WorldWideScience

Sample records for system privatization project

  1. The Cc1 ProjectSystem For Private Cloud Computing

    Directory of Open Access Journals (Sweden)

    J Chwastowski

    2012-01-01

    Full Text Available The main features of the Cloud Computing system developed at IFJ PAN are described. The project is financed from the structural resources provided by the European Commission and the Polish Ministry of Science and Higher Education (Innovative Economy, National Cohesion Strategy. The system delivers a solution for carrying out computer calculations on a Private Cloud computing infrastructure. It consists of an intuitive Web based user interface, a module for the users and resources administration and the standard EC2 interface implementation. Thanks to the distributed character of the system it allows for the integration of a geographically distant federation of computer clusters within a uniform user environment.

  2. Private Water Projects

    OpenAIRE

    Izaguirre, Ada Karina; Hunt, Catherine

    2005-01-01

    Drawing on the World Bank's Private Participation in Infrastructure Project Database, this Note reviews developments in the water and sewerage sector of developing countries in 2004 and changes in private participation in the sector since 2001. Data for 2004 show that total investment in water and sewerage projects with private participation amounted to nearly US$2 billion. Recent private ...

  3. Interface control document for tank waste remediation system privatization phase 1 infrastructure support Project W-519

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This document describes the functional and physical interfaces between the Tank Waste Remediation System (TWRS) Privatization Phase 1 Infrastructure Project W-519 and the various other projects (i.e., Projects W-314, W-464, W-465, and W-520) supporting Phase 1 that will require the allocation of land in and about the Privatization Phase 1 Site and/or interface with the utilities extended by Project W-519. Project W-519 will identify land use allocations and upgrade/extend several utilities in the 200-East Area into the Privatization Phase 1 Site (formerly the Grout Disposal Compound) in preparation for the Privatization Contractors (PC) to construct treatment facilities. The project will upgrade/extend: Roads, Electrical Power, Raw Water (for process and fire suppression), Potable Water, and Liquid Effluent collection. The replacement of an existing Sanitary Sewage treatment system that may be displaced by Phase 1 site preparation activities may also be included

  4. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  5. A planning support system to optimize approval of private housing development projects

    Science.gov (United States)

    Hussnain, M. Q.; Wakil, K.; Waheed, A.; Tahir, A.

    2016-06-01

    Out of 182 million population of Pakistan, 38% reside in urban areas having an average growth rate of 1.6%, raising the urban housing demand significantly. Poor state response to fulfil the housing needs has resulted in a mushroom growth of private housing schemes (PHS) over the years. Consequently, only in five major cities of Punjab, there are 383 legal and 150 illegal private housing development projects against 120 public sector housing schemes. A major factor behind the cancerous growth of unapproved PHS is the prolonged and delayed approval process in concerned approval authorities requiring 13 months on average. Currently, manual and paper-based approaches are used for vetting and for granting the permission which is highly subjective and non-transparent. This study aims to design a flexible planning support system (PSS) to optimize the vetting process of PHS projects under any development authority in Pakistan by reducing time and cost required for site and documents investigations. Relying on the review of regulatory documents and interviews with professional planners and land developers, this study describes the structure of a PSS developed using open- source geo-spatial tools such as OpenGeo Suite, PHP, and PostgreSQL. It highlights the development of a Knowledge Module (based on regulatory documents) containing equations related to scheme type, size (area), location, access road, components of layout plan, planning standards and other related approval checks. Furthermore, it presents the architecture of the database module and system data requirements categorized as base datasets (built-in part of PSS) and input datasets (related to the housing project under approval). It is practically demonstrated that developing a customized PSS to optimize PHS approval process in Pakistan is achievable with geospatial technology. With the provision of such a system, the approval process for private housing schemes not only becomes quicker and user-friendly but also

  6. Peruvian projects, privatization proceeding

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Petroleos del Peru is forging ahead on several fronts despite Peru's political turmoil and uncertainty over where government ordered-privatization will take it. The state oil company: is expected to sign contract soon related to development of Chambira oil field in the northern jungle; let contract to a group of Peruvian and Brazilian companies for construction of an oil terminal at Talara on the Pacific coast; and received expressions of interest in participating in an operating contract on an offshore block operated by its Petromar SA offshore subsidiary under the government's privatization program

  7. Peruvian projects, privatization proceeding

    Energy Technology Data Exchange (ETDEWEB)

    1992-10-19

    This paper reports that Petroleos del Peru is forging ahead on several fronts despite Peru's political turmoil and uncertainty over where government ordered-privatization will take it. The state oil company: is expected to sign contract soon related to development of Chambira oil field in the northern jungle; let contract to a group of Peruvian and Brazilian companies for construction of an oil terminal at Talara on the Pacific coast; and received expressions of interest in participating in an operating contract on an offshore block operated by its Petromar SA offshore subsidiary under the government's privatization program.

  8. Criteria for Developing a Successful Privatization Project

    Science.gov (United States)

    1989-05-01

    conceptualization and planning are required when pursuing privatization projects. In fact, privatization project proponents need to know how to...selection of projects for analysis, methods of acquiring information about these projects, and the analysis framwork . Chapter IV includes the analysis. A...performed an analysis to determine cormion conceptual and creative approaches and lessons learned. This analysis was then used to develop criteria for

  9. Application of Systems Engineering to U.S. Department of Energy Privatization Project Selection at the Hanford Nuclear Reservation

    International Nuclear Information System (INIS)

    Layman, John Scott

    1999-01-01

    The privatization efforts at the U.S. Department of Energy's Hanford Nuclear Reservation have been very successful primarily due to a disciplined process for project selection and execution. Early in the development of Privatization at Hanford, the Department of Energy determined that a disciplined alternatives generation and analysis (AGA) process would furnish the candidate projects with the best probability for success. Many factors had to be considered in the selection of projects. Westinghouse Hanford Company was assigned to develop this process and facilitate the selection of the first round of candidate privatization projects. Team members for the AGA process were assembled from all concerned organizations and skill groups. Among the selection criteria were legal, financial and technical considerations which had to be weighed

  10. Tank waste remediation system privatization phase I infrastructure, project W-519, Quality Assurance implementation plan

    International Nuclear Information System (INIS)

    HUSTON, J.J.

    1999-01-01

    This document has been prepared to identify the quality requirements for all products/activities developed by or for Project W-519. This plan is responsive to the Numatec Hanford Corporation, Quality Assurance Program Plan, NHC-MP-001

  11. Fiscal planning of private electricity production projects

    International Nuclear Information System (INIS)

    Gauthier, R.

    2002-01-01

    Various fiscal considerations frequently encountered in the context of the planning of private electricity production projects were described. Two major themes were discussed: 1) the different jurisdictional vehicles that can be used during the planning of private electricity production projects and the associated fiscal considerations, and 2) the two main fiscal incentives of the Income Tax Act (Canada) which could impact on the financing and operation costs of such a project, namely the accelerated amortization and the possibility of deducting the costs associated to renewable energies and energy savings in Canada. This was a general presentation that did not go into specific details and did not represent a legal opinion. refs

  12. PROJECT BONDS IN FINANCING PUBLIC-PRIVATE PARTNERSHIPS IN UKRAINE

    Directory of Open Access Journals (Sweden)

    I. Ovsiannykova

    2014-12-01

    Full Text Available The theoretical principles concerning the financing of public private partnership' projects are deepened and practical recommendations for improving the procedure of raising funds for projects of public-private partnerships through the use project bonds are substantiated.

  13. Private hydropower projects: exporting the american experience

    International Nuclear Information System (INIS)

    Rogers, W.L.; Bourgeacq, J.P.

    1991-01-01

    This paper addresses different aspects of exporting the American knowledge and experience in the private development of small-scale hydropower projects. It details the 'export' and 'adaptation/translation' of American PURPA philosophy to other countries. The major stumbling blocks on the road to exportation are listed. The subject countries'market evaluation is explained, as well as methods for researching and gathering the necessary information on a specific country. Methods of choosing a target country are discussed, and the criteria necessary for making a choice are detailed. The subject of legal framework and privatization of power generation issues overseas and the ways and means to help the 'export of U.S. expertise' through U.S. Government programs are described. The subjects of financing and joint ventures with local entities are also included in this paper. Various scenarios for private development overseas are presented

  14. Why Its Projects Should Be Small, Local And Private

    OpenAIRE

    Weissenberger, Stein

    1998-01-01

    In this paper, the author contends that in order to produce and capture useful knowledge, early Intelligent Transportation Systems (ITS) projects should be local, small, and focused on realistic goals. The importance of cooperative networks that support knowledge acquisition and diffusion is stressed. Additionally, the author promotes the usage of private industry, especially to perform tasks for which they are best qualified.

  15. Private sector in public health care systems

    OpenAIRE

    Matějusová, Lenka

    2008-01-01

    This master thesis is trying to describe the situation of private sector in public health care systems. As a private sector we understand patients, private health insurance companies and private health care providers. The focus is placed on private health care providers, especially in ambulatory treatment. At first there is a definition of health as a main determinant of a health care systems, definition of public and private sectors in health care systems and the difficulties at the market o...

  16. Analysis of debt leveraging in private power projects

    International Nuclear Information System (INIS)

    Kahn, E.P.; Meal, M.; Doerrer, S.; Morse, S.

    1992-08-01

    As private power (non-utility generation) has grown to become a significant part of the electricity system, increasing concern about its financial implications has arisen. In many cases, the source of this concern has been the substantial reliance of these projects on debt financing. This study examines debt leveraging in private power projects. The policy debate on these issues has typically been conducted at a high level of generality. Critics of the private power industry assert that high debt leveraging confers an unfair competitive advantage by lowering the cost of capital, and that this leveraging is only possible because risks are shifted to the utility. Further, debt leveraging is claimed to be a threat to reliability. On the opposite side, it is argued that debt leveraging imposes costs and obligations not home by utilities, and so there is no financial advantage. The private producers also argue that on balance more risk is shifted away from utilities than to them, and that incentives for reliability are strong. In this study we examine the project finance mechanisms used in private power lending in detail, relying on a sample of actual loan documents. This review and its findings should be relevant to the further evolution of this debate. State regulatory commissions are likely to be interested in it, and Federal legislation to amend the Public Utility Holding Company Act (PUHCA) could require states to consider the implications of debt leveraging in relation to their oversight of utility power purchase programs

  17. Analysis of debt leveraging in private power projects

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.P. (Lawrence Berkeley Lab., CA (United States)); Meal, M.; Doerrer, S.; Morse, S. (Morse, Richard, Weisenmiller Associates, Inc., Oakland, CA (United States))

    1992-08-01

    As private power has grown to become a significant part of the electricity system, increasing concern about its financial implications has arisen. In many cases, the source of this concern has been the substantial reliance of these projects on debt financing. This study examines debt leveraging in private power projects. The policy debate on these issues has typically been conducted at a high level of generality. Critics of the private power industry assert that high debt leveraging confers an unfair competitive advantage by lowering the cost of capital. This leveraging is only possible because risks are shifted to the utility. Further, debt leveraging is claimed to be a threat to reliability. On the opposite side, it is argued that debt leveraging imposes costs and obligations not borne by utilities, and so there is no financial advantage. The private producers also argue that on balance more risk is shifted away from utilities than to them, and that incentives for reliability are strong. In this study we examine the project finance mechanisms used in private power lending in detail, relying on a sample of actual loan documents. This review and its findings should be relevant to the further evolution of this debate. State regulatory commissions are likely to be interested in it, and Federal legislation to amend the Public Utility Holding Company Act (PUHCA) could require states to consider the implications of debt leveraging in relation to their oversight of utility power purchase programs.

  18. Managing public-private megaprojects: Paradoxes, complexity and project design

    NARCIS (Netherlands)

    van Marrewijk, A.H.; Clegg, S.R.; Pitsis, T.; Veenswijk, M.B.

    2008-01-01

    Recent studies show that despite their growing popularity, megaprojects - large-scale, complex projects delivered through various partnerships between public and private organisations - often fail to meet costs estimations, time schedules and project outcomes and are motivated by vested interests

  19. Privatization Financing Alternatives: Blending Private Capital and Public Resources for a Successful Project

    Energy Technology Data Exchange (ETDEWEB)

    BT Oakley; JH Holbrook; L Scully; MR Weimar; PK Kearns; R DiPrinzio

    1998-10-19

    The U.S. Department of Energy (DOE) launched the Contract Reform Initiative in 1994 in order to improve the effectiveness and effkiency of managing major projects and programs. The intent of this initiative is to help DOE harness both technical and market forces to reduce the overall cost of accomplishing DOE's program goals. The new approach transfers greater risk to private contractors in order to develop incentives that align contractor performance with DOE's objectives. In some cases, this goal can be achieved through public-private partnerships wherein the govermhent and the contractor share risks associated with a project in a way that optimizes its economics. Generally, this requires that project risks are allocated to the party best equipped to manage and/or underwrite them. While the merits of privatization are well documented, the question of how privatized services should be financed is often debated. Given the cost of private sector equity and debt, it is difficult to ignore the lure of the government's "risk free" cost of capital. However, the source of financing for a project is an integral part of its overall risk allocation, and therefore, participation by the government as a financing source could alter the allocation of risks in the project, diminishing the incentive structure. Since the government's participation in the project's financing often can be a requirement for financial feasibility, the dilemma of structuring a role for the government without undermining the success of the project is a common and difficult challenge faced by policymakers around the world. However, before reverting to a traditional procurement approach where the government enters into a cost-plus risk profile, the government should exhaust all options that keep the private entity at risk for important aspects of the project. Government participation in a project can include a broad range of options and can be applied with precision to bridge a

  20. Improving Sustainability Performance for Public-Private-Partnership (PPP Projects

    Directory of Open Access Journals (Sweden)

    Liyin Shen

    2016-03-01

    Full Text Available Improving sustainability performance in developing infrastructure projects is an important strategy for pursuing the mission of sustainable development. In recent years, the business model of public-private-partnership (PPP is promoted as an effective approach in developing infrastructure projects. It is considered that the distribution of the contribution on project investment between private and public sectors is one of the key variables affecting sustainability performance of PPP-type projects. This paper examines the impacts of the contribution distribution between public and private sectors on project sustainability performance. A model named the sustainability performance-based evaluation model (SPbEM is developed for assisting the assessment of the level of sustainability performance of PPP projects. The study examines the possibility of achieving better sustainability through proper arrangement of the investment distribution between the two primary sectors in developing PPP-type infrastructure projects.

  1. Financing Preference Behaviour for Private Finance Initiative (PFI Projects

    Directory of Open Access Journals (Sweden)

    Yati Md Lasa

    2016-01-01

    Full Text Available Project Financing Initiative (PFI projects require the private sector to invest an enormous amount of capital for the development of public projects. The private sector has to seek cost-effective financing sources for their survival in the long-term concession. Conventional financing uses widely; however, Islamic financing promises better financing through profit and loss sharing. This paper reviews financing preferences for PFI projects and the factors influencing the choice of funding. The results show that religious perspective, quality of services, financing facilities and reputation are the factors that are expected will influence the financing preference behaviour, either Islamic or conventional finance.

  2. Factors Influencing the Private Involvement in Urban Rail Public-Private Partnership Projects in China

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2017-03-01

    Full Text Available Private investors have been encouraged to participate in the development and operation of urban rail projects in China through Public-Private Partnerships (PPPs, given the fact that subnational governments are suffering from urgent development demands and severe fiscal pressure. However, there is no formal assessment to determine the private involvement in a PPP project. This problem is particularly critical in the sector of urban rail, in which the huge investment cannot rely on the private sector alone. This study hence aimed to uncover and identify the influencing factors. Multiple research methods, including content analysis, case study and focus group discussion were adopted to achieve the research purpose. Seven types of influencing factors were identified, including project financial model, government fiscal commitment, risk allocation, public accountability, efficiency considerations, policy and regulations, and organisational marketing strategies. The findings add to the current knowledge base by uncovering the drivers behind private involvement in a PPP project. They are also beneficial for industry practitioners as a basis/checklist to determine the private involvement.

  3. Funding Continuum for Private Business Owners: Evidence from the Pepperdine Private Capital Markets Project Survey

    OpenAIRE

    Maretno A. Harjoto; John K. Paglia

    2011-01-01

    The Pepperdine Private Capital Markets Project survey for business owners, administered during the spring of 2010, reveals an increasingly important role of friends and family (Friends/Family) to provide capital for privately-held businesses. Examining business owners’ perceptions of their sources of capital reveals that, overall, business owners prefer Friends/Family and angel financing as well as asset-based lenders and banks (ABL/Bank). Business owners consider Friends/Family financing to ...

  4. Public private partnership construction project disputes in Nigeria ...

    African Journals Online (AJOL)

    This research examines the possibility of operating a smooth Public Private Partnership (PPP) project for the entire concession period following financial closure, without recourse to litigation or arbitration for settlement of disputes by studying the causes and effects of disputes in construction projects procured in Nigeria ...

  5. Project Management in Development Aid Industry – Public vs. Private

    Directory of Open Access Journals (Sweden)

    Simović Dragana

    2015-02-01

    Full Text Available This article examines the relationship between the type of a development aid implementing organisation (public or private and the quality of project management in development aid. The author begins with main public administration considerations - how public aid administration is different from private and furthermore, how particular sectoral characteristics of organisations influence the quality of the management process. The article combines empirical findings on the differences between the public and private sector with a complex setting of development aid and main success factors in development aid activity, in order to determine whether for-profit or public companies are more likely to achieve better project management processes. The article identifies some indices that favorise private companies, and outlines further necessary steps that should be taken in order to broaden the argumentation and confirm or reject this assertion

  6. Clinical education in private practice: an interdisciplinary project.

    Science.gov (United States)

    Doubt, Lorna; Paterson, Margo; O'Riordan, Anne

    2004-01-01

    Education of rehabilitation professionals traditionally has occurred in acute care hospitals, rehabilitation centres, and other publicly funded institutions, but increasing numbers of rehabilitation professionals are now working in the community in private agencies and clinics. These privately owned clinics and community agencies represent underutilized resources for the clinical training of students. Historically, private practitioners have been less likely to participate in clinical education because of concerns over patient satisfaction and quality of care, workload, costs, and liability. Through a program funded by the Ministry of Health of Ontario, we conducted a series of interviews and focus groups with private practitioners, which identified that several incentives could potentially increase the numbers of clinical placements in private practices, including participation in the development of student learning objectives related to private practice, professional recognition, and improved relationships with the university departments. Placement in private practices can afford students skills in administration, business management, marketing and promotion, resource development, research, consulting, networking, and medical-legal assessments and processes. This paper presents a discussion of clinical education issues from the perspective of private practitioners, based on the findings of a clinical education project undertaken at Queen's University, Kingston, Ontario, and previous literature.

  7. Equitable Financial Evaluation Method for Public-Private Partnership Projects

    Institute of Scientific and Technical Information of China (English)

    KE Yongjian; LIU Xinping; WANG Shouqing

    2008-01-01

    The feasibility study of a public-private partnership (PPP) project is regarded as one of the critical factors for successful implementation,but unfortunately the common financial evaluation methods currently used only represent the benefits of the private sector.There is,therefore,an urgent need to develop an equitable financial evaluation method for PPP projects.This paper presents a comprehensive literature review that examines international practices.An equitable financial evaluation method was then developed taking into account the inherent characteristics of PPP projects using six separate indicators and Monte Carlo simulations.The result for a bridge project in Romania shows that the method combines the viewpoints of all the relevant stakeholders to achieve an equitable financial evaluation of PPP projects.

  8. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  9. United Kingdom electric system privatization

    Energy Technology Data Exchange (ETDEWEB)

    Lolli, A. (Bologna Univ. (Italy))

    1992-03-01

    This paper reviews the mechanics and first results of deregulation in the electric power industry of the United Kingdom. Several aspects are dealt with, namely: 1983 Energy Act impacts on ownership and subsequent changes brought about by the 1989 Energy Act; the Act's stipulations with regard to share acquisition and distribution; the division of the patrimony of the Area Boards; natural monopolistic characteristics of power distribution; vertical integration in Scotland, target investment limits in Government and public participation; the 'golden share' concept to guarantee public participation; current 40% share ownership by the Government; 15% private ownership limit for individual investors; external control by Government of licensing and rate structure setting; the impacts of organizational changes on the overall cost benefits of deregulation; modified Governmental regulatory powers; measures to ensure competition and consumer protection; provisions regarding misbehaviour; second tier suppliers and reserve fuel supply obligations; deregulation impacts on nuclear power marketing; power pooling regulations; installation of new transmission lines; provisions encouraging the use of diverse energy sources; franchising; interconnection with national grid; regulation of technical operations; standby as it affects rate structure; and spot market pricing.

  10. Project management methodology in the public and private sector: The case of an emerging market

    Directory of Open Access Journals (Sweden)

    Azamat Oinarov

    2017-03-01

    Full Text Available Application of project management methodologies in different countries is varied. The preference of a particular methodology largely depends on the specific features of a project management system in use. The aim of the paper is to draw the attention of project-involved readers to the need to develop, not a guide, but a specific project management methodology for projects in the public-private sector. The objective pursued by the paper is to provide useful recommendations for improving the existing methodologies on project management in the public-private sector. Kazakhstan’s experience in implementing project management methodologies in its public sector is sporadic while its private sector uses of modern methodologies build on external investor proven practices. At the background of the low exposure of the public sector to the best of project management methodologies, the paper reviews existing international project management methodologies and develops useful recommendations on the methodology, most suitable for a developing country’s public-private sector, on Kazakhstan’s example.

  11. Real options methodology in public-private partnership projects valuation

    Directory of Open Access Journals (Sweden)

    Rakić Biljana

    2014-01-01

    Full Text Available PPP offers numerous benefits to both public and private partners in delivery of infrastructure projects. However this partnership also involves great risks which have to be adequately managed and mitigated. Private partners are especially sensitive to revenue risk, since they are mostly interested in the financial viability of the project. Thus they often expect public partners to provide some kind of risk-sharing mechanism in the form of Minimum Revenue Guarantees or abandonment options. The objective of this paper is to investigate whether the real option of abandoning the project increases its value. Therefore the binominal option pricing model and risk-neutral probability approach have been implemented to price the European and American abandonment options for the Build-Operate-Transfer (BOT toll road investment. The obtained results suggest that the project value with the American abandonment option is greater than with the European abandonment option, hence implying that American options offer greater flexibility and are more valuable for private partners. [Projekat Ministarstva nauke Republike Srbije, br. 179066 and III 42006

  12. Restaurant Management System Over Private Network

    Directory of Open Access Journals (Sweden)

    Amanat Dhillon

    2017-08-01

    Full Text Available Restaurant Management System over Private Network is an automated business environment which allows restaurants to reduce operational costs increase efficiency of business improve customer satisfaction cut down labour costs decrease order processing time and provide better Quality-of-ServiceQ-S. This system manages a digital menu allowing the customers to place orders easily. Authentication fields for employees enable better administration of the restaurant. The whole restaurant is integrated into one private network thereby improving security and eliminating the need for a constant internet connection.

  13. Performance Assessment Framework for Private Finance Initiative Projects in Malaysia

    Directory of Open Access Journals (Sweden)

    Lop Nor Suzila

    2016-01-01

    Full Text Available Private Finance Initiative (PFI is viewed as restructuring the previous privatisation concept in delivering value for money for the Malaysian public infrastructure. Among the restructuring efforts in the privatisation is specifying the standard assessment of private concessionaires’ performance through the execution of key performance indicators (KPIs where the private concessionaires’ performance is benchmarked against the government’s standard. KPIs have served as useful tools in assessing performance of PFI projects. However, there is still lacking on determination methods performed to define and measure this KPIs and the absence of guidelines or a framework is also an issue in the implementation of the PFI procurement in Malaysia. Therefore, the objectives of this paper is to investigate the notion of performance assessment model approaches globally (i.e. UK, China, Australia, Serbia and Malaysia and to identify direction for PFI performance assessment tools (KPIs to be practiced in Malaysia. Based on the consideration of these models, this research paper propose an initial framework of performance assessment for PFI projects in Malaysia. The framework is deliberate to cover the performance of PFI at the operation and maintenance phase. The outcomes of this paper can serve as a theoretical base for the development of comprehensive and effective performance assessment for PFI projects in Malaysia.

  14. Restaurant Management System Over Private Network

    OpenAIRE

    Amanat Dhillon; Shreya Tuli

    2017-01-01

    Restaurant Management System over Private Network is an automated business environment which allows restaurants to reduce operational costs increase efficiency of business improve customer satisfaction cut down labour costs decrease order processing time and provide better Quality-of-ServiceQ-S. This system manages a digital menu allowing the customers to place orders easily. Authentication fields for employees enable better administration of the restaurant. The whole restaurant is integrated...

  15. Privatizing government operations - a systems approach

    International Nuclear Information System (INIS)

    Duffy, M.A.; Sailor, W.C.; Schmieman, E.A.; Baker, L. Jr.

    1996-01-01

    The Hanford Area is a U.S. Department of Energy (DOE) reservation in Southeastern Washington, where the primary mission for nearly fifty years was production of nuclear weapons materials. It is now the nation's largest superfund site and its sole mission is environmental remediation of the mixed wastes generated during plutonium production. A large fraction of these wastes are stored in 177 underground tanks and are the subject of the DOE's Tank Waste Remediation system (TWRS) Program. Since its inception the TWRS Program has been managed by a Maintenance and Operations (M ampersand O) contractor. The DOE is now considering the privatization of a portion of this program and has recently issued a Request for Proposals (RFP) seeking new, qualified, private vendors. Successful bidders will be expected to build waste processing facilities with their own financial resources and to recover their costs by charging fixed prices for the various products delivered to the DOE. Because the TWRS Program is such a large, complex, and expensive undertaking, the privatization initiative will be conducted in two phases: a small proof-of-concept phase, followed by full-scale production. The key to a successful demonstration is establishing the right set of requirements to be satisfied by the private vendors. These requirements must be consistent with the existing requirements set developed over the past three years by the M ampersand O contractor. This paper presents the results of a systems engineering effort that was conducted in support of the RFP preparation and had to be coordinated with an ongoing program. Much of the effort was focused on the specification of new proof-of-concept requirements that are directly traceable to corresponding requirements in the M ampersand O's RDD-100 reg-sign database. A new functions and requirements database was created for this first privatization phase using CORE reg-sign, a systems engineering support tool, produced by Vitech Corporation

  16. Kenya geothermal private power project: A prefeasibility study

    Energy Technology Data Exchange (ETDEWEB)

    1992-10-01

    Twenty-eight geothermal areas in Kenya were evaluated and prioritized for development. The prioritization was based on the potential size, resource temperature, level of exploration risk, location, and exploration/development costs for each geothermal area. Suswa, Eburru and Arus are found to offer the best short-term prospects for successful private power development. It was found that cost per kill developed are significantly lower for the larger (50MW) than for smaller-sized (10 or 20 NW) projects. In addition to plant size, the cost per kill developed is seen to be a function of resource temperature, generation mode (binary or flash cycle) and transmission distance.

  17. TWRS privatization support project waste characterization database development. Volume 1

    International Nuclear Information System (INIS)

    Brevick, C.H.

    1995-11-01

    Pacific Northwest National Laboratory requested support from ICF Kaiser Hanford Company in assembling radionuclide and chemical analyte sample data and inventory estimates for fourteen Hanford under-ground storage tanks: 241-AN-102, -104, -105, -106, and -107, 241-AP-102, -104, and -105; 241-AW-101, -103, and -105, 241-AZ-101 and-102; and 241-C-109. Sample data were assembled for sixteen radio nuclides and thirty five chemical analytes. The characterization data were provided to Pacific Northwest National Laboratory in support of the Tank Waste Remediation Services Privatization Support Project. The purpose of this report is to present the results and document the methodology used in preparing the waste characterization information data set to support the Tank Waste Remediation Services Privatization Support Project. This report describes the methodology used in assembling the waste characterization information and how that information was validated by a panel of independent technical reviewers. Also, contained in this report are the various data sets created., the master data set, a subset, and an unreviewed data set

  18. Exploring the private finance initiative as a route to finance for renewable energy projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    This report reviews the private financing of public sector Renewable Energy projects through the Private Finance Initiative (PFI), and the relevance of such a technique to the renewables industry generally. (author)

  19. TWRS privatization support project waste characterization database development

    International Nuclear Information System (INIS)

    1995-11-01

    Pacific Northwest National Laboratory requested support from ICF Kaiser Hanford Company in assembling radionuclide and chemical analyte sample data and inventory estimates for fourteen Hanford underground storage tanks: 241-AN-102, -104, -105, -106, and -107, 241-AP-102, -104, and -105, 241-AW-101, -103, and -105, 241 AZ-101 and -102; and 241-C-109. Sample data were assembled for sixteen radionuclides and thirty-five chemical analytes. The characterization data were provided to Pacific Northwest National Laboratory in support of the Tank Waste Remediation Services Privatization Support Project. The purpose of this report is to present the results and document the methodology used in preparing the waste characterization information data set to support the Tank Waste Remediation Services Privatization Support Project. This report describes the methodology used in assembling the waste characterization information and how that information was validated by a panel of independent technical reviewers. Also, contained in this report are the various data sets created: the master data set, a subset, and an unreviewed data set. The master data set contains waste composition information for Tanks 241-AN-102 and -107, 241-AP-102 and -105, 241-AW-101; and 241-AZ-101 and -102. The subset contains only the validated analytical sample data from the master data set. The unreviewed data set contains all collected but unreviewed sample data for Tanks 241-AN-104, -105, and -106; 241-AP-104; 241-AW-103 and-105; and 241-C-109. The methodology used to review the waste characterization information was found to be an accurate, useful way to separate the invalid or questionable data from the more reliable data. In the future, this methodology should be considered when validating waste characterization information

  20. Hydropower projects financing through the public private partnership a future powered by hydro

    International Nuclear Information System (INIS)

    Oprea, Traian; Teleanu, Mihai; Dobrescu, Dan

    2004-01-01

    .5-4.0 GWh / 1 million Euro investment; - Debt report: equity set up at 80:20 % (one can prove an influence in price increase by 6-7 % if the report is fixed at 70:30 %); - Credit recovery period (debt) should not be lower than 12 years, with 3 years of grace period for construction, but 15 years for 'pay back' is recommendable; - The soft costs vs. hard costs report in the financial arrangement should be at most 25:75 %, but 15:85 is recommendable; - The loan interest should be fixed and not exceed LIBOR + 2 - 3 points; - ROE should not exceed 16-18 %; - A general contractor with experience in the hydro construction field and with solid bank guarantees ought to be hired for the EPC contract. Under these circumstances there one can finalize hydro projects through the project finance system. In order that the action of attracting private capital is successful, in any case it is primordial that it is strong support for behalf of the government to unfurl a public -private partnership project. The integral capitalization of the hydropower potential by building new hydroelectric plants - that implies in most of the cases as well as dam construction - represents on a long term for Romania both a condition of development and a prosperity source

  1. Public Private Partnerships: A possible alternative for delivery of infrastructure projects in Africa

    OpenAIRE

    Salim Bwanali; Pantaleo Rwelamila

    2017-01-01

    It is estimated that Africa needs $93 billion annually until 2020 in order to bridge its infrastructure deficit. It is through significant investment in infrastructure development that economic growth and poverty alleviation can be enhanced. However central to all construction projects is an effective and sustainable procurement system. There is a notable shift by some African governments to turn to the private sector to design, build, finance and operate infrastructure facilities previously ...

  2. The Compensation and Benefits System: Private Companies vs. Budgetary System

    Directory of Open Access Journals (Sweden)

    Aldea Bogdan

    2015-12-01

    Full Text Available The economic evolution of the last decades has entailed major changes concerning the Human Resource Management practices, in both private and budgetary sector of Romania. In order to maintain efficiency and market competitivity, a company must adapt to these changes by altering its human resource strategy since managers are encountering increasingly complex challenges as to attracting, motivating and retaining employees. Such an objective might be accomplished by elaborating a competitive system of employee compensation. This article focuses on the stage reached by the Human Resource Management in the compensation and benefits system of the private and budgetary sector. For the latter, we are focusing on the romanian system of higher education. This study demonstrates that the compensation and benefits system which is implemented in romanian universities is limited and can offer few opportunities as compared to the one implemented by private companies. It is worth saying that the legal system has a negative impact in this matter.

  3. Private Electronic Money, Fiat Money and the Payments System

    OpenAIRE

    Andrew B. Whinston; Paula Hernandez-Verme; Haibo Huang

    2004-01-01

    Temzelides and Williamson (2001) provides valuable contribution into the private money literature, however, as pointed out by Schreft (2001), while the model provides insight about historical experiences with private paper monies, it does not provide a clear insight on how a modern system of private electronic money would work and how the necessary network shall function. Our target of this paper is to fill in that gap. We present a model with two types of private electronic currencies with o...

  4. TRANSACTIONAL LEADER IN ROMANIAN PRIVATE BANKING SYSTEM

    Directory of Open Access Journals (Sweden)

    Lucian Ciprian CRIȘAN

    2016-05-01

    Full Text Available From a managerial point of view, all the media means of professional communication, socialization and interaction emphasize entrepreneurial success stories. One of the modern concerns of all current researchers is to underline the place and role of leaders in the institutional framework. The leadership is perceived as a support pillar in maintaining any business. The analysis of this phenomenon is extremely extensive, starting with the culture of a company, the purpose of its existence and comprises aspects concerning the employees motivation and the degree of identifying themselves with the organizational objective. A constant concern in analyzing this phenomenon is retaining the employees and encouraging them to bring added value to the organization where they perform their daily activities. Nevertheless, the Romanian banking system in Timişoara seems to display a strong resistance towards change. The leadership of this industry is comprised of people with great managerial abilities. The transactional method, manifested by the leader in the Romanian private banking system in Timişoara, seems to be the main phenomenon at the basis of their daily activity. The manager – leader hypothesis is slowly taking shape. Due to the resistance to change, generated by the educational model, from a managerial point of view, the balance is strongly tilting towards the managerial traits at the expense of the leadership ones. We are still at the stage where the tolerance towards liberty, uncertainty, are some of the traits of the leader in the Romanian private banking system in Timişoara, which are poorly identified at the management level of this very important segment of activity.

  5. Balancing between feasibility and relationship : Interventions to prevent dysfunctionality of conflict in public private partnership projects

    NARCIS (Netherlands)

    Lousberg, L.H.M.J.

    2011-01-01

    Research shows that there are many bottle-necks in Public Private Partnership (PPP) Projects in Dutch spatial development. Due to the specific properties of Public Private Partnerships, these bottle-necks can lead to dysfunctional conflicts which are damaging the project. Hence the question is: how

  6. Private sector financing of projects - implementation of the BAKUN hydroelectric project in Malaysia; Private Projektfinanzierung - Errichtung der Wasserkraftanlage Bakun in Malaysia

    Energy Technology Data Exchange (ETDEWEB)

    Failer, E. [Lahmeyer International GmbH, Frankfurt am Main (Germany)

    1998-07-01

    The BAKUN Hydroelectric Power Project in Malaysia represents, alongside the Three Gorges Project in China, one of today's most closely observed hydropower projects. The Bakun Project features a generating capacity of 2 520 MW, a 205 m high concrete face rockfill dam and a 1 320 km long power transmission system from Sarawak (Borneo) to West Malaysia. Implementation costs are estimated at around DM 10 000 million. In December 1996 the concession to construct and operate the Bakun Project for a period of 30 years on a BOT (build-operate-transfer) basis was granted to the Bakun Hydro-Electric Corporation, a private project development company. A US-Dollar million contract was awarded one year prior to this concession, to construct the river diversion works in advance. Completion of the three concrete-lined diversion tunnels, each with an inner diameter of 12 m, is scheduled for the end of 1998. After a brief overview of the Bakun Project, the paper describes a typical structure of the parties involved and the legal framework for BOT project finance. The most important features of the concession agreement, the power purchase agreement (PPA) and the engineering, procurement and construction (EPC) contract are explained. Finally, the paper emphasizes that in future the water resources engineer will have to be more involved with topics such as fixed-price contracts, risk management, turnkey solutions and project finance. (orig.) [German] Mit einer geplanten installierten Leistung von 2 520 MW, einem 205 m hohen Steinschuettdamm mit Betonoberflaechendichtung, einem 1 320 km langen Energieuebertragungssystem von Sarawak (Borneo) nach Westmalaysia und mit Projektkosten von ca. 10 Mrd. DM stellt das BAKUN-Wasserprojekt in Malaysia, neben dem Dreischluchtenprojekt in China, eines der meist beachteten Wasserkraftprojekte der Gegenwart dar. Im Dezember 1996 erhielt die private Projektentwicklungsgesellschaft 'Bakun Hydro-Electric Corporation' die Konzession, das

  7. Stockholders' interests in the energy system privatization

    International Nuclear Information System (INIS)

    Matei, Magdalena; Matei, Lucian

    2004-01-01

    The paper highlights the benefits and objectives of competition and privatization in the power sector. The reasons for electric utility privatization are numerous and vary from country to country. Some of the more evident reasons include the following: - Raising revenues for the state through asset sales; - Acquiring investment capital; - Improving managerial performance; - Moving toward market-determined prices; - Technology transfer; - Reducing the frequency of power shortages; - Reducing the cost of electricity to consumers through efficiency gain; - Taking advantage of creating national and regional power grids. Several objectives commonly associated with privatization, includes: - Improving access to private capital resources for the rehabilitation, replacement and eventual expansion of the electric power infrastructure; - Improving access to new technology and management practices designed to improve the performance of the sector; - Reducing corruption through the introduction of commercial practices which will lead to strengthened collections, transparent and accountable delivery of electricity and reduced political interference in commercial operations; - Improving customer service and customer choice through continued reform of the power sector as a result of innovation and reform introduced by the new owners; - Human resources development; - Improving environmental performance . The paper addresses the following items: - Some elements of a successful power sector privatization; - Stockholders' position versus privatization in Romania; - Managing 'The Change'; - Power sector privatization in Romania. The paper demonstrates that the power sector privatization is a key condition for EU's support for Romania accession. The international organization push towards this essential economic change, which will guarantee a real competition and a liberalized energy market in facto. Strategic privatization can be a positive step in improving energy service and

  8. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    International Nuclear Information System (INIS)

    Honeyman, J.O.

    1998-01-01

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined

  9. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    International Nuclear Information System (INIS)

    Certa, P.J.

    1998-01-01

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined

  10. Public Private Partnerships: A possible alternative for delivery of infrastructure projects in Africa

    Directory of Open Access Journals (Sweden)

    Salim Bwanali

    2017-12-01

    Full Text Available It is estimated that Africa needs $93 billion annually until 2020 in order to bridge its infrastructure deficit. It is through significant investment in infrastructure development that economic growth and poverty alleviation can be enhanced. However central to all construction projects is an effective and sustainable procurement system. There is a notable shift by some African governments to turn to the private sector to design, build, finance and operate infrastructure facilities previously provided by the public sector in the form of Public Private Partnerships (PPP’s. As an innovative financing model, PPPs present an opportunity to governments to improve service delivery. Accordingly, this paper focuses on assessing international best practices as to how some developing nations tap into the resources of the private sector in implementing their infrastructure projects. The study is a result of critical review, synthesis and contextualization of relevant academic literature, conference and journal publications. A thorough document review method was employed to assess how some developing countries have institutionalized PPP as part of their development strategy. The paper will be of significant value to senior government officials as understanding the concept and dynamics of PPP will result in accelerated and effective service delivery.

  11. Comparing Performance of Government and Private Clients in Construction Projects: Contractors’ Perspective

    OpenAIRE

    Jati Utomo Dwi Hatmoko; Riqi Radian Khasania

    2016-01-01

    By nature, government and private projects have different characteristics, which influence client performance. This research aims to compare performance of government and private clients in construction projects as perceived by contractors. Six client performance indicators were used, i.e. understanding of project requirements, financial, decision making, management skills, supports for contractor, and client’s attitude. Data were collected through questionnaire surveys filled in by 117 respo...

  12. Bundling the procurement of sports infrastructure projects : How neither public nor private actors really benefit

    NARCIS (Netherlands)

    van den Hurk, M.

    2016-01-01

    Public-private partnerships for infrastructure development are often conceived as puzzling governance tools. A peculiar case in Belgium has been the procurement of multiple similar projects to single private sector partners who design, build, finance and maintain infrastructure for a fixed

  13. Comparing private label and manufacturer brand innovation projects in a Dutch food processing company

    NARCIS (Netherlands)

    Omta, S.W.F.; Fortuin, F.T.J.M.

    2014-01-01

    The time when private labels consisted only of low-priced, low-quality products has long gone. A new type of cooperative innovation project has emerged in which food processors and retailers work closely together to target consumers with new and innovative products. These so-called high-end private

  14. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  15. Health Management Information System in Private Clinics in Ilorin ...

    African Journals Online (AJOL)

    This descriptive survey was conducted among private clinics located in Ilorin, Kwara State, Nigeria to determine the awareness and level of involvement of private clinic operators towards the National Health Management Information System. A total of 37 functional clinics responded to the survey. Structured questionnaire ...

  16. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  17. Public-private partnerships in urban regeneration projects: Organizational form or managerial capacity?

    NARCIS (Netherlands)

    M.B. Kort (Michiel); E-H. Klijn (Erik-Hans)

    2011-01-01

    markdownabstract__Abstract__ Urban regeneration companies (URCs) are public-private entities appearing across Europe. They are created specifically to manage and implement more effectively urban regeneration projects. Core ideas behind the establishment of these newly emerging partnerships aim to

  18. EVALUATION OF EFFICIENCY OF FINANCING TRANSPORT INFRASTRUCTURE PROJECTS REALIZED IN THE FRAMEWORK OF PUBLIC PRIVATE PARTNERSHIP

    Directory of Open Access Journals (Sweden)

    S. B. Vasiliev

    2015-01-01

    Full Text Available The article examines the basic approach to evaluating efficiency of financing transport infrastructure projects realized in the framework of public private partnership. The main ways of the project realization are identified, and their main advantages and disadvantages are described. Detailed elaboration and structuring of infrastructure projects are grounded.

  19. The development of public and private construction procurement systems in the Malaysian construction industry

    Directory of Open Access Journals (Sweden)

    Mastura Jaafar

    2012-12-01

    Full Text Available As demand on building construction projects rises, various procurement methods have been adapted to suit with unique project requirements. However, poor industry performance and rapid developments within it indicate the need for a research on the procurement systems in the industry. In order to explore the development of procurement systems in Malaysia, a discussion on different economic phases which influence the routes of procurement systems and its evolution in Malaysia's construction industry is initiated. Subsequently, based on a questionnaire survey collected from 73 public and 68 private parties, the significant and dominant role of traditional procurement system used by both the public and private sectors in Malaysia can be confirmed. Further, compared to the public sector, the private sector is observed to be more aggressive in adapting alternative systems such as design and build (D&B and Turnkey. Further elaboration on the research findings is covered in the discussion section.

  20. TWRS privatization phase 1 electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    This document includes Conceptual Design Report (CDR) for a new 11 km (7 miles) 230 kV transmission line and a new 40 MVA substation (A6) which will be located east of Grout Facility in 200E Area tank farm. This substation will provide electrical power up to 20 MW each for two private contractor facilities for immobilization and disposal of low activity waste (LAW)

  1. Comparing Performance of Government and Private Clients in Construction Projects: Contractors’ Perspective

    Directory of Open Access Journals (Sweden)

    Jati Utomo Dwi Hatmoko

    2016-09-01

    Full Text Available By nature, government and private projects have different characteristics, which influence client performance. This research aims to compare performance of government and private clients in construction projects as perceived by contractors. Six client performance indicators were used, i.e. understanding of project requirements, financial, decision making, management skills, supports for contractor, and client’s attitude. Data were collected through questionnaire surveys filled in by 117 respondents. The results show that there is a significant difference between both types of client performance. Three variables related to financial indicators, i.e. timely payment, owner value estimate, and payment approval, rank in the bottom three of the government client performance, but in contrast rank in the top three of the private ones. These results suggest that the government clients’ performance is perceived inferior to the private ones. Establishing a clients’ forum for sharing knowledge and best practices would be a strategic solution to enhance clients’ capacities.

  2. Risk and mitigation in the privately financed hydropower project Birecik, Turkey; Privat finanzierte Wasserkraft, Birecik, Tuerkei - Risiken und Risikoverteilung

    Energy Technology Data Exchange (ETDEWEB)

    Koselleck, F.; Ishay, D. [PH Ventures GmbH, Neu-Isenburg (Germany)

    2003-07-01

    The 627 MW Hydroelectric Power Plant Birecik, Turkey, is the largest privately financed hydropower project realized wordwide under a BOT (Build Operate Transfer) scheme. The total investment volume adds up to almost 1 Bll Euro. Ther financial structure of the project mostly relies on export credits, which have been arranged under an international consortium of 50 banks. A complex contractual structure between the government, the investors and the contractors succeeded in establishing a fair risk mitigation mechanism, which was a central factor for the overall success of the project. [German] Das 672 MW Wasserkraftwerk Birecik, Tuerkei, ist mit einem Investitionsvolumen von rund Euro 1 Mrd. das bisher weltweit groesste Wasserkraftprojekt, das nach dem BOT-Modell realisiert wurde. Die auf Exportkredite basierende Finanzierung wurde ueber ein internationales Konsortium von 50 Banken dargestellt. Eine komplexe Vertragsstruktur zwischen dem Staat, den Investoren und den Auftragsnehmern fuehrte zu einem ausgeglichenen Risikoverteilungsmechanismus, der ausschlaggebend fuer den Erfolg des Projektes war. (orig.)

  3. Exploring the influence of external actors on the cooperation in public–private project organizations for constructing infrastructure

    NARCIS (Netherlands)

    Koops, L.S.W.; Bosch-Rekveldt, M.G.C.; Bakker, H.L.M.; Hertogh, M.J.C.M.

    2017-01-01

    Though different forms of public–private partnerships exist, in the organizational structure of most forms a public and a private project organization can be derived, resulting in two collaborating project organizations. The literature on project management however mostly considers one project

  4. Private Sector-led Urban Development Projects : Management, Partnerships & Effects in the Netherlands and the UK

    NARCIS (Netherlands)

    Heurkens, E.W.T.M.

    2012-01-01

    Subject of study is Private Sector-led Urban Development Projects. Such projects involve property developers taking a leading role and local authorities adopting a facilitating role in the management of the development of an urban area, based on a framework of public requirements and a formal

  5. A Conflict’s Impact on Project Goals and Reputation Risk : Lessons from Kosovo Privatization Program

    OpenAIRE

    Bach, Karl

    2008-01-01

    When designing and implementing a project in a conflict-affected country, some of the conflict's more obvious impacts-damage to infrastructure and energy supplies, are apt to immediately come to mind. However, based on the experiences with the Kosovo privatization program, there are additional problems related to a conflict's aftermath that may be overlooked during a project's design but w...

  6. Project Selection and Transparency Factors in Housing Public-Private Partnerships in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2018-06-01

    Full Text Available The application of Public-Private Partners (PPPs in housing provisioning is on the increase across the world. However, there is a paucity of empirical studies on the specific factors considered at the initiation, and measures taken to ensure transparency at the procurement stages, of PPP housing projects. This study examined project selection factors and transparency measures in PPP housing projects using data sourced from oral interviews with 27 experts in nine PPP housing schemes in Nigeria. Results of the content analysis revealed that the top two selection factors considered by both the public and private sector operators of PPP housing projects in Nigeria are the availability of land and viability of the funding arrangements. Whereas the public-sector partners also consider the availability of competent private sector to deliver the projects, the private developers are concerned with the location of proposed projects. It was also found that the two key measures taken to ensure transparency at the procurement stage of the projects are transparent and competitive bidding and open advertisements of tender opportunities. These imply that before embarking on PPP housing projects, operators should ensure that there is available land in good locations, sound funding arrangements, and measures for achieving transparency in the schemes.

  7. Critical Success Factors of Public-Private-Partnership Projects in ...

    African Journals Online (AJOL)

    , to identify their relative importance in promoting good governance. Data obtained from experienced professionals and clients in PPP projects were critically analysed using influence index value. A total of 26 constraints and 12 CSFs were ...

  8. Private Sector-led Urban Development Projects. Management, Partnerships and Effects in the Netherlands and the UK

    Directory of Open Access Journals (Sweden)

    Erwin Heurkens

    2012-09-01

    adoption of Anglo-Saxon principles in Dutch society. Despite its Rhineland roots with a focus on welfare provision, in the Netherlands several neoliberal principles (privatization, decentralization, deregulation have been adopted by government and incorporated in the management of organizations (Bakker et al., 2005. Hence, market institutionalization on the one hand, and rising civic emancipation on the other, in current Western societies prevents a return towards hierarchical governance. Second, the result of such changes is the emergence of a market-oriented type of planning practice based on the concept of ‘development planning’. Public-Private Partnerships and the ‘forward integration’ of market parties (De Zeeuw, 2007 enforce the role of market actors. In historical perspective, Boelens et al. (2006 argue that Dutch spatial planning always has been characterized by public-private collaborations in which governments facilitated private and civic entrepreneurship. Therefore, post-war public-led spatial planning with necessary government intervention was a ‘temporary hiccup’, an exception to the rule. Third, the European Commission expresses concerns about the hybrid role of public actors in Dutch institutionalized PPP joint ventures. EU legislation opts for formal public-private role divisions in realizing urban projects based on Anglo-Saxon law that comply with the legislative tendering principles of competition, transparency, equality, and public legitimacy. Fourth, experiences with joint ventures in the Netherlands are less positive as often is advocated. Such institutionalized public-private entities have seldom generated the assumed added value, caused by misconceptions about the objectives of both partners grounded in incompatible value systems. This results in contra-productive levels of distrust, time-consuming partnership formations, lack of transparency, and compromising decision-making processes (Teisman & Klijn, 2002, providing a need for other

  9. Health System Measurement Project

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Health System Measurement Project tracks government data on critical U.S. health system indicators. The website presents national trend data as well as detailed...

  10. To develop a public private partnership model of disease notification as a part of integrated disease surveillance project (IDSP for private medical practitioners in Mumbai City, India

    Directory of Open Access Journals (Sweden)

    Ratnendra R. Shinde

    2013-01-01

    Full Text Available Background The main objective of Integrated Disease Surveillance Project (IDSP was early detection of disease outbreaks. This could be possible only when the public health authorities have a strong and effective surveillance system in collaboration with Private Health Sector. Objectives 1 To assess knowledge, attitude & practice about notification of diseases amongst Private Medical Practitioners (PMPs. 2 To find out barriers experienced by PMPs in reporting of diseases under surveillance. 3 To assess feasibility of various alternative ways of reporting convenient for PMPs. 4 To develop a Public Private Partnership Model of disease notification based on feasible options obtained in the study. Materials and Methods This study was a cross-sectional descriptive study conducted in the F South Municipal ward of Mumbai city during April-May 2011. Two stage simple random sampling was used to select 104 PMPs for the study. Results and Conclusions Nearly 98% PMPs felt importance of notification in health system, but only 46% had practiced it. Most common reason for non-reporting was lack of information about reporting system. The convenient way of reporting for PMPs was to report to the nearest health post personally or to District Surveillance Unit through SMS/phone call and both at weekly interval.

  11. How to create a public-private partnership: a replicable project associated with business continuity.

    Science.gov (United States)

    Hahn, Daniel

    2010-07-01

    In an age of political turmoil and mistrust of governments, having an outlet for creative problem solving that involves all aspects of communities during disasters is critical. Additionally, there is a need for outlets that save taxpayer money for particular projects, such as road construction or infrastructure protection. Public-private partnerships are one way to accomplish these goals. Utilised correctly, a public-private partnership is a win-win situation for all participants. This paper will make the case for the continued support from all sectors for public-private partnerships. A description of public-private partnerships will be given to show the broad spectrum of opportunities for such a partnership. In addition, a case study of a public-private partnership called SAFER Santa Rosa is explored as the programme is oriented towards disasters, but keeps the community engaged all year round. Finally, an example is presented of an initiative that not only exemplifies the spirit of public-private partnerships, but has attracted international recognition because it is simple, replicable, cost-effective and valuable to both the private sector and the public sector. The Business Emergency Response Toolkit bag is a true public-private success story. It is hoped that the reader will be able to replicate the ideas discussed herein in their own community.

  12. Review of issues and challenges for public private partnership (PPP) project performance in Malaysia

    Science.gov (United States)

    Hashim, H.; Che-Ani, A. I.; Ismail, K.

    2017-10-01

    Public Private Partnership (PPP) in Malaysia aims to stimulate economic growth and overcome the weakness of conventional system. Over the years, many critics have been reported along the massive growth of PPP project development. Within that context, this study provides a review of issues and challenges for PPP pertaining to project performance in Malaysia. The study also attempts to investigate four performance measurement models around the globe as a basis for improvement of PPP in Malaysia. A qualitative method was used to analyse literature review from previous published literatures while comparative analysis was carried out within the models to identify their advantages and disadvantages. The findings show that the issues and challenges occurred were related to human, technical and financial factor that could hinder the implementation of PPP project in Malaysia. From the analysis, KPIs, guideline / framework, risk allocation, efficiency & flexibility are perceived as dominant issues. Finally, the findings provide an informed basis on the opportunity areas to be considered for improvement in order to achieved project effectiveness.

  13. Determination of the optimal proportions of public and private funds in project budget management

    Science.gov (United States)

    Pykhtin, Kirill; Simankina, Tatyana; Karmokova, Kristina; Zonova, Alevtina

    2017-10-01

    Although the historical period of public-private partnership in the Russian federation is rather short, yet this type of cooperation of private entrepreneurs and authorities became the major driver of growth in such areas as construction, utilities, infrastructure and energetics. However, even though the experience of foreign countries is much larger than of Russia, great number of human resources are still consumed within disputes and disquisitions in order to assess the ratio of private and public funds. The present paper is based on the idea that this ratio can be determined for each of the industries with the use of statistical data. The authors offered the change in project cost range within the project classification regarding to the “project scale” characteristic.

  14. Private capital requirements for international biomass energy projects

    Energy Technology Data Exchange (ETDEWEB)

    Goldemberg, J [University of Sao Paulo, Sao Paulo (Brazil)

    1995-12-01

    In developing countries, the use of biomass for energy production faces two contradictory pressures. On the one hand, biomass costs very little and it is used inefficiently for fuel or charcoal production, leading to widespread destruction of forested areas and environmental degradation; this problem is being attenuated by the promotion, through aid programmes, of more efficient cook stoves for poor people. On the other hand, the conversion of biomass into high-grade fuel such as ethanol from sugar cane or burning urban refuse or gasifying it to produce electricity is not economically competitive at this time and requires subsidies of approximately 30% to make it as attractive as conventional fuels. Only electricity production using residues from sawmills, crops and other biomass by-products is competitive, and a number of plants are in operation in some countries, particularly the United States. For such plants, the usual rates of return and long-term contract purchases that characterize investments of this kind are applied. Although technologies are available for the widespread efficient use of biomass, the financial hurdle of high initial costs has impeded their market penetration, which in turn precludes any decline in costs that might otherwise have come from production increases. Intervention by governments or by GEF, justified on grounds of environmental protection, is needed to accelerate the introduction of the new technologies. The only private flows that are taking place at the moment are those from enlightened investors wishing to guarantee themselves a strong position in the area for the future or to preempt command and control regulations, such as carbon taxes, imposed by governments. The joint implementation of biomass technologies between industrialized and developing countries might be one method of accelerating this flow. (author) 9 refs, 4 figs, 3 tabs

  15. Private capital requirements for international biomass energy projects

    International Nuclear Information System (INIS)

    Goldemberg, J.

    1995-01-01

    In developing countries, the use of biomass for energy production faces two contradictory pressures. On the one hand, biomass costs very little and it is used inefficiently for fuel or charcoal production, leading to widespread destruction of forested areas and environmental degradation; this problem is being attenuated by the promotion, through aid programmes, of more efficient cook stoves for poor people. On the other hand, the conversion of biomass into high-grade fuel such as ethanol from sugar cane or burning urban refuse or gasifying it to produce electricity is not economically competitive at this time and requires subsidies of approximately 30% to make it as attractive as conventional fuels. Only electricity production using residues from sawmills, crops and other biomass by-products is competitive, and a number of plants are in operation in some countries, particularly the United States. For such plants, the usual rates of return and long-term contract purchases that characterize investments of this kind are applied. Although technologies are available for the widespread efficient use of biomass, the financial hurdle of high initial costs has impeded their market penetration, which in turn precludes any decline in costs that might otherwise have come from production increases. Intervention by governments or by GEF, justified on grounds of environmental protection, is needed to accelerate the introduction of the new technologies. The only private flows that are taking place at the moment are those from enlightened investors wishing to guarantee themselves a strong position in the area for the future or to preempt command and control regulations, such as carbon taxes, imposed by governments. The joint implementation of biomass technologies between industrialized and developing countries might be one method of accelerating this flow. (author)

  16. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    International Nuclear Information System (INIS)

    ROOT, R.W.

    1999-01-01

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems

  17. 23 CFR 636.119 - How does this part apply to a project developed under a public-private partnership?

    Science.gov (United States)

    2010-04-01

    ... public-private partnership? 636.119 Section 636.119 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT... does this part apply to a project developed under a public-private partnership? (a) In order for a... Federal-aid procurement procedures will depend on the nature of the public-private agreement. (1) If the...

  18. Public-Private Partnerships and Sustainable Regional Innovation Systems

    DEFF Research Database (Denmark)

    Lehmann, Martin; Christensen, Per; Johnson, Bjørn

    -private partnerships. The role of universities if and when actively participating in ‘life outside the ivory tower’ is addressed. These partnerships are also discussed in a regional context. With point of departure in innovation theory, we combine ‘sustainable development’ with the Regional System of Innovation...... approach to propose a new concept – Sustainable Regional Innovation System – in which regional initiatives such as Public-Private(-Academic) Partnerships play an integrated role, not least in the context of ‘learning and innovation for sustainable development’. Two cases are presented to underline...... be playing in public-private partnerships for sustainable development, and the links and benefits this may provide towards universities fulfilling their first (science) and second (education) missions. In this paper, the first part is dedicated to the discussion and clarification of the concept of public...

  19. MODELLING OF FINANCIAL EFFECTIVENESS AND COMPARATIVE ANALYSIS OF PUBLIC-PRIVATE PARTNERSHIP PROJECTS AND PUBLIC PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Kuznetsov Aleksey Alekseevich

    2017-10-01

    Full Text Available The article substantiates the necessity of extension and development of tools for methodological evaluation of effectiveness of public-private partnership (PPP projects both individually and in comparison of effectiveness of various mechanisms of projects realization on the example of traditional public procurement. The author proposed an original technique of modelling cash flows of private and public partners when realizing the projects based on PPP and on public procurement. The model enables us promptly and with sufficient accuracy to reveal comparative advantages of project forms of PPP and public procurement, and also assess financial effectiveness of the PPP projects for each partner. The modelling is relatively straightforward and reliable. The model also enables us to evaluate public partner's expenses for availability, find the terms and thresholds for interest rates of financing attracted by the partners and for risk probabilities to ensure comparative advantage of PPP project. Proposed criteria of effectiveness are compared with methodological recommendations provided by the Ministry of Economic Development of the Russian Federation. Subject: public and private organizations, financial institutions, development institutions and their theoretical and practical techniques for effectiveness evaluation of public-private partnership (PPP projects. Complexity of effectiveness evaluation and the lack of unified and accepted methodology are among the factors that limit the development of PPP in the Russian Federation nowadays. Research objectives: development of methodological methods for assessing financial efficiency of PPP projects by creating and justifying application of new principles and methods of modelling, and also criteria for effectiveness of PPP projects both individually and in comparison with the public procurement. Materials and methods: open database of ongoing PPP projects in the Russian Federation and abroad was used. The

  20. Developing a stochastic traffic volume prediction model for public-private partnership projects

    Science.gov (United States)

    Phong, Nguyen Thanh; Likhitruangsilp, Veerasak; Onishi, Masamitsu

    2017-11-01

    Transportation projects require an enormous amount of capital investment resulting from their tremendous size, complexity, and risk. Due to the limitation of public finances, the private sector is invited to participate in transportation project development. The private sector can entirely or partially invest in transportation projects in the form of Public-Private Partnership (PPP) scheme, which has been an attractive option for several developing countries, including Vietnam. There are many factors affecting the success of PPP projects. The accurate prediction of traffic volume is considered one of the key success factors of PPP transportation projects. However, only few research works investigated how to predict traffic volume over a long period of time. Moreover, conventional traffic volume forecasting methods are usually based on deterministic models which predict a single value of traffic volume but do not consider risk and uncertainty. This knowledge gap makes it difficult for concessionaires to estimate PPP transportation project revenues accurately. The objective of this paper is to develop a probabilistic traffic volume prediction model. First, traffic volumes were estimated following the Geometric Brownian Motion (GBM) process. Monte Carlo technique is then applied to simulate different scenarios. The results show that this stochastic approach can systematically analyze variations in the traffic volume and yield more reliable estimates for PPP projects.

  1. Defense Infrastructure: DOD Needs Clearer Guidance on Notifying Congress of Privately Financed Construction Projects

    Science.gov (United States)

    2017-01-01

    welfare, and recreation activities such as recreation centers; food , beverage , and entertainment programs; and recreational lodging. Private...fast food restaurants. Because these projects are not authorized and funded through the regular appropriations process for military construction...commissaries.8 These funds can be used for various specified purposes, including the construction of commissaries.9 DOD commissaries are managed by

  2. Institutional conditions for sustainable private sector-led urban development projects : A conceptual model

    NARCIS (Netherlands)

    Heurkens, E.W.T.M.

    2016-01-01

    Across the globe sustainable private sector-led urban development projects (SPUDPs) in the built environment rarely commence as real estate developers face several institutional barriers which limit their capacity to develop economic-viable, social-responsible, environmental-friendly urban places.

  3. Private power in China

    International Nuclear Information System (INIS)

    Daniel, Martin

    1999-10-01

    Contains Executive Summary and Chapters on: Introduction; Political and economic background; Energy supply; The Chinese electricity sector; Private power in China; Issues for private investors; Fuel choice in private projects; Private investors in China; Listed Chinese generators; Private power prospects; Implemented private generation projects; Planned private Generation Projects; Plants owned by listed Chinese generators. (Author)

  4. Design Private Cloud of Oil and Gas SCADA System

    Directory of Open Access Journals (Sweden)

    Liu Miao

    2014-05-01

    Full Text Available SCADA (Supervisory Control and Data Acquisition system is computer control system based on supervisory. SCADA system is very important to oil and gas pipeline engineering. Cloud computing is fundamentally altering the expectations for how and when computing, storage and networking resources should be allocated, managed and consumed. In order to increase resource utilization, reliability and availability of oil and gas pipeline SCADA system, the SCADA system based on cloud computing is proposed in the paper. This paper introduces the system framework of SCADA system based on cloud computing and the realization details about the private cloud platform of SCADA system.

  5. American Indians and Minnesota's Private Colleges. An Evaluation of the Minnesota Private College Research Foundation's Indian Education Project, 1971-72 -- 1974-75.

    Science.gov (United States)

    Panitz, Emanuel

    The Minnesota Private College Research Foundation - Indian Education Project (MPCRF-IEP) provided additional financial support for programs that were unique, developmental, and Indian in their approach to expansion of higher educational opportunities for Native American students. Funding allocated by the Project was made on a dollar for dollar…

  6. Comparing replacement rates under private and federal retirement systems.

    Science.gov (United States)

    Martin, Patricia P

    One measure of the adequacy of retirement income is replacement rate - the percentage of pre-retirement salary that is available to a worker in retirement. This article compares salary replacement rates for private-sector employees of medium and large private establishments with those for federal employees under the Civil Service Retirement System and the Federal Employees Retirement System. Because there is no standard benefit formula to represent the variety of formulas available in the private sector, a composite defined benefit formula was developed using the characteristics of plans summarized in the Bureau of Labor Statistics Medium and Large Employer Plan Survey. The resulting "typical" private-sector defined benefit plan, with an accompanying defined contribution plan, was then compared with the two federal systems. The Civil Service Retirement System (CSRS) is a stand-alone defined benefit plan whose participants are not covered by Social Security. Until passage of the 1983 Amendments to Social Security Act, it was the only retirement plan for most federal civilian employees. Provisions of the 1983 Amendments were designed to restore long-term financial stability to the Social Security trust funds. One provision created the Federal Employees Retirement System (FERS), which covers federal employees hired after 1983. It was one of the provisions designed to restore long-term financial stability to the Social Security trust funds. FERS employees contribute to and are covered by Social Security. FERS, which is a defined benefit plan, also includes a basic benefit and a 401(k)-type plan known as the Thrift Savings Plan (TSP). To compare how retirees would fare under the three different retirement systems, benefits of employees retiring at age 65 with 35 years of service were calculated using hypothetical workers with steady earnings. Workers were classified according to a percentage of the average wage in the economy: low earners (45 percent), average earners

  7. Performance Evaluation of Public-Private Partnership Projects from the Perspective of Efficiency, Economic, Effectiveness, and Equity: A Study of Residential Renovation Projects in China

    Directory of Open Access Journals (Sweden)

    Xuhui Cong

    2018-06-01

    Full Text Available The performance evaluation index system was established on the basis of 4E (Efficiency, Economic, Effectiveness, Equity theory to improve performance evaluation of Public-Private Partnership Projects for Residential Renovation (4P2R. Moreover, the index weighting model was demonstrated based on Ordered Weighted Averaging (OWA. Finally, the cloud model was used for performance evaluation, through the cloud uncertainty reasoning to determine the quantitative performance evaluation index value, the positive reverse cloud to calculate the qualitative performance evaluation index value, and the normal cloud to measure the project performance. The proof-of-concept application shows that the performance evaluation index system and evaluation model can better identify the deficiencies in the project, and provide targeted improvement measures for similar projects in the future.

  8. The Role of Public-Private Partnerships in Local Infrastructure: the Case of Carbon Offset Projects

    International Nuclear Information System (INIS)

    Teichmann, Dorothee

    2011-01-01

    Investment in low carbon infrastructure is considered as an important component of the fight against climate change. The mechanisms of climate regulation (such as carbon offsets) transfer to project developers the risks associated with reducing emissions of greenhouse gas (GHG) emissions, i.e. operational and technological risk, or risks associated with the environmental monitoring and the regulatory mechanism itself. The success of projects - and thus their ability to attract private capital - depends importantly on the risk sharing arrangements between the private and public partners involved in the project. We show that the delegation of tasks between the partners can create risks that affect the environmental effectiveness and economic efficiency of the project. Contracts need to be well designed to mitigate those risks. For a sample of landfill gas flaring projects financed under the Clean Development Mechanism, it is shown that the out-sourcing of the provision of technology creates additional risks. The out-sourcing of the development of the Project Design Documents as required by UNFCCC and the separation of the operation of the landfill and the CDM project appear to be manageable by risk sharing arrangements between partners. In the latter case, each partner should bear the risk associated with his own responsibility. In fact, if carbon revenues are the only income stream for the CDM project developer, the incentive to reduce GHG emissions is maintained. (author)

  9. Examining the Interrelationship among Critical Success Factors of Public Private Partnership Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Shiying Shi

    2016-12-01

    Full Text Available Examining the interrelationships among critical success factors (CSFs for public private partnership (PPP projects is of importance for improving PPP project performance and maintaining the sustainability of PPP project implementation. Previous studies mostly focused on the identification of the CSFs for PPP projects; limited studies investigated the interrelationships among CSFs. Hence, the research objectives are (a to determine the interrelationships among CSFs of PPP projects taking into account the public and (b to identify influence paths contributing to take advantage of CSFs in the process of PPP implementation. A literature review and expert interviews were adopted to construct the CSFs framework; nine hypotheses were constructed and tested by the structural equation modelling (SEM based on the data collected from a questionnaire survey. This research reveals that the relationship between public and private partners is the leader-follower relationship, not the partnership relationship, in PPP projects, indicating that the responsibilities, power or resources existing among partners are very unequal. It also highlights that public involvement has a negative effect on the process of service provisions, and costs and risks exist in the process of public involvement in PPP projects. The determined interrelationships among CSFs will contribute to the sustainability and success of a PPP project.

  10. Arrangement of financing for highway infrastructure projects under the conditions of Public–Private Partnership

    Directory of Open Access Journals (Sweden)

    Vialeta Khmel

    2016-03-01

    Full Text Available This study focused on the mechanism of attracting funds to finance projects in the field of highway infrastructure construction through Public–Private Partnership (PPP. The basis and principles for development of the financial strategy of a project company were defined in this paper. The proposed financial strategy was developed on the basis of diversification of sources of funds and financing instruments with regard to the stages of the project life cycle. The parameters for development of the financial strategy were defined to improve the mechanisms of attraction of the capital for the project and increase the capacity of the project company to pay debts. The proposed financial strategy can be taken as a basis for development of the financial strategy for any project implemented through PPP. The capital market is not stable; therefore, in addition, an algorithm was proposed for more precise selection of sources of financial resources.

  11. Wind farm projects as joint ventures between a Danish utility and private cooperatives

    International Nuclear Information System (INIS)

    Moerup-Petersen, V.; Pedersen, S.

    1992-01-01

    Four cases on successful cooperation between the Danish utility, NESA A/S, and private wind cooperatives are described. In two cases the utility was invited to share the projects prepared by the cooperatives. In the third case the project was developed by the utility. The fourth and most ambitious project, where construction work is just about to start, both parties are involved on a 50/50 basis. The experience gained from the different projects is described. The paper discusses the advantages and disadvantages of joint projects for both parties. Different models on cooperation are outlined. Mainly based on NESA's experience, the joint concept is recommended by the Danish Ministry of Environment. The aim is to get the optimal utilization of the limited siting possibilities in Denmark. The future perspectives of joint projects are anticipated. (au)

  12. Factors determining the success of public private partnership projects in Nigeria

    Directory of Open Access Journals (Sweden)

    Afeez Olalekan Sanni

    2016-06-01

    Full Text Available The implementation of public private partnership (PPP procurement method is expected to help governments in the development of infrastructures and provides an opportunity for the reduction in the governments’ debt profiles. This method has been adopted in Nigeria for more than a decade and with these years of implementation, few infrastructural projects have been developed using this method while some have been unsuccessful. This study aims to examine the PPP projects implementation in Nigeria and identify the most critical factors that could determine the success of such projects. A total of 184 questionnaires were received from public and private sectors’ participants in the implementation of PPP projects. An exploratory factor analysis identified seven critical success factors as projects feedback, leadership focus, risk allocation and economic policy, good governance and political support, short construction period, favourable socio-economic factors, and delivering publicly needed service. This study shows that more developmental projects could be delivered through PPP if the government could focus on these main factors in the implementation process. The result will influence policy development towards PPP and guide the partners in the development of PPP projects.

  13. Snore related signals processing in a private cloud computing system.

    Science.gov (United States)

    Qian, Kun; Guo, Jian; Xu, Huijie; Zhu, Zhaomeng; Zhang, Gongxuan

    2014-09-01

    Snore related signals (SRS) have been demonstrated to carry important information about the obstruction site and degree in the upper airway of Obstructive Sleep Apnea-Hypopnea Syndrome (OSAHS) patients in recent years. To make this acoustic signal analysis method more accurate and robust, big SRS data processing is inevitable. As an emerging concept and technology, cloud computing has motivated numerous researchers and engineers to exploit applications both in academic and industry field, which could have an ability to implement a huge blue print in biomedical engineering. Considering the security and transferring requirement of biomedical data, we designed a system based on private cloud computing to process SRS. Then we set the comparable experiments of processing a 5-hour audio recording of an OSAHS patient by a personal computer, a server and a private cloud computing system to demonstrate the efficiency of the infrastructure we proposed.

  14. Private Sector-led Urban Development Projects. Management, Partnerships and Effects in the Netherlands and the UK

    OpenAIRE

    Erwin Heurkens

    2012-01-01

    Central to this research lays the concept of private sector-led urban development projects (Heurkens, 2010). Such projects involve project developers taking a leading role and local authorities adopting a facilitating role, in managing the development of an urban area, based on a clear public-private role division. Such a development strategy is quite common in Anglo-Saxon urban development practices, but is less known in Continental European practices. Nonetheless, since the beginning of the...

  15. The Implementation of Transportation and Transit Projects on the Basis of Public-Private Partnership in Russia

    Directory of Open Access Journals (Sweden)

    Valery Anatolyevich Tsevtkov

    2016-12-01

    Full Text Available The article considers the main directions of the implementation of the current transportation and transit projects on the basis of the institution of public-private partnership in Russia. This work is a continuation of the study of the theory and practice of the application of public-private partnership in the investment projects aimed at the development and realization of the transportation and transit potential of the country. On the methodological basis of evolutionary and institutional economics, historical approach, system-oriented analysis and the theory of firms, the main current projects for the development of Russian transportation and transit system using public-private partnership are considered. They are the construction of a high-speed line of Moscow — Kazan with subsequent extension to the Chinese border; functioning of the transport and logistics in the Chelyabinsk region; infrastructure of transit cargo by Northern Sea Route; participation of foreign investors in the development of Russian seaports and sea gates. It is shown that the competitive advantage of transit traffic by a particular route requires more traversing speed of cargo with a minimum of stops, handling and overloads in the way. Revenue from transportation and transit potential implementation can be comparable to the size of the resource rent in the case of the development in Russia of the production and transit sector of the economy, and not only of a transit one . In this regard, the emphasis is placed on the determination of the possibility and necessity of organizational changes associated with the development of a large public-private transportation company, able to compete with global sea container services of the route of Asia — Europe. The main directions and activities under the proposed national project «Development of transit economy in Russia: Uniting Eurasia» and its subprogram «Creation of innovative rolling stock for container and multimodal

  16. A systematic look at Tank Waste Remediation System privatization

    International Nuclear Information System (INIS)

    Holbrook, J.H.; Duffy, M.A.; Vieth, D.L.; Sohn, C.L.

    1996-01-01

    The mission of the Tank Waste Remediation System (TWRS) Program is to store, treat, immobilize, and dispose, or prepare for disposal, the Hanford radioactive tank waste in an environmentally sound, safe, and cost effective manner. Highly radioactive Hanford waste includes current and future tank waste plus the cesium and strontium capsules. In the TWRS program, as in other Department of Energy (DOE) clean-up activities, there is an increasing gap between the estimated funding required to enable DOE to meet all of its clean-up commitments and level of funding that is perceived to be available. Privatization is one contracting/management approach being explored by DOE as a means to achieve cost reductions and as a means to achieve a more outcome-oriented program. Privatization introduces the element of competition, a proven means of establishing true cost as well as achieving significant cost reduction

  17. Project W-519 TWRS privatization phase 1 infrastructure year 2000 compliance assessment project plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-519. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance

  18. The privatization mosaic: International power development agendas and opportunities

    International Nuclear Information System (INIS)

    Pfeffer, J.L.

    1992-01-01

    This article examines the international trend toward private ownership of state-owned power production, transmission and distribution systems. The topics of the article include trends towards private investment in electric power systems, alternative opportunities for private sector investment, investor objectives in private power development and utility privatization, and potential investors in overseas projects

  19. Models for assessment of public-private partnership projects in subsurface management

    Directory of Open Access Journals (Sweden)

    И. С. Калгина

    2017-04-01

    Full Text Available Aims and goals of this paper. The article is devoted to analysis of issues related to development of public-private partnership (PPP projects in mineral resources sector of Russia. The special emphasis is given to the most common PPP model in the field of industrial infrastructure construction using the Investment Fund of RF. We offer specific tools to be used with Russian models for assessment of PPP projects and forecasting of its efficiency for its participants. This model allows evaluating the results of the whole deposit development process, constructing graphs of all types of expenditures and revenues (by years, and having rent assessment of deposit NPV (net present value and internal rent rate (IRR.Methods and results. The iteration process at each step enables assessment of budget revenue forecast, living standards indexes, ecological parameters and performance indicators, as well as a certain variant of PPP project implementation for investors (direct government expenses on implementation of infrastructure objects and environmental activities, tax benefits. We have a set of tools for supporting the management decision making process in developing efficient PPP mechanism, balancing long-term government interests, private sector and local people interests arising during socio-economic development of mineral resources area. This method using the suggested tools for analyzing efficiency of a specific partnership mechanism is shown on the examples of projects of developing different deposits in Transbaikal region.

  20. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  1. Culturally appropriate organization of water and sewerage projects built through public private partnerships.

    Directory of Open Access Journals (Sweden)

    Jessica A Kaminsky

    Full Text Available This paper contributes to the pursuit of socially sustainable water and sanitation infrastructure for all people by discovering statistically robust relationships between Hofstede's dimensions of cross-cultural comparison and the choice of contract award types, project type, and primary revenue sources. This analysis, which represents 973 projects distributed across 24 low- and middle-income nations, uses a World Bank dataset describing high capital cost water and sewerage projects funded through private investment. The results show that cultural dimensions explain variation in the choice of contract award types, project type, and primary revenue sources. These results provide empirical evidence that strategies for water and sewerage project organization are not culturally neutral. The data show, for example, that highly individualistic contexts are more likely to select competitive contract award types and to depend on user fees to provide the primary project revenue stream post-construction. By selecting more locally appropriate ways to organize projects, project stakeholders will be better able to pursue the construction of socially sustainable water and sewerage infrastructure.

  2. Culturally appropriate organization of water and sewerage projects built through public private partnerships.

    Science.gov (United States)

    Kaminsky, Jessica A

    2017-01-01

    This paper contributes to the pursuit of socially sustainable water and sanitation infrastructure for all people by discovering statistically robust relationships between Hofstede's dimensions of cross-cultural comparison and the choice of contract award types, project type, and primary revenue sources. This analysis, which represents 973 projects distributed across 24 low- and middle-income nations, uses a World Bank dataset describing high capital cost water and sewerage projects funded through private investment. The results show that cultural dimensions explain variation in the choice of contract award types, project type, and primary revenue sources. These results provide empirical evidence that strategies for water and sewerage project organization are not culturally neutral. The data show, for example, that highly individualistic contexts are more likely to select competitive contract award types and to depend on user fees to provide the primary project revenue stream post-construction. By selecting more locally appropriate ways to organize projects, project stakeholders will be better able to pursue the construction of socially sustainable water and sewerage infrastructure.

  3. Evaluation and financial risk management of urban renewal projects in partnership with public and private

    Directory of Open Access Journals (Sweden)

    Ehsan Hassani

    2011-10-01

    Full Text Available Financing plays an important role for renewal of old city building is find suitable financing plan. A proper financial management in one hand has a direct relationship with project main factors such as: time, cost and quality of the project, and on the other hand, achieving project goals requires a comprehensive insight of project, stockholders as well as other relative situation in regard with the project. Considering the complication of execution such projects and the number of shareholders, one of the best attitudes towards the project management is risk management. This research is a qualitative and practical, which reviews the effects of project management factors on financial return of urban renewal sachem. The required information gained through a survey and via questionnaire and interviews with specialists. This article first describes the public private financial partnership and then, based on the results gained from a case study done on one of the renewal schemes in Mashhad metropolitan areas. Next, it identifies and evaluates of positive and negative risks, which lead to threats and opportunities will be performed and will attempt to respond the existent risks. Finally, we provide a framework for the risk assessment of the housing units.

  4. The Implementation of Transportation and Transit Projects on the Basis of Public-Private Partnership in Russia

    OpenAIRE

    Valery Anatolyevich Tsevtkov; Kobilzhon Khodzhievich Zoidov; Alexey Anatolyevich Medkov

    2016-01-01

    The article considers the main directions of the implementation of the current transportation and transit projects on the basis of the institution of public-private partnership in Russia. This work is a continuation of the study of the theory and practice of the application of public-private partnership in the investment projects aimed at the development and realization of the transportation and transit potential of the country. On the methodological basis of evolutionary and institu...

  5. 23 CFR 752.8 - Privately operated information centers and systems.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Privately operated information centers and systems. 752... may permit privately operated information centers and systems which conform with the standards of this... AND ENVIRONMENT LANDSCAPE AND ROADSIDE DEVELOPMENT § 752.8 Privately operated information centers and...

  6. Success factors for sustainable private business operation of decentralised rural electrification with PV - Results from the project "DELTA PRO RES" in the lower Delta Mekong countries

    OpenAIRE

    Gölz, S.; Vogt, G.; Maigne, Y.; Mozas, K.

    2006-01-01

    The project Delta PRO RES is the response to the wave of electricity sector reform in developing countries in South East Asia which provides opportunities for a new approach: bankable rural electrification. The project prepares the ground for this future track by developing a methodology and markets to increase rural access to energy with decentralized renewable energy systems in the Lower Delta Mekong countries Vietnam, Cambodia and Lao PDR. Private entrepreneurship and venture capital inves...

  7. Exploring Factors Affecting Implementation of Public Private Partnership Housing Projects in Bauchi State, Nigeria

    Directory of Open Access Journals (Sweden)

    Mohammed Sani

    2018-03-01

    Full Text Available Public Private Partnership (PPP Housing scheme in Nigeria is intended to complement government effort toward increasing housing stock and providing affordable housing in the country. However, Bauchi state government adopted the construction of 5,000 phases PPP Housing. But 6 years after the commencement of the scheme, only a few numbers of housing units were completed and commissioned. Therefore, it becomes imperative to carry out research on the impact level of those factors affecting the implementation of the scheme. The aim of the study is to investigate impact level of factors affecting the implementation of PPP housing projects in Bauchi state with a view to find out possible ways that will improve the implementation of the scheme. The descriptive and explorative research design was adopted for this study. 54 structured Questionnaires were administered to construction professional’s staff under private housing developers and relevant government agencies in Bauchi state. 42 valid Questionnaires were retrieved and analysed with SPSS software. The result of the quantitative data analysis shows that creation of favourable investment environment and government support have very high Impact on the implementation of Bauchi PPP housing projects. Therefore, this study recommends that government and other stakeholders should give more attention to the creation of favourable investment environment, support in policy formulation and managerial strategies in the future for improving the implementation of PPP housing projects.

  8. Mirror Confinement Systems: project summaries

    International Nuclear Information System (INIS)

    1980-07-01

    This report contains descriptions of the projects supported by the Mirror Confinement Systems (MCS) Division of the Office of Fusion Energy. The individual project summaries were prepared by the principal investigators, in collaboration with MCS staff office, and include objectives and milestones for each project. In addition to project summaries, statements of Division objectives and budget summaries are also provided

  9. Potential consequences of replacing a retail alcohol monopoly with a private licence system: results from Sweden.

    Science.gov (United States)

    Norström, Thor; Miller, Ted; Holder, Harold; Osterberg, Esa; Ramstedt, Mats; Rossow, Ingeborg; Stockwell, Tim

    2010-12-01

    To examine the potential effects of replacing the Swedish alcohol retail system with a private licensing system on alcohol consumption and alcohol-related harm. Two possible scenarios were analysed: (1) replacing the current alcohol retail monopoly with private licensed stores that specialize in alcohol sales or (2) making all alcohol available in grocery stores. We utilized a multiplicative model that projected effects of changes in a set of key factors including hours of sale, retail prices, promotion and advertising and outlet density. Next, we estimated the effect of the projected consumption increase on a set of harm indicators. Values for the model parameters were obtained from the research literature. Measures of alcohol-related harm included explicitly alcohol-related mortality, accident mortality, suicide, homicide, assaults, drinking driving and sickness absence. According to the projections, scenario 1 yields a consumption increase of 17% (1.4 litres/capita), which in turn would cause an additional 770 deaths, 8500 assaults, 2700 drinking driving offences and 4.5 million sick days per year. The corresponding figures for scenario 2 are a consumption increase of 37.4% (3.1 litres/capita) leading to an additional annual toll of 2000 deaths, 20 000 assaults, 6600 drinking driving offences and 11.1 million days of sick leave. Projections based on the research literature suggest that privatization of the Swedish alcohol retail market would significantly increase alcohol consumption and alcohol-related harm. © 2010 The Authors, Addiction © 2010 Society for the Study of Addiction.

  10. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  11. Determinants of the cost of capital for privately financed hospital projects in the UK.

    Science.gov (United States)

    Colla, Paolo; Hellowell, Mark; Vecchi, Veronica; Gatti, Stefano

    2015-11-01

    Many governments make use of private finance contracts to deliver healthcare infrastructure. Previous work has shown that the rate of return to investors in these markets often exceeds the efficient level. Our focus is on the factors that influence that return. We examine the effect of macroeconomic, project- and firm-level variables using a detailed sample of 84 UK private finance initiative (PFI) contracts signed between 1997 and 2010. Of the above variables, macroeconomic conditions and lead sponsor size are related to the investor return. However, our results show a remarkable degree of stability in the return to investors over the 14-year period. We find evidence of a 'prevailing norm' that is robust to project- and firm-level variation. The sustainability of excess returns over a long period is indicative of a concentrated market structure. We argue that policymakers should consider new mechanisms for increasing competition in the equity market, while ensuring that authorities have the specialist resources required to negotiate efficient contract prices. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  12. Public–private partnerships value in bioenergy projects: Economic feasibility analysis based on two case studies

    International Nuclear Information System (INIS)

    Fantozzi, Francesco; Bartocci, Pietro; D'Alessandro, Bruno; Arampatzis, Stratos; Manos, Basil

    2014-01-01

    Greece and Italy are facing serious energy challenges concerning sustainability and greenhouse gas emissions as well as security of supply and the competitiveness of the internal energy market. These challenges require investments by the public sector, while the countries have seen in the last years their debts rising. A solution to promote bioenergy business, without rising public debt, could be the use of PPP (Public–Private Partnership). This paper presents a methodology to develop agro-energy business using PPP in two rural areas: the municipality of Evropos (in Greece) and the municipality of Montefalco (in Italy). At first biomass availability is studied, then the optimal technology is selected. Once technological issues have been analyzed PPP value for money has to be assessed. Conventional methods to evaluate economic viability of a project are not enough and a Public-Sector Comparator (PSC) has to be calculated. Typical risks of bioenergy projects are identified, estimating their probabilities and consequences. This will lead to associate a monetary value to each risk. Then the identified risks are allocated among private and public partners, establishing synergies. The allocation of risks will have consequences on the preparation of PPP contract and on partner selection procedure. - Highlights: • PPPs can control or reduce risks in bioenergy business. • Development of a methodology for risk allocation in bioenergy projects. • Development of a methodology for risk valuing in bioenergy projects. • A Public-Sector Comparator has been realized for an agro-energy PPP. • Risk allocation has to be clearly indicated in PPP contract

  13. Private Finance Initiative (PFI for Road Projects in UK: Current Practice with a Case Study

    Directory of Open Access Journals (Sweden)

    Rifat Akbiyikli

    2011-05-01

    Full Text Available The long-term sustainable provision of new and high quality maintained road stock is vitally important, especially in times of economic constraint such as Europe is currently experiencing. The Private Finance Initiative (PFI is one method of financing such large-scale, capital intensive projects. An important aspect of this form of financing projects is that the risks are borne not only by the sponsors but are shared by different types of investors such as equity holders, debt providers, and quasi-equity investors. Consequently, a comprehensive and heuristic risk management process is essential for the success of the project. The proposition made within this paper is that the PFI mechanism provides a Value-for-Money and effective mechanism to achieve this. The structure of this PFI finance and investment on a particular road project therefore enables all project stakeholders to take a long-term perspective. This long-term perspective is reflected in the mechanism of a case study of UK – Class A trunk roads which are examined in detail. This paper presents a novel solution to a modern dilemma.

  14. 20 CFR 641.600 - What is the purpose of the private sector training projects authorized under section 502(e) of...

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What is the purpose of the private sector... EMPLOYMENT PROGRAM Private Sector Training Projects Under Section 502(e) of the OAA § 641.600 What is the purpose of the private sector training projects authorized under section 502(e) of the OAA? The purpose of...

  15. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W

    2006-01-01

    In the context of Geographical Information Systems (GIS) the book offers a timely review of map projections (sphere, ellipsoid, rotational surfaces) and geodetic datum transformations. For the needs of photogrammetry, computer vision, and remote sensing space projective mappings are reviewed.

  16. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  17. Reports on 1979 result of Sunshine Project. R and D on solar cooling/heating and hot-water supply system (R and D on system for newly built private housing); 1979 nendo taiyo reidanbo oyobi kyuto system no kenkyu kaihatsu seika hokokusho. Shinchiku kojin jutakuyo system no kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-03-01

    This report is for the results of fiscal 1979 on a solar cooling/heating and hot-water supply system for newly-built private housing. The research reports for fiscal 1974 to 1978 are as reported so far; for example, the research on energy-saving construction including thermal insulation method was used in an experimental housing completed in fiscal 1976. The solar heat collecting device was built in the experimental housing by increasing the scale of and utilizing the heat collecting device of a vacuum glass tube type on which research was done before fiscal 1975. The absorption refrigerating machine incorporated in the housing was of a forced circulation type which was high in temperature stability using the result of the research carried out until then. In fiscal 1979, as in fiscal 1978, one year residential experiment was conducted in which a family of a couple and two children lived in a house under an improved system as a result of a system variation and the like, and made an evaluation on the performance. Simultaneously, a control management system was developed in which a micro-computer was introduced for the purpose of improving the system performance, with the operation carried out under the micro-computer control. In addition, a fundamental experiment was also completed concerning a long-term heat accumulation by underground heat reserve. (NEDO)

  18. Chinese National Optical Education Small Private Online Course system

    Science.gov (United States)

    Zhang, XiaoJie; Lin, YuanFang; Liu, Xu; Liu, XiangDong; Cen, ZhaoFeng; Li, XiaoTong; Zheng, XiaoDong; Wang, XiaoPing

    2017-08-01

    In order to realize the sharing of high quality course resources and promote the deep integration of `Internet+' higher education and talent training, a new on-line to off-line specialized courses teaching mode was explored in Chinese colleges and universities, which emphasized different teaching places, being organized asynchronously and localized. The latest progress of the Chinese National Optical Education Small Private On-line Course (CNOESPOC) system set up by Zhejiang University and other colleges and universities having disciplines in the field of optics and photonics under the guidance of the Chinese National Steering Committee of Optics and Photonics (CNSCOP) was introduced in this paper. The On-line to Off-line (O2O) optical education teaching resource sharing practice offers a new good example for higher education in China under the background of Internet +.

  19. Public Policy Exceptions in European Private Law : A New Research Project

    NARCIS (Netherlands)

    Colombi Ciacchi, Aurelia

    2014-01-01

    Public policy exceptions arguably exist in all fields of private and commerciallaw, not only in private international law but also in substantive law. In substantive private law, the term 'public policy exception' could be used to indicate general illegality rules that make an act of private

  20. The hydroelectric power plant as a project of private investment; La central hidroelectrica como proyecto de inversion privada

    Energy Technology Data Exchange (ETDEWEB)

    Guerra, Eduardo [Industrias Metalurgicas Pescarmona S.A. (IMPSA), Mendoza (Argentina)]. E-mail: guerra@impsa.com.ar

    2001-07-01

    The paper describes the process to be followed for the performance, construction and operation of a hydroelectric investment from the view point of a private investor. The paper demonstrates that it is possible to finance the project through the 'project finance', where the finance has as guarantee the own assets and the fund fluxes of the investment.

  1. Private Schools in France: Evolution of a System.

    Science.gov (United States)

    Teese, Richard

    1986-01-01

    Reviews the major phases of development of the relationship between French private education and the state from the early 1950s when private schools (mostly Catholic) began receiving state subsidies. Concludes that the framework of subsidies has enabled Catholic schools to elaborate new social roles as well as to strengthen their traditional place…

  2. Evaluation of qualitative value for money of public-private partnership projects in Vietnam

    Directory of Open Access Journals (Sweden)

    Dinh Thi Thuy Hang

    2017-12-01

    Full Text Available It is expected that in the period of 2011-2020 projects under the model of public- private partnership (PPP in Vietnam will continue to increase in both number and volume of financing. Despite the substantial volumes of the already performed investments, many practitioners in the field question the viability of Vietnamese PPP projects, in the road sector in particular. Enhancing the viability of these projects is, therefore, vital in the context of the ongoing economic growth. This research is proposing a qualitative value for money assessment, in order to examine the factors influencing PPP projects’ viability in Vietnam. Employing the method of Structural Equation Modeling, the following two aspects will be included in the analysis: 1 financial performance & economic environment; 2 technical capacity & legal environment. The former encompasses “financial interest”, “profitability”, “economic policy” and “demand of service”; while the latter covers “service quality”, “flexibility of contracts”, “legal framework” and “statutory compliance”.

  3. Stakeholders' perception of key performance indicators (KPIs of public-private partnership (PPP projects

    Directory of Open Access Journals (Sweden)

    Olabode Emmanuel Ogunsanmi

    2013-12-01

    Full Text Available The study investigates key performance indicators (KPIs that could improve performance of public-private partnership (PPP projects in Nigeria. The study objectives include a comparison of stakeholders’ perception on KPIs and to investigate if significant difference exists between stakeholders’ perceptions on most KPIs. A structured questionnaire was used to collect information from various respondents who were recently involved in PPP projects. Random sampling technique was used to select forty-five (45 respondents out of which thirty-one (31 responses were used for the data analysis. The results indicate that top KPIs for performance improvement are levels of design complexity and technological advancement, and return on investment. Stakeholders agree on most of the rankings of the KPIs. The general perception of stakeholders was similar on most KPIs except for a few divergent opinions. The study findings have an implication for policy and decision making such that stakeholders could pay special attention to the KPIs identified, that could improve construction project performance. Finally the study recommends further research to explore KPIs for other procurement options.

  4. Reports on 1979 result of Sunshine Project. R and D on solar cooling/heating and hot-water supply system (R and D on system for existing private house); 1979 nendo taiyo reidanbo oyobi kyuto system no kenkyu kaihatsu seika hokokusho. Kison kojin jutakuyo system no kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-05-31

    The following technologies were developed for the purpose of putting into practice an innovative system that performs cooling/heating and hot-water supply for an existing private house economically by solar energy: (1) development of equipment constituting solar cooling/heating and hot-water supply system, and (2) development of a system which uses such equipment and which is inexpensive and safe as well as easy for inspection and maintenance. The results of the research were as follows. A latent heat type heat storage tank was developed in a small low-loss type in which ammonium alum was selected for a high temperature heat storage tank and in which NaCH{sub 3}COO(center dot)3H{sub 2}O were selected for a combination latent heat/cold water heat storage tank. A refrigerator was developed driven by a small Rankine cycle engine of a result coefficient of 0.47. A flat plate type heat collecting device was developed in a type having a BrNi selective absorbing film and materials of copper tube, aluminum plate and double glass. A vacuum heat collecting device was developed in a high efficient type with the outside dimension of {phi} (diameter) 70 x 1,270 mm, selective absorbing film BrNi, and a degree of vacuum of 10{sup -3}Torr. A heat receiving/releasing storm shutter was developed in a type using a latent heat storing material of paraffin wax. A heat absorbing/insulating outside wall panel was developed using FRP and aluminum as the materials. The system analysis also achieved success. (NEDO)

  5. Project W-519 CDR supplement: Raw water and electrical services for privatization contractor, AP tank farm operations

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This supplement to the Project W-519 Conceptual Design will identify a means to provide RW and Electrical services to serve the needs of the TWRS Privatization Contractor (PC) at AP Tank Farm as directed by DOE-RL. The RW will serve the fire suppression and untreated process water requirements for the PC. The purpose of this CDR supplement is to identify Raw Water (RW) and Electrical service line routes to the TWRS Privatization Contractor (PC) feed delivery tanks, AP-106 and/or AP-108, and establish associated cost impacts to the Project W-519 baseline

  6. Institute for Clinical Evaluative Sciences (ICES Exploratory Data & Analytic Services Private Sector Pilot Project

    Directory of Open Access Journals (Sweden)

    Michael Schull

    2017-04-01

    ICES was able to work with private sector organizations without compromising the three principles. Based on the evaluation of the private sector pilot, and the findings from the focus groups, ICES will begin offering limited analytic services to private sector researchers beginning June 2016 under ICES’ existing corporate structure, and bring recommendations regarding ongoing operations to the ICES Board in June 2017.

  7. Trends in Private Sector Development in World Bank Education Projects. Policy Research Working Paper Series.

    Science.gov (United States)

    Sosale, Shobhana

    The private sector is playing an increasingly important role in financing and providing educational services in many countries. (Often the term "private sector" encompasses households' out-of-pocket expenses rather than describing for-profit or not-for-profit sectors.) Private sector development has not arisen primarily through public…

  8. System engineering at the MEGARA project

    Science.gov (United States)

    Pérez-Calpena, A.; García-Vargas, María. Luisa; Gil de Paz, A.; Gallego Maestro, J.; Carrasco Licea, E.; Sánchez Moreno, F.; Iglesias-Páramo, J.

    2014-08-01

    MEGARA (Multi-Espectrógrafo en GTC de Alta Resolución para Astronomía) is a facility instrument of the 10.4m GTC (La Palma, Spain) working at optical wavelengths that provides both Integral-Field Unit (IFU) and Multi- Object Spectrograph (MOS) capabilities at resolutions in the range R=6,000-20,000. The MEGARA focal plane subsystems are located at one of the GTC focal stations, while the MEGARA refractive VPH based spectrograph is located at one of the Nasmyth platforms. The fiber bundles conduct the light from the focal plane subsystems to the pseudo-slits at the entrance of the spectrograph. The project is an initiative led by Universidad Complutense de Madrid (Spain) in collaboration with INAOE (Mexico), IAA-CSIC (Spain) and Universidad Politécnica de Madrid (Spain) and is developed under contract with GRANTECAN. The project is carried out by a multidisciplinary and geographically distributed team, which includes the in-kind contributions of the project partners and personnel from several private companies. The MEGARA system-engineering plan has been tailored to the project and is being applied to ensure the technical control of the project in order to finally meet the science high-level requirements and GTC constrains.

  9. Two management systems in a nursing private practice group.

    Science.gov (United States)

    Zahourek, R P

    1979-09-01

    Entry into private practice can be rewarding for nurses who are willing to risk personal, financial, and professional security. Among the problems faced by the nurse in this new role is the administration of the practice, since few, if any, adequate models exist. This article describes the struggle of nurses in one private nursing practice, Creative Health Services, to meet their needs for individual freedom within an organization that is regulated sufficiently to maintain its viability.

  10. RISK MANAGEMENT IN THE OPERATING ACTIVITIES OF AN ENTERPRISE AND IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS

    Directory of Open Access Journals (Sweden)

    Lech Jędrzejewski

    2017-03-01

    Full Text Available The paper is devoted to issues related to building a risk management system for businesses in the areas of operations and implementation of infrastructure projects. The article defines the concept of risk in business processes and identifies risks occurring in infrastructure projects. In the text, the principles have been presented for protection against the effects of political, contracting, environmental, ecological, product, process, operational and personnel risk.

  11. Dealing with Cultural Differences in Public-Private R&D Projects: The Experience of the Australian Seafood Sector

    NARCIS (Netherlands)

    Dentoni, D.; English, F.

    2012-01-01

    This essay 1) discusses the current agribusiness managers’ human capital problem of dealing with cultural differences in public-private Research & Development (R&D) projects involving firms, government agencies and universities and 2) proposes a “learning by doing” process for managers to

  12. THE FEATURES OF THE PROCEDURE FOR MAKING THE DECISION ON THE IMPLEMENTATION OF PROJECTS THE PUBLIC-PRIVATE PARTNERSHIP

    Directory of Open Access Journals (Sweden)

    M. Vorobiova

    2018-01-01

    Full Text Available The procedure for making a decision on the implementation of public-private partnership, which has developed in Ukraine was examined in the article. Three consecutive stages of preparation for the implementation of projects of partnership between the state and business were сomprehensively considered. The main disadvantages of each stage were determined and suggestions for their improvement were given.

  13. Mobile Information Systems for the Private Everyday Life

    Directory of Open Access Journals (Sweden)

    Oliver Bohl

    2007-01-01

    Full Text Available Despite the high penetration of the private sector in mobile devices, only few applications and services based on mobile technologies are used, and those are rather trivial. This article suggests an approach for the identification of alternatives for the support of processes of everyday life by establishing services based on mobile applications, mobile devices and infrastructures for mobile dispositions. Therefore, a framework for the identification, as well as criteria for the analysis of potential fields of application is discussed. Exemplary benchmarks for selected basic processes in private everyday life visualise the suggested framework, which can be adapted for individual methodical analyses.

  14. Enhancing the Macedonian Health System through Implementation of the Public-Private Partnership Model

    Directory of Open Access Journals (Sweden)

    Dr.Sc. Iskra Belazelkoska Borizovska

    2017-06-01

    Full Text Available The research involves determination of the extent to which the public-private partnership model can contribute to the improvement and enhancement of the healthcare services in Macedonia. To achieve this purpose, the research embraces comprehension of the common advantages and disadvantages of this model, encompassed with a case study of the public-private partnership in the specialized-consultative health protection for the health activity-dialysis, together with other efforts to ensure high quality health protection. It also reflects the attitudes of the public authorities and private sector entities regarding the significance of the public-private partnership model, consideration of the advantages and disadvantages before entering public-private partnerships and the ways public-private partnerships affect the employees and employments. The study outlines planned and realised efforts to implement this model to ensure better and more efficient healthcare system. Generally, the results from the survey and the outlined case study present this model as good solution for many healthcare challenges, since public-private partnerships offer different services to the citizens that neither the public nor the private sector could separately achieve. The public-private partnership model leads to new employment opportunities according to the opinion of the public authorities, while the private sector entities consider that public-private partnerships increase the responsibility of the employees in such partnership in comparison to the public sector. The outlined case study is an example of successful public-private partnership model in the field of healthcare and can serve as motivation for further implementation of this model to ensure better, enhanced and modern health system.

  15. PUBLIC-PRIVATE PARTNERSHIP – THE MOST IMPORTANT MODERN TOOLS OF SUCCESSFUL IMPLEMENTATION OF NATIONAL INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    E. E. Zhukov

    2010-01-01

    Full Text Available Article is devoted to actual problems and prospects of perfection of public private partnership mechanisms at important social and economic investment projects realization. The analysis of foreign practice in the PPP field is carried out. Features of Russian PPP development model are considered. The main difficulties on this way are designated. Such as: absence of the normal competitive environment during the choice of the private partner-investor; absence of the qualified experts in the PPP; imperfect legislative base; corruption of officials, etc. Main offers of perfection of PPP-mechanism in Russia, accounting forthcoming modernization and innovative development of Russian economy are given.

  16. System Expertise Training Courses in Private Sector: Can They Be Given Online?

    Science.gov (United States)

    Balci Demirci, Birim

    2014-01-01

    It is widely known that there are many schools in the private sector offering courses in Computer Technology, Computer Engineering, Information Systems and similar disciplines in addition to Universities presenting such courses. The private sector programs are extremely popular with students already studying at university as well as being of great…

  17. To privatize or not? Addressing public values in a semiprivatized prison system

    NARCIS (Netherlands)

    Reynaers, A.; Paanakker, H.L.

    2016-01-01

    Through public–private partnerships (PPPs), the Dutch government is experimenting with private sector involvement in its prison system. Although considered a promising alternative to traditional public procurement in terms of efficiency and effectiveness, there is a paucity of empirical data on the

  18. What is the private sector? Understanding private provision in the health systems of low-income and middle-income countries.

    Science.gov (United States)

    Mackintosh, Maureen; Channon, Amos; Karan, Anup; Selvaraj, Sakthivel; Cavagnero, Eleonora; Zhao, Hongwen

    2016-08-06

    Private health care in low-income and middle-income countries is very extensive and very heterogeneous, ranging from itinerant medicine sellers, through millions of independent practitioners-both unlicensed and licensed-to corporate hospital chains and large private insurers. Policies for universal health coverage (UHC) must address this complex private sector. However, no agreed measures exist to assess the scale and scope of the private health sector in these countries, and policy makers tasked with managing and regulating mixed health systems struggle to identify the key features of their private sectors. In this report, we propose a set of metrics, drawn from existing data that can form a starting point for policy makers to identify the structure and dynamics of private provision in their particular mixed health systems; that is, to identify the consequences of specific structures, the drivers of change, and levers available to improve efficiency and outcomes. The central message is that private sectors cannot be understood except within their context of mixed health systems since private and public sectors interact. We develop an illustrative and partial country typology, using the metrics and other country information, to illustrate how the scale and operation of the public sector can shape the private sector's structure and behaviour, and vice versa. Copyright © 2016 Elsevier Ltd. All rights reserved.

  19. A Decision-Making Model to Attract Private Sector Investors into BOT and BOO Water and Sanitation Projects

    Directory of Open Access Journals (Sweden)

    Elnaz Abbaszadeh

    2017-03-01

    Full Text Available Economic development in any country depends on a multitude of factors, among which infrastructure construction projects constitute a major part. Included in this category are large-scale water supply and sanitation schemes that are commonly state-owned and require large allocations from the public funds. Article 214 of the 5th National Development Plan of the Islamic Republic of Iran mandates the Government to employ such public-private partnership tools as BOT (Build-Operate-Transfer and BOO (Build-Own-Operate as the means towards attracting private sector participation to ensure enhanced the efficiency and effectiveness of infrastructure projects. It is the objective of the present study to survey and identify the challenges facing such schemes based on the assessment of the contractual criteria and conditions commonly practiced in water and sanitation projects. The results are expected to lead to the development of a decision-making model that will encourage the private sector’s decision-makers to invest in these projects. Information was collected in two stages. The first stage involved a review of model contracts and interviews with water and sanitation experts. The data thus obtained was subjected to analysis using the SPSS software, which yielded 14 indices as the major components of the public-private partnership contracts used in the industry. In a second stage, the indices were tabulated and prepared in the form of a questionnaire which was presented to experts who were asked to assign weight scores of 1 to 10 to each of the indices. Ranking and scoring was accomplished using the TOPSIS method. Finally, the Pareto diagram was used to select the 10 more important indices which were further divided into two major and minor categories of indices. A model was then developed for scoring by the private sector investment advisors to help them in their decision-making process regarding BOD and BOO water and sanitation projects. The model

  20. Re-reform of Latin American Private Pensions Systems: Argentinian and Chilean Models and Lessons

    OpenAIRE

    Carmelo Mesa-Lago

    2009-01-01

    Between 1981 and 2008, 11 countries in Latin America structurally reformed their defined-benefit, Pay-As-You-Go, public pension systems, partially or totally replacing them with defined contribution, fully funded, privately managed schemes based on individual accounts. Initial failures in design and subsequent performance of the private systems led to partial corrections, but in 2008 two countries implemented far reaching “re-reforms”: Chile maintained and improved its system, whereas Argenti...

  1. Achievement report for fiscal 1981 on New Energy and Industrial Technology Development Organization-entrusted projects on the development of photovoltaic power system practical application technologies. Research and development of a photovoltaic power demonstration system (Research and development of private house systems); 1981 nendo taiyoko hatsuden system jitsuyoka gijutsu kaihatsu seika hokokusho. Taiyoko hatsuden demonstration system no kenkyu kaihatsu (kojin jutakuyo system no kenkyu kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    Private house systems are investigated for system constitution, detailed design is drawn, and a model house is built. For system control and protection, the power conversion unit is provided with a control which functions to constantly maximize the output. The power conversion unit without an internal oscillator is equipped with another control which functions to output single-phase AC power coincident with the commercial system in voltage and frequency when it is interconnected with the system. The power conversion unit is so designed that it is automatically stopped for the prevention of reverse voltage imposition on the commercial system in case of interruption in the commercial system. In the study of roof panel type solar cells, real-size panels are designed and fabricated, capable of a total of 3kWp. In the study of element devices, a real-size conversion unit is experimentally built and tested in combination with a rectifier and solar cells, and it is found that the unit functions as expected. A model house is designed incorporating the results of the above-said research, and is built in the precinct of a laboratory of the Fuji Electric Co., Ltd. (NEDO)

  2. Private equity and venture capital in South Africa: A comparison of project financing decisions

    Directory of Open Access Journals (Sweden)

    David Portmann

    2013-09-01

    Full Text Available This paper investigates the manner in which private equity and venture capital firms in South Africa assess investment opportunities. The analysis was facilitated using a survey containing both Likert-scale and open-ended questions. The key findings show that both private equity and venture capital firms rate the entrepreneur or management team higher than any other criterion or consideration. Private equity firms, however, emphasise financial criteria more than venture capitalists do. There is also an observable shift in the investment activities away from start-up funding, towards later-stage deals. Risk appetite has also declined post the financial crisis.

  3. Private sector participation and health system performance in sub-saharan Africa.

    Science.gov (United States)

    Yoong, Joanne; Burger, Nicholas; Spreng, Connor; Sood, Neeraj

    2010-10-07

    The role of the private health sector in developing countries remains a much-debated and contentious issue. Critics argue that the high prices charged in the private sector limits the use of health care among the poorest, consequently reducing access and equity in the use of health care. Supporters argue that increased private sector participation might improve access and equity by bringing in much needed resources for health care and by allowing governments to increase focus on underserved populations. However, little empirical exists for or against either side of this debate. We examine the association between private sector participation and self-reported measures of utilization and equity in deliveries and treatment of childhood respiratory disease using regression analysis, across a sample of nationally-representative Demographic and Health Surveys from 34 SSA economies. We also examine the correlation between private sector participation and key background factors (socioeconomic development, business environment and governance) and use multivariate regression to control for potential confounders. Private sector participation is positively associated with greater overall access and reduced disparities between rich and poor as well as urban and rural populations. The positive association between private sector participation and improved health system performance is robust to controlling for confounders including per capita income and maternal education. Private sector participation is positively correlated with measures of socio-economic development and favorable business environment. Greater participation is associated with favorable intermediate outcomes in terms of access and equity. While these results do not establish a causal link between private sector participation and health system performance, they suggest that there is no deleterious link between private sector participation and health system performance in SSA.

  4. Design requirements document for the phase 1 privatization electrical power system

    Energy Technology Data Exchange (ETDEWEB)

    Singh, G.

    1997-10-31

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract.

  5. Design requirements document for the phase 1 privatization electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract

  6. Engineered Geothermal System Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Petty, Susan

    2014-06-19

    In June 2009, AltaRock Energy began field work on a project supported by the U.S. Department of Energy entitled “Use of Multiple Stimulations to Improve Economics of Engineered Geothermal Systems in Shallow High Temperature Intrusives.” The goal of the project was to develop an Engineered Geothermal System (EGS) in the portion of The Geysers geothermal field operated by the Northern California Power Agency (NCPA). The project encountered several problems while deepening Well E-7 which culminated in the suspension of field activities in September 2009. Some of the problems encountered are particular to The Geysers area, while others might be encountered in any geothermal field, and they might be avoided in future operations.

  7. Getting Digital Assets from Public-Private Partnership Research Projects through "The Valley of Death," and Making Them Sustainable.

    Science.gov (United States)

    Aartsen, Wendy; Peeters, Paul; Wagers, Scott; Williams-Jones, Bryn

    2018-01-01

    Projects in public-private partnerships, such as the Innovative Medicines Initiative (IMI), produce data services and platforms (digital assets) to help support the use of medical research data and IT tools. Maintaining these assets beyond the funding period of a project can be a challenge. The reason for that is the need to develop a business model that integrates the perspectives of all different stakeholders involved in the project, and these digital assets might not necessarily be addressing a problem for which there is an addressable market of paying customers. In this manuscript, we review four IMI projects and the digital assets they produced as a means of illustrating the challenges in making digital assets sustainable and the lessons learned. To progress digital assets beyond proof-of-concept into widely adopted tools, there is a need for continuation of multi-stakeholder support tailored to these assets. This would be best done by implementing a structure similar to the accelerators that are in place to help transform startup businesses into growing and thriving businesses. The aim of this article is to highlight the risk of digital asset loss and to provoke discussion on the concept of developing an "accelerator" for digital assets from public-private partnership research projects to increase the chance that digital assets will be sustained and continue to add value long after a project has ended.

  8. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  9. Reservation Application System Of Private Lesson At Easyspeak Denpasar Based On Web And Android

    Directory of Open Access Journals (Sweden)

    Ferry yudhitama putra

    2016-06-01

    Full Text Available Abstract— English Private lessons institutes are now widely facilitates a person to develop English skills in speaking and writing. Currently the service users private lessons English book private lessons manually, that is by coming directly to the place as well as through the telephone service, but with the operator even then still have difficulties in user validation that requires a long time. To facilitate the user in terms of the reservation, then the system will be built based on web and Android. Development of private lessons reservation application built with PHP and Java programming language using CodeIgniter framework on the web side , while on the Android using Eclipse tools , and MySQL as database storage media . Applications reservation private lessons has several functions to make a reservation time and tutor can be done by the student of Easyspeak and on the side of the tutor application can provide information about the student will be taught , as well as on the side of the operator to provide ease in setting booking private lessons because it computerized not manually as before. Applications reservation private lessons are also equipped with a reminder or reminders are made on the side of Android apps , using alarmmanager system.

  10. Expert system application education project

    Science.gov (United States)

    Gonzelez, Avelino J.; Ragusa, James M.

    1988-01-01

    Artificial intelligence (AI) technology, and in particular expert systems, has shown potential applicability in many areas of operation at the Kennedy Space Center (KSC). In an era of limited resources, the early identification of good expert system applications, and their segregation from inappropriate ones can result in a more efficient use of available NASA resources. On the other hand, the education of students in a highly technical area such as AI requires an extensive hands-on effort. The nature of expert systems is such that proper sample applications for the educational process are difficult to find. A pilot project between NASA-KSC and the University of Central Florida which was designed to simultaneously address the needs of both institutions at a minimum cost. This project, referred to as Expert Systems Prototype Training Project (ESPTP), provided NASA with relatively inexpensive development of initial prototype versions of certain applications. University students likewise benefit by having expertise on a non-trivial problem accessible to them at no cost. Such expertise is indispensible in a hands-on training approach to developing expert systems.

  11. Private prisons

    Directory of Open Access Journals (Sweden)

    Dimovski Darko

    2014-01-01

    Full Text Available The author, based on the circumstances that contributed to the creation of private prisons, has explained the historical development of private prisons in the United States and Great Britain. After that, the author has analyzed the strengths and weaknesses of the prison run by private companies. Namely, the author has, stating the benefits of private prisons (reduced overcrowding penitencijarnih institution, cheaper accommodation cost per prisoner, provide better services, the possibility of applying a new philosophy in the manner of execution of sentence, with modern Penitentiary program, with the aim of re-socialization and the reduction of recidivism and weaknesses of the private prisons (the question of legitimac, a chronic lack of space in the Penitentiary system is not solved, business-oriented policies of private prisons, less salaries, poor performance of the security service, worst food, weak enforcement of parole, lack of appropriate penitentiary program, wanted to draw attention to the professional public about controversy of the introduction private companies in the management structure of penitentiary institutions . As the Republic of Serbia is, constantly in the last twenty years, faced with the increasing number of inmates, as well as the chronic shortage of money, which affects on the situation in industrial areas of prisons, there are options to give licenses to private companies to manage prisons. Therefore, the author has paid special attention to potential problems of introducing private prisons in the penitentiary system in Serbia.

  12. Leveraging energy efficiency to finance public-private social housing projects

    International Nuclear Information System (INIS)

    Copiello, Sergio

    2016-01-01

    The Italian housing model relies on a high rate of privately owned houses. In comparison, few dwellings are built and managed by the public sector. The social housing stock has been built mainly during some post-second world war decades; instead, since the early nineties, it underwent a privatization process. Such a model is inefficient and iniquitous in the long run. Therefore, after being disregarded for several years, social housing has gone back to be among the main agenda items. Nonetheless, due to the lack of public grants, new funding sources are required. The government now fosters an increasing involvement of private finance through Public-Private Partnership schemes. A first outcome can be found in some pioneering experiences. Their comparative analysis allows bringing out worthwhile findings, which are useful to steer housing policies. Moderate to low yields entail the need to involve new kinds of private entities, particularly those adopting a venture philanthropy approach. Meanwhile, building energy performance measures are a crucial driver of feasibility. They allow the tenants to be willing to pay agreed rents somehow higher than both social rents of protected tenancies and fair rents of regulated tenancies. - Highlights: •In Italy, the provision of affordable dwellings was disregarded for years. •Recently, instead, social housing has come back to be among the main agenda items. •Latest regulations try to tie together social housing and Public-Private Partnership. •Social tenants may be asked to pay more than in protected and regulated tenancies. •Energy-efficient measures allow keeping the tenants neutral about the rent increase.

  13. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  14. Design, Development and Implementation of Decision Support Systems for Private Equity Investment

    OpenAIRE

    Vroomen, Paul

    2017-01-01

    The objective of this research is to design, develop and implement an intelligent decision support system (IDSS) for making rational private equity investment decisions. (Private equity investments are capital investments in enterprises that are not traded on public equity markets; they include Equity Buy-Out, Venture Capital, and the new Equity Crowd Funding (ECF) asset classes). The design and development of the IDSS requires the integration of investment science (valuation theory, portfoli...

  15. Multi-Criterion Two-Sided Matching of Public–Private Partnership Infrastructure Projects: Criteria and Methods

    Directory of Open Access Journals (Sweden)

    Ru Liang

    2018-04-01

    Full Text Available Two kinds of evaluative criteria are associated with Public–Private Partnership (PPP infrastructure projects, i.e., private evaluative criteria and public evaluative criteria. These evaluative criteria are inversely related, that is, the higher the public benefits; the lower the private surplus. To balance evaluative criteria in the Two-Sided Matching (TSM decision, this paper develops a quantitative matching decision model to select an optimal matching scheme for PPP infrastructure projects based on the Hesitant Fuzzy Set (HFS under unknown evaluative criterion weights. In the model, HFS is introduced to describe values of the evaluative criteria and multi-criterion information is fully considered given by groups. The optimal model is built and solved by maximizing the whole deviation of each criterion so that the evaluative criterion weights are determined objectively. Then, the match-degree of the two sides is calculated and a multi-objective optimization model is introduced to select an optimal matching scheme via a min-max approach. The results provide new insights and implications of the influence on evaluative criteria in the TSM decision.

  16. A new method for generating an invariant iris private key based on the fuzzy vault system.

    Science.gov (United States)

    Lee, Youn Joo; Park, Kang Ryoung; Lee, Sung Joo; Bae, Kwanghyuk; Kim, Jaihie

    2008-10-01

    Cryptographic systems have been widely used in many information security applications. One main challenge that these systems have faced has been how to protect private keys from attackers. Recently, biometric cryptosystems have been introduced as a reliable way of concealing private keys by using biometric data. A fuzzy vault refers to a biometric cryptosystem that can be used to effectively protect private keys and to release them only when legitimate users enter their biometric data. In biometric systems, a critical problem is storing biometric templates in a database. However, fuzzy vault systems do not need to directly store these templates since they are combined with private keys by using cryptography. Previous fuzzy vault systems were designed by using fingerprint, face, and so on. However, there has been no attempt to implement a fuzzy vault system that used an iris. In biometric applications, it is widely known that an iris can discriminate between persons better than other biometric modalities. In this paper, we propose a reliable fuzzy vault system based on local iris features. We extracted multiple iris features from multiple local regions in a given iris image, and the exact values of the unordered set were then produced using the clustering method. To align the iris templates with the new input iris data, a shift-matching technique was applied. Experimental results showed that 128-bit private keys were securely and robustly generated by using any given iris data without requiring prealignment.

  17. Quality of the ophthalmological service to outpatients of the public and private healthcare systems.

    Science.gov (United States)

    Hercos, Benigno Vicente Santos; Berezovsky, Adriana

    2017-01-01

    To compare perceptions of the quality of ophthalmological services offered to outpatients from the public healthcare system to those from the private healthcare system, and to determine which measures are seen as necessary and a priority for improving the quality of care. This was a prospective observational study on 200 patients, 101 and 99 of whom were from the public and private healthcare systems, respectively. All patients underwent an ophthalmological examination at an ophthalmology hospital in Belo Horizonte, Minas Gerais, Brazil. Personal interviews were conducted using two structured questionnaires adapted from the modified SERVQUAL scale. Overall, patients from the private healthcare system were significantly more dissatisfied than those from the public healthcare system. In both systems, reliability was considered to be the most important determinant of quality, and it presented the highest level of dissatisfaction. Satisfaction with the public healthcare system was significantly greater than that with the private healthcare system in terms of the tangibles, reliability, responsiveness, and assurance determinants of the SERVQUAL scale. Institutions must plan, execute, evaluate, and monitor measures that seek to improve the overall patient satisfaction with the quality of services provided, particularly in the private healthcare system, and special attention must be paid to reliability in both healthcare systems. The identification and monitoring of the quality of healthcare services through the periodic use of the SERVQUAL scale may provide healthcare managers with information so that they can identify, plan, and monitor necessary and priority measures. This could be a key strategy for improving the quality of outpatient health services in the public and private systems.

  18. A Guide to Community Shared Solar: Utility, Private, and Non-Profit Project Development (Book)

    Energy Technology Data Exchange (ETDEWEB)

    Coughlin, J.; Grove, J.; Irvine, L.; Jacobs, J. F.; Johnson Phillips, S.; Sawyer, A.; Wiedman, J.

    2012-05-01

    This guide is organized around three sponsorship models: utility-sponsored projects, projects sponsored by special purpose entities - businesses formed for the purpose of producing community solar power, and non-profit sponsored projects. The guide addresses issues common to all project models, as well as issues unique to each model.

  19. Design Private Cloud of Oil and Gas SCADA System

    OpenAIRE

    Liu Miao; Mancang Yuan; Guodong Li

    2014-01-01

    SCADA (Supervisory Control and Data Acquisition) system is computer control system based on supervisory. SCADA system is very important to oil and gas pipeline engineering. Cloud computing is fundamentally altering the expectations for how and when computing, storage and networking resources should be allocated, managed and consumed. In order to increase resource utilization, reliability and availability of oil and gas pipeline SCADA system, the SCADA system based on cloud computing is propos...

  20. Real Property Project Tracking System (RPPTS)

    Data.gov (United States)

    Department of Veterans Affairs — The Real Property Project Tracking System (RPPTS), formerly known as the Lease/Project Tracking (LEASE) database, contains information about lease and land projects...

  1. Special report: Turkish privatisation; Government encourages private generation projects and the sale of TEK distribution functions

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1991-01-25

    A brief report is given for the Turkish energy plans for the period 1990-94 concentrating particularly on electricity supply. One of the options to be considered is the privatization of electricity generation and the selling off of distribution companies. The concept of ''build, operate and transfer'' methods of franchising, financing, constructing and operating new generation plant is discussed. (UK).

  2. Project management plan double-shell tank system specification development

    International Nuclear Information System (INIS)

    Conrads, T.J.

    1998-01-01

    The Project Hanford Management Contract (PHMC) members have been tasked by the US Department of Energy (DOE) to support removal of wastes from the Hanford Site 200 Area tanks in two phases. The schedule for these phases allows focusing on requirements for the first phase of providing feed to the privatized vitrification plants. The Tank Waste Retrieval Division near-term goal is to focus on the activities to support Phase 1. These include developing an integrated (technical, schedule, and cost) baseline and, with regard to private contractors, establishing interface agreements, constructing infrastructure systems, retrieving and delivering waste feed, and accepting immobilized waste products for interim onsite storage. This document describes the process for developing an approach to designing a system for retrieving waste from double-shell tanks. It includes a schedule and cost account for the work breakdown structure task

  3. Exploration Medical System Demonstration Project

    Science.gov (United States)

    Chin, D. A.; McGrath, T. L.; Reyna, B.; Watkins, S. D.

    2011-01-01

    A near-Earth Asteroid (NEA) mission will present significant new challenges including hazards to crew health created by exploring a beyond low earth orbit destination, traversing the terrain of asteroid surfaces, and the effects of variable gravity environments. Limited communications with ground-based personnel for diagnosis and consultation of medical events require increased crew autonomy when diagnosing conditions, creating treatment plans, and executing procedures. Scope: The Exploration Medical System Demonstration (EMSD) project will be a test bed on the International Space Station (ISS) to show an end-to-end medical system assisting the Crew Medical Officers (CMO) in optimizing medical care delivery and medical data management during a mission. NEA medical care challenges include resource and resupply constraints limiting the extent to which medical conditions can be treated, inability to evacuate to Earth during many mission phases, and rendering of medical care by a non-clinician. The system demonstrates the integration of medical technologies and medical informatics tools for managing evidence and decision making. Project Objectives: The objectives of the EMSD project are to: a) Reduce and possibly eliminate the time required for a crewmember and ground personnel to manage medical data from one application to another. b) Demonstrate crewmember's ability to access medical data/information via a software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities. d) Develop a common data management architecture that allows for scalability, extensibility, and interoperability of data sources and data users. e) Lower total cost of ownership for development and sustainment of peripheral hardware and software that use EMSD for data management f) Provide

  4. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  5. The international right to health: state obligations and private actors in the health care system.

    Science.gov (United States)

    O'Brien, Paula

    2013-09-01

    Most health systems have historically used a mix of public and private actors for financing and delivering care. But the last 30 years have seen many rich and middle-income countries moving to privatise parts of their health care systems. This phenomenon has generated concerns, especially about equitable access to health care. This article examines what the international right to the highest attainable standard of health in Art 12 of the International Covenant on Economic, Social and Cultural Rights says about the obligations of states which use private actors in health care. The article involves a close study of the primary documents of the key institutions responsible for interpreting and promoting Art 12. From this study, the article concludes that in mixed public-private health care systems, states not only retain primary responsibility for fulfilling the right to health but are subject to a range of additional specific responsibilities.

  6. Meeting the Challenge: Quality Systems in Private Higher Education in Kuwait

    Science.gov (United States)

    Al-Atiqi, Imad M.; Alharbi, Lafi M.

    2009-01-01

    In Kuwait, as in other rapidly-developing higher education systems, one major area of concern is ensuring the quality of education offered by private providers. This paper briefly reviews the history of the development of higher education in Kuwait since its inception in 1936. It considers various quality systems currently in place in other…

  7. Utilization of dental health services by Danish adolescents attending private or public dental health care systems

    DEFF Research Database (Denmark)

    Christensen, Lisa Bøge; Petersen, Poul Erik; Bastholm, Annelise

    2002-01-01

    The objectives of the study were: 1) to describe the choice of dental care system among 16-year-olds, 2) to describe the utilization of dental services among 16-17-year-olds enrolled in either public or private dental care systems, and to compare the dental services provided by the alternative...

  8. Role of emerging private hospitals in a post-Soviet mixed health system: a mixed methods comparative study of private and public hospital inpatient care in Mongolia.

    Science.gov (United States)

    Tsevelvaanchig, Uranchimeg; Gouda, Hebe; Baker, Peter; Hill, Peter S

    2017-05-01

    The collapse of the Soviet Union in 1990 severely impacted the health sector in Mongolia. Limited public funding for the post-Soviet model public system and a rapid growth of poorly regulated private providers have been pressing issues for a government seeking to re-establish universal health coverage. However, the evidence available on the role of private providers that would inform sector management is very limited. This study analyses the current contribution of private hospitals in Mongolia for the improvement of accessibility of health care and efficiency. We used mixed research methods. A descriptive analysis of nationally representative hospital admission records from 2013 was followed by semi-structured interviews that were carried out with purposively selected key informants (N = 45), representing the main actors in Mongolia's mixed health system. Private-for-profit hospitals are concentrated in urban areas, where their financial model is most viable. The result is the duplication of private and public inpatient services, both in terms of their geographical location and the range of services delivered. The combination of persistent inpatient-oriented care and perverse financial incentives that privilege admission over outpatient management, have created unnecessary health costs. The engagement of the private sector to improve population health outcomes is constrained by a series of issues of governance, regulation and financing and the failure of the state to manage the private sector as an integral part of its health system planning. For a mixed system like in Mongolia, a comprehensive policy and plan which defines the complementary role of private providers to optimize private public service mix is critical in the early stages of the private sector development. It further supports the importance of a system perspective that combines regulation and incentives in consistent policy, rather than an isolated approach to provide regulation. © The Author

  9. Future projections of insured losses in the German private building sector following the A1B climatic change scenario

    Science.gov (United States)

    Held, H.; Gerstengarbe, F.-W.; Hattermann, F.; Pinto, J. G.; Ulbrich, U.; Böhm, U.; Born, K.; Büchner, M.; Donat, M. G.; Kücken, M.; Leckebusch, G. C.; Nissen, K.; Nocke, T.; Österle, H.; Pardowitz, T.; Werner, P. C.; Burghoff, O.; Broecker, U.; Kubik, A.

    2012-04-01

    We present an overview of a complementary-approaches impact project dealing with the consequences of climate change for the natural hazard branch of the insurance industry in Germany. The project was conducted by four academic institutions together with the German Insurance Association (GDV) and finalized in autumn 2011. A causal chain is modeled that goes from global warming projections over regional meteorological impacts to regional economic losses for private buildings, hereby fully covering the area of Germany. This presentation will focus on wind storm related losses, although the method developed had also been applied in part to hail and flood impact losses. For the first time, the GDV supplied their collected set of insurance cases, dating back for decades, for such an impact study. These data were used to calibrate and validate event-based damage functions which in turn were driven by three different types of regional climate models to generate storm loss projections. The regional models were driven by a triplet of ECHAM5 experiments following the A1B scenario which were found representative in the recent ENSEMBLES intercomparison study. In our multi-modeling approach we used two types of regional climate models that conceptually differ at maximum: a dynamical model (CCLM) and a statistical model based on the idea of biased bootstrapping (STARS). As a third option we pursued a hybrid approach (statistical-dynamical downscaling). For the assessment of climate change impacts, the buildings' infrastructure and their economic value is kept at current values. For all three approaches, a significant increase of average storm losses and extreme event return levels in the German private building sector is found for future decades assuming an A1B-scenario. However, the three projections differ somewhat in terms of magnitude and regional differentiation. We have developed a formalism that allows us to express the combined effect of multi-source uncertainty on return

  10. Private and Public Pension Systems Worldwide: Case of Russia

    Directory of Open Access Journals (Sweden)

    Aleksei V. Pudovkin

    2016-01-01

    Full Text Available The article deals with the Russian pension system and make recommendations for its further development on the basis of international experience. The Russian pension system is in a state of transition. The reform of 2013-2015 is not completed, since in its current state pension system is still characterized by very low replacement rate value at a very high level of government spending. Moratorium on pension accumulation introduced in the course of recent reforms calls into question the future of the mandatory funded pension system. Review of international pension systems formation suggests that the most successful of them are not limited solely to public system, and use a combination of distribution and accumulation units. When choosing between mandatory or voluntary options they are guided by the characteristics of the national economy. Studying the successes and mistakes of world practice of voluntary and mandatory funded pension systems is of great scientific and practical interest, since it can contribute to a more accurate choice of the future path of development of the national pension system.

  11. Integrating the NEPA 216 process with large-scale privatization projects under the US Department of Energy

    International Nuclear Information System (INIS)

    Eccleston, C.H.

    1994-05-01

    The US Department of Energy (DOE) is considering the possibility of replacing the existing Hanford Site 200 Are steam system through a privatization effort. Such an action would be subject to requirements of the National Environmental Policy Act (NEPA) of 1969. Section 216 of the Doe NEPA Implementation Procedures (216 Process) provides a specific mechanism for integrating the DOE procurement process with NEPA compliance requirements

  12. Private personalized social recommendations in an IPTV system

    Science.gov (United States)

    Elmisery, Ahmed M.

    2014-04-01

    In our connected world, recommender systems have become widely known for their ability to provide expert and personalize referrals to end-users in different domains. The rapid growth of social networks and new kinds of systems so called "social recommender systems" are rising, where recommender systems can be utilized to find a suitable content according to end-users' personal preferences. However, preserving end-users' privacy in social recommender systems is a very challenging problem that might prevent end-users from releasing their own data, which detains the accuracy of extracted referrals. In order to gain accurate referrals, social recommender systems should have the ability to preserve the privacy of end-users registered in this system. In this paper, we present a middleware that runs on end-users' Set-top boxes to conceal their profile data when released for generating referrals, such that computation of recommendation proceeds over the concealed data. The proposed middleware is equipped with two concealment protocols to give users a complete control on the privacy level of their profiles. We present an IPTV network scenario and perform a number of different experiments to test the efficiency and accuracy of our protocols. As supported by the experiments, our protocols maintain the recommendations accuracy with acceptable privacy level.

  13. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  14. Marketing Promotion and Distribution of Project within Private and Public Sphere

    OpenAIRE

    Rastislav Kerul

    2008-01-01

    The topic of marketing implementation within project management is out of interest of many authors. There are a few literature sources related to the theme. Our science interest is to analyze and outline the main possibilities of marketing conception implementation within project realization in order to make their distribution and promotion effective to reach the target groups and publics. We try to describe main basis of marketing perspective in managing projects in relation to target groups...

  15. Private sector malaria RDT initiative in Nigeria: lessons from an end-of-project stakeholder engagement meeting.

    Science.gov (United States)

    Odugbemi, Babatunde; Ezeudu, Chijioke; Ekanem, Anyiekere; Kolawole, Maxwell; Akanmu, Idowu; Olawole, Aderemi; Nglass, Nkabono; Nze, Chinwe; Idenu, Edward; Audu, Bala Mohammed; Ntadom, Godwin; Alemu, Wondimagegnehu; Mpazanje, Rex; Cunningham, Jane; Akubue, Augustine; Arowolo, Tolu; Babatunde, Seye

    2018-02-06

    The malaria rapid diagnosis testing (RDT) landscape is rapidly evolving in health care delivery in Nigeria with many stakeholders playing or having potential for critical roles. A recent UNITAID grant supported a pilot project on the deployment of quality-assured RDTs among formal and informal private service outlets in three states in Nigeria. This paper describes findings from a series of stakeholder engagement meetings held at the conclusion of the project. The agreed meeting structure was a combination of plenary presentations, structured facilitated discussions, and nominal group techniques to achieve consensus. Rapporteurs recorded the meeting proceeding and summaries of the major areas of discussion and consensus points through a retrospective thematic analysis of the submitted meeting reports. Key findings indicate that private providers were confident in the use of RDTs for malaria diagnosis and believed it has improved the quality of their services. However, concerns were raised about continued access to quality-assured RDT kits. Going forward, stakeholders recommended increasing client-driven demand, and continuous training and supervision of providers through integration with existing monitoring and supervision mechanisms.

  16. Italian tariff system - relationships with public and private institutions

    International Nuclear Information System (INIS)

    Bertone, P.F.

    1996-01-01

    In all countries where the gas industry has reached a significant level of development, the public authorities subject companies to restrictions and control of various types. The intervention of the State influences significantly the gas sector. In this respect the relations with concession system should be taken into account as well as the relations between transmission company and distribution companies. A distinction is to be made in sales at two market segments, commercial and residential and industrial. Basic criteria for a tariff system are based on balancing revenue and costs, and constant control of costs. Standard cost components are: raw materials, staff, real estate management, operation costs and general expenses

  17. Capital budgeting under relational contracting: optimal ranking and duration criteria for schemes of concession, project-financing and public-private partnership

    OpenAIRE

    Biondi, Yuri

    2009-01-01

    International audience; Project-financing and public-private partnership schemes are joint projects of investment that are generally submitted to investment valuation criteria based on compound discounting. However, the theoretical basis of these criteria is at issue nowadays. According to recent studies on relational contracting economics and behavioral finance, joint projects of investment can be considered as special relational environments where the project's returns improve on alternativ...

  18. Creating public value : Optimizing cooperation Between public and private Partners in infrastructure Projects

    NARCIS (Netherlands)

    Koops, L.S.W.

    2017-01-01

    Infrastructure projects - such as the construction of tunnels and bridges or the (re)construction of roads and highways – are always performed to add quality to society. In The Netherlands, these projects are most often financed by the government, from local to national level, and constructed by

  19. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W; Syffus, Rainer

    2014-01-01

    This book offers a timely review of map projections including sphere, ellipsoid, rotational surfaces, and geodetic datum transformations. Coverage includes computer vision, and remote sensing space projective mappings in photogrammetry.

  20. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  1. `95 computer system operation project

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new.

  2. '95 computer system operation project

    International Nuclear Information System (INIS)

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new

  3. Raising Cultural Self-Efficacy among Faculty and Staff of a Private Native Hawaiian School System

    Science.gov (United States)

    Fong, Randie Kamuela

    2012-01-01

    The Hawaiian cultural revitalization movement in Hawai`i is an important driver for many Hawaiian organizations as well as educational institutions that serve Native Hawaiians. One such organization is Kamehameha Schools, a private school system founded and endowed by Princess Bernice Pauahi Bishop in 1887 to educate Native Hawaiian children. From…

  4. The Effectiveness of an Electronic Security Management System in a Privately Owned Apartment Complex

    Science.gov (United States)

    Greenberg, David F.; Roush, Jeffrey B.

    2009-01-01

    Poisson and negative binomial regression methods are used to analyze the monthly time series data to determine the effects of introducing an integrated security management system including closed-circuit television (CCTV), door alarm monitoring, proximity card access, and emergency call boxes to a large privately-owned complex of apartment…

  5. 77 FR 28797 - Redundancy of Communications Systems: Backup Power Private Land Mobile Radio Services: Selection...

    Science.gov (United States)

    2012-05-16

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Parts 12 and 90 [DA 11-1838] Redundancy of Communications Systems: Backup Power Private Land Mobile Radio Services: Selection and Assignment of Frequencies, and Transition of the Upper 200 Channels in the 800 MHz Band to EA Licensing AGENCY: Federal Communications...

  6. Second Line of Defense Virtual Private Network Guidance for Deployed and New CAS Systems

    Energy Technology Data Exchange (ETDEWEB)

    Singh, Surya V.; Thronas, Aaron I.

    2010-01-01

    This paper discusses the importance of remote access via virtual private network (VPN) for the Second Line of Defense (SLD) Central Alarm System (CAS) sites, the requirements for maintaining secure channels while using VPN and implementation requirements for current and future sites.

  7. UCH-II, private power project, Dera Murad Jamali, Pakistan. Export trade information

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    Energy Resources International and Power Development Company of Pakistan in association with General Electric Corporation, Inc. offers to build, finance, own and operate a 500+ MW combined cycle natural gas electric power plant, near Dera Murad Jamali, Pakistan. The basis for the undertaking is a carefully balanced and integrated series of contracts for fuel, power purchase, and implementation of the proposed project. The contracts would be established between the Government of Pakistan (GOP), its agencies and instrumentalities, Energy Resources International with Power Development Company and its associates, and a Project Company organized specifically for the undertaking. The report describes the project.

  8. The System Dynamics Research on the Private Cars' Amount in Beijing

    Science.gov (United States)

    Fan, Jie; Yan, Guang-Le

    The thesis analyzes the development problem of private cars’ amount in Beijing from the perspective of system dynamics. With the flow chart illustrating the relationships of relevant elements, the SD model is established by VENSIM to simulate the growth trend of private autos’ amount in the future on the background of “Public Transportation First” policy based on the original data in Beijing. Then the article discusses the forecasting impacts of “Single-and-double license plate number limit” on the number of city vehicles and private cars under the assumption that this policy implemented for long after the 2008 Olympic Games. Finally, some recommendations are put forward for proper control over this problem.

  9. Once the shovel hits the ground : Evaluating the management of complex implementation processes of public-private partnership infrastructure projects with qualitative comparative analysis

    NARCIS (Netherlands)

    S. Verweij (Stefan)

    2015-01-01

    markdownabstractAbstract Much attention is being paid to the planning of public-private partnership (PPP) infrastructure projects. The subsequent implementation phase – when the contract has been signed and the project ‘starts rolling’ – has received less attention. However, sound agreements

  10. Marketing Promotion and Distribution of Project within Private and Public Sphere

    Directory of Open Access Journals (Sweden)

    Rastislav Kerul

    2008-06-01

    Full Text Available The topic of marketing implementation within project management is out of interest of many authors. There are a few literature sources related to the theme. Our science interest is to analyze and outline the main possibilities of marketing conception implementation within project realization in order to make their distribution and promotion effective to reach the target groups and publics. We try to describe main basis of marketing perspective in managing projects in relation to target groups, to which the project would be defined and it would reach it directly or indirectly. The main aim of the study is to analyze the possibilities of project preparation and implementation with the support of direct and effective marketing mix with emphasis on promotion and distribution policy. The project would be seen as a product within this marketing mix and the price is not considered to be that interesting as it is given by the national law and concrete priority call. The communication policy as well as distribution strategy must be designed in relation to expectations and needs of target groups which might vary in their age, sex, life standard, demography characteristics, etc.

  11. The growth of corporate private hospitals in Malaysia: policy contradictions in health system pluralism.

    Science.gov (United States)

    Barraclough, S

    1997-01-01

    The rapid growth of corporate investment in the Malaysian private hospital sector has had a considerable impact on the health care system. Sustained economic growth, the development of new urban areas, an enlarged middle class, and the inclusion of hospital insurance in salary packages have all contributed to a financially lucrative investment environment for hospital entrepreneurs. Many of Malaysia's most technologically advanced hospitals employing leading specialists are owned and operated as corporate business ventures. Corporate hospital investment has been actively encouraged by the government, which regards an expanded private sector as a vital complement to the public hospital system. Yet this rapid growth of corporately owned private hospitals has posed serious contradictions for health care policy in terms of issues such as equity, cost and quality, the effect on the wider health system, and the very role of the state in health care provision. This article describes the growth of corporate investment in Malaysia's private hospital sector and explores some of the attendant policy contradictions.

  12. Public-Privat e Partnership in the System of Regional Healthcare Financing

    Directory of Open Access Journals (Sweden)

    Margarita Yur’evna Molchanova

    2016-05-01

    Full Text Available Healthcare financing reform in the Russian Federation, besides its positive consequences, has led to the emergence of several major organizational and economic problems that hinder the expansion of financing sources for this sphere, which also involves public-private partnership (PPP. The paper highlights the regional specifics of such healthcare projects compared to similar projects of other spheres of the national economy. The author describes the problems of PPP projects implementation in healthcare; they include the insufficiency of substantiation of public-private partnership application in healthcare, and the absence of typical models for establishment of relations between PPP participants. The paper presents the healthcare priorities put forward by the author; these priorities are based on the theory of the life cycle of a service. The author presents her own model for organizing a regional concession, which is the most common form of public-private partnership in healthcare so far. The cluster brings together on a voluntary basis the legally independent organizations that are interested in improving the quality and increasing the accessibility of health services. These can include medical institutions of various forms of ownership located in the region, clinics, facilities, institutions that train healthcare workers, authorities, etc. The author shows that a favorable environment for the formation and implementation of PPP projects can be created under the cluster approach to the organization of healthcare. When establishing the medical cluster, the main task is to organize interaction between all its subjects in the interest of the overall development of healthcare in the region and the implementation of one’s own interests

  13. Web-based Project Reporting System

    Data.gov (United States)

    US Agency for International Development — Web-PRS is a web-based system that captures financial information and project status information that is sortable by geographical location, pillar, project type and...

  14. [Public-private relations in the Colombian health system from 1991 to 2015].

    Science.gov (United States)

    Cárdenas, William Iván López; Pereira, Adelyne Maria Mendes; Machado, Cristiani Vieira

    2017-07-27

    The case of Colombia's health system exemplifies the neoliberal reforms conducted in Latin America, characterized by the private sector's broad participation in the administration of resources and provision of health services. The system includes a set of benefits for persons that can afford to pay and a package of basic services with state financing for poor persons. This study aimed to analyze the public-private arrangements in the Colombian health system from 1991 and 2015, including the dimensions of insurance and financing. A case study was performed that included a literature review and analysis of documents and secondary data. The results suggest that the 1993 reform conceived of health as a public service to be provided by the market. There were changes in the state's role, delegating health care functions to the private sector through regulatory and contractual measures. Beginning in 2000, incremental reforms included instrumental changes in the system, while other initiatives aimed to expand the state's responsibilities in guaranteeing the right to health. In terms of health insurance, the main advances were the expansion of insurance coverage and harmonization of baskets of benefits between different insurance systems (although late). As for financing, there are important inequities in per capita spending between the different insurance systems and inefficiency in the financial intermediation. The Colombian case underscores the limits of structuring health systems with heavy market participation, and the study contributes to the debate on the challenges for social protection in health in Latin American countries.

  15. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  16. IMPACTS OF TIMBER LEGALITY VERIFICATION SYSTEM IMPLEMENTATION ON THE SUSTAINABILITY OF TIMBER INDUSTRY AND PRIVATE FOREST

    Directory of Open Access Journals (Sweden)

    Elvida Yosefi Suryandari

    2017-04-01

    Full Text Available International market requires producers to proof the legality of their wood products to address the issues of illegal logging and illegal trade. Timber Legality Verification System (TLVS has been prepared by the Government of Indonesia that covering the upstream and downstream wood industries. This paper aims to evaluate gaps in the implementation of TLVS policy and its impact on the sustainability of timber industry. This study was using gap, descriptive and costs-structure analyzes. The study was conducted in three provinces, namely: DKI Jakarta, West Java and D.I. Yogyakarta. Research found that the effectiveness of the TLVS implementation was low due to relatively rapid policy changes. This situation became disincetive for investments in timber business. Private sector perceived that TLVS policy should be applied in the upstream of timber business. Hence, the industry and market in the downstream have not been fully support to this system. Furthermore, TLVS policy implementation was considered ineffective by timber industry as well as private forest managers, especially by micro industry and smallholder private forests. This situation threatened the sustainability of timber industry and private forests. Therefore, Institutions should be strengthened in order to improve the quality of human resources and the competitiveness of products.

  17. Hospitalization flow in the public and private systems in the state of Sao Paulo, Brazil.

    Science.gov (United States)

    Rocha, Juan Stuardo Yazlle; Monteiro, Rosane Aparecida; Moreira, Marizélia Leão

    2015-01-01

    OBJECTIVE To describe the migration flows of demand for public and private hospital care among the health regions of the state of Sao Paulo, Brazil.METHODS Study based on a database of hospitalizations in the public and private systems of the state of Sao Paulo, Southeastern Brazil, in 2006. We analyzed data from 17 health regions of the state, considering people hospitalized in their own health region and those who migrated outwards (emigration) or came from other regions (immigration). The index of migration effectiveness of patients from both systems was estimated. The coverage (hospitalization coefficient) was analyzed in relation to the number of inpatient beds per population and the indexes of migration effectiveness.RESULTS The index of migration effectiveness applied to the hospital care demand flow allowed characterizing health regions with flow balance, with high emigration of public and private patients, and with high attraction of public and private patients.CONCLUSIONS There are differences in hospital care access and opportunities among health regions in the state of Sao Paulo, Brazil.

  18. Towards a private-public synergy in financing climate change mitigation projects

    NARCIS (Netherlands)

    Zhang, ZX; Maruyama, A

    2001-01-01

    Funding for greenhouse gas mitigation projects in developing countries is crucial for addressing the global climate change problem. By examining current climate change-related financial mechanisms and their limitations, this paper indicates that their roles are limited in affecting developing

  19. Private Sector/Educator Collaboration: Project Improves Financial, Economic Literacy of America's Youth

    Science.gov (United States)

    Haynes, Deborah C.; Chinadle, Nicole

    2007-01-01

    The Family Economics and Financial Education Project (FEFE) began in 2001 at Montana State University with an annual grant from Take Charge America, Inc., a credit counseling and debt management company headquartered in Phoenix, Arizona. FEFE's mission is to provide educators with curriculum materials and training to be effective teachers of…

  20. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  1. Advantages and risks of foreign investors' participation in the projects of public-private partnership

    OpenAIRE

    I. Bohdan

    2013-01-01

    The purpose of this article is investigating the role of foreign investments in a contemporary globalized economy as a factor of acceleration of the national economic development. Based on the analysis of international trends in the investment projects involving foreign investors the author proves that active gross fixed capital formation, particularly in low- and middle-income countries, is largely determined by the availability of efficient mechanisms to attract foreign investments into the...

  2. Coordinate systems and map projections

    CERN Document Server

    Maling, DH

    1992-01-01

    A revised and expanded new edition of the definitive English work on map projections. The revisions take into account the huge advances in geometrical geodesy which have occurred since the early years of satellite geodesy. The detailed configuration of the geoid resulting from the GEOS and SEASAT altimetry measurements are now taken into consideration. Additionally, the chapter on computation of map projections is updated bearing in mind the availability of pocket calculators and microcomputers. Analytical derivation of some map projections including examples of pseudocylindrical and polyconic

  3. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  4. Tank waste remediation system (TWRS) privatization contractor samples waste envelope D material 241-C-106

    Energy Technology Data Exchange (ETDEWEB)

    Esch, R.A.

    1997-04-14

    This report represents the Final Analytical Report on Tank Waste Remediation System (TWRS) Privatization Contractor Samples for Waste Envelope D. All work was conducted in accordance with ''Addendum 1 of the Letter of Instruction (LOI) for TWRS Privatization Contractor Samples Addressing Waste Envelope D Materials - Revision 0, Revision 1, and Revision 2.'' (Jones 1996, Wiemers 1996a, Wiemers 1996b) Tank 241-C-1 06 (C-106) was selected by TWRS Privatization for the Part 1A Envelope D high-level waste demonstration. Twenty bottles of Tank C-106 material were collected by Westinghouse Hanford Company using a grab sampling technique and transferred to the 325 building for processing by the Pacific Northwest National Laboratory (PNNL). At the 325 building, the contents of the twenty bottles were combined into a single Initial Composite Material. This composite was subsampled for the laboratory-scale screening test and characterization testing, and the remainder was transferred to the 324 building for bench-scale preparation of the Privatization Contractor samples.

  5. The Generalizability of Private Sector Research on Software Project Management in Two USAF Organizations: An Exploratory Study

    National Research Council Canada - National Science Library

    Garman, Michael

    2003-01-01

    .... But most of this research in peer reviewed journals has focused on the private sector. Researchers have also identified software acquisitions as one of the major differences between the private sector and public sector MIS...

  6. Synthesis of public-private partnerships : potential issues and best practices for program and project implementation and administration.

    Science.gov (United States)

    2015-08-01

    Public-private partnerships (P3s or PPPs) offer an innovative procurement method for the public sector. : P3s involve collaborations between the public and private sectors to finance, develop or maintain transportation : infrastructure. In an era of ...

  7. Facilities management innovation in public-private collaborations: Danish ESCO projects

    DEFF Research Database (Denmark)

    Nardelli, Giulia; Jensen, Jesper Ole; Nielsen, Susanne Balslev

    2015-01-01

    The purpose of the article is to investigate how Facilities Management (FM) units navigate Energy Service Company (ESCO) collaborations, here defined as examples of public collaborative innovation within the context of FM. The driving motivation is to inform and inspire internal FM units of local...... institutions on how to navigate and manage collaboration of different, intra- and inter-organisational actors throughout ESCO projects.......The purpose of the article is to investigate how Facilities Management (FM) units navigate Energy Service Company (ESCO) collaborations, here defined as examples of public collaborative innovation within the context of FM. The driving motivation is to inform and inspire internal FM units of local...

  8. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  9. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    CERTA PJ

    2008-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  10. Involving private healthcare practitioners in an urban NCD sentinel surveillance system: lessons learned from Pune, India.

    Science.gov (United States)

    Kroll, Mareike; Phalkey, Revati; Dutta, Sayani; Shukla, Sharvari; Butsch, Carsten; Bharucha, Erach; Kraas, Frauke

    2016-01-01

    Despite the rising impact of non-communicable diseases (NCDs) on public health in India, lack of quality data and routine surveillance hampers the planning process for NCD prevention and control. Current surveillance programs focus largely on communicable diseases and do not adequately include the private healthcare sector as a major source of care in cities. The objective of the study was to conceptualize, implement, and evaluate a prototype for an urban NCD sentinel surveillance system among private healthcare practitioners providing primary care in Pune, India. We mapped all private healthcare providers in three selected areas of the city, conducted a knowledge, attitude, and practice survey with regard to surveillance among 258 consenting practitioners, and assessed their willingness to participate in a routine NCD surveillance system. In total, 127 practitioners agreed and were included in a 6-month surveillance study. Data on first-time diagnoses of 10 selected NCDs alongside basic demographic and socioeconomic patient information were collected onsite on a monthly basis using a paper-based register. Descriptive and regression analyses were performed. In total, 1,532 incident cases were recorded that mainly included hypertension ( n =622, 41%) and diabetes ( n =460, 30%). Dropout rate was 10% ( n =13). The monthly reporting consistency was quite constant, with the majority ( n =63, 50%) submitting 1-10 cases in 6 months. Average number of submitted cases was highest among allopathic practitioners (17.4). A majority of the participants ( n =104, 91%) agreed that the surveillance design could be scaled up to cover the entire city. The study indicates that private primary healthcare providers (allopathic and alternate medicine practitioners) play an important role in the diagnosis and treatment of NCDs and can be involved in NCD surveillance, if certain barriers are addressed. Main barriers observed were lack of regulation of the private sector, cross

  11. Choosing the route to traveler information systems deployment : decision factors for creating public/private business plans

    Science.gov (United States)

    1998-01-01

    Advanced traveler information systems (ATIS) are moving beyond the research stage to become fully integrated elements of urban transportation management systems. By definition, ATIS work best when multiple public and private organizations are able to...

  12. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    Certa, P.J.; Kirkbride, R.A.; Hohl, T.M.; Empey, P.A.; Wells, M.N.

    2009-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  13. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and

  14. ZebraLancer: Private and Anonymous Crowdsourcing System atop Open Blockchain

    OpenAIRE

    Lu, Yuan; Tang, Qiang; Wang, Guiling

    2018-01-01

    We design and implement the first private and anonymous decentralized crowdsourcing system ZebraLancer. It realizes the fair exchange (i.e. security against malicious workers and dishonest requesters) without using any third-party arbiter. More importantly, it overcomes two fundamental challenges of decentralization, i.e. data leakage and identity breach. First, our outsource-then-prove methodology resolves the critical tension between blockchain transparency and data confidentiality without ...

  15. Tank waste remediation system privatization infrastructure program configuration management implementation plan

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program's products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control

  16. Responsiveness of the health insurance and private systems in Alexandria, Egypt.

    Science.gov (United States)

    Mosallam, Rasha A; Aly, Mahmoud M; Moharram, Ahmed M

    2013-04-01

    Responsiveness to patients is a key indicator for measuring the health system performance with respect to nonhealth aspects. This study aimed to compare responsiveness of the Health Insurance Organization (HIO) with the private healthcare system and also to assess the importance of the different responsiveness domains according to the study population's perspective. Patients attending both inpatient and outpatient settings of both organizations were interviewed (200 outpatients and 200 inpatients from each selected hospital) using the WHO questionnaire. The questionnaire elicits the ratings of the respondents on their experiences with the healthcare system over the past 12 months in terms of responsiveness domains, respondents' inability to access medical care because of financial barriers, and their ranking of the relative importance of responsiveness domains. Almost twice the number of HIO participants reported poor responsiveness compared with the private organization participants (27.8 vs. 56.8%, respectively). The outpatient setting scored much favorably compared with the inpatient setting at the HIO (52.3% of respondents reported poor responsiveness in the outpatient setting compared with 76.3% in the inpatient setting); however, they were comparable in the private setting. Communication, prompt attention, and dignity were the domains most frequently rated as the most important (36.0, 32.0, and 14.7%, respectively). The type of organization (HIO vs. private organization) and setting of care (inpatient vs. outpatient) were significant predictors of responsiveness score (Pprivate sector. The results emphasize the importance of establishment of systems for monitoring the performance of the providers and discontinuation of the services for the nonperformers.

  17. CONSIDERATIONS REGARDING THE IMPLEMENTATION OF A PERFORMANCE MANAGEMENT SYSTEM IN PRIVATE HOSPITALS

    Directory of Open Access Journals (Sweden)

    Marian TAICU

    2013-09-01

    Full Text Available Obtaining performance in private hospitals require a proper management of costs and implementing a situation for performance monitoring. The implementation of a cost calculation method in hospitals is a complex process that must take into account the particularities of the activity in health care system. This paper presents a comparative analysis of four costing methods and a model of performance monitoring situation, adapted to the specific of the hospitals.

  18. Reforms are needed to increase public funding and curb demand for private care in Israel's health system.

    Science.gov (United States)

    Chernichovsky, Dov

    2013-04-01

    Historically, the Israeli health care system has been considered a high-performance system, providing universal, affordable, high-quality care to all residents. However, a decline in the ratio of physicians to population that reached a modern low in 2006, an approximate ten-percentage-point decline in the share of publicly financed health care between 1995 and 2009, and legislative mandates that favored private insurance have altered Israel's health care system for the worse. Many Israelis now purchase private health insurance to supplement the state-sponsored universal care coverage, and they end up spending more out of pocket even for services covered by the entitlement. Additionally, many publicly paid physicians moonlight at private facilities to earn more money. In this article I recommend that Israel increase public funding for health care and adopt reforms to address the rising demand for privately funded care and the problem of publicly paid physicians who moonlight at private facilities.

  19. Private and Public Sector Enterprise Resource Planning System Post-Implementation Practices: A Comparative Mixed Method Investigation

    Science.gov (United States)

    Bachman, Charles A.

    2010-01-01

    While private sector organizations have implemented enterprise resource planning (ERP) systems since the mid 1990s, ERP implementations within the public sector lagged by several years. This research conducted a mixed method, comparative assessment of post "go-live" ERP implementations between public and private sector organization. Based on a…

  20. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  1. User-Oriented Project Accounting System.

    Science.gov (United States)

    Hess, Larry G.; Alcorn, Lisa S.

    1990-01-01

    The project accounting system used by the University of Illinois Urbana-Champaign School of Chemical Sciences exchanges financial data with the campus' central accounting system and allows integration of this information with user-entered data to produce an easily read, fully obligated project accounting statement for the budget and period…

  2. Mechanisms to Support Private Enterprise in the System of State Capitalism

    Directory of Open Access Journals (Sweden)

    Bogoutdinov Boris, B.

    2016-07-01

    Full Text Available Some of the main problems in developing the institute of private enterprise in Russia are ineffectiveness of government support and lack of competence among the entrepreneurs themselves. In the paper the author analyzes the existing mechanisms of business development for small and mediumsized businesses, which in case of effective implementation will drive up the share of self employment, tax revenue and quality of life. The aim of the paper is to develop methods and tools for development of private enterprise institute pursuing the task of forming a highly developed modern society. The mechanisms of support for small entrepreneurs in China, as well as problems of search funds and mittelshtands mechanisms were considered. The practical significance lies in the analysis of the existing enabling mechanism for small and medium-sized businesses with the purpose of development of new mechanisms of transformation of economic systems in Russia.

  3. SYSTEM EXPERTISE TRAINING COURSES IN PRIVATE SECTOR: Can They Be Given Online?

    Directory of Open Access Journals (Sweden)

    Birim BALCI DEMIRCI

    2014-04-01

    Full Text Available It is widely known that there are many schools in the private sector offering courses in Computer Technology, Computer Engineering, Information Systems and similar disciplines in addition to Universities presenting such courses. The private sector programs are extremely popular with students already studying at university as well as being of great interest to previously graduated university students. The first purpose of this study is to determine the percentage of university students who attend theses education programs. Both previously graduated and presently studying students have been included. Secondly it aims to understand the reasons behind the attendance of such courses by students who are already studying a similar curriculum or have previously studied and graduated in similar and related fields. In the light of this information, some suggestions have been made about giving these courses as online.

  4. Systems engineering real estate development projects

    Science.gov (United States)

    Gusakova, Elena; Titarenko, Boris; Stepanov, Vitaliy

    2017-10-01

    In recent years, real estate development has accumulated a wealth of experience in implementing major projects, which requires comprehension and systematization. The scientific instrument of system engineering is studied in the article and is substantively interpreted with reference to real estate development projects. The most perspective approaches and models are substantiated, allowing strategically to plan the life cycle of the project as a whole, and also to solve the engineering butt problems of the project. The relevance of further scientific studies of regularities and specifics of the life cycle of real estate development projects conducted at the Moscow State University of Economics and Management at the ISTA department is shown.

  5. Quantity Surveying Undergraduates’ Awareness on Cost Significant of High-Rise Condominium Projects in Malaysia: The Case of a Private University in Malaysia

    OpenAIRE

    Peng Lee Wah; Seng Ng See; Choon Toh Tien; Sim Lim Cheng; Khian Yong Ching; Chen Goh Kai

    2016-01-01

    Recent developments in quantity surveying (QS) emphasised the importance of identifying cost significant elements (CSE). The knowledge on CSE of high-rise condominium projects (HRCP) is essential as high-rise residential multi-unit projects are the next option in building construction due to limited land areas in urban areas. This study aims to determine the levels of awareness among QS undergraduates of a private university in Malaysia on CSE of HRCP in Malaysia. The respondents’ knowledge o...

  6. A study of penetration test for applying a remote monitoring system for virtual private network

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. S.; Park, I. J.; Min, K. S.; Choi, Y. M. [KAERI, Taejon (Korea, Republic of); Jo, D. K. [A3 Security Consulting Co., Seoul (Korea, Republic of)

    2003-07-01

    A penetration test has been performed to verify the vulnerability of Virtual Private Network that is substitute for communication method of an existing remote monitoring system. An existing RMS was used for the private telephone and the RMS was applied of all PWR in Korea. But, due to communication fee, IAEA wanted to replace current telephone line to the internet line to reduce transmission cost in operating remote monitoring system. The communication cost of telephone line was estimated about $66,000/yr. Internet technology would reduce the operating cost up to 1/5. The purpose of the penetration test was to demonstrate the security of the data and system against both various external and internal hacking scenarios. In most cases, hacker could not even identify the VPN system. In any cases, the system did not allow the access of the hacker to the system needless to say the data alteration or system shutdown. Two kinds of test method is chosen; one is external attack and another is internal attack. During the test, the hacking tool was used. The result of test was proved that VPN was secure against internal/external attack.

  7. A study of penetration test for applying a remote monitoring system for virtual private network

    International Nuclear Information System (INIS)

    Kim, J. S.; Kim, J. S.; Park, I. J.; Min, K. S.; Choi, Y. M.; Jo, D. K.

    2003-01-01

    A penetration test has been performed to verify the vulnerability of Virtual Private Network that is substitute for communication method of an existing remote monitoring system. An existing RMS was used for the private telephone and the RMS was applied of all PWR in Korea. But, due to communication fee, IAEA wanted to replace current telephone line to the internet line to reduce transmission cost in operating remote monitoring system. The communication cost of telephone line was estimated about $66,000/yr. Internet technology would reduce the operating cost up to 1/5. The purpose of the penetration test was to demonstrate the security of the data and system against both various external and internal hacking scenarios. In most cases, hacker could not even identify the VPN system. In any cases, the system did not allow the access of the hacker to the system needless to say the data alteration or system shutdown. Two kinds of test method is chosen; one is external attack and another is internal attack. During the test, the hacking tool was used. The result of test was proved that VPN was secure against internal/external attack

  8. The embedded operating system project

    Science.gov (United States)

    Campbell, R. H.

    1984-01-01

    This progress report describes research towards the design and construction of embedded operating systems for real-time advanced aerospace applications. The applications concerned require reliable operating system support that must accommodate networks of computers. The report addresses the problems of constructing such operating systems, the communications media, reconfiguration, consistency and recovery in a distributed system, and the issues of realtime processing. A discussion is included on suitable theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based systems. In particular, this report addresses: atomic actions, fault tolerance, operating system structure, program development, reliability and availability, and networking issues. This document reports the status of various experiments designed and conducted to investigate embedded operating system design issues.

  9. The embedded operating system project

    Science.gov (United States)

    Campbell, R. H.

    1985-01-01

    The design and construction of embedded operating systems for real-time advanced aerospace applications was investigated. The applications require reliable operating system support that must accommodate computer networks. Problems that arise in the construction of such operating systems, reconfiguration, consistency and recovery in a distributed system, and the issues of real-time processing are reported. A thesis that provides theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based system is included. The following items are addressed: (1) atomic actions and fault-tolerance issues; (2) operating system structure; (3) program development; (4) a reliable compiler for path Pascal; and (5) mediators, a mechanism for scheduling distributed system processes.

  10. Does the private sector receive an excessive return from investments in health care infrastructure projects? Evidence from the UK.

    Science.gov (United States)

    Vecchi, Veronica; Hellowell, Mark; Gatti, Stefano

    2013-05-01

    This paper is concerned with the cost-efficiency of Private Finance Initiatives (PFIs) in the delivery of hospital facilities in the UK. We outline a methodology for identifying the "fair" return on equity, based on the Weighted Average Cost of Capital (WACC) of each investor. We apply this method to assess the expected returns on a sample of 77 contracts signed between 1997 and 2011 by health care provider organisations in the UK. We show that expected returns are in general in excess of the WACC benchmarks. The findings highlight significant problems in current procurement practices and the methodologies by which bids are assessed. To minimise the financial impact of hospital investments on health care systems, a regulatory regime must ensure that expected returns are set at the "fair" rate. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  11. An Empirical Study for the Mobile Food Trace ability: Private Trace ability System for the White Gourd in Tianjin, China

    Directory of Open Access Journals (Sweden)

    Liu Yu-Chuan

    2016-01-01

    Full Text Available As the food supply chain globalization became inevitable, transparency in the way agriculture was grown and handled throughout the supply chain process resulted in an important issue of ‘traceability’ in global food trade and safety for health management. Traceability in agriculture is faced with the technological challenges including food product label and identification, activity/process characterization, information systems for data capture, analysis, storage, and the integration of the overall traceable data for the supply chain, i.e., from farm to table. While some field data can be automatically acquired and transmitted by sensor networking, most agricultural activity information was recorded by manual handwriting for the traceability information systems. System architecture, operation scenarios, and the implementation examples for the mobile farming data collection system to automatically record the agricultural activities information for famers were proposed in this research. The farming information for farming activities is coded in two-dimensional labels of quick response (QR codes. By scanning the proper operation labels, the corresponding farming data can be captured and uploaded simultaneously to the back-end web server. A collaborative research project for the traceability of white gourd planting in Tianjin was performed. The system can be implemented for public traceability system data collection and importing, as well as playing the roles of a private traceability system. The consumers’ confidence for healthy food choices with clear food traceability can be improved.

  12. Evaluating the role of private investment in infrastructure assets.

    Science.gov (United States)

    2015-10-01

    Public Private Partnership (P3) projects are likely to fundamentally impact entire : transportation systems. However, most studies are focused on system modeling rather than : policy analysis, and few studies have examined the impacts of P3s on real-...

  13. Hospital information system institutionalization processes in indonesian public, government-owned and privately owned hospitals.

    Science.gov (United States)

    Handayani, P W; Hidayanto, A N; Ayuningtyas, Dumilah; Budi, Indra

    2016-11-01

    The Hospital Information System (HIS) could help hospitals as a public entity to provide optimal health services. One of the main challenges of HIS implementation is an institutional change. Using institutional theory as the analytical lens, this study aims to explain the institutionalization of HIS as an instance of e-health initiatives in Indonesia. Furthermore, this paper aims for hospital management and researchers to improve the understanding of the social forces that influence hospital personnel's HIS acceptance within an organizational context. We use case studies from four public, government-owned hospitals and four privately owned (public and specialty) hospitals to explain the HIS institutionalization process by exploring the three concepts of institutional theory: institutional isomorphism, institutional logic, and institutional entrepreneurship. This study reveals that differences exist between public, government-owned and private hospitals with regard to the institutionalization process: public, government-owned hospitals' management is more motivated to implement HIS to comply with the regulations, while private hospitals' management views HIS as an urgent requirement that must be achieved. The study findings also reveal that various institutional isomorphism mechanisms and forms of institutional logic emerge during the process. Finally, three factors-self-efficacy, social influence, and management support-have a significant influence on the individual acceptance of HIS. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  14. Project Management Plan for Initial Tank Retrieval Systems, Project W-211

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    1999-01-01

    Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AP-108, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the Privatized waste processing plant and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump based retrieval system for any DST. This Project Management Plan (PMP) documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  15. Preventing Elder Abuse: The Texas Plan for a Coordinated Service Delivery System. Collaborative Elder Abuse Prevention Project.

    Science.gov (United States)

    McDaniel, Garry L.

    The Texas Department of Human Services, in collaboration with 13 other public and private organizations, co-sponsored a statewide Collaborative Elder Abuse Prevention project. The goal of this project is to develop a comprehensive, long-range plan for the prevention of elder abuse, a method for achieving a coordinated service delivery system for…

  16. Rebuilding and the private cloud of the hospital information system by the virtualization technology.

    Science.gov (United States)

    Yamashita, Yoshinori; Ogaito, Tatoku

    2013-01-01

    In our hospital, we managed an electronic health record system and many section subsystems as a hospital information system. By the expansion of these information systems, a system becomes complicated, and maintenance and operative cost increased. Furthermore, the environment that is available to medical information is demanded anywhere anytime by expansion of the computerization. However, the expansion of the information use becomes necessary for the expansion such as the personal protection of information for security. We became rebuilding and the private cloud of the hospital information system by the virtualization technology to solve such a problem. As a result, we were able to perform a decrease in number of the servers which constituted a system, a decrease in network traffic, reduction of the operative cost.

  17. TidGen Power System Commercialization Project

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, Christopher R. [President & CEO; McEntee, Jarlath [VP Engineering & CTO

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric

  18. Private investment in hospitals: a comparison of three healthcare systems and possible implications for real estate strategies.

    Science.gov (United States)

    van der Zwart, Johan; van der Voordt, Theo; Jonge, Hans de

    2010-01-01

    This article explores lessons to be learned from three different healthcare systems and the possible implications for the management of healthcare real estate, in particular in connection to the Dutch system. It discusses similarities and differences among the different systems, in search of possible consequences on cost, financing, and design innovation. To keep healthcare affordable in the future, the Dutch government is currently in the process of changing legislation to move from a centrally directed system to a so-called regulated market system. The deregulation of real estate investment that accompanies the new healthcare delivery system offers healthcare organizations new opportunities, but also more responsibility and greater risk in return on investment. Consequently, healthcare organizations must find new methods of financing. Private investment is one of the options. Three healthcare systems were analyzed on the basis of a literature review and document analysis, then schematized to show similarities and dissimilarities with regard to private investment in hospitals. Observations are based on a selection of recently published articles on private-sector financing and its implications for healthcare real estate decision making in the Netherlands, the United Kingdom, and Germany. The strengths and weaknesses of three healthcare systems with differing proportions of private and public investment in hospitals were explored. Research revealed a gap between intended effects and actual effects with regard to quality and cost. Costly private finance does not necessarily lead to "value for money." Transferring real estate decisions to private investors decreases the influence of the healthcare organization on future costs and quality. The three healthcare systems show substantial differences between public and private responsibilities. Less governmental involvement affords both opportunities and risks for hospitals. Private investment may lead to innovation

  19. Portable Data Acquisition System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Armstrong researchers have developed a portable data acquisition system (PDAT) that can be easily transported and set up at remote locations to display and archive...

  20. Facilities projects performance measurement system

    International Nuclear Information System (INIS)

    Erben, J.F.

    1979-01-01

    The two DOE-owned facilities at Hanford, the Fuels and Materials Examination Facility (FMEF), and the Fusion Materials Irradiation Test Facility (FMIT), are described. The performance measurement systems used at these two facilities are next described

  1. Implementing polytope projects for smart systems

    CERN Document Server

    Iordache, Octavian

    2017-01-01

    This book presents a domain of extreme industrial and scientific interest: the study of smart systems and structures. It presents polytope projects as comprehensive physical and cognitive architectures that support the investigation, fabrication and implementation of smart systems and structures. These systems feature multifunctional components that can perform sensing, control, and actuation. In light of the fact that devices, tools, methodologies and organizations based on electronics and information technology for automation, specific to the third industrial revolution, are increasingly reaching their limits, it is essential that smart systems be implemented in industry. Polytope projects facilitate the utilization of smart systems and structures as key elements of the fourth industrial revolution. The book begins by presenting polytope projects as a reference architecture for cyber-physical systems and smart systems, before addressing industrial process synthesis in Chapter 2. Flow-sheet trees, cyclic sep...

  2. 2015 Plan. Project 9: the institutional base reformulation of electrical sector and the participation of private capital

    International Nuclear Information System (INIS)

    1992-12-01

    The structural changes in the electrical sector and the forecast for favoring the private participation in the investments of the sector are discussed, describing the main stages of the institutional evolution. Some economic markers as competitiveness, electric power prices, private capital and the regulations of electric power services are presented. (C.G.C)

  3. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  4. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  5. Pregnancy complications in Brazilian puerperal women treated in the public and private health systems 1

    Science.gov (United States)

    Varela, Patrícia Louise Rodrigues; de Oliveira, Rosana Rosseto; Melo, Emiliana Cristina; Mathias, Thais Aidar de Freitas

    2018-01-01

    ABSTRACT Objective: to analyze the prevalence of pregnancy complications and sociodemographic profile of puerperal patients with complications, according to the form of financing of the childbirth service. Method: cross-sectional study with interview of 928 puerperal women whose childbirth was financed by the Unified Health System, health plans and private sources (other sources than the Unified Health System). The sample was calculated based on the births registered in the Information System on Live Births, stratified by hospital and form of financing of the childbirth service. Data were analyzed using the chi-square and Fisher’s exact tests. Results: the prevalence was 87.8% for all puerperal women, with an average of 2.4 complications per woman. In the case of deliveries covered by the Unified Health System, urinary tract infection (38.2%), anemia (26.0%) and leucorrhea (23.5%) were more frequent. In turn, vaginal bleeding (26.4%), urinary tract infection (23.9%) and leucorrhoea (23.7%) were prevalent in deliveries that were not covered by the Unified Health System. Puerperal women that had their delivery covered by the Unified Health System reported a greater number of intercurrences related to infectious diseases, while women who used health plans and private sources reported intercurrences related to chronic diseases. A higher frequency of puerperal adolescents, non-white women, and women without partner among those assisted in the Unified Health System (p < 0.001). Conclusion: the high prevalence of complications indicates the need for monitoring and preventing diseases during pregnancy, especially in the case of pregnant women with unfavorable sociodemographic characteristics. PMID:29319740

  6. Pregnancy complications in Brazilian puerperal women treated in the public and private health systems

    Directory of Open Access Journals (Sweden)

    Patrícia Louise Rodrigues Varela

    2018-01-01

    Full Text Available ABSTRACT Objective: to analyze the prevalence of pregnancy complications and sociodemographic profile of puerperal patients with complications, according to the form of financing of the childbirth service. Method: cross-sectional study with interview of 928 puerperal women whose childbirth was financed by the Unified Health System, health plans and private sources (other sources than the Unified Health System. The sample was calculated based on the births registered in the Information System on Live Births, stratified by hospital and form of financing of the childbirth service. Data were analyzed using the chi-square and Fisher’s exact tests. Results: the prevalence was 87.8% for all puerperal women, with an average of 2.4 complications per woman. In the case of deliveries covered by the Unified Health System, urinary tract infection (38.2%, anemia (26.0% and leucorrhea (23.5% were more frequent. In turn, vaginal bleeding (26.4%, urinary tract infection (23.9% and leucorrhoea (23.7% were prevalent in deliveries that were not covered by the Unified Health System. Puerperal women that had their delivery covered by the Unified Health System reported a greater number of intercurrences related to infectious diseases, while women who used health plans and private sources reported intercurrences related to chronic diseases. A higher frequency of puerperal adolescents, non-white women, and women without partner among those assisted in the Unified Health System (p < 0.001. Conclusion: the high prevalence of complications indicates the need for monitoring and preventing diseases during pregnancy, especially in the case of pregnant women with unfavorable sociodemographic characteristics.

  7. DIstributed VIRtual System (DIVIRS) Project

    Science.gov (United States)

    Schorr, Herbert; Neuman, B. Clifford; Gaines, Stockton R.; Mizell, David

    1996-01-01

    The development of Prospero moved from the University of Washington to ISI and several new versions of the software were released from ISI during the contract period. Changes in the first release from ISI included bug fixes and extensions to support the needs of specific users. Among these changes was a new option to directory queries that allows attributes to be returned for all files in a directory together with the directory listing. This change greatly improves the performance of their server and reduces the number of packets sent across their trans-pacific connection to the rest of the internet. Several new access method were added to the Prospero file method. The Prospero Data Access Protocol was designed, to support secure retrieval of data from systems running Prospero.

  8. Trends in treatment of anterior cruciate ligament injuries of the knee in the public and private healthcare systems of Brazil

    Directory of Open Access Journals (Sweden)

    Diego Costa Astur

    Full Text Available CONTEXT AND OBJECTIVE Orthopedic surgery implies high costs for both public and private healthcare. The aim of this study was to better understand the differences between the public and private sectors regarding treatment of a damaged anterior cruciate ligament, which is a common knee injury. DESIGN AND SETTING Descriptive cross-sectional study conducted during the Brazilian Orthopedics Congress in Brasília. METHODS We applied questionnaires during the 2010 Brazilian Orthopedics Congress, with participation by 241 knee surgeons from 24 Brazilian states. This was followed by statistical analysis on the data that were obtained. RESULTS The orthopedic surgeons who were evaluated used different approaches and treatment options in different Brazilian states, comparing between the public and private systems. CONCLUSION Both in the public and in the private systems in Brazil, because of non-medical issues surrounding the treatment, the best medical decision is not always made. This may be harmful both to patients and to physicians.

  9. Private Schools

    Data.gov (United States)

    Department of Homeland Security — This Private Schools feature dataset is composed of all Private elementary and secondary education features in the United States as defined by the Private School...

  10. Current systems of sterilization in the Philippines in both government and private hospitals

    International Nuclear Information System (INIS)

    Lim, L.E.

    1996-01-01

    In the Philippines, there are 1,700 registered hospitals, both private and government. There are 80,000 beds. The systems of sterilization are mainly using steam or to use ethylene oxide sterilization. Gamma ray sterilization is purely on experimental basis and very limited scale for industrial products. The author will trace the history of sterilization, practised since a century ago and trace back to the present system of sterilization. The principles applied, precautions and limitations or advantages of the different systems will be discussed particularly steam sterilization and ethylene oxide. Other forms of sterilization either chemical or physical will be discussed in passing. Experience in gamma ray sterilization in Japan and Australia will be presented when available data are obtained, to encourage local investors to engage in such venture. Philippines has been left behind by our neighbors. (author)

  11. All-optical virtual private network and ONUs communication in optical OFDM-based PON system.

    Science.gov (United States)

    Zhang, Chongfu; Huang, Jian; Chen, Chen; Qiu, Kun

    2011-11-21

    We propose and demonstrate a novel scheme, which enables all-optical virtual private network (VPN) and all-optical optical network units (ONUs) inter-communications in optical orthogonal frequency-division multiplexing-based passive optical network (OFDM-PON) system using the subcarrier bands allocation for the first time (to our knowledge). We consider the intra-VPN and inter-VPN communications which correspond to two different cases: VPN communication among ONUs in one group and in different groups. The proposed scheme can provide the enhanced security and a more flexible configuration for VPN users compared to the VPN in WDM-PON or TDM-PON systems. The all-optical VPN and inter-ONU communications at 10-Gbit/s with 16 quadrature amplitude modulation (16 QAM) for the proposed optical OFDM-PON system are demonstrated. These results verify that the proposed scheme is feasible. © 2011 Optical Society of America

  12. Importance of Public-Private Partnerships: Strengthening Laboratory Medicine Systems and Clinical Practice in Africa.

    Science.gov (United States)

    Shrivastava, Ritu; Gadde, Renuka; Nkengasong, John N

    2016-04-15

    After the launch of the US President's Emergency Plan for AIDS Relief in 2003, it became evident that inadequate laboratory systems and services would severely limit the scale-up of human immunodeficiency virus infection prevention, care, and treatment programs. Thus, the Office of the US Global AIDS Coordinator, Centers for Disease Control and Prevention, and Becton, Dickinson and Company developed a public-private partnership (PPP). Between October 2007 and July 2012, the PPP combined the competencies of the public and private sectors to boost sustainable laboratory systems and develop workforce skills in 4 African countries. Key accomplishments of the initiative include measurable and scalable outcomes to strengthen national capacities to build technical skills, develop sample referral networks, map disease prevalence, support evidence-based health programming, and drive continuous quality improvement in laboratories. This report details lessons learned from our experience and a series of recommendations on how to achieve successful PPPs. © The Author 2016. Published by Oxford University Press for the Infectious Diseases Society of America. All rights reserved. For permissions, e-mail journals.permissions@oup.com.

  13. When the business of nursing was the nursing business: the private duty registry system, 1900-1940.

    Science.gov (United States)

    Whelan, Jean C

    2012-05-31

    In the initial decades of the 20th century, most nurses worked in the private sector as private duty nurses dependent on their own resources for securing and obtaining employment with individual patients. To organize and systematize the ways in which nurses sought jobs, a structure of private duty registries, agencies which connected nurses with patients, was established via professional nurse associations. This article describes the origins of the private duty nurse labor market as the main employment field for early nurses and ways in which the private duty registry system connected nurses and patients. The impact of professional nurses associations and two registries, (New York and Chicago) illustrates how the business of nursing was carried out, including registry formation, operation, and administration. Private duty nurses are compelling examples of a previous generation of nurse entrepreneurs. The discussion identifies problems and challenges of private nursing practice via registries, including the decline and legacy of this innovative nurse role. The story of early 20th century nurse owned and operated registries provides an early and critical historical illustration of the realization of nurse power, entrepreneurship, and control over professional practice that we still learn from today.

  14. Energy management at public-private partnerships. A reference model for energy efficient building construction projects; Energiemanagement bei Oeffentlich-Privaten Partnerschaften. Ein Referenzmodell fuer energieeffiziente Hochbauprojekte

    Energy Technology Data Exchange (ETDEWEB)

    Heidel, Robin

    2013-04-01

    The enhancement of the energy efficiency reduces the life cycle costs of real estates, and is an important component in achieving global climate goals. In the construction and operation of public building constructions, the state has to assume the function of a role model. Due to the budgetary position of the public authority continuously in deficit, the alternative form of procurement public-private partnerships will become increasingly important. The author of the contribution under consideration reports on the design of building construction projects of public-private partnerships in order to guarantee an energy efficient operation. A reference model with process descriptions for the single phases of the project is developed. The author describes the possible benefit of this model by means of an application example.

  15. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  16. MSFC Propulsion Systems Department Knowledge Management Project

    Science.gov (United States)

    Caraccioli, Paul A.

    2007-01-01

    This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

  17. UHP lamp systems for projection applications

    International Nuclear Information System (INIS)

    Derra, Guenther; Moench, Holger; Fischer, Ernst; Giese, Hermann; Hechtfischer, Ulrich; Heusler, Gero; Koerber, Achim; Niemann, Ulrich; Noertemann, Folke-Charlotte; Pekarski, Pavel; Pollmann-Retsch, Jens; Ritz, Arnd; Weichmann, Ulrich

    2005-01-01

    Projection systems have found widespread use in conference rooms and other professional applications during the last decade and are now entering the home TV market at a considerable pace. Projectors as small as about one litre are able to deliver several thousand screen lumens and are, with a system efficacy of over 10 lm W -1 , the most efficient display systems realized today. Short arc lamps are a key component for projection systems of the highest efficiency for small-size projection displays. The introduction of the ultra high performance (UHP) lamp system by Philips in 1995 can be identified as one of the key enablers of the commercial success of projection systems. The UHP lamp concept features outstanding arc luminance, a well suited spectrum, long life and excellent lumen maintenance. For the first time it combines a very high pressure mercury discharge lamp with extremely short and stable arc gap with a regenerative chemical cycle keeping the discharge walls free from blackening, leading to lifetimes of over 10 000 h. Since the introduction of the UHP lamp system, many important new technology improvements have been realized: burner designs for higher lamp power, advanced ignition systems, miniaturized electronic drivers and innovative reflector concepts. These achievements enabled the impressive increase of projector light output, a remarkable reduction in projector size and even higher optical efficiency in projection systems during the last years. In this paper the concept of the UHP lamp system is described, followed by a discussion of the technological evolution the UHP lamp has undergone so far. Last, but not least, the important improvements of the UHP lamp system including the electronic driver and the reflector are discussed. (review article)

  18. Getting Digital Assets from Public–Private Partnership Research Projects through “The Valley of Death,” and Making Them Sustainable

    Science.gov (United States)

    Aartsen, Wendy; Peeters, Paul; Wagers, Scott; Williams-Jones, Bryn

    2018-01-01

    Projects in public–private partnerships, such as the Innovative Medicines Initiative (IMI), produce data services and platforms (digital assets) to help support the use of medical research data and IT tools. Maintaining these assets beyond the funding period of a project can be a challenge. The reason for that is the need to develop a business model that integrates the perspectives of all different stakeholders involved in the project, and these digital assets might not necessarily be addressing a problem for which there is an addressable market of paying customers. In this manuscript, we review four IMI projects and the digital assets they produced as a means of illustrating the challenges in making digital assets sustainable and the lessons learned. To progress digital assets beyond proof-of-concept into widely adopted tools, there is a need for continuation of multi-stakeholder support tailored to these assets. This would be best done by implementing a structure similar to the accelerators that are in place to help transform startup businesses into growing and thriving businesses. The aim of this article is to highlight the risk of digital asset loss and to provoke discussion on the concept of developing an “accelerator” for digital assets from public–private partnership research projects to increase the chance that digital assets will be sustained and continue to add value long after a project has ended. PMID:29594123

  19. Getting Digital Assets from Public–Private Partnership Research Projects through “The Valley of Death,” and Making Them Sustainable

    Directory of Open Access Journals (Sweden)

    Wendy Aartsen

    2018-03-01

    Full Text Available Projects in public–private partnerships, such as the Innovative Medicines Initiative (IMI, produce data services and platforms (digital assets to help support the use of medical research data and IT tools. Maintaining these assets beyond the funding period of a project can be a challenge. The reason for that is the need to develop a business model that integrates the perspectives of all different stakeholders involved in the project, and these digital assets might not necessarily be addressing a problem for which there is an addressable market of paying customers. In this manuscript, we review four IMI projects and the digital assets they produced as a means of illustrating the challenges in making digital assets sustainable and the lessons learned. To progress digital assets beyond proof-of-concept into widely adopted tools, there is a need for continuation of multi-stakeholder support tailored to these assets. This would be best done by implementing a structure similar to the accelerators that are in place to help transform startup businesses into growing and thriving businesses. The aim of this article is to highlight the risk of digital asset loss and to provoke discussion on the concept of developing an “accelerator” for digital assets from public–private partnership research projects to increase the chance that digital assets will be sustained and continue to add value long after a project has ended.

  20. The Evolution of Privatization at Hanford Tank Waste Treatment Complex

    International Nuclear Information System (INIS)

    BROWN, N.R.

    2001-01-01

    Privatization acquisition strategies embody substantial contract reform principles-private financing and ownership, competition, fixed prices, and payment only upon delivery of services-which in time became the recipe for privatization of Department of Energy (DOE) Environmental Management (EM) cleanup projects. Privatization changes the federal government's approach from traditional cost-plus contracting, where the federal government pays the contractor as the project progresses, to a strategy where the federal government pays for products or services as they are delivered. To be successful, the privatization requires additional risk taking by the contractor. This paper focuses on why the Tank Waste Remediation System (TWRS) pursued privatization, how the TWRS Privatization Project matured, and why the privatization project moved to an alternate path. The paper is organized as follows: a description of the TWRS-Privatization framework, how the project changed from the original request for proposal through the decision not to proceed to Part B-2, and the lessons learned during evolution of the effort, including what worked as well as what went wrong and how such negative outcomes might be prevented in the future

  1. Conflicting logics in Public Private Innovation

    DEFF Research Database (Denmark)

    Nissen, Helle Aarøe

    The article explores the interplay between conflicting logics, when private firms interact with potential public customers, as the firms aim to commercialize welfare innovations developed through Public Private Innovation (PPI) projects. Commercialization of welfare innovations in healthcare may...... be challenging, as a ‘not invented here’ (NIH) logic is perceived as present across hospitals in the Danish healthcare system. Based on a study of 17 PPI projects 5 cases are investigated consisting of 5 PPI projects, where 1 extreme case is illustrated in depth. The findings show that firms experience...

  2. Information Security Management as a Bridge in Cloud Systems from Private to Public Organizations

    Directory of Open Access Journals (Sweden)

    Myeonggil Choi

    2015-08-01

    Full Text Available Cloud computing has made it possible for private companies to make rapid changes in their computing environments. However, in the public sector, security issues hinder institutions from adopting cloud computing. To solve these security challenges, in this paper, we propose a methodology for information security management, which quantitatively classifies the importance of information in cloud systems in the public sector. In this study, we adopt a Delphi approach to establish the classification criteria of the proposed methodology in an objective and systematic manner. Further, through a case study of a public corporation, we try to validate the usefulness of the proposed methodology. The results of this study will help public institutions to consider introducing cloud computing and to manage cloud systems effectively and securely.

  3. The concept of marketing in the public-private partnership in the medical system in Romania.

    Science.gov (United States)

    Purcărea, V L; Coculescu, B I; Coculescu, E C

    2014-01-01

    During the transition period, the Romanian medical system, subject (like other areas) to a process of reform, had to go through a difficult path, not without obstacles (malpractice, underfunding, embezzlement scandals in the media etc.). Consequently, Romania has faced (and unfortunately still is still facing) the massive exodus of health professionals to countries where they can benefit from better working conditions and payment, and those who suffer from health care crisis are the patients. Reform means "the people in the system for the people", which requires a change of mindset within the medical staff, especially in the continuous professional development. However, to talk about the quality of the medical act requires that all those involved in the medical system should create appropriate conditions - i.e. advanced technical equipment and appropriate salaries. In addition, as underfunding is the main cause of failure in the health system, that management remains the only tool that can lead to the appropriate use of the existing resources and the quality of health services. Therefore, the idea of public-private partnership - which occurred as a challenge, especially after the EU accession - can be considered a solution designed to improve the quality and cost of health services. In other words, the cooperation of the private sector with the public authority means increasing the rigor of the medical equipment performance, fostering professional competition, and an increased attention to the patient, in a word: performance. Currently, more and more frequently, the management has studied to identify opportunities for innovation in health care services in an attempt to bring together patients and practitioners in the field by resorting to the identification of the ways they can receive health care services promptly, fairly and efficiently. Therefore, a clear and responsible design in the spirit of ethics and medical ethic will help the marketing manager solve many

  4. Public private partnerships

    NARCIS (Netherlands)

    Miranda Sarmento, J.J.

    2014-01-01

    Public-private partnerships (PPPs) are increasing in number worldwide and are used to build and manage large public infrastructure projects. In PPPs, the private sector plays a role in developing and maintaining public infrastructure and services, which is usually a public sector responsibility.

  5. Private health care expenditure and quality in Beveridge systems: cross-regional differences in the Italian NHS.

    Science.gov (United States)

    Del Vecchio, Mario; Fenech, Lorenzo; Prenestini, Anna

    2015-03-01

    Private health care expenditure ranges from 15% to 30% of total healthcare spending in OECD countries. The literature suggests that there should be an inverse correlation between quality of public services and private expenditures. The main objective of this study is to explore the association between quality of public healthcare and private expenditures in the Italian Regional Healthcare Systems (RHSs). The institutional framework offered by the Italian NHS allows to investigate on the differences among the regions while controlling for institutional factors. The study uses micro-data from the ISTAT Household Consumption Survey (HCS) and a rich set of regional quality indicators. The results indicate that there is a positive and significant correlation between quality and private spending per capita across regions. The study also points out the strong association between the distribution of private consumption and income. In order to account for the influence of income, the study segmented data in three socio-economic classes and computed cross-regional correlations of RHSs quality and household healthcare expenditure per capita, within each class. No correlation was found between the two variables. These findings are quite surprising and call into question the theory that better quality of public services crowds out private spending, or, at the very least, it undermines the simplistic notions that higher levels of private spending are a direct consequence of poor quality in the public sector. This suggests that policies should avoid to simplistically link private spending with judgements or assessments about the functioning or efficacy of the public system and its organizations. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  6. Quantity Surveying Undergraduates’ Awareness on Cost Significant of High-Rise Condominium Projects in Malaysia: The Case of a Private University in Malaysia

    Directory of Open Access Journals (Sweden)

    Peng Lee Wah

    2016-01-01

    Full Text Available Recent developments in quantity surveying (QS emphasised the importance of identifying cost significant elements (CSE. The knowledge on CSE of high-rise condominium projects (HRCP is essential as high-rise residential multi-unit projects are the next option in building construction due to limited land areas in urban areas. This study aims to determine the levels of awareness among QS undergraduates of a private university in Malaysia on CSE of HRCP in Malaysia. The respondents’ knowledge on CSE has not achieved a satisfactory level. Both male and female respondents have the same levels of awareness on CSE. Remedial strategies to improve this situation are recommended.

  7. World energy projection system: Model documentation

    Science.gov (United States)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES), provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report.

  8. World energy projection system: Model documentation

    International Nuclear Information System (INIS)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO) (Figure 1). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES) provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report

  9. The funding of dangerous nuclear projects. Nuclear trade and safety: the role of French private banks. What are we talking about?

    International Nuclear Information System (INIS)

    Philippe, Isabelle

    2011-01-01

    Countries which export nuclear technologies, notably France, have developed mechanisms of financial support to incite private banks to finance the sale of reactors to foreign countries, notably EPRs in the case of France. After having briefly introduced this issue, and dealing with the French case, this publication indicates the concerned banks, and outlines that some of them finance nuclear projects which have been assessed by NGOs as dangerous in terms of nuclear safety. It notably presents the Angra 3 project in Brazil: its cost, its planning, its main safety problems (obsolete technology, building authorization awarded without any actual safety analysis, situation of conflict of interest for the Brazilian regulator). It also presents the Jaitapur project in India in which Areva is as well involved: costs, funding, planning, main risks (seismic risk area, safety level much lower than the one required in France, controversy on the impact study). The document finally explains why banks must not fund nuclear projects

  10. Beneficiaries of conflict: a qualitative study of people’s trust in the private health care system in Mogadishu, Somalia

    Directory of Open Access Journals (Sweden)

    Gele AA

    2017-08-01

    Full Text Available Abdi A Gele,1–3 Mohamed Yusuf Ahmed,4 Prabhjot Kour,2 Sadiyo Ali Moallim,5 Abdulwahab Moallim Salad,3 Bernadette Kumar2 1Institute of Nursing and Health Promotion, Department of Health, Oslo and Akershus University College of Applied Science, 2Department for Research, Norwegian Centre for Minority Health Research, Oslo, Norway; 3Center for Health Research, Somali National University, 4Department of Business Management, Simad University, 5Faculty of Medicine, Benadir University, Mogadishu, Somalia Background: In 2005, the World Health Conference called for all nations to move toward universal health coverage, which is defined as “access to adequate health care for all at an affordable price”. Despite this, an estimated 90% of Somalia’s largely impoverished population use private health care. Therefore, considering that the private health care system is the dominant health care system in Mogadishu, Somalia, exploring the accessibility to, as well as people’s trust in, the private sector is essential to help contribute an equitable and affordable health care system in the country.Methods: A qualitative study using unstructured interviews was conducted in Mogadishu from August to November of 2016. A purposive sampling approach was used to recruit 23 participants, including seven medical doctors who own private health centers, eight patients, five medical students and three senior officials who work for the Ministry of Health. Data were analyzed using a thematic analysis.Results: Our findings show that the private health care system in Mogadishu is not only unregulated but also expensive, with the cost of health care often unaffordable for the majority of the country’s citizens. There is evidence of prescription of inappropriate treatment, tendency to conduct unnecessary laboratory tests, excessive use of higher diagnostic technologies and overcharging – including the widespread practice of further appointments for follow-up – which

  11. Successful Models of Implementation of e-HRM Systems in the Private Sector in Romania

    Directory of Open Access Journals (Sweden)

    Aurel TOTOLICI

    2013-12-01

    Full Text Available The essential condition for attaining excellence in the informatized administration of the Human Resources Management (HRM activities is the development and implementation of high-performance e-HRM systems. For this reason, any organization, regardless of her nature and dimensions, needs to make use of the implementation of an e-HRM IT system adapted to its specific needs, because the performances of the HR activities largely depend on the correlation of the software tools with the employees’ abilities. The identification of the benefits of the e-HRM systems and the impact of these systems on the managerial and, implicitly, organizational performances have become highly interesting subjects, both among the theorists and among the practitioners worldwide. In order to detail the effects and the benefits of the implementation of the e-HRM system, we considered it useful to present a case study focused on a private firm of Romania: Arcelor Mittal Company of Galaţi, namely a Steel Mill.

  12. Business System Planning Project, Alternatives Analysis

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files

  13. Designing and Conducting Health Systems Research Projects ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · Resources · Publications. Designing and Conducting Health Systems Research Projects Volume 1: Proposal Development and Fieldwork ... IDRC and the United Kingdom's Global AMR Innovation Fund—managed by the ... New website will help record vital life events to improve access to services for all.

  14. 76 FR 12354 - Cumberland System of Projects

    Science.gov (United States)

    2011-03-07

    ... Third Scenario--Return to Original Marketing Policy Inside TVA Preference Customers Capacity and Base.... Discussion: The marketing policy for the Cumberland System of Projects provides peaking capacity, along with 1500 hours of energy annually with each kilowatt of capacity, to customers outside the Tennessee Valley...

  15. Competitive strategy for the proposed Texas high speed rail project : a system dynamics/ CLIOS process approach.

    Science.gov (United States)

    2017-09-10

    The Texas High-Speed Rail (HSR) is an unprecedented US project proposed by a private company. This project has many uncertainties because it will be funded only by the private sectors and it is the first US HSR project using foreign technology. The H...

  16. Digital detection systems for projection radiography

    International Nuclear Information System (INIS)

    Schulz, R.F.

    2001-01-01

    This article gives a survey of digital X-ray detection systems for projection radiography. The different principles are compared and some general characteristics are derived. The basic conversion mechanisms in the absorption layers are described. The basic principles of solid state X-ray detectors and their general characteristics are elucidated as well as some similarities with detectors for computed tomography. Some important application and system aspects are considered. An outlook on further possible developments in this field is given. (orig.) [de

  17. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  18. Tank waste remediation system characterization project quality policies. Revision 1

    International Nuclear Information System (INIS)

    Trimble, D.J.

    1995-01-01

    These Quality Policies (QPs) describe the Quality Management System of the Tank Waste Characterization Project (hereafter referred to as the Characterization Project), Tank Waste Remediation System (TWRS), Westinghouse Hanford Company (WHC). The Quality Policies and quality requirements described herein are binding on all Characterization Project organizations. To achieve quality, the Characterization Project management team shall implement this Characterization Project Quality Management System

  19. The Generalizability of Private Sector Research on Software Project Management in Two USAF Organizations: An Exploratory Study

    National Research Council Canada - National Science Library

    Garman, Michael

    2003-01-01

    ... budget. However, software projects frequently fail to meet these criteria. Software engineers, acquisition officers, and project managers have all studied this issue and made recommendations for achieving success...

  20. World Energy Projection System model documentation

    International Nuclear Information System (INIS)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA

  1. World Energy Projection System model documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

  2. The NASA Advanced Space Power Systems Project

    Science.gov (United States)

    Mercer, Carolyn R.; Hoberecht, Mark A.; Bennett, William R.; Lvovich, Vadim F.; Bugga, Ratnakumar

    2015-01-01

    The goal of the NASA Advanced Space Power Systems Project is to develop advanced, game changing technologies that will provide future NASA space exploration missions with safe, reliable, light weight and compact power generation and energy storage systems. The development effort is focused on maturing the technologies from a technology readiness level of approximately 23 to approximately 56 as defined in the NASA Procedural Requirement 7123.1B. Currently, the project is working on two critical technology areas: High specific energy batteries, and regenerative fuel cell systems with passive fluid management. Examples of target applications for these technologies are: extending the duration of extravehicular activities (EVA) with high specific energy and energy density batteries; providing reliable, long-life power for rovers with passive fuel cell and regenerative fuel cell systems that enable reduced system complexity. Recent results from the high energy battery and regenerative fuel cell technology development efforts will be presented. The technical approach, the key performance parameters and the technical results achieved to date in each of these new elements will be included. The Advanced Space Power Systems Project is part of the Game Changing Development Program under NASAs Space Technology Mission Directorate.

  3. Measurement and analysis of electromagnetic fields of pulsed magnetic field therapy systems for private use

    International Nuclear Information System (INIS)

    Jaermann, Thomas; Suter, Fabian; Osterwalder, Diego; Luechinger, Roger

    2011-01-01

    Recently, pulsed magnetic field therapy (PMFT) systems have become available for private use. Although they may be applied without medical supervision, only a little is known about their field quantities. In this study, the spatial distribution and the temporal characteristics of the magnetic flux densities of three PMFT systems, available in Europe, were analysed. In close proximity to the surface, the maxima of the peak magnetic flux densities were 461 μT, 170 μT and 133 μT, respectively. At a distance of 30 cm above the whole body mat, the peak magnetic flux density was 77 μT. The excitation patterns consisted of repeating bursts with carrier frequencies between 210 and 1667 Hz. In conclusion, magnetic flux densities were far above International Commission on Non-Ionizing Radiation Protection reference levels. Since these systems are supposed to be medical devices as well as wellness devices, risk analysis of PMFT systems and the effectiveness of these devices need to be investigated in future studies.

  4. Privacy as Invisibility: Pervasive Surveillance and the Privatization of Peer-to-Peer Systems

    Directory of Open Access Journals (Sweden)

    Francesca Musiani

    2011-06-01

    Full Text Available This article addresses the ongoing, increasing privatization of peer-to-peer (P2P file sharing systems – the emergence of systems that users may only join by personal, friend-to-friend invitation. It argues that, within P2P systems, privacy is increasingly coinciding with “mere” invisibility vis-à-vis the rest of the Internet ecosystem because of a trend that has shaped the recent history of P2P technology: The alternation between forms of pervasive surveillance of such systems, and reactions by developers and users to such restrictive measures. Yet, it also suggests that the richness of today’s landscape of P2P technology development and use, mainly in the field of Internet-based services, opens up new dimensions to the conceptualization of privacy, and may give room to a more articulate definition of the concept as related to P2P technology; one that includes not only the need of protection from external attacks, and the temporary outcomes of the competition between surveillance and counter-surveillance measures, but also issues such as user empowerment through better control over personal information, reconfiguration of data management practices, and removal of intermediaries in sharing and communication activities.

  5. A comparative institutional evaluation of public-private partnerships in Dutch urban land-use and revitalisation projects

    NARCIS (Netherlands)

    Nijkamp, P.; van der Burch, M.; Vindigni, G.

    2002-01-01

    In the spirit of the devolution of public policy, we have recently witnessed an increasing popularity of decentralised forms of decision-making in urban land-use policy, in which both local (or regional) authorities and the private sector play a more prominent joint role in the preparation and

  6. Integrating System Dynamic and Fuzzy Logic for Economic Assessment of BOT Projects

    Directory of Open Access Journals (Sweden)

    Farnad Nasirzadeh

    2016-03-01

    Full Text Available The selection of the most appropriate project for the investment is one of the most important decisions that should be made by the private investors. This problem is of vital importance in BOT projects, where the total investment as well as the investor's profit should be recovered by the project's income. There are several approaches proposed by the researchers to determine the best economical project in comparison to other projects. The previous researches, however, faced with some major defects. As an example, the effects of various factors affecting the project evaluation process as well as the existing risks and uncertainties are not taken into account. In this research, economic assessment of BOT projects is performed by integrating system dynamic simulation approach and fuzzy logic. For this purpose, first the project's NPV is modeled considering all the influencing factors qualitatively. The relationships that exist between different factors are then determined and the quantitative model is built. Using the developed model, the value of NPV is simulated considering the effects of all the influencing factors and the existing uncertainties. Finally, the value of project's NPV is determined as a triangular fuzzy number. Finally, the best alternative project is selected by comparing the simulated values of NPV. To evaluate the capabilities and performance of the proposed model, the project economical evaluation is performed for two highway projects and the best project is selected.

  7. Generalized projective synchronization between Lorenz system and Chen's system

    International Nuclear Information System (INIS)

    Li Guohui

    2007-01-01

    On the basis of active backstepping design, this paper presents the generalized projective synchronization between two different chaotic systems: Lorenz system and Chen's system. The proposed method combines backstepping methods and active control without having to calculate the Lyapunov exponents and the eigenvalues of the Jacobian matrix, which makes it simple and convenient. Numerical simulations show that this method works very well

  8. Public and private sector in the health care system of the Federation bosnia and herzegovina: policy and strategy.

    Science.gov (United States)

    Slipicevic, Osman; Malicbegovic, Adisa

    2012-01-01

    In Bosnia and Herzegovina citizens receive health care from both public and private providers. The current situation calls for a clear government policy and strategy to ensure better position and services from both parts. This article examines how health care services are delivered, particularly with respect to relationship between public and private providers. The paper notes that the public sector is plagued by a number of weaknesses in terms of inefficiency of services provision, poorly motivated staff, prevalent dual practice of public employees, poor working conditions and geographical imbalances. Private sector is not developing in ways that address the weaknesses of the public sector. Poorly regulated, it operates as an isolated entity, strongly profit-driven. The increasing burdens on public health care system calls for government to abandon its passive role and take action to direct growth and use potential of private sector. The paper proposes a number of mechanisms that can be used to influence private as well as public sector, since actions directed toward one part of the system will inevitable influence the other.

  9. Beneficiaries of conflict: a qualitative study of people’s trust in the private health care system in Mogadishu, Somalia

    Science.gov (United States)

    Gele, Abdi A; Ahmed, Mohamed Yusuf; Kour, Prabhjot; Moallim, Sadiyo Ali; Salad, Abdulwahab Moallim; Kumar, Bernadette

    2017-01-01

    Background In 2005, the World Health Conference called for all nations to move toward universal health coverage, which is defined as “access to adequate health care for all at an affordable price”. Despite this, an estimated 90% of Somalia’s largely impoverished population use private health care. Therefore, considering that the private health care system is the dominant health care system in Mogadishu, Somalia, exploring the accessibility to, as well as people’s trust in, the private sector is essential to help contribute an equitable and affordable health care system in the country. Methods A qualitative study using unstructured interviews was conducted in Mogadishu from August to November of 2016. A purposive sampling approach was used to recruit 23 participants, including seven medical doctors who own private health centers, eight patients, five medical students and three senior officials who work for the Ministry of Health. Data were analyzed using a thematic analysis. Results Our findings show that the private health care system in Mogadishu is not only unregulated but also expensive, with the cost of health care often unaffordable for the majority of the country’s citizens. There is evidence of prescription of inappropriate treatment, tendency to conduct unnecessary laboratory tests, excessive use of higher diagnostic technologies and overcharging – including the widespread practice of further appointments for follow-up – which inflates the costs. The study also found poor patient–provider relationship and widespread distrust of the private health care system. Conclusion The study findings underline the need for the Somali government to develop regulatory mechanisms and guidelines with the potential to guide the private health care sector to provide equitable and affordable health care to people in Mogadishu. The doctor–patient relationship has been – and remains – a keystone of care; thus, there is an urgent need for guidelines for

  10. Beneficiaries of conflict: a qualitative study of people's trust in the private health care system in Mogadishu, Somalia.

    Science.gov (United States)

    Gele, Abdi A; Ahmed, Mohamed Yusuf; Kour, Prabhjot; Moallim, Sadiyo Ali; Salad, Abdulwahab Moallim; Kumar, Bernadette

    2017-01-01

    In 2005, the World Health Conference called for all nations to move toward universal health coverage, which is defined as "access to adequate health care for all at an affordable price". Despite this, an estimated 90% of Somalia's largely impoverished population use private health care. Therefore, considering that the private health care system is the dominant health care system in Mogadishu, Somalia, exploring the accessibility to, as well as people's trust in, the private sector is essential to help contribute an equitable and affordable health care system in the country. A qualitative study using unstructured interviews was conducted in Mogadishu from August to November of 2016. A purposive sampling approach was used to recruit 23 participants, including seven medical doctors who own private health centers, eight patients, five medical students and three senior officials who work for the Ministry of Health. Data were analyzed using a thematic analysis. Our findings show that the private health care system in Mogadishu is not only unregulated but also expensive, with the cost of health care often unaffordable for the majority of the country's citizens. There is evidence of prescription of inappropriate treatment, tendency to conduct unnecessary laboratory tests, excessive use of higher diagnostic technologies and overcharging - including the widespread practice of further appointments for follow-up - which inflates the costs. The study also found poor patient-provider relationship and widespread distrust of the private health care system. The study findings underline the need for the Somali government to develop regulatory mechanisms and guidelines with the potential to guide the private health care sector to provide equitable and affordable health care to people in Mogadishu. The doctor-patient relationship has been - and remains - a keystone of care; thus, there is an urgent need for guidelines for private health care providers to treat their patients with

  11. Project-based production and project management : Findings and trends in research on temporary systems in multiple contexts

    NARCIS (Netherlands)

    Pretorius, M.W.; Oerlemans, L.A.G.

    2014-01-01

    Globalisation is challenging almost every aspect of the political, economic, social and technological environment. Organisations, whether public or private, have to adapt their strategies and operations to stay competitive and efficient. Historically, organisations adopted project-based operations

  12. Strategic urban projects in Amsterdam and New York : Incomplete contracts and good faith in different legal systems

    NARCIS (Netherlands)

    Van der Veen, M.; Korthals Altes, W.K.

    2009-01-01

    Contracts between local government and private investment agencies play an important role in strategic urban projects. Real estate cycles provide only a narrow window of opportunity within which to draft such contracts. A legal system should therefore not impede the possibility of reaching an

  13. Privatization in economic theory

    Directory of Open Access Journals (Sweden)

    Drakić Maja

    2007-01-01

    Full Text Available In reality privatization has never occurred according to the handbook rules of ordinary market transactions. Not even in advanced market economies can privatization transactions be described by the Walrasian or Arrowian, or Leontiefian equilibrium models, or by the equilibrium models of the game theory. In these economies transactions of privatization take place in a fairly organic way – which means that those are driven by the dominance of private property rights and in a market economy. But despite this fact Western privatization also some peculiar features as compared to ordinary company takeovers, since the state as the seller may pursue non – economic goals. Changes in the dominant form of property change positions and status of many individuals and groups in the society. That’s why privatization can even less be explained by ordinary market mechanisms in transition countries where privatizing state-owned property have happened in a mass scale and where markets and private property rights weren't established at the time process of privatization began. In this paper I’ll discuss and analyze the phenomenon of privatization in context of different economic theories arguing that empirical results go in favor of the public choice theory (Buchanan, 1978, theory of "economic constitution" (Brennan and Buchanan 1985, (Buchanan and Tullock, 1989, and theory of "collective action" (Olson, 1982. These theories argues that transition from one economic system into another, for example transition from collectivistic, socialistic system into capitalism and free market economy with dominant private property, will not happen through isolated changes of only few economic institutions, no matter how deep that changes would be. In other words privatization can not give results if it's not followed by comprehensive change of economic system because privatized companied wouldn't be able to operate in old environment.

  14. PPP projects in transport

    DEFF Research Database (Denmark)

    Petersen, Ole Helby; Carpintero, Samuel

    2014-01-01

    Public–private partnerships (PPPs) have been extensively used in Spain for the procurement of light rail systems. This paper analyses five projects that have been in operation for more than five years. The authors examine the reasoning behind the selection of the PPP projects, risk......-sharing mechanisms, competition among private providers, and overall cost-effectiveness. The paper demonstrates a need for more rigorous assessments of the merits of PPP projects before they are initiated....

  15. The UK Earth System Model project

    Science.gov (United States)

    Tang, Yongming

    2016-04-01

    In this talk we will describe the development and current status of the UK Earth System Model (UKESM). This project is a NERC/Met Office collaboration and has two objectives; to develop and apply a world-leading Earth System Model, and to grow a community of UK Earth System Model scientists. We are building numerical models that include all the key components of the global climate system, and contain the important process interactions between global biogeochemistry, atmospheric chemistry and the physical climate system. UKESM will be used to make key CMIP6 simulations as well as long-time (e.g. millennium) simulations, large ensemble experiments and investigating a range of future carbon emission scenarios.

  16. The GEM Detector projective alignment simulation system

    International Nuclear Information System (INIS)

    Wuest, C.R.; Belser, F.C.; Holdener, F.R.; Roeben, M.D.; Paradiso, J.A.; Mitselmakher, G.; Ostapchuk, A.; Pier-Amory, J.

    1993-01-01

    Precision position knowledge (< 25 microns RMS) of the GEM Detector muon system at the Superconducting Super Collider Laboratory (SSCL) is an important physics requirement necessary to minimize sagitta error in detecting and tracking high energy muons that are deflected by the magnetic field within the GEM Detector. To validate the concept of the sagitta correction function determined by projective alignment of the muon detectors (Cathode Strip Chambers or CSCs), the basis of the proposed GEM alignment scheme, a facility, called the ''Alignment Test Stand'' (ATS), is being constructed. This system simulates the environment that the CSCs and chamber alignment systems are expected to experience in the GEM Detector, albeit without the 0.8 T magnetic field and radiation environment. The ATS experimental program will allow systematic study and characterization of the projective alignment approach, as well as general mechanical engineering of muon chamber mounting concepts, positioning systems and study of the mechanical behavior of the proposed 6 layer CSCs. The ATS will consist of a stable local coordinate system in which mock-ups of muon chambers (i.e., non-working mechanical analogs, representing the three superlayers of a selected barrel and endcap alignment tower) are implemented, together with a sufficient number of alignment monitors to overdetermine the sagitta correction function, providing a self-consistency check. This paper describes the approach to be used for the alignment of the GEM muon system, the design of the ATS, and the experiments to be conducted using the ATS

  17. Cross border Classical Swine Fever control: Improving Dutch and German crisis management systems by an integrated public-private approach

    NARCIS (Netherlands)

    Breuer, O.; Saatkamp, H.W.; Schütz, V.; Brinkmann, D.; Petersen, B.

    2008-01-01

    The objective of this research approach is to analyse in which ways crisis management measures against Classical Swine Fever (CSF) can be improved by a public private cross border model. A core activity contains the analysis of information and communication systems: In a case study it has been

  18. Comparing Public and Private Institutions That Have and Have Not Implemented Enterprise Resource Planning (ERP) Systems: A Resource Dependence Perspective

    Science.gov (United States)

    Sendhil, Geetha R.

    2012-01-01

    The purpose of this national study was to utilize quantitative methods to examine institutional characteristics, financial resource variables, personnel variables, and customer variables of public and private institutions that have and have not implemented enterprise resource planning (ERP) systems, from a resource dependence perspective.…

  19. Risk allocation in a public-private catastrophe insurance system : an actuarial analysis of deductibles, stop-loss, and premiums

    NARCIS (Netherlands)

    Paudel, Y.; Botzen, W. J. W.; Aerts, J. C. J. H.; Dijkstra, T. K.

    A public-private (PP) partnership could be a viable arrangement for providing insurance coverage for catastrophe events, such as floods and earthquakes. The objective of this paper is to obtain insights into efficient and practical allocations of risk in a PP insurance system. In particular, this

  20. Risk allocation in a public-private catastrophe insurance system : An actuarial analysis of deductibles, stop-loss, and premiums

    NARCIS (Netherlands)

    Paudel, Y.; Botzen, W.J.W.; Dijkstra, Th.; Aerts, J.C.J.H.

    2015-01-01

    A public-private (PP) partnership could be a viable arrangement for providing insurance coverage for catastrophe events, such as floods and earthquakes. The objective of this paper is to obtain insights into efficient and practical allocations of risk in a PP insurance system. In particular, this

  1. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  2. Financial Private Regulation and Enforcement

    OpenAIRE

    MILLER, Geoffrey

    2011-01-01

    This paper has been delivered within the context of the research project "Transnational Private Regulatory Regimes: Constitutional foundations and governance design". This paper considers the topic of private regulation and enforcement for internationally active financial services firms. The paper documents the following types of regulation and enforcement that involve significant private input: house rules, contracts, internal compliance, management-based regulation, private standard-sett...

  3. A systems approach to the management of a contaminated metal recycle project

    International Nuclear Information System (INIS)

    Pincock, L.; Wahnachaffe, S.

    1994-01-01

    Westinghouse Idaho Nuclear Company (WINCO) is working with private industry to recycle contaminated metal from the dismantling and decommissioning of Department of Energy sites and commercial reactors. The recycled metal could be used in many applications such as fabrication of canisters and waste boxes for the storage of spent nuclear fuel and radioactive waste. Management of technical projects similar to this is difficult because these projects consist of a myriad of complex and interrelated issues ranging from technical feasibility to stakeholder acceptance. Systems Analysis provides a way to deal with many complex issues and supports effective decision making

  4. Project-based production and project management: Findings and trends in research on temporary systems in multiple contexts

    Directory of Open Access Journals (Sweden)

    Tinus Pretorius

    2014-02-01

    Full Text Available Globalisation is challenging almost every aspect of the political, economic, social and technological environment. Organisations, whether public or private, have to adapt their strategies and operations to stay competitive and efficient. Historically, organisations adopted project-based operations as a mode to stay competitive, although the applications tended to be the oneoff type of operations such as construction and system development projects (Edum-Fotwe & McCaffer, 2000. As the world changed from an industrially driven to a more knowledge driven economy and the pace of continuous change became more intense, organisations adopted a project-based mode of operations on a broader scale. The knowledge economy lead to the creation of many service orientated industries. Organisations started facing portfolios of projects where the nature of these projects differed in technological complexity, urgency, customer value and social impact (Gutjahr & Froeschl, 2013. Based on their experience with more technically orientated projects, organisations focused their attention more intensely on new project management methods, tools and processes and not necessarily on the human and organisational interfaces. This paradigm changed however, especially since the 1980s and more and more organisations adopted temporary organisational forms (Bakker, 2010 in order to improve their competitiveness. The contributions in this special edition of the South African Journal of Economic and Management Sciences have a common focus on the importance of the human and organisational interface of project-based operations on project success. The purpose of this concluding article is to analyse the findings and recommendations in these papers and to detect trends and future research opportunities in the field of project-based operations.

  5. A bar coding system for environmental projects

    International Nuclear Information System (INIS)

    Barber, R.B.; Hunt, B.J.; Burgess, G.M.

    1988-01-01

    This paper presents BeCode systems, a bar coding system which provides both nuclear and commercial clients with a data capture and custody management program that is accurate, timely, and beneficial to all levels of project operations. Using bar code identifiers is an essentially paperless and error-free method which provides more efficient delivery of data through its menu card-driven structure, which speeds collection of essential data for uploading to a compatible device. The effects of this sequence include real-time information for operator analysis, management review, audits, planning, scheduling, and cost control

  6. Project Management Accountability System (PMAS) - Project Information and Data

    Data.gov (United States)

    Department of Veterans Affairs — The PMAS Dashboard provides a wide range of helpful data and information to assist you in project management and assessment. The drop down menu can be used to search...

  7. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  8. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Богдан Владимирович ГАЙДАБРУС

    2015-05-01

    Full Text Available Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  9. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    OpenAIRE

    Богдан Владимирович ГАЙДАБРУС; Евгений Анатольевич ДРУЖИНИН

    2015-01-01

    Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  10. Private sector approaches to workforce enhancement.

    Science.gov (United States)

    Wendling, Wayne R

    2010-06-01

    This paper addresses the private practice model of dental care delivery in the US. The great majority of dental care services are delivered through this model and thus changes in the model represent a means to substantially change the supply and availability of dental services. The two main forces that change how private practices function are broad economic factors, which alter the demand for dental care and innovations in practice structure and function which alter the supply and cost of services. Economics has long recognized that although there are private market solutions for many issues, not all problems can be addressed through this model. The private practice of dentistry is a private market solution that works for a substantial share of the market. However, the private market may not work to resolve all issues associated with access and utilization. Solutions for some problems call for creative private - public arrangements - another form of innovation; and market-based solutions may not be feasible for each and every problem. This paper discusses these economic factors and innovation as they relate to the private practice of dentistry, with special emphasis on those elements that have increased the capacity of the dental practice to offer services to those with limited means to access fee-based care. Innovations are frequently described as new care delivery models or new workforce models. However, innovation can occur on an ongoing and regular basis as dental practices examine new ways to combine capital and human resources and to leverage the education and skill of the dentists to a greater number of patients. Innovation occurs within a market context as the current and projected economic returns reward the innovation. Innovation can also occur through private-public arrangements. There are indications of available capacity within the existing delivery system to expand service delivery. The Michigan Medicaid Healthy Kids Dental program is discussed as

  11. PPP医疗项目关键成功因素分析%Analysis on the critical success factors in Public-Private Partnership (PPP) health projects in China

    Institute of Scientific and Technical Information of China (English)

    陈龙; 冯蕾

    2017-01-01

    Recently, Public-private Partnerships (PPPs) are being increasingly used in the public facilities and services provision in China.The procurement system ranges from simple contracting of services to the involvement of the private sector in the infrastructure financing, design, construction, operation and maintenance.However, organizing a PPP is not an easy task due to its complexity and long term contractual obligations and this some projects to fail to attract the private sector in the partnership and in the services provision.18 critical success factors of PPP project in the Chinese health sector were undermined by the investigation of this research.The mostly identified CSFs are thorough and realistic benefit assessment, sound policies, appropriate risk allocation and risk mitigation, and the public/private sector responsibilities.This paper finally puts forward the recommendations based on the statistics that are published from the Integrated Information Platform of CPPPC in order to focus on validating them for successful PPP projects achievement.%随着政府与社会资本合作模式(PPP)在中国的推广运用,越来越多的社会资本参与到公共设施的融资、设计、建造和运营中来.然而,由于PPP本身的复杂性和合同义务的长期性,PPP项目要实现落地并不容易.目前,部分PPP医疗项目在吸引社会资本进入和提供服务上遇到困难.本文通过文献综述和专家咨询获得中国医疗领域PPP的18个关键成功因素(CSF),包括收益分配合理、政府政策稳定、风险分担合理、职责划分明确等,并通过近期财政部PPP中心综合信息平台项目库的公开资料来验证中国PPP关键成功因素体系,为促进PPP成功达成协议提供参考.

  12. Entrepreneurial Crowdfunding without Private Claims

    DEFF Research Database (Denmark)

    Boudreau, Kevin J.; Jeppesen, Lars Bo; Reichstein, Toke

    Today's crowdfunding raises funds for tiny, private entrepreneurial ventures without granting funders private claims to a project's future value. Rather than “investments,” these are “contributions.” This paper argues that for such crowdfunding neither producer nor consumer surplus – i.e., project...

  13. Comparative performance of private and public healthcare systems in low- and middle-income countries: a systematic review.

    Directory of Open Access Journals (Sweden)

    Sanjay Basu

    Full Text Available INTRODUCTION: Private sector healthcare delivery in low- and middle-income countries is sometimes argued to be more efficient, accountable, and sustainable than public sector delivery. Conversely, the public sector is often regarded as providing more equitable and evidence-based care. We performed a systematic review of research studies investigating the performance of private and public sector delivery in low- and middle-income countries. METHODS AND FINDINGS: Peer-reviewed studies including case studies, meta-analyses, reviews, and case-control analyses, as well as reports published by non-governmental organizations and international agencies, were systematically collected through large database searches, filtered through methodological inclusion criteria, and organized into six World Health Organization health system themes: accessibility and responsiveness; quality; outcomes; accountability, transparency, and regulation; fairness and equity; and efficiency. Of 1,178 potentially relevant unique citations, data were obtained from 102 articles describing studies conducted in low- and middle-income countries. Comparative cohort and cross-sectional studies suggested that providers in the private sector more frequently violated medical standards of practice and had poorer patient outcomes, but had greater reported timeliness and hospitality to patients. Reported efficiency tended to be lower in the private than in the public sector, resulting in part from perverse incentives for unnecessary testing and treatment. Public sector services experienced more limited availability of equipment, medications, and trained healthcare workers. When the definition of "private sector" included unlicensed and uncertified providers such as drug shop owners, most patients appeared to access care in the private sector; however, when unlicensed healthcare providers were excluded from the analysis, the majority of people accessed public sector care. "Competitive

  14. Comparative Performance of Private and Public Healthcare Systems in Low- and Middle-Income Countries: A Systematic Review

    Science.gov (United States)

    Basu, Sanjay; Andrews, Jason; Kishore, Sandeep; Panjabi, Rajesh; Stuckler, David

    2012-01-01

    Introduction Private sector healthcare delivery in low- and middle-income countries is sometimes argued to be more efficient, accountable, and sustainable than public sector delivery. Conversely, the public sector is often regarded as providing more equitable and evidence-based care. We performed a systematic review of research studies investigating the performance of private and public sector delivery in low- and middle-income countries. Methods and Findings Peer-reviewed studies including case studies, meta-analyses, reviews, and case-control analyses, as well as reports published by non-governmental organizations and international agencies, were systematically collected through large database searches, filtered through methodological inclusion criteria, and organized into six World Health Organization health system themes: accessibility and responsiveness; quality; outcomes; accountability, transparency, and regulation; fairness and equity; and efficiency. Of 1,178 potentially relevant unique citations, data were obtained from 102 articles describing studies conducted in low- and middle-income countries. Comparative cohort and cross-sectional studies suggested that providers in the private sector more frequently violated medical standards of practice and had poorer patient outcomes, but had greater reported timeliness and hospitality to patients. Reported efficiency tended to be lower in the private than in the public sector, resulting in part from perverse incentives for unnecessary testing and treatment. Public sector services experienced more limited availability of equipment, medications, and trained healthcare workers. When the definition of “private sector” included unlicensed and uncertified providers such as drug shop owners, most patients appeared to access care in the private sector; however, when unlicensed healthcare providers were excluded from the analysis, the majority of people accessed public sector care. “Competitive dynamics” for

  15. Comparative performance of private and public healthcare systems in low- and middle-income countries: a systematic review.

    Science.gov (United States)

    Basu, Sanjay; Andrews, Jason; Kishore, Sandeep; Panjabi, Rajesh; Stuckler, David

    2012-01-01

    Private sector healthcare delivery in low- and middle-income countries is sometimes argued to be more efficient, accountable, and sustainable than public sector delivery. Conversely, the public sector is often regarded as providing more equitable and evidence-based care. We performed a systematic review of research studies investigating the performance of private and public sector delivery in low- and middle-income countries. Peer-reviewed studies including case studies, meta-analyses, reviews, and case-control analyses, as well as reports published by non-governmental organizations and international agencies, were systematically collected through large database searches, filtered through methodological inclusion criteria, and organized into six World Health Organization health system themes: accessibility and responsiveness; quality; outcomes; accountability, transparency, and regulation; fairness and equity; and efficiency. Of 1,178 potentially relevant unique citations, data were obtained from 102 articles describing studies conducted in low- and middle-income countries. Comparative cohort and cross-sectional studies suggested that providers in the private sector more frequently violated medical standards of practice and had poorer patient outcomes, but had greater reported timeliness and hospitality to patients. Reported efficiency tended to be lower in the private than in the public sector, resulting in part from perverse incentives for unnecessary testing and treatment. Public sector services experienced more limited availability of equipment, medications, and trained healthcare workers. When the definition of "private sector" included unlicensed and uncertified providers such as drug shop owners, most patients appeared to access care in the private sector; however, when unlicensed healthcare providers were excluded from the analysis, the majority of people accessed public sector care. "Competitive dynamics" for funding appeared between the two sectors, such

  16. IT Project Management from a Systems Thinking Perspective

    NARCIS (Netherlands)

    van Eck, Pascal; Ponisio, Laura

    2008-01-01

    Purpose: We proposes a Systems Thinking approach to the study of IT project management and show how this approach helps project managers in controlling their projects. Systems Thinking is a holistic problem solving method in which system behaviour emerges from the interaction of system components.

  17. Consonance in Information System Projects: A Relationship Marketing Perspective

    Science.gov (United States)

    Lin, Pei-Ying

    2010-01-01

    Different stakeholders in the information system project usually have different perceptions and expectations of the projects. There is seldom consistency in the stakeholders' evaluations of the project outcome. Thus the outcomes of information system projects are usually disappointing to one or more stakeholders. Consonance is a process that can…

  18. Private Labels

    OpenAIRE

    Kolmačková, Zuzana

    2013-01-01

    This Bachelor Thesis titled Private labels deals with distribution strategy based on the introduction of private labels especially in retail chains. At the beginning it is focused on the general concept of private label offered by retailers, where is mentioned basic characteristics, history and structuring of distribution brands. Subsequently this thesis informs readers about the introduction of new special distribution brands, which focus primarily on the new consumption habits of customers....

  19. Privat boligudlejning

    DEFF Research Database (Denmark)

    Andersen, Hans Skifter

    2008-01-01

    for private udlejningsboligers pris, økonomi og kvalitet. Det økonomiske afkast af investering i private udlejningsejendomme har været højt i de sidste 10 år, men fortrinsvist pga. værdistigninger. For tiden er disse gået i stå, hvilket gør den økonomiske fremtid for den private udlejningssektor mindre...

  20. Biometric Systems Private by Design: Reasoning about privacy properties of biometric system architectures

    OpenAIRE

    Bringer, Julien; Chabanne, Herve; Metayer, Daniel Le; Lescuyer, Roch

    2017-01-01

    This work aims to show the applicability, and how, of privacy by design approach to biometric systems and the benefit of using formal methods to this end. Starting from a general framework that has been introduced at STM in 2014, that enables to define privacy architectures and to formally reason about their properties, we explain how it can be adapted to biometrics. The choice of particular techniques and the role of the components (central server, secure module, biometric terminal, smart ca...

  1. The role of private non-profit healthcare organizations in NHS systems: Implications for the Portuguese hospital devolution program.

    Science.gov (United States)

    Almeida, Álvaro S

    2017-06-01

    The national health services (NHS) of England, Portugal, Finland and other single-payer universalist systems financed by general taxation, are based on the theoretical principle of an integrated public sector payer-provider. However, in practice one can find different forms of participation of non-public healthcare providers in those NHS, including private for profit providers, but also third sector non-profit organizations (NPO). This paper reviews the role of non-public non-profit healthcare organizations in NHS systems. By crossing a literature review on privatization of national health services with a literature review on the comparative performance of non-profit and for-profit healthcare organizations, this paper assesses the impact of contracting private non-profit healthcare organizations on the efficiency, quality and responsiveness of services, in public universal health care systems. The results of the review were then compared to the existing evidence on the Portuguese hospital devolution to NPO program. The evidence in this paper suggests that NHS health system reforms that transfer some public-sector hospitals to NPO should deliver improvements to the health system with minimal downside risks. The very limited existing evidence on the Portuguese hospital devolution program suggests it improved efficiency and access, without sacrificing quality. Copyright © 2017 Elsevier B.V. All rights reserved.

  2. Mission Need Statement: Calcine Disposition Project Major Systems Acquisition Project

    International Nuclear Information System (INIS)

    J. T. Beck

    2007-01-01

    This document identifies the need to establish the Calcine Disposition Project to determine and implement the final disposition of calcine including characterization, retrieval, treatment (if necessary), packaging, loading, onsite interim storage pending shipment to a repository or interim storage facility, and disposition of related facilities

  3. The Expert Project Management System (EPMS)

    Science.gov (United States)

    Silverman, Barry G.; Diakite, Coty

    1986-01-01

    Successful project managers (PMs) have been shown to rely on 'intuition,' experience, and analogical reasoning heuristics. For new PMs to be trained and experienced PMs to avoid repeating others' mistakes, it is necessary to make the knowledge and heuristics of successful PMs more widely available. The preparers have evolved a model of PM thought processes over the last decade that is now ready to be implemented as a generic PM aid. This aid consists of a series of 'specialist' expert systems (CRITIC, LIBRARIAN, IDEA MAN, CRAFTSMAN, and WRITER) that communicate with each other via a 'blackboard' architecture. The various specialist expert systems are driven to support PM training and problem solving since any 'answers' they pass to the blackboard are subjected to conflict identification (AGENDA FORMULATOR) and GOAL SETTER inference engines.

  4. Management of Virtual Machine as an Energy Conservation in Private Cloud Computing System

    Directory of Open Access Journals (Sweden)

    Fauzi Akhmad

    2016-01-01

    Full Text Available Cloud computing is a service model that is packaged in a base computing resources that can be accessed through the Internet on demand and placed in the data center. Data center architecture in cloud computing environments are heterogeneous and distributed, composed of a cluster of network servers with different capacity computing resources in different physical servers. The problems on the demand and availability of cloud services can be solved by fluctuating data center cloud through abstraction with virtualization technology. Virtual machine (VM is a representation of the availability of computing resources that can be dynamically allocated and reallocated on demand. In this study the consolidation of VM as energy conservation in Private Cloud Computing Systems with the target of process optimization selection policy and migration of the VM on the procedure consolidation. VM environment cloud data center to consider hosting a type of service a particular application at the instance VM requires a different level of computing resources. The results of the use of computing resources on a VM that is not balanced in physical servers can be reduced by using a live VM migration to achieve workload balancing. A practical approach used in developing OpenStack-based cloud computing environment by integrating Cloud VM and VM Placement selection procedure using OpenStack Neat VM consolidation. Following the value of CPU Time used as a fill to get the average value in MHz CPU utilization within a specific time period. The average value of a VM’s CPU utilization in getting from the current CPU_time reduced by CPU_time from the previous data retrieval multiplied by the maximum frequency of the CPU. The calculation result is divided by the making time CPU_time when it is reduced to the previous taking time CPU_time multiplied by milliseconds.

  5. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  6. Evaluating effectiveness and constraints of private sector agricultural extension services of the Green River Project in Imo and Rivers States, Nigeria

    Directory of Open Access Journals (Sweden)

    Onyinyechi I. Ogbonna

    2016-08-01

    Full Text Available Background: Oil exploration operations decreased the cultivable lands of rural people in the study area, leading to the establishment of the Green River Project (GRP. This study assessed the effectiveness and constraints of private sector extension services of GRP in Imo and Rivers States, Nigeria. Objectives: To analyse the roles and effectiveness of, as well as constraints to, the GRP in the area. Method: A multistage sampling technique was used to select 120 respondents. Descriptive statistics, factor analysis, chi square and t-test were used to analyse the data. Results: Roles of GRP in farming technologies dissemination included training of farmers on fish pond construction technique and maintenance of good pH levels. There was significant improvement in standard of living (X2 = 15.7; p ≤ 0.05 and size of production (t = 6.398; p ≤ 0.05 of the respondents after participation. In terms of the effectiveness of private sector deliveries on public policies, the programme had effect on beneficiaries’ access to credit, education of wards and poverty reduction. But it is worthy to note that the observed changes may not have been solely caused by the GRP, given that there could be many other factors affecting fish farming, either positively or negatively. Serious implementation constraints to effective performance of GRP included organisational, input and sustainability constraints. Conclusion: It was recommended that there should be timely provision of sufficient inputs to farmers and measures to improve organisation of private sector extension services in the area in order to enhance development.

  7. INVESTIGATING DEPRESSION SITUTATION OF THE STUDENTS WHO HAVE SETTLED WITH CENTRAL EXAMINATION SYSTEM AND PRIVATE ABILITY EXAM TO UNIVERSITY

    OpenAIRE

    Ercüment ERDOĞAN, Levent ÖZDEMİR

    2018-01-01

    The most often seen psychological problem is found as a depression in universty students. It causes to lose his fertility, to lose quality of his life. In addition this must be under debate as a public health problem. We aimed in our works to compare depression level of students who are settled in Cumhuriyet University with Central Exam System with students who are settled in Cumhuriyet University with Private Ability Exam. Also we aimed to explain the relation with socio demography depressio...

  8. Adherence of private health system hospitals to dissemination of outcomes according to the Global Reporting Initiative (GRI) model

    OpenAIRE

    Machado Junior, Celso; César, Robson Danúbio da Silva; Souza, Maria Tereza Saraiva de

    2017-01-01

    ABSTRACT Objective To verify if there is an analogy between the indicators of the Global Reporting Initiative adopted by hospitals in the private healthcare system. Methods Documentary research supported by reports that are electronically available on the website of the companies surveyed. Results The organizations surveyed had a significant adherence of their economic, social and environmental indicators of the model proposed by the Global Reporting Initiative, showing an analogous fie...

  9. Adherence of private health system hospitals to dissemination of outcomes according to the Global Reporting Initiative (GRI) model

    OpenAIRE

    Machado, Celso; César, Robson Danúbio da Silva; de Souza, Maria Tereza Saraiva

    2017-01-01

    ABSTRACT Objective To verify if there is an analogy between the indicators of the Global Reporting Initiative adopted by hospitals in the private healthcare system. Methods Documentary research supported by reports that are electronically available on the website of the companies surveyed. Results The organizations surveyed had a significant adherence of their economic, social and environmental indicators of the model proposed by the Global Reporting Initiative, showing an analogous field of ...

  10. Demand for private healthcare in a universal public healthcare system: empirical evidence from Sri Lanka.

    Science.gov (United States)

    Pallegedara, Asankha; Grimm, Michael

    2017-11-01

    This paper examines healthcare utilization behaviour in Sri Lanka with special emphasis on the choice between costly private and free public healthcare services. We use a data set that combines nationwide household survey data and district level healthcare supply data. Our findings suggest that even with universal public healthcare policy, richer people tend to use private sector healthcare services rather than public services. We also find significant regional and ethnic discrepancies in healthcare access bearing the risk of social tensions if these are further amplified. Latent class analysis shows in addition that the choice between private and public sector healthcare significantly differs between people with and without chronic diseases. We find in particular that chronically ill people rely for their day-to-day care on the public sector, but for their inpatient care they turn more often than non-chronically ill people to the private sector, implying an additional financial burden for the chronically ill. If the observed trend continues it may not only increase further the health-income gradient in Sri Lanka but also undermine the willingness of the middle class to pay taxes to finance public healthcare. © The Author 2017. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  11. A system for optimizing of private house owner's spending and benefits

    NARCIS (Netherlands)

    Tempelmans Plat, H.; Ruokolainen, A.

    1998-01-01

    Investment decisions about privately-owned houses are usually based on limited investment budget and vague information about choice alternatives available. Since a household buying a dwelling has to compare the housing expenditure with other expenditures, the financial consequences of the housing

  12. Toward Building a Sustainable Retirement System for Private Colleges and Universities in Japan

    Science.gov (United States)

    Watanabe, Satoshi P.

    2010-01-01

    As retiring personnel of Japan's private higher educational institutions (HEIs) take a large portion of the accumulated retirement funds at their career exit today, their younger colleagues are left with a bleak future with a quickly depleting reserve for their own retirement allowances. The fact that many insolvent organizations are on the verge…

  13. System building in the Kenyan electrification regime: The case of private solar mini-grid development

    DEFF Research Database (Denmark)

    Pedersen, Mathilde Brix; Nygaard, Ivan

    2018-01-01

    acceptance of the niche technology by constructing a shared world view between niche and regime actors. Interestingly, niche actors also engage in normative work to establish positive normative associations with the private-sector model, like equity and social justice. The research concludes...

  14. Nr 17 - Private bill aiming at preparing transition towards a energy efficient system

    International Nuclear Information System (INIS)

    Bartolone, Claude

    2012-01-01

    This private bill indicates which new articles and which modifications are introduced in the French energy code to implement progressive energy tariffs and favour energy savings by households. These new articles define how a bonus-malus on household energy consumptions is determined. They also define accompanying measures

  15. Private Roads

    NARCIS (Netherlands)

    Verhoef, Erik T.

    2007-01-01

    This paper studies the efficiency impacts of private toll roads in initially untolled networks. The analysis allows for capacity and toll choice by private operators, and endogenizes entry and therewith the degree of competition, distinguishing and allowing for both parallel and serial competition.

  16. Controlled Ecological Life Support System Breadboard Project - 1988

    Science.gov (United States)

    Knott, W. M.

    1989-01-01

    The Controlled Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989-1993 are listed. The biomass production chamber to be used by the project is described.

  17. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  18. Project W-049H Collection System Acceptance Test

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) Program for Project W-049H covers the following activities: Disposal system, Collection system, Instrumentation and control system. Each activity has its own ATP. The purpose of the ATPs is to verify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. This ATP has been prepared to demonstrate that the Collection System Instrumentation functions as required by project criteria

  19. Private initiatives and policy options: recent health system experience in India.

    Science.gov (United States)

    Purohit, B C

    2001-03-01

    In the recent past the impact of structural adjustment in the Indian health care sector has been felt in the reduction in central grants to States for public health and disease control programmes. This falling share of central grants has had a more pronounced impact on the poorer states, which have found it more difficult to raise local resources to compensate for this loss of revenue. With the continued pace of reforms, the likelihood of increasing State expenditure on the health care sector is limited in the future. As a result, a number of notable trends are appearing in the Indian health care sector. These include an increasing investment by non-resident Indians (NRIs) in the hospital industry, leading to a spurt in corporatization in the States of their original domicile and an increasing participation by multinational companies in diagnostics aiming to capture the potential of the Indian health insurance market. The policy responses to these private initiatives are reflected in measures comprising strategies to attract private sector participation and management inputs into primary health care centres (PHCs), privatization or semi-privatization of public health facilities such as non-clinical services in public hospitals, innovating ways to finance public health facilities through non-budgetary measures, and tax incentives by the State governments to encourage private sector investment in the health sector. Bearing in mind the vital importance of such market forces and policy responses in shaping the future health care scenario in India, this paper examines in detail both of these aspects and their implications for the Indian health care sector. The analysis indicates that despite the promising newly emerging atmosphere, there are limits to market forces; appropriate refinement in the role of government should be attempted to avoid undesirable consequences of rising costs, increasing inequity and consumer exploitation. This may require opening the health

  20. National Unmanned Aircraft Systems Project Office

    Science.gov (United States)

    Goplen, Susan E.; Sloan, Jeff L.

    2015-01-01

    The U.S. Geological Survey (USGS) National Unmanned Aircraft Systems (UAS) Project Office leads the implementation of UAS technology in the Department of the Interior (DOI). Our mission is to support the transition of UAS into DOI as a new cost-effective tool for collecting remote-sensing data to monitor environmental conditions, respond to natural hazards, recognize the consequences and benefits of land and climate change and conduct wildlife inventories. The USGS is teaming with all DOI agencies and academia as well as local, State, and Tribal governments with guidance from the Federal Aviation Administration and the DOI Office of Aviation Services (OAS) to lead the safe, efficient, costeffective and leading-edge adoption of UAS technology into the scientific research and operational activities of the DOI.

  1. Oilfield Flare Gas Electricity Systems (OFFGASES Project)

    Energy Technology Data Exchange (ETDEWEB)

    Rachel Henderson; Robert Fickes

    2007-12-31

    The Oilfield Flare Gas Electricity Systems (OFFGASES) project was developed in response to a cooperative agreement offering by the U.S. Department of Energy (DOE) and the National Energy Technology Laboratory (NETL) under Preferred Upstream Management Projects (PUMP III). Project partners included the Interstate Oil and Gas Compact Commission (IOGCC) as lead agency working with the California Energy Commission (CEC) and the California Oil Producers Electric Cooperative (COPE). The project was designed to demonstrate that the entire range of oilfield 'stranded gases' (gas production that can not be delivered to a commercial market because it is poor quality, or the quantity is too small to be economically sold, or there are no pipeline facilities to transport it to market) can be cost-effectively harnessed to make electricity. The utilization of existing, proven distribution generation (DG) technologies to generate electricity was field-tested successfully at four marginal well sites, selected to cover a variety of potential scenarios: high Btu, medium Btu, ultra-low Btu gas, as well as a 'harsh', or high contaminant, gas. Two of the four sites for the OFFGASES project were idle wells that were shut in because of a lack of viable solutions for the stranded noncommercial gas that they produced. Converting stranded gas to useable electrical energy eliminates a waste stream that has potential negative environmental impacts to the oil production operation. The electricity produced will offset that which normally would be purchased from an electric utility, potentially lowering operating costs and extending the economic life of the oil wells. Of the piloted sites, the most promising technologies to handle the range were microturbines that have very low emissions. One recently developed product, the Flex-Microturbine, has the potential to handle the entire range of oilfield gases. It is deployed at an oilfield near Santa Barbara to run on waste gas

  2. Economic Evaluation of PCSK9 Inhibitors in Reducing Cardiovascular Risk from Health System and Private Payer Perspectives.

    Directory of Open Access Journals (Sweden)

    Alejandro Arrieta

    Full Text Available The introduction of Proprotein covertase subtilisin/kexin type 9 (PCSK9 inhibitors has been heralded as a major advancement in reducing low-density lipoprotein cholesterol levels by nearly 50%. However, concerns have been raised on the added value to the health care system in terms of their costs and benefits. We assess the cost-effectiveness of PCSK9 inhibitors based on a decision-analytic model with existing clinical evidence. The model compares a lipid-lowering therapy based on statin plus PCSK9 inhibitor treatment with statin treatment only (standard therapy. From health system perspective, incremental cost per quality adjusted life years (QALYs gained are presented. From a private payer perspective, return-on-investment and net present values over patient lifespan are presented. At the current annual cost of $14,000 to $15,000, PCSK9 inhibitors are not cost-effective at an incremental cost of about $350,000 per QALY. Moreover, for every dollar invested in PCSK9 inhibitors, the private payer loses $1.98. Our study suggests that the annual treatment price should be set at $4,250 at a societal willingness-to-pay of $100,000 per QALY. However, we estimate the breakeven price for private payer is only $600 per annual treatment. At current prices, our study suggests that PCSK9 inhibitors do not add value to the U.S. health system and their provision is not profitable for private payers. To be the breakthrough drug in the fight against cardiovascular disease, the current price of PCSK9 inhibitors must be reduced by more than 70%.

  3. The Earth System Grid Federation (ESGF) Project

    Science.gov (United States)

    Carenton-Madiec, Nicolas; Denvil, Sébastien; Greenslade, Mark

    2015-04-01

    The Earth System Grid Federation (ESGF) Peer-to-Peer (P2P) enterprise system is a collaboration that develops, deploys and maintains software infrastructure for the management, dissemination, and analysis of model output and observational data. ESGF's primary goal is to facilitate advancements in Earth System Science. It is an interagency and international effort led by the US Department of Energy (DOE), and co-funded by National Aeronautics and Space Administration (NASA), National Oceanic and Atmospheric Administration (NOAA), National Science Foundation (NSF), Infrastructure for the European Network of Earth System Modelling (IS-ENES) and international laboratories such as the Max Planck Institute for Meteorology (MPI-M) german Climate Computing Centre (DKRZ), the Australian National University (ANU) National Computational Infrastructure (NCI), Institut Pierre-Simon Laplace (IPSL), and the British Atmospheric Data Center (BADC). Its main mission is to support current CMIP5 activities and prepare for future assesments. The ESGF architecture is based on a system of autonomous and distributed nodes, which interoperate through common acceptance of federation protocols and trust agreements. Data is stored at multiple nodes around the world, and served through local data and metadata services. Nodes exchange information about their data holdings and services, trust each other for registering users and establishing access control decisions. The net result is that a user can use a web browser, connect to any node, and seamlessly find and access data throughout the federation. This type of collaborative working organization and distributed architecture context en-lighted the need of integration and testing processes definition to ensure the quality of software releases and interoperability. This presentation will introduce the ESGF project and demonstrate the range of tools and processes that have been set up to support release management activities.

  4. How can innovative project delivery systems improve the overall efficiency of GDOT in transportation project delivery?

    Science.gov (United States)

    2013-04-01

    The USDOT and Federal Highway Administration (FHWA) recommend the smart use of innovative project : delivery systems, such as design-build, to improve efficiency and effectiveness of developing transportation : projects. Although design-build provide...

  5. New Project System for Undergraduate Electronic Engineering

    Science.gov (United States)

    Chiu, Dirk M.; Chiu, Shen Y.

    2005-01-01

    A new approach to projects for undergraduate electronic engineering in an Australian university has been applied successfully for over 10 years. This approach has a number of projects running over three year period. Feedback from past graduates and their managers has confirmed that these projects train the students well, giving them the ability…

  6. Effects of an incinerator project on a healthcare-waste management system.

    Science.gov (United States)

    Khammaneechan, Patthanasak; Okanurak, Kamolnetr; Sithisarankul, Pornchai; Tantrakarnapa, Kraichat; Norramit, Poonsup

    2011-10-01

    This evaluative research study aimed to assess the effects of the central healthcare incinerator project on waste management in Yala Province. The study data were collected twice: at baseline and during the operational phase. A combination of structured interview and observation were used during data collection. The study covered 127 healthcare facilities: government hospitals, healthcare centres, and private clinics. The results showed 63% of healthcare risk waste (HCRW) handlers attended the HCRW management training. Improvements in each stage of the HCRW management system were observed in all groups of facilities. The total cost of the HCRW management system did not change, however; the costs for hospitals decreased, whereas those for clinics increased significantly. It was concluded that the central healthcare waste incinerator project positively affected HCRW management in the area, although the costs of management might increase for a particular group. However, the benefits of changing to a more appropriately managed HCRW system will outweigh the increased costs.

  7. Assessment of health care needs and utilization in a mixed public-private system: the case of the Athens area

    Directory of Open Access Journals (Sweden)

    Niakas Dimitris

    2006-11-01

    Full Text Available Abstract Background Given the public-private mix of the Greek health system, the purpose of this study was to assess whether variations in the utilisation of health services, both primary and inpatient care, were associated with underlying health care needs and/or various socio-economic factors. Methods Data was obtained from a representative sample (N = 1426 residing in the broader Athens area (response rate 70.6%. Perceived health-related quality of life (HRQOL, as measured by the physical and mental summary component scores of the SF-36 Health Survey, was used as a proxy of health care need. Health care utilization was measured by a last-month visits to public sector physicians, b last-month visits to private sector physicians, c last-year visits to hospital emergency departments and d last-year hospital admissions. Statistical analysis involved the implementation of logistic regression models. Results Health care need was the factor most strongly associated with all measures of health care utilization, except for visits to public physicians. Women, elderly, less wealthy and individuals of lower physical health status visited physicians contracted to their insurance fund (public sector. Women, well educated and those once again of lower physical health status were more likely to visit private providers. Visits to hospital emergency departments and hospital admissions were related to need and no socio-economic factor was related to the use of those types of care. Conclusion This study has demonstrated a positive relationship between health care need and utilisation of health services within a mixed public-private health care system. Concurrently, interesting differences are evident in the utilization of various types of services. The results have potential implications in health policy-making and particularly in the proper allocation of scarce health resources.

  8. Assessment of health care needs and utilization in a mixed public-private system: the case of the Athens area.

    Science.gov (United States)

    Pappa, Evelina; Niakas, Dimitris

    2006-11-02

    Given the public-private mix of the Greek health system, the purpose of this study was to assess whether variations in the utilisation of health services, both primary and inpatient care, were associated with underlying health care needs and/or various socio-economic factors. Data was obtained from a representative sample (N = 1426) residing in the broader Athens area (response rate 70.6%). Perceived health-related quality of life (HRQOL), as measured by the physical and mental summary component scores of the SF-36 Health Survey, was used as a proxy of health care need. Health care utilization was measured by a) last-month visits to public sector physicians, b) last-month visits to private sector physicians, c) last-year visits to hospital emergency departments and d) last-year hospital admissions. Statistical analysis involved the implementation of logistic regression models. Health care need was the factor most strongly associated with all measures of health care utilization, except for visits to public physicians. Women, elderly, less wealthy and individuals of lower physical health status visited physicians contracted to their insurance fund (public sector). Women, well educated and those once again of lower physical health status were more likely to visit private providers. Visits to hospital emergency departments and hospital admissions were related to need and no socio-economic factor was related to the use of those types of care. This study has demonstrated a positive relationship between health care need and utilisation of health services within a mixed public-private health care system. Concurrently, interesting differences are evident in the utilization of various types of services. The results have potential implications in health policy-making and particularly in the proper allocation of scarce health resources.

  9. Exploration Medical System Demonstration (EMSD) Project

    Science.gov (United States)

    Chin, Duane

    2012-01-01

    The Exploration Medical System Demonstration (EMSD) is a project under the Exploration Medical Capability (ExMC) element managed by the Human Research Program (HRP). The vision for the EMSD is to utilize ISS as a test bed to show that several medical technologies needed for an exploration mission and medical informatics tools for managing evidence and decision making can be integrated into a single system and used by the on-orbit crew in an efficient and meaningful manner. Objectives: a) Reduce and even possibly eliminate the time required for on-orbit crew and ground personnel (which include Surgeon, Biomedical Engineer (BME) Flight Controller, and Medical Operations Data Specialist) to access and move medical data from one application to another. b) Demonstrate that the on-orbit crew has the ability to access medical data/information using an intuitive and crew-friendly software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management framework and architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities.

  10. Integrating configuration workflows with project management system

    International Nuclear Information System (INIS)

    Nilsen, Dimitri; Weber, Pavel

    2014-01-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  11. The costs of paying: Private and social costs of cash and card systems

    OpenAIRE

    Bergman, Mats; Guibourg, Gabriela; Segendorf, Björn

    2007-01-01

    Despite the central role of payments in theoretical and policy oriented economics, there is surprisingly little known about the costs of different payment instruments. We estimate social and private costs of cash, debit and credit card payments in Sweden in 2002. The combined social cost of providing these payment services is approximately 0.4 per cent of GDP. Debit and credit cards are socially less costly than cash for payments above EURO 8 and EURO 18, respectively. Corresponding threshold...

  12. The Coalition for Sustainable Egg Supply: A unique public-private partnership for conducting research on the sustainability of animal housing systems using a multistakeholder approach.

    Science.gov (United States)

    Mench, J A; Swanson, J C; Arnot, C

    2016-03-01

    The growing emphasis on ensuring the sustainability of animal agriculture is providing an impetus for the adoption of new approaches to structuring and conducting research. Sustainability is a complex topic involving many considerations related to the economic, social, and environmental impacts of production systems. Successfully addressing this topic requires multidisciplinary research as well as a high degree of communication with food system stakeholders to ensure that the research results contribute to informed decision making. In this paper, we provide an overview of a public-private partnership, the Coalition for Sustainable Egg Supply (CSES), which was formed to support research evaluating the sustainability of laying hen housing systems. Because of increasing public concerns about the behavioral restriction imposed on laying hens housed in conventional cages, the U.S. egg industry is faced with a need to transition to alternative systems. However, before the CSES project, there was limited information available about how this transition might affect trade-offs related to the sustainability of egg production. The goal of the CSES project was to provide this information by conducting holistic research on a commercial farm that had 3 different hen housing systems. The CSES members represented a variety of stakeholders, including food retailers and distributors, egg producers, universities, and governmental (USDA ARS) and nongovernmental organizations. The CSES was facilitated by a not-for-profit intermediary, the Center for Food Integrity, which was also responsible for communicating the research results to food system stakeholders, including via quantitative and qualitative consumer research. In this paper, we describe the structural aspects of the CSES that were responsible for the successful completion and dissemination of the research as well as the insights that were gained regarding multidisciplinary and multi-institutional collaboration, conducting

  13. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  14. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  15. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  16. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  17. System design projects for undergraduate design education

    Science.gov (United States)

    Batill, S. M.; Pinkelman, J.

    1993-01-01

    Design education has received considerable in the recent past. This paper is intended to address one aspect of undergraduate design education and that is the selection and development of the design project for a capstone design course. Specific goals for a capstone design course are presented and their influence on the project selection are discussed. The evolution of a series of projects based upon the design of remotely piloted aircraft is presented along with students' perspective on the capstone experience.

  18. Solving Conic Systems via Projection and Rescaling

    OpenAIRE

    Pena, Javier; Soheili, Negar

    2015-01-01

    We propose a simple projection and rescaling algorithm to solve the feasibility problem \\[ \\text{ find } x \\in L \\cap \\Omega, \\] where $L$ and $\\Omega$ are respectively a linear subspace and the interior of a symmetric cone in a finite-dimensional vector space $V$. This projection and rescaling algorithm is inspired by previous work on rescaled versions of the perceptron algorithm and by Chubanov's projection-based method for linear feasibility problems. As in these predecessors, each main it...

  19. Information systems project management: methods, tools, and techniques

    OpenAIRE

    Mcmanus, John; Wood-Harper, Trevor

    2004-01-01

    Information Systems Project Management offers a clear and logical exposition of how to plan, organise and monitor projects effectively in order to deliver quality information systems within time, to budget and quality. This new book by John McManus and Trevor Wood-Harper is suitable for upper level undergraduates and postgraduates studying project management and Information Systems. Practising managers will also find it to be a valuable tool in their work. Managing information systems pro...

  20. Research on Risk Allocation of Public-private Partnership Projects based on Rough Set Theory%基于粗糙集理论的PPP项目风险分担研究

    Institute of Scientific and Technical Information of China (English)

    巴希; 乌云娜; 胡新亮; 李泽众

    2013-01-01

      公私合作制将私人资本、技术和管理经验引入基础设施建设及运营项目,发挥了巨大的经济效益和社会效益。在我国公私合作项目的实践过程中,风险分担不明确始终是阻碍该模式在基础设施投融资领域进行广泛推广的关键因素,严重时甚至导致项目的失败。针对承担风险的主体不确定这一影响公私双方持久稳定合作的问题,通过案例分析和文献研究识别出风险分担主体不明确的风险因素,在此基础上利用粗糙集方法对风险分担评价指标体系中指标进行属性约简,以剔除对于分担结果影响较小的因素。理想点法能够对具有不同风险分担偏好的评价人做出的风险承担选择进行评价,以确定合理的风险分担方案。评价结果为公私双方制定合理的风险分担方案提供参考。%Public-Private-Partnership introduces private capital, technology and management experience into infrastructure con-struction and operation of projects, which brings huge economic and social benefits. In the practice of public-private partnership pro-ject, the unclear risk-sharing is always the key factor hindering the PPP pattern to widely promote in infrastructure investment and fi-nancing, even lead to project failure. Aimed at the uncertainty of main body bearing risk, which affects the lasting stability of Public-Private-Partnership. Through case studies and literature research, this paper identified the risk factors which has unclear risk-sharing body. On this basis, using Rough Set method to evaluate the risk-sharing index system and reduce the attributes which affect the risk-sharing result least. The TOPSIS method can evaluate the program by the people with different risk-sharing preferences that will deter-mine the most reasonable one. Meantime, the evaluation results provide a reference for both public and private to develop a reasonable risk-sharing scheme.

  1. Small public private partnerships

    DEFF Research Database (Denmark)

    Koch, Christian; Jensen, Jesper Ole

    2009-01-01

    Public Private Partnerships (PPP) are frequently mobilized as a purchasing form suitable for large infrastructure projects. And it is commonly assumed that transaction costs linked to the establishment of PPP make them prohibitive in small sizes. In a Danish context this has been safeguarded by t...

  2. Projective measurements in quantum and classical optical systems

    CSIR Research Space (South Africa)

    Roux, FS

    2014-09-01

    Full Text Available equally well to both classical and quantum optical systems. A projective measurement, in the context of quantum mechanics, is understood to be the process where a projection operator operates on some input state. Often this projection operator is composed...) Projective measurements in quantum and classical optical systems Filippus S. Roux* and Yingwen Zhang CSIR National Laser Centre, P.O. Box 395, Pretoria 0001, South Africa (Received 3 July 2014; published 22 September 2014) Experimental setups for the optical...

  3. Controlled ecological life support system breadboard project, 1988

    Science.gov (United States)

    Knott, W. M.

    1990-01-01

    The Closed Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989 to 1993 are listed. The Biomass Production Chamber (BPC) became operational and tests of wheat as a single crop are nearing completion.

  4. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  5. The Analysis of Project Finance: a Case Study of Kazakhstan Caspian Transportation System Project

    OpenAIRE

    Serikbayeva, Aigul

    2011-01-01

    Although project finance is a large and fast growing field in finance, there has been very little academic research in that area. The main reason for this deficit is that it is a relatively new sphere in finance and it is difficult to access the information about the implementation of projects from the companies that implement them. This project will provide an overview of how companies finance large infrastructure projects through a case study of the Kazakhstan Caspian Transportation System ...

  6. Laser display system for multi-depth screen projection scenarios.

    Science.gov (United States)

    La Torre, J Pablo; Mayes, Nathan; Riza, Nabeel A

    2017-11-10

    Proposed is a laser projection display system that uses an electronically controlled variable focus lens (ECVFL) to achieve sharp and in-focus image projection over multi-distance three-dimensional (3D) conformal screens. The system also functions as an embedded distance sensor that enables 3D mapping of the multi-level screen platform before the desired laser scanned beam focused/defocused projected spot sizes are matched to the different localized screen distances on the 3D screen. Compared to conventional laser scanning and spatial light modulator (SLM) based projection systems, the proposed design offers in-focus non-distorted projection over a multi-distance screen zone with varying depths. An experimental projection system for a screen depth variation of 65 cm is demonstrated using a 633 nm laser beam, 3 KHz scan speed galvo-scanning mirrors, and a liquid-based ECVFL. As a basic demonstration, an in-house developed MATLAB based graphic user interface is deployed to work along with the laser projection display, enabling user inputs like text strings or predefined image projection. The user can specify projection screen distance, scanned laser linewidth, projected text font size, projected image dimensions, and laser scanning rate. Projected images are shown highlighting the 3D control capabilities of the display, including the production of a non-distorted image onto two-depths versus a distorted image via dominant prior-art projection methods.

  7. A local initiative for energy efficiency improvements in motor driven systems in public and private companies - case studies

    Energy Technology Data Exchange (ETDEWEB)

    Tamm, G. [Behoerde fuer Stadtentwicklung und Umwelt, Hamburg (Germany)

    2005-07-01

    In the free and hanseatic town Hamburg reduction potentials in public buildings are developed systematically in the context of the energy management by standardised efficiency programs. The City has had special means ready for financing energy saving measures for many years, because the investments amortize themselves by the operation cost reduction. Examples of efficient electrical motor systems in public buildings: ventilation facilities and air conditioning, heating pumps energy saving program. The city of Hamburg also offers a promotional program ''enterprises for resource protection'' for private investors from the Hamburg economy. With this program voluntary investment measures are initiated in private enterprises by financial subsidies to conserving resources. Examples of efficient electrical motor driven systems in enterprises: mill: speed controlled exhauster drives, spice mill: speed controlled mill drives, printer: efficient ventilation techniques at a paper exhaust system, wastewater treatment: adjustable fans for pressure aerators, hazardous waste incineration plant: optimisation of the SO{sub 2}-gas scrubbing system by mass flow controlled pumps. With these programs efforts to climate protection can be realised more economically. (orig.)

  8. RISK ASSESSMENT MODELS OF PUBLIC-PRIVATE PARTNERSHIP IN THE ROAD SECTOR

    Directory of Open Access Journals (Sweden)

    V. V. Gasilov

    2013-01-01

    Full Text Available This article studies the main potential models of public-private partnership; it gives evaluation of risks for these models, considering their distribution between members of partnership. It offers the mechanism of making an optimal choice of a public-private partnership model for projects of transport system development.

  9. Open source system OpenVPN in a function of Virtual Private Network

    Science.gov (United States)

    Skendzic, A.; Kovacic, B.

    2017-05-01

    Using of Virtual Private Networks (VPN) can establish high security level in network communication. VPN technology enables high security networking using distributed or public network infrastructure. VPN uses different security and managing rules inside networks. It can be set up using different communication channels like Internet or separate ISP communication infrastructure. VPN private network makes security communication channel over public network between two endpoints (computers). OpenVPN is an open source software product under GNU General Public License (GPL) that can be used to establish VPN communication between two computers inside business local network over public communication infrastructure. It uses special security protocols and 256-bit Encryption and it is capable of traversing network address translators (NATs) and firewalls. It allows computers to authenticate each other using a pre-shared secret key, certificates or username and password. This work gives review of VPN technology with a special accent on OpenVPN. This paper will also give comparison and financial benefits of using open source VPN software in business environment.

  10. Alternative energy technologies for private households - diffusion of solar collector systems

    Energy Technology Data Exchange (ETDEWEB)

    Krusche, H

    1979-01-01

    The study gives an estimate of the market potential for solar collectors in the Federal Republic of Germany and reports the results of a survey of first generation private users. It shows that these first users of solar collectors have social and personal charactristics similar to innovators in other areas as described in adoption and diffusion research. Compared with the average houseowner, first users of solar collectors tend to be younger, earn more and be better educated; to be professionally involved with building and heating and have some technical training; to be active information seekers and media users; to be socially active and well-integrated; to actively promote further diffusion of solar collectors. The study also shows that solar collectors are used for the purpose of room heating to an unexpectedly high degree; that the level of satisfaction with appliances and service is unexpectedly high and that the social environment of first users shows very little resistance to the introduction of solar collectors. Finally, it is shown that first users are more ecologically conscious than the average houseowner. The majority of first users attributes their decision to adopt solar technology to a lesser degree or at least not more than equally to economic-technical considerations than to ecological considerations. First users are generally fascinated by technically sweet consumption goods and can be characterized as technical optimists in their outlook on the future. Conclusions for social marketing of solar technology for the private household are drawn.

  11. The no-project alternative analysis: An early product of the Tahoe Decision Support System

    Science.gov (United States)

    Halsing, David L.; Hessenflow, Mark L.; Wein, Anne

    2005-01-01

    We report on the development of a No-project alternative analysis (NPAA) or “business as usual” scenario with respect to a 20-year projection of 21 indicators of environmental and socioeconomic conditions in the Lake Tahoe Basin for the Tahoe Regional Planning Agency (TRPA). Our effort was inspired by earlier work that investigated the tradeoffs between an environmental and an economic objective. The NPAA study has implications for a longer term goal of building a Tahoe Decision Support System (TDSS) to assist the TRPA and other Basin agencies in assessing the outcomes of management strategies. The NPAA assumes no major deviations from current management practices or from recent environmental or societal trends and planned Environmental Improvement Program (EIP) projects. Quantitative “scenario generation” tools were constructed to simulate site-specific land uses, various population categories, and associated vehicle miles traveled. Projections of each indicator’s attainment status were made by building visual conceptual models of the relevant natural and social processes, extrapolating trends, and using available models, research, and expert opinion. We present results of the NPAA, projected indicator status, key factors affecting the indicators, indicator functionality, and knowledge gaps. One important result is that current management practices may slow the loss or degradation of environmental qualities but not halt or reverse it. Our analysis also predicts an increase in recreation and commuting into and within the basin, primarily in private vehicles. Private vehicles, which are a critical mechanism by which the Basin population affects the surrounding environment, are a key determinant of air-quality indicators, a source of particulate matter affecting Secchi depth, a source of noise, and a factor in recreational and scenic quality, largely owing to congestion. Key uncertainties in the NPAA include climate change, EIP project effectiveness, and

  12. The Individual Limited Liability Company in the Brazilian Legal System and Portuguese Experience of Single Shareholder Private Companies

    Directory of Open Access Journals (Sweden)

    Eugênio Duarte Vasques

    2016-11-01

    Full Text Available The scope of this essay is to analyze aspects of individual limited liability company in the Brazilian legal system, which raises the issue of the requirement of minimum capital contribution to the company’s constitution. Therefore, we seek to expose initially the historical responsibility of the individual entrepreneur, and then the current context of Portuguese single shareholder private companies. After these considerations, we focus on addressing the situation of the individual entrepreneur in Brazil and the creation of a new species of corporation that guarantees the limitation of liability to the individual entrepreneur in a manner similar to the Portuguese experience.

  13. Adherence of private health system hospitals to dissemination of outcomes according to the Global Reporting Initiative (GRI) model.

    Science.gov (United States)

    Machado, Celso; César, Robson Danúbio da Silva; Souza, Maria Tereza Saraiva de

    2017-01-01

    To verify if there is an analogy between the indicators of the Global Reporting Initiative adopted by hospitals in the private healthcare system. Documentary research supported by reports that are electronically available on the website of the companies surveyed. The organizations surveyed had a significant adherence of their economic, social and environmental indicators of the model proposed by the Global Reporting Initiative, showing an analogous field of common indicators between them. There is similarity between the indicators adopted by companies, but one of the hospitals analyzed had a greater number of converging indicators to Global Reporting Initiative.

  14. Poland, assuring and strengthening the quality of (private) higher education : One of twelve case studies produced as part of the project on structural reform in higher education

    NARCIS (Netherlands)

    Kwiek, Marek; Antonowicz, Dominik; Westerheijden, Donald F.

    2016-01-01

    This study analyses how different types of system-level (or ‘landscape’) structural reforms in higher education have been designed and implemented in selected higher education systems. In the 12 case studies that form the core of the project, the researchers examine reforms aimed at:• Increasing

  15. Virtual fringe projection system with nonparallel illumination based on iteration

    International Nuclear Information System (INIS)

    Zhou, Duo; Wang, Zhangying; Gao, Nan; Zhang, Zonghua; Jiang, Xiangqian

    2017-01-01

    Fringe projection profilometry has been widely applied in many fields. To set up an ideal measuring system, a virtual fringe projection technique has been studied to assist in the design of hardware configurations. However, existing virtual fringe projection systems use parallel illumination and have a fixed optical framework. This paper presents a virtual fringe projection system with nonparallel illumination. Using an iterative method to calculate intersection points between rays and reference planes or object surfaces, the proposed system can simulate projected fringe patterns and captured images. A new explicit calibration method has been presented to validate the precision of the system. Simulated results indicate that the proposed iterative method outperforms previous systems. Our virtual system can be applied to error analysis, algorithm optimization, and help operators to find ideal system parameter settings for actual measurements. (paper)

  16. Adaptive projective synchronization of different chaotic systems with nonlinearity inputs

    International Nuclear Information System (INIS)

    Niu Yu-Jun; Pei Bing-Nan; Wang Xing-Yuan

    2012-01-01

    We investigate the projective synchronization of different chaotic systems with nonlinearity inputs. Based on the adaptive technique, sliding mode control method and pole assignment technique, a novel adaptive projective synchronization scheme is proposed to ensure the drive system and the response system with nonlinearity inputs can be rapidly synchronized up to the given scaling factor. (general)

  17. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  18. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  19. The SIMPSONS project: An integrated Mars transportation system

    Science.gov (United States)

    Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett

    In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.

  20. Advanced Ground Systems Maintenance Enterprise Architecture Project

    Science.gov (United States)

    Perotti, Jose M. (Compiler)

    2015-01-01

    The project implements an architecture for delivery of integrated health management capabilities for the 21st Century launch complex. The delivered capabilities include anomaly detection, fault isolation, prognostics and physics based diagnostics.

  1. The role and uptake of private health insurance in different health care systems: are there lessons for developing countries?

    Directory of Open Access Journals (Sweden)

    Odeyemi IA

    2013-03-01

    Full Text Available Isaac AO Odeyemi,1 John Nixon21Senior Director and Head of Health Economics and Outcomes Research, Astellas Pharma UK Ltd, Chertsey, UK; 2Teaching Associate in Health Economics, Department of Economics and Related Studies, University of York, York, UKBackground: Social and national health insurance schemes are being introduced in many developing countries in moving towards universal health care. However, gaps in coverage are common and can only be met by out-of-pocket payments, general taxation, or private health insurance (PHI. This study provides an overview of PHI in different health care systems and discusses factors that affect its uptake and equity.Methods: A representative sample of countries was identified (United States, United Kingdom, The Netherlands, France, Australia, and Latvia that illustrates the principal forms and roles of PHI. Literature describing each country's health care system was used to summarize how PHI is utilized and the factors that affect its uptake and equity.Results: In the United States, PHI is a primary source of funding in conjunction with tax-based programs to support vulnerable groups; in the UK and Latvia, PHI is used in a supplementary role to universal tax-based systems; in France and Latvia, complementary PHI is utilized to cover gaps in public funding; in The Netherlands, PHI is supplementary to statutory private and social health insurance; in Australia, the government incentivizes the uptake of complementary PHI through tax rebates and penalties. The uptake of PHI is influenced by age, income, education, health care system typology, and the incentives or disincentives applied by governments. The effect on equity can either be positive or negative depending on the type of PHI adopted and its role within the wider health care system.Conclusion: PHI has many manifestations depending on the type of health care system used and its role within that system. This study has illustrated its common applications

  2. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    Energy Technology Data Exchange (ETDEWEB)

    SPENCER, S.G.

    1999-04-26

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates.

  3. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    International Nuclear Information System (INIS)

    SPENCER, S.G.

    1999-01-01

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates

  4. Leveraging human capital to reduce maternal mortality in India: enhanced public health system or public-private partnership?

    Science.gov (United States)

    Krupp, Karl; Madhivanan, Purnima

    2009-02-27

    Developing countries are currently struggling to achieve the Millennium Development Goal Five of reducing maternal mortality by three quarters between 1990 and 2015. Many health systems are facing acute shortages of health workers needed to provide improved prenatal care, skilled birth attendance and emergency obstetric services - interventions crucial to reducing maternal death. The World Health Organization estimates a current deficit of almost 2.4 million doctors, nurses and midwives. Complicating matters further, health workforces are typically concentrated in large cities, while maternal mortality is generally higher in rural areas. Additionally, health care systems are faced with shortages of specialists such as anaesthesiologists, surgeons and obstetricians; a maldistribution of health care infrastructure; and imbalances between the public and private health care sectors. Increasingly, policy-makers have been turning to human resource strategies to cope with staff shortages. These include enhancement of existing work roles; substitution of one type of worker for another; delegation of functions up or down the traditional role ladder; innovation in designing new jobs;transfer or relocation of particular roles or services from one health care sector to another. Innovations have been funded through state investment, public-private partnerships and collaborations with nongovernmental organizations and quasi-governmental organizations such as the World Bank. This paper focuses on how two large health systems in India--Gujarat and Tamil Nadu--have successfully applied human resources strategies in uniquely different contexts to the challenges of achieving Millennium Development Goal Five.

  5. Leveraging human capital to reduce maternal mortality in India: enhanced public health system or public-private partnership?

    Directory of Open Access Journals (Sweden)

    Madhivanan Purnima

    2009-02-01

    Full Text Available Abstract Developing countries are currently struggling to achieve the Millennium Development Goal Five of reducing maternal mortality by three quarters between 1990 and 2015. Many health systems are facing acute shortages of health workers needed to provide improved prenatal care, skilled birth attendance and emergency obstetric services – interventions crucial to reducing maternal death. The World Health Organization estimates a current deficit of almost 2.4 million doctors, nurses and midwives. Complicating matters further, health workforces are typically concentrated in large cities, while maternal mortality is generally higher in rural areas. Additionally, health care systems are faced with shortages of specialists such as anaesthesiologists, surgeons and obstetricians; a maldistribution of health care infrastructure; and imbalances between the public and private health care sectors. Increasingly, policy-makers have been turning to human resource strategies to cope with staff shortages. These include enhancement of existing work roles; substitution of one type of worker for another; delegation of functions up or down the traditional role ladder; innovation in designing new jobs;transfer or relocation of particular roles or services from one health care sector to another. Innovations have been funded through state investment, public-private partnerships and collaborations with nongovernmental organizations and quasi-governmental organizations such as the World Bank. This paper focuses on how two large health systems in India – Gujarat and Tamil Nadu – have successfully applied human resources strategies in uniquely different contexts to the challenges of achieving Millennium Development Goal Five.

  6. The Workplace Literacy System Project (WLS). Final Performance Report.

    Science.gov (United States)

    Poulton, Bruce R.

    The Workplace Literacy System Project (WLS) prepared interactive CD-ROM discs containing about 50 hours of instruction and drill in basic skills presented within the context of the textile/apparel manufacturing industry. The project was conducted at a Sara Lee knit products plant in North Carolina. During the project, literacy task analyses were…

  7. Cabo Verde - Private Sector Development

    Data.gov (United States)

    Millennium Challenge Corporation — The objective of the Private Sector Development Project activities of the 2005-2010 Cabo Verde Compact was to support Cabo Verde's long-term economic transformation...

  8. An Innovation Systems Assessment of the Australian Biofuel Industry. Policy and Private Sector Implications

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Jason D.

    2006-07-15

    A strong biofuel industry in Australia has the potential to provide numerous benefits to the nation and its peoples. The benefits include; reduced emissions of greenhouse gases and harmful particulate matter, a boost to rural development goals, enhanced fuel security and a lower balance of payments. For biofuels to be seriously considered as alternatives to traditional petroleum based automotive fuels they must be economically viable. The findings from a series of Australian Bureau of Agricultural and Resource Economics (ABARE) investigations suggest that ethanol and biodiesel production would be economically viable, in the Australian context, with oil prices in the range of 30-40 USD a barrel. Despite the price of oil being in or above this range for over two years a strong home grown biofuel industry has failed to develop in Australia. The purpose of this master's thesis therefore is to identify the critical issues facing biofuel industry development in Australian and to propose possible policy and private sector strategies for dealing with them. The analysis was done in the following three steps; the first was to map the development of the ethanol and biodiesel industries, the second was to analyse the performance of the industries overtime and the third was to identify the mechanisms which have either induced or blocked their growth. The strategies proposed by this thesis were derived from analysing the inducing and blocking mechanisms and the related issues. The innovation systems approach was chosen because of its ability to provide insights into key industry players, their network interactions and the institutional setup within which they work together to develop, diffuse and use their products. The data needed for the analysis stated above included information related to the development, diffusion and use of ethanol and biodiesel; that is, details about the industry actors and their activities, industry networks, product standards, excise arrangements

  9. An Innovation Systems Assessment of the Australian Biofuel Industry. Policy and Private Sector Implications

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Jason D

    2006-07-15

    A strong biofuel industry in Australia has the potential to provide numerous benefits to the nation and its peoples. The benefits include; reduced emissions of greenhouse gases and harmful particulate matter, a boost to rural development goals, enhanced fuel security and a lower balance of payments. For biofuels to be seriously considered as alternatives to traditional petroleum based automotive fuels they must be economically viable. The findings from a series of Australian Bureau of Agricultural and Resource Economics (ABARE) investigations suggest that ethanol and biodiesel production would be economically viable, in the Australian context, with oil prices in the range of 30-40 USD a barrel. Despite the price of oil being in or above this range for over two years a strong home grown biofuel industry has failed to develop in Australia. The purpose of this master's thesis therefore is to identify the critical issues facing biofuel industry development in Australian and to propose possible policy and private sector strategies for dealing with them. The analysis was done in the following three steps; the first was to map the development of the ethanol and biodiesel industries, the second was to analyse the performance of the industries overtime and the third was to identify the mechanisms which have either induced or blocked their growth. The strategies proposed by this thesis were derived from analysing the inducing and blocking mechanisms and the related issues. The innovation systems approach was chosen because of its ability to provide insights into key industry players, their network interactions and the institutional setup within which they work together to develop, diffuse and use their products. The data needed for the analysis stated above included information related to the development, diffusion and use of ethanol and biodiesel; that is, details about the industry actors and their activities, industry networks, product standards, excise arrangements

  10. An Innovation Systems Assessment of the Australian Biofuel Industry. Policy and Private Sector Implications

    International Nuclear Information System (INIS)

    Nielsen, Jason D.

    2006-07-01

    A strong biofuel industry in Australia has the potential to provide numerous benefits to the nation and its peoples. The benefits include; reduced emissions of greenhouse gases and harmful particulate matter, a boost to rural development goals, enhanced fuel security and a lower balance of payments. For biofuels to be seriously considered as alternatives to traditional petroleum based automotive fuels they must be economically viable. The findings from a series of Australian Bureau of Agricultural and Resource Economics (ABARE) investigations suggest that ethanol and biodiesel production would be economically viable, in the Australian context, with oil prices in the range of 30-40 USD a barrel. Despite the price of oil being in or above this range for over two years a strong home grown biofuel industry has failed to develop in Australia. The purpose of this master's thesis therefore is to identify the critical issues facing biofuel industry development in Australian and to propose possible policy and private sector strategies for dealing with them. The analysis was done in the following three steps; the first was to map the development of the ethanol and biodiesel industries, the second was to analyse the performance of the industries overtime and the third was to identify the mechanisms which have either induced or blocked their growth. The strategies proposed by this thesis were derived from analysing the inducing and blocking mechanisms and the related issues. The innovation systems approach was chosen because of its ability to provide insights into key industry players, their network interactions and the institutional setup within which they work together to develop, diffuse and use their products. The data needed for the analysis stated above included information related to the development, diffusion and use of ethanol and biodiesel; that is, details about the industry actors and their activities, industry networks, product standards, excise arrangements

  11. The role and uptake of private health insurance in different health care systems: are there lessons for developing countries?

    Science.gov (United States)

    Odeyemi, Isaac Ao; Nixon, John

    2013-01-01

    Social and national health insurance schemes are being introduced in many developing countries in moving towards universal health care. However, gaps in coverage are common and can only be met by out-of-pocket payments, general taxation, or private health insurance (PHI). This study provides an overview of PHI in different health care systems and discusses factors that affect its uptake and equity. A representative sample of countries was identified (United States, United Kingdom, The Netherlands, France, Australia, and Latvia) that illustrates the principal forms and roles of PHI. Literature describing each country's health care system was used to summarize how PHI is utilized and the factors that affect its uptake and equity. In the United States, PHI is a primary source of funding in conjunction with tax-based programs to support vulnerable groups; in the UK and Latvia, PHI is used in a supplementary role to universal tax-based systems; in France and Latvia, complementary PHI is utilized to cover gaps in public funding; in The Netherlands, PHI is supplementary to statutory private and social health insurance; in Australia, the government incentivizes the uptake of complementary PHI through tax rebates and penalties. The uptake of PHI is influenced by age, income, education, health care system typology, and the incentives or disincentives applied by governments. The effect on equity can either be positive or negative depending on the type of PHI adopted and its role within the wider health care system. PHI has many manifestations depending on the type of health care system used and its role within that system. This study has illustrated its common applications and the factors that affect its uptake and equity in different health care systems. The results are anticipated to be helpful in informing how developing countries may utilize PHI to meet the aim of achieving universal health care.

  12. Some controversy about law on private security

    Directory of Open Access Journals (Sweden)

    Stajić Ljubomir

    2014-01-01

    Full Text Available The Republic of Serbia is one of the last countries that legally regulate the private security sector, which is a new conceptual system of the national security system. Since the law is expected to solve many issues and dilemmas, and bring order to the area, which by some accounts is a very profitable branch of economy. Expectations were that by the end to regulate issues such as: 1 the need for institutionalization of partnership between the public and private sectors for mutual benefit, 2 the need of expressing mutual interest to establish the desired condition of security in the entire society and 3 the need to define the mechanisms and authority to achieve mentioned above. Based on this, legal framework of private security should explicitly provide: 1 a new role of the private sector, 2 communication and data exchange between the public and private sector, 3 mandatory notification about prepared or committed criminal acts on which there is information, 4 cooperation in the tasks of necessarily protected facilities, 4 cooperation in crisis situations including natural disasters, traffic accidents, strikes, sabotage, terrorist attacks, etc., 5 cooperate in the selection and training of staff and 6 cooperation in planning activities and project design of security. This paper presents a critical review of some theoretical and professional controversies in the solutions provided by law, for the purpose of answering whether it is achieving the purpose of passing of such a legal act.

  13. Collaboration and Virtualization in Large Information Systems Projects

    Directory of Open Access Journals (Sweden)

    Stefan Ioan NITCHI

    2009-01-01

    Full Text Available A project is evolving through different phases from idea and conception until the experiments, implementation and maintenance. The globalization, the Internet, the Web and the mobile computing changed many human activities, and in this respect, the realization of the Information System (IS projects. The projects are growing, the teams are geographically distributed, and the users are heterogeneous. In this respect, the realization of the large Information Technology (IT projects needs to use collaborative technologies. The distribution of the team, the users' heterogeneity and the project complexity determines the virtualization. This paper is an overview of these aspects for large IT projects. It shortly present a general framework developed by the authors for collaborative systems in general and adapted to collaborative project management. The general considerations are illustrated on the case of a large IT project in which the authors were involved.

  14. A planning and scheduling system for the LHC project

    CERN Document Server

    Bachy, Gérard; Tarrant, M

    1995-01-01

    The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...

  15. SE Capstone Project: Building Systems Engineering Education and Workforce Capacity

    Science.gov (United States)

    2012-04-01

    This project developed a system to improve fuel efficiency by means of regenerative braking . The team designed a simple system that allows "bolt-on...air traffic control, social networking, credit/debit cards, and anti-lock brakes are only a few functions enabled by complex systems of systems . We...Building Systems Engineering Education and Workforce Capacity SE Capstone Project APRIL 2012 Report Documentation Page Form ApprovedOMB No. 0704

  16. Comparing demographics, clinical presentation, treatments and outcome between systemic lupus erythematosus patients treated in a public and private health system in Santa Fe, Argentina.

    Science.gov (United States)

    Schmid, María Marcela; Roverano, Susana Graciela; Paira, Sergio Oscar

    2014-01-01

    The study includes 159 SLE patients seen between 1987 and 2011, of whom 116 were treated in the public health system and 43 in private practice. In the comparison between both groups, it was shown that patients in the public health system were younger at first consultation and at the onset of SLE, and that the mean duration of their disease prior to nephropathy was statistically significantly shorter. They also presented with more SLE activity (measured by Systemic Lupus Erythematosus Activity Index) such as fever, lower levels of C4, and elevated erythrocyte sedimentation rate. Although cyclophosphamide was administered more frequently to patients in the public health system group, there were no statistically significant differences in renal histological findings. A second renal biopsy was performed on 20 patients due to the presence of persistent proteinuria, peripheral edema, urinary casts, or because of previous defective renal specimens. The overall 10-year survival of the patients in the public health system was 78% compared to a survival rate of 91% for the patients in private practices. When survival was evaluated at 15 years, however, no differences were found (log rank test: 0.65). Patients from both public and private groups attended medical specialist practices and received early diagnoses and close follow-ups. Copyright © 2013 Elsevier España, S.L.U. All rights reserved.

  17. Identifying inaccuracy of MS Project using system analysis

    Science.gov (United States)

    Fachrurrazi; Husin, Saiful; Malahayati, Nurul; Irzaidi

    2018-05-01

    The problem encountered in project owner’s financial accounting report is the difference in total project costs of MS Project to the Indonesian Standard (Standard Indonesia Standard / Cost Estimating Standard Book of Indonesia). It is one of the MS Project problems concerning to its cost accuracy, so cost data cannot be used in an integrated way for all project components. This study focuses on finding the causes of inaccuracy of the MS Projects. The aim of this study, which is operationally, are: (i) identifying cost analysis procedures for both current methods (SNI) and MS Project; (ii) identifying cost bias in each element of the cost analysis procedure; and (iii) analysing the cost differences (cost bias) in each element to identify what the cause of inaccuracies in MS Project toward SNI is. The method in this study is comparing for both the system analysis of MS Project and SNI. The results are: (i) MS Project system in Work of Resources element has limitation for two decimal digits only, have led to its inaccuracy. Where the Work of Resources (referred to as effort) in MS Project represents multiplication between the Quantities of Activities and Requirements of resources in SNI; (ii) MS Project and SNI have differences in the costing methods (the cost estimation methods), in which the SNI uses the Quantity-Based Costing (QBC), meanwhile MS Project uses the Time-Based Costing (TBC). Based on this research, we recommend to the contractors who use SNI should make an adjustment for Work of Resources in MS Project (with correction index) so that it can be used in an integrated way to the project owner’s financial accounting system. Further research will conduct for improvement the MS Project as an integrated tool toward all part of the project participant.

  18. Career intentions of medical students in the setting of Nepal's rapidly expanding private medical education system.

    Science.gov (United States)

    Huntington, Ian; Shrestha, Suvash; Reich, Nicholas G; Hagopian, Amy

    2012-08-01

    The number of medical students trained in Nepal each year has increased nearly fifty-fold in the last 15 years, primarily through the creation of private medical schools. It is unknown where this expanding cohort of new physicians will ultimately practice. We distributed an anonymous survey to students in their last 2 years of medical school at four medical schools in Nepal to examine two dimensions of career intention: the intention to practice in Nepal and the intention to practice in rural areas. Eighty-five per cent of the eligible study population participated, for a total of 469 medical students. Of these, 88% thought it was likely they would practice in Nepal and 88% thought it likely they would practice in urban areas. Those students who indicated a greater likelihood of practicing abroad came from families with higher incomes, were more likely to think earning a good salary was very important to their decision to become a physician, and were less likely to think they could earn a good salary in Nepal. Students whose tuition was paid by the government were no more likely to indicate an intention to practice in Nepal than students paying their own tuition at private medical schools. Students who indicated a greater likelihood of practicing in rural areas were more likely to be male, to have gone to a government secondary school, to have been born in a village, or to have received a scholarship from the Ministry of Education that requires rural service. Based on our findings, we suggest the following policy changes: (1) medical schools consider selecting for students from rural backgrounds or government secondary schools who are more likely to intend to practice in rural areas, and (2) increase the number of post-graduate positions--weighted toward rural health needs--to retain students in Nepal.

  19. DEVELOPMENT OF INFORMATION SYSTEM STRATEGIES AND INFORMATION TECHNOLOGY AT PRIVATE UNIVERSITIES IN PRINGSEWU BY USING METHODOLOGY ENTERPRISE ARCHITECTURE PLANNING (EAP

    Directory of Open Access Journals (Sweden)

    Ahmad Khumaidi

    2017-08-01

    Full Text Available The development of information systems and information technology requires planning to complement the direction of the college strategy. Planning is constructed by defining data, application and technology architectures in the use of information to support business processes and then architectural design to identify needs and create architectural schemes and make plans for their implementation. Enterprise Architecture Planning (EAP is a method of data quality planning approach oriented to business needs and how the implementation of the architecture is done in such a way in an effort to support business turnover and achievement of Vision and Mission and the goal of strategic development of SI and IT at college private high. The result of this research is to get the blueprint resulting from Enterprise Architecture Planning (EAP methodology which will be used as a guide for making blueprint in the form of data architecture, application architecture and technology architecture in strategy development Information system and information technology as a whole on High private sector especially in Pringsewu

  20. Privatization costs

    International Nuclear Information System (INIS)

    Jackson, I.

    2007-01-01

    The efforts in progress now in Great Britain to liberalize the nuclear decommissioning activity market imply that by 2012 the competitive commercial private companies will lead the national nuclear decommissioning and decontamination related activity market. Paper dwells upon the new market peculiar features and upon some peculiar features of the new market related activities [ru

  1. Project BASIC: Building Art Systems into Curriculum.

    Science.gov (United States)

    Benson, Cal; Doane, Mitzi

    1982-01-01

    Describes Duluth, Minnesota's interdisciplinary program, Project BASIC, which incorporates five major art forms into the elementary curriculum. Schools employ artists-in-residence and in-service training to expand teacher use of arts in the classroom. Results of a research study to measure gains in self-concept and creativity are included. (AM)

  2. Generalized projective synchronization of a unified chaotic system

    International Nuclear Information System (INIS)

    Yan Jianping; Li Changpin

    2005-01-01

    In the present paper, a simple but efficient control technique of the generalized projective synchronization is applied to a unified chaotic system. Numerical simulations show that this method works very well, which can also be applied to other chaotic systems

  3. Sources of project financing in health care systems.

    Science.gov (United States)

    Smith, D G; Wheeler, J R; Rivenson, H L; Reiter, K L

    2000-01-01

    Through discussions with chief financial officers of leading health care systems, insights are offered on preferences for project financing and development efforts. Data from these same systems provide at least anecdotal evidence in support of pecking-order theory.

  4. A secure communication system using projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems

    International Nuclear Information System (INIS)

    Thang Manh Hoang; Nakagawa, Masahiro

    2008-01-01

    In this paper, a chaotic secure communication system is proposed by using the schemes of projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems and the modulation technique of synchronization-manifold shift keying. Further, the security of the proposed system is enhanced by using non-stationary dynamics in the master and/or non-stationary synchronization manifolds. The specific examples using modified Ikeda systems demonstrate and verify the effectiveness of the proposed system

  5. Project management system for the decommissioning of research reactors

    International Nuclear Information System (INIS)

    Park, J. H.

    2006-01-01

    KAERI has developed a computer information system, named DECOMMIS, for the project management with the increased effectiveness of the decommissioning projects and the record keeping for a next decommissioning project. The management system consists of three parts, code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites and the system can play roles of daily work reports to minimize the time gap between the dismantling activities and the evaluation of the data for project management. The DDPS provides useful information to the staff for more effective project management and this information include several fields, such as project progress management, man power management, waste management, radiation dose of workers and so on. It is expected that the system would enable to maintain the decommissioning data, to prepare the source data for the R and D for development of planning tools and to give information to the staff for the decision on the progress of the projects. In this paper, the overall system will be briefly explained and several examples of the utilization, focused on the waste and manpower control, for the project management will be introduced

  6. An Internet-Based Accounting Information Systems Project

    Science.gov (United States)

    Miller, Louise

    2012-01-01

    This paper describes a student project assignment used in an accounting information systems course. We are now truly immersed in the internet age, and while many required accounting information systems courses and textbooks introduce database design, accounting software development, cloud computing, and internet security, projects involving the…

  7. QFD Application to a Software - Intensive System Development Project

    Science.gov (United States)

    Tran, T. L.

    1996-01-01

    This paper describes the use of Quality Function Deployment (QFD), adapted to requirements engineering for a software-intensive system development project, and sysnthesizes the lessons learned from the application of QFD to the Network Control System (NCS) pre-project of the Deep Space Network.

  8. Advanced EVA Suit Camera System Development Project

    Science.gov (United States)

    Mock, Kyla

    2016-01-01

    The National Aeronautics and Space Administration (NASA) at the Johnson Space Center (JSC) is developing a new extra-vehicular activity (EVA) suit known as the Advanced EVA Z2 Suit. All of the improvements to the EVA Suit provide the opportunity to update the technology of the video imagery. My summer internship project involved improving the video streaming capabilities of the cameras that will be used on the Z2 Suit for data acquisition. To accomplish this, I familiarized myself with the architecture of the camera that is currently being tested to be able to make improvements on the design. Because there is a lot of benefit to saving space, power, and weight on the EVA suit, my job was to use Altium Design to start designing a much smaller and simplified interface board for the camera's microprocessor and external components. This involved checking datasheets of various components and checking signal connections to ensure that this architecture could be used for both the Z2 suit and potentially other future projects. The Orion spacecraft is a specific project that may benefit from this condensed camera interface design. The camera's physical placement on the suit also needed to be determined and tested so that image resolution can be maximized. Many of the options of the camera placement may be tested along with other future suit testing. There are multiple teams that work on different parts of the suit, so the camera's placement could directly affect their research or design. For this reason, a big part of my project was initiating contact with other branches and setting up multiple meetings to learn more about the pros and cons of the potential camera placements we are analyzing. Collaboration with the multiple teams working on the Advanced EVA Z2 Suit is absolutely necessary and these comparisons will be used as further progress is made for the overall suit design. This prototype will not be finished in time for the scheduled Z2 Suit testing, so my time was

  9. System Design and Engineering, lubricating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    This text book introduces systems engineering for designing systems in multidisciplinary projects. First an overview of the systems engineering process is given. Several systems thinking tracks are presented, to think about the system in a number of ways, its context, its user, its functionality,

  10. High frequency system project implementation plan

    International Nuclear Information System (INIS)

    Moon, L.L.

    1976-01-01

    The High Frequency System is a new mobile, digital diagnostic recording system for use at the Nevada Test Site. Many different kinds of event data will be digitized in real-time by this system, and these data will be recorded and stored for later read-out and transmission to NADCEN. The hardware and software requirements of the High Frequency System are examined, and the parameters of the system are proposed

  11. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  12. A project-based system for including farmers in the EU ETS

    DEFF Research Database (Denmark)

    Brandt, Urs Steiner; Svendsen, Gert Tinggaard

    2011-01-01

    as ‘the missing link’ in past climate negotiations. We argue that farmers have relatively low marginal reduction costs and that consequences in terms of the effect on permit price and technology are overall positive in the EU Emission Trading System (ETS). Thus, we propose a project-based system......Farmers in the EU do not trade greenhouse gases under the Kyoto agreement. This is an empirical puzzle because agriculture is a significant contributor of greenhouse gases (GHG) in the EU and may harvest private net gains from trade. Furthermore, the US has strongly advocated land-use practices...... for including the farming practices in the EU ETS that reduces the uncertainty from measuring emission reduction in this sector. The system encourages GHG reduction either by introducing a new and less polluting practice or by reducing the polluting activity. When doing so, farmers will receive GHG permits...

  13. Statement of work for the immobilized high-level waste transportation system, Project W-464

    Energy Technology Data Exchange (ETDEWEB)

    Mouette, P.

    1998-06-24

    The objective of this Statement of Work (SOW) is to present the scope, the deliverables, the organization, the technical and schedule expectations for the development of a Package Design Criteria (PDC), cost and schedule estimate for the acquisition of a transportation system for the Immobilized High-Level Waste (IHLW). This transportation system which includes the truck, the trailer, and a shielded cask will be used for on-site transportation of the IHLW canisters from the private vendor vitrification facility to the Hanford Site interim storage facility, i.e., vaults 2 and 3 of the Canister Storage Building (CSB). This Statement of Work asks Waste Management Federal Services, Inc., Northwest Operations, to provide Project W-464 with a Design Criteria Document, plus a life-cycle schedule and cost estimate for the acquisition of a transportation system (shielded cask, truck, trailer) for IHLW on-site transportation.

  14. A comparative cost analysis of picture archiving and communications systems (PACS versus conventional radiology in the private sector

    Directory of Open Access Journals (Sweden)

    Indres Moodley

    2015-03-01

    Aim: To undertake an incremental cost analysis of PACS compared with conventional radiology to determine productivity gains, if any, at two private hospitals in Durban. Method: An incremental cost analysis for chest radiographs, computed tomography and magnetic resonance imaging brain scans with and without contrast were performed. The overall incremental cost for PACS in comparison with a conventional radiology site was determined. The net present value was also determined to evaluate the capital budgeting requirements for both systems. Results: The incremental cost of both capital and the radiology information system for installing PACS shows an expected increase. The incremental PACS image cost shows a reduction. Conclusion: The study provides a benchmark for the cost incurred when implementing PACS. It also provides a decision framework for radiology departments that plan to introduce PACS and helps to determine the feasibility of its introduction.

  15. Optimized application of systems engineering to nuclear waste repository projects

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Shepard, M.

    1986-01-01

    The purpose of this presentation is to describe a fully optimized application of systems engineering methods and philosophy to the management of a large nuclear waste repository project. Knowledge gained from actual experience with the use of the systems approach on two repository projects is incorporated in the material presented. The projects are currently evaluating the isolation performance of different geologic settings and are in different phases of maturity. Systems engineering methods were applied by the principal author at the Waste Isolation Pilot Plant (WIPP) in the form of a functional analysis. At the Basalt Waste Isolation Project (BWIP), the authors assisted the intergrating contractor with the development and application of systems engineering methods. Based on this experience and that acquired from other waste management projects, an optimized plan for applying systems engineering techniques was developed. The plan encompasses the following aspects: project organization, developing and defining requirements, assigning work responsibilities, evaluating system performance, quality assurance, controlling changes, enhancing licensability, optimizing project performance, and addressing regulatory issues. This information is presented in the form of a roadmap for the practical application of system engineering principles to a nuclear waste repository project

  16. Rotavirus vaccines contribute towards universal health coverage in a mixed public-private healthcare system.

    Science.gov (United States)

    Loganathan, Tharani; Jit, Mark; Hutubessy, Raymond; Ng, Chiu-Wan; Lee, Way-Seah; Verguet, Stéphane

    2016-11-01

    To evaluate rotavirus vaccination in Malaysia from the household's perspective. The extended cost-effectiveness analysis (ECEA) framework quantifies the broader value of universal vaccination starting with non-health benefits such as financial risk protection and equity. These dimensions better enable decision-makers to evaluate policy on the public finance of health programmes. The incidence, health service utilisation and household expenditure related to rotavirus gastroenteritis according to national income quintiles were obtained from local data sources. Multiple birth cohorts were distributed into income quintiles and followed from birth over the first five years of life in a multicohort, static model. We found that the rich pay more out of pocket (OOP) than the poor, as the rich use more expensive private care. OOP payments among the poorest although small are high as a proportion of household income. Rotavirus vaccination results in substantial reduction in rotavirus episodes and expenditure and provides financial risk protection to all income groups. Poverty reduction benefits are concentrated amongst the poorest two income quintiles. We propose that universal vaccination complements health financing reforms in strengthening Universal Health Coverage (UHC). ECEA provides an important tool to understand the implications of vaccination for UHC, beyond traditional considerations of economic efficiency. © 2016 John Wiley & Sons Ltd.

  17. ANG coal gasification project management control system report. [Great Plains project

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  18. Integral indicator for evaluating system of material motivation employees of state and private enterprises in the construction sector

    Directory of Open Access Journals (Sweden)

    Zotkina Natalia

    2017-01-01

    Full Text Available The article is devoted to modeling mechanism for evaluation the labor contribution of Russian employees of public and private enterprises in the construction sector based on an analysis of current problems in the remuneration of the government. There was also taken into account the state of motivation system and job satisfaction of human resources in the executive authorities in the subject of Russian Federation (on an example of the Yamalo-Nenets Autonomous Okrug - YaNAO. The survey was dedicated to revealing preferences of civil servants in matters of career growth, professional development. On the basis of the quota survey of civil servants using absentee (dispenser survey, conducted in July-September 2015 in Yamalo-Nenets, the following conclusions were formulated. The study has found that enrollment in the personnel reserve is not an effective measure to motivate public servants since it functions mostly just formally. Of particular importance are such working conditions as “remuneration dependence on the actual results” and “Personal responsibility for specific areas of activity”, which is directly linked with the possibility to receive appropriate remuneration. Authors propose an integral indicator for assessing labor contribution of an employee of public and private enterprises of the construction sector in order to improve financial motivation and increase the level of interest, which is based on the principles of economic and mathematical modeling.

  19. Integration of health care organizations: using the power strategies of horizontal and vertical integration in public and private health systems.

    Science.gov (United States)

    Thaldorf, Carey; Liberman, Aaron

    2007-01-01

    Integration in health care attempts to provide all elements in a seamless continuum of care. Pressures influencing development of system-wide integration primarily come from unsustainable cost increases in the United States over the later part of the 20th century and the early 21st century. Promoters of health care integration assume that it will lead to increased effectiveness and quality of care while concurrently increasing cost-effectiveness and possibly facilitating cost savings. The primary focus of this literature review is on the Power Strategies of Horizontal and Vertical Integration. The material presented suggests that vertical integration is most effective in markets where the partners involved are larger and dominant in the regions they serve. The research has also found that integrating health care networks had little or no significant effect on improving overall organizational efficiencies or profits. Capital investment in information technologies still is cost prohibitive and outweighs its benefits to integration efficiencies in the private sector; however, there are some indications of improvements in publicly provided health care. Further research is needed to understand the reasons the public sector has had greater success in improving effectiveness and efficiency through integration than the private sector.

  20. PRIVATE SECURITY IN SPORT

    Directory of Open Access Journals (Sweden)

    Dragan Vukasović

    2011-09-01

    Full Text Available Given the importance of sport for international integration, affirmation, a sense of belonging and other values of general interest, in order to maintain and open new prospects of development, it is necessary to form the private security system along with state security system, with a view to creating conditions for development sports athletes to achieve better results both in domestic and international competitions. Private security is only one element of an integrated security system which, with its efficient organization with the use of adequate means and measures should provide answers to new challenges, risks and threats. Private security in line with the new understanding of the concept of security has an important role in providing athletes.

  1. Referral system in the Asir Region, Saudi Arabia: knowledge, attitude, and practice of physicians working in urban areas--a comparative study of governmental and private health sectors.

    Science.gov (United States)

    al-Erian, R A; Mahfouz, A A; Alakija, W; al-Khozayem, A A

    1994-01-01

    A comparative study of knowledge, attitude and practice regarding referral system was undertaken among all governmental primary health care and private dispensary physicians (56 and 50 respectively) in Abha and Kamis, Asir Region. Results show that knowledge about referral is adequate in both groups, but the attitudes and practice of both groups need to be positively modified specially among the private sector physicians. The paper recommends more orientation programs for both groups of physicians and urges the private sector physicians to be more involved in Ministry of Health training programs and activities. Cooperation in referral between the private sector and government hospitals is seen as one way of improving health care in Saudi Arabia.

  2. INSTITUTE OF THE STATE-PRIVATE PARTNERSHIP IN THE SPHERE OF THE STATE PURCHASES: PROBLEMS AND PROSPECTS OF DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    A. Sh. Subkhonberdiev

    2015-01-01

    Full Text Available Close cooperation between public and private property within the boundaries of a single firm (mixed company or within various forms of public-private partnerships is a characteristic tendency of modern innovative economy. The term covers a wide range of partnerships from simple contracts with private entrepreneurs in the production of goods, works, the provision of services to large projects needed in the areas where privatization is not possible, but there is a need in private investment. State, attracting private capital to financing of capital-intensive, long payback, but important for innovative economic development projects, does not lose control over them, and the private business gets access to previously closed sectors of the economy, such as transport infr astructure, housing and communal services, bringing with it new efficient technology management. Now there is no single approach to defining the nature and content of the concepts in the economic and legal literature presented different points of view, institutional problems of public-private partnership actively discussed by scientists and practitioners. Analysis of international experience projects shows that the specific features of and peculiarities of the institute of public-private partnership determined by the historical, social and economic characteristics development of each country. In turn, the institutional system public procurement is formed depending on the current in them budgetary and legislative system. Because of the historical development United States, perhaps on other developed countries advanced in the organization system of partnership between the state and private business, based solely on market principles.

  3. Study on the Cooperation Mechanism of Agricultural Land Consolidation Project Based on Public-Private Partnership%基于PPP模式的农地整理项目合作机理

    Institute of Scientific and Technical Information of China (English)

    吴九兴; 杨钢桥; 汪文雄

    2012-01-01

    采用比较分析法和规范分析法探究了公私合作(PPP)模式农地整理项目合作主体的职能分工、发起方式、资源整合和收益分配.结果表明,PPP模式农地整理项目的职能分工比传统模式更合理,有利于提高项目的效率;项目的发起方式与资源整合对项目的效率产生影响;收益分配结果取决于政府部门和私人部门各自对项目的贡献率.%Employing comparison and normative analysis, the function division of main cooperation bodies, the initiation means of projects, resources integration and benefits distribution in agricultural land consolidation projects based on public -private partnership (PPP) were explored. The results indicated that the functions division of PPP agricultural land consolidation projects was more reasonable than that of traditional mode, and could improve the efficiency of the projects. The launching ways and resources integration efforts in PPP agricultural land consolidation projects could affect the projects' investment efficiency. The outcomes of benefits allocation in PPP agricultural land consolidation projects was depended on the government and private sector's contribution to the project.

  4. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    Science.gov (United States)

    Lawrence N. Hudson; Joseph Wunderle M.; And Others

    2016-01-01

    The PREDICTS project—Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)—has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to...

  5. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    NARCIS (Netherlands)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara; Hill, Samantha L L; Lysenko, Igor; De Palma, Adriana; Phillips, Helen R P; Alhusseini, Tamera I; Bedford, Felicity E; Bennett, Dominic J; Booth, Hollie; Burton, Victoria J; Chng, Charlotte W T; Choimes, Argyrios; Correia, David L P; Day, Julie; Echeverría-Londoño, Susy; Emerson, Susan R; Gao, Di; Garon, Morgan; Harrison, Michelle L K; Ingram, Daniel J; Jung, Martin; Kemp, Victoria; Kirkpatrick, Lucinda; Martin, Callum D; Pan, Yuan; Pask-Hale, Gwilym D; Pynegar, Edwin L; Robinson, Alexandra N; Sanchez-Ortiz, Katia; Senior, Rebecca A; Simmons, Benno I; White, Hannah J; Zhang, Hanbin; Aben, Job; Abrahamczyk, Stefan; Adum, Gilbert B; Aguilar-Barquero, Virginia; Aizen, Marcelo A; Albertos, Belén; Alcala, E L; Del Mar Alguacil, Maria; Alignier, Audrey; Ancrenaz, Marc; Andersen, Alan N; Arbeláez-Cortés, Enrique; Armbrecht, Inge; Arroyo-Rodríguez, Víctor; Aumann, Tom; Axmacher, Jan C; Azhar, Badrul; Azpiroz, Adrián B; Baeten, Lander; Bakayoko, Adama; Báldi, András; Banks, John E; Baral, Sharad K; Barlow, Jos; Barratt, Barbara I P; Barrico, Lurdes; Bartolommei, Paola; Barton, Diane M; Basset, Yves; Batáry, Péter; Bates, Adam J; Baur, Bruno; Bayne, Erin M; Beja, Pedro; Benedick, Suzan; Berg, Åke; Bernard, Henry; Berry, Nicholas J; Bhatt, Dinesh; Bicknell, Jake E; Bihn, Jochen H; Blake, Robin J; Bobo, Kadiri S; Bóçon, Roberto; Boekhout, Teun; Böhning-Gaese, Katrin; Bonham, Kevin J; Borges, Paulo A V; Borges, Sérgio H; Boutin, Céline; Bouyer, Jérémy; Bragagnolo, Cibele; Brandt, Jodi S; Brearley, Francis Q; Brito, Isabel; Bros, Vicenç; Brunet, Jörg; Buczkowski, Grzegorz; Buddle, Christopher M; Bugter, Rob; Buscardo, Erika; Buse, Jörn; Cabra-García, Jimmy; Cáceres, Nilton C; Cagle, Nicolette L; Calviño-Cancela, María; Cameron, Sydney A; Cancello, Eliana M; Caparrós, Rut; Cardoso, Pedro; Carpenter, Dan; Carrijo, Tiago F; Carvalho, Anelena L; Cassano, Camila R; Castro, Helena; Castro-Luna, Alejandro A; Rolando, Cerda B; Cerezo, Alexis; Chapman, Kim Alan; Chauvat, Matthieu; Christensen, Morten; Clarke, Francis M; Cleary, Daniel F R; Colombo, Giorgio; Connop, Stuart P; Craig, Michael D; Cruz-López, Leopoldo; Cunningham, Saul A; D'Aniello, Biagio; D'Cruze, Neil; da Silva, Pedro Giovâni; Dallimer, Martin; Danquah, Emmanuel; Darvill, Ben; Dauber, Jens; Davis, Adrian L V; Dawson, Jeff; de Sassi, Claudio; de Thoisy, Benoit; Deheuvels, Olivier; Dejean, Alain; Devineau, Jean-Louis; Diekötter, Tim; Dolia, Jignasu V; Domínguez, Erwin; Dominguez-Haydar, Yamileth; Dorn, Silvia; Draper, Isabel; Dreber, Niels; Dumont, Bertrand; Dures, Simon G; Dynesius, Mats; Edenius, Lars; Eggleton, Paul; Eigenbrod, Felix; Elek, Zoltán; Entling, Martin H; Esler, Karen J; de Lima, Ricardo F; Faruk, Aisyah; Farwig, Nina; Fayle, Tom M; Felicioli, Antonio; Felton, Annika M; Fensham, Roderick J; Fernandez, Ignacio C; Ferreira, Catarina C; Ficetola, Gentile F; Fiera, Cristina; Filgueiras, Bruno K C; Fırıncıoğlu, Hüseyin K; Flaspohler, David; Floren, Andreas; Fonte, Steven J; Fournier, Anne; Fowler, Robert E; Franzén, Markus; Fraser, Lauchlan H; Fredriksson, Gabriella M; Freire, Geraldo B; Frizzo, Tiago L M; Fukuda, Daisuke; Furlani, Dario; Gaigher, René; Ganzhorn, Jörg U; García, Karla P; Garcia-R, Juan C; Garden, Jenni G; Garilleti, Ricardo; Ge, Bao-Ming; Gendreau-Berthiaume, Benoit; Gerard, Philippa J; Gheler-Costa, Carla; Gilbert, Benjamin; Giordani, Paolo; Giordano, Simonetta; Golodets, Carly; Gomes, Laurens G L; Gould, Rachelle K; Goulson, Dave; Gove, Aaron D; Granjon, Laurent; Grass, Ingo; Gray, Claudia L; Grogan, James; Gu, Weibin; Guardiola, Moisès; Gunawardene, Nihara R; Gutierrez, Alvaro G; Gutiérrez-Lamus, Doris L; Haarmeyer, Daniela H; Hanley, Mick E; Hanson, Thor; Hashim, Nor R; Hassan, Shombe N; Hatfield, Richard G; Hawes, Joseph E; Hayward, Matt W; Hébert, Christian; Helden, Alvin J; Henden, John-André; Henschel, Philipp; Hernández, Lionel; Herrera, James P; Herrmann, Farina; Herzog, Felix; Higuera-Diaz, Diego; Hilje, Branko; Höfer, Hubert; Hoffmann, Anke; Horgan, Finbarr G; Hornung, Elisabeth; Horváth, Roland; Hylander, Kristoffer; Isaacs-Cubides, Paola; Ishida, Hiroaki; Ishitani, Masahiro; Jacobs, Carmen T; Jaramillo, Víctor J; Jauker, Birgit; Hernández, F Jiménez; Johnson, McKenzie F; Jolli, Virat; Jonsell, Mats; Juliani, S Nur; Jung, Thomas S; Kapoor, Vena; Kappes, Heike; Kati, Vassiliki; Katovai, Eric; Kellner, Klaus; Kessler, Michael; Kirby, Kathryn R; Kittle, Andrew M; Knight, Mairi E; Knop, Eva; Kohler, Florian; Koivula, Matti; Kolb, Annette; Kone, Mouhamadou; Kőrösi, Ádám; Krauss, Jochen; Kumar, Ajith; Kumar, Raman; Kurz, David J; Kutt, Alex S; Lachat, Thibault; Lantschner, Victoria; Lara, Francisco; Lasky, Jesse R; Latta, Steven C; Laurance, William F; Lavelle, Patrick; Le Féon, Violette; LeBuhn, Gretchen; Légaré, Jean-Philippe; Lehouck, Valérie; Lencinas, María V; Lentini, Pia E; Letcher, Susan G; Li, Qi; Litchwark, Simon A; Littlewood, Nick A; Liu, Yunhui; Lo-Man-Hung, Nancy; López-Quintero, Carlos A; Louhaichi, Mounir; Lövei, Gabor L; Lucas-Borja, Manuel Esteban; Luja, Victor H; Luskin, Matthew S; MacSwiney G, M Cristina; Maeto, Kaoru; Magura, Tibor; Mallari, Neil Aldrin; Malone, Louise A; Malonza, Patrick K; Malumbres-Olarte, Jagoba; Mandujano, Salvador; Måren, Inger E; Marin-Spiotta, Erika; Marsh, Charles J; Marshall, E J P; Martínez, Eliana; Martínez Pastur, Guillermo; Moreno Mateos, David; Mayfield, Margaret M; Mazimpaka, Vicente; McCarthy, Jennifer L; McCarthy, Kyle P; McFrederick, Quinn S; McNamara, Sean; Medina, Nagore G; Medina, Rafael; Mena, Jose L; Mico, Estefania; Mikusinski, Grzegorz; Milder, Jeffrey C; Miller, James R; Miranda-Esquivel, Daniel R; Moir, Melinda L; Morales, Carolina L; Muchane, Mary N; Muchane, Muchai; Mudri-Stojnic, Sonja; Munira, A Nur; Muoñz-Alonso, Antonio; Munyekenye, B F; Naidoo, Robin; Naithani, A; Nakagawa, Michiko; Nakamura, Akihiro; Nakashima, Yoshihiro; Naoe, Shoji; Nates-Parra, Guiomar; Navarrete Gutierrez, Dario A; Navarro-Iriarte, Luis; Ndang'ang'a, Paul K; Neuschulz, Eike L; Ngai, Jacqueline T; Nicolas, Violaine; Nilsson, Sven G; Noreika, Norbertas; Norfolk, Olivia; Noriega, Jorge Ari; Norton, David A; Nöske, Nicole M; Nowakowski, A Justin; Numa, Catherine; O'Dea, Niall; O'Farrell, Patrick J; Oduro, William; Oertli, Sabine; Ofori-Boateng, Caleb; Oke, Christopher Omamoke; Oostra, Vicencio; Osgathorpe, Lynne M; Otavo, Samuel Eduardo; Page, Navendu V; Paritsis, Juan; Parra-H, Alejandro; Parry, Luke; Pe'er, Guy; Pearman, Peter B; Pelegrin, Nicolás; Pélissier, Raphaël; Peres, Carlos A; Peri, Pablo L; Persson, Anna S; Petanidou, Theodora; Peters, Marcell K; Pethiyagoda, Rohan S; Phalan, Ben; Philips, T Keith; Pillsbury, Finn C; Pincheira-Ulbrich, Jimmy; Pineda, Eduardo; Pino, Joan; Pizarro-Araya, Jaime; Plumptre, A J; Poggio, Santiago L; Politi, Natalia; Pons, Pere; Poveda, Katja; Power, Eileen F; Presley, Steven J; Proença, Vânia; Quaranta, Marino; Quintero, Carolina; Rader, Romina; Ramesh, B R; Ramirez-Pinilla, Martha P; Ranganathan, Jai; Rasmussen, Claus; Redpath-Downing, Nicola A; Reid, J Leighton; Reis, Yana T; Rey Benayas, José M; Rey-Velasco, Juan Carlos; Reynolds, Chevonne; Ribeiro, Danilo Bandini; Richards, Miriam H; Richardson, Barbara A; Richardson, Michael J; Ríos, Rodrigo Macip; Robinson, Richard; Robles, Carolina A; Römbke, Jörg; Romero-Duque, Luz Piedad; Rös, Matthias; Rosselli, Loreta; Rossiter, Stephen J; Roth, Dana S; Roulston, T'ai H; Rousseau, Laurent; Rubio, André V; Ruel, Jean-Claude; Sadler, Jonathan P; Sáfián, Szabolcs; Saldaña-Vázquez, Romeo A; Sam, Katerina; Samnegård, Ulrika; Santana, Joana; Santos, Xavier; Savage, Jade; Schellhorn, Nancy A; Schilthuizen, Menno; Schmiedel, Ute; Schmitt, Christine B; Schon, Nicole L; Schüepp, Christof; Schumann, Katharina; Schweiger, Oliver; Scott, Dawn M; Scott, Kenneth A; Sedlock, Jodi L; Seefeldt, Steven S; Shahabuddin, Ghazala; Shannon, Graeme; Sheil, Douglas; Sheldon, Frederick H; Shochat, Eyal; Siebert, Stefan J; Silva, Fernando A B; Simonetti, Javier A; Slade, Eleanor M; Smith, Jo; Smith-Pardo, Allan H; Sodhi, Navjot S; Somarriba, Eduardo J; Sosa, Ramón A; Soto Quiroga, Grimaldo; St-Laurent, Martin-Hugues; Starzomski, Brian M; Stefanescu, Constanti; Steffan-Dewenter, Ingolf; Stouffer, Philip C; Stout, Jane C; Strauch, Ayron M; Struebig, Matthew J; Su, Zhimin; Suarez-Rubio, Marcela; Sugiura, Shinji; Summerville, Keith S; Sung, Yik-Hei; Sutrisno, Hari; Svenning, Jens-Christian; Teder, Tiit; Threlfall, Caragh G; Tiitsaar, Anu; Todd, Jacqui H; Tonietto, Rebecca K; Torre, Ignasi; Tóthmérész, Béla; Tscharntke, Teja; Turner, Edgar C; Tylianakis, Jason M; Uehara-Prado, Marcio; Urbina-Cardona, Nicolas; Vallan, Denis; Vanbergen, Adam J; Vasconcelos, Heraldo L; Vassilev, Kiril; Verboven, Hans A F; Verdasca, Maria João; Verdú, José R; Vergara, Carlos H; Vergara, Pablo M; Verhulst, Jort; Virgilio, Massimiliano; Vu, Lien Van; Waite, Edward M; Walker, Tony R; Wang, Hua-Feng; Wang, Yanping; Watling, James I; Weller, Britta; Wells, Konstans; Westphal, Catrin; Wiafe, Edward D; Williams, Christopher D; Willig, Michael R; Woinarski, John C Z; Wolf, Jan H D; Wolters, Volkmar; Woodcock, Ben A; Wu, Jihua; Wunderle, Joseph M; Yamaura, Yuichi; Yoshikura, Satoko; Yu, Douglas W; Zaitsev, Andrey S; Zeidler, Juliane; Zou, Fasheng; Collen, Ben; Ewers, Rob M; Mace, Georgina M; Purves, Drew W; Scharlemann, Jörn P W; Purvis, Andy

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of

  6. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    DEFF Research Database (Denmark)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara

    2017-01-01

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity ...

  7. Projective synchronization of chaotic systems with bidirectional ...

    Indian Academy of Sciences (India)

    2Department of Applied Mathematics, University of Calcutta, 92, A.P.C. Road,. Kolkata 700 009, India. ∗ ... versal phenomenon in a variety of natural and engineering systems [4]. Over the past two decades ..... Now, following the rule for the construction of master–slave system, we obtain the master system as. ˙x1 = x2 + ...

  8. Nuclear privatization

    International Nuclear Information System (INIS)

    Jeffs, E.

    1995-01-01

    The United Kingdom government announced in May 1995 plans to privatize the country's two nuclear generating companies, Nuclear Electric and Scottish Nuclear. Under the plan, the two companies will become operating divisions of a unified holding company, to be called British Electric, with headquarters in Scotland. Britain's nuclear plants were left out of the initial privatization in 1989 because the government believed the financial community would be unwilling to accept the open-ended liability of decommissioning the original nine stations based on the Magnox gas-cooled reactor. Six years later, the government has found a way around this by retaining these power stations in state ownership, leaving the new nuclear company with the eight Advanced Gas-cooled Reactor (AGR) stations and the recently completed Sizewell B PWR stations. The operating Magnox stations are to be transferred to BNFL, which operates two Magnox stations of their own at Calder Hall and Chapelcross

  9. Private law

    DEFF Research Database (Denmark)

    working and researching in the key areas of law, security and privacy in IT, international trade and private law. Now, in 2010 and some seven conferences later, the event moves to Barcelona and embraces for the first time the three conference tracks just described. The papers in this work have all been...... blind reviewed and edited for quality. They represent the contributions of leading academics, early career researchers and others from an increasing number of countries, universities and institutions around the world. They set a benchmark for discussion of the current issues arising in the subject area...... and continue to offer an informed and relevant contribution to the policy making agenda. As Chair of the Conference Committee, I am once more very proud to endorse this work "Private Law: Rights, Duties & Conflicts" to all those seeking an up to date and informed evaluation of the leading issues. This work...

  10. System supplier approach to projects and operations efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Moe, P O [Siemens Offshore A/S (Norway)

    1994-12-31

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs.

  11. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  12. I and C systems refurbishment projects for plant life extension

    International Nuclear Information System (INIS)

    Andrashov, A.A.; Sklyar, V.V.; Siora, A.A.

    2012-01-01

    This paper describes the approach to implementation of Nuclear Power Plants (NPPs) Instrumentation and Control (I and C) systems refurbishment projects using Field Programmable Gate Array (FPGA)-based platform. The analysis identifying advantages of refurbishment projects for NPPs is performed. The main goals of the utilities with respect to refurbishment of NPPs I and C systems are outlined. The advantages of FPGA technology application for NPP I and C systems are described. Regulatory framework of FPGA technology for NPPs I and C systems is presented. General principles which may be used for implementation of NPPs I and C system refurbishment projects are presented. The experience of Research and Production Corporation (RPC) Radiy in implementation of NPPs I and C system refurbishment projects is considered. (author)

  13. Controlled cooling of an electronic system based on projected conditions

    Science.gov (United States)

    David, Milnes P.; Iyengar, Madhusudan K.; Schmidt, Roger R.

    2015-08-18

    Energy efficient control of a cooling system cooling an electronic system is provided based, in part, on projected conditions. The control includes automatically determining an adjusted control setting(s) for an adjustable cooling component(s) of the cooling system. The automatically determining is based, at least in part, on projected power consumed by the electronic system at a future time and projected temperature at the future time of a heat sink to which heat extracted is rejected. The automatically determining operates to reduce power consumption of the cooling system and/or the electronic system while ensuring that at least one targeted temperature associated with the cooling system or the electronic system is within a desired range. The automatically determining may be based, at least in part, on an experimentally obtained model(s) relating the targeted temperature and power consumption of the adjustable cooling component(s) of the cooling system.

  14. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  15. NASA UAS Integration into the NAS Project: Human Systems Integration

    Science.gov (United States)

    Shively, Jay

    2016-01-01

    This presentation provides an overview of the work the Human Systems Integration (HSI) sub-project has done on detect and avoid (DAA) displays while working on the UAS (Unmanned Aircraft System) Integration into the NAS project. The most recent simulation on DAA interoperability with Traffic Collision Avoidance System (TCAS) is discussed in the most detail. The relationship of the work to the larger UAS community and next steps are also detailed.

  16. Controlling general projective synchronization of fractional order Rossler systems

    International Nuclear Information System (INIS)

    Shao Shiquan

    2009-01-01

    This paper proposed a method to achieve general projective synchronization of two fractional order Rossler systems. First, we construct the fractional order Rossler system's corresponding approximation integer order system. Then, a control method based on a partially linear decomposition and negative feedback of state errors was utilized on the integer order system. Numerical simulations show the effectiveness of the proposed method.

  17. DOE Heat Pump Centered Integrated Community Energy Systems Project

    Energy Technology Data Exchange (ETDEWEB)

    Calm, J. M.

    1979-01-01

    The Heat Pump Centered Integrated Community Energy Systems (HP-ICES) Project is a multiphase undertaking seeking to demonstrate one or more operational HP-ICES by the end of 1983. The seven phases include System Development, Demonstration Design, Design Completion, HP-ICES Construction, Operation and Data Acquisition, HP-ICES Evaluation, and Upgraded Continuation. This project is sponsored by the Community Systems Branch, Office of Buildings and Community Systems, Assistant Secretary for Conservation and Solar Applicaions, U.S. Department of Energy (DOE). It is part of the Community Systems Program and is managed by the Energy and Environmental Systems Division of Argonne Natinal Laboratory.

  18. Establishment and preliminary application of the interactive tele-radiologic conference system based on virtual private network

    International Nuclear Information System (INIS)

    Wang Xuejian; Hu Jian; Wang Kang; Yu Hui; Luo Min; Lei Wenyong

    2005-01-01

    Objective: To investigate the establishment and characteristics of the interactive tele-radiological system (IATRS). Methods: Local area network (LAN) of local hospitals with firewall and ADSL Modem was connected into internet, then connected into the Virtual Private Network (VPN) server of the affiliated hospital of Guiyang Medical College (GMCAH) through anti-firewall of GMCAH. The VPN tunnel was acquired and LAN of local hospitals was connected into the PACS server of GMCAH, resulting in sharing of radiological data by both the GMCAH and local hospitals. Results: Radiological data from local hospitals could be transmitted by the PACS server of GMCAH safety and rapidly. The IATRS could provide high-quality images with high-speed, and with ease to perform. Conclusion: IATRS is useful and reliable for transmitting radiological data between remote places. (authors)

  19. Complex governance system issues for transportation renewal projects

    Directory of Open Access Journals (Sweden)

    Kelly Strong

    2014-01-01

    Full Text Available The use of public–private partnerships (PPPs is growing in the United States in response to reductions in funding combined with an aging highway transportation infrastructure. Many other countries have longer experience with PPP and a greater understanding of the issues surrounding their use. The main governance issues to be addressed in PPPs deal with risk-sharing, relationships, contracts, and legal framework, and standard processes within dedicated organizational units. These governance issues are examined in the context of a case study for the US 36 Phase II PPP in Colorado. Findings suggest that for the US Phase II project, governance issues are resolved through more relational forms than prescriptive contractual language. Colorado has established a dedicated organizational unit to facilitate the use of PPPs, but there exist no standards or best practices in the United States for procurement, concession terms, or risk-sharing.

  20. Integrated project management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-01-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK)

  1. Integrated project management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-03-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK).

  2. Direct costs of dengue hospitalization in Brazil: public and private health care systems and use of WHO guidelines.

    Science.gov (United States)

    Vieira Machado, Alessandra A; Estevan, Anderson Oliveira; Sales, Antonio; Brabes, Kelly Cristina da Silva; Croda, Júlio; Negrão, Fábio Juliano

    2014-09-01

    Dengue, an arboviral disease, is a public health problem in tropical and subtropical regions worldwide. In Brazil, epidemics have become increasingly important, with increases in the number of hospitalizations and the costs associated with the disease. This study aimed to describe the direct costs of hospitalized dengue cases, the financial impact of admissions and the use of blood products where current protocols for disease management were not followed. To analyze the direct costs of dengue illness and platelet transfusion in Brazil based on the World Health Organization (WHO) guidelines, we conducted a retrospective cross-sectional census study on hospitalized dengue patients in the public and private Brazilian health systems in Dourados City, Mato Grosso do Sul State, Brazil. The analysis involved cases that occurred from January through December during the 2010 outbreak. In total, we examined 8,226 mandatorily reported suspected dengue cases involving 507 hospitalized patients. The final sample comprised 288 laboratory-confirmed dengue patients, who accounted for 56.8% of all hospitalized cases. The overall cost of the hospitalized dengue cases was US $210,084.30, in 2010, which corresponded to 2.5% of the gross domestic product per capita in Dourados that year. In 35.2% of cases, blood products were used in patients who did not meet the blood transfusion criteria. The overall median hospitalization cost was higher (p = 0.002) in the group that received blood products (US $1,622.40) compared with the group that did not receive blood products (US $550.20). The comparative costs between the public and the private health systems show that both the hospitalization of and platelet transfusion in patients who do not meet the WHO and Brazilian dengue guidelines increase the direct costs, but not the quality, of health care.

  3. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  4. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  5. Data Management System of the DIRAC Project

    CERN Multimedia

    Haen, Christophe; Tsaregorodtsev, Andrei

    2015-01-01

    The DIRAC Interware provides a development framework and a complete set of components for building distributed computing systems. The DIRAC Data Management System (DMS) offers all the necessary tools to ensure data handling operations for small and large user communities. It supports transparent access to storage resources based on multiple technologies, and is easily expandable. The information on data files and replicas is kept in a File Catalog of which DIRAC offers a powerful and versatile implementation (DFC). Data movement can be performed using third party services including FTS3. Bulk data operations are resilient with respect to failures due to the use of the Request Management System (RMS) that keeps track of ongoing tasks. In this contribution we will present an overview of the DIRAC DMS capabilities and its connection with other DIRAC subsystems such as the Transformation System. The DIRAC DMS is in use by several user communities now. The contribution will present the experience of the LHCb exper...

  6. Projective and hybrid projective synchronization for the Lorenz-Stenflo system with estimation of unknown parameters

    International Nuclear Information System (INIS)

    Mukherjee, Payel; Banerjee, Santo

    2010-01-01

    In this work, in the first phase, we study the phenomenon of projective synchronization in the Lorenz-Stenflo system. Synchronization is then investigated for the same system with unknown parameters. We show analytically that synchronization is possible for some proper choice of the nonlinear controller by using a suitable Lyapunov function. With the help of this result, it is also possible to estimate the values of the unknown system parameters. In the second phase as an extension of our analysis, we investigate the new hybrid projective synchronization for the same system. All our analyses are well supported with numerical evidence.

  7. SGDes project. Decommissioning management system of Enresa

    International Nuclear Information System (INIS)

    Fernandez Lopez, M.; Julian, A. de

    2013-01-01

    ENRESA, the public company responsible for managing radioactive waste produced in spain and nuclear facilities decommissioning work, has developed a management information system (SGDes) for the decommissioning of nuclear power plants, critical for the company. SGDes system is capable of responding to operational needs for efficient, controlled and secure way. Dismantling activities require a rigorous operations control within highly specialized, process systematization and safety framework, both the human and technological point of view. (Author)

  8. Evaluating and projecting the European security system

    International Nuclear Information System (INIS)

    Dean, J.

    1991-01-01

    Components of the new European security system are described taking into account the new policy making and possibilities to resolve conflicts. Programmes for political and economic integration and co-operation managed by the European Community will provide main positive content of the new European security system. An insight of the future of nuclear armaments in Europe is included together with confidence building measure and the role of NATO

  9. Advanced Ground Systems Maintenance Physics Models For Diagnostics Project

    Science.gov (United States)

    Perotti, Jose M.

    2015-01-01

    The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations. This project will develop and implement high-fidelity physics-based modeling techniques tosimulate the real-time operation of cryogenics and other fluids systems and, when compared to thereal-time operation of the actual systems, provide assessment of their state. Physics-modelcalculated measurements (called “pseudo-sensors”) will be compared to the system real-timedata. Comparison results will be utilized to provide systems operators with enhanced monitoring ofsystems' health and status, identify off-nominal trends and diagnose system/component failures.This capability can also be used to conduct planning and analysis of cryogenics and other fluidsystems designs. This capability will be interfaced with the ground operations command andcontrol system as a part of the Advanced Ground Systems Maintenance (AGSM) project to helpassure system availability and mission success. The initial capability will be developed for theLiquid Oxygen (LO2) ground loading systems.

  10. Full state hybrid projective synchronization in hyperchaotic systems

    International Nuclear Information System (INIS)

    Chu Yandong; Chang Yingxiang; Zhang Jiangang; Li Xianfeng; An Xinlei

    2009-01-01

    In this letter, we investigate the full state hybrid projective synchronization (FSHPS) which includes complete synchronization, anti-synchronization and projective synchronization as its special items. Based on Lyapunov stability theory a controller can be designed for achieving the FSHPS of hyperchaotic systems. Numerical simulations are provided to verify the effectiveness of the proposed scheme.

  11. Boundary Spanning in Offshored Information Systems Development Projects

    Science.gov (United States)

    Krishnan, Poornima

    2010-01-01

    Recent growth in offshore outsourcing of information systems (IS) services is accompanied by managing the offshore projects successfully. Much of the project failures can be attributed to geographic and organizational boundaries which create differences in culture, language, work patterns, and decision making processes among the offshore project…

  12. The Food Early Warning System Project in Somalia

    Directory of Open Access Journals (Sweden)

    Leblanc, M.

    1992-01-01

    Full Text Available The article describes shortly the objectives of a Food Early Warning System (FEWS project, as well as its organisation. The specifie case of Somalia, where the project had to evolve in increasingly difficult situations, and the solutions used so as to preserve the output, are described.

  13. A Role for Soft Systems Methodology in ELT Projects.

    Science.gov (United States)

    Holliday, Adrian

    1990-01-01

    Discusses the uses for soft systems methodology (SSM) in English language training (ELT) projects. It is suggested that ethnographic techniques may help in achieving the understanding needed to start an ELT project while SSM may provide a useful means for structuring ethnographic findings. (Author/VWL)

  14. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  15. Public and Private Sectors in Asian Higher Education Systems: Issues and Prospects. Reports from the International Seminar on Higher Education in Asia (3rd, Hiroshima, Japan, 1987).

    Science.gov (United States)

    Hiroshima Univ. (Japan). Research Inst. for Higher Education.

    The roles of public and private sectors of higher education in Asia and relationships to national systems are explored in reports from the Third International Seminar on Higher Education in Asia. The focus was China, Indonesia, Korea, the Philippines, Japan, and Thailand. Patterns by which national systems of higher education are differentiated…

  16. Relationships of work characteristics to job satisfaction, turnover intention, and burnout among doctors in the district public-private mixed health system of Bangladesh.

    Science.gov (United States)

    Roy, Ashim; van der Weijden, Trudy; de Vries, Nanne

    2017-06-20

    Work design integrates work characteristics having organizational, social and job components which influence employees' welfare and also organizational goals. We investigated the effects of work characteristics and other predictors to job satisfaction, turnover intention, and burnout in doctors of the public primary, public secondary and private facilities of the district health system of Bangladesh. A quantitative study using a self-administered questionnaire containing mostly structured items was conducted among the public and private doctors with a sample size of 384 from 29 out of a total 64 districts of Bangladesh during October and November 2015. All variables including work characteristics and outcomes of interest were based on literature and measured on 5-point Likert scale. Multivariate analysis of variance, bivariate correlation, and multiple regression were the models operated through SPSS version-21. A total of 354 doctors responded. No significant differences were found between public primary and secondary level doctors on combined work characteristics and outcomes variables, which however differed significantly between the public and private doctors. Organizational support was the strongest predictor adversely affecting job satisfaction, turnover intention and burnout of both the public and private doctors; private doctors' experienced more support. The effects of health-professional politics on the public doctors were alarming. Work design of the Bangladesh's health system is in need of ample development. Doing so, improvement in organizational supports is crucial; however, other work characteristics components are also important for enhancing doctors' welfare and health system productivity.

  17. Residential on site solar heating systems: a project evaluation using the capital asset pricing model

    Energy Technology Data Exchange (ETDEWEB)

    Schutz, S.R.

    1978-12-01

    An energy source ready for immediate use on a commercial scale is solar energy in the form of On Site Solar Heating (OSSH) systems. These systems collect solar energy with rooftop panels, store excess energy in water storage tanks and can, in certain circumstances, provide 100% of the space heating and hot water required by the occupants of the residential or commercial structure on which the system is located. Such systems would take advantage of a free and inexhaustible energy source--sunlight. The principal drawback of such systems is the high initial capital cost. The solution would normally be a carefully worked out corporate financing plan. However, at the moment it is individual homeowners and not corporations who are attempting to finance these systems. As a result, the terms of finance are excessively stringent and constitute the main obstacle to the large scale market penetration of OSSH. This study analyzes the feasibility of OSSH as a private utility investment. Such systems would be installed and owned by private utilities and would displace other investment projects, principally electric generating plants. The return on OSSH is calculated on the basis of the cost to the consumer of the equivalent amount of electrical energy that is displaced by the OSSH system. The hurdle rate for investment in OSSH is calculated using the Sharpe--Lintner Capital Asset Pricing Model. The results of this study indicate that OSSH is a low risk investment having an appropriate hurdle rate of 7.9%. At this rate, OSSH investment appears marginally acceptable in northern California and unambiguously acceptable in southern California. The results also suggest that utility investment in OSSH should lead to a higher degree of financial leverage for utility companies without a concurrent deterioration in the risk class of utility equity.

  18. Control system of the MACSE project

    International Nuclear Information System (INIS)

    Gournay, J.F.; Gougnaud, F.; Matichard, G.; Azoulay, R.; Bouillac, A.

    1991-01-01

    With the goal of investigating all the technological aspects of superconducting RF acceleration, the so-called MACSE facility was put in operation at the end of 1990. The control system is built with several VME crates linked together with a dedicated Ethernet network. VxWorks is the real-time operating system used. A set of software services was built on top of VxWorks (high level communication tools, a data-base management system, a library of VME boards drivers and a limited man-machine interface). A complete range of application programs have been developed with these tools in order to fulfill the requirements of such a facility (settings of the parameters, surveillance, archive facility, closed loops...). The TCP-IP protocols family is extensively used for communications between the components of the system (UDP, RPC, rcmd, NFS). The development environment is based on the host-target approach through the use of a network of Sun 3/80 workstations. After 1 1/2 year of experience, this system has proven to be powerful and flexible [fr

  19. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  20. Project Specific Quality Assurance Plan Project (QAPP) W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    HALL, L.R.

    2000-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Project Hanford Quality Assurance Program is implemented by CH2M HILL Hanford Group Inc (CHG) for managing the Initial Tank Retrieval Systems (ITRS), Project W-211. This QAPP is responsive to the CHG Quality Assurance Program Description (QAPD) (LMH-MP-599) which provides direction for compliance to 10 CFR 830 120, ''Nuclear Safety Management, Quality Assurance Requirements'', and DOE Order 5700 6C, ''Quality Assurance'' Project W-211 modifies existing facilities and provides systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. This project includes the design, procurement, construction, startup and turnover of these retrieval systems This QAPP identifies organizational structures and responsibilities. Implementing procedures used by CHG project management can be found in the CHG Quality Assurance Program (CHG QAP) Implementation Matrix located in HNF-IP-0842, Volume XI, Attachment Proposed verification and inspection activities for critical items within the scope of project W-211 are identified in Attachment 1 W-211. Project participants will identify the implementing procedures used by their organization within their QAF'Ps. This project specific QAPP is used to identify requirements in addition to the QAPD and provide, by reference, additional information to other project documents

  1. The Fox Project: Advanced Development of Systems Software

    National Research Council Canada - National Science Library

    1999-01-01

    The long-term objectives of the Carnegie Mellon Fox Project are to improve the design and construction of systems software and to further the development of advanced programming language technology...

  2. The Fox Project: Advanced Development of Systems Software

    National Research Council Canada - National Science Library

    2000-01-01

    The long-term objectives of the Carnegie Mellon Fox Project are to improve the design and construction of systems software and to further the development of advanced programming language technology...

  3. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  4. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  5. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  6. Project W-058 monitor and control system logic

    International Nuclear Information System (INIS)

    ROBERTS, J.B.

    1999-01-01

    This supporting document contains the printout of the control logic for the Project W-058 Monitor and Control System, as developed by Programmable Control Services, Inc. The logic is arranged in five appendices, one for each programmable logic controller console

  7. The private healtcare systems in europe. What can we learn from Russia?

    Science.gov (United States)

    Akulin, Igor M; Chesnokova, Ekaterina A; Genovese2, Umberto; Amato, Simona; Ragazzoni, Massimo Gabriele

    2014-01-01

    The European healthcare system is characterized by different kinds of funding: public, insurance-based, and mixed. In Italy, the prolonged economic crisis and the need for a cost reduction in the public administrations make necessary a cut in expenditure, which has a significant impact also on the funding of the healthcare system. The comparison of different European healthcare systems may offer useful insights for a better definition of the European and / or national healthcare provision strategies, which would be economically and financially sustainable but also capable to protect the population health. In this regard, it is worth to analyze the Russian healthcare system, which in the last years has undergone significant changes in its structure and in the way healthcare services are supplied. The peculiarity of the Russian healthcare system, which is quite different from the European standards for both professional requirements and theoretical knowledge, makes Russia an absolutely interesting partner for a future joint venture research. This paper describes the Russian national healthcare system highlights the differences in the demographic and socio-economic structures relatively to the Italian model. The paper supports a reflection on the sustainability of the health care systems and on the organizational forms that would guarantee the supply of better healthcare services in terms of quality, appropriateness and safety, compatibly with its economic sustainability.

  8. The ELENA Programme in the Province of Chieti - A Public Private Partnership Best Practice Improving Energy Efficiency of Buildings and Public Lighting Systems

    Directory of Open Access Journals (Sweden)

    Pierluigi Fecondo

    2015-09-01

    To date, the most relevant Project outcomes consist 87 municipalities involved, a structured database of energy audit and data about 144 buildings and about 46,000 public light points. Moreover, an effective engagement of public and private stakeholders, lays the foundation for a strong Energy Performance Contract framework able to leverage financing based on minimun guaranteed energy savings of 20% in respect to baseline values.

  9. Open environmental data sets - prospect of co-operation between public and private sector in water quality monitoring. Final report of Water Quality Service for Lakes -project; Avoin ympaeristoetieto - yhteistyoen kehittaeminen vesistoejen seurannassa. Jaervien vedenlaatupalvelu -hankkeen loppuraportti

    Energy Technology Data Exchange (ETDEWEB)

    Anttila, S.; Broeckl, M.; Herlevi, A. (and others)

    2012-04-15

    Data sets collected by the public sector are common property and should be freely available. Effective usage of this open data is anticipated to create new information and services, but also to develop welfare for humans. Insufficient usage of public and open environmental data sets in the private sector has been recognized as a problem. Reasons for this can be found from the non-commercial nature of environmental data, the way it is collected and archived, but also from the strong role of public sector in this field. In the Water Quality Service for Lakes -project (Tekes, 2009-2012), we wanted to advance the utilization of the public data sets in the private sector, as well as to promote the co-operation between these two sectors. Starting point was to develop local research infrastructure in the way that collected information would be easily accessible to private companies. This was realized by creating a data base that gathers water quality information from several data sources and provides a standardized interface for the data utilization. In addition, project provided a variety of research results including a questionnaire survey targeted to the users of water quality information, and the methods to increase the accuracy of collected data and to create forecasts from it. A concrete result from the project was also the development of 'laymans' water quality measurement device named as Secchi3000. A digital camera installed in e.g. mobile phones can be used with Secchi3000 device to measure water quality of different natural waters. This new innovation has great potential in e.g. citizen based monitoring. The challenges and opportunities to create business based on the public environmental data were revolved in two work shops. In this publication the prospects of co-operation between public and private sector are discussed based on the results of the Water Quality Service for lakes -project. (orig.)

  10. Redefining Project Management Information Systems with New IT Services

    Directory of Open Access Journals (Sweden)

    Luminita Hurbean

    2013-04-01

    Full Text Available Achieving successful adoption of an innovative project management information system should involve influencing the project management environment by providing useful tools, training, reusable templates, techniques, and methods that improve the project manager's ability to successfully execute. This paper suggests that project management practice, enabled by emerging IT, could more explicitly recognize, represent, and manage the interdependencies that are pervasive throughout projects, thereby fully exploiting the potential of the IT to improve overall project performance. The last few years IT&C evolution led to new approaches to application and infrastructure architecture. Breaking from the traditional procedures used by organizations, they propose a cloud operating platform that reduces complexity and improves agility and scalability by altering the approach to the way data centres are built, applications are developed, infrastructure is managed, and organizations align and collaborate. Further, the paper explores the growing impact of mobile computing, cloud delivery and social business collaboration project management information systems and proposes a shift of a Five C’s for information systems in a cloud based operating platform, driven by cooperation, teamwork and continuous improvement.The proposed shift in the cloud indicates actual tools that may be adopted for better collaboration and higher business value of the project information management.

  11. Function Projective Synchronization of Two Identical New Hyperchaotic Systems

    International Nuclear Information System (INIS)

    Li Xin; Chen Yong

    2007-01-01

    A function projective synchronization of two identical hyperchaotic systems is defined and the theorem of sufficient condition is given. Based on the active control method and symbolic computation Maple, the scheme of function projective synchronization is developed to synchronize the two identical new hyperchaotic systems constructed by Yan up to a scaling function matrix with different initial values. Numerical simulations are used to verify the effectiveness of the scheme.

  12. Systems design and engineering : facilitating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    2016-01-01

    As its name implies, the aim of Systems Design and Engineering: Facilitating Multidisciplinary Development Projects is to help systems engineers develop the skills and thought processes needed to successfully develop and implement engineered systems. Such expertise typically does not come through

  13. Tank waste remediation system characterization project quality policies

    International Nuclear Information System (INIS)

    Board, D.C.

    1997-01-01

    This quality plan describes the system used by Characterization Project management to achieve quality. This plan is comprised of eleven quality policies which, when taken together, form a management system deployed to achieve quality. This quality management system is based on the customer's quality requirements known as the 'RULE', 10 CFR 830.120, Quality Assurance

  14. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  15. Major Components of the National TRU Waste System Optimization Project

    International Nuclear Information System (INIS)

    Moody, D.C.; Bennington, B.; Sharif, F.

    2002-01-01

    The National Transuranic (TRU) Program (NTP) is being optimized to allow for disposing of the legacy TRU waste at least 10 years earlier than originally planned. This acceleration will save the nation an estimated $713. The Department of Energy's (DOE'S) Carlsbad Field Office (CBFO) has initiated the National TRU Waste System Optimization Project to propose, and upon approvaI, implement activities that produce significant cost saving by improving efficiency, thereby accelerating the rate of TRU waste disposal without compromising safety. In its role as NTP agent of change, the National TRU Waste System Optimization Project (the Project) (1) interacts closely with all NTP activities. Three of the major components of the Project are the Central Characterization Project (CCP), the Central Confirmation Facility (CCF), and the MobiIe/Modular Deployment Program.

  16. Extending the GANIL control system for the SPIRAL project

    International Nuclear Information System (INIS)

    Lecorche, E.

    1997-01-01

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author)

  17. Extending the GANIL control system for the SPIRAL project

    Energy Technology Data Exchange (ETDEWEB)

    Lecorche, E

    1997-12-31

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author) 5 refs.

  18. Space Object and Light Attribute Rendering (SOLAR) Projection System

    Science.gov (United States)

    2017-05-08

    depicting the proposed SOLAR projection system. The installation process is shown in Fig. 3. SOLAR system comprises of a dome that houses Digitairum’s...imaging process. A fiberglass dome system was erected to make the SOLAR system a self contained facility. Calibration process was carried out to register...Separate software solutions were implemented to model the light transport processes involved in the imaging process. A fiberglass dome system was erected to

  19. Technology Investments in the NASA Entry Systems Modeling Project

    Science.gov (United States)

    Barnhardt, Michael; Wright, Michael; Hughes, Monica

    2017-01-01

    The Entry Systems Modeling (ESM) technology development project, initiated in 2012 under NASAs Game Changing Development (GCD) Program, is engaged in maturation of fundamental research developing aerosciences, materials, and integrated systems products for entry, descent, and landing(EDL)technologies [1]. To date, the ESM project has published over 200 papers in these areas, comprising the bulk of NASAs research program for EDL modeling. This presentation will provide an overview of the projects successes and challenges, and an assessment of future investments in EDL modeling and simulation relevant to NASAs mission

  20. Research on calibration algorithm in laser scanning projection system

    Science.gov (United States)

    Li, Li Juan; Qu, Song; Hou, Mao Sheng

    2017-10-01

    Laser scanning projection technology can project the image defined by the existing CAD digital model to the working surface, in the form of a laser harness profile. This projection is in accordance with the ratio of 1: 1. Through the laser harness contours with high positioning quality, the technical staff can carry out the operation with high precision. In a typical process of the projection, in order to determine the relative positional relationship between the laser projection instrument and the target, it is necessary to place several fixed reference points on the projection target and perform the calibration of projection. This position relationship is the transformation from projection coordinate system to the global coordinate system. The entire projection work is divided into two steps: the first step, the calculation of the projector six position parameters is performed, that is, the projector calibration. In the second step, the deflection angle is calculated by the known projector position parameter and the known coordinate points, and then the actual model is projected. Typically, the calibration requires the establishment of six reference points to reduce the possibility of divergence of the nonlinear equations, but the whole solution is very complex and the solution may still diverge. In this paper, the distance is detected combined with the calculation so that the position parameters of the projector can be solved by using the coordinate values of three reference points and the distance of at least one reference point to the projector. The addition of the distance measurement increases the stability of the solution of the nonlinear system and avoids the problem of divergence of the solution caused by the reference point which is directly under the projector. Through the actual analysis and calculation, the Taylor expansion method combined with the least squares method is used to obtain the solution of the system. Finally, the simulation experiment is

  1. Threats to private forest lands in the U.S.A.: a forests on the edge study

    Science.gov (United States)

    Mark H. Hatfield; Ronald E. McRoberts; Dacia M. Meneguzzo; Sara. Comas

    2010-01-01

    The Forests on the Edge project, sponsored by the USDA Forest Service, uses geographic information systems to construct and analyze maps depicting threats to the contributions of America’s private forest lands. For this study, watersheds across the conterminous United States are evaluated with respect to the amount of their private forest land. Watersheds with at least...

  2. White Pine Co. Public School System Biomass Conversion Heating Project

    Energy Technology Data Exchange (ETDEWEB)

    Paul Johnson

    2005-11-01

    The White Pine County School District and the Nevada Division of Forestry agreed to develop a pilot project for Nevada using wood chips to heat the David E. Norman Elementary School in Ely, Nevada. Consideration of the project was triggered by a ''Fuels for Schools'' grant that was brought to the attention of the School District. The biomass project that was part of a district-wide energy retrofit, called for the installation of a biomass heating system for the school, while the current fuel oil system remained as back-up. Woody biomass from forest fuel reduction programs will be the main source of fuel. The heating system as planned and completed consists of a biomass steam boiler, storage facility, and an area for unloading and handling equipment necessary to deliver and load fuel. This was the first project of it's kind in Nevada. The purpose of the DOE funded project was to accomplish the following goals: (1) Fuel Efficiency: Purchase and install a fuel efficient biomass heating system. (2) Demonstration Project: Demonstrate the project and gather data to assist with further research and development of biomass technology; and (3) Education: Educate the White Pine community and others about biomass and other non-fossil fuels.

  3. NNWSI project information management system concepts evaluation report. Final report

    International Nuclear Information System (INIS)

    1986-08-01

    This report is intended as a first step in developing detailed information management system specifications for the Nevada Nuclear Waste Storage Investigations (NNWSI) Project. The current state of information management at the NNWSI Project level is investigated and an information management system (IMS) is proposed. The IMS as it relates to aspects of Project and records management is discussed. Information management concepts and prospective IMS system components are investigated. Concepts and system components include: indexing, searching, retrieval, data base management system technology, computers, storage media, computer-assisted retrieval (CAR) of microfilm, electronic imaging-based systems, optical character recognition, and communications. Performance criteria and desirable system attributes applicable to the IMS are discussed. Six conceptual system approaches capable of satisfying the performance criteria are defined. System approaches include: fully centralized microfilm system based on CAR retrieval (Approach 1), partially distributed microfilm system based on CAR retrieval (Approach 2), fully distributed microfilm system based on CAR retrieval (Approach 3), fully centralized optical disk system based on electronic image and full-text retrieval (Approach 4), partially distributed optical system based on electron image and full-text retrieval (Approach 5), and fully distributed optical disk system based on electronic image and full-text retrieval (Approach 6). Technical and cost considerations associated with the six conceptual approaches are evaluated. Technical evaluation results indicate Approach 4 is the best conceptual approach, and cost evaluation results show no significant differences among approaches. On the basis of the evaluation, Approach 4 is recommended

  4. Solutions to Improve Person Transport System in the Pitesti City by Analyzing Public Transport vs. Private Transport

    Science.gov (United States)

    Mihaela, Istrate; Alexandru, Boroiu; Viorel, Nicolae; Ionel, Vieru

    2017-10-01

    One of the major problems facing the Pitesti city is the road congestion that occurs in the central area of the city during the peak hours. With all the measures taken in recent years - the widening of road arteries, increasing the number of parking spaces, the creation of overground road passages - it is obvious that the problem can only be solved by a new philosophy regarding urban mobility: it is no longer possible to continue through solutions to increase the accessibility of the central area of the city, but it is necessary, on the contrary, to promote a policy of discouraging the penetration of vehicles in the city center, coupled with a policy of improving the connection between urban public transport and county public transport. This new approach is also proposed in the new Urban Mobility Plan of Pitesti city, under development. The most convincing argument for the necessity of this new orientation in the Pitesti city mobility plan is based on the analysis of the current situation of passenger transport on the territory of Pitesti city: the analysis of “public transport versus private transport” reveals a very low occupancy rate for cars and the fact that the road surface required for a passenger (the dynamic area) is much higher in the case of private transport than in the case of public transport. Measurements of passenger flows and vehicle flows on the 6 penetration ways in the city have been made and the calculations clearly demonstrate the benefits of an urban public transport system connected by “transshipment buses” to be made at the edge of the city, to the county public transport system. In terms of inter-county transport, it will continue to be connected to the urban public transport system by existing bus Station, within the city: South Bus Station and North Bus Station. The usefulness of the paper is that it identifies the solutions for sustainable mobility in Pitesti city and proposes concrete solutions for the development of the

  5. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    International Nuclear Information System (INIS)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations

  6. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  7. Generalized projective synchronization of chaotic systems via adaptive learning control

    International Nuclear Information System (INIS)

    Yun-Ping, Sun; Jun-Min, Li; Hui-Lin, Wang; Jiang-An, Wang

    2010-01-01

    In this paper, a learning control approach is applied to the generalized projective synchronisation (GPS) of different chaotic systems with unknown periodically time-varying parameters. Using the Lyapunov–Krasovskii functional stability theory, a differential-difference mixed parametric learning law and an adaptive learning control law are constructed to make the states of two different chaotic systems asymptotically synchronised. The scheme is successfully applied to the generalized projective synchronisation between the Lorenz system and Chen system. Moreover, numerical simulations results are used to verify the effectiveness of the proposed scheme. (general)

  8. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    OpenAIRE

    Hudson, L. N.; Newbold, T.; Contu, S.; Hill, S. L.; Lysenko, I.; De Palma, A.; Phillips, H. R.; Alhusseini, T. I.; Bedford, F. E.; Bennett, D. J.; Booth, H.; Burton, V. J.; Chng, C. W.; Choimes, A.; Correia, D. L.

    2017-01-01

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to develop global and regional statistical models of how local biodiversity responds to these measures. We describe and make free...

  9. ABOUT THE SYSTEM ANALYSIS OF UNEMPLOYMENT OF YOUTH: GENERAL TASKS AND PRIVATE MODELS OF MARKET INDICATORS

    Directory of Open Access Journals (Sweden)

    Natalia V. Kontsevaya

    2016-01-01

    Full Text Available In this work attempt of system approach to the analysis of labor market of youth is made, the place and a role of youth labor exchange are dened, opportunities and methods of state regulation are opened, contradictions in the analysis of the main market indicators are designated.Within system approach to the analysis of dynamics of market processes modeling of the main indicators of labor market in regional scale is shown.This approach can be useful when developing effective and economically reasonable mechanisms of employment of youth, both at the level of regional services of employment, and in the state scale

  10. Understanding large social-ecological systems: introducing the SESMAD project

    Directory of Open Access Journals (Sweden)

    Michael Cox

    2014-08-01

    Full Text Available This article introduces the Social-ecological systems meta-analysis database (SESMAD project, which is the project behind the case studies and synthetic articles contained in this special issue of the International Journal of the Commons. SESMAD is an internationally collaborative meta-analysis project that builds on previous seminally synthetic work on small-scale common-pool resource systems conducted at the Workshop in Political Theory and Policy Analysis at Indiana University. This project is guided by the following research question: can the variables found to be important in explaining outcomes on small-scale systems be scaled up to explain outcomes in large-scale environmental governance? In this special issue we report on our findings thus far through a set of case studies of large-scale environmental governance, a paper that describes our conceptual advances, and a paper that compares these five case studies to further examine our central research question.

  11. Privatization of Public Universities: How the Budget System Affects the Decision-Making Strategy of Deans

    Science.gov (United States)

    Volpatti, Mark Christopher

    2013-01-01

    In response to lower funding commitments, many public colleges and universities have elected to incorporate decentralized budgeting systems, one of which is Responsibility Center Management (RCM). As public institutions are becoming more dependent on tuition dollars because state appropriations are declining, deans have an increased responsibility…

  12. System biology and the project Encode

    Directory of Open Access Journals (Sweden)

    M. Yu. Obolenskaya

    2014-08-01

    Full Text Available The goal of this review is to give an incipient knowledge on the background of system biology, the premises to its assignment as a new branch of biology, its principles, methodology and its great achievements in identification of functional elements of human genome and regulation of their concordant­ and differential activity. The short characteristics of functional elements including the protein-coding sequences and those coding noncoding RNAs, the DNAse 1 hypersensitivity sites and methylated CpG islets, modified histones and specific 3D structure of chromatin, are represented. The topology of transcription factors network with its main motifs, hierar­chy, combination and association of transcription factors and their allelic specificity are highlighted­.

  13. The BIRN Project: Imaging the Nervous System

    International Nuclear Information System (INIS)

    Ellisman, Mark

    2006-01-01

    The grand goal in neuroscience research is to understand how the interplay of structural, chemical and electrical signals in nervous tissue gives rise to behavior. Experimental advances of the past decades have given the individual neuroscientist an increasingly powerful arsenal for obtaining data, from the level of molecules to nervous systems. Scientists have begun the arduous and challenging process of adapting and assembling neuroscience data at all scales of resolution and across disciplines into computerized databases and other easily accessed sources. These databases will complement the vast structural and sequence databases created to catalogue, organize and analyze gene sequences and protein products. The general premise of the neuroscience goal is simple; namely that with 'complete' knowledge of the genome and protein structures accruing rapidly we next need to assemble an infrastructure that will facilitate acquisition of an understanding for how functional complexes operate in their cell and tissue contexts.

  14. TMI defueling project fuel debris removal system

    International Nuclear Information System (INIS)

    Burdge, B.

    1992-01-01

    The three mile Island Unit 2 (TMI-2) pressurized water reactor loss-of-coolant accident on March 28, 1979, presented the nuclear community with many challenging remediation problems; most importantly, the removal of the fission products within the reactor containment vessel. To meet this removal problem, an air-lift system (ALS) can be used to employ compressed air to produce the motive force for transporting debris. Debris is separated from the transport stream by gravity separation. The entire method does not rely on any moving parts. Full-scale testing of the ALS at the Idaho National Engineering Laboratory (INEL) has demonstrated the capability of transporting fuel debris from beneath the LCSA into a standard fuel debris bucket at a minimum rate of 230 kg/min

  15. Private placements

    International Nuclear Information System (INIS)

    Bugeaud, G. J. R.

    1998-01-01

    The principles underlying private placements in Alberta, and the nature of the processes employed by the Alberta Securities Commission in handling such transactions were discussed. The Alberta Securities Commission's mode of operation was demonstrated by the inclusion of various documents issued by the Commission concerning (1) special warrant transactions prior to listing, (2) a decision by the Executive Director refusing to issue a receipt for the final prospectus for a distribution of securities of a company and the reasons for the refusal, (3) the Commission's decision to interfere with the Executive Director's decision not to issue a receipt for the final prospectus, with full citation of the Commission's reasons for its decision, (4) and a series of proposed rules and companion policy statements regarding trades and distributions outside and in Alberta. Text of a sample 'short form prospectus' was also included

  16. Once Upon a Time There Was a Private Bill Issuing Bank System. Mexico, 1897-1910

    Directory of Open Access Journals (Sweden)

    Mónica Gómez

    2011-04-01

    Full Text Available This paper seeks to establish whether the Mexican issuing banks of the late 19th and early 20th centuries constituted a stable system. The results show that there was a limit to the volume of bills that Banamex –the most important privileged bank– issued, which contributed to the system’s stability. In the same way, the system was able to survive the panic caused by the world crisis of 1907-1908 without losses for banking customers or fiscal costs. This was possible thanks to the financial aid offered by Banamex and the Banco Central Mexicano –a mutual benefit interbank society–, and to the timely government action.

  17. University clinic and private practice treatment outcomes in Class I extraction and nonextraction patients: A comparative study with the American Board of Orthodontics Objective Grading System.

    Science.gov (United States)

    Mislik, Barbara; Konstantonis, Dimitrios; Katsadouris, Alexios; Eliades, Theodore

    2016-02-01

    The aim of this study was to compare treatment outcomes in university vs private practice settings with Class I patients using the American Board of Orthodontics Objective Grading System. A parent sample of 580 Class I patients treated with and without extractions of 4 first premolars was subjected to discriminant analysis to identify a borderline spectrum of 66 patients regarding the extraction modality. Of these patients, 34 were treated in private orthodontic practices, and 32 were treated in a university graduate orthodontic clinic. The treatment outcomes were evaluated using the 8 variables of the American Board of Orthodontics Objective Grading System. The total scores ranged from 10 to 47 (mean, 25.44; SD, 9.8) for the university group and from 14 to 45 (mean, 25.94; SD, 7.7) for the private practice group. The university group achieved better scores for the variables of buccolingual inclination (mean difference, 2.28; 95% confidence interval [CI], 0.59, 3.98; P = 0.01) and marginal ridges (mean difference, 1.32; 95% CI, 0.28, 2.36; P = 0.01), and the private practice group achieved a better score for the variable of root angulation (mean difference, -0.65; 95% CI, -1.26, -0.03; P = 0.04). However, no statistically intergroup differences were found between the total American Board of Orthodontics Objective Grading System scores (mean difference, -0.5; 95% CI, -3.82, 4.82; P = 0.82). Patients can receive similar quality of orthodontic treatment in a private practice and a university clinic. The orthodontists in the private practices were more successful in angulating the roots properly, whereas the orthodontic residents accomplished better torque control of the posterior segments and better marginal ridges. Copyright © 2016 American Association of Orthodontists. Published by Elsevier Inc. All rights reserved.

  18. Network security vulnerabilities and personal privacy issues in Healthcare Information Systems: a case study in a private hospital in Turkey.

    Science.gov (United States)

    Namoğlu, Nihan; Ulgen, Yekta

    2013-01-01

    Healthcare industry has become widely dependent on information technology and internet as it moves from paper to electronic records. Healthcare Information System has to provide a high quality service to patients and a productive knowledge share between healthcare staff by means of patient data. With the internet being commonly used across hospitals, healthcare industry got its own share from cyber threats like other industries in the world. The challenge is allowing knowledge transfer to hospital staff while still ensuring compliance with security mandates. Working in collaboration with a private hospital in Turkey; this study aims to reveal the essential elements of a 21st century business continuity plan for hospitals while presenting the security vulnerabilities in the current hospital information systems and personal privacy auditing standards proposed by regulations and laws. We will survey the accreditation criteria in Turkey and counterparts in US and EU. We will also interview with medical staff in the hospital to understand the needs for personal privacy and the technical staff to perceive the technical requirements in terms of network security configuration and deployment. As hospitals are adopting electronic transactions, it should be considered a must to protect these electronic health records in terms of personal privacy aspects.

  19. A projective surgical navigation system for cancer resection

    Science.gov (United States)

    Gan, Qi; Shao, Pengfei; Wang, Dong; Ye, Jian; Zhang, Zeshu; Wang, Xinrui; Xu, Ronald

    2016-03-01

    Near infrared (NIR) fluorescence imaging technique can provide precise and real-time information about tumor location during a cancer resection surgery. However, many intraoperative fluorescence imaging systems are based on wearable devices or stand-alone displays, leading to distraction of the surgeons and suboptimal outcome. To overcome these limitations, we design a projective fluorescence imaging system for surgical navigation. The system consists of a LED excitation light source, a monochromatic CCD camera, a host computer, a mini projector and a CMOS camera. A software program is written by C++ to call OpenCV functions for calibrating and correcting fluorescence images captured by the CCD camera upon excitation illumination of the LED source. The images are projected back to the surgical field by the mini projector. Imaging performance of this projective navigation system is characterized in a tumor simulating phantom. Image-guided surgical resection is demonstrated in an ex-vivo chicken tissue model. In all the experiments, the projected images by the projector match well with the locations of fluorescence emission. Our experimental results indicate that the proposed projective navigation system can be a powerful tool for pre-operative surgical planning, intraoperative surgical guidance, and postoperative assessment of surgical outcome. We have integrated the optoelectronic elements into a compact and miniaturized system in preparation for further clinical validation.

  20. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls

    International Nuclear Information System (INIS)

    Mullee, G.R.

    1986-01-01

    The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on system status, tag-outs, radiological work permits, etc. An ongoing effort is being directed toward maintaining operating instructions and system schematics, etc. current as the Plant configuration changes. The experience with the Configuration Control System to date has been favorable