WorldWideScience

Sample records for taitekerroinmittaustekniikan kehittaeminen teollisuuden

  1. TAKE, development of the refractive index measurement technology for industrial needs; TAKE, taitekerroinmittaustekniikan kehittaeminen teollisuuden tarpeisiin - MPKT 12

    Energy Technology Data Exchange (ETDEWEB)

    Raety, J. [Oulu Univ. (Finland)

    1998-12-31

    Refractive index is one of the basic physical phenomena of materials. Traditional refractive index measurement has been widely used e.g. In research, in quality inspection of products and raw materials. It is also used for follow up of the different industrial processes. A measuring and research environment, by which it is possible to determine the complex refractive index of liquid samples, was developed in 1996 at the Measuring Instrument laboratory of the University of Oulu. This equipment, based on the reflectance of light measures both the refractive index and absorption factor of liquids simultaneously. While the commercial refractometers are best suitable for research of clear liquids, by the developed equipment it is possible to investigate by the side of clear fluids also dark strongly light absorbing samples. The measuring wave length can be chosen continuously inside the UV-Visual range. The knowing of the wave-length dependence of the complex refractive index gives additional information on the state of the fluid under inspection. The main objective of the task is to solve measuring problems of biotechnology, food industry and forest industry by a new type of refractometric method. This means the simultaneous measurement of refractive index and absorption, and the utilisation of this knowledge in wide spectral region. A refractometer, based on the technology, suitable for applied research of new measuring targets will be designed and constructed in the research. The above mentioned goals also require the survey of the present situation of the refractometry. This one and a half year project will be started in spring 1998. (orig.)

  2. TAKE, development of the refractive index measurement technology for industrial needs; TAKE, taitekerroinmittaustekniikan kehittaeminen teollisuuden tarpeisiin - MPKT 12

    Energy Technology Data Exchange (ETDEWEB)

    Raety, J [Oulu Univ. (Finland)

    1999-12-31

    Refractive index is one of the basic physical phenomena of materials. Traditional refractive index measurement has been widely used e.g. In research, in quality inspection of products and raw materials. It is also used for follow up of the different industrial processes. A measuring and research environment, by which it is possible to determine the complex refractive index of liquid samples, was developed in 1996 at the Measuring Instrument laboratory of the University of Oulu. This equipment, based on the reflectance of light measures both the refractive index and absorption factor of liquids simultaneously. While the commercial refractometers are best suitable for research of clear liquids, by the developed equipment it is possible to investigate by the side of clear fluids also dark strongly light absorbing samples. The measuring wave length can be chosen continuously inside the UV-Visual range. The knowing of the wave-length dependence of the complex refractive index gives additional information on the state of the fluid under inspection. The main objective of the task is to solve measuring problems of biotechnology, food industry and forest industry by a new type of refractometric method. This means the simultaneous measurement of refractive index and absorption, and the utilisation of this knowledge in wide spectral region. A refractometer, based on the technology, suitable for applied research of new measuring targets will be designed and constructed in the research. The above mentioned goals also require the survey of the present situation of the refractometry. This one and a half year project will be started in spring 1998. (orig.)

  3. Site investigation equipment developed by Teollisuuden Voima Oy

    International Nuclear Information System (INIS)

    Oehberg, A.

    1991-02-01

    Teollisuuden Voima Oy (TVO) carries out site investigations in Finland for final disposal of nuclear high level waste during 1987-2000. In order to carry out the investigations some essential equipment have been designed and constructed. The biggest insufficiency among different measuring methods was among water sampling and hydraulic testing. There are some common specifications which all of these equipment has to fulfil. The two most important are that they have to be operatable in deep slim boreholes down to 1000 meters depth with 56 mm in diameter. The main purpose of the Hydraulic Testing Unit is to determine hydraulic conductivity in crystalline rock, where water can flow primarily through fractures. In most commonly used configurations, measurement range is from 10 - 11 to 10 - 5 m/s with constant-head method. Although constant-head method is principally used, almost any known hydraulic method is possible with existing hardware. Most functions are controlled by the computer. The whole system is built into an electrically heated trailer. The system consists of inflatable packers, stainless steel rods, pressure transducers and datalogging devices. The maximum number of monitoring sections is seven. In addition to that as many blind sections as is needed to prevent vertical flow in boreholes can be installed. Water sampling is possible either with a double packer method or in conjunction with the hydraulic head monitoring equipment. The first possibility involves using the laboratory trailer and the second one using a separate pumping unit plus the laboratory trailer in a later phase when sampling is to be conducted. In the laboratory trailer there are all the measuring devices needed to control different chemical parameters (pH, Eh, pS, O 2 , conductivity and temperature) during pumping

  4. Teollisuuden Voima Oy - Industrial Power Company Ltd. Local information activity

    Energy Technology Data Exchange (ETDEWEB)

    Engros, Taina [Department of Information, TVO, Olkiluoto FIN-27160 (Finland)

    1989-07-01

    There are two nuclear power producers in Finland - the state-owned power company Imatran Voima Oy which operates two 440 MW Soviet-made PWR units in southern Finland, east of Helsinki and the Teollisuuden Voima Oy - Industrial Power Company Ltd, or TVO, owned by Finnish industrial companies. TVO operates two 710 MW ABB ATOM BWR units producing about one fifth of the country's electricity consumption. Operating experiences are extremely good from all Finnish nuclear power plants. The Finns' attitude towards nuclear power has changed into a positive direction in recent times. This can probably be noted as an international trend now that the Chernobyl accident is becoming an incident of the past. The Finnish citizens and politicians are facing two questions; first, what is their attitude towards nuclear power as a source of energy, in other words, do they approve of the plants currently in operation. The second question is how they stand on the building of new plants. It is probably another universal phenomenon that the attitudes of people living in the vicinity of nuclear power plants are less critical than the attitudes of those living farther away. This does not, by any means, result in local information activity being easier or less important than nationwide information activity. On the contrary, local decision-makers, local media and inhabitants are those who can, and through whom we can, influence also wider circles. The Nuclear Energy Act, which became effective in Finland last year, defines that the final decision on whether nuclear power plants can be built inside a municipality, is made at local level. As far as TVO is concerned one factor making local information activity easier is the small size of the locality. The difficulty TVO has to face is the people's suspicion of information activity. All information is considered propaganda, regardless of its form, and only negative news are considered information. Also, a large proportion of people are passive

  5. Teollisuuden Voima Oy - Industrial Power Company Ltd. Local information activity

    International Nuclear Information System (INIS)

    Engros, Taina

    1989-01-01

    There are two nuclear power producers in Finland - the state-owned power company Imatran Voima Oy which operates two 440 MW Soviet-made PWR units in southern Finland, east of Helsinki and the Teollisuuden Voima Oy - Industrial Power Company Ltd, or TVO, owned by Finnish industrial companies. TVO operates two 710 MW ABB ATOM BWR units producing about one fifth of the country's electricity consumption. Operating experiences are extremely good from all Finnish nuclear power plants. The Finns' attitude towards nuclear power has changed into a positive direction in recent times. This can probably be noted as an international trend now that the Chernobyl accident is becoming an incident of the past. The Finnish citizens and politicians are facing two questions; first, what is their attitude towards nuclear power as a source of energy, in other words, do they approve of the plants currently in operation. The second question is how they stand on the building of new plants. It is probably another universal phenomenon that the attitudes of people living in the vicinity of nuclear power plants are less critical than the attitudes of those living farther away. This does not, by any means, result in local information activity being easier or less important than nationwide information activity. On the contrary, local decision-makers, local media and inhabitants are those who can, and through whom we can, influence also wider circles. The Nuclear Energy Act, which became effective in Finland last year, defines that the final decision on whether nuclear power plants can be built inside a municipality, is made at local level. As far as TVO is concerned one factor making local information activity easier is the small size of the locality. The difficulty TVO has to face is the people's suspicion of information activity. All information is considered propaganda, regardless of its form, and only negative news are considered information. Also, a large proportion of people are passive

  6. Sähkösuunnittelu osana suunnitteluprojektia

    OpenAIRE

    Grönroos, Roope

    2016-01-01

    Insinöörityö tehtiin Sweco Industry Oy:n automaatio-osastolle. Työssä tutkittiin, kuinka teollisuuden sähkösuunnittelu liittyy suunnitteluprojekteissa muihin suunnittelualoihin isomman suunnittelukonsernin näkökulmasta. Alussa perehdytään muihin suunnittelualoihin ja siihen, kuinka ne ovat sidoksissa teollisuuden sähkösuunnitteluun. Alussa käydään läpi suunnitteluprojektin eri vaiheita ja mitä niihin sisältyy. Työtä varten haastateltiin eri suunnittelualojen kokeneita ammattil...

  7. 3D-mainosvideo teollisuusyritykselle : Case: Leppäkosken Lämpö

    OpenAIRE

    Utriainen, Sari

    2015-01-01

    Toimeksiantajana opinnäytetyölle toimi biolämmitysjärjestelmiä valmistava ja markkinoiva Ariterm Oy. Tavoitteena oli tuottaa messu- ja markkinointikäyttöön 3D-mainosvideo Ariterm Oy:n toimittamasta, elokuussa 2014 käyttöönotetusta Leppäkosken Lämpö Oy:n pellettilämpölaitoksesta. Opinnäytetyössä käsiteltiin 3D-mallien hyödyntämistä eri teollisuuden aloilla sekä tutustuttiin 3D-mainosvideoprojektissa käytettyihin ohjelmistoihin ja teollisuuden 3D-suunnitteluohjelmien eri tiedostomuotoihin se...

  8. An effort to improve the operators' habits of actions in normal operations and in disturbance situations at TVO NPP in Finland

    International Nuclear Information System (INIS)

    Karlsson, C.

    2004-01-01

    Teollisuuden Voima Oy owns and operates two ABB BWR's, each of 850 MW net outputs. A full-scope training simulator was commissioned in March 1990 at the TVO Olkiluoto plant site. This paper discusses the development of a method to evaluate and improve the operators' habits of actions in a task performance at the Teollisuuden Voima Oy full-scope training simulator. The development of the method started as a study in autumn 1992 and the first goal of the study was to analyse the dynamics of operators' decision making in the on-line control of a disturbance situation. The analysis was ready in 1994. The second goal was to develop out of the analysis method a tool that could serve as the instructor's in evaluating the individuals and the crew's simulator performances. It was assumed that such a tool would enhance the efficiency of the simulator training, because with it the instructors could provide more explicit performance feedback for the operators. The next stage was to apply the method to the entire simulator training and create a course, which consists of a theoretical part and practical training on the simulator. That was done in the retraining period in 1998. The future goals are to improve the method so that it will be used in all the simulator training at the Teollisuuden Voima Oy full-scope training simulator (OLKS). (author)

  9. Bundling harvester; Harvennuspuun automaattisen nippukorjausharvesterin kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Koponen, K [Eko-Log Oy, Kuopio (Finland)

    1997-12-01

    The starting point of the project was to design and construct, by taking the silvicultural point of view into account, a harvesting and processing system especially for energy-wood, containing manually driven bundling harvester, automating of the harvester, and automated loading. The equipment forms an ideal method for entrepreneur`s-line harvesting. The target is to apply the system also for owner`s-line harvesting. The profitability of the system promotes the utilisation of the system in both cases. The objectives of the project were: to construct a test equipment and prototypes for all the project stages, to carry out terrain and strain tests in order to examine the usability and durability, as well as the capacity of the machine, to test the applicability of the Eko-Log system in simultaneous harvesting of energy and pulp woods, and to start the marketing and manufacturing of the products. The basic problems of the construction of the bundling harvester have been solved using terrain-tests. The prototype machine has been shown to be operable. Loading of the bundles to form sufficiently economically transportable loads has been studied, and simultaneously, the branch-biomass has been tried to be utilised without loosing the profitability of transportation. The results have been promising, and will promote the profitable utilisation of wood-energy. (orig.)

  10. Energy management in industrial information systems. Energianhallinta osana teollisuuden informaatiojaerjestelmaeae

    Energy Technology Data Exchange (ETDEWEB)

    Taimisto, O. (Afora Oy, Helsinki (Finland))

    1989-01-01

    The research studies the energy management functions from the point of wiev of an utility or industry which do own generating capacity. Very soon the research was focused on the methods how to generate the data which is required in every day managing. From past experience it became clear that the problems can be solved with linear programming algorithms. During the work mostly well known algoritms were used with some new developement. The past experience of knowing the algorithms to be slow in a real time use were solved by carefully focusing into those part of the problem which were essential at a time. This lead into a separation of problems. Also some new techniques were developed in order to speed up the runtimes. Because a careful understanding of the expressed problems is required throughout the model building session a modelling environment was developed. This gave the advantage of having a person who well knew the process to build and test the model and to check that the solutions are rational. The model designer does not have to concentrate on the database interfacing and algorithms.

  11. Development of stoker-burning technology; Stokeripolton kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Oravainen, H. [VTT Energy, Jyvaeskylae (Finland). Fuels Production; Nojonen, O. [Finntech Oy, Espoo (Finland)

    1995-12-31

    Combustion Technology Research Group of VTT Energy had a project, funded by VTT and Vapo Oy, going on in 1993, the aim of which was to develop a chip/sod peat heating system for power range 50 1 00 kW, meeting the requirements of 1990s, the characteristics being high efficiency (> 85 %), low emissions (CO < 0.1 %), well operability and durability. The project has to be carried out so that the investment and operation costs are as low as possible. Hoegfors Laempoe Oy had simultaneously going on an industrial project, in which new ETNA bioenergy boiler series for the same power range was constructed. A 200 kW stoker burner prototype, suitable for wood chips and sod peat, was developed on the basis of VTT`s research. The boiler has been demonstrated later in power range 500 kW. The present stoker burners are based on downstream combustion principle, which means that the guel and the flue-gases flow into same direction. It is well known that the propagation of the ignition front restricts the power in this kind of combustion while using moist fuels. The heat formed in pyrolysis and carbonizing zone flows away from drying and ignition zone. VTT has an idea, by which it is possible to alter the stoker burner to operate so, that the heat formed in pyrolysis and carbonizing zone flow towards the ignition and drying zone, hence the drying of the moist fuel and ignition of it are intensified remarkably

  12. Development of stoker-burning technology; Stokeripolton kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Oravainen, H [VTT Energy, Jyvaeskylae (Finland). Fuels Production; Nojonen, O [Finntech Oy, Espoo (Finland)

    1996-12-31

    Combustion Technology Research Group of VTT Energy had a project, funded by VTT and Vapo Oy, going on in 1993, the aim of which was to develop a chip/sod peat heating system for power range 50 1 00 kW, meeting the requirements of 1990s, the characteristics being high efficiency (> 85 %), low emissions (CO < 0.1 %), well operability and durability. The project has to be carried out so that the investment and operation costs are as low as possible. Hoegfors Laempoe Oy had simultaneously going on an industrial project, in which new ETNA bioenergy boiler series for the same power range was constructed. A 200 kW stoker burner prototype, suitable for wood chips and sod peat, was developed on the basis of VTT`s research. The boiler has been demonstrated later in power range 500 kW. The present stoker burners are based on downstream combustion principle, which means that the guel and the flue-gases flow into same direction. It is well known that the propagation of the ignition front restricts the power in this kind of combustion while using moist fuels. The heat formed in pyrolysis and carbonizing zone flows away from drying and ignition zone. VTT has an idea, by which it is possible to alter the stoker burner to operate so, that the heat formed in pyrolysis and carbonizing zone flow towards the ignition and drying zone, hence the drying of the moist fuel and ignition of it are intensified remarkably

  13. Development of stoker-burning technology; Stokeripolton kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Oravainen, H [VTT Energy, Jyvaeskylae (Finland); Nojonen, O [Finntech Oy, Espoo (Finland)

    1997-12-01

    The present horizontal stoker burners are based on downstream combustion principle, which means that the fuel and the flue gases flow into same direction. It is known that the propagation of the ignition front restricts the power in this kind of combustion while using moist fuels. The heat formed in pyrolysis and char burn out zones flows away from drying and ignition zones. VTT Energy has an idea, by which it is possible to alter the horizontal stoker burner to operate so, that the heat formed in combustion of fuel flows towards the ignition and drying zones, hence the drying of the moist fuel and ignition of it are intensified remarkably. (orig.)

  14. The geology of the Olkiluoto area

    International Nuclear Information System (INIS)

    Anttila, P.; Paulamaeki, S.; Lindberg, A.; Paananen, M.; Koistinen, T.; Front, K.; Pitkaenen, P.

    1992-12-01

    Teollisuuden Voima Oy (TVO) is preparing for the final disposal of spent nuclear fuel from the Olkiluoto nuclear power plant deep in the Finnish bedrock. An area close to the power plant at Olkiluoto, Eurajoki, was one of the five areas selected in 1987 for the preliminary site investigations. A summary of the geological conditions at the Olkiluoto site is presented in the report

  15. Puunjalostusteollisuuden biotuotannon uudet avaukset

    OpenAIRE

    Puikko, Janne

    2015-01-01

    Opinnäytetyön aiheena olivat biotuotannon uudet avaukset puunjalostusteollisuudessa. Aihe tuli esille vieraillessani Lapin AMKin tutkimus, kehitys ja innovaatio puolella (TKI). Opinnäytetyön tavoitteena oli tehdä kirjallisuusselvitys biotuotannon nykytilanteesta ja eritoten tulevaisuudesta Suomen puunjalostusteollisuudessa. Selvitykseen sisältyy se, minkälaisia uusia puunjalostuksen prosesseja ja tuotteita tulee olemaan puun eri olomuodoilla. Tarkastelussa oli myös teollisuuden sivuvirrat. ...

  16. Työnseurantajärjestelmä

    OpenAIRE

    Mäkelä, Niko

    2011-01-01

    Rutiininomaisten toimintojen automatisointi ja tietojen linkitys tietojärjestelmien avulla parantaa yrityksen tehokkuutta niin toiminnallisesti kuin taloudellisestikin. Projektissa suunniteltiin ja toteutettiin digitaalinen WWW-selainpohjainen tietojärjestelmä forssalaiselle metalliteollisuuden alihankintaan ja teollisuuden kunnossapitoon erikoistuneelle yritykselle. Tietojärjestelmän päällimmäisenä tarkoituksena on helpottaa ja nopeuttaa töiden seurantaan ja tuntityölomakkeiden täyttöön liit...

  17. Means of achieving high load factors at Olkiluoto 1 and 2

    International Nuclear Information System (INIS)

    Patrakka, E.

    2001-01-01

    Teollisuuden Voima Oy operates two BWR units Olkiluoto 1 and 2 that have achieved load factors typically higher than 90%. The operating experiences gained in the 1990s is summarised and the factors contributing to the high capacity factors are addressed. These include the general objectives for operation and maintenance, plant modernisation programme, maintenance principles, and outage policy and experiences. Finally, the international evaluations performed at Olkiluoto are mentioned. (author)

  18. Development of small-scale peat production; Pienturvetuotannon kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Erkkilae, A.; Kallio, E. [VTT Energy, Jyvaeskylae (Finland)

    1997-12-01

    The aim of the project is to develop production conditions, methods and technology of small-scale peat production to such a level that the productivity is improved and competitivity maintained. The aim in 1996 was to survey the present status of small-scale peat production, and research and development needs and to prepare a development plan for small-scale peat production for a continued project in 1997 and for the longer term. A questionnaire was sent to producers by mail, and its results were completed by phone interviews. Response was obtained from 164 producers, i.e. from about 75 - 85 % of small-scale peat producers. The quantity of energy peat produced by these amounted to 3.3 TWh and that of other peat to 265 000 m{sup 3}. The total production of energy peat (large- scale producers Vapo Oy and Turveruukki Oy included) amounted to 25.0 TWh in 1996 in Finland, of which 91 % (22.8 TWh) was milled peat and 9 % (2.2 TWh) of sod peat. The total production of peat other than energy peat amounted to 1.4 million m{sup 3}. The proportion of small-scale peat production was 13 % of energy peat, 11 % of milled peat and 38 % of sod peat. The proportion of small-scale producers was 18 % of other peat production. The results deviate clearly from those obtained in a study of small-scale production in the 1980s. The amount of small-scale production is clearly larger than generally assessed. Small-scale production focuses more on milled peat than on sod peat. The work will be continued in 1997. Based on development needs appeared in the questionnaire, the aim is to reduce environmental impacts and runoff effluents from small- scale production, to increase the efficiency of peat deliveries and to reduce peat production costs by improving the service value of machines by increasing co-operative use. (orig.)

  19. Modernisation of the Olkiluoto nuclear power plant increases the power production efficiency under safe limits

    International Nuclear Information System (INIS)

    Valkeapaeae, R.

    1995-01-01

    Teollisuuden Voima Oy published the efficiency increment plans as a part of the modernisation of the Olkiluoto nuclear power plant. The power of the reactor units, originally designed for 660 MW will now be increased for a second time. The former improvements were made in 1994. The power of the units was increased to 710 MW. After this new renovation the power of the both units will be 830-840 MW. (2 figs.)

  20. PSA - a tool for the nuclear safety

    International Nuclear Information System (INIS)

    Himanen, R.

    1992-01-01

    The PSA-model for BWR-type reactors of Finnish power company, Teollisuuden Voima Oy (TVO) was finished in year 1989. This basic PSA model included all safety systems, normal operating systems and auxiliary systems. Today TVO is working to enlarge the PSA to level 2 (environmental effects, for the fires, for the floodings and the outages). The TVO's experiences has been showed the PSA an useful tool for the developing the safety of BWR's (orig.)

  1. A critical review of published groundwater flow models for safety of nuclear waste disposal

    International Nuclear Information System (INIS)

    Laine, E.

    1997-04-01

    Flow models have been simulated for the potential nuclear waste sites in Precambrian bedrock of Finland in the Technical Research Centre of Finland (VTT). The work had been commissioned by Teollisuuden Voima Oy. In the present study, the published flow models are critically reviewed. The work concentrates on qualitative evaluation of the applied equivalent continuum approach applied to crystalline bedrock. Special attention is paid to the use of the geological information in connection with flow modelling. (35 refs., 6 figs.)

  2. Mayariggauksen Mekanismit : mihin Maya-rigin perustoiminnot pohjautuvat

    OpenAIRE

    Reimi, Roope

    2015-01-01

    Tämä on tutkielma Mayan yleisimpien riggaustyökalujen ja mekanismien toiminnasta ja yleinen katsaus Mayan pohjarakenteeseen. Maya on Autodeskin yleiskäytännöllinen 3D-ohjelmisto, joka on saanut teollisuuden aloilla maineen luotettavana, mutta haastavana animaatioalustana. Tässä tutkielmassa aion selvittää muutamia konsepteja, jotka saattavat hämmentää Mayassa ja avata sen logiikkaa toimintojensa takana. Aion myös pureutua syvemmin muutamien Mayan perus riggaustyökalujen toimintaan ja millaine...

  3. Development of wood fuel delivery logistics; Puupolttoaineiden hankintalogistiikan kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Laitinen, H

    1997-12-31

    The main aim of the project is to model the energy wood business and total logistics in a certain large region. First, wood utilisation locations inside this area are examined; the most important ones are the wood processing factories, and the heating- and power plants. After that, wood potentials in the forests of the area are evaluated in sub-areas suitable in size and sufficiently detailed for further evaluations. For that purpose, the most valuable source data are forest management plans, up to ten years forward, on which basis the wood fuel potentials can be evaluated following sustainable development. In Finland there are extensive and detailed data bases storing forest information and it is possible to collect necessary data for a data base applicable to our calculations. In logistical sense it is important to know, by which delivery chains the economically best and desired results are achieved. The software prototype based on data base is modelled and developed at VTT Energy, for facilitating these planning activities. The starting point of the planning system in delivery logistics is the implementation of an easy tool for versatile planning so that with this tool model different delivery chains can be flexiblyed, create usage scenarios, make alternative examinations, and calculate impacts of different factors on energy wood amounts yielded and delivery costs. With planning system in delivery logistics we calculate production costs and amounts delivered to different utilisation locations. The system offers tools for definitions of utilisation locations, calculation parameters, and delivery chains

  4. Development of wood fuel delivery logistics; Puupolttoaineiden hankintalogistiikan kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Laitinen, H.

    1996-12-31

    The main aim of the project is to model the energy wood business and total logistics in a certain large region. First, wood utilisation locations inside this area are examined; the most important ones are the wood processing factories, and the heating- and power plants. After that, wood potentials in the forests of the area are evaluated in sub-areas suitable in size and sufficiently detailed for further evaluations. For that purpose, the most valuable source data are forest management plans, up to ten years forward, on which basis the wood fuel potentials can be evaluated following sustainable development. In Finland there are extensive and detailed data bases storing forest information and it is possible to collect necessary data for a data base applicable to our calculations. In logistical sense it is important to know, by which delivery chains the economically best and desired results are achieved. The software prototype based on data base is modelled and developed at VTT Energy, for facilitating these planning activities. The starting point of the planning system in delivery logistics is the implementation of an easy tool for versatile planning so that with this tool model different delivery chains can be flexiblyed, create usage scenarios, make alternative examinations, and calculate impacts of different factors on energy wood amounts yielded and delivery costs. With planning system in delivery logistics we calculate production costs and amounts delivered to different utilisation locations. The system offers tools for definitions of utilisation locations, calculation parameters, and delivery chains

  5. Meteorological data and update of climate statistics of Olkiluoto 2005 - 2006

    International Nuclear Information System (INIS)

    Ikonen, A.T.K.

    2007-10-01

    In this working report the data of some routine field observations of Posiva Oy and automatic measurements of the Olkiluoto nuclear power plant weather station owned and operated by Teollisuuden Voima Oy is published for further reference. The data reported here covers observations in 2005-2006. First, a concise description of data acquisition methods and handling is provided. Thereafter the actual data is presented in the appendices. Weather measurements (e.g. temperature, wind speed and direction, humidity) and snow and ground frost observations are reported. (orig.)

  6. Prosessipuhdistusmenetelmät laivoilla

    OpenAIRE

    Karvali, Ville

    2017-01-01

    Prosessipuhdistusta käytetään laajasti teollisuuden tarpeisiin, mutta laivoilla sen käyt-tö rajoittuu laivan rakentamisen ja telakoinnin yhteyteen. Suuri tekijä tähän on tiedon puute erilaisista puhdistusmahdollisuuksista. Työssä selvitetään erilaisten työtapojen käyttömahdollisuuksia laivalla myös satamassa ja merellä ollessa. Tiedon lisääntyessä erilaisten puhdistusmahdollisuuksien käyttö helpottuu. Lähdemateriaalina prosessipuhdistusmenetelmille on käytetty toimeksiantajalta tullut-ta ...

  7. Meteorological data at Olkiluoto in period of 2002-2004

    International Nuclear Information System (INIS)

    Ikonen, A.T.

    2005-07-01

    In this working report the data of some routine field observations of Posiva Oy and automatic measurements of the Olkiluoto nuclear power plant weather station owned and operated by Teollisuuden Voima Oy is published for further reference. The data reported here covers observations from 2002 to 2004. First, a concise description of data acquisition methods and handling is provided. Thereafter the actual data is presented in the appendices. Weather measurements (e.g. temperature, wind speed and direction, humidity) and snow, ground frost and ditch flow rate observations are reported. (orig.)

  8. KTG seminar: nuclear power plants for the 21. century

    International Nuclear Information System (INIS)

    Buescher, T.; Fischer, C.

    2004-01-01

    Just a year ago, in December 2003, the Finnish electricity utility Teollisuuden Voima Oy (TVO) has signed a contract with AREVA, represented through Framatome ANP, and Siemens to build an EPR (European Pressurized Water Reactor) at the Olkiluoto site in Finland. The project is currently realized. According to this one of the two annual meetings in 2004 for the YOUNG GENERATION dealt with this topic. The EPR as well as the challenges for the future electricity production have been discussed during this well established meeting in Erlangen with experts from the Industry. (orig.)

  9. Local opinion - the impact of visitor centre two studies at Olkiluoto

    International Nuclear Information System (INIS)

    Aemmaelae, V.M.

    1993-01-01

    Teollisuuden Voima Oy (TVO) has recently commissioned two opinion polls about attitudes towards nuclear power. The target group of the first research was teachers in the nearby community. The subject of the poll was attitudes towards nuclear power and the impact of a visit. The second research handles the company image of TVO target groups being local elected officials, press, teachers and local representatives of trade organizations. The aim of these two studies was to measure the impact of the company's information and visits activities to the attitudes. (author)

  10. Development of wood-fueled fireplace systems; Puuta kaeyttaevien tulisijajaerjestelmien kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Oravainen, H.

    1995-12-31

    The objective of the project was to reduce the emissions of fireplaces by developing and using catalysts to promote the oxidation of incompletely combusted gases of the flue-gases. The project started in 1993. The research in 1995 was concentrated on investigation of the combustion phenomena in a heat-accumulating fireplace. Measurements, by which it has been tried to clarify the fundamental factors of clean combustion in batch-combustion, such as the temperature, the mixing of the combustion air, and the retention time, have been made using accumulating fireplaces. Series of tests have been made using different ways of feeding the secondary air

  11. Development of wood-fueled fireplace systems; Puuta kaeyttaevien tulisijajaerjestelmien kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Oravainen, H

    1996-12-31

    The objective of the project was to reduce the emissions of fireplaces by developing and using catalysts to promote the oxidation of incompletely combusted gases of the flue-gases. The project started in 1993. The research in 1995 was concentrated on investigation of the combustion phenomena in a heat-accumulating fireplace. Measurements, by which it has been tried to clarify the fundamental factors of clean combustion in batch-combustion, such as the temperature, the mixing of the combustion air, and the retention time, have been made using accumulating fireplaces. Series of tests have been made using different ways of feeding the secondary air

  12. Development of an underdrained peat production field; Salaojitetun tuotantokentaen kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Hillebrand, K.

    1996-12-31

    The objective of the study is to examine the possibilities to improve the drainage of a peat production field using a numerical groundwater model. The effects of the ditch spacing and the drainage method on the groundwater level are studied. The way of ditching for basic drainage of virgin peatland, and the calculation of possible additional ditching in peat production fields, including the shallow areas, are considered. Also, the possibility of increasing the customary ditch spacing of 20 m is examined. The objective for drainage techniques is to cut the time for peatland preparation in half, and to increase the space between open field ditches from the present 20 meters to 60 - 80 meters by making use of underdrains. In this way it is possible to reduce the peat production costs about 5%. In 1995 the numerical groundwater model has been validated at Pajusuo drainage area. According to the comparison of the groundwater level calculated with the model and measured at Pajusuo, the agreement was very satisfactory. Uncertainty in the calculations derived mainly from the difficulties of assessing the pF curve and the hydraulic conductivity of the soil, as well as the water-carrying capacity of the mole drains. In general one can predict the groundwater level with an accuracy of +- 10 cm. Also the possibility to increase the hydraulic conductivity of peat by a chemical additive was studied. Adding 3 kg chemical per 1 kg dry matter it was possible to increase the hydraulic conductivity over twenty fold. In this way it is possible to construct vertical underdrains to improve the infiltration after rainfall

  13. Nuclear waste management programme 2003 for the Loviisa and Olkiluoto nuclear power plants

    International Nuclear Information System (INIS)

    2002-09-01

    A joint company Posiva Oy founded by nuclear energy producing Teollisuuden Voima Oy (TVO) and Fortum Power and Heat Oy coordinates the research work of the companies on nuclear waste management in Finland. In Posiva's Nuclear Waste Management Programme 2003, an account of the nuclear waste management measures of TVO and Fortum is given as required by the sections 74 and 75 of the Finnish Nuclear Energy Degree. At first, nuclear waste management situation and the programme of activities are reported. The nuclear waste management research for the year 2003 and more generally for the years 2003-2007 is presented

  14. 5S-MENETELMÄN KÄYTTÖÖNOTTO SERVICEPOINTILLA

    OpenAIRE

    Ovaskainen, Tatu-Pekka

    2014-01-01

    Opinnäytetyö on tehty Servicepoint Kuopio Oy:n toimeksiannosta. Servicepoint Kuopio on teollisuuden kunnossapitoon automaatio- ja sähköistysprojekteihin sekä robottisovelluksiin erikoistunut yritys. Yrityksen kahden toimipisteen yhdistyminen lisäsi toimipisteellä henkilöstön ja työkalujen määrää. Yrityksessä toteutetaan sovelletusti Lean-ajattelumallia. Yksi Leanin työkaluista on 5S, joka haluttiin ottaa käyttöön yrityksessä. Opinnäytetyön tavoitteena oli ottaa käyttöön 5S-menetelmä Servi...

  15. Environmental Impact Assessment for Olkiluoto 4 Nuclear Power Plant Unit in Finland

    International Nuclear Information System (INIS)

    Dersten, Riitta; Gahmberg, Sini; Takala, Jenni

    2008-01-01

    In order to improve its readiness for constructing additional production capacity, Teollisuuden Voima Oyj (TVO) initiated in spring 2007 the environmental impact assessment procedure (EIA procedure) concerning a new nuclear power plant unit that would possibly be located at Olkiluoto. When assessing the environmental impacts of the Olkiluoto nuclear power plant extension project, the present state of the environment was first examined, and after that, the changes caused by the projects as well as their significance were assessed, taking into account the combined impacts of the operations at Olkiluoto. The environmental impact assessment for the planned nuclear power plant unit covers the entire life cycle of the plant unit. (authors)

  16. Assessing the velocity of the groundwater flow in bedrock fractures

    International Nuclear Information System (INIS)

    Taivassalo, V.; Poteri, A.

    1994-10-01

    Teollisuuden Voima Oy (TVO) is studying the crystalline bedrock in Finland for the final disposal of the spent nuclear fuel from its two reactors in Olkiluoto. Preliminary site investigations for five areas were carried out during 1987-1992. One part of the investigation programme was three-dimensional groundwater flow modelling. The numerical site-specific flow simulations were based on the concept of an equivalent porous continuum. The results include hydraulic head distributions, average groundwater flow rate routes. In this study, a novel approach was developed to evaluate the velocities of the water particles flowing in the fractured bedrock. (17 refs., 15 figs., 5 tabs.)

  17. Parliament's decision specified the energy policy in Finland

    International Nuclear Information System (INIS)

    Aurela, J.

    2002-01-01

    The Finnish Parliament decided on Friday 24 May 2002, to ratify the favourable decision-in-principle on the fifth nuclear power plant unit made by the Government last January, with 107 votes in favour and 92 votes against. Thus Teollisuuden Voima Oy (TVO), the Finnish privately owned electricity generation company responsible for the project, is authorised to continue the preparations for the construction of a new nuclear power plant unit. The article handles the process in the coming years if TVO will go on with the process. The most important steps according to the nuclear legislation are to have construction and operating licenses in due time. (author)

  18. Bedrock model of the Veitsivaara area

    International Nuclear Information System (INIS)

    Saksa, P.; Kuivamaeki, A.; Kurimo, M.; Anttila, P.; Front, K.; Pitkaenen, P.; Korkealaakso, J.; Vaittinen, T.

    1993-07-01

    Site investigations were carried out at Veitsivaara, in 1987-1991 in accordance with an investigation programme for radioactive waste disposal drawn up by Teollisuuden Voima Oy (TVO). The site was modelled in terms of rock types, fracturing, fracture structures and geophysical conditions, the main focus of examination was on fracturing and associated hydraulic conductivity. The various properties of the bedrock structures were classified by means a three-dimensional model. The descriptions of the models were stored in a computer system for illustration purposes. The rock types at Veitsivaara are tonalite gneiss, Tuliniemet potassium granite, amphipolite, granite porphyry and metadiabase, the last two of which occur in dykes

  19. Environmental Impact Assessment for Olkiluoto 4 Nuclear Power Plant Unit in Finland

    Energy Technology Data Exchange (ETDEWEB)

    Dersten, Riitta; Gahmberg, Sini; Takala, Jenni [Teollisuuden Voima Oyj, Olkiluoto, FI-27160 Eurajoki (Finland)

    2008-07-01

    In order to improve its readiness for constructing additional production capacity, Teollisuuden Voima Oyj (TVO) initiated in spring 2007 the environmental impact assessment procedure (EIA procedure) concerning a new nuclear power plant unit that would possibly be located at Olkiluoto. When assessing the environmental impacts of the Olkiluoto nuclear power plant extension project, the present state of the environment was first examined, and after that, the changes caused by the projects as well as their significance were assessed, taking into account the combined impacts of the operations at Olkiluoto. The environmental impact assessment for the planned nuclear power plant unit covers the entire life cycle of the plant unit. (authors)

  20. Environmental impact assessments of a fifth nuclear power plant unit in Finland

    International Nuclear Information System (INIS)

    Aurela, Jorma; Koivisto, Katarina

    2000-01-01

    This paper presents the results of president questionnaires and media monitoring of press cuttings concerned with siting of the new fifth in a row Finnish NPP. Two years ago both Fortum Power and Heat Oy and Teollisuuden Voima Oy (TVO) launched their Environmental impact assessment (EIA) procedures of a new nuclear power unit in Finland. The EIA procedures were launched to investigate the environmental impacts of a fifth nuclear power plant which possibly will be built in Loviisa or at Olkiluoto. In Finland there are four operating NPP units, two in Loviisa (Fortum) and two in Eurajoki, Olkiluoto (TVO). In the EIA procedure citizens and various associations and authorities have an opportunity to express their views on the matters related to the project. The Ministry of Trade and Industry (MTI) as the coordination authority arranges the organisation of the EIA hearings and the collection of statements and opinions. The EIA procedure in Finland takes place in two stages. The first stage i.e. the EIA programme describes the project and presents the plan on how the environmental effects are investigated and assessed. In the second stage the actual assessment of the environmental effects of the project will be submitted. Both Fortum and Teollisuuden Voima Oy (TVO) launched in spring 1998 their EIA procedures. The main alternatives are the Loviisa 3 project includes two plant type alternatives. The size of the plant is between 1000 and 1700 MWe, and the extension project of the Olkiluoto NPP to build a NPP unit of about 1000-1500 MWe at Olkiluoto. The EIA reports were submitted to the MTI in August 1999 and after that they were on display for two months for opinions and statements

  1. Bedrock model of the Olkiluoto area

    International Nuclear Information System (INIS)

    Saksa, P.; Paananen, M.; Paulamaeki, S.; Anttila, P.; Front, K.; Pitkaenen, P.; Hassinen, P.; Ylinen, A.

    1993-07-01

    Site investigations were carried out at Olkiluoto (in Finland) in 1987-1992 in accordance with an investigation programme drawn up by Teollisuuden Voima Oy (TVO). The site was modelled in terms of rock types, fracturing, fracture structures and geohydrological conditions, the main focus of examination was on fracturing and associated hydraulic conductivity. The various properties of the bedrock structures were classified by means of a three-dimensional model. The descriptions of the models were gathered in a computer system for illustration and storage purposes. The rock types at Olkiluoto are migmatite, which may be divided into mica gneiss and veined gneiss, and also tonalite and coarse-grained migmatite granite (pegmatite). (64 refs., 65 figs.)

  2. Operation set for 2018 as regulator considers olkiluoto-3 licence application

    Energy Technology Data Exchange (ETDEWEB)

    Kraev, Kamen [NucNet, Brussels (Belgium)

    2017-02-15

    Finland has announced progress with its delayed nuclear project and has confirmed it will not be affected by anomalies discovered in some components manufactured for EPRs in France. The Olkiluoto-3 European Pressurised Reactor (EPR) nuclear plant under construction in Finland is on schedule to begin commercial operation in 2018 with the country's regulator preparing a safety assessment that will pave the way for fuel loading. Jouni Silvennoinen, senior vice-president for Olkiluoto-3 at Teollisuuden Voima Oyj (TVO), told NucNet that fuel loading at the EPR plant, which is nine years behind schedule, is expected in the spring of 2018. He said construction and licensing of the plant are progressing.

  3. Artificial intelligence in nuclear power plants. Vol. 2

    International Nuclear Information System (INIS)

    Haapanen, P.J.

    1990-01-01

    The IAEA Specialists' Meeting on Artificial Intelligence in Nuclear Power Plants was arranged in Helsinki/Vantaa, Finland, on October 10-12, 1989, under auspices of the International Working Group of Nuclear Power Plant Control and Instrumentation of the International Atomic Energy Agency (IAEA/IWG NPPCI). Technical Research Centre of Finland together with Imatran Voima Oy and Teollisuuden Voima Oy answered for the practical arrangements of the meeting. 105 participants from 17 countries and 2 international organizations took part in the meeting and 58 papers were submitted for presentation. These papers gave a comprehensive picture of the recent status and further trends in applying the rapidly developing techniques of and safety in designing and using of nuclear power worldwide

  4. Presentation of TVO's visitor's centre

    International Nuclear Information System (INIS)

    Aemmaelae, V.M.

    1993-01-01

    There are four nuclear power plant units in Finland, two of which are PWR's owned by Imatran Voima Oy. The two BWR units are located at Olkiluoto and owned by Teollisuuden Voima Oy. This presentation tells about TVO's concept of informing the visitors at Olkiluoto. At the site there are located, in addition to the two nuclear power plant units, the intermediate storage for spent fuel, the repository for low and medium-active waste as well as the training centre. At the Olkiluoto Visitor's Centre all the activities of the company are presented using varied audio-visual aids. The centre has several exhibits and there are also different installations to show how the plant works. (author)

  5. The EPR. A safe and competitive solution for future energy needs

    International Nuclear Information System (INIS)

    Leverenz, R.

    2006-01-01

    In 2002, the Finnish Government gave the go-ahead for construction of the country's fifth nuclear power plant unit. In December of 2003, the AREVA NP/Siemens Consortium was awarded a turnkey contract by the Finnish utility Teollisuuden Voima Oy (TVO) to build a new nuclear power plant at the Olkiluoto site where two boiling water reactor units are already in operation. Olkiluoto 3 is an EPR, and thus the world's very first third generation nuclear power plant under construction. The reactor is being supplied by AREVA NP, the turbine and generator by Siemens. AREVA NP, which is head of the consortium, is responsible for overall project management as well as technical and functional integration. (author)

  6. Cost effectiveness of DH-network construction. Final report; Kaukolaempoeverkon rakentamisen kehittaeminen; Loppuraportti

    Energy Technology Data Exchange (ETDEWEB)

    Kivistoe, V.M. [Ekono Energy Ltd, Espoo (Finland)

    1993-12-31

    Construction cost of DH networks were analyzed in the study. Basing on the analysis, those areas of construction activities were selected, where cost effectiveness could be improved. According to the study, the civil works` cost form about half of the total construction cost on small diameter networks and 30..40 % of the cost of larger sizes. The impact of the design on the construction cost should be emphasized. According to the study it is possible to find significant reduction in the construction cost by increased use of twin pipe where the both carrier pipes are included in the same insulation casing. In small network sizes the reduction of cost achievable by the above is about 30..35 % and in larger sizes about 10 % (DN 125..DN 200) when comparing with a design by individual pipes. The use of twin pipe also causes savings in thermal loss. In sizes DN 65 and up, the saving in heat loss is about 90..95 FIM/m which represents about half of the total savings when compared with design by individual pipes. The possibility of prestressing the twin pipe element at factory in order to shorten the installation time at site was also studied and test pipes was also done. By factory prestressing it would be possible to avoid preheating of pipes at construction site. The trench could be backfilled immediately after pipe laying, welding and inspections. Theoretically and based on test pipes done the prestressing of twin pipe element looks very promising. When factory prestressing would be used, the open time of the trench is reduced significantly and for instance the disturbance to traffic is smaller. As well the use of labour and machinery at site could be more effective

  7. Development of a feeding device for solid material; Kiinteaen materiaalin syoettoelaitteen kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Heinonen, O.; Tiihonen, J. [Imatran Voima Oy, Vantaa (Finland). R and D Section

    1995-12-31

    Feeding of solid fuel into high pressure is an essential part of the pressurized power plant processes. A pilot scale fuel feeder meeting the requirements of these processes has been designed and built by Imatran Voima Oy (IVO). The fuel feeder is capable of feeding both relatively dry and wet solid material into high pressure. The object of this project was to develop the pilot scale fuel feeder to commercial level. The project was financed by IVO and Bioenergia -research programme. The project included testing of the previously built pilot-feeder at real operating conditions using peat and wood biomass as feedstocks. The testing consisted of short term and long term runs, which provided information about the operation and durability of the feeder with different materials. The tests were carried out partly in IVO`s laboratory, and partly in Jyvaeskylae at the pressurized steam drying pilot plant owned by IVO and VTT. The pilot-feeder operated well and reliably during the feeding tests. The feeder was dissembled and the parts were inspected between and after the test periods. No sign of excessive wear of the parts was noticed. Based on the good experiences from the pilot scale testing a commercial feeder with the capacity of 50 m{sup 3}/h was designed

  8. Development of a feeding device for solid material; Kiinteaen materiaalin syoettoelaitteen kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Heinonen, O.; Tiihonen, J [Imatran Voima Oy, Vantaa (Finland). R and D Section

    1996-12-31

    Feeding of solid fuel into high pressure is an essential part of the pressurized power plant processes. A pilot scale fuel feeder meeting the requirements of these processes has been designed and built by Imatran Voima Oy (IVO). The fuel feeder is capable of feeding both relatively dry and wet solid material into high pressure. The object of this project was to develop the pilot scale fuel feeder to commercial level. The project was financed by IVO and Bioenergia -research programme. The project included testing of the previously built pilot-feeder at real operating conditions using peat and wood biomass as feedstocks. The testing consisted of short term and long term runs, which provided information about the operation and durability of the feeder with different materials. The tests were carried out partly in IVO`s laboratory, and partly in Jyvaeskylae at the pressurized steam drying pilot plant owned by IVO and VTT. The pilot-feeder operated well and reliably during the feeding tests. The feeder was dissembled and the parts were inspected between and after the test periods. No sign of excessive wear of the parts was noticed. Based on the good experiences from the pilot scale testing a commercial feeder with the capacity of 50 m{sup 3}/h was designed

  9. Development of fluidized bed combustion of biomass; Leijupolttoprosessin kehittaeminen vaikeille biopolttoaineille soveltuvaksi

    Energy Technology Data Exchange (ETDEWEB)

    Hiltunen, M; Vaehaenen-Koivuluoma, T [Foster Wheeler Energia Oy, Karhula (Finland)

    1997-10-01

    Some commercial BFB boilers burning biofuels, or biofuels and industrial wood wastes have suffered serious problems in bed material sintering. In worst cases the cumulation of reactive alkali compounds has caused total sintering of bed material even during a few days` operation. This presentation reports the results obtained from three separate cases, where sintering problems occurred. Boiler A burned biofuel with quartz sand and limestone addition. Boiler B burned softwood bark and industrial wood waste with sand addition. Boiler C burned softwood bark and sludge with sand addition. Due to the fuel used, bed sintering occurred in all boilers. Obviously, sintering was also influenced by some technical problems. Bed material samples have been analyzed with XRF and SEM-EDS techniques. According to these analyses, the main reason for sintering in boiler A is the cumulation of reactive potassium in bed material. In boiler B, the main reason is the fuel change from a mixture of softwood bark and industrial wood waste to pure industrial wood waste. The extra load of reactive sodium exceeded the critical concentration of alkali compounds in bed material. Also in boiler C, the fuel change from a mixture of softwood bark and sludge to pure softwood bark seems to be one of the reasons for bed sintering. After the fuel change the bed saturated with reactive potassium and the bed sintered. (orig.)

  10. Integrated production of merchantable wood and wood fuels in industry; Teollisuuden ainespuun ja puupolttoaineen integroitu tuotanto

    Energy Technology Data Exchange (ETDEWEB)

    Kuvaja, K [Enso Oy, Imatra (Finland). Forest Dept.

    1997-12-01

    The aim of this project is the economically profitable integrated harvesting of industrial wood and firewood especially in harvesting of small-diameter first thinning wood. The research in 1994 was concentrated on improvement of the quality of the chipping methods based on chain-flail debarking chipping method, and on determination of the possible utilisation targets for the fuel fraction. A reasonably large drum debarking test was also carried out at the industrial scale debarking station of the Enocell Oy. More than 80 000 m{sup 3} of first thinning wood was delivered by Enocell during this project. The quality of wood chips, produced using the chain-flail delimbing method, could be improved in the case of pine nearly to the required quality level, but additional measures are still needed in the case of birch. The fuel fraction deliveries to different points of utilisation was started. The particle size of the fuel fraction appeared to be good after crushing. In 1995 a chain-flail-drum debarking chipping unit was developed to improve and homogenise the quality of chips. (orig.)

  11. The Geology of the Kivetty area

    International Nuclear Information System (INIS)

    Anttila, P.; Paulamaeki, S.; Lindberg, A.; Paananen, M.; Koistinen, T.; Front, K.; Pitkaenen, P.

    1992-05-01

    Teollisuuden Voima Oy (TVO) is preparing for the final disposal of spent nuclear fuel from the Olkiluoto nuclear power plant (TVO-I and TVO-II) deep in the Finnish bedrock. Kivetty in Konginkangas was one of the five areas selected in 1987 for preliminary site investigations for this purpose. The Kivetty area in Central Finland is located in a Svecokarelian granitoid environment consisting of a complex of synorogenic granitoids 1900 - 1860 million years in age. The bedrock consists almost entirely of plutonic rocks, i.e. gabbro, porphyritic granodiorite and granite, eguigranular granodiorite and granite, listed in order of age. The majority of the rock types are porphyritic in character, and supracrustal rocks such as quartz-feldspar schist and gneiss are found occasionally in small xenoliths

  12. The international INTRAVAL project. Summary and conclusions by the TVO/VTT Team

    International Nuclear Information System (INIS)

    Hautojaervi, A.

    1994-12-01

    Teollisuuden Voima Oy (TVO) participated the international cooperation project INTRAVAL and VTT Energy acted as a project team. The Finnish participation focused on flow and transport in crystalline fractured rock and six test cases out of thirteen were tackled. The experimental results were evaluated mainly by means of analytical transport models. The report presents a short review of the experience obtained in the course of the project. It concentrates on the issues revealed in the discussions and analyses of the six test cases in which the TVO/VTT team actively participated but some of the conclusions are even more general in nature. Some suggestions are made for future experimental and theoretical work in the field of geosphere. (15 refs., 2 tabs.)

  13. Suitability of Haestholmen Loviisa for final disposal of spent fuel. Preliminary study; Loviisan Haestholmenin soveltuvuus kaeytetyn polttoaineen loppusijoitukseen. Esiselvitys

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    Based on the amendment of the Nuclear Energy Act the spent nuclear fuel of Imatran Voima Oy (IVO) will be disposed of in Finland instead of returning it to Russia. After Teollisuuden Voima Oy (TVO) and IVO had founded a joint company Posiva Oy the work IVO started in 1995 was brought together with the ongoing research programme for final disposal of spent fuel and extended to a feasibility study. The feasibility study was launched in the beginning of 1996. The geological evaluation was mainly based on the previous investigations at the island. For this study the complementary geological mapping has been carried out at the Haestholmen and on the surrounding area with a radius of 20 km. (49 refs.).

  14. Artificial intelligence in nuclear power plants

    International Nuclear Information System (INIS)

    Haapanen, P.J.

    1990-01-01

    The IAEA Specialists' Meeting on Artificial Intelligence in Nuclear Power Plants was arranged in Helsink/Vantaa, Finland, on October 10-12, 1989, under auspices of the International Working Group of Nuclear Power Plant Control and Instrumentation of the International Atomic Energy Agency (IAEA/IWG NPPCI). Technical Research Centre of Finland together with Imatran Voima Oy and Teollisuuden Voima Oy answered for the practical arrangements of the meeting. 105 participants from 17 countries and 2 international organizations took part in the meeting and 58 papers were submitted for presentation. These papers gave a comprehensive picture of the recent status and further trends in applying the rapidly developing techniques of artificial intelligence and expert systems to improve the quality and safety in designing and using of nuclear power worldwide

  15. Design principle of TVO's final repository and preliminary adaptation to site specific conditions

    International Nuclear Information System (INIS)

    Salo, J-P.; Reikkola, R.

    1995-01-01

    Teollisuuden Voima Oy (TVO) is responsible for the management of spent fuel produced by the Olkiluoto power plant. TVO's current programme of spent fuel management is based on the guidelines and time schedule set by the Finnish Government. TVO has studied a final disposal concept in which the spent fuel bundles are encapsulated in copper canisters and emplaced in Finnish bedrock. According to the plan the final repository for spent fuel will be in operation by 2020. TVO's updated technical plans for the disposal of spent fuel together with a performance analysis (TVO-92) were submitted to the authorities in 1992. The paper describes the design principle of TVO's final repository and preliminary adaptation of the repository to site specific conditions. (author). 10 refs., 5 figs

  16. Bionergy expertise project in Southern Ostrobothnia; Bioenergia-asiantuntijuutta kehittaemaessae Etelae-Pohjanmaalla

    Energy Technology Data Exchange (ETDEWEB)

    Sivula, A.; Lauhanen, R.; Saarela, A.; Ahtola, T.; Pasila, A.

    2013-06-01

    The EU has set the goal for the use of renewable energy at 20 percent by the year 2020. The Finnish national goal is 38 percent. This goal has set new challenges for entrepreneurs who are working in the field of bioenergy. Bioenergy is developing all the time and because of this new information should be passed on to persons who are working in the field of bioenergy continuously. Seinajoki University of Applied Sciences (School of Forestry and Agriculture) implemented the bioenergy expertise project (Bioenergia-asiantuntijuuden kehittaeminen tyoeelaemaelaehtoeisesti) during the years 2009 - 2012 in Southern Ostrobothnia of Finland. The bioenergy expertise project developed the Learning Environment in the field of bioenergy, formed a bioenergy professionals' network, activated the bioenergy entrepreneur network, implemented the report on the future needs of bioenergy education, tested and piloted a reference model for information collection using mobile systems with the bioenergy actors, and arranged bioenergy themed events. The Learning Environment can be used to meet the needs of the University of Applied Sciences and by the entrepreneurs in the area. The bioenergy professionals' network is a group of professionals who work in the area of Southern Ostrobothnia. Bioenergy themed events attracted a lot of participants, but the most popular events were the bioenergy fairs, which were arranged in Tuomarniemi and Kurejoki. The arranged events were also useful from the entrepreneurs networking point of view. The bioenergy expertise project was overall a success and the feedback was positive. The permanent results of the project are publications, reports, the bioenergy professionals' network and the new Learning Environment. Seinajoki University of Applied Sciences is hosting the Learning Environment. The bioenergy professionals' network is continuing its activities in Jarvikilta network of professionals, which also have activities in the area of

  17. Bedrock model of the Kivetty area

    International Nuclear Information System (INIS)

    Saksa, P.; Paulamaeki, S.; Paananen, M.; Anttila, P.; Front, K.; Pitkaenen, P.; Korkealaakso, J.; Okko, O.

    1993-07-01

    Preliminary site investigations were carried out at Kivetty (in Finland), in 1987-1992 in accordance with the investigation programme drawn up by Teollisuuden Voima Oy (TVO). The site was modelled in terms of rock type, fracturing, fracture structures and geohydrological conditions, with the main emphasis being placed on fracturing and associated hydraulic conductivity. The various properties of the bedrock structures were classified in relation to a three-dimensional model. The descriptions of the models were stored in a computer system for the purpose of illustration. The principal rock types encountered at the Kivetty site are porphyritic granodiorite and porphyritic granite, in addition to which even-grained granite and granodiorite, gabbro, and small felsic and mafic veins occur. The rocks have undergone two distinct phases of deformation. (41 refs., 50 figs.)

  18. Geophysical borehole logging. Final disposal of spent fuel

    International Nuclear Information System (INIS)

    Rouhiainen, P.

    1984-01-01

    Teollisuuden Voima Oy (Industrial Power Company Ltd.) will take precautions for final disposal of spent fuel in the Finnish bedrock. The first stage of the site selection studies includes drilling of a deep borehole down to approximately 1000 meters in the year 1984. The report deals with geophysical borehole logging methods, which could be used for the studies. The aim of geophysical borehole logging methods is to descripe specially hydrogeological and structural features. Only the most essential methods are dealt with in this report. Attention is paid to the information produced with the methods, derscription of the methods, interpretation and limitations. The feasibility and possibilities for the aims are evaluated. The evaluations are based mainly on the results from Sweden, England, Canada and USA as well as experiencies gained in Finland

  19. Diffusion of water, cesium and neptunium in pores of rocks

    International Nuclear Information System (INIS)

    Puukko, E.; Heikkinen, T.; Hakanen, M.

    1993-10-01

    Teollisuuden Voima Oy (TVO) is investigating the feasibility to dispose of spent nuclear fuel within Finland. The present plan calls for the repository to be located in crystalline rock at a depth of several hundred meters. The safety assessment of the repository includes calculations of migration of waste nuclides. The flow of waste elements in groundwater will be retarded through sorption interaction with minerals and through diffusion into rock. Diffusion is the only mechanism retarding the migration of non-sorbing species and, it is expected to be the dominating retardation mechanism of many of the sorbing elements. In the investigation the simultaneous diffusion of tritiated water (HTO), cesium and neptunium in rocks of TVO investigation sites at Kivetty, Olkiluoto and Romuvaara were studied. (11 refs., 33 figs., 9 tabs.)

  20. Integrated production of merchantable wood and wood fuels in industry; Teollisuuden ainespuun ja puupoltto-aineen integroitu tuotanto

    Energy Technology Data Exchange (ETDEWEB)

    Kuvaja, K [Enso-Gutzeit Oy, Imatra (Finland). Forest Dept.

    1997-12-31

    The aim of this project is the economically profitable integrated harvesting of industrial wood and firewood especially in harvesting of small-diameter first thinning wood. The research in 1994 was concentrated on improvement of the quality of the chipping methods based on chain-flail debarking chipping method, and on determination of the possible utilization targets for the fuel fraction. A reasonably large drum debarking test was also carried out at the industrial scale debarking station of the Enocell Oy. More than 80 000 m{sup 3} of first thinning wood was delivered by Enocell during this project. The quality of wood chips, produced using the chain-flail delimbing method, could be improved in the case of pine nearly to the required quality level, but additional measures are still needed in the case of birch. The fuel fraction deliveries to different points of utilization was started. The particle size of the fuel fraction appeared to be good after crushing. In 1995 a chain-flail-dry drum debarking chipping unit was developed to improve and homogenize the quality of chips

  1. Integrated production of merchantable wood and wood fuels in industry; Teollisuuden ainespuun ja puupoltto-aineen integroitu tuotanto

    Energy Technology Data Exchange (ETDEWEB)

    Kuvaja, K. [Enso-Gutzeit Oy, Imatra (Finland). Forest Dept.

    1996-12-31

    The aim of this project is the economically profitable integrated harvesting of industrial wood and firewood especially in harvesting of small-diameter first thinning wood. The research in 1994 was concentrated on improvement of the quality of the chipping methods based on chain-flail debarking chipping method, and on determination of the possible utilization targets for the fuel fraction. A reasonably large drum debarking test was also carried out at the industrial scale debarking station of the Enocell Oy. More than 80 000 m{sup 3} of first thinning wood was delivered by Enocell during this project. The quality of wood chips, produced using the chain-flail delimbing method, could be improved in the case of pine nearly to the required quality level, but additional measures are still needed in the case of birch. The fuel fraction deliveries to different points of utilization was started. The particle size of the fuel fraction appeared to be good after crushing. In 1995 a chain-flail-dry drum debarking chipping unit was developed to improve and homogenize the quality of chips

  2. Tarkkaturve - Peat production on shallow fields; Tarkkaturve - mataloituvien soiden tuotantomenetelmien ja laitteiden kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Nurminen, T; Honkanen, J; Jormalainen, R; Laaksoharju, T; Rytkoenen, P; Viitanen, J [Vapo Oy, Jyvaeskylae (Finland); Aho, V J; Aalto, J; Kallio, M; Leinonen, A.; Tiihonen, I [VTT Energy, Jyvaeskylae (Finland)

    1997-12-01

    It is important to produce the peat of the bogs under production as completely as possible when improving the efficiency and economy of milled peat production. Hence the service life of bog areas is being extended, and the investment costs per produced peat mass are decreased. Research, in which new planning, production and ditching methods, as well as production machines for production from shallowing fields, has been carried out in order to obtain the targets. Data obtained from charting of the bog, by which it is possible to take the regional differences of the production areas into account while planning and making of the production strips and ditching, is used in planning of the production fields. Stones are removed from the strips on the mineral soil areas during preparation of the fields, and peat is conveyed from the depletable areas into production strips, hence it is possible to make ditching with open ditches excavated into mineral soil. The new milled peat production machines are lighter than the older ones, and non-sparkling materials, e.g. plastics, are used in the construction of them in every phase of the production. The new machines are able to operate on strips of varying width and on the fields of poor load carrying capacity. Brushing technology is used in collection of peat. By this method it is possible to improve in addition to the fire safety, also the collecting accuracy, and hence the efficiency of the production. The new methods and equipment developed in the researches are now in wide utilisation in Finnish peat production. (orig.)

  3. A combimachine for harvesting of small sized trees; Pienpuun keraeilykaatoon perustuvan harvennuskoneen kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Lilleberg, R [Metsaeteho, Helsinki (Finland)

    1997-12-31

    The goal of the project was to develop a combimachine suitable for the harvesting of small sized trees in first thinning. The use of such a machine could considerably decrease harvesting costs in first thinning. The basic idea with the combimachine is, that the same machine both fells the trees and transports the timber to roadside storages. A forwarder was equipped with a lightweight felling device, which also can do the crosscutting and loading. When harvesting undelimbed timber the forwarder could be equipped with a load-compressing device. During the spring 1995 a trial was made with a combimachine in a first thinning stand of pine. An ordinary forwarder was equipped with the `Naarva-grapple` a device for felling, crosscutting and loading. The aim was to test how the felling device is working, to examine time expenditure for two different working methods and to collect data for the further development of the machine. The trial showed a need to add a delimbing feature to the Naarva-grapple. The need for delimbing is based on the fact, obtained during the trial, that productivity in transport of delimbed timber was over 30 % higher than in transport of undelimbed pieces. A device capable of delimbing was designed, and it was ready for a prototype test in December 1995. The idea worked, but also showed a lot of details which have to be redesigned, before the device is ready for manufacturing and marketing

  4. TARKKATURVE - Peat production on shallow fields; TARKKATURVE - mataloituvien soiden tuotantomenetelmien ja laitteiden kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Nurminen, T. [Vapo Oy, Jyvaeskylae (Finland); Aho, V.J.; Tiihonen, I. [VTT Energy, Jyvaeskylae (Finland)

    1996-12-31

    It is important to produce the peat of the bogs under production as completely as possible when improving the efficiency and economy of milled peat production. Hence the service life of bog areas is being extended, and the investment costs per produced peat mass are decreased. Research, in which new planning, production and ditching methods, as well as production machines for production from shallowing fields, has been carried out in order to obtain the targets. Data obtained from charting of the bog, by which it is possible to take the regional differences of the production areas into account while planning and making of the production strips and ditching, is used in planning of the production fields. Stones are removed from the strips on the mineral soil areas during preparation of the fields, and peat is conveyed from the depleted areas into production strips, hence it is possible to make ditching with open ditches excavated into mineral soil. The new milled peat production machines are lighter than the older ones, and non-sparkling materials, e.g. plastics, are used in the construction of them in every phase of the production. The new machines are able to operate on strips of varying width and on the fields of poor load carrying capacity. Brushing technology is used in collection of peat. By this method it is possible to improve in addition to the fire safety, also the collecting accuracy, and hence the efficiency of the production. The new methods and equipment developed in the researches are now in wide utilization in Finnish peat production

  5. A combimachine for harvesting of small sized trees; Pienpuun keraeilykaatoon perustuvan harvennuskoneen kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Lilleberg, R. [Metsaeteho, Helsinki (Finland)

    1996-12-31

    The goal of the project was to develop a combimachine suitable for the harvesting of small sized trees in first thinning. The use of such a machine could considerably decrease harvesting costs in first thinning. The basic idea with the combimachine is, that the same machine both fells the trees and transports the timber to roadside storages. A forwarder was equipped with a lightweight felling device, which also can do the crosscutting and loading. When harvesting undelimbed timber the forwarder could be equipped with a load-compressing device. During the spring 1995 a trial was made with a combimachine in a first thinning stand of pine. An ordinary forwarder was equipped with the `Naarva-grapple` a device for felling, crosscutting and loading. The aim was to test how the felling device is working, to examine time expenditure for two different working methods and to collect data for the further development of the machine. The trial showed a need to add a delimbing feature to the Naarva-grapple. The need for delimbing is based on the fact, obtained during the trial, that productivity in transport of delimbed timber was over 30 % higher than in transport of undelimbed pieces. A device capable of delimbing was designed, and it was ready for a prototype test in December 1995. The idea worked, but also showed a lot of details which have to be redesigned, before the device is ready for manufacturing and marketing

  6. An approach to quality classification of deep groundwaters in Sweden and Finland

    International Nuclear Information System (INIS)

    Laaksoharju, M.; Smellie, J.; Ruotsalainen, P.; Snellman, M.

    1993-11-01

    In Sweden and Finland high quality groundwater samples are required in the site characterization programmes relating to safe disposal of spent nuclear fuel. SKB (Swedish Nuclear Fuel and Waste Management Co.) and TVO (Teollisuuden Voima Oy, Finland) initiated a cooperative task to critically evaluate the quality of the earlier sampling programmes and to further develop the understanding of quality or representativeness of the groundwater samples. The major aim in this report has been, therefore, to make an attempt to classify groundwaters from site investigations in Sweden and Finland based on quality. Different classification systems have been tested and developed. These can be divided in two main groups; manual methods and computer-based mathematical methods. Manual, statistical, mixing ratio and scoring systems have all been used to illustrate the difficulty in judging groundwater quality. (28 refs., 19 figs., 11 tabs.)

  7. Advanced control and instrumentation systems in nuclear power plants. Design, verification and validation

    International Nuclear Information System (INIS)

    Haapanen, P.

    1995-01-01

    The Technical Committee Meeting on design, verification and validation of advanced control and instrumentation systems in nuclear power plants was held in Espoo, Finland on 20 - 23 June 1994. The meeting was organized by the International Atomic Energy Agency's (IAEA) International Working Group's (IWG) on Nuclear Power Plant Control and Instrumentation (NPPCI) and on Advanced Technologies for Water Cooled Reactors (ATWR). VTT Automation together with Imatran Voima Oy and Teollisuuden Voima Oy responded about the practical arrangements of the meeting. In total 96 participants from 21 countries and the Agency took part in the meeting and 34 full papers and 8 posters were presented. Following topics were covered in the papers: (1) experience with advanced and digital systems, (2) safety and reliability analysis, (3) advanced digital systems under development and implementation, (4) verification and validation methods and practices, (5) future development trends. (orig.)

  8. Human and organisational factors influencing the reliability of non-destructive testing. An international literary survey

    International Nuclear Information System (INIS)

    Kettunen, J.; Norros, L.

    1996-04-01

    The aim of the study is to chart human and organisational factors influencing the reliability of non-destructive testing (NDT). The emphasis will be in ultrasonic testing (UT) and in the planning and execution of in-service inspections during nuclear power plant maintenance outages. Being a literary survey this study is mainly based on the foreign and domestic research available on the topic. In consequence, the results presented in this report reflect the ideas of international research community. In addition to this, Finnish nuclear power plant operators (Imatran Voima Oy and Teollisuuden Voima Oy), independent inspection organisations and the Finnish Centre for Radiation and Nuclear Safety have provided us with valuable information on NDT theory and practice. Especially, a kind of 'big picture' of non-destructive testing has been pursued in the study. (6 figs., 2 tabs.)

  9. Human and organisational factors influencing the reliability of non-destructive testing. An international literary survey; Inhimillisten ja organisatoristen tekijoeiden yhteys NDT- tarkastusten luotettavuuteen. Katsaus kansainvaeliseen kirjallisuuteen

    Energy Technology Data Exchange (ETDEWEB)

    Kettunen, J.; Norros, L.

    1996-04-01

    The aim of the study is to chart human and organisational factors influencing the reliability of non-destructive testing (NDT). The emphasis will be in ultrasonic testing (UT) and in the planning and execution of in-service inspections during nuclear power plant maintenance outages. Being a literary survey this study is mainly based on the foreign and domestic research available on the topic. In consequence, the results presented in this report reflect the ideas of international research community. In addition to this, Finnish nuclear power plant operators (Imatran Voima Oy and Teollisuuden Voima Oy), independent inspection organisations and the Finnish Centre for Radiation and Nuclear Safety have provided us with valuable information on NDT theory and practice. Especially, a kind of `big picture` of non-destructive testing has been pursued in the study. (6 figs., 2 tabs.).

  10. Anaerobic digestion of slaughterhouse waste to produce energy and fertilizer; Anaerobitekniikka muuttaa teollisuuden orgaaniset jaetteet energiaksi ja lannoitteeksi

    Energy Technology Data Exchange (ETDEWEB)

    Salminen, E.; Rintala, J.

    1999-07-01

    The concern over the re-use of organic wastes on ecological and economical lines is constantly increasing. Anaerobic digestion is gaining popularity as a means of organic waste management, for several reasons. Besides generating biogas for energy production, it also produces a stabilised byproduct with reduced pathogens and thus forms a valuable source of nutrients for agricultural crops. Our primary aim in this part of our work was to develop economically viable and ecologically feasible techniques for treating slaughterhouse waste. Biomethanation of one tonne of poultry slaughterhouse waste produced about 80-100 m{sup 3} of methane with 60-70% reduction in total solids. Ammonification of total organic nitrogen to ammonical nitrogen was about 60%. Evidently, the control of long chain fatty acids under anaerobic conditions is critical for fat-rich wastes. Preliminary assessment of the anaerobically digested poultry slaughterhouse waste confirms its potential as a source of organic fertilizer for agricultural use. (author)

  11. Development of a chain limber and its measuring automatics; Karsimakoneen ja sen mittausautomatiikan kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Poeytaesaari, E [Eskon Paja, Kinnula (Finland)

    1997-12-01

    A new control system and measuring automatics are developed for a patented chain limber mountable to a farm tractor. The chain limber produces pulp wood and also limbed fuel logs. The project will be carried out in three stages: definition of the control system, development of the control system, and operational testing of the control system and the chain limber. The final stage of the project will be carried out in co-operation with the Work Efficiency Association. (orig.)

  12. Development of a bundler for logging residues; Hakkuutaehteen tiivistykseen perustuvan niputuslaitteiston kehittaeminen - PUUY16

    Energy Technology Data Exchange (ETDEWEB)

    Pressler, F. [Biowatti Oy, Espoo (Finland); Nousiainen, I. [VTT Energy, Jyvaeskylae (Finland)

    2001-07-01

    Traditional logging residue purchase methods have based either on chipping at the lot or in the roadside storages. However, methods have been developed also for long-distance transportation of complete logging residues. In this case chipping would be carried out at the power plant. New methods, based on on-site chipping, are being developed for purchase of logging residues. The bundling equipment used in these purchase chains has been developed in Sweden. The purchase chains under development would enable the forest haulage and long-distance transportation of logging residues by present forest and long-distance transportation equipment, and it would ease the storage of logging residues. The objective of the project was to develop, on the basis of the idea of Biowatti a continuously operating logging residue bundling device. Because the success of compaction is the critical factor effecting on the operation of the equipment, the project was carried out in two stages. The objective of the first stage, presented in this report, was to develop, construct and test the compaction method. Several modifications were made to the device during the research. New tests were carried out after the modifications in order to determine the operation of the equipment, the compactness of the bundles, and determination of the further development required. The final version of the device was equipped with a feeding table in which the feeding of logging residues occurred by the aid of a lamellar chain track, equipped with shear keys, and with a pressing roller. Test runs showed that by using the continuous compression method, developed in the project, it possible to obtain the compression target (45 %). The capacity of the bundler could not be tested properly because the test runs were relatively short. The power demand and capacity measurements of the bundler will be carried out wider in the second part of the project, as soon as the compression equipment has been developed further. On the basis of the preliminary experiences, the weak point of the delivery chain of bundling has been e.g. the high investment costs of the bundler, and relatively low productivity of the device compared to investments. However, the project created a new solution, by which it is possible to improve the competitiveness of the purchase chain and hence to promote the development of a new purchase method for logging residues, supporting the methods already in use in Finland. (orig.)

  13. Finnish research programmes on nuclear power plant safety

    International Nuclear Information System (INIS)

    Puska, E. K.

    2010-01-01

    The current Finnish national research programme on nuclear power plant safety SAFIR2010 for the years 2007-2010 as well as the coming SAFIR2014 programme for the years 2011-2014 are based on the chapter 7a, 'Ensuring expertise', of the Finnish Nuclear Energy Act. The objective of this chapter is realised in the research work and education of experts in the projects of these research programmes. SAFIR2010 research programme is divided in eight research areas that are Organisation and human, Automation and control room, Fuel and reactor physics, Thermal hydraulics, Severe accidents, Structural safety of reactor circuit, Construction safety, and Probabilistic Safety Analysis (PSA). All the research areas include both projects in their own area and interdisciplinary co-operational projects. Research projects of the programme are chosen on the basis of annual call for proposals. In 2010 research is carried out in 33 projects in SAFIR2010. VTT is the responsible research organisation in 26 of these projects and VTT is also the coordination unit of SAFIR2010 and SAFIR2014. In 2007-2009 SAFIR2010 produced 497 Specified research results (Deliverables), 618 Publications, and 33 Academic degrees. SAFIR2010 programme covers approximately half of the reactor safety research volume in Finland currently. In 2010 the programme volume is EUR 7.1 million and 47 person years. The major funding partners are VYR with EUR 2.96 million, VTT with EUR 2.66 million, Fortum with EUR 0.28 million, TVO with EUR 0.19 million, NKS with EUR 0.15 million, EU with only EUR 0.03 million and other partners with EUR 0.85 million. The new decisions-in-principle on Olkiluoto unit 4 for Teollisuuden Voima and new nuclear power plant for Fennovoima ratified by the Finnish Parliament on 1 July 2010 increase the annual funding collected according to the Finnish Nuclear Energy Act from Fennovoima, Fortum and Teollisuuden Voima for the SAFIR2014 programme to EUR 5.2 million from the current level of EUR 3

  14. The geology of the Romuvaara area

    International Nuclear Information System (INIS)

    Anttila, P.; Paulamaeki, S.; Lindberg, A.; Paananen, M.; Pitkaenen, P.; Front, K.

    1990-12-01

    Teollisuuden Voima Oy (TVO) is preparing for the final disposal of spent uranium fuel from the Olkiluoto nuclear power plant deep in the Finnish bedrock. The report presents a summary of the geological conditions at Romuvaara in Kuhmo, which was one of the five areas selected in 1987 for the preliminary site investigations. The Romuvaara site and its surroundings belong to the Archaean basement complex, the age of the oldest parts of which is over 2800 Ma. The bedrock consists mainly of migmatic banded gneisses (tonalite, leucotonalite and mica gneiss). These rock types are intersected by granodiorite and metadiabase dykes. Proterozoic metadiabases represent the youngest rock unit in the area. Except for the metadiabase, the rocks have undergone a multiphase Archaean deformation. The bedrock structures are interpreted as representing six deformation phases, after which sharp faults developed during at least four further movement phases

  15. Development of the dimension and quality requirements for purchase chopwood; Ostopilkkeen mitta- ja laatuvaatimusten kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Maekelae, J [Work Efficiency Inst., Helsinki (Finland); Tuomi, S [Work Efficiency Inst., Rajamaeki (Finland)

    1997-12-31

    In total 5.6 million m{sup 3} of firewood, mainly a chopwood, was used in Finland for heating of small houses during the heating season 1992/1993. Two thirds of the firewood was acquired from own forests. The share of the purchased firewood was less than one fifth, corresponding to about 1.0 million m{sup 3}. More than a half of the small house owners, about 750 000, regards the purchase of firewood possible. Ready chopwood is the most desired form of purchase wood. The main problem in firewood trade is the lack of chopwood measurement and quality requirements. Also the chopwood volume measurement practice is inhomogeneous. These things render the development of commercial chopwood markets. This also renders the increment of firewood utilization especially in detached houses, where there are about 1.0 million underutilized fireplaces. The aim of the project is to promote the firewood trade and customer protection by making a proposal for volume measurement and the quality requirements for chopwood. The work will be carried out on the basis of data, based on field and laboratory measurements and a literature survey. The first part of this three year project was carried out in 1995

  16. Development of the dimension and quality requirements for purchase chopwood; Ostopilkkeen mitta- ja laatuvaatimusten kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Maekelae, J. [Work Efficiency Inst., Helsinki (Finland); Tuomi, S. [Work Efficiency Inst., Rajamaeki (Finland)

    1996-12-31

    In total 5.6 million m{sup 3} of firewood, mainly a chopwood, was used in Finland for heating of small houses during the heating season 1992/1993. Two thirds of the firewood was acquired from own forests. The share of the purchased firewood was less than one fifth, corresponding to about 1.0 million m{sup 3}. More than a half of the small house owners, about 750 000, regards the purchase of firewood possible. Ready chopwood is the most desired form of purchase wood. The main problem in firewood trade is the lack of chopwood measurement and quality requirements. Also the chopwood volume measurement practice is inhomogeneous. These things render the development of commercial chopwood markets. This also renders the increment of firewood utilization especially in detached houses, where there are about 1.0 million underutilized fireplaces. The aim of the project is to promote the firewood trade and customer protection by making a proposal for volume measurement and the quality requirements for chopwood. The work will be carried out on the basis of data, based on field and laboratory measurements and a literature survey. The first part of this three year project was carried out in 1995

  17. Research into basic rocks types

    International Nuclear Information System (INIS)

    1993-06-01

    Teollisuuden Voima Oy (TVO) has carried out research into basic rock types in Finland. The research programme has been implemented in parallel with the preliminary site investigations for radioactive waste disposal in 1991-1993. The program contained two main objectives: firstly, to study the properties of the basic rock types and compare those with the other rock types under the investigation; secondly, to carry out an inventory of rock formations consisting of basic rock types and suitable in question for final disposal. A study of environmental factors important to know regarding the final disposal was made of formations identified. In total 159 formations exceeding the size of 4 km 2 were identified in the inventory. Of these formations 97 were intrusive igneous rock types and 62 originally extrusive volcanic rock types. Deposits consisting of ore minerals, industrial minerals or building stones related to these formations were studied. Environmental factors like natural resources, protected areas or potential for restrictions in land use were also studied

  18. Summary report of the experiences from TVO's site investigations

    International Nuclear Information System (INIS)

    Oehberg, A.; Saksa, P.; Ahokas, H.; Ruotsalainen, P.; Snellman, M.

    1994-09-01

    In 1992 Teollisuuden Voima Oy (TVO) completed preliminary site investigations for radioactive waste disposal at five sites in Finland. The aim of this report was the compilation of the experiences from TVO's site investigations. The main interest was focused on investigation strategies and the most important investigation methods for the conceptual modelling. The objective of the preliminary site investigations was to obtain data on the bedrock properties in order to evaluate the areas. The programme was divided into four stages, each stage having its own subobjective. The site-specific investigation programme for each site included a large common part and a small site-specific part. The strategies (objectives) and experiences from different disciplines, geology, hydrogeochemistry, geophysics and geohydrology, are presented in the report. The conceptual modelling work procedure including both bedrock and groundwater modelling is described briefly using the Olkiluoto site as an example. Each of the other areas has undergone similar phases of work. (52 refs., 45 figs., 5 tabs.)

  19. Review of safety related control room function research based on experience from nuclear power plants in Finland

    International Nuclear Information System (INIS)

    Juslin, K.; Wahlstroem, B.; Rinttilae, E.

    1985-01-01

    A comprehensive human engineering research programme was established in the second half of the 1970's at the Technical Research Centre of Finland (VTT). The research is performed in cooperation with the utility companies Imatran Voima Oy (IVO) and Teollisuuden Voima Oy (TVO) and includes topics such as Handling of alarm information, Disturbance analysis systems, Assessment of control rooms and Validation of safety parameter display systems. Reference is also made to the Finnish contribution to the OECD Halden Reactor Project (Halden) and the Nordic Liaison Committee for Atomic Energy (NKA) research projects. In this paper feasible realization alternatives of safety related control room functions are discussed on the basis of experience from the nuclear power plants in Finland, which at present are equipped with extensive process computer systems. A proposal for future power plant information systems is described. It is intended that this proposal will serve as the basis for future computer systems at nuclear power plants in Finland. (author)

  20. Beliefs concerning the reliability of nuclear power plant in-service inspections; Uskomuksia ydinvoimalaitoksissa suoritettavien tarkastusten luotettavuudesta

    Energy Technology Data Exchange (ETDEWEB)

    Kettunen, J. [VTT Automation, Espoo (Finland)

    1997-01-01

    The aim of the study was to investigate belief systems held by the officials responsible for the planning and supervision of NDT operations within the Finnish nuclear industry. They were asked to express their opinions on (1) the reliability of NDT methods in general, (2) the factors influencing the reliability of in-service inspections, and (3) the degree of reliability of the current inspections operations conducted by means of NDT methods in the Finnish nuclear power plants. Another goal of the study was to assess the adequacy of officials` beliefs (or belief systems). The research data was collected by interviewing representatives from Finnish power companies (Imatran Voima Oy and Teollisuuden Voima Oy), independent inspection organisations, and the Finnish Centre for Radiation and Nuclear Safety (STUK). The adequacy of the beliefs expressed was assessed by means of the results obtained from international NDT reliability studies and on the basis of interviewees` own justification. (refs.).

  1. Beliefs concerning the reliability of nuclear power plant in-service inspections

    International Nuclear Information System (INIS)

    Kettunen, J.

    1997-01-01

    The aim of the study was to investigate belief systems held by the officials responsible for the planning and supervision of NDT operations within the Finnish nuclear industry. They were asked to express their opinions on (1) the reliability of NDT methods in general, (2) the factors influencing the reliability of in-service inspections, and (3) the degree of reliability of the current inspections operations conducted by means of NDT methods in the Finnish nuclear power plants. Another goal of the study was to assess the adequacy of officials' beliefs (or belief systems). The research data was collected by interviewing representatives from Finnish power companies (Imatran Voima Oy and Teollisuuden Voima Oy), independent inspection organisations, and the Finnish Centre for Radiation and Nuclear Safety (STUK). The adequacy of the beliefs expressed was assessed by means of the results obtained from international NDT reliability studies and on the basis of interviewees' own justification. (refs.)

  2. OL1/OL2 License renewal for extended life-time: Class 1 piping load and strength analyses

    International Nuclear Information System (INIS)

    Lemettinen, P.

    2015-01-01

    Teollisuuden Voima Oyj (TVO) operates two NPP units Olkiluoto 1 (OL1) and Olkiluoto 2 (OL2), that are identical 880 MWe BWRs. The units were originally designed for 40 years life-time. TVO is applying license renewal for extended life-time for 60 years plant life. Part of the license renewal project is to evaluate and update all Class 1 piping load and strength analyses. These analyses are done with the help of TVO's in-house Piping and Component Analysis and Monitoring System (PAMS). PAMS is basically a database system, consisting of separate geometry, material, loading, result and document databases. The thermo hydraulic analysis program RELAP5 is used to obtain temperature, pressure and mass flow for the piping loading areas. The piping strength analysis are carried out mainly with the Finnish FPIPE FEA program for all related thermal transient and dynamic load cases. The slides of the presentation have been added to the paper

  3. Simulation of the groundwater flow of the Kivetty area

    International Nuclear Information System (INIS)

    Taivassalo, V.; Meszaros, F.

    1994-02-01

    Teollisuuden Voima Oy (TVO) is preparing for the final disposal of spent nuclear fuel into crystalline bedrock in Finland. Groundwater flow modelling is a part of the preliminary site investigation work. The aim is to simulate groundwater flow as realistically as possible in view of the experimental data available. Three dimensional groundwater flow modelling is based on a conceptual bedrock model. The modelling results will be used in the site evaluation process. Observations from flow simulations will also be used to identify and study uncertainties included in the site characterization. First a conceptual flow model for the Kivetty site in Konginkangas was developed. As a second stage the flow model was calibrated. The goal was to increase the reality of the model. To evaluate the reality of the flow model, the values of the input and output parameters were compared with the field data. Finally groundwater flow simulation results were computed and groundwater flow at the Kivetty area was analysed. (50 refs., 78 figs., 7 tabs.)

  4. LARGE-scale forest fuel supply solution trough a regional terminal network; Terminaalitoimintoihin perustuvan metsaepolttoaineen hankintalogistiikkajaerjestelmaen kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Leppaenen, T. [Etelae-Savon Energia Oy, Mikkeli (Finland)

    2006-12-19

    The aim of the study is to develop logistic systems for supply of forest fuel where a terminal is part of the supply chain. Operations in the terminal, supply chains of the forest fuel and joining them to the terminal network are testing and following p. Also operation and business models are under analyzing. Costs, cost factors, benefits and space requirement of the terminal and cost-effectiveness of the entrepreneurship of the terminal are carried out. (orig.)

  5. Economy and development of heating station enterprises managed by forest owners; Metsaenomistajien laempoeyrittaemisen talous ja kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Tuomi, S [Work Efficiency Inst., Rajamaeki (Finland)

    1997-12-01

    Private heating enterprises are a new form of heat generation for municipalities in Finland. In this type the entrepreneur acquires the fuel and takes care of the operation and monitoring of the heating station. The recompense is paid on the basis of the heat amount produced to avoid problems related to i.e. the energy content and quality of the fuel. The price of heat is typically bound with that of light fuel oil. Agreements based on the price development of district heat and chips are also used. In 1996 there were 36 such heating enterprises in operation in Finland, their total efficiency being 11.5 MW. The aim of the project is to improve the feasibility of various forms of heating enterprises and to start new heating enterprises. The feasibility is studied both from the viewpoint of the entrepreneur and the municipality. The feasibility is improved by developing production chains of heating enterprises and the operability of the heating stations. Establishment of new heating enterprises is promoted by producing and disseminating information to possible entrepreneurs and municipalities. (orig.)

  6. Development of chain limbing and small-drum barking equipment; Ketjukarsinta- ja pienrumpukuorintaan perustuvan laitteiston kehittaeminen tuotantovalmiiksi

    Energy Technology Data Exchange (ETDEWEB)

    Rieppo, K [Metsaeteho Oy, Helsinki (Finland); Hakkila, P; Kalaja, H [Finnish Forest Research Inst., Vantaa (Finland)

    1997-12-01

    Three test series were carried out in 1996 at the chain limbing- drum barking station developed by Pertti Szepaniak Oy. The test equipment was developed during the test series. During the first experiment in February the wood used was frozen. In this test series the whipping efficiency was insignificant and consequently, the bark contents remained too large. In the second test in September the whipping efficiency was too high and was not easy to adjust, and as a consequence the wood loss was unreasonable. In the third test in November, when the wood was not yet frozen, the whipping efficiency was correct and promising results were obtained both with regard to the bark content and wood loss. Limbed pine pulpwood was used as raw material. The bark contents of the chips ranged from 0.2 to 0.4 % and the wood loss in barking from 2.8 to 3.6 %. The productivity also improved clearly during the tests. The experiments indicated that a separate station based on a combination of chain limbing- barking and drum-barking is able to produce high-grade pulp chips both from limbed and non-limbed first-thinning pine wood. (orig.)

  7. Development of a feeder device for logging residue for a drum chipper; Hakkurin syoetoen kehittaeminen energiapuulle

    Energy Technology Data Exchange (ETDEWEB)

    Leinonen, T.; Kemppainen, J P [Oulu Univ. (Finland). Dept. of Mechanical Engineering

    1997-12-01

    The aim of this project is to increase the productivity of a large drum chipper by developing a feeder device to be used especially when chipping logging residue. Logging residue from regeneration areas is the most important reserve of forest biomass for the production of renewable energy in Finland. It is possible ecologically and economically to use about 5 million m{sup 3} of logging residue yearly for energy purposes. Currently both large lorry based chippers and smaller forwarder based chippers are used for chipping logging residue. However even the latest versions of these chippers are not well equipped for chipping logging residue. The ball like shape of residue piles causes blockades, if too large amounts of residue are fed into the chipper. Keeping the material flow even is difficult. In this project a prototype of a feeder device will be designed and manufactured to exactly find out the problems, that occur when feeding logging residue to a chipper. The designed prototype is based on a tubular chassis, which supports a conveyor made of steel plates. Prototype also has a 2,5 m wide feeding table and a feeder roll, which is located above the conveyor just before the chipper opening. Both the conveyor and the feeder roll are powered by hydraulic motors. The maximum feeding force is 20 kN. For research purposes both hydraulic pressure and flow can be adjusted individually for both motors. During 1996 activities included designing and building the prototype feeder device. In 1997 the prototype will be tested to find out possible problems, which need to be cured. After problems are solved and other improvements are made, the feeder device will be installed to an existing chipper and then tested again to determine the productivity of the new feeder device compared to the old unit. (orig.)

  8. Development of safety assessment of nuclear power plants using indicators; Ydinvoimalaitosten turvallisuuden arvioinnin kehittaeminen tunnuslukujen avulla

    Energy Technology Data Exchange (ETDEWEB)

    Tiippana, P.

    1997-11-01

    The study is based on an indicator system which is under development at the Radiation and Nuclear Safety Authority (STUK). The goal of this study was to define and develop both PSA-based indicators and indicators from failure statistics. As PSA-based indicators the possibility was studied to define and express the risk importance of exemptions from the Technical Specifications, failures, preventive maintenance and other disconnections of devices covered by the Technical Specifications, operating events covered by Guide YVL 1.5 and plant modifications. In this piece of research the applicability of plant specific living PSA-models used for calculation of indicators was examined. The research included both Loviisa and Olkiluoto nuclear power plants in Finland. 47 refs.

  9. Bedrock Model of the Syyry area

    International Nuclear Information System (INIS)

    Saksa, P.; Kuivamaeki, A.; Kurimo, M.; Paananen, M.; Anttila, P.; Front, K.; Pitkaenen, P.; Hassinen, P.; Ylinen, A.

    1993-09-01

    Preliminary site investigations implemented in accordance with the research programme drawn up by Teollisuuden Voima Oy (TVO) were carried out at Syyry (in Finland) in 1987-1992. Models of the site were compiled and used for describing the rock types, fracturing, fracture structures and geohydrological conditions, the main emphasis being on the examination of the bedrock fracturing and related hydraulic conductivity. Three-dimensional models were used for the classification of the various properties of the bedrock structures. The descriptive models were gathered into a computer system to facilitate illustration and storage. The main rock type at Syyry is tonalite. A mica gneiss formation SE of the investigation site dips towards the NW and delimits the tonalite as far as the central part of the investigation site. The miga gneiss has a heterogeneous composition and includes intermediate layers consisting of quartz feldspar schist and amphibolite. There are mafic formations in the vicinity of the investigation site. The intrusive rocks have been deformed during three plastic and three mainly brittle deformation stages. (47 refs., 61 figs.)

  10. Experimental testing of an ABB Master application

    International Nuclear Information System (INIS)

    Haapanen, P.; Maskuniitty, M.; Korhonen, J.; Tuulari, E.

    1995-10-01

    A prototype dynamic testing harness for programmable automation systems has been specified and implemented at the Technical Research Centre of Finland (VTT). In order to get experience on the methodology and equipment for the testing of systems important to the safety of nuclear power plants, where the safety and reliability requirements often are very high, two different pilot systems have been tested. One system was an ABB Master application, which was loaned for testing from ABB Atom by Teollisuuden Voima Oy (TVO). Another system, loaned from Siemens AG (SAG) by IVO International Oy (IVO), was an application realized with SAG's digital SILT technology. The report describes the experiences gained in testing an APRM pilot system realized with ABB Master technology. The testing of the pilot application took place in the VTT Automation laboratory in Otaniemi in September-October 1994. The purpose of the testing was not to assess the quality of the pilot system, but to get experience in the testing methodology and find out the further development needs and potentials of the test methodology and equipment. (7 refs., 14 figs., 9 tabs.)

  11. Local negotiation on compensation siting of the spent nuclear fuel repository in Finland

    International Nuclear Information System (INIS)

    Kojo, Matti

    2007-01-01

    The aim of the paper is to analyse the local negotiation process between the Municipality of Eurajoki and the nuclear power company Teollisuuden Voima (TVO) and the nuclear waste management company Posiva Oy. The aim of the negotiations was to find an acceptable form of compensation for siting a spent nuclear fuel repository in Olkiluoto, Finland. The paper includes background information on the siting process in Finland, the local political setting in the Municipality of Eurajoki and a description of the negotiation process. The analysis of the negotiations on compensation is important for better understanding the progress of the Finnish siting process. The paper describes the picture of the contest to host the spent nuclear fuel repository. It also provides more information on the relationship between the Municipality of Eurajoki and the power company TVO. The negotiations on compensation and the roles of various players in the negotiations have not been studied in detail because the minutes of the Vuojoki liaison group were not available before the decision of the Supreme Administrative Court in May 2006. (author)

  12. TVO-92 safety analysis of spent fuel disposal

    International Nuclear Information System (INIS)

    Vieno, T.; Hautojaervi, A.; Koskinen, L.; Nordman, H.

    1993-08-01

    The spent fuel from the TVO I and TVO II reactors at the Olkiluoto nuclear power plant is planned to be disposed in a repository constructed at a depth of about 500 meters in crystalline bedrock. Teollisuuden Voima Oy (TVO) has carried out preliminary site investigations for spent fuel disposal between 1987 and 1992 at five areas in Finland (Olkiluoto, Kivetty, Romuvaara, Syyry and Veitsivaara). The Safety analysis of the disposal system is presented in the report. Spent fuel will be encapsulated in composite copper-steel canisters. The canister design (ACP canister) consists of an inner container of steel as a load-bearing element and an outer container of oxygen-free copper to provide a shield against corrosion. In the repository the canisters will be emplaced in vertical holes drilled in the floors of horizontal deposition tunnels. The annulus between the canister and the rock is filled with compacted bentonite. The results of the safety analysis attest that the planned disposal system fulfils the safety requirements. Suitable places for the repository can be found at each of the five investigation sites

  13. Compiling Utility Requirements For New Nuclear Power Plant Project

    International Nuclear Information System (INIS)

    Patrakka, Eero

    2002-01-01

    Teollisuuden Voima Oy (TVO) submitted in November 2000 to the Finnish Government an application for a Decision-in-Principle concerning the construction of a new nuclear power plant in Finland. The actual investment decision can be made first after a positive decision has been made by the Government and the Parliament. Parallel to the licensing process, technical preparedness has been upheld so that the procurement process can be commenced without delay, when needed. This includes the definition of requirements for the plant and preliminary preparation of bid inquiry specifications. The core of the technical requirements corresponds to the specifications presented in the European Utility Requirement (EUR) document, compiled by major European electricity producers. Quite naturally, an amount of modifications to the EUR document are needed that take into account the country- and site-specific conditions as well as the experiences gained in the operation of the existing NPP units. Along with the EUR-related requirements concerning the nuclear island and power generation plant, requirements are specified for scope of supply as well as for a variety of issues related to project implementation. (author)

  14. Geophysical investigations in the Veitsivaara area, Finland summary report

    International Nuclear Information System (INIS)

    Heikkinen, E.; Saksa, P.; Hinkkanen, H.

    1991-10-01

    Teollisuuden Voima Oy (TVO carries out site investigations in Finland for final disposal of nuclear high level waste during 1987-2000. Investigations by geological, geophysical, geohydrological and geochemical methods were carried out in the Veitsivaara area in 1987-90 to determine the suitability of the bedrock for the final disposal of spent nuclear fuel. Airborne, ground and borehole geophysical methods were used to study the rock type distribution, fracturing and hydraulic conductivity. Airborne surveys were performed by magnetic, radiometric and two electromagnetic methods and ground investigations by VLF magnetic and resistivity, magnetic and impulse radar methods. Electromagnetic and seismic refraction surveys were used to locate crushed and fracture zones. The properties of weak electrical conductors, e.g. their depth dimensions, were studied by direct current resistivity measurements. The rock type distribution was studied by single-hole logging of susceptibility, natural γ-radiation and radiometric γ γ-density. Electrical and acoustic logging allowed water bearing fractures to be mapped and the results of water injection tests to be interpreted. Flow conditions in the boreholes were studied by both fluid logging and tube wave sounding

  15. Evaluation of the dose assessment models for routine radioactive releases to the environment

    International Nuclear Information System (INIS)

    Rossi, J.

    1998-05-01

    The aim of the work was to evaluate the needs of development concerning the dose calculation models for routine releases and application of the models for exceptional release situations at the NPP plants operated by Imatran Voima Ltd. and Teollisuuden Voima Ltd. in Finland. First, the differences of the calculation models concerning input data, models themselves and output are considered. Subsequently some single features like importance of nuclides in exposure pathways due to change of the release composition, dose calculation for children and importance of time period of particle releases are considered. The existing dose calculation model used by the radiation safety authorities is aimed at a tool for checking the results from calculations of doses arising from routine releases by the power companies. Characteristics of an independent, foreign model and its suitability for safety authorities for dose calculations of releases in normal operation is also assessed. The needs of improvements in the existing calculation models and characteristics of a comprehensive model for safety authorities are discussed as well

  16. Development of sampling systems and special analyses for pressurized gasification processes; Paineistettujen kaasutusprosessien naeytteenottomenetelmien ja erityisanalytiikan kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Staahlberg, P.; Oesch, P.; Leppaemaeki, E.; Moilanen, A.; Nieminen, M.; Korhonen, J. [VTT Energy, Espoo (Finland)

    1996-12-01

    The reliability of sampling methods used for measuring impurities contained in gasification gas were studied, and new methods were developed for sampling and sample analyses. The aim of the method development was to improve the representativeness of the samples and to speed up the analysis of gas composition. The study focused on tar, nitrogen and sulphur compounds contained in the gasification gas. In the study of the sampling reliability, the effects of probe and sampling line materials suitable for high temperatures and of the solids deposited in the sampling devices on gas samples drawn from the process were studied. Measurements were carried out in the temperature range of 250 - 850 deg C both in real conditions and in conditions simulating gasification gas. The durability of samples during storage was also studied. The other main aim of the study was to increase the amount of quick-measurable gas components by developing on-line analytical methods based on GC, FTIR and FI (flow injection) techniques for the measurements of nitrogen and sulphur compounds in gasification gas. As these methods are suitable only for the gases that do not contain condensing gas components disturbing the operation of analysers (heavy tar compounds, water), a sampling system operating in dilution principle was developed. The system operates at high pressures and temperatures and is suitable for gasification gases containing heavy tar compounds. The capabilities of analysing heavy tar compounds (mole weight >200 g mol) was improved by adding the amount of compounds identified and calibrated by model substances and by developing analytical methods based on the high-temperature-GC analysis and the thermogravimetric method. (author)

  17. Development of firewood harvesting in first thinnings made by forest owners; Polttopuun korjuun kehittaeminen metsaenomistajien tekemissae ensiharvennuksissa

    Energy Technology Data Exchange (ETDEWEB)

    Maekelae, J [Work Efficiency Inst., Helsinki (Finland); Ryynaenen, S [Work Efficiency Inst., Rajamaeki (Finland)

    1997-12-31

    The aim of the project was to increase the forest owners` own usage and deliveries of firewood. The competitiveness of the firewood was improved by developing new machines, devices and working methods for first thinnings in cooperation with machine and device manufacturers and inventors. Field tests were made during three and a half years with 16 new firewood harvesting machines and devices. Several solutions for machine felling of small wood and chunkwood were developed to serial production level. The work studies offered basic material for compiling of a cost calculation model for small-scale production of wood chips and chunkwood. The first version of the model was prepared. Basic material was collected for development of the activities and for heating contractor guide using the follow-up studies of the heating contractor targets. Firewood procurement was analysed at two district heating plants. The results of the project were reported in the form of reports, journal articles and presentations, and in exhibitions

  18. Development of firewood harvesting in first thinnings made by forest owners; Polttopuun korjuun kehittaeminen metsaenomistajien tekemissae ensiharvennuksissa

    Energy Technology Data Exchange (ETDEWEB)

    Maekelae, J. [Work Efficiency Inst., Helsinki (Finland); Ryynaenen, S. [Work Efficiency Inst., Rajamaeki (Finland)

    1996-12-31

    The aim of the project was to increase the forest owners` own usage and deliveries of firewood. The competitiveness of the firewood was improved by developing new machines, devices and working methods for first thinnings in cooperation with machine and device manufacturers and inventors. Field tests were made during three and a half years with 16 new firewood harvesting machines and devices. Several solutions for machine felling of small wood and chunkwood were developed to serial production level. The work studies offered basic material for compiling of a cost calculation model for small-scale production of wood chips and chunkwood. The first version of the model was prepared. Basic material was collected for development of the activities and for heating contractor guide using the follow-up studies of the heating contractor targets. Firewood procurement was analysed at two district heating plants. The results of the project were reported in the form of reports, journal articles and presentations, and in exhibitions

  19. Final disposal of spent nuclear fuel in the Finnish bedrock

    International Nuclear Information System (INIS)

    1992-12-01

    Teollisuuden Voima Oy (TVO) studies Finnish bedrock for the final disposal of the spent nuclear fuel from the Olkiluoto nuclear power plant. The study is in accordance with the decision in principle by Finnish government in 1983. The report is the summary of the preliminary site investigations carried out during the years 1987-1992. On the basis of these investigations a few areas will be selected for detailed site investigation. The characterization comprises five areas selected from the shortlist of potential candidate areas resulted in the earlier study during 1983-1985. Areas are located in different parts of Finland and they represent the main formations of the Finnish bedrock. Romuvaara area in Kuhmo and Veitsivaara area in Hyrynsalmi represent the Archean basement. Kivetty area in Konginkangas consists of mainly younger granitic rocks. Syyry in Sievi is located in transition area of Svecofennidic rocks and granitic rocks. Olkiluoto in Eurajoki represents migmatites in southern Finland. For the field investigations area-specific programs were planned and executed. The field investigations have comprised airborne survey by helicopter, geophysical surveys, geological mappings and samplings, deep and shallow core drillings, geophysical and hydrological borehole measurements and groundwater samplings

  20. Fuel cycle management in Finland

    International Nuclear Information System (INIS)

    Vaeyrynen, H.; Mikkola, I.

    1987-01-01

    Both Finnish utilities producing nuclear power - Imatran Voima Oy (IVO) and Teollisuuden Voima Oy (Industrial Power Co. Ltd, TVO) - have created efficient fuel cycle management systems. The systems however differ in almost all respects. The reason is that the principal supplier for IVO is the Soviet Union and for TVO is Sweden. A common feature of both systems at the front end of the cycle is the building of stockpiles in order to provide for interruptions in fuel deliveries. Quality assurance supervision at the fuel factory for IVO is regulated by the Soviet Chamber of Commerce and Industry and a final control is made in Finland. The in-core fuel management is done by IVO using codes developed in Finland. The whole IVO fuel cycle is basically a leasing arrangement. The spent fuel is returned to the USSR after five years cooling. TVO carries out the in-core fuel management using a computer code system supplied by Asea-Atom. TVO is responsable for the back end of the cycle and makes preparations for the final disposal of the spent fuel in Finland. 6 refs., 2 figs

  1. Production methods and costs of oxygen free copper canisters for nuclear waste disposal

    International Nuclear Information System (INIS)

    Aalto, H.; Rajainmaeki, H.; Laakso, L.

    1996-10-01

    The fabrication technology and costs of various manufacturing alternatives to make large copper canisters for disposal of spent nuclear fuel from reactors of Teollisuuden Voima Oy (TVO) and Imatran Voima Oy (IVO) are discussed. The canister design is based on the Posiva's concept where solid insert structure is surrounded by the copper mantle. During recent years Outokumpu Copper Products and Posiva have continued their work on development of the copper canisters. Outokumpu Copper Products has also increased capability to manufacture these canisters. In the study the most potential manufacturing methods and their costs are discussed. The cost estimates are based on the assumption that Outokumpu will supply complete copper mantles. At the moment there are at least two commercially available production methods for copper cylinder manufacturing. These routes are based on either hot extrusion of the copper tube or hot rolling, bending and EB-welding of the tube. Trial fabrications has been carried out with both methods for the full size canisters. These trials of the canisters has shown that both the forming from rolled plate and the extrusion are possible methods for fabricating copper canisters on a full scale. (orig.) (26 refs.)

  2. Ore potential of basic rocks in Finland

    International Nuclear Information System (INIS)

    Reino, J.; Ekberg, M.; Heinonen, P.; Karppanen, T.; Hakapaeae, A.; Sandberg, E.

    1993-02-01

    The report is associated with a study programme on basic rocks, which has the aim to complement the preliminary site investigations on repository for TVO's (Teollisuuden Voima Oy) spent nuclear fuel. The report comprises a mining enterprise's view of the ore potential of basic plutonic rocks in Finland. The ores associated with basic plutonic rocks are globally known and constitute a significant share of the global mining industry. The ores comprise chromium, vanadium-titanium-iron, nickel-copper and platinum group element ores. The resources of the metals in question and their mining industry are examined globally. A review of the use of these metals in the industry is presented as well. General factors affecting the mining industry, such as metal prices, political conjunctures, transport facilities, environmental requirements and raw material sources for the Finnish smelters have been observed from the point of view of their future effect on exploration activity and industrial development in Finland. Information on ores and mineralizations associated with Finnish basic rocks have been compiled in the report. The file comprises 4 chromium occurrences, 8 vanadium-titanium-iron occurrences, 13 PGE occurrences and 38 nickel-copper occurrences

  3. Fuel reliability experience in Finland

    International Nuclear Information System (INIS)

    Kekkonen, L.

    2015-01-01

    Four nuclear reactors have operated in Finland now for 35-38 years. The two VVER-440 units at Loviisa Nuclear Power Plant are operated by Fortum and two BWR’s in Olkiluoto are operated by Teollisuuden Voima Oyj (TVO). The fuel reliability experience of the four reactors operating currently in Finland has been very good and the fuel failure rates have been very low. Systematic inspection of spent fuel assemblies, and especially all failed assemblies, is a good practice that is employed in Finland in order to improve fuel reliability and operational safety. Investigation of the root cause of fuel failures is important in developing ways to prevent similar failures in the future. The operational and fuel reliability experience at the Loviisa Nuclear Power Plant has been reported also earlier in the international seminars on WWER Fuel Performance, Modelling and Experimental Support. In this paper the information on fuel reliability experience at Loviisa NPP is updated and also a short summary of the fuel reliability experience at Olkiluoto NPP is given. Keywords: VVER-440, fuel reliability, operational experience, poolside inspections, fuel failure identification. (author)

  4. Colloids or artefacts? A TVO/SKB cooperation project in Olkiluoto, Finland

    International Nuclear Information System (INIS)

    Laaksoharju, M.; Vuorinen, U.; Snellman, M.; Helenius, J.; Allard, B.; Pettersson, C.; Hinkkanen, H.

    1993-12-01

    TVO (Teollisuuden Voima Oy, Finland) initiated a co-operative task with SKB (Swedish Nuclear Fuel and Waste Management Co.) to critically evaluate colloid sampling methods at the test site in Olkiluoto, SW Finland. Three different colloid sampling methods were compared when sampling borehole OL-KR1 at 613-618 m depth. One possible way to make a conservative in-situ colloid estimation is to omit the contribution from calcite precipitation which is considered to be the main artefact. When this is made the inorganic colloid content (size 1-1000 nm) in Olkiluoto is 184 ±177 ppb consisting of clay minerals, silica, pyrite, goethite and magnesium oxide; the concentration of organic substances are around 100 ppb. The in-situ colloid concentration seems to be low which is in good agreement with experiences from years of sampling in similar environment and depths. The exercise shows the many difficulties encountered when sampling colloids. Small error in the planning, pump rate selection, a lack of precautionary measures, artefact sensitivity of the method etc have a tendency to affect significantly the results on the measured ppb colliod level

  5. Development of newly designed wood burning systems with low emissions and high efficiency; Tehokkaan ja vaehaepaeaestoeisen puulaemmitysjaerjestelmaen kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Hyytiaeinen, H [Tulisydaen Oy, Vantaa (Finland)

    1997-12-01

    The investigations in the project will focus on the combustion behaviour of wood burning systems of untreated wood fuels with batch-wise and quasi-continuous mechanical feeding. The objectives will be to minimise the pollutant release of these combustion systems during the different operational phases by a consequent optimisation of the fuel burning technique and to reduce the CO release by increasing the efficiency of the combustion. To reduce the pollutant release during the operation phases and to increase the efficiency, products of incomplete combustion i.e. carbon monoxide, toxic organic compounds like benzene, polycyclic aromatic hydrocarbons and soot have to be minimised in a further extent. For that the following goals will be attained: improvement of the mixing process of combustion gases in the reaction zones, averaging the residence time spectrum in the burnout zone reduction, of emissions during initial and burnout phase in firings with batch-wise feeding reduction of emissions under partial-load conditions in firings with quasi-continuous feeding, higher combustion stability even in case of changing fuel qualities, defining guidelines for the design of stoves and boilers with low emissions and high efficiency. By the foreseen reduction of the pollutant release and improved efficiency the environmental acceptance of wood combustion firings can be increased and for instance local restrictions can be removed. The project is funded in part by The European Commission in the framework of The Non Nuclear Energy Programme. (orig.)

  6. Development and implementation of a dustfree and efficient pneumatic harvesting method; Poelyttoemaen ja tehokkaan imukokoamismenetelmaen kehittaeminen ja kaeyttoeoenotto

    Energy Technology Data Exchange (ETDEWEB)

    Nurminen, T; Ruokolainen, O; Rytkoenen, P.; Saastamoinen, V. [Vapo Oy, Jyvaeskylae (Finland); Kallio, M.; Aalto, J.; Leinonen, A.; Mehto, M. [VTT Energy, Jyvaeskylae (Finland)

    1997-12-01

    The overall aim of the research work (1995 - 1998) is to develop dust separators of the pneumatic harvester, to eliminate dust emissions and to plan and implement a more efficient pneumatic harvesting method. New JIK-35/96 pneumatic harvesters equipped with four secondary separating cyclones (17 units) were taken into use in spring 1996. In addition, 15 JIK-35 pneumatic harvesters constructed earlier were modified dustfree. The mechanical strength of the harvesters was improved by after-installations and by changing the drive method during harvesting. JIK-35/96 pneumatic harvester (test unit) was developed further during summertime. The greatest modification was testing of three secondary cyclones with a larger diameter. Dust separation of the larger cyclones was poorer than that of cyclones with a smaller diameter. In test runs, the test unit collected peat about 10 % more than the other harvesters of JIK-35 type. The fuel consumption of the test unit was about a fifth higher than that of the conventional JIK-35 harvester (20 vs 25 l/h). The larger pneumatic harvester, a prototype of 45 m{sup 3}, operated as a whole as expected. Exhaust air from the settling chamber of the harvester, and dust distributed well to the four parallel cyclones. Problems were high power demand and low pressure in the harvesting bin compared to those of JIK-35/96. The peat harvesting efficiency of the prototype was less than 2 kg/s m(m = nozzle of 1 m width), while the corresponding value of JIK-35/96 ranged 2.5 - 4 kg/s m. In continuation, the aim is to eliminate problems of the prototype and to construct a more efficient version, i.e., by enlarging the width

  7. Development of a nanofiltration process for flotation treated paper mill waste water; Nanosuodatusprosessin kehittaeminen flotaatiokaesitellylle paperitehtaan jaetevedelle - EKT 08

    Energy Technology Data Exchange (ETDEWEB)

    Maenttaeri, M.; Nuortila-Jokinen, J.; Nystroem, M. [Lappeenranta Univ. of Technology (Finland). Dept. of Chemical Technology

    1998-12-31

    Nanofiltration was studied as a purification method of paper mill effluents so that the permeates could be used as press section shower water. The quality of ultrafiltered water was not assessed to be sufficiently high for that purpose. The low flux of nanofiltration membranes has restricted their use in the pulp and paper industry. This study showed that the performance of nanofiltration membranes can be improved by controlling the filtration conditions, like pH, flow velocity and pressure. It was demonstrated that a critical flux exists also for nanofiltration membranes. By adjusting the permeate flux below this critical value fouling should be low. The experiments with a spiral wound element showed its sensitivity to plugging by fibers and also the unsuitability of cartridge filters as safety filters for it. Better pretreatment methods are needed. A multilayer filter seemed to decrease the fouling of the nanofiltration element somewhat. However, a simple and cleanable pretreatment method still needs to be developed. Fouling experiments with model components pointed out the importance of pH and cross-flow velocity in minimizing fouling. (orig.) 8 refs. CACTUS Research Programme

  8. Development of a system for receiving, crushing and screening recycled fuel (REF) material; Kierraetyspolttoaineen vastaanotto-, murskaus- ja seulontajaerjestelmaen kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Nurmi, A.; Kurki, T.; Wrang, T. [BMH Wood Technology Oy, Rauma (Finland)

    1995-12-31

    The goal of this project is to develop a system to which source sorted combustible industrial, office and municipal waste material can be dumped to be handled in such way that it can be burnt in modern fluidized bed and circulating bed boilers. One drawback of present handling systems is the fact that most of them are more or less inapplicable for handling plastic materials, especially thin plastic films and sheets. Reducing plastic waste into a particle size of 50 mm required by modern fluidized bed boilers has proved to be very difficult. An essential part of this project is the development of waste material screening after primary and/or secondary crushing. The idea is to separate plastic particles larger than the maximum allowable size from the crushed material and then feed them to a separate low-capacity plastic crusher. The main stages of the project are: (1) Study and analysis on existing technology and equipment, (2) Development of system components, (3) Development of the system, (4) Building a pilot/demonstration plant, (5) Tests and analysis and (6) Decisions on further actions

  9. Development of a system for receiving, crushing and screening recycled fuel (REF) material; Kierraetyspolttoaineen vastaanotto-, murskaus- ja seulontajaerjestelmaen kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Nurmi, A; Kurki, T; Wrang, T [BMH Wood Technology Oy, Rauma (Finland)

    1996-12-31

    The goal of this project is to develop a system to which source sorted combustible industrial, office and municipal waste material can be dumped to be handled in such way that it can be burnt in modern fluidized bed and circulating bed boilers. One drawback of present handling systems is the fact that most of them are more or less inapplicable for handling plastic materials, especially thin plastic films and sheets. Reducing plastic waste into a particle size of 50 mm required by modern fluidized bed boilers has proved to be very difficult. An essential part of this project is the development of waste material screening after primary and/or secondary crushing. The idea is to separate plastic particles larger than the maximum allowable size from the crushed material and then feed them to a separate low-capacity plastic crusher. The main stages of the project are: (1) Study and analysis on existing technology and equipment, (2) Development of system components, (3) Development of the system, (4) Building a pilot/demonstration plant, (5) Tests and analysis and (6) Decisions on further actions

  10. Development of a machine combination for harvesting of small wood first thinnings; Yhdistelmaekoneen kehittaeminen pienpuun korjuuseen sekae ensi- harvennukseen

    Energy Technology Data Exchange (ETDEWEB)

    Nevalainen, P [Outokummun Metalli Oy, Outokumpu (Finland)

    1997-12-01

    The aim of the project is to build combined machine for the harvesting of the first thinning, which makes both harvesting and forwarding. Original purpose has been extended to concern also the harvesting head itself, which is connected to the base machine and which is able to perform cutting, delimbing and transportation. This method is only meant to be used to harvest energy wood. It should be developed the crown cutting method for this device. The basic idea of this harvesting head is usable, but technical solutions of functions should be reconstructed. The `guillotine-cutting` is usable. The diameter of cut stem should be 250-300 mm. In the future we will try to develop a device, which is able to make also delimbing if needed. This head is proper for first thinning harvesting. (orig.)

  11. Development of a system for receiving, crushing and screening recycled fuel (REF) material; Kierraetyspolttoaineen vastaanotto-, murskaus- ja seulontajaerjestelmaen kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Nurmi, A [VTT Energy, Jyvaeskylae (Finland)

    1997-12-01

    The goal of this project is to develop a system to which source sorted combustible industrial, office and municipal waste material can be taken and where it is then processed in such way that it can be burnt in modern fluidized bed and circulating bed boilers. The project started in the end of year 1995. The main stages of the project are: (1) Study and analysis of existing technology and equipment, (2) Development of system components, (3) Development of the system, (4) Building a pilot/demonstration plant, (5) Tests and results analysis and (6) Decisions on further actions. In the year 1996 the main stage was development of system components; especially crushing. Results of running slow-speed big crushers were collected, analysed and the main development details determined. Additionally, particle size distribution from different crushing methods were analyzed using also primary and secondary crushing. Development of a heavy-duty 2-rotor ECO-Crusher and a crushing screen was started. Regarding to the development of the REF-system, different alternatives have been analyzed and possible demonstration places have been searched. The first multi-crushing line will be demonstrated in Sweden. (orig.)

  12. Development of a nanofiltration process for flotation treated paper mill waste water; Nanosuodatusprosessin kehittaeminen flotaatiokaesitellylle paperitehtaan jaetevedelle - EKT 08

    Energy Technology Data Exchange (ETDEWEB)

    Maenttaeri, M; Nuortila-Jokinen, J; Nystroem, M [Lappeenranta Univ. of Technology (Finland). Dept. of Chemical Technology

    1999-12-31

    Nanofiltration was studied as a purification method of paper mill effluents so that the permeates could be used as press section shower water. The quality of ultrafiltered water was not assessed to be sufficiently high for that purpose. The low flux of nanofiltration membranes has restricted their use in the pulp and paper industry. This study showed that the performance of nanofiltration membranes can be improved by controlling the filtration conditions, like pH, flow velocity and pressure. It was demonstrated that a critical flux exists also for nanofiltration membranes. By adjusting the permeate flux below this critical value fouling should be low. The experiments with a spiral wound element showed its sensitivity to plugging by fibers and also the unsuitability of cartridge filters as safety filters for it. Better pretreatment methods are needed. A multilayer filter seemed to decrease the fouling of the nanofiltration element somewhat. However, a simple and cleanable pretreatment method still needs to be developed. Fouling experiments with model components pointed out the importance of pH and cross-flow velocity in minimizing fouling. (orig.) 8 refs. CACTUS Research Programme

  13. Development of a machine combination for harvesting of small wood and first thinnings; Yhdistelmaekoneen kehittaeminen pienpuun korjuuseen sekae ensiharvennukseen

    Energy Technology Data Exchange (ETDEWEB)

    Nevalainen, P; Kinnunen, K [Outokummun Metalli Oy, Outokumpu (Finland)

    1997-12-31

    The objective of the research was to develop a machine combination for harvesting of small wood, which carries out both the harvesting and forest haulage. The development was started in September 1995. The first prototype of the machine is ready. A Lokomo 910 forest tractor was acquired for the tests. The prototype has been mounted on the tractor, and the tests have been started in the beginning of March 1996. The reconstruction of the device will be made after the tests, as well as the description of different working praxis. Time consumption study and the analysis of it will be made after the equipment tests. The device consists of a grapple equipped with a guillotine cutting device mounted on the tractor. The actual felling is made stem by stem in the test phase. The stem can be forwarded directly into the load or it can be left aside, and new stems can be brought beside it and then all the stems can be taken together into load. The harvested stems can be processed easiest during the forwarding in the upward position, and they will be `felled` into the load space. Hence the space requirement is small so the damaging of the remaining trees can be minimized. The logging road is made driving backwards by felling the trees from the road to the sides of the road and by collecting the stems into load space while returning. The harvested stems will be transported undelimbed to the storage site there they can be processed with multi-function machine or chipped, after the thinning has been completed. The cutting device can be turned aside when using the loading grapple so the operation is similar to operation of an ordinary timber loader

  14. Development of a machine combination for harvesting of small wood and first thinnings; Yhdistelmaekoneen kehittaeminen pienpuun korjuuseen sekae ensiharvennukseen

    Energy Technology Data Exchange (ETDEWEB)

    Nevalainen, P.; Kinnunen, K. [Outokummun Metalli Oy, Outokumpu (Finland)

    1996-12-31

    The objective of the research was to develop a machine combination for harvesting of small wood, which carries out both the harvesting and forest haulage. The development was started in September 1995. The first prototype of the machine is ready. A Lokomo 910 forest tractor was acquired for the tests. The prototype has been mounted on the tractor, and the tests have been started in the beginning of March 1996. The reconstruction of the device will be made after the tests, as well as the description of different working praxis. Time consumption study and the analysis of it will be made after the equipment tests. The device consists of a grapple equipped with a guillotine cutting device mounted on the tractor. The actual felling is made stem by stem in the test phase. The stem can be forwarded directly into the load or it can be left aside, and new stems can be brought beside it and then all the stems can be taken together into load. The harvested stems can be processed easiest during the forwarding in the upward position, and they will be `felled` into the load space. Hence the space requirement is small so the damaging of the remaining trees can be minimized. The logging road is made driving backwards by felling the trees from the road to the sides of the road and by collecting the stems into load space while returning. The harvested stems will be transported undelimbed to the storage site there they can be processed with multi-function machine or chipped, after the thinning has been completed. The cutting device can be turned aside when using the loading grapple so the operation is similar to operation of an ordinary timber loader

  15. Operation of Finnish nuclear power plants. Quarterly report, 3rd quarter 1996

    International Nuclear Information System (INIS)

    Sillanpaeae, T.

    1997-02-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants are also described. The Report also includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. In the third quarter of 1996, the Finnish nuclear power plant units were in power operation except for the annual maintenance outages of Loviisa plant units and a shutdown at Olkiluoto 1 to identify and repair malfunctions of a high pressure turbine control valve. The load factor average of all plant units was 77.2%. Events in the third quarter of 1996 were classified level 0 on the International Nuclear Event Scale. Occupational doses and radioactive releases off-site were below authorised limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. The names of Teollisuuden Voima Oy's plant units have changed. Olkiluoto 1 and Olkiluoto 2 now replace the names TVO I and TVO II previously used in quarterly reports. (orig.)

  16. Seismic VSP and HSP surveys on preliminary investigation areas in Finland for final disposal of spent nuclear fuel

    International Nuclear Information System (INIS)

    Keskinen, J.; Cosma, C.; Heikkinen, P.

    1992-10-01

    Seismic reflection surveys in boreholes were carried out for Teollisuuden Voima Oy at five sites in Finland (Eurajoki Olkiluoto, Hyrynsalmi Veitsivaara, Konginkangas Kivetty, Kuhmo Romuvaara and Sievi Syyry). The vertical Seismic Profiling (VSP) surveys were a part of the investigation programme for the final disposal of spent nuclear fuel. The purpose was to detect fractured zones, lithological contacts and other anomalies in the structure of the rockmass and to determine their position and orientation. Horizontal Seismic Profiling (HSP) was used at the Olkiluoto site, additionally to VSP. The data has been organized in profiles containing seismograms recorded from the same shotpoint (shot gathers). One of the most powerful processing methods used with this project has been the Image Space Filtering, a new technique, which has been developed (in the project) for seismic reflection studies in crystalline rock. The method can be applied with other rock types where steeply inclined or vertical anomalies are of interest. It acts like a multichannel filter, enhancing the reflected events and also as an interpretation tool, to estimate the strength and position of the reflectors. This approach has been of great help in emphasizing the weak reflections from uneven and sometimes vanishing interfaces encountered in crystalline

  17. Development of objectives for the business operations and real estate management of the municipalities. Kuntien liikelaitostoimintojen ja kiinteistoenhoidon tavoitteellinen kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Kalliomaeki, M [Suomen Kunnallisliitto, Helsinki (Finland)

    1987-01-01

    In 1986 a research project was started dealing with the development of district heating, water supply and sewerage operations and real estate management of the municipalities. It was carried out as a test operation project in three municipalities: Asikkala, Hollola and Laukaa. It aimed at bringing about resources for a continuous development of the operations. The project ended formally by planning objectives for the year 1988. The development work in the test municipalities goes on. An all-inclusive method of development was applied in the project with the objective to combine theory and practice. The purpose was to find practical means of improving the profitability of the municipalities' district heating operations and real estate management under the prevailing conditions. The form of organisation or the accounting systems were not as such objects for the research but it was found that these do affect the profitability of operations, i.a. through the clarity of motivation and clarity of questions to do with responsibility and authority. According to the research, the applied contents- and profit-oriented control of operations improves the preconditions profitable municipal district heating operations and real estate management. However, the present means of control (planning, accounting and follow-up systems) used in the municipal administrations support an input-oriented type of leadership. For this reason, those rules which control i.a. the staff administration, planning practices, profit follow-up practices, accounting systems and the utilisation and functions of data technology should be developed to support a profit-oriented type of control.

  18. Summary report on groundwater chemistry

    International Nuclear Information System (INIS)

    Lampen, P.; Snellman, M.

    1993-07-01

    The preliminary site investigations for radioactive waste disposal (in Finland) carried out by Teollisuuden Voima Oy (TVO) during the period 1987 to 1992 yielded data on hydrogeochemistry from a total 337 water samples. The main objective of the groundwater chemistry studies was to characterize groundwaters at the investigation sites and, specifically, to create a concept for the mean residence times and evolution of groundwater by means of isotopic analyses. Moreover, the studies yielded input data for geochemical modelling and the performance assessment. Samples were taken from deep boreholes (with a depth of 500 to 1000 m), percussion-drilled boreholes (depth approx. 200 m), flushing-water wells (approx. 100 m) and multi-level pietzometers (approx. 100 m) used in the hydrological tests. The water used for drilling the deep boreholes was taken from local flushing-water wells, whose water was also analyzed in detail. The flushing water used in drilling was marked with two tracers, iodine and uranine, analyzed with two different methods. For reference purposes, samples were also taken from surficial and groundwaters over a large area surrounding the investigation site. Precipitation over a period of at least one year was collected at all the five investigation sites and the samples were analyzed in great detail, particularly with regard to isotopes. Similarly, snow profile samples representing precipitation during the entire winter was taken from each site at least once

  19. ROCK-CAD - computer aided geological modelling system

    International Nuclear Information System (INIS)

    Saksa, P.

    1995-12-01

    The study discusses surface and solid modelling methods, their use and interfacing with geodata. Application software named ROCK-CAD suitable for geological bedrock modelling has been developed with support from Teollisuuden Voima Oy (TVO). It has been utilized in the Finnish site characterization programme for spent nuclear fuel waste disposal during the 1980s and 1990s. The system is based on the solid modelling technique. It comprises also rich functionality for the particular geological modelling scheme. The ROCK-CAD system provides, among other things, varying graphical vertical and horizontal intersections and perspective illustrations. The specially developed features are the application of the boundary representation modelling method, parametric object generation language and the discipline approach. The ROCK-CAD system has been utilized in modelling spatial distribution of rock types and fracturing structures in TVO's site characterization. The Olkiluoto site at Eurajoki serves as an example case. The study comprises the description of the modelling process, models and illustration examples. The utilization of bedrock models in site characterization, in tentative repository siting as well as in groundwater flow simulation is depicted. The application software has improved the assessment of the sites studied, given a new basis for the documentation of interpretation and modelling work, substituted hand-drawing and enabled digital transfer to numerical analysis. Finally, aspects of presentation graphics in geological modelling are considered. (84 refs., 30 figs., 11 tabs.)

  20. Development of technics for separation and sorting system of different parts of field plants; Peltokasvien eri osien erottelu- ja lajittelutekniikoiden kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Lindh, T.; Kallio, E.; Taipale, R.; Leinonen, A.

    1996-12-31

    The aim of the research is to construct a segregation concept for an integrated method, by which it is possible to produce fiber fraction for pulping industry and byproduct fraction for energy production of the field plants to be processed. The starting point of the concept development was, that the method consists of the plant material processing phase, in which different plant components are segregated from each other, and a sorting phase in which the plant components are divided into different fractions on the basis of the use. Following topics were studied in the first year of this two year research: properties of spring-harvested reed canary grass and the component of it from the point of view of segregation, mechanical dry-processing methods for segregation of plant components from each other and sorting methods, by which the pulp fraction and by-product fraction are separated from each other. Chopping, crushing and milling have been studied as alternatives for processing. The particle size distribution of the produced material has been estimated. Sorting tests, based on air classification, have been made. Property analyses, such as ash content, have been made for different particle classes, by which the most suitable particle size class for sorting was determined. Processing and sorting research of chopped reed canary grass will be continued in 1996. Technical/economical analyses will be made of the costs of the separator by taking the alternatives, in which the separator unit operates at the farm or at the mill, into account. The final separation concept will be made using the results obtained in the experimental researches and cost analyses

  1. Teleperm M operating and control system OS520 is applicable for industrial steam power plants. Teleperm M:n operointi- ja valvontajaerjestelmae OS520 soveltuu teollisuuden hoeyryvoimalaitoksiin

    Energy Technology Data Exchange (ETDEWEB)

    Penttinen, I

    1994-01-01

    In many steam power plants the process control is carried out via monitors of the process stations using the keyboards. The Siemens OS520 operating and control system added into the system makes it possible to improve the operational and control reliability because it enable the process driving from both equipment. The system contains a graphic system for total graphical expression of the process flowcharts including the graphs and operation based on window technology, an alarm system including archiving and analysis capability on the basis of selection criteria, a reporting system, and archiving system for process data. The OS520 system uses mouse and alpha-numeric keyboard. A touch-up screen can also be selected. The operator display will be determined in programming stage. For this the OS520 system is equipped with a BIPRO program package. All the programming data created by BIPRO will be stored in a separate file. Hence, it is possible to make OS520 programming of a plant using several equipment simultaneously and to combine later the data made in this way in the final system. The screen is divided into three zones in order to fulfil the special requirements of the process control: the upper menu for display of the general view of the plant, the operational level for process control containing the process flowchart, graph and alarm displays, and a lower menu for process control containing the keyboard display. The critical operational functions can be locked using passwords, and the correctness of the given parameters can be checked. The alarm system collects and archives the events, e.g. alarms coming from the electric filter (disturbances, operational conditions, etc.). (1 fig.)

  2. Development of techniques for separation and sorting system of different parts of field plants; Peltokasvien eri osien erottelu- ja lajittelutekniikan kehittaeminen - 502

    Energy Technology Data Exchange (ETDEWEB)

    Lindh, T.; Kallio, E.; Paappanen, T.; Leinonen, A. [VTT Energy, Jyvaeskylae (Finland). Fuel Production

    1997-12-01

    The objective of this research was to construct a segregation concept for an integrated method, by which it is possible to produce fibre fraction for pulping industry and by-product fraction for energy production of the field plants. Experimental data was gathered of the mechanical dry-loosening and segregation technologies, e.g. of milling, crushing and chopping, for different parts of spring-harvested reed canary grass. The applicability of each processing method for loosening different parts of the plant were investigated on the basis of the particle sizes of the processing products, and on the basis of the properties, e.g. the ash content, of the fractions. Air-separation research for processed material was carried out using impact-separator. Especially the chopped material was examined as a function of the length of the chips by making sieving and air-separation tests. Technologies of drumming and chafing between flexible rollers were studied as alternatives for further processing of the chopped material, the aim of which was to find methods which do not crush and grind the straw unnecessarily. The suggestion for the basic elements of the mechanical, as simple segregation method as possible, are the processing phase based on chafing, and the air-separation supplemented with sieving. Depending on the quality requirements of the pulp, no additional mechanical processing might not be needed. Sometimes the chopping can be the only processing phase needed. Because of this the fractionation unit has to be flexible and adjustable with the quality requirements of the pulp

  3. Sunray project - A long-term, nationwide educational process

    International Nuclear Information System (INIS)

    Nikula, Anneli

    2000-01-01

    The Sunray project is a nationwide educational process coordinated by the Economic Information Bureau (TaT Group) for ninth graders in Finnish comprehensive schools. The project aims at giving thorough and versatile information on radiation within the framework of various subjects (physics, biology, domestic science, history, European languages, mother tongue, health education etc.). The Sunray project covers all ninth graders of the existing 600 Finnish comprehensive schools; in all involving some 65 000 pupils. The project, which has been repeated five times, was initiated as part of the European Science and Technology week in 1995. During the first two years it was strongly linked with the science week as natural sciences were seen as a good framework for the chosen perspective. Since 1997, the project has been run as an event in its own right. The project has applied the method of processing integrated groups of themes, which is an objective of the comprehensive school system and the experimental method of science. As schools make their own decisions about the educational programmes to be adopted every semester, the project has been marketed to schools at the beginning of May. The TaT Group has arranged marketing events in some 10 localities in Finland. The Economic Information Bureau of Finland coordinates the project and in 1995-2000 the Radiation and Nuclear Safety Authority (STUK), the Finnish Energy Industries' Federation, the Finnish Electricity Association, Fortum Oyj and Teollisuuden Voima Oy have participated in the project

  4. Summary report of the experiences from TVO's site investigations

    International Nuclear Information System (INIS)

    Oehberg, A.; Saksa, P.; Ahokas, H.; Ruotsalainen, P.; Snellman, M.

    1994-05-01

    Teollisuuden Voima Oy (TVO) has completed preliminary site investigations at five sites in Finland. At the end of 1992 TVO presented the final report to the authorities. The preliminary site investigation phase 1986-1992 was conducted according to the investigation programme compiled by TVO. The aim of this report was to compile a report on experiences from TVOs site investigations. The main interest was focused on investigation strategies and the most important investigation methods for the conceptual modelling. The objective of the preliminary site investigations was to obtain data on the bedrock properties in order to evaluate the areas. The programme was divided into four stages, each stage having its own sub-objective. The site-specific investigation programme for each site included a large common part and a small site-specific part. The strategies (objectives) and experiences from different disciplines, geology, hydrogeochemistry, geophysics and geohydrology, are presented in the report. The conceptual modelling work procedure including both bedrock and groundwater modelling is described briefly using the Olkiluoto site as an example. Each of the other areas has undergone similar phases of work. The uncertainties associated with conceptual modelling are also discussed. The usefulness of the investigation strategy and the investigation methods for conceptual modelling is discussed in the report. Some new equipment, methods or enhancements that have not yet been used in TVOs site investigations have become new tools in site characterisation and are briefly presented in the report. 52 refs, 35 figs, 1 tab

  5. Final disposal of spent fuel in the Finnish bedrock

    International Nuclear Information System (INIS)

    1992-12-01

    Teollisuuden Voima Oy (TVO) is preparing for the final disposal of spent nuclear fuel from the Olkiluoto nuclear power plant (TVO-I and TVO-II reactors). According to present estimates, a total of 1840 tU of spent fuel will be accumulated during the 40-year lifetime of the power plant. An interim storage facility for spent fuel (TVO-KPA Store) has operated at Olkiluoto since 1987. The spent fuel will be held in storage for several decades before it is shipped to the repository site. Both train and road transportation are possible. The spent fuel will be encapsulated in composite copper and steel canisters (ACP Canister) in a facility that will be build above the ground on the site where the repository is located. The repository will be constructed at the depth of several hundreds of meters in the bedrock. In 1987 five areas were selected for preliminary site investigations. The safety analysis (TVO-92) that was carried out shows that the proposed safety criteria would be met at each of the candidate sites. In future expected conditions there would never be significant releases of radioactive substances to the biosphere. The site investigations will be continued in the period 1993 to 2000. In parallel, a R and D programme will be devoted to the safety and technology of final disposal. The site for final disposal will be selected in the year 2000 with the aim of having the capability to start the disposal operations in 2020

  6. Threats and benefits updated information on local opinions regarding the spent nuclear fuel repository in Finland - 16128

    International Nuclear Information System (INIS)

    Kojo, Matti; Kari, Mika; Litmanen, Tapio

    2009-01-01

    The aim of the paper is to provide updated information on local opinion regarding the siting of a spent nuclear fuel repository in Finland. The main question is how the residents of the municipality perceive the threats and benefits of the repository. In accordance with the Decision in Principle by the Council of State passed in 2000, the Olkiluoto area in Municipality of Eurajoki was chosen as the location for the repository to accommodate spent nuclear fuel produced in Finland. Updated information on local opinions is needed as the siting process is approaching the next phase, the application for a construction license by 2012. The nuclear waste management company Posiva, owned by the utilities Teollisuuden Voima and Fortum Power and Heat, has also applied for a new Decision in Principle (DiP) for expansion of the repository. The data provided in this paper is based on a survey carried out in June 2008. The respondents were selected from the residents of the municipality of Eurajoki and the neighbouring municipalities using stratified random sampling (N=3000). The response rate of the survey was 20% (N=606). The paper is part of a joint research project between the University of Jyvaeskylae and the University of Tampere. The research project 'Follow-up research regarding socio-economic effects and communication of final disposal facility of spent nuclear fuel in Eurajoki and its neighbouring municipalities' is funded by the Finnish Research Programme on Nuclear Waste Management (KYT2010). (authors)

  7. Bedrock model of the Romuvaara area

    International Nuclear Information System (INIS)

    Saksa, P.; Paananen, M.; Paulamaeki, S.; Anttila, P.; Pitkaenen, P.; Front, K.; Vaittinen, T.

    1992-05-01

    Site for the final disposal of the spent nuclear fuel investigations implemented in accordance with the research programme drawn up by Teollisuuden Voima Oy were carried out at Romuvaara, Kuhmo, in 1987 - 1991. Model of the site were compiled and used for describing the rock types, fractures, fracturing structures and geohydrological conditions, the main emphasis being on the examination of the bedrock fracturing and related hydraulic conductivity. Three-dimensional models were used for the classification of the various properties of the bedrock structures. The descriptive models were gathered together in a computerized system to facilitate illustration and strage. The rock types at Romuvaara are gneiss, mica gneiss, leucotonalite gneiss, amphibolite, granodiorite and metadiabase. The structural model for fracturing at the site contains 19 zones described in terms of a number of properties. The fracturing observed at Romuvaara ranges from local occurences of dence fracturing to significant, altered fracture zones. The structural model includes deduced values for hydraulic conductivity, deduced points of flow in the boreholes and measured hydraulic heads.Various classifications were used for assessment of hydraulic conductivity in the zones and solid bedrock, and in both cases conductivity was found to diminish with depth. Measured hydraulic heads were mostly found to support structural interpretation. The results were used for estimation of a three-dimensional hydraulic head distribution. Results from pumping tests carried out in the significant flow zone support the geometric interpretation

  8. In-situ experiments to investigate rock matrix retention properties in ONKALO, Olkiluoto, Finland

    Energy Technology Data Exchange (ETDEWEB)

    Voutilainen, Mikko; Helariutta, Kerttuli [Helsinki Univ. (Finland). Dept. of Chemistry; Poteri, Antti [Technical Research Centre of Finland VTT (Finland); and others

    2015-07-01

    Spent nuclear fuel from nuclear power plants, owned by TVO (Teollisuuden Voima Oy) and Fortum, is planned to be disposed to a repository at a depth of more than 400 meters in the bedrock of Olkiluoto (Eurajoki, Finland). The repository system of multiple release barriers consists of both manmade and natural barriers. The surrounding rock acts as the last barrier if other barriers fail during passage of the millennia. Therefore, safe disposal of spent nuclear fuel requires information on the radionuclide transport and retention properties within the porous and water-containing rock matrix along the water conducting flow paths. To this end, various types of experiments are being performed and planned within ONKALO, the underground rock characterization facility in Olkiluoto, as part of the project @''rock matrix REtention PROperties'' (REPRO). The research site is located at a depth of 420 meters close to the repository site. The aim is to study the diffusion and sorption properties of nuclear compounds in the rock matrix under real in-situ conditions. The first in-situ experiment was performed during 2012 using HTO, Na-22, Cl-36 and I-125 as tracer nuclides. Breakthrough curves show retention and asymptotic behavior that are in-line with those caused by matrix diffusion and sorption were observed in their breakthrough curves. Weak sorption was also observed in the breakthrough curves of Na-22 and I-125.

  9. Finnish experiences on licensing and using of programmable digital systems in nuclear power plants

    International Nuclear Information System (INIS)

    Haapanen, P.; Maskuniitty, M.; Heimburger, H.; Hall, L.E.; Manninen, T.

    1993-01-01

    Finnish utility companies, Imatran Voima Oy (IVO) and Teollisuuden Voima (TVO), and the licensing authority, the Finnish Centre for Radiation and Nuclear Safety (STUK), are preparing for a new nuclear power plant in Finland. Plant vendors are proposing programmable digital automation systems for both the safety-related and the operational I and C (instrumentation and control) systems in this new unit. Also in existing plant units the replacement of certain old analog systems with state-of-the-art digital ones will become necessary in the years to come. Licensing of programmable systems for safety critical applications requires a new approach due to the special properties and failure modes of these systems. The major difficulties seem to be in the assessment and quantification of software reliability. The Technical Research Centre of Finland has in co-operation with the authority and the utilities conducted a project (AJA) to develop domestically applicable licensing requirements, guidelines and practices. International standards, guidelines and licensing practices have been analyzed in order to specify national licensing requirements. The paper describes and discusses the findings and experiences of the AJA project so far. The experience in introducing advanced programmable digital control and computer systems in the operating nuclear power plants will be covered briefly. Although these systems are not safety-related but systems of more general interest regarding nuclear safety, some routines regarding the licensing of safety- related systems have been followed. In these backfitting and replacement projects some experience have been gained in how to license safety-related programmable systems. (Author) 31 refs., 2 figs

  10. Experimental testing of a SAG digital SILT application

    International Nuclear Information System (INIS)

    Haapanen, P.; Maskuniitty, M.; Heikkinen, J.; Korhonen, J.

    1995-10-01

    A prototype dynamic testing harness for programmable automation systems has been specified and implemented at the Technical Research Centre of Finland (VTT). In order to get experience on the methodology and equipment for the testing of systems important to the safety of nuclear power plants, where the safety and reliability requirements often are very high, two different pilot systems have been tested. One system was an ABB Master application, which was loaned for testing from ABB Atom by Teollisuuden Voima Oy (TVO). Another system, loaned from Siemens AG(SAG) by IVO International Oy (IVO), was an application realized with SAG's digital SILT technology. The report describes the testing of the SAG application. The purpose of the testing was not to assess the pilot system, but to get experience in the testing methodology and find out the further development needs and potentials of the test methodology and equipment. The experience show that dynamic testing is one feasible way to get more confidence about the safety and reliability of a programmable system that would be hard to achieve by other means. It also shows that more development of the test harness is still needed, especially concerning the comparison of the obtained test response to the expected response provided by the logical model of the system. Also the user interface of the on-line part of the test harness needs development. Methods for generation of the test cases also need further development eg. for achieving statistical significance for the reliability estimates. (10 refs., 90 figs., 9 tabs.)

  11. Finnish participation in the European utility requirements work

    International Nuclear Information System (INIS)

    Patrakka, E.

    2000-01-01

    The Finnish participation in the EUR process started already in April 1994 when IVO (Imatran Voima Oy presently Fortum Oyj) and TVO (Teollisuuden Voima Oy) were asked to comment EUR Volume 1 and 2 Revision A in April 1994. A formal application for the Finnish membership in the EUR organisation was sent on 20 November 1995, and Finland was accepted as an associated member on the next day. The Finnish representatives in the various EUR bodies were appointed in March 1996, at which time the formal participation in these bodies commenced. On 7 November 1996, EUR Steering Committee approved a full membership of IVO and TVO that are joint EUR members representing Finland together. A major Finnish contribution was made in 1997 when IVO and TVO performed a comparison between the EUR document and YVL guides. The period of the Finnish membership has been characterised by the compilation of EUR Volume 3 subsets, in which process IVO/Fortum and TVO have been actively participating. From the Finnish point of view, the EUR work can also be seen as a part of getting prepared to proceed with a possible new NPP project. The EUR document is a substantial aid when preparing the technical specifications for a NPP bid inquiry. The information received in connection with the detailed assessment work for Volume 3 subsets is very valuable when considering the feasibility of NPP concepts. In addition. the experiences gained in the Volume 3 activities enable to develop even better requirements that are manifested by Revision C of Volumes 1 and 2. (author)

  12. Workshop on iodine aspects of severe accident management. Summary and conclusions

    International Nuclear Information System (INIS)

    2000-03-01

    Following a recommendation of the OECD Workshop on the Chemistry of Iodine in Reactor Safety held in Wuerenlingen (Switzerland) in June 1996 [Summary and Conclusions of the Workshop, Report NEA/CSNI/R(96)7], the CSNI decided to sponsor a Workshop on Iodine Aspects of Severe Accident Management, and their planned or effective implementation. The starting point for this conclusion was the realization that the consolidation of the accumulated iodine chemistry knowledge into accident management guidelines and procedures remained, to a large extent, to be done. The purpose of the meeting was therefore to help build a bridge between iodine research and the application of its results in nuclear power plants, with particular emphasis on severe accident management. Specifically, the Workshop was expected to answer the following questions: - what is the role of iodine in severe accident management? - what are the needs of the utilities? - how can research fulfill these needs? The Workshop was organized in Vantaa (Helsinki), Finland, from 18 to 20 May 1999, in collaboration with Fortum Engineering Ltd. It was attended by forty-six specialists representing fifteen Member countries and the European Commission. Twenty-eight papers were presented. These included four utility papers, representing the views of Electricite de France (EDF), Teollisuuden Voima Oy and Fortum Engineering Ltd (Finland), the Nuclear Energy Institute (USA), and Japanese utilities. The papers were presented in five sessions: - iodine speciation; - organic compound control; - iodine control; - modeling; - iodine management; A sixth session was devoted to a general discussion on iodine management under severe accident conditions. This report summarizes the content of the papers and the conclusions of the workshop

  13. Evaluation of incident analysis practices in the Finnish nuclear power industry

    Energy Technology Data Exchange (ETDEWEB)

    Kettunen, J.; Laakso, K

    1999-12-01

    This report provides an analysis and evaluation of incident analysis methods and practices applied by the Finnish regulator Radiation and Nuclear Safety Authority (STUK) and the two Finnish nuclear power plant operators Teollisuuden Voima Oy (TVO) and Fortum Power and Heat Oy (Fortum). The study was conducted in 1998-99. The research material was based on tape-recorded interviews as well as internal directions and event investigation reports provided by the three participating organisations. A framework for analysis and evaluation was developed as part of the study on the basis of referenced root cause analysis and operating experience review methods, selected (foreign) inspection reports, scientific papers and research literature. Well-known inspection methods and principles, such as ASSET and MTO/HPES, provided important guidance to this work. This study shows that although all the evaluated organisations had rather comprehensive incident analysis arrangements, more focus and priorisation is needed. Deficiencies were identified mostly in the areas of recording, assessment and classification of new events and observations, use of existing operating experience data, utilisation of information technology based tools, and allocation of work and resources. In general the direct causes of identified events can be detected and removed, but more emphasis should be given to the prevention of recurrence. This requires a more efficient feedback loop that can be created and maintained by focusing on the root causes of significant events, tasks and activities in which the originating errors occurred, and weaknesses of defensive barriers, and by implementing periodic operational experience reviews. A strategy document for the operating experience feedback process, and firm procedures for the initial assessment of new events and the carrying out of data analyses would help. (orig.)

  14. Regression methodology in groundwater composition estimation with composition predictions for Romuvaara borehole KR10

    Energy Technology Data Exchange (ETDEWEB)

    Luukkonen, A.; Korkealaakso, J.; Pitkaenen, P. [VTT Communities and Infrastructure, Espoo (Finland)

    1997-11-01

    Teollisuuden Voima Oy selected five investigation areas for preliminary site studies (1987Ae1992). The more detailed site investigation project, launched at the beginning of 1993 and presently supervised by Posiva Oy, is concentrated to three investigation areas. Romuvaara at Kuhmo is one of the present target areas, and the geochemical, structural and hydrological data used in this study are extracted from there. The aim of the study is to develop suitable methods for groundwater composition estimation based on a group of known hydrogeological variables. The input variables used are related to the host type of groundwater, hydrological conditions around the host location, mixing potentials between different types of groundwater, and minerals equilibrated with the groundwater. The output variables are electrical conductivity, Ca, Mg, Mn, Na, K, Fe, Cl, S, HS, SO{sub 4}, alkalinity, {sup 3}H, {sup 14}C, {sup 13}C, Al, Sr, F, Br and I concentrations, and pH of the groundwater. The methodology is to associate the known hydrogeological conditions (i.e. input variables), with the known water compositions (output variables), and to evaluate mathematical relations between these groups. Output estimations are done with two separate procedures: partial least squares regressions on the principal components of input variables, and by training neural networks with input-output pairs. Coefficients of linear equations and trained networks are optional methods for actual predictions. The quality of output predictions are monitored with confidence limit estimations, evaluated from input variable covariances and output variances, and with charge balance calculations. Groundwater compositions in Romuvaara borehole KR10 are predicted at 10 metre intervals with both prediction methods. 46 refs.

  15. Building a new nuclear power plant in Finland? Studies performed. Annex 2

    International Nuclear Information System (INIS)

    Patrakka, E.

    2002-01-01

    The electricity consumption per capita is high in Finland due to the country's industrial structure and to the climatic conditions. Industry consumes 55% of the electricity in Finland. The demand of electricity is expected to grow at a rate of 1.5% a year until 2010, and further at a yearly rate of 1% until 2015. This will require 3800 MW of new generating capacity by 2015. A recent study indicates that in base-load power production in Finland the generating costs of a nuclear plant are the lowest in comparison with generation using coal, natural gas or peat. The difference to coal would be 9%, to gas 18% and to peat 40%. The target for Finland to reduce greenhouse gas emissions under the EU burden sharing is 0%. In comparison with business as usual scenarios, however, the reduction need is of the magnitude of 20%, one of the hardest in the EU. Finland already has taken into use the methods, which now are considered essential within the EU for reducing the CO 2 releases. Teollisuuden Voima Oy (TVO) submitted on 15 November 2000 to the Council of State an application for a decision in principle concerning the construction of additional nuclear capacity. The submission of the application is reasoned by the shareholders' need for additional electricity. Furthermore, nuclear power, together with renewable energy sources, makes it possible to comply with the Kyoto protocol commitments. The actual investment decision can be made first after a positive decision in principle has been received from the Council of State and the Parliament. The submission of the application was preceded by a number of studies, the contents of which are summarised. (author)

  16. Degradation modelling for the concrete silo in TVO's VLJ repository

    International Nuclear Information System (INIS)

    Alcorn, S.R.; Christian-Frear, T.L.; Wallace, M.

    1991-05-01

    Teollisuuden Voima Oy (TVO) is currendy construcing in Finland an underground repository (the VLJ repository) for storage of low- and intermediate-level radioactive wastes generated at the Olkiluoto (TVO I and TVO II) nuclear power plant. Intermediate level wastes will be emplaced inside a large concrete silo, which is the principal engineered barrier in the repository. The primary objective of the investigation is to develop an estimate of the length of time it will take for the silo to degrade due to interaction with groundwater to the point that it fails to perform as designed. A secondary objective is to develop a methodology to estimate the length of time required for radio nuclides to migrate from the region inside the silo through the silo wall and floor to the accessible environment as a function of cement and concrete properties. Chemical modeling techniques using the codes EQ3NR/EQ6 were employed to model the degradation of the repository concrete due to interaction with groundwater, and porous flow and diffusion modeling approaches were taken to: (1) estimate the time it would take groundwater and ions to travel into and out of the silo concrete, and (2) determine how these travel times change as the concrete degrades. The results of the investigation suggest that the hydraulic conductivity of the concrete will decrease over time because of the considerable net volume increase (net porosity decrease) from the chemical interactions. Therefore, it appears likely, based on the geochemical and mass transport models, that the silo win perform as required for at least its 500-year design life, and possibly much longer

  17. Development and application of a high-temperature sampling probe for burning chamber conditions in fluidized-bed combustion; Korkean laempoetilan naeytteenottosondin kehittaeminen ja soveltaminen leijukerrospolton tulipesaeolosuhteisiin

    Energy Technology Data Exchange (ETDEWEB)

    Larjava, K.; Paerkkae, M. [VTT Chemical Technology, Espoo (Finland); Linna, V. [VTT Energy, Jyvaeskylae (Finland). Environmental Technology

    1997-10-01

    Determination of heavy and alkali metals and other condensing compounds (e.g. chlorides) in combustion chamber conditions is limited by the poor suitability of traditional methods for sampling at high temperatures. IFRF has developed a high-temperature sampling probe for sampling HCN and NH{sub 3}, which has been tested for sampling of NH{sub 3} by Chalmers University of Technology in Sweden. VTT Chemical Technology and Chalmers University of Technology have in their preliminary experiments determined contents of vaporous heavy metals in the combustion chamber of a 12 MW circulating fluidized-bed boiler using this probe. According to the results, the modified probe is suitable for heavy metal determination in combustion chamber. Based on this series of experiments, modification of the probe has been started on the own financing of VTT Chemical Technology and a field measurement was performed in November 1994 to test the present version of the probe. Based on the results of that measurement, the probe has been modified further on as a part of this LIEKKI 2 project. Similar kind of a principle has been applied in the probe which has been developed by VTT Energy during 1994. The probe is built for determination of gas composition of fluidized bed in full-scale boilers. The purpose of this project is to develop and test a sampling probe for fluidized bed combustion. The main advantage of the probe is that condensation losses in sampling due to high temperature gradients can be avoided. Thus, the probe is very suitable for sampling vaporous heavy and alkali metals and other condensing species as well as burning gases and alternatively also solids at high temperatures

  18. Development and application of a high-temperature sampling probe for burning chamber conditions of fluidized-bed combustion; Korkean laempoetilan naeytteenottosondin kehittaeminen ja soveltaminen leijukerrospolton tulipesaeolosuhteisiin

    Energy Technology Data Exchange (ETDEWEB)

    Larjava, K.; Paerkkae, M.; Jormanainen, P.; Roine, J.; Paakkinen, K. [VTT Chemistry, Espoo (Finland); Linna, V. [VTT Energy, Jyvaeskylae (Finland)

    1996-12-01

    A sampling probe for the burning chamber conditions of fluidized-bed combustion will be developed in this project. The probe will be suitable for sampling vaporous heavy and alkali metals and other condensing compounds (e.g. chlorides) as well combustion gases and alternatively also flue gas particles at high temperatures. The knowledge gained with the probe will help understanding, developing and modeling combustion processes and will thus aid the manufacturers of the boilers. (author)

  19. Drillings at Kivetty in Konginkangas

    International Nuclear Information System (INIS)

    Hinkkanen, H.; Oehberg, A.

    1990-05-01

    According to Government's decision in principle Teollisuuden Voima Oy is obliged to make bedrock investigations for the final disposal of the spent fuel produced by its power plant in Olkiluoto. Areas in Kuhmo, Hyrynsalmi, Sievi, Konginkangas and Olkiluoto were selected for the preliminary site investigations to be carried out during years 1987-1992. In Kivetty, Konginkangas the investigation program was started in spring 1988. During years 1988-1989 a deep borehole (1019 m) and 4 about 500 m deep additional boreholes were core drilled in the area. The structure of the holes makes it possible to carry out many investigations in the holes. Various parameters were measured from the flushing water during the drilling. Corelogging included collecting detailed data of fractures and determining the weathering degree and petrographical properties. Rock mechanical properties, uniaxial compressive strength, Young's modulus and Poisson's ratio were measured from core samples. The flushing water needed in the drillings was pumped from 100 m deep borehole wells drilled with down-the-hole method in the vicinity of the borehole. The water was labeled with 2 tracers before use. 30 vertical holes were core drilled down to the depth of 10 m in bedrock with a light drilling unit. Drilling was carried out in order to determine the thickness of the overburden to investigate the geophysical anomaly sources and to support geological mapping in areas covered with overburden. Groundwater hydraulics is one of the main subjects during the preliminary site investigation phase. For that reason 7 multilevel piezometers were installed on the site to monitore hydraulic head in 3 levels in the uppermost part of bedrock. The work consisted of borehole drillings to the depth of 100 m, geophysical borehole loggings and installation of piezometers. In addition about 65 shotholes were drilled for VSP-, tubewave and seismic measurements

  20. Drillings at Syyry in Sievi

    International Nuclear Information System (INIS)

    Hinkkanen, H.; Oehberg, A.

    1990-10-01

    According to Government's decision in principle Teollisuuden Voima Oy is obliged to make bedrock investigations for the final disposal of the spent fuel produced by its power plant in Olkiluoto. Areas in Kuhmo, Hyrynsalmi, Sievi, Konginkangas and Olkiluoto were selected for the preliminary site investigations to be carried out during years 1987-1992. In Syyry, Sievi the investigation program was started in spring 1988. During years 1988-1989 a deep borehole (1022 m) and 4 about 500-700 m deep additional boreholes were core drilled in the area. The structure of the holes makes it possible to carry out many investigations in the holes. Various parameters were measured from the flushing water during the drilling. Corelogging included collecting detailed data of fractures and determining the weathering degree and petrographical properties. Rock mechanical properties, uniaxial compressive strength, Young's modulus and Poisson's ratio were measured from core samples. The flushing water needed in the drillings was pumped from 100 m deep borehole wells drilled with down-the-hole method in the vicinity of the borehole. The water was labeled with 2 tracers before use. 35 vertical holes were core drilled down to the depth of 10-20 m in bedrock with a light drilling unit. Drilling was carried out in order to determine the thickness of the overburden, to investigate the geophysical anomaly sources and to support geological mapping in areas covered with overburden. Groundwater hydraulics is one of the main subjects during the preliminary site investigation phase. For that reason 7 multilevel piezometers were installed on the site to monitore hydraulic head in 3 levels in the uppermost part of bedrock. The work consisted of borehole drillings to the depth of 100 m, geophysical borehole loggings and installation of piezometers. In addition about 85 shotholes were drilled for VSP-, tubewave and seismic measurements

  1. Development and testing of VTT approach to risk-informed in-service inspection methodology. Final report of SAFIR INTELI INPUT Project RI-ISI

    International Nuclear Information System (INIS)

    Cronvall, O.; Maennistoe, I.; Simola, K.

    2007-04-01

    This report summarises the results of a research project on risk-informed in-service inspection (RI-ISI) methodology conducted in the Finnish national nuclear energy research programme SAFIR (2003-2006). The purpose of this work was to increase the accuracy of risk estimates used in RI-ISI analyses of nuclear power plant (NPP) piping systems, and to quantitatively evaluate the effects of different piping inspection strategies on risk. Piping failure occurrences were sampled by using probabilistic fracture mechanics (PFM) analyses. The PFM results for crack growth were used to construct transition matrices for a discrete-time Markov process model, which in turn was applied to examine the effects of various inspection strategies on the failure probabilities and risks. The applicability of the developed quantitative risk matrix approach was examined as a pilot study performed to the Shut-down cooling piping system 321 in NPP unit OL1 of Teollisuuden Voima Oy (TVO). The analysed degradation mechanisms were stress corrosion cracking (SCC) and thermal fatigue induced cracking (in the mixing points). Here a new and rather straightforward approach was developed to model thermal fatigue induced cracking, which degradation mechanism is much more difficult to model than SCC. This study further demonstrated the usefulness of Markov analysis procedure development by VTT in RI-ISI applications. The most important results are the quantified comparisons of different inspections strategies. It was shown in this study that Markov models are useful for this purpose, when combined with PFM analyses. While the numerical results could benefit from further considerations of inspection reliability, this does not affect the feasibility of the method itself. The approach can be used to identify an optimal inspection strategy for achieving a balanced risk profile of piping segments. (orig.)

  2. Applicability of living PSA in NPP modernization

    International Nuclear Information System (INIS)

    Himanen, R.

    1999-01-01

    Recently the utility Teollisuuden Voima Oy (TVO) has modernized the Olkiluoto 1 and 2 nuclear units and increased the net electric power by 18 per cent. Level 2 PSA was performed during the modernization project and the living level 1 PSA was used to support the design of the plant modifications. The plant specific living PSA model was a powerful tool when evaluating modernization alternatives. Successive support of safety management with the PSA model requires, that both the utility and the Regulatory Body understand capability and limitations of the model in details. TVO has prepared an internal procedure that presents in detail the practices and responsibilities concerning living PSA. The procedure is based on general guidelines and requirements on probabilistic safety analysis of nuclear power plants in Finland, released by the Regulatory Body. Living PSA requires that also the procedure for the use of living PSA is living. The recently published USNRC Regulatory Guides on PSA will be taken into account in the next version of the TVO PSA procedure. The PSA Peer Review Certification Process is one way to evaluate the quality of PSA in general, but also to detect the weaknesses of the PSA. However, the Certification Process cover only limited scope of PSA omitting e.g. all other external events except internal floods. This paper gives an overview on the scope of living PSA for Olkiluoto 1 and 2, and presents some examples on the real use of PSA concerning the modernization of the plant. Definition of quantitative dependability requirements for renovated systems is possible, but on the other hand, proving of these targets is in some cases extremely difficult, because of lacking dependability data. The problems are mainly concerned in systems with of programmable logic control. (au)

  3. Assessment of health risks brought about by transportation of spent fuel

    International Nuclear Information System (INIS)

    Suolanen, V.; Lautkaski, R.; Rossi, J.

    1999-03-01

    In the study health risks caused by transportation of spent fuel from Olkiluoto and from Loviisa NPP's to the planned disposal site have been evaluated. The Olkiluoto NPP is owned by Teollisuuden Voima Oy (TVO) and the Loviisa NPP, situated at Haestholmen, by Fortum Power and Heat Oy. According to the base scenario of 40 years use of the current NPP's the total amount of spent fuel will be 1840 tU (TVO) and 860 tU (Fortum). Annually, 110 tU on the average and at most 250 tU will be transported to the disposal site. The considered transportation routes are from Olkiluoto to Haestholmen, from Olkiluoto to Kivetty, from Olkiluoto to Romuvaara, from Haestholmen to Olkiluoto, from Haestholmen to Kivetty and from Haestholmen to Romuvaara. The considered transportation modes are truck, rail or ship, or combinations of these modes. Each transportation route has been divided into homogenised sequences with respect to population density and/or route type. Total amount of analysed route options were 40, some route sequences are overlapping. Radiation exposures to the population along the routes have been calculated in normal, incident and accident situations during transportation. Occupational radiation doses to the personnel have been estimated for normal transportation only. The consequences of normal transportation have been evaluated based on RADTRAN-model, developed by the Sandia National Laboratories. As incidents, stopping of spent fuel transportation for an exceptionally long period of time, and in another case contamination of outer surface of spent fuel cask have been considered. Expected collective doses and health risks of transportation accidents connected to the routes have been calculated with RADTRAN-model. Single hypothetical transport accidents with pessimistic release assumptions have been further analysed in more detail with the ARANO-model, developed by VTT (Technical Research Centre of Finland). (orig.)

  4. Drilling of deep boreholes and associated geological investigations. Final disposal of spent fuel

    International Nuclear Information System (INIS)

    Anttila, P.

    1983-12-01

    Teollisuuden Voima Oy (Industrial Power Company Ltd.) will take precautions for the final disposal of spent fuel in the Finnish bedrock. The first stage of the site selection studies includes drilling of a deep borehole down to approximately 1000 metres in the winter of 1984. The choice of drilling method and equipment depends on the geological circumstances and the target of the investigation. The most common drilling methods used with the investigations of nuclear waste disposal are diamond core drilling and percussion drilling. The Precambrian bedrock outcropping in Finland exists also in Sweden and Canada, where deep boreholes have been done down to more than 1000 metres using diamond core drilling. This method can be also used in Finland and equipment for the drilling are available. One of the main targets of the investigation is to clarify the true strike and dip of fractures and other discontinuities. The methods used abroad are taking of oriented cores, borehole television survey and geophysical measurements. TV-survey and geophysical methods seem to be most favourable in deep boreholes. Also the accurate position (inclination, bearing) of the borehole is essential to know and many techniques are used for measuring of it. Investigations performed on the core samples include core logging and laboratory tests. For the core logging there is no uniform practice concerning the nuclear waste investigations. Different counries use their own classifications. All of these, however, are based on the petrography and fracture properties of the rock samples. Laboratory tests (petrographical and rock mechanical tests) are generally performed according to the recommendations of international standards. The large volumes of data obtained during investigations require computer techniques which allow more comprehensive collection, storage and processing of data. This kind of systems are already used in Sweden and Canada, for instance, and they could be utilize in Finland

  5. Development of bench marking services for energy efficiency and CO{sub 2} emissions in forest industry; Metsaeteollisuuden energiatehokkuutta ja CO{sub 2}-paeaestoejae koskevien benchmarking-palvelujen kehittaeminen

    Energy Technology Data Exchange (ETDEWEB)

    Saarentaus, A. [Poeyry Forest Industry Consulting Oy, Vantaa (Finland)

    2006-12-19

    The goal of the project is to develop energy-efficiency and CO{sub 2} missions related benchmarking services for pulp and paper and mechanical wood working industry. The services make it possible to 1) position individual production plants based on their energy-efficiency and CO{sub 2} missions, 2) offer process phase level information on energy-efficient and low mission process technology, 3) analyse changes in the competitive position both at production plant as well as country level due to changes in CO{sub 2}-allocation and energy procurement. (orig.)

  6. Sampling and sample preparation development for analytical and on-line measurement techniques of process liquids; Naeytteenoton ja kaesittelyn kehittaeminen prosessinesteiden analytiikan ja on-line mittaustekniikan tarpeisiin - MPKT 11

    Energy Technology Data Exchange (ETDEWEB)

    Karttunen, K. [Oulu Univ. (Finland)

    1998-12-31

    Main goal of the research project is to develop sampling and sample handling methods and techniques for pulp and paper industry to be used for analysis and on-line purposes. The research focus specially on the research and development of the classification and separation methods and techniques needed for liquid and colloidal substances as well as in ion analysis. (orig.)

  7. Sampling and sample preparation development for analytical and on-line measurement techniques of process liquids; Naeytteenoton ja kaesittelyn kehittaeminen prosessinesteiden analytiikan ja on-line mittaustekniikan tarpeisiin - MPKT 11

    Energy Technology Data Exchange (ETDEWEB)

    Karttunen, K [Oulu Univ. (Finland)

    1999-12-31

    Main goal of the research project is to develop sampling and sample handling methods and techniques for pulp and paper industry to be used for analysis and on-line purposes. The research focus specially on the research and development of the classification and separation methods and techniques needed for liquid and colloidal substances as well as in ion analysis. (orig.)

  8. Developing harvesting of fuelwood in first thinnings carried out by forest owners in Finland. Final report; Polttopuun korjuun kehittaeminen metsaenomistajien tekemissae ensiharvennuksissa. Bioenergian tutkimusohjelman tutkimusprojektin 108 (1993-1995) loppuraportti

    Energy Technology Data Exchange (ETDEWEB)

    Ryynaenen, S

    1997-12-31

    The objective of the nation-wide Bioenergy Research Programme (1993-98) is to promote the economically profitable use of bioenergy in Finland by means of technical development. The purpose of this Work Efficiency Institute`s project was to promote the small-scale use of fuelwood by developing, in co-operation with the machine manufacturers, wood harvesting technology and methods based on the use of agricultural tractors in first-thinnings. An equipment register and a computation model version for research purposes and for the calculation of the costs of small-scale production of fuel chips and chopped fuelwood was formulated in the course of the project. Field studies were conducted on six new harvesters for mounting onto the hydraulic cranes of agricultural tractors. Fuelwood-chopping machines equipped with feeding devices can be used to double the productivity when compared to conventional machines. Due to the loading imposed by the work, the job of transferring longwood to the machine should be done using a crane. In commercial production of fuelwood, improving the quality of the chopped fuelwood requires further development of the machines used for this purpose. According to the results of the study covering seven agricultural-tractor-mountable chippers, the chip size distributions obtained were good for all timber assortments. Energy entrepreneurship offers the farmer-forest-owner with opportunities for marketing fuelwood harvested from his woodlot, lifting the degree of utilisation the farm`s harvesting equipment, and extra income

  9. Finnish Research Programme on Nuclear Waste Management (KYT). Framework Programme for 2002-2005

    International Nuclear Information System (INIS)

    Rasilainen, K.

    2002-12-01

    The new Finnish research programme on nuclear waste management (KYT) will be conducted in 2002 - 2005. This framework programme describes the starting point, the basic aims and the organisation of the research programme. The starting point of the KYT programme is derived from the present state and future challenges of Finnish nuclear waste management. The research programme is funded mainly by the Ministry of Trade and Industry (KTM), the Radiation and Nuclear Safety Authority (STUK), Posiva Oy, Fortum Oyj, Teollisuuden Voima Oy (TVO), and the National Technology Agency (Tekes). As both regulators and implementors are involved, the research programme concentrates on neutral research topics that must be studied in any case. Methods and tools for experimental and theoretical studies fall in this category. State of the art -reviews on relevant topics also create national know-how. Topics that directly belong to licensing activities of nuclear waste management are excluded from the research programme. KYT carries out technical studies that increase national know-how in the area of nuclear waste management. The aim is to maintain and develop basic expertise needed in the operations derived from the national nuclear waste management plan. The studies have been divided into strategic studies and studies enhancing the long-term safety of spent nuclear fuel disposal. Strategic studies support the overall feasibility of Finnish nuclear waste management. These studies include basic options and overall safety principles related to nuclear fuel cycle and nuclear waste management. In addition, general cost estimates as well as general safety considerations related to transportations, low- and medium level wastes, and decommissioning are included in strategic studies. Studies supporting the long-term safety of spent fuel disposal include issues related to performance assessment methodology, release of radionuclides from the repository, behaviour of bedrock and groundwater

  10. Drillings at Veitsivaara in Hyrynsalmi

    International Nuclear Information System (INIS)

    Hinkkanen, H.; Oehberg, A.

    1990-04-01

    According to Governmen's decision in principle Teollisuuden Voima Oy is obliged to make bedrock investigations for the final disposal of the spent fuel produced by its power plant in Olkiluoto. Areas in Kuhmo, Hyrynsalmi, Sievi, Konginkangas and Olkiluoto were selected for the preliminary site investigations to be carried out during years 1987-1992. In Veitsivaara, Hyrynsalmi the investigation program was started in April 1987. During years 1987-1988 a deep borehole (1002 m) and 4 and 500 m deep additional boreholes were core drilled in the area. Various parameters were measured from the flushing water during the drilling. Corelogging included collecting detailed data of fractures and determining the weathering degree and petrographical properties. Rock mechanical properties, uniaxial compressive strength, Young's modulus and Poisso's ratio were measured from core samples. The flushing water needed in the drillings was pumped from 100 m deep borehole wells drilled with down-the-hole method in the vicinity of the borehole. The water was labeled with 2 tracers before use. About 75 m deep hole was percussion drilled near the borehole KR1. The spreading of the flushing water in the upper part of bedrock and the quality off the ground of the groundwater were studied by taking watersamples from the hole. 30 vertical holes were core drilled down to the depth of 10 m in bedrock with a light drilling unit. Drilling was carried out in order to determine the thickness of the overburden, to investigate the geophysical anomaly sources and to support geological mapping in areas covered with overburden. Groundwater hydraulics is one of the main subjects during the preliminary site investigation phase. For that reason 7 multilevel piezometers were installed on the site to monitore hydraulic head in 3 levels in the uppermost part of bedrock. The work consisted of borehole drillings to the depth of 100 m, geophysical borehole loggings and installation of piezometers. In addition

  11. Most advanced HTP fuel assembly design for EPR

    International Nuclear Information System (INIS)

    Francillon, Eric; Kiehlmann, Horst-Dieter

    2006-01-01

    End 2003, the Finnish electricity utility Teollisuuden Voima Oy (TVO) signed the contract for building an EPR in Olkiluoto (Finland). Mid 2004, the French electricity utility EDF selected an EPR to be built in France. In 2005, Framatome ANP, an AREVA and Siemens company, announced that they will be pursuing a design certification in the U.S. The EPR development is based on the latest PWR product lines of former Framatome (N4) and Siemens Nuklear (Konvoi). As an introductory part, different aspects of the EPR core characteristics connected to fuel assembly design are presented. It includes means of ensuring reactivity control like hybrid AIC/B4C control rod absorbers and gadolinium as burnable absorber integrated in fuel rods, and specific options for in-core instrumentation, such as Aeroball type instrumentation. Then the design requirements for the EPR fuel assembly are presented in term of very high burnup capacity, rod cladding and fuel assembly reliability. Framatome ANP fuel assembly product characteristics meeting these requirements are then described. EPR fuel assembly design characteristics benefit from the experience feedback of the latest fuel assembly products designed within Framatome ANP, leading to resistance to assembly deformation, high fuel rod restraint and prevention of handling hazards. EPR fuel assembly design features the best components composing the cornerstones of the upgraded family of fuel assemblies that FRAMATOME ANP proposes today. This family is based on a set of common characteristics and associated features, which include the HMP grid as bottom end spacer, the MONOBLOC guide tube and the Robust FUELGUARD as lower tie plate, the use of the M5 Alloy, as cladding and structure material. This fully re-crystallized, ternary Zr-Nb-O alloy produces radically improved in-reactor corrosion, very low hydrogen uptake and growth and an excellent creep behavior, which are described there. EPR fuel assembly description also includes fuel rod

  12. Bases for Decisions on Final Disposal in Finland

    International Nuclear Information System (INIS)

    Avolahti, Jaana

    2001-01-01

    The disposal of the spent nuclear fuel is approaching one of the significant milestones in Finland. Social debate on the nuclear waste management is going on aiming at a decision of principle on future directions of spent fuel management. The research so far has required no political decision. This current situation is preceded by preparations for two decades carried out by Posiva Oy who took over the programme managed earlier by Teollisuuden Voinia Oy, one of the country's nuclear power companies. The preparations comprise site investigations, technical concept development, research into long-term safety and an environmental impact assessment. The work carried out by Posiva is under regular assessment by the authorities. Research programmes are drawn up every year and reports are published for open review. The preparations in the next years to come aim at starting the construction of the repository in 2010 and the disposal operations are planned to be started in 2020. Various stakeholders in Finland are involved in the decision-making process on the disposal of spent nuclear fuel. The process started when Posiva as an implementer applied for the Government's Decision in Principle in 1999. The Government made a favourable decision in December 2000 on the basis of different considerations. Among the important bases were the preceding favourable decisions made by the proposed siting municipality and the regulatory authority for radiation safety. At the moment the members of the Parliament are discussing the principles of the disposal in order to be able to vote on the Government's decision in the springtime. This paper discusses similarities and differences between the decisions made so far as regards the deep repository. The objective is to present the significance of the decisions from the point of view of an implementer of the repository. The Decision in Principle does not give any consent to start constructing the repository. Licenses for construction and

  13. Role of PRA in new NPP projects

    International Nuclear Information System (INIS)

    Julin, A.; Sandberg, J.; Virolainen, R.

    2012-01-01

    In Finland, a plant specific, Level 1 and 2 Probabilistic Risk Analysis (PRA) is required as a prerequisite for issuing the construction license and operating license. The use of PRA in various applications and the main insights are presented. These applications include e.g. PRA support to the design of SSCs (Systems, Structures and Components), definition of pre-service and in-service inspection programs, evaluation of the safety classification of SSCs, development of procedures, training and in definition of risk informed technical specifications, periodic testing and on-line preventive maintenance programs. In addition, PRA shall be used to assess the adequacy and coverage of the phase and system commissioning programs. Also the potential risks related to commissioning tests during nuclear test phase, shall be assessed with the help of PRA. In OL3 project, risk informed approach has been applied on a large scale for the first time in the design, construction and commissioning of a new NPP unit. Pre-nuclear commissioning tests have started at OL3 site and the plant is foreseen to begin commercial operation in 2013. Decisions have been made to launch new NPP projects. Teollisuuden Voima Oyj (TVO) is planning to build a new unit (OL4) at Olkiluoto site and a new utility, Fennovoima, is planning to build one unit at one of two alternative green field sites in Northern parts of Finland. Insights from PRAs of operating NPPs have been used in the evaluation of possible new sites to ensure that the site specific concerns and environmental conditions are adequately taken into account in the design of SSCs. Although the seismic activity at the Olkiluoto site is low, a comprehensive seismic risk analysis is being conducted. Its results support the review of the deterministic seismic design. For new sites, a probabilistic seismic hazard analysis has been carried out for the determination of the design earthquake. Experiences from OL3 licensing have been utilized in the

  14. IAEA Mission Sees Safety Commitment at Finland's New Olkiluoto Reactor Before Planned Start in December

    International Nuclear Information System (INIS)

    2018-01-01

    An International Atomic Energy Agency (IAEA) team of experts observed a commitment to safety by the operator of Unit 3 at Finland’s Olkiluoto Nuclear Power Plant, ahead of the Evolutionary Pressurised Water Reactor’s (EPR) planned connection to the grid in December. The team also identified areas for further enhancements as the operator prepares to put the reactor online. The Pre-Operational Safety Review Team (Pre-OSART) concluded an 18-day mission today to assess operational safety at the 1600 MW reactor, located about 280 km northwest of the capital, Helsinki. Finland has engaged France’s Areva SA together with Germany’s Siemens to construct and commission the unit. The operator is Teollisuuden Voima (TVO). Pre-OSART missions aim to improve operational safety by objectively assessing safety performance using the IAEA’s safety standards and proposing recommendations for improvement where appropriate. The review covered the areas of leadership and management for safety; training and qualification; operations; maintenance; technical support; operating experience; radiation protection; chemistry; emergency preparedness and response; accident management; and commissioning. The team identified a number of good practices that will be shared with the nuclear industry globally, including: • The plant has developed and implemented an efficient system for improving knowledge and skills of staff members. • The plant has developed and validated a unique method for performing suspended solids analysis using a microscope, imaging software and a digital camera. • The plant has introduced a system for systematically assessing nuclear safety culture in the plant supplier organization during construction and commissioning. The mission made several recommendations to improve operational safety, including: • Plant management should set appropriate expectations, communicate them to staff and reinforce them in the field. • The plant should improve the

  15. Rock mechanical, thermomechanical and hydraulic behaviour of the near field for spent nuclear fuel

    International Nuclear Information System (INIS)

    Johansson, E.; Hakala, M.; Lorig, L.J.

    1991-10-01

    Teollisuuden Voima Oy (TVO) is investigating the feasibility of disposing high level nuclear waste in crystalline rock at depths of 400 to 600 meters below the ground surface. Two explicit distinct element computer codes UDEC and 3DEC were used to simulate the mechanical response associated with excavation and the thermomechanical response associated with waste emplacement. Model input data are mostly based on preliminary design of the repository and on field data from on-going site investigations in Finland. The results showed that the overall stability of the repository near-field appears to be good during the studied time period 0 - 900 years. The maximum displacements after excavation are about 2 mm on the walls of the disposal tunnel. Joint openings are only a few micrometers. The hydraulic conductivity increases by 4 to 6 times within the zone of 0,3 m around the tunnel and emplacement hole, and farther away the average increase in conductivity is 1,2 to 1,7 times. After 60 years the heating increases the stresses in the vicinity of the excavated rooms, and closes the joints decreasing the hydraulic conductivity by 93 - 99 % when assuming 10 μm in-situ hydraulic aperture. However, when assuming 50 μm in-situ hydraulic aperture the hydraulic conductivity increases 10 - 40 % because the change in dynamic viscosity of water has a larger effect than the joint aperture change. After 900 years in the cooling stage the stresses and displacements come back almost to the same level as after the excavation. Some permanent displacements remain in the joints due to the shearing. The hydraulic conductivity at 900 years is 10 - 70 % of the conductivity after the excavation. The comparisons between the 2-D and 3-D results show that the two-dimensional modeling, if sufficient cross-sections have been analyzed, is enough to describe mechanical behaviour of the near-field, whereas the three-dimensional modeling is needed in some cases to assess the thermomechanical behaviour

  16. SAFIR. The Finnish research programme on nuclear power plant safety 2003-2006. Executive summary

    International Nuclear Information System (INIS)

    Puska, E.

    2006-12-01

    Major part of Finnish public research on nuclear power plant safety during the years 2003-2006 has been carried out in the SAFIR programme. The programme has been administrated by the steering group that was nominated by the Ministry of Trade and Industry (KTM). The steering group of SAFIR has consisted of representatives from Radiation and Nuclear Safety Authority (STUK), Ministry of Trade and Industry (KTM), Technical Research Centre of Finland (VTT), Teollisuuden Voima Oy (TVO), Fortum Power and Heat Oy, Fortum Nuclear Services Oy (Fortum), Finnish Funding Agency for Technology and Innovation (Tekes), Helsinki University of Technology (TKK) and Lappeenranta University of Technology (LTY). The key research areas of SAFIR have been (1) reactor fuel and core, (2) reactor circuit and structural safety, (3) containment and process safety functions, that was divided in 2005 into (3a) thermal hydraulics and (3b) severe accidents, (4) automation, control room and IT, (5) organisations and safety management and (6) risk-informed safety management. The research programme has included annually from 20 up to 24 research projects, whose volume has varied from a few person months to several person years. The total volume of the programme during the four year period 2003-2006 has been 19.7 million euros and 148 person years. The research in the programme has been carried out primarily by Technical Research Centre of Finland (VTT). Other research units responsible for the projects include Lappeenranta University of Technology, Fortum Nuclear Services Oy, Helsinki University of Technology and RAMSE Consulting Oy. In addition, there have been a few minor subcontractors in some projects. The programme management structure has consisted of the steering group, a reference group in each of the seven research areas and a number of ad hoc groups in the various research areas. This report gives a short summary of the results of the SAFIR programme for the period January 2003 - November

  17. Maintaining staff competence-a NPP operator viewpoint

    International Nuclear Information System (INIS)

    Patrakka, E.

    2000-01-01

    For a nuclear power plant operator, it is crucial to guarantee the safe and economic operation of the power plant as well as to look after the general acceptability of nuclear power. As to human resources management, this requires continuous maintenance and enhancement of the performance of the individuals and organisation. To this end, several development projects have recently been implemented by Teollisuuden Voima Oy (TVO) at the Olkiluoto nuclear power plant, which consists of twin 840 MWe BWR units that commenced their operation in 1978 and 1980. Systematic initial and continuing training programmes are needed to maintain the technical and managerial skills and know-how at a high level. The present stabile state of nuclear power, i.e. operation of ageing plants with personnel ageing as well, requires a variety of actions to reinforce the training efforts. At Olkiluoto NPP, we have carried out an extensive modernization programme that allowed the personnel to strengthen their knowledge and supplement it with the most recent results of development. We have also closely monitored the NPP development projects of the vendors, which has added to the preservation of know-how and understanding of advanced nuclear power technology. We have close contacts to the research institutes and universities, and have performed R and D activities to limited extent. In addition to the projects mentioned above, a co-ordinated development programme, 'TVO 2002', was initiated last year. The main objective of this programme is to ensure the functional preconditions and the competitiveness of the company in a changing environment. The management and operational procedures will be developed in such a way that the goals set for year 2002 will be achieved. The programme is organised as ten projects, which cover a variety of development subjects. One of the focal areas includes projects that can be characterised with the words 'Survey of competencies' and 'Preservation of know

  18. Development of selective catalytic oxidation (SCO) for NH{sub 3} and HCN removal from gasification gas; Selektiivisen katalyyttisen hapetusprosessin (SCO) kehittaeminen kaasutuskaasun NH{sub 3}:n ja HCN:n poistoon

    Energy Technology Data Exchange (ETDEWEB)

    Leppaelahti, J.; Koljonen, T.; Heiskanen, K. [VTT Energy, Espoo (Finland)

    1997-10-01

    In gasification, reactive nitrogen compounds (mainly NH{sub 3} and HCN) are formed from fuel nitrogen. If the gas containing NH{sub 3} is burned, a high NO{sub x} emission may be formed. The content of nitrogen compounds of the hot gasification gas could be reduced in Selective Catalytic Oxidation (SCO) process. In this process small amounts of reactive oxidisers are injected into the gas in order to convert NH{sub 3} to N{sub 2}. The utilization of SCO process together with low NO{sub x} burners in advanced gasification power stations might offer an alternative for flue gas treatment technologies like SCR (Selective Catalytic Reduction). In the earlier research, conditions were found, where oxidizers reacted selectively with ammonia in the gasification gas. Highest ammonia reduction took place in the aluminium oxide bed in the presence of NO and O{sub 2}. The aim of this study is to examine the reaction mechanism in order to be able to further evaluate the development possibilities of this kind process. The effect of composition and the amount of added oxidizer, the content of combustible gas components, space velocity, pressure and temperature will be studied. The experiments are carried out with the laboratory scale high pressure flow reactor of VTT Energy. Kinetic modelling of the experimental results is carried out in co-operation with the combustion chemistry group of Aabo Akademi. The aim of the modelling work is to bring insight to the gas-phase reactions that are important for the SCO-process. (orig.)

  19. Comparison of the Finnish and German Forest Industry: Computerized Performance Analysis Based on Public Communication and Optimized Neural Network Tool (SOM), Suomen ja Saksan metsäteollisuuden vertailu: Tietokonepohjainen suoritusanalyysi yrityksen viestinnän ja optimoidun neuroverkkomallin avulla

    OpenAIRE

    Kordelin, Toni Juha

    2016-01-01

    Tietokoneiden ja tietotekniikan merkitys on kasvanut merkittävästi Internetin yleistymisen myötä. Se on vaikuttanut olennaisesti kommunikointiin ja liiketoiminnan harjoittamiseen. Tätä teknologia ei kuitenkaan pitäisi rajoittaa myynti- ja ostotoimintaan, vaan hyödyntää myös tutkimus- ja liiketoimintatyökaluna ja laajana tietolähteenä. Tässä tutkimuksessa verrataan Suomen sekä Saksan saha- ja paperiteollisuuden suorituskykyä julkisen viestinnän avulla. Metsäsektorilla on perinteisesti ollut...

  20. Geological and geophysical investigations in the selection and characterization of the disposal site for high-level nuclear waste in Finland

    Energy Technology Data Exchange (ETDEWEB)

    Paulamaki, S.; Paananen, M.; Kuivamaki, A. [Geological Survey of Finland, Espoo (Finland); Wikstrom, L. [Posiva Oy, Olkiluoto (Finland)], e-mail: seppo.paulamaki@gtk.fi

    2011-07-01

    Two power companies, Teollisuuden Voima Oy (TVO) and Fortum Power and Heat Oy, are preparing for the final disposal of spent nuclear fuel deep in the Finnish bedrock. In the initial phase of the site selection process in the late 1970s and early 1980s, the Geological Survey of Finland (GTK) examined the general bedrock factors that would have to be taken into account in connection with final disposal with reference to the international guidelines adapted to Finnish conditions. On the basis of extensive basic research data, it was concluded that it is possible to find a potential disposal site that fulfils the geological safety criteria. In the subsequent site selection survey covering the whole of Finland, carried out by GTK in 1983-1985, 101 potential investigation areas were discovered. Eventually, five areas were selected by TVO for preliminary site investigations: Romuvaara and Veitsivaara in the Archaean basement complex, Kivetty and Syyry in the Proterozoic granitoid area, and Olkiluoto (TVO's NPP site) in the Proterozoic migmatite area. The preliminary site investigations at the selected sites in 1987-1992 comprised deep drillings together with geological, geophysical, hydrogeological and hydrogeochemical investigations. A conceptual geological bedrock model was constructed for each site, including lithology, fracturing, fracture zones and hydrogeological conditions. On the basis of preliminary site investigations, TVO selected Romuvaara, Kivetty and Olkiluoto for detailed site investigations to be carried out during 1993-2000. After the feasibility studies, the island of Haestholmen, where Fortum's Loviisa nuclear power plant is located, was added to the list of potential disposal sites. In the detailed site investigations, additional data on bedrock were gathered, the previous conceptual geological, hydrogeological and hydrogeochemical models were complemented, the rock mechanical properties of the bedrock were examined, and the constructability

  1. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    Energy Technology Data Exchange (ETDEWEB)

    Kosonen, M.; Hakola, M. [Teollisuuden Voima Oyj, F- 27160 Eurajoki (Finland)

    2012-07-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the

  2. Results of monitoring at Olkiluoto in 2009. Environment

    Energy Technology Data Exchange (ETDEWEB)

    Haapanen, A. (ed.) (Haapanen Forest Consulting, Vanhakylae (Finland))

    2010-10-15

    This Working Report presents the main results of Posiva Oy's environmental monitoring programme on Olkiluoto Island in 2009. These summary reports have been published since 2005. The environmental monitoring system supervised by Posiva Oy produces input for biosphere modelling for long-term safety purposes as well as for monitoring the state of the environment during the construction (and later operation) of ONKALO underground characterization facility. Part of the monitoring is performed by the company running the nuclear power plants on the island, Teollisuuden Voima Oy (TVO). Monitoring has been carried out for varying periods of time depending on the sector: some monitoring activities performed by TVO originate from the 1970s and the repository-related environmental monitoring of Olkiluoto from the early 2000s. The monitoring programme evolves according to the experiences gained from the modelling work and an increased understanding of the site. Augmentations in 2009 include e.g. establishment of a new forest intensive monitoring plot (FIP14), continuation of studies on fine roots and on the species composition and abundances of small mammals. Line transect samplings of ants, terrestrial snails and earthworms were carried out and a systematic monitoring of island birds was started. In addition, a project was started where the sediment load and factors affecting the sediment transportation into Eurajoensalmi bay is examined. Dust produced during construction of the third nuclear power unit (OL3), ONKALO and related infrastructure can be seen in the soil solution and deposition results. Furthermore, the construction works and road traffic have a raising effect on the noise levels of the immediate surroundings. The land-use continues to change, but the remaining natural environment resembles other coastal locations. The young age of the soils and the closeness of the sea are reflected in the soil properties. Mammalian fauna on the island is typical of coastal

  3. Results of monitoring at Olkiluoto in 2009. Environment

    International Nuclear Information System (INIS)

    Haapanen, A.

    2010-10-01

    This Working Report presents the main results of Posiva Oy's environmental monitoring programme on Olkiluoto Island in 2009. These summary reports have been published since 2005. The environmental monitoring system supervised by Posiva Oy produces input for biosphere modelling for long-term safety purposes as well as for monitoring the state of the environment during the construction (and later operation) of ONKALO underground characterization facility. Part of the monitoring is performed by the company running the nuclear power plants on the island, Teollisuuden Voima Oy (TVO). Monitoring has been carried out for varying periods of time depending on the sector: some monitoring activities performed by TVO originate from the 1970s and the repository-related environmental monitoring of Olkiluoto from the early 2000s. The monitoring programme evolves according to the experiences gained from the modelling work and an increased understanding of the site. Augmentations in 2009 include e.g. establishment of a new forest intensive monitoring plot (FIP14), continuation of studies on fine roots and on the species composition and abundances of small mammals. Line transect samplings of ants, terrestrial snails and earthworms were carried out and a systematic monitoring of island birds was started. In addition, a project was started where the sediment load and factors affecting the sediment transportation into Eurajoensalmi bay is examined. Dust produced during construction of the third nuclear power unit (OL3), ONKALO and related infrastructure can be seen in the soil solution and deposition results. Furthermore, the construction works and road traffic have a raising effect on the noise levels of the immediate surroundings. The land-use continues to change, but the remaining natural environment resembles other coastal locations. The young age of the soils and the closeness of the sea are reflected in the soil properties. Mammalian fauna on the island is typical of coastal

  4. Geological and geophysical investigations in the selection and characterization of the disposal site for high-level nuclear waste in Finland

    Energy Technology Data Exchange (ETDEWEB)

    Paulamaki, S; Paananen, M; Kuivamaki, A [Geological Survey of Finland, Espoo (Finland); Wikstrom, L. [Posiva Oy, Olkiluoto (Finland)], e-mail: seppo.paulamaki@gtk.fi

    2011-07-01

    Two power companies, Teollisuuden Voima Oy (TVO) and Fortum Power and Heat Oy, are preparing for the final disposal of spent nuclear fuel deep in the Finnish bedrock. In the initial phase of the site selection process in the late 1970s and early 1980s, the Geological Survey of Finland (GTK) examined the general bedrock factors that would have to be taken into account in connection with final disposal with reference to the international guidelines adapted to Finnish conditions. On the basis of extensive basic research data, it was concluded that it is possible to find a potential disposal site that fulfils the geological safety criteria. In the subsequent site selection survey covering the whole of Finland, carried out by GTK in 1983-1985, 101 potential investigation areas were discovered. Eventually, five areas were selected by TVO for preliminary site investigations: Romuvaara and Veitsivaara in the Archaean basement complex, Kivetty and Syyry in the Proterozoic granitoid area, and Olkiluoto (TVO's NPP site) in the Proterozoic migmatite area. The preliminary site investigations at the selected sites in 1987-1992 comprised deep drillings together with geological, geophysical, hydrogeological and hydrogeochemical investigations. A conceptual geological bedrock model was constructed for each site, including lithology, fracturing, fracture zones and hydrogeological conditions. On the basis of preliminary site investigations, TVO selected Romuvaara, Kivetty and Olkiluoto for detailed site investigations to be carried out during 1993-2000. After the feasibility studies, the island of Haestholmen, where Fortum's Loviisa nuclear power plant is located, was added to the list of potential disposal sites. In the detailed site investigations, additional data on bedrock were gathered, the previous conceptual geological, hydrogeological and hydrogeochemical models were complemented, the rock mechanical properties of the bedrock were examined, and the constructability and the

  5. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    International Nuclear Information System (INIS)

    Kosonen, M.; Hakola, M.

    2012-01-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the

  6. Site specific information in site selection

    International Nuclear Information System (INIS)

    Aeikaes, T.; Hautojaervi, A.

    1998-01-01

    The programme for the siting of a deep repository for final disposal of spent nuclear fuel was started already in 1983 and is carried out today by Posiva Oy which continues the work started by Teollisuuden Voima Oy. The programme aims at site selection by the end of the year 2000. The programme has progressed in successive interim stages with defined goals. After an early phase for site identification, five sites were selected in 1987 for preliminary site characterisation. Three of these were selected and judged to be best suited for the more detailed characterisation in 1992. An additional new site was included into the programme based on a separate feasibility study in the beginning of 1997. Since the year 1983 several safety assessments together with technical plans of the facility have been completed. When approaching the site selection the needs for more detailed consideration of the site specific properties in the safety assessment have been increased. The Finnish regulator STUK has published a proposal for general safety requirements for the final disposal of spent nuclear fuel in Finland. This set of requirements has been projected to be used in conjunction of the decision making by the end 2000. Based on the site evaluation all sites can provide a stable environment and there is evidence that the requirements for the longevity of the canister can be fulfilled at each site. In this manner the four candidate sites do not differ too much from each other. The main difference between the sites is in the salinity of the deep groundwater. The significance of differences in the salinity for the long-term safety cannot be defined yet. The differences may contribute to the discussion of the longevity of the bentonite buffer and also to the modelling of the groundwater flow and transport. The use of the geosphere as a transport barrier is basically culminated on the questions about sparse but fast flow routes and 'how bad channeling can be'. To answer these questions

  7. Communications highlights of the Finnish nuclear industry in 1997

    International Nuclear Information System (INIS)

    Heininen-Ojanperae, Marke

    1998-01-01

    Full text: The Poster will contain two major issues i.e. description of the information Centre Renovation Project at Loviisa Power Plant and a presentation with material of the Sunray III Project. The Sunray Project: The Sunray Project is a national radiation project intended for all ninth graders in the Finnish school system. The project started two years ago. Attention has been focused on the topic of radiation. The topic has been dealt with in connection with different subject as history, English, Swedish, French, Finnish, mathematics, physics, chemistry, geography, health and home economics, as well as vocational counselling. The aim of the project is to provide extensive information on the subject of radiation and radioactivity, to investigate benefits and disadvantages and to help pupils understand units and see things in correct proportions. Sunray I focused on radon, Sunray II on light. Sunray III will start this autumn and its main theme will be risk perception. The programme of the Sunray III is structured as follows: Part One: Articles on risk provided by experts from different fields. Part Two: A risk management game Part Three: A special view on natural radiation. The project is coordinated by Economic Information Bureau in cooperation with the Finnish Centre for Radiation and Nuclear Safety and two major power companies Imatran Voima and Teollisuuden Voima. The coordinator of the Sunray III Project is Mr. Matti Lattu. The Information Centre Renovation Project (ICRP) The ICRP has been a two-year project which was completed for the 20th anniversary celebration of Loviisa Nuclear Power Plant in February 1997. The main emphasis was to harness the local natural environment as much as possible. The focal point of the project was presented by a new, large-sized map as a water-colour painting (a printed version), a bird-eye view of the Haestholinen Island environment. The information signs system was completely renewed. A large sea-water aquarium containing

  8. Results of monitoring at Olkiluoto in 2012. Environment

    International Nuclear Information System (INIS)

    Haapanen, A.

    2014-04-01

    In 2003, Posiva Oy presented a programme for monitoring at Olkiluoto during construction and operation of ONKALO. In 2012 the monitoring programme was updated to concern the years 2012-2018. Part of the monitoring is performed by the company running the nuclear power plants on the island, Teollisuuden Voima Oy (TVO). This Working Report presents the main results of Posiva's environmental monitoring programme on Olkiluoto Island in 2012. Results are presented under five topics: 1. Evolution of geosphere, 2. Biosphere modelling input data, 3. Interaction between surface environment and groundwater in bedrock, 4. Environmental impact and 5. Baseline of monitoring of radioactive releases. Concerning the evolution of geosphere, LIDAR-scannings were done in the Olkiluoto area in 2012. The acquired data can be used for elevation and other modelling purposes. The soil solution quality in 2012 was quite comparable to that in earlier years. Proximity of the sea and the young age of soils are seen in soil solution results. Biosphere modelling input data in 2012 included e.g. continuous tree litterfall and transpiration data, as well as updated game statistics and population estimates of fauna, a fishery survey from the River Eurajoki (2011) and basic monitoring data from Olkiluoto offshore properties. Interaction between surface environment and groundwater in bedrock includes e.g. weather and surface water monitoring data. Environmental impact analyses included e.g. monitoring of noise, air quality, effluent waters and private drilled wells. Noise monitoring in the vicinity of ONKALO showed that in the case of raised noise levels the sources are mainly the traffic on Olkiluodontie road, the air conditioning of ONKALO and occasional sources such as springtime bird sounds. Construction activities in the area were seen in increased amount of NO 3 -N in the bulk deposition, and Al and Fe accumulating on needle surfaces in areas close to the rock piling and crushing area. Scots

  9. Results of monitoring at Olkiluoto in 2010 - Environment

    Energy Technology Data Exchange (ETDEWEB)

    Haapanen, A. (ed.) [Haapanen Forest Consulting, Vanhakylae (Finland)

    2011-10-15

    This Working Report presents the main results of Posiva Oy's environmental monitoring programme on Olkiluoto Island in 2010. These summary reports have been published since 2005. The environmental monitoring system supervised by Posiva Oy produces input for biosphere modelling for long-term safety purposes as well as for monitoring the state of the environment during the construction (and later operation) of ONKALO underground rock characterization facility. Part of the monitoring is performed by the company running the nuclear power plants on the island, Teollisuuden Voima Oy (TVO). Monitoring has been carried out for varying periods of time depending on the sector: some monitoring activities performed by TVO originate from the 1970s and the repository-related environmental monitoring of Olkiluoto from the early 2000s. The monitoring programme evolves according to experiences gained from the modelling work and increased understanding of the site. Augmentations in 2010 include one previously unmonitored private drilled well, and sampling of crop plants, aquatic macrophytes, and bottom fauna, as well as soil and water in order to obtain more data on site-specific concentration ratios. In addition to Olkiluoto Island, two so called reference lakes have been included in the sampling. Studies have been going on on one reference mire, as well. Bottom fauna studies of River Eurajoki exist from late 1970s, but have not been presented here before. Dust produced during construction of the third nuclear power unit (OL3), ONKALO and related infrastructure can be seen in the analysis results of needle litter. The construction works and road traffic have a raising effect on the noise levels of the immediate surroundings. The land-use continues to change, but the remaining natural environment resembles other coastal locations. The young age of the soils and the closeness of the sea are reflected in the soil properties. Mammalian fauna on the island is typical of coastal

  10. Hydrogeological modelling for assessment of radionuclide release scenarios for the repository system 2012

    Energy Technology Data Exchange (ETDEWEB)

    Hartley, L.; Hoek, J.; Swan, D.; Appleyard, P.; Baxter, S.; Roberts, D.; Simpson, T. [AMEC (United Kingdom)

    2013-07-15

    Posiva Oy is responsible for implementing the programme for geological disposal of spent nuclear fuel produced by its owners Teollisuuden Voima Oyj (TVO) and Fortum Power and Heat Oy in Finland. Olkiluoto in Eurajoki has been selected as the primary site for the repository, subject to further detailed investigation which is currently focused on the construction of an underground rock characterisation and research facility (the ONKALO). An essential part of the assessment of long-term safety of a repository is the analysis of groundwater flow since it is the only means of transport of radionuclides to the biosphere (besides human intrusion). The analysis of long-term safety for a KBS-3 concept requires as input a description of details of the groundwater flow around and through components of the engineered barrier system as well as details of the groundwater pathway to the biosphere during the current temperate climate period, as well as indications of behaviour under future climate periods such as glacial conditions. This report describes the groundwater flow modelling study performed to provide some of the necessary inputs required by Safety Assessment (i.e. radionuclide transport analysis). Underlying this study is the understanding of the site developed during the site investigations as summarised in the site descriptive model (SDM), and in particular the description of Olkiluoto Hydrogeological DFN model (Hydro-DFN). The main focus of this study is the temperate climate period, i.e. the evolution over the next 10,000 years, but the hydrogeological situation under various glacial climate conditions is also evaluated. Primary outputs of the study are repository performance measures relating to: the distributions of groundwater flow around the deposition holes; deposition tunnels and through the EDZ; flow-related transport resistance along groundwater pathways from the repository to the surface; and their the exit locations. Other analyses consider the

  11. Ecosystem characterization strategy at a repository site - Olkiluoto as a case study

    Energy Technology Data Exchange (ETDEWEB)

    Pere, Tuomas [Posiva Oy, Olkiluoto, 27160 Eurajoki (Finland); Kangasniemi, Ville [Environmental Research and Assessment EnviroCase, Ltd., Hallituskatu 1 D 4, 28100 Pori (Finland); Lahdenperae, Anne-Maj [Saanio and Riekkola Oy, Laulukuja 4, 00420 Helsinki (Finland); Aro, Lasse [Finnish Forest Research Institute, Kaironiementie 15, 39700 Parkano (Finland)

    2014-07-01

    Posiva Oy is constructing an underground research facility ONKALO in Olkiluoto, located in the municipality of Eurajoki, Finland. This is part of the plan for final disposal of spent nuclear fuel produced by Posiva's owners: Teollisuuden Voima Oyj and Fortum Power and Heat Oyj. Posiva has applied for construction license for an underground repository, which is planned to start its operation around the year 2020. The final disposal of high-level radioactive waste poses questions of long-term safety and possible processes of radionuclide release in the EBS (Engineered Barrier System) and the geosphere are also modelled as well as possible transport routes in the bedrock. Posiva has also established a monitoring program for the environment and is also conducting modelling of the surface environment and biosphere in Olkiluoto and the surrounding reference area. These serve the purpose of both, site description and modelling of the transport and accumulation of possible radionuclide releases in the surface environment and biosphere. The process of modelling used by Posiva requires the division of the surface environment and biosphere into several categories. In Posiva's classification, ecosystems are divided to two categories: terrestrial and aquatic with terrestrial divided to forests and agricultural areas. These categories are further divided to ecosystem types which include: lake, river, forest, cropland and sea (with coastal sea as a separate type). These types are even further divided to 14 ecosystem sub-types and behind these sub-types, a total of 24 biotopes exist. Soil and sediment types are also classified to 7 classes. The methodology behind the selection of these biotopes and their connection to the modelling of radionuclide transport in the surface environment is further described in the text. Some of the ecosystem types and biotopes are absent in present-day Olkiluoto area, which necessitates the use of reference targets, such as lakes, rivers

  12. Hydrogeological modelling for assessment of radionuclide release scenarios for the repository system 2012

    International Nuclear Information System (INIS)

    Hartley, L.; Hoek, J.; Swan, D.; Appleyard, P.; Baxter, S.; Roberts, D.; Simpson, T.

    2013-07-01

    Posiva Oy is responsible for implementing the programme for geological disposal of spent nuclear fuel produced by its owners Teollisuuden Voima Oyj (TVO) and Fortum Power and Heat Oy in Finland. Olkiluoto in Eurajoki has been selected as the primary site for the repository, subject to further detailed investigation which is currently focused on the construction of an underground rock characterisation and research facility (the ONKALO). An essential part of the assessment of long-term safety of a repository is the analysis of groundwater flow since it is the only means of transport of radionuclides to the biosphere (besides human intrusion). The analysis of long-term safety for a KBS-3 concept requires as input a description of details of the groundwater flow around and through components of the engineered barrier system as well as details of the groundwater pathway to the biosphere during the current temperate climate period, as well as indications of behaviour under future climate periods such as glacial conditions. This report describes the groundwater flow modelling study performed to provide some of the necessary inputs required by Safety Assessment (i.e. radionuclide transport analysis). Underlying this study is the understanding of the site developed during the site investigations as summarised in the site descriptive model (SDM), and in particular the description of Olkiluoto Hydrogeological DFN model (Hydro-DFN). The main focus of this study is the temperate climate period, i.e. the evolution over the next 10,000 years, but the hydrogeological situation under various glacial climate conditions is also evaluated. Primary outputs of the study are repository performance measures relating to: the distributions of groundwater flow around the deposition holes; deposition tunnels and through the EDZ; flow-related transport resistance along groundwater pathways from the repository to the surface; and their the exit locations. Other analyses consider the

  13. Results of monitoring at Olkiluoto in 2012. Environment

    Energy Technology Data Exchange (ETDEWEB)

    Haapanen, A. (ed.) [Haapanen Forest Consulting, Vanhakylae (Finland)

    2014-04-15

    In 2003, Posiva Oy presented a programme for monitoring at Olkiluoto during construction and operation of ONKALO. In 2012 the monitoring programme was updated to concern the years 2012-2018. Part of the monitoring is performed by the company running the nuclear power plants on the island, Teollisuuden Voima Oy (TVO). This Working Report presents the main results of Posiva's environmental monitoring programme on Olkiluoto Island in 2012. Results are presented under five topics: 1. Evolution of geosphere, 2. Biosphere modelling input data, 3. Interaction between surface environment and groundwater in bedrock, 4. Environmental impact and 5. Baseline of monitoring of radioactive releases. Concerning the evolution of geosphere, LIDAR-scannings were done in the Olkiluoto area in 2012. The acquired data can be used for elevation and other modelling purposes. The soil solution quality in 2012 was quite comparable to that in earlier years. Proximity of the sea and the young age of soils are seen in soil solution results. Biosphere modelling input data in 2012 included e.g. continuous tree litterfall and transpiration data, as well as updated game statistics and population estimates of fauna, a fishery survey from the River Eurajoki (2011) and basic monitoring data from Olkiluoto offshore properties. Interaction between surface environment and groundwater in bedrock includes e.g. weather and surface water monitoring data. Environmental impact analyses included e.g. monitoring of noise, air quality, effluent waters and private drilled wells. Noise monitoring in the vicinity of ONKALO showed that in the case of raised noise levels the sources are mainly the traffic on Olkiluodontie road, the air conditioning of ONKALO and occasional sources such as springtime bird sounds. Construction activities in the area were seen in increased amount of NO{sub 3}-N in the bulk deposition, and Al and Fe accumulating on needle surfaces in areas close to the rock piling and crushing area

  14. Results of monitoring at Olkiluoto in 2010 - Environment

    International Nuclear Information System (INIS)

    Haapanen, A.

    2011-10-01

    This Working Report presents the main results of Posiva Oy's environmental monitoring programme on Olkiluoto Island in 2010. These summary reports have been published since 2005. The environmental monitoring system supervised by Posiva Oy produces input for biosphere modelling for long-term safety purposes as well as for monitoring the state of the environment during the construction (and later operation) of ONKALO underground rock characterization facility. Part of the monitoring is performed by the company running the nuclear power plants on the island, Teollisuuden Voima Oy (TVO). Monitoring has been carried out for varying periods of time depending on the sector: some monitoring activities performed by TVO originate from the 1970s and the repository-related environmental monitoring of Olkiluoto from the early 2000s. The monitoring programme evolves according to experiences gained from the modelling work and increased understanding of the site. Augmentations in 2010 include one previously unmonitored private drilled well, and sampling of crop plants, aquatic macrophytes, and bottom fauna, as well as soil and water in order to obtain more data on site-specific concentration ratios. In addition to Olkiluoto Island, two so called reference lakes have been included in the sampling. Studies have been going on on one reference mire, as well. Bottom fauna studies of River Eurajoki exist from late 1970s, but have not been presented here before. Dust produced during construction of the third nuclear power unit (OL3), ONKALO and related infrastructure can be seen in the analysis results of needle litter. The construction works and road traffic have a raising effect on the noise levels of the immediate surroundings. The land-use continues to change, but the remaining natural environment resembles other coastal locations. The young age of the soils and the closeness of the sea are reflected in the soil properties. Mammalian fauna on the island is typical of coastal areas in

  15. Signs of growth in the industry

    International Nuclear Information System (INIS)

    Taipale, Tellervo

    2002-01-01

    Full scale of methods in use - long-term work is the basis. Long-term work in communication has been proved to be an excellent basis for a nuclear power company. Teollisuuden Voima Oy (TVO), which has been producing electricity by nuclear power for the Finnish society for 23 years, bears its responsibilities for environmental issues and as member of society. Maintaining good relations to the local municipalities and reporters is one of our strengths. Nuclear power is a way to produce electricity in an environmentally friendly, safe and economical way. TVO, as a modem nuclear power company, acknowledges its responsibilities for the environment and the entire society. In dealing with these responsibilities, a culture of effective, open and honest communication is crucial. The concept of our communication work was already laid down in the 70's We do our best to inform our neighbours and interest groups openly about all that happens at Olkiluoto NPP. We do not only tell the good news, we also tell if there are any problems, e.g. in the production. We apply several different methods to allow everyone to choose their favourite way of finding the information they want. We produce annual publications and videos, organise visits to the plant, participate in fairs and have an up-to-date www-site. A lot of information is available and the doors are open for visitors. Annually, we produce almost 60 publications, e.g. magazines, newspapers, environmental and economical reports and different kinds of brochures. A lot of people visit Olkiluoto NPP - we receive about 16,000 guests each year. We have four basic arguments in our messages to promote the new NPP unit: it covers additional electricity demand and replaces old fossil-fuel power plants, it enables Finland to meet the Kyoto commitments, it secures a stable and predictable electricity price and reduces the dependency on imported electricity. All these messages are included in the printing materials and www-sites, as well as

  16. The probabilistic risk analysis of external hazards of an interim storage for spent nuclear fuel in Olkiluoto

    International Nuclear Information System (INIS)

    Puukka, Tiia

    2014-01-01

    Due to natural disasters occurred in the world and the experiences perceived of the Fukushima nuclear accident, the particular knowledge of the role and influence of external hazards in the safety of interim storage of spent nuclear fuel has been emphasized. For that reason it is substantial that they are included in the probabilistic risk assessment (PRA) of the interim storage facility. This is also required by the Regulatory Guides issued by The Finnish Radiation and Nuclear Safety Authority STUK. To enhance safety culture and nuclear safety in Olkiluoto, The Finnish utility Teollisuuden Voima Oyj has recently completed an analysis of external natural (seismic events are studied as a separate analysis) and unintentional human-induced risks associated with the spent fuel pool cooling and decay heat removal systems as part of the full-scope PRA study for the interim storage of spent fuel (KPA store). The analysis had four goals to achieve: (1) to determine the definition of an initiating event in the context of the KPA store, (2) to identify all potential external hazards and hazard combinations, (3) to perform a qualitative screening analysis based on frequency-strength analysis and detailed plant responses analysis and (4) to model the hazards passed the screening analysis so that model can be used as a risk analysis tool in the risk informed decision making and operating procedures. The assessment carried out included the analysis of operation procedures of decay heat removal, the study of external hazards related initiating events included in the PRA of the OL1 and OL2 nuclear power plants and their dependencies on the initiating events of the KPA store. All external hazards related initiating events were modeled using fault tree linking method. The main result and conclusion of this study was that using the screening analysis, initiating events caused by external hazards that could lead to leakage of the spent fuel pools or that could pose a threat to the

  17. Open environmental data sets - prospect of co-operation between public and private sector in water quality monitoring. Final report of Water Quality Service for Lakes -project; Avoin ympaeristoetieto - yhteistyoen kehittaeminen vesistoejen seurannassa. Jaervien vedenlaatupalvelu -hankkeen loppuraportti

    Energy Technology Data Exchange (ETDEWEB)

    Anttila, S.; Broeckl, M.; Herlevi, A. (and others)

    2012-04-15

    Data sets collected by the public sector are common property and should be freely available. Effective usage of this open data is anticipated to create new information and services, but also to develop welfare for humans. Insufficient usage of public and open environmental data sets in the private sector has been recognized as a problem. Reasons for this can be found from the non-commercial nature of environmental data, the way it is collected and archived, but also from the strong role of public sector in this field. In the Water Quality Service for Lakes -project (Tekes, 2009-2012), we wanted to advance the utilization of the public data sets in the private sector, as well as to promote the co-operation between these two sectors. Starting point was to develop local research infrastructure in the way that collected information would be easily accessible to private companies. This was realized by creating a data base that gathers water quality information from several data sources and provides a standardized interface for the data utilization. In addition, project provided a variety of research results including a questionnaire survey targeted to the users of water quality information, and the methods to increase the accuracy of collected data and to create forecasts from it. A concrete result from the project was also the development of 'laymans' water quality measurement device named as Secchi3000. A digital camera installed in e.g. mobile phones can be used with Secchi3000 device to measure water quality of different natural waters. This new innovation has great potential in e.g. citizen based monitoring. The challenges and opportunities to create business based on the public environmental data were revolved in two work shops. In this publication the prospects of co-operation between public and private sector are discussed based on the results of the Water Quality Service for lakes -project. (orig.)

  18. Regulatory control of nuclear safety in Finland. Annual report 1998

    Energy Technology Data Exchange (ETDEWEB)

    Tossavainen, K. [ed.

    1999-10-01

    The report describes regulatory control of the safe use of nuclear energy by the Radiation and Nuclear Safety Authority (STUK) in 1998. STUK is the Finnish nuclear safety authority. The submission of this report to the Ministry of Trade and Industry is stipulated in Section 121 of the Nuclear Energy Decree. It was verified by regulatory control that the operation of Finnish NPPs was in compliance with conditions set out in the operating licences of the plants and with regulations currently in force. In addition to supervising the normal operation of the plants, STUK oversaw projects carried out at the plant units, which related to the uprating of their power and the improvement of their safety. STUK issued to the Ministry of Trade and Industry a statement about applications for the renewal of the operating licences of Loviisa and Olkiluoto NPPs, which had been submitted by Imatran Voima Oy and Teollisuuden Voima Oy. Regulatory activities in the field of nuclear waste management were focused on the storage and final disposal of spent fuel as well as the treatment, storage and final disposal of reactor waste. STUK issued a statement to the Ministry of Trade and Industry about an environmental impact assessment programme pertaining to a spent fuel repository project, which had been submitted by Posiva Oy, as well as on Imatran Voima Oy's application concerning the operation of a repository for medium- and low-level reactor waste from Loviisa NPP. The use of nuclear materials was in compliance with the regulations currently in force and also the whereabouts of every batch of nuclear material were ensured by safeguards control. In international safeguards, important changes took place, which were reflected also in safeguards activities at national level. International co-operation continued based on financing both from STUK's budget and from additional sources. The focus of co-operation funded from outside sources was as follows: improvement of the safety of

  19. R20 Programme: Grout setting and strength development in ONKALO. Literature review, observations and experiments

    International Nuclear Information System (INIS)

    Karttunen, P.; Raivio, P.

    2008-12-01

    ONKALO is an underground rock characterisation facility planned to be a part of nuclear waste repository in future. ONKALO is located in Olkiluoto Finland. Posiva Oy owned by Teollisuuden Voima Oy and Fortum Power and Heat Oy is responsible for the repository, research, construction and use of the ONKALO and closing of the underground facility after use. During construction of ONKALO it has been observed that the setting and strength of grouting materials have not sporadically developed as expected (in ONKALO). The phenomenon has been observed for the first time in the year 2005. The observations examined in this report are made in the grouting field tests and in ordinary grouting during the year 2007. The phenomenon has been observed with low pH and standard grouts and bolt grouting mortars. The reasons for this phenomenon are studied based on literature review, observations and tests in the field and laboratory. The effect of reactions between groundwater and grout, the effect of the raw materials as well as curing conditions, temperature and pressure are studied. There are several potential factors that can cause observed phenomenon. Some factors are more probable than others. Laboratory experiments for the samples of poor strength development were done. These samples were taken from the grouting holes or packers in which the strength of the grout was not developed as expected. The results of these experiments were compared to the results gained from the samples cast from the same grout batches and cured in the tunnel conditions. The purpose was to find out the factor causing slow strength development of the grouted mixes. One single reason, which can slow the setting of the grouts in ONKALO is the low temperature in the rock, but the temperature cannot cause the phenomenon alone. Locally groundwater contains compounds that can create chemically aggressive environment for (the Portland) cement based grouts. The groundwater chemistry in ONKALO has not been proved

  20. Economics of nuclear power in Finland

    International Nuclear Information System (INIS)

    Tarjanne, Risto; Luostarinen, Kari

    2002-01-01

    The nuclear power generation fits perfectly with the long duration load profile of the Finnish power system. The good performance of the Finnish nuclear power has yielded benefits also to the consumers through its contribution to decreasing the electricity price. Furthermore, the introduction of nuclear power has resulted in a clear drop in carbon dioxide emissions from electricity generation in the shift of 1970's and 1980's. In the year 2001 the four Finnish nuclear power units at Loviisa and Olkiluoto generated 22.8 TWh electricity, equivalent to 28 per cent of the total consumption. Loviisa power station has a net output capacity of 2 x 488 MW, and Olkiluoto 2 x 840 MW. The capacity factors of the four nuclear units have been above 90 per cent, which are among the highest in the world. The energy-intensive process industries in particular have strong belief in nuclear power. In November 2000, Teollisuuden Voima company (TVO) submitted to the Finnish Government an application for decision in principle concerning the construction of a new nuclear power plant unit. The arguments were among other things to guarantee for the Finnish industry the availability of cheap electric energy and to meet the future growth of electricity consumption in Finland. The carbon-free nuclear power also represents the most efficient means to meet the Greenhouse Gas abatement quota of Finland. Simultaneously, the energy policy of the Government includes intensive R and D and investment support for the renewable energy sources and energy conservation, and the objective is also to replace coal with natural gas as much as reasonably possible. The fifth nuclear unit would be located in one of the existing Finnish nuclear sites, i.e. Olkiluoto or Loviisa. The size of the new nuclear unit would be in the range of 1000 to 1600 MW electric. The ready infrastructure of the existing site could be utilised resulting in lower investment cost for the new unit. The Finnish Government accepted the

  1. SAFIR2014. The Finnish Research Programme on Nuclear Power Plant Safety 2011-2014. Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Simola, K. [ed.

    2013-02-15

    The Finnish Nuclear Power Plant Safety Research Programme 2011-2014, SAFIR2014, is a 4-year publicly funded national technical and scientific research programme on the safety of nuclear power plants. The programme is funded by the State Nuclear Waste Management Fund (VYR), as well as other key organisations operating in the area of nuclear energy. The programme provides the necessary conditions for retaining knowledge needed for ensuring the continuance of safe use of nuclear power, for developing new know-how and for participation in international co-operation. The SAFIR2014 Steering Group, responsible of the strategic alignements of the programme, consists of representatives of the Finnish Nuclear Safety Authority (STUK), Ministry of Employment and the Economy (MEE), Technical Research Centre of Finland (VTT), Teollisuuden Voima Oyj (TVO), Fortum Power and Heat Oy (Fortum), Fennovoima Oy, Lappeenranta University of Technology (LUT), Aalto University (Aalto), Finnish Funding Agency for Technology and Innovation (Tekes), Finnish Institute of Occupational Health (TTL) and the Swedish Radiation Safety Authority (SSM). The research programme is divided into nine areas: Man, organisation and society, Automation and control room, Fuel research and reactor analysis, Thermal hydraulics, Severe accidents, Structural safety of reactor circuits, Construction safety, Probabilistic risk analysis (PRA), and Development of research infrastructure. A reference group is assigned to each of these areas to respond for the strategic planning and to supervise the projects in its respective field. Research projects are selected annually based on a public call for proposals. Most of the projects are planned for the entire duration of the programme, but there can also be shorter one- or two-year projects. The annual volume of the SAFIR2014 programme in 2011-2012 has been 9,5-9,9 M euro. Main funding organisations were the State Nuclear Waste Management Fund (VYR) with over 5 M euro and

  2. Regulatory control of nuclear safety in Finland. Annual report 1998

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1999-10-01

    The report describes regulatory control of the safe use of nuclear energy by the Radiation and Nuclear Safety Authority (STUK) in 1998. STUK is the Finnish nuclear safety authority. The submission of this report to the Ministry of Trade and Industry is stipulated in Section 121 of the Nuclear Energy Decree. It was verified by regulatory control that the operation of Finnish NPPs was in compliance with conditions set out in the operating licences of the plants and with regulations currently in force. In addition to supervising the normal operation of the plants, STUK oversaw projects carried out at the plant units, which related to the uprating of their power and the improvement of their safety. STUK issued to the Ministry of Trade and Industry a statement about applications for the renewal of the operating licences of Loviisa and Olkiluoto NPPs, which had been submitted by Imatran Voima Oy and Teollisuuden Voima Oy. Regulatory activities in the field of nuclear waste management were focused on the storage and final disposal of spent fuel as well as the treatment, storage and final disposal of reactor waste. STUK issued a statement to the Ministry of Trade and Industry about an environmental impact assessment programme pertaining to a spent fuel repository project, which had been submitted by Posiva Oy, as well as on Imatran Voima Oy's application concerning the operation of a repository for medium- and low-level reactor waste from Loviisa NPP. The use of nuclear materials was in compliance with the regulations currently in force and also the whereabouts of every batch of nuclear material were ensured by safeguards control. In international safeguards, important changes took place, which were reflected also in safeguards activities at national level. International co-operation continued based on financing both from STUK's budget and from additional sources. The focus of co-operation funded from outside sources was as follows: improvement of the safety of Kola and

  3. SAFIR2014. The Finnish Research Programme on Nuclear Power Plant Safety 2011-2014. Interim Report

    International Nuclear Information System (INIS)

    Simola, K.

    2013-02-01

    The Finnish Nuclear Power Plant Safety Research Programme 2011-2014, SAFIR2014, is a 4-year publicly funded national technical and scientific research programme on the safety of nuclear power plants. The programme is funded by the State Nuclear Waste Management Fund (VYR), as well as other key organisations operating in the area of nuclear energy. The programme provides the necessary conditions for retaining knowledge needed for ensuring the continuance of safe use of nuclear power, for developing new know-how and for participation in international co-operation. The SAFIR2014 Steering Group, responsible of the strategic alignements of the programme, consists of representatives of the Finnish Nuclear Safety Authority (STUK), Ministry of Employment and the Economy (MEE), Technical Research Centre of Finland (VTT), Teollisuuden Voima Oyj (TVO), Fortum Power and Heat Oy (Fortum), Fennovoima Oy, Lappeenranta University of Technology (LUT), Aalto University (Aalto), Finnish Funding Agency for Technology and Innovation (Tekes), Finnish Institute of Occupational Health (TTL) and the Swedish Radiation Safety Authority (SSM). The research programme is divided into nine areas: Man, organisation and society, Automation and control room, Fuel research and reactor analysis, Thermal hydraulics, Severe accidents, Structural safety of reactor circuits, Construction safety, Probabilistic risk analysis (PRA), and Development of research infrastructure. A reference group is assigned to each of these areas to respond for the strategic planning and to supervise the projects in its respective field. Research projects are selected annually based on a public call for proposals. Most of the projects are planned for the entire duration of the programme, but there can also be shorter one- or two-year projects. The annual volume of the SAFIR2014 programme in 2011-2012 has been 9,5-9,9 M euro. Main funding organisations were the State Nuclear Waste Management Fund (VYR) with over 5 M euro and

  4. Main messages for the new nuclear unit in Finland

    International Nuclear Information System (INIS)

    Nikula, Anneli

    2001-01-01

    Teollisuuden Voima Oy (TVO) submitted last year, on 15th November, to the Council of State an application for a decision in principle concerning the construction of additional nuclear capacity. In this presentation, the main messages to decision makers for the new unit are discussed. Also the studies, which the messages are based on, are described. According to the Finnish Nuclear Energy Act, a company considering a nuclear plant project must apply for a decision in principle from the Government beforehand. The Government then decides whether the project is in accordance with the overall good of the society. If the decision is positive, it needs ratification by the Parliament. Before the Government decision, various interested parties are heard, including the municipality of location and the Radiation and Nuclear Safety Authority. The phase of statements is underway and they all will be ready by the end of March 2001. The entire application process takes approximately 1-2 years. The main messages arguing for more nuclear power in Finland were as follows. The new nuclear power plant unit replaces old fossil power plants and satisfies the need for additional demand of electricity; makes possible to meet the requirements of the Kyoto agreement; reduces the dependence on the imported energy and assures a stable and predictable electricity price. Messaging concerning a new nuclear power plant unit is made in co-operation with several organisations. The most important of them, in addition to the company shareholders, are the companies which have shown interested in the new project as well as the Finnish Energy Industries Federation (Finergy) and the Confederation of Finnish Industry and Employers. A transparency folder 'Nuclear electricity 2000' was put together of the messages in collaboration with the organisations. The folder was distributed to about 400 opinion leaders in the energy field. To ensure the consistency of the messages, several interest group meetings

  5. Extension of the Repository Under Excavation. The Opinions of the Local Residents in the Municipality of Eurajoki

    International Nuclear Information System (INIS)

    Kojo, Matti; Kari, Mika; Litmanen, Tapio

    2009-12-01

    The aim of the paper is to provide updated information on the opinions of residents of Eurajoki municipality concerning the disposal facility for spent nuclear fuel (SNF) in Finland. The SNF facility project is approaching the construction licence phase by 2012. At the same time as it prepares for the next phase the nuclear waste company Posiva Oy is planning to extend the disposal capacity of the facility up to 12000 tU due to the revival of nuclear energy policy in Finland. It is not only the owners of Posiva, namely Teollisuuden Voima (TVO) and Fortum Power and Heat (FPH), who need more disposal capacity. A brand new nuclear operator Fennovoima is also interested in disposing of its SNF into Posiva's facility. The possible extension of the SNF facility needs to be approved by the council of Eurajoki municipality. According to the Nuclear Energy Act the council has the right of veto. The original application of Posiva was approved by the council in 2000. According to an opinion poll 59% of the residents of the Eurajoki municipality would have accepted the siting in 1999 if the facility were found safe by the investigations of the authorities. The Olkiluoto site in the municipality of Eurajoki was chosen to be the site for further investigations in accordance with the DiP of 2000 by the Council of State. The DiP was ratified by Parliament in May 2001. Thus the local residents have lived the post site selection phase for nearly one decade. During this phase Posiva, for example, has started excavations for the Underground Rock Characterization Facility Onkalo into the bedrock of Olkiluoto. The residents have also experienced years of risk communication after the site selection of 2001. However, two recent surveys indicate that the local attitudes are showing increasing reservations rather than confidence regarding the disposal of SNF in Olkiluoto. Furthermore, data show that over 50% of the residents perceived at least an explicit threat to the health, safety and

  6. Results of Monitoring at Olkiluoto in 2011. Environment

    Energy Technology Data Exchange (ETDEWEB)

    Haapanen, A. [Haapanen Forest Consulting, Vanhakylae (Finland)

    2012-11-15

    This Working Report presents the main results of Posiva Oy's environmental monitoring programme on Olkiluoto Island in 2011. These summary reports have been published since 2005. The environmental monitoring system supervised by Posiva Oy produces input for biosphere modelling for long-term safety purposes as well as for monitoring the state of the environment during the construction (and later operation) of ONKALO underground rock characterization facility. Part of the monitoring is performed by the company running the nuclear power plants on the island, Teollisuuden Voima Oy (TVO). Monitoring has been carried out for varying periods of time depending on the sector: some monitoring activities performed by TVO originate from the 1970s and the repository-related environmental monitoring of Olkiluoto from the early 2000s. The monitoring programme evolves according to experiences gained from the modelling work and increased understanding of the site. Monitoring activities in 2011 proceeded according to the plans. The land-use of the island continues to change due to the construction work of OL3, ONKALO and related infrastructure, but the remaining natural environment resembles other coastal locations. The amount of nitrogen in the bulk deposition increased in 2011, whereas that of sulphur decreased. Some litterfall fractions showed higher Al and Fe values than earlier, likely caused by soil dust. Proximity of the sea is seen in wet deposition and soil solution results. Soil solution also reflects the young age of soils. Undestorey vegetation has shown no essential changes during the monitoring period. Mammalian fauna on the island is typical of coastal areas in Southwestern Finland. Game catches vary according to hunting pressure and natural variation in populations. The condition of the nearby sea is affected by the continuous land uplift, the shallowness of the area, the weather conditions, the general condition of the Bothnian Sea, the nutrient and sediment loads

  7. Imaging the risks - risking the image: Social impact assessment of the final disposal facility

    International Nuclear Information System (INIS)

    Avolahti, J.; Vira, J.

    1999-01-01

    Preparations for the final disposal of spent nuclear fuel in Finland started about twenty years ago. At present the work is carried out by Posiva Oy, which in 1996 took over the programme managed earlier by Teollisuuden Voima Oy, one of the country's nuclear power companies. From 1996 on the preparations have been made for all the spent fuel from Finnish nuclear power stations. The site for the final disposal facility will be selected among four alternatives by the end of 2000 and - assuming that the technical approach proposed by Posiva is accepted by the Government and the Parliament - the construction of the repository will start in the 2010s. The disposal operations are planned to be started in 2020. The alternative four sites have gone through a systematic site selection process based on geologic siting criteria and on environmental and cultural considerations. One of the objectives of the process was to avoid inhabited areas, agricultural fields, valuable groundwater or preservation areas as well as areas which might draw interest as regards the potential for ore deposits. The idea was that the field investigations and later the possible disposal facility should not cause any harm to local people. Two of the candidate sites are at present nuclear power plant sites situated at the coast, the two other candidates are inland sites with no nuclear activities. The geologic siting investigations were started in 1987. Interim assessments of the results so far have been made in 1992 and 1996 and a final report of all the investigations will be published before the end of 2000. The present view is that all four candidates are geologically suitable for siting the repository. Posiva's EIA for the final disposal of spent fuel in Finland is nearing completion. A considerable effort was made to involve local groups and individuals in the assessment process. Yet the participation remained limited and consisted mainly of active opponents of the project and of those who were

  8. Imaging the risks - risking the image: Social impact assessment of the final disposal facility

    Energy Technology Data Exchange (ETDEWEB)

    Avolahti, J.; Vira, J. [Posiva Oy, Helsinki (Finland)

    1999-12-01

    Preparations for the final disposal of spent nuclear fuel in Finland started about twenty years ago. At present the work is carried out by Posiva Oy, which in 1996 took over the programme managed earlier by Teollisuuden Voima Oy, one of the country's nuclear power companies. From 1996 on the preparations have been made for all the spent fuel from Finnish nuclear power stations. The site for the final disposal facility will be selected among four alternatives by the end of 2000 and - assuming that the technical approach proposed by Posiva is accepted by the Government and the Parliament - the construction of the repository will start in the 2010s. The disposal operations are planned to be started in 2020. The alternative four sites have gone through a systematic site selection process based on geologic siting criteria and on environmental and cultural considerations. One of the objectives of the process was to avoid inhabited areas, agricultural fields, valuable groundwater or preservation areas as well as areas which might draw interest as regards the potential for ore deposits. The idea was that the field investigations and later the possible disposal facility should not cause any harm to local people. Two of the candidate sites are at present nuclear power plant sites situated at the coast, the two other candidates are inland sites with no nuclear activities. The geologic siting investigations were started in 1987. Interim assessments of the results so far have been made in 1992 and 1996 and a final report of all the investigations will be published before the end of 2000. The present view is that all four candidates are geologically suitable for siting the repository. Posiva's EIA for the final disposal of spent fuel in Finland is nearing completion. A considerable effort was made to involve local groups and individuals in the assessment process. Yet the participation remained limited and consisted mainly of active opponents of the project and of those

  9. Extension of the Repository Under Excavation. The Opinions of the Local Residents in the Municipality of Eurajoki

    Energy Technology Data Exchange (ETDEWEB)

    Kojo, Matti (Univ. of Tampere, Dept. of Political Science and International Relations, Tampere (Finland)); Kari, Mika; Litmanen, Tapio (Univ. of Jyvaeskylae, Dept. of Social Sciences and Philosophy, Jyvaeskylae (Finland))

    2009-12-15

    The aim of the paper is to provide updated information on the opinions of residents of Eurajoki municipality concerning the disposal facility for spent nuclear fuel (SNF) in Finland. The SNF facility project is approaching the construction licence phase by 2012. At the same time as it prepares for the next phase the nuclear waste company Posiva Oy is planning to extend the disposal capacity of the facility up to 12000 tU due to the revival of nuclear energy policy in Finland. It is not only the owners of Posiva, namely Teollisuuden Voima (TVO) and Fortum Power and Heat (FPH), who need more disposal capacity. A brand new nuclear operator Fennovoima is also interested in disposing of its SNF into Posiva's facility. The possible extension of the SNF facility needs to be approved by the council of Eurajoki municipality. According to the Nuclear Energy Act the council has the right of veto. The original application of Posiva was approved by the council in 2000. According to an opinion poll 59% of the residents of the Eurajoki municipality would have accepted the siting in 1999 if the facility were found safe by the investigations of the authorities. The Olkiluoto site in the municipality of Eurajoki was chosen to be the site for further investigations in accordance with the DiP of 2000 by the Council of State. The DiP was ratified by Parliament in May 2001. Thus the local residents have lived the post site selection phase for nearly one decade. During this phase Posiva, for example, has started excavations for the Underground Rock Characterization Facility Onkalo into the bedrock of Olkiluoto. The residents have also experienced years of risk communication after the site selection of 2001. However, two recent surveys indicate that the local attitudes are showing increasing reservations rather than confidence regarding the disposal of SNF in Olkiluoto. Furthermore, data show that over 50% of the residents perceived at least an explicit threat to the health, safety

  10. Results of Monitoring at Olkiluoto in 2011. Environment

    International Nuclear Information System (INIS)

    Haapanen, A.

    2012-11-01

    This Working Report presents the main results of Posiva Oy's environmental monitoring programme on Olkiluoto Island in 2011. These summary reports have been published since 2005. The environmental monitoring system supervised by Posiva Oy produces input for biosphere modelling for long-term safety purposes as well as for monitoring the state of the environment during the construction (and later operation) of ONKALO underground rock characterization facility. Part of the monitoring is performed by the company running the nuclear power plants on the island, Teollisuuden Voima Oy (TVO). Monitoring has been carried out for varying periods of time depending on the sector: some monitoring activities performed by TVO originate from the 1970s and the repository-related environmental monitoring of Olkiluoto from the early 2000s. The monitoring programme evolves according to experiences gained from the modelling work and increased understanding of the site. Monitoring activities in 2011 proceeded according to the plans. The land-use of the island continues to change due to the construction work of OL3, ONKALO and related infrastructure, but the remaining natural environment resembles other coastal locations. The amount of nitrogen in the bulk deposition increased in 2011, whereas that of sulphur decreased. Some litterfall fractions showed higher Al and Fe values than earlier, likely caused by soil dust. Proximity of the sea is seen in wet deposition and soil solution results. Soil solution also reflects the young age of soils. Undestorey vegetation has shown no essential changes during the monitoring period. Mammalian fauna on the island is typical of coastal areas in Southwestern Finland. Game catches vary according to hunting pressure and natural variation in populations. The condition of the nearby sea is affected by the continuous land uplift, the shallowness of the area, the weather conditions, the general condition of the Bothnian Sea, the nutrient and sediment loads

  11. Results of Monitoring at Olkiluoto in 2011. Environment

    Energy Technology Data Exchange (ETDEWEB)

    Haapanen, A. (ed.) [Haapanen Forest Consulting, Vanhakylae (Finland)

    2012-11-15

    This Working Report presents the main results of Posiva Oy's environmental monitoring programme on Olkiluoto Island in 2011. These summary reports have been published since 2005. The environmental monitoring system supervised by Posiva Oy produces input for biosphere modelling for long-term safety purposes as well as for monitoring the state of the environment during the construction (and later operation) of ONKALO underground rock characterization facility. Part of the monitoring is performed by the company running the nuclear power plants on the island, Teollisuuden Voima Oy (TVO). Monitoring has been carried out for varying periods of time depending on the sector: some monitoring activities performed by TVO originate from the 1970s and the repository-related environmental monitoring of Olkiluoto from the early 2000s. The monitoring programme evolves according to experiences gained from the modelling work and increased understanding of the site. Monitoring activities in 2011 proceeded according to the plans. The land-use of the island continues to change due to the construction work of OL3, ONKALO and related infrastructure, but the remaining natural environment resembles other coastal locations. The amount of nitrogen in the bulk deposition increased in 2011, whereas that of sulphur decreased. Some litterfall fractions showed higher Al and Fe values than earlier, likely caused by soil dust. Proximity of the sea is seen in wet deposition and soil solution results. Soil solution also reflects the young age of soils. Undestorey vegetation has shown no essential changes during the monitoring period. Mammalian fauna on the island is typical of coastal areas in Southwestern Finland. Game catches vary according to hunting pressure and natural variation in populations. The condition of the nearby sea is affected by the continuous land uplift, the shallowness of the area, the weather conditions, the general condition of the Bothnian Sea, the nutrient and sediment

  12. Olkiluoto surface hydrological modelling: Update 2012 including salt transport modelling

    International Nuclear Information System (INIS)

    Karvonen, T.

    2013-11-01

    Posiva Oy is responsible for implementing a final disposal program for spent nuclear fuel of its owners Teollisuuden Voima Oyj and Fortum Power and Heat Oy. The spent nuclear fuel is planned to be disposed at a depth of about 400-450 meters in the crystalline bedrock at the Olkiluoto site. Leakages located at or close to spent fuel repository may give rise to the upconing of deep highly saline groundwater and this is a concern with regard to the performance of the tunnel backfill material after the closure of the tunnels. Therefore a salt transport sub-model was added to the Olkiluoto surface hydrological model (SHYD). The other improvements include update of the particle tracking algorithm and possibility to estimate the influence of open drillholes in a case where overpressure in inflatable packers decreases causing a hydraulic short-circuit between hydrogeological zones HZ19 and HZ20 along the drillhole. Four new hydrogeological zones HZ056, HZ146, BFZ100 and HZ039 were added to the model. In addition, zones HZ20A and HZ20B intersect with each other in the new structure model, which influences salinity upconing caused by leakages in shafts. The aim of the modelling of long-term influence of ONKALO, shafts and repository tunnels provide computational results that can be used to suggest limits for allowed leakages. The model input data included all the existing leakages into ONKALO (35-38 l/min) and shafts in the present day conditions. The influence of shafts was computed using eight different values for total shaft leakage: 5, 11, 20, 30, 40, 50, 60 and 70 l/min. The selection of the leakage criteria for shafts was influenced by the fact that upconing of saline water increases TDS-values close to the repository areas although HZ20B does not intersect any deposition tunnels. The total limit for all leakages was suggested to be 120 l/min. The limit for HZ20 zones was proposed to be 40 l/min: about 5 l/min the present day leakages to access tunnel, 25 l/min from

  13. Olkiluoto surface hydrological modelling: Update 2012 including salt transport modelling

    Energy Technology Data Exchange (ETDEWEB)

    Karvonen, T. [WaterHope, Helsinki (Finland)

    2013-11-15

    Posiva Oy is responsible for implementing a final disposal program for spent nuclear fuel of its owners Teollisuuden Voima Oyj and Fortum Power and Heat Oy. The spent nuclear fuel is planned to be disposed at a depth of about 400-450 meters in the crystalline bedrock at the Olkiluoto site. Leakages located at or close to spent fuel repository may give rise to the upconing of deep highly saline groundwater and this is a concern with regard to the performance of the tunnel backfill material after the closure of the tunnels. Therefore a salt transport sub-model was added to the Olkiluoto surface hydrological model (SHYD). The other improvements include update of the particle tracking algorithm and possibility to estimate the influence of open drillholes in a case where overpressure in inflatable packers decreases causing a hydraulic short-circuit between hydrogeological zones HZ19 and HZ20 along the drillhole. Four new hydrogeological zones HZ056, HZ146, BFZ100 and HZ039 were added to the model. In addition, zones HZ20A and HZ20B intersect with each other in the new structure model, which influences salinity upconing caused by leakages in shafts. The aim of the modelling of long-term influence of ONKALO, shafts and repository tunnels provide computational results that can be used to suggest limits for allowed leakages. The model input data included all the existing leakages into ONKALO (35-38 l/min) and shafts in the present day conditions. The influence of shafts was computed using eight different values for total shaft leakage: 5, 11, 20, 30, 40, 50, 60 and 70 l/min. The selection of the leakage criteria for shafts was influenced by the fact that upconing of saline water increases TDS-values close to the repository areas although HZ20B does not intersect any deposition tunnels. The total limit for all leakages was suggested to be 120 l/min. The limit for HZ20 zones was proposed to be 40 l/min: about 5 l/min the present day leakages to access tunnel, 25 l/min from

  14. Recurring Events in the Finnish Nuclear Power Plants

    International Nuclear Information System (INIS)

    Suksi, Seija; Olander, Ronnie; Tiippana, Petteri

    2003-01-01

    An analysis and evaluation of event investigation methods applied by the Radiation and Nuclear Safety Authority (STUK), and the two Finnish nuclear power plant operators Teollisuuden Voima Oy (TVO) and Fortum Power and Heat Oy (Fortum) was carried out by the Technical Research Centre (VIT) on an assignment from STUK. The study aimed at providing a broad overview of the whole organisational framework to support event investigation practices at the regulatory body and at the utilities. The study was part of the IAEA Co-ordinated Research Programme (CRP) on 'Investigation of Methodologies for Incident Analysis'. The main objective of the research was to evaluate the adequacy and reliability of event investigation analysis methods and practices in the Finnish nuclear power industry and based on the results to further develop them. In general, the direct causes of identified events could be detected and eliminated, but more emphasis should be given to the prevention of recurrence of events and identification of common causes and latent failures. The study showed that the evaluated organisations had rather comprehensive incident analysis arrangements. The study also showed that more focus and prioritisation are needed. Deficiencies were identified mostly in the areas of recording, assessment and classification of new events, use of existing operating experience data, utilisation of information technology tools, and allocation of work and resources. Also the indicators or measures for the effectiveness of event investigation and operating experience feedback were missing. All organisations should maintain adequate resources in this area. The researchers suggested a more effective operating experience feedback loop. Especially more attention should be paid to root cause analysis of significant events, tasks and activities where the initial errors have occurred, and weaknesses of defensive barriers. It was also recommended that implementing periodic operational experience

  15. Material input of nuclear fuel

    International Nuclear Information System (INIS)

    Rissanen, S.; Tarjanne, R.

    2001-01-01

    The Material Input (MI) of nuclear fuel, expressed in terms of the total amount of natural material needed for manufacturing a product, is examined. The suitability of the MI method for assessing the environmental impacts of fuels is also discussed. Material input is expressed as a Material Input Coefficient (MIC), equalling to the total mass of natural material divided by the mass of the completed product. The material input coefficient is, however, only an intermediate result, which should not be used as such for the comparison of different fuels, because the energy contents of nuclear fuel is about 100 000-fold compared to the energy contents of fossil fuels. As a final result, the material input is expressed in proportion to the amount of generated electricity, which is called MIPS (Material Input Per Service unit). Material input is a simplified and commensurable indicator for the use of natural material, but because it does not take into account the harmfulness of materials or the way how the residual material is processed, it does not alone express the amount of environmental impacts. The examination of the mere amount does not differentiate between for example coal, natural gas or waste rock containing usually just sand. Natural gas is, however, substantially more harmful for the ecosystem than sand. Therefore, other methods should also be used to consider the environmental load of a product. The material input coefficient of nuclear fuel is calculated using data from different types of mines. The calculations are made among other things by using the data of an open pit mine (Key Lake, Canada), an underground mine (McArthur River, Canada) and a by-product mine (Olympic Dam, Australia). Furthermore, the coefficient is calculated for nuclear fuel corresponding to the nuclear fuel supply of Teollisuuden Voima (TVO) company in 2001. Because there is some uncertainty in the initial data, the inaccuracy of the final results can be even 20-50 per cent. The value

  16. Nuclear waste information in supplements of local newspapers

    International Nuclear Information System (INIS)

    Ryhaenen, Veijo

    1995-01-01

    Full text: The utility Teollisuuden Voima Oy (TVO) is conducting site investigations in Finland to select a final disposal site for spent nuclear fuel. Site selection studies, including deep drillings and other field investigations, have been carried out in different parts of the country since 1987. Now there are three areas in which detailed studies are continued. The programme aims at site selection in the year 2000. Before the construction of the final disposal facility can be started around the year 2010 a precondition in the Finnish legislation is that the council of the local municipality accepts the facility. Hence, an essential task is to distribute information of the studies and of the principles of final disposal to the local decision-makers and public. Information work has an important role already now in order to make people familiar with the long-term project and to build confidence on the safety of final disposal. TVO's information programme includes several types of actions to different target groups, such as press conferences, contact group meetings, open houses, exhibitions, lectures to different groups, visits to the drilling sites and to the existing nuclear waste facilities as well as use of various written material. In January 1994 a new method was applied in the distribution of TVO's written information directly to local public. Four-page supplements were prepared to the local newspapers to inform public of the stage of the site investigations and other topical issues. After that, new supplements have been published in six months intervals. Own supplements have been made for different municipalities in which the candidate areas are situated. The form of the supplement is same as that of the newspaper. As a matter of fact, TVO's information forms a special advertising section in a single issue of a newspaper. The topics handled in the supplements are for example present status of the local bedrock studies, other topical information of TVO

  17. Organizational Challenge of Posiva’s Final Disposal Programme: From an R&D Organization to a Project Organization, and Further Towards an Operational Organization

    International Nuclear Information System (INIS)

    Mokka, J.

    2016-01-01

    Full text: Posiva Oy is an expert organization established in 1995 and responsible for the final disposal of the spent nuclear fuel of its owners. Posiva currently employs around 100 people and has a turnover of some 63 million (2015). The company headquarters are located in Olkiluoto in the municipality of Eurajoki, Finland. Posiva is owned by two Finnish NPP operators Teollisuuden Voima Oyj (60%) (TVO) and Fortum Power & Heat Oy (40%), both of which are responsible for their costs of nuclear waste management. The Finnish final disposal programme has a long history. When NPP unit Olkiluoto 1 renewed its operating licence for the first time in 1983, TVO presented a programme showing final disposal to commence in the 2020s. In the 1980s and 1990s, the programme concentrated on concept development and site selection activities. After 2003, when Posiva received the decision in principle from the Finnish Government, a new phase began in the programme. Since 2004, Posiva Oy has constructed an underground rock characterization facility on the repository site in Olkiluoto, in western Finland. This facility, called ONKALO, has provided an opportunity to carry out further site investigations, develop construction techniques, and test and demonstrate the engineered barrier system in an actual repository environment. As a result of these investigations and development efforts, the application for a licence to construct the encapsulation plant and the geological repository was submitted in 2012. The Radiation and Nuclear Safety Authority in Finland (STUK) first gave a positive review on the safety of the facility, and consequently the Finnish Government granted the construction licence in November 2015. After receiving the construction licence as the first disposal programme in the world, the next phase in the program will be the construction project of the final disposal facilities required for the disposal operations. A significant first-of-a-kind construction project like

  18. A Self-Evaluation Tool for Development of Maintenance Personnel's Competences

    International Nuclear Information System (INIS)

    Piirto, A.; Paajanen, P.; Kantola, J.; Vanharanta, H.

    2007-01-01

    Teollisuuden Voima Oy (TVO) operates Olkiluoto nuclear power plant, which consists of twin 840 MWe BWR units. The first nuclear power plant unit, Olkiluoto 1, was connected to the national grid in September 1978 and the second almost identical unit, Olkiluoto 2, in February 1980. The construction of the third 1600 MWe PWR unit, Olkiluoto 3, was started in the spring 2005. The commercial operation of the new unit will start in 2009. The operation results of TVO's nuclear power plant units have been among the best ones in the world. The operational success is primary attributable to the early elimination of technical problems and preparation for defects beforehand. Also development of outage planning, maintenance methods and a low rate of disturbances have been very significant in achieving good operation results. TVO's long-term goals in operation and maintenance are: - keeping the load factor over 90 % and avoiding operational disturbances; - keeping the technical condition of the plant units 'as new'; - continuous learning and development of operation and maintenance functions; - decreasing the production costs. These goals also set requirements for maintenance personnel's competences. The high-grade competence of maintenance personnel has an effect on safe and reliable nuclear power plant operation. However, as a concept, safety is not always easy to define. A high level of safety is the result of the complex interaction of good design, operational safety and human performance: A set of indicators which are designed to monitor all aspects of operational safety performance are needed to form a total picture of the safe plant operation. In the framework six key areas of improvement of nuclear safety are defined. These key areas of improvement are based on the vision that the plant operates with low risk. Implementation of the actions will result in direct and permanent positive impact on plant nuclear safety and safety culture. The information gained from

  19. The site of a nuclear power plant and environmental safety; Ydinvoimalaitoksen sijaintipaikka ja ympaeristoen turvallisuus

    Energy Technology Data Exchange (ETDEWEB)

    Rossi, J. [VTT Energy, Espoo (Finland)

    2001-11-01

    guidelines concerning nuclear power plant safety and in the guides of the Radiation and Nuclear Safety Authority (STUK). International Atomic Energy Agency (IAEA) has published the Safety Standard concerning the site selection. There are two nuclear power plant sites in Finland; Olkiluoto in Eurajoki municipality and Haestholmen in the town of Loviisa; both of these are also proposed for the site of a new nuclear power plant unit in the application for decision in principle submitted to the Council of State by Teollisuuden Voima Oy (TVO). The Finnish sites are located on the coast, but in other countries there are also inland sites. The surroundings of the Finnish sites are relatively sparsely populated compared with e.g. the sites in USA and in Germany. Concerning external initial events, Finland is calm area, e.g. bedrock is stable and severe weather phenomena are not occurring. Persons and their organisations participating in the design, building and operation of a nuclear power plant as well as controlling these activities have an essential role in creating, maintaining and development of safety. Thus particular attention is paid to their ability and operational preconditions as well as to the quality control methods and safety culture of their organisations. The safety of the plant is based partly on design basis, according to which the plant shall survive in a sufficient way from incidents and accidents. Design bases include internal events of the power plant and external events such as flood, earthquake and crash of an aeroplane. The power plant is aimed to be constructed in such a way that it would not be damaged in an accident to such extent that radioactive material would be released to the environment. Applying appropriate rescue or radiation protection measures such as local sheltering, iodine tablets and evacuation can mitigate offsite damages possibly followed by the release caused by an accident. In addition to deterministic analyses accomplished to prove out

  20. Partnerships and Opportunity: A Canadian Success Story Community engagement on uranium mining in northern Saskatchewan. Informing and Involving Stakeholders in the Context of the Finnish Decision-making Process. Stakeholder involvement and public debate

    International Nuclear Information System (INIS)

    Katz, Sharonne; Vanhatalo, Hanna; Thome-Jassaud, Pierre-Franck

    2017-01-01

    Session 5 featured case studies of stakeholder involvement in decisions related to new nuclear power and fuel cycle facilities. The chair highlighted that more than 30 countries either have nuclear power facilities or are considering developing them, and 15 countries are currently building new reactors. The topic of new nuclear facilities is quite broad, and the session covered three case studies that were quite different. Ms Katz of Natural Resources Canada Limited outlined stakeholder engagement commitments by a number of actors in Canada, including the Canadian Nuclear Safety Commission. She provided an overview on Cameco's behalf of their experience in engaging the local stakeholders of uranium mining activities. Ms Vanhatalo reviewed Fennovoima's activities related to the site selection and move towards construction of a new nuclear reactor. Mr Thome-Jassaud presented the experience of electricite de France on two proposed reactor projects with France's formalised public debate process. A central theme of the presentations was the importance of establishing and maintaining a good reputation, especially in the local community. Ms Katz relayed a story of Cameco inviting community leaders, near an Australian property that Cameco had acquired to visit a mining community in Saskatchewan. Instead of tightly controlling the interaction, Cameco left the Australian guests to stay with local families for several days to ask questions and hear directly from members of the Canadian community without any interference. This required confidence on the part of the company that it had built a strong and positive relationship with the Canadian host community. Ms Vanhatalo described how the success in siting nuclear power plant Hanhikivi 1 near Pyhaejoki was attributable not only to Fennovoima's commitment to engage the community, but also to the reputation that the company Teollisuuden Voima Oy had built with its Olkiluoto nuclear power plant and the positive association with