WorldWideScience

Sample records for system operation review

  1. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  2. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  3. Fire protection system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1995-12-01

    This report presents a review of fire protection system operating experiences from particle accelerator, fusion experiment, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of fire protection system component failure rates and fire accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with these systems are discussed, including spurious operation. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor

  4. Fire protection system operating experience review for fusion applications

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, L.C.

    1995-12-01

    This report presents a review of fire protection system operating experiences from particle accelerator, fusion experiment, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of fire protection system component failure rates and fire accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with these systems are discussed, including spurious operation. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor.

  5. Columbia River System Operation Review final environmental impact statement. Appendix A: River Operation Simulation (ROSE)

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The River Operation Simulation Experts (ROSE) work group is comprised of representatives of the Corps, BPA, Reclamation, NMFS, Pacific Northwest Utilities Conference Committee (PNUCC), and Northwest Power Planning Council (NPPC). ROSE was responsible for using computer hydroregulation models to simulate the operation of the river system for all of the alternatives evaluated in screening and full scale analysis in SOR. These models are complex computer programs which sequentially route streamflows through each dam in the system, calculating the streamflows, reservoir elevations, spill, power generation and other information at each project and pertinent locations on the river system. ROSE first reviewed specifications of proposed alternatives to determine whether such alternatives were formulated adequately to be run on hydroregulation models

  6. Ventilation Systems Operating Experience Review for Fusion Applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1999-01-01

    This report is a collection and review of system operation and failure experiences for air ventilation systems in nuclear facilities. These experiences are applicable for magnetic and inertial fusion facilities since air ventilation systems are support systems that can be considered generic to nuclear facilities. The report contains descriptions of ventilation system components, operating experiences with these systems, component failure rates, and component repair times. Since ventilation systems have a role in mitigating accident releases in nuclear facilities, these data are useful in safety analysis and risk assessment of public safety. An effort has also been given to identifying any safety issues with personnel operating or maintaining ventilation systems. Finally, the recommended failure data were compared to an independent data set to determine the accuracy of individual values. This comparison is useful for the International Energy Agency task on fusion component failure rate data collection

  7. Operational Readiness Review Final Report for K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    An Operational Readiness Review (ORR) was conducted by the U.S. Department of Energy (DOE), Richland Operations Office (RL) to verify that an adequate state of readiness had been achieved for startup of the K Basin Fuel Transfer System (FTS). The DOE ORR was conducted during the period November 6-18, 2002. The DOE ORR team concluded that the K Basin Fuel Transfer System is ready to start operations, subject to completion and verification of identified pre-start findings. The ORR was conducted in accordance with the Spent Nuclear Fuel (SNF) K Basin Fuel Transfer System (FTS) Operational Readiness Review (ORR) Plan of Action and the Operational Readiness Review Implementation Plan for K Basin Fuel Transfer System. Review activities consisted of staff interviews, procedure and document reviews, and observations of normal facility operations, operational upset conditions, and an emergency drill. The DOE ORR Team also reviewed and assessed the adequacy of the contractor ORR3 and the RL line management review. The team concurred with the findings and observations identified in these two reports. The DOE ORR for the FTS evaluated the contractor under single-shift operations. Of concern to the ORR Team was that SNF Project management intended to change from a single-shift FTS operation to a two-shift operation shortly after the completion of the DOE ORR. The ORR team did not assess two-shift FTS operations and the ability of the contractor to conduct a smooth transition from shift to shift. However, the DOE ORR team did observe an operational upset drill that was conducted during day shift and carried over into swing shift; during this drill, swing shift was staffed with fewer personnel as would be expected for two-shift operations. The facility was able to adequately respond to the event with the reduced level of staff. The ORR Team was also able to observe a Shift Manager turnover meeting when one shift manager had to be relieved during the middle of the day. The ORR

  8. Cryogenic system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1992-01-01

    This report presents a review of cryogenic system operating experiences, from particle accelerator, fusion experiment, space research, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of cryogenic component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with cryogenic systems are discussed, including ozone formation, effects of spills, and modeling spill behavior. This information should be useful to fusion system designers and safety analysts, such as the team working on the International Thermonuclear Experimental Reactor design

  9. Vacuum system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1994-03-01

    This report presents a review of vacuum system operating experiences from particle accelerator, fusion experiment, space simulation chamber, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of vacuum system component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with vacuum systems are discussed, including personnel safety, foreign material intrusion, and factors relevant to vacuum systems being the primary confinement boundary for tritium and activated dusts. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor

  10. Operating System Concepts for Reconfigurable Computing: Review and Survey

    OpenAIRE

    Marcel Eckert; Dominik Meyer; Jan Haase; Bernd Klauer

    2016-01-01

    One of the key future challenges for reconfigurable computing is to enable higher design productivity and a more easy way to use reconfigurable computing systems for users that are unfamiliar with the underlying concepts. One way of doing this is to provide standardization and abstraction, usually supported and enforced by an operating system. This article gives historical review and a summary on ideas and key concepts to include reconfigurable computing aspects in operating systems. The arti...

  11. Operating System Concepts for Reconfigurable Computing: Review and Survey

    Directory of Open Access Journals (Sweden)

    Marcel Eckert

    2016-01-01

    Full Text Available One of the key future challenges for reconfigurable computing is to enable higher design productivity and a more easy way to use reconfigurable computing systems for users that are unfamiliar with the underlying concepts. One way of doing this is to provide standardization and abstraction, usually supported and enforced by an operating system. This article gives historical review and a summary on ideas and key concepts to include reconfigurable computing aspects in operating systems. The article also presents an overview on published and available operating systems targeting the area of reconfigurable computing. The purpose of this article is to identify and summarize common patterns among those systems that can be seen as de facto standard. Furthermore, open problems, not covered by these already available systems, are identified.

  12. Columbia River System Operation Review final environmental impact statement. Appendix T: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix documents the public and agency review of the SOR Draft EIS and how the SOR agencies used the review to formulate the FINAL EIS. The appendix includes a summary of the review process, a discussion of the nature of the comments, a list of all commentors, reproductions of comment letters, and responses to all comments. Changes in the EIS text in response to comments are noted in the responses

  13. Review on Islanding Operation of Distribution System with Distributed Generation

    DEFF Research Database (Denmark)

    Mahat, Pukar; Chen, Zhe; Bak-Jensen, Birgitte

    2011-01-01

    The growing environmental concern and various benefits of distributed generation (DG) have resulted in significant penetration of DG in many distribution systems worldwide. One of the major expected benefits of DG is the improvement in the reliability of power supply by supplying load during power...... outage by operating in an island mode. However, there are many challenges to overcome before islanding operation of a distribution system with DG can become a viable solution in future. This paper reviews some of the major challenges with islanding operation and explores some possible solutions...

  14. Stochastic Methods Applied to Power System Operations with Renewable Energy: A Review

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Z. [Argonne National Lab. (ANL), Argonne, IL (United States); Liu, C. [Argonne National Lab. (ANL), Argonne, IL (United States); Electric Reliability Council of Texas (ERCOT), Austin, TX (United States); Botterud, A. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    Renewable energy resources have been rapidly integrated into power systems in many parts of the world, contributing to a cleaner and more sustainable supply of electricity. Wind and solar resources also introduce new challenges for system operations and planning in terms of economics and reliability because of their variability and uncertainty. Operational strategies based on stochastic optimization have been developed recently to address these challenges. In general terms, these stochastic strategies either embed uncertainties into the scheduling formulations (e.g., the unit commitment [UC] problem) in probabilistic forms or develop more appropriate operating reserve strategies to take advantage of advanced forecasting techniques. Other approaches to address uncertainty are also proposed, where operational feasibility is ensured within an uncertainty set of forecasting intervals. In this report, a comprehensive review is conducted to present the state of the art through Spring 2015 in the area of stochastic methods applied to power system operations with high penetration of renewable energy. Chapters 1 and 2 give a brief introduction and overview of power system and electricity market operations, as well as the impact of renewable energy and how this impact is typically considered in modeling tools. Chapter 3 reviews relevant literature on operating reserves and specifically probabilistic methods to estimate the need for system reserve requirements. Chapter 4 looks at stochastic programming formulations of the UC and economic dispatch (ED) problems, highlighting benefits reported in the literature as well as recent industry developments. Chapter 5 briefly introduces alternative formulations of UC under uncertainty, such as robust, chance-constrained, and interval programming. Finally, in Chapter 6, we conclude with the main observations from our review and important directions for future work.

  15. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930's, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D'Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation

  16. Columbia River System Operation Review final environmental impact statement. Appendix L: Soils, geology and groundwater

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix addresses the study of geology, soils, and groundwater concerns relative to the System Operation Review (SOR). Chapter 1 provides an overview of the study, scope, and process for this resource area. In order, the respective sections of this chapter discuss the relevant issues for the study, and the means by which the SOR team carried out the study

  17. Columbia River System Operation Review final environmental impact statement. Appendix G: Land use and development

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. The SOR began in early 1990, prior to the filing of petitions for endangered status for several salmon species under the Endangered Species Act. The comprehensive review of Columbia River operations encompassed by the SOR was prompted by the need for Federal decisions to (1) develop a coordinated system operating strategy (SOS) for managing the multiple uses of the system into the 21st century; (2) provide interested parties with a continuing and increased long-term role in system planning (Columbia River Regional Forum); (3) renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA), a contractual arrangement among the region's major hydroelectric-generating utilities and affected Federal agencies to provide for coordinated power generation on the Columbia River system; and (4) renew or develop new Canadian Entitlement Allocation Agreements. The review provides the environmental analysis required by the National Environmental Policy Act (NEPA). This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR

  18. Operational readiness review implementation plan for K Basin sludge water system

    International Nuclear Information System (INIS)

    IRWIN, R.M.

    2003-01-01

    This Implementation Plan (IP) has been prepared consistent with the requirements of U.S. Department of Energy (DOE) Order 425.1B, ''Startup and Restart of Nuclear Facilities'', and DOE-STD-3006-2000, ''Planning and Conduct of Operational Readiness Reviews'' (ORR) (DOE 2002). The scope of the DOE ORR is described in the RL ''Plan of Action, K Basin Sludge Water System'' (Veitenheimer 2003), prepared by DOE project line management and approved by the RL Manager, the designated Approval Authority, on March 20, 2003. The scope of the contractor ORR is described in the contractor ''Plan of Action for the K Basins Sludge Water System Operational Readiness Review'' (FH 2002a) which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on December 19, 2002. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated February 5, 2003 (Roberson 2003). This IP provides the overall approach and guidelines for performance of the DOE ORR. Appendix A contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  19. Columbia River System Operation Review final environmental impact statement. Appendix P: Canadian Entitlement Allocation Agreements (CEAA)

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The purpose of this technical appendix is to provide the environmental review necessary to enter into agreements regarding the distribution between Federal and non-Federal project owners with respect to delivery of the Canadian Entitlement obligation to Canada for the period 1998 through 2024

  20. Energy and water quality management systems for water utility's operations: a review.

    Science.gov (United States)

    Cherchi, Carla; Badruzzaman, Mohammad; Oppenheimer, Joan; Bros, Christopher M; Jacangelo, Joseph G

    2015-04-15

    Holistic management of water and energy resources is critical for water utilities facing increasing energy prices, water supply shortage and stringent regulatory requirements. In the early 1990s, the concept of an integrated Energy and Water Quality Management System (EWQMS) was developed as an operational optimization framework for solving water quality, water supply and energy management problems simultaneously. Approximately twenty water utilities have implemented an EWQMS by interfacing commercial or in-house software optimization programs with existing control systems. For utilities with an installed EWQMS, operating cost savings of 8-15% have been reported due to higher use of cheaper tariff periods and better operating efficiencies, resulting in the reduction in energy consumption of ∼6-9%. This review provides the current state-of-knowledge on EWQMS typical structural features and operational strategies and benefits and drawbacks are analyzed. The review also highlights the challenges encountered during installation and implementation of EWQMS and identifies the knowledge gaps that should motivate new research efforts. Copyright © 2015 Elsevier Ltd. All rights reserved.

  1. Columbia River System Operation Review final environmental impact statement. Appendix Q: Regional forum

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The SOR is currently developing a System Operating Strategy (SOS) that will guide the physical operations of the Columbia River system. The SOR is also addressing the institutional arrangements that must be in place to make needed changes to the SOS in the future, or make interpretations of the strategy in the light of changing water conditions or river needs. For convenience, this future institutional arrangement is referred to as ''The Columbia River Regional Forum,'' or simply ''the Forum,'' even though the nature of this institution is still to be determined. This appendix and the Final Environmental Impact Statement (EIS) identify the Forum as an administrative process that will not result in impacts to the environment and will not require analysis in a NEPA context. The composition of and procedures followed by a decision making body cannot--in and of themselves--be used to predict a particular decision with definable impacts on the environment. Nevertheless, because of the relationship to the other SOR actions, the SOR lead agencies have prepared this Technical Appendix to provide opportunities for review and comment on the Forum alternatives

  2. 75 FR 49943 - New Agency Information Collection Activity Under OMB Review: Pipeline System Operator Security...

    Science.gov (United States)

    2010-08-16

    ... INFORMATION CONTACT: Joanna Johnson, Office of Information Technology, TSA-11, Transportation Security... Collection Activity Under OMB Review: Pipeline System Operator Security Information AGENCY: Transportation... System Operator Security Information. Type of Request: New collection. OMB Control Number: Not yet...

  3. Columbia River System Operation Review final environmental impact statement. Appendix I: Power

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix discusses the work performed by the SOR Power Work Group. The Power Work Group (PWG) had several major responsibilities: first, to determine the effects of each of the various system operating strategies (SOS) on the Northwest regional power system; second, given these effects, to determine what, if any, actions are required to meet forecasted regional energy consumption; and finally, to estimate the cost for serving the forecasted regional energy consumption. The Northwest regional power system consists of Federal and non-Federal hydroelectric power projects (hydropower or hydro projects) on the main stem of the Columbia and Snake Rivers, numerous smaller hydro projects on other river reaches, and a number of thermal plants (coal, nuclear and combustion turbines)

  4. Columbia River System Operation Review final environmental impact statement. Appendix M: Water quality

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. Analysis of water quality begins with an account of the planning and evaluation process, and continues with a description of existing water quality conditions in the Columbia River Basin. This is followed by an explanation how the analysis was conducted. The analysis concludes with an assessment of the effects of SOR alternatives on water quality and a comparison of alternatives

  5. Review of trends in computerized systems for operator support

    International Nuclear Information System (INIS)

    Cain, D.G.

    1985-01-01

    The major trends shaping the development of computerized operator support systems in nuclear power plants are reviewed. These trends are the result of prior research in disturbance analysis systems that provided the technology base, and the SPDS requirement, which has been the impetus for change. The process is expected to result in hybrid control rooms with computer-driven supervisory workstations that complement conventional control board lay-outs. In the next three to five year period substantial upgrading of computer hardware will allow new and more sophisticated applications routines to be developed for operator support. Greater attention is being given to on-line validation of input signals for computer applications. A general movement towards operating strategies that are not based upon pre-analyzed event sequences is expected to influence the development of operator aids. The integration of displays with operating procedures will enable the computer system to a better coupling between problem detection and its resolution. Improved design methodology will assure that computer applications are accepted and used by operations personnel. Greater on-line analysis capability is stimulating the trend towards more on-site analysis and decision-making at nuclear power plants. Software standardization reflects the high cost of software development and the desire by utilities to gain greater independence from suppliers. There is growing realization that control rooms are beset by many of the demands and limitations of other office settings and that some of these may be addressed by the burgeoning office automation technology. Trends beyond the next five years are difficult to predict; however, there will be a trend towards more intelligent software. Artificial intelligence technology may play a pivotal role in future applications. Taking these trends into perspective, the author concludes that a promising future exists for computerized operator support in nuclear

  6. Criteria for operator review of workplace changes

    International Nuclear Information System (INIS)

    Davey, E.

    2000-01-01

    A set of criteria for reviewing workplace changes has been developed for use by plant Operations staff. The criteria were developed to provide Operations staff with a practical framework for structuring assessments and subsequent review comments with regard to control room modifications and innovations that impact their work environment. The criteria were assembled from design, operations and human factors engineering principles, and system review experiences with plant Operations staff over the past ten years. Operations staff at several CANDU stations helped shape the emphasis for initial criteria definition and have assisted with criteria refinement through trial applications. Use of the criteria is expected to lead to more effective and task relevant equipment evaluations by Operations staff, and ultimately lead to system modifications and innovations that better serve plant operation needs. The paper begins with a discussion of the rationale for criteria development and the attributes of 'good' design. The balance of the paper outlines the project objectives, describes the approach applied in assembling, structuring, and refining the review criteria, and illustrates the application of the criteria in the review of a proposed control room innovation. (author)

  7. Columbia River System Operation Review final environmental impact statement. Appendix E: Flood control

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The Corps of Engineers, Bonneville Power Administration, and Bureau of Reclamation conducted a scoping process consisting of a series of regionwide public meetings and solicitation of written comments in the summer of 1990. Comments on flood control issues were received from all parts of the Columbia river basin. This appendix includes issues raised in the public scoping process, as well as those brought for consideration by members of the Flood Control Work Group

  8. Columbia River system operation review: Final environmental impact statement. Main report

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement

  9. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.); United States. Bonneville Power Administration; United States. Army. Corps of Engineers. North Pacific Division; United States. Bureau of Reclamation. Pacific Northwest Region.

    1995-11-01

    The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement.

  10. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report Exhibits.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Volume is a part of the Final Environmental Impact Statement (EIS) for the Columbia River System. This volume contains technical exhibits of cultural resources and commentary on the (System Operation Review) SOR process. The Confederated Tribes of the Umatilla Indian Reservation comment is the majority of the material in the volume, in the Consultation Plan, Identification of trust resources; Criteria for the selection of a System Operating Strategy; comment on rights protection and implementation of Federal Trust responsibility; analysis of the draft EIS. Comment by other Native American Tribes and groups is also included: Confederated Tribes of the Colville Reservation; Kootenai Tribe of Idaho; Spokane Tribe of Indians; Coeur d` Alene tribe.

  11. Columbia River system operation review: Final environmental impact statement. Main report exhibits

    International Nuclear Information System (INIS)

    1995-11-01

    This Volume is a part of the Final Environmental Impact Statement (EIS) for the Columbia River System. This volume contains technical exhibits of cultural resources and commentary on the (System Operation Review) SOR process. The Confederated Tribes of the Umatilla Indian Reservation comment is the majority of the material in the volume, in the Consultation Plan, Identification of trust resources; Criteria for the selection of a System Operating Strategy; comment on rights protection and implementation of Federal Trust responsibility; analysis of the draft EIS. Comment by other Native American Tribes and groups is also included: Confederated Tribes of the Colville Reservation; Kootenai Tribe of Idaho; Spokane Tribe of Indians; Coeur d' Alene tribe

  12. Columbia River System Operation Review final environmental impact statement. Appendix K: Resident fish

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. In this appendix the Resident Fish Work Group (RFWG) has attempted to characterize and evaluate impacts of dam operation on an extremely complex and diverse integrated resource. Not only is this required under the National Environmental Policy Act (NEPA) for SOR, there are resident fish populations that have status under the Federal Endangered Species Act (ESA) or equivalent state regulations (Kootenai River white sturgeon, Snake River white sturgeon, sandroller, shorthead and torrent sculpins, bull trout, westslope cutthroat trout, redband trout, and burbot). The RFWG has also attempted to develop operating alternatives that benefit not only resident fish, but anadromous fish, wildlife, and other human interests as well. The authors have recognized the co-evolution of resident fish, anadromous fish, and other integrated resources in the basin

  13. Review of Ground Systems Development and Operations (GSDO) Tools for Verifying Command and Control Software

    Science.gov (United States)

    Aguilar, Michael L.; Bonanne, Kevin H.; Favretto, Jeffrey A.; Jackson, Maddalena M.; Jones, Stephanie L.; Mackey, Ryan M.; Sarrel, Marc A.; Simpson, Kimberly A.

    2014-01-01

    The Exploration Systems Development (ESD) Standing Review Board (SRB) requested the NASA Engineering and Safety Center (NESC) conduct an independent review of the plan developed by Ground Systems Development and Operations (GSDO) for identifying models and emulators to create a tool(s) to verify their command and control software. The NESC was requested to identify any issues or weaknesses in the GSDO plan. This document contains the outcome of the NESC review.

  14. Columbia River System Operation Review final environmental impact statement. Appendix H: Navigation

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The Navigation Technical Appendix presents the analysis of the various SOR alternatives in terms of their potential affects on the congressionally authorized navigation system within the Columbia and Snake river waterways. The focus of the study, impacts to the authorized navigation, improvements/developments, reflects on one of the continuing historical missions of the US Army Corps of Engineers: to promote safe commercial navigation of the nation's waterways benefiting the development of commerce within the US. The study and evaluation process involved Scoping, Screening and Full Scale Evaluation. During screening two models were developed; one was used to evaluate the effects of the various alternatives on navigation through the Snake River Projects and the other the effects on the Dworshak Pool. Full Scale Analysis was expanded to included a study of effects throughout the system

  15. Improving the review of standard operating procedures: a novel electronic system for compounding pharmacies.

    Science.gov (United States)

    Brensel, Robert; Brensel, Scott; Ng, Amy

    2013-01-01

    Since the New England Compounding Center disaster in 2012, the importance of following correct procedures during every phase of customized pharmacy has been a focus of governmental interest and action as well as public scrutiny. Many pharmacies rely on the rote review of standard operating procedures to ensure that staff members understand and follow protocols that ensure the safety and potency of all compounds prepared, but that approach to continuing education can be cumbersome and needlessly time-consuming. In addition, documenting and retrieving evidence of employee competence can be difficult. In this article, we describe our use of online technology to improve our methods of educating staff about the full range of standard operating procedures that must be followed in our pharmacy. The system we devised and implemented has proven to be effective, easy to update and maintain, very inexpensive, and user friendly. Its use has reduced the time previously required for a read-over review of standard operating procedures from 30 or 40 minutes to 5 or 10 minutes in weekly staff meetings, and we can now easily document and access proof of employees' comprehension of that content. It is our hope that other small compounding pharmacies will also find this system of online standard operating procedure review helpful.

  16. Technical Review of Operator's Destructive Analyses at the Rokkasho Reprocessing Plant: Strengthening the Transparency of the Operator's Measurement System

    International Nuclear Information System (INIS)

    Sato, N.; Katchi, T.; Niitsu, Y.; Duhamel, G.; Decaillon, J.-G.; Toervenyi, A.; Sayama, H.; Hara, S.

    2015-01-01

    The Rokkasho Reprocessing Plant is a large-scale nuclear facility in Japan. For the purposes of process control, product management and nuclear material accountancy for safeguards purposes, the laboratory of the facility operator analyzes thousands of samples from various process streams and with a multitude of matrices. Transparency of operational procedures, quality control measures and sample analytical results among the facility operator and state and international safeguards authorities are required to assess the facility operator's measurement system, and thus to assure a credible safeguards approach. The facility operator, Japan Nuclear Fuel, Limited (JNFL), is engaged in continuous improvement of its nuclear material analyzes. For the declarations to the inspectorates, it is important that JNFL and the safeguards authorities be able to confirm that the analytical methods used by JNFL are reliable and meet the latest version of the International Target Values. Since 2012 JNFL, the IAEA and the SSAC have carried out several technical reviews of the destructive analysis (DA) processes as a means of strengthening the transparency of the DA measurement systems. The goal of the DA technical reviews is to (1) assess past commitments of the JNFL plan for analytical improvement, (2) review the JNFL Quality System by means of documentation reviews and in-field demonstrations, and (3) review the analytical performance of the JNFL lab through its own results or from inter-laboratory comparison exercises. Throughout this process, subject-matter experts from all organizations met with JNFL laboratory staff and discussed analytical concerns and solutions. The outcome of these technical reviews was a series of recommendations to JNFL for strengthening its plan for continuous improvement. This paper presents the methodology of the DA technical reviews, the communication scheme and some examples of the outcome for JNFL to improve its DA methods and analytical

  17. The Effects of Degraded Digital Instrumentation and Control Systems on Human-system Interfaces and Operator Performance: HFE Review Guidance and Technical Basis

    Energy Technology Data Exchange (ETDEWEB)

    O' Hara, J.M.; W. Gunther, G. Martinez-Guridi

    2010-02-26

    New and advanced reactors will use integrated digital instrumentation and control (I&C) systems to support operators in their monitoring and control functions. Even though digital systems are typically highly reliable, their potential for degradation or failure could significantly affect operator performance and, consequently, impact plant safety. The U.S. Nuclear Regulatory Commission (NRC) supported this research project to investigate the effects of degraded I&C systems on human performance and plant operations. The objective was to develop human factors engineering (HFE) review guidance addressing the detection and management of degraded digital I&C conditions by plant operators. We reviewed pertinent standards and guidelines, empirical studies, and plant operating experience. In addition, we conducted an evaluation of the potential effects of selected failure modes of the digital feedwater system on human-system interfaces (HSIs) and operator performance. The results indicated that I&C degradations are prevalent in plants employing digital systems and the overall effects on plant behavior can be significant, such as causing a reactor trip or causing equipment to operate unexpectedly. I&C degradations can impact the HSIs used by operators to monitor and control the plant. For example, sensor degradations can make displays difficult to interpret and can sometimes mislead operators by making it appear that a process disturbance has occurred. We used the information obtained as the technical basis upon which to develop HFE review guidance. The guidance addresses the treatment of degraded I&C conditions as part of the design process and the HSI features and functions that support operators to monitor I&C performance and manage I&C degradations when they occur. In addition, we identified topics for future research.

  18. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix D: Exhibits.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930`s, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D`Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation.

  19. The Effects of Degraded Digital Instrumentation and Control Systems on Human-system Interfaces and Operator Performance: HFE Review Guidance and Technical Basis

    International Nuclear Information System (INIS)

    O'Hara, J.M.; Gunther, W.; Martinez-Guridi, G.

    2010-01-01

    New and advanced reactors will use integrated digital instrumentation and control (I and C) systems to support operators in their monitoring and control functions. Even though digital systems are typically highly reliable, their potential for degradation or failure could significantly affect operator performance and, consequently, impact plant safety. The U.S. Nuclear Regulatory Commission (NRC) supported this research project to investigate the effects of degraded I and C systems on human performance and plant operations. The objective was to develop human factors engineering (HFE) review guidance addressing the detection and management of degraded digital I and C conditions by plant operators. We reviewed pertinent standards and guidelines, empirical studies, and plant operating experience. In addition, we conducted an evaluation of the potential effects of selected failure modes of the digital feedwater system on human-system interfaces (HSIs) and operator performance. The results indicated that I and C degradations are prevalent in plants employing digital systems and the overall effects on plant behavior can be significant, such as causing a reactor trip or causing equipment to operate unexpectedly. I and C degradations can impact the HSIs used by operators to monitor and control the plant. For example, sensor degradations can make displays difficult to interpret and can sometimes mislead operators by making it appear that a process disturbance has occurred. We used the information obtained as the technical basis upon which to develop HFE review guidance. The guidance addresses the treatment of degraded I and C conditions as part of the design process and the HSI features and functions that support operators to monitor I and C performance and manage I and C degradations when they occur. In addition, we identified topics for future research.

  20. Operating experience review - Ventilation systems at Department of Energy Facilities

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Office of Special Projects (DP-35), formerly Office of Self-Assessment (DP-9), analyzed occurrences caused by problems with equipment and material and recommended the following systems for an in-depth study: (1) Selective Alpha Air Monitor (SAAM), (2) Emergency Diesel Generator, (3) Ventilation System, (4) Fire Alarm System. Further, DP-35 conducted an in-depth review of the problems associated with SAAM and with diesel generators, and made several recommendations. This study focusses on ventilation system. The intent was to determine the causes for the events related to these system that were reported in the Occurrence Reporting and Processing System (ORPS), to identify components that failed, and to provide technical information from the commercial and nuclear industries on the design, operation, maintenance, and surveillance related to the system and its components. From these data, sites can develop a comprehensive program of maintenance management, including surveillance, to avoid similar occurrences, and to be in compliance with the following DOE orders.

  1. A review of the National pharmacovigilance system in Malta - implementing and operating a pharmacovigilance management system.

    Science.gov (United States)

    Tanti, Amy; Micallef, Benjamin; Serracino-Inglott, Anthony; Borg, John-Joseph

    2017-01-01

    Regulatory authorities have a legal mandate to implement and maintain a Pharmacovigilance System designed to monitor the safety of authorised medicinal products and detect any change to their risk-benefit balance. Areas covered: This review maps the implementation of pharmacovigilance activities in Malta since accession in the EU in mid 2004 and discusses the challenges the Maltese Regulator encountered while setting up adequate and effective systems to fulfil its legal mandate. Areas reviewed are those around ADR reporting, promotion and safety communications including rapid alerts and recalls, direct healthcare professional communications, risk minimisation measures and safety circulars and quality systems. Expert opinion: Within a ten year period, 3 EU directives on pharmacovigilance were implemented by our agency. Despite limitations to resources, based on a prioritised implementation, the legislation provisions are now fully operational with a good level of sustainability. Lessons learnt from this process are discussed in this review. The coming years will involve strengthening and consolidation of existing processes.

  2. High Performance Computing Operations Review Report

    Energy Technology Data Exchange (ETDEWEB)

    Cupps, Kimberly C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-12-19

    The High Performance Computing Operations Review (HPCOR) meeting—requested by the ASC and ASCR program headquarters at DOE—was held November 5 and 6, 2013, at the Marriott Hotel in San Francisco, CA. The purpose of the review was to discuss the processes and practices for HPC integration and its related software and facilities. Experiences and lessons learned from the most recent systems deployed were covered in order to benefit the deployment of new systems.

  3. Review of decision aids for nuclear-plant operators

    International Nuclear Information System (INIS)

    Kisner, R.A.

    1983-01-01

    Responses to various computer-based operational aids varied widely in detail, thus forcing distillation of the salient features of many operational aids from information sources other than the initial questionnaire. These sources included technical and management presentations, technical papers and reports, personal discussions, taped responses, sales brochures, system specifications and schematics, and other documents. The data base is dynamic, not static, owing to the nature of current trends in operational aid development. The information contained in it is subject to review and revision by the developing organizations. More systems are pending review and entry into the data base; hence the list is incomplete

  4. Operational readiness review phase-1 final report for WRAP-1

    Energy Technology Data Exchange (ETDEWEB)

    Bowen, W., Westinghouse Hanford

    1996-12-27

    This report documents the Operational Readiness Review for WRAP-1 Phase-1 operations. The report includes all criteria, lines of inquiry with resulting Findings and Observations. The review included assessing operational capability of the organization and the computer controlled process and facility systems.

  5. The tokamak fusion test reactor tritium systems test contractor operational readiness review

    International Nuclear Information System (INIS)

    Gentile, C.A.; Levine, J.; Norris, M.; Rehill, F.; Such, C.

    1993-01-01

    In preparation for D-T operations at TFTR, the TFTR project has successfully completed the C-ORR process which has led to the introduction of 200 curies of tritium to the site. Preparations for the C-ORR began approximately 2 years ago. During July 1992 a one-week Site Assistance Review was conducted by the C-ORR , and C-ORR Team consisting of 12 persons, all of whom were outside experts, many of whom were from other facilities within the DOE complex. During the July 1992 Site Assistance Review 201 findings were documented which fell into one of three categories. All of the 109 category one findings which were generated were required to be resolved prior to the introduction of tritium to the TFTR site. On April 5, 1993, the TFTR Tritium System Test C-ORR commenced. The results of the C-ORR as documented in the final report by the C-ORR was that category 1 findings were resolved, and it was the recommendation of the C-ORR Team to the PPPL ES ampersand H Board that TFTR initiate the Tritium Systems Test. DOE (Chicago Operations, Princeton Area Office) concurred with the C-ORR final report and on April 29, 1993, at 12:15 pm tritium was introduced to the TFTR site

  6. Operating System Abstraction Layer (OSAL)

    Science.gov (United States)

    Yanchik, Nicholas J.

    2007-01-01

    This viewgraph presentation reviews the concept of the Operating System Abstraction Layer (OSAL) and its benefits. The OSAL is A small layer of software that allows programs to run on many different operating systems and hardware platforms It runs independent of the underlying OS & hardware and it is self-contained. The benefits of OSAL are that it removes dependencies from any one operating system, promotes portable, reusable flight software. It allows for Core Flight software (FSW) to be built for multiple processors and operating systems. The presentation discusses the functionality, the various OSAL releases, and describes the specifications.

  7. 78 FR 77484 - Extension of Agency Information Collection Activity Under OMB Review: Pipeline System Operator...

    Science.gov (United States)

    2013-12-23

    ... Officer, Office of Information Technology (OIT), TSA-11, Transportation Security Administration, 601 South... Information Collection Activity Under OMB Review: Pipeline System Operator Security Information AGENCY... Transportation Security Administration (TSA) has forwarded the Information Collection Request (ICR), Office of...

  8. Operational readiness of EFAD systems

    International Nuclear Information System (INIS)

    Kabat, M.J.

    1992-02-01

    An assessment of the operational readiness of the Emergency Filtered Air Discharge (EFAD) systems, installed in Canadian CANDU multi-unit nuclear power plants, was performed in this project. Relevant Canadian and foreign standards and regulatory requirements have been reviewed and documentation on EFAD system design, operation, testing and maintenance have been assessed to identify likely causes and potential failures of EFAD systems and their components under both standby and accident conditions. Recommendations have also been provided in this report for revisions which are needed to achieve and maintain appropriate operational readiness of EFAD systems

  9. Columbia River System Operation Review final environmental impact statement. Summary

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River System Operation Review (SOR) is being conducted jointly by the US Army Corps of Engineers, the Bureau of Reclamation, and the Bonneville Power Administration. This summary of the SOR story begins where the Draft EIS summary left off. It is divided into seven parts, each of which reports some aspect of the study's outcome: Part 1 is a history. The SOR was not a simple study on any level, and to understand the EIS alternatives, some background is necessary. Part 2 reports the major findings of the technical analysis of alternative system operating strategies, and presents the agencies' Preferred Alternative. Part 3 explains actions the agencies may take with respect to the Columbia River Regional Forum, the Pacific Northwest Coordination Agreement, and the Canadian Entitlement Allocation Agreements. Part 4 presents the Purpose and Need, elements at the core of any Federal EIS. It includes a map showing the Columbia River Basin and information on the affected Federal projects. Part 5 describes the substantial public participation and outreach that occurred during the SOR, and Part 6 summarizes efforts to incorporate the Tribal perspective into the study. Part 7 describes other activities that will be taking place in the next few years, which are related to and build upon the SOR

  10. Review of the total system related to operation of nuclear-powered ship

    International Nuclear Information System (INIS)

    Takamasa, Tomoji; Miyashita, Kunio

    2000-01-01

    It is essential to establish a marine reactor having excellent safety and reliability, which is capable of competing economically with conventional ships, and which can be accepted by international society, in order to be prepared for practical application of future nuclear-powered ships. For this purpose, it is important not only to demonstrate a marine reactor using a model or test device to simulate actual operation, but also to establish the environmental requirements for operation of a nuclear-powered ship, such as safety standards that are operationally and internationally common for ships, and to establish a repair base for nuclear-powered ships. Systems research for the practical application of nuclear-powered ships was conducted for five years, fiscal years 1992 through 1996, by a group in the Japan Atomic Energy Research Institute (JAERI), under the project title 'Review of the total system related to operation of nuclear-powered ships.' The project sought to summarize requirements for the practical application of nuclear-powered ships from the standpoint of the need side, e.g., what nuclear-powered ships will be requested, and what functions will be provided under the expected future social environment; to show a complete system concept for the operation of nuclear-powered ships; and to clarify the situations creating demand for nuclear-powered ships, as well as the system and environmental conditions to be established for operation of practical nuclear-powered ships. Study considerations included the size of the operation system for a nuclear-powered ship, a scenario for introducing a nuclear-powered container ship, and economic evolution from the effects on the whole shipping system, based on container ships, of introducing a nuclear-powered ship. The results of these considerations were made the framework for constructing an entire system and evaluating its economy. The treatment and disposal of radioactive waste from a nuclear-powered ship, and the

  11. Operational expert system applications in Europe

    CERN Document Server

    Zarri, Gian Piero

    1992-01-01

    Operational Expert System Applications in Europe describes the representative case studies of the operational expert systems (ESs) that are used in Europe.This compilation provides examples of operational ES that are realized in 10 different European countries, including countries not usually examined in the standard reviews of the field.This book discusses the decision support system using several artificial intelligence tools; expert systems for fault diagnosis on computerized numerical control (CNC) machines; and expert consultation system for personal portfolio management. The failure prob

  12. Current and Future Flight Operating Systems

    Science.gov (United States)

    Cudmore, Alan

    2007-01-01

    This viewgraph presentation reviews the current real time operating system (RTOS) type in use with current flight systems. A new RTOS model is described, i.e. the process model. Included is a review of the challenges of migrating from the classic RTOS to the Process Model type.

  13. Review on Malaysian Rail Transit Operation and Management System: Issues and Solution in Integration

    Science.gov (United States)

    Masirin, Mohd Idrus Mohd; Salin, Aminah Mohd; Zainorabidin, Adnan; Martin, David; Samsuddin, Norshakina

    2017-08-01

    In any context, operation and management of transportation systems are key issues which may affect both life quality and economic development. In large urban agglomerations, an efficient public transportation system may help abate the negative externalities of private car use such as congestion, air and noise pollution, accident and fuel consumption, without excessively penalizing user travel times or zone accessibility. Thus, this study is conducted to appraise the Malaysian rural rail transit operation and management system, which are considered important as there are many issues and solution in integration of the services that need to be tackled more conscientiously. The purpose of this paper is to describe some of the most important issues on integration of services and rail transit system in Malaysian and how to solve or reduce these problems and conflicts. In this paper, it consists of the historical development of rail transit construction in Malaysia. This paper also attempts to identify the important issues related to rail transit services and integration in Malaysian rural rail operation and management system. Comparison is also conducted with other countries such as UK, France, and Japan. Finally, a critical analysis is presented in this paper by looking at the possible application for future Malaysian rail transit operation system and management, especially focusing on enhancing the quality of Malaysian rural rail transit. In conclusion, this paper is expected to successfully review and appraise the existing Malaysian rural rail transit operation and management system pertaining to issues & solution in integration. It is also hoped that reformation or transformation of present service delivery quality of the rail transit operation and management will enable Malaysia to succeed in transforming Malaysian transportation system to greater heights.

  14. Review of Operation and Maintenance Support Systems for Research Reactors

    International Nuclear Information System (INIS)

    Jin, Kyungho; Heo, Gyunyoung; Park, Jaekwan

    2014-01-01

    Operation support systems do not directly control the plant but it can aid decision making itself by obtaining and analyzing large amounts of data. Recently, the demand of research reactor is growing and the need for operation support systems is increasing, but it has not been applied for research reactors. This study analyzes operation and maintenance support systems of NPPs and suggests appropriate systems for research reactors based on analysis. In this paper, operation support systems for research reactors are suggested by comparing with those of power reactors. Currently, research reactors do not cover special systems in order to improve safety and operability in comparison with power reactors. Therefore we expect to improve worth to use by introducing appropriate systems for research reactors. In further research, we will develop an appropriate system such as applications or tools that can be applied to the research reactor

  15. The concept of information support system for operational personnel of operating NPPs

    International Nuclear Information System (INIS)

    Dunaev, V.G.; Golovanov, V.V.

    1993-01-01

    The paper has been prepared on the materials of the concept developed by the order of ''Rosenergoatom'' concern. In the present paper the main definitions, the principal objectives and functions of the operator support system (OSS) are stated, a brief analysis of operation features of some existing operator information systems is presented, the main trends of development of operator information support system are given, the way and the sequence for implementation of the systems for operating NPPs are reviewed. In this proposed concept in the first place are considered the information support systems for the operators of the power unit main control rooms, however, the presented principles may be applied while designing information support systems for operators of other control rooms of NPP. 4 refs

  16. Review of operating room ventilation standards

    NARCIS (Netherlands)

    Melhado, M.D.A.; Hensen, J.L.M.; Loomans, M.G.L.C.

    2006-01-01

    This article reviews standards applied to operating room ventilation design used by European, South and North American countries. Required environmental parameters are compared with regard to type of surgery, and ventilation system. These requirements as well as their relation to infection control

  17. Operational Readiness Review Implementation Plan for the K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    This implementation plan has been prepared to comply with the requirements of U.S. Department of Energy (DOE) Order 425.1A, Startup and Restart of Nuclear Facilities, and DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews (ORR) (DOE 2002). The scope of the ORR is described in the contractor K Basin Fuel Transfer System (FTS) Plan of Action (POA), which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on April 4, 2002 (FH 2002a). While the Project Hanford Management Contractor has been revised to include DOE Order 425.1B, the contractor implementing procedure, ''F-PRO-055, Startup Readiness (Revision 9) has not yet been approved by RL for contractor use. Appendix A provides a crosswalk between the requirements of DOE Order 425.1A and DOE Order 425.1B to show that all requirements of DOE 425.1B are covered by this implementation plan. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated November 20, 2001 (Roberson 2001). The scope of the ORR is described in the RL Plan of Action, K Basin Fuel Transfer System, prepared by DOE project line management and approved by the RL Manager, the designated approval authority, on September 12, 2002 (Schlender 2002). This implementation plan provides the overall approach and guidelines for performance of the DOE ORR. Appendix B contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  18. Continuous Air Monitor Operating Experience Review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.; Bruyere, S.A.

    2008-01-01

    Continuous air monitors (CAMs) are used to sense radioactive particulates in room air of nuclear facilities. CAMs alert personnel of potential inhalation exposures to radionuclides and can also actuate room ventilation isolation for public and environmental protection. This paper presents the results of a CAM operating experience review of the DOE Occurrence Reporting and Processing System (ORPS) database from the past 18 years. Regulations regarding these monitors are briefly reviewed. CAM location selection and operation are briefly discussed. Operating experiences reported by the U.S. Department of Energy and in other literature sources were reviewed to determine the strengths and weaknesses of these monitors. Power losses, human errors, and mechanical issues cause the majority of failures. The average 'all modes' failure rate is 2.65E-05/hr. Repair time estimates vary from an average repair time of 9 hours (with spare parts on hand) to 252 hours (without spare parts on hand). These data should support the use of CAMs in any nuclear facility, including the National Ignition Facility and the international ITER experiment

  19. 19 CFR 146.26 - System review.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 2 2010-04-01 2010-04-01 false System review. 146.26 Section 146.26 Customs... (CONTINUED) FOREIGN TRADE ZONES Inventory Control and Recordkeeping System § 146.26 System review. The operator shall perform an annual internal review of the inventory control and recordkeeping system and...

  20. Zebrafish housing systems: a review of basic operating principles and considerations for design and functionality.

    Science.gov (United States)

    Lawrence, Christian; Mason, Timothy

    2012-01-01

    The strategies for housing zebrafish used in biomedical research have evolved considerably over the past three decades. To keep pace with the rapid expansion and development of the zebrafish model system, the field has generally moved from keeping fish at the level of aquarium hobbyist to that of industrialized, recirculating aquaculture. Numerous commercial system vendors now offer increasingly sophisticated housing systems based on design principles that maximize the number of animals that can be housed in a given space footprint, and they are thus able to support large and diverse research programs. This review is designed to provide managers, lab animal veterinarians, investigators, and other parties responsible for care and use of these animals with a comprehensive overview of the basic operating and design principles of zebrafish housing systems. This information can be used to help plan the construction of new facilities and/or the upgrade and maintenance of existing operations.

  1. Cleaning up a GNU/Linux operating system

    OpenAIRE

    Oblak , Denis

    2018-01-01

    The aim of the thesis is to develop an application for cleaning up the Linux operating system that would be able to function on most distributions. The theoretical part discusses the cleaning of the Linux operating system that frees up disk space and allows a better functioning. The cleaning techniques and the existing tools for Linux are systematically reviewed and presented. The following part examines the cleaning of the Windows and MacOS operating systems. The thesis also compares all...

  2. Inspection-Class Remotely Operated Vehicles—A Review

    Directory of Open Access Journals (Sweden)

    Romano Capocci

    2017-03-01

    Full Text Available This paper presents a review of inspection-class Remotely Operated Vehicles (ROVs. The review divides the classification of inspection-class ROVs; categorising the vehicles in order of size and capability. A state of the art technology review is undertaken, discussing various common subsystems of the ROV. Standard and novel ROV shapes and designs are reviewed, with emphasis on buoyancy, frame materials and hydrodynamics. Several power considerations and designs are discussed, accounting for battery fed and mains fed systems. ROV telemetry is split into a discussion on the various transmission hardware systems and the communication protocols that are most widely used in industry and research today. A range of thruster technologies is then introduced with consideration taken of the various thruster architectures available. Finally, the navigation and positioning sensors employed for ROV navigation and control are reviewed. The author has also created a number of comparison tables throughout the review; tables include comparison of wired data transmission technology, comparison of common ROV communication protocols and comparisons of various inertial navigation systems. By the end of the review the reader will have clearer understanding on the fundamentals of inspection-class ROV technologies and can use this as an introduction to further paper investigation.

  3. Stack Monitor Operating Experience Review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.; Bruyere, S.A.

    2009-01-01

    Stack monitors are used to sense radioactive particulates and gases in effluent air being vented from rooms of nuclear facilities. These monitors record the levels and types of effluents to the environment. This paper presents the results of a stack monitor operating experience review of the U.S. Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS) database records from the past 18 years. Regulations regarding these monitors are briefly described. Operating experiences reported by the U.S. DOE and in engineering literature sources were reviewed to determine the strengths and weaknesses of these monitors. Electrical faults, radiation instrumentation faults, and human errors are the three leading causes of failures. A representative 'all modes' failure rate is 1E-04/hr. Repair time estimates vary from an average repair time of 17.5 hours (with spare parts on hand) to 160 hours (without spare parts on hand). These data should support the use of stack monitors in any nuclear facility, including the National Ignition Facility and the international ITER project.

  4. Operational readiness of filtered air discharge monitoring systems

    International Nuclear Information System (INIS)

    Lafortune, J.F.; Jamieson, T.J.

    1993-08-01

    An assessment of the operational readiness of the Filtered Air Discharge (FAD) Stack Monitoring systems, installed in Canadian CANDU nuclear power plants, was performed in this project. Relevant Canadian and foreign standards and regulatory requirements have been reviewed and documentation on FAD stack monitoring system design, operation, testing and maintenance have been assessed to identify likely causes and potential failures of FAD stack monitoring systems and their components under both standby and accident conditions. Recommendations have also been provided in this report for design and performance review guidelines for CANDU stations. A case study of the FAD stack monitoring system at Pickering NGS is also documented in this report

  5. Review of the Operability for the Components Under the Loss of the HVAC System of the Pump Room

    International Nuclear Information System (INIS)

    Hwang Mee Jeong; Yoon, Churl; Yang, Joon Eon; Park, Joo Hwan

    2005-01-01

    In this paper, we estimated the temperature of the pump rooms and reviewed the operability of the components under the loss of the HVAC (Heating, Ventilation, and Air Condition) system. The issues relevant to the HVAC system in the PSA (Probabilistic Safety Assessment) FT (Fault Tree) model are as follows: does the loss of the HVAC system bring about a function failure of other components?. Can the operator take action to reduce the temperature of the room in case of a HVAC function failure?. At present we do not know whether a component will lose its function or not under the loss of the HVAC. ASME Standard describes that a recovery action can be credited if the related recovery action is included in the procedure or there are similar recovery experiences in the plant. However, there is no description about the recovery action of the HVAC in the EOP (Emergency Operation Procedure) of the UCN3, 4 under the situation of a loss of the HVAC. Even though we consider this assumption positively, it would be limited to the rooms such as the Switchgear Room, Inverter Room, and Main Control Room etc. where a real recovery action can be performed easily. However, if we consider the HVAC failure in the PSA FT model according to the above background, the problem is that the unavailability induced from the loss of a HVAC is highly unrealistically. From a viewpoint of the PSA, it is not true that the related system always fails even though the HVAC system fails. Therefore, we reviewed the necessity of the HVAC model through the identification of the operable temperature of the components' within the pump room and the change of the temperature of the pump room under the situation of a loss of the HVAC system

  6. Review of current status for designing severe accident management support system

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Kwang Sub

    2000-05-01

    The development of operator support system (OSS) is ongoing in many other countries due to the complexity both in design and in operation for nuclear power plant. The computerized operator support system includes monitoring of some critical parameters, early detection of plant transient, monitoring of component status, plant maintenance, and safety parameter display, and the operator support system for these areas are developed and are being used in some plants. Up to now, the most operator support system covers the normal operation, abnormal operation, and emergency operation. Recently, however, the operator support system for severe accident is to be developed in some countries. The study for the phenomena of severe accident is not performed sufficiently, but, based on the result up to now, the operator support system even for severe accident will be developed in this study. To do this, at first, the current status of the operator support system for normal/abnormal/emergency operation is reviewed, and the positive aspects and negative aspects of systems are analyzed by their characteristics. And also, the major items that should be considered in designing the severe accident operator support system are derived from the review. With the survey of domestic and foreign operator support systems, they are reviewed in terms of the safety parameter display system, decision-making support system, and procedure-tracking system. For the severe accident, the severe accident management guideline (SAMG) which is developed by Westinghouse is reviewed; the characteristics, structure, and logical flow of SAMG are studied. In addition, the critical parameters for severe accident, which are the basis for operators decision-making in severe accident management and are supplied to the operators and the technical support center, are reviewed, too.

  7. Review of current status for designing severe accident management support system

    International Nuclear Information System (INIS)

    Jeong, Kwang Sub

    2000-05-01

    The development of operator support system (OSS) is ongoing in many other countries due to the complexity both in design and in operation for nuclear power plant. The computerized operator support system includes monitoring of some critical parameters, early detection of plant transient, monitoring of component status, plant maintenance, and safety parameter display, and the operator support system for these areas are developed and are being used in some plants. Up to now, the most operator support system covers the normal operation, abnormal operation, and emergency operation. Recently, however, the operator support system for severe accident is to be developed in some countries. The study for the phenomena of severe accident is not performed sufficiently, but, based on the result up to now, the operator support system even for severe accident will be developed in this study. To do this, at first, the current status of the operator support system for normal/abnormal/emergency operation is reviewed, and the positive aspects and negative aspects of systems are analyzed by their characteristics. And also, the major items that should be considered in designing the severe accident operator support system are derived from the review. With the survey of domestic and foreign operator support systems, they are reviewed in terms of the safety parameter display system, decision-making support system, and procedure-tracking system. For the severe accident, the severe accident management guideline (SAMG) which is developed by Westinghouse is reviewed; the characteristics, structure, and logical flow of SAMG are studied. In addition, the critical parameters for severe accident, which are the basis for operators decision-making in severe accident management and are supplied to the operators and the technical support center, are reviewed, too

  8. Upper wind observing systems used for meteorological operations

    Directory of Open Access Journals (Sweden)

    J. Nash

    Full Text Available Methods of upper wind measurements used in operational meteorology have been reviewed to provide guidance to those developing wind profiler radar systems. The main limitations of the various methods of tracking weather balloons are identified using results from the WMO radiosonde comparisons and additional tests in the United Kingdom. Costs associated with operational balloon measurements are reviewed. The sampling and quality of operational aircraft wind observations are illustrated with examples from the ASDAR system. Measurement errors in horizontal winds are quantified wherever possible. When tracking equipment is functioning correctly, random errors in southerly and westerly wind component measurements from aircraft and weather balloons are usually in the range 0.5-2 m s-1.

  9. Overview of real-time operating systems on microprocessor platforms

    International Nuclear Information System (INIS)

    Luong, T.T.

    1994-01-01

    This paper attempts to overview the real-time operating systems on microprocessor platforms in the field of experimental physics facility controls. The key issues regarding operating systems as well as standards and development environment are discussed. As an illustration, some current industrial products are indicated. Also, real-time systems operating in some institutes of the EPS/EPCS inter divisional group are reviewed. (author). 3 refs., 4 figs

  10. Operation and safety decision-making support expert system in NPP

    International Nuclear Information System (INIS)

    Wei Yanhui; Su Desong; Chen Weihua; Zhang Jianbo

    2014-01-01

    The article first reviewed three operation support systems currently used in NPP: real-time information surveillance system, important equipment surveillance system and plant process control and monitoring system, then presents the structure and function of three expert support sub-systems (intelligent alarm monitoring system, computer-based operating procedure support system, safety information expert decision support system). Finally the article discussed the meaning of a kind of operation decision making support system. (authors)

  11. The Effect of Degraded Digital Instrumentation and Control systems on Human-system Interfaces and Operator Performance

    International Nuclear Information System (INIS)

    O'Hara, J.M.; Gunther, B.; Martinez-Guridi, G.; Xing, J.; Barnes, V.

    2010-01-01

    Integrated digital instrumentation and control (I and C) systems in new and advanced nuclear power plants (NPPs) will support operators in monitoring and controlling the plants. Even though digital systems typically are expected to be reliable, their potential for degradation or failure significantly could affect the operators performance and, consequently, jeopardize plant safety. This U.S. Nuclear Regulatory Commission (NRC) research investigated the effects of degraded I and C systems on human performance and on plant operations. The objective was to develop technical basis and guidance for human factors engineering (HFE) reviews addressing the operator's ability to detect and manage degraded digital I and C conditions. We reviewed pertinent standards and guidelines, empirical studies, and plant operating experience. In addition, we evaluated the potential effects of selected failure modes of the digital feedwater control system of a currently operating pressurized water reactor (PWR) on human-system interfaces (HSIs) and the operators performance. Our findings indicated that I and C degradations are prevalent in plants employing digital systems, and the overall effects on the plant's behavior can be significant, such as causing a reactor trip or equipment to operate unexpectedly. I and C degradations may affect the HSIs used by operators to monitor and control the plant. For example, deterioration of the sensors can complicate the operators interpretation of displays, and sometimes may mislead them by making it appear that a process disturbance has occurred. We used the findings as the technical basis upon which to develop HFE review guidance.

  12. British Columbia Power Export Corporation: Operational review for operating year, October 1989 to September 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The British Columbia Power Export Corporation (POWEREX) is a wholly owned subsidiary of British Columbia Hydro, established in 1988 as the single agency responsible for implementing the provincial policy of international electricity trade. POWEREX objectives are to conduct long term firm electricity trade utilizing private sector financing, operating capabilities, and generating sources. Short term electricity transactions are handled by the part of POWEREX called the Powerex Pool Operation. An operational review of POWEREX for 1989-90 is presented, giving information on export contracts, license approvals, export sales negotiations, pool operation revenues and sales, British Columbia Hydro generation and integrated system performance, and operational planning. 15 figs

  13. Operation safety of complex industrial systems

    International Nuclear Information System (INIS)

    Zwingelstein, G.

    1999-01-01

    Zero fault or zero risk is an unreachable goal in industrial activities like nuclear activities. However, methods and techniques exist to reduce the risks to the lowest possible and acceptable level. The operation safety consists in the recognition, evaluation, prediction, measurement and mastery of technological and human faults. This paper analyses each of these points successively: 1 - evolution of operation safety; 2 - definitions and basic concepts: failure, missions and functions of a system and of its components, basic concepts and operation safety; 3 - forecasting analysis of operation safety: reliability data, data-banks, precautions for the use of experience feedback data; realization of an operation safety study: management of operation safety, quality assurance, critical review and audit of operation safety studies; 6 - conclusions. (J.S.)

  14. Operating systems

    CERN Document Server

    Tsichritzis, Dionysios C; Rheinboldt, Werner

    1974-01-01

    Operating Systems deals with the fundamental concepts and principles that govern the behavior of operating systems. Many issues regarding the structure of operating systems, including the problems of managing processes, processors, and memory, are examined. Various aspects of operating systems are also discussed, from input-output and files to security, protection, reliability, design methods, performance evaluation, and implementation methods.Comprised of 10 chapters, this volume begins with an overview of what constitutes an operating system, followed by a discussion on the definition and pr

  15. Advanced human-system interface design review guidelines

    International Nuclear Information System (INIS)

    O'Hara, J.M.

    1990-01-01

    Advanced, computer-based, human-system interface designs are emerging in nuclear power plant control rooms as a result of several factors. These include: (1) incorporation of new systems such as safety parameter display systems, (2) backfitting of current control rooms with new technologies when existing hardware is no longer supported by equipment vendors, and (3) development of advanced control room concepts. Control rooms of the future will be developed almost exclusively with advanced instrumentation and controls based upon digital technology. In addition, the control room operator will be interfacing with more intelligent systems which will be capable of providing information processing support to the operator. These developments may have significant implications for plant safety in that they will greatly affect the operator's role in the system as well as the ways in which he interacts with it. At present, however, the only guidance available to the Nuclear Regulatory Commission (NRC) for the review of control room-operator interfaces is NUREG-0700. It is a document which was written prior to these technological changes and is, therefore, tailored to the technologies used in traditional control rooms. Thus, the present guidance needs to be updated since it is inadequate to serve as the basis for NRC staff review of such advanced or hybrid control room designs. The objective of the project reported in this paper is to develop an Advanced Control Room Design Review Guideline suitable for use in performing human factors reviews of advanced operator interfaces. This guideline will take the form of a portable, interactive, computer-based document that may be conveniently used by an inspector in the field, as well as a text-based document

  16. Advanced Hard Real-Time Operating System, the Maruti Project. Part 2.

    Science.gov (United States)

    1997-01-01

    Real - Time Operating System , The Maruti Project DASG-60-92-C-0055 5b. Program Element # 62301E 6. Author(s...The maruti hard real - time " operating system . A CM SIGOPS, Operating Systems Review. 23:90-106, July 1989. 254 !1 110) C. L. Liu and J. Layland...February 14, 1995 Abstract The Maruti Real - Time Operating System was developed for applications that must meet hard real-time constraints. In order

  17. Human-system Interfaces to Automatic Systems: Review Guidance and Technical Basis

    International Nuclear Information System (INIS)

    O'Hara, J.M.; Higgins, J.C.

    2010-01-01

    Automation has become ubiquitous in modern complex systems and commercial nuclear power plants are no exception. Beyond the control of plant functions and systems, automation is applied to a wide range of additional functions including monitoring and detection, situation assessment, response planning, response implementation, and interface management. Automation has become a 'team player' supporting plant personnel in nearly all aspects of plant operation. In light of the increasing use and importance of automation in new and future plants, guidance is needed to enable the NRC staff to conduct safety reviews of the human factors engineering (HFE) aspects of modern automation. The objective of the research described in this report was to develop guidance for reviewing the operator's interface with automation. We first developed a characterization of the important HFE aspects of automation based on how it is implemented in current systems. The characterization included five dimensions: Level of automation, function of automation, modes of automation, flexibility of allocation, and reliability of automation. Next, we reviewed literature pertaining to the effects of these aspects of automation on human performance and the design of human-system interfaces (HSIs) for automation. Then, we used the technical basis established by the literature to develop design review guidance. The guidance is divided into the following seven topics: Automation displays, interaction and control, automation modes, automation levels, adaptive automation, error tolerance and failure management, and HSI integration. In addition, we identified insights into the automaton design process, operator training, and operations.

  18. Hanford Environmental Information System (HEIS) Operator`s Manual. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, R.I.

    1991-10-01

    The Hanford Environmental Information System (HEIS) is a consolidated set of automated resources that effectively manage the data gathered during environmental monitoring and restoration of the Hanford Site. The HEIS includes an integrated database that provides consistent and current data to all users and promotes sharing of data by the entire user community. This manual describes the facilities available to the operational user who is responsible for data entry, processing, scheduling, reporting, and quality assurance. A companion manual, the HEIS User`s Manual, describes the facilities available-to the scientist, engineer, or manager who uses the system for environmental monitoring, assessment, and restoration planning; and to the regulator who is responsible for reviewing Hanford Site operations against regulatory requirements and guidelines.

  19. Operating System Security

    CERN Document Server

    Jaeger, Trent

    2008-01-01

    Operating systems provide the fundamental mechanisms for securing computer processing. Since the 1960s, operating systems designers have explored how to build "secure" operating systems - operating systems whose mechanisms protect the system against a motivated adversary. Recently, the importance of ensuring such security has become a mainstream issue for all operating systems. In this book, we examine past research that outlines the requirements for a secure operating system and research that implements example systems that aim for such requirements. For system designs that aimed to

  20. Modular integrated video system (MIVS) review station

    International Nuclear Information System (INIS)

    Garcia, M.L.

    1988-01-01

    An unattended video surveillance unit, the Modular Integrated Video System (MIVS), has been developed by Sandia National Laboratories for International Safeguards use. An important support element of this system is a semi-automatic Review Station. Four component modules, including an 8 mm video tape recorder, a 4-inch video monitor, a power supply and control electronics utilizing a liquid crystal display (LCD) are mounted in a suitcase for probability. The unit communicates through the interactive, menu-driven LCD and may be operated on facility power through the world. During surveillance, the MIVS records video information at specified time intervals, while also inserting consecutive scene numbers and tamper event information. Using either of two available modes of operation, the Review Station reads the inserted information and counts the number of missed scenes and/or tamper events encountered on the tapes, and reports this to the user on the LCD. At the end of a review session, the system will summarize the results of the review, stop the recorder, and advise the user of the completion of the review. In addition, the Review Station will check for any video loss on the tape

  1. HOPE information system review

    Science.gov (United States)

    Suzuki, Yoshiaki; Nishiyama, Kenji; Ono, Shuuji; Fukuda, Kouin

    1992-08-01

    An overview of the review conducted on H-2 Orbiting Plane (HOPE) is presented. A prototype model was constructed by inputting various technical information proposed by related laboratories. Especially operation flow which enables understanding of correlation between various analysis items, judgement criteria, technical data, and interfaces with others was constructed. Technical information data base and retrieval systems were studied. A Macintosh personal computer was selected for information shaping because of its excellent function, performance, operability, and software completeness.

  2. Human-system Interfaces to Automatic Systems: Review Guidance and Technical Basis

    Energy Technology Data Exchange (ETDEWEB)

    OHara, J.M.; Higgins, J.C.

    2010-01-31

    Automation has become ubiquitous in modern complex systems and commercial nuclear power plants are no exception. Beyond the control of plant functions and systems, automation is applied to a wide range of additional functions including monitoring and detection, situation assessment, response planning, response implementation, and interface management. Automation has become a 'team player' supporting plant personnel in nearly all aspects of plant operation. In light of the increasing use and importance of automation in new and future plants, guidance is needed to enable the NRC staff to conduct safety reviews of the human factors engineering (HFE) aspects of modern automation. The objective of the research described in this report was to develop guidance for reviewing the operator's interface with automation. We first developed a characterization of the important HFE aspects of automation based on how it is implemented in current systems. The characterization included five dimensions: Level of automation, function of automation, modes of automation, flexibility of allocation, and reliability of automation. Next, we reviewed literature pertaining to the effects of these aspects of automation on human performance and the design of human-system interfaces (HSIs) for automation. Then, we used the technical basis established by the literature to develop design review guidance. The guidance is divided into the following seven topics: Automation displays, interaction and control, automation modes, automation levels, adaptive automation, error tolerance and failure management, and HSI integration. In addition, we identified insights into the automaton design process, operator training, and operations.

  3. Smart Operations in Distributed Energy Resources System

    Science.gov (United States)

    Wei, Li; Jie, Shu; Zhang-XianYong; Qing, Zhou

    Smart grid capabilities are being proposed to help solve the challenges concerning system operations due to that the trade-offs between energy and environmental needs will be constantly negotiated while a reliable supply of electricity needs even greater assurance in case of that threats of disruption have risen. This paper mainly explores models for distributed energy resources system (DG, storage, and load),and also reviews the evolving nature of electricity markets to deal with this complexity and a change of emphasis on signals from these markets to affect power system control. Smart grid capabilities will also impact reliable operations, while cyber security issues must be solved as a culture change that influences all system design, implementation, and maintenance. Lastly, the paper explores significant questions for further research and the need for a simulation environment that supports such investigation and informs deployments to mitigate operational issues as they arise.

  4. Design of an integrated operator support system for advanced NPP MCRs. Issues and perspectives

    International Nuclear Information System (INIS)

    Lee, Seung Jun; Seong Poong-Hyun

    2010-01-01

    Recently, human error has been highlighted as one of the main causes of accidents in nuclear power plants (NPPs). In order to prevent human errors during the main control room (MCR) operations, which are highly complex and mentally taxing activities, improved interfaces and operator support systems have been developed for advanced MCRs. Although operator support systems have the capability to improve the safety and reliability of an NPP, inappropriate designs can have adverse effects on the system safety. Designs based on systematic development frames and validation/verification of the systems are pivotal strategies to circumvent the negative effects of operator support systems. In this paper, an integrated operator support system designed to aid the cognitive activities of operators as well as theoretical and experimental evaluation methods of operator support systems are reviewed. From this review, it was concluded that not only issues about systems (e.g., the accuracy of the system outputs), but also issues about human operators who use the systems (for instance, information quality, the operator's trust and dependency on support systems) should be considered in the design of efficient operator support systems. (author)

  5. Columbia River System Operation Review final environmental impact statement. Appendix S: U.S. Fish and Wildlife Service Coordination Act Report

    International Nuclear Information System (INIS)

    1995-11-01

    This document constitutes the report of the US Fish and Wildlife Service (FWS) relating to the proposed Columbia River System Operation Review (SOR). The SOR proposed alternative consists of a number of specific water management manipulations and new management targets for operating the network of existing Federal Columbia River Power System dams and facilities. This report, therefore, presents a broader, ecosystem planning and management approach for evaluating and resolving those operational and biological uncertainties. Potential mitigation, enhancement and restoration actions associated with the preferred alternative will require an adaptive implementation approach. At the present time and as further changes anticipated in SOR operations occur, the complete, ecosystemwide, synergistic effects of the operation of the current Federal Columbia River Power System cannot be adequately ascertained. However, the initial elements of ecosystem-based remedies are presented in Sections 4 and 5 of this report. These remedies are intended to stimulate action to help conserve distressed fish and wildlife populations, while furthering understanding of the impacts of the SOR preferred alternative on the ecosystem. This Coordination Act Report is the first attempt to integrate fish and wildlife mitigation, enhancement, recovery and restoration needs with the proposed action and the existing Federal Columbia River Power System

  6. Operating experience review in development of SMART MMIS

    International Nuclear Information System (INIS)

    Suh, S. M.; Jang, G. S.; Lee, J. G.; Park, G. O.; Ko, J. H.

    2004-01-01

    We have developed HFE(Human Factors Engineering) program plan for the purpose of implementing man-machine interface system in SMART plant systematically. Elements of the plan are compatible to those of NUREG-0711, Rev.1, and OER(Operating Experience Review) is one of them. The main purpose of conducting an OER as part of HFE review is to identify HFE-related safety issues. If identified, design alternatives are carefully reviewed and selected as the way of resolution for those issues. The performing model of OER is described in this paper, showing a series of works must be done to identify and resolve HFE-related issues within the scope of SMART HFE works. Then two key issues and design alternatives resolving them are presented for examples

  7. Advanced human-system interface design review guidelines

    International Nuclear Information System (INIS)

    O'Hara, J.M.

    1990-01-01

    Advanced, computer-based, human-system interface designs are emerging in nuclear power plant (NPP) control rooms. These developments may have significant implications for plant safety in that they will greatly affect the ways in which operators interact with systems. At present, however, the only guidance available to the US Nuclear Regulatory Commission (NRC) for the review of control room-operator interfaces, NUREG-0700, was written prior to these technological changes and is thus not designed to address them. The objective of the project reported in this paper is to develop an Advanced Control Room Design Review Guideline for use in performing human factors reviews of advanced operator interfaces. This guideline will be implemented, in part, as a portable, computer-based, interactive document for field use. The paper describes the overall guideline development methodology, the present status of the document, and the plans for further guideline testing and development. 21 refs., 3 figs

  8. Report on the Payroll System. MORE: Management Operations Review & Evaluation.

    Science.gov (United States)

    Doody, Robert J.; And Others

    Designed to improve the long-term operational efficiency of the Montgomery County, Maryland, Public Schools (MCPS) payroll system, this study begins with an executive summary, including a set of recommendations and a chapter-by-chapter synopsis. Following an introduction to the study and a general description of the payroll system in chapters 1…

  9. Operation technology of air treatment system in nuclear facilities

    CERN Document Server

    Chun, Y B; Hwong, Y H; Lee, H K; Min, D K; Park, K J; Uom, S H; Yang, S Y

    2001-01-01

    Effective operation techniques were reviewed on the air treatment system to protect the personnel in nuclear facilities from the contamination of radio-active particles and to keep the environment clear. Nuclear air treatment system consisted of the ventilation and filtering system was characterized by some test. Measurement of air velocity of blowing/exhaust fan in the ventilation system, leak tests of HEPA filters in the filtering, and measurement of pressure difference between the areas defined by radiation level were conducted. The results acquired form the measurements were reflected directly for the operation of air treatment. In the abnormal state of virus parts of devices composted of the system, the repairing method, maintenance and performance test were also employed in operating effectively the air treatment system. These measuring results and techniques can be available to the operation of air treatment system of PIEF as well as the other nuclear facilities in KAERI.

  10. Advanced human-system interface design review guideline. Evaluation procedures and guidelines for human factors engineering reviews

    Energy Technology Data Exchange (ETDEWEB)

    O`Hara, J.M.; Brown, W.S. [Brookhaven National Lab., Upton, NY (United States); Baker, C.C.; Welch, D.L.; Granda, T.M.; Vingelis, P.J. [Carlow International Inc., Falls Church, VA (United States)

    1994-07-01

    Advanced control rooms will use advanced human-system interface (HSI) technologies that may have significant implications for plant safety in that they will affect the operator`s overall role in the system, the method of information presentation, and the ways in which operators interact with the system. The U.S. Nuclear Regulatory Commission (NRC) reviews the HSI aspects of control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported to protect public health and safety. The principal guidance available to the NRC, however, was developed more than ten years ago, well before these technological changes. Accordingly, the human factors guidance needs to be updated to serve as the basis for NRC review of these advanced designs. The purpose of this project was to develop a general approach to advanced HSI review and the human factors guidelines to support. NRC safety reviews of advanced systems. This two-volume report provides the results of the project. Volume I describes the development of the Advanced HSI Design Review Guideline (DRG) including (1) its theoretical and technical foundation, (2) a general model for the review of advanced HSIs, (3) guideline development in both hard-copy and computer-based versions, and (4) the tests and evaluations performed to develop and validate the DRG. Volume I also includes a discussion of the gaps in available guidance and a methodology for addressing them. Volume 2 provides the guidelines to be used for advanced HSI review and the procedures for their use.

  11. A systematic review of peri-operative melatonin

    DEFF Research Database (Denmark)

    Andersen, L P H; Werner, M U; Rosenberg, J

    2014-01-01

    We systematically reviewed randomised controlled trials of peri-operative melatonin. We included 24 studies of 1794 participants that reported eight peri-operative outcomes: anxiety; analgesia; sleep quality; oxidative stress; emergence behaviour; anaesthetic requirements; steal induction......%, respectively. Qualitative reviews suggested the melatonin improved sleep quality and emergence behaviour, and might be capable of reducing oxidative stress and anaesthetic requirements....

  12. Development of guidelines to review advanced human-system interfaces

    International Nuclear Information System (INIS)

    O'Hara, J.M.

    1993-01-01

    Advanced control rooms (ACRs) will utilize advanced human-system interface (HSI) technologies that may have significant implications for plant safety in that they will affect the operator's overall role in the system, the method of information presentation, and the ways in which operators interact with the system. The US Nuclear Regulatory Commission (NRC) reviews the HSI aspects of control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported to protect public health and safety. The principal guidance available to the NRC, however, was developed more than 10 yr ago, considerably prior to these technological changes. Accordingly, the human factors guidance needs to be updated to serve as the basis for NRC review of these advanced designs. The purpose of this paper is to discuss the development, evaluation, and current status of the Advanced HSI Design Review Guideline

  13. Daily/Hourly Hydrosystem Operation : How the Columbia River System Responds to Short-Term Needs.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1994-02-01

    The System Operation Review, being conducted by the Bonneville Power Administration, the US Army Corps of Engineers, and the US Bureau of Reclamation, is analyzing current and potential future operations of the Columbia River System. One goal of the System Operations Review is to develop a new System Operation Strategy. The strategy will be designed to balance the many regionally and nationally important uses of the Columbia River system. Short-term operations address the dynamics that affect the Northwest hydro system and its multiple uses. Demands for electrical power and natural streamflows change constantly and thus are not precisely predictable. Other uses of the hydro system have constantly changing needs, too, many of which can interfere with other uses. Project operators must address various river needs, physical limitations, weather, and streamflow conditions while maintaining the stability of the electric system and keeping your lights on. It takes staffing around the clock to manage the hour-to-hour changes that occur and the challenges that face project operators all the time.

  14. Operations management system

    Science.gov (United States)

    Brandli, A. E.; Eckelkamp, R. E.; Kelly, C. M.; Mccandless, W.; Rue, D. L.

    1990-01-01

    The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.

  15. Development of guidelines to review advanced human-system interfaces

    International Nuclear Information System (INIS)

    O'Hara, J.M.

    1993-01-01

    Advanced control rooms (ACRS) will utilize advanced human-system interface (HSI) technologies that may have significant implications for plant safety in that they will affect the operators overall role in the system, the method of information presentation, and the ways in which operators interact with the system. The US Nuclear Regulatory Commission (NRC) reviews the HSI aspects of control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported in order to protect public health and safety. The principal guidance available to the NRC, however, was developed more than ten years ago, well prior to these technological changes. Accordingly, the human factors guidance needs to be updated to serve as the basis for NRC review of these advanced designs. The purpose of this paper is to discuss the development, evaluation, and current status of the Advanced HSI Design Review Guideline, hereafter referred to as the ''Guideline.''

  16. Review on open source operating systems for internet of things

    Science.gov (United States)

    Wang, Zhengmin; Li, Wei; Dong, Huiliang

    2017-08-01

    Internet of Things (IoT) is an environment in which everywhere and every device became smart in a smart world. Internet of Things is growing vastly; it is an integrated system of uniquely identifiable communicating devices which exchange information in a connected network to provide extensive services. IoT devices have very limited memory, computational power, and power supply. Traditional operating systems (OS) have no way to meet the needs of IoT systems. In this paper, we thus analyze the challenges of IoT OS and survey applicable open source OSs.

  17. Optimization Methods in Operations Research and Systems Analysis

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 2; Issue 6. Optimization Methods in Operations Research and Systems Analysis. V G Tikekar. Book Review Volume 2 Issue 6 June 1997 pp 91-92. Fulltext. Click here to view fulltext PDF. Permanent link:

  18. Review of Current Nuclear Vacuum System Technologies

    International Nuclear Information System (INIS)

    Carroll, M.; McCracken, J.; Shope, T.

    2003-01-01

    Nearly all industrial operations generate unwanted dust, particulate matter, and/or liquid wastes. Waste dust and particulates can be readily tracked to other work locations, and airborne particulates can be spread through ventilation systems to all locations within a building, and even vented outside the building - a serious concern for processes involving hazardous, radioactive, or nuclear materials. Several varieties of vacuum systems have been proposed and/or are commercially available for clean up of both solid and liquid hazardous and nuclear materials. A review of current technologies highlights both the advantages and disadvantages of the various systems, and demonstrates the need for a system designed to address issues specific to hazardous and nuclear material cleanup. A review of previous and current hazardous/nuclear material cleanup technologies is presented. From simple conventional vacuums modified for use in industrial operations, to systems specifically engineered for such purposes, the advantages and disadvantages are examined in light of the following criteria: minimal worker exposure; minimal secondary waste generation;reduced equipment maintenance and consumable parts; simplicity of design, yet fully compatible with all waste types; and ease of use. The work effort reviews past, existing and proposed technologies in light of such considerations. Accomplishments of selected systems are presented, including identified areas where technological improvements could be suggested

  19. Evaluating Management Information Systems, A Protocol for Automated Peer Review Systems

    Science.gov (United States)

    Black, Gordon C.

    1980-01-01

    This paper discusses key issues in evaluating an automated Peer Review System. Included are the conceptual base, design, steps in planning structural components, operation parameters, criteria, costs and a detailed outline or protocol for use in the evaluation. At the heart of the Peer Review System is the criteria utilized for measuring quality. Criteria evaluation should embrace, as a minimum, appropriateness, validity and reliability, and completemess or comprehensiveness of content. Such an evaluation is not complete without determining the impact (clinical outcome) of the service system or the patient and the population served.

  20. Tritium Room Air Monitor Operating Experience Review

    Energy Technology Data Exchange (ETDEWEB)

    L. C. Cadwallader; B. J. Denny

    2008-09-01

    Monitoring the breathing air in tritium facility rooms for airborne tritium is a radiological safety requirement and a best practice for personnel safety. Besides audible alarms for room evacuation, these monitors often send signals for process shutdown, ventilation isolation, and cleanup system actuation to mitigate releases and prevent tritium spread to the environment. Therefore, these monitors are important not only to personnel safety but also to public safety and environmental protection. This paper presents an operating experience review of tritium monitor performance on demand during small (1 mCi to 1 Ci) operational releases, and intentional airborne inroom tritium release tests. The tritium tests provide monitor operation data to allow calculation of a statistical estimate for the reliability of monitors annunciating in actual tritium gas airborne release situations. The data show a failure to operate rate of 3.5E-06/monitor-hr with an upper bound of 4.7E-06, a failure to alarm on demand rate of 1.4E-02/demand with an upper bound of 4.4E-02, and a spurious alarm rate of 0.1 to 0.2/monitor-yr.

  1. Mobile Operating Systems

    OpenAIRE

    Vipin Kamboj; Hitesh Gupta

    2012-01-01

    Mobile phones are used by every people in today’s life. We use mobile phones without knowing the different factors that a mobile used including its technology, operating system, CPU ,RAM etc. Many types of operating system are used by different mobile. Every operating system has their advantage

  2. Advanced human-system interface design review guideline. Evaluation procedures and guidelines for human factors engineering reviews

    International Nuclear Information System (INIS)

    O'Hara, J.M.; Brown, W.S.; Baker, C.C.; Welch, D.L.; Granda, T.M.; Vingelis, P.J.

    1994-07-01

    Advanced control rooms will use advanced human-system interface (HSI) technologies that may have significant implications for plant safety in that they will affect the operator's overall role in the system, the method of information presentation, and the ways in which operators interact with the system. The U.S. Nuclear Regulatory Commission (NRC) reviews the HSI aspects of control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported to protect public health and safety. The principal guidance available to the NRC, however, was developed more than ten years ago, well before these technological changes. Accordingly, the human factors guidance needs to be updated to serve as the basis for NRC review of these advanced designs. The purpose of this project was to develop a general approach to advanced HSI review and the human factors guidelines to support. NRC safety reviews of advanced systems. This two-volume report provides the results of the project. Volume I describes the development of the Advanced HSI Design Review Guideline (DRG) including (1) its theoretical and technical foundation, (2) a general model for the review of advanced HSIs, (3) guideline development in both hard-copy and computer-based versions, and (4) the tests and evaluations performed to develop and validate the DRG. Volume I also includes a discussion of the gaps in available guidance and a methodology for addressing them. Volume 2 provides the guidelines to be used for advanced HSI review and the procedures for their use

  3. Operation and maintenance requirements of system design bases

    International Nuclear Information System (INIS)

    Banerjee, A.K.; Hanley, N.E.

    1989-01-01

    All system designs make assumptions about system operation testing, inspection, and maintenance. Existing industry codes and standards explicitly address design requirements of new systems, while issues related to system and plant reliability, life, design margins, effects of service conditions, operation, maintenance, etc., usually are implicit. However, system/component design documents of existing power plants often address the code requirements without considering the operation, maintenance, inspection, and testing (OMIT) requirements. The nuclear industry is expending major efforts at most nuclear power plants to reassemble and/or reconstitute system design bases. Stone ampersand Webster Engineering Corporation (SWEC) recently addressed the OMIT requirements of system/component design as an integral part of a utility's preventive maintenance program. For each component, SWEC reviewed vendor recommendations, NPRDS data/industry experience, the existing maintenance program, component service conditions, and actual plant experience. A maintenance program that considers component service conditions and plant experience ensures a connection between maintenance and design basis. Root cause analysis of failure and engineering evaluation of service condition are part of the program. System/component OMIT requirements also are compared against system design, service condition, degradation mechanism, etc., through system/component life-cycle evaluation

  4. Review and updates of the risk assessment for advanced test reactor operations for operating events and experience

    International Nuclear Information System (INIS)

    Atkinson, S.A.

    1996-01-01

    Annual or biannual reviews of the operating history of the Advanced Test Reactor (ATR) at the Idaho National Engineering Laboratory (INEL) have been conducted for the purpose of reviewing and updating the ATR probabilistic safety assessment (PSA) for operating events and operating experience since the first compilation of plant- specific experience data for the ATR PSA which included data for operation from initial power operation in 1969 through 1988. This technical paper briefly discusses the means and some results of these periodic reviews of operating experience and their influence on the ATR PSA

  5. Nuclear Power Plant Operating Experience from the IAEA/NEA International Reporting System for Operating Experience 2012-2014

    International Nuclear Information System (INIS)

    2018-03-01

    The International Reporting System for Operating Experience (IRS) is an essential element of the international operating experience feedback system for nuclear power plants. Its fundamental objective is to contribute to improving safety of commercial nuclear power plants which are operated worldwide. IRS reports contain information on events of safety significance with important lessons learned which assist in reducing recurrence of events at other plants. This sixth publication, covering the period 2012 - 2014, follows the structure of the previous editions. It highlights important lessons based on a review of the approximately 240 event reports received from the participating countries over this period.

  6. Configuration control during plant outages. A review of operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Peinador Veira, Miguel; El Kanbi, Semir [European Commission Joint Research Centre, Petten (Netherlands). Inst. for Energy and Transport; Stephan, Jean-Luc [Institut de Radioprotection et de Surete Nucleaire (IRSN), Fontenay-aux-Roses (France); Martens, Johannes [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, Koeln (Germany)

    2015-03-15

    After the occurrence of several significant events in nuclear power plants during shut-down modes of operation in the eighties, and from the results of probabilistic safety assessments completed in the nineties, it was clear that risk from low power and shutdown operational modes could not be neglected and had to be addressed by appropriate safety programs. A comprehensive review of operating experience from the last ten years has been conducted by the Joint Research Centre with the objective of deriving lessons learned and recommendations useful for nuclear regulatory bodies and utilities alike. This paper is focused on one particular challenge that any nuclear plant faces whenever it plans its next outage period: how to manage the configuration of all systems under a complex environment involving numerous concurrent activities, and how to make sure that systems are returned to their valid configuration before the plant resumes power operation. This study highlights the importance of conveying accurate but synthesized information on the status of the plant to the operators in the main control room. Many of the lessons learned are related to the alarm display in the control room and to the use of check lists to control the status of systems. Members of the industry and safety authorities may now use these recommendations and lessons learned to feed their own operating experience feedback programs, and check their applicability for specific sites.

  7. Control Transfer in Operating System Kernels

    Science.gov (United States)

    1994-05-13

    microkernel system that runs less code in the kernel address space. To realize the performance benefit of allocating stacks in unmapped kseg0 memory, the...review how I modified the Mach 3.0 kernel to use continuations. Because of Mach’s message-passing microkernel structure, interprocess communication was...critical control transfer paths, deeply- nested call chains are undesirable in any case because of the function call overhead. 4.1.3 Microkernel Operating

  8. Reliability assurance program for operational emergency ac power system

    International Nuclear Information System (INIS)

    Heineman, J.B.; Ragland, W.A.; Mueller, C.J.

    1985-01-01

    A comprehensive review of emergency ac power systems in nuclear generating plants (the vast majority of these plants contain redundant diesel generator systems) delineates several operational areas that can be improved by instituting a reliability assurance program (RAP), which initially upgrades the diesel generator performance and provides for ongoing monitoring and maintenance based upon alert levels

  9. Real-time operating system for a multi-laser/multi-detector system

    Science.gov (United States)

    Coles, G.

    1980-01-01

    The laser-one hazard detector system, used on the Rensselaer Mars rover, is reviewed briefly with respect to the hardware subsystems, the operation, and the results obtained. A multidetector scanning system was designed to improve on the original system. Interactive support software was designed and programmed to implement real time control of the rover or platform with the elevation scanning mast. The formats of both the raw data and the post-run data files were selected. In addition, the interface requirements were selected and some initial hardware-software testing was completed.

  10. Operational Readiness Review: Savannah River Replacement Tritium Facility

    International Nuclear Information System (INIS)

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members

  11. Importance of safety review to the safe operation of a nuclear plant

    International Nuclear Information System (INIS)

    Brinkerhoff, L.C.

    1978-01-01

    Widely differing standards of construction of nuclear reactors are employed in different countries. Although the reactor vendors, including designers and construction contractors, have a vested interest in safety, the ultimate responsibility for safety rests with the reactor facility operator. Even though governmental agencies, either directly or indirectly, must take a strong lead in developing policies and practices of safe operation, the reactor facility operator must recognize and accept the full responsibility for safe operation of the facility. The policies and practices of safe operation imposed by governmental agencies must help assure the prudent operation and the adequate maintenance of those structures, systems, and components of importance to safety. Since each country has a slightly different philosophy for achieving safety and each vendor utilizes different structures, systems, and components to fulfil this philosophy, it is imperative that the facility operator adequately maintain those engineered safety features and those plant protective systems which have been engineered into achieving the desired levels of safety. An additional method of helping to assure that those structures, systems, and components of importance to safety are prudently operated and adequately maintained is to assign the full safety responsibility for the overall operations of the reactor facility to the operating organization, i.e. assigning a 'line of responsibility' within the reactor facility operator. This assurance can be further strengthened by requiring that the facility operator establish a safety review body that overviews the operation and assures that the operating organization complies with those policies and practices of safe operation which have been imposed on the reactor facility. (author)

  12. Modern operating systems

    CERN Document Server

    Tanenbaum, Andrew S

    2015-01-01

    Modern Operating Systems, Fourth Edition, is intended for introductory courses in Operating Systems in Computer Science, Computer Engineering, and Electrical Engineering programs. It also serves as a useful reference for OS professionals ' The widely anticipated revision of this worldwide best-seller incorporates the latest developments in operating systems (OS) technologies. The Fourth Edition includes up-to-date materials on relevant'OS. Tanenbaum also provides information on current research based on his experience as an operating systems researcher. ' Modern Operating Systems, Third Editionwas the recipient of the 2010 McGuffey Longevity Award. The McGuffey Longevity Award recognizes textbooks whose excellence has been demonstrated over time.'http://taaonline.net/index.html " Teaching and Learning Experience This program will provide a better teaching and learning experience-for you and your students. It will help: ' *Provide Practical Detail on the Big Picture Concepts: A clear and entertaining writing s...

  13. New Brunswick System Operator 2005 annual report

    International Nuclear Information System (INIS)

    2005-01-01

    New Brunswick's electricity generating mix includes thermal, hydro and nuclear power. Facts about New Brunswick's electricity market were presented with reference to transmission lines; number of interconnecting operators; interconnection capacity; installed generation capacity; generation capacity mix; peak demand for 2004-2005; total energy transactions over a 6 month period and value of electricity over that 6 month period. The independently governed New Brunswick System Operator (NBSO) began operations in 2004 with a mandate to introduce competitive integrated electricity supply to municipal utilities and large industrial customers in order to ensure a reliable and adequate supply of electricity to the Maritime area. The NBSO's first task to launch the transition from monopoly supply to a competitive market is in the beginning stages, but progress has been made in terms of market rules, new computerized systems, and consultations with the Market Advisory Committee who review potential changes to the market rules and tariffs. tabs., figs

  14. Design/Operations review of core sampling trucks and associated equipment

    International Nuclear Information System (INIS)

    Shrivastava, H.P.

    1996-01-01

    A systematic review of the design and operations of the core sampling trucks was commissioned by Characterization Equipment Engineering of the Westinghouse Hanford Company in October 1995. The review team reviewed the design documents, specifications, operating procedure, training manuals and safety analysis reports. The review process, findings and corrective actions are summarized in this supporting document

  15. Use of technology to support information needs for continuity of operations planning in public health: a systematic review.

    Science.gov (United States)

    Reeder, Blaine; Turner, Anne; Demiris, George

    2010-01-01

    Continuity of operations planning focuses on an organization's ability to deliver essential services before, during and after an emergency. Public health leaders must make decisions based on information from many sources and their information needs are often facilitated or hindered by technology. The aim of this study is to provide a systematic review of studies of technology projects that address public health continuity of operations planning information needs and to discuss patterns, themes, and challenges to inform the design of public health continuity of operations information systems. To return a comprehensive results set in an under-explored area, we searched broadly in the Medline and EBSCOHost bibliographic databases using terms from prior work in public health emergency management and continuity of operations planning in other domains. In addition, we manually searched the citation lists of publications included for review. A total of 320 publications were reviewed. Twenty studies were identified for inclusion (twelve risk assessment decision support tools, six network and communications-enabled decision support tools, one training tool and one dedicated video-conferencing tool). Levels of implementation for information systems in the included studies range from proposed frameworks to operational systems. There is a general lack of documented efforts in the scientific literature for technology projects about public health continuity of operations planning. Available information about operational information systems suggest inclusion of public health practitioners in the design process as a factor in system success.

  16. Network operating system

    Science.gov (United States)

    1985-01-01

    Long-term and short-term objectives for the development of a network operating system for the Space Station are stated. The short-term objective is to develop a prototype network operating system for a 100 megabit/second fiber optic data bus. The long-term objective is to establish guidelines for writing a detailed specification for a Space Station network operating system. Major milestones are noted. Information is given in outline form.

  17. Expert systems for plant operations training and assistance

    International Nuclear Information System (INIS)

    Pack, R.W.; Lazar, P.M.; Schmidt, R.V.; Gaddy, C.D.

    1988-01-01

    The project described in this paper explored the use of expert systems for plant operations training and assistance. Three computer technologies were reviewed: computer-aided instruction, expert systems, and expert training systems (ETS). The technology of CAI has been developed since the early 1960s, and a wide range of applications are available commercially today. Expert systems have been developed primarily as job performance aids, and the number of commercial applications is increasing. A fully developed ETS has models of the trainer and trainee, in addition to a knowledge base

  18. Reproducibility of neuroimaging analyses across operating systems.

    Science.gov (United States)

    Glatard, Tristan; Lewis, Lindsay B; Ferreira da Silva, Rafael; Adalat, Reza; Beck, Natacha; Lepage, Claude; Rioux, Pierre; Rousseau, Marc-Etienne; Sherif, Tarek; Deelman, Ewa; Khalili-Mahani, Najmeh; Evans, Alan C

    2015-01-01

    Neuroimaging pipelines are known to generate different results depending on the computing platform where they are compiled and executed. We quantify these differences for brain tissue classification, fMRI analysis, and cortical thickness (CT) extraction, using three of the main neuroimaging packages (FSL, Freesurfer and CIVET) and different versions of GNU/Linux. We also identify some causes of these differences using library and system call interception. We find that these packages use mathematical functions based on single-precision floating-point arithmetic whose implementations in operating systems continue to evolve. While these differences have little or no impact on simple analysis pipelines such as brain extraction and cortical tissue classification, their accumulation creates important differences in longer pipelines such as subcortical tissue classification, fMRI analysis, and cortical thickness extraction. With FSL, most Dice coefficients between subcortical classifications obtained on different operating systems remain above 0.9, but values as low as 0.59 are observed. Independent component analyses (ICA) of fMRI data differ between operating systems in one third of the tested subjects, due to differences in motion correction. With Freesurfer and CIVET, in some brain regions we find an effect of build or operating system on cortical thickness. A first step to correct these reproducibility issues would be to use more precise representations of floating-point numbers in the critical sections of the pipelines. The numerical stability of pipelines should also be reviewed.

  19. Operating Experience Review(OER) and development of Issues Tracking System(ITS) for Jordan Research and Training Reactor(JRTR)

    International Nuclear Information System (INIS)

    Kim, Yong Jun; Lee, Hyun Chul

    2011-01-01

    The operation of the Jordan Research and Training Reactor which Korean consortium designs will start in March 2015. Though the power level of JRTR is different from the one of HANARO, a Korean research reactor, experience and expertise gained from the successful operation of the multipurpose research reactor, HANARO, would be applied for the design of JRTR because the basic operation principles of two reactors are almost same. From the point of human factors view, Operating Experience Review (OER) has the accurate purpose of reflecting accumulated knowledge to a new design and this activity are required to perform in the beginning stage of the control room designs in nuclear facilities. OER is to identify human factors engineering (HFE) issues related to safety. The issues from operating experience provide a basis for improving the plant design in a timely way. Identified issues are reported to an issues tracking system (ITS) so as to manage and resolve issues. HFE related safety issues are to be extracted from OER. The purpose of this paper is to present the scope and methods of OER for the JRTR design. In addition, a new ITS is proposed. The ITS is effective for issue management and has simplified states for issue development and small numbers of steps for issue control

  20. Review of biomass fired space heating/domestic hot water boilers' application, operation and design parameters

    International Nuclear Information System (INIS)

    1997-01-01

    Monitoring exercises have been carried out for ETSU, by a number of contractors, on a number of wood fired heating schemes; feasibility studies on proposed schemes have also been carried out. Monitoring reports and feasibility studies have been reviewed to try and establish the suitability and economic viability of the various types of plant used (or proposed) and their application. Of the sixteen schemes reviewed just over 30% showed a reasonable return on the incremental capital cost of plant compared to gas oil fired plant. These schemes had one or more of the following attributes: - Low wood fuel cost -Long operating hours -Relatively low incremental capital cost of wood plant over gas oil plant. Small systems with low operating hours (e.g. short weekday occupancy premises, like schools) and relatively high incremental operating and maintenance costs and capital costs exhibited no advantage over equivalent fossil fuel fired plant. The unit fuel cost advantage to wood, in these cases, was insufficient to outweigh the increased O and M and capital costs, because of the comparatively low annual fuel consumption. Most of the plants reviewed had low thermal efficiencies due to the simplicity of the fuel to air control systems and the wide range of heating demand over which they had to operate. The former can be increased by improved combustion control systems and the latter by correct sizing of boilers and/or the installation of hybrid systems. (Author)

  1. Evaluating Management Information Systems, A Protocol for Automated Peer Review Systems

    OpenAIRE

    Black, Gordon C.

    1980-01-01

    This paper discusses key issues in evaluating an automated Peer Review System. Included are the conceptual base, design, steps in planning structural components, operation parameters, criteria, costs and a detailed outline or protocol for use in the evaluation.

  2. Review of operational aids for nuclear plant operators

    International Nuclear Information System (INIS)

    Kisner, R.A.

    1983-01-01

    Many approaches are being explored to improve the safety of nuclear plant operations. One approach is to supply high-quality, relevant information by means of computer-based diagnostic systems to assist plant operators in performing their operational and safety-related roles. The evaluation of operational aids to ensure safe plant operations is a necessary function of NRC. This work has two purposes: to collect limited data on a diversity of operational aids, and to provide a method for evaluating the safety implications of the functions of proposed operational aids. After a discussion of the method evaluation now under study, this paper outlines this data collection to date

  3. Review of operating history at the Palisades Nuclear Plant

    International Nuclear Information System (INIS)

    Mays, G.T.; Harrington, K.H.

    1982-01-01

    the Systematic Evaluation Program Branch (SEPB) of the Nuclear Regulatory Commission (NRC) is conducting the Systematic Evaluation Program whose purpose is to determine the safety margins of the design and operation of the eleven oldest operating commercial nuclear power plants in the United States. A portion of the SEP includes the compilation and interpretation of operational occurrences at these plants. This summary describes the methodology and results of the operational experience review of Palisades Nuclear Plant. The review includes a detailed examination of the operating experience in two segments - plant shutdowns and power reductions, and reportable events

  4. Development of web-based safety review advisory system

    International Nuclear Information System (INIS)

    Kim, M. W.; Lee, H. C.; Park, S. O.; Lee, K. H.; Hur, K. Y.; Lee, S. J.; Choi, S. S.; Kang, C. M.

    2002-01-01

    For the development of an expert system supporting the safety review of nuclear power plants, the application was implemented after gathering necessary theoretical background and practical requirements. The general and the detail functional specifications were established, and they are investigated by KINS (Korea Institute of Nuclear Safety). The Safety Review Advisory System(SRAS), this application on web-server environment was developed according to the above specifications. Reviews can do their safety reviewing regardless of their speciality or reviewing experiences because SRAS is operated by the safety review plans which are converted to standardized format. When the safety reviewing is carried out by using SRAS, the results of safety reviewing are accumulated in the database and may be utilized later usefully, and we can grasp safety reviewing progress. Users of SRAS are categorized into four groups, administrator, project manager, project reviewer and general reviewer. Each user group is delegated appropriate access capability. The function and some screen shots of SRAS are described

  5. Development of web-based safety review advisory system

    International Nuclear Information System (INIS)

    Kim, M. W.; Hur, K. Y.; Lee, S. J.; Choi, S. J.

    2002-01-01

    For the development of an expert system supporting the safety review of nuclear power plants, the application was implemented after gathering necessary theoretical background and practical requirements. The general and the detail functional specifications were established, and they are investigated by KINS. Safety Review Advisory System (SRAS), this application on web-server environment was developed according to the above specifications. Reviews can do their safety reviewing regardless of their speciality or reviewing experiences because SRAS is operated by the safety review plans which are converted to standardized format. When the safety reviewing is carried out by using SRAS, the results of safety reviewing are accumulated in the database and may be utilized later usefully, and we can grasp safety reviewing progress. Users of SRAS are categorized into four groups, administrator, project manager, project reviewer and general reviewer. Each user group is delegated appropriate access capability. The function and some screen shots of SRAS are described

  6. Operating experiences in fuel handling system at KGS

    International Nuclear Information System (INIS)

    Reddy, G.P.; Nagabhushanam

    2006-01-01

    Refuelling operations were started at KGS in August, 2000. Rich and varied experience was gained during this period through internal discussion/Quality circles/Procedural reviews and analysis of various incidents that have taken place in KGS and other units of NPCIL Some of the unique jobs carried out at KGS include-Development of tools for in-situ replacement of FM front end cover in FM service area (which was done for the first time in NPCIL history), Modification of FM magazine rear end plate mounting screws to avoid the possibility of magazine rotation stalling, The incident of Stalling of B-Ram during installation of upstream shield plug in KGS - 1 has brought out many weakness that were existing in the system in a dormant manner. Review of maintenance procedures was carried out and a special underwater operated sensor was developed and installed in Transfer Magazine to sense the presence and proper positioning of fuel bundles in the Transfer magazine tube during fuel loading operation. Numerous modifications were carried out in the system to increase equipment reliability, ease of operation and maintenance, to reduce man-rem consumption. Most notable among these modifications include -zig saw panel modification, EFCV O-ring modification, Ram BF switch modification, provision for increase in SFSB level provision, snout clamp oil circuit modification, ball valve actuator modification, installation of additional switch for sensing STS carriage UP position etc, This paper focuses on the challenges tackled in achieving near perfect performance, innovations and improvements carried out in the system to strive for this goal and development of procedures for reducing man-rem consumption and life extension of critical components. (author)

  7. Operating experience feedback report: Service water system failures and degradations: Volume 3

    International Nuclear Information System (INIS)

    Lam, P.; Leeds, E.

    1988-11-01

    A comprehensive review and evaluation of service water system failures and degradations observed in operating events in light water reactors from 1980 to 1987 has been conducted. The review and evaluation focused on the identification of causes of system failures and degradations, the adequacy of corrective actions implemented and planned, and the safety significance of the operating events. The results of this review and evaluation indicate that the service water system failures and degradations have significant safety implications. These system failures and degradations are attributable to a great variety of causes, and have adverse impact on a large number of safety-related systems and components which are required to mitigate reactor accidents. Specifically, the causes of failures and degradations include various fouling mechanisms (sediment deposition, biofouling, corrosion and erosion, pipe coating failure, calcium carbonate, foreign material and debris intrusion); single failures and other design deficiencies; flooding; multiple equipment failures; personnel and procedural errors; and seismic deficiencies. Systems and components adversely impacted by a service water system failure or degradation include the component cooling water system, emergency diesel generators, emergency core cooling system pumps and heat exchangers, the residual heat removal system, containment spray and fan coolers, control room chillers, and reactor building cooling units. 44 refs., 10 figs., 5 tabs

  8. Reducing Development and Operations Costs using NASA's "GMSEC" Systems Architecture

    Science.gov (United States)

    Smith, Dan; Bristow, John; Crouse, Patrick

    2007-01-01

    This viewgraph presentation reviews the role of Goddard Mission Services Evolution Center (GMSEC) in reducing development and operation costs in handling the massive data from NASA missions. The goals of GMSEC systems architecture development are to (1) Simplify integration and development, (2)Facilitate technology infusion over time, (3) Support evolving operational concepts, and (4) All for mix of heritage, COTS and new components. First 3 missions (i.e., Tropical Rainforest Measuring Mission (TRMM), Small Explorer (SMEX) missions - SWAS, TRACE, SAMPEX, and ST5 3-Satellite Constellation System) each selected a different telemetry and command system. These results show that GMSEC's message-bus component-based framework architecture is well proven and provides significant benefits over traditional flight and ground data system designs. The missions benefit through increased set of product options, enhanced automation, lower cost and new mission-enabling operations concept options .

  9. Safety management of a complex R and D ground operating system

    Science.gov (United States)

    Connors, J. F.; Maurer, R. A.

    1975-01-01

    A perspective on safety program management was developed for a complex R&D operating system, such as the NASA-Lewis Research Center. Using a systems approach, hazardous operations are subjected to third-party reviews by designated-area safety committees and are maintained under safety permit controls. To insure personnel alertness, emergency containment forces and employees are trained in dry-run emergency simulation exercises. The keys to real safety effectiveness are top management support and visibility of residual risks.

  10. IAEA Operational Safety Team Reviews Saint-Alban Nuclear Power Plant, France

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed safety practices at France's Saint-Alban Nuclear Power Plant (NPP) and has highlighted a set of strong practices as well as a series of recommendations to reinforce them. The IAEA assembled the team at the request of the Government of France to conduct an Operational Safety Review (OSART) of the Saint-Alban NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review from 20 September to 6 October 2010. The team was made up of experts from Belgium, Canada, the Czech Republic, Germany, Lithuania, the Netherlands, Slovakia, Sweden and the USA. An OSART mission is designed to review programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at Saint-Alban conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely are under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; and Emergency Planning and Preparedness. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: A safety guideline for outages; The use of remote video surveillance of fuel inspection and handling activities; A motivational tool for plant staff regarding the benefits of operating experience and associated corrective actions; and Use of a sophisticated key control system

  11. Review of nuclear power plant systems

    International Nuclear Information System (INIS)

    Doehler

    1980-01-01

    This presentation starts with a brief description of the Technischer Ueberwachungs-Verein (TUeV) and its main activities in the field of technical assessments. The TUeV-organisation is in general the assessor who performs the review if nuclear power plant systems, structures and equipment. All aspects relating to the safe operation of nuclear power plants are assessed by the TUeV. This paper stresses the review of the design of nuclear power plant systems and structures. It gives an outline on the procedure of an assessment, starting with the regulatory requirements, going into the papers of the applicant and finally ending with the TUeV-appraisal. This procedure is shown using settlement measuring requirements as an example. The review of the design of mechanical structures such as pipes, valves, pump and vessels is shown in detail. (RW)

  12. Waste Receiving and Processing (WRAP) Facility Public Address System Review Findings

    International Nuclear Information System (INIS)

    HUMPHRYS, K.L.

    1999-01-01

    Public address system operation at the Waste Receiving and Processing (WRAP) facility was reviewed. The review was based on an Operational Readiness Review finding that public address performance was not adequate in parts of the WRAP facility. Several improvements were made to the WRAP Public Address (PA) system to correct the deficiencies noted. Speaker gain and position was optimized. A speech processor was installed to boost intelligibility in high noise areas. Additional speakers were added to improve coverage in the work areas. The results of this evaluation indicate that further PA system enhancements are not warranted. Additional speakers cannot compensate for the high background sound and high reverberation levels found in the work areas. Recommendations to improve PA system intelligibility include minor speaker adjustments, enhanced PA announcement techniques, and the use of sound reduction and abatement techniques where economically feasible

  13. Review of droop-controlled bi-directional inverter in conducting islanded operation of photovoltaic systems

    Science.gov (United States)

    Khaw, Ace Lin Yi; Wong, Jianhui; Lim, Yun Seng

    2017-04-01

    Global warming due to the excessive greenhouse gas emissions has led to the emergence of green technologies in Malaysia, particularly photovoltaic (PV) systems. Under the current regulatory framework, islanded operation of the PV system is not permissible. As a result, any renewable energy sources will be disconnected immediately in the event of grid outages. This practice is to ensure the safety of working personnel, as well as the customer equipment connected within the distribution networks. In addition, there is no synchronizing equipment to aid the reconnection of the islanded network to the grid. However, with the shutdown of the Distributed Generator (DG) during islanded operation, the customers are not able to utilize the available renewable energy and the number of power interruption is not improved with the renewable energy sources. Therefore, the main objective of this paper is to investigate the feasibility of the PV system in conducting islanding operation with the use of Energy Storage System (ESS). This paper also proposes a control algorithm to maintain the voltage and frequency excursion within the statutory limit by manipulating the real and reactive power flow of the ESS within the transition period between grid connected and islanding operation.

  14. Peer Review: Promoting Efficient School District Operations

    Science.gov (United States)

    Hale, Jason S.

    2010-01-01

    Many professions recognize the benefits of peer reviews to assess processes and operations because peers can more easily identify one another's inefficiencies and provide some kind of intervention. Generally, the goal of the peer review process is to verify whether the work satisfies the standards set by the industry. A number of states have begun…

  15. Independent technical review of the Hanford Tank Farm Operations

    International Nuclear Information System (INIS)

    1992-07-01

    The Independent Technical Assessment of the Hanford Tank Farm Operations was commissioned by the Assistant Secretary for Environmental Restoration and Waste Management on November 1, 1991. The Independent Technical Assessment team conducted on-site interviews and inspections during the following periods: November 18 to 22,1991; April 13 to 17; and April 27 to May 1, 1992. Westinghouse Hanford Company is the management and operating contractor for the Department of Energy at the Hanford site. The Hanford Tank Farm Operations consists of 177 underground storage tanks containing 61 million gallons of high-level radioactive mixed wastes from the chemical reprocessing of nuclear fuel. The Tank Farm Operations also includes associated transfer lines, ancillary equipment, and instrumentation. The Independent Technical Assessment of the Hanford Tank Farm Operations builds upon the prior assessments of the Hanford Waste Vitrification System and the Hanford Site Tank Waste Disposal Strategy.The objective of this technical assessment was to determine whether an integrated and sound program exists to manage the tank-waste storage and tankfarm operations consistent with the Assistant Secretary for Environmental Restoration and Waste Management's guidance of overall risk minimization. The scope of this review includes the organization, management, operation, planning, facilities, and mitigation of the safety-concerns of the Hanford Tank Waste Remediation System. The assessments presented in the body of this report are based on the detailed observations discussed in the appendices. When the assessments use the term ''Hanford'' as an organizational body it means DOE-RL and Westinghouse Hanford Company as a minimum, and in many instances all of the stake holders for the Hanford site

  16. Magnet operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1991-11-01

    This report presents a review of magnet operating experiences for normal-conducting and superconducting magnets from fusion, particle accelerator, medical technology, and magnetohydrodynamics research areas. Safety relevant magnet operating experiences are presented to provide feedback on field performance of existing designs and to point out the operational safety concerns. Quantitative estimates of magnet component failure rates and accident event frequencies are also presented, based on field experience and on performance of similar components in other industries

  17. Transportation System Concept of Operations

    Energy Technology Data Exchange (ETDEWEB)

    N. Slater-Thompson

    2006-08-16

    The Nuclear Waste Policy Act of 1982 (NWPA), as amended, authorized the DOE to develop and manage a Federal system for the disposal of SNF and HLW. OCRWM was created to manage acceptance and disposal of SNF and HLW in a manner that protects public health, safety, and the environment; enhances national and energy security; and merits public confidence. This responsibility includes managing the transportation of SNF and HLW from origin sites to the Repository for disposal. The Transportation System Concept of Operations is the core high-level OCRWM document written to describe the Transportation System integrated design and present the vision, mission, and goals for Transportation System operations. By defining the functions, processes, and critical interfaces of this system early in the system development phase, programmatic risks are minimized, system costs are contained, and system operations are better managed, safer, and more secure. This document also facilitates discussions and understanding among parties responsible for the design, development, and operation of the Transportation System. Such understanding is important for the timely development of system requirements and identification of system interfaces. Information provided in the Transportation System Concept of Operations includes: the functions and key components of the Transportation System; system component interactions; flows of information within the system; the general operating sequences; and the internal and external factors affecting transportation operations. The Transportation System Concept of Operations reflects OCRWM's overall waste management system policies and mission objectives, and as such provides a description of the preferred state of system operation. The description of general Transportation System operating functions in the Transportation System Concept of Operations is the first step in the OCRWM systems engineering process, establishing the starting point for the lower

  18. Operational Readiness Review Plan for the Radioisotope Thermoelectric Generator Materials Production Tasks

    Science.gov (United States)

    Cooper, R. H.; Martin, M. M.; Riggs, C. R.; Beatty, R. L.; Ohriner, E. K.; Escher, R. N.

    1990-04-19

    In October 1989, a US shuttle lifted off from Cape Kennedy carrying the spacecraft Galileo on its mission to Jupiter. In November 1990, a second spacecraft, Ulysses, will be launched from Cape Kennedy with a mission to study the polar regions of the sun. The prime source of power for both spacecraft is a series of radioisotope thermoelectric generators (RTGs), which use plutonium oxide (plutonia) as a heat source. Several of the key components in this power system are required to ensure the safety of both the public and the environment and were manufactured at Oak Ridge National Laboratory (ORNL) in the 1980 to 1983 period. For these two missions, Martin Marietta Energy Systems, Inc. (Energy Systems), will provide an iridium alloy component used to contain the plutonia heat source and a carbon composite material that serves as a thermal insulator. ORNL alone will continue to fabricate the carbon composite material. Because of the importance to DOE that Energy Systems deliver these high quality components on time, performance of an Operational Readiness Review (ORR) of these manufacturing activities is necessary. Energy Systems Policy GP 24 entitled "Operational Readiness Process" describes the formal and comprehensive process by which appropriate Energy Systems activities are to be reviewed to ensure their readiness. This Energy System policy is aimed at reducing the risks associated with mission success and requires a management approved "readiness plan" to be issued. This document is the readiness plan for the RTG materials production tasks.

  19. Improved production operating efficiencies through automation: Wascana Energy`s SCADA system implementation in southeast Saskatchewan

    Energy Technology Data Exchange (ETDEWEB)

    Knudsen, R; Foord, T; Bartle, A

    1996-12-31

    Supervisory control and data acquisition (SCADA) systems covering Wascana Energy`s whole southeast Saskatchewan operating area were implemented in 1994-95. The benefits of this automation were described. Operations practices were reviewed and a brief description of the system was provided. Main features of the system described included data storage/retrieval, data display, alarm group organization, alarm call out monitoring, dynagraph display, and the Microsoft SQL server computer. Automation was found to significantly change the operator`s traditional role and altered operation practices in general. SCADA systems were found to improve operating efficiencies and production performance significantly, when properly implemented and utilized. 6 refs., 3 figs.

  20. Advanced launch system (ALS) - Electrical actuation and power systems improve operability and cost picture

    Science.gov (United States)

    Sundberg, Gale R.

    1990-01-01

    To obtain the Advanced Launch System (ALS) primary goals of reduced costs and improved operability, there must be significant reductions in the launch operations and servicing requirements relative to current vehicle designs and practices. One of the primary methods for achieving these goals is by using vehicle electrrical power system and controls for all aviation and avionics requirements. A brief status review of the ALS and its associated Advanced Development Program is presented to demonstrate maturation of those technologies that will help meet the overall operability and cost goals. The electric power and actuation systems are highlighted as a sdpecific technology ready not only to meet the stringent ALS goals (cryogenic field valves and thrust vector controls with peak power demands to 75 hp), but also those of other launch vehicles, military ans civilian aircraft, lunar/Martian vehicles, and a multitude of comercial applications.

  1. Advanced Launch System (ALS): Electrical actuation and power systems improve operability and cost picture

    Science.gov (United States)

    Sundberg, Gale R.

    1990-01-01

    To obtain the Advanced Launch System (ALS) primary goals of reduced costs and improved operability, there must be significant reductions in the launch operations and servicing requirements relative to current vehicle designs and practices. One of the primary methods for achieving these goals is by using vehicle electrical power system and controls for all actuation and avionics requirements. A brief status review of the ALS and its associated Advanced Development Program is presented to demonstrate maturation of those technologies that will help meet the overall operability and cost goals. The electric power and actuation systems are highlighted as a specific technology ready not only to meet the stringent ALS goals (cryogenic field valves and thrust vector controls with peak power demands to 75 hp), but also those of other launch vehicles, military and civilian aircraft, lunar/Martian vehicles, and a multitude of commercial applications.

  2. Review of relevant studies of isolated systems

    DEFF Research Database (Denmark)

    Hansen, L.H.; Lundsager, P.

    2001-01-01

    The report presents the results of a review of studies relating to integration of wind energy in isolated power supply systems, based on a systematic literature survey. The purpose of the study is to develop a methodology consisting of a set of guidelinesfor wind energy projects in isolated energy...... systems and a set of tools and models that are operational on an engineering level. The review is based on a literature search in the ETDE Energy Database with a main search covering the period 7/88 to 6/97 andsupplemented by partial update periods. A few newer references have been included in the review...... have been organised according to the following keywords: methods & guides, economics, concept ofapplication, system solutions, case studies, financial programmes, dedicated software tools. None of the found references presents methods or tools that contradict the philosophy of Risø's methodology...

  3. Decentralization of operating reactor licensing reviews: NRR Pilot Program

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1984-07-01

    This report, which has incorporated comments received from the Commission and ACRS, describes the program for decentralization of selected operating reactor licensing technical review activities. The 2-year pilot program will be reviewed to verify that safety is enhanced as anticipated by the incorporation of prescribed management techniques and application of resources. If the program fails to operate as designed, it will be terminated

  4. 7 CFR 3415.10 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups... ASSESSMENT RESEARCH GRANTS PROGRAM Scientific Peer Review of Research Grant Applications § 3415.10 Establishment and operation of peer review groups. Subject to § 3415.5, the Administrator shall adopt procedures...

  5. 7 CFR 3400.10 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups... GRANTS PROGRAM Scientific Peer Review of Research Grant Applications § 3400.10 Establishment and operation of peer review groups. Subject to § 3400.5, the Administrator will adopt procedures for the...

  6. 7 CFR 3401.12 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups... GRANTS PROGRAM Scientific Peer Review of Research Applications for Funding § 3401.12 Establishment and operation of peer review groups. Subject to § 3401.7, the Administrator will adopt procedures for the...

  7. 7 CFR 3411.10 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups... INITIATIVE COMPETITIVE GRANTS PROGRAM Scientific Peer Review of Research Grant Applications § 3411.10 Establishment and operation of peer review groups. Subject to § 3411.5, the Administrator shall adopt procedures...

  8. Operating system MINIX

    OpenAIRE

    JIRKŮ, Radek

    2012-01-01

    This thesis introduces readers to the MINIX operating system, which was used in the creation of the Linux OS. It discusses the history and development of the system and explains its core and the file system. Also solves MINIX installation and configuration of the virtual machine at each step and deals with disputes that had a creator of Minix creator of Linux. In conclusion, compared with Linux MINIX and summarizes the advantages and disadvantages and the use of the operating system at present.

  9. Microkernel operating systems

    OpenAIRE

    Rudić, Ratko

    2016-01-01

    This thesis outlines history, development and design of microkernel based operating systems. While the idea of microkernel based architecture emerged early in computer science, there are still very few systems adopting this technology. Microkernel operating systems are divided into several different groups and families that frequently share rules, design decisions and development processes. This master thesis focuses on the main representatives of these groups as well as their mutual...

  10. High-Performance Operating Systems

    DEFF Research Database (Denmark)

    Sharp, Robin

    1999-01-01

    Notes prepared for the DTU course 49421 "High Performance Operating Systems". The notes deal with quantitative and qualitative techniques for use in the design and evaluation of operating systems in computer systems for which performance is an important parameter, such as real-time applications......, communication systems and multimedia systems....

  11. IAEA Operational Safety Team Reviews Cattenom Nuclear Power Plant

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts led by the International Atomic Energy Agency (IAEA) has reviewed operational safety at France's Cattenom Nuclear Power Plant (NPP) noting a series of good practices as well as recommendations and suggestions to reinforce them. The IAEA assembled an international team of experts at the request of the Government of France to conduct an Operational Safety Review (OSART) of Cattenom NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 14 November to 1 December 2011. The team was made up of experts from Belgium, the Czech Republic, Finland, Germany, Hungary, Japan, Russia, Slovakia, South Africa, Sweden, Ukraine, the United Kingdom and the IAEA. The team at Cattenom conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; Emergency Planning and Preparedness; and Severe Accident Management. Cattenom is the first plant in Europe to voluntarily undertake a Severe Accident Management review during an OSART review. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: Sheets are displayed in storage areas where combustible material is present - these sheets are updated readily and accurately by the area owner to ensure that the fire limits are complied with; A simple container is attached to the neutron source handling device to ensure ease and safety of operations and reduce possible radiation exposure during use

  12. Operating experience feedback report -- turbine-generator overspeed protection systems: Commercial power reactors. Volume 11

    International Nuclear Information System (INIS)

    Ornstein, H.L.

    1995-04-01

    This report presents the results of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) review of operating experience of main turbine-generator overspeed and overspeed protection systems. It includes an indepth examination of the turbine overspeed event which occurred on November 9, 1991, at the Salem Unit 2 Nuclear Power Plant. It also provides information concerning actions taken by other utilities and the turbine manufacturers as a result of the Salem overspeed event. AEOD's study reviewed operating procedures and plant practices. It noted differences between turbine manufacturer designs and recommendations for operations, maintenance, and testing, and also identified significant variations in the manner that individual plants maintain and test their turbine overspeed protection systems. AEOD's study provides insight into the shortcomings in the design, operation, maintenance, testing, and human factors associated with turbine overspeed protection systems. Operating experience indicates that the frequency of turbine overspeed events is higher than previously thought and that the bases for demonstrating compliance with NRC's General Design Criterion (GDC) 4, Environmental and dynamic effects design bases, may be nonconservative with respect to the assumed frequency

  13. The District Health Information System (DHIS2): A literature review and meta-synthesis of its strengths and operational challenges based on the experiences of 11 countries.

    Science.gov (United States)

    Dehnavieh, Reza; Haghdoost, AliAkbar; Khosravi, Ardeshir; Hoseinabadi, Fahime; Rahimi, Hamed; Poursheikhali, Atousa; Khajehpour, Nahid; Khajeh, Zahra; Mirshekari, Nadia; Hasani, Marziyeh; Radmerikhi, Samera; Haghighi, Hajar; Mehrolhassani, Mohammad Hossain; Kazemi, Elaheh; Aghamohamadi, Saeide

    2018-01-01

    Health information systems offer many potential benefits for healthcare, including financial benefits and for improving the quality of patient care. The purpose of District Health Information Systems (DHIS) is to document data that are routinely collected in all public health facilities in a country using the system. The aim of this study was to examine the strengths and operational challenges of DHIS2, with a goal to enable decision makers in different counties to more accurately evaluate the outcomes of introducing DHIS2 into their particular country. A review of the literature combined with the method of meta-synthesis was used to source information and interpret results relating to the strengths and operational challenges of DHIS2. Databases (Embase, PubMed, Scopus and Google Scholar) were searched for documents related to strengths and operational challenges of DHIS2, with no time limit up to 8 April 2017. The review and evaluation of selected studies was conducted in three stages: title, abstract and full text. Each of the selected studies was reviewed carefully and key concepts extracted. These key concepts were divided into two categories of strengths and operational challenges of DHIS2. Then, each category was grouped based on conceptual similarity to achieve the main themes and sub-themes. Content analysis was used to analyse extracted data. Of 766 identified citations, 20 studies from 11 countries were included and analysed in this study. Identified strengths in the DHIS were represented in seven themes (with 21 categories): technical features of software, proper management of data, application flexibility, networking and increasing the satisfaction of stakeholders, development of data management, increasing access to information and economic benefits. Operational challenges were identified and captured in 11 themes (with 18 categories): funds; appropriate communication infrastructure; the need for the existence of appropriate data; political, cultural

  14. A Psychodynamic Systems Perspective on Command Relationship during Combat Operations

    Science.gov (United States)

    2017-06-09

    Hasselager, Wilfred Bion, Bent Jorgensen, Defensive Mechanisms, Assumption Groups , Psychodynamic System Theory . 16. SECURITY CLASSIFICATION OF: 17...LITERATURE REVIEW Introduction The purpose of this chapter is to give the reader a detailed overview of the theories used as a foundation for the analysis...conclusion, psychodynamic system theory can be visually represented as the two operating levels of the group with an external boundary to the

  15. Disc operational system

    International Nuclear Information System (INIS)

    Veretenov, V.Yu.; Volkov, A.I.; Gurevich, M.I.; Kozik, V.S.; Pod'yachev, E.I.; Shapiro, M.L.

    1974-01-01

    A disc operational system is proposed, which is based on the file structure and designed for use in a BESM-6 computer with the software system comprising a dispatcher DD-73 and a monitor 'Dubna'. The main distinguishing feature of the disc operational system is the decentralization of the file system. Each disc package is an independent file unaffected by the state of the other disc packages. The use of several disc packages is allowed. The above feature of the disc operational system makes it possible to simplify the language of communication with the system, to give the user the opportunity of controlling the file quite independently, and to simplify the maintenance of the discs by the computer personnel. One and the same disc can be simultaneously addressed by all problems in the processor (both mathematical and service). A single file, however, may be used in the recording mode by only one problem. The description presented is the instruction for users. It also describes special possibilities open to the system programmers [ru

  16. SALTO guidelines. Guidelines for peer review of long term operation and ageing management of nuclear power plants

    International Nuclear Information System (INIS)

    2008-01-01

    The average age of nuclear power plants (NPPs) connected to the grid worldwide is increasing. About 20% of all the power reactors operating worldwide have been in operation for more than 30 years, and almost 50% have been in operation for 20 to 30 years, while a rather limited number of new NPPs are being put into operation. In view of this trend, many countries are giving a high priority to continuing the operation of NPPs beyond the time frame originally anticipated (e.g. 30 or 40 years). Long term operation (LTO) for NPPs is operation beyond the established time frame originally set forth by the license term, design limits, standards or regulations. LTO needs to be justified by a safety assessment considering life limiting processes and features for structures, systems and components. Proper and safe LTO is based on the experience and practices of various countries in areas such as plant license renewal, life extension, continued operation and life management. Other activities, including periodic safety review, ageing management and plant modification, are also relevant to LTO. Ageing management of an NPP is an important activity that must be considered before and in conjunction with the decision to enter LTO. Ageing management of NPPs deals with the physical ageing of structures, systems and components (SSCs) that can result in the degradation of their performance characteristics. Thus ageing management helps ensure that SSCs important to safety remain capable of performing their required safety functions. An effective ageing management programme (AMP) is a key element of the safe and reliable operation of NPPs during the originally planned time frame originally planned for their operation, as well as for the period of LTO. In order to assist Member States in managing ageing effectively, the IAEA is developing related safety standards and guidance publications. International peer review is a useful tool for Member States to exchange experience, learn from each

  17. How operational issues impact science peer review

    Science.gov (United States)

    Blacker, Brett S.; Golombek, Daniel; Macchetto, Duccio

    2006-06-01

    In some eyes, the Phase I proposal selection process is the most important activity handled by the Space Telescope Science Institute (STScI). Proposing for HST and other missions consists of requesting observing time and/or archival research funding. This step is called Phase I, where the scientific merit of a proposal is considered by a community based peer-review process. Accepted proposals then proceed thru Phase II, where the observations are specified in sufficient detail to enable scheduling on the telescope. Each cycle the Hubble Space Telescope (HST) Telescope Allocation Committee (TAC) reviews proposals and awards observing time that is valued at $0.5B, when the total expenditures for HST over its lifetime are figured on an annual basis. This is in fact a very important endeavor that we continue to fine-tune and tweak. This process is open to the science community and we constantly receive comments and praise for this process. In this last year we have had to deal with the loss of the Space Telescope Imaging Spectrograph (STIS) and move from 3-gyro operations to 2-gyro operations. This paper will outline how operational issues impact the HST science peer review process. We will discuss the process that was used to recover from the loss of the STIS instrument and how we dealt with the loss of 1/3 of the current science observations. We will also discuss the issues relating to 3-gyro vs. 2-gyro operations and how that changes impacted Proposers, our in-house processing and the TAC.

  18. Post-operative telephone review is cost-effective and acceptable to patients.

    LENUS (Irish Health Repository)

    Gray, R T

    2012-02-01

    INTRODUCTION: Patients undergoing selective minor emergency and elective procedures are followed up by a nurse-led structured telephone review six weeks post-operatively in our hospital. Our study objectives were to review patients\\' satisfaction, assess cost-effectiveness and compare our practice with other surgical units in Northern Ireland (NI). PATIENTS AND METHODS: Completed telephone follow-up forms were reviewed retrospectively for a three-year period and cost savings calculated. Fifty patients were contacted prospectively by telephone using a questionnaire to assess satisfaction of this follow-up. A postal questionnaire was sent to 68 general and vascular surgeons in NI, assessing individual preferences for patient follow-up. RESULTS: A total of 1378 patients received a telephone review from September 2005 to September 2008. One thousand one hundred and seventy-seven (85.4%) were successfully contacted, while 201 (14.6%) did not respond despite multiple attempts. One hundred and forty-seven respondents (10.7%) required further outpatient follow-up, thereby saving 1231 outpatient reviews, equivalent to pound41,509 per annum. Thirty-nine (78%) patients expected post-operative follow-up, with 29 (58%) expecting this in the outpatient department. However, all patients were satisfied with the nurse-led telephone review. Fifty-three (78%) consultants responded. Those who always, or occasionally, review patients post-operatively varies according to the operation performed, ranging from 2.2% appendicectomy patients to 40.0% for varicose vein surgery. CONCLUSION: Current practice in NI varies, but a significant proportion of patients are not routinely reviewed. This study confirmed that patients expect post-operative follow-up. A nurse-led telephone review service is acceptable to patients, cost-effective and reduces the number of unnecessary outpatient reviews.

  19. A Multiprocessor Operating System Simulator

    Science.gov (United States)

    Johnston, Gary M.; Campbell, Roy H.

    1988-01-01

    This paper describes a multiprocessor operating system simulator that was developed by the authors in the Fall semester of 1987. The simulator was built in response to the need to provide students with an environment in which to build and test operating system concepts as part of the coursework of a third-year undergraduate operating systems course. Written in C++, the simulator uses the co-routine style task package that is distributed with the AT&T C++ Translator to provide a hierarchy of classes that represents a broad range of operating system software and hardware components. The class hierarchy closely follows that of the 'Choices' family of operating systems for loosely- and tightly-coupled multiprocessors. During an operating system course, these classes are refined and specialized by students in homework assignments to facilitate experimentation with different aspects of operating system design and policy decisions. The current implementation runs on the IBM RT PC under 4.3bsd UNIX.

  20. Computer system operation

    International Nuclear Information System (INIS)

    Lee, Young Jae; Lee, Hae Cho; Lee, Ho Yeun; Kim, Young Taek; Lee, Sung Kyu; Park, Jeong Suk; Nam, Ji Wha; Kim, Soon Kon; Yang, Sung Un; Sohn, Jae Min; Moon, Soon Sung; Park, Bong Sik; Lee, Byung Heon; Park, Sun Hee; Kim, Jin Hee; Hwang, Hyeoi Sun; Lee, Hee Ja; Hwang, In A.

    1993-12-01

    The report described the operation and the trouble shooting of main computer and KAERINet. The results of the project are as follows; 1. The operation and trouble shooting of the main computer system. (Cyber 170-875, Cyber 960-31, VAX 6320, VAX 11/780). 2. The operation and trouble shooting of the KAERINet. (PC to host connection, host to host connection, file transfer, electronic-mail, X.25, CATV etc.). 3. The development of applications -Electronic Document Approval and Delivery System, Installation the ORACLE Utility Program. 22 tabs., 12 figs. (Author) .new

  1. Computer system operation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Young Jae; Lee, Hae Cho; Lee, Ho Yeun; Kim, Young Taek; Lee, Sung Kyu; Park, Jeong Suk; Nam, Ji Wha; Kim, Soon Kon; Yang, Sung Un; Sohn, Jae Min; Moon, Soon Sung; Park, Bong Sik; Lee, Byung Heon; Park, Sun Hee; Kim, Jin Hee; Hwang, Hyeoi Sun; Lee, Hee Ja; Hwang, In A [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    The report described the operation and the trouble shooting of main computer and KAERINet. The results of the project are as follows; 1. The operation and trouble shooting of the main computer system. (Cyber 170-875, Cyber 960-31, VAX 6320, VAX 11/780). 2. The operation and trouble shooting of the KAERINet. (PC to host connection, host to host connection, file transfer, electronic-mail, X.25, CATV etc.). 3. The development of applications -Electronic Document Approval and Delivery System, Installation the ORACLE Utility Program. 22 tabs., 12 figs. (Author) .new.

  2. NRC perspectives on the digital system review process

    International Nuclear Information System (INIS)

    Mauck, J.L.

    1998-01-01

    Since about 1988, the USNRC has been involved in the review of digital retrofits to instrumentation and control (I and C) systems in nuclear power plants. Initially, this involvement was limited but with the advent of the 1990s, NRC involvement has become greater because of increased interest in and application of digital systems as existing analog systems become obsolete. Criteria for the design of such systems to ensure safety has been promulgated over the years and the USNRC has been actively involved both nationally and internationally with this effort. With the publication of the Zion Eagle 21 Safety Evaluation Report in 1992, Generic Letter 95-02 in April 1995 which endorses EPRI guidance document TR-102348 on digital upgrades and the latest revision to Regulatory Guide 1.152 which endorses IEEE 7.4.3.2-1993; a basic digital system review process was established. The NRC supplemented this review process with recently issued inspection procedures for use by NRC inspectors when conducting onsite reviews of digital modifications. In addition, the NRC undertook a major effort to codify the above guidance and the experience gained from digital system reviews of both operating plant modifications and advanced reactor designs, over these years into a revision to Standard Review Plan, (SRP), NUREG-0800, Chapter 7, Instrumentation and Control. This SRP revision was published in June, 1997, and included new SRP sections, branch technical positions and six new regulatory guides endorsing IEEE standards on software quality. The NRC staff believes that a stable digital system review process is now in place. (author)

  3. An expert system-based aid for analysis of Emergency Operating Procedures in NPPs

    International Nuclear Information System (INIS)

    Jakubowski, Z.; Beraha, D.

    1996-01-01

    Emergency Operating Procedures (EOPs) generally and an accident management (AM) particularly play a significant part in the safety philosophy on NPPs since many years. A better methodology for development and validation of EOPs is desired. A prototype of an Emergency Operating Procedures Analysis System (EOPAS), which has been developed at GRS, is presented in the paper. The hardware configuration and software organisation of the system is briefly reviewed. The main components of the system such as the knowledge base of an expert system and the engineering simulator are described. (author)

  4. The embedded operating system project

    Science.gov (United States)

    Campbell, R. H.

    1984-01-01

    This progress report describes research towards the design and construction of embedded operating systems for real-time advanced aerospace applications. The applications concerned require reliable operating system support that must accommodate networks of computers. The report addresses the problems of constructing such operating systems, the communications media, reconfiguration, consistency and recovery in a distributed system, and the issues of realtime processing. A discussion is included on suitable theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based systems. In particular, this report addresses: atomic actions, fault tolerance, operating system structure, program development, reliability and availability, and networking issues. This document reports the status of various experiments designed and conducted to investigate embedded operating system design issues.

  5. Operational experience review and methods to enhance safety and reliability in the NPP-Leibstadt (KKL)

    Energy Technology Data Exchange (ETDEWEB)

    Haeusermann, R [Kernkraftwerk Leibstadt AG, Leibstadt (Switzerland)

    1997-10-01

    In the nuclear community it became clear that an integrated feedback system of operating experience must also include the unsuccessful results. The deviations, expected to achieved performance are analysed to the failure mode and its effect. KKL has lowered the number of safety significant events since commercial operation started. The thoroughness of the review/analysis of the events has increased with high priority set to human factor induced events in operation and maintenance. Since the participation of the author in the ASSET-Mission in Smolensk in 1993, KKL introduced the ASSET-Root-Cause method and has supplemented it by the HPES (Human Performance Enhancement System). 4 refs, 6 figs.

  6. Operational experience review and methods to enhance safety and reliability in the NPP-Leibstadt (KKL)

    International Nuclear Information System (INIS)

    Haeusermann, R.

    1997-01-01

    In the nuclear community it became clear that an integrated feedback system of operating experience must also include the unsuccessful results. The deviations, expected to achieved performance are analysed to the failure mode and its effect. KKL has lowered the number of safety significant events since commercial operation started. The thoroughness of the review/analysis of the events has increased with high priority set to human factor induced events in operation and maintenance. Since the participation of the author in the ASSET-Mission in Smolensk in 1993, KKL introduced the ASSET-Root-Cause method and has supplemented it by the HPES (Human Performance Enhancement System). 4 refs, 6 figs

  7. SPECTR System Operational Test Report

    International Nuclear Information System (INIS)

    Landman, W.H. Jr.

    2011-01-01

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  8. Learning from aviation to improve safety in the operating room - a systematic literature review

    NARCIS (Netherlands)

    L.S.G.L. Wauben; J.F. Lange (Johan); R.H.M. Goossens (Richard)

    2012-01-01

    textabstractLessons learned from other high-risk industries could improve patient safety in the operating room (OR). This review describes similarities and differences between high-risk industries and describes current methods and solutions within a system approach to reduce errors in the OR. PubMed

  9. The work of the Operational Safety Review Team (OSART)

    International Nuclear Information System (INIS)

    Hide, K.W.

    1996-01-01

    The Operational Safety Review Team (OSART) programme was set up by the IAEA in 1982 to assist Member States to enhance the operational safety of nuclear power plants. Each team is staffed by senior experts in the relevant fields. The review team discusses with plant staff the existing operational programmes for plant which may be under construction, being commissioned or already operating. Following a detailed examination of a safety programme, the OSART team lists strengths and weaknesses and makes recommendations on how to overcome the latter. Since their conclusions are based on the best prevailing international practice, they may be more stringent than those based on national criteria. The results of the 77 missions conducted at 62 plants in 28 countries by the end of 1994 are summarised. (UK)

  10. Initial operation and performance of the PDX neutral-beam injection system

    International Nuclear Information System (INIS)

    Kugel, H.W.; Eubank, H.P.; Kozub, T.A.; Rossmassler, J.E.; Schilling, G.; van Halle, A.; Williams, M.D.

    1982-01-01

    In 1981, the joint ORNL/PPPL PDX neutral beam heating project succeeded in reliably injecting 7.2 MW of D 0 into the PDX plasma, at nearly perpendicular angles, and achieved ion temperatures up to 6.5 keV. The expeditious achievement of this result was due to the thorough conditioning and qualification of the PDX neutral beam ion sources at ORNL prior to delivery coupled with several field design changes and improvements in the injection system made at PPPL as a result of neutral beam operating experience with the PLT tokamak. It has been found that the operation of high power neutral beam injection systems in a tokamak-neutral beam environment requires procedures and performance different from those required for development operation on test stands. In this paper, we review the installatin of the PDX neutral beam injection system, and its operation and performance during the initial high power plasma heating experiments with the PDX tokamak

  11. The design of intelligent support systems for nuclear reactor operators

    International Nuclear Information System (INIS)

    Bernard, J.A.

    1992-01-01

    This paper identifies factors relevant to the design of intelligent support systems and their use for the provision of real-time diagnostic information. As such, it constitutes a followup to the state-of-the-art review that was previously published by Bernard and Washio on the utilization of expert systems within the nuclear industry. Some major differences between intelligent-support tools and conventional expert systems are enumerated. In summary, conventional expert systems that encode experimental knowledge in production rules are not suitable vehicle for the creation of operator support systems. The principal difficulty is the need for real-time operation. This in turn means that intelligent support systems will have knowledge bases derived from temporally accurate plant models, inference engines that permit revisions in the search process to accommodate revised data, and man-machine interfaces that do not require any human input. Such systems will be heavily instrumented, and the associated knowledge bases will require a hierarchical organization to emulate human approaches to analysis

  12. Energy Efficient Mobile Operating Systems

    OpenAIRE

    Muhammad Waseem

    2013-01-01

    Energy is an important resource in mobile computers now days. It is important to manage energy in efficient manner so that energy consumption will be reduced. Developers of operating system decided to increase the battery life time of mobile phones at operating system level. So, design of energy efficient mobile operating system is the best way to reduce the energy consumption in mobile devices. In this paper, currently used energy efficient mobile operating system is discussed and compared. ...

  13. Operating System for Runtime Reconfigurable Multiprocessor Systems

    Directory of Open Access Journals (Sweden)

    Diana Göhringer

    2011-01-01

    Full Text Available Operating systems traditionally handle the task scheduling of one or more application instances on processor-like hardware architectures. RAMPSoC, a novel runtime adaptive multiprocessor System-on-Chip, exploits the dynamic reconfiguration on FPGAs to generate, start and terminate hardware and software tasks. The hardware tasks have to be transferred to the reconfigurable hardware via a configuration access port. The software tasks can be loaded into the local memory of the respective IP core either via the configuration access port or via the on-chip communication infrastructure (e.g. a Network-on-Chip. Recent-series of Xilinx FPGAs, such as Virtex-5, provide two Internal Configuration Access Ports, which cannot be accessed simultaneously. To prevent conflicts, the access to these ports as well as the hardware resource management needs to be controlled, e.g. by a special-purpose operating system running on an embedded processor. For that purpose and to handle the relations between temporally and spatially scheduled operations, the novel approach of an operating system is of high importance. This special purpose operating system, called CAP-OS (Configuration Access Port-Operating System, which will be presented in this paper, supports the clients using the configuration port with the services of priority-based access scheduling, hardware task mapping and resource management.

  14. Development of safety review advisory system for nuclear power plants

    International Nuclear Information System (INIS)

    Kim, M. W.; Lee, H. C.; Park, S. O.; Park, W. J.; Lee, J. I.; Hur, K. Y.; Choi, S. S.; Lee, S. J.; Kang, C. M.

    2001-01-01

    For the development of an expert system supporting the safety review of nuclear power plants, the application program was implemented after gathering necessary theoretical background and practical requirements. The general and the detail functional specifications were established, and they were investigated by the safety review experts at KINS. Safety Review Advisory System (SRAS), the windows application on client-server environment was developed according to the above specifications. Reviewers can do their safety reviewing regardless of speciality or reviewing experiences because SRAS is operated by the safety review plans which are converted to standardized format. When the safety reviewing is carried out by using SRAS, the results of safety reviewing are accumulated in the database and may be utilized later usefully, and we can grasp safety reviewing progress. Users of SRAS are categorized into three groups, administrator, project manager, and reviewer. Each user group has appropriate access capability. The function and some screen shots of SRAS are described in this paper

  15. SALTO Peer Review Guidelines. Guidelines for Peer Review of Safety Aspects of Long Term Operation of Nuclear Power Plants

    International Nuclear Information System (INIS)

    2014-01-01

    International peer review is a useful tool for Member States to exchange experiences, learn from each other and apply good practices in the long term operation (LTO) of nuclear power plants (NPPs). The peer review is also an important mechanism through which the IAEA supports Member States in enhancing the safety of NPPs. The IAEA has conducted various types of safety review that indirectly address aspects of LTO, including safety reviews for design, engineering, operation and external hazards. Operational Safety Review Team (OSART) services include review of ageing management programmes. In addition, several Member States have requested Ageing Management Assessment Team (AMAT) missions. Through these experiences, it was recognized that a comprehensive peer review on LTO would be very useful to Member States. The Safety Aspects of Long Term Operation (SALTO) peer review addresses strategy and key elements for the safe LTO of NPPs, which includes AMAT objectives and complements OSART reviews. The SALTO peer review is designed to assist operating organizations in adopting a proper approach to LTP including implementing appropriate activities to ensure that plant safety will be maintained during the LTO period. The SALTO peer review can be tailored to focus on ageing management programmes (AMPs) or on other activities related to LTO to support the Member State in enhancing the safety of its NPPs. The SALTO peer review can also support regulators in establishing or improving regulatory and licensing strategies for the LTO of NPPs. The guidelines in this publication are primarily intended for members of a SALTO review team and provide a basic structure and common reference for peer reviews of LTO. Additionally, the guidelines also provide useful information to the operating organizations of NPPs (or technical support organizations) for carrying out their own self-assessments or comprehensive programme reviews. The guidelines are intended to be generic, as there are

  16. Operating experience review for the AP1000 plant

    International Nuclear Information System (INIS)

    Chaney, T. E.; Lipner, M. H.

    2006-01-01

    Westinghouse is performing an update to the Operating Experience Review (OER) Report for the AP1000 project to account for operating experience since December 1996. Significant Operating Experience Reports, Significant Event Reports, Significant Event Notifications, Operations and Maintenance Reminders, Topical Reports, Event Analysis Reports and Licensee Event Reports were researched for pertinent input to the update. As a part of the OER, Westinghouse has also conducted operator interviews and observations during simulated plant operations and after operating events. The main purpose of the OER is to identify Human Factors Engineering (HFE) related safety issues from existing operating plant experience and to ensure that these issues are addressed in the new design. The issues and lessons learned regarding operating experience provide a basis for improving the plant design. (authors)

  17. 42 CFR 52h.3 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Establishment and operation of peer review groups... GRANTS SCIENTIFIC PEER REVIEW OF RESEARCH GRANT APPLICATIONS AND RESEARCH AND DEVELOPMENT CONTRACT PROJECTS § 52h.3 Establishment and operation of peer review groups. (a) To the extent applicable, the...

  18. A review on the sustainability of constructed wetlands for wastewater treatment: Design and operation.

    Science.gov (United States)

    Wu, Haiming; Zhang, Jian; Ngo, Huu Hao; Guo, Wenshan; Hu, Zhen; Liang, Shuang; Fan, Jinlin; Liu, Hai

    2015-01-01

    Constructed wetlands (CWs) have been used as a green technology to treat various wastewaters for several decades. CWs offer a land-intensive, low-energy, and less-operational-requirements alternative to conventional treatment systems, especially for small communities and remote locations. However, the sustainable operation and successful application of these systems remains a challenge. Hence, this paper aims to provide and inspire sustainable solutions for the performance and application of CWs by giving a comprehensive review of CWs' application and the recent development on their sustainable design and operation for wastewater treatment. Firstly, a brief summary on the definition, classification and application of current CWs was presented. The design parameters and operational conditions of CWs including plant species, substrate types, water depth, hydraulic load, hydraulic retention time and feeding mode related to the sustainable operation for wastewater treatments were then discussed. Lastly, future research on improving the stability and sustainability of CWs were highlighted. Copyright © 2014 Elsevier Ltd. All rights reserved.

  19. The embedded operating system project

    Science.gov (United States)

    Campbell, R. H.

    1985-01-01

    The design and construction of embedded operating systems for real-time advanced aerospace applications was investigated. The applications require reliable operating system support that must accommodate computer networks. Problems that arise in the construction of such operating systems, reconfiguration, consistency and recovery in a distributed system, and the issues of real-time processing are reported. A thesis that provides theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based system is included. The following items are addressed: (1) atomic actions and fault-tolerance issues; (2) operating system structure; (3) program development; (4) a reliable compiler for path Pascal; and (5) mediators, a mechanism for scheduling distributed system processes.

  20. 21 CFR 111.113 - What quality control operations are required for a material review and disposition decision?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for a... Production and Process Control System: Requirements for Quality Control § 111.113 What quality control operations are required for a material review and disposition decision? (a) Quality control personnel must...

  1. ITER task D316 (1996): design review of isotope separation system (WBS 3.2 B) and water detritiation system (WBS 3.2 E)

    International Nuclear Information System (INIS)

    Sood, S.K.; Fong, C.

    1997-05-01

    The design review performed on the ITER Isotope Separation System and the Water Detritiation System are summarized. The objectives of the task are: to produce a Design Description Document for the Feed Treatment and Vacuum system for the Water Detritiation system; to review the process system operation and control philosophy for the Water Detritiation System; to review the equipment arrangement drawings where available. 1 fig., 3 refs

  2. Development of autonomous operation system

    International Nuclear Information System (INIS)

    Endou, Akira; Watanabe, Kenshiu; Miki, Tetsushi

    1992-01-01

    To enhance operation reliability of nuclear plants by removing human factors, study on an autonomous operation system has been carried out to substitute artificial intelligence (AI) for plant operators and, in addition, traditional controllers used in existing plants. For construction of the AI system, structurization of knowledge on the basis of the principles such as physical laws, function and structure of relevant objects and generalization of problem solving process are intended. A hierarchical distributed cooperative system configuration in employed because it is superior from the viewpoint of dynamical reorganization of system functions. This configuration is realized by an object-oriented multi-agent system. Construction of a prototype system was planned and the conceptual design was made for FBR plant in order to evaluate applicability of AI to the autonomous operation and to have a prospect for the realization of the system. The prototype system executes diagnosis, state evaluation, operation and control for the main plant subsystems. (author)

  3. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

  4. Operation auxiliary system (SAO)

    International Nuclear Information System (INIS)

    Lolich, J.; Santome, D.; Drexler, J.

    1990-01-01

    This work presents an auxiliary system for nuclear power plants operation (SAO). The development purpose consisted in a computing supervision system to be installed at different sites of a reactor, mainly in the control room. The inclusion of this system to a nuclear power plant minimizes the possibility of human error for the facility operation. (Author) [es

  5. A Common Definition of the System Operators' Core Activities[Electric Power Transmission System Operator

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-02-15

    In this report a common definition of the system operator's core activities in the Nordic countries is identified and also a list of non-core activities is introduced. As a starting point the common tasks for system responsibility as identified by Nordel has been used for the work. The term TSO (Transmission System Operator) is employed as a common denominator in the report. It is found out that the TSOs carry out common core activities in the roles as a transmission operator, a system operator and a balance settlement responsible. The core activities for the TSO as a transmission network operator are: Maintain the adequate transmission system in the long run and network development plan on the national as well as on the Nordic level using sophisticated analysis and planning methods and tools. Plan the transmission network on the national as well as on the Nordic level utilising new investments, renewal and maintenance of existing network components so that the network is secure to operate and adequate transmission capacity is guaranteed. Aim at timely network expansions using enhanced information exchange between the Nordic TSOs, and on the national level between the TSO and distribution and regional network operators, large consumers and large producers. Secure the technical compatibility with networks across the border and within a country by establishing connection requirements on the national level and ensuring that the national requirements are compatible across the Nordic power system. The core activities for the TSO as a system operator are: Define common technical requirements for the secure system operation using common planning, operation, connection and data exchange procedures. Secure the system operation with the operational planning for the following year by using information exchange between TSOs enabling the TSOs to make the best possible forecast of the global grid situation in order to assess the flows in their network and the available

  6. Outline of operation and control system and analytical investigation of transient behavior of an out-of-pile hydrogen production system for HTTR heat utilization system

    International Nuclear Information System (INIS)

    Inagaki, Yoshiyuki; Hada, Kazuhiko; Nishihara, Tetsuo; Takeda, Tetsuaki; Haga, Katsuhiro; Hino, Ryutaro.

    1997-10-01

    The hydrogen production system by steam reforming of natural gas is to be constructed to demonstrate effectiveness of high-temperature nuclear heat utilization systems with the HTTR. Prior to coupling of the steam reforming system with the HTTR, an out-of-pile test system is planned to investigate the system characteristics, to develop high-temperature components such as a reformer, a high-temperature isolation valve and so on, and to verify operation and control technologies and safety technology at accidents. This paper presents outline of operation and control systems and analytical review of transient behavior of the out-of-pile hydrogen production system. Main function of the operation and control systems is made not to give disturbance to the HTTR at transient state under start-up and stop operations. The operation modes are separated into two ones, namely normal and accident operation modes, and operation sequences are made for each operation mode. The normal operation sequence includes start-up, steady operation and stop of the out-of-pile system. The accident one deals with accident conditions at which supply of feed gas is stopped and helium gas is cooled passively by the steam generator. Transient behavior of the out-of-pile system was analyzed numerically according as the operation sequences. As the results, it was confirmed that the designed operation and control systems are adequate to the out-of-pile system. (author)

  7. 1987 DOE review: First collider run operation

    International Nuclear Information System (INIS)

    Childress, S.; Crawford, J.; Dugan, G.

    1987-05-01

    This review covers the operations of the first run of the 1.8 TeV superconducting super collider. The papers enclosed cover: PBAR source status, fixed target operation, Tevatron cryogenic reliability and capacity upgrade, Tevatron Energy upgrade progress and plans, status of the D0 low beta insertion, 1.8 K and 4.7 K refrigeration for low-β quadrupoles, progress and plans for the LINAC and booster, near term and long term and long term performance improvements

  8. Plant operator performance evaluation system

    International Nuclear Information System (INIS)

    Ujita, Hiroshi; Fukuda, Mitsuko; Kubota, Ryuji.

    1989-01-01

    A plant operator performance evaluation system to analyze plant operation records during accident training and to identify and classify operator errors has been developed for the purpose of supporting realization of a training and education system for plant operators. A knowledge engineering technique was applied to evaluation of operator behavior by both even-based and symptom-based procedures, in various situations including event transition due to multiple failures or operational errors. The system classifies the identified errors as to their single and double types based on Swain's error classification and the error levels reflecting Rasmussen's cognitive level, and it also evaluates the effect of errors on plant state and then classifies error influence, using 'knowledge for phenomena and operations', as represented by frames. It has additional functions for analysis of error statistics and knowledge acquisition support of 'knowledge for operations'. The system was applied to a training analysis for a scram event in a BWR plant, and its error analysis function was confirmed to be effective by operational experts. (author)

  9. Operational safety review programmes for nuclear power plants. Guidelines for assessment

    International Nuclear Information System (INIS)

    2002-01-01

    The IAEA has been offering the Operational Safety Review Team (OSART) programme to provide advice and assistance to Member States in enhancing the operational safety of nuclear power plants (NPPs). Simultaneously, the IAEA has encouraged self-assessment and review by Member States of their own nuclear power plants to continuously improve nuclear safety. Currently, some utilities have been implementing safety review programmes to independently review their own plants. Corporate or national operational safety review programmes may be compliance or performance based. Successful utilities have found that both techniques are necessary to provide assurance that (i) as a minimum the NPP meets specific corporate and legal requirements and (ii) management at the NPP is encouraged to pursue continuous improvement principles. These programmes can bring nuclear safety benefits to the plants and utilities. The IAEA has conducted two pilot missions to assess the effectiveness of the operational review programme. Based on these missions and on the experience gained during OSART missions, this document has been developed to provide guidance on and broaden national/corporate safety review programmes in Member States, and to assist in maximizing their benefits. These guidelines are intended primarily for the IAEA team to conduct assessment of a national/corporate safety review programme. However, this report may also be used by a country or utility to establish its own national/corporate safety review programme. The guidelines may likewise be used for self-assessment or for establishing a baseline when benchmarking other safety review programmes. This report consists of four parts. Section 2 addresses the planning and preparation of an IAEA assessment mission and Sections 3 and 4 deal with specific guidelines for conducting the assessment mission itself

  10. Advanced human-system interface design review guideline. General evaluation model, technical development, and guideline description

    Energy Technology Data Exchange (ETDEWEB)

    O`Hara, J.M.

    1994-07-01

    Advanced control rooms will use advanced human-system interface (HSI) technologies that may have significant implications for plant safety in that they will affect the operator`s overall role in the system, the method of information presentation, and the ways in which operators interact with the system. The U.S. Nuclear Regulatory Commission (NRC) reviews the HSI aspects of control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported to protect public health and safety. The principal guidance available to the NRC, however, was developed more than ten years ago, well before these technological changes. Accordingly, the human factors guidance needs to be updated to serve as the basis for NRC review of these advanced designs. The purpose of this project was to develop a general approach to advanced HSI review and the human factors guidelines to support NRC safety reviews of advanced systems. This two-volume report provides the results of the project. Volume I describes the development of the Advanced HSI Design Review Guideline (DRG) including (1) its theoretical and technical foundation, (2) a general model for the review of advanced HSIs, (3) guideline development in both hard-copy and computer-based versions, and (4) the tests and evaluations performed to develop and validate the DRG. Volume I also includes a discussion of the gaps in available guidance and a methodology for addressing them. Volume 2 provides the guidelines to be used for advanced HSI review and the procedures for their use.

  11. Spill operation system decision support system

    International Nuclear Information System (INIS)

    Clark, R.

    1992-01-01

    The MSRC Spill Operation System (SOS) is a tool for the support of decision-making at the time of a catastrophic oil spill. SOS provides MSRC decision-makers with access to information about the source of the spill, the spill environment, and the availability of spill response resources. This system is designed to meet the information needs of a Response Supervisor, an Environmental Advisor, Logistics/Maintenance Supervisor, Operations Supervisor, and the MSRC Regional General Manager. The SOS project Objectives are: (1) integrate currently available data, systems, and technologies; (2) develop an application that effectively supports mobilized operations and can be adapted to support normal operations; (3) ensure that the development of computer applications is driven by user needs and not by technology; and (4) coordinate with government and other industry organizations to avoid duplication of effort. Design Objectives for SOS are: (1) centralize management information storage while decentralizing decision making capabilities; (2) boost User confidence by providing a system that is easy to learn, easy to use, and is open-quotes Sailor Proofclose quotes; and (3) use visualization technology in providing spill related information. This approach includes the use of Geographic Information System (GIS) technology for maps and geographically associated resource; and support MSRC's concept of operation which includes - a swift notification of response personnel; fast mobilization of response resources; and accurate tracking of resources during a spill. MSRC is organized into five responsibility regions

  12. Operations and Maintenance Cost for Stratified Buildings: A Critical Review

    Directory of Open Access Journals (Sweden)

    Che-Ghani Nor Zaimah

    2016-01-01

    Full Text Available Building maintenance is essential in preserving buildings’ appearance and performance. It needs to upkeep the building performance to prolong its value and building life cycle. Malaysia is still lacking in managing cost for building operation and maintenance. It has been found that the cost for housing maintenance is high due to poor maintenance practices. In order to get better understanding on how to manage the cost, this study reviews the contributing factors that affecting operation and maintenance cost of stratified buildings in Malaysia. The research first identified the factors through extensive literature review and scrutinize on factors that affecting and can minimize operation and maintenance cost. This literature review offers insight into building maintenance scenario in Malaysia focusing on the issues and challenges. The study also finds that operation and maintenance cost for housing in Malaysia is still in poor state. Interestingly, this paper revealed that operation and maintenance cost is also influenced by three significant factors like expectation of tenants, building characteristics and building defects. Measures to reduce the housing operation and maintenance cost are also highlighted so that this study can be a stepping stone towards proposing efficient and effective facilities management strategies for affordable housing in future.

  13. National culture and operations management : a structured literature review

    NARCIS (Netherlands)

    Boscari, Stefania; Bortolotti, Thomas; Netland, Torbjorn; Rich, Nicholas

    2018-01-01

    National culture has received a substantial amount of interest in the operations management literature. We present the first structured review of articles studying national culture in operations management. Our search returned 51 papers published in ten leading journals between 2000 and 2017. We

  14. Transactive control: a framework for operating power systems characterized by high penetration of distributed energy resources

    DEFF Research Database (Denmark)

    Hu, Junjie; Yang, Guangya; Kok, Koen

    2016-01-01

    The increasing number of distributed energy resources connected to power systems raises operational challenges for the network operator, such as introducing grid congestion and voltage deviations in the distribution network level, as well as increasing balancing needs at the whole system level......, followed by a literature review and demonstration projects that apply to transactive control. Cases are then presented to illustrate the transactive control framework. At the end, discussions and research directions are presented, for applying transactive control to operating power systems, characterized...

  15. Assessment of the Plutonium Finishing Plant Criticality Alarm System U.S. Department of Energy Richland Operations Office

    International Nuclear Information System (INIS)

    NIRIDER, L.T.

    2002-01-01

    At the request of the Assistant Manager for Safety and Engineering, the U.S. Department of Energy Richland Operations Office (RL) Engineering Support Division, performed an oversight review of the Plutonium Finishing Plant (PFP) nuclear Criticality Alarm System (CAS). The review was conducted to satisfy requirements and agreements associated with Defense Nuclear Facility Safety Board (DNFSB) Recommendation 2000-2, ''Vital Safety Systems.'' The PFP is managed by Fluor Hanford, Inc. for RL. The field assessment and staff interviews were conducted August 12 through August 19,2002. This was a limited scope assessment that consisted of a review of the nuclear CAS operations, maintenance, and compliance with National Consensus Standards Requirements. The main purpose of the assessment was to determine the adequacy of the existing alarm system and its associated infrastructure to support the PFP facility mission through the remaining facility lifetime. The Review Plan was modeled upon Criteria and Review Approach Documents (CRAD) developed for DNFSB Recommendation 2000-2 reviews conducted across the Hanford Site. Concerns regarding component degradation and failure, increasing numbers of occurrence reports associated with the alarm system, and reliability issues were addressed. Additionally, RL performed a review of the engineering aspects of the CAS including the functions of design authorities and aspects of systems engineering. However, the focus of the assessment was on operations, maintenance, and reliability of the CAS, associated procurement practices, adequacy of safety and engineering policies and procedures, safety documentation, and fundamental engineering practices including training, qualification, and systems engineering. This assessment revealed that the PFP CAS and its associated infrastructure, administrative procedures, and conduct of operations are generally effective. There are no imminent criticality safety issues associated with the operation of the

  16. The importance of simulation facilities for the development of review criteria for advanced human system interfaces

    International Nuclear Information System (INIS)

    O'Hara, J.M.; Wachtel, J.

    1994-01-01

    Advanced control room (ACR) concepts are being developed in the commercial nuclear industry as part of future reactor designs. The ACRs will use advanced human-system interface (HSI) technologies that may have significant implications for plant safety in that they will affect the operator's overall role (function) in the system, the method of information presentation, the ways in which the operator interacts with the system, and the requirements on the operator to understand and supervise an increasingly complex system. The U.S. Nuclear Regulatory Commission (NRC) reviews the HSI aspects of control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported to protect public health and safety. The NRC is developing guidelines to support their review of these advanced designs. As part of this effort, a methodology for guidance development was established, and topics in need of further research were identified. Simulators of various kinds are likely to play important roles in the development of review guidelines and in the evaluation of ACRs. This paper describes a general approach to review criteria development, and discusses the role of simulators in addressing research needs

  17. An Assessment of Civil Tiltrotor Concept of Operations in the Next Generation Air Transportation System

    Science.gov (United States)

    Chung, William W.; Salvano, Dan; Rinehart, David; Young, Ray; Cheng, Victor; Lindsey, James

    2012-01-01

    Based on a previous Civil Tiltrotor (CTR) National Airspace System (NAS) performance analysis study, CTR operations were evaluated over selected routes and terminal airspace configurations assuming noninterference operations (NIO) and runway-independent operations (RIO). This assessment aims to further identify issues associated with these concepts of operations (ConOps), and their dependency on the airspace configuration and interaction with conventional fixed-wing traffic. Safety analysis following a traditional Safety Management System (SMS) methodology was applied to CTR-unique departure and arrival failures in the selected airspace to identify any operational and certification issues. Additional CTR operational cases were then developed to get a broader understanding of issues and gaps that will need to be addressed in future CTR operational studies. Finally, needed enhancements to National Airspace System performance analysis tools were reviewed, and recommendations were made on improvements in these tools that are likely to be required to support future progress toward CTR fleet operations in the Next Generation Air Transportation System (NextGen).

  18. Peer Reviews: a voluntary means of enhancing operating culture

    International Nuclear Information System (INIS)

    Vella, R.

    1996-01-01

    In the nuclear energy industry, and also in other fields, excellent experience has been gained from the regular accumulation of expert evidence of power station operation through external organizations or teams. In 1991, the World Association of Nuclear Operations (WANO) initiated a pilot programme for voluntary 'Peer Reviews'. The success of this first exercise in gathering expert evidence led to the introduction of the 'Peer Review' programme in 1993 as one of the standard programmes of WANO. The object was to increase the safety and reliability of nuclear power stations throughout the world. WANO Peer Reviews are voluntary and are carried out at the request of a member. They are oriented towards special WANO performance objectives and criteria, which have been established by the management of WANO. (orig.) [de

  19. Emergency operation determination system

    International Nuclear Information System (INIS)

    Miki, Tetsushi.

    1993-01-01

    The system of the present invention can determine an emergency operation coping with abnormal events occurring during nuclear plant operation without replying on an operator's judgement. That is, the system of the present invention comprises an intelligence base which divides and classifies the aims of the plant operation for the function, structure and operation manual and puts them into network. Degree of attainment for the extend of the status normality is determined on every aim of operation based on various kinds of measured data during plant operation. For a degree of attainment within a predetermined range, it is judged that an emergency operation is possible although this is in an abnormal state. Degree of emergency is determined by a fuzzy theory based on the degree of attainment, variation coefficient for the degree of attainment and the sensitivity to external disturbance as parameters. Priority for the degree of emergency on every operation aims is determined by comparison. Normality is successively checked for the determined operation aims. As a result, equipments as objects of abnormality suppressing operation are specified, and the operation amount of the equipments as objects are determined so that the measuring data are within a predetermined range. (I.S.)

  20. Autonomous Operations System: Development and Application

    Science.gov (United States)

    Toro Medina, Jaime A.; Wilkins, Kim N.; Walker, Mark; Stahl, Gerald M.

    2016-01-01

    Autonomous control systems provides the ability of self-governance beyond the conventional control system. As the complexity of mechanical and electrical systems increases, there develops a natural drive for developing robust control systems to manage complicated operations. By closing the bridge between conventional automated systems to knowledge based self-awareness systems, nominal control of operations can evolve into relying on safe critical mitigation processes to support any off-nominal behavior. Current research and development efforts lead by the Autonomous Propellant Loading (APL) group at NASA Kennedy Space Center aims to improve cryogenic propellant transfer operations by developing an automated control and health monitoring system. As an integrated systems, the center aims to produce an Autonomous Operations System (AOS) capable of integrating health management operations with automated control to produce a fully autonomous system.

  1. Smart Cards and Card Operating Systems

    NARCIS (Netherlands)

    Hartel, Pieter H.; Bartlett, J.; de Jong, Eduard K.

    The operating system of an IC card should provide an appropriate interface to applications using IC cards. An incorrect choice of operations and data renders the card inefficient and cumbersome. The design principles of the UNIX operating system are most appropriate for IC card operating system

  2. Review of SC/RF refrigeration systems

    International Nuclear Information System (INIS)

    Byrns, R.A.

    1990-01-01

    A short review is given of historical events in accelerator and cryogenic developments at both Stanford and Berkeley. Methods of refrigeration between 1.85 K and 4.5 K together with modern techniques and improvements are discussed. Where the decade of the 70's was the era of the screw compressor, the 80's can be considered that of the cold vacuum pump for superfluid cooling. Distribution methods are of major importance, and arguments can be made for bath or tube cooling, two-phase, thermo-syphon, supercritical or superfluid. System design affects reliability, safety and operating stability. Distribution costs and heat loads can be a large part of system totals. Some specific system descriptions are included. (author)

  3. Method and Apparatus Providing Deception and/or Altered Operation in an Information System Operating System

    Science.gov (United States)

    Cohen, Fred; Rogers, Deanna T.; Neagoe, Vicentiu

    2008-10-14

    A method and/or system and/or apparatus providing deception and/or execution alteration in an information system. In specific embodiments, deceptions and/or protections are provided by intercepting and/or modifying operation of one or more system calls of an operating system.

  4. Concepts and features about poka-yoke systems: a literature review

    Directory of Open Access Journals (Sweden)

    Gabriel Vidor

    2011-05-01

    Full Text Available This paper has the purpose of analyzing methods, techniques and guidelines for the design, operation and maintenance of poka-yoke systems. In parallel it intends to contribute with concepts about what poka-yoke are and their classification. Therefore a literature review was made about systems poka-yoke concepts, poka-yoke systems classification, kinds of inspections, kinds of mistakes, the relationship between stability and statistical process control with mistake proofing systems, techniques and directions to design and manage poka-yoke. An analysis was carried out with each subject relating poka-yoke with the subject. At the end the absence of a poka-yoke management system was evident, because techniques for design, operation and maintenance aren’t consistent.

  5. Operating-procedure system at Savannah River Plant

    International Nuclear Information System (INIS)

    Tope, C.W.

    1981-05-01

    Three types of procedures are widely used at SRP: Du Pont Savannah Operating Logsheet, Du Pont Savannah Operating Procedure, and Plant Manual. This document briefly reviews originating of the procedures, their preparation, control, and indexing

  6. A Brief Review of the Need for Robust Smart Wireless Sensor Systems for Future Propulsion Systems, Distributed Engine Controls, and Propulsion Health Management

    Science.gov (United States)

    Hunter, Gary W.; Behbahani, Alireza

    2012-01-01

    Smart Sensor Systems with wireless capability operational in high temperature, harsh environments are a significant component in enabling future propulsion systems to meet a range of increasingly demanding requirements. These propulsion systems must incorporate technology that will monitor engine component conditions, analyze the incoming data, and modify operating parameters to optimize propulsion system operations. This paper discusses the motivation towards the development of high temperature, smart wireless sensor systems that include sensors, electronics, wireless communication, and power. The challenges associated with the use of traditional wired sensor systems will be reviewed and potential advantages of Smart Sensor Systems will be discussed. A brief review of potential applications for wireless smart sensor networks and their potential impact on propulsion system operation, with emphasis on Distributed Engine Control and Propulsion Health Management, will be given. A specific example related to the development of high temperature Smart Sensor Systems based on silicon carbide electronics will be discussed. It is concluded that the development of a range of robust smart wireless sensor systems are a foundation for future development of intelligent propulsion systems with enhanced capabilities.

  7. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    This study attempts to identify and analyze the impacts of the System Operating Strategy (SOS) alternatives on cultural resources. The impacts include effects on Native American traditional cultural values, properties and practices. They also include effects on archeological or historic properties meeting the criteria of the National Register of Historic Places. In addition to responding to the requirements of the National Environmental Policy Act (NEPA), this analysis addresses the requirements of the National Historic Preservation Act (NHPA), the Archeological Resources Protection Act (ARPA), the Native American Graves Protection and Repatriation Act (NAGPRA), the Native American Religious Freedom Act (NARFA), and other relevant legislation. To meet their legally mandated cultural resources requirements, the SOR agencies will develop agreements and Implementation Plans with the appropriate State Historic Preservation Officers (SHPOs), Tribes, and the Advisory Council on Historic Preservation (ACHP) detailing the measures necessary to best manage the resource. The planning and implementation activities will be staged over a number of years in consultation with affected Tribes

  8. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  9. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    International Nuclear Information System (INIS)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations

  10. Issues regarding the design and acceptance of intelligent support systems for reactor operators

    International Nuclear Information System (INIS)

    Bernard, J.A.

    1992-01-01

    In this paper, factors relevant to the design and acceptance of intelligent support systems for the operation of nuclear power plants are enumerated and discussed. The central premise is that conventional expert systems which encode experiential knowledge in production rules are not a suitable vehicle for the creation of practical operator support systems. The principal difficulty is the need for real-time operation. This in turn means that intelligent support systems will have knowledge bases derived from temporally accurate plant models, inference engines that permit revisions in the search process so as to accommodate revised or new data, and man-machine interfaces that do not require any human input. Such systems will have to be heavily instrumented and the associated knowledge bases will require a hierarchical organization so as to emulate human approaches to analysis. Issues related to operator acceptance of intelligent support tools are then reviewed. Possible applications are described and the relative merits of the machine- and human-centered approaches to the implementation of intelligent support systems are enumerated. The paper concludes with a plea for additional experimental evaluations

  11. SAMO [Sistema de Apoyo Mechanizado a la Operacion]: An operational aids computer system

    International Nuclear Information System (INIS)

    Stormer, T.D.; Laflor, E.V.

    1989-01-01

    SAMO (Sistema de Apoyo Mechanizado a la Operacion) is a sensor-driven, computer-based, graphic display system designed by Westinghouse to aid the A. N. Asco operations staff during all modes of plant operations, including emergencies. The SAMO system is being implemented in the A. N. Asco plant in two phases that coincide with consecutive refueling outages for each of two nuclear units at the Asco site. Phase 1 of the SAMO system implements the following functions: (1) emergency operational aids, (2) postaccident monitoring, (3) plant graphics display, (4) high-speed transient analysis recording, (5) historical data collection, storage, and retrieval, (6) sequence of events, and (7) posttrip review. During phase 2 of the SAMO project, the current plant computer will be removed and the functions now performed by the plant computer will be performed by the SAMO system. In addition, the following functions will be implemented: (1) normal and simple transients operational aid, (2) plant information graphics; and (3) real-time radiological off-site dose calculation

  12. Concepts and features about poka-yoke systems: a literature review

    OpenAIRE

    Gabriel Vidor; Tarcísio Abreu Saurin

    2011-01-01

    This paper has the purpose of analyzing methods, techniques and guidelines for the design, operation and maintenance of poka-yoke systems. In parallel it intends to contribute with concepts about what poka-yoke are and their classification. Therefore a literature review was made about systems poka-yoke concepts, poka-yoke systems classification, kinds of inspections, kinds of mistakes, the relationship between stability and statistical process control with mistake proofing systems, techniques...

  13. Abattoir operations and waste management in Nigeria: A review of ...

    African Journals Online (AJOL)

    Abattoir operations and waste management in Nigeria: A review of challenges ... Log in or Register to get access to full text downloads. ... militating against the establishment, operations and management of abattoirs are not given attention.

  14. Non-safety piping operability review case study -- Today and tomorrow

    International Nuclear Information System (INIS)

    Flensburg, W.C.; Adams, T.M.

    1995-01-01

    During a 1993 Outage at the Perry Nuclear Power Station, a condition report was issued which identified potential intersystem loss of water between the Emergency Closed Cooling Water System and the Nuclear Closed Cooling Water System during a design basis event. The review of this condition report indicated that if a SSE (safe shutdown earthquake) event were to occur during a design basis event components important to plant safety could potentially be adversely affected if non-seismic/non-safety portions of the Nuclear Closed Cooling Water System could not maintain pressure boundary integrity as a result of the seismic loadings. Presented in this paper are steps, criteria, and methodology used to demonstrate the seismic acceptability of the affected portion of the Nuclear Closed Cooling Water System Piping. Also discussed are the potential benefits and applicability of a recently developed EPRI non-safety, non-seismic operability procedure. This discussion includes the potential cost savings which could have arisen from application of this recently developed procedure

  15. Emergency gas operation strategy and system establishment for large-scale disaster; Strategie d'operation en urgence et construction de systemes pour parer aux desastres de grande importance

    Energy Technology Data Exchange (ETDEWEB)

    Toshihira, Hara [Tokyo Gas Co., Ltd (Japan); Yoshihisa, Shimizu [Tokyo Gas Co., Ltd (Japan); Takashi, Imagawa [Toho Gas Co., Ltd (Japan)

    2000-07-01

    Japan's gas companies have wide-ranging experience of earthquakes and other disasters and have for long put the lessons learned from these disasters to good use through regular reviews of their emergency gas operation strategies. However, the Great Hanshin Earthquake disaster of January 1995 made them acutely aware of the need for a more radical review of this strategy. Japan's big gas companies are currently devoting maximum resources to reviewing their emergency strategies and constructing the sorts of systems needed to deal with major disasters. In the first half of the present paper, we discuss the experience of Toho Gas, which has just finished work on a comprehensive group of systems, and explain the 'thinking behind the systems'. In the second half of the paper, we discuss some of the ways in which Tokyo Gas has been endeavoring to further refine and enhance its systems and introduce the reader to the latest emergency strategy support systems in the shape of the 'sub-center concept, training system construction, and damage estimation systems'. These should also make useful references for gas companies from other countries. (authors)

  16. Technology and Policy Challenges in the Adoption and Operation of Health Information Exchange Systems.

    Science.gov (United States)

    Ji, Hyerim; Yoo, Sooyoung; Heo, Eun-Young; Hwang, Hee; Kim, Jeong-Whun

    2017-10-01

    This study aimed to identify problems and issues that arise with the implementation of online health information exchange (HIE) systems in a medical environment and to identify solutions to facilitate the successful operation of future HIE systems in primary care clinics and hospitals. In this study, the issues that arose during the establishment and operation of an HIE system in a hospital were identified so that they could be addressed to enable the successful establishment and operation of a standard-based HIE system. After the issues were identified, they were reviewed and categorized by a group of experts that included medical information system experts, doctors, medical information standard experts, and HIE researchers. Then, solutions for the identified problems were derived based on the system development, operation, and improvement carried out during this work. Twenty-one issues were identified during the implementation and operation of an online HIE system. These issues were then divided into four categories: system architecture and standards, documents and data items, consent of HIE, and usability. We offer technical and policy recommendations for various stakeholders based on the experiences of operating and improving the online HIE system in the medical field. The issues and solutions identified in this study regarding the implementation and operate of an online HIE system can provide valuable insight for planners to enable them to successfully design and operate such systems at a national level in the future. In addition, policy support from governments is needed.

  17. The THUDSOS Distributed Operating System

    Institute of Scientific and Technical Information of China (English)

    廖先Zhi; 刘旭峰; 等

    1991-01-01

    The THUDSOS is a distributed operating system modeled as an abstract machine which provides decentralized control,transparency,availability,and reliability,as welol as a good degree of autonomy at each node,that makes our distributed system usable.Our operating system supports transparent access to data through network wide filesystem.The simultaneous access to any device is discussed for the case when the peripherals are treated as files.This operating system allows spawning of parallel application programs to solve problems in the fields,such as numerical analysis and artificial intelligence.

  18. Operation method and operation control device for emergency core cooling system

    Energy Technology Data Exchange (ETDEWEB)

    Kinoshita, Shoichiro; Takahashi, Toshiyuki; Fujii, Tadashi [Hitachi Ltd., Tokyo (Japan); Mizutani, Akira

    1996-05-07

    The present invention provides a method of reducing continuous load capacity of an emergency cooling system of a BWR type reactor and a device reducing a rated capacity of an emergency power source facility. Namely, the emergency core cooling system comprises a first cooling system having a plurality of power source systems based on a plurality of emergency power sources and a second cooling system having a remaining heat removing function. In this case, when the first cooling system is operated the manual starting under a predetermined condition that an external power source loss event should occur, a power source division different from the first cooling system shares the operation to operate the secondary cooling system simultaneously. Further, the first cooling system is constituted as a high pressure reactor core water injection system and the second cooling system is constituted as a remaining heat removing system. With such a constitution, a high pressure reactor core water injection system for manual starting and a remaining heat removing system of different power source division can be operated simultaneously before automatic operation of the emergency core cooling system upon loss of external power source of a nuclear power plant. (I.S.)

  19. The limitations in implementing and operating a rapid response system.

    Science.gov (United States)

    Subramaniam, A; Botha, J; Tiruvoipati, R

    2016-10-01

    Despite the widespread introduction of rapid response systems (RRS)/medical emergency teams (MET), there is still controversy regarding how effective they are. While there are some observational studies showing improved outcomes with RRS, there are no data from randomised controlled trials to support the effectiveness. Nevertheless, the MET system has become a standard of care in many healthcare organisations. In this review, we present an overview of the limitations in implementing and operating a RRS in modern healthcare. © 2016 Royal Australasian College of Physicians.

  20. Operating room use of hypertonic solutions: a clinical review

    Directory of Open Access Journals (Sweden)

    Gustavo Azoubel

    2008-01-01

    Full Text Available Hyperosmotic-hyperoncotic solutions have been widely used during prehospital care of trauma patients and have shown positive hemodynamic effects. Recently, there has been a growing interest in intra-operative use of hypertonic solutions. We reviewed 30 clinical studies on the use of hypertonic saline solutions during surgeries, with the majority being cardiac surgeries. Reduced positive fluid balance, increased cardiac index, and decreased systemic vascular resistance were the main beneficial effects of using hypertonic solutions in this population. Well-designed clinical trials are highly needed, particularly in aortic aneurysm repair surgeries, where hypertonic solutions have shown many beneficial effects. Examining the immunomodulatory effects of hypertonic solutions should also be a priority in future studies.

  1. E-commerce Review System to Detect False Reviews.

    Science.gov (United States)

    Kolhar, Manjur

    2017-08-15

    E-commerce sites have been doing profitable business since their induction in high-speed and secured networks. Moreover, they continue to influence consumers through various methods. One of the most effective methods is the e-commerce review rating system, in which consumers provide review ratings for the products used. However, almost all e-commerce review rating systems are unable to provide cumulative review ratings. Furthermore, review ratings are influenced by positive and negative malicious feedback ratings, collectively called false reviews. In this paper, we proposed an e-commerce review system framework developed using the cumulative sum method to detect and remove malicious review ratings.

  2. Real-Time Operating Systems for Multicore Embedded Systems

    OpenAIRE

    Tomiyama, Hiroyuki; Honda, Shinya; Takada, Hiroaki

    2008-01-01

    Multicore systems-on-chip have become popular inthe design of embedded systems in order to simultaneously achieve high performance and low power consumption. On the software side, real-time operating systems are necessary in orderto handle growing complexity of embedded software. This paper describes requirements, design principles and implementation techniques for real-time operating systems to be used inasymmetric multicore systems.

  3. Can cultural differences lead to accidents? Team cultural differences and sociotechnical system operations.

    Science.gov (United States)

    Strauch, Barry

    2010-04-01

    I discuss cultural factors and how they may influence sociotechnical system operations. Investigations of several major transportation accidents suggest that cultural factors may have played a role in the causes of the accidents. However, research has not fully addressed how cultural factors can influence sociotechnical systems. I review literature on cultural differences in general and cultural factors in sociotechnical systems and discuss how these differences can affect team performance in sociotechnical systems. Cultural differences have been observed in social and interpersonal dimensions and in cognitive and perceptual styles; these differences can affect multioperator team performance. Cultural factors may account for team errors in sociotechnical systems, most likely during high-workload, high-stress operational phases. However, much of the research on cultural factors has methodological and interpretive shortcomings that limit their applicability to sociotechnical systems. Although some research has been conducted on the role of cultural differences on team performance in sociotechnical system operations, considerable work remains to be done before the effects of these differences can be fully understood. I propose a model that illustrates how culture can interact with sociotechnical system operations and suggest avenues of future research. Given methodological challenges in measuring cultural differences and team performance in sociotechnical system operations, research in these systems should use a variety of methodologies to better understand how culture can affect multioperator team performance in these systems.

  4. Parametric Optimization of Some Critical Operating System Functions--An Alternative Approach to the Study of Operating Systems Design

    Science.gov (United States)

    Sobh, Tarek M.; Tibrewal, Abhilasha

    2006-01-01

    Operating systems theory primarily concentrates on the optimal use of computing resources. This paper presents an alternative approach to teaching and studying operating systems design and concepts by way of parametrically optimizing critical operating system functions. Detailed examples of two critical operating systems functions using the…

  5. Operating experience review for nuclear power plants in the Systematic Evaluation Program

    International Nuclear Information System (INIS)

    Mays, G.T.; Harrington, K.H.

    1982-01-01

    The Systematic Evaluation Program Branch (SEPB) of the Nuclear Regulatory Commission (NRC) is conducting the Systematic Evaluation Program (SEP) whose purpose is to determine the safety margins of the design and operation of the eleven oldest operating commercial nuclear power plants in the United States. This paper describes the methodology and results of the operational experience review portion of the SEP evaluation. SEPB will combine the results from these operational reviews with other safety topic evaluations to perform an integrated assessment of the SEP plants

  6. Lost in Optimisation of Water Distribution Systems? A Literature Review of System Design

    Directory of Open Access Journals (Sweden)

    Helena Mala-Jetmarova

    2018-03-01

    Full Text Available Optimisation of water distribution system design is a well-established research field, which has been extremely productive since the end of the 1980s. Its primary focus is to minimise the cost of a proposed pipe network infrastructure. This paper reviews in a systematic manner articles published over the past three decades, which are relevant to the design of new water distribution systems, and the strengthening, expansion and rehabilitation of existing water distribution systems, inclusive of design timing, parameter uncertainty, water quality, and operational considerations. It identifies trends and limits in the field, and provides future research directions. Exclusively, this review paper also contains comprehensive information from over one hundred and twenty publications in a tabular form, including optimisation model formulations, solution methodologies used, and other important details.

  7. DEVELOPMENT OF OPERATIONAL CONCEPTS FOR ADVANCED SMRs: THE ROLE OF COGNITIVE SYSTEMS ENGINEERING

    Energy Technology Data Exchange (ETDEWEB)

    Jacques Hugo; David Gertman

    2014-04-01

    Advanced small modular reactors (AdvSMRs) will use advanced digital instrumentation and control systems, and make greater use of automation. These advances not only pose technical and operational challenges, but will inevitably have an effect on the operating and maintenance (O&M) cost of new plants. However, there is much uncertainty about the impact of AdvSMR designs on operational and human factors considerations, such as workload, situation awareness, human reliability, staffing levels, and the appropriate allocation of functions between the crew and various automated plant systems. Existing human factors and systems engineering design standards and methodologies are not current in terms of human interaction requirements for dynamic automated systems and are no longer suitable for the analysis of evolving operational concepts. New models and guidance for operational concepts for complex socio-technical systems need to adopt a state-of-the-art approach such as Cognitive Systems Engineering (CSE) that gives due consideration to the role of personnel. This approach we report on helps to identify and evaluate human challenges related to non-traditional concepts of operations. A framework - defining operational strategies was developed based on the operational analysis of Argonne National Laboratory’s Experimental Breeder Reactor-II (EBR-II), a small (20MWe) sodium-cooled reactor that was successfully operated for thirty years. Insights from the application of the systematic application of the methodology and its utility are reviewed and arguments for the formal adoption of CSE as a value-added part of the Systems Engineering process are presented.

  8. Review of P-scan computer-based ultrasonic inservice inspection system. Supplement 1

    International Nuclear Information System (INIS)

    Harris, R.V. Jr.; Angel, L.J.

    1995-12-01

    This Supplement reviews the P-scan system, a computer-based ultrasonic system used for inservice inspection of piping and other components in nuclear power plants. The Supplement was prepared using the methodology described in detail in Appendix A of NUREG/CR-5985, and is based on one month of using the system in a laboratory. This Supplement describes and characterizes: computer system, ultrasonic components, and mechanical components; scanning, detection, digitizing, imaging, data interpretation, operator interaction, data handling, and record-keeping. It includes a general description, a review checklist, and detailed results of all tests performed

  9. Quality and Operations Management in Food Supply Chains: A Literature Review

    Directory of Open Access Journals (Sweden)

    Yong He

    2018-01-01

    Full Text Available We present a literature review on quality and operations management problems in food supply chains. In food industry, the quality of the food products declines over time and should be addressed in the supply chain operations management. Managing food supply chains with operations management methods not only generates economic benefit, but also contributes to environmental and social benefits. The literature on this topic has been burgeoning in the past few years. Since 2005, more than 100 articles have been published on this topic in major operations research and management science journals. In this literature review, we concentrate on the quantitative models in this research field and classify the related articles into four categories, that is, storage problems, distribution problems, marketing problems, and food traceability and safety problems. We hope that this review serves as a reference for interested researchers and a starting point for those who wish to explore it further.

  10. An independent system operator's perspective on operational ramp forecasting

    Energy Technology Data Exchange (ETDEWEB)

    Porter, G. [New Brunswick System Operator, Fredericton, NB (Canada)

    2010-07-01

    One of the principal roles of the power system operator is to select the most economical resources to reliably supply electric system power needs. Operational wind power production forecasts are required by system operators in order to understand the impact of ramp event forecasting on dispatch functions. A centralized dispatch approach can contribute to a more efficient use of resources that traditional economic dispatch methods. Wind ramping events can have a significant impact on system reliability. Power systems can have constrained or robust transmission systems, and may also be islanded or have large connections to neighbouring systems. Power resources can include both flexible and inflexible generation resources. Wind integration tools must be used by system operators to improve communications and connections with wind power plants. Improved wind forecasting techniques are also needed. Sensitivity to forecast errors is dependent on current system conditions. System operators require basic production forecasts, probabilistic forecasts, and event forecasts. Forecasting errors were presented as well as charts outlining the implications of various forecasts. tabs., figs.

  11. Autonomous Systems and Operations

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Autonomous Systems and Operations (ASO) project will develop an understanding of the impacts of increasing communication time delays on mission operations,...

  12. EOS Operations Systems: EDOS Implemented Changes to Reduce Operations Costs

    Science.gov (United States)

    Cordier, Guy R.; Gomez-Rosa, Carlos; McLemore, Bruce D.

    2007-01-01

    The authors describe in this paper the progress achieved to-date with the reengineering of the Earth Observing System (EOS) Data and Operations System (EDOS), the experience gained in the process and the ensuing reduction of ground systems operations costs. The reengineering effort included a major methodology change, applying to an existing schedule driven system, a data-driven system approach.

  13. Development of the automatic control rod operation system for JOYO. Verification of automatic control rod operation guide system

    International Nuclear Information System (INIS)

    Terakado, Tsuguo; Suzuki, Shinya; Kawai, Masashi; Aoki, Hiroshi; Ohkubo, Toshiyuki

    1999-10-01

    The automatic control rod operation system was developed to control the JOYO reactor power automatically in all operation modes(critical approach, cooling system heat up, power ascent, power descent), development began in 1989. Prior to applying the system, verification tests of the automatic control rod operation guide system was conducted during 32nd duty cycles of JOYO' from Dec. 1997 to Feb. 1998. The automatic control rod operation guide system consists of the control rod operation guide function and the plant operation guide function. The control rod operation guide function provides information on control rod movement and position, while the plant operation guide function provide guidance for plant operations corresponding to reactor power changes(power ascent or power descent). Control rod insertion or withdrawing are predicted by fuzzy algorithms. (J.P.N.)

  14. Minimum radwaste system to support commercial operation-what equipment can be deferred

    International Nuclear Information System (INIS)

    Marshall, R.W.; Tafazzoli, M.M.

    1984-01-01

    Because of cash flow problems being experienced by utilities as nuclear power stations approach completion, areas of the plant for which the completion of the construction effort could be deferred past commercial operation should be reviewed. The radwaste treatment systems are prime candidates for such a deferral because of the availability, either temporary or permanent, of alternative treatment methods for the waste streams expected to be produced. In order to identify the radwaste equipment, components and associated hardware in the radwaste building which could be deferred past commercial operation, a study was performed by Impell Corporation to evaluate the existing radwaste treatment system and determine the minimum system necessary to support commercial operation of a typical BWR. The study identified the minimum-installed radwaste treatment system which, in combination with portable temporary equipment, would accommodate the waste types and quantities likely to be produced in the first few years of operation. In addition, the minimum-installed system had to be licensable and excessive radiation exposures should not be incurred during the construction of the deferred portions of the system after commercial operation. From this study, it was concluded that a significant quantity of radwaste processing equipment and the associated piping, valves and instrumentation could be deferred. The estimated savings, in construction manhours (excluding field distributables) alone, was over 102,000 M-H

  15. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix N: Wildlife.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included.

  16. Columbia River system operation review: Final environmental impact statement. Appendix N, wildlife

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included

  17. Forecasting and observability: critical technologies for system operations with high PV penetration

    DEFF Research Database (Denmark)

    Alet, Pierre-Jean; Efthymiou, Venizelos; Graditi, Giorgio

    2016-01-01

    – Photovoltaics (ETIP PV) reviews the different use cases for these technologies, their current status, and the need for future developments. Power system operations require a real-time view of PV production for managing power reserves and for feeding shortterm forecasts. They also require forecasts on all......Forecasting and monitoring technologies for photovoltaics are required on different spatial and temporal scales by multiple actors, from the owners of PV systems to transmission system operators. In this paper the Grid integration working group of the European Technology and Innovation Platform...... timescales from the short (for dispatching purposes), where statistical models work best, to the very long (for infrastructure planning), where physics-based models are more accurate. Power system regulations are driving the development of these techniques. This application also provides a good basis...

  18. HVAC system operation manual of IMEF

    International Nuclear Information System (INIS)

    Baek, Sang Yeol; Park, Dae Kyu; Ahn, Sang Bok; Ju, Yong Sun.

    1997-06-01

    This manual is operation procedures of the IMEF(Irradiated Material Examination Facility) HVAC(Heating, Ventilation and Air Conditioning) System. General operation procedures and test method of the IMEF HVAC system are described. The manual is as follows; 1. HVAC system operation manual 2. HVAC system management guide 3. HVAC system maintenance manual 4. HVAC system air velocity and flowrate measurement manual 5. HVAC system HEPA filter leak test manual 6. HVAC system charcoal filter leak test manual 7. HVAC system HEPA and charcoal filter exchange manual. (author). 8 tabs

  19. Automated packing systems: review of industrial implementations

    Science.gov (United States)

    Whelan, Paul F.; Batchelor, Bruce G.

    1993-08-01

    A rich theoretical background to the problems that occur in the automation of material handling can be found in operations research, production engineering, systems engineering and automation, more specifically machine vision, literature. This work has contributed towards the design of intelligent handling systems. This paper will review the application of these automated material handling and packing techniques to industrial problems. The discussion will also highlight the systems integration issues involved in these applications. An outline of one such industrial application, the automated placement of shape templates on to leather hides, is also discussed. The purpose of this system is to arrange shape templates on a leather hide in an efficient manner, so as to minimize the leather waste, before they are automatically cut from the hide. These pieces are used in the furniture and car manufacturing industries for the upholstery of high quality leather chairs and car seats. Currently this type of operation is semi-automated. The paper will outline the problems involved in the full automation of such a procedure.

  20. UNIX-based operating systems robustness evaluation

    Science.gov (United States)

    Chang, Yu-Ming

    1996-01-01

    Robust operating systems are required for reliable computing. Techniques for robustness evaluation of operating systems not only enhance the understanding of the reliability of computer systems, but also provide valuable feed- back to system designers. This thesis presents results from robustness evaluation experiments on five UNIX-based operating systems, which include Digital Equipment's OSF/l, Hewlett Packard's HP-UX, Sun Microsystems' Solaris and SunOS, and Silicon Graphics' IRIX. Three sets of experiments were performed. The methodology for evaluation tested (1) the exception handling mechanism, (2) system resource management, and (3) system capacity under high workload stress. An exception generator was used to evaluate the exception handling mechanism of the operating systems. Results included exit status of the exception generator and the system state. Resource management techniques used by individual operating systems were tested using programs designed to usurp system resources such as physical memory and process slots. Finally, the workload stress testing evaluated the effect of the workload on system performance by running a synthetic workload and recording the response time of local and remote user requests. Moderate to severe performance degradations were observed on the systems under stress.

  1. Advanced human-system interface design review guideline. General evaluation model, technical development, and guideline description

    International Nuclear Information System (INIS)

    O'Hara, J.M.

    1994-07-01

    Advanced control rooms will use advanced human-system interface (HSI) technologies that may have significant implications for plant safety in that they will affect the operator's overall role in the system, the method of information presentation, and the ways in which operators interact with the system. The U.S. Nuclear Regulatory Commission (NRC) reviews the HSI aspects of control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported to protect public health and safety. The principal guidance available to the NRC, however, was developed more than ten years ago, well before these technological changes. Accordingly, the human factors guidance needs to be updated to serve as the basis for NRC review of these advanced designs. The purpose of this project was to develop a general approach to advanced HSI review and the human factors guidelines to support NRC safety reviews of advanced systems. This two-volume report provides the results of the project. Volume I describes the development of the Advanced HSI Design Review Guideline (DRG) including (1) its theoretical and technical foundation, (2) a general model for the review of advanced HSIs, (3) guideline development in both hard-copy and computer-based versions, and (4) the tests and evaluations performed to develop and validate the DRG. Volume I also includes a discussion of the gaps in available guidance and a methodology for addressing them. Volume 2 provides the guidelines to be used for advanced HSI review and the procedures for their use

  2. Distributed Operating Systems

    NARCIS (Netherlands)

    Mullender, Sape J.

    1987-01-01

    In the past five years, distributed operating systems research has gone through a consolidation phase. On a large number of design issues there is now considerable consensus between different research groups. In this paper, an overview of recent research in distributed systems is given. In turn, the

  3. Space station operating system study

    Science.gov (United States)

    Horn, Albert E.; Harwell, Morris C.

    1988-01-01

    The current phase of the Space Station Operating System study is based on the analysis, evaluation, and comparison of the operating systems implemented on the computer systems and workstations in the software development laboratory. Primary emphasis has been placed on the DEC MicroVMS operating system as implemented on the MicroVax II computer, with comparative analysis of the SUN UNIX system on the SUN 3/260 workstation computer, and to a limited extent, the IBM PC/AT microcomputer running PC-DOS. Some benchmark development and testing was also done for the Motorola MC68010 (VM03 system) before the system was taken from the laboratory. These systems were studied with the objective of determining their capability to support Space Station software development requirements, specifically for multi-tasking and real-time applications. The methodology utilized consisted of development, execution, and analysis of benchmark programs and test software, and the experimentation and analysis of specific features of the system or compilers in the study.

  4. Visual assistance system for cyclotron operation

    International Nuclear Information System (INIS)

    Okamura, Tetsuya; Tachikawa, Toshiki; Murakami, Tohru.

    1994-01-01

    A computer-based operation system for a cyclotron which assists operators has been developed. It is the operation assistance system depending on visual sense to indicate beam parameters to operators. First, the mental model of operators at the time of beam adjustment was analyzed, and it was presumed to be composed of five partial mental models, that is, beam behavior model, feasible setting region model, parameter sensitivity model, parameter interrelation model and status map model. Next, three visual interfaces were developed. Beam trajectory is rapidly calculated and graphically displayed whenever operators change parameters. Feasible setting regions (FSR) for parameters that satisfy the beam acceptance criteria of a cyclotron are indicated. The distribution of beam current values which are the quantity for evaluating adjustment is indicated as search history. Finally, for evaluating the system effectiveness, the search time required to reach the optimum conditions was measured. In addition, the system usability was evaluated by written questionnaires. The result of experiment showed the reduction of search time by about 65%. The written questionnaires survey showed the operators highly evaluate system usability. (K.I.)

  5. New operator assistance features in the CMS Run Control System

    Science.gov (United States)

    Andre, J.-M.; Behrens, U.; Branson, J.; Brummer, P.; Chaze, O.; Cittolin, S.; Contescu, C.; Craigs, B. G.; Darlea, G.-L.; Deldicque, C.; Demiragli, Z.; Dobson, M.; Doualot, N.; Erhan, S.; Fulcher, J. R.; Gigi, D.; Gładki, M.; Glege, F.; Gomez-Ceballos, G.; Hegeman, J.; Holzner, A.; Janulis, M.; Jimenez-Estupiñán, R.; Masetti, L.; Meijers, F.; Meschi, E.; Mommsen, R. K.; Morovic, S.; O'Dell, V.; Orsini, L.; Paus, C.; Petrova, P.; Pieri, M.; Racz, A.; Reis, T.; Sakulin, H.; Schwick, C.; Simelevicius, D.; Vougioukas, M.; Zejdl, P.

    2017-10-01

    During Run-1 of the LHC, many operational procedures have been automated in the run control system of the Compact Muon Solenoid (CMS) experiment. When detector high voltages are ramped up or down or upon certain beam mode changes of the LHC, the DAQ system is automatically partially reconfigured with new parameters. Certain types of errors such as errors caused by single-event upsets may trigger an automatic recovery procedure. Furthermore, the top-level control node continuously performs cross-checks to detect sub-system actions becoming necessary because of changes in configuration keys, changes in the set of included front-end drivers or because of potential clock instabilities. The operator is guided to perform the necessary actions through graphical indicators displayed next to the relevant command buttons in the user interface. Through these indicators, consistent configuration of CMS is ensured. However, manually following the indicators can still be inefficient at times. A new assistant to the operator has therefore been developed that can automatically perform all the necessary actions in a streamlined order. If additional problems arise, the new assistant tries to automatically recover from these. With the new assistant, a run can be started from any state of the sub-systems with a single click. An ongoing run may be recovered with a single click, once the appropriate recovery action has been selected. We review the automation features of CMS Run Control and discuss the new assistant in detail including first operational experience.

  6. New Operator Assistance Features in the CMS Run Control System

    Energy Technology Data Exchange (ETDEWEB)

    Andre, J.M.; et al.

    2017-11-22

    During Run-1 of the LHC, many operational procedures have been automated in the run control system of the Compact Muon Solenoid (CMS) experiment. When detector high voltages are ramped up or down or upon certain beam mode changes of the LHC, the DAQ system is automatically partially reconfigured with new parameters. Certain types of errors such as errors caused by single-event upsets may trigger an automatic recovery procedure. Furthermore, the top-level control node continuously performs cross-checks to detect sub-system actions becoming necessary because of changes in configuration keys, changes in the set of included front-end drivers or because of potential clock instabilities. The operator is guided to perform the necessary actions through graphical indicators displayed next to the relevant command buttons in the user interface. Through these indicators, consistent configuration of CMS is ensured. However, manually following the indicators can still be inefficient at times. A new assistant to the operator has therefore been developed that can automatically perform all the necessary actions in a streamlined order. If additional problems arise, the new assistant tries to automatically recover from these. With the new assistant, a run can be started from any state of the sub-systems with a single click. An ongoing run may be recovered with a single click, once the appropriate recovery action has been selected. We review the automation features of CMS Run Control and discuss the new assistant in detail including first operational experience.

  7. Organizational environment and operator culture

    International Nuclear Information System (INIS)

    Morisseau, D.S.; Schoenfeld, I.E.

    1988-01-01

    The Nuclear Regulatory Commission has historically reviewed corporate and plant level management and organization against the criteria of NUREG-0800, The Standard Review Plan. These criteria address the organizational structure, management control, lines of authority and communication, the range and level of experience, and the availability of manpower to effectively and safely operate the facility. Now that most nuclear power plants have received their operating licenses, the emphasis for review has shifted to the day-to-day operation of the facilities. Along with this has come greater recognition that hardware and engineering systems, through vitally important, are not the only components needed for safe operation of power plants. The people who run and operate these plants are a vitally important component and are an integral part of the entire system, i.e., machinery does not operate in isolation

  8. IAEA Operational Safety Team Review Bohunice Nuclear Power Plant, Slovak Republic

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed Slovakia's Bohunice Nuclear Power Plant (BNPP) for its safety practices and has noted a series of good practices as well as recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of Slovak Republic to conduct an Operational Safety Review (OSART) of Bohunice NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the OSART team performed an in-depth operational safety review from 1 to 18 November 2010. The team was made up of experts from Belgium, Canada, China, the Czech Republic, France, Sweden, the United Kingdom and the IAEA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at BNPP conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely is under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry and Emergency Planning and Preparedness. Long Term Operation assessment has been requested by the plant in addition to the standard OSART program. The OSART team has identified good plant practices which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: BNPP has implemented a comprehensive set of technical and organizational measures which have significantly reduced the production of liquid radioactive waste; BNPP has developed an automatic transfer of dosimetry data

  9. Analysis of remote operating systems for space-based servicing operations, volume 1

    Science.gov (United States)

    1985-01-01

    A two phase study was conducted to analyze and develop the requirements for remote operating systems as applied to space based operations for the servicing, maintenance, and repair of satellites. Phase one consisted of the development of servicing requirements to establish design criteria for remote operating systems. Phase two defined preferred system concepts and development plans which met the requirements established in phase one. The specific tasks in phase two were to: (1) identify desirable operational and conceptual approaches for selected mission scenarios; (2) examine the potential impact of remote operating systems incorporated into the design of the space station; (3) address remote operating systems design issues, such as mobility, which are effected by the space station configuration; and (4) define the programmatic approaches for technology development, testing, simulation, and flight demonstration.

  10. Operational readiness reviews for restart of L reactor

    International Nuclear Information System (INIS)

    Finley, R.H.

    1984-01-01

    The L Reactor at the Savannah River Plant is being restarted after being in a standby status since 1968. Operational Readiness Reviews (ORRs) were conducted by DOE-SR and contractor personnel concurrent with the restart activity. This paper summarizes the ORR activity

  11. Operating systems for experimental physics

    International Nuclear Information System (INIS)

    Davies, H.E.

    1976-01-01

    Modern high energy physics experiments are very dependent on the use of computers and present a fairly well defined list of technical demands on them. It is therefore possible to look at the construction of a computer operating system and to see how the design choices should be made in order to make the systems as useful as possible to physics experiments or, more practically, to look at existing operating systems to see which can most easily be used to do the jobs of rapid data acquisition and checking. In these notes, operating systems are looked at from the point of view of the informed user. Emphasis is placed on systems which are intended for single processor microcomputers of the type frequently used for data acquisition applications. The principles described are, of course, equally valid for other kinds of system. (Auth.)

  12. 30 CFR 773.9 - Review of applicant, operator, and ownership and control information.

    Science.gov (United States)

    2010-07-01

    ... operator's organizational structure and ownership or control relationships. (b) We must conduct the review... and control information. 773.9 Section 773.9 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION....9 Review of applicant, operator, and ownership and control information. (a) We, the regulatory...

  13. Neurosurgical operating computerized tomographic scanner system

    International Nuclear Information System (INIS)

    Okudera, Hiroshi; Sugita, Kenichiro; Kobayashi, Shigeaki; Kimishima, Sakae; Yoshida, Hisashi.

    1988-01-01

    A neurosurgical operating computerized tomography scanner system is presented. This system has been developed for obtaining intra- and postoperative CT images in the operating room. A TCT-300 scanner (manufactured by the Toshiba Co., Tokyo) is placed in the operating room. The realization of a true intraoperative CT image requires certain improvements in the CT scanner and operating table. To adjust the axis of the co-ordinates of the motor system of the MST-7000 microsurgical operating table (manufactured by the Mizuho Ika Co., Tokyo) to the CT scanner, we have designed an interface and a precise motor system so that the computer of the CT scanner can directly control the movement of the operating table. Furthermore, a new head-fixation system has been designed for producing artifact-free intraoperative CT images. The head-pins of the head-fixation system are made of carbon-fiber bars and titanium tips. A simulation study of the total system in the operating room with the CT scanner, operating table, and head holder using a skull model yielded a degree of error similar to that in the phantom testing of the original scanner. Three patients underwent resection of a glial tumor using this system. Intraoperative CT scans taken after dural opening showed a bulging of the cortex, a shift in the central structure, and a displacement of the cortical subarachnoid spaces under the influence of gravity. With a contrast medium the edge of the surrounding brain after resection was enhanced and the residual tumor mass was demonstrated clearly. This system makes it possible to obtain a noninvasive intraoperative image in a situation where structural shifts are taking place. (author)

  14. Safety review of experiments at Albuquerque Operations Office

    International Nuclear Information System (INIS)

    Elliott, K.

    1984-01-01

    The Department of Energy (DOE) Albuquerque Operations Office is responsible for the safety overview of nuclear reactor and critical assembly facilities at Sandia National Laboratories, Los Alamos National Laboratory, and the Rocky Flats Plant. The important safety concerns with these facilities involve the complex experiments that are performed, and that is the area emphasized. A determination is made by the Albuquerque Office (AL) with assistance from DOE/OMA whether or not a proposed experiment is an unreviewed safety question. Meetings are held with the contractor to resolve and clarify questions that are generated during the review of the proposed experiment. The AL safety evaluation report is completed and any recommendations are discussed. Prior to the experiment a preoperational appraisal is performed to assure that personnel, procedures, and equipment are in readiness for operations. During the experiment, any abnormal condition is reviewed in detail to determine any safety concerns

  15. Operating Systems

    Indian Academy of Sciences (India)

    areas in which this type is useful are multimedia, virtual reality, and advanced scientific projects such as undersea exploration and planetary rovers. Because of the expanded uses for soft real-time functionality, it is finding its way into most current operating systems, including major versions of Unix and Windows NT OS.

  16. Man/terminal interaction evaluation of computer operating system command and control service concepts. [in Spacelab

    Science.gov (United States)

    Dodson, D. W.; Shields, N. L., Jr.

    1978-01-01

    The Experiment Computer Operating System (ECOS) of the Spacelab will allow the onboard Payload Specialist to command experiment devices and display information relative to the performance of experiments. Three candidate ECOS command and control service concepts were reviewed and laboratory data on operator performance was taken for each concept. The command and control service concepts evaluated included a dedicated operator's menu display from which all command inputs were issued, a dedicated command key concept with which command inputs could be issued from any display, and a multi-display concept in which command inputs were issued from several dedicated function displays. Advantages and disadvantages are discussed in terms of training, operational errors, task performance time, and subjective comments of system operators.

  17. Disk Operating System User's Guide

    Science.gov (United States)

    1972-05-01

    This document serves the purpose of bringing together in one place most of the information a user needs to use the DDP-516 Disk Operating System, (DOS). DOS is a core resident, one user, console-oriented operating system which allows the user to cont...

  18. Optimization of power system operation

    CERN Document Server

    Zhu, Jizhong

    2015-01-01

    This book applies the latest applications of new technologies topower system operation and analysis, including new and importantareas that are not covered in the previous edition. Optimization of Power System Operation covers both traditional andmodern technologies, including power flow analysis, steady-statesecurity region analysis, security constrained economic dispatch,multi-area system economic dispatch, unit commitment, optimal powerflow, smart grid operation, optimal load shed, optimalreconfiguration of distribution network, power system uncertaintyanalysis, power system sensitivity analysis, analytic hierarchicalprocess, neural network, fuzzy theory, genetic algorithm,evolutionary programming, and particle swarm optimization, amongothers. New topics such as the wheeling model, multi-areawheeling, the total transfer capability computation in multipleareas, are also addressed. The new edition of this book continues to provide engineers andac demics with a complete picture of the optimization of techn...

  19. Elastic and inelastic methods of piping systems analysis: a preliminary review

    International Nuclear Information System (INIS)

    Reich, M.; Esztergar, E.P.; Spence, J.; Boyle, J.; Chang, T.Y.

    1975-02-01

    A preliminary review of the methods used for elastic and inelastic piping system analysis is presented. The following principal conclusions are reached: techniques for the analysis of complex piping systems operating in the high temperature creep regime should be further developed; accurate analysis of a complete pipework system in creep using the ''complete shell finite element methods'' is not feasible at the present, and the ''reduced shell finite element method'' still requires excessive computer time and also requires further investigation regarding the compatibility problems associated with the pipe bend element, particularly when applied to cases involving general loading conditions; and with the current size of proposed high temperature systems requiring the evaluation of long-term operating life (30 to 40 years), it is important to adopt a simplified analysis method. A design procedure for a simplified analysis method based on currently available techniques applied in a three-stage approach is outlined. The work required for implementation of these procedures together with desirable future developments are also briefly discussed. Other proposed simplified approximations also are reviewed in the text. 101 references. (U.S.)

  20. Comparison of Management-Operational Efficiency of Agricultural Machinery Operating Systems (Case Study Alborz Province

    Directory of Open Access Journals (Sweden)

    A Omidi

    2017-10-01

    Full Text Available Introduction Measuring the efficiency of operating systems in comparison with the methods of comparing the performance of systems explains the various dimensions of issues such as, the lack of full use of agricultural machinery capacity, improper selection of machine, incorrect use of machinery, ownership, etc.. Any improvement in operating system conditions reduces costs,, consumption of inputs, increases the efficiency of production factors and consequently reduces the price and increases agricultural profitability. The main objective of this research is to compare the operational-management efficiency of operating systems in Alborz province and comparison of managerial and operational efficiency of agricultural machinery farming systems by calculating the efficiency of its major components in agricultural machinery farming systems including efficiency, social, economic, technical-operational and managerial and ranking them in order to understand the optimal model of agricultural machinery systems. Materials and Methods This research is a survey study.The study population was beneficiaries of agricultural machinery in the Alborz province which in the multi-stage random sample was determined. Alborz province has 31,438 agricultural operations, of which 543 are exploited agricultural machinery. Cochran formula was used to determine sample size. Since, Cronbach's alpha coefficient greater than 0.7 was obtained by questionnaire, the reliability of the questionnaires was assessed as desirable. To calculate the efficiency the component data were extracted from 4 specialized questionnaires after the initial examination and encoding, then they were analyzed using the software SPSS, MCDM Engine. TOPSIS techniques were used for ranking managerial performance operating system for operating agricultural machinery Alborz province. Results and Discussion The results showed that social efficiency of dedicated-professional operation with an average of 6.6 had

  1. Development of advanced automatic operation system for nuclear ship. 1. Perfect automatic normal operation

    International Nuclear Information System (INIS)

    Nakazawa, Toshio; Yabuuti, Noriaki; Takahashi, Hiroki; Shimazaki, Junya

    1999-02-01

    Development of operation support system such as automatic operating system and anomaly diagnosis systems of nuclear reactor is very important in practical nuclear ship because of a limited number of operators and severe conditions in which receiving support from others in a case of accident is very difficult. The goal of development of the operation support systems is to realize the perfect automatic control system in a series of normal operation from the reactor start-up to the shutdown. The automatic control system for the normal operation has been developed based on operating experiences of the first Japanese nuclear ship 'Mutsu'. Automation technique was verified by 'Mutsu' plant data at manual operation. Fully automatic control of start-up and shutdown operations was achieved by setting the desired value of operation and the limiting value of parameter fluctuation, and by making the operation program of the principal equipment such as the main coolant pump and the heaters. This report presents the automatic operation system developed for the start-up and the shutdown of reactor and the verification of the system using the Nuclear Ship Engineering Simulator System. (author)

  2. Integrated monitoring and reviewing systems for the Rokkasho Spent Fuel Receipt and Storage Facility

    International Nuclear Information System (INIS)

    Yokota, Yasuhiro; Ishikawa, Masayuki; Matsuda, Yuji

    1998-01-01

    The Rokkasho Spent Fuel Receipt and Storage (RSFS) Facility at the Rokkasho Reprocessing Plant (RRP) in Japan is expected to begin operations in 1998. Effective safeguarding by International Atomic Energy Agency (IAEA) and Japan Atomic Energy Bureau (JAEB) inspectors requires monitoring the time of transfer, direction of movement, and number of spent fuel assemblies transferred. At peak throughput, up to 1,000 spent fuel assemblies will be accepted by the facility in a 90-day period. In order for the safeguards inspector to efficiently review the resulting large amounts of inspection information, an unattended monitoring system was developed that integrates containment and surveillance (C/S) video with radiation monitors. This allows for an integrated review of the facility's radiation data, C/S video, and operator declaration data. This paper presents an outline of the integrated unattended monitoring hardware and associated data reviewing software. The hardware consists of a multicamera optical surveillance (MOS) system radiation monitoring gamma-ray and neutron detector (GRAND) electronics, and an intelligent local operating network (ILON). The ILON was used for time synchronization and MOS video triggers. The new software consists of a suite of tools, each one specific to a single data type: radiation data, surveillance video, and operator declarations. Each tool can be used in a stand-alone mode as a separate ion application or configured to communicate and match time-synchronized data with any of the other tools. A data summary and comparison application (Integrated Review System [IRS]) coordinates the use of all of the data-specific review tools under a single-user interface. It therefore automates and simplifies the importation of data and the data-specific analyses

  3. A review of healthy condition for reactor operators of NPP

    International Nuclear Information System (INIS)

    Zhang Chi; Yang Di; Zhu Lixin; Zhou Limin

    2008-01-01

    Physical health is one of fundamental elements and the necessary qualification for holding operator license or senior operator license of a nuclear power plant issued by NNSA. Based upon requirements for healthy qualification of reactor operators in nuclear safety regulations and some new issued regulations, especially some involved national standard (GB), review direction, relevant contents and criteria were described, and some suggestions were provided in this paper. (authors)

  4. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  5. Development of the operator training system using computer graphics. Pt. 2. Operator behavior CG system and its applications

    International Nuclear Information System (INIS)

    Sasou, Kunihide; Ebisu, Mitsuhiro; Takano, Kenichi; Watabe, Kazuyuki

    2003-01-01

    In training, it has been important to show good performance of operators dealing with abnormal operating; condition simulated by a training simulator. Video-taping of the scenario-based performance by instructors of a training center is the most common way. However, it is difficult for the experienced instructors to show good performance due to the stress of being video-taped. Therefore, the authors developed a system named Operator Behavior Computer Graphic System (OBCGS) to computer-graphically show the behavior of operators. The input data of this system are data on operation, watching, walking and utterances with time, objects of operation and watching, contents of their behavior, etc. The system temporally uses the output data of Man Machine Simulator developed by CRIEPI. OBCGS has 3 kinds of user interfaces. The first one computer-graphically shows 3 operators and one shift supervisor behaving in the control room from a bird's eye viewpoint. The second one has multi windows to show details of computer graphics of operators and control panels. The last one shows the history of operations, warnings and utterance. The system shows reasonable computer graphics in quality from the viewpoint of showing good performance of operations. This report also describes how to use the OBCGS and ways of application to the operator training. (author)

  6. Operational Management System for Regulated Water Systems

    Science.gov (United States)

    van Loenen, A.; van Dijk, M.; van Verseveld, W.; Berger, H.

    2012-04-01

    Most of the Dutch large rivers, canals and lakes are controlled by the Dutch water authorities. The main reasons concern safety, navigation and fresh water supply. Historically the separate water bodies have been controlled locally. For optimizating management of these water systems an integrated approach was required. Presented is a platform which integrates data from all control objects for monitoring and control purposes. The Operational Management System for Regulated Water Systems (IWP) is an implementation of Delft-FEWS which supports operational control of water systems and actively gives advice. One of the main characteristics of IWP is that is real-time collects, transforms and presents different types of data, which all add to the operational water management. Next to that, hydrodynamic models and intelligent decision support tools are added to support the water managers during their daily control activities. An important advantage of IWP is that it uses the Delft-FEWS framework, therefore processes like central data collection, transformations, data processing and presentation are simply configured. At all control locations the same information is readily available. The operational water management itself gains from this information, but it can also contribute to cost efficiency (no unnecessary pumping), better use of available storage and advise during (water polution) calamities.

  7. Operability design review of prototype large breeder reactor (PLBR) designs. Final report, September 1981

    International Nuclear Information System (INIS)

    Beakes, J.H.; Ehman, J.R.; Jones, H.M.; Kinne, B.V.T.; Price, C.M.; Shores, S.P.; Welch, J.K.

    1981-09-01

    Prototype Large Breeder Reactor (PLBR) designs were reviewed by personnel with extensive power plant operations experience. Fourteen normal and off-normal events, such as startup, shutdown, refueling, reactor scram and loss of feedwater, were evaluated using an operational evaluation methodology which is designed to facilitate talk-through sessions on operational events. Human factors engineers participated in the review and assisted in developing and refining the review methodologies. Operating experience at breeder reactor facilities such as Experimental Breeder Reactor-II (EBR-II), Enrico Fermi Atomic Power Plant - Unit 1, and the Fast Flux Test Facility (FFTF) was gathered, analyzed, and used to determine whether lessons learned from operational experience had been incorporated into the PLBR designs. This eighteen month effort resulted in approximately one hundred specific recommendations for improving the operability of PLBR designs

  8. CANDU 9 operator plant display system

    International Nuclear Information System (INIS)

    Trueman, R.; Webster, A.; MacBeth, M.J.

    1997-01-01

    To meet evolving client and regulatory needs, AECL has adopted an evolutionary approach to the design of the CANDU 9 control centre. That is, the design incorporates feedback from existing stations, reflects the growing diversity in the roles and responsibilities of the operating staff, and reduces costs associated with plant capital and operations, maintenance and administration (OM and A), through the appropriate introduction of new technologies. Underlying this approach is a refined engineering design process that cost-effectively integrates operational feedback and human factors engineering to define the operating staff information and information presentation requirements. Based on this approach, the CANDU 9 control centre will provide utility operating staff with the means to achieve improved operations and reduced OM and A costs. One of the design features that will contribute to the improved operational capabilities of the control centre is a new Plant Display System (PDS) that is separate from the digital control system. The PDS will be used to implement non-safety panel, and console video display systems within the CANDU 9 main control room (MCR). This paper presents a detailed description of the CANDU 9 Plant Display System and features that provide increased operational capabilities. (author)

  9. Management systems in production operations

    International Nuclear Information System (INIS)

    Walters, K.B.; Henderson, G.

    1993-01-01

    The Cullen Enquiry into the Piper Alpha disaster in the U.K. North Sea recommended that an operator should formally present it's company Management System and demonstrate how safety is achieved throughout the life cycle of a platform, from design through operation to abandonment. Brunei Shell Petroleum has prepared a corporate level Safety Management System. As part of Safety Case work, the corporate system is being extended to include the development of specific Management Systems with particular emphasis on offshore production operations involving integrated oil and gas facilities. This paper will describe the development of Management Systems, which includes an intensive Business Process Analysis and will comment upon it's applicability and relationship to ISO 9000. The paper will further describe the applicability and benefits of Management Systems and offer guidance on required effort. The paper will conclude that development of structured Management Systems for safety critical business processes is worthwhile but prioritization of effort will be necessary. As such the full adoption of Management Systems will be directional in nature

  10. A review on prognostic techniques for non-stationary and non-linear rotating systems

    Science.gov (United States)

    Kan, Man Shan; Tan, Andy C. C.; Mathew, Joseph

    2015-10-01

    The field of prognostics has attracted significant interest from the research community in recent times. Prognostics enables the prediction of failures in machines resulting in benefits to plant operators such as shorter downtimes, higher operation reliability, reduced operations and maintenance cost, and more effective maintenance and logistics planning. Prognostic systems have been successfully deployed for the monitoring of relatively simple rotating machines. However, machines and associated systems today are increasingly complex. As such, there is an urgent need to develop prognostic techniques for such complex systems operating in the real world. This review paper focuses on prognostic techniques that can be applied to rotating machinery operating under non-linear and non-stationary conditions. The general concept of these techniques, the pros and cons of applying these methods, as well as their applications in the research field are discussed. Finally, the opportunities and challenges in implementing prognostic systems and developing effective techniques for monitoring machines operating under non-stationary and non-linear conditions are also discussed.

  11. Operational stressors on physical performance in special operators and countermeasures to improve performance: a review of the literature.

    Science.gov (United States)

    O'Hara, Reginald; Henry, Amy; Serres, Jennifer; Russell, Dawn; Locke, Robert

    2014-01-01

    Military training in elite warfighters (e.g., U.S. Army Rangers, Navy SEALs, and U.S. Air Force Battlefield Airmen) is challenging and requires mental and physical capabilities that are akin to that of professional athletes. However, unlike professional athletes, the competitive arena is the battlefield, with winning and losing replaced by either life or death. The rigors of both physical training and prolonged deployments without adequate rest and food intake can compromise physical performance. Therefore, the primary purpose of this effort was to identify occupational stressors on the physical performance of Special Operators during training and while on missions. The secondary purpose was to suggest specific countermeasures to reduce or prevent significant decrements in physical performance and reduce musculoskeletal injuries. A search of the literature for 2000?2012 was performed using the Air Force Institute of Technology search engines (i.e., PubMed and ProQuest). There were 29 articles located and selected that specifically addressed the primary and secondary purposes of this literature review. The remaining 32 of 61 referenced articles were reviewed after initial review of the primary literature. This review indicates that operational stress (e.g., negative energy balance, high-energy expenditure, sleep deprivation, environmental extremes, heavy load carriage, etc.) associated with rigorous training and sustained operations negatively affects hormonal levels, lean muscle mass, and physical performance of Special Operators. The number of musculoskeletal injuries also increases as a result of these stressors. Commanders may use simple field tests to assess physical decrements before and during deployment to effectively plan for missions. Specific countermeasures for these known decrements are lacking in the scientific literature. Therefore, future researchers should focus on studying specific physical training programs, equipment, and other methods to

  12. Department of Energy Operational Readiness Review for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-12-01

    The U.S. Department of Energy (DOE) has completed an Operational Readiness Review (ORR) for the restart of Contact Handled (CH) waste emplacement at the Waste Isolation Pilot Plant (WIPP) located near Carlsbad, New Mexico. The ORR team assessed the readiness of Nuclear Waste Partnership, LLC (NWP) to manage and perform receipt through CH waste emplacement, and associated waste handling and management activities, including the ability of the National TRU Program (NTP) to evaluate the waste currently stored at the WIPP site against the revised and enhanced Waste Acceptance Criteria (WAC). Field work for this review began on November 14, 2015 and was completed on November 30, 2016. The DOE ORR was conducted in accordance with the Department of Energy Operational Readiness Review Implementation Plan for the Waste Isolation Pilot Plant, dated November 8, 2016, and DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities. The review activities included personnel interviews, record reviews, direct observation of operations and maintenance demonstrations, and observation of multiple operational and emergency drills/exercises. The DOE ORR also evaluated the adequacy of the contractor’s ORR (CORR) and the readiness of the DOE Carlsbad field Office (CBFO) to oversee the startup and execution of CH waste emplacement activities at the WIPP facility. The WIPP facility is categorized as a Hazard Category 2 DOE Nonreactor Nuclear Facility for all surface and Underground (UG) operations per DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports. In addition, the WIPP experienced two events in February, 2014 that resulted in Accident Investigations being performed in accordance with the requirements of DOE Order 225.1B, Accident Investigations. Based upon the results of the accident investigations and hazard categorization of the facility, the team placed

  13. Operating experience of the automatic technological control system at the Kolsk NPP

    International Nuclear Information System (INIS)

    Volkov, A.P.; Ignatenko, E.I.; Kolomtsev, Yu.V.; Mel'nikov, E.F.; Trofimov, B.A.

    1981-01-01

    Briefly reviewed is operating experience of the automatic control systems of the kolsk NPP (KNPP) power units, where measuring technique of the neutron flux ''Iney'', ARM-4 power regulator, automatic turbine start-up system ATS are used. The main shortcomings of the technological process automatic control system (ACS) and ways of their removal are considered. It is noted that the KNPP ACS performs only limited start-up functions of the basic equipment and reactor power control as well as partially protection functions at instant loading drops and switch-off of the main circulating pump [ru

  14. Integrated ADIOS-IGENPRO operator advisory support system

    International Nuclear Information System (INIS)

    Lee, Dong Young; Park, J. H.; Kim, J. T.; Kim, C. H.; Park, W. M.; Hwang, I. K.; Cheon, S. W.; Song, S. J.

    2001-05-01

    The I and C systems and control rooms of nuclear power plants have been constructed by using the automatic control concept and changed to computer-based systems in nowadays. For Increase of an automation and CRT, the role of operators is changed to monitor the condition of the nuclear power plants. Therefore, the information that is offered to operators has to integrate in order for operator to understand the hole condition of plants. In commercial nuclear plants, raw data of sensors and components are shown in a control room. So, operators can not diagnose the condition of plants correctly. For a development of an integrated operator aid system which contain an alarm processing system and a fault diagnosis system, we integrated IGENPRO of ANL(Argonne National Lab.) and ADIOS of KAERI (Korea Atomic Energy Institute). IGENPRO is a fault diagnosis system contains three module such as PROTREN, PRODIAG and PROTREN. ADIOS is an alarm processing system that informs operators of important alarms. The integrated operator advisory support system developed in the research is composed of an alarm processing module and a fault diagnosis module. The alarm processing module shows important alarms to operator by using dynamic alarm filtering methods. The fault diagnosis module shows the cause of faults of sensors and hardwares

  15. Integrated ADIOS-IGENPRO operator advisory support system

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dong Young; Park, J. H.; Kim, J. T.; Kim, C. H.; Park, W. M.; Hwang, I. K.; Cheon, S. W.; Song, S. J

    2001-05-01

    The I and C systems and control rooms of nuclear power plants have been constructed by using the automatic control concept and changed to computer-based systems in nowadays. For Increase of an automation and CRT, the role of operators is changed to monitor the condition of the nuclear power plants. Therefore, the information that is offered to operators has to integrate in order for operator to understand the hole condition of plants. In commercial nuclear plants, raw data of sensors and components are shown in a control room. So, operators can not diagnose the condition of plants correctly. For a development of an integrated operator aid system which contain an alarm processing system and a fault diagnosis system, we integrated IGENPRO of ANL(Argonne National Lab.) and ADIOS of KAERI (Korea Atomic Energy Institute). IGENPRO is a fault diagnosis system contains three module such as PROTREN, PRODIAG and PROTREN. ADIOS is an alarm processing system that informs operators of important alarms. The integrated operator advisory support system developed in the research is composed of an alarm processing module and a fault diagnosis module. The alarm processing module shows important alarms to operator by using dynamic alarm filtering methods. The fault diagnosis module shows the cause of faults of sensors and hardwares.

  16. 47 CFR 32.2220 - Operator systems.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Operator systems. 32.2220 Section 32.2220 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2220 Operator systems...

  17. Lessons Learned from Sandia National Laboratories' Operational Readiness Review of the Annular Core Research Reactor (ACRR)

    International Nuclear Information System (INIS)

    Bendure, Albert O.; Bryson, James W.

    1999-01-01

    The Sandia ACRR (a Hazard Category 2 Nuclear Reactor Facility) was defueled in June 1997 to modify the reactor core and control system to produce medical radioisotopes for the Department of Energy (DOE) Isotope Production Program. The DOE determined that an Operational Readiness Review (ORR) was required to confirm readiness to begin operations within the revised safety basis. This paper addresses the ORR Process, lessons learned from the Sandia and DOE ORRS of the ACRR, and the use of the ORR to confirm authorization basis implementation

  18. Review of power sources for Alaska DOT & PF road weather information systems (RWIS) : phase I.

    Science.gov (United States)

    2014-06-01

    This report documents the findings related to a review of power sources for six off-grid Road Weather Information Systems (RWIS) in : Alaska. Various power sources were reviewed as a means of reliably operating the off-grid RWIS sites throughout the ...

  19. Intelligent operation system for nuclear power plants

    International Nuclear Information System (INIS)

    Morioka, Toshihiko; Fukumoto, Akira; Suto, Osamu; Naito, Norio.

    1987-01-01

    Nuclear power plants consist of many systems and are operated by skillful operators with plenty of knowledge and experience of nuclear plants. Recently, plant automation or computerized operator support systems have come to be utilized, but the synthetic judgment of plant operation and management remains as human roles. Toshiba is of the opinion that the activities (planning, operation and maintenance) should be integrated, and man-machine interface should be human-friendly. We have begun to develop the intelligent operation system aiming at reducing the operator's role within the fundamental judgment through the use of artificial intelligence. (author)

  20. Operating system design the Xinu approach, Linksys version

    CERN Document Server

    Press, CRC

    2011-01-01

    Introduction and OverviewOperating SystemsApproach Used In The TextA Hierarchical DesignThe Xinu Operating SystemWhat An Operating System Is NotAn Operating System Viewed From The OutsideRemainder Of The TextConcurrent Execution And Operating System ServicesProgramming Models For Multiple ActivitiesOperating System ServicesConcurrent Processing Concepts And TerminologyDistinction Between Sequential And Concurrent ProgramsMultiple Processes Sharing A Single Piece Of CodeProcess Exit And Process TerminationShared Memory, Race Conditions, And SynchronizationSemaphores And Mutual ExclusionType Nam

  1. Development of JRR-4 operation support system

    International Nuclear Information System (INIS)

    Takahashi, Hiroki; Yamamoto, Kazuyoshi; Yoritsune, Tsutomu; Arai, Nobuyoshi; Birumachi, Takashi

    1999-03-01

    The Japan Research Reactor No.4 (JRR-4) is a light water moderated and cooled, graphite reflected, pool-type reactor with the thermal output of 3500 kW. In February 1996, a work on core modification from high-enriched fuels to low-enriched ones was started and the work on modification was completed in May 1998. As a part of the work, Operation Support System (OSS) was adopted for the purpose of reducing load of operator, preventing operator's error and supplying operation data to users. In this paper, JRR-4 Operation Support System's configuration, characteristics and development process are described. OSS consists mainly of a workstation (WS), μXL and Personal Computer (PC). WS is used for collection of operation data. μXL is used for cooling system control and PC is used for operators' support. All of the program applications used in WS, μXL and PC are designed to make sure of high flexibility for the demands on modification from operators and new operation modes. The result of adopting this system, the consolidation monitoring, automation of part of reactor operation and data management were realized. In addition, the cooling control system was compacted. (author)

  2. Operating The Central Process Systems At Glenn Research Center

    Science.gov (United States)

    Weiler, Carly P.

    2004-01-01

    As a research facility, the Glenn Research Center (GRC) trusts and expects all the systems, controlling their facilities to run properly and efficiently in order for their research and operations to occur proficiently and on time. While there are many systems necessary for the operations at GRC, one of those most vital systems is the Central Process Systems (CPS). The CPS controls operations used by GRC's wind tunnels, propulsion systems lab, engine components research lab, and compressor, turbine and combustor test cells. Used widely throughout the lab, it operates equipment such as exhausters, chillers, cooling towers, compressors, dehydrators, and other such equipment. Through parameters such as pressure, temperature, speed, flow, etc., it performs its primary operations on the major systems of Electrical Dispatch (ED), Central Air Dispatch (CAD), Central Air Equipment Building (CAEB), and Engine Research Building (ERB). In order for the CPS to continue its operations at Glenn, a new contract must be awarded. Consequently, one of my primary responsibilities was assisting the Source Evaluation Board (SEB) with the process of awarding the recertification contract of the CPS. The job of the SEB was to evaluate the proposals of the contract bidders and then to present their findings to the Source Selecting Official (SSO). Before the evaluations began, the Center Director established the level of the competition. For this contract, the competition was limited to those companies classified as a small, disadvantaged business. After an industry briefing that explained to qualified companies the CPS and type of work required, each of the interested companies then submitted proposals addressing three components: Mission Suitability, Cost, and Past Performance. These proposals were based off the Statement of Work (SOW) written by the SEB. After companies submitted their proposals, the SEB reviewed all three components and then presented their results to the SSO. While the

  3. To what extent do site-based training, mentoring, and operational research improve district health system management and leadership in low- and middle-income countries: a systematic review protocol.

    Science.gov (United States)

    Belrhiti, Zakaria; Booth, Andrew; Marchal, Bruno; Verstraeten, Roosmarijn

    2016-04-27

    District health managers play a key role in the effectiveness of decentralized health systems in low- and middle-income countries. Inadequate management and leadership skills often hamper their ability to improve quality of care and effectiveness of health service delivery. Nevertheless, significant investments have been made in capacity-building programmes based on site-based training, mentoring, and operational research. This systematic review aims to review the effectiveness of site-based training, mentoring, and operational research (or action research) on the improvement of district health system management and leadership. Our secondary objectives are to assess whether variations in composition or intensity of the intervention influence its effectiveness and to identify enabling and constraining contexts and underlying mechanisms. We will search the following databases: MEDLINE, PsycInfo, Cochrane Library, CRD database (DARE), Cochrane Effective Practice and Organisation of Care (EPOC) group, ISI Web of Science, Health Evidence.org, PDQ-Evidence, ERIC, EMBASE, and TRIP. Complementary search will be performed (hand-searching journals and citation and reference tracking). Studies that meet the following PICO (Population, Intervention, Comparison, Outcome) criteria will be included: P: professionals working at district health management level; I: site-based training with or without mentoring, or operational research; C: normal institutional arrangements; and O: district health management functions. We will include cluster randomized controlled trials, controlled before-and-after studies, interrupted time series analysis, quasi-experimental designs, and cohort and longitudinal studies. Qualitative research will be included to contextualize findings and identify barriers and facilitators. Primary outcomes that will be reported are district health management and leadership functions. We will assess risk of bias with the Cochrane Collaboration's tools for randomized

  4. Making the connection: The B.C. Hydro electric system and how it is operated

    International Nuclear Information System (INIS)

    1993-01-01

    British Columbia Hydro supplies electric energy to 93% of the province's population through an integrated electric system. Of the electricity supplied, 95% is generated at 29 hydroelectric plants, with the remainder coming from thermal plants burning fossil fuels. BC Hydro's high voltage transmission and distribution network consists of 17,600 km of lines 60 kV and above and 51,400 km of lines below 60 kV. A description of system operations begins with the principles of hydroelectric generation, with a brief note on thermal generation for peaking or short-term energy production. Non-power operations measures designed to minimize environmental impacts and enhance social benefits are also outlined along with electricity trade with other provinces and the USA. Planning of long- and short-term system operations is also reviewed. An analysis of system components is presented for the Peace, Columbia, Lower Mainland/Coastal/Fraser, and Vancouver Island regions. Finally, information is given on the 29 hydroelectric and 3 thermal plants, including drainage basin, reservoir description and map, inflow, capacity, turbine type, storage, operating constraints, and average energy capability. 51 figs

  5. A COMPUTERIZED OPERATOR SUPPORT SYSTEM PROTOTYPE

    Energy Technology Data Exchange (ETDEWEB)

    Thomas A. Ulrich; Roger Lew; Ronald L. Boring; Ken Thomas

    2015-03-01

    A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. A prototype COSS was developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, piping and instrumentation diagram system representations, and a recommender module for mitigation actions. The initial version of the prototype is now operational at the Idaho National Laboratory using the Human System Simulation Laboratory.

  6. A distributed real-time operating system

    International Nuclear Information System (INIS)

    Tuynman, F.; Hertzberger, L.O.

    1984-07-01

    A distributed real-time operating system, Fados, has been developed for an embedded multi-processor system. The operating system is based on a host target approach and provides for communication between arbitrary processes on host and target machine. The facilities offered are, apart from process communication, access to the file system on the host by programs on the target machine and monitoring and debugging of programs on the target machine from the host. The process communication has been designed in such a way that the possibilities are the same as those offered by the Ada programming language. The operating system is implemented on a MC 68000 based multiprocessor system in combination with a Unix host. (orig.)

  7. Operator role definition and human-system integration

    International Nuclear Information System (INIS)

    Knee, H.E.; Schryver, J.C.

    1989-01-01

    This paper discusses operator role definition and human-system integration from a perspective of systems engineering and allocation of functions. Current and traditional allocation of tasks/functions can no longer by applied to systems that are significantly more sophisticated and dynamic than current system designs. For such advanced and automated designs, explicit attention must be given to the role of the operator in order to facilitate efficient system performance. Furthermore, such systems will include intelligent automated systems which will support the cognitive activities of the operator. If such systems share responsibility and control with the human operator, these computer-based assistants/associates should be viewed as intelligent team members. As such, factors such as trust, intentions, and expectancies, among team members must be considered by the systems designer. Such design considerations are discussed in this paper. This paper also discusses the area of dynamic allocation of functions, and the need for models of the human operator in support of machine forecast of human performance. The Integrated Reactor Operator/System (INTEROPS) model is discussed as an example of a cognitive model capable of functioning beyond a rule-based behavioral structure

  8. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    Science.gov (United States)

    Milana; Khan, M. K.; Munive, J. E.

    2014-07-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective.

  9. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    International Nuclear Information System (INIS)

    Milana; Khan, M K; Munive, J E

    2014-01-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective

  10. Application of expert system to nuclear power plant operation and guidance system

    International Nuclear Information System (INIS)

    Goto, M.; Takada, Y.

    1990-01-01

    For a nuclear power plant, it is important that an expert system supplies useful information to the operator to meet the increasing demand for high-level plant operation. It is difficult to build a user-friendly expert system that supplies useful information in real time using existing general-purpose expert system shells. Therefore a domain-specific expert system shell with a useful knowledge representation for problem-solving in nuclear power plant operation was selected. The Plant Table (P/T) representation format was developed for description of a production system for nuclear power plant operation knowledge. The P/T consists of plant condition representation designed to process multiple inputs and single output. A large number of operation inputs for several plant conditions are divided into 'timing conditions', 'preconditions' and 'completion conditions' to facilitate knowledge-base build-up. An expert system for a Nuclear Power Plant Operation and Guidance System utilizing the P/T was developed to assist automatic plant operation and surveillance test operation. In these systems, automatic plant operation signals to the plant equipment and operation guidance messages to the operators are both output based on the processing and assessment of plant operation conditions by the P/T. A surveillance test procedure guide for major safety-related systems, such as those for emergency core cooling systems, is displayed on a CRT (Cathode Ray Tube) and test results are printed out. The expert system for a Nuclear Power Plant Operation and Guidance System has already been successfully applied to Japanese BWR plants

  11. Operator support system for nuclear power plants

    International Nuclear Information System (INIS)

    Mori, Nobuyuki; Tai, Ichiro; Sudo, Osamu; Naito, Norio.

    1987-01-01

    The nuclear power generation in Japan maintains the high capacity factor, and its proportion taken in the total generated electric power exceeded 1/4, thus it has become the indispensable energy source. Recently moreover, the nuclear power plants which are harmonious with operators and easy to operate are demanded. For realizing this, the technical development such as the heightening of operation watching performance, the adoption of automation, and the improvement of various man-machine systems for reducing the burden of operators has been advanced by utilizing electronic techniques. In this paper, the trend of the man-machine systems in nuclear power plants, the positioning of operation support system, the support in the aspects of information, action and knowledge, the example of a new central control board, the operation support system using a computer, an operation support expert system and the problems hereafter are described. As the development of the man-machine system in nuclear power plants, the upgrading from a present new central control board system PODIA through A-PODIA, in which the operational function to deal with various phenomena arising in plants and safety control function are added, to 1-PODIA, in which knowledge engineering technology is adopted, is expected. (Kako, I.)

  12. Columbia River system operation review: Final environmental impact statement. Appendix R, Pacific Northwest Coordination agreement (PNCA)

    International Nuclear Information System (INIS)

    1995-11-01

    Currently, the Federal government coordinates the planning and operation of the Federal Columbia River Power System (FCRPS) with projects owned and operated by the region's non-Federal hydrogenerating utilities pursuant to the Pacific North-west Coordination Agreement (PNCA). The Bureau of Reclamation (Reclamation), the Corps of Engineers (Corps), and the Bonneville Power Administration (BPA) are parties to the PNCA on behalf of the government of the United States. The PNCA is a complex agreement that provides an opportunity for the region's power producers to maximize the power system's reliability and economy while meeting their multiple-use objectives. The PNCA does not dictate the operation of the resources it coordinates. It is essentially an accounting mechanism that exchanges the power produced among the parties in order to improve the reliability of the system and reduce regional power costs. Project owners retain complete autonomy to operate as needed to meet their multiple-use requirements. The PNCA was executed in 1964 as an important component of regional plans to maximize the Northwest's hydro resource capability. Maximization also included the development of storage projects on the Columbia River in Canada pursuant to the terms of the 1964 Columbia River Treaty. Because of the link between power coordination and Treaty issues, the current parties to the PNCA, currently are contemplating entering into a replacement or renewed power coordination agreement. Because the power coordination agreement is a consensual arrangement, its ultimate provisions must be acceptable to all of its signatories. This Appendix R to the Final Environmental Impact Statement of the Columbia River System is a presentation of the Pacific North-west Coordination Agreement

  13. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  14. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  15. Two operating modes for turbocharger system

    International Nuclear Information System (INIS)

    Bayomi, Nazih N.; Abd El-Maksoud, Rafea M.

    2012-01-01

    Highlights: ► A turbocharger system that operates in power assisted mode is introduced. ► The parameters affecting performance of the turbocharger is presented. ► Different operational charts for turbocharger are presented. ► The parametric study is helpful guide to determine turbocharger dimensioning. - Abstract: The present paper introduces a turbocharger system that operates in two different modes according to turbocharging requirements. In the first mode, the turbocharger is operating with power assistance at lower engine speeds where the power of the exhaust gases is insufficient. Thereafter, the second mode is switched leading the compressor and the turbine of the turbocharger to rotate separately for best performance. Analysis is presented to find out the parameters affecting the operation of the turbocharger and their values to achieve enhanced turbocharger performance with high efficient impellers. The parameters studied are based on data of the turbocharger operating conditions and the operational requirements of the engine. The analysis considers the turbocharger system, its turbine and its compressor. The operational charts demonstrate the simulated results for two operating modes. This study is helpful as a guide to determine the turbocharger dimensioning and blade profile assignment without using any given blade dimensional value.

  16. ATLAS Maintenance and Operation management system

    CERN Document Server

    Copy, B

    2007-01-01

    The maintenance and operation of the ATLAS detector will involve thousands of contributors from 170 physics institutes. Planning and coordinating the action of ATLAS members, ensuring their expertise is properly leveraged and that no parts of the detector are understaffed or overstaffed will be a challenging task. The ATLAS Maintenance and Operation application (referred to as Operation Task Planner inside the ATLAS experiment) offers a fluent web based interface that combines the flexibility and comfort of a desktop application, intuitive data visualization and navigation techniques, with a lightweight service oriented architecture. We will review the application, its usage within the ATLAS experiment, its underlying design and implementation.

  17. Radon in water aeration system operational performance

    International Nuclear Information System (INIS)

    Lamarre, B.L.

    1990-01-01

    North East Environmental Products, Inc. is a manufacturer of residential scale aeration systems for removal of radon and volatile organic chemicals from private water supplies. This paper is a review of the operational history of residential scale point of entry (POE) radon aeration systems. Emphasis is placed on the difficulties and solutions encountered in actual installations caused by both mechanical difficulties and water quality parameters. A summary of radon reduction efficiency is presented for wells with radon concentrations from 21,000 to 2,600,000 pCi/L. A discussion of customer concerns and attitudes is presented along with other areas for further technical improvement. Training techniques for dealers and installers are also discussed. An update of the current status of the radon in water industry includes current sales volumes as compared to the potential market and an update on the radon in water MCL standard setting process from an industry perspective

  18. Network operating system focus technology

    Science.gov (United States)

    1985-01-01

    An activity structured to provide specific design requirements and specifications for the Space Station Data Management System (DMS) Network Operating System (NOS) is outlined. Examples are given of the types of supporting studies and implementation tasks presently underway to realize a DMS test bed capability to develop hands-on understanding of NOS requirements as driven by actual subsystem test beds participating in the overall Johnson Space Center test bed program. Classical operating system elements and principal NOS functions are listed.

  19. 15 CFR 752.14 - System reviews.

    Science.gov (United States)

    2010-01-01

    ...) Other reviews. BIS may require an SCL holder or consignee to submit to its office a list of all sales... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false System reviews. 752.14 Section 752.14... LICENSE § 752.14 System reviews. (a) Post-license system reviews. BIS may conduct system reviews of the...

  20. The development and evaluation of guidelines for the review of advanced human-system interfaces

    International Nuclear Information System (INIS)

    O'Hara, J.M.; Wachtel, J.

    1992-01-01

    Advanced control rooms for future nuclear power plants are being designed utilizing computer-based technologies. The US Nuclear Regulatory Commission reviews the human engineering aspects of such control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported in order to protect public health and safety. This paper describes a general approach to advanced human-system interface review, development of human factors guidelines to support NRC safety reviews of advanced systems, and the results of a guideline test and evaluation program

  1. Short-Term Wind Speed Forecasting for Power System Operations

    KAUST Repository

    Zhu, Xinxin

    2012-04-01

    The emphasis on renewable energy and concerns about the environment have led to large-scale wind energy penetration worldwide. However, there are also significant challenges associated with the use of wind energy due to the intermittent and unstable nature of wind. High-quality short-term wind speed forecasting is critical to reliable and secure power system operations. This article begins with an overview of the current status of worldwide wind power developments and future trends. It then reviews some statistical short-term wind speed forecasting models, including traditional time series approaches and more advanced space-time statistical models. It also discusses the evaluation of forecast accuracy, in particular, the need for realistic loss functions. New challenges in wind speed forecasting regarding ramp events and offshore wind farms are also presented. © 2012 The Authors. International Statistical Review © 2012 International Statistical Institute.

  2. Hierarchical Control for Optimal and Distributed Operation of Microgrid Systems

    DEFF Research Database (Denmark)

    Meng, Lexuan

    manages the power flow with external grids, while the economic and optimal operation of MGs is not guaranteed by applying the existing schemes. Accordingly, this project dedicates to the study of real-time optimization methods for MGs, including the review of optimization algorithms, system level...... mathematical modeling, and the implementation of real-time optimization into existing hierarchical control schemes. Efficiency enhancement in DC MGs and optimal unbalance compensation in AC MGs are taken as the optimization objectives in this project. Necessary system dynamic modeling and stability analysis......, a discrete-time domain modeling method is proposed to establish an accurate system level model. Taking into account the different sampling times of real world plant, digital controller and communication devices, the system is modeled with these three parts separately, and with full consideration...

  3. The ALICE Data Quality Monitoring: qualitative and quantitative review of three years of operations

    International Nuclear Information System (INIS)

    Haller, Barthélémy von; Telesca, Adriana; Bellini, Francesca; Foka, Yiota

    2014-01-01

    ALICE (A Large Ion Collider Experiment) is a detector designed to study the physics of strongly interacting matter produced in heavy-ion collisions at the CERN Large Hadron Collider (LHC). Due to the complexity of ALICE in terms of number of detectors and performance requirements, Data Quality Monitoring (DQM) plays an essential role in providing online feedback on the data being recorded. It intends to provide shifters with precise and complete information to quickly identify problems, and as a consequence to ensure acquisition of high quality data. This paper presents a review of the ALICE DQM system during the first three years of LHC operations from a quantitative and qualitative point of view. We start by presenting the DQM software and tools before moving on to the various analyses carried out. An overview of the produced monitoring quantities is given, presenting the diversity of usage and flexibility of the DQM. Well-prepared shifters and experts, in addition to a precise organisation, were required to ensure smooth and successful operations. The description of the measures taken to ensure both aspects and an account of the DQM shifters' job are followed by a summary of the evolution of the system. We then give a quantitative review of the final setup of the system used during the whole year 2012. We conclude the paper with use cases where the DQM proved to be very valuable, scalable and efficient and with the plans for the coming years.

  4. The fast Amsterdam multiprocessor (FAMP) operation system

    International Nuclear Information System (INIS)

    Gosman, D.; Hertzberger, L.O.; Holthuizen, D.J.; Por, G.J.A.; Schoorel, M.

    1981-01-01

    The Fast Amsterdam Multi Processor system (FAMP system) is developed for on-line filtering and second stage triggering. The system is based on the MC 68000 microprocessor from MOTOROLA. In this report we will describe: The FAMP operating system software, the features of the slaves and supervisor in the FAMP operating system, the communication between supervisor and slaves using the dual port memories, the communication between user programs and the operating system. The hardware as well as the application of the system will be described elsewhere. (orig.)

  5. 40 CFR 26.1603 - Operation of the Human Studies Review Board.

    Science.gov (United States)

    2010-07-01

    ... appropriate for the scientific and ethical review of human research, including research ethics, biostatistics... scientific and ethical aspects of research proposals and reports of completed research with human subjects... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Operation of the Human Studies Review...

  6. Real-time multi-task operators support system

    International Nuclear Information System (INIS)

    Wang He; Peng Minjun; Wang Hao; Cheng Shouyu

    2005-01-01

    The development in computer software and hardware technology and information processing as well as the accumulation in the design and feedback from Nuclear Power Plant (NPP) operation created a good opportunity to develop an integrated Operator Support System. The Real-time Multi-task Operator Support System (RMOSS) has been built to support the operator's decision making process during normal and abnormal operations. RMOSS consists of five system subtasks such as Data Collection and Validation Task (DCVT), Operation Monitoring Task (OMT), Fault Diagnostic Task (FDT), Operation Guideline Task (OGT) and Human Machine Interface Task (HMIT). RMOSS uses rule-based expert system and Artificial Neural Network (ANN). The rule-based expert system is used to identify the predefined events in static conditions and track the operation guideline through data processing. In dynamic status, Back-Propagation Neural Network is adopted for fault diagnosis, which is trained with the Genetic Algorithm. Embedded real-time operation system VxWorks and its integrated environment Tornado II are used as the RMOSS software cross-development. VxGUI is used to design HMI. All of the task programs are designed in C language. The task tests and function evaluation of RMOSS have been done in one real-time full scope simulator. Evaluation results show that each task of RMOSS is capable of accomplishing its functions. (authors)

  7. Computer-aided operations engineering with integrated models of systems and operations

    Science.gov (United States)

    Malin, Jane T.; Ryan, Dan; Fleming, Land

    1994-01-01

    CONFIG 3 is a prototype software tool that supports integrated conceptual design evaluation from early in the product life cycle, by supporting isolated or integrated modeling, simulation, and analysis of the function, structure, behavior, failures and operation of system designs. Integration and reuse of models is supported in an object-oriented environment providing capabilities for graph analysis and discrete event simulation. Integration is supported among diverse modeling approaches (component view, configuration or flow path view, and procedure view) and diverse simulation and analysis approaches. Support is provided for integrated engineering in diverse design domains, including mechanical and electro-mechanical systems, distributed computer systems, and chemical processing and transport systems. CONFIG supports abstracted qualitative and symbolic modeling, for early conceptual design. System models are component structure models with operating modes, with embedded time-related behavior models. CONFIG supports failure modeling and modeling of state or configuration changes that result in dynamic changes in dependencies among components. Operations and procedure models are activity structure models that interact with system models. CONFIG is designed to support evaluation of system operability, diagnosability and fault tolerance, and analysis of the development of system effects of problems over time, including faults, failures, and procedural or environmental difficulties.

  8. Design review report for the Hanford K East and K West Basins MCO loading system

    International Nuclear Information System (INIS)

    Brisbin, S.A.

    1997-01-01

    This design report presents the final design of the MCO Loading System. The report includes final design drawings, a system description, failure modes and recovery plans, a system operational description, and stress analysis. Design comments from the final design review have been incorporated

  9. The Advanced Technology Operations System: ATOS

    Science.gov (United States)

    Kaufeler, J.-F.; Laue, H. A.; Poulter, K.; Smith, H.

    1993-01-01

    Mission control systems supporting new space missions face ever-increasing requirements in terms of functionality, performance, reliability and efficiency. Modern data processing technology is providing the means to meet these requirements in new systems under development. During the past few years the European Space Operations Centre (ESOC) of the European Space Agency (ESA) has carried out a number of projects to demonstrate the feasibility of using advanced software technology, in particular, knowledge based systems, to support mission operations. A number of advances must be achieved before these techniques can be moved towards operational use in future missions, namely, integration of the applications into a single system framework and generalization of the applications so that they are mission independent. In order to achieve this goal, ESA initiated the Advanced Technology Operations System (ATOS) program, which will develop the infrastructure to support advanced software technology in mission operations, and provide applications modules to initially support: Mission Preparation, Mission Planning, Computer Assisted Operations, and Advanced Training. The first phase of the ATOS program is tasked with the goal of designing and prototyping the necessary system infrastructure to support the rest of the program. The major components of the ATOS architecture is presented. This architecture relies on the concept of a Mission Information Base (MIB) as the repository for all information and knowledge which will be used by the advanced application modules in future mission control systems. The MIB is being designed to exploit the latest in database and knowledge representation technology in an open and distributed system. In conclusion the technological and implementation challenges expected to be encountered, as well as the future plans and time scale of the project, are presented.

  10. Design of JRR-4 operation Supporting System

    International Nuclear Information System (INIS)

    Takahashi, Hiroki; Arai, Nobuyoshi; Yamamoto, Kazuyoshi; Yoritsune, Tsutomu

    1999-01-01

    A work on the Japan Research Reactor No. 4 (JRR-4) core modification from high-enriched fuels to low-enriched ones was started in 1996 and completed in May 1998. As a part of the work, Operation Supporting System (OSS) was adopted for the purpose of reducing load of operator, preventing operator's error and supplying operation data to users. As the result of adopting this system, integrated monitoring, automation of part of reactor operation and data management were realized. In addition, the cooling control system was compacted. (author)

  11. An introduction to testing techniques in the Intelsat TDMA/DSI system. II - Satellite system operations guide (SSOG) tests

    Science.gov (United States)

    Colby, R. J.; Parthasarathy, R.; Stimson, A. L.

    1983-12-01

    The test methods and procedures of the Intelsat TDMA/DSI SSOG are summarized. The overall structure of the SSOG is outlined, and the operational procedures to be followed for joining a new terminal to the system and for normal operations are reviewed, with an emphasis on the roles of the IOC and the TDMA reference and monitoring stations. The testing philosophy (based on minimal interruptions) and the star-test method are explained and illustrated with diagrams, and the test procedures are examined, including modem tests, electrical-path-length equalization, RF/IF downchain tests, protocol tests, nontransmitting protocol tests, IF/RF upchain tests, transmitting protocol tests, baseband tests, and orderwire lineups. The fundamental access discipline of the TDMA system is presented in an appendix.

  12. Remote operations and interactions for systems of arbitrary-dimensional Hilbert space: State-operator approach

    International Nuclear Information System (INIS)

    Reznik, Benni; Groisman, Berry; Aharonov, Yakir

    2002-01-01

    We present a systematic simple method for constructing deterministic remote operations on single and multiple systems of arbitrary discrete dimensionality. These operations include remote rotations, remote interactions, and measurements. The resources needed for an operation on a two-level system are one ebit and a bidirectional communication of two cbits, and for an n-level system, a pair of entangled n-level particles and two classical 'nits'. In the latter case, there are n-1 possible distinct operations per n-level entangled pair. Similar results apply for generating interaction between a pair of remote systems, while for remote measurements only one-directional classical communication is needed. We further consider remote operations on N spatially distributed systems, and show that the number of possible distinct operations increases here exponentially, with the available number of entangled pairs that are initially distributed between the systems. Our results follow from the properties of a hybrid state-operator object (stator), which describes quantum correlations between states and operations

  13. Safety management systems and their role in achieving high standards of operational safety

    International Nuclear Information System (INIS)

    Coulston, D.J.; Baylis, C.C.

    2000-01-01

    Achieving high standards of operational safety requires a robust management framework that is visible to all personnel with responsibility for its implementation. The structure of the management framework must ensure that all processes used to manage safety interlink in a logical and coherent manner, that is, they form a management system that leads to continuous improvement in safety performance. This Paper describes BNFL's safety management system (SMS). The SMS has management processes grouped within 5 main elements: 1. Policy, 2. Organisation, 3. Planning and Implementation, 4. Measuring and Reviewing Performance, 5. Audit. These elements reflect the overall process of setting safety objective (from Policy), measuring success and reviewing the performance. Effective implementation of the SMS requires senior managers to demonstrate leadership through their commitment and accountability. However, the SMS as a whole reflects that every employee at every level within BNFL is responsible for safety of operations under their control. The SMS therefore promotes a proactive safety culture and safe operations. The system is formally documented in the Company's Environmental, Health and Safety (EHS) Manual. Within in BNFL Group, the Company structures enables the Manual to provide overall SMS guidance and co-ordination to its range of nuclear businesses. Each business develops the SMS to be appropriate at all levels of its organisation, but ensuring that each level is consistent with the higher level. The Paper concludes with a summary of BNFL's safety performance. (author)

  14. General Logic-Systems and Consequence Operators

    OpenAIRE

    Herrmann, Robert A.

    2005-01-01

    In this paper, general logic-systems are investigated. It is shown that there are infinitely many finite consequence operators defined on a fixed language L that cannot be generated from a finite logic-system. It is shown that a set map is a finite consequence operator iff it is defined by a general logic-system.

  15. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  16. Operator-assisted planning and execution of proximity operations subject to operational constraints

    Science.gov (United States)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1991-01-01

    Future multi-vehicle operations will involve multiple scenarios that will require a planning tool for the rapid, interactive creation of fuel-efficient trajectories. The planning process must deal with higher-order, non-linear processes involving dynamics that are often counter-intuitive. The optimization of resulting trajectories can be difficult to envision. An interaction proximity operations planning system is being developed to provide the operator with easily interpreted visual feedback of trajectories and constraints. This system is hosted on an IRIS 4D graphics platform and utilizes the Clohessy-Wiltshire equations. An inverse dynamics algorithm is used to remove non-linearities while the trajectory maneuvers are decoupled and separated in a geometric spreadsheet. The operator has direct control of the position and time of trajectory waypoints to achieve the desired end conditions. Graphics provide the operator with visualization of satisfying operational constraints such as structural clearance, plume impingement, approach velocity limits, and arrival or departure corridors. Primer vector theory is combined with graphical presentation to improve operator understanding of suggested automated system solutions and to allow the operator to review, edit, or provide corrective action to the trajectory plan.

  17. Radioactive Operations Committee Review of the Intermediate-Level Waste Evaporator Facility, Building 2531 February 17, 1972

    International Nuclear Information System (INIS)

    Liberman, B.; Brooksbank, R.E.

    1972-01-01

    A subcommittee of the Radioactive Operations Committee met with the Operators of the Intermediate Level Waste Evaporator Facility on February 17, 1972, to discuss the status of the facility and its operations since the review of October 7, 1970, and reported in ORNL-CF-70-11-12. This review was made to determine the status of the ILWEF since the last review, to discuss compliance with previously recommended changes, and to review any new items of safety significance. Several recommendations were made.

  18. Osprey: Operating system for predictable clouds

    NARCIS (Netherlands)

    Sacha, Jan; Napper, Jeff; Mullender, Sape J.; McKie, Jim

    2012-01-01

    Cloud computing is currently based on hardware virtualization wherein a host operating system provides a virtual machine interface nearly identical to that of physical hardware to guest operating systems. Full transparency allows backward compatibility with legacy software but introduces

  19. Operator interface design considerations for a PACS information management system

    Science.gov (United States)

    Steinke, James E.; Nabijee, Kamal H.; Freeman, Rick H.; Prior, Fred W.

    1990-08-01

    As prototype PACS grow into fully digital departmental and hospital-wide systems, effective information storage and retrieval mechanisms become increasingly important. Thus far, designers of PACS workstations have concentrated on image communication and display functionality. The new challenge is to provide appropriate operator interface environments to facilitate information retrieval. The "Marburg Model" 1 provides a detailed analysis of the functions, control flows and data structures used in Radiology. It identifies a set of "actors" who perform information manipulation functions. Drawing on this model and its associated methodology it is possible to identify four modes of use of information systems in Radiology: Clinical Routine, Research, Consultation, and Administration. Each mode has its own specific access requirements and views of information. An operator interface strategy appropriate for each mode will be proposed. Clinical Routine mode is the principal concern of PACS primary diagnosis workstations. In a full PACS implementation, such workstations must provide a simple and consistent navigational aid for the on-line image database, a local work list of cases to be reviewed, and easy access to information from other hospital information systems. A hierarchical method of information access is preferred because it provides the ability to start at high-level entities and iteratively narrow the scope of information from which to select subsequent operations. An implementation using hierarchical, nested software windows which fulfills such requirements shall be examined.

  20. Reviewing operational experience feedback

    International Nuclear Information System (INIS)

    1991-04-01

    The purpose of this document is to provide detailed supplementary guidance to OSART experts to aid in the evaluation of operational experience feedback (OEF) programmes at nuclear power plants. The document begins by describing the objectives of an OEF programme. It goes on to indicate preparatory work and investigatory guidance for the expert. Section 5 describes attributes of an excellent OEF programme. Appended to these guidelines are examples of OEF documents from various plants. These are intended to help the expert by demonstrating the actual implementation of OEF in practice. These guidelines are in no way intended to conflict with existing national regulations and rules. A comprehensive OEF programme, as described in Section 2, would be impossible to evaluated in detail in the amount of time typically allocated for assessing OEF in an OSART review. The expert must use his or her time wisely by concentrating on those areas that appear to be the weakest

  1. External review systems for radiation oncology facilities - clinical audit versus other review systems

    International Nuclear Information System (INIS)

    Bogusz-Czerniewicz, M.

    2009-01-01

    Background: Between 1996 and 1999 project team of ExPeRT, catalogued four external review systems of health care facilities in the European Union and countries associated with EU. Aim: The aim of this paper is a/ to identify and compare currently existing external review systems for radiation oncology facilities and b/ to distinguish main differences between clinical audit and other external evaluation models and c/ to identify where those models are currently used in European Union member states. Materials and Methods: Based on the literature review and the survey conducted between January and April 2007 among representatives of 67 national societies (for diagnostic radiology, radiotherapy and nuclear medicine) in European Union member states, the analysis of existing external review systems in radiation oncology was performed. Relevant information about purpose, scope and methodology of evaluation process for those systems were surveyed. Results: The response to the questionnaire was 72%. Only a few countries did not supply any reply in spite of repeated enquiries to several recipients. Six main categories of systems aiming at measuring the quality of service management and delivery were identified: professional peer review -based schemes, hospital accreditation, accreditation in terms of ISO standards, award seeking, certification by International Standards Organization, and clinical audit. Conclusions: Though the methodology and terminology of the five main external review systems differ, a constant movement towards collaboration and convergence of those models has been observed. Due to the social, political, and economical aspects of each European country, the different audit systems have been implemented either on voluntary or mandatory basis. (author)

  2. Operating-System Support for Distributed Multimedia

    NARCIS (Netherlands)

    Mullender, Sape J.; Leslie, Ian M.; McAuley, Derek

    1994-01-01

    Multimedia applications place new demands upon processors, networks and operating systems. While some network designers, through ATM for example, have considered revolutionary approaches to supporting multimedia, the same cannot be said for operating systems designers. Most work is evolutionary in

  3. Nuclear Power Plant Operating Experience from the IAEA/NEA International Reporting System for Operating Experience, 2005-2008

    International Nuclear Information System (INIS)

    2010-06-01

    The fundamental objective of the Incident Reporting System (IRS) is to contribute to improving the safety of commercial nuclear power plants which are operated worldwide. This fourth publication, covering the period 2005-2008, follows on the success of the previous three. It highlights important lessons learned based on a review of the approximately 200 event reports received from the participating countries over this period. The book is written both for a non-technical audience and for senior officials in industry and government who have decision making roles in the nuclear power industry.

  4. From initial application to routine operation: Reviewing the Applications for Power Uprates

    International Nuclear Information System (INIS)

    Garis, Ninos; Skaanberg, Lars

    2007-01-01

    Current plans for power uprates in Swedish nuclear power plants will lead to significant increases in seven units and a lesser increase in one unit. To date SKI has received six applications, and two more are due in 2007. A power uprate process is initiated by the application to the Government by a licensee for approval to increase the thermal output of a reactor unit. This request is addressed to the Government and is forwarded to SKI for a preliminary safety review. The result of the review is then provided by SKI as a basis for a governmental decision. Six applications have been taken through the first stage of the process; of these, three have received governmental approval and three are currently awaiting a decision. If the licensee's application is approved by the Government, deeper analyses and studies are required in order to modify the plant and update the safety analysis report and the associated technical specifications. SKI reviews this material on a continuous basis prior to test and routine operation at the increased power level. There are four stages that require attention and review by SKI; 1. Review of the application to the Government for approval to operate at increased power levels, and preparation of a suitable answer. 2. Review and approval of the preliminary safety analysis report (PSAR) 3. Review and approval of the application for testing at the higher power level 4. Review and approval of routine operation at the higher power level. A thorough description of the handling of a power uprate process can be found in the SKI PM (SKI-PM 04:11) that is available on the SKI website (in Swedish)

  5. Advanced Autonomous Systems for Space Operations

    Science.gov (United States)

    Gross, A. R.; Smith, B. D.; Muscettola, N.; Barrett, A.; Mjolssness, E.; Clancy, D. J.

    2002-01-01

    New missions of exploration and space operations will require unprecedented levels of autonomy to successfully accomplish their objectives. Inherently high levels of complexity, cost, and communication distances will preclude the degree of human involvement common to current and previous space flight missions. With exponentially increasing capabilities of computer hardware and software, including networks and communication systems, a new balance of work is being developed between humans and machines. This new balance holds the promise of not only meeting the greatly increased space exploration requirements, but simultaneously dramatically reducing the design, development, test, and operating costs. New information technologies, which take advantage of knowledge-based software, model-based reasoning, and high performance computer systems, will enable the development of a new generation of design and development tools, schedulers, and vehicle and system health management capabilities. Such tools will provide a degree of machine intelligence and associated autonomy that has previously been unavailable. These capabilities are critical to the future of advanced space operations, since the science and operational requirements specified by such missions, as well as the budgetary constraints will limit the current practice of monitoring and controlling missions by a standing army of ground-based controllers. System autonomy capabilities have made great strides in recent years, for both ground and space flight applications. Autonomous systems have flown on advanced spacecraft, providing new levels of spacecraft capability and mission safety. Such on-board systems operate by utilizing model-based reasoning that provides the capability to work from high-level mission goals, while deriving the detailed system commands internally, rather than having to have such commands transmitted from Earth. This enables missions of such complexity and communication` distances as are not

  6. Multiple operating system rotation environment moving target defense

    Science.gov (United States)

    Evans, Nathaniel; Thompson, Michael

    2016-03-22

    Systems and methods for providing a multiple operating system rotation environment ("MORE") moving target defense ("MTD") computing system are described. The MORE-MTD system provides enhanced computer system security through a rotation of multiple operating systems. The MORE-MTD system increases attacker uncertainty, increases the cost of attacking the system, reduces the likelihood of an attacker locating a vulnerability, and reduces the exposure time of any located vulnerability. The MORE-MTD environment is effectuated by rotation of the operating systems at a given interval. The rotating operating systems create a consistently changing attack surface for remote attackers.

  7. Design review report: AN valve pit upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's AN Valve Pit Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314, Tank Farm Restoration and Safe Operations, is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farms' waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first package to be performed is the AN Valve Pit Upgrades package. The scope of the modifications includes new pit cover blocks, valve manifolds, leak detectors, transfer line connections (for future planned transfer lines), and special protective coating for the 241-AN-A and 241-AN-B valve pits

  8. Lessons Learned from Sandia National Laboratories' Operational Readiness Review of the Annular Core Research Reactor (ACRR)

    Energy Technology Data Exchange (ETDEWEB)

    Bendure, Albert O.; Bryson, James W.

    1999-05-17

    The Sandia ACRR (a Hazard Category 2 Nuclear Reactor Facility) was defueled in June 1997 to modify the reactor core and control system to produce medical radioisotopes for the Department of Energy (DOE) Isotope Production Program. The DOE determined that an Operational Readiness Review (ORR) was required to confirm readiness to begin operations within the revised safety basis. This paper addresses the ORR Process, lessons learned from the Sandia and DOE ORRS of the ACRR, and the use of the ORR to confirm authorization basis implementation.

  9. NRC Information No. 88-86: Operating with multiple grounds in direct current distribution systems

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1992-01-01

    During recent NRC maintenance inspections at Quad Cities, Oconee, and D.C. Cook power reactor facilities, it was found that plants had been operating with multiple grounds in the dc distribution systems for extended periods. Specific examples are described. Most nuclear power plant dc systems are two-wire ungrounded, combination battery/charger systems equipped with ground detection. Typical ground detection system features include a remote annunciator and a local indicator and/or recorder. Ground detectors are incorporated in the dc system so that if a single ground point does occur, immediate steps can be taken to clear the ground fault from the system. Failure to respond to a single ground will mask subsequent grounds. Multiple grounds can cause the indiscriminate operation of equipment, which may have safety consequences. Grounds can cause control circuit fuses to fail and can render important safety equipment inoperable as previously described. Furthermore, batteries have a designed capacity to supply power during a station blackout condition, and this capacity can be affected by the presence of unanalyzed loads in the form of multiple grounds. It is recognized that troubleshooting and finding grounds on a dc system are difficult tasks that may affect plant operation. The licensees previously mentioned have reviewed their designs and conditions for potential impact on safety system operability and have taken corrective actions to minimize the effect of grounds

  10. Neurosurgical operating computerized tomographic scanner system. The CT scanner in the operating theater

    Energy Technology Data Exchange (ETDEWEB)

    Okudera, Hiroshi; Sugita, Kenichiro; Kobayashi, Shigeaki; Kimishima, Sakae; Yoshida, Hisashi

    1988-12-01

    A neurosurgical operating computerized tomography scanner system is presented. This system has been developed for obtaining intra- and postoperative CT images in the operating room. A TCT-300 scanner (manufactured by the Toshiba Co., Tokyo) is placed in the operating room. The realization of a true intraoperative CT image requires certain improvements in the CT scanner and operating table. To adjust the axis of the co-ordinates of the motor system of the MST-7000 microsurgical operating table (manufactured by the Mizuho Ika Co., Tokyo) to the CT scanner, we have designed an interface and a precise motor system so that the computer of the CT scanner can directly control the movement of the operating table. Furthermore, a new head-fixation system has been designed for producing artifact-free intraoperative CT images. The head-pins of the head-fixation system are made of carbon-fiber bars and titanium tips. A simulation study of the total system in the operating room with the CT scanner, operating table, and head holder using a skull model yielded a degree of error similar to that in the phantom testing of the original scanner. Three patients underwent resection of a glial tumor using this system. Intraoperative CT scans taken after dural opening showed a bulging of the cortex, a shift in the central structure, and a displacement of the cortical subarachnoid spaces under the influence of gravity. With a contrast medium the edge of the surrounding brain after resection was enhanced and the residual tumor mass was demonstrated clearly. This system makes it possible to obtain a noninvasive intraoperative image in a situation where structural shifts are taking place.

  11. Systems Science and Childhood Obesity: A Systematic Review and New Directions

    OpenAIRE

    Skinner, Asheley Cockrell; Foster, E. Michael

    2013-01-01

    As a public health problem, childhood obesity operates at multiple levels, ranging from individual health behaviors to school and community characteristics to public policies. Examining obesity, particularly childhood obesity, from any single perspective is likely to fail, and systems science methods offer a possible solution. We systematically reviewed studies that examined the causes and/or consequences of obesity from a systems science perspective. The 21 included studies addressed four ge...

  12. A Practical Review of Studies on Operator's Supervisory Monitoring Behavior

    International Nuclear Information System (INIS)

    Ha, Jun Su; Seong, Poong Hyun

    2009-01-01

    Correct situation awareness (SA) has been considered a crucial key to improving performance and reducing error in NPPs. There are a lot of information sources that should be monitored in NPPs, but operators have only limited capacity of attention and memory. Operators in NPPs selectively attend to important information sources to effectively develop SA when an abnormal or accidental situation occurs. Selective attention to important information sources is continued while maintaining SA as well. In this work, various models of operator's visual sampling behavior are reviewed for the use in human factors studies in NPPs

  13. Numerical modelling of multi-vane expander operating conditions in ORC system

    Science.gov (United States)

    Rak, Józef; Błasiak, Przemysław; Kolasiński, Piotr

    2017-11-01

    Multi-vane expanders are positive displacement volumetric machines which are nowadays considered for application in micro-power domestic ORC systems as promising alternative to micro turbines and other volumetric expanders. The multi-vane expander features very simple design, low gas flow capacity, low expansion ratios, an advantageous ratio of the power output to the external dimensions and are insensitive to the negative influence of the gas-liquid mixture expansion. Moreover, the multi-vane expander can be easily hermetically sealed, which is one of the key issues in the ORC system design. A literature review indicates that issues concerning the application of multi-vane expanders in such systems, especially related to operating of multi-vane expander with different low-boiling working fluids, are innovative, not fully scientifically described and have the potential for practical implementation. In this paper the results of numerical investigations on multi-vane expander operating conditions are presented. The analyses were performed on three-dimensional numerical model of the expander in ANSYS CFX software. The numerical model of the expander was validated using the data obtained from the experiment carried out on a lab test-stand. Then a series of computational analysis were performed using expanders' numerical model in order to determine its operating conditions under various flow conditions of different working fluids.

  14. Database/Operating System Co-Design

    OpenAIRE

    Giceva, Jana

    2016-01-01

    We want to investigate how to improve the information flow between a database and an operating system, aiming for better scheduling and smarter resource management. We are interested in identifying the potential optimizations that can be achieved with a better interaction between a database engine and the underlying operating system, especially by allowing the application to get more control over scheduling and memory management decisions. Therefore, we explored some of the issues that arise ...

  15. Assessing Operational Situations

    DEFF Research Database (Denmark)

    Zhang, Xinxin

    In spite of the high level of automation commonly applied to today’s engineering system, humans’ skill and knowledge still plays a central role in the systems’ daily operation, critical decision making, and accident management. The complexity of the engineered system poses great challenge for human...... operators to perceive and understand the operational situation. The research domain of situation awareness approaches the operational challenges from the human cognition perspective while the presented thesis aims at supporting situation assessment from the system perspective. The thesis has reviewed...... different perspectives on situation awareness in the human factor studies and uses the knowledge reflectively for system representation and analysis. The human cognitive activities during complex plant operation and how they perceive a situation and what kind of knowledge has to be established in the human...

  16. Mortuary operations following mass fatality natural disasters: a review.

    Science.gov (United States)

    Anderson, Madelyn; Leditschke, Jodie; Bassed, Richard; Cordner, Stephen M; Drummer, Olaf H

    2017-03-01

    This is a critical review to discuss the best practice approaches to mortuary operations in preparation for and the response to natural, mass fatality, disaster events, as identified by a review of published articles. The Preferred Reporting Items for Systematic Reviews and Meta-Analysis Protocols (PRISMA-P) Statement guided the identification of potential articles to use in this critical review. Subsequent searches were also conducted to identify articles relating to heat wave, and flood mortality. All identified peer-reviewed studies published in English which discussed the preparation and response of mortuaries to mass fatality natural disasters occurring in developed countries were included. Using the PRISMA-P method of identifying articles, 18 articles were selected for inclusion in this review. Although there are numerous articles which describe the mortuary response to mass fatality incidents, few articles analyzed the response, or discussed the roles which supported and enabled the organization to undertake the task of identifying disaster victims. It is thus difficult to determine objectively if the actions and activities outlined in the articles represent best-practice.

  17. Control and Operation of Islanded Distribution System

    DEFF Research Database (Denmark)

    Mahat, Pukar

    deviation and real power shift. When a distribution system, with all its generators operating at maximum power, is islanded, the frequency will go down if the total load is more than the total generation. An under-frequency load shedding procedure for islanded distribution systems with DG unit(s) based...... states. Short circuit power also changes when some of the generators in the distribution system are disconnected. This may result in elongation of fault clearing time and hence disconnection of equipments (including generators) in the distribution system or unnecessary operation of protective devices...... operational challenges. But, on the other hand, it has also opened up some opportunities. One opportunity/challenge is an islanded operation of a distribution system with DG unit(s). Islanding is a situation in which a distribution system becomes electrically isolated from the remainder of the power system...

  18. Operating experience and systems analysis at Trillo NPP: A program intended for systematic review of plant safety systems to assess design basis requirements compliance

    International Nuclear Information System (INIS)

    Vega, R. de la

    1996-01-01

    The program was defined to apply to all plant safety systems and/or systems included in plant Technical Specifications. The goal of the program was to ensure, by systematic design, construction, and commissioning review, the adequacy of safety systems, structures and components to fulfill their safety functions. Also, as a result of the program, it was established that a complete, unambiguous, systematic, design basis definition shall take place. And finally, a complete documental review of the plant design shall result from the program execution

  19. Recommendations for secure initialization routines in operating systems

    OpenAIRE

    Dodge, Catherine A.

    2004-01-01

    Approved for public release; distribution in unlimited. While a necessity of all operating systems, the code that initializes a system can be notoriously difficult to understand. This thesis explores the most common architectures used for bringing an operating system to its initial state, once the operating system gains control from the boot loader. Specifically, the ways in which the OpenBSD and Linux operating systems handle initialization are dissected. With this understanding, a set ...

  20. Operational Characteristics of an Accelerator Driven Fissile Solution System

    International Nuclear Information System (INIS)

    Kimpland, Robert Herbert

    2016-01-01

    Operational characteristics represent the set of responses that a nuclear system exhibits during normal operation. Operators rely on this behavior to assess the status of the system and to predict the consequences of off-normal events. These characteristics largely refer to the relationship between power and system operating conditions. The static and dynamic behavior of a chain-reacting system, operating at sufficient power, is primarily governed by reactivity effects. The science of reactor physics has identified and evaluated a number of such effects, including Doppler broadening and shifts in the thermal neutron spectrum. Often these reactivity effects are quantified in the form of feedback coefficients that serve as coupling coefficients relating the neutron population and the physical mechanisms that drive reactivity effects, such as fissile material temperature and density changes. The operational characteristics of such nuclear systems usually manifest themselves when perturbations between system power (neutron population) and system operating conditions arise. Successful operation of such systems requires the establishment of steady equilibrium conditions. However, prior to obtaining the desired equilibrium (steady-state) conditions, an approach from zero-power (startup) must occur. This operational regime may possess certain limiting system conditions that must be maintained to achieve effective startup. Once steady-state is achieved, a key characteristic of this operational regime is the level of stability that the system possesses. Finally, a third operational regime, shutdown, may also possess limiting conditions of operation that must be maintained. This report documents the operational characteristics of a ''generic'' Accelerator Driven Fissile Solution (ADFS) system during the various operational regimes of startup, steady-state operation, and shutdown. Typical time-dependent behavior for each operational regime will be illustrated, and key system

  1. Self-contained microfluidic systems: a review.

    Science.gov (United States)

    Boyd-Moss, Mitchell; Baratchi, Sara; Di Venere, Martina; Khoshmanesh, Khashayar

    2016-08-16

    Microfluidic systems enable rapid diagnosis, screening and monitoring of diseases and health conditions using small amounts of biological samples and reagents. Despite these remarkable features, conventional microfluidic systems rely on bulky expensive external equipment, which hinders their utility as powerful analysis tools outside of research laboratories. 'Self-contained' microfluidic systems, which contain all necessary components to facilitate a complete assay, have been developed to address this limitation. In this review, we provide an in-depth overview of self-contained microfluidic systems. We categorise these systems based on their operating mechanisms into three major groups: passive, hand-powered and active. Several examples are provided to discuss the structure, capabilities and shortcomings of each group. In particular, we discuss the self-contained microfluidic systems enabled by active mechanisms, due to their unique capability for running multi-step and highly controllable diagnostic assays. Integration of self-contained microfluidic systems with the image acquisition and processing capabilities of smartphones, especially those equipped with accessory optical components, enables highly sensitive and quantitative assays, which are discussed. Finally, the future trends and possible solutions to expand the versatility of self-contained, stand-alone microfluidic platforms are outlined.

  2. Monitoring and operation system for severe accidents

    International Nuclear Information System (INIS)

    Fukui, Toshiki; Niida, Shinji; Kato, Yumeto

    2017-01-01

    Monitoring and operation system for Severe Accidents (SA-MOS) is a compact Instrumentation and Control (I and C) system developed by Mitsubishi Heavy Industries (MHI) and certificated by the Japanese Nuclear Regulatory Agency (NRA) as a design application for Japanese existing PWR nuclear power plants. The system is tailored to provide monitoring and operation for Severe Accident (SA) conditions, and consists of digitalized I and C System, Human Systems Interface (HSI) system and Power Supply (PS) system as further improvement of reliability and safety. This design plans to be applied to the next Japanese PWR plants. In accordance with the new regulatory standards that NRA has established corresponding to the Fukushima accident, a long-term Station Black Out (SBO) scenario and 24-hours power supply by the storage battery in case of SA has been required. In order to address 24-hours power supply requirement in SA condition, the storage battery volume shall be increased. However, it may be difficult to introduce additional batteries to the existing plant site because of room space constraints, etc. Therefore, power distributions for the facilities which are only used for Design Basis Accident (DBA), are shut down in order to secure 24-hours operations of facilities for SA conditions including SA-MOS. That enables efficient battery resource operations as well as optimizes room space factors shared by battery cabinets. Another benefit is to introduce dedicate HSI system for SA condition and operators shift their operations using that dedicated HSI system to cope with SA events. That can reduce operator workload which forces operators to verify or choose which controllers and indicators are available in SA conditions. Furthermore, application of SA-MOS, secures the independence of the layers (DBA⇔SA) as well as secures the plant data transfer for SA conditions outside of plant. Those plant data assets can be shared by plant operation supporting personnel and

  3. Operator aid system for Dhruva fueling machine

    International Nuclear Information System (INIS)

    Misra, S.M.; Ramaswamy, L.R.; Gohel, N.; Bharadwaj, G.; Ranade, M.R.; Khadilkar, M.G.

    1997-01-01

    Systems with significant software contents are replacing the old hardware logic systems. These systems not only are versatile but are easy to make changes in the program. Extensive use of such systems in critical real-time operation environment warrants not only excessive training on simulators, documentation but also fault tolerant system to bring the operation to a safe state in case of error. With new graphic user software interface and advancement in personal computer hardware design, the dynamic status of the physical environment can be shown on the visual display at near real time. These visual aids along with the software covering all the interlocks aids an operator in his professional work. This paper highlights the operator aid system for Dhruva fueling machine. (author). 6 refs., 1 fig

  4. Usability evaluation of complex systems. A literature review

    International Nuclear Information System (INIS)

    Norros, L.; Savioja, P.

    2004-04-01

    In this literature study the task of usability evaluation is approached through recent publications and known practises. The scope of the reviewed literature and the overall problematic of evaluating complex systems are first defined. Then existing evaluation methods and tools and a set of design guidelines and standards is introduced. In there view the distinction between the evaluation of the design process and evaluation of the outcome of the design process is made. Also the existing criteria for usability is provided. These criteria can be used as measures in the evaluation procedures described in the previous chapter. Then, the problem of validity in the evaluation and validation procedures of complex cognitive systems is shortly discusses. The final chapter covers the conclusions of the literature review. There is a need for deepening the relationship between usage and design. Usage must be the driver also in the design of process technology, plant's safety, and instrumentation and control as well as that of the design of man-machine interface. The collaborative activity is called activity-oriented design. In order to enable activity-oriented design we need to create design methods that drive the design activity into this direction. Criteria for evaluating what is good design are not available in present standards. Criteria for good tools and practices must consider human in a favourable role in the various tasks of operating an industrial plant as opposed to the view of human as a source of error. This is the way to create an optimal system, which takes advantage of the unique capabilities of both the human operators and the automation systems. (orig.)

  5. Development of Information System for Patients with Cleft Lip and Palate undergoing Operation.

    Science.gov (United States)

    Augsornwan, Darawan; Pattangtanang, Pantamanas; Surakunprapha, Palakorn

    2015-08-01

    Srinagarind Hospital has 150-200 patients with cleft lip and palate each year. When patients are admitted to hospital for surgery patients and family feel they are in a crisis of life, they feel fear anxiety and need to know about how to take care of wound, they worry if patient will feel pain, how to feed patients and many things about patients. Information is very important for patients/family to prevent complications and help their decision process, decrease parents stress and encourage better co-operation. To develop information system for patients with cleft lip-palate undergoing operation. This is an action research divided into 3 phases. Phase 1 Situation review: in this phase we interview, nursing care observation, and review nursing documents about the information giving. Phase 2 Develop information system: focus groups, for discussion about what nurses can do to develop the system to give information to patients/parents. Phase 3 evaluation: by interviewing 61 parents using the structure questionnaire. 100 percent of patients/parents received information but some items were not received. Patients/parents satisfaction was 94.9 percent, no complications. The information system development provides optimal care for patients and family with cleft lip and palate, but needs to improve some techniques or tools to give more information and evaluate further the nursing outcome after.

  6. Use of a valve operation test and evaluation system to enhance valve reliability

    International Nuclear Information System (INIS)

    Lowry, D.A.

    1990-01-01

    Power plant owners have emphasized the need for assuring safe, reliable operation of valves. While most valves must simply open or close, the mechanisms involved can be quite complex. Motor operated valves (MOVs) must be properly adjusted to assure operability. Individual operator components determine the performance of the entire MOV. Failure in MOVs could cripple or shut down a unit. Thus, a complete valve program consisting of design reviews, operational testing, and preventive and predictive maintenance activities will enhance an owner's confidence level that his valves win operate as expected. Liberty's Valve Operation Test and Evaluation System (VOTES) accurately measures stein thrust without intruding on valve operation. Since mounting a strain gage to a valve stem is a desirable but impractical way of obtaining precise stem thrust, Liberty developed a method to obtain identical data by placing a strain gage sensor on the valve yoke. VOTES provides information which effectively eliminates costly, unscheduled downtime. This paper presents the results of infield VOTES testing. The system's proven ability to identify and characterize actuator and valve performance is demonstrated. Specific topics of discussion include the ability of VOTES to ease a utility's IE Bulletin 8543 concerns and conclusively diagnose MOV components. Data from static and differential pressure testing are presented. Technical, operational, and financial advantages resulting from VOTES technology are explored in detail

  7. Algebra & trigonometry super review

    CERN Document Server

    2012-01-01

    Get all you need to know with Super Reviews! Each Super Review is packed with in-depth, student-friendly topic reviews that fully explain everything about the subject. The Algebra and Trigonometry Super Review includes sets and set operations, number systems and fundamental algebraic laws and operations, exponents and radicals, polynomials and rational expressions, equations, linear equations and systems of linear equations, inequalities, relations and functions, quadratic equations, equations of higher order, ratios, proportions, and variations. Take the Super Review quizzes to see how much y

  8. Operator support systems activities at EPRI

    International Nuclear Information System (INIS)

    Naser, J.A.

    1993-01-01

    The integration of operator support systems supports the nuclear power plant goals of improved availability and reliability, enhanced safety, reduced operations and maintenance costs, and improved productivity. Two major aspects which supports this integration are discussed in this paper. The first is the plant communications and computing architecture which provides the infrastructure that allows the integration to exist in a easy to implement manner. Open systems concepts are utilized to guarantee interoperability of systems and interchangeability of equipment. The second is the EPRI Plant-Window System which supplies the interface between the human and the plant systems. It implements common human-machine interfaces amongst systems and supports the implementation of diagnostic and decision aids. Work in both of these areas is being done as part of the EPRI Instrumentation and Control Upgrade Program. A number of operator support systems have been developed and are in various stages of implementation, testing and utilization. Two of these, the RWCU and the EOPTS, are described here. 5 refs, 14 figs

  9. Engineering Review Information System

    Science.gov (United States)

    Grems, III, Edward G. (Inventor); Henze, James E. (Inventor); Bixby, Jonathan A. (Inventor); Roberts, Mark (Inventor); Mann, Thomas (Inventor)

    2015-01-01

    A disciplinal engineering review computer information system and method by defining a database of disciplinal engineering review process entities for an enterprise engineering program, opening a computer supported engineering item based upon the defined disciplinal engineering review process entities, managing a review of the opened engineering item according to the defined disciplinal engineering review process entities, and closing the opened engineering item according to the opened engineering item review.

  10. Receiver Operating Characteristics (ROCs) in Recognition Memory: A Review

    Science.gov (United States)

    Yonelinas, Andrew P.; Parks, Colleen M.

    2007-01-01

    Receiver operating characteristic (ROC) analysis is being used increasingly to examine the memory processes underlying recognition memory. The authors discuss the methodological issues involved in conducting and analyzing ROC results, describe the various models that have been developed to account for these results, review the behavioral empirical…

  11. Building reactor operator sustain expert system with C language integrated production system

    International Nuclear Information System (INIS)

    Ouyang Qin; Hu Shouyin; Wang Ruipian

    2002-01-01

    The development of the reactor operator sustain expert system is introduced, the capability of building reactor operator sustain expert system is discussed with C Language Integrated Production System (Clips), and a simple antitype of expert system is illustrated. The limitation of building reactor operator sustain expert system with Clips is also discussed

  12. From Operating-System Correctness to Pervasively Verified Applications

    Science.gov (United States)

    Daum, Matthias; Schirmer, Norbert W.; Schmidt, Mareike

    Though program verification is known and has been used for decades, the verification of a complete computer system still remains a grand challenge. Part of this challenge is the interaction of application programs with the operating system, which is usually entrusted with retrieving input data from and transferring output data to peripheral devices. In this scenario, the correct operation of the applications inherently relies on operating-system correctness. Based on the formal correctness of our real-time operating system Olos, this paper describes an approach to pervasively verify applications running on top of the operating system.

  13. Air operations language for military space ground systems

    Science.gov (United States)

    Davis, P.

    The trends in military space ground system architecture is toward large amounts of software and more widely distributed processors. At the same time, life cycle cost considerations dictate that fewer personnel with minimized skill levels and knowledge operate and support these systems. This squeeze necessitates more human engineering and operational planning into the design of these systems. Several techniques have been developed to satisfy these requirements. An operations language is one of these techniques. It involves a specially defined syntax for control of the system. Individual directives are able to be grouped into operations language procedures. These procedures can be prepared offline ahead of time by more skilled personnel and then used to ensure repeatability of operational sequences and reduce operator errors. The use of an operations language also provides benefits for the handling of contingency operations as well as in the system testing and validation programs.

  14. The design and implementation of device operation and management system based on LAMP

    International Nuclear Information System (INIS)

    Liu Shuzhen; Ma Lanxin; Qi Fazhi

    2010-01-01

    In order to manage devices with high efficiency and high quality and make it more standardized, more scientific and more modern, we use the platform of LAMP (Linux-Apache-Mysql-PHP) to develop a web-based equipment operation and management system. It uses the Browser/Server mode as the system mode and Mysql as the database to complete the function, such as query, modify, add, delete, batch import, batch export user information and device information, automatic alarm, user reviews and so on. (authors)

  15. The assisting system for uranium enrichment plant operation

    International Nuclear Information System (INIS)

    Nakazawa, Hiroaki; Yamamoto, Fumio

    1990-01-01

    We have been developing an operation assisting system, partially supported by AI system, for uranium enrichment plant. The AI system is a proto-type system aiming a final one which can be applied to any future large uranium enrichment plant and also not only to specific operational area but also to complex and multi-phenomenon operational area. An existing AI system, for example facility diagnostic system that utilizes the result of CCT analysis as knowledge base, has weakness in flexibility and potentiality. To build AI system, we have developed the most suitable knowledge representations using deep knowledge for each facility or operation of uranium enrichment plant. This paper describes our AI proto-type system adopting several knowledge representations that can represent an uranium enrichment plant's operation with deep knowledge. (author)

  16. Non-operative treatment of spontaneous spinal epidural hematomas: a review of the literature and a comparison with operative cases : a review of the literature and a comparison with operative cases

    NARCIS (Netherlands)

    Groen, R J M

    OBJECTIVE: To identify factors that favour spontaneous recovery in patients who suffered a spontaneous spinal epidural hematoma (SSEH). METHODS: The literature was reviewed regarding non-operative cases of SSEH (SSEH(cons)). Sixty-two cases from the literature and 2 of our own cases were collected,

  17. An Intelligent Multiagent System for Autonomous Microgrid Operation

    Directory of Open Access Journals (Sweden)

    Tetsuo Kinoshita

    2012-09-01

    Full Text Available A microgrid is an eco-friendly power system because renewable sources such as solar and wind power are used as the main power sources. For this reason, much research, development, and demonstration projects have recently taken place in many countries. Operation is one of the important research topics for microgrids. For efficient and economical microgrid operation, a human operator is required as in other power systems, but it is difficult because there are some restrictions related to operation costs and privacy issues. To overcome the restriction, autonomous operation for microgrids is required. Recently, an intelligent agent system for autonomous microgrid operation has been studied as a potential solution. This paper proposes a multiagent system for autonomous microgrid operation. To build the multiagent system, the functionalities of agents, interactions among agents, and an effective agent protocol have been designed. The proposed system has been implemented by using an ADIPS/DASH framework as an agent platform. The intelligent multiagent system for microgrid operation based on the proposed scheme is tested to show the functionality and feasibility on a distributed environment through the Internet.

  18. AN EVALUATION OF PHOTOVOLTAIC SYSTEMS MPPT TECHNIQUES UNDER THE CHARACTERISTICS OF OPERATIONAL CONDITIONS

    Directory of Open Access Journals (Sweden)

    I. A. Elzein

    2017-01-01

    Full Text Available In this article an extended literature surveying review is launched on a set of comparative studies of maximum power point tracking (MPPT techniques. Different MPPT methods are addressed with an ultimate aim of how to be maximizing the PV system output power by tracking Pmax in a set of different operational circumstances. In this paper maximum power point tracking, MPPT techniques are reviewed on basis of different parameters related to the design simplicity and/or complexity, implementation, hardware required, and other related aspects.he technology of solar systems has been booming for a while due to its ability to replace current fossil fuels like coal and gas for generation of electricity that produce air, water, and land pollution. In addition it decreased the issue of global warming and climate changes substantially due to being produced in a clean environmental manner and was proved to be an Eco-friendly resource of energy. The photovoltaic systems’ manufacturing process has been improving continuously over the last decade and photovoltaic systems have become an interesting solution. Precisely, PV systems are constituted from arrays of photovoltaic cells, choppers (mainly buck-boost or boost DC/DC converter, MPPT control systems and storage devices and/or grid connections. To improve the efficiency of such systems, various studies have been performed. The demand of PV generation systems seems to be increased for both standalone and grid-connected modes of PV systems. Therefore, an efficient maximum power point tracking (MPPT technique is necessary to initialize the process of tracking the maximum power point MPP at all environmental conditions and then force the PV system to operate at that MPP point.

  19. Operator decision support system for sodium loop

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Hyeang; Park, Kyu Ho; Kim, Tak Kon; Jo, Choong Ho; Seong, Kyeong A; Lee, Keon Myeong; Kim, Yeong Dal; Kim, Chang Beom; Kim, Jong Kyu; Jo, Hee Chang; Lee, Ji Hyeong; Jeong, Yoon Soo; Chio, Jong Hyeong; Jeong, Bong Joon; Hong, Joon Seong; Kim, Bong Wan; Seong, Byeong Hak [Korea Advanced Institute Science and Technology, Taejon (Korea, Republic of)

    1994-07-01

    The objective of this study is to develop an operator decision support system by computerizing the sodium circuit. This study developed graphical display interface for the control panel which provides the safety control of equipment, the recognition of experimental process states and sodium circuit states. In this study, basic work to develop an operator decision support real-time expert system for sodium loop was carried out. Simplification of control commands and effective operation of various real-time data and signals by equipment code standardization are studied. The cost ineffectiveness of the single processor structure provides the ground for the development of cost effective parallel processing system. The important tasks of this study are (1) design and implementation of control state surveillance panel of sodium loop, (2) requirement analysis of operator support real-time expert system for sodium loop, (3) design of standard code rule for operating equipment and research on the cost effective all purpose parallel processing system and (4) requirement analysis of expert system and design of control state variables and user interface for experimental process. 10 refs., 36 figs., 20 tabs.

  20. Supervision functions - Secure operation of sustainable power systems

    DEFF Research Database (Denmark)

    Morais, Hugo; Zhang, Xinxin; Lind, Morten

    2013-01-01

    of power systems operation control. The use of PMUs allows more penetration of DG mainly, with technologies based on renewable resources with intermittent and unpredictable operation such a wind power. This paper introduces the Secure Operation of Sustainable Power Systems (SOSPO) project. The SOSPO...... project tries to respond to the question "How to ensure a secure operation of the future power system where the operating point is heavily is fluctuating?" focusing in the Supervision module architecture and in the power system operation states. The main goal of Supervision module is to determine...... the power system operation state based on new stability and security parameters derived from PMUs measurement and coordinate the use of automatic and manual control actions. The coordination of the control action is based not only in the static indicators but also in the performance evaluation of control...

  1. Towards Designing Graceful Degradation into Trajectory Based Operations: A Human-systems Integration Approach

    Science.gov (United States)

    Edwards, Tamsyn; Lee, Paul

    2017-01-01

    One of the most fundamental changes to the air traffic management system in NextGen is the concept of trajectory based operations (TBO). With the introduction of such change, system safety and resilience is a critical concern, in particular, the ability of systems to gracefully degrade. In order to design graceful degradation into a TBO envrionment, knowledge of the potential causes of degradation, and appropriate solutions, is required. In addition, previous research has predominantly explored the technological contribution to graceful degradation, frequently neglecting to consider the role of the human operator, specifically, air traffic controllers (ATCOs). This is out of step with real-world operations, and potentially limits an ecologically valid understanding of achieving graceful degradation in an air traffic control (ATC) environment. The following literature review aims to identify and summarize the literature to date on the potential causes of degradation in ATC and the solutions that may be applied within a TBO context, with a specific focus on the contribution of the air traffic controller. A framework of graceful degradation, developed from the literature, is presented. It is argued that in order to achieve graceful degradation within TBO, a human-system integration approach must be applied.

  2. Simulating Sustainment for an Unmanned Logistics System Concept of Operation in Support of Distributed Operations

    Science.gov (United States)

    2017-06-01

    SYSTEM CONCEPT OF OPERATION IN SUPPORT OF DISTRIBUTED OPERATIONS by Elle M. Ekman June 2017 Thesis...UNMANNED LOGISTICS SYSTEM CONCEPT OF OPERATION IN SUPPORT OF DISTRIBUTED OPERATIONS Elle M. Ekman Captain, United States Marine Corps B.S...Corps CO company CONEPS concept of employment CONOPS concept of operations CP command post CUAS cargo unmanned aircraft system DES discrete

  3. Reducing an attack surface of an operating system

    OpenAIRE

    VALKONEN, VILLE

    2012-01-01

    Certain security choices done on the operating system level can mitigate harm done by an malicious attacker or a program. The main focus in the thesis is on open source operating systems. Asiasanat: software security, operating system security

  4. Assessment of resident operative performance using a real-time mobile Web system: preparing for the milestone age.

    Science.gov (United States)

    Wagner, Justin P; Chen, David C; Donahue, Timothy R; Quach, Chi; Hines, O Joe; Hiatt, Jonathan R; Tillou, Areti

    2014-01-01

    To satisfy trainees' operative competency requirements while improving feedback validity and timeliness using a mobile Web-based platform. The Southern Illinois University Operative Performance Rating Scale (OPRS) was embedded into a website formatted for mobile devices. From March 2013 to February 2014, faculty members were instructed to complete the OPRS form while providing verbal feedback to the operating resident at the conclusion of each procedure. Submitted data were compiled automatically within a secure Web-based spreadsheet. Conventional end-of-rotation performance (CERP) evaluations filed 2006 to 2013 and OPRS performance scores were compared by year of training using serial and independent-samples t tests. The mean CERP scores and OPRS overall resident operative performance scores were directly compared using a linear regression model. OPRS mobile site analytics were reviewed using a Web-based reporting program. Large university-based general surgery residency program. General Surgery faculty used the mobile Web OPRS system to rate resident performance. Residents and the program director reviewed evaluations semiannually. Over the study period, 18 faculty members and 37 residents logged 176 operations using the mobile OPRS system. There were 334 total OPRS website visits. Median time to complete an evaluation was 45 minutes from the end of the operation, and faculty spent an average of 134 seconds on the site to enter 1 assessment. In the 38,506 CERP evaluations reviewed, mean performance scores showed a positive linear trend of 2% change per year of training (p = 0.001). OPRS overall resident operative performance scores showed a significant linear (p = 0.001), quadratic (p = 0.001), and cubic (p = 0.003) trend of change per year of clinical training, reflecting the resident operative experience in our training program. Differences between postgraduate year-1 and postgraduate year-5 overall performance scores were greater with the OPRS (mean = 0.96, CI

  5. Supervisory Control and Diagnostics System Distributed Operating System

    International Nuclear Information System (INIS)

    McGoldrick, P.R.

    1979-01-01

    This paper contains a description of the Supervisory Control and Diagnostics System (SCDS) Distributed Operating System. The SCDS consists of nine 32-bit minicomputers with shared memory. The system's main purpose is to control a large Mirror Fusion Test Facility

  6. Operator Support System for Pressurized Water Reactor

    International Nuclear Information System (INIS)

    Wei Renjie; Shen Shifei

    1996-01-01

    Operator Support System for Pressurized Water Reactor (OSSPWR) has been developed under the sponsorship of IAEA from August 1994. The project is being carried out by the Department of Engineering Physics, Tsinghua University, Beijing, China. The Design concepts of the operator support functions have been established. The prototype systems of OSSPWR has been developed as well. The primary goal of the project is to create an advanced operator support system by applying new technologies such as artificial intelligence (AI) techniques, advanced communication technologies, etc. Recently, the advanced man-machine interface for nuclear power plant operators has been developed. It is connected to the modern computer systems and utilizes new high performance graphic displays. (author). 6 refs, 4 figs

  7. Review of operational experience with the gas-cooled Magnox reactors of the United Kingdom Central Electricity Generating Board

    International Nuclear Information System (INIS)

    Cave, L.; Clarke, A.W.

    1984-01-01

    The paper provides a review, which is mainly of a statistical nature, of 260 reactor years of operating experience which the (United Kingdom) Central Electricity Generating Board (CEGB) has obtained with its gas-cooled, graphite moderated Magnox reactors. The main emphasis in the review is on safety rather than on availability. Data are provided on the overall incidence and frequencies of faults and it is shown that the plant items which are predominantly responsible for recorded faults are the gas circulators and the turbo-alternators. Analysis of the reactor trip experience shows that the incidence of events which necessitate an automatic shutdown of the reactor has been about one per reactor year and that of other events leading to a reactor trip has not been much higher (1.4 per reactor year). As would be expected from the length of the operating experience, some relatively rare events have occurred (expected frequency 10 -2 per reactor year, or less) but on each occasion the reactor shutdown system and decay heat removal systems functioned satisfactorily. No overheating of, or damage to, the fuel occurred as a result of these rare events or of other, more frequent, faults. Analysis of the trend of failure rates has shown an improvement with time in nearly all safety-related items and external inspection of the primary coolant circuits has shown no significant deterioration with time. However, some derating of the reactors has been necessary to reduce the effects of oxidation of mild steel in CO 2 , in order to obtain optimum service lives. In spite of major differences between the systems, a comparison of the failure rates of analogous systems and plant items in PWRs and the Magnox reactors show a considerable similarity. Overall, the review of CEGB's operational experience with its Magnos reactors has shown that the frequencies of faults in systems and plant items has been satisfyingly low. (author)

  8. MPPT Schemes for PV System under Normal and Partial Shading Condition: A Review

    Directory of Open Access Journals (Sweden)

    Malik Sameeullah

    2016-08-01

    Full Text Available The photovoltaic system is one of the renewable energy device, which directly converts solar radiation into electricity. The I-V characteristics of PV system are nonlinear in nature and under variable Irradiance and temperature, PV system has a single operating point where the power output is maximum, known as Maximum Power Point (MPP and the point varies on changes in atmospheric conditions and electrical load. Maximum Power Point Tracker (MPPT is used to track MPP of solar PV system for maximum efficiency operation. The various MPPT techniques together with implementation are reported in literature. In order to choose the best technique based upon the requirements, comprehensive and comparative study should be available. The aim of this paper is to present a comprehensive review of various MPPT techniques for uniform insolation and partial shading conditions. Furthermore, the comparison of practically accepted and widely used techniques has been made based on features, such as control strategy, type of circuitry, number of control variables and cost. This review work provides a quick analysis and design help for PV systems. Article History: Received March 14, 2016; Received in revised form June 26th 2016; Accepted July 1st 2016; Available online How to Cite This Article: Sameeullah, M. and Swarup, A. (2016. MPPT Schemes for PV System under Normal and Partial Shading Condition: A Review. Int. Journal of Renewable Energy Development, 5(2, 79-94. http://dx.doi.org/10.14710/ijred.5.2.79-94 

  9. Accelerating and benchmarking operating system functions in a “soft” system

    Directory of Open Access Journals (Sweden)

    Péter Molnár

    2015-06-01

    Full Text Available The todays computing technology provokes serious debates whether the operating system functions are implemented in the best possible way. The suggestions range from accelerating only certain functions through providing complete real-time operating systems as coprocessors to using simultaneously hardware and software implemented threads in the operating system. The performance gain in such systems depends on many factors, so its quantification is not a simple task at all. In addition to the subtleties of operating systems, the hardware accelerators in modern processors may considerably affect the results of such measurements. The reconfigurable systems offer a platform, where even end users can carry out reliable and accurate measurements. The paper presents a hardware acceleration idea for speeding up a simple OS service, its verification setup and the measurement results.

  10. Experience on operational safety improvement of control and operation support systems

    International Nuclear Information System (INIS)

    Itoh, N.; Nakagawa, T.; Mano, K.

    1988-01-01

    Japanese nuclear industry started in 1956 and about 30 years have passed since that time. Through these years, we have made a lot of efforts and developments in the field of Control and Instrumentation (C and I) system. The above 30 years and following years can be divided into four major periods. The first one is the period of research, the second of domestic production, the third of improvement, and the fourth of advancement. Improvements of C and I system, which we have made in those periods have made a great contribution to enhancement of reliability, availability and operability of nuclear power plants. Fig. 1 shows TEPCO's nuclear power plant (BWR) construction experience and technical trend of C and I system in Japan. This paper is to introduce the efforts and operational experience on control and operation support systems

  11. Towards a network operating system

    OpenAIRE

    López Álvarez, Victor; Gonzalez de Dios, Oscar; Fuentes, Beatriz; Yannuzzi, Marcelo; Fernández Palacios, Juan Pedro; Lopez, Diego

    2014-01-01

    A Network Operating System (NetOS) is a novel paradigm for developing a next-generation network management and operation platform. As we shall describe, NetOS not only goes far beyond the SDN concepts but also constitutes a fundamental enabler for NFV. © 2014 OSA.

  12. Intelligent systems supporting the control room operators

    International Nuclear Information System (INIS)

    Berger, E.

    1997-01-01

    The operational experience obtained with the various applications of the systems discussed in this paper shows that more consequent use of the systems will make detection and management of disturbances still more efficient and faster. This holds true both for a low level of process automation and for power plants with a high level of automation. As for conventional power plants, the trend clearly is towards higher degrees of automation and consequent application of supporting systems. Thus, higher availability and rapid failure management are achieved, at low effects on normal operation. These systems are monitoring and process control systems, expert systems, and systems for optimal use of the equipment, or systems for post-incident analyses and computer-assisted on-shift protocols, or operating manuals. (orig./CB) [de

  13. Adaptive neuro-fuzzy and expert systems for power quality analysis and prediction of abnormal operation

    Science.gov (United States)

    Ibrahim, Wael Refaat Anis

    The present research involves the development of several fuzzy expert systems for power quality analysis and diagnosis. Intelligent systems for the prediction of abnormal system operation were also developed. The performance of all intelligent modules developed was either enhanced or completely produced through adaptive fuzzy learning techniques. Neuro-fuzzy learning is the main adaptive technique utilized. The work presents a novel approach to the interpretation of power quality from the perspective of the continuous operation of a single system. The research includes an extensive literature review pertaining to the applications of intelligent systems to power quality analysis. Basic definitions and signature events related to power quality are introduced. In addition, detailed discussions of various artificial intelligence paradigms as well as wavelet theory are included. A fuzzy-based intelligent system capable of identifying normal from abnormal operation for a given system was developed. Adaptive neuro-fuzzy learning was applied to enhance its performance. A group of fuzzy expert systems that could perform full operational diagnosis were also developed successfully. The developed systems were applied to the operational diagnosis of 3-phase induction motors and rectifier bridges. A novel approach for learning power quality waveforms and trends was developed. The technique, which is adaptive neuro fuzzy-based, learned, compressed, and stored the waveform data. The new technique was successfully tested using a wide variety of power quality signature waveforms, and using real site data. The trend-learning technique was incorporated into a fuzzy expert system that was designed to predict abnormal operation of a monitored system. The intelligent system learns and stores, in compressed format, trends leading to abnormal operation. The system then compares incoming data to the retained trends continuously. If the incoming data matches any of the learned trends, an

  14. Treatment system operation, management, and finance

    Energy Technology Data Exchange (ETDEWEB)

    Truax, D.D. (Mississippi State Univ., Mississippi State (United States))

    1990-06-01

    This article deals with literature on operation, management, and financing of wastewater treatment plants. Some topics discussed are system hydraulics and flow monitoring, odor, reliability, equipment age, management philosophy, performance, reducing operating cost, planning and response to emergencies, preventative maintenance, inspection systems, mechanical vibrations, safety, privatization, municipal leasing, user and impact fees.

  15. A Computuerized Operator Support System Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States); Boring, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lew, Roger [Idaho National Lab. (INL), Idaho Falls, ID (United States); Ulrich, Tom [Idaho National Lab. (INL), Idaho Falls, ID (United States); Villim, Richard [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-11-01

    A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based

  16. A Computuerized Operator Support System Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States); Boring, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lew, Roger [Idaho National Lab. (INL), Idaho Falls, ID (United States); Ulrich, Tom [Idaho National Lab. (INL), Idaho Falls, ID (United States); Villim, Richard [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-08-01

    A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based

  17. DOE High Performance Computing Operational Review (HPCOR): Enabling Data-Driven Scientific Discovery at HPC Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, Richard; Allcock, William; Beggio, Chris; Campbell, Stuart; Cherry, Andrew; Cholia, Shreyas; Dart, Eli; England, Clay; Fahey, Tim; Foertter, Fernanda; Goldstone, Robin; Hick, Jason; Karelitz, David; Kelly, Kaki; Monroe, Laura; Prabhat,; Skinner, David; White, Julia

    2014-10-17

    U.S. Department of Energy (DOE) High Performance Computing (HPC) facilities are on the verge of a paradigm shift in the way they deliver systems and services to science and engineering teams. Research projects are producing a wide variety of data at unprecedented scale and level of complexity, with community-specific services that are part of the data collection and analysis workflow. On June 18-19, 2014 representatives from six DOE HPC centers met in Oakland, CA at the DOE High Performance Operational Review (HPCOR) to discuss how they can best provide facilities and services to enable large-scale data-driven scientific discovery at the DOE national laboratories. The report contains findings from that review.

  18. Independent engineering review of the Hanford Waste Vitrification System

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Waste Vitrification Plant (HWVP) was initiated in June 1987. The HWVP is an essential element of the plan to end present interim storage practices for defense wastes and to provide for permanent disposal. The project start was justified, in part, on efficient technology and design information transfer from the prototype Defense Waste Processing Facility (DWPF). Development of other serial Hanford Waste Vitrification System (HWVS) elements, such as the waste retrieval system for the double-shell tanks (DSTs), and the pretreatment system to reduce the waste volume converted into glass, also was required to accomplish permanent waste disposal. In July 1991, at the time of this review, the HWVP was in the Title 2 design phase. The objective of this technical assessment is to determine whether the status of the technology development and engineering practice is sufficient to provide reasonable assurance that the HWVP and the balance of the HWVS system will operate in an efficient and cost-effective manner. The criteria used to facilitate a judgment of potential successful operation are: vitrification of high-level radioactive waste from specified DSTs on a reasonably continuous basis; and glass produced with physical and chemical properties formally acknowledge as being acceptable for disposal in a repository for high-level radioactive waste. The criteria were proposed specifically for the Independent Engineering Review to focus that assessment effort. They are not represented as the criteria by which the Department will judge the prudence of the Project. 78 refs., 10 figs., 12 tabs

  19. Independent engineering review of the Hanford Waste Vitrification System

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    The Hanford Waste Vitrification Plant (HWVP) was initiated in June 1987. The HWVP is an essential element of the plan to end present interim storage practices for defense wastes and to provide for permanent disposal. The project start was justified, in part, on efficient technology and design information transfer from the prototype Defense Waste Processing Facility (DWPF). Development of other serial Hanford Waste Vitrification System (HWVS) elements, such as the waste retrieval system for the double-shell tanks (DSTs), and the pretreatment system to reduce the waste volume converted into glass, also was required to accomplish permanent waste disposal. In July 1991, at the time of this review, the HWVP was in the Title 2 design phase. The objective of this technical assessment is to determine whether the status of the technology development and engineering practice is sufficient to provide reasonable assurance that the HWVP and the balance of the HWVS system will operate in an efficient and cost-effective manner. The criteria used to facilitate a judgment of potential successful operation are: vitrification of high-level radioactive waste from specified DSTs on a reasonably continuous basis; and glass produced with physical and chemical properties formally acknowledge as being acceptable for disposal in a repository for high-level radioactive waste. The criteria were proposed specifically for the Independent Engineering Review to focus that assessment effort. They are not represented as the criteria by which the Department will judge the prudence of the Project. 78 refs., 10 figs., 12 tabs.

  20. Operator approach to linear control systems

    CERN Document Server

    Cheremensky, A

    1996-01-01

    Within the framework of the optimization problem for linear control systems with quadratic performance index (LQP), the operator approach allows the construction of a systems theory including a number of particular infinite-dimensional optimization problems with hardly visible concreteness. This approach yields interesting interpretations of these problems and more effective feedback design methods. This book is unique in its emphasis on developing methods for solving a sufficiently general LQP. Although this is complex material, the theory developed here is built on transparent and relatively simple principles, and readers with less experience in the field of operator theory will find enough material to give them a good overview of the current state of LQP theory and its applications. Audience: Graduate students and researchers in the fields of mathematical systems theory, operator theory, cybernetics, and control systems.

  1. Prolonged Operative Duration Increases Risk of Surgical Site Infections: A Systematic Review.

    Science.gov (United States)

    Cheng, Hang; Chen, Brian Po-Han; Soleas, Ireena M; Ferko, Nicole C; Cameron, Chris G; Hinoul, Piet

    The incidence of surgical site infection (SSI) across surgical procedures, specialties, and conditions is reported to vary from 0.1% to 50%. Operative duration is often cited as an independent and potentially modifiable risk factor for SSI. The objective of this systematic review was to provide an in-depth understanding of the relation between operating time and SSI. This review included 81 prospective and retrospective studies. Along with study design, likelihood of SSI, mean operative times, time thresholds, effect measures, confidence intervals, and p values were extracted. Three meta-analyses were conducted, whereby odds ratios were pooled by hourly operative time thresholds, increments of increasing operative time, and surgical specialty. Pooled analyses demonstrated that the association between extended operative time and SSI typically remained statistically significant, with close to twice the likelihood of SSI observed across various time thresholds. The likelihood of SSI increased with increasing time increments; for example, a 13%, 17%, and 37% increased likelihood for every 15 min, 30 min, and 60 min of surgery, respectively. On average, across various procedures, the mean operative time was approximately 30 min longer in patients with SSIs compared with those patients without. Prolonged operative time can increase the risk of SSI. Given the importance of SSIs on patient outcomes and health care economics, hospitals should focus efforts to reduce operative time.

  2. Remote mixed oxide fabrication facility development. Volume 2. State-of-the-art review of remote maintenance system technology

    International Nuclear Information System (INIS)

    Horgos, R.M.; Masch, M.L.

    1979-06-01

    This report provides a state-of-the-art review of remote systems technology, which includes manipulators, process connectors, vision systems and specialized process systems. A proposed mixed oxide fuel fabrication facility was reviewed and evaluated for identification of major remote maintenance and repair tasks. The technological areas were evaluated on the basis of their suitability or applicability for remote maintenance and repair of a proposed fully remote operating mixed oxide fuel fabrication facility. A technological base exists from which the design criteria for a reliable, remote operating facility can be established. Commercially available systems and components, along with those remote technologies now in development, will require modifications to adapt them to specific plant designs and requirements

  3. Methodology for Designing Operational Banking Risks Monitoring System

    Science.gov (United States)

    Kostjunina, T. N.

    2018-05-01

    The research looks at principles of designing an information system for monitoring operational banking risks. A proposed design methodology enables one to automate processes of collecting data on information security incidents in the banking network, serving as the basis for an integrated approach to the creation of an operational risk management system. The system can operate remotely ensuring tracking and forecasting of various operational events in the bank network. A structure of a content management system is described.

  4. Software fault tolerance in computer operating systems

    Science.gov (United States)

    Iyer, Ravishankar K.; Lee, Inhwan

    1994-01-01

    This chapter provides data and analysis of the dependability and fault tolerance for three operating systems: the Tandem/GUARDIAN fault-tolerant system, the VAX/VMS distributed system, and the IBM/MVS system. Based on measurements from these systems, basic software error characteristics are investigated. Fault tolerance in operating systems resulting from the use of process pairs and recovery routines is evaluated. Two levels of models are developed to analyze error and recovery processes inside an operating system and interactions among multiple instances of an operating system running in a distributed environment. The measurements show that the use of process pairs in Tandem systems, which was originally intended for tolerating hardware faults, allows the system to tolerate about 70% of defects in system software that result in processor failures. The loose coupling between processors which results in the backup execution (the processor state and the sequence of events occurring) being different from the original execution is a major reason for the measured software fault tolerance. The IBM/MVS system fault tolerance almost doubles when recovery routines are provided, in comparison to the case in which no recovery routines are available. However, even when recovery routines are provided, there is almost a 50% chance of system failure when critical system jobs are involved.

  5. Simple visual review of pre- to post-operative renal ultrasound images predicts pyeloplasty success equally as well as geometric measurements: A blinded comparison with a gold standard.

    Science.gov (United States)

    Kern, Adam J M; Schlomer, Bruce J; Timberlake, Matthew D; Peters, Craig A; Hammer, Matthew R; Jacobs, Micah A

    2017-08-01

    MAG3 diuretic renal scan remains the gold standard for determination of improvement in renal drainage following pyeloplasty for ureteropelvic junction obstruction. We hypothesized that (i) a change in geometric measurements between pre-operative and post-operative renal ultrasound (RUS) images and (ii) blinded simple visual review of images both would predict pyeloplasty success. To determine if simple visual review and/or novel geometric measurement of renal ultrasounds can detect pyeloplasty failure. This study was a retrospective, blinded comparison with a gold standard. Included were children aged ≤18 years undergoing pyeloplasty at our institution from 2009 to 2015. For each kidney, representative pre-operative and post-operative RUS images were chosen. Our standard for pyeloplasty success was improved drainage curve on MAG3 and lack of additional surgery. Measurements for collecting system circularity, roundness, and renal parenchymal to collecting system area ratio (RPCSR) were obtained by three raters (Figure), who were blinded to the outcome of the pyeloplasty. Changes in geometric measurements were analyzed as a diagnostic test for MAG3-defined pyeloplasty success using ROC curve analysis. In addition, six reviewers blinded to pyeloplasty success reviewed pre-operative and post-operative images visually for improved hydronephrosis and categorized pyeloplasty as success or failure based on simple visual review of RUS. Fifty-three repaired renal units were identified (50 children). There were five pyeloplasty failures, four of which underwent revision or nephrectomy. While all geometric measurements could discriminate pyeloplasty failure and success, the geometric measurements that discriminated best between pyeloplasty failure and success were change in collecting system roundness and change in RPCSR. Consensus opinion among six blinded reviewers using simple visual review had a sensitivity of 94% and PPV of 100% with respect to identifying pyeloplasty

  6. Information management system for design, construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Bolch, M.C.; Jones, C.R.

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software

  7. Information management system for design, construction and operation of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Bolch, M.C. (Duke Power Co. (US)); Jones, C.R. (S. Levy Inc. (US))

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software.

  8. Perfect commuting-operator strategies for linear system games

    Science.gov (United States)

    Cleve, Richard; Liu, Li; Slofstra, William

    2017-01-01

    Linear system games are a generalization of Mermin's magic square game introduced by Cleve and Mittal. They show that perfect strategies for linear system games in the tensor-product model of entanglement correspond to finite-dimensional operator solutions of a certain set of non-commutative equations. We investigate linear system games in the commuting-operator model of entanglement, where Alice and Bob's measurement operators act on a joint Hilbert space, and Alice's operators must commute with Bob's operators. We show that perfect strategies in this model correspond to possibly infinite-dimensional operator solutions of the non-commutative equations. The proof is based around a finitely presented group associated with the linear system which arises from the non-commutative equations.

  9. A moral Operating System of livestock farming

    NARCIS (Netherlands)

    Gremmen, Bart

    2017-01-01

    Societal views about livestock production systems in Europe are changing dramatically in a negative direction. Based on the tradition of pragmatism in applied philosophy I develop a Moral Operating System of animal production systems in cooperating a plurality of ethical views. This moral operating

  10. The Launch Systems Operations Cost Model

    Science.gov (United States)

    Prince, Frank A.; Hamaker, Joseph W. (Technical Monitor)

    2001-01-01

    One of NASA's primary missions is to reduce the cost of access to space while simultaneously increasing safety. A key component, and one of the least understood, is the recurring operations and support cost for reusable launch systems. In order to predict these costs, NASA, under the leadership of the Independent Program Assessment Office (IPAO), has commissioned the development of a Launch Systems Operations Cost Model (LSOCM). LSOCM is a tool to predict the operations & support (O&S) cost of new and modified reusable (and partially reusable) launch systems. The requirements are to predict the non-recurring cost for the ground infrastructure and the recurring cost of maintaining that infrastructure, performing vehicle logistics, and performing the O&S actions to return the vehicle to flight. In addition, the model must estimate the time required to cycle the vehicle through all of the ground processing activities. The current version of LSOCM is an amalgamation of existing tools, leveraging our understanding of shuttle operations cost with a means of predicting how the maintenance burden will change as the vehicle becomes more aircraft like. The use of the Conceptual Operations Manpower Estimating Tool/Operations Cost Model (COMET/OCM) provides a solid point of departure based on shuttle and expendable launch vehicle (ELV) experience. The incorporation of the Reliability and Maintainability Analysis Tool (RMAT) as expressed by a set of response surface model equations gives a method for estimating how changing launch system characteristics affects cost and cycle time as compared to today's shuttle system. Plans are being made to improve the model. The development team will be spending the next few months devising a structured methodology that will enable verified and validated algorithms to give accurate cost estimates. To assist in this endeavor the LSOCM team is part of an Agency wide effort to combine resources with other cost and operations professionals to

  11. [Intelligent systems tools in the diagnosis of acute coronary syndromes: A systemic review].

    Science.gov (United States)

    Sprockel, John; Tejeda, Miguel; Yate, José; Diaztagle, Juan; González, Enrique

    2017-03-27

    Acute myocardial infarction is the leading cause of non-communicable deaths worldwide. Its diagnosis is a highly complex task, for which modelling through automated methods has been attempted. A systematic review of the literature was performed on diagnostic tests that applied intelligent systems tools in the diagnosis of acute coronary syndromes. A systematic review of the literature is presented using Medline, Embase, Scopus, IEEE/IET Electronic Library, ISI Web of Science, Latindex and LILACS databases for articles that include the diagnostic evaluation of acute coronary syndromes using intelligent systems. The review process was conducted independently by 2 reviewers, and discrepancies were resolved through the participation of a third person. The operational characteristics of the studied tools were extracted. A total of 35 references met the inclusion criteria. In 22 (62.8%) cases, neural networks were used. In five studies, the performances of several intelligent systems tools were compared. Thirteen studies sought to perform diagnoses of all acute coronary syndromes, and in 22, only infarctions were studied. In 21 cases, clinical and electrocardiographic aspects were used as input data, and in 10, only electrocardiographic data were used. Most intelligent systems use the clinical context as a reference standard. High rates of diagnostic accuracy were found with better performance using neural networks and support vector machines, compared with statistical tools of pattern recognition and decision trees. Extensive evidence was found that shows that using intelligent systems tools achieves a greater degree of accuracy than some clinical algorithms or scales and, thus, should be considered appropriate tools for supporting diagnostic decisions of acute coronary syndromes. Copyright © 2017 Instituto Nacional de Cardiología Ignacio Chávez. Publicado por Masson Doyma México S.A. All rights reserved.

  12. Interfacing system isolation experience review. Final report, August 1991

    International Nuclear Information System (INIS)

    1991-08-01

    A light water reactor power plant has auxiliary systems interconnected with the reactor coolant system that are not designed for reactor operating pressure. These principally include the shutdown heat removal systems and various emergency core cooling injection systems. There are multiple isolation valves that prevent rector vessel pressure from causing overpressurization in low pressure interfacing systems. Combinations of hardware failures or operational errors are necessary to expose these systems to overpressurization. This experience review provides insights regarding the risk that an auxiliary system might become over pressurized from the reactor system. While analyses show that for the pressures involved the probability of auxiliary system failure is low, the auxiliary system conceivably might fail outside of containment while the plant is at power. Such a potential event has come to be called an interfacing system loss of coolant accident (ISLOCA). This report provides a compilation of occurrences where valve leakage, valve failure, or valve mispositioning played a role in the ability to maintain interfacing system isolation. Seventeen U.S. BWR events, twenty three U.S. PWR events and one foreign event are discussed in the report. Eleven of the U.S. BWR events and ten U.S. PWR events are judged to relate directly to the so-called ISLOCA event in that they fulfilled one or more of the failures necessary to cause an ISLOCA. (author)

  13. Utility systems operation: Optimisation-based decision making

    International Nuclear Information System (INIS)

    Velasco-Garcia, Patricia; Varbanov, Petar Sabev; Arellano-Garcia, Harvey; Wozny, Guenter

    2011-01-01

    Utility systems provide heat and power to industrial sites. The importance of operating these systems in an optimal way has increased significantly due to the unstable and in the long term rising prices of fossil fuels as well as the need for reducing the greenhouse gas emissions. This paper presents an analysis of the problem for supporting operator decision making under conditions of variable steam demands from the production processes on an industrial site. An optimisation model has been developed, where besides for running the utility system, also the costs associated with starting-up the operating units have been modelled. The illustrative case study shows that accounting for the shut-downs and start-ups of utility operating units can bring significant cost savings. - Highlights: → Optimisation methodology for decision making on running utility systems. → Accounting for varying steam demands. → Optimal operating specifications when a demand change occurs. → Operating costs include start-up costs of boilers and other units. → Validated on a real-life case study. Up to 20% cost savings are possible.

  14. Operational readiness review for the Waste Experimental Reduction Facility. Final report

    International Nuclear Information System (INIS)

    1993-11-01

    An Operational Readiness Review (ORR) at the Idaho National Engineering Laboratory's (INEL's) Waste Experimental Reduction Facility (WERF) was conducted by EG ampersand G Idaho, Inc., to verify the readiness of WERF to resume operations following a shutdown and modification period of more than two years. It is the conclusion of the ORR Team that, pending satisfactory resolution of all pre-startup findings, WERF has achieved readiness to resume unrestricted operations within the approved safety basis. ORR appraisal forms are included in this report

  15. Transferring Knowledge from Building Operation to Design: A literature review

    DEFF Research Database (Denmark)

    Rasmussen, Helle Lohmann; Jensen, Per Anker; Gregg, Jay Sterling

    . Knowing that the list lacks inputs from cultural and organizational theory, the paper suggests that further research should focus on taking these suggestions to an operational level for the benefit of FM, building clients and design teams. Furthermore, it is found that major concepts that could......As a solution to the previously identified gap between expected and actual building performance, this paper investigates how knowledge can be transferred from operation to design. This is assumed to help bridge the gap and increase the performance of new built facilities. By conducting a systematic...... literature review, it is found, that the theoretical approach in the reviewed articles has a significant impact on the level of how applicable the recommendations are in practice. Furthermore, a list of identified tools to enable knowledge transfer is provided, including POE, PPP and building commissioning...

  16. Cluff Lake mill operations - a historical review

    International Nuclear Information System (INIS)

    Schnell, H.A.; Doell, E.; Corpus, E.

    2000-01-01

    The Cluff Lake operation started uranium production in 1980 and has produced over 50 million pounds of uranium since that time. The plant started with high grade ore (+30% U) processing and went through a series of modifications to its present operating status: Phase 1 - High-grade ore (+30% U) processing with acid leach and iron cake precipitation followed by direct yellowcake precipitation. Lower grade ore was concentrated in a gravity circuit to +30% U; Phase 1 1/2 - Reprocessing Phase 1 gravity tailings (+1% U) in an acid leach circuit with solvent extraction purification prior to yellowcake precipitation; Reprocessing of the Phase 1 leach tails (58 g/t Au) to recover gold in a Cyanide/CIP circuit followed by additional uranium recovery, and destruction and recycle of cyanide by volatilization; and Phase 2 - Treatment of the lower grade ore (0.5 to 1% U) at an increased tonnage with an acid leach, CCD, SX circuit as it is found in the existing plant. This paper will review the various processing circuits used during the phases of the Cluff Lake Mill from first uranium production to the present operation. (author)

  17. A review of the environmental survivability of telerobotic control sensor systems for use in nuclear waste tanks

    International Nuclear Information System (INIS)

    Holcomb, D.E.; Burks, B.L.

    1994-05-01

    This report was prepared by the Oak Ridge National Laboratory (ORNL) and funded by the Department of Energy (DOE) Office of Technology Development (OTD) Robotics Technology Development Program (RTDP). During the next few years field deployment of remotely operated systems in nuclear waste cleanup operations will increase dramatically as DOE strives to efficiently and safely remediate the many waste storage sites. Typically, the most fragile components in remote systems are the sensors that provide feedback to the operators or to computer control algorithms. The purpose of this review is to determine the availability of environmentally hardened sensors to support control of a manipulator or vehicle system in a waste tank environment. The emphasis of the report is on the environmental ruggedness of currently available sensors. For the purpose of this review a set of nominal requirements for survivability were adopted conditions in the single-shell tanks at Hanford. This report is designed to be a practical guide to the state of the art in commercially available environmentally tolerant sensors for use with robotic systems. It is neither intended to be an exhaustive review of the technical literature on potential measurement techniques nor a complete physical review of the functioning of particular sensor systems. This report is intended to be a living document. As additional, corrected, or updated information is received from sensor manufacturers, it will be incorporated into the report database. The physical report will then be periodically revised and released in updated format. The authors wish to apologize to any sources of environmentally hardened sensors that were omitted during this review and encourage submission of new or updated data

  18. Institutionalization of safety re-assessment system for operating nuclear power plants

    International Nuclear Information System (INIS)

    Kim, H. J.; Cho, J. C.; Min, B. K.; Park, J. S.; Jung, H. D.; Oh, K. M.; Kim, W. K.; Lim, J. H.

    1999-01-01

    In this study, in-depth reviews of the foreign countries' experiences and practices in applications of the periodic safety review (PSR), backfitting and license renewal systems as well as the current status of nuclear power safety assurance programs and activities in Korea have been performed to investigate the necessity and feasibility of the application of the systems for the domestic operating nuclear power plants and to establish effective strategy and methodology for the institutionalization of a periodic safety re-assessment system appropriate to both the domestic and international nuclear power environments by incorporating the PSR with the backfitting and license renewal systems. For these purposes, the regulatory policy, fundamental principles and detailed requirements for the institutionalization of the safety re-assessment system and the effective measures for active implementation of the backfitting program have been developed and then a comparative study of benefits and shortcomings has been conducted for the three different models of the periodic safety re-assessment system incorporated with either the license renewal or life extension process, which have been considered as practicable ones in the domestic situation. The model chosen in this study as the most appropriate safety re-assessment system is the one that the re-assessments are performed at the interval of ten years throughout the service life of nuclear power plant and the ten-year license renewal or life extension after the expiration of design life can be permitted based on the regulatory review of the re-assessment results and follow-up measures. Finally, this paper has discussed on the details of the requirements, approach and procedures established for the institutionalization of the periodic safety re-assessment system chosen as the most appropriate one for domestic applications

  19. NASA Customer Data and Operations System

    Science.gov (United States)

    Butler, Madeline J.; Stallings, William H.

    1991-01-01

    In addition to the currently provided NASA services such as Communications and Tracking and Data Relay Satellite System services, the NASA's Customer Data and Operations System (CDOS) will provide the following services to the user: Data Delivery Service, Data Archive Service, and CDOS Operations Management Service. This paper describes these services in detail and presents respective block diagrams. The CDOS services will support a variety of multipurpose missions simultaneously with centralized and common hardware and software data-driven systems.

  20. An Analysis of the Reflector Cooling System Repair Status after the Initial Operation of HANARO

    Energy Technology Data Exchange (ETDEWEB)

    Park, Young Chul; Seo, Kyoung Woo; Chi, Dae Young; Yoon, Hyun Gi [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Park, Jung Geun [Safety Evaluation Department, System D and D Co., Daejeon (Korea, Republic of)

    2011-05-15

    HANARO, an open-tank-in-pool type multi-purpose research reactor of 30 MWth power in Korea, has been operating normally since its initial criticality in February, 1995. During the last operation period of HANARO, when a trouble occurred, the trouble was fixed on site. As preventive maintenance can reduce the corrective maintenance, the reasons of the occurred troubles are reviewed to prepare preventive maintenance. About twelve hundred cases of work requests and nonconformance reports (NCRs) have been issued since the initial criticality of HANARO. The cases are analyzed according to the trouble status, the trouble equipment function and the cause of the major trouble for reflector cooling system (RCS, hereinafter) including cover gas system and leakage monitoring and collection system

  1. Expert system aided operator's mental activities training

    International Nuclear Information System (INIS)

    Gieci, A.; Macko, J.; Mosny, J.; Gese, A.

    1994-01-01

    The operator's mental activity is the most important part of his work. A processing of a large amount of the information by the operator is possible only if he/she possesses appropriate cognitive skills. To facilitate the novice's acquisition of the experienced operator's cognitive skills of the decision-making process a special type of the expert system was developed. The cognitive engineering's models and problem-solving methodology constitutes the basis of this expert system. The article gives an account of the prototype of the mentioned expert system developed to aid the whole mental activity of the nuclear power plant operator during his decision-making process. (author). 6 refs, 6 figs

  2. Operation quality assessment model for video conference system

    Science.gov (United States)

    Du, Bangshi; Qi, Feng; Shao, Sujie; Wang, Ying; Li, Weijian

    2018-01-01

    Video conference system has become an important support platform for smart grid operation and management, its operation quality is gradually concerning grid enterprise. First, the evaluation indicator system covering network, business and operation maintenance aspects was established on basis of video conference system's operation statistics. Then, the operation quality assessment model combining genetic algorithm with regularized BP neural network was proposed, which outputs operation quality level of the system within a time period and provides company manager with some optimization advice. The simulation results show that the proposed evaluation model offers the advantages of fast convergence and high prediction accuracy in contrast with regularized BP neural network, and its generalization ability is superior to LM-BP neural network and Bayesian BP neural network.

  3. Test, Control and Monitor System (TCMS) operations plan

    Science.gov (United States)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  4. Operator reliability assessment system (OPERAS)

    International Nuclear Information System (INIS)

    Spurgin, A.J.; Hallam, J.W.; Spurgin, J.P.; Singh, A.

    1991-01-01

    The paper gives an overview of the OPERAS project. It discusses the background which led to the design of the PC-based data collection and analysis system connected to plant training simulators including those used for nuclear power plants. The usefulness of a system like OPERAS was perceived during an earlier EPRI project, the Operator Reliability Experiments project, by EPRI and PG and E. The data collection and analysis approaches used in OPERAS were developed during the ORE project. The paper not only discusses the design of OPERAS but discusses the functions performed and the current experiences with the two prototype systems. Also listed are potential uses of OPERAS by utility personnel in Operations, Training and PRA groups

  5. Numerical modelling of multi-vane expander operating conditions in ORC system

    Directory of Open Access Journals (Sweden)

    Rak Józef

    2017-01-01

    Full Text Available Multi-vane expanders are positive displacement volumetric machines which are nowadays considered for application in micro-power domestic ORC systems as promising alternative to micro turbines and other volumetric expanders. The multi-vane expander features very simple design, low gas flow capacity, low expansion ratios, an advantageous ratio of the power output to the external dimensions and are insensitive to the negative influence of the gas-liquid mixture expansion. Moreover, the multi-vane expander can be easily hermetically sealed, which is one of the key issues in the ORC system design. A literature review indicates that issues concerning the application of multi-vane expanders in such systems, especially related to operating of multi-vane expander with different low-boiling working fluids, are innovative, not fully scientifically described and have the potential for practical implementation. In this paper the results of numerical investigations on multi-vane expander operating conditions are presented. The analyses were performed on three-dimensional numerical model of the expander in ANSYS CFX software. The numerical model of the expander was validated using the data obtained from the experiment carried out on a lab test-stand. Then a series of computational analysis were performed using expanders' numerical model in order to determine its operating conditions under various flow conditions of different working fluids.

  6. Modernisation of the CERN operational dosimetery system

    CERN Multimedia

    Caroline Duc

    2013-01-01

     As part of continual efforts to ensure the highest standards in the field of Radiation Protection, CERN is modernising its operational dosimetry system.   Pierre Carbonez, head of the Dosimetery and Instrument Calibration Service, with one of the new automatic operational dosimetery reader terminals. No more sheets of paper to record radiation doses at the entrance to the accelerators: the operational dosimetry system is being modernised! Since March, 50 automatic operational dosimeter reader terminals are in operation around the accelerator complex. Operational dosimeters (DMC) complement the "passive" dosimeters (DIS) and must be used every time you enter Controlled Radiation Areas. They measure the dose of radiation received by the exposed worker in real time and give a warning if the acceptable threshold is exceeded. The new dosimeter reader system allows the dosage recording procedure to be automated. “Every pers...

  7. Mission operations concepts for Earth Observing System (EOS)

    Science.gov (United States)

    Kelly, Angelita C.; Taylor, Thomas D.; Hawkins, Frederick J.

    1991-01-01

    Mission operation concepts are described which are being used to evaluate and influence space and ground system designs and architectures with the goal of achieving successful, efficient, and cost-effective Earth Observing System (EOS) operations. Emphasis is given to the general characteristics and concepts developed for the EOS Space Measurement System, which uses a new series of polar-orbiting observatories. Data rates are given for various instruments. Some of the operations concepts which require a total system view are also examined, including command operations, data processing, data accountability, data archival, prelaunch testing and readiness, launch, performance monitoring and assessment, contingency operations, flight software maintenance, and security.

  8. C-Division annual review and operating plan, August 1990

    Energy Technology Data Exchange (ETDEWEB)

    Morse, N.R.

    1990-11-01

    The Computing and Communications Division is responsible for the Laboratory's Integrated Computing Network as well as Laboratory-wide communications. Our computing network, used by 8000 people distributed throughout the nation, constitutes one of the most powerful scientific computing facilities in the world. The purpose of this publication is to inform our clients of our strategic and operating plans. We review major accomplishments since early 1989 and describe our strategic planning goals and specific projects that will guide our operations over the next couple of years. Our mission statement, planning considerations, and management policies and practices are also included.

  9. Long term operation of nuclear power plants – IAEA SALTO peer review service and its results

    Energy Technology Data Exchange (ETDEWEB)

    Krivanek, Robert, E-mail: r.krivanek@iaea.org

    2014-12-15

    Highlights: • SALTO peer review service is designed for reviewing of ageing management and NPPs’ preparedness LTO. • It has been established as an effective tool to review the compliance with IAEA safety standards. • The important issues for safe LTO are being identified by SALTO missions. • Analysis of those issues is provided in the paper. • This peer review service is strongly recommended for NPPs prior to entering LTO period. - Abstract: This paper presents main IAEA activities for safe long term operation (LTO) which includes establishment of IAEA Safety Standards and other LTO related documents, fostering information exchange and establishing databases and provision of SALTO (Safety Aspects of Long Term Operation) peer review service. This paper provides insights into IAEA SALTO peer review service objectives, scope and methodology. The SALTO peer review service was designed to assist nuclear power plant (NPP) operators in adopting a proper approach to LTO of their plants and in implementing complete and appropriate activities to ensure that plant safety will be maintained during the LTO period. The SALTO peer review service can also support regulators in establishing or improving regulatory and licensing strategies for LTO of NPPs. Issues derived from 19 SALTO missions and 2 LTO modules of OSART (Operational Safety Review Team) missions conducted during the period of 2005 to March 2014 are also analyzed in this paper.

  10. Operational safety improvement in OPR 1000

    International Nuclear Information System (INIS)

    Jung, Y.-E.

    2005-01-01

    Nuclear power operating experience management might be an important factor for the operational safety improvement. KHNP's nuclear information management system, called KONIS receives, distributes and manages all nuclear information from domestic and foreign, especially operating experience. Ulchin 3 and 4, the first units of OPR 1000 series operates several organizations regarding management of operating experience e.g. specialist group program, various task forces, equipment specialist system for operator, etc. Peer review is another contribution for nuclear safety. (author)

  11. The Information System for Operational Activity Organization as a Tool for Configuration Management in NPP

    International Nuclear Information System (INIS)

    Manchev, B. L.; Yordanova, V. S.; Nenkova, B. G.

    2008-01-01

    The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained. This conformity is maintained during the entire life cycle of the facility. CM ensures that during the entire operational life of the plant the following requirements are met: The basic design requirements of the plant are established, documented and maintained; The physical structures, systems and components (SSC) of the plant are in conformity with the design requirements; The physical and functional characteristics of the plant are correctly incorporated in the operational documentation and the documentation for repair, as well as in the documents for tests and training; The changes in the design documentation are incorporated in the physical configuration and the operative documentation; The changes in the design are minimized by management process for review according to approved criteria; The changes proposed in the equipment and documentation of the plant are estimated entirely with the purpose of determining their effect and are reviewed and approved by appropriate managing staff before their introduction. The information system for organization of the operational activity (IS OOA) consists of several modules used for storage and retrieval of data for different aspects of the operation of the equipment at the site of Kozloduy NPP, as defects and failures, design requirements and bases, design data and characteristics, tests, life time, maintenance and repair, as well as changes in the design or the design documentation. IS OOA consists of single relational database and provides built-in connections to the database of the SmartDoc system for control of the documentation, as well as to the database for human resources. Central place in IS OOA is taken by the 'Equipment' module while all other modules are connected with the identification data of the structures

  12. Advisory expert system for test rig operator

    International Nuclear Information System (INIS)

    Zielczynski, P.

    1994-01-01

    The advisory expert system MAESTRO (Modular Advisory Expert System for Test Rig Operator) has been designed to guide the operator of large experimental installation during start-up, steady state and shut down. The installation is located in the research reactor MARIA in the Institute of Atomic Energy in Swierk, Poland. The system acquires and analyses on line signals from installation and performs two tasks in real time: leading the operator and monitoring of the installation (including signal validation). Systems tasks, architecture and knowledge representation concepts are described. The system is based on expert systems techniques what makes in phases of continuous change of process parameters and it has been achieved by special knowledge representation allowing its dynamical modification. (author). 147 refs, 42 figs, 5 tab

  13. Programming languages and operating systems used in data base systems

    International Nuclear Information System (INIS)

    Radulescu, T.G.

    1977-06-01

    Some apsects of the use of the programming languages and operating systems in the data base systems are presented. There are four chapters in this paper. In the first chapter we present some generalities about the programming languages. In the second one we describe the use of the programming languages in the data base systems. A classification of the programming languages used in data base systems is presented in the third one. An overview of the operating systems is made in the last chapter. (author)

  14. Study of operational systems of gamma spectrometry systems

    International Nuclear Information System (INIS)

    Melo, M.C. de.

    1985-07-01

    The application of gamma spectrometers is tantamount to the perfect knowledge of their operational characteristics. Thus a study of the most significant characteristics (stability, linearity of response, energy resolution and peak efficiency) was carried out with an NaI(T1) and an (HP)Ge systems. Gamma standards with an energy range of 60 to 1300 KeV were used. Simple numerical methods were applied to the data, and the Behaviour of each system, with regard to the aforementioned characteristics, was observed for several operation voltages. It was evident the superiority of the (HP)Ge system in stability, linearity and resolution, whereas the NaI(T1) system showed a greater efficiency. The results obtained for each system were consistent with the ones found elsewhere, so that it may be concluded that both are working properly, and that the methodology proposed herein is appropriate for the test of such equipments [pt

  15. SYSTEM OF STANDARTIZATION OF CONSTRUCTION OPERATIONS ARRANGEMENT

    Directory of Open Access Journals (Sweden)

    Oleynik Pavel Pavlovich

    2012-10-01

    Full Text Available In the proposed article, management of construction operations is represented as a multi-level system; it is considered with the framework of projects including new construction, restructuring and overhaul of buildings and structures. The system of management of construction operations is to be composed of the following three constituent parts. They include a construction and assembling entity, project and operations, and a procurement base. Such matters as the quality of construction products, purchase (lease of building machinery and vehicles are incorporated into the level of the construction and assembling entity. The project level comprises such components of construction operations management as pre-construction preparation of a project, methods and forms of construction management, preparatory works, management of construction activities, real-time operations control, construction quality control, etc. The level of operations and the procurement base covers the needs for materials and equipment, their purchase and procurement, as well as the warehouse management. The main elements of the standardization system are identified. Standards of construction operations management are explained, including 1. General Provisions; 2. Preparation and performance of construction and assembling works; 3. New construction. Building site organization; 4. Demolition (dismantling of buildings and structures; 5. Rules of preparation for acceptance and commissioning of completed residential buildings. The prospects for the further development of the system of standardization of construction operations management are outlined

  16. Periodic safety review of operational nuclear power plants. A publication within the NUSS programme

    International Nuclear Information System (INIS)

    1994-01-01

    This Safety Guide which supplements the IAEA Safety Fundamentals: The Safety of Nuclear Installations and the Code on the Safety of Nuclear Power Plants: Operation, forms part of the Agency's programme, referred to as the NUSS programme, for establishing Codes and Guides relating to nuclear power plants. A list of NUSS publications is given at the end of this book. This Guide was drafted on the basis of a systematic review approach that was endorsed by the IAEA Conference on the Safety of Nuclear Power: Strategy for the Future. The purpose of this Safety Guide is to provide guidance on the conduct of Periodic Safety Reviews (PSRs) for an operational nuclear power plant. The Guide is directed at both owners/operators and regulators. This Safety Guide deals with the PSR of an operational nuclear power plant. A PSR is a comprehensive safety review addressing all important aspects of safety, carried out at regular intervals. 22 refs, 4 figs

  17. Stand-alone power systems for the future: Optimal design, operation and control of solar-hydrogen energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Ulleberg, Oeystein

    1998-12-31

    This thesis gives a systematic review of the fundamentals of energy systems, the governing physical and chemical laws related to energy, inherent characteristics of energy system, and the availability of the earth`s energy. It shows clearly why solar-hydrogen systems are one of the most viable options for the future. The main subject discussed is the modelling of SAPS (Stand-Alone Power Systems), with focus on photovoltaic-hydrogen energy systems. Simulation models for a transient simulation program are developed for PV-H{sub 2} components, including models for photovoltaics, water electrolysis, hydrogen storage, fuel cells, and secondary batteries. A PV-H{sub 2} demonstration plant in Juelich, Germany, is studied as a reference plant and the models validated against data from this plant. Most of the models developed were found to be sufficiently accurate to perform short-term system simulations, while all were more than accurate enough to perform long-term simulations. Finally, the verified simulation models are used to find the optimal operation and control strategies of an existing PV-H{sub 2} system. The main conclusion is that the simulation methods can be successfully used to find optimal operation and control strategies for a system with fixed design, and similar methods could be used to find alternative system designs. 148 refs., 78 figs., 31 tabs.

  18. Stand-alone power systems for the future: Optimal design, operation and control of solar-hydrogen energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Ulleberg, Oeystein

    1999-12-31

    This thesis gives a systematic review of the fundamentals of energy systems, the governing physical and chemical laws related to energy, inherent characteristics of energy system, and the availability of the earth`s energy. It shows clearly why solar-hydrogen systems are one of the most viable options for the future. The main subject discussed is the modelling of SAPS (Stand-Alone Power Systems), with focus on photovoltaic-hydrogen energy systems. Simulation models for a transient simulation program are developed for PV-H{sub 2} components, including models for photovoltaics, water electrolysis, hydrogen storage, fuel cells, and secondary batteries. A PV-H{sub 2} demonstration plant in Juelich, Germany, is studied as a reference plant and the models validated against data from this plant. Most of the models developed were found to be sufficiently accurate to perform short-term system simulations, while all were more than accurate enough to perform long-term simulations. Finally, the verified simulation models are used to find the optimal operation and control strategies of an existing PV-H{sub 2} system. The main conclusion is that the simulation methods can be successfully used to find optimal operation and control strategies for a system with fixed design, and similar methods could be used to find alternative system designs. 148 refs., 78 figs., 31 tabs.

  19. Expert system for operational personnel support during power unit operation control in regulation range

    International Nuclear Information System (INIS)

    Yanitskij, V.A.

    1992-01-01

    The problems met when developing the systems for NPP operator support in the process of power unit operation are considered. The expert system for NPP personnel intelligent support combining the properties belonging to the artificial intelligence systems including selection of the analysis method taking into account the concrete technological situation and capability of application of algothmic calculations of the equipment characteristics using the information accumulated during the system development, erection and operation is described

  20. Systemic Operational Design: Bringing Efficacy to the Operational Level of War

    National Research Council Canada - National Science Library

    Bernard, Barrett M

    2007-01-01

    The premise of this monograph is that the Elements of Operational Design are incapable of linking the tactical employment of forces to strategic objectives and that Systemic Operational Design is a viable alternative...

  1. Operating and maintenance experience with computer-based systems in nuclear power plants - A report by the PWG-1 Task Group on Computer-based Systems Important to Safety

    International Nuclear Information System (INIS)

    1998-01-01

    This report was prepared by the Task Group on Computer-based Systems Important to Safety of the Principal Working Group No. 1. Canada had a leading role in this study. Operating and Maintenance Experience with Computer-based Systems in nuclear power plants is essential for improving and upgrading against potential failures. The present report summarises the observations and findings related to the use of digital technology in nuclear power plants. It also makes recommendations for future activities in Member Countries. Continued expansion of digital technology in nuclear power reactor has resulted in new safety and licensing issues, since the existing licensing review criteria were mainly based on the analogue devices used when the plants were designed. On the industry side, a consensus approach is needed to help stabilise and standardise the treatment of digital installations and upgrades while ensuring safety and reliability. On the regulatory side, new guidelines and regulatory requirements are needed to assess digital upgrades. Upgrades or new installation issues always involve potential for system failures. They are addressed specifically in the 'hazard' or 'failure' analysis, and it is in this context that they ultimately are resolved in the design and addressed in licensing. Failure Analysis is normally performed in parallel with the design, verification and validation (V and V), and implementation activities of the upgrades. Current standards and guidelines in France, U.S. and Canada recognise the importance of failure analysis in computer-based system design. Thus failure analysis is an integral part of the design and implementation process and is aimed at evaluating potential failure modes and cause of system failures. In this context, it is essential to define 'System' as the plant system affected by the upgrade, not the 'Computer' system. The identified failures would provide input to the design process in the form of design requirements or design

  2. The Performance of an Object-Oriented, Parallel Operating System

    Directory of Open Access Journals (Sweden)

    David R. Kohr, Jr.

    1994-01-01

    Full Text Available The nascent and rapidly evolving state of parallel systems often leaves parallel application developers at the mercy of inefficient, inflexible operating system software. Given the relatively primitive state of parallel systems software, maximizing the performance of parallel applications not only requires judicious tuning of the application software, but occasionally, the replacement of specific system software modules with others that can more readily respond to the imposed pattern of resource demands. To assess the feasibility of application and performance tuning via malleable system software and to understand the performance penalties for detailed operating system performance data capture, we describe a set of performance instrumentation techniques for parallel, object-oriented operating systems and a set of performance experiments with Choices, an experimental, object-oriented operating system designed for use with parallel sys- tems. These performance experiments show that (a the performance overhead for operating system data capture is modest, (b the penalty for malleable, object-oriented operating systems is negligible, but (c techniques are needed to strictly enforce adherence of implementation to design if operating system modules are to be replaced.

  3. Planning Systems for Distributed Operations

    Science.gov (United States)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  4. Surface Moisture Measurement System Operation and Maintenance Manual

    International Nuclear Information System (INIS)

    Ritter, G.A.; Pearce, K.L.; Stokes, T.L.

    1995-12-01

    This operations and maintenance manual addresses deployment, equipment and field hazards, operating instructions, calibration verification, removal, maintenance, and other pertinent information necessary to safely operate and store the Surface Moisture Measurement System (SMMS) and Liquid Observation Well Moisture Measurement System (LOWMMS). These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  5. Non-technical skills of the operating theatre scrub nurse: literature review.

    Science.gov (United States)

    Mitchell, Lucy; Flin, Rhona

    2008-07-01

    This paper is a report of a review to identify the non-technical (cognitive and social) skills used by scrub nurses. Recognition that failures in non-technical skills contributed to accidents in high-risk industries led to the development of research programmes to study the role of cognition and social interactions in operational safety. Recently, psychological research in operating theatres has revealed the importance of non-technical skills in safe and efficient performance. Most of the studies to date have focused on anaesthetists and surgeons. On-line sources and university library catalogues, publications of the Association for Perioperative Practice, National Association of Theatre Nurses and Association of Peri-Operative Registered Nurses were searched in 2007. Studies were included in the review if they presented data from scrub nurses on one or more of their non-technical skills. These findings were examined in relation to an existing medical non-technical skills framework with categories of communication, teamwork, leadership, situation awareness and decision-making. Of 424 publications retrieved, 13 were reviewed in detail. Ten concerned communication and eight of those also had data on teamwork. In 11 papers teamwork was examined, and one focused on nurses' situation awareness, teamwork and communication. None of the papers we reviewed examined leadership or decision-making by scrub nurses. Further work is needed to identify formally the non-technical skills which are important to the role of scrub nurse and then to design training in the identified non-technical skills during the education and development of scrub nurses.

  6. Selecting a Cable System Operator.

    Science.gov (United States)

    Cable Television Information Center, Washington, DC.

    Intended to assist franchising authorities with the process of selecting a cable television system operator from franchise applicants, this document provides a framework for analysis of individual applications. Section 1 deals with various methods which can be used to select an operator. The next section covers the application form, the vehicle a…

  7. Real-time embedded systems open-source operating systems perspective

    CERN Document Server

    Bertolotti, Ivan Cibrario

    2012-01-01

    From the Foreword: "!the presentation of real-time scheduling is probably the best in terms of clarity I have ever read in the professional literature. Easy to understand, which is important for busy professionals keen to acquire (or refresh) new knowledge without being bogged down in a convoluted narrative and an excessive detail overload. The authors managed to largely avoid theoretical-only presentation of the subject, which frequently affects books on operating systems. ! an indispensable [resource] to gain a thorough understanding of the real-time systems from the operating systems p

  8. Interactive orbital proximity operations planning system

    Science.gov (United States)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1990-01-01

    An interactive graphical planning system for on-site planning of proximity operations in the congested multispacecraft environment about the space station is presented. The system shows the astronaut a bird's eye perspective of the space station, the orbital plane, and the co-orbiting spacecraft. The system operates in two operational modes: (1) a viewpoint mode, in which the astronaut is able to move the viewpoint around in the orbital plane to range in on areas of interest; and (2) a trajectory design mode, in which the trajectory is planned. Trajectory design involves the composition of a set of waypoints which result in a fuel-optimal trajectory which satisfies all operational constraints, such as departure and arrival constraints, plume impingement constraints, and structural constraints. The main purpose of the system is to present the trajectory and the constraints in an easily interpretable graphical format. Through a graphical interactive process, the trajectory waypoints are edited until all operational constraints are satisfied. A series of experiments was conducted to evaluate the system. Eight airline pilots with no prior background in orbital mechanics participated in the experiments. Subject training included a stand-alone training session of about 6 hours duration, in which the subjects became familiar with orbital mechanics concepts and performed a series of exercises to familiarize themselves with the control and display features of the system. They then carried out a series of production runs in which 90 different trajectory design situations were randomly addressed. The purpose of these experiments was to investigate how the planning time, planning efforts, and fuel expenditures were affected by the planning difficulty. Some results of these experiments are presented.

  9. EPICS: operating system independent device/driver support

    International Nuclear Information System (INIS)

    Kraimer, M.R.

    2003-01-01

    Originally EPICS input/output controllers (IOCs) were only supported on VME-based systems running the vxWorks operating system. Now IOCs are supported on many systems: vxWorks, RTEMS, Solaris, HPUX, Linux, WIN32, and Darwin. A challenge is to provide operating-system-independent device and driver support. This paper presents some techniques for providing such support. EPICS (Experimental Physics and Industrial Control System) is a set of software tools, libraries, and applications developed collaboratively and used worldwide to create distributed, real-time control systems for scientific instruments such as particle accelerators, telescopes, and other large scientific experiments. An important component of all EPICS-based control systems is a collection of input/output controllers (IOCs). An IOC has three primary components: (1) a real-time database; (2) channel access, which provides network access to the database; and (3) device/driver support for interfacing to equipment. This paper describes some projects related to providing device/driver support on non-vxWorks systems. In order to support IOCs on platforms other than vxWorks, operating-system-independent (OSI) application program interfaces (APIs) were defined for threads, semaphores, timers, etc. Providing support for a new platform consists of providing an operating-system-dependent implementation of the OSI APIs.

  10. Measurement and analysis of operating system fault tolerance

    Science.gov (United States)

    Lee, I.; Tang, D.; Iyer, R. K.

    1992-01-01

    This paper demonstrates a methodology to model and evaluate the fault tolerance characteristics of operational software. The methodology is illustrated through case studies on three different operating systems: the Tandem GUARDIAN fault-tolerant system, the VAX/VMS distributed system, and the IBM/MVS system. Measurements are made on these systems for substantial periods to collect software error and recovery data. In addition to investigating basic dependability characteristics such as major software problems and error distributions, we develop two levels of models to describe error and recovery processes inside an operating system and on multiple instances of an operating system running in a distributed environment. Based on the models, reward analysis is conducted to evaluate the loss of service due to software errors and the effect of the fault-tolerance techniques implemented in the systems. Software error correlation in multicomputer systems is also investigated.

  11. Systematising "System": One Reviewer's Analysis of the Review Process

    Science.gov (United States)

    Coniam, David

    2011-01-01

    This paper describes one reviewer's experience of reviewing for the journal "System" over an eight-year period, 2003-2011. The paper reports on the reviews produced by the single reviewer, which have been compiled into a specific purpose--an "occluded"--corpus (Swales, 1996) of 122 reviews, comprising 93,000 words. The paper first describes the…

  12. A Framework for Adaptable Operating and Runtime Systems

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, Thomas [Indiana Univ., Bloomington, IN (United States)

    2014-03-04

    The emergence of new classes of HPC systems where performance improvement is enabled by Moore’s Law for technology is manifest through multi-core-based architectures including specialized GPU structures. Operating systems were originally designed for control of uniprocessor systems. By the 1980s multiprogramming, virtual memory, and network interconnection were integral services incorporated as part of most modern computers. HPC operating systems were primarily derivatives of the Unix model with Linux dominating the Top-500 list. The use of Linux for commodity clusters was first pioneered by the NASA Beowulf Project. However, the rapid increase in number of cores to achieve performance gain through technology advances has exposed the limitations of POSIX general-purpose operating systems in scaling and efficiency. This project was undertaken through the leadership of Sandia National Laboratories and in partnership of the University of New Mexico to investigate the alternative of composable lightweight kernels on scalable HPC architectures to achieve superior performance for a wide range of applications. The use of composable operating systems is intended to provide a minimalist set of services specifically required by a given application to preclude overheads and operational uncertainties (“OS noise”) that have been demonstrated to degrade efficiency and operational consistency. This project was undertaken as an exploration to investigate possible strategies and methods for composable lightweight kernel operating systems towards support for extreme scale systems.

  13. Operator support systems in nuclear power plants. Proceedings of a specialists meeting held in Moscow, Russian Federation, 17-21 May 1993

    International Nuclear Information System (INIS)

    1994-09-01

    The 60 participants, representing 17 Member States, reviewed recent developments and discussed directions for future efforts in the area of computerized systems for operator support in nuclear power plants. During the meeting 31 papers were presented covering the wide spectrum of technical and scientific subjects including recent experience and benefits with operator support systems (OSS), design and implementation of OSSs, human aspects of introducing OSSs, qualification verification, validation and licensing, and international co-operation. Refs, figs and tabs

  14. Access control system operation

    International Nuclear Information System (INIS)

    Barnes, L.D.

    1981-06-01

    An automated method for the control and monitoring of personnel movement throughout the site was developed under contract to the Department of Energy by Allied-General Nuclear Services (AGNS) at the Barnwell Nuclear Fuel Plant (BNFP). These automated features provide strict enforcement of personnel access policy without routine patrol officer involvement. Identification methods include identification by employee ID number, identification by voice verification and identification by physical security officer verification. The ability to grant each level of access authority is distributed over the organization to prevent any single individual at any level in the organization from being capable of issuing an authorization for entry into sensitive areas. Each access event is recorded. As access events occur, the inventory of both the entered and the exited control area is updated so that a current inventory is always available for display. The system has been operated since 1979 in a development mode and many revisions have been implemented in hardware and software as areas were added to the system. Recent changes have involved the installation of backup systems and other features required to achieve a high reliability. The access control system and recent operating experience are described

  15. The transportation operations system: A description

    International Nuclear Information System (INIS)

    Best, R.E.; Danese, F.L.; Dixon, L.D.; Peterson, R.W.; Pope, R.B.

    1990-01-01

    This paper presents a description of the system for transporting radioactive waste that may be deployed to accomplish the assigned system mission, which includes accepting spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from waste generator sites and transporting them to the FWMS destination facilities. The system description presented here contains, in part, irradiated fuel and waste casks, ancillary equipments, truck, rail, and barge transporters, cask and vehicle traffic management organizations, maintenance facilities, and other operations elements. The description is for a fully implemented system, which is not expected to be achieved, however, until several years after initial operations. 6 figs

  16. Discussion of Minos Mine operating system

    Energy Technology Data Exchange (ETDEWEB)

    Pan, B.

    1991-10-01

    The MINOS (mine operating system), which is used in the majority of British collieries, provides central control at the surface for the machinery and environmental equipment distributed throughout the mine. Installed equipment, including face machinery, conveyors, pumps, fans and sensors are connected to local outstations which all communicate with the control system via a single run of signal cable. The article discusses the system particularly its use in the Automated Control System of Underground Mining Locomotives (ACSUML). The discussion includes the use of MINOS to improve wagon identification, the operating principle of ACSUML and the possibilities of a driverless locomotive. 2 figs.

  17. Comment Response on the Final Report: Peer Review of the Total System Performance Assessment-Viability Assessment (TSPA-VA)

    International Nuclear Information System (INIS)

    Pendleton, M. W.

    1999-01-01

    The Management and Operating Contractor established a Performance Assessment Peer Review Panel (hereinafter ''the Panel'') at the request of the U.S. Department of Energy Yucca Mountain Site Characterization Office. The objectives of the peer review were to provide: (1) A formal, independent evaluation and critique of Viability Assessment of a Repository at Yucca Mountain: Total System Performance Assessment, Volume 3 (DOE 1998a; hereinafter ''Total System Performance Assessment-Viability Assessment'') that was conducted in support of the Viability Assessment of a Repository at Yucca Mountain (DOE 1998b). (2) Suggestions for improvements as the U.S. Department of Energy prepares to develop the documentation for a Total System Performance Assessment to support a potential License Application. The Panel conducted a phased review over a two-year period to observe the development and, ultimately, to review the Total System Performance Assessment-Viability Assessment (DOE 1998a). During the development of the Total System Performance Assessment-Viability Assessment (DOE 1998a), the Panel submitted three Interim Reports (Whipple et al., 1997a, 1997b, and 1998) to the Management and Operating Contractor with recommendations and comments on the process models, model abstractions, and draft documentation for the Total System Performance Assessment-Viability Assessment (DOE 1998a). The Panel's Final Report Total System Performance Assessment Peer Review Panel (Whipple et al. 1999; hereinafter ''Final Report'') on the Total System Performance Assessment-Viability Assessment (DOE 1998a) is based primarily on the completed Total System Performance Assessment-Viability Assessment (DOE 1998a), the Total System Performance Assessment-Viability Assessment (TSPA-VA) Analyses Technical Basis Document (CRWMS M and O 1998), and the cited references. The Final Report (Whipple et al. 1999) includes the major points from the three Interim Reports (Whipple et al. 1997a, 1997b, and 1998

  18. Automated Operations Development for Advanced Exploration Systems

    Science.gov (United States)

    Haddock, Angie T.; Stetson, Howard

    2012-01-01

    Automated space operations command and control software development and its implementation must be an integral part of the vehicle design effort. The software design must encompass autonomous fault detection, isolation, recovery capabilities and also provide "single button" intelligent functions for the crew. Development, operations and safety approval experience with the Timeliner system onboard the International Space Station (ISS), which provided autonomous monitoring with response and single command functionality of payload systems, can be built upon for future automated operations as the ISS Payload effort was the first and only autonomous command and control system to be in continuous execution (6 years), 24 hours a day, 7 days a week within a crewed spacecraft environment. Utilizing proven capabilities from the ISS Higher Active Logic (HAL) System, along with the execution component design from within the HAL 9000 Space Operating System, this design paper will detail the initial HAL System software architecture and interfaces as applied to NASA's Habitat Demonstration Unit (HDU) in support of the Advanced Exploration Systems, Autonomous Mission Operations project. The development and implementation of integrated simulators within this development effort will also be detailed and is the first step in verifying the HAL 9000 Integrated Test-Bed Component [2] designs effectiveness. This design paper will conclude with a summary of the current development status and future development goals as it pertains to automated command and control for the HDU.

  19. PEP-II RF System Operation and Performance

    International Nuclear Information System (INIS)

    McIntosh, P.

    2005-01-01

    The Low Energy Ring (LER) and High Energy Ring (HER) RF systems have operated now on PEP-II since July 1998 and have assisted in breaking all design luminosity records back in June 2001. Luminosity on PEP-II has steadily increased since then as a consequence of larger e+ and e- beam currents being accumulated. This has meant that the RF systems have inevitably been driven harder, not only to achieve these higher stored beam currents, but also to reliably keep the beams circulating whilst at the same time minimizing the number of aborts due to RF system faults. This paper details the current PEP-II RF system configurations for both rings, as well as future upgrade plans spanning the next 3-5 years. Limitations of the current RF system configurations are presented, highlighting improvement projects which will target specific areas within the RF systems to ensure that adequate operating overheads are maintained and reliable operation is assured. The Low Energy Ring (LER) and High Energy Ring (HER) RF systems have operated now on PEP-II since July 1998 and have assisted in breaking all design luminosity records back in June 2001. Luminosity on PEP-II has steadily increased since then as a consequence of larger e+ and e- beam currents being accumulated. This has meant that the RF systems have inevitably been driven harder, not only to achieve these higher stored beam currents, but also to reliably keep the beams circulating whilst at the same time minimizing the number of aborts due to RF system faults. This paper details the current PEP-II RF system configurations for both rings, as well as future upgrade plans spanning the next 3-5 years. Limitations of the current RF system configurations are presented, highlighting improvement projects which will target specific areas within the RF systems to ensure that adequate operating overheads are maintained and reliable operation is assured

  20. The effect of the introduction of a nationwide DUR system where local DUR systems are operating--The Korean experience.

    Science.gov (United States)

    Yang, Ju-Hyun; Kim, Mira; Park, Young-Taek; Lee, Eui-Kyung; Jung, Chai Young; Kim, Sukil

    2015-11-01

    Outpatient clinics in Korea usually have local DUR (drug utilisation review) systems, which are integrated with EMRs or health insurance claims submission systems. Whenever, the government announces a list of drug contraindications, each local DUR system loads the list and applies it in practice. In December 2010, a nationwide DUR system was introduced. This study is to investigate the impact of the nationwide DUR system on prescribing practices where local DUR systems are already operating. Between January 2009 and December 2012 the monthly number of drugs per prescription was retrieved from the health insurance claims data warehouse at the Health Insurance Review and Assessment (HIRA). The monthly proportions of 3 DDI (drug-drug interaction) pairs, 6 drug-age contraindications, and 3 drug-pregnancy contraindications from January 2007 to December 2012, at the outpatient clinic level, were also retrieved. An interrupted time series analysis was used for controlling government announcements of drug contraindications. There was no difference in the number of drugs per prescription before and after the introduction of the nationwide DUR system. Most proportions of the 3 DDI pairs, 6 drug-age contraindications, and 3 drug-pregnancy contraindications, were significantly reduced following the government announcement of drug contraindications in the short term and/or long term. The number of drugs per prescription was not related to the nationwide DUR introduction in places where local DUR systems are operating. The introduction of duplicate guidelines, in locations where the guidelines were already well followed, is considered to be the main reason for this. Furthermore, the Doctor's ignorance of alerts, and their continued substitution of regulated drugs, for non-regulated drugs, likely played a role in nullifying the effectiveness of the nationwide DUR system. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  1. UNIVERSAL INTERFACE TO MULTIPLE OPERATIONS SYSTEMS

    DEFF Research Database (Denmark)

    Sonnenwald, Diane H.

    1986-01-01

    Alternative ways to provide access to operations systems that maintain, test, and configure complex telephone networks are being explored. It is suggested that a universal interface that provides simultaneous access to multiple operations systems that execute in different hardware and software...... environments, can be provided by an architecture that is based on the separation of presentation issues from application issues and on a modular interface management system that consists of a virtual user interface, physical user interface, and interface agent. The interface functionality that is needed...

  2. Modeling Control Situations in Power System Operations

    DEFF Research Database (Denmark)

    Saleem, Arshad; Lind, Morten; Singh, Sri Niwas

    2010-01-01

    for intelligent operation and control must represent system features, so that information from measurements can be related to possible system states and to control actions. These general modeling requirements are well understood, but it is, in general, difficult to translate them into a model because of the lack...... of explicit principles for model construction. This paper presents a work on using explicit means-ends model based reasoning about complex control situations which results in maintaining consistent perspectives and selecting appropriate control action for goal driven agents. An example of power system......Increased interconnection and loading of the power system along with deregulation has brought new challenges for electric power system operation, control and automation. Traditional power system models used in intelligent operation and control are highly dependent on the task purpose. Thus, a model...

  3. Expert system. Based advisory system for the operator's mental activities support

    International Nuclear Information System (INIS)

    Gieci, A.; Macko, J.; Mosny, J.

    2000-01-01

    The operator's mental activity is the most important part of his work. A processing of a large amount of the information by the operator is possible only if he/she possesses appropriate cognitive skills. To facilitate the novice's acquisition of the experienced operator's cognitive skills of the decision-making process a special type of the expert system was developed. The cognitive engineering's models and problem-solving methodology constitutes the basis of this expert system. The article gives an account of the prototype of the mentioned expert system developed to aid the whole mental activity of the nuclear power plant operator during his decision-making process. (author)

  4. OSART Guidelines. 2015 Edition. Reference Report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2016-01-01

    The IAEA works to provide a global nuclear safety and security framework for the protection of people and the environment from the effects of ionizing radiation, the minimization of the likelihood of accidents that could endanger life and property, and effective mitigation of the effects of any such events, should they occur. The strategic approach to achieving such a framework involves continual improvement in four areas: national and international safety infrastructures; the establishment and global acceptance of IAEA safety standards; an integrated approach to the provision for the application of the safety standards; and a global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. Conservative design, careful manufacture and sound construction are all prerequisites for the safe operation of nuclear power plants. However, the safety of the plant also depends ultimately on: sound management, policies, procedures, processes and practices; the capability and reliability of commissioning and operating personnel; comprehensive instructions; sound accident management and emergency preparedness; and adequate resources. Finally, a positive attitude and conscientiousness on the part of all staff in discharging their responsibilities is important to safety. The OSART programme is based on the safety standards applicable to nuclear power plants. IAEA safety standards reflect the consensus of Member States on nuclear safety matters. The reports of the International Nuclear Safety Group identify important current nuclear safety issues and also serve as references during an OSART review. The publication OSART Guidelines provides overall guidance on the conduct of OSART

  5. Development of a dynamic operation permission system to support operations in an anomalous situation of PWR plants

    International Nuclear Information System (INIS)

    Gofuku, Akio; Nishio, Takuya; Ohi, Tadashi; Ito, Koji

    2005-01-01

    This paper describes a proto-type dynamic operation permission system to avoid commission errors of operators. The system lies between CRT-based operation panels and plant control systems and checks an operation by operators if it follows typical operation procedure described in operation manuals and it has suitable effects on plant condition. The applicability of the proto-type system is demonstrated through the application to the recovery operations of a steam generator tube rupture accident of a three-loop pressurized water reactor plant

  6. Case review analysis of operating room decisions to cancel surgery.

    Science.gov (United States)

    Chang, Ju-Hsin; Chen, Ke-Wei; Chen, Kuen-Bao; Poon, Kin-Shing; Liu, Shih-Kai

    2014-07-23

    Cancellation of surgery close to scheduled time causes a waste of healthcare resources. The current study analyzes surgery cancellations occurring after the patient has been prepared for the operating room, in order to see whether improvements in the surgery planning process may reduce the number of cancellations. In a retrospective chart review of operating room surgery cancellations during the period from 2006 to 2011, cancellations were divided into the following categories: inadequate NPO; medical; surgical; system; airway; incomplete evaluation. The relative use of these reasons in relation to patient age and surgical department was then evaluated. Forty-one percent of cancellations were for other than medical reasons. Among these, 17.7% were due to incomplete evaluation, and 8.2% were due to family issues. Sixty seven percent of cancelled cases eventually received surgery. The relative use of individual reasons for cancellation varied with patient age and surgical department. The difference between cancellations before and after anesthesia was dependent on the causes of cancellation, but not age, sex, ASA status, or follow-up procedures required. Almost half of the cancellations were not due to medical reasons, and these cancellations could be reduced by better administrative and surgical planning and better communication with the patient and/or his family.

  7. [Controlling systems for operating room managers].

    Science.gov (United States)

    Schüpfer, G; Bauer, M; Scherzinger, B; Schleppers, A

    2005-08-01

    Management means developing, shaping and controlling of complex, productive and social systems. Therefore, operating room managers also need to develop basic skills in financial and managerial accounting as a basis for operative and strategic controlling which is an essential part of their work. A good measurement system should include financial and strategic concepts for market position, innovation performance, productivity, attractiveness, liquidity/cash flow and profitability. Since hospitals need to implement a strategy to reach their business objectives, the performance measurement system has to be individually adapted to the strategy of the hospital. In this respect the navigation system developed by Gälweiler is compared to the "balanced score card" system of Kaplan and Norton.

  8. Towards Designing Graceful Degradation into Trajectory Based Operations: A Human-Machine System Integration Approach

    Science.gov (United States)

    Edwards, Tamsyn; Lee, Paul

    2017-01-01

    One of the most fundamental changes to the air traffic management system in NextGen is the concept of trajectory based operations (TBO). With the introduction of such change, system safety and resilience is a critical concern, in particular, the ability of systems to gracefully degrade. In order to design graceful degradation into a TBO envrionment, knowledge of the potential causes of degradation, and appropriate solutions, is required. In addition, previous research has predominantly explored the technological contribution to graceful degradation, frequently neglecting to consider the role of the human operator, specifically, air traffic controllers (ATCOs). This is out of step with real-world operations, and potentially limits an ecologically valid understanding of achieving graceful degradation in an air traffic control (ATC) environment. The following literature review aims to identify and summarize the literature to date on the potential causes of degradation in ATC and the solutions that may be applied within a TBO context, with a specific focus on the contribution of the air traffic controller. A framework of graceful degradation, developed from the literature, is presented. It is argued that in order to achieve graceful degradation within TBO, a human-system integration approach must be applied.

  9. Pyrolaser Operating System

    Science.gov (United States)

    Roberts, Floyd E., III

    1994-01-01

    Software provides for control and acquisition of data from optical pyrometer. There are six individual programs in PYROLASER package. Provides quick and easy way to set up, control, and program standard Pyrolaser. Temperature and emisivity measurements either collected as if Pyrolaser in manual operating mode or displayed on real-time strip charts and stored in standard spreadsheet format for posttest analysis. Shell supplied to allow macros, which are test-specific, added to system easily. Written using Labview software for use on Macintosh-series computers running System 6.0.3 or later, Sun Sparc-series computers running Open-Windows 3.0 or MIT's X Window System (X11R4 or X11R5), and IBM PC or compatible computers running Microsoft Windows 3.1 or later.

  10. Review of relevant studies of isolated systems[Integration of wind energy

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, L.H.; Lundsager, P.

    2000-12-01

    The report presents the results of a review of studies relating to integration of wind energy in isolated power supply systems, based on a systematic literature survey. The purpose of the study is to develop a methodology consisting of a set of guidelines for wind energy projects in isolated energy systems and a set of tools and models that are operational on an engineering level. The review is based on a literature search in the ETDE Energy Database with a main search covering the period 7/88 to 6/97 and supplemented by partial update periods. A few newer references have been included in the review, most notably the IEC/PAS 62111 specification. The amount of wind energy literature related to the subject is excessively large, and a complete review in which every relevant abstract is identified and examined is not feasible within the framework of this (or probably any other) study. The review results have been organised according to the following keywords: methods & guides, economics, concept of application, system solutions, case studies, financial programmes, dedicated software tools. None of the found references presents methods or tools that contradict the philosophy of Risoe's methodology as it is described in the report. It is therefore concluded that Risoe's methodology makes a good platform for further development. (au)

  11. HFBR restart activity A2.6: Review of FSAR and 60 MW addendum to assure consistency of operation at 40 MW

    International Nuclear Information System (INIS)

    Rao, D.V.; Ross, S.B.; Darby, J.L.; Clark, R.A.

    1990-01-01

    The purpose of this task (HFBR Restart Activity A2.6) is to perform a review of the design basis accident (DBA) analyses sections of the 1964 HFBR-Final Safety Analysis Report; Volumes I and II, and the 1982 Addendum to the HFBR-FSAR for 60 MW operation to assure that operation at 40 MW will be consistent with these analyses. Additional documents utilized in the review included the Level 1 PRA for HFBR, HFBR-PDMs and HFBR-OPMs. The review indicates that the 1964 FSAR-DBA analysis in incomplete in the sense that it did not analyze some of the important initiators for 1-loop operation that include: Accidental throttling of primary flow control valves; seizure of primary pump; loss of secondary pump; accidental throttling of secondary flow control valves; rupture of secondary piping. The first three initiators were later studied in the 1982 addendum. The other two initiators have not been examined to-date for 1-loop operation. It is recommended that the impact of these initiators be assessed prior to the restart, if 1-loop operation is chosen for the restart. The review demonstrated that at 40 MW operation there are only a few accident initiators that will culminate in core damage (fuel melting and /or cladding failure) regardless of the availability of mitigating systems. For 1-loop Operation these accidents include: Fuel channel blockage, primary pump seizure, and large-large LOCA (a LOCA with effective break diameter > 2.81 in. is referred to as a large-large LOCA in this document as well as in PRA). Although all these accidents listed above could lead to core damage for 1-loop operation as well, the probability is expected be very low

  12. Operating health analysis of electric power systems

    Science.gov (United States)

    Fotuhi-Firuzabad, Mahmud

    The required level of operating reserve to be maintained by an electric power system can be determined using both deterministic and probabilistic techniques. Despite the obvious disadvantages of deterministic approaches there is still considerable reluctance to apply probabilistic techniques due to the difficulty of interpreting a single numerical risk index and the lack of sufficient information provided by a single index. A practical way to overcome difficulties is to embed deterministic considerations in the probabilistic indices in order to monitor the system well-being. The system well-being can be designated as healthy, marginal and at risk. The concept of system well-being is examined and extended in this thesis to cover the overall area of operating reserve assessment. Operating reserve evaluation involves the two distinctly different aspects of unit commitment and the dispatch of the committed units. Unit commitment health analysis involves the determination of which unit should be committed to satisfy the operating criteria. The concepts developed for unit commitment health, margin and risk are extended in this thesis to evaluate the response well-being of a generating system. A procedure is presented to determine the optimum dispatch of the committed units to satisfy the response criteria. The impact on the response wellbeing being of variations in the margin time, required regulating margin and load forecast uncertainty are illustrated. The effects on the response well-being of rapid start units, interruptible loads and postponable outages are also illustrated. System well-being is, in general, greatly improved by interconnection with other power systems. The well-being concepts are extended to evaluate the spinning reserve requirements in interconnected systems. The interconnected system unit commitment problem is decomposed into two subproblems in which unit scheduling is performed in each isolated system followed by interconnected system evaluation

  13. Real-time Testing of Operating Systems on Raspberry Pi

    OpenAIRE

    Murstad, Amund

    2016-01-01

    A subset of operating systems are called ``real time'' operating systems. While a general operating system like Windows or OSX can make no guarantee when a process gets to run, a real time one has the ability to do so. They are used for systems where the quality of the results from the operating system is not only defined by their correctness, but also by when they arrive. These kinds of systems are called Real-time Systems and can be divided into soft, hard and firm. If a deadline is missed ...

  14. Advanced smartgrids for distribution system operators

    CERN Document Server

    Boillot, Marc

    2014-01-01

    The dynamic of the Energy Transition is engaged in many region of the World. This is a real challenge for electric systems and a paradigm shift for existing distribution networks. With the help of "advanced" smart technologies, the Distribution System Operators will have a central role to integrate massively renewable generation, electric vehicle and demand response programs. Many projects are on-going to develop and assess advanced smart grids solutions, with already some lessons learnt. In the end, the Smart Grid is a mean for Distribution System Operators to ensure the quality and the secu

  15. Development of operator thinking model and its application to nuclear reactor plant operation system

    International Nuclear Information System (INIS)

    Miki, Tetsushi; Endou, Akira; Himeno, Yoshiaki

    1992-01-01

    At first, this paper presents the developing method of an operator thinking model and the outline of the developed model. In next, it describes the nuclear reactor plant operation system which has been developed based on this model. Finally, it has been confirmed that the method described in this paper is very effective in order to construct expert systems which replace the reactor operator's role with AI (artificial intelligence) systems. (author)

  16. Operation of river systems. The Otra river

    International Nuclear Information System (INIS)

    Harby, A.; Vaskinn, K.A.; Wathne, M.; Heggenes, J.; Saltveit, S.J.

    1993-12-01

    The purpose of the project described in this report was to prepare an operative tool for making decisions about the operation of the power system on the river Otra (Norway) with regard to how this operation might affect the various users of the river system. Above all this affects fish, outdoor life and esthetic values. The connection between water quality and volume of discharge has been examined in a sub project. How suitable parts of the river are as habitats for trout has been simulated on a computer. From field investigation it is concluded that near the Steinfoss power station the physical conditions for trout depend on the operation of the river system. Outdoor life is not much affected downstream Vikeland. 11 refs., 22 figs., 2 tabs

  17. Centralised process control of the metallurgical operation at Roessing, South West Africa/Namibia

    International Nuclear Information System (INIS)

    Thomas, R.; Erlank, B.

    1987-01-01

    A Honeywell TDC 2000 central process control system was installed at Roessing in 1984. The system controls the metallurgical operations from crushing to the finished product of uranium oxide and manufacture of sulphuric acid. The operation was previously controlled from nine separate local control rooms. The paper briefly reviews the design and commissioning of the control system on an operating plant and discusses the impact on manpower organisation and training needs. Development of the process control system during its first two years of operation is reviewed and a summary is given of the current status of computer control at Roessing. The impact of the new system on overall plant operation and performance efficiency is also briefly described. In conclusion, future developments of computer control and overall optimisation of metallurgical operations are reviewed

  18. Testing Infrastructure for Operating System Kernel Development

    DEFF Research Database (Denmark)

    Walter, Maxwell; Karlsson, Sven

    2014-01-01

    Testing is an important part of system development, and to test effectively we require knowledge of the internal state of the system under test. Testing an operating system kernel is a challenge as it is the operating system that typically provides access to this internal state information. Multi......-core kernels pose an even greater challenge due to concurrency and their shared kernel state. In this paper, we present a testing framework that addresses these challenges by running the operating system in a virtual machine, and using virtual machine introspection to both communicate with the kernel...... and obtain information about the system. We have also developed an in-kernel testing API that we can use to develop a suite of unit tests in the kernel. We are using our framework for for the development of our own multi-core research kernel....

  19. 4th Evian Workshop on LHC beam operation

    CERN Document Server

    Goddard, B; Dubourg, S

    2013-01-01

    The principle aims of the workshop are to: review and capture 2012 LHC beam operations experience; review system performance; examine the foreseen challenges and limitations of post long shutdown operations; have a look at possible running scenarios in the post long shutdown era.

  20. Operative Versus Non-operative Treatment of Grade III Acromioclavicular Joint Dislocations and the Use of SurgiLig: a Retrospective Review.

    Science.gov (United States)

    Younis, Fizan; Ajwani, Sanil; Bibi, Asia; Riley, Eleanor; Hughes, Peter J

    2017-12-30

    Acromioclavicular joint dislocations are common shoulder girdle injuries. The treatment of grade III acromioclavicular joint dislocations is controversial. Furthermore, the literature on the use of the Sur-giligTM synthetic ligament for reconstruction of dislocations is sparse. This retrospective review aimed to establish whether operative treatment was superior to non-operative treatment in grade III acromioclavicular joint dislocations treated at our institute over a 5-year period. We also reviewed the effectiveness of reconstruction with SurgiligTM after acute and chronic dislocations across all grades of acromioclavicular joint dislocations. Twenty-five patients completed full follow-up with grade III dislocations. The mean follow-up in the operated group was 3.56 years and in the non-operated group this was 3.29 years. The mean Oxford Shoul-der Score (OSS) in the operated group was 39.8, whereas the mean OSS in the non-operated group was 45.9 (p=0.01). The mean pain score in the operated group was 2.2, and in the non-operated group this was 1.6. The mean satisfaction score in the operated group was 8.2 and that in the non-operated group was 7.8. There was no statistically significant difference in pain or satisfaction scores. In respect to the cohort treated with Surg-iligTM synthetic ligament, 22 patients across all grades of dislocations had this procedure performed. The mean post-operative Oxford Shoulder Score (OSS) was 40. 1. Non-operative treatment is not inferior to operative treatment for grade III acromioclavicular joint dislocations. The data from this study demonstrat-ed that the non-operated group had superior Ox-ford Shoul-der Scores that were statistically significant. 2. Additionally, the use of the SurgiligTM ligament appears to be effective in treating both chronic and acute acromioclavicular joint dislocations.

  1. IAEA-led Operational Safety Team Reviews Dukovany Nuclear Power Plant, Czech Republic

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has commended the Dukovany Nuclear Power Plant (NPP) in the Czech Republic for its safety practices and has also made a series of recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of the Czech Republic to conduct an Operational Safety Review (OSART) of Dukovany NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 6 to 23 June 2011. The team was made up of experts from Armenia, Germany, Hungary, Romania, Slovenia, Sweden, the UK and the USA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at Dukovany conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; and Emergency Planning and Preparedness. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: The plant uses an integrated approach to recruit, select, psychologically assess and train new employees. This approach has resulted in consistently high success rates for licensed operator examinations and the identification of potential candidates for various plant departments; The performance

  2. Reexamining Operating System Support for Database Management

    OpenAIRE

    Vasil, Tim

    2003-01-01

    In 1981, Michael Stonebraker [21] observed that database management systems written for commodity operating systems could not effectively take advantage of key operating system services, such as buffer pool management and process scheduling, due to expensive overhead and lack of customizability. The “not quite right” fit between these kernel services and the demands of database systems forced database designers to work around such limitations or re-implement some kernel functionality in user ...

  3. AECB staff review of Bruce NGS 'A' operation for the year 1988

    International Nuclear Information System (INIS)

    1989-05-01

    AECB project staff believes that overall performance of the station in 1988 was generally satisfactory and better than in 1987. However, this assessment is not supported by some of the key performance indicators, although the indicators in areas where AECB staff had specific concerns do support it. For example, the percentage of reported significant events attributable to human error, the number of operating memos beyond the review date, scheduled emergency drills completed, the number of completed reactor trips all show a significant improvement over the 1987 value. In addition, AECB staff has been encouraged by the licensee's implementation of effective review processes for operator and maintenance call-ups, routines and deficiencies, and the establishment of supervisor inspection tours and operator rounds programs. Nevertheless, it is the opinion of AECB staff that to achieve standards of operation which would be considered fully satisfactory, the backlog of maintenance work must be reduced, the quality of work performed in the plant improved, and assurance provided that the required quality standards are being consistently achieved and maintained

  4. PROSPER guidelines: Guidelines for peer review and for plant self-assessment of operational experience feedback process

    International Nuclear Information System (INIS)

    2003-01-01

    Effective use of operational performance information is an important element in any plant operator's arrangements for enhancing the operational safety of a nuclear power plant (NPP). This has been recognized in the IAEA Safety Fundamental, The Safety of Nuclear Installations (Safety Series No. 110). Under the technical aspects of safety, one of the principles of operation and maintenance is that the operating organization and the regulatory body shall establish complementary programmes to analyse operating experience to ensure that lessons are learned and acted upon. Such experience shall be shared with relevant national and international bodies. The Convention on Nuclear Safety, which entered into force in July 1996, also recognized the importance of operational experience feedback as a tool of high importance for the safety of nuclear plant operation and its further enhancement. It follows that the arrangements and results achieved under the operation experience feedback process in Member States will be covered by the national report under the Convention and will be subject to periodical review. These principles are further expanded in the IAEA Safety Standards Safety of Nuclear Power Plants: Operation (Safety Standard Series No. NS-R-2, year 2000) under the Feedback of The IAEA-led Peer Review of the effectiveness of the Operational Safety Performance Experience Review process (PROSPER) and associated guidelines have been developed to provide advice and assistance to utilities or individual power plants to strengthen and enhance the effectiveness of operational experience programmes in achieving these fundamental objectives. The objectives of the former IAEA Assessment of Significant Safety Events Team (ASSET) service have been expanded to include an evaluation of the effective use of all operating performance information available to the plant (e.g. external operating experience, internal low-level and near miss event reports and other relevant operating

  5. Operation of staged membrane oxidation reactor systems

    Science.gov (United States)

    Repasky, John Michael

    2012-10-16

    A method of operating a multi-stage ion transport membrane oxidation system. The method comprises providing a multi-stage ion transport membrane oxidation system with at least a first membrane oxidation stage and a second membrane oxidation stage, operating the ion transport membrane oxidation system at operating conditions including a characteristic temperature of the first membrane oxidation stage and a characteristic temperature of the second membrane oxidation stage; and controlling the production capacity and/or the product quality by changing the characteristic temperature of the first membrane oxidation stage and/or changing the characteristic temperature of the second membrane oxidation stage.

  6. IGENPRO knowledge-based operator support system

    International Nuclear Information System (INIS)

    Morman, J. A.

    1998-01-01

    Research and development is being performed on the knowledge-based IGENPRO operator support package for plant transient diagnostics and management to provide operator assistance during off-normal plant transient conditions. A generic thermal-hydraulic (T-H) first-principles approach is being implemented using automated reasoning, artificial neural networks and fuzzy logic to produce a generic T-H system-independent/plant-independent package. The IGENPRO package has a modular structure composed of three modules: the transient trend analysis module PROTREN, the process diagnostics module PRODIAG and the process management module PROMANA. Cooperative research and development work has focused on the PRODIAG diagnostic module of the IGENPRO package and the operator training matrix of transients used at the Braidwood Pressurized Water Reactor station. Promising simulator testing results with PRODIAG have been obtained for the Braidwood Chemical and Volume Control System (CVCS), and the Component Cooling Water System. Initial CVCS test results have also been obtained for the PROTREN module. The PROMANA effort also involves the CVCS. Future work will be focused on the long-term, slow and mild degradation transients where diagnoses of incipient T-H component failure prior to forced outage events is required. This will enhance the capability of the IGENPRO system as a predictive maintenance tool for plant staff and operator support

  7. Control of TFTR during DT operations

    International Nuclear Information System (INIS)

    Pearson, G.G.; Alling, P.D.; Blanchard, W.; Camp, R.A.; Hawryluk, R.J.; Hosea, J.C.; Nagy, A.

    1995-01-01

    Since beginning routine D-T operations in December, 1993, there have been more than 500 DT plasmas and approximately 600,000 Ci of tritium processed through TFTR culminating in greater than 10 MW of fusion power produced in a single discharge in November, 1994. These performance levels were achieved while maintaining the highest levels of personnel and equipment safety. Prior to D-T operations, a Chain of Command structure and a TFTR Shift Supervisor (TFTRSS) position were developed for centralized control of the facility with all subsystems reporting to this position. A comprehensive surveillance system was incorporated such that the TFTR SS could easily review the operational readiness of subsystems for D-T operations. A TFTR SS Station was constructed to facilitate monitoring and control of TFTR. This station includes a camera system, FAX, a networked personal computer, a computerized tritium monitor and control system and a hardware interlock system. In the transition from D-D to D-T operations, TFTR's procedures were reviewed/revised and a number of additional procedures developed for control of activities at the facility. This paper details the equipment, administrative and organizational configurations used for controlling TFTR during D-T operations

  8. Operational safety performance indicator system at the Dukovany Nuclear Power Plant - Experience with indicator aggregation

    International Nuclear Information System (INIS)

    Mandula, J.

    2001-01-01

    The operational safety performance indicators serve as an important tool of performance monitoring and management at the Dukovany NPP. A software-supported system has been developed, which has included: data collection, central data storage, graphic output production and periodical report generation. Analyses of performance indicator trends together with evaluation in respect of annually updated target values and acceptance criteria are used for operational safety reviews forming an integral part of continual self-assessment process. This contribution has been focused on experience obtained during development of the operational safety assessment model using indicator aggregation. It summarises problems that had to be paid specific attention in the development process. Thanks to their solution, the model has become a synoptic monitor and a useful tool for operational safety assessment. (author)

  9. 14 CFR 25.961 - Fuel system hot weather operation.

    Science.gov (United States)

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.961 Fuel system hot weather operation. (a) The fuel system must perform satisfactorily in hot weather operation. This... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system hot weather operation. 25.961...

  10. Analysis for RSG-GAS operational characteristics of reactor cooling system

    International Nuclear Information System (INIS)

    Nurhappy, T.

    1998-01-01

    Analysis of operational characteristics of reactor cooling systems (JE01 and PA) is aimed at determining the effects of operation and maintenance patterns to the operational characteristic of the system. Analysis is carried out by virtue of the operating and maintenance data from 1987 to 1997, comprising the operating hours (duration) and data on operating failures of the systems. Results of study show that, either separately or jointly, the operating and maintenance patterns will qualitatively affect the operational characteristic of the systems

  11. Test report - caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1995-01-01

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ''Caustic Addition System Operability Test Procedure''. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  12. Program-execution in the computer operating-system VORTEX-I

    International Nuclear Information System (INIS)

    Borrmann, H.

    1976-06-01

    Comprehensive German introduction to the structure and operation of a relatively comfortable realtime operating system for process control by VORTEX-I for the V73 of the VARIAN-Company. This is a disc oriented single user system with parallel foreground and background operation. The complete organization of the system-nucleus is described (for input/output exists a separate external report). To the more experienced user of the V73 the existing facilities of interacting with the operating system (operator commands, interrupts and program calls) are exactly described regarding to their internal working. (orig./WB) [de

  13. Operator reliability assessment system (OPERAS)

    International Nuclear Information System (INIS)

    Singh, A.; Spurgin, A.J.; Martin, T.; Welsch, J.; Hallam, J.W.

    1991-01-01

    OPERAS is a personal-computer (PC) based software to collect and process simulator data on control-room operators responses during requalification training scenarios. The data collection scheme is based upon approach developed earlier during the EPRI Operator Reliability Experiments project. The software allows automated data collection from simulator, thus minimizing simulator staff time and resources to collect, maintain and process data which can be useful in monitoring, assessing and enhancing the progress of crew reliability and effectiveness. The system is designed to provide the data and output information in the form of user-friendly charts, tables and figures for use by plant staff. OPERAS prototype software has been implemented at the Diablo Canyon (PWR) and Millstone (BWR) plants and is currently being used to collect operator response data. Data collected from similator include plant-state variables such as reactor pressure and temperature, malfunction, times at which annunciators are activated, operator actions and observations of crew behavior by training staff. The data and systematic analytical results provided by the OPERAS system can contribute to increase objectivity by the utility probabilistic risk analysis (PRA) and training staff in monitoring and assessing reliability of their crews

  14. Nursing care system development for patients with cleft lip-palate and craniofacial deformities in Srinagarind Hospital: pre-post operation.

    Science.gov (United States)

    Augsornwan, Darawan; Pattangtanang, Pantamanas; Pikhunthod, Kritsana

    2011-12-01

    Cleft lip and palate are the most common craniofacial anomalies. Srinagarind Hospital has 150-200 cases each year. The operating process of care requires continuity of care involving a multidisciplinary team. When the patients go to hospital to have operation, pain, limited activity and food are very different from normal life. During pre and post operative care nurses who work continuously and closely with the patients should have knowledge, experience and ability to take excellent care of their patients and families. This can prevent complications and help their decision process, decrease parents stress and encourage better co-operation. To develop a nursing care system for patients with cleft lip-palate undergoing operation. This is an action research divided into 3 phases. Phase 1, situation review: review of nursing care process by interview, focus group, observation and nursing documents. Phase 2, nursing system management: developing guidelines, composing nursing manual, handbook for parents, VCD for patients and family and story telling. Following that announcement and implementation. Phase 3: evaluation. The authors found that guidelines, nursing manual, handbook for parents, VCD for patients and family and story telling are appropriate and have good utilization, but the pictures in handbook for parents and storytelling were not clear, too small and not attractive. Nursing manual for giving information about pre-post operative care, handbook for parents, story telling and VCD about pre-post operative care provide optimal care for patients and family with cleft lip and palate, but need to evaluate further the nursing outcome after this nursing system development.

  15. ARCHITECTURE AND RELIABILITY OF OPERATING SYSTEMS

    Directory of Open Access Journals (Sweden)

    Stanislav V. Nazarov

    2018-03-01

    Full Text Available Progress in the production technology of microprocessors significantly increased reliability and performance of the computer systems hardware. It cannot be told about the corresponding characteristics of the software and its basis – the operating system (OS. Some achievements of program engineering are more modest in this field. Both directions of OS improvement (increasing of productivity and reliability are connected with the development of effective structures of these systems. OS functional complexity leads to the multiplicity of the structure, which is further enhanced by the specialization of the operating system depending on scope of computer system (complex scientific calculations, real time, information retrieval systems, systems of the automated and automatic control, etc. The functional complexity of the OS leads to the complexity of its architecture, which is further enhanced by the specialization of the operating system, depending on the computer system application area (complex scientific calculations, real-time, information retrieval systems, automated and automatic control systems, etc.. That fact led to variety of modern OS. It is possible to estimate reliability of different OS structures only as results of long-term field experiment or simulation modeling. However it is most often unacceptable because of time and funds expenses for carrying out such research. This survey attempts to evaluate the reliability of two main OS architectures: large multi-layered modular core and a multiserver (client-server system. Represented by continuous Markov chains which are explored in the stationary mode on the basis of transition from systems of the differential equations of Kolmogorov to system of the linear algebraic equations, models of these systems are developed.

  16. Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program

    Science.gov (United States)

    Johnstone, Paul M.; Blomberg, Richard D.; Gleghorn, George J.; Krone, Norris J.; Voltz, Richard A.; Dunn, Robert F.; Donlan, Charles J.; Kauderer, Bernard M.; Brill, Yvonne C.; Englar, Kenneth G.; hide

    1996-01-01

    At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.

  17. Computerized Operator Support System – Phase II Development

    Energy Technology Data Exchange (ETDEWEB)

    Ulrich, Thomas A.; Boring, Ronald L.; Lew, Roger T.; Thomas, Kenneth D.

    2015-02-01

    A computerized operator support system (COSS) prototype for nuclear control room process control is proposed and discussed. The COSS aids operators in addressing rapid plant upsets that would otherwise result in the shutdown of the power plant and interrupt electrical power generation, representing significant costs to the owning utility. In its current stage of development the prototype demonstrates four advanced functions operators can use to more efficiently monitor and control the plant. These advanced functions consist of: (1) a synthesized and intuitive high level overview display of system components and interrelations, (2) an enthalpy-based mathematical chemical and volume control system (CVCS) model to detect and diagnose component failures, (3) recommended strategies to mitigate component failure effects and return the plant back to pre-fault status, and (4) computer-based procedures to walk the operator through the recommended mitigation actions. The COSS was demonstrated to a group of operators and their feedback was collected. The operators responded positively to the COSS capabilities and features and indicated the system would be an effective operator aid. The operators also suggested several additional features and capabilities for the next iteration of development. Future versions of the COSS prototype will include additional plant systems, flexible computer-based procedure presentation formats, and support for simultaneous component fault diagnosis and dual fault synergistic mitigation action strategies to more efficiently arrest any plant upsets.

  18. MIT January Operational Internship Experience 2011

    Science.gov (United States)

    DeLatte, Danielle; Furhmann, Adam; Habib, Manal; Joujon-Roche, Cecily; Opara, Nnaemeka; Pasterski, Sabrina Gonzalez; Powell, Christina; Wimmer, Andrew

    2011-01-01

    This slide presentation reviews the 2011 January Operational Internship experience (JOIE) program which allows students to study operational aspects of spaceflight, how design affects operations and systems engineering in practice for 3 weeks. Topics include: (1) Systems Engineering (2) NASA Organization (3) Workforce Core Values (4) Human Factors (5) Safety (6) Lean Engineering (7) NASA Now (8) Press, Media, and Outreach and (9) Future of Spaceflight.

  19. Operating system for a real-time multiprocessor propulsion system simulator

    Science.gov (United States)

    Cole, G. L.

    1984-01-01

    The success of the Real Time Multiprocessor Operating System (RTMPOS) in the development and evaluation of experimental hardware and software systems for real time interactive simulation of air breathing propulsion systems was evaluated. The Real Time Multiprocessor Operating System (RTMPOS) provides the user with a versatile, interactive means for loading, running, debugging and obtaining results from a multiprocessor based simulator. A front end processor (FEP) serves as the simulator controller and interface between the user and the simulator. These functions are facilitated by the RTMPOS which resides on the FEP. The RTMPOS acts in conjunction with the FEP's manufacturer supplied disk operating system that provides typical utilities like an assembler, linkage editor, text editor, file handling services, etc. Once a simulation is formulated, the RTMPOS provides for engineering level, run time operations such as loading, modifying and specifying computation flow of programs, simulator mode control, data handling and run time monitoring. Run time monitoring is a powerful feature of RTMPOS that allows the user to record all actions taken during a simulation session and to receive advisories from the simulator via the FEP. The RTMPOS is programmed mainly in PASCAL along with some assembly language routines. The RTMPOS software is easily modified to be applicable to hardware from different manufacturers.

  20. A Review of Flywheel Energy Storage System Technologies and Their Applications

    Directory of Open Access Journals (Sweden)

    Mustafa E. Amiryar

    2017-03-01

    Full Text Available Energy storage systems (ESS provide a means for improving the efficiency of electrical systems when there are imbalances between supply and demand. Additionally, they are a key element for improving the stability and quality of electrical networks. They add flexibility into the electrical system by mitigating the supply intermittency, recently made worse by an increased penetration of renewable generation. One energy storage technology now arousing great interest is the flywheel energy storage systems (FESS, since this technology can offer many advantages as an energy storage solution over the alternatives. Flywheels have attributes of a high cycle life, long operational life, high round-trip efficiency, high power density, low environmental impact, and can store megajoule (MJ levels of energy with no upper limit when configured in banks. This paper presents a critical review of FESS in regards to its main components and applications, an approach not captured in earlier reviews. Additionally, earlier reviews do not include the most recent literature in this fast-moving field. A description of the flywheel structure and its main components is provided, and different types of electric machines, power electronics converter topologies, and bearing systems for use in flywheel storage systems are discussed. The main applications of FESS are explained and commercially available flywheel prototypes for each application are described. The paper concludes with recommendations for future research.

  1. Review of Energy Storage System for Wind Power Integration Support

    DEFF Research Database (Denmark)

    Zhao, Haoran; Wu, Qiuwei; Hu, Shuju

    2015-01-01

    -discharging characteristics, Energy Storage System (ESS) is considered as an effective tool to enhance the flexibility and controllability not only of a specific wind farm, but also of the entire grid. This paper reviews the state of the art of the ESS technologies for wind power integration support from different aspects......With the rapid growth of wind energy development and increasing wind power penetration level, it will be a big challenge to operate the power system with high wind power penetration securely and reliably due to the inherent variability and uncertainty of wind power. With the flexible charging...

  2. Operations Monitoring Assistant System Design

    Science.gov (United States)

    1986-07-01

    Logic. Artificial Inteligence 25(1)::75-94. January.18. 41 -Nils J. Nilsson. Problem-Solving Methods In Artificli Intelligence. .klcG raw-Hill B3ook...operations monitoring assistant (OMA) system is designed that combines operations research, artificial intelligence, and human reasoning techniques and...KnowledgeCraft (from Carnegie Group), and 5.1 (from Teknowledze). These tools incorporate the best methods of applied artificial intelligence, and

  3. Conceptual Design of On-line Based Licensing Review and Assesment System of Nuclear Installations and Nuclear Materials ('PRIBEN')

    International Nuclear Information System (INIS)

    Melani, Ai; Chang, Soon Heung

    2008-01-01

    At the present Indonesia has no nuclear power plant in operation yet, although it is expected that the first nuclear power plant will be operated and commercially available in around the year of 2016 to 2017 in Muria Peninsula. There are only three research reactors, one nuclear fuel fabrication plant for research reactors, and one experimental fuel fabrication plant for nuclear power, one isotope production facility and some other research facilities. All the facility is under Nuclear Energy Regulatory Agency (BAPETEN) controlling through regulation, licensing and inspection. The organizations operation submits licensing application to BAPETEN before utilizing the facility. According to the regulation before BAPETEN give license they perform review and assessment for the utility application. Based on the review and assessment result, BAPETEN may stipulate, reject, delay or terminate the license. In anticipation of expansion of the nuclear program in Indonesia, BAPETEN should have an integrated and updated system for review and asses the licensing application. For this reason, an expert system for the review and asses the licensing application, so-called PRIBEN (Perizinan Reaktor, Instalasi dan Bahan Nuklir/Licensing of Reactor, Nuclear Installations and Nuclear Materials), is developed which runs on the online-based reality environment

  4. Computer operating systems: HEPiX news

    International Nuclear Information System (INIS)

    Silverman, Alan

    1995-01-01

    In October the North American and European Chapters of HEPiX (the HEP UNIX group established to share worldwide high energy physics experience in using the UNIX operating system - March 1994, page 18), held meetings at Fermilab and Saclay. The two-day Fermilab meeting attracted over 30 attendees from some 12 sites in the US, as well as representation from CERN. The three-day European meeting two weeks later was attended by some 70 people from 30 sites in Europe, the US and Japan. Both meetings featured some common themes such as the growth in the use of AFS (the Andrew File System) for distributed access to central filebases, and the continuing trend away from mainframes towards farms of UNIX workstations and/or servers. Other topics of interest included an update of the POSIX standards efforts, an online presentation of an experimental graphics interface, first impressions of new utility for batch job control in UNIX, the latest news on the spread of the HEPiX login scripts and a review of trends in magnetic tape technology. Detailed minutes are in preparation and will be published in the HEPNET.HEPiX news group in due course. In the meantime, the transparencies presented in many of the sessions at both conferences can be consulted via the World-Wide Web at URL http://wwwcn.cern.ch/hepix/ meetings.html

  5. Computer operating systems: HEPiX news

    Energy Technology Data Exchange (ETDEWEB)

    Silverman, Alan

    1995-01-15

    In October the North American and European Chapters of HEPiX (the HEP UNIX group established to share worldwide high energy physics experience in using the UNIX operating system - March 1994, page 18), held meetings at Fermilab and Saclay. The two-day Fermilab meeting attracted over 30 attendees from some 12 sites in the US, as well as representation from CERN. The three-day European meeting two weeks later was attended by some 70 people from 30 sites in Europe, the US and Japan. Both meetings featured some common themes such as the growth in the use of AFS (the Andrew File System) for distributed access to central filebases, and the continuing trend away from mainframes towards farms of UNIX workstations and/or servers. Other topics of interest included an update of the POSIX standards efforts, an online presentation of an experimental graphics interface, first impressions of new utility for batch job control in UNIX, the latest news on the spread of the HEPiX login scripts and a review of trends in magnetic tape technology. Detailed minutes are in preparation and will be published in the HEPNET.HEPiX news group in due course. In the meantime, the transparencies presented in many of the sessions at both conferences can be consulted via the World-Wide Web at URL http://wwwcn.cern.ch/hepix/ meetings.html.

  6. Nuclear power plant operational data compilation system

    International Nuclear Information System (INIS)

    Silberberg, S.

    1980-01-01

    Electricite de France R and D Division has set up a nuclear power plant operational data compilation system. This data bank, created through American documents allows results about plant operation and operational material behaviour to be given. At present, French units at commercial operation are taken into account. Results obtained after five years of data bank operation are given. (author)

  7. Embedded and real-time operating systems

    CERN Document Server

    Wang, K C

    2017-01-01

    This book covers the basic concepts and principles of operating systems, showing how to apply them to the design and implementation of complete operating systems for embedded and real-time systems. It includes all the foundational and background information on ARM architecture, ARM instructions and programming, toolchain for developing programs, virtual machines for software implementation and testing, program execution image, function call conventions, run-time stack usage and link C programs with assembly code. It describes the design and implementation of a complete OS for embedded systems in incremental steps, explaining the design principles and implementation techniques. For Symmetric Multiprocessing (SMP) embedded systems, the author examines the ARM MPcore processors, which include the SCU and GIC for interrupts routing and interprocessor communication and synchronization by Software Generated Interrupts (SGIs). Throughout the book, complete working sample systems demonstrate the design principles and...

  8. Alpha: A real-time decentralized operating system for mission-oriented system integration and operation

    Science.gov (United States)

    Jensen, E. Douglas

    1988-01-01

    Alpha is a new kind of operating system that is unique in two highly significant ways. First, it is decentralized transparently providing reliable resource management across physically dispersed nodes, so that distributed applications programming can be done largely as though it were centralized. And second, it provides comprehensive, high technology support for real-time system integration and operation, an application area which consists predominately of aperiodic activities having critical time constraints such as deadlines. Alpha is extremely adaptable so that it can be easily optimized for a wide range of problem-specific functionality, performance, and cost. Alpha is the first systems effort of the Archons Project, and the prototype was created at Carnegie-Mellon University directly on modified Sun multiprocessor workstation hardware. It has been demonstrated with a real-time C(sup 2) application. Continuing research is leading to a series of enhanced follow-ons to Alpha; these are portable but initially hosted on Concurrent's MASSCOMP line of multiprocessor products.

  9. 47 CFR 73.1350 - Transmission system operation.

    Science.gov (United States)

    2010-10-01

    ... interference. (e) If a broadcast station is operating in a manner that poses a threat to life or property or... 47 Telecommunication 4 2010-10-01 2010-10-01 false Transmission system operation. 73.1350 Section... RADIO BROADCAST SERVICES Rules Applicable to All Broadcast Stations § 73.1350 Transmission system...

  10. Remote operation system for container

    International Nuclear Information System (INIS)

    Nakahara, Hirotaka; Hayata, Takashi; Kajiyama, Shigeru; Takahashi, Fuminobu

    1998-01-01

    The present invention provides a remote operation system for conducting operation with operation reaction for the inside of a container filled with water (liquid), such as of inner walls and inner structural materials of a BWR type reactor. Namely, a swimming robot comprises a swimming device swimming in the liquid and an attaching/detaching device for holding/releasing the handling robot. A control device remotely operate the swimming robot and the handling robot by way of a cable. A cable processing device takes up or dispenses the cable. In addition, when the swimming robot grasps the handling robot by the attaching/detaching device, the swimming robot transmits an operation instruction sent from the control device by way of the cable to the handling robot. After the attaching/detaching device of the swimming robot releases the handling robot, the handling robot operates based on the transmitted operation instruction. It is preferable that the handling robot has an adsorptive moving device for moving itself while being adsorbed on the wall surface of the container. (I.S.)

  11. The structure of the clouds distributed operating system

    Science.gov (United States)

    Dasgupta, Partha; Leblanc, Richard J., Jr.

    1989-01-01

    A novel system architecture, based on the object model, is the central structuring concept used in the Clouds distributed operating system. This architecture makes Clouds attractive over a wide class of machines and environments. Clouds is a native operating system, designed and implemented at Georgia Tech. and runs on a set of generated purpose computers connected via a local area network. The system architecture of Clouds is composed of a system-wide global set of persistent (long-lived) virtual address spaces, called objects that contain persistent data and code. The object concept is implemented at the operating system level, thus presenting a single level storage view to the user. Lightweight treads carry computational activity through the code stored in the objects. The persistent objects and threads gives rise to a programming environment composed of shared permanent memory, dispensing with the need for hardware-derived concepts such as the file systems and message systems. Though the hardware may be distributed and may have disks and networks, the Clouds provides the applications with a logically centralized system, based on a shared, structured, single level store. The current design of Clouds uses a minimalist philosophy with respect to both the kernel and the operating system. That is, the kernel and the operating system support a bare minimum of functionality. Clouds also adheres to the concept of separation of policy and mechanism. Most low-level operating system services are implemented above the kernel and most high level services are implemented at the user level. From the measured performance of using the kernel mechanisms, we are able to demonstrate that efficient implementations are feasible for the object model on commercially available hardware. Clouds provides a rich environment for conducting research in distributed systems. Some of the topics addressed in this paper include distributed programming environments, consistency of persistent data

  12. Concept of operator support system based on cognitive simulation

    International Nuclear Information System (INIS)

    Sasou, Kunihide; Takano, Kenichi

    1999-01-01

    Hazardous technologies such chemical plants, nuclear power plants, etc. have introduced multi-layered defenses to prevent accidents. One of those defenses is experienced operators in control rooms. Once an abnormal condition occurs, they are the front line people to cope with it. Therefore, operators' quick recognition of the plant conditions and fast decision making on responses are quite important for trouble shooting. In order to help operators to deal with abnormalities in process plants, lots of efforts had been done to develop operator support systems since early 1980s (IAEA, 1993). However, the boom in developing operator support systems has slumped due to the limitations of knowledge engineering, artificial knowledge, etc (Yamamoto, 1998). The limitations had also biased the focus of the system development to abnormality detection, root cause diagnosis, etc (Hajek, Hashemi, Sharma and Chandrasekaran, 1986). Information or guidance about future plant behavior and strategies/tactics to deal with abnormal events are important and helpful for operators but researches and development of those systems made a belated start. Before developing these kinds of system, it is essential to understand how operators deal with abnormalities. CRIEPI has been conducting a project to develop a computer system that simulates behavior of operators dealing with abnormal operating conditions in a nuclear power plant. This project had two stages. In the first stage, the authors developed a prototype system that simulates behavior of a team facing abnormal events in a very simplified power plant (Sasou, Takano and Yoshimura, 1995). In the second stage, the authors applied the simulation technique developed in the first stage to construct a system to simulate a team's behavior in a nuclear power plant. This paper briefly summarizes the simulation system developed in the second stage, main mechanism for the simulation and the concept of an operator support system based on this

  13. Using Sparse Capabilities in a Distributed Operating System

    NARCIS (Netherlands)

    Tanenbaum, Andrew S.; Mullender, Sape J.; van Renesse, Robbert

    Most distributed operating systems constructed to date have lacked a unifying mechanism for naming and protection. In this paper we discuss a system, Amoeba, that uses capabilities for naming and protecting objects. In contrast to traditional, centralized operating systems, in which capabilities are

  14. Load-following operation of PWR plants

    Energy Technology Data Exchange (ETDEWEB)

    Jang, Jong Hwa; Oh, Soo Yul; Koo, Yang Hyun; Lee, Jae Han [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    The load-following operation of nuclear power plants will become inevitable due to the increased nuclear share in the total electricity generation. As a groundwork for the load-following capability of the Korean next generation PWRs, the state-of-the-art has been reviewed. The core control principles and methods are the main subject in this review as well as the impact of load-following operations on the fuel performance and on the mechanical integrity of components. To begin with, it was described what the load-following operation is and in what view point the technology should be reviewed. Afterwards the load-following method, performance and problems in domestic 900 MWe class PWRs were discussed, and domestic R and D works were summarized. Foreign technologies were also reviewed. They include Mode G and Mode X of Foratom, D and L bank method of KWU, the method using PSCEA of ABB-CE, and MSHIM of Westinghouse. The load-following related special features of Foratom`s N4 plant, KWU`s plants, ABB-CE`s Systems 80+, and Westinghouse`s AP600 were described in each technology review. The review concluded that the capability of N4 plant with Mode X is the best and the methods in System, 80+ and AP600 would require verifications for the continued and usual load-following operation. It was recommended that the load-following operation experiences in domestic PWRs under operation be required to settle down the capability for the future. In addition, a more enhanced technology is required for the Korean next generation PWR regardless what the reference plant concept is. 30 figs., 19 tabs., 75 refs. (Author).

  15. Operational advanced materials control and accountability system

    International Nuclear Information System (INIS)

    Malanify, J.J.; Bearse, R.C.; Christensen, E.L.

    1980-01-01

    An accountancy system based on the Dynamic Materials Accountability (DYMAC) System has been in operation at the Plutonium Processing Facility at the Los Alamos Scientific Laboratory (LASL) since January 1978. This system, now designated the Plutonium Facility/Los Alamos Safeguards System (PF/LASS), has enhanced nuclear material accountability and process control at the LASL facility. The nondestructive assay instruments and the central computer system are operating accurately and reliably. As anticipated, several uses of the system have developed in addition to safeguards, notably scrap control and quality control. The successes of this experiment strongly suggest that implementation of DYMAC-based systems should be attempted at other facilities. 20 refs

  16. An operator support system for research reactor operations and fault diagnosis through a connectionist framework and PSA based knowledge based systems

    International Nuclear Information System (INIS)

    Varde, P.V.; Sankar, S.; Verma, A.K.

    1998-01-01

    During reactor upset/abnormal conditions, emphasis is placed on the plant operator's ability to quickly identify the problem and perform diagnosis and initiate recovery action to ensure the safety of the plant. However, the reliability of human action is adversely affected at the time of crisis due to time stress and psychological factors. The availability of operational aids capable of monitoring the status of the plant and quickly identifying the deviation from normal operation is expected to significantly improve the operator reliability. The development of operator support systems using probabilistic safety assessment (PSA) techniques and information is finding wide application in nuclear plant operation. Often it is observed that most of the applications use a rule-based approach for diagnosis as well as safety status/transient conditions monitoring. A more efficient approach using artificial neural networks for safety status/transient condition monitoring and rule-based systems for diagnosis and emergency procedure generation has been applied for the development of a prototype operator adviser (OPAD) system for a 100 MW(th) heavy water moderated, cooled and natural uranium fueled research reactor. The development objective of this system is to improve the reliability of operator action and hence the reactor safety at the time of crisis as well as in normal operation. In order to address safety objectives at various stages of development of OPAD, the PSA techniques and tools have been used for knowledge representation. It has been demonstrated, with recall tests on the artificial neural network, that it can efficiently identify the reactor status in real-time scenario. This paper discusses various issues related to the development of an operator support system in a comprehensive way, right from the study of safety objectives, to data collection, to implementation of such a system

  17. Surface Operations Systems Improve Airport Efficiency

    Science.gov (United States)

    2009-01-01

    With Small Business Innovation Research (SBIR) contracts from Ames Research Center, Mosaic ATM of Leesburg, Virginia created software to analyze surface operations at airports. Surface surveillance systems, which report locations every second for thousands of air and ground vehicles, generate massive amounts of data, making gathering and analyzing this information difficult. Mosaic?s Surface Operations Data Analysis and Adaptation (SODAA) tool is an off-line support tool that can analyze how well the airport surface operation is working and can help redesign procedures to improve operations. SODAA helps researchers pinpoint trends and correlations in vast amounts of recorded airport operations data.

  18. DEVELOPMENT OF OPERATING DRIVE SYSTEMS IN ENGINEERING EQUIPMENT

    Directory of Open Access Journals (Sweden)

    A. A. Kotlobai

    2015-01-01

    Full Text Available Engineering machines being in operational service with military units of  engineer troops are fit to their purpose and their application is relevant in modern conditions. Maintenance of operating conditions in engineering equipment which was produced earlier by the USSR enterprises is considered as a rather complicated task due to lack of spare parts because their production has been discontinued.One of the approaches used for maintenance of engineering equipment combat capabilities is modernization of operating drive systems that presupposes replacement of mechanical systems in working element drives by hydrostatic drives which are realized while using modern element base. Usage of hydraulic units in drive systems being in mass production for replacement of mechanical systems manufactured earlier in small batches makes it possible to reduce labour inputs for maintenance and repair of machines. The paper presents some possibilities for development of operating drive systems in engineering equipment. The proposed approach is given through an example of  engineering obstacle-clearing vehicle (IMR-2M and excavation machines (MDK-3 and MDK-2M.Application of a hydraulic drive in working elements of the excavation machines permits to withdraw from cardan  shafts, a gear box, a rotary gear and an overload clutch. A hydraulic motor of the cutter and thrower drive is mounted  on a working element gearbox. While executing modernization of hydraulic systems in excavation machines a pump unit has been proposed for the cutter and thrower drive which consists of a controlled pump and a system for automatic maintenance of the pump operational parameters. While developing the operating drive systems in engineering equipment in accordance with the proposed requirements it is possible to simplify drive systems of working elements and  ensure reliable machinery operation in the units of engineer troops. 

  19. An operating environment for control systems on transputer networks

    NARCIS (Netherlands)

    Tillema, H.G.; Schoute, Albert L.; Wijbrans, K.C.J.; Wijbrans, K.C.J.

    1991-01-01

    The article describes an operating environment for control systems. The environment contains the basic layers of a distributed operating system. The design of this operating environment is based on the requirements demanded by controllers which can be found in complex control systems. Due to the

  20. A Common Definition of the System Operators' Core Activities

    International Nuclear Information System (INIS)

    2006-02-01

    In this report a common definition of the system operator's core activities in the Nordic countries is identified and also a list of non-core activities is introduced. As a starting point the common tasks for system responsibility as identified by Nordel has been used for the work. The term TSO (Transmission System Operator) is employed as a common denominator in the report. It is found out that the TSOs carry out common core activities in the roles as a transmission operator, a system operator and a balance settlement responsible. The core activities for the TSO as a transmission network operator are: Maintain the adequate transmission system in the long run and network development plan on the national as well as on the Nordic level using sophisticated analysis and planning methods and tools. Plan the transmission network on the national as well as on the Nordic level utilising new investments, renewal and maintenance of existing network components so that the network is secure to operate and adequate transmission capacity is guaranteed. Aim at timely network expansions using enhanced information exchange between the Nordic TSOs, and on the national level between the TSO and distribution and regional network operators, large consumers and large producers. Secure the technical compatibility with networks across the border and within a country by establishing connection requirements on the national level and ensuring that the national requirements are compatible across the Nordic power system. The core activities for the TSO as a system operator are: Define common technical requirements for the secure system operation using common planning, operation, connection and data exchange procedures. Secure the system operation with the operational planning for the following year by using information exchange between TSOs enabling the TSOs to make the best possible forecast of the global grid situation in order to assess the flows in their network and the available