WorldWideScience

Sample records for system operation review

  1. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  2. Operating System Concepts for Reconfigurable Computing: Review and Survey

    OpenAIRE

    Eckert, Marcel; Meyer, Dominik; Haase, Jan; Klauer, Bernd

    2016-01-01

    One of the key future challenges for reconfigurable computing is to enable higher design productivity and a more easy way to use reconfigurable computing systems for users that are unfamiliar with the underlying concepts. One way of doing this is to provide standardization and abstraction, usually supported and enforced by an operating system. This article gives historical review and a summary on ideas and key concepts to include reconfigurable computing aspects in operating systems. The arti...

  3. Fire protection system operating experience review for fusion applications

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, L.C.

    1995-12-01

    This report presents a review of fire protection system operating experiences from particle accelerator, fusion experiment, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of fire protection system component failure rates and fire accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with these systems are discussed, including spurious operation. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor.

  4. Fire protection system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1995-12-01

    This report presents a review of fire protection system operating experiences from particle accelerator, fusion experiment, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of fire protection system component failure rates and fire accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with these systems are discussed, including spurious operation. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor

  5. Ventilation Systems Operating Experience Review for Fusion Applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1999-01-01

    This report is a collection and review of system operation and failure experiences for air ventilation systems in nuclear facilities. These experiences are applicable for magnetic and inertial fusion facilities since air ventilation systems are support systems that can be considered generic to nuclear facilities. The report contains descriptions of ventilation system components, operating experiences with these systems, component failure rates, and component repair times. Since ventilation systems have a role in mitigating accident releases in nuclear facilities, these data are useful in safety analysis and risk assessment of public safety. An effort has also been given to identifying any safety issues with personnel operating or maintaining ventilation systems. Finally, the recommended failure data were compared to an independent data set to determine the accuracy of individual values. This comparison is useful for the International Energy Agency task on fusion component failure rate data collection

  6. Review on Islanding Operation of Distribution System with Distributed Generation

    DEFF Research Database (Denmark)

    Mahat, Pukar; Chen, Zhe; Bak-Jensen, Birgitte

    2011-01-01

    The growing environmental concern and various benefits of distributed generation (DG) have resulted in significant penetration of DG in many distribution systems worldwide. One of the major expected benefits of DG is the improvement in the reliability of power supply by supplying load during power...... outage by operating in an island mode. However, there are many challenges to overcome before islanding operation of a distribution system with DG can become a viable solution in future. This paper reviews some of the major challenges with islanding operation and explores some possible solutions...

  7. Operating System Concepts for Reconfigurable Computing: Review and Survey

    Directory of Open Access Journals (Sweden)

    Marcel Eckert

    2016-01-01

    Full Text Available One of the key future challenges for reconfigurable computing is to enable higher design productivity and a more easy way to use reconfigurable computing systems for users that are unfamiliar with the underlying concepts. One way of doing this is to provide standardization and abstraction, usually supported and enforced by an operating system. This article gives historical review and a summary on ideas and key concepts to include reconfigurable computing aspects in operating systems. The article also presents an overview on published and available operating systems targeting the area of reconfigurable computing. The purpose of this article is to identify and summarize common patterns among those systems that can be seen as de facto standard. Furthermore, open problems, not covered by these already available systems, are identified.

  8. Cryogenic system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1992-01-01

    This report presents a review of cryogenic system operating experiences, from particle accelerator, fusion experiment, space research, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of cryogenic component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with cryogenic systems are discussed, including ozone formation, effects of spills, and modeling spill behavior. This information should be useful to fusion system designers and safety analysts, such as the team working on the International Thermonuclear Experimental Reactor design

  9. Cryogenic system operating experience review for fusion applications

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, L.C.

    1992-01-01

    This report presents a review of cryogenic system operating experiences, from particle accelerator, fusion experiment, space research, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of cryogenic component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with cryogenic systems are discussed, including ozone formation, effects of spills, and modeling spill behavior. This information should be useful to fusion system designers and safety analysts, such as the team working on the International Thermonuclear Experimental Reactor design.

  10. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930's, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D'Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation

  11. Columbia River System Operation Review final environmental impact statement. Appendix A: River Operation Simulation (ROSE)

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The River Operation Simulation Experts (ROSE) work group is comprised of representatives of the Corps, BPA, Reclamation, NMFS, Pacific Northwest Utilities Conference Committee (PNUCC), and Northwest Power Planning Council (NPPC). ROSE was responsible for using computer hydroregulation models to simulate the operation of the river system for all of the alternatives evaluated in screening and full scale analysis in SOR. These models are complex computer programs which sequentially route streamflows through each dam in the system, calculating the streamflows, reservoir elevations, spill, power generation and other information at each project and pertinent locations on the river system. ROSE first reviewed specifications of proposed alternatives to determine whether such alternatives were formulated adequately to be run on hydroregulation models

  12. Columbia River System Operation Review final environmental impact statement. Summary

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River System Operation Review (SOR) is being conducted jointly by the US Army Corps of Engineers, the Bureau of Reclamation, and the Bonneville Power Administration. This summary of the SOR story begins where the Draft EIS summary left off. It is divided into seven parts, each of which reports some aspect of the study's outcome: Part 1 is a history. The SOR was not a simple study on any level, and to understand the EIS alternatives, some background is necessary. Part 2 reports the major findings of the technical analysis of alternative system operating strategies, and presents the agencies' Preferred Alternative. Part 3 explains actions the agencies may take with respect to the Columbia River Regional Forum, the Pacific Northwest Coordination Agreement, and the Canadian Entitlement Allocation Agreements. Part 4 presents the Purpose and Need, elements at the core of any Federal EIS. It includes a map showing the Columbia River Basin and information on the affected Federal projects. Part 5 describes the substantial public participation and outreach that occurred during the SOR, and Part 6 summarizes efforts to incorporate the Tribal perspective into the study. Part 7 describes other activities that will be taking place in the next few years, which are related to and build upon the SOR

  13. Review of Operation and Maintenance Support Systems for Research Reactors

    International Nuclear Information System (INIS)

    Jin, Kyungho; Heo, Gyunyoung; Park, Jaekwan

    2014-01-01

    Operation support systems do not directly control the plant but it can aid decision making itself by obtaining and analyzing large amounts of data. Recently, the demand of research reactor is growing and the need for operation support systems is increasing, but it has not been applied for research reactors. This study analyzes operation and maintenance support systems of NPPs and suggests appropriate systems for research reactors based on analysis. In this paper, operation support systems for research reactors are suggested by comparing with those of power reactors. Currently, research reactors do not cover special systems in order to improve safety and operability in comparison with power reactors. Therefore we expect to improve worth to use by introducing appropriate systems for research reactors. In further research, we will develop an appropriate system such as applications or tools that can be applied to the research reactor

  14. Review on open source operating systems for internet of things

    Science.gov (United States)

    Wang, Zhengmin; Li, Wei; Dong, Huiliang

    2017-08-01

    Internet of Things (IoT) is an environment in which everywhere and every device became smart in a smart world. Internet of Things is growing vastly; it is an integrated system of uniquely identifiable communicating devices which exchange information in a connected network to provide extensive services. IoT devices have very limited memory, computational power, and power supply. Traditional operating systems (OS) have no way to meet the needs of IoT systems. In this paper, we thus analyze the challenges of IoT OS and survey applicable open source OSs.

  15. A review of the National pharmacovigilance system in Malta - implementing and operating a pharmacovigilance management system.

    Science.gov (United States)

    Tanti, Amy; Micallef, Benjamin; Serracino-Inglott, Anthony; Borg, John-Joseph

    2017-01-01

    Regulatory authorities have a legal mandate to implement and maintain a Pharmacovigilance System designed to monitor the safety of authorised medicinal products and detect any change to their risk-benefit balance. Areas covered: This review maps the implementation of pharmacovigilance activities in Malta since accession in the EU in mid 2004 and discusses the challenges the Maltese Regulator encountered while setting up adequate and effective systems to fulfil its legal mandate. Areas reviewed are those around ADR reporting, promotion and safety communications including rapid alerts and recalls, direct healthcare professional communications, risk minimisation measures and safety circulars and quality systems. Expert opinion: Within a ten year period, 3 EU directives on pharmacovigilance were implemented by our agency. Despite limitations to resources, based on a prioritised implementation, the legislation provisions are now fully operational with a good level of sustainability. Lessons learnt from this process are discussed in this review. The coming years will involve strengthening and consolidation of existing processes.

  16. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    This study attempts to identify and analyze the impacts of the System Operating Strategy (SOS) alternatives on cultural resources. The impacts include effects on Native American traditional cultural values, properties and practices. They also include effects on archeological or historic properties meeting the criteria of the National Register of Historic Places. In addition to responding to the requirements of the National Environmental Policy Act (NEPA), this analysis addresses the requirements of the National Historic Preservation Act (NHPA), the Archeological Resources Protection Act (ARPA), the Native American Graves Protection and Repatriation Act (NAGPRA), the Native American Religious Freedom Act (NARFA), and other relevant legislation. To meet their legally mandated cultural resources requirements, the SOR agencies will develop agreements and Implementation Plans with the appropriate State Historic Preservation Officers (SHPOs), Tribes, and the Advisory Council on Historic Preservation (ACHP) detailing the measures necessary to best manage the resource. The planning and implementation activities will be staged over a number of years in consultation with affected Tribes

  17. Columbia River System Operation Review final environmental impact statement. Appendix T: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix documents the public and agency review of the SOR Draft EIS and how the SOR agencies used the review to formulate the FINAL EIS. The appendix includes a summary of the review process, a discussion of the nature of the comments, a list of all commentors, reproductions of comment letters, and responses to all comments. Changes in the EIS text in response to comments are noted in the responses

  18. Operating experience review of an INL gas monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, Lee C. [Idaho National Lab. (INL), Idaho Falls, ID (United States); DeWall, K. G. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Herring, J. S. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-03-12

    This article describes the operations of several types of gas monitors in use at the Idaho National Laboratory (INL) High Temperature Electrolysis Experiment (HTE) laboratory. The gases monitored in the lab room are hydrogen, carbon monoxide, carbon dioxide, and oxygen. The operating time, calibration, and both actual and unwanted alarms are described. The calibration session time durations are described. In addition, some simple calculations are given to estimate the reliability of these monitors and the results are compared to operating experiences of other types of monitors.

  19. Columbia River System Operation Review final environmental impact statement. Appendix L: Soils, geology and groundwater

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix addresses the study of geology, soils, and groundwater concerns relative to the System Operation Review (SOR). Chapter 1 provides an overview of the study, scope, and process for this resource area. In order, the respective sections of this chapter discuss the relevant issues for the study, and the means by which the SOR team carried out the study

  20. Cooperation between information system development and operations: a literature review

    NARCIS (Netherlands)

    Erich, Floris; Amrit, Chintan Amrit; Daneva, Maia; Torchiano, M.

    2014-01-01

    Software development can profit from improvements in the deployment and maintenance phases. DevOps improves these phases through a collection of principles and practices, centered around close collaboration between Development and Operations personnel. Both sides have paid little attention to issues

  1. Operating systems

    CERN Document Server

    Tsichritzis, Dionysios C; Rheinboldt, Werner

    1974-01-01

    Operating Systems deals with the fundamental concepts and principles that govern the behavior of operating systems. Many issues regarding the structure of operating systems, including the problems of managing processes, processors, and memory, are examined. Various aspects of operating systems are also discussed, from input-output and files to security, protection, reliability, design methods, performance evaluation, and implementation methods.Comprised of 10 chapters, this volume begins with an overview of what constitutes an operating system, followed by a discussion on the definition and pr

  2. Review of Ground Systems Development and Operations (GSDO) Tools for Verifying Command and Control Software

    Science.gov (United States)

    Aguilar, Michael L.; Bonanne, Kevin H.; Favretto, Jeffrey A.; Jackson, Maddalena M.; Jones, Stephanie L.; Mackey, Ryan M.; Sarrel, Marc A.; Simpson, Kimberly A.

    2014-01-01

    The Exploration Systems Development (ESD) Standing Review Board (SRB) requested the NASA Engineering and Safety Center (NESC) conduct an independent review of the plan developed by Ground Systems Development and Operations (GSDO) for identifying models and emulators to create a tool(s) to verify their command and control software. The NESC was requested to identify any issues or weaknesses in the GSDO plan. This document contains the outcome of the NESC review.

  3. NSSS aging review: critical systems operating measures and monitoring

    International Nuclear Information System (INIS)

    Quero, J.R.

    1985-05-01

    How long the nuclear plants can get. In this question we can find three main aspects: Economic - Licensing - and Technical ones. The final answer to this question will include compulsory elements coming from these three areas, each of them being a deciding factor. The presentation is focused on the technical aspect; but before a few comments are done on economic and licensing factors. Then, some particular technical items dealing with aging or life time of our nuclear plants are reviewed: electrical equipment, heat exchangers (steam generators), wear: primary pump, embrittlement: Reactor Pressure Vessel (Austeno-ferritic parts), fatigue (Thermo-hydraulic transients). By the way, some information about how this problem is handled, at the present time, explicitely or implicitely in France are given

  4. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings

  5. Operational Readiness Review Final Report for K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    An Operational Readiness Review (ORR) was conducted by the U.S. Department of Energy (DOE), Richland Operations Office (RL) to verify that an adequate state of readiness had been achieved for startup of the K Basin Fuel Transfer System (FTS). The DOE ORR was conducted during the period November 6-18, 2002. The DOE ORR team concluded that the K Basin Fuel Transfer System is ready to start operations, subject to completion and verification of identified pre-start findings. The ORR was conducted in accordance with the Spent Nuclear Fuel (SNF) K Basin Fuel Transfer System (FTS) Operational Readiness Review (ORR) Plan of Action and the Operational Readiness Review Implementation Plan for K Basin Fuel Transfer System. Review activities consisted of staff interviews, procedure and document reviews, and observations of normal facility operations, operational upset conditions, and an emergency drill. The DOE ORR Team also reviewed and assessed the adequacy of the contractor ORR3 and the RL line management review. The team concurred with the findings and observations identified in these two reports. The DOE ORR for the FTS evaluated the contractor under single-shift operations. Of concern to the ORR Team was that SNF Project management intended to change from a single-shift FTS operation to a two-shift operation shortly after the completion of the DOE ORR. The ORR team did not assess two-shift FTS operations and the ability of the contractor to conduct a smooth transition from shift to shift. However, the DOE ORR team did observe an operational upset drill that was conducted during day shift and carried over into swing shift; during this drill, swing shift was staffed with fewer personnel as would be expected for two-shift operations. The facility was able to adequately respond to the event with the reduced level of staff. The ORR Team was also able to observe a Shift Manager turnover meeting when one shift manager had to be relieved during the middle of the day. The ORR

  6. Columbia River System Operation Review final environmental impact statement. Appendix G: Land use and development

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. The SOR began in early 1990, prior to the filing of petitions for endangered status for several salmon species under the Endangered Species Act. The comprehensive review of Columbia River operations encompassed by the SOR was prompted by the need for Federal decisions to (1) develop a coordinated system operating strategy (SOS) for managing the multiple uses of the system into the 21st century; (2) provide interested parties with a continuing and increased long-term role in system planning (Columbia River Regional Forum); (3) renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA), a contractual arrangement among the region's major hydroelectric-generating utilities and affected Federal agencies to provide for coordinated power generation on the Columbia River system; and (4) renew or develop new Canadian Entitlement Allocation Agreements. The review provides the environmental analysis required by the National Environmental Policy Act (NEPA). This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR

  7. Operating Systems

    Indian Academy of Sciences (India)

    M Suresh Babu is currently a fourth year undergraduate student in the Department of. Computer Science and. Engineering, Narayana. Engineering College,. Nellore, Andhra Pradesh. He would like to work in operating systems, computer networks and also in Internet security concepts. Keywords. Operating systems, file sys-.

  8. Columbia River System Operation Review final environmental impact statement. Appendix M: Water quality

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. Analysis of water quality begins with an account of the planning and evaluation process, and continues with a description of existing water quality conditions in the Columbia River Basin. This is followed by an explanation how the analysis was conducted. The analysis concludes with an assessment of the effects of SOR alternatives on water quality and a comparison of alternatives

  9. Columbia River System Operation Review final environmental impact statement. Appendix E: Flood control

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The Corps of Engineers, Bonneville Power Administration, and Bureau of Reclamation conducted a scoping process consisting of a series of regionwide public meetings and solicitation of written comments in the summer of 1990. Comments on flood control issues were received from all parts of the Columbia river basin. This appendix includes issues raised in the public scoping process, as well as those brought for consideration by members of the Flood Control Work Group

  10. Operating Systems

    Indian Academy of Sciences (India)

    The process concept and concurrency are at the heart of modern operating systems (OS). A process is the unit of work in a computer system. A process must be in main memory during execution. To improve the utilization of central processing unit. (CPU) as well as the speed of its response to its users, the computer must ...

  11. Columbia River system operation review: Final environmental impact statement. Main report exhibits

    International Nuclear Information System (INIS)

    1995-11-01

    This Volume is a part of the Final Environmental Impact Statement (EIS) for the Columbia River System. This volume contains technical exhibits of cultural resources and commentary on the (System Operation Review) SOR process. The Confederated Tribes of the Umatilla Indian Reservation comment is the majority of the material in the volume, in the Consultation Plan, Identification of trust resources; Criteria for the selection of a System Operating Strategy; comment on rights protection and implementation of Federal Trust responsibility; analysis of the draft EIS. Comment by other Native American Tribes and groups is also included: Confederated Tribes of the Colville Reservation; Kootenai Tribe of Idaho; Spokane Tribe of Indians; Coeur d' Alene tribe

  12. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report Exhibits.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Volume is a part of the Final Environmental Impact Statement (EIS) for the Columbia River System. This volume contains technical exhibits of cultural resources and commentary on the (System Operation Review) SOR process. The Confederated Tribes of the Umatilla Indian Reservation comment is the majority of the material in the volume, in the Consultation Plan, Identification of trust resources; Criteria for the selection of a System Operating Strategy; comment on rights protection and implementation of Federal Trust responsibility; analysis of the draft EIS. Comment by other Native American Tribes and groups is also included: Confederated Tribes of the Colville Reservation; Kootenai Tribe of Idaho; Spokane Tribe of Indians; Coeur d` Alene tribe.

  13. Stochastic Methods Applied to Power System Operations with Renewable Energy: A Review

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Z. [Argonne National Lab. (ANL), Argonne, IL (United States); Liu, C. [Argonne National Lab. (ANL), Argonne, IL (United States); Electric Reliability Council of Texas (ERCOT), Austin, TX (United States); Botterud, A. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    Renewable energy resources have been rapidly integrated into power systems in many parts of the world, contributing to a cleaner and more sustainable supply of electricity. Wind and solar resources also introduce new challenges for system operations and planning in terms of economics and reliability because of their variability and uncertainty. Operational strategies based on stochastic optimization have been developed recently to address these challenges. In general terms, these stochastic strategies either embed uncertainties into the scheduling formulations (e.g., the unit commitment [UC] problem) in probabilistic forms or develop more appropriate operating reserve strategies to take advantage of advanced forecasting techniques. Other approaches to address uncertainty are also proposed, where operational feasibility is ensured within an uncertainty set of forecasting intervals. In this report, a comprehensive review is conducted to present the state of the art through Spring 2015 in the area of stochastic methods applied to power system operations with high penetration of renewable energy. Chapters 1 and 2 give a brief introduction and overview of power system and electricity market operations, as well as the impact of renewable energy and how this impact is typically considered in modeling tools. Chapter 3 reviews relevant literature on operating reserves and specifically probabilistic methods to estimate the need for system reserve requirements. Chapter 4 looks at stochastic programming formulations of the UC and economic dispatch (ED) problems, highlighting benefits reported in the literature as well as recent industry developments. Chapter 5 briefly introduces alternative formulations of UC under uncertainty, such as robust, chance-constrained, and interval programming. Finally, in Chapter 6, we conclude with the main observations from our review and important directions for future work.

  14. Operating Systems

    Indian Academy of Sciences (India)

    areas in which this type is useful are multimedia, virtual reality, and advanced scientific projects such as undersea exploration and planetary rovers. Because of the expanded uses for soft real-time functionality, it is finding its way into most current operating systems, including major versions of Unix and Windows NT OS.

  15. Columbia River System Operation Review final environmental impact statement. Appendix I: Power

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix discusses the work performed by the SOR Power Work Group. The Power Work Group (PWG) had several major responsibilities: first, to determine the effects of each of the various system operating strategies (SOS) on the Northwest regional power system; second, given these effects, to determine what, if any, actions are required to meet forecasted regional energy consumption; and finally, to estimate the cost for serving the forecasted regional energy consumption. The Northwest regional power system consists of Federal and non-Federal hydroelectric power projects (hydropower or hydro projects) on the main stem of the Columbia and Snake Rivers, numerous smaller hydro projects on other river reaches, and a number of thermal plants (coal, nuclear and combustion turbines)

  16. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.); United States. Bonneville Power Administration; United States. Army. Corps of Engineers. North Pacific Division; United States. Bureau of Reclamation. Pacific Northwest Region.

    1995-11-01

    The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement.

  17. Columbia River system operation review: Final environmental impact statement. Main report

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement

  18. Columbia River System Operation Review final environmental impact statement. Appendix K: Resident fish

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. In this appendix the Resident Fish Work Group (RFWG) has attempted to characterize and evaluate impacts of dam operation on an extremely complex and diverse integrated resource. Not only is this required under the National Environmental Policy Act (NEPA) for SOR, there are resident fish populations that have status under the Federal Endangered Species Act (ESA) or equivalent state regulations (Kootenai River white sturgeon, Snake River white sturgeon, sandroller, shorthead and torrent sculpins, bull trout, westslope cutthroat trout, redband trout, and burbot). The RFWG has also attempted to develop operating alternatives that benefit not only resident fish, but anadromous fish, wildlife, and other human interests as well. The authors have recognized the co-evolution of resident fish, anadromous fish, and other integrated resources in the basin

  19. Columbia River System Operation Review final environmental impact statement. Appendix Q: Regional forum

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The SOR is currently developing a System Operating Strategy (SOS) that will guide the physical operations of the Columbia River system. The SOR is also addressing the institutional arrangements that must be in place to make needed changes to the SOS in the future, or make interpretations of the strategy in the light of changing water conditions or river needs. For convenience, this future institutional arrangement is referred to as ''The Columbia River Regional Forum,'' or simply ''the Forum,'' even though the nature of this institution is still to be determined. This appendix and the Final Environmental Impact Statement (EIS) identify the Forum as an administrative process that will not result in impacts to the environment and will not require analysis in a NEPA context. The composition of and procedures followed by a decision making body cannot--in and of themselves--be used to predict a particular decision with definable impacts on the environment. Nevertheless, because of the relationship to the other SOR actions, the SOR lead agencies have prepared this Technical Appendix to provide opportunities for review and comment on the Forum alternatives

  20. Operational readiness review implementation plan for K Basin sludge water system

    International Nuclear Information System (INIS)

    IRWIN, R.M.

    2003-01-01

    This Implementation Plan (IP) has been prepared consistent with the requirements of U.S. Department of Energy (DOE) Order 425.1B, ''Startup and Restart of Nuclear Facilities'', and DOE-STD-3006-2000, ''Planning and Conduct of Operational Readiness Reviews'' (ORR) (DOE 2002). The scope of the DOE ORR is described in the RL ''Plan of Action, K Basin Sludge Water System'' (Veitenheimer 2003), prepared by DOE project line management and approved by the RL Manager, the designated Approval Authority, on March 20, 2003. The scope of the contractor ORR is described in the contractor ''Plan of Action for the K Basins Sludge Water System Operational Readiness Review'' (FH 2002a) which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on December 19, 2002. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated February 5, 2003 (Roberson 2003). This IP provides the overall approach and guidelines for performance of the DOE ORR. Appendix A contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  1. Improving the review of standard operating procedures: a novel electronic system for compounding pharmacies.

    Science.gov (United States)

    Brensel, Robert; Brensel, Scott; Ng, Amy

    2013-01-01

    Since the New England Compounding Center disaster in 2012, the importance of following correct procedures during every phase of customized pharmacy has been a focus of governmental interest and action as well as public scrutiny. Many pharmacies rely on the rote review of standard operating procedures to ensure that staff members understand and follow protocols that ensure the safety and potency of all compounds prepared, but that approach to continuing education can be cumbersome and needlessly time-consuming. In addition, documenting and retrieving evidence of employee competence can be difficult. In this article, we describe our use of online technology to improve our methods of educating staff about the full range of standard operating procedures that must be followed in our pharmacy. The system we devised and implemented has proven to be effective, easy to update and maintain, very inexpensive, and user friendly. Its use has reduced the time previously required for a read-over review of standard operating procedures from 30 or 40 minutes to 5 or 10 minutes in weekly staff meetings, and we can now easily document and access proof of employees' comprehension of that content. It is our hope that other small compounding pharmacies will also find this system of online standard operating procedure review helpful.

  2. Columbia River System Operation Review final environmental impact statement. Appendix H: Navigation

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The Navigation Technical Appendix presents the analysis of the various SOR alternatives in terms of their potential affects on the congressionally authorized navigation system within the Columbia and Snake river waterways. The focus of the study, impacts to the authorized navigation, improvements/developments, reflects on one of the continuing historical missions of the US Army Corps of Engineers: to promote safe commercial navigation of the nation's waterways benefiting the development of commerce within the US. The study and evaluation process involved Scoping, Screening and Full Scale Evaluation. During screening two models were developed; one was used to evaluate the effects of the various alternatives on navigation through the Snake River Projects and the other the effects on the Dworshak Pool. Full Scale Analysis was expanded to included a study of effects throughout the system

  3. Zebrafish housing systems: a review of basic operating principles and considerations for design and functionality.

    Science.gov (United States)

    Lawrence, Christian; Mason, Timothy

    2012-01-01

    The strategies for housing zebrafish used in biomedical research have evolved considerably over the past three decades. To keep pace with the rapid expansion and development of the zebrafish model system, the field has generally moved from keeping fish at the level of aquarium hobbyist to that of industrialized, recirculating aquaculture. Numerous commercial system vendors now offer increasingly sophisticated housing systems based on design principles that maximize the number of animals that can be housed in a given space footprint, and they are thus able to support large and diverse research programs. This review is designed to provide managers, lab animal veterinarians, investigators, and other parties responsible for care and use of these animals with a comprehensive overview of the basic operating and design principles of zebrafish housing systems. This information can be used to help plan the construction of new facilities and/or the upgrade and maintenance of existing operations.

  4. Review on Malaysian Rail Transit Operation and Management System: Issues and Solution in Integration

    Science.gov (United States)

    Masirin, Mohd Idrus Mohd; Salin, Aminah Mohd; Zainorabidin, Adnan; Martin, David; Samsuddin, Norshakina

    2017-08-01

    In any context, operation and management of transportation systems are key issues which may affect both life quality and economic development. In large urban agglomerations, an efficient public transportation system may help abate the negative externalities of private car use such as congestion, air and noise pollution, accident and fuel consumption, without excessively penalizing user travel times or zone accessibility. Thus, this study is conducted to appraise the Malaysian rural rail transit operation and management system, which are considered important as there are many issues and solution in integration of the services that need to be tackled more conscientiously. The purpose of this paper is to describe some of the most important issues on integration of services and rail transit system in Malaysian and how to solve or reduce these problems and conflicts. In this paper, it consists of the historical development of rail transit construction in Malaysia. This paper also attempts to identify the important issues related to rail transit services and integration in Malaysian rural rail operation and management system. Comparison is also conducted with other countries such as UK, France, and Japan. Finally, a critical analysis is presented in this paper by looking at the possible application for future Malaysian rail transit operation system and management, especially focusing on enhancing the quality of Malaysian rural rail transit. In conclusion, this paper is expected to successfully review and appraise the existing Malaysian rural rail transit operation and management system pertaining to issues & solution in integration. It is also hoped that reformation or transformation of present service delivery quality of the rail transit operation and management will enable Malaysia to succeed in transforming Malaysian transportation system to greater heights.

  5. Review of the total system related to operation of nuclear-powered ship

    International Nuclear Information System (INIS)

    Takamasa, Tomoji; Miyashita, Kunio

    2000-01-01

    It is essential to establish a marine reactor having excellent safety and reliability, which is capable of competing economically with conventional ships, and which can be accepted by international society, in order to be prepared for practical application of future nuclear-powered ships. For this purpose, it is important not only to demonstrate a marine reactor using a model or test device to simulate actual operation, but also to establish the environmental requirements for operation of a nuclear-powered ship, such as safety standards that are operationally and internationally common for ships, and to establish a repair base for nuclear-powered ships. Systems research for the practical application of nuclear-powered ships was conducted for five years, fiscal years 1992 through 1996, by a group in the Japan Atomic Energy Research Institute (JAERI), under the project title 'Review of the total system related to operation of nuclear-powered ships.' The project sought to summarize requirements for the practical application of nuclear-powered ships from the standpoint of the need side, e.g., what nuclear-powered ships will be requested, and what functions will be provided under the expected future social environment; to show a complete system concept for the operation of nuclear-powered ships; and to clarify the situations creating demand for nuclear-powered ships, as well as the system and environmental conditions to be established for operation of practical nuclear-powered ships. Study considerations included the size of the operation system for a nuclear-powered ship, a scenario for introducing a nuclear-powered container ship, and economic evolution from the effects on the whole shipping system, based on container ships, of introducing a nuclear-powered ship. The results of these considerations were made the framework for constructing an entire system and evaluating its economy. The treatment and disposal of radioactive waste from a nuclear-powered ship, and the

  6. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix D: Exhibits.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930`s, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D`Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation.

  7. The effects of operational and environmental variations on anaerobic wastewater treatment systems: a review

    Energy Technology Data Exchange (ETDEWEB)

    Leitao, R.C. [Embrapa Agroindustria Tropical (Brazilian Agricultural Research Corporation, Inst. of Tropical Agroindustry), Fortaleza (Brazil); Haandel, A.C. van [Federal University of Campina Grande (Brazil); Zeeman, G.; Lettinga, G. [Wageningen Univ. (Netherlands)

    2006-06-15

    With the aim of improving knowledge about the stability and reliability of anaerobic wastewater treatment systems, several researchers have studied the effects of operational or environmental variations on the performance of such reactors. In general, anaerobic reactors are affected by changes in external factors, but the severity of the effect is dependent upon the type, magnitude, duration and frequency of the imposed changes. The typical responses include a decrease in performance, accumulation of volatile fatty acids, drop in pH and alkalinity, change in biogas production and composition, and sludge washout. This review summarises the causes, types and effects of operational and environmental variation on anaerobic wastewater treatment systems. However, there still remain some unclear technical and scientific aspects that are necessary for the improvement of the stability and reliability of anaerobic processes. (author)

  8. The tokamak fusion test reactor tritium systems test contractor operational readiness review

    International Nuclear Information System (INIS)

    Gentile, C.A.; Levine, J.; Norris, M.; Rehill, F.; Such, C.

    1993-01-01

    In preparation for D-T operations at TFTR, the TFTR project has successfully completed the C-ORR process which has led to the introduction of 200 curies of tritium to the site. Preparations for the C-ORR began approximately 2 years ago. During July 1992 a one-week Site Assistance Review was conducted by the C-ORR , and C-ORR Team consisting of 12 persons, all of whom were outside experts, many of whom were from other facilities within the DOE complex. During the July 1992 Site Assistance Review 201 findings were documented which fell into one of three categories. All of the 109 category one findings which were generated were required to be resolved prior to the introduction of tritium to the TFTR site. On April 5, 1993, the TFTR Tritium System Test C-ORR commenced. The results of the C-ORR as documented in the final report by the C-ORR was that category 1 findings were resolved, and it was the recommendation of the C-ORR Team to the PPPL ES ampersand H Board that TFTR initiate the Tritium Systems Test. DOE (Chicago Operations, Princeton Area Office) concurred with the C-ORR final report and on April 29, 1993, at 12:15 pm tritium was introduced to the TFTR site

  9. A review of market monitoring activities at U.S. independent system operators

    Energy Technology Data Exchange (ETDEWEB)

    Lesieutre, Bernard C.; Goldman, Charles; Bartholomew, Emily

    2004-01-01

    Policymakers have increasingly recognized the structural impediments to effective competition in electricity markets, which has resulted in a renewed emphasis on the need for careful market design and market monitoring in wholesale and retail electricity markets. In this study, we review the market monitoring activities of four Independent System Operators in the United States, focusing on such topics as the organization of an independent market monitoring unit (MMU), the role and value of external market monitors, performance metrics and indices to aid in market analysis, issues associated with access to confidential market data, and market mitigation and investigation authority. There is consensus across the four ISOs that market monitoring must be organizationally independent from market participants and that ISOs should have authority to apply some degree of corrective actions on the market, though scope and implementation differ across the ISOs. Likewise, current practices regarding access to confidential market data by state energy regulators varies somewhat by ISO. Drawing on our interviews and research, we present five examples that illustrate the impact and potential contribution of ISO market monitoring activities to enhance functioning of wholesale electricity markets. We also discuss several key policy and implementation issues that Western state policymakers and regulators should consider as market monitoring activities evolve in the West.

  10. Reviewing operational experience feedback

    International Nuclear Information System (INIS)

    1991-04-01

    The purpose of this document is to provide detailed supplementary guidance to OSART experts to aid in the evaluation of operational experience feedback (OEF) programmes at nuclear power plants. The document begins by describing the objectives of an OEF programme. It goes on to indicate preparatory work and investigatory guidance for the expert. Section 5 describes attributes of an excellent OEF programme. Appended to these guidelines are examples of OEF documents from various plants. These are intended to help the expert by demonstrating the actual implementation of OEF in practice. These guidelines are in no way intended to conflict with existing national regulations and rules. A comprehensive OEF programme, as described in Section 2, would be impossible to evaluated in detail in the amount of time typically allocated for assessing OEF in an OSART review. The expert must use his or her time wisely by concentrating on those areas that appear to be the weakest

  11. Operating System Security

    CERN Document Server

    Jaeger, Trent

    2008-01-01

    Operating systems provide the fundamental mechanisms for securing computer processing. Since the 1960s, operating systems designers have explored how to build "secure" operating systems - operating systems whose mechanisms protect the system against a motivated adversary. Recently, the importance of ensuring such security has become a mainstream issue for all operating systems. In this book, we examine past research that outlines the requirements for a secure operating system and research that implements example systems that aim for such requirements. For system designs that aimed to

  12. Columbia River system operation review: Final environmental impact statement. Appendix R, Pacific Northwest Coordination agreement (PNCA)

    International Nuclear Information System (INIS)

    1995-11-01

    Currently, the Federal government coordinates the planning and operation of the Federal Columbia River Power System (FCRPS) with projects owned and operated by the region's non-Federal hydrogenerating utilities pursuant to the Pacific North-west Coordination Agreement (PNCA). The Bureau of Reclamation (Reclamation), the Corps of Engineers (Corps), and the Bonneville Power Administration (BPA) are parties to the PNCA on behalf of the government of the United States. The PNCA is a complex agreement that provides an opportunity for the region's power producers to maximize the power system's reliability and economy while meeting their multiple-use objectives. The PNCA does not dictate the operation of the resources it coordinates. It is essentially an accounting mechanism that exchanges the power produced among the parties in order to improve the reliability of the system and reduce regional power costs. Project owners retain complete autonomy to operate as needed to meet their multiple-use requirements. The PNCA was executed in 1964 as an important component of regional plans to maximize the Northwest's hydro resource capability. Maximization also included the development of storage projects on the Columbia River in Canada pursuant to the terms of the 1964 Columbia River Treaty. Because of the link between power coordination and Treaty issues, the current parties to the PNCA, currently are contemplating entering into a replacement or renewed power coordination agreement. Because the power coordination agreement is a consensual arrangement, its ultimate provisions must be acceptable to all of its signatories. This Appendix R to the Final Environmental Impact Statement of the Columbia River System is a presentation of the Pacific North-west Coordination Agreement

  13. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix N: Wildlife.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included.

  14. Columbia River system operation review: Final environmental impact statement. Appendix N, wildlife

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included

  15. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix O: Economic and Social Impact.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Appendix O of the Final Environmental Impact Statement for the Columbia River System measures the economic and social effects of the alternative system operation strategies and includes both geographic and methodology components. Areas discussed in detail include the following: purpose, scope and process; an economic history of the Columbia River Basin and its use today including the Columbia River and Socio-economic development in the Northwest and Major uses of the River System; Analysis procedures and methodologies including national economic evaluation, the concepts, analysis of assumptions, analysis for specific river uses, water quality, Regional evaluation, analysis, and social impacts; alternatives and impacts including implementation costs, andromous fish, resident fish and wildlife, flood control, irrigation and municipal and industrial water supply, navigation impacts, power, recreation, annual costs, regional economic analysis. Extensive comparison of alternatives is included.

  16. Columbia River system operation review: Final environmental impact statement. Appendix O, economic and social impact

    International Nuclear Information System (INIS)

    1995-11-01

    This Appendix O of the Final Environmental Impact Statement for the Columbia River System measures the economic and social effects of the alternative system operation strategies and includes both geographic and methodology components. Areas discussed in detail include the following: purpose, scope and process; an economic history of the Columbia River Basin and its use today including the Columbia River and Socio-economic development in the Northwest and Major uses of the River System; Analysis procedures and methodologies including national economic evaluation, the concepts, analysis of assumptions, analysis for specific river uses, water quality, Regional evaluation, analysis, and social impacts; alternatives and impacts including implementation costs, andromous fish, resident fish and wildlife, flood control, irrigation and municipal and industrial water supply, navigation impacts, power, recreation, annual costs, regional economic analysis. Extensive comparison of alternatives is included

  17. Lessons Learned From the Development, Operation, and Review of Mechanical Systems on the Space Shuttle, International Space Station, and Payloads

    Science.gov (United States)

    Dinsel, Alison; Jermstad, Wayne; Robertson, Brandan

    2006-01-01

    The Mechanical Design and Analysis Branch at the Johnson Space Center (JSC) is responsible for the technical oversight of over 30 mechanical systems flying on the Space Shuttle Orbiter and the International Space Station (ISS). The branch also has the responsibility for reviewing all mechanical systems on all Space Shuttle and International Space Station payloads, as part of the payload safety review process, through the Mechanical Systems Working Group (MSWG). These responsibilities give the branch unique insight into a large number of mechanical systems, and problems encountered during their design, testing, and operation. This paper contains narrative descriptions of lessons learned from some of the major problems worked on by the branch during the last two years. The problems are grouped into common categories and lessons learned are stated.

  18. Systemic review: Radiation therapy alone in medical non-operable endometrial carcinoma.

    Science.gov (United States)

    van der Steen-Banasik, E; Christiaens, M; Shash, E; Coens, C; Casado, A; Herrera, F G; Ottevanger, P B

    2016-09-01

    Radiotherapy is a good option for inoperable and frail patients diagnosed with endometrial cancer. Because of the lack of large multicentre trials, a systematic review was performed in an attempt to get an overview on the feasibility and efficacy of this specific approach. We performed a bibliographic search for articles in English or French which were published in PubMed from the start of this database in January 1969 to identify publications on radiation therapy (RT) as single treatment for localised non-operable carcinoma of the endometrium. The review was completed following the preferred reporting items for systematic reviews and meta-analyses (PRISMA) guidelines. Twenty-five reports containing 2694 patients treated with RT as single treatment were identified that fulfilled the selection criteria. Disease-specific survival (DSS) at 5 years was reported for a cohort of 1322 (49.1%) patients. The combined DSS for this group of patients was 78.5% (range: 68.4-92%; 95% confidence interval: 74.5-82.5). External beam radiation therapy (EBRT) combined with brachytherapy (BT) was used in 1278 patients (47.4%), BT alone in 1383 patients (51.3%), and EBRT alone in 33 patients (1.2%). The average occurrence of grade III or worse late toxicity was 3.7% for EBRT + BT, 2.8% for BT alone, and 1.2% for EBRT alone. RT is in terms of disease control and toxicity, an acceptable option for non-surgical candidate patients. Prospective multicentre randomised or observational trials are needed to validate these results. Copyright © 2016 Elsevier Ltd. All rights reserved.

  19. The Effects of Degraded Digital Instrumentation and Control Systems on Human-system Interfaces and Operator Performance: HFE Review Guidance and Technical Basis

    Energy Technology Data Exchange (ETDEWEB)

    O' Hara, J.M.; W. Gunther, G. Martinez-Guridi

    2010-02-26

    New and advanced reactors will use integrated digital instrumentation and control (I&C) systems to support operators in their monitoring and control functions. Even though digital systems are typically highly reliable, their potential for degradation or failure could significantly affect operator performance and, consequently, impact plant safety. The U.S. Nuclear Regulatory Commission (NRC) supported this research project to investigate the effects of degraded I&C systems on human performance and plant operations. The objective was to develop human factors engineering (HFE) review guidance addressing the detection and management of degraded digital I&C conditions by plant operators. We reviewed pertinent standards and guidelines, empirical studies, and plant operating experience. In addition, we conducted an evaluation of the potential effects of selected failure modes of the digital feedwater system on human-system interfaces (HSIs) and operator performance. The results indicated that I&C degradations are prevalent in plants employing digital systems and the overall effects on plant behavior can be significant, such as causing a reactor trip or causing equipment to operate unexpectedly. I&C degradations can impact the HSIs used by operators to monitor and control the plant. For example, sensor degradations can make displays difficult to interpret and can sometimes mislead operators by making it appear that a process disturbance has occurred. We used the information obtained as the technical basis upon which to develop HFE review guidance. The guidance addresses the treatment of degraded I&C conditions as part of the design process and the HSI features and functions that support operators to monitor I&C performance and manage I&C degradations when they occur. In addition, we identified topics for future research.

  20. The Effects of Degraded Digital Instrumentation and Control Systems on Human-system Interfaces and Operator Performance: HFE Review Guidance and Technical Basis

    International Nuclear Information System (INIS)

    O'Hara, J.M.; Gunther, W.; Martinez-Guridi, G.

    2010-01-01

    New and advanced reactors will use integrated digital instrumentation and control (I and C) systems to support operators in their monitoring and control functions. Even though digital systems are typically highly reliable, their potential for degradation or failure could significantly affect operator performance and, consequently, impact plant safety. The U.S. Nuclear Regulatory Commission (NRC) supported this research project to investigate the effects of degraded I and C systems on human performance and plant operations. The objective was to develop human factors engineering (HFE) review guidance addressing the detection and management of degraded digital I and C conditions by plant operators. We reviewed pertinent standards and guidelines, empirical studies, and plant operating experience. In addition, we conducted an evaluation of the potential effects of selected failure modes of the digital feedwater system on human-system interfaces (HSIs) and operator performance. The results indicated that I and C degradations are prevalent in plants employing digital systems and the overall effects on plant behavior can be significant, such as causing a reactor trip or causing equipment to operate unexpectedly. I and C degradations can impact the HSIs used by operators to monitor and control the plant. For example, sensor degradations can make displays difficult to interpret and can sometimes mislead operators by making it appear that a process disturbance has occurred. We used the information obtained as the technical basis upon which to develop HFE review guidance. The guidance addresses the treatment of degraded I and C conditions as part of the design process and the HSI features and functions that support operators to monitor I and C performance and manage I and C degradations when they occur. In addition, we identified topics for future research.

  1. EMSL 2008 Operational Review

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, Allison A.

    2008-08-12

    The William R. Wiley Environmental Molecular Sciences Laboratory (EMSL) is a national user facility that contains state-of-the-art instrumentation and expert resources available for use by researchers from academia, industry, and the national laboratory system. The facility is supported by the U.S. Department of Energy’s (DOE) Biological and Environmental Research Program, but the research conducted within the facility benefits many funding agencies, including other branches of DOE, the National Institutes of Health, the National Science Foundation, and the Department of Defense. EMSL requires the continued funding and support of its stakeholders and clients to continue to grow its mission, build its reputation as a sought-after national user facility with cutting-edge capabilities, and attract high-profile users who will work to solve the most critical scientific challenges that affect DOE and the nation. In this vein, this document has been compiled to provide these stakeholders and clients with a review document that provides an abundance of information on EMSL’s history, current research activities, and proposed future direction.

  2. 78 FR 77484 - Extension of Agency Information Collection Activity Under OMB Review: Pipeline System Operator...

    Science.gov (United States)

    2013-12-23

    ... partners and relevant industry stakeholders. Additionally, to facilitate the exchange of security information in a timely fashion, contact data is necessary for pipeline operators' security operations or...

  3. Operating System Abstraction Layer (OSAL)

    Science.gov (United States)

    Yanchik, Nicholas J.

    2007-01-01

    This viewgraph presentation reviews the concept of the Operating System Abstraction Layer (OSAL) and its benefits. The OSAL is A small layer of software that allows programs to run on many different operating systems and hardware platforms It runs independent of the underlying OS & hardware and it is self-contained. The benefits of OSAL are that it removes dependencies from any one operating system, promotes portable, reusable flight software. It allows for Core Flight software (FSW) to be built for multiple processors and operating systems. The presentation discusses the functionality, the various OSAL releases, and describes the specifications.

  4. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix D: Cultural Resources.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This study attempts to identify and analyze the impacts of the System Operating Strategy (SOS) alternatives on cultural resources. The impacts include effects on Native American traditional cultural values, properties and practices. They also include effects on archeological or historic properties meeting the criteria of the National Register of Historic Places. In addition to responding to the requirements of the National Environmental Policy Act (NEPA), this analysis addresses the requirements of the National Historic Preservation Act (NHPA), the Archeological Resources Protection Act (ARPA), the Native American Graves Protection and Repatriation Act (NAGPRA), the Native American Religious Freedom Act (NARFA), and other relevant legislation. To meet their legally mandated cultural resources requirements, the SOR agencies will develop agreements and Implementation Plans with the appropriate State Historic Preservation Officers (SHPOs), Tribes, and the Advisory Council on Historic Preservation (ACHP) detailing the measures necessary to best manage the resource. The planning and implementation activities will be staged over a number of years in consultation with affected Tribes.

  5. Autonomous Systems and Operations

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Autonomous Systems and Operations (ASO) project will develop an understanding of the impacts of increasing communication time delays on mission operations,...

  6. Operations management system

    Science.gov (United States)

    Brandli, A. E.; Eckelkamp, R. E.; Kelly, C. M.; Mccandless, W.; Rue, D. L.

    1990-01-01

    The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.

  7. Operation auxiliary system (SAO)

    International Nuclear Information System (INIS)

    Lolich, J.; Santome, D.; Drexler, J.

    1990-01-01

    This work presents an auxiliary system for nuclear power plants operation (SAO). The development purpose consisted in a computing supervision system to be installed at different sites of a reactor, mainly in the control room. The inclusion of this system to a nuclear power plant minimizes the possibility of human error for the facility operation. (Author) [es

  8. Network operating system

    Science.gov (United States)

    1985-01-01

    Long-term and short-term objectives for the development of a network operating system for the Space Station are stated. The short-term objective is to develop a prototype network operating system for a 100 megabit/second fiber optic data bus. The long-term objective is to establish guidelines for writing a detailed specification for a Space Station network operating system. Major milestones are noted. Information is given in outline form.

  9. Operating system MINIX

    OpenAIRE

    JIRKŮ, Radek

    2012-01-01

    This thesis introduces readers to the MINIX operating system, which was used in the creation of the Linux OS. It discusses the history and development of the system and explains its core and the file system. Also solves MINIX installation and configuration of the virtual machine at each step and deals with disputes that had a creator of Minix creator of Linux. In conclusion, compared with Linux MINIX and summarizes the advantages and disadvantages and the use of the operating system at present.

  10. Systemic review: Radiation therapy alone in medical non-operable endometrial carcinoma

    NARCIS (Netherlands)

    Steen-Banasik, E. van der; Christiaens, M.; Shash, E.; Coens, C.; Casado, A.; Herrera, F.G.; Ottevanger, P.B.

    2016-01-01

    BACKGROUND AND PURPOSE: Radiotherapy is a good option for inoperable and frail patients diagnosed with endometrial cancer. Because of the lack of large multicentre trials, a systematic review was performed in an attempt to get an overview on the feasibility and efficacy of this specific approach.

  11. Screening Analysis : Volume 2, Impact Results (Columbia River System Operation Review).

    Energy Technology Data Exchange (ETDEWEB)

    1992-06-01

    Detailed results from all of the work groups are presented in this chapter. Ninety alternatives were analyzed during the screening process. Three of the alternative represent various base cases and are used for comparison purposes. The other 87 alternatives represent a wide variety of operational possibilities ranging from current operations to emphasizing a single river use to compromise operations that attempt to accommodate the multiple uses. Every possible alternative suggested during the screening phase was considered. Each alternative was given an abbreviated name, a number and assigned by ROSE to either the Corps (C) or BPA (B) for hydroregulation modeling. A list of the alternatives with its number and hydroregulation assignment is given below. The results in this chapter are presented in numerical order. The first 3 letters in the name identify which work group suggested the alternative. The format for the results includes a brief description of each alternative, a tabulation of the screening calculations organized by work group, and observations/comments on the alternative by the work groups. The description summarizes the key operational requirements for the alternative and was taken directly from the instructions given to the hydroregulation modelers.

  12. The Linux Operating System

    Indian Academy of Sciences (India)

    and includes virtual memory, shared libraries, demand loading, ... Memory Management is a scheme by which an operating system shares the memory in a computer ..... Suggested Reading and Websites. [1] Andrew S Tannenbaum and Albert S Woodhull,. Operating Systems: Design and Implementation,. Second Edition ...

  13. Distributed Operating Systems

    NARCIS (Netherlands)

    Tanenbaum, A.S.; van Renesse, R.

    1985-01-01

    Distributed operating systems have many aspects in common with centralized ones, but they also differ in certain ways. This paper is intended as an introduction to distributed operating systems, and especially to current university research about them. After a discussion of what constitutes a

  14. Modern operating systems

    CERN Document Server

    Tanenbaum, Andrew S

    2015-01-01

    Modern Operating Systems, Fourth Edition, is intended for introductory courses in Operating Systems in Computer Science, Computer Engineering, and Electrical Engineering programs. It also serves as a useful reference for OS professionals ' The widely anticipated revision of this worldwide best-seller incorporates the latest developments in operating systems (OS) technologies. The Fourth Edition includes up-to-date materials on relevant'OS. Tanenbaum also provides information on current research based on his experience as an operating systems researcher. ' Modern Operating Systems, Third Editionwas the recipient of the 2010 McGuffey Longevity Award. The McGuffey Longevity Award recognizes textbooks whose excellence has been demonstrated over time.'http://taaonline.net/index.html " Teaching and Learning Experience This program will provide a better teaching and learning experience-for you and your students. It will help: ' *Provide Practical Detail on the Big Picture Concepts: A clear and entertaining writing s...

  15. The Linux Operating System

    Indian Academy of Sciences (India)

    Linux Distributions. Linux per se refers only to the kernel of the operating system. A full fledged Unix system however requires a set of applications and support software that make the system user friendly. Hundreds of programmers around the world ,have contributed to bring the Linux system to its current state of robustness.

  16. Microkernel operating systems

    OpenAIRE

    Rudić, Ratko

    2016-01-01

    This thesis outlines history, development and design of microkernel based operating systems. While the idea of microkernel based architecture emerged early in computer science, there are still very few systems adopting this technology. Microkernel operating systems are divided into several different groups and families that frequently share rules, design decisions and development processes. This master thesis focuses on the main representatives of these groups as well as their mutual...

  17. Columbia River system operation review. Final environmental impact statement. Appendix J, recreation

    International Nuclear Information System (INIS)

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts

  18. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix J: Recreation.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts.

  19. High Performance Computing Operations Review Report

    Energy Technology Data Exchange (ETDEWEB)

    Cupps, Kimberly C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-12-19

    The High Performance Computing Operations Review (HPCOR) meeting—requested by the ASC and ASCR program headquarters at DOE—was held November 5 and 6, 2013, at the Marriott Hotel in San Francisco, CA. The purpose of the review was to discuss the processes and practices for HPC integration and its related software and facilities. Experiences and lessons learned from the most recent systems deployed were covered in order to benefit the deployment of new systems.

  20. Computer system operation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Young Jae; Lee, Hae Cho; Lee, Ho Yeun; Kim, Young Taek; Lee, Sung Kyu; Park, Jeong Suk; Nam, Ji Wha; Kim, Soon Kon; Yang, Sung Un; Sohn, Jae Min; Moon, Soon Sung; Park, Bong Sik; Lee, Byung Heon; Park, Sun Hee; Kim, Jin Hee; Hwang, Hyeoi Sun; Lee, Hee Ja; Hwang, In A. [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    The report described the operation and the trouble shooting of main computer and KAERINet. The results of the project are as follows; 1. The operation and trouble shooting of the main computer system. (Cyber 170-875, Cyber 960-31, VAX 6320, VAX 11/780). 2. The operation and trouble shooting of the KAERINet. (PC to host connection, host to host connection, file transfer, electronic-mail, X.25, CATV etc.). 3. The development of applications -Electronic Document Approval and Delivery System, Installation the ORACLE Utility Program. 22 tabs., 12 figs. (Author) .new.

  1. Distributed Operating Systems

    NARCIS (Netherlands)

    Mullender, Sape J.

    1987-01-01

    In the past five years, distributed operating systems research has gone through a consolidation phase. On a large number of design issues there is now considerable consensus between different research groups. In this paper, an overview of recent research in distributed systems is given. In turn, the

  2. Disc operational system

    International Nuclear Information System (INIS)

    Veretenov, V.Yu.; Volkov, A.I.; Gurevich, M.I.; Kozik, V.S.; Pod'yachev, E.I.; Shapiro, M.L.

    1974-01-01

    A disc operational system is proposed, which is based on the file structure and designed for use in a BESM-6 computer with the software system comprising a dispatcher DD-73 and a monitor 'Dubna'. The main distinguishing feature of the disc operational system is the decentralization of the file system. Each disc package is an independent file unaffected by the state of the other disc packages. The use of several disc packages is allowed. The above feature of the disc operational system makes it possible to simplify the language of communication with the system, to give the user the opportunity of controlling the file quite independently, and to simplify the maintenance of the discs by the computer personnel. One and the same disc can be simultaneously addressed by all problems in the processor (both mathematical and service). A single file, however, may be used in the recording mode by only one problem. The description presented is the instruction for users. It also describes special possibilities open to the system programmers [ru

  3. Operating system BSD

    OpenAIRE

    ĎURKOV, Milan

    2012-01-01

    This bachelor?s thesis gives an overview of the operating system BSD Unix. The theoretical part of the work describes the history, the present and the basic information about the single distributions of this system. It also describes characteristics of the BSD kernel and natively used filesystem UFS which also compares with the Linux filesystem Ext4. The work also comprises description of the BSD license and its comparison with the GNU GPL license. The practical part of the thesis then descri...

  4. Access control system operation

    International Nuclear Information System (INIS)

    Barnes, L.D.

    1981-06-01

    An automated method for the control and monitoring of personnel movement throughout the site was developed under contract to the Department of Energy by Allied-General Nuclear Services (AGNS) at the Barnwell Nuclear Fuel Plant (BNFP). These automated features provide strict enforcement of personnel access policy without routine patrol officer involvement. Identification methods include identification by employee ID number, identification by voice verification and identification by physical security officer verification. The ability to grant each level of access authority is distributed over the organization to prevent any single individual at any level in the organization from being capable of issuing an authorization for entry into sensitive areas. Each access event is recorded. As access events occur, the inventory of both the entered and the exited control area is updated so that a current inventory is always available for display. The system has been operated since 1979 in a development mode and many revisions have been implemented in hardware and software as areas were added to the system. Recent changes have involved the installation of backup systems and other features required to achieve a high reliability. The access control system and recent operating experience are described

  5. Pyrolaser Operating System

    Science.gov (United States)

    Roberts, Floyd E., III

    1994-01-01

    Software provides for control and acquisition of data from optical pyrometer. There are six individual programs in PYROLASER package. Provides quick and easy way to set up, control, and program standard Pyrolaser. Temperature and emisivity measurements either collected as if Pyrolaser in manual operating mode or displayed on real-time strip charts and stored in standard spreadsheet format for posttest analysis. Shell supplied to allow macros, which are test-specific, added to system easily. Written using Labview software for use on Macintosh-series computers running System 6.0.3 or later, Sun Sparc-series computers running Open-Windows 3.0 or MIT's X Window System (X11R4 or X11R5), and IBM PC or compatible computers running Microsoft Windows 3.1 or later.

  6. Operational readiness review phase-1 final report for WRAP-1

    Energy Technology Data Exchange (ETDEWEB)

    Bowen, W., Westinghouse Hanford

    1996-12-27

    This report documents the Operational Readiness Review for WRAP-1 Phase-1 operations. The report includes all criteria, lines of inquiry with resulting Findings and Observations. The review included assessing operational capability of the organization and the computer controlled process and facility systems.

  7. Operating systems. [of computers

    Science.gov (United States)

    Denning, P. J.; Brown, R. L.

    1984-01-01

    A counter operating system creates a hierarchy of levels of abstraction, so that at a given level all details concerning lower levels can be ignored. This hierarchical structure separates functions according to their complexity, characteristic time scale, and level of abstraction. The lowest levels include the system's hardware; concepts associated explicitly with the coordination of multiple tasks appear at intermediate levels, which conduct 'primitive processes'. Software semaphore is the mechanism controlling primitive processes that must be synchronized. At higher levels lie, in rising order, the access to the secondary storage devices of a particular machine, a 'virtual memory' scheme for managing the main and secondary memories, communication between processes by way of a mechanism called a 'pipe', access to external input and output devices, and a hierarchy of directories cataloguing the hardware and software objects to which access must be controlled.

  8. Reactor operating system

    International Nuclear Information System (INIS)

    Maruyama, Hiromi; Izumi, Masayuki; Uchikawa, Sadao; Takeda, Renzo.

    1979-01-01

    Purpose: In a bwr type reactor, to improve mainly the radial power distribution by control rods. Method: Control rods located successively at the outer parts are divided into N (N=1, 2 ...) groups, for example, control rods located at the center of the core forming a first group, those located at further outer side of said group forming a second group, and those located at further outer side of said second group forming a third group. Among control rods belonging to alternative groups, those mutually in positions of a knight in chess are selected, and inserted in the core. According to the present system, the operation having such thermal allowance as about 4% in the maximum linear output density and about 2% in the minimum critical output ratio becomes possible as compared with the prior art system. (Kamimura, M.)

  9. Current and Future Flight Operating Systems

    Science.gov (United States)

    Cudmore, Alan

    2007-01-01

    This viewgraph presentation reviews the current real time operating system (RTOS) type in use with current flight systems. A new RTOS model is described, i.e. the process model. Included is a review of the challenges of migrating from the classic RTOS to the Process Model type.

  10. Vessel Operator System

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Operator cards are required for any operator of a charter/party boat and or a commercial vessel (including carrier and processor vessels) issued a vessel permit from...

  11. Personal computer and workstation operating systems tutorial

    OpenAIRE

    Frame, Charles E.

    1994-01-01

    This thesis is a review and analysis of personal computer and workstation operating systems. The emphasis is placed on UNIX, MS DOS, MS windows and OS/2 operating systems. UNIX is cover under the U.S. Government POSIX standard, which dictates its use when practical. MS DOS is the most used operating system worldwide. OS/2 was developed to combat some of the shortcomings of MS DOS. Each operating system which is discussed has a design philosophy that fulfills specific user's needs. UNIX was de...

  12. High-Performance Operating Systems

    DEFF Research Database (Denmark)

    Sharp, Robin

    1999-01-01

    Notes prepared for the DTU course 49421 "High Performance Operating Systems". The notes deal with quantitative and qualitative techniques for use in the design and evaluation of operating systems in computer systems for which performance is an important parameter, such as real-time applications......, communication systems and multimedia systems....

  13. Columbia River System Operation Review final environmental impact statement. Appendix S: U.S. Fish and Wildlife Service Coordination Act Report

    International Nuclear Information System (INIS)

    1995-11-01

    This document constitutes the report of the US Fish and Wildlife Service (FWS) relating to the proposed Columbia River System Operation Review (SOR). The SOR proposed alternative consists of a number of specific water management manipulations and new management targets for operating the network of existing Federal Columbia River Power System dams and facilities. This report, therefore, presents a broader, ecosystem planning and management approach for evaluating and resolving those operational and biological uncertainties. Potential mitigation, enhancement and restoration actions associated with the preferred alternative will require an adaptive implementation approach. At the present time and as further changes anticipated in SOR operations occur, the complete, ecosystemwide, synergistic effects of the operation of the current Federal Columbia River Power System cannot be adequately ascertained. However, the initial elements of ecosystem-based remedies are presented in Sections 4 and 5 of this report. These remedies are intended to stimulate action to help conserve distressed fish and wildlife populations, while furthering understanding of the impacts of the SOR preferred alternative on the ecosystem. This Coordination Act Report is the first attempt to integrate fish and wildlife mitigation, enhancement, recovery and restoration needs with the proposed action and the existing Federal Columbia River Power System

  14. Operational expert system applications in Europe

    CERN Document Server

    Zarri, Gian Piero

    1992-01-01

    Operational Expert System Applications in Europe describes the representative case studies of the operational expert systems (ESs) that are used in Europe.This compilation provides examples of operational ES that are realized in 10 different European countries, including countries not usually examined in the standard reviews of the field.This book discusses the decision support system using several artificial intelligence tools; expert systems for fault diagnosis on computerized numerical control (CNC) machines; and expert consultation system for personal portfolio management. The failure prob

  15. A Multiprocessor Operating System Simulator

    Science.gov (United States)

    Johnston, Gary M.; Campbell, Roy H.

    1988-01-01

    This paper describes a multiprocessor operating system simulator that was developed by the authors in the Fall semester of 1987. The simulator was built in response to the need to provide students with an environment in which to build and test operating system concepts as part of the coursework of a third-year undergraduate operating systems course. Written in C++, the simulator uses the co-routine style task package that is distributed with the AT&T C++ Translator to provide a hierarchy of classes that represents a broad range of operating system software and hardware components. The class hierarchy closely follows that of the 'Choices' family of operating systems for loosely- and tightly-coupled multiprocessors. During an operating system course, these classes are refined and specialized by students in homework assignments to facilitate experimentation with different aspects of operating system design and policy decisions. The current implementation runs on the IBM RT PC under 4.3bsd UNIX.

  16. SPECTR System Operational Test Report

    International Nuclear Information System (INIS)

    Landman, W.H. Jr.

    2011-01-01

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  17. Transportation System Concept of Operations

    Energy Technology Data Exchange (ETDEWEB)

    N. Slater-Thompson

    2006-08-16

    The Nuclear Waste Policy Act of 1982 (NWPA), as amended, authorized the DOE to develop and manage a Federal system for the disposal of SNF and HLW. OCRWM was created to manage acceptance and disposal of SNF and HLW in a manner that protects public health, safety, and the environment; enhances national and energy security; and merits public confidence. This responsibility includes managing the transportation of SNF and HLW from origin sites to the Repository for disposal. The Transportation System Concept of Operations is the core high-level OCRWM document written to describe the Transportation System integrated design and present the vision, mission, and goals for Transportation System operations. By defining the functions, processes, and critical interfaces of this system early in the system development phase, programmatic risks are minimized, system costs are contained, and system operations are better managed, safer, and more secure. This document also facilitates discussions and understanding among parties responsible for the design, development, and operation of the Transportation System. Such understanding is important for the timely development of system requirements and identification of system interfaces. Information provided in the Transportation System Concept of Operations includes: the functions and key components of the Transportation System; system component interactions; flows of information within the system; the general operating sequences; and the internal and external factors affecting transportation operations. The Transportation System Concept of Operations reflects OCRWM's overall waste management system policies and mission objectives, and as such provides a description of the preferred state of system operation. The description of general Transportation System operating functions in the Transportation System Concept of Operations is the first step in the OCRWM systems engineering process, establishing the starting point for the lower

  18. Review of operational aids for nuclear plant operators

    International Nuclear Information System (INIS)

    Kisner, R.A.

    1983-01-01

    Many approaches are being explored to improve the safety of nuclear plant operations. One approach is to supply high-quality, relevant information by means of computer-based diagnostic systems to assist plant operators in performing their operational and safety-related roles. The evaluation of operational aids to ensure safe plant operations is a necessary function of NRC. This work has two purposes: to collect limited data on a diversity of operational aids, and to provide a method for evaluating the safety implications of the functions of proposed operational aids. After a discussion of the method evaluation now under study, this paper outlines this data collection to date

  19. Operating experience and systems analysis at Trillo NPP: A program intended for systematic review of plant safety systems to assess design basis requirements compliance

    International Nuclear Information System (INIS)

    Vega, R. de la

    1996-01-01

    The program was defined to apply to all plant safety systems and/or systems included in plant Technical Specifications. The goal of the program was to ensure, by systematic design, construction, and commissioning review, the adequacy of safety systems, structures and components to fulfill their safety functions. Also, as a result of the program, it was established that a complete, unambiguous, systematic, design basis definition shall take place. And finally, a complete documental review of the plant design shall result from the program execution

  20. Review of operational aspects of initial experiments utilizing the U.S. MLS. [microwave landing system effectiveness

    Science.gov (United States)

    Walsh, T. M.; Morello, S. A.; Reeder, J. P.

    1976-01-01

    An exercise to support the Federal Aviation Administration in demonstrating the U.S. candidate for an international microwave landing system (MLS) was conducted by NASA. During this demonstration the MLS was utilized to provide the TCV Boeing 737 research airplane with guidance for automatic control during transition from conventional RNAV to MLS RNAV in curved, descending flight; flare; touchdown; and roll-out. Flight profiles, system configuration, displays, and operating procedures used in the demonstration are described, and preliminary results of flight data analysis are discussed. Recent experiences with manually controlled flight in the NAFEC MLS environment are also discussed. The demonstration shows that in automatic three-dimensional flight, the volumetric signal coverage of the MLS can be exploited to enable a commercial carrier class airplane to perform complex curved, descending paths with precision turns into short final approaches terminating in landing and roll-out, even when subjected to strong and gusty tail and cross wind components and severe wind shear.

  1. The embedded operating system project

    Science.gov (United States)

    Campbell, R. H.

    1984-01-01

    This progress report describes research towards the design and construction of embedded operating systems for real-time advanced aerospace applications. The applications concerned require reliable operating system support that must accommodate networks of computers. The report addresses the problems of constructing such operating systems, the communications media, reconfiguration, consistency and recovery in a distributed system, and the issues of realtime processing. A discussion is included on suitable theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based systems. In particular, this report addresses: atomic actions, fault tolerance, operating system structure, program development, reliability and availability, and networking issues. This document reports the status of various experiments designed and conducted to investigate embedded operating system design issues.

  2. Tritium Room Air Monitor Operating Experience Review

    Energy Technology Data Exchange (ETDEWEB)

    L. C. Cadwallader; B. J. Denny

    2008-09-01

    Monitoring the breathing air in tritium facility rooms for airborne tritium is a radiological safety requirement and a best practice for personnel safety. Besides audible alarms for room evacuation, these monitors often send signals for process shutdown, ventilation isolation, and cleanup system actuation to mitigate releases and prevent tritium spread to the environment. Therefore, these monitors are important not only to personnel safety but also to public safety and environmental protection. This paper presents an operating experience review of tritium monitor performance on demand during small (1 mCi to 1 Ci) operational releases, and intentional airborne inroom tritium release tests. The tritium tests provide monitor operation data to allow calculation of a statistical estimate for the reliability of monitors annunciating in actual tritium gas airborne release situations. The data show a failure to operate rate of 3.5E-06/monitor-hr with an upper bound of 4.7E-06, a failure to alarm on demand rate of 1.4E-02/demand with an upper bound of 4.4E-02, and a spurious alarm rate of 0.1 to 0.2/monitor-yr.

  3. Operation Safety Review of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Suharno

    2005-01-01

    A review on operation safety of Nuclear Power Plant (NPP) is carried out. NPP is established through several phases that are siting, design, fabrication and construction, and after completion of construction the next phase is operation, therefore operating organization is established. The safety of NPP is relied on operation safety. Based on that case the aim of this review is to get impression that operating organization and its activities are very important on determining the achievement of operation safety. Operating organization determines qualification and training of personnel, commissioning programs, plant operation programs, and supporting activities programs. The method used in this review is by explains the operating organization and its activities. The results indicate that the role of operating organization and its activities are very important on determining the achievement of the goals of the operation which are secure, reliable and safe. Operating organization directly responsible to operation safety. Besides that, human factor related to the implementation of safety culture has also important role. (author)

  4. Disk Operating System User's Guide

    Science.gov (United States)

    1972-05-01

    This document serves the purpose of bringing together in one place most of the information a user needs to use the DDP-516 Disk Operating System, (DOS). DOS is a core resident, one user, console-oriented operating system which allows the user to cont...

  5. GODAE Systems in Operation

    Science.gov (United States)

    2009-10-09

    management, and ecotourism , as well as a number of recreational activities such as ocean-going yacht racing and beach swimming. The system also...systems. Hernandez et al. (2009) give a more exhaustive presentation of this the real ocean as observed. Figure 1 shows the innovation root mean ...Root Mean Square of SLA, cm 11 i i i i i i i 11 5.20- 4.80 -’ 4.40 4.00 3.60 3.20 1111111111 rt I(I tutttimf TMT Ttttl I l|t M 1 t I I I I I

  6. The embedded operating system project

    Science.gov (United States)

    Campbell, R. H.

    1985-01-01

    The design and construction of embedded operating systems for real-time advanced aerospace applications was investigated. The applications require reliable operating system support that must accommodate computer networks. Problems that arise in the construction of such operating systems, reconfiguration, consistency and recovery in a distributed system, and the issues of real-time processing are reported. A thesis that provides theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based system is included. The following items are addressed: (1) atomic actions and fault-tolerance issues; (2) operating system structure; (3) program development; (4) a reliable compiler for path Pascal; and (5) mediators, a mechanism for scheduling distributed system processes.

  7. Network operating system focus technology

    Science.gov (United States)

    1985-01-01

    An activity structured to provide specific design requirements and specifications for the Space Station Data Management System (DMS) Network Operating System (NOS) is outlined. Examples are given of the types of supporting studies and implementation tasks presently underway to realize a DMS test bed capability to develop hands-on understanding of NOS requirements as driven by actual subsystem test beds participating in the overall Johnson Space Center test bed program. Classical operating system elements and principal NOS functions are listed.

  8. Nuclear Experts Discuss IAEA Operational Safety Reviews

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: Senior nuclear experts today offered several recommendations on how the International Atomic Energy Agency (IAEA) can further develop its operational safety review services. The IAEA hosted a technical meeting on the Evaluation of Effectiveness of Operational Safety Review Services and their Future Evolution at the Agency's headquarters in Vienna from 1 to 4 November 2011. Representatives from nuclear regulatory bodies, nuclear utilities, nuclear power plants and technical support organisations from 19 IAEA Member States and the World Association of Nuclear Operators (WANO) took part in the meeting. It provided a platform for the exchange of information, experience and lessons learned from the operational safety review missions performed during 2008-2011. The meeting also included discussion of expectations for the future evolution of these services. ''This week's meeting demonstrated the response of the IAEA's Member States to the lessons learned from the Fukushima accident. Nations must constantly strive to improve their nuclear safety practices, and the IAEA review services provide an excellent tool to assess their progress,'' said Miroslav Lipar, head of the IAEA's Operational Safety Section. The IAEA's operational safety review services assess the operational safety performance of nuclear power plants by conducting peer reviews using the requirements of IAEA Safety Standards. The longest running safety review service, the Operational Safety Review Team (OSART) programme, was established in 1982 and has provided advice and assistance to Member States in 165 missions to enhance the safety of nuclear power plants during commissioning and operation. Other review services available in the area of operations evaluate operating experience feedback, safe long-term operation and safety culture. The IAEA Action Plan on Nuclear Safety includes actions focused towards strengthening the existing IAEA peer reviews by incorporating lessons learned and improving

  9. Plant operator performance evaluation system

    International Nuclear Information System (INIS)

    Ujita, Hiroshi; Fukuda, Mitsuko; Kubota, Ryuji.

    1989-01-01

    A plant operator performance evaluation system to analyze plant operation records during accident training and to identify and classify operator errors has been developed for the purpose of supporting realization of a training and education system for plant operators. A knowledge engineering technique was applied to evaluation of operator behavior by both even-based and symptom-based procedures, in various situations including event transition due to multiple failures or operational errors. The system classifies the identified errors as to their single and double types based on Swain's error classification and the error levels reflecting Rasmussen's cognitive level, and it also evaluates the effect of errors on plant state and then classifies error influence, using 'knowledge for phenomena and operations', as represented by frames. It has additional functions for analysis of error statistics and knowledge acquisition support of 'knowledge for operations'. The system was applied to a training analysis for a scram event in a BWR plant, and its error analysis function was confirmed to be effective by operational experts. (author)

  10. Operation safety of complex industrial systems

    International Nuclear Information System (INIS)

    Zwingelstein, G.

    1999-01-01

    Zero fault or zero risk is an unreachable goal in industrial activities like nuclear activities. However, methods and techniques exist to reduce the risks to the lowest possible and acceptable level. The operation safety consists in the recognition, evaluation, prediction, measurement and mastery of technological and human faults. This paper analyses each of these points successively: 1 - evolution of operation safety; 2 - definitions and basic concepts: failure, missions and functions of a system and of its components, basic concepts and operation safety; 3 - forecasting analysis of operation safety: reliability data, data-banks, precautions for the use of experience feedback data; realization of an operation safety study: management of operation safety, quality assurance, critical review and audit of operation safety studies; 6 - conclusions. (J.S.)

  11. Operator Workload: Comprehensive Review and Evaluation of Operator Workload Methodologies

    Science.gov (United States)

    1989-06-01

    WORKLOAD: COMPREHENSIVE REVIEW AND EVALUATION OF OPERATOR WORKLOAD METHODOLOG I ES Page CHAPTER 1. INTRODUCTION ...and published with the approval of the Surgeoii General of the Army, from the Section of Pschology ol the Medica Department." In turn, reprinted from...505. Allport, D. A., Antonis, B., & Reynolds, P. (1972). On the divisioln of attention: A disproof of the single channel hypothesis. Quarterly Journal

  12. Engineering Review Information System

    Science.gov (United States)

    Grems, III, Edward G. (Inventor); Henze, James E. (Inventor); Bixby, Jonathan A. (Inventor); Roberts, Mark (Inventor); Mann, Thomas (Inventor)

    2015-01-01

    A disciplinal engineering review computer information system and method by defining a database of disciplinal engineering review process entities for an enterprise engineering program, opening a computer supported engineering item based upon the defined disciplinal engineering review process entities, managing a review of the opened engineering item according to the defined disciplinal engineering review process entities, and closing the opened engineering item according to the opened engineering item review.

  13. 19 CFR 146.26 - System review.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 2 2010-04-01 2010-04-01 false System review. 146.26 Section 146.26 Customs... (CONTINUED) FOREIGN TRADE ZONES Inventory Control and Recordkeeping System § 146.26 System review. The operator shall perform an annual internal review of the inventory control and recordkeeping system and...

  14. Towards a network operating system

    OpenAIRE

    López Álvarez, Victor; Gonzalez de Dios, Oscar; Fuentes, Beatriz; Yannuzzi, Marcelo; Fernández Palacios, Juan Pedro; Lopez, Diego

    2014-01-01

    A Network Operating System (NetOS) is a novel paradigm for developing a next-generation network management and operation platform. As we shall describe, NetOS not only goes far beyond the SDN concepts but also constitutes a fundamental enabler for NFV. © 2014 OSA.

  15. DMSP OLS - Operational Linescan System

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Visible and infrared imagery from DMSP Operational Linescan System (OLS) instruments are used to monitor the global distribution of clouds and cloud top temperatures...

  16. Operating systems for experimental physics

    International Nuclear Information System (INIS)

    Davies, H.E.

    1976-01-01

    Modern high energy physics experiments are very dependent on the use of computers and present a fairly well defined list of technical demands on them. It is therefore possible to look at the construction of a computer operating system and to see how the design choices should be made in order to make the systems as useful as possible to physics experiments or, more practically, to look at existing operating systems to see which can most easily be used to do the jobs of rapid data acquisition and checking. In these notes, operating systems are looked at from the point of view of the informed user. Emphasis is placed on systems which are intended for single processor microcomputers of the type frequently used for data acquisition applications. The principles described are, of course, equally valid for other kinds of system. (Auth.)

  17. Review of decision aids for nuclear-plant operators

    International Nuclear Information System (INIS)

    Kisner, R.A.

    1983-01-01

    Responses to various computer-based operational aids varied widely in detail, thus forcing distillation of the salient features of many operational aids from information sources other than the initial questionnaire. These sources included technical and management presentations, technical papers and reports, personal discussions, taped responses, sales brochures, system specifications and schematics, and other documents. The data base is dynamic, not static, owing to the nature of current trends in operational aid development. The information contained in it is subject to review and revision by the developing organizations. More systems are pending review and entry into the data base; hence the list is incomplete

  18. Optimization of power system operation

    CERN Document Server

    Zhu, Jizhong

    2015-01-01

    This book applies the latest applications of new technologies topower system operation and analysis, including new and importantareas that are not covered in the previous edition. Optimization of Power System Operation covers both traditional andmodern technologies, including power flow analysis, steady-statesecurity region analysis, security constrained economic dispatch,multi-area system economic dispatch, unit commitment, optimal powerflow, smart grid operation, optimal load shed, optimalreconfiguration of distribution network, power system uncertaintyanalysis, power system sensitivity analysis, analytic hierarchicalprocess, neural network, fuzzy theory, genetic algorithm,evolutionary programming, and particle swarm optimization, amongothers. New topics such as the wheeling model, multi-areawheeling, the total transfer capability computation in multipleareas, are also addressed. The new edition of this book continues to provide engineers andac demics with a complete picture of the optimization of techn...

  19. Review Reviewing the values of a stabdard operating procedure ...

    African Journals Online (AJOL)

    The review further discusses shortcomings related to nonexistence of standard operating procedure including inconsistent quality of service; performance variation; procedural mix-ups; and misinterpretation or miscommunication of information. In conclusion, standard operating procedure, if realized and materialized as a ...

  20. Redesigning the District Operating System

    Science.gov (United States)

    Hodas, Steven

    2015-01-01

    In this paper, we look at the inner workings of a school district through the lens of the "district operating system (DOS)," a set of interlocking mutually-reinforcing modules that includes functions like procurement, contracting, data and IT policy, the general counsel's office, human resources, and the systems for employee and family…

  1. Review of Regulations on Continued Operation for CANDU Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Man Woong; Lee, Sang Kyu; Yoo, Kun Joong; Kim, Hyun Koon; Ryu, Yong Ho [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of); Roh, Heui Young; Jin, Tae Eun [Korea Power Engineering Co., Yongin (Korea, Republic of)

    2007-10-15

    The first CANDU type reactor, Wolsong Unit 1, has been operating for twenty four years since the commencement of its commercial operation in 1983 and its lifetime will be completed until end of 2012. Hence the licensee, KHNP, is considered a continued operation for Wolsong Unit 1 in economic point of view. Regarding to the license of the continued operating of nuclear power plants including CANDU reactors, a regulatory body is developing the regulatory requirements on continued operation for reviewing the technical requirements of safety assessment and management of aging for structures, systems and components (SSC) in the nuclear power plants. Regarding to this, in this paper the review contents are described and general review results are presented.

  2. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix C: Anadromous Fish and Juvenile Fish Transportation.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings.

  3. Operations Monitoring Assistant System Design

    Science.gov (United States)

    1986-07-01

    Logic. Artificial Inteligence 25(1)::75-94. January.18. 41 -Nils J. Nilsson. Problem-Solving Methods In Artificli Intelligence. .klcG raw-Hill B3ook...operations monitoring assistant (OMA) system is designed that combines operations research, artificial intelligence, and human reasoning techniques and...KnowledgeCraft (from Carnegie Group), and 5.1 (from Teknowledze). These tools incorporate the best methods of applied artificial intelligence, and

  4. Smart Operations in Distributed Energy Resources System

    Science.gov (United States)

    Wei, Li; Jie, Shu; Zhang-XianYong; Qing, Zhou

    Smart grid capabilities are being proposed to help solve the challenges concerning system operations due to that the trade-offs between energy and environmental needs will be constantly negotiated while a reliable supply of electricity needs even greater assurance in case of that threats of disruption have risen. This paper mainly explores models for distributed energy resources system (DG, storage, and load),and also reviews the evolving nature of electricity markets to deal with this complexity and a change of emphasis on signals from these markets to affect power system control. Smart grid capabilities will also impact reliable operations, while cyber security issues must be solved as a culture change that influences all system design, implementation, and maintenance. Lastly, the paper explores significant questions for further research and the need for a simulation environment that supports such investigation and informs deployments to mitigate operational issues as they arise.

  5. Space station operating system study

    Science.gov (United States)

    Horn, Albert E.; Harwell, Morris C.

    1988-01-01

    The current phase of the Space Station Operating System study is based on the analysis, evaluation, and comparison of the operating systems implemented on the computer systems and workstations in the software development laboratory. Primary emphasis has been placed on the DEC MicroVMS operating system as implemented on the MicroVax II computer, with comparative analysis of the SUN UNIX system on the SUN 3/260 workstation computer, and to a limited extent, the IBM PC/AT microcomputer running PC-DOS. Some benchmark development and testing was also done for the Motorola MC68010 (VM03 system) before the system was taken from the laboratory. These systems were studied with the objective of determining their capability to support Space Station software development requirements, specifically for multi-tasking and real-time applications. The methodology utilized consisted of development, execution, and analysis of benchmark programs and test software, and the experimentation and analysis of specific features of the system or compilers in the study.

  6. British Columbia Power Export Corporation: Operational review for operating year, October 1989 to September 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The British Columbia Power Export Corporation (POWEREX) is a wholly owned subsidiary of British Columbia Hydro, established in 1988 as the single agency responsible for implementing the provincial policy of international electricity trade. POWEREX objectives are to conduct long term firm electricity trade utilizing private sector financing, operating capabilities, and generating sources. Short term electricity transactions are handled by the part of POWEREX called the Powerex Pool Operation. An operational review of POWEREX for 1989-90 is presented, giving information on export contracts, license approvals, export sales negotiations, pool operation revenues and sales, British Columbia Hydro generation and integrated system performance, and operational planning. 15 figs

  7. Operating System for Runtime Reconfigurable Multiprocessor Systems

    Directory of Open Access Journals (Sweden)

    Diana Göhringer

    2011-01-01

    Full Text Available Operating systems traditionally handle the task scheduling of one or more application instances on processor-like hardware architectures. RAMPSoC, a novel runtime adaptive multiprocessor System-on-Chip, exploits the dynamic reconfiguration on FPGAs to generate, start and terminate hardware and software tasks. The hardware tasks have to be transferred to the reconfigurable hardware via a configuration access port. The software tasks can be loaded into the local memory of the respective IP core either via the configuration access port or via the on-chip communication infrastructure (e.g. a Network-on-Chip. Recent-series of Xilinx FPGAs, such as Virtex-5, provide two Internal Configuration Access Ports, which cannot be accessed simultaneously. To prevent conflicts, the access to these ports as well as the hardware resource management needs to be controlled, e.g. by a special-purpose operating system running on an embedded processor. For that purpose and to handle the relations between temporally and spatially scheduled operations, the novel approach of an operating system is of high importance. This special purpose operating system, called CAP-OS (Configuration Access Port-Operating System, which will be presented in this paper, supports the clients using the configuration port with the services of priority-based access scheduling, hardware task mapping and resource management.

  8. Management systems in production operations

    International Nuclear Information System (INIS)

    Walters, K.B.; Henderson, G.

    1993-01-01

    The Cullen Enquiry into the Piper Alpha disaster in the U.K. North Sea recommended that an operator should formally present it's company Management System and demonstrate how safety is achieved throughout the life cycle of a platform, from design through operation to abandonment. Brunei Shell Petroleum has prepared a corporate level Safety Management System. As part of Safety Case work, the corporate system is being extended to include the development of specific Management Systems with particular emphasis on offshore production operations involving integrated oil and gas facilities. This paper will describe the development of Management Systems, which includes an intensive Business Process Analysis and will comment upon it's applicability and relationship to ISO 9000. The paper will further describe the applicability and benefits of Management Systems and offer guidance on required effort. The paper will conclude that development of structured Management Systems for safety critical business processes is worthwhile but prioritization of effort will be necessary. As such the full adoption of Management Systems will be directional in nature

  9. Report of a consultants' meeting to review the IAEA programme on operational safety services as part of the programme performance assessment system (PPAS) within the IAEA

    International Nuclear Information System (INIS)

    1996-09-01

    The consultants consider that the ASCOT (Assessment of Safety Culture in Organizations Team), ASSET (Assessment of Safety Significant Events Team), and OSART (Operational Safety Review Team) programmes contribute to enhancing safe performance of Member States nuclear power plants. Continued co-ordination with the World Association of Nuclear Operators and national programmes in addition to continued emphasis on developing self assessment capabilities at the power plants will contribute to continuing improvement. International performance indicators clearly portray improvements in almost all areas. For example, the incidence of unplanned scrams and the unavailability of systems important to safety reduced. All three programmes ASCOT, ASSET and OSART may be improved by: tailoring them to meet the requested need. This includes not only the use of the OSART modular concepts but also the mixing and matching of the programmes. All three programmes can be enhanced by the sharing and use of their individual current techniques. The balance between assistance for conducting self assessment and direct assessment activities must be carefully considered. Country profiles could assist the Agency staff in advising Member States on request in the technique; power plant assistance or direct assessment, that would yield the best result. It is therefore recommended that the Agency go forward with the effort to develop these profiles. Figs, tabs

  10. Remote operation system for container

    International Nuclear Information System (INIS)

    Nakahara, Hirotaka; Hayata, Takashi; Kajiyama, Shigeru; Takahashi, Fuminobu

    1998-01-01

    The present invention provides a remote operation system for conducting operation with operation reaction for the inside of a container filled with water (liquid), such as of inner walls and inner structural materials of a BWR type reactor. Namely, a swimming robot comprises a swimming device swimming in the liquid and an attaching/detaching device for holding/releasing the handling robot. A control device remotely operate the swimming robot and the handling robot by way of a cable. A cable processing device takes up or dispenses the cable. In addition, when the swimming robot grasps the handling robot by the attaching/detaching device, the swimming robot transmits an operation instruction sent from the control device by way of the cable to the handling robot. After the attaching/detaching device of the swimming robot releases the handling robot, the handling robot operates based on the transmitted operation instruction. It is preferable that the handling robot has an adsorptive moving device for moving itself while being adsorbed on the wall surface of the container. (I.S.)

  11. Advanced Transport Operating Systems Program

    Science.gov (United States)

    White, John J.

    1990-01-01

    NASA-Langley's Advanced Transport Operating Systems Program employs a heavily instrumented, B 737-100 as its Transport Systems Research Vehicle (TRSV). The TRSV has been used during the demonstration trials of the Time Reference Scanning Beam Microwave Landing System (TRSB MLS), the '4D flight-management' concept, ATC data links, and airborne windshear sensors. The credibility obtainable from successful flight test experiments is often a critical factor in the granting of substantial commitments for commercial implementation by the FAA and industry. In the case of the TRSB MLS, flight test demonstrations were decisive to its selection as the standard landing system by the ICAO.

  12. Operation of large cryogenic systems

    International Nuclear Information System (INIS)

    Rode, C.H.; Ferry, B.; Fowler, W.B.; Makara, J.; Peterson, T.; Theilacker, J.; Walker, R.

    1985-06-01

    This report is based on the past 12 years of experiments on R and D and operation of the 27 kW Fermilab Tevatron Cryogenic System. In general the comments are applicable for all helium plants larger than 1000W (400 l/hr) and non mass-produced nitrogen plants larger than 50 tons per day. 14 refs., 3 figs., 1 tab

  13. Operator reliability assessment system (OPERAS)

    International Nuclear Information System (INIS)

    Spurgin, A.J.; Hallam, J.W.; Spurgin, J.P.; Singh, A.

    1991-01-01

    The paper gives an overview of the OPERAS project. It discusses the background which led to the design of the PC-based data collection and analysis system connected to plant training simulators including those used for nuclear power plants. The usefulness of a system like OPERAS was perceived during an earlier EPRI project, the Operator Reliability Experiments project, by EPRI and PG and E. The data collection and analysis approaches used in OPERAS were developed during the ORE project. The paper not only discusses the design of OPERAS but discusses the functions performed and the current experiences with the two prototype systems. Also listed are potential uses of OPERAS by utility personnel in Operations, Training and PRA groups

  14. ADAMS executive and operating system

    Science.gov (United States)

    Pittman, W. D.

    1981-01-01

    The ADAMS Executive and Operating System, a multitasking environment under which a variety of data reduction, display and utility programs are executed, a system which provides a high level of isolation between programs allowing them to be developed and modified independently, is described. The Airborne Data Analysis/Monitor System (ADAMS) was developed to provide a real time data monitoring and analysis capability onboard Boeing commercial airplanes during flight testing. It inputs sensor data from an airplane performance data by applying transforms to the collected sensor data, and presents this data to test personnel via various display media. Current utilization and future development are addressed.

  15. EOS Operations Systems: EDOS Implemented Changes to Reduce Operations Costs

    Science.gov (United States)

    Cordier, Guy R.; Gomez-Rosa, Carlos; McLemore, Bruce D.

    2007-01-01

    The authors describe in this paper the progress achieved to-date with the reengineering of the Earth Observing System (EOS) Data and Operations System (EDOS), the experience gained in the process and the ensuing reduction of ground systems operations costs. The reengineering effort included a major methodology change, applying to an existing schedule driven system, a data-driven system approach.

  16. New Brunswick System Operator 2005 annual report

    International Nuclear Information System (INIS)

    2005-01-01

    New Brunswick's electricity generating mix includes thermal, hydro and nuclear power. Facts about New Brunswick's electricity market were presented with reference to transmission lines; number of interconnecting operators; interconnection capacity; installed generation capacity; generation capacity mix; peak demand for 2004-2005; total energy transactions over a 6 month period and value of electricity over that 6 month period. The independently governed New Brunswick System Operator (NBSO) began operations in 2004 with a mandate to introduce competitive integrated electricity supply to municipal utilities and large industrial customers in order to ensure a reliable and adequate supply of electricity to the Maritime area. The NBSO's first task to launch the transition from monopoly supply to a competitive market is in the beginning stages, but progress has been made in terms of market rules, new computerized systems, and consultations with the Market Advisory Committee who review potential changes to the market rules and tariffs. tabs., figs

  17. Averages of operators in finite Fermion systems

    International Nuclear Information System (INIS)

    Ginocchio, J.N.

    1980-01-01

    The important ingredients in the spectral analysis of Fermion systems are the average of operators. In this paper we shall derive expressions for averages of operators in truncated Fermion spaces in terms of the minimal information needed about the operator. If we take the operator to be powers of the Hamiltonian we can then study the conditions on a Hamiltonian for the eigenvalues of the Hamiltonian in the truncated space to be Gaussian distributed. The theory of scalar traces is reviewed, and the dependence on nucleon number and single-particle states is reviewed. These results are used to show that a dilute non-interacting system will have Gaussian distributed eigenvalues, i.e., its cumulants will tend to zero, for a large number of Fermions. The dominant terms in the cumulants of a dilute interacting Fermion system are derived. In this case the cumulants depend crucially on the interaction even for a large number of Fermions. Configuration averaging is briefly discussed. Finally, comments are made on averaging for a fixed number of Fermions and angular momentum

  18. Cronus: A Distributed Operating System.

    Science.gov (United States)

    1983-11-01

    ability of the system to meet specific organization objectives. -82- .. Musa =": Report No. 5086 Bolt Beranek and Newman Inc. 2.7 Substitutability of... extracted with the OriginOfUNO operator. All UNO’s generated by the same host are strictly ordered by time of creation, and can be compared using the...of data (16 words) by causing a microinterrupt. The service routine microcode tells the controller to proceed with pseudo- DNA . Then the I/O controller

  19. Operational Management System for Regulated Water Systems

    Science.gov (United States)

    van Loenen, A.; van Dijk, M.; van Verseveld, W.; Berger, H.

    2012-04-01

    Most of the Dutch large rivers, canals and lakes are controlled by the Dutch water authorities. The main reasons concern safety, navigation and fresh water supply. Historically the separate water bodies have been controlled locally. For optimizating management of these water systems an integrated approach was required. Presented is a platform which integrates data from all control objects for monitoring and control purposes. The Operational Management System for Regulated Water Systems (IWP) is an implementation of Delft-FEWS which supports operational control of water systems and actively gives advice. One of the main characteristics of IWP is that is real-time collects, transforms and presents different types of data, which all add to the operational water management. Next to that, hydrodynamic models and intelligent decision support tools are added to support the water managers during their daily control activities. An important advantage of IWP is that it uses the Delft-FEWS framework, therefore processes like central data collection, transformations, data processing and presentation are simply configured. At all control locations the same information is readily available. The operational water management itself gains from this information, but it can also contribute to cost efficiency (no unnecessary pumping), better use of available storage and advise during (water polution) calamities.

  20. Reproducibility of neuroimaging analyses across operating systems.

    Science.gov (United States)

    Glatard, Tristan; Lewis, Lindsay B; Ferreira da Silva, Rafael; Adalat, Reza; Beck, Natacha; Lepage, Claude; Rioux, Pierre; Rousseau, Marc-Etienne; Sherif, Tarek; Deelman, Ewa; Khalili-Mahani, Najmeh; Evans, Alan C

    2015-01-01

    Neuroimaging pipelines are known to generate different results depending on the computing platform where they are compiled and executed. We quantify these differences for brain tissue classification, fMRI analysis, and cortical thickness (CT) extraction, using three of the main neuroimaging packages (FSL, Freesurfer and CIVET) and different versions of GNU/Linux. We also identify some causes of these differences using library and system call interception. We find that these packages use mathematical functions based on single-precision floating-point arithmetic whose implementations in operating systems continue to evolve. While these differences have little or no impact on simple analysis pipelines such as brain extraction and cortical tissue classification, their accumulation creates important differences in longer pipelines such as subcortical tissue classification, fMRI analysis, and cortical thickness extraction. With FSL, most Dice coefficients between subcortical classifications obtained on different operating systems remain above 0.9, but values as low as 0.59 are observed. Independent component analyses (ICA) of fMRI data differ between operating systems in one third of the tested subjects, due to differences in motion correction. With Freesurfer and CIVET, in some brain regions we find an effect of build or operating system on cortical thickness. A first step to correct these reproducibility issues would be to use more precise representations of floating-point numbers in the critical sections of the pipelines. The numerical stability of pipelines should also be reviewed.

  1. Outsourcing critical financial system operations.

    Science.gov (United States)

    Cox, Nora; Pilbauer, Jan

    2018-01-01

    Payments Canada provides Canada's national payments systems and is responsible for the clearing and settlement infrastructure, processes and rules that underpin the exchange of billions of dollars each day through the Canadian economy. Strategic sourcing is a reality for this small organisation with a broad scope of national regulations and global standards to comply with. This paper outlines Payments Canada's approach to outsourcing its critical financial system operations, which centres on four key principles: strong relationship management; continuous learning, recording and reporting; evaluating the business landscape; and a commitment to evolving the organisation to greater resilience. This last point is covered in detail with an exploration of the organisation's resilience and security strategy as well as its risk appetite. As Payments Canada progresses to its future state, which includes modernising its core payment systems, underlying rules and standards, risk management for the industry as a whole will remain at the forefront of its collective mind. The expectation is that outsourcing will remain a fundamental element of its operating model in future, a strategy that will ensure the organisation can focus on its core business competencies and eliminate the need to develop and support in-house expertise in commodity areas.

  2. Microsoft Windows Operating System Essentials

    CERN Document Server

    Carpenter, Tom

    2012-01-01

    A full-color guide to key Windows 7 administration concepts and topics Windows 7 is the leading desktop software, yet it can be a difficult concept to grasp, especially for those new to the field of IT. Microsoft Windows Operating System Essentials is an ideal resource for anyone new to computer administration and looking for a career in computers. Delving into areas such as fundamental Windows 7 administration concepts and various desktop OS topics, this full-color book addresses the skills necessary for individuals looking to break into a career in IT. Each chapter begins with a list of topi

  3. SNAP operating system reference manual

    International Nuclear Information System (INIS)

    Sabuda, J.D.; Polito, J.; Walker, J.L.; Grant, F.H. III.

    1982-03-01

    The SNAP Operating System (SOS) is a FORTRAN 77 program which provides assistance to the safeguards analyst who uses the Safeguards Automated Facility Evaluation (SAFE) and the Safeguards Network Analysis Procedure (SNAP) techniques. Features offered by SOS are a data base system for storing a library of SNAP applications, computer graphics representation of SNAP models, a computer graphics editor to develop and modify SNAP models, a SAFE-to-SNAP interface, automatic generation of SNAP input data, and a computer graphic post-processor for SNAP. The SOS Reference Manual provides detailed application information concerning SOS as well as a detailed discussion of all SOS components and their associated command input formats. SOS was developed for the US Nuclear Regulatory Commission's Office of Nuclear Regulatory Research and the US Naval Surface Weapons Center by Pritsker and Associates, Inc., under contract to Sandia National Laboratories

  4. Incentivizing Flexibility in System Operations

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, Michael [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Bloom, Aaron P [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Townsend, Aaron [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ela, Erik [Electric Power Research Institute; Botterud, Audun [Argonne National Laboratory; Levin, Todd [Argonne National Laboratory

    2018-02-15

    Defining flexibility has been a challenge that a number of industry members and researchers have attempted to address in recent years. With increased variability and uncertainty of variable generation (VG), the resources on the system will have to be more flexible to adjust output, so that power output ranges, power ramp rates, and energy duration sustainability are sufficient to meet the needs of balancing supply with demand at various operational timescales. This chapter discusses whether existing market designs provide adequate incentives for resources to offer their flexibility into the market to meet the increased levels of variability and uncertainty introduced by VG in the short-term operational time frame. It presents a definition of flexibility and discusses how increased levels of VG require increased needs for flexibility on power systems. Following this introductory material, the chapter examines how existing market designs ensure that resources have the right incentives to provide increased flexibility, and then discusses a number of emerging market design elements that impact flexibility incentives.

  5. Cleaning up a GNU/Linux operating system

    OpenAIRE

    Oblak , Denis

    2018-01-01

    The aim of the thesis is to develop an application for cleaning up the Linux operating system that would be able to function on most distributions. The theoretical part discusses the cleaning of the Linux operating system that frees up disk space and allows a better functioning. The cleaning techniques and the existing tools for Linux are systematically reviewed and presented. The following part examines the cleaning of the Windows and MacOS operating systems. The thesis also compares all...

  6. Smart Cards and Card Operating Systems

    NARCIS (Netherlands)

    Hartel, Pieter H.; Bartlett, J.; de Jong, Eduard K.

    The operating system of an IC card should provide an appropriate interface to applications using IC cards. An incorrect choice of operations and data renders the card inefficient and cumbersome. The design principles of the UNIX operating system are most appropriate for IC card operating system

  7. The concept of information support system for operational personnel of operating NPPs

    International Nuclear Information System (INIS)

    Dunaev, V.G.; Golovanov, V.V.

    1993-01-01

    The paper has been prepared on the materials of the concept developed by the order of ''Rosenergoatom'' concern. In the present paper the main definitions, the principal objectives and functions of the operator support system (OSS) are stated, a brief analysis of operation features of some existing operator information systems is presented, the main trends of development of operator information support system are given, the way and the sequence for implementation of the systems for operating NPPs are reviewed. In this proposed concept in the first place are considered the information support systems for the operators of the power unit main control rooms, however, the presented principles may be applied while designing information support systems for operators of other control rooms of NPP. 4 refs

  8. Cluff Lake mill operations - a historical review

    International Nuclear Information System (INIS)

    Schnell, H.A.; Doell, E.; Corpus, E.

    2000-01-01

    The Cluff Lake operation started uranium production in 1980 and has produced over 50 million pounds of uranium since that time. The plant started with high grade ore (+30% U) processing and went through a series of modifications to its present operating status: Phase 1 - High-grade ore (+30% U) processing with acid leach and iron cake precipitation followed by direct yellowcake precipitation. Lower grade ore was concentrated in a gravity circuit to +30% U; Phase 1 1/2 - Reprocessing Phase 1 gravity tailings (+1% U) in an acid leach circuit with solvent extraction purification prior to yellowcake precipitation; Reprocessing of the Phase 1 leach tails (58 g/t Au) to recover gold in a Cyanide/CIP circuit followed by additional uranium recovery, and destruction and recycle of cyanide by volatilization; and Phase 2 - Treatment of the lower grade ore (0.5 to 1% U) at an increased tonnage with an acid leach, CCD, SX circuit as it is found in the existing plant. This paper will review the various processing circuits used during the phases of the Cluff Lake Mill from first uranium production to the present operation. (author)

  9. Plant operation state monitoring system

    International Nuclear Information System (INIS)

    Sakai, Masanori; Babuchi, Katsumi; Arato, Toshiaki

    1994-01-01

    The system of the present invention accurately monitors a plant operation state of a plant, such as a nuclear power plant and a thermal power plant by using high temperature water, based on water quality informations. That is, water quality informations for the objective portion by using an electrochemical water quality sensor disposed in the objective portion to be monitored in the plant are continuously extracted for a predetermined period of time. Water quality is evaluated based on the extracted information. Obtained results for water quality evaluation and predetermined reference values of the plant operation handling are compared. Necessary part among the results of the measurement is displayed or recorded. The predetermined period of time described above is a period that the water quality information reaches at least a predetermined value or a period that the predetermined value is estimated by the water quality information, and it is defined as a period capable of measuring the information for three months continuously. The measurement is preferably conducted continuously in a period up to each periodical inspection on about every one year. (I.S.)

  10. Inspection-Class Remotely Operated Vehicles—A Review

    Directory of Open Access Journals (Sweden)

    Romano Capocci

    2017-03-01

    Full Text Available This paper presents a review of inspection-class Remotely Operated Vehicles (ROVs. The review divides the classification of inspection-class ROVs; categorising the vehicles in order of size and capability. A state of the art technology review is undertaken, discussing various common subsystems of the ROV. Standard and novel ROV shapes and designs are reviewed, with emphasis on buoyancy, frame materials and hydrodynamics. Several power considerations and designs are discussed, accounting for battery fed and mains fed systems. ROV telemetry is split into a discussion on the various transmission hardware systems and the communication protocols that are most widely used in industry and research today. A range of thruster technologies is then introduced with consideration taken of the various thruster architectures available. Finally, the navigation and positioning sensors employed for ROV navigation and control are reviewed. The author has also created a number of comparison tables throughout the review; tables include comparison of wired data transmission technology, comparison of common ROV communication protocols and comparisons of various inertial navigation systems. By the end of the review the reader will have clearer understanding on the fundamentals of inspection-class ROV technologies and can use this as an introduction to further paper investigation.

  11. Prognostic Analysis System and Methods of Operation

    Science.gov (United States)

    MacKey, Ryan M. E. (Inventor); Sneddon, Robert (Inventor)

    2014-01-01

    A prognostic analysis system and methods of operating the system are provided. In particular, a prognostic analysis system for the analysis of physical system health applicable to mechanical, electrical, chemical and optical systems and methods of operating the system are described herein.

  12. Operating-system support for distributed multimedia

    NARCIS (Netherlands)

    Mullender, Sape J.; Leslie, Ian M.; McAuley, Derek

    1994-01-01

    Multimedia applications place new demands upon processors, networks and operating systems. While some network designers, through ATM for example, have considered revolutionary approaches to supporting multimedia, the same cannot be said for operating systems designers. Most work is evolutionary in

  13. Osprey: Operating system for predictable clouds

    NARCIS (Netherlands)

    Sacha, Jan; Napper, Jeff; Mullender, Sape J.; McKie, Jim

    2012-01-01

    Cloud computing is currently based on hardware virtualization wherein a host operating system provides a virtual machine interface nearly identical to that of physical hardware to guest operating systems. Full transparency allows backward compatibility with legacy software but introduces

  14. Operating-System Support for Distributed Multimedia

    NARCIS (Netherlands)

    Mullender, Sape J.; Leslie, Ian M.; McAuley, Derek

    1994-01-01

    Multimedia applications place new demands upon processors, networks and operating systems. While some network designers, through ATM for example, have considered revolutionary approaches to supporting multimedia, the same cannot be said for operating systems designers. Most work is evolutionary in

  15. The Fast Amsterdam Multiprocessor (FAMP) operating system

    CERN Document Server

    Gosman, D; Holthuizen, D J; Por, G J A; Schoorel, M

    1981-01-01

    The Fast Amsterdam Multiprocessor system (FAMP system) is developed for online filtering and second stage triggering. The system is based on the MC68000 microprocessor from MOTOA. The authors describe the FAMP operating system software, the features of the slaves and supervisor in the FAMP operating system, the communication between supervisor and slaves using the dual port memories, the communication between user programs and the operating system. (7 refs).

  16. Intelligent operation system for nuclear power plants

    International Nuclear Information System (INIS)

    Morioka, Toshihiko; Fukumoto, Akira; Suto, Osamu; Naito, Norio.

    1987-01-01

    Nuclear power plants consist of many systems and are operated by skillful operators with plenty of knowledge and experience of nuclear plants. Recently, plant automation or computerized operator support systems have come to be utilized, but the synthetic judgment of plant operation and management remains as human roles. Toshiba is of the opinion that the activities (planning, operation and maintenance) should be integrated, and man-machine interface should be human-friendly. We have begun to develop the intelligent operation system aiming at reducing the operator's role within the fundamental judgment through the use of artificial intelligence. (author)

  17. Denmark: Health system review

    DEFF Research Database (Denmark)

    Juul, Annegrete; Krasnik, Allan; Rudkjøbing, Andreas

    The Health Systems in Transition (HiT) series provide detailed descriptions of health systems in the countries of the WHO European Region as well as some additional OECD countries. An individual health system review (HiT) examines the specific approach to the organization, financing and delivery...... of health services in a particular country and the role of the main actors in the health system. It describes the institutional framework, process, content, and implementation of health and health care policies. HiTs also look at reforms in progress or under development and make an assessment of the health...... system based on stated objectives and outcomes with respect to various dimensions (health status, equity, quality, efficiency, accountability)....

  18. Radon in water aeration system operational performance

    International Nuclear Information System (INIS)

    Lamarre, B.L.

    1990-01-01

    North East Environmental Products, Inc. is a manufacturer of residential scale aeration systems for removal of radon and volatile organic chemicals from private water supplies. This paper is a review of the operational history of residential scale point of entry (POE) radon aeration systems. Emphasis is placed on the difficulties and solutions encountered in actual installations caused by both mechanical difficulties and water quality parameters. A summary of radon reduction efficiency is presented for wells with radon concentrations from 21,000 to 2,600,000 pCi/L. A discussion of customer concerns and attitudes is presented along with other areas for further technical improvement. Training techniques for dealers and installers are also discussed. An update of the current status of the radon in water industry includes current sales volumes as compared to the potential market and an update on the radon in water MCL standard setting process from an industry perspective

  19. Operating systems for industrial robot controls

    Energy Technology Data Exchange (ETDEWEB)

    Ruck, J.; Rettelbusch, L.

    1982-01-01

    The authors explain the basic principles for the construction of the core of an operating system, the core being dependent upon the hardware but independent of the problem software. The operating system is designed upon four planes: the central hardware, the surrounding operating system core, the system program, and the user program. The tasks of the operating system core (responsibility for fast reaction to external events, process coordination and synchronization, amounting to simulation of a virtual machine for each process), are discussed in detail. The system permits the management of parallel-running or simultaneous processes so that every programmer working on the whole system can utilize his own virtual machine. 3 references.

  20. Optimum operation cycle of nuclear plant in power system operation

    International Nuclear Information System (INIS)

    Kurihara, Ikuo; Matsumura, Tetsuo; Katayama, Noboru

    1989-01-01

    Extension of nuclear power plant operation cycle leads to improvement of its capacity factor and affects to suppress thermal plant generation of which fuel cost is relatively high. On the other hand, the number of nuclear fuel assembly to be exchanged at the time of maintenance increases with the operation cycle extension and this makes the fuel cost of nuclear generation high. For this reason, there exists the optimum operation cycle from the power system operation. This report deals with the optimum operation cycle of nuclear plant as the optimum sharing problem of generated energy between nuclear and thermal plants. The incremental fuel cost is considered to find the optimum value. The effects of the generation mix and high burn-up fuel on optimum operation cycle are examined. (author)

  1. '95 computer system operation project

    International Nuclear Information System (INIS)

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new

  2. `95 computer system operation project

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new.

  3. Autonomous Operations System: Development and Application

    Science.gov (United States)

    Toro Medina, Jaime A.; Wilkins, Kim N.; Walker, Mark; Stahl, Gerald M.

    2016-01-01

    Autonomous control systems provides the ability of self-governance beyond the conventional control system. As the complexity of mechanical and electrical systems increases, there develops a natural drive for developing robust control systems to manage complicated operations. By closing the bridge between conventional automated systems to knowledge based self-awareness systems, nominal control of operations can evolve into relying on safe critical mitigation processes to support any off-nominal behavior. Current research and development efforts lead by the Autonomous Propellant Loading (APL) group at NASA Kennedy Space Center aims to improve cryogenic propellant transfer operations by developing an automated control and health monitoring system. As an integrated systems, the center aims to produce an Autonomous Operations System (AOS) capable of integrating health management operations with automated control to produce a fully autonomous system.

  4. NASA Space Launch System Operations Strategy

    Science.gov (United States)

    Singer, Joan A.; Cook, Jerry R.; Singer, Christer E.

    2012-01-01

    The National Aeronautics and Space Administration s (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is charged with delivering a new capability for human and scientific exploration beyond Earth orbit (BEO). The SLS may also provide backup crew and cargo services to the International Space Station, where astronauts have been training for long-duration voyages to destinations such as asteroids and Mars. For context, the SLS will be larger than the Saturn V, providing 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130-t configuration. The SLS Program knows that affordability is the key to sustainability. This paper will provide an overview of its operations strategy, which includes initiatives to reduce both development and fixed costs by using existing hardware and infrastructure assets to meet a first launch by 2017 within the projected budget. It also has a long-range plan to keep the budget flat using competitively selected advanced technologies that offer appropriate return on investment. To arrive at the launch vehicle concept, the SLS Program conducted internal engineering and business studies that have been externally validated by industry and reviewed by independent assessment panels. A series of design reference missions has informed the SLS operations concept, including launching the Orion Multi-Purpose Crew Vehicle (MPCV) on an autonomous demonstration mission in a lunar flyby scenario in 2017, and the first flight of a crew on Orion for a lunar flyby in 2021. Additional concepts address the processing of very large payloads, using a series of modular fairings and adapters to flexibly configure the rocket for the mission. This paper will describe how the SLS, Orion, and Ground Systems Development and Operations (GSDO) programs are working together to create streamlined, affordable operations for sustainable exploration for decades to come.

  5. Latvia: Health system review.

    Science.gov (United States)

    Mitenbergs, Uldis; Taube, Maris; Misins, Janis; Mikitis, Eriks; Martinsons, Atis; Rurane, Aiga; Quentin, Wilm

    2012-01-01

    This analysis of the Latvian health system reviews recent developments in organization and governance, health financing, health care provision, health reforms and health-system performance. Latvia has been constantly reforming its health system for over two decades. After independence in 1991, Latvia initially moved to create a social health insurance type system. However, problems with decentralized planning and fragmented and inefficient financing led to this being gradually reversed, and ultimately the establishment in 2011 of a National Health Service type system. These constant changes have taken place against a backdrop of relatively poor health and limited funding, with a heavy burden for individuals; Latvia has one of the highest rates of out-of-pocket expenditure on health in the European Union (EU). The lack of financial resources resulting from the financial crisis has posed an enormous challenge to the government, which struggled to ensure the availability of necessary health care services for the population and to prevent deterioration of health status. Yet this also provided momentum for reforms: previous efforts to centralise the system and to shift from hospital to outpatient care were drastically accelerated, while at the same time a social safety net strategy was implemented (with financial support from the World Bank) to protect the poor from the negative consequences of user charges. However, as in any health system, a number of challenges remain. They include: reducing smoking and cardiovascular deaths; increasing coverage of prescription pharmaceuticals; reducing the excessive reliance on out-of-pocket payments for financing the health system; reducing inequities in access and health status; improving efficiency of hospitals through implementation of DRG-based financing; and monitoring and improving quality. In the face of these challenges at a time of financial crisis, one further challenge emerges: ensuring adequate funding for the health

  6. Automated validation of a computer operating system

    Science.gov (United States)

    Dervage, M. M.; Milberg, B. A.

    1970-01-01

    Programs apply selected input/output loads to complex computer operating system and measure performance of that system under such loads. Technique lends itself to checkout of computer software designed to monitor automated complex industrial systems.

  7. Malta: Health system review.

    Science.gov (United States)

    Azzopardi Muscat, Natasha; Calleja, Neville; Calleja, Antoinette; Cylus, Jonathan

    2014-01-01

    This analysis of the Maltese health system reviews the developments in its organization and governance, health financing, health-care provision, health reforms and health system performance. The health system in Malta consists of a public sector, which is free at the point of service and provides a comprehensive basket of health services for all its citizens, and a private sector, which accounts for a third of total health expenditure and provides the majority of primary care. Maltese citizens enjoy one of the highest life expectancies in Europe. Nevertheless, non-communicable diseases pose a major concern with obesity being increasingly prevalent among both adults and children. The health system faces important challenges including a steadily ageing population, which impacts the sustainability of public finances. Other supply constraints stem from financial and infrastructural limitations. Nonetheless, there exists a strong political commitment to ensure the provision of a healthcare system that is accessible, of high quality, safe and also sustainable. This calls for strategic investments to underpin a revision of existing processes whilst shifting the focus of care away from hospital into the community. World Health Organization 2014 (acting as the host organization for, and secretariat of, the European Observatory on Health Systems and Policies).

  8. The fast Amsterdam multiprocessor (FAMP) operation system

    International Nuclear Information System (INIS)

    Gosman, D.; Hertzberger, L.O.; Holthuizen, D.J.; Por, G.J.A.; Schoorel, M.

    1981-01-01

    The Fast Amsterdam Multi Processor system (FAMP system) is developed for on-line filtering and second stage triggering. The system is based on the MC 68000 microprocessor from MOTOROLA. In this report we will describe: The FAMP operating system software, the features of the slaves and supervisor in the FAMP operating system, the communication between supervisor and slaves using the dual port memories, the communication between user programs and the operating system. The hardware as well as the application of the system will be described elsewhere. (orig.)

  9. Lithuania: health system review.

    Science.gov (United States)

    Murauskiene, Liubove; Janoniene, Raimonda; Veniute, Marija; van Ginneken, Ewout; Karanikolos, Marina

    2013-01-01

    This analysis of the Lithuanian health system reviews the developments in organization and governance, health financing, health-care provision, health reforms and health system performance since 2000.The Lithuanian health system is a mixed system, predominantly funded from the National Health Insurance Fund through a compulsory health insurance scheme, supplemented by substantial state contributions on behalf of the economically inactive population amounting to about half of its budget. Public financing of the health sector has gradually increased since 2004 to 5.2 per cent of GDP in 2010.Although the Lithuanian health system was tested by the recent economic crisis, Lithuanias counter-cyclical state health insurance contribution policies (ensuring coverage for the economically inactive population) helped the health system to weather the crisis, and Lithuania successfully used the crisis as a lever to reduce the prices of medicines.Yet the future impact of cuts in public health spending is a cause for concern. In addition, out-of-pocket payments remain high (in particular for pharmaceuticals) and could threaten health access for vulnerable groups.A number of challenges remain. The primary care system needs strengthening so that more patients are treated instead of being referred to a specialist, which will also require a change in attitude by patients. Transparency and accountability need to be increased in resource allocation, including financing of capital investment and in the payer provider relationship. Finally, population health,albeit improving, remains a concern, and major progress can be achieved by reducing the burden of amenable and preventable mortality. World Health Organization 2013 (acting as the host organization for, and secretariat of, the European Observatory on Health Systems and Policies).

  10. Slovenia: Health System Review.

    Science.gov (United States)

    Albreht, Tit; Pribakovic Brinovec, Radivoje; Josar, Dusan; Poldrugovac, Mircha; Kostnapfel, Tatja; Zaletel, Metka; Panteli, Dimitra; Maresso, Anna

    2016-06-01

    This analysis of the Slovene health system reviews recent developments in organization and governance, health financing, health care provision, health reforms and health system performance. The health of the population has improved over the last few decades. While life expectancy for both men and women is similar to EU averages, morbidity and mortality data show persistent disparities between regions, and mortality from external causes is particularly high. Satisfaction with health care delivery is high, but recently waiting times for some outpatient specialist services have increased. Greater focus on preventive measures is also needed as well as better care coordination, particularly for those with chronic conditions. Despite having relatively high levels of co-payments for many services covered by the universal compulsory health insurance system, these expenses are counterbalanced by voluntary health insurance, which covers 95% of the population liable for co-payments. However, Slovenia is somewhat unique among social health insurance countries in that it relies almost exclusively on payroll contributions to fund its compulsory health insurance system. This makes health sector revenues very susceptible to economic and labour market fluctuations. A future challenge will be to diversify the resource base for health system funding and thus bolster sustainability in the longer term, while preserving service delivery and quality of care. Given changing demographics and morbidity patterns, further challenges include restructuring the funding and provision of long-term care and enhancing health system efficiency through reform of purchasing and provider-payment systems. World Health Organization 2016 (acting as the host organization for, and secretariat of, the European Observatory on Health Systems and Policies).

  11. Linear systems and operators in Hilbert space

    CERN Document Server

    Fuhrmann, Paul A

    2014-01-01

    A treatment of system theory within the context of finite dimensional spaces, this text is appropriate for students with no previous experience of operator theory. The three-part approach, with notes and references for each section, covers linear algebra and finite dimensional systems, operators in Hilbert space, and linear systems in Hilbert space. 1981 edition.

  12. Operational Readiness Review: Savannah River Replacement Tritium Facility

    International Nuclear Information System (INIS)

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members

  13. Review of GaN-based devices for terahertz operation

    Science.gov (United States)

    Ahi, Kiarash

    2017-09-01

    GaN provides the highest electron saturation velocity, breakdown voltage, operation temperature, and thus the highest combined frequency-power performance among commonly used semiconductors. The industrial need for compact, economical, high-resolution, and high-power terahertz (THz) imaging and spectroscopy systems are promoting the utilization of GaN for implementing the next generation of THz systems. As it is reviewed, the mentioned characteristics of GaN together with its capabilities of providing high two-dimensional election densities and large longitudinal optical phonon of ˜90 meV make it one of the most promising semiconductor materials for the future of the THz emitters, detectors, mixers, and frequency multiplicators. GaN-based devices have shown capabilities of operation in the upper THz frequency band of 5 to 12 THz with relatively high photon densities in room temperature. As a result, THz imaging and spectroscopy systems with high resolution and deep depth of penetration can be realized through utilizing GaN-based devices. A comprehensive review of the history and the state of the art of GaN-based electronic devices, including plasma heterostructure field-effect transistors, negative differential resistances, hetero-dimensional Schottky diodes, impact avalanche transit times, quantum-cascade lasers, high electron mobility transistors, Gunn diodes, and tera field-effect transistors together with their impact on the future of THz imaging and spectroscopy systems is provided.

  14. Development of an Implementation Plan Related to Biological Opinion on Operation of the Federal Columbia River Power System ; Step 1: Review and Critique of Implementation Plans.

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, Duane A.; Bunn, Amoret

    2000-12-01

    The Draft Biological Opinion on Operation of the Federal Columbia River Power System calls for the development of 1- and 5-year implementation plans. These plans will provide the roadmap for planning and subsequent implementation of actions intended to meet specific performance standards (i.e., biological objectives) in a timely manner. To develop implementation plans the key tasks and sequences of steps must be determined. Those responsible for specific tasks must be identified and they must understand what they need to do. There must be assurances that the resources (human, physical, and fiscal) to complete the tasks are available. Motivation and incentive systems should be set up. Systems to coordinate efforts and guide activity must be devised and installed. An information management system must be designed to manage and analyze data and ensure that appropriate data are collected. This will aid managers in assessing whether individual activities or actions are tracking with stated goals and objectives. Training programs to improve managerial and worker capability in making and implementing plans should be designed. Managerial leadership to guide the efforts of all individuals in achieving the goals of the anadromous and resident fish recovery must be developed. It is the entire process of managing fish recovery in relationship to the Biological Opinion that will guide, coordinate, motivate, and control work and determine the effectiveness and efficiency of plan implementation.

  15. NASA Space Launch System Operations Strategy

    Science.gov (United States)

    Singer, Joan A.; Cook, Jerry R.

    2012-01-01

    The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is charged with delivering a new capability for human and scientific exploration beyond Earth orbit. The SLS also will provide backup crew and cargo services to the International Space Station, where astronauts have been training for long-duration voyages to destinations such as asteroids and Mars. For context, the SLS will be larger than the Saturn V, providing 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130 t configuration. The SLS Program knows that affordability is the key to sustainability. This paper will provide an overview of its operations strategy, which includes initiatives to reduce both development and fixed costs by using existing hardware and infrastructure assets to meet a first launch by 2017 within the projected budget. It also has a long-range plan to keep the budget flat using competitively selected advanced technologies that offer appropriate return on investment. To arrive at the launch vehicle concept, the SLS Program conducted internal engineering and business studies that have been externally validated by industry and reviewed by independent assessment panels. A series of design reference missions has informed the SLS operations concept, including launching the Orion Multi-Purpose Crew Vehicle on an autonomous demonstration mission in a lunar flyby scenario in 2017, and the first flight of a crew on Orion for a lunar flyby in 2021. Additional concepts address the processing of very large payloads, using a series of modular fairings and adapters to flexibly configure the rocket for the mission. This paper will describe how the SLS, Orion, and 21st Century Ground Systems programs are working together to create streamlined, affordable operations for sustainable exploration.

  16. Operation technology of air treatment system in nuclear facilities

    CERN Document Server

    Chun, Y B; Hwong, Y H; Lee, H K; Min, D K; Park, K J; Uom, S H; Yang, S Y

    2001-01-01

    Effective operation techniques were reviewed on the air treatment system to protect the personnel in nuclear facilities from the contamination of radio-active particles and to keep the environment clear. Nuclear air treatment system consisted of the ventilation and filtering system was characterized by some test. Measurement of air velocity of blowing/exhaust fan in the ventilation system, leak tests of HEPA filters in the filtering, and measurement of pressure difference between the areas defined by radiation level were conducted. The results acquired form the measurements were reflected directly for the operation of air treatment. In the abnormal state of virus parts of devices composted of the system, the repairing method, maintenance and performance test were also employed in operating effectively the air treatment system. These measuring results and techniques can be available to the operation of air treatment system of PIEF as well as the other nuclear facilities in KAERI.

  17. Independent technical review of the Hanford Tank Farm Operations

    International Nuclear Information System (INIS)

    1992-07-01

    The Independent Technical Assessment of the Hanford Tank Farm Operations was commissioned by the Assistant Secretary for Environmental Restoration and Waste Management on November 1, 1991. The Independent Technical Assessment team conducted on-site interviews and inspections during the following periods: November 18 to 22,1991; April 13 to 17; and April 27 to May 1, 1992. Westinghouse Hanford Company is the management and operating contractor for the Department of Energy at the Hanford site. The Hanford Tank Farm Operations consists of 177 underground storage tanks containing 61 million gallons of high-level radioactive mixed wastes from the chemical reprocessing of nuclear fuel. The Tank Farm Operations also includes associated transfer lines, ancillary equipment, and instrumentation. The Independent Technical Assessment of the Hanford Tank Farm Operations builds upon the prior assessments of the Hanford Waste Vitrification System and the Hanford Site Tank Waste Disposal Strategy.The objective of this technical assessment was to determine whether an integrated and sound program exists to manage the tank-waste storage and tankfarm operations consistent with the Assistant Secretary for Environmental Restoration and Waste Management's guidance of overall risk minimization. The scope of this review includes the organization, management, operation, planning, facilities, and mitigation of the safety-concerns of the Hanford Tank Waste Remediation System. The assessments presented in the body of this report are based on the detailed observations discussed in the appendices. When the assessments use the term ''Hanford'' as an organizational body it means DOE-RL and Westinghouse Hanford Company as a minimum, and in many instances all of the stake holders for the Hanford site

  18. Austria: health system review.

    Science.gov (United States)

    Hofmarcher, Maria M; Quentin, Wilm

    2013-01-01

    This analysis of the Austrian health system reviews recent developments in organization and governance, health financing, health-care provision, health reforms and health-system performance. The Austrian health system provides universal coverage for a wide range of benefits and high-quality care. Free choice of providers and unrestricted access to all care levels (general practitioners, specialist physicians and hospitals) are characteristic features of the system. Unsurprisingly, population satisfaction is well above EU average. Income-related inequality in health has increased since 2005, although it is still relatively low compared to other countries. The health-care system has been shaped by both the federal structure of the state and a tradition of delegating responsibilities to self-governing stakeholders. On the one hand, this enables decentralized planning and governance, adjusted to local norms and preferences. On the other hand, it also leads to fragmentation of responsibilities and frequently results in inadequate coordination. For this reason, efforts have been made for several years to achieve more joint planning, governance and financing of the health-care system at the federal and regional level. As in any health system, a number of challenges remain. The costs of the health-care system are well above the EU15 average, both in absolute terms and as a percentage of GDP. There are important structural imbalances in healthcare provision, with an oversized hospital sector and insufficient resources available for ambulatory care and preventive medicine. This is coupled with stark regional differences in utilization, both in curative services (hospital beds and specialist physicians) and preventative services such as preventive health check-ups, outpatient rehabilitation, psychosocial and psychotherapeutic care and nursing. There are clear social inequalities in the use of medical services, such as preventive health check-ups, immunization or dentistry

  19. The University of Wisconsin OAO operating system

    Science.gov (United States)

    Heacox, H. C.; Mcnall, J. F.

    1972-01-01

    The Wisconsin OAO operating system is presented which consists of two parts: a computer program called HARUSPEX, which makes possible reasonably efficient and convenient operation of the package and ground operations equipment which provides real-time status monitoring, commanding and a quick-look at the data.

  20. Decentralization of operating reactor licensing reviews: NRR Pilot Program

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1984-07-01

    This report, which has incorporated comments received from the Commission and ACRS, describes the program for decentralization of selected operating reactor licensing technical review activities. The 2-year pilot program will be reviewed to verify that safety is enhanced as anticipated by the incorporation of prescribed management techniques and application of resources. If the program fails to operate as designed, it will be terminated

  1. Development of JRR-4 operation support system

    International Nuclear Information System (INIS)

    Takahashi, Hiroki; Yamamoto, Kazuyoshi; Yoritsune, Tsutomu; Arai, Nobuyoshi; Birumachi, Takashi

    1999-03-01

    The Japan Research Reactor No.4 (JRR-4) is a light water moderated and cooled, graphite reflected, pool-type reactor with the thermal output of 3500 kW. In February 1996, a work on core modification from high-enriched fuels to low-enriched ones was started and the work on modification was completed in May 1998. As a part of the work, Operation Support System (OSS) was adopted for the purpose of reducing load of operator, preventing operator's error and supplying operation data to users. In this paper, JRR-4 Operation Support System's configuration, characteristics and development process are described. OSS consists mainly of a workstation (WS), μXL and Personal Computer (PC). WS is used for collection of operation data. μXL is used for cooling system control and PC is used for operators' support. All of the program applications used in WS, μXL and PC are designed to make sure of high flexibility for the demands on modification from operators and new operation modes. The result of adopting this system, the consolidation monitoring, automation of part of reactor operation and data management were realized. In addition, the cooling control system was compacted. (author)

  2. Standardization of computer systems for logging operative cases.

    Science.gov (United States)

    Feldman, M D; Lowry, L D; Wisnicki, H J

    1988-10-01

    With the advent of extremely rapid, powerful, compact, and inexpensive microcomputers, a revolution in data manipulation is ongoing. We have customized and used for over two years prepackaged software to track residents' operative experiences in the Department of Otolaryngology at Jefferson Medical College of Thomas Jefferson University, Philadelphia. An attempt is presently being made to develop a similar system that might be utilized by all otolaryngology teaching programs and thus enable the collection and review of residents' operative experiences nationally. A basic, relational database system is proposed for entering resident caseload data and generating reports for periodic review.

  3. Expert-System Consultant To Operating Personnel

    Science.gov (United States)

    Heard, Astrid E.; Pinkowski, Patrick P.; Adler, Richard M.; Hosken, R. Bruce

    1992-01-01

    Artificial intelligence aids engineers and technicians in controlling and monitoring complicated systems. Operations Analyst for Distributed Systems (OPERA) software is developmental suite of expert-system computer programs helping engineers and technicians operating from number of computer workstations to control and monitor spacecraft during prelaunch and launch phases of operation. OPERA designed to serve as consultant to operating engineers and technicians. It preprocesses incoming data, using expertise collected from conglomerate of specialists in design and operation of various parts of system. Driven by menus and mouse-activated commands. Modified versions of OPERA used in chemical-processing plants, factories, banks, and other enterprises in which there are distributed-computer systems including computers that monitor or control other computers.

  4. Operational advanced materials control and accountability system

    International Nuclear Information System (INIS)

    Malanify, J.J.; Bearse, R.C.; Christensen, E.L.

    1980-01-01

    An accountancy system based on the Dynamic Materials Accountability (DYMAC) System has been in operation at the Plutonium Processing Facility at the Los Alamos Scientific Laboratory (LASL) since January 1978. This system, now designated the Plutonium Facility/Los Alamos Safeguards System (PF/LASS), has enhanced nuclear material accountability and process control at the LASL facility. The nondestructive assay instruments and the central computer system are operating accurately and reliably. As anticipated, several uses of the system have developed in addition to safeguards, notably scrap control and quality control. The successes of this experiment strongly suggest that implementation of DYMAC-based systems should be attempted at other facilities. 20 refs

  5. Operator support system for nuclear power plants

    International Nuclear Information System (INIS)

    Mori, Nobuyuki; Tai, Ichiro; Sudo, Osamu; Naito, Norio.

    1987-01-01

    The nuclear power generation in Japan maintains the high capacity factor, and its proportion taken in the total generated electric power exceeded 1/4, thus it has become the indispensable energy source. Recently moreover, the nuclear power plants which are harmonious with operators and easy to operate are demanded. For realizing this, the technical development such as the heightening of operation watching performance, the adoption of automation, and the improvement of various man-machine systems for reducing the burden of operators has been advanced by utilizing electronic techniques. In this paper, the trend of the man-machine systems in nuclear power plants, the positioning of operation support system, the support in the aspects of information, action and knowledge, the example of a new central control board, the operation support system using a computer, an operation support expert system and the problems hereafter are described. As the development of the man-machine system in nuclear power plants, the upgrading from a present new central control board system PODIA through A-PODIA, in which the operational function to deal with various phenomena arising in plants and safety control function are added, to 1-PODIA, in which knowledge engineering technology is adopted, is expected. (Kako, I.)

  6. Transfer operations with tritium: a review

    International Nuclear Information System (INIS)

    Folkers, C.L.; Gede, V.P.

    1975-01-01

    Controlled thermonuclear reactors will involve pumping operations with tritium that may involve pressures ranging from submillipascals to megapascals. A variety of pumps are available that can cover portions of this range, and these can be staged to cover the entire pressure range. Some of these pumps can be adapted to virtually any size requirement currently anticipated. Special attention must be paid to operating features and construction materials. (U.S.)

  7. Real-Time Operating Systems for Multicore Embedded Systems

    OpenAIRE

    Tomiyama, Hiroyuki; Honda, Shinya; Takada, Hiroaki

    2008-01-01

    Multicore systems-on-chip have become popular inthe design of embedded systems in order to simultaneously achieve high performance and low power consumption. On the software side, real-time operating systems are necessary in orderto handle growing complexity of embedded software. This paper describes requirements, design principles and implementation techniques for real-time operating systems to be used inasymmetric multicore systems.

  8. RHCV Telescope System Operations Manual

    Science.gov (United States)

    2018-01-05

    restrictions described on inside pages STINFO COPY AIR FORCE RESEARCH LABORATORY 711 HUMAN PERFORMANCE WING, AIRMAN SYSTEMS DIRECTORATE, WRIGHT...corporation; or convey any rights or permission to manufacture, use, or sell any patented invention that may relate to them. Qualified requestors...4302. Respondents should be aware that notwithstanding any other provision of law , no person shall be subject to any penalty for failing to comply

  9. Modernisation of the CERN operational dosimetery system

    CERN Multimedia

    Caroline Duc

    2013-01-01

     As part of continual efforts to ensure the highest standards in the field of Radiation Protection, CERN is modernising its operational dosimetry system.   Pierre Carbonez, head of the Dosimetery and Instrument Calibration Service, with one of the new automatic operational dosimetery reader terminals. No more sheets of paper to record radiation doses at the entrance to the accelerators: the operational dosimetry system is being modernised! Since March, 50 automatic operational dosimeter reader terminals are in operation around the accelerator complex. Operational dosimeters (DMC) complement the "passive" dosimeters (DIS) and must be used every time you enter Controlled Radiation Areas. They measure the dose of radiation received by the exposed worker in real time and give a warning if the acceptable threshold is exceeded. The new dosimeter reader system allows the dosage recording procedure to be automated. “Every pers...

  10. UNIX-based operating systems robustness evaluation

    Science.gov (United States)

    Chang, Yu-Ming

    1996-01-01

    Robust operating systems are required for reliable computing. Techniques for robustness evaluation of operating systems not only enhance the understanding of the reliability of computer systems, but also provide valuable feed- back to system designers. This thesis presents results from robustness evaluation experiments on five UNIX-based operating systems, which include Digital Equipment's OSF/l, Hewlett Packard's HP-UX, Sun Microsystems' Solaris and SunOS, and Silicon Graphics' IRIX. Three sets of experiments were performed. The methodology for evaluation tested (1) the exception handling mechanism, (2) system resource management, and (3) system capacity under high workload stress. An exception generator was used to evaluate the exception handling mechanism of the operating systems. Results included exit status of the exception generator and the system state. Resource management techniques used by individual operating systems were tested using programs designed to usurp system resources such as physical memory and process slots. Finally, the workload stress testing evaluated the effect of the workload on system performance by running a synthetic workload and recording the response time of local and remote user requests. Moderate to severe performance degradations were observed on the systems under stress.

  11. Microsoft Operating Systems Development and Strategy: An Assessment of the Windows 2000 Server Operating System

    National Research Council Canada - National Science Library

    Oakes, David

    1999-01-01

    .... Since then it has become the number one network operating system on the market. With the release of Windows 2000, Microsoft has followed through on its strategy of operating system consolidation and formed a new family of servers...

  12. Operator aid system for Dhruva fueling machine

    International Nuclear Information System (INIS)

    Misra, S.M.; Ramaswamy, L.R.; Gohel, N.; Bharadwaj, G.; Ranade, M.R.; Khadilkar, M.G.

    1997-01-01

    Systems with significant software contents are replacing the old hardware logic systems. These systems not only are versatile but are easy to make changes in the program. Extensive use of such systems in critical real-time operation environment warrants not only excessive training on simulators, documentation but also fault tolerant system to bring the operation to a safe state in case of error. With new graphic user software interface and advancement in personal computer hardware design, the dynamic status of the physical environment can be shown on the visual display at near real time. These visual aids along with the software covering all the interlocks aids an operator in his professional work. This paper highlights the operator aid system for Dhruva fueling machine. (author). 6 refs., 1 fig

  13. Computer operating systems: HEPiX news

    International Nuclear Information System (INIS)

    Silverman, Alan

    1995-01-01

    In October the North American and European Chapters of HEPiX (the HEP UNIX group established to share worldwide high energy physics experience in using the UNIX operating system - March 1994, page 18), held meetings at Fermilab and Saclay. The two-day Fermilab meeting attracted over 30 attendees from some 12 sites in the US, as well as representation from CERN. The three-day European meeting two weeks later was attended by some 70 people from 30 sites in Europe, the US and Japan. Both meetings featured some common themes such as the growth in the use of AFS (the Andrew File System) for distributed access to central filebases, and the continuing trend away from mainframes towards farms of UNIX workstations and/or servers. Other topics of interest included an update of the POSIX standards efforts, an online presentation of an experimental graphics interface, first impressions of new utility for batch job control in UNIX, the latest news on the spread of the HEPiX login scripts and a review of trends in magnetic tape technology. Detailed minutes are in preparation and will be published in the HEPNET.HEPiX news group in due course. In the meantime, the transparencies presented in many of the sessions at both conferences can be consulted via the World-Wide Web at URL http://wwwcn.cern.ch/hepix/ meetings.html

  14. NASA Customer Data and Operations System

    Science.gov (United States)

    Butler, Madeline J.; Stallings, William H.

    1991-01-01

    In addition to the currently provided NASA services such as Communications and Tracking and Data Relay Satellite System services, the NASA's Customer Data and Operations System (CDOS) will provide the following services to the user: Data Delivery Service, Data Archive Service, and CDOS Operations Management Service. This paper describes these services in detail and presents respective block diagrams. The CDOS services will support a variety of multipurpose missions simultaneously with centralized and common hardware and software data-driven systems.

  15. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  16. ATLAS Maintenance and Operation management system

    CERN Multimedia

    Copy, B

    2007-01-01

    The maintenance and operation of the ATLAS detector will involve thousands of contributors from 170 physics institutes. Planning and coordinating the action of ATLAS members, ensuring their expertise is properly leveraged and that no parts of the detector are understaffed or overstaffed will be a challenging task. The ATLAS Maintenance and Operation application (referred to as Operation Task Planner inside the ATLAS experiment) offers a fluent web based interface that combines the flexibility and comfort of a desktop application, intuitive data visualization and navigation techniques, with a lightweight service oriented architecture. We will review the application, its usage within the ATLAS experiment, its underlying design and implementation.

  17. Portugal: Health System Review.

    Science.gov (United States)

    de Almeida Simoes, Jorge; Augusto, Goncalo Figueiredo; Fronteira, Ines; Hernandez-Quevedo, Cristina

    2017-03-01

    This analysis of the Portuguese health system reviews recent developments in organization and governance, health financing, health care provision, health reforms and health system performance. Overall health indicators such as life expectancy at birth and at age 65 years have shown a notable improvement over the last decades. However, these improvements have not been followed at the same pace by other important dimensions of health: child poverty and its consequences, mental health and quality of life after 65. Health inequalities remain a general problem in the country. All residents in Portugal have access to health care provided by the National Health Service (NHS), financed mainly through taxation. Out-of-pocket payments have been increasing over time, not only co-payments, but particularly direct payments for private outpatient consultations, examinations and pharmaceuticals. The level of cost-sharing is highest for pharmaceutical products. Between one-fifth and one-quarter of the population has a second (or more) layer of health insurance coverage through health subsystems (for specific sectors or occupations) and voluntary health insurance (VHI). VHI coverage varies between schemes, with basic schemes covering a basic package of services, whereas more expensive schemes cover a broader set of services, including higher ceilings of health care expenses. Health care delivery is by both public and private providers. Public provision is predominant in primary care and hospital care, with a gate-keeping system in place for access to hospital care. Pharmaceutical products, diagnostic technologies and private practice by physicians constitute the bulk of private health care provision. In May 2011, the economic crisis led Portugal to sign a Memorandum of Understanding with the International Monetary Fund, the European Commission and the European Central Bank, in exchange for a loan of 78 billion euros. The agreed Economic and Financial Adjustment Programme included

  18. Software fault tolerance in computer operating systems

    Science.gov (United States)

    Iyer, Ravishankar K.; Lee, Inhwan

    1994-01-01

    This chapter provides data and analysis of the dependability and fault tolerance for three operating systems: the Tandem/GUARDIAN fault-tolerant system, the VAX/VMS distributed system, and the IBM/MVS system. Based on measurements from these systems, basic software error characteristics are investigated. Fault tolerance in operating systems resulting from the use of process pairs and recovery routines is evaluated. Two levels of models are developed to analyze error and recovery processes inside an operating system and interactions among multiple instances of an operating system running in a distributed environment. The measurements show that the use of process pairs in Tandem systems, which was originally intended for tolerating hardware faults, allows the system to tolerate about 70% of defects in system software that result in processor failures. The loose coupling between processors which results in the backup execution (the processor state and the sequence of events occurring) being different from the original execution is a major reason for the measured software fault tolerance. The IBM/MVS system fault tolerance almost doubles when recovery routines are provided, in comparison to the case in which no recovery routines are available. However, even when recovery routines are provided, there is almost a 50% chance of system failure when critical system jobs are involved.

  19. Review of control techniques for inverters parallel operation

    Energy Technology Data Exchange (ETDEWEB)

    Mohd, Alaa; Ortjohann, Egon [South Westphalia University of Applied Sciences/Division Soest, Luebecker Ring 2, 59494 Soest (Germany); Morton, Danny [The University of Bolton, Deane Road, Bolton (United Kingdom); Omari, Osama (The Arab American University, Jenin, Palestine)

    2010-12-15

    This paper presents state-of-the-art review of control methods applied currently to parallel power electronic inverters. Different system architectures, their modes of operation, management and control strategies will be analyzed; advantages and disadvantages will be discussed. Though, it is not easy to give a general view at the state of the art for the research area since it is rapid and going in different directions, this paper will focus on the main streams. This paper will start by briefly reviewing the current trends in power supply systems and the increasing importance for including power electronic devices. Next, the different techniques to parallel inverters suggested in the literature will be checked. These can be categorized to the following main approaches: master/slave control techniques, current/power sharing control techniques, and frequency/voltage droop control techniques. Finally, based on the reviewed state of the art, the study concludes by comparing the different approaches reported. In addition, their weaknesses and strengths are strained. (author)

  20. Operation of staged membrane oxidation reactor systems

    Science.gov (United States)

    Repasky, John Michael

    2012-10-16

    A method of operating a multi-stage ion transport membrane oxidation system. The method comprises providing a multi-stage ion transport membrane oxidation system with at least a first membrane oxidation stage and a second membrane oxidation stage, operating the ion transport membrane oxidation system at operating conditions including a characteristic temperature of the first membrane oxidation stage and a characteristic temperature of the second membrane oxidation stage; and controlling the production capacity and/or the product quality by changing the characteristic temperature of the first membrane oxidation stage and/or changing the characteristic temperature of the second membrane oxidation stage.

  1. Operation of the Stony Brook tandem/linac accelerator system

    International Nuclear Information System (INIS)

    Noe, J.W.

    1986-01-01

    The Stony Brook nuclear structure laboratory operates the first superconducting linac based on a lead-on-copper resonator technology. Heavy ions up to mass Aapprox. =100 from the FN tandem Van de Graaff are boosted to energies of 5--10 MeV per nucleon for a variety of nuclear structure and reaction studies. We review the first 2 1/2 years of linac operating experience, with emphasis on resonator performance, system limitations, and future improvements

  2. Operation and safety decision-making support expert system in NPP

    International Nuclear Information System (INIS)

    Wei Yanhui; Su Desong; Chen Weihua; Zhang Jianbo

    2014-01-01

    The article first reviewed three operation support systems currently used in NPP: real-time information surveillance system, important equipment surveillance system and plant process control and monitoring system, then presents the structure and function of three expert support sub-systems (intelligent alarm monitoring system, computer-based operating procedure support system, safety information expert decision support system). Finally the article discussed the meaning of a kind of operation decision making support system. (authors)

  3. Two operating modes for turbocharger system

    International Nuclear Information System (INIS)

    Bayomi, Nazih N.; Abd El-Maksoud, Rafea M.

    2012-01-01

    Highlights: ► A turbocharger system that operates in power assisted mode is introduced. ► The parameters affecting performance of the turbocharger is presented. ► Different operational charts for turbocharger are presented. ► The parametric study is helpful guide to determine turbocharger dimensioning. - Abstract: The present paper introduces a turbocharger system that operates in two different modes according to turbocharging requirements. In the first mode, the turbocharger is operating with power assistance at lower engine speeds where the power of the exhaust gases is insufficient. Thereafter, the second mode is switched leading the compressor and the turbine of the turbocharger to rotate separately for best performance. Analysis is presented to find out the parameters affecting the operation of the turbocharger and their values to achieve enhanced turbocharger performance with high efficient impellers. The parameters studied are based on data of the turbocharger operating conditions and the operational requirements of the engine. The analysis considers the turbocharger system, its turbine and its compressor. The operational charts demonstrate the simulated results for two operating modes. This study is helpful as a guide to determine the turbocharger dimensioning and blade profile assignment without using any given blade dimensional value.

  4. Nuclear Materials Identification System Operational Manual

    CERN Document Server

    Chiang, L G

    2001-01-01

    This report describes the operation and setup of the Nuclear Materials Identification System (NMIS) with a sup 2 sup 5 sup 2 Cf neutron source at the Oak Ridge Y-12 Plant. The components of the system are described with a description of the setup of the system along with an overview of the NMIS measurements for scanning, calibration, and confirmation of inventory items.

  5. Optimization Methods in Operations Research and Systems Analysis

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 2; Issue 6. Optimization Methods in Operations Research and Systems Analysis. V G Tikekar. Book Review Volume 2 Issue 6 June 1997 pp 91-92. Fulltext. Click here to view fulltext PDF. Permanent link:

  6. Windows XP Operating System Security Analysis

    National Research Council Canada - National Science Library

    Goktepe, Meftun

    2002-01-01

    .... The purpose of this research is to determine if Windows XP, when used as a workstation operating system in domain- based networks, provides adequate security policy enforcement for organizations...

  7. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  8. Operator Support System for Pressurized Water Reactor

    International Nuclear Information System (INIS)

    Wei Renjie; Shen Shifei

    1996-01-01

    Operator Support System for Pressurized Water Reactor (OSSPWR) has been developed under the sponsorship of IAEA from August 1994. The project is being carried out by the Department of Engineering Physics, Tsinghua University, Beijing, China. The Design concepts of the operator support functions have been established. The prototype systems of OSSPWR has been developed as well. The primary goal of the project is to create an advanced operator support system by applying new technologies such as artificial intelligence (AI) techniques, advanced communication technologies, etc. Recently, the advanced man-machine interface for nuclear power plant operators has been developed. It is connected to the modern computer systems and utilizes new high performance graphic displays. (author). 6 refs, 4 figs

  9. A COMPUTERIZED OPERATOR SUPPORT SYSTEM PROTOTYPE

    Energy Technology Data Exchange (ETDEWEB)

    Thomas A. Ulrich; Roger Lew; Ronald L. Boring; Ken Thomas

    2015-03-01

    A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. A prototype COSS was developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, piping and instrumentation diagram system representations, and a recommender module for mitigation actions. The initial version of the prototype is now operational at the Idaho National Laboratory using the Human System Simulation Laboratory.

  10. PCOS - An operating system for modular applications

    Science.gov (United States)

    Tharp, V. P.

    1986-01-01

    This paper is an introduction to the PCOS operating system for the MC68000 family processors. Topics covered are: development history; development support; rational for development of PCOS and salient characteristics; architecture; and a brief comparison of PCOS to UNIX.

  11. Caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  12. Advisory expert system for test rig operator

    International Nuclear Information System (INIS)

    Zielczynski, P.

    1994-01-01

    The advisory expert system MAESTRO (Modular Advisory Expert System for Test Rig Operator) has been designed to guide the operator of large experimental installation during start-up, steady state and shut down. The installation is located in the research reactor MARIA in the Institute of Atomic Energy in Swierk, Poland. The system acquires and analyses on line signals from installation and performs two tasks in real time: leading the operator and monitoring of the installation (including signal validation). Systems tasks, architecture and knowledge representation concepts are described. The system is based on expert systems techniques what makes in phases of continuous change of process parameters and it has been achieved by special knowledge representation allowing its dynamical modification. (author). 147 refs, 42 figs, 5 tab

  13. A distributed real-time operating system

    International Nuclear Information System (INIS)

    Tuynman, F.; Hertzberger, L.O.

    1984-07-01

    A distributed real-time operating system, Fados, has been developed for an embedded multi-processor system. The operating system is based on a host target approach and provides for communication between arbitrary processes on host and target machine. The facilities offered are, apart from process communication, access to the file system on the host by programs on the target machine and monitoring and debugging of programs on the target machine from the host. The process communication has been designed in such a way that the possibilities are the same as those offered by the Ada programming language. The operating system is implemented on a MC 68000 based multiprocessor system in combination with a Unix host. (orig.)

  14. Testing Infrastructure for Operating System Kernel Development

    DEFF Research Database (Denmark)

    Walter, Maxwell; Karlsson, Sven

    2014-01-01

    Testing is an important part of system development, and to test effectively we require knowledge of the internal state of the system under test. Testing an operating system kernel is a challenge as it is the operating system that typically provides access to this internal state information. Multi......-core kernels pose an even greater challenge due to concurrency and their shared kernel state. In this paper, we present a testing framework that addresses these challenges by running the operating system in a virtual machine, and using virtual machine introspection to both communicate with the kernel...... and obtain information about the system. We have also developed an in-kernel testing API that we can use to develop a suite of unit tests in the kernel. We are using our framework for for the development of our own multi-core research kernel....

  15. Modeling Control Situations in Power System Operations

    DEFF Research Database (Denmark)

    Saleem, Arshad; Lind, Morten; Singh, Sri Niwas

    2010-01-01

    Increased interconnection and loading of the power system along with deregulation has brought new challenges for electric power system operation, control and automation. Traditional power system models used in intelligent operation and control are highly dependent on the task purpose. Thus, a model...... of explicit principles for model construction. This paper presents a work on using explicit means-ends model based reasoning about complex control situations which results in maintaining consistent perspectives and selecting appropriate control action for goal driven agents. An example of power system...... for intelligent operation and control must represent system features, so that information from measurements can be related to possible system states and to control actions. These general modeling requirements are well understood, but it is, in general, difficult to translate them into a model because of the lack...

  16. Supervisory Control and Diagnostics System Distributed Operating System

    International Nuclear Information System (INIS)

    McGoldrick, P.R.

    1979-01-01

    This paper contains a description of the Supervisory Control and Diagnostics System (SCDS) Distributed Operating System. The SCDS consists of nine 32-bit minicomputers with shared memory. The system's main purpose is to control a large Mirror Fusion Test Facility

  17. The transportation operations system: A description

    International Nuclear Information System (INIS)

    Best, R.E.; Danese, F.L.; Dixon, L.D.; Peterson, R.W.; Pope, R.B.

    1990-01-01

    This paper presents a description of the system for transporting radioactive waste that may be deployed to accomplish the assigned system mission, which includes accepting spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from waste generator sites and transporting them to the FWMS destination facilities. The system description presented here contains, in part, irradiated fuel and waste casks, ancillary equipments, truck, rail, and barge transporters, cask and vehicle traffic management organizations, maintenance facilities, and other operations elements. The description is for a fully implemented system, which is not expected to be achieved, however, until several years after initial operations. 6 figs

  18. Review of relevant studies of isolated systems

    DEFF Research Database (Denmark)

    Hansen, L.H.; Lundsager, P.

    2001-01-01

    The report presents the results of a review of studies relating to integration of wind energy in isolated power supply systems, based on a systematic literature survey. The purpose of the study is to develop a methodology consisting of a set of guidelinesfor wind energy projects in isolated energy...... systems and a set of tools and models that are operational on an engineering level. The review is based on a literature search in the ETDE Energy Database with a main search covering the period 7/88 to 6/97 andsupplemented by partial update periods. A few newer references have been included in the review......, most notably the IEC/PAS 62111 specification. The amount of wind energy literature related to the subject is excessively large, and a complete review inwhich every relevant abstract is identified and examined is not feasible within the framework of this (or probably any other) study. The review results...

  19. Operating experience review for the AP1000 plant

    International Nuclear Information System (INIS)

    Chaney, T. E.; Lipner, M. H.

    2006-01-01

    Westinghouse is performing an update to the Operating Experience Review (OER) Report for the AP1000 project to account for operating experience since December 1996. Significant Operating Experience Reports, Significant Event Reports, Significant Event Notifications, Operations and Maintenance Reminders, Topical Reports, Event Analysis Reports and Licensee Event Reports were researched for pertinent input to the update. As a part of the OER, Westinghouse has also conducted operator interviews and observations during simulated plant operations and after operating events. The main purpose of the OER is to identify Human Factors Engineering (HFE) related safety issues from existing operating plant experience and to ensure that these issues are addressed in the new design. The issues and lessons learned regarding operating experience provide a basis for improving the plant design. (authors)

  20. Evaluating operating system vulnerability to memory errors.

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira, Kurt Brian; Bridges, Patrick G. (University of New Mexico); Pedretti, Kevin Thomas Tauke; Mueller, Frank (North Carolina State University); Fiala, David (North Carolina State University); Brightwell, Ronald Brian

    2012-05-01

    Reliability is of great concern to the scalability of extreme-scale systems. Of particular concern are soft errors in main memory, which are a leading cause of failures on current systems and are predicted to be the leading cause on future systems. While great effort has gone into designing algorithms and applications that can continue to make progress in the presence of these errors without restarting, the most critical software running on a node, the operating system (OS), is currently left relatively unprotected. OS resiliency is of particular importance because, though this software typically represents a small footprint of a compute node's physical memory, recent studies show more memory errors in this region of memory than the remainder of the system. In this paper, we investigate the soft error vulnerability of two operating systems used in current and future high-performance computing systems: Kitten, the lightweight kernel developed at Sandia National Laboratories, and CLE, a high-performance Linux-based operating system developed by Cray. For each of these platforms, we outline major structures and subsystems that are vulnerable to soft errors and describe methods that could be used to reconstruct damaged state. Our results show the Kitten lightweight operating system may be an easier target to harden against memory errors due to its smaller memory footprint, largely deterministic state, and simpler system structure.

  1. Method and Apparatus Providing Deception and/or Altered Operation in an Information System Operating System

    Science.gov (United States)

    Cohen, Fred; Rogers, Deanna T.; Neagoe, Vicentiu

    2008-10-14

    A method and/or system and/or apparatus providing deception and/or execution alteration in an information system. In specific embodiments, deceptions and/or protections are provided by intercepting and/or modifying operation of one or more system calls of an operating system.

  2. Croatia: health system review.

    Science.gov (United States)

    Džakula, Aleksandar; Sagan, Anna; Pavić, Nika; Lonćčarek, Karmen; Sekelj-Kauzlarić, Katarina

    2014-01-01

    of the MHI scheme are broad, patients must pay towards the costs of many goods and services, and the right to free health care services has been systematically reduced since 2003, although with exemptions for vulnerable population groups. Configuration of capital and human resources in the health care sector could be improved: for example, homes for the elderly and infirm persons operate close to maximum capacity; psychiatric care in the community is not well developed; and there are shortages of certain categories of medical professionals, including geographical imbalances. Little research is available on the policy process of health care reforms in Croatia. However, it seems that reforms often lack strategic foundations and or projections that could be analysed and scrutinized by the public, and evaluation of reform outcomes is lacking. The overall performance of the health care system seems to be good, given the amount of resources available. However, there is a lack of data to assess it properly. World Health Organization 2014 (acting as the host organization for, and secretariat of, the European Observatory on Health Systems and Policies).

  3. Expert system aided operator's mental activities training

    International Nuclear Information System (INIS)

    Gieci, A.; Macko, J.; Mosny, J.; Gese, A.

    1994-01-01

    The operator's mental activity is the most important part of his work. A processing of a large amount of the information by the operator is possible only if he/she possesses appropriate cognitive skills. To facilitate the novice's acquisition of the experienced operator's cognitive skills of the decision-making process a special type of the expert system was developed. The cognitive engineering's models and problem-solving methodology constitutes the basis of this expert system. The article gives an account of the prototype of the mentioned expert system developed to aid the whole mental activity of the nuclear power plant operator during his decision-making process. (author). 6 refs, 6 figs

  4. Operating system concepts for embedded multicores

    OpenAIRE

    Horst, Oliver; Schmidt, Adriaan

    2014-01-01

    Currently we can see an increasing adoption of multi-core platforms in the area of embedded systems. While these new hardware platforms offer the potential to satisfy the ever increasing demand for computational power, they pose considerable challenges with regard to software development. This affects the application software itself, but also the system design and architecture. Here, we address the consequences for operating system architecture in embedded systems. After dis-cussing current a...

  5. Operating health analysis of electric power systems

    Science.gov (United States)

    Fotuhi-Firuzabad, Mahmud

    The required level of operating reserve to be maintained by an electric power system can be determined using both deterministic and probabilistic techniques. Despite the obvious disadvantages of deterministic approaches there is still considerable reluctance to apply probabilistic techniques due to the difficulty of interpreting a single numerical risk index and the lack of sufficient information provided by a single index. A practical way to overcome difficulties is to embed deterministic considerations in the probabilistic indices in order to monitor the system well-being. The system well-being can be designated as healthy, marginal and at risk. The concept of system well-being is examined and extended in this thesis to cover the overall area of operating reserve assessment. Operating reserve evaluation involves the two distinctly different aspects of unit commitment and the dispatch of the committed units. Unit commitment health analysis involves the determination of which unit should be committed to satisfy the operating criteria. The concepts developed for unit commitment health, margin and risk are extended in this thesis to evaluate the response well-being of a generating system. A procedure is presented to determine the optimum dispatch of the committed units to satisfy the response criteria. The impact on the response wellbeing being of variations in the margin time, required regulating margin and load forecast uncertainty are illustrated. The effects on the response well-being of rapid start units, interruptible loads and postponable outages are also illustrated. System well-being is, in general, greatly improved by interconnection with other power systems. The well-being concepts are extended to evaluate the spinning reserve requirements in interconnected systems. The interconnected system unit commitment problem is decomposed into two subproblems in which unit scheduling is performed in each isolated system followed by interconnected system evaluation

  6. To what extent do site-based training, mentoring, and operational research improve district health system management and leadership in low- and middle-income countries: a systematic review protocol.

    Science.gov (United States)

    Belrhiti, Zakaria; Booth, Andrew; Marchal, Bruno; Verstraeten, Roosmarijn

    2016-04-27

    District health managers play a key role in the effectiveness of decentralized health systems in low- and middle-income countries. Inadequate management and leadership skills often hamper their ability to improve quality of care and effectiveness of health service delivery. Nevertheless, significant investments have been made in capacity-building programmes based on site-based training, mentoring, and operational research. This systematic review aims to review the effectiveness of site-based training, mentoring, and operational research (or action research) on the improvement of district health system management and leadership. Our secondary objectives are to assess whether variations in composition or intensity of the intervention influence its effectiveness and to identify enabling and constraining contexts and underlying mechanisms. We will search the following databases: MEDLINE, PsycInfo, Cochrane Library, CRD database (DARE), Cochrane Effective Practice and Organisation of Care (EPOC) group, ISI Web of Science, Health Evidence.org, PDQ-Evidence, ERIC, EMBASE, and TRIP. Complementary search will be performed (hand-searching journals and citation and reference tracking). Studies that meet the following PICO (Population, Intervention, Comparison, Outcome) criteria will be included: P: professionals working at district health management level; I: site-based training with or without mentoring, or operational research; C: normal institutional arrangements; and O: district health management functions. We will include cluster randomized controlled trials, controlled before-and-after studies, interrupted time series analysis, quasi-experimental designs, and cohort and longitudinal studies. Qualitative research will be included to contextualize findings and identify barriers and facilitators. Primary outcomes that will be reported are district health management and leadership functions. We will assess risk of bias with the Cochrane Collaboration's tools for randomized

  7. VLT Data Flow System Begins Operation

    Science.gov (United States)

    1999-06-01

    their proposed observations and provide accurate estimates of the amount of telescope time they will need to complete their particular scientific programme. Once the proposals have been reviewed by the OPC and telescope time is awarded by the ESO management according to the recommendation by this Committee, the successful astronomers begin to assemble detailed descriptions of their intended observations (e.g. position in the sky, time and duration of the observation, the instrument mode, etc.) in the form of computer files called Observation Blocks (OBs) . The software to make OBs is distributed by ESO and used by the astronomers at their home institutions to design their observing programs well before the observations are scheduled at the telescope. The OBs can then be directly executed by the VLT and result in an increased efficiency in the collection of raw data (images, spectra) from the science instruments on the VLT. The activation (execution) of OBs can be done by the astronomer at the telescope on a particular set of dates ( visitor mode operation) or it can be done by ESO science operations astronomers at times which are optimally suited for the particular scientific programme ( service mode operation). An enormous VLT Data Archive ESO PR Photo 25b/99 ESO PR Photo 25b/99 [Preview - JPEG: 400 x 465 pix - 160k] [Normal - JPEG: 800 x 929 pix - 568k] [High-Res - JPEG: 3000 x 3483 pix - 5.5M] Caption to ESO PR Photo 25b/99 : The first of several DVD storage robot at the VLT Data Archive at the ESO headquarters include 1100 DVDs (with a total capacity of about 16 Terabytes) that may be rapidly accessed by the archive software system, ensuring fast availbility of the requested data. The raw data generated at the telescope are stored by an archive system that sends these data regularly back to ESO headquarters in Garching (Germany) in the form of CD and DVD ROM disks. While the well-known Compact Disks (CD ROMs) store about 600 Megabytes (600,000,000 bytes) each, the

  8. 15 CFR 752.14 - System reviews.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false System reviews. 752.14 Section 752.14... LICENSE § 752.14 System reviews. (a) Post-license system reviews. BIS may conduct system reviews of the... consignees in advance of a system review. The review will involve interviews with company officials, the...

  9. Upper wind observing systems used for meteorological operations

    Directory of Open Access Journals (Sweden)

    J. Nash

    Full Text Available Methods of upper wind measurements used in operational meteorology have been reviewed to provide guidance to those developing wind profiler radar systems. The main limitations of the various methods of tracking weather balloons are identified using results from the WMO radiosonde comparisons and additional tests in the United Kingdom. Costs associated with operational balloon measurements are reviewed. The sampling and quality of operational aircraft wind observations are illustrated with examples from the ASDAR system. Measurement errors in horizontal winds are quantified wherever possible. When tracking equipment is functioning correctly, random errors in southerly and westerly wind component measurements from aircraft and weather balloons are usually in the range 0.5-2 m s-1.

  10. A diagnosis system for plant operation support

    International Nuclear Information System (INIS)

    Sundheimer, S.; Lorenzetti, J.; Lamana, C.

    1990-01-01

    The present article describes a diagnosis system for abnormal power plant events. The design is modular and uses a shell written in C languaje and a knowledge basis that can be changed easily. At present the system works with a reduced knowledge for primary and secondery leacks. The mitigation procedure is being written with the help of operation staff

  11. Effective operator formalism for open quantum systems

    DEFF Research Database (Denmark)

    Reiter, Florentin; Sørensen, Anders Søndberg

    2012-01-01

    We present an effective operator formalism for open quantum systems. Employing perturbation theory and adiabatic elimination of excited states for a weakly driven system, we derive an effective master equation which reduces the evolution to the ground-state dynamics. The effective evolution...

  12. The evolution of a distributed operating system

    NARCIS (Netherlands)

    van Renesse, Robbert; Tanenbaum, Andrew S.; Mullender, Sape J.; Schröder-Preikschat, Wolfgang; Zimmer, Wolfgang

    AMOEBA is a research project to build a true distributed operating system using the object model. Under the COST11-ter MANDIS project this work was extended to cover wide-area networks. Besides describing the system, this paper discusses the successive versions in the implementation of its model,

  13. Performance of the Amoeba Distributed Operating System

    NARCIS (Netherlands)

    van Renesse, R.; van Staveren, H.; Tanenbaum, A.S.

    1989-01-01

    Amoeba is a capability‐based distributed operating system designed for high‐performance interactions between clients and servers using the well‐known RPC model. The paper starts out by describing the architecture of the Amoeba system, which is typified by specialized components such as workstations,

  14. Operating room use of hypertonic solutions: a clinical review

    Directory of Open Access Journals (Sweden)

    Gustavo Azoubel

    2008-01-01

    Full Text Available Hyperosmotic-hyperoncotic solutions have been widely used during prehospital care of trauma patients and have shown positive hemodynamic effects. Recently, there has been a growing interest in intra-operative use of hypertonic solutions. We reviewed 30 clinical studies on the use of hypertonic saline solutions during surgeries, with the majority being cardiac surgeries. Reduced positive fluid balance, increased cardiac index, and decreased systemic vascular resistance were the main beneficial effects of using hypertonic solutions in this population. Well-designed clinical trials are highly needed, particularly in aortic aneurysm repair surgeries, where hypertonic solutions have shown many beneficial effects. Examining the immunomodulatory effects of hypertonic solutions should also be a priority in future studies.

  15. The operation of the GANIL control system

    International Nuclear Information System (INIS)

    Prome, M.; David, L.; Lecorche, E.

    1984-06-01

    When the first GANIL beams were obtained the control system was operating in an elementary way; the system behaved almost like a huge multiplexer. Now a large number of programs have been written; they allow to take benefit of the full power of the computers; they help the operators for starting, tuning and monitoring the accelerator. The paper gives a general description of these programs which are executed on the central computer: it shows how the accelerator is controlled either directly or via dedicated microprocessors. Informations are also given on the alarm system

  16. UNIVERSAL INTERFACE TO MULTIPLE OPERATIONS SYSTEMS

    DEFF Research Database (Denmark)

    Sonnenwald, Diane H.

    1986-01-01

    Alternative ways to provide access to operations systems that maintain, test, and configure complex telephone networks are being explored. It is suggested that a universal interface that provides simultaneous access to multiple operations systems that execute in different hardware and software...... environments, can be provided by an architecture that is based on the separation of presentation issues from application issues and on a modular interface management system that consists of a virtual user interface, physical user interface, and interface agent. The interface functionality that is needed...

  17. Operating experience feedback report - Air systems problems

    International Nuclear Information System (INIS)

    Ornstein, H.L.

    1987-12-01

    This report highlights significant operating events involving observed or potential failures of safety-related systems in U.S. plants that resulted from degraded or malfunctioning non-safety grade air systems. Based upon the evaluation of these events, the Office for Analysis and Evaluation of Operational Data (AEOD) concludes that the issue of air systems problems is an important one which requires additional NRC and industry attention. This report also provides AEOD's recommendations for corrective actions to deal with the issue. (author)

  18. Advanced smartgrids for distribution system operators

    CERN Document Server

    Boillot, Marc

    2014-01-01

    The dynamic of the Energy Transition is engaged in many region of the World. This is a real challenge for electric systems and a paradigm shift for existing distribution networks. With the help of "advanced" smart technologies, the Distribution System Operators will have a central role to integrate massively renewable generation, electric vehicle and demand response programs. Many projects are on-going to develop and assess advanced smart grids solutions, with already some lessons learnt. In the end, the Smart Grid is a mean for Distribution System Operators to ensure the quality and the secu

  19. The Launch Systems Operations Cost Model

    Science.gov (United States)

    Prince, Frank A.; Hamaker, Joseph W. (Technical Monitor)

    2001-01-01

    One of NASA's primary missions is to reduce the cost of access to space while simultaneously increasing safety. A key component, and one of the least understood, is the recurring operations and support cost for reusable launch systems. In order to predict these costs, NASA, under the leadership of the Independent Program Assessment Office (IPAO), has commissioned the development of a Launch Systems Operations Cost Model (LSOCM). LSOCM is a tool to predict the operations & support (O&S) cost of new and modified reusable (and partially reusable) launch systems. The requirements are to predict the non-recurring cost for the ground infrastructure and the recurring cost of maintaining that infrastructure, performing vehicle logistics, and performing the O&S actions to return the vehicle to flight. In addition, the model must estimate the time required to cycle the vehicle through all of the ground processing activities. The current version of LSOCM is an amalgamation of existing tools, leveraging our understanding of shuttle operations cost with a means of predicting how the maintenance burden will change as the vehicle becomes more aircraft like. The use of the Conceptual Operations Manpower Estimating Tool/Operations Cost Model (COMET/OCM) provides a solid point of departure based on shuttle and expendable launch vehicle (ELV) experience. The incorporation of the Reliability and Maintainability Analysis Tool (RMAT) as expressed by a set of response surface model equations gives a method for estimating how changing launch system characteristics affects cost and cycle time as compared to today's shuttle system. Plans are being made to improve the model. The development team will be spending the next few months devising a structured methodology that will enable verified and validated algorithms to give accurate cost estimates. To assist in this endeavor the LSOCM team is part of an Agency wide effort to combine resources with other cost and operations professionals to

  20. Operation of International Monitoring System Network

    Science.gov (United States)

    Nikolova, Svetlana; Araujo, Fernando; Aktas, Kadircan; Malakhova, Marina; Otsuka, Riyo; Han, Dongmei; Assef, Thierry; Nava, Elisabetta; Mickevicius, Sigitas; Agrebi, Abdelouaheb

    2015-04-01

    The IMS is a globally distributed network of monitoring facilities using sensors from four technologies: seismic, hydroacoustic, infrasound and radionuclide. It is designed to detect the seismic and acoustic waves produced by nuclear test explosions and the subsequently released radioactive isotopes. Monitoring stations transmit their data to the IDC in Vienna, Austria, over a global private network known as the GCI. Since 2013, the data availability (DA) requirements for IMS stations account for quality of the data, meaning that in calculation of data availability data should be exclude if: - there is no input from sensor (SHI technology); - the signal consists of constant values (SHI technology); Even more strict are requirements for the DA of the radionuclide (particulate and noble gas) stations - received data have to be analyzed, reviewed and categorized by IDC analysts. In order to satisfy the strict data and network availability requirements of the IMS Network, the operation of the facilities and the GCI are managed by IDC Operations. Operations has following main functions: - to ensure proper operation and functioning of the stations; - to ensure proper operation and functioning of the GCI; - to ensure efficient management of the stations in IDC; - to provide network oversight and incident management. At the core of the IMS Network operations are a series of tools for: monitoring the stations' state of health and data quality, troubleshooting incidents, communicating with internal and external stakeholders, and reporting. The new requirements for data availability increased the importance of the raw data quality monitoring. This task is addressed by development of additional tools for easy and fast identifying problems in data acquisition, regular activities to check compliance of the station parameters with acquired data by scheduled calibration of the seismic network, review of the samples by certified radionuclide laboratories. The DA for the networks of

  1. 14 CFR 415.127 - Flight safety system design and operation data.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Flight safety system design and operation... Expendable Launch Vehicle From a Non-Federal Launch Site § 415.127 Flight safety system design and operation... safety review document must describe an applicant's flight safety system and its operation. Part 417...

  2. TESS Ground System Operations and Data Products

    Science.gov (United States)

    Glidden, Ana; Guerrero, Natalia; Fausnaugh, Michael; TESS Team

    2018-01-01

    We describe the ground system operations for processing data from the Transiting Exoplanet Survey Satellite (TESS), highlighting the role of the Science Operations Center (SOC). TESS is a spaced-based (nearly) all-sky mission, designed to find small planets around nearby bright stars using the transit method. We detail the flow of data from pixel measurements on the instrument to final products available at the Mikulski Archive for Space Telescopes (MAST). The ground system relies on a host of players to process the data, including the Payload Operations Center at MIT, the Science Processing Operation Center at NASA Ames, and the TESS Science Office, led by the Harvard-Smithsonian Center for Astrophysics and MIT. Together, these groups will deliver TESS Input Catalog, instrument calibration models, calibrated target pixels and full frame images, threshold crossing event reports, two-minute light curves, and the TESS Objects of Interest List.

  3. Requirements by the operator of supporting systems

    International Nuclear Information System (INIS)

    Grimm, E.; Lot, L.

    1996-01-01

    Requirements by the nuclear power station operator on computer support orient themselves to the various operating situations which can arise in the plant. Event-oriented or system-oriented methods of handling determine the type of support by the computer. Pure plant information in situations with few events, an intelligent alarm system in situations with many events and a guide by means of pre-prepared procedures are an aspect of the operator requirements of computer solutions. These are the themes dealt with in this paper. A further theme is the support of the operator by the ergonomics of the control room in the areas of working place, lighting, air conditioning and acoustics. (author) 4 figs

  4. Control and Operation of Islanded Distribution System

    DEFF Research Database (Denmark)

    Mahat, Pukar

    A yearly demand growth of less than 3%, concern about the environment, and various benefits of onsite generation have all resulted in a significant increase in penetration of dispersed and distributed generation (DG) in many distribution systems. This has also resulted in some power system...... operational challenges. But, on the other hand, it has also opened up some opportunities. One opportunity/challenge is an islanded operation of a distribution system with DG unit(s). Islanding is a situation in which a distribution system becomes electrically isolated from the remainder of the power system...... and yet continues to be energized by DG unit(s) connected to it. Currently, it is seen as a challenge and so far all DG units need to shut down when a distribution system is islanded. However, with the DG penetration expected to increase sharply, islanding is an opportunity to improve the reliability...

  5. Operational data flow between hydrological forecasting systems

    Science.gov (United States)

    Davids, Femke; de Kleermaeker, Simone; van Loenen, Arnejan; Gijsbers, Peter; Bogaard, Tom; Twigt, Daniel; Heynert, Karel

    2014-05-01

    One of the major challenges in operational forecasting is organizing and controlling the flow of data. In the Water Management Centre for the Netherlands several FEWS (Flood Early Warning Systems) have been set up for operational use. The six systems specialize in different areas, namely i) fluvial flooding, ii) water distribution during droughts, iii) real time control of canal water levels and gauges, iv) coastal flooding, v) lake management and flooding and vi) water management in the delta area. These systems obtain data partly from the same but also from different data sources. Each individual system uses (different) models and pre and post processing steps that have been optimized for the most important parameters. It is crucial to exchange data and forecasts in an efficient way between the systems, for example to use as boundaries in model runs. This paper will describe the methods and challenges that we face in organizing the data flow between these systems.

  6. Operator support system using computational intelligence techniques

    International Nuclear Information System (INIS)

    Bueno, Elaine Inacio; Pereira, Iraci Martinez

    2015-01-01

    Computational Intelligence Systems have been widely applied in Monitoring and Fault Detection Systems in several processes and in different kinds of applications. These systems use interdependent components ordered in modules. It is a typical behavior of such systems to ensure early detection and diagnosis of faults. Monitoring and Fault Detection Techniques can be divided into two categories: estimative and pattern recognition methods. The estimative methods use a mathematical model, which describes the process behavior. The pattern recognition methods use a database to describe the process. In this work, an operator support system using Computational Intelligence Techniques was developed. This system will show the information obtained by different CI techniques in order to help operators to take decision in real time and guide them in the fault diagnosis before the normal alarm limits are reached. (author)

  7. Operator support system using computational intelligence techniques

    Energy Technology Data Exchange (ETDEWEB)

    Bueno, Elaine Inacio, E-mail: ebueno@ifsp.edu.br [Instituto Federal de Educacao, Ciencia e Tecnologia de Sao Paulo (IFSP), Sao Paulo, SP (Brazil); Pereira, Iraci Martinez, E-mail: martinez@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    Computational Intelligence Systems have been widely applied in Monitoring and Fault Detection Systems in several processes and in different kinds of applications. These systems use interdependent components ordered in modules. It is a typical behavior of such systems to ensure early detection and diagnosis of faults. Monitoring and Fault Detection Techniques can be divided into two categories: estimative and pattern recognition methods. The estimative methods use a mathematical model, which describes the process behavior. The pattern recognition methods use a database to describe the process. In this work, an operator support system using Computational Intelligence Techniques was developed. This system will show the information obtained by different CI techniques in order to help operators to take decision in real time and guide them in the fault diagnosis before the normal alarm limits are reached. (author)

  8. Embedded and real-time operating systems

    CERN Document Server

    Wang, K C

    2017-01-01

    This book covers the basic concepts and principles of operating systems, showing how to apply them to the design and implementation of complete operating systems for embedded and real-time systems. It includes all the foundational and background information on ARM architecture, ARM instructions and programming, toolchain for developing programs, virtual machines for software implementation and testing, program execution image, function call conventions, run-time stack usage and link C programs with assembly code. It describes the design and implementation of a complete OS for embedded systems in incremental steps, explaining the design principles and implementation techniques. For Symmetric Multiprocessing (SMP) embedded systems, the author examines the ARM MPcore processors, which include the SCU and GIC for interrupts routing and interprocessor communication and synchronization by Software Generated Interrupts (SGIs). Throughout the book, complete working sample systems demonstrate the design principles and...

  9. Modular integrated video system (MIVS) review station

    International Nuclear Information System (INIS)

    Garcia, M.L.

    1988-01-01

    An unattended video surveillance unit, the Modular Integrated Video System (MIVS), has been developed by Sandia National Laboratories for International Safeguards use. An important support element of this system is a semi-automatic Review Station. Four component modules, including an 8 mm video tape recorder, a 4-inch video monitor, a power supply and control electronics utilizing a liquid crystal display (LCD) are mounted in a suitcase for probability. The unit communicates through the interactive, menu-driven LCD and may be operated on facility power through the world. During surveillance, the MIVS records video information at specified time intervals, while also inserting consecutive scene numbers and tamper event information. Using either of two available modes of operation, the Review Station reads the inserted information and counts the number of missed scenes and/or tamper events encountered on the tapes, and reports this to the user on the LCD. At the end of a review session, the system will summarize the results of the review, stop the recorder, and advise the user of the completion of the review. In addition, the Review Station will check for any video loss on the tape

  10. Intelligent Control and Operation of Distribution System

    DEFF Research Database (Denmark)

    Bhattarai, Bishnu Prasad

    in this direction but also benefit distribution system operators in the planning and development of the distribution network. The major contributions of this work are described in the following four stages: In the first stage, an intelligent Demand Response (DR) control architecture is developed for coordinating......, an adaptive overcurrent protection is developed for the future distribution system having high share of RESs and Active Network Management (ANM) activities. In the future grid, the protection is affected not only by bidirectional power flow due to RESs but also due to the ANM activities such as demand....... This not only enables the end consumers to get reliable and cheap electricity but also enables the utility to prevent huge investment in counterpart. Moreover, distribution system operators can implement the findings of the projects in their operational stages to avoid grid bottlenecks and in the planning...

  11. Advanced nuclear systems. Review study

    International Nuclear Information System (INIS)

    Liebert, Wolfgang; Glaser, Alexander; Pistner, Christoph; Baehr, Roland; Hahn, Lothar

    1999-04-01

    The task of this review study is to from provide an overview of the developments in the field of the various advanced nuclear systems, and to create the basis for more comprehensive studies of technology assessment. In an overview the concepts for advanced nuclear systems pursued worldwide are subdivided into eight subgroups. A coarse examination raster (set pattern) is developed to enable a detailed examination of the selected systems. In addition to a focus on enhanced safety features, further aspects are also taken into consideration, like the lowering of the proliferation risk, the enhancement of the economic competitiveness of the facilities and new usage possibilities (for instance concerning the relaxation of the waste disposal problem or the usage of alternative fuels to uranium). The question about the expected time span for realization and the discussion about the obstacles on the way to a commercially usable reactor also play a substantial role as well as disposal requirements as far as they can be presently recognized. In the central chapter of this study, the documentation of the representatively selected concepts is evaluated as well as existing technology assessment studies and expert opinions. In a few cases where this appears to be necessary, according technical literature, further policy advisory reports, expert statements as well as other relevant sources are taken into account. Contradictions, different assessments and dissents in the literature as well as a few unsettled questions are thus indicated. The potential of advanced nuclear systems with respect to economical and societal as well as environmental objectives cannot exclusively be measured by the corresponding intrinsic or in comparison remarkable technical improvements. The acceptability of novel or improved systems in nuclear technology will have to be judged by their convincing solutions for the crucial questions of safety, nuclear waste and risk of proliferation of nuclear weapons

  12. 47 CFR 32.6220 - Operator systems expense.

    Science.gov (United States)

    2010-10-01

    ... SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES Instructions for Expense Accounts § 32.6220 Operator systems expense. This account shall include expenses associated with operator systems equipment. ...

  13. Operational development of small plant growth systems

    Science.gov (United States)

    Scheld, H. W.; Magnuson, J. W.; Sauer, R. L.

    1986-01-01

    The results of a study undertaken on the first phase of an empricial effort in the development of small plant growth chambers for production of salad type vegetables on space shuttle or space station are discussed. The overall effort is visualized as providing the underpinning of practical experience in handling of plant systems in space which will provide major support for future efforts in planning, design, and construction of plant-based (phytomechanical) systems for support of human habitation in space. The assumptions underlying the effort hold that large scale phytomechanical habitability support systems for future space stations must evolve from the simple to the complex. The highly complex final systems will be developed from the accumulated experience and data gathered from repetitive tests and trials of fragments or subsystems of the whole in an operational mode. These developing system components will, meanwhile, serve a useful operational function in providing psychological support and diversion for the crews.

  14. [Controlling systems for operating room managers].

    Science.gov (United States)

    Schüpfer, G; Bauer, M; Scherzinger, B; Schleppers, A

    2005-08-01

    Management means developing, shaping and controlling of complex, productive and social systems. Therefore, operating room managers also need to develop basic skills in financial and managerial accounting as a basis for operative and strategic controlling which is an essential part of their work. A good measurement system should include financial and strategic concepts for market position, innovation performance, productivity, attractiveness, liquidity/cash flow and profitability. Since hospitals need to implement a strategy to reach their business objectives, the performance measurement system has to be individually adapted to the strategy of the hospital. In this respect the navigation system developed by Gälweiler is compared to the "balanced score card" system of Kaplan and Norton.

  15. Health-care district management information system plan: Review of operations analysis activities during calendar year 1975 and plan for continued research and analysis activities

    Science.gov (United States)

    Nielson, G. J.; Stevenson, W. G.

    1976-01-01

    Operations research activities developed to identify the information required to manage both the efficiency and effectiveness of the Veterans Administration (VA) health services as these services relate to individual patient care are reported. The clinical concerns and management functions that determine this information requirement are discussed conceptually. Investigations of existing VA data for useful management information are recorded, and a diagnostic index is provided. The age-specific characteristics of diseases and lengths of stay are explored, and recommendations for future analysis activities are articulated. The effect of the introduction of new technology to health care is also discussed.

  16. Operational experience with the CEBAF control system

    International Nuclear Information System (INIS)

    Hovater, C.; Chowdhary, M.; Karn, J.; Tiefenback, M.; Zeijts, J. van; Watson, W.

    1996-01-01

    The CEBAF accelerator at Thomas Jefferson National Accelerator Facility (Jefferson Lab) successfully began its experimental nuclear physics program in November of 1995 and has since surpassed predicted machine availability. Part of this success can be attributed to using the EPICS (Experimental Physics and Industrial Control System) control system toolkit. The CEBAF control system is one of the largest accelerator control system now operating. It controls approximately 338 SRF cavities, 2,300 magnets, 500 beam position monitors and other accelerator devices, such as gun hardware and other beam monitoring devices. All told, the system must be able to access over 125,000 database records. The system has been well received by both operators and the hardware designers. The EPICS utilities have made the task of troubleshooting systems easier. The graphical and test-based creation tools have allowed operators to custom build control screens. In addition, the ability to integrate EPICS with other software packages, such as Tcl/Tk, has allowed physicists to quickly prototype high-level application programs, and to provide GUI front ends for command line driven tools. Specific examples of the control system applications are presented in the areas of energy and orbit control, cavity tuning and accelerator tune up diagnostics

  17. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  18. Advanced Autonomous Systems for Space Operations

    Science.gov (United States)

    Gross, A. R.; Smith, B. D.; Muscettola, N.; Barrett, A.; Mjolssness, E.; Clancy, D. J.

    2002-01-01

    New missions of exploration and space operations will require unprecedented levels of autonomy to successfully accomplish their objectives. Inherently high levels of complexity, cost, and communication distances will preclude the degree of human involvement common to current and previous space flight missions. With exponentially increasing capabilities of computer hardware and software, including networks and communication systems, a new balance of work is being developed between humans and machines. This new balance holds the promise of not only meeting the greatly increased space exploration requirements, but simultaneously dramatically reducing the design, development, test, and operating costs. New information technologies, which take advantage of knowledge-based software, model-based reasoning, and high performance computer systems, will enable the development of a new generation of design and development tools, schedulers, and vehicle and system health management capabilities. Such tools will provide a degree of machine intelligence and associated autonomy that has previously been unavailable. These capabilities are critical to the future of advanced space operations, since the science and operational requirements specified by such missions, as well as the budgetary constraints will limit the current practice of monitoring and controlling missions by a standing army of ground-based controllers. System autonomy capabilities have made great strides in recent years, for both ground and space flight applications. Autonomous systems have flown on advanced spacecraft, providing new levels of spacecraft capability and mission safety. Such on-board systems operate by utilizing model-based reasoning that provides the capability to work from high-level mission goals, while deriving the detailed system commands internally, rather than having to have such commands transmitted from Earth. This enables missions of such complexity and communication` distances as are not

  19. Expert systems for plant operations training and assistance

    International Nuclear Information System (INIS)

    Pack, R.W.; Lazar, P.M.; Schmidt, R.V.; Gaddy, C.D.

    1988-01-01

    The project described in this paper explored the use of expert systems for plant operations training and assistance. Three computer technologies were reviewed: computer-aided instruction, expert systems, and expert training systems (ETS). The technology of CAI has been developed since the early 1960s, and a wide range of applications are available commercially today. Expert systems have been developed primarily as job performance aids, and the number of commercial applications is increasing. A fully developed ETS has models of the trainer and trainee, in addition to a knowledge base

  20. Operator support systems activities at EPRI

    International Nuclear Information System (INIS)

    Naser, J.A.

    1993-01-01

    The integration of operator support systems supports the nuclear power plant goals of improved availability and reliability, enhanced safety, reduced operations and maintenance costs, and improved productivity. Two major aspects which supports this integration are discussed in this paper. The first is the plant communications and computing architecture which provides the infrastructure that allows the integration to exist in a easy to implement manner. Open systems concepts are utilized to guarantee interoperability of systems and interchangeability of equipment. The second is the EPRI Plant-Window System which supplies the interface between the human and the plant systems. It implements common human-machine interfaces amongst systems and supports the implementation of diagnostic and decision aids. Work in both of these areas is being done as part of the EPRI Instrumentation and Control Upgrade Program. A number of operator support systems have been developed and are in various stages of implementation, testing and utilization. Two of these, the RWCU and the EOPTS, are described here. 5 refs, 14 figs

  1. A Computuerized Operator Support System Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States); Boring, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lew, Roger [Idaho National Lab. (INL), Idaho Falls, ID (United States); Ulrich, Tom [Idaho National Lab. (INL), Idaho Falls, ID (United States); Villim, Richard [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-08-01

    A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based

  2. A Computuerized Operator Support System Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States); Boring, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lew, Roger [Idaho National Lab. (INL), Idaho Falls, ID (United States); Ulrich, Tom [Idaho National Lab. (INL), Idaho Falls, ID (United States); Villim, Richard [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-11-01

    A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based

  3. Operational expert system applications in Canada

    CERN Document Server

    Suen, Ching Y

    1992-01-01

    This book is part of a new series on operational expert systems worldwide. Expert systems are now widely used in different parts of the world for various applications. The past four years have witnessed a steady growth in the development and deployment of expert systems in Canada. Research in this field has also gained considerable momentum during the past few years. However, the field of expert systems is still young in Canada. This book contains 13 chapters contributed by 31 experts from both universities and industries across Canada covering a wide range of applications related to electric

  4. Intelligence system for reactor operator informational support

    International Nuclear Information System (INIS)

    Prangishvili, I.V.; Pashchenko, F.F.; Saprykin, E.M.

    1989-01-01

    Problems related to creation and introduction at NPP of highly efficient and reliable systems for monitoring and control of working processes and intelligence-endowed systems of operator informational support (ISOIS) are considered. The main units included in ISOIS are considered. The main units included in ISOIS are described. The unit of current state monitoring provides information for the operator, which is necessary under concrete conditions for the process monitoring and control, so as to avoid emergencies and affers a program of actions in a dialogue mode for the operator. The identification unit is designed for the obtaining of assessed values of process parameters (neutron fields, temperatures, pressures) and basic equipment (reactivity coefficients, fuel rod weights, time of delay). The prediction unit evaluates the behaviour of process parameters and process state in various situations. 9 refs

  5. CLASSIFICATION OF THE MGR SITE OPERATIONS SYSTEM

    International Nuclear Information System (INIS)

    J.A. Ziegler

    1999-01-01

    The purpose of this analysis is to document the Quality Assurance (QA) classification of the Monitored Geologic Repository (MGR) site operations system structures, systems and components (SSCs) performed by the MGR Safety Assurance Department. This analysis also provides the basis for revision of YMP/90-55Q, Q-List (YMP 1998). The Q-List identifies those MGR SSCs subject to the requirements of DOE/RW-0333P, ''Quality Assurance Requirements and Description'' (QARD) (DOE 1998)

  6. Distributed operating system for NASA ground stations

    Science.gov (United States)

    Doyle, John F.

    1987-01-01

    NASA ground stations are characterized by ever changing support requirements, so application software is developed and modified on a continuing basis. A distributed operating system was designed to optimize the generation and maintenance of those applications. Unusual features include automatic program generation from detailed design graphs, on-line software modification in the testing phase, and the incorporation of a relational database within a real-time, distributed system.

  7. Operator properties of generalized coherent state systems

    Indian Academy of Sciences (India)

    The main properties of standard quantum mechanical coherent states and the two generalizations of Klauder and of Perelomov are reviewed. For a system of generalized coherent states in the latter sense, necessary and sufficient conditions for existence of a diagonal coherent stable representation for all Hilbert-Schmidt ...

  8. The systemic dimension of operational decision in complex systems work

    OpenAIRE

    Sampaio, José João

    2009-01-01

    This paper refers to some of my research findings on Decision Making processes in complex systems work. Starting as a complex cognitive process strongly contextualized in the operating environment, it ends up, in complex systems work, as an equally complex network of actors and systems (human and technological) that are confronted, in real time, with uncertainty , a large amount of information and feedback and with multiple standards and operating procedures...

  9. Adlerian psychology as an intuitive operant system.

    Science.gov (United States)

    Pratt, A B

    1985-01-01

    Traditional accounts of the Individual Psychology of Alfred Adler tend to sentimentalize his system and obscure its functional flavor. Six basic Adlerian positions on human behavior, including Rudolf Dreikurs' "four goals of misbehavior," are interpreted as a primitive statement of operant principles. Applied techniques long used by Individual Psychology practitioners strongly resemble interventions that applied behavior analysts have developed by more systematic means.

  10. IGENPRO knowledge-based operator support system

    International Nuclear Information System (INIS)

    Morman, J. A.

    1998-01-01

    Research and development is being performed on the knowledge-based IGENPRO operator support package for plant transient diagnostics and management to provide operator assistance during off-normal plant transient conditions. A generic thermal-hydraulic (T-H) first-principles approach is being implemented using automated reasoning, artificial neural networks and fuzzy logic to produce a generic T-H system-independent/plant-independent package. The IGENPRO package has a modular structure composed of three modules: the transient trend analysis module PROTREN, the process diagnostics module PRODIAG and the process management module PROMANA. Cooperative research and development work has focused on the PRODIAG diagnostic module of the IGENPRO package and the operator training matrix of transients used at the Braidwood Pressurized Water Reactor station. Promising simulator testing results with PRODIAG have been obtained for the Braidwood Chemical and Volume Control System (CVCS), and the Component Cooling Water System. Initial CVCS test results have also been obtained for the PROTREN module. The PROMANA effort also involves the CVCS. Future work will be focused on the long-term, slow and mild degradation transients where diagnoses of incipient T-H component failure prior to forced outage events is required. This will enhance the capability of the IGENPRO system as a predictive maintenance tool for plant staff and operator support

  11. Benchmarking European Gas Transmission System Operators

    DEFF Research Database (Denmark)

    Agrell, Per J.; Bogetoft, Peter; Trinkner, Urs

    This is the final report for the pan-European efficiency benchmarking of gas transmission system operations commissioned by the Netherlands Authority for Consumers and Markets (ACM), Den Haag, on behalf of the Council of European Energy Regulators (CEER) under the supervision of the authors....

  12. Operating System Support for Mobile Interactive Applications

    Science.gov (United States)

    2002-08-01

    Arpaci, and David E. Culler . Effective distributed scheduling of parallel workloads. In Proceedings of the Joint International Con- ference on Measurement... Jonathan Walpole. A feedback-driven proportion allocator for real-rate scheduling. In Proceedings of the 3rd Symposium on Operating Systems Design and

  13. Regolith Advanced Surface Systems Operations Robot Excavator

    Science.gov (United States)

    Mueller, Robert P.; Smith, Jonathan D.; Ebert, Thomas; Cox, Rachel; Rahmatian, Laila; Wood, James; Schuler, Jason; Nick, Andrew

    2013-01-01

    The Regolith Advanced Surface Systems Operations Robot (RASSOR) excavator robot is a teleoperated mobility platform with a space regolith excavation capability. This more compact, lightweight design (<50 kg) has counterrotating bucket drums, which results in a net-zero reaction horizontal force due to the self-cancellation of the symmetrical, equal but opposing, digging forces.

  14. 9 CFR 205.201 - System operator.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false System operator. 205.201 Section 205.201 Animals and Animal Products GRAIN INSPECTION, PACKERS AND STOCKYARDS ADMINISTRATION (PACKERS AND STOCKYARDS PROGRAMS), DEPARTMENT OF AGRICULTURE CLEAR TITLE-PROTECTION FOR PURCHASERS OF FARM PRODUCTS...

  15. Operating system verification—An overview

    Indian Academy of Sciences (India)

    Abstract. This paper gives a high-level introduction to the topic of formal, interactive, machine-checked software verification in general, and the verification of operating systems code in particular. We survey the state of the art, the advantages and limitations of machine-checked code proofs, and describe two specific ongoing ...

  16. Operating system design the Xinu approach

    CERN Document Server

    Comer, Douglas

    2015-01-01

    The book guides readers through the construction of a conventional process-based operating system using practical, straightforward primitives. It gives the implementation details of one set of primitives, usually the most popular set. Once readers understand how primitives can be implemented on conventional hardware, they can then easily implement alternative versions.

  17. International Benchmarking of Electricity Transmission System Operators

    DEFF Research Database (Denmark)

    Agrell, Per J.; Bogetoft, Peter

    2014-01-01

    Electricity transmission system operators (TSO) in Europe are increasing subject to high-powered performance-based regulation, such as revenue-cap regimes. The determination of the parameters in such regimes is challenging for national regulatory authorities (NRA), since there is normally a singl...... weight restrictions and a correction method for opening balances....

  18. Operating system verification—An overview

    Indian Academy of Sciences (India)

    2016-08-26

    Aug 26, 2016 ... This paper gives a high-level introduction to the topic of formal, interactive, machine-checked software verification in general, and the verification of operating systems code in particular. We survey the state of the art, the advantages and limitations of machine-checked code proofs, and describe two specific ...

  19. Poland health system review.

    Science.gov (United States)

    Sagan, Anna; Panteli, Dimitra; Borkowski, W; Dmowski, M; Domanski, F; Czyzewski, M; Gorynski, Pawel; Karpacka, Dorota; Kiersztyn, E; Kowalska, Iwona; Ksiezak, Malgorzata; Kuszewski, K; Lesniewska, A; Lipska, I; Maciag, R; Madowicz, Jaroslaw; Madra, Anna; Marek, M; Mokrzycka, A; Poznanski, Darius; Sobczak, Alicja; Sowada, Christoph; Swiderek, Maria; Terka, A; Trzeciak, Patrycja; Wiktorzak, Katarzyna; Wlodarczyk, Cezary; Wojtyniak, B; Wrzesniewska-Wal, Iwona; Zelwianska, Dobrawa; Busse, Reinhard

    2011-01-01

    Since the successful transition to a freely elected parliament and a market economy after 1989, Poland is now a stable democracy and is well represented within political and economic organizations in Europe and worldwide. The strongly centralized health system based on the Semashko model was replaced with a decentralized system of mandatory health insurance, complemented with financing from state and territorial self-government budgets. There is a clear separation of health care financing and provision: the National Health Fund (NFZ) the sole payer in the system is in charge of health care financing and contracts with public and non-public health care providers. The Ministry of Health is the key policy-maker and regulator in the system and is supported by a number of advisory bodies, some of them recently established. Health insurance contributions, borne entirely by employees, are collected by intermediary institutions and are pooled by the NFZ and distributed between the 16 regional NFZ branches. In 2009, Poland spent 7.4% of its gross domestic product (GDP) on health. Around 70% of health expenditure came from public sources and over 83.5% of this expenditure can be attributed to the (near) universal health insurance. The relatively high share of private expenditure is mostly represented by out-of-pocket (OOP) payments, mainly in the form of co-payments and informal payments. Voluntary health insurance (VHI) does not play an important role and is largely limited to medical subscription packages offered by employers. Compulsory health insurance covers 98% of the population and guarantees access to a broad range of health services. However, the limited financial resources of the NFZ mean that broad entitlements guaranteed on paper are not always available. Health care financing is overall at most proportional: while financing from health care contributions is proportional and budgetary subsidies to system funding are progressive, high OOP expenditures

  20. Review of secondary loop refrigeration systems

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Kai; Eisele, Magnus; Hwang, Yunho; Radermacher, Reinhard [Center for Environmental Energy Engineering, Department of Mechanical Engineering, University of Maryland, College Park, MD 20742 (United States)

    2010-03-15

    Due to the environmental damage caused by HFC refrigerants, there is an increasing universal interest to research environmentally friendly fluids in refrigerants and alternative approaches to the traditional DX refrigeration system. These refrigerants include ammonia, carbon dioxide, hydrocarbon, R152a and HFO1234yf. Major drawbacks of these refrigerants are their potential flammability and safety hazards. One way to overcome this issue is to use the new refrigerants in conjunction with a secondary loop refrigeration system. Additional benefits of the secondary loop refrigeration system are refrigerant charges, leakage reduction, potential maintenance simplification, and low operating cost. This article presents a comprehensive review of the secondary loop refrigeration systems. Furthermore, this review covers the performance and risk assessment of flammable refrigerants, secondary refrigerants and components of the secondary loop refrigeration system within the following applications: commercial refrigeration, residential air conditioning/heat pumping, and mobile air conditioning. (author)

  1. France: Health system review.

    Science.gov (United States)

    Chevreul, Karine; Durand-Zaleski, Isabelle; Bahrami, Stéphane Bahrami; Hernández-Quevedo, Cristina; Mladovsky, Philipa

    2010-01-01

    The Health Systems in Transition (HiT) profiles are country-based reports that provide a detailed description of a health system and of policy initiatives in progress or under development. HiTs examine different approaches to the organization, financing and delivery of health services and the role of the main actors in health systems; describe the institutional framework, process, content and implementation of health and health care policies; and highlight challenges and areas that require more in-depth analysis. The French health care system is a mix of public and private providers and insurers. Public insurance, financed by both employees and employer contributions and earmarked taxes, is compulsory and covers almost the whole population, while private insurance is of a complementary type and voluntary. Providers of outpatient care are largely private. Hospital beds are predominantly public or private non-profit-making. The French population enjoys good health and a high level of choice of providers. It is relatively satisfied with the health care system. However, as in many other countries, the rising cost of health care is of concern with regards to the objectives of the health care system. Many measures were or are being implemented in order to contain costs and increase efficiency. These include, for example, developing pay-for-performance for both hospitals and self-employed providers and increasing quality of professional practice; refining patient pathways; raising additional revenue for statutory health insurance (SHI); and increasing the role of voluntary health insurance (VHI). Meanwhile, socioeconomic disparities and geographic inequality in the density of health care professionals remain considerable challenges to providing a good level of equity in access to health care. Organizational changes at the regional level are important in attempting to tackle both equity and efficiency-related challenges. While the organizational structure of the system

  2. Denmark health system review.

    Science.gov (United States)

    Olejaz, Maria; Juul Nielsen, Annegrete; Rudkjøbing, Andreas; Okkels Birk, Hans; Krasnik, Allan; Hernández-Quevedo, Cristina

    2012-01-01

    Denmark has a tradition of a decentralized health system. However, during recent years, reforms and policy initiatives have gradually centralized the health system in different ways. The structural reform of 2007 merged the old counties into fewer bigger regions, and the old municipalities likewise. The hospital structure is undergoing similar reforms, with fewer, bigger and more specialized hospitals. Furthermore, a more centralized approach to planning and regulation has been taking place over recent years. This is evident in the new national planning of medical specialties as well as the establishment of a nationwide accreditation system, the Danish Healthcare Quality Programme, which sets national standards for health system providers in Denmark. Efforts have also been made to ensure coherent patient pathways - at the moment for cancer and heart disease - that are similar nationwide. These efforts also aim at improving intersectoral cooperation. Financially, recent years have seen the introduction of a higher degree of activity-based financing in the public health sector, combined with the traditional global budgeting.A number of challenges remain in the Danish health care system. The consequences of the recent reforms and centralization initiatives are yet to be fully evaluated. Before this happens, a full overview of what future reforms should target is not possible. Denmark continues to lag behind the other Nordic countries in regards to some health indicators, such as life expectancy. A number of risk factors may be the cause of this: alcohol intake and obesity continue to be problems, whereas smoking habits are improving. The level of socioeconomic inequalities in health also continues to be a challenge. The organization of the Danish health care system will have to take a number of challenges into account in the future. These include changes in disease patterns, with an ageing population with chronic and long-term diseases; ensuring sufficient staffing

  3. ENTERIC NERVOUS SYSTEM: A REVIEW

    OpenAIRE

    Kurt, Cansu; Göy, Defne Flora; Özden, Gülşah; Barutçu, Öykü; Bozer, Cüneyt

    2015-01-01

    Enteric nervous system directs and regulates the breakdown, absorption and elimination of food in our digestive system. However, alongside its digestive functions, enteric nervous system has also gained importance because of the discovery of its bidirectional link with intestinal flora, which has recently started to be considered as a separate organ in addiction to its digestive functions. Enteric nervous system contains approximately 100 million nerve cells, operates both independently and i...

  4. Greece: Health system review.

    Science.gov (United States)

    Economou, Charalambos

    2010-01-01

    The Health Systems in Transition (HiT) profiles are country-based reports that provide a detailed description of a health system and of policy initiatives in progress or under development. HiTs examine different approaches to the organization, financing and delivery of health services and the role of the main actors in health systems; describe the institutional framework, process, content and implementation of health and health care policies; and highlight challenges and areas that require more in-depth analysis. The health status of the Greek population has strongly improved over the last few decades and seems to compare relatively favourably with other OECD and European Union (EU) countries. The health system is a mixture of public integrated, public contract and public reimbursement models, comprising elements from both the public and private sectors and incorporating principles of different organizational patterns. Access to services is based on citizenship as well as on occupational status.The system is financed by the state budget, social insurance contributions and private payments.The largest share of health expenditure constitutes private expenditure, mainly in the form of out of pocket payments which is also the element contributing most to the overall increase in health expenditure. The delivery of health care services is based on both public and private providers. The presence of private providers is more obvious in primary care,especially in diagnostic technologies, private physicians' practices and pharmaceuticals. Despite success in improving the health of the population, the Greek health care system faces serious structural problems concerning the organization, financing and delivery of services. It suffers from the absence of cost-containment measures and defined criteria for funding, resulting in sickness funds experiencing economic constraints and budget deficits. The high percentage of private expenditure goes against the principle of fair

  5. The work of the Operational Safety Review Team (OSART)

    International Nuclear Information System (INIS)

    Hide, K.W.

    1996-01-01

    The Operational Safety Review Team (OSART) programme was set up by the IAEA in 1982 to assist Member States to enhance the operational safety of nuclear power plants. Each team is staffed by senior experts in the relevant fields. The review team discusses with plant staff the existing operational programmes for plant which may be under construction, being commissioned or already operating. Following a detailed examination of a safety programme, the OSART team lists strengths and weaknesses and makes recommendations on how to overcome the latter. Since their conclusions are based on the best prevailing international practice, they may be more stringent than those based on national criteria. The results of the 77 missions conducted at 62 plants in 28 countries by the end of 1994 are summarised. (UK)

  6. Operator interface to the ORIC control system

    International Nuclear Information System (INIS)

    Ludemann, C.A.; Casstevens, B.J.

    1983-01-01

    The Oak Ridge Isochronous Cyclotron (ORIC) was built in the early 1960s with a hard-wired manual control system. Presently, it serves as a variable-energy heavy-ion cyclotron with an internal ion source, or as an energy booster for the new 25 MV tandem electrostatic accelerator of the Holifield Heavy Ion Facility. One factor which has kept the cyclotron the productive research tool it is today is the gradual transfer of its control functions to a computer-based system beginning in the 1970s. This particular placement of a computer between an accelerator and its operators afforded some unique challenges and opportunities that would not be encountered today. Historically, the transformation began at a time when computers were just beginning to gain acceptance as reliable operational tools. Veteran operators with tens of years of accelerator experience justifiably expressed skepticism that this improvement would aid them, particularly if they had to re-learn how to operate the machine. The confidence of the operators was gained when they realized that one of the primary principles of ergonomics was being upheld. The computer software and hardware was being designed to serve them and not the computer

  7. Spain: Health system review.

    Science.gov (United States)

    García-Armesto, Sandra; Begoña Abadía-Taira, María; Durán, Antonio; Hernández-Quevedo, Cristina; Bernal-Delgado, Enrique

    2010-01-01

    The Health Systems in Transition (HiT) profiles are country-based reports that provide a detailed description of a health system and of policy initiatives in progress or under development. HiTs examine different approaches to the organization, financing and delivery of health services and the role of the main actors in health systems; describe the institutional framework, process, content and implementation of health and health care policies; and highlight challenges and areas that require more in-depth analysis. This edition of the Spanish HiT focuses on the consequences of the totally devolved status, consolidated in 2002, and the implementation of the road map established by the 2003 SNS Cohesion and Quality Act. Many of the steps already taken underline the improvement path chosen: the SNS Inter-territorial Council (CISNS) comprising the national and regional health ministries was upgraded to the highest SNS authority, paving the way for a brand new consensus-based policy-making process grounded in knowledge management; its effects are progressively starting to be evident. It led the way to the SNS common benefits basket or the SNS human resources policy framework, laying the cornerstones for coordination and the enactment of the SNS Quality Plan. The Plan includes the work in progress to implement the national health information system, the development of a single electronic clinical record (eCR) containing relevant clinical information guaranteeing to patients continuity of care outside their Autonomous Community (AC) of residence or a single patient ID to be used across the country, thus creating the basis for the SNS functional single insurer. It has also become one of the main drivers for the design, implementation and monitoring of quality standards across the SNS, developing national health strategies to tackle both most prevalent chronic diseases (e.g. cancer, cardiovascular diseases, diabetes) and rare diseases, as well as the National Strategy on

  8. Operations and Maintenance Cost for Stratified Buildings: A Critical Review

    OpenAIRE

    Che-Ghani Nor Zaimah; Myeda Nik Elyna; Ali Azlan Shah

    2016-01-01

    Building maintenance is essential in preserving buildings’ appearance and performance. It needs to upkeep the building performance to prolong its value and building life cycle. Malaysia is still lacking in managing cost for building operation and maintenance. It has been found that the cost for housing maintenance is high due to poor maintenance practices. In order to get better understanding on how to manage the cost, this study reviews the contributing factors that affecting operation and m...

  9. Review of Current Nuclear Vacuum System Technologies

    International Nuclear Information System (INIS)

    Carroll, M.; McCracken, J.; Shope, T.

    2003-01-01

    Nearly all industrial operations generate unwanted dust, particulate matter, and/or liquid wastes. Waste dust and particulates can be readily tracked to other work locations, and airborne particulates can be spread through ventilation systems to all locations within a building, and even vented outside the building - a serious concern for processes involving hazardous, radioactive, or nuclear materials. Several varieties of vacuum systems have been proposed and/or are commercially available for clean up of both solid and liquid hazardous and nuclear materials. A review of current technologies highlights both the advantages and disadvantages of the various systems, and demonstrates the need for a system designed to address issues specific to hazardous and nuclear material cleanup. A review of previous and current hazardous/nuclear material cleanup technologies is presented. From simple conventional vacuums modified for use in industrial operations, to systems specifically engineered for such purposes, the advantages and disadvantages are examined in light of the following criteria: minimal worker exposure; minimal secondary waste generation;reduced equipment maintenance and consumable parts; simplicity of design, yet fully compatible with all waste types; and ease of use. The work effort reviews past, existing and proposed technologies in light of such considerations. Accomplishments of selected systems are presented, including identified areas where technological improvements could be suggested

  10. An intelligent ground operator support system

    Science.gov (United States)

    Goerlach, Thomas; Ohlendorf, Gerhard; Plassmeier, Frank; Bruege, Uwe

    1994-01-01

    This paper presents first results of the project 'Technologien fuer die intelligente Kontrolle von Raumfahrzeugen' (TIKON). The TIKON objective was the demonstration of feasibility and profit of the application of artificial intelligence in the space business. For that purpose a prototype system has been developed and implemented for the operation support of the Roentgen Satellite (ROSAT), a scientific spacecraft designed to perform the first all-sky survey with a high-resolution X-ray telescope and to investigate the emission of specific celestial sources. The prototype integrates a scheduler and a diagnosis tool both based on artificial intelligence techniques. The user interface is menu driven and provides synoptic displays for the visualization of the system status. The prototype has been used and tested in parallel to an already existing operational system.

  11. Hungary health system review.

    Science.gov (United States)

    Gaal, Peter; Szigeti, Szabolcs; Csere, Marton; Gaskins, Matthew; Panteli, Dimitra

    2011-01-01

    Hungary has achieved a successful transition from an overly centralized, integrated Semashko-style health care system to a purchaser provider split model with output-based payment methods. Although there have been substantial increases in life expectancy in recent years among both men and women, many health outcomes remain poor, placing Hungary among the countries with the worst health status and highest rate of avoidable mortality in the EU (life expectancy at birth trailed the EU27 average by 5.1 years in 2009). Lifestyle factors especially the traditionally unhealthy Hungarian diet, alcohol consumption and smoking play a very important role in shaping the overall health of the population.In the single-payer system, the recurrent expenditure on health services is funded primarily through compulsory, non-risk-related contributions made by eligible individuals or from the state budget. The central government has almost exclusive power to formulate strategic direction and to issue and enforce regulations regarding health care. In 2009 Hungary spent 7.4% of its gross domestic product (GDP) on health, with public expenditure accounting for 69.7% of total health spending, and with health expenditure per capita ranking slightly above the average for the new EU Member States, but considerably below the average for the EU27 in 2008. Health spending has been unstable over the years, with several waves of increases followed by longer periods of cost-containment and budget cuts. The share of total health expenditure attributable to private sources has been increasing, most of it accounted for by out-of-pocket (OOP) expenses. A substantial share of the latter can be attributed to informal payments, which are a deeply rooted characteristic of the Hungarian health system and a source of inefficiency and inequity. Voluntary health insurance, on the other hand, amounted to only 7.4% of private and 2.7% of total health expenditure in 2009. Revenue sources for health have been

  12. Reducing an attack surface of an operating system

    OpenAIRE

    VALKONEN, VILLE

    2012-01-01

    Certain security choices done on the operating system level can mitigate harm done by an malicious attacker or a program. The main focus in the thesis is on open source operating systems. Asiasanat: software security, operating system security

  13. International Benchmarking of Electricity Transmission System Operators

    DEFF Research Database (Denmark)

    Agrell, Per J.; Bogetoft, Peter

    2014-01-01

    Electricity transmission system operators (TSO) in Europe are increasing subject to high-powered performance-based regulation, such as revenue-cap regimes. The determination of the parameters in such regimes is challenging for national regulatory authorities (NRA), since there is normally a single...... TSO operating in each jurisdiction. The solution for European regulators has been found in international regulatory benchmarking, organized in collaboration with the Council of European Energy Regulators (CEER) in 2008 and 2012 for 22 and 23 TSOs, respectively. The frontier study provides static cost...

  14. Operations and Maintenance Cost for Stratified Buildings: A Critical Review

    Directory of Open Access Journals (Sweden)

    Che-Ghani Nor Zaimah

    2016-01-01

    Full Text Available Building maintenance is essential in preserving buildings’ appearance and performance. It needs to upkeep the building performance to prolong its value and building life cycle. Malaysia is still lacking in managing cost for building operation and maintenance. It has been found that the cost for housing maintenance is high due to poor maintenance practices. In order to get better understanding on how to manage the cost, this study reviews the contributing factors that affecting operation and maintenance cost of stratified buildings in Malaysia. The research first identified the factors through extensive literature review and scrutinize on factors that affecting and can minimize operation and maintenance cost. This literature review offers insight into building maintenance scenario in Malaysia focusing on the issues and challenges. The study also finds that operation and maintenance cost for housing in Malaysia is still in poor state. Interestingly, this paper revealed that operation and maintenance cost is also influenced by three significant factors like expectation of tenants, building characteristics and building defects. Measures to reduce the housing operation and maintenance cost are also highlighted so that this study can be a stepping stone towards proposing efficient and effective facilities management strategies for affordable housing in future.

  15. Zope based electronic operation log system - Zlog

    International Nuclear Information System (INIS)

    Yoshii, K.; Satoh, Y.; Kitabayashi, T.

    2004-01-01

    Since January 2004, the Zope based electronic operation logging system, named Zlog, has been running at the KEKB and AR accelerator facilities. Since Zope is the python based open source web application server software and python language is familiar for the members in the KEKB accelerator control group, we have developed the Zlog system rapidly. In this paper, we report the development history and the present status of Zlog system. Also we show some general plug-in components, called Zope products, have been useful for our Zlog development. (author)

  16. Systemic mastocytosis - A systematic review

    DEFF Research Database (Denmark)

    Andersen, C.L.; Hasselbalch, H.C.; Kristensen, T.K.

    2012-01-01

    of the cell has been described and its fascinating biology has only recently been depicted. We here give a review of systemic mastocytosis in regards to cell biology, diagnostic approaches and clinical practice. METHODS: A search was made in PubMed in August 2011 entering the keywords: mastocytosis, (systemic...

  17. Programming languages and operating systems used in data base systems

    International Nuclear Information System (INIS)

    Radulescu, T.G.

    1977-06-01

    Some apsects of the use of the programming languages and operating systems in the data base systems are presented. There are four chapters in this paper. In the first chapter we present some generalities about the programming languages. In the second one we describe the use of the programming languages in the data base systems. A classification of the programming languages used in data base systems is presented in the third one. An overview of the operating systems is made in the last chapter. (author)

  18. Kyrgyzstan: Health system review.

    Science.gov (United States)

    Ibraimova, Ainura; Akkazieva, Baktygul; Ibraimov, Aibek; Manzhieva, Elina; Rechel, Bernd

    2011-01-01

    Kyrgyzstan has undertaken wide-ranging reforms of its health system in a challenging socioeconomic and political context. The country has developed two major health reform programmes after becoming independent: Manas (1996 to 2006) and Manas Taalimi (2006 to 2010). These reforms introduced comprehensive structural changes to the health care delivery system with the aim of strengthening primary health care, developing family medicine and restructuring the hospital sector.Major service delivery improvements have included the introduction of new clinical practice guidelines, improvements in the provision and use of pharmaceuticals, quality improvements in the priority programmes for mother and child health, cardiovascular diseases, tuberculosis and HIV/AIDS, strengthening of public health and improvements in medical education. A Community Action for Health programme was introduced through new village health committees, enhancing health promotion and allowing individuals and communities to take more responsibility for their own health. Health financing reform consisted of the introduction of a purchaser provider split and the establishment of a single payer for health services under the state-guaranteed benefit package (SGBP). Responsibility for purchasing health services has been consolidated under the Mandatory Health Insurance Fund (MHIF), which pools general revenue and health insurance funding. Funds have been pooled at national level since 2006, replacing the previous pooling at oblast level. The transition from oblast-based pooling of funds to pooling at the national level allowed the MHIF to distribute funds more equitably for the SGBP and the Additional Drug Package. Although utilization of both primary care and hospital services declined during the 1990s and early 2000s, it is increasing again. There is increasing equality of access across regions, improved financial protection and a decline in informal payments, but more efforts will be required in these

  19. Constructing Secure Mobile Agent Systems Using the Agent Operating System

    NARCIS (Netherlands)

    van t Noordende, G.J.; Overeinder, B.J.; Timmer, R.J.; Brazier, F.M.; Tanenbaum, A.S.

    2009-01-01

    Designing a secure and reliable mobile agent system is a difficult task. The agent operating system (AOS) is a building block that simplifies this task. AOS provides common primitives required by most mobile agent middleware systems, such as primitives for secure communication, secure and

  20. A Practical Review of Studies on Operator's Supervisory Monitoring Behavior

    International Nuclear Information System (INIS)

    Ha, Jun Su; Seong, Poong Hyun

    2009-01-01

    Correct situation awareness (SA) has been considered a crucial key to improving performance and reducing error in NPPs. There are a lot of information sources that should be monitored in NPPs, but operators have only limited capacity of attention and memory. Operators in NPPs selectively attend to important information sources to effectively develop SA when an abnormal or accidental situation occurs. Selective attention to important information sources is continued while maintaining SA as well. In this work, various models of operator's visual sampling behavior are reviewed for the use in human factors studies in NPPs

  1. Transport systems research vehicle color display system operations manual

    Science.gov (United States)

    Easley, Wesley C.; Johnson, Larry E.

    1989-01-01

    A recent upgrade of the Transport Systems Research Vehicle operated by the Advanced Transport Operating Systems Program Office at the NASA Langley Research Center has resulted in an all-glass panel in the research flight deck. Eight ARINC-D size CRT color displays make up the panel. A major goal of the display upgrade effort was ease of operation and maintenance of the hardware while maintaining versatility needed for flight research. Software is the key to this required versatility and will be the area demanding the most detailed technical design expertise. This document is is intended to serve as a single source of quick reference information needed for routine operation and system level maintenance. Detailed maintenance and modification of the display system will require specific design documentation and must be accomplished by individuals with specialized knowledge and experience.

  2. Review of nuclear power plant systems

    International Nuclear Information System (INIS)

    Doehler

    1980-01-01

    This presentation starts with a brief description of the Technischer Ueberwachungs-Verein (TUeV) and its main activities in the field of technical assessments. The TUeV-organisation is in general the assessor who performs the review if nuclear power plant systems, structures and equipment. All aspects relating to the safe operation of nuclear power plants are assessed by the TUeV. This paper stresses the review of the design of nuclear power plant systems and structures. It gives an outline on the procedure of an assessment, starting with the regulatory requirements, going into the papers of the applicant and finally ending with the TUeV-appraisal. This procedure is shown using settlement measuring requirements as an example. The review of the design of mechanical structures such as pipes, valves, pump and vessels is shown in detail. (RW)

  3. Transferring Knowledge from Building Operation to Design: A literature review

    DEFF Research Database (Denmark)

    Rasmussen, Helle Lohmann; Jensen, Per Anker; Gregg, Jay Sterling

    . Knowing that the list lacks inputs from cultural and organizational theory, the paper suggests that further research should focus on taking these suggestions to an operational level for the benefit of FM, building clients and design teams. Furthermore, it is found that major concepts that could......, UK, Denmark, Saudi Arabia, and Malaysia are represented in the review....

  4. Microsoft operating systems development and strategy : an assessment of the Windows 2000 Server operating system

    OpenAIRE

    Oakes, David R.

    1999-01-01

    Microsoft began development of Windows NT in the late 1980s as an applied research and development project. Since then it has become the number one network operating system on the market. With the release of Windows 2000, Microsoft has followed through on its strategy of operating system consolidation and formed a new family of servers. The Windows 2000 Server Family is the next generation of Windows NT and consolidates many of the features of Windows 95/98 into its operating system. This the...

  5. PYROLASER - PYROLASER OPTICAL PYROMETER OPERATING SYSTEM

    Science.gov (United States)

    Roberts, F. E.

    1994-01-01

    The PYROLASER package is an operating system for the Pyrometer Instrument Company's Pyrolaser. There are 6 individual programs in the PYROLASER package: two main programs, two lower level subprograms, and two programs which, although independent, function predominantly as macros. The package provides a quick and easy way to setup, control, and program a standard Pyrolaser. Temperature and emissivity measurements may be either collected as if the Pyrolaser were in the manual operations mode, or displayed on real time strip charts and stored in standard spreadsheet format for post-test analysis. A shell is supplied to allow macros, which are test-specific, to be easily added to the system. The Pyrolaser Simple Operation program provides full on-screen remote operation capabilities, thus allowing the user to operate the Pyrolaser from the computer just as it would be operated manually. The Pyrolaser Simple Operation program also allows the use of "quick starts". Quick starts provide an easy way to permit routines to be used as setup macros for specific applications or tests. The specific procedures required for a test may be ordered in a sequence structure and then the sequence structure can be started with a simple button in the cluster structure provided. One quick start macro is provided for continuous Pyrolaser operation. A subprogram, Display Continuous Pyr Data, is used to display and store the resulting data output. Using this macro, the system is set up for continuous operation and the subprogram is called to display the data in real time on strip charts. The data is simultaneously stored in a spreadsheet format. The resulting spreadsheet file can be opened in any one of a number of commercially available spreadsheet programs. The Read Continuous Pyrometer program is provided as a continuously run subprogram for incorporation of the Pyrolaser software into a process control or feedback control scheme in a multi-component system. The program requires the

  6. Backfit modifications to operating radwaste systems

    International Nuclear Information System (INIS)

    Giorgione, D.M.; Dresser, C.D.; Irving, T.J.; La Marca, J.T.

    1984-01-01

    A comprehensive radwaste modification project to replace corroded tanks and piping and increase liquid radwaste storage capacity is described. The major factor potentially affecting both schedule and cost is the low labor productivity associated with work in radiation areas. Engineering design and construction planning activities were formulated to minimize the impact on system operation and control exposure during construction. A detailed Health Physics Plan was developed which provides for decontamination of work areas consistent with ALARA/cost benefit considerations

  7. The Human-Robot Interaction Operating System

    Science.gov (United States)

    Fong, Terrence; Kunz, Clayton; Hiatt, Laura M.; Bugajska, Magda

    2006-01-01

    In order for humans and robots to work effectively together, they need to be able to converse about abilities, goals and achievements. Thus, we are developing an interaction infrastructure called the "Human-Robot Interaction Operating System" (HRI/OS). The HRI/OS provides a structured software framework for building human-robot teams, supports a variety of user interfaces, enables humans and robots to engage in task-oriented dialogue, and facilitates integration of robots through an extensible API.

  8. Peer Reviews: a voluntary means of enhancing operating culture

    International Nuclear Information System (INIS)

    Vella, R.

    1996-01-01

    In the nuclear energy industry, and also in other fields, excellent experience has been gained from the regular accumulation of expert evidence of power station operation through external organizations or teams. In 1991, the World Association of Nuclear Operations (WANO) initiated a pilot programme for voluntary 'Peer Reviews'. The success of this first exercise in gathering expert evidence led to the introduction of the 'Peer Review' programme in 1993 as one of the standard programmes of WANO. The object was to increase the safety and reliability of nuclear power stations throughout the world. WANO Peer Reviews are voluntary and are carried out at the request of a member. They are oriented towards special WANO performance objectives and criteria, which have been established by the management of WANO. (orig.) [de

  9. Systems pathology: a critical review.

    Science.gov (United States)

    Costa, Jose

    2012-02-01

    The technological advances of the last twenty years together with the dramatic increase in computational power have injected new life into systems-level thinking in Medicine. This review emphasizes the close relationship of Systems Pathology to Systems Biology and delineates the differences between Systems Pathology and Clinical Systems Pathology. It also suggests an algorithm to support the application of systems-level thinking to clinical research, proposes applying systems-level thinking to the health care systems and forecasts an acceleration of preventive medicine as a result of the coupling of personal genomics with systems pathology. Copyright © 2011 Federation of European Biochemical Societies. Published by Elsevier B.V. All rights reserved.

  10. A systematic review of peri-operative melatonin

    DEFF Research Database (Denmark)

    Andersen, L P H; Werner, M U; Rosenberg, J

    2014-01-01

    We systematically reviewed randomised controlled trials of peri-operative melatonin. We included 24 studies of 1794 participants that reported eight peri-operative outcomes: anxiety; analgesia; sleep quality; oxidative stress; emergence behaviour; anaesthetic requirements; steal induction......; and safety. Compared with placebo, melatonin reduced the standardised mean difference (95% CI) pre-operative anxiety score by 0.88 (0.44-1.33) and postoperative pain score by 1.06 (0.23-1.88). The magnitude of effect was unreliable due to substantial statistical heterogeneity, with I(2) 87% and 94......%, respectively. Qualitative reviews suggested the melatonin improved sleep quality and emergence behaviour, and might be capable of reducing oxidative stress and anaesthetic requirements....

  11. European Flood Awareness System - now operational

    Science.gov (United States)

    Alionte Eklund, Cristina.; Hazlinger, Michal; Sprokkereef, Eric; Garcia Padilla, Mercedes; Garcia, Rafael J.; Thielen, Jutta; Salamon, Peter; Pappenberger, Florian

    2013-04-01

    The European Commission's Communication "Towards a Stronger European Union Disaster Response" adopted and endorsed by the Council in 2010, underpins the importance of strengthening concerted actions for natural disasters including floods, which are amongst the costliest natural disasters in the EU. The European Flood Awareness System (EFAS) contributes in the case of major flood events. to better protection of the European Citizen, the environment, property and cultural heritage. The disastrous floods in Elbe and Danube rivers in 2002 confronted the European Commission with non-coherent flood warning information from different sources and of variable quality, complicating planning and organisation of aid. Thus, the Commission initiated the development of a European Flood Awareness System (EFAS) which is now going operational. EFAS has been developed and tested at the Joint Research Centre, the Commission's in house science service, in close collaboration with the National hydrological and meteorological services, European Civil Protection through the Monitoring and Information Centre (MIC) and other research institutes. EFAS provides Pan-European overview maps of flood probabilities up to 10 days in advance as well as detailed forecasts at stations where the National services are providing real time data. More than 30 hydrological services and civil protection services in Europe are part of the EFAS network. Since 2011, EFAS is part of the COPERNICUS Emergency Management Service, (EMS) and is now an operational service since 2012. The Operational EFAS is being executed by several consortia dealing with different operational aspects: • EFAS Hydrological data collection centre —REDIAM and ELIMCO- will be collecting historic and realtime discharge and water levels data in support to EFAS • EFAS Meteorological data collection centre —outsourced but running onsite of JRC Ispra. Will be collecting historic and realtime meteorological data in support to EFAS

  12. Computer aided operation of complex systems

    International Nuclear Information System (INIS)

    Goodstein, L.P.

    1985-09-01

    Advanced technology is having the effect that industrial systems are becoming more highly automated and do not rely on human intervention for the control of normally planned and/or predicted situations. Thus the importance of the operator has shifted from being a manual controller to becoming more of a systems manager and supervisory controller. At the same time, the use of advanced information technology in the control room and its potential impact on human-machine capabilities places additional demands on the designer. This report deals with work carried out to describe the plant-operator relationship in order to systematize the design and evaluation of suitable information systems in the control room. This design process starts with the control requirements from the plant and transforms them into corresponding sets of decision-making tasks with appropriate allocation of responsibilities between computer and operator. To further effectivize this cooperation, appropriate information display and accession are identified. The conceptual work has been supported by experimental studies on a small-scale simulator. (author)

  13. Expert System Software Assistant for Payload Operations

    Science.gov (United States)

    Rogers, Mark N.

    1997-01-01

    The broad objective of this expert system software based application was to demonstrate the enhancements and cost savings that can be achieved through expert system software utilization in a spacecraft ground control center. Spacelab provided a valuable proving ground for this advanced software technology; a technology that will be exploited and expanded for future ISS operations. Our specific focus was on demonstrating payload cadre command and control efficiency improvements through the use of "smart" software which monitors flight telemetry, provides enhanced schematic-based data visualization, and performs advanced engineering data analysis.

  14. Embedded Operating System for MicroBlaze

    Directory of Open Access Journals (Sweden)

    M. Šimek

    2006-01-01

    Full Text Available This paper presents a work in progress on experiments with embedded operating systems for the MicroBlaze processor. Modern embedded systems based on a configurable platform incorporating a similar processor core are gaining importance with the ongoing effort to minimize cost and development time. After an overview of the configurable platform based on this processor core, we devote our attention to uClinux OS. This OS has been successfully ported for the MicroBlaze processor, and we present our current experience with it. At the end of the paper we discuss several possible booting strategies and recommend further development of U-BOOT. 

  15. Operating System For Numerically Controlled Milling Machine

    Science.gov (United States)

    Ray, R. B.

    1992-01-01

    OPMILL program is operating system for Kearney and Trecker milling machine providing fast easy way to program manufacture of machine parts with IBM-compatible personal computer. Gives machinist "equation plotter" feature, which plots equations that define movements and converts equations to milling-machine-controlling program moving cutter along defined path. System includes tool-manager software handling up to 25 tools and automatically adjusts to account for each tool. Developed on IBM PS/2 computer running DOS 3.3 with 1 MB of random-access memory.

  16. Independent Quality Control Review of EPA OIG Operations

    Science.gov (United States)

    The review considers selected audit work performed by EPA OIG, Office of Audit, Congressional and Public Liaison, Mission Systems, and Program Evaluation, during the period for 1 October 2006 through 30 September 2007 .

  17. CARMENES instrument control system and operational scheduler

    Science.gov (United States)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    The main goal of the CARMENES instrument is to perform high-accuracy measurements of stellar radial velocities (1m/s) with long-term stability. CARMENES will be installed in 2015 at the 3.5 m telescope in the Calar Alto Observatory (Spain) and it will be equipped with two spectrographs covering from the visible to the near-infrared. It will make use of its near-IR capabilities to observe late-type stars, whose peak of the spectral energy distribution falls in the relevant wavelength interval. The technology needed to develop this instrument represents a challenge at all levels. We present two software packages that play a key role in the control layer for an efficient operation of the instrument: the Instrument Control System (ICS) and the Operational Scheduler. The coordination and management of CARMENES is handled by the ICS, which is responsible for carrying out the operations of the different subsystems providing a tool to operate the instrument in an integrated manner from low to high user interaction level. The ICS interacts with the following subsystems: the near-IR and visible channels, composed by the detectors and exposure meters; the calibration units; the environment sensors; the front-end electronics; the acquisition and guiding module; the interfaces with telescope and dome; and, finally, the software subsystems for operational scheduling of tasks, data processing, and data archiving. We describe the ICS software design, which implements the CARMENES operational design and is planned to be integrated in the instrument by the end of 2014. The CARMENES operational scheduler is the second key element in the control layer described in this contribution. It is the main actor in the translation of the survey strategy into a detailed schedule for the achievement of the optimization goals. The scheduler is based on Artificial Intelligence techniques and computes the survey planning by combining the static constraints that are known a priori (i.e., target

  18. An operational fluorescence system for crop assessment

    Science.gov (United States)

    Belzile, Charles; Belanger, Marie-Christine; Viau, Alain A.; Chamberland, Martin; Roy, Simon

    2004-03-01

    The development of precision farming requires new tools for plant nutritional stress monitoring. An operational fluorescence system has been designed for vegetation status mapping and stress detection at plant and field scale. The instrument gives relative values of fluorescence at different wavelengths induced by the two-excitation sources. Lightinduced fluorescence has demonstrated successful crop health monitoring and plant nutritional stress detection capabilities. The spectral response of the plants has first been measured with an hyperspectral imager using laser-induced fluorescence. A tabletop imaging fluorometer based on flash lamp technology has also been designed to study the spatial distribution of fluorescence on plant leaves. For field based non-imaging system, LED technology is used as light source to induce fluorescence of the plant. The operational fluorescence system is based on ultraviolet and blue LED to induce fluorescence. Four narrow fluorescence bands centered on 440, 520, 690 and 740nm are detected. The instrument design includes a modular approach for light source and detector. It can accommodate as many as four different light sources and six bands of fluorescence detection. As part of the design for field application, the instrument is compatible with a mobile platform equipped with a GPS and data acquisition system. The current system developed by Telops/GAAP is configured for potato crops fluorescence measurement but can easily be adapted for other crops. This new instrument offers an effective and affordable solution for precision farming.

  19. Smart Shipboard Power System Operation and Management

    DEFF Research Database (Denmark)

    Kanellos, Fotis D.; Anvari-Moghaddam, Amjad; Guerrero, Josep M.

    2016-01-01

    During recent years, optimal electrification of isolated offshore systems has become increasingly important and received extensive attention from the maritime industry. Especially with the introduction of electric propulsion, which has led to a total electrification of shipboard power systems known...... as all-electric ships (AESs), the need for more cost-effective and emission-aware solutions is augmented. Such onboard systems are prone to sudden load variations due to the changing weather conditions as well as mission profile, thus they require effective power management systems (PMSs) to operate...... optimally under different working conditions. In this paper, coordinated optimal power management at the supply/demand side of a given AES is studied with regard to different objectives and related technical/environmental constraints. The optimal power management problem is formulated as a mixed...

  20. How can a change in the operating system of the mental health review board promote the discharge of long-term hospitalized psychiatric patients? A case study of Seoul city.

    Science.gov (United States)

    Lee, Myung-Soo; Lim, Hee-Young; Kim, Youngki; Lee, Yong-Suk

    2014-01-01

    One of the most typical and chronic problem in Korean mental health system is the prolonged length of hospital stay. In contrast to there are many components which leads to long length of stay of psychiatric patients in Korean situation such as low and fixed medical fee for psychiatric inpatient treatment, shortage of community resources, lack of care-givers' awareness and so on, there are just few mechanisms to handle this issue such as Mental Health Review Board (MHRB) which is based on Mental Health Act since 1995. However, the discharge order rate was very low and there community care system after discharge order is still very weak. The Korean government has revised the Mental Health Act in 2008 and changed the operating principals of the MHRB from a regional level to a local level to strengthen the function of MHRB. However, the discharge order rate versus the whole evaluation requests still remains at a very low level or less than 5%. And it is still very difficult to execute a discharge order against a patient whose symptoms and conditions become psychiatrically stabilized enough for discharge, due to a shortage of community care facilities and a lack of social support system. These results are exactly same with former studies. Any policies to promote psychiatric discharge including MHRB are needed to take the comprehensive factors into consideration, such as payment program, community infrastructure, increasing care-givers' acceptance and so on. Despite of the political trial of Korean government to reduce length of stay of chronic psychiatric patients, it was not successful. Still it had failed to propose a detailed policy measure in terms of the above-mentioned prerequisites. Therefore, new system and program developments including reform of payment system which reflect prior studies' recommendations are essential.

  1. Safety status system for operating room devices.

    Science.gov (United States)

    Guédon, Annetje C P; Wauben, Linda S G L; Overvelde, Marlies; Blok, Joleen H; van der Elst, Maarten; Dankelman, Jenny; van den Dobbelsteen, John J

    2014-01-01

    Since the increase of the number of technological aids in the operating room (OR), equipment-related incidents have come to be a common kind of adverse events. This underlines the importance of adequate equipment management to improve the safety in the OR. A system was developed to monitor the safety status (periodic maintenance and registered malfunctions) of OR devices and to facilitate the notification of malfunctions. The objective was to assess whether the system is suitable for use in an busy OR setting and to analyse its effect on the notification of malfunctions. The system checks automatically the safety status of OR devices through constant communication with the technical facility management system, informs the OR staff real-time and facilitates notification of malfunctions. The system was tested for a pilot period of six months in four ORs of a Dutch teaching hospital and 17 users were interviewed on the usability of the system. The users provided positive feedback on the usability. For 86.6% of total time, the localisation of OR devices was accurate. 62 malfunctions of OR devices were reported, an increase of 12 notifications compared to the previous year. The safety status system was suitable for an OR complex, both from a usability and technical point of view, and an increase of reported malfunctions was observed. The system eases monitoring the safety status of equipment and is a promising tool to improve the safety related to OR devices.

  2. E-commerce Review System to Detect False Reviews.

    Science.gov (United States)

    Kolhar, Manjur

    2017-08-15

    E-commerce sites have been doing profitable business since their induction in high-speed and secured networks. Moreover, they continue to influence consumers through various methods. One of the most effective methods is the e-commerce review rating system, in which consumers provide review ratings for the products used. However, almost all e-commerce review rating systems are unable to provide cumulative review ratings. Furthermore, review ratings are influenced by positive and negative malicious feedback ratings, collectively called false reviews. In this paper, we proposed an e-commerce review system framework developed using the cumulative sum method to detect and remove malicious review ratings.

  3. RASSOR - Regolith Advanced Surface Systems Operations Robot

    Science.gov (United States)

    Gill, Tracy R.; Mueller, Rob

    2015-01-01

    The Regolith Advanced Surface Systems Operations Robot (RASSOR) is a lightweight excavator for mining in reduced gravity. RASSOR addresses the need for a lightweight (robot that is able to overcome excavation reaction forces while operating in reduced gravity environments such as the moon or Mars. A nominal mission would send RASSOR to the moon to operate for five years delivering regolith feedstock to a separate chemical plant, which extracts oxygen from the regolith using H2 reduction methods. RASSOR would make 35 trips of 20 kg loads every 24 hours. With four RASSORs operating at one time, the mission would achieve 10 tonnes of oxygen per year (8 t for rocket propellant and 2 t for life support). Accessing craters in space environments may be extremely hard and harsh due to volatile resources - survival is challenging. New technologies and methods are required. RASSOR is a product of KSC Swamp Works which establishes rapid, innovative and cost effective exploration mission solutions by leveraging partnerships across NASA, industry and academia.

  4. Hanford Environmental Information System (HEIS) Operator`s Manual. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, R.I.

    1991-10-01

    The Hanford Environmental Information System (HEIS) is a consolidated set of automated resources that effectively manage the data gathered during environmental monitoring and restoration of the Hanford Site. The HEIS includes an integrated database that provides consistent and current data to all users and promotes sharing of data by the entire user community. This manual describes the facilities available to the operational user who is responsible for data entry, processing, scheduling, reporting, and quality assurance. A companion manual, the HEIS User`s Manual, describes the facilities available-to the scientist, engineer, or manager who uses the system for environmental monitoring, assessment, and restoration planning; and to the regulator who is responsible for reviewing Hanford Site operations against regulatory requirements and guidelines.

  5. The Linux operating system: An introduction

    Science.gov (United States)

    Bokhari, Shahid H.

    1995-01-01

    Linux is a Unix-like operating system for Intel 386/486/Pentium based IBM-PCs and compatibles. The kernel of this operating system was written from scratch by Linus Torvalds and, although copyrighted by the author, may be freely distributed. A world-wide group has collaborated in developing Linux on the Internet. Linux can run the powerful set of compilers and programming tools of the Free Software Foundation, and XFree86, a port of the X Window System from MIT. Most capabilities associated with high performance workstations, such as networking, shared file systems, electronic mail, TeX, LaTeX, etc. are freely available for Linux. It can thus transform cheap IBM-PC compatible machines into Unix workstations with considerable capabilities. The author explains how Linux may be obtained, installed and networked. He also describes some interesting applications for Linux that are freely available. The enormous consumer market for IBM-PC compatible machines continually drives down prices of CPU chips, memory, hard disks, CDROMs, etc. Linux can convert such machines into powerful workstations that can be used for teaching, research and software development. For professionals who use Unix based workstations at work, Linux permits virtually identical working environments on their personal home machines. For cost conscious educational institutions Linux can create world-class computing environments from cheap, easily maintained, PC clones. Finally, for university students, it provides an essentially cost-free path away from DOS into the world of Unix and X Windows.

  6. Toast: The power system operators assistant

    Energy Technology Data Exchange (ETDEWEB)

    Talukdar, S.N.; Cardozo, E.; Leao, L.

    1986-07-01

    The environments in which power system operators work are becoming more complex. New constraints are appearing, old constraints are tightening, and the number of decision variables is increasing. To cope with these trends, operators need intelligent assistants to help manage information and lighten their decision-making burdens. Such assistants can be divided into two types: Phase-1 assistants for off-line uses and Phase-2 assistants for on-line uses and Phase-2 assistants for on-line, real-time uses. Toast is an evolving Phase-1 assistant. Of the nine possible functions of an assistant, Toast has immediate potential in two-diagnosis and criticism. Its diagnostic knowledge, though hardly complete, is extensive enough to be useful to human operators. In contrast, its abilities to critique proposed courses of action are much less developed and, as yet, consist only of facilities to simulate some of the these courses of action. Toast has been written in Cops, a programming environment that allows for distributed processing and has a readily extensible library of both symbolic and numerical programs. These features should make the task of expanding Toast relatively painless. Of the many directions in which expansions could occur, we plan on adding diagnostic capabilities in the area of power system security. This area was identified in a study as the most worthy of development.

  7. Independent System Operators and Biomass Power

    International Nuclear Information System (INIS)

    Porter, Kevin L.

    1999-01-01

    Since the Federal Energy Regulatory Commission issued its landmark open access transmission rule in 1996, the idea of creating and establishing independent system operators (ISOs) has gained momentum. ISOs may help combine individual utility transmission systems into more regional transmission networks, which ultimately will allow biomass companies to transmit power over longer distances while paying a single transmission rate. To the extent that ISOs are combined or operated with power exchanges, however, biomass companies will likely face even more competitive market pressures. Few operators have experience with ISOs and power exchanges, but preliminary results show that short-term electricity market prices are probably too low for most biomass companies to compete against. Without policy measures, biomass companies may have to pursue strategic opportunities with short-term, spot-market sales; direct bilateral sales to customers; alternative power exchanges; and perhaps a ''green'' power market and sales to ancillary service markets. In addition, prices will likely be more volatile in a restructured market so biomass generators should be selling during those times

  8. The limitations in implementing and operating a rapid response system.

    Science.gov (United States)

    Subramaniam, A; Botha, J; Tiruvoipati, R

    2016-10-01

    Despite the widespread introduction of rapid response systems (RRS)/medical emergency teams (MET), there is still controversy regarding how effective they are. While there are some observational studies showing improved outcomes with RRS, there are no data from randomised controlled trials to support the effectiveness. Nevertheless, the MET system has become a standard of care in many healthcare organisations. In this review, we present an overview of the limitations in implementing and operating a RRS in modern healthcare. © 2016 Royal Australasian College of Physicians.

  9. Integrating Solar PV in Utility System Operations

    Energy Technology Data Exchange (ETDEWEB)

    Mills, A.; Botterud, A.; Wu, J.; Zhou, Z.; Hodge, B-M.; Heany, M.

    2013-10-31

    This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved

  10. Operational strategy of adsorption desalination systems

    KAUST Repository

    Thu, Kyaw

    2009-03-01

    This paper presents the performances of an adsorption desalination (AD) system in two-bed and four-bed operational modes. The tested results are calculated in terms of key performance parameters namely, (i) specific daily water production (SDWP), (ii) cycle time, and (iii) performance ratio (PR) for various heat source temperatures, mass flow rates, cycle times along with a fixed heat sink temperature. The optimum input parameters such as driving heat source and cycle time of the AD cycle are also evaluated. It is found from the present experimental data that the maximum potable water production per tonne of adsorbent (silica gel) per day is about 10 m3 whilst the corresponding performance ratio is 0.61, and a longer cycle time is required to achieve maximum water production at lower heat source temperatures. This paper also provides a useful guideline for the operational strategy of the AD cycle. © 2008 Elsevier Ltd. All rights reserved.

  11. Systematising "System": One Reviewer's Analysis of the Review Process

    Science.gov (United States)

    Coniam, David

    2011-01-01

    This paper describes one reviewer's experience of reviewing for the journal "System" over an eight-year period, 2003-2011. The paper reports on the reviews produced by the single reviewer, which have been compiled into a specific purpose--an "occluded"--corpus (Swales, 1996) of 122 reviews, comprising 93,000 words. The paper first describes the…

  12. Operational characteristics of VEC vacuum system

    International Nuclear Information System (INIS)

    Viswanadham, C.; Bhavsar, S.T.; Bose, D.K.; Chintalapudi, S.N.; Das, S.K.; Tiwary, S.D.

    1979-01-01

    The main vacuum system of the Variable Energy Cyclotron which has been built indigenously has fulfilled the requirements for the smooth operation of the machine. By running two 88.9 cm diffusion pumps with freon cooled baffles and backed by 600 l/m rotary pumps, a pressure of 5 x 10 -6 torr in absence of the beam and 1 x 10 -5 torr in presence of the beam is readily achieved in the 23 m 3 volume. Various means have been adopted to maintain the system in order and contamination-free, by maintaining a pressure level of 1 x 10 -4 torr throughout the working week by a 30 cm diffusion pump, which can run even on emergency power. Cryopanels have also been installed and tried out. Details of pump-down characteristics and system performance are discussed. (auth.)

  13. Robot operating system (ROS) the complete reference

    CERN Document Server

    The objective of this book is to provide the reader with a comprehensive coverage on the Robot Operating Systems (ROS) and latest related systems, which is currently considered as the main development framework for robotics applications. The book includes twenty-seven chapters organized into eight parts. Part 1 presents the basics and foundations of ROS. In Part 2, four chapters deal with navigation, motion and planning. Part 3 provides four examples of service and experimental robots. Part 4 deals with real-world deployment of applications. Part 5 presents signal-processing tools for perception and sensing. Part 6 provides software engineering methodologies to design complex software with ROS. Simulations frameworks are presented in Part 7. Finally, Part 8 presents advanced tools and frameworks for ROS including multi-master extension, network introspection, controllers and cognitive systems. This book will be a valuable companion for ROS users and developers to learn more ROS capabilities and features.   ...

  14. Implementation of NASTRAN on the IBM/370 CMS operating system

    Science.gov (United States)

    Britten, S. S.; Schumacker, B.

    1980-01-01

    The NASA Structural Analysis (NASTRAN) computer program is operational on the IBM 360/370 series computers. While execution of NASTRAN has been described and implemented under the virtual storage operating systems of the IBM 370 models, the IBM 370/168 computer can also operate in a time-sharing mode under the virtual machine operating system using the Conversational Monitor System (CMS) subset. The changes required to make NASTRAN operational under the CMS operating system are described.

  15. [Testing results of telemechanic system controlling train operators wakefulness].

    Science.gov (United States)

    Serikov, V V; Zakrevskaia, A A; Zakharchenko, D V; Alpaev, D V; At'kova, E O

    2015-01-01

    Expert and instrumental assessment covered efficiency of telemechanic system controlling train operators wakefulness in simulation of real night travel, through special simulator complex "Locomotive operator cabin". The telemechanic system controlling train operators wakefulness, if exploited correctly, provides wakefulness of the train operators at the level sufficient for the effective work. That is supported by distribution of falling asleep cases in experiments with activated or deactivated telemechanic system controlling train operators wakefulness. The study proved efficiency of telemechanic system controlling train operators wakefulness.

  16. NASA Space Launch System Operations Outlook

    Science.gov (United States)

    Hefner, William Keith; Matisak, Brian P.; McElyea, Mark; Kunz, Jennifer; Weber, Philip; Cummings, Nicholas; Parsons, Jeremy

    2014-01-01

    The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is working with the Ground Systems Development and Operations (GSDO) Program, based at the Kennedy Space Center (KSC), to deliver a new safe, affordable, and sustainable capability for human and scientific exploration beyond Earth's orbit (BEO). Larger than the Saturn V Moon rocket, SLS will provide 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130-t configuration. The primary mission of the SLS rocket will be to launch astronauts to deep space destinations in the Orion Multi- Purpose Crew Vehicle (MPCV), also in development and managed by the Johnson Space Center. Several high-priority science missions also may benefit from the increased payload volume and reduced trip times offered by this powerful, versatile rocket. Reducing the lifecycle costs for NASA's space transportation flagship will maximize the exploration and scientific discovery returned from the taxpayer's investment. To that end, decisions made during development of SLS and associated systems will impact the nation's space exploration capabilities for decades. This paper will provide an update to the operations strategy presented at SpaceOps 2012. It will focus on: 1) Preparations to streamline the processing flow and infrastructure needed to produce and launch the world's largest rocket (i.e., through incorporation and modification of proven, heritage systems into the vehicle and ground systems); 2) Implementation of a lean approach to reach-back support of hardware manufacturing, green-run testing, and launch site processing and activities; and 3) Partnering between the vehicle design and operations communities on state-of-the-art predictive operations analysis techniques. An example of innovation is testing the integrated vehicle at the processing facility in parallel, rather than

  17. Operational experience review and methods to enhance safety and reliability in the NPP-Leibstadt (KKL)

    International Nuclear Information System (INIS)

    Haeusermann, R.

    1997-01-01

    In the nuclear community it became clear that an integrated feedback system of operating experience must also include the unsuccessful results. The deviations, expected to achieved performance are analysed to the failure mode and its effect. KKL has lowered the number of safety significant events since commercial operation started. The thoroughness of the review/analysis of the events has increased with high priority set to human factor induced events in operation and maintenance. Since the participation of the author in the ASSET-Mission in Smolensk in 1993, KKL introduced the ASSET-Root-Cause method and has supplemented it by the HPES (Human Performance Enhancement System). 4 refs, 6 figs

  18. New Operator Assistance Features in the CMS Run Control System

    Energy Technology Data Exchange (ETDEWEB)

    Andre, J.M.; et al.

    2017-11-22

    During Run-1 of the LHC, many operational procedures have been automated in the run control system of the Compact Muon Solenoid (CMS) experiment. When detector high voltages are ramped up or down or upon certain beam mode changes of the LHC, the DAQ system is automatically partially reconfigured with new parameters. Certain types of errors such as errors caused by single-event upsets may trigger an automatic recovery procedure. Furthermore, the top-level control node continuously performs cross-checks to detect sub-system actions becoming necessary because of changes in configuration keys, changes in the set of included front-end drivers or because of potential clock instabilities. The operator is guided to perform the necessary actions through graphical indicators displayed next to the relevant command buttons in the user interface. Through these indicators, consistent configuration of CMS is ensured. However, manually following the indicators can still be inefficient at times. A new assistant to the operator has therefore been developed that can automatically perform all the necessary actions in a streamlined order. If additional problems arise, the new assistant tries to automatically recover from these. With the new assistant, a run can be started from any state of the sub-systems with a single click. An ongoing run may be recovered with a single click, once the appropriate recovery action has been selected. We review the automation features of CMS Run Control and discuss the new assistant in detail including first operational experience.

  19. C-Division annual review and operating plan, August 1990

    Energy Technology Data Exchange (ETDEWEB)

    Morse, N.R.

    1990-11-01

    The Computing and Communications Division is responsible for the Laboratory's Integrated Computing Network as well as Laboratory-wide communications. Our computing network, used by 8000 people distributed throughout the nation, constitutes one of the most powerful scientific computing facilities in the world. The purpose of this publication is to inform our clients of our strategic and operating plans. We review major accomplishments since early 1989 and describe our strategic planning goals and specific projects that will guide our operations over the next couple of years. Our mission statement, planning considerations, and management policies and practices are also included.

  20. Evolution of Linux operating system network

    Science.gov (United States)

    Xiao, Guanping; Zheng, Zheng; Wang, Haoqin

    2017-01-01

    Linux operating system (LOS) is a sophisticated man-made system and one of the most ubiquitous operating systems. However, there is little research on the structure and functionality evolution of LOS from the prospective of networks. In this paper, we investigate the evolution of the LOS network. 62 major releases of LOS ranging from versions 1.0 to 4.1 are modeled as directed networks in which functions are denoted by nodes and function calls are denoted by edges. It is found that the size of the LOS network grows almost linearly, while clustering coefficient monotonically decays. The degree distributions are almost the same: the out-degree follows an exponential distribution while both in-degree and undirected degree follow power-law distributions. We further explore the functionality evolution of the LOS network. It is observed that the evolution of functional modules is shown as a sequence of seven events (changes) succeeding each other, including continuing, growth, contraction, birth, splitting, death and merging events. By means of a statistical analysis of these events in the top 4 largest components (i.e., arch, drivers, fs and net), it is shown that continuing, growth and contraction events occupy more than 95% events. Our work exemplifies a better understanding and describing of the dynamics of LOS evolution.

  1. INTEGRATED OPERATIONAL DOSIMETRY SYSTEM AT CERN.

    Science.gov (United States)

    Dumont, Gérald; Pedrosa, Fernando Baltasar Dos Santos; Carbonez, Pierre; Forkel-Wirth, Doris; Ninin, Pierre; Fuentes, Eloy Reguero; Roesler, Stefan; Vollaire, Joachim

    2017-04-01

    CERN, the European Organization for Nuclear Research, upgraded its operational dosimetry system in March 2013 to be prepared for the first Long Shutdown of CERN's facilities. The new system allows the immediate and automatic checking and recording of the dosimetry data before and after interventions in radiation areas. To facilitate the analysis of the data in context of CERN's approach to As Low As Reasonably Achievable (ALARA), this new system is interfaced to the Intervention Management Planning and Coordination Tool (IMPACT). IMPACT is a web-based application widely used in all CERN's accelerators and their associated technical infrastructures for the planning, the coordination and the approval of interventions (work permit principle). The coupling of the operational dosimetry database with the IMPACT repository allows a direct and almost immediate comparison of the actual dose with the estimations, in addition to enabling the configuration of alarm levels in the dosemeter in function of the intervention to be performed. © The Author 2016. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  2. JPL Space Telecommunications Radio System Operating Environment

    Science.gov (United States)

    Lux, James P.; Lang, Minh; Peters, Kenneth J.; Taylor, Gregory H.; Duncan, Courtney B.; Orozco, David S.; Stern, Ryan A.; Ahten, Earl R.; Girard, Mike

    2013-01-01

    A flight-qualified implementation of a Software Defined Radio (SDR) Operating Environment for the JPL-SDR built for the CoNNeCT Project has been developed. It is compliant with the NASA Space Telecommunications Radio System (STRS) Architecture Standard, and provides the software infrastructure for STRS compliant waveform applications. This software provides a standards-compliant abstracted view of the JPL-SDR hardware platform. It uses industry standard POSIX interfaces for most functions, as well as exposing the STRS API (Application Programming In terface) required by the standard. This software includes a standardized interface for IP components instantiated within a Xilinx FPGA (Field Programmable Gate Array). The software provides a standardized abstracted interface to platform resources such as data converters, file system, etc., which can be used by STRS standards conformant waveform applications. It provides a generic SDR operating environment with a much smaller resource footprint than similar products such as SCA (Software Communications Architecture) compliant implementations, or the DoD Joint Tactical Radio Systems (JTRS).

  3. Importance of safety review to the safe operation of a nuclear plant

    International Nuclear Information System (INIS)

    Brinkerhoff, L.C.

    1978-01-01

    Widely differing standards of construction of nuclear reactors are employed in different countries. Although the reactor vendors, including designers and construction contractors, have a vested interest in safety, the ultimate responsibility for safety rests with the reactor facility operator. Even though governmental agencies, either directly or indirectly, must take a strong lead in developing policies and practices of safe operation, the reactor facility operator must recognize and accept the full responsibility for safe operation of the facility. The policies and practices of safe operation imposed by governmental agencies must help assure the prudent operation and the adequate maintenance of those structures, systems, and components of importance to safety. Since each country has a slightly different philosophy for achieving safety and each vendor utilizes different structures, systems, and components to fulfil this philosophy, it is imperative that the facility operator adequately maintain those engineered safety features and those plant protective systems which have been engineered into achieving the desired levels of safety. An additional method of helping to assure that those structures, systems, and components of importance to safety are prudently operated and adequately maintained is to assign the full safety responsibility for the overall operations of the reactor facility to the operating organization, i.e. assigning a 'line of responsibility' within the reactor facility operator. This assurance can be further strengthened by requiring that the facility operator establish a safety review body that overviews the operation and assures that the operating organization complies with those policies and practices of safe operation which have been imposed on the reactor facility. (author)

  4. Operating systems in the air transportation environment.

    Science.gov (United States)

    Cherry, G. W.

    1971-01-01

    Consideration of the problems facing air transport at present, and to be expected in the future. In the Northeast Corridor these problems involve community acceptance, airway and airport congestion and delays, passenger acceptance, noise reduction, and improvements in low-density short-haul economics. In the development of a superior short-haul operating system, terminal-configured vs cruise-configured vehicles are evaluated. CTOL, STOL, and VTOL aircraft of various types are discussed. In the field of noise abatement, it is shown that flight procedural techniques are capable of supplementing ?quiet engine' technology.

  5. Operation of the NSTX Thomson Scattering System

    International Nuclear Information System (INIS)

    LeBlanc, B.P.; Bell, R.E.; Johnson, D.W.; Hoffman, D.E.; Long, D.C.; Palladino, R.W.

    2002-01-01

    The NSTX multi-point Thomson scattering system has been in operation for nearly two years and provides routine Te(R,t) and ne(R,t) measurements. The laser beams from two 30-Hz Nd:YAG lasers are imaged by a spherical mirror onto 36 fiber-optics bundles. In the present configuration, the output ends of 20 of these bundles are instrumented with filter polychromators and avalanche photodiode detectors. In this paper, we discuss the laser implementation and the installed collection optics. We follow with examples of raw and analyzed data. We close with some comments about calibration

  6. Military Influence Operations: Review of the Consumer Psychology Literature

    Science.gov (United States)

    2008-11-01

    une documentation plus accessible que la littérature didactique et scientifique courante. Dans le présent chapitre, les auteurs abordent la question...and Learning Section Approved for release by K.C. Wulterkens for Chair, Document Review and Library Committee The scientific or...REINE EN DROIT DU CANADA (2008) Défense Nationale Canada Humansystems® Incorporated Influence Operations II Page i Abstract Following-up on a

  7. Operating-procedure system at Savannah River Plant

    International Nuclear Information System (INIS)

    Tope, C.W.

    1981-05-01

    Three types of procedures are widely used at SRP: Du Pont Savannah Operating Logsheet, Du Pont Savannah Operating Procedure, and Plant Manual. This document briefly reviews originating of the procedures, their preparation, control, and indexing

  8. Parametric Optimization of Some Critical Operating System Functions--An Alternative Approach to the Study of Operating Systems Design

    Science.gov (United States)

    Sobh, Tarek M.; Tibrewal, Abhilasha

    2006-01-01

    Operating systems theory primarily concentrates on the optimal use of computing resources. This paper presents an alternative approach to teaching and studying operating systems design and concepts by way of parametrically optimizing critical operating system functions. Detailed examples of two critical operating systems functions using the…

  9. Operation of the tevatron extraction system

    International Nuclear Information System (INIS)

    Finley, D.A.; Harrison, M.; Merz, W.; Pfeffer, H.

    1985-01-01

    The Fermilab Tevatron is currently in the middle of its second running period for fixed target physics. Steady operation has been established at 800 GeV with l X 10 13 protons being extracted. Beam spill over the 20 - 23 second flattop is regulated by a closed loop feedback and a feed forward learning system controlled by a microprocessor. Eight power supplies have their waveforms programmed by the microprocessor in an attempt to reduce the modulation on the beam spill. In addition the microprocessor can insert a pause in the slow spill and cause the extraction of a high intensity (3 X 10 12 ) fast (1-2 milliseconds long) pulse. A description of the extraction system as well as analysis of the spill modulation encountered during commissioning are presented in this paper. Current status of the spill structure is also discussed

  10. SNAP Operating System (SOS) user's guide

    International Nuclear Information System (INIS)

    Sabuda, J.D.; Polito, J.; Walker, J.L.; Grant, F.H. III.

    1982-03-01

    The SNAP Operating System (SOS) is a FORTRAN 77 program which provides assistance to the safeguards analyst who uses the Safeguards Automated Facility Evaluation (SAFE) and the Safeguards Network Analysis Procedure (SNAP) techniques. Features offered by SOS are a data base system for storing a library of SNAP applications, computer graphics representation of SNAP models, a computer graphics editor to develop and modify SNAP models, a SAFE-to-SNAP interface, automatic generation of SNAP input data, and a computer graphics postprocessor for SNAP. The SOS User's Guide is designed to provide the user with the information necessary to use SOS effectively. Examples are used throughout to illustrate the concepts. The format of the user's guide follows the same sequence as would be used in executing an actual application

  11. A review of aircraft turnaround operations and simulations

    Science.gov (United States)

    Schmidt, Michael

    2017-07-01

    The ground operational processes are the connecting element between aircraft en-route operations and airport infrastructure. An efficient aircraft turnaround is an essential component of airline success, especially for regional and short-haul operations. It is imperative that advancements in ground operations, specifically process reliability and passenger comfort, are developed while dealing with increasing passenger traffic in the next years. This paper provides an introduction to aircraft ground operations focusing on the aircraft turnaround and passenger processes. Furthermore, key challenges for current aircraft operators, such as airport capacity constraints, schedule disruptions and the increasing cost pressure, are highlighted. A review of the conducted studies and conceptual work in this field shows pathways for potential process improvements. Promising approaches attempt to reduce apron traffic and parallelize passenger processes and taxiing. The application of boarding strategies and novel cabin layouts focusing on aisle, door and seat, are options to shorten the boarding process inside the cabin. A summary of existing modeling and simulation frameworks give an insight into state-of-the-art assessment capabilities as it concerns advanced concepts. They are the prerequisite to allow a holistic assessment during the early stages of the preliminary aircraft design process and to identify benefits and drawbacks for all involved stakeholders.

  12. Pre-operative counselling for laryngectomy patients: a systematic review.

    Science.gov (United States)

    Fitzgerald, E; Perry, A

    2016-01-01

    This study aimed to undertake a systematic review of the literature about pre-operative counselling for laryngectomy patients, identify its practice and patient and (where possible) carer perceptions. A search strategy was formulated using a concept map and a Population, Intervention, Comparative Interaction and Outcomes ('PICO') schema. All publications from 1975 to 2015 reporting pre-operative counselling of laryngectomy patients were included. Papers were retrieved and critiqued, and those included were assigned a level of evidence (according to the Joanna Briggs Institute schema). Of the 56 papers retrieved, 21 were included in the review. The literature is limited: studies demonstrate bias and are of poor methodological quality. There are clear, persistent reports by patients and carers of shortfalls in clinical practice. Studies on pre-operative counselling for laryngectomees are flawed in design and represent weak levels of evidence. Pre-operative counselling has not been operationalised, resulting in differing paradigms being examined. Aggregation of data and/or results is not possible and the veracity of many studies is questioned.

  13. Review and updates of the risk assessment for advanced test reactor operations for operating events and experience

    International Nuclear Information System (INIS)

    Atkinson, S.A.

    1996-01-01

    Annual or biannual reviews of the operating history of the Advanced Test Reactor (ATR) at the Idaho National Engineering Laboratory (INEL) have been conducted for the purpose of reviewing and updating the ATR probabilistic safety assessment (PSA) for operating events and operating experience since the first compilation of plant- specific experience data for the ATR PSA which included data for operation from initial power operation in 1969 through 1988. This technical paper briefly discusses the means and some results of these periodic reviews of operating experience and their influence on the ATR PSA

  14. Transactive control: a framework for operating power systems characterized by high penetration of distributed energy resources

    DEFF Research Database (Denmark)

    Hu, Junjie; Yang, Guangya; Kok, Koen

    2016-01-01

    The increasing number of distributed energy resources connected to power systems raises operational challenges for the network operator, such as introducing grid congestion and voltage deviations in the distribution network level, as well as increasing balancing needs at the whole system level......, followed by a literature review and demonstration projects that apply to transactive control. Cases are then presented to illustrate the transactive control framework. At the end, discussions and research directions are presented, for applying transactive control to operating power systems, characterized...

  15. Smart Shipboard Power System Operation and Management

    Directory of Open Access Journals (Sweden)

    Fotis D. Kanellos

    2016-11-01

    Full Text Available During recent years, optimal electrification of isolated offshore systems has become increasingly important and received extensive attention from the maritime industry. Especially with the introduction of electric propulsion, which has led to a total electrification of shipboard power systems known as all-electric ships (AESs, the need for more cost-effective and emission-aware solutions is augmented. Such onboard systems are prone to sudden load variations due to the changing weather conditions as well as mission profile, thus they require effective power management systems (PMSs to operate optimally under different working conditions. In this paper, coordinated optimal power management at the supply/demand side of a given AES is studied with regard to different objectives and related technical/environmental constraints. The optimal power management problem is formulated as a mixed-integer nonlinear programming (MINLP model and is solved using a metaheuristic algorithm. To show the effectiveness and applicability of the proposed PMS, several test scenarios are implemented and related simulation results are analyzed and compared to those from conventional methods.

  16. REAL TIME SYSTEM OPERATIONS 2006-2007

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H.; Parashar, Manu; Lewis, Nancy Jo

    2008-08-15

    The Real Time System Operations (RTSO) 2006-2007 project focused on two parallel technical tasks: (1) Real-Time Applications of Phasors for Monitoring, Alarming and Control; and (2) Real-Time Voltage Security Assessment (RTVSA) Prototype Tool. The overall goal of the phasor applications project was to accelerate adoption and foster greater use of new, more accurate, time-synchronized phasor measurements by conducting research and prototyping applications on California ISO's phasor platform - Real-Time Dynamics Monitoring System (RTDMS) -- that provide previously unavailable information on the dynamic stability of the grid. Feasibility assessment studies were conducted on potential application of this technology for small-signal stability monitoring, validating/improving existing stability nomograms, conducting frequency response analysis, and obtaining real-time sensitivity information on key metrics to assess grid stress. Based on study findings, prototype applications for real-time visualization and alarming, small-signal stability monitoring, measurement based sensitivity analysis and frequency response assessment were developed, factory- and field-tested at the California ISO and at BPA. The goal of the RTVSA project was to provide California ISO with a prototype voltage security assessment tool that runs in real time within California ISO?s new reliability and congestion management system. CERTS conducted a technical assessment of appropriate algorithms, developed a prototype incorporating state-of-art algorithms (such as the continuation power flow, direct method, boundary orbiting method, and hyperplanes) into a framework most suitable for an operations environment. Based on study findings, a functional specification was prepared, which the California ISO has since used to procure a production-quality tool that is now a part of a suite of advanced computational tools that is used by California ISO for reliability and congestion management.

  17. Launch Processing System operations with a future look to Operations Analyst (OPERA)

    Science.gov (United States)

    Heard, Astrid E.

    1987-01-01

    The Launch Processing System architecture and the ground support operations required to provide Shuttle System engineers with the capability to safely process and launch an Orbiter are described. The described ground operations are the culmination of eleven years of experience and redesign. Some of the 'lessons learned' are examined, and problem areas which ground support operations have identified over the years as the Shuttle and Launch Processing Systems continue to grow in complexity are discussed. The Operational Analyst for Distributed Systems (OPERA), a proposed set of expert systems for the Launch Processing System Operational assistance, is discussed along with its extensions to prospective future configurations and components for the Launch Processing System.

  18. The design of intelligent support systems for nuclear reactor operators

    International Nuclear Information System (INIS)

    Bernard, J.A.

    1992-01-01

    This paper identifies factors relevant to the design of intelligent support systems and their use for the provision of real-time diagnostic information. As such, it constitutes a followup to the state-of-the-art review that was previously published by Bernard and Washio on the utilization of expert systems within the nuclear industry. Some major differences between intelligent-support tools and conventional expert systems are enumerated. In summary, conventional expert systems that encode experimental knowledge in production rules are not suitable vehicle for the creation of operator support systems. The principal difficulty is the need for real-time operation. This in turn means that intelligent support systems will have knowledge bases derived from temporally accurate plant models, inference engines that permit revisions in the search process to accommodate revised data, and man-machine interfaces that do not require any human input. Such systems will be heavily instrumented, and the associated knowledge bases will require a hierarchical organization to emulate human approaches to analysis

  19. Timetable of an operational flood forecasting system

    Science.gov (United States)

    Liechti, Katharina; Jaun, Simon; Zappa, Massimiliano

    2010-05-01

    At present a new underground part of Zurich main station is under construction. For this purpose the runoff capacity of river Sihl, which is passing beneath the main station, is reduced by 40%. If a flood is to occur the construction site is evacuated and gates can be opened for full runoff capacity to prevent bigger damages. However, flooding the construction site, even if it is controlled, is coupled with costs and retardation. The evacuation of the construction site at Zurich main station takes about 2 to 4 hours and opening the gates takes another 1 to 2 hours each. In the upper part of the 336 km2 Sihl catchment the Sihl lake, a reservoir lake, is situated. It belongs and is used by the Swiss Railway Company for hydropower production. This lake can act as a retention basin for about 46% of the Sihl catchment. Lowering the lake level to gain retention capacity, and therewith safety, is coupled with direct loss for the Railway Company. To calculate the needed retention volume and the water to be released facing unfavourable weather conditions, forecasts with a minimum lead time of 2 to 3 days are needed. Since the catchment is rather small, this can only be realised by the use of meteorological forecast data. Thus the management of the construction site depends on accurate forecasts to base their decisions on. Therefore an operational hydrological ensemble prediction system (HEPS) was introduced in September 2008 by the Swiss Federal Institute for Forest, Snow and Landscape Research (WSL). It delivers daily discharge forecasts with a time horizon of 5 days. The meteorological forecasts are provided by MeteoSwiss and stem from the operational limited-area COSMO-LEPS which downscales the ECMWF ensemble prediction system to a spatial resolution of 7 km. Additional meteorological data for model calibration and initialisation (air temperature, precipitation, water vapour pressure, global radiation, wind speed and sunshine duration) and radar data are also provided by

  20. LHCb Conditions database operation assistance systems

    Science.gov (United States)

    Clemencic, M.; Shapoval, I.; Cattaneo, M.; Degaudenzi, H.; Santinelli, R.

    2012-12-01

    The Conditions Database (CondDB) of the LHCb experiment provides versioned, time dependent geometry and conditions data for all LHCb data processing applications (simulation, high level trigger (HLT), reconstruction, analysis) in a heterogeneous computing environment ranging from user laptops to the HLT farm and the Grid. These different use cases impose front-end support for multiple database technologies (Oracle and SQLite are used). Sophisticated distribution tools are required to ensure timely and robust delivery of updates to all environments. The content of the database has to be managed to ensure that updates are internally consistent and externally compatible with multiple versions of the physics application software. In this paper we describe three systems that we have developed to address these issues. The first system is a CondDB state tracking extension to the Oracle 3D Streams replication technology, to trap cases when the CondDB replication was corrupted. Second, an automated distribution system for the SQLite-based CondDB, providing also smart backup and checkout mechanisms for the CondDB managers and LHCb users respectively. And, finally, a system to verify and monitor the internal (CondDB self-consistency) and external (LHCb physics software vs. CondDB) compatibility. The former two systems are used in production in the LHCb experiment and have achieved the desired goal of higher flexibility and robustness for the management and operation of the CondDB. The latter one has been fully designed and is passing currently to the implementation stage.

  1. Accessibility od design documentation on mobile devices with Android Operating System

    OpenAIRE

    Lovše, Tilen

    2013-01-01

    In this graduation thesis the accessibility of design documentation on mobile devices with Android operating system is discussed. Mobile devices, used for accessing to design documentation, are tablet computers or simply tablets. Introduction presents benefits of accessing to design documentation on tablets and Slovenian history in this field, followed by the review of Android operating system, its history, upgrade and features. Practical part covers the review of five different tablets, whic...

  2. Operating system design the Xinu approach, Linksys version

    CERN Document Server

    Press, CRC

    2011-01-01

    Introduction and OverviewOperating SystemsApproach Used In The TextA Hierarchical DesignThe Xinu Operating SystemWhat An Operating System Is NotAn Operating System Viewed From The OutsideRemainder Of The TextConcurrent Execution And Operating System ServicesProgramming Models For Multiple ActivitiesOperating System ServicesConcurrent Processing Concepts And TerminologyDistinction Between Sequential And Concurrent ProgramsMultiple Processes Sharing A Single Piece Of CodeProcess Exit And Process TerminationShared Memory, Race Conditions, And SynchronizationSemaphores And Mutual ExclusionType Nam

  3. The armenian power system operation stability investigation accounting putting new power systems into operation

    International Nuclear Information System (INIS)

    Yeghiazaryan, L.V.; Hakobyan, S.G.; Gharibyan, G.V.; Harutyunyan, G.S.; Galstyan, G.H.

    2010-01-01

    The description of the power systems operation stability failure caused by the system significant emergency states occurred during the last working period in Armenian and USA power systems is performed. With the use of PSSTME-31 software portfolio of Siemens Firm a design model is developed and transient electromechanical process calculations for Armenian power system are performed. The accuracy of the model is checked by comparing real-time transient state parameters and their reproduction calculation results.The Armenia - Iran current power transmission lines permissible limit under the condition of the static and dynamic stability requirements and in case of the new thermal power units maintenance are defined

  4. A prototype expert system for advising operational procedures

    International Nuclear Information System (INIS)

    Ohi, T.; Saiki, A.; Terashita, N.; Sasaki, K.

    1990-01-01

    Development of an operator support system has come to be an important subject for Nuclear Power Plants. An expert system for advising operational procedures for nuclear power plants was developed to provide operators with adequate operation plans. The system consists of two parts. One is the operation interpretation module that uses the knowledge base of operational procudures represented in the form of an extended Petri net model. The other is the operation consultation module that uses a hierarchical qualitative model of a nuclear power plant. The structure of each knowledge base and the method of inference to generate adequate operations plan were investigated. The availability of our concept has been confirmed by the protorype system for CVCS (Chemical and Volume Control System) of PWR. This concept can be applied to the operator support system to supply operation guidance under anomalous plant conditions

  5. Multiple operating system rotation environment moving target defense

    Science.gov (United States)

    Evans, Nathaniel; Thompson, Michael

    2016-03-22

    Systems and methods for providing a multiple operating system rotation environment ("MORE") moving target defense ("MTD") computing system are described. The MORE-MTD system provides enhanced computer system security through a rotation of multiple operating systems. The MORE-MTD system increases attacker uncertainty, increases the cost of attacking the system, reduces the likelihood of an attacker locating a vulnerability, and reduces the exposure time of any located vulnerability. The MORE-MTD environment is effectuated by rotation of the operating systems at a given interval. The rotating operating systems create a consistently changing attack surface for remote attackers.

  6. Portable Operating Systems for Network Computers: Distributed Operating Systems Support for Group Communications.

    Science.gov (United States)

    1985-10-31

    Modula-2 MICROS/ MICRONET " (5) William S. Holmes, May 1983, "Version and Source Code Support Environment" (6) Michael J. Palumbo. May 1983, "Stand...Dist. Comp. Sys., Denver, CO, May 1985, 386- 393. 7. A. van Tilborg and L. D. Wittie, "Operating Systems for the Micronet Network Computer", IEEE Micro

  7. Short-Term Wind Speed Forecasting for Power System Operations

    KAUST Repository

    Zhu, Xinxin

    2012-04-01

    The emphasis on renewable energy and concerns about the environment have led to large-scale wind energy penetration worldwide. However, there are also significant challenges associated with the use of wind energy due to the intermittent and unstable nature of wind. High-quality short-term wind speed forecasting is critical to reliable and secure power system operations. This article begins with an overview of the current status of worldwide wind power developments and future trends. It then reviews some statistical short-term wind speed forecasting models, including traditional time series approaches and more advanced space-time statistical models. It also discusses the evaluation of forecast accuracy, in particular, the need for realistic loss functions. New challenges in wind speed forecasting regarding ramp events and offshore wind farms are also presented. © 2012 The Authors. International Statistical Review © 2012 International Statistical Institute.

  8. Phenix reactor: a review of 35 year long operating life

    International Nuclear Information System (INIS)

    Martin, L.; Dall'Ava, D.; Rochwerger, D.; Goux, D.; Guidez, J.; Martin, Ph.; Seran, J.L.; Sauvage, J.F.; Prele, G.; Guihard, J.; Bernardin, B.; Vanier, M.; Zaetta, A.; Latge, Ch.; Fontaine, B.; Jolly, J.A.; Gros, J.; Pepe, D.; Pelletier, M.; Pillon, S.; Escaravage, C.; Gelineau, O.; Dupraz, R.; Dirat, J.F.; Giraud, M.; Michaille, P.

    2009-01-01

    Phenix reactor that was commissioned in 1973, had its final shutdown during the beginning of 2009. This series of articles presents the main contributions of Phenix over its 35 years of operating life in material sciences, the handling of sodium, the design of fast reactors, core physics and reactor safety. Other articles recall the feedback experience on particular components like sodium pumps, steam generators or intermediate heat exchangers and about reactor maintenance. This power plant was first an experimental reactor that, with its hot cells, has performed important irradiation programs concerning mainly fast reactor technology and transmutation as a tool for burning actinides. One article reviews the environmental impact of this reactor over its operating life in terms of waste production and dosimetry. (A.C.)

  9. Operator interface design considerations for a PACS information management system

    Science.gov (United States)

    Steinke, James E.; Nabijee, Kamal H.; Freeman, Rick H.; Prior, Fred W.

    1990-08-01

    As prototype PACS grow into fully digital departmental and hospital-wide systems, effective information storage and retrieval mechanisms become increasingly important. Thus far, designers of PACS workstations have concentrated on image communication and display functionality. The new challenge is to provide appropriate operator interface environments to facilitate information retrieval. The "Marburg Model" 1 provides a detailed analysis of the functions, control flows and data structures used in Radiology. It identifies a set of "actors" who perform information manipulation functions. Drawing on this model and its associated methodology it is possible to identify four modes of use of information systems in Radiology: Clinical Routine, Research, Consultation, and Administration. Each mode has its own specific access requirements and views of information. An operator interface strategy appropriate for each mode will be proposed. Clinical Routine mode is the principal concern of PACS primary diagnosis workstations. In a full PACS implementation, such workstations must provide a simple and consistent navigational aid for the on-line image database, a local work list of cases to be reviewed, and easy access to information from other hospital information systems. A hierarchical method of information access is preferred because it provides the ability to start at high-level entities and iteratively narrow the scope of information from which to select subsequent operations. An implementation using hierarchical, nested software windows which fulfills such requirements shall be examined.

  10. Improving striping operations through system optimization.

    Science.gov (United States)

    2015-09-01

    Striping operations generate a significant workload for Missouri Department of Transportation (MoDOT) maintenance : operations. The requirement for each striping crew to replenish its stock of paint and other consumable items from a bulk storage : fa...

  11. The chirality operators for Heisenberg spin systems

    International Nuclear Information System (INIS)

    Subrahmanyam, V.

    1994-01-01

    The ground state of closed Heisenberg spin chains with an odd number of sites has a chiral degeneracy, in addition to a two-fold Kramers degeneracy. A non-zero chirality implies that the spins are not coplanar, and is a measure of handedness. The chirality operator, which can be treated as a spin-1/2 operator, is explicitly constructed in terms of the spin operators, and is given as commutator of permutation operators. (author). 3 refs

  12. X-37 Storable Propulsion System Design and Operations

    Science.gov (United States)

    Rodriguez, Henry; Popp, Chris; Rehegan, Ronald J.

    2006-01-01

    In a response to NASA's X-37 TA-10 Cycle-1 contract, Boeing assessed nitrogen tetroxide (N2O4) and monomethyl hydrazine (MMH) Storable Propellant Propulsion Systems to select a low risk X-37 propulsion development approach. Space Shuttle lessons learned, planetary spacecraft, and Boeing Satellite HS-601 systems were reviewed to arrive at a low risk and reliable storable propulsion system. This paper describes the requirements, trade studies, design solutions, flight and ground operational issues which drove X-37 toward the selection of a storable propulsion system. The design of storable propulsion systems offers the leveraging of hardware experience that can accelerate progress toward critical design. It also involves the experience gained from launching systems using MMH and N2O4 propellants. Leveraging of previously flight-qualified hardware may offer economic benefits and may reduce risk in cost and schedule. This paper summarizes recommendations based on experience gained from Space Shuttle and similar propulsion systems utilizing MMH and N2O4 propellants. System design insights gained from flying storable propulsion are presented and addressed in the context of the design approach of the X-37 propulsion system.

  13. How to guide - transit operations decision support systems (TODSS).

    Science.gov (United States)

    2014-12-01

    Transit Operations Decision Support Systems (TODSS) are decision support systems designed to support dispatchers in real-time bus operations : management in response to incidents, special events, and other changing conditions in order to restore serv...

  14. Thermoplastic high performance cable insulation systems for flexible system operation

    OpenAIRE

    Vaughan, A.S.; Green, C.D.; Hosier, I.L.; Stevens, G.C.; Pye, A.; Thomas, J.L.; Sutton, S.J.; Guessens, T.

    2015-01-01

    Crosslinked polyethylene (XLPE) has been the cable insulation material of choice in many different transmission and distribution applications for many years and, while this material has many desirable characteristics, its thermo-mechanical properties have consequences for both continuous and emergency cable ratings which, in turn, have implications for system operational flexibility. In this paper, we describe the principles and two embodiments through which new thermoplastic insulation syste...

  15. Mined Geologic Disposal System Concept of Operations

    International Nuclear Information System (INIS)

    Heidt, R.M.

    1995-01-01

    A Concept of Operations has been developed for the disposal of high-level radioactive waste in the potential geologic repository at Yucca Mountain. The Concept of Operations has been developed to document a cormion understanding of how the repository is to be operated. It is based on the repository architecture identified in the Initial Summary Report for Repository/Waste Package Advanced Conceptual Design and describes the operation of the repository from the initial receipt of waste through repository closure. Also described are operations for waste retrieval

  16. Operating The Central Process Systems At Glenn Research Center

    Science.gov (United States)

    Weiler, Carly P.

    2004-01-01

    As a research facility, the Glenn Research Center (GRC) trusts and expects all the systems, controlling their facilities to run properly and efficiently in order for their research and operations to occur proficiently and on time. While there are many systems necessary for the operations at GRC, one of those most vital systems is the Central Process Systems (CPS). The CPS controls operations used by GRC's wind tunnels, propulsion systems lab, engine components research lab, and compressor, turbine and combustor test cells. Used widely throughout the lab, it operates equipment such as exhausters, chillers, cooling towers, compressors, dehydrators, and other such equipment. Through parameters such as pressure, temperature, speed, flow, etc., it performs its primary operations on the major systems of Electrical Dispatch (ED), Central Air Dispatch (CAD), Central Air Equipment Building (CAEB), and Engine Research Building (ERB). In order for the CPS to continue its operations at Glenn, a new contract must be awarded. Consequently, one of my primary responsibilities was assisting the Source Evaluation Board (SEB) with the process of awarding the recertification contract of the CPS. The job of the SEB was to evaluate the proposals of the contract bidders and then to present their findings to the Source Selecting Official (SSO). Before the evaluations began, the Center Director established the level of the competition. For this contract, the competition was limited to those companies classified as a small, disadvantaged business. After an industry briefing that explained to qualified companies the CPS and type of work required, each of the interested companies then submitted proposals addressing three components: Mission Suitability, Cost, and Past Performance. These proposals were based off the Statement of Work (SOW) written by the SEB. After companies submitted their proposals, the SEB reviewed all three components and then presented their results to the SSO. While the

  17. Operator Support System Design forthe Operation of RSG-GAS Research Reactor

    Science.gov (United States)

    Santoso, S.; Situmorang, J.; Bakhri, S.; Subekti, M.; Sunaryo, G. R.

    2018-02-01

    The components of RSG-GAS main control room are facing the problem of material ageing and technology obsolescence as well, and therefore the need for modernization and refurbishment are essential. The modernization in control room can be applied on the operator support system which bears the function in providing information for assisting the operator in conducting diagnosis and actions. The research purpose is to design an operator support system for RSG-GAS control room. The design was developed based on the operator requirement in conducting task operation scenarios and the reactor operation characteristics. These scenarios include power operation, low power operation and shutdown/scram reactor. The operator support system design is presented in a single computer display which contains structure and support system elements e.g. operation procedure, status of safety related components and operational requirements, operation limit condition of parameters, alarm information, and prognosis function. The prototype was developed using LabView software and consisted of components structure and features of the operator support system. Information of each component in the operator support system need to be completed before it can be applied and integrated in the RSG-GAS main control room.

  18. An operating environment for control systems on transputer networks

    NARCIS (Netherlands)

    Tillema, H.G.; Schoute, Albert L.; Wijbrans, K.C.J.; Wijbrans, K.C.J.

    1991-01-01

    The article describes an operating environment for control systems. The environment contains the basic layers of a distributed operating system. The design of this operating environment is based on the requirements demanded by controllers which can be found in complex control systems. Due to the

  19. 36 CFR 1194.21 - Software applications and operating systems.

    Science.gov (United States)

    2010-07-01

    ... operating systems. 1194.21 Section 1194.21 Parks, Forests, and Public Property ARCHITECTURAL AND... Standards § 1194.21 Software applications and operating systems. (a) When software is designed to run on a... shall not disrupt or disable activated features of any operating system that are identified as...

  20. Proposed Reactor Operating Experience Feedback System Development

    International Nuclear Information System (INIS)

    Ahn, Seung Hoon; Kim, Min Chul; Huh, Chang Wook; Lee, Durk Hun; Bae, Koo Hyun

    2006-01-01

    Most events occurring in nuclear power plants are not individually significant, and prevented from progressing to accident conditions by a series of barriers against core damage and radioactive releases. Significant events, if occur, are almost always a breach of these multiple barriers. As illustrated in the 'Swiss cheese' model, the individual layers of defense or 'cheese slices' have weakness or 'holes.' These weaknesses are inconstant, i.e., the holes are open or close at random. When by chance all the holes are aligned, a hazard causes the significant event of concern. Elements of low significant events, inattention to detail, time or economic pressure, uncorrected poor practices/habits, marginal maintenance and equipment care, etc., make holes in the layers of defense; some elements may make more holes in different layers, incurring more chances to be aligned. An effective reduction of the holes, therefore, is gained through better knowledge or awareness of increasing trends of the event elements, followed by appropriate actions. According to the Swiss cheese metaphor, attention to the Operating Experience (OE) feedback system, as opposed to the individual and to randomness, is drawn from a viewpoint of reactor safety

  1. Review of human factors in operator aids development at ORNL

    International Nuclear Information System (INIS)

    Sides, W.H. Jr.

    1983-01-01

    Three related Oak Ridge National Laboratory (ORNL) projects in the area of human factors in diagnostic aids are described. The goal of the first, sponsored by the Electric Power Research Institute (EPRI RP2184), is to provide guidance to nuclear-utility engineers in the selection and retrofit of computer-generated display systems in nuclear-plant control rooms. The goal of the second, sponsored by the Office of Research of the Nuclear Regulatory Commission (NRC), is to provide the NRC with a preview of some of the operator aids currently under development by industry for the purpose of assessing the applicability of current requirements. The goal of the third, also sponsored by the NRC, is to develop a methodology to determine the proper allocation of function between an operator and an automated system. The status of each project is given, together with the current and expected findings

  2. Implementation plan for WRAP Module 1 operational readiness review

    International Nuclear Information System (INIS)

    Irons, L.G.

    1994-01-01

    The Waste Receiving and Processing Module 1 (WRAP 1) will be used to receive, sample, treat, and ship contact-handled (CH) transuranic (TRU), low-level waste (LLW), and low-level mixed waste (LLMW) to storage and disposal sites both on the Hanford site and off-site. The primary mission of WRAP 1 is to characterize and certify CH waste in 55-gallon and 85-gallon drums; and its secondary function is to certify CH waste standard waste boxes (SWB) and boxes of similar size for disposal. The WRAP 1 will provide the capability for examination (including x-ray, visual, and contents sampling), limited treatment, repackaging, and certification of CH suspect-TRU waste in 55-gallon drums retrieved from storage, as well as newly generated CH LLW and CH TRU waste drums. The WRAP 1 will also provide examination (X-ray and visual only) and certification of CH LLW and CH TRU waste in small boxes. The decision to perform an Operational Readiness Review (ORR) was made in accordance with WHC-CM-5-34, Solid Waste Disposal Operations Administration, Section 1.4, Operational Readiness Activities. The ORR will ensure plant and equipment readiness, management and personnel readiness, and management programs readiness for the initial startup of the facility. This implementation plan is provided for defining the conduct of the WHC ORR

  3. Expert system for operational personnel support during power unit operation control in regulation range

    International Nuclear Information System (INIS)

    Yanitskij, V.A.

    1992-01-01

    The problems met when developing the systems for NPP operator support in the process of power unit operation are considered. The expert system for NPP personnel intelligent support combining the properties belonging to the artificial intelligence systems including selection of the analysis method taking into account the concrete technological situation and capability of application of algothmic calculations of the equipment characteristics using the information accumulated during the system development, erection and operation is described

  4. Operation of the International Monitoring System Network

    Science.gov (United States)

    Araujo, Fernando; Castillo, Enrique; Nikolova, Svetlana; Daly, Timothy

    2010-05-01

    The IMS is a globally distributed network of monitoring facilities using sensors from four technologies. It is designed to detect the seismic and acoustic waves produced by nuclear test explosions and the subsequently released radioactive isotopes. Monitoring stations transmit their data to the IDC in Vienna, Austria, over a global private network known as the Global Communications Infrastructure (GCI). In order to satisfy the strict data and network availability requirements of the IMS Network, the operation of the facilities and the GCI are managed by IDC Operations. IDC Operations has three functions: the first is to ensure proper operation and functioning of the stations, the second to ensure proper operation and functioning of the GCI, and the third, handled by the IDC Operations Centre is to provide network oversight and incident management. At the core of the IMS Network operations are a series of tools for: monitoring the stations' state of health and data quality, troubleshooting incidents, communicating with internal and external stakeholders, and reporting. An overview of the tools currently used by IDC Operations as well as those under development will be presented. This will include an outline of the IDC's strategy for operations and its dependence on entities both inside and outside the CTBTO.

  5. Advanced Multimission Operations Systems Tech (AMMOS) Technology

    Data.gov (United States)

    National Aeronautics and Space Administration — AMMOS provides multi-mission operations, navigation, design, and training tools for Planetary Science flight missions, and undertakes technology investments for...

  6. A Human Factors Review of the Operational Error Literature

    Science.gov (United States)

    2006-08-01

    7655). McLean, VA: METREK Division of The MITRE Corporation. Kinney, G. C. (1986). Letter to Dr. Frank Austin discussing brief summaries of work done...at MITRE. Un- published manuscript. Kirchner , J. H. & Laurig, W. (1971). The human operator in air traffic control systems. Ergonomics, 4, 549-56...Philipp, U., Reiche, D., & Kirchner , J. H. (1971). The use of subjective rating. Ergonomics, 4, 611-6. Pounds, J. (1999). Pounds notes on REF ID

  7. An operating system for future aerospace vehicle computer systems

    Science.gov (United States)

    Foudriat, E. C.; Berman, W. J.; Will, R. W.; Bynum, W. L.

    1984-01-01

    The requirements for future aerospace vehicle computer operating systems are examined in this paper. The computer architecture is assumed to be distributed with a local area network connecting the nodes. Each node is assumed to provide a specific functionality. The network provides for communication so that the overall tasks of the vehicle are accomplished. The O/S structure is based upon the concept of objects. The mechanisms for integrating node unique objects with node common objects in order to implement both the autonomy and the cooperation between nodes is developed. The requirements for time critical performance and reliability and recovery are discussed. Time critical performance impacts all parts of the distributed operating system; e.g., its structure, the functional design of its objects, the language structure, etc. Throughout the paper the tradeoffs - concurrency, language structure, object recovery, binding, file structure, communication protocol, programmer freedom, etc. - are considered to arrive at a feasible, maximum performance design. Reliability of the network system is considered. A parallel multipath bus structure is proposed for the control of delivery time for time critical messages. The architecture also supports immediate recovery for the time critical message system after a communication failure.

  8. Chairside systems: a current review.

    Science.gov (United States)

    Zaruba, Markus; Mehl, Albert

    Since Cerec (Chairside Economical Restoration of Esthetic Ceramics) was introduced as the first dental chairside computer-aided design/computer-aided manufacturing (CAD/CAM) system in the mid-1980s, this technology has enjoyed growing popularity, particularly in the recent past. There has been a considerable increase in the number of available chairside systems in only the last few years. One of the main reasons for this is that intraoral scanners have become increasingly better, smaller, and faster, while the design software has become more and more user-friendly. Many work steps are now automated, and a very large range of materials is now available for dental chairside applications. These advances have driven the rapid increase in the range of indications for chairside dentistry in the areas of prosthodontics, dental implantology, and orthodontics, and have paved the way for more novel treatment and treatment planning strategies. Another reason is that intraoral scanner-based digital impression techniques are already superior to conventional impression techniques in certain respects. Moreover, the quality of fit of digitally designed dental restorations is constantly improving because of advances in milling machine technology. Due to the sheer number of new possibilities, it is only a matter of time before chairside systems become a standard component of dental practice. This article reviews the actual advantages and limitations of the chairside workflow, and provides a summary of all the available chairside systems available today.

  9. Systemic Operational Design: Bringing Efficacy to the Operational Level of War

    National Research Council Canada - National Science Library

    Bernard, Barrett M

    2007-01-01

    The premise of this monograph is that the Elements of Operational Design are incapable of linking the tactical employment of forces to strategic objectives and that Systemic Operational Design is a viable alternative...

  10. Instability of refrigeration system - A review

    International Nuclear Information System (INIS)

    Liang Nan; Shao Shuangquan; Xu Hongbo; Tian Changqing

    2010-01-01

    It is essential to ensure the stability for the normal operation of refrigeration systems. This paper reviews the researches on the theory and solutions of the instability of refrigeration systems. The instability of refrigeration systems includes two aspects: the two-phase flow instability in refrigeration system, the instability on refrigeration system control characteristics. As an inherent characteristic of two-phase evaporating flow, several separate explanations for the formation of oscillation of mixture-vapor transition point in the evaporation process by different scholars had been given but there is no general explanation till now. The investigation of instability on refrigeration system control characteristics focused on both static and dynamic researches. The minimum stable signal line theory, as a very important finding for the static instability of the evaporator and thermal expansion valve control loop, presented the different result to other researches. Dynamic researches on simulation and frequency-domain analysis provided various means for forecast and validation with considerable precision while their application range was still confined. With the development of variable capacity compressor and electronic expansion valve, further researches should be carried out to analyze the instability of the variable capacity refrigeration system with considering the influence of parameter coupling and control algorithm.

  11. Operating experience and procedures at the tritium systems test assembly

    International Nuclear Information System (INIS)

    Carlson, R.V.; Binning, K.E.; Cole, S.P.; Jenkins, E.M.; Wilhelm, R.C.; Cole, S.P.

    1988-01-01

    Operating procedures are important for the safe and efficient operation of the Tritium Systems Test Assembly (TSTA). TSTA has been operating for four years with tritium in a safe and efficient manner. The inventory of tritium in the process loop is 100 grams and several milestone runs have been completed. This paper describes the methods used to operate TSTA. 3 refs., 1 fig

  12. Design/Operations review of core sampling trucks and associated equipment

    International Nuclear Information System (INIS)

    Shrivastava, H.P.

    1996-01-01

    A systematic review of the design and operations of the core sampling trucks was commissioned by Characterization Equipment Engineering of the Westinghouse Hanford Company in October 1995. The review team reviewed the design documents, specifications, operating procedure, training manuals and safety analysis reports. The review process, findings and corrective actions are summarized in this supporting document

  13. Real-time operating system for a multi-laser/multi-detector system

    Science.gov (United States)

    Coles, G.

    1980-01-01

    The laser-one hazard detector system, used on the Rensselaer Mars rover, is reviewed briefly with respect to the hardware subsystems, the operation, and the results obtained. A multidetector scanning system was designed to improve on the original system. Interactive support software was designed and programmed to implement real time control of the rover or platform with the elevation scanning mast. The formats of both the raw data and the post-run data files were selected. In addition, the interface requirements were selected and some initial hardware-software testing was completed.

  14. Air operations language for military space ground systems

    Science.gov (United States)

    Davis, P.

    The trends in military space ground system architecture is toward large amounts of software and more widely distributed processors. At the same time, life cycle cost considerations dictate that fewer personnel with minimized skill levels and knowledge operate and support these systems. This squeeze necessitates more human engineering and operational planning into the design of these systems. Several techniques have been developed to satisfy these requirements. An operations language is one of these techniques. It involves a specially defined syntax for control of the system. Individual directives are able to be grouped into operations language procedures. These procedures can be prepared offline ahead of time by more skilled personnel and then used to ensure repeatability of operational sequences and reduce operator errors. The use of an operations language also provides benefits for the handling of contingency operations as well as in the system testing and validation programs.

  15. Development of operation support system for MOX fuel production line

    International Nuclear Information System (INIS)

    Gunji, Yasutoshi; Fujiwara, Shigeo; Iso, Hidetoshi; Suzuki, Yoshihiro; Shishido, Toshio

    1989-01-01

    Plutonium Fuel Production Facility (PFPF) FBR line started production of MOX fuels for 'JOYO' MK-II in October 1988. The production campaign for 'Monju' initial core fuel followed that for 'Joyo'. Control of this line is mainly computerized to allow remote operation. According to our test run experiences the automated plant, requires the higher judgement ability of operator when a problem arises. We need the plant which can be operated by even unskilled operator, on the technical level equal to that of skilled operator. This requirement will be satisfied by introduction of new support system into applying Artificial Intelligence technology based on operating experience. Now we have developed some operation support systems taking main aim at high efficiency of production for example, the optimum operation control system the failure diagnosis system and the production planning support system. (author)

  16. Solar heating and cooling systems: operational results

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    Forty-six papers are included. One paper was abstracted previously. Separate abstracts were prepared for each paper. Summary reviews of each session and the introductory remarks were not abstracted. (MHR)

  17. Quasi-Automatic Monitoring System For Turning Operation Using ...

    African Journals Online (AJOL)

    This work discusses the generation of a quasi monitoring system intended for an operator to change cutting tool during turning operation. The monitoring system uses the effects of turning va riables on acoustic emission signal responses and factorial experimental design approach. In cutting operations, acoustic emission ...

  18. On the operational aspects of subsea systems

    Digital Repository Service at National Institute of Oceanography (India)

    Nayak, M.R.

    The scientific and commercial underwater activities in the next decades primarily in 'undersea vehicles' and 'manned submersibles' will be taking place in the oceans and ocean related technology. The paper underlines some of the operational aspects...

  19. Developing a knowledge system for information operations

    CSIR Research Space (South Africa)

    Leenen, L

    2011-03-01

    Full Text Available and to defend one’s own interests. Corporations, governments, and military forces are facing increasing exposure to strategic information-based actions. Most national defence and security organisations regard Information Operations as both a defensive...

  20. Mission operations concepts for Earth Observing System (EOS)

    Science.gov (United States)

    Kelly, Angelita C.; Taylor, Thomas D.; Hawkins, Frederick J.

    1991-01-01

    Mission operation concepts are described which are being used to evaluate and influence space and ground system designs and architectures with the goal of achieving successful, efficient, and cost-effective Earth Observing System (EOS) operations. Emphasis is given to the general characteristics and concepts developed for the EOS Space Measurement System, which uses a new series of polar-orbiting observatories. Data rates are given for various instruments. Some of the operations concepts which require a total system view are also examined, including command operations, data processing, data accountability, data archival, prelaunch testing and readiness, launch, performance monitoring and assessment, contingency operations, flight software maintenance, and security.

  1. Development of operator thinking model and its application to nuclear reactor plant operation system

    International Nuclear Information System (INIS)

    Miki, Tetsushi; Endou, Akira; Himeno, Yoshiaki

    1992-01-01

    At first, this paper presents the developing method of an operator thinking model and the outline of the developed model. In next, it describes the nuclear reactor plant operation system which has been developed based on this model. Finally, it has been confirmed that the method described in this paper is very effective in order to construct expert systems which replace the reactor operator's role with AI (artificial intelligence) systems. (author)

  2. Review of Power Sharing Control Strategies for Islanding Operation of AC Microgrids

    DEFF Research Database (Denmark)

    Han, Hua; Hou, Xiaochao; Yang, Jian

    2016-01-01

    Microgrid is a new concept for future energy distribution system that enables renewable energy integration. It generally consists of multiple distributed generators (DGs) that are usually interfaced to the grid through power inverters. For the islanding operation of AC microgrids, two important...... tasks are to share the load demand among multiple parallel connected inverters proportionately and maintain the voltage and frequency stabilities. This paper reviews and categorizes various approaches of power sharing control principles. Simultaneously, the control schemes are graphically illustrated...

  3. Surface Moisture Measurement System Operation and Maintenance Manual

    International Nuclear Information System (INIS)

    Ritter, G.A.; Pearce, K.L.; Stokes, T.L.

    1995-12-01

    This operations and maintenance manual addresses deployment, equipment and field hazards, operating instructions, calibration verification, removal, maintenance, and other pertinent information necessary to safely operate and store the Surface Moisture Measurement System (SMMS) and Liquid Observation Well Moisture Measurement System (LOWMMS). These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  4. Methodological frontier in operational analysis for roundabouts: a review

    Directory of Open Access Journals (Sweden)

    Orazio Giuffre'

    2016-11-01

    Full Text Available Several studies and researches have shown that modern roundabouts are safe and effective as engineering countermeasures for traffic calming, and they are now widely used worldwide. The increasing use of roundabouts and, more recently, turbo and flower roundabouts, has induced a great variety of experiences in the field of intersection design, traffic safety and capacity modelling. As for unsignalized intersections which represent the starting point to extend knowledge about the operational analysis to roundabouts, the general situation in capacity estimation is still characterized by the discussion between gap acceptance models and empirical regression models. However, capacity modelling must contain both the analytical construction and then solution of the model, and the implementation of driver behavior. Thus, issues on a realistic modelling of driver behavior by the parameters that are included into the models are always of interest for practioners and analysts in transportation and road infrastructure engineering. Based on these considerations, this paper presents a literature review about the key methodological issues in the operational analysis of modern roundabouts. Focus is made on the aspects associated with the gap acceptance behavior, the derivation of the analytical-based models and the calculation of parameters included into the capacity equations, as well as steady state and non-steady state conditions and uncertainty in entry capacity estimation. At last, insights on future developments of the research in this field of investigation will be also outlined.

  5. Analyses of odours from concentrated animal feeding operations: A review

    Science.gov (United States)

    Guffanti, P.; Pifferi, V.; Falciola, L.; Ferrante, V.

    2018-02-01

    Concentrated Animal Feeding Operations (CAFOs) are widely present all over the world due to the high population demand for food and products of animal origin. However, they have generated several environmental concerns, including odour nuisance, which affects people health and quality of life. Odours from livestock are a very complex mixtures of molecules and their analytical investigation is highly demanding. Many works have been published regarding the study of odours from CAFOs, using different techniques and technologies to face the issue. Thus, the aim of this review paper is to summarize all the ways to study odours from CAFOs, starting from the sampling methods and then treating in general the principles of Dynamic Olfactometry, Gas Chromatography coupled with Mass Spectrometry and Electronic Noses. Finally, a deep literature summary of Gas Chromatography coupled with Mass Spectrometry and Electronic Noses applied to odours coming from poultry, dairy and swine feeding operations is reported. This work aims to make some order in this field and it wants to help future researchers to deal with this environmental problem, constituting a state-of-the-art in this field.

  6. Lessons Learned from Sandia National Laboratories' Operational Readiness Review of the Annular Core Research Reactor (ACRR)

    International Nuclear Information System (INIS)

    Bendure, Albert O.; Bryson, James W.

    1999-01-01

    The Sandia ACRR (a Hazard Category 2 Nuclear Reactor Facility) was defueled in June 1997 to modify the reactor core and control system to produce medical radioisotopes for the Department of Energy (DOE) Isotope Production Program. The DOE determined that an Operational Readiness Review (ORR) was required to confirm readiness to begin operations within the revised safety basis. This paper addresses the ORR Process, lessons learned from the Sandia and DOE ORRS of the ACRR, and the use of the ORR to confirm authorization basis implementation

  7. Outline of operation and control system and analytical investigation of transient behavior of an out-of-pile hydrogen production system for HTTR heat utilization system

    International Nuclear Information System (INIS)

    Inagaki, Yoshiyuki; Hada, Kazuhiko; Nishihara, Tetsuo; Takeda, Tetsuaki; Haga, Katsuhiro; Hino, Ryutaro.

    1997-10-01

    The hydrogen production system by steam reforming of natural gas is to be constructed to demonstrate effectiveness of high-temperature nuclear heat utilization systems with the HTTR. Prior to coupling of the steam reforming system with the HTTR, an out-of-pile test system is planned to investigate the system characteristics, to develop high-temperature components such as a reformer, a high-temperature isolation valve and so on, and to verify operation and control technologies and safety technology at accidents. This paper presents outline of operation and control systems and analytical review of transient behavior of the out-of-pile hydrogen production system. Main function of the operation and control systems is made not to give disturbance to the HTTR at transient state under start-up and stop operations. The operation modes are separated into two ones, namely normal and accident operation modes, and operation sequences are made for each operation mode. The normal operation sequence includes start-up, steady operation and stop of the out-of-pile system. The accident one deals with accident conditions at which supply of feed gas is stopped and helium gas is cooled passively by the steam generator. Transient behavior of the out-of-pile system was analyzed numerically according as the operation sequences. As the results, it was confirmed that the designed operation and control systems are adequate to the out-of-pile system. (author)

  8. Operational margin monitoring system for boiling water reactor power plants

    International Nuclear Information System (INIS)

    Fukutomi, S.; Takigawa, Y.

    1992-01-01

    This paper reports on an on-line operational margin monitoring system which has been developed for boiling water reactor power plants to improve safety, reliability, and quality of reactor operation. The system consists of a steady-state core status prediction module, a transient analysis module, a stability analysis module, and an evaluation and guidance module. This system quantitatively evaluates the thermal margin during abnormal transients as well as the stability margin, which cannot be evaluated by direct monitoring of the plant parameters, either for the current operational state or for a predicted operating state that may be brought about by the intended operation. This system also gives operator guidance as to appropriate or alternate operations when the operating state has or will become marginless

  9. Estimation of regulated term of technical systems further operation

    International Nuclear Information System (INIS)

    Strel'nikov, V.P.

    2008-01-01

    The technique of estimating the regulated term of technical systems further operation on the basis of data on failures during operation and use of probabilistic-physical model of failures (DN-distribution) is proposed

  10. Modeling and Control for Islanding Operation of Active Distribution Systems

    DEFF Research Database (Denmark)

    Cha, Seung-Tae; Wu, Qiuwei; Saleem, Arshad

    2011-01-01

    Along with the increasing penetration of distributed generation (DG) in distribution systems, there are more resources for system operators to improve the operation and control of the whole system and enhance the reliability of electricity supply to customers. The distribution systems with DG...... are able to operate in is-landing operation mode intentionally or unintentionally. In order to smooth the transition from grid connected operation to islanding operation for distribution systems with DG, a multi-agent based controller is proposed to utilize different re-sources in the distribution systems...... to stabilize the frequency. Different agents are defined to represent different resources in the distribution systems. A test platform with a real time digital simulator (RTDS), an OPen Connectivity (OPC) protocol server and the multi-agent based intelligent controller is established to test the proposed multi...

  11. Comparison of Management-Operational Efficiency of Agricultural Machinery Operating Systems (Case Study Alborz Province

    Directory of Open Access Journals (Sweden)

    A Omidi

    2017-10-01

    Full Text Available Introduction Measuring the efficiency of operating systems in comparison with the methods of comparing the performance of systems explains the various dimensions of issues such as, the lack of full use of agricultural machinery capacity, improper selection of machine, incorrect use of machinery, ownership, etc.. Any improvement in operating system conditions reduces costs,, consumption of inputs, increases the efficiency of production factors and consequently reduces the price and increases agricultural profitability. The main objective of this research is to compare the operational-management efficiency of operating systems in Alborz province and comparison of managerial and operational efficiency of agricultural machinery farming systems by calculating the efficiency of its major components in agricultural machinery farming systems including efficiency, social, economic, technical-operational and managerial and ranking them in order to understand the optimal model of agricultural machinery systems. Materials and Methods This research is a survey study.The study population was beneficiaries of agricultural machinery in the Alborz province which in the multi-stage random sample was determined. Alborz province has 31,438 agricultural operations, of which 543 are exploited agricultural machinery. Cochran formula was used to determine sample size. Since, Cronbach's alpha coefficient greater than 0.7 was obtained by questionnaire, the reliability of the questionnaires was assessed as desirable. To calculate the efficiency the component data were extracted from 4 specialized questionnaires after the initial examination and encoding, then they were analyzed using the software SPSS, MCDM Engine. TOPSIS techniques were used for ranking managerial performance operating system for operating agricultural machinery Alborz province. Results and Discussion The results showed that social efficiency of dedicated-professional operation with an average of 6.6 had

  12. Operational Characteristics of an Accelerator Driven Fissile Solution System

    International Nuclear Information System (INIS)

    Kimpland, Robert Herbert

    2016-01-01

    Operational characteristics represent the set of responses that a nuclear system exhibits during normal operation. Operators rely on this behavior to assess the status of the system and to predict the consequences of off-normal events. These characteristics largely refer to the relationship between power and system operating conditions. The static and dynamic behavior of a chain-reacting system, operating at sufficient power, is primarily governed by reactivity effects. The science of reactor physics has identified and evaluated a number of such effects, including Doppler broadening and shifts in the thermal neutron spectrum. Often these reactivity effects are quantified in the form of feedback coefficients that serve as coupling coefficients relating the neutron population and the physical mechanisms that drive reactivity effects, such as fissile material temperature and density changes. The operational characteristics of such nuclear systems usually manifest themselves when perturbations between system power (neutron population) and system operating conditions arise. Successful operation of such systems requires the establishment of steady equilibrium conditions. However, prior to obtaining the desired equilibrium (steady-state) conditions, an approach from zero-power (startup) must occur. This operational regime may possess certain limiting system conditions that must be maintained to achieve effective startup. Once steady-state is achieved, a key characteristic of this operational regime is the level of stability that the system possesses. Finally, a third operational regime, shutdown, may also possess limiting conditions of operation that must be maintained. This report documents the operational characteristics of a ''generic'' Accelerator Driven Fissile Solution (ADFS) system during the various operational regimes of startup, steady-state operation, and shutdown. Typical time-dependent behavior for each operational regime will be

  13. Operational Characteristics of an Accelerator Driven Fissile Solution System

    Energy Technology Data Exchange (ETDEWEB)

    Kimpland, Robert Herbert [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-11-28

    Operational characteristics represent the set of responses that a nuclear system exhibits during normal operation. Operators rely on this behavior to assess the status of the system and to predict the consequences of off-normal events. These characteristics largely refer to the relationship between power and system operating conditions. The static and dynamic behavior of a chain-reacting system, operating at sufficient power, is primarily governed by reactivity effects. The science of reactor physics has identified and evaluated a number of such effects, including Doppler broadening and shifts in the thermal neutron spectrum. Often these reactivity effects are quantified in the form of feedback coefficients that serve as coupling coefficients relating the neutron population and the physical mechanisms that drive reactivity effects, such as fissile material temperature and density changes. The operational characteristics of such nuclear systems usually manifest themselves when perturbations between system power (neutron population) and system operating conditions arise. Successful operation of such systems requires the establishment of steady equilibrium conditions. However, prior to obtaining the desired equilibrium (steady-state) conditions, an approach from zero-power (startup) must occur. This operational regime may possess certain limiting system conditions that must be maintained to achieve effective startup. Once steady-state is achieved, a key characteristic of this operational regime is the level of stability that the system possesses. Finally, a third operational regime, shutdown, may also possess limiting conditions of operation that must be maintained. This report documents the operational characteristics of a “generic” Accelerator Driven Fissile Solution (ADFS) system during the various operational regimes of startup, steady-state operation, and shutdown. Typical time-dependent behavior for each operational regime will be illustrated, and key system

  14. Computerized systems of NPP operators support. (Psychological problems)

    International Nuclear Information System (INIS)

    Mashin, V.A.

    1995-01-01

    Operator psychological problems arising in the work with NPP operators support computerized systems (OSCS) are considered. The conclusion is made that the OSCS intellectual application will bring the operator into dangerous dependence on his computerized assistant. To avoid this danger it is necessary by creation of the OSCS to divide specially the tasks areas of the operator and OSCS in order to assure the active role of the operator in the NPP control

  15. Supervision functions - Secure operation of sustainable power systems

    DEFF Research Database (Denmark)

    Morais, Hugo; Zhang, Xinxin; Lind, Morten

    2013-01-01

    The globalization of use of Distributed Generation (DG) and other distributed energy resources in recent years have strongly influenced the power systems operation changes. The growing use of new technologies such as Phasor Measurements Units (PMUs) increases the possibilities and the efficiency...... of power systems operation control. The use of PMUs allows more penetration of DG mainly, with technologies based on renewable resources with intermittent and unpredictable operation such a wind power. This paper introduces the Secure Operation of Sustainable Power Systems (SOSPO) project. The SOSPO...... project tries to respond to the question "How to ensure a secure operation of the future power system where the operating point is heavily is fluctuating?" focusing in the Supervision module architecture and in the power system operation states. The main goal of Supervision module is to determine...

  16. Advanced human-system interface design review guidelines

    International Nuclear Information System (INIS)

    O'Hara, J.M.

    1990-01-01

    Advanced, computer-based, human-system interface designs are emerging in nuclear power plant (NPP) control rooms. These developments may have significant implications for plant safety in that they will greatly affect the ways in which operators interact with systems. At present, however, the only guidance available to the US Nuclear Regulatory Commission (NRC) for the review of control room-operator interfaces, NUREG-0700, was written prior to these technological changes and is thus not designed to address them. The objective of the project reported in this paper is to develop an Advanced Control Room Design Review Guideline for use in performing human factors reviews of advanced operator interfaces. This guideline will be implemented, in part, as a portable, computer-based, interactive document for field use. The paper describes the overall guideline development methodology, the present status of the document, and the plans for further guideline testing and development. 21 refs., 3 figs

  17. Telephone system operations evaluation : before AOS implementation

    Science.gov (United States)

    1999-01-01

    This study provides a detailed baseline analysis of telephone system performance before AOS : implementation. By the time of the preparation of this report, the phone system component of : AOS had not been implemented.

  18. The Design of a Capability-Based Distributed Operating System

    NARCIS (Netherlands)

    Mullender, Sape J.; Tanenbaum, A.S.

    Fifth-generation computer systems will use large numbers of processors to achieve high performance. In this paper a capability-based operating system designed for this environment is discussed. Capability-based operating systems have traditionally required large, complex kernels to manage the use of

  19. Using Sparse Capabilities in a Distributed Operating System

    NARCIS (Netherlands)

    Tanenbaum, Andrew S.; Mullender, Sape J.; van Renesse, Robbert

    Most distributed operating systems constructed to date have lacked a unifying mechanism for naming and protection. In this paper we discuss a system, Amoeba, that uses capabilities for naming and protecting objects. In contrast to traditional, centralized operating systems, in which capabilities are

  20. Describing Elementary Teachers' Operative Systems: A Case Study

    Science.gov (United States)

    Dotger, Sharon; McQuitty, Vicki

    2014-01-01

    This case study introduces the notion of an operative system to describe elementary teachers' knowledge and practice. Drawing from complex systems theory, the operative system is defined as the network of knowledge and practices that constituted teachers' work within a lesson study cycle. Data were gathered throughout a lesson study cycle in which…

  1. EPICS: porting iocCore to multiple operating systems.

    Energy Technology Data Exchange (ETDEWEB)

    Kraimer, M.

    1999-09-30

    An important component of EPICS (Experimental Physics and Industrial Control System) is iocCore, which is the core software in the IOC (input/output controller) front-end processors. Currently iocCore requires the vxWorks operating system. This paper describes the porting of iocCore to other operating systems.

  2. SoOSiM: Operating System and Programming Language Exploration

    NARCIS (Netherlands)

    Baaij, C.P.R.; Kuper, Jan; Schubert, Lutz; Lipari, G.; Cucinotta, T.

    2012-01-01

    SoOSiM is a simulator developed for the purpose of exploring operating system concepts and operating system modules. The simulator provides a highly abstracted view of a computing system, consisting of computing nodes, and components that are concurrently executed on these nodes. OS modules are

  3. The Impact of Parallel Processing on Operating Systems

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2009-07-01

    Full Text Available The base entity in computer programming is the process or task. The parallelism can be achieved by executing multiple processes on different processors. Distributed systems are managed by distributed operating systems that represent the extension for multiprocessor architectures of multitasking and multiprogramming operating systems.

  4. Technology and Policy Challenges in the Adoption and Operation of Health Information Exchange Systems.

    Science.gov (United States)

    Ji, Hyerim; Yoo, Sooyoung; Heo, Eun-Young; Hwang, Hee; Kim, Jeong-Whun

    2017-10-01

    This study aimed to identify problems and issues that arise with the implementation of online health information exchange (HIE) systems in a medical environment and to identify solutions to facilitate the successful operation of future HIE systems in primary care clinics and hospitals. In this study, the issues that arose during the establishment and operation of an HIE system in a hospital were identified so that they could be addressed to enable the successful establishment and operation of a standard-based HIE system. After the issues were identified, they were reviewed and categorized by a group of experts that included medical information system experts, doctors, medical information standard experts, and HIE researchers. Then, solutions for the identified problems were derived based on the system development, operation, and improvement carried out during this work. Twenty-one issues were identified during the implementation and operation of an online HIE system. These issues were then divided into four categories: system architecture and standards, documents and data items, consent of HIE, and usability. We offer technical and policy recommendations for various stakeholders based on the experiences of operating and improving the online HIE system in the medical field. The issues and solutions identified in this study regarding the implementation and operate of an online HIE system can provide valuable insight for planners to enable them to successfully design and operate such systems at a national level in the future. In addition, policy support from governments is needed.

  5. Operational Readiness Review Plan for the Radioisotope Thermoelectric Generator Materials Production Tasks

    Science.gov (United States)

    Cooper, R. H.; Martin, M. M.; Riggs, C. R.; Beatty, R. L.; Ohriner, E. K.; Escher, R. N.

    1990-04-19

    In October 1989, a US shuttle lifted off from Cape Kennedy carrying the spacecraft Galileo on its mission to Jupiter. In November 1990, a second spacecraft, Ulysses, will be launched from Cape Kennedy with a mission to study the polar regions of the sun. The prime source of power for both spacecraft is a series of radioisotope thermoelectric generators (RTGs), which use plutonium oxide (plutonia) as a heat source. Several of the key components in this power system are required to ensure the safety of both the public and the environment and were manufactured at Oak Ridge National Laboratory (ORNL) in the 1980 to 1983 period. For these two missions, Martin Marietta Energy Systems, Inc. (Energy Systems), will provide an iridium alloy component used to contain the plutonia heat source and a carbon composite material that serves as a thermal insulator. ORNL alone will continue to fabricate the carbon composite material. Because of the importance to DOE that Energy Systems deliver these high quality components on time, performance of an Operational Readiness Review (ORR) of these manufacturing activities is necessary. Energy Systems Policy GP 24 entitled "Operational Readiness Process" describes the formal and comprehensive process by which appropriate Energy Systems activities are to be reviewed to ensure their readiness. This Energy System policy is aimed at reducing the risks associated with mission success and requires a management approved "readiness plan" to be issued. This document is the readiness plan for the RTG materials production tasks.

  6. ARIES nondestructive assay system operation and performance

    International Nuclear Information System (INIS)

    Cremers, Teresa L.; Hansen, Walter J.; Herrera, Gary D.; Nelson, David C.; Sampson, Thomas E.; Scheer, Nancy L.

    2000-01-01

    The ARIES (Advanced Recovery and Integrated Extraction System) Project is an integrated system at the Los Alamos Plutonium Facility for the dismantlement of nuclear weapons. The plutonium produced by the ARIES process was measured by an integrated nondestructive assay (NDA) system. The performance of the NDA systems was monitored by a measurement control program which is a part of a nuclear material control and accountability system. In this paper we will report the results of the measurements of the measurement control standards as well as an overview of the measurement of the ARIES process materials

  7. Operation method and operation control device for emergency core cooling system

    Energy Technology Data Exchange (ETDEWEB)

    Kinoshita, Shoichiro; Takahashi, Toshiyuki; Fujii, Tadashi [Hitachi Ltd., Tokyo (Japan); Mizutani, Akira

    1996-05-07

    The present invention provides a method of reducing continuous load capacity of an emergency cooling system of a BWR type reactor and a device reducing a rated capacity of an emergency power source facility. Namely, the emergency core cooling system comprises a first cooling system having a plurality of power source systems based on a plurality of emergency power sources and a second cooling system having a remaining heat removing function. In this case, when the first cooling system is operated the manual starting under a predetermined condition that an external power source loss event should occur, a power source division different from the first cooling system shares the operation to operate the secondary cooling system simultaneously. Further, the first cooling system is constituted as a high pressure reactor core water injection system and the second cooling system is constituted as a remaining heat removing system. With such a constitution, a high pressure reactor core water injection system for manual starting and a remaining heat removing system of different power source division can be operated simultaneously before automatic operation of the emergency core cooling system upon loss of external power source of a nuclear power plant. (I.S.)

  8. Independent transmission system operators and their role in maintaining reliability in a restructured electric power industry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    This report summarizes the current status of proposals to form Independent System Operators (ISOs) to operate high-voltage transmission systems in the United States and reviews their potential role in maintaining bulk power system reliability. As background information, the likely new industry structure, nature of deregulated markets, and institutional framework for bulk power system reliability are reviewed. The report identifies issues related to the formation of ISOs and their roles in markets and in reliability, and describes potential policy directions for encouraging the formation of effective ISOs and ensuring bulk system reliability. Two appendices are provided, which address: (1) system operation arrangements in other countries, and (2) summaries of regional U.S. ISO proposals.

  9. Daily/Hourly Hydrosystem Operation : How the Columbia River System Responds to Short-Term Needs.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1994-02-01

    The System Operation Review, being conducted by the Bonneville Power Administration, the US Army Corps of Engineers, and the US Bureau of Reclamation, is analyzing current and potential future operations of the Columbia River System. One goal of the System Operations Review is to develop a new System Operation Strategy. The strategy will be designed to balance the many regionally and nationally important uses of the Columbia River system. Short-term operations address the dynamics that affect the Northwest hydro system and its multiple uses. Demands for electrical power and natural streamflows change constantly and thus are not precisely predictable. Other uses of the hydro system have constantly changing needs, too, many of which can interfere with other uses. Project operators must address various river needs, physical limitations, weather, and streamflow conditions while maintaining the stability of the electric system and keeping your lights on. It takes staffing around the clock to manage the hour-to-hour changes that occur and the challenges that face project operators all the time.

  10. Disability Case Adjudication and Review System

    Data.gov (United States)

    Social Security Administration — DICARS is the legacy system supporting business processes in the Disability Quality Branches (DQBs). It supports quality reviews of DDS disability determinations....

  11. PUMA: An Operating System for Massively Parallel Systems

    Directory of Open Access Journals (Sweden)

    Stephen R. Wheat

    1994-01-01

    Full Text Available This article presents an overview of PUMA (Performance-oriented, User-managed Messaging Architecture, a message-passing kernel for massively parallel systems. Message passing in PUMA is based on portals – an opening in the address space of an application process. Once an application process has established a portal, other processes can write values into the portal using a simple send operation. Because messages are written directly into the address space of the receiving process, there is no need to buffer messages in the PUMA kernel and later copy them into the applications address space. PUMA consists of two components: the quintessential kernel (Q-Kernel and the process control thread (PCT. Although the PCT provides management decisions, the Q-Kernel controls access and implements the policies specified by the PCT.

  12. OPERATIONAL ACCURACY IMPROVEMENT OF DIGITAL SERVO SYSTEM CONTAINING UNBALANCED LOAD

    Directory of Open Access Journals (Sweden)

    A. G. Stryzhniou

    2013-01-01

    Full Text Available The paper considers a structural flowchart of a typical digital servo system and its operational principle. A method for determination of the unbalanced load effect on the accuracy of the system operation is described in the paper. The paper proposes a method for compensation of the  unbalanced load influence on the system operation. The experimental verification of the unbalanced load effect on the operational accuracy of the servo system and compensation of these influences have been executed in the paper.

  13. System Shock: The Archetype of Operational Shock

    Science.gov (United States)

    2017-05-25

    Printing Office, 2015. Arreguín-Toft, Ivan. “How the Weak Win Wars.” International Security 26, no. 1 (Summer 2001): 93–128. Axelrod, Robert M. and...with a framework to fight and win in Grey Zone environments and that this concept nests within Unified Land Operations (ULO) doctrine by testing three... Robert L. Smith, COL ___________________________________, Director, School of Advanced Military Studies James C. Markert, COL Accepted this 25th

  14. Perception of the HACCP system operators on livestock product manufacturers.

    Science.gov (United States)

    Kim, Jung-Hyun; Nam, Ki-Chang; Jo, Cheorun; Lim, Dong-Gyun

    2014-01-01

    The purpose of this study was to investigate crucial factors on HACCP system implementation in domestic livestock product plants, and to offer job satisfaction and the career prospect of HACCP system operators. The survey was carried out by selecting 150 HACCP system operators who implemented HACCP system. The respondents claimed that the most important contents in HACCP system operation were to assemble HACCP team (21.8%), and the second was to monitoring (20.0%). Documentation and recording (16.9%) and verification (11.1%) were followed. The respondents answered the major factor in sanitation management was cleaning/washing/disinfection (18.9%) and inspection (18.4%). The results showed that there were significant differences in the prospect of occupation in HACCP system operator by the gender (p HACCP system operator were satisfied with their job (73%) and also showed optimistic prospect of occupation (82%).

  15. Safety management of a complex R and D ground operating system

    Science.gov (United States)

    Connors, J. F.; Maurer, R. A.

    1975-01-01

    A perspective on safety program management was developed for a complex R&D operating system, such as the NASA-Lewis Research Center. Using a systems approach, hazardous operations are subjected to third-party reviews by designated-area safety committees and are maintained under safety permit controls. To insure personnel alertness, emergency containment forces and employees are trained in dry-run emergency simulation exercises. The keys to real safety effectiveness are top management support and visibility of residual risks.

  16. Safety management of a complex R&D ground operating system

    Science.gov (United States)

    Connors, J. F.; Maurer, R. A.

    1975-01-01

    A perspective on safety program management has been developed for a complex R&D operating system, such as the NASA-Lewis Research Center. Using a systems approach, hazardous operations are subjected to third-party reviews by designated area safety committees and are maintained under safety permit controls. To insure personnel alertness, emergency containment forces and employees are trained in dry-run emergency simulation exercises. The keys to real safety effectiveness are top management support and visibility of residual risks.

  17. Advanced nuclear systems. Review study; Fortgeschrittene Nuklearsysteme. Review Study

    Energy Technology Data Exchange (ETDEWEB)

    Liebert, Wolfgang; Glaser, Alexander; Pistner, Christoph [Interdisziplinaere Arbeitsgruppe Naturwissenschaft, Technik und Sicherheit (IANUS), Darmstadt University of Technology, Hochschulstrasse 10, D-64289 Darmstadt (Germany); Baehr, Roland; Hahn, Lothar [Institute for applied ecology (Oeko-Institut), Elisabethenstrasse 55-57, D-64283 Darmstadt (Germany)

    1999-04-01

    The task of this review study is to from provide an overview of the developments in the field of the various advanced nuclear systems, and to create the basis for more comprehensive studies of technology assessment. In an overview the concepts for advanced nuclear systems pursued worldwide are subdivided into eight subgroups. A coarse examination raster (set pattern) is developed to enable a detailed examination of the selected systems. In addition to a focus on enhanced safety features, further aspects are also taken into consideration, like the lowering of the proliferation risk, the enhancement of the economic competitiveness of the facilities and new usage possibilities (for instance concerning the relaxation of the waste disposal problem or the usage of alternative fuels to uranium). The question about the expected time span for realization and the discussion about the obstacles on the way to a commercially usable reactor also play a substantial role as well as disposal requirements as far as they can be presently recognized. In the central chapter of this study, the documentation of the representatively selected concepts is evaluated as well as existing technology assessment studies and expert opinions. In a few cases where this appears to be necessary, according technical literature, further policy advisory reports, expert statements as well as other relevant sources are taken into account. Contradictions, different assessments and dissents in the literature as well as a few unsettled questions are thus indicated. The potential of advanced nuclear systems with respect to economical and societal as well as environmental objectives cannot exclusively be measured by the corresponding intrinsic or in comparison remarkable technical improvements. The acceptability of novel or improved systems in nuclear technology will have to be judged by their convincing solutions for the crucial questions of safety, nuclear waste and risk of proliferation of nuclear weapons

  18. Ecological Systems Theory in "School Psychology Review"

    Science.gov (United States)

    Burns, Matthew K.; Warmbold-Brann, Kristy; Zaslofsky, Anne F.

    2015-01-01

    Ecological systems theory (EST) has been suggested as a framework to provide effective school psychology services, but previous reviews of research found questionable consistency between methods and the principles of EST. The current article reviewed 349 articles published in "School Psychology Review" (SPR) between 2006 and 2015 and…

  19. Linear operator inequalities for strongly stable weakly regular linear systems

    NARCIS (Netherlands)

    Curtain, RF

    2001-01-01

    We consider the question of the existence of solutions to certain linear operator inequalities (Lur'e equations) for strongly stable, weakly regular linear systems with generating operators A, B, C, 0. These operator inequalities are related to the spectral factorization of an associated Popov

  20. Experiences with the Amoeba distributed operating system

    NARCIS (Netherlands)

    Tanenbaum, Andrew S.; van Renesse, Robbert; van Staveren, Hans; Sharp, Gregory J.; Mullender, Sape J.; Jansen, Jack; van Rossum, Guido

    1990-01-01

    The Amoeba project is a research effort aimed at understanding how to connect multiple computers in a seamless way [16, 17, 26, 27, 31]. The basic idea is to provide the users with the illusion of a single powerful timesharing system, when, in fact, the system is implemented on a collection of

  1. Towards an operating system for intercloud

    NARCIS (Netherlands)

    Strijkers, R.J.; Cushing, R.; Makkes, M.X.; Meulenhoff, P.J.; Belloum, A.; Laat, C.D.; Meijer, R.J.

    2013-01-01

    Cyber physical systems, such as intelligent dikes and smart energy systems, require scalable and flexible computing infrastructures to process data from instruments and sensor networks. Infrastructure as a Service clouds provide a flexible way to allocate remote distributed resources, but lack

  2. 7 CFR 3411.10 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... INITIATIVE COMPETITIVE GRANTS PROGRAM Scientific Peer Review of Research Grant Applications § 3411.10 Establishment and operation of peer review groups. Subject to § 3411.5, the Administrator shall adopt procedures... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups...

  3. 7 CFR 3401.12 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... GRANTS PROGRAM Scientific Peer Review of Research Applications for Funding § 3401.12 Establishment and operation of peer review groups. Subject to § 3401.7, the Administrator will adopt procedures for the... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups...

  4. 7 CFR 3415.10 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... ASSESSMENT RESEARCH GRANTS PROGRAM Scientific Peer Review of Research Grant Applications § 3415.10 Establishment and operation of peer review groups. Subject to § 3415.5, the Administrator shall adopt procedures... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups...

  5. 42 CFR 52h.3 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-10-01

    ... GRANTS SCIENTIFIC PEER REVIEW OF RESEARCH GRANT APPLICATIONS AND RESEARCH AND DEVELOPMENT CONTRACT PROJECTS § 52h.3 Establishment and operation of peer review groups. (a) To the extent applicable, the... 42 Public Health 1 2010-10-01 2010-10-01 false Establishment and operation of peer review groups...

  6. 7 CFR 3400.10 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... GRANTS PROGRAM Scientific Peer Review of Research Grant Applications § 3400.10 Establishment and operation of peer review groups. Subject to § 3400.5, the Administrator will adopt procedures for the... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups...

  7. Knowledge-based operator guidance system for Japanese PWRs

    International Nuclear Information System (INIS)

    Fujita, Y.; Ito, K.; Kawanago, S.; Tani, M.; Murata, R.

    1986-01-01

    A knowledge-based operator support system for nuclear power plant operation is under development. The main theme of the study is the incorporation of operator's cognitive structure as the framework of the knowledge representation and inference control mechanisms. Based upon information collected from interviews, and experiments using a real-time simulator, an operator's model related to diagnostic tasks was developed. A knowledge-based system incorporating the proposed model demonstrated highly efficient problem solving capabilities and the dynamic fitness to operator's perceptual feeling, thereby suggesting the potential importance and practical benefit of such a study

  8. A Structuring Framework for Distributed Operating Systems

    Science.gov (United States)

    1988-07-01

    appropriate server(s) Lt that time to carry out the service- The service manager (s) at server’s site(s) finally pass a request to the server(s) waiting...servers. A client. calling a print operation doesn’t care which print server actually performs the request. The corresponding service manager at the...region is terminated. The print request is finally forwarded to the selected print server. The service manager at a client’s site takes the following

  9. Review of current status for designing severe accident management support system

    International Nuclear Information System (INIS)

    Jeong, Kwang Sub

    2000-05-01

    The development of operator support system (OSS) is ongoing in many other countries due to the complexity both in design and in operation for nuclear power plant. The computerized operator support system includes monitoring of some critical parameters, early detection of plant transient, monitoring of component status, plant maintenance, and safety parameter display, and the operator support system for these areas are developed and are being used in some plants. Up to now, the most operator support system covers the normal operation, abnormal operation, and emergency operation. Recently, however, the operator support system for severe accident is to be developed in some countries. The study for the phenomena of severe accident is not performed sufficiently, but, based on the result up to now, the operator support system even for severe accident will be developed in this study. To do this, at first, the current status of the operator support system for normal/abnormal/emergency operation is reviewed, and the positive aspects and negative aspects of systems are analyzed by their characteristics. And also, the major items that should be considered in designing the severe accident operator support system are derived from the review. With the survey of domestic and foreign operator support systems, they are reviewed in terms of the safety parameter display system, decision-making support system, and procedure-tracking system. For the severe accident, the severe accident management guideline (SAMG) which is developed by Westinghouse is reviewed; the characteristics, structure, and logical flow of SAMG are studied. In addition, the critical parameters for severe accident, which are the basis for operators decision-making in severe accident management and are supplied to the operators and the technical support center, are reviewed, too

  10. Operator psychological selection system for nuclear power plant

    International Nuclear Information System (INIS)

    He Xuhong; Huang Xiangrui

    2004-01-01

    Based on a detailed job analysis of nuclear power plant operator including operation procedures analysis, interview with personnel familiar with operator job, and 9 events happened in the past in the plant involved operator error analysis, several operator work characteristics and performance influence factors are obtained. According to these specific characteristics and factors, referring to the psychological selection research results in the other related critical occupational fields, a full psychological selection system of nuclear power plant operator is forwarded in this paper, including 21 dimensions in 3 facets as general psychological ability, personality and psychological healthy. Practical measurement methods for the proposed selection dimensions are discussed in the end

  11. Economic Operation of Power Systems with Significant Wind Power Penetration

    DEFF Research Database (Denmark)

    Farashbashi-Astaneh, Seyed-Mostafa

    This dissertation addresses economic operation of power systems with high penetration of wind power. Several studies are presented to address the economic operation of power systems with high penetration of variable wind power. The main concern in such power systems is high variability...... and unpredictability. Unlike conventional power plants, the output power of a wind farm is not controllable. This brings additional complexity to operation and planning of wind dominant power systems. The key solution in face of wind power uncertainty is to enhance power system flexibility. The enhanced flexibility......, cooperative wind-storage operation is studied. Lithium-Ion battery units are chosen as storage units. A novel formulation is proposed to investigate optimal operation of a storage unit considering power system balancing conditions and wind power imbalances. An optimization framework is presented to increase...

  12. A Framework for Enterprise Operating Systems Based on Zachman Framework

    Science.gov (United States)

    Ostadzadeh, S. Shervin; Rahmani, Amir Masoud

    Nowadays, the Operating System (OS) isn't only the software that runs your computer. In the typical information-driven organization, the operating system is part of a much larger platform for applications and data that extends across the LAN, WAN and Internet. An OS cannot be an island unto itself; it must work with the rest of the enterprise. Enterprise wide applications require an Enterprise Operating System (EOS). Enterprise operating systems used in an enterprise have brought about an inevitable tendency to lunge towards organizing their information activities in a comprehensive way. In this respect, Enterprise Architecture (EA) has proven to be the leading option for development and maintenance of enterprise operating systems. EA clearly provides a thorough outline of the whole information system comprising an enterprise. To establish such an outline, a logical framework needs to be laid upon the entire information system. Zachman Framework (ZF) has been widely accepted as a standard scheme for identifying and organizing descriptive representations that have prominent roles in enterprise-wide system development. In this paper, we propose a framework based on ZF for enterprise operating systems. The presented framework helps developers to design and justify completely integrated business, IT systems, and operating systems which results in improved project success rate.

  13. Remote operations and interactions for systems of arbitrary-dimensional Hilbert space: State-operator approach

    International Nuclear Information System (INIS)

    Reznik, Benni; Groisman, Berry; Aharonov, Yakir

    2002-01-01

    We present a systematic simple method for constructing deterministic remote operations on single and multiple systems of arbitrary discrete dimensionality. These operations include remote rotations, remote interactions, and measurements. The resources needed for an operation on a two-level system are one ebit and a bidirectional communication of two cbits, and for an n-level system, a pair of entangled n-level particles and two classical 'nits'. In the latter case, there are n-1 possible distinct operations per n-level entangled pair. Similar results apply for generating interaction between a pair of remote systems, while for remote measurements only one-directional classical communication is needed. We further consider remote operations on N spatially distributed systems, and show that the number of possible distinct operations increases here exponentially, with the available number of entangled pairs that are initially distributed between the systems. Our results follow from the properties of a hybrid state-operator object (stator), which describes quantum correlations between states and operations

  14. Country Operational Plan and Reporting System

    Data.gov (United States)

    US Agency for International Development — This web-based information system allows for the annual entry and updating of Emergency Plan COPs, annual and semiannual program results, and budget information by...

  15. IAEA activity on operator support systems in nuclear power plants

    International Nuclear Information System (INIS)

    Dounaev, V.; Fujita, Y.; Juslin, K.; Haugset, K.; Lux, I.; Naser, J.

    1994-01-01

    Various operator support systems for nuclear power plants are already operational or under development in the IAEA Member States. Operator support systems are based on intelligent data processing and, in addition to plant operation, they are also becoming more important for safety. A key feature of operator support systems is their availability to restructure data to increase its relevance for a given situation. This can improve the user's ability to identify plant mode, system state, and component state and to identify and diagnose faults. Operator support systems can also assist the user in planning and implementing corrective actions to improve the nuclear power plant's availability and safety. In September 1991, the IAEA Committee for Contractual Scientific Services approved the Co-ordinated Research Programme (CRP) on ''Operator Support Systems in Nuclear Power Plants'' in the framework of the Project ''Man-Machine Interface Studies''. The main objective of this programme is to provide guidance and technology transfer for the development and implementation of operator support systems. This includes the experience with human-machine interfaces and closely related issues such as instrumentation and control, the use of computers in nuclear power plants, and operator qualification. (author)

  16. Reactor helium system, design specification, operation and handling

    International Nuclear Information System (INIS)

    Badrljica, R.

    1984-06-01

    Apart from detailed design specification of the helium cover gas system of the Ra reactor, this document includes description of the operating regime, instructions for manipulations in the system with the aim of achieving and maintaining stationary gas circulation [sr

  17. Environmental management system for transportation maintenance operations : [technical brief].

    Science.gov (United States)

    2014-04-01

    This report provides the framework for the environmental management system to analyze : greenhouse gas emissions from transportation maintenance operations. The system enables user : to compare different scenarios and make informed decisions to minim...

  18. Mars Telecommunications Orbiter Ka-band system design and operations

    Science.gov (United States)

    Noreen, Gary; Komarek, Tomas; Diehl, Roger; Shambayati, Shervin; Breidenthal, Julian; Lopez, Saturnino; Jordan, Frank

    2003-01-01

    NASA's Mars Telecommunications Orbiter (MTO) will relay broadband communications from landers, rovers and spacecraft in the vicinity of Mars to Earth. This paper describes the MTO communications system and how the MTO Ka-band system will be operated.

  19. Elements for Effective Management of Operating Pump and Treat Systems

    Science.gov (United States)

    This fact sheet summarizes key aspects of effective management for operating pump and treat (P&T) systems based on lessons learned from conducting optimization evaluations at 20 Superfund-financed P&T systems.

  20. Plutonium active operation of the Winfrith modular containment system

    International Nuclear Information System (INIS)

    Sanders, M.J.; Pengelly, M.G.A.; McSherry, K.

    1985-01-01

    Three gloveboxes contaminated with plutonium have been dismantled inside the Winfrith Modular Containment System. This system is a portable, demountable pressurised suit area with its own filters and shower entry tunnel. Details of the operation are given. (U.K.)

  1. The Effect of Degraded Digital Instrumentation and Control systems on Human-system Interfaces and Operator Performance

    Energy Technology Data Exchange (ETDEWEB)

    OHara, J.M.; Gunther, B.; Martinez-Guridi, G. (BNL); Xing, J.; Barnes, V. (NRC)

    2010-11-07

    Integrated digital instrumentation and control (I&C) systems in new and advanced nuclear power plants (NPPs) will support operators in monitoring and controlling the plants. Even though digital systems typically are expected to be reliable, their potential for degradation or failure significantly could affect the operators performance and, consequently, jeopardize plant safety. This U.S. Nuclear Regulatory Commission (NRC) research investigated the effects of degraded I&C systems on human performance and on plant operations. The objective was to develop technical basis and guidance for human factors engineering (HFE) reviews addressing the operator's ability to detect and manage degraded digital I&C conditions. We reviewed pertinent standards and guidelines, empirical studies, and plant operating experience. In addition, we evaluated the potential effects of selected failure modes of the digital feedwater control system of a currently operating pressurized water reactor (PWR) on human-system interfaces (HSIs) and the operators performance. Our findings indicated that I&C degradations are prevalent in plants employing digital systems, and the overall effects on the plant's behavior can be significant, such as causing a reactor trip or equipment to operate unexpectedly. I&C degradations may affect the HSIs used by operators to monitor and control the plant. For example, deterioration of the sensors can complicate the operators interpretation of displays, and sometimes may mislead them by making it appear that a process disturbance has occurred. We used the findings as the technical basis upon which to develop HFE review guidance.

  2. Development of lung cancer CT screening operating support system

    Science.gov (United States)

    Ishigaki, Rikuta; Hanai, Kozou; Suzuki, Masahiro; Kawata, Yoshiki; Niki, Noboru; Eguchi, Kenji; Kakinuma, Ryutaro; Moriyama, Noriyuki

    2009-02-01

    In Japan, lung cancer death ranks first among men and third among women. Lung cancer death is increasing yearly, thus early detection and treatment are needed. For this reason, CT screening for lung cancer has been introduced. The CT screening services are roughly divided into three sections: office, radiology and diagnosis sections. These operations have been performed through paper-based or a combination of paper-based and an existing electronic health recording system. This paper describes an operating support system for lung cancer CT screening in order to make the screening services efficient. This operating support system is developed on the basis of 1) analysis of operating processes, 2) digitalization of operating information, and 3) visualization of operating information. The utilization of the system is evaluated through an actual application and users' survey questionnaire obtained from CT screening centers.

  3. Operation quality assessment model for video conference system

    Science.gov (United States)

    Du, Bangshi; Qi, Feng; Shao, Sujie; Wang, Ying; Li, Weijian

    2018-01-01

    Video conference system has become an important support platform for smart grid operation and management, its operation quality is gradually concerning grid enterprise. First, the evaluation indicator system covering network, business and operation maintenance aspects was established on basis of video conference system's operation statistics. Then, the operation quality assessment model combining genetic algorithm with regularized BP neural network was proposed, which outputs operation quality level of the system within a time period and provides company manager with some optimization advice. The simulation results show that the proposed evaluation model offers the advantages of fast convergence and high prediction accuracy in contrast with regularized BP neural network, and its generalization ability is superior to LM-BP neural network and Bayesian BP neural network.

  4. Standard hydrogen monitoring system - E operation and maintenance manual

    International Nuclear Information System (INIS)

    Schneider, T.C.

    1997-01-01

    The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System- E (SHMS-E) used in the 200E and 20OW area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course for SHMS, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted

  5. Standard Hydrogen Monitoring System-D operation and maintenance manual

    International Nuclear Information System (INIS)

    Schneider, T.C.

    1997-01-01

    The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System-D (SHMS-D) used in the 200E and 200W area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course No. 351405, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted

  6. Review of Long Wave Dynamics over Reefs and into Ports with Implication for Port Operations

    Directory of Open Access Journals (Sweden)

    Ap van Dongeren

    2016-02-01

    Full Text Available This paper reviews the dynamics of infragravity (long-period waves over reef systems and the consequences of these waves for operations in ports located behind reefs with particular attention to Western Australia. Swells which originate in the Southern Ocean generate long (infragravity waves, which propagate to the coast. On the reef edge, the swell waves are largely dissipated, transferring energy to turbulence and heat but also in that process generating long wave energy. The remaining swell waves are dominated by the infragravity waves and propagate towards the mainland and into port basins where they cause moored ship motions with consequences for the operational downtime of the port’s operations. When contemplating solutions to mitigate the impact of the long wave problems, these may be addressed from two sides: from the load side (waves and the strength side (mooring. The former will be discussed in this paper.

  7. SoOSiM: Operating System and Programming Language Exploration

    OpenAIRE

    Baaij, C.P.R.; Kuper, Jan; Schubert, Lutz; Lipari, G.; Cucinotta, T.

    2012-01-01

    SoOSiM is a simulator developed for the purpose of exploring operating system concepts and operating system modules. The simulator provides a highly abstracted view of a computing system, consisting of computing nodes, and components that are concurrently executed on these nodes. OS modules are subsequently modelled as components that progress as a result of reacting to two types of events: messages from other components, or a system-wide tick event. Using this abstract view, a developer can ...

  8. Control, Operator Support and Safety System of PVC-reactors

    Directory of Open Access Journals (Sweden)

    Jens I. Ytreeide

    1997-01-01

    Full Text Available In modern petrochemical plants the corporate and societal demands to plant safety and minimum environmental effects are high. These demands rise high performance requirements to the technical systems, specially the process control and safety systems including an effective operator support system with fault detection capability. The systems must have high reliability also against erroneous operations which may cause shutdown situations or quality deviations.

  9. SALTO Peer Review Guidelines. Guidelines for Peer Review of Safety Aspects of Long Term Operation of Nuclear Power Plants

    International Nuclear Information System (INIS)

    2014-01-01

    International peer review is a useful tool for Member States to exchange experiences, learn from each other and apply good practices in the long term operation (LTO) of nuclear power plants (NPPs). The peer review is also an important mechanism through which the IAEA supports Member States in enhancing the safety of NPPs. The IAEA has conducted various types of safety review that indirectly address aspects of LTO, including safety reviews for design, engineering, operation and external hazards. Operational Safety Review Team (OSART) services include review of ageing management programmes. In addition, several Member States have requested Ageing Management Assessment Team (AMAT) missions. Through these experiences, it was recognized that a comprehensive peer review on LTO would be very useful to Member States. The Safety Aspects of Long Term Operation (SALTO) peer review addresses strategy and key elements for the safe LTO of NPPs, which includes AMAT objectives and complements OSART reviews. The SALTO peer review is designed to assist operating organizations in adopting a proper approach to LTP including implementing appropriate activities to ensure that plant safety will be maintained during the LTO period. The SALTO peer review can be tailored to focus on ageing management programmes (AMPs) or on other activities related to LTO to support the Member State in enhancing the safety of its NPPs. The SALTO peer review can also support regulators in establishing or improving regulatory and licensing strategies for the LTO of NPPs. The guidelines in this publication are primarily intended for members of a SALTO review team and provide a basic structure and common reference for peer reviews of LTO. Additionally, the guidelines also provide useful information to the operating organizations of NPPs (or technical support organizations) for carrying out their own self-assessments or comprehensive programme reviews. The guidelines are intended to be generic, as there are

  10. Book Review: Organizations: A Systems Approach

    DEFF Research Database (Denmark)

    Schoeneborn, Dennis

    2016-01-01

    Review of: Stefan Kühl: Organizations. A Systems Approach (trans. P. Schmitz). Farnham: Gower Publishing, 2013. 195 pp. £14.99. ISBN 9781472413413.......Review of: Stefan Kühl: Organizations. A Systems Approach (trans. P. Schmitz). Farnham: Gower Publishing, 2013. 195 pp. £14.99. ISBN 9781472413413....

  11. Optimal Operation of Radial Distribution Systems Using Extended Dynamic Programming

    DEFF Research Database (Denmark)

    Lopez, Juan Camilo; Vergara, Pedro P.; Lyra, Christiano

    2018-01-01

    An extended dynamic programming (EDP) approach is developed to optimize the ac steady-state operation of radial electrical distribution systems (EDS). Based on the optimality principle of the recursive Hamilton-Jacobi-Bellman equations, the proposed EDP approach determines the optimal operation...... approach is illustrated using real-scale systems and comparisons with commercial programming solvers. Finally, generalizations to consider other EDS operation problems are also discussed....

  12. Induction Motors Most Efficient Operation Points in Pumped Storage Systems

    DEFF Research Database (Denmark)

    Busca-Forcos, Andreea; Marinescu, Corneliu; Busca, Cristian

    2015-01-01

    efficiency is desired especially when operating with renewable energy systems, which present low energy conversion factor (up to 50% - performance coefficient for wind turbines, and efficiency up to 40% for photovoltaic systems). In this paper the most efficient operation points of the induction motors...

  13. OSIRIS : Efficient and consistent recovery of compartmentalized operating systems

    NARCIS (Netherlands)

    Bhat, Koustubha; Vogt, Dirk; Kouwe, Erik Van Der; Gras, Ben; Sambuc, Lionel; Tanenbaum, Andrew S.; Bos, Herbert; Giuffrida, Cristiano

    2016-01-01

    Much research has gone into making operating systems more amenable to recovery and more resilient to crashes. Traditional solutions rely on partitioning the operating system (OS) to contain the effects of crashes within compartments and facilitate modular recovery. However, state dependencies among

  14. A model of the gas analysis system operation process

    Science.gov (United States)

    Yakimenko, I. V.; Kanishchev, O. A.; Lyamets, L. L.; Volkova, I. V.

    2017-12-01

    The characteristic features of modeling the gas-analysis measurement system operation process on the basis of the semi-Markov process theory are discussed. The model of the measuring gas analysis system operation process is proposed, which makes it possible to take into account the influence of the replacement interval, the level of reliability and maintainability and to evaluate the product reliability.

  15. Operational test report for 2706-T complex liquid transfer system

    International Nuclear Information System (INIS)

    BENZEL, H.R.

    1999-01-01

    This document is the Operational Test Report (OTR). It enters the Record Copy of the W-259 Operational Test Procedure (HNF-3610) into the document retrieval system. Additionally, the OTR summarizes significant issues associated with testing the 2706-T waste liquid transfer and storage system

  16. Demonstrating Operating System Principles via Computer Forensics Exercises

    Science.gov (United States)

    Duffy, Kevin P.; Davis, Martin H., Jr.; Sethi, Vikram

    2010-01-01

    We explore the feasibility of sparking student curiosity and interest in the core required MIS operating systems course through inclusion of computer forensics exercises into the course. Students were presented with two in-class exercises. Each exercise demonstrated an aspect of the operating system, and each exercise was written as a computer…

  17. An intelligent operator support system for Dynamic positioning

    NARCIS (Netherlands)

    Diggelen, J. van; Broek, J. van den; Schraagen, J.M.C.; Waa, J.S. van der

    2017-01-01

    This paper proposes a human-centered approach to Dynamic Positioning systems which combines multiple technologies in an intelligent operator support system (IOSS). IOSS allows the operator to be roaming and do other tasks in quiet conditions. When conditions become more demanding, the IOSS calls the

  18. An intelligent operator support system for dynamic positioning

    NARCIS (Netherlands)

    Diggelen, J. van; Broek, J. van den; Schraagen, J.M.C.; Waa, J.S. van der

    2018-01-01

    This paper proposes a human-centered approach to Dynamic Position-ing systems which combines multiple technologies in an intelligent operator sup-port system (IOSS). IOSS allows the operator to be roaming and do other tasks in quiet conditions. When conditions become more demanding, the IOSS calls

  19. Operational experience with a CID camera system

    CERN Document Server

    Welsch, Carsten P; Burel, Bruno; Lefèvre, Thibaut

    2006-01-01

    In future high intensity, high energy accelerators particle losses must be minimized as activation of the vacuum chambers or other components makes maintenance and upgrade work time consuming and costly. It is imperative to have a clear understanding of the mechanisms that can lead to halo formation, and to have the possibility to test available theoretical models with an adequate experimental setup. Measurements based on optical transition radiation (OTR) provide an interesting opportunity for analyzing the transverse beam profile due to the fast time response and very good linearity of the signal with respect to the beam intensity. On the other hand, the dynamic range of typical acquisition systems as they are used in the CLIC test facility (CTF3) is typically limited and must be improved before these systems can be applied to halo measurements. One possibility for high dynamic range measurements is an innovative camera system based on charge injection device (CID) technology. With possible future measureme...

  20. Manually operated small envelope scanner system

    Energy Technology Data Exchange (ETDEWEB)

    Sword, Charles Keith

    2017-04-18

    A scanner system and method for acquisition of position-based ultrasonic inspection data are described. The scanner system includes an inspection probe and a first non-contact linear encoder having a first sensor and a first scale to track inspection probe position. The first sensor is positioned to maintain a continuous non-contact interface between the first sensor and the first scale and to maintain a continuous alignment of the first sensor with the inspection probe. The scanner system may be used to acquire two-dimensional inspection probe position data by including a second non-contact linear encoder having a second sensor and a second scale, the second sensor positioned to maintain a continuous non-contact interface between the second sensor and the second scale and to maintain a continuous alignment of the second sensor with the first sensor.

  1. The ground operations system for DFS and TV-SAT of DBP TELEKOM

    Science.gov (United States)

    Strasser, Juergen

    1990-11-01

    The design requirements and components of the Deutsche Bundespost ground-operation system responsible for monitoring and control of the national telecommunications satellite DFS and the direct-broadcast satellite TV-SAT are reviewed. The main tasks of the ground-operation system are outlined, along with its subsystems and their functions. Focus is placed on telemetry, tracking, and command (TTC) antennas, baseband equipment, the station computer system, and control room. It is noted that the ground-operation system is designed for Ku-band operation only, and that, for the period of time from satellite separation from the launch vehicle to the on-station phase, TTC functions are performed in the S-band. The operational concept adopted by the Deutsche Bundespost is also covered.

  2. PV Charging System for Remote Area Operations

    Energy Technology Data Exchange (ETDEWEB)

    Ilsemann, Frederick [Coherent Systems International, Doylestown, PA (United States); Thompson, Roger [Coherent Systems International, Doylestown, PA (United States)

    2008-07-31

    The objective of this project is to provide the public with a study of new as well existing technology to recharge batteries used in the field. A new product(s) will also be built based upon the information ascertained. American Electric Vehicles, Inc. (AEV) developed systems and methods suitable for charging state-of-the-art lithium-ion batteries in remote locations under both ideal and cloudy weather conditions. Conceptual designs are described for existing and next generation technology, particularly as regards solar cells, peak power trackers and batteries. Prototype system tests are reported.

  3. Development of the operator training system using computer graphics. Pt. 2. Operator behavior CG system and its applications

    International Nuclear Information System (INIS)

    Sasou, Kunihide; Ebisu, Mitsuhiro; Takano, Kenichi; Watabe, Kazuyuki

    2003-01-01

    In training, it has been important to show good performance of operators dealing with abnormal operating; condition simulated by a training simulator. Video-taping of the scenario-based performance by instructors of a training center is the most common way. However, it is difficult for the experienced instructors to show good performance due to the stress of being video-taped. Therefore, the authors developed a system named Operator Behavior Computer Graphic System (OBCGS) to computer-graphically show the behavior of operators. The input data of this system are data on operation, watching, walking and utterances with time, objects of operation and watching, contents of their behavior, etc. The system temporally uses the output data of Man Machine Simulator developed by CRIEPI. OBCGS has 3 kinds of user interfaces. The first one computer-graphically shows 3 operators and one shift supervisor behaving in the control room from a bird's eye viewpoint. The second one has multi windows to show details of computer graphics of operators and control panels. The last one shows the history of operations, warnings and utterance. The system shows reasonable computer graphics in quality from the viewpoint of showing good performance of operations. This report also describes how to use the OBCGS and ways of application to the operator training. (author)

  4. Building reactor operator sustain expert system with C language integrated production system

    International Nuclear Information System (INIS)

    Ouyang Qin; Hu Shouyin; Wang Ruipian

    2002-01-01

    The development of the reactor operator sustain expert system is introduced, the capability of building reactor operator sustain expert system is discussed with C Language Integrated Production System (Clips), and a simple antitype of expert system is illustrated. The limitation of building reactor operator sustain expert system with Clips is also discussed

  5. Frequency Control for Island Operation of Bornholm Power System

    DEFF Research Database (Denmark)

    Cha, Seung-Tae; Wu, Qiuwei; Zhao, Haoran

    2014-01-01

    This paper presents a coordinated control strategy of a battery energy storage system (BESS) and distributed generation (DG) units for the island operation of the Danish island of Bornholm. The Bornholm power system is able to transit from the grid connected operation with the Nordic power system...... the primary frequency control and the DG units are used to provide the secondary frequency control. As such, the proposed control scheme can strike a balance of the frequency control speed and the energy used from the BESS for the frequency control support. The real-time model of the Bornholm power system...... to the isolated island operation. In order to ensure the secure island operation, the coordinated control of the BESS and the DG has been proposed to stabilize the frequency of the system after the transition to the island operation. In the proposed coordinate control scheme, the BESS is used to provide...

  6. Reliability Issues in Distributed Operating Systems

    NARCIS (Netherlands)

    Tanenbaum, A.S.; van Renesse, R.

    1987-01-01

    The authors examine the various kinds of distributed systems and discuss some of the reliability issues involved. They first concentrate on the causes of unreliability, illustrating these with some general solutions and examples. Among the issues treated are interprocess communication, machine

  7. Post-operative cranial pressure monitoring system

    Science.gov (United States)

    Fager, C. A., Jr.; Long, L. E.; Trent, R. L.

    1970-01-01

    System for monitoring of fluidic pressures in cranial cavity uses a miniaturized pressure sensing transducer, combined with suitable amplification means, a meter with scale calibrated in terms of pressures between minus 100 and plus 900 millimeters of water, and a miniaturized chart recorder covering similar range of pressures.

  8. Space System Applications to Tactical Operations.

    Science.gov (United States)

    1984-10-01

    capacity. T ho PAYLOAD consists of two mayor structural elements as shown on the sketch on the nextpae Payload Electronic Module (PEM) in which, on four...on the second Shuttle test flight (STS-2) in November IQ8 I Nwith the antenna depresion angle fixed at 430 . In this configuration, the radar system

  9. Real-Time Operating System/360

    Science.gov (United States)

    Hoffman, R. L.; Kopp, R. S.; Mueller, H. H.; Pollan, W. D.; Van Sant, B. W.; Weiler, P. W.

    1969-01-01

    RTOS has a cost savings advantage for real-time applications, such as those with random inputs requiring a flexible data routing facility, display systems simplified by a device independent interface language, and complex applications needing added storage protection and data queuing.

  10. A program to enhance nursing managers' capability of operating computerized processing system.

    Science.gov (United States)

    Lin, Hui-Min; Han, Chiu-Ping; Fang, Hui-Mei; Lee, Kuei-Yin; Lin, Mei-Pei

    2006-01-01

    The purpose of this program is to improve the capacities of head nurses of operating hospital information system, relevant operation of the Intranet, electronic forms, and computerized processing system through nursing information educational courses and hands-on operation. The results of questionnaires show that head nurses score averagely 4.05 on the knowledge of computerized processing system in the hospital and 3.6, the lowest, on those of schedule arrangement of nursing personnel, cashier, and accounting operation. In addition, the knowledge of the Intranet operation scored averagely 4.28 and 3.8 on the operation of electronic forms and equipment maintenance and repairing request. After collecting, analyzing, compiling information and comparing to literature review, the researchers conclude the solutions as: (1) conducting nursing information training courses to improve knowledge of head nurses on relevant computerized processing system; (2) monitoring and evaluating nursing administration to promote heads-on evaluation operation for furthering understanding of individual operation problem. After the implementation of above proposed program, head nurses score 4.99 on the knowledge of hospital information and operation of relevant intranet system and demonstrate 88% of satisfaction level indicating the importance of conducting nursing information training courses to effectively improve computer operation capacity, work efficiency, and satisfaction level.

  11. An Intelligent Multiagent System for Autonomous Microgrid Operation

    Directory of Open Access Journals (Sweden)

    Tetsuo Kinoshita

    2012-09-01

    Full Text Available A microgrid is an eco-friendly power system because renewable sources such as solar and wind power are used as the main power sources. For this reason, much research, development, and demonstration projects have recently taken place in many countries. Operation is one of the important research topics for microgrids. For efficient and economical microgrid operation, a human operator is required as in other power systems, but it is difficult because there are some restrictions related to operation costs and privacy issues. To overcome the restriction, autonomous operation for microgrids is required. Recently, an intelligent agent system for autonomous microgrid operation has been studied as a potential solution. This paper proposes a multiagent system for autonomous microgrid operation. To build the multiagent system, the functionalities of agents, interactions among agents, and an effective agent protocol have been designed. The proposed system has been implemented by using an ADIPS/DASH framework as an agent platform. The intelligent multiagent system for microgrid operation based on the proposed scheme is tested to show the functionality and feasibility on a distributed environment through the Internet.

  12. An abnormal event advisory expert system prototype for reactor operators

    International Nuclear Information System (INIS)

    Hance, D.C.

    1989-01-01

    Nuclear plant operators must respond correctly during abnormal conditions in the presence of dynamic and potentially overwhelming volumes of information. For this reason, considerable effort has been directed toward the development of nuclear plant operator aids using artificial intelligence techniques. The objective of such systems is to diagnose abnormal conditions within the plant, possibly predict consequences, and advise the operators of corrective actions in a timely manner. The objective of the work is the development of a prototype expert system to diagnose abnormal events at a nuclear power plant and advise plant operators of the event and applicable procedures in an on-line mode. The major difference between this effort and previous work is the use of plant operating procedures as a knowledge source and as an integral part of the advice provided by the expert system. The acceptance by utilities of expert systems as operator aids requires that such systems be compatible with the regulatory environment and provide economic benefits. For this reason, commercially viable operator aid systems developed in the near future must complement existing plant procedures rather than reach beyond them in a revolutionary manner. A knowledge source is the resource providing facts and relationships that are coded into the expert system program. In this case, the primary source of knowledge is a set of selected abnormal operating procedures for a modern Westinghouse pressurized water reactor

  13. Development of a Comprehensive Mission Operations System Designed to Operate Multiple Small Satellites

    OpenAIRE

    Sorensen, Trevor; Pilger, Eric; Wood, Mark; Nunes, Miguel; Yost, Bruce

    2011-01-01

    The Hawaii Space Flight Laboratory (HSFL) at the University of Hawaii at Manoa, in collaboration with NASA Ames Research Center (ARC), is developing COSMOS (Comprehensive Open-architecture Space Mission Operations System), a set of software tools and hardware that is designed to primarily support the development and operations of one or more small spacecraft. COSMOS will be particularly suited for organizations with limited development and operations budget, such as universities. COSMOS is a ...

  14. A review on the sustainability of constructed wetlands for wastewater treatment: Design and operation.

    Science.gov (United States)

    Wu, Haiming; Zhang, Jian; Ngo, Huu Hao; Guo, Wenshan; Hu, Zhen; Liang, Shuang; Fan, Jinlin; Liu, Hai

    2015-01-01

    Constructed wetlands (CWs) have been used as a green technology to treat various wastewaters for several decades. CWs offer a land-intensive, low-energy, and less-operational-requirements alternative to conventional treatment systems, especially for small communities and remote locations. However, the sustainable operation and successful application of these systems remains a challenge. Hence, this paper aims to provide and inspire sustainable solutions for the performance and application of CWs by giving a comprehensive review of CWs' application and the recent development on their sustainable design and operation for wastewater treatment. Firstly, a brief summary on the definition, classification and application of current CWs was presented. The design parameters and operational conditions of CWs including plant species, substrate types, water depth, hydraulic load, hydraulic retention time and feeding mode related to the sustainable operation for wastewater treatments were then discussed. Lastly, future research on improving the stability and sustainability of CWs were highlighted. Copyright © 2014 Elsevier Ltd. All rights reserved.

  15. Regolith Advanced Surface Systems Operations Robot (RASSOR)

    Science.gov (United States)

    Mueller, Robert P.; Smith, Jonathan D.; Cox, Rachel E.; Schuler, Jason M.; Ebert, Tom; Nick, Andrew J.

    2012-01-01

    Regolith is abundant on extra-terrestrial surfaces and is the source of many resources such as oxygen, hydrogen, titanium, aluminum, iron, silica and other valuable materials, which can be used to make rocket propellant, consumables for life support, radiation protection barrier shields, landing pads, blast protection berms, roads, habitats and other structures and devices. Recent data from the Moon also indicates that there are substantial deposits of water ice in permanently shadowed crater regions and possibly under an over burden of regolith. The key to being able to use this regolith and acquire the resources, is being able to manipulate it with robotic excavation and hauling machinery that can survive and operate in these very extreme extra-terrestrial surface environments. In addition, the reduced gravity on the Moon, Mars, comets and asteroids poses a significant challenge in that the necessary reaction force for digging cannot be provided by the robot's weight as is typically done on Earth. Space transportation is expensive and limited in capacity, so small, lightweight payloads are desirable, which means large traditional excavation machines are not a viable option. A novel, compact and lightweight excavation robot prototype for manipulating, excavating, acquiring, hauling and dumping regolith on extra-terrestrial surfaces has been developed and tested. Lessons learned and test results will be presented including digging in a variety of lunar regolith simulant conditions including frozen regolith mixed with water ice.

  16. Application of reliability worth concepts in power system operational planning

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J.C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Silva, A.M. Leite da [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Pereira, M.V.F. [Power System Research (PSR), Inc., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This work describes the application of a new methodology for calculating total system interruption costs in power system operational planning. Some important operational aspects are discussed: chronological load curves, customer damage functions for each consumer class, maintenance scheduling and non-exponential repair times. It is also presented the calculation of the probability distribution of the system interruption cost to improve the decision making process associated with alternative operational strategies. The Brazilian Southeastern system is used to illustrate all previous applications. (author) 24 refs., 8 figs., 4 tabs.

  17. The wireless diagnostic system for motor operated valves

    International Nuclear Information System (INIS)

    Ito, Haruo; Akiyama, Michiaki; Suzuki, Syunichi

    2010-01-01

    To aim at maintenance optimization, a motor operated valve (MOV) diagnostic system called 'MOVDAS' has been developed by using new sensor technologies incorporating torque sensor into the MOV. It has been introduced into nuclear power plants operated by Japan Atomic Power Company (JAPC) for the support of Condition Based Maintenance (CBM). This system, directly checking the torque behavior of the MOV, accurately diagnoses the condition of the MOV during plant operation. Further for the ease of data collection and manpower saving, the wireless diagnostic system based on MOVDAS utilizing Personal Handyphone System (PHS) has been recently introduced into nuclear power plants in JAPC. (author)

  18. Mission Operations and Data Systems Directorate's operational/development network (MODNET) at Goddard Space Flight Center

    Science.gov (United States)

    1988-01-01

    A brief, informal narrative is provided that summarizes the results of all work accomplished during the period of the contract; June 1, 1987 through September 30, 1988; in support of Mission Operations and Data Systems Directorate's Operational Development Network (MODNET). It includes descriptions of work performed in each functional area and recommendations and conclusions based on the experience and results obtained.

  19. Modules program structures and the structuring of operating systems

    NARCIS (Netherlands)

    Bron, C.; Duijvestijn, W.; Lockemann, P.C.

    1981-01-01

    In this paper some views are presented on the way in which complex systems, such as Operating Systems and the programs to be interfaced with them can be constructed, and how such systems may become heavily library oriented. Although such systems have a dynamic nature, all interfacing within and

  20. A Framework for Adaptable Operating and Runtime Systems

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, Thomas [Indiana Univ., Bloomington, IN (United States)

    2014-03-04

    The emergence of new classes of HPC systems where performance improvement is enabled by Moore’s Law for technology is manifest through multi-core-based architectures including specialized GPU structures. Operating systems were originally designed for control of uniprocessor systems. By the 1980s multiprogramming, virtual memory, and network interconnection were integral services incorporated as part of most modern computers. HPC operating systems were primarily derivatives of the Unix model with Linux dominating the Top-500 list. The use of Linux for commodity clusters was first pioneered by the NASA Beowulf Project. However, the rapid increase in number of cores to achieve performance gain through technology advances has exposed the limitations of POSIX general-purpose operating systems in scaling and efficiency. This project was undertaken through the leadership of Sandia National Laboratories and in partnership of the University of New Mexico to investigate the alternative of composable lightweight kernels on scalable HPC architectures to achieve superior performance for a wide range of applications. The use of composable operating systems is intended to provide a minimalist set of services specifically required by a given application to preclude overheads and operational uncertainties (“OS noise”) that have been demonstrated to degrade efficiency and operational consistency. This project was undertaken as an exploration to investigate possible strategies and methods for composable lightweight kernel operating systems towards support for extreme scale systems.