Sample records for technical action plan

  1. The Climate Change Action Plan: Technical supplement

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Technical Annex documents the assumptions and parameters used in developing the supporting analysis for the Climate Change Action Plan (the Plan) issued by President Clinton on October 19, 1993. The Annex is intended to meet the needs of independent energy and environmental analysts who wish to better understand the Plan, its analytical underpinnings, and the events that need to transpire for the emissions reductions called for in the Plan to be realized. The Plan documented in this Annex reflects the outcome of a wide-ranging effort by Government agencies and interested members of the public to develop and implement actions that can reduce net greenhouse gas emissions in the year 2000 to their aggregate 1990 level. Based on agency and public input, the Climate Change Mitigation Group, chaired by the White House Office on Environmental Policy, developed the Plan`s content. Many of the actions called for in the Plan are now underway, while others are in advanced planning pending congressional action on the fiscal year 1995 budget. The analysis supporting the Plan represents the results of an interagency effort. The US Department of Energy (DOE) was responsible for the integrated analysis of energy-related options, based on the analysis of individual energy-related options by DOE, the US Environmental Protection Agency (EPA), and the US Department of Transportation (DOT). EPA led in providing analysis for actions related to methane, hydrofluorocarbons, and perfluorocarbons. The US Department of Agriculture (USDA) led the analysis of carbon sequestration actions and cooperated with EPA in the analysis of actions to reduce nitrous oxide emissions.

  2. Clarification of TMI action plan requirements. Technical report

    International Nuclear Information System (INIS)

    1980-11-01

    This document, NUREG-0737, is a letter from D.G. Eisenhut, Director of the Division of Licensing, NRR, to licensees of operating power reactors and applicants for operating licenses forwarding post-TMI requirements which have been approved for implementation. Following the accident at Three Mile Island Unit 2, the NRC staff developed the Action Plan, NUREG-0660, to provide a comprehensive and integrated plan to improve safety at power reactors. Specific items from NUREG-0660 have been approved by the Commission for implementation at reactors. In this NRC report, these specific items comprise a single document which includes additional information about schedules, applicability, method of implementation review, submittal dates, and clarification of technical positions. It should be noted that the total set of TMI-related actions have been collected in NUREG-0660, but only those items that the Commission has approved for implementation to date are included in this document, NUREG-0737

  3. The technical approach: The IAEA action plan on the safety of radiation sources

    International Nuclear Information System (INIS)

    Bilbao, A.; Wrixon, A.; Ortiz-Lopez, P.

    2001-01-01

    As part of the measures to strengthen international co-operation in nuclear, radiation and waste safety, the report refers to the implementation of the Action Plan for the Safety of Radiation Sources and the Security of Radioactive Materials. Starting with background information, the report references the main results of the Dijon Conference and of General Conference resolution GC(42)/RES/12 in September 1998, describing the actions taken by the Secretariat pursuant such resolution and also by the Board of Governors, in its sessions of March and September 1999, as well as by the General Conference, in October 1999 when by resolution GC(43)/RES/10 the Action Plan was endorsed and the Secretariat was urged to implement it. Finally, the report provides information on the status of implementation of the seven areas covered by the Action Plan and on the suggested further actions to be carried out for its implementation taking into account the decisions of the Board in its meeting of 11 September 2000 and the resolutions GC(44)/RES/11, GC(44)/RES/13 and GC(44)/RES/16 of the forty-fourth regular session of the General Conference. (author)

  4. Flood action plans

    International Nuclear Information System (INIS)

    Slopek, R.J.

    1995-01-01

    Safe operating procedures developed by TransAlta Utilities for dealing with flooding, resulting from upstream dam failures or extreme rainfalls, were presented. Several operating curves developed by Monenco AGRA were described, among them the No Overtopping Curve (NOC), the Safe Filling Curve (SFC), the No Spill Curve (NSC) and the Guaranteed Fill Curve (GFC). The concept of an operational comfort zone was developed and defined. A flood action plan for all operating staff was created as a guide in case of a flooding incident. Staging of a flood action plan workshop was described. Dam break scenarios pertinent to the Bow River were developed for subsequent incorporation into a Flood Action Plan Manual. Evaluation of the technical presentations made during workshops were found them to have been effective in providing operating staff with a better understanding of the procedures that they would perform in an emergency. 8 figs

  5. Corrective Action Investigation Plan for Corrective Action Unit 516: Septic Systems and Discharge Points, Nevada Test Site, Nevada, Rev. 0, Including Record of Technical Change No. 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-04-28

    This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Sites Office's (NNSA/NSO's) approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 516, Septic Systems and Discharge Points, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. CAU 516 consists of six Corrective Action Sites: 03-59-01, Building 3C-36 Septic System; 03-59-02, Building 3C-45 Septic System; 06-51-01, Sump Piping, 06-51-02, Clay Pipe and Debris; 06-51-03, Clean Out Box and Piping; and 22-19-04, Vehicle Decontamination Area. Located in Areas 3, 6, and 22 of the NTS, CAU 516 is being investigated because disposed waste may be present without appropriate controls, and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. Existing information and process knowledge on the expected nature and extent of contamination of CAU 516 are insufficient to select preferred corrective action alternatives; therefore, additional information will be obtained by conducting a corrective action investigation. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3/2004.

  6. Technical Assistance Plan (TAP)

    Science.gov (United States)

    A Technical Assistance Plan (TAP) enables community groups to retain the services of an independent technical advisor and to provide resources for a community group to help inform other community members about site decisions.

  7. DTIC (Defense Technical Information Center) Model Action Plan for Incorporating DGIS (DOD Gateway Information System) Capabilities.

    Science.gov (United States)

    1986-05-01

    of technical information for DoD," and its sub-goals to "Develop interorganizational database links," to "Use new technologies to expand the media in...technological applications, business procedures, and regulatory matters- IDIALOG Database Catalog) b SoFt’ :XCIENCES Socia & S’I.SEARtCH: This database is a

  8. PTTSA Action Plan Report

    International Nuclear Information System (INIS)

    1991-02-01

    The Pre-Tiger Team Self-Assessment (PTTSA) Report identified findings with respect to the way Sandia National Laboratories (SNL), Albuquerque, (including Tonopah Test Range (TTR) and Kauai Test Facility (KTF)) conducts its environment, safety, and health (ES ampersand H) activities. It presented Action Plan Requirements (APR) addressing these findings. The purpose of this PTTSA Action Plan Report is to assist in managing these action plan requirements by collecting, prioritizing, and estimating required resources. The specific objectives addressed by this report include: collection of requirements for the resolution of the findings presented in the PTTSA Report; consolidation of proposed Action Plan Requirements into logical Action Plan groupings for efficiency of resolution; categorization of Action Plans according to severity of the hazards represented by the findings; provision of a basis for long-range planning and issues management; documentation of the status of the proposed corrective actions; establishment of traceability of the corrective action to the original problem or issue; and integration of these plans into the existing ES ampersand H structure. The Action Plans in this report are an intermediate step between the identification of a problem or a finding in the PTTSA Report and the execution of the solution. They consist of requirements for solution, proposed actions, and an estimate of the time and (where applicable) resources required to develop the solution. This report is an input to the process of planning, resource commitment, development, testing, implementation, and maintenance of problem resolution. 2 figs

  9. Drinking Water Action Plan

    Science.gov (United States)

    EPA's Drinking Water Action Plan serves as a national call to action, urging all levels of government, utilities, community organizations, and other stakeholders to work together to increase the safety and reliability of drinking water.

  10. Benzidine Dyes Action Plan

    Science.gov (United States)

    This Action Plan addresses the use of benzidine-based dyes and benzidine congener-based dyes, both metalized and non-metalized, in products that would result in consumer exposure, such as for use to color textiles.

  11. Asthma action plan

    OpenAIRE

    Public Health Agency

    2014-01-01

    This action plans allow each child (or parent/carer) to record his or her asthma treatment to help manage their asthma when they are well, when their symptoms get worse and when they are suffering an asthma attack.

  12. Bicycle Safety Action Plan

    Science.gov (United States)

    2012-09-01

    The Arizona Department of Transportation (ADOT) Bicycle Safety Action Plan (BSAP) : identifies improvements, programs, and strategies that, upon their implementation, will : reduce the frequency of bicyclist fatalities and injury crashes that occur o...

  13. Corrective Action Investigation Plan for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada (December 2002, Revision No.: 0), Including Record of Technical Change No. 1

    Energy Technology Data Exchange (ETDEWEB)

    NNSA/NSO

    2002-12-12

    The Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 204 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 204 is located on the Nevada Test Site approximately 65 miles northwest of Las Vegas, Nevada. This CAU is comprised of six Corrective Action Sites (CASs) which include: 01-34-01, Underground Instrument House Bunker; 02-34-01, Instrument Bunker; 03-34-01, Underground Bunker; 05-18-02, Chemical Explosives Storage; 05-33-01, Kay Blockhouse; 05-99-02, Explosive Storage Bunker. Based on site history, process knowledge, and previous field efforts, contaminants of potential concern for Corrective Action Unit 204 collectively include radionuclides, beryllium, high explosives, lead, polychlorinated biphenyls, total petroleum hydrocarbons, silver, warfarin, and zinc phosphide. The primary question for the investigation is: ''Are existing data sufficient to evaluate appropriate corrective actions?'' To address this question, resolution of two decision statements is required. Decision I is to ''Define the nature of contamination'' by identifying any contamination above preliminary action levels (PALs); Decision II is to ''Determine the extent of contamination identified above PALs. If PALs are not exceeded, the investigation is completed. If PALs are exceeded, then Decision II must be resolved. In addition, data will be obtained to support waste management decisions. Field activities will include radiological land area surveys, geophysical surveys to identify any subsurface metallic and nonmetallic debris, field screening for applicable contaminants of potential concern, collection and analysis of surface and subsurface soil samples from biased locations

  14. RPII Action Plan

    International Nuclear Information System (INIS)

    2011-03-01

    This document outlines RPII's committments under the Public Service Action Plan 2010 to 2014, otherwise known as the Croke Park Agreement. The document describes the proposed changes to the workplan, the benefits arising from the changes and the timeframe for implementing the committments

  15. The 1986 action plan

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Discussion covers the actions that must be taken and the standards to be met to achieve the goals of the 20 year plan. Bonneville Power Administration (BPA) has agreed to develop detailed work plans for achieving the objects of the plan, through a public process in consultation with the Council and interested parties. BPA work plans and activities are outlined. The Council's plan emphasizes the following priorities: (1) a stronger regional role for BPA; (2) development of the capability to acquire conservation on a regional basis; (3) strategies to make better use of the hydropower system; (4) building conservation capability in all sectors; (5) demonstrating the cost effectiveness of renewable resources so they are available before the region has to build new generating resources; (6) allocation of costs for two unfinished nuclear power plants and elimination of barriers to their completion; and (7) a study of electric power sales and purchases between regions

  16. Corrective Action Investigation Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada (with Record of Technical Change No.1)

    International Nuclear Information System (INIS)

    2000-01-01

    This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 490 under the Federal Facility Agreement and Consent Order. Corrective Active Unit 490 consists of four Corrective Action Sites (CASs): 03-56-001-03BA, Fire Training Area (FTA); RG-56-001-RGBA, Station 44 Burn Area; 03-58-001-03FN, Sandia Service Yard; and 09-54-001-09L2, Gun Propellant Burn Area. These CASs are located at the Tonopah Test Range near Areas 3 and 9. Historically, the FTA was used for training exercises where tires and wood were ignited with diesel fuel. Records indicate that water and carbon dioxide were the only extinguishing agents used during these training exercises. The Station 44 Burn Area was used for fire training exercises and consisted of two wooden structures. The two burn areas (ignition of tires, wood, and wooden structures with diesel fuel and water) were limited to the building footprints (10 ft by 10 ft each). The Sandia Service Yard was used for storage (i.e., wood, tires, metal, electronic and office equipment, construction debris, and drums of oil/grease) from approximately 1979 to 1993. The Gun Propellant Burn Area was used from the 1960s to 1980s to burn excess artillery gun propellant, solid-fuel rocket motors, black powder, and deteriorated explosives; additionally, the area was used for the disposal of experimental explosive items. Based on site history, the focus of the field investigation activities will be to: (1) determine the presence of contaminants of potential concern (COPCs) at each CAS, (2) determine if any COPCs exceed field-screening levels and/or preliminary action levels, and (3) determine the nature and extent of contamination with enough certainty to support selection of corrective action alternatives for each CAS. The scope of this CAIP is to resolve the

  17. Corrective Action Investigation Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada (with Record of Technical Change No.1)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Nevada Operations Office

    2000-06-09

    This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 490 under the Federal Facility Agreement and Consent Order. Corrective Active Unit 490 consists of four Corrective Action Sites (CASs): 03-56-001-03BA, Fire Training Area (FTA); RG-56-001-RGBA, Station 44 Burn Area; 03-58-001-03FN, Sandia Service Yard; and 09-54-001-09L2, Gun Propellant Burn Area. These CASs are located at the Tonopah Test Range near Areas 3 and 9. Historically, the FTA was used for training exercises where tires and wood were ignited with diesel fuel. Records indicate that water and carbon dioxide were the only extinguishing agents used during these training exercises. The Station 44 Burn Area was used for fire training exercises and consisted of two wooden structures. The two burn areas (ignition of tires, wood, and wooden structures with diesel fuel and water) were limited to the building footprints (10 ft by 10 ft each). The Sandia Service Yard was used for storage (i.e., wood, tires, metal, electronic and office equipment, construction debris, and drums of oil/grease) from approximately 1979 to 1993. The Gun Propellant Burn Area was used from the 1960s to 1980s to burn excess artillery gun propellant, solid-fuel rocket motors, black powder, and deteriorated explosives; additionally, the area was used for the disposal of experimental explosive items. Based on site history, the focus of the field investigation activities will be to: (1) determine the presence of contaminants of potential concern (COPCs) at each CAS, (2) determine if any COPCs exceed field-screening levels and/or preliminary action levels, and (3) determine the nature and extent of contamination with enough certainty to support selection of corrective action alternatives for each CAS. The scope of this CAIP is to resolve

  18. Technical planning activity: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  19. Technical planning activity: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements

  20. Mitigation Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  1. Guam Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  2. Engineering Technical Review Planning Briefing

    Science.gov (United States)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  3. Remedial action planning for Trench 1

    International Nuclear Information System (INIS)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.; Castaneda, N.

    1998-01-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site

  4. INDOT Technical Training Plan : [Technical Summary

    Science.gov (United States)

    2012-01-01

    A wide range of job classifications, increasing technical : performance expectations, licensing and certification requirements, : budget restrictions and frequent department : reorganization has made technical training of employees : more difficult, ...

  5. Fukushima action plan 2014

    International Nuclear Information System (INIS)

    2014-02-01

    analyses of the EU stress tests new points were added. The list of the identified points is continually verified on the basis of newest findings and updated if necessary. In 2014 it was decided to definitively shut down the KKM reactor in 2019. The decision to withdraw the long term operation of KKM influences the application of the improvements planned and imposed as a consequence of Fukushima.The Fukushima action plans are an instrument for the evaluation of new findings from the Fukushima accident and for planning improvements. The advancement of the treatment of the identified points is documented and published

  6. Technical assistance contractor Management Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins ampersand Beckwith Agra, Inc. (SHB Agra), and Geraghty ampersand Miller, Inc. (G ampersand M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC's groundwater technical breadth and depth, so G ampersand M was brought in to augment the team's capabilities. The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC's management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls

  7. 'Action 2016': AREVA's strategic action plan

    International Nuclear Information System (INIS)

    Marie, Patricia; Briand, Pauline; Floquet-Daubigeon, Fleur; Michaut, Maxime; De Scorbiac, Marie; Du Repaire, Philippine

    2011-01-01

    On December 13, 2011, Luc Oursel, CEO, and Pierre Aubouin, Chief Financial Officer presented the group's strategic plan for the period 2012-2016. The plan has been drawn up collectively and is based on a thorough-going analysis and a realistic assessment of perspectives for all group activities and associated resources. Development of nuclear and renewable energies: the fundamentals are unchanged. In this context, the German decision remains an isolated case and the great majority of nuclear programs around the world have been confirmed. More conservative in its projections than the International Energy Agency, the group expects growth of 2.2% annually, reaching 583 GW of installed nuclear capacity by 2030, against 378 GW today. However, the Fukushima accident will lead to delays in launching new programs. 'Action 2016' plan aims to consolidate AREVA's leadership in nuclear energy and become a leading player in renewable energy. The group's strategic action plan 'Action 2016' is based on the following strategic choices: - commercial priority given to value creation, - selectivity in investments, - strengthening of the financial structure. These demand an improvement in the group's performance by 2015. This plan makes nuclear safety a strategic priority for the industrial and commercial performance of the group. This ambitious performance plan for the period 2012-2016 will give the group the wherewithal to withstand a temporary slowdown in the market resulting from the Fukushima accident and to deliver safe and sustainable growth of the business. The plan sets out the strategic direction for the group's employees for the years ahead: taking advantage of the expected growth in nuclear and renewable energies, targeted investment programs, and return to self-financing as of 2014

  8. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  9. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  10. Translating Technical Support Into Country Action: The Role of the Interagency Task Team on the Prevention and Treatment of HIV Infection in Pregnant Women, Mothers, and Children in the Global Plan Era.

    Science.gov (United States)

    Luo, Chewe; Hirnschall, Gottfried; Rodrigues, Jessica; Romano, Sostena; Essajee, Shaffiq; Rogers, Braeden; McCarthy, Elizabeth; Mwango, Albert; Sangrujee, Nalinee; Adler, Michelle R; Houston, James C; Langa, Judite O; Urso, Marilena; Bolu, Omotayo; Tene, Gilbert; Elat Nfetam, Jean B; Kembou, Etienne; Phelps, Benjamin R

    2017-05-01

    While the Interagency Task Team on the Prevention and Treatment of HIV Infection in Pregnant Women, Mothers, and Children (IATT) partnership existed before the Global Plan Towards the Elimination of New HIV Infections Among Children by 2015 and Keeping Their Mothers Alive (Global Plan), its reconfiguration was critical to coordinating provision of technical assistance that positively influenced country decision-making and program performance. This article describes how the Global Plan anchored the work of the IATT and, in turn, how the IATT's technical assistance helped to accelerate achievement of the Global Plan targets and milestones. The technical assistance that will be discussed addressed a broad range of priority actions and milestones described in the Global Plan: (1) planning for and implementing Option B+; (2) strengthening monitoring and evaluation systems; (3) translating evidence into action and advocacy; and (4) promoting community engagement. This article also reviews the ongoing challenges and opportunities of providing technical assistance in a rapidly evolving environment that calls for ever more flexible and contextualized responses. The effectiveness of technical assistance facilitated by the IATT was defined by its timeliness, evidence base, and unique global perspective that built on the competencies of its partners and promoted synergies across program areas. Reaching the final goal of eliminating vertical transmission of HIV infection and achieving an AIDS-free generation in countries with the highest HIV burden requires that the IATT partnership and technical assistance remain responsive to country-specific needs while aligning with the current programmatic reality and new global goals such as the Sustainable Development Goals and 90-90-90 targets.

  11. American Samoa: Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ness, J. Erik [National Renewable Energy Lab. (NREL), Golden, CO (United States); Haase, Scott [National Renewable Energy Lab. (NREL), Golden, CO (United States); Conrad, Misty [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    This document outlines actions being taken to reduce American Samoa's petroleum consumption. It describes the four near-term strategies selected by the American Samoa Renewable Energy Committee during action-planning workshops conducted in May 2016, and describes the steps that will need to be taken to implement those strategies.

  12. Planning an action.

    Science.gov (United States)

    Gentilucci, M; Negrotti, A; Gangitano, M

    1997-06-01

    The motor control of a sequence of two motor acts forming an action was studied in the present experiment. The two analysed motor acts were reaching-grasping an object (first target) and placing it on a second target of the same shape and size (experiment 1). The aim was to determine whether extrinsic properties of the second target (i.e. target distance) could selectively influence the kinematics of reaching and grasping. Distance, position and size of both targets were randomly varied across the experimental session. The kinematics of the initial phase of the first motor act, that is, velocity of reaching and hand shaping of grasping, were influenced by distance of the second target. No kinematic difference was found between movements executed with and without visual control of both hand and targets. These results could be due to computation of the general program of an action that takes into account extrinsic properties of the final target. Conversely, they could depend on a visual interference effect produced by the near second target on the control of the first motor act. In order to dissociate the effects due to second target distance from those due to visual interference, two control experiments were carried out. In the first control experiment (experiment 2) subjects executed movements directed towards spatial locations at different distances from the first target, as in experiment 1. However, the near second target was not presented and subjects were required to place the object on an arbitrary near position. Distance of the second (either real or arbitrary) target affected the reaching component of the first motor act, as in experiment 1, but not the grasp component. In the second control experiment (experiment 3), the pure visual interference effect was tested. Subjects were required to reach and grasp the object and to lift it in either presence or absence of a second near stimulus. No effect on the initial phase of the first motor act was observed. The

  13. Succession planning for technical experts

    Energy Technology Data Exchange (ETDEWEB)

    Kirk, Bernadette Lugue [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Cain, Ronald A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Dewji, Shaheen A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Agreda, Carla L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-07-01

    This report describes a methodology for identifying, evaluating, and mitigating the loss of key technical skills at nuclear operations facilities. The methodology can be adapted for application within regulatory authorities and research and development organizations, and can be directly applied by international engagement partners of the Department of Energy’s National Nuclear Security Administration (NNSA). The resultant product will be of direct benefit to two types of NNSA missions: (1) domestic human capital development programs tasked to provide focused technical expertise to succeed an aging nuclear operations workforce, and (2) international safeguards programs charged with maintaining operational safeguards for developing/existing nuclear power program in nations where minimal available resources must be used effectively. This report considers succession planning and the critical skills necessary to meet an institution’s goals and mission. Closely tied to succession planning are knowledge management and mentorship. In considering succession planning, critical skill sets are identified and are greatly dependent on the subject matter expert in question. This report also provides examples of critical skills that are job specific.

  14. Succession planning for technical experts

    International Nuclear Information System (INIS)

    Kirk, Bernadette Lugue; Cain, Ronald A.; Dewji, Shaheen A.; Agreda, Carla L.

    2017-01-01

    This report describes a methodology for identifying, evaluating, and mitigating the loss of key technical skills at nuclear operations facilities. The methodology can be adapted for application within regulatory authorities and research and development organizations, and can be directly applied by international engagement partners of the Department of Energy’s National Nuclear Security Administration (NNSA). The resultant product will be of direct benefit to two types of NNSA missions: (1) domestic human capital development programs tasked to provide focused technical expertise to succeed an aging nuclear operations workforce, and (2) international safeguards programs charged with maintaining operational safeguards for developing/existing nuclear power program in nations where minimal available resources must be used effectively. This report considers succession planning and the critical skills necessary to meet an institution’s goals and mission. Closely tied to succession planning are knowledge management and mentorship. In considering succession planning, critical skill sets are identified and are greatly dependent on the subject matter expert in question. This report also provides examples of critical skills that are job specific.

  15. Judicial action and technical risk

    International Nuclear Information System (INIS)

    Buiren, S. van; Ballerstedt, E.; Grimm, D.

    1981-05-01

    In this study it is examined how the judiciary deals with those sections that are crucial for the use of nuclear energy. The authors get down to the pre-dominant problem of the law relating to technical safety. In the process they encounter the central dilemma of modern democracy, i.e. the strained relations which exist between judicial control and democratic responsibility. Since nuclear energy entered the market place, it has been the administrative courts which - in practice - have decided whether and to what extent nuclear energy may be used. On the one hand, this is a result of the fast growth of, and rapid change in, science and technology. On the other hand, it is a result of administrative law standards which have developed in the Federal Republic of Germany after World War II. The former requires the normative structure of the atomic law, the latter postulates how to deal with it. Legal protection against an act of public authority is guaranteed by the Basic Law and usually with some justification considered a splendid achievement of our state which is based on the rule of law. It has lead to developments in the atomic law and in many parts of the law relating to technical safety on which opinions are divided. In a dogmatic manner it has been legally examined to what extent an extensive review competence of the judiciary is a must, and whether there are any possibilities of judicial control of acts of public authorities without having to interfere with the original competence of administrations. (orig./HP) [de

  16. American Samoa Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Haase, Scott [National Renewable Energy Lab. (NREL), Golden, CO (United States); Esterly, Sean [National Renewable Energy Lab. (NREL), Golden, CO (United States); Herdrich, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bodell, Tim [National Renewable Energy Lab. (NREL), Golden, CO (United States); Visser, Charles [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  17. Technical Project Planning (TPP) Process. Engineer Manual

    National Research Council Canada - National Science Library

    1998-01-01

    This Engineer Manual (EM) describes the Technical Project Planning (TPP) process for identifying project objectives and designing data collection programs at hazardous, toxic, and radioactive waste sites...

  18. INDOT Technical Training Plan : Appendix J

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  19. INDOT Technical Training Plan : Appendix H

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  20. INDOT Technical Training Plan : Appendix G

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  1. INDOT Technical Training Plan : Appendix K

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  2. INDOT Technical Training Plan : Appendix N

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  3. INDOT Technical Training Plan : Appendix C

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  4. INDOT Technical Training Plan : Appendix B

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  5. INDOT Technical Training Plan : Appendix O

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  6. INDOT Technical Training Plan : Appendix E

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  7. Hungarian climate change action plan

    Energy Technology Data Exchange (ETDEWEB)

    Molnar, S.; Takacs, T. [Systemexpert Consulting Ltd., Budapest (Hungary); Arpasi, M. [MOL, Budapest (Hungary); Farago, T.; Palvoelgyi, T. [Ministry for Environment and Regional Policy, Budapest (Hungary); Harnos, Z. [Univ. of Horticulture, Budapest (Hungary); Lontay, Z. [EGI-Contracting Engineering Co. Ltd., Budapest (Hungary); Somogyi, Z. [Forest Research Inst., Budapest (Hungary); Tajthy, T. [Univ. of Technology, Budapest (Hungary)

    1998-12-31

    In 1994--1996, within the framework of the US Country Studies Program, the Hungarian Country Study Team developed the national greenhouse gas emission inventory, and elaborated the mitigation options for the different sectors of the economy. In 1997, the development of a National Action Plan was begun as the continuation of this work. Results of the inventory study showed that greenhouse gas emissions decreased from the selected base level (i.e., from the yearly average emissions of 1985--1987) until 1994 by cca. 25%. However, this decrease was primarily caused by the deep economic recession. Therefore the policy makers have to face the problem of economic recovery without a relevant increase of greenhouse gas emissions in the near future. This is the main focus of the mitigation analysis and the National Action Plan.

  8. An action plan for radioactive substances regulation

    International Nuclear Information System (INIS)

    1998-01-01

    This document sets out an action plan for the Agency's Radioactive Substances Regulation function. Our vision is to secure continuous improvement in the protection of the public and the environment from the harmful effects of radioactive substances. Radioactive Substances Regulation will work with others to realise this vision and contribute to the Agency's role in achieving sustainable development. We will also work to ensure that the Agency achieves its objectives in an efficient, consistent and integrated way. The main elements of our Action Plan are as follows: establishing indicators of sustainability and the means and methods of monitoring them; establishing performance indicators and a programme of targets and objectives to be achieved; establishing a database of all premises subject to RSA93 and to use it for work planning, resource targeting, and improvement to radioactive waste management; provision of systems of procedures and technical guidance to ensure nationally consistent and cost- effective regulation; establishing systems to audit the implementation of the procedures and guidance; ensuring quality of regulation by defining technical competencies of inspectors and the training programmes to secure them; an R and D programme targeted on improving radioactive waste management and radioactive substances regulation; and full and effective participation in development of national policy

  9. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 357: Mud Pits and Waste Dump, Nevada Test Site, Nevada: Revision 0, Including Record of Technical Change No. 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-06-25

    This Streamlined Approach for Environmental Restoration (SAFER) plan was prepared as a characterization and closure report for Corrective Action Unit (CAU) 357, Mud Pits and Waste Dump, in accordance with the Federal Facility Agreement and Consent Order. The CAU consists of 14 Corrective Action Sites (CASs) located in Areas 1, 4, 7, 8, 10, and 25 of the Nevada Test Site (NTS). All of the CASs are found within Yucca Flat except CAS 25-15-01 (Waste Dump). Corrective Action Site 25-15-01 is found in Area 25 in Jackass Flat. Of the 14 CASs in CAU 357, 11 are mud pits, suspected mud pits, or mud processing-related sites, which are by-products of drilling activities in support of the underground nuclear weapons testing done on the NTS. Of the remaining CASs, one CAS is a waste dump, one CAS contains scattered lead bricks, and one CAS has a building associated with Project 31.2. All 14 of the CASs are inactive and abandoned. Clean closure with no further action of CAU 357 will be completed if no contaminants are detected above preliminary action levels. A closure report will be prepared and submitted to the Nevada Division of Environmental Protection for review and approval upon completion of the field activities. Record of Technical Change No. 1 is dated 3/2004.

  10. Planning a DSN support section technical library

    Science.gov (United States)

    Bailey, T.; Chatburn, C. C.

    1980-01-01

    The planning procedure being used to establish a technical library for the Deep Space Network support section is described. The inventory and survey methods employed are described and the preliminary results of these methods are discussed.

  11. Technical Specification action statements requiring shutdown

    International Nuclear Information System (INIS)

    Mankamo, T.; Kim, I.S.; Samanta, P.K.

    1993-11-01

    When safety systems fail during power operation, the limiting conditions for operation (LCOs) and associated action statements of technical specifications typically require that the plant be shut down within the limits of allowed outage time (AOT). However, when a system needed to remove decay heat, such as the residual heat removal (RHR) system, is inoperable or degraded, shutting down the plant may not necessarily be preferable, from a risk perspective, to continuing power operation over a usual repair time, giving priority to the repairs. The risk impact of the basic operational alternatives, i.e., continued operation or shutdown, was evaluated for failures in the RHR and standby service water (SSW) systems of a boiling-water reactor (BWR) nuclear power plant. A complete or partial failure of the SSW system fails or degrades not only the RHR system but other front-line safety systems supported by the SSW system. This report presents the methodology to evaluate the risk impact of LCOs and associated AOT; the results of risk evaluation from its application to the RHR and SSW systems of a BWR; the findings from the risk-sensitivity analyses to identify alternative operational policies; and the major insights and recommendations to improve the technical specifications action statements

  12. Corrective action investigation plan for Corrective Action Unit 143: Area 25 contaminated waste dumps, Nevada Test Site, Nevada, Revision 1 (with Record of Technical Change No. 1 and 2)

    Energy Technology Data Exchange (ETDEWEB)

    USDOE Nevada Operations Office (DOE/NV)

    1999-06-28

    This plan contains the US Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate correction action alternatives appropriate for the closure of Corrective Action Unit (CAU) 143 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 143 consists of two waste dumps used for the disposal of solid radioactive wastes. Contaminated Waste Dump No.1 (CAS 25-23-09) was used for wastes generated at the Reactor Maintenance Assembly and Disassembly (R-MAD) Facility and Contaminated Waste Dump No.2 (CAS 25-23-03) was used for wastes generated at the Engine Maintenance Assembly and Disassembly (E-MAD) Facility. Both the R-MAD and E-MAD facilities are located in Area 25 of the Nevada Test Site. Based on site history, radionuclides are the primary constituent of concern and are located in these disposal areas; vertical and lateral migration of the radionuclides is unlikely; and if migration has occurred it will be limited to the soil beneath the Contaminated Waste Disposal Dumps. The proposed investigation will involve a combination of Cone Penetrometer Testing within and near the solid waste disposal dumps, field analysis for radionuclides and volatile organic compounds, as well as sample collection from the waste dumps and surrounding areas for off-site chemical, radiological, and geotechnical analyses. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  13. Corrective Action Investigation Plan for Corrective Action Unit 214: Bunkers and Storage Areas Nevada Test Site, Nevada: Revision 0, Including Record of Technical Change No. 1 and No. 2

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-05-16

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 214 under the Federal Facility Agreement and Consent Order. Located in Areas 5, 11, and 25 of the Nevada Test Site, CAU 214 consists of nine Corrective Action Sites (CASs): 05-99-01, Fallout Shelters; 11-22-03, Drum; 25-99-12, Fly Ash Storage; 25-23-01, Contaminated Materials; 25-23-19, Radioactive Material Storage; 25-99-18, Storage Area; 25-34-03, Motor Dr/Gr Assembly (Bunker); 25-34-04, Motor Dr/Gr Assembly (Bunker); and 25-34-05, Motor Dr/Gr Assembly (Bunker). These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). The suspected contaminants and critical analyte s for CAU 214 include oil (total petroleum hydrocarbons-diesel-range organics [TPH-DRO], polychlorinated biphenyls [PCBs]), pesticides (chlordane, heptachlor, 4,4-DDT), barium, cadmium, chronium, lubricants (TPH-DRO, TPH-gasoline-range organics [GRO]), and fly ash (arsenic). The land-use zones where CAU 214 CASs are located dictate that future land uses will be limited to nonresidential (i.e., industrial) activities. The results of this field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the corrective action decision document.

  14. Corrective Action Investigation Plan for Corrective Action Unit 527: Horn Silver Mine, Nevada Test Site, Nevada: Revision 1 (Including Records of Technical Change No.1, 2, 3, and 4)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office

    2002-12-06

    This Corrective Action Investigation Plan contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 527, Horn Silver Mine, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 527 consists of one Corrective Action Site (CAS): 26-20-01, Contaminated Waste Dump No.1. The site is located in an abandoned mine site in Area 26 (which is the most arid part of the NTS) approximately 65 miles northwest of Las Vegas. Historical documents may refer to this site as CAU 168, CWD-1, the Wingfield mine (or shaft), and the Wahmonie mine (or shaft). Historical documentation indicates that between 1959 and the 1970s, nonliquid classified material and unclassified waste was placed in the Horn Silver Mine's shaft. Some of the waste is known to be radioactive. Documentation indicates that the waste is present from 150 feet to the bottom of the mine (500 ft below ground surface). This CAU is being investigated because hazardous constituents migrating from materials and/or wastes disposed of in the Horn Silver Mine may pose a threat to human health and the environment as well as to assess the potential impacts associated with any potential releases from the waste. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  15. ACT Plan: Technical Manual. 2013/2014

    Science.gov (United States)

    ACT, Inc., 2013

    2013-01-01

    This manual contains information about the American College Test (ACT) Plan® program. The principal focus of this manual is to document the Plan program's technical adequacy in light of its intended purposes. This manual supersedes the 2011 edition. The content of this manual responds to requirements of the testing industry as established in the…

  16. ECOWindS Joint Action Plan

    DEFF Research Database (Denmark)

    2014-01-01

    The Joint Action Plan (JAP) is a deliverable of the ECOWindS project Work Package 4 (WP4) “Joint Action Plan”. It presents a plan of action or a roadmap for research, development, and innovation (RDI) for the Offshore Wind Service (OWS) industry. The objective of the JAP is to be an international...

  17. Ten-year urban forestry action plan

    Science.gov (United States)

    J.W." Jerry" Van Sambeek

    2017-01-01

    The Ten-year Urban Forestry Action Plan: 2016-2026 was published in September, 2015 (see http://www.urbanforestry.subr.edu/FinalActionPlan_Complete_11_17_15.pdf). This 260 page heavily illustrated document was prepared by the National Urban and Community Forestry Advisory Council (NUCFAC) under leadership and funding from the USDA Forest Service. The Plan's...

  18. SADC establishes a regional action plan.

    Science.gov (United States)

    Klouda, T

    1997-02-01

    The regional meeting held on AIDS strategy in Lilongwe, Malawi, in December, 1996, made important advances. The 12 countries of the SADC (Southern Africa Development Community) joined the European Union to institute a regional action plan for the reduction of susceptibility of people to HIV because of social, cultural, and environmental factors; the vulnerability of people with HIV infection to social and other difficulties; and the vulnerability of institutions because of the foregoing impacts. At the conference the issues explored were employment, mining, medical drugs, education, and tourism. An employment charter was seen as crucial for the success of AIDS and workplace activities. Facilitation of travel across borders was important for the reduction of susceptibility to HIV infection. Enhancement of regional policies for essential drugs was vital for drugs for the treatment of AIDS. The clarification of the regional role was critical for regional support of national action (strengthening technical and institutional capacities) and for regional joint action such as studies on research, harmonization of data collection on HIV/AIDS; organization of training; development of information and education on HIV/AIDS; facilitation of manufacturing of drugs and condoms; and the development of a regional information and education program about HIV/AIDS. The conference also clarified HIV/AIDS programs in relation to other health and socioeconomic problems.

  19. Corrective Action Investigation Plan for Corrective Action Unit 5: Landfills, Nevada Test Site, Nevada (Rev. No.: 0) includes Record of Technical Change No. 1 (dated 9/17/2002)

    Energy Technology Data Exchange (ETDEWEB)

    IT Corporation, Las Vegas, NV

    2002-05-28

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 5 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 5 consists of eight Corrective Action Sites (CASs): 05-15-01, Sanitary Landfill; 05-16-01, Landfill; 06-08-01, Landfill; 06-15-02, Sanitary Landfill; 06-15-03, Sanitary Landfill; 12-15-01, Sanitary Landfill; 20-15-01, Landfill; 23-15-03, Disposal Site. Located between Areas 5, 6, 12, 20, and 23 of the Nevada Test Site (NTS), CAU 5 consists of unlined landfills used in support of disposal operations between 1952 and 1992. Large volumes of solid waste were produced from the projects which used the CAU 5 landfills. Waste disposed in these landfills may be present without appropriate controls (i.e., use restrictions, adequate cover) and hazardous and/or radioactive constituents may be present at concentrations and locations that could potentially pose a threat to human health and/or the environment. During the 1992 to 1995 time frame, the NTS was used for various research and development projects including nuclear weapons testing. Instead of managing solid waste at one or two disposal sites, the practice on the NTS was to dispose of solid waste in the vicinity of the project. A review of historical documentation, process knowledge, personal interviews, and inferred activities associated with this CAU identified the following as potential contaminants of concern: volatile organic compounds, semivolatile organic compounds, polychlorinated biphenyls, pesticides, petroleum hydrocarbons (diesel- and gasoline-range organics), Resource Conservation and Recovery Act Metals, plus nickel and zinc. A two-phase approach has been selected to collect information and generate data to satisfy needed resolution

  20. Plan Generation and Evaluation Using Action Networks

    National Research Council Canada - National Science Library

    Peot, Mark

    2003-01-01

    ... from potential actions of the plan. Methods used to accomplish these results included the use of Action Networks, and development of a suite of analysis tools in support of the AFRL Campaign Assessment Tool...

  1. Corrective Action Investigation Plan for Corrective Action Unit 500: Test Cell A Septic System, Nevada Test Site, Nevada, Revision 0, DOE/NV--528 UPDATED WITH TECHNICAL CHANGE No.1

    Energy Technology Data Exchange (ETDEWEB)

    ITLV

    1998-12-01

    This Corrective Action Investigation Plan (CAIP) addresses one of three leachfield systems associated with Test Cell A, which is located in Area 25 at the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (see Leachfield Work Plan Figure 1-1). Corrective Action Unit 500 is comprised of the Test Cell A Septic System (CAS 25-04-05) and the associated leachfield system presented in Figure 1-1 (FFACO, 1996). The leachfield is located 60 meters (m) (200 feet [ft]) southeast of the Building 3124 gate, and approximately 45 m (150 ft) southwest of Building 3116 at Test Cell A. Test Cell A operated during the 1960s to support nuclear rocket reactor testing as part of the Nuclear Rocket Development Station (NRDS) (SNPO, 1970). Various operations within Buildings 3113B (Mechanical Equipment Room), 3115 (Helium Compressor Station), 3116 (Pump House), a water tank drain and overflow, a ''yard and equipment drain system'' outside of Building 3116, and a trailer have resulted in potentially hazardous effluent releases to the leachfield system (DOE, 1988a). The leachfield system components include discharge lines, manways, a septic tank, an outfall line, a diversion chamber, and a 15 by 30 m (50 by 100 ft) leachfield (see Leachfield Work Plan Figure 3-1 for explanation of terminology). In addition, engineering drawings show an outfall system that may or may not be connected to the CAU 500 leachfield. In general, effluent contributed to the leachfield was sanitary wastewater associated with floor drains, toilet and lavatory facilities in Building 3113B and floor drains in the remaining source buildings. The surface and subsurface soils in the vicinity of the collection system, outfall, and leachfield may have been impacted by effluent containing contaminants of potential concern (COPCs) generated by support activities associated with Test Cell A reactor testing operations.

  2. Friends Partnership Mentoring Program Action Plan

    Data.gov (United States)

    Department of the Interior — This Action Plan has been prepared to support Recommendation 11 of the U.S. Fish and Wildlife Service Refuge System’s “Conserving the Future”. The plan outlines a...

  3. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  4. Failed fuel action plan guidelines: Special report

    International Nuclear Information System (INIS)

    1987-11-01

    The objective of this document is to provide a generic guideline that can be used to formulate a failed fuel action plan (FFAP) for specific application by a utility. This document is intended to be part of a comprehensive fuel reliability monitoring, management, and improvement program. The utilities may utilize this document as one resource in developing a failed fuel action plan. This document is not intended to be used as a failed fuel action plan standard. This document is intended to provide guidance on: management responsibilities; fuel performance parameters; cost/benefit analysis; action levels; long-term improvement methods; and data collection, analysis, and trending. 3 refs., 4 figs., 6 tabs

  5. 76 FR 14402 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Science.gov (United States)

    2011-03-16

    ...-2011-0002] Draft Action Plan--A Public Health Action Plan To Combat Antimicrobial Resistance AGENCY... requesting public comment on the draft A Public Health Action Plan to Combat Antimicrobial Resistance. HHS/CDC is publishing this notice on behalf of the HHS Interagency Task Force on Antimicrobial Resistance...

  6. Task Action Plans for generic activities: Category A

    International Nuclear Information System (INIS)

    1978-10-01

    The document contains listings of generic technical activities as identified and placed in priority categories by the Office of Nuclear Reactor Regulation (NRR). In addition, it contains definitions of Priority Categories A, B, C, and D and copies of forty approved Task Action Plans for Category A activites. Problem Descriptions for the Category B, C and D tasks are contained in NUREG--0471. This material was developed within the context of NRR's Program for the Resolution of Generic Issues Related to Nuclear Power Plants. As part of this program, the assignment of identified issues to priority categories and the approval of Task Action Plans were made by NRR's Technical Activities Steering Committee, chaired by the Deputy Director, NRR. The original document was published in November 1977. In December 1977 it was updated to add the Task Action Plan for Task No. A-17, Systems Interactions in Nuclear Power Plants. This update adds Task Action Plans for Tasks A-13, A-18, A-21, A-22, A-32, A-37, A-38 and A-40. Task A-41 has been included in Task A-40. In addition, as part of this update, the following changes were made to each Task Action Plan (with the exception of the Task Action Plan for Task A-9): (1) a title page was added that includes information such as Lead NRR Organization, Lead Supervisor, Task Manager, Applicability, and Projected Completion Date; (2) detailed schedule information was deleted; and (3) a new Section 3 entitled Basis for Continued Plant Operation and Licensing Pending Completion of Task was added. These changes represent general reformatting and the addition or deletion of certain general types of information. Some substantive revisions were made to several of the plans, however, a general revision of all of the plans was not undertaken at this time

  7. Permanency Action through Concurrent Planning.

    Science.gov (United States)

    Katz, Linda

    1996-01-01

    Highlights a failure on the part of social services to respond to the current needs of the child welfare system. Strongly advocates a commitment to concurrent planning, defined here as the process of working toward family reunification while at the same time establishing an alternative plan, usually in the form of permanency with a relative or…

  8. 'Action 2016': AREVA's strategic action plan to improve performance

    International Nuclear Information System (INIS)

    Marie, Patricia; Floquet-Daubigeon, Fleur; Michaut, Maxime; De Scorbiac, Marie; Du Repaire, Philippine

    2011-01-01

    On December 12, 2011, Luc Oursel, Executive Officer of AREVA, and Pierre Aubouin, Chief Financial Executive Officer, presented the group's 'Action 2016' strategic action plan based on an in-depth analysis of the market's outlook. This document makes, first, a Detailed presentation of the 'Action 2016' plan and then presents the group's financial outlook: - Full-year 2011 immediate accounting consequences of the new market environment: operating losses expected in 2011; - 2012-2013 transition period Objective: self-finance capex in cumulative terms; - 2014-2016: safe growth and cash generation, free operating cash flow at break-even beginning in 2013, above euro 1 bn per year beginning in 2015

  9. Voluntary challenge: Ultramar Ltd. action plan

    International Nuclear Information System (INIS)

    1998-11-01

    The Action Plan described refers to the Saint-Romuald refinery. The Plan concentrates on energy efficiency improvement, and because energy consumption is a large part of total refinery operating costs economical and environmental aspects are compatible with the program concentrating on energy efficiency improvement. The plan covers: scope, action plan focus, targets and results, actions and measures, conclusion, and reporting and assessment. Ultramar's Action Plan for energy efficiency improvement concentrates on: personnel sensitization to the importance of energy efficiency, maintenance and operational improvements, and capital investment programs. The combination of maintenance/operation improvements and capital investments will allow the company refinery to improve its energy efficiency, as measured by the Internationally Recognized Solomon Index by 5% over the 1995 to 2000 time frame. In addition to that energy efficiency improvement, flare carbon dioxide emissions will be reduced to 15,000 T/year in the year 2000

  10. Technical assistance contractor Management Plan. Final [report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  11. Using action planning to promote exercise behavior.

    Science.gov (United States)

    Conner, Mark; Sandberg, Tracy; Norman, Paul

    2010-08-01

    Action planning promotes exercise behavior and mediates intention-behavior relationships. The aim of this study is to provide correlational and experimental tests of action planning as mediator of intention-exercise behavior relationships controlling for Theory of Planned Behavior variables and past behavior. In study 1 (N = 777), young adults completed questionnaires assessing Theory of Planned Behavior variables, past behavior, and planning in relation to exercise and 2 weeks later reported exercise behavior. In study 2 (N = 356), young adults were randomly allocated to complete one of two questionnaires and 2 weeks later reported exercise behavior. Both questionnaires contained similar measures to study 1 (Theory of Planned Behavior variables, past behavior in relation to exercise), but one also contained an exercise planning measure. Planning partially mediated intention-behavior relationships and intentions showed a moderated mediation effect: stronger intention-planning-behavior relationships when intentions were strong (study 1). Exercise behavior was higher in planning compared to no planning group, and this difference was greater when intentions were strong (study 2). Action planning mediates intention-exercise behavior relationships, particularly when exercise intentions are strong. Interventions promoting exercise behavior should jointly target intentions and planning.

  12. ATF Neutron Irradiation Program Technical Plan

    Energy Technology Data Exchange (ETDEWEB)

    Geringer, J. W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Katoh, Yutai [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division

    2016-03-01

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization of irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.

  13. Environmental health action plan for Europe

    International Nuclear Information System (INIS)

    1994-06-01

    This Environmental Health Action Plan for Europe was endorsed by the second European Conference on Environment and Health, held in Helsinki, 20 to 22 June 1994. It sets out directions for the attainment of long term environment and health policy objectives define in the European Charter on Environment and Health. The Action Plan is primarily addressed at the public health and environmental protection sectors. 10 refs, 4 figs, 2 tabs

  14. Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2009-07-01

    EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.

  15. 76 FR 21907 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance

    Science.gov (United States)

    2011-04-19

    ...-2011-0002] Draft Action Plan--A Public Health Action Plan To Combat Antimicrobial Resistance AGENCY... Antimicrobial Resistance (76 FR 14402). Written and electronic comments were to be received on or before April... Infectious Diseases, Division of Healthcare Quality Promotion, Office of Antimicrobial Resistance, Attn...

  16. ICDF Complex Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  17. Final Action Plan to Tiger Team

    International Nuclear Information System (INIS)

    1992-01-01

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit

  18. Mitigation action plan for 300-FF-1 remedial action

    International Nuclear Information System (INIS)

    Weiss, S.G.

    1996-10-01

    A record of decision was issued (dated July 1996), for remediation of waste sites in the 300-FF-1 Operable Unit in the 300 Area of the Hanford Site. The selected remedies for the 300-FF-1 and 300-FF-5 waste sites include selective excavation and disposal of contaminated soil and debris from the process waste units, excavation and removal of the 618-4 Burial Ground, and institutional controls for groundwater. This mitigation action plan explains how cultural resources will be managed and how revegetation for these remedial activities will be planned

  19. Driving change : sustainable development action plans Guidance

    OpenAIRE

    Sustainable Development Commission

    2008-01-01

    This guidance builds upon the Sustainable Development Commission’s previous guidance, Getting Started (August 2005), which set out the basic elements that the Sustainable Development Commission would expect to see in a good Sustainable Development Action Plan. Publisher PDF Original published August 2005.

  20. The ANSTO waste management action plan

    International Nuclear Information System (INIS)

    Levins, D.

    1997-01-01

    ANSTO's Waste Management Action Plan is a five-year program which addresses legacy issues that have arisen from the accumulation of radioactive wastes at Lucas Heights over the last forty years. Following an extensive review of waste management practices, a detailed Action Plan was prepared involving seventeen projects in the areas of solid wastes, liquid wastes, control of effluents and emissions, spent reactor fuel and organisational issues. The first year of the Waste Management Action Plan has resulted in significant achievements, especially in the areas of improved storage of solid wastes, stabilisation of uranium scrap, commissioning and operation of a scanning system for low-level waste drums, treatment of intermediate-level liquid wastes and improvements in the methods for monitoring of spent fuel storage facilities. The main goal of the Waste Management Action Plan is to achieve consistency, by the year 2000, with best practice as identified in the Radioactive Waste Safety Standards and Guidelines currently under development by the IAEA

  1. Action Plan for Florida's Public Libraries. Addendum.

    Science.gov (United States)

    Florida Library Study Commission, Tallahassee.

    The introduction to this addendum (the Action Plan is LI 004 521) discusses the present use by libraries of information-handling technology and identifies some of the trends taking place in performing essential library services. While some limited inroads have been made in automating certain public library functions, the bulk of services is still…

  2. Chemical Safety for Sustainability: Research Action Plan

    Science.gov (United States)

    The Strategic Research Action Plan for EPA’s Chemical Safety for Sustainability research program presents the purpose, design and themes of the Agency’s research efforts to ensure safety in the design, manufacture and use of existing and future chemicals.

  3. 36 CFR 72.13 - Action plan.

    Science.gov (United States)

    2010-07-01

    ... objectives, priorities and implementation strategies in relation to the intent of the Urban Park and... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Action plan. 72.13 Section 72.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK...

  4. Emergency Action Plans in Physical Education

    Science.gov (United States)

    Tanis, Cindy J.; Hebel, Susan L.

    2016-01-01

    Emergency Action Plans (EAP) are essential to properly manage injuries and illnesses in physical education and sport. However, most literature discusses EAP's in the athletic arena instead of physical education. The purpose of this study was to examine physical education instructors' experiences of student illness and injury, discuss the steps of…

  5. Structural priming, action planning, and grammar.

    Science.gov (United States)

    MacDonald, Maryellen C; Weiss, Daniel J

    2017-01-01

    Structural priming is poorly understood and cannot inform accounts of grammar for two reasons. First, those who view performance as grammar + processing will always be able to attribute psycholinguistic data to processing rather than grammar. Second, structural priming may be simply an example of hysteresis effects in general action planning. If so, then priming offers no special insight into grammar.

  6. Innovation Program Energyweb. Plan of action

    International Nuclear Information System (INIS)

    Besteboer, S.I.; De Wolff, J.J.; Braber, K.J.

    2005-06-01

    The horticulture sector can make use of surplus heat, produced within the greenhouses, and supply the heat to several energy consuming parties (other greenhouse businesses, buildings, etc.). Thus, a local or regional web of suppliers and consumers starts. In this report a plan of action is presented [nl

  7. Housekeeping category corrective action unit work plan

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process

  8. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  9. RTNS-II technical development plan

    International Nuclear Information System (INIS)

    Davis, J.C.

    1976-01-01

    The goal of the RTNS-II (Rotating Target Neutron Source) project at the Lawrence Livermore Laboratory is to provide a dedicated facility for investigation of 14-MeV neutron damage processes in materials to be used in controlled thermonuclear fusion reactors. LLL will operate the RTNS-II facility for ERDA as a national materials damage center. This Technical Development Plan describes the need for 14-MeV neutron sources, the physics and engineering design basis for the beam-target sources to be built for the RTNS-II facility, and the research support equipment included in the facility. Fiscal and manpower schedules for construction and operation of the facility are included. Finally, the accelerator and target research program directed at raising the strength of these sources from the design goal of 4 x 10 13 n/s to higher levels is described

  10. Implementation of local climate action plans

    DEFF Research Database (Denmark)

    Damsø, Tue Noa Jacques; Kjær, Tyge; Christensen, Thomas Budde

    2017-01-01

    The purpose of this article is to improve understanding of local climate action plans and their implementation and evaluation. It explores how goal definition and the choice of assessment metrics frame goal attainment and influence implementation behaviour. Using the Danish capital of Copenhagen...... for an in-depth case study, we map activities undertaken and assess implementation performance in terms of infrastructure changes and GHG emission reductions during the period from adoption of the first climate action plan in 2002 to the present day (2017). The study shows that while Copenhagen exhibits...... to system developments that inhibit further changes beyond the initial target period. The article concludes with a list of lessons learned for other cities that are in earlier stages of climate planning. Most importantly, the study points to the need for activity-related evaluation metrics, scope...

  11. Yukon Government climate change action plan

    International Nuclear Information System (INIS)

    2009-02-01

    This Climate Change Action Plan described the measures that are being taken by the Yukon Government to adapt to, understand, and reduce contributions to climate change. The action plan is the result of input received from more than 100 individuals and organizations and provides clear direction for a strategy that will minimize the negative impacts of climate change and provide economic, social and other environmental benefits through climate change mitigation. The Yukon government has already taken many actions that respond to climate change, such as: developing the Yukon Cold Climate Innovation Centre; supporting the Northern Climate Exchange for public education and outreach; funding community recycling depots and other groups that reduce waste generation, promote public awareness and divert solid waste; and working with provincial and territorial counterparts to enhance national building standards. The main objectives of the climate change actions are to enhance knowledge and understanding of climate change; adapt to climate change; reduce greenhouse gas emissions; and lead Yukon action in response to climate change. tabs., figs.

  12. The Danish Organic Action Plan 2020

    DEFF Research Database (Denmark)

    Sørensen, Nina Nørgaard; Lassen, Anne Dahl; Løje, Hanne

    2015-01-01

    procurement measurements by two methods and to collect and discuss baseline organic food procurement measurements from public kitchens participating in the Danish Organic Action Plan 2020. Design Comparison study measuring organic food procurement by applying two different methods, one based on the use......Objective With political support from the Danish Organic Action Plan 2020, organic public procurement in Denmark is expected to increase. In order to evaluate changes in organic food procurement in Danish public kitchens, reliable methods are needed. The present study aimed to compare organic food...... of procurement invoices (the Organic Cuisine Label method) and the other on self-reported procurement (the Dogme method). Baseline organic food procurement status was based on organic food procurement measurements and background information from public kitchens. Setting Public kitchens participating in the six...

  13. Wetland Resources Action Planning (WRAP) toolkit

    DEFF Research Database (Denmark)

    Bunting, Stuart W.; Smith, Kevin G.; Lund, Søren

    2013-01-01

    The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims...... to communicate best practices in conserving biodiversity and sustaining ecosystem services to potential users and to promote the wise-use of aquatic resources, improve livelihoods and enhance policy information....

  14. National Biofuels Action Plan, October 2008

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2008-10-01

    To help industry achieve the aggressive national goals, Federal agencies will need to continue to enhance their collaboration. The Biomass Research and Development (R&D) Board was created by Congress in the Biomass Research and Development Act of 2000. The National Biofuels Action Plan outlines areas where interagency cooperation will help to evolve bio-based fuel production technologies from promising ideas to competitive solutions.

  15. Action Plan to Improve Customer Relationship Management

    OpenAIRE

    Laine, Antti

    2014-01-01

    This thesis concentrates on improving product recognisability and most critical Customer Relationship Management issues in the case company. The case company seeks to clarify the product recognizability and the customers’ knowledge of their product range in its whole diagnostic sector, and wanted to develop an action plan to improve them. To suggest improvements in these areas, this thesis investigates the current state of the product knowledge, and the customers’ opinions as for how ...

  16. BEPS Action Plan: Global Tax Cooperation

    OpenAIRE

    Andrei Shelepov

    2016-01-01

    Given the dynamics of economic and financial globalization, national tax authorities often do not have adequate tools to effectively combat tax avoidance practices that exploit gaps in the existing tax rules. To address the global problem of tax base erosion and profit shifting (BEPS), the Organisation for Economic Co-operation and Development (OECD) and the Group of 20 (G20) have consolidated their efforts on an equal footing. Their joint BEPS Action Plan allowed to involve more than 100 cou...

  17. Quality Assurance Plan, N springs expedited response action

    International Nuclear Information System (INIS)

    Jackson, G.J.

    1994-01-01

    This document is the Quality Assurance Plan (QAP) to be followed during the definitive design, construction, and operational phases for activities associated with the N Springs Expedited Response Action (ERA) for the 100-NR-2 Operable Unit (OU). Westinghouse Hanford Company (WHC) will comply with the US Department of Energy (DOE) Order 5700.6C, Quality Assurance (DOE 1989), and the US Environmental Protection Agency (EPA), EPA/530-SW-86-031, Technical Guidance Document: Construction Quality Assurance for Hazardous Waste Land Disposal Facilities (EPA 1986)

  18. India's National Action Plan on Climate Change.

    Science.gov (United States)

    Pandve, Harshal T

    2009-04-01

    Climate change is one of the most critical global challenges of our times. Recent events have emphatically demonstrated our growing vulnerability to climate change. Climate change impacts will range from affecting agriculture - further endangering food security - to sea-level rise and the accelerated erosion of coastal zones, increasing intensity of natural disasters, species extinction, and the spread of vector-borne diseases. India released its much-awaited National Action Plan on Climate Change (NAPCC) to mitigate and adapt to climate change on June 30, 2008, almost a year after it was announced. The NAPCC runs through 2017 and directs ministries to submit detailed implementation plans to the Prime Minister's Council on Climate Change by December 2008. This article briefly reviews the plan and opinion about it from different experts and organizations.

  19. Global Environmental Planning at the Technical University of Catalonia

    Science.gov (United States)

    Ferrer-Balas, Didac

    2004-01-01

    In 1996 the Technical University of Catalonia (UPC) adopted an Environment Plan which incorporated classical technical education, promoting multidisciplinary environmental research, and improving the environmental performance of university life as a whole. This paper outlines the first environment plan (1996-2001). It discusses its encouraging…

  20. 77 FR 38296 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Science.gov (United States)

    2012-06-27

    ...-2012-0004] Draft Public Health Action Plan--A National Public Health Action Plan for the Detection...), Department of Health and Human Services (HHS). ACTION: Extension of public comment period. SUMMARY: On May 16... National Public Health Action Plan for the Detection, Prevention, and Management of Infertility (77 FR...

  1. 77 FR 28883 - Draft Public Health Action Plan-A National Public Health Action Plan for the Detection...

    Science.gov (United States)

    2012-05-16

    ...-2012-0004] Draft Public Health Action Plan--A National Public Health Action Plan for the Detection...), Department of Health and Human Services (HHS). ACTION: Notice of availability and request for public comment..., Division of Reproductive Health, Attn: National Public Health Action Plan for the Detection, Prevention...

  2. Action plan for renewable energy sources

    International Nuclear Information System (INIS)

    2000-03-01

    In the Finnish Energy Strategy, approved by the Finnish Government in 1997, the emphasis is laid on the importance of bioenergy and other renewable energy sources for the creation of such prerequisites for the Finnish energy economy that the supply of energy can be secured, the price on energy is competitive and the emissions from energy generation are within the limits set by the international commitments made by Finland. In 1998, the European Union Meeting of the Ministers of Energy adopted a resolution taking a positive attitude to the Communication from the Commission 'Energy for the future: Renewable sources of energy' - White Paper for a Community Strategy and Action Plan. National measures play a key role in the achievement of the objectives set in the White Paper. This Action Plan for Renewable Energy Sources is a national programme in line with the EU's White Paper. It comprises all renewable sources of energy available in Finland. It encompasses even peat, which in Finland has traditionally been considered to be a solid biofuel but is internationally classified as one of the non-renewable sources of energy. In the Action Plan, objectives are set for the volume of renewable energy sources used in the year 2010 including a prognosis on the development by the year 2025. The goal is that by the year 2010 the volume of energy generated using renewable energy sources has increased by 50% compared with the year 1995. This would mean an increase by 3 Mtoe, which is about 1 Mtoe more than anticipated in the outlook based on the Finnish Energy Strategy. A further goal is to double the use of renewable energy sources by the year 2025. The aggregate use of renewable energy sources depends to a large extent both on the development of the price on energy produced using other energy sources and on possible changes in the production volume of the Finnish forest industry. The most important objective stated in the Action Plan is to improve the competitiveness of renewable

  3. Action plan for renewable energy sources

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    In the Finnish Energy Strategy, approved by the Finnish Government in 1997, the emphasis is laid on the importance of bioenergy and other renewable energy sources for the creation of such prerequisites for the Finnish energy economy that the supply of energy can be secured, the price on energy is competitive and the emissions from energy generation are within the limits set by the international commitments made by Finland. In 1998, the European Union Meeting of the Ministers of Energy adopted a resolution taking a positive attitude to the Communication from the Commission 'Energy for the future: Renewable sources of energy' - White Paper for a Community Strategy and Action Plan. National measures play a key role in the achievement of the objectives set in the White Paper. This Action Plan for Renewable Energy Sources is a national programme in line with the EU's White Paper. It comprises all renewable sources of energy available in Finland. It encompasses even peat, which in Finland has traditionally been considered to be a solid biofuel but is internationally classified as one of the non-renewable sources of energy. In the Action Plan, objectives are set for the volume of renewable energy sources used in the year 2010 including a prognosis on the development by the year 2025. The goal is that by the year 2010 the volume of energy generated using renewable energy sources has increased by 50% compared with the year 1995. This would mean an increase by 3 Mtoe, which is about 1 Mtoe more than anticipated in the outlook based on the Finnish Energy Strategy. A further goal is to double the use of renewable energy sources by the year 2025. The aggregate use of renewable energy sources depends to a large extent both on the development of the price on energy produced using other energy sources and on possible changes in the production volume of the Finnish forest industry. The most important objective stated in the Action Plan is to improve the

  4. How Military Actions Affected Citizen Security During Plan Colombia

    Science.gov (United States)

    2015-06-01

    ACTIONS AFFECTED CITIZEN SECURITY DURING PLAN COLOMBIA by Graydon Muller June 2015 Thesis Advisor: Thomas C. Bruneau Second Reader: Maiah...COVERED Master’s Thesis 4. TITLE AND SUBTITLE HOW MILITARY ACTIONS AFFECTED CITIZEN SECURITY DURING PLAN COLOMBIA 5. FUNDING NUMBERS 6. AUTHOR...Colombian military’s actions during Plan Colombia and its successor plans. Military actions are often evaluated according to their effect on state

  5. Affirmative Action Plan, October 1991--September 1992

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    This report documents Reynolds Electrical Engineering Co., Inc., analysis of all major job groups with explanations if minorities and females are underutilized in any one or more job group. Goals and timetables have been developed and good faith efforts are directed to correct any deficiencies. In addition, Affirmative Action Plans for the Handicapped, Vietnam Era Veterans, and Disabled Veterans are included which set forth policies, practices, and procedures in accordance with Department of Labor regulations. All personnel decisions are made at the Company level. Decisions regarding the General Manager or Deputy General Manager are made at the corporate level.

  6. Effects of action planning and coping planning within the theory of planned behaviour

    DEFF Research Database (Denmark)

    Pakpour, Amir H.; Zedi, Isa mohammadi; Chatzisarantis, Nikos

    2011-01-01

    Objective: Patients on dialysis have low physical activity levels. The aim of the study was to examine the validity of action planning and coping planning within the theory of planned behaviour framework, for predicting physical activity behaviour of patients on hemodialysis. Methods: One hundred...... and forty four patients who were undergoing emodialysis were selected from dialysis centers. The mean age of the patients was 56.61 (SD= 11.38) years. The patients completed a questionnaire including variables from the theory of planned behaviour, action planning and coping planning. Physical activity...... was prospectively assessed at 4-weeks with the validated International Physical Activity Questionnaire self-report measure. A hierarchical regression analysis was performed to examine the effects of action planning and coping planning on physical activity behaviour. Results: There was a main effect for coping...

  7. Clean slate corrective action investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT).

  8. Clean slate corrective action investigation plan

    International Nuclear Information System (INIS)

    1996-05-01

    The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT)

  9. Task Group on Safety Margins Action Plan (SMAP). Safety Margins Action Plan - Final Report

    International Nuclear Information System (INIS)

    Hrehor, Miroslav; Gavrilas, Mirela; Belac, Josef; Sairanen, Risto; Bruna, Giovanni; Reocreux, Michel; Touboul, Francoise; Krzykacz-Hausmann, B.; Park, Jong Seuk; Prosek, Andrej; Hortal, Javier; Sandervaag, Odbjoern; Zimmerman, Martin

    2007-01-01

    The international nuclear community has expressed concern that some changes in existing plants could challenge safety margins while fulfilling all the regulatory requirements. In 1998, NEA published a report by the Committee on Nuclear Regulatory Activities on Future Nuclear Regulatory Challenges. The report recognized 'Safety margins during more exacting operating modes' as a technical issue with potential regulatory impact. Examples of plant changes that can cause such exacting operating modes include power up-rates, life extension or increased fuel burnup. In addition, the community recognized that the cumulative effects of simultaneous changes in a plant could be larger than the accumulation of the individual effects of each change. In response to these concerns, CSNI constituted the safety margins action plan (SMAP) task group with the following objectives: 'To agree on a framework for integrated assessments of the changes to the overall safety of the plant as a result of simultaneous changes in plant operation / condition; To develop a CSNI document which can be used by member countries to assess the effect of plant change on the overall safety of the plant; To share information and experience.' The two approaches to safety analysis, deterministic and probabilistic, use different methods and have been developed mostly independently of each other. This makes it difficult to assure consistency between them. As the trend to use information on risk (where the term risk means results of the PSA/PRA analysis) to support regulatory decisions is growing in many countries, it is necessary to develop a method of evaluating safety margin sufficiency that is applicable to both approaches and, whenever possible, integrated in a consistent way. Chapter 2 elaborates on the traditional view of safety margins and the means by which they are currently treated in deterministic analyses. This chapter also discusses the technical basis for safety limits as they are used today

  10. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 543: LIQUID DISPOSAL UNITS, NEVADA TEST SITE, NEVADA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-09-01

    The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved Corrective Action Decision Document.

  11. Supplement to a Methodology for Succession Planning for Technical Experts

    Energy Technology Data Exchange (ETDEWEB)

    Kirk, Bernadette Lugue [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Cain, Ronald A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Agreda, Carla L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-11-01

    This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a draft methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, and the methodology is tested through interviews with selected subject matter experts.

  12. Performance improvement plan in customer technical services

    International Nuclear Information System (INIS)

    Lachambre, L.

    1995-01-01

    This presentation centred around the philosophy, goals, and initiatives associated with Gaz Metropolitain's performance improvement plan. Various aspects of the plan including customer surveys, new customer service policies, the creation of small working units, the decentralization of the Montreal service department, and customer-harmonized shift schedules were explored. Implementation of new service plans and contracts, the formation of improvement groups related to human resources, human resource and productivity management, leadership training, and the use of performance indicators were also explained

  13. [Digital action plan for asthma exacerbations (PANAME)].

    Science.gov (United States)

    Beydon, N; Delclaux, C

    2017-11-01

    A written action plan (WAP) reduces emergency visits for asthma exacerbations. However, a WAP is underused and often focused on asthma control. The innovation is an AppWeb that includes an expert software aimed at diagnosing the level of severity of asthma exacerbations and delivering a personalized digital action plan (DAP) when patients are in urgent need of medical advice. Symptoms describing the level of severity of asthma exacerbations and the consequent treatments have been established by working groups of the French Respiratory Societies (SPLF and SP2A for adults and children, respectively). The main objective of the study is to evaluate the effect of the DAP on the frequency of urgent medical attendance. Secondary objectives are to evaluate adherence to the DAP compared to a WAP and the qualitative satisfaction of patients using the DAP. A randomized, prospective, comparative, multicenter study on two parallel groups, conducted in private practice and in hospitals. In both arms, asthmatic patients (240 children aged 6 to 12 years and 270 adults aged 18 to 50 years) with severe asthma exacerbation(s) during the previous year and an Internet connection via a smartphone or a tablet computer, will have at their disposal a WAP and one arm will have, in addition, the DAP. Included patients will be followed up every three months for one year. A decrease in the number of urgent medical attendances and better adherence in the WAP+DAP group compared to the WAP group. Copyright © 2017 SPLF. Published by Elsevier Masson SAS. All rights reserved.

  14. On the Inclusion of Externally Controlled Actions in Action Planning

    NARCIS (Netherlands)

    Tsai, C.C.; Knoblich, G.K.; Sebanz, N.

    2011-01-01

    According to ideomotor theories, perceiving action effects produced by others triggers corresponding action representations in the observer. We tested whether this principle extends to actions performed by externally controlled limbs and tools. Participants performed a go-no-go version of a spatial

  15. On the Inclusion of Externally Controlled Actions in Action Planning

    Science.gov (United States)

    Tsai, Jessica Chia-Chin; Knoblich, Gunther; Sebanz, Natalie

    2011-01-01

    According to ideomotor theories, perceiving action effects produced by others triggers corresponding action representations in the observer. We tested whether this principle extends to actions performed by externally controlled limbs and tools. Participants performed a go-no-go version of a spatial compatibility task in which their own actions…

  16. ECOWindS Joint Action Plan - Guidelines for Implementation

    DEFF Research Database (Denmark)

    2015-01-01

    The Joint Action Plan (JAP) is a deliverable of the European Clusters for Offshore Wind Servicing (ECOWindS) project Work Package 4 (WP4) “Joint Action Plan”. It presents a plan of action or a roadmap for research, development, and innovation (RDI) for the Offshore Wind Service (OWS) industry...

  17. Louisiana ITS business plan : technical summary.

    Science.gov (United States)

    2000-03-01

    The objectives are defined under: 1. Development of the plan, which identifies the preferred program of projects and policy initiatives and outlines the purpose, requirements, responsibilities, estimated cost, and implementation schedule for each pla...

  18. Final Environmental Planning Technical Report. Land Use

    Science.gov (United States)

    1984-01-01

    Courts 4 Rifle Range I Swimming Pool 1 Mat Room (Wrestling, Judo ) I Multipurpose Room -- Tennis Courts 4 -- Volleyball Courts 4 Outdoor Facilities...County. Cheyenne, Wyomi ng. Cheyenne-Laramie County Regional Planning Office 1978 The Land Use Plans for Albin , Burns, Pine Bluffs, and Laramie... Albin , Chugwater, Pine Bluffs, Gering-Scottsbluff, and Kimball) were not considered in the regional recreation analysis. In the settlement year (1991

  19. Stress Tests Worldwide - IAEA Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    Lyons, J.E.

    2012-01-01

    The IAEA nuclear safety action plan relies on 11 important issues. 1) Safety assessments in light of the Fukushima accident: the IAEA secretariat will develop a methodology for stress tests against specific extreme natural hazards and will provide assistance for their implementation; 2) Strengthen existing IAEA peer reviews; 3) Emergency preparedness and response; 4) National Regulatory bodies in terms of independence and adequacy of human and financial resources; 5) The development of safety culture and scientific and technical capacity in Operating Organizations; 6) The upgrading of IAEA safety standards in a more efficient way; 7) A better implementation of relevant conventions concerning nuclear safety and nuclear accidents; 8) To provide a broad assistance on safety standard for countries embarking on a nuclear power program; 9) To facilitate the use of available information, expertise and techniques concerning radiation protection; 10) To enhance the transparency of nuclear industry; and 11) To promote the cooperation between member states in nuclear safety. (A.C.)

  20. Texas strategic action plan for motorcycles : 2013-2018.

    Science.gov (United States)

    2013-06-01

    The Texas Strategic Action Plan for Motorcycles: 2013-2018 provides an integrated : approach to identify implementable strategies and action steps to make the : road environment and infrastructure safer for motorcyclists and other powered : two- and ...

  1. ALWR utility requirements - A technical basis for updated emergency planning

    International Nuclear Information System (INIS)

    Leaver, David E.W.; DeVine, John C. Jr.; Santucci, Joseph

    2004-01-01

    U.S. utilities, with substantial support from international utilities, are developing a comprehensive set of design requirements in the form of a Utility Requirements Document (URD) as part of an industry wide effort to establish a technical foundation for the next generation of light water reactors. A key aspect of the URD is a set of severe accident-related design requirements which have been developed to provide a technical basis for updated emergency planning for the ALWR. The technical basis includes design criteria for containment performance and offsite dose during severe accident conditions. An ALWR emergency planning concept is being developed which reflects this severe accident capability. The main conclusion from this work is that the likelihood and consequences of a severe accident for an ALWR are fundamentally different from that assumed in the technical basis for existing emergency planning requirements, at least in the U.S. The current technical understanding of severe accident risk is greatly improved compared to that available when the existing U.S. emergency planning requirements were established nearly 15 years ago, and the emerging ALWR designs have superior core damage prevention and severe accident mitigation capability. Thus, it is reasonable and prudent to reflect this design capability in the emergency planning requirements for the ALWR. (author)

  2. Features of planned hand actions influence identification of graspable objects.

    Science.gov (United States)

    Bub, Daniel N; Masson, Michael E J; Lin, Terry

    2013-07-01

    We demonstrate that constituents of motor actions associated with handled objects play a role in identifying such objects. Subjects held in working memory action plans for reaching movements; these action plans specified both the hand to be used (left or right) and a wrist orientation (vertical or horizontal). Speeded object identification was impaired when a pictured object matched the action on only one of these two categorical dimensions (e.g., a beer mug with its handle facing left, an action plan involving the right hand and vertical wrist orientation), relative to when the object matched the action on both dimensions or neither dimension. This result implies that identification of a manipulable object leads to automatic retrieval of matching features of a planned action along with nonmatching features to which they are bound. These discrepant features conflict with those of the target object, which results in delayed identification.

  3. Software configuration management plan for the Hanford site technical database

    International Nuclear Information System (INIS)

    GRAVES, N.J.

    1999-01-01

    The Hanford Site Technical Database (HSTD) is used as the repository/source for the technical requirements baseline and programmatic data input via the Hanford Site and major Hanford Project Systems Engineering (SE) activities. The Hanford Site SE effort has created an integrated technical baseline for the Hanford Site that supports SE processes at the Site and project levels which is captured in the HSTD. The HSTD has been implemented in Ascent Logic Corporation (ALC) Commercial Off-The-Shelf (COTS) package referred to as the Requirements Driven Design (RDD) software. This Software Configuration Management Plan (SCMP) provides a process and means to control and manage software upgrades to the HSTD system

  4. Planning my actions to accommodate yours: Joint action development during early childhood

    NARCIS (Netherlands)

    Meyer, M.; Wel, R.P.R.D. van der; Hunnius, S.

    2016-01-01

    The planning and adjusting of one's actions in relation to an action partner is fundamental to smooth joint action. During their first years of life, children gradually become more engaged in joint actions. Here, we investigated whether and at what age children take their partner into account in

  5. BEPS Action Plan: Global Tax Cooperation

    Directory of Open Access Journals (Sweden)

    Andrei Shelepov

    2016-12-01

    Full Text Available Given the dynamics of economic and financial globalization, national tax authorities often do not have adequate tools to effectively combat tax avoidance practices that exploit gaps in the existing tax rules. To address the global problem of tax base erosion and profit shifting (BEPS, the Organisation for Economic Co-operation and Development (OECD and the Group of 20 (G20 have consolidated their efforts on an equal footing. Their joint BEPS Action Plan allowed to involve more than 100 countries, both developing and advanced, in designing and implementing rules aimed at aligning the generation of profits and their taxation and increasing the predictability, transparency and flexibility of the international tax environment for business. This article examines the history of the BEPS project, emphasizing the mode of OECD-G20 engagement in global tax governance, describes the key recommendations made by international institutions to tackle BEPS and forecasts further developments in the area. The author pays special attention to the mechanisms designed to stimulate participation by non-OECD and non-G20 members in the BEPS project and the stance of business on the proposed reforms. He concludes that the work on BEPS is far from finished. Different interpretations of standards, risks of strengthening tax competition between countries and potentially excessive tax burdens on businesses should be addressed. In this regard, OECD and G20 should strengthen their efforts to ensure the participation of developing countries and the private sector, which would stimulate other reforms in international taxation to support global growth and development.

  6. Smart Buildings: Business Case and Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ehrlich, Paul; Diamond, Rick

    2009-04-01

    General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

  7. The effectiveness of community action plans on farmers' livelihood in ...

    African Journals Online (AJOL)

    Community Action Plans have been introduced by the Directorate of Extension and Engineering as a tool for implementing the Farming Systems Research and Extension approach in the Caprivi Region of Namibia. Although Community Action Plans (CAP) is a useful tool for implementing the FSRE approach in rural ...

  8. Local climate action plans in climate change mitigation

    DEFF Research Database (Denmark)

    Damsø, Tue Noa Jacques; Kjær, Tyge; Christensen, Thomas Budde

    2016-01-01

    The article examines the climate action plans (CAPs) of local governments (LGs) in Denmark. Applying a quantitative content analysis approach, all available Danish LG action plans within the climate and energy field has been collected and coded, giving insight into the extent of LG CAPs. We assess...

  9. Assessment of the 2004 Danish National Action Plan for Emplyment

    DEFF Research Database (Denmark)

    Emerek, Ruth

    The report gives the economic, employment and policy context for the National Action Plan for employment, and assess the NAP from a gender persepctive......The report gives the economic, employment and policy context for the National Action Plan for employment, and assess the NAP from a gender persepctive...

  10. Effects of written action plan adherence on COPD exacerbation recovery

    NARCIS (Netherlands)

    Bischoff, E.W.M.A.; Hamd, D.H.; Sedeno, M.; Benedetti, A.; Schermer, T.R.J.; Bernard, S.; Maltais, F.; Bourbeau, J.

    2011-01-01

    BACKGROUND: The effects of written action plans on recovery from exacerbations of chronic obstructive pulmonary disease (COPD) have not been well studied. The aims of this study were to assess the effects of adherence to a written action plan on exacerbation recovery time and unscheduled healthcare

  11. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements

  12. 78 FR 43091 - Technical Operations Safety Action Program (T-SAP) and Air Traffic Safety Action Program (ATSAP)

    Science.gov (United States)

    2013-07-19

    ...; ] DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 193 Technical Operations Safety Action Program (T-SAP) and Air Traffic Safety Action Program (ATSAP) AGENCY: Federal Aviation Administration (FAA), Department of Transportation (DOT). ACTION: Notice of Proposed Order Designating Safety...

  13. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  14. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements

  15. National Action Plan for Energy Efficiency Report

    Energy Technology Data Exchange (ETDEWEB)

    National Action Plan for Energy Efficiency

    2006-07-01

    Summarizes recommendations, key barriers, and methods for energy efficiency in utility ratemaking as well as revenue requirements, resource planning processes, rate design, and program best practices.

  16. Electric driving accelerated. Action Plan 2011-2015. Annex 2

    International Nuclear Information System (INIS)

    2011-10-01

    The Dutch Action Plan for Electric Driving gives form and substance to the ambition of the Dutch government to accelerate the market introduction of electric cars in the Netherlands. This plan is not only focused on the electric passenger car. To promote the electrification of transport, also electric garbage trucks, buses, scooters and possibly pleasure boats are included in the plan. [nl

  17. Documentation of a Model Action Plan to Deter Illicit Nuclear Trafficking

    International Nuclear Information System (INIS)

    Smith, D; Kristo, M; Niemeyer, S; Dudder, G

    2006-01-01

    Theft, illegal possession, smuggling, or attempted unauthorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures

  18. Documentation of a model action plan to deter illicit nuclear trafficking

    International Nuclear Information System (INIS)

    Smith, D.K.; Kristo, M.J.; Niemeyer, S.; Dudder, G.B.

    2008-01-01

    Theft, illegal possession, smuggling, or attempted unauthorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures. (author)

  19. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs.

  20. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs

  1. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Golder Associates, Inc.

    2003-04-22

    The Yakima Urban Growth Area (UGA) is a developing and growing urban area in south-central Washington. Despite increased development, the Yakima River and its tributaries within the UGA continue to support threatened populations of summer steelhead and bull trout as well as a variety of non-listed salmonid species. In order to provide for the maintenance and recovery of these species, while successfully planning for the continued growth and development within the UGA, the City of Yakima has undertaken the Yakima Habitat Improvement Project. The overall goal of the project is to maintain, preserve, and restore functioning fish and wildlife habitat within and immediately surrounding the Yakima UGA over the long term. Acquisition and protection of the fish and wildlife habitat associated with key properties in the UGA will prevent future subdivision along riparian corridors, reduce further degradation or removal of riparian habitat, and maintain or enhance the long term condition of aquatic habitat. By placing these properties in long-term protection, the threat of development from continued growth in the urban area will be removed. To most effectively implement the multi-year habitat acquisition and protection effort, the City has developed this Master Plan. The Master Plan provides the structure and guidance for future habitat acquisition and restoration activities to be performed within the Yakima Urban Area. The development of this Master Plan also supports several Reasonable and Prudent Alternatives (RPAs) of the NOAA Fisheries 2000 Biological Opinion (BiOp), as well as the Water Investment Action Agenda for the Yakima Basin, local planning efforts, and the Columbia Basin Fish and Wildlife Authority's 2000 Fish and Wildlife Program. This Master Plan also provides the framework for coordination of the Yakima Habitat Improvement Project with other fish and wildlife habitat acquisition and protection activities currently being implemented in the area. As a

  2. Technical assistance contractor management plan: Surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC's mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel

  3. Indonesia and the BRICS: Implementing the BEPS Action Plan

    Directory of Open Access Journals (Sweden)

    Andrey Shelepov

    2017-12-01

    Full Text Available Tax base erosion and profit shifting (BEPS is a global problem. Finding solutions is a challenge for most countries. The global economic crisis led to a new environment and requirements for doing business. These requirements have been developed by two key international institutions: the Organisation for Economic Cooperation and Development (OECD and the Group of 20 (G20. This approach has engaged the developed and developing countries that are members of these institutions, as well as a significant number of partner countries. As a result, more than 100 countries have confirmed their commitment to the BEPS Action Plan. This article assesses the level of implementation of the BEPS Plan in Indonesia and in the BRICS countries of Brazil, Russia, India, China and South Africa. The author monitored their activities for 13 of the 15 actions (excluding Actions 11 and 15 and identifies several best practices that can be used by Russia. Monitoring considered implemented and planned actions, primarily amendments to and new norms in relevant national legislation, as well as the expected implementation time for all BEPS actions. In addition, the author assessed institutional environments created to implement the provisions of the Action Plan, consultation processes and mechanisms for informing stakeholders. Analysis shows that approaches to implementing the BEPS Action Plan differ among the six countries. Although several lag behind in terms of their implementation schedule, each country has demonstrated some efforts that can be considered best practices. Russia has succeeded the most in implementing the Action Plan

  4. National climate change action plans: Interim report for developing and transition countries

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, R.; Ness, E.; Hirst, J. [eds.

    1997-10-01

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

  5. Salt Repository Project. FY-84 technical project plan

    International Nuclear Information System (INIS)

    1984-08-01

    The FY 84 technical plans for the Salt Repository Project (SRP) are briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management (CRWM) program are discused and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 Work Breakdown Structure Tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities, Exploratory Shaft, Land Acquisition, and Program Management) in an appendix. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. Milestones and their definitions for the plan year, as well as milestones for the outyears are also presented at this same subtask level for each subtask

  6. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  7. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action

    Directory of Open Access Journals (Sweden)

    Sanjeev Sridharan

    2016-09-01

    Full Text Available Background: Mainstreaming of gender, equity, and human rights (GER is an important focus of the World Health Organization (WHO and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design: A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results: GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions: Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations.

  8. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action.

    Science.gov (United States)

    Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April

    2016-01-01

    Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations.

  9. Corrective Action Plan for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1998-08-31

    This corrective action plan provides the closure implementation methods for the Area 3 Landfill Complex, Corrective Action Unit (CAU) 424, located at the Tonopah Test Range. The Area 3 Landfill Complex consists of 8 landfill sites, each designated as a separate corrective action site.

  10. IAEA Sets Up Team to Drive Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: The International Atomic Energy Agency is setting up a Nuclear Safety Action Team to oversee prompt implementation of the IAEA Action Plan on Nuclear Safety and ensure proper coordination among all stakeholders. The 12-point Action Plan, drawn up in the wake of the Fukushima Daiichi accident, was approved by the Agency's Board of Governors on 13 September and endorsed by all 151 Member States at its General Conference last week. The team will work within the Agency's Department of Nuclear Safety and Security, headed by Deputy Director General Denis Flory, and will coordinate closely with the Director General's Office for Policy. ''The Action Plan requires immediate follow-up,'' Director General Yukiya Amano said. ''This compact, dedicated team will assist Deputy Director General Flory in implementing the measures agreed in the Action Plan.'' Gustavo Caruso, Head of the Regulatory Activities Section in the IAEA's Division of Installation Safety, has been designated as the team's Special Coordinator for the implementation of the Action Plan. The IAEA has already started implementing its responsibilities under the Action Plan, including development of an IAEA methodology for stress tests for nuclear power plants. The methodology will be ready in October. (IAEA)

  11. Government of Canada Action Plan 2000 on Climate Change

    International Nuclear Information System (INIS)

    2000-01-01

    In this first National Climate Change Business Plan the Government of Canada affirms its intention to invest up to $500 million over five years on specific actions to reduce greenhouse gas emissions. This sum is in addition to the action plans being put forward by the provincial and territorial governments and in addition to the $625 million investment over five years announced in Budget 2000. Action Plan 2000 targets key sectors, and the measures announced are expected to take Canada one third of the way to achieving the target established in the Kyoto Protocol by reducing Canada's GHG emissions by 65 megatonnes per year during the 2008-2012 commitment period. The key sectors targeted include the areas of transportation, oil, gas and electricity production, industry, buildings, forestry and agriculture, i. e. sectors that together account for over 90 per cent of Canada's GHG emissions.The Action Plan focuses on reducing GHG emissions in a cost effective way; draws extensively on the best ideas put forward by the provinces, territories and other stakeholders; encourages action by industry and consumers; complements measures and actions by the provinces and territories to address regional issues; and sets the stage for long-term behavioural, technological and economic changes. The remainder of Canada's Kyoto commitments will be addressed by actions in future plans which are currently in the process of being developed, together with the development of further details of this first National Climate Change Business Plan

  12. Developing Action Plans Based on Strategy

    DEFF Research Database (Denmark)

    Vinter, Otto; Carstensen, Peter H.

    2018-01-01

    The authors have performed a thorough study of the change strategy literature that is the foundation for the 10 overall change strategies defined in ISO/IEC 33014. Then the authors identified eight aspects that should be considered when developing the concrete actions for executing the strategy....

  13. 24 CFR 91.220 - Action plan.

    Science.gov (United States)

    2010-04-01

    ... transition to permanent housing and independent living, specific action steps to end chronic homelessness... ameliorate the negative effects of public policies that serve as barriers to affordable housing. Such... prevent homelessness of the individual or family; tenant-based rental assistance; and units provided in...

  14. Adverse Drug Event Prevention: 2014 Action Plan Conference.

    Science.gov (United States)

    Ducoffe, Aaron R; Baehr, Avi; Peña, Juliet C; Rider, Briana B; Yang, Sandra; Hu, Dale J

    2016-09-01

    Adverse drug events (ADEs) have been highlighted as a national patient safety and public health challenge by the National Action Plan for Adverse Drug Event Prevention (ADE Action Plan), which was released by the Office of Disease Prevention and Health Promotion in August 2014. The following October, the ADE Prevention: 2014 Action Plan Conference provided an opportunity for federal agencies, national experts, and stakeholders to coordinate and collaborate in the initiative to reduce preventable ADEs. The single-day conference included morning plenary sessions focused on the surveillance, evidence-based prevention, incentives and oversights, and additional research needs of the drug classes highlighted in the ADE Action Plan: anticoagulants, diabetes agents, and opioids. Afternoon breakout sessions allowed for facilitated discussions on measures for tracking national progress in ADE prevention and the identification of opportunities to ensure safe and high-quality health care and medication use. © The Author(s) 2015.

  15. Learning through Participatory Action Research for Community Ecotourism Planning.

    Science.gov (United States)

    Guevara, Jose Roberto Q.

    1996-01-01

    Ecologically sound tourism planning and policy require an empowering community participation. The participatory action research model helps a community gain understanding of its social reality, learn how to learn, initiate dialog, and discover new possibilities for addressing its situation. (SK)

  16. 24 Command Fire Improvement Action Program Plan

    International Nuclear Information System (INIS)

    GRIFFIN, G.B.

    2000-01-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements

  17. The Norwegian Plan of Action for nuclear safety issues

    International Nuclear Information System (INIS)

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects

  18. Joint action without and beyond planning

    DEFF Research Database (Denmark)

    Blomberg, Olle

    2013-01-01

    toward a common goal. With Bratman’s account as a foil, I address two lacunas that are relatively unexplored in the philosophical literature. The first lacuna concerns how to make sense of the apparently joint cooperative activities of agents that lack the capacities for planning and “mindreading...

  19. 24 CFR 91.320 - Action plan.

    Science.gov (United States)

    2010-04-01

    ... investment geographically. When appropriate, the state should estimate the percentage of funds they plan to... institutional structure, enhance coordination between public and private housing and social service agencies... applications from local governments for funding, including the relative importance of the criteria, where...

  20. Dynamics in self-regulation : Plan execution self-efficacy and mastery of action plans

    OpenAIRE

    Scholz, Urte; Sniehotta, Falco F.; Schüz, Benjamin; Oeberst, Andries

    2007-01-01

    This study investigated whether an individual's plan execution self-efficacy precedes mastery of the respective action plan or vice versa. Study participants were 122 cardiac rehabilitation patients. Plan execution self-efficacy and mastery of a personal action plan on physical activity were assessed each week for 6 weeks after discharge from rehabilitation. Physical exercise was assessed 2 months after discharge. Multilevel cross-lagged panel analyses resulted in a positive effect of mastery...

  1. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  2. Office of Crystalline Repository Development FY 83 technical project plan

    International Nuclear Information System (INIS)

    1983-03-01

    The technical plan for FY 83 activities of the Office of Crystalline Repository Development is presented in detail. Crystalline Rock Project objectives are discussed in relation to the National Waste Terminal storage (NWTS) program. The plan is in full compliance with requirements mandated by the Nuclear Waste Policy Act of 1982. Implementation will comply with the requirements and criteria set forth in the Nuclear Regulatory Commission regulations (10 CFR 60) and the Environmental Protection Agency standard (40 CFR 191). Technical approaches and the related milestones and schedules are presented for each of the Level 3 NWTS work Breakdown Structure Tasks. These are: Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities and Excavations, Land Acquisition, and Program Management

  3. Climate Action Planning at the University of New Hampshire

    Science.gov (United States)

    Cleaves, Sara M.; Pasinella, Brett; Andrews, Jennifer; Wake, Cameron

    2009-01-01

    Purpose: The purpose of this paper is to discuss the recent history of climate action planning at the University of New Hampshire (UNH), a public university with a long history of sustainability action and commitment. Items discussed include a partnership with Clean Air-Cool Planet (CA-CP) to produce a greenhouse gas (GHG) inventory tool that…

  4. Task technical plan: DWPF air permit/dispersion modeling

    International Nuclear Information System (INIS)

    Lambert, D.P.

    1993-01-01

    This Task Technical Plan summarizes work required to project the benzene emissions from the Late Wash Facility (LWF) as well as update the benzene, mercury, and NO x emissions from the remainder of the Defense Waste Processing Facility (DWPF). These calculations will reflect (1) the addition of the LWF and (2) the replacement of formic acid with nitric acid in the melter preparation process. The completed calculations will be used to assist DWPF in applying for the LWF Air Quality Permit

  5. Visions, Scenarios and Action Plans Towards Next Generation Tanzania Power System

    Directory of Open Access Journals (Sweden)

    Alex Kyaruzi

    2012-10-01

    Full Text Available This paper presents strategic visions, scenarios and action plans for enhancing Tanzania Power Systems towards next generation Smart Power Grid. It first introduces the present Tanzanian power grid and the challenges ahead in terms of generation capacity, financial aspect, technical and non-technical losses, revenue loss, high tariff, aging infrastructure, environmental impact and the interconnection with the neighboring countries. Then, the current initiatives undertaken by the Tanzania government in response to the present challenges and the expected roles of smart grid in overcoming these challenges in the future with respect to the scenarios presented are discussed. The developed scenarios along with visions and recommended action plans towards the future Tanzanian power system can be exploited at all governmental levels to achieve public policy goals and help develop business opportunities by motivating domestic and international investments in modernizing the nation’s electric power infrastructure. In return, it should help build the green energy economy.

  6. Technical Work Plan for: Fracture and Lithophysal Studies

    Energy Technology Data Exchange (ETDEWEB)

    n

    2006-09-11

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models.

  7. Technical Work Plan for: Fracture and Lithophysal Studies

    International Nuclear Information System (INIS)

    2006-01-01

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models

  8. Plan Puebla-Panama: Actions and results of an administration

    International Nuclear Information System (INIS)

    Archila, Raul

    2003-01-01

    The author of the article explains the main actions and results of the Plan Puebla Panama, also describes the interconnected power systems of Central America with Mexico, the financial plans given by the Banco Interamericano de Desarrollo and the Japan Bank of International Cooperation for the projects of geothermal energy, and the infraestructure to be built with the differents projects of energy

  9. White House Climate Action Plan Hotly Debated in Senate Hearing

    Science.gov (United States)

    Showstack, Randy

    2014-01-01

    Emotions ran high among senators at a 16 January U.S. Senate hearing on the White House's Climate Action Plan; the hearing included administration officials and other supporters of the plan as well as opponents. The plan, which President Barack Obama presented in June 2013 (see Eos, 94(27), 239, doi:10.1002/2013EO270003), calls for cutting carbon pollution, preparing the nation for the impacts of climate change, and leading international efforts to address climate change.

  10. Application of action planning to PES systems

    OpenAIRE

    Paredes Cuervo, Diego; Arango Ramírez, Alejandro

    2008-01-01

    Buscando aportar una de las primeras aproximaciones metodológicas al tema del pago por servicios ambientales (PSA) en la cuenca del río Otún (Risaralda, Colombia) se propuso un plan de acción para la instalación de un sistema de PSA en la zona. El resultado principal de este proceso fue la definición de las actividades, responsabilidades y recursos para la implementación de un proyecto piloto de PSA enfocado en la calidad hídrica y la conservación de la biodiversidad y que incluirá como p...

  11. Environmental restoration and remediation technical data management plan

    International Nuclear Information System (INIS)

    Key, K.T.; Fox, R.D.

    1994-02-01

    The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit

  12. NEAP - National Environmental Action Plan (Republic of Macedonia)

    International Nuclear Information System (INIS)

    Shnajder-Jakobi, Martin; Anastasovski, Vasil; Gorgievski, Kire.

    1997-01-01

    The Republic of Macedonia, like other Central and East European countries in transition, has started the process of reform towards a market economy. As a part of the economic development program, the Republic of Macedonia is shaping its environmental polices and identifying priority actions to protect human health and the environment and to utilize its natural resources in a sustainable manner. These polices and actions are consistent with the 'Environmental Action Programme for Central and Eastern Europe' (EAP), the document adopted at the Ministerial Conference in Lucerne in 1993. In meeting the goals towards protecting the environment, The Government of the Republic of Macedonia has prepared the National Environmental Action Plan (NEAP) with the support of the World Bank group. The Ministry of Urban Planning, Construction and Environment was the key agency involved in the preparation of the NEAP. The NEAP highlights the environmental problems and recommends actions related to policy, institutions and priority investments. (author)

  13. 'Action 2016': AREVA's strategic action plan; AREVA presente son Plan d'Actions Strategique 'Action 2016'

    Energy Technology Data Exchange (ETDEWEB)

    Marie, Patricia; Briand, Pauline; Floquet-Daubigeon, Fleur; Michaut, Maxime; De Scorbiac, Marie; Du Repaire, Philippine

    2011-12-13

    On December 13, 2011, Luc Oursel, CEO, and Pierre Aubouin, Chief Financial Officer presented the group's strategic plan for the period 2012-2016. The plan has been drawn up collectively and is based on a thorough-going analysis and a realistic assessment of perspectives for all group activities and associated resources. Development of nuclear and renewable energies: the fundamentals are unchanged. In this context, the German decision remains an isolated case and the great majority of nuclear programs around the world have been confirmed. More conservative in its projections than the International Energy Agency, the group expects growth of 2.2% annually, reaching 583 GW of installed nuclear capacity by 2030, against 378 GW today. However, the Fukushima accident will lead to delays in launching new programs. 'Action 2016' plan aims to consolidate AREVA's leadership in nuclear energy and become a leading player in renewable energy. The group's strategic action plan 'Action 2016' is based on the following strategic choices: - commercial priority given to value creation, - selectivity in investments, - strengthening of the financial structure. These demand an improvement in the group's performance by 2015. This plan makes nuclear safety a strategic priority for the industrial and commercial performance of the group. This ambitious performance plan for the period 2012-2016 will give the group the wherewithal to withstand a temporary slowdown in the market resulting from the Fukushima accident and to deliver safe and sustainable growth of the business. The plan sets out the strategic direction for the group's employees for the years ahead: taking advantage of the expected growth in nuclear and renewable energies, targeted investment programs, and return to self-financing as of 2014

  14. Implications of Incessant Strike Actions on the Implementation of Technical Education Programme in Nigeria

    Science.gov (United States)

    Adavbiele, J. A.

    2015-01-01

    This paper was designed to x-ray the implications of incessant strike actions on the implementation of Technical education programme in Nigeria. The paper took an exploratory view on the concept of strike actions in Nigeria with particular references on notable strike actions that have occurred in Nigeria. The types of strike were explained and…

  15. Project development and technical development plan. New York Bight Project

    International Nuclear Information System (INIS)

    1977-07-01

    The Marine EcoSystems Analysis (MESA) Project Development Plan has been jointly prepared by the MESA Program Office and the New York Bight Project Staff and represents the overall plan for project implementation. The plan describes a systematic approach to achieving specifically identified goals and objectives that have been delegated to the Department of Commerce for protection of the marine environment. The overall goals of the Project are to develop a comprehensive understanding of the processes and interrelationships of the ecosystem and to determine the fate and effects of pollutants and other man-related stresses on the New York Bight. More specific goals include planning for future actions such as monitoring of the Bight, oil and gas development, offshore nuclear power generation, and the development of alternatives to existing waste disposal strategies

  16. The neural basis of predicting the outcomes of planned actions

    Directory of Open Access Journals (Sweden)

    Andrew eJahn

    2011-11-01

    Full Text Available A key feature of human intelligence is the ability to predict the outcomes of one’s own actions prior to executing them. Action values are thought to be represented in part in the dorsal and ventral medial prefrontal cortex, yet current studies have focused on the value of executed actions rather than the anticipated value of a planned action. Thus, little is known about the neural basis of how individuals think (or fail to think about their actions and the potential consequences before they act. We scanned individuals with fMRI while they thought about performing actions that they knew would likely be correct or incorrect. Here we show that merely imagining an error, as opposed to imagining a correct outcome, increases activity in the dorsal anterior cingulate cortex, independently of subsequent actions. This activity overlaps with regions that respond to actual error commission. The findings show a distinct network that signals the prospective outcomes of one’s planned actions. A number of clinical disorders such as schizophrenia and drug abuse involve a failure to take the potential consequences of an action into account prior to acting. Our results thus suggest how dysfunctions of the medial prefrontal cortex may contribute to such failures.

  17. Promoting action control and coping planning to improve hand hygiene.

    Science.gov (United States)

    Reyes Fernández, Benjamín; Lippke, Sonia; Knoll, Nina; Blanca Moya, Emanuel; Schwarzer, Ralf

    2015-09-25

    We examined a brief educational intervention addressing hand hygiene self-regulatory mechanisms, and evaluated which psychological mechanisms may lead to hand hygiene behaviours. Two hundred forty two students (mean age = 21 years, SD = 3.9) received either an experimental (n = 149) or a control condition on action control and planning (n = 93). Hand hygiene, coping planning, and action control were measured at baseline and six weeks later. By applying repeated measures ANOVA, we compared the experimental condition addressing planning to perform hand hygiene with a control condition. Additionally, working mechanisms were evaluated by means of mediation analysis. The intervention had an effect on action control, as reflected by a time by treatment interaction. The direct effect of the intervention on behaviour was, however, non-significant. Changes in action control led to changes in coping planning. These social-cognitive changes mediated the effect of intervention on behaviour, after controlling for gender, baseline behaviour, and classroom membership. In spite of the associations between the intervention and self-regulatory strategies, no direct effect was found of the intervention on behaviour. Further research on how to increase hand sanitizing, involving enviromental characteristics, is required. The intervention led only indirectly to an improvement of hand hygiene via changes in self-regulatory factors. Results indicate the importance of promoting action control and coping planning to initiate changes in hand hygienic behaviours.

  18. Action plan for electric mobility in Canada

    International Nuclear Information System (INIS)

    Gilbert, R.; Cormier, A.; Lavallee, P.

    2005-01-01

    Electric mobility is an important emerging industry in Canada, where there is significant expertise in electric and hybrid vehicles, batteries, hybrid technologies, grid-connected technologies and fuel cell vehicles. This paper presented a case for the formation of Electric Mobility Canada, a proposed network of private companies and public sector agencies that aims to stimulate industry and provide support to government agencies involved with meeting Canada's obligations under the Kyoto Protocol, as well as in new industry sectors. The environmental, health, economic and industrial benefits of electric mobility were outlined. Current programs for electric mobility were reviewed, and details of financial incentives and initiatives were presented. An overview of electric mobility programs in the United States and Europe was provided. Research and development needs were evaluated. The former Electric Vehicle Association of Canada was discussed. An organizational structure for the proposed network was presented, along with a mission statement and outline of future goals. Recommendations for the future of the network included identifying short and long-term market opportunities for electric mobility technologies for all surface transport modes in Canada; determining research and development needs and appropriate funding and investment opportunities; determining other actions necessary to allow the electric mobility industry to play a growing role in meeting Canada's transport needs; and raising public awareness of the importance of electric mobility trends. It was concluded that the federal government should be approached for start-up funds for the network, which will be followed by further investment from provincial and business interests once the network is in place and functioning. 84 refs

  19. Action plans can interact to hinder or facilitate reach performance.

    Science.gov (United States)

    Fournier, Lisa R; Wiediger, Matthew D; Taddese, Ezana F

    2015-11-01

    Executing a reach action can be delayed while retaining another action in working memory (WM) if the two action plans partly overlap rather than do not overlap. This delay (partial repetition cost) occurs when reach responses are under cognitive control. In this study, we investigated whether facilitation (a partial repetition benefit) occurs when reach responses are automatic. We also examined whether the hemisphere controlling the limb or selection of the preferred limb (based on a free-reach task) influences reach performance when the actions partly overlap. Left- and right-handers reached to different stimulus locations to the left and right of body midline with their ipsilateral hand while maintaining an action plan in WM that required the same or the different hand. The results showed a partial repetition benefit for spatially compatible reaches to left and right stimulus locations far from the body midline, but not for those near the body midline. Also, no partial repetition cost was found at any of the stimulus-reach locations. This indicates that automatic reach responses that partly overlap with an action plan maintained in WM are not delayed, but instead can be facilitated (partial repetition benefit). The roles of hemisphere and reach-hand preference in action control and the importance of the degree of feature overlap in obtaining a partial repetition benefit (and cost) are discussed.

  20. Corrective Action Investigation Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada: Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-05-03

    The general purpose of this Corrective Action Investigation Plan is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective action alternatives (CAAs) for Corrective Action Unit (CAU) 543: Liquid Disposal Units, Nevada Test Site (NTS), Nevada. Located in Areas 6 and 15 on the NTS, CAU 543 is comprised of a total of seven corrective action sites (CASs), one in Area 6 and six in Area 15. The CAS in Area 6 consists of a Decontamination Facility and its components which are associated with decontamination of equipment, vehicles, and materials related to nuclear testing. The six CASs in Area 15 are located at the U.S. Environmental Protection Agency Farm and are related to waste disposal activities at the farm. Sources of possible contamination at Area 6 include potentially contaminated process waste effluent discharged through a process waste system, a sanitary waste stream generated within buildings of the Decon Facility, and radiologically contaminated materials stored within a portion of the facility yard. At Area 15, sources of potential contamination are associated with the dairy operations and the animal tests and experiments involving radionuclide uptake. Identified contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, petroleum hydrocarbons, pesticides, herbicides, polychlorinated biphenyls, metals, and radionuclides. Three corrective action closure alternatives - No Further Action, Close in Place, or Clean Closure - will be recommended for CAU 543 based on an evaluation of all the data quality objective-related data. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of CAAs that will be presented in the Corrective Action Decision Document.

  1. From action planning and plan enactment to fruit consumption: moderated mediation effects.

    Science.gov (United States)

    Kasten, Stefanie; van Osch, Liesbeth; Eggers, Sander Matthijs; de Vries, Hein

    2017-10-23

    Sufficient fruit consumption is beneficial for a healthy live. While many Dutch adults intent to eat the recommended amount of fruit, only 5-10% of the population actually adheres to the recommendation. One mechanism that can help to narrow this gap between intention and actual fruit consumption is action planning. However, action planning is only assumed to be effective if plans are enacted. This study assessed which action plans are made and enacted, and further aimed to investigate two main hypotheses: 1. the effect of action planning (at T1) on fruit consumption (at T2) is mediated by plan enactment (at T3); 2. positive intentions (2a), high self-efficacy (2b) and a strong habit to eat fruit (2c) enhance the mediation of plan enactment, whereas a strong habit to eat snacks (2d) hinders the mediation of plan enactment. This study was a self-reported longitudinal online survey study. A total of 428 participants filled in a survey, measuring demographic factors (e.g. gender, age, education level), several socio-cognitive constructs (i.e. attitudes, self-efficacy, habit, action planning, plan enactment), and fruit consumption, at three points in time (baseline, after 1 month, and after 3 months). Mediation and moderated mediation analyses were used to investigate the planning-plan enactment- fruit consumption relationship. Up to 70% of the participants reported to have enacted their T1 action plans at T2. Action planning on fruit consumption was fully mediated by plan enactment (Hypothesis 1). All four proposed moderators (i.e. intention, self-efficacy, habit to consume fruit, and habit to consume snacks) significantly influenced the mediation (Hypotheses 2a-2d). Mediation of plan enactment was only present with high levels of intention, high levels of self-efficacy, strong habits to eat fruit, and weak habits to eat snacks. The study suggests the importance of plan enactment for fruit consumption. Furthermore, it emphasizes the necessity of facilitating factors

  2. From action planning and plan enactment to fruit consumption: moderated mediation effects

    Directory of Open Access Journals (Sweden)

    Stefanie Kasten

    2017-10-01

    Full Text Available Abstract Objectives Sufficient fruit consumption is beneficial for a healthy live. While many Dutch adults intent to eat the recommended amount of fruit, only 5–10% of the population actually adheres to the recommendation. One mechanism that can help to narrow this gap between intention and actual fruit consumption is action planning. However, action planning is only assumed to be effective if plans are enacted. This study assessed which action plans are made and enacted, and further aimed to investigate two main hypotheses: 1. the effect of action planning (at T1 on fruit consumption (at T2 is mediated by plan enactment (at T3; 2. positive intentions (2a, high self-efficacy (2b and a strong habit to eat fruit (2c enhance the mediation of plan enactment, whereas a strong habit to eat snacks (2d hinders the mediation of plan enactment. Methods This study was a self-reported longitudinal online survey study. A total of 428 participants filled in a survey, measuring demographic factors (e.g. gender, age, education level, several socio-cognitive constructs (i.e. attitudes, self-efficacy, habit, action planning, plan enactment, and fruit consumption, at three points in time (baseline, after 1 month, and after 3 months. Mediation and moderated mediation analyses were used to investigate the planning-plan enactment- fruit consumption relationship. Results Up to 70% of the participants reported to have enacted their T1 action plans at T2. Action planning on fruit consumption was fully mediated by plan enactment (Hypothesis 1. All four proposed moderators (i.e. intention, self-efficacy, habit to consume fruit, and habit to consume snacks significantly influenced the mediation (Hypotheses 2a-2d. Mediation of plan enactment was only present with high levels of intention, high levels of self-efficacy, strong habits to eat fruit, and weak habits to eat snacks. Conclusion The study suggests the importance of plan enactment for fruit consumption

  3. Predicting Plan Failure by Monitoring Action Sequences and Duration

    Directory of Open Access Journals (Sweden)

    Giovani Parente FARIAS

    2017-07-01

    Full Text Available An agent can attempt to achieve multiple goals and each goal can be achieved by applying various different plans. Anticipating failures in agent plan execution is important to enable an agent to develop strategies to avoid or circumvent such failures, allowing the agent to achieve its goal. Plan recognition can be used to infer which plans are being executed from observations of sequences of activities being performed by an agent. Symbolic Plan Recognition is an algorithm that represents knowledge about the agents under observation in the form of a plan library. In this work, we use this symbolic algorithm to find out which plan the agent is performing and we develop a failure prediction system, based on information available in the plan library and in a simplified calendar which manages the goals the agent has to achieve. This failure predictor is able to monitor the sequence of agent actions and detects if an action is taking too long or does not match the plan that the agent was expected to be performing. We have successfully employed this approach in a health-care prototype system.

  4. UMTRA technical assistance contractor quality assurance program plan

    International Nuclear Information System (INIS)

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements

  5. Transformation of a virtual action plan into a motor plan in the premotor cortex.

    Science.gov (United States)

    Nakayama, Yoshihisa; Yamagata, Tomoko; Tanji, Jun; Hoshi, Eiji

    2008-10-08

    Before preparing to initiate a forthcoming motion, we often acquire information about the future action without specifying actual motor parameters. The information for planning an action at this conceptual level can be provided with verbal commands or nonverbal signals even before the associated motor targets are visible. Under these conditions, the information signifying a virtual action plan must be transformed to information that can be used for constructing a motor plan to initiate specific movements. To determine whether the premotor cortex is involved in this process, we examined neuronal activity in the dorsal premotor cortex (PMd) of monkeys performing a behavioral task designed to isolate the behavioral stages of the acquisition of information for a future action and the construction of a motor plan. We trained the animals to receive a symbolic instruction (color and shape of an instruction cue) to determine whether to select the right or left of targets to reach, despite the physical absence of targets. Subsequently, two targets appeared on a screen at different locations. The animals then determined the correct target (left or right) based on the previous instruction and prepared to initiate a reaching movement to an actual target. The experimental design dissociated the selection of the right/left at an abstract level (action plan) from the physical motor plan. Here, we show that activity of individual PMd neurons initially reflects a virtual action plan transcending motor specifics, before these neurons contribute to a transformation process that leads to activity encoding a motor plan.

  6. Looking at the formulation of national biosecurity education action plans

    Science.gov (United States)

    Sture, J.; Minehata, M.; Shinomiya, N.

    2015-01-01

    In order for states to be assured of their compliance with the requirements of the Biological and Toxin Weapons Convention, it is necessary that all those science and policy stakeholders working within that state should be aware of their responsibilities under the Convention. This can only be achieved through a comprehensive national biosecurity education programme. We propose that each state should produce a national biosecurity action plan, with accompanying resources and materials to achieve this. A number of resources are already available online to support states in this challenge. We present a model for a national biosecurity action plan and propose a number of ways in which this may be achieved. PMID:22606763

  7. A soil plan of action to awaken society beyond 2015

    Science.gov (United States)

    Jones, Arwyn; Bampa, Francesca; Towers, Willie; Broll, Gabrielle; Vargas, Ronald

    2014-05-01

    suite of positive examples offered by soil enthusiasts is to provide a common platform appropriate to all parts of the world, with a common consensus on soil issues to be covered and be brought to the table of consumers. The Global Soil Partnership (GSP) is an interactive, responsive and voluntary partnership, open to governments, regional organizations, institutions and other stakeholders. One of the pillars of action aims to "Encourage investment, technical cooperation, policy, education awareness and extension in soil". In order to achieve this goal, a small regionally balanced committee was formed following the 3rd European Network on Soil Awareness conference in Aberdeen and the 2nd Global Soil Week in Berlin. This group produced a draft plan of action that will be submitted to the Intergovernmental technical Panel on Soils (ITPS) of the GSP. Some key points that we need to address are: finding new soil communicators to awake and engage the society and the political arena (e.g. actors, poets, artists, etc.); focusing on a harmonised public perception of soil and their importance for environment and society; re-introducing soil science into the school curricula as a cross-cutting discipline designing a coherent but flexible structure and ensuring a proper and logical constructive transition between each learning stage (e.g. training teachers, web-based courses/ web-based platform, etc.). REFERENCES Bouma J, Broll G, Crane TA, Dewitte O, Gardi C, Schulte RPO, Towers W (2012) Soil information in support of policy making and awareness raising. Current Opinion in Environmental Sustainability, 4, 552-558. EC (2006) (COM(2006)231 final) Communication from the Commission to the Council, the European Parliament, the European Economic and Social Committee of the Regions, Thematic Strategy for Soil Protection. (ed Commission E), Brussels, Belgium.

  8. 29 CFR 1918.100 - Emergency action plans.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR LONGSHORING General Working Conditions. § 1918.100 Emergency...

  9. The preparation of the National Environmental Action Plan (NEAP ...

    African Journals Online (AJOL)

    In the late 80's, the World Bank got interested in environmental matters, to the point that a tsunami of a new process (National Environmental Action Plans – NEAPs) swept across the African continent. At that time, Madagascar was still under the rule of Didier Ratsiraka, an iron rule which had started in 1975. A place where ...

  10. 49 CFR 659.37 - Corrective action plans.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Corrective action plans. 659.37 Section 659.37 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight...

  11. Town of Canmore Energy Management Action Plan (EMAP)

    International Nuclear Information System (INIS)

    2005-03-01

    In 1999, the Town of Canmore, Alberta joined the Federation of Canadian Municipalities' Partners for Climate Protection (PCP) Program and committed to reducing greenhouse gas (GHG) emissions from municipal operations by 20 per cent and community-wide emissions by 6 per cent of 2000 levels by 2012. To date, the City has completed a baseline analysis for municipal operations and the community. It has also initiated an Energy Management Action Plan (EMAP) to identify opportunities in sustainable development through energy, GHG and air quality management. The broad community objectives include housing and transportation management, job creation and local economic development. The city has adopted The Natural Step (TNS) framework which defines sustainability and the guiding principles for decision-making. The objectives of EMAP are to define and evaluate options for a practical strategy and action plan to meet the city's GHG reduction targets; raise local awareness of the issues and opportunities of energy planning and GHG reductions and develop a local action plan outlining action items to reduce energy use and GHG emissions from municipal operations throughout the community. This report explained the methodology and framework for EMAP management and presented a community profile for the Town of Canmore. It also included an energy and emissions inventory and forecast with reference to corporate energy and emissions baseline; community energy and emissions baseline; corporate energy and emissions forecast; community energy and emissions forecast and corporate and community GHG targets. refs., tabs., figs

  12. 12 CFR 704.10 - Investment action plan.

    Science.gov (United States)

    2010-01-01

    ... market pricing, cash flows, and risk; (3) How the investment fits into the credit union's asset and... Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS CORPORATE CREDIT UNIONS § 704.10 Investment action plan. (a) Any corporate credit union in possession of an...

  13. Listening to the socially excluded: the European national action plan.

    Science.gov (United States)

    Sinclair, David

    2007-12-01

    Over the past two years, Help the Aged has worked with colleagues across Europe, through the Age network of 160 aging organizations, to help excluded older people feed their views into the European National Action Plans on Social Exclusion; to better understand the barriers faced when consulting older people.

  14. Quantity and quality of written feedback, action plans, and student ...

    African Journals Online (AJOL)

    Background. Mini-clinical-evaluation exercise (mini-CEX) assessment forms that have been modified with the addition of specific spaces on separate sheets are expected to improve the quantity and quality of written feedback and the action plan for further learning which is agreed upon, and to encourage written reflection.

  15. Family Planning - A Priority Social and Health Action Programme for ...

    African Journals Online (AJOL)

    Family Planning - A Priority Social and Health Action Programme for. Africa and the Role of the Physician. Dr. A.A. Arkutu ... cern about che risk - benefit factor while ochers cite che spread of HIV infection as justification for not ... promote health and reduce che high levels of illness and mortality, especially among vulnerable.

  16. IAEA supports regional seas conventions and action plans

    International Nuclear Information System (INIS)

    2000-01-01

    The document informs about the 3rd Global Meeting of Regional Seas Conventions and Action Plans held in Monaco in November 2000 at the IAEA's Marine Environmental Laboratory (IAEA-MEL). The meeting assembled a number of marine environmental experts from several UN bodies to reinforce activities to protect the marine environment

  17. Algeria : National Environmental Action Plan for Sustainable Development

    OpenAIRE

    World Bank

    2002-01-01

    This staff sector assessment note accompanies the recently completed national environmental action plan for sustainable development (NEAP-SD), which, as an output of the Industrial Pollution Control Project in Algeria, focused on charting a new course for environmental management in the country, based on an objective assessment of past policy, and institutional failures, on a new consensus...

  18. Plan of Action | Women in Science | Initiatives | Indian Academy of ...

    Indian Academy of Sciences (India)

    The following is the summary of the discussions that took place in a meeting of the Committee of the Indian Academy of Sciences for 'Women in Science' and action plans that were identified at this meeting: A database of women in sciences at all levels needs to be created. This should be a repository of information for and ...

  19. Evaluation criteria for communications-related corrective action plans

    International Nuclear Information System (INIS)

    1997-02-01

    This document provides guidance and criteria for US Nuclear Regulatory Commission (NRC) personnel to use in evaluating corrective action plans for nuclear power plant communications. The document begins by describing the purpose, scope, and applicability of the evaluation criteria. Next, it presents background information concerning the communication process, root causes of communication errors, and development and implementation of corrective actions. The document then defines specific criteria for evaluating the effectiveness of the corrective action plan, interview protocols, and an observation protocol related to communication processes. This document is intended only as guidance. It is not intended to have the effect of a regulation, and it does not establish any binding requirements or interpretations of NRC regulations

  20. Auditory event files: integrating auditory perception and action planning.

    Science.gov (United States)

    Zmigrod, Sharon; Hommel, Bernhard

    2009-02-01

    The features of perceived objects are processed in distinct neural pathways, which call for mechanisms that integrate the distributed information into coherent representations (the binding problem). Recent studies of sequential effects have demonstrated feature binding not only in perception, but also across (visual) perception and action planning. We investigated whether comparable effects can be obtained in and across auditory perception and action. The results from two experiments revealed effects indicative of spontaneous integration of auditory features (pitch and loudness, pitch and location), as well as evidence for audio-manual stimulus-response integration. Even though integration takes place spontaneously, features related to task-relevant stimulus or response dimensions are more likely to be integrated. Moreover, integration seems to follow a temporal overlap principle, with features coded close in time being more likely to be bound together. Taken altogether, the findings are consistent with the idea of episodic event files integrating perception and action plans.

  1. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 413: Clean Slate II Plutonium Dispersion (TTR) Tonopah Test Range, Nevada. Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States)

    2017-05-01

    This Corrective Action Decision Document/Corrective Action Plan provides the rationale and supporting information for the selection and implementation of corrective actions at Corrective Action Unit (CAU) 413, Clean Slate II Plutonium Dispersion (TTR). CAU 413 is located on the Tonopah Test Range and includes one corrective action site, TA-23-02CS. CAU 413 consists of the release of radionuclides to the surface and shallow subsurface from the Clean Slate II (CSII) storage–transportation test conducted on May 31, 1963. The CSII test was a non-nuclear detonation of a nuclear device located inside a concrete bunker covered with 2 feet of soil. To facilitate site investigation and the evaluation of data quality objectives decisions, the releases at CAU 413 were divided into seven study groups: 1 Undisturbed Areas 2 Disturbed Areas 3 Sedimentation Areas 4 Former Staging Area 5 Buried Debris 6 Potential Source Material 7 Soil Mounds Corrective action investigation (CAI) activities, as set forth in the CAU 413 Corrective Action Investigation Plan, were performed from June 2015 through May 2016. Radionuclides detected in samples collected during the CAI were used to estimate total effective dose using the Construction Worker exposure scenario. Corrective action was required for areas where total effective dose exceeded, or was assumed to exceed, the radiological final action level (FAL) of 25 millirem per year. The results of the CAI and the assumptions made in the data quality objectives resulted in the following conclusions: The FAL is exceeded in surface soil in SG1, Undisturbed Areas; The FAL is assumed to be exceeded in SG5, Buried Debris, where contaminated debris and soil were buried after the CSII test; The FAL is not exceeded at SG2, SG3, SG4, SG6, or SG7. Because the FAL is exceeded at CAU 413, corrective action is required and corrective action alternatives (CAAs) must be evaluated. For CAU 413, three CAAs were evaluated: no further action, clean closure, and

  2. Renewable energy action plan. Policy action plan for promotion of renewable energy in the Czech Republic to 2010

    International Nuclear Information System (INIS)

    1999-08-01

    Energy efficiency and renewable energy production contribute to the three major goals of the national energy policy of the Czech Republic: overall competitiveness, security of supply; and environmental protection. Therefore, the Czech government promotes these two sustainable options. The Energy Policy White Paper, which is being developed at the time of writing (June 1999), will provide the general framework for the future role of energy efficiency and renewable energy in the Czech Republic. However, in addition, it is necessary to develop specific policies. The National Energy Efficiency Study aimed to support the Czech government in the formula tion of energy efficiency and renewable energy policy. The National Energy Efficiency Study has resulted in the following documents: (1) The Renewable Energy Action Plan (this report) addresses renewable energy production. The Energy Efficiency Action Plan focuses on the promotion of energy efficiency in end use (separate report; ECN-C--99-065). These two Action Plans provide policy makers in the Czech government with information on potentials, targets, budgets and recommended policy instruments. The core of the Action Plans is the list of concrete policy actions, ready for implementation; (2) The National Energy Efficiency Study NEES (separate report; ECN-C--99-063). This report is the background document to the two Action Plans. It contains detailed information on options and measures, potentials, barriers and policy instruments for energy efficiency and renewables. The main part is a detailed outline for a new energy efficiency and renewable policy. Also, it includes recommendations for financing schemes to overcome the invest ment constraints in the Czech Republic. Finally, a list of concrete projects is included to support project identification

  3. The world population plan of action and the regional commissions.

    Science.gov (United States)

    1987-01-01

    Since their establishment, the regional commissions of the United Nations have been devoting particular attention to population and development concerns. Each commission with its unique social, demographic, economic and political characteristics, has contributed to the international debate on population issues. The commissions have provided a suitable forum for the discussion of those issues, have established programs and activities to respond to them, and, with growing experience and expertise, have contributed to a better understanding of them. National Governments, international organizations, private groups, and the public in general have benefited from their regional activities. This article deals with the substantive contributions of the regional commissions to the last 2 population conferences, the World Population Conference (Bucharest, 1974), where the World Population Plan of Action was adopted, and the International Conference on Population (Mexico City, 1984), where the experience in applying Plan of Action was assessed and a set recommendations for the further implementation of the Plan adopted.

  4. Technical metaphor of railroad switch and communicative action

    Directory of Open Access Journals (Sweden)

    José Luis Caballero Bono

    2016-02-01

    statements on the status of the human embryo. Taken seriously, the «railroad switch» metaphor allows us to talk about an emergent communicative action in terms of the call experienced by a rational agent as a base for his or her calling an unborn human being.

  5. Predicting Changes in Physical Activity among Adolescents: The Role of Self-Efficacy, Intention, Action Planning and Coping Planning

    Science.gov (United States)

    Araujo-Soares, Vera; McIntyre, Teresa; Sniehotta, Falko F.

    2009-01-01

    This paper aims to test the direct predictors of the theory of planned behaviour (TPB), action planning and coping planning as predictors of changes in physical activity (PA) in 157 adolescents (mean age: 12). TPB measures, the Action Planning and Coping Planning Scales (APCPS) and the International Physical Activity Questionnaires were measured…

  6. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    International Nuclear Information System (INIS)

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the CAU No. 426, which includes the Cactus Spring Waste Trenches, CAS No. RG-08-001-RG-CS. The Cactus Spring Waste Trenches are located at the Tonopah Test Range (TTR) which is part of the Nellis Air Force Range, approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action

  7. Affirmative Action Plans, January 1, 1994--December 31, 1994. Revision

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-16

    This document is the Affirmative Action Plan for January 1, 1994 through December 31, 1994 for the Lawrence Berkeley Laboratory, University of California (``LBL`` or ``the Laboratory.``) This is an official document that will be presented upon request to the Office of Federal Contract Compliance Programs, US Department of Labor. The plan is prepared in accordance with the Executive Order 11246 and 41 CFR Section 60-1 et seq. covering equal employment opportunity and will be updated during the year, if appropriate. Analyses included in this volume as required by government regulations are based on statistical comparisons. All statistical comparisons involve the use of geographic areas and various sources of statistics. The geographic areas and sources of statistics used here are in compliance with the government regulations, as interpreted. The use of any geographic area or statistic does not indicate agreement that the geographic area is the most appropriate or that the statistic is the most relevant. The use of such geographic areas and statistics is intended to have no significance outside the context of this Affirmative Action Plan, although, of course, such statistics and geographic areas will be used in good faith with respect to this Affirmative Action Plan.

  8. An investigation into the relevance of action planning, theory of planned behaviour concepts, and automaticity for fruit intake action control.

    Science.gov (United States)

    de Bruijn, Gert-Jan; Wiedemann, Amelie; Rhodes, Ryan E

    2014-09-01

    In the action control framework, intention-behaviour discordance is studied around public health guidelines. Although this framework has been applied to physical activity behaviours, it has only seen very limited attention regarding fruit intake. The purpose of this study was therefore to investigate distributions and predictors of fruit intake intention-behaviour discordance. Prospective correlational design. Data were obtained from undergraduate students (n = 413) using validated questionnaires. Variables from the theory of planned behaviour, automaticity, and action planning were assessed at baseline, and fruit intake was assessed 2 weeks later. Data were analysed using discriminant function analyses and analyses of variance. The proportion of unsuccessful intenders ranged from 39.2% to 80.8%. There was a larger proportion of fruit intake intenders amongst those who reported strong automatic fruit intake. Action control was predicted by fruit intake automaticity and affective attitudes, but the strongest predictor was perceived behavioural control. No action planning items were related to fruit intake action control. There is considerable asymmetry in the intention-fruit intake relationship. An application of the action control framework may stimulate debate on the applicability of intention-based models at the public health level. What is already known on this subject? Intention is theorized to be a key construct in fruit intake. Studies in the physical activity domain indicate that nearly half of the people with positive intentions fail to subsequently act. What does this study add? The proportion of unsuccessful intenders ranged from 39.2% to 80.8%. Holding positive intentions is not sufficient to consume fruit at suggested public health guidelines. Perceived behavioural control is the most important predictor of fruit intake action control. © 2013 The British Psychological Society.

  9. The Removal Action Work Plan for CPP-603A Basin Facility

    International Nuclear Information System (INIS)

    B. T. Richards

    2006-01-01

    This revised Removal Action Work Plan describes the actions to be taken under the non-time-critical removal action recommended in the Action Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center, as evaluated in the Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center. The regulatory framework outlined in this Removal Action Work Plan has been modified from the description provided in the Engineering Evaluation/Cost Analysis (DOE/NE-ID-11140, Rev. 1, August 2004). The modification affects regulation of sludge removal, treatment, and disposal, but the end state and technical approaches have not changed. Revision of this document had been delayed until the basin sludge was successfully managed. This revision (Rev. 1) has been prepared to provide information that was not previously identified in Rev. 0 to describe the removal, treatment, and disposal of the basin water at the Idaho National Laboratory (INL) CERCLA Disposal Facility evaporation ponds and fill the basins with grout/controlled low strength material (CLSM) was developed. The Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center - conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act - evaluated risks associated with deactivation of the basins and alternatives for addressing those risks. The decision to remove and dispose of the basin water debris not containing uranium grouted in place after the sludge has been removed and managed under the Hazardous Waste Management Act/Resource Conservation and Recovery Act has been documented in the Act Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center

  10. [Health & safety in a steel plant: technical and managerial action].

    Science.gov (United States)

    Fusato, M

    2012-01-01

    The report presents the experience in a steel company to improve the management of issues relating to health and safety of workers. The first part of the work focuses on the description of the interventions made by the company in recent years, which can be divided into technical interventions on production facilities, training and information, organizational activities and specific projects in collaboration with the health service. The second part presents the certification project according to OHSAS 18001, with particular focus on the efforts for a lean management of the documentation required by the management systems and for the automation of internal processes. The last part finally describes in detail the manner in which it was decided to address some issues that significantly affect the factory doctor: the recording and analysis of accidents and medications, management of hazardous substances and personal protective equipment.

  11. Remedial action and waste disposal project: 100-DR-1 remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Calverley, C.

    1996-08-01

    This plan presents the method used to assess the readiness of the 100- DR-1 Remedial Action Project. Remediation of the 100-D sites (located on the Hanford Site) involves the excavation (treatment if applicable) and final disposal of contaminated soil and debris associated with the high-priority waste sites in the 100 Areas

  12. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment

  13. Commonwealth of the Northern Mariana Islands Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.

  14. Buried Waste Integrated Demonstration commercialization actions plans. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Kaupanger, R.M. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Glore, D. [Advanced Sciences, Inc. (United States)

    1994-04-01

    The Buried Waste Integrated Demonstration (BWID) is sponsored by US Department of Energy (DOE) Office of Technology Development. BWID supports the development and demonstration of a suite of technologies that when integrated with commercially available baseline technologies form a comprehensive system for the effective and efficient remediation of buried waste throughout the DOE complex. BWID evaluates, validates, and demonstrates technologies and transfers this information throughout DOE and private industry to support DOE. remediation planning and implementation activities. This report documents commercialization action plans for five technologies with near-term commercialization/ implementation potential as well as provides a status of commercial and academic partners for each technology.

  15. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  16. Empowering the child and caregiver: yellow zone Asthma Action Plan.

    Science.gov (United States)

    Dinakar, Chitra; Portnoy, Jay M

    2014-11-01

    Current guidelines, both national and international, elegantly describe evidence-based measures to attain and maintain long-term control of asthma. These strategies, typically discussed between the provider and patient, are provided in the form of written (or electronic) instructions as part of the green zone of the color-coded Asthma Action Plan. The red zone of the Asthma Action Plan has directives on when to use systemic corticosteroids and seek medical attention. The transition zone between the green zone of good control and the red zone of asthma exacerbation is the yellow zone. This zone guides the patient on self-management of exacerbations outside a medical setting. Unfortunately, the only recommendation currently available to patients per the current asthma guidelines is the repetitive use of reliever bronchodilators. This approach, while providing modest symptom relief, does not reliably prevent progression to the red zone. In this document, we present new, evidence-based, yellow zone intervention options.

  17. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  18. Uranium mill tailings remedial action project real estate management plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  19. Perspectives that Influence Action Plans for Chronic Obstructive Pulmonary Disease

    OpenAIRE

    S Costi; D Brooks; RS Goldstein

    2006-01-01

    BACKGROUND: Prompt treatment of acute exacerbations (AEs) in chronic obstructive pulmonary disease (COPD) improves quality of life and reduces the use of health care resources. Although patient self-management through an individualized action plan (AP) can help with early initiation of therapy, its use is critically dependent on the patient recognizing the features of an exacerbation.OBJECTIVE: To describe COPD patients’ experiences with AEs, as well as health care professionals’ (HCPs’) atti...

  20. Uranium mill tailings remedial action project real estate management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy's (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence

  1. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  2. Education issues in disaster medicine: summary and action plan.

    Science.gov (United States)

    Armour, S J; Bastone, P; Birnbaum, M; Garrett, C; Greenough, P G; Manni, C; Ninomiya, N; Renderos, J; Rottman, S; Sahni, P; Shih, C L; Siegel, D; Younggren, B

    2001-01-01

    Change must begin with education. Theme 8 explored issues that need attention in Disaster Medicine education. Details of the methods used are provided in the introductory paper. The chairs moderated all presentations and produced a summary that was presented to an assembly of all of the delegates. The chairs then presided over a workshop that resulted in the generation of a set of action plans that then were reported to the collective group of all delegates. Main points developed during the presentations and discussion included: (1) formal education, (2) standardized definitions, (3) integration, (4) evaluation of programs and interventions, (5) international cooperation, (6) identifying the psychosocial consequences of disaster, (7) meaningful research, and (8) hazard, impact, risk and vulnerability analysis. Three main components of the action plans were identified as evaluation, research, and education. The action plans recommended that: (1) education on disasters should be formalized, (2) evaluation of education and interventions must be improved, and (3) meaningful research should be promulgated and published for use at multiple levels and that applied research techniques be the subject of future conferences. The one unanimous conclusion was that we need more and better education on the disaster phenomenon, both in its impacts and in our response to them. Such education must be increasingly evidence-based.

  3. Motivations for self-regulation: The clean air action plan

    International Nuclear Information System (INIS)

    Giuliano, Genevieve; Linder, Alison

    2013-01-01

    In the fall of 2006 the Ports of Long Beach and Los Angeles announced the Clean Air Action Plan (CAAP). Its intent was to greatly accelerate emissions reductions from port activities. The CAAP was unprecedented in several ways: it was a voluntary agreement between two competing ports; it was achieved with the cooperation of local, state and federal agencies; it promised large particulate emissions reductions along with continued port growth, and it had a price tag of $2.1 billion. What explains the Ports’ decision to implement the CAAP? We conduct a case study to explore alternative explanations for the CAAP. Using data from interviews, media, and the history of events leading up to the CAAP, we find that the CAAP was a strategic response to social and political pressures that had built up over the previous decade. Its intent was to respond to local concerns and reduce opposition to port growth. The CAAP represents an example of the potential of voluntary efforts to solve environmental problems. - Highlights: • We conduct a case study of self-regulation for emissions reduction at seaports in Southern California. • We examine motivations for implementing the Clean Air Action Plan. • We find that social and political pressures were the main motivators, with regulatory threats a contributing factor. • The Clean Air Action Plan is a powerful example of the potential of voluntary strategies

  4. Northeast Oregon Hatchery Spring Chinook Master Plan, Technical Report 2000.

    Energy Technology Data Exchange (ETDEWEB)

    Ashe, Becky L.; Concannon, Kathleen; Johnson, David B.

    2000-04-01

    conjunct ion with a modified Lookingglass Hatchery. Each alternative was evaluated based on criteria developed for rearing fish for a conservation program. After this review, the Nez Perce Tribe determined the only alternative that meets the needs of the program is the alternative to use new facilities in conjunction with a modified Lookingglass Hatchery. This is the Proposed Alternative. The Proposed Alternative would require: Construction of a new incubation and rearing facility in the Imnaha River and modifications of the existing Gumboot facility to accommodate the Imnaha component of the Lookingglass Hatchery production; Construction of a new incubation and rearing facility in the Lostine River to accommodate the Lostine component of the Lookingglass Hatchery production; and Modifications at Lookingglass Hatchery to accommodate the Upper Grande Ronde and Catherine Creek components of the Lookingglass Hatchery production. After an extensive screening process of potential sites, the Nez Perce Tribe proposes the Marks Ranch site on the Imnaha River and the Lundquist site on the Lostine River for new facilities. Conceptual design and cost estimates of the proposed facilities are contained in this master plan. The proposed facilities on the Imnaha and Lostine rivers would be managed in conjunction with the existing adult collection and juvenile acclimation/release facilities. Because this master plan has evolved into an endeavor undertaken primarily by the Nez Perce Tribe, the focus of the document is on actions within the Imnaha and Lostine watersheds where the Nez Perce Tribe have specific co-management responsibilities. Nevertheless, modifications at Lookingglass Hatchery could make it possible to provide a quality rearing environment for the remainder of the CPP. The Nez Perce Tribe will assist co-managers in further evaluating facility needs and providing other components of the NPPC master planning process to develop a solution for the entire CPP. Although the fish

  5. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    Science.gov (United States)

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  6. Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2004-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the 'Federal Facility Agreement and Consent Order' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions

  7. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    Energy Technology Data Exchange (ETDEWEB)

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort

  8. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment. Volume 2, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs.

  9. Information architecture: Standards adoption and retirement process service action plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The purpose of this Service Action Plan is to announce, as well as provide, a high-level outline of a new Departmental process for the adoption and retirement of information technology standards. This process supports the implementation of a Department of Energy (DOE) Information Architecture. This plan was prepared with the Department of Energy information technology standards customers and stakeholders in mind. The process described in this plan will be serviced primarily by staff from the Office of the Deputy Assistant Secretary for Information Management with assistance from designated program and site Information Technology Standards Points of Contact. We welcome any comments regarding this new Departmental process and encourage the proposal of information technology standards for adoption or retirement.

  10. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  11. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    2011-01-01

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation

  12. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  13. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report

  14. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Wickline, Alfred

    2005-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting corrective action

  15. Technical Work Plan for: Thermodynamic Databases for Chemical Modeling

    International Nuclear Information System (INIS)

    C.F. Jovecolon

    2006-01-01

    The objective of the work scope covered by this Technical Work Plan (TWP) is to correct and improve the Yucca Mountain Project (YMP) thermodynamic databases, to update their documentation, and to ensure reasonable consistency among them. In addition, the work scope will continue to generate database revisions, which are organized and named so as to be transparent to internal and external users and reviewers. Regarding consistency among databases, it is noted that aqueous speciation and mineral solubility data for a given system may differ according to how solubility was determined, and the method used for subsequent retrieval of thermodynamic parameter values from measured data. Of particular concern are the details of the determination of ''infinite dilution'' constants, which involve the use of specific methods for activity coefficient corrections. That is, equilibrium constants developed for a given system for one set of conditions may not be consistent with constants developed for other conditions, depending on the species considered in the chemical reactions and the methods used in the reported studies. Hence, there will be some differences (for example in log K values) between the Pitzer and ''B-dot'' database parameters for the same reactions or species

  16. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  17. Technical Work Plan for: Thermodynamic Database for Chemical Modeling

    Energy Technology Data Exchange (ETDEWEB)

    C.F. Jovecolon

    2006-09-07

    The objective of the work scope covered by this Technical Work Plan (TWP) is to correct and improve the Yucca Mountain Project (YMP) thermodynamic databases, to update their documentation, and to ensure reasonable consistency among them. In addition, the work scope will continue to generate database revisions, which are organized and named so as to be transparent to internal and external users and reviewers. Regarding consistency among databases, it is noted that aqueous speciation and mineral solubility data for a given system may differ according to how solubility was determined, and the method used for subsequent retrieval of thermodynamic parameter values from measured data. Of particular concern are the details of the determination of ''infinite dilution'' constants, which involve the use of specific methods for activity coefficient corrections. That is, equilibrium constants developed for a given system for one set of conditions may not be consistent with constants developed for other conditions, depending on the species considered in the chemical reactions and the methods used in the reported studies. Hence, there will be some differences (for example in log K values) between the Pitzer and ''B-dot'' database parameters for the same reactions or species.

  18. UMTRA technical assistance contractor Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    Pehrson, P.

    1993-01-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation

  19. Limbic Interference During Social Action Planning in Schizophrenia.

    Science.gov (United States)

    Stegmayer, Katharina; Bohlhalter, Stephan; Vanbellingen, Tim; Federspiel, Andrea; Wiest, Roland; Müri, René M; Strik, Werner; Walther, Sebastian

    2018-02-15

    Schizophrenia is characterized by social interaction deficits contributing to poor functional outcome. Hand gesture use is particularly impaired, linked to frontal lobe dysfunction and frontal grey matter deficits. The functional neural correlates of impaired gesturing are currently unclear. We therefore investigated aberrant brain activity during impaired gesturing in schizophrenia. We included 22 patients with schizophrenia and 25 healthy control participants matched for age, gender, and education level. We obtained functional magnetic resonance imaging data using an event-related paradigm to assess brain activation during gesture planning and execution. Group differences in whole brain effects were calculated using factorial designs. Gesture ratings were performed by a single rater, blind to diagnoses and clinical presentation. During gesture planning and execution both groups activated brain areas of the praxis network. However, patients had reduced dorsolateral prefrontal cortex (DLPFC) and increased inferior parietal lobe (IPL) activity. Performance accuracy was associated with IPL activity in patients. Furthermore, patients activated temporal poles, amygdala and hippocampus during gesture planning, which was associated with delusion severity. Finally, patients demonstrated increased dorsomedial prefrontal cortex activity during planning of novel gestures. We demonstrate less prefrontal, but more IPL and limbic activity during gesturing in schizophrenia. IPL activity was associated with performance accuracy, whereas limbic activity was linked to delusion severity. These findings may reflect impaired social action planning and a limbic interference with gestures in schizophrenia contributing to poor gesture performance and consequently poor social functioning in schizophrenia.

  20. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment plan

    International Nuclear Information System (INIS)

    April, J.G.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Plastino, J.C.; Roeck, F.V.; Tuttle, B.G.

    1997-04-01

    This Readiness Assessment Plan presents the methodology used to assess the readiness of the 300-FF-1 Remedial Action Project. Remediation involves the excavation, treatment if applicable, and final disposal of contaminated soil and debris associated with the waste sites in the 300-FF-1 Operable Unit. The scope of the 300-FF-1 remediation is to excavate, transport, and dispose of contaminated solid from sites identified in the 300-FF-1 Operable Unit

  1. A climate action plan for the province of New Brunswick

    International Nuclear Information System (INIS)

    2007-04-01

    The Conservation Council of New Brunswick has proposed an action plan for climate change that would enable the province to reduce its greenhouse gas emissions to 10 per cent below 1990 levels by 2020. The objective of the plan also involved eliminating the use of oil, coal and Orimulsion for power generation in New Brunswick. This report presented the proposed action plan. It discussed the growth in greenhouse gas (GHG) emissions in New Brunswick and main sources of carbon pollution. Strategies to stop global warming and the projected impacts of climate change were also presented. Provincial targets for pollution reduction were also identified. The paper also made several recommendations on opportunities for emissions reduction in New Brunswick. These included phasing out electricity exports by the Coleson Cove, Belledune and Dalhousie power plants; retrofitting housing and commercial/institutional building stock, combined with a comprehensive phase out strategy for electric heating; and, mixing renewable power, distributed natural gas cogeneration and green heat combined with the refurbishment of building stock. It was concluded that the long-term benefits of implementing regulatory and financial measures now will be felt as increased efficiency across the economy, employment and business opportunities in every community. 2 tabs., 1 fig

  2. Workshop on the preparation of climate change action plans. Workshop summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-24

    Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.

  3. [Diffusing information to promote population policies based on N'Djamena's Plan of Action].

    Science.gov (United States)

    Gueye, M

    1990-03-01

    From November 28-30, 1989, the Centre D'Etudes et de Recherche sur la Population pour le Developpement (CERPOD) sponsored the Selingue Retreat (SR), outside of Bamako, Mali to discuss the role of population policy development among the 9 Sahelian countries following the adoption of the N'Djamena Program of Action (PAN) the year before. The key questions discussed were: 1) state of the art regarding implementation of population policy development among Sahelian countries; 2) strategies of technical assistance to support CERPOD for population policy development; 3) organizational matters; and 4) evaluation strategies to evaluate population policy development and CERPOD's programs. The SR recommended that due to the lack of an adequate information base for population policy development that collaboration continue between CERPOD and the Futures Group. The new project will begin with a detailed plan of action for Mali and Guinee-Bissau, followed by Niger and Burkina Faso.

  4. Sophistic Ethics in the Technical Writing Classroom: Teaching "Nomos," Deliberation, and Action.

    Science.gov (United States)

    Scott, J. Blake

    1995-01-01

    Claims that teaching ethics is particularly important to technical writing. Outlines a classical, sophistic approach to ethics based on the theories and pedagogies of Protagoras, Gorgias, and Isocrates, which emphasizes the Greek concept of "nomos," internal and external deliberation, and responsible action. Discusses problems and…

  5. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-02-20

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  6. Proceedings of the Radon national action plan workshop

    International Nuclear Information System (INIS)

    Chevet, Pierre-Franck; Godet, Jean-Luc; Tirmarche, Margot; Strand, Per; Mrdakovic Popic, Jelena; Dysvik, Solveig; Skjold, Anne Marit; Vallet, Benoit; Van Deventer, Emilie; Colgan, Tony; ); Mundigl, Stefan; ); Magnusson, S.; Long, Bill; McBurney, Ruth; Thompson, P.A; Pollard, David; Fenton, David; Long, Stephanie; Dehandschutter, Boris; Murith, Christophe; Skeppstroem, Kirlna; Petrova, Karla; Davidkova, Jana; Pravdova, Eva; Kiselev, Sergey; Mc Coll, Neil; Vallet, Jeremie; Rannou, Alain; Kurttio, Paivi; Martinsen, Finn; Roulet, Claude-Alain; Goyette, Joelle; Frutos, Borja; Olaya, Manuel; Linares Alemparte, Pilar; Marinko, Janez; Garcia-Talavera, Marta; Pedrazzi, Lisa; Mc Laughlin, James; Gutierrez-Villanueva, Jose-Luis; Janssens, Augustin

    2015-01-01

    Following the publication of the new European Basic Safety Standards Directive (the Council Directive 2013/59/EURATOM ), published in January 2014, Member States of the European Union have 4 years to incorporate it and to prepare or update their strategy for reducing radon concentration and the associated national radon action plan. Under a joint initiative from ASN and NRPA, 20 European countries, represented by authorities in charge of Radiation Protection, Health, Labour and Housing and Landscaping were brought together during a workshop on national radon action plans. The objective of the workshop, held in ASN's premises, was to share the views and experiences concerning national strategies for reducing radon exposure of the population and associated lung cancer risk. The radon workshop was supported by the World Health Organisation (WHO), the International Atomic Energy Agency (IAEA), the Heads of European Radiation protection Control Authorities (HERCA) and the European Commission (EC). Authorities from USA (EPA, CRCPD), Canada (CNSC) and Russia (FMBA) and the European Radon Association (ERA) also participated in the workshop. This radon workshop has offered the opportunity to compare the actions in place or in preparation in different countries aiming at reducing radon exposure in home and dwellings, in buildings with public access (i.e. schools) and in workplaces. Preventive and corrective solutions, associated with incentives and communication to increase the public awareness, as well as education and training actions for different actors concerned, have been presented and discussed. The question about the relative place of regulation in the national strategy has been considered as an important key point. This document brings together the presentations (slides) given at the workshop. The main conclusions of the workshop are presented at the end of the document

  7. 24 CFR 968.315 - Comprehensive Plan (including five-year action plan).

    Science.gov (United States)

    2010-04-01

    ... analysis, Five-Year Action Plan, and Annual Statement. If necessary, the PHA shall develop and implement... the provision of or coordination of public services, or the consolidation or coordination of drug...): (1) The management, financial, and accounting control systems of the PHA; (2) The adequacy and...

  8. Emergency team and action plan; Brigada de emergencia y plan de accion de emergencia

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez Gorgerino, Ruben Dario [Central Hidroelectrica Itaipu, Hernandarias (Paraguay)]. E-mail: jimenez@itaipu.gov.br

    1998-07-01

    This work reports the various activities developed by a commission designated for the investigation of the fire occurred in the excitation panel of the generator unit 16, for the execution of two tasks: short term creation of plant emergency team, and a long term implementation of emergency action plan.

  9. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  10. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  11. Implementation of a National Trauma Research Action Plan (NTRAP).

    Science.gov (United States)

    Bulger, Eileen M; Rasmussen, Todd E; Jurkovich, Gregory J; Fabian, Timothy C; Kozar, Rosemary A; Coimbra, Raul; Costantini, Todd W; Ficke, James; Malhotra, Ajai K; Price, Michelle A; Smith, Sharon L; Cioffi, William G; Stewart, Ronald M

    2018-01-24

    Traumatic injury is a significant public health problem and the leading cause of death under age 44 in the United States. Federal investment in research funding is needed to address this issue and minimize death and disability. This report seeks to lay out a strategy for the development and implementation of a National Trauma Research Action Plan as described in the 2016 report by the National Academies of Sciences, Engineering, and Medicine (NASEM) entitled, Integrating Military and Civilian Trauma Systems to Achieve Zero Preventable Deaths after Injury.

  12. [Strategic planning: an important economic action for German hospitals].

    Science.gov (United States)

    Wiese, Christoph H R; Zink, Wolfgang; Russo, Sebastian G

    2011-11-01

    In medical systems, economic issues and means of action are in the course of dwindling human (physicians and nurses) and financial resources are more important. For this reason, physicians must understand basic economic principles. Only in this way, there may be medical autonomy from social systems and hospital administrators. The current work is an approach to present a model for strategic planning of an anesthesia department. For this, a "strengths", "weaknesses", "opportunities", and "threats" (SWOT) analysis is used. This display is an example of an exemplary anaesthetic department. © Georg Thieme Verlag Stuttgart · New York.

  13. Hanford Remedial Action Environmental Impact Statement, Richland, Washington. Implementation Plan

    International Nuclear Information System (INIS)

    1995-06-01

    This implementation plan was prepared in compliance in compliance with 10 CFR 1021. It includes the following sections: introduction; purpose and need for departmental action; scope, content, and alternatives for the HRA EIS; public participation process; schedule for preparation of the HRA EIS; anticipated environmental reviews and consultations; and contractor disclosure statement. The following appendices are also included: notice of intent, federal register notice for extension of public scoping period, proposed annotated outline for the draft HRA EIS, summary of final report for the Hanford Future Site Uses Working Group, and summary of comments and responses from the public scoping process

  14. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  15. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  16. Building the Strategic Action Plan of the Vietnam Atomic Energy Institute during 2014-2019

    International Nuclear Information System (INIS)

    Hoang Sy Than; Tran Chi Thanh; Nguyen Hao Quang; Nguyen Nhi Dien; Nguyen Viet Hung; Tran Ngoc Toan; Mai Dinh Trung

    2015-01-01

    In the Decisions by the Prime Minister in the Strategy on Peaceful Utilization of Atomic Energy up to 2020, Vietnam Atomic Energy Institute (VINATOM) was assigned as the Technical Support Organization of the nuclear power projects; and as a key role-player in the decision-making process and in building the national nuclear power infrastructure. Therefore, Building the Strategic Action Plan (SAP) is necessary when VINATOM in present is facing several challenges of varying importance. This report will show the SAP of VINATOM during 2014-2019. The goal of SAP is to develop VINATOM up to the regional advanced level in the field of atomic energy application, such as radiation application, nuclear power and train human resources. The plan of Organizational development, Implementation roadmap and Implementation Solutions of SAP is presented in this report. (author)

  17. Levels of satisfaction and preferences handball players in technical and tactical actions by play category

    Directory of Open Access Journals (Sweden)

    A. García-Angulo

    2015-01-01

    Full Text Available The aims of this study are: a know the level of satisfaction that the young handball player has to perform various technical and tactical actions, by play category; b Meet the technical-tactical actions that the player prefers to perform during games and trainings, by play category; c find out how much like to play offense and defense to the handball players, by play category; d Analyze the type of action play they prefer shares by play category; e know the numbers game situations preferred in each play category. For that purpose a selective study was developed in U-14 and U-16 categories, both male and female, who participated in the Championship of Spain Handball by territorial selections in 2012. We used like instrument “Preferences and Satisfaction Questionnaire in handball players”. The most significant results showed that: a the action that players most like to execute is the shot, both U14 and U16; b players prefer to be on offense than defense; c players perceive that they like their coaches is to defend; d certain defensive actions receive a high score in terms of preference, this may be due to perception players have about what it is they like their coaches; e U16 prefer to use more complex actions against U12 who prefer more simple actions. These data may be used to facilitate the teaching-learning process of young players and achieve greater satisfaction in practice.

  18. The Action Plan Against Repetitive Work - An Industrial Relation Strategy for Improving the Working Environment

    DEFF Research Database (Denmark)

    Hasle, Peter; Møller, Niels

    2001-01-01

    The Danish Action Plan against Repetitive Work is presented and discussed as a possible new strategy for regulating repetitive work as well as other complicated working environment problems. The article is based on an empirical evaluation ot the Action Plan. The asseessment of the Action Plan...

  19. Evaluating the Impact of Action Plans on Trainee Compliance with Learning Objectives

    Science.gov (United States)

    Aumann, Michael J.

    2013-01-01

    This mixed methods research study evaluated the use of technology-based action plans as a way to help improve compliance with the learning objectives of an online training event. It explored how the action planning strategy impacted subjects in a treatment group and compared them to subjects in a control group who did not get the action plan. The…

  20. The Action Plan Against Repetitive Work - An Industrial Relation Strategy for Improving the Working Environment

    DEFF Research Database (Denmark)

    Hasle, Peter; Møller, Niels

    2001-01-01

    The Danish Action Plan against Repetitive Work is presented and discussed as a possible new strategy for regulating repetitive work as well as other complicated working environment problems. The article is based on an empirical evaluation ot the Action Plan. The asseessment of the Action Plan ind...... and industrial relation agreements can be used to regulate other working environment problems....

  1. Corrective Action Investigation Plan for Corrective Action Unit 542: Disposal Holes, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Laura Pastor

    2006-01-01

    locate previously unidentified features at CASs 03-20-07, 03-20-09, 03-20-10, 03-20-11, and 06-20-03. (4) Perform field screening. (5) Collect and submit environmental samples for laboratory analysis to determine whether contaminants of concern (COCs) are present. (6) Collect quality control samples for laboratory analyses to evaluate the performance of measurement systems and controls based on the requirements of the data quality indicators. (7) If COCs are present at the surface/near surface (< 15 feet below ground surface), collect additional step-out samples to define the extent of the contamination. (8) If COCs are present in the subsurface (i.e., base of disposal hole), collect additional samples to define the vertical extent of contamination. A conservative use restriction will be used to encompass the lateral extent of subsurface contamination. (9) Stake or flag sample locations in the field, and record coordinates through global positioning systems surveying. (10) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes. This Corrective Action Investigation Plan has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan

  2. Corrective Action Plan for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2000-05-01

    This Corrective Action Plan (CAP) has been prepared for the Roller Coaster RADSAFE Area Corrective Action Unit 407 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved Corrective Action Alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The Constituents of Concern (COCs) identified during the site characterization include plutonium, uranium, and americium. No other COCS were identified. The following closure actions will be implemented under this plan: (1) Remove and dispose of surface soils which are over three times background for the area. Soils identified for removal will be disposed of at an approved disposal facility. Excavated areas will be backfilled with clean borrow soil fi-om a nearby location. (2) An engineered cover will be constructed over the waste disposal pit area where subsurface COCS will remain. (3) Upon completion of the closure and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site. Barbed wire fencing will be installed along the perimeter of this unit. Post closure monitoring will consist of site inspections to determine the condition of the engineered cover. Any identified maintenance and repair requirements will be remedied within 90 working days of discovery and documented in writing at the time of repair. Results of all inspections/repairs for a given year will be addressed in a single report submitted annually to the NDEP.

  3. Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12

  4. Mitigation action plan for remedial action at the Uranium Mill Tailing Sites and Disposal Site, Rifle, Colorado

    International Nuclear Information System (INIS)

    1992-07-01

    The Estes Gulch disposal site is approximately 10 kilometers (6 miles) north of the town of Rifle, off State Highway 13 on Federal land administered by the Bureau of Land Management. The Department of Energy (DOE) will transport the residual radioactive materials (RRM) by truck to the Estes Gulch disposal site via State Highway 13 and place it in a partially below-grade disposal cell. The RRM will be covered by an earthen radon barrier, frost protection layers, and a rock erosion protection layer. A toe ditch and other features will also be constructed to control erosion at the disposal site. After removal of the RRM and disposal at the Estes Gulch site, the disturbed areas at all three sites will be backfilled with clean soils, contoured to facilitate surface drainage, and revegetated. Wetlands areas destroyed at the former Rifle processing sites will be compensated for by the incorporation of now wetlands into the revegetation plan at the New Rifle site. The UMTRA Project Office, supported by the Remedial Action Contractor (RAC) and the Technical Assistance Contractor (TAC), oversees the implementation of the MAP. The RAC executes mitigation measures in the field. The TAC provides monitoring of the mitigation actions in cases where mitigation measures are associated with design features. Site closeout and inspection compliance will be documented in the site completion report

  5. Mitigation action plan for remedial action at the Uranium Mill Tailing Sites and Disposal Site, Rifle, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    The Estes Gulch disposal site is approximately 10 kilometers (6 miles) north of the town of Rifle, off State Highway 13 on Federal land administered by the Bureau of Land Management. The Department of Energy (DOE) will transport the residual radioactive materials (RRM) by truck to the Estes Gulch disposal site via State Highway 13 and place it in a partially below-grade disposal cell. The RRM will be covered by an earthen radon barrier, frost protection layers, and a rock erosion protection layer. A toe ditch and other features will also be constructed to control erosion at the disposal site. After removal of the RRM and disposal at the Estes Gulch site, the disturbed areas at all three sites will be backfilled with clean soils, contoured to facilitate surface drainage, and revegetated. Wetlands areas destroyed at the former Rifle processing sites will be compensated for by the incorporation of now wetlands into the revegetation plan at the New Rifle site. The UMTRA Project Office, supported by the Remedial Action Contractor (RAC) and the Technical Assistance Contractor (TAC), oversees the implementation of the MAP. The RAC executes mitigation measures in the field. The TAC provides monitoring of the mitigation actions in cases where mitigation measures are associated with design features. Site closeout and inspection compliance will be documented in the site completion report.

  6. DOUBLE TRACKS Test Site interim corrective action plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarily of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.

  7. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    Energy Technology Data Exchange (ETDEWEB)

    D. Vandel

    2003-09-01

    This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

  8. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    Science.gov (United States)

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  9. Corrective Action Investigation Plan for Corrective Action Unit 447: Project Shoal Area, Nevada Subsurface Site

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    1998-11-01

    This Corrective Action Investigation Plan (CAIP) describes the US Department of Energy's (DOE's) continued environmental investigation of the subsurface Project Shoal Area (PSA) Corrective Action Unit (CAU) 447. The PSA is located in the Sand Springs Mountains in Churchill County, Nevada, about 48 kilometers (km) (30 miles [mi]) southeast of Fallon, Nevada. Project Shoal was part of the Vela Uniform Program which was conducted to improve the US' ability to detect, identify, and locate underground nuclear detonations. The test consisted of detonating a 12-kiloton nuclear device deep underground in granitic rock to determine whether seismic waves produced by an underground nuclear test could be differentiated from seismic waves produced by a naturally occurring earthquake. The test was a joint effort conducted by the US Atomic Energy Commission (AEC) and the US Department of Defense (DoD) in October 1963 (AEC, 1964).

  10. North Slope (Wahluke Slope) expedited response action cleanup plan

    International Nuclear Information System (INIS)

    1994-02-01

    The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi 2 (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives

  11. North Slope (Wahluke Slope) expedited response action cleanup plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.

  12. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  13. An investigation of dematerialization planning options at tourism destinations: Technical and behavioural dimensions

    OpenAIRE

    Kelly, Joseph

    2006-01-01

    The goal of this dissertation is to develop a conceptual framework and associated methods for evaluating alternative tourism planning strategies in terms of dematerialization and acceptability amongst tourists. Its objectives are to (1) examine the technical potential of dematerialization planning options in tourism destinations, (2) investigate tourist perspectives concerning destination planning alternatives that promote dematerialization, (3) assess the travel market responses and demateri...

  14. 75 FR 27341 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Science.gov (United States)

    2010-05-14

    ... resources and demand resources (DR, DG, and storage) in planning software. Additional issues to be discussed... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference To Discuss Increasing Market and Planning Efficiency Through Improved Software May 7, 2010. Take notice that Commission...

  15. Development of an Updated Strategic Marketing Plan for Fox Valley Technical College.

    Science.gov (United States)

    May, Susan A.

    This project was conducted to develop a comprehensive strategic marketing plan for Fox Valley Technical College (FVTC). Components included a review of the literature, establishing criteria for the plan, validation of the criteria, the actual development of the plan involving a formative committee, and the review of institutional marketing plans…

  16. Can persuasive messages encourage individuals to create action plans for physical activity?

    Science.gov (United States)

    Sweet, Shane N; Brawley, Lawrence R; Hatchell, Alexandra; Gainforth, Heather L; Latimer-Cheung, Amy E

    2014-08-01

    Given the positive influence of action planning on physical activity, persuasive messages could be designed to promote action planning. The purpose of this paper was to test action planning messages in two studies. Participants were allocated to one of two message groups, reading either a physical activity only or physical activity plus action planning message (Study 1) and either a gain-framed or loss-framed action planning message (Study 2). The percent of individuals who created an action plan and the quality of the plans were evaluated. In Study 1, individuals in the physical activity plus action planning group created as many action plans as the physical activity only group, but their plans were higher quality. In Study 2, Week 2 differences between the gain- and loss-framed message groups were found for action planning. To our knowledge, these studies were the first to investigate message-induced action planning as a behavior. More research is needed to optimize these messages.

  17. The integrated rangeland fire management strategy actionable science plan

    Science.gov (United States)

    Aldridge, Cameron L.; Berg, Ken; Boyd, Chad S.; Boyte, Stephen P.; Bradford, John B.; Brunson, Ed; Cissel, John H.; Conway, Courtney J.; Chalfoun, Anna D.; Chambers, Jeanne C.; Clark, Patrick; Coates, Peter S.; Crist, Michele R.; Davis, Dawn M.; DeCrappeo, Nicole; Deibert, Patricia A.; Doherty, Kevin E.; Evers, Louisa B.; Finch, Deborah M.; Finn, Sean P.; Germino, Matthew J.; Glenn, Nancy F.; Gucker, Corey; Hall, John A.; Hanser, Steven E.; Havlina, Douglas W.; Heinrichs, Julie; Heller, Matt; Homer, Collin G.; Hunter, Molly E.; Jacobs, Ruth W.; Karl, Jason W.; Kearney, Richard; Kemp, Susan K; Kilkenny, Francis F.; Knick, Steven T.; Launchbaugh, Karen; Manier, Daniel J.; Mayer, Kenneth E.; Meyer, Susan E.; Monroe, Adrian; MontBlanc, Eugénie; Newingham, Beth A.; Pellant, Michael L.; Phillips, Susan L.; Pilliod, David S.; Ricca, Mark A.; Richardson, Bryce A.; Rose, Jeffrey A.; Shaw, Nancy; Sheley, Roger L.; Shinneman, Douglas J.; Wiechman , Lief A.; Wylie, Bruce K.

    2016-01-01

    The Integrated Rangeland Fire Management Strategy (hereafter Strategy, DOI 2015) outlined the need for coordinated, science-based adaptive management to achieve long-term protection, conservation, and restoration of the sagebrush (Artemisia spp.) ecosystem. A key component of this management approach is the identification of knowledge gaps that limit implementation of effective strategies to meet current management challenges. The tasks and actions identified in the Strategy address several broad topics related to management of the sagebrush ecosystem. This science plan is organized around these topics and specifically focuses on fire, invasive plant species and their effects on altering fire regimes, restoration, sagebrush and greater sage-grouse (Centrocercus urophasianus), and climate and weather.

  18. Factors associated to performance efficacy of technical-tactical actions in volleyball

    Directory of Open Access Journals (Sweden)

    William das Neves Salles

    2017-05-01

    Full Text Available DOI: http://dx.doi.org/10.5007/1980-0037.2017v19n1p74   The aim of the study was to investigate the factors associated to performance efficacy of technical-tactical actions in volleyball. Based on the protocol of the Instrument for Technical and Tactical Performance Assessment in Volleyball (IAD-VB, 44.025 match actions performed by male and female athletes from u-15, u-16 and u-17 finalist teams of the 2010 Santa Catarina Volleyball Championship in Brazil were observed. Data were analyzed on SPPS 21 software using the logistic regression technique, adopting 5% significance level for the interpretation of results. Adjusted model explained 51.40% efficacy variance, and the factors associated with this variable were decision making, adjustment, efficiency, and competition level.

  19. World Health Organization Global Disability Action Plan: The Mongolian Perspective

    Directory of Open Access Journals (Sweden)

    Fary Khan

    2017-01-01

    Full Text Available Objective: To provide an update on disability and rehabilitation in Mongolia, and to identify potential barriers and facilitators for implementation of the World Health Organization (WHO Global Disability Action Plan (GDAP. Methods: A 4-member rehabilitation team from the Royal Melbourne Hospital conducted an intensive 6-day workshop at the Mongolian National University of Medical Sciences, for local healthcare professionals (n = 77 from medical rehabilitation facilities (urban/rural, public/private and non-governmental organizations. A modified Delphi method (interactive sessions, consensus agreement identified challenges for rehabilitation service provision and disability education and attitudes, using GDAP objectives. Results: The GDAP summary actions were considered useful for clinicians, policy-makers, government and persons with disabilities. The main challenges identified were: limited knowledge of disability services and rehabilitation within healthcare sectors; lack of coordination between sectors; geo-topographical issues; limited skilled workforces; lack of disability data, guidelines and accreditation standards; poor legislation and political commitment. The facilitators were: strong leadership; advocacy of disability-inclusive development; investment in local infrastructure/human resources; opportunities for coordination and partnerships between the healthcare sector and other stakeholders; research opportunities; and dissemination of information. Conclusion: Disability and rehabilitation is an emerging priority in Mongolia to address the rights and needs of persons with disabilities. The GDAP provides guidance to facilitate access and strengthen rehabilitation services.

  20. Integrated corridor management initiative : demonstration phase evaluation - Dallas technical capability analysis test plan.

    Science.gov (United States)

    This report presents the test plan for conducting the Technical Capability Analysis for the United States : Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor : Management (ICM) Initiative Demonstration. The ...

  1. Integrated corridor management initiative : demonstration phase evaluation, San Diego technical capability analysis test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...

  2. Technical Basis for Radiological Emergency Plan Annex for WTD Emergency Response Plan: West Point Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Hickey, Eva E.; Strom, Daniel J.

    2005-08-01

    Staff of the King County Wastewater Treatment Division (WTD) have concern about the aftermath of a radiological dispersion event (RDE) leading to the introduction of significant quantities of radioactive material into the combined sanitary and storm sewer system in King County, Washington. Radioactive material could come from the use of a radiological dispersion device (RDD). RDDs include "dirty bombs" that are not nuclear detonations but are explosives designed to spread radioactive material (National Council on Radiation Protection and Measurements (NCRP) 2001). Radioactive material also could come from deliberate introduction or dispersion of radioactive material into the environment, including waterways and water supply systems. This document, Volume 3 of PNNL-15163 is the technical basis for the Annex to the West Point Treatment Plant (WPTP) Emergency Response Plan related to responding to a radiological emergency at the WPTP. The plan primarily considers response to radioactive material that has been introduced in the other combined sanitary and storm sewer system from a radiological dispersion device, but is applicable to any accidental or deliberate introduction of materials into the system.

  3. Hydro Tasmania - renewable energy drivers, action and plans

    International Nuclear Information System (INIS)

    Gill, R.; Andrews, H.

    2005-01-01

    In Tasmania, the island state of Australia, the generator, Hydro Tasmania, is pushing technical, environmental and business boundaries in its plans to integrate a relatively high proportion (up to 20 percent) of large wind generators into its current complex mix of large and small hydropower plants. Its plans include projects to increase the efficiency of its older hydropower equipment as it prepares to supply much needed peaking capacity to the market in southern Australia via the groundbreaking Basslink undersea cable, which is due for completion in November 2005. Taken as a package these developments are creating a globally significant reference site for renewable energy systems. The paper will describe what is happening, and more importantly what is underpinning the developments, including: the harnessing of Tasmania's world-class wind resource, where recently constructed 1.75 MW wind turbines are achieving capacity factors of over 45 percent - some of the best productivity in the world today; the application of leading environmental science measures to ensure the sustainability of both the new wind farm developments and the transformation of the hydropower system to meet peak capacity demands; the relevance of the existing large hydropower storages that can operate in synergy with the wind resource; the contribution of Australia's renewable energy certificate scheme, which is effectively doubling the value of new renewable energy developments compared with existing generation sources; the application of the latest technology in hydropower turbines, combined with power system expertise from the world's leading manufacturers, to increase the efficiency of older hydropower generators, thereby more effectively harnessing the existing environmental footprint; and the transformation of Hydro Tasmania's business into a significant supplier and trader of premium value peak energy into the sophisticated Australian National Electricity Market. (author)

  4. Technical Targets - A Tool to Support Strategic Planning in the Subsurface Contaminants Focus Area

    International Nuclear Information System (INIS)

    Looney, B.B.

    2002-01-01

    The Subsurface Contaminants Focus Area (SCFA) is supported by a lead laboratory consisting of technical representatives from DOE laboratories across the country. This broadly representative scientific group has developed and implemented a process to define Technical Targets to assist the SCFA in strategic planning and in managing their environmental research and development portfolio. At an initial meeting in Golden Colorado, an initial set of Technical Targets was identified using a rapid consensus based technical triage process. Thirteen Technical Targets were identified and described. Vital scientific and technical objectives were generated for each target. The targets generally fall into one of the following five strategic investment categories: Enhancing Environmental Stewardship, Eliminating Contaminant Sources, Isolating Contaminants, Controlling Contaminant Plumes, Enabling DOEs CleanUp Efforts. The resulting targets and the detail they comprise on what is, and what is not, needed to meet Environmental Management needs provide a comprehensive technically-based framework to assist in prioritizing future work and in managing the SCFA program

  5. University of California, Irvine, Student Affirmative Action Five-Year Plan and Planning Process, 1984-1988. Volume II.

    Science.gov (United States)

    Galligani, Dennis J.

    This second volume of the University of California, Irvine (UCI), Student Affirmative Action (SAA) Five-Year Plan contains the complete student affirmative action plans as submitted by 33 academic and administrative units at UCI. The volume is organized by type of unit: academic units, academic retention units, outreach units, and student life…

  6. Smoking Cessation in Cardiac Patients: The Influence of Action Plans, Coping Plans and Self-Efficacy on Quitting Smoking

    Science.gov (United States)

    de Hoog, Natascha; Bolman, Catherine; Berndt, Nadine; Kers, Esther; Mudde, Aart; de Vries, Hein; Lechner, Lilian

    2016-01-01

    Smoking cessation is the most effective action for cardiac patients who smoke to improve their prognosis, yet more than one-half of cardiac patients continue to smoke after hospital admission. This study examined the influence of action plans, coping plans and self-efficacy on intention to quit and smoking cessation in cardiac patients. Cardiac…

  7. Plan d'action pour la conservation des espèces d'oiseaux inscrites ...

    African Journals Online (AJOL)

    This List includes fifteen species of bird, and at the thirteenth Conference of the Parties in Catania, Sicily in November 2003, an Action Plan for the conservation of these species was adopted, following similar plans on monk seal, marine turtles, cetaceans and marine vegetation. The Action Plan for Birds notes initiatives ...

  8. Implementation of the Every Newborn Action Plan: Progress and lessons learned.

    Science.gov (United States)

    Kinney, Mary V; Cocoman, Olive; Dickson, Kim E; Daelmans, Bernadette; Zaka, Nabila; Rhoda, Natasha R; Moxon, Sarah G; Kak, Lily; Lawn, Joy E; Khadka, Neena; Darmstadt, Gary L

    2015-08-01

    Progress in reducing newborn mortality has lagged behind progress in reducing maternal and child deaths. The Every Newborn Action Plan (ENAP) was launched in 2014, with the aim of achieving equitable and high-quality coverage of care for all women and newborns through links with other global and national plans and measurement and accountability frameworks. This article aims to assess country progress and the mechanisms in place to support country implementation of the ENAP. A country tracking tool was developed and piloted in October-December 2014 to collect data on the ENAP-related national milestones and implementation barriers in 18 high-burden countries. Simultaneously, a mapping exercise involving 47 semi-structured interviews with partner organizations was carried out to frame the categories of technical support available in countries to support care at and around the time of birth by health system building blocks. Existing literature and reports were assessed to further supplement analysis of country progress. A total of 15 out of 18 high-burden countries have taken concrete actions to advance newborn health; four have developed specific action plans with an additional six in process and a further three strengthening newborn components within existing plans. Eight high-burden countries have a newborn mortality target, but only three have a stillbirth target. The ENAP implementation in countries is well-supported by UN agencies, particularly UNICEF and WHO, as well as multilateral and bilateral agencies, especially in health workforce training. New financial commitments from development partners and the private sector are substantial but tracking of national funding remains a challenge. For interventions with strong evidence, low levels of coverage persists and health information systems require investment and support to improve quality and quantity of data to guide and track progress. Some of the highest burden countries have established newborn health

  9. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    1999-01-01

    The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document

  10. Rehabilitation in Madagascar: Challenges in implementing the World Health Organization Disability Action Plan.

    Science.gov (United States)

    Khan, Fary; Amatya, Bhasker; Mannan, Hasheem; Burkle, Frederick M; Galea, Mary P

    2015-09-01

    To provide an update on rehabilitation in Madagascar by using local knowledge to outline the potential barriers and facilitators for implementation of the World Health Organization (WHO) Disability Action Plan (DAP). A 14-day extensive workshop programme (September-October 2014) was held at the University Hospital Antananarivo and Antsirabe, with the Department of Health Madagascar, by rehabilitation staff from Royal Melbourne Hospital, Australia. Attendees were rehabilitation professionals (n=29) from 3 main rehabilitation facilities in Madagascar, who identified various challenges faced in service provision, education and attitudes/approaches to people with disabilities. Their responses and suggested barriers/facilitators were recorded following consensus agreement, using objectives listed in the DAP. The barriers and facilitators outlined by participants in implementing the DAP objectives include: engagement of health professionals and institutions using a multi-sectoral approach, new partnerships, strategic collaboration, provision of technical assistance, future policy directions, and research and development. Other challenges for many basic policies included: access to rehabilitation services, geographical coverage, shortage of skilled work-force, limited info-technology systems; lack of care-models and facility/staff accreditation standards; limited health services infrastructure and "disconnect" between acute and community-based rehabilitation. The DAP summary actions were useful planning tools to improve access, strengthen rehabilitation services and community-based rehabilitation, and collate data for outcome research.

  11. Pedagogical action by Physical Education teachers from Rio Grande do Sul Federal Technical Schools

    Directory of Open Access Journals (Sweden)

    Edson Souza de Azevedo

    2008-06-01

    Full Text Available The aim of this study is to describe the pedagogical action taken by Physical Education teachers (n=41 from Rio Grande do Sul Federal Technical High Shools (n=12, contextualizing the pedagogical approaches which guide the pedagogical action. The study was an exploratory descriptive one which analyzed the circumstances of the classes and the teachers’actions. The profile presented by teachers shows the interaction of formative, recreational, sportive conceptions. Daily, activities practiced in schools are mostly related to recreational and sportive games, gymnastics and walks. The pedagogical approaches adopted by teachers are the physical activity approach and the humanist approach. As a conclusion, teachers’pedagogical practice is focused on Physical Education teachers’s valorization as a school curricular content and search for changing their practice in qualified healthy activities.

  12. Strategic planning and action on climate change: A guide for Canadian mining companies

    International Nuclear Information System (INIS)

    2000-01-01

    This Guide has been developed by the Pembina Institute for Appropriate Development of Drayton Valley, Alberta and Stratos Inc., of Ottawa, as a project for the Mining Association of Canada, in an effort to assist senior executives in the Canadian mining industry in developing corporate strategic responses to the risks and opportunities associated with climate change and sustainable development. Section One of the Guide provides an introduction to the scientific, political and legal issues involved in climate change. Section Two outlines the implications of this issue for Canadian mining companies. Section Three and Four provide senior managers with a strategic framework to help understand the scope of a comprehensive response and assist them in developing and integrating climate change policies into their overall corporate strategy and business plan. Section Five outlines the major components of a generic climate change strategy and action plan, while Section Six looks at specific technical opportunity areas where mining companies can reduce greenhouse gas emissions. Section Seven focuses on business opportunities related to greenhouse gas emission reductions that can be implemented domestically or internationally outside of Canadian mining operations. Section Eight concludes the Guide with a comprehensive list of references and additional sources of information to assist users in follow-up and implementation. The accompanying companion handbook, entitled 'Guide to inventorying, measuring and reporting on climate change actions for MAC member companies' is designed to be used by energy managers and technical support staff who are responsible for implementing greenhouse gas measurement reporting systems. In addition to the Guide, the Mining Association and the Pembina Institute also developed three versions of a climate change strategy workshop designed for mining company personnel at different levels and different responsibilities. These workshops can also be

  13. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2009-04-03

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

  14. Nuclear energy and global governance to 2030 : an action plan

    Energy Technology Data Exchange (ETDEWEB)

    Frechette, L.; Findlay, T. (comps.); Brem, M.; Hanson, J.; Bunch, M.; McCausland, T. (eds.)

    2010-07-01

    This document presented the key findings of the Nuclear Energy Futures project that was initiated in May 2006 to consider global governance of nuclear energy. The five-point action plan presented in this document included: (1) nuclear safety whereby all nuclear states are committed to and capable of implementing the highest nuclear safety standards, (2) nuclear security whereby all nuclear material and facilities are secure from unauthorized access or terrorist seizure or attack, (3) nuclear nonproliferation whereby a nuclear revival does not contribute to the proliferation of nuclear weapons, (4) the re-enforcement of the International Atomic Energy Agency's centrality through increased funding, modernization and reform, and (5) stakeholder involvement whereby all partners, especially industry, participate in judiciously managing a nuclear revival. This document suggested that despite some powerful drivers, the revival of nuclear energy faces too many barriers compared to other means of electricity production. These barriers include high costs; fewer subsidies; too slow for meeting the threat of climate change; inadequate power grids; unresolved nuclear waste issue; and fears about safety, security and nuclear weapons.

  15. LEAP: local environmental action plan. Municipality of Sopishte

    International Nuclear Information System (INIS)

    2004-01-01

    The establishment of the Municipality of Sopishte was preceded by the development of a kind of suburban settlement of Skopje, basically composed of illegally constructed individual houses for living. As a result from economic activities in the Municipality and the impacts from human factor, there are problems related to the disturbance of the quality of the basic environmental quality factors (water, air and soil), as well as threat to biological diversity and natural values and rarities. The Municipality of Sopishte is situated in hilly-mountain area. Significant sources of air pollution have not been recorded (in terms of industrial facilities) caused by the household neglectible air pollution caused by traffic. The Municipality is very poor in water resources. Almost 90% of the Municipality's territory are without river or stream. A potential source of water supply in this area is the river of Patishka, which is currently not used for water supply purposes. The solid waste, generated basically by the households, is not properly disposed (most frequently dumped on illegal dumping sites on the territory of the Municipality) and represents a serious problem making impacts on the quality of the environment. On the basis of the evaluation of identified environmental problems, priority activities required to be undertaken in short and medium term have been set up. Financial constrains have been taken into account in this regard. The proposed Action Plan reflects the observed needs of the population of the Municipality of Sopishte and the perception of the key problems

  16. Nuclear energy and global governance to 2030 : an action plan

    International Nuclear Information System (INIS)

    Frechette, L.; Findlay, T.; Brem, M.; Hanson, J.; Bunch, M.; McCausland, T.

    2010-01-01

    This document presented the key findings of the Nuclear Energy Futures project that was initiated in May 2006 to consider global governance of nuclear energy. The five-point action plan presented in this document included: (1) nuclear safety whereby all nuclear states are committed to and capable of implementing the highest nuclear safety standards, (2) nuclear security whereby all nuclear material and facilities are secure from unauthorized access or terrorist seizure or attack, (3) nuclear nonproliferation whereby a nuclear revival does not contribute to the proliferation of nuclear weapons, (4) the re-enforcement of the International Atomic Energy Agency's centrality through increased funding, modernization and reform, and (5) stakeholder involvement whereby all partners, especially industry, participate in judiciously managing a nuclear revival. This document suggested that despite some powerful drivers, the revival of nuclear energy faces too many barriers compared to other means of electricity production. These barriers include high costs; fewer subsidies; too slow for meeting the threat of climate change; inadequate power grids; unresolved nuclear waste issue; and fears about safety, security and nuclear weapons.

  17. Technical assistance to Department of Energy/Office of Operational Safety Assurance Program for remedial action

    International Nuclear Information System (INIS)

    Denham, D.H.; Cross, F.T.; Kennedy, W.E. Jr.; Marks, S.; Soldat, J.K.; Stenner, R.D.

    1986-01-01

    This project was initiated in FY 1984 to provide technical assistance to the Department of Energy (DOE), Office of Operational Safety (OOS) in developing and implementing its Assurance Program for Remedial Action (APRA), i.e., overview of the DOE remedial action programs. During this second year of the project,* the technical assistance included report and procedure reviews, and assistance with conducting the Uranium Mill Tailings Remedial Action Program (UMTRAP) Office (DOE/AL) appraisal. This included participation in preappraisal visits to UMTRAP sites in Canonsburg, Pennsylvania; Grand Junction, Colorado; and Salt Lake City, Utah. Pacific Northwest Laboratory (PNL) also transferred the PNL-developed document review software to the Oak Ridge Associated Universities (ORAU) staff in Grand Junction, Colorado, in anticipation of future document reviews by the ORAU staff. Other accomplishments have included publication of two formal documents and three project reports, preparation and presentation of five topical reports at national and international meetings, two foreign trip reports, and comments on proposed draft standards of the Environmental Protection Agency (40 CFR 193). The project manager has also participated on National Council on Radiation Protection and Measurements (NCRP) and American Society for Testing and Materials (ASTM) subcommittees developing decommissioning standards, as well as International Atomic Energy Agency (IAEA) advisory groups developing environmental monitoring guidelines

  18. Standard review plan for the review of environmental restoration remedial action quality assurance program plans

    International Nuclear Information System (INIS)

    1991-09-01

    This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the participant QAPPs. Use of the standard review plan will (1) help ensure that participant QAPPs contain the information required by DOE/RL-90-28, (2) aid program participant and DOE Field Office, Richland staff is ensuring that the information describing the participant's QAPP is complete, (3) help persons regarding DOE/RL- 90-28 to locate information, and (4) contribute to decreasing the time needed for the review process. In addition, the Standard Review Plan (SRP) ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate compliance of participant quality programs against DOE/RL-90-28

  19. Climate change and landscape evolution in Provence-Alpes-Cote d'Azur. Volume 1 - Phase 1: identification of large landscape settings; Volume 2 - Phase 2: Hypotheses for climate change in the Provence-Alpes-Cote d'Azur region; Phase 3: Predictable effects of climate change on emblematic landscapes and action plan (technical sheets)

    International Nuclear Information System (INIS)

    2015-08-01

    The main objective of this study is to give an insight on possible effects climate change may have on landscapes of the Provence-Alpes-Cote d'Azur region on the medium and long term according to current hypotheses regarding global warming for Mediterranean regions. A first phase aimed at identifying the main landscape settings of the region. This comprised a definition of the notion of landscape, a discussion of landscape definitions with respect to a regional scale, a framework for the definition of the main landscape settings, an identification of these landscape settings and their characterisation according to a set of criteria and parameters. The second phase aimed at giving an overview of hypotheses regarding climate change. The authors discuss various issues and knowledge about the world climate, available climate models and their uncertainties, and climatic predictions for the region. The third phase aimed at assessing predictable effects of climate change on emblematic landscapes and at defining actions plans. The different components of these action plans are then discussed for the identified landscapes for which the landscape context and challenges are described, and potential actors are indicated. These different phases are first presented, and more detailed reports are provided for each of them, notably with detailed reports and sheets for each landscape setting

  20. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  1. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  2. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2007-04-01

    systems for Buildings 6-605, 6-606, and 6-607, which consists of septic tanks, sumps, piping, floor drains, drain trenches, cleanouts, and a concrete foundation. Additional details of the site history are provided in the CAU 543 Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2004a), and the CAU 543 Corrective Action Decision Document (CADD) (NNSA/NSO, 2005).

  3. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    6-605, 6-606, and 6-607, which consists of septic tanks, sumps, piping, floor drains, drain trenches, cleanouts, and a concrete foundation. Additional details of the site history are provided in the CAU 543 Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2004a), and the CAU 543 Corrective Action Decision Document (CADD) (NNSA/NSO, 2005)

  4. Corrective Action Investigation Plan for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5, Tonopah Test Range, Nevada, REVISION 0, march 1999

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    1999-03-26

    The Corrective Action Investigation Plan for Corrective Action Unit 428, Area 3 Septic Waste Systems 1 and 5, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U. S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 428 consists of Corrective Action Sites 03- 05- 002- SW01 and 03- 05- 002- SW05, respectively known as Area 3 Septic Waste System 1 and Septic Waste System 5. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada , Rev. 1 (DOE/ NV, 1998c). The Leachfield Work Plan was developed to streamline investigations at leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 428. A system of leachfields and associated collection systems was used for wastewater disposal at Area 3 of the Tonopah Test Range until a consolidated sewer system was installed in 1990 to replace the discrete septic waste systems. Operations within various buildings at Area 3 generated sanitary and industrial wastewaters potentially contaminated with contaminants of potential concern and disposed of in septic tanks and leachfields. Corrective Action Unit 428 is composed of two leachfield systems in the northern portion of Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include oil/ diesel range total petroleum hydrocarbons, and Resource Conservation

  5. Corrective Action Investigation Plan for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5, Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    ITLV

    1999-01-01

    The Corrective Action Investigation Plan for Corrective Action Unit 428, Area 3 Septic Waste Systems 1 and 5, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U. S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 428 consists of Corrective Action Sites 03- 05- 002- SW01 and 03- 05- 002- SW05, respectively known as Area 3 Septic Waste System 1 and Septic Waste System 5. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada , Rev. 1 (DOE/ NV, 1998c). The Leachfield Work Plan was developed to streamline investigations at leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 428. A system of leachfields and associated collection systems was used for wastewater disposal at Area 3 of the Tonopah Test Range until a consolidated sewer system was installed in 1990 to replace the discrete septic waste systems. Operations within various buildings at Area 3 generated sanitary and industrial wastewaters potentially contaminated with contaminants of potential concern and disposed of in septic tanks and leachfields. Corrective Action Unit 428 is composed of two leachfield systems in the northern portion of Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include oil/ diesel range total petroleum hydrocarbons, and Resource Conservation

  6. Aspects you should consider in your action plan when implementing an improvement strategy

    DEFF Research Database (Denmark)

    Carstensen, Peter; Vinter, Otto

    2017-01-01

    Both ISO/IEC 15504 (SPICE) and ISO/IEC 33014 include a step in their improvement process called: Develop action plan. But which actions should you include, and are you sure that these actions cover all aspects? We have performed a thorough study of the change strategy literature that is the found......Both ISO/IEC 15504 (SPICE) and ISO/IEC 33014 include a step in their improvement process called: Develop action plan. But which actions should you include, and are you sure that these actions cover all aspects? We have performed a thorough study of the change strategy literature...

  7. Technical task plan for Acquire Commercial Technology for Retrieval

    International Nuclear Information System (INIS)

    McDaniel, L.B.

    1995-01-01

    Objective is to determine from industry their best approaches to retrieving waste from the Single Shell Tanks. This task plan describes the first 18 months of work; the task will be further defined as the work progresses. The retrieval is to be demonstrated on tank 241-C-106

  8. Post-earthquake action plan for existing NPP

    International Nuclear Information System (INIS)

    Chandra Basu, Prabir; )

    2011-01-01

    In recent years, a number of nuclear power plants (NPP), mainly in Japan, have been affected by strong earthquakes. In some cases, the measured ground motions have exceeded the design or evaluation bases. There were cases of such earthquake experience in other countries also. The experience from these events shows that operating plants were shut down immediately following the event. In most cases, no significant damage was identified in these nuclear power plant units. Plants remained shut down for extended periods for studies, investigations and evaluations to assess their safety. In a limited number of cases, upgrades were implemented to meet a) New definitions of the design basis, or b) Requirements for beyond design basis earthquakes. The experience of the above events demonstrated the need for formulating the Post-Earthquake Action Plan (PEqAP) covering specific and detailed criteria and procedures for addressing situations where the original seismic design or evaluation bases are exceeded by actual seismic events. In response to this need, IAEA had published, Earthquake Preparedness and Response for Nuclear Power Plants, Safety Report Series No. 66 (SR 66). The seismic safety knowledge and experience of different countries from the earthquakes till 2010 were collected and disseminated through this Safety Report for providing updated guidance for the actions to be taken in preparation for, and following, a felt earthquake at NPPs. The present article highlighted salient features of the SR66. The Great East Japan Earthquake, of magnitude 9.0, on 11 March 2011 generated extreme ground motion and a large tsunami that struck the East Coast of Japan. Several nuclear power plants (NPP) at Tokai Dai-ini, Higashi Dori, Onagawa, and TEPCO's Fukushima Dai-ichi and Dai-ini, were affected. The operating units at these sites were successfully shutdown. However, the large tsunami waves that followed the ground motion challenged the safety systems of four units of Fukushima

  9. Integrated action planning for biodiversity conservation and sustainable use of highland aquatic resources

    DEFF Research Database (Denmark)

    Bunting, Stuart W.; Luo, S.; Cai, K.

    2016-01-01

    The need for enhanced environmental planning and management for highland aquatic resources is described and rationale for integrated action planning presented. Past action planning initiatives for biodiversity conservation and wetland management are reviewed. A reflective account is given...... of integrated action planning from five sites in China, India and Vietnam. Eight planning phases are described encompassing: stakeholder assessment and partner selection; rapport building and agreement on collaboration; integrated biodiversity, ecosystem services, livelihoods and policy assessment; problem...... analysis and target setting; strategic planning; planning and organisation of activities; coordinated implementation and monitoring; evaluation and revised target-setting. The scope and targeting of actions was evaluated using the DPSIR framework and compatibility with biodiversity conservation and socio-economic...

  10. Toward a Theoretical Framework for Understanding the Relationship between Situated Action and Planned Action Models of Behavior in Information Retrieval Contexts: Contributions from Phenomenology.

    Science.gov (United States)

    Ng, Kwong Bor

    2002-01-01

    Discussion of human-computer interaction and planned action focuses on the belief that it is impossible to consider an action without an a priori plan, even according to the phenomenological position taken for granted by the situated action theory. Reports results of a quasi-experiment that focused on plan deviation within an information seeking…

  11. A Strategic Action Plan for Advancing Math and Science Education in New Mexico 2007-2010

    Science.gov (United States)

    New Mexico Public Education Department, 2007

    2007-01-01

    This Strategic Action Plan for Advancing Math and Science Education is an initial outline of strategies, actions, measures of progress, resources needed, timelines, and responsible parties. The Plan focuses on these three main goals: (1) increasing student interest, participation, and achievement in math and science; (2) raising public support and…

  12. HighARCS Integrated Action Planning for the Dakrong District study site, Quang Tri Province, Vietnam

    DEFF Research Database (Denmark)

    Nguyen, Thi Dieu Phuong; Lund, Søren

    This report presents the Integrated action plans elaborated with the stakeholders and the Dakrong District and the methods and procedures used to identify, prioritise & and assess them.......This report presents the Integrated action plans elaborated with the stakeholders and the Dakrong District and the methods and procedures used to identify, prioritise & and assess them....

  13. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  14. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    International Nuclear Information System (INIS)

    Haagenstad, T.

    1999-01-01

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility

  15. Readability, suitability, and characteristics of asthma action plans: examination of factors that may impair understanding.

    Science.gov (United States)

    Yin, H Shonna; Gupta, Ruchi S; Tomopoulos, Suzy; Wolf, Michael S; Mendelsohn, Alan L; Antler, Lauren; Sanchez, Dayana C; Lau, Claudia Hillam; Dreyer, Benard P

    2013-01-01

    Recognition of the complexity of asthma management has led to the development of asthma treatment guidelines that include the recommendation that all pediatric asthma patients receive a written asthma action plan. We assessed the readability, suitability, and characteristics of asthma action plans, elements that contribute to the effectiveness of action plan use, particularly for those with limited literacy. This was a descriptive study of 30 asthma action plans (27 state Department of Health (DOH)-endorsed, 3 national action plans endorsed by 6 states). (1) readability (as assessed by Flesch Reading Ease, Flesch-Kincaid, Gunning Fog, Simple Measure of Gobbledygook, Forcast), (2) suitability (Suitability Assessment of Materials [SAM], adequate: ≥ 0.4; unsuitable: typography (30.0%), learning stimulation/motivation (26.7%), and graphics (13.3%). There were no statistically significant differences between the average grade level or SAM score of state DOH developed action plans and those from or adapted from national organizations. Plans varied with respect to terms used, symptoms included, and recommended actions. Specific improvements in asthma action plans could maximize patient and parent understanding of appropriate asthma management and could particularly benefit individuals with limited literacy skills.

  16. Predictors for adherence to action plans for self-treatment of COPD exacerbations

    NARCIS (Netherlands)

    Lenferink, A; van der Palen, J.; Wang, X; van der Valk, P.; Effing, T

    2016-01-01

    Introduction/Aim: A minority of patients with chronic obstructive pulmonary disease (COPD) derives benefit fromself-management interventions that include action plans for self-treatment of COPD exacerbations. The aimof this studywas to identify predictors for adherence to action plans for

  17. Action planning and position sense in children with Developmental Coordination Disorder

    NARCIS (Netherlands)

    Adams, I.L.; Ferguson, G.D.; Lust, J.M.; Steenbergen, B.; Smits-Engelsman, B.C.M.

    2016-01-01

    The present study examined action planning and position sense in children with Developmental Coordination Disorder (DCD). Participants performed two action planning tasks, the sword task and the bar grasping task, and an active elbow matching task to examine position sense. Thirty children were

  18. 78 FR 23740 - Notice of Availability of a Swine Brucellosis and Pseudorabies Proposed Action Plan

    Science.gov (United States)

    2013-04-22

    ...] Notice of Availability of a Swine Brucellosis and Pseudorabies Proposed Action Plan AGENCY: Animal and... proposed action plan describing a potential new approach to managing swine brucellosis and pseudorabies... brucellosis and pseudorabies available for public review and comment. Comments on the notice were required to...

  19. Corrective Action Investigation Plan for Corrective Action Unit No. 423: Building 03-60 Underground Discharge Point, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    1997-10-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV), the State of Nevada Division of Environmental Protection (NDEP), and the US Department of Defense. The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUS) or Corrective Action Sites (CASs) (FFACO, 1996). As per the FFACO (1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU No. 423, the Building 03-60 Underground Discharge Point (UDP), which is located in Area 3 at the Tonopah Test Range (TTR). The TTR, part of the Nellis Air Force Range, is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada (Figures 1-1 and 1-2). Corrective Action Unit No. 423 is comprised of only one CAS (No. 03-02-002-0308), which includes the Building 03-60 UDP and an associated discharge line extending from Building 03-60 to a point approximately 73 meters (m) (240 feet [ft]) northwest as shown on Figure 1-3.

  20. Implementation of technical and tactical actions qualified athletes in football different roles in gaming areas of the field

    Directory of Open Access Journals (Sweden)

    Karpa I.Y.

    2013-06-01

    Full Text Available The aim of the study is to establish the structure of the technical and tactical actions skilled players with a specific game role and areas of the field. Found that the improvement of the technical and tactical actions must be due to functional responsibilities of the players depending on the game role and the different areas of the playing field. Found that the most involved areas on average during the match falls on the linebackers, and the lowest - in the forwards. The last defenders and midfielders mainly perform the technical and tactical actions in the flanking regions, and the central axis of the players - in the central areas of the field. The obtained data confirmed that modern football is important players perform functional duties in accordance with their roles and areas of the field. Differentiated approach is recommended in the process of improving the technical and tactical training of players.

  1. Building Energy Benchmarking in India: an Action Plan for Advancing the State-of-the-Art

    Energy Technology Data Exchange (ETDEWEB)

    Sarraf, Saket [Centre for Environmental Planning and Technology (CEPT) Univ., Ahmedabad (India); Anand, Shilpi [Centre for Environmental Planning and Technology (CEPT) Univ., Ahmedabad (India); Shukla, Yash [Centre for Environmental Planning and Technology (CEPT) Univ., Ahmedabad (India); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Singh, Reshma [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-06-01

    This document describes an action plan for advancing the state of the art of commercial building energy benchmarking in the Indian context. The document is primarily intended for two audiences: (a) Research and development (R&D) sponsors and researchers can use the action plan to frame, plan, prioritize and scope new energy benchmarking R&D in order to ensure that their research is market relevant; (b) Policy makers and program implementers engaged in the deployment of benchmarking and building efficiency rating programmes can use the action plan for policy formulation and enforcement .

  2. Action and coping planning with regard to dental brushing among Iranian adolescents.

    Science.gov (United States)

    Pakpour, Amir H; Hidarnia, Alireza; Hajizadeh, Ebrahim; Plotnikoff, Ronald C

    2012-01-01

    The aims of this study were two-fold: (i) to examine the validity of the proposed three-factor structure (intention, action-, and coping planning) in an Iranian sample of adolescents, and (ii) to assess the predictive ability of the Theory of Planned Behavior (TPB) measures of action planning and coping planning for dental brushing. Eight hundred adolescents were randomly selected to participate in the study. 90% (721) of adolescents agreed to participate. Perceived behavioral control, action and coping planning scales and a self-report questionnaire related to dental brushing behavior were completed by the adolescents at baseline. One month later (time-point 2), the adolescents were asked to reassess their frequency of dental brushing over the four week period. Data were analyzed by a confirmatory factor analysis (CFA) on an original three-factor structure (intention, action plan, and coping plan). A hierarchical linear regression analysis was also performed. The CFA for the original three-factor structure showed a good fit index (χ(2) = 637.60, degrees of freedom df = 116), goodness-of-fit index (GFI) = 91, and root mean square error of approximation (RMSEA) = 0.079. Adjusting for demographic variables, action- and coping planning together accounted for 7.9% of the variance associated with dental brushing behavior at one month. In conclusion, results suggest that action planning and coping planning are associated with higher frequency in dental brushing among Iranian adolescents.

  3. Twin peaks: An ERP study of action planning and control in coacting individuals

    NARCIS (Netherlands)

    Sebanz, N.; Knoblich, G.K.; Prinz, W.G.; Wascher, E.

    2006-01-01

    Previous studies have shown that perceiving anothers actions activates corresponding representations in an observer's action system. The present study investigated how performing a task with another person affects action planning and control. Reaction times (RTs) and event-related potentials were

  4. Planning-in-Action: An Innovative Approach to Human Development. The Hunger Project.

    Science.gov (United States)

    Community Development Journal, 1991

    1991-01-01

    The Hunger Project in India used a strategic planning-in-action approach that involved (1) reaching a common understanding; (2) creating a strategic intent; (3) choosing social indicators; (4) identifying strategic objectives; (5) empowering leadership; (6) identifying immediate action steps; and (7) sustaining the action. (SK)

  5. Some considerations on the development of individual work plan for teachers of Technical and Vocational Education

    Directory of Open Access Journals (Sweden)

    Carlos Alberto Gato Armas

    2010-03-01

    Full Text Available This article analyzes, from the optics of upgrading Technical and Professional Education chief staff in the province and professors in the Technical Sciences Faculty in the University of Pedagogical Sciencies “Rafael María of Mendive” in Pinar del Río, which can facilitate the elaboration of the plan for teachers’ individual work, so that it facilitates the assessment and performance of the planned activities, and at the same time, propitiating the professional development of the teachers, in each school term.

  6. Corrective action investigation plan: Area 2 Photo Skid 16 Wastewater Pit, Corrective Action Unit 332. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains a detailed description and plan for an environmental investigation of the Area 2 Photo Skid 16 Wastewater Pit. The site is located in Area 2 of the Nevada Test Site. The Photo Skid Wastewater Pit was used for disposal of photochemical process waste, and there is a concern that such disposal may have released photochemicals and metals to the soil beneath the pit and adjacent to it. The purpose of this investigation is to identify the presence and nature of contamination present in and adjacent to the wastewater pit and to determine the appropriate course of environmental response action for the site. The potential courses of action for the site are clean closure through remediation, closure in place (with or without remediation), or no further action.

  7. Effective Data Collection Aids in School Safety Action Planning.

    Science.gov (United States)

    Barnett, Rosemary V.

    2003-01-01

    Recommends six steps school districts should follow to effectively use data collection instruments to improve school safety: Survey each school respondent group, organize a safe schools action team, obtain additional information, conduct a safe schools analysis and develop recommendations, take action. Describes advantages collecting school safety…

  8. 7 CFR 275.16 - Corrective action planning.

    Science.gov (United States)

    2010-01-01

    ... provide responsive service to eligible households. (b) The State agency and project area(s)/management... control reviews and those deficiencies requiring corrective action only at the project area level... project area/management unit corrective action, the State agency and/or project area/management unit shall...

  9. Alternatives/action plan report for outfall 17

    International Nuclear Information System (INIS)

    1994-11-01

    This Document contains information pertaining to alternatives/action associated with controlling ammonia entering through outfall 17. This document identifies the location of contaminate source, the ammonia concentration levels entering East Fork Poplar Creek, and the action taken to reduce/eliminate the toxicity problem

  10. Alternatives/action plan report for outfall 17

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-01

    This Document contains information pertaining to alternatives/action associated with controlling ammonia entering through outfall 17. This document identifies the location of contaminate source, the ammonia concentration levels entering East Fork Poplar Creek, and the action taken to reduce/eliminate the toxicity problem.

  11. Climatic Action Plan Project for the state of Veracruz (Mexico)

    Science.gov (United States)

    Tejeda, A.; Ochoa, C.

    2007-05-01

    With financing of the British Government and support of the National Institute of Ecology, from April of 2006 to March of 2008 an action plan which intends variability effects and climatic change for the state of Veracruz will be made. This plan will be taken to the state government and will be spread out to manufacturers, industrialists and population. Throughout the Gulf of Mexico, the state of Veracruz is a 745 km coast in length with a width that goes from 156 km in the center to 47 km in the north. The state has large mountains, forests, plains, rivers, cascades, lagoons and coasts. Veracruz is the 10th largest state in Mexico with a 72,420 km2 surface, it is located between 17°00' and 22°28' north latitude and between 93°95' and 98°38' west longitude. Because of the orographic effect, the Sierra Madre Oriental causes the existence of many types of climate, from dry to tropical forest, going through snow on the top of the Pico de Orizaba (5747m of altitude). The wind affects the coasts by not allowing to fish during a hundred days a year (particularly in winter), and on summer tropical waves and occasionally hurricanes affect rivers causing overflow and urban floods in fields. These phenomena do not have a regular affectation; they are subject to climate variability effects. Veracruz is the third state with most population in the country (7.1 million people in 2005), only surpassed by the state of Mexico and Mexico City. Although it occupies 3.7% of the national territory, Veracruz has 6.9% of human population in the country, and is the 6th state of PIB national contribution (240 thousands of millions pesos approximately). Of the possible effects of the climatic change the following can be expected: , , : Most of the coasts of the Gulf of Mexico, low and sandy, less of a meter on the sea level, represent the most vulnerable territory of Veracruz. Towns will be affected, the saline water will infiltrate until the phreatic mantles and the coast electrical

  12. Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A...Program Name Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A) DoD Component Air Force Responsible Office Program...present, plan, source, mobilize, deploy, account for, sustain, redeploy and reconstitute forces to conduct National Command Authority authorized

  13. Next Generation Nuclear Plant Methods Technical Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2010-12-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  14. Next Generation Nuclear Plant Methods Technical Program Plan -- PLN-2498

    Energy Technology Data Exchange (ETDEWEB)

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2010-09-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  15. Model Watershed Plan; Lemhi, Pahsimeroi, and East Fork of the Salmon River Management Plan, 1995 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Swift, Ralph

    1995-11-01

    Idaho`s Model Watershed Project was established as part of the Northwest Power Planning Council`s plan for salmon recovery in the Columbia River Basin. The Council`s charge was simply stated and came without strings. The tasks were to identify actions within the watershed that are planned or needed for salmon habitat, and establish a procedure for implementing habitat-improvement measures. The Council gave the responsibility of developing this project to the Idaho Soil Conservation Commission. This Model Watershed Plan is intended to be a dynamic plan that helps address these two tasks. It is not intended to be the final say on either. It is also not meant to establish laws, policies, or regulations for the agencies, groups, or individuals who participated in the plan development.

  16. I plan therefore I choose: Free-choice bias due to prior action-probability but not action-value

    Directory of Open Access Journals (Sweden)

    Lalitta eSuriya-Arunroj

    2015-11-01

    Full Text Available According to an emerging view, decision-making and motor planning are tightly entangled at the level of neural processing. Choice is influenced not only by the values associated with different options, but also biased by other factors. Here we test the hypothesis that preliminary action planning can induce choice biases gradually and independently of objective value when planning overlaps with one of the potential action alternatives. Subjects performed center-out reaches obeying either a clockwise or counterclockwise cue-response rule in two tasks. In the probabilistic task, a pre-cue indicated the probability of each of the two potential rules to become valid. When the subsequent rule cue unambiguously indicated which of the pre-cued rules was actually valid (instructed trials, subjects responded faster to rules pre-cued with higher probability. When subjects were allowed to choose freely between two equally rewarded rules (choice trials they chose the originally more likely rule more often and faster, despite the lack of an objective advantage in selecting this target. In the amount task, the pre-cue indicated the amount of potential reward associated with each rule. Subjects responded faster to rules pre-cued with higher reward amount in instructed trials of the amount task, equivalent to the more likely rule in the probabilistic task. Yet, in contrast, subjects showed hardly any choice bias and no increase in response speed in favor of the original high-reward target in the choice trials of the amount task.We conclude that free-choice behavior is robustly biased when predictability encourages the planning of one of the potential responses, while prior reward expectations without action planning do not induce such strong bias. Our results provide behavioral evidence for distinct contributions of expected value and action planning in decision-making and a tight interdependence of motor planning and action selection, supporting the idea that

  17. Technical architecture of ONC-approved plans for statewide health information exchange.

    Science.gov (United States)

    Barrows, Randolph C; Ezzard, John

    2011-01-01

    ONC-approved state plans for HIE were reviewed for descriptions and depictions of statewide HIE technical architecture. Review was complicated by non-standard organizational elements and technical terminology across state plans. Findings were mapped to industry standard, referenced, and defined HIE architecture descriptions and characteristics. Results are preliminary due to the initial subset of ONC-approved plans available, the rapid pace of new ONC-plan approvals, and continuing advancements in standards and technology of HIE, etc. Review of 28 state plans shows virtually all include a direct messaging component, but for participating entities at state-specific levels of granularity (RHIO, enterprise, organization/provider). About ½ of reviewed plans describe a federated architecture, and ¼ of plans utilize a single-vendor "hybrid-federated" architecture. About 1/3 of states plan to leverage new federal and open exchange technologies (DIRECT, CONNECT, etc.). Only one plan describes a centralized architecture for statewide HIE, but others combine central and federated architectural approaches.

  18. Aspects you should consider in your action plan when implementing an improvement strategy

    DEFF Research Database (Denmark)

    Carstensen, Peter; Vinter, Otto

    2017-01-01

    Both ISO/IEC 15504 (SPICE) and ISO/IEC 33014 include a step in their improvement process called: Develop action plan. But which actions should you include, and are you sure that these actions cover all aspects? We have performed a thorough study of the change strategy literature that is the found......Both ISO/IEC 15504 (SPICE) and ISO/IEC 33014 include a step in their improvement process called: Develop action plan. But which actions should you include, and are you sure that these actions cover all aspects? We have performed a thorough study of the change strategy literature...... that is the foundation for the ten overall change strategies defined in ISO/IEC 33014. We have extracted statements from this material that represent generic actions recommended by the authors for each strategy. Through analytic induction we have then identified and validated eight aspects that you should consider when...... choosing your concrete actions for executing the strategy....

  19. Action of personal planning in the mining firm

    Directory of Open Access Journals (Sweden)

    Antošová Mária

    2004-06-01

    Full Text Available Planning in the personal area is systematically performed by the way of forcasting of future needs and reserves in human resources in every organization. By evaluating the number and the kind of employees, the organization will need, the department of human resources management can plan their obtaining, education and development, or the working process.The paper is dealing with the neccessity for the personal planning in every organization, irrespective of to its volume or tasks and area of planning. Planning of human resources demand a valuable, detailed and actural information, without that it cannot formulate real goals and predict the development of indexes influencing for achievement of such goals. To such information belong external factors (the prognosis of state economy development, competition, work market, etc., as well as the internal information that have an influence on the obtaining and forming of working power. In the next part I deal with the process of personal planning and methods of evaluation for workers needs. The process of one method - based on the analysis of development trends is used as an example of the calculation of planning the number of workers in 2004 in mining organization.Personal planning is very demanding for time, human and financial sources. When their creators will sufficiently understand every internal and external factors in a process of personal planning, they can very effectively predict tactical and strategical needs of their organization.

  20. Succession planning: a call to action for nurse executives.

    Science.gov (United States)

    Trepanier, Sylvain; Crenshaw, Jeannette T

    2013-10-01

    To discuss the organisational benefits of strategic succession planning in acute care hospital settings as a responsibility of chief nurse executives. A formal succession planning process is crucial to the financial and operational viability and sustainability of acute care hospitals. A succession plan is an essential business strategy that promotes effective leadership transition and continuity while maintaining productivity. Nursing and business literature were reviewed; reports contrasting institutions with and without succession plans were examined; and, operational implications were considered. It is imperative that chief nurse executives respond to the business benefits of an effective succession planning programme, identify common barriers and solutions, and implement best practices for a successful strategic succession planning programme. A strategic succession planning programme may offer many benefits to an acute care hospital, including improved retention rates, increased staff engagement and enhanced financial performance. Considering the ageing nursing workforce and the potential increase in demand for nursing services in the near future, nurse executives and other nurse leaders must actively engage in a formal succession planning process. A formal succession planning programme will help to provide strategic leadership continuity, operational effectiveness and improved quality of care. © 2013 John Wiley & Sons Ltd.

  1. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the

  2. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative

  3. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    2010-01-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative

  4. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2010-11-22

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed

  5. Motor planning is facilitated by adopting an action's goal posture: An fMRI study

    NARCIS (Netherlands)

    Zimmermann, M.; Meulenbroek, R.G.J.; Lange, F.P. de

    2012-01-01

    Abstract: Motor planning is a hierarchical process that is typically organized around an action's goal (e.g., drinking from a cup). However, the motor plan depends not only on the goal but also on the current body state. Here, we investigated how one's own body posture interacts with planning of

  6. Uranium Mill Tailings Remedial Action Project Environmental Line Management Audit Action Plan. Final report. Audit, October 26, 1992--November 6, 1992

    International Nuclear Information System (INIS)

    1993-07-01

    This Action Plan contains responses, planned actions, and estimated costs for addressing the findings discovered in the Environmental Management Audit conducted for the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRA), October 26 through November 6, 1992. This document should be read in conjunction with the Audit Report to ensure the findings addressed in this document are fully understood. The scope of the UMTRA Environmental Management Audit was comprehensive and encompassed all areas of environmental management except environmental programs pertaining to the National Environmental Policy Act (NEPA) compliance. The Audit Report listed 18 findings: 11 were identified as compliance findings, and the remaining 7 were best management practice findings. Root cause analysis was performed on all the findings. The results of the analysis as well as planned corrective actions are summarized in Section 5.0. All planned actions were prioritized using the Tiger Team Assessment Corrective Action Plan system. Based on assigned priorities, all planned actions were costed by fiscal year. This Action Plan contains a description of the organizational and management structures to be used to implement the Action Plan, a brief discussion of root cause analysis and funding, followed by the responses and planned actions for each finding. A member of the UMTRA Project Office (PO) has been assigned responsibility for tracking the progress on each of the findings. The UMTRA PO staff wrote and/or approved all of the corrective actions recorded in this Action Plan

  7. Solar Energy Technologies Program: Multi-Year Technical Plan 2003-2007 and Beyond

    Energy Technology Data Exchange (ETDEWEB)

    2004-01-01

    This publication charts a 5-year planning cycle for the U.S. Department of Energy Solar Energy Technologies Program. The document includes anticipated technical plans for the next 5 years for photovoltaics, concentrating solar power, solar water and space heating, solar hybrid lighting, and other new concepts that can take advantage of the solar resource. Solar energy is described as a clean, abundant, renewable energy resource that can benefit the nation by diversifying our energy supply.

  8. Rural planning organizations--their role in transportation planning and project development in Texas : technical report.

    Science.gov (United States)

    2010-10-01

    While a formal planning and programming process is established for urbanized areas through Metropolitan : Planning Organizations, no similar requirement has been established for rural areas. Currently, under the : Safe, Accountable, Flexible, Efficie...

  9. Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2014-05-01

    Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

  10. Planning from the bottom up : Democratic decentralisation in action

    NARCIS (Netherlands)

    Pal, A.

    2010-01-01

    This research highlights the gap between the official rhetoric and the political reality of democratic decentralisation and bottom-up planning using an indepth study of the metropolitan planning process in Kolkata, India. The key question that I address here is: how do elected officials at different

  11. 29 CFR 30.4 - Affirmative action plans.

    Science.gov (United States)

    2010-07-01

    ..., training, and motivation of present and potential minority and female (minority and nonminority... officers, supervisors, employees, and members and to encourage such persons to take the necessary action to...

  12. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2000-08-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site.

  13. 'Action 2016': AREVA's strategic action plan to improve performance; 'Action 2016': le plan d'actions strategique d'AREVA pour ameliorer sa performance

    Energy Technology Data Exchange (ETDEWEB)

    Marie, Patricia; Floquet-Daubigeon, Fleur; Michaut, Maxime; De Scorbiac, Marie; Du Repaire, Philippine

    2011-12-12

    On December 12, 2011, Luc Oursel, Executive Officer of AREVA, and Pierre Aubouin, Chief Financial Executive Officer, presented the group's 'Action 2016' strategic action plan based on an in-depth analysis of the market's outlook. This document makes, first, a Detailed presentation of the 'Action 2016' plan and then presents the group's financial outlook: - Full-year 2011 immediate accounting consequences of the new market environment: operating losses expected in 2011; - 2012-2013 transition period Objective: self-finance capex in cumulative terms; - 2014-2016: safe growth and cash generation, free operating cash flow at break-even beginning in 2013, above euro 1 bn per year beginning in 2015

  14. Planning, preparation, execution, and imagery of volitional action.

    Science.gov (United States)

    Deecke, L

    1996-03-01

    There are different motor sets, which a human subject can be in or act from: he or she can be in a self-initiated voluntary movement set (action) or in a response set (re-action). Also, imagery sets are available that are necessary for the acquisition and practice of skill. Most important are such imagery sets for rehearsal in theatre, dance, music, sports, combat, etc.

  15. Does action planning moderate the intention-habit interaction in the exercise domain? A three-way interaction analysis investigation.

    Science.gov (United States)

    de Bruijn, Gert-Jan; Rhodes, Ryan E; van Osch, Liesbeth

    2012-10-01

    Both habit strength and action planning have been found to moderate the intention-exercise behaviour relationship, but no research exists that has investigated how habit strength and action planning simultaneously influence this relationship. The present study was designed to explore this issue in a prospective sample of undergraduate students (N = 415): action planning, habit strength, intention, attitudes, subjective norms and perceived behavioural control were assessed at baseline and exercise behaviour was assessed 2 weeks later. Both habit strength and action planning moderated the intention-exercise relationship, with stronger relationship at higher levels of planning or habit strength. Decomposing a significant action planning × habit strength × intention interaction showed that the strength of the intention-exercise relationship progressed linearly through levels of action planning and habit strength. These novel results show that action planning strengthens the intention-habit strength interaction in the exercise domain: exercise interventions should therefore focus on simultaneously bolstering action planning and habit strength.

  16. Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2012-09-01

    Corrective Action Unit (CAU) 105 is located in Area 2 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 105 is a geographical grouping of sites where there has been a suspected release of contamination associated with atmospheric nuclear testing. This document describes the planned investigation of CAU 105, which comprises the following corrective action sites (CASs): • 02-23-04, Atmospheric Test Site - Whitney • 02-23-05, Atmospheric Test Site T-2A • 02-23-06, Atmospheric Test Site T-2B • 02-23-08, Atmospheric Test Site T-2 • 02-23-09, Atmospheric Test Site - Turk These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 105. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with all CAU 105 CASs are from atmospheric nuclear testing activities. The presence and nature of contamination at CAU

  17. Assessment for active living: harnessing the power of data-driven planning and action.

    Science.gov (United States)

    Bors, Philip A; Brownson, Ross C; Brennan, Laura K

    2012-11-01

    Robert Wood Johnson Foundation's Active Living by Design (ALbD) grant program funded 25 communities across the U.S. The ALbD National Program Office (NPO) supported grantee community partnerships with technical assistance for assessment, planning, and implementation activities intended to increase population levels of physical activity. This paper analyzes and summarizes the range of assessments conducted to identify local barriers and opportunities for active living as important elements of a thorough intervention planning process. Evaluation of the partnerships focused on documenting community changes and strategies used to produce those changes. With support from NPO staff and external evaluators, partnerships tracked and summarized their community assessment approaches as well as strengths and challenges in conducting assessments. The partnerships documented a range of assessment strategies and methods. Partnerships used several qualitative methods, including focus groups, individual and group interviews, and public meetings. Quantitative methods included surveys, audits, observations, and analysis of existing data, among others. The environmental audit was the most common assessment method used by the partnerships. Assessment processes and findings were used for not only intervention planning but also community engagement and direct advocacy. Assessment data collectors varied from professional staff to community volunteers. Assessments were essential to the identification of local barriers and assets related to active living, which in turn helped ALbD partnerships prioritize and refine their action strategies. Assessment processes were also valuable in building relationships with new partners, community members, and local officials. Copyright © 2012 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  18. Achieving focused infrastructure investment in South Africa: Technical advances in provincial spatial planning

    CSIR Research Space (South Africa)

    Meiklejohn, C

    2008-11-01

    Full Text Available This paper presents the CSIR’s contribution to technical advances in the approach to provincial spatial planning in South Africa. It demonstrates the CSIR’s involvement in conducting the national Provincial Growth and Development Strategy Assessment...

  19. Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2004-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to CAS 23-02-08. The scope of the corrective action investigation

  20. Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0

    Energy Technology Data Exchange (ETDEWEB)

    Susan Evans

    2004-11-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a

  1. Corrective Action Investigation Plan for Corrective Action Unit 145: Wells and Storage Holes, Nevada Test Site, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    David A. Strand

    2004-09-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 145: Wells and Storage Holes. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 145 is located in Area 3 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 145 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-20-01, Core Storage Holes; (2) 03-20-02, Decon Pad and Sump; (3) 03-20-04, Injection Wells; (4) 03-20-08, Injection Well; (5) 03-25-01, Oil Spills; and (6) 03-99-13, Drain and Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. One conceptual site model with three release scenario components was developed for the six CASs to address all releases associated with the site. The sites will be investigated based on data quality objectives (DQOs) developed on June 24, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQOs process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 145.

  2. Corrective Action Investigation Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada with ROTC 1

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2014-09-01

    Corrective Action Unit (CAU) 541 is co-located on the boundary of Area 5 of the Nevada National Security Site and Range 65C of the Nevada Test and Training Range, approximately 65 miles northwest of Las Vegas, Nevada. CAU 541 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 541, which comprises the following corrective action sites (CASs): 05-23-04, Atmospheric Tests (6) - BFa Site; 05-45-03, Atmospheric Test Site - Small Boy. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on April 1, 2014, by representatives of the Nevada Division of Environmental Protection; U.S. Air Force; and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 541. The site investigation process also will be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CASs 05-23-04 and 05-45-03 are from nuclear testing activities conducted at the Atmospheric Tests (6) - BFa Site and Atmospheric Test Site - Small Boy sites. The presence and nature of

  3. Corrective Action Investigation Plan for Corrective Action Unit 571: Area 9 Yucca Flat Plutonium Dispersion Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, Bernadine; Matthews, Patrick

    2013-07-01

    CAU 571 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 571, which comprises the following corrective action sites (CASs): • 09-23-03, Atmospheric Test Site S-9F • 09-23-04, Atmospheric Test Site T9-C • 09-23-12, Atmospheric Test Site S-9E • 09-23-13, Atmospheric Test Site T-9D • 09-45-01, Windrows Crater These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on March 6, 2013, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (now the Nevada Field Office). The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 571. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CAU 571 CASs are from nuclear testing activities. The DQO process resulted in an assumption that total effective dose (TED) within a default contamination boundary exceeds the final action level (FAL) and requires corrective action. The presence and nature of contamination outside the default

  4. Goal Format in Small-Sided Soccer Games: Technical Actions and Offensive Scenarios of Prepubescent Players

    Directory of Open Access Journals (Sweden)

    Craig Pulling

    2016-11-01

    Full Text Available The aim of this study was to investigate the influence of the number of goal-posts and the positioning of goal-posts used within small-sided games on the frequency of technical actions and offensive scenarios performed by prepubescent players within soccer. The participants were eight male prepubescent soccer players (12.1 ± 0.5 years. The participants were video recorded for 20 min playing four different formats of 4v4 small-sided games: (1 standard two goal game; (2 four goal game, one goal in each corner; (3 two goal game with goal-posts positioned 9.14 m/10 yd infield, scoring only through the back of the goal; (4 four goal-game, one goal positioned 9.14 m/10 yd infield in each corner, scoring through either the front or back of each goal. Chi-squared tests of independence were utilized to statistically explore the impact of the different small-sided game formats. There were significant associations (p < 0.05 observed between the different small-sided game formats and the frequency of turns, dribbles, shots, goals and overlaps performed. For example, players performed more turns in small-sided game format two and more shots during small-sided game format four. It is suggested coaches should consider using a variation of the number and positioning of goal-posts in small-sided games as an effective training tool in the development of prepubescent soccer players. This will enable coaches to vary the focus of sessions, and develop specific technical and tactical actions within a situation similar to that of real match-play.

  5. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine Nevada National Security Site, Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene [Navarro, Las Vegas, NV (United States)

    2017-08-01

    This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigation (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.

  6. Twin peaks: an ERP study of action planning and control in co-acting individuals.

    Science.gov (United States)

    Sebanz, Natalie; Knoblich, Günther; Prinz, Wolfgang; Wascher, Edmund

    2006-05-01

    Previous studies have shown that perceiving another's actions activates corresponding representations in an observer's action system. The present study investigated how performing a task with another person affects action planning and control. Reaction times (RTs) and event-related potentials were measured while participants performed a go/no-go task alone and with another person. Three effects of acting together were observed. First, RTs were slowed when individuals had to respond to a stimulus referring to the other's action, suggesting that an action selection conflict occurred. Second, at frontal sites, a stimulus referring to the other's action elicited a similar electrophysiological response as a stimulus referring to one's own action. Finally, on no-go trials, P300 amplitude was significantly larger in a group setting, indicating that an action was suppressed. These findings provide evidence that individuals acting in a social context form shared action representations.

  7. Model Action Plan for Nuclear Forensics and Nuclear Attribution

    International Nuclear Information System (INIS)

    Dudder, G B; Niemeyer, S; Smith, D K; Kristo, M J

    2004-01-01

    Nuclear forensics and nuclear attribution have become increasingly important tools in the fight against illegal trafficking in nuclear and radiological materials. This technical report documents the field of nuclear forensics and nuclear attribution in a comprehensive manner, summarizing tools and procedures that have heretofore been described independently in the scientific literature. This report also provides national policy-makers, decision-makers, and technical managers with guidance for responding to incidents involving the interdiction of nuclear and radiological materials. However, due to the significant capital costs of the equipment and the specialized expertise of the personnel, work in the field of nuclear forensics has been restricted so far to a handful of national and international laboratories. In fact, there are a limited number of specialists who have experience working with interdicted nuclear materials and affiliated evidence. Most of the laboratories that have the requisite equipment, personnel, and experience to perform nuclear forensic analysis are participants in the Nuclear Smuggling International Technical Working Group or ITWG (see Section 1.8). Consequently, there is a need to disseminate information on an appropriate response to incidents of nuclear smuggling, including a comprehensive approach to gathering evidence that meets appropriate legal standards and to developing insights into the source and routes of nuclear and radiological contraband. Appendix A presents a ''Menu of Options'' for other Member States to request assistance from the ITWG Nuclear Forensics Laboratories (INFL) on nuclear forensic cases

  8. 78 FR 22257 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Science.gov (United States)

    2013-04-15

    ... response officials make radiation protection decisions during emergencies. EPA, in coordination with a... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OAR-2007-0268; FRL-9707-2] Updates to Protective Action...: Environmental Protection Agency (EPA). ACTION: Notice of document availability for interim use and public...

  9. Corrective Action Investigation Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Grant Evenson

    2006-01-01

    Corrective Action Unit (CAU) 139 is located in Areas 3, 4, 6, and 9 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 139 is comprised of the seven corrective action sites (CASs) listed below: (1) 03-35-01, Burn Pit; (2) 04-08-02, Waste Disposal Site; (3) 04-99-01, Contaminated Surface Debris; (4) 06-19-02, Waste Disposal Site/Burn Pit; (5) 06-19-03, Waste Disposal Trenches; (6) 09-23-01, Area 9 Gravel Gertie; and (7) 09-34-01, Underground Detection Station. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives with the exception of CASs 09-23-01 and 09-34-01. Regarding these two CASs, CAS 09-23-01 is a gravel gertie where a zero-yield test was conducted with all contamination confined to below ground within the area of the structure, and CAS 09-34-01 is an underground detection station where no contaminants are present. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for the other five CASs where information is insufficient. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 4, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 139

  10. Technical specification action requirements for AFW system failures: Method development and application to four PWR plants

    International Nuclear Information System (INIS)

    Mankamo, T.; Kim, I.S.; Yang, Ji Wu; Samanta, P.K.

    1996-01-01

    Failures in the auxiliary feedwater (AFW) system of pressurized water reactors (PWRs) are considered to involve substantial risk whether a decision is made to either continue power operation while repair is being done, or to shut down the plant to undertake repairs. Technical specification action requirements usually require immediate plant shutdown in the case of multiple failures in the system (in some cases, immediate repair of one train is required when all AFW trains fail). This paper presents a probabilistic risk assessment-based method to quantitatively evaluate and compare both the risks of continued power operation and of shutting the plant down, given known failures in the system. The method is applied to the AFW system for four different PWRs. Results show that the risk of continued power operation and plant shutdown both are substantial, but the latter is larger than the former over the usual repair time. This was proven for four plants with different designs: two operating Westinghouse plants, one operating Asea-Brown Boveri Combustion Engineering Plant, and one of evolutionary design. The method can be used to analyze individual plant design and to improve AFW action requirements using risk-informed evaluations

  11. Quality assurance project plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    This quality assurance project plan defines project organization and roles of responsibility, sampling and field procedures, sample documentation and chain-of-custody protocols, equipment calibration, analytical procedures, data reduction and validation, and internal quality control procedures for the former YS-860 Firing Ranges removal action at the Oak Ridge Y-12 Plant. The ENTECH Team will maintain the highest standards to ensure strict compliance with this plan. Implementation of this plan will include consideration of the technical, as well as administrative, aspects of activities affecting quality. Plan implementation is based on the premise that quality controls selected for each element of work are consistent with the risk, importance, and health and safety considerations of performing the work. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of two small arms firing ranges. This plan covers the removal action at the former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification sampling, grading, and revegetation

  12. Nordic plan of action against pollution of the sea

    International Nuclear Information System (INIS)

    1990-01-01

    The Nordic Council of Ministers programme on reduction of the marine pollution is presented. The actions are to be taking against land-based discharges, metals, organic and radioactive matters, discharges from the continental shelf, dumping and combustion of waste in the seas, pollution from ships, acute leaks of petroleum, chemicals and radioactive matter. (CLS)

  13. [Mental health and work: integrated technical actions between services for preventive hygiene and worksite safety and mental health centers].

    Science.gov (United States)

    Bosco, M G; Salerno, S; Valcella, F

    1999-01-01

    We analyzed occupational and mental health activities in an occupational health service and in a mental health service using the Method of Organizational Congruences (MOC). No technical actions in either services were dedicated to mental health at work although this is prescribed by the Italian law (833/76) and has a demand among the local shared users identified in this study. We propose integrated technical action for mental health in public health services to address the risk of stress, burnout and mobbing in the workplace. Attention is drawn to the need for further research on health services in the field of organization and mental well-being.

  14. Training Effectiveness Assessment of Red Cape: Crisis Action Planning and Execution

    National Research Council Canada - National Science Library

    Schaefer, Peter S; Shadrick, Scott B; Beaubien, Jeff; Crabb, Brian T

    2008-01-01

    The crisis response training program Red Cape: Crisis Action Planning and Execution uses theme-based training and multimedia scenarios to instill expert thinking patterns in crisis response personnel...

  15. Initial Remedial Action Plan for Expanded Bioventing System BX Service Station, Patrick Air Force Base, Florida

    National Research Council Canada - National Science Library

    1995-01-01

    This initial remedial action plan presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at the BX Service Station at Patrick Air Force Base (AFB), Florida...

  16. NRC action plan developed as a result of the TMI-2 accident. Volume 2

    International Nuclear Information System (INIS)

    1980-05-01

    The Action Plan provides a comprehensive and integrated plan for all actions judged necessary by the Nuclear Regulatory Commission to correct or improve the regulation and operation of nuclear facilities based on the experience from the accident at the Three Mile Island, Unit 2, nuclear facility and the official studies and investigations of the accident. The tables included in this volume list the recommendations from the various organizations and task forces investigating the accident at Three Mile Island. The tables are annotated to provide easy references to the associated parts of the Action Plan in Volume 1. The tables are also annotated to provide a shorthand indication of how the various recommendations are treated in the Action Plan

  17. The structure of technical actions in the all-in wrestling on the example of Cadets' European Championships - Warsaw 2007

    Directory of Open Access Journals (Sweden)

    Kruchewskij A.

    2010-06-01

    Full Text Available Successive significant amendments to wrestling regulations made competitors and coaches adapt technical-tactical actions to the needs of the new situation of the fight. The main objective of the study is an analysis of the course of a wrestling match in events of the rank of the European championships allowing a determination of dominant technical actions of Greco-Roman wrestlers at the age of 14-16 years. 221 competitors from 33 countries took part in Cadets' European Championships in the Greco-Roman style in Warsaw. An analysis of technical actions comprised all offensive and defensive actions both in the standing and in the kneeling position during every round of the fight. In 255 fights athletes performed 1500 technical actions and tactical operations, for which they received 2891 points in total. A method of secondary direct observation was used for observation of the course of a wrestling match. During Cadets' European Championships athletes most often used the technique "taking down" in the standing position (13%, and the "cart" during the fight in the kneeling position (27%. Key words: combat sports, structure of a fight, Greco-Roman wrestling

  18. National action plan 2016-2019 for the management of the radon-related risk

    International Nuclear Information System (INIS)

    Mortureux, Marc; Vallet, Benoit; Struillou, Yves; Girometti, Laurent

    2017-01-01

    After a brief presentation of the context, and a presentation of aspects related to the plan governance and strategies (plan steering, actors in the radon risk management, synthesis of main actions in France, regulatory evolutions and new strategies), this report presents the three axes of the national action plan for 2016-2019. The first one consists in the implementation of a global strategy of information and in developing tools to collect and share information. The second one consists in a continuous knowledge improvement. The third one consists in a better taking into account of radon risk management in buildings. Sheets are then proposed which describe the various actions associated with these axes (5 actions for the first one, 10 for the second, and 5 for the third one). Each sheet comprises the action title, its objectives, methods and tools, its coordinator and actors, its agenda and current status

  19. Enhancing Effective Stakeholder Participation in Local Groundwater Sustainability Planning through Technical Assistance in California

    Science.gov (United States)

    Weintraub, C.; Christian-Smith, J.; Dobbin, K.; Cullen, K.

    2017-12-01

    This presentation will share content from UCS's new publication, Getting Involved in Groundwater; A Guide to Effective Engagement in California's Groundwater Sustainability Plans, as well as lessons learned from collaborating with community organizations to provide technical assistance to Groundwater Sustainability Agency (GSA) board members and stakeholders in the San Joaquin Valley on Groundwater Sustainability Plan (GSP) development. California's Sustainable Groundwater Management Act (SGMA) mandates extensive stakeholder engagement, presenting an opportunity for unincorporated, low-income communities that have historically been affected by but not included in water decisions. However, implementation requires a concerted, thoughtful effort. Through technical assistance and strategic outreach, the Union of Concerned Scientists (UCS) is working to ensure stakeholder engagement in GSP development is robust, diverse, and supported by the best science available. UCS created the GSP stakeholder engagement guide to equip GSA members, scientists and interested community members to meaningfully engage in the GSP development process. The guide serves as a technical primer on SGMA's GSP process and as a resource for understanding groundwater management in California. The guide is just one component of a larger effort to overcome barriers to effective engagement in sustainable groundwater management, especially those presented by technical information. In April, UCS co-hosted a technical assistance workshop for GSA and advisory committee members in Visalia, CA with the Community Water Center (CWC), a local environmental justice non-profit. The workshop was well received and UCS and the CWC were invited to host a second workshop in June. To deepen this engagement and provide one-on-one technical assistance, UCS developed a program to match relevant water experts in the UCS Science Network with GSA members or involved community members in need of specific technical support

  20. Who formulates self-regulatory action plans regarding fruit consumption? An application of the big five personality theory.

    NARCIS (Netherlands)

    de Bruijn, G.-J.

    2013-01-01

    Objective: Action planning is regarded as an important correlate and predictor of health behaviour, but little is known about antecedents of action planning. Because personality constructs have been shown to moderate the effect of action planning interventions, the present study tested associations

  1. Standard review plan for the review and evaluation of emergency plans for research and test reactors. Technical report

    International Nuclear Information System (INIS)

    Bates, E.F.; Grimes, B.K.; Ramos, S.L.

    1982-05-01

    This document provides a Standard Review Plan for the guidance of the NRC staff to assure that complete and uniform reviews are made of research and test reactor emergency plans. The report is organized under ten planning standards which correspond to the guidance criteria in Draft II of ANSI/ANS 15.16 as endorsed by Revision 1 to Regulatory Guide 2.6. The applicability of the items under each planning standard is indicated by subdivisions of the steady state thermal power levels at which the reactors are licensed to operate. Standard emergency classes and example action levels for research and test reactors which should initiate these classes are given in an Appendix

  2. Corrective Action Investigation Plan for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    David Strand

    2006-01-01

    contaminants of concern are present. (5) If contaminants of concern are present, collect additional step-out samples to define the extent of the contamination. (6) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes. This Corrective Action Investigation Plan has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection, and field work will commence following approval

  3. Homeland Security Strategic Research Action Plan 2012 - 2016

    Science.gov (United States)

    EPA’s Homeland Security research plan outline and how it will address science and technological gaps and improve the Agency’s ability to carry out its responsibilities associated with preparing for and responding to, terrorist attacks, and other disasters.

  4. Plan of Action | Women in Science | Initiatives | Indian Academy of ...

    Indian Academy of Sciences (India)

    This should summarize the aims of the working committee and the initiatives it plans to undertake. This page could serve the role of being a repository mentioned under point 1 once it is developed. Similarly, an article discussing the issues involved to increase the awareness of the Scientific Community to these issues, ...

  5. Uranium Mill Tailings Remedial Action Project Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Department of Energy (DOE) has issued requirements for complying with DOLE and other Federal agency environmental regulations. DOE Order 5400.1 requires environmental monitoring plans for each DOE operation that uses, generates, releases, or manages pollutants of radioactive and hazardous materials

  6. Corrective Action Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    D. L. Gustafason

    2001-02-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order of 1996. This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 2000). The CAU includes two Corrective Action Sites (CASs): 25-23-09, Contaminated Waste Dump Number 1; and 25-23-03, Contaminated Waste Dump Number 2. Investigation of CAU 143 was conducted in 1999. Analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine constituents of concern for CAU 143. Radionuclide concentrations in disposal pit soil samples associated with the Reactor Maintenance, Assembly, and Disassembly Facility West Trenches, the Reactor Maintenance, Assembly, and Disassembly Facility East Trestle Pit, and the Engine Maintenance, Assembly, and Disassembly Facility Trench are greater than normal background concentrations. These constituents are identified as constituents of concern for their respective CASs. Closure-in-place with administrative controls involves use restrictions to minimize access and prevent unauthorized intrusive activities, earthwork to fill depressions to original grade, placing additional clean cover material over the previously filled portion of some of the trenches, and placing secondary or diversion berm around pertinent areas to divert storm water run-on potential.

  7. India's Action Plan for Wildlife Conservation and Role of Voluntary Bodies.

    Science.gov (United States)

    Singh, Samar

    1985-01-01

    Describes India's National Action Plan for wildlife conservation, itemizing and explaining the main components and strategies of this action program. Also presents a historical perspective of conservation practices, policies, and programs. A table of India's national parks and sanctuaries with data from 1970 to 1983 is included. (ML)

  8. Corrective action investigation plan for Corrective Action Unit 340, Pesticide Release Sites, Nevada Test Site, Nye County, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    This Correction Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. As required by the FFACO (1996), this document provides or references all of the specific information for planning investigation activities associated with three Corrective Action Sites (CASs) located at the Nevada Test Site (NTS). These CASs are collectively known as Corrective Action Unit (CAU) 340, Pesticide Release Sites. According to the FFACO, CASs are sites that may require corrective action(s) and may include solid waste management units or individual disposal or release sites. These sites are CAS 23-21-01, Area 23 Quonset Hut 800 (Q800) Pesticide Release Ditch; CAS 23-18-03, Area 23 Skid Huts Pesticide Storage; and CAS 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage (Q15-11). The purpose of this CAIP for CAU 340 is to direct and guide the investigation for the evaluation of the nature and extent of pesticides, herbicides, and other contaminants of potential concern (COPCs) that were stored, mixed, and/or disposed of at each of the CASs.

  9. Corrective Action Investigation Plan for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2012-08-01

    CAU 570 comprises the following six corrective action sites (CASs): • 02-23-07, Atmospheric Test Site - Tesla • 09-23-10, Atmospheric Test Site T-9 • 09-23-11, Atmospheric Test Site S-9G • 09-23-14, Atmospheric Test Site - Rushmore • 09-23-15, Eagle Contamination Area • 09-99-01, Atmospheric Test Site B-9A These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 570. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The presence and nature of contamination at CAU 570 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological

  10. An investigation into the relevance of action planning, theory of planned behaviour concepts, and automaticity for fruit intake action control

    NARCIS (Netherlands)

    de Bruijn, G.J.; Wiedemann, A.; Rhodes, R.E.

    2014-01-01

    Objectives In the action control framework, intention-behaviour discordance is studied around public health guidelines. Although this framework has been applied to physical activity behaviours, it has only seen very limited attention regarding fruit intake. The purpose of this study was therefore to

  11. Remedial action and waste disposal project - ERDF readiness evaluation plan

    International Nuclear Information System (INIS)

    Casbon, M.A.

    1996-06-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the Environmental Restoration and Disposal Facility. The evaluation was conducted at the conclusion of a series of readiness activities that began in January 1996. These activities included completion of the physical plant; preparation, review, and approval of operating procedures; definition and assembly of the necessary project and operational organizations; and activities leading to regulatory approval of the plant and operating plans

  12. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2006-09-01

    Corrective Action Unit (CAU) 543, Liquid Disposal Units, is listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996. CAU 543 consists of seven Corrective Action Sites (CASs) located in Areas 6 and 15 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven CASs: {sm_bullet} CAS 06-07-01, Decon Pad {sm_bullet} CAS 15-01-03, Aboveground Storage Tank {sm_bullet} CAS 15-04-01, Septic Tank {sm_bullet} CAS 15-05-01, Leachfield {sm_bullet} CAS 15-08-01, Liquid Manure Tank {sm_bullet} CAS 15-23-01, Underground Radioactive Material Area {sm_bullet} CAS 15-23-03, Contaminated Sump, Piping From January 24, 2005 through April 14, 2005, CAU 543 site characterization activities were conducted, and are reported in Appendix A of the CAU 543 Corrective Action Decision Document (CADD) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2005). The recommended corrective action as stated in the approved CADD is No Further Action for five of the CAU 543 CASs, and Closure In Place for the remaining two CASs.

  13. Nucleoelectric plants technical memory

    International Nuclear Information System (INIS)

    Araujo Pereira, Alvaro de

    1991-01-01

    The work explains the basic norms that establish the guidelines to the Technical Memory elaboration of this electrical energy sector - the nucleoelectric plants. It guides the technicians who execute the Technical Memory of the plants, exposing the items that may compose the work: contents: introduction, planning, proposition, equipment and materials supply, construction, commissioning, commercial actions, budget, financing and costs; generalities: drawings and photographies, monetary references, terminology, system units, management, graphic guide project, responsible staff, a summarized technical card and illustrations

  14. Assessing Changes in Job Behavior Due to Training: A Guide to the Participant Action Plan Approach.

    Science.gov (United States)

    Office of Personnel Management, Washington, DC.

    This guide provides a brief introduction to the Participant Action Plan Approach (PAPA) and a user's handbook. Part I outlines five steps of PAPA which determine how job behavior is changed by training course or program participation. Part II, the manual, is arranged by the five steps of the PAPA approach. Planning for PAPA discusses making…

  15. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is required. 1106.3 Section 1106.3 Transportation Other Regulations Relating to Transportation (Continued... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS...

  16. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.:0

    Energy Technology Data Exchange (ETDEWEB)

    Wickline, Alfred

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting

  17. The Analysis of Technical Condition of the Automated Systems of Protection and Actions for Their Maintenance in Readiness for Application

    Directory of Open Access Journals (Sweden)

    Marat Venerovich Arifullin

    2014-05-01

    Full Text Available In the article the analysis of technical condition of the existing the automated systems of protection (ASP and the analysis of actions for ASP maintenance in readiness for application is given during post-guarantee of operation on the example of real stationary object – storage of fuels and lubricants.

  18. The action plan for noise reduction in Modena: methods, effects and perspectives.

    Science.gov (United States)

    Campolieti, D; Bertoni, D

    2009-12-01

    Experiences from the action plan concerning noise abatement measures developed in the city of Modena are described. The paper shows noise levels measured after traffic calming measures, after the construction of a noise barrier and a roundabout and after the laying of low-noise pavements. A method for the new action plan design is tested on a large urban area based on a noise map and on a priority index for noise reduction actions taking into account the noise exposure levels and the number of exposed people.

  19. CBRN planning and response: collecting, analyzing, and using actionable knowledge

    Science.gov (United States)

    Angeley, David; Lockhart, Michael

    2006-05-01

    To save lives in a mass casualty event, decision makers need access to a wide range of information and analyses and they need direction on when and how to use that information. We have developed an integrated approach to support decision-making efforts within overwhelming CBRN events. The end product is called the Actionable Knowledge Report (AKR). This tool provides fused knowledge and analysis summaries focused on needs of specified end-users in a near-real time, web-based, multi-level secure, common operating picture environment. The AKR provides to decision makers a tool to meet their overall goal of preserving and saving lives by breaking down their efforts into two broad areas: minimizing casualties, and managing the unavoidable casualties. To do this effectively, a number of capabilities in each of these areas must be considered. To arrive at a solution, capabilities need to be connected into strategies to form a reasonable course of action (COA). To be successful, situational awareness must be maintained, and risks of implementation and sustainability of the execution must be taken into account. In addition, a CBRN situation can overwhelm the existing infrastructure and capabilities. This will place a large burden on the individuals, forcing them to explore alternative and non-conventional strategies. The AKR provides an interactive medium to develop and implement the best COA. Both the AKR and the underlying analytical process (including the incorporation of CBRN casualty and resource estimation tools) are described in this paper.

  20. Uranium Mill Tailings remedial action project waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    1994-07-01

    The purpose of this plan is to establish a waste minimization and pollution prevention awareness (WM/PPA) program for the U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The program satisfies DOE requirements mandated by DOE Order 5400.1. This plan establishes planning objectives and strategies for conserving resources and reducing the quantity and toxicity of wastes and other environmental releases

  1. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    Energy Technology Data Exchange (ETDEWEB)

    A. M. Tyson

    2006-08-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

  2. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    International Nuclear Information System (INIS)

    A. M. Tyson

    2006-01-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project

  3. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems

  4. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  5. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan; FINAL

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  6. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  7. N Springs expedited response action performance monitoring plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    Groundwater contained in the 100-NR-2 Operable Unit is contaminated with various radionuclides derived from waste water disposal practices and spills associated with 100-N Reactor operations. Of primary concern is the presence of high levels of 90 Sr in the groundwater and the discharge of 90 Sr-contaminated groundwater to the nearby Columbia River through historic river bank seeps known as ''N Springs.'' A pump-and-treat system is being installed to remove 90 Sr contamination from the groundwater as part of the N Springs expedited response action (ERA). The groundwater extraction system will consist of four extraction and two injection wells with a proposed initial treatment capacity of 50 gal/min. The proposed location of the groundwater extraction system relative to the 90 Sr groundwater plume is presented

  8. Differential beta-band event-related desynchronization during categorical action sequence planning.

    Science.gov (United States)

    Park, Hame; Kim, June Sic; Chung, Chun Kee

    2013-01-01

    A primate study reported the existence of neurons from the dorso-lateral prefrontal cortex which fired prior to executing categorical action sequences. The authors suggested these activities may represent abstract level information. Here, we aimed to find the neurophysiological representation of planning categorical action sequences at the population level in healthy humans. Previous human studies have shown beta-band event-related desynchronization (ERD) during action planning in humans. Some of these studies showed different levels of ERD according to different types of action preparation. Especially, the literature suggests that variations in cognitive factors rather than physical factors (force, direction, etc) modulate the level of beta-ERD. We hypothesized that the level of beta-band power will differ according to planning of different categorical sequences. We measured magnetoencephalography (MEG) from 22 subjects performing 11 four-sequence actions--each consisting of one or two of three simple actions--in 3 categories; 'Paired (ooxx)', 'Alternative (oxox)' and 'Repetitive (oooo)' ('o' and 'x' each denoting one of three simple actions). Time-frequency representations were calculated for each category during the planning period, and the corresponding beta-power time-courses were compared. We found beta-ERD during the planning period for all subjects, mostly in the contralateral fronto-parietal areas shortly after visual cue onset. Power increase (transient rebound) followed ERD in 20 out of 22 subjects. Amplitudes differed among categories in 20 subjects for both ERD and transient rebound. In 18 out of 20 subjects 'Repetitive' category showed the largest ERD and rebound. The current result suggests that beta-ERD in the contralateral frontal/motor/parietal areas during planning is differentiated by the category of action sequences.

  9. Issues concerning a diagnostic study of an action plan for the San Juan river basin

    Science.gov (United States)

    Yamaguchi, Hiromi; Futamura, Hisanori; Nakayama, Mikiyasu

    2004-11-01

    An action plan is being formulated for the San Juan River basin, shared by Costa Rica and Nicaragua in Central America. The action plan is assumed to be a planning tool designed to ensure the availability of the goods and services that water resources provide for the conservation of ecosystems and for social and economic development. Development of the action plan comprises two phases, namely elaboration of the diagnostic study and drafting of the action plan. The diagnostic study was published in 1997. After examining previous cases in international water systems, for which the diagnostic study was developed as the precursor of an action plan, the author felt that the existing diagnostic study for the San Juan River basin still had room for improvements, in particular in the following aspects: (a) inventory of past, ongoing and future projects; (b) impacts of reserved areas on the basin as a whole; (c) instruments to promote public participation; (d) support by central decision makers; (e) mechanisms for information transparency. These aspects, which need enhancements, seem to suggest that more emphasis should be put on the soft aspects of the sciences. While the diagnostic study addresses issues of natural environment in detail, both data and analysis of human environments are in low profile. The lesson gained from the Zambezi River basin project is that lack of a proper strategy and political commitments by the central decision makers (of the riparian states) will lead to an impasse in implementation of the project, due mainly to paucity of support within basin countries. Lack of support by the general public may also lead to a failure in the implementation phase. These aspects should have been sufficiently addressed in the diagnostic study, so that appropriate actions (to be listed in the action plan) should be elaborated for implementation.

  10. Corrective Action Investigation Plan for Corrective Action Unit 555: Septic Systems Nevada Test Site, Nevada, Rev. No.: 0 with Errata

    International Nuclear Information System (INIS)

    Pastor, Laura

    2005-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 555: Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 555 is located in Areas 1, 3 and 6 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada, and is comprised of the five corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-59-01, Area 1 Camp Septic System; (2) CAS 03-59-03, Core Handling Building Septic System; (3) CAS 06-20-05, Birdwell Dry Well; (4) CAS 06-59-01, Birdwell Septic System; and (5) CAS 06-59-02, National Cementers Septic System. An FFACO modification was approved on December 14, 2005, to include CAS 06-20-05, Birdwell Dry Well, as part of the scope of CAU 555. The work scope was expanded in this document to include the investigation of CAS 06-20-05. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 555 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI

  11. Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Alfred Wickline

    2009-04-01

    Conduct radiological surveys. • Perform field screening. • Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. • Collect samples of source material to determine the potential for a release. • Collect samples of potential remediation wastes. • Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

  12. Proceedings of the exploratory meeting of experts to define an action plan on best estimate calculations and uncertainty analysis

    International Nuclear Information System (INIS)

    2002-01-01

    The purpose of the meeting was to develop an Action Plan on Best Estimate calculations and uncertainty analysis. This would require to better identify the needs for additional investigations in this field, with a view to reaching technical consensus on understanding and methodologies, and to making progress in the Best Estimate analysis of Design Basis Accidents and Severe Accidents. The meeting was open to organisations interested in participating in the definition of this programme. The following approach had been suggested: - With respect to methodologies already used in safety analysis: - Identify weak points (difficulties regarding implementation, justification of basic assumptions, etc.); this task would require the participation of experts having experience in safety analyses. - Identify questions of general interest (weak points not too specific to a particular methodology). - Perform an inventory and analysis of actions underway to solve the problems. - Propose complementary or supporting actions to make progress together. - With respect to methodologies not yet used in safety analysis: - Identify the issues to be solved, in order to convince end users to make use of the methodology. - Perform an inventory and analysis of actions underway to solve the problems. - Evaluate how much time could be necessary to solve the problem (short term, medium term, long term). - Propose actions to make common progress on the most promising alternative methods. The following actions could be considered, among others: - Examine methodologies used in other fields (weather forecast, etc.). - Develop tools and methods (quantification of basic uncertainties, treatment, etc.) - Develop/improve the validation methodology of uncertainty evaluation methods. - Define a consistent programme of computational benchmark exercises (based on SET and/or IET and/or reactor scenarios) associated to the specification of clear procedures allowing an actual evaluation and comparison of the

  13. Renewable energy plan of action for American Samoa

    Energy Technology Data Exchange (ETDEWEB)

    Shupe, J.W. (USDOE San Francisco Operations Office, Honolulu, HI (USA). Pacific Site Office); Stevens, J.W. (Sandia National Labs., Albuquerque, NM (USA))

    1990-11-01

    American Samoa has no indigenous fossil fuels and is almost totally dependent for energy on seaborne petroleum. However, the seven Pacific Islands located at 14 degrees south latitude that constitute American Samoa have a wide variety of renewable resources with the potential for substituting for imported oil. Included as possible renewable energy conversion technologies are solar thermal, photovoltaics, wind, geothermal, ocean thermal, and waste-to-energy recovery. This report evaluates the potential of each of these renewable energy alternatives and establishes recommended priorities for their development in American Samoa. Rough cost estimates are also included. Although renewable energy planning is highly site specific, information in this report should find some general application to other tropical insular areas.

  14. Climate change in Nova Scotia : a background paper to guide Nova Scotia's climate change action plan

    International Nuclear Information System (INIS)

    2007-10-01

    Climate change causes changes in the temperature of the earth, the level of the sea, and the frequency of extreme weather conditions. The province of Nova Scotia recently released an act related to environmental goals and sustainable prosperity. Addressing climate change is a key element in achieving Nova Scotia's sustainable prosperity goals outlined in the act. The Nova Scotia Department of Energy is working towards developing both policy and action, to help meet its target of a 10 per cent reduction in greenhouse gases from 1990 levels by the year 2020. Two major plans are underway, notably a climate change action plan and a renewed energy strategy. This report provided background information on Nova Scotia's climate change action plan. It discussed climate change issues affecting Nova Scotia, air pollutants, energy sources in Nova Scotia, energy consumers in the province, and Nova Scotia's approach to climate change. The report also discussed actions underway and funding sources. It was concluded that in order for the climate change action plan to be successful, Nova Scotians must use energy more efficiently; use renewable energy; use cleaner energy; and plan for change. 13 refs., 2 tabs., 6 figs., 4 appendices

  15. Corrective Action Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Cox, D. H.

    2000-01-01

    The Area 25 Underground Storage Tanks site Corrective Action Unit (CAU) 135 will be closed by unrestricted release decontamination and verification survey, in accordance with the Federal Facility Agreement and Consert Order (FFACO, 1996). The CAU includes one Corrective Action Site (CAS). The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine-Maintenance Assembly and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999 discussed in the Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada (DOE/NV,1999a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples that exceeded the preliminary action levels are polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Unrestricted release decontamination and verification involves removal of concrete and the cement-lined pump sump from the vault. After verification that the contamination has been removed, the vault will be repaired with concrete, as necessary. The radiological- and chemical-contaminated pump sump and concrete removed from the vault would be disposed of at the Area 5 Radioactive Waste Management Site. The vault interior will be field surveyed following removal of contaminated material to verify that unrestricted release criteria have been achieved

  16. Corrective Action Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    D. H. Cox

    2000-07-01

    The Area 25 Underground Storage Tanks site Corrective Action Unit (CAU) 135 will be closed by unrestricted release decontamination and verification survey, in accordance with the Federal Facility Agreement and Consert Order (FFACO, 1996). The CAU includes one Corrective Action Site (CAS). The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine-Maintenance Assembly and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999 discussed in the Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada (DOE/NV,1999a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples that exceeded the preliminary action levels are polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Unrestricted release decontamination and verification involves removal of concrete and the cement-lined pump sump from the vault. After verification that the contamination has been removed, the vault will be repaired with concrete, as necessary. The radiological- and chemical-contaminated pump sump and concrete removed from the vault would be disposed of at the Area 5 Radioactive Waste Management Site. The vault interior will be field surveyed following removal of contaminated material to verify that unrestricted release criteria have been achieved.

  17. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    Energy Technology Data Exchange (ETDEWEB)

    Vigil-Holterman, Luciana R. [Los Alamos National Laboratory

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

  18. Turning strategy into action: implementing a conservation action plan in the Cape Floristic Region

    CSIR Research Space (South Africa)

    Gelderblom, CM

    2003-07-01

    Full Text Available frustrated with declining funding and an inability to deal with conservation during the 1990s. South Africa?s re-entry to the global community pro- vided this group with opportunities to turn frustration into action (Pierce et al., 2002). Despite the decline... Institute, Pretoria, pp. 31?52. Cowling, R.M., Pierce, S.M., Sandwith, T., 2002. Conclusions. The fundamentals of mainstreaming biodiversity. In: Pierce, S.M., Cowling, R.M., Sandwith, T., MacKinnon, K. (Eds.), Mainstream- ing Biodiversity in Development...

  19. LEAP: local environmental action plan. Municipality of Dolneni

    International Nuclear Information System (INIS)

    2004-01-01

    The Municipality of Dolneni is situated in the northern part of the Pelagonia Valley, at about 600 meters above the sea level. It is surrounded on three sides (north, northeast, east and northwest) by the mountain massifs of Dautica, Babuna and Busova Planina. The assesment of the state of the environment in the Municipality of Dolneni presented in this document is based on several principles, including, before all, human health, as well as impacts from human activities on urban and natural environment, social and economic development, etc. The impacts from environmental pollution on human health in the Municipality of Dolneni are evident. Major problem is the lack of sewerage system to collect wastewater and absence of organized landfill(s) for solid waste disposal. In addition, the improper drinking water supply in most of the settlements contributes to the increased human health risk in the Municipality. The absence of urban planning has lead to developments and uncontrolled use of natural resources that cause degradation of the environment and consequently decrease in quality of living for the population. The above problems affect the quality of living conditions and human health both directly and indirectly. In recent years, incidence of epidemics of communicable hepatitis was recovered (Debreste, Desovo), and there is a concern for a high risk of appearance of intestinal and other infectious diseases. There are no indicators of the soil quality of surface running water resources with regard to pollution. In any case, on the basis of the manner of land use and specific human activities on the territory of the Municipality, as well as on the basis of the above mentioned solid waste and waste water related problems, it may be concluded that these resources are in a rather poor condition. Other aspects of determining the quality of the environment (atmosphere, noise, natural ecosystems and biodiversity in general) are not under serious human pressure at present

  20. Corrective Action Plan for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5 Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    D. S. Tobiason

    2000-08-01

    Area 3 Septic Waste Systems 1 and 5 are located in Area 3 of the Tonopah Test Range (TTR) (Figure 1). The site is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) as Corrective Action Unit (CAU) 428 and includes Corrective Action Sites 03-05-002-SW01 (Septic Waste System 1 [SWS 1]), and 03-05-002-SW05 (Septic Waste System 5 [SWS 5]). The site history for the CAU is provided in the Corrective Action Investigation Plan (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999). SWS 1 consists of two leachfields and associated septic tanks. SWS 1 received effluent from both sanitary and industrial sources from various buildings in Area 3 of the TTR (Figure 2). SWS 5 is comprised of one leachfield and outfall with an associated septic tank. SWS 5 received effluent from sources in Building 03-50 in Area 3 of the TTR (Figure 2). Both systems were active until 1990 when a consolidated sewer system was installed. The purpose of this Corrective Action Plan (CAP) is to provide the strategy and methodology to close the Area 3 SWS 1 and 5. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was done during May and June 1999. Samples of the tank contents, leachfield soil, and soil under the tanks and pipes were collected. The results of the characterization were reported in the Corrective Action Decision Document (CADD) (DOE/NV, 2000). Additional sampling was done in May 2000, the results of which are presented in this plan. Soil sample results indicated that two constituents of concern were detected above Preliminary Action Levels (PALs). Total arsenic was detected at a concentration of 68.7 milligrams per kilogram (mg/kg). The arsenic was found under the center distribution line at the proximal end of the SWS 5 Leachfield (Figure 3). Total benzo(a)pyrene was detected at a concentration of 480 micrograms per kilogram ({micro}g/kg). The benzo(a)pyrene was found in the soil under the

  1. Representation and Integration: Combining Robot Control, High-Level Planning, and Action Learning

    DEFF Research Database (Denmark)

    Petrick, Ronald; Kraft, Dirk; Mourao, Kira

    We describe an approach to integrated robot control, high-level planning, and action effect learning that attempts to overcome the representational difficulties that exist between these diverse areas. Our approach combines ideas from robot vision, knowledgelevel planning, and connectionist machine......-level action specifications, suitable for planning, from a robot’s interactions with the world. We present a detailed overview of our approach and show how it supports the learning of certain aspects of a high-level lepresentation from low-level world state information....... learning, and focuses on the representational needs of these components.We also make use of a simple representational unit called an instantiated state transition fragment (ISTF) and a related structure called an object-action complex (OAC). The goal of this work is a general approach for inducing high...

  2. Draft IAEA Action Plan on Nuclear Safety. Report by the Director General

    International Nuclear Information System (INIS)

    Amano, Y.

    2011-01-01

    In accordance with paragraphs 23 and 24 of the Declaration adopted by the Ministerial Conference on Nuclear Safety held on 20-24 June 2011, the Director General was requested to prepare and present to the Board of Governors and the General Conference at their September 2011 meetings a report on the Ministerial Conference and a draft Action Plan, building on the Ministerial Declaration, the conclusions and recommendations of the working sessions of the Ministerial Conference and the expertise and knowledge available therein, and to facilitate consultations among Member States on the draft Action Plan. This draft Action Plan is the result of an extensive process of consultations with Member States and responds to the request contained in the Ministerial Declaration.

  3. Physical Activity Participation: Social Cognitive Theory versus the Theories of Reasoned Action and Planned Behavior.

    Science.gov (United States)

    Dzewaltowski, David A; Noble, John M; Shaw, Jeff M

    1990-12-01

    Social cognitive theory and the theories of reasoned action and planned behavior were examined in the prediction of 4 weeks of physical activity participation. The theories of reasoned action and planned behavior were supported. Attitude and perceived control predicted intention, and intention predicted physical activity participation. The social cognitive theory variables significantly predicted physical activity participation, with self-efficacy and self-evaluation of the behavior significantly contributing to the prediction. The greater the confidence in participating in physical activity and the greater the satisfaction with present physical activity, the more physical activity performed. Hierarchical regression analyses indicated that perceived control and intentions did not account for any unique variation in physical activity participation over self-efficacy. Therefore the social cognitive theory constructs were better predictors of physical activity than those from the theories of reasoned action and planned behavior.

  4. Corrective Action Investigation Plan for Corrective Action Unit 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada, with ROTC 1 Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick K.

    2013-07-01

    Corrective Action Unit (CAU) 567 is located in Areas 1, 3, 5, 20, and 25 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 567 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 567, which comprises the following corrective action sites (CASs): • 01-23-03, Atmospheric Test Site T-1 • 03-23-25, Seaweed E Contamination Area • 05-23-07, A5b RMA • 20-23-08, Colby Mud Spill • 25-23-23, J-11 Soil RMA These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on May 6, 2013, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 567. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CAU 567 releases are nuclear test operations and other NNSS operations. The DQO process resulted in an assumption that total effective dose (TED) within a default contamination boundary

  5. Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This Corrective Action Investigation Plan (CAIP) describes the U.S. Department of Energy`s (DOE`s) planned environmental investigation of the subsurface Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) No. 443. The CNTA is located in Hot Creek Valley in Nye County, Nevada, adjacent to U.S. Highway 6, about 48 kilometers (km) (30 miles [mi]) north of Wann Springs, Nevada. The CNTA was the site of Project Faultless, a nuclear device detonated in the subsurface by the U.S. Atomic Energy Commission (AEC) in January 1968. The purposes of this test were to gauge the seismic effects of a relatively large, high-yield detonation completed in Hot Creek Valley (outside the Nevada Test Site) and to determine the suitability of the site for future large detonations. The yield of the Faultless test was between 200 kilotons and 1 megaton. Two similar tests were planned for the CNTA, but neither of them was completed (AEC, 1974).

  6. Technical-Oriented Enterprise Resource Planning (ERP) Body of Knowledge for Information Systems Programs: Content and Implementation

    Science.gov (United States)

    Boyle, Todd A.

    2007-01-01

    In this article, the author proposes a body of knowledge that the educators can use to incorporate the technical aspects of enterprise resource planning (ERP) into an information systems (IS) program, encapsulated as the ERP technical knowledge framework. To illustrate the application of this framework, the author discusses a course sequence that…

  7. Corrective Action Plan for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. B. Campbell

    2002-10-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 335, Area 6 Injection Well and Drain Pit, in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (CADD). However, there is one modification to the selected alternative. Due to the large area that would require fencing, it is proposed that instead of fencing, an appropriate number of warning signs attached to tee posts be used to delineate the use restriction area. CAU 335 is located in Area 6 of the Nevada Test Site (NTS) which is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada. CAU 335 is located in the Area 6 Well 3 Yard approximately 39 km (24 mi) north of Mercury, on the Mercury Highway and several hundred feet (ft) west along Road 6-06. CAU 335 consists of the following three Corrective Action Sites (CASs): CAS 06-20-01, Drums, Oil Waste, Spill; CAS 06-20-02, 20-inch Cased Hole; CAS 06-23-03, Drain Pit. The site history for CAU 335 is provided in the Corrective Action Investigation Plan (DOE/NV, 2000). Briefly, CAS 06-20-01, was used for storing material that was pumped out of CAS 06-20-02 and placed into four 208-liter (L) (55-gall [gal]) drums. The drums were taken to the NTS Area 5 Hazardous Waste Accumulation Site in 1991. CAS 06-20-01 will be closed with no further action required. Any spills associated with CAS 06-20-01 are addressed and considered part of CAS 06-20-02. CAS 06-20-02 was used for disposal of used motor oil, wastewater, and debris for an undetermined amount of time. In 1991, the casing was emptied of its contents, excavated, and backfilled. CAS 06-23-03 was used as a depository for effluent waste from truck-washing activities from 1960-1991.

  8. A Multi-Criteria Methodology to Support Public Administration Decision Making Concerning Sustainable Energy Action Plans

    OpenAIRE

    Giuliano Dall'O'; Maria Franca Norese; Annalisa Galante; Chiara Novello

    2013-01-01

    For municipalities that have joined the Covenant of Mayors promoted by the European Commission, the Sustainable Energy Action Plan (SEAP) represents a strategic tool for achieving the greenhouse gas reductions required by 2020. So far as the energy retrofit actions in their residential building stock are concerned, which in the small-to-medium municipalities are responsible for more than 60% of CO 2 emissions, the scenarios for intervening are normally decided on the basis of an economic (cos...

  9. Corrective Action Investigation Plan for Corrective Action Unit 409: Other Waste Sites, Tonopah Test Range, Nevada (Rev. 0)

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2000-10-05

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 409 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 409 consists of three Corrective Action Sites (CASs): TA-53-001-TAB2, Septic Sludge Disposal Pit No.1; TA-53-002-TAB2, Septic Sludge Disposal Pit No.2; and RG-24-001-RGCR, Battery Dump Site. The Septic Sludge Disposal Pits are located near Bunker Two, close to Area 3, on the Tonopah Test Range. The Battery Dump Site is located at the abandoned Cactus Repeater Station on Cactus Peak. The Cactus Repeater Station was a remote, battery-powered, signal repeater station. The two Septic Sludge Disposal Pits were suspected to be used through the late 1980s as disposal sites for sludge from septic tanks located in Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern are the same for the disposal pits and include: volatile organic compounds (VOCs), semivolatile organic compounds, total petroleum hydrocarbons (TPHs) as gasoline- and diesel-range organics, polychlorinated biphenyls, Resource Conservation and Recovery Act metals, and radionuclides (including plutonium and depleted uranium). The Battery Dump Site consists of discarded lead-acid batteries and associated construction debris, placing the site in a Housekeeping Category and, consequently, no contaminants are expected to be encountered during the cleanup process. The corrective action the at this CAU will include collection of discarded batteries and construction debris at the Battery Dump Site for proper disposal and recycling, along with photographic documentation as the process progresses. The corrective action for the remaining CASs involves the collection of background radiological data through borings drilled

  10. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Nevada Site Office, Las Vegas, NV (United States)

    2016-02-01

    CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) were evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material—including lead plates, lead bricks, and lead-shielded cables—was removed during the investigation and requires no additional corrective action.

  11. Technical issues related to NUREG 0800, Chapter 18: Human Factors Engineering/Standard Review Plan

    International Nuclear Information System (INIS)

    Savage, J.W.

    1982-01-01

    The revision of Chapter 18 of NUREG 0800, Human Factors Engineering Standard Review Plan (SRP) will be based on SECY 82-111 and guidance contained in NUREG 0700, NUREG 0801 and NUREG 0835, plus other references. In conducting field reviews of control rooms, the NRC has identified technical issues which can be used to enhance the development of the revised version of NUREG 0800, and to establish priorities among the list of possible Branch Technical Positions (BTP) in NUREG 0800, Rev. 0, Table 18.0-2. This report is a compilation of comments and suggestions from the people who used NUREG 0700 in the Control Room field reviews. This information was used to establish possible BTP topic priorities so that the most important BTPs could be issued first. The comments and suggestions are included for HFEB review in conjunction with the table of priorities

  12. Corrective action investigation plan for Project Shoal Area CAU No. 416

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    This Corrective Action Investigation Plan (CAIP) is part of an ongoing US Department of Energy (DOE)-funded project for the investigation of Corrective Action Unit (CAU) No. 416, Project Shoal Area (PSA). Project Shoal was conducted to determine whether seismic waves produced by underground nuclear testing could be differentiated from naturally occurring earthquakes. The PSA site is located approximately 30 miles southeast of Fallon, Nevada, in the northern portion of Sand Springs Mountains in Churchill County. This CAIP will be implemented in accordance with the Federal Facility Agreement and Consent Order, the Industrial Sites Quality Assurance Project Plan, and all applicable Nevada Division of Environmental Protection policies and regulations.

  13. A Resiliency Action Plan for the National Renewable Energy Laboratory: May 23, 2014 -- June 5, 2015

    Energy Technology Data Exchange (ETDEWEB)

    Vogel, J [Abt Environmental Research, Boulder, CO (United States); Wagner, C. [Abt Environmental Research, Boulder, CO (United States); Renfrow, S. [Abt Environmental Research, Boulder, CO (United States)

    2015-09-03

    The second stage in a two-stage project called the National Renewable Energy Laboratory (NREL) Climate Change Resiliency and Preparedness (CCRP) project is summarized in this resiliency action plan. This CCRP pilot project was funded by the U.S. Department of Energy's Sustainability Performance Office and launched in winter 2014. The resiliency action plan begins where the previous stage of the project -- the vulnerability assessment -- ended. This report discusses resiliency options to reduce the risk of the highest risk vulnerabilities that were identified in the NREL vulnerability assessment.

  14. Towards a Joint Action Plan for Research and Development in the Offshore Wind Service Industry

    DEFF Research Database (Denmark)

    Andersen, Per Dannemand; Piirainen, Kalle A.; Clausen, Niels-Erik

    2015-01-01

    This paper presents a joint action plan (JAP) for research and development and innovation (RDI) in the offshore wind service industry in Denmark, Germany, Norway and the UK. Offshore wind servicing (OWS) is in this context defined as both assembly and installation of offshore wind farms as well...... for a innovation. The JAP is built on this foundation together with stakeholders from the four regions, comprising representatives from R&D and education, policy makers and offshore wind industry. Following the workshop, the ECOWindS consortium has been developing the proposed action plan further based...

  15. Inventory and action plan for greenhouse gas emissions and capture in the Lower Saint Lawrence

    International Nuclear Information System (INIS)

    Granger, F.; Avoine, G.; Michon, P.-Y.; Drainville, L.

    2003-01-01

    The authors reported on a project designed to provide farmers with concrete information based on data from their enterprise to develop an action plan for the reduction of greenhouse gas emissions. This project involved completing an inventory of greenhouse gas emissions and capture for seven farms located in the Lower Saint Lawrence region of Quebec. The authors presented a balance sheet and action plan for the region under study. A total of six priorities were identified. They encompassed measures such as the optimization of nitrogen management in agricultural soils, to increasing the capture rate of carbon dioxide, and reducing the use of fossil fuels. 6 refs., 6 figs

  16. 2011-2015 National action plan for the management of radon-related risk

    International Nuclear Information System (INIS)

    2011-01-01

    After an assessment of the 2005-2008 action plan, this report presents the 2011-2015 plan. It comprises five main axis: the implementation of a policy regarding the management of the radon-related risk in existing dwellings, the implementation of a regulation for new dwellings, the follow-up of the regulation regarding public places and that applicable to workers, the development and the implementation of new management tools for the diagnosis of buildings and works performed by professionals, and the coordination of policy regarding investigation and research. Each axis comprises several actions which are defined and presented. Eight key measures are also defined

  17. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1997

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, H.T.

    1998-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared by the US Department of Energy (DOE) as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP). This MAPAR provides a status on specific DARHT facility design- and construction-related mitigation actions that have been initiated in order to fulfill DOE`s commitments under the DARHT MAP. The functions of the DARHT MAP are to (1) document potentially adverse environmental impacts of the Phased Containment Option delineated in the Final EIS, (2) identify commitments made in the Final EIS and ROD to mitigate those potential impacts, and (3) establish Action Plans to carry out each commitment (DOE 1996). The DARHT MAP is divided into eight sections. Sections 1--5 provide background information regarding the NEPA review of the DARHT project and an introduction to the associated MAP. Section 6 references the Mitigation Action Summary Table which summaries the potential impacts and mitigation measures; indicates whether the mitigation is design-, construction-, or operational-related; the organization responsible for the mitigation measure; and the projected or actual completion data for each mitigation measure. Sections 7 and 8 discuss the Mitigation Action Plan Annual Report and Tracking System commitment and the Potential Impacts, Commitments, and Action Plans respectively. Under Section 8, potential impacts are categorized into five areas of concern: General Environment, including impacts to air and water; Soils, especially impacts affecting soil loss and contamination; Biotic Resources, especially impacts affecting threatened and endangered species; Cultural/Paleontological Resources, especially impacts affecting the archeological site known as Nake`muu; and Human Health and Safety, especially impacts pertaining to noise and radiation. Each potential impact includes a brief statement of the nature of the impact and its cause(s). The commitment

  18. Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility

    Energy Technology Data Exchange (ETDEWEB)

    Bamberger, Judith A; Burks, Barry L; Quigley, Keith D; Falter, Diedre D

    2001-09-28

    The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. This review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.

  19. National action plan to reduce smoking during pregnancy: the National Partnership to Help Pregnant Smokers Quit.

    Science.gov (United States)

    Orleans, Tracy; Melvin, Cathy; Marx, Joseph; Maibach, Edward; Vose, Kathryn Kahler

    2004-04-01

    Although there has been remarkable progress and momentum toward achieving smoke-free pregnancies in the United States since 1990, concerted action is needed to close the remaining gaps in treatment and prevention so that we can reach the Healthy People 2010 goal for pregnant smokers: a prevalence of 1% or less. This need for action led to the formation of the National Partnership to Help Pregnant Smokers Quit, a collaboration among more than 50 organizations and agencies, public and private, that have joined forces to help pregnant smokers quit by providing proven clinical and community-based interventions to every pregnant smoker. This article summarizes the action plan developed by the partnership, the strategies it outlines, and some of the actions taken by partners over the past year to put the plan into action. Action is planned and progress is being made in five strategic areas: offering help through the health care system; using the media effectively; harnessing community and worksite resources; promoting policies known to increase smoking cessation efforts and successes; and expanding national research, surveillance, and evaluation efforts.

  20. Phase II -- Photovoltaics for Utility Scale Applications (PVUSA): Safety and health action plan

    Energy Technology Data Exchange (ETDEWEB)

    Berg, K.

    1994-09-01

    To establish guidelines for the implementation and administration of an injury and illness prevention program for PVUSA and to assign specific responsibilities for the execution of the program. To provide a basic Safety and Health Action Plan (hereinafter referred to as Plan) that assists management, supervision, and project personnel in the recognition, evaluation, and control of hazardous activities and/or conditions within their respective areas of responsibility.

  1. Effects of the number of players and game type constraints on heart rate, rating of perceived exertion, and technical actions of small-sided soccer games.

    Science.gov (United States)

    Abrantes, Catarina I; Nunes, Marta I; Maçãs, Victor M; Leite, Nuno M; Sampaio, Jaime E

    2012-04-01

    The purpose of this study was to identify the variation of heart rate (HR), rating of perceived exertion (RPE), and technical actions between 2 soccer small-sided games (SSGs; 3 × 3 and 4 × 4) in 3 game type constraints (when playing only offense [OFF], playing only defense [DEF], and both situations [GAME]). Sixteen high-level young male players were analyzed (age 15.75 ± 0.45 years; height 172.4 ± 4.83 cm; body mass 64.5 ± 6.44 kg; HRmax199.1 ± 9.08 b·min(-1); and 8.06 ± 1.98 years of soccer practice). All tasks were performed in 4 periods of 4 minutes interspersed with 2 minutes of active recovery. The HR was measured continuously and then analyzed by the time spent into 4 training zones according to individual %HRmax (zone 1 GAME. Despite the known higher frequencies from technical actions in SSGs with fewer players, player effectiveness in 3 × 3 and 4 × 4 was identical. The use of GAME, OFF, and DEF game type constraints should be carefully planned. Using the 3 × 3 format seems more adequate when aiming for aerobic performance optimal effects; however, DEF situations should only be used to promote aerobic recovery effects. The inclusion of an additional player in SSGs had different interactions in game type constraints, and only GAME presented adequate intensity.

  2. Corrective action investigation plan for CAU Number 453: Area 9 Landfill, Tonopah Test Range

    International Nuclear Information System (INIS)

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains the environmental sample collection objectives and criteria for conducting site investigation activities at the Area 9 Landfill, Corrective Action Unit (CAU) 453/Corrective Action (CAS) 09-55-001-0952, which is located at the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range, is approximately 255 kilometers (140 miles) northwest of Las Vegas, Nevada. The Area 9 Landfill is located northwest of Area 9 on the TTR. The landfill cells associated with CAU 453 were excavated to receive waste generated from the daily operations conducted at Area 9 and from range cleanup which occurred after test activities

  3. Local actions to reduce greenhouse gas emissions in the context of national action plans

    International Nuclear Information System (INIS)

    Harvey, L.D.D.

    1995-01-01

    Municipalities can play a number of important roles to complement national actions to limit greenhouse gas emissions: (i) by facilitating comprehensive, city-wide building retrofit activities; (ii) by facilitating the development and/or expansion of community integrated energy systems involving district heating, district cooling, and cogeneration of electricity; and (iii) by promoting urban intensification to reduce the need to use the private automobile. Innovative institutional and financial mechanism are needed to overcome some of the persistent barriers to more efficient energy use in buildings and a number of concepts, which are currently being considered by the City of Toronto as part of its programme to reduce CO 2 emissions by 20% from the 1988 level by 2005, are discussed here. These concepts involve using public securitization funds to leverage private sector funds for energy efficiency retrofits and a number of measures to reduce financing and retrofit transaction costs. Even where surplus electricity generating capacity exists at the regional scale, reduced electricity demand can still result in avoided utility system costs if transmission bottlenecks and future transmission and transformer upgrade costs are reduced. Finally, given the need to replace or modify many of the existing commercial chillers due to the phase out of CFC's, a window of opportunity exists during the next few years to provide alternative, chlorocarbon-free district cooling systems based on absorption chillers using waste heat from electricity generation, with significant (30-65%) CO 2 emission savings. (au)

  4. Corrective Action Investigation Plan for Corrective Action Unit 410: Waste Disposal Trenches, Tonopah Test Range, Nevada, Revision No.:0

    International Nuclear Information System (INIS)

    2002-01-01

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 410 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 410 is located on the Tonopah Test Range (TTR), which is included in the Nevada Test and Training Range (formerly the Nellis Air Force Range) approximately 140 miles northwest of Las Vegas, Nevada. This CAU is comprised of five Corrective Action Sites (CASs): TA-19-002-TAB2, Debris Mound; TA-21-003-TANL, Disposal Trench; TA-21-002-TAAL, Disposal Trench; 09-21-001-TA09, Disposal Trenches; 03-19-001, Waste Disposal Site. This CAU is being investigated because contaminants may be present in concentrations that could potentially pose a threat to human health and/or the environment, and waste may have been disposed of with out appropriate controls. Four out of five of these CASs are the result of weapons testing and disposal activities at the TTR, and they are grouped together for site closure based on the similarity of the sites (waste disposal sites and trenches). The fifth CAS, CAS 03-19-001, is a hydrocarbon spill related to activities in the area. This site is grouped with this CAU because of the location (TTR). Based on historical documentation and process know-ledge, vertical and lateral migration routes are possible for all CASs. Migration of contaminants may have occurred through transport by infiltration of precipitation through surface soil which serves as a driving force for downward migration of contaminants. Land-use scenarios limit future use of these CASs to industrial activities. The suspected contaminants of potential concern which have been identified are volatile organic compounds; semivolatile organic compounds; high explosives; radiological constituents including depleted uranium

  5. Corrective Action Investigation Plan for Corrective Action Unit 555: Septic Systems Nevada Test Site, Nevada, Rev. No.: 0 with Errata

    Energy Technology Data Exchange (ETDEWEB)

    Pastor, Laura

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 555: Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 555 is located in Areas 1, 3 and 6 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada, and is comprised of the five corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-59-01, Area 1 Camp Septic System; (2) CAS 03-59-03, Core Handling Building Septic System; (3) CAS 06-20-05, Birdwell Dry Well; (4) CAS 06-59-01, Birdwell Septic System; and (5) CAS 06-59-02, National Cementers Septic System. An FFACO modification was approved on December 14, 2005, to include CAS 06-20-05, Birdwell Dry Well, as part of the scope of CAU 555. The work scope was expanded in this document to include the investigation of CAS 06-20-05. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 555 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by

  6. Corrective Action Investigation Plan for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2000-12-01

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 335, Area 6 Injection Well and Drain Pit, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 335 consists of three Corrective Action Sites (CASs). The CAU is located in the Well 3 Yard in Area 6 at the Nevada Test Site. Historical records indicate that the Drain Pit (CAS 06-23-03) received effluent from truck-washing; the Drums/Oil Waste/Spill (CAS 06-20-01) consisted of four 55-gallon drums containing material removed from the Cased Hole; and the Cased Hole (CAS 06-20-02) was used for disposal of used motor oil, wastewater, and debris. These drums were transported to the Area 5 Hazardous Waste Accumulation Site in July 1991; therefore, they are no longer on site and further investigation or remediation efforts are not required. Consequently, CAS 06-20-01 will be closed with no further action and details of this decision will be described in the Closure Report for this CAU. Any spills that may have been associated with this CAS will be investigated and addressed under CAS 06-20-02. Field investigation efforts will be focused on the two remaining CASs. The scope of the investigation will center around identifying any contaminants of potential concern (COPCs) and, if present, determining the vertical and lateral extent of contamination. The COPCs for the Drain Pit include: total volatile/ semivolatile organic compounds, total petroleum hydrocarbons (gasoline-and diesel-range organics), ethylene glycol monobutyl ether, polychlorinated biphenyls, total Resource Conservation and Recovery Act metals, and radionuclides. The COPCs for the Cased Hole include: total volatile/ semivolatile organic compounds, total petroleum hydrocarbons (diesel-range organics only), and total Resource Conservation

  7. Corrective Action Decision Document for Corrective Action Unit 5: Landfills, Nevada Test Site, Nevada: Revision No. 0 (with Record of Technical Change No. 1)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-10-24

    This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action (CAU) 5: Landfills, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Areas 5, 6, 12, 20, and 23 of the NTS, CAU 5 is comprised of eight corrective action sites (CASs). The corrective action investigation (CAI) of CAU 5 was conducted from October 7, 2002 through January 30, 2003, with geophysical surveys completed from March 6 through May 8, 2002, and topographic surveys conducted from March 11 through April 29, 2003. Contaminants of concern (COCs) were identified only at CAS 12-15-01. Those COCs included total petroleum hydrocarbons and volatile organic compounds. Based on the evaluation of analytical data from the CAI, review of future and current operations in Areas 5, 6, 12, 20, and 23 of the Nevada Test Site, and the detailed and comparative analysis of the potential CAAs, the following single alternative was developed for consideration. Close in Place with Administrative Controls is the recommended alternative for all of the CASs in CAU 5. This alternative was judged to meet all requirements for the technical components evaluated. Additionally, the alternative meets all applicable state and federal regulations for closure of the sites and will eliminate inadvertent intrusion into landfills at CAU 5.

  8. HighARCS Integrated Action Planning for the Phu Yen District study site, Son La Province, Vietnam

    DEFF Research Database (Denmark)

    Nguyen, Thi Dieu Phuong; Lund, Søren

    The report presents action plans elaborated to preserve aquatic resources and local livelihoods in the Phu Yen District, including methodologies and procedures applied for the selection and assessment of the actions....

  9. Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2010-03-01

    Corrective Action Unit (CAU) 375 is located in Areas 25 and 30 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 375 comprises the two corrective action sites (CASs) listed below: • 25-23-22, Contaminated Soils Site • 30-45-01, U-30a, b, c, d, e Craters Existing information on the nature and extent of potential contamination present at the CAU 375 CASs is insufficient to evaluate and recommend corrective action alternatives (CAAs). This document details an investigation plan that will provide for the gathering of sufficient information to evaluate and recommend CAAs. Corrective Action Site 25-23-22 is composed of the releases associated with nuclear rocket testing at Test Cell A (TCA). Test Cell A was used to test and develop nuclear rocket motors as part of the Nuclear Rocket Development Station from its construction in 1958 until 1966, when rocket testing began being conducted at Test Cell C. The rocket motors were built with an unshielded nuclear reactor that produced as much as 1,100 kilowatts (at full power) to heat liquid hydrogen to 4,000 degrees Fahrenheit, at which time the expanded gases were focused out a nozzle to produce thrust. The fuel rods in the reactor were not clad and were designed to release fission fragments to the atmosphere, but due to vibrations and loss of cooling during some operational tests, fuel fragments in excess of planned releases became entrained in the exhaust and spread in the immediate surrounding area. Cleanup efforts have been undertaken at times to collect the fuel rod fragments and other contamination. Previous environmental investigations in the TCA area have resulted in the creation of a number of use restrictions. The industrial area of TCA is encompassed by a fence and is currently posted as a radioactive material area. Corrective Action Site 30-45-01 (releases associated with the Buggy Plowshare test) is located in Area 30 on Chukar Mesa. It was a

  10. Disentangling self-management goal setting and action planning: A scoping review.

    Directory of Open Access Journals (Sweden)

    Stephanie Anna Lenzen

    Full Text Available The ongoing rise in the numbers of chronically ill people necessitates efforts for effective self-management. Goal setting and action planning are frequently used, as they are thought to support patients in changing their behavior. However, it remains unclear how goal setting and action planning in the context of self-management are defined in the scientific literature. This study aimed to achieve a better understanding of the various definitions used.A scoping review was conducted, searching PubMed, Cinahl, PsychINFO and Cochrane. Inclusion and exclusion criteria were formulated to ensure the focus on goal setting/action planning and self-management. The literature was updated to December 2015; data selection and charting was done by two reviewers. A qualitative content analysis approach was used.Out of 9115 retrieved articles, 58 met the inclusion criteria. We created an overview of goal setting phases that were applied (preparation, formulation of goals, formulation of action plan, coping planning and follow-up. Although the phases we found are in accordance with commonly known frameworks for goal setting, it was striking that the majority of studies (n = 39, 67% did not include all phases. We also prepared an overview of components and strategies for each goal setting phase. Interestingly, few strategies were found for the communication between patients and professionals about goals/action plans. Most studies (n = 35, 60% focused goal setting on one single disease and on a predefined lifestyle behavior; nearly half of the articles (n = 27, 47% reported a theoretical framework.The results might provide practical support for developers of interventions. Moreover, our results might encourage professionals to become more aware of the phases of the goal setting process and of strategies emphasizing on patient reflection. However, more research might be useful to examine strategies to facilitate communication about goals/action plans. It might

  11. Exploring How Nigerian Women Foster Action to Be Taken to Involve More Women Participation in Technical and Vocational Education

    Directory of Open Access Journals (Sweden)

    Robert Akor

    2015-01-01

    Full Text Available Despite the documented benefits to economic and social development of women and the constitutional guarantee for equal right under the law to all citizens, the advancement of the status of women in Nigeria is still far from satisfactory. The participation of women in technical and vocational education is abysmally low. Recent literature describing education of women in technical and vocational education in Nigeria, still need more equality of access to the program. As the Nigerian transition to knowledge economy, information age and vision 20:2020 technologically literate workforce is vital. Likewise the contribution of women to technical and vocational education profession in vital, yet the number of women considering entering historically dominated profession remain at unacceptable level. Employment prospects for women have increased dramatically in the late 20th century. Yet in technical and vocational education profession, a profession that holds promise and opportunity for one to positively impact society-the lack of women in the field seems baffling. In order to examine how Nigerian women foster action to be taken to resolve misrepresentation of women in technical and vocational education in Polytechnic institution a study was important. The purpose of this study was to identify action to be taken so that more women can participate in the program from the perspective of women who are currently enrolled in technical and vocational education program in Polytechnic institution. One major Polytechnic was selected with twelve participants. The descriptive and exploratory research analyzed the interview responses of the participants in order to examine their perceptions. Recommendations made as a result of this study include: a need to formulate specific strategies, policy and program to promote women participation in technical and vocational education, women representation in policymaking bodies; increase number of women lecturers; encourage

  12. Kenya's Climate Change Action Plan. Low Carbon Climate Resilient Development Pathway

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, D.; Sawyer, D.; Stiebert, S.; McFatridge, S. [International Institute for Sustainable Development IISD, Winnipeg, Manitoba (Canada); Wuertenberger, L.; Van Tilburg, X.; Hekkenberg, M. [Energy research Centre of the Netherlands ECN, Policy Studies, Amsterdam (Netherlands); Owino, T.; Battye, W. [ClimateCare, Nairobi (Kenya); Mutia, T. [Regional Institute for Social Enterprise Kenya RISE, Nairobi (Kenya); Olum, P. [Climate Change Consultant (Kenya)

    2012-12-15

    Kenya Vision 2030 - the long-term development blueprint for the country - aims to transform Kenya into 'a newly industrialising, middle-income country providing a high quality of life to all its citizens in a clean and secure environment'. A low carbon climate resilient development pathway, as set out in this Climate Change Action Plan, can help meet Vision 2030 goals through actions that address both sustainable development and climate change. This pathway can also help the Government achieve the Millennium Development Goals and other internationally agreed development goals without compromising the environment and its natural resources. As Kenya realizes its development aspirations, there will be gains and risks. A growing population and economy with migration to cities will mean increases in greenhouse gas (GHG) emissions. Resulting environmental and social conditions, including increased competition over resources, could intensify vulnerability to climate risks. Transitioning to a low carbon climate resilient development pathway can address future risks thereby improving Kenya's ability to prosper under a changing climate while reducing the emissions intensity of a growing economy. Moving forward on the 2010 National Climate Change Response Strategy will help Kenya transition to a low carbon climate resilient development pathway that puts people and livelihoods at the forefront. The strategy recognized the importance of climate change and development, and this Climate Change Action Plan is the logical next step. A yearlong multistakeholder participatory process involving the public sector, private sector and civil society resulted in this Action Plan that identifies priority climate change actions for Kenya for the short, medium and long term. The Government of Kenya takes climate change and its impact on development seriously. Climate change is considered a crosscutting issue that will be mainstreamed in the planning process both at the national

  13. Savannah River Site sample and analysis plan for Clemson Technical Center waste

    International Nuclear Information System (INIS)

    Hagstrom, T.

    1998-04-01

    The purpose of this sampling and analysis plan is to determine the chemical, physical and radiological properties of the SRS radioactive Polychlorinated Biphenyl (PCB) liquid waste stream, to verify that it conforms to Waste Acceptance Criteria of the Department of Energy (DOE) East Tennessee Technology Park (ETTP) Toxic Substance Control Act (TSCA) Incineration Facility. Waste being sent to the ETTP TSCA Incinerator for treatment must be sufficiently characterized to ensure that the waste stream meets the waste acceptance criteria to ensure proper handling, classification, and processing of incoming waste to meet the Waste Storage and Treatment Facility's Operating Permits. This sampling and analysis plan is limited to WSRC container(s) of homogeneous or multiphasic radioactive PCB contaminated liquids generated in association with a treatability study at Clemson Technical Center (CTC) and currently stored at the WSRC Solid Waste Division Mixed Waste Storage Facility (MWSF)

  14. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    International Nuclear Information System (INIS)

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff's review of Atlas Corporation's proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs

  15. Exercise habit strength, planning and the theory of planned behaviour: an action control approach

    NARCIS (Netherlands)

    de Bruijn, G.-J.

    2011-01-01

    Objectives Action control refers to the successful translation of intention into behaviour. The purpose of this study was to explore the potential usefulness of extending intention-exercise profiles with past exercise behaviour and exercise habit strength and the potential discriminative effect of

  16. Updated action plan for the implementation of measures as a consequence of the Fukushima reactor accident

    International Nuclear Information System (INIS)

    2014-01-01

    The action plan of the German government concerning the measures following the Fukushima reactor accident include the decision on the future of nuclear power in Germany, safety analyses, investigations and measures for nuclear power plants in a national frame, investigations in an international frame, planning for the implementation of CNS (Convention on nuclear safety) topics 1-3, i.e. measures to increase the robustness in German nuclear power plants, and the planning of implementation of further measures (CNS topics 4-6).

  17. Practical application of the International Safety Regime in NW Russia: experience from the Norwegian plan of action

    International Nuclear Information System (INIS)

    Sneve, Malgorzata K.; Kiselev, Mikhail; Kochetkov, Oleg; Shandala, Natalya; Smith, Graham

    2008-01-01

    Full text: The Norwegian Radiation Protection Authority (NRPA) and the Federal Medical-Biological Agency (FMBA) of the Russian Federation have a collaboration programme which forms part of the Norwegian government's Plan of Action to improve radiation and nuclear safety in Northwest Russia. The programme seeks to support an efficient and effective regulatory supervision process over the management of the nuclear legacy, taking account of the Russian regulatory framework but also taking advantage of recommendations and guidance from the evolving international safety regime. This paper will present the substantial advances made within that programme, describing on-going progress within specific projects and setting out the value arising from wider involvement in the programme of other organisations such as the IAEA and NATO, as well as the technical support derived from other national agencies and technical organisations. This has been the first opportunity for such international regulatory interaction at the operational level. Specific projects are concerned with the management of the nuclear legacy in Northwest Russia. These include the remediation of previous military facilities, and related spent fuel and radioactive waste management, at the Shore Technical Bases (now designated as Sites of Temporary Storage) at Andreeva Bay and Gremikha. New regulatory guidance documents have been developed, involving major technical inputs from the State Research Centre-Institute of Biophysics, as well as review and advice on relevant good practice in other countries provided by other technical support organisations. Current projects due to complete in 2007 and to be reported upon in the full paper involve development of new regulatory guidance on Very Low-Level Waste management, specifically for the licensing and operation of new VLLW disposal facilities; optimisation of operational radiation protection during remediation, particularly in areas of high ambient radiation dose

  18. Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft

    International Nuclear Information System (INIS)

    1994-09-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC section 7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado

  19. Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section}7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado.

  20. Review and action plan for oral health improvement in Sheffield special schools.

    Science.gov (United States)

    Worsley, D J; Jones, K; Harris, J C; Charlesworth, J; Marshman, Z

    2018-03-01

    A description of the process of a review of oral health improvement in special schools in Sheffield and the implementation of an action plan for these activities. Public health competencies encompassed: assessing the evidence on oral health and dental interventions, programmes and services; strategic leadership and collaborative working for health; oral health improvement. Copyright© 2018 Dennis Barber Ltd.

  1. Knowledge Transfer Plan of Action for Biomass. Working Group Technology and Knowledge August 2003 - August 2004

    International Nuclear Information System (INIS)

    Van Ree, R.; Beekes, M.L.; Knoef, H.; Koppejan, J.; Driegen, J.; Vos, R.

    2005-05-01

    As part of the title Plan of Action six working groups are involved in finding solutions to the most important bottlenecks in the market introduction of bio-energy systems. In the working group on Technology and Knowledge an overview is given of the best biomass technology/product combinations [nl

  2. Interactive noise maps for action planning in the framework of the European Noise Directive

    NARCIS (Netherlands)

    Borst, H.C.; Miedema, H.M.E.; Lohman, W.J.A.

    2007-01-01

    The European Noise Directive (END) requires assessment of noise exposures as well as the formulation of Action Plans for the reduction of the number of people harmfully affected by environmental noise. Within the framework of the project ‘Urban Strategy’, TNO has developed an interactive noise map.

  3. National Action Plan for Adverse Drug Event Prevention: Recommendations for Safer Outpatient Opioid Use.

    Science.gov (United States)

    Ducoffe, Aaron R; York, Andrew; Hu, Dale J; Perfetto, Deborah; Kerns, Robert D

    2016-12-01

    Adverse drug events (ADEs) have been highlighted as a major patient safety and public health challenge by the National Action Plan for Adverse Drug Event Prevention (ADE Action Plan), which was released by the Office of Disease Prevention and Health Promotion (ODPHP) in August 2014. The ADE Action Plan focuses on surveillance, evidence-based prevention, incentives, and oversights, additional research needs as well as possible measures and metrics to track progress of ADE prevention within three drug classes: anticoagulants, diabetes agents, and opioids.Objectives and Recommendations. With outpatient opioid prescriptions being a great concern among many healthcare providers, this article focuses on recommendations from the ADE Action Plan to help guide safer opioid use in healthcare delivery settings. Its aim is to discuss current federal methods in place to prevent opioid ADEs while also providing evidence to encourage providers and hospitals to innovate new systems and practices to increase prevention. Published by Oxford University Press on behalf of the American Academy of Pain Medicine. 2016. This work is written by US Government employees and is in the public domain in the US.

  4. Self-Efficacy, Planning and Action Control in an Oral Self-Care Intervention

    Science.gov (United States)

    Zhou, Guangyu; Sun, Caiyun; Knoll, Nina; Hamilton, Kyra; Schwarzer, Ralf

    2015-01-01

    To evaluate a theory-guided intervention on oral self-care and examine the possible mechanisms among self-regulatory factors, two brief intervention arms were compared, an information-based education treatment and a self-regulation treatment focusing on planning and action control. Young adults (N = 284; aged 18-29 years) were assessed at baseline…

  5. Action Plan and Timetable for the Implementation of the ERC's Recommendations

    CERN Document Server

    2002-01-01

    Following the External Review Committee's (ERC) Report (CERN/2444) and Council's statement after the discussions in the June 2002 Committees, the Management presents in this document an Action Plan and a time table, aiming at coherent detailing and implementation of the recommendations of the ERC

  6. Action Plan and Timetable for the Implementation of the ERC's Recommendations

    CERN Document Server

    2002-01-01

    Following the External Review Committee's (ERC) Report (CERN/2444) and Council's statement after the discussions in the June 2002 Committees, the Management presents in this document an Action Plan and a time table, aiming at coherent detailing and implementation of the recommendations of the ERC.

  7. Using Action Planning to Build Organizational Capacity for the Prevention of Intimate Partner Violence

    Science.gov (United States)

    Schober, Daniel J.; Fawcett, Stephen B.

    2015-01-01

    The DELTA PREP Project aims to reduce risk for intimate partner violence (IPV). It engaged leadership and staff from 19 statewide domestic violence coalitions in building capacity to prevent IPV before it occurs (rather than solely responding to IPV). This article describes the process and outcomes associated with action planning to create…

  8. Climate adaptive action plans to manage heat stress in Indian cities ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Climate adaptive action plans to manage heat stress in Indian cities. The Intergovernmental Panel on Climate Change estimates that rising global temperatures will increase the amount and severity of heat waves. In India, these heat waves are exacerbated by the heat generated by human activities in urban areas. This has ...

  9. The policy-practice gap: supporting national VISION 2020 action plans

    Directory of Open Access Journals (Sweden)

    An interview with Daniel Etya’ale

    2004-10-01

    Full Text Available Dr Etya'ale, can you tell us what your work involves? My job is to help countries in Africa develop and implement their national VISION 2020 action plans. This involves visiting countries and speaking with government and non-government agencies so that a well co-ordinated set of activities can be agreed.

  10. 78 FR 9028 - Notice of Availability of a Swine Brucellosis and Pseudorabies Proposed Action Plan

    Science.gov (United States)

    2013-02-07

    ...] Notice of Availability of a Swine Brucellosis and Pseudorabies Proposed Action Plan AGENCY: Animal and... brucellosis and pseudorabies available for public review and comment. Swine brucellosis and pseudorabies have...: Background Brucellosis is a contagious disease, caused by bacteria of the genus Brucella, that affects both...

  11. The role of action and coping planning in the relationship between intention and physical activity: a moderated mediation analysis.

    Science.gov (United States)

    Caudroit, Johan; Boiché, Julie; Stephan, Yannick

    2014-01-01

    Using a moderated mediation model, the present study investigated whether the mediation of intention into physical activity (PA) behaviour via action planning depends on the level of coping planning. A four-month prospective study was conducted among 157 French adults, who were recruited through a web-based survey. They were administrated measures of behavioural intention and sociodemographic variables at baseline and action and coping planning and PA four months later. Action planning partially mediated the contribution of intention on PA level. However, this indirect effect was conditional on the level of coping planning, insofar as action planning acted as a mediator of the intention-PA relationship only for individuals with high level of coping planning. The results highlight the complexity of the relationship between intention and behaviour and provide evidence for the distinct role of both forms of planning.

  12. Corrective Action Plan for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    K. B. Campbell email = campbek@nv.doe.gov

    2002-01-01

    This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for Corrective Action Unit (CAU) 262, Area 25 Septic Systems and Underground Discharge Point. CAU 262 is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996. Remediation of CAU 262 is required under the FFACO. CAU 262 is located in Area 25 of the Nevada Test Site (NTS), approximately 100 kilometers (km) (62 miles [mi]) northwest of Las Vegas, Nevada. The nine Corrective Action Sites (CASs) within CAU 262 are located in the Nuclear Rocket Development Station complex. Individual CASs are located in the vicinity of the Reactor Maintenance, Assembly, and Disassembly (R-MAD); Engine Maintenance, Assembly, and Disassembly (E-MAD); and Test Cell C compounds. CAU 262 includes the following CASs as provided in the FFACO (1996); CAS 25-02-06, Underground Storage Tank; CAS 25-04-06, Septic Systems A and B; CAS 25-04-07, Septic System; CAS 25-05-03, Leachfield; CAS 25-05-05, Leachfield; CAS 25-05-06, Leachfield; CAS 25-05-08, Radioactive Leachfield; CAS 25-05-12, Leachfield; and CAS 25-51-01, Dry Well. Figures 2, 3, and 4 show the locations of the R-MAD, the E-MAD, and the Test Cell C CASs, respectively. The facilities within CAU 262 supported nuclear rocket reactor engine testing. Activities associated with the program were performed between 1958 and 1973. However, several other projects used the facilities after 1973. A significant quantity of radioactive and sanitary waste was produced during routine operations. Most of the radioactive waste was managed by disposal in the posted leachfields. Sanitary wastes were disposed in sanitary leachfields. Septic tanks, present at sanitary leachfields (i.e., CAS 25-02-06,2504-06 [Septic Systems A and B], 25-04-07, 25-05-05,25-05-12) allowed solids to settle out of suspension prior to entering the leachfield. Posted leachfields do not contain septic tanks. All CASs located in CAU 262 are

  13. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    International Nuclear Information System (INIS)

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development

  14. Personality Traits and Training Initiation Process: Intention, Planning, and Action Initiation.

    Science.gov (United States)

    Laguna, Mariola; Purc, Ewelina

    2016-01-01

    The article aims at investigating the role of personality traits in relation to training initiation. Training initiation is conceptualized as a goal realization process, and explained using goal theories. There are three stages of the process analyzed: intention to undertake training, plan formulation, and actual training undertaking. Two studies tested the relationships between five personality traits, defined according to the five factor model, and the stages of the goal realization process. In Study 1, which explains training intention and training plans' formulation, 155 employees participated. In Study 2, which was time-lagged with two measurement points, and which explains intention, plans, and training actions undertaken, the data from 176 employees was collected at 3 month intervals. The results of these studies show that personality traits, mainly openness to experience, predict the training initiation process to some degree: intention, plans, and actual action initiation. The findings allow us to provide recommendations for practitioners responsible for human resource development. The assessment of openness to experience in employees helps predict their motivation to participate in training activities. To increase training motivation it is vital to strengthen intentions to undertake training, and to encourage training action planning.

  15. Istra district heating system. General technical report. Appendix 1 to the master plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    The objective of the master plan project is to improve the heat supply in Istra. The considerable system losses from the fuel supplied to the end-users are one issue for improvement. At the same time, the current system operation results in poor quality heat for the consumers. Due to the inflexibility of the system the dwellings/premises of the consumers are either overheated or insufficiently heated. The financial situation in Istra, the legal ownership of the district heating system and consumers' lacking ability to pay limit the possibilities for system improvements. The Master Plan and Feasibility Study evaluates four different development scenarios. Each of the scenarios is compared to the current situation in Istra, where nothing is done to change the system, but only to operate the present system in a sustainable way. The sustainable operation of the district heating system includes all necessary renovations and component replacements necessary. The project does not take into account the present financial situation in Istra, which has resulted in less maintenance than necessary. This situation is not a comparable parameter, as it is not sustainable and will lead to a breakdown of the heat supply within a short time horizon. The General Technical Report evaluates the technical situation and describes system improvements at a general level. The intention with this report is to provide important information useful to other district heating companies in Russia. (au)

  16. Learning action models to support efficient navigation planning for unmanned ground vehicles

    Science.gov (United States)

    Balac, Natasha; Gaines, Daniel M.; Thongchai, Siripun; Fisher, Doug H.; Suksakulchai, Surachai

    2001-09-01

    An effective navigation planner must have knowledge not only of the effects its actions will have, but also the effect that the environment will have on its actions (e.g. the UGV may travel more slowly over rough terrain). This is needed because the shortest path to the goal is not always the most efficient when you consider the rate of travel over the terrain. To address this issue, we have developed an approach called ERA which uses regression tree induction to learn action models that predict the effect terrain conditions will have on a UGV's navigation actions. The action models support a high level mission planner that finds efficient navigation plans consisting of way-points through which the UGV should travel. We will present results from our experiments in a simulated environment and on an RWI ATRV-Jr robot. The studies evaluate the performance of ERA in different mission scenarios with different amounts of sensor and actuator noise. Advantages of our approach include the ability to automatically learn action models, generate efficient high level navigation plans taking into account terrain conditions and transfer learned knowledge to other missions.

  17. TECHNICAL GUIDANCE DOCUMENT: CONSTRUCTION QUALITY MANAGEMENT FOR REMEDIAL ACTION AND REMEDIAL DESIGN WASTE CONTAINMENT SYSTEMS

    Science.gov (United States)

    This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. In ge...

  18. Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Grant Evenson

    2012-05-01

    Corrective Action Unit (CAU) 550 is located in Areas 7, 8, and 10 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 550, Smoky Contamination Area, comprises 19 corrective action sites (CASs). Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plumes, it was determined that some of the CAS releases are co-located and will be investigated as study groups. This document describes the planned investigation of the following CASs (by study group): (1) Study Group 1, Atmospheric Test - CAS 08-23-04, Atmospheric Test Site T-2C; (2) Study Group 2, Safety Experiments - CAS 08-23-03, Atmospheric Test Site T-8B - CAS 08-23-06, Atmospheric Test Site T-8A - CAS 08-23-07, Atmospheric Test Site T-8C; (3) Study Group 3, Washes - Potential stormwater migration of contaminants from CASs; (4) Study Group 4, Debris - CAS 08-01-01, Storage Tank - CAS 08-22-05, Drum - CAS 08-22-07, Drum - CAS 08-22-08, Drums (3) - CAS 08-22-09, Drum - CAS 08-24-03, Battery - CAS 08-24-04, Battery - CAS 08-24-07, Batteries (3) - CAS 08-24-08, Batteries (3) - CAS 08-26-01, Lead Bricks (200) - CAS 10-22-17, Buckets (3) - CAS 10-22-18, Gas Block/Drum - CAS 10-22-19, Drum; Stains - CAS 10-22-20, Drum - CAS 10-24-10, Battery. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each study group. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed

  19. Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    Evenson, Grant

    2012-01-01

    Corrective Action Unit (CAU) 550 is located in Areas 7, 8, and 10 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 550, Smoky Contamination Area, comprises 19 corrective action sites (CASs). Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plumes, it was determined that some of the CAS releases are co-located and will be investigated as study groups. This document describes the planned investigation of the following CASs (by study group): (1) Study Group 1, Atmospheric Test - CAS 08-23-04, Atmospheric Test Site T-2C; (2) Study Group 2, Safety Experiments - CAS 08-23-03, Atmospheric Test Site T-8B - CAS 08-23-06, Atmospheric Test Site T-8A - CAS 08-23-07, Atmospheric Test Site T-8C; (3) Study Group 3, Washes - Potential stormwater migration of contaminants from CASs; (4) Study Group 4, Debris - CAS 08-01-01, Storage Tank - CAS 08-22-05, Drum - CAS 08-22-07, Drum - CAS 08-22-08, Drums (3) - CAS 08-22-09, Drum - CAS 08-24-03, Battery - CAS 08-24-04, Battery - CAS 08-24-07, Batteries (3) - CAS 08-24-08, Batteries (3) - CAS 08-26-01, Lead Bricks (200) - CAS 10-22-17, Buckets (3) - CAS 10-22-18, Gas Block/Drum - CAS 10-22-19, Drum; Stains - CAS 10-22-20, Drum - CAS 10-24-10, Battery. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each study group. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed

  20. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2012-10-01

    CAU 104 comprises the following corrective action sites (CASs): • 07-23-03, Atmospheric Test Site T-7C • 07-23-04, Atmospheric Test Site T7-1 • 07-23-05, Atmospheric Test Site • 07-23-06, Atmospheric Test Site T7-5a • 07-23-07, Atmospheric Test Site - Dog (T-S) • 07-23-08, Atmospheric Test Site - Baker (T-S) • 07-23-09, Atmospheric Test Site - Charlie (T-S) • 07-23-10, Atmospheric Test Site - Dixie • 07-23-11, Atmospheric Test Site - Dixie • 07-23-12, Atmospheric Test Site - Charlie (Bus) • 07-23-13, Atmospheric Test Site - Baker (Buster) • 07-23-14, Atmospheric Test Site - Ruth • 07-23-15, Atmospheric Test Site T7-4 • 07-23-16, Atmospheric Test Site B7-b • 07-23-17, Atmospheric Test Site - Climax These 15 CASs include releases from 30 atmospheric tests conducted in the approximately 1 square mile of CAU 104. Because releases associated with the CASs included in this CAU overlap and are not separate and distinguishable, these CASs are addressed jointly at the CAU level. The purpose of this CADD/CAP is to evaluate potential corrective action alternatives (CAAs), provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 104. Corrective action investigation (CAI) activities were performed from October 4, 2011, through May 3, 2012, as set forth in the CAU 104 Corrective Action Investigation Plan.

  1. Playing Multi-Action Adversarial Games: Online Evolutionary Planning versus Tree Search

    DEFF Research Database (Denmark)

    Justesen, Niels; Mahlmann, Tobias; Risi, Sebastian

    2017-01-01

    We address the problem of playing turn-based multi-action adversarial games, which include many strategy games with extremely high branching factors as players take multiple actions each turn. This leads to the breakdown of standard tree search methods, including Monte Carlo Tree Search (MCTS......), as they become unable to reach a sufficient depth in the game tree. In this paper, we introduce Online Evolutionary Planning (OEP) to address this challenge, which searches for combinations of actions to perform during a single turn guided by a fitness function that evaluates the quality of a particular state....... We compare OEP to different MCTS variations that constrain the exploration to deal with the high branching factor in the turn-based multi-action game Hero Academy. While the constrained MCTS variations outperform the vanilla MCTS implementation by a large margin, OEP is able to search the space...

  2. Improving our legacy: Incorporation of adaptive management into state wildlife action plans

    Science.gov (United States)

    Fontaine, J.J.

    2011-01-01

    The loss of biodiversity is a mounting concern, but despite numerous attempts there are few large scale conservation efforts that have proven successful in reversing current declines. Given the challenge of biodiversity conservation, there is a need to develop strategic conservation plans that address species declines even with the inherent uncertainty in managing multiple species in complex environments. In 2002, the State Wildlife Grant program was initiated to fulfill this need, and while not explicitly outlined by Congress follows the fundamental premise of adaptive management, 'Learning by doing'. When action is necessary, but basic biological information and an understanding of appropriate management strategies are lacking, adaptive management enables managers to be proactive in spite of uncertainty. However, regardless of the strengths of adaptive management, the development of an effective adaptive management framework is challenging. In a review of 53 State Wildlife Action Plans, I found a keen awareness by planners that adaptive management was an effective method for addressing biodiversity conservation, but the development and incorporation of explicit adaptive management approaches within each plan remained elusive. Only ???25% of the plans included a framework for how adaptive management would be implemented at the project level within their state. There was, however, considerable support across plans for further development and implementation of adaptive management. By furthering the incorporation of adaptive management principles in conservation plans and explicitly outlining the decision making process, states will be poised to meet the pending challenges to biodiversity conservation. ?? 2010 .

  3. Planning for Action: The Impact of an Asthma Action Plan Decision Support Tool Integrated into an Electronic Health Record (EHR) at a Large Health Care System.

    Science.gov (United States)

    Kuhn, Lindsay; Reeves, Kelly; Taylor, Yhenneko; Tapp, Hazel; McWilliams, Andrew; Gunter, Andrew; Cleveland, Jeffrey; Dulin, Michael

    2015-01-01

    Asthma is a chronic airway disease that can be difficult to manage, resulting in poor outcomes and high costs. Asthma action plans assist patients with self-management, but provider compliance with this recommendation is limited in part because of guideline complexity. This project aimed to embed an electronic asthma action plan decision support tool (eAAP) into the medical record to streamline evidence-based guidelines for providers at the point of care, create individualized patient handouts, and evaluate effects on disease outcomes. eAAP development occurred in 4 phases: web-based prototype creation, multidisciplinary team engagement, pilot, and system-wide dissemination. Medical record and hospital billing data compared frequencies of asthma exacerbations before and after eAAP receipt with matched controls. Between December 2012 and September 2014, 5174 patients with asthma (∼10%) received eAAPs. Results showed an association between eAAP receipt and significant reductions in pediatric asthma exacerbations, including 33% lower odds of requiring oral steroids (P management plays an important role in reducing asthma exacerbations. We show the feasibility of leveraging technology to provide guideline-based decision support through an eAAP, addressing known challenges of implementation into routine practice. © Copyright 2015 by the American Board of Family Medicine.

  4. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2011-09-01

    The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclear explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of

  5. Exploring Scientific, Artistic, Moral and Technical Reflection in Teacher Action Research

    Science.gov (United States)

    Luttenberg, Johan; Oolbekkink-Marchand, Helma; Meijer, Paulien

    2018-01-01

    Reflection in action research is a complicated matter because of the many domains of reflection and most significantly, the lack of understanding of these domains of reflection in action research and how these are supported. In this paper, we propose a framework based on four domains of reflection, namely, scientific, artistic, moral and technical…

  6. The Extrastriate Body Area Computes Desired Goal States during Action Planning.

    Science.gov (United States)

    Zimmermann, Marius; Verhagen, Lennart; de Lange, Floris P; Toni, Ivan

    2016-01-01

    How do object perception and action interact at a neural level? Here we test the hypothesis that perceptual features, processed by the ventral visuoperceptual stream, are used as priors by the dorsal visuomotor stream to specify goal-directed grasping actions. We present three main findings, which were obtained by combining time-resolved transcranial magnetic stimulation and kinematic tracking of grasp-and-rotate object manipulations, in a group of healthy human participants (N = 22). First, the extrastriate body area (EBA), in the ventral stream, provides an initial structure to motor plans, based on current and desired states of a grasped object and of the grasping hand. Second, the contributions of EBA are earlier in time than those of a caudal intraparietal region known to specify the action plan. Third, the contributions of EBA are particularly important when desired and current object configurations differ, and multiple courses of actions are possible. These findings specify the temporal and functional characteristics for a mechanism that integrates perceptual processing with motor planning.

  7. Quality assurance project plan for the UMTRA technical assistance contractor hydrochemistry facility. Final report

    International Nuclear Information System (INIS)

    1993-07-01

    The Uranium Mill Tailings Remedial Action (UMTRA) hydrochemistry facility is used to perform a limited but important set of services for the UMTRA Project. Routine services include support of field-based hydrological and geochemical operations and water sampling activities. Less commonly, the hydrology and geochemistry staff undertake special studies and site characterization studies at this facility. It is also used to train hydrologists, geochemists, and groundwater sampling crews. A review of this Quality Assurance Project Plan (QAPP) shall be accomplished once each calendar year. This review will be targeted to be accomplished not sooner than 6 months and not later than 18 months after the last review

  8. City of North Vancouver greenhouse gas local action plan : final report

    International Nuclear Information System (INIS)

    This paper presented details of a greenhouse gas (GHG) local action plan developed as a result of the City of North Vancouver's participation in the Partners for Climate Protection Program (PCPP). The plan is intended to better manage the impacts of urban development related to GHG and air quality, while also achieving community objectives related to affordable housing, transportation management, job creation and economic development. The report reviewed the local emissions inventory in addition to various programs, plans, policies and by-laws relating to energy management. Potential policies and programs were identified to achieve GHG emissions reductions in accordance with the PCPP. A plan for emissions reductions was also presented. A situation analysis was presented with details of population, transportation, residential and commercial building and industry. Solid waste management and transportation plans were outlined. A GHG emissions profile and forecast was presented. An outline of a GHG management framework included information on initiatives in the city as well as details of public consultation feedback. A program implementation plan includes forecasts of the program's impact, as well as details of program delivery and a performance measurement framework. Proposed initiatives in the plan included new building guidelines; fuel switching for light and heavy duty vehicles; driver training and enhanced vehicle maintenance programs; and, an environmental procurement policy. Community programs include residential and commercial building retrofits; land use planning; support for community energy systems; green building design guidelines; transportation demand management; and, public engagement and outreach programs. 21 tabs., 9 figs

  9. Personality traits and training initiation process: Intention, planning, and action initiation

    Directory of Open Access Journals (Sweden)

    Mariola Laguna

    2016-11-01

    Full Text Available The article aims at investigating the role of personality traits in relation to training initiation. Training initiation is conceptualized as a goal realization process, and explained using goal theories. There are three stages of the process analyzed: intention to undertake training, plan formulation, and actual training undertaking. Two studies tested the relationships between five personality traits, defined according to the five factor model, and the stages of the goal realization process. In Study 1, which explains training intention and training plans’ formulation, 155 employees participated. In Study 2, which was time-lagged with two measurement points, and which explains intention, plans, and training actions undertaken, the data from 176 employees was collected at three month intervals. The results of these studies show that personality traits, mainly openness to experience, predict the training initiation process to some degree: intention, plans, and actual action initiation. The findings allow us to provide recommendations for practitioners responsible for human resource development. The assessment of openness to experience in employees helps predict their motivation to participate in training activities. To increase training motivation it is vital to strengthen intentions to undertake training, and to encourage training action planning.

  10. The Simon effect in action: planning and/or on-line control effects?

    Science.gov (United States)

    Scorolli, Claudia; Pellicano, Antonello; Nicoletti, Roberto; Rubichi, Sandro; Castiello, Umberto

    2015-07-01

    Choice reaction tasks are performed faster when stimulus location corresponds to response location (Simon effect). This spatial stimulus-response compatibility effect affects performance at the level of action planning and execution. However, when response selection is completed before movement initiation, the Simon effect arises only at the planning level. The aim of this study was to ascertain whether when a precocious response selection is requested, the Simon effect can be detected on the kinematics characterizing the online control phase of a non-ballistic movement. Participants were presented with red or green colored squares, which could appear on the right, left, above, or below a central cross. Depending on the square's color, participants had to release one of two buttons (right/left), then reach toward and press a corresponding lateral pad. We found evidence of the Simon effect on both action planning and on-line control. Moreover, the investigation of response conflict at the level of previous trials (i.e., n-1), a factor that might determine interference at the level of the current response, revealed a conflict adaptation process across trials. Results are discussed in terms of current theories concerned with the Simon effect and the distinction between action planning and control. Copyright © 2014 Cognitive Science Society, Inc.

  11. Remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 groundwater operable units' interim action

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a combination remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 Operable Units (located on the Hanford Site in Richland, Washington) interim action. The interim actions described in this document represent the first of an ongoing program to address groundwater contamination in each operable unit. This document describes the design basis, provides a description of the interim action, and identifies how they will meet the requirements set forth in the interim action Record of Decision

  12. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd{sup 3} (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3} (420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations.

  13. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    International Nuclear Information System (INIS)

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd 3 ) (2.1 million cubic meters [m 3 ]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd 3 (15,000 m 3 ) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd 3 (420,000 m 3 ). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd 3 (2.58 million m 3 ). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations

  14. Does action planning moderate the intention-habit interaction in the exercise domain? A three-way interaction analysis investigation

    NARCIS (Netherlands)

    de Bruijn, G.-J.; Rhodes, R.E.; van Osch, L.

    2012-01-01

    Both habit strength and action planning have been found to moderate the intention-exercise behaviour relationship, but no research exists that has investigated how habit strength and action planning simultaneously influence this relationship. The present study was designed to explore this issue in a

  15. Is science the driving force in the operation of environmental regimes? A case study of the Mediterranean Action Plan

    NARCIS (Netherlands)

    Frantzi, Sofia; Lovett, Jonathan Cranidge

    2008-01-01

    This study examines the role of science in the operation of environmental regimes using the Barcelona Convention/Mediterranean Action Plan (MAP) as a case study. The ‘epistemic communities’ theory suggests that emergence of the Mediterranean Action Plan was largely driven by scientific experts. In

  16. Is science the driving force in the operation of environmental regimes? A case study of the Mediterranean Action Plan

    NARCIS (Netherlands)

    Frantzi, S.; Lovett, J.C.

    2008-01-01

    This study examines the role of science in the operation of environmental regimes using the Barcelona Convention/Mediterranean Action Plan (MAP) as a case study. The 'epistemic communities' theory suggests that emergence of the Mediterranean Action Plan was largely driven by scientific experts. In

  17. Method for Measuring the Alignment Between Information Technology Strategic Planning and Actions of Information Technology Governance

    Directory of Open Access Journals (Sweden)

    Lúcio Melre da Silva

    2014-10-01

    Full Text Available The purpose of this research is to present a method for measuring the degree of alignment between Strategic Planning and Information Technology Management practices and Information Technology Governance. A survey of IT governance maturity at the High Courts and the Supreme Court was carried out in order to reach this aim. The Attribute Table of the COBIT 4.1 was used both as a model for maturity analysis as for the degree of alignment of IT strategic plans of these bodies with the IT Strategic Planning established by the National Judiciary Council (CNJ. It was assessed the maturity of thirty four processes, according to six attributes, in the four COBIT domains. The proposed method, named COMPLAN-GTI, allows the linking of the guidelines of the strategic planning to the COBIT processes. The field research above mentioned shows that the alignment between the planning established by the CNJ and those established by the High Courts and Supreme Court is around 68%, leading to the conclusion that the policies and actions established by the National Council of Justice for the Judiciary are being followed. The application of the method is also used to confirm whether the management practices and the IT Governance are consistent with the strategic plan established by the organization. It was observed in the research carried out in the Courts that the average convergence between PETIs and management practices and Governance lies around 70%, leading to the conclusion that the strategic plans exerted influence on the action planning of these organizations.

  18. Student-Faculty Interactions about Disappointing Grades: Application of the Goals-Plans-Actions Model and the Theory of Planned Behavior

    Science.gov (United States)

    Henningsen, Mary Lynn Miller; Valde, Kathleen S.; Russell, Gregory A.; Russell, Gregory R.

    2011-01-01

    The goals-plans-actions model and the theory of planned behavior were used to predict what lead to students having a conversation about a disappointing grade with a faculty member. Participants (N = 130) completed two surveys. In the first survey, participants completed measures of primary and secondary goals, planning, decision to engage,…

  19. Quebec and climate change : 2006-2012 action plan first year results

    International Nuclear Information System (INIS)

    2007-06-01

    This brochure was released by the Quebec government in order to provide the first year results of the Quebec and Climate Change Action Plan. The plan implemented 24 actions for the reduction of greenhouse gas (GHG) emissions. The measures are expected to reduce emissions by 10 megatonnes by 2012. A federal government grant of $350 million is also being used to reduce GHGs by a further 3.8 megatonnes. A $1.2 billion budget has been financed through a duty levied on fossil fuels. The plan included a comprehensive energy efficiency and new technologies program; programs to encourage marine transport as well as a program to develop innovative public transportation initiatives. The plan also included the creation of an industrial research chair in cellulose ethanol as well as 2 demonstration plants for the production of cellulose ethanol. A program has also been introduced to support municipalities who wish to adopt bylaws prohibiting vehicle idling. A draft regulation has also been prepared concerning the mandatory reporting of releases of contaminants into the atmosphere. The plan will include awareness raising and assistance activities. Funding has also been given to the development of local climate models. It was concluded that the Quebec government is preparing to meet the environmental challenges of the future. 4 figs

  20. 'Affordable' death in the United States: an action plan based on lessons learned from the Nursing Economic$ special issue.

    Science.gov (United States)

    Kovner, Christine T; Lusk, Edward; Selander, Nellie M

    2012-01-01

    An eight-point action plan is proposed for lowering costs associated with end-of-life health care in the United States, as well as improving the quality of life experienced by patients and their families. This action plan was derived from an analysis of the six articles presented in this special issue of Nursing Economic$. The two major features of this action plan are: (a) expansion of hospice and palliative care, as well as (b) increased use of advance directives. Additionally, as pre-conditions for the effective operation of this action plan, the political, cultural, and legislative contexts that merit attention are discussed. Finally, arguments as to the desirability, feasibility, and sustainability of this action plan are offered.