WorldWideScience

Sample records for system maintenance personnel

  1. Training of maintenance personnel

    International Nuclear Information System (INIS)

    Rabouhams, J.

    1986-01-01

    This lecture precises the method and means developed by EDF to ensure the training of maintenance personnel according to their initial educational background and their experience. The following points are treated: General organization of the training for maintenance personnel in PWR and GCR nuclear power stations and in Creys Malville fast breeder reactor; Basic nuclear training and pedagogical aids developed for this purpose; Specific training and training provided by contractors; complementary training taking into account the operation experience and feedback; Improvement of velocity, competence and safety during shut-down operations by adapted training. (orig.)

  2. Maintenance Support System Development for Maintenance Personnel in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Yim, Ho Bin; Kim, In; Lee, Seung Min; Seong, Poong Hyun

    2009-01-01

    As plants or factories get old, the number of maintenance activities increases, and so does the necessity of maintenance itself. Industries have adopted the latest technologies such as RFID, wireless sensor networking, and augmented reality to develop systems which increase human performances as well as productivity. Due to safety related concerns, nuclear power industries have been reluctant to use these fancy technologies. However, from the economics point of view, it is necessary to take advantages of novel technologies. This empirical study considers not only ergonomics view, but also the economics view when building maintenance support systems. This paper introduces brief features of five subsystems which were built to reduce human errors and advantages when each system successfully reduces those human errors

  3. Maintenance Support System Development for Maintenance Personnel in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Yim, Ho Bin; Kim, In; Lee, Seung Min; Seong, Poong Hyun [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2009-05-15

    As plants or factories get old, the number of maintenance activities increases, and so does the necessity of maintenance itself. Industries have adopted the latest technologies such as RFID, wireless sensor networking, and augmented reality to develop systems which increase human performances as well as productivity. Due to safety related concerns, nuclear power industries have been reluctant to use these fancy technologies. However, from the economics point of view, it is necessary to take advantages of novel technologies. This empirical study considers not only ergonomics view, but also the economics view when building maintenance support systems. This paper introduces brief features of five subsystems which were built to reduce human errors and advantages when each system successfully reduces those human errors.

  4. System reliability as perceived by maintenance personnel on petroleum production facilities

    International Nuclear Information System (INIS)

    Antonovsky, A.; Pollock, C.; Straker, L.

    2016-01-01

    The aim of this research was to understand the relationship between maintenance staff perceptions of organisational effectiveness and operational reliability in petroleum operations. Engineering measures exist that assess the effectiveness of maintenance and reliability of equipment. These measures are typically retrospective and may not provide insight into what impedes system reliability. Perceptions of organisational effectiveness by the workforce may provide a predictive measure that could improve our understanding of the human factors that influence system reliability. Maintenance personnel (n=133) from nine petroleum production facilities completed a survey as part of a study of human factors and maintenance reliability. 69 respondents (51.9%) provided comments to an open-ended question in the survey, and these data were analysed using Interpretive Phenomenological Analysis to extract themes. Four super-ordinate themes were identified from the analysis: 1) Communication and access to information, 2) Efficiency of current work systems, 3) Need for better workgroup support, and 4) Management impacts on the workplace. We found a significant relationship between the frequency of the four super-ordinate themes and the facility reliability level as measured by ‘Mean Time Between Failures’: χ"2(6,N=158)=16.2, p=.013. These results demonstrated that operational effectiveness might be differentiated on the basis of survey-derived perceptions of maintenance personnel. - Highlights: • Thematic analysis of survey comments provided insights into workplace reliability • Worker’s comments on reliability related to technical data on time between failures • Management decision-making was the main theme in the lower reliability workplaces • Improving efficiency was the main theme in the higher reliability workplaces • Communication and better workgroup support were themes at all reliability levels

  5. Maintenance Personnel Performance Simulation (MAPPS) model

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Wolf, J.J.; Knee, H.E.; Haas, P.M.

    1984-01-01

    A stochastic computer model for simulating the actions and behavior of nuclear power plant maintenance personnel is described. The model considers personnel, environmental, and motivational variables to yield predictions of maintenance performance quality and time to perform. The mode has been fully developed and sensitivity tested. Additional evaluation of the model is now taking place

  6. Improving human performance in maintenance personnel

    International Nuclear Information System (INIS)

    Gonzalez Anez, Francisco; Agueero Agueero, Jorge

    2010-01-01

    The continuous evolution and improvement of safety-related processes has included the analysis, design and development of training plans for the qualification of maintenance nuclear power plant personnel. In this respect, the international references in this area recommend the establishment of systematic qualification programmes for personnel performing functions or carrying out safety related tasks. Maintenance personnel qualification processes have improved significantly, and training plans have been designed and developed based on Systematic Approach to Training methodology to each job position. These improvements have been clearly reflected in recent training programmes with new training material and training facilities focused not only on developing technical knowledge and skills but also on improving attitudes and safety culture. The objectives of maintenance training facilities such as laboratories, mock-ups real an virtual, hydraulic loops, field simulators and other training material to be used in the maintenance training centre are to cover training necessities for initial and continuous qualification. Evidently, all these improvements made in the qualification of plant personnel should be extended to include supplemental personnel (external or contracted) performing safety-related tasks. The supplemental personnel constitute a very spread group, covering the performance of multiple activities entailing different levels of responsibility. Some of these activities are performed permanently at the plant, while others are occasional or sporadic. In order to establish qualification requirements for these supplemental workers, it is recommended to establish a rigorous analysis of job positions and tasks. The objective will be to identify the qualification requirements to assure competence and safety. (authors)

  7. Asbestos exposure of building maintenance personnel.

    Science.gov (United States)

    Mlynarek, S; Corn, M; Blake, C

    1996-06-01

    The exposures of building maintenance personnel and occupants to airborne asbestos fibers, and the effects of operations and maintenance programs on those exposures, continue to be an important public health issue. The subject of this investigation was a large metropolitan county with numerous public buildings which routinely conducted air sampling for asbestos. A total of 302 personal air samples in nine task categories collected during maintenance worker activities in proximity to asbestos-containing materials were analyzed; 102 environmental air samples in four task categories were also analyzed. The arithmetic means of the 8-hr time weighted average exposures for personal sampling for each task category were all below the Occupational Safety and Health Administration permissible exposure level of 0.1 fibers (f)/cc > 5 microm. The highest mean 8-hr time weighted average exposure was 0.030 f/cc > 5 microm for ceiling tile replacement. The maximum asbestos concentration during sample collection for environmental samples was 0.027 f/cc > 5 microm. All asbestos-related maintenance work was done within the framework of an Operations and Maintenance Program (OMP) which utilized both personal protective equipment and controls against fiber release/dispersion. Results are presented in association with specific OMP procedures or controls. These results support the effectiveness of using Operations and Maintenance Programs to manage asbestos in buildings without incurring unacceptable risk to maintenance workers performing maintenance tasks.

  8. Proficiency evaluation of maintenance personnel: Training equivalency determination

    International Nuclear Information System (INIS)

    Price, W.J.

    1991-01-01

    The nuclear industry has recognized the importance of safe, quality, productive maintenance practices and has taken a number of initiatives that have generally improved maintenance programs. Because proficient maintenance practices are critical to plant safety and reliability, most plants have also recognized the need for reliable, valid testing techniques that demonstrate and assure the competence of their maintenance personnel. Until now, resource demands were too great to develop in-plant testing programs. In the past, maintenance supervisors have exempted personnel from training, using informal judgment of the employees' previous training and experience and informal observation of the employee on the job. While this procedure may have some degree of validity, it fails to provide the documentation for training equivalency that is required to satisfy the US Nuclear Regulatory Commission (NRC) regulations and Institute of Nuclear Power Operations (INPO) guidelines. To assess and demonstrate the proficiency levels of personnel, Calvert Cliffs needed to establish an objective, reliable, time-saving, and valid system to evaluate the competency levels of personnel. This was done in a joint effort with the Electric Power Research Institute

  9. A multi-agent based intelligent configuration method for aircraft fleet maintenance personnel

    Directory of Open Access Journals (Sweden)

    Feng Qiang

    2014-04-01

    Full Text Available A multi-agent based fleet maintenance personnel configuration method is proposed to solve the mission oriented aircraft fleet maintenance personnel configuration problem. The maintenance process of an aircraft fleet is analyzed first. In the process each aircraft contains multiple parts, and different parts are repaired by personnel with different majors and levels. The factors and their relationship involved in the process of maintenance are analyzed and discussed. Then the whole maintenance process is described as a 3-layer multi-agent system (MAS model. A communication and reasoning strategy among the agents is put forward. A fleet maintenance personnel configuration algorithm is proposed based on contract net protocol (CNP. Finally, a fleet of 10 aircraft is studied for verification purposes. A mission type with 3 waves of continuous dispatch is imaged. Compared with the traditional methods that can just provide configuration results, the proposed method can provide optimal maintenance strategies as well.

  10. Review of maintenance personnel practices at nuclear power plants

    International Nuclear Information System (INIS)

    Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

    1984-05-01

    As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations

  11. Development of plant maintenance systems

    International Nuclear Information System (INIS)

    Tomita, Jinji; Ike, Masae; Nakayama, Kenji; Kato, Hisatomo

    1989-01-01

    Toshiba is making active efforts for the continuing improvement of reliability and maintainability of operating nuclear power plants. As a part of these efforts, the company has developed new maintenance administration systems, diagnostic monitoring facilities for plant equipments, computer-aided expert systems, and remote-controlled machines for maintenance work. The maintenance administration systems provide efficient work plans and data acquisition capabilities for the management of personnel and equipments involved in nuclear power plant maintenance. The plant diagnostic facilities monitor and diagnose plant conditions for preventive maintenance, as well as enabling rapid countermeasures to be carried out should they be required. Expert systems utilizing artificial intelligence (AI) technology are also employed. The newly developed remote-controlled machines are useful tools for the maintenance inspection of equipment which can not be easily accessed. (author)

  12. On-Line Real-Time Management Information Systems and Their Impact Upon User Personnel and Organizational Structure in Aviation Maintenance Activities.

    Science.gov (United States)

    1979-12-01

    ON USER PERSONNEL AND ORGANIZATINAL STRUCTUREl E REAL-TIME COMPUTER-BASED MANAGEMENT INFORMATION SYSTEM ARE EXPLORED MANAGEMENT INFORMATION SRVICE...PERSONNEL AND ORGANIZATIONAL STRUCTURE IN A LOGY INTO AN ORGANIZATION CAN SIGNIFICANTLY IMPACT THE ORGANIZATION#S EFFECTIVENES ONNEL AND ORGANIZATINAL ...bureau- cracy and bolster upper level leadership . His view considered the computer system informa- tion specialists as support personel only and

  13. Experience with training of operating and maintenance personnel of nuclear power plants

    International Nuclear Information System (INIS)

    Pospisil, M.; Cencinger, F.

    1988-01-01

    The system is described of the specialist training of personnel for Czechoslovak nuclear power plants. Training consists of basic training, vocational training and training for the respective job. Responsible for the training is the Research Institute for Nuclear Power Plants; actual training takes place at three training centres. Personnel are divided into seven categories for training purposes: senior technical and economic staff, shift leaders, whose work has immediate effect on nuclear safety, engineering and technical personnel of technical units, shift leaders of technical units, personnel in technical units, shift service personnel and operating personnel, maintenance workers. Experience with training courses run at the training centre is summed up. Since 1980 the Centre has been training personnel mainly for the Dukovany nuclear power plant. Recommendations are presented for training personnel for the Temelin nuclear power plant. (Z.M.)

  14. A multi-agent based intelligent configuration method for aircraft fleet maintenance personnel

    OpenAIRE

    Feng, Qiang; Li, Songjie; Sun, Bo

    2014-01-01

    A multi-agent based fleet maintenance personnel configuration method is proposed to solve the mission oriented aircraft fleet maintenance personnel configuration problem. The maintenance process of an aircraft fleet is analyzed first. In the process each aircraft contains multiple parts, and different parts are repaired by personnel with different majors and levels. The factors and their relationship involved in the process of maintenance are analyzed and discussed. Then the whole maintenance...

  15. Maintenance work management system

    International Nuclear Information System (INIS)

    Kanai, T.; Takahashi, Y.; Takahashi, K.; Nishino, M.; Takeshige, R.

    2000-01-01

    The maintenance work management system supports the efficient drawing up of various documents for the maintenance work at nuclear power stations and the speeding up of the permission procedure. In addition, it improves the quality assurance of the safety and reliability of the maintenance work. Key merits of the system are: 1. Efficiently drawing up various documents for the maintenance work by using the stored data for the previous maintenance work and the pipe and instrument diagram (P and ID) data. 2. Supporting the management work for the completion of maintenance work safety by using the isolation information stored on the computer system. 3. Speeding up the permission procedure by electronic mail and electronic permission. 4. Displaying additional information such as the specifications of equipment, maintenance result, and maintenance plan by linking up with the database of another system. 5. Reducing the cost of hardware devices by using client/server network configurations of personal computers and a personal computer server. (author)

  16. Job analysis of maintenance-mechanic position for the nuclear power plant maintenance personnel reliability model

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Kopstein, F.F.

    1982-06-01

    The task list method of job survey was used. In collaboration with BWR and PWR personnel, a list of 107 tasks performed by maintenance mechanics was developed, grouped into: remove and install, test and repair, inspect and perform preventive maintenance, miscellaneous, communication, and report preparation. For each listed task, the questionnaire form inquired into: frequency of performance, task completion time, safety consequences of improper performance, and the amount of training required to perform the task proficiently. Scaled information was requested about seven abilities: (1) visual speed, accuracy, and recognition; (2) gross motor coordination; (3) fine manual dexterity; (4) strength and stamina; (5) cognition; (6) memory; and (7) problem solving required for function completion. Survey forms were distributed to 27 nuclear power plants. Thirty-one maintenance mechanics representing 17 plants returned the completed forms. Frequency of performing tasks was bimodally distributed: (1) between once a year and once every six months, and (2) about once a week. More than half of the tasks have potential risk consequences if improperly performed. The five tasks with the greatest risk implications in the case of inadequate performance were: (1) remove and install reactor and dry-well heads, (2) test and repair reactor system components, (3) remove and install pressurizer mechanical relief valves, (4) test and repair pressurizer relief valves, (5) remove and install core spray pumps, seals, and valves. Hierarchically, the public risk associated with the various functions was: (1) remove and install, (2) test and repair, (3) preventive maintenance, (4) miscellaneous tasks, (5) communication, and (6) report preparation

  17. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  18. Personnel external dose monitoring system

    International Nuclear Information System (INIS)

    Zhao Hengyuan

    1989-01-01

    The status and trend of personnel external dose monitoring system are introduced briefly. Their characteristics, functions and TLD bedges of some commercially available automatic TLD system, including UD-710A (Matsushita, Japan), Harshaw-2271, 2276 (Harshaw, USA), Harshaw-8000 (Harshaw/Filtrol), Studsvik-1313 (Sweden) and Pitman-800 (UK) were depicted in detail. Finally, personnel dose management and record keeping system were presented and two examples were given

  19. Remote Maintenance Monitoring System -

    Data.gov (United States)

    Department of Transportation — The Remote Maintenance and Monitoring System (RMMS) is a collection of subsystems that includes telecommunication components, hardware, and software, which serve to...

  20. Army Maintenance System Transformation

    National Research Council Canada - National Science Library

    Gilbertson, Frank V

    2006-01-01

    .... Used in conjunction with pertinent historical data and developed with Army transformation goals in mind, General Systems thinking can provide the framework for guiding maintenance transformation...

  1. Maintenance personnel performance simulation (MAPPS): a model for predicting maintenance performance reliability in nuclear power plants

    International Nuclear Information System (INIS)

    Knee, H.E.; Krois, P.A.; Haas, P.M.; Siegel, A.I.; Ryan, T.G.

    1983-01-01

    The NRC has developed a structured, quantitative, predictive methodology in the form of a computerized simulation model for assessing maintainer task performance. Objective of the overall program is to develop, validate, and disseminate a practical, useful, and acceptable methodology for the quantitative assessment of NPP maintenance personnel reliability. The program was organized into four phases: (1) scoping study, (2) model development, (3) model evaluation, and (4) model dissemination. The program is currently nearing completion of Phase 2 - Model Development

  2. Study on Maintenance Personnel Development Plan For The Exported APR1400 Commissioning

    International Nuclear Information System (INIS)

    Cho, Sungbae; Kim, Jongdae; Jun, Hokwang; Hwang, Inok; Kang, Jaeyuel

    2012-01-01

    This paper indicates ways to develop maintenance personnel for the exported APR1400 commissioning. The exported APR1400 has not been experienced ay maintenance yet, and requirements for maintenance personnel have not been clarified yet. Based on sound maintenance experience, KEPCO Plant Service and Engineering Company (KEPCO KPS) has studied on maintenance training and career requirement to establish a development plan of the maintenance personnel for the exported nuclear power plant. By defining manpower and training requirement, and mobilization plan, we expect to secure reliability of the exported APR1400

  3. Maintenance personnel performance simulation (MAPPS) model: overview and evaluation efforts

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.; Bartter, W.D.; Wolf, J.J.; Ryan, T.G.

    1984-01-01

    The development of the MAPPS model has been completed and the model is currently undergoing evaluation. These efforts are addressing a number of identified issues concerning practicality, acceptability, usefulness, and validity. Preliminary analysis of the evaluation data that has been collected indicates that MAPPS will provide comprehensive and reliable data for PRA purposes and for a number of other applications. The MAPPS computer simulation model provides the user with a sophisticated tool for gaining insights into tasks performed by NPP maintenance personnel. Its wide variety of input parameters and output data makes it extremely flexible for application to a number of diverse applications. With the demonstration of favorable model evaluation results, the MAPPS model will represent a valuable source of NPP maintainer reliability data and provide PRA studies with a source of data on maintainers that has previously not existed

  4. 76 FR 81359 - National Security Personnel System

    Science.gov (United States)

    2011-12-28

    ... Security Personnel System AGENCY: Department of Defense; Office of Personnel Management. ACTION: Final rule... concerning the National Security Personnel System (NSPS). Section 1113 of the National Defense Authorization... National Security Personnel System (NSPS) in regulations jointly prescribed by DOD and OPM (Office of...

  5. Initial training and technology transfer during the generational transition in the personnel of maintenance

    International Nuclear Information System (INIS)

    Gonzalez Anez, F.

    2006-01-01

    A significant progress in training capabilities of nuclear power plants maintenance personnel has taken place since mid of nineties. In the past, maintenance personnel acquired their competence throughout the years on their job positions. A greater flexibility and new polyvalence requirements demand efficient training actions. In addition, the new personnel incomes associated to the generational change require clear qualification processes. The objective is to develop didactic means and to have competent instructors to preserve and to transfer the knowledge acquires during all these past years to the new incorporations. This article describes a summary of actions and methods followed for the design, development and implantation of training plans for maintenance personnel. (Author)

  6. The LHC personnel safety system

    International Nuclear Information System (INIS)

    Ninin, P.; Valentini, F.; Ladzinski, T.

    2011-01-01

    Large particle physics installations such as the CERN Large Hadron Collider require specific Personnel Safety Systems (PSS) to protect the personnel against the radiological and industrial hazards. In order to fulfill the French regulation in matter of nuclear installations, the principles of IEC 61508 and IEC 61513 standard are used as a methodology framework to evaluate the criticality of the installation, to design and to implement the PSS.The LHC PSS deals with the implementation of all physical barriers, access controls and interlock devices around the 27 km of underground tunnel, service zones and experimental caverns of the LHC. The system shall guarantee the absence of personnel in the LHC controlled areas during the machine operations and, on the other hand, ensure the automatic accelerator shutdown in case of any safety condition violation, such as an intrusion during beam circulation. The LHC PSS has been conceived as two separate and independent systems: the LHC Access Control System (LACS) and the LHC Access Safety System (LASS). The LACS, using off the shelf technologies, realizes all physical barriers and regulates all accesses to the underground areas by identifying users and checking their authorizations.The LASS has been designed according to the principles of the IEC 61508 and 61513 standards, starting from a risk analysis conducted on the LHC facility equipped with a standard access control system. It consists in a set of safety functions realized by a dedicated fail-safe and redundant hardware guaranteed to be of SIL3 class. The integration of various technologies combining electronics, sensors, video and operational procedures adopted to establish an efficient personnel safety system for the CERN LHC accelerator is presented in this paper. (authors)

  7. Education as a Basic Element of Improving Professional Important Qualities of Aviation Technical Maintenance Personnel

    Directory of Open Access Journals (Sweden)

    Gorbačovs Oļegs

    2016-12-01

    Full Text Available In this article the importance of professional qualities, competence and their increase, directly dependent on the training of aviation technical maintenance personnel and determination the level of flight safety is covered. This publication analyses necessary training and requirements for aviation technical personnel involved in aircraft maintenance, as well as the requirements for aviation training organizations, defined as per Part-147, for such personnel preparation and training.

  8. National Finance Center Personnel/Payroll System

    Data.gov (United States)

    US Agency for International Development — The NFC system is an USDA system used for processing transactions for payroll/personnel systems. Personnel processing is done through EPIC/HCUP, which is web-based....

  9. The MERC maintenance system

    International Nuclear Information System (INIS)

    Izquierdo, J.J.; Chauvire, P.; Plessis, L.

    1991-01-01

    Maintenance in the modern commercial reprocessing plants is a subject of the highest priority in order to guarantee availability for the whole life of the plant. The design concept of the UP3 reprocessing plant at La Hague identified several categories of equipment according to their maintenance design principles. Among them, Standard Process Equipment such as pumps, valves, ejectors and filters which need periodic maintenance. These equipment items are designed in removable modular form to avoid the need to disconnect piping. Removal is performed under shielding and without breach of containment through the use of a transfer cask that is connected to the cell containing the equipment to be removed. This transfer cask is called MERC (Mobile Equipment Replacement Cask). Containment is preserved by an air-tight system consisting of coupled doors, with a special connecting gasket. This system can remove and replace failed equipment, without spreading contamination to work areas. (author)

  10. Basis scheme of personnel training system

    International Nuclear Information System (INIS)

    Rerucha, F.; Odehnal, J.

    1998-01-01

    Basic scheme of the training system for NPP personnel of CEZ-EDU personnel training system is described in detail. This includes: specific training both basic and periodic, and professional training meaning specialized and continuous training. The following schemes are shown: licence acquisition and authorisation for PWR-440 Control Room Personnel; upgrade training for job positions of Control Room personnel; maintaining and refresh training; module training for certificate acquisition of servicing shift and operating personnel

  11. The Daresbury personnel safety system

    International Nuclear Information System (INIS)

    Poole, D.E.; Ring, T.

    1989-01-01

    The personnel safety system designed for the SRS at Daresbury is a unified system covering the three accelerators of the source itself, the beamlines and the experimental stations. The system has also been applied to the experimental areas of the Nuclear Structure Facility, and is therefore established as a site standard. A dual guardline interlock module forms a building block for a relay based interlock system completely independent of the machine control system, although comprehensive monitoring of the system status via the control system computer is a feature. An outline of the design criteria adopted for the system is presented together with a more detailed description of the philosophy of the guardline logic and the way this is implemented in a standard modular form. The emphasis is on the design features of a modern microprocessor based variant of the original SRS system. Experience with the original system during build-up and operation of the SRS facility is described. 2 refs., 4 figs

  12. Evaluation of radiation exposures to personnel during maintenance operations and fuel recharging at NPP with the WWER-440 reactor

    International Nuclear Information System (INIS)

    Beskrestnov, N.V.; Vasil'ev, Eh.S.; Kozlov, V.F.; Odinokov, Yu.Yu.; Romanov, V.P.; Tsypin, S.G.

    1983-01-01

    A unified data acquisition and analysis system is presented. The system is intended to assess radiation exposures to personnel and perform radiation monitoring during periodic maintenance operations sna fuel recharging at NPPs with WWER-440 reactors. The basic principles of developing this system, patterns of danita collection are considered, points of radiation motoring chosen with account of the NPP operating experience are pointed out

  13. Aircraft Maintenance Expert Systems.

    Science.gov (United States)

    1983-11-01

    PARA 2 -104)) 44: (( JETCAL ANALYSIS SHOWS SYSTEM READS CORRECT) (REPLACE FAULTY PARTS)) 45: ((OVERTEMP EXCEEDED SERVICE LIMITS) 46: I(ENGINE CONTROL...CIRCUITS WITHIN LIMITS ON JETCAL ) (REPLACE FAULTY PARTS)) 47: (ADJUST EST AT AMPLIFIER AND CHECK TENP)) (SEND ENGINE TO HIGHER LEVEL MAINTENANCE)) 48: 2

  14. Electronic Official Personnel Folder System

    Data.gov (United States)

    US Agency for International Development — The eOPF is a digital recreation of paper personnel folder that stores electronic personnel data spanning an individual's Federal career. eOPF allows employees to...

  15. 47 CFR 80.1074 - Radio maintenance personnel for at-sea maintenance.

    Science.gov (United States)

    2010-10-01

    ... maintenance. 80.1074 Section 80.1074 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Global Maritime Distress and Safety... Global Maritime Distress and Safety System related to Sea Areas A3 and A4. [57 FR 9065, Mar. 16, 1992, as...

  16. Maintenance and management system

    International Nuclear Information System (INIS)

    Ando, Yasumasa.

    1992-01-01

    Since highly reliable operation is required in a nuclear power plant, monitoring during operation and periodical inspection are conducted carefully. The present invention provides maintenance and management systems for providing an aid so that these systems are combined effectively and operated rationally based on unified information management. That is, the system contains data bases comprising information for the design of the equipments and pipelines of a plant, information for the exchange of equipment parts, information for the history of plant operation, information for the monitoring and inspection, and information for the management of repair operation. In addition, it has an equipment part history management sub-system for managing equipment part exchange information, an operation history management sub-system for managing the operation state of the plant, an operation history management sub-system for managing equipment monitoring inspection data and operation management sub-system for managing periodical inspection/ repairing operation. These sub-systems are collectively combined to manage the maintenance and management jobs of the plant unitarily. (I.S.)

  17. An experimental maintenance management system.

    Science.gov (United States)

    1979-01-01

    The purpose of this study was to evaluate Virginia's maintenance management system and to recommend modifications directed at improving it. The study revealed that (1) the current system of allocating maintenance monies is based upon centerline milea...

  18. Comparison of all-remote and personnel access maintenance operations for INTOR

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Finn, P.A.; Gohar, M.Y.; Stasko, R.R.

    1985-01-01

    The INTOR reference design was developed to permit limited maintenance operations external to the reactor in a ''hands-on'' mode; all internal operations would be remotely accomplished. The design embodies those requirements for shielding, tritium containment and cleanup, and confinement of contaminated particulate matter to permit personnel access. The cost reflects these requirements, at least first order. The impact of personnel access on the reactor design and its costs are cause to reexamine the maintenance approach on which much of the present configuration is based. The purpose of this study is to compare the benefits and costs associated with personnel access maintenance procedures to those associated with all-remote maintenance procedures and to identify modifications to the baseline design that could enhance maintenance operations

  19. Sexual function in F-111 maintenance workers: the study of health outcomes in aircraft maintenance personnel.

    Science.gov (United States)

    Brown, Anthony; Gibson, Richard; Tavener, Meredith; Guest, Maya; D'Este, Catherine; Byles, Julie; Attia, John; Horsley, Keith; Harrex, Warren; Ross, James

    2009-06-01

    In Australia, four formal F-111 fuel tank deseal/reseal (DSRS) repair programs were implemented over more than two decades, each involving different processes and using a range of hazardous substances. However, health concerns were raised by a number of workers. The "Study of Health Outcomes in Aircraft Maintenance Personnel" was commissioned by the Australian Department of Defence to investigate potential adverse health outcomes as a result of being involved in the deseal/reseal processes. To compare measures of sexual function in F-111 aircraft fuel tank DSRS maintenance workers, against two appropriate comparison groups. Exposed and comparison participants completed a postal questionnaire which included general questions of health and health behavior, and two specific questions on sexual functioning. They also completed the International Index of Erectile Function (IIEF) questionnaire. Logistic regression was used to explore exposure status and outcome while adjusting for potential confounders. The three outcomes of interest for this study were the proportion of participants with erectile dysfunction (ED) according to the IIEF, the proportion with self-reported loss of interest in sex, and the proportion with self-reported problems with sexual functioning. Compared with each of the comparison groups, a larger proportion of the exposed group reported sexual problems and were classified as having ED according to the IIEF. In logistic regression, the odds of all three outcomes were higher for exposed participants relative to each comparison group and after adjustment for potentially confounding variables including anxiety and depression. There was a consistent problem with sexual functioning in the exposed group that is not explained by anxiety and depression, and it appears related to DSRS activities.

  20. Maintenance Effectiveness and Target Observation System and its ERP Interface

    International Nuclear Information System (INIS)

    Soon, Han Seong; Kim, Gi Yong; Seo, Mi Ro; Jeong, Hun Jong; Choi, Kwang Hee; Hong, Sung Yull

    2005-01-01

    Maintenance effectiveness and target observation system (MENTOS) is a maintenance rule (MR) implementation software for plant personnel to collect, edit, store, and analyze all information required for the MR implementation. Potential users and the developers of MENTOS have decided that MENTOS is implemented in the ERP system of KHNP. This article describes MENTOS briefly and introduces the ERP interface of MENTOS

  1. Khmelnitsky NPP personnel training system improvement

    International Nuclear Information System (INIS)

    Sapronov, V.G.; Issupov, V.I.

    1996-01-01

    Khmelnitsky nuclear power plant personnel training system improvement is described, including creation of Training center, development of training courses based on SAT methodology, development of training hardware

  2. DOE handbook: Guide to good practices for training and qualification of maintenance personnel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The purpose of this Handbook is to provide contractor training organizations with information that can be used to verify the adequacy of and/or modify existing maintenance training programs, or to develop new training programs. This guide, used in conjunction with facility-specific job analyses, provides a framework for training and qualification programs for maintenance personnel at DOE reactor and nonreactor nuclear facilities. Recommendations for qualification are made in four areas: education, experience, physical attributes, and training. The functional positions of maintenance mechanic, electrician, and instrumentation and control technician are covered by this guide. Sufficient common knowledge and skills were found to include the three disciplines in one guide to good practices. Contents include: qualifications; on-the-job training; trainee evaluation; continuing training; training effectiveness evaluation; and program records. Appendices are included which relate to: administrative training; industrial safety training; fundamentals training; tools and equipment training; facility systems and component knowledge training; facility systems and component skills training; and specialized skills training.

  3. DOE handbook: Guide to good practices for training and qualification of maintenance personnel

    International Nuclear Information System (INIS)

    1996-03-01

    The purpose of this Handbook is to provide contractor training organizations with information that can be used to verify the adequacy of and/or modify existing maintenance training programs, or to develop new training programs. This guide, used in conjunction with facility-specific job analyses, provides a framework for training and qualification programs for maintenance personnel at DOE reactor and nonreactor nuclear facilities. Recommendations for qualification are made in four areas: education, experience, physical attributes, and training. The functional positions of maintenance mechanic, electrician, and instrumentation and control technician are covered by this guide. Sufficient common knowledge and skills were found to include the three disciplines in one guide to good practices. Contents include: qualifications; on-the-job training; trainee evaluation; continuing training; training effectiveness evaluation; and program records. Appendices are included which relate to: administrative training; industrial safety training; fundamentals training; tools and equipment training; facility systems and component knowledge training; facility systems and component skills training; and specialized skills training

  4. Maintenance Personnel Performance Simulation (MAPPS) model: description of model content, structure, and sensitivity testing. Volume 2

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Wolf, J.J.; Knee, H.E.

    1984-12-01

    This volume of NUREG/CR-3626 presents details of the content, structure, and sensitivity testing of the Maintenance Personnel Performance Simulation (MAPPS) model that was described in summary in volume one of this report. The MAPPS model is a generalized stochastic computer simulation model developed to simulate the performance of maintenance personnel in nuclear power plants. The MAPPS model considers workplace, maintenance technician, motivation, human factors, and task oriented variables to yield predictive information about the effects of these variables on successful maintenance task performance. All major model variables are discussed in detail and their implementation and interactive effects are outlined. The model was examined for disqualifying defects from a number of viewpoints, including sensitivity testing. This examination led to the identification of some minor recalibration efforts which were carried out. These positive results indicate that MAPPS is ready for initial and controlled applications which are in conformity with its purposes

  5. Nuclear maintenance and management system

    International Nuclear Information System (INIS)

    Yamaji, Yoshihiro; Abe, Norihiko

    2000-01-01

    The Mitsubishi Electric Co., Ltd. has developed to introduce various computer systems for desk-top business assistance in a power plant such as system isolation assisting system, operation parameter management system, and so on under aiming at business effectiveness since these ten and some years. Recently, by further elapsed years of the plants when required for further cost reduction and together with change of business environment represented by preparation of individual personal computer, further effectiveness, preparation of the business environment, and upgrading of maintenance in power plant business have been required. Among such background, she has carried out various proposals and developments on construction of a maintenance and management system integrated the business assistant know-hows and the plant know-hows both accumulated previously. They are composed of three main points on rationalization of business management and document management in the further effectiveness, preparation of business environment, TBM maintenance, introduction of CBM maintenance and introduction of maintenance assistance in upgrading of maintenance. Here was introduced on system concepts aiming at the further effectiveness of the nuclear power plant business, preparation of business environment, upgrading of maintenance and maintenance, and so on, at a background of environment around maintenance business in the nuclear power plants (cost-down, highly elapsed year of the plant, change of business environment). (G.K)

  6. Maintenance of radiation monitoring systems

    International Nuclear Information System (INIS)

    Aoyama, Kei

    2001-01-01

    As the safety and quality of atomic power facilities are more strongly required, the reliability improvement and preventive maintenance of radiation monitoring systems are important. This paper describes the maintenance of radiation monitoring systems delivered by Fuji Electric and the present status of preventive maintenance technology. Also it introduces the case that we developed a fault diagnosis function adopting a statistics technique and artificial intelligence (AI) and delivered a radiation monitoring system including this function. This system can output a fault analysis result and a countermeasure from the computer in real time. (author)

  7. Development and introduction of a modular training and qualification concept for maintenance personnel

    International Nuclear Information System (INIS)

    Kumpf, Thomas; Mueller, Nina; Hofbauer, Detlef

    2009-01-01

    The presentation entitled ''Development and Introduction of a Modular Training and Qualification Concept for Maintenance Personnel'' presents the background, concept and training modules of a reactor services training concept that was jointly elaborated by a working group consisting of the ''Maintenance manager workshop'' working panel of the VGB, the Kraftwerksschule (KWS) PowerTech Training Center, and AREVA NP GmbH in Erlangen and Offenbach. This concept is part of AREVA's comprehensive training and qualification approach which comprises inter alia extensive introduction sessions for new employees, the corporation-wide highly appreciated AREVA University as well as specialized training facilities as for example the CETIC in Chalon-sur-Saone, France and the training center in Lynchburg, USA, or the worldwide largest integration center for digital I and C equipment for safety applications in nuclear power plants in Erlangen. AREVA NP's training concept for maintenance personnel addresses not only employees from AREVA NP working in nuclear maintenance but also personnel from nuclear power plants as well as independent experts, representatives from authorities and other interest groups. (orig.)

  8. A Self-Evaluation Tool for Development of Maintenance Personnel's Competences

    International Nuclear Information System (INIS)

    Piirto, A.; Paajanen, P.; Kantola, J.; Vanharanta, H.

    2007-01-01

    Teollisuuden Voima Oy (TVO) operates Olkiluoto nuclear power plant, which consists of twin 840 MWe BWR units. The first nuclear power plant unit, Olkiluoto 1, was connected to the national grid in September 1978 and the second almost identical unit, Olkiluoto 2, in February 1980. The construction of the third 1600 MWe PWR unit, Olkiluoto 3, was started in the spring 2005. The commercial operation of the new unit will start in 2009. The operation results of TVO's nuclear power plant units have been among the best ones in the world. The operational success is primary attributable to the early elimination of technical problems and preparation for defects beforehand. Also development of outage planning, maintenance methods and a low rate of disturbances have been very significant in achieving good operation results. TVO's long-term goals in operation and maintenance are: - keeping the load factor over 90 % and avoiding operational disturbances; - keeping the technical condition of the plant units 'as new'; - continuous learning and development of operation and maintenance functions; - decreasing the production costs. These goals also set requirements for maintenance personnel's competences. The high-grade competence of maintenance personnel has an effect on safe and reliable nuclear power plant operation. However, as a concept, safety is not always easy to define. A high level of safety is the result of the complex interaction of good design, operational safety and human performance: A set of indicators which are designed to monitor all aspects of operational safety performance are needed to form a total picture of the safe plant operation. In the framework six key areas of improvement of nuclear safety are defined. These key areas of improvement are based on the vision that the plant operates with low risk. Implementation of the actions will result in direct and permanent positive impact on plant nuclear safety and safety culture. The information gained from

  9. Development of an intellectual maintenance management system. Development of trouble detection and troubleshooting evaluation system

    International Nuclear Information System (INIS)

    Suda, Kazunori; Yoshikawa, Shinji; Tani, Satoshi

    1998-03-01

    Many research activities are conducted to enhance cost performance and safety of nuclear power plants operation and maintenance. Concept of autonomous operating system to equal the role of operators and of maintenance personnel with artificial intelligence and autonomous robots has been developed. An intellectual maintenance management system has been developed to be equipped with decision making functions of maintenance personnel. The intellectual maintenance management system is in charge of maintenance function of an autonomous plant, which consists of plant-wide monitoring, evaluation of component integrity, and scheduling of maintenance activities. In other words, this system should be equipped with preventive maintenance and corrective maintenance functions those are currently loaded on personnel. In this report, we discussed condition monitoring maintenance in the preventive maintenance. We also reported a sensor validation system development for machinery condition monitoring and diagnosis. We adopted distributed and cooperative system construction technique, which is expected recently in applications to large-scale plants. This system has inter-agent communication function for signal transmission and reception among distributed physics models of machineries. The system has been constructed for water/steam system of the LMFBR power plant. The system has been validated to be capable of cooperative sensor validation by the distributed set of agents, with quantitative indication of sensor deviation based on a newly developed fuzzy algorithm with inter-agent cooperation. The derived reference parameter value from the inter-agent evaluations also stands for the alternative measurement to the malfunctioned sensor. (author)

  10. MAPPS (Maintenance Personnel Performance Simulation): a computer simulation model for human reliability analysis

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.

    1985-01-01

    A computer model has been developed, sensitivity tested, and evaluated capable of generating reliable estimates of human performance measures in the nuclear power plant (NPP) maintenance context. The model, entitled MAPPS (Maintenance Personnel Performance Simulation), is of the simulation type and is task-oriented. It addresses a number of person-machine, person-environment, and person-person variables and is capable of providing the user with a rich spectrum of important performance measures including mean time for successful task performance by a maintenance team and maintenance team probability of task success. These two measures are particularly important for input to probabilistic risk assessment (PRA) studies which were the primary impetus for the development of MAPPS. The simulation nature of the model along with its generous input parameters and output variables allows its usefulness to extend beyond its input to PRA

  11. The Maintenance Personnel Performance Simulation (MAPPS) model: A human reliability analysis tool

    International Nuclear Information System (INIS)

    Knee, H.E.

    1985-01-01

    The Maintenance Personnel Performance Simulation (MAPPS) model is a computerized, stochastic, task-oriented human behavioral model developed to provide estimates of nuclear power plant (NPP) maintenance team performance measures. It is capable of addressing person-machine, person-environment, and person-person relationships, and accounts for interdependencies that exist between the subelements that make up the maintenance task of interest. The primary measures of performance estimated by MAPPS are: 1) the probability of successfully completing the task of interest and 2) the task duration time. MAPPS also estimates a host of other performance indices, including the probability of an undetected error, identification of the most- and least-likely error-prone subelements, and maintenance team stress profiles during task execution

  12. Performance estimates for personnel access control systems

    International Nuclear Information System (INIS)

    Bradley, R.G.

    1980-10-01

    Current performance estimates for personnel access control systems use estimates of Type I and Type II verification errors. A system performance equation which addresses normal operation, the insider, and outside adversary attack is developed. Examination of this equation reveals the inadequacy of classical Type I and II error evaluations which require detailed knowledge of the adversary threat scenario for each specific installation. Consequently, new performance measures which are consistent with the performance equation and independent of the threat are developed as an aid in selecting personnel access control systems

  13. PAMTRAK: A personnel and material tracking system

    International Nuclear Information System (INIS)

    Anspach, D.A.; Anspach, J.P.; Crain, B. Jr.

    1996-01-01

    There is a need for an automated system for protecting and monitoring sensitive or classified parts and material. Sandia has developed a real-time personnel and material tracking system (PAMTRAK) that has been installed at selected DOE facilities. It safeguards sensitive parts and material by tracking tags worn by personnel and by monitoring sensors attached to the parts or material. It includes remote control and alarm display capabilities and a complementary program in Keyhole to display measured material attributes remotely. This paper describes the design goals, the system components, current installations, and the benefits a site can expect when using PAMTRAK

  14. The ITER remote maintenance system

    International Nuclear Information System (INIS)

    Tesini, A.; Palmer, J.

    2008-01-01

    The aim of this paper is to summarize the ITER approach to machine components maintenance. A major objective of the ITER project is to demonstrate that a future power producing fusion device can be maintained effectively and offer practical levels of plant availability. During its operational lifetime, many systems of the ITER machine will require maintenance and modification; this can be achieved using remote handling methods. The need for timely, safe and effective remote operations on a machine as complex as ITER and within one of the world's most hostile remote handling environments represents a major challenge at every level of the ITER Project organization, engineering and technology. The basic principles of fusion reactor maintenance are presented. An updated description of the ITER remote maintenance system is provided. This includes the maintenance equipment used inside the vacuum vessel, inside the hot cell and the hot cell itself. The correlation between the functions of the remote handling equipment, of the hot cell and of the radwaste processing system is also described. The paper concludes that ITER has equipped itself with a good platform to tackle the challenges presented by its own maintenance and upgrade needs

  15. Computer Operating System Maintenance.

    Science.gov (United States)

    1982-06-01

    FACILITY The Computer Management Information Facility ( CMIF ) system was developed by Rapp Systems to fulfill the need at the CRF to record and report on...computer center resource usage and utilization. The foundation of the CMIF system is a System 2000 data base (CRFMGMT) which stores and permits access

  16. Formation of maintenance economic safety enterprise system

    Directory of Open Access Journals (Sweden)

    N. A. Serebryakova

    2016-01-01

    Full Text Available The article examines the issues of economic security. The operation of enterprises is being implemented in a volatile market environment, which requires a comprehensive assessment of not only the individual factors affecting the operation of the enterprise, but also encourages the need to develop a comprehensive system for the enterprise to ensure economic security. The purpose of this study is to examine the theoretical and methodological approaches to assessing and ensuring the economic security of the enterprise, the development of a mechanism to ensure the economic security of the enterprise. Measures to ensure the safety of personnel suggest preventive work with the personnel, training personnel of the security services division, formation of personnel reserve of security personnel, the organization of work with new employees, reducing staff turnover. Preventive measures to minimize include activities not directly related to the activities of security units, but to minimize losses of commercial enterprise in the course of maintenance operations: control of inventories; control document; scheduled and unscheduled inspections during the reception of the goods; selection and organization of the movement control risk goods. Development of guidelines and regulations involves the planning of a clear legal regulation of all processes for the operation of commercial facility, potentially dangerous from the point of view of any commercial activity or threats to the security risks. The success of the activities is largely determined by the speed and accuracy of enterprise responses to emerging threats, where a key determinant of the effectiveness of business, is to create a system to ensure the economic security of the enterprise.

  17. Delphi Interface Maintenance System -

    Data.gov (United States)

    Department of Transportation — DIMS is the primary financial information system for tracking federally funded highway projects. It tracks authorizations, obligations, apportionments, allocations,...

  18. Development of maintenance engineering system

    International Nuclear Information System (INIS)

    1995-03-01

    Department of JMTR project has developed the Maintenance Engineering System which evaluates the aging tendency of the facilities. The system is used for the repair plan and the replace period of parts, components, equipments or facilities. The system has the data-base which consists of the check data, the inspection data, the trouble data and the repair data at the JMTR since the virgin criticality. The system is utilized maintenance works and concludes the maintenance procedures for the failure components, equipments and facilities. This system has the following characteristics. (1) Anybody can operate the system as easily as word processor. (2) Data are put into by man-machine-interface. (3) The data sheets are with light color and the recognizable arrangements. (4) The system is cost-efficient using commercial personal computers and applications. The research card and the layouts of the input data sheet had been formatted. Data has been begun to be put into the system and to check its functions. The result demonstrates that the system is available for preventive maintenance at the JMTR. (author)

  19. Automated Maintenance Management System -

    Data.gov (United States)

    Department of Transportation — To achieve the to-be state of a modernized supply chain infrastructure and the NextGen Mission Service Requirements, the System Information Modernization initiative...

  20. LANSCE personnel access control system (PACS)

    International Nuclear Information System (INIS)

    Sturrock, J.C.; Gallegos, F.R.; Hall, M.J.

    1997-01-01

    The Radiation Security System (RSS) at the Los Alamos Neutron Science Center (LANSCE) provides personnel protection from prompt radiation due to accelerated beam. The Personnel Access Control System (PACS) is a component of the RSS that is designed to prevent personnel access to areas where prompt radiation is a hazard. PACS was designed to replace several older personnel safety systems (PSS) with a single modem unified design. Lessons learned from the operation over the last 20 years were incorporated into a redundant sensor, single-point failure safe, fault tolerant, and tamper-resistant system that prevents access to the beam areas by controlling the access keys and beam stoppers. PACS uses a layered philosophy to the physical and electronic design. The most critical assemblies are battery backed up, relay logic circuits; less critical devices use Programmable Logic Controllers (PLCs) for timing functions and communications. Outside reviewers have reviewed the operational safety of the design. The design philosophy, lessons learned, hardware design, software design, operation, and limitations of the device are described

  1. Integrated Personnel and Pay System-Army Increment 2 (IPPS-A Inc 2)

    Science.gov (United States)

    2016-03-01

    system maintenance, and minimizing pay discrepancies . IPPS-A Inc 2 will account for status changes between Active, Reserve, and National Guard components...2016 Major Automated Information System Annual Report Integrated Personnel and Pay System-Army Increment 2 (IPPS-A Inc 2) Defense Acquisition...703-325-3747 DSN Phone: 865-2915 DSN Fax: 221-3747 Date Assigned: May 2, 2014 Program Information Program Name Integrated Personnel and Pay System

  2. Maintenance performance improvement with System Dynamics : A Corrective Maintenance showcase

    NARCIS (Netherlands)

    Deenen, R.E.M.; Van Daalen, C.E.; Koene, E.G.C.

    2008-01-01

    This paper presents a case study of an analysis of a Corrective Maintenance process to realize performance improvement. The Corrective Maintenance process is supported by SAP, which has indicated the performance realisation problem. System Dynamics is used in a Group Model Building process to

  3. Maintenance Personnel Performance Simulation (MAPPS) model: a human reliability analysis tool

    International Nuclear Information System (INIS)

    Knee, H.E.

    1985-01-01

    The Maintenance Personnel Performance Simulation (MAPPS) model is a computerized, stochastic, task-oriented human behavioral model developed to provide estimates of nuclear power plant (NPP) maintenance team performance measures. It is capable of addressing person-machine, person-environment, and person-person relationships, and accounts for interdependencies that exist between the subelements that make up the maintenance task of interest. The primary measures of performance estimated by MAPPS are: (1) the probability of successfully completing the task of interest; and (2) the task duration time. MAPPS also estimates a host of other performance indices, including the probability of an undetected error, identification of the most- and least-likely error-prone subelements, and maintenance team stress profiles during task execution. The MAPPS model was subjected to a number of evaluation efforts that focused upon its practicality, acceptability, usefulness, and validity. Methods used for these efforts included a case method approach, consensus estimation, and comparison with observed task performance measures at a NPP. Favorable results, such as close agreement between task duration times for two tasks observed in the field (67.0 and 119.8 minutes, respectively), and estimates by MAPPS (72.0 and 124.0 minutes, respectively) enhance the confidence in the future use of MAPPS. 8 refs., 1 fig

  4. Hearing status among aircraft maintenance personnel in a commercial airline company

    Directory of Open Access Journals (Sweden)

    Greta Smedje

    2011-01-01

    Full Text Available The aim was to study subjective and objective hearing loss in a population of aircraft maintenance workers and identify predictors. A total of 327 aircraft maintenance personnel answered a self-administered work environment questionnaire (response rate 76% and underwent audiometric test. The mean values for the hearing threshold at 3, 4, and 6 kHz for the ear with the most hearing loss were compared with a Swedish population database of persons not occupationally exposed to noise. Equivalent noise exposure during a working day was measured. Relationships between subjective and objective hearing loss and possible predictors (age, years of employment, self-reported exposure to solvents, blood pressure, and psycho-social factors were analyzed by multiple logistic regression. At younger ages (<40 years, aircraft maintenance workers had higher hearing thresholds (1-3 dB compared to the reference group, but such a difference was not found in older employees. Relationships were found between age and objective hearing loss, and between exposure to solvents and reported subjective hearing loss. Equivalent noise exposure during working days were 70-91 dB(A with a maximal noise level of 119 dB(A. Aircraft maintenance workers are exposed to equivalent noise levels above the Swedish occupational standard, including some very high peak exposures. Younger employees have a higher age-matched hearing threshold level compared with a reference group. Thus, there is a need for further preventive measures.

  5. 45 CFR 201.11 - Personnel merit system review.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false Personnel merit system review. 201.11 Section 201... STATES FOR PUBLIC ASSISTANCE PROGRAMS Review and Audits § 201.11 Personnel merit system review. A personnel merit system review is carried out by the Office of State Merit Systems of the Office of the...

  6. A personnel TLD system with person identification

    International Nuclear Information System (INIS)

    Widell, C.O.

    1974-01-01

    The TLD system uses Li 2 B 4 O 7 :Mn, Si sintered tablets which are heated by hot nitrogen. The slide which holds the tablets is coded by a self adhesive polyester-aluminium tape. This tape is BCD coded in an ordinary tape punch. The information on the punched tape includes a ten digit social-security number and a two digit information on location and type of dosimetry. By this system dosimetric data is directly transfered into a central dose register for Sweden. All personnel doses are there stored on social-security numbers. (author)

  7. Using Decision Analysis to Select Facility Maintenance Management Information Systems

    Science.gov (United States)

    2010-03-01

    Hart, A., & Ratnieks, F. L. (2002). Waste management in the leaf-cutting ant Atta colombica. Behavioral Ecology , 224-231. Heintz, J., Pollin ... Pollin , & Garret-Peltier, 2009). Maintenance departments can help themselves by implementing an information system to help better manage personnel...Wastewater collection system infrastructure research needs in the USA. Urban Water , 21-29. Takata, S., Kimura, F., van Houten, F., Westkamper, E

  8. Proactive maintenance for mechanical systems

    CERN Document Server

    Fitch, EC

    1992-01-01

    Written by Dr. E.C. Fitch, the book contains over 340 double column pages which include 400 figures and tables, a comprehensive bibliography, and index. There is no root cause of mechanical failure, known to the author, that has been ignored or left out. Nowhere in the world is this information put together in such a concise and comprehensive manner, and the book will serve as a reference and guide to designers, practising engineers, maintenance technicians, plant managers and operators who must design, maintain and operate fluid-dependent mechanical systems.

  9. Characterization of a thermoluminiscence personnel dosimetry system

    International Nuclear Information System (INIS)

    Vazquez Lopez, C.; Saez, J.C.; Labarta, T.

    1989-01-01

    Various tests carried out to characterize a Thermoluminiscence Personnel Dosimetry Automatic System, based on the optical heating of a multielement dosemeter are presented. The dosemeter consists of Lithium Borate (Copper) and Calcium Sulphate (Thallium) phosphors. The Dosimetric System shows some outstanding features, such as its simplicity (no aditional annealing procedures are required), its short reading cycle (160 TLD per hour and its data handling capabilities (RS-232C and Parallel Printer digital ports and four analigic outputs for Glow Curve Adquisition). The tests performed have been designed to conform with the different existing international Standards and Recommendations (ANSI: N13.11-1983; IEC:Draft 45B-1987, ISO:DP 8034-1984) The new radiological quantities (I.C.R.U.-19855) have been used for calibration. The results obtained (linearity, repeatibility, detection threshold, residue, stability of stored information, etc) show the optimum performance of this dosimetric system in its aplication to routine personnel dose monitoring. Based on the dosemeter energy discriminating response, an algorithm for dose assesment has been developed. The method allows personal dose calculations within 10% and gives valuable information on the quality and energy of incident radiation, for photons from 30 to 2000 keV and for Beta penetrating radiation (Sr/Y, U). (Author)

  10. Critical Uses of College Resources. Part I: Personnel Utilization System.

    Science.gov (United States)

    Vlahos, Mantha

    A Personnel Utilization System has been designed at Broward Community College, which combines payroll, personnel, course, and function information in order to determine the actual duties performed by personnel for the amount of remuneration received. Objectives of the system are (1) to define the tasks being performed by faculty, staff, and…

  11. 25 CFR 38.12 - Leave system for education personnel.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Leave system for education personnel. 38.12 Section 38.12 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION EDUCATION PERSONNEL § 38.12 Leave system for education personnel. (a) Full-time school-term employees. Employees on a full-time school-term...

  12. Personnel monitoring system by thermoluminescence dosimeter - a study and review

    International Nuclear Information System (INIS)

    Iyer, V.S.; Alok, M.; Chandel, B.S.

    2018-01-01

    The principle objective of personnel monitoring system is to prevent overexposure and avoid unnecessary exposure of personnel working with various sources of radiation. The adequate system of personnel monitoring must provide for the measurement. evaluation and recording of significant doses accumulated by individuals together with a recording of conditions under which these doses are received

  13. Personnel Development Practices in Turkish Education System

    Science.gov (United States)

    Ozdemir, Tuncay Yavuz

    2016-01-01

    Nowadays everything develops and changes very quickly and sustainability of organizational goals will be possible only when personnel can keep up with these changes. From administrative aspect it is important to enhance personnel's potential and prompt them to achieve organizational goals. Personnel development is a process which influences and…

  14. The ITER remote maintenance system

    International Nuclear Information System (INIS)

    Tesini, A.; Palmer, J.

    2007-01-01

    ITER is a joint international research and development project that aims to demonstrate the scientific and technological feasibility of fusion power. As soon as the plasma operation begins using tritium, the replacement of the vacuum vessel internal components will need to be done with remote handling techniques. To accomplish these operations ITER has equipped itself with a Remote Maintenance System; this includes the Remote Handling equipment set and the Hot Cell facility. Both need to work in a cooperative way, with the aim of minimizing the machine shutdown periods and to maximize the machine availability. The ITER Remote Handling equipment set is required to be available, robust, reliable and retrievable. The machine components, to be remotely handle-able, are required to be designed simply so as to ease their maintenance. The baseline ITER Remote Handling equipment is described. The ITER Hot Cell Facility is required to provide a controlled and shielded area for the execution of repair operations (carried out using dedicated remote handling equipment) on those activated components which need to be returned to service, inside the vacuum vessel. The Hot Cell provides also the equipment and space for the processing and temporary storage of the operational and decommissioning radwaste. A conceptual ITER Hot Cell Facility is described. (orig.)

  15. Experience in the recruitment, organization and training of operations and maintenance personnel for the Malaysian research reactor

    International Nuclear Information System (INIS)

    Jamal Khair Ibrahim.

    1983-01-01

    The TRIGA Reactor located at the Tun Ismail Atomic Research Centre (PUSPATI) Complex is owned and operated by the Nuclear Energy Unit of the Prime Minster's Department. The operations and maintenance personnel are part and parcel of the national civil service organization. As such, the requirement and remuneration of these personnel are handled by a central federal government personnel management agency in common with personnel from other federal government agencies. In addition, the reactor is the first and only one in Malaysia, a developing country, which is the process of committing herself towards a nuclear power programme. These factors coupled with the absence of an independent reactor operator licensing agency posed unique problems in the recruitment, organization, training and licensing of operations personnel for the facility. The paper discusses these factors and their bearing on the recruitment, training, licensing and career development prospects of the PUSPATI TRIGA Reactor operators. (author)

  16. Conceptualization of an intellectual maintenance management system

    International Nuclear Information System (INIS)

    Suda, Kazunori; Yonekawa, Tsuyoshi; Yoshikawa, Shinji; Ozawa, Kenji

    1997-04-01

    It is studied in many research institute to enhance availability and safety of nuclear power plants operation and maintenance. On this account, development of autonomous plants has been carried out to replace the role of operators with artificial intelligence and autonomous robots. We have been developing an intellectual maintenance management system since 1994. As the first step, concept of an intellectual maintenance management system was constructed. The intellectual maintenance managerial system is in charge of maintenance function of an autonomous plant. The intellectual maintenance managerial system has three functions which is monitoring state and judging abnormal machine and deciding maintenance plan by autonomy. This system has an important role of indication and communication of the result to an autonomous operation system and autonomous robot. In this examination, we adopted the distributed and cooperative system technique by multi-agent of AI technology and examined a method to enforce problem solving by cooperation of sensor and actuator. In this report, we examined trouble detection and troubleshooting evaluation and maintenance plan decision function by the distributed and cooperative system technology, the distributed and cooperative system communication-function that these information releases functions was taken on. In conceptualization of the intellectual maintenance managerial system, we clarified of major functions to constitute this system and relation between autonomous operation system and autonomous robots. We clarified the information exchange scheme between this system and an outside system furthermore. In future, we will prototype each function and inspect the total system. (author)

  17. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  18. Development of NPP personnel training system in Ukraine

    Energy Technology Data Exchange (ETDEWEB)

    Tarykin, V. [Operation Personnel Training Department, Khmelnitsky NPP, Training Center, Neteshin 30100, Khmelnitsky region (Ukraine)]. E-mail: tarykinv@ukr.net

    2005-07-01

    Modern personnel training and retraining system is a guarantee of NPPs safe reliable operation. Since the time when independence of Ukraine was proclaimed personnel training system was created directly at NPPs. This system is based on the latest legislation framework, developed subject to IAEA recommendations, gained international experience in the field of personnel training in view of increased demands to personnel qualification. Training Centers, formed at each plant, form one of the main components of NPP personnel training. Personnel training at Training Centers is performed in accordance with standard programmes. Simulator training base was created by joint efforts of specialists from the USA, Russia and Ukraine. Establishing manager training system and replacement reserves for National Nuclear Energy Generating Company 'ENERGOATOM' (NNEGC 'ENERGOATOM') managerial personnel, including training programme and training materials development, teacher selection and training, is under way. (author)

  19. Building Maintenance Management System for Heritage Museum

    Directory of Open Access Journals (Sweden)

    Md Azree Othuman Mydin

    2012-09-01

    Full Text Available An investment in the building maintenance aspect is massive throughout the world. In most of the countries, it signifies approximately 50% of the entire revenue of the construction industry. The value of buildings depends on the eminence of the maintenance invested in them. Maintenance management engages obtaining utmost advantage from the investment made on the maintenance activities. At the moment, maintenance in buildings in Malaysia is on the increase in spite of size, category, location, and ownership. This study focuses on Building Maintenance Management System for Heritage Museum, which consists of two case studies in Penang State Museum and Art Gallery, Malaysia and Museum of Perak, Malaysia. The aim of this study is to propose methods to improve the maintenance management system for heritage museum. From the results, the common problem occurs during the implementation for the maintenance of each building is the budget for the maintenance and worker’s skill. The department of each museum must have their own maintenance unit to keep an eye on the maintenance activities for their buildings in order to improve the maintenance management system in their building.

  20. Development of a daily maintenance work management system for nuclear power plants

    International Nuclear Information System (INIS)

    Yoshimura, Sadanori; Maita, Keikichi; Ogawa, Koutaro; Tabata, Nobuyuki; Shibuya, Shinya

    1999-01-01

    Maintenance work plays an important role in keeping the safety and reliability of nuclear power plants. Especially, with the recent trends of reducing the outage length, safe and reliable execution of maintenance work is more earnestly required than ever. Taking this situation into account, a daily maintenance work management system has been developed to support the execution of maintenance work for nuclear power plants. This system supports maintenance personnel in writing and approving the daily work instruction sheet and reduces their workload by providing predetermined lists of items necessary for filling up the sheet and by applying an electronic approval procedure. It also provides information through a computer network to improve the communication among maintenance personnel. For work steps to be treated in the daily work instruction sheet, an analysis was made to identify potential human errors and related counter measures, which were then linked to safety and quality assurance instructions of the sheet. Based on this information, the system automatically presents the safety and quality assurance instructions related to the work content listed in the sheet to improve the appropriateness of the instructions. A prototype of the daily maintenance work management system was developed and a trial use was made for actual periodic maintenance work at a nuclear power plant. This experience shows the usefulness of the system in reducing the workload of maintenance personnel and in providing safer work instructions. (author)

  1. Training of system engineers for Salem and Hope Creek nuclear power plant personnel

    International Nuclear Information System (INIS)

    Ketcham, S.

    1988-01-01

    To establish and maintain a high level of plant reliability at a nuclear power station, a conscientious, integrated, day-to-day effort is required from operations and maintenance personnel, as well as the engineering support groups. The catalyst and focus to ensure that this occurs within the Public Service Electric and Gas Company system is the station system engineer. These engineers have total responsibility for their designated systems. For these individuals to communicate with the operations and maintenance departments effectively, they must have an understanding of the design and operation of each and every system and the effect they may have on the overall plant. (author)

  2. A system for measuring and processing personnel dosimetric data

    International Nuclear Information System (INIS)

    Neetzel, C.R.; Rochetti, Luis

    1981-01-01

    An operative system for the measurement and on-line processing of personnel dosimetry data is described. The aim is to organize and rationalize the work involved in a personnel dosimetry service. The method considers the application to other areas of radiation protection, as well as the connection and exchange of files among the different personnel monitoring groups. The system can be interfaced with different computers (M.E.L.) [es

  3. Maintenance experiences with hand and foot monitor for monitoring alpha and beta radiation of personnel in NFC

    International Nuclear Information System (INIS)

    Ramachandra Rao, A.; Kulkarni, R.S.; Banerjee, P.K.

    2010-01-01

    NFC is producing natural uranium and enriched uranium fuels for various reactors including PHWR etc. Monitoring of α and β radiations in the active plants of NFC is very much essential in many aspects. The personnel who are handling radiation materials have to be monitored for α radiation of hands and cloths and β radiation of feet. So the Alpha and Beta Monitor became important monitoring equipment for monitoring α and β radiations of persons working in active plants of NFC. Many Alpha and Beta Monitors of make, ECIL, PLA, and Nucleonix etc. were being used in active plants in NFC. Basically α and β radiation monitors consists of four PMT (Photo Multiplier Tubes) for detection of radiation of hands and one PMT for monitoring clothes. The PMT use ZnS (Ag) as the scintillator for detection of α radiation. GM tubes are used to detect β radiation of feet. The latest Hand and Foot Monitors have been incorporated with PC based monitoring system along with software for making the monitoring process more efficient and user friendly. As an instrumentation maintenance team for these monitors, our experiences are varied. These monitors are to be periodically maintained and tested for its effective functioning in monitoring the nuclear radiation. The monitors procured from M/s. ECIL were being used since long time in these areas. The instrumentation maintenance had faced some problems with these monitors such as frequent failure of High Voltage cards, Amplifier and Counter PCB cards. Modifications were made in the circuits of High Voltage and Counter cards to minimize the failure rate and for loading of Display and Monitoring Software through Hard disk instead of from floppy disk. So the availability of monitors for monitoring radiation got improved. Later the introduction of more sophisticated α and β radiation monitors of M/s. PLA make in these areas further improved monitoring of radiation of personnel working in active areas. These monitors are more user

  4. Task oriented evaluation system for maintenance robots

    International Nuclear Information System (INIS)

    Asame, Hajime; Endo, Isao; Kotosaka, Shin-ya; Takata, Shozo; Hiraoka, Hiroyuki; Kohda, Takehisa; Matsumoto, Akihiro; Yamagishi, Kiichiro.

    1994-01-01

    The adaptability evaluation of maintenance robots to autonomous plants has been discussed. In this paper, a new concept of autonomous plant with maintenance robots are introduced, and a framework of autonomous maintenance system is proposed. Then, task-oriented evaluation of robot arms is discussed for evaluating their adaptability to maintenance tasks, and a new criterion called operability is proposed for adaptability evaluation. The task-oriented evaluation system is implemented and applied to structural design of robot arms. Using genetic algorithm, an optimal structure adaptable to a pump disassembly task is obtained. (author)

  5. [Development of Hospital Equipment Maintenance Information System].

    Science.gov (United States)

    Zhou, Zhixin

    2015-11-01

    Hospital equipment maintenance information system plays an important role in improving medical treatment quality and efficiency. By requirement analysis of hospital equipment maintenance, the system function diagram is drawed. According to analysis of input and output data, tables and reports in connection with equipment maintenance process, relationships between entity and attribute is found out, and E-R diagram is drawed and relational database table is established. Software development should meet actual process requirement of maintenance and have a friendly user interface and flexible operation. The software can analyze failure cause by statistical analysis.

  6. Radwaste treatment complex. DRAWMACS planned maintenance system

    International Nuclear Information System (INIS)

    Keel, A.J.

    1992-07-01

    This document describes the operation of the Planned Maintenance System for the Radwaste Treatment Complex. The Planned Maintenance System forms part of the Decommissioning and Radwaste Management Computer System (DRAWMACS). Further detailed information about the data structure of the system is contained in Database Design for the DRAWMACS Planned Maintenance System (AEA-D and R-0285, 2nd issue, 25th February 1992). Information for other components of DRAWMACS is contained in Basic User Guide for the Radwaste Treatment Plant Computer System (AEA-D and R-0019, July 1990). (author)

  7. Applications of RFID into Nuclear Power Plant Maintenance System

    International Nuclear Information System (INIS)

    Lee, Seung Min; Seong, Poong Hyun

    2008-01-01

    RFID (Radio Frequency Identification) system, one of the most anticipated ubiquitous technologies is an automatic identification method using devices called RFID tags. RFID antenna detects each approach of RFID tags and recognizes the tags' ID and transfer to reader to do information processing. Since first introduced in the logistics industry, production management and maintenance organization in various fields of domestic and foreign enterprises introduce the RFID. Nuclear power plants are also using RFID to manage materials lately. However, the current status on the use of RFID is just a little more advanced on the use of bar code. Therefore, it seems that the important characteristic of RFID is not enough actualized to keep seeing. In point of Maintenance Information Field based on ubiquitous technology, the most important concept is real-time information processing. And RFID is quite proper to develop this information field system because it satisfies for the matter of that concept. The leading content in ubiquitous maintenance system is that maintenance personnel can get information what he needs and he can also transfer information what he gets whenever and wherever he is. In this paper, some examples of applying RFID in development of ubiquitous maintenance system are suggested

  8. Descriptions of Transit Maintenance Management Information Systems

    Science.gov (United States)

    1984-10-01

    This 289-page report presents an overview of ten maintenance management information systems that are currently operational or near-operational on minicomputers or microcomputers. The systems described address one or more of the following concerns: co...

  9. Maintenance systems and procedures used in a nuclear power station and their relevance to other industries

    International Nuclear Information System (INIS)

    Kirk, R.R.

    1985-01-01

    The maintenance systems and procedures used at the Forsmark Nuclear Power Plant in Sweden can be viewed as a model which maintenance managers in other non-nuclear industries may adapt for their purposes. With the aid of a computerized information system covering the functions of work orders, preventative maintenance, documentation and others, plus a more conventional personnel structure, the result is an efficient, confident and well informed maintenance group. By following the basic design principles of the computerized information system used at the Forsmark Nuclear Power Station plus similar personnel structures, the performance of maintenance teams in non-nuclear manufacturing, processing and other industries could be improved to the standards of those observed

  10. Effective maintenance practices to manage system aging

    International Nuclear Information System (INIS)

    Chockie, A.; Bjorkelo, K.

    1992-01-01

    For a variety of economic and technical reasons, there has been a growing concern with the aging of complex systems and components and the role that maintenance can play in reducing this degradation. A study for the Nuclear Regulatory Commission was recently undertaken to identify effective maintenance practices that could be adapted by the nuclear industry in the United States to assist in managing the aging degradation of plant systems and components. Four organizations were examined to assess the influence that their maintenance programs have on their ability to address the systems and component aging degradation issues. An effective maintenance program was found to be essential to the management of system and component aging. The four key elements of an effective maintenance program that are important to an aging management program were identified. These are: the selection of critical systems and components; the development of an understanding of aging through the collection and analysis of equipment performance information; the development of appropriate preventive and predictive maintenance tasks to manage equipment and system aging degradation; the use of feedback mechanisms to continuously improve the management of aging systems and components. These elements were found to be common to all four organizations. In examining how the four organizations have structured their maintenance programs to include these key elements provides valuable lessons not only for the nuclear power industry, but also for any industrial organization that is concerned with the management of system and component aging degradation. This document provides detail, of these studies

  11. NASA work unit system file maintenance manual

    Science.gov (United States)

    1972-01-01

    The NASA Work Unit System is a management information system for research tasks (i.e., work units) performed under NASA grants and contracts. It supplies profiles on research efforts and statistics on fund distribution. The file maintenance operator can add, delete and change records at a remote terminal or can submit punched cards to the computer room for batch update. The system is designed for file maintenance by a person with little or no knowledge of data processing techniques.

  12. The maintenance management framework models and methods for complex systems maintenance

    CERN Document Server

    Crespo Márquez, Adolfo

    2010-01-01

    “The Maintenance Management Framework” describes and reviews the concept, process and framework of modern maintenance management of complex systems; concentrating specifically on modern modelling tools (deterministic and empirical) for maintenance planning and scheduling. It will be bought by engineers and professionals involved in maintenance management, maintenance engineering, operations management, quality, etc. as well as graduate students and researchers in this field.

  13. Predictive Maintenance and Robotic System Design

    African Journals Online (AJOL)

    pc

    2018-03-05

    Mar 5, 2018 ... Business objectives include: reduce equipment maintenance time, reduce ... Data Acquisition: Proprietary machine diagnostic systems and sensors .... and Logistics, Volume #IPart# http://www.ifac-papersonline.net,. Identifier ...

  14. Automated personnel data base system specifications, Task V. Final report

    International Nuclear Information System (INIS)

    Bartley, H.J.; Bocast, A.K.; Deppner, F.O.; Harrison, O.J.; Kraas, I.W.

    1978-11-01

    The full title of this study is 'Development of Qualification Requirements, Training Programs, Career Plans, and Methodologies for Effective Management and Training of Inspection and Enforcement Personnel.' Task V required the development of an automated personnel data base system for NRC/IE. This system is identified as the NRC/IE Personnel, Assignment, Qualifications, and Training System (PAQTS). This Task V report provides the documentation for PAQTS including the Functional Requirements Document (FRD), the Data Requirements Document (DRD), the Hardware and Software Capabilities Assessment, and the Detailed Implementation Schedule. Specific recommendations to facilitate implementation of PAQTS are also included

  15. INTOR critical issue D: maintainability. Tritium containment and personnel access vs remote maintenance, Chapter VI of the US INTOR report for Phase Two A, Part 2

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Finn, P.A.; Gohar, Y.

    1984-01-01

    The purpose of this study is to compare the benefits and costs associated with personnel access mmaintenance procedures compared to those of all-remote maintenance procedures. The INTOR Phase Two A, Part I configuration was used to make this comparison. For both approaches, capital and operating costs were considered to first order, maintenance equipment requirements were investigated, maintenance requirements common to both approaches and unique to each were identified, tritium handling requirements were outlined, and maintenance scenarios and device downtime were developed for both. In addition, estimates of person-rem exposure were made for the personnel access approach

  16. Nuclear power plant personnel training process management system

    International Nuclear Information System (INIS)

    Arjona Vazquez, Orison; Venegas Bernal, Maria del Carmen; Armeteros Lopez, Ana L.

    1996-01-01

    The system in charge the management of the training process personnel from a nuclear power plant was designed taking into account all the requirements stated in the training guide for nuclear power plant personnel and their evaluation, which were prepared by the IAEA in 1995 in order to implement the SAT in the training programs for nuclear plant personnel. In the preparations of formats and elements that shape the system, account has been taken of the views expressed in such a guide, in some other bibliography that was consulted, and in the authors own opinion mainly with regard to those issues which the guide does not go deeper into

  17. Design of Mobile Operation and Maintenance System Based on Power GIS and GPS

    Directory of Open Access Journals (Sweden)

    Jing TAO

    2017-01-01

    Full Text Available In order to solve the low efficiency of operation and maintenance and the problems of management coordination caused by the coexistence of off-line operation and maintenance and multi system coexistence in current power telecommunication operation and maintenance, this paper proposes a mobile operation and maintenance system based on power GIS and GPS location technology. The system is based on the C/S architecture, and the mobile operation and maintenance terminal is connected with the operation and maintenance management terminal through wireless and wired network. In addition to meeting basic business requirements, the system integrates power GIS functions to visually demonstrate communication resources, personnel, and failures. The staff can use the wireless mobile terminal which integrated GPS module for to operate and maintain, and can locate accurately in real time.

  18. Maintenance of radiation safety information system

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Ho Sun [Korea Institute of Nuclear Safety, Taejon (Korea, Republic of); Park, Moon Il; Chung, Chong Kyu; Lim, Bock Soo; Kim, Hyung Uk; Chang, Kwang Il; Nam, Kwan Hyun; Cho, Hye Ryan [AD center incubation LAB, Taejon (Korea, Republic of)

    2001-12-15

    The objectives of radiation safety information system maintenance are to maintain the requirement of users, change of job process and upgrade of the system performance stably and effectively while system maintenance. We conduct the code of conduct recommended by IAEA, management of radioisotope inventory database systematically using analysis for the state of inventory database integrated in this system. This system and database will be support the regulatory guidance, rule making and information to the MOST, KINS, other regulatory related organization and general public optimizationally.

  19. Remote maintenance system for nuclear facilities

    International Nuclear Information System (INIS)

    Maeda, Masafumi

    1993-01-01

    In the facilities related to atomic energy, from the viewpoint of the reduction of radiation exposure of workers and the heightening of the rate of operation of the facilities, the development of remote maintenance system is regarded as important. Meidensha Electric Manufacturing Co., Ltd. developed the bilateral control type manipulator, BILARM-83, in 1979, and has developed high performance manipulator systems. As the design of the plant that realizes the remote operation maintenance of process machinery and equipment during plant operation, the remote maintenance system by canyon cell techniques, which was adopted in Savannah River plant, USA, and has been operated for nearly 50 years, has been known. The concept of the full remote maintenance system by large scale cell techniques was shown and has been developed by Power Reactor and Nuclear Fuel Development Corp. In order to realize the remote maintenance of such large scale cells, Meidensha is developing the both arm type bilateral servo manipulator, the single arm type power manipulator, the transport system for moving them, the power and signal system and so on. Those systems were adopted for the glass solidification facilities. (K.I.)

  20. Experiences on implementation of on-the-job training programmes for maintenance personnel in Asco and Vandellos II NPP

    International Nuclear Information System (INIS)

    Gonzalez Anez, F.

    2002-01-01

    This paper presents a process and methodology for definition and implementation of On-Job-Training Programmes (OJTP) for new maintenance personnel in Asco and Vandellos II. The content of these OJTP has been defined for each maintenance job position. A simplified task analysis was carried out to specify common and specific training. Generally, the specific maintenance training programs includes training modules in classroom and workshop environment on (1) maintenance of components and (2) maintenance fundamentals of mechanical, electrical and instrumentation. This specific training has been finally completed with a OJT programme based on the execution, observation or/and discussion about the main maintenance activities under entitled worker supervision. Each lesson, task or activity is defined in a format where the training objective, milestones and deliverables are specified. The list of activities makes up the OJTP. It is based on applicable plant procedures and maintenance instruction to each job position. Several participants or actors have been defined to implement the OJTP: co-ordinator of the process, tutors for each OJT task, line maintenance manager and trainee. Co-ordinator is the link among all actors. He knows the OJTP scope and plans the training activities according to the line maintenance manager. Co-ordinator carries out a tracking process, informs to training and maintenance managers about the progress in the programme, elaborates the progress and final reports and keeps training records. Tutors, usually entitled workers in the job position, transfer the knowledge to the trainee and discuss, review and assess the trainee's performance. Trainee carries out the scheduled tasks, keeps records of work done, prepares deliverables and informs about his activities to the Co-ordinator. The OJT programme for each new maintenance worker starts with a launching meeting with all involved actors. The goals of this meeting are to explain the OJTP scope and

  1. Enlisted Personnel Individualized Career System (EPICS) Test and Evaluation

    Science.gov (United States)

    1984-01-01

    The EPICS program, which was developed using an integrated personnel systems approach ( IPSA ), delays formal school training until after personnel have...received shipboard on-job training complemented by job performance aids (3PAs). Early phases of the program, which involved developing the IPSA EPICS...detailed description of the conception and development of the EPICS IPSA model, the execution of the front-end job design analyses, 3PA and instructional

  2. Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Tabor, M.A.

    1988-01-01

    Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

  3. Ultrasonic dip seal maintenance system

    International Nuclear Information System (INIS)

    Poindexter, A.M.; Ricks, H.E.

    1978-01-01

    Disclosed is a system for removing impurities from the surfaces of liquid dip seals and for wetting the metal surfaces of liquid dip seals in nuclear components. The system comprises an ultrasonic transducer that transmits ultrasonic vibrations along an ultrasonic probe to the metal and liquid surfaces of the dip seal thereby loosening and removing those impurities

  4. Job analysis of the instrument and control technician position for the nuclear power plant maintenance personnel reliability model

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Federman, P.J.

    1983-08-01

    This report is one of a series that is planned to describe the results of a program undertaken by the Oak Ridge National Laboratory (ORNL) for the US Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, to define, develop, validate, and disseminate a methodology for the quantitative prediction of human reliability in the conduct of maintenance tasks in nuclear power plants (NPPs). ORNL has subcontracted portions of this effort to Applied Psychological Services, Inc. This report on the job analysis of the Instrument and Control technician (NUREG/CR-3274) and a report on the job analysis of the electrician position (NUREG/CR-3275) comprise a part of the initial efforts of the development phase of this program. With the publication of the job analysis of the electrician position, the series of job analyses reports addressing nuclear power plant maintenance personnel will be complete. Subsequent reports addressing model development and validation are planned

  5. Human Error Probability Assessment During Maintenance Activities of Marine Systems

    Directory of Open Access Journals (Sweden)

    Rabiul Islam

    2018-03-01

    Full Text Available Background: Maintenance operations on-board ships are highly demanding. Maintenance operations are intensive activities requiring high man–machine interactions in challenging and evolving conditions. The evolving conditions are weather conditions, workplace temperature, ship motion, noise and vibration, and workload and stress. For example, extreme weather condition affects seafarers' performance, increasing the chances of error, and, consequently, can cause injuries or fatalities to personnel. An effective human error probability model is required to better manage maintenance on-board ships. The developed model would assist in developing and maintaining effective risk management protocols. Thus, the objective of this study is to develop a human error probability model considering various internal and external factors affecting seafarers' performance. Methods: The human error probability model is developed using probability theory applied to Bayesian network. The model is tested using the data received through the developed questionnaire survey of >200 experienced seafarers with >5 years of experience. The model developed in this study is used to find out the reliability of human performance on particular maintenance activities. Results: The developed methodology is tested on the maintenance of marine engine's cooling water pump for engine department and anchor windlass for deck department. In the considered case studies, human error probabilities are estimated in various scenarios and the results are compared between the scenarios and the different seafarer categories. The results of the case studies for both departments are also compared. Conclusion: The developed model is effective in assessing human error probabilities. These probabilities would get dynamically updated as and when new information is available on changes in either internal (i.e., training, experience, and fatigue or external (i.e., environmental and operational conditions

  6. Preventive maintenance for computer systems - concepts & issues ...

    African Journals Online (AJOL)

    Performing preventive maintenance activities for the computer is not optional. The computer is a sensitive and delicate device that needs adequate time and attention to make it work properly. In this paper, the concept and issues on how to prolong the life span of the system, that is, the way to make the system last long and ...

  7. Nuclear power plant maintenance personnel reliability prediction (NPP/MPRP) effort at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.

    1981-01-01

    Human errors committed during maintenance activities are potentially a major contribution to the overall risk associated with the operation of a nuclear power plant (NPP). An NRC-sponsored program at Oak Ridge National Laboratory is attempting to develop a quantitative predictive technique to evaluate the contribution of maintenance errors to the overall NPP risk. The current work includes a survey of the requirements of potential users to ascertain the need for and content of the proposed quantitative model, plus an initial job/task analysis to determine the scope and applicability of various maintenance tasks. In addition, existing human reliability prediction models are being reviewed and assessed with respect to their applicability to NPP maintenance tasks. This paper discusses the status of the program and summarizes the results to date

  8. Development of dose rate estimation system for FBR maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Iizawa, Katsuyuki [Japan Nuclear Cycle Development Inst., Tsuruga Head Office, International Cooperation and Technology Development Center, Tsuruga, Fukui (Japan); Takeuchi, Jun; Yoshikawa, Satoru [Hitachi Engineering Company, Ltd., Hitachi, Ibaraki (Japan); Urushihara, Hiroshi [Ibaraki Hitachi Information Service Co., Ltd., Omika, Ibaraki (Japan)

    2001-09-01

    During maintenance activities on the primary sodium cooling system by an FBR Personnel radiation exposure arises mainly from the presence of radioactive corrosion products (CP). A CP behavior analysis code, PSYCHE, and a radiation shielding calculation code, QAD-CG, have been developed and applied to investigate the possible reduction of radiation exposure of workers. In order to make these evaluation methods more accessible to plant engineers, the user interface of the codes has been improved and an integrated system, including visualization of the calculated gamma-ray radiation dose-rate map, has been developed. The system has been verified by evaluating the distribution of the radiation dose-rate within the Monju primary heat transport system cells from the estimated saturated CP deposition and distribution which would be present following about 20 cycles of full power operation. (author)

  9. Development of dose rate estimation system for FBR maintenance

    International Nuclear Information System (INIS)

    Iizawa, Katsuyuki; Takeuchi, Jun; Yoshikawa, Satoru; Urushihara, Hiroshi

    2001-01-01

    During maintenance activities on the primary sodium cooling system by an FBR Personnel radiation exposure arises mainly from the presence of radioactive corrosion products (CP). A CP behavior analysis code, PSYCHE, and a radiation shielding calculation code, QAD-CG, have been developed and applied to investigate the possible reduction of radiation exposure of workers. In order to make these evaluation methods more accessible to plant engineers, the user interface of the codes has been improved and an integrated system, including visualization of the calculated gamma-ray radiation dose-rate map, has been developed. The system has been verified by evaluating the distribution of the radiation dose-rate within the Monju primary heat transport system cells from the estimated saturated CP deposition and distribution which would be present following about 20 cycles of full power operation. (author)

  10. Demonstration personnel and material tracking system at ANL-W

    International Nuclear Information System (INIS)

    Roybal, J.A.; Ortiz, S.; Henslee, S.P.

    1988-01-01

    A Personnel and Material Tracking System (PMTS) was demonstrated in the Fuel Manufacturing Facility (FMF) at Argonne National Laboratories-West (ANL-W) in July, 1987. The PMTS is intended to aid in the transfer of inventory materials from area to area within a facility such as FMF. It is also intended to assure that only those personnel who are authorized to do so may conduct these transfer operations. The PMTS Personnel Movement (PM) subsystem uses portals installed between areas to alert the system to the movement of personnel between areas. The portals are composed to two sensors, one on either side of a proximity badge reader, to detect the presence of personnel entering the portal area. However, a restricted area can be assigned to any badge holder which will cause the system to issue an alert if the badge holder passes into his/her restricted area. The PM subsystem is intended to be transparent when in use. The PMTS Inventory Material Access (IMA) subsystem provides two functions: material control and material access. The material control is provided by the Wireless Alarm Transmission of Container Handling (WATCH) system which is a sensor rf transmitter system that detects item movements. Material access is provided by the Mobile Accountability Verification Inventory Station (MAVIS) system which is a self-powered smart barcode reader

  11. Maintenance system improvement in cast iron foundry

    Directory of Open Access Journals (Sweden)

    S. Kukla

    2011-07-01

    Full Text Available The work presents the issue of technical equipment management in an iron foundry basing on the assumptions of the TPM system (Total Productive Maintenance. Exploitation analysis of automatic casting lines has been carried out and their work’s influence on the whole production system’s functioning has been researched. Within maintenance system improvement, implementation of autonomic service and planned lines’ review have been proposed in order to minimize the time of breakdown stoppages. The SMED method was used to optimize changeover time, and the OEE (Overall Equipment Effectiveness was applied to evaluate the level of resources usage before and after implementing changes. Further, the influence of the maintenance strategy of casting devices’ efficiency on own costs of casting manufac- ture was estimated.

  12. Flexible Software Solution for Information System of Maintenance and Repair in Armenian NPP Medzamor

    International Nuclear Information System (INIS)

    Stoilova Yordanova, V.; Manchev, B.

    2016-01-01

    Achieving high performance in maintenance and repair activities in nuclear facilities and good results in this area is not possible without proper planning. This includes long-term, medium-term and annual planning. A computerized information maintenance management system is a tool widely used by nuclear operators to achieve safe, reliable, stable and predictable plant operation. Development and implementation of such a system in the Armenian NPP Medzamor (ANPP) was initiated by the European Commission (EC) in August 2013 based on the decision of ANPP management to improve practice in terms of planning and carrying out maintenance and repair of plant structures, systems and components (SSCs). The main purpose for the development and deployment of information maintenance management system in ANPP is creation of a systematic approach to the distribution of tasks between the maintenance personnel as well as the timing and methods of their implementation - on which systems, structures and components, maintenance frequency, while the ultimate goal is to optimize the use of resources for maintenance and to ensure plant safe operation and reliability. In November 2013 a contract between European Commission and consortium Risk Engineering -David Holding was signed, including the following supplies: Hardware for the information system of ANPP (called us Archimed MRO); Specification, design and development of the software of Archimed MRO, installation of the system, data migration, training of ANPP staff operating the system, and 9 months trial operation. In the process of specifying the functionality of the system the main purpose was to provide modern information tools to help improve the work of ANPP personnel in the following areas: Optimization of ANPP maintenance program; Planning of maintenance, repair and overhaul (MRO) activities; Effective management of the processes of MRO; Analysis of the MRO results (trend analysis, recurrence of repairs, quality of the repairs

  13. Military personnel recognition system using texture, colour, and SURF features

    Science.gov (United States)

    Irhebhude, Martins E.; Edirisinghe, Eran A.

    2014-06-01

    This paper presents an automatic, machine vision based, military personnel identification and classification system. Classification is done using a Support Vector Machine (SVM) on sets of Army, Air Force and Navy camouflage uniform personnel datasets. In the proposed system, the arm of service of personnel is recognised by the camouflage of a persons uniform, type of cap and the type of badge/logo. The detailed analysis done include; camouflage cap and plain cap differentiation using gray level co-occurrence matrix (GLCM) texture feature; classification on Army, Air Force and Navy camouflaged uniforms using GLCM texture and colour histogram bin features; plain cap badge classification into Army, Air Force and Navy using Speed Up Robust Feature (SURF). The proposed method recognised camouflage personnel arm of service on sets of data retrieved from google images and selected military websites. Correlation-based Feature Selection (CFS) was used to improve recognition and reduce dimensionality, thereby speeding the classification process. With this method success rates recorded during the analysis include 93.8% for camouflage appearance category, 100%, 90% and 100% rates of plain cap and camouflage cap categories for Army, Air Force and Navy categories, respectively. Accurate recognition was recorded using SURF for the plain cap badge category. Substantial analysis has been carried out and results prove that the proposed method can correctly classify military personnel into various arms of service. We show that the proposed method can be integrated into a face recognition system, which will recognise personnel in addition to determining the arm of service which the personnel belong. Such a system can be used to enhance the security of a military base or facility.

  14. Expert System Model for Educational Personnel Selection

    Directory of Open Access Journals (Sweden)

    Héctor A. Tabares-Ospina

    2013-06-01

    Full Text Available The staff selection is a difficult task due to the subjectivity that the evaluation means. This process can be complemented using a system to support decision. This paper presents the implementation of an expert system to systematize the selection process of professors. The management of software development is divided into 4 parts: requirements, design, implementation and commissioning. The proposed system models a specific knowledge through relationships between variables evidence and objective.

  15. Performance management system enhancement and maintenance

    Science.gov (United States)

    Cleaver, T. G.; Ahour, R.; Johnson, B. R.

    1984-01-01

    The research described in this report concludes a two-year effort to develop a Performance Management System (PMS) for the NCC computers. PMS provides semi-automated monthly reports to NASA and contractor management on the status and performance of the NCC computers in the TDRSS program. Throughout 1984, PMS was tested, debugged, extended, and enhanced. Regular PMS monthly reports were produced and distributed. PMS continues to operate at the NCC under control of Bendix Corp. personnel.

  16. Automobile Starting and Lighting System Maintenance Training ...

    African Journals Online (AJOL)

    The purpose of this study is to develop automobile starting and lighting system maintenance training manual for technical college students. Research and Development (R and D) design was adopted for the study. The population of the study is 348, comprising of 76 auto-mechanics teachers, 36 automobile supervisors and ...

  17. Implementation of a Computerized Maintenance Management System

    Science.gov (United States)

    Shen, Yong-Hong; Askari, Bruce

    1994-01-01

    A primer Computerized Maintenance Management System (CMMS) has been established for NASA Ames pressure component certification program. The CMMS takes full advantage of the latest computer technology and SQL relational database to perform periodic services for vital pressure components. The Ames certification program is briefly described and the aspects of the CMMS implementation are discussed as they are related to the certification objectives.

  18. Optimum policies for a system with general imperfect maintenance

    International Nuclear Information System (INIS)

    Sheu, S.-H.; Lin, Y.-B.; Liao, G.-L.

    2006-01-01

    This study considers periodic preventive maintenance policies, which maximizes the availability of a repairable system with major repair at failure. Three types of preventive maintenance are performed, namely: imperfect preventive maintenance (IPM), perfect preventive maintenance (PPM) and failed preventive maintenance (FPM). The probability that preventive maintenance is perfect depends on the number of imperfect maintenances conducted since the previous renewal cycle, and the probability that preventive maintenance remains imperfect is not increasing. The optimum preventive maintenance time that maximizes availability is derived. Various special cases are considered. A numerical example is given

  19. Air Force Integrated Personnel and Pay System (AFIPPS)

    Science.gov (United States)

    2016-03-01

    Technical Guidance to include Information Technolgy (IT) Standards identified in the Technical View One (1) (TV-1) and implementation guidance of GIG...Compliant with Global Information Grid (GIG) Technical Guidance to include Information Technolgy (IT) Standards identified in the Technical View One...2016 Major Automated Information System Annual Report Air Force Integrated Personnel and Pay System (AFIPPS) Defense Acquisition Management

  20. Project Management of a personnel radiation records computer system

    International Nuclear Information System (INIS)

    Labenski, T.

    1984-01-01

    Project Management techniques have been used to develop a data base management information system to provide storage and retrieval of personnel radiation and Health Physics records. The system is currently being developed on a Hewlett Packard 1000 Series E Computer with provisions to include plant radiation survey information, radiation work permit information, inventory management for Health Physics supplies and instrumentation, and control of personnel access to radiological controlled areas. The methodologies used to manage the overall project are presented along with selection and management of software vendors

  1. Development of personnel exposure management system with personal computer

    International Nuclear Information System (INIS)

    Yamato, Ichiro; Yamamoto, Toshiki

    1992-01-01

    In nuclear power plants, large scale personnel exposure management systems have been developed and established by utilities. Though being common in the base, the implementations are specific by plants. Contractors must control their workers' exposures by their own methods and systems. To comply with the utilities' parental systems, contractors' systems tend to differ by plants, thus make it difficult for contractors to design a standard system that is common to all relevant plants. Circumstances being as such, however, we have developed a system which is applicable to various customer utilities with minimal variations, using personal computers with database management and data communication softwares, with relatively low cost. We hope that this system will develop to the standard model for all Japanese contractors' personnel exposure management systems. (author)

  2. Selecting personnel to work on the interactive graphics system

    International Nuclear Information System (INIS)

    Norton, F.J.

    1979-01-01

    The paper established criteria for the selection of personnel to work on the interactive graphics system and mentions some of human behavioral patterns that are created by the implementation of graphic systems. Some of the social and educational problems associated with the interactive graphics system will be discussed. The project also provided for collecting objective data which would be useful in assessing the benefits of interactive graphics systems

  3. Selecting personnel to work on the interactive graphics system

    Energy Technology Data Exchange (ETDEWEB)

    Norton, F.J.

    1979-11-30

    The paper established criteria for the selection of personnel to work on the interactive graphics system and mentions some of human behavioral patterns that are created by the implementation of graphic systems. Some of the social and educational problems associated with the interactive graphics system will be discussed. The project also provided for collecting objective data which would be useful in assessing the benefits of interactive graphics systems.

  4. Are air-conditioning maintenance personnel at increased risk of Legionellosis?

    Science.gov (United States)

    Goldman, W D; Marr, J S

    1980-07-01

    We surveyed by use of medical questionnaires and blood tests 21 maintenance workers involved with cleaning and servicing cooling towers and evaporative condensers at a large company to determine the frequency of pneumonia and antibody levels against Legionella pneumophila serogroup 1. The 21 high-risk workers were compared with 27 low-risk workers, persons who were not directly involved in service or maintenance for the company. The overall prevalence of titers greater than or equal to 128 for the 21 high-risk workers was 19.0% compared with 22.2% for the low-risk group. There were no significant differences in the history of pneumonia between these groups. Possible explanations for these findings are discussed.

  5. The application of utility analysis processes to estimate the impact of training for nuclear maintenance personnel

    International Nuclear Information System (INIS)

    Groppel, C.F.

    1991-01-01

    The primary objectives of this study were to test two utility analysis models, the Cascio-Ramos Estimate of Performance in Dollars (CREPID) model and Godkewitsch financial utility analysis model and to determine their appropriateness as tools for evaluating training. This study was conducted in conjunction with Philadelphia Electric Company's Nuclear Training Group. Job performance of nuclear maintenance workers was assessed to document the impact of the training program. Assessment of job performance covered six job performance themes. Additionally, front-line nuclear maintenance supervisors were interviewed to determine their perceptions of the nuclear maintenance training. A comparison of supervisor's perceptions and outcomes of the utility analysis models was made to determine the appropriateness of utility analysis as quantitative tools for evaluating the nuclear maintenance training program. Application of the CREPID utility analysis model indicated the dollar value of the benefits of training through utility analysis was $5,843,750 which represented only four of the job performance themes. Application of the Godkewitsch utility analysis model indicated the dollar value of the benefits of training was $3,083,845 which represented all six performance themes. A comparison of the outcomes indicated a sizeable difference between the dollar values produced by the models. Supervisors indicated training resulted in improved productivity, i.e., improved efficiency and effectiveness. Additionally, supervisors believed training was valuable because it provided nonmonetary benefits, e.g., improved self-esteem and confidence. The application of utility analysis addressed only monetary benefits of training. The variation evidenced by the difference in the outcome of the two models suggests that utility analysis open-quotes estimatesclose quotes may not accurately reflect the impact of training

  6. The training system for technical personnel of producers

    International Nuclear Information System (INIS)

    Kleiner, E.

    1980-01-01

    The training system of BBC Mannheim for technical personnel is divided in different activities, according to the different target groups and tenors. Different departments take care of this activities, which supply one another. Problem, training activities and methods are described. (orig.) [de

  7. Method of Competence System Estimation for the Ukrainian NPP Personnel

    International Nuclear Information System (INIS)

    Gushchyna, Maryna

    2014-01-01

    Conclusions: • During the research the scale allowing assessing the influence of personnel competences and infrastructure on the enterprise safety culture level was developed. • The scale was approved on the statistical data characterizing industrial traumatism on the enterprises of atomic power and atomic industrial complex. • The proposed scale allows receiving system estimation of the safety culture level

  8. A passive automated personnel accountability system for reactor emergency preparedness

    International Nuclear Information System (INIS)

    Zimmerman, R.O.; DeLisle, G.V.; Hickey, E.E.

    1988-04-01

    In 1985 a project was undertaken at the N Reactor on the Hanford Site to develop an automated personnel accountability system to ensure accountability of all personnel within 30 minutes of a site evacuation. The decision to develop such a system was made after a full-scale evacuation drill showed that the manual accountability system in use at the time was inadequate to meet the 30-minute requirement. Accountability systems at commercial nuclear power plants were evaluated, but found to be unsuitable because they were not passive, that is, they required action on part of the user for the system to work. Approximately 2500 people could be required to evacuate the 100-N Area. Therefore, a card key system or badge exchange system was judged not to be feasible. A passive accountability system was desired for N Reactor to allow personnel to enter and leave the site in a more timely manner. To meet the need for an automated accountability system at N Reactor, a special Evacuation Accountability System (EVACS) was designed and developed. The EVACS system has three basic components: the transponder, a credit card-sized device worn with the security badge; portal monitors, which are electronically activated by the transponder; and a computer information system that contains the personnel data base. Each person wearing a transponder is accounted for automatically by walking through a portal. In this paper, a description of the hardware and software will be presented, together with problems encountered and lessons learned while adapting an existing technology to this particular use. The system is currently installed and requires acceptance testing before becoming operational

  9. Condition-based maintenance for complex systems : Coordinating maintenance and logistics planning for the process industries

    NARCIS (Netherlands)

    Olde Keizer, Minou Catharina Anselma

    2016-01-01

    Maintenance planning in the process industries is extremely complex for various reasons. Plants often run nonstop, allowing little time for performing preventive maintenance. Failures should be prevented, however, as they can lead to system downtime and high losses of revenue. Corrective maintenance

  10. Equipment Maintenance management support system based on statistical analysis of maintenance history data

    International Nuclear Information System (INIS)

    Shimizu, S.; Ando, Y.; Morioka, T.

    1990-01-01

    Plant maintenance is recently becoming important with the increase in the number of nuclear power stations and in plant operating time. Various kinds of requirements for plant maintenance, such as countermeasures for equipment degradation and saving maintenance costs while keeping up plant reliability and productivity, are proposed. For this purpose, plant maintenance programs should be improved based on equipment reliability estimated by field data. In order to meet these requirements, it is planned to develop an equipment maintenance management support system for nuclear power plants based on statistical analysis of equipment maintenance history data. The large difference between this proposed new method and current similar methods is to evaluate not only failure data but maintenance data, which includes normal termination data and some degree of degradation or functional disorder data for equipment and parts. So, it is possible to utilize these field data for improving maintenance schedules and to evaluate actual equipment and parts reliability under the current maintenance schedule. In the present paper, the authors show the objectives of this system, an outline of this system and its functions, and the basic technique for collecting and managing of maintenance history data on statistical analysis. It is shown, from the results of feasibility tests using simulation data of maintenance history, that this system has the ability to provide useful information for maintenance and the design enhancement

  11. Human cognitive task distribution model for maintenance support system of a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Park, Young Ho

    2007-02-15

    In human factors research, more attention has been devoted to the operation of nuclear power plants (NPPs) than to their maintenance. However, human error related to maintenance is 45% among the total human errors from 1990 to 2005 in Korean nuclear power plants. Therefore, it is necessary to study human factors in the maintenance of an NPP. There is a current trend toward introducing digital technology into both safety and non-safety systems in NPPs. A variety of information about plant conditions can be used digitally. In the future, maintenance support systems will be developed based on an information-oriented NPP. In this context, it is necessary to study the cognitive tasks of the personnel involved in maintenance and the interaction between the personnel and maintenance support systems. The fundamental purpose of this work is how to distribute the cognitive tasks of the personnel involved in the maintenance in order to develop a maintenance support system that considers human factors. The second purpose is to find the causes of errors due to engineers or maintainers and propose system functions that are countermeasures to reduce these errors. In this paper, a cognitive task distribution model of the personnel involved in maintenance is proposed using Rasmussen's decision making model. First, the personnel were divided into three groups: the operators (inspectors), engineers, and maintainers. Second, human cognitive tasks related to maintenance were distributed based on these groups. The operators' cognitive tasks are detection and observation; the engineers' cognitive tasks are identification, evaluation, target state, select target, and procedure: and the maintainers' cognitive task is execution. The case study is an analysis of failure reports related to human error in maintenance over a period of 15years. By using error classification based on the information processing approach, the human errors involved in maintenance were classified

  12. Human cognitive task distribution model for maintenance support system of a nuclear power plant

    International Nuclear Information System (INIS)

    Park, Young Ho

    2007-02-01

    In human factors research, more attention has been devoted to the operation of nuclear power plants (NPPs) than to their maintenance. However, human error related to maintenance is 45% among the total human errors from 1990 to 2005 in Korean nuclear power plants. Therefore, it is necessary to study human factors in the maintenance of an NPP. There is a current trend toward introducing digital technology into both safety and non-safety systems in NPPs. A variety of information about plant conditions can be used digitally. In the future, maintenance support systems will be developed based on an information-oriented NPP. In this context, it is necessary to study the cognitive tasks of the personnel involved in maintenance and the interaction between the personnel and maintenance support systems. The fundamental purpose of this work is how to distribute the cognitive tasks of the personnel involved in the maintenance in order to develop a maintenance support system that considers human factors. The second purpose is to find the causes of errors due to engineers or maintainers and propose system functions that are countermeasures to reduce these errors. In this paper, a cognitive task distribution model of the personnel involved in maintenance is proposed using Rasmussen's decision making model. First, the personnel were divided into three groups: the operators (inspectors), engineers, and maintainers. Second, human cognitive tasks related to maintenance were distributed based on these groups. The operators' cognitive tasks are detection and observation; the engineers' cognitive tasks are identification, evaluation, target state, select target, and procedure: and the maintainers' cognitive task is execution. The case study is an analysis of failure reports related to human error in maintenance over a period of 15years. By using error classification based on the information processing approach, the human errors involved in maintenance were classified

  13. Toward a Comprehensive System of Personnel Development in Deafblind Education.

    Science.gov (United States)

    Parker, Amy T; Nelson, Catherine

    2016-01-01

    Students who are deafblind are a unique population with unique needs for learning, communication, and environmental access. Two roles have been identified as important to their education: teacher of the deafblind and intervener. However, these roles are not officially recognized in most states. Because of this lack of recognition and the low incidence of deafblindness, it is difficult to sustain systems that prepare highly qualified personnel with advanced training and knowledge in educational strategies for children and youth who are deafblind. The authors propose a comprehensive system of personnel development (CSPD) for deafblind education. The components of this system are standards, preservice training, in-service/professional development, leadership development, research, and, finally, planning coordination, and evaluation. The authors describe elements of the model that are being implemented and provide suggestions to support the future development of a comprehensive system.

  14. The personnel dosimetry record keeping system at AEE Winfrith

    International Nuclear Information System (INIS)

    Gill, D.W.

    1979-09-01

    Since May 1978 the exposure of personnel to external radiation has been assessed by Thermoluminescent Dosimetry, (TLD). The dosemeter consists of a TLD card similar to that used by the National Radiological Protection Board, held in a plastic badge designed at AEE Winfrith, and used in conjunction with a D A Pitman Ltd Type 605 Automatic Reader. The report describes the dosemeter, the operation of the dosimetry service and the system for maintaining a computerised record keeping system. (author)

  15. Maintenance rule: a system to guarantee maintenance effectiveness

    International Nuclear Information System (INIS)

    Torralbo, J.R.

    1995-01-01

    In the last few years, maintenance activities in nuclear plants have been given prime attention in view of their repercussion on the performance of such plants. One of the results of that attention is a new rule published in the U.S. known as M aintenance Rule . The paper describes the philosophy and main guidelines of the new regulation, and presents the procedure brought into action by the nuclear industry in Spain so to make their application contribute to a real improvement of safety and performance in nuclear plants. (Author)

  16. Job analysis of the electrician position for the nuclear power plant maintenance personnel reliability model

    International Nuclear Information System (INIS)

    Federman, P.J.; Bartter, W.D.; Siegel, A.I.

    1984-02-01

    This report presents the methods, procedures, and results of the fourth and final of a series of job analytic studies which characterize maintenance positions in nuclear power plants. The electrician position is the subject of the present report. The characterization of the electrician position takes the form of detailed information about: (1) the frequency of performing various tasks, (2) the time required for performing each task, (3) the training required for adequate performance of each task, and (4) the perceived consequences resulting from inadequate task performance. Additionally, information is presented about the intellective and the perceptual-motor loading imposed by each task. This information contributes to job design and training requirements derivation as well as to the assessment of human performance reliability in nuclear power plants

  17. The ITER Remote Maintenance Management System

    International Nuclear Information System (INIS)

    Tesini, Alessandro; Rolfe, A.C.

    2009-01-01

    A major challenge for the ITER project is to develop and implement a Remote Maintenance System, which can deliver high Tokamak availability within the constraints of the overall ITER programme objectives. Much of the maintenance of ITER will be performed using remote handling methods and some with combined manual and remote activities working together. The organization and management of the ITER remote handling facilities will be of a scale unlike any other remote handling application in the world. The ITER remote handling design and procurement activities will require co-ordination and management across many different sites throughout the world. It will be a major challenge for the ITER project to ensure a consistent quality and technical approach in all of the contributing parties. To address this issue the IO remote handling team are implementing the ITER Maintenance Management Plan (IMMP) comprising an overarching document defining the policies and methodologies (ITER Remote Maintenance Management System or IMMS) and an associated ITER remote handling code of practise (IRHCOP). The IMMS will be in document form available as a pdf file or similar. The IRHCOP will be implemented as a web based application and will provide access to the central resource of the entire code of practise from any location in the world. The IRHCOP data library will be centrally controlled in order that users can be assured of the data relevance and authenticity. This paper will describe the overall approach being taken to deal with this challenge and go on to detail the structure and content of both the IMMS and the IRHCOP.

  18. Quality upgrading and cost reducing effects of using an operation control system for performance of maintenance tasks

    International Nuclear Information System (INIS)

    Ramler, K.

    1996-01-01

    According to available results, the use of an operation control system has come up to expections with respect to a quality enhancement of maintenance work. The tasks are performed more safely and there is more insight into the processes. so that, as indirect results, cost savings and rationalisation effects are to be expected. However, the cost savings achieved through the operation control system for maintenance tasks will remain modest. The truly cost-effective optimisation potentials in the maintenance area primarily consist in a reduction of preventive measures to the required scope, i.e reduction of the envisaged quantity of processes for maintenance and recurrent inspection. In order to extend savings to the organisational level, with respect to personnel expenditure, by DP supported maintenance planning, a suitable optimisation of the organisational structure and personnel employment is inevitable, because otherwise the rationalisation potentials will remain utopia. (orig.) [de

  19. 34 CFR 361.18 - Comprehensive system of personnel development.

    Science.gov (United States)

    2010-07-01

    ... implementation of a plan to address the current and projected needs for personnel who are qualified in accordance... accordance with paragraph (c) of this section, including personnel from minority backgrounds and personnel... retraining, recruiting, and hiring personnel; (B) The specific time period by which all State unit personnel...

  20. The calibration procedures in the Studsvik standardized personnel dosimetry system

    International Nuclear Information System (INIS)

    Widell, C.O.

    1978-01-01

    Every large nuclear installation in Sweden reads its own personnel TLDs. In order to supervise this decentralized reading of dose meters, the TLD readers are connected by telephone lines to a central computer for dose registration. This computer is used both for registering the personnel doses and for checking the TLD readers. This checking is performed by the use of pre-irradiated calibration dose meters which are always used when a batch of personnel dose meters are read. The pre-irradiated dose meters are either irradiated using 137 Cs to various doses up to 100mSv(10000mrem) or using a 90 Sr source in a reference dose irradiator to a dose equal to 3mSv(300mrem) from a 137 Cs source. The results from the reading of the pre-irradiated dose meters are processed by the computer and a calibration factor is calculated. The calibration factor is automatically used to calculate the doses to the personnel TLD's. However, if the calibration factor deviates by more than 10% from the previously used factor, this fact is shown to the operator - who then has to decide what calibration factor is going to be used. This calibration and supervisory procedure together with the safety interlocks in the TLD readers has resulted in a very reliable and accurate dosimetry system. (author)

  1. The Martin Marietta Energy Systems personnel neutron dosimetry program

    International Nuclear Information System (INIS)

    McMahan, K.L.

    1991-01-01

    Martin Marietta Energy Systems, Inc. (Energy Systems), manages five sites for the US Department of Energy. Personnel dosimetry for four of the five sites is coordinated through a Centralized External Dosimetry System (CEDS). These four sites are the Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant (Y-12), the Oak Ridge K-25 Site (K-25), and the Paducah Gaseous Diffusion Plant (PGDP). The fifth Energy Systems site, Portsmouth Gaseous Diffusion Plant, has an independent personnel dosimetry program. The current CEDS personnel neutron dosimeter was first issued in January 1989, after an evaluation and characterization of the dosimeters' response in the workplaces was performed. For the workplace characterization, Energy Systems contracted with Pacific Northwest Laboratory (PNL) to perform neutron measurements at selected locations at ORNL and Y-12. K-25 and PGDP were not included because their neutron radiation fields were similar to others already planned for characterization at ORNL and Y-12. Since the initial characterization, PNL has returned to Oak Ridge twice to perform follow up measurements, and another visit is planned in the near future

  2. Building Maintenance Management System for Heritage Museum

    OpenAIRE

    Md Azree Othuman Mydin; Siti Hajar Ismail; Norhidayah Md Ulang

    2012-01-01

    An investment in the building maintenance aspect is massive throughout the world. In most of the countries, it signifies approximately 50% of the entire revenue of the construction industry. The value of buildings depends on the eminence of the maintenance invested in them. Maintenance management engages obtaining utmost advantage from the investment made on the maintenance activities. At the moment, maintenance in buildings in Malaysia is on the increase in spite of size, ...

  3. [Maintenance and monitoring of water treatment system].

    Science.gov (United States)

    Pontoriero, G; Pozzoni, P; Tentori, F; Scaravilli, P; Locatelli, F

    2005-01-01

    Water treatment systems must be submitted to maintenance, disinfections and monitoring periodically. The aim of this review is to analyze how these processes must complement each other in order to preserve the efficiency of the system and optimize the dialysis fluid quality. The correct working of the preparatory process (pre-treatment) and the final phase of depuration (reverse osmosis) of the system need a periodic preventive maintenance and the regular substitution of worn or exhausted components (i.e. the salt of softeners' brine tank, cartridge filters, activated carbon of carbon tanks) by a competent and trained staff. The membranes of reverse osmosis and the water distribution system, including dialysis machine connections, should be submitted to dis-infections at least monthly. For this purpose it is possible to use chemical and physical agents according to manufacturer' recommendations. Each dialysis unit should predispose a monitoring program designed to check the effectiveness of technical working, maintenance and disinfections and the achievement of chemical and microbiological standards taken as a reference. Generally, the correct composition of purified water is monitored by continuous measuring of conductivity, controlling bacteriological cultures and endotoxin levels (monthly) and checking water contaminants (every 6-12 months). During pre-treatment, water hardness (after softeners) and total chlorine (after chlorine tank) should be checked periodically. Recently the Italian Society of Nephrology has developed clinical guidelines for water and dialysis solutions aimed at suggesting rational procedures for production and monitoring of dialysis fluids. It is hopeful that the application of these guidelines will lead to a positive cultural change and to an improvement in dialysis fluid quality.

  4. Virtual maintenance technology for reactor system based on PPR technology

    International Nuclear Information System (INIS)

    Wu Yaxiang; Ma Baiyong

    2009-01-01

    Based on the Product, Process and Resources (PPR) technology, the establishing technology of virtual maintenance environment for the reactor system and the process structure tree for virtual maintenance is studied, and the flow for the maintainability design and simulation for reactor system is put forward. Based on the subsection simulation of maintenance process and layered design of maintenance actions, the leveled structure of the reactor system virtual maintenance task is studied. The relation for the data of product, process and resource is described by Plan Evaluation and Review Technology (PERT) diagram to define the maintenance operation. (authors)

  5. MOTIVATION AND STIMULATION SYSTEM OF THE PERSONNEL OF INDUSTRIAL ENTERPRISES

    Directory of Open Access Journals (Sweden)

    Aliona Klymchuk

    2016-03-01

    Full Text Available This article is devoted to the problems of studying the system of motivation and stimulation of personnel at the industrial enterprises, which are important in today's conditions. The purpose of the study is a detailed analysis of system characteristics and motivation of personnel at the enterprises. It is proved that the enterprise's management must constantly deal with the improvement of the system of motivation and stimulation of personnel, that should be adapted to the new conditions for the market functioning. The author notes that the system of motivation and stimulation at the industrial enterprises is effectively connected with the problem of production activities at the enterprise and the final results of its operations increasing and the living standards of workers improving. In the article the basic functions (attracting qualified specialists, preservation groups of professionals within the required time limit, which must perform a system of motivation and stimulation of the personnel at the enterprise are determined. The main tasks that are necessary to ensure the desired level of labor activity of personnel are formed: determining a set of values that should form the basis of personnel motivation; needs formation of each employee, his interests and capabilities of pleasure; specification of the types of work that require the enterprise and that it is advisable to motivate; labour organization so as to convince the employee's ability to satisfy its interests; coordination of certain types of worker with a set of values and preferences; clarify the motives, interests and values when hiring an employee at the enterprise. In order, to form the control system of motivation and stimulation, the need for the following conditions are stressed: availability of complete and accurate information about equipment management; the need to have permanent representation on the status and dynamics of the motivational orientation of personnel

  6. ITER Remote Maintenance System (IRMS) lifecycle management

    Energy Technology Data Exchange (ETDEWEB)

    Tesini, Alessandro, E-mail: alessandro.tesini@iter.org [ITER Organization, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Otto' , Bede [Oxford Technologies Ltd, 7, Nuffield Way, Abingdon, Oxon OX14 1RJ (United Kingdom); Blight, John [FAAST 31c Allee de la Granette, 13600 Ceyreste (France); Choi, Chang-Hwan; Friconneau, Jean-Pierre; Gotewal, Krishan Kumar; Hamilton, David [ITER Organization, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Heckendorn, Frank [FD Technologies, PO Box 6686, Aiken, SC (United States); Martins, Jean-Pierre [ITER Organization, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Marty, Thomas [Westinghouse, 122, avenue de Hambourg, 13008 Marseille (France); Nakahira, Masataka; Palmer, Jim; Subramanian, Rajendran [ITER Organization, CS 90 046, 13067 St. Paul Lez Durance Cedex (France)

    2011-10-15

    The availability of the ITER machine to perform its scientific program is strongly dependent on the performance of the different Remote Handling (RH) systems constituting the ITER Remote Maintenance System (IRMS). The lifecycle of the IRMS will largely exceed 40 years from initial concept design and proof testing through to machine decommissioning. Such a long lifecycle requires that a rigorous approach is put in place to guarantee the technical capabilities of the highly innovative IRMS, its efficiency and its availability. For this purpose, an IRMS System Engineering and IRMS lifecycle management approach has been adopted by ITER. The approach aims at ensuring the IRMS full operability and availability at an acceptable cost of ownership over the full ITER machine assembly and operations period. The IRMS lifecycle management method described in this paper covers such subjects as specific requirements for IRMS design reviews, monitoring during manufacture, factory and site acceptance testing, integrated commissioning, decontamination, maintenance and re-qualification strategies, requirements for Integrated Logistical Support during operations. The updating and implementation of the IRMS lifecycle strategy and this procedure will be managed and monitored by the Remote Handling Integrated Product Team (RH-IPT). Although developed for the IRMS, the basic principles and procedures of lifecycle management could be applied to other ITER plant systems whose reliability and availability will be essential for the continued operation of the ITER machine.

  7. ITER Remote Maintenance System (IRMS) lifecycle management

    International Nuclear Information System (INIS)

    Tesini, Alessandro; Otto', Bede; Blight, John; Choi, Chang-Hwan; Friconneau, Jean-Pierre; Gotewal, Krishan Kumar; Hamilton, David; Heckendorn, Frank; Martins, Jean-Pierre; Marty, Thomas; Nakahira, Masataka; Palmer, Jim; Subramanian, Rajendran

    2011-01-01

    The availability of the ITER machine to perform its scientific program is strongly dependent on the performance of the different Remote Handling (RH) systems constituting the ITER Remote Maintenance System (IRMS). The lifecycle of the IRMS will largely exceed 40 years from initial concept design and proof testing through to machine decommissioning. Such a long lifecycle requires that a rigorous approach is put in place to guarantee the technical capabilities of the highly innovative IRMS, its efficiency and its availability. For this purpose, an IRMS System Engineering and IRMS lifecycle management approach has been adopted by ITER. The approach aims at ensuring the IRMS full operability and availability at an acceptable cost of ownership over the full ITER machine assembly and operations period. The IRMS lifecycle management method described in this paper covers such subjects as specific requirements for IRMS design reviews, monitoring during manufacture, factory and site acceptance testing, integrated commissioning, decontamination, maintenance and re-qualification strategies, requirements for Integrated Logistical Support during operations. The updating and implementation of the IRMS lifecycle strategy and this procedure will be managed and monitored by the Remote Handling Integrated Product Team (RH-IPT). Although developed for the IRMS, the basic principles and procedures of lifecycle management could be applied to other ITER plant systems whose reliability and availability will be essential for the continued operation of the ITER machine.

  8. Rotating Machinery Predictive Maintenance Through Expert System

    Directory of Open Access Journals (Sweden)

    M. Sarath Kumar

    2000-01-01

    Full Text Available Modern rotating machines such as turbomachines, either produce or absorb huge amount of power. Some of the common applications are: steam turbine-generator and gas turbine-compressor-generator trains produce power and machines, such as pumps, centrifugal compressors, motors, generators, machine tool spindles, etc., are being used in industrial applications. Condition-based maintenance of rotating machinery is a common practice where the machine's condition is monitored constantly, so that timely maintenance can be done. Since modern machines are complex and the amount of data to be interpreted is huge, we need precise and fast methods in order to arrive at the best recommendations to prevent catastrophic failure and to prolong the life of the equipment. In the present work using vibration characteristics of a rotor-bearing system, the condition of a rotating machinery (electrical rotor is predicted using an off-line expert system. The analysis of the problem is carried out in an Object Oriented Programming (OOP framework using the finite element method. The expert system which is also developed in an OOP paradigm gives the type of the malfunctions, suggestions and recommendations. The system is implemented in C++.

  9. Planning and control of maintenance systems modelling and analysis

    CERN Document Server

    Duffuaa, Salih O

    2015-01-01

    Analyzing maintenance as an integrated system with objectives, strategies and processes that need to be planned, designed, engineered, and controlled using statistical and optimization techniques, the theme of this book is the strategic holistic system approach for maintenance. This approach enables maintenance decision makers to view maintenance as a provider of a competitive edge not a necessary evil. Encompassing maintenance systems; maintenance strategic and capacity planning, planned and preventive maintenance, work measurements and standards, material (spares) control, maintenance operations and control, planning and scheduling, maintenance quality, training, and others, this book gives readers an understanding of the relevant methodology and how to apply it to real-world problems in industry. Each chapter includes a number exercises and is suitable as a textbook or a reference for a professionals and practitioners whilst being of interest to industrial engineering, mechanical engineering, electrical en...

  10. Educational systems - educational qualification of nuclear power plant personnel

    International Nuclear Information System (INIS)

    Boeger, H.

    1986-01-01

    In this lecture the following common features of education and training systems are described: - description of general school education, vocational training and engineering study programs, - allocation of categories of activities to normal school training backgrounds, - recommendations for educational and training programs required for various positions in nuclear power plants (formal and on-the-job training), - examinations and licences for the personnel at nuclear power plants. (orig./GL)

  11. An automated neutron monitor maintenance system

    International Nuclear Information System (INIS)

    Moore, F.S.; Griffin, J.C.; Odell, D.M.C.

    1996-01-01

    Neutron detectors are commonly used by the nuclear materials processing industry to monitor fissile materials in process vessels and tanks. The proper functioning of these neutron monitors must be periodically evaluated. We have developed and placed in routine use a PC-based multichannel analyzer (MCA) system for on-line BF3 and He-3 gas-filled detector function testing. The automated system: 1) acquires spectral data from the monitor system, 2) analyzes the spectrum to determine the detector's functionality, 3) makes suggestions for maintenance or repair, as required, and 4) saves the spectrum and results to disk for review. The operator interface has been designed to be user-friendly and to minimize the training requirements of the user. The system may also be easily customized for various applications

  12. Development techniques of computerized maintenance Management system

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Yon Woo; Kim, S D; Soong, W S; Kim, G H; Oh, W H; Kim, Y G

    2000-05-01

    Normal operation of the facility is one of the key factors in the accomplishments of research goals. As confirmed by a case study of the influence of the facility operation condition on the research results, emphasis should be put on the facility preserve management. Facilities should be maintained in solid operational condition and their malfunctions should be repaired as soon as possible. The purpose of this project is to make propositions on the development of the facility preserve management system which is to maximize the efficiency of the budget execution, manpower organization and maintenance planning, and is to minimize the duration of the operational pause due to malfunctions with the least disbursement.

  13. Development techniques of computerized maintenance Management system

    International Nuclear Information System (INIS)

    Oh, Yon Woo; Kim, S.D.; Soong, W.S.; Kim, G.H.; Oh, W.H.; Kim, Y.G.

    2000-05-01

    Normal operation of the facility is one of the key factors in the accomplishments of research goals. As confirmed by a case study of the influence of the facility operation condition on the research results, emphasis should be put on the facility preserve management. Facilities should be maintained in solid operational condition and their malfunctions should be repaired as soon as possible. The purpose of this project is to make propositions on the development of the facility preserve management system which is to maximize the efficiency of the budget execution, manpower organization and maintenance planning, and is to minimize the duration of the operational pause due to malfunctions with the least disbursement

  14. In-vessel maintenance remote manipulator system

    International Nuclear Information System (INIS)

    Jimenez, E.

    1978-01-01

    The radiation environment within the Tokamak Fusion Test Reactor (TFTR) vacuum vessel necessitates the development of a Remote Manipulator System (RMS) to perform required periodic inspection and maintenance tasks. The RMS must be able to perform dexterous operations and handle loads that exceed human capabilities. The limited size of the access ports on the TFTR vacuum vessel and the performance profile, defined by the various handling requirements, present unique design constraints. The design approach and formulation of a RMS configuration which satisfies TFTR requirements is presented herein

  15. Determining the lower limit of detection for personnel dosimetry systems

    International Nuclear Information System (INIS)

    Roberson, P.L.; Carlson, R.D.

    1992-01-01

    A simple method for determining the lower limit of detection (LLD) for personnel dosimetry systems is described. The method relies on the definition of a critical level and a detection level. The critical level is the signal level above which a result has a small probability of being due to a fluctuation of the background. All results below the critical level should not be reported as an indication of a positive result. The detection level is the net signal level (i.e., dose received) above which there is a high confidence that a true reading will be detected and reported as a qualitatively positive result. The detection level may be identified as the LLD. A simple formula is derived to allow the calculation of the LLD under various conditions. This type of formula is being used by the Department of Energy Laboratory Accreditation Program (DOELAP) for personnel dosimetry. Participants in either the National Voluntary Laboratory Accreditation Program (NVLAP) for personnel dosimetry or DOELAP can use performance test results along with a measurement of background levels to estimate the LLDs for their dosimetry system. As long as they maintain their dosimetry system such that the LLDs are less than half the lower limit of the NVLAP or DOELAP test exposure ranges, dosimetry laboratories can avoid testing failures due to poor performance at very low exposures

  16. System for the quality assurance of personnel training programs

    International Nuclear Information System (INIS)

    Rjona, Orison; Venegas, Maria del C.; Rodriguez, Lazaro; Lopez, Miguel A.; Armenteros, Ana L.

    1999-01-01

    In this work are described the fundamental possibilities and characteristics of a software that allows to carry out the management and automatic evaluation of all data gotten during jobs analysis and design, development, implementation and evaluation of personnel training programs of nuclear and radioactive installations and risk industries. The system that is introduced, GESAT, proportion a tool of centralized managerial control of training data and the obtaining of the quality objectives of each installation in the training of their personnel. GESAT includes all phases of SAT method (Systematic Approach to Training). It constitutes the necessary practical support for the elaboration, implementation and evaluation of training programs, allowing the establishment of restrictions and controls and avoiding inconsistencies in the process. It offers the possibility of automatic evaluation that identify fundamental deficiencies in the planning and implementation of training programs. This evaluation facilitates the systematic feed back and the continuous improvement of the training programs.(author)

  17. Louisiana DOTD maintenance budget allocation system: final report.

    Science.gov (United States)

    2002-11-01

    This project developed a computer system to assist Louisiana Department of Transportation and Development (LA DOTD) maintenance managers in the preparation of zero-based, needs-driven annual budget plans for routine maintenance. This includes pavemen...

  18. Modular reliability modeling of the TJNAF personnel safety system

    International Nuclear Information System (INIS)

    Cinnamon, J.; Mahoney, K.

    1997-01-01

    A reliability model for the Thomas Jefferson National Accelerator Facility (formerly CEBAF) personnel safety system has been developed. The model, which was implemented using an Excel spreadsheet, allows simulation of all or parts of the system. Modularity os the model's implementation allows rapid open-quotes what if open-quotes case studies to simulate change in safety system parameters such as redundancy, diversity, and failure rates. Particular emphasis is given to the prediction of failure modes which would result in the failure of both of the redundant safety interlock systems. In addition to the calculation of the predicted reliability of the safety system, the model also calculates availability of the same system. Such calculations allow the user to make tradeoff studies between reliability and availability, and to target resources to improving those parts of the system which would most benefit from redesign or upgrade. The model includes calculated, manufacturer's data, and Jefferson Lab field data. This paper describes the model, methods used, and comparison of calculated to actual data for the Jefferson Lab personnel safety system. Examples are given to illustrate the model's utility and ease of use

  19. A COMPUTER BASED MAINTENANCE MANAGEMENT SYSTEM ...

    African Journals Online (AJOL)

    ... programs to schedule for maintenance or replacement of machines has been designed such that it enables the maintenance department control all jobs associated with plant maintenance and breakdown. It predicts the time to failure of designated plants and caters for the replacement analysis of some capital equipment.

  20. Defense IRM: Alternatives Should Be Considered in Developing the New Civilian Personnel System

    National Research Council Canada - National Science Library

    1999-01-01

    ... regional centers, and attempting to improve personnel management business processes. A key part of this initiative is Defense's development of a new information management system-the Defense Civilian Personnel Data System (DCPDs...

  1. Maintenance cost models in deregulated power systems under opportunity costs

    International Nuclear Information System (INIS)

    Al-Arfaj, K.; Dahal, K.; Azaiez, M.N.

    2007-01-01

    In a centralized power system, the operator is responsible for scheduling maintenance. There are different types of maintenance, including corrective maintenance; predictive maintenance; preventive maintenance; and reliability-centred maintenance. The main cause of power failures is poor maintenance. As such, maintenance costs play a significant role in deregulated power systems. They include direct costs associated with material and labor costs as well as indirect costs associated with spare parts inventory, shipment, test equipment, indirect labor, opportunity costs and cost of failure. In maintenance scheduling and planning, the cost function is the only component of the objective function. This paper presented the results of a study in which different components of maintenance costs were modeled. The maintenance models were formulated as an optimization problem with single and multiple objectives and a set of constraints. The maintenance costs models could be used to schedule the maintenance activities of power generators more accurately and to identify the best maintenance strategies over a period of time as they consider failure and opportunity costs in a deregulated environment. 32 refs., 4 tabs., 4 figs

  2. Astro. A multimedia System for training of personnel

    International Nuclear Information System (INIS)

    Garate Abenza, M.; Mercade Seijas, O.; Munoz, J.F.; Ruiz-Andino, J.L.

    1994-01-01

    ASTRO is an integrated software package used to train system operators and is directly applicable to all types of power-generation plant operator training. The following are its salient characteristics: - Installed in work stations with multimedia capabilities a user-friendly interface - Covers various types of instruction on theory, procedure and maintenance allowing the execution of trainee-customized courses. - Includes all the phases of the teaching-learning task: compilation or creation and adaptation of course design information, execution and evaluation. - Combines the capabilities of traditional teaching tools, focusing basically on theoretical training, with the power of necessary real-time simulators for the assimilation of operation and maintenance procedures. Moreover, it provides the capacity to extract information instantly from the simulated system, without existing the simulation process. - It is run on inexpensive platforms (work stations) as compared to the traditional system of simulator training or training at site. (Author)

  3. TAX SYSTEM FOR MEMBERS OF THE PERSONNEL LIVING IN FRANCE

    CERN Document Server

    Human Resources Division

    2002-01-01

    - Declaration of income for 2001 - This text is also available on the Human Resources Division website. Important The French tax authorities have informed the Organization of certain changes to the tax system applicable to certain members of the CERN personnel residing in France. The CERN Management is currently seeking to clarify a number of points relating to the application of these measures. For the moment, members of the personnel residing in France are requested to follow the instructions outlined below and any other related instructions published later in 2002. To deal with the increasing number of requests for personal advice, the Human Resources Division has set up a Help-Desk, on 72838 (*), which will direct you to the relevant in-house or outside services. However, as the Human Resources Division cannot speak for the tax authorities and does not have the necessary resources to handle all the problems that are referred to it, members of the personnel are strongly urged to contact the Fren...

  4. Development of blanket remote maintenance system

    International Nuclear Information System (INIS)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou

    1998-01-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  5. Development of divertor remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  6. Development of blanket remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  7. Development of divertor remote maintenance system

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji

    1998-01-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  8. Selective maintenance of multi-state systems with structural dependence

    International Nuclear Information System (INIS)

    Dao, Cuong D.; Zuo, Ming J.

    2017-01-01

    This paper studies the selective maintenance problem for multi-state systems with structural dependence. Each component can be in one of multiple working levels and several maintenance actions are possible to a component in a maintenance break. The components structurally form multiple hierarchical levels and dependence groups. A directed graph is used to represent the precedence relations of components in the system. A selective maintenance optimization model is developed to maximize the system reliability in the next mission under time and cost constraints. A backward search algorithm is used to determine the assembly sequence for a selective maintenance scenario. The maintenance model helps maintenance managers in determining the best combination of maintenance activities to maximize the probability of successfully completing the next mission. Examples showing the use of the proposed method are presented. - Highlights: • A selective maintenance model for multi-state systems is proposed considering both economic and structural dependence. • Structural dependence is modeled as precedence relationship when disassembling components for maintenance. • Resources for disassembly and maintenance are evaluated using a backward search algorithm. • Maintenance strategies with and without structural dependence are analyzed. • Ignoring structural dependence may lead to over-estimation of system reliability.

  9. [A preliminary evaluation of mental status and an investigation of occupational health knowledge demand in operating and maintenance personnel in wind power plants].

    Science.gov (United States)

    Hu, S Q; Zhang, Q; Zhu, X H; Sun, K; Chen, S Z; Liu, A G; Luo, G L; Huang, W

    2016-10-20

    Objective: To investigate the mental status, level of occupational health knowledge, health behaviors, and occupational health knowledge demand in operating and maintenance personnel in wind power plants, and to provide a basis for formulating protective measures of occupational health for operating and maintenance personnel in wind power plants. Methods: A cluster sampling was performed in regionally representative wind power plants in the wind power industry from May 2014 to June 2015, and the Symptom Checklist-90 (SCL-90) and a self-made evaluation questionnaire were used to investigate the general status, mental health, and occupational health knowledge demand in 160 operating and maintenance workers. Results: Of all respondents, 26.9% had mental health issues. The awareness rate of infectious disease knowledge and preventive measures was 11.9%. Of all workers, 96.5% wanted to know the occupational hazard factors in the workplace, and 96.3% wanted to get the knowledge of the prevention of related diseases. Conclusion: Mental health issues in operating and maintenance personnel in wind power plants cannot be neglected and there is a high demand for occupational health services and related knowledge. Comprehensive intervention measures for health promotion in the workplace should be adopted to improve working environment, enhance individual mental health education, increase the level of occupational health management, and protect the health of workers.

  10. Planning of Maintenance and Repair of Complicated Technical Systems

    Directory of Open Access Journals (Sweden)

    N. I. Liseychikov

    2004-01-01

    Full Text Available It is expedient to use mathematical models for substantiation of operational material consumption at maintenance of complicated technical systems. The appropriate tasks have been considered: minimization of operational material consumption; determination of maximum scope of work to be executed while maintaining one system; optimization of operational material consumption while organizing maintenance of a system group; planning of technical maintenance and determination of a number of systems to be maintained. Formalization and solution of the above problems have been accomplished.

  11. Evaluation System and Implementation Countermeasure of Automobile Green Maintenance

    Science.gov (United States)

    Zhang, Fei; Xie, Xinxin; Yan, Chaoyong

    2018-01-01

    Green maintenance research is in the beginning of our country, the work is being explored. Based on the existing research results at home and abroad, this paper learns and draws lessons from the experiences and lessons of foreign advanced countries and domestic advanced enterprises. In the face of the challenges brought by economic development and energy saving and emission reduction, this paper discusses the green maintenance theory and security system, And the research status of green maintenance content and system at home and abroad, through the deletion and selection of green maintenance index, through the AHP method to determine the green evaluation criteria, and the introduction of C equivalent evaluation system, the use of fuzzy synthesis Evaluation method to build a green maintenance evaluation model, and the actual validation, put forward the implementation of green maintenance feasibility programs and related security recommendations, vehicle maintenance enterprises to carry out green maintenance, improve business efficiency and reduce environmental management costs to provide theoretical basis. And to achieve effective reduction of environmental pollution, reduce maintenance costs of the target, a reasonable promotion of maintenance and environmental protection and sustainable development. Promote green maintenance from research to practice, from the laboratory to the maintenance of enterprises, from the pilot to the overall development and transformation.

  12. Predictive maintenance systems in continuous mine transport installations. Case study from Puentes mine. Sistemas de mantenimiento predictivo en instalaciones mineras de transporte continuo. Casa mina de Puentes

    Energy Technology Data Exchange (ETDEWEB)

    Arechaga Rodriguez, F; Roda Vazquez, C [ENDESA, Madrid (Spain)

    1988-01-01

    At some complex mining installations it is necessary to complement the corrective and preventive maintenance with new systems that enable the detection of failures before they become evident and cause a breakdown. These systems, called predictive maintenance, use several techniques, such as: vibration control, lubricant analysis, wear control, etc. This kind of maintenance provides good results, and although it is not expensive, it requires qualified personnel and good organisation.

  13. LHCb Online Log Analysis and Maintenance System

    CERN Document Server

    Garnier, J-C

    2011-01-01

    History has shown, many times computer logs are the only information an administrator may have for an incident, which could be caused either by a malfunction or an attack. Due to the huge amount of logs that are produced from large-scale IT infrastructures, such as LHCb Online, critical information may be overlooked or simply be drowned in a sea of other messages. This clearly demonstrates the need for an automatic system for long-term maintenance and real time analysis of the logs. We have constructed a low cost, fault tolerant centralized logging system which is able to do in-depth analysis and cross-correlation of every log. This system is capable of handling O(10000) different log sources and numerous formats, while trying to keep the overhead as low as possible. It provides log gathering and management, Offline analysis and online analysis. We call Offline analysis the procedure of analyzing old logs for critical information, while Online analysis refer to the procedure of early alerting and reacting. ...

  14. An expert system for steam generator maintenance

    International Nuclear Information System (INIS)

    Remond, A.

    1988-01-01

    The tube bundles in PWR steam generators are, by far, the major source of problems whether they are due to primary and secondary side corrosion mechanisms or to tube vibration-induced wear at tube support locations. Because of differences in SG operating, materials, and fabrication processes, the damage may differ from steam generator to steam generator. MPGV, an expert system for steam generator maintenance uses all steam generator data containing data on materials, fabrication processes, inservice inspection, and water chemistry. It has access to operational data for individual steam generators and contains models of possible degradation mechanisms. The objectives of the system are: · Diagnosing the most probable degradation mechanism or mechanisms by reviewing the entire steam generator history. · Identifying the tubes most exposed to future damage and evaluating the urgency of repair by simulating the probable development of the problem in time. · Establishing the appropriate preventive actions such as repair, inspection or other measures and establishing an action schedule. The system is intended for utilities either for individual plants before each inspection outage or any time an incident occurs or for a set of plants through a central MPGV center. (author)

  15. Using the system maintenance datastore to characterize lifetime maintenance for PLiM

    International Nuclear Information System (INIS)

    Watson, P.; Dam, R.; Nickerson, J.

    2004-01-01

    A comprehensive Plant Life Management (PLiM) program involves evaluating a large amount of information. For any plant, there are numerous maintenance, surveillance and inspection programs for the important systems, structures and components. There is extensive industry experience on component failure modes, degradation mechanisms and recommended maintenance practices. This information forms the basis of the aging assessment work, through which improvements to these plant programs are identified. AECL has developed several tools to manage the quantities of information required in aging assessment studies, such as the SYSTMS (SYtematic approach for the development of STrategy for Maintenance and Surveillance) tool and the System Maintenance Datastore (SMD). The SMD has been developed to serve as a hub to a Systematic based Adaptive Maintenance Program (SAMP), by storing maintenance resource requirements for recommended maintenance tasks for use by the other processes in a SAMP. The SMD can be used to (a) quantify the savings or cost of optimising a maintenance program, (b) characterize and understand long term trends in condition-based maintenance due to component aging, (c) quantify the resource savings due to optimum timing of component replacement or general plant refurbishment, and (d) provide aging assessment cost information for input to plant asset evaluation. The SMD contains data for regular maintenance program tasks, plant condition assessment recommendations, and equipment refurbishment costs. A prototype SMD has been developed with data tables populated with information from operating CANDU stations. The SMD is now available to be used either with a SYSTMS evaluation or with a plant's database of maintenance tasks. (author)

  16. PROCESS OF CHANGES OF MAINTENANCE-FREE ONBOARD SYSTEM OPERATIONAL STATUS BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    Andrey Mikhaylovich Bronnikov

    2017-01-01

    Full Text Available In this article the authors consider the problem of simulating the process of a maintenance-free between scheduled maintenance aircraft system operational status changes, which failure during the flight leads to the disaster. On-board equipment with automatic self-repair between routine maintenance in the event the components fail is called maintenance-free. During operation, onboard equipment accumulates failures maintaining its functions with a safety level not lower than the required minimum. Trouble shooting is carried out either at the end of between-maintenance period (as a rule, or after the failure, which led to the functions disorder or to the decrease below the target level of flight safety (as an exception. The system contains both redundant and nonredundant units and elements with the known failure rates. The system can be in one of the three states: operable, extreme, failed. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. The process of system operational status changes is described with the discrete-continuous model in the flight time. Basing on the information about the probabilities of the on-board equipment being in an operable, extreme or failed state, it is possible to calculate such complex efficiency indicators as the average loss of sorties, the average operating costs, the expected number of emergency recovery operations and others. Numerical studies have been conducted to validate the proposed model. It is believed that maintenance work completely updates the system. The analysis of these indicators will allow to evaluate the maintenance-free aircraft equipment operation efficiency, as well as to make an effectiveness comparison with other methods of technical operation. The model can be also used to assess the technical operation systems performance. The model can be used to optimize the period between maintenance.

  17. Remote-maintenance features of the Fusion Materials Irradiation Test (FMIT) facility lithium system

    International Nuclear Information System (INIS)

    Kelly, V.P.

    1981-01-01

    The FMIT Facitlity has been redesigned to allow remote maintenance of lithium system components such as the main lithium pump, heat exchanger, traps, and valves. Remote versus contact maintenance is required due to the limited effectiveness of methods planned for control of the radioisotope 7 Be which is formed in the lithium during the neutron generating process. The altered FMIT arrangement provides cubicles for isolation of the main pump and system dump valve to allow personnel access for completing welds on large diameter piping after replacing failed components. Maintenance on other components such as the main heat exchanger and traps will be done remotely. The resulting arrangement provides full capability to meet the required facility availability criteria with minimum impact on the facility and with minimum associated development costs

  18. A remote maintenance robot system for a pulsed nuclear reactor

    International Nuclear Information System (INIS)

    Thunborg, S.

    1987-01-01

    This paper presents a remote maintenance robot system for use in a hazardous environment. The system consists of turntable, robot and hoist subsystems which operate under the control of a supervisory computer to perform coordinated programmed maintenance operations on a pulsed nuclear reactor. The system is operational

  19. Multisphere system neutron spectrometry applied to dosimetry for the personnel

    International Nuclear Information System (INIS)

    Allinei, P.G.

    1992-01-01

    Neutron dosimetry is a necessity that must be dealt with in order to ensure efficient monitoring of all personnel regarding radiology safety. Dosimetric variables are difficult to measure for they are dependent on complex functions evolving with the energy of neutrons, which forces us to determine their energetic distribution. We have chosen to use the multisphere system associated to an unfolding code in order to perform neutron spectrometry, our purpose being to determine these dosimetric variables. The initial stage consists in modifying a research code, the code SOHO, in order to adapt it to our needs. The resulting new version was subsequently tested and proven successful by means of computerized simulations. Afterwards, we used reference dosimetric and spectral beams to confirm the position results previously obtained. At the time of this test, the code SOHO yielded results coherent with the theoretical values, and even allowed the quantity of radiation diffused by the laboratory structures to be estimated. The final part of this study consists in applying the previously perfected technique to authentic situations. The results thus obtained are compared to those obtained by conventional methods in order to reveal the interest of neutron spectrometry used for dosimetry of the personnel

  20. A condition-based maintenance policy for stochastically deteriorating systems

    International Nuclear Information System (INIS)

    Grall, A.; Berenguer, C.; Dieulle, L.

    2002-01-01

    We focus on the analytical modeling of a condition-based inspection/replacement policy for a stochastically and continuously deteriorating single-unit system. We consider both the replacement threshold and the inspection schedule as decision variables for this maintenance problem and we propose to implement the maintenance policy using a multi-level control-limit rule. In order to assess the performance of the proposed maintenance policy and to minimize the long run expected maintenance cost per unit time, a mathematical model for the maintained system cost is derived, supported by the existence of a stationary law for the maintained system state. Numerical experiments illustrate the performance of the proposed policy and confirm that the maintenance cost rate on an infinite horizon can be minimized by a joint optimization of the maintenance structure thresholds, or equivalently by a joint optimization of a system replacement threshold and the aperiodic inspection schedule

  1. Remote maintenance system technology development for nuclear fuel cycle plants

    International Nuclear Information System (INIS)

    Kashihara, Hidechiyo

    1984-01-01

    The necessity of establishing the technology of remote maintenance, the kinds of maintenance techniques and the change, the image of a facility adopting remote maintenance canyon process, and the outline of the R and D plan to put remote maintenance canyon process in practical use are described. As the objects of development, there are twin arm type servo manipulator system, rack system, remote tube connectors, solution sampling system, inspection system for in-cell equipment, and large plugs for wall penetration. The outline of those are also reported. The development of new remote maintenance technology has been forwarded in the Tokai Works aiming at the application to a glass solidification pilot plant and a FBR fuel recycling test facility. The lowering of the rate of utilization of cells due to poor accessibility and the increase of radiation exposure of workers must be overcome to realize nuclear fuel cycle technology. The maintenance technology is classified into crane canyon method, direct maintenance cell method, remote maintenance cell method and remote maintenance canyon method, and those are described briefly. The development plan of remote maintenance technology is outlined. (Kako, I.)

  2. Integrated sign management system : ADOT maintenance group

    Science.gov (United States)

    2003-12-01

    The Arizona Department of Transportation (ADOT) maintains and manages an inventory of roadway signs. Before the implementation of this project, sign technicians maintained inventory records on individual laptops to track their daily sign maintenance ...

  3. Increment 23/24 Critical Readiness Review Health Maintenance System

    Science.gov (United States)

    Nieschwitz, Linda

    2010-01-01

    This slide presentation reviews the Health Maintenance System. It includes information on the carbon dioxide (CO2) and moisture removal system (CMRS), the variable oxygen system,rendevous station panels, and the crew contamination protection kit (CCPK).

  4. Optimization of maintenance periodicity of complex of NPP safety systems

    International Nuclear Information System (INIS)

    Kolykhanov, V.; Skalozubov, V.; Kovrigkin, Y.

    2006-01-01

    The analysis of the positive and negative aspects connected to maintenance of the safety systems equipment which basically is in a standby state is executed. Tests of systems provide elimination of the latent failures and raise their reliability. Poor quality of carrying out the tests can be a source of the subsequent failures. Therefore excess frequency of tests can result in reducing reliability of safety systems. The method of optimization of maintenance periodicity of the equipment taking into account factors of its reliability and restoration procedures quality is submitted. The unavailability factor is used as a criterion of optimization of maintenance periodicity. It is offered to use parameters of reliability of the equipment and each of safety systems of NPPs received at developing PSA. And it is offered to carry out the concordance of maintenance periodicity of systems within the NPP maintenance program taking into account a significance factor of the system received on the basis of the contribution of system in CDF. Basing on the submitted method the small computer code is developed. This code allows to calculate reliability factors of a separate safety system and to determine optimum maintenance periodicity of its equipment. Optimization of maintenance periodicity of a complex of safety systems is stipulated also. As an example results of optimization of maintenance periodicity at Zaporizhzhya NPP are presented. (author)

  5. Data processing of personnel exposure in TLD and film systems

    International Nuclear Information System (INIS)

    Lerner, A.; Liav, N.; Eisen, Y.

    1979-01-01

    The program for the processing and storage of data on the personnel irradiation exposure in Israel is built on the data base of the Weizmann Institute of Science; it is a general program suitable for both TLD and film dosimetry. The TSO system helped bring up-to-date the data of the various collections in an interactive way. The introduction of the TLD dosemeters in the badge service required certain changes in the thinking line - this because the TLD being a personal dosemeter is returned into service after having been deciphered. This demands following up the dosemeter when the worker moves from unit to unit or after he had finished his work. The program takes into account the internal exposures,too and conforms to the new recommendation published in ICRP-26. (B.G.)

  6. 78 FR 44475 - Protection System Maintenance Reliability Standard

    Science.gov (United States)

    2013-07-24

    ... that the performance or product has some reliability-related value, then the requirement will have...] Protection System Maintenance Reliability Standard AGENCY: Federal Energy Regulatory Commission, Energy... Commission proposes to approve a revised Reliability Standard, PRC-005- 2--Protection System Maintenance, to...

  7. 14 CFR 121.1113 - Fuel tank system maintenance program.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel tank system maintenance program. 121... Improvements § 121.1113 Fuel tank system maintenance program. (a) Except as provided in paragraph (g) of this... capacity of 7500 pounds or more. (b) For each airplane on which an auxiliary fuel tank is installed under a...

  8. 14 CFR 129.113 - Fuel tank system maintenance program.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel tank system maintenance program. 129... Continued Airworthiness and Safety Improvements § 129.113 Fuel tank system maintenance program. (a) Except... on which an auxiliary fuel tank is installed under a field approval, before June 16, 2008, the...

  9. The development of web based power plant maintenance management system

    International Nuclear Information System (INIS)

    Kim, Bum Shin; Kim, Eui Hyun; Jang, Dong Sik; Cho, Jae Min; Chae, Gil Seok; Jung, Gyu Chol

    2004-01-01

    Most power plants have operated many independent computerize systems for maintenance. Independence of systems have caused complexity of business process and inconvenience of computer system management. Because the equipment and material master data is not standardize and structurize, it is difficult to manage equipment maintenance history and material delivery. Especially equipment classification criterion is important for standardization of every maintenance information. It is necessary to integrate function of independent systems for business process simplification and rapid work flow. This paper provides equipment classification criterion design and system integration method with the case of live system development

  10. The utilization of performance evaluation instruments by technical trainers to evaluate maintenance personnel in the nuclear power industry in the United States

    International Nuclear Information System (INIS)

    Hornberger, C.K.

    1993-01-01

    The purpose of this study was to document the utilization of performance evaluation instruments by technical trainers in the evaluation of maintenance personnel in US nuclear power plants. Performance evaluation of maintenance personnel has been identified by nuclear utilities and the Nuclear Regulatory Commission as the only acceptable method of determining worker competence. The NRC requires performance evaluation to be conducted to performance standards, but it does not specify the standards or the method to be utilized. Each plant is free to establish its own standards and methods of evaluation. This was a descriptive study utilizing descriptive statistics for the analysis of the data. The subjects included 655 maintenance trainers in 72 US nuclear plants. Conclusions of the study include: (1) Technical trainers are in compliance with NRC regulations. (2) Evaluation materials developed by the Institute of Nuclear Power Operations are used by technical trainers in every one of the 62 plants that responded. (3) In-plant or self-developed Performance Evaluation Instruments are utilized by 419 or 95.2% of the technical trainers. (4) Technical trainers incorporate nine common components into their Performance Evaluation Instruments. (5) Technical trainers evaluate maintenance processes and the product produced by workers when following procedures and specifications are critical and when safety hazards are involved. (6) Technical trainers believe that utilizing Performance Evaluation Instruments makes their job easier by providing documentation about the quality and standards of maintenance skills. (7) Technical trainers believe that maintenance workers benefit when their skills are assessed through the use of Performance Evaluation Instruments

  11. ATLAS Maintenance and Operation management system

    CERN Document Server

    Copy, B

    2007-01-01

    The maintenance and operation of the ATLAS detector will involve thousands of contributors from 170 physics institutes. Planning and coordinating the action of ATLAS members, ensuring their expertise is properly leveraged and that no parts of the detector are understaffed or overstaffed will be a challenging task. The ATLAS Maintenance and Operation application (referred to as Operation Task Planner inside the ATLAS experiment) offers a fluent web based interface that combines the flexibility and comfort of a desktop application, intuitive data visualization and navigation techniques, with a lightweight service oriented architecture. We will review the application, its usage within the ATLAS experiment, its underlying design and implementation.

  12. Operation and maintenance requirements of system design bases

    International Nuclear Information System (INIS)

    Banerjee, A.K.; Hanley, N.E.

    1989-01-01

    All system designs make assumptions about system operation testing, inspection, and maintenance. Existing industry codes and standards explicitly address design requirements of new systems, while issues related to system and plant reliability, life, design margins, effects of service conditions, operation, maintenance, etc., usually are implicit. However, system/component design documents of existing power plants often address the code requirements without considering the operation, maintenance, inspection, and testing (OMIT) requirements. The nuclear industry is expending major efforts at most nuclear power plants to reassemble and/or reconstitute system design bases. Stone ampersand Webster Engineering Corporation (SWEC) recently addressed the OMIT requirements of system/component design as an integral part of a utility's preventive maintenance program. For each component, SWEC reviewed vendor recommendations, NPRDS data/industry experience, the existing maintenance program, component service conditions, and actual plant experience. A maintenance program that considers component service conditions and plant experience ensures a connection between maintenance and design basis. Root cause analysis of failure and engineering evaluation of service condition are part of the program. System/component OMIT requirements also are compared against system design, service condition, degradation mechanism, etc., through system/component life-cycle evaluation

  13. Maintenance of fire systems and equipment at Virginia Power

    International Nuclear Information System (INIS)

    Doubrely, E.B. Jr.

    1989-01-01

    The basics of fire protection systems maintenance are well codified and documented in the National Fire Codes published by the National Fire Protection Association. In addition, Insurers often promulgate minimum standards for fire protection systems design and maintenance to which they attach conditions of insurability. Regulatory agencies and even in-house corporate policies can impact the maintenance of fire protection systems and equipment. This presentation will focus on the various methods and alternate ways of performing system maintenance, whether required by code, insurer, or by some regulatory commitment at Virginia Powers North Anna and Surry nuclear power stations. The approach to performing similar work is handled differently at each station. This difference can be attributed to proximity to outside assistance as well as plant philosophy. In addition to station maintenance practices, a discussion of in-house servicing of portable fire suppression equipment is offered. 1 tab

  14. Environmental management system for transportation maintenance operations : [technical brief].

    Science.gov (United States)

    2014-04-01

    This report provides the framework for the environmental management system to analyze : greenhouse gas emissions from transportation maintenance operations. The system enables user : to compare different scenarios and make informed decisions to minim...

  15. Towards Signalling Maintenance Scheduling for European Railway Traffic Management System

    DEFF Research Database (Denmark)

    M. Pour, Shahrzad

    signalling system. Therefore, the entire maintenance system needs to change from the previous system to the newest system, and hence, new optimisation techniques need to be established so as to facilitate managers in creating ideal maintenance strategies. The aim of this thesis is to develop new maintenance......The European Railway Traffic Management System (ERTMS) is the newest signalling standard that has been introduced in the railway industry. The aim of ERTMS is to ensure better signalling communication amongst various train systems, and hence, to help in attaining improved connectivity and commuting...... between European countries. In various countries across the world, there is a gradual shift from the current signalling systems to ERTMS. Amongst the European countries, Denmark was the first country to commence a full upgrading of its signalling system to ERTMS. A variety of maintenance requirements...

  16. Integrated maintenance planning in manufacturing systems

    CERN Document Server

    Al-Turki, Umar M; Yilbas, Bekir Sami; Sahin, Ahmet Ziyaettin

    2014-01-01

    This book introduces the concept of integrated planning for maintenance and production taken into account quality and safety for high global socio-economic impact. It provides insight into the planning process at a global level starting from the business level and ending with the operational level where the plan is implemented and controlled.

  17. Significance of Building Maintenance Management Systems towards Sustainable Development

    Directory of Open Access Journals (Sweden)

    M.A. Othuman Mydin

    2014-05-01

    Full Text Available Building maintenance management is an organized and effective system of maintenance operations which is set up to deal with problems related to the upkeep of a building. Its goal, aside from locating and remedying a building’s deficiencies, is to effectively minimize the overall costs of maintenance and is also an effort to maximize the gain and benefits from the savings. There are a few factors that influence decisions to undertake maintenance work. The principal goal of maintenance is to protect a building in the early stage of issues as they arise. Some major reasons for maintaining a building include retaining its reputation and value of investments, maintaining the building in a condition which allows it to accomplish its purpose, and presenting a good outer shell. This paper will review and discuss some of the major elements of building maintenance towards achieving sustainable buildings.

  18. Surface Moisture Measurement System Operation and Maintenance Manual

    International Nuclear Information System (INIS)

    Ritter, G.A.; Pearce, K.L.; Stokes, T.L.

    1995-12-01

    This operations and maintenance manual addresses deployment, equipment and field hazards, operating instructions, calibration verification, removal, maintenance, and other pertinent information necessary to safely operate and store the Surface Moisture Measurement System (SMMS) and Liquid Observation Well Moisture Measurement System (LOWMMS). These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  19. Maintenance study for W-340 Waste Retrieval System

    International Nuclear Information System (INIS)

    Christensen, C.; Conner, C.C.; Sekot, J.P.

    1994-05-01

    This study was performed to identify attributes and maintainability requirements for the Tank Waste Retrieval System (TWRS). The system will be developed for Westinghouse Hanford Company in Richland, Washington, as an integrated system to perform waste removal in Tank C-106 and, thus, demonstrate technologies for tank remediation that will satisfy requirements of the Tri-Party Agreement. The study examines attributes of the TWRS, scope of maintenance operations required for the TWRS, maintenance requirements, and potential methods of performing maintenance functions. Recommendations are provided for consideration in the development of both the conceptual design and performance specification, which will be used in procuring the W-340 Waste Retrieval System

  20. Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling

    Science.gov (United States)

    As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...

  1. Optimal maintenance of multi-component systems: a review

    NARCIS (Netherlands)

    R.P. Nicolai (Robin); R. Dekker (Rommert)

    2006-01-01

    textabstractIn this article we give an overview of the literature on multi-component maintenance optimization. We focus on work appearing since the 1991 survey "A survey of maintenance models for multi-unit systems" by Cho and Parlar. This paper builds forth on the review article by Dekker et al.

  2. Predictive maintenance of maritime systems : models and challenges

    NARCIS (Netherlands)

    Tinga, T.; Tiddens, W.W.; Amoiralis, F.; Politis, M.; Cepin, Marko; Bris, Radim

    2017-01-01

    To reduce maintenance and logistic costs and increase the asset availability, a predictive maintenance concept for maritime systems is developed. In the present paper, the physics-of-failure based prognostic methods will be introduced, but also other issues related to the development and application

  3. Organization of industrial maintenance in oil pipeline and terminals activities: a project for the implantation of a corporative management system

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Paulo de Tarso Arruda [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Arruda, Daniela Mendonca; Oliveira, Italo Luiz [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper discusses the definition and implementation of a corporate management model for industrial maintenance within TRANSPETRO's Terminals and Oil Pipelines business segment. A project is under way to answer the company's needs for better coordination of its maintenance activities as well as to face the challenge of increasing performance with higher systems and equipment' availability, at lower costs. To achieve this target, the project has been employing updating management tools for industrial maintenance planning and control. Its scope comprises the definition of: industrial maintenance process guidelines; industrial maintenance normative requirements and operational procedures; industrial maintenance performance indicators; local organizational charts; training of maintenance personnel; qualification and certification policies; conceptualization of maintenance engineering and maintenance based on risk; updating technologies such as asset management; warehousing and logistics for maintenance support in the supply of spare parts and materials. The project will also consider the results of a previous strategic sourcing study, concerning the definition of the most suitable out sourcing strategy for each operational unit, considering its characteristics as well as the characteristics of the region where it is located. (author)

  4. Organization of industrial maintenance in oil pipeline and terminals activities: a project for the implantation of a corporative management system

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Paulo de Tarso Arruda [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Arruda, Daniela Mendonca; Oliveira, Italo Luiz [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper discusses the definition and implementation of a corporate management model for industrial maintenance within TRANSPETRO's Terminals and Oil Pipelines business segment. A project is under way to answer the company's needs for better coordination of its maintenance activities as well as to face the challenge of increasing performance with higher systems and equipment' availability, at lower costs. To achieve this target, the project has been employing updating management tools for industrial maintenance planning and control. Its scope comprises the definition of: industrial maintenance process guidelines; industrial maintenance normative requirements and operational procedures; industrial maintenance performance indicators; local organizational charts; training of maintenance personnel; qualification and certification policies; conceptualization of maintenance engineering and maintenance based on risk; updating technologies such as asset management; warehousing and logistics for maintenance support in the supply of spare parts and materials. The project will also consider the results of a previous strategic sourcing study, concerning the definition of the most suitable out sourcing strategy for each operational unit, considering its characteristics as well as the characteristics of the region where it is located. (author)

  5. A concept of distributed architecture for maintenance robot systems

    International Nuclear Information System (INIS)

    Asama, Hajime

    1990-01-01

    Aiming at development of a robot system for maintenance tasks in nuclear power plants, a concept of distributed architecture for autonomous robot systems is discussed. At first, based on investigation of maintenance tasks, requirements for maintenance robots are introduced, and structures to realize multi-functions are discussed. Then, as a new design strategy of maintenance robot system, an autonomous and decentralized robot systems is proposed, which is composed of multiple robots, computers, and equipments, and concept of ACTRESS (ACTor-based Robots and Equipments Synthetic System) including communication framework between robotic components is designed. Finally, as a model of ACTRESS, a experimental system is developed, which deals with object-pushing tasks by two micromice and an environment modeler with communicating with each other. Both of parallel independent motion and cooperative motion based on communication is reconciled, and the efficiency of the distributed architecture is verified. (author)

  6. State-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-04-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system. 5 references, 8 figures

  7. Development of neutron personnel monitoring system based on CR-39 solid state nuclear track detector

    International Nuclear Information System (INIS)

    Massand, O.P.; Kundu, H.K.; Marathe, P.K.; Supe, S.J.

    1990-01-01

    Personnel neutron monitoring aims at providing a method to evaluate the magnitude of the detrimental effects on the personnel exposed to neutrons. Neutron monitoring is done for a small though growing number of personnel working with neutrons in a wide range of situations. Over the years, many solid state nuclear track detectors (SSNTD) have been tried for neutron personnel monitoring. CR-39 SSNTD is a proton sensitive polymer and offers a lot of promise for neutron personnel monitoring due to its high sensitivity and lower energy threshold for neutron detection. This report presents the mechanism of track formation in this polymer, the development of this neutron personnel monitoring system in our laboratory, its various characteristics and its promise as a routine personnel neutron monitor. (author). 1 tab., 7 figs

  8. Cask system maintenance in the Federal Waste Management System

    International Nuclear Information System (INIS)

    Pope, R.B.; Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    In early 1988, in support of the development of the transportation system for the Office of Civilian Radioactive Waste Management System (OCRWM), a feasibility study was undertaken to define a the concept for a stand-alone, ''green-field'' facility for maintaining the Federal Waste Management System (FWMS) casks. This study provided and initial layout facility design, an estimate of the construction costs, and an acquisition schedule for a Cask Maintenance Facility (CMF). It also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs derived from the study have been organized for use in the total transportation system decision-making process. Most importantly, they also provide a foundation for continuing design and planning efforts. The feasibility study was based on an assumed stand-alone, ''green-field'' configuration. This design approach provides a comprehensive design evaluation, to guide the development of a cost estimate and to permit flexibility in locating the facility. The following sections provide background information on cask system maintenance, briefly summarizes some of the functional requirements that a CMF must satisfy, provides a physical description of the CMF, briefly discusses the cost and schedule estimates and then reviews the findings of the efforts undertaken since the feasibility study was completed. 15 refs., 3 figs

  9. Information Technology Management: The Development of the Navy Standard Integrated Personnel System

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    ... Information Systems Review Council (Council) approved Milestone 0 for the Navy System. While approving the milestone, the Council also stated that the Navy System should incorporate the core capabilities of a common DoD-wide military personnel system...

  10. Experience with quality of training of personnel in start-up, operation and maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Ziman, V.; Alaxin, E.

    1983-01-01

    The theoretical education of personnel takes place in the branch training centre in Jaslovske Bohunice and in the concern training centre of the Slovak Power Plants. Practical training takes place in the Bohunice V-1 power plant. Selected specialists are trained in the training centre of the Novo Voronezh nuclear power plant, at the Paks nuclear plant and in the training centre of the Tusimice power plant. The recruitment, selection, schooling, practical training and placement of personnel and their assignment to posts is done in such a manner as to make sure that the complexly trained personnel is available 6 months to 3 years prior to the physical start-up of the nuclear power plant. The training of university graduates for the post of reactor operator takes 18 months or more. Trained personnel attend in-service training courses in form of complementary courses whose content includes such problems as the elimination of typified possible accidents, on the basis of the analysis of all failures which occurred in the previous period. The rising quality of personnel training at the Bohunice V-1 nuclear power plant is reflected in the decreasing number of failures caused by the human factor and in the increased availability of the power units. (M.D.)

  11. MAINTENANCE MANAGEMENT ACCOUNTING SYSTEM OF WASTE WATER DISPOSAL SYSTEMS

    Science.gov (United States)

    Hori, Michihiro; Tsuruta, Takashi; Kaito, Kiyoyuki; Kobayashi, Kiyoshi

    Sewage works facilities consist of various assets groups. And there are many kinds of financial resources. In order to optimize the maintenance plan, and to secure the stability and sustainability of sewage works management, it is necessary to carry out financial simulation based on the life-cycle cost analysis. Furthermore, it is important to develop management accounting system that is interlinked with the financial accounting system, because many sewage administration bodies have their financial accounting systems as public enterprises. In this paper, a management accounting system, which is designed to provide basic information for asset management of sewage works facilities, is presented. Also the applicability of the management accounting system presented in this paper is examined through financial simulations.

  12. Double-Shell Tanks System Maintenance and Recovery Needs Report

    International Nuclear Information System (INIS)

    SMITH, D.F.

    2002-01-01

    This report represents an initial effort to identify maintenance equipment needed to support critical components used for delivery of waste feed to the Waste Isolation and Treatment Plant (WTP). Rough estimates of cost benefits for selected maintenance capabilities are provided. A follow-on to this report should include a detailed cost analysis showing cost benefits and tradeoffs in selection and development of specific maintenance capabilities. Critical component failures during delivery of waste feed from the DSTs to the WTP have the potential to idle WTP facilities if the duration of the recovery operations are long enough to allow the WTP to exhaust a planned 60-day lag storage capacity for waste feed. If a critical component within the transfer route fails, current planning does not provide for an alternative HLW feed source. Critical components with relatively high failure frequencies and recovery times are identified, along with a summary of documentation regarding historical maintenance and recovery operations and planning. Components, such as mixer pumps and transfer pumps, are estimated to have relatively long recovery times due, in part, to the current practice of sending spare pumps, when needed, off-site to a remote location, for vendor refurbishment and testing prior to installation in a tank. No capability is provided on-site for pump ''run-in''. As neither the spare pumps in storage, installed pumps, or other critical components are subjected to periodic preventive maintenance, and these critical components are planned to be operated intermittently over a long period of time, component failures are to be expected. Recommendations are made for further analysis to identify specific equipment cost benefits, development costs, and tradeoffs in selection of alternatives. This new equipment will provide capabilities for component storage and maintenance in line with vendor recommendations, reduce the duration of recovery operations, and support personnel

  13. Potential of Computerized Maintenance Management System in Facilities Management

    Directory of Open Access Journals (Sweden)

    Noor Farisya Azahar

    2014-07-01

    Full Text Available For some time it has been clear that managing buildings or estates has been carried out in the context of what has become known as facilities management. British Institute of Facilities Management defined facilities management is the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace. Effective facilities management is vital to the success of an organisation by contributing to the delivery of its strategic and operational objectives. Maintenance of buildings should be given serious attention before (stage design, during and after a building is completed. But total involvement in building maintenance is after the building is completed and during its operations. Residents of and property owners require their building to look attractive, durable and have a peaceful indoor environment and efficient. The objective of the maintenance management system is to stream line the vast maintenance information system to improve the productivity of an industrial plant. a good maintenance management system makes equipment and facilities available. This paper will discuss the fundamental steps of maintenance management program and Computerized Maintenance Management System (CMMS

  14. Multi-level predictive maintenance for multi-component systems

    International Nuclear Information System (INIS)

    Nguyen, Kim-Anh; Do, Phuc; Grall, Antoine

    2015-01-01

    In this paper, a novel predictive maintenance policy with multi-level decision-making is proposed for multi-component system with complex structure. The main idea is to propose a decision-making process considered on two levels: system level and component one. The goal of the decision rules at the system level is to address if preventive maintenance actions are needed regarding the predictive reliability of the system. At component level the decision rules aim at identifying optimally a group of several components to be preventively maintained when preventive maintenance is trigged due to the system level decision. Selecting optimal components is based on a cost-based group improvement factor taking into account the predictive reliability of the components, the economic dependencies as well as the location of the components in the system. Moreover, a cost model is developed to find the optimal maintenance decision variables. A 14-component system is finally introduced to illustrate the use and the performance of the proposed predictive maintenance policy. Different sensitivity analysis are also investigated and discussed. Indeed, the proposed policy provides more flexibility in maintenance decision-making for complex structure systems, hence leading to significant profits in terms of maintenance cost when compared with existing policies. - Highlights: • A predictive maintenance policy for complex structure systems is proposed. • Multi-level decision process based on prognostic results is proposed. • A cost-based group importance measure is introduced for decision-making. • Both positive and negative dependencies between components are investigated. • A cost model and Monte Carlo simulation are developed for optimization process.

  15. Manual on maintenance of systems and components important to safety

    International Nuclear Information System (INIS)

    1986-01-01

    The Manual should serve as guidance at the plant management level for the maintenance of systems and components important to safety. It includes a detailed description of management systems, administrative controls and procedures. The Annexes contain examples of documents and practices adopted by Operating Organizations of some Member States. It is not the intention of this Manual to address the technical problem of how to maintain a particular component but rather to cover the programmatic aspects of maintenance. It also contains some aspects of surveillance and verification activities. The Manual makes only general statements about radiation protection provisions in connection with maintenance; detailed guidance can be found in other IAEA documents

  16. Protocol of source shielding maintenance in a level measurement systems

    International Nuclear Information System (INIS)

    Gonzales, E.; Figueroa, J.

    1996-01-01

    Maintenance labor of the source shielding and locking system is not performed in many Venezuelan enterprises that employ radioactive level gauge in large container. The lack of maintenance and the ambient long lasting action have produced impairment of many devices and their given parts rise to economical and radiological protection problems. In order to help to solve the mentioned problems, principally to reduce the unjustified dose to workers, the IVIC Health Physics Service worked out a protocol to perform, in a safety way, the maintenance of source shielding and its locking system. This protocol is presented in this paper. (authors)

  17. Gas characterization system operation, maintenance, and calibration plan

    International Nuclear Information System (INIS)

    Tate, D.D.

    1996-01-01

    This document details the responsibilities and requirements for operation, maintenance, and calibration of the Gas Characterization Systems (GCS) analytical instrumentation. It further, defines the division of responsibility between the Characterization Monitoring Development organization and Tank Farms Operations

  18. Maintenance scheduling of a manufacturing system subject to deterioration

    International Nuclear Information System (INIS)

    Ahmadi, Reza; Newby, Martin

    2011-01-01

    This paper presents an integrated model for the joint determination of both optimal inspection strategy and optimal repair policy for a manufacturing system whose resulting output is subject to system state. An appropriate maintenance strategy is essential to optimize revenue from a manufacturing system which is in continuous operation and subject to deterioration. The optimum policy balances the amount of maintenance required to increase availability against the loss of revenue arising from the down time: insufficient maintenance leads to an increase in the number of defective items, low profit and low maintenance cost; excessive maintenance results in a reduction in the proportion of defective items, high profit and high maintenance cost. In this paper, an intensity control model adapted to partial information provides an optimal inspection intensity and repair degree of the system as an optimal control process to yield maximum revenue. The solution is obtained through formulating an equivalent deterministic Hamilton-Jacobi equation. A numerical example is provided to illustrate the behavior of the optimal control process. The optimal control process determines a solution to both optimum inspection frequency and optimal replacement policy which results in an optimal production run length of the system. - Highlights: → We develop an optimum asset management strategy based on the revenue generated by the asset. → The optimum strategy controls the intensity, rate of occurrence, of interruptions to service. → The decisions are based on partial observation of the system and do not need perfect information. There is no need for continuous monitoring of the system.

  19. Essential Approach of Maintenance Management System of Office Building

    Directory of Open Access Journals (Sweden)

    Masyatul Husna Othman

    2013-09-01

    Full Text Available Buildings will be worn-out, dilapidated and dirty as time goes by; but with good maintenance management we can at least prolong the lifespan of building longer as well as provide the building services and keep the building performance at it ultimate level. The importance of carrying out a systematic and routine maintenance works as part of works to conserve building performance is often neglected due to various factors including due to misunderstanding on the needs of the maintenance works itself and budget allocated. Thus, the purpose of the present study was to evaluating the level of maintenance management and quality of services in office buildings. This study also sought to answer the following question to determine the basic approach of maintenance management system used for office buildings.

  20. The nuclear power plant maintenance personnel reliability prediction (NPP/MPRP) effort at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.

    1982-01-01

    Human errors committed during maintenance activities are potentially a major contribution to the overall risk associated with the operation of a nuclear power plant (NPP). An NRC-sponsored program at Oak Ridge National Laboratory is attempting to develop a quantitative predictive technique to evaluate the contribution of maintenance errors to the overall NPP risk. The current work includes a survey of the requirements of potential users to ascertain the need for and content of the proposed quantitative model, plus an initial job/task analysis to determine the scope and applicability of various maintenance tasks. In addition, existing human reliability prediction models are being reviewed and assessed with respect to their applicability to NPP maintenance tasks. This paper discusses the status of the program and summarizes the results to date

  1. Evaluation of a real-time personnel and material tracking system

    International Nuclear Information System (INIS)

    Trujillo, A.A.; Hoover, C.E.; Garcia, B.A.

    1988-01-01

    Past experience in addressing the insider threat has led to the development of general principles for mitigating the insider threat while minimizing adverse impacts on site operations. Among the general principles developed was the requirement of a real-time personnel and material tracking system. A real-time system for personnel and material tracking will aid in mitigating the insider threat by providing critical information regarding the movement and location of personnel and material. In addition, this system can provide an early detection mechanism for potential insider actions. A system integrating Radio Frequency (RF) transmitters for real-time personnel and material tracking has been developed. This system was installed and tested in an operational environment. This test was intended to demonstrate the system's ability to successfully control access to material and areas by personnel, as well as providing information regarding the status of materials in transit and storage

  2. Privacy Act System of Records: EPA Personnel Emergency Contact Files, EPA-44

    Science.gov (United States)

    Learn about the EPA Personnel Emergency Contact Files System, including including who is covered in the system, the purpose of data collection, routine uses for the system's records, and other security procedure.

  3. FIELD-PRODUCED JP-8 STANDARD FOR CALIBRATION OF LOWER EXPLOSIVE LIMIT METERS USED BY JET FUEL TANK MAINTENANCE PERSONNEL

    Science.gov (United States)

    Thousands of military personnel and tens of thousands of civilian workers perform jet fuel tank entry procedures. Before entering the confined space of a jet fuel tank, OSHA regulations (29CFR1910.146) require the internal atmosphere be tested with a calibrated, direct-reading...

  4. 33 CFR 105.250 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and... include procedures for identifying and responding to security system and equipment failures or...

  5. 33 CFR 104.260 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and... procedures for identifying and responding to security system and equipment failures or malfunctions. ...

  6. The System for Assessment of the Effectiveness of Personnel Stimulation on the Basis of Integral Index

    Directory of Open Access Journals (Sweden)

    O. K.

    2017-12-01

    Full Text Available The article’s objective is to construct the system for assessment ofpersonnel manage­ ment performance and its testing on a sample o f Ukrainian companies. Problems o f person­ nel stimulation at company level are highlighted. It is proposed to build the mechanism for company personnel stimulation by functional approach. Indicators to be used for assess­ ing the means o f personnel stimulation (material stimulation, organizational stimulation, social and psychological stimulation and personnel management modeling are given. The algorithm for estimating the integral index o f the personnel stimulation effectiveness is recommended. Estimation o f the index o f social and psychological stimulation of company personnel by the proposed method is illustrated. By use o f the proposed algorithm it is demonstrated that the material stimulation (salary rate is the most important determinant o f the highly effective personnel stimulation. The integral index o f the personnel stimulation effectiveness is estimated by correlation and regression analysis for a sample of Ukrainian companies over 2011-2015. On its basis, the companies under study are grouped by level of personnel stimulation. Corrective measures to increase the integral index o f the personnel stimulation effectiveness in each company under study are proposed. The matrix o f correc­ tive measures on personnel stimulation at these companies is constructed and used to find the range o f estimates o f the integral index o f the personnel stimulation effectiveness. The quality o f personnel stimulation mechanism at company level is assessed on the basis o f the estimated integral index o f the personnel stimulation effectiveness.

  7. Job analysis of the maintenance supervisor and instrument and control supervisor positions for the nuclear power plant maintenance personnel reliability model

    International Nuclear Information System (INIS)

    Bartter, W.D.; Siegel, A.I.; Federman, P.J.

    1982-11-01

    The present report presents the results of an analysis of the jobs of maintenance mechanic supervisors and instrument and control technician supervisors in nuclear power plants. Such an analysis was considered to be a necessary step in defining the scope and focus of a model for predicting and analyzing nuclear power maintenance reliability. The model will focus upon tasks and subtasks performed by various job positions. The results of this job analysis, along with the results of a survey of user needs vis-a-vis such a model and the results of parallel analyses of the job of maintenance mechanics and of instrument and control technicians provide the sound foundation on which such a model may be built. Job analysis possesses implications for a number of purposes. It provides insight into selection standards, job structuring and organization, performance analysis, training objective establishment, and training content derivation. Accordingly, the results of the present work possess implications for a variety of interest areas relative to safe and efficient operation of nuclear power plants

  8. Maintenance resources optimization applied to a manufacturing system

    International Nuclear Information System (INIS)

    Fiori de Castro, Helio; Lucchesi Cavalca, Katia

    2006-01-01

    This paper presents an availability optimization of an engineering system assembled in a series configuration, with redundancy of units and corrective maintenance resources as optimization parameters. The aim is to reach maximum availability, considering as constraints installation and corrective maintenance costs, weight and volume. The optimization method uses a Genetic Algorithm based on biological concepts of species evolution. It is a robust method, as it does not converge to a local optimum. It does not require the use of differential calculus, thus facilitating computational implementation. Results indicate that the methodology is suitable to solve a wide range of engineering design problems involving allocation of redundancies and maintenance resources

  9. Personnel Performance Assessment in Information Systems Outsourcing Environments

    Science.gov (United States)

    Casado-Lumbreras, Cristina; Soto-Acosta, Pedro; Colomo-Palacios, Ricardo; de Pablos, Patricia Ordonez

    2011-01-01

    Purpose: The aim of this paper is to present a tool which uses semantic technologies for personnel performance and workplace learning assessment in outsourced information technology environments. Design/methodology/approach: The paper presents the tool from a technical perspective and introduces a use case that depicts the main features related to…

  10. Expert system for maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Ito, Tetsuo; Kasahara, Takayasu; Watanabe, Takao; Matsuki, Tsutomu.

    1989-01-01

    The basic function of the expert system which supports the maintenance works such as the diagnosis of nuclear power plants and the planning of maintenance works was developed. For the maintenance of large scale plants like nuclear power plants, much manpower is required. Consequently, it has been desired to develop the system for improving the maintainability by utilizing the expertise and empirical knowledge of skilled engineers. This system comprises the subsystems for aiding plant diagnosis and maintenance work planning. The former diagnoses the contents of out of order based on the knowledge base, and thereafter, guides the method of taking measures using simulator. The latter establishes the plan by using the method of limiting branching together so that the maintenance works do not interfere mutually or do not affect the operation. Hereafter, it is intended to improve the man-machine condition and expand knowledge aiming at the practical use. The outline of the system, the constitution of subsystems, the example of plant diagnosis, the support of plant maintenance work planning and so on are reported. (K.I.)

  11. Development of maintenance knowledge management system for power plant

    International Nuclear Information System (INIS)

    Ohi, Tadashi; Hirai, Kenji

    2004-01-01

    This paper describes the knowledge management framework to systematize maintenance knowledge in power plant. The features of the framework are (1) to construct a decision tree of trouble cases incrementally based on Ripple Down Rules (RDR) method and (2) to decide the timing of installing new knowledge based on several metrics obtained by evaluating a structure of a decision tree. We are developing the experimental prototype of maintenance knowledge management system. The system is integrated with plant database (ex. the operation journals and maintenance records). The management of trouble cases is based on the format of XML. For practical purpose, each trouble case is linked with related data (ex. maintenance manuals, equipment configuration, records). Plant workers can easily search for maintenance knowledge and relevant data by specifying observed status. On the other hand, knowledge engineers can monitor occurrence counts of exceptional cases to each node. The metrics calculation gives a cue to locate the effective node for improving the efficiency of retrieval. We are evaluating the functionality and the effectiveness of the system through the application to maintenance work of controller systems. We believe that this framework will be helpful to share common knowledge among plant sites as well as to manage site-specific knowledge. (author)

  12. Implementation of a Personnel Management System "Beaufort": Successes and failures at a Dutch Hospital

    NARCIS (Netherlands)

    Bondarouk, Tatiana; Khosrow-Pour, M.

    2004-01-01

    This case describes a project concerning the implementation of a personnel management system - Beaufort - in Medinet, one of the larger regional general hospitals in The Netherlands. The project plan included two sequential phases: firstly, the introduction of Beaufort to the central personnel and

  13. 33 CFR 106.255 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... Shelf (OCS) Facility Security Requirements § 106.255 Security systems and equipment maintenance. (a) Security systems and equipment must be in good working order and inspected, tested, calibrated, and...

  14. A Naval Aviation Maintenance Organizational Activity Strategic Information System (OASIS)

    Science.gov (United States)

    1990-03-01

    Management Plan ( CIMP ) [Ref. 49] lists all information systems currently being planned or developed to support NAVAIR missions. The four "functional...in the CIMP . They include local area networks (LANs) for specific commands, systems dedicated to supporting one level of maintenance, systems designed

  15. Engineering systems reliability, safety, and maintenance an integrated approach

    CERN Document Server

    Dhillon, B S

    2017-01-01

    Today, engineering systems are an important element of the world economy and each year billions of dollars are spent to develop, manufacture, operate, and maintain various types of engineering systems around the globe. Many of these systems are highly sophisticated and contain millions of parts. For example, a Boeing jumbo 747 is made up of approximately 4.5 million parts including fasteners. Needless to say, reliability, safety, and maintenance of systems such as this have become more important than ever before.  Global competition and other factors are forcing manufacturers to produce highly reliable, safe, and maintainable engineering products. Therefore, there is a definite need for the reliability, safety, and maintenance professionals to work closely during design and other phases. Engineering Systems Reliability, Safety, and Maintenance: An Integrated Approach eliminates the need to consult many different and diverse sources in the hunt for the information required to design better engineering syste...

  16. Instrumentation maintenance

    International Nuclear Information System (INIS)

    Mack, D.A.

    1976-09-01

    It is essential to any research activity that accurate and efficient measurements be made for the experimental parameters under consideration for each individual experiment or test. Satisfactory measurements in turn depend upon having the necessary instruments and the capability of ensuring that they are performing within their intended specifications. This latter requirement can only be achieved by providing an adequate maintenance facility, staffed with personnel competent to understand the problems associated with instrument adjustment and repair. The Instrument Repair Shop at the Lawrence Berkeley Laboratory is designed to achieve this end. The organization, staffing and operation of this system is discussed. Maintenance policy should be based on studies of (1) preventive vs. catastrophic maintenance, (2) records indicating when equipment should be replaced rather than repaired and (3) priorities established to indicate the order in which equipment should be repaired. Upon establishing a workable maintenance policy, the staff should be instructed so that they may provide appropriate scheduled preventive maintenance, calibration and corrective procedures, and emergency repairs. The education, training and experience of the maintenance staff is discussed along with the organization for an efficient operation. The layout of the various repair shops is described in the light of laboratory space and financial constraints

  17. Secure stand alone positive personnel identity verification system (SSA-PPIV)

    International Nuclear Information System (INIS)

    Merillat, P.D.

    1979-03-01

    The properties of a secure stand-alone positive personnel identity verification system are detailed. The system is designed to operate without the aid of a central computing facility and the verification function is performed in the absence of security personnel. Security is primarily achieved by means of data encryption on a magnetic stripe badge. Several operational configurations are discussed. Advantages and disadvantages of this system compared to a central computer driven system are detailed

  18. Advanced Ground Systems Maintenance Anomaly Detection

    Data.gov (United States)

    National Aeronautics and Space Administration — The Inductive Monitoring System (IMS) software utilizes techniques from the fields of model-based reasoning, machine learning, and data mining to build system...

  19. Maintenance Decision Support System, Phase III

    Science.gov (United States)

    2017-09-01

    The main goal of the project was to address barriers that limit NDOTs ability to implement MDSS and MMS systems. The four project tasks included: Task 1: Develop system for tracking sand and/or deicing material usage: A system that tracks where and w...

  20. Measurement and control system for ITER remote maintenance equipment

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  1. Measurement and control system for ITER remote maintenance equipment

    International Nuclear Information System (INIS)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro

    1998-01-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  2. Corrective maintenance support system for nuclear power plants

    International Nuclear Information System (INIS)

    Kakiuchi, Tetsuo

    1996-01-01

    With increase of share of nuclear power generation in electric power supply in Japan, requirement for further safe operation and improvement of economics for the nuclear power plants is promoting. The pressed water type (PWR) nuclear power plant in operation in Japan reaches to 22 sets, application rate of the instruments is 74% as mean value for 7 years since 1989 and in high level, which is due to a result of preventive maintenance in ordinary and periodical inspections. The present state of maintenance at the nuclear power plant is mainly preventive maintenance, which is mainly conducted in a shape of time planning maintenance but partially in a shape of state monitoring maintenance for partial rotating appliances. Concretely speaking, the periodical inspection was planned on a base of daily inspection and a long term program on maintenance, and executed on a base of feedback function to think of the long term program again by evaluating the periodical inspection results. Here were introduced on the monitoring diagnosis and periodical inspection regionalization equipment, fatigue monitoring system, automatic supersonic wave damage inspection equipment for reactor, steam evaporator heat conductive tube inspection equipment, automatic testing equipment for measuring controller, air working valve property testing equipment, as maintaining support system in the PW generation plant. (G.K.)

  3. Time maintenance system for the BMDO MSX spacecraft

    Science.gov (United States)

    Hermes, Martin J.

    1994-01-01

    The Johns Hopkins University Applied Physics Laboratory (APL) is responsible for designing and implementing a clock maintenance system for the Ballistic Missile Defense Organizations (BMDO) Midcourse Space Experiment (MSX) spacecraft. The MSX spacecraft has an on-board clock that will be used to control execution of time-dependent commands and to time tag all science and housekeeping data received from the spacecraft. MSX mission objectives have dictated that this spacecraft time, UTC(MSX), maintain a required accuracy with respect to UTC(USNO) of +/- 10 ms with a +/- 1 ms desired accuracy. APL's atomic time standards and the downlinked spacecraft time were used to develop a time maintenance system that will estimate the current MSX clock time offset during an APL pass and make estimates of the clock's drift and aging using the offset estimates from many passes. Using this information, the clock's accuracy will be maintained by uplinking periodic clock correction commands. The resulting time maintenance system is a combination of offset measurement, command/telemetry, and mission planning hardware and computing assets. All assets provide necessary inputs for deciding when corrections to the MSX spacecraft clock must be made to maintain its required accuracy without inhibiting other mission objectives. The MSX time maintenance system is described as a whole and the clock offset measurement subsystem, a unique combination of precision time maintenance and measurement hardware controlled by a Macintosh computer, is detailed. Simulations show that the system estimates the MSX clock offset to less than+/- 33 microseconds.

  4. AUTOMATIC CONTROL SYSTEM OF WINTER AUTOMOBILE-ROAD MAINTENANCE

    Directory of Open Access Journals (Sweden)

    I. I. Leonovich

    2008-01-01

    Full Text Available In order to ensure a rational usage of financial and material resources directed on winter automobile-road maintenance in theRepublicofBelarusan automatic control system of winter maintenance is under its development and introduction.  The main purpose of the system is to obtain and use meteorological information on the state of a road network that allows to take necessary organizational and technological solutions ensuring safety and continuity of traffic during winter. This system also presupposes to ensure constant control over the state of roadway covering, expenditure of anti-glazed frost materials at all levels of management.The paper considers main aspects pertaining to introduction of the automatic control system of winter maintenance

  5. Radiation analysis of the CIT (Compact Ignition Tokamak) pellet injector system and its impact on personnel access

    Energy Technology Data Exchange (ETDEWEB)

    Selcow, E.C.; Stevens, P.N.; Gomes, I.C.; Gomes, L.M.

    1987-01-01

    Conceptual design of the Compact Ignition Tokamak (CIT) is near completion. This short-pulse ignition experiment is planned to follow the operations of the Tokamak Fusion Test Reactor (TFTR) at the Princeton Plasma Physics Laboratory. The high neutron wall loadings, /approximately/4-5 MW/m/sup 2/, associated with the operation of this device require that neutronics-related issues be considered in the overall system design. Radiation shielding is required for the protection of device components and personnel. A close-in igloo shield has been designed around the periphery of the tokamak structure, and the entire experiment is housed in a circular test cell facility with a radius of /approximately/12 m. The most critical radiation concern in the CIT design process relates to the numerous penetrations in the device. This paper discusses the impact of a major penetration on the design and operations of the CIT pellet injection system. The pellet injector is a major component, which has a line-of-sight penetration through the igloo and test cell wall. All current options for maintenance of the injector require personnel access. A nuclear analysis has been performed to determine the feasibility of hands-on access. Results indicate that personnel access to the pellet injector glovebox is possible. 10 refs., 3 figs., 3 tabs.

  6. Optimal maintenance of a multi-unit system under dependencies

    Science.gov (United States)

    Sung, Ho-Joon

    The availability, or reliability, of an engineering component greatly influences the operational cost and safety characteristics of a modern system over its life-cycle. Until recently, the reliance on past empirical data has been the industry-standard practice to develop maintenance policies that provide the minimum level of system reliability. Because such empirically-derived policies are vulnerable to unforeseen or fast-changing external factors, recent advancements in the study of topic on maintenance, which is known as optimal maintenance problem, has gained considerable interest as a legitimate area of research. An extensive body of applicable work is available, ranging from those concerned with identifying maintenance policies aimed at providing required system availability at minimum possible cost, to topics on imperfect maintenance of multi-unit system under dependencies. Nonetheless, these existing mathematical approaches to solve for optimal maintenance policies must be treated with caution when considered for broader applications, as they are accompanied by specialized treatments to ease the mathematical derivation of unknown functions in both objective function and constraint for a given optimal maintenance problem. These unknown functions are defined as reliability measures in this thesis, and theses measures (e.g., expected number of failures, system renewal cycle, expected system up time, etc.) do not often lend themselves to possess closed-form formulas. It is thus quite common to impose simplifying assumptions on input probability distributions of components' lifetime or repair policies. Simplifying the complex structure of a multi-unit system to a k-out-of-n system by neglecting any sources of dependencies is another commonly practiced technique intended to increase the mathematical tractability of a particular model. This dissertation presents a proposal for an alternative methodology to solve optimal maintenance problems by aiming to achieve the

  7. Screening and monitoring of main diseases a modern strategy of health maintenance in personnel of radiation dangerous plants

    International Nuclear Information System (INIS)

    Takhauov, R. M.; Karpov, A. B.; Kubat, I. I.; Maslyuk, A. I.; Semenova, Y. V.; Freidin, M. B.; Trivozhenko, A. B.; Litvinenko, T. M.

    2004-01-01

    Population health is greatly determined by social factors, mode of life, ecological situation, amount and quality of medical assistance. The analysis of reasons of health troubles increase in population should be done taking into account the above aspects. Main consideration should be given to the development of measures aimed at the highest possible decrease of technogenic and anthropogenic factors influence on a human. Thereupon a complex programme of main diseases screening and monitoring in the personnel of the Siberian Group of Chemical enterprises (SGCE) to be the biggest one among Russian atomic plants has been developed. The purpose of the present paper is to determine main diseases at the earliest stage, the decrease of death rate, as well as the complex estimation of technogenic factor influence on the personnel of radiation dangerous plants nand their offsprings. In this case a long-term effect of low doses seems to be the main risk factor. Taking into account the structure of death rate causes of the population of industrialized countries as well as the spectrum of stochastic effects of ionizing radiation, the screening of cardiac ischemia and arterial hypertension, localization of cancer and congenital malformations have been chosen as the program priorities. Algorithm of instrumental laboratory screening of a particular disease includes modern diagnostic tests. Groups ar risk are formed taking into account a complex of exogenous and endogenous risk factors (age, chronic diseases, bad habits, length of service at a radiation dangerous plant, dose loads, hereditary factors) and on the basis of the screening examination results. The information obtained is entered in the list of database of the Regional Medico dosimetric Register of the SGCE personnel and Seversk residents followed by analysis and monitoring of groups ar risk. (Author) 4 refs

  8. Architecture and Key Techniques of Augmented Reality Maintenance Guiding System for Civil Aircrafts

    Science.gov (United States)

    hong, Zhou; Wenhua, Lu

    2017-01-01

    Augmented reality technology is introduced into the maintenance related field for strengthened information in real-world scenarios through integration of virtual assistant maintenance information with real-world scenarios. This can lower the difficulty of maintenance, reduce maintenance errors, and improve the maintenance efficiency and quality of civil aviation crews. Architecture of augmented reality virtual maintenance guiding system is proposed on the basis of introducing the definition of augmented reality and analyzing the characteristics of augmented reality virtual maintenance. Key techniques involved, such as standardization and organization of maintenance data, 3D registration, modeling of maintenance guidance information and virtual maintenance man-machine interaction, are elaborated emphatically, and solutions are given.

  9. ECONOMIC EFFICIENCY OF VARIOUS QUEEN BEES MAINTENANCE SYSTEMS

    Directory of Open Access Journals (Sweden)

    A POPESCU

    2003-10-01

    Full Text Available The modern queens maintenance systems are based on the use of artificial insemination, queens’ maintenance in the so called „queens bank” , in this way assuring an increased economic efficiency in beekeeping. This study aimed to compare the economic efficiency of the implementation of A.I. to various queen bees maintenance systems. Three alternatives have been taken into account: V1-a queen bee in a cage together with her bees, V2- a queen bank system and V3 – a queen bee in a nucleus. For each queen bee maintenance alternative have been evaluated the most important indicators such as: expenses, incomes, profit, number of marketable inseminated and selected queen bees, honey production, cost/queen, revenue/queen, profit/queen, profit rate. The most effective alternative was the queen bank system assuring 2,400 marketable queen bees and 20 kg honey delivered yearly, USD 12,442 incomes, USD 3,400 expenses, USD 9,042 profit, that is USD 3.77/queen bee and 265.72 % profit rate under the condition as A.I. costs are just USD 1,058, representing 31.1 % of total queen bees maintenance costs.

  10. Operation and maintenance manual for data acquisition system of MIDAS

    International Nuclear Information System (INIS)

    Lee, D. Y.; Park, W. M.; Kim, J. T.; Euh, D. J.

    2001-09-01

    This report describes an operation and maintenance manual of the data acquisition system and the data processing system for the DVI performance evaluation facility, MIDAS. The data acquisition system is implemented with VXI based system of Kinetic Systems TM , and the data processing PC. This report presents the configuration method and operation procedure for the operator. The modification procedure and method for functional extension and performance modification are also included for the future demand

  11. Individual protection of NPP personnel

    International Nuclear Information System (INIS)

    Koshcheev, V.S.; Gol'dshtejn, D.S.; Chetverikova, Z.S.

    1983-01-01

    Specific features of NPP personnel individual protection are considered, mainly with respect to maintenance and repair works on various type reactors. The major concern is given to the selection and application reglamentations of the individual protection system (IPS), employment of sanitary locks, the organization of individual protection under the conditions of a heating microclimate. The ways are specified to the development and introduction of the most effective IPS and improvement of the entire NPP personnel individual protection system with respect to providing the necessary protection effect for maintaining high working capability of the personnel and minimizing the IPS impact on human organism functional systems. The accumulated experience in the personnel individual protection can be applied during construction and operation of NPP's in CMEA member-countries [ru

  12. Energy: Systems for Control, Maintenance, and Storage. A Bibliography.

    Science.gov (United States)

    Thomas, Gerald, Comp.; McKane, Irving, Comp.

    This publication is a bibliography of available periodical literature on specific aspects of energy and today's technology. The Applied Science and Technology Indexes were searched for articles that related to these specific areas: (1) Energy control systems; (2) Maintenance of Energy Systems; and (3) Energy storage. The articles and papers…

  13. Maintenance and adjustment of control systems of central heating turbines

    International Nuclear Information System (INIS)

    Karasyuk, V.A.; Balashov, A.M.

    1994-01-01

    Principles of operation and design of systems of automatic control of steam turbines with controlled heating stem extraction are described. Specific features of maintenance and adjustment of the most common domestic turbines are considered. Recommendations on testing state of turbine control systems and improving reliability of their operation are given. 22 refs., 51 refs

  14. Development of the CAI system for inheritance of maintenance expertise

    International Nuclear Information System (INIS)

    Hanafusa, Hidemitsu; Chigusa, Naoki; Furuta, Kazuo

    2002-01-01

    High quality maintenance is required in order to secure the safety of nuclear power plants. The engineers engaged in maintenance activities have to master various knowledge, including the explicit and tacit knowledge of experienced experts, through education and training. Moreover, it is also very important to prevent these knowledge from getting scattered and lost with a change of generation and to share the knowledge or expertise. The purpose of this study is to develop a support system for the next generation experts to help them master and make use of the knowledge of their predecessors. The knowledge or expertise consist of ''knowledge about the maintenance tasks'', ''knowledge about structure/function of plant system/equipment'', and ''individual knowledge based on trouble experience etc.''. The ways this knowledge could be represented were considered first, then this support system was developed based on such representation. (author)

  15. Manipulator system for remote maintenance of fusion experimental reactor

    International Nuclear Information System (INIS)

    Shibanuma, Kiyoshi; Munakata, Tadashi; Murakami, Shin; Kondoh, Mitsunori.

    1991-01-01

    We have completed the conceptual design for a rail-mounted vehicle type remote maintenance system for the fusion experimental reactor (FER), which will be the first D-T burning reactor in Japan. We have fabricated a 1/5-scale model and confirmed the feasibility of the design. In this system, a rail is deployed into the vessel and supported at four horizontal ports. A vehicle then moves along the rail and handles in-vessel components with manipulators. The advantages of this concept are the high stiffness and high reliability of the rail, and the high mobility of the vehicle for efficient maintenance operations. In the FER, this concept is considered to be the first option for in-vessel maintenance. This paper describes the conceptual design of the system and the feasibility study using the 1/5-scale model. (author)

  16. Public Works Department Maintenance Management Information System

    Science.gov (United States)

    1976-06-01

    Associates, Inc., 1974. 2. Ansoff , Igor H. , Corporate Strategy , McGraw-Hill Book Co., 1965. 3. Anthony, Robert N. , Planning and Control Systems, A...hierarchy of information systems. Ansoff describes management decision-making in three categories as strategic, administrative and operating decisions [Re...involve the firm’s goals, objectives, diversification, product-mix, markets, and growth. Ansoff also notes these other differences: 76 (1) operating

  17. Educating personnel for nuclear technology in Czechoslovakia

    International Nuclear Information System (INIS)

    Otcenasek, P.

    1980-01-01

    The basic preconditions are discussed of educating personnel for nuclear power and nuclear technology in Czechoslovakia. In educating specialists, the high societal significance of nuclear power and the need to obtain qualified personnel for safeguarding safety and reliability of nuclear facilities operation should primarily be borne in mind. The system of training applies not only to operating and maintenance personnel of nuclear power plants but also to fuel and power generation, transport, engineering, building industry, health care, education and other personnel. (J.B.)

  18. Comprehensive Optimal Manpower and Personnel Analytic Simulation System (COMPASS)

    Science.gov (United States)

    2009-10-01

    4 The EDB consists of 4 major components (some of which are re-usable): 1. Metadata Editor ( MDE ): Also considered a leaf node, the metadata...end-user queries via the QB. The EDB supports multiple instances of the MDE , although currently, only a single instance is recommended. 2 Query...the MSB is a central collection of web services, responsible for the authentication and authorization of users, maintenance of the EDB metadata

  19. US Department of Energy Laboratory Accredition Program (DOELAP) for personnel dosimetry systems

    Energy Technology Data Exchange (ETDEWEB)

    Cummings, F.M.; Carlson, R.D.; Loesch, R.M.

    1993-12-31

    Accreditation of personnel dosimetry systems is required for laboratories that conduct personnel dosimetry for the U.S. Department of Energy (DOE). Accreditation is a two-step process which requires the participant to pass a proficiency test and an onsite assessment. The DOE Laboratory Accreditation Program (DOELAP) is a measurement quality assurance program for DOE laboratories. Currently, the DOELAP addresses only dosimetry systems used to assess the whole body dose to personnel. A pilot extremity DOELAP has been completed and routine testing is expected to begin in January 1994. It is expected that participation in the extremity program will be a regulatory requirement by January 1996.

  20. Development of holdup monitor system (HMOS) during facility maintenance

    International Nuclear Information System (INIS)

    Nakamura, Hironobu; Hosoma, Takashi; Tanaka, Izumi

    1999-01-01

    Holdup MOnitor System (HMOS) was developed for the purpose of verifying the constant holdup during facility maintenance in Plutonium Conversion Development Facility (PCDF). The glove box assay system (GBAS; big slab) has been used by inspectors, measures the holdup periodically (i.e. IIV) using coincidence counting. The GBAS couldn't be used for inspection during maintenance period. Because many glove boxes (GB) set in process area had been occupied by large vinyl green-houses due to maintenance. We aimed that the holdup except for the maintenance GB should be constant during maintenance period, the HMOSs were set to 3 GBs. The system had been used from June '98 to July '99 for verification. The HMOS detector is located top/bottom of the GB, counts total neutron variation in the GB continuously. Detector efficiencies are 1.2%(top) and 0.12%(bottom), respectively. The measurement variation is observed up to 1.5%(3σ). The HMOS has high sensitivity 8 to 90g Pu (3σ; In case of 1kg Pu holdup, the sensitivity depends on position in the GB). The movement of equipment or nuclear material from/in the GB can be detected effectively. Though the HMOS observes measurement variation related to humidity in the GB, hygroscopic effect of denitration MOX powder, material/equipment movement and mainly 241 Pu nuclear decay, this system can verify that the holdup is constant qualitatively. As a result, in PCDF, safeguard related to the inventory verification during maintenance period (more than 1 year) were successfully performed using holdup monitor system. (author)

  1. Personnel protective equipment total-encapsulating suit decontamination study using shower systems

    International Nuclear Information System (INIS)

    Menkhaus, D.E.

    1991-01-01

    This report documents an experimental evaluation, conducted at the Idaho National Engineering Laboratory, of a shower-based decontamination station for personnel wearing a Level A, total- encapsulating, chemical-protective suit. The decontamination station is used by personnel when egressing a dry, dusty environment contaminated with transuranic radionuclides. This system has the potential to minimize the risk of spreading the contaminants to clean areas. Two types of shower systems were evaluated, a drench shower and a multi-nozzle shower. A total-encapsulating suit, worn by personnel. was contaminated with soil containing 239 Pu. Pre- shower and post-shower contamination samples were collected and visual observations were made to evaluate the ability of the shower system to remove the contaminated dust and to obtain baseline data useful in designing a shower-based personnel decontamination system. 12 figs., 7 tabs

  2. Development of the personnel training and qualification system of the Russian Federation Nuclear Regulatory Authority

    International Nuclear Information System (INIS)

    Kapralov, E.; Kapralov, Y.; Kozlov, V.

    2006-01-01

    The new personnel training and qualification system is being developed for russian regulatory body, having a very big number of employees and invited experts and widly territorially distributed structure. (author)

  3. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    Energy Technology Data Exchange (ETDEWEB)

    Galabert, Jose, E-mail: jose.galabert@f4e.europa.eu [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); Hopper, Dave [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom); Neviere, Jean-Cristophe [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Nodwell, David [CCFE, Culham Science Centre, Abingdon, OX14 3DB, Oxfordshire (United Kingdom); Pascal, Romain [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Poitevin, Yves; Ricapito, Italo [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); White, Gareth [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom)

    2017-03-15

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q{sub 2} Getter Beds, identifying some design recommendations for their sound maintainability.

  4. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    International Nuclear Information System (INIS)

    Galabert, Jose; Hopper, Dave; Neviere, Jean-Cristophe; Nodwell, David; Pascal, Romain; Poitevin, Yves; Ricapito, Italo; White, Gareth

    2017-01-01

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q_2 Getter Beds, identifying some design recommendations for their sound maintainability.

  5. Computerized asset management and maintenance systems in ST

    CERN Document Server

    Sánchez-Corral, E

    1999-01-01

    The ST division manages and therefore maintains the CERN technical installations. A maintenance database application exists for every technical domain. A total of six different databases were built during the last 10 years and are based on the RAPIER maintenance program. As the Computerized Asset Management and Maintenance Systems (CAMMS) technology has evolved, the RAPIER system has become obsolete. Therefore we are forced to migrate to its latest version, MP5, before the year 2000. The migration path must be defined, leading from the current situation to a fully operational MP5 application. The major elements of each migration path consist in determining the functionality to use, defining the operation of it, adapting and/or creating procedures, converting data and providing training. A migration is always a process of change. The migration presents a unique opportunity to evaluate the current implementations, adapt them to the requirements and exploit the new features offered. Obsolete data and inconsisten...

  6. Tax system for members of the personnel living in France

    CERN Document Server

    HR Department

    2005-01-01

    - DECLARATION OF INCOME FOR 2004 - http://cern.ch/hr-web/internal/generalinfo/impots/impots.asp IMPORTANT Members of the personnel residing in France are requested to follow the instructions (seen and approved by the Tax Office (CDI) in Bellegarde) outlined below. To deal with the large number of requests for personal advice, the Human Resources Department has set up a Helpdesk, Tel. 72838, to direct you to the relevant in-house or outside services. However, as the Human Resources Department cannot speak for the tax authorities and does not have the necessary resources to handle all the problems that are referred to it, members of the personnel are strongly recommended to contact the French tax authorities directly, either at the information desks organised at the places and times given below or via their local tax offices ('Centre des Impôts' and/or 'Trésorerie'). Practical information on the procedures for income declaration and income tax calculation in France can be obtained o...

  7. Tax system for members of the personnel living in France

    CERN Multimedia

    HR Department

    2005-01-01

    - DECLARATION OF INCOME FOR 2004 - http://cern.ch/hr-web/internal/generalinfo/impots/impots.asp IMPORTANT Members of the personnel residing in France are requested to follow the instructions (seen and approved by the Tax Office (CDI) in Bellegarde) outlined below. To deal with the large number of requests for personal advice, the Human Resources Department has set up a Helpdesk, Tel. 72838, to direct you to the relevant in-house or outside services. However, as the Human Resources Department cannot speak for the tax authorities and does not have the necessary resources to handle all the problems that are referred to it, members of the personnel are strongly recommended to contact the French tax authorities directly, either at the information desks organised at the places and times given below or via their local tax offices ('Centre des Impôts' and/or 'Trésorerie'). Practical information on the procedures for income declaration and income tax calculation in France can be obtained on...

  8. A maintenance support system with document handling capability

    International Nuclear Information System (INIS)

    Fukumoto, A.; Tsumura, K.; Fujii, M.; Tai, I.; Makimo, M.; Watanabe, T.

    1990-01-01

    An operation and maintenance support system, called 'Advanced Man-Machine System for Nuclear Power Plants' (MMS-NPP) is under development with the support of the Japanese Government. Taking full advantage of Artificial Intelligence technology, the system aims to enhance the capability of already developed 'Computerized Operator Support System (COSS)' and gives wider and more advanced support for operation and maintenance. With a brief overview of MMS-NPP, this paper describes a support system for plant patrol and equipment inspection. The system gives guidance for plant patrol and for equipment inspection and provides easy access to plant drawings and documents. A unique knowledge acquisition method, utilizing image processing technology, was proposed in building the system

  9. The advantages of reliability centered maintenance for standby safety systems

    International Nuclear Information System (INIS)

    Dam, R.F.; Ayazzudin, S.; Nickerson, J.H.; DeLong, A.I.

    2002-01-01

    Full text: On standby safety systems, nuclear plants have to balance the requirements of demonstrating the reliability of each system, while maintaining the system and plant availability. With the goal of demonstrating statistical reliability, these systems have extensive testing programs, which often makes the system unavailable and this can impact the plant capacity. The inputs to the process are often safety and regulatory related, resulting in programs that provide a high level of scrutiny on the systems being considered. In such cases, the value of the application of a maintenance optimization strategy, such as Reliability Centered Maintenance (RCM), is questioned. Part of the question stems from the use of the word 'Reliability' in RCM, which implies a level of redundancy when applied to a system maintenance program driven by reliability requirements. A deeper look at the RCM process, however, shows that RCM has the goal of ensuring that the system operates 'reliably' through the application of an integrated maintenance strategy. This is a subtle, but important distinction. Although the system reliability requirements are an important part of the strategy evaluation, RCM provides a broader context where testing is only one part of an overall strategy focused on ensuring that component function is maintained through a combination of monitoring technologies (including testing), predictive techniques, and intrusive maintenance strategies. Each strategy is targeted to identify known component degradation mechanisms. The conclusion is that a maintenance program driven by reliability requirements will tend to have testing defined at a frequency intended to support the needed statistics. The testing demonstrates that the desired function is available today. Maintenance driven by functional requirements and known failure causes, as developed through an RCM assessment, will have frequencies tied to industry experience with components and rely on a higher degree of

  10. SOFTM: a software maintenance expert system in Prolog

    DEFF Research Database (Denmark)

    Pau, L.; Negret, J. M.

    1988-01-01

    A description is given of a knowledge-based system called SOFTM, serving the following purposes: (1) assisting a software programmer or analyst in his application code maintenance tasks, (2) generating and updating automatically software correction documentation, (3) helping the end user register......, and on interfacing capabilities of Prolog II to a variety of other languages...

  11. Maintenance management of gas turbine power plant systems ...

    African Journals Online (AJOL)

    Given the abundant availability of gas and the significant installed capacity of the electricity from Gas Turbine Power Systems; effective maintenance of Gas Turbine Power Plants in Nigeria could be the panacea for achieving regular power generation and supply. The study identified environmental impact on the machines, ...

  12. On the semantics of conflict resolution in truth maintenance systems

    NARCIS (Netherlands)

    Jonker, C.M.

    A Truth Maintenance -System (TMS) maintains a consistent state of belief given a set J of justifications, i.e. arguments for belief. To resolve contradictions dependency-directed backtracking is performed. In this paper we introduce a method that can, be used to track all

  13. Experiences with an integrated management system for aircraft maintenance

    International Nuclear Information System (INIS)

    Huber, U.

    1993-01-01

    For 20 years, SWISSAIR has employed an integrated information system for aircraft maintenance. To date, a wide range of functions has been set up in their own development. For the future SWISSAIR is increasingly basing on the use of SAP/standard software packages. 10 figs

  14. Maintenance optimization of the Ignalina NPP safety systems

    International Nuclear Information System (INIS)

    Zuokas, D.; Augutis, J.

    2000-01-01

    This paper represents some theses and mathematical approach to optimization of technical specification problems of the diesel generators system (DGS) at the Ignalina NPP (INPP) in Lithuania. Analysis unites three chapters, each attributed to the solving of related problems: dependency of the Core Damage Frequency (CDF) on DGS test interval (Chapter 2), analysis and comparison of two different maintenance strategies for DGS (Chapter 3), DGS test interval's optimisation (averaged loss function minimisation) taking into consideration maintenance and DGS failure's consequence costs (Chapter 4). The mathematical model was developed which lets to estimate DGS failure probability, the averaged loss function value and study the influence of different parameters into final results. (author)

  15. Systems Maintenance Automated Repair Tasks (SMART)

    Science.gov (United States)

    Schuh, Joseph; Mitchell, Brent; Locklear, Louis; Belson, Martin A.; Al-Shihabi, Mary Jo Y.; King, Nadean; Norena, Elkin; Hardin, Derek

    2010-01-01

    SMART is a uniform automated discrepancy analysis and repair-authoring platform that improves technical accuracy and timely delivery of repair procedures for a given discrepancy (see figure a). SMART will minimize data errors, create uniform repair processes, and enhance the existing knowledge base of engineering repair processes. This innovation is the first tool developed that links the hardware specification requirements with the actual repair methods, sequences, and required equipment. SMART is flexibly designed to be useable by multiple engineering groups requiring decision analysis, and by any work authorization and disposition platform (see figure b). The organizational logic creates the link between specification requirements of the hardware, and specific procedures required to repair discrepancies. The first segment in the SMART process uses a decision analysis tree to define all the permutations between component/ subcomponent/discrepancy/repair on the hardware. The second segment uses a repair matrix to define what the steps and sequences are for any repair defined in the decision tree. This segment also allows for the selection of specific steps from multivariable steps. SMART will also be able to interface with outside databases and to store information from them to be inserted into the repair-procedure document. Some of the steps will be identified as optional, and would only be used based on the location and the current configuration of the hardware. The output from this analysis would be sent to a work authoring system in the form of a predefined sequence of steps containing required actions, tools, parts, materials, certifications, and specific requirements controlling quality, functional requirements, and limitations.

  16. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  17. Development of personnel dose control system and whole body counter system

    International Nuclear Information System (INIS)

    Ooki, Yasushi; Harato, Kenji

    2005-01-01

    We delivered Personnel Dose Control System to Higashidohri nuclear plant of Tohoku Electric Power Company, in November 2004. In this system development, we automated the registration of radiation worker with close link between this system and Whole Body Counter System. In addition, this system enables the user to reduce workload for accumulation and notification of personal exposure data, because we adopted the system to extract the data effectively operating the terminal PC which the associate company gets ready in their office. We also delivered Whole body Counter System in December 2004, which was developed to measure internal exposure without feeling of oppression in chair-style device for the first time in Japan. This system enables non-operator system for measurement allowing workers to operate by themselves. (author)

  18. CLASSIFICATION OF THE MGR MAINTENANCE AND SUPPLY SYSTEM

    International Nuclear Information System (INIS)

    J.A. Ziegler

    1999-01-01

    The purpose of this analysis is to document the Quality Assurance (QA) classification of the Monitored Geologic Repository (MGR) maintenance and supply system structures, systems and components (SSCs) performed by the MGR Safety Assurance Department. This analysis also provides the basis for revision of YMP/90-55Q, Q-List (YMP 1998). The Q-List identifies those MGR SSCs subject to the requirements of DOE/RW-0333P, ''Quality Assurance Requirements and Description'' (QARD) (DOE 1998)

  19. An Automated System for the Maintenance of Multiform Documentation

    Science.gov (United States)

    Rousseau, Bertrand; Ruggier, Mario; Smith, Matthiew

    Software documentation for the user often exists in several forms including paper, electronic, on-line help, etc. We have build a system to help with the writing and maintenance of such kinds of documentation which relies on the FrameMaker product. As an example, we show how it is used to maintain the ADAMO documentation, delivered in 4 incarnations on paper, WWW hypertext, KUIP and running examples. The use of the system results in both time saving and quality improvements.

  20. Use of passive systems to improve plant operation and maintenance

    International Nuclear Information System (INIS)

    Shah, D.

    2000-01-01

    In a deregulated future, a utility's strength will depend on its ability to be cost competitive in the marketplace. However, the competitive advantage of nuclear power will depend on each owner's ability to reduce Operating and Maintenance (O and M) costs without sacrificing nuclear safety. The use of passive systems (i.e., systems without any moving parts) can reduce plant O and M costs while increasing safety in nuclear power plants. (author)

  1. Personnel protection and beam containment systems for the 3 GeV Injector

    International Nuclear Information System (INIS)

    Yotam, R.; Cerino, J.; Garoutte, R.; Hettel, R.; Horton, M.; Sebek, J.; Benson, E.; Crook, K.; Fitch, J.; Ipe, N.; Nelson, G.; Smith, H.

    1991-01-01

    The 3 GeV Injector is the electron beam source for the SPEAR Storage Ring, and its personnel safety system was designed to protect personnel from both radiation exposure and electrical hazards. The Personnel Protection System (PPS) was designed and implemented with complete redundancy and is a relay based interlock system completely independent from the machine protection system. A comprehensive monitoring of the system status, and control of the Injector PPS from the SPEAR Control Room via the control computer is a feature. The Beam Containment System (BCS) is based on beam current measurements along the Linac and on Beam Shut Off Ion Chambers (BSOIC) installed outside the Linac, at several locations around the Booster, and around the SPEAR storage ring. An outline of the design criteria is presented with more detailed description of the philosophy of the PPS logic and the BCS

  2. Psychosocial work strain of maintenance personnel during annual outage and normal operation in a nuclear power plant

    International Nuclear Information System (INIS)

    Jacobsson, L.; Svensson, O.

    1991-01-01

    This paper reports on a study which evaluates psychosocial work demands during the annual outage for a maintenance work group in a nuclear power plant. The study is based on a stress paradigm and it has been asserted that increased work strain would have a negative effect on performance. Nineteen workers, aged 20-55 years, participated in the study. The subjects filled out a questionnaire comparing work strain during annual outage and normal operation. During the outage period a 3-shift 24-hour work schedule, including nightwork, was used (working hours during normal operation was 7-16). Increased demands on concentration and vigilance, increased time pressure and strain on social relations within the group were found to characterize work during annual outage. Interestingly, for specific work tasks an association was found between the risk of making errors and high psychological workload. Increased work strain, shiftwork including nightwork and reduced social support are important psychosocial risk factors that might contribute to human error during the outage period

  3. Personnel Selection Influences on Remotely Piloted Aircraft Human-System Integration.

    Science.gov (United States)

    Carretta, Thomas R; King, Raymond E

    2015-08-01

    Human-system integration (HSI) is a complex process used to design and develop systems that integrate human capabilities and limitations in an effective and affordable manner. Effective HSI incorporates several domains, including manpower, personnel and training, human factors, environment, safety, occupational health, habitability, survivability, logistics, intelligence, mobility, and command and control. To achieve effective HSI, the relationships among these domains must be considered. Although this integrated approach is well documented, there are many instances where it is not followed. Human factors engineers typically focus on system design with little attention to the skills, abilities, and other characteristics needed by human operators. When problems with fielded systems occur, additional training of personnel is developed and conducted. Personnel selection is seldom considered during the HSI process. Complex systems such as aviation require careful selection of the individuals who will interact with the system. Personnel selection is a two-stage process involving select-in and select-out procedures. Select-in procedures determine which candidates have the aptitude to profit from training and represent the best investment. Select-out procedures focus on medical qualification and determine who should not enter training for medical reasons. The current paper discusses the role of personnel selection in the HSI process in the context of remotely piloted aircraft systems.

  4. The maintenance record of the KSTAR helium refrigeration system

    Energy Technology Data Exchange (ETDEWEB)

    Moon, K. M.; Joo, J. J.; Kim, N. W. [National Fusion Research Institute, Daejeon (Korea, Republic of); and others

    2013-12-15

    Korea Superconducting Tokamak Advanced Research (KSTAR) has a helium refrigeration system (HRS) with the cooling capacity of 9 kW at 4.5 K. Main cold components are composed of 300 tons of superconducting (SC) magnets, main cryostat thermal shields, and SC current feeder system. The HRS comprises six gas storage tanks, a liquid nitrogen tank, the room temperature compression sector, the cold box (C/B), the 1st stage helium distribution box (DB no.1), the PLC base local control system interconnected to central control tower and so on. Between HRS and cold components, there is another distribution box (DB#2) nearby the KSTAR device. The entire KSTAR device was constructed in 2007 and has been operated since 2008. This paper will present the maintenance result of the KSTAR HRS during the campaign and discuss the operation record and maintenance history of the KSTAR HRS.

  5. British Coal Compass project summary: colliery based manpower, personnel, scheduling and safety systems and processes

    Energy Technology Data Exchange (ETDEWEB)

    Long, V. [Oasis Group plc (United Kingdom)

    1995-12-01

    In early 1991 British Coal reviewed its existing personnel and manpower planning systems and concluded they were inadequate for the future needs of the business. British Coal`s strategy to continue to improve productivity required payroll and personnel related systems which could support new flexible working hours and variable shifts. This strategy would enable machine running time to be increased, leading to improved productivity levels. The Corporation chose to install a distributed, integrated computer system, code named `Compass` to devolve many of the responsibilities for the management and payment of the industrial workforce from Corporate headquarters` functions to all its collieries. The system consists of eight main software systems: an on-line, real-time time and attendance system; a ristering system; a colliery personnel system; a strategic manpower planning system; a local data capture system; a central, core payroll system; a corporate personnel database; and a fail-safe, resilience system. The article describes the technology used and discusses the benefits of the system which started operations in autumn 1993. 3 figs.

  6. 48 CFR 1852.246-70 - Mission Critical Space System Personnel Reliability Program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Mission Critical Space... CONTRACT CLAUSES Texts of Provisions and Clauses 1852.246-70 Mission Critical Space System Personnel Reliability Program. As prescribed in 1846.370(a), insert the following clause: Mission Critical Space System...

  7. THE DEVELOPMENT OF A PERFORMANCE MEASUREMENT SYSTEM FOR MAINTENANCE

    Directory of Open Access Journals (Sweden)

    J.K. Visser

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Business enterprises are under increasing pressure to become internationally competitive due to globalisation. World-class companies from abroad can now easily compete with local companies, introducing high quality products and services to the local community and industry. The pace of technological change is also forcing companies to increase productivity and to become more cost effective. Performance management is part of the strategic management process in the business enterprise and the maintenance department therefore has to address this as part of the strategy formulation for the maintenance function. This paper outlines the strategic management process that is required in the maintenance department and defines a systematic process to develop a performance measurement system for maintenance.

    AFRIKAANSE OPSOMMING: Besigheidsondernemings is onder toenemende druk om internasionaal kompeterend te word weens globalisering. Wêreldklas maatskappye kan nou maklik met plaaslike maatskappye meeding deur hoë kwaliteit produkte en dienste aan die plaaslike gemeenskap en nywerheid te lewer. Die tempo van tegnologiese verandering dwing maatskappye ook om produktiwiteit te verhoog en meer koste-effektief te word. Prestasiebestuur is deel van strategiese bestuur in 'n onderneming en die instandhoudingsafdeling moet derhalwe prestasiebestuur aanspreek as deel van die ontwikkeling van strategie vir die instandhoudingsfunksie. Hierdie artikel bespreek die strategiese bestuursproses soos benodig in die instandhoudingsafdeling en stel 'n sistematiese proses voor vir die ontwikkeling van 'n prestasiemetingstelsel vir instandhouding.

  8. Support and Maintenance of the International Monitoring System network

    Science.gov (United States)

    Pereira, Jose; Bazarragchaa, Sergelen; Kilgour, Owen; Pretorius, Jacques; Werzi, Robert; Beziat, Guillaume; Hamani, Wacel; Mohammad, Walid; Brely, Natalie

    2014-05-01

    The Monitoring Facilities Support Section of the Provisional Technical Secretariat (PTS) has as its main task to ensure optimal support and maintenance of an array of 321 monitoring stations and 16 radionuclide laboratories distributed worldwide. Raw seismic, infrasonic, hydroacoustic and radionuclide data from these facilities constitutes the basic product delivered by the International Monitoring System (IMS). In the process of maintaining such a wide array of stations of different technologies, the Support Section contributes to ensuring station mission capability. Mission capable data availability according to the IMS requirements should be at least 98% annually (no more than 7 days down time per year per waveform stations - 14 continuous for radionuclide stations) for continuous data sending stations. In this presentation, we will present our case regarding our intervention at stations to address equipment supportability and maintainability, as these are particularly large activities requiring the removal of a substantial part of the station equipment and installation of new equipment. The objective is always to plan these activities while minimizing downtime and continuing to meet all IMS requirements, including those of data availability mentioned above. We postulate that these objectives are better achieved by planning and making use of preventive maintenance, as opposed to "run-to-failure" with associated corrective maintenance. We use two recently upgraded Infrasound Stations (IS39 Palau and IS52 BIOT) as a case study and establish a comparison between these results and several other stations where corrective maintenance was performed, to demonstrate our hypothesis.

  9. Development of Tokai reprocessing plant maintenance support system (TORMASS) in the Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Shimizu, Kazuyuki; Tomita, Tsuneo; Sakai, Katsumi

    2008-01-01

    The maintenance work of many equipments such as mechanical, electrical and instrumentations installed in Tokai reprocessing plant has been performed more then 10,000 times per year and about 90% of maintenances were preventive work. For the maintenance management, optimization of maintenance information is required. Therefore, Tokai Reprocessing Plant Maintenance Support System (TORMASS) was developed from 1985 to 1992 as the aim of construction for suitable maintenance management system. About 24,000 equipments of specifications and about 261,000 maintenance detail were registered in this system. TORMASS has been used for the repair, inspection and replacement of equipment since 1992. (author)

  10. Tele-maintenance 'intelligent' system for technical plants result management

    International Nuclear Information System (INIS)

    Concetti, Massimo; Cuccioletta, Roberto; Fedele, Lorenzo; Mercuri, Giampiero

    2009-01-01

    The management of technical plant for productivity and safety is generally a complex activity, particularly when many plants distributed in the territory are considered (i.e. the more and more frequent case of outsourced plants maintenance by specialized companies), granted quality and cost results are required (i.e. the case of some rather innovative contract solutions) and the technology involved is heterogeneous and innovative (i.e. electro-mechanical plants). In order to efficiently achieve the above aims an 'intelligent' maintenance-management system for the distant monitoring and controlling by a remote control center has been developed. The so-called GrAMS (granted availability management system) system is conceived to give to organizations involved in technical-industrial plants management the possibility to tend to a 'well-known availability' and 'zero-failures' management. In particular, this study deals with the diagnostic aspects and safety level of technical plants (such as elevators, thermo-technical plants, etc.), and with the involvement of ad hoc designed software analysis tools based on neural networks and reliability indicators. Part of the research dealing with the tele-maintenance intelligent system has been financed by the Italian High Institute for Safety (ISPESL) and led to the development of a pre-industrial prototype whose realization and testing is here described

  11. Cold Vacuum Drying facility personnel monitoring system design description

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) instrument air (IA) system that provides instrument quality air to the CVDF. The IA system provides the instrument quality air used in the process, HVAC, and HVAC instruments. The IA system provides the process skids with air to aid in the purging of the annulus of the transport cask. The IA system provides air for the solenoid-operated valves and damper position controls for isolation, volume, and backdraft in the HVAC system. The IA system provides air for monitoring and control of the HVAC system, process instruments, gas-operated valves, and solenoid-operated instruments. The IA system also delivers air for operating hand tools in each of the process bays

  12. Server application for automated management training system of NPP personnel

    International Nuclear Information System (INIS)

    Poplavskij, I.A.; Pribysh, P.I.; Karpej, A.L.

    2016-01-01

    This paper describer the server side of automated management training system. This system will increase the efficiency of planning and accounting training activities, simplifies the collecting the necessary documentation and analysis of the results. (authors)

  13. 75 FR 35689 - System Personnel Training Reliability Standards

    Science.gov (United States)

    2010-06-23

    ... planning staff at control areas and reliability coordinators concerning power system characteristics and... Coordination--Staffing). \\11\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, Federal... American bulk electric system are competent to perform those reliability-related tasks.\\22\\ The proposed...

  14. 75 FR 72664 - System Personnel Training Reliability Standards

    Science.gov (United States)

    2010-11-26

    ...--Staffing). \\2\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 72 FR 16416 (Apr... on the North American bulk electric system are competent to perform those reliability-related tasks... PER-004-2 will achieve a significant improvement in the reliability of the Bulk- Power System and...

  15. Disposable Multi-Sensor Unattended Ground Sensor Systems for Detecting Personnel (Systemes de detection multi-capteurs terrestres autonome destines a detecter du personnel)

    Science.gov (United States)

    2015-02-01

    the set of DCT coefficients for all the training data corresponding to the people. Then, the matrix ][ pX can be written as: ][][][ −+ −= ppp XXX ...deployed on two types of ground conditions. This included ARL multi-modal sensors, video and acoustic sensors from the Universities of Memphis and...Mississippi, SASNet from Canada, video from Night Vision Laboratory and Pearls of Wisdom system from Israel operated in conjunction with ARL personnel. This

  16. Operation and maintenance support expert systems for BWR nuclear power plants

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo; Hayakawa, Hiroyasu; Fukutomi, Shigeki

    1990-01-01

    Toshiba has been developing expert systems for operation and maintenance support in BWRs. These expert systems are designed to be integrated with conventional plant monitoring systems, and maintenance management systems to provide both comprehensive and powerful support capabilities. Some of these expert systems are already being used on a trial basis both within Toshiba and in electric power utility companies. This paper describes expert systems for the support of plant and equipment monitoring, maintenance scheduling, and maintenance work procedure planning. (author)

  17. An optimal dynamic interval preventive maintenance scheduling for series systems

    International Nuclear Information System (INIS)

    Gao, Yicong; Feng, Yixiong; Zhang, Zixian; Tan, Jianrong

    2015-01-01

    This paper studies preventive maintenance (PM) with dynamic interval for a multi-component system. Instead of equal interval, the time of PM period in the proposed dynamic interval model is not a fixed constant, which varies from interval-down to interval-up. It is helpful to reduce the outage loss on frequent repair parts and avoid lack of maintenance of the equipment by controlling the equipment maintenance frequency, when compared to a periodic PM scheme. According to the definition of dynamic interval, the reliability of system is analyzed from the failure mechanisms of its components and the different effects of non-periodic PM actions on the reliability of the components. Following the proposed model of reliability, a novel framework for solving the non-periodical PM schedule with dynamic interval based on the multi-objective genetic algorithm is proposed. The framework denotes the strategies include updating strategy, deleting strategy, inserting strategy and moving strategy, which is set to correct the invalid population individuals of the algorithm. The values of the dynamic interval and the selections of PM action for the components on every PM stage are determined by achieving a certain level of system availability with the minimum total PM-related cost. Finally, a typical rotary table system of NC machine tool is used as an example to describe the proposed method. - Highlights: • A non-periodic preventive maintenance scheduling model is proposed. • A framework for solving the non-periodical PM schedule problem is developed. • The interval of non-periodic PM is flexible and schedule can be better adjusted. • Dynamic interval leads to more efficient solutions than fixed interval does

  18. Risk-based and maintenance systems for steam turbines

    International Nuclear Information System (INIS)

    Fujiyama, K.; Nagai, S.; Akikuni, Y.; Fujiwara, T.; Furuya, K.; Matsumoto, S.; Takagi, K.; Kawabata, T.

    2003-01-01

    The risk-based maintenance (RBM) system has been developed for steam turbine plants coupled with the quick inspection systems. The RBM system utilizes the field failure and inspection database accumulated over 30 years. The failure modes are determined for each component of steam turbines and the failure scenarios are described as event trees. The probability of failure is expressed in the form of unreliability functions of operation hours or start-up cycles through the cumulative hazard function method. The posterior unreliability is derived from the field data analysis according to the inspection information. Quick inspection can be conducted using air-cooled borescope and heat resistant ultrasonic sensors even if the turbine is not cooled down sufficiently. Another inspection information comes from degradation and damage measurement. The probabilistic life assessment using structural analysis and statistical material properties, the latter is estimated from hardness measurement, replica observation and embrittlement measurement. The risk function is calculated as the sum product of unreliability functions and expected monetary loss as the consequence of failure along event trees. The optimum maintenance plan is determined among simulated scenarios described through component breakdown trees, life cycle event trees and risk functions. Those methods are effective for total condition assessment and economical maintenance for operating plants. (orig.)

  19. Risk-based inspection and maintenance systems for steam turbines

    International Nuclear Information System (INIS)

    Fujiyama, Kazunari; Nagai, Satoshi; Akikuni, Yasunari; Fujiwara, Toshihiro; Furuya, Kenichiro; Matsumoto, Shigeru; Takagi, Kentaro; Kawabata, Taro

    2004-01-01

    The risk-based maintenance (RBM) system has been developed for steam turbine plants coupled with the quick inspection systems. The RBM system utilizes the field failure and inspection database accumulated over 30 years. The failure modes are determined for each component of steam turbines and the failure scenarios are described as event trees. The probability of failure is expressed in the form of unreliability functions of operation hours or start-up cycles through the cumulative hazard function method. The posterior unreliability is derived from the field data analysis according to the inspection information. Quick inspection can be conducted using air-cooled borescope and heat resistant ultrasonic sensors even if the turbine is not cooled down sufficiently. Another inspection information comes from degradation and damage measurement. The probabilistic life assessment using structural analysis and statistical material properties, the latter is estimated from hardness measurement, replica observation and embrittlement measurement. The risk function is calculated as the sum product of unreliability functions and expected monetary loss as the consequence of failure along event trees. The optimum maintenance plan is determined among simulated scenarios described through component breakdown trees, life cycle event trees and risk functions. Those methods are effective for total condition assessment and economical maintenance for operating plants

  20. Assessment of building maintenance in Nigerian university system ...

    African Journals Online (AJOL)

    Building maintenance involves preserving a building so that it can retain its economic value ... maintenance policy by employing outsourcing maintenance services. ... services including the use of information and communication technology.

  1. Construction of maintenance management system of atomic power plant

    International Nuclear Information System (INIS)

    Shibasaki, Naofumi; Ookawara, Koumei; Suzuki, Masashi

    2005-01-01

    This maintenance management system has the retrieval function of the variation conditions with the three dimensions models and repair history. The structure of system consists of the management data retrieval tool and the total facilities repair plan support tool. The system has the management function of facilities information, a bird's-eye view of three dimensions models, data recording function, output of various kinds of registers, pre-estimation of degradation and the repair plan support function. When the total facilities repair plan support tool is selected, the variation conditions of facilities, repair history and repair cost are shown, and each part of facility and materials is able to display. (S.Y.)

  2. Maintenance and Recovery of Water System for Injection (WFI)

    International Nuclear Information System (INIS)

    Wan Anuar Wan Awang; Ahmad Firdaus Jalil; Wan Mohd Firdaus Wan Ishak

    2015-01-01

    Water system for injection (WFI) is one of the main component in manufacturing pharmaceutical materials and radiopharmaceuticals. This system accredited in 2005. Water quality produced analyzed and give the unsatisfied results. The operation of WFI was stopped temporarily due to technical problems. In 2013, recovery works were implemented with budget of RM 226,500.00. Comprehensive maintenance were implemented by Rykertech (Asia) Sdn. Bhd. With duration of 24 months (October 2014 until September 2016) with cost RM 473,550.00. Now, this system operated in good condition and produced water that meet with the specifications. (author)

  3. Rigid hoist articulated grapple system development for enhanced remote maintenance

    International Nuclear Information System (INIS)

    Witham, C.; White, P.; Garin, J.

    1979-01-01

    Remote maintenance and repair within nuclear environments have become more demanding of remote manipulation equipment in the last few years. A deficiency exists in the array of tools available for dexterous operations of loads in the 180-kg range. The development of a manipulation system with enhanced operator controls is discussed. This system is a six-degree-of-freedom manipulator with bilateral servo control. It is to be attached to a mobile support boom in order to operate throughout the nuclear cell. The manipulator is intended to work in conjunction with light duty servomanipulators, overhead crane systems, and through-the-wall mechanical master slaves

  4. Review of Operation and Maintenance Support Systems for Research Reactors

    International Nuclear Information System (INIS)

    Jin, Kyungho; Heo, Gyunyoung; Park, Jaekwan

    2014-01-01

    Operation support systems do not directly control the plant but it can aid decision making itself by obtaining and analyzing large amounts of data. Recently, the demand of research reactor is growing and the need for operation support systems is increasing, but it has not been applied for research reactors. This study analyzes operation and maintenance support systems of NPPs and suggests appropriate systems for research reactors based on analysis. In this paper, operation support systems for research reactors are suggested by comparing with those of power reactors. Currently, research reactors do not cover special systems in order to improve safety and operability in comparison with power reactors. Therefore we expect to improve worth to use by introducing appropriate systems for research reactors. In further research, we will develop an appropriate system such as applications or tools that can be applied to the research reactor

  5. Client application for automated management training system of NPP personnel

    International Nuclear Information System (INIS)

    Pribysh, P.I.; Poplavskij, I.A.; Karpej, A.L.

    2016-01-01

    This paper describes the client side of automated management training system. This system will optimize the speed of the organization and quality of the training plan; reduce the time of collecting the necessary documentation and facilitate the analysis of the results. (authors)

  6. 25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?

    Science.gov (United States)

    2010-04-01

    ... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.806 What is an IRR Transportation Facilities Maintenance Management System? An IRR Transportation Facilities Maintenance Management... 25 Indians 1 2010-04-01 2010-04-01 false What is an IRR Transportation Facilities Maintenance...

  7. Optimal Inspection and Maintenance Strategies for Structural Systems

    DEFF Research Database (Denmark)

    Sommer, A. M.

    The aim of this thesis is to give an overview of conventional and optimal reliability-based inspection and maintenance strategies and to examine for specific structures how the cost can be reduced and/or the safety can be improved by using optimal reliability-based inspection strategies....... For structures with several almost similar components it is suggested that individual inspection strategies should be determined for each component or a group of components based on the reliability of the actual component. The benefit of this procedure is assessed in connection with the structures considered....... Furthermore, in relation to the calculations performed the intention is to modify an existing program for determination of optimal inspection strategies. The main purpose of inspection and maintenance of structural systems is to prevent or delay damage or deterioration to protect people, environment...

  8. HOSPITAL KANBAN SYSTEM IMPLEMENTATION: EVALUATING SATISFACTION OF NURSING PERSONNEL

    Directory of Open Access Journals (Sweden)

    Aguilar-Escobar, Víctor G.

    2015-09-01

    Full Text Available Literature on healthcare supply chain management has shown that the kanban system can provide significant benefits. However, very few benefits have been empirically demonstrated and the extent of each remains unknown. This study aims to measure nurses’ satisfaction with kanban systems in logistics of medical consumables and assesses possible advantages and differences among user groups through an anonymous survey at Hospital Universitario Virgen Macarena of Seville, Spain. Treatment of responses included an exploratory factor analysis, and a CAPTCA analysis. The results showed a high level of satisfaction for each aspect of the kanban system. Moreover, it highlighted the differences of opinion between groups of individuals according to workplace, nursing units, job category, seniority, age and kanban training. The exploratory factor analysis revealed that two factors underlie the collected assessments: the inherent advantages of a kanban system, and the logistics system performance as a whole. Thus, hospital managers should promote the implementation of kanban systems, since it increases nurses’ satisfaction and provides significant benefits.

  9. Deployment Efficiency and Barrier Effectiveness Testing of a Temporary Anti-Personnel (TAP) Barrier System.

    Energy Technology Data Exchange (ETDEWEB)

    Allen, David James [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hedrick, Charles D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Martinez, Ruben [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-02-01

    This report documents tests conducted by Sandia National Laboratories (SNL) on behalf of the U.S. Department of State to evaluate a temporary anti-personnel (TAP) barrier system developed by Mitigation Technologies. For this, the SNL Denial and Structural Assessment department developed a test protocol for the evaluation of the TAP barrier system on the basis of deployment efficiency and barrier effectiveness against a riotous/mob attack threat. The test protocol was then executed by SNL personnel and the results of the testing are documented.

  10. British Coal Compass Project summary: colliery based manpower, personnel, scheduling and safety systems and processes

    Energy Technology Data Exchange (ETDEWEB)

    Long, V. (Oasis Group PLC (United Kingdom))

    1994-01-01

    In early 1991, British Coal reviewed its existing personnel and manpower planning systems and concluded they were inadequate for the future needs of the business. With wages accounting for 40% British Coal's 1990/91 operational costs, the Corporation targeted manpower management as an area to deliver further improvements. British Coal's strategy to continue to improve productivity required payroll and personnel related systems which could support new flexible working hours and variable shifts. This strategy would enable machine running time to be increased, leading to improved productivity levels. 3 figs.

  11. A knowledge based system for training radiation emergency response personnel

    International Nuclear Information System (INIS)

    Kuriakose, K.K.; Peter, T.U.; Natarajan, A.

    1992-01-01

    One of the important aspects of radiation emergency preparedness is to impart training to emergency handling staff. Mock exercises are generally used for this purpose. But practical considerations limit the frequency of such exercises. A suitably designed computer software can be effectively used to impart training. With the advent of low cost personal computers, the frequency with which the training programme can be conducted is unlimited. A computer software with monotonic behaviour is inadequate for such training. It is necessary to provide human like tutoring capabilities. With the advances in knowledge based computer systems, it is possible to develop such a system. These systems have the capability of providing individualized training. This paper describes the development of such a system for training and evaluation of agencies associated with the management of radiation emergency. It also discusses the utility of the software as a general purpose tutor. The details required for the preparation of data files and knowledge base files are included. It uses a student model based on performance measures. The software is developed in C under MS-DOS. It uses a rule based expert system shell developed in C. The features of this shell are briefly described. (author). 5 refs

  12. Development of the predictive maintenance system prototype for the rod control system

    International Nuclear Information System (INIS)

    Lim, H. S.; Hong, H. P.; Koo, J. M.; Kim, Y. B.; Han, H. W.

    2003-01-01

    The demand for safety and reliability of Nuclear Power Plants (NPPs) has been constantly increasing and economical operation is also an important issue. Developing and adopting predictive maintenance technology for the major systems or equipment is considered as a way to achieve these goals. This paper describes the development of a predictive maintenance system prototype for the Rod Control System, which adopts an advanced methodology. Bayesian Belief Networks (BBN) has been adopted for the real time fault diagnosis and prediction of the system. Through a simulation test, it was confirmed that the prototype monitors and secures sound operability of rod drive mechanism and its control system, and also provides the predictive maintenance information

  13. Standard hydrogen monitoring system-B operation and maintenance manual

    International Nuclear Information System (INIS)

    Bender, R.M.

    1995-01-01

    The purpose of this document is to provide information for the operation and maintenance of the Standards Hydrogen Monitoring System-B (SHMS-B) used in the 200E and 200W area tank farms on the Hanford site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. The primary function of the SHMS-B is to monitor specifically for hydrogen in the waste tank vapor space which may also contain unknown quantities of other gaseous constituents

  14. An information system supporting design for reliability and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Rit, J.F.; Beraud, M.T

    1997-12-31

    EDF is currently developing a methodology to integrate availability, operating experience and maintenance in the design of power plants. This involves studies that depend closely on the results and assumptions of each other about the reliability and operations of the plant. Therefore a support information system must be carefully designed. Concurrently with development of the methodology, a research oriented information system was designed and built. It is based on the database model of a logistic support repository that we tailored to our needs. (K.A.) 10 refs.

  15. An information system supporting design for reliability and maintenance

    International Nuclear Information System (INIS)

    Rit, J.F.; Beraud, M.T.

    1997-01-01

    EDF is currently developing a methodology to integrate availability, operating experience and maintenance in the design of power plants. This involves studies that depend closely on the results and assumptions of each other about the reliability and operations of the plant. Therefore a support information system must be carefully designed. Concurrently with development of the methodology, a research oriented information system was designed and built. It is based on the database model of a logistic support repository that we tailored to our needs. (K.A.)

  16. RTEMS CENTRE- Support and Maintenance CENTRE to RTEMS Operating System

    Science.gov (United States)

    Silva, H.; Constantino, A.; Coutunho, M.; Freitas, D.; Faustino, S.; Mota, M.; Colaço, P.; Zulianello, M.

    2008-08-01

    RTEMS stands for Real-Time Operating System for Multiprocessor Systems. It is a full featured Real Time Operating System that supports a variety of open APIs and interface standards. It provides a high performance environment for embedded applications, including a fixed-priority preemptive/non-preemptive scheduler, a comprehensive set of multitasking operations and a large range of supported architectures. Support and maintenance CENTRE to RTEMS operating system (RTEMS CENTRE) is a joint initiative of ESA-Portugal Task force, aiming to build a strong technical competence in the space flight (on- board) software, to offer support, maintenance and improvements to RTEMS. This paper provides a high level description of the current and future activities of the RTEMS CENTRE. It presents a brief description of the RTEMS operating system, a description of the tools developed and distributed to the community [1] and the improvements to be made to the operating system, including facilitation for the qualification of RTEMS (4.8.0) [2] for the space missions.

  17. Information system for personnel work distribution in Kaunas Maironis gymnasium

    OpenAIRE

    Ivanauskaitė, Eglė

    2005-01-01

    This information technology master degree work. In this work it is made research of the task of teacher's work distribution acording to schoolchildren's individual studying plans. In this work it it analyzed the process of teacher's work distribution and their information needs. This information system was created in MS Visio surroundings and realized with MS SQL Server and VBA implements.

  18. Deficiency within pavement Maintenance Organization in Tanzania ...

    African Journals Online (AJOL)

    In addition, the rules and regulations of the public administrative system do not allow for an effective and efficient management of road maintenance. Lack of equipment and adequate qualified personnel in the field of road maintenance is too an added deficiency. As a consequence, Tanzania has started to put road ...

  19. A dynamic predictive maintenance policy for complex multi-component systems

    International Nuclear Information System (INIS)

    Van Horenbeek, Adriaan; Pintelon, Liliane

    2013-01-01

    The use of prognostic methods in maintenance in order to predict remaining useful life is receiving more attention over the past years. The use of these techniques in maintenance decision making and optimization in multi-component systems is however a still underexplored area. The objective of this paper is to optimally plan maintenance for a multi-component system based on prognostic/predictive information while considering different component dependencies (i.e. economic, structural and stochastic dependence). Consequently, this paper presents a dynamic predictive maintenance policy for multi-component systems that minimizes the long-term mean maintenance cost per unit time. The proposed maintenance policy is a dynamic method as the maintenance schedule is updated when new information on the degradation and remaining useful life of components becomes available. The performance, regarding the objective of minimal long-term mean cost per unit time, of the developed dynamic predictive maintenance policy is compared to five other conventional maintenance policies, these are: block-based maintenance, age-based maintenance, age-based maintenance with grouping, inspection condition-based maintenance and continuous condition-based maintenance. The ability of the predictive maintenance policy to react to changing component deterioration and dependencies within a multi-component system is quantified and the results show significant cost savings

  20. Remote maintenance of Compact Ignition Tokamak ex-vessel systems

    International Nuclear Information System (INIS)

    DePew, R.E.; Macdonald, D.

    1989-01-01

    The use of deuterium-tritium (D-T) fuel in the Compact Ignition Tokamak (CIT) will require applying remote handling technology for ex-vessel maintenance and replacement of machine components. Highly activated and contaminated components of the fusion device's auxiliary systems, such as diagnostics and RF heating, must be replaced using remotely operated maintenance equipment in the test cell. Throughout the CIT remote maintenance (RM) studies conducted to date, computer modeling has been used extensively to investigate manipulator access in these complex, tightly packed, and cluttered surroundings. A recent refinement of computer modeling involves the use of an intelligent engineering work station for realtime interactive display of task simulations. This paper discusses the use of three-dimensional (3-D) kinematic computer models of the CIT machines that are proving to be powerful tools in our efforts to evaluate RM requirements. This presentation includes a video-taped simulation of remote replacement of a plasma viewing assembly. The simulation illustrates some of the constraints associated with typical RM activities and the ways in which computer modeling enhances the design process. 1 ref., 3 figs

  1. Optimal Maintenance of a Production System with Intermediate Buffers

    Directory of Open Access Journals (Sweden)

    Constantinos C. Karamatsoukis

    2012-01-01

    Full Text Available We consider a production-inventory system that consists of an input-generating installation, a production unit and L intermediate buffers. It is assumed that the installation transfers the raw material to buffer and the production unit pulls the raw material from buffer We consider the problem of the optimal preventive maintenance of the installation if the installation deteriorates stochastically with usage and the production unit is always in operative condition. We also consider the problem of the optimal preventive maintenance of the production unit if the production unit deteriorates stochastically with usage and the installation is always in operative condition. Under a suitable cost structure and for given contents of the buffers, it is proved that the average-cost optimal policy for the first (second problem initiates a preventive maintenance of the installation (production unit if and only if the degree of deterioration of the installation (production unit exceeds some critical level. Numerical results are presented for both problems.

  2. Expert system for operational personnel support during power unit operation control in regulation range

    International Nuclear Information System (INIS)

    Yanitskij, V.A.

    1992-01-01

    The problems met when developing the systems for NPP operator support in the process of power unit operation are considered. The expert system for NPP personnel intelligent support combining the properties belonging to the artificial intelligence systems including selection of the analysis method taking into account the concrete technological situation and capability of application of algothmic calculations of the equipment characteristics using the information accumulated during the system development, erection and operation is described

  3. The tracking and locating system of the mining personnel based on the Zigbee wireless network platform

    Energy Technology Data Exchange (ETDEWEB)

    Xiao-jia, Xie; Li-jun, Cheng; Yong, Wang [Chongqing University, Chongqing (China). College of Resources and Environmental Science

    2007-08-15

    By comparing the advanced Zigbee wireless network system with active RFID, the Zigbee wireless network technology was introduced into the system for tracking and locating of coal miners. The system structure and function characteristics were also introduced. This system makes it convenient to mine administrators, control room personnel and security inspectors to obtain information on the working hours and location of mine workers in the mine. 6 refs., 2 figs., 3 tabs.

  4. Study of nuclear computer code maintenance and management system

    International Nuclear Information System (INIS)

    Ryu, Chang Mo; Kim, Yeon Seung; Eom, Heung Seop; Lee, Jong Bok; Kim, Ho Joon; Choi, Young Gil; Kim, Ko Ryeo

    1989-01-01

    Software maintenance is one of the most important problems since late 1970's.We wish to develop a nuclear computer code system to maintenance and manage KAERI's nuclear software. As a part of this system, we have developed three code management programs for use on CYBER and PC systems. They are used in systematic management of computer code in KAERI. The first program is embodied on the CYBER system to rapidly provide information on nuclear codes to the users. The second and the third programs were embodied on the PC system for the code manager and for the management of data in korean language, respectively. In the requirement analysis, we defined each code, magnetic tape, manual and abstract information data. In the conceptual design, we designed retrieval, update, and output functions. In the implementation design, we described the technical considerations of database programs, utilities, and directions for the use of databases. As a result of this research, we compiled the status of nuclear computer codes which belonged KAERI until September, 1988. Thus, by using these three database programs, we could provide the nuclear computer code information to the users more rapidly. (Author)

  5. THE SOCIAL INNOVATIONS HARMONISED WITH THE COMPANY PERSONNEL MANAGEMENT SYSTEM

    OpenAIRE

    Izabela Olton

    2014-01-01

    The issue of work-life balance (WLB) refers to the inability to reconcile duties at work with family obligations as both environments put evident pressure on a person. This leads to imbalance which is a source of personal stress and low productivity. Hence, one cannot hide the fact that the effects of this imbalance can be very burdensome in financial and strictly organizational terms and for workers themselves. The aim of this paper is to propose a systemic solution in the organization so th...

  6. Research and Development of a Network-Based Intelligent Maintenance Information System

    Institute of Scientific and Technical Information of China (English)

    ZANG Tie-gang; YANG Ming-zhong; GUO Shun-sheng

    2003-01-01

    A maintenance information system is an important part of equipment management. An intelli gent maintenance information system ( IMIS) is a synthesis of network technology, information technology and intelligent technology. The IMIS is used to finish flexible maintenance decision-making and fast maintenance planning, which helps enterprises to effectively reduce maintenance cost and increase working efficiency. Because the IMIS integrates advanced technologies, its performance is better than a traditional one.The difference between an IMIS and a traditional maintenance information system, and the functions, structure, important realizations, and application of an IMIS are discussed in this paper.

  7. Advanced Ground Systems Maintenance Physics Models For Diagnostics Project

    Science.gov (United States)

    Perotti, Jose M.

    2015-01-01

    The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations. This project will develop and implement high-fidelity physics-based modeling techniques tosimulate the real-time operation of cryogenics and other fluids systems and, when compared to thereal-time operation of the actual systems, provide assessment of their state. Physics-modelcalculated measurements (called “pseudo-sensors”) will be compared to the system real-timedata. Comparison results will be utilized to provide systems operators with enhanced monitoring ofsystems' health and status, identify off-nominal trends and diagnose system/component failures.This capability can also be used to conduct planning and analysis of cryogenics and other fluidsystems designs. This capability will be interfaced with the ground operations command andcontrol system as a part of the Advanced Ground Systems Maintenance (AGSM) project to helpassure system availability and mission success. The initial capability will be developed for theLiquid Oxygen (LO2) ground loading systems.

  8. System of preparing the personnel for railway of Uzbekistan

    Directory of Open Access Journals (Sweden)

    Abdullaaziz ARTIKBAEV

    2013-01-01

    Full Text Available The paper, by the example of training for the railway industry in Uzbekistan, focuses on the experiences and characteristics of Uzbekistan's integration into the international system of education, a framework of qualifications of the European Commission. Tashkent Institute of Railway Engineering has: rated the students' knowledge of the possibility of mutual recognition and accreditation based on the comparability of disciplines and curricula; included in its institutional strategy doctoral program, which has national features aimed at providing career opportunities for young researchers and university teachers based on the fundamental nature and the humanization of education, providing the preparation of the highly qualified specialists, ensures the interconnection and interdependence at all levels of technical education: secondary, undergraduate, graduate, doctoral and post-graduate training and re-training to maintain the knowledge and skills of teachers at the level of requests engineering and production of the XXI century.

  9. Quality assurance of the manual OSLD Badge based personnel monitoring system

    International Nuclear Information System (INIS)

    Kumar, Munish; Gaonkar, U.P.; Koul, D.K.; Datta, D.; Singh, S.K.; Rakesh, R.B.; Kulkarni, M.S.; Ratna, P.

    2018-01-01

    Optically stimulated luminescence (OSL) based technique is widely used for monitoring of radiation workers exposed to x, gamma and beta radiations. Features such as multiple readout, short processing time, better beta response, absence of infra red signal (no heating), flexibility in the dosimeter design using binders or substrates having low melting point are associated advantages. Presently α-Al 2 O 3 :C and BeO based dosimeters are popularly used for personnel monitoring applications worldwide. The present paper describe results of the external quality control check (QAC) tests performed for the present OSLD badge based personnel monitoring system. The results were analyzed as per ANSI criteria and Trumpet curve methods

  10. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    Science.gov (United States)

    Milana; Khan, M. K.; Munive, J. E.

    2014-07-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective.

  11. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    International Nuclear Information System (INIS)

    Milana; Khan, M K; Munive, J E

    2014-01-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective

  12. Towards an operational sensor-fusion system for anti-personnel landmine detection

    NARCIS (Netherlands)

    Cremer, F.; Schutte, K.; Schavemaker, J.G.M.; Breejen, E. den

    2000-01-01

    To acquire detection performance required for an operational system for the detection of anti-personnel landmines, it is necessary to use multiple sensors and sensor-fusion techniques. This paper describes five decision-level sensor-fusion techniques and their common optimisation method. The

  13. Child Maltreatment Reporting by Educational Personnel: Implications for Racial Disproportionality in the Child Welfare System

    Science.gov (United States)

    Krase, Kathryn Suzanne

    2015-01-01

    African American children are disproportionally overrepresented in the U.S. child protection system. Because educational personnel are a significant source of reports of suspected child maltreatment across the country and in all states, the present study examines the impact of these reports on racial disproportionality and disparity at the…

  14. 77 FR 36485 - Alternative Personnel Management System (APMS) at the National Institute of Standards and Technology

    Science.gov (United States)

    2012-06-19

    ... also identify waiver language needed to retain the original system feature of an extended probationary... comments to Amy K. Cubert, Supervisory Human Resources Specialist, National Institute of Standards and... period, a feature of the original demonstration project and subsequent Alternative Personnel Management...

  15. 77 FR 48128 - Alternative Personnel Management System (APMS) at the National Institute of Standards and Technology

    Science.gov (United States)

    2012-08-13

    ..., steps, and paperwork in classification, hiring, and other personnel systems, and through automation... with the authority to appoint candidates directly to jobs for which OPM determines that there is a...(a)(3). NIST advertises the availability of job opportunities in direct-hire occupations by posting...

  16. Practical Maintenance of Digital Systems: Guidance to Maximize the Benefits of Digital Technology for the Maintenance of Digital Systems and Plant Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Hill, D; Scarola, K

    2004-10-30

    This report presents detailed guidance for the maintenance and testing of modern digital systems. The guidance provides practical means for plants to take advantage of the increased diagnostic and self-test capabilities of these systems. It helps plants avoid mistakes in design and installation that could lead to increased maintenance burden and decreased system reliability and availability.

  17. Practical Maintenance of Digital Systems. Guidance to Maximize the Benefits of Digital Technology for the Maintenance of Digital Systems and Plant Equipment

    International Nuclear Information System (INIS)

    Hill, D.; Scarola, K.

    2004-01-01

    This report presents detailed guidance for the maintenance and testing of modern digital systems. The guidance provides practical means for plants to take advantage of the increased diagnostic and self-test capabilities of these systems. It helps plants avoid mistakes in design and installation that could lead to increased maintenance burden and decreased system reliability and availability

  18. Standard Hydrogen Monitoring System-D operation and maintenance manual

    International Nuclear Information System (INIS)

    Schneider, T.C.

    1997-01-01

    The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System-D (SHMS-D) used in the 200E and 200W area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course No. 351405, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted

  19. Standard hydrogen monitoring system - E operation and maintenance manual

    International Nuclear Information System (INIS)

    Schneider, T.C.

    1997-01-01

    The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System- E (SHMS-E) used in the 200E and 20OW area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course for SHMS, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted

  20. Effects of an Automated Maintenance Management System on organizational communication

    International Nuclear Information System (INIS)

    Bauman, M.B.; VanCott, H.P.

    1988-01-01

    The primary purpose of the project was to evaluate the effectiveness of two techniques for improving organizational communication: (1) an Automated Maintenance Management System (AMMS) and (2) Interdepartmental Coordination Meetings. Additional objectives concerned the preparation of functional requirements for an AMMS, and training modules to improve group communication skills. Four nuclear power plants participated in the evaluation. Two plants installed AMMSs, one plant instituted interdepartmental job coordination meetings, and the fourth plant served as a control for the evaluation. Questionnaires and interviews were used to collect evaluative data. The evaluation focused on five communication or information criteria: timeliness, redundancy, withholding or gatekeeping, feedback, and accuracy/amount

  1. IMPROVING THE SYSTEM OF REMUNERATION OF PERSONNEL OF THE ENTERPRISE ON THE BASIS OF KPI

    OpenAIRE

    V. V. Ivanov; Ya. N. Dzhankova; A. N. Legkonogich

    2017-01-01

    The advantages of the system of awarding of staff on key performance indicators are considered. The structure of formation of motivation on the basis of KPI. The main tasks when building a bonus system on the basis of KPI. Justification the use of key performance indicators in the enterprise is made. The scheme of construction of system of motivation of personnel KPI is proposed. 

  2. IMPROVING THE SYSTEM OF REMUNERATION OF PERSONNEL OF THE ENTERPRISE ON THE BASIS OF KPI

    Directory of Open Access Journals (Sweden)

    V. V. Ivanov

    2017-01-01

    Full Text Available The advantages of the system of awarding of staff on key performance indicators are considered. The structure of formation of motivation on the basis of KPI. The main tasks when building a bonus system on the basis of KPI. Justification the use of key performance indicators in the enterprise is made. The scheme of construction of system of motivation of personnel KPI is proposed. 

  3. Ten years experience with a large computerized TLD-personnel monitoring system

    International Nuclear Information System (INIS)

    Duftschmid, K.E.

    1986-01-01

    It is now ten years since our Institute for Radiation Protection has fully replaced its filmdosimetry service by a computerized automated TLD system. Presently more than 13000 radiation workers are monthly monitored by three automated TLD readers linked to the computer center. The paper describes system hardware and software and experience gained in long-term routine operation. In particular the introduction of the new ICRU quantities for personnel dosimetry in the existing TLD system is discussed. (Author)

  4. Accounting of features of motivation of personnel of a project organizational structure in system of personnel safety

    Directory of Open Access Journals (Sweden)

    T. I. Ovchinnikova

    2017-01-01

    Full Text Available The article deals with the concept of motivation of effective activity of the staff, under which the authors have in the form of activity of employees, aimed at achieving personal and organizational needs. The authors distinguish between the concepts of stimulus and motive, while under the first definition they mean the achievement of here and now goals. Different approaches to the theory of motivation are considered, which testify to the need to take them into account in production activities and in the system of personnel security, as well as different levels of employee motivation classification, such as nuclear – an especially important and immediate need of the employee, compensating – an important but not a priority for the employee, organizational. Combining the first two, the background one is important for the organization, but remote in time for the employee. The model of distribution of employees, participants of the project organization depending on the performance of activities on the stages, taking into account the three criteria  – material incentive (nuclear demand, competency of the performer (compensating need, time motivation (background requirement is offered. The analysis is justified by the influence of motives of a different-level order, reflected in the growth of labor productivity, the reduction of administrative and managerial expenses, increased involvement of workers in activities related to improving working conditions, the accessibility of managers to a broader base of talented professionals, the ability to employ people living in remote places . It is pointed out that a long-term motivation can meet not only the immediate needs of the employee, but also be a background requirement, when, without having the opportunity to increase the salary to the employee, the head can motivate the employee with a convenient working regime. Studies on the need to take account of background needs. A matrix of integral

  5. Optimal maintenance policy incorporating system level and unit level for mechanical systems

    Science.gov (United States)

    Duan, Chaoqun; Deng, Chao; Wang, Bingran

    2018-04-01

    The study works on a multi-level maintenance policy combining system level and unit level under soft and hard failure modes. The system experiences system-level preventive maintenance (SLPM) when the conditional reliability of entire system exceeds SLPM threshold, and also undergoes a two-level maintenance for each single unit, which is initiated when a single unit exceeds its preventive maintenance (PM) threshold, and the other is performed simultaneously the moment when any unit is going for maintenance. The units experience both periodic inspections and aperiodic inspections provided by failures of hard-type units. To model the practical situations, two types of economic dependence have been taken into account, which are set-up cost dependence and maintenance expertise dependence due to the same technology and tool/equipment can be utilised. The optimisation problem is formulated and solved in a semi-Markov decision process framework. The objective is to find the optimal system-level threshold and unit-level thresholds by minimising the long-run expected average cost per unit time. A formula for the mean residual life is derived for the proposed multi-level maintenance policy. The method is illustrated by a real case study of feed subsystem from a boring machine, and a comparison with other policies demonstrates the effectiveness of our approach.

  6. Feasibility study for a transportation operations system cask maintenance facility

    Energy Technology Data Exchange (ETDEWEB)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  7. Advanced monitoring, fault diagnostics, and maintenance of cryogenic systems

    CERN Document Server

    Girone, Mario; Pezzetti, Marco

    In this Thesis, advanced methods and techniques of monitoring, fault diagnostics, and predictive maintenance for cryogenic processes and systems are described. In particular, in Chapter 1, mainstreams in research on measurement systems for cryogenic processes are reviewed with the aim of dening key current trends and possible future evolutions. Then, in Chapter 2, several innovative methods are proposed. A transducer based on a virtual ow meter is presented for monitoring helium distribution and consumption in cryogenic systems for particle accelerators [1]. Furthermore, a comprehensive metrological analysis of the proposed transducer for verifying the metrological performance and pointing out most critical uncertainty sources is described [2]. A model-based method for fault detection and early-stage isolation, able to work with few records of Frequency Response Function (FRF) on an unfaulty compressor, is then proposed [3]. To enrich the proposal, a distributed diagnostic procedure, based on a micro-genetic...

  8. Feasibility study for a transportation operations system cask maintenance facility

    International Nuclear Information System (INIS)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs

  9. Remote systems and remote maintenance of a reprocessing plant in Japan

    International Nuclear Information System (INIS)

    Funaya, T.

    1977-01-01

    The design concept and overall maintenance philosophy applied in the Power Reactor and Nuclear Fuel Development Corporation Reprocessing Plant at Tokai-mura, Japan, are briefly introduced. Details on remote systems and remote maintenance in mechanical processing areas are described

  10. Multipurpose expert-robot system model for control, diagnosis, maintenance, and repairs at the steam generators of the NPP

    International Nuclear Information System (INIS)

    Popa, I.

    1994-01-01

    The paper presents the model concept for a multipurpose expert-robot system for control, diagnosis, forecast, maintenance, and repairs at the steam generators of CANDU type nuclear power plants. The system has two separate parts: the expert system and the robot (manipulator) system. These parts compose a hierarchic structure with the expert system on the upper level. The expert system has a blackboard architecture, to which tree interfaces with the robot system, with the control system of the NPP and with the methods and techniques of control, maintenance and repairs system of the steam generator are added. Due to complex nature of its activities the expert-robot system model combines the deterministic type reasons with probabilistic, fuzzy, and neural-networks type ones. The information that enter the expert system comes from the robot system, from process, from user, and human expert. The information that enter robot system comes from the expert system, from the human operator (when connected) and from process. Control maintenance and repair operations take place by means of the robot system that can be monitored either directly by the expert system or by the human operator who follows its activity. All these activities are performed in parallel with the adequate information of the expert system directly, by the human operator, about the status parameters and, possibly, operating parameters of the steam generator components. The expert-robot system can work independently, but it can be connected and integrated in the control system of NPP, to take over and develop some of its functions. The activities concerning diagnosis and characterization of the state of steam generator components subsequent to control, as well as the forecast of their future behavior, are performed by means of the expert system. Due to these characteristics the expert-robot system can be used successfully in personnel training activities. (Author)

  11. TITLE III EVALUATION REPORT FOR THE MATERIAL AND PERSONNEL HANDLING SYSTEM

    International Nuclear Information System (INIS)

    T. A. Misiak

    1998-01-01

    This Title III Evaluation Report (TER) provides the results of an evaluation that was conducted on the Material and Personnel Handling System. This TER has been written in accordance with the ''Technical Document Preparation Plan for the Mined Geologic Disposal System Title III Evaluation Reports'' (BA0000000-01717-4600-00005 REV 03). The objective of this evaluation is to provide recommendations to ensure consistency between the technical baseline requirements, baseline design, and the as-constructed Material and Personnel Handling System. Recommendations for resolving discrepancies between the as-constructed system, the technical baseline requirements, and the baseline design are included in this report. Cost and Schedule estimates are provided for all recommended modifications

  12. Optimization of reliability centered predictive maintenance scheme for inertial navigation system

    International Nuclear Information System (INIS)

    Jiang, Xiuhong; Duan, Fuhai; Tian, Heng; Wei, Xuedong

    2015-01-01

    The goal of this study is to propose a reliability centered predictive maintenance scheme for a complex structure Inertial Navigation System (INS) with several redundant components. GO Methodology is applied to build the INS reliability analysis model—GO chart. Components Remaining Useful Life (RUL) and system reliability are updated dynamically based on the combination of components lifetime distribution function, stress samples, and the system GO chart. Considering the redundant design in INS, maintenance time is based not only on components RUL, but also (and mainly) on the timing of when system reliability fails to meet the set threshold. The definition of components maintenance priority balances three factors: components importance to system, risk degree, and detection difficulty. Maintenance Priority Number (MPN) is introduced, which may provide quantitative maintenance priority results for all components. A maintenance unit time cost model is built based on components MPN, components RUL predictive model and maintenance intervals for the optimization of maintenance scope. The proposed scheme can be applied to serve as the reference for INS maintenance. Finally, three numerical examples prove the proposed predictive maintenance scheme is feasible and effective. - Highlights: • A dynamic PdM with a rolling horizon is proposed for INS with redundant components. • GO Methodology is applied to build the system reliability analysis model. • A concept of MPN is proposed to quantify the maintenance sequence of components. • An optimization model is built to select the optimal group of maintenance components. • The optimization goal is minimizing the cost of maintaining system reliability

  13. Winter maintenance performance measure.

    Science.gov (United States)

    2016-01-01

    The Winter Performance Index is a method of quantifying winter storm events and the DOTs response to them. : It is a valuable tool for evaluating the States maintenance practices, performing post-storm analysis, training : maintenance personnel...

  14. A prototype of a documentation system that supports the development and maintenance of product configuration systems

    DEFF Research Database (Denmark)

    Haug, Anders; Degn, Anders; Poulsen, Bjarne

    2007-01-01

    , such as shorter lead times, reductions of resources needed and fewer errors. A procedure for the development and maintenance of PCSs, which has been applied in configuration projects for more than ten years, includes three main modelling techniques to support the development and maintenance of PCSs. Unfortunately...... system that supports the development and maintenance of PCSs. This article describes how some of this research has been converted into a prototype of a documentation system and what has been learned from the evaluation of the prototype...

  15. Evaluation of mental workload on digital maintenance systems in nuclear power plants

    International Nuclear Information System (INIS)

    Hwang, S. L.; Huang, F. H.; Lin, J. C.; Liang, G. F.; Yenn, T. C.; Hsu, C. C.

    2006-01-01

    The purpose of this study is to evaluate operators' mental workload dealing with digital maintenance systems in Nuclear Power Plants. First of all, according to the factors affected the mental workload, a questionnaire was designed to evaluate the mental workload of maintenance operators at the second Nuclear Power (NPP) in Taiwan. Then, sixteen maintenance engineers of the Second NPP participated in the questionnaire survey. The results indicated that the mental workload was lower in digital systems than that in analog systems. Finally, a mental workload model based on Neural Network technique was developed to predict the workload of maintenance operators in digital maintenance systems. (authors)

  16. Design an optimum safety policy for personnel safety management - A system dynamic approach

    International Nuclear Information System (INIS)

    Balaji, P.

    2014-01-01

    Personnel safety management (PSM) ensures that employee's work conditions are healthy and safe by various proactive and reactive approaches. Nowadays it is a complex phenomenon because of increasing dynamic nature of organisations which results in an increase of accidents. An important part of accident prevention is to understand the existing system properly and make safety strategies for that system. System dynamics modelling appears to be an appropriate methodology to explore and make strategy for PSM. Many system dynamics models of industrial systems have been built entirely for specific host firms. This thesis illustrates an alternative approach. The generic system dynamics model of Personnel safety management was developed and tested in a host firm. The model was undergone various structural, behavioural and policy tests. The utility and effectiveness of model was further explored through modelling a safety scenario. In order to create effective safety policy under resource constraint, DOE (Design of experiment) was used. DOE uses classic designs, namely, fractional factorials and central composite designs. It used to make second order regression equation which serve as an objective function. That function was optimized under budget constraint and optimum value used for safety policy which shown greatest improvement in overall PSM. The outcome of this research indicates that personnel safety management model has the capability for acting as instruction tool to improve understanding of safety management and also as an aid to policy making

  17. Design an optimum safety policy for personnel safety management - A system dynamic approach

    Energy Technology Data Exchange (ETDEWEB)

    Balaji, P. [The Glocal University, Mirzapur Pole, Delhi- Yamuntori Highway, Saharanpur 2470001 (India)

    2014-10-06

    Personnel safety management (PSM) ensures that employee's work conditions are healthy and safe by various proactive and reactive approaches. Nowadays it is a complex phenomenon because of increasing dynamic nature of organisations which results in an increase of accidents. An important part of accident prevention is to understand the existing system properly and make safety strategies for that system. System dynamics modelling appears to be an appropriate methodology to explore and make strategy for PSM. Many system dynamics models of industrial systems have been built entirely for specific host firms. This thesis illustrates an alternative approach. The generic system dynamics model of Personnel safety management was developed and tested in a host firm. The model was undergone various structural, behavioural and policy tests. The utility and effectiveness of model was further explored through modelling a safety scenario. In order to create effective safety policy under resource constraint, DOE (Design of experiment) was used. DOE uses classic designs, namely, fractional factorials and central composite designs. It used to make second order regression equation which serve as an objective function. That function was optimized under budget constraint and optimum value used for safety policy which shown greatest improvement in overall PSM. The outcome of this research indicates that personnel safety management model has the capability for acting as instruction tool to improve understanding of safety management and also as an aid to policy making.

  18. Design an optimum safety policy for personnel safety management - A system dynamic approach

    Science.gov (United States)

    Balaji, P.

    2014-10-01

    Personnel safety management (PSM) ensures that employee's work conditions are healthy and safe by various proactive and reactive approaches. Nowadays it is a complex phenomenon because of increasing dynamic nature of organisations which results in an increase of accidents. An important part of accident prevention is to understand the existing system properly and make safety strategies for that system. System dynamics modelling appears to be an appropriate methodology to explore and make strategy for PSM. Many system dynamics models of industrial systems have been built entirely for specific host firms. This thesis illustrates an alternative approach. The generic system dynamics model of Personnel safety management was developed and tested in a host firm. The model was undergone various structural, behavioural and policy tests. The utility and effectiveness of model was further explored through modelling a safety scenario. In order to create effective safety policy under resource constraint, DOE (Design of experiment) was used. DOE uses classic designs, namely, fractional factorials and central composite designs. It used to make second order regression equation which serve as an objective function. That function was optimized under budget constraint and optimum value used for safety policy which shown greatest improvement in overall PSM. The outcome of this research indicates that personnel safety management model has the capability for acting as instruction tool to improve understanding of safety management and also as an aid to policy making.

  19. Operation and maintenance of the T-3 cask system

    International Nuclear Information System (INIS)

    Hussey, M.W.; Berger, J.D.; Peterson, J.M.

    1983-01-01

    The T-3 cask system consists of three lead-shielded casks and the associated payload containers, internal fixturing, tiedowns, transportation trailers and handling devices. The three casks were designed to meet the requirements of Title 10 of the Code of Federal Regulations, Part 71. The Nuclear Regulatory Commission cask licensing activities for original design and for licensing revisions have required significant analytical support. Commercial transportation contractors can provide needed services including provisions of suitable equipment, compliances with security requirements, and safe movement of the shipment at a potential savings over DOE-owned transportation systems. Proper periodic inspection/maintenance activities supported by adequate decontamination facilities are a must in keeping the T-3 casks available for service

  20. PAMTRAK: A system to monitor high value objects and personnel in restricted areas

    International Nuclear Information System (INIS)

    Anspach, D.A.; Walters, B.G.; Anspach, J.P.; Crain, B. Jr.

    1996-01-01

    The US Department of Energy (DOE) uses sensitive or classified parts and material that must be protected and accounted for. The authors believe there is a need for an automated system that can help protect and monitor these parts and material. In response to this need Sandia National Laboratories (SNL) has developed a real-time personnel and material tracking system called PAMTRAK that has been installed at selected DOE facilities. PAMTRAK safeguards sensitive parts and material by tracking tags worn by personnel and by monitoring sensors attached to the parts or material. This paper describes the goals when designing PAMTRAK, the PAMTRAK system components, the current installations, and the benefits a site can expect when using PAMTRAK

  1. Design lessons from using programmable controllers in the MFTF-B personnel safety and interlocks system

    International Nuclear Information System (INIS)

    Branum, J.D.

    1983-01-01

    Applying programmable controllers in critical applications such as personnel safety and interlocks systems requires special considerations in the design of both hardware and software. All modern programmable controller systems feature extensive internal diagnostic capabilities to protect against problems such as program memory errors; however most, if not all present designs lack an intrinsic capability for detecting and countering failures on the field-side of their I/O modules. Many of the most common styles of I/O modules can also introduce potentially dangerous sneak circuits, even without component failure. This paper presents the most significant lessons learned to date in the design of the MFTF-B Personnel Safety and Interlocks System, which utilizes two non-redundant programmable controllers with over 800 I/O points each. Specific problems recognized during the design process as well as those discovered during initial testing and operation are discussed along with their specific solutions in hardware and software

  2. Far-infrared contraband-detection-system development for personnel-search applications

    International Nuclear Information System (INIS)

    Schellenbaum, R.L.

    1982-09-01

    Experiments have been conducted toward the development of an active near-millimeter-wave, far infrared, personnel search system for the detection of contraband. These experiments employed a microwave hybrid tee interferometer/radiometer scanning system and quasi-optical techniques at 3.3-mm wavelength to illuminate and detect the reflection from target objects against a human body background. Clothing and other common concealing materials are transport at this wavelength. Retroreflector arrays, in conjunction with a Gunn diode radiation source, were investigated to provide all-angle illumination and detection of specular reflections from unaligned and irregular-shaped objects. Results indicate that, under highly controlled search conditions, metal objects greater than or equal to 25 cm 2 can be detected in an enclosure lined with retroreflectors. Further development is required to produce a practical personnel search system. The investigation and feasibility of alternate far infrared search techniques are presented. 23 figures, 2 tables

  3. Conceptual design of EAST multi-purpose maintenance deployer system

    Energy Technology Data Exchange (ETDEWEB)

    Pan, Hongtao [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China); University of Science and Technology of China, Hefei, Anhui 230022 (China); He, Kaihui, E-mail: hekh@iterchina.cn [China International Nuclear Fusion Energy Program Execution Center, Beijing 100862 (China); Cheng, Yong [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China); Song, Yuntao [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China); University of Science and Technology of China, Hefei, Anhui 230022 (China); Yang, Yang [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China); Villedieu, Eric [CEA-IRFM, F-13108 Saint-Paul-Lez-Durance (France); Shi, Shanshuang; Yang, Songzhu [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China)

    2017-05-15

    Highlights: • A redundant 11-DOF articulated robot for EAST in-vessel maintenance is presented. • A new modular joint developed to optimize the yaw joint actuator for the robot is described. • A 3-DOF gripper integrated with cameras and torque sensor is developed. - Abstract: EAST multi-purpose maintenance deployer (EMMD) system, being collaboratively developed by ASIPP and CEA-IRFM, is built as upgrades for EAMA. Updated kinematics parameters such as DOF distribution and joint angle for EMMD robot are performed and verified in a simulation platform. A new modular joint has been developed to optimize the yaw joint actuator for easy assembly and flexibility reduction. A 3-DOF gripper with cameras and torque sensor has been designed to provide inspection and dexterous handling of small fragments inside the EAST chamber. A conceptual upgrade for EAMA-CASK has been developed for the purpose of protecting the end-effector's sensors which do not have temperature-resistant qualification. The high temperature and vacuum compatible solutions and validation experiments have been presented in this paper.

  4. Conceptual design of EAST multi-purpose maintenance deployer system

    International Nuclear Information System (INIS)

    Pan, Hongtao; He, Kaihui; Cheng, Yong; Song, Yuntao; Yang, Yang; Villedieu, Eric; Shi, Shanshuang; Yang, Songzhu

    2017-01-01

    Highlights: • A redundant 11-DOF articulated robot for EAST in-vessel maintenance is presented. • A new modular joint developed to optimize the yaw joint actuator for the robot is described. • A 3-DOF gripper integrated with cameras and torque sensor is developed. - Abstract: EAST multi-purpose maintenance deployer (EMMD) system, being collaboratively developed by ASIPP and CEA-IRFM, is built as upgrades for EAMA. Updated kinematics parameters such as DOF distribution and joint angle for EMMD robot are performed and verified in a simulation platform. A new modular joint has been developed to optimize the yaw joint actuator for easy assembly and flexibility reduction. A 3-DOF gripper with cameras and torque sensor has been designed to provide inspection and dexterous handling of small fragments inside the EAST chamber. A conceptual upgrade for EAMA-CASK has been developed for the purpose of protecting the end-effector's sensors which do not have temperature-resistant qualification. The high temperature and vacuum compatible solutions and validation experiments have been presented in this paper.

  5. Reactor technology: power conversion systems and reactor operation and maintenance

    International Nuclear Information System (INIS)

    Powell, J.R.

    1977-01-01

    The use of advanced fuels permits the use of coolants (organic, high pressure helium) that result in power conversion systems with good thermal efficiency and relatively low cost. Water coolant would significantly reduce thermal efficiency, while lithium and salt coolants, which have been proposed for DT reactors, will have comparable power conversion efficiencies, but will probably be significantly more expensive. Helium cooled blankets with direct gas turbine power conversion cycles can also be used with DT reactors, but activation problems will be more severe, and the portion of blanket power in the metallic structure will probably not be available for the direct cycle, because of temperature limitations. A very important potential advantage of advanced fuel reactors over DT fusion reactors is the possibility of easier blanket maintenance and reduced down time for replacement. If unexpected leaks occur, in most cases the leaking circuit can be shut off and a redundant cooling curcuit will take over the thermal load. With the D-He 3 reactor, it appears practical to do this while the reactor is operating, as long as the leak is small enough not to shut down the reactor. Redundancy for Cat-D reactors has not been explored in detail, but appears feasible in principle. The idea of mobile units operating in the reactor chamber for service and maintenance of radioactive elements is explored

  6. Maintenance of systemic immune functions prevents accelerated presbycusis.

    Science.gov (United States)

    Iwai, Hiroshi; Baba, Susumu; Omae, Mariko; Lee, Shinryu; Yamashita, Toshio; Ikehara, Susumu

    2008-05-07

    There is no effective therapy for progressive hearing loss such as presbycusis, the causes of which remain poorly understood because of the difficulty of separating genetic and environmental contributions. In the present study, we show that the age-related dysfunctions of the systemic immune system in an animal model of accelerated presbycusis (SAMP1, senescence-accelerated mouse P1) can be corrected by allogeneic bone marrow transplantation (BMT). We also demonstrate that this presbycusis can be prevented; BMT protects the recipients from age-related hearing impairment and the degeneration of spiral ganglion cells (SGCs) as well as the dysfunctions of T lymphocytes, which have a close relation to immune senescence. No donor cells are infiltrated to the spiral ganglia, confirming that this experimental system using BMT is connected to the systemic immune system and does not contribute to transdifferentiation or fusion by donor hematopoietic stem cells (HSCs), or to the direct maintenance of ganglion cells by locally infiltrated donor immunocompetent cells. Therefore, another procedure which attempts to prevent the age-related dysfunctions of the recipient immune system is the inoculation of syngeneic splenocytes from young donors. These mice show no development of hearing loss, compared with the recipient mice with inoculation of saline or splenocytes from old donors. Our studies on the relationship between age-related systemic immune dysfunctions and neurodegeneration mechanisms open up new avenues of treatment for presbycusis, for which there is no effective therapy.

  7. Department of Energy standard for the performance testing of personnel dosimetry systems

    International Nuclear Information System (INIS)

    1986-12-01

    This standard is intended to be used in the Department of Energy Laboratory Accreditation Program (DOELAP) for personnel dosimetry systems. It is based on the American National Standards Institute's (ANSI) ''Criteria for Testing Personnel Dosimetry Performance,'' ANSI N13.11-1983, recommendations made to DOE in ''Guidelines for the Calibration of Personnel Dosimeters,'' Pacific Northwest Laboratory (PNL)-4515 and comments received during peer review by DOE and DOE contractor personnel. The recommendations contained in PNL-4515 were based on an evaluation of ANSI N13.11 conducted for the Office of Nuclear Safety, DOE, by PNL. Parts of ANSI N13.11 that did not require modification were used essentially intact in this standard to maintain consistency with nationally recognized standards. Modifications to this standard have resulted from several DOE/DOE contractor reviews and a pilot testing session. An initial peer review by selected DOE and DOE contractor representatives on technical content was conducted in 1983. A review by DOE field offices, program offices, and contractors was conducted in mid-1984. A pilot performance testing session sponsored by the Office of Nuclear Safety was conducted in early 1985 by the Radiological and Environmental Sciences Laboratory, Idaho Falls. Results of the pilot test were reviewed in late 1985 by a DOE and DOE contractor committee. 11 refs., 4 tabs

  8. Radiation analysis of the CIT [Compact Ignition Tokamak] pellet injector system and its impact on personnel access

    International Nuclear Information System (INIS)

    Selcow, E.C.; Stevens, P.N.; Gomes, I.C.; Gomes, L.M.

    1988-08-01

    The conceptual design of the Compact Ignition Tokamak (CIT) is nearing completion. The CIT is a short-pulse ignition experiment, which is planned to follow the operations of the Tokamak Fusion Test Reactor (TFTR) at the Princeton Plasma Physics Laboratory (PPPL). The high neutron wall loadings, 4--5 MW/m 2 , associated with the operation of this device require that neutronics-related issues be considered in the overall system design. Radiation shielding is required for the protection of device components as well as personnel. A close-in igloo shield has been designed around the periphery of the tokamak structure, and the entire experiment is housed in a circular test cell facility that has a radius of 12 m. The most critical radiation concerns in the CIT design process relate to the numerous penetrations in the device. This report discusses the impact of a major penetration on the design and operation of the pellet injection system in the CIT. The pellet injector is a major component, and it has a line-of-sight penetration through the igloo and test cell wall. All current options for maintenance of the injector require hands-on-access. A nuclear analysis has been performed to establish the feasibility of hands-on-access. A coupled Monte Carlo/discrete-ordinates methodology was used to perform the analysis. This problem is characterized by deep penetration and streaming with very large length-to-diameter ratios. Results from this study indicate that personnel access to the pellet injector glovebox is possible. 14 refs., 3 figs., 3 tabs

  9. Predictive maintenance policy for a gradually deteriorating system subject to stress

    Energy Technology Data Exchange (ETDEWEB)

    Deloux, E. [IRCCyN/Ecole des Mines de Nantes, Nantes (France); Castanier, B. [IRCCyN/Ecole des Mines de Nantes, Nantes (France)], E-mail: bruno.castanier@emn.fr; Berenguer, C. [Universite de Technologie de Troyes/CNRS, Troyes (France)

    2009-02-15

    This paper deals with a predictive maintenance policy for a continuously deteriorating system subject to stress. We consider a system with two failure mechanisms which are, respectively, due to an excessive deterioration level and a shock. To optimize the maintenance policy of the system, an approach combining statistical process control (SPC) and condition-based maintenance (CBM) is proposed. CBM policy is used to inspect and replace the system according to the observed deterioration level. SPC is used to monitor the stress covariate. In order to assess the performance of the proposed maintenance policy and to minimize the long-run expected maintenance cost per unit of time, a mathematical model for the maintained system cost is derived. Analysis based on numerical results are conducted to highlight the properties of the proposed maintenance policy in respect to the different maintenance parameters.

  10. Predictive maintenance policy for a gradually deteriorating system subject to stress

    International Nuclear Information System (INIS)

    Deloux, E.; Castanier, B.; Berenguer, C.

    2009-01-01

    This paper deals with a predictive maintenance policy for a continuously deteriorating system subject to stress. We consider a system with two failure mechanisms which are, respectively, due to an excessive deterioration level and a shock. To optimize the maintenance policy of the system, an approach combining statistical process control (SPC) and condition-based maintenance (CBM) is proposed. CBM policy is used to inspect and replace the system according to the observed deterioration level. SPC is used to monitor the stress covariate. In order to assess the performance of the proposed maintenance policy and to minimize the long-run expected maintenance cost per unit of time, a mathematical model for the maintained system cost is derived. Analysis based on numerical results are conducted to highlight the properties of the proposed maintenance policy in respect to the different maintenance parameters

  11. RTEMS Centre - Support and Maintenance Centre to RTEMS Operating System

    Science.gov (United States)

    Silva, H.; Constantino, A.; Freitas, D.; Coutinho, M.; Faustino, S.; Mota, M.; Colaço, P.; Sousa, J.; Dias, L.; Damjanovic, B.; Zulianello, M.; Rufino, J.

    2009-05-01

    RTEMS CENTRE - Support and Maintenance Centre to RTEMS Operating System is a joint ESA/Portuguese Task Force initiative to develop a support and maintenance centre to the Real-Time Executive for Multiprocessor Systems (RTEMS). This paper gives a high level visibility of the progress, the results obtained and the future work in the RTEMS CENTRE [6] and in the RTEMS Improvement [7] projects. RTEMS CENTRE started officially in November 2006, with the RTEMS 4.6.99.2 version. A full analysis of RTEMS operating system was produced. The architecture was analysed in terms of conceptual, organizational and operational concepts. The original objectives [1] of the centre were primarily to create and maintain technical expertise and competences in this RTOS, to develop a website to provide the European Space Community an entry point for obtaining support (http://rtemscentre.edisoft.pt), to design, develop, maintain and integrate some RTEMS support tools (Timeline Tool, Configuration and Management Tools), to maintain flight libraries and Board Support Packages, to develop a strong relationship with the World RTEMS Community and finally to produce some considerations in ARINC-653, DO-178B and ECSS E-40 standards. RTEMS Improvement is the continuation of the RTEMS CENTRE. Currently the RTEMS, version 4.8.0, is being facilitated for a future qualification. In this work, the validation material is being produced following the Galileo Software Standards Development Assurance Level B [5]. RTEMS is being completely tested, errors analysed, dead and deactivated code removed and tests produced to achieve 100% statement and decision coverage of source code [2]. The SW to exploit the LEON Memory Management Unit (MMU) hardware will be also added. A brief description of the expected implementations will be given.

  12. Augmented reality aided operation and maintenance system for indoor environments

    International Nuclear Information System (INIS)

    Tamura, Yuichi; Umetani, Tomohiro; Kubo, Shin

    2013-01-01

    This paper proposes an Augmented Reality (AR) system to assist operation and maintenance tasks in an indoor environment, such as a nuclear fusion reactor and its building. AR is a technology that enhances real information by adding 3D virtual objects, images, sounds, or movies via a web camera. The AR system often uses “markers” such as QR code to detect the place where the virtual content should appear. However, these markers are unnatural and they can disturb the scenery. We propose an AR system that can detect natural markers, which provides AR content via a network. This system stores the information related to markers and virtual objects on a server. A device connected to this system automatically downloads this content so that the user can watch the AR content via a web camera. We add a real-time numerical simulation function that allows us to simulate physical phenomena by touching AR contents. It also enables us to observe simulation results by downloading a movie of numerical simulation results from the simulation server. Overall, this system allows us to watch the same content with multiple devices and to simulate physical phenomena using various parameters. (author)

  13. Reliability centered maintenance pilot system implementation 241-AP-tank farm primary ventilation system final report

    International Nuclear Information System (INIS)

    MOORE TL

    2001-01-01

    When the Hanford Site Tank Farms' mission was safe storage of radioactive waste in underground storage tanks, maintenance activities focused on time-based preventive maintenance. Tank Farms' new mission to deliver waste to a vitrification plant where the waste will be processed into a form suitable for permanent storage requires a more efficient and proactive approach to maintenance. Systems must be maintained to ensure that they are operational and available to support waste feed delivery on schedule with a minimum of unplanned outages. This report describes the Reliability Centered Maintenance (RCM) pilot system that was implemented in the 241-AP Tank Farm Primary Ventilation System under PI-ORP-009 of the contract between the U.S. Department of Energy, Office of River Protection and CH2M HILL Hanford Group Inc. (CHG). The RCM analytical techniques focus on monitoring the condition of operating systems to predict equipment failures so that maintenance activities can be completed in time to prevent or mitigate unplanned equipment outages. This approach allows maintenance activities to be managed with minimal impact on plant operations. The pilot demonstration provided an opportunity for CHG staff-training in RCM principles and tailoring of the RCM approach to the Hanford Tank Farms' unique needs. This report details the implementation of RCM on a pilot system in Tank Farms

  14. Main maintenance operations for Test Blanket Systems in ITER TBM port cells

    Energy Technology Data Exchange (ETDEWEB)

    Pascal, R., E-mail: romain.pascal@iter.org [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Cortes, P.; Friconneau, J.-P.; Giancarli, L.M.; Gotewal, K.K.; Iseli, M.; Kim, B.Y.; Levesy, B.; Martins, J.-P.; Merola, M. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Nevière, J.-C. [Comex-Nucleaire, 13115 Saint Paul Lez Durance (France); Patisson, L. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Siarras, A. [Sogetti, Parc de la Duranne, 13857 Aix-en-Provence (France); Tesini, A. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2013-10-15

    Highlights: • The Test Blanket System components layout in Port Cell room is described. • The maintenance of the two Test Blanket Systems in ITER port cell is addressed. • The overall replacement/maintenance strategy is defined. • The main maintenance tasks of the systems are discussed. • The maintenance strategy and required tools are presented. -- Abstract: Each Test Blanket System in ITER is formed by an in-vessel component, the Test Blanket Module, and several associated ancillary systems (coolant and Tritium systems, instrumentation and control systems). The paper describes the overall replacement/maintenance strategy and the main maintenance tasks that have to be considered in the design of the systems. It shows that there are no critical issues.

  15. Maintenance quality surveillance for nuclear reactor instrument and control systems

    International Nuclear Information System (INIS)

    Clement, T.M.

    1976-01-01

    A description is given of a formal program of mandatory testing and inspection for assurance of reliability at the N-reactor. The techniques and procedures are called Equipment Maintenance Standards (EMS) and cover the nuclear plant systems which affect nuclear safety, environmental control, continuity of operation and reactor life. The scope of the program is such that all electrical, chemical, mechanical, and nuclear devices with interconnecting circuitry, linkages, and piping are functionally checked and/or inspected from sensors through actuating media necessary for carrying out the defined functions under startup, operating, and shutdown conditions and also under any credible accident condition. Records are kept of the AS FOUND results of the tests and inspections along with adjustments and repairs required to correct any out-of-limits conditions found. These records are accumulated and are used as a source for quantitative reliability information and for evaluating wear-out or design problems

  16. Cryogenic systems advanced monitoring, fault diagnostics, and predictive maintenance

    CERN Document Server

    Arpaia, Pasquale; Inglese, Vitaliano; Pezzetti, Marco

    2018-01-01

    Cryogenics, the study and technology of materials and systems at very low temperature, is widely used for sensors and instruments requiring very highly precise measurements with low electrical resistance, especially for measurements of materials and energies at a very small scale. Thus, the need to understand how instruments operate and perform over time at temperatures below -2920 F (-1800 C) is critical, for applications from Magnetic Resonance Imaging (MRI) to Nuclear Magnetic Resonance Spectroscopy to instrumentation for particle accelerators of all kinds. This book brings to the reader guidance learned from work at the European Laboratory for Nuclear Research (CERN), and its large scale particle accelerator in Switzerland to help engineers and technicians implement best practices in instrumentation at cryogenic temperatures, including a better understanding of fault detection and predictive maintenance. Special problems with devices like flow meters, pressure gauges, and temperature gauges when operating...

  17. RF radiation measurement for the Advanced Photon Source (AS) personnel safety system

    International Nuclear Information System (INIS)

    Song, J.J.; Kim, J.; Otocki, R.; Zhou, J.

    1995-01-01

    The Advanced Photon Source (APS) booster and storage ring RF system consists of five 1-MW klystrons, four 5-cell cavities, and sixteen single-cell cavities. The RF power is distributed through many hundreds of feet of WR2300 waveguide with H-hybrids and circulators. In order to protect personnel from the danger of RF radiation due to loose flanges or other openings in the waveguide system, three detector systems were implemented: an RF radiation detector, a waveguide pressure switch, and a Radiax aperture detector (RAD). This paper describes RF radiation measurements on the WR 2300 waveguide system

  18. Application of wireless sensor networks in personnel dosage monitoring system of nuclear power plant

    International Nuclear Information System (INIS)

    Chen Yonghong; Zhang Dafa; Jiang Wei; Chen Dengke

    2007-01-01

    Aim to meet the need of personnel dosage monitoring of nuclear power plant, a monitoring system was designed which based on wireless sensor network. First, the basic concept was described; the characteristics of the wireless sensor network applied in the monitoring system of nuclear power plant were also been analyzed; the structure of the system was built too. Finally, the special technologies like the choice of communication mode, the security of communication network and orientation that used in the monitoring system were discussed. (authors)

  19. Personnel reliability impact on petrochemical facilities monitoring system's failure skipping probability

    Science.gov (United States)

    Kostyukov, V. N.; Naumenko, A. P.

    2017-08-01

    The paper dwells upon urgent issues of evaluating impact of actions conducted by complex technological systems operators on their safe operation considering application of condition monitoring systems for elements and sub-systems of petrochemical production facilities. The main task for the research is to distinguish factors and criteria of monitoring system properties description, which would allow to evaluate impact of errors made by personnel on operation of real-time condition monitoring and diagnostic systems for machinery of petrochemical facilities, and find and objective criteria for monitoring system class, considering a human factor. On the basis of real-time condition monitoring concepts of sudden failure skipping risk, static and dynamic error, monitoring systems, one may solve a task of evaluation of impact that personnel's qualification has on monitoring system operation in terms of error in personnel or operators' actions while receiving information from monitoring systems and operating a technological system. Operator is considered as a part of the technological system. Although, personnel's behavior is usually a combination of the following parameters: input signal - information perceiving, reaction - decision making, response - decision implementing. Based on several researches on behavior of nuclear powers station operators in USA, Italy and other countries, as well as on researches conducted by Russian scientists, required data on operator's reliability were selected for analysis of operator's behavior at technological facilities diagnostics and monitoring systems. The calculations revealed that for the monitoring system selected as an example, the failure skipping risk for the set values of static (less than 0.01) and dynamic (less than 0.001) errors considering all related factors of data on reliability of information perception, decision-making, and reaction fulfilled is 0.037, in case when all the facilities and error probability are under

  20. Vehicle Remote Health Monitoring and Prognostic Maintenance System

    Directory of Open Access Journals (Sweden)

    Uferah Shafi

    2018-01-01

    Full Text Available In many industries inclusive of automotive vehicle industry, predictive maintenance has become more important. It is hard to diagnose failure in advance in the vehicle industry because of the limited availability of sensors and some of the designing exertions. However with the great development in automotive industry, it looks feasible today to analyze sensor’s data along with machine learning techniques for failure prediction. In this article, an approach is presented for fault prediction of four main subsystems of vehicle, fuel system, ignition system, exhaust system, and cooling system. Sensor is collected when vehicle is on the move, both in faulty condition (when any failure in specific system has occurred and in normal condition. The data is transmitted to the server which analyzes the data. Interesting patterns are learned using four classifiers, Decision Tree, Support Vector Machine, K Nearest Neighbor, and Random Forest. These patterns are later used to detect future failures in other vehicles which show the similar behavior. The approach is produced with the end goal of expanding vehicle up-time and was demonstrated on 70 vehicles of Toyota Corolla type. Accuracy comparison of all classifiers is performed on the basis of Receiver Operating Characteristics (ROC curves.

  1. Maintenance of the JET active gas handling system

    International Nuclear Information System (INIS)

    Brennan, P.D.; Bell, A.C.; Brown, K.; Cole, C.; Cooper, B.; Gibbons, C.; Harris, M.; Jones, G.; Knipe, S.; Lewis, J.; Manning, C.; Miller, A.; Perevezentsev, A.; Skinner, N.; Stagg, R.; Stead, M.; Thomas, R.; Yorkshades, J.

    2003-01-01

    The JET active gas handling system (AGHS) has been in operation in conjunction with the JET machine since Spring 1997. The tritium levels within the vessel have remained sufficiently high, 6.2 g at the end of the DTE1 experiment and currently 1.5 g, such that the AGHS has been required to operate continuously to detritiate gases liberated during D-D operations and to maintain discharges to the environment to ALARP. Maintaining the system to ensure continued operation has been a key factor in guaranteeing the continued availability of the essential sub-systems. The operational history of the JET AGHS has been previously documented in a number of papers [R. Laesser, et al. Proc. of the 19th SOFT Conf. 1 (1996) 227; R. Laesser, et al., Fusion Eng. Des. 46 (1999) 307; P.D. Brennan, et al., 18th Symp. on Fusion Eng., 1999]. Operational downtime is minimised through well-engineered sub-systems that use high integrity components. Outage, contamination and operator dosage are minimised through pre-planned and prepared maintenance operations. The reliability of sub-system critical condition fault detection is demonstrated through routine testing of hard-wired alarms and interlocks

  2. JIT maintenance improves the productivity and energy efficiency of the system

    Directory of Open Access Journals (Sweden)

    Marković Željko M.

    2016-01-01

    Full Text Available Maintenance planning in order to ensure the smooth functioning of the system, optimal interaction of system with the environment, and timely responses to the set requirements is one of the most important internal resources of the organization. Just-In-Time Maintenance enables rarely downtime and lower maintenance costs throughout the life cycle of the system, and dramatically increases the productivity and energy efficiency of the entire system. By adopting of the Just-In-Time Maintenance philosophy, minimum of objective function of energy or production system, as well as of production of services system, is achieved.

  3. A condition-based maintenance policy for multi-component systems with a high maintenance setup cost

    NARCIS (Netherlands)

    Zhu, Q.; Peng, H.; Houtum, van G.J.J.A.N.

    2015-01-01

    Condition-based maintenance (CBM) is becoming increasingly important due to the development of advanced sensor and information technology, which facilitates the remote collection of condition data. We propose a new CBM policy for multi-component systems with continuous stochastic deteriorations. To

  4. A condition-based maintenance policy for multi-component systems with a high maintenance setup cost

    NARCIS (Netherlands)

    Zhu, Q.; Peng, H.; Houtum, van G.J.J.A.N.

    2012-01-01

    Condition-based maintenance (CBM) is becoming increasingly important due to the development of advanced sensor and ICT technology, so that the condition data can be collected remotely. We propose a new CBM policy for multi-component systems with continuous stochastic deteriorations. To reduce the

  5. Morbidity rate of nervous system among medical personnel occupationally exposed to chronic low dose irradiation

    International Nuclear Information System (INIS)

    Jonkova, A.

    1987-01-01

    The morbidity rate of the nervous system among 1190 subjects, medical personnel, working with sources and environment of ionizing radiation was studied by the personal analysis of the diseases, written down in the personal out-patient department cards as well as of a control group of 870 medical workers of various other specialities. The morbidity rate of the nervous system among the medical personnel, exposed to chronic occupational radiation effect, was established not to be higher than that of the other medical workers - 38.0 and 40.3% respectively. Neuroses and peripheral nervous diseases have the greatest relative share in the structure of morbidity rate of the nervous system in both groups examined, with no statistical significance in the differences of the indices. The significantly higher incidence of autonome dystonias, established among the personnel from the X-ray departments and consulting rooms could be discussed in connection with the great relative share of the subjects from that group with a length of service over 15 years and had received the possible maximum cumulative equivalent doses. 3 tabs., 21 refs

  6. 28 CFR 16.132 - Exemption of Department of Justice System-Personnel Investigation and Security Clearance Records...

    Science.gov (United States)

    2010-07-01

    ... System—Personnel Investigation and Security Clearance Records for the Department of Justice (DOJ), DOJ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Exemption of Department of Justice System-Personnel Investigation and Security Clearance Records for the Department of Justice (DOJ), DOJ-006. 16.132...

  7. Flexible maintenance system (FMS). Background, concept, and results of technical development

    International Nuclear Information System (INIS)

    Yoshikawa, Hidekazu; Watanabe, Osami; Takizawa, Yoji; Ohga, Yukiharu; Ohi, Tadashi

    2006-01-01

    Maintenance works of nuclear power plants have been involved with various people and organizations. Thus human errors are apt to be made. Since 2000, the project on development of flexible maintenance system (FMS) has been conducted for five years in order to make maintenance works more rational and reduce human errors probability. Background, concept and results of technical development to upgrade maintenance works and training are reviewed. Advanced technology such as optical viewing equipments, laser holography inspection systems and neural networks shall be applied to maintenance works. (T. Tanaka)

  8. State of technology, system and solution supporting on-line maintenance - company's activities and products

    International Nuclear Information System (INIS)

    Nishitani, Junichi; Shimizu, Shunichi; Higasa, Hisakazu

    2010-01-01

    The new inspection system based on operator's maintenance and monitoring program of nuclear power plants was introduced in Japan more than one year ago and recommended on-line maintenance (maintenance during operation) will be carried out to increase capacity factor with safe and reliable operation of the plant. In this feature article, nine experts described the state of technology, system and solution supporting on-line maintenance - company's activities and products. These were titled as 'MHI's technology supporting on-line maintenance'. 'Technology supporting on-line maintenance - Toshiba's activities to upgrade monitoring and diagnostic service and maintenance management', 'AsahiKASEI's activities of on-line maintenance', 'Importance of information sharing of on-line maintenance and its ideal method-function of impact plan of IBM Maximo Asset Management for Nuclear', 'US's on-line maintenance and information systems', 'SmartProcedures realizing safe operation of nuclear power plant - proposal of computerized procedures', 'Ultrasonic leak detection system SDT170', 'Application of infrared thermography for equipment maintenance in nuclear power plant' and 'On-line condition monitoring system - condition eye'. (T. Tanaka)

  9. A novel approach for modelling complex maintenance systems using discrete event simulation

    International Nuclear Information System (INIS)

    Alrabghi, Abdullah; Tiwari, Ashutosh

    2016-01-01

    Existing approaches for modelling maintenance rely on oversimplified assumptions which prevent them from reflecting the complexity found in industrial systems. In this paper, we propose a novel approach that enables the modelling of non-identical multi-unit systems without restrictive assumptions on the number of units or their maintenance characteristics. Modelling complex interactions between maintenance strategies and their effects on assets in the system is achieved by accessing event queues in Discrete Event Simulation (DES). The approach utilises the wide success DES has achieved in manufacturing by allowing integration with models that are closely related to maintenance such as production and spare parts systems. Additional advantages of using DES include rapid modelling and visual interactive simulation. The proposed approach is demonstrated in a simulation based optimisation study of a published case. The current research is one of the first to optimise maintenance strategies simultaneously with their parameters while considering production dynamics and spare parts management. The findings of this research provide insights for non-conflicting objectives in maintenance systems. In addition, the proposed approach can be used to facilitate the simulation and optimisation of industrial maintenance systems. - Highlights: • This research is one of the first to optimise maintenance strategies simultaneously. • New insights for non-conflicting objectives in maintenance systems. • The approach can be used to optimise industrial maintenance systems.

  10. A marriage of tradition and new technology into a strategic plan for maintenance at Martin Marietta Energy Systems, Inc

    International Nuclear Information System (INIS)

    Miller, D.R.

    1992-01-01

    During the past several years, the management focus of US Department of Energy (DOE) contractors has sharpened to include an aggressive reassessment of facility support functions. A vast majority of DOE buildings and equipment are 30 to 40 years old. This presentation discusses the scope of the maintenance challenge and some of the strategic plans and actions now in progress. As a new DOE contractor, Energy Systems began to infuse a top-down management style into its operations approximately seven years ago. Previously, autonomous operations such as gaseous diffusion plants and the national laboratory were directed to follow more uniform policies and procedures. More recently, DOE's assessments and self-assessments of facilities have permitted a formal approach to the replacement of old equipment. In 1990 an Energy Systems corporate decision was made to bring a top-down approach to the performance of maintenance. A long standing corporate Maintenance Managers Committee was given a new charter. Representatives of all five Energy Systems sites were asked by top management to look ahead and identify appropriate strategic goals. These goals must assist the diverse operations to achieve more consistency and to use new technology to improve equipment reliability. Specific goals identified were increased safety to personnel, extended equipment life, increased overall productive time, improved product quality, and greater cost effectiveness of maintenance efforts. Yet another area of interest and search for innovation is in human resource development. Traditionally, human resource development in maintenance has focused on academic advancement for salaried staff and unrelated task or safety training for hourly staff. In the future, training and education for all employees will be better coordinated to achieve the overall goals

  11. Performance-based maintenance of gas turbines for reliable control of degraded power systems

    Science.gov (United States)

    Mo, Huadong; Sansavini, Giovanni; Xie, Min

    2018-03-01

    Maintenance actions are necessary for ensuring proper operations of control systems under component degradation. However, current condition-based maintenance (CBM) models based on component health indices are not suitable for degraded control systems. Indeed, failures of control systems are only determined by the controller outputs, and the feedback mechanism compensates the control performance loss caused by the component deterioration. Thus, control systems may still operate normally even if the component health indices exceed failure thresholds. This work investigates the CBM model of control systems and employs the reduced control performance as a direct degradation measure for deciding maintenance activities. The reduced control performance depends on the underlying component degradation modelled as a Wiener process and the feedback mechanism. To this aim, the controller features are quantified by developing a dynamic and stochastic control block diagram-based simulation model, consisting of the degraded components and the control mechanism. At each inspection, the system receives a maintenance action if the control performance deterioration exceeds its preventive-maintenance or failure thresholds. Inspired by realistic cases, the component degradation model considers random start time and unit-to-unit variability. The cost analysis of maintenance model is conducted via Monte Carlo simulation. Optimal maintenance strategies are investigated to minimize the expected maintenance costs, which is a direct consequence of the control performance. The proposed framework is able to design preventive maintenance actions on a gas power plant, to ensuring required load frequency control performance against a sudden load increase. The optimization results identify the trade-off between system downtime and maintenance costs as a function of preventive maintenance thresholds and inspection frequency. Finally, the control performance-based maintenance model can reduce

  12. System maintenance test plan for the TWRS controlled baseline database system

    International Nuclear Information System (INIS)

    Spencer, S.G.

    1998-01-01

    TWRS [Tank Waste Remediation System] Controlled Baseline Database, formally known as the Performance Measurement Control System, is used to track and monitor TWRS project management baseline information. This document contains the maintenance testing approach for software testing of the TCBD system once SCR/PRs are implemented

  13. Building relationships for better maintenance.

    Science.gov (United States)

    Lee, Hackman Hon Yin; Scott, David

    2009-02-01

    Effective management of building maintenance is a vital ingredient in ensuring a high quality built environment for any building's occupiers. However, maintenance is not high on the list of priorities for most organisations. Communication between top management personnel looking at maintenance issues from a strategic standpoint and maintenance staff considering them at an operational level is often not as good as it should be. When planning maintenance activities maintenance personnel often draw too heavily on their technical experience and expertise without taking sufficient account of wider organisational objectives or consulting effectively with top management. Senior managers also regularly complain about lack of managerial input from maintenance departments. Such barriers contribute to communication difficulties between top management at a strategic level and maintenance personnel at an operational level. Identifying where the key differences lie in senior managers' and maintenance personnel's viewpoints on maintenance strategy can prove invaluable in achieving some convergence of opinions and optimising the efficiency of the overall building maintenance process.

  14. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT IV, MAINTAINING THE COOLING SYSTEM--DETROIT DIESEL ENGINES.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE COOLING SYSTEM. TOPICS ARE PURPOSE OF THE COOLING SYSTEM, CARE MAINTENANCE OF THE COOLING SYSTEM, COOLING SYSTEM COMPONENTS, AND TROUBLESHOOTING TIPS. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING…

  15. Quality assurance manual for the Department of Energy laboratory accreditation program for personnel dosimetry systems

    International Nuclear Information System (INIS)

    1987-02-01

    The overall purpose of this document is to establish a uniform approach to quality assurance. This will ensure that uniform, high-quality personnel dosimetry practices are followed by the participating testing laboratories. The document presents guidelines for calibrating and maintaining measurement and test equipment (M and TE), calibrating radiation fields, and subsequently irradiating and handling personnel dosimeters in laboratories involved in the DOE dosimetry systems testing program. Radiation energies for which the test procedures apply are photons with approximately 15 keV to 2 MeV, beta particles above 0.3 MeV, neutrons with approximately 1 keV to 2 MeV. 12 refs., 4 tabs

  16. US Department of Energy Laboratory Accreditation Program for personnel dosimetry systems (DOELAP)

    International Nuclear Information System (INIS)

    Carlson, R.D.; Gesell, T.F.; Kalbeitzer, F.L.; Roberson, P.L.; Jones, K.L.; MacDonald, J.C.; Vallario, E.J.; Pacific Northwest Lab., Richland, WA; USDOE Assistant Secretary for Nuclear Energy, Washington, DC

    1988-01-01

    The US Department of Energy (DOE) Office of Nuclear Safety has developed and initiated the DOE Laboratory Accreditation Program (DOELAP) for personnel dosimetry systems to assure and improve the quality of personnel dosimetry at DOE and DOE contractor facilities. It consists of a performance evaluation program that measures current performance and an applied research program that evaluates and recommends additional or improved test and performance criteria. It also provides guidance to DOE, identifying areas where technological improvements are needed. The two performance evaluation elements in the accreditation process are performance testing and onsite assessment by technical experts. Performance testing evaluates the participant's ability to accurately and reproducibly measure dose equivalent. Tests are conducted in accident level categories for low- and high-energy photons as well as protection level categories for low- and high-energy photons, beta particles, neutrons and mixtures of these

  17. Facilities and procedures used for the performance testing of DOE personnel dosimetry systems

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, P.L.; Fox, R.A.; Hogan, R.T.; Holbrook, K.L.; Hooker, C.D.; Yoder, R.C.

    1983-04-01

    Radiological calibration facilities for personnel dosimeter testing were developed at the Pacific Northwest Laboratory (PNL) for the Department of Energy (DOE) to provide a capability for evaluating the performance of DOE personnel dosimetry systems. This report includes the testing methodology used. The informational presented here meets requirements specified in draft ANSI N13.11 for the testing laboratory. The capabilities of these facilities include sealed source irradiations for /sup 137/Cs, several beta-particle emitters, /sup 252/Cf, and machine-generated x-ray beams. The x-ray beam capabilities include filtered techniques maintained by the National Bureau of Standards (NBS) and K-fluorescent techniques. The calibration techniques, dosimeter irradiation procedures, and dose-equivalent calculation methods follow techniques specified by draft ANSI N13.11 where appropriate.

  18. Facilities and procedures used for the performance testing of DOE personnel-dosimetry systems

    International Nuclear Information System (INIS)

    Roberson, P.L.; Fox, R.A.; Hogan, R.T.; Holbrook, K.L.; Hooker, C.D.; Yoder, R.C.

    1983-04-01

    Radiological calibration facilities for personnel dosimeter testing were developed at the Pacific Northwest Laboratory (PNL) for the Department of Energy (DOE) to provide a capability for evaluating the performance of DOE personnel dosimetry systems. This report includes the testing methodology used. The informational presented here meets requirements specified in draft ANSI N13.11 for the testing laboratory. The capabilities of these facilities include sealed source irradiations for 137 Cs, several beta-particle emitters, 252 Cf, and machine-generated x-ray beams. The x-ray beam capabilities include filtered techniques maintained by the National Bureau of Standards (NBS) and K-fluorescent techniques. The calibration techniques, dosimeter irradiation procedures, and dose-equivalent calculation methods follow techniques specified by draft ANSI N13.11 where appropriate

  19. Optimizing preventive maintenance policy: A data-driven application for a light rail braking system.

    Science.gov (United States)

    Corman, Francesco; Kraijema, Sander; Godjevac, Milinko; Lodewijks, Gabriel

    2017-10-01

    This article presents a case study determining the optimal preventive maintenance policy for a light rail rolling stock system in terms of reliability, availability, and maintenance costs. The maintenance policy defines one of the three predefined preventive maintenance actions at fixed time-based intervals for each of the subsystems of the braking system. Based on work, maintenance, and failure data, we model the reliability degradation of the system and its subsystems under the current maintenance policy by a Weibull distribution. We then analytically determine the relation between reliability, availability, and maintenance costs. We validate the model against recorded reliability and availability and get further insights by a dedicated sensitivity analysis. The model is then used in a sequential optimization framework determining preventive maintenance intervals to improve on the key performance indicators. We show the potential of data-driven modelling to determine optimal maintenance policy: same system availability and reliability can be achieved with 30% maintenance cost reduction, by prolonging the intervals and re-grouping maintenance actions.

  20. Operations and maintenance of the Gasunie Transportation System

    Energy Technology Data Exchange (ETDEWEB)

    Panman, Bert

    1999-07-01

    Gasunie is a one-of-a-kind company in the Netherlands. It has been trading and transmitting of natural gas since the 1960's. The company has a dominant position: 90% market share in the Netherlands and 23% in Western Europe. This presentation introduces the company and describes its 11,398 km long grid system, with compressor stations, blending stations, metering and regulation stations, gas delivery stations, export stations, storage of LNG, calibration systems and nitrogen plant. Gasunie experiences a changing environment characterized by liberalization of the gas market and technological development. The response of the company to this changing environment is overviewed. In addition to revising the commercial strategy, Gasunie continuously tries to cut costs by enabling information technology (IT), reduction of staff and other organizational changes, benchmarking, scrutinizing maintenance policies, and smart purchasing of goods and services. These efforts are discussed in turn. Finally, the implementation of SAP R/3 is discussed. SAP R/3 is SAP's integrated software solution for Client/Server and Distributed Open Systems.

  1. The development of robot system for pressurizer maintenance in NPPs

    International Nuclear Information System (INIS)

    Kim, Seung Ho; Kim, Chang Hoi; Jung, Seung Ho; Seo, Yong Chil; Lee, Young Kwang; Go, Byung Yung; Lee, Kwang Won; Lee, Sang Ill; Yun, Jong Yeon; Lee, Hyung Soon; Park, Mig Non; Park, Chang Woo; Cheol, Kwon

    1999-12-01

    The pressurizer that controls the pressure variation of primary coolant system, consists of a vessel, electric heaters and a spray, is one of the safety related equipment in nuclear power plants. Therefore it is required to inspect and maintain it regularly. Because the inside of pressurizer os contaminated by radioactivity, when inspection and repairing it, the radiation exposure of workers is inevitable. In this research two robot system has been developed for inspection and maintenance of the pressurizer for the water filled case and the water sunken case. The one robot system for the water filled case consists of two links, movable gripper using wire string, and support frame for the attachment of robot. The other robot is equipped propeller in order to navigate on the water. It also equipped high performance water resistance camera to make inspection possible. The developed robots are designed under several constraints such as its weight and collision with pressurizer wall. To verify the collision free robot link length and accessibility to the any desired rod heater it is simulated by 3-dimensional graphic simulation software(RobCard). For evaluation stress of the support frame finite element analysis is performed by using the ANSYS code. (author)

  2. PLC based control system and maintenance activities at NCAR, Bilaspur

    International Nuclear Information System (INIS)

    Dewangan, Jaidev; Trivedi, T.; Patel, Shiv P.; Malik, C.; Kumar, Rakesh; Gupta, Santosh Kumar; Bajpai, P.K.

    2015-01-01

    A 3.0 MV high current low energy Pelletron Accelerator facility (Model 9SDH-4, NEC, USA) with TORUIS (ion source for H + and He 2+ beam current H + ion ∼ 50μA @ 6 MeV, He 2+ at ∼ 10μA) and SNICS-II ion source for heavy ions has been commissioned as 'National Centre for Accelerator Based Research' in the Department of Pure and Applied Physics, Guru Ghasidas Vishwavidyalaya. In this paper, we detail out the control system developed and implemented at NCAR. The basic idea of controlling the machine is by providing the output signal through PLC to ACPC of accelerator using user interface points provided by the manufacturer. The PLC based system generates output signal once it receives the feedback signals from search and secure switches, door lock switches and scram switches interlocked with PLC. The output is controlled by ladder logic and is activated only when all the radiation monitors are in healthy state and outside radiations monitor having low radiation level. The details of control system and maintenance activities will be discussed in the paper

  3. Operating and maintenance experience of Dhruva secondary shutdown system

    International Nuclear Information System (INIS)

    Sharma, U.L.; Bharathan, R.

    1997-01-01

    Nine numbers of cadmium shut-off rods are used as primary fast acting shutdown devices while moderator dumping is used as secondary shutdown system. The secondary shutdown system in Dhruva reactor comprises of 3 dump valves and 3 control valves. Under normal operations, the control valves are used to control the moderator level and thereby the reactor power. Under Trip conditions the dump valves as well as the control valves open fully, dumping the moderator to the dump tank, thereby acting as secondary shutdown devices. While the failure of any of these valves to close fully is an incident, the failure of any of these valves to open on a demand is a safety related unusual occurrence and needs to be viewed seriously. During the last 11 years of operation of these valves, there was one incidence of a valve not closing fully and there were two instances of a valve not opening fully on demand. The possible causes, the corrective action taken to rehabilitate these valves and the elaborate system preparations undertaken to enable maintenance jobs are described. (author)

  4. Information Management System Development for the Characterization and Analysis of Human Error in Naval Aviation Maintenance Related Mishaps

    National Research Council Canada - National Science Library

    Wood, Brian

    2000-01-01

    .... The Human Factors Analysis and Classification System-Maintenance Extension taxonomy, an effective framework for classifying and analyzing the presence of maintenance errors that lead to mishaps...

  5. Computer based training for NPP personnel (interactive communication systems and functional trainers)

    International Nuclear Information System (INIS)

    Martin, H.D.

    1987-01-01

    KWU as a manufacturer of thermal and nuclear power plants has extensive customer training obligations within its power plant contracts. In this respect KWU has gained large experience in training of personnel, in the production of training material including video tapes an in the design of simulators. KWU developed interactive communication systems (ICS) for training and retraining purposes with a personal computer operating a video disc player on which video instruction is stored. The training program is edited with the help of a self developed editing system which enables the author to easily enter his instructions into the computer. ICS enables the plant management to better monitor the performance of its personnel through computerized training results and helps to save training manpower. German NPPs differ very much from other designs with respect to a more complex and integrated reactor control system and an additional reactor limitation system. Simulators for such plants therefore have also to simulate these systems. KWU developed a Functional Trainer (FT) which is a replica of the primary system, the auxiliary systems linked to it and the associated control, limitation and protection systems including the influences of the turbine operation and control

  6. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    1982-01-01

    This Guide covers the organizational and procedural aspects of maintenance but does not give detailed technical advice on the maintenance of particular plant items. It gives guidance on preventive and remedial measures necessary to ensure that all structures, systems and components important to safety are capable of performing as intended. The Guide covers the organizational and administrative requirements for establishing and implementing preventive maintenance schedules, repairing defective plant items, providing maintenance facilities and equipment, procuring stores and spare parts, selecting and training maintenance personnel, reviewing and controlling plant modifications arising from maintenance, and for generating, collecting and retaining maintenance records. Maintenance shall be subject to quality assurance in all aspects important to safety. Because quality assurance has been dealt with in detail in other Safety Guides, it is only included here in specific instances where emphasis is required. Maintenance is considered to include functional and performance testing of plant, surveillance and in-service inspection, where these are necessary either to support other maintenance activities or to ensure continuing capability of structures, systems and components important to safety to perform their intended functions

  7. Status on system inspection and preventive maintenance of HANARO

    International Nuclear Information System (INIS)

    Kim, Young-Ki; Cho, Yeong-Garp; Kwag, Byung-Ho

    1999-01-01

    The HANARO is a 30 MW open pool type multi-purpose research reactor with forced light water coolant/moderator flows and heavy water annular reflector. The relatively small reactor core uses a low enriched fuel and is designed to maximize the power density, thus providing the required neutron flux for various research activities. It is mainly used for radioisotope production, nuclear material testing and neutron physics experiments. The initial criticality was achieved February 1995. Considering the importance of their functionality from the safety point of view, some components and equipment are categorized into a nuclear safety grade. There are three different inspection activities for the various reactor systems and components - a Surveillance Inspection(SI) for the safety grades and a Periodic Inspection (PI) for the non-safety grades and In-Service Inspection (ISI) for the ASME Sec.III components. All of the SIs are specified and required by the safety analysis report. The SI also differs from the PI in such a point that all kinds of activities for the SIs should be accompanied by an appropriate quality assurance, while for the PIs it is not necessarily mandatory. In addition, the inspection results for the SIs should go through an examination from regulatory body every two years and specific functions of the critical components or systems are demonstrated under the witness by the governmental inspector. The ISI is required and carried out as per international codes and standards as well as Korean atomic energy regulations. There are 54 SIs, 25 PIs and 4 ISIs for the HANARO. This paper concentrates on the managing strategy and its practices for the SIs and ISIs of the safety-related components, currently being done at HANARO. Most parts of the inspections fall into a group for the periodic performance testing and/or equipment calibration. Some mechanical inspections like a torque measurement are grouped into a preventive maintenance. Lastly the ASME Sec

  8. Development of support system for maintenance and administration of reprocessing plant equipment

    International Nuclear Information System (INIS)

    Iwasaki, Syogo; Taniguchi, Takayuki; Shiraishi, Yoshihiko; Isaka, Kazuo

    1998-01-01

    Each year, maintenance work is carried out for about 10,000 pieces of equipment, including mechanical devices, electric equipment and instruments, at the Tokai Reprocessing Plant. Ninety percent of such maintenance work is preventive maintenance. In order to manage the information about the maintenance work, a computer support system was developed between 1985 and 1992. Twenty-seven thousand pieces of equipment and 180,000 maintenance histories have already been registered in the system. The system has been used for planning inspections and replacement of equipment as well as checking their maintenance histories. Actual usage of the system has shown that some auxiliary functions need to be added. The system will therefore be improved and extended. (author)

  9. Exact reliability quantification of highly reliable systems with maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Bris, Radim, E-mail: radim.bris@vsb.c [VSB-Technical University Ostrava, Faculty of Electrical Engineering and Computer Science, Department of Applied Mathematics, 17. listopadu 15, 70833 Ostrava-Poruba (Czech Republic)

    2010-12-15

    When a system is composed of highly reliable elements, exact reliability quantification may be problematic, because computer accuracy is limited. Inaccuracy can be due to different aspects. For example, an error may be made when subtracting two numbers that are very close to each other, or at the process of summation of many very different numbers, etc. The basic objective of this paper is to find a procedure, which eliminates errors made by PC when calculations close to an error limit are executed. Highly reliable system is represented by the use of directed acyclic graph which is composed from terminal nodes, i.e. highly reliable input elements, internal nodes representing subsystems and edges that bind all of these nodes. Three admissible unavailability models of terminal nodes are introduced, including both corrective and preventive maintenance. The algorithm for exact unavailability calculation of terminal nodes is based on merits of a high-performance language for technical computing MATLAB. System unavailability quantification procedure applied to a graph structure, which considers both independent and dependent (i.e. repeatedly occurring) terminal nodes is based on combinatorial principle. This principle requires summation of a lot of very different non-negative numbers, which may be a source of an inaccuracy. That is why another algorithm for exact summation of such numbers is designed in the paper. The summation procedure uses benefits from a special number system with the base represented by the value 2{sup 32}. Computational efficiency of the new computing methodology is compared with advanced simulation software. Various calculations on systems from references are performed to emphasize merits of the methodology.

  10. Application of expert system in measurement instrument instrumentation's maintenance on a acquisition system

    International Nuclear Information System (INIS)

    Pinastiko, W.S.

    1997-01-01

    Expert system is a part of the artificial intelligence, a solution software for complicated problems, which solving the problems need experiences and knowledge. This paper discussed about the research's result, that is a design of expert system to help instrumentation's maintenance on a data acquisition system. By using application of expert system, the system can do health monitoring, automatic trouble trouble tracing ang gives advise toward the trouble. this instrumentation's maintenance system is a tool which has an analytic and inference ability toward th trouble. This smart system is a very useful tool to get a good data acquisition system quality. the model system also can be developed to be a specific application as a remote instrumentation's management system

  11. Designing remote monitoring systems for long term maintenance and reliability

    International Nuclear Information System (INIS)

    Davis, G.E.; Johnson, G.L.; Schrader, F.D.; Stone, M.A.; Wilson, E.F.

    2001-01-01

    Full text: As part of the effort to modernize safeguards equipment, the IAEA is continuing to acquire and install equipment for upgrading obsolete surveillance systems with digital technology; and providing remote-monitoring capabilities where and when economically justified. Remote monitoring is expected to reduce inspection effort, particularly at storage facilities and reactor sites. Remote monitoring technology will not only involve surveillance, but will also include seals, sensors, and other unattended measurement equipment. LLNL's experience with the Argus Security System offers lessons for the design, deployment, and maintenance of remote monitoring systems. Argus is an integrated security system for protection of high-consequence U.S. Government assets, including nuclear materials. Argus provides secure transmission of sensor data, administrative data, and video information to support intrusion detection and access control functions. LLNL developed and deployed the Argus system on its own site in 1988. Since that time LLNL has installed, maintained, and upgraded Argus systems at several Department of Energy and Department of Defense sites in the US as well as at the original LLNL site. Argus has provided high levels of reliability and integrity, as well as reducing overall lifecycle cost through incremental improvements to hardware and software. This philosophy permits expansion of functional capability, hardware upgrade and software upgrade without system outages and with minimum outage of local functions. This presentation will describe Argus design strategies and lessons learned from the Argus program as they apply to the design, development, and maintenance of a remote monitoring network. Hardware failures, software failures, and communication outages are expected and must be addressed by astute selection of system architecture. A combination of redundancy, diversity, and effective functional allocation between field and system level components should

  12. RA reactor operation and maintenance in 1992, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Tanaskovic, M.

    1992-01-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems [sr

  13. SLIB77, Source Library Data Compression and File Maintenance System

    International Nuclear Information System (INIS)

    Lunsford, A.

    1989-01-01

    Description of program or function: SLIB77 is a source librarian program designed to maintain FORTRAN source code in a compressed form on magnetic disk. The program was prepared to meet program maintenance requirements for ongoing program development and continual improvement of very large programs involving many programmers from a number of different organizations. SLIB77 automatically maintains in one file the source of the current program as well as all previous modifications. Although written originally for FORTRAN programs, SLIB77 is suitable for use with data files, text files, operating systems, and other programming languages, such as Ada, C and COBOL. It can handle libraries with records of up to 160-characters. Records are grouped into DECKS and assigned deck names by the user. SLIB77 assigns a number to each record in each DECK. Records can be deleted or restored singly or as a group within each deck. Modification records are grouped and assigned modification identification names by the user. The program assigns numbers to each new record within the deck. The program has two modes of execution, BATCH and EDIT. The BATCH mode is controlled by an input file and is used to make changes permanent and create new library files. The EDIT mode is controlled by interactive terminal input and a built-in line editor is used for modification of single decks. Transferring of a library from one computer system to another is accomplished using a Portable Library File created by SLIB77 in a BATCH run

  14. Development and radiation evaluation of mobile station for personnel monitoring system based on indigenous plastic scintillator sensor rods

    International Nuclear Information System (INIS)

    Chaudhary, H.S.; Parihar, A.; Senwar, K.R.; Prakash, V.; Rathore, A.S.

    2018-01-01

    The Mobile Station for Personnel Monitoring (MSPM) system has been designed and developed for rapid screening of personnel with respect to radiation contamination during nuclear or radiological emergency; it can also be used for prevention of illicit movement of radioactive sources. The objective was to develop a modular, transportable and easily deployable gamma portal monitoring system based on indigenous DLJ developed plastic scintillator sensors. The Gamma radiation response of the system is presented here

  15. Measurement of Water Quality Parameters for Before and After Maintenance Service in Water Filter System

    Directory of Open Access Journals (Sweden)

    Shaharudin Nuraida

    2017-01-01

    Full Text Available An adequate supply of safe drinking water is one of major ways to obtain healthy life. Water filter system is one way to improve the water quality. However, to maintain the performance of the system, it need to undergo the maintenance service. This study evaluate the requirement of maintenance service in water filter system. Water quality was measured before and after maintenance service. Parameters measured were pH, turbidity, residual chlorine, nitrate and heavy metals and these parameters were compared with National Drinking Water Quality Standards. Collection of data were involved three housing areas in Johor. The quality of drinking water from water filter system were analysed using pH meter, turbidity meter, DR6000 and Inductively Coupled Plasma-Mass Spectrometer. pH value was increased from 16.4% for before maintenance services to 30.7% for after maintenance service. Increment of removal percentage for turbidity, residual chlorine and nitrate after maintenance were 21.5, 13.6 and 26.7, respectively. This result shows that maintenance service enhance the performance of the system. However, less significant of maintenance service for enhance the removal of heavy metals which the increment of removal percentage in range 0.3 to 9.8. Only aluminium shows percentage removal for after maintenance with 92.8% lower compared to before maintenance service with 95.5%.

  16. Radiation dose to procedural personnel and patients from an X-ray volume imaging system

    International Nuclear Information System (INIS)

    Paul, Jijo; Mbalisike, Emmanuel C.; Vogl, Thomas J.

    2013-01-01

    To evaluate the radiation dose received by procedural personnel and patients from an X-ray volume imaging (XVI) system during interventional procedures. Forty patients were examined using catheter angiography (group A), digital subtraction angiography (group B) and cone-beam CT (CBCT, group C). Doses to procedural personnel (using thermo-luminescent dosimeters, TLDs) and patients were estimated. Image quality and lesion delineation were assessed using objective and subjective methods. Shapiro-Wilk, two-sided Student's t and Wilcoxon matched-pairs tests were used to test statistical significance. Doses (milligrays) measured in the hands and left knee of the interventionist were higher than those in an assistant physician (P < 0.05). Doses (dose-area product and skin entry dose) were lower in group A and higher in C compared with other groups; moreover, comparison among the groups were significant (all P = 0.0001). Subjective and objective lesion delineation showed significant results (all P < 0.05) among the tumour types considered. Image quality estimation showed the opposite results for objective and subjective analysis. More doses were obtained for hands of the procedural personnel compared to other anatomical regions measured. Catheter angiography showed lower dose compared with other imaging groups examined. Lesion delineation was clearly possible using CBCT. Objective and subjective analysis showed the opposite results regarding image quality because of higher noise levels and artefacts. (orig.)

  17. TAX SYSTEM FOR MEMBERS OF THE PERSONNEL LIVING IN FRANCE - DECLARATION OF INCOME FOR 2003 -

    CERN Document Server

    HR Department

    2004-01-01

    (Please see the web pages) Important The French tax authorities have informed the Organization of certain changes to the tax system applicable to certain members of the CERN personnel residing in France. The CERN Management is currently seeking to clarify a number of points relating to the application of these measures. For the moment, members of the personnel residing in France are requested to follow the instructions(1) outlined below and any other related instructions published later in 2004. To deal with the increasing number of requests for personal advice, the Human Resources Department has set up a Help-Desk, on 72838, which will direct you to the relevant in-house or outside services. However, as the Human Resources Department cannot speak for the tax authorities and does not have the necessary resources to handle all the problems that are referred to it, members of the personnel are strongly urged to contact the French tax authorities directly, either at the information desks organised at the pla...

  18. TAX SYSTEM FOR MEMBERS OF THE PERSONNEL LIVING IN FRANCE -DECLARATION OF INCOME FOR 1999-

    CERN Document Server

    Division des ressources humaines

    2000-01-01

    This text is also available on the Human Resources Division Web site.ImportantThe French tax authorities have informed the Organisation of certain changes to the tax system applicable to certain members of the CERN personnel residing in France. The CERN Management is currently seeking to clarify a number of points relating to the application of these measures. For the moment, members of the personnel residing in France are requested to follow the intructions outlined below and any other related instructions published later in 2000.To deal with the increasing number of requests for personal advice, the Human Resources Division has set up a Help-Desk, on 72838, which will direct you to the relevant in-house or outside services.However, as the Human Resources Division cannot speak for the tax authorities and does not have the necessary resources to handle all the problems that are referred to it, members of the personnel are strongly urged to contact the French tax authorities directly, either at the information...

  19. LIPAc personnel protection system for realizing radiation licensing conditions on injector commissioning with deuteron beam

    Energy Technology Data Exchange (ETDEWEB)

    Takahashi, Hiroki, E-mail: takahashi.hiroki@jaea.go.jp [IFMIF/EVEDA Accelerator Group, Japan Atomic Energy Agency (JAEA), Rokkasho, Aomori (Japan); Narita, Takahiro; Kasugai, Atsushi [IFMIF/EVEDA Accelerator Group, Japan Atomic Energy Agency (JAEA), Rokkasho, Aomori (Japan); Kojima, Toshiyuki [Gitec Co. Ltd., Hachinohe, Aomori (Japan); Marqueta, Alvaro; Nishiyama, Koichi [IFMIF/EVEDA Project Team, Rokkasho, Aomori (Japan); Sakaki, Hironao [Quantum Beam Science Center, JAEA, Kizu, Kyoto (Japan); Gobin, Raphael [Commissariat à l’Energie Atomique et aux Energies Alternatives, CEA/Saclay, DSM/IRFU, Gif/Yvette (France)

    2016-11-01

    Highlights: • Personnel Protection System (PPS) is developed to adapt the radiation licensing. • PPS achieves the target performance to secure the personnel safety. • Pulse Duty Management System (PDMS) is developed to manage the beam-operation-time. • Satisfying performance of PDMS is confirmed by injector operation with H+ beam. • By the result of PPS and PDMS tests, the radiation license was successfully obtained. - Abstract: The performance validation of the Linear IFMIF Prototype Accelerator (LIPAc), up to the energy of 9 MeV deuteron beam with 125 mA continuous wave (CW), is planned in Rokkasho, Japan. There are three main phases of LIPAc performance validation: Injector commissioning, RFQ commissioning and LIPAc commissioning. Injector commissioning was started by H{sup +} and D{sup +} beam. To apply the radiation licensing for the Injector commissioning, the entering/leaving to/from accelerator vault should be under control, and access to the accelerator vault has to be prohibited for any person during the beam operation. The Personnel Protection System (PPS) was developed to adapt the radiation licensing conditions. The licensing requests that PPS must manage the accumulated D{sup +} current. So, to manage the overall D{sup +} beam time during injector operation, Pulse Duty Management System (PDMS) was developed as a configurable subsystem as part of the PPS. The PDMS was tested during H{sup +} beam (as simulated D{sup +}) operation, to confirm that it can handle the beam inhibit from Injector before the beam accumulation is above the threshold value specified in the radiation licensing condition. In this paper, the design and configuration of these systems and the result of the tests are presented.

  20. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT III, MAINTAINING THE FUEL SYSTEM--DETROIT DIESEL ENGINE.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM. TOPICS ARE (1) PURPOSE OF THE FUEL SYSTEM, (2) TRACING THE FUEL FLOW, (3) MINOR COMPONENTS OF THE FUEL SYSTEM, (4) MAINTENANCE TIPS, (5) CONSTRUCTION AND FUNCTION OF THE FUEL INJECTORS, AND (6)…

  1. Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.

    Science.gov (United States)

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…

  2. Cinderella Gets an Invitation: recognising and organising systems maintenance and support

    Directory of Open Access Journals (Sweden)

    C. James Bacon

    1993-11-01

    Full Text Available Systems maintenance of existing systems is a 'Cinderella' subject in the field of information systems & technology (1ST. Although it accounts for the majority of systems work, the subject is generally neglected and taken for granted. Based on studies carried out in a large Australasian organisation, evidence is presented for recognising the strategic role of systems maintenance, as a complement to new development. Alternative means of organising systems development work is examined, with the conclusion that a separate systems support group for carrying out maintenance may have net advantage. A re-definition of maintenance, according to a taxonomy of eight different types, is proposed. Effective methodology and metrics for maintenance are also addressed, together with the general phenomenon of "entropological deterioration', and 12 factors that need to be used in assessing existing systems.

  3. Clustering of maintenance tasks for the danish railway system

    DEFF Research Database (Denmark)

    M. Pour, Shahrzad; Benlic, Una

    2017-01-01

    standards. In this paper, we present a mathematical model for allocation of maintenance tasks to maintenance team members, which is a variant of the Generalized Assignment Problem. The aim is to optimise the following three criteria: (i) the total distance travelled from depots to tasks, (ii) the maximal...... distance between any maintenance task and its allocated crew member, and (iii) the imbalance in workload among crew members. As test cases, we use a set of instances that simulate the distribution of tasks in the Jutland peninsula, the largest region of Denmark....

  4. System of maintenance of sustainability of oil pipelines

    International Nuclear Information System (INIS)

    Aleskerov, R.

    2005-01-01

    Full text : Development of the ecological science defining interrelation and interaction of system of an alive and lifeless matter, opens new opportunities and decisions of a problem of system maintenance of stability of oil pipelines and other engineering constructions and devices of strategic purpose. In work the methodology of system maintenance of stability of oil pipelines is resulted. It is known, that at transport of oil and gas a plenty of automatic and electronic devices, devices are applied to the control and the signal system of parameters of dangerous and harmful factors, a condition of the technological and test equipment, diagnostics and the control of pipelines. The control of parameters of safety of an oil pipeline over the operation, considering influence of heavy climatic conditions during all line, etc. (1, 2, 3) is carried out. Therefore stability of work of various parts of system of an oil pipeline depends on reliability and accuracy of work of devices and devices. However, thus influence of variations of geomagnetic fields and the geodynamic processes breaking the indications of devices and devices which lead to infringement reliability of all design of system of an oil pipeline is not considered. In turn, specified leads to failure, lost of human and natural resources. Now, according to the accepted methodology of a safety of working conditions, potential dangers of any activity, only person, with the subsequent development of measures of protection (4) are considered. Proceeding from it all surrounding material world shares on the following objects forming in aggregate working conditions: subjects of work.; means of production; products of work; the industrial environment; technology process; an environmental-climatic complex; fauna and flora; people (work of the person). Apparently from above resulted, in the accepted methodology potential dangers of any activity of the person and corresponding environmental -climatic conditions of the

  5. The Preventive Signaling Maintenance Crew Scheduling Problem for European Railway Traffic Management system (ERTMS)

    DEFF Research Database (Denmark)

    M. Pour, Shahrzad; Stidsen, Thomas Jacob Riis; Rasmussen, Kourosh Marjani

    , the western part of Denmark. This case is particularly interesting, since the entire railway signalling system is currently being upgraded to the new European Railway Traffic Management System (ERTMS) standard. The new signals need continuous maintenance and in this article we plan the distribution of crew......A railway system is a large and complex infrastructure, which requires continuous maintenance in order to function correctly. Proper maintenance is critical but can also be costly. In this paper we consider the practical case of planning the preventive maintenance of railway signals in Jutland...

  6. Computer interfacing of the unified systems for personnel supervising in nuclear units

    International Nuclear Information System (INIS)

    Staicu, M.

    1997-01-01

    The dosimetric supervising of the personnel working in nuclear units is based on the information supplied by: 1) the dosimetric data obtained by the method of thermoluminescence; 2) the dosimetric data obtained by the method of photo dosimetry: 3) the records from medical periodic control. To create a unified system of supervising the following elements were combined: a) an Automatic System of TLD Reading and Data Processing (SACDTL). The data from this system are transmitted 'on line' to the computer; b) the measuring line of the optical density of exposed dosimetric films. The interface achieved within the general ensemble SACDTL could be adapted to this line of measurement. The transmission of the data from the measurement line to the computer is made 'on line'; c) the medical surveillance data for each person transmitted 'off line' to the database computer. The unified system resulting from the unification of the three supervising systems will achieve the following general functions: - registering of the personnel working in the nuclear field; - recording the dosimetric data; - processing and presentation of the data; - issuing of measurement bulletins. Thus, by means of unified database, dosimetric intercomparison and correlative studies can be undertaken. (author)

  7. Design of preventive maintenance system using the reliability engineering and maintenance value stream mapping methods in PT. XYZ

    Science.gov (United States)

    Sembiring, N.; Panjaitan, N.; Angelita, S.

    2018-02-01

    PT. XYZ is a company owned by non-governmental organizations engaged in the field of production of rubber processing becoming crumb rubber. Part of the production is supported by some of machines and interacting equipment to achieve optimal productivity. Types of the machine that are used in the production process are Conveyor Breaker, Breaker, Rolling Pin, Hammer Mill, Mill Roll, Conveyor, Shredder Crumb, and Dryer. Maintenance system in PT. XYZ is corrective maintenance i.e. repairing or replacing the engine components after the crash on the machine. Replacement of engine components on corrective maintenance causes the machine to stop operating during the production process is in progress. The result is in the loss of production time due to the operator must replace the damaged engine components. The loss of production time can impact on the production targets which were not reached and lead to high loss costs. The cost for all components is Rp. 4.088.514.505. This cost is really high just for maintaining a Mill Roll Machine. Therefore PT. XYZ is needed to do preventive maintenance i.e. scheduling engine components and improving maintenance efficiency. The used methods are Reliability Engineering and Maintenance Value Stream Mapping (MVSM). The needed data in this research are the interval of time damage to engine components, opportunity cost, labor cost, component cost, corrective repair time, preventive repair time, Mean Time To Opportunity (MTTO), Mean Time To Repair (MTTR), and Mean Time To Yield (MTTY). In this research, the critical components of Mill Roll machine are Spier, Bushing, Bearing, Coupling and Roll. Determination of damage distribution, reliability, MTTF, cost of failure, cost of preventive, current state map, and future state map are done so that the replacement time for each critical component with the lowest maintenance cost and preparation of Standard Operation Procedure (SOP) are developed. For the critical component that has been

  8. Analysis of Millstone Unit 1 system failure and maintenance data

    International Nuclear Information System (INIS)

    Bickel, J.H.; Beveridge, R.L.; Jain, N.K.; Owens, D.B.; Radder, J.A.

    1985-01-01

    As a result of a task force plan developed four years ago at Northeast Utilities, plant-specific probabilistic safety analysis models are being developed for all Northeast Utilities operating nuclear plants. An essential feature of these models is their reliance on plant-specific reliability information to the maximum extent possible. This assures that future design efforts and decisions on backfitting or procedure changes are made with full knowledge of existing plant reliability. The use of plant-specific reliability data assures that the impacts of problem components are given appropriate attention and that proper credit is given for those components, which because of plant-specific maintenance practices, have exhibited better than industry average performance. A case study of a portion of the Millstone-1 cooling system demonstrates differing results obtained by fault tree analysis and a reliability analysis using plant-specific failure data. When risk assessment techniques are being applied in resource allocation, usage of plant data clearly becomes essential for sound decision making

  9. Maintenance system for immersed seals, specifically for nuclear reactors

    International Nuclear Information System (INIS)

    Poindexter, A.M.; Ricks, H.E.

    1977-01-01

    The invention concerns the immersed seals of nuclear reactors and specifically a maintenance system for the immersed seals of the revolving closing plugs of liquid metal breeder nuclear reactors. A liquid sodium immersed joint may be located at a given place or be surrounded by heating elements so that the sodium stays liquid whilst the reactor is working. In other cases, the sodium in the immersed seal is allowed to solidify whilst the reactor is working, thereby increasing the efficiency of the seal. At all events, the sodium must be in a liquid state during reloading with fuel to enable the plug to turn. The invention consists in fitting an ultrasonic transducer to the closure head of the reactor vessel so that the vibration emitting surface directs these vibrations towards the immersed seals so as to detach the deposits of impurities on them and ensure the wetting of the metal surfaces of which they are formed. Additionally, an envelope that can be placed around the ultrasonic transducer in conjunction with a suction appliance provides a mechanism through which the impurities can be removed from the area of the immersed seal [fr

  10. Bacteria with multipartite genome system, its maintenance and cell ...

    Indian Academy of Sciences (India)

    kullu

    bacterial genome maintenance and also contribute to higher stress tolerance and .... the molecular basis of genome partitioning would be different. ..... has resulted in the loss of infectivity and therefore, the use of this approach in the.

  11. Human Error Probability Assessment During Maintenance Activities of Marine Systems

    OpenAIRE

    Rabiul Islam; Faisal Khan; Rouzbeh Abbassi; Vikram Garaniya

    2018-01-01

    Background: Maintenance operations on-board ships are highly demanding. Maintenance operations are intensive activities requiring high man–machine interactions in challenging and evolving conditions. The evolving conditions are weather conditions, workplace temperature, ship motion, noise and vibration, and workload and stress. For example, extreme weather condition affects seafarers' performance, increasing the chances of error, and, consequently, can cause injuries or fatalities to personne...

  12. Control maintenance training program for special safety systems at Bruce B

    International Nuclear Information System (INIS)

    Reinwald, G.

    1997-01-01

    It was recognized from the early days of commissioning of Bruce B that Control Maintenance staff would require a level of expertise to be able to maintain Special Safety Systems in proper running order. In the early 80's this was achieved through hands on experience during the original commissioning, troubleshooting and placing of the various systems in service. Control maintenance procedures were developed and implemented as the new systems came available for commissioning, as were operating manuals,training manuals etc. Under the development of the Maintenance Manager, a Conduct of Maintenance section was organized. One of the responsibilities of this section was to develop a series of Maintenance Administrative Procedures (MAPs) that set the standards for maintenance activities including training

  13. Investigation of induced recirculation during planned ventilation system maintenance

    Science.gov (United States)

    Pritchard, C.J.; Scott, D.F.; Noll, J.D.; Voss, B.; Leonis, D.

    2015-01-01

    The Office of Mine Safety and Health Research (OMSHR) investigated ways to increase mine airflow to underground metal/nonmetal (M/NM) mine working areas to improve miners’ health and safety. One of those areas is controlled recirculation. Because the quantity of mine air often cannot be increased, reusing part of the ventilating air can be an effective alternative, if implemented properly, until the capacity of the present system is improved. The additional airflow can be used to provide effective dilution of contaminants and higher flow velocities in the underground mine environment. Most applications of controlled recirculation involve taking a portion of the return air and passing it back into the intake to increase the air volume delivered to the desired work areas. OMSHR investigated a Nevada gold mine where shaft rehabilitation was in progress and one of the two main fans was shut down to allow reduced air velocity for safe shaft work. Underground booster fan operating pressures were kept constant to maintain airflow to work areas, inducing controlled recirculation in one work zone. Investigation into system behavior and the effects of recirculation on the working area during times of reduced primary ventilation system airflow would provide additional information on implementation of controlled recirculation into the system and how these events affect M/NM ventilation systems. The National Institute for Occupational Safety and Health monitored the ventilation district when both main fans were operating and another scenario with one of the units turned off for maintenance. Airflow and contaminants were measured to determine the exposure effects of induced recirculation on miner health. Surveys showed that 19% controlled recirculation created no change in the overall district airflow distribution and a small reduction in district fresh air intake. Total dust levels increased only modestly and respirable dust levels were also low. Diesel particulate matter

  14. Two-stage maintenance of a production system with exponentially distributed on and off-periods

    NARCIS (Netherlands)

    van Dijkhuizen, G.C.; van Harten, Aart

    1998-01-01

    We consider an on–off production system which is subject to failure during on-periods. In case of a failure, the production system is maintained correctively. In addition, preventive maintenance is carried out to prevent failures. The costs of both preventive and corrective maintenance are modelled

  15. AUTOMOTIVE DIESEL MAINTENANCE, UNIT V, MAINTAINING THE LUBRICATION SYSTEM--DETROIT DIESEL ENGINE.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE LUBRICATION SYSTEM. TOPICS ARE LUBE OILS USED, MAINTENANCE OF THE LUBRICATION SYSTEM, AND CRANKCASE VENTILATION COMPONENTS. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILM "BASIC ENGINE…

  16. Reliability Centered Maintenance (RCM) Methodology and Application to the Shutdown Cooling System for APR-1400 Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Faragalla, Mohamed M.; Emmanuel, Efenji; Alhammadi, Ibrahim; Awwal, Arigi M.; Lee, Yong Kwan [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2016-10-15

    Shutdown Cooling System (SCS) is a safety-related system that is used in conjunction with the Main Steam and Main or Auxiliary Feedwater Systems to reduce the temperature of the Reactor Coolant System (RCS) in post shutdown periods from the hot shutdown operating temperature to the refueling temperature. In this paper RCM methodology is applied to (SCS). RCM analysis is performed based on evaluation of Failure Modes Effects and Criticality Analysis (FME and CA) on the component, system and plant. The Logic Tree Analysis (LTA) is used to determine the optimum maintenance tasks. The main objectives of RCM is the safety, preserve the System function, the cost-effective maintenance of the plant components and increase the reliability and availability value. The RCM methodology is useful for improving the equipment reliability by strengthening the management of equipment condition, and leads to a significant decrease in the number of periodical maintenance, extended maintenance cycle, longer useful life of equipment, and decrease in overall maintenance cost. It also focuses on the safety of the system by assigning criticality index to the various components and further selecting maintenance activities based on the risk of failure involved. Therefore, it can be said that RCM introduces a maintenance plan designed for maximum safety in an economical manner and making the system more reliable. For the SCP, increasing the number of condition monitoring tasks will improve the availability of the SCP. It is recommended to reduce the number of periodic maintenance activities.

  17. Optimization of series-parallel multi-state systems under maintenance policies

    International Nuclear Information System (INIS)

    Nourelfath, Mustapha; Ait-Kadi, Daoud

    2007-01-01

    In the redundancy optimization problem, the design goal is achieved by discrete choices made from components available in the market. In this paper, the problem is to find, under reliability constraints, the minimal cost configuration of a multi-state series-parallel system, which is subject to a specified maintenance policy. The number of maintenance teams is less than the number of repairable components, and a maintenance policy specifies the priorities between the system components. To take into account the dependencies resulting from the sharing of maintenance teams, the universal generating function approach is coupled with a Markov model. The resulting optimization approach has the advantage of being mainly analytical

  18. Issues of improving quality of training personnel for nuclear power facilities

    International Nuclear Information System (INIS)

    Jacko, J.

    1987-01-01

    The basic stages are characterized of the development of a standard system of personnel training for the start-up, operation and maintenance of nuclear power facilities. The experience is analyzed gained by the Branch Training Centre of the Nuclear Power Plant Research Institute. Suggestions are submitted for improving the quality of personnel training based on Czechoslovak and foreign experiences. (author). 3 refs

  19. PRM-based patterns for knowledge formalisation of industrial systems to support maintenance strategies assessment

    International Nuclear Information System (INIS)

    Medina-Oliva, G.; Weber, P.; Iung, B.

    2013-01-01

    The production system and its maintenance system must be now developed on “system thinking” paradigm in order to guarantee that Key Performance Indicators (KPI) will be optimized all along the production system (operation) life. In a recursive way, maintenance system engineering has to integrate also KPI considerations with regards to its own enabling systems. Thus this paper develops a system-based methodology wherein a set of KPIs is computed in order to verify if the objectives of the production and maintenance systems are satisfied. In order to help the decision-making process for maintenance managers, a “unified” generic model have been developed. This model integrates (a) the interactions of the maintenance system with its enabling systems, (b) the impact of the maintenance strategies through the computation of some key performance indicators, and (c) different kinds of knowledge regarding the maintenance system and the system of interest, including quantitative and qualitative knowledge. This methodology is based on an executable unified model built with Probabilistic Relational Model (PRM). PRM allows a modular representation and inferences computation of large size models. The methodology added-value is shown on a test-bench

  20. A framework to practical predictive maintenance modeling for multi-state systems

    International Nuclear Information System (INIS)

    Cher Ming Tan; Raghavan, Nagarajan

    2008-01-01

    A simple practical framework for predictive maintenance (PdM)-based scheduling of multi-state systems (MSS) is developed. The maintenance schedules are derived from a system-perspective using the failure times of the overall system as estimated from its performance degradation trends. The system analyzed in this work is a flow transmission water pipe system. The various factors influencing PdM-based scheduling are identified and their impact on the system reliability and performance are quantitatively studied. The estimated times to replacement of the MSS may also be derived from the developed model. The results of the model simulation demonstrate the significant impact of maintenance quality and the criteria for the call for maintenance (user demand) on the system reliability and mean performance characteristics. A slight improvement in maintenance quality is found to postpone the system replacement time by manifold. The consistency in the quality of maintenance work with minimal variance is also identified as a very important factor that enhances the system's future operational and downtime event predictability. The studies also reveal that in order to reduce the frequency of maintenance actions, it is necessary to lower the minimum user demand from the system if possible, ensuring at the same time that the system still performs its intended function effectively. The model proposed can be utilized to implement a PdM program in the industry with a few modifications to suit the individual industrial systems' needs

  1. A Multi-Objective Decision Support Model for the Turkish Armed Forces Personnel Assignment System

    National Research Council Canada - National Science Library

    Cimen, Zubeyir

    2001-01-01

    .... TAF wants to obtain maximum utilization of its personnel by assigning the right person to the right job at the right time, To accomplish this task, decision-makers and personnel assignment staff...

  2. Report: Management Alert - EPA Has Not Initiated Required Background Investigations for Information Systems Contractor Personnel

    Science.gov (United States)

    Report #17-P-0409, September 27, 2017. Not vetting contractor personnel before granting them network access exposes the EPA to risks. Contractor personnel with potentially questionable backgrounds who access sensitive agency data could cause harm.

  3. Maintenance Management Support Systems for component aging estimation at nuclear power plants

    International Nuclear Information System (INIS)

    Shimizu, Shunichi; Ando, Yasumasa; Morioka, Toshihiko; Okuzumi, Naoaki

    1991-01-01

    Maintenance Management Support Systems (MMSSs) for nuclear power plants have been developed using component aging estimation methods and decision tree analysis for maintenance planning. The former evaluates actual component reliability through statistical analysis on field maintenance data. The latter provides preventive maintenance (PM) planning guidance using heuristic expert knowledge and estimated reliability parameters. The following aspects have been investigated: (1) A systematic and effective method of managing components/parts design information and field maintenance data (2) A method for estimating component aging based on a statistical analysis of field maintenance data (3) A method for providing PM planning guidance using estimated component reliability/performance parameters and decision tree analysis. Based on these investigations, two MMSSs were developed. One deals with 'general maintenance data', which are common to all component types and are amenable to common data handling. The other system deals with 'specific maintenance data', which are specific to an individual component type. Both systems provide PM planning guidance for PM cycles propriety and the PM work priority. The function of these systems were verified using simulated maintenance data. (author)

  4. A decision support system for the maintenance of lights of traffic regulation systems

    NARCIS (Netherlands)

    Duyn Schouten, F.A. van der; Klusener, A.S.; Vlijmen, S.F.M. van; Vos de Wael, S.L.E.

    From October 1994 to June 1995 the authors executed a project, the so called 'Lampremplace' project, in cooperation with Nederland Haarlem, a Dutch constructor and supplier of traffic regulation systems. 'Lampremplace', as it is called in traffic jargon, is the maintenance of lights of traffic

  5. Design of an artificial intelligence system for safety function maintenance

    International Nuclear Information System (INIS)

    Sharma, D.D.; Miller, D.W.; Chandrasekaran, B.

    1985-01-01

    The safety function (SF) maintenance concept provides a systematic approach to mitigate the consequences of an unforeseen event. Safety functions are a set of actions for mitigating or limiting consequences of a safety threatening event. The current approach to SF maintenance of selecting a success path (SP) from a library of predefined SPs is inadequate because it includes only anticipated modes of challenging an SF. To cover all possible modes of challenging an SF, the library of success paths would be extremely large and difficult to implement on any existing computer. In this paper the authors describe a method based on artificial intelligence (AI) theory of planning to synthesize an SP using available resources to satisfy a hierarchy of safety goals. The method has been applied to SF maintenance of a boiling water reactor (BWR) using data from the Perry nuclear power plant

  6. An informatics system for training, examination and knowledge evaluation of the FHS personnel

    International Nuclear Information System (INIS)

    Pantilie, E.; Marinescu, N.

    2016-01-01

    The paper presents the way to implement a Fuel Handling System (FHS) data base in order to carry out an informatic system for training, examination and knowledge evaluation. The sessions, are organized as ''ebooks'' represent a way of modern learning and thoroughness, examination and assessment of the professional knowledge. The use of these lessons for personnel training, working in the FHS area, leads both to the increase of the learning quality and reduction of the time for studying activities. The student is getting the advanced professional knowledge regarding the technological equipment operation by graduating the session. This e-learning system is designed and used to keep and develop, in time, deep in knowledge, about Fuelling Machine Head construction and working, for F/M Test Rig operators and technicians, from INR Pite.ti. The e-lessons for F/M snout clamp, magazine and separators have been already implemented, the rest of materials in data base is following. (authors)

  7. Optimal maintenance policy for a system subject to damage in a discrete time process

    International Nuclear Information System (INIS)

    Chien, Yu-Hung; Sheu, Shey-Huei; Zhang, Zhe George

    2012-01-01

    Consider a system operating over n discrete time periods (n=1, 2, …). Each operation period causes a random amount of damage to the system which accumulates over time periods. The system fails when the cumulative damage exceeds a failure level ζ and a corrective maintenance (CM) action is immediately taken. To prevent such a failure, a preventive maintenance (PM) may be performed. In an operation period without a CM or PM, a regular maintenance (RM) is conducted at the end of that period to maintain the operation of the system. We propose a maintenance policy which prescribes a PM when the accumulated damage exceeds a pre-specified level δ ( ⁎ and N ⁎ and discuss some useful properties about them. It has been shown that a δ-based PM outperforms a N-based PM in terms of cost minimization. Numerical examples are presented to demonstrate the optimization of this class of maintenance policies.

  8. Online maintenance policy for a deteriorating system with random change of mode

    Energy Technology Data Exchange (ETDEWEB)

    Saassouh, B. [Laboratoire de Modelisation et Surete des Systemes, Institut Charles Delaunay-FRE CNRS 2848, Universite de Technologie de Troyes, 12, rue Marie Curie-BP 2060, 10010 Troyes Cedex (France); Dieulle, L. [Laboratoire de Modelisation et Surete des Systemes, Institut Charles Delaunay-FRE CNRS 2848, Universite de Technologie de Troyes, 12, rue Marie Curie-BP 2060, 10010 Troyes Cedex (France); Grall, A. [Laboratoire de Modelisation et Surete des Systemes, Institut Charles Delaunay-FRE CNRS 2848, Universite de Technologie de Troyes, 12, rue Marie Curie-BP 2060, 10010 Troyes Cedex (France)]. E-mail: antoine.grall@utt.fr

    2007-12-15

    Most of maintenance policies proposed in the literature for gradually deteriorating systems, consider a stationary deterioration process. This paper is an attempt to take into account stochastically deteriorating systems which are subject to a sudden change in their degradation process. A technical device subject to gradual degradation is considered. It is assumed that the level of degradation can be resumed by a single scalar variable. An online maintenance decision rule is proposed, which makes it possible to take into account in real time the online information available on the operating mode of the system as well as its actual deterioration level. We show the efficiency of considering online decision rules for maintenance with respect to traditional maintenance policies based on a static alarm threshold. Numerical simulations are given, to assess and optimize the performance of the maintained system from its asymptotic unavailability point of view. It is compared to the results obtained with classical control-limit maintenance policies.

  9. A condition-based maintenance policy for multi-component systems with Lévy copulas dependence

    International Nuclear Information System (INIS)

    Li, Heping; Deloux, Estelle; Dieulle, Laurence

    2016-01-01

    In this paper, we propose a new condition-based maintenance policy for multi-component systems taking into account stochastic and economic dependences. The stochastic dependence between components due to common environment is modelled by Lévy copulas. Its influence on the maintenance optimization is investigated with different dependence degrees. On the issue of economic dependence providing opportunities to group maintenance activities, a new maintenance decision rule is proposed which permits maintenance grouping. In order to evaluate the performance of the proposed maintenance policy, we compare it to the classical maintenance policies. - Highlights: • A new adaptive maintenance policy for grouping maintenance actions is proposed. • The impacts of both economic and stochastic dependences are investigated. • The performance of the proposed maintenance policy is evaluated under different system configurations. • The stochastic dependence is modelled by Lévy copulas. • The proposed maintenance decision rule can take full advantage of economic and stochastic dependences.

  10. Developing Mobile- and BIM-Based Integrated Visual Facility Maintenance Management System

    Directory of Open Access Journals (Sweden)

    Yu-Cheng Lin

    2013-01-01

    Full Text Available Facility maintenance management (FMM has become an important topic for research on the operation phase of the construction life cycle. Managing FMM effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building information modeling (BIM uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This paper proposes a new and practical methodology with application to FMM using BIM technology. Using BIM technology, this study proposes a BIM-based facility maintenance management (BIMFMM system for maintenance staff in the operation and maintenance phase. The BIMFMM system is then applied in selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FMM practice. Using the BIMFMM system, maintenance staff can access and review 3D BIM models for updating related maintenance records in a digital format. Moreover, this study presents a generic system architecture and its implementation. The combined results demonstrate that a BIMFMM-like system can be an effective visual FMM tool.

  11. Engine health monitoring systems: Tools for improved maintenance management in the 1980's

    Science.gov (United States)

    Kimball, J. C.

    1981-01-01

    The performance monitoring aspect of maintenance, characteristic of the engine health monitoring system are discussed. An overview of the system activities is presented and a summary of programs for improved monitoring in the 1980's are discussed.

  12. Application of tape unit in data acquisition system and its maintenance and trouble shoot

    International Nuclear Information System (INIS)

    Xing Jianping; Qian Xicheng

    1995-01-01

    Application of magnetic tape unit in data acquisition system of DEC computer imported from German and its maintenance as well as trouble shoot is described. The system is used for nuclear data acquisition and processing

  13. Effective computing algorithm for maintenance optimization of highly reliable systems

    Czech Academy of Sciences Publication Activity Database

    Briš, R.; Byczanski, Petr

    2013-01-01

    Roč. 109, č. 1 (2013), s. 77-85 ISSN 0951-8320 R&D Projects: GA MŠk(CZ) ED1.1.00/02.0070 Institutional support: RVO:68145535 Keywords : exact computing * maintenance * optimization * unavailability Subject RIV: BA - General Mathematics Impact factor: 2.048, year: 2013 http://www.sciencedirect.com/science/article/pii/S0951832012001639

  14. Preliminary conceptual design of inspection and maintenance for KALIMER reactor system

    Energy Technology Data Exchange (ETDEWEB)

    Joo, Young Sang; Kim, Seok Hun; Yoo, Bong

    2000-08-01

    In-service inspection and maintenance are very important for improving the safety and availability of nuclear power plants. The conceptual requirements of in-service inspection and maintenance should be reflected in the earlier design process for the verification of the plant operability and reliability. In this report the fundamental approaches of the inspection and maintenance for KALIMER are established to ensure the structural integrity and operability for KALIMER. The general strategy and methodology of maintenance and inspection for the reactor system and components are proposed and described for satisfying the intents of the section XI, division 3, of ASME code and considering the design characteristics of KALIMER.

  15. Risk-Based Predictive Maintenance for Safety-Critical Systems by Using Probabilistic Inference

    Directory of Open Access Journals (Sweden)

    Tianhua Xu

    2013-01-01

    Full Text Available Risk-based maintenance (RBM aims to improve maintenance planning and decision making by reducing the probability and consequences of failure of equipment. A new predictive maintenance strategy that integrates dynamic evolution model and risk assessment is proposed which can be used to calculate the optimal maintenance time with minimal cost and safety constraints. The dynamic evolution model provides qualified risks by using probabilistic inference with bucket elimination and gives the prospective degradation trend of a complex system. Based on the degradation trend, an optimal maintenance time can be determined by minimizing the expected maintenance cost per time unit. The effectiveness of the proposed method is validated and demonstrated by a collision accident of high-speed trains with obstacles in the presence of safety and cost constrains.

  16. Control systems, personnel policies and management initiatives to limit pollution incidents

    International Nuclear Information System (INIS)

    Martin, B.F.

    1991-01-01

    After the regulatory requirements are met, an important collateral step in the continuing Hazardous Waste/Environmental Management cycle of activities is to minimize the possibility of a pollution incident, spill, contamination, mislabeling, mishandling or exposure, since this minimizes a major contingent liability of the company. Human failure accounts for 88% of accidents, 10% occur from mechanical failure and only 2% are unpreventable force majeure. This implies that fully 98% of all accidents can be prevented or minimized. Good engineering, production, management and educational practices can be formulated to minimize the occurrence and effects of accidental pollution incidents. Hazardous Material/Environmental Management tends to focus on technical and regulatory objectives, a reactionary mode caused in part by the rapidly changing regulatory environment and the need to continually adapt to these changes. Management functions such as personnel management and situational management get shortchanged in research and in practice. What is needed is a system that incorporates change readily, adapts personnel to change easily and mobilizes all the human resources of a company in meeting environmental and regulatory goals in the same way other goals of the company are met. Feedback Loop/Control System concepts have been applied to management practice in the popular Management By Objectives School as well as other schools of management practice. An Environmental Management program is proposed which incorporates feedback loop/ control systems to facilitate operations and training objectives and requirements. By incorporating Environmental and Hazardous Waste goals with other management goals in a system involving all levels of management and workers on the same team, the proposed system will reduce the probability of accidental pollution incidents and thus the contingent liability of a spill or other incident

  17. An integrated production, inventory and preventive maintenance model for a multi-product production system

    International Nuclear Information System (INIS)

    Liu, Xuejuan; Wang, Wenbin; Peng, Rui

    2015-01-01

    This paper considers a production system that can produce multiple products alternately. Products go through the system in a sequence and a complete run of all products forms a production cycle. An integrated production, inventory and preventive maintenance model is constructed, which is characterized by the delay-time concept. Two different situations are studied based on whether the unqualified products and downtime caused by the failures of the system, set-up and preventive maintenance can be ignored or not. Three cases are considered for each situation, depending on the position of the preventive maintenance epochs: the first case, where preventive maintenance is carried out at the end of each production cycle; the second case, where preventive maintenance is carried out at each set-up time of the products; and the third case, where preventive maintenance is carried out at some set-up times only, since it may not always be optimal to carry out preventive maintenance at the end of the production cycle or at each set-up time. The modeling objectives are to find the optimal number of production cycles per year and the optimal position of preventive maintenance that will maximize the expected profit per unit time. Numerical examples, using real data, are presented to illustrate the model. - Highlights: • We propose an integrated economic production quantity and preventive maintenance model. • The situation that multiple products are produced on the same system alternately is studied. • Two situations are studied based on whether the downtime and the product quality can be ignored or not. • We use enumeration method and analytical method to select the optimal preventive maintenance policy, respectively. • We use the delay-time concept to model the preventive maintenance policy

  18. Round Robin Test for Performance Demonstration System of Ultrasound Examination Personnel in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kim, Young Ho; Yang, Seung Han; Kim, Yong Sik; Yoon, Byung Sik; Lee, Hee Jong

    2005-01-01

    Ultrasound testing performance during in-service inspection for the main components of NPPs is strongly affected by each examination person. Therefore, ASME established a more strict qualification requirement in Sec. XI Appendix VIII for the ultrasound testing personnel in nuclear power plants. The Korean Performance Demonstration (KPD) System according to the ASME code for the ultrasonic testing personnel, equipments, and procedures to apply to the Class 1 and 2 piping ultrasound examination of nuclear power plants in Korea was established. And a round robin test was conducted in order to verify the effectiveness of PD method by comparing the examination results from the method of Performance Demonstration (PD) and a traditional ASME code dB-drop method. The round robin test shows that the reliability of the PD method is better than that of the dB-drop method. As a result, application of the PD method to the in-service inspection of the nuclear power plants will improve the performance of ultrasound testing

  19. Angular response characterization of the Martin Marietta Energy Systems, Inc., personnel dosimeter

    International Nuclear Information System (INIS)

    Ahmed, A.B.; McMahan, K.L.; Colwell, D.S.

    1993-08-01

    An evaluation of the Martin Marietta Energy Systems, Inc., personnel dosimeter to radiation incident from non-perpendicular angles was carried out to meet the Department of Energy Laboratory Accreditation Program (DOELAP) requirements. Dosimeters were exposed to six different radiation sources. For each source, dosimeters were rotated about their horizontal and vertical axes at seven different angles each. Raw readings were processed through the dose calculation algorithm used for routine personnel dosimetry to determine dose equivalent values. Dose equivalent responses relative to zero degree incident angle were found to be within ± 20% for M150, K-59 and 137 Cs photons when the incident angle was 60 degree or less. For low-energy photon irradiations (M30 and K-16), responses for angles other than perpendicular incidence are generally unpredictable. Reasons include: (1) failure of dose calculation algorithm to identify the radiation field correctly due to unusual element ratios; and (2) at extreme angles (± 85 degree), the dosimeter design (in relation to the irradiation geometry) becomes the limiting factor in producing reproducible results. Response to 204 Tl beta particles decreases rapidly with increasing angle of incidence

  20. Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling - abstract

    Science.gov (United States)

    As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...

  1. An effective approach to reducing strategy space for maintenance optimisation of multistate series–parallel systems

    International Nuclear Information System (INIS)

    Zhou, Yifan; Lin, Tian Ran; Sun, Yong; Bian, Yangqing; Ma, Lin

    2015-01-01

    Maintenance optimisation of series–parallel systems is a research topic of practical significance. Nevertheless, a cost-effective maintenance strategy is difficult to obtain due to the large strategy space for maintenance optimisation of such systems. The heuristic algorithm is often employed to deal with this problem. However, the solution obtained by the heuristic algorithm is not always the global optimum and the algorithm itself can be very time consuming. An alternative method based on linear programming is thus developed in this paper to overcome such difficulties by reducing strategy space of maintenance optimisation. A theoretical proof is provided in the paper to verify that the proposed method is at least as effective as the existing methods for strategy space reduction. Numerical examples for maintenance optimisation of series–parallel systems having multistate components and considering both economic dependence among components and multiple-level imperfect maintenance are also presented. The simulation results confirm that the proposed method is more effective than the existing methods in removing inappropriate maintenance strategies of multistate series–parallel systems. - Highlights: • A new method using linear programming is developed to reduce the strategy space. • The effectiveness of the new method for strategy reduction is theoretically proved. • Imperfect maintenance and economic dependence are considered during optimisation

  2. Selective maintenance for multi-state series–parallel systems under economic dependence

    International Nuclear Information System (INIS)

    Dao, Cuong D.; Zuo, Ming J.; Pandey, Mayank

    2014-01-01

    This paper presents a study on selective maintenance for multi-state series–parallel systems with economically dependent components. In the selective maintenance problem, the maintenance manager has to decide which components should receive maintenance activities within a finite break between missions. All the system reliabilities in the next operating mission, the available budget and the maintenance time for each component from its current state to a higher state are taken into account in the optimization models. In addition, the components in series–parallel systems are considered to be economically dependent. Time and cost savings will be achieved when several components are simultaneously repaired in a selective maintenance strategy. As the number of repaired components increases, the saved time and cost will also increase due to the share of setting up between components and another additional reduction amount resulting from the repair of multiple identical components. Different optimization models are derived to find the best maintenance strategy for multi-state series–parallel systems. A genetic algorithm is used to solve the optimization models. The decision makers may select different components to be repaired to different working states based on the maintenance objective, resource availabilities and how dependent the repair time and cost of each component are

  3. 49 CFR 180.416 - Discharge system inspection and maintenance program for cargo tanks transporting liquefied...

    Science.gov (United States)

    2010-10-01

    ... section. (v) Stainless steel flexible connectors with damaged reinforcement braid. (vi) Internal self... program for cargo tanks transporting liquefied compressed gases. 180.416 Section 180.416 Transportation... PACKAGINGS Qualification and Maintenance of Cargo Tanks § 180.416 Discharge system inspection and maintenance...

  4. Concept for a vertical maintenance remote handling system for multi module blanket segments in DEMO

    International Nuclear Information System (INIS)

    Coleman, M.; Sykes, N.; Cooper, D.; Iglesias, D.; Bastow, R.; Loving, A.; Harman, J.

    2014-01-01

    Highlights: •A conceptual architectural model for a vertical maintenance DEMO is presented. •Novel concepts for a set of DEMO remote handling equipment are put forward. •Remote maintenance of a multi module segment blanket is found to be feasible. •The criticality of space in the vertical port is highlighted. -- Abstract: The anticipated high neutron flux, and the consequent damage to plasma-facing components in DEMO, results in the need to regularly replace the tritium breeding and radiation shielding blanket. The current European multi module segment (MMS) blanket concept favours a less invasive small port entry maintenance system over large sector transport concepts, because of the reduced impact on other tokamak systems – particularly the magnetic coils. This paper presents a novel conceptual remote maintenance strategy for a Vertical Maintenance Scheme DEMO, incorporating substantiated designs for an in-vessel mover, to detach and attach the blanket segments, and cask-housed vertical maintenance devices to open and close access ports, cut and join service connections, and extract blanket segments from the vessel. In addition, a conceptual architectural model for DEMO was generated to capture functional and spatial interfaces between the remote maintenance equipment and other systems. Areas of further study are identified in order to comprehensively establish the feasibility of the proposed maintenance system

  5. The data collection system for failure/maintenance at the Tritium Systems Test Assembly

    International Nuclear Information System (INIS)

    Casey, M.A.; Gruetzmacher, K.M.; Bartlit, J.R.; Cadwallader, L.C.

    1988-01-01

    A data collection system for obtaining information which can be used to help determine the reliability and vailability of future fusion power plants has been installed at the Los Alamos National Laboratory's Tritium Systems Test Assembly (TSTA). Failure and maintenance data on components of TSTA's tritium systems have been collected since 1984. The focus of the data collection has been TSTA's Tritium Waste Tratment System (TWT), which has maintained high availability since it became operation in 1982. Data collection is still in progress and a total of 291 failure reports are in the data collection system at this time, 47 of which are from the TWT. 6 refs., 2 figs., 2 tabs

  6. Performance comparisons of selected personnel-dosimetry systems in use at Department of Energy facilities

    International Nuclear Information System (INIS)

    Roberson, P.L; Holbrook, K.L.; Yoder, R.C.; Fox, R.A.; Hadley, R.T.; Hogan, B.T.; Hooker, C.D.

    1983-10-01

    Dosimeter performance data were collected to help develop a uniform approach to the calibration and use of personnel dosimetry systems for Department of Energy (DOE) laboratories. Eleven DOE laboratories participated in six months of testing using the American National Draft Standard, Criteria for Testing Personnel Dosimetry Performance, ANSI N13.11, and additional testing categories. The tests described in ANSI N13.11 used a pass/fail system to determine compliance with the draft standard. Recalculation to PNL irradiations showed that the 137 Cs, 90 Sr/ 90 Y, and 252 Cf categories can be recalibrated to have acceptable performance for nearly all participant systems. Deficient dosimeter design or handling techniques caused poor performance in the x-ray category for nearly half of the participants. Too little filtration for the deep-dose element caused poor performance in the beta/photon mixture category for one participant. Two participants had excessively high standard deviations in the neutron category due to dosimeter design or handling deficiencies. The participating dosimetry systems were separated into three categories on their dose evaluation procedure for low-energy photons. These were film dosimeters, fixed-calibration thermoluminescent (TL) dosimeters, and variable-calibration TL dosimeters. The performance of the variable-calibration design was best while the film dosimeters performed considerably worse than either TL dosimeter design. Beta energy dependence studies confirmed a strong correlation between sensitive element thickness, shallow element filtration and low-energy beta response. Studies of neutron calibration conditions for each participant suggested a relationship between response and calibration facility design

  7. Maintenance Management Systems in the Czech Enterprises of Chemical and Food Industries

    Directory of Open Access Journals (Sweden)

    Lenka Branska

    2016-12-01

    Full Text Available Purpose of the article: The aim of this article is to use the results of the qualitative research to describe the current form of maintenance systems used in enterprises of chemical and food industries, and then to discuss and generalize the results. Methodology/methods: The primary qualitative research was conducted in five companies, which can be regarded as typical representatives of the industries. The main objective of the primary research in individual companies was to determine how they perform the strategic and tactical operational planning of maintenance, implementation of these plans and their control. Individual interviews with respondents were used as the research method. The results of the research were processed using the content analysis method. Subsequently, comparison of the findings from individual businesses and subsequent synthesis thereof was performed, which allowed making generalizations. Scientific aim: The scientific aim of the article is to develop knowledge in the field of maintenance management by specifying the form of the maintenance systems utilized in Czech enterprises of the chemical and food industries and identifying the main opportunities for their improvement. Findings: Czech enterprises of the chemical and food industries utilize maintenance management systems. These systems are aimed at prevention, emphasizing the planning of maintenance activities in fixed periodic intervals. Also, they often utilize diagnostic maintenance. However, the maintenance systems currently used cannot be considered fully operational, with regard to the relatively large volume of after-failure repairs. Conclusions: Production equipment maintenance systems are irreplaceable in chemical and food industry enterprises, but there is great potential for improvement. Improvement should be focused on the area of strategic as well as tactical and operational planning of production equipment maintenance. In terms of strategy, the biggest

  8. Preventive maintenance optimization for a multi-component system under changing job shop schedule

    International Nuclear Information System (INIS)

    Zhou Xiaojun; Lu Zhiqiang; Xi Lifeng

    2012-01-01

    Variability and small lot size is a common feature for many discrete manufacturing processes designed to meet a wide array of customer needs. Because of this, job shop schedule often has to be continuously updated in reaction to changes in production plan. Generally, the aim of preventive maintenance is to ensure production effectiveness and therefore the preventive maintenance models must have the ability to be adaptive to changes in job shop schedule. In this paper, a dynamic opportunistic preventive maintenance model is developed for a multi-component system with considering changes in job shop schedule. Whenever a job is completed, preventive maintenance opportunities arise for all the components in the system. An optimal maintenance practice is dynamically determined by maximizing the short-term cumulative opportunistic maintenance cost savings for the system. The numerical example shows that the scheme obtained by the proposed model can effectively address the preventive maintenance scheduling problem caused by the changes in job shop schedule and is more efficient than the ones based on two other commonly used preventive maintenance models.

  9. The state-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-01-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system

  10. Analytical method for optimization of maintenance policy based on available system failure data

    International Nuclear Information System (INIS)

    Coria, V.H.; Maximov, S.; Rivas-Dávalos, F.; Melchor, C.L.; Guardado, J.L.

    2015-01-01

    An analytical optimization method for preventive maintenance (PM) policy with minimal repair at failure, periodic maintenance, and replacement is proposed for systems with historical failure time data influenced by a current PM policy. The method includes a new imperfect PM model based on Weibull distribution and incorporates the current maintenance interval T 0 and the optimal maintenance interval T to be found. The Weibull parameters are analytically estimated using maximum likelihood estimation. Based on this model, the optimal number of PM and the optimal maintenance interval for minimizing the expected cost over an infinite time horizon are also analytically determined. A number of examples are presented involving different failure time data and current maintenance intervals to analyze how the proposed analytical optimization method for periodic PM policy performances in response to changes in the distribution of the failure data and the current maintenance interval. - Highlights: • An analytical optimization method for preventive maintenance (PM) policy is proposed. • A new imperfect PM model is developed. • The Weibull parameters are analytically estimated using maximum likelihood. • The optimal maintenance interval and number of PM are also analytically determined. • The model is validated by several numerical examples

  11. Application of genetic algorithms to the maintenance scheduling optimization in a nuclear system basing on reliability

    International Nuclear Information System (INIS)

    Lapa, Celso M. Franklin; Pereira, Claudio M.N.A.; Mol, Antonio C. de Abreu

    1999-01-01

    This paper presents a solution based on genetic algorithm and probabilistic safety analysis that can be applied in the optimization of the preventive maintenance politic of nuclear power plant safety systems. The goal of this approach is to improve the average availability of the system through the optimization of the preventive maintenance scheduling politic. The auxiliary feed water system of a two loops pressurized water reactor is used as a sample case, in order to demonstrate the effectiveness of the proposed method. The results, when compared to those obtained by some standard maintenance politics, reveal quantitative gains and operational safety levels. (author)

  12. Dataset Documentation for the ERTMS-Oriented Signalling Maintenance in the Danish Railway System

    DEFF Research Database (Denmark)

    M. Pour, Shahrzad

    2017-01-01

    This documentation provides information about the dataset generated as part of a PhD thesis (Towards Signalling Maintenance Scheduling Problem for European Railway Traffic Management System ) for the signaling maintenance of the Danish railway system . The data instances (M.Pour 2018a; M.Pour 2018b......) have been created for the purpose of adaptation to the newest railway signalling standard which is so called European Railway Traffic Management System(ERTMS). The chapter provides explanation of the different types of maintenance tasks in the ERTMS, followed by data definition. Furthermore...

  13. Management practice and innovation in digital I and C system maintenance of nuclear power plant

    International Nuclear Information System (INIS)

    Huang Qian; Shi Qingwei; Huang Yaning

    2012-01-01

    This essay introduces the application situation of new ideas and methods in aspects of risk analysis, equipment status monitoring, defect tracing and maintenance management network in the course of maintaining the digital I and C system of Tianwan Nuclear Power Station, gives a detail description about the enhancement of the enterprise culture and scientific innovation in the field of digital I and C system maintenance. The practices in the past several years show that the management practice and the innovation means in the field of digital I and C system maintenance of Tianwan Nuclear Power Station are effective, and can provide reference for the other projects in this regard. (authors)

  14. Application of robotic systems to nuclear power plant maintenance tasks

    International Nuclear Information System (INIS)

    Kok, K.D.; Bartilson, B.M.; Rosen, K.L.; Renner, G.F.; Law, T.M.

    1984-01-01

    Robotics technology has developed to where it can provide consistent performance of well-defined tasks. Although nuclear power plant maintenance tasks are characteristically unique, there are some common subtasks which have the consistency required for robots. Several maintenance activities were selected for further study. Concepts for robotic devices and rough scenarios for their use were developed and analyzed for their effect on maintenance costs. The results of the analysis, which was performed using a 10-year life and conservative estimates and procedures, indicate cost savings ranging from $100,000 to $1.5 M in net present value per robot. Projected purchase prices for the robots were less than $200,000. Although the robot concepts used commercially available technology, they are unlike any products either in use or widely required. Robot manufacturers are concentrating on mainstream applications in production, and are unlikely to develop such specialized products. The potential for cost savings indicates that developments should be funded by the nuclear industry

  15. Personnel monitoring

    International Nuclear Information System (INIS)

    1965-01-01

    This film stresses the need for personnel monitoring in work areas where there is a hazard of exposure to radiation. It illustrates the use of personnel monitoring devices (specially the film dosimeter), the assessment of exposure to radiation and the detailed recording of the results on personnel filing cards

  16. Personnel monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1966-12-31

    This film stresses the need for personnel monitoring in work areas where there is a hazard of exposure to radiation. It illustrates the use of personnel monitoring devices (specially the film dosimeter), the assessment of exposure to radiation and the detailed recording of the results on personnel filing cards

  17. Application of condition based maintenance to nuclear power plants

    International Nuclear Information System (INIS)

    Sonoda, Yukio; Nakano, Tomohito; Shimizu, Shunichi; Iida, Jun; Atomura, Masakazu; Abe, Masahiro

    2002-01-01

    Device Karte management system which supports application of condition based maintenance to nuclear power plants has been developed. The purpose of this system is to support maintenance personnel in device inspection scheduling based on operating condition monitoring and maintenance histories. There are four functions: field database, degradation estimation, inspection time decision and maintenance planning. The authors have been applying this system to dozens of devices of Onagawa Nuclear Power Station Unit No. 1 for one year. This paper represents the system concept and its application experiences. (author)

  18. Case Study on the Unavailability of a Ship Propulsion System under Aging Effects and Maintenance

    OpenAIRE

    Tadatsugi Okazaki

    2016-01-01

    Unavailability of a ship propulsion system under aging effects and proper maintenance is estimated using GO-FLOW. GO-FLOW is an effective software tool for the unavailability analysis of complex systems. Aging effects are incorporated into GO-FLOW using a time-dependent technique and assuming a linear aging model. The results show that the aging effects and improper maintenance can potentially increase the frequency of accidents due to a malfunction of the propulsion system by a factor of three.

  19. Basic Concept and Theoretical Study of Condition-based Maintenance for Power Transmission System

    Institute of Scientific and Technical Information of China (English)

    LIMing; HAN Xueshan; YANG Ming; GUO Zhihong

    2011-01-01

    The appropriate maintenance time for the single equipment can be found easily and efficiently under the background of condition-based maintenance. However, from the perspective of the whole power system, discrepancy between equipment individual and the whole power system would appear. Once this discrepancy can not be coordinated, it will certainly cause contradiction and conflict between individual equipment and the whole system, and lose the integral efficiency. To solve this contradiction and conflicts is of significant meaning.

  20. Maintenance Optimization Schedulingof Electric Power SystemsConsidering Renewable EnergySources

    OpenAIRE

    Yu, Jia

    2015-01-01

    Maintenance is crucial in any industry to keep components in a reasonable functionalcondition, especially in electric power system, where maintenance is done so that thefrequency and the duration of a fault can be shortened, thus increasing the availability of acertain component. And the reliability of the whole electric power system can also beimproved. In the many deregulated electricity markets, reliability and economic drivingforces are the two aspects that system operators mainly conside...

  1. Tokamak Fusion Core Experiment (TFCX) special-purpose remote maintenance systems

    International Nuclear Information System (INIS)

    Masson, L.S.; Welland, H.J.

    1985-01-01

    A key element in the preconceptual design of the Tokamak Fusion Core Experiment (TFCX) was the development of design concepts for special-purpose remote maintenance systems. Included were systems for shield sector replacement, vacuum vessel sector and toroidal field coil replacement, limiter blade replacement, protective tile replacement, and general-purpose maintenance. This paper addresses these systems as they apply to the copper toroidal field (TF) coil version of the TFCX

  2. Operation and maintenance manual for septic holding tank system for project W-519, two double-wide construction support trailers

    International Nuclear Information System (INIS)

    MORTIMER, C.S.

    1999-01-01

    This manual was prepared to provide detailed information for the operation and maintenance of the sanitary wastewater holding system. It sets forth system operation and maintenance as well as failure response procedures

  3. Expert system for maintenance management of a boiling water reactor power plant

    International Nuclear Information System (INIS)

    Hong Shen; Liou, L.W.; Levine, S.; Ray, A.; Detamore, M.

    1992-01-01

    An expert system code has been developed for the maintenance of two boiling water reactor units in Berwick, Pennsylvania, that are operated by the Pennsylvania Power and Light Company (PP and L). The objective of this expert system code, where the knowledge of experienced operators and engineers is captured and implemented, is to support the decisions regarding which components can be safely and reliably removed from service for maintenance. It can also serve as a query-answering facility for checking the plant system status and for training purposes. The operating and maintenance information of a large number of support systems, which must be available for emergencies and/or in the event of an accident, is stored in the data base of the code. It identifies the relevant technical specifications and management rules for shutting down any one of the systems or removing a component from service to support maintenance. Because of the complexity and time needed to incorporate a large number of systems and their components, the first phase of the expert system develops a prototype code, which includes only the reactor core isolation coolant system, the high-pressure core injection system, the instrument air system, the service water system, and the plant electrical system. The next phase is scheduled to expand the code to include all other systems. This paper summarizes the prototype code and the design concept of the complete expert system code for maintenance management of all plant systems and components

  4. Optimization of the preventive maintenance plan of a series components system

    Energy Technology Data Exchange (ETDEWEB)

    Duarte, Jose A. Caldeira [Mathematical Department, Instituto Politecnico de Setubal/Escola Superior de Tecnologia de Setubal, Campus do IPS, Estefanilha, 2914-508 Setubal (Portugal)]. E-mail: jduarte@est.ips.pt; Craveiro, Joao C. Taborda A. [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal); Trigo, Tomas Pedro [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal)

    2006-04-15

    One of the most critical problems in preventive maintenance is the determination of the optimum frequency to perform preventive maintenance in equipment, in order to ensure its availability. In this paper, we propose an algorithm to solve the previous problem for equipment that exhibit linearly increasing hazard rate and constant repair rate. Based on this algorithm, we have developed another one to solve the problem of maintenance management of a series system based on preventive maintenance over the different system components. We assume that all components of the system still exhibit linearly increasing hazard rate and constant repair rate and that preventive maintenance would bring the system to the as good as new condition. We define a cost function for maintenance tasks (preventive and corrective) for the system. The algorithm calculates the interval of time between preventive maintenance actions for each component, minimizing the costs, and in such a way that the total downtime, in a certain period of time, does not exceed a predetermined value.

  5. Open system architecture for condition based maintenance applied to a hydroelectric power plant

    Energy Technology Data Exchange (ETDEWEB)

    Amaya, E.J.; Alvares, A.J. [University of Brasilia (UnB), DF (Brazil). Mechanical and Mechatronic Dept.], Emails: eamaya@unb.br, alvares@AlvaresTech.com; Gudwin, R.R. [State University of Campinas (UNICAMP), SP (Brazil). Computer Engineering and Industrial Automation Dept.], E-mail: gudwin@dca.fee.unicamp.br

    2009-07-01

    The hydroelectric power plant of Balbina is implementing a condition based maintenance system applying an open, modular and scalable integrated architecture to provide comprehensive solutions and support to the end users like operational and maintenance team. The system called SIMPREBAL (Predictive Maintenance System of Balbina) is advocate of open standards, in particular through collaborative research programmers. In the developing is clearly understands the need for both, industry standards and a simple to use software development tool chain, supporting the development of complex condition based maintenance systems with multiple partners. The Open System Architecture for Condition Based Maintenance (OSA-CBM) is a standard that consider seven hierarchic layers that represent a logic transition or performed data flow from the data acquisition layer, through the intermediates layers as signal processing, condition monitor, health assessment, prognostics and decision support, to arrive to the presentation layer. SIMPREBAL is being implementing as an OSA-CBM software framework and tool set that allows the creation of truly integrated, comprehensive maintenance solutions through the internet. This paper identifies specific benefits of the application of the OSA-CBM in comprehensive solutions of condition based maintenance for a hydroelectric power plant. (author)

  6. Maintenance grouping strategy for multi-component systems with dynamic contexts

    International Nuclear Information System (INIS)

    Vu, Hai Canh; Do, Phuc; Barros, Anne; Bérenguer, Christophe

    2014-01-01

    This paper presents a dynamic maintenance grouping strategy for multi-component systems with both “positive” and “negative” economic dependencies. Positive dependencies are commonly due to setup cost whereas negative dependencies are related to shutdown cost. Actually, grouping maintenance activities can save part of the setup cost, but can also in the same time increase the shutdown cost. Until now, both types of dependencies have been jointly taken into account only for simple system structures as pure series. The first aim of this paper is to investigate the case of systems with any combination of basic structures (series, parallel or k-out-of n structures). A cost model and a heuristic optimization scheme are proposed since the optimization of maintenance grouping strategy for such multi-component systems leads to a NP-complete problem. Then the second objective is to propose a finite horizon (dynamic) model in order to optimize online the maintenance strategy in the presence of dynamic contexts (change of the environment, the working condition, the production process, etc). A numerical example of a 16-component system is finally introduced to illustrate the use and the advantages of the proposed approach in the maintenance optimization framework. - Highlights: • A dynamic grouping maintenance strategy for complex structure systems is proposed. • Impacts of the system structure on grouping maintenance are investigated. • A grouping approach based on the rolling horizon and GA algorithm is proposed. • Different dynamic contexts and their impacts on grouping maintenance are studied. • The proposed approach can help to update the maintenance planning in dynamic contexts

  7. Dynamic decision-making for reliability and maintenance analysis of manufacturing systems based on failure effects

    Science.gov (United States)

    Zhang, Ding; Zhang, Yingjie

    2017-09-01

    A framework for reliability and maintenance analysis of job shop manufacturing systems is proposed in this paper. An efficient preventive maintenance (PM) policy in terms of failure effects analysis (FEA) is proposed. Subsequently, reliability evaluation and component importance measure based on FEA are performed under the PM policy. A job shop manufacturing system is applied to validate the reliability evaluation and dynamic maintenance policy. Obtained results are compared with existed methods and the effectiveness is validated. Some vague understandings for issues such as network modelling, vulnerabilities identification, the evaluation criteria of repairable systems, as well as PM policy during manufacturing system reliability analysis are elaborated. This framework can help for reliability optimisation and rational maintenance resources allocation of job shop manufacturing systems.

  8. FFTF/IEM [Fast Flux Test Facility/Interim Examination and Maintenance] cell fuel pin weighing system: Remote maintenance design considerations

    International Nuclear Information System (INIS)

    Gibbons, P.W.

    1986-06-01

    A Fuel Pin Weighing Machine has been developed for use in the Fast Flux Test Facility (FFTF) Interim Examination and Maintenance (IEM) Cell to assist in identifying an individual breached fuel pin from its fuel assembly pin bundle. Optimum configuration for remote maintenance was a major consideration in the design of each element of the Pin Weighing System

  9. The personnel protection system for a Synchrotron Radiation Accelerator Facility: Radiation safety perspective

    International Nuclear Information System (INIS)

    Liu, J.C.

    1993-05-01

    The Personnel Protection System (PPS) at the Stanford Synchrotron Radiation Laboratory is summarized and reviewed from the radiation safety point of view. The PPS, which is designed to protect people from radiation exposure to beam operation, consists of the Access Control System (ACS) and the Beam Containment System (BCS), The ACS prevents people from being exposed to the very high radiation level inside the shielding housing (also called a PPS area). The ACS for a PPS area consists of the shielding housing and a standard entry module at every entrance. The BCS prevents people from being exposed to the radiation outside a PPS area due to normal and abnormal beam losses. The BCS consists of the shielding (shielding housing and metal shielding in local areas), beam stoppers, active current limiting devices, and an active radiation monitor system. The system elements for the ACS and BCS and the associated interlock network are described. The policies and practices in setting up the PPS are compared with some requirements in the US Department of Energy draft Order of Safety of Accelerator Facilities

  10. Optimizing man-machine performance of a personnel access restriction security system

    International Nuclear Information System (INIS)

    Banks, W.W.; Moore, J.W.

    1988-01-01

    This paper describes a human engineering design and analysis effort for a major security system upgrade at a DOE facility. This upgrade was accomplished by replacing an obsolete and poorly human engineered security screening both the with a new, user oriented, semiautomated, computer-based access control system. Human factors engineers assisted the designer staff in specifying a security access interface to physically and cognitively accommodate all employees which included handicapped individuals in wheel chairs, and several employees who were severely disabled, both visually and aurally. The new access system was intended to control entry into sensitive exclusion areas by requiring personnel to enter a security screening booth and interact with card reader devices and a-simple-to-operate access control panel system. Extensive man-machine testing with prototype mock-ups was conducted to assess human engineered design features and to illuminate potentially confusing or difficult-to-operated hardware placement, layout, and operation sequencing. These evaluations, along with the prototype mock-ups, provided input which resulted in a prototype which was easy to enter, operate, and understand by end users. This prototype later served as the design basis for the final systems design

  11. Requirements for and prospects of further development of training of personnel for start-up, operation and maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Metke, E.

    1983-01-01

    The results are assessed of the work of training centres and of the training power plant. Since 1979, 1100 persons have undergone training. The planned recruitment quotas have not been fulfilled, the problems being caused by the uneven time distribution of the construction of units of nuclear power plants, the varying quality and number of trainers and tutors; there are problems with simulator training in the USSR. It will be necessary to integrate existing training capacity for all categories of nuclear power plant personnel in one organization unit. (M.D.)

  12. The virtual maintenance system: a computer-based support tool for robust design, product monitoring, fault diagnosis and maintenance planning

    NARCIS (Netherlands)

    van Houten, Frederikus J.A.M.; Kimura, F.

    2000-01-01

    Digital (geometric) product models can be used for maintainability analysis and maintenance planning. It is not feasible to build digital product models for maintenance purposes only, but if a digital product model is available, it may be used to support many maintenance-related engineering tasks.

  13. A reliability centered maintenance model applied to the auxiliary feedwater system of a nuclear power plant

    International Nuclear Information System (INIS)

    Araujo, Jefferson Borges

    1998-01-01

    The main objective of maintenance in a nuclear power plant is to assure that structures, systems and components will perform their design functions with reliability and availability in order to obtain a safety and economic electric power generation. Reliability Centered Maintenance (RCM) is a method of systematic review to develop or optimize Preventive Maintenance Programs. This study presents the objectives, concepts, organization and methods used in the development of RCM application to nuclear power plants. Some examples of this application are included, considering the Auxiliary Feedwater System of a generic two loops PWR nuclear power plant of Westinghouse design. (author)

  14. Advanced remote handling for future applications: The advanced integrated maintenance system

    International Nuclear Information System (INIS)

    Herndon, J.N.; Kring, C.T.; Rowe, J.C.

    1986-01-01

    The Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory has been developing advanced techniques for remote maintenance of future US fuel reprocessing plants. The developed technology has a wide spectrum of application for other hazardous environments. These efforts are based on the application of teleoperated, force-reflecting servomanipulators for dexterous remote handling with television viewing for large-volume hazardous applications. These developments fully address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in fuel reprocessing. This paper covers the primary emphasis in the present program; the design, fabrication, installation, and operation of a prototype remote handling system for reprocessing applications, the Advanced Integrated Maintenance System

  15. A remote telepresence robotic system for inspection and maintenance of a nuclear power plant

    International Nuclear Information System (INIS)

    Crane, C.D. III; Tulenko, J.S.

    1993-01-01

    Progress in reported in the areas of environmental hardening; database/world modeling; man-machine interface; development of the Advanced Liquid Metal Reactor (ALMR) maintenance inspection robot design; and Articulated Transporter/Manipulator System (ATMS) development

  16. An evaluation system of the setting up of predictive maintenance programmes

    International Nuclear Information System (INIS)

    Carnero, MaCarmen

    2006-01-01

    Predictive Maintenance can provide an increase in safety, quality and availability in industrial plants. However, the setting up of a Predictive Maintenance Programme is a strategic decision that until now has lacked analysis of questions related to its setting up, management and control. In this paper, an evaluation system is proposed that carries out the decision making in relation to the feasibility of the setting up. The evaluation system uses a combination of tools belonging to operational research such as: Analytic Hierarchy Process, decision rules and Bayesian tools. This system is a help tool available to the managers of Predictive Maintenance Programmes which can both increase the number of Predictive Maintenance Programmes set up and avoid the failure of these programmes. The Evaluation System has been tested in a petrochemical plant and in a food industry

  17. Best Practices in Photovoltaic System Operations and Maintenance: 2nd Edition

    Energy Technology Data Exchange (ETDEWEB)

    Whaley, Cass [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-12-01

    This best practices guide encourages high-quality system deployment and operation that improves lifetime project performance and energy production while reducing, or at least optimizing, costs to deliver an operation and maintenance program.

  18. Advanced Visual and Instruction Systems for Maintenance Support (AVIS-MS)

    National Research Council Canada - National Science Library

    Badler, Norman I; Allbeck, Jan M

    2006-01-01

    .... Moreover, the realities of real-world maintenance may not permit the hardware indulgences and rigid controls of laboratory settings for visualization and training systems, and at the same time...

  19. Financial Management: Financial Reporting of Deferred Maintenance Information on Navy Weapon Systems for FY 2002

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    .... The Navy reported an estimated $ 1.3 billion of deterred maintenance at the beginning of FY 2002 on its aircraft, ships, missiles, combat vehicles, and other weapon systems national defense property, plant, and equipment (PP&E) commodities...

  20. Didactic Conditions of Improvement of Pedagogical Personnel Training at Higher Education Institutions to Dual Education in the System of VET

    Science.gov (United States)

    Zholdasbekova, Saule; Nurzhanbayeva, Zhanet; Mavedov, Rixsibai; Saipov, Amangeldi; Zhiyentayeva, Begaim; Tlemissova, Alja

    2016-01-01

    The purpose of the article consists in representation to discussion by specialists of the revealed didactic conditions of enhancement of preparation of the pedagogical personnel in higher education institution to dual training in the system of vocational and educational training. Modeling, aspect system, comparative and structural analyses…