  1. Project Plan Remote Target Fabrication Refurbishment Project

    International Nuclear Information System (INIS)

    Bell, Gary L.; Taylor, Robin D.

    2009-01-01

    In early FY2009, the DOE Office of Science - Nuclear Physics Program reinstated a program for continued production of 252 Cf and other transcurium isotopes at the Radiochemical Engineering Development Center (REDC) at Oak Ridge National Laboratory (ORNL). The FY2009 major elements of the workscope are as follows: (1) Recovery and processing of seven transuranium element targets undergoing irradiation at the High Flux Isotope Reactor (HFIR) at ORNL; (2) Development of a plan to manufacture new targets for irradiation beginning in early- to mid-FY10 to supply irradiated targets for processing Campaign 75 (TRU75); and (3) Refurbishment of the target manufacturing equipment to allow new target manufacture in early FY10 The 252 Cf product from processing Campaign 74 (recently processed and currently shipping to customers) is expected to supply the domestic demands for a period of approximately two years. Therefore it is essential that new targets be introduced for irradiation by the second quarter of FY10 (HFIR cycle 427) to maintain supply of 252 Cf; the average irradiation period is ∼10 HFIR cycles, requiring about 1.5 calendar years. The strategy for continued production of 252 Cf depends upon repairing and refurbishing the existing pellet and target fabrication equipment for one additional target production campaign. This equipment dates from the mid-1960s to the late 1980s, and during the last target fabrication campaign in 2005- 2006, a number of component failures and operations difficulties were encountered. It is expected that following the target fabrication and acceptance testing of the targets that will supply material for processing Campaign 75 a comprehensive upgrade and replacement of the remote hot-cell equipment will be required prior to subsequent campaigns. Such a major refit could start in early FY 2011 and would take about 2 years to complete. Scope and cost estimates for the repairs described herein were developed, and authorization for the work

  2. Refurbishment programs

    International Nuclear Information System (INIS)

    Irish, C.S.

    2004-01-01

    As nuclear plants age, equipment becomes obsolete, outdated or just simply unreliable. This puts a lot of emphasis on replacement of the subject equipment. This can be an expensive proposition for safety related equipment due to design changes, requalification charges and the cost of the new equipment, specifically when the original component is obsolete. The presentation will explain how comprehensive refurbishment programs on many different types of equipment can alleviate this situation. The refurbishment program is a systematic refurbishment of equipment to an as new condition by replacing all of the age sensitive components within the equipment. This is carried out on all of the same type of equipment in a scheduled program. For example the plant may to decide to refurbish all of their Lambda LME-24 power supplies, or all of their Bailey modules, or all of their Agastat DSC Series relays. Independent of the item the process is the same. Refurbish each piece of equipment to an as new condition by replacing all of the age sensitive equipment. The equipment is then returned to the client as safety related, existing qualification maintained and with a new service life/warranty. This is not a simple repair. It is a planned refurbishment to an as new condition of certain equipment types throughout the plant and then carried out from equipment piece to equipment piece. The refurbishment program may even include introducing new spares into the plant. This is normally performed by upgrading (dedicating for safety related use and refurbishing to an 'as new' condition) surplus equipment and using these equipment pieces in the rotation of the plant equipment to refurbish the entire population of a selected piece of equipment at the plant. This process can be performed on many equipment types including power supplies, circuit boards, modules, relays, motors, breakers, and many more. The refurbishment program greatly increases the reliability of the equipment without the

  3. Computer Refurbishment

    International Nuclear Information System (INIS)

    Ichiyen, Norman; Chan, Dominic; Thompson, Paul

    2004-01-01

    The major activity for the 18-month refurbishment outage at the Point Lepreau Generating Station is the replacement of all 380 fuel channel and calandria tube assemblies and the lower portion of connecting feeder pipes. New Brunswick Power would also take advantage of this outage to conduct a number of repairs, replacements, inspections and upgrades (such as rewinding or replacing the generator, replacement of shutdown system trip computers, replacement of certain valves and expansion joints, inspection of systems not normally accessible, etc.). This would allow for an additional 25 to 30 years. Among the systems to be replaced are the PDC's for both shutdown systems. Assessments have been completed for both the SDS1 and SDS2 PDC's, and it has been decided to replace the SDS2 PDCs with the same hardware and software approach that has been used successfully for the Wolsong 2, 3, and 4 and the Qinshan 1 and 2 SDS2 PDCs. For SDS1, it has been decided to use the same software development methodology that was used successfully for the Wolsong and Qinshan called the I A and to use a new hardware platform in order to ensure successful operation for the 25-30 year station operating life. The selected supplier is Triconex, which uses a triple modular redundant architecture that will enhance the robustness/fault tolerance of the design with respect to equipment failures

  4. Laser target fabrication, structure and method for its fabrication

    Science.gov (United States)

    Farnum, Eugene H.; Fries, R. Jay

    1985-01-01

    The disclosure is directed to a laser target structure and its method of fabrication. The target structure comprises a target plate containing an orifice across which a pair of crosshairs are affixed. A microsphere is affixed to the crosshairs and enclosed by at least one hollow shell comprising two hemispheres attached together and to the crosshairs so that the microsphere is juxtapositioned at the center of the shell.

  5. APT target-blanket fabrication development

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, D.L.

    1997-06-13

    Concepts for producing tritium in an accelerator were translated into hardware for engineering studies of tritium generation, heat transfer, and effects of proton-neutron flux on materials. Small-scale target- blanket assemblies were fabricated and material samples prepared for these performance tests. Blanket assemblies utilize composite aluminum-lead modules, the two primary materials of the blanket. Several approaches are being investigated to produce large-scale assemblies, developing fabrication and assembly methods for their commercial manufacture. Small-scale target-blanket assemblies, designed and fabricated at the Savannah River Site, were place in Los Alamos Neutron Science Center (LANSCE) for irradiation. They were subjected to neutron flux for nine months during 1996-97. Coincident with this test was the development of production methods for large- scale modules. Increasing module size presented challenges that required new methods to be developed for fabrication and assembly. After development, these methods were demonstrated by fabricating and assembling two production-scale modules.

  6. FABRICATION AND CHARACTERIZATION OF FAST IGNITION TARGETS

    International Nuclear Information System (INIS)

    HILL, D.W; CASTILLO, E; CHEN, K.C; GRANT, S.E; GREENWOOD, A.L; KAAE, J.L; NIKROO, A; PAGUIO, S.P; SHEARER, C; SMITH, J.N Jr.; STEPHENS, R.B; STEINMAN, D.A; WALL, J.

    2003-09-01

    OAK-B135 Fast ignition is a novel scheme for achieving laser fusion. A class of these targets involves cone mounted CH shells. The authors have been fabricating such targets with shells with a wide variety of diameters and wall thicknesses for several years at General Atomics. In addition, recently such shells were needed for implosion experiments at Laboratory for Laser Energetics (LLE) that for the first time were required to be gas retentive. Fabrication of these targets requires producing appropriate cones and shells, assembling the targets, and characterization of the assembled targets. The cones are produced using micromachining and plating techniques. The shells are fabricated using the depolymerizable mandrel technique followed by micromachining a hole for the cone. The cone and the shell then need to be assembled properly for gas retention and precisely in order to position the cone tip at the desired position within the shell. Both are critical for the fast ignition experiments. The presence of the cone in the shell creates new challenges in characterization of the assembled targets. Finally, for targets requiring a gas fill, the cone-shell assembly needs to be tested for gas retention and proper strength at the glue joint. This paper presents an overview of the developmental efforts and technical issues addressed during the fabrication of fast ignition targets

  7. LIFE Target Fabrication Research Plan Sept 2008

    Energy Technology Data Exchange (ETDEWEB)

    Miles, R; Biener, J; Kucheyev, S; Montesanti, R; Satcher, J; Spadaccini, C; Rose, K; Wang, M; Hamza, A; Alexander, N; Brown, L; Hund, J; Petzoldt, R; Sweet, W; Goodin, D

    2008-11-10

    The target-system for the baseline LIFE fast-ignition target was analyzed to establish a preliminary estimate for the costs and complexities involved in demonstrating the technologies needed to build a prototype LIFE plant. The baseline fast-ignition target upon which this analysis was developed is shown in Figure 1.0-1 below. The LIFE target-system incorporates requirements for low-cost, high throughput manufacture, high-speed, high accuracy injection of the target into the chamber, production of sufficient energy from implosion and recovery and recycle of the imploded target material residue. None of these functions has been demonstrated to date. Existing target fabrication techniques which lead to current 'hot spot' target costs of {approx}$100,000 per target and at a production rate of 2/day are unacceptable for the LIFE program. Fabrication techniques normally used for low-cost, low accuracy consumer products such as toys must be adapted to the high-accuracy LIFE target. This will be challenge. A research program resulting is the demonstration of the target-cycle technologies needed for a prototype LIFE reactor is expected to cost {approx}$51M over the course of 5 years. The effort will result in targets which will cost an estimated $0.23/target at a rep-rate of 20 Hz or about 1.73M targets/day.

  8. Fabrication of implanted $^{22}$Na targets

    CERN Multimedia

    2002-01-01

    A knowledge of the $^{22}$Na(p,$\\gamma$)$^{23}$ Mg reaction rate is of significant astrophysical interest. In order to complete previous studies of this reaction, radioactive $^{22}$Na targets of high purity are required. We ask for support to fabricate these targets via the implantation technique at ISOLDE GPS (off—line mode) using $^{22}$Na nuclides in an Al matrix produced in Nov. 1990 at the PSI (Zürich). The $^{22}$Na nuclides are released and ionized in a surface ionisation source, mass-analyzed at ISOLDE GPS, and implanted in a Ni-Ta backing and a C—foil in a special implantation setup.

  9. Tenth target fabrication specialists` meeting: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Foreman, L.R.; Stark, J.C. [comp.

    1995-11-01

    This tenth meeting of specialists in target fabrication for inertial confinement is unique in that it is the first meeting that was completely unclassified. As a result of the new classification, we were able to invite more foreign participation. In addition to participants from the US, UK, and Canada, representatives from France, Japan, and two Russian laboratories attended, about 115 in all. This booklet presents full papers and poster sessions. Indirect and direct drive laser implosions are considered. Typical topics include: polymer or aluminium or resorcinol/formaldehyde shells, laser technology, photon tunneling microscopy as a characterization tool, foams, coatings, hohlraums, and beryllium capsules. Hydrogen, deuterium, tritium, and beryllium are all considered as fuels.

  10. Tenth target fabrication specialists' meeting: Proceedings

    International Nuclear Information System (INIS)

    Foreman, L.R.; Stark, J.C.

    1995-01-01

    This tenth meeting of specialists in target fabrication for inertial confinement is unique in that it is the first meeting that was completely unclassified. As a result of the new classification, we were able to invite more foreign participation. In addition to participants from the US, UK, and Canada, representatives from France, Japan, and two Russian laboratories attended, about 115 in all. This booklet presents full papers and poster sessions. Indirect and direct drive laser implosions are considered. Typical topics include: polymer or aluminium or resorcinol/formaldehyde shells, laser technology, photon tunneling microscopy as a characterization tool, foams, coatings, hohlraums, and beryllium capsules. Hydrogen, deuterium, tritium, and beryllium are all considered as fuels

  11. Waste drum refurbishment

    International Nuclear Information System (INIS)

    Whitmill, L.J.

    1996-01-01

    Low-carbon steel, radioactive waste containers (55-gallon drums) are experiencing degradation due to moisture and temperature fluctuations. With thousands of these containers currently in use; drum refurbishment becomes a significant issue for the taxpayer and stockholders. This drum refurbishment is a non-intrusive, portable process costing between 1/2 and 1/25 the cost of repackaging, depending on the severity of degradation. At the INEL alone, there are an estimated 9,000 drums earmarked for repackaging. Refurbishing drums rather than repackaging can save up to $45,000,000 at the INEL. Based on current but ever changing WIPP Waste Acceptance Criteria (WAC), this drum refurbishment process will restore drums to a WIPP acceptable condition plus; drums with up to 40% thinning o the wall can be refurbished to meet performance test requirements for DOT 7A Type A packaging. A refurbished drum provides a tough, corrosion resistant, waterproof container with longer storage life and an additional containment barrier. Drums are coated with a high-pressure spray copolymer material approximately .045 inches thick. Increase in internal drum temperature can be held to less than 15 F. Application can be performed hands-on or the equipment is readily adaptable and controllable for remote operations. The material dries to touch in seconds, is fully cured in 48 hours and has a service temperature of -60 to 500 F. Drums can be coated with little or no surface preparation. This research was performed on drums however research results indicate the coating is very versatile and compatible with most any material and geometry. It could be used to provide abrasion resistance, corrosion protection and waterproofing to almost anything

  12. Refurbishing tritium contaminated ion sources

    International Nuclear Information System (INIS)

    Wright, K.E.; Carnevale, R.H.; McCormack, B.E.; Stevenson, T.; Halle, A. von

    1995-01-01

    Extended tritium experimentation on TFTR has necessitated refurbishing Neutral Beam Long Pulse Ion Sources (LPIS) which developed operational difficulties, both in the TFTR Test Cell and later, in the NB Source Refurbishment Shop. Shipping contaminated sources off-site for repair was not permissible from a transport and safety perspective. Therefore, the NB source repair facility was upgraded by relocating fixtures, tooling, test apparatus, and three-axis coordinate measuring equipment; purchasing and fabricating fume hoods; installing exhaust vents; and providing a controlled negative pressure environment in the source degreaser/decon area. Appropriate air flow monitors, pressure indicators, tritium detectors and safety alarms were also included. The effectiveness of various decontamination methods was explored while the activation was monitored. Procedures and methods were developed to permit complete disassembly and rebuild of an ion source while continuously exhausting the internal volume to the TFTR Stack to avoid concentrations of tritium from outgassing and minimize personnel exposure. This paper presents upgrades made to the LPIS repair facility, various repair tasks performed, and discusses the effectiveness of the decontamination processes utilized

  13. Last PS magnet refurbished

    CERN Multimedia

    2009-01-01

    PS Magnet Refurbishment Programme Completed. The 51st and final refurbished magnet was transported to the PS on Tuesday 3 February. The repair and consolidation work on the PS started back in 2003 when two magnets and a busbar connection were found to be faulty during routine high-voltage tests. The cause of the fault was a combination of age and radiation on electrical insulation. After further investigation the decision was taken to overhaul half of the PS’s 100 magnets to reduce the risk of a similar fault. As from 20 February the PS ring will start a five-week test programme to be ready for operation at the end of March.

  14. Target fabrication using laser and spark erosion machining

    International Nuclear Information System (INIS)

    Clement, X.; Coudeville, A.; Eyharts, P.; Perrine, J.P.; Rouillard, R.

    1982-01-01

    Fabrication of laser fusion targets requires a number of special techniques. We have developed both laser and spark erosion machining to produce minute parts of complex targets. A high repetition rate YAG laser at double frequency is used to etch various materials. For example, marks or patterns are often necessary on structured or advanced targets. The laser is also used to thin down plastic coated stalks. A spark erosion system has proved to be a versatile tool and we describe current fabrication processes like cutting, drilling, and ultra precise machining. Spark erosion has interesting features for target fabrication: it is a highly controllable and reproducible technique as well as relatively inexpensive

  15. Targets and processes for fabricating same

    Science.gov (United States)

    Adams, Jesse D; Malekos, Steven; Le Galloudec, Nathalie; Korgan, Grant; Cowan, Thomas; Sentoku, Yasuhiko

    2016-05-17

    In particular embodiments, the present disclosure provides targets including a metal layer and defining a hollow inner surface. The hollow inner surface has an internal apex. The distance between at least two opposing points of the internal apex is less than about 15 .mu.m. In particular examples, the distance is less than about 1 .mu.m. Particular implementations of the targets are free standing. The targets have a number of disclosed shaped, including cones, pyramids, hemispheres, and capped structures. The present disclosure also provides arrays of such targets. Also provided are methods of forming targets, such as the disclosed targets, using lithographic techniques, such as photolithographic techniques. In particular examples, a target mold is formed from a silicon wafer and then one or more sides of the mold are coated with a target material, such as one or more metals.

  16. Targets and processes for fabricating same

    Science.gov (United States)

    Cowan, Thomas [Dresden, DE; Malekos, Steven [Reno, NV; Korgan, Grant [Reno, NV; Adams, Jesse [Reno, NV; Sentoku, Yasuhiko [Reno, NV; Le Galloudec, Nathalie [Reno, NV; Fuchs, Julien [Paris, FR

    2012-07-24

    In particular embodiments, the present disclosure provides targets including a metal layer and defining a hollow inner surface. The hollow inner surface has an internal apex. The distance between at least two opposing points of the internal apex is less than about 15 .mu.m. In particular examples, the distance is less than about 1 .mu.m. Particular implementations of the targets are free standing. The targets have a number of disclosed shaped, including cones, pyramids, hemispheres, and capped structures. The present disclosure also provides arrays of such targets. Also provided are methods of forming targets, such as the disclosed targets, using lithographic techniques, such as photolithographic techniques. In particular examples, a target mold is formed from a silicon wafer and then one or more sides of the mold are coated with a target material, such as one or more metals.

  17. Foundation helps refurbish buildings

    International Nuclear Information System (INIS)

    Camenzind, B.

    2006-01-01

    This article looks at the activities of the Swiss 'Climate-Cent' foundation, which is helping support the energetic refurbishment of building envelopes. The conditions which have to be fulfilled to receive grants are explained. Work supported includes the replacement of windows and the insulation of roofs and attics as well as outside walls. Details on the financial support provided and examples of projects supported are given. The source of the finance needed to provide such support - a voluntary levy on petrol - and further support provided in certain Swiss cantons is commented on

  18. Laser fusion target fabrication. Status report, 30 April 1974

    International Nuclear Information System (INIS)

    Fries, R.J.; Farnum, E.H.

    1974-11-01

    The laser fusion target fabrication effort at Los Alamos Scientific Laboratory has been successful in producing targets of the general design requested by, and with a range of parameters acceptable to, the theoretical designers and to the laser/target interaction physics experimentalists. Many novel techniques for handling and measuring the properties of various types of hollow microballoons were developed. (U.S.)

  19. Proceedings of the twelfth target fabrication specialists` meeting

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-04-01

    Research in fabrication for inertial confinement fusion (ICF) comprises at least three broad categories: targets for high energy density physics on existing drivers, ignition capsule fabrication, and cryogenic fuel layer formation. The latter two are being pursued primarily for the National Ignition Facility (NIF). Scientists from over 14 laboratories, universities, and businesses contributed over 100 papers on all aspects of ICF target fabrication. The NIF is well along in construction and photos of poured concrete and exposed steel added to the technical excitement. It was clear from the meeting that there has been significant progress toward the fabrication of an ignition target for NIF and that new techniques are resulting in higher quality targets for high energy density research.

  20. Double-shell target fabrication workshop-2016 report

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Y. Morris [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Oertel, John [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Farrell, Michael [General Atomics, San Diego, CA (United States); Baumann, Ted [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Huang, Haibo [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Nikroo, Abbas [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-01-10

    On June 30, 2016, over 40 representatives from Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), General Atomics (GA), Laboratory for Laser Energetics (LLE), Schafer Corporation, and NNSA headquarter attended a double-shell (DS) target fabrication workshop at Livermore, California. Pushered-single-shell (PSS) and DS metalgas platforms potentially have a large impact on programmatic applications. The goal of this focused workshop is to bring together target fabrication scientists, physicists, and designers to brainstorm future PSS and DS target fabrication needs and strategies. This one-day workshop intends to give an overall view of historical information, recent approaches, and future research activities at each participating organization. Five topical areas have been discussed that are vital to the success of future DS target fabrications, including inner metal shells, foam spheres, outer ablators, fill tube assembly, and metrology.

  1. Proceedings of the twelfth target fabrication specialists' meeting

    International Nuclear Information System (INIS)

    1999-01-01

    Research in fabrication for inertial confinement fusion (ICF) comprises at least three broad categories: targets for high energy density physics on existing drivers, ignition capsule fabrication, and cryogenic fuel layer formation. The latter two are being pursued primarily for the National Ignition Facility (NIF). Scientists from over 14 laboratories, universities, and businesses contributed over 100 papers on all aspects of ICF target fabrication. The NIF is well along in construction and photos of poured concrete and exposed steel added to the technical excitement. It was clear from the meeting that there has been significant progress toward the fabrication of an ignition target for NIF and that new techniques are resulting in higher quality targets for high energy density research

  2. Nuclear target foil fabrication for the Romano Event

    International Nuclear Information System (INIS)

    Weed, J.W.; Romo, J.G. Jr.; Griggs, G.E.

    1984-01-01

    The Vacuum Processes Lab, of LLNL's M.E. Dept. - Material Fabrication Division, was requested to provide 250 coated Parylene target foils for a nuclear physics experiment titled the ROMANO Event. Due to the developmental nature of some of the fabrication procedures, approximately 400 coated foils were produced to satisfy the event's needs. The foils were used in the experiment as subkilovolt x-ray, narrow band pass filters, and wide band ultraviolet filters. This paper is divided into three sections describing: (1) nuclear target foil fabrication, (2) Parylene substrate preparation and production, and (3) foil and substrate inspections

  3. Refurbishments of RF systems

    International Nuclear Information System (INIS)

    Baelde, J.L.

    1998-01-01

    This document describes the activities of the R.F. System group during the years 1995-1996 in the frame of the refurbishment of the control system at GANIL accelerator. Modifications concerning the following sub-assemblies are mentioned: 1. voltage standards; 2. link card between the step by step motor control and the local control systems; 3. polarization system; 4. computer software for different operations. Also reported is the installation of ECR 4 source for the CO2. In this period the R2 Regrouping system has been installed, tested and put into operation. Several problems concerning the mechanical installation of the coupling loop and other problems related to the electronics operation were solved. The results obtained with the THI machine are presented

  4. Advanced laser fusion target fabrication research and development proposal

    International Nuclear Information System (INIS)

    Stupin, D.M.; Fries, R.J.

    1979-05-01

    A research and development program is described that will enable the fabrication of 10 6 targets/day for a laser fusion prototype power reactor in 2007. We give personnel and cost estimates for a generalized laser fusion target that requires the development of several new technologies. The total cost of the program between 1979 and 2007 is $362 million in today's dollars

  5. Acidic aqueous uranium electrodeposition for target fabrication

    International Nuclear Information System (INIS)

    Saliba-Silva, A.M.; Oliveira, E.T.; Garcia, R.H.L.; Durazzo, M.

    2013-01-01

    Direct irradiation of targets inside nuclear research or multiple purpose reactors is a common route to produce 99 Mo- 99m Tc radioisotopes. The electroplating of low enriched uranium over nickel substrate might be a potential alternative to produce targets of 235 U. The electrochemistry of uranium at low temperature might be beneficial for an alternative route to produce 99 Mo irradiation LEU targets. Electrodeposition of uranium can be made using ionic and aqueous solutions producing uranium oxide deposits. The performance of uranium electrodeposition is relatively low because a big competition with H 2 evolution happens inside the window of electrochemical reduction potential. This work explores possibilities of electroplating uranium as UO 2 2+ (Uranium-VI) in order to achieve electroplating uranium in a sufficient amount to be commercially irradiated in the future Brazilian RMB reactor. Electroplated nickel substrate was followed by cathodic current electrodeposition from aqueous UO 2 (NO 3 ) 2 solution. EIS tests and modeling showed that a film formed differently in the three tested cathodic potentials. At the lower level, (-1.8V) there was an indication of a double film formation, one overlaying the other with ionic mass diffusion impaired at the interface with nickel substrate as showed by the relatively lower admittance of Warburg component. (author)

  6. High volume fabrication of laser targets using MEMS techniques

    International Nuclear Information System (INIS)

    Spindloe, C; Tomlinson, S; Green, J; Booth, N.; Tolley, M K; Arthur, G; Hall, F; Potter, R; Kar, S; Higginbotham, A

    2016-01-01

    The latest techniques for the fabrication of high power laser targets, using processes developed for the manufacture of Micro-Electro-Mechanical System (MEMS) devices are discussed. These laser targets are designed to meet the needs of the increased shot numbers that are available in the latest design of laser facilities. Traditionally laser targets have been fabricated using conventional machining or coarse etching processes and have been produced in quantities of 10s to low 100s. Such targets can be used for high complexity experiments such as Inertial Fusion Energy (IFE) studies and can have many complex components that need assembling and characterisation with high precision. Using the techniques that are common to MEMS devices and integrating these with an existing target fabrication capability we are able to manufacture and deliver targets to these systems. It also enables us to manufacture novel targets that have not been possible using other techniques. In addition, developments in the positioning systems that are required to deliver these targets to the laser focus are also required and a system to deliver the target to a focus of an F2 beam at 0.1Hz is discussed. (paper)

  7. Refurbishment of hydropower generation plants

    International Nuclear Information System (INIS)

    Kofler, W.

    2001-01-01

    This article presents the factors taken into consideration and the methods used for the management of refurbishment work in the hydropower installations of the TUWAG - a Tyrolean hydropower company in Austria. The technical and financial advantages to be gained from refurbishment are discussed and the requirements placed on the structuring of refurbishment projects are described. Various factors such as plant operation and maintenance, increased returns through better efficiency and cost reduction through lower wear and tear and reduced risk of failure are discussed. Annexes to the article cover monitoring and measurement techniques, the simulation of mechanical and hydraulic conditions, profitability calculations and turbine management

  8. Refurbishment of the LECI

    International Nuclear Information System (INIS)

    Blanc, J. Y.; Cheron, C.

    2001-01-01

    The LECI is a hot laboratory built in Saclay in the early sixties for examinations on fuel rods, with 25 hot cells. Around 1995, a refurbishment programme up to 2004 was decided and started. It includes the renovation of about half of the cells of the existing building and the construction of a new building with about twenty lead-shielded hot cells for mechanical testing. At mid 2001, this paper presents the status of the project and the perspectives for the next years. These modifications aims: -To increase sample preparation and examination capacities on nuclear metals: mainly zirconium, steel and aluminium alloys. -To keep existing P. I. facilities on short P. W. R. fuel rod as support for ramp testing programmes in the nearby Osiris reactor and as support for new cladding development programmes. -To gather in LECI mechanical testing facilities which are up to now located in another facility to be shut down at the end of 2003. Concerning the existing building, most of the planned refurbishment has been performed and 10 cells have been cleaned and 8 of them will be reequipped at the end of 2001: a metallography line with new microscope, hardness testing, periscopes, TEM thin foil and EPMA preparation, two cells for tooling mechanical samples (milling machine, lathe, spark erosion), one cell for clad creep testing on long term storage conditions and a cell with a 250 kN tensile machine. The new building is built, the lead cells will be installed in 2002 and most of the scientific equipment have been ordered. They include: wire erosion machining 3 tensile machines with extensometry, 2 Charpy, different creep and internal pressure machines, autoclaves EPMA and Raman analysis. The schedule is to open this building to irradiated materials ( no fuel except on EPMA) at the end of 2003. Some difficulties such as the public enquires have been successfully overcome, some financial constraints have delayed the project of about one year, and technical difficulties have

  9. Fabrication of laser-target components by semiconductor technology

    International Nuclear Information System (INIS)

    Tindall, W.E.

    1979-01-01

    This paper describes the design and fabrication of a unique silicon substrate with which laser-target components can be mass produced. Different sizes and shapes of gold foils from 50 to 3000 microns in diameter and up to 25 microns thick have been produced with this process since 1976

  10. Energy efficiency improvement target for SIC 34 - fabricated metal products

    Energy Technology Data Exchange (ETDEWEB)

    Byrer, T. G.; Billhardt, C. F.; Farkas, M. S.

    1977-03-15

    A March 15, 1977 revision of a February 15, 1977 document on the energy improvement target for the Fabricated Metal Products industry (SIC 34) is presented. A net energy savings in 1980 of 24% as compared with 1972 energy consumption in SIC 34 is considered a realistic goal. (ERA citation 04:045008)

  11. Refurbishment of industrial buildings

    International Nuclear Information System (INIS)

    Gustafsson, Stig-Inge

    2006-01-01

    When a building is subject for refurbishment, there is a golden opportunity to change its behavior as an energy system. This paper shows the importance of careful investigations of the processes, the climate shield and the heating systems already present in the building before measures are implemented in reality. A case study is presented dealing with a carpentry factory. The building is poorly insulated according to standards today, and initially it was assumed that a better thermal shield would be of vital importance in order to reach optimal conditions. Instead, it is shown that the main problem is the ordinary heating system. This uses steam from a wood chips boiler and the wood chips come from the manufacturing processes. These wood chips are, therefore, a very cheap fuel. The boiler had, during decades of use, slowly degraded into a poor state. Hence, aero-tempers using expensive electricity have been installed to remedy the situation. These use not only expensive kWh but also very expensive kW due to the electricity tariff. It is shown that electricity for heating purposes must be abandoned and further, that this could be achieved at a surprisingly small cost. By stopping a large waste of steam, it was possible to find resources, in the form of unspent money, for further mending the existing heating system. Not only economy but also environmental hazards in the form of CO 2 emissions urges us to abandon electricity and instead use heat from cheap biomass fired boilers. Such equipment saves environment at the same time it saves money

  12. Reactor refurbishment in an outage environment

    International Nuclear Information System (INIS)

    Gowthorpe, P.; Hoare, R.

    2012-01-01

    Reactor life extension has typically been performed during specific refurbishment outages. These outages are long and costly due to the sheer complexity of the scope, not to mention the ever present discovery work. A scope of this size requires a huge labour force to execute, which poses significant challenges. The work is difficult to staff with qualified people able to execute the work smoothly and managing the required labour pool problematic. Cost and time overruns are inevitable in that environment. Reducing the cost and schedule is critical to the long term viability of reactor refurbishment projects. With planning, the total cost of the refurbishment can be reduced by managing the inspection and repairs during normal outages. Identifying what activities need to be done each outage for the life of the reactor and bringing the latest technology can make this viable. Tightly planned outages with a small well trained labour force will go a long way to reducing costs. The suite of services and tooling available to the utilities to manage their reactor integrity has improved significantly in recent years and continues to evolve. New feeder inspection technologies can provide improved inspection results for the complex feeder geometry. These improvements lead to more accurate wear rates and better predictions of component life. Feeders that need replacement based on improved inspection techniques can be replaced systematically during regular outages rather than specific refurbishment outages. Targeting areas rather than entire feeders reduces time, dose and cost. In cases where feeder replacement isn't feasible or where unpredicted wear is found, a feeder weld overlay process can be used. To manage the reactor work, new data systems are under development that allow for effective tracking of each activity performed and outcomes in a single package. (author)

  13. Radiation protection aspects of AECL's retube/refurbishment projects

    International Nuclear Information System (INIS)

    Zhuang, Y.; Boss, C.R.; Pontikakis, N.

    2007-01-01

    In contrast to the construction of a new nuclear reactor, Retube/Refurbishment of nuclear reactors that have been in operation for many years will involve fabrication of a new core in a radiation environment. Careful planning of the radiation protection (RP) program is crucial to ensure the protection of workers and the environment, and the success of the projects. This paper describes the key RP activities currently underway in AECL's Retube/Refurbishment projects, covering RP during retubing tooling and system designs, retubing work planning, retubing operation, and waste transfer and management. The discussion will focus on RP initiatives from engineering design aspects of the projects. (author)

  14. Design and Fabrication of Titanium Target for Portable Neutron Generator

    International Nuclear Information System (INIS)

    Lee, Cheol Ho; Oh, Byunghoon; Chang, Daesik; Jang, Dohyun; In Sang Yeol; Park, Jaewon; Hong, Kwangpyo

    2014-01-01

    For the neutron generator to produce a neutron flux of the above order, a target that produces fast neutrons in the generator plays an important role, and the target is used and applied to develop the generator due to its simplicity and inexpensive. Making suitable targets for neutron production, especially mono-energy neutrons, has always been of interest. These targets have been used for neutron production reaction studies, calibration of detectors, and neutron therapy. Different studies have been carried out on deuterium and tritium for making solid targets to produce mono-energy neutron from D-D and D-T reactions. A lot of investigations have been carried out on solid target properties such as lifetime, thermal stability, neutron yield, and energy. Vaporized zirconium and titanium layers on a high thermal conductivity substrate (Cu, Mo, Ag) have been used as deuterium and tritium absorbing metals. The density of titanium is smaller than zirconium and the range of charged particles in the titanium targets is more than that in zirconium targets. Thus, titanium targets have more neutron yield than zirconium targets in a low energy beam and titanium is usually used to make a target. The titanium target was designed and simulated to determine the suitable thickness of the target. As a result of the simulation, the target was fabricated to generate fast neutrons by the reaction. The thickness of the target was measured using a profiler. The thickness of the two targets is 2.108 and 2.190 μm. The target will be applied to produce neutrons in a neutron generator

  15. COST-EFFECTIVE TARGET FABRICATION FOR INERTIAL FUSION ENERGY

    International Nuclear Information System (INIS)

    GOODIN, D.T; NOBILE, A; SCHROEN, D.G; MAXWELL, J.L; RICKMAN, W.S

    2004-03-01

    A central feature of an Inertial Fusion Energy (IFE) power plant is a target that has been compressed and heated to fusion conditions by the energy input of the driver. The IFE target fabrication programs are focusing on methods that will scale to mass production, and working closely with target designers to make material selections that will satisfy a wide range of required and desirable characteristics. Targets produced for current inertial confinement fusion experiments are estimated to cost about $2500 each. Design studies of cost-effective power production from laser and heavy-ion driven IFE have found a cost requirement of about $0.25-0.30 each. While four orders of magnitude cost reduction may seem at first to be nearly impossible, there are many factors that suggest this is achievable. This paper summarizes the paradigm shifts in target fabrication methodologies that will be needed to economically supply targets and presents the results of ''nth-of-a-kind'' plant layouts and concepts for IFE power plant fueling. Our engineering studies estimate the cost of the target supply in a fusion economy, and show that costs are within the range of commercial feasibility for laser-driven and for heavy ion driven IFE

  16. LBNF 1.2 MW TARGET: CONCEPTUAL DESIGN & FABRICATION

    Energy Technology Data Exchange (ETDEWEB)

    Crowley, Cory F. [Fermilab; Ammigan, K. [Fermilab; Anderson, K. [Fermilab; Hartsell, B. [Fermilab; Hurh, P. [Fermilab; Hylen, J. [Fermilab; Zwaska, R. [Fermilab

    2015-06-29

    Fermilab’s Long-Baseline Neutrino Facility (LBNF) will utilize a modified design based on the NuMI low energy target that is reconfigured to accommodate beam operation at 1.2 MW. Achieving this power with a graphite target material and ancillary systems originally rated for 400 kW requires several design changes and R&D efforts related to material bonding and electrical isolation. Target cooling, structural design, and fabrication techniques must address higher stresses and heat loads that will be present during 1.2 MW operation, as the assembly will be subject to cyclic loads and thermal expansion. Mitigations must be balanced against compromises in neutrino yield. Beam monitoring and subsystem instrumentation will be updated and added to ensure confidence in target positioning and monitoring. Remote connection to the target hall support structure must provide for the eventual upgrade to a 2.4 MW target design, without producing excessive radioactive waste or unreasonable exposure to technicians during reconfiguration. Current designs and assembly layouts will be presented, in addition to current findings on processes and possibilities for prototype and final assembly fabrication.

  17. LBNF 1.2 MW Target: Conceptual Design & Fabrication

    Energy Technology Data Exchange (ETDEWEB)

    Crowley, C. [Fermilab; Ammigan, K. [Fermilab; Anderson, K. [Fermilab; Hartsell, B. [Fermilab; Hurh, P. [Fermilab; Hylen, J. [Fermilab; Zwaska, R. [Fermilab

    2015-06-01

    Fermilab’s Long-Baseline Neutrino Facility (LBNF) will utilize a modified design based on the NuMI low energy target that is reconfigured to accommodate beam operation at 1.2 MW. Achieving this power with a graphite target material and ancillary systems originally rated for 400 kW requires several design changes and R&D efforts related to material bonding and electrical isolation. Target cooling, structural design, and fabrication techniques must address higher stresses and heat loads that will be present during 1.2 MW operation, as the assembly will be subject to cyclic loads and thermal expansion. Mitigations must be balanced against compromises in neutrino yield. Beam monitoring and subsystem instrumentation will be updated and added to ensure confidence in target positioning and monitoring. Remote connection to the target hall support structure must provide for the eventual upgrade to a 2.4 MW target design, without producing excessive radioactive waste or unreasonable exposure to technicians during reconfiguration. Current designs and assembly layouts will be presented, in addition to current findings on processes and possibilities for prototype and final assembly fabrication.

  18. Sustainability Potentials of Housing Refurbishment

    Directory of Open Access Journals (Sweden)

    Behzad Sodagar

    2013-03-01

    Full Text Available The benefits of choosing refurbishment over new build have recently been brought into focus for reducing environmental impacts of buildings. This is due to the fact that the existing buildings will comprise the majority of the total building stocks for years to come and hence will remain responsible for the majority of greenhouse gas emissions from the sector. This paper investigates the total potentials of sustainable refurbishment and conversion of the existing buildings by adopting a holistic approach to sustainability. Life Cycle Assessment (LCA and questionnaires have been used to analyse the environmental impact savings (Co2e, improved health and well-being, and satisfaction of people living in refurbished homes. The results reported in the paper are based on a two year externally funded research project completed in January 2013.

  19. Concepts for fabrication of inertial fusion energy targets

    Energy Technology Data Exchange (ETDEWEB)

    Nobile, A. (Arthur), Jr.; Hoffer, J. K. (James K.); Gobby, P. L. (Peter L.); Steckle, W. P. (Warren P.), Jr.; Goodin, D. T. (Daniel T.); Besenbruch, G. E. (Gottfried E.); Schultz, K. R. (Kenneth R.)

    2001-01-01

    Future inertial fusion energy (IFE) power plants will have a Target Fabrication Facility (TFF) that must produce approximately 500,000 targets per day. To achieve a relatively low cost of electricity, the cost to produce these targets will need to be less than approximately $0.25 per target. In this paper the status on the development of concepts for a TFF to produce targets for a heavy ion fusion (HIF) reactor, such as HYLIFE II, and a laser direct drive fusion reactor such as Sombrero, is discussed. The baseline target that is produced in the HIF TFF is similar to the close-coupled indirect drive target designed by Callahan-Miller and Tabak at Lawrence Livermore Laboratory. This target consists of a cryogenic hohlraum that is made of a metal case and a variety of metal foams and metal-doped organic foams. The target contains a DT-filled CH capsule. The baseline direct drive target is the design developed by Bodner and coworkers at Naval Research Laboratory. HIF targets can be filled with DT before or after assembly of the capsule into the hohlraum. Assembly of targets before filling allows assembly operations to be done at room temperature, but tritium inventories are much larger due to the large volume that the hohlraum occupies in the fill system. Assembly of targets cold after filling allows substantial reduction in tritium inventory, but this requires assembly of targets at cryogenic temperature. A model being developed to evaluate the tritium inventories associated with each of the assembly and fill options indicates that filling targets before assembling the capsule into the hohlraum, filling at temperatures as high as possible, and reducing dead-volumes in the fill system as much as possible offers the potential to reduce tritium inventories to acceptable levels. Use of enhanced DT ice layering techniques, such as infrared layering can reduce tritium inventories significantly by reducing the layering time and therefore the number of capsules being layered

  20. Information management data base for fusion target fabrication processes

    International Nuclear Information System (INIS)

    Reynolds, J.

    1983-01-01

    A computer-based data management system has been developed to handle data associated with target fabrication processes including glass microballoon characterization, gas filling, materials coating, and storage locations. The system provides automatic data storage and computation, flexible data entry procedures, fast access, automated report generation, and secure data transfer. It resides on a CDC CYBER 175 computer and is compatible with the CDC data base language Query Update, but is based on custom fortran software interacting directly with the CYBER's file management system. The described data base maintains detailed, accurate, and readily available records of fusion targets information

  1. Fabrication and characterization of cryogenic targets for inertial confinement fusion

    International Nuclear Information System (INIS)

    Rieger, H.; Kim, K.

    1979-08-01

    A new technique has been developed which is capable of fabricating uniform cryogenic targets for use in inertial confinement fusion. The essence of the technique is to directly wet a target with a cold helium gas jet, which results in freezing of the DT mixture contained in the target. A controlled amount of current is pulsed through a heater wire surrounding the target, giving rise to fast evaporation and refreezing of the DT-condensate into a uniform layer. Experiments, which have been performed with D 2 -filled glass microshells, successfully produce uniform layers of both liquid and solid D 2 inside the glass shells. A set of data illustrating the technique is presented and analyzed

  2. Powder Metallurgy Fabrication of Molybdenum Accelerator Target Disks

    Energy Technology Data Exchange (ETDEWEB)

    Lowden, Richard Andrew [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kiggans Jr., James O. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Nunn, Stephen D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Parten, Randy J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-07-01

    Powder metallurgy approaches for the fabrication of accelerator target disks are being examined to support the development of Mo-99 production by NorthStar Medical Technologies, LLC. An advantage of powder metallurgy is that very little material is wasted and, at present, dense, quality parts are routinely produced from molybdenum powder. The proposed targets, however, are thin wafers, 29 mm in diameter with a thickness of 0.5 mm, with very stringent dimensional tolerances. Although tooling can be machined to very high tolerance levels, the operations of powder feed, pressing and sintering involve complicated mechanisms, each of which affects green density and shrinkage, and therefore the dimensions and shape of the final product. Combinations of powder morphology, lubricants and pressing technique have been explored to produce target disks with minimal variations in thickness and little or no distortion. In addition, sintering conditions that produce densities for optimum target dissolvability are being determined.

  3. Inertial Confinement Fusion Target Component Fabrication and Technology Development report

    International Nuclear Information System (INIS)

    Steinman, D.

    1994-03-01

    On December 30, 1990, the US Department of Energy entered into a contract with General Atomics (GA) to be the Inertial Confinement Fusion Target Component Fabrication and Technology Development Support contractor. This report documents the technical activities which took place under this contract during the period of October 1, 1992 through September 30, 1993. During this period, GA was assigned 18 tasks in support of the Inertial Confinement Fusion program and its laboratories. These tasks included ''Capabilities Activation'' and ''Capabilities Demonstration'' to enable us to begin production of glass and composite polymer capsules. Capsule delivery tasks included ''Small Glass Shell Deliveries'' and ''Composite Polymer Capsules'' for Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory (LANL). We also were asked to provide direct ''Onsite Support'' at LLNL and LANL. We continued planning for the transfer of ''Micromachining Equipment from Rocky Flats'' and established ''Target Component Micromachining and Electroplating Facilities'' at GA. We fabricated over 1100 films and filters of 11 types for Sandia National Laboratory and provided full-time onsite engineering support for target fabrication and characterization. We initiated development of methods to make targets for the Naval Research Laboratory. We investigated spherical interferometry, built an automated capsule sorter, and developed an apparatus for calorimetric measurement of fuel fill for LLNL. We assisted LANL in the ''Characterization of Opaque b-Layered Targets.'' We developed deuterated and UV-opaque polymers for use by the University of Rochester's Laboratory for Laser Energetics (UR/LLE) and devised a triple-orifice droplet generator to demonstrate the controlled-mass nature of the microencapsulation process

  4. Possible refurbishment of Point Lepreau

    International Nuclear Information System (INIS)

    White, R.M.; Groom, S.H.; Thompson, P.D.; Barclay, J.M.; Allen, P.J.

    2001-01-01

    In February 2000, the NB Power Board of Directors approved Phase one of a project to produce a business case including a detailed scope and estimate associated with the possible refurbishment of the Point Lepreau Generating Station (PLGS). The Preliminary plan for refurbishment projects an 18-month outage starting as early as the spring of 2006. If the station were to be refurbished, then it would be run for another 25 to 30 years. The decision on whether or not to refurbish PLGS has not been made and is not expected until the summer of 2002. The results of the first phase of the project will be used to prepare a detailed business case that will be presented to the NB Power board of directors in January of 2002. At that time a decision will be made as to whether to refurbish the unit, or obtain other means of replacing the energy produced by PLGS. The station currently produces about a third of the power generated within the province. If the business case is approved, all-380 Pressure Tubes and Calandria Tubes, along with their related End Fittings and Feeders would be replaced. This material would be stored in new storage vaults to be constructed at the existing on-site Waste Management Facility. Replacement of other station components will be performed as required, as determined from the results of a comprehensive Plant Condition Assessment. The condition assessments build on work done under the Plant Life Management Program. Point Lepreau Generating Station has operated well since start of commercial operation in early 1983. With a lifetime capacity factor of about 84% (up to the end of 2000), it has proven to be an economic and environmentally sound electricity provider. The station has also had a significant positive economic impact in Southern New Brunswick, employing over 600 people. However the Pressure Tubes and Feeders are nearing the point in time in which they will exceed their fitness for service criteria. Although tubes can be replaced on an

  5. Possible refurbishment of Point Lepreau

    International Nuclear Information System (INIS)

    White, R.M.; Groom, S.H.; Thompson, P.D.; Barclay, J.M.; Allen, P.J.

    2001-01-01

    In February 2000, the NB Power Board of Directors approved Phase one of a project to produce a business case including a detailed scope and estimate associated with the possible refurbishment of the Point Lepreau Generating Station (PLGS). The Preliminary plan for refurbishment projects an 18-month outage starting as early as the spring of 2006. If the station were to be refurbished, then it would be run for another 25 to 30 years. The decision on whether or not to refurbish PLGS has not been made and is not expected until the summer of 2002. The results of the first phase of the project will be used to prepare a detailed business case that will be presented to the NB Power board of directors in January of 2002. At that time a decision will be made as to whether to refurbish the unit, or obtain other means of replacing the energy produced by PLGS. The station currently produces about a third of the power generated within the province. If the business case is approved, all-380 Pressure Tubes and Calandria Tubes, along with their related End Fittings and Feeders would be replaced. This material would be stored in new storage vaults to be constructed at the existing on-site Waste Management Facility. Replacement of other station components will be performed as required, as determined from the results of a comprehensive Plant Condition Assessment. The condition assessments build on work done under the Plant Life Management Program. Point Lepreau Generating Station has operated well since start of commercial operation in early 1983. With a lifetime capacity factor of about 84% (up to the end of 2000), it has proven to be an economic and environmentally sound electricity provider. The station has also had a significant positive economic impact in Southern New Brunswick, employing over 600 people. However the Pressure Tubes and Feeders are nearing the point in time in which they will exceed their fitness for service criteria. Although tubes can be replaced on an

  6. Addressing key science and technology issues for IFE chambers, target fabrication and target injection

    International Nuclear Information System (INIS)

    Meier, W.R.; Goodin, D.T.; Nobile, A.

    2003-01-01

    Significant progress has been made in the development of high repetition rate chambers, target fabrication and injection for inertial fusion energy (IFE) for both heavy ion and laser drivers. Research is being conducted in a coordinated manner by national laboratories, universities and industry. This paper provides an overview of U.S. research activities and discusses how interface considerations (such as beam propagation and target survival during injection) impact design choices. (author)

  7. Advances in target design and fabrication for experiments on NIF

    Directory of Open Access Journals (Sweden)

    Obrey K.

    2013-11-01

    Full Text Available The ability to build target platforms for National Ignition Facility (NIF is a key feature in LANL's (Los Alamos National Laboratory Target Fabrication Program. We recently built and manufactured the first LANL targets to be fielded on NIF in March 2011. Experiments on NIF require precision component manufacturing and accurate knowledge of the materials used in the targets. The characterization of foams and aerogels, the Be ignition capsule, and machining unique components are of main material focus. One important characterization metric the physics' have determined is that the knowledge of density gradients in foams is important. We are making strides in not only locating these density gradients in aerogels and foams as a result of how they are manufactured and machined but also quantifying the density within the foam using 3D confocal micro x-ray fluorescence (μXRF imaging and 3D x-ray computed tomography (CT imaging. In addition, collaborative efforts between General Atomics (GA and LANL in the characterization of the NIF Ignition beryllium capsule have shown that the copper in the capsule migrates radially from the capsule center.

  8. Energy efficiency improvement target for SIC 34 - fabricated metal products. Revised target support document

    Energy Technology Data Exchange (ETDEWEB)

    Byrer, T. G.; Billhardt, C. F.; Farkas, M. S.

    1977-02-15

    In accordance with section 374 of the Energy Policy and Conservation Act (EPCA), Pub. L. 94-163, the Federal Energy Administration (FEA) proposed industrial energy efficiency improvement targets for the ten most energy-consumptive manufacturing industries in the U.S. Following public hearings and a review of the comments made, the final targets for Fabricated Metal Products (SIC 34) were established and are described. Using 1972 data on the energy consumed to produce specific metal products, it was concluded that a 24% reduction in energy consumption for SIC 34 is a viable goal for achievement by 1980. (ERA citation 04:045006)

  9. LMZ experience in refurbishment of hydroturbine equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sotnikov, Anatoly A. [LMZ, St. Petersburg (Russian Federation). Div. of Hydraulic Machine

    2000-07-01

    AO LMZ experience in refurbishment of hydroturbine equipment is generalized. Hydraulic turbines of many power stations having been in service of more than 30 years need rehabilitation and modernization. As a rule, the following problems are solved in the process of refurbishment works: increase of turbine efficiency and output, ensuring of reliable operation of the equipment during the next length of life, ensuring the environmental safety of the equipment, furnishing of the power station with up to date automatic control systems. The process of refurbishment used by LMZ is described. The examples of refurbishment are given. (author)

  10. Model for Refurbishment of Heritage Buildings

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn

    2014-01-01

    the Heritage Agency, the Danish Working Environment Authority and the owner as a team cooperated in identifying feasible refurbishments. In this case, the focus centered on restoring and identifying potential energy savings and deciding on energy upgrading measures for the listed complex. The refurbished...... with the requirements for the use of the building. The model focuses on the cooperation and dialogue between authorities and owners, who refurbish heritage buildings. The developed model was used for the refurbishment of the listed complex, Fæstningens Materialgård. Fæstningens Materialgård is a case study where...

  11. Point Lepreau refurbishment - update 5

    International Nuclear Information System (INIS)

    White, R.M.; Eagles, E.R.; Hickman, C.N.; Baker, R.; Thompson, P.D.; Howieson, J.Q.; Ichiyen, N.

    2005-01-01

    NB Power Nuclear is planning to conduct a 18-month maintenance outage of the Point Lepreau Generating Station (PLGS) beginning in April 2008. The major activity would be the replacement of all 380 Fuel Channel and Calandria Tube assemblies and connecting feeder pipes. This activity is referred to as Retube. NB Power Nuclear would also take advantage of this outage to conduct a number of repairs, replacements, inspection and upgrades (such as rewinding or replacing the generator, replacement of shutdown system trip computers, replacement of certain valves and expansion joints, inspection of systems not normally accessible, etc.). These collective activities are referred to as Refurbishment. This would allow the station to operate for an additional 25 to 30 years. The scope or the project was determined [mm the outcome of a two year study involving a detailed condition assessment of the station which examined Issues relating to ageing and obsolescence, along with a detailed review or Safety and Licensing issues associated with extended operation. The Refurbishment outage would be preceded by a detailed Engineering Project Phase that would: Finalize details of the Retube process including modeling, tooling development, site facilities and training of personnel. Perform necessary engineering activities related to design modifications. Construct the new waste storage structures to house Retube Waste and other additional waste storage structures for the extended life of the station. Setup necessary temporary construction facilities (offices, storage areas, change moms, decontamination an maintenance areas) to support Retube. Procure equipment and components. Perform detailed outage planning. Initiate development of detailed commissioning as well as lay-up, monitoring and return to service procedures. At the present time, the NB Power Nuclear Board of Directors and the New Brunswick Provincial government are reviewing a proposal for a lease arrangement from Bruce Power

  12. Space Telescope maintenance and refurbishment

    Science.gov (United States)

    Trucks, H. F.

    1983-01-01

    The Space Telescope (ST) represents a new concept regarding spaceborne astronomical observatories. Maintenance crews will be brought to the orbital worksite to make repairs and replace scientific instruments. For major overhauls the telescope can be temporarily returned to earth with the aid of the Shuttle. It will, thus, be possible to conduct astronomical studies with the ST for two decades or more. The five first-generation scientific instruments used with the ST include a wide field/planetary camera, a faint object camera, a faint object spectrograph, a high resolution spectrograph, and a high speed photometer. Attention is given to the optical telescope assembly, the support systems module, aspects of mission and science operations, unscheduled maintenance, contingency orbital maintenance, planned on-orbit maintenance, ground maintenance, ground refurbishment, and ground logistics.

  13. Research reactor modernization and refurbishment

    International Nuclear Information System (INIS)

    2009-08-01

    Many recent, high profile research reactor unplanned shutdowns can be directly linked to different challenges which have evolved over time. The concept of ageing management is certainly nothing new to nuclear facilities, however, these events are highlighting the direct impact unplanned shutdowns at research reactors have on various stakeholders who depend on research reactor goods and services. Provided the demand for these goods and services remains strong, large capital projects are anticipated to continue in order to sustain future operation of many research reactors. It is within this context that the IAEA organized a Technical Workshop to launch a broader Agency activity on research reactor modernization and refurbishment (M and R). The workshop was hosted by the operating organization of the HOR Research Reactor in Delft, the Netherlands, in October 2006. Forty participants from twenty-three countries participated in the meeting: with representation from Africa, Asia Pacific, Eastern Europe, North America, South America and Western Europe. The specific objectives of this workshop were to present facility reports on completed, existing and planned M and R projects, including the project objectives, scope and main characteristics; and to specifically report on: - the project impact (planned or actual) on the primary and key supporting motivation for the M and R project; - the project impact (planned or actual) on the design basis, safety, and/or regulatory-related reports; - the project impact (planned or actual) on facility utilization; - significant lessons learned during or following the completion of M and R work. Contributions from this workshop were reviewed by experts during a consultancy meeting held in Vienna in December 2007. The experts selected final contributions for inclusion in this report. Requests were also distributed to some authors for additional detail as well as new authors for known projects not submitted during the initial 2006 workshop

  14. Laser based refurbishment of steel mill components

    CSIR Research Space (South Africa)

    Kazadi, P

    2006-03-01

    Full Text Available Laser refurbishment capabilities were demonstrated and promising results were obtained for repair of distance sleeves, foot rolls, descaler cassette, idler rolls. Based on the cost projections and the results of the in-situ testing, components which...

  15. Energetic Refurbishment of Historic Brick Buildings

    DEFF Research Database (Denmark)

    Zagorskas, Jurgis; Mykolas Paliulis, Grazvydas; Burinskiene, Marija

    2013-01-01

    Building standards for energy effectiveness are increasing constantly and the market follows these changes by constructing new buildings in accordance with standards and refurbishment of the existing housing stock. Comprehensive trends in European construction market show tremendous increase...

  16. Refurbishment of JMTR pure water facility

    International Nuclear Information System (INIS)

    Asano, Norikazu; Hanakawa, Hiroki; Kusunoki, Hidehiko; Satou, Shinichi

    2012-05-01

    In the refurbishment of JMTR, facilities were classified into which (1) were all updated, (2) were partly updated, and (3) were continuance used by the considerations of the maintenance history, the change parts availability and the latest technology. The JMTR pure water facility was classified into all updated facility based on the consideration. The Update construction was conducted in between FY2007 and FY2008. The refurbishment of JMTR pure water facility is summarized in this report. (author)

  17. Role of Fabrication on Materials Compatibility in APT Target/Blanket

    International Nuclear Information System (INIS)

    Iyer, N.; Louthan, M.R. Jr.; Dunn, K.; Fisher, D.L.

    1998-09-01

    This paper summarizes several of the options associated with the fabrication of selected target/blanket components. In addition, the materials characterization technologies required to validate these components performance is presented

  18. The fabrication techniques of Z-pinch targets. Techniques of fabricating self-adapted Z-pinch wire-arrays

    International Nuclear Information System (INIS)

    Qiu Longhui; Wei Yun; Liu Debin; Sun Zuoke; Yuan Yuping

    2002-01-01

    In order to fabricate wire arrays for use in the Z-pinch physical experiments, the fabrication techniques are investigated as follow: Thickness of about 1-1.5 μm of gold is electroplated on the surface of ultra-fine tungsten wires. Fibers of deuterated-polystyrene (DPS) with diameters from 30 to 100 microns are made from molten DPS. And two kinds of planar wire-arrays and four types of annular wire-arrays are designed, which are able to adapt to the variation of the distance between the cathode and anode inside the target chamber. Furthermore, wire-arrays with diameters form 5-24 μm are fabricated with tungsten wires, respectively. The on-site test shows that the wire-arrays can self-adapt to the distance changes perfectly

  19. Double-shell inertial confinement fusion target fabrication

    International Nuclear Information System (INIS)

    Hatcher, C.W.; Lorensen, L.E.; Weinstein, B.W.

    1980-01-01

    First generation hemishells, from which spherical shells are constructed, were fabricated by micromachining coated mandrels and by molding. The remachining of coated mandrels are described in detail. Techniques were developed for coating the microsized mandrels with polymeric and metallic materials by methods including conformal coating, vapor deposition, plasma polymerization and thermoforming. Micropositioning equipment and bonding techniques have also been developed to assemble the hemishells about a fuel pellet maintaining a spherical concentricity of better than 2 μm and voids in the hemishell bonding line of a few hundred angstroms or less

  20. Point Lepreau refurbishment: plant condition assessment

    International Nuclear Information System (INIS)

    Allen, P.J.; Soulard, M.R.; David, F.; Clefton, G.; Weeks, R.

    2001-01-01

    New Brunswick Power (NB Power) has initiated a study into the refurbishment of the Point Lepreau Generating Station, with the objective to extend plant operation another 25 to 30 years. The end product of this study will be a business case that compares the costs of refurbishing Point Lepreau with costs of alternate means of generation. The Project Execution Plan and business case are being developed by an integrated team of AECL, NB Power and subcontractor staff under the project management of AECL. The refurbishment scope will include replacement of the pressure tubes, calandria tubes and part of the feeder piping. Planning of these replacements is part of the refurbishment study work. Planning is also underway for the environmental, safety and licensing issues that would need to be addressed to ensure future operation of the unit. In addition to these studies, a systematic review of the plant has been carried out to determine what other equipment refurbishment or replacement will be required due to ageing or obsolescence of plant equipment. This Plant Condition Assessment (PCA) follows a highly structured approach to ensure consistency. This paper presents an overview of the engineering process and the main findings from the work. (author)

  1. Rapid fabrication and characterization of sine wave targets

    International Nuclear Information System (INIS)

    Day, R.D.; Armijo, E.; Gobby, P.; Hatch, D.; Rivera, G.; Salzer, L.; Townsend, J.

    1997-01-01

    The effect of surface perturbations on Inertial Confinement Fusion target performance is currently being researched at Los Alamos National Laboratory (LANL). These perturbations can cause hydrodynamic instabilities which in turn reduce the targets' yield. To systematically measure the growth of these instabilities requires targets to be produced which have perturbations of a known amplitude and spatial frequency. The authors have recently assembled hardware onto one of their diamond turning lathes which enables them to machine and measure these sine waves in about 15 minutes. This is a significant reduction in time from the two and one half hours required by the previous method. This paper discusses the hardware, how it works, and how well the system is working for them to produce these targets

  2. Fabrication of 94Zr thin target for RDM lifetime measurement

    International Nuclear Information System (INIS)

    Gupta, Chandan Kumar; Rohilla, Aman; Chamoli, S.K.; Abhilash, S.R.; Kabiraj, D.; Singh, R.P.; Mehta, D.

    2013-01-01

    The aim of the activity was to make a thin target of isotopically enriched 94 Zr for lifetime measurement experiment to be done with the plunger setup at the Inter University Accelerator Center (IUAC) Delhi

  3. Reactor refurbishment options for a changing climate

    Energy Technology Data Exchange (ETDEWEB)

    McNeish, D. [Bruce Power, Tiverton, Ontario (Canada)

    2012-07-01

    As the industry looks ahead to another generation of reactor refurbishment, it is acknowledged that the traditional way of Retubing a reactor is a daunting prospect for our investors and stakeholders. Innovations are required to mitigate the long downtime and large one-time investment associated with previous reactor refurbishments. These can take the shape of improvements to the Retube processes or by fundamentally changing the approach, e.g., calandria/shield tank replacement or partial Retubes. This session presents technical challenges that utilities need help resolving to arrive at a more attractive reactor refurbishment model. This includes issues related to calandria vessel fitness-for-service, the fuel channel replacement process, the feeder replacement process, life extension of fuel channels and feeders and complexities involving interfacing systems. (author)

  4. Reactor refurbishment options for a changing climate

    International Nuclear Information System (INIS)

    McNeish, D.

    2012-01-01

    As the industry looks ahead to another generation of reactor refurbishment, it is acknowledged that the traditional way of Retubing a reactor is a daunting prospect for our investors and stakeholders. Innovations are required to mitigate the long downtime and large one-time investment associated with previous reactor refurbishments. These can take the shape of improvements to the Retube processes or by fundamentally changing the approach, e.g., calandria/shield tank replacement or partial Retubes. This session presents technical challenges that utilities need help resolving to arrive at a more attractive reactor refurbishment model. This includes issues related to calandria vessel fitness-for-service, the fuel channel replacement process, the feeder replacement process, life extension of fuel channels and feeders and complexities involving interfacing systems. (author)

  5. Target fabrication using laser and spark erosion machining

    International Nuclear Information System (INIS)

    Clement, X.; Coudeville, A.; Eyharts, P.; Perrine , J.P.; Rouillard, R.

    1981-11-01

    Lasers and E.D.M. (electrical discharge machining) are both extremely useful tools for machining the small targets needed in inertial confinement studies. Lasers are currently used in a wide range of target problems and it appears that E.D.M. has a still wider range of applications for plane and spherical targets. The problems of material deformation and tool breaking are practically eliminated as the electrode and the machined part are not in mechanical contact. In comparison with laser micromachining E.D.M. offers: larger versatility with the possibility of new developments and applications; higher production speed for thin conducting materials; lower initial and operating costs; the processes are well controlled, reproducible and can be easily automated; the operation is safe without the dangers associted with lasers

  6. An Overview of the Target Fabrication Operations at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    Hibbard, R L; Bono, M J

    2005-01-01

    The Target Engineering team at Lawrence Livermore National Laboratory (LLNL) builds precision laser targets for the National Ignition Facility (NIF) and the Omega Laser in Rochester, NY, and other experimental facilities. The physics requirements demand precision in these targets, which creates a constant need for innovative manufacturing processes. As experimental diagnostics improve, there is greater demand for precision in fabrication, assembly, metrology, and documentation of as-built targets. The team specializes in meso-scale fabrication with core competencies in diamond turning, assembly, and metrology. Figure 1 shows a typical diamond turning center. The team builds over 200 laser targets per year in batches of five to fifteen targets. Thus, all are small-lot custom builds, and most are novel designs requiring engineering and process development. Component materials are metals, polymers and low density aerogel foams. Custom fixturing is used to locate parts on the Diamond Turning Machines (DTM) and assembly stations. This ensures parts can be repeatably located during manufacturing operations. Most target builds involve a series of fabricating one surface with features and then relocating the components on another fixture to finish the opposite side of the component. These components are then assembled to complete multiple-component targets. These targets are typically built one at a time. Cost and efficiency are issues with production of targets, and the team is developing batch processing techniques to meet precision target specifications and cost goals. Three example target builds will highlight some of the fabrication and material issues faced at LLNL. A low temperature Rayleigh Taylor target shows how multiple precision targets can be fabricated out of a single large disk. The ignition double shell targets highlight the required manufacturing complexity. A low density aerogel target highlights some material handling and assembly issues. The metrology

  7. Status of the BR2 refurbishment programme

    International Nuclear Information System (INIS)

    Koonen, E.

    1995-01-01

    The operation of the BR2 reactor with its second beryllium matrix is foreseen up to mid-1995. A refurbishment programme has been established in order to allow for future operation during at least ten years. Recently a positive decision to effectively carry out this programme has been taken. The refurbishment action plan follows from a general assessment of the different systems of BR2, with respect to their actual status, the operational experience and the evolution of safety standards and criteria. Ageing considerations were of uppermost importance in those assessments, not only to assure safety of future operation, but also to guarantee future availability and reliability. (orig.)

  8. Reactor protection system refurbishment at Paks

    International Nuclear Information System (INIS)

    Hetzmann, A.; Turi, T.

    1997-01-01

    The history and the milestones of the reactor protection system refurbishment are outlined. During the preparation phase of the refurbishment project, detailed requirements have been set up and specific technical solutions developed. The structure of the project documents prepared during these activities is shown in a figure. The life cycle of the project was divided into four phases: the preparatory phase; the design and manufacturing phase; the installation and commissioning phase; and the operation phase. For all four Paks units a time schedule for implementation was set up. The licensing process is dealt with; the principal license was issued in June 1996. (A.K.)

  9. Fabrication of cryogenic inertial-confinement-fusion targets using target free-fall technique. Report No. 2-82

    International Nuclear Information System (INIS)

    Kim, K.; Murphy, M.J.

    1982-04-01

    Techniques for fabricating cryogenic inertial confinement fusion targets (i.e., spherical shells containing a uniform layer of DT ice) are investigated using target free-fall concept. Detection and characterization of the moving targets are effected by optoelectronic means, of which the principal is an RF ac-interferometer. This interferometer system demonstrates, for the first time, the speed capabilities of the phase-modulation ac-interferometry. New techiques developed for handling, holding, launching, and transporting targets are also described. Results obtained at both room and cryogenic temperatures are presented

  10. Materials processing in space: ICF target fabrication implications

    International Nuclear Information System (INIS)

    Hendricks, C.D.

    1982-01-01

    During the last quarter of 1982, the Novette laser will become operational at Lawrence Livermore National Laboratory. The primary characteristics of the Novette laser are shown. In many ways, the new laser will serve as a proving ground and test bed for the Nova laser which is also under construction and should be operational in early 1985. Tables provide the Nova operational characteristics. The advent of the two new lasers, Novette and Nova, will make it possible to study many new and exciting aspects of laser-target interactions and of many implosion physics experiments which have previously not been possible. Some of the most interesting and exciting work will be the exploration of the parameters critical to the ignition of a significant thermonuclear burn in the deuterium-tritium fuel in the targets

  11. Fabrication of a tantalum-clad tungsten target for KENS

    International Nuclear Information System (INIS)

    Kawai, Masayoshi; Kikuchi, Kenji; Kurishita, Hiroaki; Li, J.-F.; Furusaka, Michihiro

    2001-01-01

    Since the cold neutron source intensity of KENS (the spallation neutron source at High Energy Accelerator Research Organization) was decreased into about a third of the designed value because a cadmium liner at the cold neutron source deformed and obstructed the neutron beam line, the target-moderator-and-reflector assembly (TMRA) has been replaced by a new one aimed at improving the neutron performance and recovering the cold neutron source. The tantalum target has also been replaced by a tantalum-clad tungsten one. In order to bond the tantalum-clad with the tungsten block, a hot isostatic press (HIP) process was applied and optimized. It was found that gaseous interstitial impurity elements severely attacked tantalum and embrittled, and that the getter materials such as zirconium and tantalum were effective to reduce the embrittlement

  12. Ion beam analysis of gas turbine blades: evaluation of refurbishment ...

    Indian Academy of Sciences (India)

    Scanning proton microscopy was employed to evaluate the quality of refurbishment process of gas turbine ... environment of hot combustion gases occur due to various processes, such as .... performance of refurbished blades.7. Due to the ...

  13. Refurbishing the BR2 materials testing reactor

    International Nuclear Information System (INIS)

    Baugnet, J.M.; Dekeyser, J.; Gubel, P.

    1995-01-01

    SCK/CEN is refurbishing its BR2 reactor to allow its further operation during the next 15 years; in doing so, it chooses to keep BR2 available for future scientific and technological irradiation programs within an international context. (author) 2 figs

  14. Evaluation methodology for generator refurbishment decisions

    International Nuclear Information System (INIS)

    Moore, W.G.; Ulm, S.F.

    1991-01-01

    The Electrical Power Industry is undergoing tremendous change due to deregulation, aging equipment, environmental concerns, and investment/risk considerations. Public utility commissions, along with shareholders and end consumers, are closely monitoring utilities; decisions, especially in the area of costs-both Operation and Maintenance, and Capital. Increasing emphasis, within the conventional utility environment, has been and continue to be, placed on controlling expenditures. To be responsive to these industry and competitive pressures, utilities must make equipment refurbishment decisions. These decisions should be based on input from many sources, including the severity of the failure, cost of replacement versus refurbishment, risks and safety considerations, the expected remaining life of the unit, operational mode (base or peak), fuel type, initial costs, system capacity, available budgets, and financing options. Many times, however, refurbishment decisions are base don an abstract understanding of the above, but feel, or emotional attachment to a particular option. This paper describes a general methodology for refurbishment decision making, applied specifically to generators. Also included in a case history of one utility's progression through this process

  15. E-waste Management and Refurbishment Prediction (EMARP) Model for Refurbishment Industries.

    Science.gov (United States)

    Resmi, N G; Fasila, K A

    2017-10-01

    This paper proposes a novel algorithm for establishing a standard methodology to manage and refurbish e-waste called E-waste Management And Refurbishment Prediction (EMARP), which can be adapted by refurbishing industries in order to improve their performance. Waste management, particularly, e-waste management is a serious issue nowadays. Computerization has been into waste management in different ways. Much of the computerization has happened in planning the waste collection, recycling and disposal process and also managing documents and reports related to waste management. This paper proposes a computerized model to make predictions for e-waste refurbishment. All possibilities for reusing the common components among the collected e-waste samples are predicted, thus minimizing the wastage. Simulation of the model has been done to analyse the accuracy in the predictions made by the system. The model can be scaled to accommodate the real-world scenario. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. Fabrication and Evaluation of Tinidazole Microbeads for Colon Targeting

    Directory of Open Access Journals (Sweden)

    Amit K. Pandey

    2012-05-01

    Full Text Available Objective: The purpose of present investigation was to develop and evaluate multiparticulate system exploiting pH-sensitive property and specific biodegradability of calcium alginate microbeads, for colon- targeted delivery of Tinidazole for the treatment of amoebic colitis. Methods: Calcium alginate beads containing Tinidazole were prepared by ionotropic gelation technique followed by coating with Eudragit S100 using solvent evaporation method to obtain pH sensitive microbeads. Various formulation parameters were optimized which included concentration of sodium alginate (2% w/v, curing time (20 min and concentration of pectin (1% w/ v. All the formulations were evaluated for surface morphology, particle size analysis, entrapment efficiency and in-vitro drug release in conditions simulating colonic fluid in the presence of rat caecal (2% w/v content. Results: The average size of beads of optimized formulation (FT4 was found to be 998.73依5.12 毺 m with entrapment efficiency of 87.28依2.19 %. The invitro release of Eudragit S100 coated beads in presence of rat caecal content was found to be 70.73%依1.91% in 24 hours. Data of in-vitro release was fitted into Higuchi kinetics and Korsmeyer Peppas equation to explain release profile. The optimized formulation (FT4 showed zero order release. Conclusions: It is concluded that calcium alginate microbeads are the potential system for colon delivery of Tinidazole for chemotherapy of amoebic infection.

  17. Fabrication technology for a series of cylindrical thin-wall cavity targets

    CERN Document Server

    Zheng Yong; Sun Zu Oke; Wang Ming Da; Zhou La; Zhou Zhi Yun

    2002-01-01

    Cylindrical thin-wall cavity targets have been fabricated to study the behavior of superthermal electrons and their effects on inertial confinement fusion (ICF). Self-supporting cavity targets having adjustable, uniform wall thickness, and low surface roughness were required. This required production of high-quality mandrels, coating them by sputtering or electroplating, developing techniques for measurement of wall thickness and other cavity parameters, improving the uniformity of rotation of the mandrels, and preventing damage to the targets during removal from the mandrels. Details of the fabrication process are presented. Experimental results from the use of these targets are presented. These results, in good agreement with simulations, indicate that the use of thin-wall cavity targets is an effective method for studying superthermal electrons in ICF.

  18. Complete fabrication of target experimental chamber and implement initial target diagnostics to be used for the first target experiments in NDCX-1

    International Nuclear Information System (INIS)

    Bieniosek, F.M.; Bieniosek, F.M.; Dickinson, M.R.; Henestroza, E.; Katayanagi, T.; Jung, J.Y.; Lee, C.W.; Leitner, M.; Ni, P.; Roy, P.; Seidl, P.; Waldron, W.; Welch, D.

    2008-01-01

    The Heavy Ion Fusion Science Virtual National Laboratory (HIFS-VNL) has completed the fabrication of a new experimental target chamber facility for future Warm Dense Matter (WDM) experiments, and implemented initial target diagnostics to be used for the first target experiments in NDCX-1. The target chamber has been installed on the NDCX-I beamline. This achievement provides to the HIFS-VNL unique and state-of-the-art experimental capabilities in preparation for the planned target heating experiments using intense heavy ion beams

  19. Investigation on fabrication and positioning of cryogenic shell laser fusion targets. Annual report, October 1, 1977--November 30, 1978

    International Nuclear Information System (INIS)

    Kim, K.

    1978-01-01

    The research has been directed toward fabrication and positioning of cryogenic shell laser fusion targets, with particular emphasis on the development of a scheme which would allow for continuous fabrication, inspection, and delivery of the targets. Specifically, progress has been made in each of the following areas: (1) fabrication of a uniform layer of solid DT inside a glass microshell using a combination of helium gas jets and a heater wire; (2) levitation-freezing of a DT-filled glass microshell as a method for fabricating and positioning a cryogenic shell target; (3) a target fabrication system intended for continuous fabrication, inspection, and delivery of cryogenic targets; and (4) development of diagnostics for inspection, recording, and analysis of a solid DT layer inside a glass microshell, and for observing the parameters controlling the target freezing process

  20. Water electrolysis system refurbishment and testing

    Science.gov (United States)

    Greenough, B. M.

    1972-01-01

    The electrolytic oxygen generator for the back-up water electrolysis system in a 90-day manned test was refurbished, improved and subjected to a 182-day bench test. The performance of the system during the test demonstrated the soundness of the basic electrolysis concept, the high development status of the automatic controls which allowed completely hands-off operation, and the capability for orbital operation. Some design improvements are indicated.

  1. Current status of JMTR refurbishment project

    International Nuclear Information System (INIS)

    Kaminaga, Masanori; Niimi, Motoji; Hori, Naohiko; Takahashi, Kunihiro; Kanno, Masaru; Nakagawa, Tetsuya; Nagao, Yoshiharu; Ishihara, Masahiro; Kawamura, Hiroshi

    2010-02-01

    The JMTR is a light water moderated and cooled, beryllium reflected tank- type reactor using LUE silicide plate-type fuels. Its thermal power is 50 MW, maximum thermal and fast neutron flux is 4x10 18 m -2 s -1 . First criticality was achieved in March 1968, and its operation was stopped from August, 2006 for the refurbishment. The refurbishment is scheduled from the beginning of FY2007 to the end of FY2010. The renewed and upgraded JMTR will be re-started from FY2011. An investigation on aged components (aged-investigation) was carried out for concrete structures of the JMTR reactor building, exhaust stack, etc., and for tanks in the primary cooling system, heat exchangers, pipes in the secondary cooling system, cooling tower, emergency generators and so on, in order to identify their integrity. The aged-investigation was carried out at the beginning of FY2007. As a result, some components were decided to replace from viewpoints of future maintenance and improvement of reliability, and some components or structures were decided to repair. A visual inspection of inner side of the pressure vessel was carried out using an underwater camera in FY2008, and no serious damage was observed. Up to now, refurbishment works are in progress according to the planned schedule. In FY2009, motors of primary cooling pumps, secondary cooling pumps, motors of drain pumps, pump in the primary water transfer line to the water purification system, beryllium reflector frame, low-voltage motor control centers are to be replaced. A nuclear instrumentation system, process control system, safety protection system and so on are to be replaced in FY2010. In this paper, current status of JMTR refurbishment project is presented. (author)

  2. Process for the fabrication of aluminum metallized pyrolytic graphite sputtering targets

    Science.gov (United States)

    Makowiecki, Daniel M.; Ramsey, Philip B.; Juntz, Robert S.

    1995-01-01

    An improved method for fabricating pyrolytic graphite sputtering targets with superior heat transfer ability, longer life, and maximum energy transmission. Anisotropic pyrolytic graphite is contoured and/or segmented to match the erosion profile of the sputter target and then oriented such that the graphite's high thermal conductivity planes are in maximum contact with a thermally conductive metal backing. The graphite contact surface is metallized, using high rate physical vapor deposition (HRPVD), with an aluminum coating and the thermally conductive metal backing is joined to the metallized graphite target by one of four low-temperature bonding methods; liquid-metal casting, powder metallurgy compaction, eutectic brazing, and laser welding.

  3. Design and fabrication of foam-insulated cryogenic target for wet-wall laser fusion reactor

    International Nuclear Information System (INIS)

    Norimatsu, T.; Takeda, T.; Nagai, K.; Mima, K.; Yamanaka, T.

    2003-01-01

    A foam insulated cryogenic target was proposed for use in a future laser fusion reactor with a wet wall. This scheme can protect the solid DT layer from melting due to surface heating by adsorption of metal vapor without significant reduction in the target gain. Design spaces for the injection velocity and the acceptable vapor pressure in the reactor are discussed. Basic technology to fabricate such structure was demonstrated by emulsion process. Concept of a cryogenic fast-ignition target with a gold guiding cone was proposed together with direct injection filling of liquid DT. (author)

  4. Refurbishment of the reactor protection system at Paks NPP. The refurbishment process

    International Nuclear Information System (INIS)

    Turi, T.; Katics, B.

    1998-01-01

    The Reactor Protection System Refurbishment Project had an extensive preparation period in Paks started in 1992. During this preparation a large volume of the basic engineering tasks has been performed and as a result a contract for implementation of a three-train digital RPS on the four Units was concluded with Siemens in September, 1996. According to that contract the first refurbished Unit will be commissioned in 1999 followed by a further Unit in each succeeding year. This paper introduces the process of the refurbishment, overview of the V and V activities, introduce the architecture, summarize the main design principles and outlines the additional tasks to be performed together with the RPS design. (author)

  5. Fabrication of 94Zr thin target for recoil distance doppler shift method of lifetime measurement

    International Nuclear Information System (INIS)

    Gupta, C.K.; Rohilla, Aman; Abhilash, S.R.; Kabiraj, D.; Singh, R.P.; Mehta, D.; Chamoli, S.K.

    2014-01-01

    A thin isotopic 94 Zr target of thickness 520μg/cm 2 has been prepared for recoil distance Doppler shift method (RDM) lifetime measurement by using an electron beam deposition method on tantalum backing of 3.5 mg/cm 2 thickness at Inter University Accelerator Center (IUAC), New Delhi. To meet the special requirement of smoothness of surface for RDM lifetime measurement and also to protect the outer layer of 94 Zr from peeling off, a very thin layer of gold has been evaporated on a 94 Zr target on a specially designed substrate holder. In all, 143 mg of 99.6% enriched 94 Zr target material was utilized for the fabrication of 94 Zr targets. The target has been successfully used in a recent RDM lifetime measurement experiment at IUAC

  6. Fabrication of 94Zr thin target for recoil distance doppler shift method of lifetime measurement

    Science.gov (United States)

    Gupta, C. K.; Rohilla, Aman; Abhilash, S. R.; Kabiraj, D.; Singh, R. P.; Mehta, D.; Chamoli, S. K.

    2014-11-01

    A thin isotopic 94Zr target of thickness 520 μg /cm2 has been prepared for recoil distance Doppler shift method (RDM) lifetime measurement by using an electron beam deposition method on tantalum backing of 3.5 mg/cm2 thickness at Inter University Accelerator Center (IUAC), New Delhi. To meet the special requirement of smoothness of surface for RDM lifetime measurement and also to protect the outer layer of 94Zr from peeling off, a very thin layer of gold has been evaporated on a 94Zr target on a specially designed substrate holder. In all, 143 mg of 99.6% enriched 94Zr target material was utilized for the fabrication of 94Zr targets. The target has been successfully used in a recent RDM lifetime measurement experiment at IUAC.

  7. Fabrication of {sup 94}Zr thin target for recoil distance doppler shift method of lifetime measurement

    Energy Technology Data Exchange (ETDEWEB)

    Gupta, C.K.; Rohilla, Aman [Department of Physics and Astrophysics, University of Delhi, Delhi 110007 (India); Abhilash, S.R.; Kabiraj, D.; Singh, R.P. [Inter University Accelerator Centre, Aruna Asaf Ali Marg, New Delhi 110067 (India); Mehta, D. [Department of Physics, Panjab University, Chandigarh 160014 (India); Chamoli, S.K., E-mail: skchamoli@physics.du.ac.in [Department of Physics and Astrophysics, University of Delhi, Delhi 110007 (India)

    2014-11-11

    A thin isotopic {sup 94}Zr target of thickness 520μg/cm{sup 2} has been prepared for recoil distance Doppler shift method (RDM) lifetime measurement by using an electron beam deposition method on tantalum backing of 3.5 mg/cm{sup 2} thickness at Inter University Accelerator Center (IUAC), New Delhi. To meet the special requirement of smoothness of surface for RDM lifetime measurement and also to protect the outer layer of {sup 94}Zr from peeling off, a very thin layer of gold has been evaporated on a {sup 94}Zr target on a specially designed substrate holder. In all, 143 mg of 99.6% enriched {sup 94}Zr target material was utilized for the fabrication of {sup 94}Zr targets. The target has been successfully used in a recent RDM lifetime measurement experiment at IUAC.

  8. Fabrication and testing of gas filled targets for large scale plasma experiments on Nova

    International Nuclear Information System (INIS)

    Stone, G.F.; Spragge, M.; Wallace, R.J.; Rivers, C.J.

    1995-01-01

    An experimental campaign on the Nova laser was started in July 1993 to study one st of target conditions for the point design of the National Ignition Facility (NIF). The targets were specified to investigate the current NIF target conditions--a plasma of ∼3 keV electron temperature and an electron density of ∼1.0 E + 21 cm -3 . A gas cell target design was chosen to confine as gas of ∼0.01 cm 3 in volume at ∼ 1 atmosphere. This paper will describe the major steps and processes necessary in the fabrication, testing and delivery of these targets for shots on the Nova Laser at LLNL

  9. Evaluation of three refurbished Guralp CMG-3TB seismometers.

    Energy Technology Data Exchange (ETDEWEB)

    Hart, Darren M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Merchant, Bion J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-05-01

    The overall objective of testing the Guralp CMG-3TB refurbished seismometers is to determine whether or not the refurbished sensors exhibit better data quality and require less maintenance when deployed than the original Guralp CMG-3TBs. SNL will test these 3 refurbished Guralps to verify performance specifications. The specifications that will be evaluated are sensitivity, bandwidth, self-noise, output impedance, clip-level, dynamic range over application passband, verify mathematical response and calibration response parameters for amplitude and phase.

  10. Refurbishment of BR2 (Phases 4 and 5)

    International Nuclear Information System (INIS)

    Gubel, P.; Dekeyser, J.; Van Der Auwera, J.

    1998-01-01

    The BR2 is a materials testing reactor and is SCK-CEN's most important nuclear facility. After an extensive refurbishment to compensate for the ageing of the installation, the reactor was restarted in April 1997. In phase 4 of the refurbishment programme, various activities were performed to allow reactor start-up. In phase 5, remaining refurbishment works were carried out as well as the extra studies and upgradings required by the licensing authorities. Major achievements in 1997 are described and discussed

  11. Refurbishment of BR2 (Phases 4 and 5)

    Energy Technology Data Exchange (ETDEWEB)

    Gubel, P; Dekeyser, J; Van Der Auwera, J

    1998-07-01

    The BR2 is a materials testing reactor and is SCK-CEN's most important nuclear facility. After an extensive refurbishment to compensate for the ageing of the installation, the reactor was restarted in April 1997. In phase 4 of the refurbishment programme, various activities were performed to allow reactor start-up. In phase 5, remaining refurbishment works were carried out as well as the extra studies and upgradings required by the licensing authorities. Major achievements in 1997 are described and discussed.

  12. Fabrication and testing of W7-X pre-series target elements

    International Nuclear Information System (INIS)

    Boscary, J; Boeswirth, B; Greuner, H; Grigull, P; Missirlian, M; Plankensteiner, A; Schedler, B; Friedrich, T; Schlosser, J; Streibl, B; Traxler, H

    2007-01-01

    The assembly of the highly-loaded target plates of the WENDELSTEIN 7-X (W7-X) divertor requires the fabrication of 890 target elements (TEs). The plasma facing material is made of CFC NB31 flat tiles bonded to a CuCrZr copper alloy water-cooled heat sink. The elements are designed to remove a stationary heat flux and power up to 10 MW m -2 and 100 kW, respectively. Before launching the serial fabrication, pre-series activities aimed at qualifying the design, the manufacturing route and the non-destructive examinations (NDEs). High heat flux (HHF) tests performed on full-scale pre-series TEs resulted in an improvement of the design of the bond between tiles and heat sink to reduce the stresses during operation. The consequence is the fabrication of additional pre-series TEs to be tested in the HHF facility GLADIS. NDEs of this bond based on thermography methods are developed to define the acceptance criteria suitable for serial fabrication

  13. Basic policy of JMTR refurbishment and regulatory procedure

    International Nuclear Information System (INIS)

    Tobita, Kenji

    2012-04-01

    The JMTR refurbishment started from FY2007 had been completed on the end of the FY2010. The refurbishment works carried out on about 60 items nuclear reactor systems, (about 40 of facilities and about 20 constructions) with no trouble. This report review the basic policy of JMTR refurbishment, such as a selection of facilities/equipments for the refurbishment and the determination method of specifications for repairs. The deliberation and discussion by the safety review committee of Oarai Research and Development Center in the Japan Atomic Energy Agency and nuclear regulatory procedure are included in this report. (author)

  14. Refurbishing Fæstningens Materialgård

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn

    2014-01-01

    upgrading and refurbishment of the individual buildings that make up the listed complex. The process focuses on the cooperation and dialogue between the parties involved. Fæstningens Materialgård is a case study where the Heritage Agency, the Danish Working Environment Authority and the owner as a team...... cooperated in identifying feasible refurbishment measures. Through the process the owner was supported by architects and engineers. Focus is put on how, to identify potential energy savings and, to decide on energy upgrading measures when refurbishing and restoring listed buildings. The refurbished...

  15. Refurbishment programme for the BR2-reactor

    Energy Technology Data Exchange (ETDEWEB)

    Koonen, E [Centre d' Etude de l' Energie Nucleaire, Studiecentrum voor Kernenergie, BR2 Department, Boeretang, Mol (Belgium)

    1992-07-01

    BR2 is a high flux engineering test reactor, which differs from comparable material testing reactors by its specific core array (fig. 1). It is a heterogeneous, thermal, tank-in-pool type reactor, moderated by beryllium and light water, which serves also as coolant. The fuel elements consist of cylindrical assemblies loaded in channels materialized by hexagonal beryllium prisms. The central 200 mm channel is vertical, while all others are inclined and form a hyperbolical arrangement around the central one. This feature combines a very compact core with the requirement of sufficient space for individual access to all channels through penetrations in the top cover of the aluminium pressure vessel. Each channel may hold a fuel element, a control rod, an experiment, an irradiation device or a beryllium plug. The refurbishment Program According to the present programme of C.E.N./S.C.K., BR2 will be in operation until 1996. At that time, the beryllium matrix will reach its foreseen end-of-life. In order to continue operation beyond this point, a thorough refurbishment of the reactor is foreseen, in addition to the unavoidable replacement of the matrix, to ensure quality of the installation and compliance with modern standards. Some fundamental options have been taken as a starting point: BR2 will continue to be used as a classical MTR, i.e. fuel and material irradiations and safety experiments with some additional service-activities. The present configuration is optimized for that use and there is no specific experimental requirement to change the basic concepts and performance characteristics. From the customers viewpoint, it is desirable to go ahead with the well-known features of BR2, to maintain a high degree of availability and reliability and to minimize the duration of the long shutdown. It is also important to limit the amount of nuclear liabilities. So the objective of the refurbishment programme is the life extension of BR2 for about 15 years, corresponding to

  16. Refurbishment programme for the BR2-reactor

    International Nuclear Information System (INIS)

    Koonen, E.

    1992-01-01

    BR2 is a high flux engineering test reactor, which differs from comparable material testing reactors by its specific core array (fig. 1). It is a heterogeneous, thermal, tank-in-pool type reactor, moderated by beryllium and light water, which serves also as coolant. The fuel elements consist of cylindrical assemblies loaded in channels materialized by hexagonal beryllium prisms. The central 200 mm channel is vertical, while all others are inclined and form a hyperbolical arrangement around the central one. This feature combines a very compact core with the requirement of sufficient space for individual access to all channels through penetrations in the top cover of the aluminium pressure vessel. Each channel may hold a fuel element, a control rod, an experiment, an irradiation device or a beryllium plug. The refurbishment Program According to the present programme of C.E.N./S.C.K., BR2 will be in operation until 1996. At that time, the beryllium matrix will reach its foreseen end-of-life. In order to continue operation beyond this point, a thorough refurbishment of the reactor is foreseen, in addition to the unavoidable replacement of the matrix, to ensure quality of the installation and compliance with modern standards. Some fundamental options have been taken as a starting point: BR2 will continue to be used as a classical MTR, i.e. fuel and material irradiations and safety experiments with some additional service-activities. The present configuration is optimized for that use and there is no specific experimental requirement to change the basic concepts and performance characteristics. From the customers viewpoint, it is desirable to go ahead with the well-known features of BR2, to maintain a high degree of availability and reliability and to minimize the duration of the long shutdown. It is also important to limit the amount of nuclear liabilities. So the objective of the refurbishment programme is the life extension of BR2 for about 15 years, corresponding to

  17. Information-management data base for fusion-target fabrication processes

    International Nuclear Information System (INIS)

    Reynolds, J.

    1982-01-01

    A computer-based data-management system has been developed to handle data associated with target-fabrication processes including glass microballoon characterization, gas filling, materials coating, and storage locations. The system provides automatic data storage and computation, flexible data-entry procedures, fast access, automated report generation, and secure data transfer. It resides on a CDC CYBER 175 computer and is compatible with the CDC data-base-language Query Update, but is based on custom FORTRAN software interacting directly with the CYBER's file-management system. The described data base maintains detailed, accurate, and readily available records of fusion targets information

  18. Refurbishment of a Victorian terraced house for energy efficiency

    Science.gov (United States)

    Dimitriou, Angeliki

    The impacts of global warming are now obvious. The international community has committed itself to reduce CO2 emissions, the main contributor to the greenhouse effect, both at international and national levels. In the Kyoto Protocol signed in 1997, countries have committed to reduce their greenhouse gases emissions below their 1990 levels by the period 2008-2012. The UK specifically should reduce those emissions by 12.5%. Format reason, the UK has introduced a package of policies, which promote not only the use of renewable energy resources, but most importantly the reduction in energy use, with energy efficiency. Refurbishment of existing houses has and will contribute to the reduction of energy consumption. A Victorian mid-terraced house was studied in this report, and different refurbishment measures were tested, using two software programmes: TAS and SAP. The targets were to achieve certain levels of thermal comfort, to comply with the Building Regulation for building thermal elements and to achieve a high SAP rating. Then, the cost of each measure was calculated and its CO2 emissions were compared. Heat losses were mainly through the walls and roof. Roof and mainly wall refurbishment measures reduce the heating loads the most. Ground floor insulation does not contribute to the reduction of the heating loads, on the contrary it has detrimental effect in summer, where the cooling effect coming from the ground is being reduced. Window replacement achieves a very good performance in summer resulting in the reduction of overheating. Wall and roof insulation increase the SAP rating the most, between the building elements, but boiler replacement and upgrading of heating controls increase it more. According to the SAP rating, CO2 annual emissions are reduced the most by boiler replacement and then by wall and roof. The results given by the two softwares concerning which measure is more leads more to energy efficiency, are the same. Finally, if the measures which lead

  19. Advanced instrumentation and control systems for CANDU refurbishment

    International Nuclear Information System (INIS)

    Sklyar, V.; Bakhmach, I.; Kharchenko, V.; Andrashov, A.; Baranova, O.

    2011-01-01

    The purpose of the work is to discuss opportunities to modernize I and C systems of CANDU reactors on the base of Radiy's digital safety platform. This paper discusses the following topics: a business model for CANDU, I and C systems refurbishment, FPGA technology issues, comparison of different approaches to refurbish obsolete I and C systems. (author)

  20. Target fabrication and development in the Centre d'Etudes de Limeil

    International Nuclear Information System (INIS)

    Clement, X.; Coudeville, A.; Eyharts, P.; Perrine, J.P.; Rouillard, R.

    1983-10-01

    The present state of research in Limeil laboratory for the production of inertial confinement fusion targets is described in this communication. A summary of typical areas, previously investigated, including new developments, is as follows: - production of hollow glass microspheres, having wide outside diameter range and aspect-ratio, using dried-alcogels, - preparation and fabrication of low density foams having plane or hemispherical shape, - deposition of a wide range of conductive materials as well as silicon and organic polymers, - development of laser and spark erosion machining which are useful tools for producing minute parts of complex targets, - characterization and analysis of plastic or coal metal coated targets, are done by using interferometry techniques and X-ray image analysis as well as X-ray absorption measurements

  1. I and C systems refurbishment projects for plant life extension

    International Nuclear Information System (INIS)

    Andrashov, A.A.; Sklyar, V.V.; Siora, A.A.

    2012-01-01

    This paper describes the approach to implementation of Nuclear Power Plants (NPPs) Instrumentation and Control (I and C) systems refurbishment projects using Field Programmable Gate Array (FPGA)-based platform. The analysis identifying advantages of refurbishment projects for NPPs is performed. The main goals of the utilities with respect to refurbishment of NPPs I and C systems are outlined. The advantages of FPGA technology application for NPP I and C systems are described. Regulatory framework of FPGA technology for NPPs I and C systems is presented. General principles which may be used for implementation of NPPs I and C system refurbishment projects are presented. The experience of Research and Production Corporation (RPC) Radiy in implementation of NPPs I and C system refurbishment projects is considered. (author)

  2. Integration of remote refurbishment performed on ITER components

    Energy Technology Data Exchange (ETDEWEB)

    Dammann, A., E-mail: alexis.dammann@iter.org [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Antola, L. [AMEC, 31 Parc du Golf, CS 90519, 13596 Aix en Provence (France); Beaudoin, V. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Dremel, C. [Westinghouse, Electrique France/Astare, 122 Avenue de Hambourg, 13008 Marseille (France); Evrard, D. [SOGETI High Tech, 180 Rue René Descartes, 13851 Aix en Provence (France); Friconneau, J.P. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Lemée, A. [SOGETI High Tech, 180 Rue René Descartes, 13851 Aix en Provence (France); Levesy, B.; Pitcher, C.S. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2015-10-15

    Highlights: • System engineering approach to consolidate requirements to modify the layout of the Hot Cell. • Illustration of the loop between requirement and design. • Verification process. - Abstract: Internal components of the ITER Tokamak are replaced and transferred to the Hot Cell by remote handling equipment. These components include port plugs, cryopumps, divertor cassettes, blanket modules, etc. They are brought to the refurbishment area of the ITER Hot Cell Building for cleaning and maintenance, using remote handling techniques. The ITER refurbishment area will be unique in the world, when considering combination of size, quantity of complex component to refurbish in presence of radiation, activated dust and tritium. The refurbishment process to integrate covers a number of workstations to perform specific remote operations fully covered by a mast on crane system. This paper describes the integration of the Refurbishment Area, explaining the functions, the methodology followed, some illustrations of trade-off and safety improvements.

  3. Investigation on cryogenic laser fusion targets: fabrication, characterization, and transport. Annual report, December 1, 1978-November 30, 1979

    International Nuclear Information System (INIS)

    Kim, K.

    1979-01-01

    The research has been directed toward fabrication, characterization, and positioning of cryogenic shell laser fusion targets, with particular emphasis on the development of a scheme which would allow for continuous fabrication, inspection, and delivery of the targets. Specifically, progress has been made in the following areas: (1) Fabrication of a uniform spherical shell of DT-condensate using a cold-wall target-freezing-cell. (2) Fabrication of a uniform spherical shell of liquid DT using a room-temperature wall target-freezing-cell. (3) Support-free cryogenic target fabrication using cold-gas-levitation. (4) Continuous fabrication of cryogenic targets using free-fall method. (5) Automatic characterization of DT-layer uniformity. (6) Sorting of DT-filled glass microshells using an interference microscope. (7) Development of an a-c interference microscope for accurate characterization of moving targets. (8) Development of a machine which is capable of producing a continuous stream of uniform DT spheres of controllable sizes. (9) Theoretical study on the behavior of liquid hydrogen contained in a spherical shell

  4. Recent Developments in Fabrication of Direct Drive Cylinder Targets for Hydrodynamics Experiments at the OMEGA Laser

    International Nuclear Information System (INIS)

    Nobile, A.; Balkey, M.M.; Bartos, J.J.; Batha, S.H.; Day, R.D.; Elliott, J.E.; Elliott, N.E.; Gomez, V.M.; Hatch, D.J.; Lanier, N.E.; Fincke, J.R.; Manzanares, R.; Pierce, T.H.; Sandoval, D.L.; Schmidt, D.W.; Steckle, W.P.

    2004-01-01

    Experimental campaigns are being conducted at the 60 beam OMEGA laser at the University of Rochester's Laboratory for Laser Energetics to acquire data to validate hydrodynamic models in the high energy-density regime. This paper describes targets that have been developed and constructed for these experimental campaigns. Targets are 860 μm inner diameter by 2.2 mm length cylinders with 70 μm thick polymer ablator. On the ablator inner surface and located halfway along the axis of the cylinder is a 500 μm wide Al marker band. Band thicknesses in the range 8-16 microns are used. CH foam with densities in the range 30-90 mg/cc fills the inside of the cylinder. While these targets have been fabricated for years, several new improvements and features have recently been developed. Improvements include the use of epoxy instead of polystyrene for the ablator, and the use of electrodeposited Al for the marker band. A critical feature of the target is the surface feature that is placed on the marker band. Experiments are aimed at understanding the hydrodynamic behavior of imploding cylinders as a function of this surface feature. Recent development work has focused on production of engineered surface features on the target marker band. Using a fast tool servo on a diamond turning lathe, a wide range of specified surface features have been produced. This paper will address improvements to the cylinder targets as well as current development efforts

  5. Sustainable refurbishment of exterior walls and building facades. Final report, Part B - General refurbishment concepts

    Energy Technology Data Exchange (ETDEWEB)

    Vares, S.; Pulakka, S.; Toratti, T. [and others

    2012-11-01

    This report is the second part of the final report of Sustainable refurbishment of building facades and exterior walls (SUSREF). SUSREF project was a collaborative (small/medium size) research project within the 7th Framework Programme of the Commission and it was financed under the theme Environment (including climate change) (Grant agreement no. 226858). The project started in October 1st 2009 and ended in April 30th 2012. The project included 11 partners from five countries. SUSREF developed sustainable concepts and technologies for the refurbishment of building facades and external walls. This report together with SUSREF Final report Part B and SUSREF Final Report Part C introduce the main results of the project. Part A focuses on methodological issues. The descriptions of the concepts and the assessment results of the developed concepts are presented in SUSREF Final report part B (generic concepts) and SUSREF Final report Part C (SME concepts). The following list shows the sustainability assessment criteria defined by the SUSREF project. These are Durability; Impact on energy demand for heating; Impact on energy demand for cooling; Impact on renewable energy use potential; Impact on daylight; Environmental impact of manufacture and maintenance; Indoor air quality and acoustics; Structural stability; Fire safety; Aesthetic quality; Effect on cultural heritage; Life cycle costs; Need for care and maintenance; Disturbance to the tenants and to the site; Buildability. This report presents sustainability assessment results of general refurbishment concepts and gives recommendations on the basis of the results. The report covers the following refurbishment cases - External insulation - Internal insulation - Cavity wall insulation - Replacement Insulation during renovation.

  6. Pre-series and testing route for the serial fabrication of W7-X target elements

    International Nuclear Information System (INIS)

    Boscary, J.; Greuner, H.; Friedrich, T.; Traxler, H.; Mendelevitch, B.; Boeswirth, B.; Schlosser, J.; Smirnow, M.; Stadler, R.

    2009-01-01

    The fabrication of the actively cooled high-heat flux divertor of the WENDELSTEIN 7-X stellarator (W7-X) requires the delivery of 890 target elements, which are designed to withstand a stationary heat flux of 10 MW/m 2 . The organization of the manufacturing and testing route for the serial fabrication is the result of the pre-series activities. Flat CFC Sepcarb NB31 tiles are bonded to CuCrZr copper alloy cooling structure in consecutive steps. A copper layer is active metal cast to CFC tiles, and then an OF-copper layer is added by hot isostatic pressing to produce bi-layer tiles. These tiles are bonded by electron beam welding onto the cooling structure, which was manufactured independently. The introduction of the bi-layer technology proved to be a significant improvement of the bond reliability under thermal cycling loading. This result is also the consequence of the improved bond inspections throughout the manufacturing route performed in the ARGUS pulsed thermography facility of PLANSEE. The repairing process by electron beam welding of the bonding was also qualified. The extended pre-series activities related to the qualification of fabrication processes with the relevant non-destructive examinations aim to minimize the risks for the serial manufacturing and to guarantee the steady-state operation of the W7-X divertor.

  7. Mechanical Properties Experimental Study of Engineering Vehicle Refurbished Tire

    Science.gov (United States)

    Qiang, Wang; Xiaojie, Qi; Zhao, Yang; Yunlong, Wang; Guotian, Wang; Degang, Lv

    2018-05-01

    The vehicle refurbished tire test system was constructed, got load-deformation, load-stiffness, and load-compression ratio property laws of engineering vehicle refurbished tire under the working condition of static state and ground contact, and built radial direction loading deformation mathematics model of 26.5R25 engineering vehicle refurbished tire. The test results show that radial-direction and side-direction deformation value is a little less than that of the new tire. The radial-direction stiffness and compression ratio of engineering vehicle refurbished tire were greatly influenced by radial-direction load and air inflation pressure. When load was certain, radial-direction stiffness would increase with air inflation pressure increasing. When air inflation pressure was certain, compression ratio of engineering vehicle refurbished tire would enlarge with radial-direction load increasing, which was a little less than that of the new and the same type tire. Aging degree of old car-case would exert a great influence on deformation property of engineering vehicle refurbished tire, thus engineering vehicle refurbished tires are suitable to the working condition of low tire pressure and less load.

  8. Multivariant design and multiple criteria analysis of building refurbishments

    Energy Technology Data Exchange (ETDEWEB)

    Kaklauskas, A.; Zavadskas, E. K.; Raslanas, S. [Faculty of Civil Engineering, Vilnius Gediminas Technical University, Vilnius (Lithuania)

    2005-07-01

    In order to design and realize an efficient building refurbishment, it is necessary to carry out an exhaustive investigation of all solutions that form it. The efficiency level of the considered building's refurbishment depends on a great many of factors, including: cost of refurbishment, annual fuel economy after refurbishment, tentative pay-back time, harmfulness to health of the materials used, aesthetics, maintenance properties, functionality, comfort, sound insulation and longevity, etc. Solutions of an alternative character allow for a more rational and realistic assessment of economic, ecological, legislative, climatic, social and political conditions, traditions and for better the satisfaction of customer requirements. They also enable one to cut down on refurbishment costs. In carrying out the multivariant design and multiple criteria analysis of a building refurbishment much data was processed and evaluated. Feasible alternatives could be as many as 100,000. How to perform a multivariant design and multiple criteria analysis of alternate alternatives based on the enormous amount of information became the problem. Method of multivariant design and multiple criteria of a building refurbishment's analysis were developed by the authors to solve the above problems. In order to demonstrate the developed method, a practical example is presented in this paper. (author)

  9. An Effort to Improve U Foil Fabrication Technology of Roll-casting for Fission Mo Target

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chang Kyu; Woo, Yun Myeong; Kim, Ki Hwan; Oh, Jong Myeong [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Sim, Moon Soo [Chungnam University, Green Energy Technology, Daejeon (Korea, Republic of)

    2010-10-15

    Mo-99 isotope has been produced mainly by extracting fission products of {sup 235}U. The targets for irradiating in reactor have used as stainless tube coated with highly enriched UO{sub 2} at the inside surface and highly enriched UAlx plate cladded with aluminum. In connection with non-proliferation policy the RERTR program developed a new process of Mo-99 using low enriched uranium (LEU) instead of highly enriched uranium (HEU). LEU should be put about five times more quantity than HEU because the {sup 235}U contents of LEU and HEU are 20% and higher than 90%, respectively. Accordingly pure uranium metal foil target was adopted as a promising target material due to high uranium density. ANL and BATAN developed a Cintichem process using uranium metal foil target of 130 {mu}m in thickness jointly and the RERTR program is trying to disseminate the new process world-widely. However, uranium foil is made by lots of times rolling work on uranium plate, which is laborious and tedious. In order to avoid this difficulty KAERI developed a new process of making foil directly from uranium melt by roll casting. This process is very much simple, productive, and cost-effective. But the outside surface of foil is generally very rough. A typical transverse cross section had a minimum thickness of 65 {mu}m and a maximum thickness of 205 {mu}m. This roughness could affect (1) target fabrication, where the U foil, or the Ni foil might be damaged during drawing, and (2) irradiation behavior, where gaps between the target walls and the U metal might affect cooling of the target

  10. Refurbishment of BR2 (Phases 4 and 5)

    Energy Technology Data Exchange (ETDEWEB)

    Gubel, P.; Dekeyser, J.; Van Der Auwera, J

    1998-07-01

    The BR2 is a materials testing reactor and is SCK-CEN's most important nuclear facility. After an extensive refurbishment to compensate for the ageing of the installation, the reactor was restarted in April 1997. In phase 4 of the refurbishment programme, various activities were performed to allow reactor start-up. In phase 5, remaining refurbishment works were carried out as well as the extra studies and upgradings required by the licensing authorities. Major achievements in 1997 are described and discussed.

  11. Refurbishment of Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Thompson, P.D.; Jaitly, R.; Ichiyen, N.; Petrilli, M.A.

    2004-01-01

    NB Power is planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station (PLGS) beginning in April 2008. The major activity would be the replacement of all 380 Fuel Channel and Calandria Tube Assemblies and the connecting feeder pipes. This activity is referred to as Retube. NB Power would also take advantage of this outage to conduct a number of repairs, replacements, inspections and upgrades (such as rewinding or replacing the generator, replacement of shutdown system trip computers, replacement of certain valves and expansion joints, inspection of systems not normally accessible, etc). These collective activities are referred to as Refurbishment. This would allow the station to operate for an additional 25 to 30 years. The scope of the project was determined from the outcome of a two-year study involving a detailed condition assessment of the station that examined issues relating to ageing and obsolescence. The majority of the plant components were found to be capable of supporting extended operation without needing replacement or changes. In addition to the condition assessment, a detailed review of Safety and Licensing issues associated with extended operation was performed. This included a review of known regulatory and safety issues, comparison of the station against current codes and standards, and comparison of the station against safety related modifications made to more recent CANDU 6 units. Benefit cost analyses (BCA) were performed to assist the utility in determining which changes were appropriate to include in the project scope. As a Probabilistic Safety Assessment (PSA) for PLGS did not exist at the time, a risk baseline for the station had to be determined for use in the BCA. Extensive dialogue with the Canadian Nuclear Safety Commission staff was also undertaken during this phase. A comprehensive Licensing Framework was produced upon which the CNSC provided feedback to NB Power. This feedback was important in terms of

  12. Fabrication of a nanocarrier system through self-assembly of plasma protein and its tumor targeting

    International Nuclear Information System (INIS)

    Gong Guangming; Zhi Feng; Wang Kaikai; Tang Xiaolei; Yuan Ahu; Zhao Lili; Ding Dawei; Hu Yiqiao

    2011-01-01

    Human serum albumin (HSA) nanoparticles hold great promise as a nanocarrier system for targeted drug delivery. The objective of this study was to explore the possibility of preparing size controllable albumin nanoparticles using the disulfide bond breaking reagent β-mercaptoethanol (β-ME). The results showed that the protein concentration and temperature had positive effects on the sizes of the albumin nanoparticles, while pH had a negative effect on the rate of nanoparticle formation. The addition of β-ME induced changes in HSA secondary structure and exposed the hydrophobic core of HSA, leading to the formation of nanoparticles. Human serum albumin nanoparticles could be internalized by MCF-7 cells and mainly accumulated in cytoplasm. After injection in tumor bearing mice, the HSA nanoparticles accumulated in tumor tissues, demonstrating the targeting ability of the nanoparticles. Therefore, human serum albumin can be fabricated into nanoparticles by breaking the disulfide bonds and these nanoparticles exhibit high tumor targeting ability. Human serum albumin nanoparticles could be ideal for the targeted delivery of pharmacologically active substances.

  13. An integrated design process for a zero-energy refurbishment prototype for post-war residential buildings in the Netherlands

    NARCIS (Netherlands)

    Konstantinou, T.; Klein, T.; Guerra Santin, O.; Boess, S.U.; Silvester, S.

    2015-01-01

    Although refurbishment is a necessary step to reach the ambitious energy and decarbonisation targets for 2020 and 2050, which require an eventual reduction up to 90% in CO2 emissions, the rate of renovation is still relatively low. There is an increasing demand to upgrade both the physical condition

  14. Refurbishment of Cirus in-core components

    International Nuclear Information System (INIS)

    Bhatnagar, A.; Sahu, A.K.; Rathore, K.K.; Subudhi, D.; Kharpate, A.V.; Tikku, A.C.

    2006-01-01

    Circus is a 40- MWt vertical tank type research reactor with natural uranium as fuel, demineralised light water as coolant, heavy water as moderator and graphite as reflector. The reactor was commissioned in the year 1960 and operated at an overage availability factor of over 70% till early nineties, when various systems, structures and components (SSCs) started showing signs of ageing. Detailed ageing studies were therefore carried out to assess the condition of various SSCs and refurbishing requirements were finalized towards extending the life of the reactor. In-core components, being non-replaceable generally, were critically examined to the extent possible. Detailed visual examination of a few reactor vessel (RV) tubes, made of aluminium, was carried out using micro video camera and in addition all the RV tubes were inspected using eddy current testing method. RV shell, also made of aluminium, was similarly visually inspected with micro video camera. To assess the effect of irradiation on the RV material, samples of similar tubes irradiated to comparable neutron fluence were tested. Towards assessment of fatigue life of RV expansion joint, made of aluminium, a finite element analysis using NISA computer code was performed. Theoretical assessment for stored Wigner energy in graphite reflector was carried out. Graphite block samples were also removed from the reactor and stored energy levels were measured to plan for any in-situ graphite annealing, if required. Visual inspection of approachable portions of steel and aluminium thermal shields was also carried out. These water-cooled thermal shields provided above and below the RV were hydro tested. The weld joint between coolant inlet pipe and top plate of upper aluminium shield showed minor leakage. A special metallic hollow plug was developed and remotely installed in the leaky pipe to isolate the leaky portion while maintaining the coolant flow in the pipe. Helium leak was found from flange joints located on

  15. Cost Modeling for Fabrication of Direct Drive Inertial Fusion Energy Targets

    International Nuclear Information System (INIS)

    Rickman, William Samuel; Goodin, Daniel T.

    2003-01-01

    Chemical engineering analyses are underway for a commercial-scale [1000-MW(electric)] divinyl benzene foam-based Inertial Fusion Energy (IFE) Target Fabrication Facility (TFF). This facility is designed to supply 500,000, 4-mm-outer diameter targets per day - coated via interfacial polycondensation, dried with supercritical CO 2 , sputter coated with Au and/or Pd, and filled with deuterium-tritium layered at cryogenic temperatures and injected into the fusion chamber. Such targets would be used in a direct-drive IFE power plant.The work uses manufacturing processes being developed in the laboratory, chemical engineering scaleup principles, and established cost-estimating methods. The plant conceptual design includes a process flow diagram, mass and energy balances, equipment sizing and sketches, storage tanks, and facility views.The cost estimate includes both capital and operating costs. Initial results for a TFF dedicated to one 1000-MW(electric) plant indicate that the costs per target are well within the commercially viable range. Larger TFF plants [3000 MW(electric)] are projected to lead to significantly reduced costs per injected target. Additional cost reductions are possible by producing dried, sputter-coated empty shells at a central facility that services multiple power plants.The results indicate that the installed capital cost is about $100 million and the annual operating costs will be about $20 million, for a cost per target of about $0.17 each. These design and cost projections assume that a significant process development and scaleup program is successfully completed for all of the basic unit operations included in the facility

  16. Ultra-hard AlMgB14 coatings fabricated by RF magnetron sputtering from a stoichiometric target

    Science.gov (United States)

    Grishin, A. M.; Khartsev, S. I.; Böhlmark, J.; Ahlgren, M.

    2015-01-01

    For the first time hard aluminum magnesium boride films were fabricated by RF magnetron sputtering from a single stoichiometric ceramic AlMgB14 target. Optimized processing conditions (substrate temperature, target sputtering power and target-to-substrate distance) enable fabrication of stoichiometric in-depth compositionally homogeneous films with the peak values of nanohardness 88 GPa and Young's modulus 517 GPa at the penetration depth of 26 nm and, respectively, 35 and 275 GPa at 200 nm depth in 2 μm thick film.

  17. Ion beam analysis of gas turbine blades: evaluation of refurbishment ...

    Indian Academy of Sciences (India)

    Abstract. Refurbishment of hot components of gas turbines damaged in the harsh working environments is neces- ... 3000 r.p.m. and fluid forces that can cause fracture, yield- ... 800, 1200 and 2000 grit by employing mechanical grinding.

  18. Modernization and refurbishment of the Central Interim Storage

    International Nuclear Information System (INIS)

    Mele, I.; Zeleznik, N.

    2002-01-01

    The Central Interim Storage for radioactive waste in Brinje, being put into operation in 1986, needs refurbishment and modernization in order to meet the up-to-date operational and safety requirements and to ensure the normal and undisturbed acceptance of radioactive waste from small producers in the future. Because of the waste, being already stored in the storage, the lack of reprocessing capacities and the lack of auxiliary room, the refurbishment and modernization is a complex problem, which needs to be addressed with care. The plan of refurbishment and modernization requires an integral approach, covering all different aspects of renewal and reconstruction. The implementation plan, however, must be based on the actual state of the storage and real conditions for the implementations: from technical to financial. In this paper the project for refurbishment and modernization of the storage, and some activities that have already been implemented, are presented.(author)

  19. Refurbishment of Railroad Crossties : A Technical and Economic Analysis

    Science.gov (United States)

    1977-12-01

    An analysis of the principal modes of failure for wooden railroad crossties was conducted and an evaluation of the technical and economic feasibility of refurbishing these ties was conducted. Among the principal modes of structural deterioration, onl...

  20. Overview of refurbishment project of JMTR

    Energy Technology Data Exchange (ETDEWEB)

    Izumo, Hironobu; Hori, Naohiko; Kaminaga, Masanori; Kusunoki, Tsuyoshi; Ishihara, Masahiro; Komori, Yoshihiro; Suzuki, Masahide; Kawamura, Hiroshi [Japan Atomic Energy Agency, Oarai Research and Development Center, Oarai, Ibaraki (Japan)

    2012-03-15

    The refurbishment project of the JMTR from the beginning of JFY 2007 was promoted with two subjects; the one is the replacement of reactor components, and the other is the construction of new irradiation facilities. On the replacement of reactor components, an investigation on aged components (aged-investigation) was carried out, for concrete structures, tanks, tubes in order to identify their integrity. After the investigation, some components were decided to replace from viewpoints of future maintenance and improvement of reliability. On the construction of new irradiation facilities, corresponding to the user's irradiation request, new irradiation facilities, such as irradiation test facilities and equipments for LWRs materials/fuels, were installed in the JMTR. Furthermore, in June 2010, 'birth of the nuclear techno-park with the JMTR' was selected by Japanese Government. The new project is to install new irradiation facilities, such as irradiation facility and equipments for Mo-99 production and PIE equipments to JMTR until JFY2012. The New JMTR will be utilized fully by wide fields of users. Moreover, the JMTR will also contribute the promotion on research and development of the nuclear energy from basic to applied fields as an internationally utilized facility under the international/Asian network collaborations. (author)

  1. OSIRIS. Refurbishment and management of ageing effects

    International Nuclear Information System (INIS)

    Joly, C.; Guidez, J.; Contenson, G. de; Marin, J.P.

    1995-01-01

    OSIRIS, one of the French CEA research reactors (Saclay, France), achieved criticality for the first time on July 1966. During the 29 running years OSIRIS was mainly devoted to production and technological irradiations. To satisfy these objectives, OSIRIS is equipped by different test facilities allowing: the long time irradiation of different material including fuel rods, reactor vessel materials, fusion reactor components; the power ramps of fuel rods; the activation analysis; the neutron-radiography of materials and test sections... All the foreseen irradiation programmes will only be possible if safety and high performances of the reactor are guaranteed. That is why a continuous maintenance and improvement programme has taken place during the whole life of the reactor. This paper gives an overview of this programme, mainly about the part conducted during the last years. Details about characteristics of the reactor, history of experiments, maintenance programme, instrumentation and control system, electrotechnical low voltage supply network, decay tanks and water purification system are summarized. The paper focuses on the refurbishment or the replacement of the main components connected to the continuous maintenance programme to guarantee the reliability, the safety and the high performances of the reactor. (J.S.). 2 refs., 8 figs., 2 tabs

  2. Refurbishment of BR2 (Phase 4 and 5)

    International Nuclear Information System (INIS)

    Gubel, P.; Dekeyser, J.; Van der Auwera, J.

    1998-01-01

    The extensive refurbishment of the BR-2 materials testing reactor should allow another 10 to 15 years of continued operation. The refurbishment programme is required in order to comply with modern safety standards, to enhance the reliability of operation, and to compensate for the ageing of the installations of a facility that has reached about 35 years of intensive service. The main objectives and achievements of phase 4 and 5 are described

  3. Fabrication of high specificity hollow mesoporous silica nanoparticles assisted by Eudragit for targeted drug delivery.

    Science.gov (United States)

    She, Xiaodong; Chen, Lijue; Velleman, Leonora; Li, Chengpeng; Zhu, Haijin; He, Canzhong; Wang, Tao; Shigdar, Sarah; Duan, Wei; Kong, Lingxue

    2015-05-01

    Hollow mesoporous silica nanoparticles (HMSNs) are one of the most promising carriers for effective drug delivery due to their large surface area, high volume for drug loading and excellent biocompatibility. However, the non-ionic surfactant templated HMSNs often have a broad size distribution and a defective mesoporous structure because of the difficulties involved in controlling the formation and organization of micelles for the growth of silica framework. In this paper, a novel "Eudragit assisted" strategy has been developed to fabricate HMSNs by utilising the Eudragit nanoparticles as cores and to assist in the self-assembly of micelle organisation. Highly dispersed mesoporous silica spheres with intact hollow interiors and through pores on the shell were fabricated. The HMSNs have a high surface area (670 m(2)/g), small diameter (120 nm) and uniform pore size (2.5 nm) that facilitated the effective encapsulation of 5-fluorouracil within HMSNs, achieving a high loading capacity of 194.5 mg(5-FU)/g(HMSNs). The HMSNs were non-cytotoxic to colorectal cancer cells SW480 and can be bioconjugated with Epidermal Growth Factor (EGF) for efficient and specific cell internalization. The high specificity and excellent targeting performance of EGF grafted HMSNs have demonstrated that they can become potential intracellular drug delivery vehicles for colorectal cancers via EGF-EGFR interaction. Copyright © 2014 Elsevier Inc. All rights reserved.

  4. Biased Target Ion Beam Deposition and Nanoskiving for Fabricating NiTi Alloy Nanowires

    Science.gov (United States)

    Hou, Huilong; Horn, Mark W.; Hamilton, Reginald F.

    2016-12-01

    Nanoskiving is a novel nanofabrication technique to produce shape memory alloy nanowires. Our previous work was the first to successfully fabricate NiTi alloy nanowires using the top-down approach, which leverages thin film technology and ultramicrotomy for ultra-thin sectioning. For this work, we utilized biased target ion beam deposition technology to fabricate nanoscale (i.e., sub-micrometer) NiTi alloy thin films. In contrast to our previous work, rapid thermal annealing was employed for heat treatment, and the B2 austenite to R-phase martensitic transformation was confirmed using stress-temperature and diffraction measurements. The ultramicrotome was programmable and facilitated sectioning the films to produce nanowires with thickness-to-width ratios ranging from 4:1 to 16:1. Energy dispersive X-ray spectroscopy analysis confirmed the elemental Ni and Ti make-up of the wires. The findings exposed the nanowires exhibited a natural ribbon-like curvature, which depended on the thickness-to-width ratio. The results demonstrate nanoskiving is a potential nanofabrication technique for producing NiTi alloy nanowires that are continuous with an unprecedented length on the order of hundreds of micrometers.

  5. Fabrication of the wing and vertical target dummy armour prototypes of the ITER divertor

    International Nuclear Information System (INIS)

    Grattarola, M.; Bet, M.; Biagiotti, B.; Gandini, G.; Merola, M.; Ottonello, G.B.; Riccardi, B.; Vieider, G.; Zacchia, F.

    2000-01-01

    The dummy armour prototypes are identical to the reference components in terms of geometry, cooling circuit and material except for the armour material, which is replaced by an equivalent thickness of copper alloy. The main objectives of the dummy armour prototypes are the demonstration of the overall engineering concept of the Divertor, the integration in a 3 deg. cassette together with components manufactured by the other ITER Home Teams and the successive thermo-hydraulic tests on the whole Divertor module. This paper describes the realization of both the wing and the vertical target dummy armour prototypes focusing on the critical aspects of the fabrication and their impact on a further industrialization of the components

  6. Fabrication of the wing and vertical target dummy armour prototypes of the ITER divertor

    Energy Technology Data Exchange (ETDEWEB)

    Grattarola, M. E-mail: gratta@ari.ansaldo.it; Bet, M.; Biagiotti, B.; Gandini, G.; Merola, M.; Ottonello, G.B.; Riccardi, B.; Vieider, G.; Zacchia, F

    2000-11-01

    The dummy armour prototypes are identical to the reference components in terms of geometry, cooling circuit and material except for the armour material, which is replaced by an equivalent thickness of copper alloy. The main objectives of the dummy armour prototypes are the demonstration of the overall engineering concept of the Divertor, the integration in a 3 deg. cassette together with components manufactured by the other ITER Home Teams and the successive thermo-hydraulic tests on the whole Divertor module. This paper describes the realization of both the wing and the vertical target dummy armour prototypes focusing on the critical aspects of the fabrication and their impact on a further industrialization of the components.

  7. HRP facility for fabrication of ITER vertical target divertor full scale plasma facing units

    International Nuclear Information System (INIS)

    Visca, Eliseo; Roccella, S.; Candura, D.; Palermo, M.; Rossi, P.; Pizzuto, A.; Sanguinetti, G.P.; Mancini, A.; Verdini, L.; Cacciotti, E.; Cerri, V.; Mugnaini, G.; Reale, A.; Giacomi, G.

    2015-01-01

    Highlights: • R&D activities for the manufacturing of ITER divertor high heat flux plasma-facing components (HHFC). • ENEA and Ansaldo have jointly manufactured several actively cooled monoblock mock-ups and prototypical components. • ENEA and ANSALDO NUCLEARE jointly participate to the European program for the qualification of the manufacturing technology for the ITER divertor IVT. • Successful manufacturing by HRP (Hot Radial Pressing) of first full-scale full-W armored IVT qualification prototype. - Abstract: ENEA and Ansaldo Nucleare S.p.A. (ANN) have being deeply involved in the European development activities for the manufacturing of the ITER Divertor Inner Vertical Target (IVT) plasma-facing components. During normal operation the heat flux deposited on the bottom segment of divertor is 5–10 MW/m 2 but the capability to remove up to 20 MW/m 2 during transient events of 10 s must also be demonstrated. In order to fulfill ITER requirements, ENEA has set up and widely tested a manufacturing process, named Hot Radial Pressing (HRP). The last challenge is now to fabricate full-scale prototypes of the IVT, aimed to be qualified for the next step, i.e. the series production. On the basis of the experience of manufacturing hundreds of small mock-ups, ENEA designed and installed a new suitable HRP facility. The objective of getting a final shaped plasma facing unit (PFU) that satisfies these requirements is an ambitious target because tolerances set by ITER/F4E are very tight. The setting-up of the equipment started with the fabrication of full scale and representative ‘dummies’ in which stainless steel instead of CFC or W was used for monoblocks. The results confirmed that dimensions were compliant with the required tolerances. The paper reports a brief description of the innovative HRP equipment and the dimensional check results after HRP of the first full-scale full-W PFU.

  8. HRP facility for fabrication of ITER vertical target divertor full scale plasma facing units

    Energy Technology Data Exchange (ETDEWEB)

    Visca, Eliseo, E-mail: eliseo.visca@enea.it [Unità Tecnica Fusione, ENEA C. R. Frascati, via E. Fermi 45, IT-00044 Frascati (Roma) (Italy); Roccella, S. [Unità Tecnica Fusione, ENEA C. R. Frascati, via E. Fermi 45, IT-00044 Frascati (Roma) (Italy); Candura, D.; Palermo, M. [Ansaldo Nucleare S.p.A., Corso Perrone 25, IT-16152 Genova (Italy); Rossi, P.; Pizzuto, A. [Unità Tecnica Fusione, ENEA C. R. Frascati, via E. Fermi 45, IT-00044 Frascati (Roma) (Italy); Sanguinetti, G.P. [Ansaldo Nucleare S.p.A., Corso Perrone 25, IT-16152 Genova (Italy); Mancini, A.; Verdini, L.; Cacciotti, E.; Cerri, V.; Mugnaini, G.; Reale, A.; Giacomi, G. [Unità Tecnica Fusione, ENEA C. R. Frascati, via E. Fermi 45, IT-00044 Frascati (Roma) (Italy)

    2015-10-15

    Highlights: • R&D activities for the manufacturing of ITER divertor high heat flux plasma-facing components (HHFC). • ENEA and Ansaldo have jointly manufactured several actively cooled monoblock mock-ups and prototypical components. • ENEA and ANSALDO NUCLEARE jointly participate to the European program for the qualification of the manufacturing technology for the ITER divertor IVT. • Successful manufacturing by HRP (Hot Radial Pressing) of first full-scale full-W armored IVT qualification prototype. - Abstract: ENEA and Ansaldo Nucleare S.p.A. (ANN) have being deeply involved in the European development activities for the manufacturing of the ITER Divertor Inner Vertical Target (IVT) plasma-facing components. During normal operation the heat flux deposited on the bottom segment of divertor is 5–10 MW/m{sup 2} but the capability to remove up to 20 MW/m{sup 2} during transient events of 10 s must also be demonstrated. In order to fulfill ITER requirements, ENEA has set up and widely tested a manufacturing process, named Hot Radial Pressing (HRP). The last challenge is now to fabricate full-scale prototypes of the IVT, aimed to be qualified for the next step, i.e. the series production. On the basis of the experience of manufacturing hundreds of small mock-ups, ENEA designed and installed a new suitable HRP facility. The objective of getting a final shaped plasma facing unit (PFU) that satisfies these requirements is an ambitious target because tolerances set by ITER/F4E are very tight. The setting-up of the equipment started with the fabrication of full scale and representative ‘dummies’ in which stainless steel instead of CFC or W was used for monoblocks. The results confirmed that dimensions were compliant with the required tolerances. The paper reports a brief description of the innovative HRP equipment and the dimensional check results after HRP of the first full-scale full-W PFU.

  9. Simulated thermal energy demand and actual energy consumption in refurbished and non-refurbished buildings

    Science.gov (United States)

    Ilie, C. A.; Visa, I.; Duta, A.

    2016-08-01

    The EU legal frame imposes the Nearly Zero Energy Buildings (nZEB) status to any new public building starting with January 1st, 2019 and for any other new building starting with 2021. Basically, nZEB represents a Low Energy Building (LEB) that covers more than half of the energy demand by using renewable energy systems installed on or close to it. Thus, two steps have to be followed in developing nZEB: (1) reaching the LEB status through state- of-the art architectural and construction solutions (for the new buildings) or through refurbishing for the already existent buildings, followed by (2) implementing renewables; in Romania, over 65% of the energy demand in a building is directly linked to heating, domestic hot water (DHW), and - in certain areas - for cooling. Thus, effort should be directed to reduce the thermal energy demand to be further covered by using clean and affordable systems: solar- thermal systems, heat pumps, biomass, etc. or their hybrid combinations. Obviously this demand is influenced by the onsite climatic profile and by the building performance. An almost worst case scenario is approached in the paper, considering a community implemented in a mountain area, with cold and long winters and mild summers (Odorheiul Secuiesc city, Harghita county, Romania). Three representative types of buildings are analysed: multi-family households (in blocks of flats), single-family houses and administrative buildings. For the first two types, old and refurbished buildings were comparatively discussed.

  10. Refurbishment decision support tools review—Energy and life cycle as key aspects to sustainable refurbishment projects

    International Nuclear Information System (INIS)

    Ferreira, Joaquim; Pinheiro, Manuel Duarte; Brito, Jorge de

    2013-01-01

    Europe is facing one of its most challenging crises since Great Depression and the construction sector is one of the worst affected. Refurbishment is therefore often suggested as one of the most useful solutions for the current real estate crisis in consolidated areas like the EU. On the other hand, it is imperative to construct buildings according to sustainable principles regarding economic, environmental and social issues. Therefore, proper decision-support methods are needed to help designers, investors and policy makers to choose the most sustainable solution for a refurbishment project, especially for energy retrofit works. This paper reviews the works relating to sustainable refurbishment decision-support tools which have already been developed. For this purpose we have analysed and classified 40 different methods, with particular focus on their main common aims. They are also compared with other classifications proposed. This paper further highlights the role of energy as a driving factor and discusses what other research developments are needed to create related tools for the future that could respond to actual construction requirements. - Highlights: • Sustainable refurbishment as an important challenge. • Proper decision-support methods are needed to refurbishment. • The paper reviews 40 different methods, focusing their main common aims. • The paper highlights the role of the energy as key factor to search sustainability. • It also stresses the importance of life cycle approach in refurbishment projects

  11. Gentilly-2 refurbishment pre-project

    International Nuclear Information System (INIS)

    Pageau, Rene; Doyon, Martial; Rheaume, M.R.

    2002-01-01

    The conceptual design life of Gentilly-2 station is 30 years and the station was put in service in 1982. Hydro-Quebec has initiated a project to assess the refurbishment of the station in the horizon 2008-2010 and for an expected life extension of 25 years. The reactor has been successfully operated since its first full-power operation in early 80's, nearly 20 years ago. Although the overall performance of Gentilly-2 continues to be very good, it is reasonable to expect that age-related degradation of key plant components will have an increasing impact on operations as the plant continues to age. The replacement of the reactor channels component is required around 2008-2009. The replacement of the reactor tubes is a major activity and it is necessary to assess the capability of the station to operate safely and reliably for a an extended period of 25 years bringing the design life of the station to over 50 years. The challenges associated with extended life operation until at least 2030-33 horizon are to maintain the margin of safety for plant operations by ensuring reliability of safety-related systems, to reduce plant unavailability due to age-related component failures, and to minimize the costs for repairs and replacement of aging components. As shown on the next figure, the overall project is expected to spread over an 8 years period starting in 2001. A project feasibility study (phase-1) of four (4) years has been planned to assess the plant condition and to make an overall safety review. This project phase will confirm the economical viability of extended operation. A period of thirty-nine (39) months would be necessary for the procurement and manufacturing of all the reactor components, and for the engineering work related to safety and economic improvements. Reactor channel replacement is planned for an outage not exceeding 18 months. (author)

  12. Conception and fabrication of innovative Am-Based targets: the ca mix/Cochix experiment

    International Nuclear Information System (INIS)

    Schmidt, N.; Croixmarie, Y.; Abonneau, E.; Ottaviani, J.P.; Donnet, L.; Desmouliere, F.; Konings, R.J.M.; Fernandez, A.

    2003-01-01

    A large experimental programme has been planned to be carried out in the French PHENIX reactor. The purpose is to evaluate the technical feasibility of minor actinide transmutation in fast reactors. Two major series of experiments have been designed for the heterogeneous transmutation mode. The first one, the MATINA (Matrices for Incineration of Actinides) series, aims at testing both different inert matrices in a fast flux and different concepts. The study is generic and focuses on the material behaviour under representative irradiation conditions. Targets are free of minor actinides to make the fabrication and design steps easier and faster. The second one, ECRIX, CAMIX (Compounds of Americium in PHENIX) and COCHIX (Concept Optimized microstructure in PHENIX), is a further step in the demonstration phase of the ''once-through'' transmutation and deals with Am-bearing targets irradiated in a fast neutron spectrum ''locally'' moderated. The moderator materials tested will be calcium hydride CaH 2-x (cases of ECRIX-H, CAMIX and COCHIX) and boron carbide 11 B 4 C (case of ECRIX-B) in order to accelerate the process of transmutation significantly. (author)

  13. Inertial confinement fusion target component fabrication and technology development support: Annual report, October 1, 1997 - September 30, 1998

    International Nuclear Information System (INIS)

    Gibson, J.

    1998-12-01

    During this period, General Atomics (GA) and their partner Schafer Corporation were assigned 17 formal tasks in support of the Inertial Confinement Fusion (ICF) program and its five laboratories. A portion of the effort on these tasks included providing direct ''On-site Support'' at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), and Sandia National Laboratory Albuquerque (SNLA). They fabricated and delivered over 1,200 hohlraum mandrels and numerous other micromachined components to LLNL, LANL, and SNLA. They produced more than 1,300 glass and plastic target capsules for LLNL, LANL, SNLA, and the University of Rochester/Laboratory for Laser Energetics (UR/LLE). They also delivered nearly 2,000 various target foils and films for Naval Research Lab (NRL) and UR/LLE in FY98. This report describes these target fabrication activities and the target fabrication and characterization development activities that made the deliveries possible. During FY98, great progress was made by the GA/Schafer-UR/LLE-LANL team in the design, procurement, installation, and testing of the OMEGA Cryogenic Target System (OCTS) that will field cryogenic targets on OMEGA. The design phase was concluded for all components of the OCTS and all major components were procured and nearly all were fabricated. Many of the components were assembled and tested, and some have been shipped to UR/LLE. The ICF program is anticipating experiments at the OMEGA laser and the National Ignition Facility (NIF) which will require targets containing cryogenic layered D 2 or deuterium-tritium (DT) fuel. They are part of the National Cryogenic Target Program and support experiments at LLNL and LANL to generate and characterize cryogenic layers for these targets. They also contributed cryogenic support and developed concepts for NIF cryogenic targets. This report summarizes and documents the technical progress made on these tasks

  14. Inertial confinement fusion target component fabrication and technology development support: Annual report, October 1, 1997--September 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    Gibson, J. [ed.

    1998-12-01

    During this period, General Atomics (GA) and their partner Schafer Corporation were assigned 17 formal tasks in support of the Inertial Confinement Fusion (ICF) program and its five laboratories. A portion of the effort on these tasks included providing direct ``On-site Support`` at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), and Sandia National Laboratory Albuquerque (SNLA). They fabricated and delivered over 1,200 hohlraum mandrels and numerous other micromachined components to LLNL, LANL, and SNLA. They produced more than 1,300 glass and plastic target capsules for LLNL, LANL, SNLA, and the University of Rochester/Laboratory for Laser Energetics (UR/LLE). They also delivered nearly 2,000 various target foils and films for Naval Research Lab (NRL) and UR/LLE in FY98. This report describes these target fabrication activities and the target fabrication and characterization development activities that made the deliveries possible. During FY98, great progress was made by the GA/Schafer-UR/LLE-LANL team in the design, procurement, installation, and testing of the OMEGA Cryogenic Target System (OCTS) that will field cryogenic targets on OMEGA. The design phase was concluded for all components of the OCTS and all major components were procured and nearly all were fabricated. Many of the components were assembled and tested, and some have been shipped to UR/LLE. The ICF program is anticipating experiments at the OMEGA laser and the National Ignition Facility (NIF) which will require targets containing cryogenic layered D{sub 2} or deuterium-tritium (DT) fuel. They are part of the National Cryogenic Target Program and support experiments at LLNL and LANL to generate and characterize cryogenic layers for these targets. They also contributed cryogenic support and developed concepts for NIF cryogenic targets. This report summarizes and documents the technical progress made on these tasks.

  15. Fabrication Method of the Mo-99 Target with Advanced Planar Flow Casting

    Energy Technology Data Exchange (ETDEWEB)

    Sim, M. S.; Lee, J. H. [Chungnam University, Green Energy Technology, Daejeon (Korea, Republic of); Kim, C. K.; Woo, Y. M. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2011-05-15

    Mo-99 is a parent isotope of Tc-99m for medical diagnosis and very significant owing to its large fraction over 80% of the whole demand of medical radioisotopes in the all countries. Mo-99 isotope has been produced mainly by {sup 235}U which is extracting fission products. All the major providers of fission Mo have used HEU as a target material. But RERTR program that is non-proliferation policy encourages using HEU to LEU. KAERI has developed a processing to be able to produce a uranium foil continuously at one go. This processing gave an opportunity for LEU target using uranium foil to be commercialized. It correspond RERTR program. KAERI developed a new process of making foil directly from uranium melt by PFC. This process is simple, productive, and cost-effective. But the foil{center_dot}{center_dot}{center_dot}s air-side surface is generally very rough. A typical transverse cross section had a minimum thickness of 65 {mu}m and a maximum thickness of 205 {mu}m. This roughness could affect target fabrication and irradiation behavior. After issuing this problem KAERI launched a further effort since 2008. A new equipment was designed and manufactured in the industry in 2009. While the new equipment being test-operating, some occurrence of appearing problems appeared. Since 2010, Equipment was moved to KAERI, we performed many experiments using depleted uranium, and go get satisfied some results. We have got interesting results and manufactured uranium foil. A typical transverse cross section had a minimum thickness of 87 {mu}m and a maximum thickness of 194 {mu}m. However, the average thickness is 130 {mu}m as a result of measurement by a micrometer

  16. Fabrication Method of the Mo-99 Target with Advanced Planar Flow Casting

    International Nuclear Information System (INIS)

    Sim, M. S.; Lee, J. H.; Kim, C. K.; Kim, W. J.

    2011-01-01

    Mo-99 is a parent isotope of Tc-99m for medical diagnosis and very significant owing to its large fraction over 80% of the whole demand of medical radioisotopes in the all countries. Mo-99 isotope has been produced mainly by 235 U which is extracting fission products. All the major providers of fission Mo have used HEU as a target material. But RERTR program that is nonproliferation policy encourages using HEU to LEU. KAERI has developed a processing to be able to produce a uranium foil continuously at one go. This processing gave an opportunity for LEU target using uranium foil to be commercialized. It correspond RERTR program. KAERI developed a new process of making foil directly from uranium melt by PFC. This process is simple, productive, and cost-effective. But the foil's air-side surface is generally very rough. A typical transverse cross section had a minimum thickness of 65 μm and a maximum thickness of 205 μm. This roughness could affect target fabrication and irradiation behavior. After issuing this problem KAERI launched a further effort since 2008. A new equipment was designed and manufactured in the industry in 2009. While the new equipment being test-operating, some occurrence of appearing problems appeared. Since 2010, Equipment was moved to KAERI, we performed many experiments using depleted uranium, and go get satisfied some results. We have got interesting results and manufactured uranium foil. A typical transverse cross section had a minimum thickness of 87 μm and a maximum thickness of 194 μm. The average thickness is 120 μm as a result of calculation

  17. Inertial confinement fusion target component fabrication and technology development support: Annual report, October 1, 1995--September 30, 1996

    International Nuclear Information System (INIS)

    Hoppe, M.

    1997-02-01

    On December 30, 1990, the U.S. Department of Energy entered into a contract with General Atomics (GA) to be the Inertial Confinement Fusion (ICF) Target Component Fabrication and Technology Development Support contractor. In September 1995 this contract ended and a second contract was issued for us to continue this ICF target support work. This report documents the technical activities of the period October 1, 1995 through September 30, 1996. During this period, GA and our partners WJ Schafer Associates (WJSA) and Soane Technologies, Inc. (STI) were assigned 14 formal tasks in support of the Inertial Confinement Fusion program and its five laboratories. A portion of the effort on these tasks included providing direct open-quotes Onsite Supportclose quotes at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), and Sandia National Laboratory Albuquerque (SNLA). We fabricated and delivered over 800 gold-plated hohlraum mandrels to LLNL, LANL and SNLA. We produced nearly 1,200 glass and plastic target capsules for LLNL, LANL, SNLA and University of Rochester/Laboratory for Laser Energetics (UR/LLE). We also delivered over 100 flat foil targets for Naval Research Lab (NRL) and SNLA in FY96. This report describes these target fabrication activities and the target fabrication and characterization development activities that made the deliveries possible. The ICF program is anticipating experiments at the OMEGA laser and the National Ignition Facility (NIF) which will require capsules containing cryogenic layered D 2 or deuterium-tritium (DT) fuel. We are part of the National Cryogenic Target Program to create and demonstrate viable ways to generate and characterize cryogenic layers. Substantial progress has been made on ways to both create and characterize viable layers. During FY96, significant progress was made in the design of the OMEGA Cryogenic Target System that will field cryogenic targets on OMEGA

  18. Loading Deformation Characteristic Simulation Study of Engineering Vehicle Refurbished Tire

    Science.gov (United States)

    Qiang, Wang; Xiaojie, Qi; Zhao, Yang; Yunlong, Wang; Guotian, Wang; Degang, Lv

    2018-05-01

    The paper constructed engineering vehicle refurbished tire computer geometry model, mechanics model, contact model, finite element analysis model, did simulation study on load-deformation property of engineering vehicle refurbished tire by comparing with that of the new and the same type tire, got load-deformation of engineering vehicle refurbished tire under the working condition of static state and ground contact. The analysis result shows that change rules of radial-direction deformation and side-direction deformation of engineering vehicle refurbished tire are close to that of the new tire, radial-direction and side-direction deformation value is a little less than that of the new tire. When air inflation pressure was certain, radial-direction deformation linear rule of engineer vehicle refurbished tire would increase with load adding, however, side-direction deformation showed linear change rule, when air inflation pressure was low; and it would show increase of non-linear change rule, when air inflation pressure was very high.

  19. Engineering study radioactive liquid waste treatment plant refurbishment

    International Nuclear Information System (INIS)

    Suazo, I.L.

    1994-01-01

    This feasibility study will investigate the opportunities, restrictions and cost impact to refurbish the existing Radioactive Liquid Waste Treatment Plant (RLWTP) while utilizing the same basic criteria that was used in the development of the new Radioactive Liquid Waste Treatment Facility (RLWTF). The objective of this study is to perform a more in-depth analysis of refurbishing the existing than has been done in the past so as to provide a basis for comparison between refurbishing the existing or constructing a new. The existing plant is located at Technical Area 50 (TA-50) within the Los Alamos National Laboratory (LANL). The initial structure was built in 1963. Over the ensuing years, the building has been modified and several additions have been constructed. In 1966, laboratories, ion exchange and pretreatment functions were added. The decontamination and decommissioning activities and ventilation equipment were added in 1984. The following assumptions are the basic parameters considered in the development of a design concept to refurbish the RLWTP: (1) Allow continued operation of the during retrofit construction. (2) Design the necessary expansion within the site constraints. (3) Satisfy National Pollutant Discharge Elimination System (NPDES) and National Emission Standards for Hazardous Air Pollutants (NESHAPS) permit conditions and other environmental regulations. (4) Comply with present DOE Orders and building code requirements. The refurbishment concept is a phased demolition and construction process

  20. Refurbishment and safety upgradation of research reactor Cirus

    International Nuclear Information System (INIS)

    Marik, S.K.; Rao, D.V.H.; Bhatnagar, A.; Pant, R.C.; Tikku, A.C.; Sankar, S.

    2006-01-01

    Cirus, a 40 MW t, vertical tank type research reactor, having wide range of research facilities, was commissioned in the year 1960. This research reactor, situated at Mumbai, India has been operated and utilized extensively for isotope production, material testing and neutron beam research for nearly four decades. With a view to assess the residual life of the reactor, detailed ageing studies were carried out during the early 1990s. Based on these studies, refurbishment of Cirus for its life extension was taken up. During refurbishment, additional safety features were incorporated in various systems to qualify them for the current safety standards. This paper gives the details of the operating experiences, utilization of the reactor along with methodologies followed for carrying out detailed ageing studies, refurbishment and safety upgradation for its life extension

  1. Impact of flow accelerated corrosion (FAC) on feeder refurbishment planning

    International Nuclear Information System (INIS)

    Jyrkama, M.; Pandey, M.

    2010-01-01

    Feeder wall thinning due to flow accelerated corrosion (FAC) may result in a large number of feeder replacements in the future. In this study, the process of FAC is modelled using a probabilistic approach and used to predict the expected number of degraded feeders and their replacements in the future. Because of the high cost associated with feeder replacements, it may be optimal to replace the entire feeder population during a single refurbishment outage when the unit cost of replacement is likely to be less. The results of this study demonstrate, however, that the unit cost of feeder replacement must be sufficiently lower than the standard replacement cost and the refurbishment performed at an optimal time to realize the economic benefits associated with the refurbishment. (author)

  2. Development of an improved low profile hub seal refurbishment tool

    International Nuclear Information System (INIS)

    Wagg, L.

    1997-01-01

    The hub seal area of a fuel channel feeder coupling can be exposed to oxygen in the atmosphere if protective measures are not taken during maintenance outages. Exposure to oxygen can lead to pitting of the hub seal area. Although this is a rare occurrence, the resulting possibility of the feeder coupling leakage led to the development of a feeder hub refurbishment tool. To reduce time and man-rem exposure during feeder hub seal refurbishment, an improved low profile hub seat refurbishing tool has been developed. The improved tool design will allow for quick and controlled removal of material, and the restoration of a roll-burnished finish equivalent to the original requirements. The new tool can be used in maintenance operations, with the end fitting present, as well as under retube-type circumstances, with the end fitting removed. (author)

  3. Refurbishment and replacement efforts to mitigate ageing at Tarapur Atomic Power Station - an overview

    International Nuclear Information System (INIS)

    Katiyar, S.C.; Thattey, V.; Das, P.K.

    2006-01-01

    Tarapur Atomic Power Station (TAPS) - a twin Boiling Water Reactor unit and India's first Atomic Power Station was commissioned in April 1969, and was declared commercial in November 1969. Since then the light water moderated, low enriched uranium BWR with its demonstrated reliability and favourable economics is playing a vital role as a reliable source of power for the states of Maharashtra and Gujarat. The Power Station played a key role as a technology demonstrator validating the nuclear energy as safe and environmentally benign and economically viable alternate source of power generation in India. Built in the late sixties with state-of-the-art safety features prevailing then, TAPS has further evolved to be a safe plant with renovation and refurbishment efforts. Ageing Management Programme is in place at TAPS. Identification of systems, structures and components (SSCs) important to safety and availability, assessment of ageing degradation of these SSCs and mitigation through repair, replacement and refurbishment based on the investigations have enhanced the plant safety and reliability. The station's operating experience and feedback from BWRs operating abroad have also given inputs to Ageing Management Programme. A good number of major equipment have been replaced to mitigate ageing. Primary system piping, process heat exchangers, feed water heaters, turbine extraction system piping, turbine blades, emergency condenser tube bundles, various pumps, station batteries, electrical cables, circuit breakers etc. are some of them. Obsolescence is another aspect of ageing of a plant. Replacement of obsolete equipment and components particularly in C and I is another area where much headway has been made. Replacement and refurbishment of equipment have been done after detailed study and analysis so that current standards are met. Retrofitting the indigenously developed and fabricated equipment in a compact plant like TAPS was a difficult task and required lot of

  4. The BR2 refurbishment: from concept to achievements

    International Nuclear Information System (INIS)

    Gubel, P.

    2002-01-01

    The BR2 reactor is one of the major research reactors in the world. It's operation started in the early 1960's. Two major refurbishments operation have been carried out since then. The report gives an overview of the methodology and inspections, which resulted in a refurbishment action plan. The main realizations and complementary actions required by the Licensing Authorities are summarized. Finally the operation experience feedback, four years now after start-up, is briefly discussed as well as the main aspects of the present safety reassessment [ru

  5. Rotor pole refurbishment for hydrogenerators: insulation problems and solutions

    International Nuclear Information System (INIS)

    Reynolds, R.R.; Rux, L.

    2005-01-01

    Rotor poles for Unit 1 at Lower Granite Powerhouse were removed from the rotor and shipped to a repair facility for refurbishment. Upon inspection, it was found that all of the pole bodies exhibited a distinct bow, center to end, on the pole mounting surface. In some cases, the deflection was as much as 0.106 inch. Concerns were raised about how this condition might affect the ability to properly insulate and/or re-seat the poles. This paper presents details of the rotor pole and field winding evaluation, the problems encountered, and the solutions implemented to successfully refurbish the rotor poles and field winding. (author)

  6. Refurbishment and safety up-gradation of Cirus Reactor

    International Nuclear Information System (INIS)

    Rao, D.V.H.

    2004-01-01

    Cirus, a 40 MWth, vertical tank type research reactor, having a wide range of research facilities, was commissioned in 1960. This research facility has been operated and utilized extensively for nearly four decades. With a view to assess the residual life of the reactor, detailed ageing studies were carried out. Based on this, refurbishment work for life extension was undertaken. During this work, additional safety features were incorporated to improve the overall safety of the reactor. This lecture details the methodologies used for ageing studies and refurbishment activities for life extension with enhanced safety. (author)

  7. Utility-vendor partnerships for refurbishment projects

    Energy Technology Data Exchange (ETDEWEB)

    Newman, G.; Hall, H. [Bruce Power, Tiverton, Ontario (Canada)

    2012-07-01

    closely with our Vendor community to ensure that our policies, programs and procedures are rigorous, transparent and well understood such that these requirements can be implemented in a timely and cost effective manner. At Bruce Power we value the skills and products that our Vendor community brings to our business and it is our intention to work carefully through this process to ensure that we collectively achieve the quality level required to ensure safe, reliable operation of our plants. In the context of Utility – Vendor Partnerships from a commercial perspective; Bruce Power has established a Vendor Performance Management System (VPMS) to support a structured approach to identify supplier strengths and weaknesses and to assist in the selection and management of our vendor base. Utilizing field initiated Station Condition Reports (SCR’s) and Non Conformance Reports (NCR’s) to establish good, average and substandard performance data points by commodity and contract, the VPMS facilitates data mining of performance information to establish a profile of how a supplier performs. SCR’s and NCR’s are backstopped by commercially generated SCAR Supplier Corrective Action Reports which allows Bruce Power to monitor vendor corrective actions.The VPMS approach permits Bruce Power to have a data based evaluation vs. an opinion based performance scorecard. Although in it’s preliminary stages this system will eventually help Bruce Power verify by commodity how vendors are performing which will in turn allow Bruce Power to enable an exit strategy for a poor performing vendor while strategically developing vendors to fill identified gaps. This capability will act as a cornerstone segment in our approach to Utility – Vendor Partnerships for Refurbishment by establishing performance data points on cost, quality and schedule delivery. Our success in being able to strategically apply this model will depend upon stable outage, generation and capital improvement plans as well

  8. Utility-vendor partnerships for refurbishment projects

    International Nuclear Information System (INIS)

    Newman, G.; Hall, H.

    2012-01-01

    closely with our Vendor community to ensure that our policies, programs and procedures are rigorous, transparent and well understood such that these requirements can be implemented in a timely and cost effective manner. At Bruce Power we value the skills and products that our Vendor community brings to our business and it is our intention to work carefully through this process to ensure that we collectively achieve the quality level required to ensure safe, reliable operation of our plants. In the context of Utility – Vendor Partnerships from a commercial perspective; Bruce Power has established a Vendor Performance Management System (VPMS) to support a structured approach to identify supplier strengths and weaknesses and to assist in the selection and management of our vendor base. Utilizing field initiated Station Condition Reports (SCR’s) and Non Conformance Reports (NCR’s) to establish good, average and substandard performance data points by commodity and contract, the VPMS facilitates data mining of performance information to establish a profile of how a supplier performs. SCR’s and NCR’s are backstopped by commercially generated SCAR Supplier Corrective Action Reports which allows Bruce Power to monitor vendor corrective actions.The VPMS approach permits Bruce Power to have a data based evaluation vs. an opinion based performance scorecard. Although in it’s preliminary stages this system will eventually help Bruce Power verify by commodity how vendors are performing which will in turn allow Bruce Power to enable an exit strategy for a poor performing vendor while strategically developing vendors to fill identified gaps. This capability will act as a cornerstone segment in our approach to Utility – Vendor Partnerships for Refurbishment by establishing performance data points on cost, quality and schedule delivery. Our success in being able to strategically apply this model will depend upon stable outage, generation and capital improvement plans as well

  9. Inertial confinement fusion target component fabrication and technology development support. Annual report, October 1, 1996 - September 30, 1997

    International Nuclear Information System (INIS)

    Gibson, J.

    1998-03-01

    This report documents the technical activities of the period October 1, 1996 through September 30, 1997. During this period, GA and their partner Schafer Corporation were assigned 13 formal tasks in support of the ICF program and its five laboratories. A portion of the effort on these tasks included providing direct open-quotes Onsite Supportclose quotes at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), and Sandia National Laboratory Albuquerque (SNLA). Over 700 gold-plated hohlraum mandrels were fabricated and delivered to LLNL, LANL and SNLA. More than 1600 glass and plastic target capsules were produced for LLNL, LANL, SNLA and University of Rochester/Laboratory for Laser Energetics (UR/LLE). Nearly 2000 various target foils and films were delivered for Naval Research Lab (NRL) and UR/LLE in FY97. This report describes these target fabrication activities and the target fabrication and characterization development activities that made the deliveries possible. The ICF program is anticipating experiments at the OMEGA laser and the National Ignition Facility (NIF) which will require targets containing cryogenic layered D 2 or deuterium-tritium (DT) fuel. This project is part of the National Cryogenic Target Program and support experiments at LLNL and LANL to generate and characterize cryogenic layers for these targets. During FY97, significant progress was made in the design and component testing of the OMEGA Cryogenic Target System that will field cryogenic targets on OMEGA. This included major design changes, reduction in equipment, and process simplifications. This report summarizes and documents the technical progress made on these tasks

  10. Inertial confinement fusion target component fabrication and technology development support. Annual report, October 1, 1996--September 30, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Gibson, J. [ed.

    1998-03-01

    This report documents the technical activities of the period October 1, 1996 through September 30, 1997. During this period, GA and their partner Schafer Corporation were assigned 13 formal tasks in support of the ICF program and its five laboratories. A portion of the effort on these tasks included providing direct {open_quotes}Onsite Support{close_quotes} at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), and Sandia National Laboratory Albuquerque (SNLA). Over 700 gold-plated hohlraum mandrels were fabricated and delivered to LLNL, LANL and SNLA. More than 1600 glass and plastic target capsules were produced for LLNL, LANL, SNLA and University of Rochester/Laboratory for Laser Energetics (UR/LLE). Nearly 2000 various target foils and films were delivered for Naval Research Lab (NRL) and UR/LLE in FY97. This report describes these target fabrication activities and the target fabrication and characterization development activities that made the deliveries possible. The ICF program is anticipating experiments at the OMEGA laser and the National Ignition Facility (NIF) which will require targets containing cryogenic layered D{sub 2} or deuterium-tritium (DT) fuel. This project is part of the National Cryogenic Target Program and support experiments at LLNL and LANL to generate and characterize cryogenic layers for these targets. During FY97, significant progress was made in the design and component testing of the OMEGA Cryogenic Target System that will field cryogenic targets on OMEGA. This included major design changes, reduction in equipment, and process simplifications. This report summarizes and documents the technical progress made on these tasks.

  11. Fabrication and characterization of UV-emitting nanoparticles as novel radiation sensitizers targeting hypoxic tumor cells

    Science.gov (United States)

    Squillante, Michael R.; Jüstel, Thomas; Anderson, R. Rox; Brecher, Charles; Chartier, Daniel; Christian, James F.; Cicchetti, Nicholas; Espinoza, Sara; McAdams, Daniel R.; Müller, Matthias; Tornifoglio, Brooke; Wang, Yimin; Purschke, Martin

    2018-06-01

    Radiation therapy is one of the primary therapeutic techniques for treating cancer, administered to nearly two-thirds of all cancer patients. Although largely effective in killing cancer cells, radiation therapy, like other forms of cancer treatment, has difficulty dealing with hypoxic regions within solid tumors. The incomplete killing of cancer cells can lead to recurrence and relapse. The research presented here is investigating the enhancement of the efficacy of radiation therapy by using scintillating nanoparticles that emit UV photons. UV photons, with wavelengths between 230 nm and 280 nm, are able to inactivate cells due to their direct interaction with DNA, causing a variety of forms of damage. UV-emitting nanoparticles will enhance the treatment in two ways: first by generating UV photons in the immediate vicinity of cancer cells, leading to direct and oxygen-independent DNA damage, and second by down-converting the applied higher energy X-rays into softer X-rays and particles that are more efficiently absorbed in the targeted tumor region. The end result will be nanoparticles with a higher efficacy in the treatment of hypoxic cells in the tumor, filling an important, unmet clinical need. Our preliminary experiments show an increase in cell death using scintillating LuPO4:Pr nanoparticles over that achieved by the primary radiation alone. This work describes the fabrication of the nanoparticles, their physical characterization, and the spectroscopic characterization of the UV emission. The work also presents in vitro results that demonstrate an enhanced efficacy of cell killing with x-rays and a low unspecific toxicity of the nanoparticles.

  12. Steam generator life-management, reliability, maintenance and refurbishment

    International Nuclear Information System (INIS)

    Spekkens, P.

    2012-01-01

    SGC 2012 is a different kind of a conference - it has its own focus, initiatives and objectives and differs from its predecessors. It originated as the Steam Generator and Heat Exchanger Conference in 1990 - a time when premature degradation of steam generators with Alloy 600 tubes was rampant world-wide, and some CANDU steam generators had started to experience significant fouling and corrosion issues. The six previous steam generator conferences were held on a regular cycle, in a very similar format and with a similar theme. We are now in a different era in steam generators. The Alloy 600 tubing has been largely replaced by more robust materials, and the CANDU steam generators have been brought under much more intense and effective life cycle management. Performance of steam generators has improved greatly, and they are no longer considered at risk of limiting the life of the units. Indeed, most Incoloy 800 steam generators in CANDU units are considered to be capable of operating reliably through the 'second life' of the units and are not being replaced during refurbishments. Given this changing environment, the scope of this conference has been expanded from one to three areas: steam generators and heat exchangers as before, but also; controls, valves and pumps, and; reactor components and systems, Programs A, B and C, respectively. The conference is targeting to address the needs and interests of the operating utilities, and to 'focus on what needs attention'. As a means of 'focusing on what needs attention' an 'Issue-Identification and Definition' program was initiated last winter. The Issue-Identification Team operating with COG President Bob Morrison as its Executive Lead, worked to identify issues requiring attention in the three areas of interest. Of the many issues identified by the Team and elaborated on by the Program Developers of this conference, four were recommended for special attention: A. 'Operate Clean - Build Clean - Plant Wide': Despite their

  13. Darlington refurbishment - performance improvement programs goals and experience

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, N. [Ontario Power Generation, Toronto, ON (Canada)

    2015-07-01

    This paper discusses the refurbishment program at the Darlington site. The program focuses on safety, integrity, excellence and personnel. Worker safety and public safety are of the highest priority. Success resulted from collaborative engineering interface, collaborative front end planning, highly competent people and respectful relationship with partners and regulators.

  14. Refurbishment of the NPP Dukovany I and C System

    International Nuclear Information System (INIS)

    Karpeta, C.; Rosol, J.

    2004-01-01

    An overview of the NPP Dukovany Instrumentation and Control (I and C) refurbishment project is presented in this paper from the standpoint of both its management and technical aspects. Reasons for taking the decision to replace the original plant I and C system are outlined and the objectives set for the refurbishment project are stated. The paper is focusing on describing more in detail the first part of the refurbishment, i.e. replacement of the I and C portions of the plant systems important to nuclear safety and the process information system. This includes the reactor trip system, engineered safety features actuation system, reactor power limitation system, reactor power control system, post-accident monitoring system, reactor core monitoring system and unit data acquisition and processing system. Information is given on the main processes of the project, i.e. the bidding, design, manufacturing, installation and commissioning. Specific licensing process applied to this refurbishment project is also outlined. An account of the current status of the project implementation is given. (author)

  15. Analysis of Factors Influencing Building Refurbishment Project Performance

    Directory of Open Access Journals (Sweden)

    Ishak Nurfadzillah

    2018-01-01

    Full Text Available Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project’s performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs and complexity factors (CFs during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  16. IEC 61850 based refurbishment strategies for protection and automation systems

    Energy Technology Data Exchange (ETDEWEB)

    Tholomier, D. [Areva T and D Automation Canada Inc., Monteal, PQ (Canada); Hossenlopp, L. [Areva T and D Automation Inc., Paris (France); Apostolov, A. [Omicron Electronics, Houston, TX (United States)

    2008-07-01

    Electric utilities are currently facing the challenge of refurbishing aging transmission networks and power system infrastructure at a time of severe economic, environmental and competitive constraints. This paper addressed the issue of an appropriate approach to retrofit the hardware and software of substation secondary systems, and how IEC standards could be used to set up a long term strategy. The first part of the paper considered an asset management strategy for refurbishing substation secondary systems, while the second part of the paper addressed the strategies for refurbishing existing power plants. The final section of the paper analyzed refurbishment strategies designed to protect power distribution systems. The impact of IEC 61850 and how legacy devices can be integrated in substation automation systems were discussed. It was concluded that new SCADA systems are needed to handle new technology. Additional features like remote control, remote settings, remote disturbance records analysis and remote maintenance are also needed to properly operate the power system. The value of preventive maintenance using remote monitoring systems to determine the status of all the digital electronic devices installed in substation was also discussed. IEC 61850 offers several opportunities to improve grid operation and control. It supports interoperability between protective relays and control devices from different manufacturers in the substation, which is required in order to achieve substation level interlocking, protection and control functions and improve the efficiency of microprocessor based relays applications. This technology has now passed the initial stage of implementation and several projects are underway worldwide. 13 figs.

  17. An Integrated Refurbishment Design Process to Energy Efficiency

    NARCIS (Netherlands)

    Konstantinou, T.; Knaack, U.

    2013-01-01

    Given the very low renewal rate of the building stock, the efforts to reduce energy demand must focus on the existing residential buildings. Even though awareness has been raised, the effect on energy efficiency is often neglected during the design phase of refurbishment projects. This paper

  18. Energetic Refurbishment of Historic Brick Buildings: Problems and Opportunities

    Science.gov (United States)

    Zagorskas, Jurgis; Paliulis, Gražvydas Mykolas; Burinskienė, Marija; Venckauskaitė, Jūratė

    2013-12-01

    Building standards for energy effectiveness are increasing constantly and the market follows these changes by constructing new buildings in accordance with standards and refurbishment of the existing housing stock. Comprehensive trends in European construction market show tremendous increase in building retrofit works. It can be predicted that after the end of this decade, more than half of the construction works in European cities will be taking place in existing buildings, pushing the construction of new buildings to a less important role. Such a growth in building refurbishment works is creating a demand for suitable materials, retrofitting techniques and research. The differences between refurbishment of new-build projects and historical or valuable buildings are insufficiently recognized - mostly the buildings without further cultural preservation requirements are studied. This article covers the theme of refurbishment measures in historical buildings - the specific measures like inside insulation which are allowed due to the valuable façade or other heritage preservation requirements. An overview of other innovative methods for energy saving in existing buildings and their potential is given.

  19. Airline fuel saving through JT9D engine refurbishment

    Energy Technology Data Exchange (ETDEWEB)

    Allison, J.W.; Weisel, D.R.

    1981-01-01

    Areas are identified in the JT9D engine where the potential exists for either further performance recovery following repair, or for improved performance retention. A number of new procedures and tools which will improve performance recovery are described. Improvements in inspection techniques are discussed. Operational techniques which will improve performance retention and impact degree of refurbishment required are also presented.

  20. Analysis of Factors Influencing Building Refurbishment Project Performance

    Science.gov (United States)

    Ishak, Nurfadzillah; Aswad Ibrahim, Fazdliel; Azizi Azizan, Muhammad

    2018-03-01

    Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project's performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs) and complexity factors (CFs) during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  1. Laser ``M'egajoule'' cryogenic target program: from target fabrication to conformation of the deuterium-tritium ice layer

    Science.gov (United States)

    Collier, Rémy; Durut, Frédéric; Reneaume, Benoît; Chicane, Cédric; Théobald, Marc; Breton, Olivier; Martin, Michel; Fleury, Emmanuel; Vincent-Viry, Olivier; Bachelet, Franck; Jeannot, Laurent; Geoffray, Isabelle; Botrel, Ronan; Dauteuil, Christophe; Hermerel, Cyril; Choux, Alexandre; Bednarczyk, Sophie; Legaie, Olivier

    2008-11-01

    For the French inertial confinement fusion (ICF) experiments, cryogenic target assemblies (CTAs) for the LMJ program are manufactured and filled at CEA Valduc (Dijon) in the cryogenic targets filling station (IRCC). They will be moved at about 20 K into a transport cryostat for cryogenic targets and will be driven from CEA/Valduc to CEA/CESTA (Bordeaux). Cryogenic targets will then be transferred by several cryogenic grippers on the cryogenic target positioner before shots. The CTA has to meet severe specifications and involves a lot of challenging tasks for its manufacture. To fill CTAs by permeation with deuterium-tritium (DT), the IRCC need to meet strict thermal, mechanical and dimensional specifications. To obtain a good combustion yield, a very homogenous DT ice layer and very smooth roughness at 1.5 K below the DT triple point are also required. This paper deals with the up to date main issues in the different fields of the LMJ cryogenic target program.

  2. Embalse refurbishment - aging, safety assessment, and the path forward

    International Nuclear Information System (INIS)

    Sainz, R.; Fornero, D.; Diaz, G.; Gold, R.; Dam, R.; McCrea, L.

    2009-01-01

    The Embalse Nuclear Power Station has been engaged in Pre-refurbishment activities for two years. The primary focus has been on the first phase Pre-Project Condition Assessment Program (PCAP). This phase of the Refurbishment and Life Extension (RLE) project consists of all preparatory activities that are required to define the refurbishment scope and costs, and for input into the utility business case for the RLE project. As part of an overall Plant Life Management (PLiM) program, the following activities have been performed: 1. Systematic and rigorous condition assessments / life assessments (including Health Prognosis and Recommendations); 2. Assessment of design and safety analysis features at Embalse, relative to current technology and licensing practices; 3. Pre-Project activities related to: Retube, Steam Generator replacement, and Digital Control Computer (DCC) replacement. The program has been a joint effort of Embalse NPS-NASA, AECL, ANSALDO and several other support organizations. Details of the planned program were addressed previously in a paper presented at the 28th CNS Conference (2007), entitled 'Embalse Refurbishment - Pre-Project Condition Assessment Phase 1'. Since that time, significant progress has been made towards completing the assessment program and planning for the next steps. This paper presents the progress of Refurbishment and Life Extension (RLE) Program at Embalse Nuclear Power Station with specific emphasis on the PCAP efforts. This includes a discussion of the benefits and lessons learned from RLE project's perspective, and an overview of some key conclusions of the aging assessments. Finally, this paper outlines the path forward. It should be noted that results of assessments presented in this paper are very conservative. This is driven largely by the fact that there are currently uncertainties in equipment condition that can be addressed through the activities recommended as an outcome of these assessments. (author)

  3. Refurbishment and safety management of JMTR in extended showdown

    International Nuclear Information System (INIS)

    Ide, Hiroshi; Hori, Naohiko; Gorai, Shigeru; Kusunoki, Tsuyoshi

    2011-06-01

    Japan Materials Testing Reactor (JMTR) is a testing reactor dedicated to the irradiation tests of materials and fuels. The reactor type of the JMTR is light water moderated and cooled tank type. It achieved first criticality in 1968. Operation was started in 1970. The JMTR had been being operated for 38 years from first criticality to the JMTR No.165 cycle finished. Periodic Safety Review (PSR) was carried out with confirming the integrity inspection of the JMTR reactor facilities. And the 10 years maintenance plan was made in 2004. After that, the restart of the JMTR has been strongly requested from various users as the only irradiation testing reactor in Japan. Finally, Japan Atomic Energy Agency (JAEA) decided the refurbishment and restart of the JMTR in December 2006, and the refurbishment works was started from FY 2007. The equipment to remain in use and that which needs replacing before the restart of the JMTR was selected after having been evaluated on its damage and wear due to aging significance in safety functions, past safety-related maintenance date, and the enhancement of facility operation. The renewal work of power supply system, boiler, radioactive waste facility, etc. was already carried out as scheduled. The renewal work of reactor control system, nuclear instrumentation system and so on is being carried out. As for the safety management during reactor operation, the facility periodical own inspection and daily inspection is carried out for the purpose of maintaining soundness and reliability of facilities and equipments. And it is confirmed that the performance of facilities and equipments is maintained. As for the radiation control, irradiation dose limit determined by the law is obeyed. Based on the Concept of radiation protection of the International Commission on Radiation Protection (ICRP), reduction of dose is endeavored. The safety management during reactor shutdown is also carried out as well as it of reactor operation term. However, the

  4. Refurbishment of an Analytical Laboratory Hot Cell Facility

    International Nuclear Information System (INIS)

    Rosenberg, K.; Henslee, S.P.; Michelbacher, J.A.; Coleman, R.M.

    1997-01-01

    An Analytical Laboratory Hot Cell (ALHC) Facility at Argonne National Laboratory-West (ANL-W) was in service for nearly thirty years. In order to comply with DOE regulations governing such facilities and meet ANL-W programmatic requirements, a major refurbishment effort was undertaken. All penetrations within the facility were sealed; the ventilation system was redesigned, upgraded and replaced; the manipulators were replaced; the hot cell windows were removed, refurbished, and reinstalled; all hot cell utilities were replaced; a lead-shielded glovebox housing an Inductively Coupled Plasma - Atomic Emission Spectrometer (ICP-AES) System was interfaced with the hot cells, and a new CO2 fire suppression system and other ALHC support equipment were installed

  5. BIM applied in historical building documentation and refurbishing

    Science.gov (United States)

    Cheng, H.-M.; Yang, W.-B.; Yen, Y.-N.

    2015-08-01

    Historical building conservation raises two important issues which are documentation and refurbishing. For the recording and documentation, we already have developed 3d laser scanner and such photogrammetry technology those represent a freeze object of virtual reality by digital documentation. On the other hand, the refurbished engineering of historic building is a challenge for conservation heritage which are not only reconstructing the damage part but also restoring tangible cultural heritage. 3D digital cultural heritage models has become a topic of great interest in recent years. One reason for this is the more widespread use of laser scanning and photogrammetry for recording cultural heritage sites. These technologies have made it possible to efficiently and accurately record complex structures remotely that would not have been possible with previous survey methods. In addition to these developments, digital information systems are evolving for the presentation, analysis and archival of heritage documentation.

  6. Refurbishment of the Oregon State University rotating rack

    International Nuclear Information System (INIS)

    Higginbotham, J.F.

    1991-01-01

    TRIGA reactors have experienced operational difficulties with the rotating racks used for sample irradiation. The most common problem occurs when the rack seizes, and the corrective action taken is replacement of the rack assembly. This paper describes the symptoms leading to rack failure and a refurbishment procedure to correct the problem without replacing the rack at the Oregon State University TRIGA Reactor (OSTR) Facility. This procedure was accomplished with extraordinary results from an operational and a radiation protection standpoint. The refurbishment has extended the useful life of this reactor facility with minimal financial impact. Given the declining number of university-based research reactors, it is in the nation's best interest to maintain the currently operating research reactor facilities, and the described procedure can aid in achieving that goal

  7. Study on identification method of auto refurbishment test

    Science.gov (United States)

    Jiang, Zhenfei; Feng, Qingfu; Wang, Zhengyu; Jiang, Suqin; Chen, Xing; Zheng, Shaoyuan; Li, Bokui

    2018-04-01

    In recent years, a large number of refurbished cars inflow into the market as new cars. The traditional methods to identify refurbished cars are mostly based on experience, the subjectivity is too high and the credibility is low. In the production of automobile, the state and the automobile industry set clear standards for the thickness of the automobile paint. There is a big difference between the thickness of machine spraying and manual spraying. By studying this difference and combining with the standard, it can be identified accurately whether the car has been renovated; during the second assembly process, the surface of some parts (such as bolts) will have obvious signs of wear and tear due to the regular assembly and disassembly, it can also be identified accurately through the study of these assembly traces.

  8. EPIQR - a decision making tool for apartment building refurbishment

    Energy Technology Data Exchange (ETDEWEB)

    Caccavelli, D. [Centre Scientifique et Technique du Batiment, Cedex (France); Balaras, C. [National Observatory of Athens, Athens (Greece); Bluyssen, P. [TNO Building and Construction Research, Delft (Netherlands); Flourentzou, F. [Ecole Polytechnique Federale de Lausanne, Lausanne (France); Jaggs, M. [Building Research Establishment, Watford (United Kingdom); Wetzel, C. [Fraunhofer-Institut fur Bauphysik, Holzkirchen (Germany); Wittchen, K. [Danish Building Reasearch Institute, Hoersholm (Denmark)

    1999-11-01

    In a large majority of European countries, the amount of the maintenance and refurbishment works represents nearly 50% of the total amount spent in the building sector. New requirements are being added to the necessity of maintaining or re-establishing the building stock`s usage value. They are linked to the determination to reduce energy consumption, pollutant emissions, work site wastes, to improve the Indoor Environment Quality and all the modern conveniences inside apartment. Aware of this matter, the European Community has launched a two-year European research project, entitled EPIQR (Energy Performance, Indoor Environmental Quality, Retrofit) involving seven research institutions in the frame of the JOULE III programme. The purpose is to give architects and contracting authorities a multimedia tool to enable them to simultaneously grasp the whole process of apartment building refurbishment or retrofit. It has a number of functions: Assess the building`s degradation state based on a technical diagnosis after a standardised and complete inspection of the building; Prepare work proposals. These take into account not only the renovation of the building but also the improvement of the energy performance and IEQ; Estimate the costs corresponding to these works. A data base, containing the costs of 800 refurbishment works, provides a fast estimate of the total amount of the works being considered; Estimate the evolution of the degradation of the components if none of the works were to be carried out, as well as the refurbishment costs which would result. This paper provides an overview of the EPIQR methodology and the final deliverables of the project. (au)

  9. Refurbishment of the BNFL Magnox reprocessing plant

    International Nuclear Information System (INIS)

    Carr, V.M.; Edgar, R.

    1998-01-01

    The Magnox Reprocessing Plant was commissioned in 1964. Since then it has reprocessed more than 35,000 t of irradiated uranium metal fuel. The plant is subject to routine shutdowns to allow maintenance and project work to be undertaken. During the 1997 shutdown the opportunity was taken to replace several life limiting parts of the plant to ensure Magnox reprocessing capability well beyond the year 2010. This shutdown was the largest and most complex undertaken by Magnox Reprocessing, with a total committed value of 130 million UK pounds, 17.5 million UK pounds committed in the shutdown itself and the balance on installation, design and procurement preparing for the shutdown. The work was completed within safety targets, to programme and within budget. The lessons learned and experience gained have been fed into the methodologies and procedures for planning future project and shutdown work within BNFL. This report is part of the output from this process of continually improving performance. (author)

  10. The status of the LANSCE refurbishment project (LANSCE-R)

    International Nuclear Information System (INIS)

    Erickson, John Leonard; Jones, Kevin; Streve, Michael

    2008-01-01

    The Los Alamos Neutron Science Center (LANSCE) accelerator is an 800-MeV proton linac that drives user facilities for isotope production, proton radiography, ultra-cold neutrons, weapons neutron research and various sciences using neutron scattering. The LANSCE Refurbishment Project (LANSCE-R) is an ambitious project to refurbish key elements of the LANSCE accelerator that are becoming obsolete or nearing end-of-life. The conceptual design phase for the project is funded and underway. The 5 year, $170M (US) project will enable future decades of reliable, high-performance operation. It will replace a substantial fraction of the radio-frequency power systems (gridded tubes and klystrons) with modern systems, completely refurbish the original accelerator control and timing systems, replace obsolete diagnostic devices, and modernize other ancillary systems. An overview of the LANSCE-R project will be presented. The functional and operating requirements will be discussed, the proposed technical solutions presented, and the plan for successful project execution while meeting annual customer expectations for beam delivery will be reviewed.

  11. Inertial confinement fusion target component fabrication and technology development support: Annual report, October 1, 1993--September 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Hoppe, M. [ed.

    1995-04-01

    On December 30, 1990, the US Department of Energy entered into a contract with General Atomics (GA) to be the Inertial Confinement Fusion (ICF) Target Component Fabrication and Technology Development Support contractor. During the period, GA was assigned 17 tasks in support of the Inertial Confinement Fusion program and its laboratories. This year they achieved full production capabilities for the micromachining, dimensional characterization and gold plating of hohlraums. They fabricated and delivered 726 gold-plated mandrels of 27 different types to LLNL and 48 gold-plated mandrels of two different types to LANL. They achieved full production capabilities in composite capsule production ad delivered in excess of 240 composite capsules. They continuously work to improve performance and capabilities. They were also directed to dismantle, remove, and disposition all equipment at the previous contractor (KMSF) that had radioactive contamination levels low enough that they could be exposed to the general public without radiological constraints. GA was also directed to receive and store the tritium fill equipment. They assisted LANL in the development of techniques for characterization of opaque targets. They developed deuterated and UV-opaque polymers for use by the University of Rochester`s Laboratory for Laser Energetics (UR/LLE) and devised a triple-orifice droplet generator to demonstrate the controlled-mass nature of the microencapsulation process. The ICF program is anticipating experiments at NIF and the Omega Upgrade. Both facilities will require capsules containing layered D{sub 2} or D-T fuel. They continued engineering and assembly of equipment for a cryogenic target handling system for UR/LLE that will fill, transport, layer, and characterize targets filled with cryogenic deuterium or deuterium-tritium fuel, and insert these cryogenic targets into the OMEGA Upgrade target chamber for laser implosion experiments.

  12. Inertial confinement fusion target component fabrication and technology development support: Annual report, October 1, 1993--September 30, 1994

    International Nuclear Information System (INIS)

    Hoppe, M.

    1995-04-01

    On December 30, 1990, the US Department of Energy entered into a contract with General Atomics (GA) to be the Inertial Confinement Fusion (ICF) Target Component Fabrication and Technology Development Support contractor. During the period, GA was assigned 17 tasks in support of the Inertial Confinement Fusion program and its laboratories. This year they achieved full production capabilities for the micromachining, dimensional characterization and gold plating of hohlraums. They fabricated and delivered 726 gold-plated mandrels of 27 different types to LLNL and 48 gold-plated mandrels of two different types to LANL. They achieved full production capabilities in composite capsule production ad delivered in excess of 240 composite capsules. They continuously work to improve performance and capabilities. They were also directed to dismantle, remove, and disposition all equipment at the previous contractor (KMSF) that had radioactive contamination levels low enough that they could be exposed to the general public without radiological constraints. GA was also directed to receive and store the tritium fill equipment. They assisted LANL in the development of techniques for characterization of opaque targets. They developed deuterated and UV-opaque polymers for use by the University of Rochester's Laboratory for Laser Energetics (UR/LLE) and devised a triple-orifice droplet generator to demonstrate the controlled-mass nature of the microencapsulation process. The ICF program is anticipating experiments at NIF and the Omega Upgrade. Both facilities will require capsules containing layered D 2 or D-T fuel. They continued engineering and assembly of equipment for a cryogenic target handling system for UR/LLE that will fill, transport, layer, and characterize targets filled with cryogenic deuterium or deuterium-tritium fuel, and insert these cryogenic targets into the OMEGA Upgrade target chamber for laser implosion experiments

  13. Inertial confinement fusion target component fabrication and technology development support. Annual report, October 1, 1994--September 30, 1995

    International Nuclear Information System (INIS)

    Hoppe, M.

    1996-05-01

    On December 30, 1990, the US Department of Energy entered into a contract with General Atomics (GA) to be the Inertial Confinement Fusion (ICF) Target Component Fabrication and Technology Development Support contractor. This report documents the technical activities of the period October 1, 1994 through September 30, 1995. During this period, GA was assigned 15 tasks in support of the Inertial Confinement Fusion program and its laboratories. A portion of the effort on these tasks included providing direct ''Onsite Support'' at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), and Sandia National Laboratory Albuquerque (SNLA). The ICF program is anticipating experiments at the National Ignition Facility (NIF) and the OMEGA Upgrade. Both facilities will require capsules containing layered D 2 or deuterium-tritium (D-T) fuel. The authors are part of the National Cryogenic Target Program to create and demonstrate viable ways to generate and characterize cryogenic layers. Progress has been made on ways to both create viable layers and to characterize them. They continued engineering, assembly and testing of equipment for a cryogenic target handling system for University of Rochester's Laboratory for Laser Energetics (UR/LLE) that will fill, transport, layer, and characterize targets filled with cryogenic fuel, and insert these cryogenic targets into the OMEGA Upgrade target chamber for laser implosion experiments. This report summarizes and documents the technical progress made on these tasks

  14. Inertial confinement fusion target component fabrication and technology development support. Annual report, October 1, 1994--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Hoppe, M. [ed.

    1996-05-01

    On December 30, 1990, the US Department of Energy entered into a contract with General Atomics (GA) to be the Inertial Confinement Fusion (ICF) Target Component Fabrication and Technology Development Support contractor. This report documents the technical activities of the period October 1, 1994 through September 30, 1995. During this period, GA was assigned 15 tasks in support of the Inertial Confinement Fusion program and its laboratories. A portion of the effort on these tasks included providing direct ``Onsite Support`` at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), and Sandia National Laboratory Albuquerque (SNLA). The ICF program is anticipating experiments at the National Ignition Facility (NIF) and the OMEGA Upgrade. Both facilities will require capsules containing layered D{sub 2} or deuterium-tritium (D-T) fuel. The authors are part of the National Cryogenic Target Program to create and demonstrate viable ways to generate and characterize cryogenic layers. Progress has been made on ways to both create viable layers and to characterize them. They continued engineering, assembly and testing of equipment for a cryogenic target handling system for University of Rochester`s Laboratory for Laser Energetics (UR/LLE) that will fill, transport, layer, and characterize targets filled with cryogenic fuel, and insert these cryogenic targets into the OMEGA Upgrade target chamber for laser implosion experiments. This report summarizes and documents the technical progress made on these tasks.

  15. Fabrication of 121Sb isotopic targets for the study of nuclear high spin features

    Science.gov (United States)

    Devi, K. Rojeeta; Kumar, Suresh; Kumar, Neeraj; Abhilash, S. R.; Kabiraj, D.

    2018-06-01

    Isotopic 121Sb targets with 197Au backing have been prepared by Physical Vapor Deposition (PVD) method using the diffusion pump based coating unit at target laboratory, Inter University Accelerator Centre (IUAC), New Delhi, India. The target thickness was measured by stylus profilo-meter and the purity of the targets was investigated by Energy Dispersive X-ray Analysis (EDXA). One of these targets has been used in an experiment which was performed at IUAC for nuclear structure study through fusion evaporation reaction. The excitation function of the 121Sb(12C, yxnγ) reaction has been performed for energies 58 to 70 MeV in steps of 4 MeV. The experimental results were compared with the calculations of statistical models : PACE4 and CASCADE. The methods adopted to achieve best quality foils and good deposition efficiency are reported in this paper.

  16. Design and fabrication of a CH/Al dual-layer perturbation target for hydrodynamic instability experiments in ICF

    Energy Technology Data Exchange (ETDEWEB)

    Tang, Jun [Shanghai Key Laboratory of Special Artificial Microstructure Materials and Technology, School of Physics Science and Engineering, Tongji University, Shanghai 200092 (China); Xie, Zhiyong [Shanghai Institute of Laser Plasma, Shanghai 201800 (China); Du, Ai [Shanghai Key Laboratory of Special Artificial Microstructure Materials and Technology, School of Physics Science and Engineering, Tongji University, Shanghai 200092 (China); Ye, Junjian [Shanghai Institute of Laser Plasma, Shanghai 201800 (China); Zhang, Zhihua; Shen, Jun [Shanghai Key Laboratory of Special Artificial Microstructure Materials and Technology, School of Physics Science and Engineering, Tongji University, Shanghai 200092 (China); Zhou, Bin, E-mail: zhoubin863@tongji.edu.cn [Shanghai Key Laboratory of Special Artificial Microstructure Materials and Technology, School of Physics Science and Engineering, Tongji University, Shanghai 200092 (China)

    2014-04-15

    Highlights: • Sinusoidal perturbed Al foil was prepared by single-point diamond turning. • Perturbed Al foil was measured by surface profiler and white light interferometer. • Perturbed Al foil and CH layer adhered with each other via a hot-press process. • Parameters and cross-section of the CH–Al perturbation target was characterized. - Abstract: A polystyrene (CH)/aluminum (Al) dual-layer perturbation target for hydrodynamic instability experiments in inertial confinement fusion (ICF) was designed and fabricated. The target was composed of a perturbed 40 μm Al foil and a CH layer. The detailed fabrication method consisted of four steps. The 40 μm Al foil was first prepared by roll and polish process; the perturbation patterns were then introduced on the surface of the Al foil by the single-point diamond turning (SPDT) technology; the CH layer was prepared via a simple method which called spin-coating process; finally, the CH layer was directly coated on the perturbation surface of Al foil by a hot-press process to avoid the use of a sticker and to eliminate the gaps between the CH layer and the Al foil. The parameters of the target, such as the perturbation wavelength (T) and perturbation amplitude (A), were characterized by a QC-5000 tool microscope, an alpha-step 500 surface profiler and a NT1100 white light interferometer. The results showed that T and A of the target were about 52 μm and 7.34 μm, respectively. Thickness of the Al foil (H1), thickness of the CH layer (H2), and cross-section of the dual-layer target were characterized by a QC-5000 tool microscope and a scanning electron microscope (SEM). H1 and H2 were about 40 μm and 15 μm, respectively, the cross-sectional photographs of the target showed that the CH layer and the Al foil adhered perfectly with each other.

  17. Fabrication of thin-wall, freestanding inertial confinement fusion targets by chemical vapor deposition

    International Nuclear Information System (INIS)

    Carroll, D.W.; McCreary, W.J.

    1982-01-01

    To meet the requirements for plasma physics experiments in the inertial confinement fusion (ICF) program, chemical vapor deposition (CVD) in fluid beds was used to fabricate freestanding tungsten spheres and cylinders with wall thicknesses less than 5.0 μm. Molybdenum and molybdenum alloy (TZM) mandrels of the desired geometry were suspended in a carrier bed of dense microspheres contained in an induction-heated fluid-bed reactor. The mandrels were free to float randomly through the bed, and using the reaction WF 6 +3H 2 →/sub /KW +6HF, very fine-grained tungsten was deposited onto the surface at a rate and in a grain size determined by temperature, gas flow rate, system pressure, and duration of the reaction. After coating, a portion of each mandrel was exposed by hole drilling or grinding. The mandrel was then removed by acid leaching, leaving a freestanding tungsten shape. Experimental procedures, mandrel preparation, and results obtained are discussed

  18. Overview on the target fabrication facilities at ELI-NP and ongoing strategies

    Science.gov (United States)

    Gheorghiu, C. C.; Leca, V.; Popa, D.; Cernaianu, M. O.; Stutman, D.

    2016-10-01

    Along with the development of petawatt class laser systems, the interaction between high power lasers and matter flourished an extensive research, with high-interest applications like: laser nuclear physics, proton radiography or cancer therapy. The new ELI-NP (Extreme Light Infrastructure - Nuclear Physics) petawatt laser facility, with 10PW and ~ 1023W/cm2 beam intensity, is one of the innovative projects that will provide novel research of fundamental processes during light-matter interaction. As part of the ELI-NP facility, Targets Laboratory will provide the means for in-house manufacturing and characterization of the required targets (mainly solid ones) for the experiments, in addition to the research activity carried out in order to develop novel target designs with improved performances. A description of the Targets Laboratory with the main pieces of equipment and their specifications are presented. Moreover, in view of the latest progress in the target design, one of the proposed strategies for the forthcoming experiments at ELI-NP is also described, namely: ultra-thin patterned foil of diamond-like carbon (DLC) coated with a carbon-based ultra-low density layer. The carbon foam which behaves as a near-critical density plasma, will allow the controlled-shaping of the laser pulse before the main interaction with the solid foil. Particular emphasis will be directed towards the target's design optimization, by simulation tests and tuning the key-properties (thickness/length, spacing, density foam, depth, periodicity etc.) which are expected to have a crucial effect on the laser-matter interaction process.

  19. Was It Really Worth Pain? Refurbishment of Mercedes-Benz Trucks by Botswana Defence Force

    National Research Council Canada - National Science Library

    Rangobana, Samuel A; Alkebaisi, Hussain K

    2005-01-01

    .... Logistics statistics, for refurbished trucks returned to user units, are also gathered from the asset management software database, Mincom Ellipse, in use by the Botswana Defence Force Mechanical...

  20. Extended layup of steam generators during a refurbishment outage

    International Nuclear Information System (INIS)

    Marks, C.R.; Little, M.D.; Slade, J.; Gendron, T.

    2009-01-01

    In May 2008, Point Lepreau Generating Station (PLGS), owned and operated by New Brunswick Power Nuclear (NBPN), entered an extended refurbishment outage initially expected to last approximately 18 months. NBPN had the two inter-related goals with respect to layup of the steam generators during this period: equipment preservation and inspection interval modification. The steam generators were to be preserved such that there was no loss of operating life due to corrosion of either the tubing (Alloy 800NG) or other internal components (with carbon steel being the limiting material with respect to corrosion). Additionally, NBPN desired that the time in layup not count as operating time in setting the schedule for future inspections. That is, a key goal of the steam generator layup is that the future inspection interval be based on operating time, not calendar time. The NBPN approach consists of the following four steps: A review of industry operating experience with long outages (including both PWRs and PHWRs); The development of technically based layup strategies and procedures; A mid-outage review of the implementation of the layup strategies and procedures; and A post-outage review to determine if the actual conditions in the steam generators will support modification of the inspection interval. This paper discusses the results of the first three of these steps. At this time, the plant is still in the refurbishment outage. Throughout the outage evaluation process, the following issues have been the main focus of the reviews: The potential for degradation (pitting and cracking) of steam generator tubes; The potential for general corrosion of carbon and low alloy steel internals; Oxidation of deposits (which could subsequently lead to oxidizing conditions during operation, possibly leading to tube degradation). This paper discusses the industry operating experience reviewed, the pre-outage assessments, and the mid-outage assessments. Current outage planning places the

  1. The probability safety assessment impact on the BR2 refurbishment

    International Nuclear Information System (INIS)

    Pouleur, Yvan

    1995-01-01

    The probabilistic safety assessment (PSA) study has proven its worth by establishing a sensitive safety screening of the reactor. It has focused engineering forces to technically improve safety systems and to measure the influence of functional modifications. In the future, the project will be developed in a living way, to reinforce the present structure along with continuous safety monitoring of the reactor and to develop engineers and operators safety skills. This paper presents the PSA impact on the BR2 (Belgian Reactor Two) refurbishment. (author)

  2. Industry partnership: adding value to nuclear refurbishment and maintenance

    International Nuclear Information System (INIS)

    Gibbins, T.; Bains, N.; Morikawa, D.

    2008-01-01

    The Point Lepreau Generating Station was the first CANDU 6 unit to be licensed for operation, beginning commercial operation in 1983. It is now become the first CANDU 6 to undergo full refurbishment. As part of the overall project, all 380 fuel channels and associated feeders will be removed and replaced. In order to undertake this project, it was necessary for AECL to design and develop over fifty 'first-of-a-kind tools' for fuel channel and calandria tube replacement. This paper outlines the complexity of the retube tooling project and the industry partnership strategy for the engineered tooling systems development. (author)

  3. Interaction of a laser beam with a target. Application to the fabrication of granular superconducting films

    International Nuclear Information System (INIS)

    Desserre, Jacques.

    1974-01-01

    The aim was to prepare a superconductor of high T(c). First are given the different simplified theories (BCS, Mac Millan) whereby the critical temperature of a superconductor can be calculated, with a view to its optimization. A material and a preparation technique were chosen on the basis of these theories. The method uses phenomena which occur during the interaction of a coherent pulsed light beam, emitted by a laser, with the surface of a metallic or nonmetallic target. Different theoretical models of this interaction are proposed. Special attention is paid to complex targets (alloys, compounds) and the construction of a model describing the vaporization of a compound is suggested. By a suitable choice of laser, based on the energy emission profile and the value of the energy supplied, congruent vaporization of the target is possible. The technique was applied to the preparation of thin layers by condensation onto a substrate of the vapor and the plasma emitted during the interaction. The deposits generally have the same structure as the bulk compound used as target while the atomic composition of the film may be slightly different. Thin layers of Ni 3 Mn, CdTe, ZnC, HfC were prepared in this way without treatment of the deposits after condensation. Simultaneous vaporization of the compound ReBe 22 in the bulk state gave filaments made up of small grains (20A), identical in composition with the target. The beryllium α phase (compact hexagonal) was identified but the electron diffraction study showed the existence of several other phases of unknown structure. The superconducting properties changed with time [fr

  4. Fabrication and characterisation of composite targets for the transmutation of actinides

    International Nuclear Information System (INIS)

    Naestren, C.; Haas, D.; Fernandez, A.; Somers, J.

    2006-01-01

    Transmutation of transuranic elements separated from spent fuel is a way to reduce the toxicity of long-lived nuclides in the waste before disposal. Plutonium and the minor actinides (MA) are reintroduced into the fuel cycle for further irradiation and incineration. Currently CERMET fuel forms, in which a ceramic actinide is dispersed in a matrix, are considered for MA transmutation. In a first step, PuO 2 beads are produced by a sol gel method in which a Pu nitrate solution is converted to solid, dust-free, particles. These porous beads are then infiltrated with an americium nitrate solution to the incipient wetness point and calcined to give the (PuAm)O 2 beads, which are blended with a metal matrix and compacted and sintered to form the final fuel pellet. The matrix used is molybdenum due to its high thermal conductivity and low neutron capture cross section, if it is enriched in 92 Mo. In this work, optimization of the bead porosity is investigated to achieve a higher Am content by infiltration. Addition of carbon to the mother solution in the sol gel step increases the bead porosity but it also changes both bead and final fuel pellet microstructure. A surrogate fuel, with cerium simulating the actinides has been fabricated and its mechanical stability and bead characteristics investigated as a function of carbon content and thermal treatment. The characterization of the surrogate fuel by ceramography, density, porosity, bead-quality, etc., is a necessary step in the process optimization, to be transferred to the production of the actinide samples. This process is now at an advanced stage and is being used for the production of fuels for irradiation tests in the Phenix (Futurix) and HFR-Petten (HELIOS) reactors. In parallel, studies on the dissolution of the fuel pellets, with the aim of dissolving the Mo-matrix while keeping the CeO 2 beads intact, have been initiated. Thus, Mo can be recycled for further fuel fabrication either from production scraps or from

  5. Production and characterization of thin 7Li targets fabricated by ion implantation

    International Nuclear Information System (INIS)

    Cruz, J.; Fonseca, M.; Luis, H.; Mateus, R.; Marques, H.; Jesus, A.P.; Ribeiro, J.P.; Teodoro, O.M.N.D.; Rolfs, C.

    2009-01-01

    Very high fluence implantation of 7 Li + ions was used to promote the formation of a thin and high density 7 Li target in the surface region of Al samples. The implanted volume was characterized by particle induced gamma-ray emission, Rutherford backscattering spectrometry, X-ray photoelectron spectroscopy and nuclear reaction analysis, revealing that the implanted surface is a combination of Li 2 CO 3 , metallic lithium, LiOH and C, with almost no Al present. Radiation damage effects by proton beams were studied by observing the evolution of the 7 Li(p, α) 4 He nuclear reaction yield with the accumulated charge, at different proton energies, revealing high stability of the produced Li target.

  6. Refurbishment of the IEAR1 primary coolant system piping supports

    International Nuclear Information System (INIS)

    Fainer, Gerson; Faloppa, Altair A.; Oliveira, Carlos A. de; Mattar Neto, Miguel

    2015-01-01

    A partial replacement of the IEA-R1 piping system was concluded in 2014. This paper presents the study and the structural analysis of the IEA-R1 primary circuit piping supports, considering all the changes involved in the replacement. The IEA-R1 is a nuclear reactor for research purposes designed by Babcox-Willcox that is operated by IPEN since 1957. The reactor life management and modernization program is being conducted for the last two decades and already resulted in a series of changes, especially on the reactor coolant system. This set of components, divided in primary and secondary circuit, is responsible for the circulation of water into the core to remove heat. In the ageing management program that includes regular inspection, some degradation was observed in the primary piping system. As result, the renewing of the piping system was conducted in 2014. Moreover the poor condition of some original piping supports gave rise to the refurbishment of all piping supports. The aim of the present work is to review the design of the primary system piping supports taking into account the current conditions after the changes and refurbishment. (author)

  7. Fabrication of genetically engineered polypeptide@quantum dots hybrid nanogels for targeted imaging

    Science.gov (United States)

    Yang, Jie; Yao, Ming-Hao; Zhao, Dong-Hui; Zhang, Xiao-Shuai; Jin, Rui-Mei; Zhao, Yuan-Di; Liu, Bo

    2017-08-01

    Nanogels have been widely used as multifunctional drug delivery carriers because of high water content, biocompatibility, and high loading capability. We designed and biosynthesized two triblock artificial polypeptides PC10A and PC10ARGD as vehicles for encapsulating hydrophobic materials. These polypeptides can form nanogels by self-assembly when the concentration is below 2% ( w/ v). The physical properties of nanogels, including size, surface potential, and targeting domain, are able to be tuned. Hydrophobic materials from molecular size to nano-size can be loaded into the polypeptide nanogels to form hybrid nanogels. Hydrophobic quantum dots CdSe@ZnS below 10 nM were loaded into the polypeptide nanogels by ultrasonic treatment. Encapsulation endows hydrophobic QDs with good tunability of size, water solubility, stability, targeting, and biocompatibility. PC10ARGD nanogels and PC10ARGD@QDs hybrid nanogels showed excellent biocompatibility, which the cellular viabilities of HeLa and MCF-7 cells treated with 1% PC10ARGD nanogels and PC10ARGD@QDs hybrid nanogels contained 20 nM QDs were above 90 and 80%, respectively. PC10ARGD@QDs hybrid nanogels with an arginine-glycine-aspartic acid motif present efficient receptor-mediated endocytosis in α v β 3 overexpressing HeLa cells but not in the control MCF-7 cells as analyzed by confocal microscopy. These results demonstrate that such polypeptide nanogels as nanocarriers are expected to have great potential applications in biomedicine.

  8. Fabrication and evaluation of tumor-targeted positive MRI contrast agent based on ultrasmall MnO nanoparticles.

    Science.gov (United States)

    Huang, Haitao; Yue, Tao; Xu, Ke; Golzarian, Jafar; Yu, Jiahui; Huang, Jin

    2015-07-01

    Gd(III) chelate is currently used as positive magnetic resonance imaging (MRI) contrast agent in clinical diagnosis, but generally induces the risk of nephrogenic systemic fibrosis (NSF) due to the dissociated Gd(3+) from Gd(III) chelates. To develop a novel positive MRI contrast agent with low toxicity and high sensitivity, ultrasmall MnO nanoparticles were PEGylated via catechol-Mn chelation and conjugated with cRGD as active targeting function to tumor. Particularly, the MnO nanoparticles with a size of ca. 5nm were modified by α,β-poly(aspartic acid)-based graft polymer containing PEG and DOPA moieties and, meanwhile, conjugated with cRGD to produce the contrast agent with a size of ca. 100nm and a longitudinal relaxivity (r1) of 10.2mM(-1)S(-1). Such nanoscaled contrast agent integrated passive- and active-targeting function to tumor, and its efficient accumulation behavior in tumor was verified by in vivo distribution study. At the same time, the PEG moiety played a role of hydrophilic coating to improve the biocompatibility and stability under storing and physiological conditions, and especially might guarantee enough circulation time in blood. Moreover, in vivo MRI revealed a good and long-term effect of enhancing MRI signal for as-fabricated contrast agent while cell viability assay proved its acceptable cytotoxicity for MRI application. On the whole, the as-fabricated PEGylated and cRGD-functionalized contrast agent based on ultrasmall MnO nanoparticles showed a great potential to the T1-weighted MRI diagnosis of tumor. Crown Copyright © 2015. Published by Elsevier B.V. All rights reserved.

  9. Theoretical and numerical analysis of auxiliary heating for cryogenic target fabrication

    International Nuclear Information System (INIS)

    Yang Xiaohu; Tian Chenglin; Yin Yan; Xu Han; Zhuo Hongbin

    2008-01-01

    In order to compensate for the nonspherical-symmetric heat flux in the hohlraum, auxiliary heating is usually applied to the outside wall of the hohlraum during the cooling process. A one-dimensional heat exchange theoretical model has been proposed in the indirect-drive target, to analyze the required auxiliary heat flux. With a two dimensional axisymmetric model, the auxiliary heating mechanism has been simulated by FLUENT code. The optimum heat flux which is 635 W/m 2 has been obtained as the heaters around the outside of the hohlraum about 1.3 mm above and below the mid-plane. The result is in good agreement with the theoretical model. (authors)

  10. Fabrication of self supporting metallic rare earth targets using a piezo-electric quartz as substrate

    International Nuclear Information System (INIS)

    Bonetti, C.P.

    1975-01-01

    Metallic self-supporting targets of cerium and praseodymium of 1 to 2.5mg/cm 2 on a diameter of 18mm were made using the process of evaporation by electron bombardment. Materials are placed on a piezo-electric quartz which permits the direct and precise measurement of the mass of the deposit. Then, such a deposit must be removed and placed on a frame in an environment of argon gas. This method is important because it can be used for small quantities of materials (case of separated isotopes). These high purity foils are used for the study of (d,n) reactions with the Tandem Van de Graaff Accelerator [fr

  11. Refurbishment of PSI-Hotlaboratory to comply with requested safety standards after 40 years of operation

    International Nuclear Information System (INIS)

    Bart, G.; Hofer, R.; Wiezel, L.

    2001-01-01

    The PSI Hotlaboratory has started its operation in 1962. From the very beginning the hotcell wing served for handling and gross PIE analysis of reactor core internals and highly active material from accelerator target stations. In the radiochemistry wing micro structural and chemical analyses of small, highly active samples were subsequently performed with equipment installed in individual lead shielded cells. The radiochemistry wing also served for radiopharmaceutical nuclide dispatching and actinide ceramics preparation. Several constructions and building enlargements have been added since 1962 and similarly, the safety infrastructure was improved case wise. In the course of reevaluating the principal safety documentation for the Hotlaboratory, during 1994-95 it was realized that the building concept with its class A radioactive areas did not comply any more with modern safely standards, in particular with fire protection regulations and operator safety. In accident scenario analyses it was further demonstrated that radio nuclide release to the environment could cause intolerable health risks to the surrounding population. It was therefore decided to principally refurbish the building infrastructure particularly with respect to fire protection, media, and laboratory instrumentation and control. The chosen concept consists in adding a so called media installation corridor on top and along the radiochemistry wing from which the individual labs, on two floors are reached by vertical media access channels. Since the reconstruction outage time had to be minimized and there was not enough storage capacity to remove the whole Hotlaboratory equipment at once, a stepwise reconstruction was planned with separation of specified blocks of labs which are freed from samples (but still contain specially encapsulated, internally contaminated glove boxes and lead shielded cells) and which are accessed from the building outside, while the rest of the labs are still (or again) in

  12. An Effort to Improve Uranium Foil Target Fabrication Technology by Single Roll Method

    Energy Technology Data Exchange (ETDEWEB)

    Sim, Moon Soo; Lee, Jong Hyeon [Chungnam National University, Daejeon (Korea, Republic of); Kim, Chang Kyu [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-05-15

    Technetium-99({sup 99m}Tc) is the most commonly used radioisotope in nuclear medicine for diagnostic procedures. It is produced from the decay of its parent Mo-99, which is sent to the hospital or clinic in the form of a generator. Recently, all of the major providers of Mo-99 have used high-enrichment uranium (HEU) as a target material in a research and test reactor. As a part of a nonproliferation effort, the RERTR program has investigated the production of the fission isotope Mo-99 using low-enrichment uranium(LEU) instead of HEU since 1993, a parent nuclide of {sup 99m}Tc , which is a major isotope for a medical diagnosis. As uranium foils have been produced by the conventional method on a laboratory scale by a repetitive hot-rolling method with significant problems in foil quality, productivity and economic efficiency, attention has shifted to the planar flow casting(PFC) method. In KAERI, many experiments are performed using depleted uranium(DU).

  13. Refurbishment and extension of the terrace of Restaurant No.1

    CERN Multimedia

    2009-01-01

    Work to refurbish and extend part of the terrace of Restaurant No.1 started in the first week of October and should last about two months. This is just a small part of the wide-ranging site infrastructure consolidation programme that began in April 2009. The new terrace, covering a surface area of 1770 m2 (compared with 1650 m2 today), is scheduled to be completed by the end of 2010 and will run all the way around the Restaurant No.1 extension. Work on the latter will affect part of Building 501 during the period from April to October 2010. The new dining room will seat some 275 additional customers (see picture). Part of the Cedars car-park will remain closed until some time in December to provide site access for trucks transporting construction materials, plant, etc. CERN Bulletin

  14. Inertial confinement fusion target component fabrication and technology development support. Annual report 10/1/98 through 9/30/99

    International Nuclear Information System (INIS)

    Gibson, Jane

    1999-01-01

    General Atomics (GA) has served as the Inertial Confinement Fusion (ICF) Target Component Fabrication and Technology Development Support contractor for the U.S. Department of Energy since December 30, 1990. This report documents the technical activities of the period October 1, 1998 through September 30, 1999. During this period, GA and our partner Schafer Corporation were assigned 17 formal tasks in support of the ICF program and its five laboratories. A portion of the effort on these tasks included providing direct ''Onsite Support'' at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), and Sandia National Laboratory (SNL). We fabricated and delivered over 1790 hohlraum mandrels and numerous other micromachined components to LLNL, LANL, and SNL. We produced more than 1380 glass and plastic target capsules over a wide range of sizes and designs (plus over 300 near target-quality capsules) for LLNL, LANL, SNL, and University of Rochester/Laboratory for Laser Energetic (UR/LLE). We also delivered various target foils and films for Naval Research Lab (NRL) and UWLLE in FY99. We fabricated a device to polish NIF-sized beryllium shells and prepared a laboratory for the safe operation of beryllium polishing activities. This report describes these target fabrication activities and the target fabrication and characterization development activities that made the deliveries possible. During FY99, the GA/Schafer portion of the GA/Schafer-UR/LLE-LANL team effort for design, procurement, installation, and testing of the OMEGA Cryogenic Target System (OCTS) that will field cryogenic targets on OMEGA was completed. All components of the OCTS were procured, fabricated, assembled, tested, and shipped to UR/LLE. Only minor documentation tasks remain to be done in FY00. The ICF program is anticipating experiments at the OMEGA laser and the National Ignition Facility (NIF) which will require targets containing cryogenic layered D2 or deuterium

  15. Fuel management during Cirus refurbishing and re-commissioning

    International Nuclear Information System (INIS)

    Rai, K.K.; Srivastava, Alok; Ramesh, N.; Sharma, R.C.

    2006-01-01

    Cirus is a Heavy water moderated and Demineralised water cooled 40 MW(th) research reactor. Graphite is used as reflector. Natural uranium in metallic form and clad in aluminium is used as fuel. After over three decades of operation, signs of ageing started surfacing up. Refurbishment plan was drawn up based upon ageing studies and performance review. Core unloading was the foremost requirement for jobs like assessment of integrity of primary coolant underground pipelines. Refuelling is carried out during reactor shut down with primary coolant pumps in operation. During the fuel unloading with the gradual removal of assemblies, reduction in the gross flow of primary coolant was also envisaged. The scheme for core unloading was formulated with emphasis on optimization of fuel utilization, cooling to the fuel assemblies during transit and overall safety of equipment and personnel. After completion of refurbishing jobs, it was decided to install dummy assemblies in pile to facilitate commissioning of primary coolant system. A lot of difficulty was faced due to release of iron oxide flakes from the surface of primary coolant pipelines. The inlet feeders, valves and dummy assemblies had to be periodically flushed to get rid of iron oxide flakes deposited during the period. Various efforts made to get rid of iron oxide flakes included increasing the velocity by bypassing the core, installation of hollow dummy assemblies and installation of strainer at core inlet. The decision of fuel loading was made based upon the experience feedback with dummy assemblies and assessment of the pattern of release of iron oxide flakes. The dummy assemblies were replaced with uranium fuel assemblies. Fuelling work was carried out with Reactor hall crane with additional precautions. This paper describes the experience with handling of irradiated fuel assemblies to facilitate core unloading, experience with dummy assemblies and loading of fuel into the core and subsequent performance

  16. Synthesis of the studies on fuels and transmutation targets (fabrication, design, irradiation damage and dissolution) realized in the framework of the Bataille law

    International Nuclear Information System (INIS)

    Pillon, S.

    2004-12-01

    This document presents the different studied fuels and targets for the transmutation of the minor actinides and of the long life fission products for PWR/EPR and Fast neutron Reactor/EFR of today technology; the results of studies on the behavior under ions irradiation and in experimental nuclear reactor; the knowledge in terms of design, simulation and sizing; the development in terms of fabrication; the knowledge on the dissolution aptitude of these fuels and targets. (A.L.B.)

  17. Structure and properties of nanoparticles fabricated by laser ablation of Zn metal targets in water and ethanol

    Science.gov (United States)

    Svetlichnyi, V. A.; Lapin, I. N.

    2013-10-01

    Size characteristics, structure, and spectral and luminescent properties of nanoparticles fabricated by laser ablation of zinc metal targets in water and ethanol are experimentally investigated upon excitation by Nd:YAG-laser radiation (1064 nm, 7 ns, and 15 Hz). It is demonstrated that zinc oxide nanoparticles with average sizes of 10 nm (in water) and 16 nm (in ethanol) are formed in the initial stage as a result of ablation. The kinetics of the absorption and luminescence spectra, transmission electron microscopy, and x-ray structural analysis demonstrate that during long storage of water dispersions and their drying, nanoparticles efficiently interact with carbon dioxide gas of air that leads to the formation of water-soluble Zn(CO3)2(OH)6. In ethanol, Zn oxidation leads to the formation of stable dispersions of ZnO nanoparticles with 99% of the wurtzite phase; in this case, the fluorescence spectra of ZnO nanoparticles change with time, shifting toward longer wavelength region from 550 to 620 nm, which is caused by the changed nature of defects.

  18. Fabrication of aerogel capsule, bromine-doped capsule, and modified gold cone in modified target for the Fast Ignition Realization Experiment (FIREX) Project

    Science.gov (United States)

    Nagai, Keiji; Yang, H.; Norimatsu, T.; Azechi, H.; Belkada, F.; Fujimoto, Y.; Fujimura, T.; Fujioka, K.; Fujioka, S.; Homma, H.; Ito, F.; Iwamoto, A.; Jitsuno, T.; Kaneyasu, Y.; Nakai, M.; Nemoto, N.; Saika, H.; Shimoyama, T.; Suzuki, Y.; Yamanaka, K.; Mima, K.

    2009-09-01

    The development of target fabrication for the Fast Ignition Realization EXperiment (FIREX) Project is described in this paper. For the first stage of the FIREX Project (FIREX-I), the previously designed target has been modified by using a bromine-doped ablator and coating the inner gold cone with a low-density material. A high-quality bromine-doped capsule without vacuoles was fabricated from bromine-doped deuterated polystyrene. The gold surface was coated with a low-density material by electrochemical plating. For the cryogenic fuel target, a brand new type of aerogel material, phloroglucinol/formaldehyde (PF), was investigated and encapsulated to meet the specifications of 500 µm diameter and 20 µm thickness, with 30 nm nanopores. Polystyrene-based low-density materials were investigated and the relationship between the crosslinker content and the nanopore structure was observed.

  19. Ongoing refurbishment activities and strategy for the future operation of the BR2 reactor

    International Nuclear Information System (INIS)

    Koonen, E.; Gubel, P.

    1994-01-01

    The operation of the BR2 reactor with its second Be-matrix is foreseen up to mid-1995 or mid-1996. A life extension for another 15 years is envisaged considering programmatic, financial and technical aspects. At present, the second phase of the refurbishment programme is being executed. The major activities of this programme can be grouped under two headings: safety reassessment and ageing issues. The expected outcome end '93 is an assessment report defining extent, choosen options, prioritized activities, budget and a tentative planning for the preparation and execution of the refurbishment. These aspects together with the prospects of possible cooperation with other parties for the refurbishment programme and the future operation of BR2 will be evaluated by the CEN/SCK Board who has to take a decision early in 1994. Various scenarios are now being considered and evaluated for the refurbishment and the future BR2 operation regime. (author)

  20. Ongoing refurbishment activities and strategy for the future operation of the BR2 reactor

    Energy Technology Data Exchange (ETDEWEB)

    Koonen, E; Gubel, P [BR2 Department, Belgian Nuclear Research Center, CEN/SCK, Mol (Belgium)

    1993-07-01

    The operation of the BR2 reactor with its second Be-matrix is foreseen up to mid-1995 or mid-1996. A life extension for another 15 years is envisaged considering programmatic, financial and technical aspects. At present, the second phase of the refurbishment programme is being executed. The major activities of this programme can be grouped under two headings: safety reassessment and ageing issues. The expected outcome end '93 is an assessment report defining extent, choosen options, prioritized activities, budget and a tentative planning for the preparation and execution of the refurbishment. These aspects together with the prospects of possible cooperation with other parties for the refurbishment programme and the future operation of BR2 will be evaluated by the CEN/SCK Board who has to take a decision early in 1994. Various scenarios are now being considered and evaluated for the refurbishment and the future BR2 operation regime. (author)

  1. The BR2 refurbishment programme: achievements and two years operation feedback

    International Nuclear Information System (INIS)

    Gubel, P.; Dekeyser, J.; Koonen, E.; Van der Auwera, J.

    1999-01-01

    The BR2 reactor was shutdown end of June 1995 for an extensive refurbishment after more than 30 years utilization. The beryllium matrix needed to be replaced and the aluminium vessel inspected for an envisaged 15 year life extension. Other aspects of the refurbishment programme aimed at the reliability and availability of the installations, safety of operation and compliance with modern safety standards. The reactor was started again in' April '97 and operated only for three cycles in 1997. These first irradiation cycles were intended as a demonstration of the safety and reliability of all components and systems after refurbishment. Also during the extended shutdowns non-critical refurbishment tasks were allowed to be continued and finalized. At the request of the Safety Authorities, some modifications and studies are still in progress without perturbation of the reactor operation. (author)

  2. The influences of attributes, skills and knowledge of managers on refurbishment project performance

    Science.gov (United States)

    Ishak, Nurfadzillah

    2018-02-01

    Recently, the momentum on the growth of national building industry shows the increasing of the demand in refurbishment works becomes a trend spreading over the Malaysia. However, the potential of these activities normally related with the complexity in technical aspect compared to new build schemes. It will be reflecting on the unsatisfactory project performance. A competent manager is required to have the appropriate attributes, skills and knowledge in able to perform all the duties associated with managing the refurbishment building projects. Therefore, this paper is to identify the most appropriate attributes, skills and knowledge that required for managers to indicate the relationship between the influences on the refurbishment projects performance. This finding is indicate the importance of development the personal attributes, skills, and knowledge of managers and adds as benefit of raising the profile and image of managers in refurbishment building industry through a dissemination of the findings.

  3. Ongoing refurbishment activities and strategy for the future operation of the BR2 reactor

    International Nuclear Information System (INIS)

    Koonen, E.; Gubel, P.

    1993-01-01

    The operation of the BR2 reactor with its second Be-matrix is foreseen up to mid-1995 or mid-1996. A life extension for another 15 years is envisaged considering programmatic, financial and technical aspects. At present, the second phase of the refurbishment programme is being executed. The major activities of this programme can be grouped under two headings: safety reassessment and ageing issues. The expected outcome end '93 is an assessment report defining extent, choosen options, prioritized activities, budget and a tentative planning for the preparation and execution of the refurbishment. These aspects together with the prospects of possible cooperation with other parties for the refurbishment programme and the future operation of BR2 will be evaluated by the CEN/SCK Board who has to take a decision early in 1994. Various scenarios are now being considered and evaluated for the refurbishment and the future BR2 operation regime. (author)

  4. Refurbishment, core conversion and safety analysis of Apsara reactor

    Energy Technology Data Exchange (ETDEWEB)

    Raina, V.K.; Sasidharan, K.; Sengupta, S. [Bhabha Atomic Research Centre, Mumbai (India)]. E-mail: nram@@apsara.barc.ernet.in

    1998-07-01

    Apsara, a 1 MWt pool type reactor using HEU fuel has been in operation at the Bhabha Atomic Research Centre, Trombay since 1956. In view of the long service period seen by the reactor it is now planned to carry out extensive refurbishment of the reactor with a view to extend its useful life. It is also proposed to modify the design of the reactor wherein the core will be surrounded by a heavy water reflector tank to obtain a good thermal neutron flux over a large radial distance from the core. Beam holes and the majority of the irradiation facilities will be located inside the reflector tank. The coolant flow direction through the core will be changed from the existing upward flow to downward flow. A delay tank, located inside the pool, is provided to facilitate decay of short lived radioactivity in the coolant outlet from the core in order to bring down radiation field in the operating areas. Analysis of various anticipated operational occurrences and accident conditions like loss of normal power, core coolant flow bypass, fuel channel blockage and degradation of primary coolant pressure boundary have been performed for the proposed design. Details of the proposed design modifications and the safety analyses are given in the paper. (author)

  5. Major Refurbishment of the University of Florida Training Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Joradn, Kelly; Berglund, Matthew; Shea, Brian [Univ., of Florida, Florida (United States)

    2013-07-01

    The research reactor fleet is aging with few replacements being built. At the same time the technology for refurbishment of the older reactors has advanced well beyond that of currently installed equipment. The disparity between new and old technology results in an inability to find simple replacements for the older, highly integrated components. The lack of comprehensive guidance for digital equipment adds to the technical problems of installing individual replacement parts. Up to this point, no U. S. facilities have attempted a complete modernization effort because of the time commitment, financial burden, and licensing required for a total upgrade. The University of Florida Training Reactor is tackling this problem with a replacement of nearly all of the major facility sub-systems, including electrical distribution, reactor controls, nuclear instrumentation, security, building management, and environmental controls. This approach offers increased flexibility over the piece-by-piece replacement method by leveraging modern control systems based on global standards and capable of good data interchange with higher levels of redundancy. The UFTR reviewed numerous technologies to arrive at the final system architecture and this 'clean-slate' installation methodology. It is this concept of total system replacement and strict use of modular, open-standards technology that has allowed for a facility design that will be easy to install, maintain, and build upon over time.

  6. Acoustical qualification of Teatro Nuovo in Spoleto before refurbishing works

    Science.gov (United States)

    Cocchi, Alessandro; Cesare Consumi, Marco; Shimokura, Ryota

    2004-05-01

    To qualify the acoustical quality of an opera house two different approaches are now available: one is based on responses of qualified listeners (subjective judgments) compared with objective values of selected parameters, the other on comparison tests conducted in suited rooms and on a model of the auditory brain system (preference). In the occasion of the refurbishment of an opera house known for the Two Worlds Festival edited yearly by the Italian Composer G. C. Menotti, a large number of measurements were taken with different techniques, so it is possible to compare the different methods and also the results with some geometrical criterion, based on the most simple rules of musical harmony, now neglected as our attention is attracted to computer simulations, computer aided measurement techniques and similar modern methods. From this work some link between well known acoustical parameters (not known at the time when architects sketched the shape of ancient opera houses) and geometrical criteria (well known at the time when ancient opera houses were built) will be shown.

  7. Technological energy and environmental refurbishment of historical Italian libraries

    Directory of Open Access Journals (Sweden)

    Alessandra Battisti

    2014-10-01

    Full Text Available Active libraries in Italy are around 13.000 and, taken as a whole, the property and management relate mainly to public institutions such as the state, regions, local authorities, cultural institutions, universities, and partly to religious institutions and individuals. In this paper is presented the work of studies and research, commissioned to the authors by the General Direction for Libraries of the Ministry of Heritage and Culture (Mibac, which ended recently, addressing the architectural, energy and environmental refurbishment of national historic libraries distributed on the Italian territory, with special focus on 4 among 46 owned by the Ministry of Culture (the Nazionale Centrale di Roma, the Nazionale Centrale in Florence, the national University of Turin and the Angelica in Rome believed by the authors and client as examples of recurring issues and ideals to lend itself to the construction of a model of intervention replicable on other historical Italian libraries.The main objective of the project is the identification of physical and perceptual factors of wear2, which threaten the conservation of the historical and artistic heritage of the historic center of Venice, with a particular focus on the effects of anthropogenic pressure linked to tourism, and the evaluation of their level of danger. A further objective is the recognition of measurable parameters (indicators for monitoring and, subsequently, mitigation strategies for the most significant phenomena.

  8. Major Refurbishment of the University of Florida Training Reactor

    International Nuclear Information System (INIS)

    Joradn, Kelly; Berglund, Matthew; Shea, Brian

    2013-01-01

    The research reactor fleet is aging with few replacements being built. At the same time the technology for refurbishment of the older reactors has advanced well beyond that of currently installed equipment. The disparity between new and old technology results in an inability to find simple replacements for the older, highly integrated components. The lack of comprehensive guidance for digital equipment adds to the technical problems of installing individual replacement parts. Up to this point, no U. S. facilities have attempted a complete modernization effort because of the time commitment, financial burden, and licensing required for a total upgrade. The University of Florida Training Reactor is tackling this problem with a replacement of nearly all of the major facility sub-systems, including electrical distribution, reactor controls, nuclear instrumentation, security, building management, and environmental controls. This approach offers increased flexibility over the piece-by-piece replacement method by leveraging modern control systems based on global standards and capable of good data interchange with higher levels of redundancy. The UFTR reviewed numerous technologies to arrive at the final system architecture and this 'clean-slate' installation methodology. It is this concept of total system replacement and strict use of modular, open-standards technology that has allowed for a facility design that will be easy to install, maintain, and build upon over time

  9. Modernization and Refurbishment of the RECH-1 Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Daie, J. [Nuclear Application Department, Chilean Nuclear Energy Commission (CCHEN), Santiago (Chile)

    2014-08-15

    The Chilean Nuclear Energy Commission (Comisión Chilena de Energía Nuclear, or CCHEN) has operated the RECH-1 research reactor since 1974. This reactor is located at La Reina Nuclear Centre in Santiago, Chile. It is a pool type reactor using LEU MTR fuel assemblies, light water as moderator and coolant, and beryllium as reflector. The reactor has been operated at the nominal power of 5 MW in a continuous shift of 20 hours per week, 48 weeks per year. The main utilizations of the RECH-1 reactor are radioisotope production and neutron activation analysis. Among the most relevant refurbishment and modernization campaigns undertaken at the reactor are: full core conversion to the use of LEU fuel, replacement of the cooling tower, improvement of the containment building by changing the doors and gates and by a better sealant for the penetrations, introduction of an additional source of water by connecting the raw water supply system to the emergency cooling system, improvement of the emergency ventilation system, introduction of a fire detection and alarm system for detection and mitigation to protect the I&C racks, introduction of a radioactive liquid release for those generated at the reactor, introduction of a delay tank degasification system and renewal of the environmental monitoring system. At present we are assessing the possibility of replacing the old analog electronics of control for new digital systems. Detailed descriptions of these diverse activities are presented in the paper. (author)

  10. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  11. Fabrication and Characterization of Targets for Shock Propagation and Radiation Burnthrough Measurements on Be-0.9 AT. % Cu Alloy

    International Nuclear Information System (INIS)

    Nobile, A.; Dropinski, S.C.; Edwards, J.M.; Rivera, G.; Margevicius, R.W.; Sebring, R.J.; Olson, R. E.; Tanner, D.L.

    2004-01-01

    Beryllium-copper alloy (Be0.9%Cu) ICF capsules are being developed for the pursuit of thermonuclear ignition at the National Ignition Facility (NIF). Success of this capsule material requires that its shock propagation and radiation burnthrough characteristics be accurately understood. To this end, experiments are being conducted to measure the shock propagation and radiation burnthrough properties of Be0.9%Cu alloy. These experiments involve measurements on small Be0.9%Cu wedge, step and flat samples. Samples are mounted on 1.6-mm-diameter x 1.2-mm-length hohlraums that are illuminated by the OMEGA laser at the University of Rochester. X-rays produced by the hohlraum drive the sample. A streaked optical pyrometer detects breakout of the shock produced by the X-ray pulse. In this paper we describe synthesis of the alloy material, fabrication and characterization of samples, and assembly of the targets. Samples were produced from Be0.9%Cu alloy that was synthesized by hot isostatic pressing of Be powder and copper flake. Samples were 850 μm diameter disks with varying thickness in the case of wedge and step samples, and uniform thickness in the case of flat samples. Sample thickness varied in the range 10-90 μm. Samples were prepared by precision lathe machining and electric discharge machining. The samples were characterized by a Veeco white light interferometer and an optical thickness measurement device that simultaneously measured the upper and lower surface contours of samples using two confocal laser probes. Several campaigns with these samples have been conducted over the past two years

  12. A State of the Art Report on the Case Study of Hot Cell Decontamination and Refurbishment

    Energy Technology Data Exchange (ETDEWEB)

    Won, H. J.; Jung, C. H.; Moon, J. K.; Park, G. I.; Song, K. C

    2008-08-15

    As the increase of the operation age of the domestic high radiation facilities such as IMEF, PIEF and DFDF, the necessity of decontamination and refurbishment of hot cells in these facilities is also increased. In the near future, the possibilities of refurbishment of hot cells in compliance with the new regulations, the reuse of hot cells for the other purposes and the decommissioning of the facilities also exist. To prepare against the decontamination and refurbishment of hot cells, the reports on the refurbishment, decommissioning and decontamination experiences of hot cells in USA, Japan, France, Belgium and Great Britain were investigated. ANL of USA performed the project on the decontamination of hot cells. The purpose of the project was to practically eliminate the radioactive emissions of Rn-220 to the environment and to restore the hot cells to an empty restricted use condition. The five hot cells were emptied and decontaminated for restricted use. Chemical processing facility in JAEA of Japan was used for the reprocessing study of spent fuels, hot cells in CPF were refurbished from 1995 for the tests of the newly developed reprocessing process. In a first stage, decommissioning and decontamination were fully performed by the remote operation Then, decommissioning and decontamination were performed manually. By the newly developed process, they reported that the radiation exposure of workers were satisfactorily reduced. In the other countries, they also make an effort for the refurbishment and decontamination of hot cells and it is inferred that they accumulate experiences in these fields.

  13. Shakedown Tests for Refurbished and Upgraded Frames and Initiation of Alloy 709 Creep Rupture Tests

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Hong [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Moser, Jeremy L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hawkins, Charles S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Lara-Curzio, Edgar [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-09-01

    This report describes the shakedown tests conducted on the upgraded frames, and initiation of creep rupture tests on refurbished frames. SS316H, a reference material for Alloy 709, was used in shakedown tests, and the tests were conducted at 816 degree C under three stress levels to accumulate 1% creep strain. 1/4” gage diameter specimen design was used. The creep rupture tests on Alloy 709 were initiated at 600 degree C under 330 MPa to target 1,500 h rupture time. 12 specimens with 3/8” gage diameter were prepared from the materials with 6 heat treatment conditions, 2 from each. The required mechanical load under 330MPa was calculated to be 5,286 lb for the 3/8” gage diameter specimen. Among the ART frames, 7 frames are equipped with 10,000 lb load cell including #5 to 8 and #88 to 90, and can be used. 7 tests were thus started in this stage of project, and remaining 5 will be continued whenever any of the 7 tests is completed.

  14. Recent trends in repair and refurbishing of steam turbine components

    Indian Academy of Sciences (India)

    M. Senthilkumar (Newgen Imaging) 1461 1996 Oct 15 13:05:22

    be adequately addressed at various stages of its design and fabrication. ... lead to plant shutdown, loss in production and productivity, fire explosion, radiation or gas ..... component manufacturers, there is a growing necessity for in-house ...

  15. Refurbishment and retrofitting of SF6 gas storage tanks of the pelletron accelerator

    International Nuclear Information System (INIS)

    Reddy, G.R.; Datar, V.M.; Parulekar, Y.M.

    2015-01-01

    The BARC-TIFR Pelletron Accelerator Facility has completed more than twenty six years of successful round-the-clock operation, serving diverse users from institutions within and outside DAE. The main accelerating structure and associated subsystems are housed in the accelerator tank under SF 6 gas medium. During maintenance of the accelerator, the SF 6 gas present in the accelerator tank is transferred in the four storage tanks located on the terrace of the building open to outside environment. These four storage tanks (with ∼ 1/4th of the main tank volume each) are ∼ 4.27 m in diameter and ∼ 10 m in height each and are supported on RCC ring beams which are monolithically connected with the RCC structure below. Over the years, the anchor bolts and the base plates of support structure of storage tanks were found corroded and the foundation RCC ring beam indicated a few corrosion cracks. Health assessment of relevant structures and components were carried out. Considering the limitations of existing anchorage and also giving due considerations for reparability and replaceability, a new anchorage system was designed. The entire refurbishment and retrofitting works pertaining to the four SF 6 gas storage tanks was executed in a time bound manner to comply with the then PASC (Particle Accelerator Safety Committee) recommendations successfully, without disrupting the operations of the round-the-clock running Pelletron Accelerator facility. In addition, the thickness measurements for the storage tanks were performed. The relief valves and rupture disc assemblies across the storage tanks were replaced and reinstalled after introducing appropriate manual valves as suggested by the PASC. A new test set up was fabricated to perform pneumatic testing at the recommended pressure off-line for these relief valves and rupture disc assemblies prior to reinstallation. This paper describes the comprehensive rehabilitation and retrofitting procedures that were carried out at the

  16. System impact of energy efficient building refurbishment within a district heated region

    International Nuclear Information System (INIS)

    Lidberg, T.; Olofsson, T.; Trygg, L.

    2016-01-01

    The energy efficiency of the European building stock needs to be increased in order to fulfill the climate goals of the European Union. To be able to evaluate the impact of energy efficient refurbishment in matters of greenhouse gas emissions, it is necessary to apply a system perspective where not only the building but also the surrounding energy system is taken into consideration. This study examines the impact that energy efficient refurbishment of multi-family buildings has on the district heating and the electricity production. It also investigates the impact on electricity utilization and emissions of greenhouse gases. The results from the simulation of four energy efficiency building refurbishment packages were used to evaluate the impact on the district heating system. The packages were chosen to show the difference between refurbishment actions that increase the use of electricity when lowering the heat demand, and actions that lower the heat demand without increasing the electricity use. The energy system cost optimization modeling tool MODEST (Model for Optimization of Dynamic Energy Systems with Time-Dependent Components and Boundary Conditions) was used. When comparing two refurbishment packages with the same annual district heating use, this study shows that a package including changes in the building envelope decreases the greenhouse gas emissions more than a package including ventilation measures. - Highlights: • Choice of building refurbishment measures leads to differences in system impact. • Building refurbishment in district heating systems reduces co-produced electricity. • Valuing biomass as a limited resource is crucial when assessing global GHG impact. • Building envelope measures decrease GHG (greenhouse gas) emissions more than ventilation measures.

  17. The impact of building orientation and discount rates on a Portuguese reference building refurbishment decision

    International Nuclear Information System (INIS)

    Brandão de Vasconcelos, Ana; Cabaço, António; Pinheiro, Manuel Duarte; Manso, Armando

    2016-01-01

    Refurbishment, as part of the construction industry, has a strong global impact, not only from the viewpoint of economies but also from social and energy-efficiency perspectives. A thermal refurbishment process, in particular, involves numerous decisions and choices; the decision-makers being ultimately confronted with two major questions: which criterion should be adopted in the choice of the refurbishment construction solutions and which refurbishment construction solutions should be chosen? In this paper, a criterion based on technical and economic points of view is proposed, aiming to identify the cost-optimal package of energy efficient solutions from among a set of possible refurbishment measures, within the life cycle of buildings. Sensitivity analyses are also performed so that the results may help the decision-maker choose the appropriate refurbishment solutions to be adopted when different discount rates and building orientations are taken into consideration. A total of seven scenarios, for a macroeconomic perspective, and nine, for a financial perspective, are performed. The costoptimal methodology adopted, following the Directive 2010/31/EU (2010) recommendations, is applied to a Portuguese reference building. The analysis carried out allows obtaining low global life cycle costs solutions and points towards nearly Zero Energy Building (nZEB) concept. The results are important for drawing national political instruments on buildings energy efficiency. - Highlights: •Building refurbishment decision based on technical and economic points of view. •35.000 Packages of thermal rehabilitation solutions considered. •Building orientation and discount rate impact on the cost-optimal package of solutions. •Portuguese reference building case base.

  18. The effects of acoustical refurbishment of classrooms on teachers’ perceived noise exposure and noise-related health symptoms

    DEFF Research Database (Denmark)

    Kristiansen, Jesper; Lund, Søren Peter; Persson, Roger

    2015-01-01

    lessons with circa 2 dB(A) in both schools. Conclusion: The acoustical refurbishment was associated with a reduction in classroom reverberation time and activity sound levels in both schools. The acoustical refurbishment was associated with a reduction in the teachers’ perceived noise exposure...... of RT and activity sound levels were measured before and after refurbishment. Data on perceived noise exposure, disturbance attributed to different noise sources, voice symptoms, and fatigue after work were collected over a year in a total of six consecutive questionnaires. Results: Refurbished......, the mean classroom reverberation time was 0.68 (school A) and 0.57 (school B) and 0.55 s in sham refurbished classrooms. After refurbishment, the RT was approximately 0.4 s in both schools. Activity sound level measurements confirmed that the intervention had reduced the equivalent sound levels during...

  19. Effect of positively charged particles on sputtering damage of organic electro-luminescent diodes with Mg:Ag alloy electrodes fabricated by facing target sputtering

    Directory of Open Access Journals (Sweden)

    Kouji Suemori

    2017-04-01

    Full Text Available We investigated the influence of the positively charged particles generated during sputtering on the performances of organic light-emitting diodes (OLEDs with Mg:Ag alloy electrodes fabricated by sputtering. The number of positively charged particles increased by several orders of magnitude when the target current was increased from 0.1 A to 2.5 A. When a high target current was used, many positively charged particles with energies higher than the bond energy of single C–C bonds, which are typically found in organic molecules, were generated. In this situation, we observed serious OLED performance degradation. On the other hand, when a low target current was used, OLED performance degradation was not observed when the number of positively charged particles colliding with the organic underlayer increased. We concluded that sputtering damage caused by positively charged particles can be avoided by using a low target current.

  20. Refurbishment programme of the reactor and progress of work

    International Nuclear Information System (INIS)

    Astruc, J.M.

    1992-01-01

    During 20 years of operation, since its start-up the ILL there have been some problems, like ruptured heavy water collector, in the upper part of the reflector tank, replacement of all the beam tubes due to the evolution of the mechanical characteristics of the aluminium alloy under irradiation. Some days after regular shutdown for maintenance, an inspection of the internal elements of the reactor discovered cracks on the grids which ensure the regular flow of cooling water. The investigations showed that the cracks are due to a design fault, aggravated by the effects of mechanical fatigue on highly irradiated material. It was not possible to repair the cracked grid, and it had to be replaced. This involved the dismantling of the internals parts of the reactor tank. The reactor refurbishment programme was set up. It provides for the replacement of the reactor block, the coupling sleeves, the anti turbulence grids and the diffuser, and of the ancillary elements. The main items to be replaced are: the reactor block consisting of the reactor vessel and its cover, known as the 'upper structure'; the heavy water collectors; connecting sleeves between the reactor block and the flanges of the various beam tubes. These three items constitute the primary circuit in the swimming pool. It is also planned to replace some internal parts of the reactor tank, such as the beam-tubes, the grid and diffuser and the chimney. Some parts of the present reactor, which are not at the end of their life, would be reused, for instance the two cold sources, the safety rods, and some other pieces. The parts replaced would be cut up and packaged in accordance with current standards and disposed of. All items are in principle to be replaced by identical equipment. This concerns in particular performance, mechanical characteristics and the choice of materials. The replacement of the reactor block necessitates a complete dismantling of the equipment in the reactor block, and of the structures in

  1. Coordination Devices in the Refurbishment Design Process: A Partial-Correlation Approach

    Directory of Open Access Journals (Sweden)

    Azlan Shah Ali

    2009-12-01

    Full Text Available Building refurbishment is an important sector in the Malaysian construction industry. The increase the number of building renovations, alterations, extensions and extensive repair works contributed to the high demand for refurbishment projects. However, refurbishment projects are more difficult to manage compared to new-built, due to uncertainty factors inherent in the projects. Therefore, this paper identifies factors that contributed to uncertainty and shows how it affects design performance of refurbishment projects. This paper was also extended to the used of coordination devices to improve design performance from the effect of uncertainty in the projects. Partial-correlation technique was used in data analysis to check any significant moderate effects of coordination devices to control the negative effect of uncertainty on design performance of refurbishment projects. Four (4 coordination devices involved in the partial-correlation tests. The results concluded that the use of lateral relations and architect’s characteristics are most likely reducing the uncertainty of client attributes towards design completeness before work started on site.

  2. Investigation on non-glass laser fusion targets: their fabrication, characterization, and transport. Charged Particle Research Laboratory report No. 2-81, progress report, June 1, 1980-January 31, 1981

    International Nuclear Information System (INIS)

    Kim, K.

    1981-01-01

    A summary is presented of the research progress made under LLNL Subcontract 8320003 for the period of June 1, 1980 through January 31, 1981. The main theme of the research has continued to be the development of techniques for fabricating, characterizing, and transporting laser fusion targets on a continuous basis. The target fabrication techniques are intended mainly for non-glass spherical shell targets, both cryogenic and non-cryogenic. Specifically, progress has been made in each of the following categories. (1) Investigation of liquid hydrogen behavior inside a spherical laser fusion target. (2) Development of automated target characterization scheme. (3) Study of cryogenic target fabrication scheme utilizing cold-gas-levitation and electric field positioning. (4) Development of a cryogenic target fabrication system based on target free-fall method. (5) Generation of hydrogen powder using electro-hydrodynamic spraying. (6) Study of target-charging techniques for application to contactless cryogenic target fabrication. (7) Development of hollow metal sphere production technique. A brief summary of the research progress made in each category is presented

  3. Structural radioactive waste from 'retubing/refurbishment' of Embalse nuclear power plant. Regulatory perspective

    International Nuclear Information System (INIS)

    Alvarez, Daniela E.; Lee Gonzales, Horacio M.; Medici, Marcela A.; Piumetti, Elsa H.

    2009-01-01

    Unlike the building of a new nuclear reactor, the 'retubing / refurbishment' of nuclear reactors that have been in operation for many years, involves the replacement of components in a radioactive environment. This requires a carefully planned radiation protection program to ensure protection of workers, the public and the environment as well as a radioactive waste management program for those radioactive waste generated during the process, which go beyond those generated during the normal operation and maintenance of the plant. Nucleoelectrica Argentina Sociedad Anonima (NA-SA) is scheduled to conduct the Life Extension Process of Embalse Nuclear Power Plant (CNE) which essentially consist of 'retubing / refurbishment' of the installation. The Nuclear Regulatory Authority (ARN) will then have an important activity related to the above process. In particular, this paper will describe some points of interest related to the generation and management of radioactive waste during the 'retubing / refurbishment' of the CNE, from the regulatory point of view. (author)

  4. Analysis of the cost for the refurbishment of small hydropower plants

    International Nuclear Information System (INIS)

    Ogayar, B.; Vidal, P.G.; Hernandez, J.C.

    2009-01-01

    In view of all the concerns associated with fossil fuels and energy demand it is appropriate to investigate the large number of abandoned small hydropower plants. In order to solve the difficulty implied, by a viability study on the refurbishment of a small hydropower plant, a series of simple equations has been developed based on the economic optimization of the different elements. These equations can also be used for completely new hydropower plants. The result of this study will allow us to obtain quite approximate costs for the refurbishment of old hydropower plants, or the construction of new ones. These data on costs will act as a reference to examine real possibilities of refurbishment through different tools of financial and economic analysis. Although the equations developed have used unitary prices referring to Spain, they will be applicable to other countries just changing those prices for those of the country, required. (author)

  5. Making the home consume less - putting energy efficiency on the refurbishment agenda

    Energy Technology Data Exchange (ETDEWEB)

    Stiess, Immanuel; Deffner, Jutta (Inst. for Social-Ecological Research ISOE GmbH (Germany)). e-mail: stiess@isoe.de; Zundel, Stefan (Lausitz Univ. of Applied Sciences (Germany))

    2009-07-01

    Private home owners can reduce their energy use significantly and move towards a low carbon lifestyle by retrofitting their homes in an energy efficient standard. Despite high awareness for energy efficiency and rising energy prices, home owners only slowly take this opportunity to cut down their personal energy use and carbon emission significantly. In many cases, maintenance and repair activities only result in incremental improvements of energy efficiency. Thus, the dynamics of refurbishment seems to have a conservative bias. Against this background, we will present results from an empirical survey, focussing on home owners' maintenance and refurbishment decisions. Drawing on approaches from social-psychology, lifestyle analysis and evolutionary economics, we will explore the impact of attitudes, lifestyle orientations, cognitive frameworks and social resources on refurbishment decision especially on energy efficient ones and present a model integrating the most important driving factors.

  6. Fabrication and replacement work of beryllium frame and gamma-ray shield

    International Nuclear Information System (INIS)

    Watahiki, Shunsuke; Hanawa, Yoshio; Asano, Norikazu; Hiyama, Kazuhisa; Ito, Sachito; Tsuboi, Kazuaki; Fukasaku, Akitomi

    2012-03-01

    This replacement work was carried out under refurbishment plan of JMTR for beryllium distortion draw to acceptable limit. And gamma-ray shield refurbishment was carried out the view point of prevention maintenance in consideration of operation plan. Fabrication of beryllium frame and gamma-ray shield was spent for two years it was finished in February, 2010. It took five months to replacement work from January 2010. In this report is presented fabrication and replacement work of beryllium frame and gamma-ray shield. (author)

  7. Refurbishing of a Freeze Drying Machine, used in Nuclear Medicine for Radiopharmaceuticals Production

    International Nuclear Information System (INIS)

    Gaytan-Gallardo, E.; Desales-Galeana, G.

    2006-01-01

    The refurbishing of a freeze drying machine used in the radiopharmaceuticals production, applied in nuclear medicine in the Radioactive Materials Department of the Nuclear Research National Institute in Mexico (ININ in Spanish), is presented. The freeze drying machine was acquired in the 80's decade and some components started having problems. Then it was necessary to refurbish this equipment by changing old cam-type temperature controllers and outdated recording devices, developing a sophisticated software system that substitutes those devices. The system is composed by a freeze drying machine by Hull, AC output modules for improved temperature control, a commercial data acquisition card, and the software system

  8. Fabrication of targets for transmutation of americium : synthesis of inertial matrix by sol-gel method. Procedure study on the infiltration of a radioactive solutions

    International Nuclear Information System (INIS)

    Fernandez Carretero, A.

    2002-01-01

    Transmutation and incineration are innovative options in the management and disposal of fission products and actinides. nevertheless, the fabrication of targets for transmutation and incineration of actinides and fission products require a reconsideration of conventional processes (mechanical blending) and the development of new procedures compatible with the high activity of these materials. This work presents th R and D of a new fabrication method called INRAM (Infiltration of Radioactive Materials) based on the infiltration of an actinide solution in a porous non radiotoxic material in the form of a pellet (up to 12% An), or beads (up to 40% An) produced by sol-gel. The first method have been used for the fabrication of spinel (MgAl 2 O 4 ) targets containing 11% Am, which have been irradiated in HFR-Petten (358.4 full power days). Post-test burn-up calculations showed that at the end of the irradiation the initial Am-241 concentration was reduced to 4%. The fraction of the initial americum atoms that have been fissioned is 28%. The main advantage of the INRAM method is that matrices with low or zero activity can be fabricated and formed into the required shape in an unshielded facility. This method offers other advantages over conventional ones, such as the active wastes are reduced, is easy to automate, adoptable to telemanipulation and dust free, which facilitate operator intervention and minimise radiation exposure to the personal. In addition, the infiltrant needs only be present in liquid form, i. e. it could be transferred directly from the reprocessing plant for fabrication into targets without conversion into-solid form. In order to optimise the infiltration process in depth investigations of all important process parameters, e. g. infiltration kinetics and metal (pu, Am) concentration in the feed solution, and also on extensive study or powder metallurgy parameters for the preparation of high quality fuel pellets with a high density, have been made. In

  9. Synthesis of ITO Powder by Dry Process and Lifetime Characteristics of the ITO Target Fabricated with its Powder

    Science.gov (United States)

    Takahashi, Seiichiro; Itoh, Hironori; Komatsu, Ryuichi

    Lifetime of an indium tin oxide (ITO) target is an important characteristic in the production of liquid crystal displays (LCDs). Increasing the sintering density of the ITO target is assumed to lead to an increased lifetime. So far, it has been clarified that the carbon concentration in In2O3 powder, the raw material of ITO targets, influences remarkably the target lifetime. In this study, with the aim of reducing the concentration of carbon in In2O3 powder, the synthesis of In2O3 powder containing dissolved Sn by a dry process was performed.

  10. Fabrication and characterization of tungsten and graphite based PFC for divertor target elements of ITER like tokamak application

    Energy Technology Data Exchange (ETDEWEB)

    Khirwadkar, S.S., E-mail: sameer@ipr.res.in [Institute For Plasma Research, Bhat, Gandhinagar, Gujarat (India); Singh, K.P.; Patil, Y.; Khan, M.S.; Buch, J.J.U.; Patel, Alpesh; Tripathi, Sudhir [Institute For Plasma Research, Bhat, Gandhinagar, Gujarat (India); Jaman, P.M.; Rangaraj, L.; Divakar, C. [Materials Science Division, National Aerospace Laboratories, CSIR, Bangalore, Karnataka (India)

    2011-10-15

    The development of the fabrication technology of macro-brush configuration of tungsten (W) and carbon (graphite and CFC) plasma facing components (PFCs) for ITER like tokamak application is presented. The fabrication of qualified joint of PFC is a requirement for fusion tokamak. Vacuum brazing method has been employed for joining of W/CuCrZr and C/CuCrZr. Oxygen free high conductivity (OFHC) copper casting on W tiles was performed followed by machining, polishing and ultrasonic cleaning of the samples prior to vacuum brazing. The W/CuCrZr and graphite/CuCrZr based test mockups were vacuum brazed using silver free alloys. The mechanical shear and tensile strengths were evaluated for the W/CuCrZr and graphite/CuCrZr brazed joint samples. The micro-structural examination of the joints showed smooth interface. The details of fabrication and characterization procedure for macro-brush tungsten and carbon based PFC test mockups are presented.

  11. RA Reactor operation and maintenance (I-IX), part VII, Task 3.08/04, Refurbishment of the RA reactor

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    This volume covers the following reports concerned with the maintenance and repair work of the RA reactor: repair of the technical water system; maintenance of the transportation equipment; vacuuming and drying during refurbishment; repair and decontamination of the distillation device; and the report on participation of the operational dosimetry division in the RA reactor refurbishment activities

  12. Building performance simulation as a design tool for refurbishment of buildings

    NARCIS (Netherlands)

    Hensen, J.L.M.; Bartak, M.; Drkal, F.; Dunovska, T.; Lain, M.; Matuska, T.; Schwarzer, J.; Sourek, B.; Bednar, T.

    2004-01-01

    This paper attempts to outline the current state-of-the-art regarding the use of building performance simulation as a design tool for refurbishment of buildings. This is illus-trated by means of three recent studies for conversion of historical buildings (an early 20th century factory, and a water

  13. LECA refurbishment project or how to get ready for the next ten years

    Energy Technology Data Exchange (ETDEWEB)

    Boussard, Francois; Bois, Dominique; Blanc, Jean Yves

    2005-01-01

    Around 1995, CEA decided a strategy for its hot laboratories: Closing LAMA - Grenoble and LHA - Saclay, after RM2 - Fontenay-aux-Roses. Refurbishing and gathering irradiated material studies in LECI - Saclay. Refurbishing LECA - Cadarache for irradiated fuel examinations. Reprocessing pilot experiments being located in Atalante - Marcoule. Started up in 1964, LECA has got an exploitation license up to August 2005. In 2001, safety authorities agreed to extend it up to 2015, provided an extensive refurbishment is undertaken which includes civil engineering works to achieve the building earthquake resistance, based on 3D-computations and withstanding maximum historically likely earthquake, improving confinement by decontaminating, adding steel boxes inside cells, changing ventilation system and creating a mobile upper cell on the cell roof, changing power supplies, shielded glasses and most manipulators, improving travelling crane, fire protection, radioactivity monitoring and alarms, installing a new device for characterizing and evacuating wastes, decreasing the fissile mass stored inside the facility (source term). Most of the work should be ended by the end of 2005. Afterwards five cells, which do not withstand earthquake, will be deconstructed within 3 years. By mid 2004, 60 % of tasks are completed and all contracts are awarded. The total final cost is 97 M Euro, 80% of which regarding the only LECA refurbishment. (Author)

  14. Refurbishment of the regulating and control equipment, Task 3.08/04-05

    International Nuclear Information System (INIS)

    Nikolic, M.; Popovic, B.

    1963-01-01

    In addition to the planned refurbishment and maintenance of the RA reactor control and regulating systems, this report describes the maintenance of the reactor protection and safety systems. According to the instructions included in this report the components of these systems were tested to verify their reliability

  15. Physicochemical characteristics and occupational exposure to coarse, fine and ultrafine particles during building refurbishment activities

    Energy Technology Data Exchange (ETDEWEB)

    Azarmi, Farhad; Kumar, Prashant, E-mail: p.kumar@surrey.ac.uk, E-mail: prashant.kumar@cantab.net; Mulheron, Mike [University of Surrey, Department of Civil and Environmental Engineering, Faculty of Engineering and Physical Sciences (United Kingdom); Colaux, Julien L.; Jeynes, Chris [University of Surrey, Faculty of Engineering and Physical Sciences, Ion Beam Centre (United Kingdom); Adhami, Siavash; Watts, John F. [University of Surrey, The Surface Analysis Laboratory, Faculty of Engineering and Physical Sciences (United Kingdom)

    2015-08-15

    Understanding of the emissions of coarse (PM{sub 10} ≤10 μm), fine (PM{sub 2.5} ≤2.5 μm) and ultrafine particles (UFP <100 nm) from refurbishment activities and their dispersion into the nearby environment is of primary importance for developing efficient risk assessment and management strategies in the construction and demolition industry. This study investigates the release, occupational exposure and physicochemical properties of particulate matter, including UFPs, from over 20 different refurbishment activities occurring at an operational building site. Particles were measured in the 5–10,000-nm-size range using a fast response differential mobility spectrometer and a GRIMM particle spectrometer for 55 h over 8 days. The UFPs were found to account for >90 % of the total particle number concentrations and <10 % of the total mass concentrations released during the recorded activities. The highest UFP concentrations were 4860, 740, 650 and 500 times above the background value during wall-chasing, drilling, cementing and general demolition activities, respectively. Scanning electron microscopy, X-ray photoelectron spectroscopy and ion beam analysis were used to identify physicochemical characteristics of particles and attribute them to probable sources considering the size and the nature of the particles. The results confirm that refurbishment activities produce significant levels (both number and mass) of airborne particles, indicating a need to develop appropriate regulations for the control of occupational exposure of operatives undertaking building refurbishment.

  16. A Guide to Energy Efficient Refurbishment. Maintenance and Renewal in Educational Buildings. Building Bulletin 73.

    Science.gov (United States)

    Department for Education and Employment, London (England). Architects and Building Branch.

    With little or relatively modest investment, schools being refurbished or undergoing maintenance can make disproportionately large gains in energy efficiency that can also result in large financial savings. This document offers guidance on the selection of appropriate measures that can improve a facility's energy efficiency, depending on the type…

  17. An Overview of Ageing Management and Refurbishment of Research Reactors at Trombay

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, R. C.; Raina, V. K. [Bhabha Atomic Research Centre, Mumbai (India)

    2014-08-15

    Three nuclear research reactors have been in operation at Bhabha Atomic Research Centre, Mumbai, India. India has a rich experience of about 120 research reactor operating years including ageing management. A well structured programme is in force for plant life management, refurbishment and upgrading reactors in operation. Apsara, commissioned in August 1956, was the first research reactor. Apsara is a 1 MW{sub th} swimming pool type of reactor with a movable core loaded with enriched uranium fuel and immersed in demineralized light water pool, which serves as coolant, moderator and reflector besides providing radiation shielding. Apsara was shut down during May 2009 for partial decommissioning and upgrading to a 2 MW reactor with several safety upgrades, e.g. a LEU based reactor core with higher neutron flux, a new reactor building meeting seismic qualification criteria and two independent shutdown devices. Cirus, a 40 MW{sub th} tank type reactor utilizing heavy water as moderator, graphite as reflector, demineralized light water as primary coolant and natural uranium metal as fuel; has been in operation since 1960. After about three decade of operation, the availability factor started declining mainly due to outage of equipment exhibiting signs of ageing. After ageing studies and performance review, refurbishment requirements were identified. A programme for refurbishment was drawn that included safety upgrades like civil repairs to the emergency storage reservoir to meet seismic qualification criteria and a new iodine removal system for better efficiency. The reactor was shut down during 1997 for execution of this refurbishment programme. After completion of refurbishment, the reactor was brought back into operation during 2003. It has completed about seven years of safe operation after refurbishment with a significant increase in availability factor from 70% to about 90%. The reactor was permanently shut down during December 2010. The reactor core was unloaded

  18. Indium oxide co-doped with tin and zinc: A simple route to highly conducting high density targets for TCO thin-film fabrication

    Science.gov (United States)

    Saadeddin, I.; Hilal, H. S.; Decourt, R.; Campet, G.; Pecquenard, B.

    2012-07-01

    Indium oxide co-doped with tin and zinc (ITZO) ceramics have been successfully prepared by direct sintering of the powders mixture at 1300 °C. This allowed us to easily fabricate large highly dense target suitable for sputtering transparent conducting oxide (TCO) films, without using any cold or hot pressing techniques. Hence, the optimized ITZO ceramic reaches a high relative bulk density (˜ 92% of In2O3 theoretical density) and higher than the well-known indium oxide doped with tin (ITO) prepared under similar conditions. All X-ray diagrams obtained for ITZO ceramics confirms a bixbyte structure typical for In2O3 only. This indicates a higher solubility limit of Sn and Zn when they are co-doped into In2O3 forming a solid-solution. A very low value of electrical resistivity is obtained for [In2O3:Sn0.10]:Zn0.10 (1.7 × 10-3 Ω cm, lower than ITO counterpart) which could be fabricated to high dense ceramic target suing pressure-less sintering.

  19. BIM-Based Timber Structures Refurbishment of the Immovable Heritage Listed Buildings

    Science.gov (United States)

    Henek, Vladan; Venkrbec, Václav

    2017-12-01

    The use of Building information model (BIM) design tools is no longer an exception, but a common issue. When designing new buildings or complex renovations using BIM, the benefits have already been repeatedly published. The essence of BIM is to create a multidimensional geometric model of a planned building electronically on a computer, supplemented with the necessary information in advance of the construction process. Refurbishment is a specific process that combines both - new structures and demolished structures, or structures that need to be dismantled, repaired, and then returned to the original position. Often it can be historically valuable part of the building. BIM-based repairs and refurbishments of the constructions, especially complicated repairs of the structures of roof trusses of immovable heritage listed buildings, have not yet been credibly presented. However, the use of BIM tools may be advantageous in this area, because user can quickly response to the necessary changes that may be needed during refurbishments, but also in connection with the quick assessment and cost estimation of any unexpected additional works. The paper deals with the use of BIM in the field of repairs and refurbishment of the buildings in general. The emphasis on monumentally protected elements was priority. Advantage of the proposal research is demonstrated on case study of the refurbishment of the immovable heritage listed truss roof. According to this study, this construction was realized in the Czech Republic. Case study consists of 3D modelled truss parts and the connected technological workflow base. The project work was carried out in one common model environment.

  20. Final report on production of Pu-238 in commercial power reactors: target fabrication, postirradiation examination, and plutonium and neptunium recovery

    International Nuclear Information System (INIS)

    Pobereskin, M.; Langendorfer, W.; Lowry, L.; Farmelo, D.; Scotti, V.; Kruger, O.

    1975-01-01

    Considerable interest has been generated in more extensive applications of radioisotope thermoelectric generator (RTG) systems. This raises questions concerning the availability of 238 Pu to supply an expanding demand. The development of much of this demand will depend upon a considerable reduction in cost of 238 Pu. Two neptunia--zirconia--fuel target rods, containing four sections each of different NpO 2 concentrations, were irradiated in the Connecticut Yankee Reactor for approximately one year. Following irradiation both target rods were subjected to nondestructive examination. One rod was chosen for destructive testing and analysis. Post-irradiation chemical analyses included total Pu and Np, ppM 236 Pu/ 238 Pu, and Pu isotopic abundance. The results of these analyses and of electron microprobe analysis which provided the relative Pu concentration across the pellet diameters are tabulated. It was concluded that the feasibility of all operations involved in the production of 238 Pu by irradiation of 237 NpO 2 targets in commercial nuclear power reactors was demonstrated and that the demonstration should be extended to a pilot-scale leading to installation of a full production capacity. (U.S.)

  1. Report on participation of the operational dosimetry division in refurbishment of the RA reactor, Task 3.08/04-13

    International Nuclear Information System (INIS)

    Ninkovic, M.

    1963-01-01

    During the refurbishment of the RA reactor, from January to June 1963 the division of operational division had a very important role and comprehensive tasks. To enable safety of the staff it was necessary to provide protection clothes, personnel dosemeters; permanent monitoring of radiation doses; strict control of the procedures for completing the planned maintenance and repair operations to avoid contamination of the personnel and working space. The refurbishment activities described in this report are: removal of fuel from the core; refurbishment of the heavy water system; decontamination of the distillation equipment; repair of the gas system

  2. Minimalism in fabrication of self-organized nanogels holding both anti-cancer drug and targeting moiety.

    Science.gov (United States)

    Kim, Sungwon; Park, Kyong Mi; Ko, Jin Young; Kwon, Ick Chan; Cho, Hyeon Geun; Kang, Dongmin; Yu, In Tag; Kim, Kwangmeyung; Na, Kun

    2008-05-01

    Recent researches to develop nano-carrier systems in anti-cancer drug delivery have focused on more complicated design to improve therapeutic efficacy and to reduce side effects. Although such efforts have great impact to biomedical science and engineering, the complexity has been a huddle because of clinical and economic problems. In order to overcome the problems, a simplest strategy to fabricate nano-carriers to deliver doxorubicin (DOX) was proposed in the present study. Two significant subjects (i) formation of nanoparticles loading and releasing DOX and (ii) binding specificity of them to cells, were examined. Folic acid (FA) was directly coupled with pullulan (Pul) backbone by ester linkage (FA/Pul conjugate) and the degree of substitution (DS) was varied, which were confirmed by 1H NMR and UV spectrophotometry. Light scattering results revealed that the nanogels possessed two major size distributions around 70 and 270 nm in an aqueous solution. Their critical aggregation concentrations (CACs) were less than 10 microg/mL, which are lower than general critical micelle concentrations (CMCs) of low-molecular-weight surfactants. Transmission electron microscopy (TEM) images showed well-dispersed nanogel morphology in a dried state. Depending on the DS, the nanogels showed different DOX-loading and releasing profiles. The DOX release rate from FA8/Pul (with the highest DS) for 24h was slower than that from FA4/or FA6/Pul, indicating that the FA worked as a hydrophobic moiety for drug holding. Cellular uptake of the nanogels (KB cells) was also monitored by confocal microscopy. All nanogels were internalized regardless of the DS of FA. Based on the results, the objectives of this study, to suggest a new method overcoming the complications in the drug carrier design, were successfully verified.

  3. Intrinsic ZnO films fabricated by DC sputtering from oxygen-deficient targets for Cu(In,Ga)Se2 solar cell application

    Institute of Scientific and Technical Information of China (English)

    Chongyin Yang; DongyunWan; Zhou Wang; Fuqiang Huang

    2011-01-01

    Intrinsic zinc oxide films, normally deposited by radio frequency (RF) sputtering, are fabricated by direct current (DC) sputtering. The oxygen-deficient targets are prepared via a newly developed double crucible method. The 800-nm-thick film obtaines significantly higher carrier mobility compareing with that of the 800-nm-thick ZnO film. This is achieved by the widely used RF sputtering, which favors the prevention of carrier recombination at the interfaces and reduction of the series resistance of solar cells. The optimal ZnO film is used in a Cu (In, Ga) Se2 (CIGS) solar cell with a high efficiency of 11.57%. This letter demonstrates that the insulating ZnO films can be deposited by DC sputtering from oxygen-deficient ZnO targets to lower the cost of thin film solar cells.%Intrinsic zinc oxide films,normally deposited by radio frequency (RF) sputtering,are fabricated by direct current (DC) sputtering.The oxygen-deficient targets are prepared via a newly developed double crucible method.The 800-nm-thick film obtaines significantly higher carrier mobility compareing with that of the 800-nm-thick ZnO film.This is achieved by the widely used RF sputtering,which favors the prevention of carrier recombination at the interfaces and reduction of the series resistance of solar cells.The optimal ZnO film is used in a Cu (In,Ga) Se2 (C1GS) solar cell with a high efficiency of 11.57%.This letter demonstrates that the insulating ZnO films can be deposited by DC sputtering from oxygen-deficient ZnO targets to lower the cost of thin film solar cells.High resistance transparent intrinsic zinc oxide (i-ZnO)thin film has been widely nsed as the front electrode in transparent electronics and photovoltaic devices because of its low cost and nontoxicity.Owing to its unique characteristics of high transparency and adjustable resistivity in a certain range,the use of i-ZnO thin films as diffusion barrier layers of a-Si/μc-Si,CdTe,and CIGS thin-film solar cells has been advantageous

  4. Analytical cell decontamination and shielding window refurbishment. Final report, March 1984-March 1985

    International Nuclear Information System (INIS)

    Smokowski, R.T.

    1985-01-01

    This is a report on the decontamination and refurbishment of five inactive contaminated analytical cells and six zinc bromide filled shielding windows. The analytical cells became contaminated during the nuclear fuel reprocessing carried out by Nuclear Fuel Services from 1966 to 1972. The decontamination and decommissioning (D and D) work was performed in these cells to make them useful as laboratories in support of the West Valley Demonstration Project. To accomplish this objective, unnecessary equipment was removed from these cells. Necessary equipment and the interior of each cell were decontaminated and repaired. The shielding windows, essentially tanks holding zinc bromide, were drained and disassembled. The deteriorated, opaque zinc bromide was refined to optical clarity and returned to the tanks. All wastes generated in this operation were characterized and disposed of properly. All the decontamination and refurbishment was accomplished within 13 months. The Analytical Hot Cell has been turned over to Analytical Chemistry for the performance high-level waste (HLW) characterization analysis

  5. Decision-making process to shut down, refurbish/modify, or decommission research reactors

    International Nuclear Information System (INIS)

    Stover, R.L.; Murphie, W.E.

    1992-01-01

    Most US research reactors were built more than 20 years ago and some more than 40 years ago. Many have undergone refurbishments and modifications to update their safety systems and experimental capabilities. But changing safety bases, social concerns, and budget constraints have required research reactor operators to continually make decisions to shut down or refurbish/modify their facilities. These decisions involve potential replacement of reactor equipment that has reached its lifetime limits. Changes in philosophy and operation of the reactors are also factors to be considered. In this paper, each of the four factors involved in the decision-making process are discussed in detail. Then, several examples from DOE research reactors in the United States are discussed. Finally, some general conclusions are given to aid in the decision-making process

  6. Refurbish research and test reactors corresponding to global age of nuclear energy

    International Nuclear Information System (INIS)

    Mishima, Kaichiro; Oyama, Yukio; Okamoto, Koji; Yamana, Hajime; Yamaguchi, Akira

    2011-01-01

    This special article featured arguments for refurbishment of research and test reactors corresponding to global age of nuclear energy, based on the report: 'Investigation of research facilities necessary for future joint usage' issued by the special committee of Atomic Energy Society of Japan (AESJ) in September 2010. It consisted of six papers titled as 'Introduction-establishment of AESJ special committee for investigation', 'State of research and test reactors in Japan', 'State of overseas research and test reactors', 'Needs analysis for research and test reactors', 'Proposal of AESJ special committee' and 'Summary and future issues'. In order to develop human resources and promote research and development needed in global age of nuclear energy, research and test reactors would be refurbished as an Asian regional center of excellence. (T. Tanaka)

  7. Refurbishment and upgrading of Iron Gates I Hydroelectric and Navigation System on the Danube River

    International Nuclear Information System (INIS)

    Scvortov, F.; Vasiliu, A.; Rosca, N.

    1996-01-01

    This work shows the problems of the refurbishing the hydroelectric units of the Iron Gates 1 Hydroelectric and Navigation System, operating since 1970. Their long and intensive utilization leads to the necessity of their refurbishment. One is demonstrated by detailed studies that it is sensible and efficient to perform both rehabilitation of the existent hydroelectric units and their power increasing from 175 MW to 190 MW, and prior to all these, as a first step, to install an additional hydroelectric unit (G7) for each system with a capacity of 190 MW. Complex technical and energetic-economical problems appear in realizing this objective due to the necessity of analysing a great volume of data in view of taking a correct decision. (author). 7 figs

  8. Sustainable refurbishment of exterior walls and building facades. Final report, Part A - Methods and recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Hakkinen, T. (ed.)

    2012-11-01

    This report is the final report of Sustainable refurbishment of building facades and exterior walls (SUSREF). SUSREF project was a collaborative (small/medium size) research project within the 7th Framework Programme of the Commission and it was financed under the theme Environment (including climate change) (Grant agreement no. 226858). The project started in October 1st 2009 and ended in April 30th 2012. The project included 11 partners from five countries. SUSREF developed sustainable concepts and technologies for the refurbishment of building facades and external walls. This report together with SUSREF Final report Part B and SUSREF Final Report Part C introduce the main results of the project. Part A focuses on methodological issues. The descriptions of the concepts and the assessment results of the developed concepts are presented in SUSREF Final report part B (generic concepts) and SUSREF Final report Part C (SME concepts). (orig.)

  9. Bruce A refurbishment - preparatory work completed, major tasks to begin soon

    International Nuclear Information System (INIS)

    Boyd, F.

    2006-01-01

    Over the past year Bruce Power has been planning and organizing for an extensive refurbishment of the Units 1 and 2 of the Bruce A station. Now the company and its several major contractors are ready to proceed with the most challenging aspects of the actual work. The largest tasks are the replacement of the 8 steam generators and of the 480 complete fuel channels in each unit Bruce Power has created a separate website connected to their basic one to provide ongoing information about the progress of the work. The following brief note is intended to provide an outline of this challenging refurbishment program and to invite readers to visit this website to follow its progress. To provide background the writer was accorded an informative and interesting tour of the units by Rob Liddle, of Bruce Power, on September 28, 2006 the day after the ceremony commemorating the Douglas Point station held at the Bruce site. (author)

  10. The Efficacy of Waste Management Plans in Australian Commercial Construction Refurbishment Projects

    Directory of Open Access Journals (Sweden)

    Mary Hardie

    2012-11-01

    Full Text Available Renovation and refurbishment of the existingcommercial building stock is a growing area oftotal construction activity and a significantgenerator of waste sent to landfill in Australia. Awritten waste management plan (WMP is awidespread regulatory requirement forcommercial office redevelopment projects. Thereis little evidence, however, that WMPs actuallyincrease the quantity of waste that is ultimatelydiverted from landfill. Some reports indicate anabsence of any formal verification or monitoringprocess by regulators to assess the efficacy ofthe plans. In order to gauge the extent of theproblem a survey was conducted of twenty fourconsultants and practitioners involved incommercial office building refurbishment projectsto determine the state of current practice withregard to WMPs and to elicit suggestions withregard to ways of making the process moreeffective. Considerable variation in commitmentto recycling policies was encountered indicatinga need to revisit waste minimisation practices ifthe environmental performance of refurbishmentprojects is to be improved.

  11. Systems engineering aspects to installation of the phased multi-year LANSCE-refurbishment project

    International Nuclear Information System (INIS)

    Pieck, Martin; Erickson, John E.; Gulley, Mark S.; Jones, Kevin W.; Rybarcyk, Larry J.

    2009-01-01

    The LANSCE Refurbishment Project (LANSCE-R) is a phased, multiyear project. The project is scheduled to start refurbishment in the 2nd quarter of fiscal year 2011. Closeout will occur during the 4th quarter of FY2016. During the LANSCE-R project, installation of project components must be scheduled during six annual 6-month maintenance-outages and not conflict with annual LANSCE operational commitments to its user facilities. The project and operations schedules must be synchronized carefully. Therefore, the scheduled maintenance outages, functional testing (with beam off, by primarily project personnel) and commissioning (with beam on, by primarily Accelerator Operation Technology (AOT) personnel) must be managed to accommodate operation. Active and effective coordination and communication between the project and AOT personnel must be encouraged to identify, as early as possible, any operational issues. This paper will report on the systems engineering approach to the integration and control of engineering activities.

  12. Fabrication of nano-mosquitocides using chitosan from crab shells: Impact on non-target organisms in the aquatic environment.

    Science.gov (United States)

    Murugan, Kadarkarai; Anitha, Jaganathan; Dinesh, Devakumar; Suresh, Udaiyan; Rajaganesh, Rajapandian; Chandramohan, Balamurugan; Subramaniam, Jayapal; Paulpandi, Manickam; Vadivalagan, Chitravel; Amuthavalli, Pandiyan; Wang, Lan; Hwang, Jiang-Shiou; Wei, Hui; Alsalhi, Mohamad Saleh; Devanesan, Sandhanasamy; Kumar, Suresh; Pugazhendy, Kannaiyan; Higuchi, Akon; Nicoletti, Marcello; Benelli, Giovanni

    2016-10-01

    Mosquitoes are arthropods of huge medical and veterinary relevance, since they vector pathogens and parasites of public health importance, including malaria, dengue and Zika virus. Currently, nanotechnology is considered a potential eco-friendly approach in mosquito control research. We proposed a novel method of biofabrication of silver nanoparticles (AgNP) using chitosan (Ch) from crab shells. Ch-AgNP nanocomposite was characterized by UV-vis spectroscopy, FTIR, SEM, EDX and XRD. Ch-AgNP were tested against larvae and pupae of the malaria vector Anopheles stephensi obtaining LC50 ranging from 3.18 ppm (I) to 6.54 ppm (pupae). The antibacterial properties of Ch-AgNP were proved against Bacillus subtilis, Klebsiella pneumoniae and Salmonella typhi, while no growth inhibition was reported in assays conducted on Proteus vulgaris. Concerning non-target effects, in standard laboratory considtions the predation efficiency of Danio rerio zebrafishes was 68.8% and 61.6% against I and II instar larvae of A. stephensi, respectively. In a Ch-AgNP-contaminated environment, fish predation was boosted to 89.5% and 77.3%, respectively. Quantitative analysis of antioxidant enzymes SOD, CAT and LPO from hepatopancreas of fresh water crabs Paratelphusa hydrodromous exposed for 16 days to a Ch-AgNP-contaminated aquatic environment were conducted. Notably, deleterious effects of Ch-AgNP contaminating aquatic enviroment on the non-target crab P. hydrodromous were observed, particularly when doses higher than 8-10ppm are tested. Overall, this research highlights the potential of Ch-AGNP for the development of newer control tools against young instar populations of malaria mosquitoes, also highlighting some risks concerned the employ of nanoparticles in aquatic environments. Copyright © 2016 Elsevier Inc. All rights reserved.

  13. The Role of Laser Additive Manufacturing Methods of Metals in Repair, Refurbishment and Remanufacturing - Enabling Circular Economy

    Science.gov (United States)

    Leino, Maija; Pekkarinen, Joonas; Soukka, Risto

    Circular economy is an economy model where products, components, and materials are aimed to be kept at their highest utility and value at all times. Repair, refurbishment and remanufacturing processes are procedures aiming at returning the value of the product during its life cycle. Additive manufacturing (AM) is expected to be an enabling technology in circular economy based business models. One of AM process that enables repair, refurbishment and remanufacturing is Directed Energy Deposition. Respectively Powder Bed Fusion enables manufacturing of replacement components on demand. The aim of this study is to identify the current research findings and state of art of utilizing AM in repair, refurbishment and remanufacturing processes of metallic products. The focus is in identifying possibilities of AM in promotion of circular economy and expected environmental benefits based on the found literature. Results of the study indicate significant potential in utilizing AM in repair, refurbishment and remanufacturing activities.

  14. On Stakeholders and the Decision Making Process Concerning Sustainable Renovation and Refurbishment in Sweden, Denmark and Cyprus

    DEFF Research Database (Denmark)

    Gohardani, Navid; Björk, Folke; Jensen, Per Anker

    2013-01-01

    This article examines the decision making process related to sustainable renovation and refurbishment in buildings. The utilized methodology identifies three distinct phases in order to instigate an engagement in sustainable renovation, by means of questionnaires and semi-structured interviews...

  15. Understanding valve program complexity in a refurbishment environment - learning from the past

    International Nuclear Information System (INIS)

    Roth, H.E.

    2012-01-01

    The complexity of Valve Program development, planning, execution and management in a refurbishment environment is an enormous undertaking requiring the proper coordination and integration of many moving parts. As such, lack of attention and understanding of this complexity has led to significant cost and schedule overruns in past refurbishment projects in the province. OPEX indicates the challenges in completing valve scope during refurbishments are related but not limited to; lack of detailed condition assessments, improper scope development, insignificant strategic approach to work task planning, scheduling and procurement, absence of contingency planning for common ‘as found’ conditions during execution, lack of proper training requirements, etc. In addition, past contracting strategies to employ numerous companies in collaboration to complete such a complex and specialized program, has resulted in further complications surrounding the management and integration of multiple quality programs and internal company processes. Finally, the aftermath of such fragmented projects results in an absolute closeout nightmare, often times taking years to locate, sift through and re-integrate pertinent information back into customer systems. Valve Program complexity cannot be understood by just anyone, only those that have lived through a refurbishment project and experienced the challenges mentioned above have the knowledge, skill, and ability to appreciate how to tactically apply past learning to realize future improvements. Furthermore, effective contractor-customer collaboration is crucial; true and in-depth knowledge and understanding of the customer quality programs, engineering and work management processes, configuration management requirements, and most importantly the imperative significance of nuclear safety, are all essential components to ensure overall alignment and program success. (author)

  16. Development of a virtual training simulator for a challenging refurbishment task

    International Nuclear Information System (INIS)

    Mort, P.E.

    1996-01-01

    An overview is presented of the technology, developed by British Nuclear Fuels Limited (BNFL), to create a virtual training simulator for refurbishment tasks. It focuses on the Raffinate Project, a challenging plant modification take, performed remotely, during which component removal, welding and installation of new components are all undertaken. The Training Simulator developed required fast multiprocessor computing with system intercommunication. Operators responded well to the Training Simulator and further improvements to the system are underway. (UK)

  17. Thermal protection and refurbishment of an old building. Lectures; Waermeschutz und Altbausanierung. Vortraege

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    Within the 22nd Hanseatic Reconstruction Symposium at the Baltic Seaside Heringsdorf/Usedom (Federal Republic of Germany) from 3rd to 5th November 2011, the following lectures were held: (1) Energetic refurbishment possibilities for building within existing properties by means of representative examples (F. Deitschum); (2) Constructional thermal insulation and indoor climate - for the good of the environment? (S. Groer); (3) Innovative insulating materials for the structural refurbishment? (O. Fechner); (4) Energetic half-timbering refurbishment (K. Lissner); (5) Wooden solar facades for existing buildings (U. Schwarz); (6) Timber beam bowls in a historic brickwork (U. Mueller); (7) Timber beam bowls and interior insulation (U. Ruisinger); (8) Innovative solutions for cavity filling insulations (A. Stefenelli); (9) Thermal insulating plaster - also for historical buildings (T. Stahl); (10) Experimental tension analysis of the structural behaviour of historical cross vaults (A.-J. Petereit); (10) Investigation of the increase of the flexural strength of stonework constructions with self-compacting steel fibre reinforced concrete (D. Haessler); (11) Dry and dense - the modified WTA leaflet 4-6, 'Subsequent sealing of components in contact with soil' - Content and innovations (R. Spirgatis); (12) What does the new standard DIN 68800 hold? (H. Willeitner); (13) News from the standard DIN 18195 waterproofing of buildings (H.-P. Sommer); (14) Liability of planning of the offering entrepreneur (H. Immoor); (15) Climate change and preservation of structures (W. Zillig); (16) Typical problems and deficiencies of the energetic refurbishment of old store buildings (H. Boehmer); (17) When do ex post horizontal sealings with injection agents make sense - Fundamentals for evaluation, planning and execution (F.-J. Hoelzen); (18) Drying up behaviour of stonework of different quality and at different variants of insulation (F. Antretter).

  18. Refurbishment of the transportation equipment, Task 3.08/04-10

    International Nuclear Information System (INIS)

    Nikolic, M.; Bratic, A.

    1963-01-01

    Transportation equipment at the RA reactor includes the bridge crane in the reactor hall, another smaller crane, bridge crane in spent fuel storage space, crane for handling the fuel containers n the room 099 and cart of the transportation channel. Regular testing and maintenance during reactor operation was not considered sufficient, and for that reason the repair and maintenance actions were done during the refurbishment of the reactor while it has been shut-down

  19. Understanding valve program complexity in a refurbishment environment - learning from the past

    Energy Technology Data Exchange (ETDEWEB)

    Roth, H.E. [Babcock & Wilcox Canada Ltd., Cambridge, Ontario (Canada)

    2012-07-01

    The complexity of Valve Program development, planning, execution and management in a refurbishment environment is an enormous undertaking requiring the proper coordination and integration of many moving parts. As such, lack of attention and understanding of this complexity has led to significant cost and schedule overruns in past refurbishment projects in the province. OPEX indicates the challenges in completing valve scope during refurbishments are related but not limited to; lack of detailed condition assessments, improper scope development, insignificant strategic approach to work task planning, scheduling and procurement, absence of contingency planning for common ‘as found’ conditions during execution, lack of proper training requirements, etc. In addition, past contracting strategies to employ numerous companies in collaboration to complete such a complex and specialized program, has resulted in further complications surrounding the management and integration of multiple quality programs and internal company processes. Finally, the aftermath of such fragmented projects results in an absolute closeout nightmare, often times taking years to locate, sift through and re-integrate pertinent information back into customer systems. Valve Program complexity cannot be understood by just anyone, only those that have lived through a refurbishment project and experienced the challenges mentioned above have the knowledge, skill, and ability to appreciate how to tactically apply past learning to realize future improvements. Furthermore, effective contractor-customer collaboration is crucial; true and in-depth knowledge and understanding of the customer quality programs, engineering and work management processes, configuration management requirements, and most importantly the imperative significance of nuclear safety, are all essential components to ensure overall alignment and program success. (author)

  20. Experience feedback on the refurbishment of the LECA hot laboratory at Cadarache

    International Nuclear Information System (INIS)

    Grandjean, Jean-Paul; Autran, Bernard; Blanc, Jean-Yves

    2007-01-01

    Full text: After ten years of renovation work, the LECA hot laboratory refurbishment project has finally been completed which means it is now time to draw a few conclusions. Refurbishment of LECA was needed to enable PIE in this laboratory up to 2015. Improvements were made according to the laboratory safety assessment in March 2001. More than 400,000 working hours were clocked up without any serious accidents. The overall radiological record remained below 0.4 man.Sv for this period despite a high contamination level in the venting system and hot cells. The total fissile mass was decreased by a factor of three, and contamination was also considerably reduced. The project was finalised two years later than expected, mainly due to difficulties with two contracts on civil engineering work to improve seismic resistance and on inserting stainless steel casing into some hot cells. Renovation work on existing structures was underestimated, as was the time required to re-commission the cells. The fact that the total number of external staff working inside the facility at the same time was limited also slowed work down. This delay affected the research programmes mainly over the last two years. On the whole, 85 % of all experimentation activities were nevertheless continued during refurbishment. New steps for refurbishment have already been planned so as to extend the LECA service life once again. A line of lead-shielded cells - not designed to withstand current earthquake standards - will be demolished before the end of 2008, and civil engineering operations have been programmed for 2013-2014 so the facility will be able to withstand a maximum design earthquake. (authors)

  1. Application of the ALARP principle to a major refurbishment project at Sellafield

    International Nuclear Information System (INIS)

    Hendrickson, W.R.; Coates, R.

    1989-01-01

    A formalised structured approach to the ALARP principle has been developed and is being applied to occupational radiation exposure on a major refurbishment project at Sellafield. The processes consider the conceptual and subsequent detailed design stages, planning and operational control and incorporates a dose feedback and review system. The approach has led to significant dose savings so far on the project, with recorded doses being significantly less than the doses estimated at the preliminary assessment stage. (author)

  2. Refurbishment of BR2 (Phase 4 and 5)[1997 Scientific Report of the Belgian Nuclear Research Centre

    Energy Technology Data Exchange (ETDEWEB)

    Gubel, P.; Dekeyser, J.; Van der Auwera, J.

    1998-07-01

    The extensive refurbishment of the BR-2 materials testing reactor should allow another 10 to 15years of continued operation. The refurbishment programme is required in order to comply with modern safety standards, to enhance the reliability of operation, and to compensate for the ageing of the installations of a facility that has reached about 35 years of intensive service. The main objectives and achievements of phase 4 and 5 are described.

  3. Effect of dopants and thermal treatment on properties of Ga-Al-ZnO thin films fabricated by hetero targets sputtering system

    International Nuclear Information System (INIS)

    Hong, JeongSoo; Matsushita, Nobuhiro; Kim, KyungHwan

    2013-01-01

    In this study, we fabricated Ga and Al doped ZnO (Ga-Al-ZnO; GAZO) thin films by using the facing targets sputtering system under various conditions such as input current and thermal treatment temperature. The properties of the as-deposited GAZO thin films were examined by four-point, UV/Vis spectrometry, X-ray diffraction, atomic force microscopy and field-emission scanning electron microscopy. The result showed that the lowest sheet resistance of the films was 59.3 ohm/sq and transmittance was about 85%. After thermal treatment, the properties of GAZO thin films were improved. The lowest sheet resistance (47.3 ohm/sq) of the GAZO thin films were obtained at thermal treatment temperature of 300 °C, considered to be the result of continuous substitutions by dopants and improved crystallinity by the thermal treatment. - Highlights: ► Ga and Al doped ZnO thin films were prepared by hetero targets sputtering system. ► Free electrons were increased due to the continuous substitutions of Ga and Al. ► Crystallinity was improved by recombination of particles with increasing of temperature

  4. Fabrication and application of a magnetic-targeting and controlled-release system using ST68-based microbubbles

    International Nuclear Information System (INIS)

    Xing Zhanwen; Ke Hengte; Wang Jinrui; Zhao Bo; Qu Enze; Yue Xiuli; Dai Zhifei

    2013-01-01

    Objective: To manufacture magnetic microbubbles with dual-response to ultrasound and magnetic fields. Methods: Microbubbles of ultrasound contrast agent (ST68) based on a surfactant were prepared by the acoustic cavitation method. Fe 3 O 4 magnetic nanoparticles with negative charge were synthesized using the polyol procedure. Magnetic microbubbles were generated by depositing polyethylenimine and Fe 3 O 4 magnetic nanoparticles alternately onto the microbubbles using the layer-by-layer self-assembly. In vitro ultrasonography was performed on a silicone tube with/without magnetic microbubbles (3 × 10 8 /ml) by a self-made device to observe the movement of magnetic microbubbles under the effects of magnetic field. In vivo imaging was performed on the kidney of New Zealand rabbits before and after the injection of magnetic microbubbles. Results: The Fe 3 O 4 nanoparticles carried a stable negative charge of (-24.6 ± 6.7) mV and more than 98% of the particles were less than 8 μm in diameter, meeting the size requirement of an ultrasound contrast agent for intravenous administration. There was no echoic signal in the silicone tube before injection of magnetic microbubbles, but there were strong echoic signals after injection. After applying a magnetic field, the magnetic microbubbles moved along the direction of the magnetic flux. In vivo ultrasound imaging could not visualize the kidney before injection of magnetic microbubbles, but could remarkably visualize the kidney after injection. Conclusions: The magnetic microbubbles exhibit favorable magnetic targeting and ultrasound contrast enhancement characteristics. Such properties may serve as the foundation to study their potential for simultaneous diagnosis and treatment in the future. (authors)

  5. Project Experiences in Research Reactor Ageing Management, Modernization and Refurbishment. Report of a Technical Meeting on Research Reactor Ageing Management, Modernization and Refurbishment

    International Nuclear Information System (INIS)

    2014-08-01

    Research reactors have played an important role in several scientific fields for around 60 years: in the development of nuclear science and technology; in the valuable generation of radioisotopes for various applications; and in the development of human resources and skills. Moreover, research reactors have been effectively utilized to support sustainable development in more than 60 countries worldwide. More than half of all operating research reactors are now over 40 years old, with many exceeding their originally conceived design life. The majority of operating research reactors face challenges due to the negative impacts of component and system ageing, which manifest in a number of forms. This situation was highlighted by a serious medical isotope supply crisis which peaked in mid-2010, when several major producing reactors underwent prolonged shutdowns due to extensive necessary overhauls of various systems. Several facilities have established a proactive systematic approach to managing ageing or mitigating its impact on safety and availability of isotopes. Others have tried to prevent or remedy the drawbacks of ageing on a case by case basis. Overall, a large body of knowledge related to ageing issues exists in many Member States. Collecting and sharing this information within the research reactor community can provide a solid foundation to develop a more systematic approach — that is, an ageing management programme to prevent negative consequences of ageing on the safety, and the operability and lifetime of operating, or even future, reactors. It may also help organizations to manage research reactors that have been in an extended shutdown state by ensuring that any required systems are operated and maintained in a safe manner prior to final decommissioning and disposal of fuel to safe storage facilities. Sharing experiences from projects undertaken to refurbish or replace equipment and systems, satisfy safety and regulatory requirements, improve

  6. Project Experiences in Research Reactor Ageing Management, Modernization and Refurbishment. Report of a Technical Meeting on Research Reactor Ageing Management, Modernization and Refurbishment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-08-15

    Research reactors have played an important role in several scientific fields for around 60 years: in the development of nuclear science and technology; in the valuable generation of radioisotopes for various applications; and in the development of human resources and skills. Moreover, research reactors have been effectively utilized to support sustainable development in more than 60 countries worldwide. More than half of all operating research reactors are now over 40 years old, with many exceeding their originally conceived design life. The majority of operating research reactors face challenges due to the negative impacts of component and system ageing, which manifest in a number of forms. This situation was highlighted by a serious medical isotope supply crisis which peaked in mid-2010, when several major producing reactors underwent prolonged shutdowns due to extensive necessary overhauls of various systems. Several facilities have established a proactive systematic approach to managing ageing or mitigating its impact on safety and availability of isotopes. Others have tried to prevent or remedy the drawbacks of ageing on a case by case basis. Overall, a large body of knowledge related to ageing issues exists in many Member States. Collecting and sharing this information within the research reactor community can provide a solid foundation to develop a more systematic approach — that is, an ageing management programme to prevent negative consequences of ageing on the safety, and the operability and lifetime of operating, or even future, reactors. It may also help organizations to manage research reactors that have been in an extended shutdown state by ensuring that any required systems are operated and maintained in a safe manner prior to final decommissioning and disposal of fuel to safe storage facilities. Sharing experiences from projects undertaken to refurbish or replace equipment and systems, satisfy safety and regulatory requirements, improve

  7. High-Rise Refurbishment: The Energy-Efficient Upgrade of Multi-Story Residences in the European Union

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    Some 36 million European households are in high-rise residences, one in six of all households, and yet many of the buildings are in urgent need of refurbishment. This study, which is one in a series being conducted on behalf of the International Energy Agency addressing the energy performance of the existing IEA-wide building stock, identifies a Europe-wide cost-effective energy saving potential of 28% from energy-efficient refurbishment of the high-rise residential building stock. Attainment of this potential would imply a 1.5% reduction of Europe's total final energy demand and annual CO2 emissions savings of 35 Mt. In practice only the less efficient buildings need to be refurbished to realise these stockaverage savings and for these buildings typical savings in heating energy from refurbishment of between 70 and 80% are identified. Buildings in general suffer from a variety of barriers that tend to prevent their occupants from maintaining and refurbishing them to levels of comfort and energy performance that would be justified over the longer term, but collective housing in general is particularly susceptible to market failures. Many occupants do not own the property while their landlords usually have little motivation to finance improvements. Refurbishment requires collective agreement on a capital investment, which is difficult to establish especially when some occupants expect to live in the building over the longer-term but others only for the short-term. Furthermore, in most cases the occupants of high-rise residences are not among the wealthier members of society and they find it difficult to raise capital for longer-term investments. It is not surprising, then, to find that this section of the building stock is the most neglected and that there remain significant cost-effective opportunities for it to be refurbished in a way that improves comfort, saves energy, reduces CO2 emissions and significantly improves the urban environment.

  8. Refurbishment and Automation of the Thermal/Vacuum Facilities at the Goddard Space Flight Center

    Science.gov (United States)

    Donohue, John T.; Johnson, Chris; Ogden, Rick; Sushon, Janet

    1998-01-01

    The thermal/vacuum facilities located at the Goddard Space Flight Center (GSFC) have supported both manned and unmanned space flight since the 1960s. Of the 11 facilities, currently 10 of the systems are scheduled for refurbishment and/or replacement as part of a 5-year implementation. Expected return on investment includes the reduction in test schedules, improvements in the safety of facility operations, reduction in the complexity of a test and the reduction in personnel support required for a test. Additionally, GSFC will become a global resource renowned for expertise in thermal engineering, mechanical engineering and for the automation of thermal/vacuum facilities and thermal/vacuum tests. Automation of the thermal/vacuum facilities includes the utilization of Programmable Logic Controllers (PLCs) and the use of Supervisory Control and Data Acquisition (SCADA) systems. These components allow the computer control and automation of mechanical components such as valves and pumps. In some cases, the chamber and chamber shroud require complete replacement while others require only mechanical component retrofit or replacement. The project of refurbishment and automation began in 1996 and has resulted in the computer control of one Facility (Facility #225) and the integration of electronically controlled devices and PLCs within several other facilities. Facility 225 has been successfully controlled by PLC and SCADA for over one year. Insignificant anomalies have occurred and were resolved with minimal impact to testing and operations. The amount of work remaining to be performed will occur over the next four to five years. Fiscal year 1998 includes the complete refurbishment of one facility, computer control of the thermal systems in two facilities, implementation of SCADA and PLC systems to support multiple facilities and the implementation of a Database server to allow efficient test management and data analysis.

  9. Densifying the city: urban recycle as a strategic system to refurbish the built environment

    Directory of Open Access Journals (Sweden)

    Vittorino Belpoliti

    2015-11-01

    Full Text Available The persisting economic crisis and the necessity for more sustainable construction processes imply the need for innovative strategies to reuse the existing building stock. Retrofit and recycling plans are already active for whole city districts, adopting the urban densification strategy to reduce the consumption of resources, promoting the functional, technological, and energy refurbishment of the existing city districts The study introduces considerations and tools to increase the efficiency of retrofit action onto abandoned and degraded area through the improvement of their energy and environmental performances. 

  10. Motier church - refurbishment of heating system; Kirche Motier Sanierung der Raumheizung

    Energy Technology Data Exchange (ETDEWEB)

    Grizzetti, V.

    2003-07-01

    This final report for the Swiss Federal Office for Energy describes the refurbishment of the space heating system of the historical church in Motier, Switzerland. The 50-year old, inefficient electrical direct heating system of the church, which is a listed building, and the new, heat pump-based system are described. Heating energy is distributed via a warm-air system, geothermal energy provides the primary heat source for the heat pump. Technical details of the heating characteristics and energy consumption of the old and new heating systems are presented in the form of tables and diagrams. The maintenance of the heating system's ventilation unit is also discussed.

  11. Refurbishment of damaged tools using the combination of GTAW and laser beam welding

    Directory of Open Access Journals (Sweden)

    J. Tušek

    2014-10-01

    Full Text Available This paper presents the use of two welding processes for the refurbishment of damaged industrial tools. In the first part the problem is presented followed by the comparison of GTAW and laser welding in terms of repair welding of damaged tools. The macrosections of the welds show the difference between both welding processes in repairing of damaged tools. At the conclusion the main findings are presented. In many cases it is useful to use both welding processes in order to achieve better weld quality and to make welding more economical. The order of the technology used depends on the tool material, the use of the tool and the tool damage.

  12. Applying a CPLD for Refurbishment of a Multi-channel Pulse Height Analyzer

    International Nuclear Information System (INIS)

    Leetragunpichitchai, Supalerk; Thong-Aram, Decho; Ploykrachang, Kamontip

    2007-08-01

    Full text: This research applied a CPLD for construction of a 100 MHz, 2048 channel, Wilkinson type analog to digital converter (ADC) circuits for refurbishment of an original multi-channel pulse height analyzer (PHA) ADC. Introduction of the CPLD could reduce the complexity of the circuits, equipment size and also the power consumption while the operation speed was increased. The linearity test of the ADC was found to be excellent with an R2 = 0.9995 and a maximum pulse rate of 48.828 k cps could be converted in this system. Therefore the developed system was appropriate for replacing the original ADC

  13. Refurbishment of small hydropower plants in Romania; Sanierung von Kleinwasserkraftwerken in Rumaenien

    Energy Technology Data Exchange (ETDEWEB)

    Gmeinbauer, Joerg [Wien Energie GmbH, Wien (Austria)

    2010-07-01

    In 2008 Wien Energie subsidiary Wienstrom GmbH participated in three public auctions of Hidroelectrica S.A. for the sale of old small hydro power plants in Romania. Together with strategic partners Wienstrom could successfully compete against local and international competition and acquired 31 small hydro power plants with a total installed capacity of around 20 MW. The plants were integrated into the newly established Vienna Energy Forta Naturala Srl. and are being completely refurbished at the moment. Wien Energie consequently is already the third largest operator of small hydro power plants in Romania. (orig.)

  14. Fabricated Elastin.

    Science.gov (United States)

    Yeo, Giselle C; Aghaei-Ghareh-Bolagh, Behnaz; Brackenreg, Edwin P; Hiob, Matti A; Lee, Pearl; Weiss, Anthony S

    2015-11-18

    The mechanical stability, elasticity, inherent bioactivity, and self-assembly properties of elastin make it a highly attractive candidate for the fabrication of versatile biomaterials. The ability to engineer specific peptide sequences derived from elastin allows the precise control of these physicochemical and organizational characteristics, and further broadens the diversity of elastin-based applications. Elastin and elastin-like peptides can also be modified or blended with other natural or synthetic moieties, including peptides, proteins, polysaccharides, and polymers, to augment existing capabilities or confer additional architectural and biofunctional features to compositionally pure materials. Elastin and elastin-based composites have been subjected to diverse fabrication processes, including heating, electrospinning, wet spinning, solvent casting, freeze-drying, and cross-linking, for the manufacture of particles, fibers, gels, tubes, sheets and films. The resulting materials can be tailored to possess specific strength, elasticity, morphology, topography, porosity, wettability, surface charge, and bioactivity. This extraordinary tunability of elastin-based constructs enables their use in a range of biomedical and tissue engineering applications such as targeted drug delivery, cell encapsulation, vascular repair, nerve regeneration, wound healing, and dermal, cartilage, bone, and dental replacement. © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  15. The effectiveness of environment assessment tools to guide refurbishment of Australian residential aged care facilities: A systematic review.

    Science.gov (United States)

    Neylon, Samantha; Bulsara, Caroline; Hill, Anne-Marie

    2017-06-01

    To determine applicability of environment assessment tools in guiding minor refurbishments of Australian residential aged care facilities. Studies conducted in residential aged care settings using assessment tools which address the physical environment were eligible for inclusion in a systematic review. Given these studies are limited, tools which have not yet been utilised in research settings were also included. Tools were analysed using a critical appraisal screen. Forty-three publications met the inclusion criteria. Ten environment assessment tools were identified, of which four addressed all seven minor refurbishment domains of lighting, colour and contrast, sound, flooring, furniture, signage and way finding. Only one had undergone reliability and validity testing. There are four tools which may be suitable to use for minor refurbishment of Australian residential aged care facilities. Data on their reliability, validity and quality are limited. © 2017 AJA Inc.

  16. Refurbishment and Automation of Thermal Vacuum Facilities at NASA/GSFC

    Science.gov (United States)

    Dunn, Jamie; Gomez, Carlos; Donohue, John; Johnson, Chris; Palmer, John; Sushon, Janet

    1999-01-01

    The thermal vacuum facilities located at the Goddard Space Flight Center (GSFC) have supported both manned and unmanned space flight since the 1960s. Of the eleven facilities, currently ten of the systems are scheduled for refurbishment or replacement as part of a five-year implementation. Expected return on investment includes the reduction in test schedules, improvements in safety of facility operations, and reduction in the personnel support required for a test. Additionally, GSFC will become a global resource renowned for expertise in thermal engineering, mechanical engineering, and for the automation of thermal vacuum facilities and tests. Automation of the thermal vacuum facilities includes the utilization of Programmable Logic Controllers (PLCs), the use of Supervisory Control and Data Acquisition (SCADA) systems, and the development of a centralized Test Data Management System. These components allow the computer control and automation of mechanical components such as valves and pumps. The project of refurbishment and automation began in 1996 and has resulted in complete computer control of one facility (Facility 281), and the integration of electronically controlled devices and PLCs in multiple others.

  17. Recent advances in the utilization and the irradiation technology of the refurbished BR2 reactor

    International Nuclear Information System (INIS)

    Dekeyser, J.; Benoit, P.; Decloedt, C.; Pouleur, Y.; Verwimp, A.; Weber, M.; Vankeerberghen, M.; Ponsard, B.

    1999-01-01

    Operation and utilization of the materials testing reactor BR2 at the Belgian Nuclear Research Centre (SCK·CEN) has since its start in 1963 always followed closely the needs and developments of nuclear technology. In particular, a multitude of irradiation experiments have been carried out for most types of nuclear power reactors, existing or under design. Since the early 1990s and increased focus was directed towards more specific irradiation testing needs for light water reactor fuels and materials, although other areas of utilization continued as well (e.g. fusion reactor materials, safety research, ...), including also the growing activities of radioisotope production and silicon doping. An important milestone was the decision in 1994 to implement a comprehensive refurbishment programme for the BR2 reactor and plant installations. The scope of this programme comprised very substantial studies and hardware interventions, which have been completed in early 1997 within planning and budget. Directly connected to this strategic decision for reactor refurbishment was the reinforcement of our efforts to requalify and upgrade the existing irradiation facilities and to develop advanced devices in BR2 to support emerging programs in the following fields: - LWR pressure vessel steel, - LWR irradiation assisted stress corrosion cracking (IASCC), - reliability and safety of high-burnup LWR fuel, - fusion reactor materials and blanket components, - fast neutron reactor fuels and actinide burning, - extension and diversification of radioisotope production. The paper highlights these advances in the areas of BR2 utilisation and the ongoing development activities for the required new generation of irradiations devices. (author)

  18. Refurbishment of the rotating rack of the OSU TRIGA MKII reactor

    International Nuclear Information System (INIS)

    Higginbotham, J.F.; Dodd, B.; Pratt, D.S.; Anderson, T.V.

    1992-01-01

    Many TRIGA reactors have experienced operational difficulties with the rotating racks used for sample irradiation. Generally the rack gradually becomes more difficult to rotate until it finally seizes. The recommended action at that point is replacement of the entire facility at a significant cost. The purpose of this paper is to describe the symptoms leading to rack failure and to present the results of a refurbishment procedure that does not involve the use of solvents which create mixed chemical and radioactive hazardous waste. The primary reason for rack failure is the buildup of sludge produced through irradiation of lubrication oil. The refurbishment procedure involves using a commercially available degreasing solution which can be pumped into and out of the rack with the objective of removing this sludge. The solution used is sold under the trade name 'Simple Green'. No radioactive material was detected on smear or air samples taken of the work area during the reifurbishment activities and the rack rotates freely in both direction even after eighteen months of operation. The only disadvantage to performing this procedure has been the need to maintain a very aggressive contamination control program when unloading samples from the rack. A very fine particulate material attaches to the outside of tubes used to encapsulate samples. This material can produce contamination levels of 10,000 dpm/100 cm 2 in the worst cases but will typically produce local hot spots on the order of 1000 dpm. (author)

  19. The Prevelence of SBS and Absenteeism among Children in Urban Refurbished Private Preshools

    Directory of Open Access Journals (Sweden)

    Salleh Naziah Muhamad

    2016-01-01

    Full Text Available The preschool education is compulsory to children in Malaysia. This regulation has encouraged more premises to be refurbished as a pre-school building. This paper examines the pupils’ absenteeism and the prevalence of Sick Building Symptoms (SBS initiated in congested private preschool with different ventilation strategies. The study analysed data from the attendance record of 10 classrooms and the questionnaire surveys administered to 151 parents about their children health symptoms once they were leaving the schools building. Questions on SBS used 5-point likert scale with symptoms concern on nose, eye, head, throat, skin, breath and tiredness. The descriptive and chi-square test applied to obtain the association of SBS and ventilation strategies in the classrooms. With quantitative and qualitative explanation, the unhealthy environment in refurbished pre-schools explained. Running nose, coughing and sore throat frequently reported in air-conditioning (AC classrooms. The higher absent rate found in AC classrooms. These symptoms show there were weaknesses in ventilation performance and environment in the selected preschools. Further analyses on objective measurements in future research are strongly recommended.

  20. Exposure management in a hot-cell decontamination and refurbishment campaign

    International Nuclear Information System (INIS)

    Courtney, J.C.; Ferguson, K.R.; Chesnovar, D.L.; Huebner, M.F.

    1984-01-01

    We developed a minicomputer-based system to provide rapid access to personnel dosimetry data during a campaign to decontaminate and refurbish a hot-cell at the Hot Fuel Examination Facility (HFEF) Complex. This system allows project management to estimate doses for future tasks, assess the effectiveness of decontamination and personnel protection techniques, and balance exposures among members of various skill groups. As the campaign progresses, projected total exposures can be minimized by tradeoffs between estimated doses during decontamination and estimated dose savings during the refurbishment phase. The effectiveness of various dose-reduction procedures can be compared on the basis of data from a few cell entries before more extensive routine operations are scheduled. Because the radiation fields vary significantly with location in the cell, we find that measurements of whole-body, skin, and extremity doses are more valuable than dose-rate information. Penetrating and skin radiation doses to personnel can be compared to administrative guidelines. This helps us to select the most effective combination of protective clothing. For example, leaded gauntlets reduce the dose rate to the workers' hands, but their use can increase the time required for some in-cell tasks. Hence, use of gauntlets can lead to higher whole-body and skin doses. The program is written for the HFEF Complex Harris/6 minimainframe computer with a disk-monitor operating system

  1. Fatigue load considerations and use of high efficiency materials in the nuclear refurbishment projects: a structural engineering perspective

    Energy Technology Data Exchange (ETDEWEB)

    Mohee, F. M., E-mail: fmm_p@yahoo.com [Univ. of Waterloo, ON (Canada)

    2014-07-01

    For the Darlington refurbishment project in Canada, fatigue load consideration is a very crucial component in the analysis and design of different structures in the nuclear facilities. New and innovative structural materials having much higher ultimate tensile strength and modulus of elasticity, that are free from corrosion, should be considered along with fatigue load during the analysis and design of the nuclear refurbishment projects. The structural analysis should include beam, column and slabs, vibrating, rotating and crane supporting structures, robotic structures, pipe supports, Serapid chain and associated automated gate structures, flask supporting structures, processing unit and lidding unit support structures. (author)

  2. Refurbishment and modification of existing protective shipping packages (for 30-inch UF{sub 6} cylinders) per USDOT specification No. USA-DOT-21PF-1A

    Energy Technology Data Exchange (ETDEWEB)

    Housholder, W.R. [Nuclear Containers, Incorporated, Elizabethton, TN (United States)

    1991-12-31

    This paper addresses the refurbishment procedures for existing shipping containers for 30-inch diameter UF{sub 6} cylinders in accordance with DOT Specification 21PF-1 and the criteria used to determine rejection when such packages are unsuitable for refurbishment.

  3. Fabrication Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — The Fabrication Facilities are a direct result of years of testing support. Through years of experience, the three fabrication facilities (Fort Hood, Fort Lewis, and...

  4. Refurbishment of the gas system, Task 3.08/04-07; Podzadatak 3.08/04-07 Remont sistema gasa

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M; Bratic, A [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During the period planned for maintenance and refurbishment of the RA reactor gas system in the RA reactor building was inspected and tested, the components were cleaned and decontaminated. This report describes detailed instructions and actions concerning repair and decontamination of the gas system components.

  5. Current status of operation, utilization and refurbishment of the Dalat nuclear research reactor

    International Nuclear Information System (INIS)

    Pham Duy Hien.

    1993-01-01

    The reconstructed nuclear research reactor at Dalat, Vietnam has been put into operation since March 1984. Up to present a cumulative operation time of 13,172 hrs at nominal power (500 kW) has been recorded. Production of radioisotopes for medical uses, element analysis by using activation techniques, as well as fundamental and applied research with filtered neutrons are the main activities of reactor utilizations. The problems facing Dalat Nuclear Research Institute are the ageing of the re-used TRIGA-MARK-II reactor components (especially the corrosion of the reactor tank), as well as the obsolescence of many equipment and components of the reactor control and instrumentation system. Refurbishment works are being in process with the technical and financial supports from the Vietnam government and the IAEA. (author). 7 refs, 2 tabs, 10 figs

  6. Case study of a not-so-ordinary building - the Cowra Shire administration building ESD refurbishment

    Energy Technology Data Exchange (ETDEWEB)

    Halperin, M.; Arch, B. [Mahalath Halperin Architects Pty Ltd., Armidale (Australia). RAIA Country Division

    2004-07-01

    In refurbishing the Cowra Administration Building, Mahalath Halperin Architects transformed a concrete and glass building of the 1960s into an energy efficient and environmentally responsible building, yet looks to all intents and purposes like an 'ordinary building'. To some, it is simply a newer, nicer building with bright colours, open spaces and a pleasant work environment. But whilst not necessarily being outwardly different in issues of being a 'green building', the resultant building shows that there are many small yet easily achievable ways to be green. That it is not hard, and is in fact beneficial, to reduce energy consumption and overheads, take advantage of the sun (despite its poor orientation) and take on environmental responsibility. (orig.)

  7. Refurbishment implications on long-term waste management strategies at Point Lepreau

    International Nuclear Information System (INIS)

    Hickman, C.

    2011-01-01

    This paper discusses Point Lepreau Generating Station's waste management experiences during the Refurbishment outage. In short, Point Lepreau GS has been challenged during the outage due to the amount of low and intermediate level waste that has been generated compared to that which was expected, which has driven the need to develop a new waste management strategy in the middle of the outage. The paper presents an overview of pre-outage waste handling, what process changes and schedule changes occurred during the outage, and provides a discussion of the operational and financial consequences of those changes. Key issues highlighted by the paper include the need for adequate provision of waste management facilities during large outages, the importance of ensuring that contractors have a stake in waste minimization activities, and long term waste management implications that need to be considered for large outages.

  8. Start-up of Cirus after refurbishment outage and observations during approach to criticality

    International Nuclear Information System (INIS)

    Singh, Tej; Singh, Kanchhi; Sengupta, S.N.

    2004-10-01

    The report presents various physics related aspects of the startup of Cirus reactor after the prolonged refurbishment outage. The special nuclear instrumentation scheme adopted to ensure safe startup of the reactor is described. Salient observations made and physics measurements carried out during various approaches to criticality are covered. One of the significant observations concerned a major reactivity anomaly during the approach to criticality. After due investigations the cause of the anomaly was attributed to the inadvertent wetting of the graphite reflector which houses the reactor regulating and protection system ion chambers. The report also includes salient observations during raising of reactor power to high levels. The wet reflector also resulted in a significant difference measured between the thermal and neutronic power of the reactor. In view of the reactivity anomaly, the core reactivity variation with time was closely followed and compared with computations. As expected the reactivity anomaly reduced gradually with time. (author)

  9. Main refurbishment activities on electronic and electrical equipment for the FRG-1 research reactor

    International Nuclear Information System (INIS)

    Blom, K.H.; Krull, W.

    1997-01-01

    As GKSS intends to operate the research reactor FRG-1 safely and reliably for many years to come, the plant is constantly refurbished and upgraded both in the interests of safety and operational reasons. The following electronic and electrical systems have been replaced or improved since 1990: Information and signalling systems; Emergency power plant (permit applied for); External and internal lightning protection system; Reactor protection system (in part); Safety lighting; Alarm and staff locating system; Control room telephone system; Closed-circuit television system; Beam tube controls; Storage plant for radioactive liquid waste; Ambient dose rate measuring system; Meteorological measuring system; Control and measuring system for the primary cooling circuit; Control rod drives; Control rod control system; Soft start for the secondary pumps; Control and switching devices for the emergency power plant; Trailing cable installation for the reactor bridge; Main-voltage distribution systems/cable routes. (author). 13 figs, 1 tab

  10. Scout house in Koeniz - Refurbishment of the heating system; Pfadiheim Weiermatt, Sanierung Waermeversorgung - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Messerli, A. [Neuenschwander - Neutair AG, Berne (Switzerland); Jenni, H. [Heimverein Falkenstein, Koeniz (Switzerland)

    2004-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results of a project carried out in Koeniz, Switzerland. The report examines how the energy situation at the local scout house was improved. The work included the refurbishment of the heating system using solar collectors, intelligently controlled heat pumps, a photovoltaics installation and even solar-powered street lighting. The project, which received a substantial echo from the general public, is described. The scouts were directly involved in the project and, in part, in the construction work. This, according to the authors, enhanced the educational aspect of the project. The report presents details on the various installations and is illustrated with schematics and photos. Also, the results of monitoring and measurements made are presented.

  11. Status of FRJ-2 refurbishment of tank pipes and essential results of aging analysis

    International Nuclear Information System (INIS)

    Hansen, G.; Thamm, G.; Thome, M.

    1993-01-01

    An aging evaluation program for FRJ-2 (DIDO) of the Forschungszentrum Juelich GmbH has been developed and is currently executed in cooperation with the licensing and regulatory and TUV experts in order to determine the overall life expectancy of the facility and to identify critical systems and components that need to be upgraded or refurbished for future safe reactor operation. In Phase A (completed) a so called master list of the FRJ-2 mechanical, electrical and structural components was compiled on a system-by system basis and the operational documentation with respect to regular inspections, maintenance, repair and unusual occurences was carefully examined. Critical components were selected and their ageing respectively life limiting mechanisms identified. In Phase (currently under way) special inspections, examinations and tests for critical systems/components are being elaborated, executed and evaluated. Current work is being concentrated on non replaceable components (e.g. reactor aluminium tank (RAT) and the connecting pipes to the primary cooling circuit, the reactor steel tank and pipe work inside the concrete reactor block). As a consequence of first results of the aging evaluation program and due to leaks in the weir and drain pipes of the RAT a repair/refurbishment program was set up for the Al-RAT pipes (risers, downcomers weir and drain pipes) and the steel guide tubes. Details of the r/r program which is in far progress and first essential results of the aging evaluation will be presented. The results achieved until today are encouraging with respect to safe reactor operation on short and medium term. (author)

  12. Status of FRJ-2 Refurbishment of tank pipes and essential results of aging analysis

    International Nuclear Information System (INIS)

    Hansen, G.; Thamm, G.; Thome, M.

    1994-01-01

    An aging evaluation program for FRJ-2 (DIDO) of the Forschungszentrum Juelich GmbH has been developed and is currently executed in cooperation with the licensing and regulatory and TUEV experts in order to determine the overall life expectancy of the facility and to identify critical systems and components that need to be upgraded or refurbished for future safe reactor operation. In Phase A (completed) a so called master list of the FRJ-2 mechanical, electrical and structural components was compiled on a system-by system basis and the operational documentation with respect to regular inspections, maintenance, repair and unusual occurrences was carefully examined. Critical components were selected and their ageing respectively life limiting mechanisms identified. In Phase B (currently under way) special inspections, examinations and tests for critical systems/components are being elaborated, executed and evaluated. Current work is being concentrated on non replaceable components (e.g. reactor aluminium tank (RAT) and the connecting pipes to the primary cooling circuit, the reactor steel tank and pipe work inside the concrete reactor block). As a consequence of first results of the aging evaluation program and due to leaks in the weir and drain pipes of the RAT a repair/refurbishment program was set up for the Al-RAT pipes (risers, downcomers, weir and drain pipes) and the steel guide tubes. Details of the r/r program which is in far progress and first essential results of the aging evaluation will be presented. The results achieved until today are encouraging with respect to safe reactor operation on short and medium term. (J.P.N.)

  13. Choosing the Energy Sources Needed for Utilities in the Design and Refurbishment of Buildings

    Directory of Open Access Journals (Sweden)

    Pavel Atănăsoae

    2018-03-01

    Full Text Available This paper presents a method for choosing the energy sources that are needed for the following building utilities following building: lighting, domestic hot water, heating, ventilation, and air conditioning. The novelty of this paper consists of applying the concept of the energy hub and considering the cost of carbon dioxide emissions when selecting the available energy sources in the building’s location. The criterion for selecting the energy sources is the minimum overall cost of all forms of energy that are consumed in the building over its estimated lifetime. In order to estimate the overall costs, it is necessary to know the power that is installed and provided by the energy production technologies that are inside the building, as well as the capacity of energy that is required from outside energy sources. An office building that was proposed for refurbishment has been investigated as a case study. In the paper, we have analysed four scenarios. The results indicate that more favourable alternative solutions can be obtained compared to the traditional scenario (Scenario 4—heat and electricity by public utility networks. The overall costs are 46.17% (212,671 EUR lower in Scenario 1, 25.35% (116,770 EUR lower in Scenario 2, and 10.89% (50,150 EUR lower in Scenario 3. Additionally, the carbon dioxide emissions are 22.98% (49 tonnes CO2/year lower in Scenario 1 and 8.91% (19 tonnes CO2/year lower in Scenario 2. Thus, renewable energy sources can occupy a growing share of the total energy consumption of the building. The proposed algorithm can be used for both the refurbishment of existing buildings and the design of new buildings.

  14. A containment analysis for SBLOCA in the refurbished Wolsong-1 Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kim, Tech-Mo; Park, Jong-Ho

    2011-01-01

    Highlights: → The CANDU safety analysis has been accomplished for the refurbished Wolsong-1 NPP. → GOTHIC and SMART-IST codes and new methodology are used for the containment analysis. → The parametric studies for Iodine Chemistry (IMOD-2) model are performed. → And, IMOD-2 model is very sensitive to paint thickness and dousing water pH. → The radioactive doses to the public in SBLOCA event are far below the acceptable limits. - Abstract: A small break leading to a loss of coolant accident (SBLOCA), being one of the topic accidents in the nuclear plant diagnosis in recent years, has been analysed and evaluated for the refurbished Wolsong-1 Nuclear Power Plant (NPP). The Industry Standard Toolset (IST) codes developed by CANDU (Canadian Deuterium Uranium reactor) Owners Group and updated models including design change parameters are applied newly to the event analyses. The GOTHIC code has been used for the containment thermal-hydraulic analysis of Wolsong-1. Also, the SMART-IST code fitted in the Iodine Chemistry (IMOD-2) model has been used to predict nuclide behavior within the containment considering various aspects. The IMOD-2 was incorporated into SMART-IST as a module dealing with chemical transformations and mass transfer of iodine species in containment. IMOD-2 model is very sensitive to paint and chemicals. The parametric studies for the IMOD-2 model are performed to decide the analysis value set. The iodine release amount increases as the paint thickness increases. But, the iodine release amount increases as the water pH (dousing and primary heat transport (PHT)) decreases. The developed containment analysis methodology and the results of SBLOCA without Emergency Coolant Injection (ECI) are presented herein. Under the most heat-up conditions, the radionuclide release from the failed fuel into the containment and subsequently to the environment is such that the radioactive doses to the public are below the acceptable limits.

  15. Small might be beautiful, but bigger performs better: Scale economies in “green” refurbishments of apartment housing

    International Nuclear Information System (INIS)

    Michelsen, Claus; Rosenschon, Sebastian; Schulz, Christian

    2015-01-01

    The energy efficiency of the residential housing stock plays a key role in strategies to mitigate climate change and global warming. In this context, it is frequently argued that private investment and the quality of thermal upgrades are too low in the light of the challenges faced and the potential energy cost savings. While many authors address the potential barriers for investors to increase energy efficiency, studies on the capabilities of different investors to reduce energy requirements of their property are scarce. This study investigates potential advantages of housing company's size, i.e. economies of scale, economies of scope and institutional learning in thermal upgrades of residential housing. Based on unique data on energy consumption in 102,307 apartment buildings in Germany, we present new evidence for the advantages and disadvantages of a housing company's size in “green” retrofitting projects. Our estimations show, that large housing companies outperform private landlords by far in high effort refurbishment projects. In contrast, private landlords appear to have advantages in low effort, incremental refurbishment activities. We demonstrate that a substantial share of the advantages of larger firms can be associated with specialization (i.e. repeated projects). The results offer new options for policy makers to refine the support schemes toward a low carbon housing stock. - Highlights: • First study to analyze the effects of housing companies size on “green” refurbishment • Economies of scale, scope and learning all affect energy efficiency refurbishments. • Specialization on distinct refurbishments influences outcome of thermal upgrades. • Analysis based on a large and unique sample of apartment buildings in Germany

  16. Indoor PM2.5 exposure in London's domestic stock: Modelling current and future exposures following energy efficient refurbishment

    Science.gov (United States)

    Shrubsole, C.; Ridley, I.; Biddulph, P.; Milner, J.; Vardoulakis, S.; Ucci, M.; Wilkinson, P.; Chalabi, Z.; Davies, M.

    2012-12-01

    Simulations using CONTAM (a validated multi-zone indoor air quality (IAQ) model) are employed to predict indoor exposure to PM2.5 in London dwellings in both the present day housing stock and the same stock following energy efficient refurbishments to meet greenhouse gas emissions reduction targets for 2050. We modelled interventions that would contribute to the achievement of these targets by reducing the permeability of the dwellings to 3 m3 m-2 h-1 at 50 Pa, combined with the introduction of mechanical ventilation and heat recovery (MVHR) systems. It is assumed that the current mean outdoor PM2.5 concentration of 13 μg m-3 decreased to 9 μg m-3 by 2050 due to emission control policies. Our primary finding was that installation of (assumed perfectly functioning) MVHR systems with permeability reduction are associated with appreciable reductions in PM2.5 exposure in both smoking and non-smoking dwellings. Modelling of the future scenario for non-smoking dwellings show a reduction in annual average indoor exposure to PM2.5 of 18.8 μg m-3 (from 28.4 to 9.6 μg m-3) for a typical household member. Also of interest is that a larger reduction of 42.6 μg m-3 (from 60.5 to 17.9 μg m-3) was shown for members exposed primarily to cooking-related particle emissions in the kitchen (cooks). Reductions in envelope permeability without mechanical ventilation produced increases in indoor PM2.5 concentrations; 5.4 μg m-3 for typical household members and 9.8 μg m-3 for cooks. These estimates of changes in PM2.5 exposure are sensitive to assumptions about occupant behaviour, ventilation system usage and the distributions of input variables (±72% for non-smoking and ±107% in smoking residences). However, if realised, they would result in significant health benefits.

  17. A liquid hydrogen target for the calibration of the MEG and MEG II liquid xenon calorimeter

    Energy Technology Data Exchange (ETDEWEB)

    Signorelli, G., E-mail: giovanni.signorelli@pi.infn.it [INFN Sezione di Pisa, Largo B. Pontecorvo 3, 56127 Pisa (Italy); Baldini, A.M. [INFN Sezione di Pisa, Largo B. Pontecorvo 3, 56127 Pisa (Italy); Bemporad, C.; Cei, F.; Nicolò, D. [INFN Sezione di Pisa, Largo B. Pontecorvo 3, 56127 Pisa (Italy); Università di Pisa, Dipartimento di Fisica, Largo B. Pontecorvo 3, 56127 Pisa (Italy); Galli, L.; Gallucci, G.; Grassi, M. [INFN Sezione di Pisa, Largo B. Pontecorvo 3, 56127 Pisa (Italy); Papa, A. [Paul Scherrer Institut, 5232 Villigen (Switzerland); Sergiampietri, F. [INFN Sezione di Pisa, Largo B. Pontecorvo 3, 56127 Pisa (Italy); Venturini, M. [INFN Sezione di Pisa, Largo B. Pontecorvo 3, 56127 Pisa (Italy); Scuola Normale Superiore, Piazza dei Cavalieri 7, 56126 Pisa (Italy)

    2016-07-11

    We designed, built and operated a liquid hydrogen target for the calibration of the liquid xenon calorimeter of the MEG experiment. The target was used throughout the entire data taking period, from 2008 to 2013 and it is being refurbished and partly re-designed to be integrated and used in the MEG-II experiment.

  18. Study the target effect on the structural, surface and optical properties of TiO2 thin film fabricated by RF sputtering method

    Science.gov (United States)

    Vyas, Sumit; Tiwary, Rohit; Shubham, Kumar; Chakrabarti, P.

    2015-04-01

    The effect of target (Ti metal target and TiO2 target) on Titanium Dioxide (TiO2) thin films grown on ITO coated glass substrate by RF magnetron sputtering has been investigated. A comparative study of both the films was done in respect of crystalline structure, surface morphology and optical properties by using X-ray diffractometer (XRD), Atomic Force Microscopy (AFM) studies and ellipsometric measurements. The XRD results confirmed the crystalline structure and indicated that the deposited films have the intensities of anatase phase. The surface morphology and roughness values indicated that the film using Ti metal target has a smoother surface and densely packed with grains as compared to films obtained using TiO2 target. A high transmission in the visible region, and direct band gap of 3.67 eV and 3.75 eV for films derived by using Ti metal and TiO2 target respectively and indirect bandgap of 3.39 eV for the films derived from both the targets (Ti metal and TiO2 target) were observed by the ellipsometric measurements.

  19. Refurbishment of the transportation equipment, Task 3.08/04-10; Podzadatak 3.08/04-10 Remont transportnih uredjaja

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M; Bratic, A [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    Transportation equipment at the RA reactor includes the bridge crane in the reactor hall, another smaller crane, bridge crane in spent fuel storage space, crane for handling the fuel containers n the room 099 and cart of the transportation channel. Regular testing and maintenance during reactor operation was not considered sufficient, and for that reason the repair and maintenance actions were done during the refurbishment of the reactor while it has been shut-down.

  20. Austro-Hungarian Public Building Refurbishment and Energy Efficiency Measures - A Case Study on a Public Building in Sarajevo

    Science.gov (United States)

    Salihbegović, Amira; Čaušević, Amir; Rustempašić, Nerman; Avdić, Dženis; Smajlović, Esad

    2017-10-01

    Among other pieces of architectural historical heritage in Sarajevo, and Bosnia-Herzegovina in general, the Austro-Hungarian architecture has preserved its original architectural, artistic and engineering characteristics. Both residential and public representative urban blocks, streets and squares are of distinguishable ambience in the architectural and urban image of the city and are testifying about our architectural past. A number of buildings is valorised and protected by law in terms of their architectural, artistic and historical value. In addition, these buildings have a distinct functional, ambiental, historical, and even aesthetical value. To make them last longer, refurbishment of these buildings is challenging and presents potential and multiple benefits for the city, and beyond. Refurbishing built environment through functional reorganizing, redesign and energy efficiency measures applications could result in prolonged longevity, architectural identity preservation and interior comfort improvement. Besides, implemented measures for energy efficiency, through the refurbishment process, should optimize the needs for energy consumption in treated buildings. This paper defines options in comfort improvements and redesign, without implying risks to the building longevity, analyses interventions and energy efficiency measures which would enable potential energy saving assessment in the refurbishment process of masonry buildings. This paper also discusses the different techniques that can be adopted for conservation and preservation of historical masonry buildings from the Austro-Hungarian period dealing with energy efficiency. The works were preceded by historical research and on-site investigations. This paper describes a methodology to quantify their vulnerability. A scheme of structural retrofitting is suggested following the research conducted. Revitalization of the building consisted in the reconstruction of the old building structure, creating the inner

  1. Corrosion inhibition measures in primary cooling water system during refurbishment of Cirus, re-commissioning and subsequent operation

    International Nuclear Information System (INIS)

    Rai, K.K.; Ramesh, N.; Sharma, R.C.

    2008-01-01

    Cirus is a 40 MWth, heavy water moderated, demineralized light water cooled, natural uranium fuelled research reactor. Reactor was commissioned in year 1960 and operated satisfactorily till 1990. After that availability factor started decreasing mainly due to equipment outage exhibiting signs of ageing. Based upon systematic ageing studies and assessment of condition of systems, structures and components, a refurbishment plan including safety upgrades was drawn up. Reactor was shut down in October 1997 for execution of jobs. After completion of refurbishment jobs reactor was started back in October 2002 and power operation was achieved in 2003. Primary cooling water (PCW) system consists of re-circulating pumps, heat exchangers, expansion tank, piping, valves, emergency storage reservoir (Ball Tank) and other components. Normally the fission heat from fuel is removed by re-circulating coolant in closed loop and transferred to seawater via heat exchangers. In case of outage of pumps, shut down cooling is provided by flow of water from Ball Tank under gravity to the underground dump tanks. The dissolved oxygen is maintained below 2 ppm and pH is maintained neutral to minimize corrosion of fuel cladding (Aluminum). This paper highlights the experience gained during segmentation of primary cooling water pipelines for pressure testing, measures taken to corrosion inhibition of primary cooling water lines to permit execution of refurbishment jobs, inspections and actions taken to repair/replace the corroded PCW pipe line segments, observations regarding corrosion related failures, re-commissioning of the system after refurbishment, assessment for safe reactor operation and experience during power operation. (author)

  2. Energy refurbishment of the Italian residential building stock: energy and cost analysis through the application of the building typology

    International Nuclear Information System (INIS)

    Ballarini, Ilaria; Corrado, Vincenzo; Madonna, Francesco; Paduos, Simona; Ravasio, Franco

    2017-01-01

    The European residential building stock is largely composed of buildings with poor energy performance, therefore basic retrofit actions could lead to significant energy savings. However, energy refurbishment measures should be identified in accurate way, taking into account the technical viability and aiming both to increase the building energy performance and to restrain the costs. The present article investigates the effects of different measures applied to the Italian residential building stock by using the building typology, which consists of 120 building types, representative of six construction ages, four building sizes and five climatic zones. A quasi-steady state model has been used to calculate the energy performance; the economic evaluation has been carried out as specified in the EU cost-optimal comparative methodology (Directive 2010/31/EU). The most effective measures and packages of measures, in terms of energy saving and global cost reduction, are identified and discussed. The results are addressed to important purposes for energy policy, as for instance: (a) to provide political authorities with the most effective energy efficiency measures as to encourage retrofit processes through the allocation of financial incentives, (b) to offer a knowledge-base for developing energy refurbishment scenarios of residential building stocks and forecasting future energy resource demand. - Highlights: • Investigation of energy savings and cost effectiveness of the Italian housing stock refurbishments. • Application of the building typology approach of the IEE-TABULA project. • Knowledge-base for bottom-up models of the building stock energy performance. • Supporting the political authorities to promote effective refurbishment measures.

  3. Renewable-based low-temperature district heating for existing buildings in various stages of refurbishment

    DEFF Research Database (Denmark)

    Brand, Marek; Svendsen, Svend

    2013-01-01

    Denmark is aiming for a fossil-free heating sector for buildings by 2035. Judging by the national heating plan, this will be achieved mainly by a further spread of DH (district heating) based on the renewable heat sources. To make the most cost-effective use of these sources, the DH supply...... and, for 98% of the year, to below 60 °C. However for the temperatures below 60 °C a low-temperature DH substation is required for DHW (domestic hot water) heating. This research shows that renewable sources of heat can be integrated into the DH system without problems and contribute to the fossil...... temperature should be as low as possible. We used IDA–ICE software to simulate a typical Danish single-family house from the 1970s connected to DH at three different stages of envelope and space heating system refurbishment. We wanted to investigate how low the DH supply temperature can be without reducing...

  4. A containment analysis for SBLOCA without ECI in the refurbished Wolsong-1 Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Kim, T.M.; Moon, B.J.; Bae, C.J.; Lee, S.H.; Choi, C.J.; Lee, D.S. [NSSS, Korea Power Engineering Company, Inc., Daejeon (Korea, Republic of); Kim, S.M. [NETEC, Korea Hydro and Nuclear Power Company, Inc., Daejeon (Korea, Republic of)

    2010-07-01

    A small break leading to loss of coolant accident (SBLOCA), being one of the topic accidents in the nuclear plant diagnosis in recent years, has been analyzed and evaluated for the refurbished Wolsong-1 Nuclear Power Plant (NPP). The industry standard toolset (IST) codes developed by CANDU Owners Group and updated models including design change parameters are applied to the event analyses. GOTHIC code has been used for the containment analysis of Wolsong-1. Also, SMART-IST code fitted in the Iodine Chemistry (IMOD-2) model has been used to predict nuclide behavior within the containment considering various aspects. IMOD-2 was incorporated into SMART-IST as a module dealing the chemical transformations and mass transfer of iodine species in containment. IMOD-2 model is very sensitive to paint and chemicals. The parameter studies for IMOD-2 model are performed to decide the analysis value set. The developed methodology and the results of SBLOCA without ECI are presented herein. Under the most heat-up conditions, the radionuclide release from the failed fuel into the containment and subsequently to the environment is such that the radioactive doses to the public are below the acceptable limits. (author)

  5. Point Lepreau refurbishment project programmable digital comparator (PDC) replacement for SDS1 and SDS2

    International Nuclear Information System (INIS)

    Ichiyen, N.M.; Chan, D.; Thompson, P.D.

    2003-01-01

    NB Power is tentatively planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station (PLGS) starting in April 2007. The scope of the outage was determined from the outcome of a two year study (Phase 1) involving a detailed condition assessment of the station which examined issues relating to ageing and obsolescence, along with a detailed review of Safety and Licensing issues associated with extended operation. In order to minimize schedule and regulatory risk for the Refurbishment project, pre-project work was initiated in early 2002. This program is called Phase 2 ESA (Early Start Activities). As part of the Phase 1 assessments it was concluded that replacement of the PDCs (Programmable Digital Comparators) for both shutdown systems was required in order to ensure operation of the plant for a further 25-30 years. Critical tasks were identified related to PDC replacement as part of the Phase 2 ESA program. This paper describes the activities that have taken place in the Phase 2 ESA program as well as the plan for future work for the PDC replacement for SDS 1 (Shutdown System Number One) and SDS2 (Shutdown System Number Two). (author)

  6. The NNR requirements to address modification, modernization, refurbishment and ageing management

    International Nuclear Information System (INIS)

    Thugwane, Samuel

    2013-01-01

    The National Nuclear Regulator (NNR) is a national competent authority in South African which has been mandated under Act 47 of 1999 to provide for the protection of property people and environment. The NNR achieves its mandated by issuing Nuclear Authorisations in case of Nuclear Installations and Certificate of registration for the mining industry. Currently SAFARI-1 Research Reactor at Pelindaba site is the only Research Reactor that is licensed by NNR through a Process based licensing. SAFARI-1 is a 20 MW research reactor and has been in operation since 1965 and is approaching its full lifetime. Regular, periodic and systematic examination, inspection, maintenance and testing of all plant, systems, structures and components have been developed and implemented. Modification and refurbishment has been implemented over years since its construction. Ageing of structural components and obsolescence is now becoming a challenge; as a result, Ageing Management Programme has been developed to address these issues. In accordance with the NNR requirements any modification that the licensee plan to implement, must comply with NNR approved processes and procedures relating to control of such modification to the design of existing plant, facility or system design, including modifications that may be of a temporary nature

  7. Saving money on rig refurbishments through foreign trade zones or duty-drawback

    International Nuclear Information System (INIS)

    Ward, R.J. Jr.

    1997-01-01

    The recent boom in day rates for rigs capable of drilling in deep water and harsh environments has created a frenzy of rig refurbishment activity in shipyards located in US Gulf states. In most instances, the destination for the rigs upon completion is the US Outer Continental Shelf (USOCS) in the Gulf of Mexico. The problem faced by contractors/operators planning to use US shipyards is that this circumstance has caused difficulty in shielding rigs and their foreign-sourced components from US Customs duties. Under US Customs law, a bona fide exportation requires severance from US commerce and joining to the commerce of some foreign country or, in the case of a vessel supply, a qualifying international voyage. The USOCS does not qualify as an exportation, nor do movements to drilling sites located on it qualify as an international voyage. Described here are two possible solutions to this economic dilemma and an example of how the foreign trade zone solution was applied by Global marine in its plans for upgrading some of its semisubmersible drilling rigs for deepwater USOCS work

  8. In-Space Repair and Refurbishment of Thermal Protection System Structures for Reusable Launch Vehicles

    Science.gov (United States)

    Singh, M.

    2007-01-01

    Advanced repair and refurbishment technologies are critically needed for the thermal protection system of current space transportation systems as well as for future launch and crew return vehicles. There is a history of damage to these systems from impact during ground handling or ice during launch. In addition, there exists the potential for in-orbit damage from micrometeoroid and orbital debris impact as well as different factors (weather, launch acoustics, shearing, etc.) during launch and re-entry. The GRC developed GRABER (Glenn Refractory Adhesive for Bonding and Exterior Repair) material has shown multiuse capability for repair of small cracks and damage in reinforced carbon-carbon (RCC) material. The concept consists of preparing an adhesive paste of desired ceramic with appropriate additives and then applying the paste to the damaged/cracked area of the RCC composites with an adhesive delivery system. The adhesive paste cures at 100-120 C and transforms into a high temperature ceramic during reentry conditions. A number of plasma torch and ArcJet tests were carried out to evaluate the crack repair capability of GRABER materials for Reinforced Carbon-Carbon (RCC) composites. For the large area repair applications, Integrated Systems for Tile and Leading Edge Repair (InSTALER) have been developed and evaluated under various ArcJet testing conditions. In this presentation, performance of the repair materials as applied to RCC is discussed. Additionally, critical in-space repair needs and technical challenges are reviewed.

  9. Refurbishment of the Primary Cooling System of the Puspati Triga Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Ramli, S.; Zakaria, M. F.; Masood, Z. [Malaysian Nuclear Agency, Kajang (Malaysia)

    2014-08-15

    The refurbishment of the 27 year old primary cooling system of the 1 MW PUSPATI TRIGA reactor was completed in April 2010 over an eight month outage. The project was implemented with the dual objective of meeting current user needs as well as a future reactor core power upgrade. Hence the cooling system was partly modernized to cater for a 3 MW{sub th} reactor by installing higher capacity heat exchangers and pumps while maintaining the piping and valve sizes. The old 1 MW tube and shell heat exchanger, which had lost 25% of its heat exchange capacity, was replaced with two 1.5 MW plate type heat exchangers. Several manually operated valves were replaced with motorized units to allow remote operation from the control room. The installed cooling system was flushed with distilled water and then subjected to hydrostatic pressure tests. In the cold run test, the system was operated for an hour for every pump and heat exchanger combination while all operating parameters were checked. In the hot run test, the same was done at four levels of increasing reactor power, and dose measurements were also recorded. The paper gives the design, installation, testing and commissioning details of the project. (author)

  10. Energy Refurbishment of an Office Building with Hybrid Photovoltaic System and Demand-Side Management

    Directory of Open Access Journals (Sweden)

    Giovani Almeida Dávi

    2017-08-01

    Full Text Available On-site photovoltaic (PV and battery systems intend to improve buildings energy performance, however battery costs and monetary incentives are a major drawback for the introduction of these technologies into the electricity grids. This paper proposes an energy refurbishment of an office building based on multi-objective simulations. An innovative demand-side management approach is analyzed through the PV and battery control with the purpose of reducing grid power peaks and grid imported energy, as well as improving the project economy. Optimization results of load matching and grid interaction parameters, complemented with an economic analysis, are investigated in different scenarios. By means of battery use, the equivalent use of the grid connection is reduced by 12%, enhancing the grid interaction potential, and 10% of load matching rates can be increased. Project improvements indicate the grid connection capacity can be reduced by 13% and significant savings of up to 48% are achieved on yearly bills. The economy demonstrates the grid parity is only achieved for battery costs below 100 €/kWh and the payback period is large: 28 years. In the case with only PV system, the grid parity achieves better outcomes and the payback time is reduced by a half, making this a more attractive option.

  11. Life extension studies and refurbishing of C and I systems of Cirus

    International Nuclear Information System (INIS)

    Awale, P.K.; Sumanth, P.; Roy, Kallol; Bharadwaj, G.

    2005-01-01

    Effects of ageing and component obsolescence of C and I systems of Cirus has been studied, by classifying the C and I systems as (a) those which may affect the operating life of the plant and cannot be repaired/replaced without core-unloading and dismantling the reactor structure. (Group-A), (b) those components which can be repaired/replaced but with considerable difficulty (Group-B) and (c) those which do not affect plant operations and can be easily repaired or replaced (Group-C). Life extension studies included performance assessment, reliability centred evaluation, parametric deviations from base-line characteristics and identification of specific ageing phenomenon and examination of internals. Based on these studies a comprehensive ageing mitigation programme was evolved, necessitating suitable modifications, instrumentation upgradation and component repair/replacement. A major modification job has been to provide an alternate failed fuel detection (FFD) system, since the success rate of the present system, had been decreasing over the years. Further, taking advantage of the available refurbishing outage, a number of instruments and accessories, pertaining to Group-C, were also replaced with state-of-the-art, components. Consideration is also given to requirements of special reactor start-up instrumentation for sensing the initial low neutron count in presence of a high gamma background, during the ensuing reactor start-up with fresh fuel. (author)

  12. In search of a holistic, sustainable and replicable model for complete energy refurbishment in historic buildings

    Directory of Open Access Journals (Sweden)

    Marija S. Todorović

    2012-12-01

    Full Text Available The reduction of greenhouse gas emissions in buildings offers one of the most promising opportunities for developed and developing countries to cooperate in achieving the realization of significant energy efficiency improvements. However, achieving sustainability is not an easy task unless there is synergy with/between energy efficiency improvement and renewable energy sources (RES - these are not at present in widespread dissemination and use. This paper recognizes the synergetic relationship between conservation and sustainability. At present, the role of heritage conservation in achieving sustainability has not yet been fully recognized, nor have heritage needs been well integrated into sustainability initiatives. Historic buildings are inherently sustainable. Preservation maximizes the use of existing materials and infrastructures, reduces waste, and preserves the historical character of older towns and cities. Sustainability begins with preservation. Taking into account the original climatic adaptations of historic buildings, today’s sustainable technology can supplement inherent sustainable features without compromising their unique historical character. Furthermore, a number of paper reviews and case studies with related methodologies outline the need to implement the latest current knowledge and technologies (BPS - Building Performance Simulation and CFD - Computational Fluid Dynamics for use in the refurbishment design process, as well as highlighting the crucial importance of sustainability, relevant benchmarking and rating system development.

  13. The NNR requirements to address modification, modernization, refurbishment and ageing management

    Energy Technology Data Exchange (ETDEWEB)

    Thugwane, Samuel [National Nuclear Regulator, Pretoria (South Africa)

    2013-07-01

    The National Nuclear Regulator (NNR) is a national competent authority in South African which has been mandated under Act 47 of 1999 to provide for the protection of property people and environment. The NNR achieves its mandated by issuing Nuclear Authorisations in case of Nuclear Installations and Certificate of registration for the mining industry. Currently SAFARI-1 Research Reactor at Pelindaba site is the only Research Reactor that is licensed by NNR through a Process based licensing. SAFARI-1 is a 20 MW research reactor and has been in operation since 1965 and is approaching its full lifetime. Regular, periodic and systematic examination, inspection, maintenance and testing of all plant, systems, structures and components have been developed and implemented. Modification and refurbishment has been implemented over years since its construction. Ageing of structural components and obsolescence is now becoming a challenge; as a result, Ageing Management Programme has been developed to address these issues. In accordance with the NNR requirements any modification that the licensee plan to implement, must comply with NNR approved processes and procedures relating to control of such modification to the design of existing plant, facility or system design, including modifications that may be of a temporary nature.

  14. Digital fabrication

    CERN Document Server

    2012-01-01

    The Winter 2012 (vol. 14 no. 3) issue of the Nexus Network Journal features seven original papers dedicated to the theme “Digital Fabrication”. Digital fabrication is changing architecture in fundamental ways in every phase, from concept to artifact. Projects growing out of research in digital fabrication are dependent on software that is entirely surface-oriented in its underlying mathematics. Decisions made during design, prototyping, fabrication and assembly rely on codes, scripts, parameters, operating systems and software, creating the need for teams with multidisciplinary expertise and different skills, from IT to architecture, design, material engineering, and mathematics, among others The papers grew out of a Lisbon symposium hosted by the ISCTE-Instituto Universitario de Lisboa entitled “Digital Fabrication – A State of the Art”. The issue is completed with four other research papers which address different mathematical instruments applied to architecture, including geometric tracing system...

  15. Energy analysis and refurbishment proposals for public housing in the city of Bari, Italy

    International Nuclear Information System (INIS)

    Di Turi, Silvia; Stefanizzi, Pietro

    2015-01-01

    From the perspectives of the energy and the environment, building stock should be considered a useful resource in the struggle against greenhouse gas emissions and scarcity of energy resources. The aim of this work is to provide an example of the application of a methodology to evaluate the energy needs of the building stock of a city and to determine the possible strategies for energy planning. This paper aims to obtain an estimate, on an urban scale, of the energy needs and CO 2 emissions of the public residential buildings of Bari. This estimate is achieved by evaluating the critical issues of the built heritage, the most common architectural typologies and the heating systems in the territory of the city of Bari in southern Italy, as well as the possible strategies for upgrading energy efficiency, through the combined use of energy software and geo-referenced systems. Furthermore, several possible interventions are assumed to improve the energy performance of buildings in not only environmental terms but also economic terms through the instrument of cost–benefit analysis. The ultimate goal is to compare the different intervention strategies to determine which demonstrate greater cost effectiveness and feasibility for future energy planning. - Highlights: • An evaluation of the energy needs of existing buildings in a city in Southern Italy is provided. • Possible refurbishment strategies are evaluated. • An economic analysis is carried out to understand the feasibility of interventions. • An estimate on an urban scale of the energy-saving potential of public housing in Bari is provided

  16. Refurbishment of Pakistan research reactor (PARR-1) for stainless steel lining of the reactor pool

    International Nuclear Information System (INIS)

    Salahuddin, A.; Israr, M.; Hussain, M.

    2002-01-01

    Pakistan Research Reactor-1 (PARR-1) is a pool-type research reactor. Reactor aging has resulted in the increase of water seepage from the concrete walls of the reactor pool. To stop the seepage, it was decided to augment the existing pool walls with an inner lining of stainless steel. This could be achieved only if the pool walls could be accessed unhindered and without excessive radiation doses. For this purpose a partial decommissioning was done by removing all active core components including standard/control fuel elements, reflector elements, beam tubes, thermal shield, core support structure, grid plate and the pool's ceramic tiles, etc. An overall decommissioning program was devised which included procedures specific to each item. This led to the development of a fuel transport cask for transportation, and an interim fuel storage bay for temporary storage of fuel elements (until final disposal). The safety of workers and the environment was ensured by the use of specially designed remote handling tools, appropriate shielding and pre-planned exposure reduction procedures based on the ALARA principle. During the implementation of this program, liquid and solid wastes generated were legally disposed of. It is felt that the experience gained during the refurbishment of PARR-1 to install the stainless steel liner will prove useful and better planning and execution for the future decommissioning of PARR-1, in particular, and for other research reactors like PARR-2 (27 kW MNSR), in general. Furthermore, due to the worldwide activities on decommissioning, especially those communicated through the IAEA CRP on 'Decommissioning Techniques for Research Reactors', the importance of early planning has been well recognized. This has made possible the implementation of some early steps like better record keeping, rehiring of trained manpower, and creation of interim and final waste storage. (author)

  17. Refurbishment priorities at the Russian coal-fired power sector for cleaner energy production case studies

    Energy Technology Data Exchange (ETDEWEB)

    P. Grammelis; N. Koukouzas; G. Skodras; E. Kakaras; A. Tumanovsky; V. Kotler [Centre for Research and Technology Hellas/Institute of Solid Fuels Technology and Applications (CERTH/ISFTA), Ptolemaida (Greece)

    2006-11-15

    The paper reviews the current status of the coal-fired power sector in Russia, the prospects for renovation activities based on Clean Coal Technologies (CCT) and presents two case studies on potential refurbishment projects. Data were collected for 180 thermoelectric units with capacity higher than 100 MWe and the renovation needs of the power sector, among the retrofitting, repowering and reconstruction options, were estimated through a multi-criteria analysis. The most attractive system to renovate a power plant between the Supercritical Combustion (SC) and the Fluidized Bed Combustion (FBC) technologies was evaluated. The application of each of the aforementioned technologies at the Kashirskaya and Shaturskaya power plants was studied and their replication potential in the Russian coal-fired power plant park was examined. Nowadays, the installed capacity of coal-fired power plants in the Russian Federation is 29.3 GWe, while they account for about 19% of the total electricity generation in the area. The low efficiency and especially the advanced age are the determinant factors for renovation applications at the Russian units. Even in the more conservative modernization scenario, over 30% of the thermoelectric units have to be repowered or reconstructed. Concrete proposals about the profitable and reliable operation of two Russian thermoelectric units with minimized environmental effects were elaborated. A new unit of 315 MWe with supercritical steam parameters and reburning for NOx abatement is envisaged to upgrade Unit 1 of Kashirskaya power station, while new circulating fluidized bed (CFB) boilers of the same steam generation is the most promising renovation option for the boilers of Unit 1 in Shaturskaya power station. 11 refs., 15 figs., 7 tabs.

  18. Laser-fusion target fabrication: application of organic coatings to metallic and nonmetallic micropellets by the glow-discharge polymerization of p-xylene

    International Nuclear Information System (INIS)

    Simonsic, G.A.

    1976-01-01

    Laser-fusion targets require thin, uniform organic-film coatings. A coating technique involving glow-discharge polymerization is described for applying highly adherent, extremely uniform, thin films of a high-temperature polymer to a variety of microsubstrates. Polymeric coatings as thick as 10 μm have been successfully deposited on hollow, spherical, 40- to 250-μm-diam micropellets of glass, metal-coated glass, and nickel/manganese alloy. Experimental yields of coatings of a quality acceptable for laser-fusion targets are typically greater than 90 percent

  19. Heavy-ion targets

    International Nuclear Information System (INIS)

    Adair, H.L.; Kobisk, E.H.

    1985-01-01

    This chapter examines the characteristics of targets required in heavy-ion accelerator physics experiments. The effects of target parameters on heavy-ion experimental results are reviewed. The target fabrication and characterization techniques used to minimize experimental problems during heavy-ion bombardment are described. Topics considered include target thickness and uniformity, target lifetime, target purity, substrate materials, Doppler shift effects, metal preparations, and target preparation methods

  20. Magnetic control system targeted for capsule endoscopic operations in the stomach--design, fabrication, and in vitro and ex vivo evaluations.

    Science.gov (United States)

    Lien, Gi-Shih; Liu, Chih-Wen; Jiang, Joe-Air; Chuang, Cheng-Long; Teng, Ming-Tsung

    2012-07-01

    This paper presents a novel solution of a hand-held external controller to a miniaturized capsule endoscope in the gastrointestinal (GI) tract. Traditional capsule endoscopes move passively by peristaltic wave generated in the GI tract and the gravity, which makes it impossible for endoscopists to manipulate the capsule endoscope to the diagnostic disease areas. In this study, the main objective is to present an endoscopic capsule and a magnetic field navigator (MFN) that allows endoscopists to remotely control the locomotion and viewing angle of an endoscopic capsule. The attractive merits of this study are that the maneuvering of the endoscopic capsule can be achieved by the external MFN with effectiveness, low cost, and operation safety, both from a theoretical and an experimental point of view. In order to study the magnetic interactions between the endoscopic capsule and the external MFN, a magnetic-analysis model is established for computer-based finite-element simulations. In addition, experiments are conducted to show the control effectiveness of the MFN to the endoscopic capsule. Finally, several prototype endoscopic capsules and a prototype MFN are fabricated, and their actual capabilities are experimentally assessed via in vitro and ex vivo tests using a stomach model and a resected porcine stomach, respectively. Both in vitro and ex vivo test results demonstrate great potential and practicability of achieving high-precision rotation and controllable movement of the capsule using the developed MFN.

  1. Proposal for the risk management implementation phase in oil field development project by adding value on the refurbishment of critical equipment

    Directory of Open Access Journals (Sweden)

    Hamid Abdul

    2017-01-01

    Full Text Available Refurbishment process is a conceptual stage in product life cycle. It is utilized in existing equipment in the field by adding value to recondition and repaired equipment. The main interest of this paper is to implement and design risk management implementation phase in oil field development project on the refurbishment of critical equipment in oil and gas industry. This paper is provided base on research and experiences in risk management and learned from practical team in industry which matched by an application in oil field development project in refurbishment of critical equipment. A framework of implementation phase for risk management in oil field development project in refurbishment critical equipment were reviewed and added value on communication skills of the project team to the stakeholder and organization, which support to external body and vice-versa. Risk management framework can be used for reference of refurbishment process with simply process and developed with same concept for the next wide development project in industry.

  2. Effects of Sb-doping on the grain growth of Cu(In, Ga)Se2 thin films fabricated by means of single-target sputtering

    International Nuclear Information System (INIS)

    Zhang, Shu; Wu, Lu; Yue, Ruoyu; Yan, Zongkai; Zhan, Haoran; Xiang, Yong

    2013-01-01

    To investigate the effects of Sb doping on the kinetics of grain growth in Cu(In,Ga)Se 2 (CIGS) thin films during annealing, CIGS thin films were sputtered onto Mo coated substrates from a single CIGS alloy target, followed by chemical bath deposition of Sb 2 S 3 thin layers on top of CIGS layers and subsequent annealing at different temperatures for 30 min in Se vapors. X-ray diffraction results showed that CIGS thin films were obtained directly using the single-target sputtering method. After annealing, the In/Ga ratio in Sb-doped CIGS thin films remained stable compared to undoped film, possibly because Sb can promote the incorporation of Ga into CIGS. The grain growth in CIGS thin films was enhanced after Sb doping, exhibiting significantly larger grains after annealing at 400 °C or 450 °C compared to films without Sb. In particular, the effect was strikingly significant in grain growth across the film thickness, resulting in columnar grain structure in Sb-doped films. This grain growth improvement may be led by the diffusion of Sb from the front surface to the CIGS-Mo back interface, which promoted the mass transport process in CIGS thin films. - Highlights: ► Cu(In,Ga)Se 2 (CIGS) thin films made by sputtering from a single CIGS target. ► Chemical bath deposition used to introduce antimony into CIGS absorber layers. ► In/Ga ratio decreases in Sb-doped annealed films, comparatively to undoped films. ► Sb-doped CIGS films are superior to undoped films in terms of grain-growth kinetics

  3. Influence of the laser pulse repetition rate and scanning speed on the morphology of Ag nanostructures fabricated by pulsed laser ablation of solid target in water

    Science.gov (United States)

    Nikolov, A. S.; Balchev, I. I.; Nedyalkov, N. N.; Kostadinov, I. K.; Karashanova, D. B.; Atanasova, G. B.

    2017-11-01

    Nanostructures of noble metal were produced by pulsed laser ablation in liquid. A solid Ag target was immersed in double distilled water and a CuBr laser in a master oscillator—power amplifier configuration oscillating at 511 nm and emitting pulses with duration of 30 ns at a repetition rate of up to 20 kHz was employed to produce different colloids. The impact was studied of the laser pulse repetition rate and the beam scanning speed on the morphology of the nanostructures formed. Further, the optical extinction spectra of the colloids in the UV/VIS range were measured and used to make an indirect assessment of the changes in the shape and size distribution of the nanostructures. The transmission values in the near UV range were used to estimate the efficiency of the ablation process under the different experimental conditions implemented. A visualization of the nanostructures was made possible by transmission electron microscopy (TEM). The structure and phase composition of the nanoparticles were studied by high-resolution transmission electron microscopy (HRTEM) and selected area electron diffraction (SAED), while the alteration of the target surface caused by the impact of the high-repetition-rate laser illumination was investigated by X-ray photoelectron spectroscopy (XPS). The optimal conditions were determined yielding the highest efficiency in terms of amount of ablated material.

  4. In-Ga-Zn-oxide thin-film transistors with Sb2TeOx gate insulators fabricated by reactive sputtering using a metallic Sb2Te target

    International Nuclear Information System (INIS)

    Cheong, Woo-Seok

    2011-01-01

    Using reactive sputtering, we made transparent amorphous Sb 2 TeO x thin films from a metallic Sb 2 Te target in an oxidizing atmosphere. In-Ga-Zn-oxide thin-film transistors (IGZO TFTs) with Sb 2 TeO x gate insulators deposited at room temperature showed a large hysteresis with a counter clockwise direction, which was caused by mobile charges in the gate insulators. The problems of the mobile charges was solved by using Sb 2 TeO x films formed at 250 .deg. C. After the IGZO TFT had been annealed at 200 .deg. C for 1 hour in an O 2 ambient, the mobility of the IGZO TFT was 22.41 cm 2 /Vs, and the drain current on-off ratio was ∼10 8 .

  5. Home-made refurbishment of the instrumentation and control system of the TRIGA reactor of the University of Pavia

    International Nuclear Information System (INIS)

    Borio di Tigliole, A.; Cagnazzo, M.; Magrotti, G.; Manera, S.; Salvini, A.; Musitelli, G.; Nardo, R.

    2008-01-01

    The Instrumentation and Control (I and C) System of the TRIGA reactor of the University of Pavia was dated and, in order to grant a safe and continuous reactor operation for the future, it became necessary to substitute or to upgrade the system. Since the substitution of the I and C system with a new-made one was very difficult to be performed due to long authorization procedures, an home-made refurbishment was planned. Using commercial components of high quality, almost a complete substitution, channel-by-channel, of the I and C system was realized without changing the operating and safety logics. The system includes: - the Reactor Linear Power Channel and Chart Recorder; - the Reactor Percent Power Safety Channel; - the High Voltage and Low Voltage Power Supply; - the Automatic Reactor Power Control; - the Fuel Elements and Cooling-Water Temperatures Measuring Channels; - the Water Conductivity Measuring Channel. The refurbished I and C system shows a very good operational behavior and reliability and will assure a continuous operation of the reactor for the future

  6. Factors relevant to the recycling or reuse of components arising from the decommissioning and refurbishment of nuclear facilities

    International Nuclear Information System (INIS)

    1988-01-01

    The decommissioning and decontamination of nuclear facilities is a topic of great interest to many Member States of the International Atomic Energy Agency (IAEA) because of the large number of older nuclear facilities which are or soon will be retired from service. To assist in the development of the required decommissioning expertise, the IAEA is developing reports and recommendations which will eventually form an integrated information base covering in a systematic way the wide range of topics associated with decommissioning. This information is required so that Member States can decommission their nuclear facilities in a safe, timely and cost effective manner and the IAEA can effectively respond to requests for assistance. One area which warrants more detailed analyses is an assessment of the factors important to the recycling or reuse of components arising from the refurbishment or decommissioning of nuclear plants, the topic of the present report. The document provides an up to date review of the engineering, social, scientific and administrative factors relevant to the safe recycling or reuse of components arising from decommissioning or refurbishment of nuclear facilities. This report should be of interest to owners, operators, policy makers and regulators involved with nuclear facilities, especially those in developing countries. Refs, figs and tabs

  7. Refurbishment, Modernization and Ageing Management Program of The 3MW TRIGA Mark-II Research Reactor of Bangladesh

    International Nuclear Information System (INIS)

    Salam, M. A.

    2013-01-01

    The 3 MW TRIGA MK-II research reactor of Bangladesh Atomic Energy Commission (BAEC) achieved its first criticality on 14 September 1986. The reactor has been used for manpower training, radioisotope production and various R and D activities in the field of neutron activation analysis, neutron radiography and neutron scattering. Reactor Operation and Maintenance Unit (ROMU) is responsible for operation and maintenance of the research reactor. During the past twenty seven years ROMU carried out several refurbishments, replacement, modification and modernization activities in the reactor facility. The major tasks carried out under refurbishment program were replacement of the corrosion damaged N-16 decay tank by a new one, replacement of the fouled shell and tube type heat exchanger by a plate type one, modification of the shielding arrangements around the N-16 decay tank and ECCS system and solving the radial beam port-1 leakage problem. All of these refurbishment activities were performed under an annual development project (ADP) funded by Bangladesh government. BAEC research reactor (RR) was operated by analogue console system from its commissioning to July, 2011. Old analog based console has been replaced by digital console on June, 2012. Modernization program for the reactor control console due to obsolescence and unavailability of spare parts of I and C system was vital to restore the safe operation of the reactor. Considering these facts, installation of a digital control console and I and C system based on the state-of-the-art digital technology became necessary. Reactor digital console system installation tasks were performed under another ADP funded project by Bangladesh government. Now the reactor is operating with the digital control system. Besides this, the Neutron Radiography (NR) facility has been modernized by the addition of a digital neutron radiography set-up at the tangential beam port. The Neutron Scattering (NS) facility also has been upgraded

  8. Refurbishment, Modernization and Ageing Management Program of The 3MW TRIGA Mark-II Research Reactor of Bangladesh

    Energy Technology Data Exchange (ETDEWEB)

    Salam, M. A. [Atomic Energy Research Establishment, Dhaka (Bangladesh)

    2013-07-01

    The 3 MW TRIGA MK-II research reactor of Bangladesh Atomic Energy Commission (BAEC) achieved its first criticality on 14 September 1986. The reactor has been used for manpower training, radioisotope production and various R and D activities in the field of neutron activation analysis, neutron radiography and neutron scattering. Reactor Operation and Maintenance Unit (ROMU) is responsible for operation and maintenance of the research reactor. During the past twenty seven years ROMU carried out several refurbishments, replacement, modification and modernization activities in the reactor facility. The major tasks carried out under refurbishment program were replacement of the corrosion damaged N-16 decay tank by a new one, replacement of the fouled shell and tube type heat exchanger by a plate type one, modification of the shielding arrangements around the N-16 decay tank and ECCS system and solving the radial beam port-1 leakage problem. All of these refurbishment activities were performed under an annual development project (ADP) funded by Bangladesh government. BAEC research reactor (RR) was operated by analogue console system from its commissioning to July, 2011. Old analog based console has been replaced by digital console on June, 2012. Modernization program for the reactor control console due to obsolescence and unavailability of spare parts of I and C system was vital to restore the safe operation of the reactor. Considering these facts, installation of a digital control console and I and C system based on the state-of-the-art digital technology became necessary. Reactor digital console system installation tasks were performed under another ADP funded project by Bangladesh government. Now the reactor is operating with the digital control system. Besides this, the Neutron Radiography (NR) facility has been modernized by the addition of a digital neutron radiography set-up at the tangential beam port. The Neutron Scattering (NS) facility also has been upgraded

  9. Refurbishing the reactor protection systems of VVER-440/230 and VVER-1000/320 nuclear power plants with exclusively digital IandC systems

    International Nuclear Information System (INIS)

    Martin, M.

    1997-01-01

    The refurbishment of reactor protection systems of nuclear power plants is based on two sets of requirements: engineering aspects such as performance, qualification and licensing, as well as interfaces to other systems; and cost-benefit relationships, ease of service and maintenance as well as installation during scheduled outages. A number of WWER-440 and WWER-1000 nuclear plants have announced their intention to refurbish their protection systems. Since 1994, these plants have been placing orders with Siemens for new protection systems, including the neutron flux monitoring system utilizing the advanced system TELEPERM XS. This exclusively digital IandC system provides an excellent foundation for the remaining plant service life

  10. Target support for inertial confinement fusion

    International Nuclear Information System (INIS)

    Schultz, K.R.

    1995-08-01

    General Atomics (GA) plays an important industrial support role for the US Inertial Confinement Fusion (ICF) program in the area of target technology. This includes three major activities: target fabrication support, target handling systems development, and target chamber design. The work includes target fabrication for existing ICF experiments, target and target system development for future experiments, and target research and target chamber design for experiments on future machines, such as the National Ignition Facility (NIF)

  11. Fabricator opens next chapter in style

    International Nuclear Information System (INIS)

    Knott, Terry.

    1997-01-01

    The evolution of two offshore fabrication yards over twenty five years at Nigg and Ardersier on the Cromarty and Moray Firths in Scotland is traced. For most of the period since opening in 1972, the two yards operated as separate competing entities under the ownership of the construction companies Brown and Root and McDermott. In the early 1990s, market demand was shifting from the yard's traditional base of fixed platforms to floating and subsea technology while competition in the fabrication industry was growing in Europe. In response to this market challenge, in 1995 the two companies entered into a joint venture to operate the two yards as one entity, Barmac. Within three months of the formation of Barmac, the decision was taken to focus participation in the traditional offshore market at Ardersier and redevelop Nigg to take advantage of the rapidly expanding marine business. The key to this has been the transformation of Nigg's dormant graving dock into a dry dock capable of handling new market applications such as floating production systems, production jackups and semi-submersibles as newbuild, conversions or refurbishment. Two major construction contracts using the dock have already been secured by Barmac and other opportunities are opening up. Meanwhile, performance improvements have also been made in the traditional business at Ardersier. (UK)

  12. RA Reactor operation and maintenance (I-IX), part VII, Task 3.08/04, Refurbishment of the RA reactor; Pogon i odrzavanje reaktora (I-IX), VII Deo, Zadatak 3.08/04 Remont reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    This volume covers the following reports concerned with the maintenance and repair work of the RA reactor: repair of the technical water system; maintenance of the transportation equipment; vacuuming and drying during refurbishment; repair and decontamination of the distillation device; and the report on participation of the operational dosimetry division in the RA reactor refurbishment activities.

  13. French experience on renewing I and C systems in NPPs. Feedback from assessing nuclear instrumentation system (RPN) refurbishment at French CP0-series plants

    International Nuclear Information System (INIS)

    Elsensohn, O.; Fradet, F.; Peron, J.C.; Soubies, B.

    2003-01-01

    In 1996, the utility operating France's nuclear power plants launched feasibility studies for the refurbishment of the nuclear instrumentation system (RPN classed category A) installed in its CPO-series (900 MWe) units. The system was ultimately upgraded with digital I and C system, using a SPINLINE 3 platform. This article describes feedback from an evaluation conducted on the refurbishment by the Institute of Radiological Protection and Nuclear Safety (IRSN), technical support arm of the Directorate General for Nuclear Safety and Radiological Protection (DGSNR). The study begins with a historical overview of the refurbishing operation, then discusses the IRSN assessment method and the lessons learned from this first major revamp of an I and C system in the French nuclear reactor series. Based on its previous experience in evaluating I and C systems for P4/P'4 (1300 MWe) and N4 (1450 MWe) plants and to account for the first-ever aspect of such an upgrade, IRSN partitioned its assessment into four phases. This approach enabled taking into account the impact of RPN refurbishment at every level - system, hardware and qualification, software, operation, onsite requalification, health physics, fire protection and human factors. All six units in the CPO series have now been equipped with the new digital RPN. (authors)

  14. Vacuuming and drying during refurbishment, Task 3.08/04-11; Podzadatak 3.08/04-11 Vakuumiranje i susenje u toku remonta

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M; Crnilovic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    The following tasks were completed during RA reactor refurbishment: vacuuming the gas system; vacuuming of the heavy water system for collecting the leftover heavy water; drying the heavy water system to remove the demineralized water; drying the distillation system; vacuuming the heavy water system before filling with heavy water; leak testing of the complete reactor system.

  15. Refurbishment of the regulating and control equipment, Task 3.08/04-05; Zadatak 3.08/04-05 Remont uredjaja za regulaciju i upravljanje

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M; Popovic, B [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    In addition to the planned refurbishment and maintenance of the RA reactor control and regulating systems, this report describes the maintenance of the reactor protection and safety systems. According to the instructions included in this report the components of these systems were tested to verify their reliability.

  16. A Closed-Loop Supply Chain under Retail Price and Quality Dependent Demand with Remanufacturing and Refurbishing

    Science.gov (United States)

    Christy, A. Y.; Fauzi, B. N.; Kurdi, N. A.; Jauhari, W. A.; Saputro, D. R. S.

    2017-06-01

    The demand of a product is linearly dependent on the retail price and quality of the product. We address a closed-loop supply chain where the manufacturer manufactures products according to the demand and sells them through a retailer in the market. A third party collects the used products from costumers and sends to the manufacturer to increase the quality. If the products can retrieve the original quality, thus the process is called remanufacturing. Not every products can retrieve the original quality, thus manufacturer refurbish this products with lower price. We construct four different scenarios - centralized and decentralized led by manufacturer, retailer, and third party. From the comparison of the result obtained in the numerical example, we conclude that the joint profit obtained under centralized, manufacturer-led, and retailer-led policies is higher than third party-led policy.

  17. A study of design features of civil works of nuclear installations facilitating their eventual refurbishing, renewal, dismantling or demolition

    International Nuclear Information System (INIS)

    Paton, A.A.; Benwell, P.; Irwin, T.F.; Hunter, I.

    1984-03-01

    This report describes a study that has been carried out to identify civil engineering features which could be incorporated in future gas cooled and light water cooled nuclear power plants to facilitate their decommissioning. The report reviews the problems likely to be met in decommissioning present day nuclear power plants and concludes that there is a number of such features which could be introduced in future designs to overcome or eliminate the problems. The report identifies and describes these features and recommends that further work be carried out to confirm their feasibility. The study briefly considered the possibility of refurbishing nuclear plants and concluded that this is not a realistic option in present circumstances. (author)

  18. The Architectural and Environmental Refurbishment of Industrialised Residential Construction. The example of the Selva Cafaro Quarter in Naples

    Directory of Open Access Journals (Sweden)

    Massimo Perriccioli

    2012-10-01

    Full Text Available This essay presents the experimental research conducted over the past years by the CHED (Concept House and Environmental Design Research Unit at the “Eduardo Vittoria” School of Architecture and Design in Ascoli Piceno, focused on the theme of Social Housing. The CHED is a temporary research team that proposes a union between diverse know-how, cultures, skills and specialisations, working towards a method of theoretical and conceptual investigation and design and building experiments in the field of innovative construction for sustainable dwelling. In particular, the experience outlined in this text relates to a design experiment completed between 2010 and 2011 and outside the borders of the Marche region, in agreement with the City of Naples' Assessorato all’Edilizia e al Centro Storico (Department of Building and the Historical Centre and focused on the architectural and environmental refurbishment of the residential quarter of Selva Cafaro in San Pietro a Patierno (Naples.

  19. Performance evaluation of operational energy use in refurbishment, reuse, and conservation of heritage buildings for optimum sustainability

    Directory of Open Access Journals (Sweden)

    O.K. Akande

    2016-09-01

    Full Text Available The operational phase of a building project has increasingly gained importance with their energy performance becoming valuable and determining their operational excellence. In most heritage building projects (HBPs, the operational energy use aspects are less considered, and a systematic way of analyzing their energy performance following project delivery is often lacking. The aim of this study is to evaluate the operational performance of refurbishment and reuse of UK listed church projects. The objective is to assess the operational energy use with a view to optimizing their sustainable performance. The methodology includes eight selected case study buildings refurbished and converted for multipurpose use. The case study approach provided qualitative insights into how the study contributes to a more structured requirements for energy management in HBPs with specific attention to energy-efficient building operations. The findings show the need to focus on fundamental areas of operational management (i.e. by developing and implementing more focused policy on operational energy performance of heritage buildings to minimize the energy required to operate them. The challenges of implementing changes in operational energy performance improvement of heritage buildings are addressed in the form of recommendations that could lead to real results. The study concludes that leveraging these areas requires commitment from all heritage building stakeholders because they all have substantial roles in harmonizing the requirement for the project׳s sustainability and not just the building operators. Meanwhile, baseline project planning, periodic updating, monitoring, and managing the energy use pattern are suggested as measures that could greatly facilitate better energy performance to optimizing their sustainable reuse compared with the traditional approach of trying to improve their thermal performance.

  20. Advanced fuel fabrication

    International Nuclear Information System (INIS)

    Bernard, H.

    1989-01-01

    This paper deals with the fabrication of advanced fuels, such as mixed oxides for Pressurized Water Reactors or mixed nitrides for Fast Breeder Reactors. Although an extensive production experience exists for the mixed oxides used in the FBR, important work is still needed to improve the theoretical and technical knowledge of the production route which will be introduced in the future European facility, named Melox, at Marcoule. Recently, the feasibility of nitride fuel fabrication in existing commercial oxide facilities was demonstrated in France. The process, based on carbothermic reduction of oxides with subsequent comminution of the reaction product, cold pressing and sintering provides (U, Pu)N pellets with characteristics suitable for irradiation testing. Two experiments named NIMPHE 1 and 2 fabricated in collaboration with ITU, Karlsruhe, involve 16 nitride and 2 carbide pins, operating at a linear power of 45 and 73 kW/m with a smear density of 75-80% TD and a high burn-up target of 15 at%. These experiments are currently being irradiated in Phenix, at Marcoule. (orig.)

  1. An Ethology of Urban Fabric(s)

    DEFF Research Database (Denmark)

    Fritsch, Jonas; Thomsen, Bodil Marie Stavning

    2014-01-01

    The article explores a non-metaphorical understanding of urban fabric(s), shifting the attention from a bird’s eye perspective to the actual, textural manifestations of a variety of urban fabric(s) to be studied in their real, processual, ecological and ethological complexity within urban life. We...... effectuate this move by bringing into resonance a range of intersecting fields that all deal with urban fabric(s) in complementary ways (interaction design and urban design activism, fashion, cultural theory, philosophy, urban computing)....

  2. Report on participation of the operational dosimetry division in refurbishment of the RA reactor, Task 3.08/04-13; Podzadatak 3.08/04-13 Izvestaj o ucescu Odseka operativne dozimetrije RZ u remontnim radovima na Reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During the refurbishment of the RA reactor, from January to June 1963 the division of operational division had a very important role and comprehensive tasks. To enable safety of the staff it was necessary to provide protection clothes, personnel dosemeters; permanent monitoring of radiation doses; strict control of the procedures for completing the planned maintenance and repair operations to avoid contamination of the personnel and working space. The refurbishment activities described in this report are: removal of fuel from the core; refurbishment of the heavy water system; decontamination of the distillation equipment; repair of the gas system.

  3. Refurbishment of isolation room and development of glove box for the DUPIC project in IMEF

    International Nuclear Information System (INIS)

    Baek, S. Y.; Park, J. J.; Lee, H. H.; Hong, K. P.; Yang, M. S.; Min, D. K.

    2001-01-01

    To perform R and D of DUPIC (Direct Use of Spent PWR Fuel in CANDU Reactors), the high-radioactive shielding facility is necessary. IMEF(Irradiated Material Examination Facility) in KAERI has the high-radioactive shielding facility and some R and D such that the spent PWR fuel can be burned again in a PHWR by direct re-fabrication into CANDU-compatible DUPIC fuel bundles, is being carried out using the manipulator attached to the hotcell-M6. Although many testing equipment are located and are being operated in hotcell, it is not possible to work personally inside the hotcell due to the high radioactive contaminant. When they are out of order, the cleaned one can be maintained and repaired using the renovated isolation room located over the hotcell-M6 and the new devised glove box located at service area. Some lead-sheets and the lead glasses were fixed on the wall of the isolation room to improve the shielding capability and the roof door of hotcell-M6 can be open remotely. To maintain and repair the equipment of hotcell, a working desk was constructed in the isolation room. The glove box was also made to withdraw the disordered equipment of hotcell through the rear door

  4. Swift fabrication of Ag nanostructures using a colloidal solution of Holostemma ada-kodien (Apocynaceae) - Antibiofilm potential, insecticidal activity against mosquitoes and non-target impact on water bugs.

    Science.gov (United States)

    Alyahya, Sami A; Govindarajan, Marimuthu; Alharbi, Naiyf S; Kadaikunnan, Shine; Khaled, Jamal M; Mothana, Ramzi A; Al-Anbr, Mohammed N; Vaseeharan, Baskaralingam; Ishwarya, Ramachandran; Yazhiniprabha, Mariappan; Benelli, Giovanni

    2018-04-01

    Recent research in entomology and parasitology focused on the efficacy of green fabricated nanomaterials as novel insecticides. In this study, we synthesized poly-dispersed and stable silver nanoparticles (AgNPs) using the leaf extract of Holostemma ada-kodien. The nanostructures were characterized by ultraviolet-visible spectroscopy, Fourier-transform infrared spectroscopy, scanning electron microscopy, transmission electron microscopy, energy dispersive X-ray, and X-ray diffraction analysis. The efficacy of H. ada-kodien leaf extract and AgNPs in vector control was evaluated against the mosquitoes Anopheles stephensi, Aedes aegypti, and Culex quinquefasciatus, which act as major vectors of important parasitic and arboviral diseases. AgNPs showed higher toxicity if compared to the H. ada-kodien leaf aqueous extract, LC 50 towards larvae of A. stephensi, A. aegypti, and C. quinquefasciatus were 12.18, 13.30, and 14.70 μg/mL, respectively. When the AgNPs were tested on non-target water bugs, Diplonychus indicus, the LC 50 value was 623.48 μg/mL. Furthermore, 100 μl/mL of AgNPs achieved significant antimicrobial activity against Bacillus pumilus, Enterococcus faecalis, Pseudomonas aeruginosa, Proteus vulgaris, and Candida albicans. Light and confocal laser scanning microscopy highlighted a major impact of the H. ada-kodien-synthesized AgNPs on the external topography and architecture of microbial biofilms, both on Gram-positive and Gram-negative bacteria. Overall, this study sheds light on the insecticidal and antibiofilm potential of H. ada-kodien-synthesized AgNPs, a potential green resource for the rapid synthesis of polydispersed and highly stable AgNPs. Copyright © 2018 Elsevier B.V. All rights reserved.

  5. Investigating the business case for a zero-energy refurbishment of residential buildings by applying a pre-fabricated façade module

    NARCIS (Netherlands)

    Azcarate Aguerre, J.F.; Konstantinou, T.; Klein, T.; Steensma, S.; Guerra Santin, O.; Silvester, S.; Laitinen Lindström, Therese; Blume, Ylva; Regebro, Margareta; Hampus, Nina; Hiltunen, Vanja

    2017-01-01

    The ambition to renovate the post-war building stock to an energy-neutral quality is getting a lot of attention from social housing corporations and other institutional owners, financial organizations, and users. An effective renovation plan must significantly improve the current energy performance

  6. Fabrication and Prototyping Lab

    Data.gov (United States)

    Federal Laboratory Consortium — Purpose: The Fabrication and Prototyping Lab for composite structures provides a wide variety of fabrication capabilities critical to enabling hands-on research and...

  7. Fabrication of recyclable superhydrophobic cotton fabrics

    Science.gov (United States)

    Han, Sang Wook; Park, Eun Ji; Jeong, Myung-Geun; Kim, Il Hee; Seo, Hyun Ook; Kim, Ju Hwan; Kim, Kwang-Dae; Kim, Young Dok

    2017-04-01

    Commercial cotton fabric was coated with SiO2 nanoparticles wrapped with a polydimethylsiloxane (PDMS) layer, and the resulting material surface showed a water contact angle greater than 160°. The superhydrophobic fabric showed resistance to water-soluble contaminants and maintained its original superhydrophobic properties with almost no alteration even after many times of absorption-washing cycles of oil. Moreover, superhydrophobic fabric can be used as a filter to separate oil from water. We demonstrated a simple method of fabrication of superhydrophobic fabric with potential interest for use in a variety of applications.

  8. Products, practices and processes: exploring the innovation potential for low-carbon housing refurbishment among small and medium-sized enterprises (SMEs) in the UK construction industry

    International Nuclear Information System (INIS)

    Killip, Gavin

    2013-01-01

    Scenario-based studies agree that the technical potential for CO 2 emissions reduction from the housing stock is large. This paper explores how a market might be developed for the refurbishment activities assumed in these scenarios, taking the existing market for repair, maintenance and improvement (RMI) as its starting point. Interviews with 16 small and medium-sized enterprises (SMEs) in the construction industry reveal the interdependence of products, practices and processes in housing renovation activities. Conservative practice as well as innovation can be understood as the outcome of multi-lateral influences on firms from other firms, clients, the material buildings and products in their working lives, and from regulations and regulators. Contractors' openness to innovation is contingent on an informal approach to risk assessment, taking account of cost, time efficiency, client demands, and installer confidence in the reliability of the resulting work. The implications of the research are discussed in relation to the need for new practices and processes on refurbishment projects, raising questions for future research on key questions of quality assurance, performance over time, the application of standards, and vocational training. -- Highlights: •Repair, maintenance and improvement works are triggers for low-carbon refurbishment. •Millions of property owners and small firms make for fragmented decision-making. •Actor-Network Theory is used to frame decision-making processes for refurbishment. •Small builders can be innovative if clients allow time and money for experimentation. •Energy policy for existing homes needs to engage with the construction sector

  9. Task 3.08/04-04, refurbishment of the dosimetry control equipment; Zadatak 3.08/04-04 Remont uredjaja dozimetrijske kontrole

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M; Milosevic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During three years of operation the designed RA dosimetry system showed satisfactory performance. During the period planned for maintenance and refurbishment of the RA reactor the functionality of the dosimetry system was tested and verified, the components were cleaned and calibrated. The system was operated for 24 hours for testing the reliability of components and whole system. This report describes detailed instructions and actions performed for these activities.

  10. Point Lepreau Refurbishment Project. Programmable digital comparator (PDC) replacement for SDS1 and SDS2 - update 1

    International Nuclear Information System (INIS)

    Fraser, K.G.; Ichiyen, N.M.; Condor, A.E.; Thompson, P.D.

    2005-01-01

    NB Power is tentatively planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station starting in April 2008. The scope of the outage was determined from the outcome of a two year study (Phase 1) involving a detailed condition assessment of the station which examined issues relating to ageing and obsolescence, along with a detailed review of Safety and Licensing issues associated with extended operation. In order to minimize schedule and regulatory risk for the Refurbishment project, pre-project work was initiated in early 2002. This program is called Phase 2 ESA (Early Start Activities). As part of the Phase 1 assessments it was concluded that replacement of the Programmable Digital Comparators for both shutdown systems was required in order to ensure operation of the plant for a further 25-30 years. Critical tasks were identified related to PDC replacement as part of the Phase 2 ESA program. This paper describes the progress of the Phase 2 ESA program as well as the planned future (Phase 2) work for the PDC replacement for both shutdown systems. (author)

  11. Does demolition or refurbishment of old and inefficient homes help to increase our environmental, social and economic viability?

    International Nuclear Information System (INIS)

    Power, Anne

    2008-01-01

    The issue of whether to demolish or refurbish older housing has been debated for over a century. It has been an active policy area since the late 1880s, when the Government first authorised the statutory demolition of insanitary slums. In the 1960s, revulsion at the scale of 'demolition blight' and new building caused a rethink, leading to a major reinvestment in inner city neighbourhoods of older housing. In the past 5 years, debate on demolition and new building has been intensified by the Government's Sustainable Communities Plan of 2003, with its proposals for large-scale clearance and building. Environmental arguments about renovating the existing stock have gained increasing prominence as people have sought to defend their communities from demolition. The evidence on whether demolition would reduce the amount of greenhouse gases we emit into the atmosphere is unclear and disputed. This paper summarises the evidence and arguments, and attempts to clarify the most realistic, achievable route to major reductions in energy use in homes

  12. Optimal and Sustainable Plant Refurbishment in Historical Buildings: A Study of an Ancient Monastery Converted into a Showroom in Florence

    Directory of Open Access Journals (Sweden)

    Carla Balocco

    2013-04-01

    Full Text Available The aim of this research is to study the possibility and sustainability of retrofit and refurbishment design solutions on historical buildings converted to different uses and often clashing with their original purpose and architectural features. The building studied is an ancient monastery located in the historical center of Florence (Italy. Today the original cloister is covered over by a single glazed pitched roof and used as a fashion showroom. Our proposed solution concerns a reversible and sustainable plant design integrated with an active transparent building casing. The existing glazed pitched roof was reconsidered and re-designed as part of the existing heating, ventilation and air conditioning (HVAC plant system, based on the functioning of an active thermal buffer to control the high heat flow rates and external thermal loads due to solar radiation. Hourly whole building energy analysis was carried out to check the effectiveness and energy sustainability of our proposed solution. Results obtained showed, from the historical-architectural, energy and environmental points of view, its sustainability due to the building-plant system integration and interaction with its location, the external climatic conditions and defined expected uses, in particular with reference to indoor thermal comfort.

  13. Does demolition or refurbishment of old and inefficient homes help to increase our environmental, social and economic viability?

    Energy Technology Data Exchange (ETDEWEB)

    Power, Anne [London School of Economics, Houghton Street, London WC2A 2AE (United Kingdom); Sustainable Development Commission, Room 101, 55 Whitehall, c/o 3-8 Whitehall Place, London SW1A 2HH (United Kingdom)

    2008-12-15

    The issue of whether to demolish or refurbish older housing has been debated for over a century. It has been an active policy area since the late 1880s, when the Government first authorised the statutory demolition of insanitary slums. In the 1960s, revulsion at the scale of 'demolition blight' and new building caused a rethink, leading to a major reinvestment in inner city neighbourhoods of older housing. In the past 5 years, debate on demolition and new building has been intensified by the Government's Sustainable Communities Plan of 2003, with its proposals for large-scale clearance and building. Environmental arguments about renovating the existing stock have gained increasing prominence as people have sought to defend their communities from demolition. The evidence on whether demolition would reduce the amount of greenhouse gases we emit into the atmosphere is unclear and disputed. This paper summarises the evidence and arguments, and attempts to clarify the most realistic, achievable route to major reductions in energy use in homes. The arguments that apply to housing also apply to most other buildings and therefore to the overall built environment, which accounts for half of all carbon emissions. Three main sources of evidence have helped in the development of this paper, but there are many other studies we draw on in the discussion.

  14. Polymorphous computing fabric

    Science.gov (United States)

    Wolinski, Christophe Czeslaw [Los Alamos, NM; Gokhale, Maya B [Los Alamos, NM; McCabe, Kevin Peter [Los Alamos, NM

    2011-01-18

    Fabric-based computing systems and methods are disclosed. A fabric-based computing system can include a polymorphous computing fabric that can be customized on a per application basis and a host processor in communication with said polymorphous computing fabric. The polymorphous computing fabric includes a cellular architecture that can be highly parameterized to enable a customized synthesis of fabric instances for a variety of enhanced application performances thereof. A global memory concept can also be included that provides the host processor random access to all variables and instructions associated with the polymorphous computing fabric.

  15. Pickering NGS A reactor building 1 dome refurbishment long-term monitoring of coating

    International Nuclear Information System (INIS)

    Deans, J.J.; Chan, P.; Gomme, R.

    2006-01-01

    'Full text:' To reduce air leakage through the dome of Pickering NGS A Reactor Building 1, in August 1993 a portion of the exterior concrete surface was coated with a single component elastomeric polyurethane material. An internal positive pressure test of the building, conducted between November 5 and 7, 1993, found that the air leakage rates were significantly lower in this test than leakage rates which had been measured during a pressure test conducted in 1992. This reduction in leakage was attributed to the successful performance of the coating. The need for a high-performance, elastomeric surface coating was identified for reduction of air leakage levels through the dome of Reactor Building l of Ontario Power Generation's (formerly Ontario Hydro's) Pickering 'A' Nuclear Generating Station near Toronto. A number of candidate coatings were extensively tested to assess the performance characteristics and identify a material that could withstand the elements and perform effectively for around 20 years. Under normal operating conditions, a licensing limit of 2.7% of contained mass/hour is set for permissible containment leakage whilst the operational working target is less than 1%. The facility's engineers determined that any leakages were pressure-dependent, so in an effort to remain well within their working target, they sought a system that would bridge and seal any hairline cracks in the concrete dome and thereby prevent the passage of gas or vapour through the substrate. On the basis of scheduling and cost, they concluded that a high performance coating was most appropriate for the project, and hired Kinectrics (formerly Ontario Hydro Technologies (OHT)) to select, test, assess and arrange for the application to the RB 1 Dome. In all, nearly 70 separate manufacturers were approached by Kinectrics with a view to obtaining recommendations for treatment. The respective performance data of the respondents' products were compared with a set of specific design

  16. The effect of refurbishing a UK steel plant on PM10 metal composition and ability to induce inflammation

    Directory of Open Access Journals (Sweden)

    Maynard Robert L

    2005-05-01

    Full Text Available Abstract Background In the year 2000 Corus closed its steel plant operations in Redcar, NE of England temporarily for refurbishment of its blast furnace. This study investigates the impact of the closure on the chemical composition and biological activity of PM10 collected in the vicinity of the steel plant. Methods The metal content of PM10 samples collected before during and after the closure was measured by ICP-MS in order to ascertain whether there was any significant alteration in PM10 composition during the steel plant closure. Biological activity was assessed by instillation of 24 hr PM10 samples into male Wistar rats for 18 hr (n = 6. Inflammation was identified by the cellular and biochemical profile of the bronchoalveolar lavage fluid. Metal chelation of PM10 samples was conducted using Chelex beads prior to treatment of macrophage cell line, J774, in vitro and assessment of pro-inflammatory cytokine expression. Results The total metal content of PM10 collected before and during the closure period were similar, but on reopening of the steel plant there was a significant 3-fold increase (p 10 collected during the reopened period, as well as significant increases in albumin (p 10 from the pre-closure and closure periods did not induce any significant alterations in inflammation or lung damage. The soluble and insoluble extractable PM10 components washed from the reopened period both induced a significant increase in neutrophil cell number (p 10 from the re-opened period stimulated J774 macrophages to generate TNF-α protein and this was significantly prevented by chelating the metal content of the PM10 prior to addition to the cells. Conclusion PM10-induced inflammation in the rat lung was related to the concentration of metals in the PM10 samples tested, and activity was found in both the soluble and insoluble fractions of the particulate pollutant.

  17. Refurbishment priorities at the Russian coal-fired power sector for cleaner energy production-Case studies

    International Nuclear Information System (INIS)

    Grammelis, P.; Koukouzas, N.; Skodras, G.; Kakaras, E.; Tumanovsky, A.; Kotler, V.

    2006-01-01

    The paper aims to present the current status of the coal-fired power sector in Russia, the prospects for renovation activities based on Clean Coal Technologies (CCT) and two case studies on potential refurbishment projects. Data were collected for 180 thermoelectric units with capacity higher than 100 MWe and the renovation needs of the power sector, among the retrofitting, repowering and reconstruction options, were estimated through a multi-criteria analysis. The most attractive system to renovate a power plant between the Supercritical Combustion (SC) and the Fluidized Bed Combustion (FBC) technologies was evaluated. The application of each of the aforementioned technologies at the Kashirskaya and Shaturskaya power plants was studied and their replication potential in the Russian coal-fired power plant park was examined. Nowadays, the installed capacity of coal-fired power plants in the Russian Federation is 29.3 GWe, while they account for about 19% of the total electricity generation in the area. The low efficiency and especially the advanced age are the determinant factors for renovation applications at the Russian units. Even in the more conservative modernization scenario, over 30% of the thermoelectric units have to be repowered or reconstructed. Concrete proposals about the profitable and reliable operation of two Russian thermoelectric units with minimized environmental effects were elaborated. A new unit of 315 MWe with supercritical steam parameters and reburning for NO x abatement is envisaged to upgrade Unit 1 of Kashirskaya power station, while new Circulating Fluidized Bed (CFB) boilers of the same steam generation is the most promising renovation option for the boilers of Unit 1 in Shaturskaya power station

  18. Refurbishment priorities at the Russian coal-fired power sector for cleaner energy production-Case studies

    Energy Technology Data Exchange (ETDEWEB)

    Grammelis, P. [Centre for Research and Technology Hellas/Institute of Solid Fuels Technology and Applications (CERTH/ISFTA), 4 km N.R. Ptolemaida-Kozani, P.O. Box 95, Ptolemaida 50200 (Greece) and Laboratory of Steam Boilers and Thermal Plants, Mechanical Engineering Department, National Technical University of Athens, Athens (Greece)]. E-mail: pgra@central.ntua.gr; Koukouzas, N. [Centre for Research and Technology Hellas/Institute of Solid Fuels Technology and Applications (CERTH/ISFTA), 4 km N.R. Ptolemaida-Kozani, P.O. Box 95, Ptolemaida 50200 (Greece); Skodras, G. [Centre for Research and Technology Hellas/Institute of Solid Fuels Technology and Applications (CERTH/ISFTA), 4 km N.R. Ptolemaida-Kozani, P.O. Box 95, Ptolemaida 50200 (Greece); Kakaras, E. [Centre for Research and Technology Hellas/Institute of Solid Fuels Technology and Applications (CERTH/ISFTA), 4 km N.R. Ptolemaida-Kozani, P.O. Box 95, Ptolemaida 50200 (Greece); Laboratory of Steam Boilers and Thermal Plants, Mechanical Engineering Department, National Technical University of Athens, Athens (Greece); Tumanovsky, A. [VTI All Russia Thermal Engineering Institute (Russian Federation); Kotler, V. [VTI All Russia Thermal Engineering Institute (Russian Federation)

    2006-11-15

    The paper aims to present the current status of the coal-fired power sector in Russia, the prospects for renovation activities based on Clean Coal Technologies (CCT) and two case studies on potential refurbishment projects. Data were collected for 180 thermoelectric units with capacity higher than 100 MWe and the renovation needs of the power sector, among the retrofitting, repowering and reconstruction options, were estimated through a multi-criteria analysis. The most attractive system to renovate a power plant between the Supercritical Combustion (SC) and the Fluidized Bed Combustion (FBC) technologies was evaluated. The application of each of the aforementioned technologies at the Kashirskaya and Shaturskaya power plants was studied and their replication potential in the Russian coal-fired power plant park was examined. Nowadays, the installed capacity of coal-fired power plants in the Russian Federation is 29.3 GWe, while they account for about 19% of the total electricity generation in the area. The low efficiency and especially the advanced age are the determinant factors for renovation applications at the Russian units. Even in the more conservative modernization scenario, over 30% of the thermoelectric units have to be repowered or reconstructed. Concrete proposals about the profitable and reliable operation of two Russian thermoelectric units with minimized environmental effects were elaborated. A new unit of 315 MWe with supercritical steam parameters and reburning for NO {sub x} abatement is envisaged to upgrade Unit 1 of Kashirskaya power station, while new Circulating Fluidized Bed (CFB) boilers of the same steam generation is the most promising renovation option for the boilers of Unit 1 in Shaturskaya power station.

  19. Estimation of radiation exposure for hot cell workers during DUPIC fuel fabrication process in IMEF M6 cell

    Energy Technology Data Exchange (ETDEWEB)

    Jeon, Yong Bum; Baek, Sang Yeol; Park, Dae Kyu

    1997-06-01

    DUPIC(Direct Use of spent PWR fuel In CANDU) fuel cycle to utilize the PWR spent fuel in fabricating CANDU fuel, which is expected to reduce not only the total amount of high level radwastes but the energy sources is underway. IMEF M6 cell to be used as DUPIC fuel fabrication facility is refurbished and retrofitted. Radiation exposure for the hot cell worker by dispersion of the radioactive materials during the DUPIC process were estimated on the basis of the hot cell design information. According to the estimation results, DUPIC fuel fabrication process could be run without any severe impacts to the hot cell workers when the ventilation system to maintain the sufficient pressure difference between hotcell and working area and radiation monitoring system is supports the hot cell operation properly. (author). 4 tabs., 6 figs.

  20. Social House Refurbishment

    OpenAIRE

    DONET CLIMENT, MARIA

    2012-01-01

    The building is located in urban Horsens on CHR. M. Østergaardsvej. Originally it was designed as part of a bigger social housing project and executed in 1956 by architect J. Broch Christensen. The project consisted of 7 very similar blocks but we are mainly focusing on block 6. The original design of the buildings was a traditional danish design with external bricks and roof tiles - all in red. Inside, the apartments were quite typical of that time. Our concept for the new building is to m...

  1. Fabrication of targets for transmutation of americium : synthesis of inertial matrix by sol-gel method. Procedure study on the infiltration of a radioactive solutions; Fabricacion de blancos para la transmutacion de americio: sintesis de matrices inertes por el metodo sol-gel. Estudio del procedimiento de infiltracion de disoluciones radiactivas

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez Carretero, A [Universidad Complutense de Madrid (Spain)

    2002-07-01

    Transmutation and incineration are innovative options in the management and disposal of fission products and actinides. nevertheless, the fabrication of targets for transmutation and incineration of actinides and fission products require a reconsideration of conventional processes (mechanical blending) and the development of new procedures compatible with the high activity of these materials. This work presents th R and D of a new fabrication method called INRAM (Infiltration of Radioactive Materials) based on the infiltration of an actinide solution in a porous non radiotoxic material in the form of a pellet (up to 12% An), or beads (up to 40% An) produced by sol-gel. The first method have been used for the fabrication of spinel (MgAl{sub 2}O{sub 4}) targets containing 11% Am, which have been irradiated in HFR-Petten (358.4 full power days). Post-test burn-up calculations showed that at the end of the irradiation the initial Am-241 concentration was reduced to 4%. The fraction of the initial americum atoms that have been fissioned is 28%. The main advantage of the INRAM method is that matrices with low or zero activity can be fabricated and formed into the required shape in an unshielded facility. This method offers other advantages over conventional ones, such as the active wastes are reduced, is easy to automate, adoptable to telemanipulation and dust free, which facilitate operator intervention and minimise radiation exposure to the personal. In addition, the infiltrant needs only be present in liquid form, i. e. it could be transferred directly from the reprocessing plant for fabrication into targets without conversion into-solid form. In order to optimise the infiltration process in depth investigations of all important process parameters, e. g. infiltration kinetics and metal (pu, Am) concentration in the feed solution, and also on extensive study or powder metallurgy parameters for the preparation of high quality fuel pellets with a high density, have been

  2. Targets development at Sandia National Laboratories

    International Nuclear Information System (INIS)

    Smith, M.L.; Hebron, D.; Derzon, M.; Olson, R.; Alberts, T.

    1997-01-01

    For many years, Sandia National Laboratories under contract to the Department of Energy has produced targets designed to understand complex ion beam and z-pinch plasma physics. This poster focuses on the features of target designs that make them suitable for Z-pinch plasma physics applications. Precision diagnostic targets will prove critical in understanding the plasma physics model needed for future ion beam and z-pinch design. Targets are designed to meet specific physics needs; in this case the authors have fabricated targets to maximize information about the end-on versus side-on x-ray emission and z-pinch hohlraum development. In this poster, they describe the fabrication and characterization techniques. They include discussion of current targets under development as well as target fabrication capabilities. Advanced target designs are fabricated by Sandia National Laboratories in cooperation with General Atomics of San Diego, CA and W.J. Schafer Associates, Inc. of Livermore, CA

  3. Project and supply agreement. The text of the agreement of 15 January 1993 between the International Atomic Energy Agency and the Government of the Republic of Indonesia and the Government of the United States of America concerning the transfer of enriched uranium for the fabrication of targets for the production of radioisotopes for medical purposes

    International Nuclear Information System (INIS)

    1994-08-01

    The text of the Project and Supply Agreement, which was approved by the Agency's Board of Governors on 4 December 1992 and concluded on 15 January 1993 between the Agency and the Governments of the Republic of Indonesia and the United States of America for the transfer of enriched uranium for the fabrication of targets for the production of radioisotopes for medical purposes is reproduced herein for the information of all Members. The agreement entered into force on 15 January 1993, pursuant to Article XII.1

  4. Current progress in NIF target concepts

    International Nuclear Information System (INIS)

    Gobby, P.L.; Foreman, L.R.; Thoma, D.J.; Jacobson, L.A.; Hollis, R.V.; Barrera, J.; Mitchell, M.A.; Salazar, M.A.; Salzer, L.J.

    1996-01-01

    Target concepts for the National Ignition Facility (NIF) require progress in the art and science of target fabrication. Three distinct issues are addressed: beryllium fuel capsules, foam-buffered direct drive, and high-density gas-filled hohlraums. In all cases experiments on the existing Nova laser at LLNL are either in progress or planned for the near future to test the various concepts. Consequently, target fabrication must be able to deliver targets appropriate for each

  5. Fabrication and calibration of FORTIS

    Science.gov (United States)

    Fleming, Brian T.; McCandliss, Stephan R.; Kaiser, Mary Elizabeth; Kruk, Jeffery; Feldman, Paul D.; Kutyrev, Alexander S.; Li, Mary J.; Rapchun, David A.; Lyness, Eric; Moseley, S. H.; Siegmund, Oswald; Vallerga, John; Martin, Adrian

    2011-09-01

    The Johns Hopkins University sounding rocket group is entering the final fabrication phase of the Far-ultraviolet Off Rowland-circle Telescope for Imaging and Spectroscopy (FORTIS); a sounding rocket borne multi-object spectro-telescope designed to provide spectral coverage of 43 separate targets in the 900 - 1800 Angstrom bandpass over a 30' x 30' field-of- view. Using "on-the-fly" target acquisition and spectral multiplexing enabled by a GSFC microshutter array, FORTIS will be capable of observing the brightest regions in the far-UV of nearby low redshift (z ~ 0.002 - 0.02) star forming galaxies to search for Lyman alpha escape, and to measure the local gas-to-dust ratio. A large area (~ 45 mm x 170 mm) microchannel plate detector built by Sensor Sciences provides an imaging channel for targeting flanked by two redundant spectral outrigger channels. The grating is ruled directly onto the secondary mirror to increase efficiency. In this paper, we discuss the recent progress made in the development and fabrication of FORTIS, as well as the results of early calibration and characterization of our hardware, including mirror/grating measurements, detector performance, and early operational tests of the microshutter arrays.

  6. Management of unconverted light for the National Ignition Facility target chamber

    International Nuclear Information System (INIS)

    Anderson, A. T.; Bletzer, K.; Burnham, A. K.; Dixit, S.; Genin, F. Y.; Hibbard, W.; Norton, J.; Scott, J. M.; Whitman, P. K.

    1998-01-01

    The NIF target chamber beam dumps must survive high x-ray, laser, ion, and shrapnel exposures without excessive generation of vapors or particulate that will contaminate the final optics debris shields, thereby making the debris shields susceptible to subsequent laser damage. The beam dumps also must be compatible with attaining and maintaining the required target chamber vacuum and must not activate significantly under high neutron fluxes. Finally, they must be developed, fabricated, and maintained for a reasonable cost. The primary challenge for the beam dump is to survive up to 20 J/cm 2 of lpm light and 1 - 2 J/cm 2 of nominally 200 - 350 eV blackbody temperature x rays. Additional threats include target shrapnel, and other contamination issues. Designs which have been evaluated include louvered hot-pressed boron carbide (B 4 C) or stainless steel (SS) panels, in some cases covered with transparent Teflon film, and various combinations of inexpensive low thermal expansion glasses backed by inexpensive absorbing glass. Louvered designs can recondense a significant amount of ablated material that would otherwise escape into the target chamber. Transparent Teflon was evaluated as an alternative way to capture ablated material. The thin Teflon sheet would need to be replaced after each shot since it exhibits both laser damage and considerable x- ray ablation with each shot. Uncontaminated B 4 C, SS, and low thermal expansion glasses have reasonably small x-ray and laser ablation rates, although the glasses begin to fail catastrophically after 100 high fluence shots. Commercially available absorbing glasses require a pre-shield of either Teflon or low thermal expansion glass to prevent serious degradation by the x-ray fluence. Advantages of the hot-pressed B 4 C and SS over glass are their performance against microshrapnel, their relative indifference to contamination, and their ability to be refurbished by aggressive cleaning using CO 2 pellets, glass beads, high

  7. Fabric based supercapacitor

    International Nuclear Information System (INIS)

    Yong, S; Tudor, M J; Beeby, S P; Owen, J R

    2013-01-01

    Flexible supercapacitors with electrodes coated on inexpensive fabrics by the dipping technique. This paper present details of the design, fabrication and characterisation of fabric supercapacitor. The sandwich structured supercapacitors can achieve specific capacitances of 11.1F/g, area capacitance 105 mF.cm −2 and maintain 95% of the initial capacitance after cycling the device for more than 15000 times

  8. Fabrics in Function

    DEFF Research Database (Denmark)

    Bang, Anne Louise

    2007-01-01

    sensing of fabrics in function. It is proposed that tactile and visual sensing of fabrics is a way to investigate and express emotional utility values. The further purpose is to use experiments with repertory grid models as part of the mapping of the entire research project and also as a basis...

  9. Fabricating architectural volume

    DEFF Research Database (Denmark)

    Feringa, Jelle; Søndergaard, Asbjørn

    2015-01-01

    The 2011 edition of Fabricate inspired a number of collaborations, this article seeks to highlight three of these. There is a common thread amongst the projects presented: sharing the ambition to close the rift between design and fabrication while incorporating structural design aspects early on...

  10. Smart Fabrics Technology Development

    Science.gov (United States)

    Simon, Cory; Potter, Elliott; Potter, Elliott; McCabe, Mary; Baggerman, Clint

    2010-01-01

    Advances in Smart Fabrics technology are enabling an exciting array of new applications for NASA exploration missions, the biomedical community, and consumer electronics. This report summarizes the findings of a brief investigation into the state of the art and potential applications of smart fabrics to address challenges in human spaceflight.

  11. Optics fabrication technical challenges

    International Nuclear Information System (INIS)

    Chabassier, G.; Ferriou, N.; Lavastre, E.; Maunier, C.; Neauport, J.; Taroux, D.; Balla, D.; Fornerod, J.C.

    2004-01-01

    Before the production of all the LMJ (MEGAJOULE laser) optics, the CEA had to proceed with the fabrication of about 300 large optics for the LIL (laser integration line) laser. Thanks to a fruitful collaboration with high-tech optics companies in Europe, this challenge has been successfully hit. In order to achieve the very tight requirements for cleanliness, laser damage threshold and all the other high demanding fabrication specifications, it has been necessary to develop and to set completely new fabrication process going and to build special outsize fabrication equipment. Through a couple of examples, this paper gives an overview of the work which has been done and shows some of the results which have been obtained: continuous laser glass melting, fabrication of the laser slabs, rapid-growth KDP (potassium dihydrogen phosphate) technology, large diffractive transmission gratings engraving and characterization. (authors)

  12. Investigation on shortening fabrication process of instrumented irradiation capsule of JMTR

    International Nuclear Information System (INIS)

    Nagata, Hiroshi; Inoue, Shuichi; Yamaura, Takayuki; Tsuchiya, Kunihiko; Nagao, Yoshiharu

    2013-06-01

    Refurbishment of The Japan Materials Testing Reactor (JMTR) was completed in FY2010. For damage caused by the 2011 off the Pacific coast of Tohoku Earthquake, the repair of facilities was completed in October 2012. Currently, the JMTR is in preparation for restart. Irradiation tests for LWRs safety research, science and technologies and production of RI for medical diagnosis medicine, etc. are expected after the JMTR restart. On the other hand, aiming at the attractive irradiation testing reactor, the usability improvement has been discussed. As a part of the usability improvement, shortening of turnaround time to get irradiation results from an application for irradiation use was discussed focusing on the fabrication process of irradiation capsules, where the fabrication process was analyzed and reviewed by referring a trial fabrication of the mockup capsule. As a result, it was found that the turnaround time can be shortened 2 months from fabrication period of 6 months with communize of irradiation capsule parts, application of ready-made instrumentation including the sheath heater, reconsideration of inspection process, etc. (author)

  13. New polymorphous computing fabric

    International Nuclear Information System (INIS)

    Wolinski, Christophe; Gokhale, Maya; McCabe, Kevin P.

    2002-01-01

    This paper introduces a new polymorphous computing Fabric well suited to DSP and Image Processing and describes its implementation on a Configurable System on a Chip (CSOC). The architecture is highly parameterized and enables customization of the synthesized Fabric to achieve high performance for a specific class of application. For this reason it can be considered to be a generic model for hardware accelerator synthesis from a high level specification. Another important innovation is the Fabric uses a global memory concept, which gives the host processor random access to all the variables and instructions on the Fabric. The Fabric supports different computing models including MIMD, SPMD and systolic flow and permits dynamic reconfiguration. We present a specific implementation of a bank of FIR filters on a Fabric composed of 52 cells on the Altera Excalibur ARM running at 33 MHz. The theoretical performance of this Fabric is 1.8 GMACh. For the FIR application we obtain 1.6 GMAC/s real performance. Some automatic tools have been developed like the tool to provide a host access utility and assembler.

  14. RA Reactor operation and maintenance (I-IX), part VI, Task 3.08/04, Refurbishment of the RA reactor; Pogon i odrzavanje reaktora (I-IX), VI Deo, Zadatak 3.08/04 Remont reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During the period planned for maintenance and refurbishment of the RA reactor the gas reactor system including the ventilation system was inspected and tested, the components were cleaned. This report describes detailed instructions and actions concerning repair and decontamination of the gas and ventilation systems components.

  15. Fabrication and characterisation of fabric supercapacitor

    OpenAIRE

    Yong, Sheng

    2016-01-01

    Fabric supercapacitor is a flexible electrochemical device for energy storage application. It is designed to power up flexible electronic systems used for, for example, information sensing, data computation and communication. The development of a flexible supercapacitor is important for e-textiles since supercapacitor can achieve higher energy density than a standard parallel plate capacitor and a larger power density compared with a battery. This research area is currently facing barriers on...

  16. Junction and circuit fabrication

    International Nuclear Information System (INIS)

    Jackel, L.D.

    1980-01-01

    Great strides have been made in Josephson junction fabrication in the four years since the first IC SQUID meeting. Advances in lithography have allowed the production of devices with planar dimensions as small as a few hundred angstroms. Improved technology has provided ultra-high sensitivity SQUIDS, high-efficiency low-noise mixers, and complex integrated circuits. This review highlights some of the new fabrication procedures. The review consists of three parts. Part 1 is a short summary of the requirements on junctions for various applications. Part 2 reviews intergrated circuit fabrication, including tunnel junction logic circuits made at IBM and Bell Labs, and microbridge radiation sources made at SUNY at Stony Brook. Part 3 describes new junction fabrication techniques, the major emphasis of this review. This part includes a discussion of small oxide-barrier tunnel junctions, semiconductor barrier junctions, and microbridge junctions. Part 3 concludes by considering very fine lithography and limitations to miniaturization. (orig.)

  17. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  18. Experimental Fabrication Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Provides aviation fabrication support to special operations aircraft residing at Fort Eustis and other bases in the United States. Support is also provided to AATD...

  19. Alloy Fabrication Laboratory

    Data.gov (United States)

    Federal Laboratory Consortium — At NETL’s Alloy Fabrication Facility in Albany, OR, researchers conduct DOE research projects to produce new alloys suited to a variety of applications, from gas...

  20. Minor Actinide Laboratory at JRC-ITU: Fuel fabrication facility

    International Nuclear Information System (INIS)

    Fernandez, A.; McGinley, J.; Somers, J.

    2008-01-01

    The Minor Actinide Laboratory (MA-lab) of the Institute for Transuranium Elements is a unique facility for the fabrication of fuels and targets containing minor actinides (MA). It is of key importance for research on Partitioning and Transmutation in Europe, as it is one of the only dedicated facilities for the fabrication of MA containing materials, either for property measurements or for the production of test pins for irradiation experiments. In this paper a detailed description of the MA-Lab facility and the fabrication processes developed to fabricate fuels and samples containing high content of minor actinides is given. In addition, experience gained and improvements are also outlined. (authors)

  1. Fabricating nuclear components

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    Activities of the Nuclear Engineering Division of Vickers Ltd., particularly fabrication of long slim tubular components for power reactors and the construction of irradiation loops and rigs, are outlined. The processes include hydraulic forming for fabrication of various types of tubes and outer cases of fuel transfer buckets, various specialised welding operations including some applications of the TIG process, and induction brazing of specialised assemblies. (U.K.)

  2. Nuclear Fabrication Consortium

    Energy Technology Data Exchange (ETDEWEB)

    Levesque, Stephen [EWI, Columbus, OH (United States)

    2013-04-05

    This report summarizes the activities undertaken by EWI while under contract from the Department of Energy (DOE) Office of Nuclear Energy (NE) for the management and operation of the Nuclear Fabrication Consortium (NFC). The NFC was established by EWI to independently develop, evaluate, and deploy fabrication approaches and data that support the re-establishment of the U.S. nuclear industry: ensuring that the supply chain will be competitive on a global stage, enabling more cost-effective and reliable nuclear power in a carbon constrained environment. The NFC provided a forum for member original equipment manufactures (OEM), fabricators, manufacturers, and materials suppliers to effectively engage with each other and rebuild the capacity of this supply chain by : Identifying and removing impediments to the implementation of new construction and fabrication techniques and approaches for nuclear equipment, including system components and nuclear plants. Providing and facilitating detailed scientific-based studies on new approaches and technologies that will have positive impacts on the cost of building of nuclear plants. Analyzing and disseminating information about future nuclear fabrication technologies and how they could impact the North American and the International Nuclear Marketplace. Facilitating dialog and initiate alignment among fabricators, owners, trade associations, and government agencies. Supporting industry in helping to create a larger qualified nuclear supplier network. Acting as an unbiased technology resource to evaluate, develop, and demonstrate new manufacturing technologies. Creating welder and inspector training programs to help enable the necessary workforce for the upcoming construction work. Serving as a focal point for technology, policy, and politically interested parties to share ideas and concepts associated with fabrication across the nuclear industry. The report the objectives and summaries of the Nuclear Fabrication Consortium

  3. Inertial-confinement-fusion targets

    International Nuclear Information System (INIS)

    Hendricks, C.D.

    1981-01-01

    Inertial confinement fusion (ICF) targets are made as simple flat discs, as hollow shells or as complicated multilayer structures. Many techniques have been devised for producing the targets. Glass and metal shells are made by using drop and bubble techniques. Solid hydrogen shells are also produced by adapting old methods to the solution of modern problems. Some of these techniques, problems and solutions are discussed. In addition, the applications of many of the techniques to fabrication of ICF targets is presented

  4. A triple axes multiple target holder assembly

    International Nuclear Information System (INIS)

    Tribedi, L.C.; Narvekar, S.D.; Pillay, R.G.; Tandon, P.N.

    1993-01-01

    We have designed and fabricated a rotatable target holder assembly capable of accommodating 27 targets. The target foils are mounted along two concentric circles on a ss wheel. On the outer circle 18 targets can be mounted each 20deg apart, and on the inner circle the remaining targets are positioned each 40deg apart. The self supporting or carbon backed targets are mounted on thin frames and are placed concentrically at the targets are mounted on thin frames and are placed concentrically at the target position on the wheel. Three degrees of freedom are provided to the target holder assembly. (author). 1 fig

  5. Mechanical properties, chemical analysis and evaluation of antimicrobial response of Si-DLC coatings fabricated on AISI 316 LVM substrate by a multi-target DC-RF magnetron sputtering method for potential biomedical applications

    Science.gov (United States)

    Bociaga, Dorota; Sobczyk-Guzenda, Anna; Szymanski, Witold; Jedrzejczak, Anna; Jastrzebska, Aleksandra; Olejnik, Anna; Jastrzebski, Krzysztof

    2017-09-01

    In this study silicon doped diamond-like carbon (Si-DLC) coatings were synthesized on two substrates: silicon and AISI 316LVM stainless steel using a multi-target DC-RF magnetron sputtering method. The Si content in the films ranged between 4 and 16 at.%, and was controlled by the electrical power applied in RF regime to Si cathode target. The character of the chemical bonds was revealed by FTIR analysis. With the addition of silicon the hydroxyl absorption (band in the range of 3200-3600 cm-1) increased what suggests more hydrophilic character of the coating. There were also observed significant changes in bonding of Si atoms. For low content of dopant, Si-O-Si bond system is predominant, while for the highest content of silicon there is an evidence of the shift to Si-C bonds in close proximity to methyl groups. The Raman spectroscopy revealed that the G peak position is shifted to a lower wavenumber and the ID/IG ratio decreased with increasing Si content, which indicates an increase in the C-sp3 content. Regardless of the coatings' composition, the improvement of hardness in comparison to pure substrate material (AISI 316 LVM) was observed. Although the reduction of the level of hardness from the level of 10.8 GPa for pure DLC to about 9.4 GPa for the silicon doped coatings was observed, the concomitant improvement of films adhesion with higher amount of Si was revealed. Although incorporation of the dopant to DLC coatings increases the number of E. coli cells which adhered to the examined surfaces, the microbial colonisation remains on the level of substrate material. The presented results prove the potential of Si-DLC coatings in biomedical applications from the point of view of their mechanical properties.

  6. Understanding core conductor fabrics

    International Nuclear Information System (INIS)

    Swenson, D E

    2011-01-01

    ESD Association standard test method ANSI/ESD STM2.1 - Garments (STM2.1), provides electrical resistance test procedures that are applicable for materials and garments that have surface conductive or surface dissipative properties. As has been reported in other papers over the past several years 1 fabrics are now used in many industries for electrostatic control purposes that do not have surface conductive properties and therefore cannot be evaluated using the procedures in STM2.1 2 . A study was conducted to compare surface conductive fabrics with samples of core conductor fibre based fabrics in order to determine differences and similarities with regards to various electrostatic properties. This work will be used to establish a new work item proposal within WG-2, Garments, in the ESD Association Standards Committee in the USA.

  7. Approaches for the integration of human factors into the upgrading and refurbishment of control rooms - Summary and conclusions - Principal Working Group 1 on Operating Experience and Human Factors

    International Nuclear Information System (INIS)

    2002-01-01

    A modern approach to control room design, be it for upgrading or complete refurbishment, requires the integration of many disciplines and approaches. The integration of human factors into such a process continues to present challenges. How such a process should be conceived, planned, and carried out is of considerable interest to designers, operators and regulators. Many NPPs around the world have been, or will be faced with decisions concerning modernization of their control rooms. Such changes can be driven by a range of issues including; the need to replace outdated control and instrumentation systems; increasing regulatory concern about human performance; or the need to provide a better process control environment for NPPs whose life cycles extend beyond that originally intended. Considering the importance of operator performance for safe and profitable operations, a process for ensuring that human factors issues are properly addressed could be central to the success or failure of such a project. Human factors is of particular importance when a combination of existing and new systems are to be used, resulting in a so-called 'hybrid' control room. The workshop addressed this topical area by providing a forum where a number of important areas could be discussed and experiences and lessons shared. Topics identified before hand as important and worthy of discussion included: - Exploration of how human factors issues can be identified. - Consideration of those processes and techniques necessary to ensure that appropriate requirements are specified, and that suitable data is gathered and analysed. - Identification and discussion of issues related to the above topics together with lessons from utilities, vendors and regulators which have faced, or are currently facing, these challenges. The meeting itself focused on the state of knowledge and current best practices within these areas and provided a forum for the open discussion of the human factors issues, as seen by

  8. Fabrication of multilayer nanowires

    Energy Technology Data Exchange (ETDEWEB)

    Kaur, Jasveer, E-mail: kaurjasveer89@gmail.com; Singh, Avtar; Kumar, Davinder [Department of Physics, Punjabi University Patiala, 147002, Punjab (India); Thakur, Anup; Kaur, Raminder, E-mail: raminder-k-saini@yahoo.com [Department of Basic and Applied Sciences, Punjabi University Patiala, 147002, Punjab (India)

    2016-05-06

    Multilayer nanowires were fabricated by potentiostate ectrodeposition template synthesis method into the pores of polycarbonate membrane. In present work layer by layer deposition of two different metals Ni and Cu in polycarbonate membrane having pore size of 600 nm were carried out. It is found that the growth of nanowires is not constant, it varies with deposition time. Scanning electron microscopy (SEM) is used to study the morphology of fabricated multilayer nanowires. An energy dispersive X-ray spectroscopy (EDS) results confirm the composition of multilayer nanowires. The result shows that multilayer nanowires formed is dense.

  9. MOX Fabrication Isolation Considerations

    Energy Technology Data Exchange (ETDEWEB)

    Eric L. Shaber; Bradley J Schrader

    2005-08-01

    This document provides a technical position on the preferred level of isolation to fabricate demonstration quantities of mixed oxide transmutation fuels. The Advanced Fuel Cycle Initiative should design and construct automated glovebox fabrication lines for this purpose. This level of isolation adequately protects the health and safety of workers and the general public for all mixed oxide (and other transmutation fuel) manufacturing efforts while retaining flexibility, allowing parallel development and setup, and minimizing capital expense. The basis regulations, issues, and advantages/disadvantages of five potential forms of isolation are summarized here as justification for selection of the preferred technical position.

  10. Fabrication of multilayer nanowires

    International Nuclear Information System (INIS)

    Kaur, Jasveer; Singh, Avtar; Kumar, Davinder; Thakur, Anup; Kaur, Raminder

    2016-01-01

    Multilayer nanowires were fabricated by potentiostate ectrodeposition template synthesis method into the pores of polycarbonate membrane. In present work layer by layer deposition of two different metals Ni and Cu in polycarbonate membrane having pore size of 600 nm were carried out. It is found that the growth of nanowires is not constant, it varies with deposition time. Scanning electron microscopy (SEM) is used to study the morphology of fabricated multilayer nanowires. An energy dispersive X-ray spectroscopy (EDS) results confirm the composition of multilayer nanowires. The result shows that multilayer nanowires formed is dense.

  11. Text-Fabric

    NARCIS (Netherlands)

    Roorda, Dirk

    2016-01-01

    Text-Fabric is a Python3 package for Text plus Annotations. It provides a data model, a text file format, and a binary format for (ancient) text plus (linguistic) annotations. The emphasis of this all is on: data processing; sharing data; and contributing modules. A defining characteristic is that

  12. PIGMI mechanical fabrication

    International Nuclear Information System (INIS)

    Hart, V.E.

    1976-01-01

    A prime goal of the mechanical design effort associated with the PIGMI (Pion Generator for Medical Irradiations) program is to investigate new materials and fabrication techniques in an effort to obtain increased machine efficiency and reliability at a reasonable cost. The following discussion deals with the modeling program that LASL is pursuing for 450-MHz and 1350-MHz PIGMI development. (author)

  13. Micromechanical Structures Fabrication; FINAL

    International Nuclear Information System (INIS)

    Rajic, S

    2001-01-01

    Work in materials other than silicon for MEMS applications has typically been restricted to metals and metal oxides instead of more ''exotic'' semiconductors. However, group III-V and II-VI semiconductors form a very important and versatile collection of material and electronic parameters available to the MEMS and MOEMS designer. With these materials, not only are the traditional mechanical material variables (thermal conductivity, thermal expansion, Young's modulus, etc.) available, but also chemical constituents can be varied in ternary and quaternary materials. This flexibility can be extremely important for both friction and chemical compatibility issues for MEMS. In addition, the ability to continually vary the bandgap energy can be particularly useful for many electronics and infrared detection applications. However, there are two major obstacles associated with alternate semiconductor material MEMS. The first issue is the actual fabrication of non-silicon micro-devices and the second impediment is communicating with these novel devices. We have implemented an essentially material independent fabrication method that is amenable to most group III-V and II-VI semiconductors. This technique uses a combination of non-traditional direct write precision fabrication processes such as diamond turning, ion milling, laser ablation, etc. This type of deterministic fabrication approach lends itself to an almost trivial assembly process. We also implemented a mechanical, electrical, and optical self-aligning hybridization technique for these alternate-material MEMS substrates

  14. Fabrication activity for nanophotonics

    DEFF Research Database (Denmark)

    Malureanu, Radu; Chung, Il-Sug; Carletti, Luca

    We present the fabrication and characterization of new structures and materials to be used in nanophotonics. The first structure presented is a fractal metallic metasurface designed to be used as a high-sensitivity sensor for 810nm wavelength. A second structure is a high index contrast grating...

  15. Refurbishment and optimisation of the district heating system and the Morettina central heating station in Locarno, Switzerland; Sanierung und Optimierung des Waermeverbundes und der Heizzentrale Morettina in Locarno. Erfolgskontrolle der Betriebsoptimierung

    Energy Technology Data Exchange (ETDEWEB)

    Lanz, S. [Dr. Eicher und Pauli AG, Berne (Switzerland); Ceschi, P. A. [Calore SA, c/o S.E.S., Locarno (Switzerland)

    2004-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) discusses the successful operational optimisation of a district heating system in Locarno in southern Switzerland. The system supplies various public and private buildings with heat and cold. This pilot installation features boilers fired with liquefied gas, a combined heat and power unit and a combined heat-pump/refrigeration system. The refurbishment of the installations after three years of operation is described, which included changes to the system's hydraulics and control system as well as improvements to various sub-stations in the heating network. The results of the refurbishment, including better co-ordination of the various aggregates and lower operating temperatures, are discussed. Recommendations are also made on the planning, organisation and operation of future projects of this type.

  16. Fabrication of inert matrices for heterogeneous transmutation. EFTTRA-T2 (RAS 2) irradiation programme

    International Nuclear Information System (INIS)

    Boshoven, J.G.; Hein, H.; Konings, R.J.M.

    1996-07-01

    This report describes the fabrication of targets containing inert matrices for the heterogeneous transmutation of plutonium and minor actinides. These targets will be irradiated in the EFTTRA-T2 (RAS-2) irradiation programme. The selection, preparation and characterization of the inert matrices and fabrication and loading of the irradiation capsules are discussed. (orig.)

  17. Integrating Life Cycle Energy into the Design of Façade Refurbishment for a Post-War Residential Building in The Netherlands

    Directory of Open Access Journals (Sweden)

    Paressa Loussos

    2015-05-01

    Full Text Available The existing building stock has been in the focus of European Union policies for energy savings. Nevertheless, energy certification schemes refer mostly to operational energy and usually do not consider aspects related to the life cycle of the building. To look at the overall energy cost during the lifespan of a building, the energy used to produce and assemble the building materials also needs to be included. This paper develops a design methodology for existing residential buildings that aims at decreasing the life cycle energy use as much as possible. This approach was applied on a case study of an existing post-war residential building in Utrecht, The Netherlands. The main focus of this study is to find a design solution for façade retrofitting that considers both embodied and operational energy. The design approach is based on comparing different strategies for the use of façade materials. This design methodology can be replicated in other projects, as the conclusions and recommendations can also be used for future refurbishment projects for which a low operational energy and materials with a low embodied energy are desired.

  18. NRC Information No. 91-48: False certificates of conformance provided by Westinghouse Electric Supply Company for refurbished commercial-grade circuit breakers

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1992-01-01

    In April 1988, WESCO of Albany, New York, supplied 250 MCCBs (molded-case circuit breakers) to Spectrum of Schenectady, New York. Spectrum dedicated these commercial-grade items on the basis of independent testing and the certificates of conformance (CoCs) it received from WESCO. During receipt inspection testing, Peach Bottom determined that the MCCBs were not new and had been refurbished. The NRC conducted an inspection and investigation of Spectrum and WESCO in 1988 and 1989. During these efforts, the NRC identified that the MCCBs provided to Peach Bottom were reconditioned and not new equipment as specified in the purchase order. Although the purchase order from Spectrum to WESCO specifically required new equipment and CoCs, WESCO purchased the MCCBs from a subvendor which dealt mainly in reconditioned equipment and provided these reconditioned MCCBs to Spectrum with falsified CoCs that certified that they were new equipment. In addition, the investigation identified that WESCO ordered Westinghouse labels from the subvendor in order to label the shipping boxes that lacked labels. Spectrum performed the dedication inspection and testing to demonstrate the adequacy of the MCCBs from WESCO. However, the validity of this testing depended on the MCCBs being new equipment. Spectrum's failure to verify the accuracy or the validity of the CoCs resulted in Spectrum accepting fraudulent CoCs and providing reconditioned (as opposed to new) MCCBs to Peach Bottom

  19. Summary of public participation : Environmental impact assessment : Proposal by the New Brunswick Power Commission to refurbish the Coleson Cove generating station

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-09-01

    A proposal was made by New Brunswick (NB) Power for the refurbishment of the Coleson Cove generating station, to the Public Utilities Board (PUB). It was determined by the PUB that a requirement existed for 1050 megawatt (MW) of power at Coleson Cove. This document presented a summary of public participation. Two meetings were held in support of the Environmental Impact Assessment (EIA). Several concerns were raised by various groups at both meetings. Some of the issues discussed included: (1) Orimulsion{sup R} fuel, reputed to be the dirtiest fuel in the world, (2) fuel supply, (3) project agenda, (4) project costs and others. It appeared that most of the participants in the public consultation process were against the proposal. It was felt that the emissions of sulphur dioxide and nitrous oxide should be considered in the greater context of reducing present and future emissions of greenhouse gases. The participants recommended that the New Brunswick government support a 400 MW combined cycle natural gas turbine unit instead of the proposal under review. Much opposition to the project concerned the potential degradation of the environment and the health of the citizens. Environmental representatives were concerned since the Solid Waste Management Area would be located in the vicinity of a proposed marine and wildlife sanctuary. Industry representatives were eager for the opportunities offered by the proposal. refs.

  20. Description and evaluation of a serious game intervention to engage low secure service users with serious mental illness in the design and refurbishment of their environment.

    Science.gov (United States)

    Fitzgerald, M M; Kirk, G D; Bristow, C A

    2011-05-01

    Service user involvement in all levels of healthcare provision is the expectation of UK government policy. Involvement should not only include participation in the planning and delivery of health care but also the exercise of choice and opinions about that care. In practice, however, service user engagement is most often tokenistic, involving post hoc consultation over plans already committed to by services. This paper explores an Occupational Therapy-led initiative to use the Serious Game format to engage low secure service users with serious mental illness in the design, layout and refurbishment of their unit. Among other things how medication was to be dispensed on the new unit was explored by this game and led to significant replanning in response to service user involvement. The game format was found to be a useful tool in facilitating communication between professionals and a traditionally marginalized and powerless client group. It enabled service users to have a voice, it provided a format for that voice to be heard and made possible service-led change in the planning process. © 2010 Blackwell Publishing.

  1. Status report, canister fabrication

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Claes-Goeran; Eriksson, Peter; Westman, Marika [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden); Emilsson, Goeran [CSM Materialteknik AB, Linkoeping (Sweden)

    2004-06-01

    The report gives an account of the development of material and fabrication technology for copper canisters with cast inserts during the period from 2000 until the start of 2004. The engineering design of the canister and the choice of materials in the constituent components described in previous status reports have not been significantly changed. In the reference canister, the thickness of the copper shell is 50 mm. Fabrication of individual components with a thinner copper thickness is done for the purpose of gaining experience and evaluating fabrication and inspection methods for such canisters. As a part of the development of cast inserts, computer simulations of the casting processes and techniques used at the foundries have been performed for the purpose of optimizing the material properties. These properties have been evaluated by extensive tensile testing and metallographic inspection of test material taken from discs cut at different points along the length of the inserts. The testing results exhibit a relatively large spread. Low elongation values in certain tensile test specimens are due to the presence of poorly formed graphite, porosities, slag or other casting defects. It is concluded in the report that it will not be possible to avoid some presence of observed defects in castings of this size. In the deep repository, the inserts will be exposed to compressive loading and the observed defects are not critical for strength. An analysis of the strength of the inserts and formulation of relevant material requirements must be based on a statistical approach with probabilistic calculations. This work has been initiated and will be concluded during 2004. An initial verifying compression test of a canister in an isostatic press has indicated considerable overstrength in the structure. Seamless copper tubes are fabricated by means of three methods: extrusion, pierce and draw processing, and forging. It can be concluded that extrusion tests have revealed a

  2. Status report, canister fabrication

    International Nuclear Information System (INIS)

    Andersson, Claes-Goeran; Eriksson, Peter; Westman, Marika; Emilsson, Goeran

    2004-06-01

    The report gives an account of the development of material and fabrication technology for copper canisters with cast inserts during the period from 2000 until the start of 2004. The engineering design of the canister and the choice of materials in the constituent components described in previous status reports have not been significantly changed. In the reference canister, the thickness of the copper shell is 50 mm. Fabrication of individual components with a thinner copper thickness is done for the purpose of gaining experience and evaluating fabrication and inspection methods for such canisters. As a part of the development of cast inserts, computer simulations of the casting processes and techniques used at the foundries have been performed for the purpose of optimizing the material properties. These properties have been evaluated by extensive tensile testing and metallographic inspection of test material taken from discs cut at different points along the length of the inserts. The testing results exhibit a relatively large spread. Low elongation values in certain tensile test specimens are due to the presence of poorly formed graphite, porosities, slag or other casting defects. It is concluded in the report that it will not be possible to avoid some presence of observed defects in castings of this size. In the deep repository, the inserts will be exposed to compressive loading and the observed defects are not critical for strength. An analysis of the strength of the inserts and formulation of relevant material requirements must be based on a statistical approach with probabilistic calculations. This work has been initiated and will be concluded during 2004. An initial verifying compression test of a canister in an isostatic press has indicated considerable overstrength in the structure. Seamless copper tubes are fabricated by means of three methods: extrusion, pierce and draw processing, and forging. It can be concluded that extrusion tests have revealed a

  3. Automated breeder fuel fabrication

    International Nuclear Information System (INIS)

    Goldmann, L.H.; Frederickson, J.R.

    1983-01-01

    The objective of the Secure Automated Fabrication (SAF) Project is to develop remotely operated equipment for the processing and manufacturing of breeder reactor fuel pins. The SAF line will be installed in the Fuels and Materials Examination Facility (FMEF). The FMEF is presently under construction at the Department of Energy's (DOE) Hanford site near Richland, Washington, and is operated by the Westinghouse Hanford Company (WHC). The fabrication and support systems of the SAF line are designed for computer-controlled operation from a centralized control room. Remote and automated fuel fabriction operations will result in: reduced radiation exposure to workers; enhanced safeguards; improved product quality; near real-time accountability, and increased productivity. The present schedule calls for installation of SAF line equipment in the FMEF beginning in 1984, with qualifying runs starting in 1986 and production commencing in 1987. 5 figures

  4. OPO fabric decontamination

    International Nuclear Information System (INIS)

    Severa, J.; Bar, J.; Grujbar, V.

    1978-01-01

    Samples of five polypropylene-based man-made fabrics were studied with regard to the degree of contamination and possibilities of decontamination in order to assess their suitability as material for protective clothing in the nuclear industry. The contamination degree of the fabrics in an aqueous solution of a fission product mixture was found to be low. Soaking in a mixture of the Sapon detergent and sodium hexametaphosphate at a concentration of both materials of 1 g/l with subsequent washing in a solution of the Zenit detergent at a concentration of 3 g/l was suggested as the most suitable decontamination procedure. It reduces the initial contamination by almost 99%. (Z.M.)

  5. CERN: Fixed target targets

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1993-03-15

    Full text: While the immediate priority of CERN's research programme is to exploit to the full the world's largest accelerator, the LEP electron-positron collider and its concomitant LEP200 energy upgrade (January, page 1), CERN is also mindful of its long tradition of diversified research. Away from LEP and preparations for the LHC proton-proton collider to be built above LEP in the same 27-kilometre tunnel, CERN is also preparing for a new generation of heavy ion experiments using a new source, providing heavier ions (April 1992, page 8), with first physics expected next year. CERN's smallest accelerator, the LEAR Low Energy Antiproton Ring continues to cover a wide range of research topics, and saw a record number of hours of operation in 1992. The new ISOLDE on-line isotope separator was inaugurated last year (July, page 5) and physics is already underway. The remaining effort concentrates around fixed target experiments at the SPS synchrotron, which formed the main thrust of CERN's research during the late 1970s. With the SPS and LEAR now approaching middle age, their research future was extensively studied last year. Broadly, a vigorous SPS programme looks assured until at least the end of 1995. Decisions for the longer term future of the West Experimental Area of the SPS will have to take into account the heavy demand for test beams from work towards experiments at big colliders, both at CERN and elsewhere. The North Experimental Area is the scene of larger experiments with longer lead times. Several more years of LEAR exploitation are already in the pipeline, but for the longer term, the ambitious Superlear project for a superconducting ring (January 1992, page 7) did not catch on. Neutrino physics has a long tradition at CERN, and this continues with the preparations for two major projects, the Chorus and Nomad experiments (November 1991, page 7), to start next year in the West Area. Delicate neutrino oscillation effects could become visible for the first

  6. Intentionally fabricated autobiographical memories

    OpenAIRE

    Justice, LV; Morrison, CM; Conway, MA

    2017-01-01

    Participants generated both autobiographical memories (AMs) that they believed to be true and intentionally fabricated autobiographical memories (IFAMs). Memories were constructed while a concurrent memory load (random 8-digit sequence) was held in mind or while there was no concurrent load. Amount and accuracy of recall of the concurrent memory load was reliably poorer following generation of IFAMs than following generation of AMs. There was no reliable effect of load on memory generation ti...

  7. Colored fused filament fabrication

    OpenAIRE

    Song, Haichuan; Lefebvre, Sylvain

    2017-01-01

    Filament fused fabrication is the method of choice for printing 3D models at low cost, and is the de-facto standard for hobbyists, makers and schools. Unfortunately, filament printers cannot truly reproduce colored objects. The best current techniques rely on a form of dithering exploiting occlusion, that was only demonstrated for shades of two base colors and that behaves differently depending on surface slope. We explore a novel approach for 3D printing colored objects, capable of creating ...

  8. CERN: Fixed target targets

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Full text: While the immediate priority of CERN's research programme is to exploit to the full the world's largest accelerator, the LEP electron-positron collider and its concomitant LEP200 energy upgrade (January, page 1), CERN is also mindful of its long tradition of diversified research. Away from LEP and preparations for the LHC proton-proton collider to be built above LEP in the same 27-kilometre tunnel, CERN is also preparing for a new generation of heavy ion experiments using a new source, providing heavier ions (April 1992, page 8), with first physics expected next year. CERN's smallest accelerator, the LEAR Low Energy Antiproton Ring continues to cover a wide range of research topics, and saw a record number of hours of operation in 1992. The new ISOLDE on-line isotope separator was inaugurated last year (July, page 5) and physics is already underway. The remaining effort concentrates around fixed target experiments at the SPS synchrotron, which formed the main thrust of CERN's research during the late 1970s. With the SPS and LEAR now approaching middle age, their research future was extensively studied last year. Broadly, a vigorous SPS programme looks assured until at least the end of 1995. Decisions for the longer term future of the West Experimental Area of the SPS will have to take into account the heavy demand for test beams from work towards experiments at big colliders, both at CERN and elsewhere. The North Experimental Area is the scene of larger experiments with longer lead times. Several more years of LEAR exploitation are already in the pipeline, but for the longer term, the ambitious Superlear project for a superconducting ring (January 1992, page 7) did not catch on. Neutrino physics has a long tradition at CERN, and this continues with the preparations for two major projects, the Chorus and Nomad experiments (November 1991, page 7), to start next year in the West Area. Delicate neutrino oscillation effects could become

  9. Description of ECRI (CNEA'S MTR fuel fabrication plant)

    International Nuclear Information System (INIS)

    Echenique, P.; Fabro, J.; Podesta, D.; Restelli, M.; Rossi, G.; Alvarez, L.; Adelfang, P.

    2002-01-01

    The ECRI Plant is dedicated to the development and fabrication of high-density fuel elements and targets for 99 Mo. In this sector had been done the start up Fuel Elements for the Reactors of Peru, Iran, Algeria and Egypt. All of them were made with U 3 O 8 . The targets for 99 Mo using HEU were fabricated too in the last years. The new material of high-density for Fuel Elements as U 3 Si 2 were done in this sector, three prototypes were fabricated, two are still under irradiation. (P06 and P07). As new developments we are working with U-Mo (7%) Fuel Plates with both material Korean and HMD. This work is under the RERTR Program and two fuel elements, manufactured by us, with both powders, will be irradiated in Petten. For 99 Mo targets, we are fabricating miniplates of LEU with an AlUx powder by pulvi-metallurgy technique. And it is under development the foils targets under the RERTR Program. A general view of the fabrication facilities and control sector will be shown. The different operations that are done in each sector will be explained. All our activities will be certified under the ISO 9000 and we are working hard to get it in the middle of 2003. (author)

  10. Measurements of emissions during waste wood combustion to identify refurbishment needs; Maetning av emissioner vid foerbraenning av RT-flis foer att identifiera eventuella ombyggnadsaatgaerder

    Energy Technology Data Exchange (ETDEWEB)

    Lindau, Leif

    2003-01-01

    The background to this project is the new EU directive 2000/76/EG regarding incineration of waste. This directive may have an effect on emission limits for Swedish plants firing waste wood. It may lead to needs of refurbishment in e.g. the area of flue gas cleaning equipment. In order to produce a basis to evaluate the need for such upgrading, measurement of metals, HCI, SO{sub 2} , CO, TOC and dioxin have been carried out on three plants firing wood waste: a grate boiler (Handeloeverket P11), one circulating fluid bed boiler (Aaterbruket in Lomma), and a bubbling fluidised bed boiler (Johannes in Gaevle, firing 50% waste wood). The measurements have mainly been carried out after boiler, equivalent to upstream flue gas cleaning. The results are that the demands of the EU directive on most points can be managed with existing equipment if this consists of electrostatic precipitator or bag filter with good performance and flue gas condensor. Without flue gas condensor, there is a need for other measures for 1-10 and for grate boilers, SO{sub 2} as well. The requirements in the directive for TOC is weaker than the demand on CO, and correspondingly, the demand on CO is driving. The level of dioxin from the boiler (upstream filter) exceeds allowed emission, and is in the range of 0,1-2 ng TE/Nm{sup 3} tg, 6 % O{sub 2} . Existing equipment will meet the emission limit for the lower levels (0,1-0,3) , but not safely for the higher levels (1,5-2). Correspondingly, there may be a need for equipment upgrading, e.g. in the form of activated carbon injection upstream flue gas filter.

  11. Target laboratory

    International Nuclear Information System (INIS)

    Ephraim, D.C.; Pednekar, A.R.

    1993-01-01

    A target laboratory to make stripper foils for the accelerator and various targets for use in the experiments is set up in the pelletron accelerator facility. The facilities available in the laboratory are: (1) D.C. glow discharge setup, (2) carbon arc set up, and (3) vacuum evaporation set up (resistance heating), electron beam source, rolling mill - all for target preparation. They are described. Centrifugal deposition technique is used for target preparation. (author). 3 figs

  12. FPGA fabric specific optimization for RLT design

    International Nuclear Information System (INIS)

    Perwaiz, A.; Khan, S.A.

    2010-01-01

    This paper proposes a technique custom to the optimization requirements suited for a particular family of Field Programmable Gate Arrays (FPGAs). As FPGAs have introduced re configurable black boxes there is a need to perform optimization across FPGAs slice fabric in order to achieve optimum performance. Though the Register Transfer Level (RTL) Hardware Descriptive Language (HDL) code should be technology independent but in many design instances it is imperative to understand the target technology especially once the target device embeds dedicated arithmetic blocks. No matter what the degree of optimization of the algorithm is, the configuration of target device plays an important role as far as the device utilization and path delays are concerned Index Terms: Field Programmable Gate Arrays (FPGA), Compression Tree, Bit Width Reduction, Look Ahead Pipelining. (author)

  13. Intraocular lens fabrication

    Energy Technology Data Exchange (ETDEWEB)

    Salazar, Mike A. (Albuquerque, NM); Foreman, Larry R. (Los Alamos, NM)

    1997-01-01

    This invention describes a method for fabricating an intraocular lens made rom clear Teflon.TM., Mylar.TM., or other thermoplastic material having a thickness of about 0.025 millimeters. These plastic materials are thermoformable and biocompatable with the human eye. The two shaped lenses are bonded together with a variety of procedures which may include thermosetting and solvent based adhesives, laser and impulse welding, and ultrasonic bonding. The fill tube, which is used to inject a refractive filling material is formed with the lens so as not to damage the lens shape. A hypodermic tube may be included inside the fill tube.

  14. Intraocular lens fabrication

    Energy Technology Data Exchange (ETDEWEB)

    Salazar, M.A.; Foreman, L.R.

    1997-07-08

    This invention describes a method for fabricating an intraocular lens made from clear Teflon{trademark}, Mylar{trademark}, or other thermoplastic material having a thickness of about 0.025 millimeters. These plastic materials are thermoformable and biocompatable with the human eye. The two shaped lenses are bonded together with a variety of procedures which may include thermosetting and solvent based adhesives, laser and impulse welding, and ultrasonic bonding. The fill tube, which is used to inject a refractive filling material is formed with the lens so as not to damage the lens shape. A hypodermic tube may be included inside the fill tube. 13 figs.

  15. Mask fabrication process

    Science.gov (United States)

    Cardinale, Gregory F.

    2000-01-01

    A method for fabricating masks and reticles useful for projection lithography systems. An absorber layer is conventionally patterned using a pattern and etch process. Following the step of patterning, the entire surface of the remaining top patterning photoresist layer as well as that portion of an underlying protective photoresist layer where absorber material has been etched away is exposed to UV radiation. The UV-exposed regions of the protective photoresist layer and the top patterning photoresist layer are then removed by solution development, thereby eliminating the need for an oxygen plasma etch and strip and chances for damaging the surface of the substrate or coatings.

  16. Advanced fabrication technology

    International Nuclear Information System (INIS)

    Sheely, W.F.

    1986-01-01

    The Fuel Cycle Plant is a multipurpose nuclear facility located on the Hanford Nuclear Reservation in eastern Washington state. The facility is part of the Hanford Engineering Development Laboratory which is operated by Westinghouse Hanford Company for the Department of Energy. The Fuel Cycle Plant is currently being prepared to support the Liquid Metal Reactors Program with fuel fabrication services for the Fast Flux Test Facility and other LMR programs. This report describes the technical innovations to be utilized in the operation of this plant

  17. Ice targets

    International Nuclear Information System (INIS)

    Pacheco, C.; Stark, C.; Tanaka, N.; Hodgkins, D.; Barnhart, J.; Kosty, J.

    1979-12-01

    This report presents a description of ice targets that were constructed for research work at the High Resolution Spectrometer (HRS) and at the Energetic Pion Channel and Spectrometer (EPICS). Reasons for using these ice targets and the instructions for their construction are given. Results of research using ice targets will be published at a later date

  18. Reforming Shapes for Material-aware Fabrication

    KAUST Repository

    Yang, Yongliang; Wang, Jun; Mitra, Niloy J.

    2015-01-01

    © 2015 The Eurographics Association and John Wiley & Sons Ltd. Published by John Wiley & Sons Ltd. As humans, we regularly associate shape of an object with its built material. In the context of geometric modeling, however, this inter-relation between form and material is rarely explored. In this work, we propose a novel data-driven reforming (i.e.; reshaping) algorithm that adapts an input multi-component model for a target fabrication material. The algorithm adapts both the part geometry and the inter-part topology of the input shape to better align with material-aware fabrication requirements. As output, we produce the reshaped model along with respective part dimensions and inter-part junction specifications. We evaluate our algorithm on a range of man-made models and demonstrate a variety of model reshaping examples focusing only on metal and wooden materials.

  19. Gel Fabrication of Molybdenum “Beads”

    Energy Technology Data Exchange (ETDEWEB)

    Lowden, Richard Andrew [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Armstrong, Beth L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Cooley, Kevin M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division

    2016-11-01

    Spherical molybdenum particles or “beads” of various diameters are of interest as feedstock materials for the additive manufacture of targets and assemblies used in the production of 99Mo medical isotopes using accelerator technology. Small metallic beads or ball bearings are typically fabricated from wire; however, small molybdenum spheres cannot readily be produced in this manner. Sol-gel processes are often employed to produce small dense microspheres of metal oxides across a broad diameter range that in the case of molybdenum could be reduced and sintered to produce metallic spheres. These Sol-gel type processes were examined for forming molybdenum oxide beads; however, the molybdenum trioxide was chemically incompatible with commonly used gelation materials. As an alternative, an aqueous alginate process being assessed for the fabrication of oxide spheres for catalyst applications was employed to form molybdenum trioxide beads that were successfully reduced and sintered to produce small molybdenum spheres.

  20. Reforming Shapes for Material-aware Fabrication

    KAUST Repository

    Yang, Yongliang

    2015-08-10

    © 2015 The Eurographics Association and John Wiley & Sons Ltd. Published by John Wiley & Sons Ltd. As humans, we regularly associate shape of an object with its built material. In the context of geometric modeling, however, this inter-relation between form and material is rarely explored. In this work, we propose a novel data-driven reforming (i.e.; reshaping) algorithm that adapts an input multi-component model for a target fabrication material. The algorithm adapts both the part geometry and the inter-part topology of the input shape to better align with material-aware fabrication requirements. As output, we produce the reshaped model along with respective part dimensions and inter-part junction specifications. We evaluate our algorithm on a range of man-made models and demonstrate a variety of model reshaping examples focusing only on metal and wooden materials.

  1. Materials considerations in accelerator targets

    International Nuclear Information System (INIS)

    Peacock, H. B. Jr.; Iyer, N. C.; Louthan, M. R. Jr.

    1995-01-01

    Future nuclear materials production and/or the burn-up of long lived radioisotopes may be accomplished through the capture of spallation produced neutrons in accelerators. Aluminum clad-lead and/or lead alloys has been proposed as a spallation target. Aluminum was the cladding choice because of the low neutron absorption cross section, fast radioactivity decay, high thermal conductivity, and excellent fabricability. Metallic lead and lead oxide powders were considered for the target core with the fabrication options being casting or powder metallurgy (PM). Scoping tests to evaluate gravity casting, squeeze casting, and casting and swaging processes showed that, based on fabricability and heat transfer considerations, squeeze casting was the preferred option for manufacture of targets with initial core cladding contact. Thousands of aluminum clad aluminum-lithium alloy core targets and control rods for tritium production have been fabricated by coextrusion processes and successfully irradiated in the SRS reactors. Tritium retention in, and release from, the coextruded product was modeled from experimental and operational data. The model assumed that tritium atoms, formed by the 6Li(n,a)3He reaction, were produced in solid solution in the Al-Li alloy. Because of the low solubility of hydrogen isotopes in aluminum alloys, the irradiated Al-Li rapidly became supersaturated in tritium. Newly produced tritium atoms were trapped by lithium atoms to form a lithium tritide. The effective tritium pressure required for trap or tritide stability was the equilibrium decomposition pressure of tritium over a lithium tritide-aluminum mixture. The temperature dependence of tritium release was determined by the permeability of the cladding to tritium and the local equilibrium at the trap sites. The model can be used to calculate tritium release from aluminum clad, aluminum-lithium alloy targets during postulated accelerator operational and accident conditions. This paper describes

  2. Materials considerations in accelerator targets

    International Nuclear Information System (INIS)

    Peacock, H.B. Jr.; Iyer, N.C.; Louthan, M.R. Jr.

    1994-01-01

    Future nuclear materials production and/or the burn-up of long lived radioisotopes may be accomplished through the capture of spallation produced neutrons in accelerators. Aluminum clad-lead and/or lead alloys has been proposed as a spallation target. Aluminum was the cladding choice because of the low neutron absorption cross section, fast radioactivity decay, high thermal conductivity, and excellent fabricability. Metallic lead and lead oxide powders were considered for the target core with the fabrication options being casting or powder metallurgy (PM). Scoping tests to evaluate gravity casting, squeeze casting, and casting and swaging processes showed that, based on fabricability and heat transfer considerations, squeeze casting was the preferred option for manufacture of targets with initial core cladding contact. Thousands of aluminum clad aluminum-lithium alloy core targets and control rods for tritium production have been fabricated by coextrusion processes and successfully irradiated in the SRS reactors. Tritium retention in, and release from the coextruded product was modeled from experimental and operational data. Newly produced tritium atoms were trapped by lithium atoms to form a lithium tritide. The effective tritium pressure required for trap or tritide stability was the equilibrium decomposition pressure of tritium over a lithium tritide-aluminum mixture. The temperature dependence of tritium release was determined by the permeability of the cladding to tritium and the local equilibrium at the trap sites. The model can be used to calculate tritium release from aluminum clad, aluminum-lithium alloy targets during postulated accelerator operational and accident conditions. This paper describes the manufacturing technologies evaluated and presents the model for tritium retention in aluminum clad, aluminum-lithium alloy tritium production targets

  3. Fabrication of zein nanostructure

    Science.gov (United States)

    Luecha, Jarupat

    The concerns on the increase of polluting plastic wastes as well as the U.S. dependence on imported petrochemical products have driven an attention towards alternative biodegradable polymers from renewable resources. Zein protein, a co-product from ethanol production from corn, is a good candidate. This research project aims to increase zein value by adopting nanotechnology for fabricating advanced zein packaging films and zein microfluidic devices. Two nanotechnology approaches were focused: the polymer nanoclay nanocomposite technique where the nanocomposite structures were created in the zein matrix, and the soft lithography and the microfluidic devices where the micro and nanopatterns were created on the zein film surfaces. The polymer nanoclay nanocomposite technique was adopted in the commonly used zein film fabrication processes which were solvent casting and extrusion blowing methods. The two methods resulted in partially exfoliated nanocomposite structures. The impact of nanoclays on the physical properties of zein films strongly depended on the film preparation techniques. The impact of nanoclay concentration was more pronounced in the films made by extrusion blowing technique than by the solvent casting technique. As the processability limitation for the extrusion blowing technique of the zein sample containing hight nanoclay content, the effect of the nanoclay content on the rheological properties of zein hybrid resins at linear and nonlinear viscoelastic regions were further investigated. A pristine zein resin exhibited soft solid like behavior. On the other hand, the zein hybrid with nanoclay content greater than 5 wt.% showed more liquid like behavior, suggesting that the nanoclays interrupted the entangled zein network. There was good correspondence between the experimental data and the predictions of the Wagner model for the pristine zein resins. However, the model failed to predict the steady shear properties of the zein nanoclay nanocomposite

  4. Fabrication of Foam Shells for ICF Experiments

    Science.gov (United States)

    Czechowicz, D. G.; Acenas, O.; Flowers, J. S.; Nikroo, A.; Paguio, R. R.; Schroen, D. G.; Streit, J.; Takagi, M.

    2004-11-01

    The General Atomics/Schafer team has developed processes to fabricate foam shells targets suitable for ICF experiments. The two most common chemical systems used to produce foam shells have been resorcinol-formaldehyde (R/F) aerogel and divinylbenzene (DVB). Spherical targets have been made in the form of shells and beads having diameters ranging from approximately 0.5 mm to 4.0 mm, and having densities from approximately 100 mg/cc to 250 mg/cc. The work on R/F foam shells has been concentrated on 1) shell fabrication process improvement to obtain high yields ( ˜25%) and 2) depositing a reliable permeation barrier to provide shells for ongoing direct drive experiments at LLE. Development of divinylbenzene foam shells has been mainly directed towards Inertial Fusion Energy applications (at densities as low as 30 mg/cc) and recently for shells for experiments at LLE. Details of the relevant metrology and properties of these foams as well as the range of targets currently available will be discussed.

  5. National Ignition Facility Target Chamber

    International Nuclear Information System (INIS)

    Wavrik, R W; Cox, J R; Fleming, P J

    2000-01-01

    On June 11, 1999 the Department of Energy dedicated the single largest piece of the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) in Livermore, California. The ten (10) meter diameter aluminum target high vacuum chamber will serve as the working end of the largest laser in the world. The output of 192 laser beams will converge at the precise center of the chamber. The laser beams will enter the chamber in two by two arrays to illuminate 10 millimeter long gold cylinders called hohlraums enclosing 2 millimeter capsule containing deuterium, tritium and isotopes of hydrogen. The two isotopes will fuse, thereby creating temperatures and pressures resembling those found only inside stars and in detonated nuclear weapons, but on a minute scale. The NIF Project will serve as an essential facility to insure safety and reliability of our nation's nuclear arsenal as well as demonstrating inertial fusion's contribution to creating electrical power. The paper will discuss the requirements that had to be addressed during the design, fabrication and testing of the target chamber. A team from Sandia National Laboratories (SNL) and LLNL with input from industry performed the configuration and basic design of the target chamber. The method of fabrication and construction of the aluminum target chamber was devised by Pitt-Des Moines, Inc. (PDM). PDM also participated in the design of the chamber in areas such as the Target Chamber Realignment and Adjustment System, which would allow realignment of the sphere laser beams in the event of earth settlement or movement from a seismic event. During the fabrication of the target chamber the sphericity tolerances had to be addressed for the individual plates. Procedures were developed for forming, edge preparation and welding of individual plates. Construction plans were developed to allow the field construction of the target chamber to occur parallel to other NIF construction activities. This was

  6. Intentionally fabricated autobiographical memories.

    Science.gov (United States)

    Justice, Lucy V; Morrison, Catriona M; Conway, Martin A

    2018-02-01

    Participants generated both autobiographical memories (AMs) that they believed to be true and intentionally fabricated autobiographical memories (IFAMs). Memories were constructed while a concurrent memory load (random 8-digit sequence) was held in mind or while there was no concurrent load. Amount and accuracy of recall of the concurrent memory load was reliably poorer following generation of IFAMs than following generation of AMs. There was no reliable effect of load on memory generation times; however, IFAMs always took longer to construct than AMs. Finally, replicating previous findings, fewer IFAMs had a field perspective than AMs, IFAMs were less vivid than AMs, and IFAMs contained more motion words (indicative of increased cognitive load). Taken together, these findings show a pattern of systematic differences that mark out IFAMs, and they also show that IFAMs can be identified indirectly by lowered performance on concurrent tasks that increase cognitive load.

  7. NCSX Vacuum Vessel Fabrication

    International Nuclear Information System (INIS)

    Viola ME; Brown T; Heitzenroeder P; Malinowski F; Reiersen W; Sutton L; Goranson P; Nelson B; Cole M; Manuel M; McCorkle D.

    2005-01-01

    The National Compact Stellarator Experiment (NCSX) is being constructed at the Princeton Plasma Physics Laboratory (PPPL) in conjunction with the Oak Ridge National Laboratory (ORNL). The goal of this experiment is to develop a device which has the steady state properties of a traditional stellarator along with the high performance characteristics of a tokamak. A key element of this device is its highly shaped Inconel 625 vacuum vessel. This paper describes the manufacturing of the vessel. The vessel is being fabricated by Major Tool and Machine, Inc. (MTM) in three identical 120 o vessel segments, corresponding to the three NCSX field periods, in order to accommodate assembly of the device. The port extensions are welded on, leak checked, cut off within 1-inch of the vessel surface at MTM and then reattached at PPPL, to accommodate assembly of the close-fitting modular coils that surround the vessel. The 120 o vessel segments are formed by welding two 60 o segments together. Each 60 o segment is fabricated by welding ten press-formed panels together over a collapsible welding fixture which is needed to precisely position the panels. The vessel is joined at assembly by welding via custom machined 8-inch (20.3 cm) wide spacer ''spool pieces''. The vessel must have a total leak rate less than 5 X 10 -6 t-l/s, magnetic permeability less than 1.02(micro), and its contours must be within 0.188-inch (4.76 mm). It is scheduled for completion in January 2006

  8. Design & fabrication of cantilever array biosensors

    DEFF Research Database (Denmark)

    Boisen, Anja; Thundat, T

    2009-01-01

    Surface immobilization of functional receptors on microfabricated cantilever arrays offers a new paradigm for the development of biosensors based on nanomechanics. Microcantilever-based systems are capable of real-time, multiplexed detection of unlabeled disease markers in extremely small volumes......, electronic processing, and even local telemetry on a single chip have the potential of satisfying the need for highly sensitive and selective multiple-target detection in very small samples. Here we will review the design and fabrication process of cantilever-based biosensors....

  9. Fabrication of superhydrophobic cotton fabrics using crosslinking polymerization method

    Science.gov (United States)

    Jiang, Bin; Chen, Zhenxing; Sun, Yongli; Yang, Huawei; Zhang, Hongjie; Dou, Haozhen; Zhang, Luhong

    2018-05-01

    With the aim of removing and recycling oil and organic solvent from water, a facile and low-cost crosslinking polymerization method was first applied on surface modification of cotton fabrics for water/oil separation. Micro-nano hierarchical rough structure was constructed by triethylenetetramine (TETA) and trimesoyl chloride (TMC) that formed a polymeric layer on the surface of the fabric and anchored Al2O3 nanoparticles firmly between the fabric surface and the polymer layer. Superhydrophobic property was further obtained through self-assembly grafting of hydrophobic groups on the rough surface. The as-prepared cotton fabric exhibited superoleophilicity in atmosphere and superhydrophobicity both in atmosphere and under oil with the water contact angle of 153° and 152° respectively. Water/oil separation test showed that the as-prepared cotton fabric can handle with various oil-water mixtures with a high separation efficiency over 99%. More importantly, the separation efficiency remained above 98% over 20 cycles of reusing without losing its superhydrophobicity which demonstrated excellent reusability in oil/water separation process. Moreover, the as-prepared cotton fabric possessed good contamination resistance ability and self-cleaning property. Simulation washing process test showed the superhydrophobic cotton fabric maintained high value of water contact angle above 150° after 100 times washing, indicating great stability and durability. In summary, this work provides a brand-new way to surface modification of cotton fabric and makes it a promising candidate material for oil/water separation.

  10. CACAO facility. Radioactive targets at Orsay

    International Nuclear Information System (INIS)

    Bacri, C.O.; Petitbon-Thevenet, V.; Mottier, J.; Lefort, H.; Durnez, A.; Fortuna, F.

    2014-01-01

    CACAO, Chimie des Actinides et Cibles radioActives a Orsay (actinide chemistry and radioactive targets at Orsay), is a new laboratory dedicated to the fabrication and characterization of radioactive targets. It is supported by the radiochemistry group and the stable target service of the IPNO. The recurring needs of physicists working in the nuclear fuel cycle physics and the growing difficulties to obtain radioactive targets elsewhere were the main motivating factors behind the construction of this new laboratory. The first targets of 235,238 U and 232 Th have already been prepared although the full operating licenses still need to be obtained. In this paper, the installation and the equipment of CACAO will be described. An extensive study of a U test target fabricated by the CACAO laboratory has been performed and results are reported here. The different techniques used to characterize the deposit are presented and the outcome is discussed. (author)

  11. Refurbishment and open source software

    CSIR Research Space (South Africa)

    Mabuza, S

    2006-11-01

    Full Text Available  & Open Source Software Electronic Waste Management Conference 2006 Sibongile Mabuza 2 Presentation Outline  About Meraka Institute Open Source Centre  Background to OSS  Extending life span using OSS  Different choices for different situations  Examples of... = common grazing ground (Sesotho)  Shared space for creative productivity  Emphasise African nature of scope and needs 4 Meraka Open Source Centre  Open Source Centre is part of the Meraka  Institute.  Currently, there are two offices:  CSIR headquarters  Soweto  Set up to amplify the beneficial impact of...

  12. Closure of Microcosm for refurbishment

    CERN Multimedia

    2014-01-01

    Since 1994, the Microcosm exhibition has given the opportunity to visitors of all ages and backgrounds to have a first glimpse into the secrets of physics.   To ensure that Microcosm can continue fulfilling its educational aims at the same level of quality for many years to come, it is closing for renovation work on 8 December 2014 and is expected to reopen during Summer 2015. During the closure, the “Fun with Physics” workshop will not take place, but the Universe of Particles exhibition in the Globe and the Passport to the Big Bang circuit will remain accessible to the public, free of charge and with no need to book in advance.  Guided tours of CERN are also available (advance booking required via this page).

  13. Bruce A refurbishment - an update

    International Nuclear Information System (INIS)

    Liddle, R.

    2007-01-01

    Running slightly ahead of schedule on the critical path work, the Bruce A Restart Project has not been without its challenges. About a dozen major contractors with a workforce of 1,700 tradespeople share space inside the Units 1 and 2 Construction Island. They share support services, provided by project management contractor AMEC NCL, and they share the consequences when one part of the project advances ahead of schedule or another falls behind. They also share Bruce Power's safety values and are well on their way to surpassing five-million hours without an acute lost time injury. (author)

  14. Process for fabrication of cermets

    Science.gov (United States)

    Landingham, Richard L [Livermore, CA

    2011-02-01

    Cermet comprising ceramic and metal components and a molten metal infiltration method and process for fabrication thereof. The light weight cermets having improved porosity, strength, durability, toughness, elasticity fabricated from presintered ceramic powder infiltrated with a molten metal or metal alloy. Alumina titanium cermets biocompatible with the human body suitable for bone and joint replacements.

  15. CW RFQ fabrication and engineering

    International Nuclear Information System (INIS)

    Schrage, D.; Young, L.; Roybal, P.

    1998-01-01

    The design and fabrication of a four-vane RFQ to deliver a 100 mA CW proton beam at 6.7 MeV is described. This linac is an Oxygen-Free Electrolytic (OFE) copper structure 8 m in length and was fabricated using hydrogen furnace brazing as the joining technology

  16. DRAPING SIMULATION OF WOVEN FABRICS

    Energy Technology Data Exchange (ETDEWEB)

    Rodgers, William [General Motors LLC; Jin, Xiaoshi [ESI Group NA; Zhu, Jiang [Optimal CAE; Wathen, Terrence [General Motors LLC; Doroudian2, Mark [ESI Group NA; Aitharaju, Venkat [General Motors LLC

    2016-09-07

    Woven fabric composites are extensively used in molding complex geometrical shapes due to their high conformability compared to other fabrics. Preforming is an important step in the overall process, where the two-dimensional fabric is draped to become the three-dimensional shape of the part prior to resin injection. During preforming, the orientation of the yarns may change significantly compared to the initial orientations. Accurate prediction of the yarn orientations after molding is important for evaluating the structural performance of the final part. This paper presents a systematic investigation of the angle changes during the preform operation for carbon fiber twill and satin weave fabrics. Preforming experiments were conducted using a truncated pyramid mold geometry designed and fabricated at the General Motors Research Laboratories. Predicted results for the yarn orientations were compared with experimental results and good agreement was observed

  17. Antiproton Target

    CERN Multimedia

    1980-01-01

    Antiproton target used for the AA (antiproton accumulator). The first type of antiproton production target used from 1980 to 1982 comprised a rod of copper 3mm diameter and 120mm long embedded in a graphite cylinder that was itself pressed into a finned aluminium container. This assembly was air-cooled and it was used in conjunction with the Van der Meer magnetic horn. In 1983 Fermilab provided us with lithium lenses to replace the horn with a view to increasing the antiproton yield by about 30%. These lenses needed a much shorter target made of heavy metal - iridium was chosen for this purpose. The 50 mm iridium rod was housed in an extension to the original finned target container so that it could be brought very close to the entrance to the lithium lens. Picture 1 shows this target assembly and Picture 2 shows it mounted together with the lithium lens. These target containers had a short lifetime due to a combination of beam heating and radiation damage. This led to the design of the water-cooled target in...

  18. Secure Automated Fabrication: an overview of remote breeder fuel fabrication

    International Nuclear Information System (INIS)

    Nyman, D.H.; Graham, R.A.

    1983-10-01

    The Secure Automated Fabrication (SAF) line is an automated, remotely controlled breeder fuel pin fabrication process which is to be installed in the Fuels and Materials Examination Facility (FMEF). The FMEF is presently under construction at Hanford and is scheduled for completion in 1984. The SAF line is scheduled for startup in 1987 and will produce mixed uranium-plutonium fuel pins for the Fast Flux Test Facility (FFTF) and the Clinch River Breeder Reactor Plant (CRBRP). The fabrication line and support systems are described

  19. Refurbishment of uranium hexafluoride cylinder storage yards C-745-K, L, M, N, and P and construction of a new uranium hexafluoride cylinder storage yard (C-745-T) at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    International Nuclear Information System (INIS)

    1996-07-01

    The Paducah Gaseous Diffusion Plant (PGDP) is a uranium enrichment facility owned by the US Department of Energy (DOE). A residual of the uranium enrichment process is depleted uranium hexafluoride (UF6). Depleted UF6, a solid at ambient temperature, is stored in 32,200 steel cylinders that hold a maximum of 14 tons each. Storage conditions are suboptimal and have resulted in accelerated corrosion of cylinders, increasing the potential for a release of hazardous substances. Consequently, the DOE is proposing refurbishment of certain existing yards and construction of a new storage yard. This environmental assessment (EA) evaluates the impacts of the proposed action and no action and considers alternate sites for the proposed new storage yard. The proposed action includes (1) renovating five existing cylinder yards; (2) constructing a new UF6 storage yard; handling and onsite transport of cylinders among existing yards to accommodate construction; and (4) after refurbishment and construction, restacking of cylinders to meet spacing and inspection requirements. Based on the results of the analysis reported in the EA, DOE has determined that the proposed action is not a major Federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969. Therefore, DOE is issuing a Finding of No Significant Impact. Additionally, it is reported in this EA that the loss of less than one acre of wetlands at the proposed project site would not be a significant adverse impact

  20. Refurbishment of uranium hexafluoride cylinder storage yards C-745-K, L, M, N, and P and construction of a new uranium hexafluoride cylinder storage yard (C-745-T) at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    The Paducah Gaseous Diffusion Plant (PGDP) is a uranium enrichment facility owned by the US Department of Energy (DOE). A residual of the uranium enrichment process is depleted uranium hexafluoride (UF6). Depleted UF6, a solid at ambient temperature, is stored in 32,200 steel cylinders that hold a maximum of 14 tons each. Storage conditions are suboptimal and have resulted in accelerated corrosion of cylinders, increasing the potential for a release of hazardous substances. Consequently, the DOE is proposing refurbishment of certain existing yards and construction of a new storage yard. This environmental assessment (EA) evaluates the impacts of the proposed action and no action and considers alternate sites for the proposed new storage yard. The proposed action includes (1) renovating five existing cylinder yards; (2) constructing a new UF6 storage yard; handling and onsite transport of cylinders among existing yards to accommodate construction; and (4) after refurbishment and construction, restacking of cylinders to meet spacing and inspection requirements. Based on the results of the analysis reported in the EA, DOE has determined that the proposed action is not a major Federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969. Therefore, DOE is issuing a Finding of No Significant Impact. Additionally, it is reported in this EA that the loss of less than one acre of wetlands at the proposed project site would not be a significant adverse impact.

  1. MOX fuel fabrication at AECL

    International Nuclear Information System (INIS)

    Dimayuga, F.C.; Jeffs, A.T.

    1995-01-01

    Atomic Energy of Canada Limited's mixed-oxide (MOX) fuel fabrication activities are conducted in the Recycle Fuel Fabrication Laboratories (RFFL) at the Chalk River Laboratories. The RFFL facility is designed to produce experimental quantities of CANDU MOX fuel for reactor physics tests or demonstration irradiations. From 1979 to 1987, several MOX fuel fabrication campaigns were run in the RFFL, producing various quantities of fuel with different compositions. About 150 bundles, containing over three tonnes of MOX, were fabricated in the RFFL before operations in the facility were suspended. In late 1987, the RFFL was placed in a state of active standby, a condition where no fuel fabrication activities are conducted, but the monitoring and ventilation systems in the facility are maintained. Currently, a project to rehabilitate the RFFL and resume MOX fuel fabrication is nearing completion. This project is funded by the CANDU Owners' Group (COG). The initial fabrication campaign will consist of the production of thirty-eight 37-element (U,Pu)O 2 bundles containing 0.2 wt% Pu in Heavy Element (H.E.) destined for physics tests in the zero-power ZED-2 reactor. An overview of the Rehabilitation Project will be given. (author)

  2. Fabric circuits and method of manufacturing fabric circuits

    Science.gov (United States)

    Chu, Andrew W. (Inventor); Dobbins, Justin A. (Inventor); Scully, Robert C. (Inventor); Trevino, Robert C. (Inventor); Lin, Greg Y. (Inventor); Fink, Patrick W. (Inventor)

    2011-01-01

    A flexible, fabric-based circuit comprises a non-conductive flexible layer of fabric and a conductive flexible layer of fabric adjacent thereto. A non-conductive thread, an adhesive, and/or other means may be used for attaching the conductive layer to the non-conductive layer. In some embodiments, the layers are attached by a computer-driven embroidery machine at pre-determined portions or locations in accordance with a pre-determined attachment layout before automated cutting. In some other embodiments, an automated milling machine or a computer-driven laser using a pre-designed circuit trace as a template cuts the conductive layer so as to separate an undesired portion of the conductive layer from a desired portion of the conductive layer. Additional layers of conductive fabric may be attached in some embodiments to form a multi-layer construct.

  3. Fabrication of cotton fabric with superhydrophobicity and flame retardancy.

    Science.gov (United States)

    Zhang, Ming; Wang, Chengyu

    2013-07-25

    A simple and facile method for fabricating the cotton fabric with superhydrophobicity and flame retardancy is described in the present work. The cotton fabric with the maximal WCA of 160° has been prepared by the covalent deposition of amino-silica nanospheres and the further graft with (heptadecafluoro-1,1,2,2-tetradecyl) trimethoxysilane. The geometric microstructure of silica spheres was measured by transmission electron microscopy (TEM). The cotton textiles before and after treatment were characterized by using scanning electron microscope (SEM) and X-ray photoelectron spectroscopy (XPS). The wetting behavior of cotton samples was investigated by water contact angle measurement. Moreover, diverse performances of superhydrophobic cotton textiles have been evaluated as well. The results exhibited the outstanding superhydrophobicity, excellent waterproofing durability and flame retardancy of the cotton fabric after treatment, offering a good opportunity to accelerate the large-scale production of superhydrophobic textiles materials for new industrial applications. Copyright © 2013 Elsevier Ltd. All rights reserved.

  4. Fabrication of nanowires and nanostructures

    DEFF Research Database (Denmark)

    Mátéfi-Tempfli, Stefan; Mátéfi-Tempfli, M.; Piraux, L.

    2009-01-01

    We report on different approaches that we have adopted and developed for the fabrication of nanowires and nanostructures. Methods based on template synthesis and on self organization seem to be the most promising for the fabrication of nanomaterials and nanostructures due to their easiness and low...... cost. The development of a supported nanoporous alumina template and the possibility of using this template to combine electrochemical synthesis with lithographic methods open new ways for the fabrication of complex nanostructures. The numerous advantages of the supported template and its compatibility...

  5. Quantum Bridge Fabrication Using Photolithography

    International Nuclear Information System (INIS)

    Quinones, R.

    2001-01-01

    The need for high-speed performance electronics in computers integrated circuits and sensors, require the fabrication of low energy consumption diodes. Nano fabrication methods require new techniques and equipment. We are currently developing a procedure to fabricate a diode based on quantum-effects. The device will act like a traditional diode, but the nanometer scale will allow it to reach high speeds without over heating. This new diode will be on a nano-bridge so it can be attenuated by an electromagnetic wave. The goal is to obtain similar current vs voltage response as in a silicon diode

  6. Fabricating Copper Nanotubes by Electrodeposition

    Science.gov (United States)

    Yang, E. H.; Ramsey, Christopher; Bae, Youngsam; Choi, Daniel

    2009-01-01

    Copper tubes having diameters between about 100 and about 200 nm have been fabricated by electrodeposition of copper into the pores of alumina nanopore membranes. Copper nanotubes are under consideration as alternatives to copper nanorods and nanowires for applications involving thermal and/or electrical contacts, wherein the greater specific areas of nanotubes could afford lower effective thermal and/or electrical resistivities. Heretofore, copper nanorods and nanowires have been fabricated by a combination of electrodeposition and a conventional expensive lithographic process. The present electrodeposition-based process for fabricating copper nanotubes costs less and enables production of copper nanotubes at greater rate.

  7. Target technologies for laser inertial confinement fusion: state-of-the-art and future perspective

    International Nuclear Information System (INIS)

    Zhang Lin; Du Kai

    2013-01-01

    Targets are physical base of the laser inertial confinement fusion (ICF) researches. The quality of the targets has extremely important influences on the reliabilities and degree of precision of the ICF experimental results. The characteristics of the ICF targets, such as complexity and microscale, high precision, determine that the target fabrication process must be a system engineering. This paper presents progresses on the fabrication technologies of ICF targets. The existing problem and the future needs of ICF target fabrication technologies are also discussed. (authors)

  8. Fabrication of FORTIS

    Science.gov (United States)

    McCandliss, Stephan R.; Fleming, Brian; Kaiser, Mary Elizabeth; Kruk, Jeffrey; Feldman, Paul D.; Kutyrev, Alexander S.; Li, Mary J.; Goodwin, Phillip A.; Rapchun, David; Lyness, Eric; Brown, Ari D.; Moseley, Harvey; Siegmund, Oswald; Vallerga, John

    2010-07-01

    The Johns Hopkins University sounding rocket group is building the Far-ultraviolet Off Rowland-circle Telescope for Imaging and Spectroscopy (FORTIS), which is a Gregorian telescope with rulings on the secondary mirror. FORTIS will be launched on a sounding rocket from White Sand Missile Range to study the relationship between Lyman alpha escape and the local gas-to-dust ratio in star forming galaxies with non-zero redshifts. It is designed to acquire images of a 30' x 30' field and provide fully redundant "on-the-fly" spectral acquisition of 43 separate targets in the field with a bandpass of 900 - 1800 Angstroms. FORTIS is an enabling scientific and technical activity for future cutting edge far- and near-uv survey missions seeking to: search for Lyman continuum radiation leaking from star forming galaxies, determine the epoch of He II reionization and characterize baryon acoustic oscillations using the Lyman forest. In addition to the high efficiency "two bounce" dual-order spectro-telescope design, FORTIS incorporates a number of innovative technologies including: an image dissecting microshutter array developed by GSFC; a large area (~ 45 mm x 170 mm) microchannel plate detector with central imaging and "outrigger" spectral channels provided by Sensor Sciences; and an autonomous targeting microprocessor incorporating commercially available field programable gate arrays. We discuss progress to date in developing our pathfinder instrument.

  9. Natural fabric of Hildegardia populifolia composites

    CSIR Research Space (South Africa)

    Guduri, BBR

    2006-12-01

    Full Text Available The influence of Hildegardia populofolia fabric content, fabric orientation, sodium hydroxide (NaOH) and silane coupling agent treatment on the surface properties of the fabric, mechanical and fracture properties of Hildegardia populifolia...

  10. Properties of natural fabric Polyalthia cerasoides

    CSIR Research Space (South Africa)

    Jayaramudu, J

    2009-06-01

    Full Text Available of this fabric were compared with those of two natural fabrics reported in the literature. This uniaxial fabric has sufficient tensile modulus and can be used as reinforcement in the development of green composites....

  11. dena refurbishment investigation. Pt. 1. Efficiency of energetic modernization in the inventory of rented apartments. Accompanying research according to the dena project: ''Existing low-energy house''; dena-Sanierungsstudie. T. 1. Wirtschaftlichkeit energetischer Modernisierung im Mietwohnungsbestand. Begleitforschung zum dena-Projekt ''Niedrigenergiehaus im Bestand''. Bericht 2010

    Energy Technology Data Exchange (ETDEWEB)

    Discher, Henning [Deutsche Energie-Agentur GmbH, Berlin (Germany); Hinz, Eberhard; Enseling, Andreas [Institut Wohnen und Umwelt GmbH (IWU), Darmstadt (Germany)

    2010-12-08

    Due to the world-wide increasing energy demand, the strongly varying energy prices and not at least due to the effects of the climate change, politics, economics and science face great challenges. Energy efficiency in the building sector plays an important role in the reduction of energy consumption. An energetic modernization of the existing buildings is crucial toward achieving the goals of climate protection. Nevertheless there still exist caveas toward energy-efficient building and refurbishment. For the future, market constraints must purposefully be reduced and the chances of energy-efficient refurbishments have to be used.

  12. Fabrication of integrated metallic MEMS devices

    DEFF Research Database (Denmark)

    Yalcinkaya, Arda Deniz; Ravnkilde, Jan Tue; Hansen, Ole

    2002-01-01

    A simple and complementary metal oxide semiconductor (CMOS) compatible fabrication technique for microelectromechanical (MEMS) devices is presented. The fabrication technology makes use of electroplated metal layers. Among the fabricated devices, high quality factor microresonators are characteri......A simple and complementary metal oxide semiconductor (CMOS) compatible fabrication technique for microelectromechanical (MEMS) devices is presented. The fabrication technology makes use of electroplated metal layers. Among the fabricated devices, high quality factor microresonators...

  13. Power plant production of inertial confinement fusion targets

    International Nuclear Information System (INIS)

    Hendricks, C.D.; Johnson, W.L.

    1979-01-01

    Many of the current techniques for fabricating experimental targets appear to be directly extendable to the high-rate, low-cost production of reactor targets. This report describes several new techniques that, in conjunction with the expansion of existing techniques, can constitute a target factory. We have evaluated this concept on the basis of a generalized reactor target design and the projected specifications of reactor-grade targets

  14. Pilling Resistance of Knitted Fabrics

    Directory of Open Access Journals (Sweden)

    Gita BUSILIENĖ

    2011-09-01

    Full Text Available Knitted fabrics with different quantity of elastane, conspicuous by high viscosity and elasticity, having one of the most important performance properties - resistance to pilling are often used in the production of high quality sportswear. During technological process imitating operating conditions, the behaviour of knitted fabrics may be changed by different industrial softeners from 12 % to 20 % of active substance, for example fatty acid condensate (Tubingal 5051 or silicone micro emulsion (Tubingal SMF. The aim of this investigation is to define the influence of fibrous composition and chemical softeners to the propensity of fuzzing and pilling of plain and plated jersey pattern knitted fabrics. The results of investigations showed that fibrous composition and thickness of materials (up to 6 % and washing as well as softening (from 33 % to 67 % change the resistance of knitted fabrics to pilling.http://dx.doi.org/10.5755/j01.ms.17.3.597

  15. Geoacoustic Physical Model Fabrication Laboratory

    Data.gov (United States)

    Federal Laboratory Consortium — FUNCTION: Fabricates three-dimensional rough surfaces (e.g., fractals, ripples) out of materials such as PVC or wax to simulate the roughness properties associated...

  16. Fabricating plasmonic components for nanophotonics

    DEFF Research Database (Denmark)

    Boltasseva, Alexandra; Nielsen, Rasmus Bundgaard; Jeppesen, Claus

    2009-01-01

    We report on experimental realization of different metal-dielectric structures that are used as surface plasmon polariton waveguides and as plasmonic metamaterials. Fabrication approaches based on different lithographic and deposition techniques are discussed....

  17. New fabrication techniques for the nuclear fuels of tomorrow

    International Nuclear Information System (INIS)

    Babelot, J.F.; Bokelund, H.; Gerontopoulos, P.; Gueugnon, J.F.; Richter, K.

    1995-01-01

    The shift of the emphasis of the work at the Institute for Transuranium Elements (ITU) from the development of fuels based on uranium and plutonium to safety aspects concerning the use of plutonium and other of actinides, necessitates the production of targets containing appreciable amounts of minor actinides for irradiation experiments. The handling of minor actinides requires additional protective measures, combined with improved fuel fabrication techniques. The boundary conditions for a suitable process are flexibility, adaptability to remote control, and minimization of dust formation. A method based on the sol-gel fabrication technique meets these criteria, and was selected for the present developments at ITU. (author)

  18. Microencapsulation and fabrication of fuel pellets for inertial confinement fusion

    International Nuclear Information System (INIS)

    Nolen, R.L. Jr.; Kool, L.B.

    1981-01-01

    Various microencapsulation techniques were evaluated for fabrication of thermonuclear fuel pellets for use in existing experimental facilities studying inertial confinement fusion and in future fusion-power reactors. Coacervation, spray drying, in situ polymerization, and physical microencapsulation methods were employed. Highly spherical, hollow polymeric shells were fabricated ranging in size from 20 to 7000 micron. In situ polymerization microencapsulation with poly(methyl methacrylate) provided large shells, but problems with local wall defects still must be solved. Extension to other polymeric systems met with limited success. Requirements for inertial confinement fusion targets are described, as are the methods that were used

  19. Silicone nanocomposite coatings for fabrics

    Science.gov (United States)

    Eberts, Kenneth (Inventor); Lee, Stein S. (Inventor); Singhal, Amit (Inventor); Ou, Runqing (Inventor)

    2011-01-01

    A silicone based coating for fabrics utilizing dual nanocomposite fillers providing enhanced mechanical and thermal properties to the silicone base. The first filler includes nanoclusters of polydimethylsiloxane (PDMS) and a metal oxide and a second filler of exfoliated clay nanoparticles. The coating is particularly suitable for inflatable fabrics used in several space, military, and consumer applications, including airbags, parachutes, rafts, boat sails, and inflatable shelters.

  20. Safeguards through secure automated fabrication

    International Nuclear Information System (INIS)

    DeMerschman, A.W.; Carlson, R.L.

    1982-01-01

    Westinghouse Hanford Company, a prime contractor for the U.S. Department of Energy, is constructing the Secure Automated Fabrication (SAF) line for fabrication of mixed oxide breeder fuel pins. Fuel processing by automation, which provides a separation of personnel from fuel handling, will provide a means whereby advanced safeguards concepts will be introduced. Remote operations and the inter-tie between the process computer and the safeguards computer are discussed

  1. Targeted Learning

    CERN Document Server

    van der Laan, Mark J

    2011-01-01

    The statistics profession is at a unique point in history. The need for valid statistical tools is greater than ever; data sets are massive, often measuring hundreds of thousands of measurements for a single subject. The field is ready to move towards clear objective benchmarks under which tools can be evaluated. Targeted learning allows (1) the full generalization and utilization of cross-validation as an estimator selection tool so that the subjective choices made by humans are now made by the machine, and (2) targeting the fitting of the probability distribution of the data toward the targe

  2. Target preparation

    International Nuclear Information System (INIS)

    Hinn, G.M.

    1984-01-01

    A few of the more interesting of the 210 targets prepared in the Laboratory last year are listed. In addition the author continues to use powdered silver mixed with /sup 9,10/BeO to produce sources for accelerator radio dating of Alaskan and South Polar snow. Currently, he is trying to increase production by multiple sample processing. Also the author routinely makes 3 μg/cm 2 cracked slacked carbon stripper foils and is continuing research with some degree of success in making enriched 28 Si targets starting with the oxide

  3. ITER Central Solenoid Module Fabrication

    Energy Technology Data Exchange (ETDEWEB)

    Smith, John [General Atomics, San Diego, CA (United States)

    2016-09-23

    The fabrication of the modules for the ITER Central Solenoid (CS) has started in a dedicated production facility located in Poway, California, USA. The necessary tools have been designed, built, installed, and tested in the facility to enable the start of production. The current schedule has first module fabrication completed in 2017, followed by testing and subsequent shipment to ITER. The Central Solenoid is a key component of the ITER tokamak providing the inductive voltage to initiate and sustain the plasma current and to position and shape the plasma. The design of the CS has been a collaborative effort between the US ITER Project Office (US ITER), the international ITER Organization (IO) and General Atomics (GA). GA’s responsibility includes: completing the fabrication design, developing and qualifying the fabrication processes and tools, and then completing the fabrication of the seven 110 tonne CS modules. The modules will be shipped separately to the ITER site, and then stacked and aligned in the Assembly Hall prior to insertion in the core of the ITER tokamak. A dedicated facility in Poway, California, USA has been established by GA to complete the fabrication of the seven modules. Infrastructure improvements included thick reinforced concrete floors, a diesel generator for backup power, along with, cranes for moving the tooling within the facility. The fabrication process for a single module requires approximately 22 months followed by five months of testing, which includes preliminary electrical testing followed by high current (48.5 kA) tests at 4.7K. The production of the seven modules is completed in a parallel fashion through ten process stations. The process stations have been designed and built with most stations having completed testing and qualification for carrying out the required fabrication processes. The final qualification step for each process station is achieved by the successful production of a prototype coil. Fabrication of the first

  4. Developing Fabrication Technologies to Provide On Demand Manufacturing for Exploration of the Moon and Mars

    Science.gov (United States)

    Hammond, Monica S.; Good, James E.; Gilley, Scott D.; Howard, Richard W.

    2006-01-01

    NASA's human exploration initiative poses great opportunity and risk for manned and robotic missions to the Moon, Mars, and beyond. Engineers and scientists at the Marshall Space Flight Center (MSFC) are developing technologies for in situ fabrication capabilities during lunar and Martian surface operations utilizing provisioned and locally refined materials. Current fabrication technologies must be advanced to support the special demands and applications of the space exploration initiative such as power, weight and volume constraints. In Situ Fabrication and Repair (ISFR) will advance state-of-the-art technologies in support of habitat structure development, tools, and mechanical part fabrication. The repair and replacement of space mission components, such as life support items or crew exercise equipment, fall within the ISFR scope. This paper will address current fabrication technologies relative to meeting ISFR targeted capabilities, near-term advancement goals, and systematic evaluation of various fabrication methods.

  5. Development of Low-Cost Method for Fabrication of Metal Neutron Guides

    Energy Technology Data Exchange (ETDEWEB)

    Engelhaupt, Darell [Dawn Research Inc., Madison, AL (United States); Khaykovich, Boris [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Romaine, Suzanne [Harvard-Smithsonian Center for Astrophysics, Cambridge, MA (United States)

    2017-12-19

    Neutron scattering is one of the most useful methods of studying the structure and dynamics of matter. US DOE neutron scattering research facilities at Oak Ridge National Laboratory are among the World’s most advanced, providing researchers with unmatched capabilities for probing the structure and properties of materials, including engineering and biological systems. This task is to develop a lower cost process to optimize and produce the required neutron guides capable of efficiently delivering neutron beams for tens of meters between neutron moderators and instruments. Therefore, our effort is to improve the performance and lower the production cost of neutron guides. Our approach aims at improving guide quality while controlling their rising costs by adopting a novel electroforming replication approach to their fabrication. These guides will be especially advantageous when used near the neutron source since the radiation resistance of nickel is superior to glass. Additionally, we are depositing low-stress nickel from an extremely low impurity solution completely free of stress-reducing agents, which nominally contain and impart sulfur, carbon and other elements that potentially activate in the neutron environment. This is achieved by using a pulsed periodically reversed current methodology. The best guides quote waviness of 0.1 mrad. It is reasonable to prepare just one mandrel of about 0.5 m long, for production of tens of guide segments, saving both the cost and supply time of guides to neutron facilities. We estimate that we can fabricate a single mandrel for the current cost of an individual one-meter guide, but from this, we can produce tens of meters of guide very inexpensively without mandrel refurbishment. While a multilayer coating will add to the overall cost, we expect this will be less than that of commercially available guides today. Therefore, we will produce higher quality guides, which are less susceptible to radiation damage, at the lower cost

  6. A facile method to fabricate superhydrophobic cotton fabrics

    Science.gov (United States)

    Zhang, Ming; Wang, Shuliang; Wang, Chengyu; Li, Jian

    2012-11-01

    A facile and novel method for fabricating superhydrophobic cotton fabrics is described in the present work. The superhydrophobic surface has been prepared by utilizing cationic poly (dimethyldiallylammonium chloride) and silica particles together with subsequent modification of (heptadecafluoro-1,1,2,2-tetradecyl) trimethoxysilane. The size distribution of silica particles was measured by Particle Size Analyzer. The cotton textiles before and after treatment were characterized by using scanning electron microscope (SEM) and X-ray photoelectron spectroscopy (XPS). The wetting behavior of cotton samples was investigated by water contact angle measurement. Moreover, the superhydrophobic durability of coated cotton textiles has been evaluated by exposure, immersion and washing tests. The results show that the treated cotton fabrics exhibited excellent chemical stability and outstanding non-wettability with the WCA of 155 ± 2°, which offers an opportunity to accelerate the large-scale production of superhydrophobic textiles materials for new industrial applications.

  7. Preparation of thin nuclear targets

    International Nuclear Information System (INIS)

    Muggleton, A.H.F.

    1979-03-01

    Thin film backings, sources and targets are needed for many applications in low energy nuclear physics and nuclear chemistry experiments. A survey of techniques used in the preparation of nuclear targets is first briefly discussed. These are classified as chemical, mechanical and physical preparations. Vacuum evaporation, being the most generally used technique, is discussed in detail. It is highly desirable to monitor the film thickness and control the deposition rate during evaporation and to measure the final target thickness after deposition has concluded. The relative merits of various thickness measuring techniques are described. Stages in the fabrication and mounting of self-supporting foils are described in detail, with emphasis given to the preparation of thin self-supporting carbon foils used as target backings and stripper foils. Various target backings, and the merits of the more generally used release agents are described in detail. The preparations of more difficult elemental targets are discussed, and a comprehensive list of the common targets is presented

  8. Fabrication of Nanoimprint stamps for photonic crystals

    International Nuclear Information System (INIS)

    Kouba, J; Kubenz, M; Mai, A; Ropers, G; Eberhardt, W; Loechel, B

    2006-01-01

    We report on fabrication of nanoimprint stamps for fabrication of two dimensional photonic crystals in visible range of spectra. Nanoimprint stamps made of silicon and/or nickel were successfully fabricated using electron beam lithography and advanced dry etching techniques. The quality of the stamps was evaluated using scanning electron microscopy. The fabricated stamps were also evaluated by imprinting them into suitable polymer materials

  9. 14 CFR 23.605 - Fabrication methods.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fabrication methods. 23.605 Section 23.605... Fabrication methods. (a) The methods of fabrication used must produce consistently sound structures. If a... fabrication method must be substantiated by a test program. [Doc. No. 4080, 29 FR 17955, Dec. 18, 1964; 30 FR...

  10. 14 CFR 29.605 - Fabrication methods.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fabrication methods. 29.605 Section 29.605... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction General § 29.605 Fabrication methods. (a) The methods of fabrication used must produce consistently sound structures. If a fabrication process...

  11. 14 CFR 27.605 - Fabrication methods.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fabrication methods. 27.605 Section 27.605... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction General § 27.605 Fabrication methods. (a) The methods of fabrication used must produce consistently sound structures. If a fabrication process (such as...

  12. 14 CFR 25.605 - Fabrication methods.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fabrication methods. 25.605 Section 25.605... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction General § 25.605 Fabrication methods. (a) The methods of fabrication used must produce a consistently sound structure. If a fabrication process...

  13. Metallic Reactor Fuel Fabrication for SFR

    Energy Technology Data Exchange (ETDEWEB)

    Song, Hoon; Kim, Jong-Hwan; Ko, Young-Mo; Woo, Yoon-Myung; Kim, Ki-Hwan; Lee, Chan-Bock [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    The metal fuel for an SFR has such advantages such as simple fabrication procedures, good neutron economy, high thermal conductivity, excellent compatibility with a Na coolant, and inherent passive safety 1. U-Zr metal fuel for SFR is now being developed by KAERI as a national R and D program of Korea. The fabrication technology of metal fuel for SFR has been under development in Korea as a national nuclear R and D program since 2007. The fabrication process for SFR fuel is composed of (1) fuel slug casting, (2) loading and fabrication of the fuel rods, and (3) fabrication of the final fuel assemblies. Fuel slug casting is the dominant source of fuel losses and recycled streams in this fabrication process. Fabrication on the rod type metallic fuel was carried out for the purpose of establishing a practical fabrication method. Rod-type fuel slugs were fabricated by injection casting. Metallic fuel slugs fabricated showed a general appearance was smooth.

  14. Electromagnetic micropores: fabrication and operation.

    Science.gov (United States)

    Basore, Joseph R; Lavrik, Nickolay V; Baker, Lane A

    2010-12-21

    We describe the fabrication and characterization of electromagnetic micropores. These devices consist of a micropore encompassed by a microelectromagnetic trap. Fabrication of the device involves multiple photolithographic steps, combined with deep reactive ion etching and subsequent insulation steps. When immersed in an electrolyte solution, application of a constant potential across the micropore results in an ionic current. Energizing the electromagnetic trap surrounding the micropore produces regions of high magnetic field gradients in the vicinity of the micropore that can direct motion of a ferrofluid onto or off of the micropore. This results in dynamic gating of the ion current through the micropore structure. In this report, we detail fabrication and characterize the electrical and ionic properties of the prepared electromagnetic micropores.

  15. Integrated Fabrication of a Microgripper

    Institute of Scientific and Technical Information of China (English)

    1999-01-01

    Successful implementation of simple mechanism on silicon chip is a prerequisite for monolithic microrobot-ic systems. This paper describes the integrated fabrication of polycrystalline silicon microgripper. Link, fixed andactive joint, and sliding flange structures with dimensions of micrometers have been fabricated on the substrate ofmonocrystalline silicon using silicon microfabrication technology. This microgripper, which may be applied to trans-ducers or sensors, can be batch-fabricated in IC-compatible process. The movable mechanical elements are built onlayers that are later removed, so that they are free for translation and rotation. Under external driving, a microgrip-per cut from substrate would be able to catch tiny filament or small particle with dimension of 10~ 200 micrometers.

  16. Cascade reactor: granule fabrication processes

    International Nuclear Information System (INIS)

    Erlandson, O.D.; Winkler, E.O.; Maya, I.; Pitts, J.H.

    1985-01-01

    A key feature of Cascade is the granular blanket. Of the many blanket material options open to Cascade, fabrication of Li 2 O granules was felt to offer the greatest challenge. The authors explored available methods for initial Li 2 O granule fabrication. They identified three cost-effective processes for fabricating Li 2 O granules: the VSM drop-melt furnace process, which is based on melting and spheroidizing irregularly shaped Li 2 O feed granules; the LiOH process, which spheroidizes liquefied LiOH and uses GA Technologies' sphere-forming procedures; and the Li 2 CO 3 sol-gel process, used for making spherical fuel particles for the high-temperature gas-cooled reactor (HTGR). Each process is described below

  17. SRF Cavity Fabrication and Materials

    CERN Document Server

    Singer, W

    2014-07-17

    The technological and metallurgical requirements of material for highgradient superconducting cavities are described. High-purity niobium, as the preferred metal for the fabrication of superconducting accelerating cavities, should meet exact specifications. The content of interstitial impurities such as oxygen, nitrogen, and carbon must be below 10μg/g. The hydrogen content should be kept below 2μg/g to prevent degradation of the Q-value under certain cool-down conditions. The material should be free of flaws (foreign material inclusions or cracks and laminations) that can initiate a thermal breakdown. Defects may be detected by quality control methods such as eddy current scanning and identified by a number of special methods. Conventional and alternative cavity fabrication methods are reviewed. Conventionally, niobium cavities are fabricated from sheet niobium by the formation of half-cells by deep drawing, followed by trim machining and Electron-Beam Welding (EBW). The welding of half-cells is a delicate...

  18. Stirling Microregenerators Fabricated and Tested

    Science.gov (United States)

    Moran, Matthew E.

    2004-01-01

    A mesoscale Stirling refrigerator patented by the NASA Glenn Research Center is currently under development. This refrigerator has a predicted efficiency of 30 percent of Carnot and potential uses in electronics, sensors, optical and radiofrequency systems, microarrays, and microsystems. The mesoscale Stirling refrigerator is most suited to volume-limited applications that require cooling below the ambient or sink temperature. Primary components of the planar device include two diaphragm actuators that replace the pistons found in traditional-scale Stirling machines and a microregenerator that stores and releases thermal energy to the working gas during the Stirling cycle. Diaphragms are used to eliminate frictional losses and bypass leakage concerns associated with pistons, while permitting reversal of the hot and cold sides of the device during operation to allow precise temperature control. Three candidate microregenerators were fabricated under NASA grants for initial evaluation: two constructed of porous ceramic, which were fabricated by Johns Hopkins Applied Physics Laboratory, and one made of multiple layers of nickel and photoresist, which was fabricated by Polar Thermal Technologies. The candidate regenerators are being tested by Johns Hopkins Applied Physics in a custom piezoelectric-actuated test apparatus designed to produce the Stirling refrigeration cycle. In parallel with the regenerator testing, Johns Hopkins is using deep reactive ion etching to fabricate electrostatically driven, comb-drive diaphragm actuators. These actuators will drive the Stirling cycle in the prototype device. The top photograph shows the porous ceramic microregenerators. Two microregenerators were fabricated with coarse pores and two with fine pores. The bottom photograph shows the test apparatus parts for evaluating the microregenerators, including the layered nickel-and-photoresist regenerator fabricated using LIGA techniques.

  19. Advanced fabrication of hyperbolic metamaterials

    DEFF Research Database (Denmark)

    Shkondin, Evgeniy; Sukham, Johneph; Panah, Mohammad Esmail Aryaee

    2017-01-01

    Hyperbolic metamaterials can provide unprecedented properties in accommodation of high-k (high wave vector) waves and enhancement of the optical density of states. To reach such performance the metamaterials have to be fabricated with as small imperfections as possible. Here we report on our...... advances in two approaches in fabrication of optical metamaterials. We deposit ultrathin ultrasmooth gold layers with the assistance of organic material (APTMS) adhesion layer. The technology supports the stacking of such layers in a multiperiod construction with alumina spacers between gold films, which...

  20. MQXFS1 Quadrupole Fabrication Report

    CERN Document Server

    Ambrosio, G; Bossert, R; Cavanna, E; Cheng, D; Chlachidize, G; Cooley, L D; Dietderich, D; Felice, H; Ferracin, P; Ghosh, A; Hafalia, R; Holik, E F; Izquierdo Bermudez, S; Juchno, M; Krave, S; Marchevsky, M; Muratore, J; Nobrega, F; Pan, H; Perez, J C; Pong, I; Prestemon, S; Ravaioli, E; Sabbi, G L; Santini, C; Schmalzle, J; Schmalzle, J; Stoynev, S; Strauss, T; Vallone, G; Wanderer, P; Wang, X; Yu, M

    2017-01-01

    This report presents the fabrication and QC data of MQXFS1, the first short model of the low-beta quadrupoles (MQXF) for the LHC High Luminosity Upgrade. It describes the conductor, the coils, and the structure that make the MQXFS1 magnet. Qualification tests and non-conformities are also presented and discussed. The fabrication of MQXFS1 was started before the finalization of conductor and coil design for MQXF magnets. Two strand design were used (RRP 108/127 and RRP 132/169). Cable and coil cross-sections were “first generation”.

  1. MQXFS1 Quadrupole Fabrication Report

    Energy Technology Data Exchange (ETDEWEB)

    Ambrosio, G. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Anerella, M. [Brookhaven National Lab. (BNL), Upton, NY (United States); Bossert, R. [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Cavanna, E. [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Cheng, D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Chlachidize, G. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Cooley, L. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Dietderich, D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Felice, H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Ferracin, P. [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Ghosh, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Hafalia, R. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Holik, E. F. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Bermudez, S. Izquierdo [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Juchno, M. [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Krave, S. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Marchevsky, M. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Muratore, J. [Brookhaven National Lab. (BNL), Upton, NY (United States); Nobrega, F. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Pan, H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Perez, J. C. [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Pong, I. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Prestemon, S. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Ravaioli, E. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sabbi, G. L. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Santini, C. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Schmalzle, J. [Brookhaven National Lab. (BNL), Upton, NY (United States); Stoynev, S. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Strauss, T. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Vallone, G. [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Wanderer, P. [Brookhaven National Lab. (BNL), Upton, NY (United States); Wang, X. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Yu, M. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2017-07-16

    This report presents the fabrication and QC data of MQXFS1, the first short model of the low-beta quadrupoles (MQXF) for the LHC High Luminosity Upgrade. It describes the conductor, the coils, and the structure that make the MQXFS1 magnet. Qualification tests and non-conformities are also presented and discussed. The fabrication of MQXFS1 was started before the finalization of conductor and coil design for MQXF magnets. Two strand design were used (RRP 108/127 and RRP 132/169). Cable and coil cross-sections were “first generation”.

  2. The Flexible Fabric of Space

    Science.gov (United States)

    VanNorsdall, Erin Leigh

    2015-08-01

    This poster will clearly illustrate my understanding of how the fabric of space behaves. The poster will be on a large trampoline with a heavy bowling ball in the center. The observer will be able to clearly understand the much more complicated property of how an object in space, such as a star, literally bends the fabric of the space around as a result of its density. This will also help to explain, in very simple terms, how space-time is bendable, and therefore, travel in space can be as well.

  3. Fabrication technology and characteristics of AmO2-MgO cercer materials for transmutation

    International Nuclear Information System (INIS)

    Croixmarie, Y.; Mocellin, A.; Warin, D.

    2000-01-01

    This paper deals with the fabrication technology and the physico-chemical properties of target materials prepared for the ECRIX experiment in the French PHENIX reactor. The ECRIX target materials consist of pellets made of a ceramic-ceramic type composite in which particles of americium oxide are microdispersed in an inert matrix of magnesium oxide

  4. Fabrication of small-orifice fuel injectors for diesel engines.

    Energy Technology Data Exchange (ETDEWEB)

    Woodford, J. B.; Fenske, G. R.

    2005-04-08

    Diesel fuel injector nozzles with spray hole diameters of 50-75 {micro}m have been fabricated via electroless nickel plating of conventionally made nozzles. Thick layers of nickel are deposited onto the orifice interior surfaces, reducing the diameter from {approx}200 {micro}m to the target diameter. The nickel plate is hard, smooth, and adherent, and covers the orifice interior surfaces uniformly.

  5. Autonomous Rover Traverse and Precise Arm Placement on Remotely Designated Targets

    Science.gov (United States)

    Felder, Michael; Nesnas, Issa A.; Pivtoraiko, Mihail; Kelly, Alonzo; Volpe, Richard

    2011-01-01

    Exploring planetary surfaces typically involves traversing challenging and unknown terrain and acquiring in-situ measurements at designated locations using arm-mounted instruments. We present field results for a new implementation of an autonomous capability that enables a rover to traverse and precisely place an arm-mounted instrument on remote targets. Using point-and-click mouse commands, a scientist designates targets in the initial imagery acquired from the rover's mast cameras. The rover then autonomously traverse the rocky terrain for a distance of 10 - 15 m, tracks the target(s) of interest during the traverse, positions itself for approaching the target, and then precisely places an arm-mounted instrument within 2-3 cm from the originally designated target. The rover proceeds to acquire science measurements with the instrument. This work advances what has been previously developed and integrated on the Mars Exploration Rovers by using algorithms that are capable of traversing more rock-dense terrains, enabling tight thread-the-needle maneuvers. We integrated these algorithms on the newly refurbished Athena Mars research rover and fielded them in the JPL Mars Yard. We conducted 43 runs with targets at distances ranging from 5 m to 15 m and achieved a success rate of 93% for placement of the instrument within 2-3 cm.

  6. Fabrication Aware Form-finding

    DEFF Research Database (Denmark)

    Egholm Pedersen, Ole; Larsen, Niels Martin; Pigram, Dave

    2014-01-01

    This paper describes a design and construction method that combines two distinct material systems with fabrication aware form-finding and file-to-factory workflows. The method enables the fluent creation of complex materially efficient structures comprising high populations of geometrically uniqu...

  7. Nuclear fuel fabrication in India

    Energy Technology Data Exchange (ETDEWEB)

    Kondal Rao, N

    1975-01-01

    The important role of a nuclear power program in meeting the growing needs of power in India is explained. The successful installation of Tarapur Atomic Power Station and Rajasthan Atomic Power Station as well as the work at Madras Atomic Power Station are described. The development of the Atomic Fuels Division and the Nuclear Fuel Complex, Hyderabad which is mainly concerned with the fabrication of fuel elements and the reprocessing of fuels are explained. The N.F.C. essentially has the following constituent units : Zirconium Plant (ZP) comprising of Zirconium Oxide Plant, Zirconium Sponge Plant and Zirconium Fabrication Plant; Natural Uranium Oxide Plant (UOP); Ceramic Fuel Fabrication Plant (CFFP); Enriched Uranium Oxide Plant (EUOP); Enriched Fuel Fabrication Plant (EEFP) and Quality Control Laboratory for meeting the quality control requirements of all plants. The capacities of various plants at the NFC are mentioned. The work done on mixed oxide fuels and FBTR core with blanket assemblies, nickel and steel assemblies, thermal research reactor of 100 MW capacity, etc. are briefly mentioned.

  8. Fabrication of green polymeric membranes

    KAUST Repository

    Kim, Dooli; Nunes, Suzana Pereira

    2017-01-01

    Provided herein are methods of fabricating membranes using polymers with functionalized groups such as sulfone (e.g., PSf and PES), ether (e.g., PES), acrylonitrile (e.g., PAN), fluoride(e.g., pvdf and other fluoropolymers), and imide (e.g., extem) and ionic liquids. Also provided are membranes made by the provided methods.

  9. Gas-filled hohlraum fabrication

    International Nuclear Information System (INIS)

    Salazar, M.A.; Gobby, P.L.; Foreman, L.R.; Bush, H. Jr.; Gomez, V.M.; Moore, J.E.; Stone, G.F.

    1995-01-01

    Los Alamos National Laboratory (LANL) researchers have fabricated and fielded gas-filled hohlraums at the Lawrence Livermore National Laboratory (LLNL) Nova laser. Fill pressures of 1--5 atmospheres have been typical. We describe the production of the parts, their assembly and fielding. Emphasis is placed on the production of gas-tight polyimide windows and the fielding apparatus and procedure

  10. Nuclear fuel fabrication in India

    International Nuclear Information System (INIS)

    Kondal Rao, N.

    1975-01-01

    The important role of a nuclear power programme in meeting the growing needs of power in India is explained. The successful installation of Tarapur Atomic Power Station and Rajasthan Atomic Power Station as well as the work at Madras Atomic Power Station are described. The development of the Atomic Fuels Division and the Nuclear Fuel Complex, Hyderabad which is mainly concerned with the fabrication of fuel elements and the reprocessing of fuels are explained. The N.F.C. essentially has the following constituent units : Zirconium Plant (ZP) comprising of Zirconium Oxide Plant, Zirconium Sponge Plant and Zirconium Fabrication Plant; Natural Uranium Oxide Plant (UOP); Ceramic Fuel Fabrication Plant (CFFP); Enriched Uranium Oxide Plant (EUOP); Enriched Fuel Fabrication Plant (EEFP) and Quality Control Laboratory for meeting the quality control requirements of all plants. The capacities of various plants at the NFC are mentioned. The work done on mixed oxide fuels and FBTR core with blanket assemblies, nickel and steel assemblies, thermal research reactor of 100 MW capacity, etc. are briefly mentioned. (K.B.)

  11. Fabrication of green polymeric membranes

    KAUST Repository

    Kim, Dooli

    2017-06-16

    Provided herein are methods of fabricating membranes using polymers with functionalized groups such as sulfone (e.g., PSf and PES), ether (e.g., PES), acrylonitrile (e.g., PAN), fluoride(e.g., pvdf and other fluoropolymers), and imide (e.g., extem) and ionic liquids. Also provided are membranes made by the provided methods.

  12. The Fabrication of Qualified Citizens

    DEFF Research Database (Denmark)

    Andrade-Molina, Melissa

    2017-01-01

    a rhizomatic analytical move, a historization of the present is deployed to map the fabrication of the desired qualified citizen in Chile. The analysis evidences the (re)production of dominant narratives about the “qualified citizen” are and have been entangled with the functioning of school geometry...

  13. Fabrication of elliptical SRF cavities

    Science.gov (United States)

    Singer, W.

    2017-03-01

    The technological and metallurgical requirements of material for high-gradient superconducting cavities are described. High-purity niobium, as the preferred metal for the fabrication of superconducting accelerating cavities, should meet exact specifications. The content of interstitial impurities such as oxygen, nitrogen, and carbon must be below 10 μg g-1. The hydrogen content should be kept below 2 μg g-1 to prevent degradation of the quality factor (Q-value) under certain cool-down conditions. The material should be free of flaws (foreign material inclusions or cracks and laminations) that can initiate a thermal breakdown. Traditional and alternative cavity mechanical fabrication methods are reviewed. Conventionally, niobium cavities are fabricated from sheet niobium by the formation of half-cells by deep drawing, followed by trim machining and electron beam welding. The welding of half-cells is a delicate procedure, requiring intermediate cleaning steps and a careful choice of weld parameters to achieve full penetration of the joints. A challenge for a welded construction is the tight mechanical and electrical tolerances. These can be maintained by a combination of mechanical and radio-frequency measurements on half-cells and by careful tracking of weld shrinkage. The main aspects of quality assurance and quality management are mentioned. The experiences of 800 cavities produced for the European XFEL are presented. Another cavity fabrication approach is slicing discs from the ingot and producing cavities by deep drawing and electron beam welding. Accelerating gradients at the level of 35-45 MV m-1 can be achieved by applying electrochemical polishing treatment. The single-crystal option (grain boundary free) is discussed. It seems that in this case, high performance can be achieved by a simplified treatment procedure. Fabrication of the elliptical resonators from a seamless pipe as an alternative is briefly described. This technology has yielded good

  14. Synthesis, processing and characterization of shear thickening fluid (STF) impregnated fabric composites

    International Nuclear Information System (INIS)

    Hassan, Tarig A.; Rangari, Vijay K.; Jeelani, Shaik

    2010-01-01

    Shear thickening is a non-Newtonian fluid behavior defined as the increase of viscosity with the increase in the applied shear rate. The shear thickening fluid (STF) is a combination of hard metal oxide particles suspended in a liquid polymer. This mixture of flowable and hard components at a particular composition, results in a material with remarkable properties. In this manuscript the shear thickening fluid (STF) was prepared by ultrasound irradiation of silica nanoparticles dispersed in liquid polyethylene glycol polymer. The as-prepared STFs have been tested for their rheological and thermal properties. Kevlar and Nylon fabrics were soaked in STF/ethanol solution to make STF/fabric composite. Knife threats and quasistatic penetration tests were performed on the neat fabrics and STF/fabric composite targets for both engineered spike and knife on areal density basis. The results showed that STF impregnated fabrics have better penetration resistance as compared to neat fabrics without affecting the fabric flexibility. This indicates that the addition of STF to the fabric have enhanced the fabric performance and can be used in liquid body armor applications.

  15. Novel fabric pressure sensors: design, fabrication, and characterization

    International Nuclear Information System (INIS)

    Wang, Yangyong; Hua, Tao; Zhu, Bo; Li, Qiao; Yi, Weijing; Tao, Xiaoming

    2011-01-01

    Soft and pliable pressure sensors are essential elements in wearable electronics which have wide applications in modern daily lives. This paper presents a family of fabric pressure sensors made by sandwiching a piece of resistive fabric strain sensing element between two tooth-structured layers of soft elastomers. The pressure sensors are capable of measuring pressure from 0 to 2000 kPa, covering the whole range of human–machine interactions. A pressure sensitivity of up to 2.98 × 10 −3 kPa −1 was obtained. Theoretical modeling was conducted based on an energy method to predict the load–displacement relationship for various sensor configurations. By adjusting the Young's modulus of the two conversion layers, as well as the geometrical dimensions, the measurement ranges, and sensitivities of the sensors can be quantitatively determined. The sensors are being used for pressure measurements between the human body and garments, shoes, beds, and chairs

  16. Preparation of activated carbon fabrics from cotton fabric precursor

    Science.gov (United States)

    Salehi, R.; Dadashian, F.; Abedi, M.

    2017-10-01

    The preparation of activated carbon fabrics (ACFs) from cotton fabric was performed by chemical activation with phosphoric acid (H3PO4). The operation conditions for obtaining the ACFs with the highest the adsorption capacity and process yield, proposed. Optimized conditions were: impregnation ratio of 2, the rate of temperature rising of 7.5 °C min-1, the activation temperature of 500 °C and the activation time of 30 min. The ACFs produced under optimized conditions was characterized by scanning electron microscopy (SEM) and energy dispersive X-ray spectroscopy (EDX). The surface area and pore volume of carbon nanostructures was characterized by BET nitrogen adsorption isotherm at 77 °K. The pore size distribution calculated from the desorption branch according to BJH method. The iodine number of the prepared ACFs was determined by titration at 30 °C based on the ASTM D4607-94. The results showed the improvement of porous structure, fabric shape, surface area (690 m2/g), total pore volume (0.3216 cm3/g), and well-preserved fibers integrity.

  17. Qualitative Investigation of Some Locally Produced Printed Fabrics ...

    African Journals Online (AJOL)

    The results obtained showed that the locally produced fabrics exhibited comparably better end – use performance characteristics in terms of fabric weight per square meter, fabric flammability, and linear density. While the foreign fabrics are better in terms of Crease recovery, fabric handle, fabric sett, fabric shrinkage, and ...

  18. Fabrication of superconducting niobium radio frequency structures

    International Nuclear Information System (INIS)

    Kirchgessner, J.; Amato, J.; Brawley, J.

    1983-01-01

    During the last several years a variety of superconducting radio frequency structures have been designed, fabricated and tested. The diverse structures and fabrication techniques are described. This paper is a description of the authors' experiences in this field

  19. Fabric quality issues related to apparel merchandising

    CSIR Research Space (South Africa)

    Das, Sonali

    2015-02-01

    Full Text Available The objectives of this study are to develop an understanding of fabric quality related issues and research gaps relevant to apparel manufacturing and merchandising within the South African context. The specific focus is on fabric objective...

  20. DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR

    International Nuclear Information System (INIS)

    Unknown

    2002-01-01

    The objectives of this report period were to complete the development of the Gas Generator design, which was done; fabricate and test of the non-polluting unique power turbine drive gas Gas Generator, which has been postponed. Focus during this report period has been to complete the brazing and bonding necessary to fabricate the Gas Generator hardware, continue making preparations for fabricating and testing the Gas Generator, and continuing the fabrication of the Gas Generator hardware and ancillary hardware in preparation for the test program. Fabrication is more than 95% complete and is expected to conclude in early May 2002. the test schedule was affected by relocation of the testing to another test supplier. The target test date for hot fire testing is now not earlier than June 15, 2002