WorldWideScience

Sample records for task technical plan

  1. Task technical plan: DWPF air permit/dispersion modeling

    International Nuclear Information System (INIS)

    Lambert, D.P.

    1993-01-01

    This Task Technical Plan summarizes work required to project the benzene emissions from the Late Wash Facility (LWF) as well as update the benzene, mercury, and NO x emissions from the remainder of the Defense Waste Processing Facility (DWPF). These calculations will reflect (1) the addition of the LWF and (2) the replacement of formic acid with nitric acid in the melter preparation process. The completed calculations will be used to assist DWPF in applying for the LWF Air Quality Permit

  2. Technical planning activity: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  3. Technical planning activity: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements

  4. Job and task analysis for technical staff

    International Nuclear Information System (INIS)

    Toline, B.C.

    1991-01-01

    In September of 1989 Cooper Nuclear Station began a project to upgrade the Technical Staff Training Program. This project's roots began by performing job and Task Analysis for Technical Staff. While the industry has long been committed to Job and Task Analysis to target performance based instruction for single job positions, this approach was unique in that it was not originally considered appropriate for a group as diverse as Tech Staff. Much to his satisfaction the Job and Task Analysis Project was much less complicated for Technical Staff than the author had imagined. The benefits of performing the Job and Task Analysis for Technical Staff have become increasingly obvious as he pursues lesson plan development and course revisions. The outline for this presentation will be as follows: philosophy adopted; preparation of the job survey document; performing the job analysis; performing task analysis for technical staff and associated pitfalls; clustering objectives for training and comparison to existing program; benefits now and in the future; final phase (comparison to INPO guides and meeting the needs of non-degreed engineering professionals); and conclusion. By focusing on performance based needs for engineers rather than traditional academics for training the author is confident the future Technical Staff Program will meet the challenges ahead and will exceed requirements for accreditation

  5. Task Action Plans for generic activities: Category A

    International Nuclear Information System (INIS)

    1978-10-01

    The document contains listings of generic technical activities as identified and placed in priority categories by the Office of Nuclear Reactor Regulation (NRR). In addition, it contains definitions of Priority Categories A, B, C, and D and copies of forty approved Task Action Plans for Category A activites. Problem Descriptions for the Category B, C and D tasks are contained in NUREG--0471. This material was developed within the context of NRR's Program for the Resolution of Generic Issues Related to Nuclear Power Plants. As part of this program, the assignment of identified issues to priority categories and the approval of Task Action Plans were made by NRR's Technical Activities Steering Committee, chaired by the Deputy Director, NRR. The original document was published in November 1977. In December 1977 it was updated to add the Task Action Plan for Task No. A-17, Systems Interactions in Nuclear Power Plants. This update adds Task Action Plans for Tasks A-13, A-18, A-21, A-22, A-32, A-37, A-38 and A-40. Task A-41 has been included in Task A-40. In addition, as part of this update, the following changes were made to each Task Action Plan (with the exception of the Task Action Plan for Task A-9): (1) a title page was added that includes information such as Lead NRR Organization, Lead Supervisor, Task Manager, Applicability, and Projected Completion Date; (2) detailed schedule information was deleted; and (3) a new Section 3 entitled Basis for Continued Plant Operation and Licensing Pending Completion of Task was added. These changes represent general reformatting and the addition or deletion of certain general types of information. Some substantive revisions were made to several of the plans, however, a general revision of all of the plans was not undertaken at this time

  6. Technical task plan for Acquire Commercial Technology for Retrieval

    International Nuclear Information System (INIS)

    McDaniel, L.B.

    1995-01-01

    Objective is to determine from industry their best approaches to retrieving waste from the Single Shell Tanks. This task plan describes the first 18 months of work; the task will be further defined as the work progresses. The retrieval is to be demonstrated on tank 241-C-106

  7. Salt Repository Project. FY-84 technical project plan

    International Nuclear Information System (INIS)

    1984-08-01

    The FY 84 technical plans for the Salt Repository Project (SRP) are briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management (CRWM) program are discused and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 Work Breakdown Structure Tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities, Exploratory Shaft, Land Acquisition, and Program Management) in an appendix. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. Milestones and their definitions for the plan year, as well as milestones for the outyears are also presented at this same subtask level for each subtask

  8. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  9. Report of the Office of Nuclear Reactor Regulation technical assistance task force

    International Nuclear Information System (INIS)

    1981-11-01

    In 1981, the Director of the Office of Nuclear Reactor Regulation (NRR) of the Nuclear Regulatory Commission (NRC) chartered a task force to assess the office program of technical assistance and to recommend improvements. The task force divided the technical assistance program into four areas, and the practices in each area were assessed through a series of surveys of staff, management, and contractor personnel. The task force placed emphasis in its interview and assessment process on the problem areas that exist in the technical assistance program. The report thus reflects a weight on the faults found as a result of the inquiries made. The four major areas of technical assistance contracting studied were program planning, program management and execution, program control and management information systems, and program administration and coordination

  10. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  11. Succession planning for technical experts

    International Nuclear Information System (INIS)

    Kirk, Bernadette Lugue; Cain, Ronald A.; Dewji, Shaheen A.; Agreda, Carla L.

    2017-01-01

    This report describes a methodology for identifying, evaluating, and mitigating the loss of key technical skills at nuclear operations facilities. The methodology can be adapted for application within regulatory authorities and research and development organizations, and can be directly applied by international engagement partners of the Department of Energy’s National Nuclear Security Administration (NNSA). The resultant product will be of direct benefit to two types of NNSA missions: (1) domestic human capital development programs tasked to provide focused technical expertise to succeed an aging nuclear operations workforce, and (2) international safeguards programs charged with maintaining operational safeguards for developing/existing nuclear power program in nations where minimal available resources must be used effectively. This report considers succession planning and the critical skills necessary to meet an institution’s goals and mission. Closely tied to succession planning are knowledge management and mentorship. In considering succession planning, critical skill sets are identified and are greatly dependent on the subject matter expert in question. This report also provides examples of critical skills that are job specific.

  12. Succession planning for technical experts

    Energy Technology Data Exchange (ETDEWEB)

    Kirk, Bernadette Lugue [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Cain, Ronald A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Dewji, Shaheen A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Agreda, Carla L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-07-01

    This report describes a methodology for identifying, evaluating, and mitigating the loss of key technical skills at nuclear operations facilities. The methodology can be adapted for application within regulatory authorities and research and development organizations, and can be directly applied by international engagement partners of the Department of Energy’s National Nuclear Security Administration (NNSA). The resultant product will be of direct benefit to two types of NNSA missions: (1) domestic human capital development programs tasked to provide focused technical expertise to succeed an aging nuclear operations workforce, and (2) international safeguards programs charged with maintaining operational safeguards for developing/existing nuclear power program in nations where minimal available resources must be used effectively. This report considers succession planning and the critical skills necessary to meet an institution’s goals and mission. Closely tied to succession planning are knowledge management and mentorship. In considering succession planning, critical skill sets are identified and are greatly dependent on the subject matter expert in question. This report also provides examples of critical skills that are job specific.

  13. Task plan for the US Department of Energy TMI-2 programs

    International Nuclear Information System (INIS)

    1982-10-01

    The Task Plan for the US Department of Energy (DOE) Three Mile Island (TMI) Unit 2 Programs identifies the tasks to be planned and administered by the DOE Technical Integration Office (TIO) in a manner which will maximize the use of available resources, obtain the maximum benefit from the opportunities associated with the TMI-2 cleanup effort, and retrieve generically useful information for addressing some of the key problems and issues facing the nuclear power industry. The Plan identifies tasks in three major program areas where DOE has assumed implementation responsibility. The DOE TMI-2 Programs are: Data Acquisition Program, Waste Immobilization Program, and Reactor Evaluation Program. The plan is intended to serve as a management overview by defining the task objective, benefits, and work scope with respect to prioritization of tasks and utilization of resources

  14. Technical progress in planning organization of the Ostravo-Karwina coal basin, ''Mining Projects of Ostravo''

    Energy Technology Data Exchange (ETDEWEB)

    Karpeta, B; Kolar, J

    1979-01-01

    Based on the main task of further improvement in labor productivity and improvement in the quality of products, the leading planning organization of the Ostravo-Karwina basin is planning and realizing progressive technological plans based on new equipment. Long-term plans for basin development up to 1990 stipulate a rise in capital investments by 180%, increase in the volume of productivity by 164% with a rise in the number of workers by 142%. Corresponding technical progress in planning is based on an improvement in the system of scientific-technical information, automation and technical equipping of the planning process, improvements in the forms and organizational structure. Organization of specialized research-planning groups to substantiate and to technically-economically evaluate technical progress, and also to develop comprehensive technical assignments is stipulated.

  15. Planning of Maintenance and Repair of Complicated Technical Systems

    Directory of Open Access Journals (Sweden)

    N. I. Liseychikov

    2004-01-01

    Full Text Available It is expedient to use mathematical models for substantiation of operational material consumption at maintenance of complicated technical systems. The appropriate tasks have been considered: minimization of operational material consumption; determination of maximum scope of work to be executed while maintaining one system; optimization of operational material consumption while organizing maintenance of a system group; planning of technical maintenance and determination of a number of systems to be maintained. Formalization and solution of the above problems have been accomplished.

  16. Office of Crystalline Repository Development FY 83 technical project plan

    International Nuclear Information System (INIS)

    1983-03-01

    The technical plan for FY 83 activities of the Office of Crystalline Repository Development is presented in detail. Crystalline Rock Project objectives are discussed in relation to the National Waste Terminal storage (NWTS) program. The plan is in full compliance with requirements mandated by the Nuclear Waste Policy Act of 1982. Implementation will comply with the requirements and criteria set forth in the Nuclear Regulatory Commission regulations (10 CFR 60) and the Environmental Protection Agency standard (40 CFR 191). Technical approaches and the related milestones and schedules are presented for each of the Level 3 NWTS work Breakdown Structure Tasks. These are: Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities and Excavations, Land Acquisition, and Program Management

  17. Engineering Technical Review Planning Briefing

    Science.gov (United States)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  18. Technical Assistance Plan (TAP)

    Science.gov (United States)

    A Technical Assistance Plan (TAP) enables community groups to retain the services of an independent technical advisor and to provide resources for a community group to help inform other community members about site decisions.

  19. FY 1993 task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1991-10-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to individuals and populations. The primary objective of work to be performed in FY 1993 is to complete the source term estimates and dose estimates for key radionuclides for the air and river pathways. At the end of FY 1993, the capability will be in place to estimate doses for individuals in the extended (32-county) study area, 1944--1991. Native American research will continue to provide input for tribal dose estimates. In FY 1993, the Technical Steering Panel (TSP) will decide whether demographic and river pathways data collection should be extended beyond FY 1993 levels. The FY 1993 work scopes and milestones in this document are based on the work plan discussed at the TSP Budget/Fiscal Subcommittee meeting on August 19--20, 1991. Table 1 shows the FY 1993 milestones; Table 2 shows estimated costs. The subsequent work scope descriptions are based on the milestones. This document and the FY 1992 task plans will form the basis for a contract with Battelle and the Centers for Disease Control (CDC). The 2-year dose reconstruction contract is expected to begin in February 1992. This contract will replace the current arrangement, whereby the US Department of Energy directly funds the Pacific Northwest Laboratory to conduct dose reconstruction work. In late FY 1992, the FY 1993 task plans will be more fully developed with detailed technical approaches, data quality objectives, and budgeted labor hours. The task plans will be updated again in July 1993 to reflect any scope, milestone, or cost changes directed during the year by the TSP. 2 tabs

  20. Environmental restoration and remediation technical data management plan

    International Nuclear Information System (INIS)

    Key, K.T.; Fox, R.D.

    1994-02-01

    The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit

  1. INDOT Technical Training Plan

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...

  2. Task planning systems with natural language interface

    International Nuclear Information System (INIS)

    Kambayashi, Shaw; Uenaka, Junji

    1989-12-01

    In this report, a natural language analyzer and two different task planning systems are described. In 1988, we have introduced a Japanese language analyzer named CS-PARSER for the input interface of the task planning system in the Human Acts Simulation Program (HASP). For the purpose of a high speed analysis, we have modified a dictionary system of the CS-PARSER by using C language description. It is found that the new dictionary system is very useful for a high speed analysis and an efficient maintenance of the dictionary. For the study of the task planning problem, we have modified a story generating system named Micro TALE-SPIN to generate a story written in Japanese sentences. We have also constructed a planning system with natural language interface by using the CS-PARSER. Task planning processes and related knowledge bases of these systems are explained. A concept design for a new task planning system will be also discussed from evaluations of above mentioned systems. (author)

  3. Planning oral narrative tasks: optimizing strategic planning condition through strategy instruction

    Directory of Open Access Journals (Sweden)

    André Luís Specht

    2017-06-01

    Full Text Available This article presents the results of a master thesis, which aimed at investigating the impact of strategic planning instruction on the speech performance of 6 L2 Brazilian learners. The participants, Letras-Inglês students, performed three now-and-there picture-cued narrative tasks under three different conditions: (1 no planning, (2 planning before instruction, and (3 planning after instruction. In addition, the participants filled in post-task questionnaires after the performance of each task, aiming at understanding their opinion on the conditions and tasks. Quantitative and qualitative analyses were conducted in order to examine participants’ oral production and perception, respectively. In general, there was no statistical evidence supporting the impact of instruction on participants’ oral planned performance; however, some statistical results approached significance, which may suggest some positive effects. Qualitative analyses provided positive evidence of the impact of strategic planning instruction on participant perception and their use of strategies during planning time. Moreover, the results of this study can contribute to the fields of Second Language Acquisition and Language Pegadogy.

  4. UMTRA technical assistance contractor quality assurance program plan

    International Nuclear Information System (INIS)

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements

  5. An Architecture for Robot Assemblt Task Planning

    DEFF Research Database (Denmark)

    Sun, Hongyan

    1999-01-01

    This paper discusses an integrated robot assembly task planning system architecture. In such an integrated system, the robot motion commands produced from the planning system can be validated before done-loading for actual execution.......This paper discusses an integrated robot assembly task planning system architecture. In such an integrated system, the robot motion commands produced from the planning system can be validated before done-loading for actual execution....

  6. FY 1991 Task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    1991-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The objectives of work in Fiscal Year (FY) 1991 are to analyze data and models used in Phase 1 and restructure the models to increase accuracy and reduce uncertainty in dose estimation capability. Databases will be expanded and efforts will begin to determine the appropriate scope (space, time, radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Project scope and accuracy requirements, once defined, can be translated into additional model and data requirements later in the project. Task plans for FY 1991 have been prepared based on activities approved by the Technical Steering Panel (TSP) in October 1990 and mid-year revisions discussed at the TSP planning/budget workshop in February 1991. The activities can be divided into two broad categories: (1) model and data development and evaluation, (2) project, technical and communication support. 3 figs., 1 tab

  7. FY 1992 task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    1991-10-01

    Phase 1 of the HEDR Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations from limited radionuclides, in a limited geographical area and time period. Phase 1 ended in FY 1990. In February 1991, the TSP decided to shift the project planning approach away from phases--which were centered around completion of major portions of technical activities--to individual fiscal years (FYs), which span October of one year through September of the next. Therefore, activities that were previously designated to occur in phases are now designated in an integrated schedule to occur in one or more of the next fiscal years into FY 1995. Task plans are updated every 6 months. In FY 1992, scientists will continue to improve Phase 1 data and models to calculate more accurate and precise dose estimates. The plan for FY 1992 has been prepared based on activities and budgets approved by the Technical Steering Panel (TSP) at its meeting on August 19--20, 1991. The activities can be divided into four categories: (1) model and data evaluation activities, (2) additional dose estimates, (3) model and data development activities, and (4) technical and communication support. 3 figs., 2 tabs

  8. INDOT Technical Training Plan : Appendix H

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  9. INDOT Technical Training Plan : Appendix L

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  10. INDOT Technical Training Plan : Appendix D

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  11. INDOT Technical Training Plan : Appendix A

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  12. INDOT Technical Training Plan : Appendix G

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  13. INDOT Technical Training Plan : Appendix P

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  14. INDOT Technical Training Plan : Appendix I

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  15. INDOT Technical Training Plan : Appendix M

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  16. INDOT Technical Training Plan : Appendix F

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  17. INDOT Technical Training Plan : Appendix E

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  18. INDOT Technical Training Plan : Appendix O

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  19. INDOT Technical Training Plan : Appendix J

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  20. INDOT Technical Training Plan : Appendix K

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  1. INDOT Technical Training Plan : Appendix B

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  2. INDOT Technical Training Plan : Appendix N

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  3. INDOT Technical Training Plan : Appendix C

    Science.gov (United States)

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  4. Interiors Construction Manual integrated planning, finishing and fitting out, technical servcies

    CERN Document Server

    Hausladen, Gerhard

    2010-01-01

    Soccer stadiums, airports, theaters, museums it falls to very few architects to tackle spectacular building tasks like these. The everyday work of most architects is more often focused on ""manageable"" projects like the renovation, remodeling, or rebuilding of single- and multi-family houses, schools, and offices. Whatever the nature of the building task, interior construction is always a significant design and qualitative challenge that calls for highly detailed technical expertise. After all, it affects the realm that will be brought to life and utilized by the user when the task is finished, and whose aesthetic and functional serviceability will be put to the test each and every day. The Interior Construction Manual supports planners in their daily work as a practical planning aid and reference work with the relevant standards, guidelines, reference details, and constructional solutions, all illustrated by built example projects. It brings together the crucial facts on all aspects of interior construction...

  5. Integrating Robot Task Planning into Off-Line Programming Systems

    DEFF Research Database (Denmark)

    Sun, Hongyan; Kroszynski, Uri

    1988-01-01

    a system architecture for integrated robot task planning. It identifies and describes the components considered necessary for implementation. The focus is on functionality of these elements as well as on the information flow. A pilot implementation of such an integrated system architecture for a robot......The addition of robot task planning in off-line programming systems aims at improving the capability of current state-of-the-art commercially available off-line programming systems, by integrating modeling, task planning, programming and simulation together under one platform. This article proposes...... assembly task is discussed....

  6. Reduced waste generation technical work plan

    International Nuclear Information System (INIS)

    1987-05-01

    The United States Department of Energy has established policies for avoiding plutonium losses to the waste streams and minimizing the generation of wastes produced at its nuclear facilities. This policy is evidenced in DOE Order 5820.2, which states ''Technical and administrative controls shall be directed towards reducing the gross volume of TRU waste generated and the amount of radioactivity in such waste.'' To comply with the DOE directive, the Defense Transuranic Waste Program (DTWP) supports and provides funding for specific research and development tasks at the various DOE sites to reduce the generation of waste. This document has been prepared to give an overview of current and past Reduced Waste Generation task activities which are to be based on technical and cost/benefit factors. The document is updated annually, or as needed, to reflect the status of program direction. Reduced Waste Generation (RWG) tasks encompass a wide range of goals which are basically oriented toward (1) avoiding the generation of waste, (2) changing processes or operations to reduce waste, (3) converting TRU waste into LLW by sorting or decontamination, and (4) reducing volumes through operations such as incineration or compaction

  7. Study on DSM-based task planning of product cooperative development

    Institute of Scientific and Technical Information of China (English)

    Jiang Zengqiang; Liu Mingzhou; Zhao Han; Ge Maogen; Guo Jia

    2008-01-01

    The results of analyzing the managerial characteristics and complexity of product cooperative development suggest that task planning is an important aspect for process management of product cooperative development and the method for planning tasks should be able to model the dependency between tasks and iterations during the development process. In this paper, a DSM-based method and its corresponding optimization algorithms are developed. At first the coupled task sets and uncoupled task sets are identified, and the tasks are then optimized by the corresponding algorithms. The optimal tasks plan will reduce the development time and cost. Considering the practical requirements in real world, a Multilayer DSM is proposed, and its information communication techniques between DSM and traversing principle are described in details.

  8. Mental fatigue and task control : Planning and preparation

    NARCIS (Netherlands)

    Lorist, MM; Klein, Martin; Nieuwenhuis, S; De Jong, R; Mulder, G; Meijman, TF

    The effects of mental fatigue on planning and preparation for future actions were examined, using a task switching paradigm. Fatigue was induced by "time on task," with subjects performing a switch task continuously for 2 hr. Subjects had to alternate between tasks on every second trial, so that a

  9. ACT Plan: Technical Manual. 2013/2014

    Science.gov (United States)

    ACT, Inc., 2013

    2013-01-01

    This manual contains information about the American College Test (ACT) Plan® program. The principal focus of this manual is to document the Plan program's technical adequacy in light of its intended purposes. This manual supersedes the 2011 edition. The content of this manual responds to requirements of the testing industry as established in the…

  10. Lexical Complexity of Decision-Making Writing Tasks: Form-focused Guided Strategic Planning

    Directory of Open Access Journals (Sweden)

    Fatemeh Mahdavirad

    2016-06-01

    Full Text Available The present study is an attempt to investigate the effect of form-focused guided strategic planning on lexical complexity of learners’ performance in writing tasks. The twenty intermediate level participants of the study performed an unplanned and then a planned decision-making task. In the planned task condition, the participants were provided with form-focused guided strategic planning which contained detailed instructions about how to plan, by being instructed to focus on form. The guidance included an explanation of the necessary structural and lexical patterns employed to express the learners’ views while developing a comparison-and-contrast paragraph in each task. The results of the statistical analysis indicated that the participants produced a written product with a greater lexical complexity in their performance of the task in the form-focused strategic planning condition. The findings emphasize the importance of guided strategic planning as a task condition in syllabus design for task-based language teaching and the necessity of incorporating this task feature for accomplishing lexical complexity in decision-making writing tasks.

  11. Study on DSM-based task planning of product cooperative development

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    The results of analyzing the managerial characteristics and complexity of product cooperative development suggest that task planning is an important aspect for process management of product cooperative development and the method for planning tasks should be able to model the dependency between tasks and iterations during the development process. In this paper, a DSM-based method and its corresponding optimization algorithms are developed. At first the coupled task sets and uncoupled task sets are identified...

  12. The Effect of Task Type and Pre-task Planning Condition on the Accuracy of Intermediate EFL Learners' Writing Performance

    Directory of Open Access Journals (Sweden)

    Seyeed Mohammad Alavi

    2012-05-01

    Full Text Available Task-based language teaching, which requires learners to transact tasks resembling their real life language needs, demands language learners to perform planning at different stages of their learning. Since various types of tasks can be used in task-based instruction, the present study examined the effect of task types and various participatory structures during pre-task planning on the quality of learners' writing performance, (i.e., accuracy. Towards this end, 120 intermediate EFL students were randomly assigned to 3 experimental groups and one control group. While the experimental groups were subjected to different pre-task planning conditions, (i.e., individual, pair, and group, the control group performed tasks without any planning. During the treatment, they experienced task modeling, presentation and completion. A factorial design was followed in the present study, and the collected data were analyzed through ANOVAs that revealed task type and pre-task planning condition influenced the writing accuracy of the participants in a way that resulted in greater accuracy in the decision-making task in the experimental groups, thereby ensuring the effectiveness of the treatment in mitigating the long-standing problem of EFL learners in achieving higher levels of accuracy when a specific task type is concerned.

  13. Technical assistance contractor Management Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins ampersand Beckwith Agra, Inc. (SHB Agra), and Geraghty ampersand Miller, Inc. (G ampersand M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC's groundwater technical breadth and depth, so G ampersand M was brought in to augment the team's capabilities. The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC's management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls

  14. ATF Neutron Irradiation Program Technical Plan

    Energy Technology Data Exchange (ETDEWEB)

    Geringer, J. W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Katoh, Yutai [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division

    2016-03-01

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization of irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.

  15. ALWR utility requirements - A technical basis for updated emergency planning

    International Nuclear Information System (INIS)

    Leaver, David E.W.; DeVine, John C. Jr.; Santucci, Joseph

    2004-01-01

    U.S. utilities, with substantial support from international utilities, are developing a comprehensive set of design requirements in the form of a Utility Requirements Document (URD) as part of an industry wide effort to establish a technical foundation for the next generation of light water reactors. A key aspect of the URD is a set of severe accident-related design requirements which have been developed to provide a technical basis for updated emergency planning for the ALWR. The technical basis includes design criteria for containment performance and offsite dose during severe accident conditions. An ALWR emergency planning concept is being developed which reflects this severe accident capability. The main conclusion from this work is that the likelihood and consequences of a severe accident for an ALWR are fundamentally different from that assumed in the technical basis for existing emergency planning requirements, at least in the U.S. The current technical understanding of severe accident risk is greatly improved compared to that available when the existing U.S. emergency planning requirements were established nearly 15 years ago, and the emerging ALWR designs have superior core damage prevention and severe accident mitigation capability. Thus, it is reasonable and prudent to reflect this design capability in the emergency planning requirements for the ALWR. (author)

  16. Technical Work Plan for: Fracture and Lithophysal Studies

    International Nuclear Information System (INIS)

    2006-01-01

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models

  17. Technical Work Plan for: Fracture and Lithophysal Studies

    Energy Technology Data Exchange (ETDEWEB)

    n

    2006-09-11

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models.

  18. Radiolytic gas generation in salt cake technical task plan

    International Nuclear Information System (INIS)

    Walker, D.D.; Crawford, C.L.; Bibler, N.E.

    1993-01-01

    High-level radioactive wastes are stored in large, steel tanks in the Savannah River Site Tank Farms. The liquid levels in these tanks are monitored to detect leakage of waste out of tanks or leakage of liquids into the tanks. Recent unexplained level fluctuations in high-level waste (HLW) tanks have caused High Level Waste Engineering (HLWE) to develop a program to better understand tank level behavior. Interim Waste Technology (IWT) has been requested by HLWE to obtain data which will lead to a better understanding of the radiolytic generations of gases in salt cake. The task described below will provide data from laboratory experiments with simulated wastes which can be used in tank level fluctuation modeling. The following experimental programs have been formulated to meet the task requirements of the customer: (A) determine whether radiolytically generated gas bubbles can be trapped in salt cake; (B) determine the composition of gases produced by radiolysis; (C) determine the yield of radiolysis gases as a function of radiation dose; (D) determine bubble distribution

  19. Validating the Electric Maze Task as a Measure of Planning

    Science.gov (United States)

    Sheppard, Kelly W.; Cheatham, Carol L.

    2017-01-01

    The Electric Maze Task (EMT) is a novel planning task designed to allow flexible testing of planning abilities across a broad age range and to incorporate manipulations to test underlying planning abilities, such as working-memory and inhibitory control skills. The EMT was tested in a group of 63 typically developing 7- to 12-year-olds.…

  20. Lexical Complexity of Decision-Making Writing Tasks: Form-focused Guided Strategic Planning

    OpenAIRE

    Mahdavirad, Fatemeh

    2016-01-01

    The present study is an attempt to investigate the effect of form-focused guided strategic planning on lexical complexity of learners’ performance in writing tasks. The twenty intermediate level participants of the study performed an unplanned and then a planned decision-making task. In the planned task condition, the participants were provided with form-focused guided strategic planning which contained detailed instructions about how to plan, by being instructed to focus on form. The guidanc...

  1. Tank waste remediation system retrieval authorization basis amendment task plan

    International Nuclear Information System (INIS)

    Goetz, T.G.

    1998-01-01

    This task plan is a documented agreement between Nuclear Safety and Licensing and the Process Development group within the Waste Feed Delivery organization. The purpose of this task plan is to identify the scope of work, tasks and deliverables, responsibilities, manpower, and schedules associated with an authorization basis amendment as a result of the Waste Feed Waste Delivery Program, Project W-211, and Project W-TBD

  2. The Planning Task for Teams (PLATT): An environment for research on planning and decision making in teams

    NARCIS (Netherlands)

    Kamphuis, W.; Houttuin, K.

    2007-01-01

    In this report, we introduce a newly developed task environment for experimental team research: the Planning Task for Teams (PLATT). PLATT is a scenario based, computerized, complex planning task for three-person teams. PLATT has been designed to be able to do experimental laboratory research on

  3. Engineering Task Plan for Routine Engineering Support for Core Sampler System

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    Routine engineering support is required during normal operation of the core sampler trucks and associated ancillary equipment. This engineering support consists of, but is not limited to, troubleshooting operation problems, correcting minor design problems, assistance with work package preparation, assistance with procurement, fabrication shop support, planning of engineering tasks and preparation of associated Engineering Task Plans (ETP) and Engineering Service Requests (ESR). This ETP is the management plan document for implementing routine engineering support. Any additional changes to the scope of this ETP shall require a Letter of Instruction from Lockheed Martin Hanford Corp (LMHC). This document will also be the Work Planning Document for Development Control (HNF 1999a). The scope of this task will be to provide routine engineering support for Characterization equipment as required to support Characterization Operations. A task by task decision will be made by management to determine which tasks will be done per this ETP and if additional ETPs and/or ESRs are required. Due to the unique nature of this task, the only identifiable deliverable is to provide support as requested. Deliverables will be recorded in a task logbook as activities are identified. ESRs will be generated for tasks that require more than 40 person hours to complete, per Characterization Engineering Desk Instructions (DI 1999a)

  4. The technical bases for government emergency plans

    International Nuclear Information System (INIS)

    Champion, D.; Herviou, K.

    2006-01-01

    Despite technical and organisational existing arrangements to prevent human and equipment failures, the occurrence of a severe accident inducing an important release of radioactive or toxic products could not be totally excluded. Public authorities are responsible for the development of emergency plans which main objective is the protection of the population in case of accident. The efficiency of emergency plans assumes they have been established before the occurrence of any accident, taking into account specificities of the installation and its environment. On the basis of the list of possible events likely to induce releases into the environment, some 'envelope' scenarios are selected and their consequences are assessed- The comparison of the consequences to reference levels for which protective actions are recommended gives the area where actions may be required. This approach is applied for the different nuclear facilities in France. Examples are given in the article on the definition of emergency plans technical basis for nuclear power plants, other nuclear facilities and transportation of radioactive materials. (authors)

  5. HUMAN-MACHINE INTERACTION IN SOLVING TASKS OF THE PLANNING DEPARTMENT

    Directory of Open Access Journals (Sweden)

    Boris Alekseyevich Kucherov

    2017-12-01

    Full Text Available The paper discusses issues of human-machine interaction in solving tasks of the planning department under severe resource restrictions using information technology. The negative factors influencing specialists of the planning department in solving their tasks under the given circumstances are shown. Specific features of designing the user interface in this subject area are noted. Directions to increase the efficiency of reaction of the planning department’s specialists to change the current situation by visual and sound notification of various events are marked. Various ways to develop user interface to generate a conflict-free plan under severe resource restrictions are considered. The variants of informative presentation of operational and statistical information to stakeholders are analyzed. These issues are discussed by the example of the planning department which solves the tasks of allocation of control facilities for spacecraft (a subset of satellite range scheduling problem,

  6. Tank Waste Remediation System (TWRS) Retrieval Authorization Basis Amendment Task Plan

    International Nuclear Information System (INIS)

    HARRIS, J.P.

    1999-01-01

    This task plan is a documented agreement between Nuclear Safety and Licensing and Retrieval Engineering. The purpose of this task plan is to identify the scope of work, tasks and deliverables, responsibilities, manpower, and schedules associated with an authorization basis amendment as a result of the Waste Feed Delivery Program, Project W-211, Project W-521, and Project W-522

  7. Planning and task management in Parkinson's disease: differential emphasis in dual-task performance.

    Science.gov (United States)

    Bialystok, Ellen; Craik, Fergus I M; Stefurak, Taresa

    2008-03-01

    Seventeen patients diagnosed with Parkinson's disease completed a complex computer-based task that involved planning and management while also performing an attention-demanding secondary task. The tasks were performed concurrently, but it was necessary to switch from one to the other. Performance was compared to a group of healthy age-matched control participants and a group of young participants. Parkinson's patients performed better than the age-matched controls on almost all measures and as well as the young controls in many cases. However, the Parkinson's patients achieved this by paying relatively less attention to the secondary task and focusing attention more on the primary task. Thus, Parkinson's patients can apparently improve their performance on some aspects of a multidimensional task by simplifying task demands. This benefit may occur as a consequence of their inflexible exaggerated attention to some aspects of a complex task to the relative neglect of other aspects.

  8. Learners’ processes during pre-task planning and Working Memory Capacity

    Directory of Open Access Journals (Sweden)

    Maria da Gloria Tavares

    2016-01-01

    Full Text Available http://dx.doi.org/10.5007/2175-8026.2016v69n1p79 The present study is part of a larger scale research (Guará-Tavares, 2011, 2013 that investigates the relationship among working memory capacity, pre-task planning, and L2 speech performance. The aim of the study was to analyze 1 what processes learners engage during pre-task planning, and 2 whether higher and lower working memory spans engage in different processes during pre-task planning. Learners’ processes were accessed by means of think aloud protocols and a retrospective interview. Working memory capacity was measured by the Speaking Span Test. Results show that learners engage mainly in organization of ideas, rehearsal, lexical searches, and monitoring.. Moreover, higher spans employ significantly more metacognitive strategies during planning when compared to lower spans.

  9. Real-time Planning Support: A Task-technology Fit Perspective

    NARCIS (Netherlands)

    E. Krauth (Elfriede)

    2008-01-01

    textabstractPlanning technology by itself is not sufficient to improve planning performance. What are the factors that determine the extent to which the benefits of planning technology are realized? In order to answer this question, this dissertation studies four mechanisms of fit between task and

  10. Robot Learning from Demonstration: A Task-level Planning Approach

    Directory of Open Access Journals (Sweden)

    Staffan Ekvall

    2008-09-01

    Full Text Available In this paper, we deal with the problem of learning by demonstration, task level learning and planning for robotic applications that involve object manipulation. Preprogramming robots for execution of complex domestic tasks such as setting a dinner table is of little use, since the same order of subtasks may not be conceivable in the run time due to the changed state of the world. In our approach, we aim to learn the goal of the task and use a task planner to reach the goal given different initial states of the world. For some tasks, there are underlying constraints that must be fulfille, and knowing just the final goal is not sufficient. We propose two techniques for constraint identification. In the first case, the teacher can directly instruct the system about the underlying constraints. In the second case, the constraints are identified by the robot itself based on multiple observations. The constraints are then considered in the planning phase, allowing the task to be executed without violating any of them. We evaluate our work on a real robot performing pick-and-place tasks.

  11. Task 2 Report - A GIS-Based Technical Potential Assessment of Domestic Energy Resources for Electricity Generation.

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Nathan [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Grue, Nicholas W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Rosenlieb, Evan [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-03-14

    The purpose of this report is to support the Lao Ministry of Energy and Mines in assessing the technical potential of domestic energy resources for utility scale electricity generation in the Lao PDR. Specifically, this work provides assessments of technical potential, and associated maps of developable areas, for energy technologies of interest. This report details the methodology, assumptions, and datasets employed in this analysis to provide a transparent, replicable process for future analyses. The methodology and results presented are intended to be a fundamental input to subsequent decision making and energy planning-related analyses. This work concentrates on domestic energy resources for utility-scale electricity generation and considers solar photovoltaic, wind, biomass, and coal resources. This work does not consider potentially imported energy resources (e.g., natural gas) or domestic energy resources that are not present in sufficient quantity for utility-scale generation (e.g., geothermal resources). A technical potential assessment of hydropower resources is currently not feasible due to the absence of required data including site-level assessments of multiple characteristics (e.g., geology environment and access) as well as spatial data on estimated non-exploited hydropower resources. This report is the second output of the Energy Alternatives Study for the Lao PDR, a collaboration led by the Lao Ministry of Energy and Mines and the United States Agency for International Development under the auspices of the Smart Infrastructure for the Mekong program. The Energy Alternatives Study is composed of five successive tasks that collectively support the project's goals. This work is focused on Task 2 - Assess technical potential of domestic energy resources for electricity generation. The work was carried out by a team from the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) in collaboration with the Lao Ministry of Energy

  12. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  13. Technical know-how of site descriptive modeling for site characterization - 59089

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Onoe, Hironori; Doke, Ryosuke; Niizato, Tadafumi; Yasue, Ken-ichi

    2012-01-01

    The site descriptive model covering the current status of characteristics of geological environment and the site evolution model for estimation of the long-term evolution of site conditions are used to integrate multi-disciplinary investigation results. It is important to evaluate uncertainties in the models, to specify issues regarding the uncertainties and to prioritize the resolution of specified issues, for the planning of site characterization. There is a large quantity of technical know-how in the modeling process. It is important to record the technical know-how with transparency and traceability, since site characterization projects generally need long duration. The transfer of the technical know-how accumulated in the research and development (R and D) phase to the implementation phase is equally important. The aim of this study is to support the planning of initial surface-based site characterizations based on the technical know-how accumulated from the underground research laboratory projects. These projects are broad scientific studies of the deep geological environment and provide a technical basis for the geological disposal of high-level radioactive wastes. In this study, a comprehensive task flow from acquisition of existing data to planning of field investigations through the modeling has been specified. Specific task flow and decision-making process to perform the tasks have been specified. (authors)

  14. Creating a bridge between data collection and program planning: a technical assistance model to maximize the use of HIV/AIDS surveillance and service utilization data for planning purposes.

    Science.gov (United States)

    Logan, Jennifer A; Beatty, Maile; Woliver, Renee; Rubinstein, Eric P; Averbach, Abigail R

    2005-12-01

    Over time, improvements in HIV/AIDS surveillance and service utilization data have increased their usefulness for planning programs, targeting resources, and otherwise informing HIV/AIDS policy. However, community planning groups, service providers, and health department staff often have difficulty in interpreting and applying the wide array of data now available. We describe the development of the Bridging Model, a technical assistance model for overcoming barriers to the use of data for program planning. Through the use of an iterative feedback loop in the model, HIV/AIDS data products constantly are evolving to better inform the decision-making tasks of their multiple users. Implementation of this model has led to improved data quality and data products and to a greater willingness and ability among stakeholders to use the data for planning purposes.

  15. River Protection Double-Shell Tank Waste Retrieval Authorization Basis Amendment Task Plan

    International Nuclear Information System (INIS)

    HARRIS, J.P.

    2000-01-01

    This task plan is a documented agreement between Nuclear Safety and Licensing and Retrieval Engineering. The purpose of this task plan is to identify the scope of work, tasks and deliverables, responsibilities, manpower, and schedules associated with an authorization basis amendment as a result of the Waste Feed Delivery Program, Project W-211, Project W-521, and Project W-522

  16. Engineering Task Plan for simulated riser installation by use of rotary drilling

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1995-12-01

    This task is being performed to demonstrate the feasibility of the best riser installation alternative identified in the Engineering Study. This Engineering Task Plan (ETP) will be the WHC project management plan for the riser installation demonstration activities

  17. Modeling of Task Planning for Multirobot System Using Reputation Mechanism

    Directory of Open Access Journals (Sweden)

    Zhiguo Shi

    2014-01-01

    Full Text Available Modeling of task planning for multirobot system is developed from two parts: task decomposition and task allocation. In the part of task decomposition, the conditions and processes of decomposition are elaborated. In the part of task allocation, the collaboration strategy, the framework of reputation mechanism, and three types of reputations are defined in detail, which include robot individual reputation, robot group reputation, and robot direct reputation. A time calibration function and a group calibration function are designed to improve the effectiveness of the proposed method and proved that they have the characteristics of time attenuation, historical experience related, and newly joined robot reward. Tasks attempt to be assigned to the robot with higher overall reputation, which can help to increase the success rate of the mandate implementation, thereby reducing the time of task recovery and redistribution. Player/Stage is used as the simulation platform, and three biped-robots are established as the experimental apparatus. The experimental results of task planning are compared with the other allocation methods. Simulation and experiment results illustrate the effectiveness of the proposed method for multi-robot collaboration system.

  18. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  19. The Effects of Pre-Task Planning and On-line Planning on Fluency, Complexity, and Accuracy in L2 Monologic Oral Production.

    Science.gov (United States)

    Yuan, Fangyuan; Ellis, Rod

    2003-01-01

    Investigated the effects of both pre-task and on-line planning on second language (L2) oral production. Results show that pre-task planning enhances grammatical complexity while on-line planning positively influences accuracy and grammatical complexity. Pre-task planners also produced more fluent and lexically varied language than the on-line…

  20. Technical assistance contractor Management Plan. Final [report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  1. Technical architecture of ONC-approved plans for statewide health information exchange.

    Science.gov (United States)

    Barrows, Randolph C; Ezzard, John

    2011-01-01

    ONC-approved state plans for HIE were reviewed for descriptions and depictions of statewide HIE technical architecture. Review was complicated by non-standard organizational elements and technical terminology across state plans. Findings were mapped to industry standard, referenced, and defined HIE architecture descriptions and characteristics. Results are preliminary due to the initial subset of ONC-approved plans available, the rapid pace of new ONC-plan approvals, and continuing advancements in standards and technology of HIE, etc. Review of 28 state plans shows virtually all include a direct messaging component, but for participating entities at state-specific levels of granularity (RHIO, enterprise, organization/provider). About ½ of reviewed plans describe a federated architecture, and ¼ of plans utilize a single-vendor "hybrid-federated" architecture. About 1/3 of states plan to leverage new federal and open exchange technologies (DIRECT, CONNECT, etc.). Only one plan describes a centralized architecture for statewide HIE, but others combine central and federated architectural approaches.

  2. Integrated Technical Information for the Air Logistics Center: Enhancing Maintenance Technician Task Performance

    National Research Council Canada - National Science Library

    Mitta, Deborah

    1998-01-01

    This technical paper documents the final results of an analysis of the task environment under which depot maintenance technicians perform their jobs--specifically, programmed depot maintenance (PDM) for F-15 aircraft...

  3. Technical Support Section annual work plan for FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    Adkisson, B.P.; Allison, K.L.; Effler, R.P.; Hess, R.A.; Keeble, T.A.; Odom, S.M.; Smelcer, D.R.

    1997-12-01

    The Technical Support Section (TSS) of the Instrumentation and Controls (I and C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from, and is driven directly by, current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R and D programs because of attrition or budget cuts. TSS does not have an annual budget to cover operating expenses incurred in providing instrument maintenance support to ORNL. Each year, TSS collects information concerning the projected funding levels of programs and facilities it supports. TSS workforce and resource projections are based on the information obtained and are weighted depending on the percentage of support provided to that division or program. Each year, TSS sets the standard hourly charge rate for the following fiscal year. The Long-Range Work Plan is based on estimates of the affects of the long-range priorities and directions of the Laboratory. Proposed new facilities and programs provide additional bases for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, reevaluation of qualifications for new hires, and identification of essential test equipment that will be needed for new work.

  4. Planning and Enacting Mathematical Tasks of High Cognitive Demand in the Primary Classroom

    Science.gov (United States)

    Georgius, Kelly

    2013-01-01

    This study offers an examination of two primary-grades teachers as they learn to transfer knowledge from professional development into their classrooms. I engaged in planning sessions with each teacher to help plan tasks of high cognitive demand, including anticipating and planning for classroom discourse that would occur around the task. A…

  5. Allocating time to future tasks: the effect of task segmentation on planning fallacy bias.

    Science.gov (United States)

    Forsyth, Darryl K; Burt, Christopher D B

    2008-06-01

    The scheduling component of the time management process was used as a "paradigm" to investigate the allocation of time to future tasks. In three experiments, we compared task time allocation for a single task with the summed time allocations given for each subtask that made up the single task. In all three, we found that allocated time for a single task was significantly smaller than the summed time allocated to the individual subtasks. We refer to this as the segmentation effect. In Experiment 3, we asked participants to give estimates by placing a mark on a time line, and found that giving time allocations in the form of rounded close approximations probably does not account for the segmentation effect. We discuss the results in relation to the basic processes used to allocate time to future tasks and the means by which planning fallacy bias might be reduced.

  6. Safety Standards Plan for Middlesex County Vocational & Technical High Schools.

    Science.gov (United States)

    Sommer, Cy

    This vocational education safety standards plan outlines rules and regulations adopted by the Board of Education of Middlesex County Vocational and Technical High Schools. The first of eleven chapters presents demographics and a safety organization table for Middlesex County Vocational and Technical Schools. In chapter 2, six safety program…

  7. Application of GIS Technology for Town Planning Tasks Solving

    Science.gov (United States)

    Kiyashko, G. A.

    2017-11-01

    For developing territories, one of the most actual town-planning tasks is to find out the suitable sites for building projects. The geographic information system (GIS) allows one to model complex spatial processes and can provide necessary effective tools to solve these tasks. We propose several GIS analysis models which can define suitable settlement allocations and select appropriate parcels for construction objects. We implement our models in the ArcGIS Desktop package and verify by application to the existing objects in Primorsky Region (Primorye Territory). These suitability models use several variations of the analysis method combinations and include various ways to resolve the suitability task using vector data and a raster data set. The suitability models created in this study can be combined, and one model can be integrated into another as its part. Our models can be updated by other suitability models for further detailed planning.

  8. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  9. Engineering Task Plan for Hepa Filter Differential Pressure (DP) Fan Interlock Upgrades

    International Nuclear Information System (INIS)

    SIMONS, S.R.

    2000-01-01

    This document provides a plan for installation of Differential Pressure (DP) fan interlocks on the primary ventilation systems in selected Tank Farm facilities. This plan contains the engineering tasks required for installation and is summarized by the Acceptance for Beneficial Use list. Individuals responsible for each task are identified and scheduled accordingly

  10. Operation REDWING Commander Task Group 7.3, Operation Plan Number 1-56.

    Science.gov (United States)

    1956-01-24

    Radio Circuit Description SI. Tab B - Radio Frequency Plan 7:: Tab C - Aircraft Radio Frequency List Tab D - Radio Circuit Diagram Appendix 2 - Radio...Frequency Plan C Aircraft Radio Frequency List D Radio Circuit Diagrams 2 - Radio Call Signs and Code ’Words N. ROHI5BE2 E LCDR, U. S. Navy Flag...appendix. TABS: A Radio Circuit Description B Radio Frequency Plan C Aircraft Radio Frequency List D Radio Circuit Diagrams Joint Task Force SEVEN Task

  11. Strategic and Unpressured Within-Task Planning and Their Associations with Working Memory

    Science.gov (United States)

    Li, Shaofeng; Fu, Mengxia

    2018-01-01

    This study investigated the comparative effects of strategic and unpressured within-task planning on second language (L2) Chinese oral production and the role of working memory in mediating the effects of the two types of planning. Twenty-nine L2 Chinese learners at a large New Zealand university performed a narrative task after watching a…

  12. Technical basis for PWR emergency plans forming

    International Nuclear Information System (INIS)

    L'Homme, A.; Manesse, D.; Gauvain, J.; Crabol, B.

    1989-10-01

    Our speech first summarizes the french approach concerning the management of severe accidents which could occur on PWR stations. Then it defines the source-term which is being used as a general support for elaborating the emergency plans devoted to the protection of the population. It describes next the consequences of this source-term on the site and in the environment, which constitute the technical bases for defining actions of utilities and concerned authorities. It gives lastly information on the present status of the different emergency plans and the complementary work undertaken to improve them [fr

  13. Model Watershed Plan; Lemhi, Pahsimeroi, and East Fork of the Salmon River Management Plan, 1995 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Swift, Ralph

    1995-11-01

    Idaho`s Model Watershed Project was established as part of the Northwest Power Planning Council`s plan for salmon recovery in the Columbia River Basin. The Council`s charge was simply stated and came without strings. The tasks were to identify actions within the watershed that are planned or needed for salmon habitat, and establish a procedure for implementing habitat-improvement measures. The Council gave the responsibility of developing this project to the Idaho Soil Conservation Commission. This Model Watershed Plan is intended to be a dynamic plan that helps address these two tasks. It is not intended to be the final say on either. It is also not meant to establish laws, policies, or regulations for the agencies, groups, or individuals who participated in the plan development.

  14. Technical progress by major task. Semiannual technical progress report, September 29, 1997 - March 29, 1998

    International Nuclear Information System (INIS)

    1998-01-01

    The technical progress achieved during the period 29 September 1997 through 29 March 1998 on Contract DE-AC03-91SF18852 Radioisotope Thermoelectric Generators and Ancillary Activities is described in this report. The report is organized by program task structure: spacecraft integration and liaison; engineering support; safety; qualified unicouple production; RTG fabrication, assembly, and test; ground support equipment; RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and CAGO maintenance and repair

  15. Calculus of the Resources Cumulative Task Using Different Technics and Software

    Directory of Open Access Journals (Sweden)

    Ilie Margareta

    2017-01-01

    Full Text Available The present paper main objective is to reveals how one can use two software application tools: Microsoft Project 2013 and Oracle Primavera P6 Professional for the project planning management, especially for industrial projects and for the calculus and graphical representation of resources cumulative task. The present planning consider four small processes with a total of 38 activities and seven resources. The two software are used for leveling the project’s resources and for giving the necessary information about the evolutions of cumulative tasks and how its values influences the cost of project. In conclusions comparison between the values and graphical representation presented by the two software shows differences of exemplifications, most of them from the graphical point of view.

  16. UMTRA technical assistance contractor Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    Pehrson, P.

    1993-01-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation

  17. A process for integrating public involvement into technical/social programs

    International Nuclear Information System (INIS)

    Wiltshire, S.; Williams, C.

    1994-01-01

    Good technical/social decisions--those that are technically sound and publicly acceptable--result from a planning process that considers consulting the public a basic part of the technical program, as basic as hiring a technical consultant to advise about new ideas in computer modeling. This paper describes a specific process for making public involvement an integral part of decision-making about high-level radioactive waste management, so that important technical, social, environmental, economic, and cultural information and values can be incorporated in a meaningful way in planning and carrying out a high-level waste management program or project. The process for integration must consider: (a) the decision or task for which public interaction is needed; (b) the people who should or will want to participate in the decision or task; (c) the goals or purposes of the communication or interaction--the agency's and the public's; (d) the kinds of information the public needs and that the agency needs in order to understand the relevant technical and social issues; and (e) the types of communication or involvement that best serve to meet the agency's and the public's goals

  18. Technical task plan for testing filter box sorbent-paint filter test

    International Nuclear Information System (INIS)

    Kilpatrick, L.L.

    1993-01-01

    At the Savannah River Plant, High Level Waste Engineering (HLWE) asked Interim Waste Technology (IWT) to choose and test a sorbent to add to the ITP filter box that meets the EPA requirement for land disposal of containerized liquid hazardous wastes per Paint Filter Liquids (PFL) test method 9095. This report outlines the process to be used in accomplishing this task

  19. Engineering task plan for BX/BY compressor upgrade

    International Nuclear Information System (INIS)

    Strand, R.G.

    1995-01-01

    This Engineering Task Plan outlines the remaining work to be completed for the BX/BY Instrument Air upgrade. Initial work efforts were guided by Engineering Work Plan, ''BX-BY Compressor Upgrade'' dated 1-25-93 (see Attachment A) which is provided for information. The overall engineering task is to provide a permanent replacement for the instrument air supply system for the 241-BX/BY Tank Farms. The existing system consists of a 25 horsepower Worthington non-lube compressor and an Oriad air dryer. The existing equipment is dated, requires high maintenance and is located in a contaminated zone making it unusable. The BX/BY instrument air replacement unit will be one of the 100 SCFM generic air stations. This station will be permanently sited with the addition of drawing changes to provide a concrete foundation, air piping to existing lines and electrical power supply tie-ins

  20. Supplement to a Methodology for Succession Planning for Technical Experts

    Energy Technology Data Exchange (ETDEWEB)

    Kirk, Bernadette Lugue [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Cain, Ronald A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Agreda, Carla L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-11-01

    This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a draft methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, and the methodology is tested through interviews with selected subject matter experts.

  1. River Protection Project waste feed delivery program technical performance measurement assessment plan

    International Nuclear Information System (INIS)

    O'TOOLE, S.M.

    1999-01-01

    This plan establishes a formal technical performance-monitoring program. Technical performance is assessed by establishing requirements based performance goals at the beginning of a program and routinely evaluating progress in meeting these goals at predetermined milestones throughout the project life cycle

  2. Minimum Time Path Planning for Robotic Manipulator in Drilling/ Spot Welding Tasks

    Directory of Open Access Journals (Sweden)

    Qiang Zhang

    2016-04-01

    Full Text Available In this paper, a minimum time path planning strategy is proposed for multi points manufacturing problems in drilling/spot welding tasks. By optimizing the travelling schedule of the set points and the detailed transfer path between points, the minimum time manufacturing task is realized under fully utilizing the dynamic performance of robotic manipulator. According to the start-stop movement in drilling/spot welding task, the path planning problem can be converted into a traveling salesman problem (TSP and a series of point to point minimum time transfer path planning problems. Cubic Hermite interpolation polynomial is used to parameterize the transfer path and then the path parameters are optimized to obtain minimum point to point transfer time. A new TSP with minimum time index is constructed by using point-point transfer time as the TSP parameter. The classical genetic algorithm (GA is applied to obtain the optimal travelling schedule. Several minimum time drilling tasks of a 3-DOF robotic manipulator are used as examples to demonstrate the effectiveness of the proposed approach.

  3. Thermoelectric materials evaluation program. Quarterly technical task report No. 46

    International Nuclear Information System (INIS)

    Hampl, E.F. Jr.

    1976-02-01

    This forty-sixth Technical Task Report prepared under contract E(11-1)-2331 with the U.S. AEC and U.S. ERDA covers the performance period from October 1, 1975, to December 31, 1975. Highlights include the following tasks: N-type material development (material synthesis--gadolinium selenide compositions; material analyses; material processing; element contacting; ingradient compatibility and life testing; mechanical property characterization), TPM-217 P-type characterization (material preparation and analyses; element contacting; thermodynamic stability; isothermal chemical compatibility; ingradient compatibility and ingradient life testing; performance mapping of contacted and noncontacted elements; high-temperature partitioned P-legs), couple development (design and development of TPM-217/gadolinium selenide rare earth chalcogenide couple; design and development of TPM-217/3N-PbTe couples; advanced generator concepts), module development, liaison with Jet Propulsion Laboratory and material supply, liaison with GGA, and program management. 24 figures, 27 tables

  4. Cooperation of technical support organizations of state nuclear regulatory committee of Ukraine in sip safety regulation

    International Nuclear Information System (INIS)

    Bikov, V.O.; Kyilochits'ka, T.P.; Bogorins'kij, P.; Vasil'chenko, V.M.; Kondrat'jev, S.M.; Smishlyajeva, S.P.; Troter, D.

    2002-01-01

    The main task of the technical support in the Shelter Implementation Plan (SIP) licensing process consists in Technical Evaluation of SIP projects and documents submitted by the Licensee to State Nuclear Regulatory Committee to substantiate the safety of Shelter-related work. The goal of this task is to evaluate the submitted materials whether they meet the requirements of nuclear and radiation safety

  5. INDOT Technical Training Plan : [Technical Summary

    Science.gov (United States)

    2012-01-01

    A wide range of job classifications, increasing technical : performance expectations, licensing and certification requirements, : budget restrictions and frequent department : reorganization has made technical training of employees : more difficult, ...

  6. Sustainable Mining Environment: Technical Review of Post-mining Plans

    Directory of Open Access Journals (Sweden)

    Restu Juniah

    2017-12-01

    Full Text Available The mining industry exists because humans need mining commodities to meet their daily needs such as motor vehicles, mobile phones, electronic equipment and others. Mining commodities as mentioned in Government Regulation No. 23 of 2010 on Implementation of Mineral and Coal Mining Business Activities are radioactive minerals, metal minerals, nonmetallic minerals, rocks and coal. Mineral and coal mining is conducted to obtain the mining commodities through production operations. Mining and coal mining companies have an obligation to ensure that the mining environment in particular after the post production operation or post mining continues. The survey research aims to examine technically the post-mining plan in coal mining of PT Samantaka Batubara in Indragiri Hulu Regency of Riau Province towards the sustainability of the mining environment. The results indicate that the post-mining plan of PT Samantaka Batubara has met the technical aspects required in post mining planning for a sustainable mining environment. Postponement of post-mining land of PT Samantaka Batubara for garden and forest zone. The results of this study are expected to be useful and can be used by stakeholders, academics, researchers, practitioners and associations of mining, and the environment.

  7. Fundamentals of neurosurgery: virtual reality tasks for training and evaluation of technical skills.

    Science.gov (United States)

    Choudhury, Nusrat; Gélinas-Phaneuf, Nicholas; Delorme, Sébastien; Del Maestro, Rolando

    2013-11-01

    Technical skills training in neurosurgery is mostly done in the operating room. New educational paradigms are encouraging the development of novel training methods for surgical skills. Simulation could answer some of these needs. This article presents the development of a conceptual training framework for use on a virtual reality neurosurgical simulator. Appropriate tasks were identified by reviewing neurosurgical oncology curricula requirements and performing cognitive task analyses of basic techniques and representative surgeries. The tasks were then elaborated into training modules by including learning objectives, instructions, levels of difficulty, and performance metrics. Surveys and interviews were iteratively conducted with subject matter experts to delimitate, review, discuss, and approve each of the development stages. Five tasks were selected as representative of basic and advanced neurosurgical skill. These tasks were: 1) ventriculostomy, 2) endoscopic nasal navigation, 3) tumor debulking, 4) hemostasis, and 5) microdissection. The complete training modules were structured into easy, intermediate, and advanced settings. Performance metrics were also integrated to provide feedback on outcome, efficiency, and errors. The subject matter experts deemed the proposed modules as pertinent and useful for neurosurgical skills training. The conceptual framework presented here, the Fundamentals of Neurosurgery, represents a first attempt to develop standardized training modules for technical skills acquisition in neurosurgical oncology. The National Research Council Canada is currently developing NeuroTouch, a virtual reality simulator for cranial microneurosurgery. The simulator presently includes the five Fundamentals of Neurosurgery modules at varying stages of completion. A first pilot study has shown that neurosurgical residents obtained higher performance scores on the simulator than medical students. Further work will validate its components and use in a

  8. Controlling networking multimedia appliances: with an open environment - a plan-based approach

    OpenAIRE

    Jantz, D.; Heider, T.

    2000-01-01

    The need for a better user assistance in technical environments led to the birth of a planning assistant. The principal problems in representing real world tasks in this environment of multimedia home devices are explained. A special issue is the developed EMBASSI Generic Architecture to integrate networked multimedia appliances. The planning assistant engages planning algorithms to fullfill user desires without handling traditional technical control interfaces.

  9. Proposal of Constraints Analysis Method Based on Network Model for Task Planning

    Science.gov (United States)

    Tomiyama, Tomoe; Sato, Tatsuhiro; Morita, Toyohisa; Sasaki, Toshiro

    Deregulation has been accelerating several activities toward reengineering business processes, such as railway through service and modal shift in logistics. Making those activities successful, business entities have to regulate new business rules or know-how (we call them ‘constraints’). According to the new constraints, they need to manage business resources such as instruments, materials, workers and so on. In this paper, we propose a constraint analysis method to define constraints for task planning of the new business processes. To visualize each constraint's influence on planning, we propose a network model which represents allocation relations between tasks and resources. The network can also represent task ordering relations and resource grouping relations. The proposed method formalizes the way of defining constraints manually as repeatedly checking the network structure and finding conflicts between constraints. Being applied to crew scheduling problems shows that the method can adequately represent and define constraints of some task planning problems with the following fundamental features, (1) specifying work pattern to some resources, (2) restricting the number of resources for some works, (3) requiring multiple resources for some works, (4) prior allocation of some resources to some works and (5) considering the workload balance between resources.

  10. Software configuration management plan for the Hanford site technical database

    International Nuclear Information System (INIS)

    GRAVES, N.J.

    1999-01-01

    The Hanford Site Technical Database (HSTD) is used as the repository/source for the technical requirements baseline and programmatic data input via the Hanford Site and major Hanford Project Systems Engineering (SE) activities. The Hanford Site SE effort has created an integrated technical baseline for the Hanford Site that supports SE processes at the Site and project levels which is captured in the HSTD. The HSTD has been implemented in Ascent Logic Corporation (ALC) Commercial Off-The-Shelf (COTS) package referred to as the Requirements Driven Design (RDD) software. This Software Configuration Management Plan (SCMP) provides a process and means to control and manage software upgrades to the HSTD system

  11. DECOVALEX II PROJECT. Technical report - Task 1A and 1B

    International Nuclear Information System (INIS)

    Lanru Jing; Stephansson, Ove; Kautsky, F.

    1998-08-01

    DECOVALEX II project started in November 1995 as a continuation of the DECOVALEX I project, which was completed at the end of 1994. The project was initiated by recognizing the fact that a proper evaluation of the current capacities of numerical modelling of the coupled T-H-M processes in fractured media is needed not only for small scale, well controlled laboratory test cases such as those studied in DECOVALEX I, but also for less characterised, more complex and realistic in-situ experiments. This will contribute to validation and confidence building in the current mathematical models, numerical methods and computer codes. Four tasks were defined in the DECOVALEX II project: TASK 1 - numerical study of the RCF3 pumping test and shaft excavation at Sellafield by Nirex, UK; TASK 2 - numerical study of the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan; TASK 3 - review of current state-of-the-art of rock joint research and TASK 4 - report on the coupled T-H-M issues related to repository design and performance assessment. This report is one of the technical reports of the DECOVALEX II project, describing the work performed for TASK 1A and 1B - the predictions and model calibrations for the RCF 3 pumping test at Sellafield. Presented in this report are the descriptions of the project, tasks, approaches, methods and results of numerical modelling work carried out by the research teams. The report is a summary of the research reports written by the research teams and submitted to the project secretariat, and the discussions held during project workshops and task force group meetings. The opinions and conclusions in this report, however, reflect only ideas of the authors, not necessarily a collective representation of the funding organisations of the project

  12. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    Science.gov (United States)

    Hall, Timothy A.

    2011-01-01

    In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow

  13. Task-Based EFL Language Teaching with Procedural Information Design in a Technical Writing Context

    Science.gov (United States)

    Roy, Debopriyo

    2017-01-01

    Task-based language learning (TBLL) has heavily influenced syllabus design, classroom teaching, and learner assessment in a foreign or second language teaching context. In this English as foreign language (EFL) learning environment, the paper discussed an innovative language learning pedagogy based on design education and technical writing. In…

  14. Engineering Task Plan for Water Supply for Spray Washers on the Support Trucks

    International Nuclear Information System (INIS)

    BOGER, R.M.

    2000-01-01

    This Engineering Task Plan (ETP) defines the task and deliverables associated with the design, fabrication and testing of an improved spray wash system for the Rotary Mode Core Sampling (RMCS) System Support Trucks

  15. Engineering task plan HTI [Hanford Tank Initiative] cone penetrometer

    International Nuclear Information System (INIS)

    Krieg, S.A.

    1998-01-01

    The Hanford Cone Penetrometer Platform (CPP) will be used to insert instrumented and soil sampling probes into the soil adjacent to Tank AX-104 to assist in characterizing the waste plume. The scope, deliverables, roles and responsibilities, safety, and environmental considerations are presented in the task plan

  16. PWR FLECHT SEASET 21-rod bundle flow blockage task. Task plan report. FLECHT SEASET Program report No. 5

    International Nuclear Information System (INIS)

    Hochreiter, L.E.; Basel, R.A.; Dennis, R.J.; Lee, N.; Massie, H.W. Jr.; Loftus, M.J.; Rosal, E.R.; Valkovic, M.M.

    1980-10-01

    This report presents a descriptive plan of tests for the 21-Rod Bundle Flow Blockage Task of the Full-Length Emergency Cooling Heat Transfer Separate Effects and Systems Effects Test Program (FLECHT SEASET). This task will consist of forced and gravity reflooding tests utilizing electrical heater rods to simulate PWR nuclear core fuel rod arrays. All tests will be performed with a cosine axial power profile. These tests are planned to be used to determine effects of various flow blockage configurations (shapes and distributions) on reflooding behavior, to aid in development/assessment of computational models in predicting reflooding behavior of flow blockage configurations, and to screen flow blockage configurations for future 161-rod flow blockage bundle tests

  17. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  18. Engineering task plan for the development, fabrication and installation of rotary mode core sample truck bellows

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    The Rotary Mode Core Sampling Trucks (RMSCTs) currently use a multi-sectioned bellows between the grapple box and the quill rod to compensate for drill head motion and to provide a path for purge gas. The current bellows, which is detailed on drawing H-2-690059, is expensive to procure, has a lengthy procurement cycle, and is prone to failure. Therefore, a task has been identified to design, fabricate, and install a replacement bellows. This Engineering Task Plan (ETP) is the management plan document for accomplishing the identified tasks. Any changes in scope of the ETP shall require formal direction by the Characterization Engineering manager. This document shall also be considered the work planning document for developmental control per Development Control Requirements (HNF 1999a). This Engineering Task Plan (ETP) is the management plan document for accomplishing the design, fabrication, and installation of a replacement bellows assembly for the Rotary Mode Core Sampling Trucks 3 and 4 (RMCST)

  19. "Surgery interrupted": The effect of multitasking on cognitive and technical tasks in medical students.

    Science.gov (United States)

    Evans, C H; Schneider, E; Shostrom, V; Schenarts, P J

    2017-02-01

    Today's medical learners are Millennials, and reportedly, multitasking pros. We aim to evaluate effect of multitasking on cognitive and technical skills. 16 medical students completed a mock page and laceration closure separately on day 1 and day 13, and in parallel on day 14. Suturing was graded using GRS and mock pages scored. Total time, suturing and loading times, and percent correct on mock page were compared. Percent correct on mock page improved from days 1-13 and 14 (p multitasking results in longer times to complete the complex component of the technical task. Copyright © 2016 Elsevier Inc. All rights reserved.

  20. Technical aspects of positron emission tomography/computed tomography in radiotherapy treatment planning.

    Science.gov (United States)

    Scripes, Paola G; Yaparpalvi, Ravindra

    2012-09-01

    The usage of functional data in radiation therapy (RT) treatment planning (RTP) process is currently the focus of significant technical, scientific, and clinical development. Positron emission tomography (PET) using ((18)F) fluorodeoxyglucose is being increasingly used in RT planning in recent years. Fluorodeoxyglucose is the most commonly used radiotracer for diagnosis, staging, recurrent disease detection, and monitoring of tumor response to therapy (Lung Cancer 2012;76:344-349; Lung Cancer 2009;64:301-307; J Nucl Med 2008;49:532-540; J Nucl Med 2007;48:58S-67S). All the efforts to improve both PET and computed tomography (CT) image quality and, consequently, lesion detectability have a common objective to increase the accuracy in functional imaging and thus of coregistration into RT planning systems. In radiotherapy, improvement in target localization permits reduction of tumor margins, consequently reducing volume of normal tissue irradiated. Furthermore, smaller treated target volumes create the possibility of dose escalation, leading to increased chances of tumor cure and control. This article focuses on the technical aspects of PET/CT image acquisition, fusion, usage, and impact on the physics of RTP. The authors review the basic elements of RTP, modern radiation delivery, and the technical parameters of coregistration of PET/CT into RT computerized planning systems. Copyright © 2012 Elsevier Inc. All rights reserved.

  1. Second-order motor planning in children: insights from a cup-manipulation-task.

    Science.gov (United States)

    Wunsch, Kathrin; Weiss, Daniel J; Schack, Thomas; Weigelt, Matthias

    2015-07-01

    The present study examined the development of anticipatory motor planning in an object manipulation task that has been used to successfully demonstrate motor planning in non-human primates (Weiss et al. in Psychol Sci 18:1063-1068, 2007). Seventy-five participants from four different age groups participated in a cup-manipulation task. One group was preschool children (average age of 5.1 years), two groups were primary school children (7.7 and 9.8 years old respectively) and the final group was comprised of adults. The experimental task entailed reaching for a plastic cup that was vertically suspended in an apparatus in either upright or inverted orientation, removing the cup by its stem and then retrieving a small toy from the inside of the cup. When the cup was inverted in the apparatus, evidence for anticipatory motor planning could be achieved by initially gripping the stem using an inverted (thumb-down) grip posture. We found that when the cup was in upright orientation, all participants reached for the cup using an upright grip (i.e., thumb-up posture). However, when the cup was inverted in the apparatus, only adults consistently used an inverted grasping posture, though the percentage of inverted grips among participants did increase with age. These results suggest a protracted development for anticipatory motor planning abilities in children. Surprisingly, the performance of adults on this task more closely resembles the performance of several nonhuman primate species as opposed to children even at approximately 10 years of age. We discuss how morphological constraints on flexibility may help account for these findings.

  2. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  3. Task path planning, scheduling and learning for free-ranging robot systems

    Science.gov (United States)

    Wakefield, G. Steve

    1987-01-01

    The development of robotics applications for space operations is often restricted by the limited movement available to guided robots. Free ranging robots can offer greater flexibility than physically guided robots in these applications. Presented here is an object oriented approach to path planning and task scheduling for free-ranging robots that allows the dynamic determination of paths based on the current environment. The system also provides task learning for repetitive jobs. This approach provides a basis for the design of free-ranging robot systems which are adaptable to various environments and tasks.

  4. Practical Problems in Connection with the Planning and Introduction of Information Systems. Technical Report.

    Science.gov (United States)

    Klose, Traugott

    Major reforms brought about in July 1969 at the Free University of Berlin in its organization, planning, and decision making are reviewed. Specific problems are addressed, such as plans for introducing an information system on technical data and space use, plans for an information system on personnel employed by the university, and plans for an…

  5. US Nuclear Regulatory Commission human-factors program plan

    International Nuclear Information System (INIS)

    1983-08-01

    The purpose of the NRC Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design, operation, and maintenance of nuclear facilities. This initial plan addresses nuclear power plants (NPP) and describes (1) the technical assistance and research activities planned to provide the technical bases for the resolution of the remaining human factors related tasks described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements, and (2) the additional human factors efforts identified during implementation of the Action Plan that should receive NRC attention. The plan represents a systematic and comprehensive approach for addressing human factors concerns important to NPP safety in the FY-83 through FY-85 time frame

  6. An investigation of dematerialization planning options at tourism destinations: Technical and behavioural dimensions

    OpenAIRE

    Kelly, Joseph

    2006-01-01

    The goal of this dissertation is to develop a conceptual framework and associated methods for evaluating alternative tourism planning strategies in terms of dematerialization and acceptability amongst tourists. Its objectives are to (1) examine the technical potential of dematerialization planning options in tourism destinations, (2) investigate tourist perspectives concerning destination planning alternatives that promote dematerialization, (3) assess the travel market responses and demateri...

  7. Joint C4ISR Architecture Planning/Analysis System (JCAPS)

    National Research Council Canada - National Science Library

    Wostbrock, Bill

    2002-01-01

    The contractor satisfactorily completed all tasks under both efforts, providing the technology and technical expertise in the development of the Joint C4ISR Architecture Planning/Analysis System (JCAPS) Database Tool...

  8. Technical requirements document for the waste flow analysis

    International Nuclear Information System (INIS)

    Shropshire, D.E.

    1996-05-01

    Purpose of this Technical Requirements Document is to define the top level customer requirements for the Waste Flow Analysis task. These requirements, once agreed upon with DOE, will be used to flow down subsequent development requirements to the model specifications. This document is intended to be a ''living document'' which will be modified over the course of the execution of this work element. Initial concurrence with the technical functional requirements from Environmental Management (EM)-50 is needed before the work plan can be developed

  9. 75 FR 27341 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Science.gov (United States)

    2010-05-14

    ..., ramp rates, and network topology), flexible dispatch, settlement calculations, transmission switching... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference To Discuss Increasing Market and Planning Efficiency Through Improved Software May 7, 2010. Take notice that Commission...

  10. Non-technical constraints to eradication: the Italian experience.

    Science.gov (United States)

    Moda, Giuliana

    2006-02-25

    Although technical constraints to eradication of bovine tuberculosis are well-recognised, non-technical constraints can also delay progress towards eradication, leading to inefficiency and increased programme costs. This paper seeks to analyse the main non-technical constraints that can interfere with the successful implementation of tuberculosis eradication plans, based on experiences from an area of high tuberculosis prevalence in Regione Piemonte, Italy. The main social and economic constraints faced in the past 20 years are reviewed, including a social reluctance to recognise the importance of seeking eradication as the goal of disease control, effective communication of technical issues, the training and the organization of veterinary services, the relationship between the regional authority and farmers and their representatives, and data management and epidemiological reporting. The paper analyses and discusses the solutions that were applied in Regione Piemonte and the benefits that were obtained. Tuberculosis eradication plans are one of the most difficult tasks of the Veterinary Animal Health Services, and non-technical constraints must be considered when progress towards eradication is less than expected. Organizational and managerial resources can help to overcome social or economic obstacles, provided the veterinary profession is willing to address technical, but also non-technical, constraints to eradication.

  11. The Effects of Pre-Task, On-Line, and Both Pre-Task and On-Line Planning on Fluency, Complexity, and Accuracy--The Case of Iranian EFL Learners' Written Production

    Science.gov (United States)

    Piri, Faramarz; Barati, Hossein; Ketabi, Saeed

    2012-01-01

    Previous studies on the effect of planning on language production have revealed that planning does have a positive effect on language performance in terms of fluency, complexity, and accuracy. The present study was an attempt to investigate the effects of pre-task, on-line, and both pre-task and on-line planning on fluency, accuracy, and…

  12. Technical and Non-Technical Measures for air pollution emission reduction: The integrated assessment of the regional Air Quality Management Plans through the Italian national model

    Science.gov (United States)

    D'Elia, I.; Bencardino, M.; Ciancarella, L.; Contaldi, M.; Vialetto, G.

    2009-12-01

    The Italian Air Quality legislation underwent sweeping changes with the implementation of the 1996 European Air Quality Framework Directive when the Italian administrative Regions were entrusted with air quality management tasks. The most recent Regional Air Quality Management Plans (AQMPs) highlighted the importance of Non-Technical Measures (NTMs), in addition to Technical Measures (TMs), in meeting environmental targets. The aim of the present work is to compile a list of all the TMs and NTMs taken into account in the Italian Regional AQMPs and to give in the target year, 2010, an estimation of SO 2, NO x and PM 10 emission reductions, of PM 10 concentration and of the health impact of PM 2.5 concentrations in terms of Life Expectancy Reduction. In order to do that, RAINS-Italy, as part of the National Integrated Modeling system for International Negotiation on atmospheric pollution (MINNI), has been applied. The management of TMs and NTMs inside RAINS have often obliged both the introduction of exogenous driving force scenarios and the control strategy modification. This has inspired a revision of the many NTM definitions and a clear choice of the definition adopted. It was finally highlighted that only few TMs and NTMs implemented in the AQMPs represent effective measures in reaching the environmental targets.

  13. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  14. Engineering Task Plan to Expand the Environmental Operational Envelope of Core Sampling

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Task Plan authorizes the development of an Alternative Generation and Analysis (AGA). The AGA will determine how to expand the environmental operating envelope during core sampling operations

  15. Engineering Task Plan for a vapor treatment system on Tank 241-C-103

    International Nuclear Information System (INIS)

    Conrad, R.B.

    1995-01-01

    This Engineering Task Plan describes tasks and responsibilities for the design, fabrication, test, and installation of a vapor treatment system (mixing system) on Tank 241-C-103. The mixing system is to be installed downstream of the breather filter and will use a mixing blower to reduce the chemical concentrations to below allowable levels

  16. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements

  17. Task Allocation and Path Planning for Collaborative Autonomous Underwater Vehicles Operating through an Underwater Acoustic Network

    Directory of Open Access Journals (Sweden)

    Yueyue Deng

    2013-01-01

    Full Text Available Dynamic and unstructured multiple cooperative autonomous underwater vehicle (AUV missions are highly complex operations, and task allocation and path planning are made significantly more challenging under realistic underwater acoustic communication constraints. This paper presents a solution for the task allocation and path planning for multiple AUVs under marginal acoustic communication conditions: a location-aided task allocation framework (LAAF algorithm for multitarget task assignment and the grid-based multiobjective optimal programming (GMOOP mathematical model for finding an optimal vehicle command decision given a set of objectives and constraints. Both the LAAF and GMOOP algorithms are well suited in poor acoustic network condition and dynamic environment. Our research is based on an existing mobile ad hoc network underwater acoustic simulator and blind flooding routing protocol. Simulation results demonstrate that the location-aided auction strategy performs significantly better than the well-accepted auction algorithm developed by Bertsekas in terms of task-allocation time and network bandwidth consumption. We also demonstrate that the GMOOP path-planning technique provides an efficient method for executing multiobjective tasks by cooperative agents with limited communication capabilities. This is in contrast to existing multiobjective action selection methods that are limited to networks where constant, reliable communication is assumed to be available.

  18. Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

    Science.gov (United States)

    Hitz, F. R.

    1976-01-01

    The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

  19. Stress reactions to cognitively demanding tasks and open-plan office noise

    DEFF Research Database (Denmark)

    Kristiansen, Jesper; Mathiesen, Line; Nielsen, Pernille Kofoed

    2009-01-01

    measured. RESULTS: Cognitively demanding work tasks were associated with changes in HRV, systolic blood pressure and EMG that reflects increased sympathetic activity in the autonomic nervous system. No effect of noise was observed, except for a higher rating of perceived exertion in the head and, contrary......OBJECTIVES: To investigate the effects of cognitively demanding work tasks and office noise on heart rate variability (HRV), cardiovascular responses and electromyography (EMG) activity in the trapezius muscles. METHODS: Ten female volunteers were exposed to simulated open-plan office noise for 35...

  20. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2000-01-01

    The document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of S/SX and U Tank Farms

  1. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  2. Task Group on Safety Margins Action Plan (SMAP). Safety Margins Action Plan - Final Report

    International Nuclear Information System (INIS)

    Hrehor, Miroslav; Gavrilas, Mirela; Belac, Josef; Sairanen, Risto; Bruna, Giovanni; Reocreux, Michel; Touboul, Francoise; Krzykacz-Hausmann, B.; Park, Jong Seuk; Prosek, Andrej; Hortal, Javier; Sandervaag, Odbjoern; Zimmerman, Martin

    2007-01-01

    The international nuclear community has expressed concern that some changes in existing plants could challenge safety margins while fulfilling all the regulatory requirements. In 1998, NEA published a report by the Committee on Nuclear Regulatory Activities on Future Nuclear Regulatory Challenges. The report recognized 'Safety margins during more exacting operating modes' as a technical issue with potential regulatory impact. Examples of plant changes that can cause such exacting operating modes include power up-rates, life extension or increased fuel burnup. In addition, the community recognized that the cumulative effects of simultaneous changes in a plant could be larger than the accumulation of the individual effects of each change. In response to these concerns, CSNI constituted the safety margins action plan (SMAP) task group with the following objectives: 'To agree on a framework for integrated assessments of the changes to the overall safety of the plant as a result of simultaneous changes in plant operation / condition; To develop a CSNI document which can be used by member countries to assess the effect of plant change on the overall safety of the plant; To share information and experience.' The two approaches to safety analysis, deterministic and probabilistic, use different methods and have been developed mostly independently of each other. This makes it difficult to assure consistency between them. As the trend to use information on risk (where the term risk means results of the PSA/PRA analysis) to support regulatory decisions is growing in many countries, it is necessary to develop a method of evaluating safety margin sufficiency that is applicable to both approaches and, whenever possible, integrated in a consistent way. Chapter 2 elaborates on the traditional view of safety margins and the means by which they are currently treated in deterministic analyses. This chapter also discusses the technical basis for safety limits as they are used today

  3. Three-Dimensional Path Planning Software-Assisted Transjugular Intrahepatic Portosystemic Shunt: A Technical Modification

    Energy Technology Data Exchange (ETDEWEB)

    Tsauo, Jiaywei, E-mail: 80732059@qq.com; Luo, Xuefeng, E-mail: luobo-913@126.com [West China Hospital of Sichuan University, Institute of Interventional Radiology (China); Ye, Linchao, E-mail: linchao.ye@siemens.com [Siemens Ltd, Healthcare Sector (China); Li, Xiao, E-mail: simonlixiao@gmail.com [West China Hospital of Sichuan University, Institute of Interventional Radiology (China)

    2015-06-15

    PurposeThis study was designed to report our results with a modified technique of three-dimensional (3D) path planning software assisted transjugular intrahepatic portosystemic shunt (TIPS).Methods3D path planning software was recently developed to facilitate TIPS creation by using two carbon dioxide portograms acquired at least 20° apart to generate a 3D path for overlay needle guidance. However, one shortcoming is that puncturing along the overlay would be technically impossible if the angle of the liver access set and the angle of the 3D path are not the same. To solve this problem, a prototype 3D path planning software was fitted with a utility to calculate the angle of the 3D path. Using this, we modified the angle of the liver access set accordingly during the procedure in ten patients.ResultsFailure for technical reasons occurred in three patients (unsuccessful wedged hepatic venography in two cases, software technical failure in one case). The procedure was successful in the remaining seven patients, and only one needle pass was required to obtain portal vein access in each case. The course of puncture was comparable to the 3D path in all patients. No procedure-related complication occurred following the procedures.ConclusionsAdjusting the angle of the liver access set to match the angle of the 3D path determined by the software appears to be a favorable modification to the technique of 3D path planning software assisted TIPS.

  4. Characteristic-Based, Task-Based, and Results-Based: Three Value Systems for Assessing Professionally Produced Technical Communication Products.

    Science.gov (United States)

    Carliner, Saul

    2003-01-01

    Notes that technical communicators have developed different methodologies for evaluating the effectiveness of their work, such as editing, usability testing, and determining the value added. Explains that at least three broad value systems underlie the assessment practices: characteristic-based, task-based, and results-based. Concludes that the…

  5. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    International Nuclear Information System (INIS)

    RUNG, M.P.

    2000-01-01

    This document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of nine tanks in the 241-S/SX Tank Farms

  6. Solar Energy Technologies Program: Multi-Year Technical Plan 2003-2007 and Beyond

    Energy Technology Data Exchange (ETDEWEB)

    2004-01-01

    This publication charts a 5-year planning cycle for the U.S. Department of Energy Solar Energy Technologies Program. The document includes anticipated technical plans for the next 5 years for photovoltaics, concentrating solar power, solar water and space heating, solar hybrid lighting, and other new concepts that can take advantage of the solar resource. Solar energy is described as a clean, abundant, renewable energy resource that can benefit the nation by diversifying our energy supply.

  7. [Acoustic conditions in open plan office - Application of technical measures in a typical room].

    Science.gov (United States)

    Mikulski, Witold

    2018-03-09

    Noise in open plan offices should not exceed acceptable levels for the hearing protection. Its major negative effects on employees are nuisance and impediment in execution of work. Specific technical solutions should be introduced to provide proper acoustic conditions for work performance. Acoustic evaluation of a typical open plan office was presented in the article published in "Medycyna Pracy" 5/2016. None of the rooms meets all the criteria, therefore, in this article one of the rooms was chosen to apply different technical solutions to check the possibility of reaching proper acoustic conditions. Acoustic effectiveness of those solutions was verified by means of digital simulation. The model was checked by comparing the results of measurements and calculations before using simulation. The analyzis revealed that open plan offices supplemented with signals for masking speech signals can meet all the required criteria. It is relatively easy to reach proper reverberation time (i.e., sound absorption). It is more difficult to reach proper values of evaluation parameters determined from A-weighted sound pressure level (SPLA) of speech. The most difficult is to provide proper values of evaluation parameters determined from speech transmission index (STI). Finally, it is necessary (besides acoustic treatment) to use devices for speech masking. The study proved that it is technically possible to reach proper acoustic condition. Main causes of employees complaints in open plan office are inadequate acoustic work conditions. Therefore, it is necessary to apply specific technical solutions - not only sound absorbing suspended ceiling and high acoustic barriers, but also devices for speech masking. Med Pr 2018;69(2):153-165. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  8. Health and safety plan for operations performed for the Environmental Restoration Program. Task, OU 1-03 and OU 4-10 Track 2 investigations

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II [IT Corp., (United States); Reneau, M.; Morton, S.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  9. Clarification of TMI action plan requirements. Technical report

    International Nuclear Information System (INIS)

    1980-11-01

    This document, NUREG-0737, is a letter from D.G. Eisenhut, Director of the Division of Licensing, NRR, to licensees of operating power reactors and applicants for operating licenses forwarding post-TMI requirements which have been approved for implementation. Following the accident at Three Mile Island Unit 2, the NRC staff developed the Action Plan, NUREG-0660, to provide a comprehensive and integrated plan to improve safety at power reactors. Specific items from NUREG-0660 have been approved by the Commission for implementation at reactors. In this NRC report, these specific items comprise a single document which includes additional information about schedules, applicability, method of implementation review, submittal dates, and clarification of technical positions. It should be noted that the total set of TMI-related actions have been collected in NUREG-0660, but only those items that the Commission has approved for implementation to date are included in this document, NUREG-0737

  10. Neurophysiological Modulations of Non-Verbal and Verbal Dual-Tasks Interference during Word Planning.

    Directory of Open Access Journals (Sweden)

    Raphaël Fargier

    Full Text Available Running a concurrent task while speaking clearly interferes with speech planning, but whether verbal vs. non-verbal tasks interfere with the same processes is virtually unknown. We investigated the neural dynamics of dual-task interference on word production using event-related potentials (ERPs with either tones or syllables as concurrent stimuli. Participants produced words from pictures in three conditions: without distractors, while passively listening to distractors and during a distractor detection task. Production latencies increased for tasks with higher attentional demand and were longer for syllables relative to tones. ERP analyses revealed common modulations by dual-task for verbal and non-verbal stimuli around 240 ms, likely corresponding to lexical selection. Modulations starting around 350 ms prior to vocal onset were only observed when verbal stimuli were involved. These later modulations, likely reflecting interference with phonological-phonetic encoding, were observed only when overlap between tasks was maximal and the same underlying neural circuits were engaged (cross-talk.

  11. Neurophysiological Modulations of Non-Verbal and Verbal Dual-Tasks Interference during Word Planning.

    Science.gov (United States)

    Fargier, Raphaël; Laganaro, Marina

    2016-01-01

    Running a concurrent task while speaking clearly interferes with speech planning, but whether verbal vs. non-verbal tasks interfere with the same processes is virtually unknown. We investigated the neural dynamics of dual-task interference on word production using event-related potentials (ERPs) with either tones or syllables as concurrent stimuli. Participants produced words from pictures in three conditions: without distractors, while passively listening to distractors and during a distractor detection task. Production latencies increased for tasks with higher attentional demand and were longer for syllables relative to tones. ERP analyses revealed common modulations by dual-task for verbal and non-verbal stimuli around 240 ms, likely corresponding to lexical selection. Modulations starting around 350 ms prior to vocal onset were only observed when verbal stimuli were involved. These later modulations, likely reflecting interference with phonological-phonetic encoding, were observed only when overlap between tasks was maximal and the same underlying neural circuits were engaged (cross-talk).

  12. DECOVALEX II PROJECT. Technical report - Task 2A and 2B. (Revised edition)

    International Nuclear Information System (INIS)

    Lanru Jing; Stephansson, Ove

    1998-08-01

    DECOVALEX II project started in November 1995 as a continuation of the DECOVALEX I project, which was completed at the end of 1994. The project was initiated by recognizing the fact that a proper evaluation of the current capacities of numerical modelling of the coupled T-H-M processes in fractured media is needed not only for small scale, well controlled laboratory test cases such as those studied in DECOVALEX 1, but also for less characterised, more complex and realistic in-situ experiments. This will contribute to validation and confidence building in the current mathematical models, numerical methods and computer codes. Four tasks were defined in the DECOVALEX II project: TASK 1 - numerical study of the RCF3 pumping test and shaft excavation at Sellafield by Nirex, UK; TASK 2 - numerical study of the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan; TASK 3 - review of current state-of-the-art of rock joint research and TASK 4 - report on the coupled T-H-M issues related to repository design and performance assessment. This report is one of the technical reports of the DECOVALEX II project, describing the work performed for TASK 2A and 2B - the predictions and model calibration for the hydro-mechanical effect of the excavation of the test pit for the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan. Presented in this report are the descriptions of the project, definition of Task 2, and approaches, methods and results of numerical modelling work carried out by the research teams. The report is a summary of the research reports written by the research teams and the discussions held during project workshops and task force group meetings. The opinions and conclusions in this report, however, reflect only ideas of the authors, not necessarily a collective representation of the funding organisations of the project

  13. Some considerations on the development of individual work plan for teachers of Technical and Vocational Education

    Directory of Open Access Journals (Sweden)

    Carlos Alberto Gato Armas

    2010-03-01

    Full Text Available This article analyzes, from the optics of upgrading Technical and Professional Education chief staff in the province and professors in the Technical Sciences Faculty in the University of Pedagogical Sciencies “Rafael María of Mendive” in Pinar del Río, which can facilitate the elaboration of the plan for teachers’ individual work, so that it facilitates the assessment and performance of the planned activities, and at the same time, propitiating the professional development of the teachers, in each school term.

  14. Planning of activities in the Laguna Verde Central planning at 12 weeks

    International Nuclear Information System (INIS)

    Chimalpopoca, C.

    2007-01-01

    The universe of works that are carried out in a nuclear facility to maintain effective the structures, systems and components require of a continuous analysis, in the order of the maintenance frequencies that can be of the preventive, predictive or corrective type. Each component is associated to reserve parts, readiness of systems, in fulfillment to the operation technical specifications, to the environment of the one work; each component requires of a planning level, where it is distinguished with clarity when they are executed, in the operation stage, stop or recharge. This work has as end to show like the activities are planned during the operation, using planning methods to twelve weeks, where the reach of the task is conceptualized, operative requirements, of reserve parts, of the work environment analysis, of those radiological conditions, of the authorizations for their execution, the same execution and the evaluation post work like a technique to maintain in continuous improvement the tasks of the maintenance of the Units of the Power station. A motor valve to be worked in its internals requires access to the work point, it requires bill of the system, electric disconnection, maneuvers to disassemble actuators and retirement of thermal isolation if it applies, reserve parts of the caps joints, control mechanisms, personal, tools, radiological control. The success of the continuous operation of a power station is in the planning quality, the attention of each one of the details to assure that the components, structures and components stay effective to make their function when they are demanded. The planning task requires of experience and knowledge of each some of the components, the task of planning of activities and its execution is multidisciplinary This work has that purpose, to show the planning tools in the Laguna Verde Nuclear Power station, under the concept of twelve weeks. (Author)

  15. Technical Targets - A Tool to Support Strategic Planning in the Subsurface Contaminants Focus Area

    International Nuclear Information System (INIS)

    Looney, B.B.

    2002-01-01

    The Subsurface Contaminants Focus Area (SCFA) is supported by a lead laboratory consisting of technical representatives from DOE laboratories across the country. This broadly representative scientific group has developed and implemented a process to define Technical Targets to assist the SCFA in strategic planning and in managing their environmental research and development portfolio. At an initial meeting in Golden Colorado, an initial set of Technical Targets was identified using a rapid consensus based technical triage process. Thirteen Technical Targets were identified and described. Vital scientific and technical objectives were generated for each target. The targets generally fall into one of the following five strategic investment categories: Enhancing Environmental Stewardship, Eliminating Contaminant Sources, Isolating Contaminants, Controlling Contaminant Plumes, Enabling DOEs CleanUp Efforts. The resulting targets and the detail they comprise on what is, and what is not, needed to meet Environmental Management needs provide a comprehensive technically-based framework to assist in prioritizing future work and in managing the SCFA program

  16. Integrated corridor management initiative : demonstration phase evaluation - Dallas technical capability analysis test plan.

    Science.gov (United States)

    This report presents the test plan for conducting the Technical Capability Analysis for the United States : Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor : Management (ICM) Initiative Demonstration. The ...

  17. Agent independent task planning

    Science.gov (United States)

    Davis, William S.

    1990-01-01

    Agent-Independent Planning is a technique that allows the construction of activity plans without regard to the agent that will perform them. Once generated, a plan is then validated and translated into instructions for a particular agent, whether a robot, crewmember, or software-based control system. Because Space Station Freedom (SSF) is planned for orbital operations for approximately thirty years, it will almost certainly experience numerous enhancements and upgrades, including upgrades in robotic manipulators. Agent-Independent Planning provides the capability to construct plans for SSF operations, independent of specific robotic systems, by combining techniques of object oriented modeling, nonlinear planning and temporal logic. Since a plan is validated using the physical and functional models of a particular agent, new robotic systems can be developed and integrated with existing operations in a robust manner. This technique also provides the capability to generate plans for crewmembers with varying skill levels, and later apply these same plans to more sophisticated robotic manipulators made available by evolutions in technology.

  18. Apraxia of tool use: more evidence for the technical reasoning hypothesis.

    Science.gov (United States)

    Jarry, Christophe; Osiurak, François; Delafuys, David; Chauviré, Valérie; Etcharry-Bouyx, Frédérique; Le Gall, Didier

    2013-10-01

    Various distinct cognitive processes such as semantic memory, executive planning or technical reasoning have been shown to support tool use. The aim of this study is to investigate the relationship between these processes. To do so, a large apraxia battery was submitted to 16 patients with left brain-damage (LBD) and aphasia and 19 healthy controls. The battery included: classical apraxia tests (Pantomime of Tool Use and Single Tool Use), familiar and novel tool use tests (Tool-Object Pairs and Sequential Mechanical Problem-Solving), semantic memory tests (Recognition of tool utilization gestures and Functional and Categorical Associations) as well as the Tower Of London. The Sequential Mechanical Problem-Solving task is a new task which permits the evaluation of pre-planning in unusual tool use situations. In this task as well as in the Tool-Object Pairs task, participants solved a tool use problem in a Choice and a No-Choice condition to examine the effect of tool selection. Globally, left brain damaged patients were impaired as compared to controls. We found high correlations in left brain damaged patients between performances on classical apraxia tests, familiar and novel tool use tests and Functional and Categorical Associations but no significant association between these performances and Tower Of London or Recognition of tool utilization gestures. Furthermore, the two conditions (Choice and No-Choice) of Tool-Object Pairs and Sequential Mechanical Problem-Solving were associated. In sum, all tasks involving tool use are strongly associated in LBD patients. Moreover, the ability to solve sequential mechanical problems does not depend on executive planning. Also, tool use appears to be associated with knowledge about object function but not with knowledge about tool manipulation. Taken together, these findings indicate that technical reasoning and, to a lesser extent, semantic memory may both play an important role in tool use. Copyright © 2013 Elsevier Ltd

  19. Action plan for 1965, Annex 2; Prilog br. 2 - Plan zadataka u 1965. godini

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1965-12-15

    Action plan presented in this annex includes tasks of the mechanics, electrical and electronic equipment services. It includes a detailed list of planned and preventive maintenance actions related to the heavy water system, technical water system, helium system, reactor core, transportation equipment, hot cells, heating and ventilation systems in the reactor building, power supply system, auxiliary systems in the RA reactor building. [Serbo-Croat] Plan zadataka obuhvata aktivnosti masinske i elektro grupe na preventivnom odrzavanju i planskom remontu sistema teske vode, sistema tehnicke vode, sistema helijuma, centralnog tela reaktora, sistema grejanja i ventilacije, sistema za snabdevanje elektricnom energijom, i ostalih pomocnih sistema u zgradi reaktora RA.

  20. Generic task problem descriptions: Category B, C, and D tasks

    International Nuclear Information System (INIS)

    1978-06-01

    This document contains information relating to Category B, C, and D generic technical activities. The specific information provided for each task includes the reactor type to which the generic issue applies, the NRC division with lead responsibility and a description of the problem to be addressed by the task. Also provided in this document is a listing of Category A generic technical activities and definitions of Priority Categories A, B, C, and D

  1. Motor planning flexibly optimizes performance under uncertainty about task goals.

    Science.gov (United States)

    Wong, Aaron L; Haith, Adrian M

    2017-03-03

    In an environment full of potential goals, how does the brain determine which movement to execute? Existing theories posit that the motor system prepares for all potential goals by generating several motor plans in parallel. One major line of evidence for such theories is that presenting two competing goals often results in a movement intermediate between them. These intermediate movements are thought to reflect an unintentional averaging of the competing plans. However, normative theories suggest instead that intermediate movements might actually be deliberate, generated because they improve task performance over a random guessing strategy. To test this hypothesis, we vary the benefit of making an intermediate movement by changing movement speed. We find that participants generate intermediate movements only at (slower) speeds where they measurably improve performance. Our findings support the normative view that the motor system selects only a single, flexible motor plan, optimized for uncertain goals.

  2. An Investigation of the Effectiveness and Validity of Planning Time in Speaking Test Tasks

    Science.gov (United States)

    Wigglesworth, Gillian; Elder, Cathie

    2010-01-01

    The study described in this article investigated the relationship between three variables in the IELTS oral module--planning, proficiency, and task--and was designed to enhance our understanding of how or whether these variables interact. The study aimed to determine whether differences in performance resulted from 1 or 2 min of planning time. It…

  3. Planning and implementation of Istanbul Technical University TRIGA research reactor program

    International Nuclear Information System (INIS)

    Aybers, N.; Yavuz, H.; Bayulken, A.

    1982-01-01

    The Istanbul Technical University TRIGA Research Reactor at the Institute for Nuclear Energy, which went critical on March 11, 1979 is basically a pulsing type TRIGA Mark - II reactor. Completion of the ITU-TRR contributed to broaden the role of the Institute for Nuclear Energy of the Technical University in Istanbul in the nuclear field by providing for the first time adequate on-campus experimental facilities for nuclear engineering studies to ITU students. The research program which is currently under planning at ITU-NEE encompasses: a) Neutron activation analysis studies by techniques and applications to chemistry, mining, materials research, archaeological and biomedical studies; b) applications of Radioisotopes; c) Radiography with reactor neutron beams; d) Radiation Pulsing

  4. The Task Is Not Enough: Processing Approaches to Task-Based Performance

    Science.gov (United States)

    Skehan, Peter; Xiaoyue, Bei; Qian, Li; Wang, Zhan

    2012-01-01

    This article reports on three research studies, all of which concern second language task performance. The first focuses on planning, and compares on-line and strategic planning as well as task repetition. The second study examines the role of familiarity on task performance, and compares this with conventional strategic planning. The third study…

  5. Dealer Group or Financial Planning Group? A Brief Technical Note

    Directory of Open Access Journals (Sweden)

    Lujer Santacruz

    2011-06-01

    Full Text Available This technical note examines whether the industry practice of using the term dealer group when referring to afinancial planning group contributes to the general perception that financial advisers are not objective whenmaking financial product recommendations. An experimental design carried out through an online survey isused. This is supplemented by a direct comparison survey on the two terminologies. The results provide acase for the industry to adopt a new terminology.

  6. A study of the performance of patients with frontal lobe lesions in a financial planning task.

    Science.gov (United States)

    Goel, V; Grafman, J; Tajik, J; Gana, S; Danto, D

    1997-10-01

    It has long been argued that patients with lesions in the prefrontal cortex have difficulties in decision making and problem solving in real-world, ill-structured situations, particularly problem types involving planning and look-ahead components. Recently, several researchers have questioned our ability to capture and characterize these deficits adequately using just the standard neuropsychological test batteries, and have called for tests that reflect real-world task requirements more accurately. We present data from 10 patients with focal lesions to the prefrontal cortex and 10 normal control subjects engaged in a real-world financial planning task. We also introduce a theoretical framework and methodology developed in the cognitive science literature for quantifying and analysing the complex data generated by problem-solving tasks. Our findings indicate that patient performance is impoverished at a global level but not at the local level. Patients have difficulty in organizing and structuring their problem space. Once they begin problem solving, they have difficulty in allocating adequate effort to each problem-solving phase. Patients also have difficulty dealing with the fact that there are no right or wrong answers nor official termination points in real-world planning problems. They also find it problematic to generate their own feedback. They invariably terminate the session before the details are fleshed out and all the goals satisfied. Finally, patients do not take full advantage of the fact that constraints on real-world problems are negotiable. However, it is not necessary to postulate a 'planning' deficit. It is possible to understand the patients' difficulties in real world planning tasks in terms of the following four accepted deficits: inadequate access to 'structured event complexes', difficulty in generalizing from particulars, failure to shift between 'mental sets', and poor judgment regarding adequacy and completeness of a plan.

  7. Enhancing Effective Stakeholder Participation in Local Groundwater Sustainability Planning through Technical Assistance in California

    Science.gov (United States)

    Weintraub, C.; Christian-Smith, J.; Dobbin, K.; Cullen, K.

    2017-12-01

    This presentation will share content from UCS's new publication, Getting Involved in Groundwater; A Guide to Effective Engagement in California's Groundwater Sustainability Plans, as well as lessons learned from collaborating with community organizations to provide technical assistance to Groundwater Sustainability Agency (GSA) board members and stakeholders in the San Joaquin Valley on Groundwater Sustainability Plan (GSP) development. California's Sustainable Groundwater Management Act (SGMA) mandates extensive stakeholder engagement, presenting an opportunity for unincorporated, low-income communities that have historically been affected by but not included in water decisions. However, implementation requires a concerted, thoughtful effort. Through technical assistance and strategic outreach, the Union of Concerned Scientists (UCS) is working to ensure stakeholder engagement in GSP development is robust, diverse, and supported by the best science available. UCS created the GSP stakeholder engagement guide to equip GSA members, scientists and interested community members to meaningfully engage in the GSP development process. The guide serves as a technical primer on SGMA's GSP process and as a resource for understanding groundwater management in California. The guide is just one component of a larger effort to overcome barriers to effective engagement in sustainable groundwater management, especially those presented by technical information. In April, UCS co-hosted a technical assistance workshop for GSA and advisory committee members in Visalia, CA with the Community Water Center (CWC), a local environmental justice non-profit. The workshop was well received and UCS and the CWC were invited to host a second workshop in June. To deepen this engagement and provide one-on-one technical assistance, UCS developed a program to match relevant water experts in the UCS Science Network with GSA members or involved community members in need of specific technical support

  8. A proposal for a global task planning architecture using the RoboEarth cloud based framework

    OpenAIRE

    Janssen, R.J.M.; Molengraft, van de, M.J.G.; Steinbuch, M.; Di Marco, D.; Zweigle, O.; Levi, P.; Py, F.; Musliner, D.

    2012-01-01

    As robotic systems become more and more capable of assisting in human domains, methods are sought to compose robot executable plans from abstract human instructions. To cope with the semantically rich and highly expressive nature of human instructions, Hierarchical Task Network planning is often being employed along with domain knowledge to solve planning problems in a pragmatic way. Commonly, the domain knowledge is specific to the planning problem at hand, impeding re-use. Therefore this pa...

  9. Noise disturbance in open-plan study environments: a field study on noise sources, student tasks and room acoustic parameters.

    Science.gov (United States)

    Braat-Eggen, P Ella; van Heijst, Anne; Hornikx, Maarten; Kohlrausch, Armin

    2017-09-01

    The aim of this study is to gain more insight in the assessment of noise in open-plan study environments and to reveal correlations between noise disturbance experienced by students and the noise sources they perceive, the tasks they perform and the acoustic parameters of the open-plan study environment they work in. Data were collected in five open-plan study environments at universities in the Netherlands. A questionnaire was used to investigate student tasks, perceived sound sources and their perceived disturbance, and sound measurements were performed to determine the room acoustic parameters. This study shows that 38% of the surveyed students are disturbed by background noise in an open-plan study environment. Students are mostly disturbed by speech when performing complex cognitive tasks like studying for an exam, reading and writing. Significant but weak correlations were found between the room acoustic parameters and noise disturbance of students. Practitioner Summary: A field study was conducted to gain more insight in the assessment of noise in open-plan study environments at universities in the Netherlands. More than one third of the students was disturbed by noise. An interaction effect was found for task type, source type and room acoustic parameters.

  10. Technical-Oriented Enterprise Resource Planning (ERP) Body of Knowledge for Information Systems Programs: Content and Implementation

    Science.gov (United States)

    Boyle, Todd A.

    2007-01-01

    In this article, the author proposes a body of knowledge that the educators can use to incorporate the technical aspects of enterprise resource planning (ERP) into an information systems (IS) program, encapsulated as the ERP technical knowledge framework. To illustrate the application of this framework, the author discusses a course sequence that…

  11. DECOVALEX II PROJECT Technical Report - Task 2C

    International Nuclear Information System (INIS)

    Jing, L.; Stephansson, O.; Chijimatzu, M.; Tsang, C.F.

    1999-05-01

    The DECOVALEX II project is an international co-operative research project supported by a number of national radioactive waste management organizations of different countries. The project studied four tasks: Task 1: numerical simulation of the RCF3 pump test at Sellafield, UK; Task 2: numerical simulation of the in situ T-H-M experiment at Kamaishi Mine, Japan; Task 3: monitoring of current development in rock fracture research; and Task 4: report on treatment of T-H-M processes in Performance Assessment works for nuclear waste repositories. The project started in 1995 and is scheduled to be finalised in March, 1999. This report concerns the Task 2 of the DECOVALEX H project. Task 2 of the DECOVALEX II project is the numerical modelling of the in-situ T-H-M experiment of a fractured rock - buffer - heater system at Kamaishi Mine, Japan. The experiment was carried out inside a test pit drilled in the floor of a 5 x 7 m alcove excavated near an existing drift at the 550 m level. The test pit has a circular cross section of diameter 1.7 m and a depth of 5 m, filled with bentonite which contains an electric heater. Four research teams studied Task 2 with different computational models. The task is divided into three sub-tasks: Task 2A, Task 2B and Task 2C. Task 2A was defined as a blind prediction to the coupled hydro-mechanical behaviour of the fractured rocks due to the excavation of the test pit. The calibration of the numerical models against measured results of pore pressures, flow rates and rock deformation before filling up of the test pit formed Task 2B. These two sub-tasks were performed to establish well calibrated fields of hydraulic conductivity and mechanical deformability of the fractured rocks at the test site. They were necessary for further simulations on interactions between the rock and buffer materials during heating experiments, as required for Task 2C, with a higher level of confidence on rock mass models. Presented in this report is the

  12. DECOVALEX II PROJECT Technical Report - Task 2C

    Energy Technology Data Exchange (ETDEWEB)

    Jing, L.; Stephansson, O. [Royal Inst. of Tech., Stockholm (Sweden). Dept. of Civil and Environmental Engineering; Boergesson, L. [Clay Technology AB, IDEON Research Center, Lund (Sweden); Chijimatzu, M. [Japan Nuclear Cycle Development Inst., Ibaraki (Japan). Waste Management and Fuel Cycle Research Center; Kautsky, F. [Swedish Nuclear Power Inspectorate (SKI), Stockholm (Sweden); Tsang, C.F. [Lawrence Berkeley National Laboratory, Berkeley, CA (United States). Earth Science Div.

    1999-05-01

    The DECOVALEX II project is an international co-operative research project supported by a number of national radioactive waste management organizations of different countries. The project studied four tasks: Task 1: numerical simulation of the RCF3 pump test at Sellafield, UK; Task 2: numerical simulation of the in situ T-H-M experiment at Kamaishi Mine, Japan; Task 3: monitoring of current development in rock fracture research; and Task 4: report on treatment ofT-H-M processes in Performance Assessment works for nuclear waste repositories. The project started in 1995 and is scheduled to be finalised in March, 1999. This report concerns the Task 2 of the DECOVALEX H project. Task 2 of the DECOVALEX II project is the numerical modelling of the in-situ T-H-M experiment of a fractured rock - buffer - heater system at Kamaishi Mine, Japan. The experiment was carried out inside a test pit drilled in the floor of a 5 x 7 m alcove excavated near an existing drift at the 550 m level. The test pit has a circular cross section of diameter 1.7 m and a depth of 5 m, filled with bentonite which contains an electric heater. Four research teams studied Task 2 with different computational models. The task is divided into three sub-tasks: Task 2A, Task 2B and Task 2C. Task 2A was defined as a blind prediction to the coupled hydro-mechanical behaviour of the fractured rocks due to the excavation of the test pit. The calibration of the numerical models against measured results of pore pressures, flow rates and rock deformation before filling up of the test pit formed Task 2B. These two sub-tasks were performed to establish well calibrated fields of hydraulic conductivity and mechanical deformability of the fractured rocks at the test site. They were necessary for further simulations on interactions between the rock and buffer materials during heating experiments, as required for Task 2C, with a higher level of confidence on rock mass models. Presented in this report is the definition

  13. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    Science.gov (United States)

    Hall, Timothy A.; Clancey, William J.; McDonald, Aaron; Toschlog, Jason; Tucker, Tyson; Khan, Ahmed; Madrid, Steven (Eric)

    2011-01-01

    In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.

  14. INIS - The approach and the plan

    International Nuclear Information System (INIS)

    1968-01-01

    Plans for an International Nuclear Information System (INIS) to simplify the task of scientists and engineers trying to cope with the 'information explosion' were reported at the Twelfth Session of the General Conference. Below is a shortened version of a special lecture on the subject given by John E. Woolston, Director of the IAEA Division of Scientific and Technical Information. (author)

  15. US Nuclear Regulatory Commission Human Factors Program Plan. Revision 1

    International Nuclear Information System (INIS)

    1984-09-01

    The purpose of the NRC Human Factors Program Plan (NUREG-0985) is to ensure that proper consideration is given to human factors in the design, operation, and maintenance of nuclear facilities. This revised plan addresses nuclear power plants (NPPs) and describes (1) the technical assistance and research activities planned to provide the technical bases for the resolution of the remaining human factors related tasks described in NUREG-0660, THE NRC Action Plan developed as a result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements; (2) the additional human factors efforts identified during implementation of the Action Plan that should receive NRC attention; (3) conduct of developmental activities specified in NUREG-0985 during FY-83; and (4) the impact of Section 306 of the Nuclear Waste Policy Act of 1982, PL 97-425. The plan represents a systematic and comprehensive approach for addressing human factors concerns important to NPP safety in the FY-84 through FY-86 time frame

  16. An Observation Task Chain Representation Model for Disaster Process-Oriented Remote Sensing Satellite Sensor Planning: A Flood Water Monitoring Application

    Directory of Open Access Journals (Sweden)

    Chao Yang

    2018-03-01

    Full Text Available An accurate and comprehensive representation of an observation task is a prerequisite in disaster monitoring to achieve reliable sensor observation planning. However, the extant disaster event or task information models do not fully satisfy the observation requirements for the accurate and efficient planning of remote-sensing satellite sensors. By considering the modeling requirements for a disaster observation task, we propose an observation task chain (OTChain representation model that includes four basic OTChain segments and eight-tuple observation task metadata description structures. A prototype system, namely OTChainManager, is implemented to provide functions for modeling, managing, querying, and visualizing observation tasks. In the case of flood water monitoring, we use a flood remote-sensing satellite sensor observation task for the experiment. The results show that the proposed OTChain representation model can be used in modeling process-owned flood disaster observation tasks. By querying and visualizing the flood observation task instances in the Jinsha River Basin, the proposed model can effectively express observation task processes, represent personalized observation constraints, and plan global remote-sensing satellite sensor observations. Compared with typical observation task information models or engines, the proposed OTChain representation model satisfies the information demands of the OTChain and its processes as well as impels the development of a long time-series sensor observation scheme.

  17. Demographic Variables and Selective, Sustained Attention and Planning through Cognitive Tasks among Healthy Adults

    Directory of Open Access Journals (Sweden)

    Afsaneh Zarghi

    2011-04-01

    Full Text Available Introduction: Cognitive tasks are considered to be applicable and appropriate in assessing cognitive domains. The purpose of our study is to determine the relationship existence between variables of age, sex and education with selective, sustained attention and planning abilities by means of computerized cognitive tasks among healthy adults. Methods: A cross-sectional study was implemented during 6 months from June to November, 2010 on 84 healthy adults (42 male and 42 female. The whole participants performed computerized CPT, STROOP and TOL tests after being content and trained. Results: The obtained data indicate that there is a significant correlation coefficient between age, sex and education variables (p<0.05. Discussion: The above-mentioned tests can be used to assess selective, sustained attention and planning.

  18. Integrated corridor management initiative : demonstration phase evaluation, San Diego technical capability analysis test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...

  19. Technical basis for the preparation of emergency plans relating to pressurized water reactors

    International Nuclear Information System (INIS)

    L'Homme, A.; Manesse, D.; Gauvain, J.; Crabol, B.

    1989-01-01

    The paper begins by summarizing the standard French approach to management of severe accidents at PWR plants. It goes on to define the source term used as a general basis for emergency plans for protection of the civil population. The paper describes the impact this source term has on both the site and the environment, which is subsequently used as a technical basis for determining the response of the utility and the public authorities concerned. The discussion concludes with a brief outline of the current status of various emergency plans and a description of additional work currently in progress and aimed at improving these plans [fr

  20. Integrated Instrumentation and Control Upgrade Plan

    International Nuclear Information System (INIS)

    Wilkinson, D.; Sun, B.; Wray, L.; Smith, J.

    1992-02-01

    This document presents the first industry-wide integrated research and development plan to support upgrading instrumentation and control (I ampersand C) systems in nuclear power plants in the United States. The plan encompasses both solving obsolescence problems and introducing modern I ampersand C technology into the industry. Accomplishing this plan will provide the technological base to modernize existing plants, as well as bridge the gap to meet Advanced Light Water Reactor (ALWR) requirements for modern I ampersand C systems. This plan defines Research and Development tasks to meet the identified needs for the following technical elements: Instrumentation, Control and Protection, Man-Machine Support Systems, Maintenance, Communications, Verification and Validation, and Specifications and Standards

  1. TECHNICAL DOCUMENT PREPARATION PLAN FOR THE RETRIEVABILITY STRATEGY REPORT

    International Nuclear Information System (INIS)

    P.D. Gehner

    1997-01-01

    The objective of this systems study is to produce a waste removability strategy document that contains sufficient details, recommended design alternatives, and the technical rationale (a) to support Licensing in the development of the License Application Plan, and (b) to provide input in the form of design requirements, for the FY 97 Retrieval Design & Operation activity in support of viability assessment. The intent of this systems study is to support a decision on how to proceed with design with respect to retrievability, regarding the extent to which the repository/waste package designs should accommodate the retrieval option

  2. Examining pre-service science teachers' developing pedagogical design capacity for planning and supporting task-based classroom discussions

    Science.gov (United States)

    Ross, Danielle Kristina

    Teachers face many challenges as we move forward into the age of the Next Generation Science Standards (NGSS) (Achieve, Inc., 2013). The NGSS aim to develop a population of scientifically literate and talented students who can participate in the "innovation-driven economy" (p. 1). In order to meet these goals, teachers must provide students with opportunities to engage in science and engineering practices (SEPs) and learn core ideas of these disciplines. This study followed pre-service secondary science teachers as they participated in a secondary science teacher preparation program intended to support the development of their pedagogical design capacity (Brown, 2009) related to planning and supporting whole-class taskbased discussions. Teacher educators in this program designed an intervention that aimed in supporting this development. This study examined a particular dimension of PDC -- specifically, PSTs effective use of resources to plan science lessons in which students engage in a high demand task, participate in SEPs, and discuss their work in a whole-class setting. In order to examine the effectiveness of the intervention, I had to define PDC a priori. I measured PDC by documenting how/whether PSTs engaged in the following instructional planning practices: developing Learning Goals, selecting and/or designing challenging tasks, anticipating student thinking, planning for monitoring student thinking, imagining the discussion storyline, planning questions, and planning marking strategies. Analyses showed a significant difference between baseline lesson plan scores and Instructional Performance scores. These findings suggest these patterns and changes were directly linked to the teacher preparation program. The mean increase in Instructional Performance scores during the course of the teacher preparation year further supports the effect of the teacher preparation coursework. Pre-service teachers with high pedagogical design capacity continually integrated the

  3. Demographic Variables and Selective, Sustained Attention and Planning through Cognitive Tasks among Healthy Adults

    OpenAIRE

    Afsaneh Zarghi; Zali; A; Tehranidost; M; Mohammad Reza Zarindast; Ashrafi; F; Doroodgar; Khodadadi

    2011-01-01

    Introduction: Cognitive tasks are considered to be applicable and appropriate in assessing cognitive domains. The purpose of our study is to determine the relationship existence between variables of age, sex and education with selective, sustained attention and planning abilities by means of computerized cognitive tasks among healthy adults. Methods: A cross-sectional study was implemented during 6 months from June to November, 2010 on 84 healthy adults (42 male and 42 female). The whole part...

  4. Economic-mathematical substantiation of optimizing the use of technical means, to perform tasks in conditions of uncertainty

    Directory of Open Access Journals (Sweden)

    I. V. Kuksova

    2017-01-01

    Full Text Available In this article a variant of the economic-mathematical substantiation of optimization approaches choice of tools for the survey of airfields, the mechanism of the use of multiple statistical criteria for optimality and usefulness of the decisions taken in this matter, when operating in conditions of uncertainty. Lately in the modern world in many socio-economic areas of human life quite often there are thematic challenges of managerial decision-making in a conflict environment and competition, when several in the General case, reasonable working actors perform collective decision-making, and the benefits of each depends not only on the chosen business strategies, but also from management decisions of other partners and the success of the experiments. Therefore, it is necessary to develop and substantiation of optimum variants of decision of choice of forces and means to perform tasks in conditions of uncertainty, that is also acceptable for military units. The actual problem currently is to optimize system control engineering-airfield security, the components of which perform their tasks under conditions of uncertainty. Analysis of opportunities of technical means (unmanned aerial vehicles shows that under the condition of equipping them with the appropriate equipment can be considered about the possibility of their use as part of a complex of technical means for inspection of airfields after the who enemy action in the runway. Therefore, the scientific goal in this article is to examine the possibilities of using technical means for inspection of airfield engineering and airfield services, and the aim of the study is using mathematical methods to justify the choice of the most effective means, from the point of view of economic cost of its introduction and use when performing tasks in conditions of uncertainty.

  5. Revised action plan of the Maintenance division for 1965, Annex 4

    International Nuclear Information System (INIS)

    Nikolic, M.

    1965-01-01

    The action plan presented in this annex is a revised version of the plan adopted in January 1965. It includes tasks of the mechanics, electrical and electronic equipment services. It includes a detailed list of planned and preventive maintenance actions related to the heavy water system, technical water system, helium system, reactor core, transportation equipment, hot cells, heating and ventilation systems in the reactor building, power supply system, auxiliary systems in the RA reactor building [sr

  6. TECHNICAL CULTURE AND HUMAN AXJOSPHERE

    Directory of Open Access Journals (Sweden)

    ­Krystyna Chałas

    2014-11-01

    Full Text Available Technical culture is the value of each historical period. It is the subject of the ongoing development. While it is a value which is associated with different categories of values, mainly material, cognitive, social. Between culture and these three categories of values ​ there is a cognitive effect. Technical culture determines the quality of human axjosphere. The aim of this study is to show the relationships and dependencies between technical culture and the structures in which a person lives and works. It is mainly about the answer to the question of which values of technical culture are closely related to and what are the inter dependencies? The primary task is to define the concept of the technical culture and to show its teaching essence. The second task boils down to indicate the range of values ​​inherent in the culture of technology, determining the value of the technological culture and values, which are developed by the technical culture. Indication of the interaction between the technical culture and values ​​is the third task.

  7. Task V of the IEA Photovoltaic Power Systems Program: Accomplishments and Activities

    International Nuclear Information System (INIS)

    Bower, Ward

    1999-01-01

    The International Energy Agency (IEA) is an energy forum for 24 industrialized countries and was established in 1974 as an autonomous body within the Organization for Economic Cooperation and Development (OECD). The IEA Photovoltaic Power Systems (PVPS) program implementing agreement was signed in 1993, and renewed for another five years in 1998. Twenty-two countries are collaborating under the auspices of the IEA in the PVPS to address common technical and informational barriers that often limit the rate at which photovoltaic technologies advance into the markets. Task V of the IEA PVPS is entitled ''Grid Interconnection of Building-Integrated and Other Dispersed Photovoltaic Power Systems.'' The task sponsored a workshop in September 1997 on grid-interconnection of photovoltaic systems and is planning a second workshop to address impacts of more penetration of dispersed systems into the utility grid. This paper will summarize the accomplishments of Task V over the last five years and will detail the planned work for the next three years

  8. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  9. Task plan: Temperatures in DWPF Glass Waste Storage Building

    International Nuclear Information System (INIS)

    Hardy, B.J.

    1993-01-01

    The Bechtel National, Inc. Detailed Design Instructions for Structural Design (DDI-02) requires that concrete components of the GWSB not exceed 150 degrees F for structural elements and 200 degrees F locally over a 24 hour period. In addition, the Waste Acceptance Product Specifications (WAPS) sets the maximum post cooldown temperature of the glass waste-form at 400 degrees C. Various scenarios can be postulated which result in elevated glass and concrete temperatures in the GWSB. Therefore, it is important to determine the concrete and glass temperatures during both normal and off-normal conditions. This document details specific tasks required to develop a technically defensible and verifiable methodology for determining maximum temperatures for the waste-forms and the GWSB concrete structures. All models used in this analysis will satisfy Quality Assurance requirements and be defensible to review and oversight committees

  10. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task

    International Nuclear Information System (INIS)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI ampersand SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI ampersand SI field task must include (1) the general health and safety program plan for all WAG 2 RI ampersand SI field activities and (2) a WP/HSC for that particular field task. These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169

  11. Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

    Energy Technology Data Exchange (ETDEWEB)

    Li, Jun [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-10-31

    This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-V Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.

  12. Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

    International Nuclear Information System (INIS)

    Li, Jun

    2016-01-01

    This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-V Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator's approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.

  13. Subjective and objective quantification of physician's workload and performance during radiation therapy planning tasks.

    Science.gov (United States)

    Mazur, Lukasz M; Mosaly, Prithima R; Hoyle, Lesley M; Jones, Ellen L; Marks, Lawrence B

    2013-01-01

    To quantify, and compare, workload for several common physician-based treatment planning tasks using objective and subjective measures of workload. To assess the relationship between workload and performance to define workload levels where performance could be expected to decline. Nine physicians performed the same 3 tasks on each of 2 cases ("easy" vs "hard"). Workload was assessed objectively throughout the tasks (via monitoring of pupil size and blink rate), and subjectively at the end of each case (via National Aeronautics and Space Administration Task Load Index; NASA-TLX). NASA-TLX assesses the 6 dimensions (mental, physical, and temporal demands, frustration, effort, and performance); scores > or ≈ 50 are associated with reduced performance in other industries. Performance was measured using participants' stated willingness to approve the treatment plan. Differences in subjective and objective workload between cases, tasks, and experience were assessed using analysis of variance (ANOVA). The correlation between subjective and objective workload measures were assessed via the Pearson correlation test. The relationships between workload and performance measures were assessed using the t test. Eighteen case-wise and 54 task-wise assessments were obtained. Subjective NASA-TLX scores (P .1), were significantly lower for the easy vs hard case. Most correlations between the subjective and objective measures were not significant, except between average blink rate and NASA-TLX scores (r = -0.34, P = .02), for task-wise assessments. Performance appeared to decline at NASA-TLX scores of ≥55. The NASA-TLX may provide a reasonable method to quantify subjective workload for broad activities, and objective physiologic eye-based measures may be useful to monitor workload for more granular tasks within activities. The subjective and objective measures, as herein quantified, do not necessarily track each other, and more work is needed to assess their utilities. From a

  14. Technical strategy for the management of INEEL spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This report presents evaluations, findings, and recommendations of the Idaho National Engineering and Environmental Laboratory (INEEL) Spent Nuclear Fuel Task Team. The technical strategy developed by the Task Team includes stabilization, near term storage, packaging, transport, and ultimate disposal. Key issues identified and discussed include waste characterization, criticality, packaging, waste form performance, and special fuels. Current plans focus on onsite needs, and include three central elements: (1) resolution of near-term vulnerabilities, (2) consolidation of storage locations, and (3) achieving dry storage in transportable packages. In addition to the Task Team report, appendices contain information on the INEEL spent fuel inventory; regulatory decisions and agreements; and analyses of criticality, packaging, storage, transportation, and system performance of a geological repository. 16 refs., 6 figs., 4 tabs.

  15. Technical strategy for the management of INEEL spent nuclear fuel

    International Nuclear Information System (INIS)

    1997-03-01

    This report presents evaluations, findings, and recommendations of the Idaho National Engineering and Environmental Laboratory (INEEL) Spent Nuclear Fuel Task Team. The technical strategy developed by the Task Team includes stabilization, near term storage, packaging, transport, and ultimate disposal. Key issues identified and discussed include waste characterization, criticality, packaging, waste form performance, and special fuels. Current plans focus on onsite needs, and include three central elements: (1) resolution of near-term vulnerabilities, (2) consolidation of storage locations, and (3) achieving dry storage in transportable packages. In addition to the Task Team report, appendices contain information on the INEEL spent fuel inventory; regulatory decisions and agreements; and analyses of criticality, packaging, storage, transportation, and system performance of a geological repository. 16 refs., 6 figs., 4 tabs

  16. Tasks for the future process and works management

    International Nuclear Information System (INIS)

    Kinn, T.

    1994-01-01

    The actions which have been taken according to the company's targets formulated so far, have lead to complex large scale technical plants. The process and works management becomes more and more difficult due to increasing costs and the strict margins, which have been set by the environmental technology. A complex/An integrated approach at the development of process and works control systems can help considerably to solve these problems due to the dependency on information and partly similar tasks. Before the integrated/complex approach is made the structure and nature of the tasks of all company levels must be analysed and put into concrete terms. The resulting demand of data processing must be adjusted within the frame of a data processing development plan and be realised step by step. In this work the structures, the future tasks and the information demand of process and works management are described. (orig.) [de

  17. Main scientific and technical development tasks for the coal industry during the 8th Five Year Plan and up to the year 2000

    Energy Technology Data Exchange (ETDEWEB)

    Klimek, M.

    1987-05-01

    A general overview is given of the Czechoslovak coal industry from 1975 to 1985, when output increased from 114.4 Mt to 126.6 Mt, with statistics given in graphs and tables covering types of mining, types of coal and types of equipment used. The scientific and technical development plan is reviewed up to the year 2000 which will include intensive geological surveys, more automation, increasing productivity and more efficient use of coking coal. The paper describes in more detail State Scientific Program P01, Extraction and Processing of Selected Types of Fuel, which is broken down into 6 sections: forecasting reserves and geotechnical problems, design problems, surface mining, underground mining, extraction of bitumen and coal processing. This is the first time in the history of the Czechoslovak mining industry that its problems have been incorporated into a State Scientific Program. 6 refs.

  18. Planning performance in schizophrenia patients: a meta-analysis of the influence of task difficulty and clinical and sociodemographic variables.

    Science.gov (United States)

    Knapp, F; Viechtbauer, W; Leonhart, R; Nitschke, K; Kaller, C P

    2017-08-01

    Despite a large body of research on planning performance in adult schizophrenia patients, results of individual studies are equivocal, suggesting either no, moderate or severe planning deficits. This meta-analysis therefore aimed to quantify planning deficits in schizophrenia and to examine potential sources of the heterogeneity seen in the literature. The meta-analysis comprised outcomes of planning accuracy of 1377 schizophrenia patients and 1477 healthy controls from 31 different studies which assessed planning performance using tower tasks such as the Tower of London, the Tower of Hanoi and the Stockings of Cambridge. A meta-regression analysis was applied to assess the influence of potential moderator variables (i.e. sociodemographic and clinical variables as well as task difficulty). The findings indeed demonstrated a planning deficit in schizophrenia patients (mean effect size: ; 95% confidence interval 0.56-0.78) that was moderated by task difficulty in terms of the minimum number of moves required for a solution. The results did not reveal any significant relationship between the extent of planning deficits and sociodemographic or clinical variables. The current results provide first meta-analytic evidence for the commonly assumed impairments of planning performance in schizophrenia. Deficits are more likely to become manifest in problem items with higher demands on planning ahead, which may at least partly explain the heterogeneity of previous findings. As only a small fraction of studies reported coherent information on sample characteristics, future meta-analyses would benefit from more systematic reports on those variables.

  19. Classroom planning and organizing as tasks for the home economics teacher at secondary schools / Lesley Ann Greyvenstein

    OpenAIRE

    Greyvenstein, Lesley Ann

    1986-01-01

    Classroom management, as part-discipline of Educational Management, is a function of the teacher in his role of teacher-manager, consisting of the specific regulative tasks or actions performed by the teacher to facilitate the achievement of effective education within the classroom. The four major classroom managerial tasks for the teacher are the planning, organizing, leading and controlling actions, each consisting of numerous sub-tasks, which, although researched as separ...

  20. Attention, gaze shifting, and dual-task interference from phonological encoding in spoken word planning

    NARCIS (Netherlands)

    Roelofs, A.P.A.

    2008-01-01

    Controversy exists about whether dual-task interference from word planning reflects structural bottleneck or attentional control factors. Here, participants named pictures whose names could or could not be phonologically prepared. and they manually responded to arrows presented away from (Experiment

  1. Development and evaluation of a specialized task taxonomy for spatial planning - A map literacy experiment with topographic maps

    Science.gov (United States)

    Rautenbach, Victoria; Coetzee, Serena; Çöltekin, Arzu

    2017-05-01

    Topographic maps are among the most commonly used map types, however, their complex and information-rich designs depicting natural, human-made and cultural features make them difficult to read. Regardless of their complexity, spatial planners make extensive use of topographic maps in their work. On the other hand, various studies suggest that map literacy among the development planning professionals in South Africa is not very high. The widespread use of topographic maps combined with the low levels of map literacy presents challenges for effective development planning. In this paper we address some of these challenges by developing a specialized task taxonomy based on systematically assessed map literacy levels; and conducting an empirical experiment with topographic maps to evaluate our task taxonomy. In such empirical studies if non-realistic tasks are used, the results of map literacy tests may be skewed. Furthermore, experience and familiarity with the studied map type play a role in map literacy. There is thus a need to develop map literacy tests aimed at planners specifically. We developed a taxonomy of realistic map reading tasks typically executed during the planning process. The taxonomy defines six levels tasks of increasing difficulty and complexity, ranging from recognising symbols to extracting knowledge. We hypothesized that competence in the first four levels indicates functional map literacy. In this paper, we present results from an empirical experiment with 49 map literate participants solving a subset of tasks from the first four levels of the taxonomy with a topographic map. Our findings suggest that the proposed taxonomy is a good reference for evaluating topographic map literacy. Participants solved the tasks on all four levels as expected and we therefore conclude that the experiment based on the first four levels of the taxonomy successfully determined the functional map literacy of the participants. We plan to continue the study for the

  2. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    Science.gov (United States)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  3. Dynamics of the central bottleneck: dual-task and task uncertainty.

    Directory of Open Access Journals (Sweden)

    Mariano Sigman

    2006-07-01

    Full Text Available Why is the human brain fundamentally limited when attempting to execute two tasks at the same time or in close succession? Two classical paradigms, psychological refractory period (PRP and task switching, have independently approached this issue, making significant advances in our understanding of the architecture of cognition. Yet, there is an apparent contradiction between the conclusions derived from these two paradigms. The PRP paradigm, on the one hand, suggests that the simultaneous execution of two tasks is limited solely by a passive structural bottleneck in which the tasks are executed on a first-come, first-served basis. The task-switching paradigm, on the other hand, argues that switching back and forth between task configurations must be actively controlled by a central executive system (the system controlling voluntary, planned, and flexible action. Here we have explicitly designed an experiment mixing the essential ingredients of both paradigms: task uncertainty and task simultaneity. In addition to a central bottleneck, we obtain evidence for active processes of task setting (planning of the appropriate sequence of actions and task disengaging (suppression of the plan set for the first task in order to proceed with the next one. Our results clarify the chronometric relations between these central components of dual-task processing, and in particular whether they operate serially or in parallel. On this basis, we propose a hierarchical model of cognitive architecture that provides a synthesis of task-switching and PRP paradigms.

  4. 77 FR 19280 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Science.gov (United States)

    2012-03-30

    ... concerns that current system data quality might not allow for an AC optimal power flow model to be properly... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference: Increasing Real-Time and Day- Ahead Market Efficiency Through Improved Software Take notice that Commission staff will...

  5. Engineering task plan for purged light system

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    A purged, closed circuit television system is currently used to video inside of waste tanks. The video is used to support inspection and assessment of the tank interiors, waste residues, and deployed hardware. The system is also used to facilitate deployment of new equipment. A new light source has been requested by Characterization Project Operations (CPO) for the video system. The current light used is mounted on the camera and provides 75 watts of light, which is insufficient for clear video. Other light sources currently in use on the Hanford site either can not be deployed in a 4-inch riser or do not meet the ignition source controls. The scope of this Engineering Task Plan is to address all activities associated with the specification and procurement of a light source for use with the existing CPO video equipment. The installation design change to tank farm facilities is not within the scope of this ETP

  6. In situ sampling cart development engineering task plan

    International Nuclear Information System (INIS)

    DeFord, D.K.

    1995-01-01

    This Engineering Task Plan (ETP) supports the development for facility use of the next generation in situ sampling system for characterization of tank vapors. In situ sampling refers to placing sample collection devices (primarily sorbent tubes) directly into the tank headspace, then drawing tank gases through the collection devices to obtain samples. The current in situ sampling system is functional but was not designed to provide the accurate flow measurement required by today's data quality objectives (DQOs) for vapor characterization. The new system will incorporate modern instrumentation to achieve much tighter control. The next generation system will be referred to in this ETP as the New In Situ System (NISS) or New System. The report describes the current sampling system and the modifications that are required for more accuracy

  7. Training and qualification of the auxiliaries of operation using the methodology On the Job Training (OJT) and Task Performance Evaluation (TPE); Formacion y culificacion de los auxiliares de operacion mediante la metodologia On the Job Training (OJT) y Task Performance Evaluation (TPE)

    Energy Technology Data Exchange (ETDEWEB)

    Martinez Casado, J.

    2015-07-01

    On the Job Training (OJT) and Task Performance Evaluation (TPE). This plan has been developed and put in practice entirely, by a group of experienced auxiliary operation that have distinguished themselves by their professionalism, knowledge of the work, technical expertise and commitment to nuclear safety. (Author)

  8. Spray nozzle pattern test for the DWPF HEME Task QA Plan

    International Nuclear Information System (INIS)

    Lee, L.

    1991-01-01

    The DWPF melter off-gas systems have two High Efficiency Mist Eliminators (HEME) upstream of the High-Efficiency Particulates Air filters (HEPA) to remove fine mists and particulates from the off-gas. To have an acceptable filter life and an efficient operation, an air atomized water is spray on the HEME. The water spray keeps the HEME wet and dissolves the soluble particulates and enhances and HEME efficiency. DWPF Technical asked SRL to determine the conditions which will give satisfactory atomization and distribution of water so that the HEME will operate efficiently. The purpose of this document is to identify, QA controls to be applied in the pursuit of this task (WSRC-RP-91-1151)

  9. NetView technical research

    Science.gov (United States)

    1993-01-01

    This is the Final Technical Report for the NetView Technical Research task. This report is prepared in accordance with Contract Data Requirements List (CDRL) item A002. NetView assistance was provided and details are presented under the following headings: NetView Management Systems (NMS) project tasks; WBAFB IBM 3090; WPAFB AMDAHL; WPAFB IBM 3084; Hill AFB; McClellan AFB AMDAHL; McClellan AFB IBM 3090; and Warner-Robins AFB.

  10. The Physikalisch-Technische Bundesanstalt PTB (physical-technical Federal institution) - research institute and highest technical authority

    International Nuclear Information System (INIS)

    Klages, H.

    1976-01-01

    The PTB Braunschweig and Berlin is a Federal institution for the natural sciences and engineering and the highest technical authority for measurements. It is subject to the directions of the Federal Ministry for Economic Affairs. Its main tasks are representation, maintenance and development of physical units and, in connection with this, research, examinations, and granting permissions for calibration measuring equipment, as well as examinations of building types and permissions. The types of measuring equipment are represented. Many examinations are carried out on a voluntary basis. The advisory activities and the PTB's publications are also reported on. An organizational plan informs of the structure of the PTB. (orig.) [de

  11. Applied Railway Optimization in Production Planning at DSB-S-tog - Tasks, Tools and Challenges

    DEFF Research Database (Denmark)

    Clausen, Jens

    2007-01-01

    these conflicting goals. S-tog has therefore on the strategic level decided to use software with optimization capabilities in the planning processes. We describe the current status for each activity using optimization or simulation as a tool: Timetable evaluation, rolling stock planning, and crew scheduling...... to the customers, and has concurrently been met with demands for higher efficiency in the daily operation. The plans of timetable, rolling stock and crew must hence allow for a high level of customer service, be efficient, and be robust against disturbances of operations. It is a highly non-trivial task to meet....... In addition we describe on-going efforts in using mathematical models in activities such as timetable design and work-force planning. We also identify some organizatorial key factors, which have paved the way for extended use of optimization methods in railway production planning....

  12. Planning abilities and chess: a comparison of chess and non-chess players on the Tower of London task.

    Science.gov (United States)

    Unterrainer, J M; Kaller, C P; Halsband, U; Rahm, B

    2006-08-01

    Playing chess requires problem-solving capacities in order to search through the chess problem space in an effective manner. Chess should thus require planning abilities for calculating many moves ahead. Therefore, we asked whether chess players are better problem solvers than non-chess players in a complex planning task. We compared planning performance between chess ( N=25) and non-chess players ( N=25) using a standard psychometric planning task, the Tower of London (ToL) test. We also assessed fluid intelligence (Raven Test), as well as verbal and visuospatial working memory. As expected, chess players showed better planning performance than non-chess players, an effect most strongly expressed in difficult problems. On the other hand, they showed longer planning and movement execution times, especially for incorrectly solved trials. No differences in fluid intelligence and verbal/visuospatial working memory were found between both groups. These findings indicate that better performance in chess players is associated with disproportionally longer solution times, although it remains to be investigated whether motivational or strategic differences account for this result.

  13. Task QA plan for Modified Prototypic Hydragard trademark Sampler Overflow System Demonstration at TNX

    International Nuclear Information System (INIS)

    Snyder, T.K.

    1993-01-01

    The primary objective of this task is to evaluate the proposed design modifications to the sample system, including the adequacy of the recommended eductor and the quality of samples obtained from the modified system. Presently, the sample streams are circulated from the originating tank, through a Hydragard trademark sampler system, and back to the originating tank. The overflow from the Hydragard trademark sampler flows to the Recycle Collection Tank (RCT). This report outlines the planned quality assurance controls for the design modification task, including organization and personnel, surveillances, and records package

  14. Engineering task plan for the annual revision of the rotary mode core sampling system safety equipment list

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Task Plan addresses an effort to provide an update to the RMCS Systems 3 and 4 SEL and DCM in order to incorporate the changes to the authorization basis implemented by HNF-SD-WM-BIO-001, Rev. 0 (Draft), Addendum 5 , Safety Analysis for Rotary Mode Core Sampling. Responsibilities, task description, cost estimate, and schedule are presented

  15. Using task performance to inform treatment planning for youth with ADHD: A systematic review.

    Science.gov (United States)

    Molitor, Stephen J; Langberg, Joshua M

    2017-12-01

    The role that neuropsychological task performance plays in the assessment of Attention-Deficit/Hyperactivity Disorder (ADHD) is currently ambiguous, and findings are mixed regarding whether tasks have validity for diagnosing the disorder. Irrespective of their validity for diagnosing ADHD, neuropsychological tasks could provide valuable information to mental health professionals if they can inform recommendations for treatment targets and modalities. Therefore, this review sought to synthesize the available evidence related to the use of neuropsychological task performance as a tool for informing treatment planning for youth with ADHD. Reviewed studies focused on examinations of associations between task performance and academic, social, and health outcomes, as well as response to treatment. Twenty-five relevant studies using samples of youth diagnosed with ADHD in clinical, community, and school settings were identified. Review of the evidence suggests that task performance may be useful in identifying individuals with ADHD at risk for academic impairment. However, the evidence is less compelling for identifying youth at risk for impaired social functioning or poor health outcomes. The review also found that task performance is likely useful for predicting response to treatment with methylphenidate. Across studies, evidence indicated that interpreting task performance in an integrated manner, such as a factor score or mean score, was more consistently useful for predicting outcomes of interest than interpreting performance from a single task. Implications for the use of tasks in ADHD assessments are discussed, and future directions are outlined for further examining the clinical utility of task performance. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. The Effects of Simultaneous Use of Careful Online Planning and Task Repetition on Accuracy, Complexity, and Fluency in EFL Learners' Oral Production

    Science.gov (United States)

    Ahmadian, Mohammad Javad; Tavakoli, Mansoor

    2011-01-01

    This article reports on a study that was primarily aimed at investigating the effects of simultaneous use of careful online planning and task repetition on accuracy, complexity, and fluency in the oral production of learners of English as a foreign language (EFL). The effects of four planning and task repetition conditions (i.e. careful online…

  17. Engineering task plan for Tanks 241-AN-103, 104, 105 color video camera systems

    International Nuclear Information System (INIS)

    Kohlman, E.H.

    1994-01-01

    This Engineering Task Plan (ETP) describes the design, fabrication, assembly, and installation of the video camera systems into the vapor space within tanks 241-AN-103, 104, and 105. The one camera remotely operated color video systems will be used to observe and record the activities within the vapor space. Activities may include but are not limited to core sampling, auger activities, crust layer examination, monitoring of equipment installation/removal, and any other activities. The objective of this task is to provide a single camera system in each of the tanks for the Flammable Gas Tank Safety Program

  18. Conversion of NEK standard technical specifications into improved technical specifications

    International Nuclear Information System (INIS)

    Glaser, B.

    2003-01-01

    Neck is currently using a standard format of operation's Technical Specifications - STS (based on NUREG-0452), which are planned to be converted into Improved Technical Specifications - ITS (based on NUREG-1431). To facilitate the development of individual ITS, each reactor vendor owners group (OG) and the NRC staff developed improved standard TS (ISTS). For Westinghouse plants, the ISTS are published as NUREG-1431, and this document is going to be the basis for the new NEK ITS. It has been recognized that nuclear safety in all plants would benefit from improvement and standardization of ITS, so this was also addressed and recognized by the NRC. There are several plants around Europe and US, which have replaced the format into ITS which brings a lot of improvements and practical value in operations. The main objective of conversion is to completely rewrite, reformat, and streamline the existing STS. Emphasis is placed on human factors principles to improve clarity and understanding. The Bases section will be significantly expanded to clarify and better explain the purpose and foundation of each specification. There might be some proposed changes to the existing STS that deviated from the ITS in NUREG-1431 and constitute a relaxation of the existing STS. Each of these additional proposed changes will be described and evaluated in amendment application and justified on a case-by-case basis. Since the NEK is going to operate for more than 20 year without considering life extension, such conversion will be beneficial for operation personnel as well as regulation, surveillance and focus on operation's safety. At the present, only preliminary plan of STS conversion exists, showing the time frame of approximately 2 years of conversion process and numerous tasks that need to be performed. The plan is to begin with process in year 2004 and finish project in 2006, which means use of new ITS in main control room in year 2007. Beside the main process of conversion, there are

  19. American Samoa Initial Technical Assessment Report

    Energy Technology Data Exchange (ETDEWEB)

    Busche, S.; Conrad, M.; Funk, K.; Kandt, A.; McNutt, P.

    2011-09-01

    This document is an initial energy assessment for American Samoa, the first of many steps in developing a comprehensive energy strategy. On March 1, 2010, Assistant Secretary of the Interior Tony Babauta invited governors and their staff from the Interior Insular Areas to meet with senior principals at the National Renewable Energy Laboratory (NREL). Meeting discussions focused on ways to improve energy efficiency and increase the deployment of renewable energy technologies in the U.S. Pacific Territories. In attendance were Governors Felix Camacho (Guam), Benigno Fitial (Commonwealth of the Northern Mariana Islands), and Togiola Tulafono, (American Samoa). This meeting brought together major stakeholders to learn and understand the importance of developing a comprehensive strategic plan for implementing energy efficiency measures and renewable energy technologies. For several decades, dependence on fossil fuels and the burden of high oil prices have been a major concern but never more at the forefront as today. With unstable oil prices, the volatility of fuel supply and the economic instability in American Samoa, energy issues are a high priority. In short, energy security is critical to American Samoa's future economic development and sustainability. Under an interagency agreement, funded by the Department of Interior's Office of Insular Affairs, NREL was tasked to deliver technical assistance to the islands of American Samoa. Technical assistance included conducting an initial technical assessment to define energy consumption and production data, establish an energy consumption baseline, and assist with the development of a strategic plan. The assessment and strategic plan will be used to assist with the transition to a cleaner energy economy. NREL provided an interdisciplinary team to cover each relevant technical area for the initial energy assessments. Experts in the following disciplines traveled to American Samoa for on-island site assessments: (1

  20. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    Energy Technology Data Exchange (ETDEWEB)

    Vigil-Holterman, Luciana R. [Los Alamos National Laboratory

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

  1. Life sciences payloads analyses and technical program planning studies. [project planning of space missions of space shuttles in aerospace medicine and space biology

    Science.gov (United States)

    1976-01-01

    Contractural requirements, project planning, equipment specifications, and technical data for space shuttle biological experiment payloads are presented. Topics discussed are: (1) urine collection and processing on the space shuttle, (2) space processing of biochemical and biomedical materials, (3) mission simulations, and (4) biomedical equipment.

  2. Development of a software concept for computer-aided technical detail planning for machines in German hard coal mining; Entwicklung eines Softwarekonzeptes fuer rechnergestuetzte maschinentechnische Datailplanung im deutschen Steinkohlenbergbau

    Energy Technology Data Exchange (ETDEWEB)

    Borstell, D

    1994-12-31

    CAD systems have long been an aid in German hard coal mining for reducing costs in all technical planning tasks. The use of computers will offer as yet unused possibilities for further cost savings in the future. For this purpose, this book introduces a new software concept for the technical planning for machines in the mines of the Ruhr. By the continued and thorough use of the potential of modern computer techniques, by the application of the knowledge of planning science orientated towards practice and by transferring computer-aided planning applications from other branches of industry, a further contribution is to be made to reducing costs in technical planning. The heart of the future technical planning workplace will be a graphically orientated surface with the three-dimensional representation of the pit structure on the screen. On this surface, after choosing the work area in the pit structure, there is access to the available software tools. These support the planning engineer in information and design work (connection to databank, 2D/3D-CAD, libraries of operating means and standard parts) and give support to the method of procedure (through expert systems, sample specifications, checklists). They will also offer help in inspection and decision-making (by simulation and calculation routines, expert systems) and in supporting publicity activities (text processing, desktop publishing). The computer-aided planning system of the future will develop from the two-dimensional design environment usual today into a comprehensive integrated 3D engineering system. (orig.) [Deutsch] CAD-Systeme sind im deutschen Steinkohlenbergbau seit Jahren wichtige Hilfsmittel zur Kostenreduzierung bei allen technischen Planungsaufgaben. Auch in Zukunft wird der Einsatz von Rechnern noch ungenutzte Moeglichkeiten fuer weitere Kosteneinsparungen bieten. Zu diesem Zweck wird in der vorliegenden Arbeit ein neues Softwarekonzept fuer die maschinentechnische Planung in den Stabsstellen

  3. Relationship between non-technical skills and technical performance during cardiopulmonary resuscitation: does stress have an influence?

    Science.gov (United States)

    Krage, Ralf; Zwaan, Laura; Tjon Soei Len, Lian; Kolenbrander, Mark W; van Groeningen, Dick; Loer, Stephan A; Wagner, Cordula; Schober, Patrick

    2017-11-01

    Non-technical skills, such as task management, leadership, situational awareness, communication and decision-making refer to cognitive, behavioural and social skills that contribute to safe and efficient team performance. The importance of these skills during cardiopulmonary resuscitation (CPR) is increasingly emphasised. Nonetheless, the relationship between non-technical skills and technical performance is poorly understood. We hypothesise that non-technical skills become increasingly important under stressful conditions when individuals are distracted from their tasks, and investigated the relationship between non-technical and technical skills under control conditions and when external stressors are present. In this simulator-based randomised cross-over study, 30 anaesthesiologists and anaesthesia residents from the VU University Medical Center, Amsterdam, the Netherlands, participated in two different CPR scenarios in random order. In one scenario, external stressors (radio noise and a distractive scripted family member) were added, while the other scenario without stressors served as control condition. Non-technical performance of the team leader and technical performance of the team were measured using the 'Anaesthetists' Non-technical Skill' score and a recently developed technical skills score. Analysis of variance and Pearson correlation coefficients were used for statistical analyses. Non-technical performance declined when external stressors were present (adjusted mean difference 3.9 points, 95% CI 2.4 to 5.5 points). A significant correlation between non-technical and technical performance scores was observed when external stressors were present (r=0.67, 95% CI 0.40 to 0.83, ptechnical performance score (task management, team working, situation awareness, decision-making). During CPR with external stressors, the team's technical performance is related to the non-technical skills of the team leader. This may have important implications for training of

  4. The Relationship between Working Memory Capacity and L2 Oral Performance under Task-Based Careful Online Planning Condition

    Science.gov (United States)

    Ahmadian, Mohammad Javad

    2012-01-01

    The study reported in this article aimed to investigate the way working memory capacity (WMC) interacts with careful online planning--a task-based implementation variable--to affect second language (L2) speech production. This issue is important to teachers, because it delves into one of the possible task-based implementation variables and thus…

  5. Task plan for test of PRBT prototypic liquid sampler

    International Nuclear Information System (INIS)

    Jenkins, W.J.

    1992-01-01

    The primary objective of this task is to determine just how representative Precipitate Reactor Bottom Tank (PRBT) samples taken from the Hydragard trademark prototypic liquid sampler are of the in-tank contents and also to determine the homogeneity of the in-tank contents. This shall be accomplished by a statistical design study sampling plan for paired contrasts of the analysis results of samples taken from: (1) the Hydragard trademark prototypic liquid sampler paired with the more fundamental grab sampler at the lower elevation for the Hydragard trademark prototypic liquid sampler accuracy and (2) the grab sampler at the lower elevation paired with the grab sampler at the upper elevation for the in-tank homogeneity. These measurements are paired together to sharpen the contrast so that, as nearly as possible, only the conditions of the effect under study will differ between the two. This ''split-plot'' arrangement provides increased precision for the contrast under study by canceling out common extraneous effects, thereby enabling the detection of smaller effects. The secondary objective of the task is to determine the level of influence of the major contributors to the overall uncertainty in the sample preparation and measurement process. These major steps include: preparation method (H 2 SO 4 -HF Titanium dissolution); aliquoting and dilution within a dissolution; measurement and long-term behavior of the ICP and AA instruments, as monitored by the measurement of standards and blanks embedded within each block of samples for the measurement sequence. This sampling task, therefore, is mostly devoted to determining the sampler characteristics and is not intended to provide a comprehensive estimate of the overall uncertainty affecting DWPF sample analysis in routine operation

  6. Training and qualification of the auxiliaries of operation using the methodology On the Job Training (OJT) and Task Performance Evaluation (TPE)

    International Nuclear Information System (INIS)

    Martinez Casado, J.

    2015-01-01

    On the Job Training (OJT) and Task Performance Evaluation (TPE). This plan has been developed and put in practice entirely, by a group of experienced auxiliary operation that have distinguished themselves by their professionalism, knowledge of the work, technical expertise and commitment to nuclear safety. (Author)

  7. Gas and liquid sampling for closed canisters in KW Basin - Work Plan

    International Nuclear Information System (INIS)

    Pitkoff, C.C.

    1995-01-01

    Work Plan for the design and fabrication of gas/liquid sampler for closed canister sampling in KW Basin. This document defines the tasks associated with the design, fabrication, assembly, and acceptance testing equipment necessary for gas and liquid sampling of the Mark I and Mark II canisters in the K-West basin. The sampling of the gas space and the remaining liquid inside the closed canisters will be used to help understand any changes to the fuel elements and the canisters. Specifically, this work plan will define the scope of work and required task structure, list the technical requirements, describe design configuration control and verification methodologies, detail quality assurance requirements, and present a baseline estimate and schedule

  8. Final Technical Report Transport Task Force Activities

    International Nuclear Information System (INIS)

    P.W. Terry

    2006-01-01

    The Transport Task Force has functioned as the primary scientific organization in the area of magnetic-fusion confinement and transport since its inception in 1988. It has defined and set research directions, coordinated broad research efforts, advocated new funding initiatives, and created a highly successful and widely admired interactive culture between experiment, theory and modeling. The Transport Task Force carries out its activities under the direction of its chair and the Executive Committee. The Executive Committee is comprised of the leaders and deputy leaders of the scientific working groups. The working groups are structured and organized according to research needs and priorities and have been organized around the areas of Core Transport, H Mode and Pedestal, Fast Particle Transport, Transient Transport Phenomena, and Modeling and Simulation. A steering committee provides advise on TTF activities. Further information on the working groups and the structure and management of the TTF can be found at http://psfcwww2.psfc.mit.edu/ttf/index.html. The TTF holds an annual workshop. A summary of the workshops held during the period of this report is given in Appendix I. During the period of this report the Transport Task Force was involved in several significant activities. Foremost of these was a sweeping review of the status of transport science, the key research tasks for progress during the next 5-10 years, and a proposal for a funding initiative to ensure application of adequate resources to these problems. The conclusions of this study were incorporated into a white paper, which is copied below in Appendix II. Other significant activities have included the introduction of an extended, ongoing discussion on verification and validation as a requisite for defining and codifying the path toward predictive capability, the orchestration of a gradual shift of focus from ion thermal confinement to electron thermal confinement, and a joining of efforts on edge

  9. Phonological and Executive Working Memory in L2 Task-Based Speech Planning and Performance

    Science.gov (United States)

    Wen, Zhisheng

    2016-01-01

    The present study sets out to explore the distinctive roles played by two working memory (WM) components in various aspects of L2 task-based speech planning and performance. A group of 40 post-intermediate proficiency level Chinese EFL learners took part in the empirical study. Following the tenets and basic principles of the…

  10. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02

    International Nuclear Information System (INIS)

    Pickett, S.L.; Morton, S.L.

    1992-06-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG ampersand G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the ERP. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP

  11. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02

    Energy Technology Data Exchange (ETDEWEB)

    Pickett, S.L.; Morton, S.L.

    1992-06-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the ERP. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  12. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02

    Energy Technology Data Exchange (ETDEWEB)

    Pickett, S.L.; Morton, S.L.

    1992-06-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the ERP. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  13. Technical Writing Tips

    Science.gov (United States)

    Kennedy, Patrick M.

    2004-01-01

    The main reason engineers, technicians, and programmers write poor technical documents is because they have had little training or experience in that area. This article addresses some of the basics that students can use to master technical writing tasks. The article covers the most common problems writers make and offers suggestions for improving…

  14. Younger apes and human children plan their moves in a maze task.

    Science.gov (United States)

    Völter, Christoph J; Call, Josep

    2014-02-01

    Planning defined as the predetermination of a sequence of actions towards some goal is crucial for complex problem solving. To shed light on the evolution of executive functions, we investigated the ontogenetic and phylogenetic origins of planning. Therefore, we presented all four great apes species (N=12) as well as 4- and 5-year-old human preschoolers (N=24) with a vertical maze task. To gain a reward placed on the uppermost level of the maze, subjects had to move the reward to the bottom through open gaps situated at each level of the maze. In total, there were ten gaps located over three of the maze's levels, and free passage through these gaps could be flexibly blocked using multiple traps. Due to the decision tree design of the maze, the subjects had to plan their actions depending on the trap configuration up to two steps ahead to successfully retrieve the reward. We found that (1) our measure of planning was negatively correlated with age in nonhuman apes, (2) younger apes as well as 5-year-old children planned their moves up to two steps ahead whereas 4-year-olds were limited to plan one step ahead, and (3) similar performance but different underlying limitations between apes and children. Namely, while all species of nonhuman apes were limited by a lack of motor control, human children exhibited a shortage in shifting their attention across a sequence of subgoals. Copyright © 2013 Elsevier B.V. All rights reserved.

  15. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements

  16. Technical Basis for Radiological Emergency Plan Annex for WTD Emergency Response Plan: West Point Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Hickey, Eva E.; Strom, Daniel J.

    2005-08-01

    Staff of the King County Wastewater Treatment Division (WTD) have concern about the aftermath of a radiological dispersion event (RDE) leading to the introduction of significant quantities of radioactive material into the combined sanitary and storm sewer system in King County, Washington. Radioactive material could come from the use of a radiological dispersion device (RDD). RDDs include "dirty bombs" that are not nuclear detonations but are explosives designed to spread radioactive material (National Council on Radiation Protection and Measurements (NCRP) 2001). Radioactive material also could come from deliberate introduction or dispersion of radioactive material into the environment, including waterways and water supply systems. This document, Volume 3 of PNNL-15163 is the technical basis for the Annex to the West Point Treatment Plant (WPTP) Emergency Response Plan related to responding to a radiological emergency at the WPTP. The plan primarily considers response to radioactive material that has been introduced in the other combined sanitary and storm sewer system from a radiological dispersion device, but is applicable to any accidental or deliberate introduction of materials into the system.

  17. Effects of Information Visualization on Older Adults' Decision-Making Performance in a Medicare Plan Selection Task: A Comparative Usability Study.

    Science.gov (United States)

    Price, Margaux M; Crumley-Branyon, Jessica J; Leidheiser, William R; Pak, Richard

    2016-06-01

    Technology gains have improved tools for evaluating complex tasks by providing environmental supports (ES) that increase ease of use and improve performance outcomes through the use of information visualizations (info-vis). Complex info-vis emphasize the need to understand individual differences in abilities of target users, the key cognitive abilities needed to execute a decision task, and the graphical elements that can serve as the most effective ES. Older adults may be one such target user group that would benefit from increased ES to mitigate specific declines in cognitive abilities. For example, choosing a prescription drug plan is a necessary and complex task that can impact quality of life if the wrong choice is made. The decision to enroll in one plan over another can involve comparing over 15 plans across many categories. Within this context, the large amount of complex information and reduced working memory capacity puts older adults' decision making at a disadvantage. An intentionally designed ES, such as an info-vis that reduces working memory demand, may assist older adults in making the most effective decision among many options. The objective of this study is to examine whether the use of an info-vis can lower working memory demands and positively affect complex decision-making performance of older adults in the context of choosing a Medicare prescription drug plan. Participants performed a computerized decision-making task in the context of finding the best health care plan. Data included quantitative decision-making performance indicators and surveys examining previous history with purchasing insurance. Participants used a colored info-vis ES or a table (no ES) to perform the decision task. Task difficulty was manipulated by increasing the number of selection criteria used to make an accurate decision. A repeated measures analysis was performed to examine differences between the two table designs. Twenty-three older adults between the ages of 66

  18. Transformation of technical infrastructure

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev

    1998-01-01

    article about the need of new planning forums in order to initiate transformations with in management of large technical systems for energy, waste and water supply.......article about the need of new planning forums in order to initiate transformations with in management of large technical systems for energy, waste and water supply....

  19. Automated radiotherapy treatment plan integrity verification

    Energy Technology Data Exchange (ETDEWEB)

    Yang Deshan; Moore, Kevin L. [Department of Radiation Oncology, School of Medicine, Washington University in Saint Louis, St. Louis, Missouri 63110 (United States)

    2012-03-15

    Purpose: In our clinic, physicists spend from 15 to 60 min to verify the physical and dosimetric integrity of radiotherapy plans before presentation to radiation oncology physicians for approval. The purpose of this study was to design and implement a framework to automate as many elements of this quality control (QC) step as possible. Methods: A comprehensive computer application was developed to carry out a majority of these verification tasks in the Philips PINNACLE treatment planning system (TPS). This QC tool functions based on both PINNACLE scripting elements and PERL sub-routines. The core of this technique is the method of dynamic scripting, which involves a PERL programming module that is flexible and powerful for treatment plan data handling. Run-time plan data are collected, saved into temporary files, and analyzed against standard values and predefined logical rules. The results were summarized in a hypertext markup language (HTML) report that is displayed to the user. Results: This tool has been in clinical use for over a year. The occurrence frequency of technical problems, which would cause delays and suboptimal plans, has been reduced since clinical implementation. Conclusions: In addition to drastically reducing the set of human-driven logical comparisons, this QC tool also accomplished some tasks that are otherwise either quite laborious or impractical for humans to verify, e.g., identifying conflicts amongst IMRT optimization objectives.

  20. Automated radiotherapy treatment plan integrity verification

    International Nuclear Information System (INIS)

    Yang Deshan; Moore, Kevin L.

    2012-01-01

    Purpose: In our clinic, physicists spend from 15 to 60 min to verify the physical and dosimetric integrity of radiotherapy plans before presentation to radiation oncology physicians for approval. The purpose of this study was to design and implement a framework to automate as many elements of this quality control (QC) step as possible. Methods: A comprehensive computer application was developed to carry out a majority of these verification tasks in the Philips PINNACLE treatment planning system (TPS). This QC tool functions based on both PINNACLE scripting elements and PERL sub-routines. The core of this technique is the method of dynamic scripting, which involves a PERL programming module that is flexible and powerful for treatment plan data handling. Run-time plan data are collected, saved into temporary files, and analyzed against standard values and predefined logical rules. The results were summarized in a hypertext markup language (HTML) report that is displayed to the user. Results: This tool has been in clinical use for over a year. The occurrence frequency of technical problems, which would cause delays and suboptimal plans, has been reduced since clinical implementation. Conclusions: In addition to drastically reducing the set of human-driven logical comparisons, this QC tool also accomplished some tasks that are otherwise either quite laborious or impractical for humans to verify, e.g., identifying conflicts amongst IMRT optimization objectives.

  1. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball and W. Zeuner

    2010-01-01

    Overview Once again, the bulk of this article reviews the intense activity of a recently completed shutdown, which, although quite unforeseeable until a few weeks before it started, proved by its success that our often advertised capability to conduct major maintenance within a two month period is real. Although safely completed, on-time to remarkable precision, the activity was not without incident, and highlighted our dependence on many experienced, specialist teams and their precise choreography. Even after the yoke was safely closed, magnet re-commissioning and beampipe pumpdown showed new and thought-provoking behaviour. The struggle to maintain adequate technical resources will be a pre-occupation over the coming months, in parallel with the start of truly sustained operation, for which various procedures are still being put in place. Planning for future shutdowns must now become a high priority, with many working groups and task forces already in existence to prepare infrastructure improvements and to...

  2. Development of whole-building energy design targets for commercial buildings: Phase 1, Planning: Volume 2, Technical report

    Energy Technology Data Exchange (ETDEWEB)

    Crawley, D.B.; Briggs, R.S.; Jones, J.W.; Seaton, W.W.; Kaufman, J.E.; Deringer, J.J.; Kennett, E.W.

    1987-08-01

    This is the second volume of the Phase 1 report and discusses the 10 tasks performed in Phase 1. The objective of this research is to develop a methodology for setting energy design targets to provide voluntary guidelines for the buildings industry. The whole-building energy targets project is being conducted at the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) to encourage the construction of energy-efficient buildings by informing designers and owners about cost-effective goals for energy use in new commercial buildings. The outcome of this research will be a flexible methodology for setting such targets. The tasks are listed and discussed in this report as follows: Task 1 - Develop Detailed Project Goals and Objectives; Task 2 - Establish Buildings-Industry Liaison; Task 3 - Develop Approaches to the Energy Targets Model, Building Operations, and Climate; Task 4 - Develop an Approach for Treating Economic Considerations; Task 5 - Develop an Approach for Treating Energy Sources; Task 6 - Collect Energy-Use Data; Task 7 - Survey Energy Expert Opinion; Task 8 - Evaluation Procedure Specification and Integration; Task 9 - Phase 1 Report Development; and Task 10 - Phase 1 Review Planning.

  3. Frame, methods and instruments for energy planning in the new economic order of electricity economics

    International Nuclear Information System (INIS)

    Stigler, H.

    1999-01-01

    The introduction of the new economic order of the electricity economy causes new focal tasks for the individual market participants and therefore new requirements for planning. As a precondition for energy planning, the Internal Market Electricity Directive and the ElWOG are examined and the tasks for the market participants are derived. Liberalization raises the risks for the enterprises. Increasing competition sets up higher requirements for planning. The planning instruments have no longer the destination of minimum costs but have to maximize the results of the enterprise. Price fixing requires a raised alignment to marginal costs considerations. Increasing electricity trade requires the introduction of new planning instruments. Further new tasks refer to electricity transfer via other networks and especially to congestion management. New chances but also new risks arise for the renewable energy sources. From the market result new requirements for the planning instruments. The basics in this respect are prepared and concrete examples from practice are submitted. Models of enterprises are developed, which consist of a technical and a business part. Central importance has the modeling of competition in the liberalized market. A model of competition between enterprises in the electricity market is developed. (author)

  4. Goals, tasks and aspects of activity of Ukrainian State Scientific and Technical Center on Nuclear and Radiation Safety

    International Nuclear Information System (INIS)

    Kovbasenko, Yu.

    2001-01-01

    The goal of SSTC NRS activities is scientific, technical, analytical and expert support to the Nuclear Regulatory Department as a State Nuclear and Radiation Safety Regulatory Authority.The main tasks are: 1. Development and improvement of normative and legal framework in the field of nuclear power use in Ukraine; 2. Expert support in making regulatory decisions; 3. Research and development work on improvement engineering and operational safety of nuclear power facilities in Ukraine. The organizational structure of SSTC NRS is also given

  5. Factor analysis for imperfect maintenance planning at nuclear power plants by cognitive task analysis

    International Nuclear Information System (INIS)

    Takagawa, Kenichi; Iida, Hiroyasu

    2011-01-01

    Imperfect maintenance planning was frequently identified in domestic nuclear power plants. To prevent such an event, we analyzed causal factors in maintenance planning stages and showed the directionality of countermeasures in this study. There is a pragmatic limit in finding the causal factors from the items based on report descriptions. Therefore, the idea of the systemic accident model, which is used to monitor the performance variability in normal circumstances, is taken as a new concept instead of investigating negative factors. As an actual method for analyzing usual activities, cognitive task analysis (CTA) was applied. Persons who experienced various maintenance activities at one electric power company were interviewed about sources related to decision making during maintenance planning, and then usual factors affecting planning were extracted as performance variability factors. The tendency of domestic events was analyzed using the classification item of those factors, and the directionality of countermeasures was shown. The following are critical for preventing imperfect maintenance planning: the persons in charge should fully understand the situation of the equipment for which they are responsible in the work planning and maintenance evaluation stages, and they should definitely understand, for example, the maintenance bases of that equipment. (author)

  6. Methodological approach to participatory formulation of agricultural technical assistance plans with territorial approach

    Directory of Open Access Journals (Sweden)

    Holmes Rodríguez Espinosa

    2015-10-01

    Full Text Available The collective identification of needs and shared decision-making in projects’ formulation for agricultural development is a process that requires the identification of participatory methodologies to promote active and reflective engagement of producers. The aim of this study was to evaluate a methodological approach for participatory formulation of technical assistance plan with territorial approach. Matrix analysis for the identification and prioritization of the most limiting technical assistance factors for milk production was performed and alternative solutions were defined, through participatory workshops with farmers. The results show the advantages of a collective reflection with stakeholders and quantitative tools reducing subjectivity in decision-making, improving participation in their own development and identifying acceptable alternatives to farmers and viable to the municipality in order to improve lack of pasture and forage management, implementation of good agricultural practices GAP and rational use of agrochemicals.

  7. Study of the method of placing technical stations

    Directory of Open Access Journals (Sweden)

    Sattorov S.B.

    2017-12-01

    Full Text Available At present, the organization of transportation by rail is associated with the processing of trains and wagons along the route. Accommodation and equipping of technical stations play a major role in the organization of the transportation process. The uninterrupted operation of the technical stations ensures the stability of the railway transport as a whole. The distance between the technical stations determines the duration of operation of the locomotive crew, the efficient use of the locomotive, the required number of locomotive crews and locomotives for carrying out the transportation plan, and also improves the main indicators of the railway. However, often train locomotives do not fulfill their assigned tasks due to the lack of time for the locomotive crew in order to deliver the train to the nearest technical station, as well as the irrational use of the standard time of the locomotive crew. In connection with the expectation of delivery, the locomotive brigade replacing the locomotive, the idle time of the wagons at the intermediate stations increases. All this makes it difficult to control the movement of trains and reduces the speed of moving cars on the railway transport. The purpose of the study is to develop a method for placing technical stations on a railway test site in the course of an electric traction. To achieve this goal, it will be necessary to solve the following tasks: generalization of the main parameters of the location of technical stations; determination of half-races between technical stations in the operation of one locomotive brigade; search for the required number of change of the locomotive brigade; determination of the distance between technical stations. The methods of research are based on the generalization and analysis of existing results in finding the rational location of technical stations. Results: It is revealed that the first step for the rational placement of technical stations is to determine the

  8. Noise disturbance in open-plan study environments : a field study on noise sources, student tasks and room acoustic parameters

    NARCIS (Netherlands)

    Braat-Eggen, P.E.; van Heijst, A.W.M.; Hornikx, M.C.J.; Kohlrausch, A.G.

    2017-01-01

    The aim of this study is to gain more insight in the assessment of noise in open-plan study environments and to reveal correlations between noise disturbance experienced by students and the noise sources they perceive, the tasks they perform and the acoustic parameters of the open-plan study

  9. Task Assignment and Path Planning for Multiple Autonomous Underwater Vehicles Using 3D Dubins Curves †.

    Science.gov (United States)

    Cai, Wenyu; Zhang, Meiyan; Zheng, Yahong Rosa

    2017-07-11

    This paper investigates the task assignment and path planning problem for multiple AUVs in three dimensional (3D) underwater wireless sensor networks where nonholonomic motion constraints of underwater AUVs in 3D space are considered. The multi-target task assignment and path planning problem is modeled by the Multiple Traveling Sales Person (MTSP) problem and the Genetic Algorithm (GA) is used to solve the MTSP problem with Euclidean distance as the cost function and the Tour Hop Balance (THB) or Tour Length Balance (TLB) constraints as the stop criterion. The resulting tour sequences are mapped to 2D Dubins curves in the X - Y plane, and then interpolated linearly to obtain the Z coordinates. We demonstrate that the linear interpolation fails to achieve G 1 continuity in the 3D Dubins path for multiple targets. Therefore, the interpolated 3D Dubins curves are checked against the AUV dynamics constraint and the ones satisfying the constraint are accepted to finalize the 3D Dubins curve selection. Simulation results demonstrate that the integration of the 3D Dubins curve with the MTSP model is successful and effective for solving the 3D target assignment and path planning problem.

  10. Planning of activities in the Laguna Verde Central planning at 12 weeks; Planeacion de Actividades en la Central Laguna Verde planeacion a doce semanas

    Energy Technology Data Exchange (ETDEWEB)

    Chimalpopoca, C. [Comision Federal de Electricidad, Central Laguna Verde, Subgerencia General de Operacion y Planeacion, Veracruz (Mexico)]. e-mail: carlos.chimalpopoca@cfe.gob.mx

    2007-07-01

    The universe of works that are carried out in a nuclear facility to maintain effective the structures, systems and components require of a continuous analysis, in the order of the maintenance frequencies that can be of the preventive, predictive or corrective type. Each component is associated to reserve parts, readiness of systems, in fulfillment to the operation technical specifications, to the environment of the one work; each component requires of a planning level, where it is distinguished with clarity when they are executed, in the operation stage, stop or recharge. This work has as end to show like the activities are planned during the operation, using planning methods to twelve weeks, where the reach of the task is conceptualized, operative requirements, of reserve parts, of the work environment analysis, of those radiological conditions, of the authorizations for their execution, the same execution and the evaluation post work like a technique to maintain in continuous improvement the tasks of the maintenance of the Units of the Power station. A motor valve to be worked in its internals requires access to the work point, it requires bill of the system, electric disconnection, maneuvers to disassemble actuators and retirement of thermal isolation if it applies, reserve parts of the caps joints, control mechanisms, personal, tools, radiological control. The success of the continuous operation of a power station is in the planning quality, the attention of each one of the details to assure that the components, structures and components stay effective to make their function when they are demanded. The planning task requires of experience and knowledge of each some of the components, the task of planning of activities and its execution is multidisciplinary This work has that purpose, to show the planning tools in the Laguna Verde Nuclear Power station, under the concept of twelve weeks. (Author)

  11. Savannah River Site sample and analysis plan for Clemson Technical Center waste

    International Nuclear Information System (INIS)

    Hagstrom, T.

    1998-04-01

    The purpose of this sampling and analysis plan is to determine the chemical, physical and radiological properties of the SRS radioactive Polychlorinated Biphenyl (PCB) liquid waste stream, to verify that it conforms to Waste Acceptance Criteria of the Department of Energy (DOE) East Tennessee Technology Park (ETTP) Toxic Substance Control Act (TSCA) Incineration Facility. Waste being sent to the ETTP TSCA Incinerator for treatment must be sufficiently characterized to ensure that the waste stream meets the waste acceptance criteria to ensure proper handling, classification, and processing of incoming waste to meet the Waste Storage and Treatment Facility's Operating Permits. This sampling and analysis plan is limited to WSRC container(s) of homogeneous or multiphasic radioactive PCB contaminated liquids generated in association with a treatability study at Clemson Technical Center (CTC) and currently stored at the WSRC Solid Waste Division Mixed Waste Storage Facility (MWSF)

  12. Technical innovation and management

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Yang Cheol

    1982-08-15

    This book gives explanations of the conception of technical innovation, development plan in Korea, connection between technology and a growth factor in national income, problem of technical innovation in developing country, analysis on cooperation between a developed country and a developing country, evaluation and strategy of technical development in Korea, technical innovation of industry, management of technical industry, analysis of special condition in Korea.

  13. Technical innovation and management

    International Nuclear Information System (INIS)

    Yoon, Yang Cheol

    1982-08-01

    This book gives explanations of the conception of technical innovation, development plan in Korea, connection between technology and a growth factor in national income, problem of technical innovation in developing country, analysis on cooperation between a developed country and a developing country, evaluation and strategy of technical development in Korea, technical innovation of industry, management of technical industry, analysis of special condition in Korea.

  14. Technical support of standards for high-level radioactive waste management. Volume B. Engineering controls. Task b report Mar-Aug 77

    International Nuclear Information System (INIS)

    1979-01-01

    This report is the result of work performed under the second part (Task B) of a four-part contract to gather technical information to evaluate enviornmental acceptablity of various options for disposing high-level wastes. The other tasks are: A-Source Term Characterization; C-Assessment of Migration Pathways; D-Assessment of Accidental Pathways. The scope of work for Task B was divided into 2 major steps: analysis of technology for engineering control of high-level wastes, and projections of costs for various alternative disposal technologies. Primary emphasis has been placed in non-reprocessed spent fuel. Brief consideration has been given to lower-level transuranic contaminated wastes which arise primarily from plutonium fuel fabrication and reprocessing plants. The objective of this limited review is to provide some insight into the state of the art for applying engineering controls to such wastes, including, where necessary, direct burial with high-level wastes in a geologic disposal facility

  15. Management of technical information department

    International Nuclear Information System (INIS)

    Kim, T. H.; Han, D. H.; Moon, H. W.

    1997-03-01

    This report introduces technical information activities in 1996. They are composed of basic tasks and applied tasks. 1. Basic activities - acquisition, cataloging, and Information services 2. Management of KAERI-TIPS (Technical Information Processing System) 3. Construction of the database for nuclear-related Information 4. Role of Specialized Nuclear Information Center in the field of nuclear energy and cooperation with INIS section of IAEA 5. Beside above activities, in 1996 TID homepage was opened and online document delivery service was provided. (author). 25 tabs., 17 figs

  16. Management of technical information department

    Energy Technology Data Exchange (ETDEWEB)

    Kim, T H; Han, D H; Moon, H W [and others

    1997-03-01

    This report introduces technical information activities in 1996. They are composed of basic tasks and applied tasks. 1. Basic activities - acquisition, cataloging, and Information services 2. Management of KAERI-TIPS (Technical Information Processing System) 3. Construction of the database for nuclear-related Information 4. Role of Specialized Nuclear Information Center in the field of nuclear energy and cooperation with INIS section of IAEA 5. Beside above activities, in 1996 TID homepage was opened and online document delivery service was provided. (author). 25 tabs., 17 figs.

  17. Report on the IAEA technical meeting on application libraries for ADS and transmutation

    International Nuclear Information System (INIS)

    Stanculescu, S.; Trkov, A.

    2004-12-01

    Highlights of the technical meeting are given with respect to the source of evaluated nuclear data, codes for ADS analysis with associated application libraries, content of these libraries, and the procedure for producing them. Participants debated their requirements and formulated an action plan, with work divided between four sub-groups: review/analysis of ADS benchmarks; selection of evaluated nuclear data files; preparation of the cross-section libraries; and benchmarking. Specific tasks were assigned with deadlines. (author)

  18. Nuclear criticality project plan for the Hanford Site tank farms

    Energy Technology Data Exchange (ETDEWEB)

    Bratzel, D.R., Westinghouse Hanford

    1996-08-06

    characterization with respect to fissile material. The review indicated that the conclusion in the FSARS, that a criticality is not credible, cannot be supported for a full range of potential tank constituents. Therefore, a USQ was declared. Development of a credible scenario leading to a criticality proved to be extremely difficult, given the paucity of data on the quantity and distribution of fissile material in the tanks. The objective of this project plan is to develop a strategy and technical approach to provide a CTBSD for the FSAR and for resolution of the nuclear criticality safety issue pertaining to tank farm waste storage and transfer operations. The strategy and technical approach identified in this project plan include definition of administrative and technical tasks. Technical analyses will include mechanistic studies, historical data review, and additional limited neutronics analysis. Completion of these studies will be documented in a CTBSD to support the existing criticality technical basis. The CTBSD will be incorporated in the criticality portion of the FSAR.

  19. IEA Wind Task 23, offshore wind technology and deployment. Subtask 1: Experience with critical deployment issues. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    Lemming, J

    2010-10-15

    The final report for IEA Wind Task 23, Offshore Wind Energy Technology and Deployment, is made up of two separate reports: Subtask 1: Experience with Critical Deployment Issues and Subtask 2: Offshore Code Comparison Collaborative (OC3). The Subtask 1 report included here provides background information and objectives of Task 23. It specifically discusses ecological issues and regulation, electrical system integration and offshore wind, external conditions, and key conclusions for Subtask 1. A comprehensive approach to planning is needed that integrates impacts on ecology, the effects of electrical infrastructure, and the layout of wind farms. Governments, which usually finance ecological research, should disclose results for wide dissemination as they become available. As example the workshop held suggested that documents covering the issues like offshore wind energy legislation, Guidelines for EIAs and SEAs and best practices need to be produced and distributed on a regular basis, as ecological research progresses and experience from the planning and operation of existing wind farms emerges. Research should help strike the balance between optimum regulation and the need to get projects up and running. Such research is needed to increase understanding of offshore wind metrology and its impact on electrical power fluctuations. More work is needed to develop special grid code and standards for offshore. The transient behavior of large cable installations (switching / harmonic/ Behavior and modeling of large HV cable systems) must be better understood. Connection and control systems must be developed for large offshore wind farms. Work is needed to develop the technical architecture of offshore wind grid systems. Public access to measurements (e.g., turbine power output, meteorological masts, buoys) is important, especially for model validation. Determining wake effects is currently the most important challenge in wind engineering. Emphasis should be put into

  20. U.S. Nuclear Regulatory Commission human factors program plan

    International Nuclear Information System (INIS)

    1986-04-01

    The purpose of the U.S. Nuclear Regulatory Commission (NRC) Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design and operation of nuclear facilities. This revised plan addresses human factors issues related to the operation of nuclear power plants (NPPs). The three issues of concern are (1) the activities planned to provide the technical bases to resolve the remaining tasks related to human factors as described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements; (2) the need to address the additional human factors efforts that were identified during implementation of the Action Plan; and (3) the actual fulfillment of those developmental activities specified in Revision 1 of this plan. The plan represents a systematic approach for addressing high priority human factors concerns important to NPP safety in FY 1986 through 1987

  1. Gap Task Force

    CERN Multimedia

    Lissuaer, D

    One of the more congested areas in the ATLAS detector is the GAP region (the area between the Barrel Calorimeter and the End Cap calorimeter) where Inner Detector services, LAr Services and some Tile services all must co-habitat in a very limited area. It has been clear for some time that the space in the GAP region is not sufficient to accommodate all that is needed. In the last few month additional problems of routing all the services to Z=0 have been encountered due to the very limited space between the Tile Calorimeter and the first layer of Muon chambers. The Technical Management Board (TMB) and the Executive Board (EB) decided in the middle of March to establish a Task Force to look at this problem and come up with a solution within well-specified guidelines. The task force consisted of experts from the ID, Muon, Liquid Argon and Tile systems in addition to experts from the Technical Coordination team and the Physics coordinator. The task force held many meetings and in general there were some very l...

  2. Technical progress, the concept of individualized cancer treatment and the innovation of computer-assisted radiotherapy planning

    International Nuclear Information System (INIS)

    Merkle, K.; Tanneberger, S.; Matschke, S.

    1985-01-01

    After a first step of cancerogenesis, the further development of the tumor is an individual process. At the end of this process the tumor is formed as an individual in the individual. The individuality of cancer exists on the level of organs, tissues and cells and includes an individual tumor-host relationship. Today, optimized cancer treatment requires a most precise biological characterization possible of the tumor and of the tumor-host relationship, which will provide objective information about the individual character of every tumor. Routine analysis and strict therapeutic consideration of the clinical and biological individuality of human cancer can offer real chances for the improvement of cancer treatment. A routine acquisition of individual tumor characteristics will be possible only if methods and equipment are available for the registration of suitable parameters. In this context technical innovations have an essential influence on the realization of the concept of individualized cancer treatment. With the method of flow cytophotometry and other techniques examples are given in how far the ideas of individual cancer management can be realized by introduction of new technical solutions into medical research and clinical practice. Unfortunately there is still a lack of methodology in individualizing cancer treatment. The individualization of radiotherapy is connected to an extremely high degree of technical innovations. Particularly this refers to the topometrical description of the target volume in relation to the adjacent anatomical structures and the body contour as well as the fitting of isodoses to the shape and size of the target volume. As an example of innovation of a technical solution for individual radiotherapy planning the computer-assisted radiotherapy planning system DOPSY is described. (author)

  3. TRANSLATING SERVICE TECHNICAL PROSE

    African Journals Online (AJOL)

    language. The Application of Technical Service. Prose. To form a good idea of the appl ication .... cost lives. In this particular domain, translators must have a sound technical ... These semantic ... another language and often, in doing so, changing its meaning. The words ..... He will hand out tasks to each translator and after.

  4. Technical tasks in superconducting cavities

    Energy Technology Data Exchange (ETDEWEB)

    Saito, Kenji [High Energy Accelerator Research Organization, Tsukuba, Ibaraki (Japan)

    1997-11-01

    The feature of superconducting rf cavities is an extremely small surface resistance on the wall. It brings a large energy saving in the operation, even those are cooled with liquid helium. That also makes possible to operate themselves in a higher field gradient comparing to normal conducting cavities, and brings to make accelerators compact. These merits are very important for the future accelerator engineering which is planed at JAERI for the neutron material science and nuclear waste transmutation. This machine is a high intensity proton linac and uses sc cavities in the medium and high {beta} sections. In this paper, starting R and D of proton superconducting cavities, several important technical points which come from the small surface resistance of sc cavities, are present to succeed it and also differences between the medium and high - {beta} structures are discussed. (author)

  5. Technical findings related to Generic Issue 23: Reactor coolant pump seal failure

    International Nuclear Information System (INIS)

    Ruger, C.J.; Luckas, W.J. Jr.

    1989-03-01

    Reactor coolant pumps contain mechanical seals to limit the leakage of pressurized coolant from the reactor coolant system to the containment. These seals have the potential to leak, and a few have degraded and even failed resulting in a small break loss of coolant accident (LOCA). As a result, ''Reactor Coolant Pump Seal Failure,'' Generic Issue 23 was established. This report summarizes the findings of a technical investigation generated as part of the program to resolve this issue. These technical findings address the various fact-finding issue tasks developed for the action plan associated with the generic issue, namely background information on seal failure, evaluation of seal cooling, and mechanical- and maintenance-induced failure mechanisms. 46 refs., 15 figs., 14 tabs

  6. Technical Progress Report on Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration

    Energy Technology Data Exchange (ETDEWEB)

    Bill Stanley; Patrick Gonzalez; Sandra Brown; Jenny Henman; Ben Poulter; Sarah Woodhouse Murdock; Neil Sampson; Tim Pearson; Sarah Walker; Zoe Kant; Miguel Calmon; Gilberto Tiepolo

    2006-06-30

    The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects, providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas reductions. The research described in this report occurred between April 1st and July 30th 2006. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: emerging technologies for remote sensing of terrestrial carbon; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool. Work is being carried out in Brazil, Belize, Chile, Peru and the USA.

  7. Life sciences payload definition and integration study, task C and D. Volume 2: Payload definition, integration, and planning studies

    Science.gov (United States)

    1973-01-01

    The Life Sciences Payload Definition and Integration Study was composed of four major tasks. Tasks A and B, the laboratory definition phase, were the subject of prior NASA study. The laboratory definition phase included the establishment of research functions, equipment definitions, and conceptual baseline laboratory designs. These baseline laboratories were designated as Maxi-Nom, Mini-30, and Mini-7. The outputs of Tasks A and B were used by the NASA Life Sciences Payload Integration Team to establish guidelines for Tasks C and D, the laboratory integration phase of the study. A brief review of Tasks A and B is presented provide background continuity. The tasks C and D effort is the subject of this report. The Task C effort stressed the integration of the NASA selected laboratory designs with the shuttle sortie module. The Task D effort updated and developed costs that could be used by NASA for preliminary program planning.

  8. Training of technical staff and technical staff managers

    International Nuclear Information System (INIS)

    Moody, G.F.

    1991-01-01

    The purpose of Technical Staff and Technical Staff Managers training is to provide job skills enhancement to individuals selected to fill key technical positions within a nuclear utility. This training is unique in that unlike other training programs accredited by the National Academy for Nuclear Training, it does not lead to specific task qualification. The problems encountered when determining the student population and curriculum are a direct result of this major difference. Major problems encountered are determining who should attend the training, what amount of training is necessary and sufficient, and how to obtain the best feedback in order to effect substantive program improvements. These topics will be explored and possible solutions discussed

  9. Task Assignment and Path Planning for Multiple Autonomous Underwater Vehicles Using 3D Dubins Curves †

    Directory of Open Access Journals (Sweden)

    Wenyu Cai

    2017-07-01

    Full Text Available This paper investigates the task assignment and path planning problem for multiple AUVs in three dimensional (3D underwater wireless sensor networks where nonholonomic motion constraints of underwater AUVs in 3D space are considered. The multi-target task assignment and path planning problem is modeled by the Multiple Traveling Sales Person (MTSP problem and the Genetic Algorithm (GA is used to solve the MTSP problem with Euclidean distance as the cost function and the Tour Hop Balance (THB or Tour Length Balance (TLB constraints as the stop criterion. The resulting tour sequences are mapped to 2D Dubins curves in the X − Y plane, and then interpolated linearly to obtain the Z coordinates. We demonstrate that the linear interpolation fails to achieve G 1 continuity in the 3D Dubins path for multiple targets. Therefore, the interpolated 3D Dubins curves are checked against the AUV dynamics constraint and the ones satisfying the constraint are accepted to finalize the 3D Dubins curve selection. Simulation results demonstrate that the integration of the 3D Dubins curve with the MTSP model is successful and effective for solving the 3D target assignment and path planning problem.

  10. Engineering Task Plan for the Integrity Assessment Examination of Double-Contained Receiver Tanks (DCRT), Catch Tanks and Ancillary facilities

    International Nuclear Information System (INIS)

    BECKER, D.L.

    2000-01-01

    This Engineering Task Plan (ETP) presents the integrity assessment examination of three DCRTs, seven catch tanks, and two ancillary facilities located in the 200 East and West Areas of the Hanford Site. The integrity assessment examinations, as described in this ETP, will provide the necessary information to enable the independently qualified registered professional engineer (IQRPE) to assess the condition and integrity of these facilities. The plan is consistent with the Double-Shell Tank Waste Transfer Facilities Integrity Assessment Plan

  11. New usable technical specifications

    International Nuclear Information System (INIS)

    Webster, S.A.; Tomasi, L.T.; Bernier, R.A.

    1989-01-01

    After 2 yr of preparation, 1988 finally saw the nuclear industry writing operator-oriented technical specifications. This effort is a continuation of previous efforts to develop improved and usable standard technical specifications (STSs), and is being conducted by the four nuclear steam supply system vendor owners' groups under the auspices of the Nuclear Management Resources Council. Each participant is currently preparing a set of improved STSs based on a writer's guide that was developed through a combined industry effort. In May of 1987, a Human Factors Improvements to Technical Specifications (HFITS) task group was formed to prepare a writer's guide for improved, industrywide STSs. This task group was composed of two representatives from each owners' group, one with a human factors background and one with some operations background. Two documents were prepared in 6 months, a human factors report laying the groundwork for the considerations to go into technical specifications and a writer's guide for their preparation. This paper reports on the application of this writer's guide to the writing of improved STS

  12. Record of Technical Change No.2 for ''Corrective Action Investigation Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada''

    International Nuclear Information System (INIS)

    1999-01-01

    This Record of Technical Change provides updates to the technical information included in ''Corrective Action Investigation Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada.''

  13. Istra district heating system. General technical report. Appendix 1 to the master plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    The objective of the master plan project is to improve the heat supply in Istra. The considerable system losses from the fuel supplied to the end-users are one issue for improvement. At the same time, the current system operation results in poor quality heat for the consumers. Due to the inflexibility of the system the dwellings/premises of the consumers are either overheated or insufficiently heated. The financial situation in Istra, the legal ownership of the district heating system and consumers' lacking ability to pay limit the possibilities for system improvements. The Master Plan and Feasibility Study evaluates four different development scenarios. Each of the scenarios is compared to the current situation in Istra, where nothing is done to change the system, but only to operate the present system in a sustainable way. The sustainable operation of the district heating system includes all necessary renovations and component replacements necessary. The project does not take into account the present financial situation in Istra, which has resulted in less maintenance than necessary. This situation is not a comparable parameter, as it is not sustainable and will lead to a breakdown of the heat supply within a short time horizon. The General Technical Report evaluates the technical situation and describes system improvements at a general level. The intention with this report is to provide important information useful to other district heating companies in Russia. (au)

  14. Developing non-technical ward-round skills.

    Science.gov (United States)

    Harvey, Rachel; Mellanby, Edward; Dearden, Effie; Medjoub, Karima; Edgar, Simon

    2015-10-01

    Conducting clinical 'rounds' is one of the most onerous and important duties that every junior doctor is expected to perform. There is evidence that newly qualified doctors are not adequately prepared by their undergraduate experiences for this task. The aim of this study was to analyse the challenges pertaining to non-technical skills that students would face during ward rounds, and to create a model that facilitates the transition from medical student to doctor. A total of 217 final-year medical students completed a simulated ward round. Free-text responses were analysed using template analysis applying an a priori template developed from the literature by the research team. This drew on the generic categories of non-technical skills suggested by Flin et al. Ninety-seven per cent of students agreed or strongly agreed that the simulated ward round improved their insight into the challenges of ward rounds and their perceived ability to work efficiently as an active member of the ward round. The responding students (206) submitted written feedback describing the learning that they planned to use: 800 learning points were recorded, and all could be categorised into one of seven non-technical skills. Conducting clinical 'rounds' is one of the most onerous and important duties that every junior doctor is expected to perform We believe that improved task efficiency and insight into the challenges of the ward round gained by medical students will lead to an enhancement in performance during clinical rounds, and will have a positive impact on patient safety. We would suggest that undergraduate medical schools consider this model in the preparation for the clinical practice element of the curriculum. © 2015 John Wiley & Sons Ltd.

  15. Task-space separation principle: a force-field approach to motion planning for redundant manipulators.

    Science.gov (United States)

    Tommasino, Paolo; Campolo, Domenico

    2017-02-03

    In this work, we address human-like motor planning in redundant manipulators. Specifically, we want to capture postural synergies such as Donders' law, experimentally observed in humans during kinematically redundant tasks, and infer a minimal set of parameters to implement similar postural synergies in a kinematic model. For the model itself, although the focus of this paper is to solve redundancy by implementing postural strategies derived from experimental data, we also want to ensure that such postural control strategies do not interfere with other possible forms of motion control (in the task-space), i.e. solving the posture/movement problem. The redundancy problem is framed as a constrained optimization problem, traditionally solved via the method of Lagrange multipliers. The posture/movement problem can be tackled via the separation principle which, derived from experimental evidence, posits that the brain processes static torques (i.e. posture-dependent, such as gravitational torques) separately from dynamic torques (i.e. velocity-dependent). The separation principle has traditionally been applied at a joint torque level. Our main contribution is to apply the separation principle to Lagrange multipliers, which act as task-space force fields, leading to a task-space separation principle. In this way, we can separate postural control (implementing Donders' law) from various types of tasks-space movement planners. As an example, the proposed framework is applied to the (redundant) task of pointing with the human wrist. Nonlinear inverse optimization (NIO) is used to fit the model parameters and to capture motor strategies displayed by six human subjects during pointing tasks. The novelty of our NIO approach is that (i) the fitted motor strategy, rather than raw data, is used to filter and down-sample human behaviours; (ii) our framework is used to efficiently simulate model behaviour iteratively, until it converges towards the experimental human strategies.

  16. Turnaround operations analysis for OTV. Volume 2: Detailed technical report

    Science.gov (United States)

    1988-01-01

    The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.

  17. Technical Training: Technical Training Seminar

    CERN Multimedia

    2004-01-01

    TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch Monday 9 February 2004 From 10:00 to 12:00 - IT Auditorium - bldg. 31, 3rd floor ANSOFT High-Frequency Seminar David Prestaux, Application Engineer, ANSOFT F-78535 BUC, France This Technical Training seminar will present two Ansoft application products: Ansoft HFSS and Ansoft Designer. Ansoft HFSS makes use of the Finite Element Method (FEM) to calculate field solutions from first principles. It can accurately predict all high-frequency behaviours such as dispersion, mode conversion, and losses due to materials and radiation. Ansoft Designer is a suite of design tools to fully integrate high-frequency, physics-based electromagnetic simulations into a seamless system-level simulation environment. Ansoft Designer uses a simple interface to give complete control over every design task, by a method allowing multiple solvers, Solver on Demand. • Introduction • Overview of the Ansoft Total solution • Ansoft HFSS 9...

  18. Does service integration improve technical quality of care in low-resource settings? An evaluation of a model integrating HIV care into family planning services in Kenya.

    Science.gov (United States)

    Mutemwa, Richard; Mayhew, Susannah H; Warren, Charlotte E; Abuya, Timothy; Ndwiga, Charity; Kivunaga, Jackline

    2017-11-01

    The aim of this study was to investigate association between HIV and family planning integration and technical quality of care. The study focused on technical quality of client-provider consultation sessions. The cross-sectional study observed 366 client-provider consultation sessions and interviewed 37 health care providers in 12 public health facilities in Kenya. Multilevel random intercept and linear regression models were fitted to the matched data to investigate relationships between service integration and technical quality of care as well as associations between facility-level structural and provider factors and technical quality of care. A sensitivity analysis was performed to test for hidden bias. After adjusting for facility-level structural factors, HIV/family planning integration was found to have significant positive effect on technical quality of the consultation session, with average treatment effect 0.44 (95% CI: 0.63-0.82). Three of the 12 structural factors were significantly positively associated with technical quality of consultation session including: availability of family planning commodities (9.64; 95% CI: 5.07-14.21), adequate infrastructure (5.29; 95% CI: 2.89-7.69) and reagents (1.48; 95% CI: 1.02-1.93). Three of the nine provider factors were significantly positively associated with technical quality of consultation session: appropriate provider clinical knowledge (3.14; 95% CI: 1.92-4.36), job satisfaction (2.02; 95% CI: 1.21-2.83) and supervision (1.01; 95% CI: 0.35-1.68), while workload (-0.88; 95% CI: -1.75 to - 0.01) was negatively associated. Technical quality of the client-provider consultation session was also determined by duration of the consultation and type of clinic visit and appeared to depend on whether the clinic visit occurred early or later in the week. Integration of HIV care into family planning services can improve the technical quality of client-provider consultation sessions as measured by both health facility

  19. Technical issues related to NUREG 0800, Chapter 18: Human Factors Engineering/Standard Review Plan

    International Nuclear Information System (INIS)

    Savage, J.W.

    1982-01-01

    The revision of Chapter 18 of NUREG 0800, Human Factors Engineering Standard Review Plan (SRP) will be based on SECY 82-111 and guidance contained in NUREG 0700, NUREG 0801 and NUREG 0835, plus other references. In conducting field reviews of control rooms, the NRC has identified technical issues which can be used to enhance the development of the revised version of NUREG 0800, and to establish priorities among the list of possible Branch Technical Positions (BTP) in NUREG 0800, Rev. 0, Table 18.0-2. This report is a compilation of comments and suggestions from the people who used NUREG 0700 in the Control Room field reviews. This information was used to establish possible BTP topic priorities so that the most important BTPs could be issued first. The comments and suggestions are included for HFEB review in conjunction with the table of priorities

  20. Effort - Final technical report on task 3

    DEFF Research Database (Denmark)

    Bay, Niels; Henningsen, Poul; Eriksen, Morten

    The present report is documentation for the work carried out at DTU on the Brite/Euram project No. BE96-3340, contract No. BRPR-CT97-0398, with the title Enhanced Framework for forging design using reliable three-dimensional simulation (EFFORTS). The objective of task 3 is to determine data...

  1. Fuel cell power systems for remote applications. Phase 1 final report and business plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The goal of the Fuel Cell Power Systems for Remote Applications project is to commercialize a 0.1--5 kW integrated fuel cell power system (FCPS). The project targets high value niche markets, including natural gas and oil pipelines, off-grid homes, yachts, telecommunication stations and recreational vehicles. Phase 1 includes the market research, technical and financial analysis of the fuel cell power system, technical and financial requirements to establish manufacturing capability, the business plan, and teaming arrangements. Phase 1 also includes project planning, scope of work, and budgets for Phases 2--4. The project is a cooperative effort of Teledyne Brown Engineering--Energy Systems, Schatz Energy Research Center, Hydrogen Burner Technology, and the City of Palm Desert. Phases 2 through 4 are designed to utilize the results of Phase 1, to further the commercial potential of the fuel cell power system. Phase 2 focuses on research and development of the reformer and fuel cell and is divided into three related, but potentially separate tasks. Budgets and timelines for Phase 2 can be found in section 4 of this report. Phase 2 includes: Task A--Develop a reformate tolerant fuel cell stack and 5 kW reformer; Task B--Assemble and deliver a fuel cell that operates on pure hydrogen to the University of Alaska or another site in Alaska; Task C--Provide support and training to the University of Alaska in the setting up and operating a fuel cell test lab. The Phase 1 research examined the market for power systems for off-grid homes, yachts, telecommunication stations and recreational vehicles. Also included in this report are summaries of the previously conducted market reports that examined power needs for remote locations along natural gas and oil pipelines. A list of highlights from the research can be found in the executive summary of the business plan.

  2. Next Generation Nuclear Plant Methods Technical Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2010-12-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  3. Responding to the World Health Organization Global Disability Action Plan in Egypt: A Technical Consultancy to develop a National Disability, Health and Rehabilitation Plan.

    Science.gov (United States)

    Gutenbrunner, Christoph; Nugraha, Boya

    2018-04-18

    A technical consultation to develop a National Disability, Health and Rehabilitation Plan (NDHRP) for Egypt was carried out in 2015. Its overall goal was to improve health, functioning, well-being, quality of life, and participation of persons with disability in Egypt by supporting the Ministry of Health and Population and other stakeholders to improve access to health services and strengthen health-related rehabilitation services for all persons in need. The methodological steps of the technical consultation were as follows: collecting and reviewing accessible documents and data; site visits to state institutions, health and rehabilitation services; discussions with relevant stakeholders in rehabilitation, including persons with disability; drafting recommendations based on the principles of the World Report on Disability and the World Health Organization Global Disability Action Plan and the information collected; discussion with stakeholders in a workshop; and preparation of a final report. The development of a NDHRP was successful and led to recommendations with a good level of consensus among stakeholders in Egypt. The authors hope that the NDHRP will lead to improved rehabilitation service provision, and health and quality of life of persons with disability and chronic health conditions living in Egypt.

  4. South Africa's rapid electrification programme: Policy, institutional, planning, financing and technical innovations

    International Nuclear Information System (INIS)

    Bekker, Bernard; Eberhard, Anton; Gaunt, Trevor; Marquard, Andrew

    2008-01-01

    This paper documents South Africa's electrification programme from the late 1980s to the present. The primary aim of the paper is to present the reader with an overview of the policy, institutional, planning, financing and technological developments and innovations that resulted in more than 5 million households receiving access to electricity between 1990 and 2007. Key aspects include the way in which a period of political change and policy disruption were essential to the programme's initiation, and the critical role played by organisations and individuals outside of national government in helping shape new electrification policies and strategies. In addition, the paper identifies the contribution of technology development in cost reduction and achieving the social aims of the programme. Several lessons may be drawn from the institutional and planning arrangements that the South African programme has developed, the significance of the development of appropriate cost-driven technical innovations and standards, and the acknowledgement of the social function of electrification and its funding from the fiscus (rather than through cross-subsidies)

  5. Project Management Plan for the INEL technology logic diagrams

    International Nuclear Information System (INIS)

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ''Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG ampersand G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project

  6. Regulatory Assistance, Stakeholder Outreach, and Coastal and Marine Spatial Planning Activities In Support Marine and Hydrokinetic Energy Deployment: Task 2.1.7 Permitting and Planning Fiscal Year 2012 Year-End Report

    Energy Technology Data Exchange (ETDEWEB)

    Geerlofs, Simon H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hanna, Luke A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Judd, Chaeli R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Blake, Kara M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2012-09-01

    This fiscal year 2012 year-end report summarizes activities carried out under DOE Water Power task 2.1.7, Permitting and Planning. Activities under Task 2.1.7 address the concerns of a wide range of stakeholders with an interest in the development of the MHK industry, including regulatory and resource management agencies, tribes, NGOs, and industry.

  7. Urban energy management today: Ten year compendium of UCETF programs. Products and expertise of the Urban Consortium Energy Task Force, 1979--1989

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    The reports listed in this Overview summarize projects conducted through the Urban Consortium Energy Task Force by local government staff who have defined and implemented many of the energy strategies described above. Reports from their projects illustrate effective approaches to plan and implement these strategies, as well as software tools, surveys, and technical instruments valuable to other local government officials conducting similar projects.

  8. Technical and economic evaluation of voltage level in transmission network expansion planning using GA

    International Nuclear Information System (INIS)

    Jalilzadeh, S.; Kazemi, A.; Shayeghi, H.; Madavi, M.

    2008-01-01

    Transmission network expansion planning is an important part of power system planning. Its task is to determine an optimal network configuration according to load growth. It determines where, when and how many new transmission lines should be installed. Up to now, various methods have been presented to solve the static transmission network expansion planning (STNEP) problem, but in all of these methods, the STNEP problem has been solved regardless of voltage level of the lines. In this paper, due to different voltage levels in the transmission network, which cause different annual losses, STNEP has been studied considering the voltage level of the transmission lines and the network loss using the genetic algorithm (GA). Finally, the proposed idea has been examined on Garvers 6 bus network. The results show that considering the loss in a network with different voltage levels decreases the operational costs considerably, and the network satisfies the requirement of delivering electric power more safely and reliably to load centers

  9. Oncentra brachytherapy planning system.

    Science.gov (United States)

    Yang, Jack

    2018-03-27

    In modern cancer management, treatment planning has progressed as a contemporary tool with all the advances in computing power in recent years. One of the advanced planning tools uses 3-dimensional (3D) data sets for accurate dose distributions in patient prescription. Among these planning processes, brachytherapy has been a very important part of a successful cancer management program, offering clinical benefits with specific or combined treatments with external beam therapy. In this chapter, we mainly discussed the Elekta Oncentra planning system, which is the main treatment planning tool for high-dose rate (HDR) modality in our facility and in many other facilities in the United States. HDR is a technically advanced form of brachytherapy; a high-intensity radiation source (3.6 mm in length) is delivered with step motor in submillimeter precision under computer guidance directly into the tumor areas while minimizing injury to surrounding normal healthy tissue. Oncentra planning is the key component to generate a deliverable brachytherapy procedure, which is executed on the microSelectron V3 remote afterloader treatment system. Creating a highly conformal plan can be a time-consuming task. The development of Oncentra software (version 4.5.3) offers a variety of useful tools that facilitate many of the clinical challenging tasks for planning, such as contouring and image reconstruction, as well as rapid planning calculations with dose and dose volume histogram analysis. Oncentra Brachy module creates workflow and optimizes the planning accuracy for wide varieties of clinical HDR treatments, such as skin, gynecologic (GYN), breast, prostate, and many other applications. The treatment file can also be transferred to the afterloader control station for speedy delivery. The design concept, calculation algorithms, and optimization modules presented some key characteristics to plan and treat the patients effectively and accurately. The dose distribution and accuracy of

  10. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    International Nuclear Information System (INIS)

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development

  11. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development.

  12. State planning for winter energy emergencies: workshop materials

    Energy Technology Data Exchange (ETDEWEB)

    1978-04-01

    Workshops were conducted in 5 cities to improve communications between the states and the Federal government so that both might be better prepared to avoid or mitigate the impacts of energy emergencies during the winter; to provide a forum for the exchange of technical information regarding selected energy demand restraint measures which could be implemented by individual states or regions in an energy emergency; and to promote the concept of pre-crisis contingency planning and strategy development, with particuliar emphasis on the need for interstate coordination of emergency plans. The major topics addressed by the discussion guide involved net energy use impact, implementation procedures and problems, and social and economic effects. The Task Force performed extensive research into the technical considerations and prior experience in implementing each of the demand restraint measures selected for discussion. Results and conclusions are summarized for reduction of thermostat setting for space conditioning and water heating; reduction in hours of operation and lighting in commercial establishments; reduction in hours of operation in school, and industrial fuel substitution. (MCW)

  13. Technical know-how for the investigation and modelling of topographic evolution for site characterisation - 59171

    International Nuclear Information System (INIS)

    Doke, Ryosuke; Yasue, Ken-ichi; Niizato, Tadafumi; Nakayasu, Akio

    2012-01-01

    Geological hazard assessments are being used to make important decisions relevant to nuclear facilities such as a repository for deep geological disposal of high-level radioactive waste. With respect to such repositories, topographic evolution is a key issue for description of the long-term evolution of a groundwater flow characteristics in time spans of tens to hundreds of thousands of years. The construction of topographic evolution models is complex, involving tacit knowledge and working processes. Therefore, it is important to externalise, that is to explicitly present the tacit knowledge and decision-making processes used by experts in the model building unambiguously, with thorough documentation and to provide key knowledge to support planning and implementation of investigations. In this study, documentation of the technical know-how used for the construction of a topographic evolution model is demonstrated. The process followed in the construction of the model is illustrated using task-flow logic diagrams; the process involves four main tasks with several sub-tasks. The task-flow followed for an investigation to estimate uplift rates linked to the task-flow for the modelling of topographic evolution is also illustrated. In addition, the decision-making processes in the investigation are expressed in logical IF-THEN format for each task. Based on the documented technical know-how, an IT-based Expert System was constructed. In future work, it is necessary to analyse the knowledge, including the management of uncertainties in the modelling and investigations, and to integrate fundamental ideas for managing uncertainties with expert system. (authors)

  14. Inhibition in movement plan competition: reach trajectories curve away from remembered and task-irrelevant present but not from task-irrelevant past visual stimuli.

    Science.gov (United States)

    Moehler, Tobias; Fiehler, Katja

    2017-11-01

    The current study investigated the role of automatic encoding and maintenance of remembered, past, and present visual distractors for reach movement planning. The previous research on eye movements showed that saccades curve away from locations actively kept in working memory and also from task-irrelevant perceptually present visual distractors, but not from task-irrelevant past distractors. Curvature away has been associated with an inhibitory mechanism resolving the competition between multiple active movement plans. Here, we examined whether reach movements underlie a similar inhibitory mechanism and thus show systematic modulation of reach trajectories when the location of a previously presented distractor has to be (a) maintained in working memory or (b) ignored, or (c) when the distractor is perceptually present. Participants performed vertical reach movements on a computer monitor from a home to a target location. Distractors appeared laterally and near or far from the target (equidistant from central fixation). We found that reaches curved away from the distractors located close to the target when the distractor location had to be memorized and when it was perceptually present, but not when the past distractor had to be ignored. Our findings suggest that automatically encoding present distractors and actively maintaining the location of past distractors in working memory evoke a similar response competition resolved by inhibition, as has been previously shown for saccadic eye movements.

  15. TurboTech Technical Evaluation Automated System

    Science.gov (United States)

    Tiffany, Dorothy J.

    2009-01-01

    TurboTech software is a Web-based process that simplifies and semiautomates technical evaluation of NASA proposals for Contracting Officer's Technical Representatives (COTRs). At the time of this reporting, there have been no set standards or systems for training new COTRs in technical evaluations. This new process provides boilerplate text in response to interview style questions. This text is collected into a Microsoft Word document that can then be further edited to conform to specific cases. By providing technical language and a structured format, TurboTech allows the COTRs to concentrate more on the actual evaluation, and less on deciding what language would be most appropriate. Since the actual word choice is one of the more time-consuming parts of a COTRs job, this process should allow for an increase in quantity of proposals evaluated. TurboTech is applicable to composing technical evaluations of contractor proposals, task and delivery orders, change order modifications, requests for proposals, new work modifications, task assignments, as well as any changes to existing contracts.

  16. Measuring information processing in a client with extreme agitation following traumatic brain injury using the Perceive, Recall, Plan and Perform System of Task Analysis.

    Science.gov (United States)

    Nott, Melissa T; Chapparo, Christine

    2008-09-01

    Agitation following traumatic brain injury is characterised by a heightened state of activity with disorganised information processing that interferes with learning and achieving functional goals. This study aimed to identify information processing problems during task performance of a severely agitated adult using the Perceive, Recall, Plan and Perform (PRPP) System of Task Analysis. Second, this study aimed to examine the sensitivity of the PRPP System to changes in task performance over a short period of rehabilitation, and third, to evaluate the guidance provided by the PRPP in directing intervention. A case study research design was employed. The PRPP System of Task Analysis was used to assess changes in task embedded information processing capacity during occupational therapy intervention with a severely agitated adult in a rehabilitation context. Performance is assessed on three selected tasks over a one-month period. Information processing difficulties during task performance can be clearly identified when observing a severely agitated adult following a traumatic brain injury. Processing skills involving attention, sensory processing and planning were most affected at this stage of rehabilitation. These processing difficulties are linked to established descriptions of agitated behaviour. Fluctuations in performance across three tasks of differing processing complexity were evident, leading to hypothesised relationships between task complexity, environment and novelty with information processing errors. Changes in specific information processing capacity over time were evident based on repeated measures using the PRPP System of Task Analysis. This lends preliminary support for its utility as an outcome measure, and raises hypotheses about the type of therapy required to enhance information processing in people with severe agitation. The PRPP System is sensitive to information processing changes in severely agitated adults when used to reassess performance

  17. DOE organization and management approach in responding to recommendation 94-2 - The implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Widmayer, D.

    1995-12-31

    In March, the Department of Energy (DOE) submitted the Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-2, {open_quotes}Conformance with Safety Standards at Department of Energy Low-Level Nuclear Waste and Disposal Sites.{close_quotes} This paper discusses the management organization and interactions established to accomplish the tasks developed to respond to the DNFSB Recommendation. The organization of the tasks into six technical areas and the interfaces and connections between the tasks are briefly described. A summary of how each significant part of the DNFSB Recommendation is being addressed is presented. This paper provides a brief introduction to the remaining presentations in this session.

  18. Gaze training enhances laparoscopic technical skill acquisition and multi-tasking performance: a randomized, controlled study.

    Science.gov (United States)

    Wilson, Mark R; Vine, Samuel J; Bright, Elizabeth; Masters, Rich S W; Defriend, David; McGrath, John S

    2011-12-01

    The operating room environment is replete with stressors and distractions that increase the attention demands of what are already complex psychomotor procedures. Contemporary research in other fields (e.g., sport) has revealed that gaze training interventions may support the development of robust movement skills. This current study was designed to examine the utility of gaze training for technical laparoscopic skills and to test performance under multitasking conditions. Thirty medical trainees with no laparoscopic experience were divided randomly into one of three treatment groups: gaze trained (GAZE), movement trained (MOVE), and discovery learning/control (DISCOVERY). Participants were fitted with a Mobile Eye gaze registration system, which measures eye-line of gaze at 25 Hz. Training consisted of ten repetitions of the "eye-hand coordination" task from the LAP Mentor VR laparoscopic surgical simulator while receiving instruction and video feedback (specific to each treatment condition). After training, all participants completed a control test (designed to assess learning) and a multitasking transfer test, in which they completed the procedure while performing a concurrent tone counting task. Not only did the GAZE group learn more quickly than the MOVE and DISCOVERY groups (faster completion times in the control test), but the performance difference was even more pronounced when multitasking. Differences in gaze control (target locking fixations), rather than tool movement measures (tool path length), underpinned this performance advantage for GAZE training. These results suggest that although the GAZE intervention focused on training gaze behavior only, there were indirect benefits for movement behaviors and performance efficiency. Additionally, focusing on a single external target when learning, rather than on complex movement patterns, may have freed-up attentional resources that could be applied to concurrent cognitive tasks.

  19. Usage of fMRI for pre-surgical planning in brain tumor and vascular lesion patients: Task and statistical threshold effects on language lateralization

    Directory of Open Access Journals (Sweden)

    Tanvi N. Nadkarni

    2015-01-01

    Conclusion: Our results suggest that the type of task and the applied statistical threshold influence LI and that the threshold effects on LI may be task-specific. Thus identifying critical functional regions and computing LIs should be conducted on an individual subject basis, using a continuum of threshold values with different tasks to provide the most accurate information for surgical planning to minimize post-operative language deficits.

  20. Engineering task plan for five portable exhausters

    International Nuclear Information System (INIS)

    Rensink, G.E.

    1997-01-01

    Exhausters will be employed to ventilate certain single-shell tanks (SSTs) during salt well pumping campaigns. Active ventilation is necessary to reduce the potential flammable gas inventory (LANL 1996a) in the dome space that may accumulate during steady-state conditions or during/after postulated episodic gas release events. The tanks described in this plan support the activities required to fabricate and test three 500 cfm portable exhausters in the 200 W area shops, and to procure, design, fabricate and test two 1000 cfm units. Appropriate Notice of Construction (NOC) radiological and toxic air pollutant permits will be obtained for the portable exhausters. The portable exhauster design media to be employed to support this task was previously developed for the 241-A-101 exhauster. The same design as A101 will be fabricated with only minor improvements to the design based upon operator input/lessons learned. The safety authorization basis for this program effort will follow SAD 36 (LANL 1996b), and each tank will be reviewed against this SAD for changes or updates. The 1000 cfm units will be designed by the selected offsite contractor according to the specification requirements in KHC-S-O490. The offsite units have been specified to utilize as many of the same components as the 500 cfm units to ensure a more cost effective operation and maintenance through the reduction of spare parts and additional procedures

  1. Planning document for the Advanced Landfill Cover Demonstration

    International Nuclear Information System (INIS)

    Hakonson, T.E.; Bostick, K.V.

    1994-01-01

    The Department of Energy and Department of Defense are faced with the closure of thousands of decommissioned radioactive, hazardous, and mixed waste landfills as a part of ongoing Environmental Restoration activities. Regulations on the closure of hazardous and radioactive waste landfills require the construction of a ''low-permeability'' cover over the unit to limit the migration of liquids into the underlying waste. These landfills must be maintained and monitored for 30 years to ensure that hazardous materials are not migrating from the landfill. This test plan is intended as an initial road map for planning, designing, constructing, evaluating, and documenting the Advanced Landfill Cover Demonstration (ALCD). It describes the goals/ objectives, scope, tasks, responsibilities, technical approach, and deliverables for the demonstration

  2. Prioritization of tasks in the draft LWR safety technology program plan. Final report

    International Nuclear Information System (INIS)

    Lim, E.Y.; Miller, W.J.; Parkinson, W.J.; Ritzman, R.L.; vonHerrmann, J.L.; Wood, P.J.

    1980-05-01

    The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix

  3. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Golder Associates, Inc.

    2003-04-22

    result of the planning effort leading to this Master Plan, a Technical Working Group (TWG) was established that represents most, if not all, fish and wildlife agencies/interests in the subbasin. This TWG met regularly throughout the planning process to provide input and review and was instrumental in the development of this plan. Preparation of this plan included the development of a quantitative prioritization process to rank 40,000 parcels within the Urban Growth Area based on the value of fish and wildlife habitat each parcel provided. Biological and physical criteria were developed and applied to all parcels through a GIS-based prioritization model. In the second-phase of the prioritization process, the TWG provided local expert knowledge and review of the properties. In selecting the most critical areas within the Urban Growth Area for protection, this project assessed the value of fish and wildlife habitat on the Yakima River. Well-developed habitat acquisition efforts (e.g., Yakima River Basin Water Enhancement Project by the Bureau of Reclamation and Yakama Nation acquisition projects) are already underway on the Yakima River mainstem. These efforts, however, face several limitations in protection of floodplain function that could be addressed through the support of the Yakima Habitat Improvement Project. This Master Plan integrates tributary habitat acquisition efforts with those ongoing on the Yakima River to best benefit fish and wildlife in the Urban Growth Area. The parcel ranking process identified 25 properties with the highest fish and wildlife value for habitat acquisition in the Yakima Urban Area. These parcels contain important fish and wildlife corridors on Ahtanum and Wide Hollow Creeks and the Naches River. The fifteen highest-ranking parcels of the 25 parcels identified were considered very high priority for protection of fish and wildlife habitat. These 15 parcels were subsequently grouped into four priority acquisition areas. This Master Plan

  4. Calculation of parameters for inspection planning and evaluation: mixed-oxide fuel fabrication facilities

    International Nuclear Information System (INIS)

    Reardon, P.T.; Mullen, M.F.

    1982-08-01

    As part of Task C.35 (Calculation of Parameters for Inspection Planning and Evaluation) of the US Program of Technical Assistance to IAEA Safeguards, Pacific Northwest Laboratory has performed some quantitative analyses of IAEA inspection activities for mixed-oxide fuel fabrication facilities. There were four distinct efforts involved in this task. These were as follows: show the effect on a material balance verification of using two variables measurement methods in some strata; perform additional calculations for the reference facility described in STR-89; modify the INSPECT computer programs to be used as an after-inspection analysis tool, as well as a preinspection planning tool; provide written comments and explantations of text and graphs of the first draft of STR-89, Safeguards Considerations for Mixed-Oxide Fuel Element Fabrication Facilities, by W. Bahm, T. Shea, and D. Tolchenkov, System Studies Section, IAEA

  5. Riser equipment decontamination engineering task plan

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    On October 15, 1998, two Characterization Project Operations (CPO) employees were found to have contaminated clothing. An operator had 300,000-dpm/100cm2 beta/gamma, no alpha, contamination on his coat sleeve and a Radiation Control Technician (RCT) had 10,000 dpm/100cm2 beta/gamma, no alpha, on his shirt sleeve. The CPO swing shift crew was working in TX tank farm, performing sampling activities at 241-TX-113. TX tank farm is a ''clean farm'' and does not require anti-contamination clothing for entry. The CPO personnel were dressed in normal work clothes. An operator and an RCT were performing a pre-job survey that involved removing bagging around the riser equipment. When the RCT saw that the contamination readings from smear samples of the riser equipment were greater than expected, the job was suspended. Crew members were then directed to areas of lower background radiation for personnel surveys. During personnel surveys, reportable contamination was found on the coat sleeve of the operator who had been involved in the pre-job survey and on the shirt sleeve of the RCT who had been involved in the pre-job survey. No other personnel were found to be contaminated. Because of this off normal event Characterization Engineering was given the following corrective action: Examine the process methodology used for core sampling operations to determine practicality and potential long-term advantages of reducing personnel contact with contaminated equipment. This Engineering Task Plan ensures that LMHC 1998a, Corrective Action No.7 is completely addressed by Characterization Engineering. The deliverable is an Engineering Study that evaluates decontamination of riser equipment components and considers additional engineered features to reduce potential exposure to workers operating the riser equipment. This engineering study shall also address any released design features that have failed to be implemented

  6. Kokkos' Task DAG Capabilities.

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, Harold C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Ibanez, Daniel Alejandro [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-09-01

    This report documents the ASC/ATDM Kokkos deliverable "Production Portable Dy- namic Task DAG Capability." This capability enables applications to create and execute a dynamic task DAG ; a collection of heterogeneous computational tasks with a directed acyclic graph (DAG) of "execute after" dependencies where tasks and their dependencies are dynamically created and destroyed as tasks execute. The Kokkos task scheduler executes the dynamic task DAG on the target execution resource; e.g. a multicore CPU, a manycore CPU such as Intel's Knights Landing (KNL), or an NVIDIA GPU. Several major technical challenges had to be addressed during development of Kokkos' Task DAG capability: (1) portability to a GPU with it's simplified hardware and micro- runtime, (2) thread-scalable memory allocation and deallocation from a bounded pool of memory, (3) thread-scalable scheduler for dynamic task DAG, (4) usability by applications.

  7. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    International Nuclear Information System (INIS)

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff's review of Atlas Corporation's proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs

  8. Integrated Task Plans for the Hanford Environmental Dose Reconstruction Project, FY 1992 through May 1994

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1992-09-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objective of work to be performed through May 1994 is to (1) determine the project's appropriate scope (space, time, radionuclides, pathways and individuals/population groups), (2) determine the project's appropriate level of accuracy (level of uncertainty in dose estimates) for the project, (3) complete model and data development, and (4) estimate doses for the Hanford Thyroid Disease Study (HTDS), representative individuals, and special populations as described herein. The plan for FY 1992 through May 1994 has been prepared based on activities and budgets approved by the Technical Steering Panel (TSP) at its meetings on August 19--20, 1991, and April 23--25, 1992. The activities can be divided into four broad categories: (1) model and data evaluation activities, (2)additional dose estimates, (3) model and data development activities, and (4)technical and communication support

  9. Technical endoscopy

    International Nuclear Information System (INIS)

    Cavalar, K.O.

    1988-01-01

    A survey is provided on different versions of endoscopes, taking into account the new developments of video endoscopy. With a variety of practical examples it is shown that technical tests using endoscopy are a demanding task for nondestructive testing, whose requirements can only be met on a customized basis. (orig./HP) [de

  10. IMRT commissioning: Multiple institution planning and dosimetry comparisons, a report from AAPM Task Group 119

    Energy Technology Data Exchange (ETDEWEB)

    Ezzell, Gary A.; Burmeister, Jay W.; Dogan, Nesrin [Department of Radiation Oncology, Mayo Clinic Scottsdale, 5777 East Mayo Boulevard, MCSB Concourse, Phoenix, Arizona 89054 (United States); and others

    2009-11-15

    AAPM Task Group 119 has produced quantitative confidence limits as baseline expectation values for IMRT commissioning. A set of test cases was developed to assess the overall accuracy of planning and delivery of IMRT treatments. Each test uses contours of targets and avoidance structures drawn within rectangular phantoms. These tests were planned, delivered, measured, and analyzed by nine facilities using a variety of IMRT planning and delivery systems. Each facility had passed the Radiological Physics Center credentialing tests for IMRT. The agreement between the planned and measured doses was determined using ion chamber dosimetry in high and low dose regions, film dosimetry on coronal planes in the phantom with all fields delivered, and planar dosimetry for each field measured perpendicular to the central axis. The planar dose distributions were assessed using gamma criteria of 3%/3 mm. The mean values and standard deviations were used to develop confidence limits for the test results using the concept confidence limit=|mean|+1.96{sigma}. Other facilities can use the test protocol and results as a basis for comparison to this group. Locally derived confidence limits that substantially exceed these baseline values may indicate the need for improved IMRT commissioning.

  11. Responding to the World Health Organization Global Disability Action Plan in Egypt: A Technical Consultancy to develop a National Disability, Health and Rehabilitation Plan

    Directory of Open Access Journals (Sweden)

    Christoph Gutenbrunner

    2018-01-01

    Full Text Available Objective: A technical consultation to develop a National Disability, Health and Rehabilitation Plan (NDHRP for Egypt was carried out in 2015. Its overall goal was to improve health, functioning, well-being, quality of life, and participation of persons with disability in Egypt by supporting the Ministry of Health and Population and other stakeholders to improve access to health services and strengthen health-related rehabilitation services for all persons in need. Methods: The methodological steps of the technical consultation were as follows: collecting and reviewing accessible documents and data; site visits to state institutions, health and rehabilitation services; discussions with relevant stakeholders in rehabilitation, including persons with disability; drafting recommendations based on the principles of the World Report on Disability and the World Health Organization Global Disability Action Plan and the information collected; discussion with stakeholders in a workshop; and preparation of a final report. Results and discussion: The development of a NDHRP was successful and led to recommendations with a good level of consensus among stakeholders in Egypt. The authors hope that the NDHRP will lead to improved rehabilitation service provision, and health and quality of life of persons with disability and chronic health conditions living in Egypt.

  12. Open-plan office noise: The susceptibility and suitability of different cognitive tasks for work in the presence of irrelevant speech

    Directory of Open Access Journals (Sweden)

    Helena Jahncke

    2012-01-01

    Full Text Available The aim of the present study was to test which tasks are suitable for work in open-plan offices according to how susceptible they are to disruption produced by the mere presence of irrelevant speech. The tasks were chosen to tap fundamental capacities of office work involving: search for relevant information, remembering material, counting, and generation of words. The hypothesis was that tasks requiring semantic processing should be impaired by irrelevant speech. To determine the magnitude of performance decrease, two sound conditions (quiet, irrelevant speech were compared. The results showed that tasks based on episodic short-term-memory and rehearsal of the presented material were more sensitive to disruption by irrelevant speech than tasks which did not require rehearsal or were based on long-term memory retrieval. The present study points to the inappropriateness of tasks, such as information search and remembering of material, for work environments within which irrelevant speech is ubiquitous.

  13. Two Approaches to Measuring Task Interdependence in Elementary Schools.

    Science.gov (United States)

    Charters, W. W., Jr.

    This report compares two approaches to measuring task interdependence, a theoretically fruitful concept for analyzing an organization's technical system. Task interdependence exists among operating personnel in the degree that task performance of one operative constrains, augments, or otherwise poses contingencies for the performance of another.…

  14. Summary report on the Solar Consumer Assurance Network (SOLCAN) Program Planning Task in the southern region

    Energy Technology Data Exchange (ETDEWEB)

    Browne, M. B. [comp.

    1981-03-15

    The goal of the SOLCAN Program Planning Task is to assist in the development, at the state and local levels, of consumer assurance approaches that will support the accelerated adoption and effective use of new products promoted by government incentives to consumers to meet our nation's energy needs. The task includes state-conducted evaluations and state SOLCAN meetings to identify consumer assurance mechanisms, assess their effectiveness, and identify and describe alternative means for strengthening consumer and industry assurance in each state. Results of the SOLCAN process are presented, including: a Solar Consumer Protection State Assessment Guide; State Solar Consumer Assurance Resources for Selected States; State Solar Consumer Protection Assessment Interviews for Florida; and state SOLCAN meeting summaries and participants. (LEW)

  15. Development of flight experiment task requirements. Volume 2: Technical Report. Part 2: Appendix H: Tasks-skills data series

    Science.gov (United States)

    Hatterick, G. R.

    1972-01-01

    The data sheets presented contain the results of the task analysis portion of the study to identify skill requirements of space shuttle crew personnel. A comprehensive data base is provided of crew functions, operating environments, task dependencies, and task-skills applicable to a representative cross section of earth orbital research experiments.

  16. Physico-technical irradiation planning for the therapy of oesophagus carcinomas by means of computed whole-body tomography

    International Nuclear Information System (INIS)

    Ammon, J.; Greiner, K.; Kaesberg, P.

    1980-01-01

    It is particularly difficult to establish a physico-technical irradiation plan for the thoracic part of an oesophagus carcinoma. This is due to the considerable modifications of the thoracic cross-section within the longitudinal axis of the radiation field. Therefore, tomographic cross-sections were made of the upper, the middle and the lower plane of the radiation field. The percentage dose distributions could be determined with a process computer (system TPS, Philips) for different irradiation techniques and irradiation equipments. Examinations of 21 patients showed that the best dose distribution, i.e. a distribution which spares the lung and spinal marrow regions adjacent to the target volume, is obtained by an excentric moving field therapy. Furthermore, localisation and dimensions of inhomogeneities are indicated by computer tomography which makes possible to take into consideration these inhomogeneities when calculating the dose. It was found that the irradiation times can so be reduced by more than 20%. We are therefore of the opinion that it is necessary to establish individual cross-sections of the body by computed tomography when elaborating a physico-technical irradiation plan for the treatment of an oesophagus carcinoma. (orig.) [de

  17. Task and Motion Planning for Selective Weed Conrol using a Team of Autonomous Vehicles

    DEFF Research Database (Denmark)

    Hameed, Ibrahim; la Cour-Harbo, Anders; Hansen, Karl Damkjær

    2014-01-01

    with the right amount. In this article, a task and motion planning for a team of autonomous vehicles to reduce chemicals in farming is presented. Field data are collected by small unmanned helicopters equipped with a range of sensors, including multispectral and thermal cameras. Data collected are transmitted...... to a ground station to be analyzed and triggers aerial and ground-based vehicles to start close inspection and/or plant/weed treatment in specified areas. A complete trajectory is generated to enable ground-based vehicle to visit infested areas and start chemical/mechanical weed treatment....

  18. International Thermonuclear Experimental Reactor U.S. Home Team Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Sowder, W. K.

    1998-10-01

    The International Thermonuclear Experimental Reactor (ITER) project is unique in that the work is divided among an international Joint Central Team and four Home Teams, with the overall responsibility for the quality of activities performed during the project residing with the ITER Director. The ultimate responsibility for the adequacy of work performed on tasks assigned to the U.S. Home Team resides with the U.S. Home Team Leader and the U.S. Department of Energy Office of Fusion Energy (DOE-OFE). This document constitutes the quality assurance plan for the ITER U.S. Home Team. This plan describes the controls exercised by U.S. Home Team management and the Performing Institutions to ensure the quality of tasks performed and the data developed for the Engineering Design Activities assigned to the U.S. Home Team and, in particular, the Research and Development Large Projects (7). This plan addresses the DOE quality assurance requirements of 10 CFR 830.120, "Quality Assurance." The plan also describes U.S. Home Team quality commitments to the ITER Quality Assurance Program. The ITER Quality Assurance Program is based on the principles described in the International Atomic Energy Agency Standard No. 50-C-QA, "Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Facilities." Each commitment is supported with preferred implementation methodology that will be used in evaluating the task quality plans to be submitted by the Performing Institutions. The implementing provisions of the program are based on guidance provided in American National Standards Institute/American Society of Mechanical Engineers NQA-1 1994, "Quality Assurance." The individual Performing Institutions will implement the appropriate quality program provisions through their own established quality plans that have been reviewed and found to comply with U.S. Home Team quality assurance plan commitments to the ITER Quality Assurance Program. The extent of quality program provisions

  19. Feasibility of developing a portable driver performance data acquisition system for human factors research: Technical tasks. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Carter, R.J.; Barickman, F.S.; Spelt, P.F.; Schmoyer, R.L.; Kirkpatrick, J.R.

    1998-01-01

    A two-phase, multi-year research program entitled ``development of a portable driver performance data acquisition system for human factors research`` was recently completed. The primary objective of the project was to develop a portable data acquisition system for crash avoidance research (DASCAR) that will allow drive performance data to be collected using a large variety of vehicle types and that would be capable of being installed on a given vehicle type within a relatively short-time frame. During phase 1 a feasibility study for designing and fabricating DASCAR was conducted. In phase 2 of the research DASCAR was actually developed and validated. This technical memorandum documents the results from the feasibility study. It is subdivided into three volumes. Volume one (this report) addresses the last five items in the phase 1 research and the first issue in the second phase of the project. Volumes two and three present the related appendices, and the design specifications developed for DASCAR respectively. The six tasks were oriented toward: identifying parameters and measures; identifying analysis tools and methods; identifying measurement techniques and state-of-the-art hardware and software; developing design requirements and specifications; determining the cost of one or more copies of the proposed data acquisition system; and designing a development plan and constructing DASCAR. This report also covers: the background to the program; the requirements for the project; micro camera testing; heat load calculations for the DASCAR instrumentation package in automobile trunks; phase 2 of the research; the DASCAR hardware and software delivered to the National Highway Traffic Safety Administration; and crash avoidance problems that can be addressed by DASCAR.

  20. IEA HIA Task 37 - Hydrogen Safety

    DEFF Research Database (Denmark)

    Markert, Frank

    The work plan and objectives of this task are designed to support the acceleration of safe implementation of hydrogen infrastructure through coordinated international collaborations and hydrogen safety knowledge dissemination.......The work plan and objectives of this task are designed to support the acceleration of safe implementation of hydrogen infrastructure through coordinated international collaborations and hydrogen safety knowledge dissemination....

  1. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GiS) mbH, Weinheim (Germany)

    2014-05-15

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  2. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  3. Overview of NTCIR-12 Lifelog Task

    OpenAIRE

    Gurrin, Cathal; Joho, Hideo; Hopfgartner, Frank; Zhou, Liting; Albatal, Rami

    2016-01-01

    In this paper we review the NTCIR12-Lifelog pilot task,\\ud which ran at NTCIR-12. We outline the test collection employed,\\ud along with the tasks, the eight submissions and the\\ud findings from this pilot task. We finish by suggesting future\\ud plans for the task.

  4. Technical Work Plan for: Thermodynamic Databases for Chemical Modeling

    International Nuclear Information System (INIS)

    C.F. Jovecolon

    2006-01-01

    The objective of the work scope covered by this Technical Work Plan (TWP) is to correct and improve the Yucca Mountain Project (YMP) thermodynamic databases, to update their documentation, and to ensure reasonable consistency among them. In addition, the work scope will continue to generate database revisions, which are organized and named so as to be transparent to internal and external users and reviewers. Regarding consistency among databases, it is noted that aqueous speciation and mineral solubility data for a given system may differ according to how solubility was determined, and the method used for subsequent retrieval of thermodynamic parameter values from measured data. Of particular concern are the details of the determination of ''infinite dilution'' constants, which involve the use of specific methods for activity coefficient corrections. That is, equilibrium constants developed for a given system for one set of conditions may not be consistent with constants developed for other conditions, depending on the species considered in the chemical reactions and the methods used in the reported studies. Hence, there will be some differences (for example in log K values) between the Pitzer and ''B-dot'' database parameters for the same reactions or species

  5. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff`s review of Atlas Corporation`s proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs.

  6. Predictors of employer satisfaction: technical and non-technical skills.

    Science.gov (United States)

    Danielson, Jared A; Wu, Tsui-Feng; Fales-Williams, Amanda J; Kirk, Ryan A; Preast, Vanessa A

    2012-01-01

    Employers of 2007-2009 graduates from Iowa State University College of Veterinary Medicine were asked to respond to a survey regarding their overall satisfaction with their new employees as well as their new employees' preparation in several technical and non-technical skill areas. Seventy-five responses contained complete data and were used in the analysis. Four technical skill areas (data collection, data interpretation, planning, and taking action) and five non-technical skill areas (interpersonal skills, ability to deal with legal issues, business skills, making referrals, and problem solving) were identified. All of the skill area subscales listed above had appropriate reliability (Cronbach's alpha>0.70) and were positively and significantly correlated with overall employer satisfaction. Results of two simultaneous regression analyses indicated that of the four technical skill areas, taking action is the most salient predictor of employer satisfaction. Of the five non-technical skill areas, interpersonal skills, business skills, making referrals, and problem solving were the most important skills in predicting employer satisfaction. Hierarchical regression analysis revealed that all technical skills explained 25% of the variation in employer satisfaction; non-technical skills explained an additional 42% of the variation in employer satisfaction.

  7. Toward efficient task assignment and motion planning for large-scale underwater missions

    Directory of Open Access Journals (Sweden)

    Somaiyeh MahmoudZadeh

    2016-10-01

    Full Text Available An autonomous underwater vehicle needs to possess a certain degree of autonomy for any particular underwater mission to fulfil the mission objectives successfully and ensure its safety in all stages of the mission in a large-scale operating field. In this article, a novel combinatorial conflict-free task assignment strategy, consisting of an interactive engagement of a local path planner and an adaptive global route planner, is introduced. The method takes advantage of the heuristic search potency of the particle swarm optimization algorithm to address the discrete nature of routing-task assignment approach and the complexity of nondeterministic polynomial-time-hard path planning problem. The proposed hybrid method is highly efficient as a consequence of its reactive guidance framework that guarantees successful completion of missions particularly in cluttered environments. To examine the performance of the method in a context of mission productivity, mission time management, and vehicle safety, a series of simulation studies are undertaken. The results of simulations declare that the proposed method is reliable and robust, particularly in dealing with uncertainties, and it can significantly enhance the level of a vehicle’s autonomy by relying on its reactive nature and capability of providing fast feasible solutions.

  8. Experiment planning using high-level component models at W7-X

    International Nuclear Information System (INIS)

    Lewerentz, Marc; Spring, Anett; Bluhm, Torsten; Heimann, Peter; Hennig, Christine; Kühner, Georg; Kroiss, Hugo; Krom, Johannes G.; Laqua, Heike; Maier, Josef; Riemann, Heike; Schacht, Jörg; Werner, Andreas; Zilker, Manfred

    2012-01-01

    Highlights: ► Introduction of models for an abstract description of fusion experiments. ► Component models support creating feasible experiment programs at planning time. ► Component models contain knowledge about physical and technical constraints. ► Generated views on models allow to present crucial information. - Abstract: The superconducting stellarator Wendelstein 7-X (W7-X) is a fusion device, which is capable of steady state operation. Furthermore W7-X is a very complex technical system. To cope with these requirements a modular and strongly hierarchical component-based control and data acquisition system has been designed. The behavior of W7-X is characterized by thousands of technical parameters of the participating components. The intended sequential change of those parameters during an experiment is defined in an experiment program. Planning such an experiment program is a crucial and complex task. To reduce the complexity an abstract, more physics-oriented high-level layer has been introduced earlier. The so-called high-level (physics) parameters are used to encapsulate technical details. This contribution will focus on the extension of this layer to a high-level component model. It completely describes the behavior of a component for a certain period of time. It allows not only defining simple value ranges but also complex dependencies between physics parameters. This can be: dependencies within components, dependencies between components or temporal dependencies. Component models can now be analyzed to generate various views of an experiment. A first implementation of such an analyze process is already finished. A graphical preview of a planned discharge can be generated from a chronological sequence of component models. This allows physicists to survey complex planned experiment programs at a glance.

  9. Report on the joint meeting of the Division of Development and Technology Plasma/Wall Interaction and High Heat Flux Materials and Components Task Groups

    International Nuclear Information System (INIS)

    Wilson, K.L.

    1985-10-01

    This report of the Joint Meeting of the Division of Development and Technology Plasma/Wall Interaction and High Heat Flux Materials and Components Task Groups contains contributing papers in the following areas: Plasma/Materials Interaction Program and Technical Assessment, High Heat Flux Materials and Components Program and Technical Assessment, Pumped Limiters, Ignition Devices, Program Planning Activities, Compact High Power Density Reactor Requirements, Steady State Tokamaks, and Tritium Plasma Experiments. All these areas involve the consideration of High Heat Flux on Materials and the Interaction of the Plasma with the First Wall. Many of the Test Facilities are described as well

  10. Spent Nuclear Fuel Project operational staffing plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1996-03-01

    Using the Spent Nuclear Fuel (SNF) Project's current process flow concepts and knowledge from cognizant engineering and operational personnel, an initial assessment of the SNF Project radiological exposure and resource requirements was completed. A small project team completed a step by step analysis of fuel movement in the K Basins to the new interim storage location, the Canister Storage Building (CSB). This analysis looked at fuel retrieval, conditioning of the fuel, and transportation of the fuel. This plan describes the staffing structure for fuel processing, fuel movement, and the maintenance and operation (M ampersand O) staffing requirements of the facilities. This initial draft does not identify the support function resources required for M ampersand O, i.e., administrative and engineering (technical support). These will be included in future revisions to the plan. This plan looks at the resource requirements for the SNF subprojects, specifically, the operations of the facilities, balances resources where applicable, rotates crews where applicable, and attempts to use individuals in multi-task assignments. This plan does not apply to the construction phase of planned projects that affect staffing levels of K Basins

  11. Towards common technical standards

    International Nuclear Information System (INIS)

    Rahmat, H.; Suardi, A.R.

    1993-01-01

    In 1989, PETRONAS launched its Total Quality Management (TQM) program. In the same year the decision was taken by the PETRONAS Management to introduce common technical standards group wide. These standards apply to the design, construction, operation and maintenance of all PETRONAS installations in the upstream, downstream and petrochemical sectors. The introduction of common company standards is seen as part of an overall technical management system, which is an integral part of Total Quality Management. The Engineering and Safety Unit in the PETRONAS Central Office in Kuala Lumpur has been charged with the task of putting in place a set of technical standards throughout PETRONAS and its operating units

  12. 48 CFR 1852.216-80 - Task ordering procedure.

    Science.gov (United States)

    2010-10-01

    ... individual task order, accounting and appropriation data. (e) The Contractor shall provide acknowledgement of... conflict between the requirements of the task order and the Contractor's approved task plan, the task order...

  13. THE INFLUENCE OF TWO MODELS OF PHYSICAL EDUCATION PLANNING ON SPORT-TECHNICAL KNOWLEDGE OF SECONDARY SCHOOL FEMALE STUDENTS

    Directory of Open Access Journals (Sweden)

    Živorad Marković

    2009-11-01

    Full Text Available The goal of this research was to determine eventual difference between continuo- us and concentrated model of planning and realization of program contents of Physical Education in relation to sport-technical knowledge of female students. This research was educational experiment with longitudinal character on the specimen of 92 fema- le examinees divided into two sub specimens - according to the criterion of realization of program contents of Physical Education lesson: experimental group with 50 female examinees and control group with 42 secondary school female examinees of year one. Sport-technical knowledge was evaluated with ten variables. Multivariant analysis of the variance, Roy’s test, discriminative analysis and descriptive analysis were applied in processing of data which were acquired by empirical research. Statistically significant differences , in favor of experimental group in all ten researched variables, indicate that the contents of experimental treatment resulted in positive effects in sport-technical knowledge of female students in experimental group.

  14. TCR as supervisor of technical systems

    CERN Document Server

    Laeger, H

    1998-01-01

    Our Technical Control Room (TCR) provides continuous supervision of CERN's technical infrastructure. It also serves the inhabitants of CERN's premises as a contact point in case of problems. Every year we initiate eleven thousand recorded corrective interventions; about half subsequent to user phone calls, the other half to automatic alarms. TCR tasks are essentially fourfold: collect and distribute information on abnormal operation states; supervise those technical systems for which we have a mandate; initiate corrective interventions; and perform corrective on-site interventions outside normal working hours. A TCR operator normally has an education corresponding to a French BTS and initially little professional experience. He holds short-term contracts, up to a maximum of six years. This paper outlines TCR tasks and presents some statistical data. It also indicates relations between users, equipment groups, contract firms and the TCR as go-between. Finally, it gives an account of our seven years experience ...

  15. Evaluation Study of VTAE Wood Technics Programs.

    Science.gov (United States)

    Wisconsin State Board of Vocational, Technical, and Adult Education, Madison.

    A survey of former students of the Wisconsin Vocational, Technical, and Adult Education (VTAE) wood technics programs and employers in woodworking industries was conducted during spring of 1985. General objectives were to determine job classifications, types of businesses, and relative importance of tasks or duties in various woodworking-related…

  16. Gas-Cooled Thermal Reactor Program. Semiannual technical progress report, October 1, 1982-March 3, 1983

    International Nuclear Information System (INIS)

    1983-06-01

    This report provides descriptions and results of the technical effort during the first half of FY 83 on the Gas-Cooled Thermal Reactor Program. The work on Integration and Management (WBS 01) includes the preparation of the Advanced Systems Concept Evaluation Plan and the Advanced Systems Technology Development Plan in addition to the program management activities. The Market Definition (WBS 03) efforts considered the application of the Modular Reactor System with reforming (MRS-R) to the production of methanol and ammonia and the refining of petroleum. Within the Plant Technology (WBS 13) task there were activities to develop anlytical methods for investigation of Coolant Transport Behavior and to define methods and criteria for High Temperature Structural Engineering design. In addition to the work on the advanced HTGR for process heat users, new activities were initiated in support of the HTGR-SC/C Lead plant Protect (WBS 30 and 31). The Plant Simulation task (WBS 31) was initiated to develop a computer code for simulation of plant operation and for plant transient systems analysis. The efforts on the advanced HTGR systems was performed under the Modular Systems task (WBS 41) to study the potential for multiple small reactors to provide lower costs, improved safety, and higher availability than the large monolithic core reactors

  17. EXPLORATION ON TECHNICAL REFORM OF STRATEGIC PLANNING AND URBAN MASTER PLANNING THROUGH THE ANALYSIS ON THEIR RELATIONSHIP%从战略规划与总体规划关系探讨两者技术改革

    Institute of Scientific and Technical Information of China (English)

    赵艳莉; 郑声轩; 张卓如

    2012-01-01

    Through the comparative analysis on the concept features and technical contents of strategic planning and master planning, this paper analyzes the types of urban strategic planning and clarifies the status and role of strategic planning in the planning system of China. Through the case study on the interaction between strategic planning and master planning, the paper elaborates their mutual supporting and complementary relationship, and points out that emphasizing the differentiated development of these two kinds of planning is favorable for the technical progress of planning, and that strategic planning should focus on goal guidance and master planning should strengthen the comprehensive control.%比较分析了战略规划与总体规划的概念特征及技术内容,并梳理城市发展战略规划的几种类型,认识战略规划在我国规划体系中的地位、作用.通过战略规划与总体规划互动的规划案例阐明两者互为支撑、互为补充的关系,提出强调两者的差异化发展有利于规划技术进步,战略规划应突出目标引导性,总体规划应加强综合控制性.

  18. Engineering task plan for the development of a high pressure water drill system for BY-105 saltwell screen installation

    International Nuclear Information System (INIS)

    RITTER, G.A.

    1999-01-01

    This engineering task plan identifies the activities required for developing an ultra high pressure water drill system for installation of a saltwell screen in Tank BY-105. A water drill system is needed to bore through the hard waste material in this tank because of the addition of Portland cement in the 1960s and/or 1970s. The activities identified in this plan include the design, procurement, and qualification testing of the water drill along with readiness preparations including developing operating procedures, training Operations personnel, and conducting an assessment of readiness

  19. The time optimal trajectory planning with limitation of operating task for the Tokamak inspecting manipulator

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Hesheng; Lai, Yinping [Department of Automation,Shanghai Jiao Tong University, Shanghai (China); Key Laboratory of System Control and Information Processing, Ministry of Education of China (China); Chen, Weidong, E-mail: wdchen@sjtu.edu.cn [Department of Automation,Shanghai Jiao Tong University, Shanghai (China); Key Laboratory of System Control and Information Processing, Ministry of Education of China (China)

    2016-12-15

    In this paper, a new optimization model of time optimal trajectory planning with limitation of operating task for the Tokamak inspecting manipulator is designed. The task of this manipulator is to inspect the components of Tokamak, the inspecting velocity of manipulator must be limited in the operating space in order to get the clear pictures. With the limitation of joint velocity, acceleration and jerk, this optimization model can not only get the minimum working time along a specific path, but also ensure the imaging quality of camera through the constraint of inspecting velocity. The upper bound of the scanning speed is not a constant but changes according to the observation distance of camera in real time. The relation between scanning velocity and observation distance is estimated by curve-fitting. Experiment has been carried out to verify the feasibility of optimization model, moreover, the Laplace image sharpness evaluation method is adopted to evaluate the quality of images obtained by the proposed method.

  20. The time optimal trajectory planning with limitation of operating task for the Tokamak inspecting manipulator

    International Nuclear Information System (INIS)

    Wang, Hesheng; Lai, Yinping; Chen, Weidong

    2016-01-01

    In this paper, a new optimization model of time optimal trajectory planning with limitation of operating task for the Tokamak inspecting manipulator is designed. The task of this manipulator is to inspect the components of Tokamak, the inspecting velocity of manipulator must be limited in the operating space in order to get the clear pictures. With the limitation of joint velocity, acceleration and jerk, this optimization model can not only get the minimum working time along a specific path, but also ensure the imaging quality of camera through the constraint of inspecting velocity. The upper bound of the scanning speed is not a constant but changes according to the observation distance of camera in real time. The relation between scanning velocity and observation distance is estimated by curve-fitting. Experiment has been carried out to verify the feasibility of optimization model, moreover, the Laplace image sharpness evaluation method is adopted to evaluate the quality of images obtained by the proposed method.

  1. Radioactive waste isolation in salt: peer review of the Office of Nuclear Waste Isolation's plan to decommission and reclaim exploratory shafts and related facilities

    International Nuclear Information System (INIS)

    Fenster, D.F.; Schubert, J.P.; Zellmer, S.D.; Harrison, W.; Simpson, D.G.; Busch, J.S.

    1984-07-01

    The following recommendations are made for improving the Office of Nuclear Waste Isolation's plan for decommissioning and reclaiming exploratory shafts and other facilities associated with site characterization: (1) Discuss more comprehensively the technical aspects of activities related to decommissioning and reclamation. More detailed information will help convince the staff of the US Nuclear Regulatory Commission and others that the activities as outlined in the plan are properly structured and that the stated goals can be achieved. (2) Address in considerably greater detail how the proposed activities will satisfy specific federal, state, and local laws and regulations. (3) State clearly the precise purpose of the plan, preferably at the beginning and under an appropriate heading. (4) Also under an appropriate heading and immediately after the section on purpose, describe the scope of the plan. The tasks covered by this plan and closely related tasks covered by other appropriate plans should be clearly differentiated. (5) Discuss the possible environmental effects of drilling the exploratory shaft, excavating drifts in salt, and drilling boreholes as part of site characterization. Mitigation activities should be designed to counter specific potential impacts. High priority should be given to minimizing groundwater contamination and restoring the surface to a condition consistent with the proposed land use following completion of characterization activities at sites not chosen for repository construction. (6) Define ambiguous technical terms, either in the text when first introduced or in an appended glossary

  2. Control of heavy loads at nuclear power plants: Resolution of Generic Technical Activity A-36. Technical report

    International Nuclear Information System (INIS)

    George, H.J.

    1980-07-01

    This report summarizes work performed by the NRC staff in the resolution of Generic Technical Activity A-36, Control of Heavy Loads Near Spent Fuel. Generic Technical Activity A-36 is one of the generic technical subjects designated as unresolved safety issues pursuant to Section 210 of the Energy Reorganization Act of 1974. The report describes the technical studies and evaluations performed by the NRC staff, the staff's guidelines based on these studies, and the staff's plans for implementaton of its technical guidelines

  3. National Waste Terminal Storage Program: planning and control plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Objective of the NWTS program planning and control plan is to provide the information necessary for timely and effective OWI management decisions. Purpose is to describe the concepts and techniques that will be utilized by OWI to establish structured, completely planned and controlled technical, cost, and schedule NWTS baselines from which performance or progress can be accurately measured

  4. Detroit Works Long-Term Planning Project: Engagement Strategies for Blending Community and Technical Expertise

    Directory of Open Access Journals (Sweden)

    Toni L. Griffin

    2014-10-01

    Full Text Available In January 2013, civic leaders, community stakeholders, and residents came together to release Detroit Future City: 2012 Detroit Strategic Framework Plan, a guiding blueprint for transforming Detroit from its current state of population loss and excessive vacancy into a model for the reinvention of post-industrial American cities. Three years prior, the U.S. Census had reported that the city had lost 24% of its population over the last decade and had experienced a 20% increase in vacant and abandoned property, bringing total vacancy to roughly the size of Manhattan. In addition to physical and economic challenges, Detroiters had also acknowledged significant barriers to effective civic engagement. Foremost among these barriers were a profound sense of immobilization, planning fatigue, and a general perception of cynicism about planning and engagement efforts. These challenges were compounded by historic racial dynamics and tension. This case study elaborates on the comprehensive and innovative civic engagement executed in a citywide planning process called the Detroit Works Project, which took place from late 2010 through late 2012. For the citywide planning process to be successful and sustainable, civic leaders and project funders committed to a planning initiative that would be different from previous efforts, in large part because the “owners” of the process would be diverse and inclusive across all community sectors. The case study, written by three of the key consultants from the project, describes four key civic engagement strategies deployed in the creation of the strategic framework: (1 addressing profound challenges of culture, race, and politics by deliberately building trust; (2 elevating community expertise by fostering a sense of ownership of the process; (3 blending technical and community expertise; and (4 viewing civic engagement as an ongoing two-way conversation rather than a series of large-scale episodic events. This

  5. Committee on the safety of nuclear installations - Operating plan (2006 - 2009)

    International Nuclear Information System (INIS)

    2007-01-01

    technical disciplines. Temporary task groups may also be established to address specific technical issues. The overall scope and technical goals have been established for CSNI for 2006-2009 (see Section III) consistent with the challenges identified in the joint CSNI/CNRA Strategic Plan. High level, top down guidance is provided to the working groups through the development of a set of safety issues and topics which define the technical areas and issues CSNI activities should focus on. The working groups then each prepare their own integrated plan that defines the specific activities and schedule for addressing the safety issues and topics and accomplishing the objectives and technical goals. In Section IV CSNI working methods are described covering priorities, project management, coordination, cooperation, communication, documentation and self assessment. The Operating Plan describes CSNI responsibility and organisation, overall scope of work and working methods, and is supplemented by the so-called CSNI Activity Report, which contains a description of the updated status of the approved specific activities for all Working Groups (WGs), including new proposals set forth for CSNI approval. While the present document remains basically unchanged in the performance period, the CSNI Activity Report is updated every six months, in correspondence of the CSNI meetings

  6. KNGR core proection calculator, software, verification and validation plan

    International Nuclear Information System (INIS)

    Kim, Jang Yeol; Park, Jong Kyun; Lee, Ki Young; Lee, Jang Soo; Cheon, Se Woo

    2001-05-01

    This document describes the Software Verification and Validation Plan(SVVP) Guidance to be used in reviewing the Software Program Manual(SPM) in Korean Next Generation Reactor(KNGR) projects. This document is intended for a verifier or reviewer who is involved with performing of software verification and validation task activity in KNGR projects. This document includeds the basic philosophy, performing V and V effort, software testing techniques, criteria of review and audit on the safety software V and V activity. Major review topics on safety software addresses three kinds of characteristics based on Standard Review Plan(SRP) Chapter 7, Branch Technical Position(BTP)-14 : management characteristics, implementation characteristics and resources characteristics when reviewing on SVVP. Based on major topics of this document, we have produced the evaluation items list such as checklist in Appendix A

  7. Study on advanced systematic function of the JNC geological disposal technical information integration system. Research document

    International Nuclear Information System (INIS)

    Ishihara, Yoshinao; Fukui, Hiroshi; Sagawa, Hiroshi; Matsunaga, Kenichi; Ito Takaya

    2004-02-01

    In this study, while attaining systematization about the technical know-how mutually utilized between geology environmental field, disposal technology (design) field and safety assessment field, the share function of general information in which the formation of an information share and the use promotion between the technical information management databases built for every field were aimed at as an advancement of the function of JNC Geological Disposal Technical Information Integration System considered, and the system function for realizing considered in integration of technical information. (1) Since the concrete information about geology environment which is gradually updated with progress of stratum disposal research, or increases in reflected suitable for research of design and safety assessment. After arranging the form suitable for systematizing technical information, while arranging the technical information in both the fields of design and safety assessment with the form of two classes based on tasks/works, it systematized planning adjustment about delivery of technical information with geology environmental field. (2) In order to aim at integration of 3-fields technical information of geological disposal, based on the examination result of systematization of technical information, the function of mutual use of the information managed in two or more databases was considered. Moreover, while considering system functions, such as management of the use history of technical information, connection of information use, and a notice of common information, the system operation windows in consideration of the ease of operation was examined. (author)

  8. An overview and guide: planning instructional radio.

    Science.gov (United States)

    Imhoof, M

    1984-03-01

    activities utilized in broadcasts which are contrary to the learners' experience will at best seem strange and at worst be incomprehensible. Curriculum development in an instructional radio project adds more complexity to the planner's task. The most important information needed is whether a new curriculum is to be developed or whether the existing curriculum is to be adapted for radio. Another major analysis task is relating the curriculum to the medium. The project planning team needs to understand the research aims and evaluation methods in instructional radio projects. Sometimes an outside evaluation specialist or team is employed, but in many projects the planning team is responsible for implementing the research design, carrying out the development activities, gathering data, and evaluating the project. Subject matter testing is another technical area of expertise needed by the project team.

  9. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball and W. Zeuner

    2011-01-01

    In this report we will review the main achievements of the Technical Stop and the progress of several centrally-managed projects to support CMS operation and maintenance and prepare the way for upgrades. Overview of the extended Technical Stop  The principal objectives of the extended Technical Stop affecting the detector itself were the installation of the TOTEM T1 telescopes on both ends, the readjustment of the alignment link-disk in YE-2, the replacement of the light-guide sleeves for all PMs of both HFs, and some repairs on TOTEM T2 and CASTOR. The most significant tasks were, however, concentrated on the supporting infrastructure. A detailed line-by-line leak search was performed in the C6F14 cooling system of the Tracker, followed by the installation of variable-frequency drives on the pump motors of the SS1 and SS2 tracker cooling plants to reduce pressure transients during start-up. In the electrical system, larger harmonic filters were installed in ...

  10. Technical and economic assessment of solar hybrid repowering. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-09-01

    Public Service Company of New Mexico (PNM) has performed a Technical and Economic Assessment of Solar Hybrid Repowering under funding by the Department of Energy (DOE), the Electric Power Research Institute (EPRI), Western Energy Supply and Transmission (WEST) Associates, and a number of southwestern utilities. Solar hybrid repowering involves placement of solar hardware adjacent to and connected to existing gas- and oil-fueled electric generation units to displace some of or all the fossil fuel normally used during daylight hours. The subject study assesses the technical economic viability of the solar hybrid repowering concept within the southwestern United States and the PNM system. This document is a final report on the study and its results. The study was divided into the six primary tasks to allow a systematic investigation of the concept: (1) market survey and cost/benefit analysis, (2) study unit selection, (3) conceptual design and cost estimates, (4) unit economic analysis, (5) program planning, future phases, and (6) program management. Reeves Station No. 2 at Albuquerque, New Mexico, was selected for repowering with a design goal of 50 percent (25 MWe). The solar system design is based on the 10 MW solar central receiver pilot plant preliminary design for Barstow, California. SAN--1608-4-2 contains the technical drawings. (WHK)

  11. Riser equipment decontamination engineering task plan; TOPICAL

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    On October 15, 1998, two Characterization Project Operations (CPO) employees were found to have contaminated clothing. An operator had 300,000-dpm/100cm2 beta/gamma, no alpha, contamination on his coat sleeve and a Radiation Control Technician (RCT) had 10,000 dpm/100cm2 beta/gamma, no alpha, on his shirt sleeve. The CPO swing shift crew was working in TX tank farm, performing sampling activities at 241-TX-113. TX tank farm is a ''clean farm'' and does not require anti-contamination clothing for entry. The CPO personnel were dressed in normal work clothes. An operator and an RCT were performing a pre-job survey that involved removing bagging around the riser equipment. When the RCT saw that the contamination readings from smear samples of the riser equipment were greater than expected, the job was suspended. Crew members were then directed to areas of lower background radiation for personnel surveys. During personnel surveys, reportable contamination was found on the coat sleeve of the operator who had been involved in the pre-job survey and on the shirt sleeve of the RCT who had been involved in the pre-job survey. No other personnel were found to be contaminated. Because of this off normal event Characterization Engineering was given the following corrective action: Examine the process methodology used for core sampling operations to determine practicality and potential long-term advantages of reducing personnel contact with contaminated equipment. This Engineering Task Plan ensures that LMHC 1998a, Corrective Action No.7 is completely addressed by Characterization Engineering. The deliverable is an Engineering Study that evaluates decontamination of riser equipment components and considers additional engineered features to reduce potential exposure to workers operating the riser equipment. This engineering study shall also address any released design features that have failed to be implemented

  12. Engineering task plan for flammable gas atmosphere mobile color video camera systems

    International Nuclear Information System (INIS)

    Kohlman, E.H.

    1995-01-01

    This Engineering Task Plan (ETP) describes the design, fabrication, assembly, and testing of the mobile video camera systems. The color video camera systems will be used to observe and record the activities within the vapor space of a tank on a limited exposure basis. The units will be fully mobile and designed for operation in the single-shell flammable gas producing tanks. The objective of this tank is to provide two mobile camera systems for use in flammable gas producing single-shell tanks (SSTs) for the Flammable Gas Tank Safety Program. The camera systems will provide observation, video recording, and monitoring of the activities that occur in the vapor space of applied tanks. The camera systems will be designed to be totally mobile, capable of deployment up to 6.1 meters into a 4 inch (minimum) riser

  13. Review of domestic and international experience on optimization of tests planning for safety related systems at NPP

    International Nuclear Information System (INIS)

    Skalozubov, V.I.; Komarov, Yu.A.; Kolykanov, V.N.; Kochneva, V.Yu.; Gablaya, T.V.

    2009-01-01

    There are represented the basic requirements of normative and operating documents on test periodicity of safety related systems at NPPs, sets out the theoretical methods of test optimization of the technical systems, and analyses foreign engineering methods for changing test periodicity of the NPP systems. Based on this review analyses further tasks are formulated for improvement of the methodical base of optimization of tests planning for safety related systems

  14. State Technical Committee for Accounting. Official Report.

    Science.gov (United States)

    Jensen, Claudia

    This report contains validated task inventory listings for accounting occupations. An introductory report in brief outline form gives background of the work of the technical committee that identified the duties and tasks. This is followed by four attachments which make up most of the document. Attachment A has two parts: (1) an accounting skills…

  15. EQ3/6 geochemical modeling task plan for Nevada Nuclear Waste Storage Investigations (NNWSI)

    Energy Technology Data Exchange (ETDEWEB)

    Isherwood, D.; Wolery, T.

    1984-04-10

    This task plan outlines work needed to upgrade the EQ3/6 geochemical code and expand the supporting data bases to allow the Nevada Nuclear Waste Storage Investigations (NNWSI) to model chemical processes important to the storage of nuclear waste in a tuff repository in the unsaturated zone. The plan covers the fiscal years 1984 to 1988. The scope of work includes the development of sub-models in the EQ3/6 code package for studying the effects of sorption, precipitation kinetics, redox disequilibrium, and radiolysis on radionuclide speciation and solubility. The work also includes a glass/water interactions model and a geochemical flow model which will allow us to study waste form leaching and reactions involving the waste package. A special emphasis is placed on verification of new capabilities as they are developed and code documentation to meet NRC requirements. Data base expansion includes the addition of elements and associated aqueous species and solid phases that are specific to nuclear waste (e.g., actinides and fission products) and the upgrading and documentation of the thermodynamic data for other species of interest.

  16. ALARA plan for the Old Hydrofracture Facility tanks contents removal project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-04-01

    The purpose of the Old Hydrofracture Facility (OHF) Tanks Contents Removal Project is to remove the liquid low-level waste from the five underground storage tanks located at OHF and transfer the resulting slurry to the Melton Valley Storage Tanks facility for treatment and disposal. Among the technical objectives for the OHF Project, there is a specific provision to maintain personnel exposures as low as reasonably achievable (ALARA) during each activity of the project and to protect human health and the environment. The estimated doses and anticipated conditions for accomplishing this project are such that an ALARA Plan is necessary to facilitate formal radiological review of the campaign. This ALARA Plan describes the operational steps necessary for accomplishing the job together with the associated radiological impacts and planned controls. Individual and collective dose estimates are also provided for the various tasks. Any significant changes to this plan (i.e., planned exposures that are greater than 10% of original dose estimates) will require formal revision and concurrence from all parties listed on the approval page. Deviations from this plan (i.e., work outside the scope covered by this plan) also require the preparation of a task-specific ALARA Review that will be amended to this plan with concurrence from all parties listed on the approval page

  17. Applicability of EPRI Decommissioning Pre-Planning Manual to International Decommissioning Projects

    International Nuclear Information System (INIS)

    Lessard, Leo; Kay, Jim; Lefrancois, Donald; Furr, Richard; Lucas, Matthieu; Schauer, Konrad

    2016-01-01

    Industry models for planning the efficient decommissioning of a nuclear power plant continue to evolve. Effective planning is a key to cost control, a critical aspect of decommissioning. In 2001, the Electric Power Research Institute (EPRI) published the 'Decommissioning Pre-Planning Manual', referred to as the 'Manual'. The goal of the Manual was to develop a framework for use in pre-planning the decommissioning of a nuclear power plant. The original research was based on information collected during the active decommissioning of power reactors in New England, and the ongoing decommissioning planning of another reactor still in operation. The research team identified thirty-two (32) major Decommissioning Tasks that support the strategic and tactical planning that can be conducted in advance of plant shutdown. The Decommissioning Tasks were organized in a logical sequence of execution, and sorted in common discipline groupings. Owners of U.S. nuclear plants that have shut down prematurely during the past 5 years have found the EPRI Decommissioning Pre-Planning Manual useful in developing their transition plans from an operating to shutdown facility. Concurrently, during the past 15 years, the IAEA has published numerous technical and safety reports on nuclear reactor decommissioning planning and execution. IAEA's goal is to provide its global members with useful and timely guidance for the planning and execution of nuclear decommissioning projects. This information has been used extensively by international nuclear plant operators. One of the key objectives will be to develop a road-map linking the 32 EPRI Decommissioning Tasks with the comparable (or equivalent) topics covered in the IAEA library of decommissioning knowledge. The logical and convenient structure of the Manual will be cross-referenced to the IAEA topics to aid in organizing the development of decommissioning plans. The road-map will serve to provide a basis for improved

  18. Guidelines for radiation oncology centres in AFRA Member States intending to make a transition from 2-D to 3-D treatment planning and delivery

    International Nuclear Information System (INIS)

    Meghzifene, A.

    2007-01-01

    The IAEA Regional Technical Cooperation Project RAF/6/031 on Medical Physics in Support of Cancer Management aims to strengthen national and regional medical physics capabilities to sustain radiotherapy treatments in the AFRA1 Member States. In particular, it aims at increasing the number of qualified medical physicists in the region as well as improving the level of medical physics by establishing regional training and continuous development programmes. Eighteen National Project Coordinators (NPCs) nominated by participating AFRA Member States are engaged in the project. RAF/6/031 was approved by the IAEA in 2005 for an initial five year duration. A coordination meeting is held every two years where the NPCs and IAEA Technical and Project Management Officers establish the project's training and development programmes. During the first coordination meeting at Cape Town in November 2005, it was decided to convene a Task Force Meeting to review the status of treatment planning in radiotherapy in AFRA Member States and prepare a guidance document on the transition from 2-D to 3-D treatment planning. This Task Force Meeting took place at the IAEA's Headquarters in Vienna on 23-26 April 2007. The resulting guidance document highlights the milestones that have to be achieved by radiotherapy centres routinely implementing 2-D computerized treatment planning before making a transition to 3-D treatment planning and delivery. The implementation of 3-D planning by radiotherapy centres that have not yet met these milestones could lead to serious mistakes in treatments. A self-assessment questionnaire was also prepared during the Task Force Meeting. Member States that are planning to make a transition to 3-D planning are advised to assess their existing capabilities through this questionnaire. The same questionnaire could also be useful for the IAEA staff and external experts when assessing the readiness of a radiotherapy centre to make a safe and effective transition to 3-D

  19. Program plan for the DOE Office of Fusion Energy First Wall/Blanket/Shield Engineering Technology Program. Volume II. Detailed technical plan. Revision 2

    International Nuclear Information System (INIS)

    1982-08-01

    The four sections which comprise Part II describe in detail the technical basis for each of the four Program Elements (PE's) of the FWBS Engineering Technology Program (ETP). Each PE is planned to be executed in a number of phases. The purpose of the DTP's is to delineate detailed near-term research, development, and testing required to establish a FWBS engineering data base. Optimum testing strategies and construction of test facilities where needed are identified. The DTP's are based on guidelines given by Argonne National Laboratory which included the basic programmatic goals and the requirements for the types of tests and test conditions

  20. Cognitive training for technical and non-technical skills in robotic surgery: a randomised controlled trial.

    Science.gov (United States)

    Raison, Nicholas; Ahmed, Kamran; Abe, Takashige; Brunckhorst, Oliver; Novara, Giacomo; Buffi, Nicolò; McIlhenny, Craig; van der Poel, Henk; van Hemelrijck, Mieke; Gavazzi, Andrea; Dasgupta, Prokar

    2018-05-07

    To investigate the effectiveness of motor imagery (MI) for technical skill and non-technical skill (NTS) training in minimally invasive surgery (MIS). A single-blind, parallel-group randomised controlled trial was conducted at the Vattikuti Institute of Robotic Surgery, King's College London. Novice surgeons were recruited by open invitation in 2015. After basic robotic skills training, participants underwent simple randomisation to either MI training or standard training. All participants completed a robotic urethrovesical anastomosis task within a simulated operating room. In addition to the technical task, participants were required to manage three scripted NTS scenarios. Assessment was performed by five blinded expert surgeons and a NTS expert using validated tools for evaluating technical skills [Global Evaluative Assessment of Robotic Skills (GEARS)] and NTS [Non-Technical Skills for Surgeons (NOTSS)]. Quality of MI was assessed using a revised Movement Imagery Questionnaire (MIQ). In all, 33 participants underwent MI training and 29 underwent standard training. Interrater reliability was high, Krippendorff's α = 0.85. After MI training, the mean (sd) GEARS score was significantly higher than after standard training, at 13.1 (3.25) vs 11.4 (2.97) (P = 0.03). There was no difference in mean NOTSS scores, at 25.8 vs 26.4 (P = 0.77). MI training was successful with significantly higher imagery scores than standard training (mean MIQ score 5.1 vs 4.5, P = 0.04). Motor imagery is an effective training tool for improving technical skill in MIS even in novice participants. No beneficial effect for NTS was found. © 2018 The Authors BJU International © 2018 BJU International Published by John Wiley & Sons Ltd.

  1. External plans for radiological emergency; Plan de emergencia radiologica externo

    Energy Technology Data Exchange (ETDEWEB)

    Suarez, G; Vizuet G, J; Benitez S, J A [Instituto Nacional de Investigaciones Nucleares, A.P. 18-1027, 11801 Mexico D.F. (Mexico)

    1999-07-01

    Since 1989, the National Institute of Nuclear Research in Mexico shares in the task of Food and Water Control corresponding to the FT-86 task force of External Plans for Radiological Emergency (PERE), in charge of the Veracruz Health Services. In the PERE preparation stage previous actions are necessary developed for the preparation and updating of this plan and the task organization with the purpose to maintaining standing and operable in any time and circumstance, the capability to response in the face of an emergency. This stage englobes activities which must be realized before to carry out the Plan as they are the specialized training of personnel which participates and the execution of exercises and simulacrums. Until 1998, training and exercises for this task had been realized under diverse possible sceneries but in conditions that simulated the presence of radioactive material. For this reason, it should be emphasized the training realized during the days 6th, 7th, 8th July, 1999, in the emergency planning zone of the Plan, which to carry out using radioactive material. The National Institute of Nuclear Research had in charge of the training. This work describes all the activities for the realization of this training. (Author)

  2. Strategic Planning and Values in Secondary School

    Directory of Open Access Journals (Sweden)

    Damjana Gruden

    2012-06-01

    Full Text Available RQ: Which factors have a decisive influence on a school’s strategic development?Purpose: The purpose of this research is the improvement of school development and the goal of this research study was to prepare a draft for strategic planning.Method: Qualitative method is used in the first phase of the research study. An annual interview was conducted with secondary technical and vocational school teaching staff. In the second phase of this research study, a survey with one question was distributed to the teaching staff. The question on the survey referred to teachersvalues that stemmed from the interviews. The directed question was on the values that that should be emphasized in assisting the school to prepare a strategic development plan.Results: The results of this research study showed that strategic development of the school is based on values and activities that provide for quality education,professional and practical knowledge, strengthen and develop interpersonal relations and provide good connections between schools, craftsmen, and the economy.Organization: By defining the school’s priorities, it will become easier for the staff to prepare the school’s development strategy and action plans for individual tasks.Society: Awareness and developing values through activities at school provides support to adolescents and young adults in developing their life style. Values lead the behavior of individuals and consequently,are very important for society.Originality: Through the research study the school obtained thebasic values that will be used in drafting a development plan. This will be the first such document for the school. Up until now planning has been performed only in terms of short-term planning within the annual work plan.Limitations: The survey was conducted among the staff of one vocational and technical secondary school. Further research would be required to include parents and students and to start introducing evaluation and

  3. Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant

    International Nuclear Information System (INIS)

    COX, G.J.

    1999-01-01

    This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP. This plan presents the overall description, mission, work scope, and planning for the Plutonium Finishing Plant (PFP) Maintain Safe and Compliant Conditions Project at PFP. This project includes all tasks required to maintain the safety boundary for the PFP Complex, except for the 2736-2 Vault Complex and the 234-52 vaults and vault-type rooms. The intent of this plan is to describe how this project will be managed and integrated with the stabilization, and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines that will manage the execution of this project. It describes the organizational approach and roles/responsibilities implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action

  4. Performance improvement plan in customer technical services

    International Nuclear Information System (INIS)

    Lachambre, L.

    1995-01-01

    This presentation centred around the philosophy, goals, and initiatives associated with Gaz Metropolitain's performance improvement plan. Various aspects of the plan including customer surveys, new customer service policies, the creation of small working units, the decentralization of the Montreal service department, and customer-harmonized shift schedules were explored. Implementation of new service plans and contracts, the formation of improvement groups related to human resources, human resource and productivity management, leadership training, and the use of performance indicators were also explained

  5. Application of objective clinical human reliability analysis (OCHRA) in assessment of technical performance in laparoscopic rectal cancer surgery.

    Science.gov (United States)

    Foster, J D; Miskovic, D; Allison, A S; Conti, J A; Ockrim, J; Cooper, E J; Hanna, G B; Francis, N K

    2016-06-01

    Laparoscopic rectal resection is technically challenging, with outcomes dependent upon technical performance. No robust objective assessment tool exists for laparoscopic rectal resection surgery. This study aimed to investigate the application of the objective clinical human reliability analysis (OCHRA) technique for assessing technical performance of laparoscopic rectal surgery and explore the validity and reliability of this technique. Laparoscopic rectal cancer resection operations were described in the format of a hierarchical task analysis. Potential technical errors were defined. The OCHRA technique was used to identify technical errors enacted in videos of twenty consecutive laparoscopic rectal cancer resection operations from a single site. The procedural task, spatial location, and circumstances of all identified errors were logged. Clinical validity was assessed through correlation with clinical outcomes; reliability was assessed by test-retest. A total of 335 execution errors identified, with a median 15 per operation. More errors were observed during pelvic tasks compared with abdominal tasks (p technical performance of laparoscopic rectal surgery.

  6. Report of the National Technical Planning Group on Uranium Tailings Research

    International Nuclear Information System (INIS)

    Lapp, P.A.

    1981-09-01

    The National Technical Planning Group on Uranium Tailings Research was formed in 1980 to review present activities and plan a research program on the management of wastes after a mine and mill have shut down. At present there are more than 100 million tonnes of uranium tailings on the surface in Canada. Most of these are under management; however, some 8 million tonnes have been abandoned completely. The group concluded that: 1) there has been no systematic attempt to collect and organize the results of measurements already made on tailings; 2) there is an inadequate understanding of the processes that take place in tailings and in the pathways to the biosphere; 3) there is insufficient evidence on the extent of the long-term problem in the closeout of a uranium tailings basin; 4) there is a need to establish standardized measurement methodologies to improve the quality of data taken at different sites across Canada; 5) generic research and development on tailings disposal technology should be within the scope of a national program, whereas site-specific work is the purview of the mines and regulatory agencies; and 6) the uranium producers' contribution to the national tailings program should be their research on site-specific disposal alternatives. The first of these conclusions leads to the proposal to establish a national uranium tailings research program. The second suggests the need for a modelling program, the third and fourth for a national measurement program, and the remaining conclusions refer to disposal technologies research. The conclusions form the basis for a set of recommendations on uranium tailings research

  7. Visualizing interdependencies in technical design

    NARCIS (Netherlands)

    Oosterman, B.J.; Gaalman, G.J.C.; Kuijpers, F.P.J.; Riiahuhta, A.; Pulkkinen, A.

    2001-01-01

    The control and understanding of complex design processes is an important issue in practice and theory. Recent research shows that documentation and analysis of technical interactions between design tasks (using Design Structure Matrices) gives a thorough understanding of the underlying complex

  8. Guam Initial Technical Assessment Report

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, I.; Conrad, M.; Haase, S.; Hotchkiss, E.; McNutt, P.

    2011-04-01

    Under an interagency agreement, funded by the Department of Interior's (DOI) Office of Insular Affairs (OIA), the National Renewable Energy Laboratory (NREL) was tasked to deliver technical assistance to the island of Guam by conducting an island initial technical assessment that would lay out energy consumption and production data and establish a baseline. This assessment will be used to conduct future analysis and studies by NREL that will estimate energy efficiency and renewable energy potential for the island of Guam.

  9. Next Generation Nuclear Plant Methods Technical Program Plan -- PLN-2498

    Energy Technology Data Exchange (ETDEWEB)

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2010-09-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  10. Biogeography-based combinatorial strategy for efficient autonomous underwater vehicle motion planning and task-time management

    Science.gov (United States)

    Zadeh, S. M.; Powers, D. M. W.; Sammut, K.; Yazdani, A. M.

    2016-12-01

    Autonomous Underwater Vehicles (AUVs) are capable of spending long periods of time for carrying out various underwater missions and marine tasks. In this paper, a novel conflict-free motion planning framework is introduced to enhance underwater vehicle's mission performance by completing maximum number of highest priority tasks in a limited time through a large scale waypoint cluttered operating field, and ensuring safe deployment during the mission. The proposed combinatorial route-path planner model takes the advantages of the Biogeography-Based Optimization (BBO) algorithm toward satisfying objectives of both higher-lower level motion planners and guarantees maximization of the mission productivity for a single vehicle operation. The performance of the model is investigated under different scenarios including the particular cost constraints in time-varying operating fields. To show the reliability of the proposed model, performance of each motion planner assessed separately and then statistical analysis is undertaken to evaluate the total performance of the entire model. The simulation results indicate the stability of the contributed model and its feasible application for real experiments.

  11. Safety against releases in severe accidents. Annual report 1996. Project plan 1997; Saekerhet mot utslaepp vid reaktorhaverier. Aarsrapport 1996. Plans 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    The work scope of the RAK-2 project is divided into three sub-projects: RAK-2.1 Severe Accident Phenomenology; RAK-2.2 Computerised Accident Management; RAK-2.3 Reactors In Nordic Surroundings. The work in subproject 1 progresses roughly according to budget and time schedule. Some adjustments in the technical work scope were made during 1996. Main tasks of RAK-2.1 in 1996: Complete recriticality studies for Nordic BWRs; Investigate phenomena related to late phase melt progression; Issue and NKS Final Technical Report on KTH experiments. Main tasks of RAK-2.2 in 1996: CAMS would be further developed with signal validation, tracking simulation, state identification and PSA and risk monitoring applications; Carry out a feasibility study for development of a PWR version of CAMS in collaboration with EdF, France; Use CAMS in the Halden Man-Machine laboratory to perform human factor studies. Main tasks of RAK-2.3 in 1996: Collect and report data from the British reactor types AGR, MAGNOX and PWR; Make a report on accidents in nuclear ships; Put the collected data together in a common data base covering neighbour reactors treated in SIK-3 and RAK-2.3; Update the data in the former SIK-3 report if needed. The work in project 2 progresses according to plans. The data collection of British reactors with in sub-project 3 has been delayed significantly due to difficulty of obtaining information from some of the British utilities, but the problems are expected to be solved by the end of 1997. (EG).

  12. Radiological emergencies - planning and preparedness

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-12-31

    This information and training film in three parts deals with the technical background for emergency planning, emergency planning concepts and emergency preparedness. It describes the technical characteristics of radiological emergencies on which important emergency planning concepts are based and the purpose of those concepts. The film also demonstrates how emergency organizations must work together to ensure adequate preparedness. The programme reflects the standards, guidance and recommendations of the International Atomic Energy Agency

  13. Work plan for upgrading the 241-A-701 compressed air system and motor control center. Revision 1

    International Nuclear Information System (INIS)

    Carpenter, K.E.

    1995-01-01

    This work plan will outline the responsibilities associated with the 241-A-701 Compressed Air System (CAS) and Motor Control Center (MCC) upgrades. All activities required to design, install, test, and operate the modified systems are addressed in this document. Upgrades Technical Support (UTS) of TWRS Engineering is responsible for the completion of all tasks associated with this upgrade. UTS will coordinate the upgrade activities, and ensure all tasks are successfully completed on or before the scheduled dates. The primary objective of the 241-A-701 Compressor and MCC Upgrade is to provide a reliable source of process and instrument compressed air to the A, AX, AY, and AZ tank farms

  14. Configuration Management Plan for K Basins

    International Nuclear Information System (INIS)

    Weir, W.R.; Laney, T.

    1995-01-01

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Programclose quotes

  15. Relationship between non-technical skills and technical performance during cardiopulmonary resuscitation: does stress have an influence?

    NARCIS (Netherlands)

    Krage, R.; Zwaan, L.; Tjon Soei Len, L.; Kolenbrander, M.; Groeningen, D. van; Loer, S.A.; Wagner, C.; Schober, P.

    2017-01-01

    Background: Non-technical skills, such as task management, leadership, situational awareness, communication and decision-making refer to cognitive, behavioural and social skills that contribute to safe and efficient team performance. The importance of these skills during cardiopulmonary

  16. Experiences with a technically oriented plant management system; Erfahrungen mit einem technisch orientierten Betriebs-Management-System

    Energy Technology Data Exchange (ETDEWEB)

    Haffmann, E. [GiS Gesellschaft fuer integrierte Systemplanung mbH, Erlangen (Germany)

    2000-07-01

    This contribution first deals with the duality of mercantile and technical plant management systems. The following aspects are considered: reasons for and history of this duality; different approaches taken by mercantile and technical plant management systems; differences in the standardisability of mercantile and technical tasks. Dissolution of the duality through coordinated interplay. The author then goes on to explain the most important components of technically oriented maintenance management. These include the collection of technical plant data (with maintenance-relevant data and relations); the establishment of recurring tasks, the commissioning method (involving occupational safety, packaging and evaluation), compilation of manuals, reporting and accompanying plant documentation. The following tools are useful for DP-assisted maintenance: depiction of organisational and operational structures (authorisation system + IBFS application); workflow systems; modelling (data and object models); navigators; form and dialogue generators; integration of external software (project planning, CAD and Office); interface to mercantile systems. Some highlights of the C/S-IBFS were demonstrated in practice at the symposium. [German] Das Referat behandelt zunaechst die Dualitaet von kaufmaennischen und technischen Betriebs-Management-Systemen anhand folgender Aspekte: - Gruende und Historie dieser Dualitaet, - unterschiedliche Loesungsansaetze von kaufmaennischen und technischen Betriebs-Management-Systemen, - unterschiedliche Standardisierbarkeit von kaufmaennischen und technischen Aufgabenstellungen, - Aufloesung der Dualitaet durch koordniertes Zusammenwirken. Sodann werden wichtige Bausteine eines technisch orientierten Instandhaltungs-Managements erlaeutert. Dazu gehoeren die technische Anlagenerfassung (mit instandhaltungsrelevanten Daten und Relationen), die Einrichtung wiederkehrender Aufgaben, das Arbeitsauftragsverfahren (mit Arbeitssicherheit, Paketierung und

  17. Risk-informed approach in US-APWR technical specifications

    International Nuclear Information System (INIS)

    Saji, Etsuro; Tanaka, Futoshi; Kuroiwa, Katsuya; Kawai, Katsunori

    2009-01-01

    The Risk-Managed Technical Specifications and the Surveillance Frequency Control Program have been adopted in the US-APWR Technical Specifications. These risk-informed approaches are unique among the technical specifications for the advanced light water reactor designs adopted by planned nuclear power stations in the United States. (author)

  18. Assessing family planning service-delivery skills in Kenya.

    Science.gov (United States)

    Valadez, J J; Transgrud, R; Mbugua, M; Smith, T

    1997-06-01

    This report demonstrates the use of Lot Quality Assurance Sampling (LQAS) to evaluate the technical competence of two cohorts of family planning service providers in Kenya trained with a new curriculum. One cohort had just finished training within two months of the study. The other cohort was the first group trained with the new curriculum about one year before the study. LQAS was adapted from industrial and other public health applications to assess both the individual competence of 30 service providers and the competence of each cohort. Results show that Cohorts One and Two did not differ markedly in the number of tasks needing improvement. However, both cohorts exhibited more tasks needing improvement in counseling skills as compared with physical examination skills or with all other skills. Care-givers who were not currently providing services accounted for most service-delivery problems. This result suggests that providers' use of their skills explains their ability to retain service-delivery skills learned in training to a greater degree than does the amount of time elapsed since they were trained. LQAS proved to be a rapid, easy-to-use empirical method for management decisionmaking for improvement of a family planning training curriculum and services.

  19. Half-liter supernatant sampler system engineering work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    The Tank Waste Remediation System (TWRS) pretreatment facility project W-236B, known as the Initial Pretreatment Module (IPM), requires samples of supernatants and sludges from 200 Area tank farms for planned hot testing work in support of IPM design. The IPM project has proposed the development of several new sampler systems. These systems include a 0.5-l supernatant sampler, 3-l and 25-l supernatant and sludge samplers, and a 4,000-l sampler system. The 0.5-l sampler will support IPM sampling needs in the 1 to 3 l range starting in late fiscal year 1995. This sampler is intended to be used in conjunction with the existing 100 ml bottle-on-a-string. The 3-l and 25-l systems will be based on the Savannah River Site's sampler system and will support IPM sampling needs in the 3 to 100 liter range. Most of the hot testing required for design of the IPM must be accomplished in the next 3 years. This work plan defines the tasks associated with the development of a 0.5-l sampler system. This system will be referred to as the Half-Liter Supernatant Sampler System (HLSSS). Specifically, this work plan will define the scope of work, identify organizational responsibilities, identify major technical requirements, describe configuration control and verification requirements, and provide estimated costs and schedule. The sampler system will be fully operational, including trained staff and operating procedures, upon completion of this task

  20. Work plan for phase 1A paleochannel studies at the Cheney disposal cell, Grand Junction, Colorado: Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    This document will serve as a Work Plan for continuing paleochannel characterization activities at the Cheney disposal site near Grand Junction, Colorado. Elevated levels of nitrate were encountered in ground water from two monitor wells installed in alluvial paleochannels near the Cheney disposal cell in 1994. This triggered a series of investigations (Phase 1) designed to determine the source of nitrate and other chemical constituents in ground water at the site. A comprehensive summary of the Phase 1 field investigations (limited to passive monitoring and modeling studies) conducted by the Remedial Action Contractor (RAC) and Technical Assistance Contractor (TAC) to date is provided in Section 2.0 of this document. Results of Phase 1 were inconclusive regarding the potential interaction between the disposal cell and the paleochannels, so additional Phase 1A investigations are planned. Recommendations for Phase 1A tasks and possible future activities are discussed in Section 3.0. Detailed information on the implementation of the proposed Phase 1A tasks appears in Section 4.0 and will provide the basis for Statements of Work (SOW) for each of these tasks. A detailed sampling plan is provided to ensure quality and a consistency with previous data collection efforts.

  1. Work plan for phase 1A paleochannel studies at the Cheney disposal cell, Grand Junction, Colorado: Draft

    International Nuclear Information System (INIS)

    1996-11-01

    This document will serve as a Work Plan for continuing paleochannel characterization activities at the Cheney disposal site near Grand Junction, Colorado. Elevated levels of nitrate were encountered in ground water from two monitor wells installed in alluvial paleochannels near the Cheney disposal cell in 1994. This triggered a series of investigations (Phase 1) designed to determine the source of nitrate and other chemical constituents in ground water at the site. A comprehensive summary of the Phase 1 field investigations (limited to passive monitoring and modeling studies) conducted by the Remedial Action Contractor (RAC) and Technical Assistance Contractor (TAC) to date is provided in Section 2.0 of this document. Results of Phase 1 were inconclusive regarding the potential interaction between the disposal cell and the paleochannels, so additional Phase 1A investigations are planned. Recommendations for Phase 1A tasks and possible future activities are discussed in Section 3.0. Detailed information on the implementation of the proposed Phase 1A tasks appears in Section 4.0 and will provide the basis for Statements of Work (SOW) for each of these tasks. A detailed sampling plan is provided to ensure quality and a consistency with previous data collection efforts

  2. Relationship between non-technical skills and technical performance during cardiopulmonary resuscitation: Does stress have an influence?

    NARCIS (Netherlands)

    Krage, R. (Ralf); L. Zwaan (Laura); Tjon Soei Len, L. (Lian); Kolenbrander, M.W. (Mark W); Van Groeningen, D. (DIck); S.A. Loer (Stephan A.); C. Wagner (Cordula); P. Schober (P.)

    2017-01-01

    textabstractBackground Non-technical skills, such as task management, leadership, situational awareness, communication and decision-making refer to cognitive, behavioural and social skills that contribute to safe and efficient team performance. The importance of these skills during cardiopulmonary

  3. Radiation protection research projects. Program report 2015. Report on research program radiation protection of the Federal ministry for environment, nature conservation and reactor safety with technical and administrative steering by the Bundesamt fuer Strahlenschutz; Strahlenschutzforschung. Programmreport 2015. Bericht ueber das vom Bundesamt fuer Strahlenschutz fachlich begleitete und administrativ umgesetzte Forschungsprogramm Strahlenschutz des Bundesministeriums fuer Umwelt, Naturschutz, Bau und Reaktorsicherheit

    Energy Technology Data Exchange (ETDEWEB)

    Schmitt-Hannig, Annemarie; Loebke-Reinl, Angelika; Peter, Josef; Goedde, Ralph; Hachenberger, Claudia; Trugenberger-Schnabel, Angela (comps.)

    2016-08-15

    On behalf of the Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (BMUB) the Federal Office for Radiation Protection (BfS) awards research grants for projects in the field of radiation protection. The findings of these projects serve as decision aiding information in the development of radiation protection regulations as well as in the fulfilment of specific tasks in the field of radiation protection. The tasks of the Federal Office for Radiation Protection involve planning, technical and administrative preparation, awarding of contracts, general support as well as the technical evaluation of research and study projects. This report provides information on results, i. e. preliminary (in the form of status reports) and, where applicable, final results of radiation protection projects within the BMUB's Environmental Research Plan for the year 2015.

  4. Technical aspects of the integration of three-dimensional treatment planning dose parameters (GEC-ESTRO Working Group) into pre-implant planning for LDR gynecological interstitial brachytherapy.

    Science.gov (United States)

    Chi, A; Gao, M; Nguyen, N P; Albuquerque, K

    2009-06-01

    This study investigates the technical feasibility of pre-implant image-based treatment planning for LDR GYN interstitial brachytherapy(IB) based on the GEC-ESTRO guidelines. Initially, a virtual plan is generated based on the prescription dose and GEC-ESTRO defined OAR dose constraints with a pre-implant CT. After the actual implant, a regular diagnostic CT was obtained and fused with our pre-implant scan/initial treatment plan in our planning software. The Flexi-needle position changes, and treatment plan modifications were made if needed. Dose values were normalized to equivalent doses in 2 Gy fractions (LQED 2 Gy) derived from the linear-quadratic model with alpha/beta of 3 for late responding tissues and alpha/beta of 10 for early responding tissues. D(90) to the CTV, which was gross tumor (GTV) at the time of brachytherapy with a margin to count for microscopic disease, was 84.7 +/- 4.9% of the prescribed dose. The OAR doses were evaluated by D(2cc) (EBRT+IB). Mean D(2cc) values (LQED(2Gy)) for the rectum, bladder, sigmoid, and small bowel were the following: 63.7 +/- 8.4 Gy, 61.2 +/- 6.9 Gy, 48.0 +/- 3.5 Gy, and 49.9 +/- 4.2 Gy. This study confirms the feasibility of applying the GEC-ESTRO recommended dose parameters in pre-implant CT-based treatment planning in GYN IB. In the process, this pre-implant technique also demonstrates a good approximation of the target volume dose coverage, and doses to the OARs.

  5. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the sediment transport modeling task

    International Nuclear Information System (INIS)

    Holt, V.L.; Baron, L.A.

    1994-05-01

    This site-specific Work Plan/Health and Safety Checklist (WP/HSC) is a supplement to the general health and safety plan (HASP) for Waste Area Grouping (WAG) 2 remedial investigation and site investigation (WAG 2 RI ampersand SI) activities [Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169)] and provides specific details and requirements for the WAG 2 RI ampersand SI Sediment Transport Modeling Task. This WP/HSC identifies specific site operations, site hazards, and any recommendations by Oak Ridge National Laboratory (ORNL) health and safety organizations [i.e., Industrial Hygiene (IH), Health Physics (HP), and/or Industrial Safety] that would contribute to the safe completion of the WAG 2 RI ampersand SI. Together, the general HASP for the WAG 2 RI ampersand SI (ORNL/ER-169) and the completed site-specific WP/HSC meet the health and safety planning requirements specified by 29 CFR 1910.120 and the ORNL Hazardous Waste Operations and Emergency Response (HAZWOPER) Program Manual. In addition to the health and safety information provided in the general HASP for the WAG 2 RI ampersand SI, details concerning the site-specific task are elaborated in this site-specific WP/HSC, and both documents, as well as all pertinent procedures referenced therein, will be reviewed by all field personnel prior to beginning operations

  6. Task A. Study of large P/sub T/ direct photon production at the ISR. Task B. Direct photon production at the tevatron (E-706). Task C. Search for fractional charge particles in semiconductors. Progress report, June 1, 1983-May 31, 1984

    International Nuclear Information System (INIS)

    Cleland, W.E.; Coon, D.D.; Engels, E. Jr.; Shepard, P.F.; Thompson, J.A.

    1984-01-01

    Task A is the Pitt contingent of the Axial Field Spectrometer Collaboration, performing experiment R807/808 at CERN. The experiment has studied several topics related to study of high P/sub T/ phenomena such as production of jets at high E/sub T/ and a comparison of their properties with jets seen in e + e - . We are working primarily on those aspects of the experiment involving reactions with photons in the final state. We are completing an analysis of prompt photons and pions produced at 11 0 in the center of mass, from data taken in 1982. Presently, new data are being taken with two large NaI arrays in place. With these data, we are studying low P/sub T/ (20 to 200 MeV/c) photon production as well as prompt photons in the range 1.5 < P/sub T/ < 4 GeV/c. For the 1.5 - 4 GeV/c data we plan to compare single photon production in pp and anti pp collisions. Task B is the Pitt contingent of the E706 collaboration, which is studying prompt photon production in πp and pp collisions at the Tevatron. The major contribution of the Pitt effort to the experiment is the provision of the array of semiconductor detectors required for the charged particle spectrometer to be used in the study of correlated hadronic jets. Task C is the search for fractional charge in semiconductors. Although the physics goals of this experiment are removed from those of the other tasks, the technical overlap with task B is extremely important. The construction and testing of semiconductor detectors requires specialized semiconductor physics knowledge and instrumentation, both of which are being developed concurrently by these two tasks. 109 references

  7. Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 3

    Science.gov (United States)

    Levak, Daniel

    1993-01-01

    The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F-1A Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results, and the program cost estimates are described in more detail in Volume 1 - Executive Summary and in individual Final Task Reports.

  8. BWR feedwater nozzle and control rod drive return line nozzle cracking: resolution of generic technical activity A-10. Technical report

    International Nuclear Information System (INIS)

    Snaider, R.

    1980-11-01

    This report summarizes work performed by the NRC staff in the resolution of Generic Technical Activity A-10, 'BWR Nozzle Cracking'. Generic Technical Activity A-10 is one of the generic technical subjects designated as 'unresolved safety issues' pursuant to Section 210 of the Energy Reorganization Act of 1974. The report describes the technical issues, the technical studies and analyses performed by the General Electric Company and the NRC staff, the staff's technical positions based on these studies, and the staff's plans for continued implementation of its technical positions. It also provides information for further work to resolve the non-destructive examination issue

  9. Operational Readiness Review Plan for the Radioisotope Thermoelectric Generator Materials Production Tasks

    Science.gov (United States)

    Cooper, R. H.; Martin, M. M.; Riggs, C. R.; Beatty, R. L.; Ohriner, E. K.; Escher, R. N.

    1990-04-19

    In October 1989, a US shuttle lifted off from Cape Kennedy carrying the spacecraft Galileo on its mission to Jupiter. In November 1990, a second spacecraft, Ulysses, will be launched from Cape Kennedy with a mission to study the polar regions of the sun. The prime source of power for both spacecraft is a series of radioisotope thermoelectric generators (RTGs), which use plutonium oxide (plutonia) as a heat source. Several of the key components in this power system are required to ensure the safety of both the public and the environment and were manufactured at Oak Ridge National Laboratory (ORNL) in the 1980 to 1983 period. For these two missions, Martin Marietta Energy Systems, Inc. (Energy Systems), will provide an iridium alloy component used to contain the plutonia heat source and a carbon composite material that serves as a thermal insulator. ORNL alone will continue to fabricate the carbon composite material. Because of the importance to DOE that Energy Systems deliver these high quality components on time, performance of an Operational Readiness Review (ORR) of these manufacturing activities is necessary. Energy Systems Policy GP 24 entitled "Operational Readiness Process" describes the formal and comprehensive process by which appropriate Energy Systems activities are to be reviewed to ensure their readiness. This Energy System policy is aimed at reducing the risks associated with mission success and requires a management approved "readiness plan" to be issued. This document is the readiness plan for the RTG materials production tasks.

  10. A Framework for the Cognitive Task Analysis in Systems Design

    DEFF Research Database (Denmark)

    Rasmussen, Jens

    he present rapid development of advanced information technology and its use for support of operators of complex technical systems are changing the content of task analysis towards the analysis of mental activities in decision making. Automation removes the humans from routine tasks, and operators...... are left with disturbance control and critical diagnostic tasks, for which computers are suitable for support, if it is possible to match the computer strategies and interface formats dynamically to the requirements of the current task by means of an analysis of the cognitive task....

  11. Integrated task plans for the Hanford Environmental Dose Reconstruction Project, June 1992 through May 1994

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1993-09-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to representative individuals. The primary objective of work to be performed through May 1994 is to determine the project's appropriate scope: space, time, radionuclides, pathways and representative individuals; determine the project's appropriate level of accuracy/level of uncertainty in dose estimates; complete model and data development; and estimate doses for the Hanford Thyroid Disease Study and representative individuals. A major objective of the HEDR Project is to estimate doses to the thyroid of individuals who were exposed to iodine-131. A principal pathway for many of these individuals was milk from cows that ate vegetation contaminated by iodine-131 released into the air from Hanford facilities. The plan for June 1992 through May 1994 has been prepared based on activities and budgets approved by the Technical Steering Panel (TSP) at its meetings on January 7--9, 1993 and February 25--26, 1993. The activities can be divided into three broad categories: (1) computer code and data development activities, (2) calculation of doses, and (3) technical and communication support to the TSP and the TSP Native American Working Group (NAWG). The following activities will be conducted to accomplish project objectives through May 1994

  12. Thoughts in flight: automation use and pilots' task-related and task-unrelated thought.

    Science.gov (United States)

    Casner, Stephen M; Schooler, Jonathan W

    2014-05-01

    The objective was to examine the relationship between cockpit automation use and task-related and task-unrelated thought among airline pilots. Studies find that cockpit automation can sometimes relieve pilots of tedious control tasks and afford them more time to think ahead. Paradoxically, automation has also been shown to lead to lesser awareness. These results prompt the question of what pilots think about while using automation. A total of 18 airline pilots flew a Boeing 747-400 simulator while we recorded which of two levels of automation they used. As they worked, pilots were verbally probed about what they were thinking. Pilots were asked to categorize their thoughts as pertaining to (a) a specific task at hand, (b) higher-level flight-related thoughts (e.g.,planning ahead), or (c) thoughts unrelated to the flight. Pilots' performance was also measured. Pilots reported a smaller percentage of task-at-hand thoughts (27% vs. 50%) and a greater percentage of higher-level flight-related thoughts (56% vs. 29%) when using the higher level of automation. However, when all was going according to plan, using either level of automation, pilots also reported a higher percentage of task-unrelated thoughts (21%) than they did when in the midst of an unsuccessful performance (7%). Task-unrelated thoughts peaked at 25% when pilots were not interacting with the automation. Although cockpit automation may provide pilots with more time to think, it may encourage pilots to reinvest only some of this mental free time in thinking flight-related thoughts. This research informs the design of human-automation systems that more meaningfully engage the human operator.

  13. Hybrid task priority-based motion control of a redundant free-floating space robot

    Directory of Open Access Journals (Sweden)

    Cheng ZHOU

    2017-12-01

    Full Text Available This paper presents a novel hybrid task priority-based motion planning algorithm of a space robot. The satellite attitude control task is defined as the primary task, while the least-squares-based non-strict task priority solution of the end-effector plus the multi-constraint task is viewed as the secondary task. Furthermore, a null-space task compensation strategy in the joint space is proposed to derive the combination of non-strict and strict task-priority motion planning, and this novel combination is termed hybrid task priority control. Thus, the secondary task is implemented in the primary task’s null-space. Besides, the transition of the state of multiple constraints between activeness and inactiveness will only influence the end-effector task without any effect on the primary task. A set of numerical experiments made in a real-time simulation system under Linux/RTAI shows the validity and feasibility of the proposed methodology. Keywords: Base attitude control, Hybrid task-priority, Motion planning, Multiple constraints, Redundant space robot

  14. Geothermal Energy and the Eastern US: Technical Information Interchange Meeting, Minutes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-12-01

    The technical interchange meeting documented here is the fourth meeting where people interested in geothermal energy in the Eastern US have met to interchange technical information. These meetings are intended to assist all in the difficult task of balancing time and effort in doing their assigned jobs and keeping track of what others are doing in similar or related tasks. All of the aforementioned meetings have served their intended purpose and further regional and national meetings are sure to follow.

  15. A Theory of Tax Avoidance - Managerial Incentives for Tax Planning in a Multi-Task Principal-Agent Model

    OpenAIRE

    Ewert, Ralf; Niemann, Rainer

    2014-01-01

    We derive determinants of tax avoidance by means of a multi-task principal-agent model. We extend prevailing models by integrating both corporate and individual income taxation as well as by including tax planning effort in the agent’s action portfolio. Our model shows novel and apparently paradoxical results regarding the impact of increased tax rates on efforts, risks, and incentive schemes. First, the principal’s after-tax profit can increase with a higher corporate tax rate. Second, t...

  16. Task Decomposition Module For Telerobot Trajectory Generation

    Science.gov (United States)

    Wavering, Albert J.; Lumia, Ron

    1988-10-01

    A major consideration in the design of trajectory generation software for a Flight Telerobotic Servicer (FTS) is that the FTS will be called upon to perform tasks which require a diverse range of manipulator behaviors and capabilities. In a hierarchical control system where tasks are decomposed into simpler and simpler subtasks, the task decomposition module which performs trajectory planning and execution should therefore be able to accommodate a wide range of algorithms. In some cases, it will be desirable to plan a trajectory for an entire motion before manipulator motion commences, as when optimizing over the entire trajectory. Many FTS motions, however, will be highly sensory-interactive, such as moving to attain a desired position relative to a non-stationary object whose position is periodically updated by a vision system. In this case, the time-varying nature of the trajectory may be handled either by frequent replanning using updated sensor information, or by using an algorithm which creates a less specific state-dependent plan that determines the manipulator path as the trajectory is executed (rather than a priori). This paper discusses a number of trajectory generation techniques from these categories and how they may be implemented in a task decompo-sition module of a hierarchical control system. The structure, function, and interfaces of the proposed trajectory gener-ation module are briefly described, followed by several examples of how different algorithms may be performed by the module. The proposed task decomposition module provides a logical structure for trajectory planning and execution, and supports a large number of published trajectory generation techniques.

  17. Technical oversight for installation of TNX piezometers, Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Pidcoe, W.W. Jr. [Westinghouse Savannah River Company, Aiken, SC (United States)

    1997-06-05

    Science Applications International Corporation was tasked under subcontract C002025P to provide technical oversight for the drilling of one pilot borehole, and the drilling and installation of five piezometers in the TNX Area Swamp. The work was performed in accordance with the Statement of Work in Task Order Proposal No. ER39-129 dated August 6, 1996. This report describes the activities associated with the performance of the task.

  18. An independent assessment of the technical feasibility of the Mars One mission plan - Updated analysis

    Science.gov (United States)

    Do, Sydney; Owens, Andrew; Ho, Koki; Schreiner, Samuel; de Weck, Olivier

    2016-03-01

    In recent years, the Mars One program has gained significant publicity for its plans to colonize the red planet. Beginning in 2025, the program plans to land four people on Mars every 26 months via a series of one-way missions, using exclusively existing technology. This one-way approach has frequently been cited as a key enabler of accelerating the first crewed landing on Mars. While the Mars One program has received considerable attention, little has been published in the technical literature regarding the formulation of its mission architecture. In light of this, we perform an independent analysis of the technical feasibility of the Mars One mission plan, focusing on the architecture of the life support and in-situ resource utilization (ISRU) systems, and their impact on sparing and space logistics. To perform this analysis, we adopt an iterative analysis approach in which we model and simulate the mission architecture, assess its feasibility, implement any applicable modifications while attempting to remain within the constraints set forth by Mars One, and then resimulate and reanalyze the revised version of the mission architecture. Where required information regarding the Mars One mission architecture is not available, we assume numerical values derived from standard spaceflight design handbooks and documents. Through four iterations of this process, our analysis finds that the Mars One mission plan, as publicly described, is not feasible. This conclusion is obtained from analyses based on mission assumptions derived from and constrained by statements made by Mars One, and is the result of the following findings: (1) several technologies including ISRU, life support, and entry, descent, and landing (EDL) are not currently "existing, validated and available" as claimed by Mars One; (2) the crop growth area described by Mars One is insufficient to feed their crew; (3) increasing the crop growth area to provide sufficient food for the crew leads to atmospheric

  19. Summary of Recommendations of the GBIF Task Group on the Global Strategy and Action Plan for the Digitisation of Natural History Collections

    Directory of Open Access Journals (Sweden)

    Walter G. Berendsohn

    2010-10-01

    Full Text Available The Global Biodiversity Information Facility’s Task Group has formulated three basic recommendations to the GBIF Governing Board in order to increase the rate of the digitization of natural history collections and improve the usage of this information resource: (i GBIF must facilitate access to information about non-digitized collection resources by publicizing the research potential of collections through metadata and assessing the number of non-digitized specimens; (ii GBIF must work with collections to continue to increase the efficiency of specimen data capture and to enhance data quality by means of technical measures, by means of ensuring attribution and professional credit and influencing institutional priorities, and by engaging with funding agencies; (iii GBIF must continue to improve and promote the global infrastructure used to mobilize digitized collection data through technical measures, outreach activities and political measures.

  20. JV Task 120 - Coal Ash Resources Research Consortium Research

    Energy Technology Data Exchange (ETDEWEB)

    Debra Pflughoeft-Hassett; Loreal Heebink; David Hassett; Bruce Dockter; Kurt Eylands; Tera Buckley; Erick Zacher

    2009-03-28

    The Coal Ash Resources Research Consortium{reg_sign} (CARRC{reg_sign}, pronounced 'cars') is the core coal combustion product (CCP) research group at the Energy & Environmental Research Center (EERC). CARRC focuses on performing fundamental and applied scientific and engineering research emphasizing the environmentally safe, economical use of CCPs. CARRC member organizations, which include utilities and marketers, are key to developing industry-driven research in the area of CCP utilization and ensuring its successful application. The U.S. Department of Energy is a partner in CARRC through the EERC Jointly Sponsored Research Program, which provides matching funds for industrial member contributions and facilitates an increased level of effort in CARRC. CARRC tasks were designed to provide information on CCP performance, including environmental performance, engineering performance, favorable economics, and improved life cycle of products and projects. CARRC technical research tasks are developed based on member input and prioritization. CARRC special projects are developed with members and nonmembers to provide similar information and to support activities, including the assembly and interpretation of data, support for standards development and technology transfer, and facilitating product development and testing. CARRC activities from 2007 to 2009 included a range of research tasks, with primary work performed in laboratory tasks developed to answer specific questions or evaluate important fundamental properties of CCPs. The tasks were included in four categories: (1) Environmental Evaluations of CCPs; (2) Evaluation of Impacts on CCPs from Emission Controls; (3) Construction and Product-Related Activities; and (4) Technology Transfer and Maintenance Tasks. All tasks are designed to work toward achieving the CARRC overall goal and supporting objectives. The various tasks are coordinated in order to provide broad and useful technical data for CARRC members

  1. 5D Task Analysis Visualization Tool, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The creation of a five-dimensional task analysis visualization (5D-TAV) software tool for Task Analysis and Workload Planning using multi-dimensional visualization...

  2. Manpower development for safe operation of nuclear power plant. China. Advice on maintenance planning. Activity: 3.1.2-Task-06. Technical report

    International Nuclear Information System (INIS)

    Chihara, Yasutaka; Imai, Kazuhide.

    1995-01-01

    Advice on maintenance planning for Qinshan nuclear power plant in China for their reference, based on the experience in Japan is presented. Specifically, the advice was given in the lecture and through the questions and answers, on such subjects as the establishment of a long-term plan, preparation of the work schedule, and the proper work management in relation to the periodic inspection and the routine check for the nuclear power facility. 1 tab

  3. Demonstration and evaluation of the CORPEX trademark Nuclear Decontamination Process, Technical task plan No. SR152005. Final Report

    International Nuclear Information System (INIS)

    May, C.G.

    1997-01-01

    In June, 1995, the Decontamination and Decommissioning Focus Area funded a demonstration of the CORPEX Nuclear Decontamination Process in an Old Metallography Laboratory glovebox at the Savannah River Site. The objective of the demonstration was to prove the effectiveness of a new and innovative technology that would reduce the risks associated with future cleanups of plutonium-238 contaminated equipment in the DOE complex. After facility and vendor preparations in support of the demonstration, Westinghouse Savannah River Company (WSRC) was informed by the vendor that the chemistry proposed for use in the decontamination process was not effective on sintered plutonium, which was the form of plutonium in the selected glovebox. After further technical evaluation, the demonstration was canceled. This report describes the work performed in support of the demonstration and the present status of the project. The CORPEX chemical process is a nondestructive cleaning method that removes only the contaminant and the matrix that fixed the contaminant to the surface. It does not damage the substrate. The cleaning agent is destroyed by the addition of proprietary oxidizers, leaving water, carbon dioxide and nitrogen gases, and a sludge as waste

  4. Making Planning Work

    DEFF Research Database (Denmark)

    Eibe Sørensen, Hans

    2018-01-01

    Planning for a growth opportunity's success remains a challenge. Under which conditions does planning work, then? This exploratory study investigates the business development tasks and processes that span a growth opportunity's planning phase and its implementation phase and their unique performa...

  5. Technical assistance contractor management plan: Surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC's mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel

  6. Technical assistance contractor management plan: Surface and ground water

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC`s mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel.

  7. Technical framework for groundwater restoration

    International Nuclear Information System (INIS)

    1991-04-01

    This document provides the technical framework for groundwater restoration under Phase II of the Uranium Mill Tailings Remedial Action (UMTRA) Project. A preliminary management plan for Phase II has been set forth in a companion document titled ''Preplanning Guidance Document for Groundwater Restoration''. General principles of site characterization for groundwater restoration, restoration methods, and treatment are discussed in this document to provide an overview of standard technical approaches to groundwater restoration

  8. Low Impact Development Master Plan

    Energy Technology Data Exchange (ETDEWEB)

    Loftin, Samuel R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-02

    This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.

  9. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    WEIR, W.R.

    2000-01-01

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  10. Configuration Management Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  11. Mapping Learning Outcomes and Assignment Tasks for SPIDER Activities

    Directory of Open Access Journals (Sweden)

    Lyn Brodie

    2011-05-01

    Full Text Available Modern engineering programs have to address rapidly changing technical content and have to enable students to develop transferable skills such as critical evaluation, communication skills and lifelong learning. This paper introduces a combined learning and assessment activity that provides students with opportunities to develop and practice their soft skills, but also extends their theoretical knowledge base. Key tasks included self directed inquiry, oral and written communication as well as peer assessment. To facilitate the SPIDER activities (Select, Prepare and Investigate, Discuss, Evaluate, Reflect, a software tool has been implemented in the learning management system Moodle. Evidence shows increased student engagement and better learning outcomes for both transferable as well as technical skills. The study focuses on generalising the relationship between learning outcomes and assignment tasks as well as activities that drive these tasks. Trail results inform the approach. Staff evaluations and their views of assignments and intended learning outcomes also supported this analysis.

  12. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: LabVIEW Real-Time (F) : 7 - 9.6.2005 (3 jours) LabVIEW Migration 6 to 7: 14.6.2005 (1 day) IT3T/1 - Read your mail and more with Outlook 2003 : 14.6.2005 (IT Technical Training Tutorial, free of charge) IT3T/2 - Creating, managing and using distribution lists with Simba2 : 16.6.2005 (IT Technical Training Tutorial, free of charge) FrontPage 2003 - niveau 2 : 16 & 17.6.2005 (2 jours) Utilisation de fichiers PDF avec ACROBAT 6.0 : 20.6.2005 (1journée) Introduction to ANSYS: 21 - 24.6.2005 (4 days) IT3T/3 - Working remotely with Windows XP : 28.6.2005 (IT Technical Training Tutorial, free of charge) IT3T/4 - Editing Websites with Frontpage 2003 : 30.6.2005 (IT Technical Training Tutorial, free of charge) WORD 2003 (Short Course I) - HowTo... Work with repetitive tasks /AutoText, AutoFormat, AutoC...

  13. Manpower development for safe operation of nuclear power plant. China. Revision of final safety analysis report. Activity: 5.1.3-Task-08. Technical report

    International Nuclear Information System (INIS)

    Almeida, C.; Elias, D.

    1994-01-01

    The objectives of this mission included providing assistance for the revision of the FSAR including: national practices, administrative procedures, required staffing level, other resources, planning, scheduling, content, and organization of the revision. Activities included several days of lectures regarding worldwide practices including the United States and Commonwealth Edison Company (ComEd), interaction with Chinese counterparts re. their FSAR and Technical Specification revision and two visits to the Qin Shan NPP

  14. ITER vacuum vessel fabrication plan and cost study (D 68) for the international thermonuclear experimental reactor

    International Nuclear Information System (INIS)

    1995-01-01

    ITER Task No. 8, Vacuum Vessel Fabrication Plan and Cost Study (D68), was initiated to assess ITER vacuum vessel fabrication, assembly, and cost. The industrial team of Raytheon Engineers ampersand Constructors and Chicago Bridge ampersand Iron (Raytheon/CB ampersand I) reviewed the current vessel basis and prepared a manufacturing plan, assembly plan, and cost estimate commensurate with the present design. The guidance for the Raytheon/CB ampersand I assessment activities was prepared by the ITER Garching Work Site. This guidance provided in the form of work descriptions, sketches, drawings, and costing guidelines for each of the presently identified vacuum vessel Work Breakdown Structure (WBS) elements was compiled in ITER Garching Joint Work Site Memo (Draft No. 9 - G 15 MD 01 94-17-05 W 1). A copy of this document is provided as Appendix 1 to this report. Additional information and clarifications required for the Raytheon/CB ampersand I assessments were coordinated through the US Home Team (USHT) and its technical representative. Design details considered essential to the Task 8 assessments but not available from the ITER Joint Central Team (JCT) were generated by Raytheon/CB ampersand I and documented accordingly

  15. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball

    Overview From a technical perspective, CMS has been in “beam operation” state since 6th November. The detector is fully closed with all components operational and the magnetic field is normally at the nominal 3.8T. The UXC cavern is normally closed with the radiation veto set. Access to UXC is now only possible during downtimes of LHC. Such accesses must be carefully planned, documented and carried out in agreement with CMS Technical Coordination, Experimental Area Management, LHC programme coordination and the CCC. Material flow in and out of UXC is now strictly controlled. Access to USC remains possible at any time, although, for safety reasons, it is necessary to register with the shift crew in the control room before going down.It is obligatory for all material leaving UXC to pass through the underground buffer zone for RP scanning, database entry and appropriate labeling for traceability. Technical coordination (notably Stephane Bally and Christoph Schaefer), the shift crew and run ...

  16. TECHNICAL DIAGNOSTICS AT RUP “BMZ”

    Directory of Open Access Journals (Sweden)

    A. A. Kuzembajev

    2004-01-01

    Full Text Available The review of technical diagnostics and crack detection at RUP “BMZ” is given in the article and there are reflected the functions and tasks of the Laboratory of Technical Diagnostics and Crack detection (LTDandC. The examples of determination of the equipment failure by methods of vibration diagnostics, applied in LTDandC, are given and the efficiency of using of the system of technical servicing of the equipment according to “state” is shown. The idea of transfer from the repairs system “according to schedule” to repairs “according to state” using new information technologies such as vibrating monitoring and vibrating diagnostics is briefly reflected in the article.

  17. The Method of Multiple Spatial Planning Basic Map

    Science.gov (United States)

    Zhang, C.; Fang, C.

    2018-04-01

    The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.

  18. Technical writing practically unified through industry

    Science.gov (United States)

    Houston, L. S.

    1981-01-01

    General background details in the development of a university level technical writing program, based upon the writing tasks of the student's occupations, are summarized. Objectives and methods for unifying the courses of study with the needs of industry are discussed. Four academic course divisions, Industries Technologies, in which preparation and training are offered are: Animal, Horticulture, Agriculture, and Agricultural Business. Occupational competence is cited as the main goal for these programs in which technical writing is to be practically unified through industry. Course descriptions are also provided.

  19. Improvements to Technical Specifications surveillance requirements

    International Nuclear Information System (INIS)

    Lobel, R.; Tjader, T.R.

    1992-12-01

    In August 1983 an NRC task group was formed to investigate problems with surveillance testing required by Technical Specifications, and to recommend approaches to effect improvements. NUREG-1024 (''Technical Specifications-Enhancing Safety Impact'') resulted, and it contained recommendations to review the basis for test frequencies; to ensure that the tests promote safety and do not degrade equipment; and to review surveillance tests so that they do not unnecessarily burden personnel. The Technical Specifications Improvement Program (TSIP) was established in December 1984 to provide the framework for rewriting and improving the Technical Specifications. As an element of the TSIP, all Technical Specifications surveillance requirements were comprehensively examined as recommended in NUREG-1024. The results of that effort are presented in this report. The study found that while some testing at power is essential to verify equipment and system operability, safety can be improved, equipment degradation decreased, and unnecessary personnel burden relaxed by reducing the amount of testing at power

  20. Louisiana ITS business plan : technical summary.

    Science.gov (United States)

    2000-03-01

    The objectives are defined under: 1. Development of the plan, which identifies the preferred program of projects and policy initiatives and outlines the purpose, requirements, responsibilities, estimated cost, and implementation schedule for each pla...

  1. Robot Plans and Human Plans: Implications for Models of Communication. Technical Report No. 314.

    Science.gov (United States)

    Bruce, Bertram

    People in interaction with others organize their perceptions of a social situation in terms of plans even when the others' plans are poorly formulated. They use their models of others' plans in formulating their own. Much of what occurs in discourse centers on a continual communication about and reformulation of one's own plans and one's own…

  2. Geothermal Energy and the Eastern US: Fifth technical information interchange meeting, Minutes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-01

    The technical interchange meeting documented here is the fifth meeting where people interested in geothermal energy in the Eastern US have met to interchange technical information. These meetings are intended to assist all in the difficult task of balancing time and effort in doing their assigned jobs and keeping track of what others are doing in similar or related tasks. All of the aforementioned meetings have served their intended purpose and further regional and national meetings are sure to follow.

  3. Teaching audience analysis to the technical student

    Science.gov (United States)

    Debs, M. B.; Brillhart, L. V.

    1981-01-01

    Teaching audience analysis, as practiced in a technical writing course for engineering students, is discussed. Audience analysis is described as the task of defining the audience for a particular piece of writing and determining those characteristics of the audience which constrain the writer and effect reception of the message. A mature technical writing style that shows the tension produced when a text is written to be read and understood is considered in terms of audience analysis. Techniques include: (1) conveying to students the concept that a reader with certain expectations exist, (2) team teaching to preserve the context of a given technical discipline, and (3) assigning a technical report that addresses a variety of readers, thus establishing the complexity of audience oriented writing.

  4. IFMIF-CDA technical workshop on lithium target system. Proceedings

    International Nuclear Information System (INIS)

    1995-09-01

    An intense neutron source, International Fusion Materials Irradiation Facility (IFMIF) is planned under the collaborative program by International Energy Agency (IEA), and the Conceptual Design Activity (CDA) started in February 1995. US, Japan and EU are responsible to take a lead in coordinating accelerator, target and test cell design, respectively. In order to exchange the current results of the study and to coordinate the activities for the design integration, the first technical workshop on the lithium target system was held in the period of July 18-21 at the Tokai Research Establishment of the JAERI. This publication summarizes the materials presented in this meeting. The presentations and discussions were organized with the identified CDA tasks. It was confirmed that the reference design of the IFMIF target based on the previous studies under FMIT and ESNIT, elaborated to meet IFMIF parameters, is reasonable and feasible. It was pointed out that the interface between accelerator and test cell subsystems should be carefully investigated to avoid technical conflicts. Some design options such as nozzle, backwall and lithium jet geometry, lithium purity control, and lithium vapor control, based on the current technology were proposed to improve the integral target system function, and further R and D studies were suggested for design integration. (author)

  5. Some technical writing skills industry needs

    Science.gov (United States)

    Smith, F. R.

    1981-01-01

    It is suggested that engineers and other technical students be taught three classes of skills in technical writing. First, "Big Picture Things", which includes: the importance of clear writing, the wide scope of writing, the wide scope of writing tasks that will be faced in industry, and the principles of organization of technical materials such as; how to analyze, classify, partition, and interpret. Second, "Writing Procedures", which encompasses: how to get words on paper efficiently and team-write. Third, "Writing Details", in which two considerations are important: how to achieve precision in the use of language and the aspects of style. Three problems in style are cited: the problem of sentence transition, overuse of attributive adjectives, and verbosity in paragraph structure. The most important thing in technical writing is considered to be functionality, economy and clarity.

  6. How to develop and write a case for technical writing

    Science.gov (United States)

    Couture, B.; Goldstein, J.

    1981-01-01

    Case of different sizes and shapes for teaching technical writing to engineers at Wayne State University have been developed. The case approach was adopted for some assignments because sophomores and juniors lacked technical expertise and professional knowledge of the engineering world. Cases were found to be good exercises, providing realistic practice in specific writing tasks or isolating particular skills in the composing process. A special kind of case which narrates the experiences of one technical person engaged in the problem-solving process in a professional rhetorical situation was developed. This type of long, realistic fiction is called a an "holistic" case. Rather than asking students to role-play a character, an holistic case realistically encompasses the whole of the technical writing process. It allows students to experience the total communication act in which the technical task and data are fully integrated into the rhetorical situation and gives an opportunity to perform in a realistic context, using skills and knowledge required in communication on the job. It is believed that the holistic case most fully exploits the advantages of the case method for students of professional communication.

  7. Paramedics' non-technical skills: a literature review.

    Science.gov (United States)

    Shields, Allan; Flin, Rhona

    2013-05-01

    Healthcare organisations have started to examine the impact that the human worker has on patient safety. Adopting the Crew Resource Management (CRM) approach, used in aviation, the CRM or non-technical skills of anaesthetists, surgeons, scrub practitioners and emergency physicians have recently been identified to assist in their training and assessment. Paramedics are exposed to dynamic and dangerous situations where patients have to be managed, often with life-threatening injuries or illness. As in other safety-critical domains, the technical skills of paramedics are complemented by effective non-technical skills. The aim of this paper was to review the literature on the non-technical (social and cognitive) skills used by paramedics. This review was undertaken as part of a task analysis to identify the non-technical skills used by paramedics. Of the seven papers reviewed, the results have shown very little research on this topic and so reveal a gap in the understanding of paramedic non-technical skills.

  8. Geospace Plasma Dynamics Laboratory Annual Task Report (FY11)

    Science.gov (United States)

    2012-03-01

    Site Contractors: Nagendra Singh, Ph.D., Physicist , 0.5 MY Neil Grossbard, M.S., Mathematician , 0.7 MY Visitors: Publications: Articles in...PhD Project Manager Division Chief, RVB This report is published in the interest of scientific and technical...Annual Task Report (FY11) 5c. PROGRAM ELEMENT NUMBER 61102F 6. AUTHOR(S) 5d. PROJECT NUMBER 2311 Daniel Ober 5e. TASK NUMBER

  9. Simulation-based ureteroscopy skills training curriculum with integration of technical and non-technical skills: a randomised controlled trial.

    Science.gov (United States)

    Brunckhorst, Oliver; Shahid, Shahab; Aydin, Abdullatif; McIlhenny, Craig; Khan, Shahid; Raza, Syed Johar; Sahai, Arun; Brewin, James; Bello, Fernando; Kneebone, Roger; Khan, Muhammad Shamim; Dasgupta, Prokar; Ahmed, Kamran

    2015-09-01

    Current training modalities within ureteroscopy have been extensively validated and must now be integrated within a comprehensive curriculum. Additionally, non-technical skills often cause surgical error and little research has been conducted to combine this with technical skills teaching. This study therefore aimed to develop and validate a curriculum for semi-rigid ureteroscopy, integrating both technical and non-technical skills teaching within the programme. Delphi methodology was utilised for curriculum development and content validation, with a randomised trial then conducted (n = 32) for curriculum evaluation. The developed curriculum consisted of four modules; initially developing basic technical skills and subsequently integrating non-technical skills teaching. Sixteen participants underwent the simulation-based curriculum and were subsequently assessed, together with the control cohort (n = 16) within a full immersion environment. Both technical (Time to completion, OSATS and a task specific checklist) and non-technical (NOTSS) outcome measures were recorded with parametric and non-parametric analyses used depending on the distribution of our data as evaluated by a Shapiro-Wilk test. Improvements within the intervention cohort demonstrated educational value across all technical and non-technical parameters recorded, including time to completion (p technical and non-technical skills teaching is both educationally valuable and feasible. Additionally, the curriculum offers a validated simulation-based training modality within ureteroscopy and a framework for the development of other simulation-based programmes.

  10. Tribal Colleges and Universities/American Indian Research and Education Initiatives Advanced Manufacturing Technical Assistance Project

    Energy Technology Data Exchange (ETDEWEB)

    Atcitty, Stanley [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-02-01

    The overall goal of this project is to establish a network of TCUs with essential advanced manufacturing (AM) facilities, associated training and education programs, and private sector and federal agency partnerships to both prepare an American Indian AM workforce and create economic and employment opportunities within Tribal communities through design, manufacturing, and marketing of high quality products. Some examples of high quality products involve next generation grid components such as mechanical energy storage, cabling for distribution of energy, and electrochemical energy storage enclosures. Sandia National Laboratories (Sandia) is tasked to provide technical advising, planning, and academic program development support for the TCU/American Indian Higher Education Consortium (AIHEC) Advanced Manufacturing Project. The TCUs include Bay Mills Community College (BMCC), Cankdeska Cikana Community College (CCCC), Navajo Technical University (NTU), Southwestern Indian Polytechnic Institute (SIPI), and Salish Kooteani College. AIHEC and Sandia, with collaboration from SIPI, will be establishing an 8-week summer institute on the SIPI campus during the summer of 2017. Up to 20 students from TCUs are anticipated to take part in the summer program. The goal of the program is to bring AM science, technology, engineering, and mathematics (STEM) awareness and opportunities for the American Indian students. Prior to the summer institute, Sandia will be providing reviews on curriculum plans at the each of the TCUs to ensure the content is consistent with current AM design and engineering practice. In addition, Sandia will provide technical assistance to each of the TCUs in regards to their current AM activities.

  11. Three Mile Island accident technical support

    International Nuclear Information System (INIS)

    Long, R.L.; Crimmins, T.M.; Lowe, W.W.

    1981-01-01

    A large number of technical support personnel were required to respond to the Three Mile Island Unit 2 (TMI-2) accident of March 28, 1979. Under the leadership of General Public Utilities personnel, onsite (round-the-clock shift) technical support began the evening of March 29 and within a week the TMI Recovery Organization incorporated all of the essential technical capability to implement the Base Plan for Cooldown, manage the radioactive waste problem, and begin the steps toward long-range plant recovery. These steps toward recovery are described in some detail. 1 refs

  12. Environment, safety, and health regulatory implementation plan

    International Nuclear Information System (INIS)

    1993-01-01

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project's environment, safety, and health (ES ampersand H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project's regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES ampersand H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status

  13. OSH technical reference manual

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    In an evaluation of the Department of Energy (DOE) Occupational Safety and Health programs for government-owned contractor-operated (GOCO) activities, the Department of Labor`s Occupational Safety and Health Administration (OSHA) recommended a technical information exchange program. The intent was to share written safety and health programs, plans, training manuals, and materials within the entire DOE community. The OSH Technical Reference (OTR) helps support the secretary`s response to the OSHA finding by providing a one-stop resource and referral for technical information that relates to safe operations and practice. It also serves as a technical information exchange tool to reference DOE-wide materials pertinent to specific safety topics and, with some modification, as a training aid. The OTR bridges the gap between general safety documents and very specific requirements documents. It is tailored to the DOE community and incorporates DOE field experience.

  14. The socio-technical system and nuclear safety

    International Nuclear Information System (INIS)

    Stefanescu, Petre; Mihailescu, Nicolae; Dragusin, Octavian

    1999-01-01

    In the field of nuclear safety there have been defined notions like 'technical factors' and 'human factors'. The technical factors depend on designing and manufacturing of components/equipment, actually depend on the people's work. The study of human factors consists in analyzing and recommending the terms that allow an individual to be a reliable and safety agent. Accordingly, he/she is placed in working conditions corresponding to human abilities, associating the means of three levels: - designing, i.e. the action upon the technical system and upon work organization; - correction, i.e. the action upon the evolution of the technical system and organizing; - formation/training, i.e. action upon operators. The paper presents a characterization of the socio-technical system and on this basis discusses the issue of individual adjustment to the socio-technical system and reciprocally, the issue of the socio-technical system adjustment to the individual. Concepts as: ergonomics, physical medium, man/machine interface and support of the operator, man/machine task sharing, the work organizing are put in relation with the central subject, the nuclear safety

  15. Technical Assessment Of Selection Of A Waste Disposal Site

    International Nuclear Information System (INIS)

    Lee, Bong Hun

    1992-04-01

    This book gives overall descriptions of technical assessment of selection of a waste disposal site, which deals with standard of selection on incinerator of city waste, the method over assessment of selection of incinerator in city waste, prerequisite of technical assessment for selection of incinerator, waste incinerator and related equipment such as form, structure, quality of material, ventilation device, plumbing system and electrical installation, and total plan like plan of construction and a measure taken against environmental pollution.

  16. THE METHOD OF MULTIPLE SPATIAL PLANNING BASIC MAP

    Directory of Open Access Journals (Sweden)

    C. Zhang

    2018-04-01

    Full Text Available The “Provincial Space Plan Pilot Program” issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve “multi-compliance” of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.

  17. Efforts - Final technical report on task 4. Physical modelling calidation

    DEFF Research Database (Denmark)

    Andreasen, Jan Lasson; Olsson, David Dam; Christensen, T. W.

    The present report is documentation for the work carried out in Task 4 at DTU Physical modelling-validation on the Brite/Euram project No. BE96-3340, contract No. BRPR-CT97-0398, with the title Enhanced Framework for forging design using reliable three-dimensional simulation (EFFORTS). The report...

  18. Effects of ethnic attributes on the quality of family planning services in Lima, Peru: a randomized crossover trial.

    Directory of Open Access Journals (Sweden)

    Maria-Elena Planas

    Full Text Available Most studies reporting ethnic disparities in the quality of healthcare come from developed countries and rely on observational methods. We conducted the first experimental study to evaluate whether health providers in Peru provide differential quality of care for family planning services, based on the indigenous or mestizo (mixed ethnoracial ancestry profile of the patient. In a crossover randomized controlled trial conducted in 2012, a sample of 351 out of the 408 public health establishments in Metropolitan Lima, Peru were randomly assigned to receive unannounced simulated patients enacting indigenous and mestizo profiles (sequence-1 or mestizo and then indigenous profiles (sequence-2, with a five week wash-out period. Both ethnic profiles used the same scripted scenario for seeking contraceptive advice but had distinctive cultural attributes such as clothing, styling of hair, make-up, accessories, posture and patterns of movement and speech. Our primary outcome measure of quality of care is the proportion of technical tasks performed by providers, as established by Peruvian family planning clinical guidelines. Providers and data analysts were kept blinded to the allocation. We found a non-significant mean difference of -0.7% (p = 0.23 between ethnic profiles in the percentage of technical tasks performed by providers. However we report large deficiencies in the compliance with quality standards of care for both profiles. Differential provider behaviour based on the patient's ethnic profiles compared in the study did not contribute to deficiencies in family planning outcomes observed. The study highlights the need to explore other determinants for poor compliance with quality standards, including demand and supply side factors, and calls for interventions to improve the quality of care for family planning services in Metropolitan Lima.

  19. Dealing with Prospective Memory Demands While Performing an Ongoing Task: Shared Processing, Increased On-Task Focus, or Both?

    Science.gov (United States)

    Rummel, Jan; Smeekens, Bridget A.; Kane, Michael J.

    2017-01-01

    Prospective memory (PM) is the cognitive ability to remember to fulfill intended action plans at the appropriate future moment. Current theories assume that PM fulfillment draws on attentional processes. Accordingly, pending PM intentions interfere with other ongoing tasks to the extent to which both tasks rely on the same processes. How do people…

  20. Technical guide to criticality alarm system design

    International Nuclear Information System (INIS)

    Greenfield, B.

    2009-01-01

    An instructional manual was created to guide criticality safety engineers through the technical aspects of designing a criticality alarm system (CAS) for Dept. of Energy (DOE) hazard class 1 and 2 facilities. The manual was structured such that it can be used by engineers designing completely new systems and by those who are working with existing facilities. Major design tasks are thoroughly analyzed to provide concise direction for how to complete the analysis. Regulatory and technical performance requirements were both addressed. (authors)

  1. Technical Paper on Physical Planning and Monitoring Tools

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    and maintenance of such buildings.    Further, the paper outlines a number of physical planning and building tools to guide future planning and design development, and it suggests a range of action-oriented operational evaluation studies in order to improve the physical learning environment....

  2. System-Cost-Optimized Smart EVSE for Residential Application: Final Technical Report including Manufacturing Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Charles [Delta Products, Triangle Park, NC (United States)

    2015-05-15

    In the 2nd quarter of 2012, a program was formally initiated at Delta Products to develop smart-grid-enabled Electric Vehicle Supply Equipment (EVSE) product for residential use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE-OE0000590. Delta products was the prime contractor to DOE during the three year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Detroit Edison DTE, Mercedes Benz Research and Development North America, and kVA. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of an EVSE prototype system is described in detail, culminating in prototypes shipped to Department of Energy Laboratories for final qualification. After the program history is reviewed, the key attributes of the resulting EVSE are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this EVSE to meet or exceed DOE's targets for this program, including: construction of a working product-intent prototype of a smart-grid-enabled EVSE, with suitable connectivity to grid management and home-energy management systems, revenue-grade metering, and related technical functions; and cost reduction of 50% or more compared to typical market priced EVSEs at the time of DOE's funding opportunity announcement (FOA), which was released in mid 2011. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical

  3. Linear Temporal Logic-based Mission Planning

    Directory of Open Access Journals (Sweden)

    Anil Kumar

    2016-06-01

    Full Text Available In this paper, we describe the Linear Temporal Logic-based reactive motion planning. We address the problem of motion planning for mobile robots, wherein the goal specification of planning is given in complex environments. The desired task specification may consist of complex behaviors of the robot, including specifications for environment constraints, need of task optimality, obstacle avoidance, rescue specifications, surveillance specifications, safety specifications, etc. We use Linear Temporal Logic to give a representation for such complex task specification and constraints. The specifications are used by a verification engine to judge the feasibility and suitability of plans. The planner gives a motion strategy as output. Finally a controller is used to generate the desired trajectory to achieve such a goal. The approach is tested using simulations on the LTLMoP mission planning tool, operating over the Robot Operating System. Simulation results generated using high level planners and low level controllers work simultaneously for mission planning and controlling the physical behavior of the robot.

  4. Alternative methods for disposal of low-level radioactive wastes. Task 2c: technical requirements for earth mounded concrete bunker disposal of low-level radioactive waste. Volume 4

    International Nuclear Information System (INIS)

    Miller, W.O.; Bennett, R.D.

    1985-10-01

    The study reported herein contains the results of Task 2c (Technical Requirements for Earth Mounded Concrete Bunker Disposal of Low-Level Radioactive Waste) of a four-task study entitled ''Criteria for Evaluating Engineered Facilities''. The overall objective of this study is to ensure that the criteria needed to evaluate five alternative low-level radioactive waste (LLW) disposal methods are available to potential license applicants. The earth mounded concrete bunker disposal alternative is one of several methods that may be proposed for disposal of low-level radioactive waste. The name of this alternative is descriptive of the disposal method used in France at the Centre de la Manche. Experience gained with this method at the Centre is described, including unit operations and features and components. Some improvements to the French system are recommended herein, including the use of previous backfill around monoliths and extending the limits of a low permeability surface layer. The applicability of existing criteria developed for near-surface disposal (10 CFR Part 61 Subpart D) to the earth mounded concrete bunker disposal method, as assessed in Task 1, are reassessed herein. With minor qualifications, these criteria were found to be applicable in the reassessment. These conclusions differ slightly from the Task 1 findings

  5. Linear Temporal Logic-based Mission Planning

    OpenAIRE

    Anil Kumar; Rahul Kala

    2016-01-01

    In this paper, we describe the Linear Temporal Logic-based reactive motion planning. We address the problem of motion planning for mobile robots, wherein the goal specification of planning is given in complex environments. The desired task specification may consist of complex behaviors of the robot, including specifications for environment constraints, need of task optimality, obstacle avoidance, rescue specifications, surveillance specifications, safety specifications, etc. We use Linear Tem...

  6. External plans for radiological emergency

    International Nuclear Information System (INIS)

    Suarez, G.; Vizuet G, J.; Benitez S, J.A.

    1999-01-01

    Since 1989, the National Institute of Nuclear Research in Mexico shares in the task of Food and Water Control corresponding to the FT-86 task force of External Plans for Radiological Emergency (PERE), in charge of the Veracruz Health Services. In the PERE preparation stage previous actions are necessary developed for the preparation and updating of this plan and the task organization with the purpose to maintaining standing and operable in any time and circumstance, the capability to response in the face of an emergency. This stage englobes activities which must be realized before to carry out the Plan as they are the specialized training of personnel which participates and the execution of exercises and simulacrums. Until 1998, training and exercises for this task had been realized under diverse possible sceneries but in conditions that simulated the presence of radioactive material. For this reason, it should be emphasized the training realized during the days 6th, 7th, 8th July, 1999, in the emergency planning zone of the Plan, which to carry out using radioactive material. The National Institute of Nuclear Research had in charge of the training. This work describes all the activities for the realization of this training. (Author)

  7. Sustainability and deliberate transition of socio-technical systems

    DEFF Research Database (Denmark)

    Hansen, Ole Erik; Søndergård, Bent; Stærdahl, Jens

    or developing socio-technical systems in order to integrate the concept of sustainability as a driver for the deliberate and purposeful shaping and transition. The article discusses the requirements to effective governance networks and governing of governance networks. Research within innovation systems......The article suggests that deliberate planning for sustainability demands a focus on the transition of socio-technical systems in order to establish robust and more sustainable patterns of production and consumption. This implies the necessity of a new perspective for environmental planning......, transition management and technology systems combined with planning and experimental activities provides both a theoretical and empirical body of knowledge of such governance processes. The article discusses how this perspective can be used in relation to the process of developing bio-fuel systems...

  8. Analytical Plans Supporting The Sludge Batch 8 Glass Variability Study Being Conducted By Energysolutions And CUA's Vitreous State Laboratory

    International Nuclear Information System (INIS)

    Edwards, T. B.; Peeler, D. K.

    2012-01-01

    EnergySolutions (ES) and its partner, the Vitreous State Laboratory (VSL) of The Catholic University of America (CUA), are to provide engineering and technical services support to Savannah River Remediation, LLC (SRR) for ongoing operation of the Defense Waste Processing Facility (DWPF) flowsheet as well as for modifications to improve overall plant performance. SRR has requested via a statement of work that ES/VSL conduct a glass variability study (VS) for Sludge Batch 8. SRR issued a technical task request (TTR) asking that the Savannah River National Laboratory (SRNL) provide planning and data reduction support for the ES/VSL effort. This document provides two analytical plans for use by ES/VSL: one plan is to guide the measurement of the chemical composition of the study glasses while the second is to guide the measurement of the durability of the study glasses. The measurements generated by ES/VSL are to be provided to SRNL for data reduction and evaluation. SRNL is to review the results of its evaluation with ES/VSL and SRR. The results will subsequently be incorporated into a joint report with ES/VSL as a deliverable to SRR to support the processing of SB8 at DWPF

  9. Japanese professional nurses spend unnecessarily long time doing nursing assistants' tasks.

    Science.gov (United States)

    Kudo, Yasushi; Yoshimura, Emiko; Shahzad, Machiko Taruzuka; Shibuya, Akitaka; Aizawa, Yoshiharu

    2012-09-01

    In environments in which professional nurses do simple tasks, e.g., laundry, cleaning, and waste disposal, they cannot concentrate on technical jobs by utilizing their expertise to its fullest benefit. Particularly, in Japan, the nursing shortage is a serious problem. If professional nurses take their time to do any of these simple tasks, the tasks should be preferentially allocated to nursing assistants. Because there has been no descriptive study to investigate the amount of time Japanese professional nurses spent doing such simple tasks during their working time, their actual conditions remain unclear. Professional nurses recorded their total working time and the time they spent doing such simple tasks during the week of the survey period. The time an individual respondent spent doing one or more simple tasks during that week was summed up, as was their working time. Subsequently, the percentage of the summed time he or she spent doing any of those tasks in his or her summed working time was calculated. A total of 1,086 respondents in 19 hospitals that had 87 to 376 beds were analyzed (response rate: 53.3%). The average time (SD) that respondents spent doing those simple tasks and their total working time were 2.24 (3.35) hours and 37.48 (10.88) hours, respectively. The average percentage (SD) of the time they spent doing the simple tasks in their working time was 6.00% (8.39). Hospital administrators must decrease this percentage. Proper working environments in which professional nurses can concentrate more on their technical jobs must be created.

  10. Engineering task plan for upgrades to the leveling jacks on core sample trucks number 3 and 4; TOPICAL

    International Nuclear Information System (INIS)

    KOSTELNIK, A.J.

    1999-01-01

    Characterizing the waste in underground storage tanks at the Hanford Site is accomplished by obtaining a representative core sample for analysis. Core sampling is one of the numerous techniques that have been developed for use given the environmental and field conditions at the Hanford Site. Core sampling is currently accomplished using either Push Mode Core Sample Truck No.1 or; Rotary Mode Core Sample Trucks No.2, 3 or 4. Past analysis (WHC 1994) has indicated that the Core Sample Truck (CST) leveling jacks are structurally inadequate when lateral loads are applied. WHC 1994 identifies many areas where failure could occur. All these failures are based on exceeding the allowable stresses listed in the American Institute of Steel Construction (AISC) code. The mode of failure is for the outrigger attachments to the truck frame to fail resulting in dropping of the CST and possible overturning (Ref. Ziada and Hundal, 1996). Out of level deployment of the truck can exceed the code allowable stresses in the structure. Calculations have been performed to establish limits for maintaining the truck level when lifting. The calculations and the associated limits are included in appendix A. The need for future operations of the CSTS is limited. Sampling is expected to be complete in FY-2001. Since there is limited time at risk for continued use of the CSTS with the leveling controls without correcting the structural problems, there are several design changes that could give incremental improvements to the operational safety of the CSTS with limited impact on available operating time. The improvements focus on making the truck easier to control during lifting and leveling. Not all of the tasks identified in this ETP need to be performed. Each task alone can improve the safety. This engineering task plan is the management plan document for implementing the necessary additional structural analysis. Any additional changes to meet requirements of standing orders shall require a

  11. Software Engineering Improvement Plan

    Science.gov (United States)

    2006-01-01

    In performance of this task order, bd Systems personnel provided support to the Flight Software Branch and the Software Working Group through multiple tasks related to software engineering improvement and to activities of the independent Technical Authority (iTA) Discipline Technical Warrant Holder (DTWH) for software engineering. To ensure that the products, comments, and recommendations complied with customer requirements and the statement of work, bd Systems personnel maintained close coordination with the customer. These personnel performed work in areas such as update of agency requirements and directives database, software effort estimation, software problem reports, a web-based process asset library, miscellaneous documentation review, software system requirements, issue tracking software survey, systems engineering NPR, and project-related reviews. This report contains a summary of the work performed and the accomplishments in each of these areas.

  12. Complexity Results in Epistemic Planning

    DEFF Research Database (Denmark)

    Bolander, Thomas; Jensen, Martin Holm; Schwarzentruber, Francois

    2015-01-01

    Epistemic planning is a very expressive framework that extends automated planning by the incorporation of dynamic epistemic logic (DEL). We provide complexity results on the plan existence problem for multi-agent planning tasks, focusing on purely epistemic actions with propositional preconditions...

  13. Advanced Transportation System Studies. Technical Area 3: Alternate Propulsion Subsystems Concepts. Volume 3; Program Cost Estimates

    Science.gov (United States)

    Levack, Daniel J. H.

    2000-01-01

    The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F- IA Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results , and the program cost estimates are described in more detail in Volume I - Executive Summary and in individual Final Task Reports.

  14. Spatial Visualization ability improves with and without studying Technical Drawing.

    Science.gov (United States)

    Contreras, María José; Escrig, Rebeca; Prieto, Gerardo; Elosúa, M Rosa

    2018-03-27

    The results of several studies suggest that spatial ability can be improved through direct training with tasks similar to those integrated in the tests used to measure the ability. However, there is a greater interest in analyzing the effectiveness of indirect training such as games or of learning subjects that involve spatial processes to a certain extent. Thus, the objective of the present study was to analyze whether the indirect training in Technical Drawing improved the Spatial Visualization ability of Architecture students. For this purpose, a group of students enrolled in Fundamentals of Architecture were administered two tests, a Spatial Visualization task and an Abstract Reasoning task, at the beginning and the end of a semester, after having received training through the subjects "Technical Drawing I: Geometry and Perception" and "Projects I." The results of this group were compared with those of a control group of students enrolled in a Mathematics degree, who were also pre-post evaluated but had not received the training in Technical Drawing. The study showed a significant pre-post improvement in both, Visualization and reasoning. However, this improvement occurred in both groups, thereby concluding that this improvement was not due to indirect training. Furthermore, no significant differences were found between men and women in any of the groups or conditions. These results clarify those of an earlier study where improvement in Visualization after training in Technical Drawing was found but did not include a comparison with a control condition. The control condition has proved to be important in order to consider the limitations of the effect of Technical Drawing on said improvement.

  15. 1994 DOE Technical Standards Program Workshop: Proceedings

    International Nuclear Information System (INIS)

    Spellman, D.J.

    1994-01-01

    The DOE Technical Standards Program has been structured to provide guidance and assistance for the development, adoption, and use of voluntary standards within the Department. OMB Circular A-119, ''Federal Participation in the Development and Use of Voluntary Standards'' establishes the policy to be followed in working with voluntary standards bodies, and in adopting and using voluntary standards whenever feasible. The DOE Technical Standards Program is consistent with this policy and is dedicated to the task of promoting its implementation. The theme of this year's workshop is ''Standards Initiatives in Environmental Management fostering the development and use of industry standards for safe, environmentally responsible operations.'' The objective of the workshop is to increase the participant's awareness of the standardization activities taking place nationally and internationally and the impact of these activities on their efforts, and to facilitate the exchange of experiences, processes, and tools for implementing the program. Workshop sessions will include presentations by industry and Government notables in the environment, safety, and health arena with ample opportunity for everyone to ask questions and share experiences. There will be a breakout session which will concentrate on resolution of issues arising from the implementation of the DOE Technical Standards Program and a plenary session to discuss the plans developed by the breakout groups. Many organizations provide services and products which support the development, processing, distribution, and retrieval of standards. Those organizations listed at the end of the agenda will have exhibits available for your perusal throughout the workshop. Last year's workshop was very successful in stimulating an understanding of an interest in the standards program. This year, we hope to build on that success and provide an environment for the synergism of ideas to enhance the program and advance its implementation

  16. The ground based plan

    International Nuclear Information System (INIS)

    1989-01-01

    The paper presents a report of ''The Ground Based Plan'' of the United Kingdom Science and Engineering Research Council. The ground based plan is a plan for research in astronomy and planetary science by ground based techniques. The contents of the report contains a description of:- the scientific objectives and technical requirements (the basis for the Plan), the present organisation and funding for the ground based programme, the Plan, the main scientific features and the further objectives of the Plan. (U.K.)

  17. Strategic plan for the development of IAEA safeguards equipment

    International Nuclear Information System (INIS)

    Khlebnikov, N.

    2001-01-01

    Full text: The need for a top-down Safeguards Strategy to focus departmental objectives was recognized by the Programme Performance Appraisal System (PPAS) performed on the Equipment Development Project in 1999. The Department of Safeguards prepared at the end of 2000 a 5-year Strategic Plan to identify the changes and improvements expected to take place over the 2001-2005 period. Those Strategic Objectives were supposed to be used to properly plan IAEA Safeguards activities and define appropriate and coherent R and D programmes. The present paper describes the strategic directions that the IAEA will follow in the area of equipment development in order to meet the Safeguards Department long-term objectives for 2001-2005. The paper, which is derived from the IAEA Strategic Equipment Development Plan, prepared by the Division of Technical Support, includes two parts: general principles and policies applicable to all equipment development tasks; specific strategic guidance. The paper will not describe the detailed plans which are prepared based on the strategic plan on a biannual basis. Equipment development activities have been divided in five major projects (NDA, Seals, Surveillance, Unattended Monitoring and Remote Monitoring). Strategic directions for each of these projects will be described in the paper. Separate sections will deal with equipment development strategic guidance in the area of additional protocol inspections, JNFL projects, illicit trafficking and Trilateral Initiative. (author)

  18. The southern Hessen waste management task force - initial situation, objectives, state of development; Suedhessische Arbeitsgemeinschaft Abfallwirtschaft - Ausgangssituation, Zielsetzung und Entwicklungsstand

    Energy Technology Data Exchange (ETDEWEB)

    Braun, H.J. [Stadt Darmstadt (Germany)

    1998-12-31

    In 1994, the rural districts of Darmstadt-Dieburg, Bergstrasse, Odenwald and Gross-Gerau in southern Hessen and the town of Darmstadt concluded a cooperation agreement permitting them to meet the future demands of the technical code on municipal waste and the `Kreislaufwirtschafts- und Abfallgesetz` (act concerning waste recycling and waste management). In order to formally prepare different forms of cooperation and to accompany corresponding preliminary investigations, the Suedhessische Arbeitsgemeinschaft Abfallwirtschaft (SAGA) was founded as a municipal task force. SAGA`s task is to debate common affairs in the waste management sector with a view to joint planning and joint facilities. In particular, the requirements of the technical code on municipal waste must be met. (orig.) [Deutsch] Im Jahre 1994 haben die suedhessischen Landkreise Darmstadt-Dieburg, Bergstrasse, Odenwald, Gross-Gerau sowie die Stadt Darmstadt beschlossen, bezueglich der kuenftigen Anforderung der TA Siedlungsabfall und des Kreislaufwirtschafts- und Abfallgesetzes zu kooperieren. Zur formellen Vorbereitung von verschiedenen dann auszufuehrenden Kooperationsformen und zur Begleitung entsprechender Voruntersuchungen wurde die Suedhessische Arbeitsgemeinschaft Abfallwirtschaft (SAGA) als Kommunale Arbeitsgemeinschaft gegruendet. Aufgabe der Kommunalen Arbeitsgemeinschaft ist es, gemeinsam beruehrende Angelegenheiten im Abfallbereich unter dem Gesichtspunkt gemeinsamer Planung und gemeinsamer Einrichtungen zu beraten. Hierbei sollen insbesondere die Vorgaben der TA Siedlungsabfall beruecksichtigt werden. (orig.)

  19. Planning for land use and conservation: Assessing GIS-based conservation software for land use planning

    Science.gov (United States)

    Rob Baldwin; Ryan Scherzinger; Don Lipscomb; Miranda Mockrin; Susan Stein

    2014-01-01

    Recent advances in planning and ecological software make it possible to conduct highly technical analyses to prioritize conservation investments and inform local land use planning. We review these tools, termed conservation planning tools, and assess the knowledge of a key set of potential users: the land use planning community. We grouped several conservation software...

  20. Integrated Task and Motion Planning with Verification via Formal Methods

    Data.gov (United States)

    National Aeronautics and Space Administration — This proposal lays out a research plan to "lift" current state-of-the-art results combining discrete and continuous layers of planning in motion planning to the more...

  1. Looking Back, Moving Forward: Technical, Normative, and Political Dimensions of School Discipline

    Science.gov (United States)

    Wiley, Kathryn E.; Anyon, Yolanda; Yang, Jessica L.; Pauline, Malina E.; Rosch, Alyssa; Valladares, Giovana; Downing, Barbara J.; Pisciotta, Lisa

    2018-01-01

    Purpose: School discipline reformers have presumed that such work is largely a technical task, emphasizing discrete changes to discipline policies and protocols. Yet prior theory and research suggest that emphasizing technical changes may overlook additional and important aspects of reform, namely, the normative and political dimensions within…

  2. Technical Work Plan For: Meteorological Monitoring and Data Analysis

    International Nuclear Information System (INIS)

    C.T. Bastian

    2003-01-01

    The meteorological monitoring and analysis program has three overall objectives. First, the program will acquire qualified meteorological data from monitoring activities in the Environmental Safety and Health (ES and H) network, including appropriate controls on measuring and test equipment. All work will be completed in accordance with U.S. Department of Energy (DOE) Office of Repository Development (ORD) administrative procedures and Bechtel SAIC Co., LLC (BSC) line procedures. The continuously operating monitoring program includes measuring and test equipment calibrations, operational checks, preventive and corrective maintenance, and data collection. Second, the program will process the raw monitoring data collected in the field and submit technically reviewed, traceable data to the Technical Data Management System (TDMS) and the Records Processing Center. Third, reports containing analyses or calculations could be created to provide information to data requesters

  3. Intelligent robot action planning

    Energy Technology Data Exchange (ETDEWEB)

    Vamos, T; Siegler, A

    1982-01-01

    Action planning methods used in intelligent robot control are discussed. Planning is accomplished through environment understanding, environment representation, task understanding and planning, motion analysis and man-machine communication. These fields are analysed in detail. The frames of an intelligent motion planning system are presented. Graphic simulation of the robot's environment and motion is used to support the planning. 14 references.

  4. LSC (X) Logistics Planning Support, Task 1 Requirements Definition

    National Research Council Canada - National Science Library

    Scalzo, John

    2004-01-01

    .... During the early stage after vessel delivery, there is a requirement to manage this plan through a transition period until the designated support manager is under contract and/or provided with the resources to execute the plan.

  5. Writing Clinic for Business and Technical Writers.

    Science.gov (United States)

    Mercer County Community Coll., Trenton, NJ.

    This document offers brief lesson plans for four courses: (1) an 8-hour refresher course for employees who write memos, short reports, and letters; (2) an 8-hour refresher course on creating a short document; (3) a 16-hour course on technical manual writing; and (4) an 8-hour course on technical manual writing. The courses were part of a workplace…

  6. Licensing of safety critical software for nuclear reactors. Common position of seven European nuclear regulators and authorised technical support organisations

    International Nuclear Information System (INIS)

    2007-01-01

    licensing software-based systems. This document should neither be considered as a standard, nor as a new set of European regulations, nor as a common subset of national regulations, nor as a replacement for national policies. It is the account, as complete as possible, of a common technical agreement among regulatory and safety experts. National regulations may have additional requirements or different requirements, but hopefully in the end no essential divergence with the common positions. It is precisely from this common agreement that regulators can draw support and benefit when assessing safety cases, licensee's submissions, and issuing regulations. The document is also useful to licensees, designers, suppliers for issuing bids and developing new applications. Evidence to support the safety demonstration of a computer based digital system is produced throughout the system life cycle, and evolves in nature and substance with the project. The task force has adopted the view that three basic independent types of evidence can and must be produced: evidence related to the quality of the development process; evidence related to the adequacy of the product; and evidence of the competence and qualifications of the staff involved in all of the system life cycle phases. In addition, convincing operating experience may be needed to support the safety demonstration of pre-existing software. As a consequence, the task force reached early agreement on an important fundamental recommendation that applies at the inception of any project, namely: A safety plan shall be agreed upon at the beginning of the project between the licensor and the licensee. This plan shall identify how the safety demonstration will be achieved. More precisely, the plan shall identify the types of evidence that will be used, and how and when this evidence shall be produced. This report neither specifies nor imposes the contents of a specific safety plan. All the subsequent recommendations are founded on the

  7. THE PROGRAM-TARGET PLANNING AND MANAGEMENT OF DEVELOPMENT OF MEASURING EQUIPMENT PARK

    Directory of Open Access Journals (Sweden)

    Marichev Pavel Aleksandrovich

    2018-02-01

    Full Text Available Subject: study of the Park of Measuring Equipment (PME that includes hundreds of thousands of standard samples, measuring instruments, control and measuring devices and other measuring mechanisms with different areas of application, levels of reliability, service life, levels of technical perfection and levels of technical condition. Research objectives: 1. Development of a complex of mathematical models to simulate the processes of development of PME, control indicators of PME performance as a whole, purposefully control the stages of life cycle of measuring equipment samples. 2. Development of the method which, with a sufficient degree of validity and objectivity, would solve the tasks of management of procurement and repairs both in preparation of proposals for preliminary long-term plan documents (LTPD and to ensure control over the implementation of adopted plans. Thus, the method being developed should be fairly simple to use, easily adjustable for solving problems of different dimensions, suitable for solving the optimal control problem for PME as a whole, for a part of PME, and also suitable for solving a generalized problem for certain “aggregated objects” such as the Metrology Centers. Materials and methods: the methods of mathematical simulation, methods of comparative analysis, simplex method for solving linear programming problem, methods of program-target planning were used. Results: an approach to the solution of problems of program-target planning based on solving a series of linear programming problems has been developed. The results have been presented of using the approach both for formulation of proposals into the preliminary LTPD and also for introducing revisions (amendments to annual plans, which are implemented in the framework of the state defense order. Conclusions: the described method and algorithms constitute an effective tool for solving practical problems of target-oriented management of PME performance

  8. Health and safety plan for operations performed for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II (IT Corp., (United States)); Reneau, M.; Morton, S.L. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  9. Health and safety plan for operations performed for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    Trippet, W.A. II; Reneau, M.; Morton, S.L.

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG ampersand G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP

  10. CERN Technical Training : Vista !

    CERN Multimedia

    HR Department

    2009-01-01

    Are you running Vista on your new PC – or are you planning to install it? The Technical Training service is organizing a half-day training course on the new features of the VISTA operating system. This course introduces the new interfaces and presents the new functionalities for people who are experienced in the use of Windows XP. The next bilingual session of this course will take place on 30 January 2009. Register using our catalogue: http://cta.cern.ch/cta2/f?p=110:9 or contact us with your questions/comments at mailto:Technical.Training@cern.ch

  11. CERN Technical Training : Vista !

    CERN Multimedia

    HR Department

    2008-01-01

    Are you running Vista on your new PC – or are planning to install it? The Technical Training service is organizing a half-day training course on the new features of the VISTA operating system. This course introduces the new interfaces and presents the new functionalities for people who are experienced in the use of Windows XP. The next bilingual sessions of this course will take place on 12 December 2008 and 30 January 2009. Register using our catalogue: http://cta.cern.ch/cta2/f?p=110:9 or contact us with your questions/comments at Technical.Training@cern.ch

  12. CERN Technical Training : Vista !

    CERN Multimedia

    HR Department

    2008-01-01

    You are running Vista on your new PC – or are planning to install it? The Technical Training service is organizing a half-day training course on the new features of the VISTA operating system. This course introduces the new interfaces and presents the new functionalities for people who are experienced in the use of Windows XP. The next bilingual sessions of this course will take place on 12 December 2008 and 30 January 2009. Register using our catalogue: http://cta.cern.ch/cta2/f?p=110:9 or contact us with your questions/comments at mailto:Technical.Training@cern.ch

  13. CERN Technical Training : Vista !

    CERN Multimedia

    HR Department

    2008-01-01

    Are you running Vista on your new PC – or are you planning to install it? The Technical Training service is organizing a half-day training course on the new features of the VISTA operating system. This course introduces the new interfaces and presents the new functionalities for people who are experienced in the use of Windows XP. The next bilingual sessions of this course will take place on 12 December 2008 and 30 January 2009. Register using our catalogue: http://cta.cern.ch/cta2/f?p=110:9 or contact us with your questions/comments at mailto:Technical.Training@cern.ch

  14. CERN Technical Training : Vista !

    CERN Multimedia

    HR Department

    2008-01-01

    You are running Vista on your new PC – or are planning to install it? The Technical Training service is organizing a half-day training on the new features of the VISTA operating system. This course introduces the new interfaces and presents the new functionalities for people who are experienced using Windows XP. The next bilingual sessions of this course will take place on December 12, 2008 and January 30, 2009. Register using our catalogue : http://cta.cern.ch/cta2/f?p=110:9 or contact us with your questions/comments at Technical.Training@cern.ch

  15. Procedural Error and Task Interruption

    Science.gov (United States)

    2016-09-30

    interruption. A cognitive model we discuss below explains this effect in terms of increases in performance speed having the effect of compressing memory for...performance, and pilot data suggest that the task can distinguish between cognitive processes that are impaired by sleep deprivation and those that are...David Z. Hambrick Technical contact: Erik M. Altmann Michigan State University Department of Psychology 316 Physics Rd, Room 298A East Lansing

  16. Global Threat Reduction Initiative Fuel Thermo-Physical Characterization Project: Sample Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Casella, Amanda J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Pereira, Mario M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Steen, Franciska H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-01-01

    This sample management plan provides guidelines for sectioning, preparation, acceptance criteria, analytical path, and end-of-life disposal for the fuel element segments utilized in the Global Threat Reduction Initiative (GTRI), Fuel Thermo-Physical Characterization Project. The Fuel Thermo-Physical Characterization Project is tasked with analysis of irradiated Low Enriched Uranium (LEU) Molybdenum (U-Mo) fuel element samples to support the GTRI conversion program. Sample analysis may include optical microscopy (OM), scanning electron microscopy (SEM) fuel-surface interface analysis, gas pycnometry (density) measurements, laser flash analysis (LFA), differential scanning calorimetry (DSC), thermogravimetry and differential thermal analysis with mass spectroscopy (TG /DTA-MS), Inductively Coupled Plasma Spectrophotometry (ICP), alpha spectroscopy, and Thermal Ionization Mass Spectroscopy (TIMS). The project will utilize existing Radiochemical Processing Laboratory (RPL) operating, technical, and administrative procedures for sample receipt, processing, and analyses. Test instructions (TIs), which are documents used to provide specific details regarding the implementation of an existing RPL approved technical or operational procedure, will also be used to communicate to staff project specific parameters requested by the Principal Investigator (PI). TIs will be developed, reviewed, and issued in accordance with the latest revision of the RPL-PLN-700, RPL Operations Plan. Additionally, the PI must approve all project test instructions and red-line changes to test instructions.

  17. Multi-Perspective Planning - Using Domain Constraints to Support the Coordinated Development of Plans

    National Research Council Canada - National Science Library

    Tate, Austin

    1999-01-01

    .... Each agent maintains an agenda of outstanding tasks they are engaged in and uses a common representation of tasks, plans, processes and activities based on the notion that these are all "constraints on behavior...

  18. Staff Considerations in Technical Services: The Chameleon Approach.

    Science.gov (United States)

    Foster, Constance L.

    1988-01-01

    Discusses the need to cope effectively with technological transitions in library technical services and to plan for successful staff development. The areas discussed include changing job skills, financial planning, ergonomics, innovative partnerships, training, and an emphasis on human resources development. (21 references) (Author/CLB)

  19. Goal striving strategies and effort mobilization: When implementation intentions reduce effort-related cardiac activity during task performance.

    Science.gov (United States)

    Freydefont, Laure; Gollwitzer, Peter M; Oettingen, Gabriele

    2016-09-01

    Two experiments investigate the influence of goal and implementation intentions on effort mobilization during task performance. Although numerous studies have demonstrated the beneficial effects of setting goals and making plans on performance, the effects of goals and plans on effort-related cardiac activity and especially the cardiac preejection period (PEP) during goal striving have not yet been addressed. According to the Motivational Intensity Theory, participants should increase effort mobilization proportionally to task difficulty as long as success is possible and justified. Forming goals and making plans should allow for reduced effort mobilization when participants perform an easy task. However, when the task is difficult, goals and plans should differ in their effect on effort mobilization. Participants who set goals should disengage, whereas participants who made if-then plans should stay in the field showing high effort mobilization during task performance. As expected, using an easy task in Experiment 1, we observed a lower cardiac PEP in both the implementation intention and the goal intention condition than in the control condition. In Experiment 2, we varied task difficulty and demonstrated that while participants with a mere goal intention disengaged from difficult tasks, participants with an implementation intention increased effort mobilization proportionally with task difficulty. These findings demonstrate the influence of goal striving strategies (i.e., mere goals vs. if-then plans) on effort mobilization during task performance. Copyright © 2016 Elsevier B.V. All rights reserved.

  20. Demand Response as a System Reliability Resource

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division; Lewis, Nancy Jo [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division; Watson, David [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division; Kiliccote, Sila [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division; Auslander, David [Univ. of California, Berkeley, CA (United States); Paprotny, Igor [Univ. of California, Berkeley, CA (United States); Makarov, Yuri [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2012-12-31

    The Demand Response as a System Reliability Resource project consists of six technical tasks: • Task 2.1. Test Plan and Conduct Tests: Contingency Reserves Demand Response (DR) Demonstration—a pioneering demonstration of how existing utility load-management assets can provide an important electricity system reliability resource known as contingency reserve. • Task 2.2. Participation in Electric Power Research Institute (EPRI) IntelliGrid—technical assistance to the EPRI IntelliGrid team in developing use cases and other high-level requirements for the architecture. • Task 2.3. Research, Development, and Demonstration (RD&D) Planning for Demand Response Technology Development—technical support to the Public Interest Energy Research (PIER) Program on five topics: Sub-task 1. PIER Smart Grid RD&D Planning Document; Sub-task 2. System Dynamics of Programmable Controllable Thermostats; Sub-task 3. California Independent System Operator (California ISO) DR Use Cases; Sub-task 4. California ISO Telemetry Requirements; and Sub-task 5. Design of a Building Load Data Storage Platform. • Task 2.4. Time Value of Demand Response—research that will enable California ISO to take better account of the speed of the resources that it deploys to ensure compliance with reliability rules for frequency control. • Task 2.5. System Integration and Market Research: Southern California Edison (SCE)—research and technical support for efforts led by SCE to conduct demand response pilot demonstrations to provide a contingency reserve service (known as non-spinning reserve) through a targeted sub-population of aggregated residential and small commercial customers enrolled in SCE’s traditional air conditioning (AC) load cycling program, the Summer Discount Plan. • Task 2.6. Demonstrate Demand Response Technologies: Pacific Gas and Electric (PG&E)—research and technical support for efforts led by PG&E to conduct a demand response pilot demonstration to provide non

  1. Safety against releases in severe accidents. Annual report 1996. Project plan 1997

    International Nuclear Information System (INIS)

    1997-01-01

    The work scope of the RAK-2 project is divided into three sub-projects: RAK-2.1 Severe Accident Phenomenology; RAK-2.2 Computerised Accident Management; RAK-2.3 Reactors In Nordic Surroundings. The work in subproject 1 progresses roughly according to budget and time schedule. Some adjustments in the technical work scope were made during 1996. Main tasks of RAK-2.1 in 1996: Complete recriticality studies for Nordic BWRs; Investigate phenomena related to late phase melt progression; Issue and NKS Final Technical Report on KTH experiments. Main tasks of RAK-2.2 in 1996: CAMS would be further developed with signal validation, tracking simulation, state identification and PSA and risk monitoring applications; Carry out a feasibility study for development of a PWR version of CAMS in collaboration with EdF, France; Use CAMS in the Halden Man-Machine laboratory to perform human factor studies. Main tasks of RAK-2.3 in 1996: Collect and report data from the British reactor types AGR, MAGNOX and PWR; Make a report on accidents in nuclear ships; Put the collected data together in a common data base covering neighbour reactors treated in SIK-3 and RAK-2.3; Update the data in the former SIK-3 report if needed. The work in project 2 progresses according to plans. The data collection of British reactors with in sub-project 3 has been delayed significantly due to difficulty of obtaining information from some of the British utilities, but the problems are expected to be solved by the end of 1997. (EG)

  2. Planning and management of uranium mine and mill closures. Proceedings of a technical committee meeting held in Liberec, Czech Republic, 3-6 May 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Technical Committee Meeting on Planning and Management of Uranium Mine and Mill Closures was held in Liberec, Czech Republic from 3 to 6 May 1994. A total of 30 participants from nine countries attended the meeting. Nineteen papers were presented. Most of these papers dealt with the concept of and experiences in planning for and the subsequent decommissioning and rehabilitation of uranium mines and mills in Australia, Canada, Czech Republic, Germany, Romania, Slovenia, Spain and the USA. Two papers discussed the government`s role and relevant regulations related to the closures, decommissioning and remediation of uranium production facilities. Of particular interest to the participants was a non-technical paper presented by the Mayor of the city of Andujar, Spain, describing the negative political and socio-economic impacts associated with closure and decommissioning of an uranium mine/mill facility. The highlights of the meeting were the field visits to the uranium production facilities and rehabilitation programme sites of DIAMO and WISMUT companies, located respectively in Straz, Czech Republic and Koenigstein, Germany. Refs, figs and tabs.

  3. Minutes of the IFMIF technical meeting

    International Nuclear Information System (INIS)

    Nakamura, H.; Takeda, M.; Ida, M.; Maebara, S.; Yutani, T.; Sugimoto, M.

    2004-03-01

    The IFMIF Technical Meeting was held on December 4-5, 2003 at Shiran-kaikan, Kyoto University. The main objectives are 1) to finalize the Comprehensive Design Report (CDR), 2) to discuss IFMIF cost and organization, 3) to review technical status of major systems, transition phase activities and EVEDA plan. This report presents a brief summary of the results of the meeting. Agenda, participants list and presentation materials are attached as Appendix. (author)

  4. Action planning and position sense in children with Developmental Coordination Disorder

    NARCIS (Netherlands)

    Adams, I.L.; Ferguson, G.D.; Lust, J.M.; Steenbergen, B.; Smits-Engelsman, B.C.M.

    2016-01-01

    The present study examined action planning and position sense in children with Developmental Coordination Disorder (DCD). Participants performed two action planning tasks, the sword task and the bar grasping task, and an active elbow matching task to examine position sense. Thirty children were

  5. 5D Task Analysis Visualization Tool Phase II, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The creation of a five-dimensional task analysis visualization (5D-TAV) software tool for Task Analysis and Workload Planning using multi-dimensional visualization...

  6. Efficient Symbolic Task Planning for Multiple Mobile Robots

    Science.gov (United States)

    2016-12-13

    shows a map of the testing environment. S1 and S2 ( green rectangles) are the initial positions of two robots, and G1 and G2 (red ellipses) show their...intelligence, pages 1594–1597. AAAI Press, 2008. [25] Mausam and D. S. Weld . Planning with durative actions in stochastic domains. J. Artif. Intell. Res...JAIR), 31:33–82, 2008. [26] D. McDermott, M. Ghallab, A. Howe, C. Knoblock, A. Ram, M. Veloso, D. Weld , and D. Wilkins. Pddl-the planning domain

  7. Division of Development and Technology Plasma/Materials Interaction and High Heat Flux Materials and Components Task Groups: Report on the joint meeting, July 9, 1986

    International Nuclear Information System (INIS)

    Watson, R.D.

    1986-09-01

    This paper contains a collection of viewgraphs from a joint meeting of the Division of Development and Technology Plasma/Materials Interaction and High Heat Flux Materials and Components Task Groups. A list of contributing topics is: PPPL update, ATF update, Los Alamos RFP program update, status of DIII-D, PMI graphite studies at ORNL, PMI studies for low atomic number materials, high heat flux materials issues, high heat flux testing program, particle confinement in tokamaks, helium self pumping, self-regenerating coatings technical planning activity and international collaboration update

  8. Planning for What Kind of Teaching? Supporting Cooperating Teachers as Teachers of Planning

    Science.gov (United States)

    Norman, Patricia J.

    2011-01-01

    Planning is a central task of teaching and a central focus in learning to teach. But what does planning entail, and how is planning best learned? What challenges do experienced teachers serving as school-based teacher educators face in becoming teachers of planning? What role can university teacher educators play in helping mentor teachers learn…

  9. Customisation of an instrument to assess anaesthesiologists' non-technical skills.

    Science.gov (United States)

    Jepsen, Rikke M H G; Spanager, Lene; Lyk-Jensen, Helle T; Dieckmann, Peter; Østergaard, Doris

    2015-02-22

    The objectives of the study were to identify Danish anaesthesiologists' non-technical skills and to customise the Scottish-developed Anaesthetists' Non-Technical Skills instrument for Danish anaesthesiologists. Six semi-structured group interviews were conducted with 31 operating room team members: anaes-thesiologists, nurse anaesthetists, surgeons, and scrub nurses. Interviews were transcribed verbatim and analysed using directed content analysis. Anaesthesiologists' non-technical skills were identified, coded, and sorted using the original instrument as a basis. The resulting prototype instrument was discussed with anaesthesiologists from 17 centres to ensure face validity. Interviews lasted 46-67 minutes. Identified examples of anaesthesiologists' good or poor non-technical skills fit the four categories in the original instrument: situation awareness; decision making; team working; and task management. Anaesthesiologists' leadership role in the operating room was emphasised: the original 'Task Management' category was named 'Leadership'. One new element, 'Demonstrating self-awareness' was added under the category 'Situation Awareness'. Compared with the original instrument, half of the behavioural markers were new, which reflected that being aware of and communicating one's own abilities to the team; working systematically; and speaking up to avoid adverse events were important skills. The Anaesthetists' Non-Technical Skills instrument was customised to a Danish setting using the identified non-technical skills for anaesthesiologists and the original instrument as basis. The customised instrument comprises four categories and 16 underpinning elements supported by multiple behavioural markers. Identifying non-technical skills through semi-structured group interviews and analysing them using direct content analysis proved a useful method for customising an assessment instrument to another setting.

  10. The Oregon Geothermal Planning Conference

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-02

    Oregon's geothermal resources represent a large portion of the nation's total geothermal potential. The State's resources are substantial in size, widespread in location, and presently in various stages of discovery and utilization. The exploration for, and development of, geothermal is presently dependent upon a mixture of engineering, economic, environmental, and legal factors. In response to the State's significant geothermal energy potential, and the emerging impediments and incentives for its development, the State of Oregon has begun a planning program intended to accelerate the environmentally prudent utilization of geothermal, while conserving the resource's long-term productivity. The program, which is based upon preliminary work performed by the Oregon Institute of Technology's Geo-Heat Center, will be managed by the Oregon Department of Energy, with the assistance of the Departments of Economic Development, Geology and Mineral Industries, and Water Resources. Funding support for the program is being provided by the US Department of Energy. The first six-month phase of the program, beginning in July 1980, will include the following five primary tasks: (1) coordination of state and local agency projects and information, in order to keep geothermal personnel abreast of the rapidly expanding resource literature, resource discoveries, technological advances, and each agency's projects. (2) Analysis of resource commercialization impediments and recommendations of incentives for accelerating resource utilization. (3) Compilation and dissemination of Oregon geothermal information, in order to create public and potential user awareness, and to publicize technical assistance programs and financial incentives. (4) Resource planning assistance for local governments in order to create local expertise and action; including a statewide workshop for local officials, and the formulation of two specific community resource development

  11. Radiological Work Planning and Procedures

    CERN Document Server

    Kurtz, J E

    2000-01-01

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In add...

  12. Determination of aims military-technical policy of Ukraine

    Directory of Open Access Journals (Sweden)

    O. F. Salnikova

    2014-06-01

    Full Text Available In the article the aims of military-technical policy are considered. Determination of aims (tasks of military-technical policy, its maintenance, requirements to it and directions of its further development it must come true by the analysis of different factors of external and internal environment. Among such factors: geopolitical and military-political position of Ukraine and its military doctrine; realized and operating programs of development (reformation of the soldiery forming and them technical rigging; terms of future military operations and progress of their maintenance, forms, methods and characteristic signs of battle actions trend; substantive provisions of art of war; conceptions, theories and doctrines of battle application of the soldiery forming of the different states; resources dedicated by the state on development of military-technical sphere and others like that. The fundamental chart of sequence of forming of public military-technical policy is presented in the article.

  13. Applied Welding Technology. Technical Committee Report.

    Science.gov (United States)

    Idaho State Dept. of Education, Boise. Div. of Vocational Education.

    This Technical Committee Report prepared by industry representatives in Idaho lists the skills currently necessary for an employee in that state to obtain a job in applied welding technology, retain a job once hired, and advance in that occupational field. (Task lists are grouped according to duty areas generally used in industry settings, and are…

  14. Drafting & Design Technology. Technical Committee Report.

    Science.gov (United States)

    Idaho State Dept. of Education, Boise. Div. of Vocational Education.

    This Technical Committee Report prepared by industry representatives in Idaho lists the skills currently necessary for an employee in that state to obtain a job in drafting and design technology, retain a job once hired, and advance in that occupational field. (Task lists are grouped according to duty areas generally used in industry settings, and…

  15. Housing, health and master planning: rules of engagement.

    Science.gov (United States)

    Harris, P; Haigh, F; Thornell, M; Molloy, L; Sainsbury, P

    2014-04-01

    Knowledge about health focussed policy collaboration to date has been either tactical or technical. This article focusses on both technical and tactical issues to describe the experience of cross-sectoral collaboration between health and housing stakeholders across the life of a housing master plan, including but not limited to a health impact assessment (HIA). A single explanatory case study of collaboration on a master plan to regenerate a deprived housing estate in Western Sydney was developed to explain why and how the collaboration worked or did not work. Data collection included stakeholder interviews, document review, and reflections by the health team. Following a realist approach, data was analysed against established public policy theory dimensions. Tactically we did not know what we were doing. Despite our technical knowledge and skills with health focussed processes, particularly HIA, we failed to appreciate complexities inherent in master planning. This limited our ability to provide information at the right points. Eventually however the HIA did provide substantive connections between the master plan and health. We use our analysis to develop technical and tactical rules of engagement for future cross-sectoral collaboration. This case study from the field provides insight for future health focussed policy collaboration. We demonstrate the technical and tactical requirements for future intersectoral policy and planning collaborations, including HIAs, with the housing sector on master planning. The experience also suggested how HIAs can be conducted flexibly alongside policy development rather than at a specific point after a policy is drafted. Copyright © 2014 The Royal Society for Public Health. All rights reserved.

  16. Recommendation 93-5 Implementation Plan

    International Nuclear Information System (INIS)

    1994-01-01

    On July 19, 1993, the Defense Nuclear Facilities Safety Board (DNFSB) provided to the Secretary of Energy its Recommendation 93-5, which commented on the Hanford Tank Waste Characterization effort. Recommendation 93-5 highlighted the need to accelerate the characterization of the Hanford Site tank wastes to expedite the resolution of identified tank safety issues, and to provide timely design data in support of activities addressing the disposal of the tank wastes. The Department of Energy (DOE) and its prime contractor, Westinghouse Hanford Company (WHC), are in full agreement with the content of Recommendation 93-5 and have prepared this Implementation Plan to document those actions that have been or will be taken to meet Recommendation 93-5. The new Characterization Strategy embodied by this Plan acknowledges that waste distribution within a tank is the critical unknown with respect to successfully characterizing the tank for any Tank Waste Remediation Systems (TWRS) programmatic need. The new strategy has been incorporated into the following seven task: (1) strengthen technical management; (2) accelerate safety related characterization; (3) improve the quality and quantity of sampling (4) streamline tank access; (5) improve the quality and quantity of analyses; (6) improve data management; and (7) change control

  17. Assessing Nurse Anaesthetists' Non-Technical Skills in the operating room.

    Science.gov (United States)

    Lyk-Jensen, H T; Jepsen, R M H G; Spanager, L; Dieckmann, P; Østergaard, D

    2014-08-01

    Incident reporting and fieldwork in operating rooms have shown that some of the errors that arise in anaesthesia relate to inadequate use of non-technical skills. To provide a tool for training and feedback on nurse anaesthetists' non-technical skills, this study aimed to adapt the Anaesthetists' Non-Technical Skills (ANTS) as a behavioural marker system for the formative assessment of nurse anaesthetists' non-technical skills in the operating room. A qualitative approach with focus group interviews was used to identify the non-technical skills of nurse anaesthetists in the operating room. The interview data were transcribed verbatim. Directed content analysis was used to code and sort data deductively into the ANTS categories: task management, team working, situation awareness and decision making. The prototype named Nurse Anaesthetists' Non-Technical Skills (N-ANTS) was presented and discussed in a group of subject matter experts to ensure face validity. The N-ANTS system consists of the same four categories as ANTS and 15 underlying elements. Three to five good and poor behavioural markers for each element were identified. The headings and definitions of the categories and elements were adjusted to encompass the behavioural markers in N-ANTS. The differences that emerged mainly reflected statements regarding the establishment of role, competence, and task delegation. A behavioural marker system, N-ANTS, for nurse anaesthetists was adapted from a behavioural marker system, ANTS, for anaesthesiologists. © 2014 The Acta Anaesthesiologica Scandinavica Foundation. Published by John Wiley & Sons Ltd.

  18. Technical area status report for low-level mixed waste final waste forms

    International Nuclear Information System (INIS)

    Mayberry, J.L.; DeWitt, L.M.; Darnell, R.

    1993-08-01

    The Final Waste Forms (FWF) Technical Area Status Report (TASR) Working Group, the Vitrification Working Group (WG), and the Performance Standards Working Group were established as subgroups to the FWF Technical Support Group (TSG). The FWF TASR WG is comprised of technical representatives from most of the major DOE sites, the Nuclear Regulatory Commission (NRC), the EPA Office of Solid Waste, and the EPA's Risk Reduction Engineering Laboratory (RREL). The primary activity of the FWF TASR Working Group was to investigate and report on the current status of FWFs for LLNM in this TASR. The FWF TASR Working Group determined the current status of the development of various waste forms described above by reviewing selected articles and technical reports, summarizing data, and establishing an initial set of FWF characteristics to be used in evaluating candidate FWFS; these characteristics are summarized in Section 2. After an initial review of available information, the FWF TASR Working Group chose to study the following groups of final waste forms: hydraulic cement, sulfur polymer cement, glass, ceramic, and organic binders. The organic binders included polyethylene, bitumen, vinyl ester styrene, epoxy, and urea formaldehyde. Section 3 provides a description of each final waste form. Based on the literature review, the gaps and deficiencies in information were summarized, and conclusions and recommendations were established. The information and data presented in this TASR are intended to assist the FWF Production and Assessment TSG in evaluating the Technical Task Plans (TTPs) submitted to DOE EM-50, and thus provide DOE with the necessary information for their FWF decision-making process. This FWF TASR will also assist the DOE and the MWIP in establishing the most acceptable final waste forms for the various LLMW streams stored at DOE facilities

  19. Pacific Northwest Laboratory tasks supporting the Office of Technology Development national program

    International Nuclear Information System (INIS)

    Slate, S.C.

    1993-01-01

    The purpose of this document is to provide a concise summary of the Pacific Northwest Laboratory's (PNL) tasks being conducted for the Department of Energy's (DOE) Office of Technology Development (OTD). The summaries are useful to principal investigators who want to link their work to others doing similar work, to staff in DOE operating programs who are looking for better solutions to current problems, and to private industry which may be interested in teaming with PNL to commercialize the technology. The tasks are organized within Hanford's overall Work Breakdown Structure (WBS), which is a hierarchical organization of the Hanford mission into subordinate missions. The technology development tasks are all in WBS 3.2. The first subordinate steps under WBS 3.2 are general categories of technology development, such as Soils and Groundwater Cleanup. The next level is the Integrated Program (IP) and Integrated Demonstration (ID) level. An IP is a centrally managed series of projects which explore and develop a particular technology, such as characterization, for application to a wide spectrum of problems. An ID brings multiple technology systems to bear on an actual problem; for example, a carbon tetrachloride plume migrating through the soil is being remediated with biological agents, heating the soil, and destruction of the contamination in vapor removed from the soil. IDs and IPs are identified by an alphanumeric code: GSO2 is the second ID under Groundwater and Soils Cleanup. The final step in the breakout is the Technical Task Plan (TTP). These are individual tasks which support the ID/IP. They are identified by a six-digit number in the format 3211-01. The WBS structure for Technology Development down to the ID/IP level is shown

  20. Reliability and safety program plan outline for the operational phase of a waste isolation facility

    International Nuclear Information System (INIS)

    Ammer, H.G.; Wood, D.E.

    1977-01-01

    A Reliability and Safety Program plan outline has been prepared for the operational phase of a Waste Isolation Facility. The program includes major functions of risk assessment, technical support activities, quality assurance, operational safety, configuration monitoring, reliability analysis and support and coordination meetings. Detailed activity or task descriptions are included for each function. Activities are time-phased and presented in the PERT format for scheduling and interactions. Task descriptions include manloading, travel, and computer time estimates to provide data for future costing. The program outlined here will be used to provide guidance from a reliability and safety standpoint to design, procurement, construction, and operation of repositories for nuclear waste. These repositories are to be constructed under the National Waste Terminal Storage program under the direction of the Office of Waste Isolation, Union Carbide Corp. Nuclear Division