  1. Kennedy Space Center Orion Processing Team Planning for Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis

  2. Bechtel Hanford, Inc./ERC team health and safety plan Environmental Restoration Disposal Facility operations

    International Nuclear Information System (INIS)

    Turney, S.R.

    1996-02-01

    A comprehensive safety and health program is essential for reducing work-related injuries and illnesses while maintaining a safe and health work environment. This document establishes Bechtel Hanford, Inc. (BHI)/Environmental Restoration Contractor (ERC) team requirements, policies, and procedures and provides preliminary guidance to the Environmental Restoration Disposal Facility (ERDF) subcontractor for use in preparing essential safety and health documents. This health and safety plan (HASP) defines potential safety and health issues associated with operating and maintaining the ERDF. A site-specific HASP shall be developed by the ERDF subcontractor and shall be implemented before operations and maintenance work can proceed. An activity hazard analysis (AHA) shall also be developed to provide procedures to identify, assess, and control hazards or potential incidents associated with specific operations and maintenance activities

  3. Planning for high performance project teams

    International Nuclear Information System (INIS)

    Reed, W.; Keeney, J.; Westney, R.

    1997-01-01

    Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects

  4. The Planning Task for Teams (PLATT): An environment for research on planning and decision making in teams

    NARCIS (Netherlands)

    Kamphuis, W.; Houttuin, K.

    2007-01-01

    In this report, we introduce a newly developed task environment for experimental team research: the Planning Task for Teams (PLATT). PLATT is a scenario based, computerized, complex planning task for three-person teams. PLATT has been designed to be able to do experimental laboratory research on

  5. MRP (materiel requirements planning) II education: a team-building experience.

    Science.gov (United States)

    Iemmolo, G R

    1994-05-01

    Conestoga Wood Specialties, a leader in the woodworking industry, is constantly striving for continuous improvement in manufacturing and service. Recently, the company embarked on a major MRP II education effort that served as a framework for team building. This team building concept has carried over into other aspects related to the business, such as the formalization of the sales and operations planning meeting. At Conestoga Wood, it is recognized that successful team building is necessary to achieve and maintain world-class performance.

  6. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  7. Shuttle operations era planning for flight operations

    Science.gov (United States)

    Holt, J. D.; Beckman, D. A.

    1984-01-01

    The Space Transportation System (STS) provides routine access to space for a wide range of customers in which cargos vary from single payloads on dedicated flights to multiple payloads that share Shuttle resources. This paper describes the flight operations planning process from payload introduction through flight assignment to execution of the payload objectives and the changes that have been introduced to improve that process. Particular attention is given to the factors that influence the amount of preflight preparation necessary to satisfy customer requirements. The partnership between the STS operations team and the customer is described in terms of their functions and responsibilities in the development of a flight plan. A description of the Mission Control Center (MCC) and payload support capabilities completes the overview of Shuttle flight operations.

  8. NASA deep space network operations planning and preparation

    Science.gov (United States)

    Jensen, W. N.

    1982-01-01

    The responsibilities and structural organization of the Operations Planning Group of NASA Deep Space Network (DSN) Operations are outlined. The Operations Planning group establishes an early interface with a user's planning organization to educate the user on DSN capabilities and limitations for deep space tracking support. A team of one or two individuals works through all phases of the spacecraft launch and also provides planning and preparation for specific events such as planetary encounters. Coordinating interface is also provided for nonflight projects such as radio astronomy and VLBI experiments. The group is divided into a Long Range Support Planning element and a Near Term Operations Coordination element.

  9. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems

  10. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  11. Automated Planning and Scheduling for Planetary Rover Distributed Operations

    Science.gov (United States)

    Backes, Paul G.; Rabideau, Gregg; Tso, Kam S.; Chien, Steve

    1999-01-01

    Automated planning and Scheduling, including automated path planning, has been integrated with an Internet-based distributed operations system for planetary rover operations. The resulting prototype system enables faster generation of valid rover command sequences by a distributed planetary rover operations team. The Web Interface for Telescience (WITS) provides Internet-based distributed collaboration, the Automated Scheduling and Planning Environment (ASPEN) provides automated planning and scheduling, and an automated path planner provided path planning. The system was demonstrated on the Rocky 7 research rover at JPL.

  12. Building a team through a strategic planning process.

    Science.gov (United States)

    Albert, Debra; Priganc, Dave

    2014-01-01

    Strategic planning is a process often left to senior hospital leadership, with limited input from unit-level, bedside patient care providers. This frequent approach to strategic planning misses the opportunity to engage a wide range of employees, build a shared sense of commitment, produce a collaborative team environment, and to generate greater acceptance of the plan. The Patient Care Services division at the University of Chicago Medicine used a strategic planning process that incorporated 360-degree input from both within the Patient Care Services division and outside of the division. The result is a strategic vision and plan that, shaped by broad-based input from both internal and external constituencies, is strengthened by the team that emerged from the process. Through the process of identifying a common understanding of the group's future direction, a shared purpose was created that transcended traditional professional boundaries and shaped a cohesive team focused on effective and efficient patient care. Now, with a focused strategic plan and a team centered on a shared purpose, the team is beginning to effectively deliver on the plan.

  13. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs

  14. Strategic Team AI Path Plans: Probabilistic Pathfinding

    Directory of Open Access Journals (Sweden)

    Tng C. H. John

    2008-01-01

    Full Text Available This paper proposes a novel method to generate strategic team AI pathfinding plans for computer games and simulations using probabilistic pathfinding. This method is inspired by genetic algorithms (Russell and Norvig, 2002, in that, a fitness function is used to test the quality of the path plans. The method generates high-quality path plans by eliminating the low-quality ones. The path plans are generated by probabilistic pathfinding, and the elimination is done by a fitness test of the path plans. This path plan generation method has the ability to generate variation or different high-quality paths, which is desired for games to increase replay values. This work is an extension of our earlier work on team AI: probabilistic pathfinding (John et al., 2006. We explore ways to combine probabilistic pathfinding and genetic algorithm to create a new method to generate strategic team AI pathfinding plans.

  15. Information delivery in team communication of MCR operators for an emergency task

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Kwang Sub; Park, Jin Kyun; Jung, Won Dae

    2005-01-01

    Team performance is a major measure to evaluate the ability of team when a lot of people perform a task of common purpose such as the main control room operators in the nuclear power plant. A team performance is affected the collaboration and communication among operators under dynamic situation as well as by the cognitive process of each team member. Specially, under the emergency situation, more clear and apparent communication in a team is a critical key for the appropriate response to emergency situation. As a general human factor analysis accesses the operator's behavior, it leads to a resulting action of planning, decision, problem-solving. In order to access the internal information and background information of his/her behavior, the verbal protocol analysis is applied. The impact factors on the team performance are derived from the state of the art for team performance, and it is found that the communication is a common key for all impact factors. And, in turn, the impact factors for the communication are accesses and the more detailed analysis is performed. The recorded data for the operator training for emergency situation of nuclear power plant training center are analyzed according to the verbal protocol analysis that are being generally utilized in cognitive psychology, educational psychology, and cognitive science. Two aspects, external (syntax) and internal (symantic) aspects of communication are reviewed. From the syntax analysis, it is found that the task of each step in EOP is separated according to each corresponding operator and the ordinary training is important, and the weak-points for a sentence presentation can be found team-by-team. And, from the symantic analysis for the diagnostic procedure of EOP is performed and the communication errors due to different situation awareness by operators could be found, and it lead to a diagnosis failure. The factors for different symantic cognition for a situation are analyzed and the affecting

  16. NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning

  17. Final Action Plan to Tiger Team

    International Nuclear Information System (INIS)

    1992-01-01

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit

  18. IAEA Operational Safety Team (OSART) Reviews Progress at Fessenheim Nuclear Power Plant, France

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has evaluated the French Nuclear Power Plant (NPP) at Fessenheim to assess how the facility has followed up on an Operational Safety Review Team (OSART) mission undertaken in 2009. The IAEA assembled a team of experts at the request of the Government of France to conduct the mission. Follow-up missions are standard components of the OSART programme and are conducted 18-24 months after the initial OSART mission. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the team performed its review from 7 to 11 February 2011. The team assessed how the Fessenheim NPP has addressed the recommendations and suggestions made during the 2009 OSART mission. The team was made up of experts from Slovakia, Switzerland and the IAEA. The review covered the areas of Management, Organization and Administration; Training and Qualifications; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry and Emergency Planning and Preparedness. The conclusions of the follow-up review are based on the IAEA's Safety Standards and proven good international practices. There were 21 issues raised by the 2009 mission. During the follow-up mission, the team assessed that six issues had been resolved, thirteen had made satisfactory progress to date and two had made insufficient progress to date. 'Resolved' describes action plans for improvement that have been fully implemented; 'satisfactory progress to date' describes action plans that have been developed but are not yet fully implemented; and 'insufficient progress to date' describes situations where additional consideration or strengthening of improvement plans is necessary. Examples of issues falling into different resolution categories include: The plant has resolved the suggestion to establish a process to review initial training materials on a regular basis

  19. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment. Volume 1, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  20. Distinguishing between taskwork and teamwork planning in teams: relations with coordination and interpersonal processes.

    Science.gov (United States)

    Fisher, David M

    2014-05-01

    Planning in teams represents a critical process that lays the groundwork for effective team functioning. The current investigation examined whether emergent team planning can be meaningfully characterized in terms of a distinction between planning that focuses on taskwork and planning that focuses on teamwork. In Study 1, items written to reflect commonly identified indicators of team planning were subjected to an exploratory factor analysis. In Study 2, slightly modified items were provided to a separate sample, and a confirmatory factor analysis was conducted. In Study 3, the relationships between the different forms of planning and other team processes (i.e., coordination, interpersonal processes) were examined in order to determine whether there are unique relationships for task-focused and team-focused planning. Results from the first 2 studies provided support for a 2-factor structure of team planning, whereas Study 3 found independent relationships for taskwork and teamwork planning with subsequent team processes. Both forms of planning also exhibited indirect relationships with team performance via the mediating role of subsequent team processes. (c) 2014 APA, all rights reserved.

  1. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    Science.gov (United States)

    Hall, Timothy A.

    2011-01-01

    In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow

  2. Mission control team structure and operational lessons learned from the 2009 and 2010 NASA desert RATS simulated lunar exploration field tests

    Science.gov (United States)

    Bell, Ernest R.; Badillo, Victor; Coan, David; Johnson, Kieth; Ney, Zane; Rosenbaum, Megan; Smart, Tifanie; Stone, Jeffry; Stueber, Ronald; Welsh, Daren; Guirgis, Peggy; Looper, Chris; McDaniel, Randall

    2013-10-01

    The NASA Desert Research and Technology Studies (Desert RATS) is an annual field test of advanced concepts, prototype hardware, and potential modes of operation to be used on human planetary surface space exploration missions. For the 2009 and 2010 NASA Desert RATS field tests, various engineering concepts and operational exercises were incorporated into mission timelines with the focus of the majority of daily operations being on simulated lunar geological field operations and executed in a manner similar to current Space Shuttle and International Space Station missions. The field test for 2009 involved a two week lunar exploration simulation utilizing a two-man rover. The 2010 Desert RATS field test took this two week simulation further by incorporating a second two-man rover working in tandem with the 2009 rover, as well as including docked operations with a Pressurized Excursion Module (PEM). Personnel for the field test included the crew, a mission management team, engineering teams, a science team, and the mission operations team. The mission operations team served as the core of the Desert RATS mission control team and included certified NASA Mission Operations Directorate (MOD) flight controllers, former flight controllers, and astronaut personnel. The backgrounds of the flight controllers were in the areas of Extravehicular Activity (EVA), onboard mechanical systems and maintenance, robotics, timeline planning (OpsPlan), and spacecraft communicator (Capcom). With the simulated EVA operations, mechanized operations (the rover), and expectations of replanning, these flight control disciplines were especially well suited for the execution of the 2009 and 2010 Desert RATS field tests. The inclusion of an operations team has provided the added benefit of giving NASA mission operations flight control personnel the opportunity to begin examining operational mission control techniques, team compositions, and mission scenarios. This also gave the mission operations

  3. Spent Nuclear Fuel Project operational staffing plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1996-03-01

    Using the Spent Nuclear Fuel (SNF) Project's current process flow concepts and knowledge from cognizant engineering and operational personnel, an initial assessment of the SNF Project radiological exposure and resource requirements was completed. A small project team completed a step by step analysis of fuel movement in the K Basins to the new interim storage location, the Canister Storage Building (CSB). This analysis looked at fuel retrieval, conditioning of the fuel, and transportation of the fuel. This plan describes the staffing structure for fuel processing, fuel movement, and the maintenance and operation (M ampersand O) staffing requirements of the facilities. This initial draft does not identify the support function resources required for M ampersand O, i.e., administrative and engineering (technical support). These will be included in future revisions to the plan. This plan looks at the resource requirements for the SNF subprojects, specifically, the operations of the facilities, balances resources where applicable, rotates crews where applicable, and attempts to use individuals in multi-task assignments. This plan does not apply to the construction phase of planned projects that affect staffing levels of K Basins

  4. IAEA Sets Up Team to Drive Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: The International Atomic Energy Agency is setting up a Nuclear Safety Action Team to oversee prompt implementation of the IAEA Action Plan on Nuclear Safety and ensure proper coordination among all stakeholders. The 12-point Action Plan, drawn up in the wake of the Fukushima Daiichi accident, was approved by the Agency's Board of Governors on 13 September and endorsed by all 151 Member States at its General Conference last week. The team will work within the Agency's Department of Nuclear Safety and Security, headed by Deputy Director General Denis Flory, and will coordinate closely with the Director General's Office for Policy. ''The Action Plan requires immediate follow-up,'' Director General Yukiya Amano said. ''This compact, dedicated team will assist Deputy Director General Flory in implementing the measures agreed in the Action Plan.'' Gustavo Caruso, Head of the Regulatory Activities Section in the IAEA's Division of Installation Safety, has been designated as the team's Special Coordinator for the implementation of the Action Plan. The IAEA has already started implementing its responsibilities under the Action Plan, including development of an IAEA methodology for stress tests for nuclear power plants. The methodology will be ready in October. (IAEA)

  5. Integrated Hatchery Operations Team: Policies and Procedures for Columbia Basin Anadromous Salmonid Hatcheries, 1994 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Integrated Hatchery Operations Team (Northwest Power Planning Council, Portland, OR)

    1995-01-01

    This document outlines regional policies and procedures for hatchery operations in the Columbia River Basin. The purpose of these policies is to provide regional guidelines by which all anadromous fish hatcheries will be operated. These policies will be adopted by the fisheries co-managers, and will provide guidance to operate hatcheries in an efficient and biologically sound manner. The hatchery policies presented in this manual are not intended to establish production priorities. Rather, the intent is to guide hatchery operations once production numbers are established. Hatchery operations discussed in this report include broodstock collection, spawning, incubation of eggs, fish rearing and feeding, fish release, equipment maintenance and operations, and personnel training. Decisions regarding production priorities must be provided by fishery managers through a comprehensive plan that addresses both natural and hatchery fish production. The Integrated Hatchery Operations Team is a multi-agency group called for by the Northwest Power Planning Council. This team was directed to develop new basinwide policies for managing and operating all existing and future anadromous fish hatcheries in the Columbia River Basin. The parties pledge to confer with each other and to use their authorities and resources to accomplish these mutually acceptable hatchery practices.

  6. International Thermonuclear Experimental Reactor U.S. Home Team Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Sowder, W. K.

    1998-10-01

    The International Thermonuclear Experimental Reactor (ITER) project is unique in that the work is divided among an international Joint Central Team and four Home Teams, with the overall responsibility for the quality of activities performed during the project residing with the ITER Director. The ultimate responsibility for the adequacy of work performed on tasks assigned to the U.S. Home Team resides with the U.S. Home Team Leader and the U.S. Department of Energy Office of Fusion Energy (DOE-OFE). This document constitutes the quality assurance plan for the ITER U.S. Home Team. This plan describes the controls exercised by U.S. Home Team management and the Performing Institutions to ensure the quality of tasks performed and the data developed for the Engineering Design Activities assigned to the U.S. Home Team and, in particular, the Research and Development Large Projects (7). This plan addresses the DOE quality assurance requirements of 10 CFR 830.120, "Quality Assurance." The plan also describes U.S. Home Team quality commitments to the ITER Quality Assurance Program. The ITER Quality Assurance Program is based on the principles described in the International Atomic Energy Agency Standard No. 50-C-QA, "Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Facilities." Each commitment is supported with preferred implementation methodology that will be used in evaluating the task quality plans to be submitted by the Performing Institutions. The implementing provisions of the program are based on guidance provided in American National Standards Institute/American Society of Mechanical Engineers NQA-1 1994, "Quality Assurance." The individual Performing Institutions will implement the appropriate quality program provisions through their own established quality plans that have been reviewed and found to comply with U.S. Home Team quality assurance plan commitments to the ITER Quality Assurance Program. The extent of quality program provisions

  7. Operation planning device

    International Nuclear Information System (INIS)

    Watanabe, Takashi; Odakawa, Naoto; Erikuchi, Makoto; Okada, Masayuki; Koizumi, Atsuhiko.

    1996-01-01

    The device of the present invention provides a device suitable for monitoring a reactor core state and operation replanning in terms of reactor operation. Namely, (1) an operation result difference judging means judges that replanning is necessary when the operation results deviates from the operation planning, (2) an operation replanning rule data base storing means stores a deviation key which shows various kinds of states where the results deviate from the planning and a rule for replanning for returning to the operation planning on every deviating key, (3) an operation replanning means forms a new operation planning in accordance with the rule which is retrieved based on the deviation key, (4) an operation planning optimizing rule data base storing means evaluates the reformed planning and stores it on every evaluation item, (5) an operation planning optimization means correct the operation planning data so as to be optimized when the evaluation of the means (4) is less than a reference value, and (6) an operation planning display means edits adaptable operation planning data and the result of the evaluation and displays them. (I.S.)

  8. NIF Operations Management Plan, August 2011

    Energy Technology Data Exchange (ETDEWEB)

    Van Wonterghem, Bruno M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States). National Ignition Facility (NIF)

    2014-01-30

    Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in the laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the

  9. Improved ant Colony Optimization for Virtual Teams Building in Collaborative Process Planning

    Directory of Open Access Journals (Sweden)

    Yingying Su

    2014-02-01

    Full Text Available Virtual teams have been adopted by organizations to gain competitive advantages in this global economy. Virtual teams are a ubiquitous part of getting work done in almost every organization. For the purpose of building virtual teams in collaborative process planning, the method based on improved ant colony algorithm (IMACO was proposed. The concept of virtual team was illustrated and the necessity of building virtual teams in collaborative process planning was analyzed. The sub tasks with certain timing relationship were described and the model of building virtual teams in collaborative process planning was established, which was solved by improved ant colony algorithm. In this paper applications of the IMACO and ACO are compared and demonstrate that the use of the IMACO algorithm performs better. An example was studied to illustrate the effectiveness of the strategy.

  10. Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Allwine, K Jerry; Flaherty, Julia E.

    2007-08-01

    This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.

  11. The work of the Operational Safety Review Team (OSART)

    International Nuclear Information System (INIS)

    Hide, K.W.

    1996-01-01

    The Operational Safety Review Team (OSART) programme was set up by the IAEA in 1982 to assist Member States to enhance the operational safety of nuclear power plants. Each team is staffed by senior experts in the relevant fields. The review team discusses with plant staff the existing operational programmes for plant which may be under construction, being commissioned or already operating. Following a detailed examination of a safety programme, the OSART team lists strengths and weaknesses and makes recommendations on how to overcome the latter. Since their conclusions are based on the best prevailing international practice, they may be more stringent than those based on national criteria. The results of the 77 missions conducted at 62 plants in 28 countries by the end of 1994 are summarised. (UK)

  12. IAEA Operational Safety Team Reviews Cattenom Nuclear Power Plant

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts led by the International Atomic Energy Agency (IAEA) has reviewed operational safety at France's Cattenom Nuclear Power Plant (NPP) noting a series of good practices as well as recommendations and suggestions to reinforce them. The IAEA assembled an international team of experts at the request of the Government of France to conduct an Operational Safety Review (OSART) of Cattenom NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 14 November to 1 December 2011. The team was made up of experts from Belgium, the Czech Republic, Finland, Germany, Hungary, Japan, Russia, Slovakia, South Africa, Sweden, Ukraine, the United Kingdom and the IAEA. The team at Cattenom conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; Emergency Planning and Preparedness; and Severe Accident Management. Cattenom is the first plant in Europe to voluntarily undertake a Severe Accident Management review during an OSART review. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: Sheets are displayed in storage areas where combustible material is present - these sheets are updated readily and accurately by the area owner to ensure that the fire limits are complied with; A simple container is attached to the neutron source handling device to ensure ease and safety of operations and reduce possible radiation exposure during use

  13. A proposal for operator team behavior model and operator's thinking mechanism

    International Nuclear Information System (INIS)

    Yoshimura, Seiichi; Takano, Kenichi; Sasou, Kunihide

    1995-01-01

    Operating environment in huge systems like nuclear power plants or airplanes is changing rapidly with the advance of computer technology. It is necessary to elucidate thinking process of operators and decision-making process of an operator team in abnormal situations, in order to prevent human errors under such environment. The Central Research Institute of Electric Power Industry is promoting a research project to establish human error prevention countermeasures by modeling and simulating the thinking process of operators and decision-making process of an operator team. In the previous paper, application of multilevel flow modeling was proposed to a mental model which conducts future prediction and cause identification, and the characteristics were verified by experienced plant operators. In this paper, an operator team behavior model and a fundamental operator's thinking mechanism especially 'situation understanding' are proposed, and the proposals are evaluated by experiments using a full-scale simulator. The results reveal that some assumptions such as 'communication is done between a leader and a follower' are almost appropriate and that the situation understanding can be represented by 'probable candidates for cause, determination of a parameter which changes when an event occurs, determination of parameters which are influenced by the change of the previous parameter, determination of a principal parameter and future prediction of the principal parameter'. (author)

  14. IAEA Operational Safety Team Reviews Saint-Alban Nuclear Power Plant, France

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed safety practices at France's Saint-Alban Nuclear Power Plant (NPP) and has highlighted a set of strong practices as well as a series of recommendations to reinforce them. The IAEA assembled the team at the request of the Government of France to conduct an Operational Safety Review (OSART) of the Saint-Alban NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review from 20 September to 6 October 2010. The team was made up of experts from Belgium, Canada, the Czech Republic, Germany, Lithuania, the Netherlands, Slovakia, Sweden and the USA. An OSART mission is designed to review programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at Saint-Alban conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely are under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; and Emergency Planning and Preparedness. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: A safety guideline for outages; The use of remote video surveillance of fuel inspection and handling activities; A motivational tool for plant staff regarding the benefits of operating experience and associated corrective actions; and Use of a sophisticated key control system

  15. IAEA Operational Safety Team Review Bohunice Nuclear Power Plant, Slovak Republic

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed Slovakia's Bohunice Nuclear Power Plant (BNPP) for its safety practices and has noted a series of good practices as well as recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of Slovak Republic to conduct an Operational Safety Review (OSART) of Bohunice NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the OSART team performed an in-depth operational safety review from 1 to 18 November 2010. The team was made up of experts from Belgium, Canada, China, the Czech Republic, France, Sweden, the United Kingdom and the IAEA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at BNPP conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely is under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry and Emergency Planning and Preparedness. Long Term Operation assessment has been requested by the plant in addition to the standard OSART program. The OSART team has identified good plant practices which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: BNPP has implemented a comprehensive set of technical and organizational measures which have significantly reduced the production of liquid radioactive waste; BNPP has developed an automatic transfer of dosimetry data

  16. Systematic evaluation of nuclear operator team skills training

    International Nuclear Information System (INIS)

    Harrington, D.K.; Kello, J.E.

    1991-01-01

    In recent years, the nuclear industry has increasingly recognized with the technical training given its control room operators. As yet, however, little has been done to determine the actual effectiveness of such nontechnical training. Thus, the questions of how team training should be carried out for maximum impact on the safety and efficiency of control room operation and just what the benefits of such training might be remain open. We are in the early stages of establishing a systematic evaluation process that will help nuclear utilities assess the effectiveness of their existing team skills training programs for control room operators. Research focuses on defining the specific behavioral and attitudinal objectives of team skills training. Simply put, what does good practice look like and sound like in the control room environment? What specific behaviors and attitudes should the training be directed toward? Obviously, the answers to the questions have clear implications for the design of nuclear team skills training programs

  17. Study on team evaluation (4). Reliability and validity of questionnaire survey-based team work evaluation method of power plant operator team

    International Nuclear Information System (INIS)

    Sasou, Kunihide; Hirose, Ayako; Misawa, Ryou; Yamaguchi, Hiroyuki

    2006-01-01

    The series of this study describes the necessity of the evaluation of team work from two aspects of operator's behavior and operators' mind. The authors propose Team Work Element Model which consists of necessary elements to build high performance team. This report discusses a method to evaluate team work from the second aspect, that is, competency trust, competition, for-the team spirit, etc. The authors survey the previous studies on psychological measures and organize a set of questions to evaluate 10 team work sub elements that are the parts of Team Work Element Model. The factor analysis shows that this set of questions is consists of 13 factors such as task-oriented leadership, harmony-oriented team atmosphere, etc. Close examination of the questions in each factor shows that 8 of 10 team work sub elements can be evaluated by this questionnaire. In addition, this questionnaire comprises scales additional 8 scales such as job satisfaction, leadership, etc. As a result, it is possible to evaluate team work from more comprehensive view points. (author)

  18. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    Science.gov (United States)

    Hall, Timothy A.; Clancey, William J.; McDonald, Aaron; Toschlog, Jason; Tucker, Tyson; Khan, Ahmed; Madrid, Steven (Eric)

    2011-01-01

    In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.

  19. The importance of team functioning to natural resource planning outcomes.

    Science.gov (United States)

    Stern, Marc J; Predmore, S Andrew

    2012-09-15

    In its recent history, the U.S. Forest Service is among many federal land management agencies struggling with questions concerning why its planning procedures are sometimes inefficient, perform poorly in the eyes of the public, and fail to deliver outputs that advance agency mission. By examining a representative sample of National Environmental Policy Act (NEPA) processes conducted by the agency between 2007 and 2009, we provide new insights into what drives outcomes in these planning processes. We examined team leaders' perceptions of the following outcomes: achievement of agency goals and NEPA mandates, process efficiency, public relations, and team outcomes. The most consistently important predictors of positive outcomes were team harmony and a clearly empowered team leader. Other factors, such as perceptions of the use of best science, a clear and unambiguous purpose and need, team turnover (personnel changes during the process), extra-agency engagement, and intra-agency relations, were also important, but played a less consistent role. The findings suggest the importance of empowering team leaders and team members through enhancing elements of discretion, responsibility, clear role definition, collaborative interdisciplinary deliberation, and perceived self-efficacy. The results also suggest the importance of genuine concern and respect for participating publics and effective inter-agency coordination. Copyright © 2012 Elsevier Ltd. All rights reserved.

  20. Team Learning: Through the Relational Dynamics of Co-operation and Rivalry in Team Communities

    OpenAIRE

    Lotz, Maja

    2008-01-01

    In this paper I explore the constructive links between co-operation, rivalry, and learning within the structure of team communities. Drawing upon social learning theory, the main purpose of this paper is to argue that both co-operation and rivalry are important triggers for mobilizing learning processes within and between teams. However, social learning theory tends to disregard the positive aspects of rivalry. Consequently, this paper will argue for the need to extend social learning theory ...

  1. Operations planning and analysis handbook for NASA/MSFC phase B development projects

    Science.gov (United States)

    Batson, Robert C.

    1986-01-01

    Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.

  2. Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

    Science.gov (United States)

    Equils, Douglas J.

    2008-01-01

    Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of

  3. [Social representation of a healthcare team on family planning and female sterilization].

    Science.gov (United States)

    Marcolino, Clarice

    2004-12-01

    The objective in this qualitative study was to obtain the discourse of the members of a healthcare team on family planning and female sterilization, and those practical effects on the work of the team. Marxist dialectic and social representations were used as references. Data were obtained by interviews and observations of certain activities of the members of the healthcare team and were subjected to analysis of the discourse. Family planning and female sterilization were considered to be rights, which pertained to the women, although the exercise of those rights is hindered by the limitations of access to contraceptive methods in general.

  4. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    Science.gov (United States)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Danny

    2008-01-01

    The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team

  5. Team performance measures for abnormal plant operations

    International Nuclear Information System (INIS)

    Montgomery, J.C.; Seaver, D.A.; Holmes, C.W.; Gaddy, C.D.; Toquam, J.L.

    1990-01-01

    In order to work effectively, control room crews need to possess well-developed team skills. Extensive research supports the notion that improved quality and effectiveness are possible when a group works together, rather than as individuals. The Nuclear Regulatory Commission (NRC) has recognized the role of team performance in plant safety and has attempted to evaluate licensee performance as part of audits, inspections, and reviews. However, reliable and valid criteria for team performance have not yet been adequately developed. The purpose of the present research was to develop such reliable and valid measures of team skills. Seven dimensions of team skill performance were developed on the basis of input from NRC operator licensing examiners and from the results of previous research and experience in the area. These dimensions included two-way communications, resource management, inquiry, advocacy, conflict resolution/decision-making, stress management, and team spirit. Several different types of rating formats were developed for use with these dimensions, including a modified Behaviorally Anchored Rating Scale (BARS) format and a Behavioral Frequency format. Following pilot-testing and revision, observer and control room crew ratings of team performance were obtained using 14 control room crews responding to simulator scenarios at a BWR and a PWR reactor. It is concluded, overall, that the Behavioral Frequency ratings appeared quite promising as a measure of team skills but that additional statistical analyses and other follow-up research are needed to refine several of the team skills dimensions and to make the scales fully functional in an applied setting

  6. Individual versus interprofessional team performance in formulating care transition plans: A randomised study of trainees from five professional groups.

    Science.gov (United States)

    Farrell, Timothy W; Supiano, Katherine P; Wong, Bob; Luptak, Marilyn K; Luther, Brenda; Andersen, Troy C; Wilson, Rebecca; Wilby, Frances; Yang, Rumei; Pepper, Ginette A; Brunker, Cherie P

    2018-05-01

    Health professions trainees' performance in teams is rarely evaluated, but increasingly important as the healthcare delivery systems in which they will practice move towards team-based care. Effective management of care transitions is an important aspect of interprofessional teamwork. This mixed-methods study used a crossover design to randomise health professions trainees to work as individuals and as teams to formulate written care transition plans. Experienced external raters assessed the quality of the written care transition plans as well as both the quality of team process and overall team performance. Written care transition plan quality did not vary between individuals and teams (21.8 vs. 24.4, respectively, p = 0.42). The quality of team process did not correlate with the quality of the team-generated written care transition plans (r = -0.172, p = 0.659). However, there was a significant correlation between the quality of team process and overall team performance (r = 0.692, p = 0.039). Teams with highly engaged recorders, performing an internal team debrief, had higher-quality care transition plans. These results suggest that high-quality interprofessional care transition plans may require advance instruction as well as teamwork in finalising the plan.

  7. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  8. Surgical team turnover and operative time: An evaluation of operating room efficiency during pulmonary resection.

    Science.gov (United States)

    Azzi, Alain Joe; Shah, Karan; Seely, Andrew; Villeneuve, James Patrick; Sundaresan, Sudhir R; Shamji, Farid M; Maziak, Donna E; Gilbert, Sebastien

    2016-05-01

    Health care resources are costly and should be used judiciously and efficiently. Predicting the duration of surgical procedures is key to optimizing operating room resources. Our objective was to identify factors influencing operative time, particularly surgical team turnover. We performed a single-institution, retrospective review of lobectomy operations. Univariate and multivariate analyses were performed to evaluate the impact of different factors on surgical time (skin-to-skin) and total procedure time. Staff turnover within the nursing component of the surgical team was defined as the number of instances any nurse had to leave the operating room over the total number of nurses involved in the operation. A total of 235 lobectomies were performed by 5 surgeons, most commonly for lung cancer (95%). On multivariate analysis, percent forced expiratory volume in 1 second, surgical approach, and lesion size had a significant effect on surgical time. Nursing turnover was associated with a significant increase in surgical time (53.7 minutes; 95% confidence interval, 6.4-101; P = .026) and total procedure time (83.2 minutes; 95% confidence interval, 30.1-136.2; P = .002). Active management of surgical team turnover may be an opportunity to improve operating room efficiency when the surgical team is engaged in a major pulmonary resection. Copyright © 2016 The American Association for Thoracic Surgery. Published by Elsevier Inc. All rights reserved.

  9. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    Science.gov (United States)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  10. The One Plan Project: A cooperative effort of the National Response Team and the Region 6 Regional Response Team to simplify facility emergency response planning

    International Nuclear Information System (INIS)

    Staves, J.; McCormick, K.

    1997-01-01

    The National Response Team (NRT) in coordination with the Region 6 Response Team (RRT) have developed a facility contingency plan format which would integrate all existing regulatory requirements for contingency planning. This format was developed by a multi-agency team, chaired by the USEPA Region 6, in conjunction with various industry, labor, and public interest groups. The impetus for this project came through the USEPA Office of Chemical Emergency Preparedness and Prevention (CEPPO). The current national oil and hazardous material emergency preparedness and response system is an amalgam of federal, state, local, and industrial programs which are often poorly coordinated. In a cooperative effort with the NRT, the CEPPO conducted a Presidential Review of federal agency authorities and coordination responsibilities regarding release prevention, mitigation, and response. Review recommendations led to a Pilot Project in USEPA Region 6. The Region 6 Pilot Project targeted end users in the intensely industrialized Houston Ship Channel (HSC) area, which is comprised of petroleum and petrochemical companies

  11. IAEA-led Operational Safety Team Reviews Dukovany Nuclear Power Plant, Czech Republic

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has commended the Dukovany Nuclear Power Plant (NPP) in the Czech Republic for its safety practices and has also made a series of recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of the Czech Republic to conduct an Operational Safety Review (OSART) of Dukovany NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 6 to 23 June 2011. The team was made up of experts from Armenia, Germany, Hungary, Romania, Slovenia, Sweden, the UK and the USA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at Dukovany conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; and Emergency Planning and Preparedness. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: The plant uses an integrated approach to recruit, select, psychologically assess and train new employees. This approach has resulted in consistently high success rates for licensed operator examinations and the identification of potential candidates for various plant departments; The performance

  12. 30 CFR 780.14 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 780.14 Section... PLAN § 780.14 Operation plan: Maps and plans. Each application shall contain maps and plans as follows: (a) The maps and plans shall show the lands proposed to be affected throughout the operation and any...

  13. Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Barr, Jonathan L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tuffner, Francis K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hadley, Mark D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kreyling, Sean J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schneider, Kevin P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

  14. Surgeons' Leadership Styles and Team Behavior in the Operating Room.

    Science.gov (United States)

    Hu, Yue-Yung; Parker, Sarah Henrickson; Lipsitz, Stuart R; Arriaga, Alexander F; Peyre, Sarah E; Corso, Katherine A; Roth, Emilie M; Yule, Steven J; Greenberg, Caprice C

    2016-01-01

    The importance of leadership is recognized in surgery, but the specific impact of leadership style on team behavior is not well understood. In other industries, leadership is a well-characterized construct. One dominant theory proposes that transactional (task-focused) leaders achieve minimum standards and transformational (team-oriented) leaders inspire performance beyond expectations. We videorecorded 5 surgeons performing complex operations. Each surgeon was scored on the Multifactor Leadership Questionnaire, a validated method for scoring transformational and transactional leadership style, by an organizational psychologist and a surgeon researcher. Independent coders assessed surgeons' leadership behaviors according to the Surgical Leadership Inventory and team behaviors (information sharing, cooperative, and voice behaviors). All coders were blinded. Leadership style (Multifactor Leadership Questionnaire) was correlated with surgeon behavior (Surgical Leadership Inventory) and team behavior using Poisson regression, controlling for time and the total number of behaviors, respectively. All surgeons scored similarly on transactional leadership (range 2.38 to 2.69), but varied more widely on transformational leadership (range 1.98 to 3.60). Each 1-point increase in transformational score corresponded to 3 times more information-sharing behaviors (p leadership and its impact on team performance in the operating room. As in other fields, our data suggest that transformational leadership is associated with improved team behavior. Surgeon leadership development, therefore, has the potential to improve the efficiency and safety of operative care. Copyright © 2016 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

  15. 30 CFR 784.23 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 784.23 Section... PLAN § 784.23 Operation plan: Maps and plans. Each application shall contain maps and plans as follows... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  16. Regional approach to building operational level capacity for disaster planning: the case of the Eastern Africa region.

    Science.gov (United States)

    Bazeyo, W; Mayega, R W; Orach, G C; Kiguli, J; Mamuya, S; Tabu, J S; Sena, L; Rugigana, E; Mapatano, M; Lewy, D; Mock, N; Burnham, G; Keim, M; Killewo, J

    2013-06-01

    The Eastern Africa region is regularly affected by a variety of disasters ranging from drought, to human conflict and population displacement. The magnitude of emergencies and response capacities is similar across the region. In order to strengthen public health disaster management capacities at the operational level in six countries of the Eastern Africa region, the USAID-funded leadership project worked through the HEALTH Alliance, a network of seven schools of public health from six countries in the region to train district-level teams. To develop a sustainable regional approach to building operational level capacity for disaster planning. This project was implemented through a higher education leadership initiative. Project activities were spear-headed by a network of Deans and Directors of public health schools within local universities in the Eastern Africa region. The leadership team envisioned a district-oriented systems change strategy. Pre-service and in-service curricula were developed regionally and district teams were formed to attend short training courses. Project activities began with a situational analysis of the disaster management capacity at national and operational levels. The next steps were chronologically the formation of country training teams and training of trainers, the development of a regional disaster management training curriculum and training materials, the cascading of training activities in the region, and the incorporation of emerging issues into the training curriculum. An evaluation model included the analysis of preparedness impact of the training program. The output from the district teams was the creation of individual district-level disaster plans and their implementation. This 4-year project focused on building operational level public health emergency response capacity, which had not previously been part of any national program. Use of the all-hazard approach rather than a scenario-based contingency planning led to the

  17. Evaluation of communication characteristics of operating teams in NPPs using SNA technique

    Energy Technology Data Exchange (ETDEWEB)

    Kim, H. J.; Lee, S. W.; Kang, H. G.; Seong, P. H. [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Park, J. K. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Kang, H. G. [Khalifa Univ. of Science, Abu Dhabi (United Arab Emirates)

    2012-03-15

    Inappropriate communications within operational teams can lead to serious consequences of a system since it can cause lack of exchange of important information to perform the task to secure the safety of the system in nuclear power plants (NPPs). For that reason, we studied the communication characteristics However, existing studies on the communication characteristics seem to have problem since they have characterized team communications from a single perspective. According that, we have developed an evaluation method to characterize team communications using social network techniques which can evaluate them from various perspectives which are group cohesiveness, frequency of communications, degree of hierarchy, and communication contents. In addition, we suggested some kids of specific communication characteristics of operating teams that can reduce the occurrence of inappropriate communications. Eight verbal protocol data which are audio-visual recorded under emergency training sessions by main control room (MCR) operating teams are used. As a result of the study, there was negative relationship between group cohesiveness and the ratio of inappropriate communications. Moreover, some kinds of specific communication contents are related to the ratio of inappropriate communications. Consequently, we can evaluate communications characteristics of operating teams in NPPs and suggest specific characteristics to provide useful insights to prevent inappropriate communications.

  18. Evaluation of communication characteristics of operating teams in NPPs using SNA technique

    International Nuclear Information System (INIS)

    Kim, H. J.; Lee, S. W.; Kang, H. G.; Seong, P. H.; Park, J. K.; Kang, H. G.

    2012-01-01

    Inappropriate communications within operational teams can lead to serious consequences of a system since it can cause lack of exchange of important information to perform the task to secure the safety of the system in nuclear power plants (NPPs). For that reason, we studied the communication characteristics However, existing studies on the communication characteristics seem to have problem since they have characterized team communications from a single perspective. According that, we have developed an evaluation method to characterize team communications using social network techniques which can evaluate them from various perspectives which are group cohesiveness, frequency of communications, degree of hierarchy, and communication contents. In addition, we suggested some kids of specific communication characteristics of operating teams that can reduce the occurrence of inappropriate communications. Eight verbal protocol data which are audio-visual recorded under emergency training sessions by main control room (MCR) operating teams are used. As a result of the study, there was negative relationship between group cohesiveness and the ratio of inappropriate communications. Moreover, some kinds of specific communication contents are related to the ratio of inappropriate communications. Consequently, we can evaluate communications characteristics of operating teams in NPPs and suggest specific characteristics to provide useful insights to prevent inappropriate communications

  19. Implications of Perioperative Team Setups for Operating Room Management Decisions.

    Science.gov (United States)

    Doll, Dietrich; Kauf, Peter; Wieferich, Katharina; Schiffer, Ralf; Luedi, Markus M

    2017-01-01

    Team performance has been studied extensively in the perioperative setting, but the managerial impact of interprofessional team performance remains unclear. We hypothesized that the interplay between anesthesiologists and surgeons would affect operating room turnaround times, and teams that worked together over time would become more efficient. We analyzed 13,632 surgical cases at our hospital that involved 64 surgeons and 48 anesthesiologists. We detrended and adjusted the data for potential confounders including age, American Society of Anesthesiologists physical status, and surgical list (scheduled cases of specific surgical specialties). The surgical lists were categorized as ear, nose, and throat surgery; trauma surgery; general surgery; and gynecology. We assessed the relationship between turnaround times and assignment of different anesthesiologists to specific surgeons using a Monte Carlo simulation. We found significant differences in team performances among the different surgical lists but no team learning. We constructed managerial decision tables for the assignment of anesthesiologists to specific surgeons at our hospital. We defined a decision algorithm based on these tables. Our analysis indicated that had this algorithm been used in staffing the operating room for the surgical cases represented in our data, median turnaround times would have a reduction potential of 6.8% (95% confidence interval 6.3% to 7.1%). A surgeon is usually predefined for scheduled surgeries (surgical list). Allocation of the right anesthesiologist to a list and to a surgeon can affect the team performance; thus, this assignment has managerial implications regarding the operating room efficiency affecting turnaround times and thus potentially overutilized time of a list at our hospital.

  20. Emergency team and action plan; Brigada de emergencia y plan de accion de emergencia

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez Gorgerino, Ruben Dario [Central Hidroelectrica Itaipu, Hernandarias (Paraguay)]. E-mail: jimenez@itaipu.gov.br

    1998-07-01

    This work reports the various activities developed by a commission designated for the investigation of the fire occurred in the excitation panel of the generator unit 16, for the execution of two tasks: short term creation of plant emergency team, and a long term implementation of emergency action plan.

  1. Operative team communication during simulated emergencies: Too busy to respond?

    Science.gov (United States)

    Davis, W Austin; Jones, Seth; Crowell-Kuhnberg, Adrianna M; O'Keeffe, Dara; Boyle, Kelly M; Klainer, Suzanne B; Smink, Douglas S; Yule, Steven

    2017-05-01

    Ineffective communication among members of a multidisciplinary team is associated with operative error and failure to rescue. We sought to measure operative team communication in a simulated emergency using an established communication framework called "closed loop communication." We hypothesized that communication directed at a specific recipient would be more likely to elicit a check back or closed loop response and that this relationship would vary with changes in patients' clinical status. We used the closed loop communication framework to code retrospectively the communication behavior of 7 operative teams (each comprising 2 surgeons, anesthesiologists, and nurses) during response to a simulated, postanesthesia care unit "code blue." We identified call outs, check backs, and closed loop episodes and applied descriptive statistics and a mixed-effects negative binomial regression to describe characteristics of communication in individuals and in different specialties. We coded a total of 662 call outs. The frequency and type of initiation and receipt of communication events varied between clinical specialties (P communication events than anesthesiologists. For the average participant, directed communication increased the likelihood of check back by at least 50% (P = .021) in periods preceding acute changes in the clinical setting, and exerted no significant effect in periods after acute changes in the clinical situation. Communication patterns vary by specialty during a simulated operative emergency, and the effect of directed communication in eliciting a response depends on the clinical status of the patient. Operative training programs should emphasize the importance of quality communication in the period immediately after an acute change in the clinical setting of a patient and recognize that communication patterns and needs vary between members of multidisciplinary operative teams. Copyright © 2016 Elsevier Inc. All rights reserved.

  2. Surgeons' Leadership Styles and Team Behavior in the Operating Room

    Science.gov (United States)

    Hu, Yue-Yung; Parker, Sarah Henrickson; Lipsitz, Stuart R; Arriaga, Alexander F; Peyre, Sarah E; Corso, Katherine A; Roth, Emilie M; Yule, Steven J; Greenberg, Caprice C

    2016-01-01

    Background The importance of leadership is recognized in surgery, but the specific impact of leadership style on team behavior is not well understood. In other industries, leadership is a well-characterized construct. One dominant theory proposes that transactional (task-focused) leaders achieve minimum standards, whereas transformational (team-oriented) leaders inspire performance beyond expectations. Study Design We video-recorded 5 surgeons performing complex operations. Each surgeon was scored on the Multifactor Leadership Questionnaire, a validated method for scoring transformational and transactional leadership style, by an organizational psychologist and a surgeon-researcher. Independent coders assessed surgeons' leadership behaviors according to the Surgical Leadership Inventory and team behaviors (information-sharing, cooperative, and voice behaviors). All coders were blinded. Leadership style (MLQ) was correlated with surgeon behavior (SLI) and team behavior using Poisson regression, controlling for time and the total number of behaviors, respectively. Results All surgeons scored similarly on transactional leadership (2.38-2.69), but varied more widely on transformational leadership (1.98-3.60). Each 1-point increase in transformational score corresponded to 3× more information-sharing behaviors (psupportive behaviors (pleadership and its impact on team performance in the OR. As in other fields, our data suggest that transformational leadership is associated with improved team behavior. Surgeon leadership development therefore has the potential to improve the efficiency and safety of operative care. PMID:26481409

  3. Can cultural differences lead to accidents? Team cultural differences and sociotechnical system operations.

    Science.gov (United States)

    Strauch, Barry

    2010-04-01

    I discuss cultural factors and how they may influence sociotechnical system operations. Investigations of several major transportation accidents suggest that cultural factors may have played a role in the causes of the accidents. However, research has not fully addressed how cultural factors can influence sociotechnical systems. I review literature on cultural differences in general and cultural factors in sociotechnical systems and discuss how these differences can affect team performance in sociotechnical systems. Cultural differences have been observed in social and interpersonal dimensions and in cognitive and perceptual styles; these differences can affect multioperator team performance. Cultural factors may account for team errors in sociotechnical systems, most likely during high-workload, high-stress operational phases. However, much of the research on cultural factors has methodological and interpretive shortcomings that limit their applicability to sociotechnical systems. Although some research has been conducted on the role of cultural differences on team performance in sociotechnical system operations, considerable work remains to be done before the effects of these differences can be fully understood. I propose a model that illustrates how culture can interact with sociotechnical system operations and suggest avenues of future research. Given methodological challenges in measuring cultural differences and team performance in sociotechnical system operations, research in these systems should use a variety of methodologies to better understand how culture can affect multioperator team performance in these systems.

  4. Study on team evaluation (5). On application of behavior observation-based teamwork evaluation sheet for power plant operator team

    International Nuclear Information System (INIS)

    Sasou, Kunihide; Sugihara, Yoshikuni

    2009-01-01

    This report discusses the range of application of the behavior observation-based teamwork evaluation sheet. Under the concept of this method, teamwork evaluation sheet is developed, which assumes a certain single failure (failure of feed water transmitter). The evaluation sheets are applied to evaluate team work of 26 thermal power plant operator teams in combined under abnormal operating conditions of failure of feed water transmitter, feed draft fan or steam flow governor. As a result of ANOVA, it finds that there are no differences between 3 kinds of single failure. In addition, the similar analysis is executed to 3 kinds of multiple failures (steam generator tube rapture, loss of coolant accident and loss of secondary coolant accident) under which 7 PWR nuclear power plant operator teams are evaluated. As a result, ANOVA shows no differences between 3 kinds of multiple failures. These results indicate that a behavior observation-based team work evaluation sheet, which is designed for a certain abnormal condition, is applicable to the abnormal conditions that have the same development of abnormal conditions. (author)

  5. Experimental studies of computerized procedures and team size in nuclear power plant operations

    International Nuclear Information System (INIS)

    Huang, F.-H.; Hwang, S.-L.

    2009-01-01

    The operation of a nuclear power plant is so complex that it requires teamwork. To support team performance, a system need to provide all team members integrated information displays as well as decision aids (e.g., computerized procedures). Two experiments were conducted to investigate the effects of computerized procedures and team size on operating performance. Forty-five participants were involved in the experiments. Each participant executed decision and action tasks to deal with alarm signals, while detecting occasional system errors in the interface. Results showed that effects of computerized procedures were significant on various performance indicators, such as operation time, operation errors, and learning effect, and that two operators would be a satisfactory size in the teamwork system providing computerized procedures

  6. Action plan for the communication process in a nursing team

    Directory of Open Access Journals (Sweden)

    Priscilla Valladares Broca

    2016-06-01

    Full Text Available The objective of this study is to propose an action plan for the communication process in the nursing team. The theoretical references were: the model of a communication process proposed by Berlo and essential concepts of King´s Theory. It is a qualitative, convergent-care research. The data production technique was the semi-structured interview with 25 nurses of a public hospital. Data used the thematic content analysis technique. The elements of the communication team are: perception, self, space, time, stress, role, authority, power, status, audience, empathy and nonverbal communication. The plan proposes a dynamic, flexible, interactive and relational communication process, in order to contribute to the professional qualification and make new practices of care viable. It was concluded that its elements do not have a fixed and stable position, but throughout the process they are used according to the needs of each party.

  7. WFIRST: STScI Science Operations Center (SSOC) Activities and Plans

    Science.gov (United States)

    Gilbert, Karoline M.; STScI WFIRST Team

    2018-01-01

    The science operations for the WFIRST Mission will be distributed between Goddard Space Flight Center, the Space Telescope Science Institute (STScI), and the Infrared Processing and Analysis Center (IPAC). The STScI Science Operations Center (SSOC) will schedule and archive all WFIRST observations, will calibrate and produce pipeline-reduced data products for the Wide Field Instrument, and will support the astronomical community in planning WFI observations and analyzing WFI data. During the formulation phase, WFIRST team members at STScI have developed operations concepts for scheduling, data management, and the archive; have performed technical studies investigating the impact of WFIRST design choices on data quality and analysis; and have built simulation tools to aid the community in exploring WFIRST’s capabilities. We will highlight examples of each of these efforts.

  8. Surgical Instrument Sets for Special Operations Expeditionary Surgical Teams.

    Science.gov (United States)

    Hale, Diane F; Sexton, Justin C; Benavides, Linda C; Benavides, Jerry M; Lundy, Jonathan B

    The deployment of surgical assets has been driven by mission demands throughout years of military operations in Iraq and Afghanistan. The transition to the highly expeditious Golden Hour Offset Surgical Transport Team (GHOST- T) now offers highly mobile surgical assets in nontraditional operating rooms; the content of the surgical instrument sets has also transformed to accommodate this change. The 102nd Forward Surgical Team (FST) was attached to Special Operations assigned to southern Afghanistan from June 2015 to March 2016. The focus was to decrease overall size and weight of FST instrument sets without decreasing surgical capability of the GHOST-T. Each instrument set was evaluated and modified to include essential instruments to perform damage control surgery. The overall number of main instrument sets was decreased from eight to four; simplified augmentation sets have been added, which expand the capabilities of any main set. The overall size was decreased by 40% and overall weight decreased by 58%. The cardiothoracic, thoracotomy, and emergency thoracotomy trays were condensed to thoracic set. The orthopedic and amputation sets were replaced with an augmentation set of a prepackaged orthopedic external fixator set). An augmentation set to the major or minor basic sets, specifically for vascular injuries, was created. Through the reorganization of conventional FST surgical instrument sets to maintain damage control capabilities and mobility, the 102nd GHOST-T reduced surgical equipment volume and weight, providing a lesson learned for future surgical teams operating in austere environments. 2017.

  9. Improving the Interdisciplinary Team Work in the Operating Room

    DEFF Research Database (Denmark)

    Tørring, Birgitte

    In surgical teams, where health professionals are highly interdependent and work under time pressure, it is of particular importance that the team work is well-functioning to secure treatment quality and patient safety. Using the theory of relational coordination (RC) may be the key to unlocking...... the black box of teamwork in search for relational elements critical to successful collaboration and communication. Few single studies exists which explore how RC could be observed and improved in this context. The present study examines surgical teams in selected operating rooms (OR) focusing on RC...... period in 2014 in two orthopedic surgical wards in a university hospital. A directed content analysis on the basis of theory of RC is used to transform the data to show different typologies of interdisciplinary team work. RC was subsequently measured using the RC Survey. Data describe very complex...

  10. Simulation of operator team behavior. Introduction of emotional function

    International Nuclear Information System (INIS)

    Yoshimura, Seiichi; Hasegawa, Naoko

    1997-01-01

    Operator's behavior may be influenced by the atmosphere in a control room. Therefore, it is important to consider operator's emotions especially when abnormal situations occur in a plant. SYBORG (Simulation System for the Behavior of an Operating Group) is a system for simulating the behavior of an operator team. Based on 1) Investigations of how operators feel the situations in a control room and 2) biological and psychological similarities between emotion and immunity, an emotional function was tried to be incorporated into SYBORG using immune algorithm. (author)

  11. Site scientific mission plan for the southern Great Plains CART site, January--June 1998

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1998-01-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. The primary purpose of this site scientific mission plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team, Operations Team, and Instrument Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the Site operator, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  12. Team table: a framework and tool for continuous factory planning

    Science.gov (United States)

    Sihn, Wilfried; Bischoff, Juergen; von Briel, Ralf; Josten, Marcus

    2000-10-01

    Growing market turbulences and shorter product life cycles require a continuous adaptation of factory structures resulting in a continuous factory planning process. Therefore a new framework is developed which focuses on configuration and data management process integration. This enable an online system performance evaluation based on continuous availability of current data. The use of this framework is especially helpful and will guarantee high cost and time savings, when used in the early stages of the planning, called the concept or rough planning phase. The new framework is supported by a planning round table as a tool for team-based configuration processes integrating the knowledge of all persons involved in planning processes. A case study conducted at a German company shows the advantages which can be achieved by implementing the new framework and methods.

  13. Reactor operation plan preparing device

    International Nuclear Information System (INIS)

    Sano, Hiroki; Maruyama, Hiromi; Kinoshita, Mitsuo; Fukuzaki, Koji; Banto, Masaru; Fukazawa, Yukihisa.

    1993-01-01

    The device comprises a means for retrieving a control rod pattern capable of satisfying a thermal limit upon aimed power/minimum flow rate and providing minimum xenon and a control rod pattern maximum xenon. It further comprises a means for selecting a control rod pattern corresponding to a xenon equilibrium condition, and selecting a control rod which provides a greater thermal margin to provide a control rod operation sequence for each of the patterns. Further, the device comprises an outline plan preparing means and a correction means therefor, a simplified sequence table reference means operated along with sequence change, an operation limit region input means, a control rod operation preferential region changing means, a thermal margin evaluation region and an input means. This can automatically prepare the operation plan, decrease the times for preparation of detailed plans by using the outline plan preparing function, thereby enabling to remarkably shorten the time for preparing of an operation plan. (N.H.)

  14. Joint Operation Planning

    National Research Council Canada - National Science Library

    2006-01-01

    .... It sets forth joint doctrine to govern the joint operation planning activities and performance of the Armed Forces of the United States in joint operations, and provides the joint doctrinal basis...

  15. Logistics planning and logistics planning factors for humanitarian operations

    OpenAIRE

    Sullivan, Donna Marie.

    1995-01-01

    Due to the increasing demand on the military to conduct humanitarian operations, the need for logistics planning factors that are applicable to these operations has arisen. This thesis develops a model for humanitarian operations and employs the model to develop logistics planning factors for material consumption and a computer-assisted planning aid relating to the support of the victim population. U.S. Navy (U.S.N.) author.

  16. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs.

  17. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    International Nuclear Information System (INIS)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs

  18. Intraprofessional, team-based treatment planning for oral health students in the comprehensive care clinic.

    Science.gov (United States)

    Mattheos, Nikos; Storrs, Mark; Foster, Lea; Oberholzer, Theunis

    2012-12-01

    In 2009, Griffith University School of Dentistry and Oral Health, in Queensland, Australia, introduced into its various curricula the concept of team-based treatment planning (TBTP), aiming to facilitate intraprofessional, interdisciplinary training and peer learning among its students. Fifty student teams were organized, each of which included students from three programs (Dental Science, Oral Health Therapy, and Dental Technology) and three years of study (third-, fourth-, and fifth-year students). This study prospectively evaluated the impact of TBTP on students' perceptions and attitudes towards teamwork and their role in a team of peers. A total of 202 students who participated in fifty TBTP teams were prospectively surveyed at baseline and at six and twelve months after introduction of TBTP. "Reliable" and "responsible" were reported to be the most important qualities of both an effective team leader and member. Fifth-year students identified "hard-working" as an important quality of the ideal leader as opposed to the fourth-year students who ranked "supportive" higher. Attitudes of the fifth-year students towards TBTP appeared to have declined significantly from the previous years, while fourth-year students remained consistently more positive. In addition, fourth-year students appeared more likely to enjoy working in a team and considered themselves more effective in a team. No gender differences were observed, other than female students' appearing less confident to lead a team. It was concluded that the function of student-directed interdisciplinary, intraprofessional treatment planning teams might pose disproportionate strain on fifth-year students, impacting their attitudes to such modes of work.

  19. Level-2 Milestone 5588: Deliver Strategic Plan and Initial Scalability Assessment by Advanced Architecture and Portability Specialists Team

    Energy Technology Data Exchange (ETDEWEB)

    Draeger, Erik W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-09-30

    This report documents the fact that the work in creating a strategic plan and beginning customer engagements has been completed. The description of milestone is: The newly formed advanced architecture and portability specialists (AAPS) team will develop a strategic plan to meet the goals of 1) sharing knowledge and experience with code teams to ensure that ASC codes run well on new architectures, and 2) supplying skilled computational scientists to put the strategy into practice. The plan will be delivered to ASC management in the first quarter. By the fourth quarter, the team will identify their first customers within PEM and IC, perform an initial assessment and scalability and performance bottleneck for next-generation architectures, and embed AAPS team members with customer code teams to assist with initial portability development within standalone kernels or proxy applications.

  20. The effects of physical threat on team processes during complex task performance

    NARCIS (Netherlands)

    Kamphuis, W.; Gaillard, A.W.K.; Vogelaar, A.L.W.

    2011-01-01

    Teams have become the norm for operating in dangerous and complex situations. To investigate how physical threat affects team performance, 27 threeperson teams engaged in a complex planning and problem-solving task, either under physical threat or under normal conditions. Threat consisted of the

  1. Can We Measure Operating Team's Situation Awareness with Verbal Protocols?

    International Nuclear Information System (INIS)

    Lee, Seung Woo; Kim, Ar Ryum; Kang, Hyun Gook; Seong, Poong Hyun; Park, Jin Kyun

    2011-01-01

    Today's systems are complex, focused on not just physical tasks, but on elaborate perceptual and cognitive tasks as well. Hence, humans in many complex and dynamic systems are required to act as effective and timely decision makers. Situation Awareness (SA), which is used within human factor research to explain to what extent operators of safety critical and complex real systems know what is going on the system and the environment, is considered a prerequisite factor for effective decision making and performance. Thus, the need for operators to maintain SA in complex and dynamic environments is frequently cited as a key to effective and efficient performance. In terms of understanding SA, much effort has been devoted to the development of a measurement method of SA. Thus far, however, various studies have been limited to addressing the SA of individual operators. However, many complex systems are operated by teams. It is typical of complex systems that they require more than one operator. The purpose of this study is to develop team SA measurement method using verbal protocol data

  2. Space shuttle operations integration plan

    Science.gov (United States)

    1975-01-01

    The Operations Integration Plan is presented, which is to provide functional definition of the activities necessary to develop and integrate shuttle operating plans and facilities to support flight, flight control, and operations. It identifies the major tasks, the organizations responsible, their interrelationships, the sequence of activities and interfaces, and the resultant products related to operations integration.

  3. Site scientific mission plan for the southern Great Plain CART site July-December 1997.

    Energy Technology Data Exchange (ETDEWEB)

    Lamb, P.J.; Peppler, R.A.; Sisterson, D.L.

    1997-08-28

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on July 1, 1997, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  4. Warehouse operations planning model for Bausch & Lomb

    NARCIS (Netherlands)

    Atilgan, Ceren

    2009-01-01

    Operations planning is a major part of the Sales& Operations Planning (S&OP) process. It provides an overview on the operations capacity requirements by considering the supply and demand plan. However, Bausch& Lomb does not have a structured operations planning process for their warehouse

  5. Site scientific mission plan for the Southern Great Plains CART Site, January--June 1999

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Sisterson, D.L.; Lamb, P.

    1999-03-10

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site was designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This Site Scientific Mission Plan defines the scientific priorities for site activities during the six months beginning on January 1, 1999, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this document is to provide scientific guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, and Instrument Team [IT]) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the site program manager, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  6. Site scientific mission plan for the Southern Great Plains CART site: July--December 1998

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1998-07-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site was designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This Site Scientific Mission Plan defines the scientific priorities for site activities during the six months beginning on July 1, 1998, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this document is to provide scientific guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, and Instrument Team [IT]) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the site program manager, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  7. Operating Plan and Guidelines (2011 - 2016)

    International Nuclear Information System (INIS)

    2011-01-01

    The Committee on Nuclear Regulatory Activities (CNRA) of the OECD Nuclear Energy Agency (NEA) is an international committee made up primarily of senior nuclear regulators. It was established in 1989 as a forum for the exchange of information and experience among regulatory organisations and for the review of developments which could affect regulatory requirements. The Committee is responsible for the programme of the NEA, concerning the regulation, licensing and inspection of nuclear installations. In particular, the Committee reviews current practices and operating experience. The Joint CSNI/CNRA Strategic Plan states that: The Operating Plan for each committee aligns with the Joint CNRA/ CSNI Strategic Plan. The Committee's Operating Plans describes each Committee's organisation, priorities, and operating procedures to be used in fulfilling their mandates in accordance with this strategic plan. Specific attention will be given to ensure that cross-cutting issues are satisfactorily dealt with. This report represents such an operating plan. The intention is that it should fit onto a new third rung on the ladder representing the hierarchy of documents that govern the work of CNRA. At the top of this hierarchy is the Strategic Plan of the NEA; immediately below that is the Joint CSNI/CNRA Strategic Plan; followed by the new operating plan and the guidelines for methods of work. This plan sets the basis for establishing the current CNRA Programme of Work. Since the issuance of the last plan in 2007 there has been a significant shift and many member countries are now constructing new facilities or in the process of legislative or technical processing for new licenses. This comes along in an atmosphere in which current operating plants requesting power up-rates, extended licenses, and substantial activity in new licensing and new construction. It is clear that all these activities require similar attention from the regulators and operators, and the responsibilities

  8. Measuring situation awareness of operation teams in NPPs using a verbal protocol analysis

    International Nuclear Information System (INIS)

    Lee, Seung Woo; Park, Jinkyun; Kim, Ar ryum; Seong, Poong Hyun

    2012-01-01

    Highlights: ► A method for measuring team situation awareness is developed. ► Verbal protocol analysis is adopted in this method. ► This method resolves uncertainties from conventional methods. ► This method can be used in evaluating the human–system interfaces. - Abstract: Situation awareness (SA) continues to receive a considerable amount of attention from the ergonomics community given that need for operators to maintain SA is frequently cited as a key to effective and efficient performance. Although complex and dynamic environments such as that of a main control room (MCR) in a nuclear power plant (NPP) are operated by operation teams, and while team situation awareness (TSA) is also cited as an important factor, research is limited to individual SA. However, understanding TSA can provide a window onto the characteristics of team acquisition as well as the performance of a complex skill. Therefore, such knowledge can be valuable in diagnosing team performance successes and failures. Moreover, training and design interventions can target the cognitive underpinnings of team performance, with implications for the design of technological aids to improve team performance. Despite these advantages and the importance of understanding TSA, measures and methods targeting TSA are sparse and fail to address it properly. In this study, an objective TSA measurement method is developed in an effort to understand TSA. First, key considerations for developing a method are derived. Based on these considerations, the proposed method is developed while mainly focusing on the creation of logical connections between team communications and TSA. A speech act coding scheme is also implemented to analyze team communications. The TSA measurement method developed in this study provides a measure for each level of TSA. It was revealed from a preliminary study that this TSA measurement method is feasible for measuring TSA to a fair extent. Useful insight into TSA is also derived.

  9. Site scientific mission plan for the Southern Great Plains CART site: January 1997--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Institute for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States)

    1997-01-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1997, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  10. 30 CFR 780.13 - Operation plan: Blasting.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Blasting. 780.13 Section 780.13... SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.13 Operation plan: Blasting. (a) Blasting plan. Each application shall contain a blasting plan for the proposed...

  11. Biomedical programs operations plans

    Science.gov (United States)

    Walbrecher, H. F.

    1974-01-01

    Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

  12. The Mission Operations Planning Assistant

    Science.gov (United States)

    Schuetzle, James G.

    1987-01-01

    The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Principal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZetaLisp and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.

  13. Architecture for spacecraft operations planning

    Science.gov (United States)

    Davis, William S.

    1991-01-01

    A system which generates plans for the dynamic environment of space operations is discussed. This system synthesizes plans by combining known operations under a set of physical, functional, and temperal constraints from various plan entities, which are modeled independently but combine in a flexible manner to suit dynamic planning needs. This independence allows the generation of a single plan source which can be compiled and applied to a variety of agents. The architecture blends elements of temperal logic, nonlinear planning, and object oriented constraint modeling to achieve its flexibility. This system was applied to the domain of the Intravehicular Activity (IVA) maintenance and repair aboard Space Station Freedom testbed.

  14. Site Scientific Mission Plan for the Southern Great Plains CART site: January--June 1994

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, J.M.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1993-12-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1994, and also looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM Functional Teams (Management Team, Experiment Support Team, Operations Team, Data Management Team, Instrument Team, and Campaign Team), and it serves to disseminate the plans more generally within the ARM Program and among the Science Team. This document includes a description of the site`s operational status and the primary envisaged site activities, together with information concerning approved and proposed Intensive Observation Periods. Amendments will be prepared and distributed whenever the content changes by more than 30% within a six-month period. The primary users of this document are the site operator, the site scientist, the Science Team through the ARM Program Science Director, the ARM Program Experiment Center, and the aforementioned ARM Program Functional Teams. This plan is a living document that will be updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  15. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    Science.gov (United States)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  16. Implementing Distributed Operations: A Comparison of Two Deep Space Missions

    Science.gov (United States)

    Mishkin, Andrew; Larsen, Barbara

    2006-01-01

    Two very different deep space exploration missions--Mars Exploration Rover and Cassini--have made use of distributed operations for their science teams. In the case of MER, the distributed operations capability was implemented only after the prime mission was completed, as the rovers continued to operate well in excess of their expected mission lifetimes; Cassini, designed for a mission of more than ten years, had planned for distributed operations from its inception. The rapid command turnaround timeline of MER, as well as many of the operations features implemented to support it, have proven to be conducive to distributed operations. These features include: a single science team leader during the tactical operations timeline, highly integrated science and engineering teams, processes and file structures designed to permit multiple team members to work in parallel to deliver sequencing products, web-based spacecraft status and planning reports for team-wide access, and near-elimination of paper products from the operations process. Additionally, MER has benefited from the initial co-location of its entire operations team, and from having a single Principal Investigator, while Cassini operations have had to reconcile multiple science teams distributed from before launch. Cassini has faced greater challenges in implementing effective distributed operations. Because extensive early planning is required to capture science opportunities on its tour and because sequence development takes significantly longer than sequence execution, multiple teams are contributing to multiple sequences concurrently. The complexity of integrating inputs from multiple teams is exacerbated by spacecraft operability issues and resource contention among the teams, each of which has their own Principal Investigator. Finally, much of the technology that MER has exploited to facilitate distributed operations was not available when the Cassini ground system was designed, although later adoption

  17. Operator-assisted planning and execution of proximity operations subject to operational constraints

    Science.gov (United States)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1991-01-01

    Future multi-vehicle operations will involve multiple scenarios that will require a planning tool for the rapid, interactive creation of fuel-efficient trajectories. The planning process must deal with higher-order, non-linear processes involving dynamics that are often counter-intuitive. The optimization of resulting trajectories can be difficult to envision. An interaction proximity operations planning system is being developed to provide the operator with easily interpreted visual feedback of trajectories and constraints. This system is hosted on an IRIS 4D graphics platform and utilizes the Clohessy-Wiltshire equations. An inverse dynamics algorithm is used to remove non-linearities while the trajectory maneuvers are decoupled and separated in a geometric spreadsheet. The operator has direct control of the position and time of trajectory waypoints to achieve the desired end conditions. Graphics provide the operator with visualization of satisfying operational constraints such as structural clearance, plume impingement, approach velocity limits, and arrival or departure corridors. Primer vector theory is combined with graphical presentation to improve operator understanding of suggested automated system solutions and to allow the operator to review, edit, or provide corrective action to the trajectory plan.

  18. Notional Airspace Operations Demonstration Plan

    Science.gov (United States)

    Trongale, Nicholas A.

    2006-01-01

    The airspace operations demonstration (AOD) is intended to show that the Access 5 Step 1 functional requirements can be met. The demonstration will occur in two phases. The initial on-range phase will be carried out in restricted airspace to demonstrate the cooperative collision avoidance (CCA) functional requirements and to provide risk-reduction for the AOD by allowing the test team to rehearse some elements of the demonstration mission. The CCA system to be used in these flights is based on Automatic Dependent Surveillance-Broadcast (ADS-B) which is a commercially-available system by which airplanes constantly broadcast their current position and altitude to other aircraft and ground resources over a dedicated radio datalink. The final phase will occur in the national airspace (NAS) and will be the formal demonstration of the remainder of the proposed functional requirements. The general objectives of the AOD are as follows: (1) Demonstrate that the UAS can aviate in the NAS (2) Demonstrate that the UAS can navigate in the NAS (3) Demonstrate that the UAS can communicate with the NAS (4) Demonstrate that the UAS can perform selected collision avoidance functions in the NAS (5) Demonstrate that the UAS can evaluate and avoid weather conflicts in the NAS (6) Demonstrate that the UAS can provide adequate command and control in the NAS In addition to the stated objectives, there are a number of goals for the flight demonstration. The demo can be accomplished successfully without achieving these goals, but these goals are to be used as a guideline for preparing for the mission. The goals are: (1) Mission duration of at least 24 hours (2) Loiter over heavy traffic to evaluate the data block issue identified during the Access 5 Airspace Operations Simulations (3) Document the contingency management process and lessons learned (4) Document the coordination process for Ground Control Stations (GCS) handoff (5) Document lessons learned regarding the process of flying in

  19. Space Station Freedom operations planning

    Science.gov (United States)

    Accola, Anne L.; Keith, Bryant

    1989-01-01

    The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.

  20. Automating Space Station operations planning

    Science.gov (United States)

    Ziemer, Kathleen A.

    1989-01-01

    The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.

  1. Employing Multiple Unmanned Aerial Vehicles for Co-Operative Path Planning

    Directory of Open Access Journals (Sweden)

    Durdana Habib

    2013-05-01

    Full Text Available Abstract In this paper, we work to develop a path planning solution for a group of Unmanned Aerial Vehicles (UAVs using a Mixed Integer Linear Programming (MILP approach. Co-operation among team members not only helps reduce mission time, it makes the execution more robust in dynamic environments. However, the problem becomes more challenging as it requires optimal resource allocation and is NP-hard. Since UAVs may be lost or may suffer significant damage during the course of the mission, plans may need to be modified in real-time as the mission proceeds. Therefore, multiple UAVs have a better chance of completing a mission in the face of failures. Such military operations can be treated as a variant of the Multiple Depot Vehicle Routing Problem (MDVRP. The proposed solution must be such that m UAVs start from multiple source locations to visit n targets and return to a set of destination locations such that (1 each target is visited exactly by one of the chosen UAVs (2 the total distance travelled by the group is minimized and (3 the number of targets that each UAV visits may not be less than K or greater than L.

  2. Foundations for teaching surgeons to address the contributions of systems to operating room team conflict.

    Science.gov (United States)

    Rogers, David A; Lingard, Lorelei; Boehler, Margaret L; Espin, Sherry; Schindler, Nancy; Klingensmith, Mary; Mellinger, John D

    2013-09-01

    Prior research has shown that surgeons who effectively manage operating room conflict engage in a problem-solving stage devoted to modifying systems that contribute to team conflict. The purpose of this study was to clarify how systems contributed to operating room team conflict and clarify what surgeons do to modify them. Focus groups of circulating nurses and surgeons were conducted at 5 academic medical centers. Narratives describing the contributions of systems to operating room conflict and behaviors used by surgeons to address those systems were analyzed using the constant comparative approach associated with a constructivist grounded theory approach. Operating room team conflict was affected by 4 systems-related factors: team features, procedural-specific staff training, equipment management systems, and the administrative leadership itself. Effective systems problem solving included advocating for change based on patient safety concerns. The results of this study provide clarity about how systems contribute to operating room conflict and what surgeons can do to effectively modify these systems. This information is foundational material for a conflict management educational program for surgeons. Copyright © 2013 Elsevier Inc. All rights reserved.

  3. Developing team leadership to facilitate guideline utilization: planning and evaluating a 3-month intervention strategy.

    Science.gov (United States)

    Gifford, Wendy; Davies, Barbara; Tourangeau, Ann; Lefebre, Nancy

    2011-01-01

    Research describes leadership as important to guideline use. Yet interventions to develop current and future leaders for this purpose are not well understood. To describe the planning and evaluation of a leadership intervention to facilitate nurses' use of guideline recommendations for diabetic foot ulcers in home health care. Planning the intervention involved a synthesis of theory and research (qualitative interviews and chart audits). One workshop and three follow-up teleconferences were delivered at two sites to nurse managers and clinical leaders (n=15) responsible for 180 staff nurses. Evaluation involved workshop surveys and interviews. Highest rated intervention components (four-point scale) were: identification of target indicators (mean 3.7), and development of a team leadership action plan (mean 3.5). Pre-workshop barriers assessment rated lowest (mean 2.9). Three months later participants indicated their leadership performance had changed as a result of the intervention, being more engaged with staff and clear about implementation goals. Creating a team leadership action plan to operationalize leadership behaviours can help in delivery of evidence-informed care. Access to clinical data and understanding team leadership knowledge and skills prior to formal training will assist nursing management in tailoring intervention strategies to identify needs and gaps. © 2010 The Authors. Journal compilation © 2010 Blackwell Publishing Ltd.

  4. Medical capability team: the clinical microsystem for combat healthcare delivery in counterinsurgency operations.

    Science.gov (United States)

    Clark, Susz; Van Steenvort, Jon K

    2008-01-01

    Today's operational environment in the support of counterinsurgency operations requires greater tactical and operational flexibility and diverse medical capabilities. The skills and organizations required for full spectrum medical operations are different from those of the past. Combat healthcare demands agility and the capacity for rapid change in clinical systems and processes to better support the counterinsurgency environment. This article proposes the Army Medical Department (AMEDD) develop and implement the medical capability team (MCT) for combat healthcare delivery. It discusses using the concept of the brigade combat team to develop medical capability teams as the unit of effectiveness to transform frontline care; provides a theoretical overview of the MCT as a "clinical microsystem"; discusses MCT leadership, training, and organizational support, and the deployment and employment of the MCT in a counterinsurgency environment. Additionally, this article proposes that the AMEDD initiate the development of an AMEDD Combat Training Center of Excellence to train and validate the MCTs. The complexity of combat healthcare demands an agile and campaign quality AMEDD with joint expeditionary capability in order to promote the best patient outcomes in a counterinsurgency environment.

  5. AIS ASM Operational Integration Plan

    Science.gov (United States)

    2013-08-01

    Rack mount computer AIS Radio Interface Ethernet Switch 192.168.0.x Firewall Cable Modem 192.168.0.1 VTS Accred. Boundary AIS ASM Operational... AIS ASM Operational Integration Plan Distribution Statement A: Approved for public release; distribution is unlimited. August 2013 Report No...CD-D-07-15 AIS ASM Operational Integration Plan ii UNCLAS//Public | CG-926 R&DC | I. Gonin, et al. | Public August 2013 N O T I C

  6. 78 FR 21245 - Continuity of Operations Plan

    Science.gov (United States)

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  7. Developing High-Functioning Teams: Factors Associated With Operating as a "Real Team" and Implications for Patient-Centered Medical Home Development.

    Science.gov (United States)

    Stout, Somava; Zallman, Leah; Arsenault, Lisa; Sayah, Assaad; Hacker, Karen

    2017-01-01

    Team-based care is a foundation of health care redesign models like the patient-centered medical home (PCMH). Yet few practices rigorously examine how the implementation of PCMH relates to teamwork. We identified factors associated with the perception of a practice operating as a real team. An online workforce survey was conducted with all staff of 12 primary care sites of Cambridge Health Alliance at different stages of PCMH transformation. Bivariate and multivariate analyses of factors associated with teamwork perceptions were conducted. In multivariate models, having effective leadership was the main factor associated with practice teamwork perceptions (odds ratio [OR], 10.49; 95% confidence interval [CI], 5.39-20.43); in addition, practicing at a site in an intermediate stage of PCMH transformation was also associated with enhanced team perceptions (OR, 2.44; 95% CI, 1.28-4.64). In a model excluding effective leadership, respondents at sites in an intermediate stage of PCMH transformation (OR, 1.95; 95% CI, 1.1-3.4) and who had higher care team behaviors (such as huddles and weekly meetings; OR, 3.41; 95% CI, 1.30-8.92), higher care team perceptions (OR, 2.65; 95% CI, 1.15-6.11), and higher job satisfaction (OR, 2.00; 95% CI, 1.02-3.92) had higher practice teamwork perceptions. This study highlights the strong association between effective leadership, care team behaviors and perceptions, and job satisfaction with perceptions that practices operate as real teams. Although we cannot infer causality with these cross-sectional data, this study raises the possibility that providing attention to these factors may be important in augmenting practice teamwork perceptions.

  8. Asteroid team

    International Nuclear Information System (INIS)

    Matson, D.L.

    1988-01-01

    The purpose of this task is to support asteroid research and the operation of an Asteroid Team within the Earth and Space Sciences Division at the Jet Propulsion Laboratory (JPL). The Asteroid Team carries out original research on asteroids in order to discover, better characterize and define asteroid properties. This information is needed for the planning and design of NASA asteroid flyby and rendezvous missions. The asteroid Team also provides scientific and technical advice to NASA and JPL on asteroid related programs. Work on asteroid classification continued and the discovery of two Earth-approaching M asteroids was published. In the asteroid photometry program researchers obtained N or Q photometry for more than 50 asteroids, including the two M-earth-crossers. Compositional analysis of infrared spectra (0.8 to 2.6 micrometer) of asteroids is continuing. Over the next year the work on asteroid classification and composition will continue with the analysis of the 60 reduced infrared spectra which we now have at hand. The radiometry program will continue with the reduction of the N and Q bandpass data for the 57 asteroids in order to obtain albedos and diameters. This year the emphasis will shift to IRAS follow-up observations; which includes objects not observed by IRAS and objects with poor or peculiar IRAS data. As in previous year, we plan to give top priority to any opportunities for observing near-Earth asteroids and the support (through radiometric lightcurve observations from the IRTF) of any stellar occultations by asteroids for which occultation observation expeditions are fielded. Support of preparing of IRAS data for publication and of D. Matson for his participation in the NASA Planetary Astronomy Management and Operations Working Group will continue

  9. Asteroid team

    Science.gov (United States)

    Matson, D. L.

    1988-01-01

    The purpose of this task is to support asteroid research and the operation of an Asteroid Team within the Earth and Space Sciences Division at the Jet Propulsion Laboratory (JPL). The Asteroid Team carries out original research on asteroids in order to discover, better characterize and define asteroid properties. This information is needed for the planning and design of NASA asteroid flyby and rendezvous missions. The asteroid Team also provides scientific and technical advice to NASA and JPL on asteroid related programs. Work on asteroid classification continued and the discovery of two Earth-approaching M asteroids was published. In the asteroid photometry program researchers obtained N or Q photometry for more than 50 asteroids, including the two M-earth-crossers. Compositional analysis of infrared spectra (0.8 to 2.6 micrometer) of asteroids is continuing. Over the next year the work on asteroid classification and composition will continue with the analysis of the 60 reduced infrared spectra which we now have at hand. The radiometry program will continue with the reduction of the N and Q bandpass data for the 57 asteroids in order to obtain albedos and diameters. This year the emphasis will shift to IRAS follow-up observations; which includes objects not observed by IRAS and objects with poor or peculiar IRAS data. As in previous year, we plan to give top priority to any opportunities for observing near-Earth asteroids and the support (through radiometric lightcurve observations from the IRTF) of any stellar occultations by asteroids for which occultation observation expeditions are fielded. Support of preparing of IRAS data for publication and of D. Matson for his participation in the NASA Planetary Astronomy Management and Operations Working Group will continue.

  10. Performance of district disaster management teams after undergoing an operational level planners' training in Uganda.

    Science.gov (United States)

    Orach, Christopher Garimol; Mayega, Roy William; Woboya, Vincent; William, Bazeyo

    2013-06-01

    Uganda is vulnerable to several natural, man-made and a hybrid of disasters including drought, famine, floods, warfare, and disease outbreaks. We assessed the district disaster team's performance, roles and experiences following the training. The disasters most commonly experienced by the district teams were epidemics of diseases in humans (7 of 12), animals (epizoonotics) (3 of 12) and crops (3 of 12); hailstorms and floods (3 of 12). The capabilities viewed most useful for management of disasters were provision of health care services (9/12) and response management (8 of 12). The capability domains most often consulted during the disasters were general response management (31%), health services (29%) and water and sanitation (17%). The skills areas perceived to be vital following the training were response to epidemics 10/12, disaster management planning 8/12, hazards and vulnerability analysis 7/12 and principles of disaster planning 7/12 respectively. Main challenges mentioned by district teams were inadequacy of finance and logistics, lack of commitment by key partners towards disaster preparedness and response. The most common disaster experienced disasters related to outbreaks of diseases in man, animals and crops. The most frequently applied capabilities were response management and provision of emergency health services. The activities most frequently implemented following disaster management teams training were conducting planning meetings, refinement of plans and dissemination of skills gained. The main challenges were related to limited budget allocations and legal frameworks for disaster management that should be addressed by both central and local governments.

  11. Operations program plan: Revision 3

    International Nuclear Information System (INIS)

    1988-07-01

    This document, the Operations Program Plan (OPP), has been developed as the seven-year master plan for operation of WIPP. The OPP was authorized by the Albuquerque Field Office of the Department of Energy (DOE-AL) and that organization's WIPP Project Office (DOE-WPO) in Carlsbad, New Mexico. The OPP is the directive from the DOE-WPO Project Manager as to how the WIPP is to be managed, operated, and administered. As the top tier management document for WIPP, the OPP establishes organizational responsibilities and an organizational structure for the Waste Isolation Division (WID) of Westinghouse Electric Corporation. The OPP sets policy and tone for conducting WIPP operations; it requires and specifically authorizes implementing documents (e.g., manuals). It has also proven instrumental in the budgeting and planning process, most particularly in expediting the preparation of specific budgets and detailed schedules for each of the numerous work packages. The OPP is also used to communicate information about WIPP operations

  12. Improving Care Teams' Functioning: Recommendations from Team Science.

    Science.gov (United States)

    Fiscella, Kevin; Mauksch, Larry; Bodenheimer, Thomas; Salas, Eduardo

    2017-07-01

    Team science has been applied to many sectors including health care. Yet there has been relatively little attention paid to the application of team science to developing and sustaining primary care teams. Application of team science to primary care requires adaptation of core team elements to different types of primary care teams. Six elements of teams are particularly relevant to primary care: practice conditions that support or hinder effective teamwork; team cognition, including shared understanding of team goals, roles, and how members will work together as a team; leadership and coaching, including mutual feedback among members that promotes teamwork and moves the team closer to achieving its goals; cooperation supported by an emotionally safe climate that supports expression and resolution of conflict and builds team trust and cohesion; coordination, including adoption of processes that optimize efficient performance of interdependent activities among team members; and communication, particularly regular, recursive team cycles involving planning, action, and debriefing. These six core elements are adapted to three prototypical primary care teams: teamlets, health coaching, and complex care coordination. Implementation of effective team-based models in primary care requires adaptation of core team science elements coupled with relevant, practical training and organizational support, including adequate time to train, plan, and debrief. Training should be based on assessment of needs and tasks and the use of simulations and feedback, and it should extend to live action. Teamlets represent a potential launch point for team development and diffusion of teamwork principles within primary care practices. Copyright © 2017 The Joint Commission. Published by Elsevier Inc. All rights reserved.

  13. 77 FR 43488 - Continuity of Operations Plan

    Science.gov (United States)

    2012-07-25

    ...; Order No. 765] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION... Operations Plan to allow the Commission the discretion to better address not only long-term and catastrophic... discretion regarding: the activation and deactivation of the Continuity of Operations Plan and any suspension...

  14. Planning Systems for Distributed Operations

    Science.gov (United States)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  15. Better team management--better team care?

    Science.gov (United States)

    Shelley, P; Powney, B

    1994-01-01

    Team building should not be a 'bolt-on' extra, it should be a well planned, integrated part of developing teams and assisting their leaders. When asked to facilitate team building by a group of NHS managers we developed a framework which enabled individual members of staff to become more effective in the way they communicated with each other, their teams and in turn within the organization. Facing the challenge posed by complex organizational changes, staff were able to use 3 training days to increase and develop their awareness of the principles of teamwork, better team management, and how a process of leadership and team building could help yield better patient care.

  16. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2013-01-01

    This paper explores how the use of sales and operations planning (S&OP) may deal with the challenges set by the planning environment by investigating S&OP at four Scandinavian industrial food producers. Variables connected to the product and market, e.g. perishability, customer service elements...

  17. Strategic conservation planning for the Eastern North Carolina/Southeastern Virginia Strategic Habitat Conservation Team

    Science.gov (United States)

    Alexander-Vaughn, Louise B.; Collazo, Jaime A.; Drew, C. Ashton

    2014-01-01

    The Eastern North Carolina/Southeastern Virginia Strategic Habitat Conservation Team (ENCSEVA) is a partnership among local federal agencies and programs with a mission to apply Strategic Habitat Conservation to accomplish priority landscape-level conservation within its geographic region. ENCSEVA seeks to further landscape-scale conservation through collaboration with local partners. To accomplish this mission, ENCSEVA is developing a comprehensive Strategic Habitat Conservation Plan (Plan) to provide guidance for its members, partners, and collaborators by establishing mutual conservation goals, objectives, strategies, and metrics to gauge the success of conservation efforts. Identifying common goals allows the ENCSEVA team to develop strategies that leverage joint resources and are more likely to achieve desired impacts across the landscape. The Plan will also provide an approach for ENCSEVA to meet applied research needs (identify knowledge gaps), foster adaptive management principles, identify conservation priorities, prioritize threats (including potential impacts of climate change), and identify the required capacity to implement strategies to create more resilient landscapes. ENCSEVA seeks to support the overarching goals of the South Atlantic Landscape Conservation Cooperative (SALCC) and to provide scientific and technical support for conservation at landscape scales as well as inform the management of natural resources in response to shifts in climate, habitat fragmentation and loss, and other landscape-level challenges (South Atlantic LCC 2012). The ENCSEVA ecoregion encompasses the northern third of the SALCC geography and offers a unique opportunity to apply landscape conservation at multiple scales through the guidance of local conservation and natural resource management efforts and by reporting metrics that reflect the effectiveness of those efforts (Figure 1). The Environmental Decision Analysis Team, housed within the North Carolina Cooperative

  18. Site scientific mission plan for the southern great plains CART site January-June 2000.; TOPICAL

    International Nuclear Information System (INIS)

    Peppler, R. A.; Sisterson, D. L.; Lamb, P.

    2001-01-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site was designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This Site Scientific Mission Plan defines the scientific priorities for site activities during the six months beginning on January 1, 2000, and looks forward in less detail to subsequent six-month periods. The primary purpose of this document is to provide scientific guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team[DSIT], Operations Team, and Instrument Team[IT]) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the site program manager, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding. With this issue, many aspects of earlier Site Scientific Mission Plan reports have been moved to ARM sites on the World Wide Web. This report and all previous reports are available on the SGP CART web site

  19. Operational Plan Ontology Model for Interconnection and Interoperability

    Science.gov (United States)

    Long, F.; Sun, Y. K.; Shi, H. Q.

    2017-03-01

    Aiming at the assistant decision-making system’s bottleneck of processing the operational plan data and information, this paper starts from the analysis of the problem of traditional expression and the technical advantage of ontology, and then it defines the elements of the operational plan ontology model and determines the basis of construction. Later, it builds up a semi-knowledge-level operational plan ontology model. Finally, it probes into the operational plan expression based on the operational plan ontology model and the usage of the application software. Thus, this paper has the theoretical significance and application value in the improvement of interconnection and interoperability of the operational plan among assistant decision-making systems.

  20. Web Design for Space Operations: An Overview of the Challenges and New Technologies Used in Developing and Operating Web-Based Applications in Real-Time Operational Support Onboard the International Space Station, in Astronaut Mission Planning and Mission Control Operations

    Science.gov (United States)

    Khan, Ahmed

    2010-01-01

    The International Space Station (ISS) Operations Planning Team, Mission Control Centre and Mission Automation Support Network (MAS) have all evolved over the years to use commercial web-based technologies to create a configurable electronic infrastructure to manage the complex network of real-time planning, crew scheduling, resource and activity management as well as onboard document and procedure management required to co-ordinate ISS assembly, daily operations and mission support. While these Web technologies are classified as non-critical in nature, their use is part of an essential backbone of daily operations on the ISS and allows the crew to operate the ISS as a functioning science laboratory. The rapid evolution of the internet from 1998 (when ISS assembly began) to today, along with the nature of continuous manned operations in space, have presented a unique challenge in terms of software engineering and system development. In addition, the use of a wide array of competing internet technologies (including commercial technologies such as .NET and JAVA ) and the special requirements of having to support this network, both nationally among various control centres for International Partners (IPs), as well as onboard the station itself, have created special challenges for the MCC Web Tools Development Team, software engineers and flight controllers, who implement and maintain this system. This paper presents an overview of some of these operational challenges, and the evolving nature of the solutions and the future use of COTS based rich internet technologies in manned space flight operations. In particular this paper will focus on the use of Microsoft.s .NET API to develop Web-Based Operational tools, the use of XML based service oriented architectures (SOA) that needed to be customized to support Mission operations, the maintenance of a Microsoft IIS web server onboard the ISS, The OpsLan, functional-oriented Web Design with AJAX

  1. Systemic Operational Design: Enhancing the Joint Operation Planning Process

    National Research Council Canada - National Science Library

    Delacruz, Victor J

    2007-01-01

    Operational level commanders and their staffs require relevant and current joint doctrine that articulates the critical function of operational design and its role in the Joint Operation Planning Process (JOPP...

  2. Measuring Situation Awareness of Operating Team in Different Main Control Room Environments of Nuclear Power Plants

    Directory of Open Access Journals (Sweden)

    Seung Woo Lee

    2016-02-01

    Full Text Available Environments in nuclear power plants (NPPs are changing as the design of instrumentation and control systems for NPPs is rapidly moving toward fully digital instrumentation and control, and modern computer techniques are gradually introduced into main control rooms (MCRs. Within the context of these environmental changes, the level of performance of operators in a digital MCR is a major concern. Situation awareness (SA, which is used within human factors research to explain to what extent operators of safety-critical systems know what is transpiring in the system and the environment, is considered a prerequisite factor to guarantee the safe operation of NPPs. However, the safe operation of NPPs can be guaranteed through a team effort. In this regard, the operating team's SA in a conventional and digital MCR should be measured in order to assess whether the new design features implemented in a digital MCR affect this parameter. This paper explains the team SA measurement method used in this study and the results of applying this measurement method to operating teams in different MCR environments. The paper also discusses several empirical lessons learned from the results.

  3. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2015-01-01

    This paper investigates sales and operations planning (S&OP) at four Scandinavian industrial food producers in order to explore how the use of S&OP might help leaders to deal with the challenges set by the planning environment. Variables connected to the product and market, e.g., frequency of new...

  4. 30 CFR 784.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Existing structures. 784.12... PLAN § 784.12 Operation plan: Existing structures. (a) Each application shall contain a description of... and reclamation operation. The description shall include: (1) Location; (2) Plans of the structure...

  5. 30 CFR 780.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Existing structures. 780.12... PLAN § 780.12 Operation plan: Existing structures. (a) Each application shall contain a description of... and reclamation operation. The description shall include— (1) Location; (2) Plans of the structure...

  6. Simulation-based multidisciplinary team training decreases time to critical operations for trauma patients.

    Science.gov (United States)

    Murphy, Margaret; Curtis, Kate; Lam, Mary K; Palmer, Cameron S; Hsu, Jeremy; McCloughen, Andrea

    2018-05-01

    Simulation has been promoted as a platform for training trauma teams. However, it is not clear if this training has an impact on health service delivery and patient outcomes. This study evaluates the association between implementation of a simulation based multidisciplinary trauma team training program at a metropolitan trauma centre and subsequent patient outcomes. This was a retrospective review of trauma registry data collected at an 850-bed Level 1 Adult Trauma Centre in Sydney, Australia. Two concurrent four-year periods, before and after implementation of a simulation based multidisciplinary trauma team training program were compared for differences in time to critical operations, Emergency Department (ED) length of stay (LOS) and patient mortality. There were 2389 major trauma patients admitted to the hospital during the study, 1116 in the four years preceding trauma team training (the PREgroup) and 1273 in the subsequent 4 years (the POST group). There were no differences between the groups with respect to gender, body region injured, incidence of polytrauma, and pattern of arrival to ED. The POST group was older (median age 54 versus 43 years, p team training was associated with a reduction in time to critical operation while overall ED length of stay increased. Simulation is promoted as a platform for training teams; but the complexity of trauma care challenges efforts to demonstrate direct links between multidisciplinary team training and improved outcomes. There remain considerable gaps in knowledge as to how team training impacts health service delivery and patient outcomes. Retrospective comparative therapeutic/care management study, Level III evidence. Crown Copyright © 2018. Published by Elsevier Ltd. All rights reserved.

  7. Research and development portfolio of the sustainability science team national sustainable operations USDA Forest Service

    Science.gov (United States)

    Trista Patterson; David Nicholls; Jonathan Long

    2015-01-01

    The Sustainability Science Team (SST) of the U.S. Department of Agriculture (USDA) Forest Service Sustainable Operations Initiative is a 18-member virtual research and development team, located across five regions and four research stations of the USDA Forest Service. The team provides research, publication, systems analysis, and decision support to the Sustainable...

  8. Creating and supporting a mixed methods health services research team.

    Science.gov (United States)

    Bowers, Barbara; Cohen, Lauren W; Elliot, Amy E; Grabowski, David C; Fishman, Nancy W; Sharkey, Siobhan S; Zimmerman, Sheryl; Horn, Susan D; Kemper, Peter

    2013-12-01

    To use the experience from a health services research evaluation to provide guidance in team development for mixed methods research. The Research Initiative Valuing Eldercare (THRIVE) team was organized by the Robert Wood Johnson Foundation to evaluate The Green House nursing home culture change program. This article describes the development of the research team and provides insights into how funders might engage with mixed methods research teams to maximize the value of the team. Like many mixed methods collaborations, the THRIVE team consisted of researchers from diverse disciplines, embracing diverse methodologies, and operating under a framework of nonhierarchical, shared leadership that required new collaborations, engagement, and commitment in the context of finite resources. Strategies to overcome these potential obstacles and achieve success included implementation of a Coordinating Center, dedicated time for planning and collaborating across researchers and methodologies, funded support for in-person meetings, and creative optimization of resources. Challenges are inevitably present in the formation and operation of effective mixed methods research teams. However, funders and research teams can implement strategies to promote success. © Health Research and Educational Trust.

  9. Operation and Maintenance Plan for the 300-FF-5 Operable Unit

    International Nuclear Information System (INIS)

    Singleton, K.M.

    1996-09-01

    This document is the operation and maintenance plan for the 300-FF-5 groundwater operable unit. The purpose of this plan is to identify tasks necessary to verify the effectiveness of the selected alternative. This plan also describes the monitoring program and administrative tasks that will be used as the preferred alternative for the remediation of groundwater in the 300-FF-5 Operable Unit. The preferred alternative selected for remediation of groundwater consists of institutional controls

  10. 14 CFR 380.33a - Operator's option plan.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Operator's option plan. 380.33a Section 380... option plan. (a) For the purposes of this part, an operator's option plan contract that states... flight leg. (b) Operator's option plan contracts shall state, in addition to the information required by...

  11. 77 FR 41107 - Decommissioning Planning During Operations

    Science.gov (United States)

    2012-07-12

    ..., 40, 50, 70, and 72 [NRC-2011-0162] Decommissioning Planning During Operations AGENCY: Nuclear... (DG) 4014, ``Decommissioning Planning During Operations.'' This guide describes a method that the NRC staff considers acceptable for use in complying with the NRC's Decommissioning Planning Rule. The NRC...

  12. 76 FR 77431 - Decommissioning Planning During Operations

    Science.gov (United States)

    2011-12-13

    ... (DG) DG-4014, ``Decommissioning Planning During Operations.'' This guide describes a method that the.... The draft regulatory guide entitled, ``Decommissioning Planning During Operations,'' is temporarily..., 40, 50, 70, and 72 RIN 3150-AI55 [NRC-2011-0286; NRC-2008-0030] Decommissioning Planning During...

  13. 78 FR 663 - Decommissioning Planning During Operations

    Science.gov (United States)

    2013-01-04

    ...] Decommissioning Planning During Operations AGENCY: Nuclear Regulatory Commission. ACTION: Regulatory guide..., ``Decommissioning Planning During Operations.'' The guide describes a method that the NRC staff considers acceptable for use by holders of licenses in complying with the NRC's Decommissioning Planning Rule (DPR) (76 FR...

  14. Simulation-based decision support for evaluating operational plans

    Directory of Open Access Journals (Sweden)

    Johan Schubert

    2015-12-01

    Full Text Available In this article, we describe simulation-based decision support techniques for evaluation of operational plans within effects-based planning. Using a decision support tool, developers of operational plans are able to evaluate thousands of alternative plans against possible courses of events and decide which of these plans are capable of achieving a desired end state. The objective of this study is to examine the potential of a decision support system that helps operational analysts understand the consequences of numerous alternative plans through simulation and evaluation. Operational plans are described in the effects-based approach to operations concept as a set of actions and effects. For each action, we examine several different alternative ways to perform the action. We use a representation where a plan consists of several actions that should be performed. Each action may be performed in one of several different alternative ways. Together these action alternatives make up all possible plan instances, which are represented as a tree of action alternatives that may be searched for the most effective sequence of alternative actions. As a test case, we use an expeditionary operation with a plan of 43 actions and several alternatives for these actions, as well as a scenario of 40 group actors. Decision support for planners is provided by several methods that analyze the impact of a plan on the 40 actors, e.g., by visualizing time series of plan performance. Detailed decision support for finding the most influential actions of a plan is presented by using sensitivity analysis and regression tree analysis. Finally, a decision maker may use the tool to determine the boundaries of an operation that it must not move beyond without risk of drastic failure. The significant contribution of this study is the presentation of an integrated approach for evaluation of operational plans.

  15. Improving supervision: a team approach.

    Science.gov (United States)

    1993-01-01

    This issue of "The Family Planning Manager" outlines an interactive team supervision strategy as a means of improving family planning service quality and enabling staff to perform to their maximum potential. Such an approach to supervision requires a shift from a monitoring to a facilitative role. Because supervisory visits to the field are infrequent, the regional supervisor, clinic manager, and staff should form a team to share ongoing supervisory responsibilities. The team approach removes individual blame and builds consensus. An effective team is characterized by shared leadership roles, concrete work problems, mutual accountability, an emphasis on achieving team objectives, and problem resolution within the group. The team supervision process includes the following steps: prepare a visit plan and schedule; meet with the clinic manager and staff to explain how the visit will be conducted; supervise key activity areas (clinical, management, and personnel); conduct a problem-solving team meeting; conduct a debriefing meeting with the clinic manager; and prepare a report on the visit, including recommendations and follow-up plans. In Guatemala's Family Planning Unit, teams identify problem areas on the basis of agreement that a problem exists, belief that the problem can be solved with available resources, and individual willingness to accept responsibility for the specific actions identified to correct the problem.

  16. Model for Team Training Using the Advanced Trauma Operative Management Course: Pilot Study Analysis.

    Science.gov (United States)

    Perkins, R Serene; Lehner, Kathryn A; Armstrong, Randy; Gardiner, Stuart K; Karmy-Jones, Riyad C; Izenberg, Seth D; Long, William B; Wackym, P Ashley

    2015-01-01

    Education and training of surgeons has traditionally focused on the development of individual knowledge, technical skills, and decision making. Team training with the surgeon's operating room staff has not been prioritized in existing educational paradigms, particularly in trauma surgery. We aimed to determine whether a pilot curriculum for surgical technicians and nurses, based on the American College of Surgeons' Advanced Trauma Operative Management (ATOM) course, would improve staff knowledge if conducted in a team-training environment. Between December 2012 and December 2014, 22 surgical technicians and nurses participated in a curriculum complementary to the ATOM course, consisting of 8 individual 8-hour training sessions designed by and conducted at our institution. Didactic and practical sessions included educational content, hands-on instruction, and alternating role play during 5 system-specific injury scenarios in a simulated operating room environment. A pre- and postcourse examination was administered to participants to assess for improvements in team members' didactic knowledge. Course participants displayed a significant improvement in didactic knowledge after working in a team setting with trauma surgeons during the ATOM course, with a 9-point improvement on the postcourse examination (83%-92%, p = 0.0008). Most participants (90.5%) completing postcourse surveys reported being "highly satisfied" with course content and quality after working in our simulated team-training setting. Team training is critical to improving the knowledge base of surgical technicians and nurses in the trauma operative setting. Improved communication, efficiency, appropriate equipment use, and staff awareness are the desired outcomes when shifting the paradigm from individual to surgical team training so that improved patient outcomes, decreased risk, and cost savings can be achieved. Determine whether a pilot curriculum for surgical technicians and nurses, based on the

  17. Effective operational oil spill response planning

    International Nuclear Information System (INIS)

    Meyers, R.J.

    1991-01-01

    An operational Contingency Plan is one of the single most important aspects of effective oil spill response operations. It is a spill control game plan. A thorough contingency plan provides a set of guidelines that can be used to help direct all phases of spill response activities. More than simple a compilation of lists and rosters, the contingency plan reflects strategic and philosophical elements of spill response that help to ensure a viable response to any spill incident. Facilities and oil carrying vessels should have well maintained contingency plans with these features. This paper describes the requirement for effective oil spill response pans and the training required to exercise them

  18. Team interaction skills evaluation criteria for nuclear power plant control room operators

    International Nuclear Information System (INIS)

    Montgomery, J.C.; Hauth, J.T.

    1991-01-01

    Team interaction skills are an essential aspect of safe nuclear power plant control room operations. Previous research has shown that, when a group works together, rather than as individuals, more effective operations are possible. However, little research has addressed how such team interaction skills can be measured. In this study rating scales were developed specifically for such a measurement purpose. Dimensions of team skill performance were identified from previous research and experience in the area, incorporating the input of Pacific Northwest Laboratory (PNL) contract operator licensing examiners. Rating scales were developed on the basis of these dimensions, incorporating a modified Behaviorally Anchored Rating Scale (BARS) as well as Behavioral Frequency formats. After a pilot-testing/revision process, rating data were collected using 11 control room crews responding to simulator scenarios at a boiling water and a pressurized water reactor. Statistical analyses of the resulting data revealed moderate inter-rater reliability using the Behavioral Frequency scales, relatively low inter-rater reliability using the BARS, and moderate support for convergent and discriminant validity of the scales. It was concluded that the scales show promise psychometrically and in terms of user acceptability, but that additional scale revision is needed before field implementation. Recommendations for scale revision and directions for future research were presented

  19. Geometric Reasoning for Automated Planning

    Science.gov (United States)

    Clement, Bradley J.; Knight, Russell L.; Broderick, Daniel

    2012-01-01

    An important aspect of mission planning for NASA s operation of the International Space Station is the allocation and management of space for supplies and equipment. The Stowage, Configuration Analysis, and Operations Planning teams collaborate to perform the bulk of that planning. A Geometric Reasoning Engine is developed in a way that can be shared by the teams to optimize item placement in the context of crew planning. The ISS crew spends (at the time of this writing) a third or more of their time moving supplies and equipment around. Better logistical support and optimized packing could make a significant impact on operational efficiency of the ISS. Currently, computational geometry and motion planning do not focus specifically on the optimized orientation and placement of 3D objects based on multiple distance and containment preferences and constraints. The software performs reasoning about the manipulation of 3D solid models in order to maximize an objective function based on distance. It optimizes for 3D orientation and placement. Spatial placement optimization is a general problem and can be applied to object packing or asset relocation.

  20. A planning concept incorporating the knowledge of both planning and operations personnel

    Energy Technology Data Exchange (ETDEWEB)

    Valenca, M M; Nepomuceno, L; Teixeira, J C.F.; Santos, Junior, A [Universidade Estadual de Campinas, SP (Brazil)

    1994-12-31

    In this paper, the electrical operation planning problem and the available technological possibilities for the improvement of planner`s work process are analyzed. The importance of the expert`s experience in efficient operation plans production is pointed out. The useful knowledge in planning and operating environments and their automation by Artificial Intelligence techniques are evaluated. Finally, conception of a decision-making support system allowing the interaction of storage expertise with analysis programs proposed, in order to improve the planning process. (author) 15 refs., 4 figs.

  1. Cyber as a Team Sport: Operationalizing a Whole-Of-Government Approach to Cyberspace Operations

    Science.gov (United States)

    2011-06-07

    July 2010-7 June 2011 4. TITLE AND SUBTITLE • -~ ·- ~ I 5a. CONTRACT NUMBER CYBER AS A "TEAM SPORT ": OPERATIONALIZING A WHOLE-OF-GOVERNMENT APPROACH...JOINT FORCES STAFF COLLEGE JOINT ADVANCED WARFIGHTING SCHOOL CYBER AS A “TEAM SPORT ”: OPERATIONALIZING A WHOLE-OF- GOVERNMENT APPROACH...TO CYBERSPACE OPERATIONS by Elizabeth A. Myers Department of Defense CYBER AS A "TEAM SPORT ": OPERATIONALIZING A WHOLE-OF· GOVERNMENT

  2. Operation Chromite: Amphibious Planning

    OpenAIRE

    2005-01-01

    tut present Tutorial Presentation Interactive Media Element This interactive tutorial covers the Inchon landing case study that provides several good examples of the types of decisions made during the amphibious planning process, and how they compare to the current matrix of the ten primary decisions for amphibious operation required today by joint doctrine. Operation Chromite is used as an example. 8808A Warfighting from the Sea: Amphibious Operations

  3. Zouerate 1978: Supporting Air Operations, an Army Team Amidst France's African Strategy

    National Research Council Canada - National Science Library

    Voute, Philippe

    1997-01-01

    .... To help this country, in 1977-1978, France carried out operation Lamantin. It consisted of surveillance and attack aircraft stationed in Senegal, and small Army teams deployed in Mauritanian garrisons...

  4. Development and validation of a heuristic model for evaluation of the team performance of operators in nuclear power plants

    International Nuclear Information System (INIS)

    Kim, Sa Kil; Byun, Seong Nam; Lee, Dhong Hoon

    2011-01-01

    Highlights: → We develop an estimation model for evaluation of the team performance of MCR. → To build the model, we extract team performance factors through reviewing literatures and identifying behavior markers. → We validate that the model is adaptable to the advanced MCR of nuclear power plants. → As a result, we find that the model is a systematic and objective to measure team performance. - Abstract: The global concerns about safety in the digital technology of the main control room (MCR) are growing as domestic and foreign nuclear power plants are developed with computerized control facilities and human-system interfaces. In a narrow space, the digital technology contributes to a control room environment, which can facilitate the acquisition of all the information needed for operation. Thus, although an individual performance of the advanced MCR can be further improved; there is a limit in expecting an improvement in team performance. The team performance depends on organic coherence as a whole team rather than on the knowledge and skill of an individual operator. Moreover, a good team performance improves communication between and within teams in an efficient manner, and then it can be conducive to addressing unsafe conditions. Respecting this, it is important and necessary to develop methodological technology for the evaluation of operators' teamwork or collaboration, thus enhancing operational performance in nuclear power plant at the MCR. The objectives of this research are twofold: to develop a systematic methodology for evaluation of the team performance of MCR operators in consideration of advanced MCR characteristics, and to validate that the methodology is adaptable to the advanced MCR of nuclear power plants. In order to achieve these two objectives, first, team performance factors were extracted through literature reviews and methodological study concerning team performance theories. Second, the team performance factors were identified and

  5. 30 CFR 784.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 784.11... PLAN § 784.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  6. 30 CFR 780.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 780.11... PLAN § 780.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  7. WIPP operations planning: an overview

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Cossel, S.C.; Plung, D.L.

    1985-01-01

    The Waste Isolation Pilot Plant (WIPP) is the first-of-a-kind facility for emplacement of radioactive waste in a geologic repository. The concern for safe and efficient operations - coupled with the domestic and international significance of this project - necessitates that WIPP be a ''model plant.'' To develop WIPP as a model plant, a unique planning methodology was employed to identify, evaluate, incorporate, and implement these elements that together will form the best possible overall operation. The resulting improvements in communication among project participants and the smooth transition being made from construction are equally attributable to the methodology employed and the operating program plan developed. 1 fig

  8. A distributed planning concept for Space Station payload operations

    Science.gov (United States)

    Hagopian, Jeff; Maxwell, Theresa; Reed, Tracey

    1994-01-01

    The complex and diverse nature of the payload operations to be performed on the Space Station requires a robust and flexible planning approach. The planning approach for Space Station payload operations must support the phased development of the Space Station, as well as the geographically distributed users of the Space Station. To date, the planning approach for manned operations in space has been one of centralized planning to the n-th degree of detail. This approach, while valid for short duration flights, incurs high operations costs and is not conducive to long duration Space Station operations. The Space Station payload operations planning concept must reduce operations costs, accommodate phased station development, support distributed users, and provide flexibility. One way to meet these objectives is to distribute the planning functions across a hierarchy of payload planning organizations based on their particular needs and expertise. This paper presents a planning concept which satisfies all phases of the development of the Space Station (manned Shuttle flights, unmanned Station operations, and permanent manned operations), and the migration from centralized to distributed planning functions. Identified in this paper are the payload planning functions which can be distributed and the process by which these functions are performed.

  9. 7 CFR 1466.9 - EQIP plan of operations.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false EQIP plan of operations. 1466.9 Section 1466.9... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS ENVIRONMENTAL QUALITY INCENTIVES PROGRAM General Provisions § 1466.9 EQIP plan of operations. (a) All conservation practices in the EQIP plan of...

  10. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  11. [Practical aspects of implementation quality management system ISO 9001:2000 by hospital infection control team].

    Science.gov (United States)

    Kuziemski, Arkadiusz; Czerniak, Beata; Frankowska, Krystyna; Gonia, Ewa; Salińska, Teresa; Motuk, Andrzej; Sobociński, Zbigniew

    2009-01-01

    In 2006 the Board of the Jan Biziel Hospital in Bydgoszcz decided to include procedures of health services in the implementation process within the confines of ISO 9001:2000 certification. The hospital infection control team that has operated in the hospital since 1989 performed the analysis of the forms of activities to date and on that basis the team prepared original plan of quality management. In April 2007, this plan was successfully accepted by the certifying team. The aim of this study is to present the aforementioned plan which is the result of 18 years experience of the team. At the same time, I hope that this study will be very helpful for all professionals interested in hospital epidemiology, especially in the context of implementing quality management systems.

  12. Interactive orbital proximity operations planning system

    Science.gov (United States)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1990-01-01

    An interactive graphical planning system for on-site planning of proximity operations in the congested multispacecraft environment about the space station is presented. The system shows the astronaut a bird's eye perspective of the space station, the orbital plane, and the co-orbiting spacecraft. The system operates in two operational modes: (1) a viewpoint mode, in which the astronaut is able to move the viewpoint around in the orbital plane to range in on areas of interest; and (2) a trajectory design mode, in which the trajectory is planned. Trajectory design involves the composition of a set of waypoints which result in a fuel-optimal trajectory which satisfies all operational constraints, such as departure and arrival constraints, plume impingement constraints, and structural constraints. The main purpose of the system is to present the trajectory and the constraints in an easily interpretable graphical format. Through a graphical interactive process, the trajectory waypoints are edited until all operational constraints are satisfied. A series of experiments was conducted to evaluate the system. Eight airline pilots with no prior background in orbital mechanics participated in the experiments. Subject training included a stand-alone training session of about 6 hours duration, in which the subjects became familiar with orbital mechanics concepts and performed a series of exercises to familiarize themselves with the control and display features of the system. They then carried out a series of production runs in which 90 different trajectory design situations were randomly addressed. The purpose of these experiments was to investigate how the planning time, planning efforts, and fuel expenditures were affected by the planning difficulty. Some results of these experiments are presented.

  13. Science Planning and Orbit Classification for Solar Probe Plus

    Science.gov (United States)

    Kusterer, M. B.; Fox, N. J.; Rodgers, D. J.; Turner, F. S.

    2016-12-01

    There are a number of challenges for the Science Planning Team (SPT) of the Solar Probe Plus (SPP) Mission. Since SPP is using a decoupled payload operations approach, tight coordination between the mission operations and payload teams will be required. The payload teams must manage the volume of data that they write to the spacecraft solid-state recorders (SSR) for their individual instruments for downlink to the ground. Making this process more difficult, the geometry of the celestial bodies and the spacecraft during some of the SPP mission orbits cause limited uplink and downlink opportunities. The payload teams will also be required to coordinate power on opportunities, command uplink opportunities, and data transfers from instrument memory to the spacecraft SSR with the operation team. The SPT also intend to coordinate observations with other spacecraft and ground based systems. To solve these challenges, detailed orbit activity planning is required in advance for each orbit. An orbit planning process is being created to facilitate the coordination of spacecraft and payload activities for each orbit. An interactive Science Planning Tool is being designed to integrate the payload data volume and priority allocations, spacecraft ephemeris, attitude, downlink and uplink schedules, spacecraft and payload activities, and other spacecraft ephemeris. It will be used during science planning to select the instrument data priorities and data volumes that satisfy the orbit data volume constraints and power on, command uplink and data transfer time periods. To aid in the initial stages of science planning we have created an orbit classification scheme based on downlink availability and significant science events. Different types of challenges arise in the management of science data driven by orbital geometry and operational constraints, and this scheme attempts to identify the patterns that emerge.

  14. Development of an Objective Measurement Method for Situation Awareness of Operation Teams in NPPs

    International Nuclear Information System (INIS)

    Lee, Seung Woo; Kim, Ar Ryum; Kim, Hyoung Ju; Seong, Poong Hyun; Park, Jin Kyun

    2011-01-01

    Situation awareness (SA) continues to receive a considerable amount of attention from the ergonomics community since the need for operators to maintain SA is frequently cited as a key to effective and efficient performance. Even though complex and dynamic environments such as main control room (MCR) in the nuclear power plants (NPPs) is operated in teams and still SA which teams posses is important, research is currently focused on individual SA not for team situation awareness (TSA). Since there are not many measurement methods developed for TSA, individual SA measurement methods are at first reviewed and the critical requirements which new TSA measurements should consider are derived. With an assumption that TSA is an integration of individual SA, a new and objective TSA measurement method is developed. This method is developed mainly based on logical connections between TSA and team communication and implements verbal protocol analysis. This method provides measure for each level of TSA. By performing preliminary analysis with this method, it was shown that this method is feasible to some extent

  15. Development of an Objective Measurement Method for Situation Awareness of Operation Teams in NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Seung Woo; Kim, Ar Ryum; Kim, Hyoung Ju; Seong, Poong Hyun [KAIST, Daejeon (Korea, Republic of); Park, Jin Kyun [KAERI, Daejeon (Korea, Republic of)

    2011-08-15

    Situation awareness (SA) continues to receive a considerable amount of attention from the ergonomics community since the need for operators to maintain SA is frequently cited as a key to effective and efficient performance. Even though complex and dynamic environments such as main control room (MCR) in the nuclear power plants (NPPs) is operated in teams and still SA which teams posses is important, research is currently focused on individual SA not for team situation awareness (TSA). Since there are not many measurement methods developed for TSA, individual SA measurement methods are at first reviewed and the critical requirements which new TSA measurements should consider are derived. With an assumption that TSA is an integration of individual SA, a new and objective TSA measurement method is developed. This method is developed mainly based on logical connections between TSA and team communication and implements verbal protocol analysis. This method provides measure for each level of TSA. By performing preliminary analysis with this method, it was shown that this method is feasible to some extent.

  16. Relationships among Team Trust, Team Cohesion, Team Satisfaction and Project Team Effectiveness as Perceived by Project Managers in Malaysia

    OpenAIRE

    Han-Ping Fung

    2014-01-01

    Today, more and more project teams are formed to achieve organizational objectives as organizations generally recognized the importance and benefits of project teams. There is a compelling reason to study what are the team outcome factors that can predict project team effectiveness as it is unclear whether these team outcome factors can yield the same result in project setting whereby there is resource and time constraint compare to normal work teams which are ongoing and operational in natur...

  17. NASA Operational Environment Team (NOET): NASA's key to environmental technology

    Science.gov (United States)

    Cook, Beth

    1993-01-01

    NASA has stepped forward to face the environmental challenge to eliminate the use of Ozone-Layer Depleting Substances (OLDS) and to reduce our Hazardous Air Pollutants (HAP) by 50 percent in 1995. These requirements have been issued by the Clean Air Act, the Montreal Protocol, and various other legislative acts. A proactive group, the NASA Operational Environment Team or NOET, received its charter in April 1992 and was tasked with providing a network through which replacement activities and development experiences can be shared. This is a NASA-wide team which supports the research and development community by sharing information both in person and via a computerized network, assisting in specification and standard revisions, developing cleaner propulsion systems, and exploring environmentally-compliant alternatives to current processes.

  18. Astrophysics science operations - Near-term plans and vision

    Science.gov (United States)

    Riegler, Guenter R.

    1991-01-01

    Astrophysics science operations planned by the Science Operations branch of NASA Astrophysics Division for the 1990s for the purpose of gathering spaceborne astronomical data are described. The paper describes the near-future plans of the Science Operations in the areas of the preparation of the proposal; the planning and execution of spaceborne observations; the collection, processing, and analysis data; and the dissemination of results. Also presented are concepts planned for introduction at the beginning of the 20th century, including the concepts of open communications, transparent instrument and observatory operations, a spiral requirements development method, and an automated research assistant.

  19. Strategy Planning Visualization Tool (SPVT) for the Air Operations Center (AOC) Volume I: SPVT Summary and COA Sketch

    Science.gov (United States)

    2009-12-01

    communication events to a specific team member or device, the time to create a product, or a planner’s workload via the NASA TLX . Qualitative metrics...HPW/RHXB, Commander’s Predictive Environment program – SMART), IWPC (GDAIS), Capt. DuBose and Mr. Matt Trippy ESC 950th ELSG Joint IO Planning...primary visualization and information components unique to GEM-S include Operations, Activities & Actions (OAA), Lines of Effects (LOE), IO Assessment

  20. Corrective Action Plan in response to the March 1992 Tiger Team Assessment of the Ames Laboratory

    International Nuclear Information System (INIS)

    1992-01-01

    On March 5, 1992, a Department of Energy (DOE) Tiger Team completed an assessment of the Ames Laboratory, located in Ames, Iowa. The purpose of the assessment was to provide the Secretary of Energy with a report on the status and performance of Environment, Safety and Health (ES ampersand H) programs at Ames Laboratory. Detailed findings of the assessment are presented in the report, DOE/EH-0237, Tiger Team Assessment of the Ames Laboratory. This document, the Ames Laboratory Corrective Action Plan (ALCAP), presents corrective actions to overcome deficiencies cited in the Tiger Team Assessment. The Tiger Team identified 53 Environmental findings, from which the Team derived four key findings. In the Safety and Health (S ampersand H) area, 126 concerns were identified, eight of which were designated Category 11 (there were no Category I concerns). Seven key concerns were derived from the 126 concerns. The Management Subteam developed 19 findings which have been summarized in four key findings. The eight S ampersand H Category 11 concerns identified in the Tiger Team Assessment were given prompt management attention. Actions to address these deficiencies have been described in individual corrective action plans, which were submitted to DOE Headquarters on March 20, 1992. The ALCAP includes actions described in this early response, as well as a long term strategy and framework for correcting all remaining deficiencies. Accordingly, the ALCAP presents the organizational structure, management systems, and specific responses that are being developed to implement corrective actions and to resolve root causes identified in the Tiger Team Assessment. The Chicago Field Office (CH), IowaState University (ISU), the Institute for Physical Research and Technology (IPRT), and Ames Laboratory prepared the ALCAP with input from the DOE Headquarters, Office of Energy Research (ER)

  1. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  2. System Planning With The Hanford Waste Operations Simulator

    International Nuclear Information System (INIS)

    Crawford, T.W.; Certa, P.J.; Wells, M.N.

    2010-01-01

    At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

  3. Integrated formal operations plan

    Energy Technology Data Exchange (ETDEWEB)

    Cort, G.; Dearholt, W.; Donahue, S.; Frank, J.; Perkins, B.; Tyler, R.; Wrye, J.

    1994-01-05

    The concept of formal operations (that is, a collection of business practices to assure effective, accountable operations) has vexed the Laboratory for many years. To date most attempts at developing such programs have been based upon rigid, compliance-based interpretations of a veritable mountain of Department of Energy (DOE) orders, directives, notices, and standards. These DOE dictates seldom take the broad view but focus on highly specialized programs isolated from the overall context of formal operations. The result is a confusing array of specific, and often contradictory, requirements that produce a patchwork of overlapping niche programs. This unnecessary duplication wastes precious resources, dramatically increases the complexity of our work processes, and communicates a sense of confusion to our customers and regulators. Coupled with the artificial divisions that have historically existed among the Laboratory`s formal operations organizations (quality assurance, configuration management, records management, training, etc.), this approach has produced layers of increasingly vague and complex formal operations plans, each of which interprets its parent and adds additional requirements of its own. Organizational gridlock ensues whenever an activity attempts to implement these bureaucratic monstrosities. The integrated formal operations plan presented is to establish a set of requirements that must be met by an integrated formal operations program, assign responsibilities for implementation and operation of the program, and specify criteria against which the performance of the program will be measured. The accountable line manager specifies the items, processes, and information (the controlled elements) to which the formal operations program specified applies. The formal operations program is implemented using a graded approach based on the level of importance of the various controlled elements and the scope of the activities in which they are involved.

  4. 14 CFR 136.13 - Helicopter performance plan and operations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Helicopter performance plan and operations... Helicopter performance plan and operations. (a) Each operator must complete a performance plan before each helicopter commercial air tour, or flight operated under 14 CFR 91.146 or 91.147. The pilot in command must...

  5. Test, Control and Monitor System (TCMS) operations plan

    Science.gov (United States)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  6. Enhancing Cassini Operations & Science Planning Tools

    Science.gov (United States)

    Castello, Jonathan

    2012-01-01

    The Cassini team uses a variety of software utilities as they manage and coordinate their mission to Saturn. Most of these tools have been unchanged for many years, and although stability is a virtue for long-lived space missions, there are some less-fragile tools that could greatly benefit from modern improvements. This report shall describe three such upgrades, including their architectural differences and their overall impact. Emphasis is placed on the motivation and rationale behind architectural choices rather than the final product, so as to illuminate the lessons learned and discoveries made.These three enhancements included developing a strategy for migrating Science Planning utilities to a new execution model, rewriting the team's internal portal for ease of use and maintenance, and developing a web-based agenda application for tracking the sequence of files being transmitted to the Cassini spacecraft. Of this set, the first two have been fully completed, while the agenda application is currently in the early prototype stage.

  7. Runway Operations Planning: A Two-Stage Solution Methodology

    Science.gov (United States)

    Anagnostakis, Ioannis; Clarke, John-Paul

    2003-01-01

    The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. Thus, Runway Operations Planning (ROP) is a critical component of airport operations planning in general and surface operations planning in particular. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, may be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. Generating optimal runway operations plans was approached in with a 'one-stage' optimization routine that considered all the desired objectives and constraints, and the characteristics of each aircraft (weight class, destination, Air Traffic Control (ATC) constraints) at the same time. Since, however, at any given point in time, there is less uncertainty in the predicted demand for departure resources in terms of weight class than in terms of specific aircraft, the ROP problem can be parsed into two stages. In the context of the Departure Planner (OP) research project, this paper introduces Runway Operations Planning (ROP) as part of the wider Surface Operations Optimization (SOO) and describes a proposed 'two stage' heuristic algorithm for solving the Runway Operations Planning (ROP) problem. Focus is specifically given on including runway crossings in the planning process of runway operations. In the first stage, sequences of departure class slots and runwy crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the

  8. 77 FR 8751 - Guidance for Decommissioning Planning During Operations

    Science.gov (United States)

    2012-02-15

    ..., 40, 50, 70, and 72 [NRC-2011-0286] Guidance for Decommissioning Planning During Operations AGENCY... Guide, DG-4014, ``Decommissioning Planning During Operations'' in the Federal Register with a public... Guide DG-4014, ``Decommissioning Planning During Operations.'' This DG refers to NUREG-1757 Volume 3...

  9. Flight Planning Branch NASA Co-op Tour

    Science.gov (United States)

    Marr, Aja M.

    2013-01-01

    This semester I worked with the Flight Planning Branch at the NASA Johnson Space Center. I learned about the different aspects of flight planning for the International Space Station as well as the software that is used internally and ISSLive! which is used to help educate the public on the space program. I had the opportunity to do on the job training in the Mission Control Center with the planning team. I transferred old timeline records from the planning team's old software to the new software in order to preserve the data for the future when the software is retired. I learned about the operations of the International Space Station, the importance of good communication between the different parts of the planning team, and enrolled in professional development classes as well as technical classes to learn about the space station.

  10. Planning and management of change

    International Nuclear Information System (INIS)

    Nelson, R.M. Jr.; Statton, C.T.; St. Clair, R.K.

    1994-01-01

    The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, a high priority has been placed upon making changes which enable the federal leadership to exercise appropriate control and make participants more responsible and accountable for their work. Transition to the new organization will be implemented in four phases: (1) establishing the management construct, (2) defining roles and responsibilities of functional management, (3) development of the task performance teams, and (4) subsequent evolution of the open-quotes project teamclose quotes as a whole. A program-wide strategic plan is being prepared which includes a variety of revisions to the program of the past. This plan charts the path the Department will follow in fulfilling its mission. The vision of the new management developed by the DOE focuses on the creation of open-quotes teams,close quotes both a management team and task performance teams. The new management team will be tasked with implementing the plan

  11. The Role of the Pulmonary Embolism Response Team: How to Build One, Who to Include, Scenarios, Organization, and Algorithms.

    Science.gov (United States)

    Galmer, Andrew; Weinberg, Ido; Giri, Jay; Jaff, Michael; Weinberg, Mitchell

    2017-09-01

    Pulmonary embolism response teams (PERTs) are multidisciplinary response teams aimed at delivering a range of diagnostic and therapeutic modalities to patients with pulmonary embolism. These teams have gained traction on a national scale. However, despite sharing a common goal, individual PERT programs are quite individualized-varying in their methods of operation, team structures, and practice patterns. The tendency of such response teams is to become intensely structured, algorithmic, and inflexible. However, in their current form, PERT programs are quite the opposite. They are being creatively customized to meet the needs of the individual institution based on available resources, skills, personnel, and institutional goals. After a review of the essential core elements needed to create and operate a PERT team in any form, this article will discuss the more flexible feature development of the nascent PERT team. These include team planning, member composition, operational structure, benchmarking, market analysis, and rudimentary financial operations. Copyright © 2017 Elsevier Inc. All rights reserved.

  12. 10 CFR 436.102 - General operations plan format and content.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false General operations plan format and content. 436.102... PROGRAMS Guidelines for General Operations Plans § 436.102 General operations plan format and content. (a... effective date of these guidelines, a general operations 10-year plan which shall consist of two parts, an...

  13. Hazardous waste operational plan for site 300

    International Nuclear Information System (INIS)

    Roberts, R.S.

    1982-01-01

    This plan outlines the procedures and operations used at LLNL's Site 300 for the management of the hazardous waste generated. This waste consists primarily of depleted uranium (a by-product of U-235 enrichment), beryllium, small quantities of analytical chemicals, industrial type waste such as solvents, cleaning acids, photographic chemicals, etc., and explosives. This plan details the operations generating this waste, the proper handling of this material and the procedures used to treat or dispose of the hazardous waste. A considerable amount of information found in this plan was extracted from the Site 300 Safety and Operational Manual written by Site 300 Facility personnel and the Hazards Control Department

  14. Zero Gravity Flights as the Most Effective Embryonic Operation for Planned Commercial Spaceport

    Science.gov (United States)

    Abu Samah, Shamsul Kamar; Ridzuan Zakaria, Norul; Nasrun, Nasri; Abu, Jalaluddin; Muszaphar Shukor, Dato'Sheikh

    2013-09-01

    From the experience gained by the management team of Spaceport Malaysia, a popular service that can be provided by a planned commercial spaceport in a country without existing space travel infrastructure are zero gravity flights. Zero gravity flights range from parabolic flights using aerobatic airplane to suborbital flights using rockets, and in the near future using suborbital rocketplanes. Therefore, zero gravity flights can be operated from a certified runway or planned for operation at a future commercial spaceport. With such range of operation, zero gravity flights provide a natural link between a low cost operation of small airplane to exclusive high profile operation of suborbital rocketplane, and this attracts the attention of individuals and organizations that are planning for the establishment of a commercial spaceport. This is the approach chosen by the planners and developers of Spaceport Malaysia. A significant factor in zero gravity flight is the zero gravity time, the period where the payload onboard the airplane or rocketplane will experience zero gravity. Based on the momentum of the airplane or rocketplane, the zero gravity time may vary from few seconds to few minutes and that determines the quality of the zero gravity flight. To achieve zero gravity, the airplane or rocketplane will fly with a steady velocity for a significant time as a gravity control flight, accelerate upwards with an angle producing hypergravity and perform parabolic flight with natural momentum producing zero gravity and followed by dive that will result in another hypergravity flight. 2 zero gravity platforms being considered for operation at and by Spaceport Malaysia are F-5E Tiger II and Airbus A300, since both platforms have been successfully used by a partner of Spaceport Malaysia in performing zero gravity flights. An F-5E fighter jet owned by Royal Malaysian Air Force is being planned to be converted into a zero gravity platform to be operated at and by Spaceport

  15. 7 CFR 1465.6 - AMA plan of operations.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false AMA plan of operations. 1465.6 Section 1465.6... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS AGRICULTURAL MANAGEMENT ASSISTANCE General Provisions § 1465.6 AMA plan of operations. (a) All conservation practices in the APO must be approved by...

  16. Operations planning for Space Station Freedom - And beyond

    Science.gov (United States)

    Gibson, Stephen S.; Martin, Thomas E.; Durham, H. J.

    1992-01-01

    The potential of automated planning and electronic execution systems for enhancing operations on board Space Station Freedom (SSF) are discussed. To exploit this potential the Operations Planning and Scheduling Subsystem is being developed at the NASA Johnson Space Center. Such systems may also make valuable contributions to the operation of resource-constrained, long-duration space habitats of the future. Points that should be considered during the design of future long-duration manned space missions are discussed. Early development of a detailed operations concept as an end-to-end mission description offers a basis for iterative design evaluation, refinement, and option comparison, particularly when used with an advanced operations planning system capable of modeling the operations and resource constraints of the proposed designs.

  17. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  18. STS-49 Endeavour, Orbiter Vehicle (OV) 105, Planning Team in MCC Bldg 30 FCR

    Science.gov (United States)

    1992-01-01

    STS-49 Endeavour, Orbiter Vehicle (OV) 105, Planning Team with Flight Director (FD) James M. Heflin, Jr (front right next to ship model) poses in JSC's Mission Control Center (MCC) Bldg 30 Flight Control Room (FCR). The group stands in front of visual displays projecting STS-49 data and ground track map.

  19. Planning in the Continuous Operations Environment of the International Space Station

    Science.gov (United States)

    Maxwell, Theresa; Hagopian, Jeff

    1996-01-01

    The continuous operation planning approach developed for the operations planning of the International Space Station (ISS) is reported on. The approach was designed to be a robust and cost-effective method. It separates ISS planning into two planning functions: long-range planning for a fixed length planning horizon which continually moves forward as ISS operations progress, and short-range planning which takes a small segment of the long-range plan and develops a detailed operations schedule. The continuous approach is compared with the incremental approach, the short and long-range planning functions are described, and the benefits and challenges of implementing a continuous operations planning approach for the ISS are summarized.

  20. Spent Nuclear Fuel (SNF) Startup Plan to Operations

    International Nuclear Information System (INIS)

    GREGORY, J.R.

    2000-01-01

    This plan defines the approach that will be used to ensure the transition from initial startup to normal operations of the SNF operations--are performed in a safe, controlled, and deliberate manner. It provides a phased approach that bridges the operations between the completion of the ORR and the return to normal operations. This plan includes management oversight and administrative controls to be implemented and then reduced in a controlled manner until normal operations are authorized by SNF Management

  1. Mission Operations of the Mars Exploration Rovers

    Science.gov (United States)

    Bass, Deborah; Lauback, Sharon; Mishkin, Andrew; Limonadi, Daniel

    2007-01-01

    A document describes a system of processes involved in planning, commanding, and monitoring operations of the rovers Spirit and Opportunity of the Mars Exploration Rover mission. The system is designed to minimize command turnaround time, given that inherent uncertainties in terrain conditions and in successful completion of planned landed spacecraft motions preclude planning of some spacecraft activities until the results of prior activities are known by the ground-based operations team. The processes are partitioned into those (designated as tactical) that must be tied to the Martian clock and those (designated strategic) that can, without loss, be completed in a more leisurely fashion. The tactical processes include assessment of downlinked data, refinement and validation of activity plans, sequencing of commands, and integration and validation of sequences. Strategic processes include communications planning and generation of long-term activity plans. The primary benefit of this partition is to enable the tactical portion of the team to focus solely on tasks that contribute directly to meeting the deadlines for commanding the rover s each sol (1 sol = 1 Martian day) - achieving a turnaround time of 18 hours or less, while facilitating strategic team interactions with other organizations that do not work on a Mars time schedule.

  2. Emergency planning and operating experience

    International Nuclear Information System (INIS)

    Halpern, O.; Breniere, J.

    1984-01-01

    The purpose of this paper is to derive lessons from operating experience for the planning of emergency measures. This operating experience has two facets: it is obtained not only from the various incidents and accidents which have occurred in countries with nuclear power programmes and from the resulting application of emergency plans but also from the different exercises and simulations carried out in France and in other countries. Experience generally confirms the main approaches selected for emergency plans. The lessons to be derived are of three types: first, it appears necessary to set forth precisely the responsibilities of each person involved in order to prevent a watering-down of decisions in the event of an accident; secondly, considerable improvements need to be made in the different communication networks to be used; and thirdly, small accidents with minor radiological consequences deserve as systematic and thorough an approach as large and more improbable accidents. (author)

  3. Study on team evaluation. Team process model for team evaluation

    International Nuclear Information System (INIS)

    Sasou Kunihide; Ebisu, Mitsuhiro; Hirose, Ayako

    2004-01-01

    Several studies have been done to evaluate or improve team performance in nuclear and aviation industries. Crew resource management is the typical example. In addition, team evaluation recently gathers interests in other teams of lawyers, medical staff, accountants, psychiatrics, executive, etc. However, the most evaluation methods focus on the results of team behavior that can be observed through training or actual business situations. What is expected team is not only resolving problems but also training younger members being destined to lead the next generation. Therefore, the authors set the final goal of this study establishing a series of methods to evaluate and improve teams inclusively such as decision making, motivation, staffing, etc. As the first step, this study develops team process model describing viewpoints for the evaluation. The team process is defined as some kinds of power that activate or inactivate competency of individuals that is the components of team's competency. To find the team process, the authors discussed the merits of team behavior with the experienced training instructors and shift supervisors of nuclear/thermal power plants. The discussion finds four team merits and many components to realize those team merits. Classifying those components into eight groups of team processes such as 'Orientation', 'Decision Making', 'Power and Responsibility', 'Workload Management', 'Professional Trust', 'Motivation', 'Training' and 'staffing', the authors propose Team Process Model with two to four sub processes in each team process. In the future, the authors will develop methods to evaluate some of the team processes for nuclear/thermal power plant operation teams. (author)

  4. Program Development Plan and Team up

    Energy Technology Data Exchange (ETDEWEB)

    Solar Electric Power Association

    2001-12-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

  5. Overview of planning process at FFTF [Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Gadeken, A.D.

    1986-03-01

    The planning process at the Fast Flux Test Facility (FFTF) is controlled through a hierarchy of documents ranging from a ten-year strategic plan to a weekly schedule. Within the hierarchy are a Near-Term (three-year) Operating Plan, a Cycle (six-month) Plan, and an Outage/Operating Phase Schedule. Coordination of the planning process is accomplished by a dedicated preparation team that also provides an overview of the formal planning timetable which identifies key action items required to be completed before an outage/operating phase can begin

  6. The Regional Environmental Emergency Team (REET)

    International Nuclear Information System (INIS)

    Maddock, M.

    2001-01-01

    This paper outlined the approach taken in Ontario to set up the Regional Environmental Emergency Team (REET) teams and the progress made in developing partnerships and coordination in response to environmental emergencies in Ontario. Environment Canada has been involved with the Ontario Regional Environmental Emergency Team (REET) Program for the past decade in order to review emergency response roles and responsibilities. REET is designed to enhance communication between emergency response agencies, foster recognition of the various responsibilities involved in an environmental emergency response and to increase the basic understanding of emergency response techniques and procedures within the emergency response community. During emergency response situations REET operates as a flexible and expandable multi-disciplinary and multi-agency team that provides comprehensive and coordinated environmental advice, information and assistance. The Ontario REET program currently consists of 18 area teams throughout the province with informal partnerships with Environment Canada, the Canadian Coast Guard, the Ontario Ministry of the Environment, Emergency Measures Ontario and the Ontario Ministry of Natural Resources. The program was inspired in 1970 and continues to provide an appropriate forum for environmental emergency planning and response. 6 refs., 1 fig

  7. Effects of time pressure and communication environment on team processes and outcomes in dyadic planning

    NARCIS (Netherlands)

    Kleij, R van der; Lijkwan, J.T.E..; Dreu, C.K.W. de

    2009-01-01

    An experiment compared dyadic performance in a radio communication and a more sophisticated communication environment to face-to-face (FtF) meetings. Thirty-six dyads, working under low or high time-pressure conditions, needed to combine information and to produce a written plan. Teams working in

  8. Ergonomic evaluation model of operational room based on team performance

    Directory of Open Access Journals (Sweden)

    YANG Zhiyi

    2017-05-01

    Full Text Available A theoretical calculation model based on the ergonomic evaluation of team performance was proposed in order to carry out the ergonomic evaluation of the layout design schemes of the action station in a multitasking operational room. This model was constructed in order to calculate and compare the theoretical value of team performance in multiple layout schemes by considering such substantial influential factors as frequency of communication, distance, angle, importance, human cognitive characteristics and so on. An experiment was finally conducted to verify the proposed model under the criteria of completion time and accuracy rating. As illustrated by the experiment results,the proposed approach is conductive to the prediction and ergonomic evaluation of the layout design schemes of the action station during early design stages,and provides a new theoretical method for the ergonomic evaluation,selection and optimization design of layout design schemes.

  9. OntoEmergePlan: variability of emergency plans supported by a domain ontology

    NARCIS (Netherlands)

    Ferreira, Maria I.G.B; Moreira, João; Campos, Maria Luiza M.; Braga, Bernardo F.B; Sales, Tiago P.; de Cordeiro, Kelli F.; Borges, Marcos R.S.

    2015-01-01

    The preparation of high quality emergency plans to guide operational decisions is an approach to mitigate the emergency management complexity. In such multidisciplinary scenario, teams with different perspectives need to collaborate towards a common goal and interact within a common understanding.

  10. Operations and maintenance plans for the TFTR

    International Nuclear Information System (INIS)

    Allen, H.L.; Fedor, B.J.

    1978-01-01

    Princeton University Plasma Physics Laboratory (PPPL) is constructing a Tokamak Fusion Test Reactor (TFTR) scheduled to begin operation for fusion research experiments in late 1981, first with hydrogen and deuterium plasmas and later, in the second phase, using tritium for high power fusion studies. This latter mode will introduce considerable complexity to operation and maintenance of the TFTR in terms of meeting requirements for tritium handling, adequate radiation shielding, and corrective and preventive maintenance procedures. In this paper we discuss plans for the installation and preoperational testing of the major subsystems of TFTR, proposed start-up and operating scenarios for the device and the system of operational control. In addition, the TFTR Maintenance Plan and related procedures for specific major maintenance tasks are described, including the use of remote handling equipment and remote manipulators. Each of these topics is addressed in terms of the current status of planning and development

  11. Internal operating plan (P.O.I.)

    International Nuclear Information System (INIS)

    2002-01-01

    This article presents the POI (internal operating plan) which defines the management measures, the intervention methods and the required means that the operator must implement to protect the personnel, the population and the environment. (A.L.B.)

  12. Dealing with Uncertainty in Operational Transport Planning

    NARCIS (Netherlands)

    Zutt, J.; Van Gemund, A.J.C.; De Weerdt, M.M.; Witteveen, C.

    2010-01-01

    An important problem in transportation is how to ensure efficient operational route planning when several vehicles share a common road infrastructure with limited capacity. Examples of such a problem are route planning for automated guided vehicles in a terminal and route planning for aircraft

  13. Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

    Science.gov (United States)

    Marquez, Jessica J.; Pyrzak, Guy; Hashemi, Sam; Ahmed, Samia; McMillin, Kevin Edward; Medwid, Joseph Daniel; Chen, Diana; Hurtle, Esten

    2013-01-01

    Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

  14. Report on the emergency evacuation review team on emergency response plans for the Perry and Davis-Besse nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    This book is a report by Ohio's Emergency Evacuation Review Team, at the request of Governor Richard Celeste. The Team concludes that the current emergency response plan for Ohio's reactors is inadequate to protect the public and recommends changes in the current emergency plant requirements. The report also includes a summary of the litigation that has occurred since Celeste withdrew his support for the plans, a list of experts consulted, and sources used to prepare the report. An important document, and a study which every state should undertake

  15. Operational concepts for the Environmental Restoration and Waste Management Configuration Study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-12-01

    DOE has initiated a planning process in anticipation of upgrading all DOE waste management operations and facilities. The EM Configuration Study examines four areas: (1) planning considerations, (2) system configuration, (3) operational concepts, and (4) resource assessments. Each area is addressed by a different team. Objective of the Operational Concepts Team 3 study is to investigate, identify, define, and evaluate alternative ways to manage DOE waste management facilities, while taking into consideration the information gathered by the other EM Configuration teams. This report provides information and criteria for evaluating the relative effectiveness and efficiency of various organizational alternatives that can be used to operate and manage DOE waste facilities. Intent of this report is not to select one best management alternative but rather to provide recommendations, conclusions, and background information from which decisions will be made at a future date.

  16. The Science Operations Concept for the ExoMars 2016 Trace Gas Orbiter

    Science.gov (United States)

    Frew, D.

    2014-04-01

    The ExoMars 2016 Science Operations Centre (SOC) based at the European Space Astronomy Centre is responsible for coordinating the science planning activities for the Trace Gas Orbiter. Science planning will involve all members of the ExoMars 2016 science ground segment (SGS), namely the SOC at ESAC, the Russian SOC at IKI, the orbiter instrument teams and the science management of the 2016 mission represented by the science working team (SWT) that is chaired by the project scientist. The science operations concept for the mission builds on the legacy inherited from previous ESA planetary missions, in particular from Mars Express for the core plan validation aspects and from the Smart-1 lunar mission for the opportunity analysis and longterm planning approach. Further concept drivers have been derived from the ExoMars 2016 mission profile in the areas of orbit predictability, instrument design and the usage of TGO as a relay for surface assets including the ExoMars 2018 rover. This paper will give an over view of the entire uplink planning process as it is conducted over 3 distinct planning cycles. The Long Term Plan (LTP) establishes the baseline science plan and demonstrates the operational feasibility of meeting the mission science goals formulated by the science working team (SWT) at science management level. The LTP has a planning horizon of 6 months. Each month of the baseline science plan is refined with the instrument teams within the Medium Term Plan (MTP) to converge on a frozen attitude request and resource envelopes for all of the observations in the plan. During the Short Term Planning cycle the SOC will iterate with the teams to finalise the commanding for all of the observations in the plan for the coming week. The description of the uplink planning process will focus on two key areas that are common to all of the planning cycles mentioned above: • Science Plan Abstraction: Interacting with the science plan at the appropriate level of abstraction to

  17. 40 CFR 300.110 - National Response Team.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false National Response Team. 300.110... PLAN Responsibility and Organization for Response § 300.110 National Response Team. National planning... agencies named in § 300.175(b). Each agency shall designate a member to the team and sufficient alternates...

  18. Planning intensive care unit design using computer simulation modeling: optimizing integration of clinical, operational, and architectural requirements.

    Science.gov (United States)

    OʼHara, Susan

    2014-01-01

    Nurses have increasingly been regarded as critical members of the planning team as architects recognize their knowledge and value. But the nurses' role as knowledge experts can be expanded to leading efforts to integrate the clinical, operational, and architectural expertise through simulation modeling. Simulation modeling allows for the optimal merge of multifactorial data to understand the current state of the intensive care unit and predict future states. Nurses can champion the simulation modeling process and reap the benefits of a cost-effective way to test new designs, processes, staffing models, and future programming trends prior to implementation. Simulation modeling is an evidence-based planning approach, a standard, for integrating the sciences with real client data, to offer solutions for improving patient care.

  19. Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment

    Science.gov (United States)

    2003-09-22

    This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...

  20. Important Non-Technical Skills in Video-Assisted Thoracoscopic Surgery Lobectomy: Team Perspectives.

    Science.gov (United States)

    Gjeraa, Kirsten; Mundt, Anna S; Spanager, Lene; Hansen, Henrik J; Konge, Lars; Petersen, René H; Østergaard, Doris

    2017-07-01

    Safety in the operating room is dependent on the team's non-technical skills. The importance of non-technical skills appears to be different for minimally invasive surgery as compared with open surgery. The aim of this study was to identify which non-technical skills are perceived by team members to be most important for patient safety, in the setting of video-assisted thoracoscopic surgery (VATS) lobectomy. This was an explorative, semistructured interview-based study with 21 participants from all four thoracic surgery centers in Denmark that perform VATS lobectomy. Data analysis was deductive, and directed content analysis was used to code the text into the Oxford Non-Technical Skills system for evaluating operating teams' non-technical skills. The most important non-technical skills described by the VATS teams were planning and preparation, situation awareness, problem solving, leadership, risk assessment, and teamwork. These non-technical skills enabled the team to achieve shared mental models, which in turn facilitated their efforts to anticipate next steps. This was viewed as important by the participants as they saw VATS lobectomy as a high-risk procedure with complementary and overlapping scopes of practice between surgical and anesthesia subteams. This study identified six non-technical skills that serve as the foundation for shared mental models of the patient, the current situation, and team resources. These findings contribute three important additions to the shared mental model construct: planning and preparation, risk assessment, and leadership. Shared mental models are crucial for patient safety because they enable VATS teams to anticipate problems through adaptive patterns of both implicit and explicit coordination. Copyright © 2017 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  1. Team behaviors in emergency care: a qualitative study using behavior analysis of what makes team work.

    Science.gov (United States)

    Mazzocato, Pamela; Forsberg, Helena Hvitfeldt; Schwarz, Ulrica von Thiele

    2011-11-15

    Teamwork has been suggested as a promising approach to improving care processes in emergency departments (ED). However, for teamwork to yield expected results, implementation must involve behavior changes. The aim of this study is to use behavior analysis to qualitatively examine how teamwork plays out in practice and to understand eventual discrepancies between planned and actual behaviors. The study was set in a Swedish university hospital ED during the initial phase of implementation of teamwork. The intervention focused on changing the environment and redesigning the work process to enable teamwork. Each team was responsible for entire care episodes, i.e. from patient arrival to discharge from the ED. Data was collected through 3 days of observations structured around an observation scheme. Behavior analysis was used to pinpoint key teamwork behaviors for consistent implementation of teamwork and to analyze the contingencies that decreased or increased the likelihood of these behaviors. We found a great discrepancy between the planned and the observed teamwork processes. 60% of the 44 team patients observed were handled solely by the appointed team members. Only 36% of the observed patient care processes started according to the description in the planned teamwork process, that is, with taking patient history together. Beside this behavior, meeting in a defined team room and communicating with team members were shown to be essential for the consistent implementation of teamwork. Factors that decreased the likelihood of these key behaviors included waiting for other team members or having trouble locating each other. Getting work done without delay and having an overview of the patient care process increased team behaviors. Moreover, explicit instructions on when team members should interact and communicate increased adherence to the planned process. This study illustrates how behavior analysis can be used to understand discrepancies between planned and observed

  2. ISS Payload Operations: The Need for and Benefit of Responsive Planning

    Science.gov (United States)

    Nahay, Ed; Boster, Mandee

    2000-01-01

    International Space Station (ISS) payload operations are controlled through implementation of a payload operations plan. This plan, which represents the defined approach to payload operations in general, can vary in terms of level of definition. The detailed plan provides the specific sequence and timing of each component of a payload's operations. Such an approach to planning was implemented in the Spacelab program. The responsive plan provides a flexible approach to payload operations through generalization. A responsive approach to planning was implemented in the NASA/Mir Phase 1 program, and was identified as a need during the Skylab program. The current approach to ISS payload operations planning and control tends toward detailed planning, rather than responsive planning. The use of detailed plans provides for the efficient use of limited resources onboard the ISS. It restricts flexibility in payload operations, which is inconsistent with the dynamic nature of the ISS science program, and it restricts crew desires for flexibility and autonomy. Also, detailed planning is manpower intensive. The development and implementation of a responsive plan provides for a more dynamic, more accommodating, and less manpower intensive approach to planning. The science program becomes more dynamic and responsive as the plan provides flexibility to accommodate real-time science accomplishments. Communications limitations and the crew desire for flexibility and autonomy in plan implementation are readily accommodated with responsive planning. Manpower efficiencies are accomplished through a reduction in requirements collection and coordination, plan development, and maintenance. Through examples and assessments, this paper identifies the need to transition from detailed to responsive plans for ISS payload operations. Examples depict specific characteristics of the plans. Assessments identify the following: the means by which responsive plans accommodate the dynamic nature of

  3. Building multidisciplinary business teams

    International Nuclear Information System (INIS)

    Dyson, C.J.; Winte, N.C.

    1991-01-01

    This paper is a description of an approach to managing Exploration and Production assets through the operation of multidisciplinary business teams. The business team approach can assist in improved asset performance in terms of efficiency, motivation and business results, compared with more traditional matrix style hierarchies. Within this paper certain critical success factors for the long term success of multidiscipline teams are outlined, together with some of the risk of business team operation

  4. Rendezvous, proximity operations and capture quality function deployment report

    Science.gov (United States)

    Lamkin, Stephen L. (Editor)

    1991-01-01

    Rendezvous, Proximity Operations, and Capture (RPOC) is a missions operations area which is extremely important to present and future space initiatives and must be well planned and coordinated. To support this, a study team was formed to identify a specific plan of action using the Quality Function Deployment (QFD) process. This team was composed of members from a wide spectrum of engineering and operations organizations which are involved in the RPOC technology area. The key to this study's success is an understanding of the needs of potential programmatic customers and the technology base available for system implementation. To this end, the study team conducted interviews with a variety of near term and future programmatic customers and technology development sponsors. The QFD activity led to a thorough understanding of the needs of these customers in the RPOC area, as well as the relative importance of these needs.

  5. Rendezvous, proximity operations and capture quality function deployment report

    Science.gov (United States)

    Lamkin, Stephen L.

    1991-12-01

    Rendezvous, Proximity Operations, and Capture (RPOC) is a missions operations area which is extremely important to present and future space initiatives and must be well planned and coordinated. To support this, a study team was formed to identify a specific plan of action using the Quality Function Deployment (QFD) process. This team was composed of members from a wide spectrum of engineering and operations organizations which are involved in the RPOC technology area. The key to this study's success is an understanding of the needs of potential programmatic customers and the technology base available for system implementation. To this end, the study team conducted interviews with a variety of near term and future programmatic customers and technology development sponsors. The QFD activity led to a thorough understanding of the needs of these customers in the RPOC area, as well as the relative importance of these needs.

  6. The Preparation for and Execution of Engineering Operations for the Mars Curiosity Rover Mission

    Science.gov (United States)

    Samuels, Jessica A.

    2013-01-01

    The Mars Science Laboratory Curiosity Rover mission is the most complex and scientifically packed rover that has ever been operated on the surface of Mars. The preparation leading up to the surface mission involved various tests, contingency planning and integration of plans between various teams and scientists for determining how operation of the spacecraft (s/c) would be facilitated. In addition, a focused set of initial set of health checks needed to be defined and created in order to ensure successful operation of rover subsystems before embarking on a two year science journey. This paper will define the role and responsibilities of the Engineering Operations team, the process involved in preparing the team for rover surface operations, the predefined engineering activities performed during the early portion of the mission, and the evaluation process used for initial and day to day spacecraft operational assessment.

  7. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  8. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  9. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  10. The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

    Science.gov (United States)

    Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray

    2012-01-01

    In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

  11. The productivity effects of profit sharing, employee ownership, stock option and team incentive plans: Evidence from korean panel data

    OpenAIRE

    Kato, Takao; Lee, Ju Ho; Ryu, Jang-soo

    2010-01-01

    We report the first results for Korean firms on the incidence, diffusion, scope and effects of diverse employee financial participation schemes, such as Profit Sharing Plans (PSPs), Employee Stock Ownership Plans (ESOPs), Stock Option Plans (SOPs) and Team Incentive Plans (TIPs). In do doing, we assemble important new panel data by merging data from a survey of all Korean firms listed on Korean Stock Exchange which enjoys an unusually high response rate of 60 percent with accounting data from...

  12. 36 CFR 223.32 - Timber sale operating plan.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Timber sale operating plan... SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER Timber Sale Contracts Contract Conditions and Provisions § 223.32 Timber sale operating plan. Sale contracts with a term of 2 years or more shall provide...

  13. Mental Workload and Performance Experiment (MWPE) Team in the Spacelab Payload Operations Control

    Science.gov (United States)

    1992-01-01

    The primary payload for Space Shuttle Mission STS-42, launched January 22, 1992, was the International Microgravity Laboratory-1 (IML-1), a pressurized manned Spacelab module. The goal of IML-1 was to explore in depth the complex effects of weightlessness of living organisms and materials processing. Around-the-clock research was performed on the human nervous system's adaptation to low gravity and effects of microgravity on other life forms such as shrimp eggs, lentil seedlings, fruit fly eggs, and bacteria. Materials processing experiments were also conducted, including crystal growth from a variety of substances such as enzymes, mercury iodide, and a virus. The Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at the Marshall Space Flight Center (MSFC) was the air/ground communication channel used between the astronauts and ground control teams during the Spacelab missions. Featured is the Mental Workload and Performance Experiment (MWPE) team in the SL POCC) during STS-42, IML-1 mission.

  14. Operational planning of refineries; Planejamento operacional de refinarias

    Energy Technology Data Exchange (ETDEWEB)

    Sinay, Maria Cristina Fogliatti de [Instituto Militar de Engenharia (IME), Rio de Janeiro, RJ (Brazil); Bueno, Catia [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    The activities integration that compose the petroleum logistic chain makes more complex its planning which is normally done in a joined level, using operation research models in order to find optimized solutions. When this integrated planning is repassed to the companies and its constitutes parts (mainly refinery) uncertainness are generated about the solution that will be adopted in case of new restrictions appear. Then, the purpose of this work is propose a procedure that is capable to adequate and specifies optimized solutions presented by corporative model to refinery operations, using 'What-if' and deterministic simulation technique with optimization. To achieve this objective will be analysed typical activities in refineries and basic principles to their operational planning. (author)

  15. National Response Team

    Science.gov (United States)

    Response planning and coordination (not direct response itself) is accomplished at the federal level through the U.S. National Response Team (NRT), an interagency group co-chaired by EPA and U.S. Coast Guard. NRT distributes information, plans, and trains.

  16. New York State Middle Schools and Instructional Scheduling, Teaming and Common Planning: A Descriptive Study

    Science.gov (United States)

    Corey, Chad; Babo, Gerard

    2016-01-01

    Data regarding the type of instructional scheduling utilized along with the use of teaming and common planning at the middle school level has not been collected nor reported on the New York State School Report Card, and therefore it is not known whether and how middle schools are implementing these three school supports. Consequently, the purpose…

  17. New heuristics for planning operating rooms.

    NARCIS (Netherlands)

    Molina-Pariente, J.M.; Hans, Elias W.; Framinan, J.M.; Gomez-Cia, T.

    2015-01-01

    We tackle the operating room planning problem of the Plastic Surgery and Major Burns Specialty of the University Hospital “Virgen del Rocio” in Seville (Spain). The decision problem is to assign an intervention date and an operating room to a set of surgeries on the waiting list, minimizing access

  18. Teams and teamwork at NASA Langley Research Center

    Science.gov (United States)

    Dickinson, Terry L.

    1994-01-01

    The recent reorganization and shift to managing total quality at the NASA Langley Research Center (LaRC) has placed an increasing emphasis on teams and teamwork in accomplishing day-to-day work activities and long-term projects. The purpose of this research was to review the nature of teams and teamwork at LaRC. Models of team performance and teamwork guided the gathering of information. Current and former team members served as participants; their collective experience reflected membership in over 200 teams at LaRC. The participants responded to a survey of open-ended questions which assessed various aspects of teams and teamwork. The participants also met in a workshop to clarify and elaborate on their responses. The work accomplished by the teams ranged from high-level managerial decision making (e.g., developing plans for LaRC reorganization) to creating scientific proposals (e.g., describing spaceflight projects to be designed, sold, and built). Teams typically had nine members who remained together for six months. Member turnover was around 20 percent; this turnover was attributed to heavy loads of other work assignments and little formal recognition and reward for team membership. Team members usually shared a common and valued goal, but there was not a clear standard (except delivery of a document) for knowing when the goal was achieved. However, members viewed their teams as successful. A major factor in team success was the setting of explicit a priori rules for communication. Task interdependencies between members were not complex (e.g., sharing of meeting notes and ideas about issues), except between members of scientific teams (i.e., reliance on the expertise of others). Thus, coordination of activities usually involved scheduling and attendance of team meetings. The team leader was designated by the team's sponsor. This leader usually shared power and responsibilities with other members, such that team members established their own operating

  19. 77 FR 14047 - Guidance for Decommissioning Planning During Operations

    Science.gov (United States)

    2012-03-08

    ...)-4014, ``Decommissioning Planning During Operations.'' This action is necessary to correct the NRC's... NUCLEAR REGULATORY COMMISSION [NRC-2011-0286] Guidance for Decommissioning Planning During Operations AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; correction. SUMMARY: The U...

  20. Transition to Operations Plans for GPM Datasets

    Science.gov (United States)

    Zavodsky, Bradley; Jedlovec, Gary; Case, Jonathan; Leroy, Anita; Molthan, Andrew; Bell, Jordan; Fuell, Kevin; Stano, Geoffrey

    2013-01-01

    Founded in 2002 at the National Space Science Technology Center at Marshall Space Flight Center in Huntsville, AL. Focused on transitioning unique NASA and NOAA observations and research capabilities to the operational weather community to improve short-term weather forecasts on a regional and local scale. NASA directed funding; NOAA funding from Proving Grounds (PG). Demonstrate capabilities experimental products to weather applications and societal benefit to prepare forecasters for the use of data from next generation of operational satellites. Objective of this poster is to highlight SPoRT's research to operations (R2O) paradigm and provide examples of work done by the team with legacy instruments relevant to GPM in order to promote collaborations with groups developing GPM products.

  1. Operating Theatre Planning and Scheduling.

    NARCIS (Netherlands)

    Hans, Elias W.; Vanberkel, P.T.; Hall, R.

    2012-01-01

    In this chapter we present a number of approaches to operating theatre planning and scheduling. We organize these approaches hierarchically which serves to illustrate the breadth of problems confronted by researchers. At each hierarchicalplanning level we describe common problems, solution

  2. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume I. Organization plan

    International Nuclear Information System (INIS)

    1981-12-01

    This plan and the accompanying MFTF-B Integrated Operations Plan are submitted in response to UC/LLNL Purchase Order 3883801, dated July 1981. The organization plan also addresses the specific tasks and trade studies directed by the scope of work. The Integrated Operations Plan, which includes a reliability, quality assurance, and safety plan and an integrated logistics plan, comprises the burden of the report. In the first section of this volume, certain underlying assumptions and observations are discussed setting the requirements and limits for organization. Section B presents the recommended structure itself. Section C Device Availability vs Maintenance and Support Efforts and Section D Staffing Levels and Skills provide backup detail and justification. Section E is a trade study on maintenance and support by LLNL staff vs subcontract and Section F is a plan for transitioning from the construction phase into operation. A brief summary of schedules and estimated costs concludes the volume

  3. LANL continuity of operations plan

    Energy Technology Data Exchange (ETDEWEB)

    Senutovitch, Diane M [Los Alamos National Laboratory

    2010-12-22

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may

  4. Team skills training

    International Nuclear Information System (INIS)

    Coe, R.P.; Carl, D.R.

    1991-01-01

    Numerous reports and articles have been written recently on the importance of team skills training for nuclear reactor operators, but little has appeared on the practical application of this theoretical guidance. This paper describes the activities of the Training and Education Department at GPU Nuclear (GPUN). In 1987, GPUN undertook a significant initiative in its licensed operator training programs to design and develop initial and requalification team skills training. Prior to that time, human interaction skills training (communication, stress management, supervisory skills, etc.) focused more on the individual rather than a group. Today, GPU Nuclear conducts team training at both its Three Mile Island (YMI), PA and Oyster Creek (OC), NJ generating stations. Videotaped feedback is sued extensively to critique and reinforce targeted behaviors. In fact, the TMI simulator trainer has a built-in, four camera system specifically designed for team training. Evaluations conducted on this training indicated these newly acquired skills are being carried over to the work environment. Team training is now an important and on-going part of GPUN operator training

  5. Rolling schedule approaches for supply chain operations planning

    NARCIS (Netherlands)

    Spitter, J.M.

    2005-01-01

    Supply Chain Operations Planning (SCOP) involves the determination of an extensive production plan for a network of manufacturing and distribution entities within and across organizations. The production plan consist of order release decisions that allocate materials and resources in order to

  6. Spacelab operations planning. [ground handling, launch, flight and experiments

    Science.gov (United States)

    Lee, T. J.

    1976-01-01

    The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.

  7. Disruption management - operations research between planning and execution

    DEFF Research Database (Denmark)

    Clausen, Jens; Larsen, Jesper; Larsen, Allan

    2001-01-01

    For a large number of applications Operations Research has a proven track record: it can deliver high quality solutions for planning problems. Important examples can be found in the airline industry, logistics and production management. This report will describe real-world examples of a novel way...... of applying Operations Research: As plans have to be adjusted to take last minute changes into consideration, OR can play an active role in such a situation by producing, maybe even in a pro-actively role, alternative plans. This type of activity is called Disruption Management....

  8. On-call emergency workload of a general surgical team.

    Science.gov (United States)

    Jawaid, Masood; Raza, Syed Muhammad; Alam, Shams Nadeem; Manzar, S

    2009-01-01

    To examine the on-call emergency workload of a general surgical team at a tertiary care teaching hospital to guide planning and provision of better surgical services. During six months period from August to January 2007; all emergency calls attended by general surgical team of Surgical Unit II in Accident and Emergency department (A and E) and in other units of Civil, Hospital Karachi, Pakistan were prospectively recorded. Data recorded includes timing of call, diagnosis, operation performed and outcome apart from demography. Total 456 patients (326 males and 130 females) were attended by on-call general surgery team during 30 emergency days. Most of the calls, 191 (41.9%) were received from 8 am to 5 pm. 224 (49.1%) calls were of abdominal pain, with acute appendicitis being the most common specific pathology in 41 (9.0%) patients. Total 73 (16.0%) calls were received for trauma. Total 131 (28.7%) patients were admitted in the surgical unit for urgent operation or observation while 212 (46.5%) patients were discharged from A and E. 92 (20.1%) patients were referred to other units with medical referral accounts for 45 (9.8%) patients. Total 104 (22.8%) emergency surgeries were done and the most common procedure performed was appendicectomy in 34 (32.7%) patients. Major workload of on-call surgical emergency team is dealing with the acute conditions of abdomen. However, significant proportion of patients are suffering from other conditions including trauma that require a holistic approach to care and a wide range of skills and experience. These results have important implications in future healthcare planning and for the better training of general surgical residents.

  9. Approach to operational mine planning: Case study Tamnava West

    Directory of Open Access Journals (Sweden)

    Stevanović Dejan R.

    2014-01-01

    Full Text Available In contemporary mining industry is very difficult to achieve production targets and profit without investing effort in detailed excavation planning. It is especially true for deposits with complex geological structure and production technology, as is the case for many coal mines in Serbia. The majority of coal production is used for generation of electricity in power plant. This fact is the main reason why production objectives of coal mine and power plant are strongly connected. Due to the fluctuation of the coal quality, operational mine planning (as a part of coal homogenization process, is of critical importance for managing successful coal quality control and meeting criteria of power plant. This paper investigates advantage of proper operational planning on coal quality control process and overall production performance. For better understanding case study is conducted on open pit Tamnava West field. Successful operational mine planning is almost impossible without use of modern software packages. For that reason in presented case study operational mine planning is done with Minex software.

  10. Site scientific mission plan for the Southern Great Plains CART site: July--December 1997

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1997-07-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on July 1, 1997, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  11. ICD Complex Operations and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  12. Study of operating procedures in nuclear power plants: Practices and problems

    International Nuclear Information System (INIS)

    Morgenstern, M.H.; Barnes, V.E.; McGuire, M.V.; Radford, L.R.; Wheeler, W.A.

    1987-02-01

    This report describes the project activities, findings, and recommendations of a project entitled ''Program Plan for Assessing and Upgrading Operating Procedures for Nuclear Power Plants.'' The project was performed by the Pacific Northwest Laboratory and Battelle Human Affairs Research Centers for the Division of Human Factors Technology, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission (NRC). The project team analyzed and evaluated samples of normal and abnormal operating procedures from 31 commercial nuclear power plant sites operating in the United States. The project team also visited nine nuclear power plants in the United States to obtain information on the development, use, and control of operating procedures. A peer review group was convened to advise the project team on the conduct of the project and to review and comment on the project report. The report contains findings on the usability of operating procedures and on practices concerning the development, use, an control of operating procedures in nuclear power plants. The report includes recommendations to the NRC on the need to upgrade the quality of operating procedures. The report also discusses an approach to a program plan to assess and upgrade operating procedures

  13. Program Development Plan and Team up; FINAL

    International Nuclear Information System (INIS)

    Solar Electric Power Association

    2001-01-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead

  14. Operations Program Plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1990-09-01

    This document, Revision 4 of the Operations Program Plan, has been developed as the seven-year master plan for operating of the Waste Isolation Pilot Plant (WIPP). Subjects covered include public and technical communications; regulatory and environmental programs; startup engineering; radiation handling, surface operations, and underground operations; waste certification and waste handling; transportation development; geotechnical engineering; experimental operations; engineering program; general maintenance; security program; safety, radiation, and regulatory assurance; quality assurance program; training program; administration activities; management systems program; and decommissioning. 243 refs., 19 figs., 25 tabs. (SM)

  15. Three images of interdisciplinary team meetings.

    Science.gov (United States)

    Crepeau, E B

    1994-08-01

    Teams are an essential aspect of health care today, especially in rehabilitation or chronic illness where the course of care is frequently long, complex, and unpredictable. The coordinative function of teams and their interdisciplinary aspects are thought to improve patient care because team members bring their unique professional skills together to address patient problems. This coordination is enacted through the team meeting, which typically results in an integrated care plan. This professional image of team meetings is explicit and addresses the description and provision of care as objective and rational activities. In contrast, the constructed and ritualistic images of health care team meetings are implicit and concern the less objective and rational aspects of planning care. The constructed image pertains to the definitional activity of team members as they try to understand patient troubles and achieve consensus. This process involves the individual clinical reasoning of team members and the collective reasoning of the group. The ritualistic image is that aspect of team meetings in which the team affirms and reaffirms its collective identity. Drawing from field research of geropsychiatric team meetings, this article defines and explicates these images, focusing on the constructed and ritualistic aspects of team meetings and the influence of these images on group function.

  16. Study on dynamic team performance evaluation methodology based on team situation awareness model

    International Nuclear Information System (INIS)

    Kim, Suk Chul

    2005-02-01

    The purpose of this thesis is to provide a theoretical framework and its evaluation methodology of team dynamic task performance of operating team at nuclear power plant under the dynamic and tactical environment such as radiological accident. This thesis suggested a team dynamic task performance evaluation model so called team crystallization model stemmed from Endsely's situation awareness model being comprised of four elements: state, information, organization, and orientation and its quantification methods using system dynamics approach and a communication process model based on a receding horizon control approach. The team crystallization model is a holistic approach for evaluating the team dynamic task performance in conjunction with team situation awareness considering physical system dynamics and team behavioral dynamics for a tactical and dynamic task at nuclear power plant. This model provides a systematic measure to evaluate time-dependent team effectiveness or performance affected by multi-agents such as plant states, communication quality in terms of transferring situation-specific information and strategies for achieving the team task goal at given time, and organizational factors. To demonstrate the applicability of the proposed model and its quantification method, the case study was carried out using the data obtained from a full-scope power plant simulator for 1,000MWe pressurized water reactors with four on-the-job operating groups and one expert group who knows accident sequences. Simulated results team dynamic task performance with reference key plant parameters behavior and team-specific organizational center of gravity and cue-and-response matrix illustrated good symmetry with observed value. The team crystallization model will be useful and effective tool for evaluating team effectiveness in terms of recruiting new operating team for new plant as cost-benefit manner. Also, this model can be utilized as a systematic analysis tool for

  17. Study on dynamic team performance evaluation methodology based on team situation awareness model

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Suk Chul

    2005-02-15

    The purpose of this thesis is to provide a theoretical framework and its evaluation methodology of team dynamic task performance of operating team at nuclear power plant under the dynamic and tactical environment such as radiological accident. This thesis suggested a team dynamic task performance evaluation model so called team crystallization model stemmed from Endsely's situation awareness model being comprised of four elements: state, information, organization, and orientation and its quantification methods using system dynamics approach and a communication process model based on a receding horizon control approach. The team crystallization model is a holistic approach for evaluating the team dynamic task performance in conjunction with team situation awareness considering physical system dynamics and team behavioral dynamics for a tactical and dynamic task at nuclear power plant. This model provides a systematic measure to evaluate time-dependent team effectiveness or performance affected by multi-agents such as plant states, communication quality in terms of transferring situation-specific information and strategies for achieving the team task goal at given time, and organizational factors. To demonstrate the applicability of the proposed model and its quantification method, the case study was carried out using the data obtained from a full-scope power plant simulator for 1,000MWe pressurized water reactors with four on-the-job operating groups and one expert group who knows accident sequences. Simulated results team dynamic task performance with reference key plant parameters behavior and team-specific organizational center of gravity and cue-and-response matrix illustrated good symmetry with observed value. The team crystallization model will be useful and effective tool for evaluating team effectiveness in terms of recruiting new operating team for new plant as cost-benefit manner. Also, this model can be utilized as a systematic analysis tool for

  18. IAEA Leads Operational Safety Mission to Muehleberg Nuclear Power Plant

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: An international team of nuclear safety experts led by the International Atomic Energy Agency today concluded a review of the safety practices at the Muehleberg Nuclear Power Plant (NPP) near Bern in Switzerland. The team noted a series of good practices and made recommendations and suggestions to reinforce them. The IAEA assembled the Operational Safety Review Team at the request of the Swiss government. The team, led by the IAEA's Division of Nuclear Installation Safety, performed an in-depth operational safety review from 8 to 25 October 2012. The team comprised experts from Belgium, the Czech Republic, Finland, Germany, Hungary, Slovakia, Sweden, the United Kingdom and the United States as well as experts from the IAEA. The team conducted an in-depth review of the aspects essential to the safe operation of the Muehleberg NPP. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry, Emergency Planning and Preparedness, Severe Accident Management and Long-Term Operation. The OSART team made 10 recommendations and 11 suggestions related to areas where operations of Muehleberg NPP could be further improved, for example: - Plant management could improve the operating experience program and methods throughout the plant to ensure corrective actions are taken in a timely manner; - In the area of Long-Term Operation, the ageing management review for some systems and components is not complete and the environmental qualification of originally installed safety cables has not yet been revalidated for long-term operation; and - The plant provisions for the protection of persons on the site during an emergency with radioactive release can be improved to minimize health risks to plant personnel. The team also identified 10 good

  19. Can statisticians beat surgeons at the planning of operations?

    NARCIS (Netherlands)

    Joustra, Paul; Meester, Reinier; van Ophem, Hans

    2013-01-01

    The planning of operations in the Academic Medical Center is primarily based on the assessments of the length of the operation by the surgeons. We investigate whether duration models employing the information available at the moment the planning is made, offer a better alternative. Our empirical

  20. Can statisticians beat surgeons at the planning of operations?

    NARCIS (Netherlands)

    Joustra, P.; Meester, R.; van Ophem, H.

    2011-01-01

    The planning of operations in the Academic Medical Center is primarily based on the assessments of the length of the operation by the surgeons. We investigate whether duration models employing the information available at the moment the planning is made, offer a better alternative. Our empirical

  1. A Quantitative Team Situation Awareness Measurement Method Considering Technical and Nontechnical Skills of Teams

    Directory of Open Access Journals (Sweden)

    Ho Bin Yim

    2016-02-01

    Full Text Available Human capabilities, such as technical/nontechnical skills, have begun to be recognized as crucial factors for nuclear safety. One of the most common ways to improve human capabilities in general is training. The nuclear industry has constantly developed and used training as a tool to increase plant efficiency and safety. An integrated training framework was suggested for one of those efforts, especially during simulation training sessions of nuclear power plant operation teams. The developed training evaluation methods are based on measuring the levels of situation awareness of teams in terms of the level of shared confidence and consensus as well as the accuracy of team situation awareness. Verification of the developed methods was conducted by analyzing the training data of real nuclear power plant operation teams. The teams that achieved higher level of shared confidence showed better performance in solving problem situations when coupled with high consensus index values. The accuracy of nuclear power plant operation teams' situation awareness was approximately the same or showed a similar trend as that of senior reactor operators' situation awareness calculated by a situation awareness accuracy index (SAAI. Teams that had higher SAAI values performed better and faster than those that had lower SAAI values.

  2. A Constrained and Versioned Data Model for TEAM Data

    Science.gov (United States)

    Andelman, S.; Baru, C.; Chandra, S.; Fegraus, E.; Lin, K.

    2009-04-01

    The objective of the Tropical Ecology Assessment and Monitoring Network (www.teamnetwork.org) is "To generate real time data for monitoring long-term trends in tropical biodiversity through a global network of TEAM sites (i.e. field stations in tropical forests), providing an early warning system on the status of biodiversity to effectively guide conservation action". To achieve this, the TEAM Network operates by collecting data via standardized protocols at TEAM Sites. The standardized TEAM protocols include the Climate, Vegetation and Terrestrial Vertebrate Protocols. Some sites also implement additional protocols. There are currently 7 TEAM Sites with plans to grow the network to 15 by June 30, 2009 and 50 TEAM Sites by the end of 2010. At each TEAM Site, data is gathered as defined by the protocols and according to a predefined sampling schedule. The TEAM data is organized and stored in a database based on the TEAM spatio-temporal data model. This data model is at the core of the TEAM Information System - it consumes and executes spatio-temporal queries, and analytical functions that are performed on TEAM data, and defines the object data types, relationships and operations that maintain database integrity. The TEAM data model contains object types including types for observation objects (e.g. bird, butterfly and trees), sampling unit, person, role, protocol, site and the relationship of these object types. Each observation data record is a set of attribute values of an observation object and is always associated with a sampling unit, an observation timestamp or time interval, a versioned protocol and data collectors. The operations on the TEAM data model can be classified as read operations, insert operations and update operations. Following are some typical operations: The operation get(site, protocol, [sampling unit block, sampling unit,] start time, end time) returns all data records using the specified protocol and collected at the specified site, block

  3. A Framework to Support the Fusion of Operation and Planning

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Yousu; Etingov, Pavel V.; Fitzhenry, Erin B.; Sharma, Poorva; Nguyen, Tony B.; Makarov, Yuri V.; Rice, Mark J.; Allwardt, Craig H.; Widergren, Steven E.

    2015-12-31

    The management of the nation’s power system has progressed to the point where the boundary lines between operations and planning are becoming blurred. The dynamic behavior of smart grid technologies brings pressures of incorporating the predictive capability from planning to enhance operations. These needs are requiring a smoother, better integrated interplay between the functional roles of planning and operations. This paper presents a framework to support the fusion of operation and planning. A case study of predicting the intra-hour deficiency in generation capability and ramping capacity and presenting the outputs to operators was conducted. The study shows the benefits of the fusion and the effectiveness of the framework. All the function blocks used in the study were built upon GridOPTICS Software System (GOSS), a software system middleware platform that facilitates deployment of new applications for the future power grid.

  4. Decommissioning Planning during the Operation of the Loviisa NPP. Planning, Management and Organizational Aspects

    Energy Technology Data Exchange (ETDEWEB)

    Tuunanen, J. P.; Eurajoki, T. E.E., [Fortum Power and Heat Ltd, Nuclear Waste Espoo (Finland)

    2013-08-15

    The first decommissioning plan for Loviisa nuclear power plant was written already in 1980's, when the plant had just started operation. The plan has been updated in 5-6 years intervals and this work still continues towards the final decommissioning plan. The decommissioning plan is based on immediate dismantling option and final disposal of decommissioning waste to the extension of the on site final disposal facility for low and intermediate level waste. The decommissioning planning has been organized as an independent project, which is realised in close cooperation with Fortum's research programme on radioactive waste management. The plant personnel are involved in the planning work through providing operating experience on contamination and activation of systems, structures and components. Later in the decommissioning phase the plant personnel will form the main part of the decommissioning organization. (author)

  5. An innovative approach to capability-based emergency operations planning.

    Science.gov (United States)

    Keim, Mark E

    2013-01-01

    This paper describes the innovative use information technology for assisting disaster planners with an easily-accessible method for writing and improving evidence-based emergency operations plans. This process is used to identify all key objectives of the emergency response according to capabilities of the institution, community or society. The approach then uses a standardized, objective-based format, along with a consensus-based method for drafting capability-based operational-level plans. This information is then integrated within a relational database to allow for ease of access and enhanced functionality to search, sort and filter and emergency operations plan according to user need and technological capacity. This integrated approach is offered as an effective option for integrating best practices of planning with the efficiency, scalability and flexibility of modern information and communication technology.

  6. 7 CFR 623.13 - Wetlands reserve plan of operations.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Wetlands reserve plan of operations. 623.13 Section... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE WATER RESOURCES EMERGENCY WETLANDS RESERVE PROGRAM § 623.13 Wetlands reserve plan of operations. (a) After NRCS has accepted the applicant for enrollment in the...

  7. Operational Readiness Review Final Report for K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    An Operational Readiness Review (ORR) was conducted by the U.S. Department of Energy (DOE), Richland Operations Office (RL) to verify that an adequate state of readiness had been achieved for startup of the K Basin Fuel Transfer System (FTS). The DOE ORR was conducted during the period November 6-18, 2002. The DOE ORR team concluded that the K Basin Fuel Transfer System is ready to start operations, subject to completion and verification of identified pre-start findings. The ORR was conducted in accordance with the Spent Nuclear Fuel (SNF) K Basin Fuel Transfer System (FTS) Operational Readiness Review (ORR) Plan of Action and the Operational Readiness Review Implementation Plan for K Basin Fuel Transfer System. Review activities consisted of staff interviews, procedure and document reviews, and observations of normal facility operations, operational upset conditions, and an emergency drill. The DOE ORR Team also reviewed and assessed the adequacy of the contractor ORR3 and the RL line management review. The team concurred with the findings and observations identified in these two reports. The DOE ORR for the FTS evaluated the contractor under single-shift operations. Of concern to the ORR Team was that SNF Project management intended to change from a single-shift FTS operation to a two-shift operation shortly after the completion of the DOE ORR. The ORR team did not assess two-shift FTS operations and the ability of the contractor to conduct a smooth transition from shift to shift. However, the DOE ORR team did observe an operational upset drill that was conducted during day shift and carried over into swing shift; during this drill, swing shift was staffed with fewer personnel as would be expected for two-shift operations. The facility was able to adequately respond to the event with the reduced level of staff. The ORR Team was also able to observe a Shift Manager turnover meeting when one shift manager had to be relieved during the middle of the day. The ORR

  8. A compilation of necessary elements for a local government continuity of operations plan

    OpenAIRE

    Cashen, Kevin M.

    2006-01-01

    CHDS State/Local National and state homeland security strategies call for continuity of operations plan development. The 2006 Nationwide Plan Review Phase II Report identifies continuity of operations plan development as a state and local goal with a federal goal of providing continuity of operations plan development support. Most local governments do not have a continuity of operation plan or it needs to be updated. Continuity of operations plan guidance is provided by a variety of intern...

  9. Multi Sector Planning Tools for Trajectory-Based Operations

    Science.gov (United States)

    Prevot, Thomas; Mainini, Matthew; Brasil, Connie

    2010-01-01

    This paper discusses a suite of multi sector planning tools for trajectory-based operations that were developed and evaluated in the Airspace Operations Laboratory (AOL) at the NASA Ames Research Center. The toolset included tools for traffic load and complexity assessment as well as trajectory planning and coordination. The situation assessment tools included an integrated suite of interactive traffic displays, load tables, load graphs, and dynamic aircraft filters. The planning toolset allowed for single and multi aircraft trajectory planning and data communication-based coordination of trajectories between operators. Also newly introduced was a real-time computation of sector complexity into the toolset that operators could use in lieu of aircraft count to better estimate and manage sector workload, especially in situations with convective weather. The tools were used during a joint NASA/FAA multi sector planner simulation in the AOL in 2009 that had multiple objectives with the assessment of the effectiveness of the tools being one of them. Current air traffic control operators who were experienced as area supervisors and traffic management coordinators used the tools throughout the simulation and provided their usefulness and usability ratings in post simulation questionnaires. This paper presents these subjective assessments as well as the actual usage data that was collected during the simulation. The toolset was rated very useful and usable overall. Many elements received high scores by the operators and were used frequently and successfully. Other functions were not used at all, but various requests for new functions and capabilities were received that could be added to the toolset.

  10. 30 CFR 285.620 - What is a Construction and Operations Plan (COP)?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Construction and Operations Plan (COP... Information Requirements Construction and Operations Plan for Commercial Leases § 285.620 What is a Construction and Operations Plan (COP)? The COP describes your construction, operations, and conceptual...

  11. NASA Microgravity Science Competition for High-school-aged Student Teams

    Science.gov (United States)

    DeLombard, Richard; Stocker, Dennis; Hodanbosi, Carol; Baumann, Eric

    2002-01-01

    NASA participates in a wide variety of educational activities including competitive events. There are competitive events sponsored by NASA and student teams which are mentored by NASA centers. This participation by NASA in public forums serves to bring the excitement of aerospace science to students and educators. A new competition for highschool-aged student teams involving projects in microgravity has completed two pilot years and will have national eligibility for teams during the 2002-2003 school year. A team participating in the Dropping In a Microgravity Environment will research the field of microgravity, develop a hypothesis, and prepare a proposal for an experiment to be conducted in a microgravity drop tower facility. A team of NASA scientists and engineers will select the top proposals and those teams will then design and build their experiment apparatus. When the experiment apparatus are completed, team representatives will visit NASA Glenn in Cleveland, Ohio for operation of their facility and participate in workshops and center tours. Presented in this paper will be a description of DIME, an overview of the planning and execution of such a program, results from the first two pilot years, and a status of the first national competition.

  12. Advance Care Planning: Understanding Clinical Routines and Experiences of Interprofessional Team Members in Diverse Health Care Settings.

    Science.gov (United States)

    Arnett, Kelly; Sudore, Rebecca L; Nowels, David; Feng, Cindy X; Levy, Cari R; Lum, Hillary D

    2017-12-01

    Interprofessional health care team members consider advance care planning (ACP) to be important, yet gaps remain in systematic clinical routines to support ACP. A clearer understanding of the interprofessional team members' perspectives on ACP clinical routines in diverse settings is needed. One hundred eighteen health care team members from community-based clinics, long-term care facilities, academic clinics, federally qualified health centers, and hospitals participated in a 35-question, cross-sectional online survey to assess clinical routines, workflow processes, and policies relating to ACP. Respondents were 53% physicians, 18% advanced practice nurses, 11% nurses, and 18% other interprofessional team members including administrators, chaplains, social workers, and others. Regarding clinical routines, respondents reported that several interprofessional team members play a role in facilitating ACP (ie, physician, social worker, nurse, others). Most (62%) settings did not have, or did not know of, policies related to ACP documentation. Only 14% of settings had a patient education program. Two-thirds of the respondents said that addressing ACP is a high priority and 85% felt that nonphysicians could have ACP conversations with appropriate training. The clinical resources needed to improve clinical routines included training for providers and staff, dedicated staff to facilitate ACP, and availability of patient/family educational materials. Although interprofessional health care team members consider ACP a priority and several team members may be involved, clinical settings lack systematic clinical routines to support ACP. Patient educational materials, interprofessional team training, and policies to support ACP clinical workflows that do not rely solely on physicians could improve ACP across diverse clinical settings.

  13. Gravity Plant Physiology Facility (GPPF) Team in the Spacelab Payload Operations Control Center (SL

    Science.gov (United States)

    1992-01-01

    The primary payload for Space Shuttle Mission STS-42, launched January 22, 1992, was the International Microgravity Laboratory-1 (IML-1), a pressurized manned Spacelab module. The goal of IML-1 was to explore in depth the complex effects of weightlessness of living organisms and materials processing. Around-the-clock research was performed on the human nervous system's adaptation to low gravity and effects of microgravity on other life forms such as shrimp eggs, lentil seedlings, fruit fly eggs, and bacteria. Materials processing experiments were also conducted, including crystal growth from a variety of substances such as enzymes, mercury iodide, and a virus. The Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at the Marshall Space Flight Center (MSFC) was the air/ground communication channel used between the astronauts and ground control teams during the Spacelab missions. Featured is the Gravity Plant Physiology Facility (GPPF) team in the SL POCC during the IML-1 mission.

  14. Getting a head start: high-fidelity, simulation-based operating room team training of interprofessional students.

    Science.gov (United States)

    Paige, John T; Garbee, Deborah D; Kozmenko, Valeriy; Yu, Qingzhao; Kozmenko, Lyubov; Yang, Tong; Bonanno, Laura; Swartz, William

    2014-01-01

    Effective teamwork in the operating room (OR) is often undermined by the "silo mentality" of the differing professions. Such thinking is formed early in one's professional experience and is fostered by undergraduate medical and nursing curricula lacking interprofessional education. We investigated the immediate impact of conducting interprofessional student OR team training using high-fidelity simulation (HFS) on students' team-related attitudes and behaviors. Ten HFS OR interprofessional student team training sessions were conducted involving 2 standardized HFS scenarios, each of which was followed by a structured debriefing that targeted team-based competencies. Pre- and post-session mean scores were calculated and analyzed for 15 Likert-type items measuring self-efficacy in teamwork competencies using the t-test. Additionally, mean scores of observer ratings of team performance after each scenario and participant ratings after the second scenario for an 11-item Likert-type teamwork scale were calculated and analyzed using one-way ANOVA and t-test. Eighteen nursing students, 20 nurse anesthetist students, and 28 medical students participated in the training. Statistically significant gains from mean pre- to post-training scores occurred on 11 of the 15 self-efficacy items. Statistically significant gains in mean observer performance scores were present on all 3 subscales of the teamwork scale from the first scenario to the second. A statistically significant difference was found in comparisons of mean observer scores with mean participant scores for the team-based behaviors subscale. High-fidelity simulation OR interprofessional student team training improves students' team-based attitudes and behaviors. Students tend to overestimate their team-based behaviors. Copyright © 2014 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

  15. ExoMars Trace Gas Orbiter Instrument Modelling Approach to Streamline Science Operations

    Science.gov (United States)

    Munoz Fernandez, Michela; Frew, David; Ashman, Michael; Cardesin Moinelo, Alejandro; Garcia Beteta, Juan Jose; Geiger, Bernhard; Metcalfe, Leo; Nespoli, Federico; Muniz Solaz, Carlos

    2018-05-01

    ExoMars Trace Gas Orbiter (TGO) science operations activities are centralised at ESAC's Science Operations Centre (SOC). The SOC receives the inputs from the principal investigators (PIs) in order to implement and deliver the spacecraft pointing requests and instrument timelines to the Mission Operations Centre (MOC). The high number of orbits per planning cycle has made it necessary to abstract the planning interactions between the SOC and the PI teams at the observation level. This paper describes the modelling approach we have conducted for TGOís instruments to streamline science operations. We have created dynamic observation types that scale to adapt to the conditions specified by the PI teams including observation timing, and pointing block parameters calculated from observation geometry. This approach is considered and improvement with respect to previous missions where the generation of the observation pointing and commanding requests was performed manually by the instrument teams. Automation software assists us to effectively handle the high density of planned orbits with increasing volume of scientific data and to successfully meet opportunistic scientific goals and objectives. Our planning tool combines the instrument observation definition files provided by the PIs together with the flight dynamics products to generate the Pointing Requests and the instrument timeline (ITL). The ITL contains all the validated commands at the TC sequence level and computes the resource envelopes (data rate, power, data volume) within the constraints. At the SOC, our main goal is to maximise the science output while minimising the number of iterations among the teams, ensuring that the timeline does not violate the state transitions allowed in the Mission Operations Rules and Constraints Document.

  16. Multidisciplinary team functioning.

    Science.gov (United States)

    Kovitz, K E; Dougan, P; Riese, R; Brummitt, J R

    1984-01-01

    This paper advocates the need to move beyond interdisciplinary team composition as a minimum criterion for multidisciplinary functioning in child abuse treatment. Recent developments within the field reflect the practice of shared professional responsibility for detection, case management and treatment. Adherence to this particular model for intervention requires cooperative service planning and implementation as task related functions. Implicitly, this model also carries the potential to incorporate the supportive functioning essential to effective group process. However, explicit attention to the dynamics and process of small groups has been neglected in prescriptive accounts of multidisciplinary child abuse team organization. The present paper therefore focuses upon the maintenance and enhancement aspects of multidisciplinary group functioning. First, the development and philosophy of service for the Alberta Children's Hospital Child Abuse Program are reviewed. Second, composition of the team, it's mandate for service, and the population it serves are briefly described. Third, the conceptual framework within which the program functions is outlined. Strategies for effective group functioning are presented and the difficulties encountered with this model are highlighted. Finally, recommendations are offered for planning and implementing a multidisciplinary child abuse team and for maintaining its effective group functioning.

  17. Future In-Space Operations (FISO): A Working Group and Community Engagement

    Science.gov (United States)

    Thronson, Harley; Lester, Dan

    2013-01-01

    Long-duration human capabilities beyond low Earth orbit (LEO), either in support of or as an alternative to lunar surface operations, have been assessed at least since the late 1960s. Over the next few months, we will present short histories of concepts for long-duration, free-space human habitation beyond LEO from the end of the Apollo program to the Decadal Planning Team (DPT)/NASA Exploration Team (NExT), which was active in 1999 2000 (see Forging a vision: NASA s Decadal Planning Team and the origins of the Vision for Space Exploration , The Space Review, December 19, 2005). Here we summarize the brief existence of the Future In-Space Operations (FISO) working group in 2005 2006 and its successor, a telecon-based colloquium series, which we co-moderate.

  18. Approach to team skills training

    International Nuclear Information System (INIS)

    Koontz, J.L.; Roe, M.L.; Gaddy, C.D.

    1987-01-01

    The US commercial nuclear power industry has recognized the importance of team skills in control room operation. The desire to combine training of team interaction skills, like communications, with technical knowledge of reactor operations requires a unique approach to training. An NRC-sponsored study identified a five-phase approach to team skills training designed to be consistent with the systems approach to training currently endorsed by the NRC Policy Statement on Training and Qualification. This paper describes an approach to team skills training with emphasis on the nuclear power plant control room crew. An approach to team skills training

  19. Knowledge-Based operation planning system for boiling water reactors

    International Nuclear Information System (INIS)

    Tatsuya Iwamoto; Shungo Sakurai; Hitoshi Uematsu; Makoto Tsuiki

    1987-01-01

    A knowledge-Based Boiling Water Reactor operation planning system was developed to support core operators or core management engineers in making core operation plans, by automatically generating suboptimum core operation procedures. The procedures are obtained by searching a branching tree of the possible core status (nodes) and the elementary operations to change the core status (branches). A path that ends at the target node, and contains only operationally feasible nodes can be a candidate of the solution. The core eigenvalue, the power distribution and the thermal limit parameters at key points are calculated by running a three-dimensional (3-D) BWR core physics simulator to examine the feasibility of the nodes and the performance of candidates. To obtain a practically acceptable solution within a reasonable time rather than making a time-consuming effort to get the optimum one, the Depth-First-Search method, together with the heuristic branch-bounding, was used to search the branching tree. The system was applied to actual operation plannings with real plant data, and gave satisfactory results. It can be concluded that the system can be applied to generate core operation procedures as a substitute for core management experts

  20. Remedial design work plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-02-01

    The Remedial Design Work Plan (RDWP) for the Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee, has been prepared. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative, as stated in the Record of Decision (ROD) was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Thereafter, a public hearing was held to review the proposed plan. Comments were incorporated. The revised selected remedy, per the ROD is to excavate and dispose of floodplain soils contaminated above the remediation goal of 400 parts per million mercury. The approved ROD with this goal will be the basis for remedial design (RD). The RD work plan (RDWP) is composed of six chapters. An introductory chapter describes the purpose and scope of the RDWP, the selected remedy as identified by the ROD; the roles and responsibilities of the RD team members, and the site background information, including site history, contaminants of concern, and site characteristics. Chapter 2 contains the design objectives, RD approach, regulatory considerations during RD, and the design criteria with assumptions. Chapter 3 presents the RD planning process to prepare this RDWP, as well as secondary RD support plans. Chapter 4 describes the scope of the RD activities in more detail and identifies what will be included in the design package. Chapter 5 presents the schedule for performance of the RD activities, identifying key RD milestones. Specific documents used in the preparation of this document are referenced in Chapter 6

  1. 30 CFR 250.290 - What operations require approval of the Conceptual Plan?

    Science.gov (United States)

    2010-07-01

    ... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and Information Deepwater Operations Plans (dwop) § 250.290 What operations require approval of the Conceptual Plan? You may... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What operations require approval of the...

  2. On-call emergency workload of a general surgical team

    Directory of Open Access Journals (Sweden)

    Jawaid Masood

    2009-01-01

    Full Text Available Background: To examine the on-call emergency workload of a general surgical team at a tertiary care teaching hospital to guide planning and provision of better surgical services. Patients and Methods: During six months period from August to January 2007; all emergency calls attended by general surgical team of Surgical Unit II in Accident and Emergency department (A and E and in other units of Civil, Hospital Karachi, Pakistan were prospectively recorded. Data recorded includes timing of call, diagnosis, operation performed and outcome apart from demography. Results: Total 456 patients (326 males and 130 females were attended by on-call general surgery team during 30 emergency days. Most of the calls, 191 (41.9% were received from 8 am to 5 pm. 224 (49.1% calls were of abdominal pain, with acute appendicitis being the most common specific pathology in 41 (9.0% patients. Total 73 (16.0% calls were received for trauma. Total 131 (28.7% patients were admitted in the surgical unit for urgent operation or observation while 212 (46.5% patients were discharged from A and E. 92 (20.1% patients were referred to other units with medical referral accounts for 45 (9.8% patients. Total 104 (22.8% emergency surgeries were done and the most common procedure performed was appendicectomy in 34 (32.7% patients. Conclusion: Major workload of on-call surgical emergency team is dealing with the acute conditions of abdomen. However, significant proportion of patients are suffering from other conditions including trauma that require a holistic approach to care and a wide range of skills and experience. These results have important implications in future healthcare planning and for the better training of general surgical residents.

  3. Ra reactor operation plan for 1976 - Annex 6

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-01-01

    Contrary to previous years the RA reactor operation plan for 1976 is conditioned by more uncertainties than ever for the following reasons. It is planned for February to repair the components in order to eliminate the consequences of leaking from the vertical experimental channel VK-4 which happened in december 1975. Apart from this, measurements related to transfer of the core to highly enriched fuel under minimum power are foreseen to be performed in February. In April, it would be indispensable to locate the point of He gas leaking and its prevention. Core transfer to highly enriched fuel is planned for April for testing of the fuel elements under operating conditions and step by step increase of the power density up to the nominal power. Complete plan for core transfer would be available by the end of February 1976. It is planned to make-up for the mentioned delays from May-December 1976 [sr

  4. Team Learning: Through the Relational Dynamics of Co-operation and Rivalry in Team Communities

    Science.gov (United States)

    Lotz, Maja

    2010-01-01

    This paper explores the constructive links between cooperation, rivalry, and learning within the structure of team communities. Drawing upon social learning theory and qualitative data from case studies conducted in Danish team-based firms, the main purpose is to argue that both cooperation and rivalry are important triggers for mobilizing…

  5. Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...

  6. Team Training for Dynamic Cross-Functional Teams in Aviation: Behavioral, Cognitive, and Performance Outcomes.

    Science.gov (United States)

    Littlepage, Glenn E; Hein, Michael B; Moffett, Richard G; Craig, Paul A; Georgiou, Andrea M

    2016-12-01

    This study evaluates the effectiveness of a training program designed to improve cross-functional coordination in airline operations. Teamwork across professional specializations is essential for safe and efficient airline operations, but aviation education primarily emphasizes positional knowledge and skill. Although crew resource management training is commonly used to provide some degree of teamwork training, it is generally focused on specific specializations, and little training is provided in coordination across specializations. The current study describes and evaluates a multifaceted training program designed to enhance teamwork and team performance of cross-functional teams within a simulated airline flight operations center. The training included a variety of components: orientation training, position-specific declarative knowledge training, position-specific procedural knowledge training, a series of high-fidelity team simulations, and a series of after-action reviews. Following training, participants demonstrated more effective teamwork, development of transactive memory, and more effective team performance. Multifaceted team training that incorporates positional training and team interaction in complex realistic situations and followed by after-action reviews can facilitate teamwork and team performance. Team training programs, such as the one described here, have potential to improve the training of aviation professionals. These techniques can be applied to other contexts where multidisciplinary teams and multiteam systems work to perform highly interdependent activities. © 2016, Human Factors and Ergonomics Society.

  7. Developing standardized facility contingency plans

    International Nuclear Information System (INIS)

    Davidson, D.A.

    1993-01-01

    Texaco consists of several operating departments that are, in effect, independent companies. Each of these departments is responsible for complying with all environmental laws and regulations. This includes the preparation by each facility to respond to an oil spill at that location. For larger spills, however, management of the response will rest with corporate regional response teams. Personnel from all departments make up the regional teams. In 1990, Congress passed the Oil Pollution Act. In 1991, the US Coast Guard began developing oil spill response contingency plan regulations, which they are still working on. Meanwhile, four of the five west coast states have also passed laws requiring contingency plans. (Only Hawaii has chosen to wait and see what the federal regulations will entail). Three of the states have already adopted regulations. Given these laws and regulations, along with its corporate structure, Texaco addressed the need to standardize local facility plans as well as its response organization. This paper discusses how, by working together, the Texaco corporate international oil spill response staff and the Texaco western region on-scene commander developed: A standard contingency plan format crossing corporate boundaries and meeting federal and state requirements. A response organization applicable to any size facility or spill. A strategy to sell the standard contingency plan and response organization to the operating units

  8. Interview: Mr. Stephen Chee, team leader, UNFPA country support team (CST) for the South Pacific.

    Science.gov (United States)

    1993-09-01

    The UNFPA country support team (CST) for the South Pacific is the action-arm at the regional level of the new Technical Support Services arrangement introduced by the agency. Operational since April 1993, the CST currently covers the following Pacific island countries or territories: the Cook Islands, the Federated States of Micronesia, Fiji, Kiribati, Marshall Islands, Nauru, Niue, Palau, Papua New Guinea, Samoa, Solomon Islands, Tokelau, Tonga, Tuvalu, and Vanuatu. The CST office is located in Suva, Fiji, with the main goal of strengthening national capacity and building self-reliance in the countries of the region. The office in Suva is currently staffed by six highly qualified advisors with extensive experience in the population and related fields; two more advisors are expected to join the Team in early 1994. The Team is well equipped to provide countries and territories of the region with a wide range of technical support services ranging from ad hoc technical advisory services to the conceptualization and development of comprehensive population policies and programs. Services are offered in the areas of basic data collection, processing, and research in population dynamics; population policy formulation, evaluation, and implementation; family planning and maternal-child health; information, education, and communication; women in population and development; and population program management. The team also plays an advocacy role in mainstreaming population concerns into the programs and activities of international, regional, and national organizations. The team leader responds to questions about population problems experienced by the countries served, the scope of UNFPA assistance to country governments in the subregion, the importance of population information in the subregion, and how Asia-Pacific POPIN may help the team and countries served.

  9. Collaborative planning of operations in industrial symbiosis

    DEFF Research Database (Denmark)

    Herczeg, Gabor; Akkerman, Renzo

    2014-01-01

    Industrial symbiosis (IS) is cooperation between companies to achieve collective benefits by supplying and reusing industrial waste to substitute virgin resources in production. In this paper, we investigate the IS phenomenon from a supply chain management perspective. We propose a collaborative...... planning model to coordinate master planning of operations of waste suppliers and buyers. Furthermore, we analyze planning decisions related to IS when waste exchange is combined with virgin resource procurement. We demonstrate that conditions of virgin resource procurement affect the economic feasibility...

  10. Determinants of treatment plan implementation in multidisciplinary team meetings for patients with chronic diseases: a mixed-methods study.

    Science.gov (United States)

    Raine, Rosalind; Xanthopoulou, Penny; Wallace, Isla; Nic A' Bháird, Caoimhe; Lanceley, Anne; Clarke, Alex; Livingston, Gill; Prentice, Archie; Ardron, Dave; Harris, Miriam; King, Michael; Michie, Susan; Blazeby, Jane M; Austin-Parsons, Natalie; Gibbs, Simon; Barber, Julie

    2014-10-01

    Multidisciplinary team (MDT) meetings are assumed to produce better decisions and are extensively used to manage chronic disease in the National Health Service (NHS). However, evidence for their effectiveness is mixed. Our objective was to investigate determinants of MDT effectiveness by examining factors influencing the implementation of MDT treatment plans. This is a proxy measure of effectiveness, because it lies on the pathway to improvements in health, and reflects team decision making which has taken account of clinical and non-clinical information. Additionally, this measure can be compared across MDTs for different conditions. We undertook a prospective mixed-methods study of 12 MDTs in London and North Thames. Data were collected by observation of 370 MDT meetings, interviews with 53 MDT members, and from 2654 patient medical records. We examined the influence of patient-related factors (disease, age, sex, deprivation, whether their preferences and other clinical/health behaviours were mentioned) and MDT features (as measured using the 'Team Climate Inventory' and skill mix) on the implementation of MDT treatment plans. The adjusted odds (or likelihood) of implementation was reduced by 25% for each additional professional group represented at the MDT meeting. Implementation was more likely in MDTs with clear goals and processes and a good 'Team Climate' (adjusted OR 1.96; 95% CI 1.15 to 3.31 for a unit increase in Team Climate Inventory (TCI) score). Implementation varied by disease category, with the lowest adjusted odds of implementation in mental health teams. Implementation was also lower for patients living in more deprived areas (adjusted odds of implementation for patients in the most compared with least deprived areas was 0.60, 95% CI 0.39 to 0.91). Greater multidisciplinarity is not necessarily associated with more effective decision making. Explicit goals and procedures are also crucial. Decision implementation should be routinely monitored to

  11. Team Training through Communications Control

    Science.gov (United States)

    1982-02-01

    training * operational environment * team training research issues * training approach * team communications * models of operator beharior e...on the market soon, it certainly would be investigated carefully for its applicability to the team training problem. ce A text-to-speech voice...generation system. Votrax has recently marketed such a device, and others may soon follow suit. ’ d. A speech replay system designed to produce speech from

  12. Sand and gravel mine operations and reclamation planning using microcomputers

    Energy Technology Data Exchange (ETDEWEB)

    Ariffin, J.B.

    1990-02-01

    The purpose of this study is to focus on the application of microcomputers, also known as personal computers, in planning for sand and gravel mine operations and reclamation at a site in Story County, Iowa. This site, called the Arrasmith Pit, is operated by Martin Marietta Aggregates, Inc. The Arrasmith site, which encompasses an area of about 25 acres, is a relatively small site for aggregate mining. However, planning for the concurrent mine operation and reclamation program at this site is just as critical as with larger sites and the planning process is the same.

  13. The influence of individual and team cognitive ability on operators' task and safety performance: a multilevel field study in nuclear power plants.

    Directory of Open Access Journals (Sweden)

    Jingyu Zhang

    Full Text Available While much research has investigated the predictors of operators' performance such as personality, attitudes and motivation in high-risk industries, its cognitive antecedents and boundary conditions have not been fully investigated. Based on a multilevel investigation of 312 nuclear power plant main control room operators from 50 shift teams, the present study investigated how general mental ability (GMA at both individual and team level can influence task and safety performance. At the individual level, operators' GMA was predictive of their task and safety performance and this trend became more significant as they accumulated more experience. At the team level, we found team GMA had positive influences on all three performance criteria. However, we also found a "big-fish-little-pond" effect insofar as team GMA had a relatively smaller effect and inhibited the contribution of individual GMA to workers' extra-role behaviors (safety participation compared to its clear beneficial influence on in-role behaviors (task performance and safety compliance. The possible mechanisms related to learning and social comparison processes are discussed.

  14. The influence of individual and team cognitive ability on operators' task and safety performance: a multilevel field study in nuclear power plants.

    Science.gov (United States)

    Zhang, Jingyu; Li, Yongjuan; Wu, Changxu

    2013-01-01

    While much research has investigated the predictors of operators' performance such as personality, attitudes and motivation in high-risk industries, its cognitive antecedents and boundary conditions have not been fully investigated. Based on a multilevel investigation of 312 nuclear power plant main control room operators from 50 shift teams, the present study investigated how general mental ability (GMA) at both individual and team level can influence task and safety performance. At the individual level, operators' GMA was predictive of their task and safety performance and this trend became more significant as they accumulated more experience. At the team level, we found team GMA had positive influences on all three performance criteria. However, we also found a "big-fish-little-pond" effect insofar as team GMA had a relatively smaller effect and inhibited the contribution of individual GMA to workers' extra-role behaviors (safety participation) compared to its clear beneficial influence on in-role behaviors (task performance and safety compliance). The possible mechanisms related to learning and social comparison processes are discussed.

  15. Improving reliability in south Ajax with IntelliTEAM

    Energy Technology Data Exchange (ETDEWEB)

    Starck, A.P. [Veridian Connections Inc., Ajax, ON (Canada)

    2010-07-01

    Veridian Connections Incorporated is a local electricity distribution company in Ontario that is faced with end of life feeder cables and an aging system. Most of the feeders are combined overhead and underground cables supplied from several substations with a limited transfer capability. The commercial activity in the utility's service area is intolerant to sustained outages. Although the initial plan was to replace the cables, capital and time constraints led the utility to chose the IntelliTEAM 2 system to improve reliability, by reducing the frequency, duration and impact of outages. The unique system is based on submersible switchgear, PulseClosing and includes the substation breakers as IntelliTEAM devices. The current plan to implement a smart grid turns sustained outages into momentary outages; reduces the number of customers affected by a sustained failure; improves the ability to transfer loads; and reduces stresses on aged cables. The self healing system restores customers in less than a minute and provides visibility to SCADA operators through a high speed SpeedNet radio system. tabs., figs.

  16. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  17. British Columbia inland oil spill response plan

    International Nuclear Information System (INIS)

    2005-01-01

    This paper presents an outline of the organization, procedures and duties of the provincial government in response to inland oil spills stemming from pipeline or tank-farm rupture, train derailment and vehicle accidents in British Columbia. Provincial response strategies were reviewed, along with their relationships to various policies and standards. Public, infrastructure and environmental protection were identified as key factors. Incident notification procedures were detailed, including outlines of roles, event criteria and call for incident management teams. Agreements and cost recovery issues were examined. The characteristics of site response were reviewed, including details of communications, tactical planning, and unified command among local and federal governments. The role of First Nations and responsible parties was also addressed. Details of shore cleanup, wildlife rescue, decontamination, and waste handling strategies were presented. The organization, missions and duties for an incident management team were outlined, along with a summary of operational guidelines and information on team positions and the establishment of joint information centres. The involvement of cooperating agencies was examined. An incident command system was also presented, including details of planning, operations, logistics, and organization. A checklist of individual duties was provided, with details of responsibilities, safety issues and general instructions for all team members. tabs., figs

  18. Evaluation of effects of an operational multidisciplinary team on antibiotic use in the medium to long term at a French university hospital.

    Science.gov (United States)

    Demoré, Béatrice; Humbert, Pauline; Boschetti, Emmanuelle; Bevilacqua, Sibylle; Clerc-Urmès, Isabelle; May, Thierry; Pulcini, Céline; Thilly, Nathalie

    2017-10-01

    Background Antibiotic-resistant bacteria are a major public health problem throughout the world. In 2006, in accordance with the national guidelines for antibiotic use, the CHRU of Nancy created an operational multidisciplinary antibiotic team at one of its sites. In 2011, a cluster-controlled trial showed that the operational multidisciplinary antibiotic team (the intervention) had a favourable short-term effect on antibiotic use and costs. Objective Our objective was to determine whether these effects continued over the medium to long term (that is, 2-7 years after creation of the operational multidisciplinary antibiotic team, 2009-2014). Setting The 1800-bed University Hospital of Nancy (France). Method The effect in the medium to long term is measured according to the same criteria and assessed by the same methods as the first study. A cluster controlled trial was performed on the period 2009-2014. The intervention group comprised 11 medical and surgical wards in settings where the operational multidisciplinary antibiotic team was implemented and the control group comprised 6 wards without this operational team. Main outcome measure Consumption of antibiotics overall and by therapeutic class (in defined daily doses per 1000 patient-days) and costs savings (in €). Results The reduction in antibiotic use and costs continued, but at a lower rate than in the short term (11% between 2009 and 2014 compared with 33% between 2007 and 2009) at the site of the intervention. The principal decreases concerned fluoroquinolones and glycopeptides. At the site without an operational multidisciplinary antibiotic team (the control group), total antibiotic use remained stable. Between 2009 and 2014, costs fell 10.5% in the intervention group and 5.7% in the control group. Conclusion This study shows that it is possible to maintain the effectiveness over time of such an intervention and demonstrates its role in defining a hospital's antibiotic policy.

  19. The Creation and Operation of Internal High Performance Modern Enterprises Team

    Institute of Scientific and Technical Information of China (English)

    Shengyu WANG

    2015-01-01

    The future of enterprises mainly depends on product research and development. For the modern enterprises, high performance project team is the most important means of R & D projects. According to the interviews and survey found of a plurality of enterprise project R & D team. the internal high performance team of modern business is good or bad, its key lies in whether the team managers for the team creation and management is in place, this is the most difficult place for the high performance team management system, especially the team leadership. Based on this, this paper discusses on the creation and management of high performance modern enterprise team, aiming to provide valuable reference for the enterprise team management.

  20. Integrating operation design into infrastructure planning to foster robustness of planned water systems

    Science.gov (United States)

    Bertoni, Federica; Giuliani, Matteo; Castelletti, Andrea

    2017-04-01

    Over the past years, many studies have looked at the planning and management of water infrastructure systems as two separate problems, where the dynamic component (i.e., operations) is considered only after the static problem (i.e., planning) has been resolved. Most recent works have started to investigate planning and management as two strictly interconnected faces of the same problem, where the former is solved jointly with the latter in an integrated framework. This brings advantages to multi-purpose water reservoir systems, where several optimal operating strategies exist and similar system designs might perform differently on the long term depending on the considered short-term operating tradeoff. An operationally robust design will be therefore one performing well across multiple feasible tradeoff operating policies. This work aims at studying the interaction between short-term operating strategies and their impacts on long-term structural decisions, when long-lived infrastructures with complex ecological impacts and multi-sectoral demands to satisfy (i.e., reservoirs) are considered. A parametric reinforcement learning approach is adopted for nesting optimization and control yielding to both optimal reservoir design and optimal operational policies for water reservoir systems. The method is demonstrated on a synthetic reservoir that must be designed and operated for ensuring reliable water supply to downstream users. At first, the optimal design capacity derived is compared with the 'no-fail storage' computed through Rippl, a capacity design function that returns the minimum storage needed to satisfy specified water demands without allowing supply shortfall. Then, the optimal reservoir volume is used to simulate the simplified case study under other operating objectives than water supply, in order to assess whether and how the system performance changes. The more robust the infrastructural design, the smaller the difference between the performances of

  1. Rapid improvement teams.

    Science.gov (United States)

    Alemi, F; Moore, S; Headrick, L; Neuhauser, D; Hekelman, F; Kizys, N

    1998-03-01

    Suggestions, most of which are supported by empirical studies, are provided on how total quality management (TQM) teams can be used to bring about faster organizationwide improvements. Ideas are offered on how to identify the right problem, have rapid meetings, plan rapidly, collect data rapidly, and make rapid whole-system changes. Suggestions for identifying the right problem include (1) postpone benchmarking when problems are obvious, (2) define the problem in terms of customer experience so as not to blame employees nor embed a solution in the problem statement, (3) communicate with the rest of the organization from the start, (4) state the problem from different perspectives, and (5) break large problems into smaller units. Suggestions for having rapid meetings include (1) choose a nonparticipating facilitator to expedite meetings, (2) meet with each team member before the team meeting, (3) postpone evaluation of ideas, and (4) rethink conclusions of a meeting before acting on them. Suggestions for rapid planning include reducing time spent on flowcharting by focusing on the future, not the present. Suggestions for rapid data collection include (1) sample patients for surveys, (2) rely on numerical estimates by process owners, and (3) plan for rapid data collection. Suggestions for rapid organizationwide implementation include (1) change membership on cross-functional teams, (2) get outside perspectives, (3) use unfolding storyboards, and (4) go beyond self-interest to motivate lasting change in the organization. Additional empirical investigations of time saved as a consequence of the strategies provided are needed. If organizations solve their problems rapidly, fewer unresolved problems may remain.

  2. OSART Guidelines. 2015 Edition. Reference Report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2016-01-01

    The IAEA works to provide a global nuclear safety and security framework for the protection of people and the environment from the effects of ionizing radiation, the minimization of the likelihood of accidents that could endanger life and property, and effective mitigation of the effects of any such events, should they occur. The strategic approach to achieving such a framework involves continual improvement in four areas: national and international safety infrastructures; the establishment and global acceptance of IAEA safety standards; an integrated approach to the provision for the application of the safety standards; and a global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. Conservative design, careful manufacture and sound construction are all prerequisites for the safe operation of nuclear power plants. However, the safety of the plant also depends ultimately on: sound management, policies, procedures, processes and practices; the capability and reliability of commissioning and operating personnel; comprehensive instructions; sound accident management and emergency preparedness; and adequate resources. Finally, a positive attitude and conscientiousness on the part of all staff in discharging their responsibilities is important to safety. The OSART programme is based on the safety standards applicable to nuclear power plants. IAEA safety standards reflect the consensus of Member States on nuclear safety matters. The reports of the International Nuclear Safety Group identify important current nuclear safety issues and also serve as references during an OSART review. The publication OSART Guidelines provides overall guidance on the conduct of OSART

  3. The impact of brief team communication, leadership and team behavior training on ad hoc team performance in trauma care settings.

    Science.gov (United States)

    Roberts, Nicole K; Williams, Reed G; Schwind, Cathy J; Sutyak, John A; McDowell, Christopher; Griffen, David; Wall, Jarrod; Sanfey, Hilary; Chestnut, Audra; Meier, Andreas H; Wohltmann, Christopher; Clark, Ted R; Wetter, Nathan

    2014-02-01

    Communication breakdowns and care coordination problems often cause preventable adverse patient care events, which can be especially acute in the trauma setting, in which ad hoc teams have little time for advanced planning. Existing teamwork curricula do not address the particular issues associated with ad hoc emergency teams providing trauma care. Ad hoc trauma teams completed a preinstruction simulated trauma encounter and were provided with instruction on appropriate team behaviors and team communication. Teams completed a postinstruction simulated trauma encounter immediately afterward and 3 weeks later, then completed a questionnaire. Blinded raters rated videotapes of the simulations. Participants expressed high levels of satisfaction and intent to change practice after the intervention. Participants changed teamwork and communication behavior on the posttest, and changes were sustained after a 3-week interval, though there was some loss of retention. Brief training exercises can change teamwork and communication behaviors on ad hoc trauma teams. Copyright © 2014 Elsevier Inc. All rights reserved.

  4. Web Application Software for Ground Operations Planning Database (GOPDb) Management

    Science.gov (United States)

    Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey

    2013-01-01

    A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

  5. Distributed Operations Planning

    Science.gov (United States)

    Fox, Jason; Norris, Jeffrey; Powell, Mark; Rabe, Kenneth; Shams, Khawaja

    2007-01-01

    Maestro software provides a secure and distributed mission planning system for long-term missions in general, and the Mars Exploration Rover Mission (MER) specifically. Maestro, the successor to the Science Activity Planner, has a heavy emphasis on portability and distributed operations, and requires no data replication or expensive hardware, instead relying on a set of services functioning on JPL institutional servers. Maestro works on most current computers with network connections, including laptops. When browsing down-link data from a spacecraft, Maestro functions similarly to being on a Web browser. After authenticating the user, it connects to a database server to query an index of data products. It then contacts a Web server to download and display the actual data products. The software also includes collaboration support based upon a highly reliable messaging system. Modifications made to targets in one instance are quickly and securely transmitted to other instances of Maestro. The back end that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

  6. Science Planning Implementation and Challenges for the ExoMars Trace Gas Orbiter

    Science.gov (United States)

    Ashman, Mike; Cardesin Moinelo, Alejandro; Frew, David; Garcia Beteta, Juan Jose; Geiger, Bernhard; Metcalfe, Leo; Muñoz, Michela; Nespoli, Federico

    2018-05-01

    The ExoMars Science Operations Centre (SOC) is located at ESA's European Space Astronomy Centre (ESAC) in Madrid, Spain and is responsible for coordinating the science planning activities for TGO in order to optimize the scientific return of the mission. The SOC constructs, in accordance with Science Working Team (SWT) science priorities, and in coordination with the PI science teams and ESA's Mission Operations Centre (MOC), a plan of scientific observations and delivers conflict free operational products for uplink and execution on-board. To achieve this, the SOC employs a planning concept based on Long, Medium and Short Term planning cycles. Long Term planning covers mission segments of several months and is conducted many months prior to execution. Its goal is to establish a feasible science observation strategy given the science priorities and the expected mission profile. Medium Term planning covers a 1 month mission segment and is conducted from 3 to 2 months prior to execution whilst Short Term planning covers a 1 week segment and is conducted from 2 weeks to 1 week prior to execution. The goals of Medium and Short Term planning are to operationally instantiate and validate the Long Term plan such that the SOC may deliver to MOC a conflict free spacecraft pointing profile request (a Medium Term planning deliverable), and the final instrument telecommanding products (a Short Term planning deliverable) such that the science plan is achieved and all operational constraints are met. With a 2 hour-400km science orbit, the vast number of solar occultation, nadir measurement, and surface imaging opportunities, combined with additional mission constraints such as the necessary provision of TGO communication slots to support the ExoMars 2020 Rover & Surface Platform mission and NASA surface assets, creates a science planning task of considerable magnitude and complexity. In this paper, we detail how the SOC is developing and implementing the necessary planning

  7. Pacific Northwest National Laboratory’s Climate Resiliency Planning Process and Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Fowler, Kimberly M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Judd, Kathleen S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Brandenberger, Jill M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-02-22

    In 2015, the Pacific Northwest National Laboratory (PNNL) developed its first Climate Resilience Plan for its Richland Campus. PNNL has performed Climate Resilience Planning for the Department of Defense, Nuclear Regulatory Commission, and Department of Energy (DOE) over the past 5 years. The assessment team included climate scientists, social scientists, engineers, and operations managers. A multi-disciplinary team was needed to understand the potential exposures to future changes at the site, the state of the science on future impacts, and the best process for “mainstreaming” new actions into existing activities. The team uncovered that the site’s greatest vulnerabilities, and therefore priorities for climate resilience planning, are high temperature due to degraded infrastructure, increased wildfire frequency, and intense precipitation impacts on stormwater conveyance systems.

  8. Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

    Science.gov (United States)

    Dunbar, J. C.

    1972-01-01

    The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

  9. Study on the Development of Methodology for Cost Calculations and Financial Planning of Decommissioning Operations

    International Nuclear Information System (INIS)

    2001-12-01

    The following study deals with the development of methodology for cost calculations and financial planning of decommissioning operations. It has been carried out by EDF / FRAMATOME / VUJE / SCK-CEN in the frame of the contract B7-032/2000/291058/MAR/C2 awarded by the European Commission. This study consists of 4 parts. The first task objective is to develop a reliable and transparent methodology for cost assessment and financial planning sufficient precise but without long and in depth investigations and studies. This methodology mainly contains: Calculation methods and algorithms for the elaboration of costs items making up the whole decommissioning cost. Estimated or standard values for the parameters and for the cost factors to be used in the above-mentioned algorithms Financial mechanism to be applied as to establish a financial planning. The second part task is the provision of standard values for the different parameters and costs factors described in the above-mentioned algorithms. This provision of data is based on the own various experience acquired by the members of the working team and on existing international references (databases, publications and reports). As decommissioning operations are spreading over several dozens of years, the scope of this task the description of the financial mechanisms to be applied to the different cost items as to establish a complete financial cost. It takes into account the financial schedule issued in task 1. The scope of this task consists in bringing together in a guideline all the information collected before: algorithms, data and financial mechanisms. (A.L.B.)

  10. 36 CFR 228.4 - Plan of operations-notice of intent-requirements.

    Science.gov (United States)

    2010-07-01

    ... meet the requirements for environmental protection in § 228.8. (d) The plan of operations shall cover... disturbance not covered by the initial plan. (e) At any time during operations under an approved plan of...), resulting in varying degrees of disturbance to vegetative resources, soil, water, air, or wildlife. The...

  11. The Benefits of Team Teaching.

    Science.gov (United States)

    Morganti, Deena J.; Buckalew, Flora C.

    1991-01-01

    Discussion of team teaching focuses on librarians team teaching a course on information search strategy at the Pennsylvania State Berks Campus Library. Course requirements are described, planning for the course is discussed, grading practices are reviewed, and course and instructor evaluations are described. (two references) (LRW)

  12. Development of a quantitative evaluation method for non-technical skills preparedness of operation teams in nuclear power plants to deal with emergency conditions

    International Nuclear Information System (INIS)

    Yim, Ho Bin; Kim, Ar Ryum; Seong, Poong Hyun

    2013-01-01

    Highlights: ► We selected important non-technical skills for emergency conditions in NPPs. ► We proposed an evaluation method for the selected non-technical skills. ► We conducted two sets of training, 9 experiments each, with real plant operators. ► Teams showed consistent non-technical skills preparedness with changing scenarios. ► Non-technical skills preparedness gives plausible explanations why teams fail tasks. -- Abstract: Many statistical results from safety reports tell that human related errors are the dominant influencing factor on the safe operation of power plants. Fortunately, training operators for the technical and non-technical skills can prevent many types of human errors. In this study, four important non-technical skills in safety critical industries – medical, aviation, and nuclear – were selected to describe behaviors of operation teams in emergency conditions of nuclear power plants (NPPs): communication, leadership, situation awareness, and decision-making skills. Also, preparedness of the non-technical skills was defined, and a quantification method of those skills called NoT-SkiP (Non-Technical Skills Preparedness) was developed to represent ‘how well operation teams are prepared to deal with emergency conditions’ in the non-technical skills aspect by analyzing monitoring-control patterns and a verbal protocol. Two case studies were conducted to validate the method. The first case was applied to Loss of Coolant Accident (LOCA) and Steam Generator Tube Rupture (SGTR) training. Independent variables were scenario, training repetition, and members. Relative values of the NoT-SkiP showed a consistent trend with changing scenarios. However, when training was repeated with the same scenario, NoT-SkiP values of some team were changed. It was supposed that leaders of some teams exerted their knowledge acquired from the previous training and gave up thoroughness of using procedures. When members especially who play a dominant role

  13. Development of a quantitative evaluation method for non-technical skills preparedness of operation teams in nuclear power plants to deal with emergency conditions

    Energy Technology Data Exchange (ETDEWEB)

    Yim, Ho Bin; Kim, Ar Ryum [Department of Nuclear and Quantum Engineering, Korea Advanced Institute of Science and Technology, 373-1, Guseong-dong, Yuseong-gu, Daejeon 305-701 (Korea, Republic of); Seong, Poong Hyun, E-mail: phseong@kaist.ac.kr [Department of Nuclear and Quantum Engineering, Korea Advanced Institute of Science and Technology, 373-1, Guseong-dong, Yuseong-gu, Daejeon 305-701 (Korea, Republic of)

    2013-02-15

    Highlights: ► We selected important non-technical skills for emergency conditions in NPPs. ► We proposed an evaluation method for the selected non-technical skills. ► We conducted two sets of training, 9 experiments each, with real plant operators. ► Teams showed consistent non-technical skills preparedness with changing scenarios. ► Non-technical skills preparedness gives plausible explanations why teams fail tasks. -- Abstract: Many statistical results from safety reports tell that human related errors are the dominant influencing factor on the safe operation of power plants. Fortunately, training operators for the technical and non-technical skills can prevent many types of human errors. In this study, four important non-technical skills in safety critical industries – medical, aviation, and nuclear – were selected to describe behaviors of operation teams in emergency conditions of nuclear power plants (NPPs): communication, leadership, situation awareness, and decision-making skills. Also, preparedness of the non-technical skills was defined, and a quantification method of those skills called NoT-SkiP (Non-Technical Skills Preparedness) was developed to represent ‘how well operation teams are prepared to deal with emergency conditions’ in the non-technical skills aspect by analyzing monitoring-control patterns and a verbal protocol. Two case studies were conducted to validate the method. The first case was applied to Loss of Coolant Accident (LOCA) and Steam Generator Tube Rupture (SGTR) training. Independent variables were scenario, training repetition, and members. Relative values of the NoT-SkiP showed a consistent trend with changing scenarios. However, when training was repeated with the same scenario, NoT-SkiP values of some team were changed. It was supposed that leaders of some teams exerted their knowledge acquired from the previous training and gave up thoroughness of using procedures. When members especially who play a dominant role

  14. Tracking the Short Term Planning (STP) Development Process

    Science.gov (United States)

    Price, Melanie; Moore, Alexander

    2010-01-01

    Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

  15. Electric Vehicle Sharing Planning and Operations

    Science.gov (United States)

    2018-02-01

    Dongfang Zhao (ORCID ID 0000-0002-5424-9915); Xiaopeng (Shaw) Li (ORCID ID 0000-0002-5264-3775); Yu Zhang (ORCID ID 0000-0003-1202-626X) This project includes literature review and proposing a model for EV planning and operations. We first conducted ...

  16. C-Division annual review and operating plan, August 1990

    Energy Technology Data Exchange (ETDEWEB)

    Morse, N.R.

    1990-11-01

    The Computing and Communications Division is responsible for the Laboratory's Integrated Computing Network as well as Laboratory-wide communications. Our computing network, used by 8000 people distributed throughout the nation, constitutes one of the most powerful scientific computing facilities in the world. The purpose of this publication is to inform our clients of our strategic and operating plans. We review major accomplishments since early 1989 and describe our strategic planning goals and specific projects that will guide our operations over the next couple of years. Our mission statement, planning considerations, and management policies and practices are also included.

  17. 30 CFR 250.111 - Who oversees operations under my welding plan?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Who oversees operations under my welding plan... § 250.111 Who oversees operations under my welding plan? A welding supervisor or a designated person in charge must be thoroughly familiar with your welding plan. This person must ensure that each welder is...

  18. Benefits to blood banks of a sales and operations planning process.

    Science.gov (United States)

    Keal, Donald A; Hebert, Phil

    2010-12-01

    A formal sales and operations planning (S&OP) process is a decision making and communication process that balances supply and demand while integrating all business operational components with customer-focused business plans that links high level strategic plans to day-to-day operations. Furthermore, S&OP can assist in managing change across the organization as it provides the opportunity to be proactive in the face of problems and opportunities while establishing a plan for everyone to follow. Some of the key outcomes from a robust S&OP process in blood banking would include: higher customer satisfaction (donors and health care providers), balanced inventory across product lines and customers, more stable production rates and higher productivity, more cooperation across the entire operation, and timely updates to the business plan resulting in better forecasting and fewer surprises that negatively impact the bottom line. © 2010 American Association of Blood Banks.

  19. Desert RATS 2011: Near-Earth Asteroid Human Exploration Operations

    Science.gov (United States)

    Abercromby, Andrew; Gernhardt, Michael L.; Chappel, Steve

    2012-01-01

    The Desert Research and Technology Studies (D-RATS) 2011 field test involved the planning and execution of a series of exploration scenarios under operational conditions similar to those that would be expected during a human exploration mission to a near-Earth asteroid (NEA). The focus was on understanding the operations tempo during simulated NEA exploration and the implications of communications latency and limited data bandwidth. Anchoring technologies and sampling techniques were not evaluated due to the immaturity of those technologies and the inability to meaningfully test them at D-RATS. Reduced gravity analogs and simulations are being used to fully evaluate Multi-Mission Space Exploration Vehicle (MMSEV) and extravehicular (EVA) operations and interactions in near-weightlessness at a NEA as part of NASA s integrated analogs program. Hypotheses were tested by planning and performing a series of 1-day simulated exploration excursions comparing test conditions all of which involved a single Deep Space Habitat (DSH) and either zero, one, or two MMSEVs; three or four crewmembers; one of two different communications bandwidths; and a 100-second roundtrip communications latency between the field site and Houston. Excursions were executed at the Black Point Lava Flow test site with a Mission Control Center and Science Support Room at Johnson Space Center (JSC) being operated with 100-second roundtrip communication latency to the field. Crews were composed of astronauts and professional field geologists and teams of Mission Operations, Science, and Education & Public Outreach (EPO) experts also supported the mission simulations each day. Data were collected separately from the Crew, Mission Operations, Science, and EPO teams to assess the test conditions from multiple perspectives. For the operations tested, data indicates practically significant benefits may be realized by including at least one MMSEV and by including 4 versus 3 crewmembers in the NEA exploration

  20. A systems perspective of managing error recovery and tactical re-planning of operating teams in safety critical domains.

    Science.gov (United States)

    Kontogiannis, Tom

    2011-04-01

    Research in human error has provided useful tools for designing procedures, training, and intelligent interfaces that trap errors at an early stage. However, this "error prevention" policy may not be entirely successful because human errors will inevitably occur. This requires that the error management process (e.g., detection, diagnosis and correction) must also be supported. Research has focused almost exclusively on error detection; little is known about error recovery, especially in the context of safety critical systems. The aim of this paper is to develop a research framework that integrates error recovery strategies employed by experienced practitioners in handling their own errors. A control theoretic model of human performance was used to integrate error recovery strategies assembled from reviews of the literature, analyses of near misses from aviation and command & control domains, and observations of abnormal situations training at air traffic control facilities. The method of system dynamics has been used to analyze and compare error recovery strategies in terms of patterns of interaction, system affordances, and types of recovery plans. System dynamics offer a promising basis for studying the nature of error recovery management in the context of team interactions and system characteristics. The proposed taxonomy of error recovery strategies can help human factors and safety experts to develop resilient system designs and training solutions for managing human errors in unforeseen situations; it may also help incident investigators to explore why people's actions and assessments were not corrected at the time. Copyright © 2011 Elsevier Ltd. All rights reserved.

  1. Spaceport Florida Authority: Business Plan

    Science.gov (United States)

    1996-01-01

    The Spaceport Florida Authority (SFA) was established under Florida Statute by the Governor and Legislature to assist the development of our nation's space transportation industry and to generate new space-related jobs, investment and opportunities statewide. Included in the Authorities' business plan is the statement of work and list of team members involved in creating the report, SFA's current operating concept, market analysis, assessment of accomplishments, a sample operating concept and a "roadmap to success".

  2. Using model based systems engineering for the development of the Large Synoptic Survey Telescope's operational plan

    Science.gov (United States)

    Selvy, Brian M.; Claver, Charles; Willman, Beth; Petravick, Don; Johnson, Margaret; Reil, Kevin; Marshall, Stuart; Thomas, Sandrine; Lotz, Paul; Schumacher, German; Lim, Kian-Tat; Jenness, Tim; Jacoby, Suzanne; Emmons, Ben; Axelrod, Tim

    2016-08-01

    We† provide an overview of the Model Based Systems Engineering (MBSE) language, tool, and methodology being used in our development of the Operational Plan for Large Synoptic Survey Telescope (LSST) operations. LSST's Systems Engineering (SE) team is using a model-based approach to operational plan development to: 1) capture the topdown stakeholders' needs and functional allocations defining the scope, required tasks, and personnel needed for operations, and 2) capture the bottom-up operations and maintenance activities required to conduct the LSST survey across its distributed operations sites for the full ten year survey duration. To accomplish these complimentary goals and ensure that they result in self-consistent results, we have developed a holistic approach using the Sparx Enterprise Architect modeling tool and Systems Modeling Language (SysML). This approach utilizes SysML Use Cases, Actors, associated relationships, and Activity Diagrams to document and refine all of the major operations and maintenance activities that will be required to successfully operate the observatory and meet stakeholder expectations. We have developed several customized extensions of the SysML language including the creation of a custom stereotyped Use Case element with unique tagged values, as well as unique association connectors and Actor stereotypes. We demonstrate this customized MBSE methodology enables us to define: 1) the rolls each human Actor must take on to successfully carry out the activities associated with the Use Cases; 2) the skills each Actor must possess; 3) the functional allocation of all required stakeholder activities and Use Cases to organizational entities tasked with carrying them out; and 4) the organization structure required to successfully execute the operational survey. Our approach allows for continual refinement utilizing the systems engineering spiral method to expose finer levels of detail as necessary. For example, the bottom-up, Use Case

  3. Lead time anticipation in supply chain operations planning

    NARCIS (Netherlands)

    Jansen, M.M.; Kok, de A.G.; Fransoo, J.C.

    2013-01-01

    Linear programming (LP) models for Supply Chain Operations Planning are widely used in Advanced Planning Systems. The solution to the LP model is a proposal for order releases to the various production units (PU) in the supply network. There is a non-linear relationship between the work-in-process

  4. Training van crisismanagement-teams [Training of emergency management teams

    NARCIS (Netherlands)

    Berlo, M.P.W. van; Stroomer, S.; Bosch, K. van den

    2003-01-01

    Een rampenplan of bedrijfsnoodplan bestaat veelal slechts uit een lijst met telefoonnummers, of het is een plan dat niet is geactualiseerd. Bovendien is het trainen van crisismanagement-teams lastig omdat crises vaak een onvoorspelbaar karakter hebben. in deze bijdrage worden twee methoden

  5. Task and Motion Planning for Selective Weed Conrol using a Team of Autonomous Vehicles

    DEFF Research Database (Denmark)

    Hameed, Ibrahim; la Cour-Harbo, Anders; Hansen, Karl Damkjær

    2014-01-01

    with the right amount. In this article, a task and motion planning for a team of autonomous vehicles to reduce chemicals in farming is presented. Field data are collected by small unmanned helicopters equipped with a range of sensors, including multispectral and thermal cameras. Data collected are transmitted...... to a ground station to be analyzed and triggers aerial and ground-based vehicles to start close inspection and/or plant/weed treatment in specified areas. A complete trajectory is generated to enable ground-based vehicle to visit infested areas and start chemical/mechanical weed treatment....

  6. Use of sales and operations planning in small and medium-sized enterprises

    Directory of Open Access Journals (Sweden)

    Michał Adamczak

    2013-03-01

    Full Text Available Background: Increasing competitiveness in the market, customer expectations related to the shortening of the deadlines and the reduction of prices of products and services force companies to improve the efficiency of internal processes. The integration of planning process is one of possible ways to achieve this aim. The integration of planning processes by the use of SOP model (Sales and Operations Planning is a method to implement this idea. The study allowed to identify ways to implement the process of sales and operations planning in small and medium-sized enterprises. Material and methods: The study was conducted in companies from different industries. The research method was in-depth interviews conducted with managers of companies or persons occupying management positions in the organizational process of implementing sales and operations planning. Results: During the survey, 10 companies were asked about the use of sales and operations planning, its elements and organizational aspects of its development, by the company. Conclusions: The use of sales and operations plan is closely dependent on the size of the company and its localization in the supply chain. Small enterprises are not interested in the integration of the planning process due to the small scale of operations and the centralization of decision-making process. Medium-sized enterprises, due to the increased complexity of the processes of planning, see the benefits of their integration in the SOP model.

  7. [Philanthropic hospitals and the operation of provider-owned health plans in Brazil].

    Science.gov (United States)

    Lima, Sheyla Maria Lemos; Portela, Margareth C; Ugá, Maria Alicia Dominguez; Barbosa, Pedro Ribeiro; Gerschman, Silvia; Vasconcellos, Miguel Murat

    2007-02-01

    To describe the management performance of philanthropic hospitals that operate their own health plans, in comparison with philanthropic hospitals as a whole in Brazil. The managerial structures of philanthropic hospitals that operated their own health plans were compared with those seen in a representative group from the philanthropic hospital sector, in six dimensions: management and planning, economics and finance, human resources, technical services, logistics services and information technology. Data from a random sample of 69 hospitals within the philanthropic hospital sector and 94 philanthropic hospitals that operate their own health plans were evaluated. In both cases, only the hospitals with less than 599 beds were included. The results identified for the hospitals that operate their own health plans were more positive in all the managerial dimensions compared. In particular, the economics and finance and information technology dimensions were highlighted, for which more than 50% of the hospitals that operated their own health plans presented almost all the conditions considered. The philanthropic hospital sector is important in providing services to the Brazilian Health System (SUS). The challenges in maintaining and developing these hospitals impose the need to find alternatives. Stimulation of a public-private partnership in this segment, by means of operating provider-owned health plans or providing services to other health plans that work together with SUS, is a field that deserves more in-depth analysis.

  8. The use of virtual reality and intelligent database systems for procedure planning, visualisation, and real-time component tracking in remote handling operations

    International Nuclear Information System (INIS)

    Robbins, Edward; Sanders, Stephen; Williams, Adrian; Allan, Peter

    2009-01-01

    The organisation of remote handling (RH) operations in fusion environments is increasingly critical as the number of tasks, components and tooling that RH operations teams must deal with inexorably rises. During the recent JET EP1 RH shutdown the existing virtual reality (VR) and procedural database systems proved essential for visualisation and tracking of operations, particularly due to the increasing complexity of remote tasks. A new task planning system for RH operations is in development, and is expected to be ready for use during the next major shutdown, planned for 2009. The system will make use of information available from the remote operations procedures, the RH equipment human-machine interfaces, the on-line RH equipment control systems and also the virtual reality (VR) system to establish a complete database for the location of plant items and RH equipment as RH operations progress. It is intended that the system be used during both preparation and implementation of shutdowns. In the preparations phase the system can be used to validate procedures and overall logistics by allowing an operator to increment through each operation step and to use the VR system to visualise the location and status of all components, manipulators and RH tools. During task development the RH operations engineers can plan and visualise movement of components and tooling to examine handling concepts and establish storage requirements. In the implementation of operations the daily work schedules information will be integrated with the RH operations procedures tracking records to enable the VR system to provide a visual representation of the status of remote operations in real time. Monitoring of the usage history of items will allow estimates of radiation dosage and contaminant exposure to be made. This paper describes the overall aims, structure and use of the system, discusses its application to JET and also considers potential future developments.

  9. Cooperative Robot Teams Applied to the Site Preparation Task

    International Nuclear Information System (INIS)

    Parker, LE

    2001-01-01

    Prior to human missions to Mars, infrastructures on Mars that support human survival must be prepared. robotic teams can assist in these advance preparations in a number of ways. This paper addresses one of these advance robotic team tasks--the site preparation task--by proposing a control structure that allows robot teams to cooperatively solve this aspect of infrastructure preparation. A key question in this context is determining how robots should make decisions on which aspect of the site preparation t6ask to address throughout the mission, especially while operating in rough terrains. This paper describes a control approach to solving this problem that is based upon the ALLIANCE architecture, combined with performance-based rough terrain navigation that addresses path planning and control of mobile robots in rough terrain environments. They present the site preparation task and the proposed cooperative control approach, followed by some of the results of the initial testing of various aspects of the system

  10. A Practice of Secure Development and Operational Environment Plan

    International Nuclear Information System (INIS)

    Park, Jaekwan; Seo, Sangmun; Suh, Yongsukl; Park, Cheol

    2017-01-01

    This paper suggests a practice of plan for SDOE establishment in a nuclear I and C. First, it is necessary to perform a requirements analysis to define key regulatory issues and determine the target systems. The analysis includes a survey to find out the applicable measures credited internationally. Based on the analysis results, this paper proposes an implementation plan including a process harmonizing security activities with legacy software activities and applicable technical, operational, and management measures for target systems. Recently, nuclear I and C has been faced with two security issues, cyber security (CS) and secure development and operational environment (SDOE). Unlike cyber security, few studies on planning SDOE have been presented. This paper suggests a plan for establishing an SDOE in a nuclear I and C. This paper defines three key considerations to comply with the regulatory position of RG. 1.152(R3) and proposes a process harmonizing the security activities with legacy software activities. In addition, this paper proposes technical, operational, and management measures applicable for SDOE.

  11. Operations Research Applications in Audit Planning and Scheduling

    OpenAIRE

    Abdel-Aziz M. Mohamed

    2015-01-01

    This paper presents a state-of-the-art survey of the operations research models developed for internal audit planning. Two alternative approaches have been followed in the literature for audit planning: (1) identifying the optimal audit frequency; and (2) determining the optimal audit resource allocation. The first approach identifies the elapsed time between two successive audits, which can be presented as the optimal number of audits in a given planning horizon, or the ...

  12. Interactive orbital proximity operations planning system instruction and training guide

    Science.gov (United States)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1994-01-01

    This guide instructs users in the operation of a Proximity Operations Planning System. This system uses an interactive graphical method for planning fuel-efficient rendezvous trajectories in the multi-spacecraft environment of the space station and allows the operator to compose a multi-burn transfer trajectory between orbit initial chaser and target trajectories. The available task time (window) of the mission is predetermined and the maneuver is subject to various operational constraints, such as departure, arrival, spatial, plume impingement, and en route passage constraints. The maneuvers are described in terms of the relative motion experienced in a space station centered coordinate system. Both in-orbital plane as well as out-of-orbital plane maneuvering is considered. A number of visual optimization aids are used for assisting the operator in reaching fuel-efficient solutions. These optimization aids are based on the Primer Vector theory. The visual feedback of trajectory shapes, operational constraints, and optimization functions, provided by user-transparent and continuously active background computations, allows the operator to make fast, iterative design changes that rapidly converge to fuel-efficient solutions. The planning tool is an example of operator-assisted optimization of nonlinear cost functions.

  13. Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program

    Science.gov (United States)

    Johnstone, Paul M.; Blomberg, Richard D.; Gleghorn, George J.; Krone, Norris J.; Voltz, Richard A.; Dunn, Robert F.; Donlan, Charles J.; Kauderer, Bernard M.; Brill, Yvonne C.; Englar, Kenneth G.; hide

    1996-01-01

    At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.

  14. GIS Methodology for Planning Planetary-Rover Operations

    Science.gov (United States)

    Powell, Mark; Norris, Jeffrey; Fox, Jason; Rabe, Kenneth; Shu, I-Hsiang

    2007-01-01

    A document describes a methodology for utilizing image data downlinked from cameras aboard a robotic ground vehicle (rover) on a remote planet for analyzing and planning operations of the vehicle and of any associated spacecraft. Traditionally, the cataloging and presentation of large numbers of downlinked planetary-exploration images have been done by use of two organizational methods: temporal organization and correlation between activity plans and images. In contrast, the present methodology involves spatial indexing of image data by use of the computational discipline of geographic information systems (GIS), which has been maturing in terrestrial applications for decades, but, until now, has not been widely used in support of exploration of remote planets. The use of GIS to catalog data products for analysis is intended to increase efficiency and effectiveness in planning rover operations, just as GIS has proven to be a source of powerful computational tools in such terrestrial endeavors as law enforcement, military strategic planning, surveying, political science, and epidemiology. The use of GIS also satisfies the need for a map-based user interface that is intuitive to rover-activity planners, many of whom are deeply familiar with maps and know how to use them effectively in field geology.

  15. Top management team heterogeneity, strategic change and operational performance

    NARCIS (Netherlands)

    Naranjo Gil, D.; Hartmann, F.; Maas, V.S.

    2008-01-01

    This study examines the role of top management team (TMT) heterogeneity in facilitating strategic change. Based on the upper echelons literature, we argue that heterogeneous management teams are better able to handle the simultaneous and conflicting demands of refocusing the organization

  16. Optimal dimensioning of low-energy district heating networks with operational planning

    DEFF Research Database (Denmark)

    Tol, Hakan; Svendsen, Svend

    2012-01-01

    in design stage resulted in satisfaction of heat demand of the house in low temperature operation. In this paper the operational planning of the low-energy DH systems was investigated to reduce the dimensions of the distribution network with consideration given both to current high-heat and future low......-heat demand situations. The operational planning was based on boosting (increasing) the supply temperature at peak-demand situations which occur rarely over a year period. Hence optimal pipe dimensions of low-energy DH systems were investigated based on the dynamic response of in-house heating systems...... of operational planning in comparison to DH network dimensioned according to high heat demand situation....

  17. A Revenue Planning Tool for Charter School Operators

    Science.gov (United States)

    Keller, Eric; Hayes, Cheryl D.

    2009-01-01

    This revenue planning tool aims to help charter school operators develop a sound revenue base that can meet their school's current and future funding needs. It helps identify and assess potential public (federal, state, and local) and private funding sources. The tool incorporates a four-step revenue planning process which includes: (1)…

  18. The Aggregate Planning For Trucking Operation in Cikarang Dry Port

    Directory of Open Access Journals (Sweden)

    Dwi Puspita Sari Utami

    2015-06-01

    Full Text Available Abstract. Cikarang Dry Port currently is the only dry port in Indonesia. This Dry Port has a role to connect or extend the Sea Port to the industrial areas located far from Sea Port. Thus, it creates a value added and also reduce costs. One of the operations done in Cikarang Dry Port is trucking operation. This research aims to examine the planning of 2014 trucking activity in Cikarang Dry Port to determine the right number of the truck that will be best occupied to manage all demands. The analysis begins with demand forecasting by using a moving average method of 12 months or one year period in 2013 which will be used as main information to develop the plans. There are three plans developed in this research. Based on the three plans, Plan A with minimum trucking plan with subcontracting is the most profitable which gives the highest profitability of Rp. 374,984,625. Recommendation for this research is using the current minimum number of 39 trucks rent with additional subcontracting when the demand is exceeding the capacity, thus, Cikarang Dry Port can occupy all demands and gain more profits. Keywords: Aggregate Planning; Scheduling; Trucking Operation; Moving Average; Cikarang Dry Port

  19. The Aggregate Planning For Trucking Operation in Cikarang Dry Port

    Directory of Open Access Journals (Sweden)

    Dwi Puspita Sari Utami

    2015-07-01

    Full Text Available Abstract. Cikarang Dry Port currently is the only dry port in Indonesia. This Dry Port has a role to connect or extend the Sea Port to the industrial areas located far from Sea Port. Thus, it creates a value added and also reduce costs. One of the operations done in Cikarang Dry Port is trucking operation. This research aims to examine the planning of 2014 trucking activity in Cikarang Dry Port to determine the right number of the truck that will be best occupied to manage all demands. The analysis begins with demand forecasting by using a moving average method of 12 months or one year period in 2013 which will be used as main information to develop the plans. There are three plans developed in this research. Based on the three plans, Plan A with minimum trucking plan with subcontracting is the most profitable which gives the highest profitability of Rp. 374,984,625. Recommendation for this research is using the current minimum number of 39 trucks rent with additional subcontracting when the demand is exceeding the capacity, thus, Cikarang Dry Port can occupy all demands and gain more profits.Keywords: Aggregate Planning; Scheduling; Trucking Operation; Moving Average; Cikarang Dry Port

  20. Planning for success: desired characteristics of special operations surgeons, a pilot study.

    Science.gov (United States)

    Campbell, Barrett H; Alderman, Shawn M

    2012-01-01

    Selection criteria for Special Operations Forces (SOF) physicians are often unclear to potential candidates without prior SOF experience. To date, no published career resource exists to guide the careers of physicians interested in becoming a SOF surgeon. Using a survey tool, desirable characteristics and personal attributes were identified that can be used to inform candidate career decisions and better prepare them for a future position in Special Operations. A descriptive, cross-sectional survey instrument was developed and distributed to current Army SOF Command Surgeons for further distribution to subordinate surgeons. RESULTS were analyzed as a cohort and by subordinate command. Respondents consisted of current SOF Surgeons. Uniformly, the individual characteristics most strongly desired are professionalism, being a team player, and leadership. Possessing or obtaining Airborne and Flight Surgeon qualifications prior to consideration for a surgeon position was highly desired. Residency training within Family Medicine or Emergency Medicine constituted the vast majority of specialty preference. Understanding which characteristics and attributes are desirable to current surgeons and commanders can aid physicians interested in SOF surgeon positions. Using this study and future studies can guide career planning and foster the selection of ideally trained physicians who will operate at the tip of the spear. The views expressed are those of the author(s) and do not reflect the official policy of the Department of the Army, the Department of Defense or the U.S. Government. 2012.

  1. High-school Student Teams in a National NASA Microgravity Science Competition

    Science.gov (United States)

    DeLombard, Richard; Hodanbosi, Carol; Stocker, Dennis

    2003-01-01

    The Dropping In a Microgravity Environment or DIME competition for high-school-aged student teams has completed the first year for nationwide eligibility after two regional pilot years. With the expanded geographic participation and increased complexity of experiments, new lessons were learned by the DIME staff. A team participating in DIME will research the field of microgravity, develop a hypothesis, and prepare a proposal for an experiment to be conducted in a NASA microgravity drop tower. A team of NASA scientists and engineers will select the top proposals and then the selected teams will design and build their experiment apparatus. When completed, team representatives will visit NASA Glenn in Cleveland, Ohio to operate their experiment in the 2.2 Second Drop Tower and participate in workshops and center tours. NASA participates in a wide variety of educational activities including competitive events. There are competitive events sponsored by NASA (e.g. NASA Student Involvement Program) and student teams mentored by NASA centers (e.g. For Inspiration and Recognition of Science and Technology Robotics Competition). This participation by NASA in these public forums serves to bring the excitement of aerospace science to students and educators.Researchers from academic institutions, NASA, and industry utilize the 2.2 Second Drop Tower at NASA Glenn Research Center in Cleveland, Ohio for microgravity research. The researcher may be able to complete the suite of experiments in the drop tower but many experiments are precursor experiments for spaceflight experiments. The short turnaround time for an experiment's operations (45 minutes) and ready access to experiment carriers makes the facility amenable for use in a student program. The pilot year for DIME was conducted during the 2000-2001 school year with invitations sent out to Ohio- based schools and organizations. A second pilot year was conducted during the 2001-2002 school year for teams in the six-state region

  2. Airborne Data Link Operational Evaluation Test Plan

    Science.gov (United States)

    1993-08-01

    This plan describes an end-to-end study of operational concepts and procedures associated with the introduction of electronic data communications between flight crews and air traffic controllers. Full performance controllers from : terminal facilitie...

  3. A case method for Sales and Operations Planning: a learning experience from Germany

    Directory of Open Access Journals (Sweden)

    Luiz Felipe Scavarda

    Full Text Available Abstract Adequate preparation, learning, and training is required for Sales and Operations Planning (S&OP to aid organizations in achieving the full expected benefits from its implementation. This paper presents a case method for S&OP and the learning experience of its application at the University of Münster (Germany. The “constructive alignment principle” was applied with a “team teaching” approach, involving an executive from the case company. Students improved their knowledge on S&OP and their analytical skills by understanding the conceptual S&OP building blocks and by learning how to deal with them to provide a solution for a case based on a real-life situation. The learning results were evaluated positively during the discipline’s student evaluation of teaching (SET. The applied case method enhanced the student’s motivation and engagement (e.g., higher preparation effort and class attendance, which were considered higher than in other disciplines with the traditional lecture-based education.

  4. 77 FR 24979 - Plan of Operations, Environmental Assessment, Big Thicket National Preserve, Texas

    Science.gov (United States)

    2012-04-26

    ... DEPARTMENT OF THE INTERIOR National Park Service [7148-NZY] Plan of Operations, Environmental.... ACTION: Notice of Availability of a Plan of Operations and Environmental Assessment for a 30-day public... Energy Company (Cimarex), a Plan of Operations to conduct the Rivers Edge 3-D Seismic Survey within the...

  5. STAR Algorithm Integration Team - Facilitating operational algorithm development

    Science.gov (United States)

    Mikles, V. J.

    2015-12-01

    The NOAA/NESDIS Center for Satellite Research and Applications (STAR) provides technical support of the Joint Polar Satellite System (JPSS) algorithm development and integration tasks. Utilizing data from the S-NPP satellite, JPSS generates over thirty Environmental Data Records (EDRs) and Intermediate Products (IPs) spanning atmospheric, ocean, cryosphere, and land weather disciplines. The Algorithm Integration Team (AIT) brings technical expertise and support to product algorithms, specifically in testing and validating science algorithms in a pre-operational environment. The AIT verifies that new and updated algorithms function in the development environment, enforces established software development standards, and ensures that delivered packages are functional and complete. AIT facilitates the development of new JPSS-1 algorithms by implementing a review approach based on the Enterprise Product Lifecycle (EPL) process. Building on relationships established during the S-NPP algorithm development process and coordinating directly with science algorithm developers, the AIT has implemented structured reviews with self-contained document suites. The process has supported algorithm improvements for products such as ozone, active fire, vegetation index, and temperature and moisture profiles.

  6. How Innovation Theory Can Contribute to the Military Operations Planning Process

    DEFF Research Database (Denmark)

    Heltberg, Anna Therese; Dahl, Kåre

    The research study considers how the application of innovation theory might contribute to military staff work planning processes and bring new perspectives to operational models of analysis such as NATO’s Comprehensive Operations Planning Directive (COPD) and the Danish Field Manual III....

  7. IBM PC/IX operating system evaluation plan

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Granier, Martin; Hall, Philip P.; Triantafyllopoulos, Spiros

    1984-01-01

    An evaluation plan for the IBM PC/IX Operating System designed for IBM PC/XT computers is discussed. The evaluation plan covers the areas of performance measurement and evaluation, software facilities available, man-machine interface considerations, networking, and the suitability of PC/IX as a development environment within the University of Southwestern Louisiana NASA PC Research and Development project. In order to compare and evaluate the PC/IX system, comparisons with other available UNIX-based systems are also included.

  8. Operational workforce planning for check-in counters at airports

    DEFF Research Database (Denmark)

    Stolletz, Raik

    2010-01-01

    This paper addresses operation models for workforce planning for check-in systems at airports. We characterize different tasks of the hierarchical workforce planning problem with time-dependent demand. A binary linear programming formulation is developed for the fortnightly tour scheduling problem...

  9. Metering Plan: Intelligent Operational Strategies Through Enhanced Metering Systems

    Energy Technology Data Exchange (ETDEWEB)

    Pope, Jason E.

    2016-07-27

    The Sustainability Program at Pacific Northwest National Laboratory (PNNL) has adopted a “triple-bottom-line” approach of environmental stewardship, social responsibility, and economic prosperity to its operations. Metering at PNNL works in support of all three, specifically to measure and inform building energy use and greenhouse gas emissions and minimize water use. The foundation for metering at PNNL is a core goal set, which consists of four objectives: providing accurate data without interruption, analyzing data while it is still new, providing actionable recommendations to operations management, and ensuring PNNL’s compliance with contract metering requirements. These core objectives guide the decisions that we make during annual planning and as we operate throughout the year. This 2016 edition of the Metering Plan conveys the metering practices for and vision of the Sustainability Program. Changes in this plan from the 2015 edition include updated tables and an enhanced discussion on energy tracking systems used at PNNL. This plan also discusses updated benchmarking strategies using PNNL’s graphics and analytics tool, BuildingOS by Lucid Design Group. This plan presents our progress toward the metering goals shared by all federal agencies and highlights our successful completion of metering requirements. Currently, PNNL is fully compliant with the applicable legislative and Executive Order metering requirements. PNNL’s approach to the installation of new meters will be discussed. Perhaps most importantly, this plan details the analysis techniques utilized at PNNL that rely on the endless streams of data newly available as a result of increased meter deployment over the last several years. Previous Metering Plans have documented specific meter connection schemes as PNNL focused on deploying meters in a first step toward managing energy and water use. This plan serves not only to highlight PNNL’s successful completion of agency metering goals, but

  10. The design of system for operative planning of blast furnace production process

    Directory of Open Access Journals (Sweden)

    Malindžák Dušan

    1996-12-01

    Full Text Available A system for operative planning of blast furnace production process is described in the paper. The suggested system is based on the use of a new hierarchy of operative plans, consisting of one-month plan, (7+3 days plan, and 24-hour plan. The system allows smoothing of production process at the blast furnace plant, and at the same time satisfies all requirements of the steel plant regarding to the amount of pig iron.

  11. Missouri commercial vehicle operations : state business plan

    Science.gov (United States)

    1998-05-15

    This business plan is intended to assist this state in improving its commercial vehicle operation regulation, guide the deployment and installation of intelligent transportation systems and to implement these systems in an efficient and cost effectiv...

  12. Legal protection against outline operating plans under mining law; Rechtsschutz gegen Rahmenbetriebsplaene im Bergrecht

    Energy Technology Data Exchange (ETDEWEB)

    Schmitz, Holger; Mausch, Marlen [Rechtsanwaltskanzlei Noerr LLP, Berlin (Germany)

    2011-03-15

    In the outline planning for a mining project the question of to what extent the interests of potentially affected surface owners must be taken into account at this early stage of project planning regularly arises. In this contribution the authors explain after a brief introduction to the subject the current jurisdiction of the Federal Administrative Court in respect of the corresponding legal requirements on the outline operating plants, the legal effects of the approval of an outline operating plan and the right of the surface owners to contest the operating plan approval. In addition the permissibility of the initial treatment of owner interests in subsequent special operating plans is described. It is evident that the binding effect of the outline operating plans on the one hand and the transfer of owner interests to special operating plans on the other conflict to a certain extent. (orig.)

  13. Joint operations planning for space surveillance missions on the MSX satellite

    Science.gov (United States)

    Stokes, Grant; Good, Andrew

    1994-01-01

    The Midcourse Space Experiment (MSX) satellite, sponsored by BMDO, is intended to gather broad-band phenomenology data on missiles, plumes, naturally occurring earthlimb backgrounds and deep space backgrounds. In addition the MSX will be used to conduct functional demonstrations of space-based space surveillance. The JHU/Applied Physics Laboratory (APL), located in Laurel, MD, is the integrator and operator of the MSX satellite. APL will conduct all operations related to the MSX and is charged with the detailed operations planning required to implement all of the experiments run on the MSX except the space surveillance experiments. The non-surveillance operations are generally amenable to being defined months ahead of time and being scheduled on a monthly basis. Lincoln Laboratory, Massachusetts Institute of Technology (LL), located in Lexington, MA, is the provider of one of the principle MSX instruments, the Space-Based Visible (SBV) sensor, and the agency charged with implementing the space surveillance demonstrations on the MSX. The planning timelines for the space surveillance demonstrations are fundamentally different from those for the other experiments. They are generally amenable to being scheduled on a monthly basis, but the specific experiment sequence and pointing must be refined shortly before execution. This allocation of responsibilities to different organizations implies the need for a joint mission planning system for conducting space surveillance demonstrations. This paper details the iterative, joint planning system, based on passing responsibility for generating MSX commands for surveillance operations from APL to LL for specific scheduled operations. The joint planning system, including the generation of a budget for spacecraft resources to be used for surveillance events, has been successfully demonstrated during ground testing of the MSX and is being validated for MSX launch within the year. The planning system developed for the MSX forms a

  14. Modeling the Office of Science ten year facilities plan: The PERI Architecture Tiger Team

    International Nuclear Information System (INIS)

    Supinski, Bronis R de; Gamblin, Todd; Schulz, Martin

    2009-01-01

    The Performance Engineering Institute (PERI) originally proposed a tiger team activity as a mechanism to target significant effort optimizing key Office of Science applications, a model that was successfully realized with the assistance of two JOULE metric teams. However, the Office of Science requested a new focus beginning in 2008: assistance in forming its ten year facilities plan. To meet this request, PERI formed the Architecture Tiger Team, which is modeling the performance of key science applications on future architectures, with S3D, FLASH and GTC chosen as the first application targets. In this activity, we have measured the performance of these applications on current systems in order to understand their baseline performance and to ensure that our modeling activity focuses on the right versions and inputs of the applications. We have applied a variety of modeling techniques to anticipate the performance of these applications on a range of anticipated systems. While our initial findings predict that Office of Science applications will continue to perform well on future machines from major hardware vendors, we have also encountered several areas in which we must extend our modeling techniques in order to fulfill our mission accurately and completely. In addition, we anticipate that models of a wider range of applications will reveal critical differences between expected future systems, thus providing guidance for future Office of Science procurement decisions, and will enable DOE applications to exploit machines in future facilities fully.

  15. Implications of outsourcing on operations planning : findings from the pharmaceutical industry

    NARCIS (Netherlands)

    Boulaksil, Y.; Fransoo, J.C.

    2010-01-01

    Purpose – The purpose of this paper is to understand the implications of outsourcing at the operational planning level, i.e. how the operational planning function is complicated owing to the strategic outsourcing decisions that have been made in the past. Design/methodology/approach – First, a

  16. UMTS network planning, optimization, and inter-operation with GSM

    CERN Document Server

    Rahnema, Moe

    2008-01-01

    UMTS Network Planning, Optimization, and Inter-Operation with GSM is an accessible, one-stop reference to help engineers effectively reduce the time and costs involved in UMTS deployment and optimization. Rahnema includes detailed coverage from both a theoretical and practical perspective on the planning and optimization aspects of UMTS, and a number of other new techniques to help operators get the most out of their networks. Provides an end-to-end perspective, from network design to optimizationIncorporates the hands-on experiences of numerous researchersSingle

  17. Orbital Express mission operations planning and resource management using ASPEN

    Science.gov (United States)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-04-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less labor-power rises. Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Like a tow-truck delivering gas to a car on the road, the "servicing" satellite of OE had to find the "client" from several kilometers away, connect directly to the client, and transfer fluid (or a battery) autonomously, while on earth-orbit. The mission met 100% of its success criteria, and proved that autonomous satellite servicing is now a reality for space operations. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. As the constraints for execution could change weekly, daily, and even hourly, the tools used create the mission execution plans needed to be flexible and adaptable to many different kinds of changes. At the same time, the hard constraints of the plans needed to be maintained and satisfied. The Automated Scheduling and Planning Environment (ASPEN) tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, an overview of the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the NASA's Earth Observing One mission's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  18. The Traverse Planning Process for the Drats 2010 Analog Field Simulations

    Science.gov (United States)

    Horz, Friedrich; Gruener, John; Lofgren, Gary; Skinner, James A., Jr.; Graf, Jodi; Seibert, Marc

    2011-01-01

    Traverse planning concentrates on optimizing the science return within the overall objectives of planetary surface missions or their analog field simulations. Such simulations were conducted in the San Francisco Volcanic Field, northern Arizona, from Aug. 26 to Sept 17, 2010 and involved some 200 individuals in the field, with some 40 geoscientists composing the science team. The purpose of these Desert Research and Technology Studies (DRATS) is to exercise and evaluate developmental hardware, software and operational concepts in a mission-like, fully-integrated, setting under the direction of an onsite Mobile Mission Control Center(MMCC). DRATS 2010 focused on the simultaneous operation of 2 rovers, a historic first. Each vehicle was manned by an astronaut-commander and an experienced field geologist. Having 2 rovers and crews in the field mandated substantially more complex science and mission control operations compared to the single rover DRATS tests of 2008 and 2009, or the Apollo lunar missions. For instance, the science support function was distributed over 2 "back rooms", one for each rover, with both "tactical" teams operating independently and simultaneously during the actual traverses. Synthesis and integration of the daily findings and forward planning for the next day(s) was accomplished overnight by yet another "strategic" science team.

  19. COMPARISON OF TWO METHODS OF OPERATING THEATRE PLANNING: APPLICATION IN BELGIAN HOSPITAL

    Institute of Scientific and Technical Information of China (English)

    Sondes CHAABANE; Nadine MESKENS; Alain GUINET; Marius LAURENT

    2008-01-01

    Operating Theatre is the centre of the hospital management's efforts. It constitutes the most expensive sector with more than 10% of the intended operating budget of the hospital. To reduce the costs while maintaining a good quality of care, one of the solutions is to improve the existent planning and scheduling methods by improving the services and surgical specialty coordination or finding the best estimation of surgical case durations. The other solution is to construct an effective surgical case plan and schedule. The operating theatre planning and scheduling is the two important steps, which aim to make a surgical case programming with an objective of obtaining a realizable and efficient surgical case schedule. This paper focuses on the first step, the operating theatre planning problem. Two planning methods are introduced and compared. Real data of a Belgian university hospital "Tivoli" are used for the experiments.

  20. [Developing team reflexivity as a learning and working tool for medical teams].

    Science.gov (United States)

    Riskin, Arieh; Bamberger, Peter

    2014-01-01

    Team reflexivity is a collective activity in which team members review their previous work, and develop ideas on how to modify their work behavior in order to achieve better future results. It is an important learning tool and a key factor in explaining the varying effectiveness of teams. Team reflexivity encompasses both self-awareness and agency, and includes three main activities: reflection, planning, and adaptation. The model of briefing-debriefing cycles promotes team reflexivity. Its key elements include: Pre-action briefing--setting objectives, roles, and strategies the mission, as well as proposing adaptations based on what was previously learnt from similar procedures; Post-action debriefing--reflecting on the procedure performed and reviewing the extent to which objectives were met, and what can be learnt for future tasks. Given the widespread attention to team-based work systems and organizational learning, efforts should be made toward ntroducing team reflexivity in health administration systems. Implementation could be difficult because most teams in hospitals are short-lived action teams formed for a particular event, with limited time and opportunity to consciously reflect upon their actions. But it is precisely in these contexts that reflexive processes have the most to offer instead of the natural impulsive collective logics. Team reflexivity suggests a potential solution to the major problems of iatorgenesis--avoidable medical errors, as it forces all team members to participate in a reflexive process together. Briefing-debriefing technology was studied mainly in surgical teams and was shown to enhance team-based learning and to improve quality-related outcomes and safety.

  1. The relationship of the emotional climate of work and threat to patient outcome in a high-volume thoracic surgery operating room team.

    Science.gov (United States)

    Nurok, Michael; Evans, Linda A; Lipsitz, Stuart; Satwicz, Paul; Kelly, Andrea; Frankel, Allan

    2011-03-01

    It is widely believed that the emotional climate of surgical team's work may affect patient outcome. To analyse the relationship between the emotional climate of work and indices of threat to patient outcome. Interventional study. Operating rooms in a high-volume thoracic surgery centre from September 2007 to June 2008. Thoracic surgery operating room teams. Two 90 min team-skills training sessions focused on findings from a standardised safety-culture survey administered to all participants and highlighting positive and problematic aspects of team skills, communication and leadership. Relationship of functional or less functional emotional climates of work to indices of threat to patient outcome. A less functional emotional climate corresponded to more threat to outcome in the sterile surgical environment in the pre-intervention period (pwork in the sterile surgical environment appeared to be related to threat to patient outcome prior to, but not after, a team-training intervention. Further study of the relationship between the emotional climate of work and threat to patient outcome using reproducible methods is required.

  2. Dedicated Operating Room Teams and Clinical Outcomes in an Enhanced Recovery after Surgery Pathway for Colorectal Surgery.

    Science.gov (United States)

    Grant, Michael C; Hanna, Andrew; Benson, Andrew; Hobson, Deborah; Wu, Christopher L; Yuan, Christina T; Rosen, Michael; Wick, Elizabeth C

    2018-03-01

    Our aim was to determine whether the establishment of a dedicated operating room team leads to improved process measure compliance and clinical outcomes in an Enhanced Recovery after Surgery (ERAS) program. Enhanced Recovery after Surgery programs involve the application of bundled best practices to improve the value of perioperative care. Successful implementation and sustainment of ERAS programs has been linked to compliance with protocol elements. Development of dedicated teams of anesthesia providers was a component of ERAS implementation. Intraoperative provider team networks (surgeons, anesthesiologists, and certified registered nurse anesthetists) were developed for all cases before and after implementation of colorectal ERAS. Four measures of centrality were analyzed in each network based on case assignments, and these measures were correlated with both rates of process measure compliance and clinical outcomes. Enhanced Recovery after Surgery provider teams led to a decrease in the closeness of anesthesiologists (p = 0.04) and significant increase in the clustering coefficient of certified registered nurse anesthetists (p = 0.005) compared with the pre-ERAS network. There was no significant change in centrality among surgeons (p = NS for all measures). Enhanced Recovery after Surgery designation among anesthesiologists and nurse anesthetists-whereby individual providers received an in-service on protocol elements and received compliance data was strongly associated with high compliance (>0.6 of measures; p < 0.001 for each group). In addition, high compliance was associated with a significant reduction in length of stay (p < 0.01), surgical site infection (p < 0.002), and morbidity (p < 0.009). Dedicated operating room teams led to increased centrality among anesthesia providers, which in turn not only increased compliance, but also improved several clinical outcomes. Copyright © 2017 American College of Surgeons. Published by Elsevier Inc. All rights

  3. Spacelab shaping space operations planning

    Science.gov (United States)

    Steven, F. R.; Reinhold, C.

    1976-01-01

    An up-to-date picture is presented of the organizational structure, the key management personnel, and management relationships of the Spacelab program. Attention is also given to Spacelab's development status and plans for its operations. A number of charts are provided to illustrate the organizational relations. It is pointed out that the parties involved in Spacelab activities must yet resolve questions about ownership of transportation-system elements, payloads, ground support facilities, and data obtained from space missions.

  4. Pre-license team training at San Onofre Nuclear Generating Station

    International Nuclear Information System (INIS)

    Freers, S.M.; Hyman, M.

    1987-01-01

    Team Training at San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 has been developed to enhance the performance of station operations personnel. The FACT Training Program (Formality, Attention to Detail, Consistency and Team Effort) is the common denominator for operations team training. Compliance with good operating practices is enhanced by operators working as a team toward the same goal, using the same language, practicing the same operating and communication skills, possessing a clear understanding of individual roles and responsibilities of team members and practicing attention to detail in every task. These elements of effective teamwork are emphasized by the processes and criteria used in the Pre-License Operator Training Program at SONGS

  5. 3D Boolean operations in virtual surgical planning.

    Science.gov (United States)

    Charton, Jerome; Laurentjoye, Mathieu; Kim, Youngjun

    2017-10-01

    Boolean operations in computer-aided design or computer graphics are a set of operations (e.g. intersection, union, subtraction) between two objects (e.g. a patient model and an implant model) that are important in performing accurate and reproducible virtual surgical planning. This requires accurate and robust techniques that can handle various types of data, such as a surface extracted from volumetric data, synthetic models, and 3D scan data. This article compares the performance of the proposed method (Boolean operations by a robust, exact, and simple method between two colliding shells (BORES)) and an existing method based on the Visualization Toolkit (VTK). In all tests presented in this article, BORES could handle complex configurations as well as report impossible configurations of the input. In contrast, the VTK implementations were unstable, do not deal with singular edges and coplanar collisions, and have created several defects. The proposed method of Boolean operations, BORES, is efficient and appropriate for virtual surgical planning. Moreover, it is simple and easy to implement. In future work, we will extend the proposed method to handle non-colliding components.

  6. Operations plan for the Regional Seismic Test Network

    International Nuclear Information System (INIS)

    1981-01-01

    The Regional Seismic Test Network program was established to provide a capability for detection of extremely sensitive earth movements. Seismic signals from both natural and man-made earth motions will be analyzed with the ultimate objective of accurately locating underground nuclear explosions. The Sandia National Laboratories, Albuquerque, has designed an unattended seismic station capable of recording seismic information received at the location of the seismometers installed as part of that specific station. A network of stations is required to increase the capability of determining the source of the seismic signal and the location of the source. Current plans are to establish a five-station seismic network in the United States and Canada. The Department of Energy, Nevada Operations Office, has been assigned the responsibility for deploying, installing, and operating these remote stations. This Operation Plan provides the basic information and tasking to accomplish this assignment

  7. Electric Motors Maintenance Planning From Its Operating Variables

    Science.gov (United States)

    Rodrigues, Francisco; Fonseca, Inácio; Farinha, José Torres; Ferreira, Luís; Galar, Diego

    2017-09-01

    The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, consequently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions) to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algorithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface), including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition) data, also including the communication protocols among different logical applications.

  8. Organizing for low cost space operations - Status and plans

    Science.gov (United States)

    Lee, C.

    1976-01-01

    Design features of the Space Transportation System (vehicle reuse, low cost expendable components, simple payload interfaces, standard support systems) must be matched by economical operational methods to achieve low operating and payload costs. Users will be responsible for their own payloads and will be charged according to the services they require. Efficient use of manpower, simple documentation, simplified test, checkout, and flight planning are firm goals, together with flexibility for quick response to varying user needs. Status of the Shuttle hardware, plans for establishing low cost procedures, and the policy for user charges are discussed.

  9. Test and evaluation plan for Project W-314 tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The ''Tank Farm Restoration and Safe Operations'' (TFRSO), Project W-314 will restore and/or upgrade existing Hanford Tank Farm facilities and systems to ensure that the Tank Farm infrastructure will be able to support near term TWRS Privatization's waste feed delivery and disposal system and continue safe management of tank waste. The capital improvements provided by this project will increase the margin of safety for Tank Farms operations, and will aid in aligning affected Tank Farm systems with compliance requirements from applicable state, Federal, and local regulations. Secondary benefits will be realized subsequent to project completion in the form of reduced equipment down-time, reduced health and safety risks to workers, reduced operating and maintenance costs, and minimization of radioactive and/or hazardous material releases to the environment. The original regulatory (e.g., Executive Orders, WACS, CFRS, permit requirements, required engineering standards, etc.) and institutional (e.g., DOE Orders, Hanford procedures, etc.) requirements for Project W-314 were extracted from the TWRS S/RIDs during the development of the Functions and Requirements (F and Rs). The entire family of requirements were then validated for TWRS and Project W-314. This information was contained in the RDD-100 database and used to establish the original CDR. The Project Hanford Management Contract (PHMC) team recognizes that safety, quality, and cost effectiveness in the Test and Evaluation (T and E) program is achieved through a planned systematic approach to T and E activities. It is to this end that the Test and Evaluation Plan (TEP) is created. The TEP for the TFRSO Project, was developed based on the guidance in HNF-IP-0842, and the Good Practice Guide GPG-FM-005, ''Test and Evaluation,'' which is derived from DOE Order 430.1, ''Life Cycle Asset Management.'' It describes the Test and Evaluation program for the TFRSO project starting with the definitive design phase and ending

  10. The International Space Life Sciences Strategic Planning Working Group

    Science.gov (United States)

    White, Ronald J.; Rabin, Robert; Lujan, Barbara F.

    1993-01-01

    Throughout the 1980s, ESA and the space agencies of Canada, Germany, France, Japan, and the U.S. have pursued cooperative projects bilaterally and multilaterally to prepare for, and to respond to, opportunities in space life sciences research previously unapproachable in scale and sophistication. To cope effectively with likely future space research opportunities, broad, multilateral, coordinated strategic planning is required. Thus, life scientists from these agencies have allied to form the International Space Life Sciences Strategic Planning Working Group. This Group is formally organized under a charter that specifies the purpose of the Working Group as the development of an international strategic plan for the space life sciences, with periodic revisions as needed to keep the plan current. The plan will be policy-, not operations-oriented. The Working Group also may establish specific implementation teams to coordinate multilateral science policy in specific areas; such teams have been established for space station utilization, and for sharing of flight equipment.

  11. Public affairs plan

    International Nuclear Information System (INIS)

    1995-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the fiscal year (FY) 1996 UMTRA Project public affairs program and to identify specific activities to be conducted during the year. It describes the roles of various agencies involved in the public affairs program and defines the functions of the UMTRA Project Technical Assistance Contractor (TAC) Public Affairs Department. It replaces the FY 1995 Public Affairs Plan (DOE/AL/62350-154). The plan also describes the US Department of Energy's (DOE) plans to keep stakeholders and other members of the public informed about UMTRA Project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in UMTRA Project decision-making processes. The plan applies to the UMTRA Project Team; the DOE Grand Junction Projects Office (GJPO); the DOE Albuquerque Operations Office, Office of Public Affairs (OPA); the TAC; the UMTRA Project Remedial Action Contractor (RAC); and other cooperating agencies

  12. Optimal day-ahead operational planning of microgrids

    International Nuclear Information System (INIS)

    Hosseinnezhad, Vahid; Rafiee, Mansour; Ahmadian, Mohammad; Siano, Pierluigi

    2016-01-01

    Highlights: • A new multi-objective model for optimal day-ahead operational planning of microgrids is proposed. • A new concept called seamlessness is introduced to control the sustainability of microgrid. • A new method is developed to manage the load and renewable energy resources estimation errors. • A new solution based on a combination of numerical and evolutionary approaches is proposed. - Abstract: Providing a cost-efficient, eco-friendly and sustainable energy is one of the main issues in modern societies. In response to this demand, new features of microgrid technology have provided huge potentials while distributing electricity more effectively, economically and securely. Accordingly, this paper presents a new multi-objective generation management model for optimal day-ahead operational planning of medium voltage microgrids. The proposed model optimizes both pollutant emission and operating cost of a microgrid by using multi-objective optimization. Besides, a seamlessness-selective algorithm is integrated into the model, which can be adopted to achieve the desired self-sufficiency level for microgrids along a specified planning horizon. Furthermore, the model is characterized by a reserve-assessment strategy developed to handle the load and renewable energy resources estimation errors. The introduced model is solved using a combination of numerical and evolutionary methods of species-based quantum particle swarm optimization to find the optimal scheduling scheme and minos-based optimal power flow to optimize the operating cost and emission. In addition, the suggested solution approach also incorporates an efficient mechanism for considering energy storage systems and coding the candidate solutions in the evolutionary algorithm. The proposed model is implemented on a test microgrid and is investigated through simulations to study the different aspects of the problem. The results show significant improvements and benefits which are obtained by

  13. Mixer pump long term operations plan for Tank 241-SY-101 mitigation

    International Nuclear Information System (INIS)

    Irwin, J.J.

    1994-01-01

    This document provides the general Operations Plan for performance of the mixer pump long term operations for Tank 241-SY-101 mitigation of gas retention and periodic release in Tank 101-SY. This operations plan will utilize a 112 kW (150 hp) mixing pump to agitate/suspend the particulates in the tank

  14. Modular space station, phase B extension. Program operations plan

    Science.gov (United States)

    1971-01-01

    An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.

  15. Action plan for Nordic energy co-operation 2006-2009

    International Nuclear Information System (INIS)

    2005-01-01

    The Action Plan for Nordic Energy Co-operation 2006-2009 is targeted at creating a visible and sustainable contribution to solving the most important and politically most relevant energy policy challenges faced by the Nordic region. The plan concentrates on three main areas: Energy markets; Sustainable energy system; and Nordic impact on the international agenda. The Action Plan is the energy sector's contribution to the implementation of the Nordic strategy 'Sustainable Development - New Bearing for the Nordic Countries' and to a number of the Nordic Council's recommendations for the development of the Nordic energy sector. An important element of the implementation of the action plan is on-going contact and information sharing between the Nordic Energy Policy co-operation and the Nordic Energy Research. The continues dialogue between the Nordic Council of Energy Ministers and The Nordic Council on future energy policy challenges will likewise be an important part of the political process. (BA)

  16. Using team cognitive work analysis to reveal healthcare team interactions in a birthing unit

    OpenAIRE

    Ashoori, Maryam; Burns, Catherine M.; d'Entremont, Barbara; Momtahan, Kathryn

    2014-01-01

    Cognitive work analysis (CWA) as an analytical approach for examining complex sociotechnical systems has shown success in modelling the work of single operators. The CWA approach incorporates social and team interactions, but a more explicit analysis of team aspects can reveal more information for systems design. In this paper, Team CWA is explored to understand teamwork within a birthing unit at a hospital. Team CWA models are derived from theories and models of teamworkand leverage the exis...

  17. Head and neck multidisciplinary team meetings: Effect on patient management.

    Science.gov (United States)

    Brunner, Markus; Gore, Sinclair M; Read, Rebecca L; Alexander, Ashlin; Mehta, Ankur; Elliot, Michael; Milross, Chris; Boyer, Michael; Clark, Jonathan R

    2015-07-01

    The purpose of this study was for us to present our findings on the prospectively audited impact of head and neck multidisciplinary team meetings on patient management. We collected clinical data, the pre-multidisciplinary team meeting treatment plan, the post-multidisciplinary team meeting treatment plans, and follow-up data from all patients discussed at a weekly multidisciplinary team meeting and we recorded the changes in management. One hundred seventy-two patients were discussed in 39 meetings. In 52 patients (30%), changes in management were documented of which 20 (67%) were major. Changes were statistically more likely when the referring physician was a medical or radiation oncologist, when the initial treatment plan did not include surgery, and when the histology was neither mucosal squamous cell cancer nor a skin malignancy. Compliance to the multidisciplinary team meeting treatment recommendation was 84% for all patients and 70% for patients with changes in their treatment recommendation. Head and neck multidisciplinary team meetings changed management in almost a third of the cases. © 2014 Wiley Periodicals, Inc.

  18. Planning, Management, and Economics of Airport Operation

    Science.gov (United States)

    Wiley, J.

    1972-01-01

    An overview of the role of the airport in the transportation complex and in the community is presented. The establishment of the airport including its requirements in regional planning and the operation of the airport as a social and economic force are discussed.

  19. A Test Platform for Planned Field Operations Using LEGO Mindstorms NXT

    Directory of Open Access Journals (Sweden)

    Gareth Edwards

    2013-11-01

    Full Text Available Testing agricultural operations and management practices associated with different machinery, systems and planning approaches can be both costly and time-consuming. Computer simulations of such systems are used for development and testing; however, to gain the experience of real-world performance, an intermediate step between simulation and full-scale testing should be included. In this paper, a potential common framework using the LEGO Mindstorms NXT micro-tractor platform is described in terms of its hardware and software components. The performance of the platform is demonstrated and tested in terms of its capability of supporting decision making on infield operation planning. The proposed system represents the basic measures for developing a complete test platform for field operations, where route plans, mission plans, multiple-machinery cooperation strategies and machinery coordination can be executed and tested in the laboratory.

  20. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  1. Effective Hull IMMR plan

    Energy Technology Data Exchange (ETDEWEB)

    Franco, Mireille

    2010-07-01

    The objective of the Hull Inspection, Maintenance and Repair Plan is to ensure the total integrity of the Floating Production Unit. To be efficient, the Monitoring has to be part of the Hull Inspection, Monitoring, Maintenance and Repair Plan (IMMR). The IMMR Plan should be developed during the design and project phases and take into account the interfaces between the different systems and teams' tasks in operation. The IMMR is multidisciplinary and form part of the hand-over to ensure an efficient and early implementation. Implementation of such a complex plan requires: - Cross-functionality: take advantage of the synergies - Boldness: break the mould and think outside the box - Listening: be attentive, be available, - Mutual support: during good and bad times. This paper presents the way Total believe the Hull IMMR Plan shall be developed, implemented and followed up. (Author)

  2. Using team cognitive work analysis to reveal healthcare team interactions in a birthing unit.

    Science.gov (United States)

    Ashoori, Maryam; Burns, Catherine M; d'Entremont, Barbara; Momtahan, Kathryn

    2014-01-01

    Cognitive work analysis (CWA) as an analytical approach for examining complex sociotechnical systems has shown success in modelling the work of single operators. The CWA approach incorporates social and team interactions, but a more explicit analysis of team aspects can reveal more information for systems design. In this paper, Team CWA is explored to understand teamwork within a birthing unit at a hospital. Team CWA models are derived from theories and models of teamwork and leverage the existing CWA approaches to analyse team interactions. Team CWA is explained and contrasted with prior approaches to CWA. Team CWA does not replace CWA, but supplements traditional CWA to more easily reveal team information. As a result, Team CWA may be a useful approach to enhance CWA in complex environments where effective teamwork is required. This paper looks at ways of analysing cognitive work in healthcare teams. Team Cognitive Work Analysis, when used to supplement traditional Cognitive Work Analysis, revealed more team information than traditional Cognitive Work Analysis. Team Cognitive Work Analysis should be considered when studying teams.

  3. Using team cognitive work analysis to reveal healthcare team interactions in a birthing unit

    Science.gov (United States)

    Ashoori, Maryam; Burns, Catherine M.; d'Entremont, Barbara; Momtahan, Kathryn

    2014-01-01

    Cognitive work analysis (CWA) as an analytical approach for examining complex sociotechnical systems has shown success in modelling the work of single operators. The CWA approach incorporates social and team interactions, but a more explicit analysis of team aspects can reveal more information for systems design. In this paper, Team CWA is explored to understand teamwork within a birthing unit at a hospital. Team CWA models are derived from theories and models of teamworkand leverage the existing CWA approaches to analyse team interactions. Team CWA is explained and contrasted with prior approaches to CWA. Team CWA does not replace CWA, but supplements traditional CWA to more easily reveal team information. As a result, Team CWA may be a useful approach to enhance CWA in complex environments where effective teamwork is required. Practitioner Summary: This paper looks at ways of analysing cognitive work in healthcare teams. Team Cognitive Work Analysis, when used to supplement traditional Cognitive Work Analysis, revealed more team information than traditional Cognitive Work Analysis. Team Cognitive Work Analysis should be considered when studying teams PMID:24837514

  4. Improving Human/Autonomous System Teaming Through Linguistic Analysis

    Science.gov (United States)

    Meszaros, Erica L.

    2016-01-01

    An area of increasing interest for the next generation of aircraft is autonomy and the integration of increasingly autonomous systems into the national airspace. Such integration requires humans to work closely with autonomous systems, forming human and autonomous agent teams. The intention behind such teaming is that a team composed of both humans and autonomous agents will operate better than homogenous teams. Procedures exist for licensing pilots to operate in the national airspace system and current work is being done to define methods for validating the function of autonomous systems, however there is no method in place for assessing the interaction of these two disparate systems. Moreover, currently these systems are operated primarily by subject matter experts, limiting their use and the benefits of such teams. Providing additional information about the ongoing mission to the operator can lead to increased usability and allow for operation by non-experts. Linguistic analysis of the context of verbal communication provides insight into the intended meaning of commonly heard phrases such as "What's it doing now?" Analyzing the semantic sphere surrounding these common phrases enables the prediction of the operator's intent and allows the interface to supply the operator's desired information.

  5. Operative planning of functional sessions for multisatellite observation and communication systems

    Science.gov (United States)

    Darnopykh, Valeriy V.; Malyshev, Veniamin V.

    2012-04-01

    An important control aspect of modern satellite observation and communication systems is the control of the functional processes. Functional sessions proceed under conditions of restricted technical ability, large amounts or information to be processed by the on-board equipment, practice inequality of the received information, intentions of system management and operators, interests of customers and other factors. A large number of spacecrafts (SC) in orbital constellation is one of the most important factors affecting the functional process also. Besides that some modern projects of satellite systems are multifunctional that is mixed operations of observation and communication. Therefore the functioning of SC on-board equipment must be accurately co-ordinate. That is why the problem of operative planning the functioning of these systems, while directly affecting the efficiency of the system, is very complex and actual at present. A methodical approach and software package for operative planning of functional processes for satellite observation and communication systems, including multifunctional projects, are considered in the paper. The base scheme of this approach consists of four main stages: stage 1—modeling of SC orbital kinematics and dynamics; stage 2—modeling of system functional processes with all kind of restrictions and criterion function values; stage 3—solving an optimization tasks by numerical applicable algorithms and constructing the optimal (or accuracy) plans; stage 4—repeated plan optimization (different variants) and analyzing. Such scheme is the result of authors practical research which have been realized during last 15 years by the operative planning as for any kinds of single SC as for satellite systems with different structure of orbital constellation. The research helps to unify the procedure of operative planning, to formulate basic principles and approaches for its solving, to develop special software package. The main aspects

  6. ELECTRIC MOTORS MAINTENANCE PLANNING FROM ITS OPERATING VARIABLES

    Directory of Open Access Journals (Sweden)

    Francisco RODRIGUES

    2017-07-01

    Full Text Available The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, conse-quently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algo-rithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface, including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition data, also including the communication protocols among different logical applications.

  7. The Effects of 10 Communication Modes on the Behavior of Teams During Co-Operative Problem-Solving

    Science.gov (United States)

    Ochsman, Richard B.; Chapanis, Alphonse

    1974-01-01

    Sixty teams of two college students each solved credible "real world" problems co-operatively. Conversations were carried on in one of 10 modes of communication: (1) typewriting only, (2) handwriting only, (3) handwriting and typewriting, (4) typewriting and video, (5) handwriting and video, (6) voice only, (7) voice and typewriting, (8) voice and…

  8. Operational freight carrier planning basic concepts, optimization models and advanced memetic algorithms

    CERN Document Server

    Schönberger, Jörn

    2005-01-01

    The modern freight carrier business requires a sophisticated automatic decision support in order to ensure the efficiency and reliability and therefore the survival of transport service providers. This book addresses these challenges and provides generic decision models for the short-term operations planning as well as advanced metaheuristics to obtain efficient operation plans. After a thorough analysis of the operations planning in the freight carrier business, decision models are derived. Their suitability is proven within a large number of numerical experiments, in which a new class of hybrid genetic search approaches demonstrate their appropriateness.

  9. Pandemic planning : oilsands operators and the regional municipality constantly refine strategy

    Energy Technology Data Exchange (ETDEWEB)

    Ball, C.G.

    2008-06-15

    The Alberta government anticipates that between 17 to 43 per cent of the province's population will be affected during a potential influenza pandemic. It is expected that between 3 and 12,000 Albertans will be hospitalized and up to 3000 will die. This article discussed emergency plans made by the oil and gas industry for future pandemics. Oil sands operators in the Wood Buffalo municipality prepared plans based on guidelines made by the World Health Organization (WHO) and various government bodies. The transient nature of the region's population and its limited health resources may increase the level of risk associated with a pandemic. The planning process adopted by the region has been designed to provide staff with the ability to deal with increased numbers of people visiting the hospital. The planning process includes training exercises that range from desktop drills to the setting up of triage areas. Other plans include the identification of operations and processes that would be at risk in the event of a pandemic, as well the identification of key operations and roles. Plans are constantly being refined in order to identify new areas of risk. 1 fig.

  10. Influenza pandemic planning guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-11-15

    An influenza pandemic will have serious economic impacts on the natural gas industry due to absenteeism as well as downstream effects due to supply disruption.This guide was prepared to assist gas distribution companies in planning for an influenza epidemic. The guide aimed to minimize the risks that an influenza pandemic might pose to the health and safety of employees and the continuity of business operations. The guide discussed 5 critical aspects of emergency planning: (1) prevention and threat mitigation; (2) preparedness; (3) response; (4) business continuity; and (5) communication. The legal context of the emergency plans were discussed. The plans were also discussed to other essential infrastructure emergency response plans. Recommendations were presented for infection control, decentralization and access restriction. Outlines for pandemic response planning teams and training and exercise programs were provided. Issues related to alert, mobilization, and response procedures were also discussed. 10 refs., 3 tabs., 1 fig.

  11. Understanding Team Communication Characteristics using Social Network Analysis

    International Nuclear Information System (INIS)

    Kim, Ar Ryum; Lee, Seung Woo; Seong, Poong Hyun; Park, Jin Kyun

    2011-01-01

    An important aspect of human behavior in nuclear power plants (NPPs) is team interaction since operating NPPs involves the coordination of several team members among and within workplaces. Since operators in main control room (MCR) get a great deal of information through communication to perform a task, communication is one of the important characteristics for team characteristics. Many researchers have been studying how to understand the characteristics of communication. Social network analysis (SNA) which is considered as an objective and easily applicable method has been already applied in many fields to investigate characteristics of team communication. Henttonen (2010) has struggled to perform the research on the impact of social networks in a team and he found some team communication characteristics could be obtained using some properties of SNA. In this paper, SNA is used to understand communication characteristics within operators in NPPs

  12. Summary of Tiger Team Assessment and Technical Safety Appraisal recurring concerns in the Operations Area

    International Nuclear Information System (INIS)

    1993-01-01

    Fourteen Tiger Team Assessment and eight Technical Safety Appraisal (TSA) final reports have been received and reviewed by the DOE Training Coordination Program during Fiscal Year 1992. These assessments and appraisals included both reactor and non-reactor nuclear facilities in their reports. The Tiger Team Assessments and TSA reports both used TSA performance objectives, and list ''concerns'' as a result of their findings. However, the TSA reports categorized concerns into the following functional areas: (1) Organization and Administration, (2) Radiation Protection, (3) Nuclear Criticality Safety, (4) Occupational Safety, (5) Engineering/Technical Support, (6) Emergency Preparedness, (7) Safety Assessments, (8) Quality Verification, (9) Fire Protection, (10) Environmental Protection, and (11) Energetic Materials Safety. Although these functional areas match most of the TSA performance objectives, not all of the TSA performance objectives are addressed. For example, the TSA reports did not include Training, Maintenance, and Operations as functional areas. Rather, they included concerns that related to these topics throughout the 11 functional areas identified above. For consistency, the Operations concerns that were identified in each of the TSA report functional areas have been included in this summary with the corresponding TSA performance objective

  13. Mission Operations Planning with Preferences: An Empirical Study

    Science.gov (United States)

    Bresina, John L.; Khatib, Lina; McGann, Conor

    2006-01-01

    This paper presents an empirical study of some nonexhaustive approaches to optimizing preferences within the context of constraint-based, mixed-initiative planning for mission operations. This work is motivated by the experience of deploying and operating the MAPGEN (Mixed-initiative Activity Plan GENerator) system for the Mars Exploration Rover Mission. Responsiveness to the user is one of the important requirements for MAPGEN, hence, the additional computation time needed to optimize preferences must be kept within reasonabble bounds. This was the primary motivation for studying non-exhaustive optimization approaches. The specific goals of rhe empirical study are to assess the impact on solution quality of two greedy heuristics used in MAPGEN and to assess the improvement gained by applying a linear programming optimization technique to the final solution.

  14. Innovations for ISS Plug-In Plan (IPiP) Operations

    Science.gov (United States)

    Moore, Kevin D.

    2013-01-01

    Limited resources and increasing requirements will continue to influence decisions on ISS. The ISS Plug-In Plan (IPiP) supports power and data for utilization, systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Given the fluid launch schedule, the focus of the Plug-In Plan has evolved to anticipate future requirements by judicious development and delivery of power supplies, power strips, Alternating Current (AC) power inverters, along with innovative deployment strategies. A partnership of ISS Program Office, Engineering Directorate, Mission Operations, and International Partners poses unique solutions with existing on-board equipment and resources.

  15. SPHERES: From Ground Development to Operations on ISS

    Science.gov (United States)

    Katterhagen, A.

    2015-01-01

    SPHERES (Synchronized Position Hold Engage and Reorient Experimental Satellites) is an internal International Space Station (ISS) Facility that supports multiple investigations for the development of multi-spacecraft and robotic control algorithms. The SPHERES Facility on ISS is managed and operated by the SPHERES National Lab Facility at NASA Ames Research Center (ARC) at Moffett Field California. The SPHERES Facility on ISS consists of three self-contained eight-inch diameter free-floating satellites which perform the various flight algorithms and serve as a platform to support the integration of experimental hardware. To help make science a reality on the ISS, the SPHERES ARC team supports a Guest Scientist Program (GSP). This program allows anyone with new science the possibility to interface with the SPHERES team and hardware. In addition to highlighting the available SPHERES hardware on ISS and on the ground, this presentation will also highlight ground support, facilities, and resources available to guest researchers. Investigations on the ISS evolve through four main phases: Strategic, Tactical, Operations, and Post Operations. The Strategic Phase encompasses early planning beginning with initial contact by the Principle Investigator (PI) and the SPHERES program who may work with the PI to assess what assistance the PI may need. Once the basic parameters are understood, the investigation moves to the Tactical Phase which involves more detailed planning, development, and testing. Depending on the nature of the investigation, the tactical phase may be split into the Lab Tactical Phase or the ISS Tactical Phase due to the difference in requirements for the two destinations. The Operations Phase is when the actual science is performed; this can be either in the lab, or on the ISS. The Post Operations Phase encompasses data analysis and distribution, and generation of summary status and reports. The SPHERES Operations and Engineering teams at ARC is composed of

  16. The Joint Influence of Intra- and Inter-Team Learning Processes on Team Performance : A Constructive or Destructive Combination?

    NARCIS (Netherlands)

    Bron, Rike; Endedijk, Maaike D.; van Veelen, Ruth; Veldkamp, Bernard P.

    2018-01-01

    In order for teams to build a shared conception of their task, team learning is crucial. Benefits of intra-team learning have been demonstrated in numerous studies. However, teams do not operate in a vacuum, and interact with their environment to execute their tasks. Our knowledge of the added value

  17. 7 CFR 272.2 - Plan of operation.

    Science.gov (United States)

    2010-01-01

    ... next year, State agencies shall consider major corrective action objectives, existing program strengths... Plan of Operation. The State and FNS (USDA) further agree to fully comply with any changes in Federal... belief, religion, handicap, or national origin, be excluded from participation in, be denied the benefits...

  18. Operational Plan for Underground Storage Tank 322 R2U2

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-06-07

    This Operational Plan provides the operator of the tank system with guidelines relating to the safe and compliant operation and maintenance of the tank system. The tank system schematic and list of emergency contacts shall be posted near the tank so they are visible to tank personnel. This Operational Plan shall be kept on file by the Facility Supervisor. It should be understood when managing this tank system that it is used to store hazardous waste temporarily for 90 calendar days or less. The rinsewater handled in the tank system is considered hazardous and may exhibit the characteristic of toxicity.

  19. Committee on the safety of nuclear installations - Operating plan (2006 - 2009)

    International Nuclear Information System (INIS)

    2007-01-01

    In 2004, NEA issued its Strategic Plan covering the period 2005-2009, addressing the NEA activities associated with nuclear safety and regulation. Committee on the Safety of Nuclear Installations (CSNI) and Committee on Nuclear Regulatory Activities (CNRA), which have the primary responsibility for activities in this area, have developed and issued a joint strategic plan covering this same time period. As requested in the Joint Strategic Plan, each committee is to prepare an operating plan which describes in more detail the committee's organisation, planned activities, priorities and operating procedures to be used to implement the Joint Strategic Plan. In effect, the Joint Strategic Plan defines what type of work CSNI should do, whereas the Operating Plan describes the overall work scope and how to accomplish it to meet the joint CSNI/CNRA Strategic Plan objectives and mission. The present Operating Plan follows and takes into account the outcome of a CSNI assessment group, which has evaluated the CSNI activities. The assessment group expressed appreciation for the CSNI role and activity, while making recommendations with regards to scope of work and way to operate in order to further improve efficiency. The main objectives of CSNI are to: - Keep all member countries involved in and abreast of developments in safety technology. - Review operating experience with the objective to identify safety issues that need to be addressed by new research. - Review the state-of-knowledge on selected topics of nuclear safety technology and safety assessment. - Promote training and research projects that serve to maintain competence in nuclear safety matters. - Promote research as needed to reach consensus on nuclear safety issues of common interest. - Consider the safety implications of scientific and technical developments. To accomplish these objectives, CSNI is organised into six permanent working groups (as described in Section II), each covering a different set of

  20. 36 CFR 292.66 - Operating plan requirements-outstanding mineral rights.

    Science.gov (United States)

    2010-07-01

    ... products, insecticides, pesticides, and herbicides that will be used during the mineral operation and the...-site and off-site damage to natural resources resulting from mineral operations. The plan must: (i...

  1. Linear programming models with planned lead times for supply chain operations planning

    NARCIS (Netherlands)

    Spitter, J.M.; Hurkens, C.A.J.; Kok, de A.G.; Lenstra, J.K.; Negenman, E.G.

    2005-01-01

    This paper contributes to the development of models for capacity constrained Supply Chain Operations Planning (SCOP). We focus on production environments with arbitrary supply chain structures. The demand for the end items is assumed to be exogenously determined. We solve the SCOP problem with

  2. Error or "act of God"? A study of patients' and operating room team members' perceptions of error definition, reporting, and disclosure.

    Science.gov (United States)

    Espin, Sherry; Levinson, Wendy; Regehr, Glenn; Baker, G Ross; Lingard, Lorelei

    2006-01-01

    Calls abound for a culture change in health care to improve patient safety. However, effective change cannot proceed without a clear understanding of perceptions and beliefs about error. In this study, we describe and compare operative team members' and patients' perceptions of error, reporting of error, and disclosure of error. Thirty-nine interviews of team members (9 surgeons, 9 nurses, 10 anesthesiologists) and patients (11) were conducted at 2 teaching hospitals using 4 scenarios as prompts. Transcribed responses to open questions were analyzed by 2 researchers for recurrent themes using the grounded-theory method. Yes/no answers were compared across groups using chi-square analyses. Team members and patients agreed on what constitutes an error. Deviation from standards and negative outcome were emphasized as definitive features. Patients and nurse professionals differed significantly in their perception of whether errors should be reported. Nurses were willing to report only events within their disciplinary scope of practice. Although most patients strongly advocated full disclosure of errors (what happened and how), team members preferred to disclose only what happened. When patients did support partial disclosure, their rationales varied from that of team members. Both operative teams and patients define error in terms of breaking the rules and the concept of "no harm no foul." These concepts pose challenges for treating errors as system failures. A strong culture of individualism pervades nurses' perception of error reporting, suggesting that interventions are needed to foster collective responsibility and a constructive approach to error identification.

  3. A High-Speed Train Operation Plan Inspection Simulation Model

    Directory of Open Access Journals (Sweden)

    Yang Rui

    2018-01-01

    Full Text Available We developed a train operation simulation tool to inspect a train operation plan. In applying an improved Petri Net, the train was regarded as a token, and the line and station were regarded as places, respectively, in accordance with the high-speed train operation characteristics and network function. Location change and running information transfer of the high-speed train were realized by customizing a variety of transitions. The model was built based on the concept of component combination, considering the random disturbance in the process of train running. The simulation framework can be generated quickly and the system operation can be completed according to the different test requirements and the required network data. We tested the simulation tool when used for the real-world Wuhan to Guangzhou high-speed line. The results showed that the proposed model can be developed, the simulation results basically coincide with the objective reality, and it can not only test the feasibility of the high-speed train operation plan, but also be used as a support model to develop the simulation platform with more capabilities.

  4. Characteristics of team briefings in gynecological surgery.

    Science.gov (United States)

    Forsyth, Katherine L; Hildebrand, Emily A; Hallbeck, M Susan; Branaghan, Russell J; Blocker, Renaldo C

    2018-02-24

    Preoperative briefings have been proven beneficial for improving team performance in the operating room. However, there has been minimal research regarding team briefings in specific surgical domains. As part of a larger project to develop a briefing structure for gynecological surgery, the study aimed to better understand the current state of pre-operative team briefings in one department of an academic hospital. Twenty-four team briefings were observed and video recorded. Communication was analyzed and social network metrics were created based on the team member verbal interactions. Introductions occurred in only 25% of the briefings. Network analysis revealed that average team briefings exhibited a hierarchical structure of communication, with the surgeon speaking the most frequently. The average network for resident-led briefings displayed a non-hierarchical structure with all team members communicating with the resident. Briefings conducted without a standardized protocol can produce variable communication between the role leading and the team members present. Copyright © 2018 Elsevier Ltd. All rights reserved.

  5. Development of new taxonomy of inappropriate communication and its application to operating teams in nuclear power plants

    International Nuclear Information System (INIS)

    Kim, Ar Ryum; Lee, Seung Woo; Jang, In Seok; Kang, Hyun Gook; Seong, Poong Hyun; Park, Jin Kyun

    2012-01-01

    Inappropriate communications can cause a lack of necessary information exchange between operators and lead to serious consequences in large process systems such as nuclear power plants (NPPs). In this regard, various kinds of taxonomies of inappropriate communications have been developed to prevent inappropriate communications. However, there seems to be difficult to identify inappropriate communications from verbal protocol data between operators. Because the existing taxonomies were developed for use in report analysis, there is a problem of 'uncertainty'. In consequence, this paper proposes a new taxonomy of inappropriate communications and provides some insights to prevent inappropriate communications. In order to develop the taxonomy, existing taxonomies for four industries from 1980 to 2010 were collected and a new taxonomy is developed based on the simplified one-way communication model. In addition, the ratio of inappropriate communications from 8 samples of audio-visual format verbal protocol data recorded during emergency training sessions by operating teams is compared with performance scores calculated based on the task analysis. As a result, inappropriate communications can be easily identified from the verbal protocol data using the suggested taxonomy, and teams with a higher ratio of inappropriate communications tend to have a lower performance score.

  6. Development of new taxonomy of inappropriate communication and its application to operating teams in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Ar Ryum; Lee, Seung Woo; Jang, In Seok; Kang, Hyun Gook; Seong, Poong Hyun [Dept. of Nuclear and Quantum Engineering, Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Park, Jin Kyun [Integrated Safety Assessment Division, Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-12-15

    Inappropriate communications can cause a lack of necessary information exchange between operators and lead to serious consequences in large process systems such as nuclear power plants (NPPs). In this regard, various kinds of taxonomies of inappropriate communications have been developed to prevent inappropriate communications. However, there seems to be difficult to identify inappropriate communications from verbal protocol data between operators. Because the existing taxonomies were developed for use in report analysis, there is a problem of 'uncertainty'. In consequence, this paper proposes a new taxonomy of inappropriate communications and provides some insights to prevent inappropriate communications. In order to develop the taxonomy, existing taxonomies for four industries from 1980 to 2010 were collected and a new taxonomy is developed based on the simplified one-way communication model. In addition, the ratio of inappropriate communications from 8 samples of audio-visual format verbal protocol data recorded during emergency training sessions by operating teams is compared with performance scores calculated based on the task analysis. As a result, inappropriate communications can be easily identified from the verbal protocol data using the suggested taxonomy, and teams with a higher ratio of inappropriate communications tend to have a lower performance score.

  7. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    Energy Technology Data Exchange (ETDEWEB)

    KIRKBRIDE, R.A.

    1999-05-04

    The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy.

  8. Review Team Focused Modeling Analysis of Radial Collector Well Operation on the Hypersaline Groundwater Plume beneath the Turkey Point Site near Homestead, Florida

    International Nuclear Information System (INIS)

    Oostrom, Martinus; Vail, Lance W.

    2016-01-01

    Researchers at Pacific Northwest National Laboratory served as members of a U.S. Nuclear Regulatory Commission review team for the Florida Power & Light Company's application for two combined construction permits and operating licenses (combined licenses or COLs) for two proposed new reactor units-Turkey Point Units 6 and 7. The review team evaluated the environmental impacts of the proposed action based on the October 29, 2014 revision of the COL application, including the Environmental Report, responses to requests for additional information, and supplemental information. As part of this effort, team members tasked with assessing the environmental effects of proposed construction and operation of Units 6 and 7 at the Turkey Point site reviewed two separate modeling studies that analyzed the interaction between surface water and groundwater that would be altered by the operation of radial collector wells (RCWs) at the site. To further confirm their understanding of the groundwater hydrodynamics and to consider whether certain actions, proposed after the two earlier modeling studies were completed, would alter the earlier conclusions documented by the review team in their draft environmental impact statement (EIS; NRC 2015), a third modeling analysis was performed. The third modeling analysis is discussed in this report.

  9. 77 FR 37283 - General Provisions; Operating and Strategic Business Planning; Effective Date

    Science.gov (United States)

    2012-06-21

    ... directors of each Farm Credit System institution to adopt an operational and strategic business plan to... FARM CREDIT ADMINISTRATION 12 CFR Part 618 RIN 3052-AC66 General Provisions; Operating and Strategic Business Planning; Effective Date AGENCY: Farm Credit Administration. ACTION: Notice of effective...

  10. Computer guided pre-operative planning and dental implant placement

    Directory of Open Access Journals (Sweden)

    Dušan Grošelj

    2007-05-01

    Full Text Available Background: Implants in dentistry are, besides fixed, removable and maxillofacial prosthodontics, one of the reliable possibility to make functional and aesthetic rehabilitation of the edentulism. Surgical and prosthodontic implant complications are often an inattentive consequence of wrong diagnosis, planning, and placement. In this article we present a technique using a highly advanced software program along with a rapid prototyping technology named stereolithography. A planning software for implant placement needs basically the high quality computed tomographic scan of one or both jaws for making accurate preoperative diagnostics and 3D preoperative plan. Later individual drill guide is designed and generated based on both the CT images and the preoperative planning. The patient specific drill guide transfers the virtual planning to the patient’s mouth at time of surgery.Conclusions: The advantages of computer guided implantology are the better prepared surgery with visualisation of critical anatomic structures, assessment of available bone and data about bone quality, increased confidence for the surgeon, deceased operative time, less frequent use of bone grafts, higher quality of collaboration between specialists and prosthetic lab and better communication with patients. Radiographic examination of the operation field for computer guided planning for implant placement is due to high costs justified as the most important information source on the areas to be implanted.

  11. Presentation of the CEA's crisis national organization: coordination centre in case of crisis, crisis technical teams, intervention means, and so on

    International Nuclear Information System (INIS)

    Pectorin, X.

    2010-01-01

    After having briefly recalled the existence of a legal framework for crisis management organisation, this report briefly describes how the CEA plans the crisis management. This management is based on the definition of critical scenarios, on the building up of a crisis management team, and on the elaboration of crisis management operational documents. It evokes the alert organisation and the triggering of crisis management. Then, it describes the CEA's national crisis organisation with its main crisis management structures, the role and the operation of the Crisis Coordination Centre (CCC, the decision body), the role and operation of the Central Crisis Technical Teams (ETC-C, Equipes Techniques de Crise Centrales), the role of field interveners (various rescue, protection, health care and technical teams) and of other additional intervention actors. It evokes the objectives of the various exercises which are organised every year at the internal, national or international level

  12. Light Duty Utility Arm system pre-operational (cold test) test plan

    International Nuclear Information System (INIS)

    Bennett, K.L.

    1995-01-01

    The Light Duty Utility (LDUA) Cold Test Facility, located in the Hanford 400 Area, will be used to support cold testing (pre- operational tests) of LDUA subsystems. Pre-operational testing is composed of subsystem development testing and rework activities, and integrated system qualification testing. Qualification testing will be conducted once development work is complete and documentation is under configuration control. Operational (hot) testing of the LDUA system will follow the testing covered in this plan and will be covered in a separate test plan

  13. Improving the Operations of the Earth Observing One Mission via Automated Mission Planning

    Science.gov (United States)

    Chien, Steve A.; Tran, Daniel; Rabideau, Gregg; Schaffer, Steve; Mandl, Daniel; Frye, Stuart

    2010-01-01

    We describe the modeling and reasoning about operations constraints in an automated mission planning system for an earth observing satellite - EO-1. We first discuss the large number of elements that can be naturally represented in an expressive planning and scheduling framework. We then describe a number of constraints that challenge the current state of the art in automated planning systems and discuss how we modeled these constraints as well as discuss tradeoffs in representation versus efficiency. Finally we describe the challenges in efficiently generating operations plans for this mission. These discussions involve lessons learned from an operations model that has been in use since Fall 2004 (called R4) as well as a newer more accurate operations model operational since June 2009 (called R5). We present analysis of the R5 software documenting a significant (greater than 50%) increase in the number of weekly observations scheduled by the EO-1 mission. We also show that the R5 mission planning system produces schedules within 15% of an upper bound on optimal schedules. This operational enhancement has created value of millions of dollars US over the projected remaining lifetime of the EO-1 mission.

  14. Oceanic gamefish/Skylab project field operating plan for operations 4, 5 August. [in Gulf of Mexico

    Science.gov (United States)

    1973-01-01

    The operation plans are presented for the oceanic Gamefish/Skylab Experiment 240, which was conducted to obtain fish catch data for the northeast area of the Gulf of Mexico. The plans for surface measurements, aerial observations, and communications are included.

  15. How to manage organisational change and create practice teams: experiences of a South African primary care health centre.

    Science.gov (United States)

    Mash, B J; Mayers, P; Conradie, H; Orayn, A; Kuiper, M; Marais, J

    2008-07-01

    In South Africa, first-contact primary care is delivered by nurses in small clinics and larger community health centres (CHC). CHCs also employ doctors, who often work in isolation from the nurses, with poor differentiation of roles and little effective teamwork or communication. Worcester CHC, a typical public sector CHC in rural South Africa, decided to explore how to create more successful practice teams of doctors and nurses. This paper is based on their experience of both unsuccessful and successful attempts to introduce practice teams and reports on their learning regarding organisational change. An emergent action research study design utilised a co-operative inquiry group. The first nine months of inquiry focused on understanding the initial unsuccessful attempt to create practice teams. This paper reports primarily on the subsequent nine months (four cycles of planning, action, observation and reflection) during which practice teams were re-introduced. The central question was how more effective practice teams of doctors and nurses could be created. The group utilised outcome mapping to assist with planning, monitoring and evaluation. Outcome mapping defined a vision, mission, boundary partners, outcome challenges, progress markers and strategies for the desired changes and supported quantitative monitoring of the process. Qualitative data were derived from the co-operative inquiry group (CIG) meetings and interviews with doctors, nurses, practice teams and patients. The CIG engaged effectively with 68% of the planned strategies, and more than 60% of the progress markers were achieved for clinical nurse practitioners, doctors, support staff and managers, but not for patients. Key themes that emerged from the inquiry group's reflection on their experience of the change process dealt with the amount of interaction, type of communication, team resilience, staff satisfaction, leadership style, reflective capacity, experimentation and evolution of new

  16. Tank waste remediation system configuration management implementation plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program

  17. We Are Going to Name Names and Call You Out! Improving the Team in the Academic Operating Room Environment.

    Science.gov (United States)

    Bodor, Richard; Nguyen, Brian J; Broder, Kevin

    2017-05-01

    Communication failures between multidisciplinary teams can impact efficiency, performance, and morale. Academic operating rooms (ORs) often have surgical, anesthesia, and nursing teams, each teaching multiple trainees. Incorrectly identifying name and "rank" (postgraduate year [PGY]) of resident trainees can disrupt performance evaluations and team morale and even potentially impair delivery of quality care when miscommunication errors proliferate. Our OR-based survey asked 50 participants (18 surgeons, 14 anesthesiologists, and 18 nursing members), to recall basic identification data including provider names and PGY levels from their recent collaborating OR teams. Participants also weighed in on the importance of using accurate "names and ranks" for all OR participants. Each service reliably knew their own team members' names and rank. However, surgery and anesthesia teams displayed decreased knowledge about their lower level trainees, whereas nursing teams performed best, identifying all level nurses present. Deficits occurred whenever participants tried recalling basic identifying data about contributors from any other collaborating team. Typically, misidentified participants were lower level PGY residents working on other teams' services. All survey respondents desired improving systems to better remember "names and ranks" identifications among OR participants, citing both safety and team morale benefits. Many fail to know the names and ranks of contributors among members of different OR teams. Even our most reliable nursing team was inconsistent at identification information from collaborating practitioners. Despite universally acknowledged benefits, participants rarely learned basic background identification data beyond their own team. Those surveyed all desired improving identifications with suggestions including sterile name and rank tags and proper notification of entry and exit from the OR. Because successful collaborations require appropriate level task

  18. Advances in Distributed Operations and Mission Activity Planning for Mars Surface Exploration

    Science.gov (United States)

    Fox, Jason M.; Norris, Jeffrey S.; Powell, Mark W.; Rabe, Kenneth J.; Shams, Khawaja

    2006-01-01

    A centralized mission activity planning system for any long-term mission, such as the Mars Exploration Rover Mission (MER), is completely infeasible due to budget and geographic constraints. A distributed operations system is key to addressing these constraints; therefore, future system and software engineers must focus on the problem of how to provide a secure, reliable, and distributed mission activity planning system. We will explain how Maestro, the next generation mission activity planning system, with its heavy emphasis on portability and distributed operations has been able to meet these design challenges. MER has been an excellent proving ground for Maestro's new approach to distributed operations. The backend that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

  19. Iterative Repair Planning for Spacecraft Operations Using the Aspen System

    Science.gov (United States)

    Rabideau, G.; Knight, R.; Chien, S.; Fukunaga, A.; Govindjee, A.

    2000-01-01

    This paper describes the Automated Scheduling and Planning Environment (ASPEN). ASPEN encodes complex spacecraft knowledge of operability constraints, flight rules, spacecraft hardware, science experiments and operations procedures to allow for automated generation of low level spacecraft sequences. Using a technique called iterative repair, ASPEN classifies constraint violations (i.e., conflicts) and attempts to repair each by performing a planning or scheduling operation. It must reason about which conflict to resolve first and what repair method to try for the given conflict. ASPEN is currently being utilized in the development of automated planner/scheduler systems for several spacecraft, including the UFO-1 naval communications satellite and the Citizen Explorer (CX1) satellite, as well as for planetary rover operations and antenna ground systems automation. This paper focuses on the algorithm and search strategies employed by ASPEN to resolve spacecraft operations constraints, as well as the data structures for representing these constraints.

  20. An overview and guide: planning instructional radio.

    Science.gov (United States)

    Imhoof, M

    1984-03-01

    Successful instructional radio projects require both comprehensive and complex planning. The instructional radio planning team needs to have knowledge and capabilities in several technical, social, and educational areas. Among other skills, the team must understand radio, curriculum design, the subject matter being taught, research and evaluation, and the environment in which the project operates. Once a basic approach to educational planning has been selected and broad educational goals set, radio may be selected as a cost effective means of achieving some of the goals. Assuming radio is a wise choice, there are still several factors which must be analyzed by a team member who is a radio specialist. The most obvious consideration is the inventory and evaluation of the facilities: studios; broadcast, recording, and transmission equipment; classroom radios; and so on. Capabilities of broadcast personnel are another consideration. Initial radio lessons need to teach the learners how to listen to the radio if they have no previous experience with institutional radio broadcasts. A captive, inschool audience ready to listen to radio instructions requires a different use of the medium than a noncaptive audience. With the noncaptive audience, the educational broadcaster must compete with entertaining choices from other media and popular activities and pastimes of the community. The most complex knowledge and analysis required in planning instructional radio concerns the relationship of the content to the medium. Environmental factors are important in planning educational programs. The physical environment may present several constraints on the learning experience and the use of radio. The most obvious is the effect of climate and terrain on the quality of radio reception. The physical environment is easily studied through experience in the target area, but this knowledge plays a significant role in designing effective learning materials for specific learners. Social

  1. Development of Nuclear Safety Culture evaluation method for an operation team based on the probabilistic approach

    International Nuclear Information System (INIS)

    Han, Sang Min; Lee, Seung Min; Yim, Ho Bin; Seong, Poong Hyun

    2018-01-01

    Highlights: •We proposed a Probabilistic Safety Culture Healthiness Evaluation Method. •Positive relationship between the ‘success’ states of NSC and performance was shown. •The state probability profile showed a unique ratio regardless of the scenarios. •Cutset analysis provided not only root causes but also the latent causes of failures. •Pro-SCHEMe was found to be applicable to Korea NPPs. -- Abstract: The aim of this study is to propose a new quantitative evaluation method for Nuclear Safety Culture (NSC) in Nuclear Power Plant (NPP) operation teams based on the probabilistic approach. Various NSC evaluation methods have been developed, and the Korea NPP utility company has conducted the NSC assessment according to international practice. However, most of methods are conducted by interviews, observations, and the self-assessment. Consequently, the results are often qualitative, subjective, and mainly dependent on evaluator’s judgement, so the assessment results can be interpreted from different perspectives. To resolve limitations of present evaluation methods, the concept of Safety Culture Healthiness was suggested to produce quantitative results and provide faster evaluation process. This paper presents Probabilistic Safety Culture Healthiness Evaluation Method (Pro-SCHEMe) to generate quantitative inputs for Human Reliability Assessment (HRA) in Probabilistic Safety Assessment (PSA). Evaluation items which correspond to a basic event in PSA are derived in the first part of the paper through the literature survey; mostly from nuclear-related organizations such as the International Atomic Energy Agency (IAEA), the United States Nuclear Regulatory Commission (U.S.NRC), and the Institute of Nuclear Power Operations (INPO). Event trees (ETs) and fault trees (FTs) are devised to apply evaluation items to PSA based on the relationships among such items. The Modeling Guidelines are also suggested to classify and calculate NSC characteristics of

  2. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.J.

    1980-07-01

    The NRC plan defines the functional role of the NRC in cleanup operations at Three Mile Island Unit 2 to assure that agency regulatory responsibilities and objectives will be fulfilled. The plan outlines NRC functions in TMI-2 cleanup operations in the following areas: (1) the functional relationship of NRC to other government agencies, the public, and the licensee to coordinate activities, (2) the functional roles of these organizations in cleanup operations, (3) the NRC review and decision-making procedure for the licensee's proposed cleanup operation, (4) the NRC/licensee estimated schedule of major actions, and (5) NRC's functional role in overseeing implementation of approved licensee activities

  3. Tool for Military Logistics Planning of Peace Support Operations: The OTAS Planning Tool

    NARCIS (Netherlands)

    Merrienboer, S.A. van

    1998-01-01

    Within the research group Operations Research Studies Army of the TNO Physics and Electronics Laboratory the OTAS planning tool is developed for the Royal Netherlands Armed Forces. This paper gives a general and brief description of the tool.

  4. Whakaora nga moemoea o nga tupuna--living the dreams of the ancestors. Future planning in a Kaupapa Māori CAMHS team.

    Science.gov (United States)

    Elder, Hinemoa; Milne, Moe; Witehira, Heemi; Mendes, Patrick; Heslin, Anneliese; Cribb-Su'a, Ainsleigh; Wilson, Riwai; Goldsmith, Arona; Kainamu, Reena; Barrett, Moana; Love, Shar; Cargo, Tania; Kalra, Vanitha

    2009-08-01

    The aim of this study was to identify and operationalize aspects of a future planning process for sustainable delivery of Kaupapa Māori (Specialist Māori) mental health from a team called He Kakano, within Child and Adolescent Mental Health Services in South Auckland, New Zealand. A 2-day hui (meeting) was held with members of the team and a facilitator, Whaea Moe Milne. Review of background national epidemiological data, local data, information from community, carer and tangata whaiora (consumer) stakeholders and the existing He Kakano Model of Care was undertaken. Use of tikanga (Māori protocol and practices) was evident throughout the hui. A number of aspects of tikanga were identified as essential to the positive outcomes of the future plan. This paper reports one in particular, that of whakatauakī (proverbs where the originator is known). "Whakaora nga moemoea o nga tupuna--living the dreams of the ancestors" is a whakatauakī articulated by Whaea Moe Milne, which was identified as helpful in influencing the strategic planning thinking and decision-making process for He Kakano. This whakatauakī enabled the identification of shared goals, values, beliefs, behaviours and an action plan. The existing and ongoing relationship with Whaea Moe Milne was identified as an important element in the way in which the whakatauakī was received and reflected on. Use of tikanga Māori, in this case, whakatauakī, was helpful in developing future planning for He Kakano. This suggests that use of tikanga may be beneficial in other settings where planning for sustainable Māori responsive services is undertaken. Further work in this area is likely to benefit service development, strategic planning, workforce development and have an impact on improving health outcomes for Māori.

  5. Motion and operation planning of robotic systems background and practical approaches

    CERN Document Server

    Gomez-Barvo, Fernando

    2015-01-01

    This book addresses the broad multi-disciplinary topic of robotics, and presents the basic techniques for motion and operation planning in robotics systems. Gathering contributions from experts in diverse and wide ranging fields, it offers an overview of the most recent and cutting-edge practical applications of these methodologies. It covers both theoretical and practical approaches, and elucidates the transition from theory to implementation. An extensive analysis is provided, including humanoids, manipulators, aerial robots and ground mobile robots. ‘Motion and Operation Planning of Robotic Systems’ addresses the following topics: *The theoretical background of robotics. *Application of motion planning techniques to manipulators, such as serial and parallel manipulators. *Mobile robots planning, including robotic applications related to aerial robots, large scale robots and traditional wheeled robots. *Motion planning for humanoid robots. An invaluable reference text for graduate students and researche...

  6. Institutional plan -- Institute of Nuclear Power Operations, 1993

    International Nuclear Information System (INIS)

    1993-01-01

    The US nuclear electric utility industry established the Institute of Nuclear Power Operations (INPO) in 1979 to promote the highest levels of safety and reliability -- to promote excellence -- in the operation of its nuclear plants. After its formation, the Institute grew from a handful of on-loan personnel in late 1979 to an established work force of more than 400 permanent and on-loan personnel. INPO's early years were marked by growth and evolution of its programs and organization. The Institute now focuses primarily on the effectiveness and enhancement of established programs and activities. For INPO to carry out its role, it must have the support of its members and participants and a cooperative but independent relationship with the NRC. A basis for that support and cooperation is an understanding of INPO's role. This Institutional Plan is intended to provide that understanding by defining the Institute's role and its major programs. This plan considers the existing and projected needs of the industry and the overall environment in which INPO and its members and participants operate

  7. Integrating Defense, Diplomacy, and Development (3 D) in the Naval Special Warfare Operator

    Science.gov (United States)

    2010-12-01

    usually filling the executive positions, is equivalent to different roles of the players of a sports team and their coaches. The operators are the...them on what SOF resources can be provided to a country team’s counterterrorism campaign plan. 1. The Operator With Al Qaeda developing franchise

  8. Leading a Virtual Intercultural Team. Implications for Virtual Team Leaders

    OpenAIRE

    Chutnik, Monika; Grzesik, Katarzyna

    2009-01-01

    Increasing number of companies operate in the setup of teams whose members are geographically scattered and have different cultural origins. They work through access to the same digital network and communicate by means of modern technology. Sometimes they are located in different time zones and have never met each other face to face. This is the age of a virtual team leader. Virtual leadership in intercultural groups requires special skills from leaders. Many of these reflect leadership s...

  9. 30 CFR 903.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 903.784 Section 903.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application...

  10. 30 CFR 910.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 910.784 Section 910.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  11. 30 CFR 947.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 947.784 Section 947.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  12. 30 CFR 942.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 942.784 Section 942.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  13. 30 CFR 939.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 939.784 Section 939.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  14. 30 CFR 921.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 921.780 Section 921.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  15. 30 CFR 941.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 941.784 Section 941.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  16. 30 CFR 922.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 922.784 Section 922.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  17. 30 CFR 933.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 933.780 Section 933.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  18. 30 CFR 905.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 905.784 Section 905.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  19. 30 CFR 933.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 933.784 Section 933.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  20. 30 CFR 921.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 921.784 Section 921.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  1. Exploring Graduate Students’ Attitudes towards Team Research and Their Scholarly Productivity: A Survey Guided by the Theory of Planned Behavior

    Directory of Open Access Journals (Sweden)

    Tianlan Wei

    2015-01-01

    Full Text Available This study explores the attitudinal and motivational factors underlying graduate students’ attitudes towards team research. Guided by the Theory of Planned Behavior, we hypothesize that attitude, subjective norm, and perceived behavioral control are three major determinants of graduate students’ intentions to conduct team research. An instrument was developed to measure the influences of these factors on students’ intentions and relevant scholarly productivity. A total of 281 graduate students from a large, comprehensive university in the southwest United States participated in the survey. Descriptive statistics reveal that around two-thirds of graduate students have no co-authored manuscripts submitted for publication since they started graduate school. Factor analyses validated the factor structure of the instrument, and the results of Structural Equation Modeling show that (a graduate students’ attitudes towards team research have a positive correlation with their attitudes towards individual research; (b attitude towards team research, subjective norm, and perceived behavioral control, along with students’ discipline/major areas and classification, account for 58% of the variance in the intention to conduct team research; and (c subjective norm appears to be the most influential factor in the model, followed by attitude; while perceived behavioral control is not of much importance. These findings provide implications for academic departments and programs to promote graduate students’ team research. Specifically, creating a climate for collaborative research in academic programs/disciplines/universities may work jointly with enhancing students’ appraisals of such collaborations.

  2. Promoting compliance at DOE: Tiger team assessments and environmental audits

    International Nuclear Information System (INIS)

    Green, R.S.; Crawford, V.I.

    1993-01-01

    The Office of Environmental Audit, within the Department of Energy's Office of Environment, Safety and Health, has effected positive environmental results across the DOE complex. Beginning in the mid 1980's, a concerted effort was established by DOE upper management to achieve environmental consciousness and responsibility. The Office of Environmental Audit was established to conduct and Environmental survey to define environmental problems caused by 40 years of operation at DOE production and research facilities. The Office provided initial identification of DOE sites requiring environmental restoration and assured plans were developed to address these environmental problems. Initiated by massive problems in the environmental operations at DOE's Rocky Flats Plant in Colorado, Tiger Team Assessments (TTA) followed. TTAs established a compliance baseline and evaluated management with respect to environment, safety, and health. The Tiger Teams assured plans were established to correct deficiencies including root causes. As part of this comprehensive effort, the Office of Environmental Audit led the environmental component of the TTAs. With TTAs completed, the Office's future vision entails addressing new environmental regulations and world changes affecting DOE operations. To proactively continue its efforts to effect positive environmental change, the Office is headed toward a comprehensive cross-cutting program that conducts environmental management assessments, reassesses the environmental progress of formerly audited facilities, and evaluates special focuses environmental issues that span across the DOE complex. Through these efforts, the Office of Environmental Audit will determine the environmental activities which address environmental problems and identify environmental problems requiring resolution. Following trending analyses, the Office will disseminate information describing mechanisms to pursue and pitfalls to avoid to achieve environmental excellence

  3. Probabilistic tools for planning and operating power systems with distributed energy storage

    DEFF Research Database (Denmark)

    Klöckl, Bernd; Papaefthymiou, George; Pinson, Pierre

    2008-01-01

    Stochastic energy flows are an increasingly important phenomenon in today's power system planning and operation. They are – among other reasons – caused by large amounts of stochastic generation such as wind. The inclusion of energy storage devices, distributed in future systems (distributed energy...... owners are either the grid operators, the generation owners, or the energy traders. For the grid operators being the DES owners, storage operation will have to be integrated into the planning of the system, therefore multivariate nonparametric time series analysis and synthesis methods have to be applied...... to recorded data of stochastic energy resources. Together with suited storage models, the implications of DES on the planning of the system can then be assessed. For the producers or traders being the owners of the DES, the topic to be addressed is the real-time operation of each storage device in the power...

  4. 30 CFR 937.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 937.784 Section 937.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  5. 30 CFR 942.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 942.780 Section 942.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  6. 30 CFR 912.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 912.780 Section 912.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  7. 30 CFR 939.780 - Surface mining permit applications-minimum requirements for reclamation and operations plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operations plan. 939.780 Section 939.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operations plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  8. 30 CFR 905.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 905.780 Section 905.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  9. 30 CFR 947.780 - Surface mining permit application-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 947.780 Section 947.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Application—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  10. 30 CFR 910.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 910.780 Section 910.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  11. 30 CFR 922.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 922.780 Section 922.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  12. 30 CFR 903.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 903.780 Section 903.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application to conduct...

  13. 30 CFR 912.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 912.784 Section 912.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  14. 30 CFR 937.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 937.780 Section 937.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  15. 30 CFR 941.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 941.780 Section 941.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  16. Team performance modeling for HRA in dynamic situations

    International Nuclear Information System (INIS)

    Shu Yufei; Furuta, Kazuo; Kondo, Shunsuke

    2002-01-01

    This paper proposes a team behavior network model that can simulate and analyze response of an operator team to an incident in a dynamic and context-sensitive situation. The model is composed of four sub-models, which describe the context of team performance. They are task model, event model, team model and human-machine interface model. Each operator demonstrates aspects of his/her specific cognitive behavior and interacts with other operators and the environment in order to deal with an incident. Individual human factors, which determine the basis of communication and interaction between individuals, and cognitive process of an operator, such as information acquisition, state-recognition, decision-making and action execution during development of an event scenario are modeled. A case of feed and bleed operation in pressurized water reactor under an emergency situation was studied and the result was compared with an experiment to check the validity of the proposed model

  17. Solid waste operations complex engineering verification program plan

    International Nuclear Information System (INIS)

    Bergeson, C.L.

    1994-01-01

    This plan supersedes, but does not replace, the previous Waste Receiving and Processing/Solid Waste Engineering Development Program Plan. In doing this, it does not repeat the basic definitions of the various types or classes of development activities nor provide the rigorous written description of each facility and assign the equipment to development classes. The methodology described in the previous document is still valid and was used to determine the types of verification efforts required. This Engineering Verification Program Plan will be updated on a yearly basis. This EVPP provides programmatic definition of all engineering verification activities for the following SWOC projects: (1) Project W-026 - Waste Receiving and Processing Facility Module 1; (2) Project W-100 - Waste Receiving and Processing Facility Module 2A; (3) Project W-112 - Phase V Storage Facility; and (4) Project W-113 - Solid Waste Retrieval. No engineering verification activities are defined for Project W-112 as no verification work was identified. The Acceptance Test Procedures/Operational Test Procedures will be part of each project's Title III operation test efforts. The ATPs/OTPs are not covered by this EVPP

  18. 10 CFR 63.161 - Emergency plan for the geologic repository operations area through permanent closure.

    Science.gov (United States)

    2010-01-01

    ... Planning Criteria § 63.161 Emergency plan for the geologic repository operations area through permanent... 10 Energy 2 2010-01-01 2010-01-01 false Emergency plan for the geologic repository operations area... may occur at the geologic repository operations area, at any time before permanent closure and...

  19. Review Team Focused Modeling Analysis of Radial Collector Well Operation on the Hypersaline Groundwater Plume beneath the Turkey Point Site near Homestead, Florida

    Energy Technology Data Exchange (ETDEWEB)

    Oostrom, Martinus [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Vail, Lance W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-08-01

    Researchers at Pacific Northwest National Laboratory served as members of a U.S. Nuclear Regulatory Commission review team for the Florida Power & Light Company’s application for two combined construction permits and operating licenses (combined licenses or COLs) for two proposed new reactor units—Turkey Point Units 6 and 7. The review team evaluated the environmental impacts of the proposed action based on the October 29, 2014 revision of the COL application, including the Environmental Report, responses to requests for additional information, and supplemental information. As part of this effort, team members tasked with assessing the environmental effects of proposed construction and operation of Units 6 and 7 at the Turkey Point site reviewed two separate modeling studies that analyzed the interaction between surface water and groundwater that would be altered by the operation of radial collector wells (RCWs) at the site. To further confirm their understanding of the groundwater hydrodynamics and to consider whether certain actions, proposed after the two earlier modeling studies were completed, would alter the earlier conclusions documented by the review team in their draft environmental impact statement (EIS; NRC 2015), a third modeling analysis was performed. The third modeling analysis is discussed in this report.

  20. 2014 Zero Waste Strategic Plan Executive Summary.

    Energy Technology Data Exchange (ETDEWEB)

    Wrons, Ralph J.

    2016-05-01

    Sandia National Laboratories/New Mexico is located in Albuquerque, New Mexico, primarily on Department of Energy (DOE) permitted land on approximately 2,800 acres of Kirtland Air Force Base. There are approximately 5.5 million square feet of buildings, with a workforce of approximately 9200 personnel. Sandia National Laboratories Materials Sustainability and Pollution Prevention (MSP2) program adopted in 2008 an internal team goal for New Mexico site operations for Zero Waste to Landfill by 2025. Sandia solicited a consultant to assist in the development of a Zero Waste Strategic Plan. The Zero Waste Consultant Team selected is a partnership of SBM Management Services and Gary Liss & Associates. The scope of this Plan is non-hazardous solid waste and covers the life cycle of material purchases to the use and final disposal of the items at the end of their life cycle.

  1. 18 CFR 376.209 - Procedures during periods of emergency requiring activation of the Continuity of Operations Plan.

    Science.gov (United States)

    2010-04-01

    ... periods of emergency requiring activation of the Continuity of Operations Plan. 376.209 Section 376.209... of the Continuity of Operations Plan. (a)(1) The Commission's Continuity of Operations Plan is...) During periods when the Continuity of Operations Plan is activated, the Commission will continue to act...

  2. Concept mapping to improve team work, team learning and care of the person with dementia and behavioural and psychological symptoms.

    Science.gov (United States)

    Aberdeen, Suzanne M; Byrne, Graeme

    2018-04-01

    The incidence of behavioural and psychological symptoms of dementia in residential aged care facilities is high. Effective team work and knowledgeable staff are cited as important facilitators of appropriate care responses to clients with these symptoms, but to achieve this within a resource-poor workplace can be challenging. In the study reported in this paper, concept mapping was trialled to enhance multifocal person-centred assessment and care planning as well as team learning. The outcomes of team concept mapping were evaluated using a quasi-experimental design with pre- and post-testing in 11 selected Australian residential aged care facilities , including two control residential aged care facilities , over a nine-month period. It was demonstrated that use of concept mapping improved team function, measured as effectiveness of care planning, as well as enhancing learning, with increased knowledge of dementia care even amongst staff who were not directly involved with the process. It is suggested that these results may be generalizable to other countries and care settings.

  3. Capital planning for operating theatres based on projecting future theatre requirements.

    Science.gov (United States)

    Sheehan, Jennifer A; Tyler, Peter; Jayasinha, Hirani; Meleady, Kathleen T; Jones, Neill

    2011-05-01

    During 2006, NSW and ACT Health Departments jointly engaged KPMG to develop an Operating Theatre Requirements' Projection Model and an accompanying planning guideline. A research scan was carried out to identify drivers of surgical demand, theatre capacity and theatre performance, as well as locating existing approaches to modelling operating theatre requirements for planning purposes. The project delivered a Microsoft Excel-based model for projecting future operating theatre requirements, together with an accompanying guideline for use of the model and interpretation of its outputs. It provides a valuable addition to the suite of tools available to Health staff for service and capital planning. The model operates with several limitations, largely due to being data dependent, and the state and completeness of available theatre activity data. However, the operational flexibility built into the model allows users to compensate for these limitations, on a case by case basis, when the user has access to suitable, local data. The design flexibility of the model means that updating the model as improved data become available is not difficult; resulting in revisions being able to be made quickly, and disseminated to users rapidly.

  4. Issues for the Traveling Team Physician.

    Science.gov (United States)

    Kaeding, Christopher C; Borchers, James

    2016-07-01

    This article outlines the value of having the team physician traveling with athletes to away venues for competitions or training sessions. At present, this travel presents several issues for the team physician who crosses state lines for taking care of the athletes. In this article, these issues and their possible remedies are discussed. A concern for the travelling team physician is practicing medicine while caring for the team in a state where the physician is not licensed. Another issue can be the transportation of controlled substances in the course of providing optimal care for the team athletes. These two issues are regulatory and legislative issues at both the state and federal levels. On the practical side of being a team physician, the issues of emergency action plans, supplies, and when to transport injured or ill patients are also reviewed. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  5. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Pohan, Vivi Gusrini Rahmadani; Ancok, Djamaludin

    2010-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  6. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Vivi Gusrini Rahmadani Pohan; Djamaludin Ancok

    2015-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  7. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    International Nuclear Information System (INIS)

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume

  8. Tianwan nuclear power plant operation and management practices

    International Nuclear Information System (INIS)

    Gu Yingbing

    2010-01-01

    Tianwan Nuclear Power Station is a high-tech cooperation project in nuclear sector in the spirit of promoting the political relationship, economic trading and international strategic partnership between China and Russia. It was listed as one of the key nuclear projects to be constructed during the 'Ninth Five-Year' Plan. In this article the author summarizes and feedbacks the practices of operation management in Tianwan Nuclear Power Station in 7 aspects of safety culture construction, operation team building, daily operation management, operation document management, plant chemistry control and management, solid, liquid and gaseous waste management and control of operation performance indicators. (author)

  9. Tiger Team Assessment of the Fermi National Accelerator Laboratory

    International Nuclear Information System (INIS)

    1992-06-01

    This draft report documents the Tiger Team Assessment of the Fermi National Accelerator Laboratory (Fermilab) located in Batavia, Illinois. Fermilab is a program-dedicated national laboratory managed by the Universities Research Association, Inc. (URA) for the US Department of Energy (DOE). The Tiger Team Assessment was conducted from May 11 to June 8, 1992, under the auspices of DOE's Office of Special Projects (OSP) under the Office of the Assistant Secretary for Environment, Safety and Health (EH). The assessment was comprehensive, encompassing environmental, safety and health (ES ampersand H), and quality assurance (QA) disciplines; site remediation; facilities management; and waste management operations. Compliance with applicable Federal , State of Illinois, and local regulations; applicable DOE Orders; best management practices; and internal Fermilab requirements was addressed. In addition, an evaluation of the effectiveness of DOE and Fermilab management of the ES ampersand H/QA and self-assessment programs was conducted. The Fermilab Tiger Team Assessment is part a larger, comprehensive DOE Tiger Team Independent Assessment Program planned for DOE facilities. The objective of the initiative is to provide the Secretary of Energy with information on the compliance status of DOE facilities with regard to ES ampersand H requirements, root causes for noncompliance, adequacy of DOE and contractor ES ampersand H management programs, response actions to address the identified problem areas, and DOE-wide ES ampersand H compliance trends and root causes

  10. Runway Operations Planning: A Two-Stage Heuristic Algorithm

    Science.gov (United States)

    Anagnostakis, Ioannis; Clarke, John-Paul

    2003-01-01

    The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, can also be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. This paper introduces a two stage heuristic algorithm for solving the Runway Operations Planning (ROP) problem. In the first stage, sequences of departure class slots and runway crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program with a Branch & Bound algorithm implementation. Preliminary results from this implementation of the two-stage algorithm on real-world traffic data are presented.

  11. An Efficient Missile Loadout Planning Tool for Operational Planners

    Science.gov (United States)

    2017-06-01

    dictionaries to access values for penalties and feasibility checks. VBA user-defined types are created to identify the base set of missions and base...Missile Defense TLAM Tomahawk Land Attack Missiles TSC Tomahawk Strike Coordinator USN United States Navy VBA Visual Basic for Applications VLP... accessible and usable form, we can start basing our loadouts on actual operational plans (OPLAN) and concept plans (CONPLAN). This will give fleet

  12. Integrated management of operations in Santos Basin: methodology applied to a new philosophy of operations

    Energy Technology Data Exchange (ETDEWEB)

    Pereira, Leandro Leonardo; Lima, Claudio Benevenuto de Campos [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Derenzi Neto, Dario [Accenture, Rio de Janeiro, RJ (Brazil); Pinto, Vladimir Steffen [Soda IT, Rio de Janeiro, RJ (Brazil); Lima, Gilson Brito Alves [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2012-07-01

    The objective of this paper is to present the methodology used to develop the Integrated Management of Operations (GIOp) project in Santos Basin Operational Unit (UO-BS) in the South-Southeast Exploration and Production area of PETROBRAS. The following text describes how the activities were carried out to gather improvements opportunities and to design To-Be processes, considering the challenging environment of the Santos Basin in the coming years. At the end of more than 12 months of work, more than 50 processes and sub-processes were redesigned, involving a multidisciplinary team in the areas of operations, maintenance, safety, health and environment, flow assurance, wells, reservoirs and planning. (author)

  13. A scientific operations plan for the NASA space telescope. [ground support systems, project planning

    Science.gov (United States)

    West, D. K.; Costa, S. R.

    1975-01-01

    A ground system is described which is compatible with the operational requirements of the space telescope. The goal of the ground system is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of space telescope science, or jeopardizing the safety of the space telescope in orbit. The resulting system is able to accomplish this goal through optimum use of existing and planned resources and institutional facilities. Cost is also reduced and efficiency in operation increased by drawing on existing experience in interfacing guest astronomers with spacecraft as well as mission control experience obtained in the operation of present astronomical spacecraft.

  14. [Costs with personnel and productivity analysis of family health program teams in Fortaleza, Ceará].

    Science.gov (United States)

    Rocha Filho, Fernando dos Santos; da Silva, Marcelo Gurgel Carlos

    2009-01-01

    The research verified the productivity and the operational personnel costs of eight teams of the Family Health Program (PSF) of two Basic Units of Family Health (UBASF) in Fortaleza, Ceará, through the methodology of costs by absorption, in 2004. The largest expenses were with personnel (75%), mainly with the PSF teams, and medicines (18%). The federal allocations received in September, 2004, by each PSF team, were R$ 9,543.33. The total cost by team was R$ 15,719.00. Some professionals of various PSF teams showed productivity above the set objectives, but the average productivity by doctor and nurse was below fifty per cent of objectives, with high idle time making the work onerous. The unity cost of home visits by doctor and prenatal attendance by nurses were checked, and, would be less expensive if the idle time were reduced. Various alternatives of cost reduction were observed, such as scale savings of some resources and services and re-negotiation of contracts with suppliers and cooperatives. The data obtained will contribute to more accurate planning for the installation and maintenance of PSF teams as well as alternatives of cost reductions, higher productivity, and better quality.

  15. Creating virtual humans for simulation-based training and planning

    Energy Technology Data Exchange (ETDEWEB)

    Stansfield, S.; Sobel, A.

    1998-05-12

    Sandia National Laboratories has developed a distributed, high fidelity simulation system for training and planning small team Operations. The system provides an immersive environment populated by virtual objects and humans capable of displaying complex behaviors. The work has focused on developing the behaviors required to carry out complex tasks and decision making under stress. Central to this work are techniques for creating behaviors for virtual humans and for dynamically assigning behaviors to CGF to allow scenarios without fixed outcomes. Two prototype systems have been developed that illustrate these capabilities: MediSim, a trainer for battlefield medics and VRaptor, a system for planning, rehearsing and training assault operations.

  16. Application of Grid Planning Method in Drilling-Blasting Operations

    OpenAIRE

    Dambov, Risto; Spasovski, Orce

    2012-01-01

    The problem occurs almost every day in operation and causes troubles to mining engineers. The right performance of drilling-blasting work is important for the successful operation of the entire excavation. The aim of the paper is to point out the importance of planning and how it can contribute to the right organization and make drilling-blasting and other mining activities in mine operations easier. Defining the activities and practical example that has been given are carried out by the u...

  17. Distributed situation awareness in complex collaborative systems: A field study of bridge operations on platform supply vessels.

    Science.gov (United States)

    Sandhåland, Hilde; Oltedal, Helle A; Hystad, Sigurd W; Eid, Jarle

    2015-06-01

    This study provides empirical data about shipboard practices in bridge operations on board a selection of platform supply vessels (PSVs). Using the theoretical concept of distributed situation awareness, the study examines how situation awareness (SA)-related information is distributed and coordinated at the bridge. This study thus favours a systems approach to studying SA, viewing it not as a phenomenon that solely happens in each individual's mind but rather as something that happens between individuals and the tools that they use in a collaborative system. Thus, this study adds to our understanding of SA as a distributed phenomenon. Data were collected in four field studies that lasted between 8 and 14 days on PSVs that operate on the Norwegian continental shelf and UK continental shelf. The study revealed pronounced variations in shipboard practices regarding how the bridge team attended to operational planning, communication procedures, and distracting/interrupting factors during operations. These findings shed new light on how SA might decrease in bridge teams during platform supply operations. The findings from this study emphasize the need to assess and establish shipboard practices that support the bridge teams' SA needs in day-to-day operations. Provides insights into how shipboard practices that are relevant to planning, communication and the occurrence of distracting/interrupting factors are realized in bridge operations.Notes possible areas for improvement to enhance distributed SA in bridge operations.

  18. Komplikationer i forbindelse med kejsersnit i elektivt sectio-team

    DEFF Research Database (Denmark)

    Bülow-Lehnsby, Anne Lene; Grønbeck, Lene; Krebs, Lone

    2006-01-01

    INTRODUCTION: Two Danish hospitals have introduced a new organizing structure according to which planned caesarean sections are performed by a team. Caesareans are normally carried out without complications, and this makes it possible to evaluate complications to the surgery isolatedly. The object...... of this article was to describe the medical complications in mother and child of planned caesarean section performed in team. MATERIALS AND METHODS: A total of 534 caesarean sections were performed in team in 2004. Information on complications to caesarean sections was obtained from medical records. RESULTS......: The most frequent complication was blood loss of more than 1000 millilitres occurring in 2,2%. Other complications occurred with frequencies of about or less than 1%. 7% of the patients experienced a complication to caesarean performed in team. Respiratory morbidity occurred in 3.2% of the infants...

  19. Correlation analysis between team communication characteristics and frequency of inappropriate communications

    International Nuclear Information System (INIS)

    Kim, Ar Ryum; Lee, Seung Woo; Park, Jinkyun; Kang, Hyun Gook; Seong, Poong Hyun

    2013-01-01

    Highlights: • We proposed a method to evaluate team communication characteristics based on social network analysis. • We compare team communication characteristics with the frequency of inappropriate communications. • Frequency of inappropriate communications were decreased when more operators perform the same types of role as others. • Frequency of inappropriate communications were decreased for teams who provide more number of acknowledgment. - Abstract: The characteristics of team communications are important since large process systems such as nuclear power plants, airline, and railways are operated by operating teams. In such situation, inappropriate communications can cause a lack of situational information and lead to serious consequences for the systems. As a result, the communication characteristics of operating teams should be understood in order to extract meaningful insights to address the nature of inappropriate communications. The purpose of this study was to develop a method to evaluate the characteristics of team communications based on social network analysis and compare them with the frequency of inappropriate communications. In order to perform the analysis, verbal protocol data, which were audio-visual recorded under training sessions by operating teams, were used and interfacing system loss of coolant accident scenarios were selected. As a result of the study, it was found that the frequency of inappropriate communications decreased when more operators perform the same types of role as other operators, since they can easily and effectively back up each other. Also, the frequency of inappropriate communication is decreased for teams which provide a relatively large communication content that acknowledge or confirm another communication content

  20. Simultaneous surgeries in a split forward surgical team: a case study.

    Science.gov (United States)

    Vanfosson, Christopher A; Seery, Jason M

    2011-12-01

    The 541st Forward Surgical Team performed split-based operations, with one site in the city of Pol-e-Khumri. One evening, the 10-person team received two pediatric patients simultaneously and conducted simultaneous surgeries. The 3-year-old female sustained severe injuries to bilateral lower extremities and a puncture wound to her right forearm. The 13-year-old sustained fragmentary wounds to her left hand, left foot, right medial calf, and evisceration to her left lower quadrant. The patients presented in extremis after being taken to a civilian hospital initially, spending approximately 1.5 hours receiving no resuscitative therapy. The 3-year-old underwent amputations of bilateral lower extremities and a fasciotomy of the right forearm. The 13-year-old survived an exploratory laparotomy and irrigation and debridement of intra-abdominal wounds. The successful completion of simultaneous surgeries, by a split forward surgical team at a remote location, for two critically ill patients is possible. It should not become the standard of care. Prior planning made this occurrence feasible and safer, but such situations put the patients at risk for complications.

  1. Collective efficacy in a high-fidelity simulation of an airline operations center

    Science.gov (United States)

    Jinkerson, Shanna

    This study investigated the relationships between collective efficacy, teamwork, and team performance. Participants were placed into teams, where they worked together in a high-fidelity simulation of an airline operations center. Each individual was assigned a different role to represent different jobs within an airline (Flight Operations Coordinator, Crew Scheduling, Maintenance, Weather, Flight Scheduling, or Flight Planning.) Participants completed a total of three simulations with an After Action Review between each. Within this setting, both team performance and teamwork behaviors were shown to be positively related to expectations for subsequent performance (collective efficacy). Additionally, teamwork and collective efficacy were not shown to be concomitantly related to subsequent team performance. A chi-square test was used to evaluate existence of performance spirals, and they were not supported. The results of this study were likely impacted by lack of power, as well as a lack of consistency across the three simulations.

  2. National volcanic ash operations plan for aviation

    Science.gov (United States)

    ,; ,

    2007-01-01

    The National Aviation Weather Program Strategic Plan (1997) and the National Aviation Weather Initiatives (1999) both identified volcanic ash as a high-priority informational need to aviation services. The risk to aviation from airborne volcanic ash is known and includes degraded engine performance (including flameout), loss of visibility, failure of critical navigational and operational instruments, and, in the worse case, loss of life. The immediate costs for aircraft encountering a dense plume are potentially major—damages up to $80 million have occurred to a single aircraft. Aircraft encountering less dense volcanic ash clouds can incur longer-term costs due to increased maintenance of engines and external surfaces. The overall goal, as stated in the Initiatives, is to eliminate encounters with ash that could degrade the in-flight safety of aircrews and passengers and cause damage to the aircraft. This goal can be accomplished by improving the ability to detect, track, and forecast hazardous ash clouds and to provide adequate warnings to the aviation community on the present and future location of the cloud. To reach this goal, the National Aviation Weather Program established three objectives: (1) prevention of accidental encounters with hazardous clouds; (2) reduction of air traffic delays, diversions, or evasive actions when hazardous clouds are present; and (3) the development of a single, worldwide standard for exchange of information on airborne hazardous materials. To that end, over the last several years, based on numerous documents (including an OFCMsponsored comprehensive study on aviation training and an update of Aviation Weather Programs/Projects), user forums, and two International Conferences on Volcanic Ash and Aviation Safety (1992 and 2004), the Working Group for Volcanic Ash (WG/VA), under the OFCM-sponsored Committee for Aviation Services and Research, developed the National Volcanic Ash Operations Plan for Aviation and Support of the

  3. Performance expectation plan

    Energy Technology Data Exchange (ETDEWEB)

    Ray, P.E.

    1998-09-04

    This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.

  4. Managing Inclusiveness and Diversity in Teams: How Leader Inclusiveness Affects Performance through Status and Team Identity

    OpenAIRE

    Mitchell, Rebecca; Boyle, Brendan; Parker, Vicki; Giles, Michelle; Chiang, Vico; Joyce, Pauline

    2015-01-01

    While there is increasing pressure to work collaboratively in interprofessional teams, health professionals often continue to operate in uni-professional silos. Leader inclusiveness is directed toward encouraging and valuing the different viewpoints of diverse members within team interactions, and has significant potential to overcome barriers to interprofessional team performance. In order to better understand the influence of leader inclusiveness, we develop and investigate a model of its e...

  5. A Data Scheduling and Management Infrastructure for the TEAM Network

    Science.gov (United States)

    Andelman, S.; Baru, C.; Chandra, S.; Fegraus, E.; Lin, K.; Unwin, R.

    2009-04-01

    The objective of the Tropical Ecology Assessment and Monitoring Network (www.teamnetwork.org) is "To generate real time data for monitoring long-term trends in tropical biodiversity through a global network of TEAM sites (i.e. field stations in tropical forests), providing an early warning system on the status of biodiversity to effectively guide conservation action". To achieve this, the TEAM Network operates by collecting data via standardized protocols at TEAM Sites. The standardized TEAM protocols include the Climate, Vegetation and Terrestrial Vertebrate Protocols. Some sites also implement additional protocols. There are currently 7 TEAM Sites with plans to grow the network to 15 by June 30, 2009 and 50 TEAM Sites by the end of 2010. Climate Protocol The Climate Protocol entails the collection of climate data via meteorological stations located at the TEAM Sites. This includes information such as precipitation, temperature, wind direction and strength and various solar radiation measurements. Vegetation Protocol The Vegetation Protocol collects standardized information on tropical forest trees and lianas. A TEAM Site will have between 6-9 1ha plots where trees and lianas larger than a pre-specified size are mapped, identified and measured. This results in each TEAM Site repeatedly measuring between 3000-5000 trees annually. Terrestrial Vertebrate Protocol The Terrestrial Vertebrate Protocol collects standardized information on mid-sized tropical forest fauna (i.e. birds and mammals). This information is collected via camera traps (i.e. digital cameras with motion sensors housed in weather proof casings). The images taken by the camera trap are reviewed to identify what species are captured in the image by the camera trap. The image and the interpretation of what is in the image are the data for the Terrestrial Vertebrate Protocol. The amount of data collected through the TEAM protocols provides a significant yet exciting IT challenge. The TEAM Network is

  6. Nevada test site radionuclide inventory and distribution: project operations plan

    International Nuclear Information System (INIS)

    Kordas, J.F.; Anspaugh, L.R.

    1982-01-01

    This document is the operational plan for conducting the Radionuclide Inventory and Distribution Program (RIDP) at the Nevada Test Site (NTS). The basic objective of this program is to inventory the significant radionuclides of NTS origin in NTS surface soil. The expected duration of the program is five years. This plan includes the program objectives, methods, organization, and schedules

  7. 1997 Operating plan for the Office of International Health Programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    One year ago, the Office of International Health Programs provided you with our 1996 Operating Plan, which defined our ideas and ideals for conducting business in 1996. We have again this year undertaken an intensive planning effort, first reviewing our accomplishments and shortcomings during 1996, and then developing plans and priorities for the upcoming year, taking into account input from customers and outside review panels, and ensuring that the demands on the office have been balanced with anticipated human, financial, and material resources.

  8. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  9. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are 99 Tc and 60 Co for underwater affected by past discharges to the 216-BY Cribs, and 90 Sr, 239/240 Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes

  10. Development of a Space Station Operations Management System

    Science.gov (United States)

    Brandli, A. E.; McCandless, W. T.

    To enhance the productivity of operations aboard the Space Station, a means must be provided to augment, and frequently to supplant, human effort in support of mission operations and management, both on the ground and onboard. The Operations Management System (OMS), under development at the Johnson Space Center, is one such means. OMS comprises the tools and procedures to facilitate automation of station monitoring, control, and mission planning tasks. OMS mechanizes, and hence rationalizes, execution of tasks traditionally performed by mission planners, the mission control center team, onboard System Management software, and the flight crew.

  11. Development of a Space Station Operations Management System

    Science.gov (United States)

    Brandli, A. E.; Mccandless, W. T.

    1988-01-01

    To enhance the productivity of operations aboard the Space Station, a means must be provided to augment, and frequently to supplant, human effort in support of mission operations and management, both on the ground and onboard. The Operations Management System (OMS), under development at the Johnson Space Center, is one such means. OMS comprises the tools and procedures to facilitate automation of station monitoring, control, and mission planning tasks. OMS mechanizes, and hence rationalizes, execution of tasks traditionally performed by mission planners, the mission control center team, onboard System Management software, and the flight crew.

  12. Microgrids and distributed generation systems: Control, operation, coordination and planning

    Science.gov (United States)

    Che, Liang

    Distributed Energy Resources (DERs) which include distributed generations (DGs), distributed energy storage systems, and adjustable loads are key components in microgrid operations. A microgrid is a small electric power system integrated with on-site DERs to serve all or some portion of the local load and connected to the utility grid through the point of common coupling (PCC). Microgrids can operate in both grid-connected mode and island mode. The structure and components of hierarchical control for a microgrid at Illinois Institute of Technology (IIT) are discussed and analyzed. Case studies would address the reliable and economic operation of IIT microgrid. The simulation results of IIT microgrid operation demonstrate that the hierarchical control and the coordination strategy of distributed energy resources (DERs) is an effective way of optimizing the economic operation and the reliability of microgrids. The benefits and challenges of DC microgrids are addressed with a DC model for the IIT microgrid. We presented the hierarchical control strategy including the primary, secondary, and tertiary controls for economic operation and the resilience of a DC microgrid. The simulation results verify that the proposed coordinated strategy is an effective way of ensuring the resilient response of DC microgrids to emergencies and optimizing their economic operation at steady state. The concept and prototype of a community microgrid that interconnecting multiple microgrids in a community are proposed. Two works are conducted. For the coordination, novel three-level hierarchical coordination strategy to coordinate the optimal power exchanges among neighboring microgrids is proposed. For the planning, a multi-microgrid interconnection planning framework using probabilistic minimal cut-set (MCS) based iterative methodology is proposed for enhancing the economic, resilience, and reliability signals in multi-microgrid operations. The implementation of high-reliability microgrids

  13. Radiation safety analysis and action plans for NSRRC top-up operation

    International Nuclear Information System (INIS)

    Wang, J.-P.; Sheu, R.-J.; Liu, Joseph C.; Chen, C.-R.; Chang, F.-D.; Kao, S.-P.

    2006-01-01

    This paper summarizes the radiation safety analysis and action plans for the upcoming top-up operation at the National Synchrotron Radiation Research Center (NSRRC). Electron beam loss scenarios and consequence of beam lifetime and injection efficiency have been studied. Dose assessment was conducted based on measurement and Monte Carlo simulation results. Radiation safety action plans such as upgrading the shielding of the injection section, enlarging the exclusion zones of the straight section beamlines, installing new interlock system for top-up operation and most importantly improving the injection efficiency have been scheduled. The goal is to keep present dose limit of 2 mSv/y and make top-up operation feasible at normal user's run of year 2006

  14. Tiger Team assessment of the Lawrence Berkeley Laboratory, Washington, DC

    Energy Technology Data Exchange (ETDEWEB)

    1991-02-01

    This report documents the results of the Department of Energy's (DOE's) Tiger Team Assessment of the Lawrence Berkeley Laboratory (LBL) conducted from January 14 through February 15, 1991. The purpose of the assessment was to provide the Secretary of Energy with the status of environment, safety, and health (ES H) programs at LBL. The Tiger Team concluded that curtailment of cessation of any operations at LBL is not warranted. However, the number and breadth of findings and concerns from this assessment reflect a serious condition at this site. In spite of its late start, LBL has recently made progress in increasing ES H awareness at all staff levels and in identifying ES H deficiencies. Corrective action plans are inadequate, however, many compensatory actions are underway. Also, LBL does not have the technical expertise or training programs nor the tracking and followup to effectively direct and control sitewide guidance and oversight by DOE of ES H activities at LBL. As a result of these deficiencies, the Tiger Team has reservations about LBL's ability to implement effective actions in a timely manner and, thereby, achieve excellence in their ES H program. 4 figs., 24 tabs.

  15. Tiger Team assessment of the Lawrence Berkeley Laboratory, Washington, DC

    International Nuclear Information System (INIS)

    1991-02-01

    This report documents the results of the Department of Energy's (DOE's) Tiger Team Assessment of the Lawrence Berkeley Laboratory (LBL) conducted from January 14 through February 15, 1991. The purpose of the assessment was to provide the Secretary of Energy with the status of environment, safety, and health (ES ampersand H) programs at LBL. The Tiger Team concluded that curtailment of cessation of any operations at LBL is not warranted. However, the number and breadth of findings and concerns from this assessment reflect a serious condition at this site. In spite of its late start, LBL has recently made progress in increasing ES ampersand H awareness at all staff levels and in identifying ES ampersand H deficiencies. Corrective action plans are inadequate, however, many compensatory actions are underway. Also, LBL does not have the technical expertise or training programs nor the tracking and followup to effectively direct and control sitewide guidance and oversight by DOE of ES ampersand H activities at LBL. As a result of these deficiencies, the Tiger Team has reservations about LBL's ability to implement effective actions in a timely manner and, thereby, achieve excellence in their ES ampersand H program. 4 figs., 24 tabs

  16. Team building: conceptual, methodological, and applied considerations.

    Science.gov (United States)

    Beauchamp, Mark R; McEwan, Desmond; Waldhauser, Katrina J

    2017-08-01

    Team building has been identified as an important method of improving the psychological climate in which teams operate, as well as overall team functioning. Within the context of sports, team building interventions have consistently been found to result in improvements in team effectiveness. In this paper we review the extant literature on team building in sport, and address a range of conceptual, methodological, and applied considerations that have the potential to advance theory, research, and applied intervention initiatives within the field. This involves expanding the scope of team building strategies that have, to date, primarily focused on developing group cohesion. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. Network Operations Support Plan for the Spot 2 mission (revision 1)

    Science.gov (United States)

    Werbitzky, Victor

    1989-01-01

    The purpose of this Network Operations Support Plan (NOSP) is to indicate operational procedures and ground equipment configurations for the SPOT 2 mission. The provisions in this document take precedence over procedures or configurations in other documents.

  18. A motion-planning method for dexterous hand operating a tool based on bionic analysis

    Directory of Open Access Journals (Sweden)

    Wei Bo

    2017-01-01

    Full Text Available In order to meet the needs of robot’s operating tools for different types and sizes, the dexterous hand is studied by many scientific research institutions. However, the large number of joints in a dexterous hand leads to the difficulty of motion planning. Aiming at this problem, this paper proposes a planning method abased on BPNN inspired by human hands. Firstly, this paper analyses the structure and function of the human hand and summarizes its typical strategy of operation. Secondly, based on the manual operation strategy, the tools are classified according to the shape and the operation mode of the dexterous hand is presented. Thirdly, the BPNN is used to train the humanoid operation, and then output the operation plan. Finally, the simulating experiments of grasping simple tools and operating complex tools are made by MATLAB and ADAMS. The simulation verifies the effectiveness of this method.

  19. Towards heterogeneous robot team path planning: acquisition of multiple routes with a modified spline-based algorithm

    Directory of Open Access Journals (Sweden)

    Lavrenov Roman

    2017-01-01

    Full Text Available Our research focuses on operation of a heterogeneous robotic group that carries out point-to point navigation in GPS-denied dynamic environment, applying a combined local and global planning approach. In this paper, we introduce a homotopy-based high-level planner, which uses a modified splinebased path-planning algorithm. The algorithm utilizes Voronoi graph for global planning and a set of optimization criteria for local improvements of selected paths. The simulation was implemented in Matlab environment.

  20. LANDSAT-D ground segment operations plan, revision A

    Science.gov (United States)

    Evans, B.

    1982-01-01

    The basic concept for the utilization of LANDSAT ground processing resources is described. Only the steady state activities that support normal ground processing are addressed. This ground segment operations plan covers all processing of the multispectral scanner and the processing of thematic mapper through data acquisition and payload correction data generation for the LANDSAT 4 mission. The capabilities embedded in the hardware and software elements are presented from an operations viewpoint. The personnel assignments associated with each functional process and the mechanisms available for controlling the overall data flow are identified.

  1. Interdisciplinary collaboration within project-level NEPA teams in the US Forest Service

    Science.gov (United States)

    James W. Freeman; Marc J. Stern; Michael Mortimer; Dale J. Blahna; Lee K. Cerveny

    2011-01-01

    Interdisciplinary teamwork has become a foundation of natural resources planning and management in the US. Yet, we know little about the degree of interdisciplinary collaboration of natural resource planning teams. We conducted 10 case studies of Forest Service NEPA (National Environmental Policy Act) teams working on projects related to the 2005 Travel Management Rule...

  2. Multimodal interaction for human-robot teams

    Science.gov (United States)

    Burke, Dustin; Schurr, Nathan; Ayers, Jeanine; Rousseau, Jeff; Fertitta, John; Carlin, Alan; Dumond, Danielle

    2013-05-01

    Unmanned ground vehicles have the potential for supporting small dismounted teams in mapping facilities, maintaining security in cleared buildings, and extending the team's reconnaissance and persistent surveillance capability. In order for such autonomous systems to integrate with the team, we must move beyond current interaction methods using heads-down teleoperation which require intensive human attention and affect the human operator's ability to maintain local situational awareness and ensure their own safety. This paper focuses on the design, development and demonstration of a multimodal interaction system that incorporates naturalistic human gestures, voice commands, and a tablet interface. By providing multiple, partially redundant interaction modes, our system degrades gracefully in complex environments and enables the human operator to robustly select the most suitable interaction method given the situational demands. For instance, the human can silently use arm and hand gestures for commanding a team of robots when it is important to maintain stealth. The tablet interface provides an overhead situational map allowing waypoint-based navigation for multiple ground robots in beyond-line-of-sight conditions. Using lightweight, wearable motion sensing hardware either worn comfortably beneath the operator's clothing or integrated within their uniform, our non-vision-based approach enables an accurate, continuous gesture recognition capability without line-of-sight constraints. To reduce the training necessary to operate the system, we designed the interactions around familiar arm and hand gestures.

  3. Plan for the Initiation of HA-211 Furnace Operations at the Plutonium Finishing Plan (PFP)

    International Nuclear Information System (INIS)

    WILLIS, H.T.

    2000-01-01

    This plan provides a phased approach authorizing the use of three additional muffle furnaces for thermal stabilization. Achievement of Thermal Stabilization mission elements require the installation and startup of three additional muffle furnaces for the thermal stabilization of plutonium and plutonium bearing materials at the Plutonium Finishing Plant (PFP). The release to operate these additional furnaces will require an Activity Based Startup Review. The conduct of the Activity Based Startup Review (ABSR) was approved by Fluor Daniel Hanford on October 15, 1999. This plan has been developed with the objective of identifying those activities needed to guide the controlled startup of five furnaces from authorization to unrestricted operations by adding the HA-211 furnaces in an orderly and safe manner after the approval to Startup has been given

  4. The Automated Assembly Team contributions to the APRIMED Agile Manufacturing Project

    International Nuclear Information System (INIS)

    Jones, R.E.; Ames, A.L.; Calton, T.L.

    1995-06-01

    The Automated Assembly Team of the APRIMED Project (abbreviated as A') consists of two parts: the Archimedes Project, which is an ongoing project developing automated assembly technology, and the A' Robot Team. Archimedes is a second generation assembly planning system that both provides a general high-level assembly sequencing capability and, for a smaller class of products, facilitates automatic programming of a robotic workcell to assemble them. The A' robot team designed, developed, and implemented a flexible robot workcell which served as the automated factory of the A' project. In this document we briefly describe the role of automated assembly planning in agile manufacturing, and specifically describe the contributions of the Archimedes project and the A' robot team to the A' project. We introduce the concepts of the Archimedes automated assembly planning project, and discuss the enhancements to Archimedes which were developed in response to the needs of the A' project. We also present the work of the A' robot team in designing and developing the A' robot workcell, including all tooling and programming to support assembly of the A' discriminator devices. Finally, we discuss the process changes which these technologies have enabled in the A' project

  5. Occupational therapists in the interdisciplinary team setting.

    Science.gov (United States)

    Reed, S M

    1984-01-01

    The interdisciplinary team approach to patient care provides an answer to the fragmentation and confusion patients feel when dealing with our complex healthcare system. Even though the team approach has been in use for the past two decades, implementation of a successful team is very difficult and rarely sustained over a significant period of time. This is especially true in general hospitals and in physical rehabilitation programs that spring from general hospitals where the physician and the nurse are the traditional care group. Occupational therapists, as they establish roles on interdisciplinary teams as staff members and team leaders, will require a knowledge of what makes a team function effectively. They can use this knowledge to evaluate the status of their own team and contribute to changes that will insure its long-term success. Six key issues should be addressed during the planning stage of any new healthcare team to insure its continued viability. These issues are: program philosophy, client focus, role clarification, collaboration and information sharing, policies and procedures, and staff supportiveness.

  6. Planning a pharmacy-led medical mission trip, part 2: servant leadership and team dynamics.

    Science.gov (United States)

    Brown, Dana A; Brown, Daniel L; Yocum, Christine K

    2012-06-01

    While pharmacy curricula can prepare students for the cognitive domains of pharmacy practice, mastery of the affective aspects can prove to be more challenging. At the Gregory School of Pharmacy, medical mission trips have been highly effective means of impacting student attitudes and beliefs. Specifically, these trips have led to transformational changes in student leadership capacity, turning an act of service into an act of influence. Additionally, building team unity is invaluable to the overall effectiveness of the trip. Pre-trip preparation for teams includes activities such as routine team meetings, team-building activities, and implementation of committees, as a means of promoting positive team dynamics. While in the field, team dynamics can be fostered through activities such as daily debriefing sessions, team disclosure times, and provision of medical services.

  7. Tactical and operational decisions for operating room planning: efficiency and welfare implications.

    Science.gov (United States)

    Testi, Angela; Tànfani, Elena

    2009-12-01

    In this paper, we evaluate the impact on welfare implications of a 0-1 linear programming model to solve the Operating Room (OR) planning problem, taking a patient perspective. In particular, given a General Surgery Department made up of different surgical sub-specialties sharing a given number of OR block times, the model determines, during a given planning period, the allocation of those blocks to surgical sub-specialties, i.e. the so called Master Surgical Schedule Problem (MSSP), together with the subsets of elective patients to be operated on in each block time, i.e. the so called Surgical Case Assignment Problem (SCAP). The innovation of the model is two-fold. The first is that OR allocation is "optimal" if the available OR blocks are scheduled simultaneously to the proper subspecialty, at the proper time to the proper patient. The second is defining what "proper" means and include that in the objective function. In our approach what is important is not number of patients who can be treated in a given period but how much welfare loss, due to clinical deterioration or other negative consequences related to excessive waiting, can be prevented. In other words we assume a societal perspective in that we focus on "outcome" (health improving or preventing from worsening) rather than on "output" (delivered procedures). The model can be used both to develop weekly OR planning with given resources (operational decision), and to perform "what if" scenario analysis regarding how to increase the amount of OR time available for the entire department (tactical decision). The model performance is verified by applying it to a real scenario, the elective admissions of the General Surgery Department of the San Martino University Hospital in Genova (Italy). Despite the complexity of this NP-hard combinatorial optimization problem, computational results indicate that the model can solve all test problems within 600 s and an average optimality tolerance of less than 0.01%.

  8. The Operational Planning Model of Transhipment Processes in the Port

    Directory of Open Access Journals (Sweden)

    Mia Jurjević

    2016-04-01

    Full Text Available Modelling of a traffic system refers to the efficiency of operations for establishing successful business performance by examining the possibilities for its improvement. The main purpose of each container terminal is to ensure continuity and dynamics of the flow of containers. The objective of this paper is to present a method for determining the amount of certain types of containers that can be transhipped at each berth, with the proper cargo handling, taking into account minimum total costs of transhipment. The mathematical model of planning the transhipment and transportation of containers at the terminal is presented. The optimal solution, obtained with the method of linear programming, represents a plan for container deployment that will ensure effective ongoing process of transhipment, providing the lowest transhipment costs. The proposed model, tested in the port of Rijeka, should be the basis for makingadequate business decisions in the operational planning of the container terminal.

  9. Managing team learning in a Spanish commercial bank

    OpenAIRE

    Døving, Erik; Martin-Rubio, Irene

    2013-01-01

    Purpose – The purpose of this paper is to analyze how team management affects team-learning activities. Design/methodology/approach – The authors empirically study 68 teams as they operate in the natural business context of a major Spanish bank. Quantitative research utilizing multiple regression analyses is used to test hypotheses. Findings – The leadership behaviour (consideration, initiation of structure) displayed by the team leader plays a key role in facilitating team learning. Te...

  10. Operating the worldwide LHC computing grid: current and future challenges

    International Nuclear Information System (INIS)

    Molina, J Flix; Forti, A; Girone, M; Sciaba, A

    2014-01-01

    The Wordwide LHC Computing Grid project (WLCG) provides the computing and storage resources required by the LHC collaborations to store, process and analyse their data. It includes almost 200,000 CPU cores, 200 PB of disk storage and 200 PB of tape storage distributed among more than 150 sites. The WLCG operations team is responsible for several essential tasks, such as the coordination of testing and deployment of Grid middleware and services, communication with the experiments and the sites, followup and resolution of operational issues and medium/long term planning. In 2012 WLCG critically reviewed all operational procedures and restructured the organisation of the operations team as a more coherent effort in order to improve its efficiency. In this paper we describe how the new organisation works, its recent successes and the changes to be implemented during the long LHC shutdown in preparation for the LHC Run 2.

  11. KSC ground operations planning for Space Station

    Science.gov (United States)

    Lyon, J. R.; Revesz, W., Jr.

    1993-01-01

    At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.

  12. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.

    1982-02-01

    This NRC Plan, which defines NRC's functional role in cleanup operations at Three Mile Island Unit 2 and outlines NRC's regulatory responsibilities in fulfilling this role, is the first revision to the initial plan issued in July 1980 (NUREG-0698). Since 1980, a number of policy developments have occurred which will have an impact on the course of cleanup operations. This revision reflects these developments in the area of NRC's review and approval process with regard to cleanup operations as well as NRC's interface with the Department of Energy's involvement in the cleanup and waste disposal. This revision is also intended to update the cleanup schedule by presenting the cleanup progress that has taken place and NRC's role in ongoing and future cleanup activities

  13. Care planning for pressure ulcers in hospice: the team effect.

    Science.gov (United States)

    Eisenberger, Andrew; Zeleznik, Jomarie

    2004-09-01

    The standards of care for patients at risk for or with a pressure ulcer in hospitals and nursing homes focus on prevention and ulcer healing using an interdisciplinary approach. Although not a primary hospice condition, pressure ulcers are not uncommon in dying patients. Their management in hospices, particularly the involvement of family caregivers, has not been studied. The objective of this study is to identify the factors that influence care planning for the prevention and treatment of pressure ulcers in hospice patients and develop a taxonomy to use for further study. A telephone survey was conducted with 18 hospice directors of clinical services and 10 direct-care nurses. Descriptive qualitative data analysis using grounded theory was utilized. The following three themes were identified: (1) the primary role of the hospice nurse is an educator rather than a wound care provider; (2) hospice providers perceive the barriers and burdens of family caregiver involvement in pressure ulcer care to be bodily location of the pressure ulcer, unpleasant wound characteristics, fear of causing pain, guilt, and having to acknowledge the dying process when a new pressure ulcer develops; and (3) the "team effect" describes the collaboration between family caregivers and the health care providers to establish individualized achievable goals of care ranging from pressure ulcer prevention to acceptance of a pressure ulcer and symptom palliation. Pressure ulcer care planning is a model of collaborative decision making between family caregivers and hospice providers for a condition that occurs as a secondary condition in hospice. A pressure ulcer places significant burdens on family caregivers distinct from common end-of-life symptoms whose treatment is directed at the patient. Because the goals of pressure ulcer care appear to be individualized for a dying patient and their caregivers, the basis of quality-of-care evaluations should be the process of care rather than the outcome

  14. Foresight for commanders: a methodology to assist planning for effects-based operations

    Science.gov (United States)

    Davis, Paul K.; Kahan, James P.

    2006-05-01

    Looking at the battlespace as a system of systems is a cornerstone of Effects-Based Operations and a key element in the planning of such operations, and in developing the Commander's Predictive Environment. Instead of a physical battleground to be approached with weapons of force, the battlespace is an interrelated super-system of political, military, economic, social, information and infrastructure systems to be approached with diplomatic, informational, military and economic actions. A concept that has proved useful in policy arenas other than defense, such as research and development for information technology, addressing cybercrime, and providing appropriate and cost-effective health care, is foresight. In this paper, we provide an overview of how the foresight approach addresses the inherent uncertainties in planning courses of action, present a set of steps in the conduct of foresight, and then illustrate the application of foresight to a commander's decision problem. We conclude that foresight approach that we describe is consistent with current doctrinal intelligence preparation of the battlespace and operational planning, but represents an advance in that it explicitly addresses the uncertainties in the environment and planning in a way that identifies strategies that are robust over different possible ground truths. It should supplement other planning methods.

  15. Engineering Task Plan to Expand the Environmental Operational Envelope of Core Sampling

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Task Plan authorizes the development of an Alternative Generation and Analysis (AGA). The AGA will determine how to expand the environmental operating envelope during core sampling operations

  16. Enterprise Resource Planning, Operations and Management

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...

  17. IUS/TUG orbital operations and mission support study. Volume 4: Project planning data

    Science.gov (United States)

    1975-01-01

    Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.

  18. NASA strategic plan

    Science.gov (United States)

    1994-01-01

    The NASA Strategic Plan is a living document. It provides far-reaching goals and objectives to create stability for NASA's efforts. The Plan presents NASA's top-level strategy: it articulates what NASA does and for whom; it differentiates between ends and means; it states where NASA is going and what NASA intends to do to get there. This Plan is not a budget document, nor does it present priorities for current or future programs. Rather, it establishes a framework for shaping NASA's activities and developing a balanced set of priorities across the Agency. Such priorities will then be reflected in the NASA budget. The document includes vision, mission, and goals; external environment; conceptual framework; strategic enterprises (Mission to Planet Earth, aeronautics, human exploration and development of space, scientific research, space technology, and synergy); strategic functions (transportation to space, space communications, human resources, and physical resources); values and operating principles; implementing strategy; and senior management team concurrence.

  19. Establishing pharmacy operations in a new hospital while transferring existing operations to new ownership.

    Science.gov (United States)

    Crumb, Deborah J

    2010-04-01

    The process of moving pharmacy services and personnel from an existing hospital to a new hospital while maintaining patient care and operations at both facilities is described. The project management structure for the new hospital is described, including the establishment of a departmental coordination team (DCT) for the pharmacy. The purpose of the pharmacy DCT was to plan and coordinate new hospital move-in and pharmacy operations as well as the transition of the existing hospital to new ownership. The use of action item lists and project scorecards kept the project on schedule and on budget. The pharmacy DCT's action item list, which sorted items into four categories (facilities, equipment, operations, and staffing), was reviewed and updated at the weekly meeting of pharmacy leadership and served as the principal guiding document for the pharmacy DCT. Planning and implementation are described for the areas of operations and workflow, staffing, information technology, materials management, accreditation and licensure, and orientation and training. On the transition day, patients under care by physicians employed by the governing organization were transferred to the new facility while patients under care by community physicians remained at the existing facility under new ownership and new administration. Integral to the successful transition were early planning, the provision of adequate training for all employees, and collaboration among organizations, departments, and individuals. A well-coordinated plan resulted in the successful establishment of pharmacy practice in a new hospital and the transition of an operational pharmacy practice and facility to new ownership while maintaining quality patient care.

  20. Optimal, Risk-based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2008-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based life-cycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue...