WorldWideScience

Sample records for system gupfs project

  1. The global unified parallel file system (GUPFS) project: FY 2002 activities and results

    Energy Technology Data Exchange (ETDEWEB)

    Butler, Gregory F.; Lee, Rei Chi; Welcome, Michael L.

    2003-04-07

    The Global Unified Parallel File System (GUPFS) project is a multiple-phase, five-year project at the National Energy Research Scientific Computing (NERSC) Center to provide a scalable, high performance, high bandwidth, shared file system for all the NERSC production computing and support systems. The primary purpose of the GUPFS project is to make it easier to conduct advanced scientific research using the NERSC systems. This is to be accomplished through the use of a shared file system providing a unified file namespace, operating on consolidated shared storage that is directly accessed by all the NERSC production computing and support systems. During its first year, FY 2002, the GUPFS project focused on identifying, testing, and evaluating existing and emerging shared/cluster file system, SAN fabric, and storage technologies; identifying NERSC user input/output (I/O) requirements, methods, and mechanisms; and developing appropriate benchmarking methodologies and benchmark codes for a parallel environment. This report presents the activities and progress of the GUPFS project during its first year, the results of the evaluations conducted, and plans for near-term and longer-term investigations.

  2. The global unified parallel file system (GUPFS) project: FY 2003 activities and results

    Energy Technology Data Exchange (ETDEWEB)

    Butler, Gregory F.; Baird William P.; Lee, Rei C.; Tull, Craig E.; Welcome, Michael L.; Whitney Cary L.

    2004-04-30

    The Global Unified Parallel File System (GUPFS) project is a multiple-phase project at the National Energy Research Scientific Computing (NERSC) Center whose goal is to provide a scalable, high-performance, high-bandwidth, shared file system for all of the NERSC production computing and support systems. The primary purpose of the GUPFS project is to make the scientific users more productive as they conduct advanced scientific research at NERSC by simplifying the scientists' data management tasks and maximizing storage and data availability. This is to be accomplished through the use of a shared file system providing a unified file namespace, operating on consolidated shared storage that is accessible by all the NERSC production computing and support systems. In order to successfully deploy a scalable high-performance shared file system with consolidated disk storage, three major emerging technologies must be brought together: (1) shared/cluster file systems software, (2) cost-effective, high-performance storage area network (SAN) fabrics, and (3) high-performance storage devices. Although they are evolving rapidly, these emerging technologies individually are not targeted towards the needs of scientific high-performance computing (HPC). The GUPFS project is in the process of assessing these emerging technologies to determine the best combination of solutions for a center-wide shared file system, to encourage the development of these technologies in directions needed for HPC, particularly at NERSC, and to then put them into service. With the development of an evaluation methodology and benchmark suites, and with the updating of the GUPFS testbed system, the project did a substantial number of investigations and evaluations during FY 2003. The investigations and evaluations involved many vendors and products. From our evaluation of these products, we have found that most vendors and many of the products are more focused on the commercial market. Most vendors

  3. Flexible AC transmission systems. Modelling and control

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Xiao-Ping [Birmingham Univ. (United Kingdom); Rehtanz, Christian [Technische Univ. Dortmund (Germany); Pal, Bikash [Imperial College, London (United Kingdom)

    2012-11-01

    This monograph presents advanced modelling, analysis and control techniques of FACTS. These topics reflect the recent research and development of FACTS controllers, and anticipate the future applications of FACTS in power systems. The book covers comprehensively a range of power-system control problems: from steady-state voltage and power flow control, to voltage and reactive power control, to voltage stability control, to small signal stability control using FACTS controllers. The book presents the modelling of the latest FACTS controllers for power flow control, compensation and power quality (IPFC, GUPF, VSC HVDC and M-VSCHVDC, etc.) in power system analysis. The selection is evaluated by the actual and likely future practical relevance of each. The material is derived mainly from the research and industrial development in which the authors have been heavily involved. The book is timely and of great value to power engineering engineers and students of modelling, simulations and control design of FACTS for a broad practical range of power system operation, planning and control problems.

  4. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  5. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  6. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  7. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  8. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  9. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  10. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  11. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  12. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  13. User-Oriented Project Accounting System.

    Science.gov (United States)

    Hess, Larry G.; Alcorn, Lisa S.

    1990-01-01

    The project accounting system used by the University of Illinois Urbana-Champaign School of Chemical Sciences exchanges financial data with the campus' central accounting system and allows integration of this information with user-entered data to produce an easily read, fully obligated project accounting statement for the budget and period…

  14. Mirror Confinement Systems: project summaries

    International Nuclear Information System (INIS)

    1980-07-01

    This report contains descriptions of the projects supported by the Mirror Confinement Systems (MCS) Division of the Office of Fusion Energy. The individual project summaries were prepared by the principal investigators, in collaboration with MCS staff office, and include objectives and milestones for each project. In addition to project summaries, statements of Division objectives and budget summaries are also provided

  15. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  16. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  17. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  18. Health System Measurement Project

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Health System Measurement Project tracks government data on critical U.S. health system indicators. The website presents national trend data as well as detailed...

  19. ANG coal gasification project management control system report. [Great Plains project

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  20. Web-based Project Reporting System

    Data.gov (United States)

    US Agency for International Development — Web-PRS is a web-based system that captures financial information and project status information that is sortable by geographical location, pillar, project type and...

  1. Real Property Project Tracking System (RPPTS)

    Data.gov (United States)

    Department of Veterans Affairs — The Real Property Project Tracking System (RPPTS), formerly known as the Lease/Project Tracking (LEASE) database, contains information about lease and land projects...

  2. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  3. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  4. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  5. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  6. Implementing polytope projects for smart systems

    CERN Document Server

    Iordache, Octavian

    2017-01-01

    This book presents a domain of extreme industrial and scientific interest: the study of smart systems and structures. It presents polytope projects as comprehensive physical and cognitive architectures that support the investigation, fabrication and implementation of smart systems and structures. These systems feature multifunctional components that can perform sensing, control, and actuation. In light of the fact that devices, tools, methodologies and organizations based on electronics and information technology for automation, specific to the third industrial revolution, are increasingly reaching their limits, it is essential that smart systems be implemented in industry. Polytope projects facilitate the utilization of smart systems and structures as key elements of the fourth industrial revolution. The book begins by presenting polytope projects as a reference architecture for cyber-physical systems and smart systems, before addressing industrial process synthesis in Chapter 2. Flow-sheet trees, cyclic sep...

  7. TidGen Power System Commercialization Project

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, Christopher R. [President & CEO; McEntee, Jarlath [VP Engineering & CTO

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric

  8. Expert system application education project

    Science.gov (United States)

    Gonzelez, Avelino J.; Ragusa, James M.

    1988-01-01

    Artificial intelligence (AI) technology, and in particular expert systems, has shown potential applicability in many areas of operation at the Kennedy Space Center (KSC). In an era of limited resources, the early identification of good expert system applications, and their segregation from inappropriate ones can result in a more efficient use of available NASA resources. On the other hand, the education of students in a highly technical area such as AI requires an extensive hands-on effort. The nature of expert systems is such that proper sample applications for the educational process are difficult to find. A pilot project between NASA-KSC and the University of Central Florida which was designed to simultaneously address the needs of both institutions at a minimum cost. This project, referred to as Expert Systems Prototype Training Project (ESPTP), provided NASA with relatively inexpensive development of initial prototype versions of certain applications. University students likewise benefit by having expertise on a non-trivial problem accessible to them at no cost. Such expertise is indispensible in a hands-on training approach to developing expert systems.

  9. A secure communication system using projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems

    International Nuclear Information System (INIS)

    Thang Manh Hoang; Nakagawa, Masahiro

    2008-01-01

    In this paper, a chaotic secure communication system is proposed by using the schemes of projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems and the modulation technique of synchronization-manifold shift keying. Further, the security of the proposed system is enhanced by using non-stationary dynamics in the master and/or non-stationary synchronization manifolds. The specific examples using modified Ikeda systems demonstrate and verify the effectiveness of the proposed system

  10. IT Project Management from a Systems Thinking Perspective

    NARCIS (Netherlands)

    van Eck, Pascal; Ponisio, Laura

    2008-01-01

    Purpose: We proposes a Systems Thinking approach to the study of IT project management and show how this approach helps project managers in controlling their projects. Systems Thinking is a holistic problem solving method in which system behaviour emerges from the interaction of system components.

  11. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W

    2006-01-01

    In the context of Geographical Information Systems (GIS) the book offers a timely review of map projections (sphere, ellipsoid, rotational surfaces) and geodetic datum transformations. For the needs of photogrammetry, computer vision, and remote sensing space projective mappings are reviewed.

  12. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  13. UHP lamp systems for projection applications

    International Nuclear Information System (INIS)

    Derra, Guenther; Moench, Holger; Fischer, Ernst; Giese, Hermann; Hechtfischer, Ulrich; Heusler, Gero; Koerber, Achim; Niemann, Ulrich; Noertemann, Folke-Charlotte; Pekarski, Pavel; Pollmann-Retsch, Jens; Ritz, Arnd; Weichmann, Ulrich

    2005-01-01

    Projection systems have found widespread use in conference rooms and other professional applications during the last decade and are now entering the home TV market at a considerable pace. Projectors as small as about one litre are able to deliver several thousand screen lumens and are, with a system efficacy of over 10 lm W -1 , the most efficient display systems realized today. Short arc lamps are a key component for projection systems of the highest efficiency for small-size projection displays. The introduction of the ultra high performance (UHP) lamp system by Philips in 1995 can be identified as one of the key enablers of the commercial success of projection systems. The UHP lamp concept features outstanding arc luminance, a well suited spectrum, long life and excellent lumen maintenance. For the first time it combines a very high pressure mercury discharge lamp with extremely short and stable arc gap with a regenerative chemical cycle keeping the discharge walls free from blackening, leading to lifetimes of over 10 000 h. Since the introduction of the UHP lamp system, many important new technology improvements have been realized: burner designs for higher lamp power, advanced ignition systems, miniaturized electronic drivers and innovative reflector concepts. These achievements enabled the impressive increase of projector light output, a remarkable reduction in projector size and even higher optical efficiency in projection systems during the last years. In this paper the concept of the UHP lamp system is described, followed by a discussion of the technological evolution the UHP lamp has undergone so far. Last, but not least, the important improvements of the UHP lamp system including the electronic driver and the reflector are discussed. (review article)

  14. Engineered Geothermal System Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Petty, Susan

    2014-06-19

    In June 2009, AltaRock Energy began field work on a project supported by the U.S. Department of Energy entitled “Use of Multiple Stimulations to Improve Economics of Engineered Geothermal Systems in Shallow High Temperature Intrusives.” The goal of the project was to develop an Engineered Geothermal System (EGS) in the portion of The Geysers geothermal field operated by the Northern California Power Agency (NCPA). The project encountered several problems while deepening Well E-7 which culminated in the suspension of field activities in September 2009. Some of the problems encountered are particular to The Geysers area, while others might be encountered in any geothermal field, and they might be avoided in future operations.

  15. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  16. Business System Planning Project, Alternatives Analysis

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files

  17. Controlled Ecological Life Support System Breadboard Project - 1988

    Science.gov (United States)

    Knott, W. M.

    1989-01-01

    The Controlled Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989-1993 are listed. The biomass production chamber to be used by the project is described.

  18. Project W-049H Collection System Acceptance Test

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) Program for Project W-049H covers the following activities: Disposal system, Collection system, Instrumentation and control system. Each activity has its own ATP. The purpose of the ATPs is to verify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. This ATP has been prepared to demonstrate that the Collection System Instrumentation functions as required by project criteria

  19. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  20. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  1. Information systems project management: methods, tools, and techniques

    OpenAIRE

    Mcmanus, John; Wood-Harper, Trevor

    2004-01-01

    Information Systems Project Management offers a clear and logical exposition of how to plan, organise and monitor projects effectively in order to deliver quality information systems within time, to budget and quality. This new book by John McManus and Trevor Wood-Harper is suitable for upper level undergraduates and postgraduates studying project management and Information Systems. Practising managers will also find it to be a valuable tool in their work. Managing information systems pro...

  2. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  3. Project management system for the decommissioning of research reactors

    International Nuclear Information System (INIS)

    Park, J. H.

    2006-01-01

    KAERI has developed a computer information system, named DECOMMIS, for the project management with the increased effectiveness of the decommissioning projects and the record keeping for a next decommissioning project. The management system consists of three parts, code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites and the system can play roles of daily work reports to minimize the time gap between the dismantling activities and the evaluation of the data for project management. The DDPS provides useful information to the staff for more effective project management and this information include several fields, such as project progress management, man power management, waste management, radiation dose of workers and so on. It is expected that the system would enable to maintain the decommissioning data, to prepare the source data for the R and D for development of planning tools and to give information to the staff for the decision on the progress of the projects. In this paper, the overall system will be briefly explained and several examples of the utilization, focused on the waste and manpower control, for the project management will be introduced

  4. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  5. An Internet-Based Accounting Information Systems Project

    Science.gov (United States)

    Miller, Louise

    2012-01-01

    This paper describes a student project assignment used in an accounting information systems course. We are now truly immersed in the internet age, and while many required accounting information systems courses and textbooks introduce database design, accounting software development, cloud computing, and internet security, projects involving the…

  6. The SIMPSONS project: An integrated Mars transportation system

    Science.gov (United States)

    Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett

    In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.

  7. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  8. Controlled ecological life support system breadboard project, 1988

    Science.gov (United States)

    Knott, W. M.

    1990-01-01

    The Closed Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989 to 1993 are listed. The Biomass Production Chamber (BPC) became operational and tests of wheat as a single crop are nearing completion.

  9. World Energy Projection System model documentation

    International Nuclear Information System (INIS)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA

  10. World Energy Projection System model documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

  11. Consonance in Information System Projects: A Relationship Marketing Perspective

    Science.gov (United States)

    Lin, Pei-Ying

    2010-01-01

    Different stakeholders in the information system project usually have different perceptions and expectations of the projects. There is seldom consistency in the stakeholders' evaluations of the project outcome. Thus the outcomes of information system projects are usually disappointing to one or more stakeholders. Consonance is a process that can…

  12. Systems engineering real estate development projects

    Science.gov (United States)

    Gusakova, Elena; Titarenko, Boris; Stepanov, Vitaliy

    2017-10-01

    In recent years, real estate development has accumulated a wealth of experience in implementing major projects, which requires comprehension and systematization. The scientific instrument of system engineering is studied in the article and is substantively interpreted with reference to real estate development projects. The most perspective approaches and models are substantiated, allowing strategically to plan the life cycle of the project as a whole, and also to solve the engineering butt problems of the project. The relevance of further scientific studies of regularities and specifics of the life cycle of real estate development projects conducted at the Moscow State University of Economics and Management at the ISTA department is shown.

  13. Laser display system for multi-depth screen projection scenarios.

    Science.gov (United States)

    La Torre, J Pablo; Mayes, Nathan; Riza, Nabeel A

    2017-11-10

    Proposed is a laser projection display system that uses an electronically controlled variable focus lens (ECVFL) to achieve sharp and in-focus image projection over multi-distance three-dimensional (3D) conformal screens. The system also functions as an embedded distance sensor that enables 3D mapping of the multi-level screen platform before the desired laser scanned beam focused/defocused projected spot sizes are matched to the different localized screen distances on the 3D screen. Compared to conventional laser scanning and spatial light modulator (SLM) based projection systems, the proposed design offers in-focus non-distorted projection over a multi-distance screen zone with varying depths. An experimental projection system for a screen depth variation of 65 cm is demonstrated using a 633 nm laser beam, 3 KHz scan speed galvo-scanning mirrors, and a liquid-based ECVFL. As a basic demonstration, an in-house developed MATLAB based graphic user interface is deployed to work along with the laser projection display, enabling user inputs like text strings or predefined image projection. The user can specify projection screen distance, scanned laser linewidth, projected text font size, projected image dimensions, and laser scanning rate. Projected images are shown highlighting the 3D control capabilities of the display, including the production of a non-distorted image onto two-depths versus a distorted image via dominant prior-art projection methods.

  14. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  15. Focusing Information Systems Post-Graduate Research Projects

    Directory of Open Access Journals (Sweden)

    Gail Ridley

    1996-11-01

    Full Text Available This paper reports on an investigation of mechanisms that assist Information Systems post-graduate research students to focus their projects. An evaluation is presented of the experiences of Information Systems research students in focussing their research projects based on a survey conducted of students who participated in two of the first three Information Systems doctoral consortia to be held in Australia. The survey sought to determine whether a doctoral consortium or 'systematic expert review' is the most valuable mechanism for focussing a research proposal. Systematic expert review was considered by the students to be more effective than the doctoral consortium process for the purpose of focussing their research project proposals.

  16. Tank waste remediation system characterization project quality policies. Revision 1

    International Nuclear Information System (INIS)

    Trimble, D.J.

    1995-01-01

    These Quality Policies (QPs) describe the Quality Management System of the Tank Waste Characterization Project (hereafter referred to as the Characterization Project), Tank Waste Remediation System (TWRS), Westinghouse Hanford Company (WHC). The Quality Policies and quality requirements described herein are binding on all Characterization Project organizations. To achieve quality, the Characterization Project management team shall implement this Characterization Project Quality Management System

  17. Projective measurements in quantum and classical optical systems

    CSIR Research Space (South Africa)

    Roux, FS

    2014-09-01

    Full Text Available equally well to both classical and quantum optical systems. A projective measurement, in the context of quantum mechanics, is understood to be the process where a projection operator operates on some input state. Often this projection operator is composed...) Projective measurements in quantum and classical optical systems Filippus S. Roux* and Yingwen Zhang CSIR National Laser Centre, P.O. Box 395, Pretoria 0001, South Africa (Received 3 July 2014; published 22 September 2014) Experimental setups for the optical...

  18. Identifying inaccuracy of MS Project using system analysis

    Science.gov (United States)

    Fachrurrazi; Husin, Saiful; Malahayati, Nurul; Irzaidi

    2018-05-01

    The problem encountered in project owner’s financial accounting report is the difference in total project costs of MS Project to the Indonesian Standard (Standard Indonesia Standard / Cost Estimating Standard Book of Indonesia). It is one of the MS Project problems concerning to its cost accuracy, so cost data cannot be used in an integrated way for all project components. This study focuses on finding the causes of inaccuracy of the MS Projects. The aim of this study, which is operationally, are: (i) identifying cost analysis procedures for both current methods (SNI) and MS Project; (ii) identifying cost bias in each element of the cost analysis procedure; and (iii) analysing the cost differences (cost bias) in each element to identify what the cause of inaccuracies in MS Project toward SNI is. The method in this study is comparing for both the system analysis of MS Project and SNI. The results are: (i) MS Project system in Work of Resources element has limitation for two decimal digits only, have led to its inaccuracy. Where the Work of Resources (referred to as effort) in MS Project represents multiplication between the Quantities of Activities and Requirements of resources in SNI; (ii) MS Project and SNI have differences in the costing methods (the cost estimation methods), in which the SNI uses the Quantity-Based Costing (QBC), meanwhile MS Project uses the Time-Based Costing (TBC). Based on this research, we recommend to the contractors who use SNI should make an adjustment for Work of Resources in MS Project (with correction index) so that it can be used in an integrated way to the project owner’s financial accounting system. Further research will conduct for improvement the MS Project as an integrated tool toward all part of the project participant.

  19. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  20. Collaboration and Virtualization in Large Information Systems Projects

    Directory of Open Access Journals (Sweden)

    Stefan Ioan NITCHI

    2009-01-01

    Full Text Available A project is evolving through different phases from idea and conception until the experiments, implementation and maintenance. The globalization, the Internet, the Web and the mobile computing changed many human activities, and in this respect, the realization of the Information System (IS projects. The projects are growing, the teams are geographically distributed, and the users are heterogeneous. In this respect, the realization of the large Information Technology (IT projects needs to use collaborative technologies. The distribution of the team, the users' heterogeneity and the project complexity determines the virtualization. This paper is an overview of these aspects for large IT projects. It shortly present a general framework developed by the authors for collaborative systems in general and adapted to collaborative project management. The general considerations are illustrated on the case of a large IT project in which the authors were involved.

  1. Optimized application of systems engineering to nuclear waste repository projects

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Shepard, M.

    1986-01-01

    The purpose of this presentation is to describe a fully optimized application of systems engineering methods and philosophy to the management of a large nuclear waste repository project. Knowledge gained from actual experience with the use of the systems approach on two repository projects is incorporated in the material presented. The projects are currently evaluating the isolation performance of different geologic settings and are in different phases of maturity. Systems engineering methods were applied by the principal author at the Waste Isolation Pilot Plant (WIPP) in the form of a functional analysis. At the Basalt Waste Isolation Project (BWIP), the authors assisted the intergrating contractor with the development and application of systems engineering methods. Based on this experience and that acquired from other waste management projects, an optimized plan for applying systems engineering techniques was developed. The plan encompasses the following aspects: project organization, developing and defining requirements, assigning work responsibilities, evaluating system performance, quality assurance, controlling changes, enhancing licensability, optimizing project performance, and addressing regulatory issues. This information is presented in the form of a roadmap for the practical application of system engineering principles to a nuclear waste repository project

  2. World energy projection system: Model documentation

    Science.gov (United States)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES), provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report.

  3. World energy projection system: Model documentation

    International Nuclear Information System (INIS)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO) (Figure 1). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES) provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report

  4. Project Management Plan for Initial Tank Retrieval Systems, Project W-211

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    1999-01-01

    Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AP-108, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the Privatized waste processing plant and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump based retrieval system for any DST. This Project Management Plan (PMP) documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  5. TA-55 facility control system upgrade project - human-system interface functional requirements

    International Nuclear Information System (INIS)

    Atkins, W.H.; Pope, N.G.; Turner, W.J.; Brown, R.E.

    1995-11-01

    The functional requirements for that part of the Technical Area (TA)-55 Operations Center Upgrade Project that involves the human-system interface (HSI) are described in this document. The upgrade project seeks to replace completely the center's existing computerized data acquisition and display system, which consists of the field multiplexer units, Data General computer systems, and associated peripherals and software. The upgrade project has two parts-the Facility Data Acquisition Interface System (FDAIS) and the HSI. The HSI comprises software and hardware to provide a high-level graphical operator interface to the data acquisition system, as well as data archiving, alarm annunciation, and logging. The new system will be built with modern, commercially available components; it will improve reliability and maintainability, and it can be expanded for future needs

  6. Project Specific Quality Assurance Plan Project (QAPP) W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    HALL, L.R.

    2000-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Project Hanford Quality Assurance Program is implemented by CH2M HILL Hanford Group Inc (CHG) for managing the Initial Tank Retrieval Systems (ITRS), Project W-211. This QAPP is responsive to the CHG Quality Assurance Program Description (QAPD) (LMH-MP-599) which provides direction for compliance to 10 CFR 830 120, ''Nuclear Safety Management, Quality Assurance Requirements'', and DOE Order 5700 6C, ''Quality Assurance'' Project W-211 modifies existing facilities and provides systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. This project includes the design, procurement, construction, startup and turnover of these retrieval systems This QAPP identifies organizational structures and responsibilities. Implementing procedures used by CHG project management can be found in the CHG Quality Assurance Program (CHG QAP) Implementation Matrix located in HNF-IP-0842, Volume XI, Attachment Proposed verification and inspection activities for critical items within the scope of project W-211 are identified in Attachment 1 W-211. Project participants will identify the implementing procedures used by their organization within their QAF'Ps. This project specific QAPP is used to identify requirements in addition to the QAPD and provide, by reference, additional information to other project documents

  7. Virtual fringe projection system with nonparallel illumination based on iteration

    International Nuclear Information System (INIS)

    Zhou, Duo; Wang, Zhangying; Gao, Nan; Zhang, Zonghua; Jiang, Xiangqian

    2017-01-01

    Fringe projection profilometry has been widely applied in many fields. To set up an ideal measuring system, a virtual fringe projection technique has been studied to assist in the design of hardware configurations. However, existing virtual fringe projection systems use parallel illumination and have a fixed optical framework. This paper presents a virtual fringe projection system with nonparallel illumination. Using an iterative method to calculate intersection points between rays and reference planes or object surfaces, the proposed system can simulate projected fringe patterns and captured images. A new explicit calibration method has been presented to validate the precision of the system. Simulated results indicate that the proposed iterative method outperforms previous systems. Our virtual system can be applied to error analysis, algorithm optimization, and help operators to find ideal system parameter settings for actual measurements. (paper)

  8. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls

    International Nuclear Information System (INIS)

    Mullee, G.R.

    1986-01-01

    The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on system status, tag-outs, radiological work permits, etc. An ongoing effort is being directed toward maintaining operating instructions and system schematics, etc. current as the Plant configuration changes. The experience with the Configuration Control System to date has been favorable

  9. A projective surgical navigation system for cancer resection

    Science.gov (United States)

    Gan, Qi; Shao, Pengfei; Wang, Dong; Ye, Jian; Zhang, Zeshu; Wang, Xinrui; Xu, Ronald

    2016-03-01

    Near infrared (NIR) fluorescence imaging technique can provide precise and real-time information about tumor location during a cancer resection surgery. However, many intraoperative fluorescence imaging systems are based on wearable devices or stand-alone displays, leading to distraction of the surgeons and suboptimal outcome. To overcome these limitations, we design a projective fluorescence imaging system for surgical navigation. The system consists of a LED excitation light source, a monochromatic CCD camera, a host computer, a mini projector and a CMOS camera. A software program is written by C++ to call OpenCV functions for calibrating and correcting fluorescence images captured by the CCD camera upon excitation illumination of the LED source. The images are projected back to the surgical field by the mini projector. Imaging performance of this projective navigation system is characterized in a tumor simulating phantom. Image-guided surgical resection is demonstrated in an ex-vivo chicken tissue model. In all the experiments, the projected images by the projector match well with the locations of fluorescence emission. Our experimental results indicate that the proposed projective navigation system can be a powerful tool for pre-operative surgical planning, intraoperative surgical guidance, and postoperative assessment of surgical outcome. We have integrated the optoelectronic elements into a compact and miniaturized system in preparation for further clinical validation.

  10. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  11. Advanced Ground Systems Maintenance Physics Models For Diagnostics Project

    Science.gov (United States)

    Perotti, Jose M.

    2015-01-01

    The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations. This project will develop and implement high-fidelity physics-based modeling techniques tosimulate the real-time operation of cryogenics and other fluids systems and, when compared to thereal-time operation of the actual systems, provide assessment of their state. Physics-modelcalculated measurements (called “pseudo-sensors”) will be compared to the system real-timedata. Comparison results will be utilized to provide systems operators with enhanced monitoring ofsystems' health and status, identify off-nominal trends and diagnose system/component failures.This capability can also be used to conduct planning and analysis of cryogenics and other fluidsystems designs. This capability will be interfaced with the ground operations command andcontrol system as a part of the Advanced Ground Systems Maintenance (AGSM) project to helpassure system availability and mission success. The initial capability will be developed for theLiquid Oxygen (LO2) ground loading systems.

  12. A modular projection autostereoscopic system for stereo cinema

    Science.gov (United States)

    Elkhov, Victor A.; Kondratiev, Nikolai V.; Ovechkis, Yuri N.; Pautova, Larisa V.

    2009-02-01

    The lenticular raster system for 3D movies non-glasses show designed by NIKFI demonstrated commercially in Moscow in the 40'st of the last century. Essential lack of this method was narrow individual viewing zone as only two images on the film used. To solve this problem, we propose to use digital video projective system with modular principle of its design. Increase of the general number of the pixels forming the stereo image is reached by using of more than one projector. The modular projection autostereoscopic system for demonstration of the 3D movies includes diffuser screen; lenticular plate located in front of the screen; projective system consisted from several projectors and the block of parallax panoramogram fragments creator. By means of this block the parallax panoramogram is broken into fragments which quantity corresponds to number of projectors. For the large dimension lenticular screen making rectangular fragments of inclined raster were joined in a uniform leaf. To obtain the needed focal distance of the screen lenses we used immersion - aqueous solution of glycerin. The immersion also let essentially decrease visibility of fragments joints. An experimental prototype of the modular projection autostereoscopic system was created to validate proposed system.

  13. SNF sludge treatment system preliminary project execution plan

    International Nuclear Information System (INIS)

    Flament, T.A.

    1998-01-01

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS

  14. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  15. The NASA Advanced Space Power Systems Project

    Science.gov (United States)

    Mercer, Carolyn R.; Hoberecht, Mark A.; Bennett, William R.; Lvovich, Vadim F.; Bugga, Ratnakumar

    2015-01-01

    The goal of the NASA Advanced Space Power Systems Project is to develop advanced, game changing technologies that will provide future NASA space exploration missions with safe, reliable, light weight and compact power generation and energy storage systems. The development effort is focused on maturing the technologies from a technology readiness level of approximately 23 to approximately 56 as defined in the NASA Procedural Requirement 7123.1B. Currently, the project is working on two critical technology areas: High specific energy batteries, and regenerative fuel cell systems with passive fluid management. Examples of target applications for these technologies are: extending the duration of extravehicular activities (EVA) with high specific energy and energy density batteries; providing reliable, long-life power for rovers with passive fuel cell and regenerative fuel cell systems that enable reduced system complexity. Recent results from the high energy battery and regenerative fuel cell technology development efforts will be presented. The technical approach, the key performance parameters and the technical results achieved to date in each of these new elements will be included. The Advanced Space Power Systems Project is part of the Game Changing Development Program under NASAs Space Technology Mission Directorate.

  16. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  17. System supplier approach to projects and operations efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Moe, P O [Siemens Offshore A/S (Norway)

    1994-12-31

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs.

  18. Generalized projective synchronization between Lorenz system and Chen's system

    International Nuclear Information System (INIS)

    Li Guohui

    2007-01-01

    On the basis of active backstepping design, this paper presents the generalized projective synchronization between two different chaotic systems: Lorenz system and Chen's system. The proposed method combines backstepping methods and active control without having to calculate the Lyapunov exponents and the eigenvalues of the Jacobian matrix, which makes it simple and convenient. Numerical simulations show that this method works very well

  19. I and C systems refurbishment projects for plant life extension

    International Nuclear Information System (INIS)

    Andrashov, A.A.; Sklyar, V.V.; Siora, A.A.

    2012-01-01

    This paper describes the approach to implementation of Nuclear Power Plants (NPPs) Instrumentation and Control (I and C) systems refurbishment projects using Field Programmable Gate Array (FPGA)-based platform. The analysis identifying advantages of refurbishment projects for NPPs is performed. The main goals of the utilities with respect to refurbishment of NPPs I and C systems are outlined. The advantages of FPGA technology application for NPP I and C systems are described. Regulatory framework of FPGA technology for NPPs I and C systems is presented. General principles which may be used for implementation of NPPs I and C system refurbishment projects are presented. The experience of Research and Production Corporation (RPC) Radiy in implementation of NPPs I and C system refurbishment projects is considered. (author)

  20. Extending the GANIL control system for the SPIRAL project

    International Nuclear Information System (INIS)

    Lecorche, E.

    1997-01-01

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author)

  1. Extending the GANIL control system for the SPIRAL project

    Energy Technology Data Exchange (ETDEWEB)

    Lecorche, E

    1997-12-31

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author) 5 refs.

  2. Redefining Project Management Information Systems with New IT Services

    Directory of Open Access Journals (Sweden)

    Luminita Hurbean

    2013-04-01

    Full Text Available Achieving successful adoption of an innovative project management information system should involve influencing the project management environment by providing useful tools, training, reusable templates, techniques, and methods that improve the project manager's ability to successfully execute. This paper suggests that project management practice, enabled by emerging IT, could more explicitly recognize, represent, and manage the interdependencies that are pervasive throughout projects, thereby fully exploiting the potential of the IT to improve overall project performance. The last few years IT&C evolution led to new approaches to application and infrastructure architecture. Breaking from the traditional procedures used by organizations, they propose a cloud operating platform that reduces complexity and improves agility and scalability by altering the approach to the way data centres are built, applications are developed, infrastructure is managed, and organizations align and collaborate. Further, the paper explores the growing impact of mobile computing, cloud delivery and social business collaboration project management information systems and proposes a shift of a Five C’s for information systems in a cloud based operating platform, driven by cooperation, teamwork and continuous improvement.The proposed shift in the cloud indicates actual tools that may be adopted for better collaboration and higher business value of the project information management.

  3. A planning and scheduling system for the LHC project

    CERN Document Server

    Bachy, Gérard; Tarrant, M

    1995-01-01

    The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...

  4. QFD Application to a Software - Intensive System Development Project

    Science.gov (United States)

    Tran, T. L.

    1996-01-01

    This paper describes the use of Quality Function Deployment (QFD), adapted to requirements engineering for a software-intensive system development project, and sysnthesizes the lessons learned from the application of QFD to the Network Control System (NCS) pre-project of the Deep Space Network.

  5. The Analysis of Project Finance: a Case Study of Kazakhstan Caspian Transportation System Project

    OpenAIRE

    Serikbayeva, Aigul

    2011-01-01

    Although project finance is a large and fast growing field in finance, there has been very little academic research in that area. The main reason for this deficit is that it is a relatively new sphere in finance and it is difficult to access the information about the implementation of projects from the companies that implement them. This project will provide an overview of how companies finance large infrastructure projects through a case study of the Kazakhstan Caspian Transportation System ...

  6. Systems Analysis and Design for Decision Support Systems on Economic Feasibility of Projects

    Science.gov (United States)

    Balaji, S. Arun

    2010-11-01

    This paper discuss about need for development of the Decision Support System (DSS) software for economic feasibility of projects in Rwanda, Africa. The various economic theories needed and the corresponding formulae to compute payback period, internal rate of return and benefit cost ratio of projects are clearly given in this paper. This paper is also deals with the systems flow chart to fabricate the system in any higher level computing language. The various input requirements from the projects and the output needed for the decision makers are also included in this paper. The data dictionary used for input and output data structure is also explained.

  7. Fault tree analysis of Project S-4404, Upgrade Canyon Exhaust System

    International Nuclear Information System (INIS)

    Browne, E.V.; Low, J.M.; Lux, C.R.

    1992-01-01

    Project S-4404, Upgrade Canyon Exhaust Systems, is a $177 million project with the purpose of upgrading the Exhaust Systems for both F and H Canyon Facilities. This upgrade will replace major portions of the F and H-Canyon exhaust systems, downstream of their respective sand filters with higher capacity and more reliable systems. Because of the high cost, DOE requested Program Control ampersand Integration (PC ampersand I) to examine specific deletions to the project. PC ampersand I requested Nuclear Processes Safety Research (NPSR) to perform an analysis to compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed exhaust system and specific proposed exhaust system alternatives. The objective of this work was to perform an analysis and compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed project exhaust system and proposed project alternatives. Based on fault tree analysis, two conclusions are made. First, D ampersand D activities can be eliminated from the project with no significant decrease to exhaust system safety. Deletion of D ampersand D activities would result in a cost savings of $29 million. Second, deletion of DOE Order 6430.1A requirements regarding DBAs would decrease exhaust system safety by a factor of 12

  8. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  9. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  10. System engineering and science projects: lessons from MeerKAT

    Science.gov (United States)

    Kapp, Francois

    2016-08-01

    The Square Kilometre Array (SKA) is a large science project planning to commence construction of the world's largest Radio Telescope after 2018. MeerKAT is one of the precursor projects to the SKA, based on the same site that will host the SKA Mid array in the central Karoo area of South Africa. From the perspective of signal processing hardware development, we analyse the challenges that MeerKAT encountered and extrapolate them to SKA in order to prepare the System Engineering and Project Management methods that could contribute to a successful completion of SKA. Using the MeerKAT Digitiser, Correlator/Beamformer and Time and Frequency Reference Systems as an example, we will trace the risk profile and subtle differences in engineering approaches of these systems over time and show the effects of varying levels of System Engineering rigour on the evolution of their risk profiles. It will be shown that the most rigorous application of System Engineering discipline resulted in the most substantial reduction in risk over time. Since the challenges faced by SKA are not limited to that of MeerKAT, we also look into how that translates to a system development where there is substantial complexity in both the created system as well as the creating system. Since the SKA will be designed and constructed by consortia made up from the ten member countries, there are many additional complexities to the organisation creating the system - a challenge the MeerKAT project did not encounter. Factors outside of engineering, for instance procurement models and political interests, also play a more significant role, and add to the project risks of SKA when compared to MeerKAT.

  11. Study of system safety evaluation on LTO of national project. NISA safety research project on system safety of nuclear power plants

    International Nuclear Information System (INIS)

    Takizawa, Masayuki; Sekimura, Naoto; Miyano, Hiroshi; Aoyama, Katsunobu

    2012-01-01

    Japanese safety regulatory body, that is, Nuclear and Industrial Safety Agency (NISA) started a 5-year national safety research project as 'the first stage' from 2006 FY to 2010 FY whose objective is 'Improve the technical information basis in order to utilize knowledge as well as information related to ageing management and maintenance of NPPs. Fukushima disaster happened in March 2011, and the priority of research needs for ageing management dramatically changed in Japan. The second-stage national project started in October 2011 with the concept of 'system safety' of NNPs where not only ageing management on degradation phenomena of important components but also safety management on total plant systems are paid attention to. The second-stage project is so called 'Japanese Ageing Management Program for System Safety (JAMPSS)'. (author)

  12. Analytical simulation platform describing projections in computed tomography systems

    International Nuclear Information System (INIS)

    Youn, Hanbean; Kim, Ho Kyung

    2013-01-01

    To reduce the patient dose, several approaches such as spectral imaging using photon counting detectors and statistical image reconstruction, are being considered. Although image-reconstruction algorithms may significantly enhance image quality in reconstructed images with low dose, true signal-to-noise properties are mainly determined by image quality in projections. We are developing an analytical simulation platform describing projections to investigate how quantum-interaction physics in each component configuring CT systems affect image quality in projections. This simulator will be very useful for an improved design or optimization of CT systems in economy as well as the development of novel image-reconstruction algorithms. In this study, we present the progress of development of the simulation platform with an emphasis on the theoretical framework describing the generation of projection data. We have prepared the analytical simulation platform describing projections in computed tomography systems. The remained further study before the meeting includes the following: Each stage in the cascaded signal-transfer model for obtaining projections will be validated by the Monte Carlo simulations. We will build up energy-dependent scatter and pixel-crosstalk kernels, and show their effects on image quality in projections and reconstructed images. We will investigate the effects of projections obtained from various imaging conditions and system (or detector) operation parameters on reconstructed images. It is challenging to include the interaction physics due to photon-counting detectors into the simulation platform. Detailed descriptions of the simulator will be presented with discussions on its performance and limitation as well as Monte Carlo validations. Computational cost will also be addressed in detail. The proposed method in this study is simple and can be used conveniently in lab environment

  13. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  14. Research on calibration algorithm in laser scanning projection system

    Science.gov (United States)

    Li, Li Juan; Qu, Song; Hou, Mao Sheng

    2017-10-01

    Laser scanning projection technology can project the image defined by the existing CAD digital model to the working surface, in the form of a laser harness profile. This projection is in accordance with the ratio of 1: 1. Through the laser harness contours with high positioning quality, the technical staff can carry out the operation with high precision. In a typical process of the projection, in order to determine the relative positional relationship between the laser projection instrument and the target, it is necessary to place several fixed reference points on the projection target and perform the calibration of projection. This position relationship is the transformation from projection coordinate system to the global coordinate system. The entire projection work is divided into two steps: the first step, the calculation of the projector six position parameters is performed, that is, the projector calibration. In the second step, the deflection angle is calculated by the known projector position parameter and the known coordinate points, and then the actual model is projected. Typically, the calibration requires the establishment of six reference points to reduce the possibility of divergence of the nonlinear equations, but the whole solution is very complex and the solution may still diverge. In this paper, the distance is detected combined with the calculation so that the position parameters of the projector can be solved by using the coordinate values of three reference points and the distance of at least one reference point to the projector. The addition of the distance measurement increases the stability of the solution of the nonlinear system and avoids the problem of divergence of the solution caused by the reference point which is directly under the projector. Through the actual analysis and calculation, the Taylor expansion method combined with the least squares method is used to obtain the solution of the system. Finally, the simulation experiment is

  15. Projective and hybrid projective synchronization for the Lorenz-Stenflo system with estimation of unknown parameters

    International Nuclear Information System (INIS)

    Mukherjee, Payel; Banerjee, Santo

    2010-01-01

    In this work, in the first phase, we study the phenomenon of projective synchronization in the Lorenz-Stenflo system. Synchronization is then investigated for the same system with unknown parameters. We show analytically that synchronization is possible for some proper choice of the nonlinear controller by using a suitable Lyapunov function. With the help of this result, it is also possible to estimate the values of the unknown system parameters. In the second phase as an extension of our analysis, we investigate the new hybrid projective synchronization for the same system. All our analyses are well supported with numerical evidence.

  16. System Design and Engineering, lubricating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    This text book introduces systems engineering for designing systems in multidisciplinary projects. First an overview of the systems engineering process is given. Several systems thinking tracks are presented, to think about the system in a number of ways, its context, its user, its functionality,

  17. White Pine Co. Public School System Biomass Conversion Heating Project

    Energy Technology Data Exchange (ETDEWEB)

    Paul Johnson

    2005-11-01

    The White Pine County School District and the Nevada Division of Forestry agreed to develop a pilot project for Nevada using wood chips to heat the David E. Norman Elementary School in Ely, Nevada. Consideration of the project was triggered by a ''Fuels for Schools'' grant that was brought to the attention of the School District. The biomass project that was part of a district-wide energy retrofit, called for the installation of a biomass heating system for the school, while the current fuel oil system remained as back-up. Woody biomass from forest fuel reduction programs will be the main source of fuel. The heating system as planned and completed consists of a biomass steam boiler, storage facility, and an area for unloading and handling equipment necessary to deliver and load fuel. This was the first project of it's kind in Nevada. The purpose of the DOE funded project was to accomplish the following goals: (1) Fuel Efficiency: Purchase and install a fuel efficient biomass heating system. (2) Demonstration Project: Demonstrate the project and gather data to assist with further research and development of biomass technology; and (3) Education: Educate the White Pine community and others about biomass and other non-fossil fuels.

  18. DOE Heat Pump Centered Integrated Community Energy Systems Project

    Energy Technology Data Exchange (ETDEWEB)

    Calm, J. M.

    1979-01-01

    The Heat Pump Centered Integrated Community Energy Systems (HP-ICES) Project is a multiphase undertaking seeking to demonstrate one or more operational HP-ICES by the end of 1983. The seven phases include System Development, Demonstration Design, Design Completion, HP-ICES Construction, Operation and Data Acquisition, HP-ICES Evaluation, and Upgraded Continuation. This project is sponsored by the Community Systems Branch, Office of Buildings and Community Systems, Assistant Secretary for Conservation and Solar Applicaions, U.S. Department of Energy (DOE). It is part of the Community Systems Program and is managed by the Energy and Environmental Systems Division of Argonne Natinal Laboratory.

  19. Notes on nonlocal projective measurements in relativistic systems

    International Nuclear Information System (INIS)

    Lin, Shih-Yuin

    2014-01-01

    In quantum mechanical bipartite systems, naive extensions of von Neumann’s projective measurement to nonlocal variables can produce superluminal signals and thus violate causality. We analyze the projective quantum nondemolition state-verification in a two-spin system and see how the projection introduces nonlocality without entanglement. For the ideal measurements of “R-nonlocal” variables, we argue that causality violation can be resolved by introducing further restrictions on the post-measurement states, which makes the measurement “Q-nonlocal”. After we generalize these ideas to quantum mechanical harmonic oscillators, we look into the projective measurements of the particle number of a single mode or a wave-packet of a relativistic quantum field in Minkowski space. It turns out that the causality-violating terms in the expectation values of the local operators, generated either by the ideal measurement of the “R-nonlocal” variable or the quantum nondemolition verification of a Fock state, are all suppressed by the IR and UV cutoffs of the theory. Thus relativistic quantum field theories with such projective measurements are effectively causal

  20. Exploration Medical System Demonstration Project

    Science.gov (United States)

    Chin, D. A.; McGrath, T. L.; Reyna, B.; Watkins, S. D.

    2011-01-01

    A near-Earth Asteroid (NEA) mission will present significant new challenges including hazards to crew health created by exploring a beyond low earth orbit destination, traversing the terrain of asteroid surfaces, and the effects of variable gravity environments. Limited communications with ground-based personnel for diagnosis and consultation of medical events require increased crew autonomy when diagnosing conditions, creating treatment plans, and executing procedures. Scope: The Exploration Medical System Demonstration (EMSD) project will be a test bed on the International Space Station (ISS) to show an end-to-end medical system assisting the Crew Medical Officers (CMO) in optimizing medical care delivery and medical data management during a mission. NEA medical care challenges include resource and resupply constraints limiting the extent to which medical conditions can be treated, inability to evacuate to Earth during many mission phases, and rendering of medical care by a non-clinician. The system demonstrates the integration of medical technologies and medical informatics tools for managing evidence and decision making. Project Objectives: The objectives of the EMSD project are to: a) Reduce and possibly eliminate the time required for a crewmember and ground personnel to manage medical data from one application to another. b) Demonstrate crewmember's ability to access medical data/information via a software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities. d) Develop a common data management architecture that allows for scalability, extensibility, and interoperability of data sources and data users. e) Lower total cost of ownership for development and sustainment of peripheral hardware and software that use EMSD for data management f) Provide

  1. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  2. Integrated project management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-01-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK)

  3. Integrated project management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-03-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK).

  4. SE Capstone Project: Building Systems Engineering Education and Workforce Capacity

    Science.gov (United States)

    2012-04-01

    This project developed a system to improve fuel efficiency by means of regenerative braking . The team designed a simple system that allows "bolt-on...air traffic control, social networking, credit/debit cards, and anti-lock brakes are only a few functions enabled by complex systems of systems . We...Building Systems Engineering Education and Workforce Capacity SE Capstone Project APRIL 2012 Report Documentation Page Form ApprovedOMB No. 0704

  5. Technology Investments in the NASA Entry Systems Modeling Project

    Science.gov (United States)

    Barnhardt, Michael; Wright, Michael; Hughes, Monica

    2017-01-01

    The Entry Systems Modeling (ESM) technology development project, initiated in 2012 under NASAs Game Changing Development (GCD) Program, is engaged in maturation of fundamental research developing aerosciences, materials, and integrated systems products for entry, descent, and landing(EDL)technologies [1]. To date, the ESM project has published over 200 papers in these areas, comprising the bulk of NASAs research program for EDL modeling. This presentation will provide an overview of the projects successes and challenges, and an assessment of future investments in EDL modeling and simulation relevant to NASAs mission

  6. System Engineering Management and Implementation Plan for Project W-211, ''Initial Tank Retrieval Systems'' (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211

  7. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    Energy Technology Data Exchange (ETDEWEB)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  8. Project for qualification of the Kozloduy confinement system

    International Nuclear Information System (INIS)

    Montes Rodriguez, J.L.

    1993-01-01

    One of the projects awarded to Empresarios Agrupados within the Six-Month WANO Programme for Kozloduy NPP, financed through the European Community's PHARE Programme, relates to the first tasks of plant confinement system qualification. Development of this project - the results of which will serve as a reference for other power plants with VVER-440/230 models - aroused considerable interest in the Bulgarian nuclear community as well as in international entities which render assistance to Eastern power plants. In fact, this is one of the few projects in the programme which takes into account hardware-oriented activities to be carried out urgently in the plant. The VVER-440/230 confinement system performs functions parallel to the containment system of Western PWR reactors. However, it differs significantly in its criteria and operation details. These important differences form the basis for a rational and prudent application of the essence of Western codes and standards relating to the qualification of these systems. The criteria which are developed to make this application viable constitute the most challenging and, at the same time, most risky part of this job. The project will be in its final stages when the 18th Annual Meeting of the Spanish Nuclear Society is held; it is therefore likely that this paper will advance the results and conclusions expected. (author)

  9. Controlled cooling of an electronic system based on projected conditions

    Science.gov (United States)

    David, Milnes P.; Iyengar, Madhusudan K.; Schmidt, Roger R.

    2015-08-18

    Energy efficient control of a cooling system cooling an electronic system is provided based, in part, on projected conditions. The control includes automatically determining an adjusted control setting(s) for an adjustable cooling component(s) of the cooling system. The automatically determining is based, at least in part, on projected power consumed by the electronic system at a future time and projected temperature at the future time of a heat sink to which heat extracted is rejected. The automatically determining operates to reduce power consumption of the cooling system and/or the electronic system while ensuring that at least one targeted temperature associated with the cooling system or the electronic system is within a desired range. The automatically determining may be based, at least in part, on an experimentally obtained model(s) relating the targeted temperature and power consumption of the adjustable cooling component(s) of the cooling system.

  10. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    International Nuclear Information System (INIS)

    SPENCER, S.G.

    1999-01-01

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates

  11. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    Energy Technology Data Exchange (ETDEWEB)

    SPENCER, S.G.

    1999-04-26

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates.

  12. Modified scaling function projective synchronization of chaotic systems

    International Nuclear Information System (INIS)

    Xu Yu-Hua; Zhou Wu-Neng; Fang Jian-An

    2011-01-01

    This paper investigates a kind of modified scaling function projective synchronization of uncertain chaotic systems using an adaptive controller. The given scaling function in the new method can be an equilibrium point, a periodic orbit, or even a chaotic attractor in the phase space. Based on LaSalle's invariance set principle, the adaptive control law is derived to make the states of two chaotic systems function projective synchronized. Some numerical examples are also given to show the effectiveness of the proposed method. (general)

  13. Boundary Spanning in Offshored Information Systems Development Projects

    Science.gov (United States)

    Krishnan, Poornima

    2010-01-01

    Recent growth in offshore outsourcing of information systems (IS) services is accompanied by managing the offshore projects successfully. Much of the project failures can be attributed to geographic and organizational boundaries which create differences in culture, language, work patterns, and decision making processes among the offshore project…

  14. Development of a database system for near-future climate change projections under the Japanese National Project SI-CAT

    Science.gov (United States)

    Nakagawa, Y.; Kawahara, S.; Araki, F.; Matsuoka, D.; Ishikawa, Y.; Fujita, M.; Sugimoto, S.; Okada, Y.; Kawazoe, S.; Watanabe, S.; Ishii, M.; Mizuta, R.; Murata, A.; Kawase, H.

    2017-12-01

    Analyses of large ensemble data are quite useful in order to produce probabilistic effect projection of climate change. Ensemble data of "+2K future climate simulations" are currently produced by Japanese national project "Social Implementation Program on Climate Change Adaptation Technology (SI-CAT)" as a part of a database for Policy Decision making for Future climate change (d4PDF; Mizuta et al. 2016) produced by Program for Risk Information on Climate Change. Those data consist of global warming simulations and regional downscaling simulations. Considering that those data volumes are too large (a few petabyte) to download to a local computer of users, a user-friendly system is required to search and download data which satisfy requests of the users. We develop "a database system for near-future climate change projections" for providing functions to find necessary data for the users under SI-CAT. The database system for near-future climate change projections mainly consists of a relational database, a data download function and user interface. The relational database using PostgreSQL is a key function among them. Temporally and spatially compressed data are registered on the relational database. As a first step, we develop the relational database for precipitation, temperature and track data of typhoon according to requests by SI-CAT members. The data download function using Open-source Project for a Network Data Access Protocol (OPeNDAP) provides a function to download temporally and spatially extracted data based on search results obtained by the relational database. We also develop the web-based user interface for using the relational database and the data download function. A prototype of the database system for near-future climate change projections are currently in operational test on our local server. The database system for near-future climate change projections will be released on Data Integration and Analysis System Program (DIAS) in fiscal year 2017

  15. Understanding large social-ecological systems: introducing the SESMAD project

    Directory of Open Access Journals (Sweden)

    Michael Cox

    2014-08-01

    Full Text Available This article introduces the Social-ecological systems meta-analysis database (SESMAD project, which is the project behind the case studies and synthetic articles contained in this special issue of the International Journal of the Commons. SESMAD is an internationally collaborative meta-analysis project that builds on previous seminally synthetic work on small-scale common-pool resource systems conducted at the Workshop in Political Theory and Policy Analysis at Indiana University. This project is guided by the following research question: can the variables found to be important in explaining outcomes on small-scale systems be scaled up to explain outcomes in large-scale environmental governance? In this special issue we report on our findings thus far through a set of case studies of large-scale environmental governance, a paper that describes our conceptual advances, and a paper that compares these five case studies to further examine our central research question.

  16. IAEA safeguards information system re-engineering project (IRP)

    International Nuclear Information System (INIS)

    Whitaker, G.; Becar, J.-M.; Ifyland, N.; Kirkgoeze, R.; Koevesd, G.; Szamosi, L.

    2007-01-01

    The Safeguards Information System Re-engineering Project (IRP) was initiated to assist the IAEA in addressing current and future verification and analysis activities through the establishment of a new information technology framework for strengthened and integrated safeguards. The Project provides a unique opportunity to enhance all of the information services for the Department of Safeguards and will require project management 'best practices' to balance limited funds, available resources and Departmental priorities. To achieve its goals, the Project will require the participation of all stakeholders to create a comprehensive and cohesive plan that provides both a flexible and stable foundation for address changing business needs. The expectation is that high quality integrated information systems will be developed that incorporate state-of-the-art technical architectural standards, improved business processes and consistent user interfaces to store various data types in an enterprise data repository which is accessible on-line in a secure environment. (author)

  17. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    DEFF Research Database (Denmark)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara

    2017-01-01

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity ...

  18. Adaptive projective synchronization of different chaotic systems with nonlinearity inputs

    International Nuclear Information System (INIS)

    Niu Yu-Jun; Pei Bing-Nan; Wang Xing-Yuan

    2012-01-01

    We investigate the projective synchronization of different chaotic systems with nonlinearity inputs. Based on the adaptive technique, sliding mode control method and pole assignment technique, a novel adaptive projective synchronization scheme is proposed to ensure the drive system and the response system with nonlinearity inputs can be rapidly synchronized up to the given scaling factor. (general)

  19. Systems design and engineering : facilitating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    2016-01-01

    As its name implies, the aim of Systems Design and Engineering: Facilitating Multidisciplinary Development Projects is to help systems engineers develop the skills and thought processes needed to successfully develop and implement engineered systems. Such expertise typically does not come through

  20. The Workplace Literacy System Project (WLS). Final Performance Report.

    Science.gov (United States)

    Poulton, Bruce R.

    The Workplace Literacy System Project (WLS) prepared interactive CD-ROM discs containing about 50 hours of instruction and drill in basic skills presented within the context of the textile/apparel manufacturing industry. The project was conducted at a Sara Lee knit products plant in North Carolina. During the project, literacy task analyses were…

  1. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  2. The Food Early Warning System Project in Somalia

    Directory of Open Access Journals (Sweden)

    Leblanc, M.

    1992-01-01

    Full Text Available The article describes shortly the objectives of a Food Early Warning System (FEWS project, as well as its organisation. The specifie case of Somalia, where the project had to evolve in increasingly difficult situations, and the solutions used so as to preserve the output, are described.

  3. DEVELOPMENT OF A METADATA MANAGEMENT SYSTEM FOR AN INTERDISCIPLINARY RESEARCH PROJECT

    Directory of Open Access Journals (Sweden)

    C. Curdt

    2012-07-01

    Full Text Available In every interdisciplinary, long-term research project it is essential to manage and archive all heterogeneous research data, produced by the project participants during the project funding. This has to include sustainable storage, description with metadata, easy and secure provision, back up, and visualisation of all data. To ensure the accurate description of all project data with corresponding metadata, the design and implementation of a metadata management system is a significant duty. Thus, the sustainable use and search of all research results during and after the end of the project is particularly dependent on the implementation of a metadata management system. Therefore, this paper will describe the practical experiences gained during the development of a scientific research data management system (called the TR32DB including the corresponding metadata management system for the multidisciplinary research project Transregional Collaborative Research Centre 32 (CRC/TR32 'Patterns in Soil-Vegetation-Atmosphere Systems'. The entire system was developed according to the requirements of the funding agency, the user and project requirements, as well as according to recent standards and principles. The TR32DB is basically a combination of data storage, database, and web-interface. The metadata management system was designed, realized, and implemented to describe and access all project data via accurate metadata. Since the quantity and sort of descriptive metadata depends on the kind of data, a user-friendly multi-level approach was chosen to cover these requirements. Thus, the self-developed CRC/TR32 metadata framework is designed. It is a combination of general, CRC/TR32 specific, as well as data type specific properties.

  4. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    NARCIS (Netherlands)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara; Hill, Samantha L L; Lysenko, Igor; De Palma, Adriana; Phillips, Helen R P; Alhusseini, Tamera I; Bedford, Felicity E; Bennett, Dominic J; Booth, Hollie; Burton, Victoria J; Chng, Charlotte W T; Choimes, Argyrios; Correia, David L P; Day, Julie; Echeverría-Londoño, Susy; Emerson, Susan R; Gao, Di; Garon, Morgan; Harrison, Michelle L K; Ingram, Daniel J; Jung, Martin; Kemp, Victoria; Kirkpatrick, Lucinda; Martin, Callum D; Pan, Yuan; Pask-Hale, Gwilym D; Pynegar, Edwin L; Robinson, Alexandra N; Sanchez-Ortiz, Katia; Senior, Rebecca A; Simmons, Benno I; White, Hannah J; Zhang, Hanbin; Aben, Job; Abrahamczyk, Stefan; Adum, Gilbert B; Aguilar-Barquero, Virginia; Aizen, Marcelo A; Albertos, Belén; Alcala, E L; Del Mar Alguacil, Maria; Alignier, Audrey; Ancrenaz, Marc; Andersen, Alan N; Arbeláez-Cortés, Enrique; Armbrecht, Inge; Arroyo-Rodríguez, Víctor; Aumann, Tom; Axmacher, Jan C; Azhar, Badrul; Azpiroz, Adrián B; Baeten, Lander; Bakayoko, Adama; Báldi, András; Banks, John E; Baral, Sharad K; Barlow, Jos; Barratt, Barbara I P; Barrico, Lurdes; Bartolommei, Paola; Barton, Diane M; Basset, Yves; Batáry, Péter; Bates, Adam J; Baur, Bruno; Bayne, Erin M; Beja, Pedro; Benedick, Suzan; Berg, Åke; Bernard, Henry; Berry, Nicholas J; Bhatt, Dinesh; Bicknell, Jake E; Bihn, Jochen H; Blake, Robin J; Bobo, Kadiri S; Bóçon, Roberto; Boekhout, Teun; Böhning-Gaese, Katrin; Bonham, Kevin J; Borges, Paulo A V; Borges, Sérgio H; Boutin, Céline; Bouyer, Jérémy; Bragagnolo, Cibele; Brandt, Jodi S; Brearley, Francis Q; Brito, Isabel; Bros, Vicenç; Brunet, Jörg; Buczkowski, Grzegorz; Buddle, Christopher M; Bugter, Rob; Buscardo, Erika; Buse, Jörn; Cabra-García, Jimmy; Cáceres, Nilton C; Cagle, Nicolette L; Calviño-Cancela, María; Cameron, Sydney A; Cancello, Eliana M; Caparrós, Rut; Cardoso, Pedro; Carpenter, Dan; Carrijo, Tiago F; Carvalho, Anelena L; Cassano, Camila R; Castro, Helena; Castro-Luna, Alejandro A; Rolando, Cerda B; Cerezo, Alexis; Chapman, Kim Alan; Chauvat, Matthieu; Christensen, Morten; Clarke, Francis M; Cleary, Daniel F R; Colombo, Giorgio; Connop, Stuart P; Craig, Michael D; Cruz-López, Leopoldo; Cunningham, Saul A; D'Aniello, Biagio; D'Cruze, Neil; da Silva, Pedro Giovâni; Dallimer, Martin; Danquah, Emmanuel; Darvill, Ben; Dauber, Jens; Davis, Adrian L V; Dawson, Jeff; de Sassi, Claudio; de Thoisy, Benoit; Deheuvels, Olivier; Dejean, Alain; Devineau, Jean-Louis; Diekötter, Tim; Dolia, Jignasu V; Domínguez, Erwin; Dominguez-Haydar, Yamileth; Dorn, Silvia; Draper, Isabel; Dreber, Niels; Dumont, Bertrand; Dures, Simon G; Dynesius, Mats; Edenius, Lars; Eggleton, Paul; Eigenbrod, Felix; Elek, Zoltán; Entling, Martin H; Esler, Karen J; de Lima, Ricardo F; Faruk, Aisyah; Farwig, Nina; Fayle, Tom M; Felicioli, Antonio; Felton, Annika M; Fensham, Roderick J; Fernandez, Ignacio C; Ferreira, Catarina C; Ficetola, Gentile F; Fiera, Cristina; Filgueiras, Bruno K C; Fırıncıoğlu, Hüseyin K; Flaspohler, David; Floren, Andreas; Fonte, Steven J; Fournier, Anne; Fowler, Robert E; Franzén, Markus; Fraser, Lauchlan H; Fredriksson, Gabriella M; Freire, Geraldo B; Frizzo, Tiago L M; Fukuda, Daisuke; Furlani, Dario; Gaigher, René; Ganzhorn, Jörg U; García, Karla P; Garcia-R, Juan C; Garden, Jenni G; Garilleti, Ricardo; Ge, Bao-Ming; Gendreau-Berthiaume, Benoit; Gerard, Philippa J; Gheler-Costa, Carla; Gilbert, Benjamin; Giordani, Paolo; Giordano, Simonetta; Golodets, Carly; Gomes, Laurens G L; Gould, Rachelle K; Goulson, Dave; Gove, Aaron D; Granjon, Laurent; Grass, Ingo; Gray, Claudia L; Grogan, James; Gu, Weibin; Guardiola, Moisès; Gunawardene, Nihara R; Gutierrez, Alvaro G; Gutiérrez-Lamus, Doris L; Haarmeyer, Daniela H; Hanley, Mick E; Hanson, Thor; Hashim, Nor R; Hassan, Shombe N; Hatfield, Richard G; Hawes, Joseph E; Hayward, Matt W; Hébert, Christian; Helden, Alvin J; Henden, John-André; Henschel, Philipp; Hernández, Lionel; Herrera, James P; Herrmann, Farina; Herzog, Felix; Higuera-Diaz, Diego; Hilje, Branko; Höfer, Hubert; Hoffmann, Anke; Horgan, Finbarr G; Hornung, Elisabeth; Horváth, Roland; Hylander, Kristoffer; Isaacs-Cubides, Paola; Ishida, Hiroaki; Ishitani, Masahiro; Jacobs, Carmen T; Jaramillo, Víctor J; Jauker, Birgit; Hernández, F Jiménez; Johnson, McKenzie F; Jolli, Virat; Jonsell, Mats; Juliani, S Nur; Jung, Thomas S; Kapoor, Vena; Kappes, Heike; Kati, Vassiliki; Katovai, Eric; Kellner, Klaus; Kessler, Michael; Kirby, Kathryn R; Kittle, Andrew M; Knight, Mairi E; Knop, Eva; Kohler, Florian; Koivula, Matti; Kolb, Annette; Kone, Mouhamadou; Kőrösi, Ádám; Krauss, Jochen; Kumar, Ajith; Kumar, Raman; Kurz, David J; Kutt, Alex S; Lachat, Thibault; Lantschner, Victoria; Lara, Francisco; Lasky, Jesse R; Latta, Steven C; Laurance, William F; Lavelle, Patrick; Le Féon, Violette; LeBuhn, Gretchen; Légaré, Jean-Philippe; Lehouck, Valérie; Lencinas, María V; Lentini, Pia E; Letcher, Susan G; Li, Qi; Litchwark, Simon A; Littlewood, Nick A; Liu, Yunhui; Lo-Man-Hung, Nancy; López-Quintero, Carlos A; Louhaichi, Mounir; Lövei, Gabor L; Lucas-Borja, Manuel Esteban; Luja, Victor H; Luskin, Matthew S; MacSwiney G, M Cristina; Maeto, Kaoru; Magura, Tibor; Mallari, Neil Aldrin; Malone, Louise A; Malonza, Patrick K; Malumbres-Olarte, Jagoba; Mandujano, Salvador; Måren, Inger E; Marin-Spiotta, Erika; Marsh, Charles J; Marshall, E J P; Martínez, Eliana; Martínez Pastur, Guillermo; Moreno Mateos, David; Mayfield, Margaret M; Mazimpaka, Vicente; McCarthy, Jennifer L; McCarthy, Kyle P; McFrederick, Quinn S; McNamara, Sean; Medina, Nagore G; Medina, Rafael; Mena, Jose L; Mico, Estefania; Mikusinski, Grzegorz; Milder, Jeffrey C; Miller, James R; Miranda-Esquivel, Daniel R; Moir, Melinda L; Morales, Carolina L; Muchane, Mary N; Muchane, Muchai; Mudri-Stojnic, Sonja; Munira, A Nur; Muoñz-Alonso, Antonio; Munyekenye, B F; Naidoo, Robin; Naithani, A; Nakagawa, Michiko; Nakamura, Akihiro; Nakashima, Yoshihiro; Naoe, Shoji; Nates-Parra, Guiomar; Navarrete Gutierrez, Dario A; Navarro-Iriarte, Luis; Ndang'ang'a, Paul K; Neuschulz, Eike L; Ngai, Jacqueline T; Nicolas, Violaine; Nilsson, Sven G; Noreika, Norbertas; Norfolk, Olivia; Noriega, Jorge Ari; Norton, David A; Nöske, Nicole M; Nowakowski, A Justin; Numa, Catherine; O'Dea, Niall; O'Farrell, Patrick J; Oduro, William; Oertli, Sabine; Ofori-Boateng, Caleb; Oke, Christopher Omamoke; Oostra, Vicencio; Osgathorpe, Lynne M; Otavo, Samuel Eduardo; Page, Navendu V; Paritsis, Juan; Parra-H, Alejandro; Parry, Luke; Pe'er, Guy; Pearman, Peter B; Pelegrin, Nicolás; Pélissier, Raphaël; Peres, Carlos A; Peri, Pablo L; Persson, Anna S; Petanidou, Theodora; Peters, Marcell K; Pethiyagoda, Rohan S; Phalan, Ben; Philips, T Keith; Pillsbury, Finn C; Pincheira-Ulbrich, Jimmy; Pineda, Eduardo; Pino, Joan; Pizarro-Araya, Jaime; Plumptre, A J; Poggio, Santiago L; Politi, Natalia; Pons, Pere; Poveda, Katja; Power, Eileen F; Presley, Steven J; Proença, Vânia; Quaranta, Marino; Quintero, Carolina; Rader, Romina; Ramesh, B R; Ramirez-Pinilla, Martha P; Ranganathan, Jai; Rasmussen, Claus; Redpath-Downing, Nicola A; Reid, J Leighton; Reis, Yana T; Rey Benayas, José M; Rey-Velasco, Juan Carlos; Reynolds, Chevonne; Ribeiro, Danilo Bandini; Richards, Miriam H; Richardson, Barbara A; Richardson, Michael J; Ríos, Rodrigo Macip; Robinson, Richard; Robles, Carolina A; Römbke, Jörg; Romero-Duque, Luz Piedad; Rös, Matthias; Rosselli, Loreta; Rossiter, Stephen J; Roth, Dana S; Roulston, T'ai H; Rousseau, Laurent; Rubio, André V; Ruel, Jean-Claude; Sadler, Jonathan P; Sáfián, Szabolcs; Saldaña-Vázquez, Romeo A; Sam, Katerina; Samnegård, Ulrika; Santana, Joana; Santos, Xavier; Savage, Jade; Schellhorn, Nancy A; Schilthuizen, Menno; Schmiedel, Ute; Schmitt, Christine B; Schon, Nicole L; Schüepp, Christof; Schumann, Katharina; Schweiger, Oliver; Scott, Dawn M; Scott, Kenneth A; Sedlock, Jodi L; Seefeldt, Steven S; Shahabuddin, Ghazala; Shannon, Graeme; Sheil, Douglas; Sheldon, Frederick H; Shochat, Eyal; Siebert, Stefan J; Silva, Fernando A B; Simonetti, Javier A; Slade, Eleanor M; Smith, Jo; Smith-Pardo, Allan H; Sodhi, Navjot S; Somarriba, Eduardo J; Sosa, Ramón A; Soto Quiroga, Grimaldo; St-Laurent, Martin-Hugues; Starzomski, Brian M; Stefanescu, Constanti; Steffan-Dewenter, Ingolf; Stouffer, Philip C; Stout, Jane C; Strauch, Ayron M; Struebig, Matthew J; Su, Zhimin; Suarez-Rubio, Marcela; Sugiura, Shinji; Summerville, Keith S; Sung, Yik-Hei; Sutrisno, Hari; Svenning, Jens-Christian; Teder, Tiit; Threlfall, Caragh G; Tiitsaar, Anu; Todd, Jacqui H; Tonietto, Rebecca K; Torre, Ignasi; Tóthmérész, Béla; Tscharntke, Teja; Turner, Edgar C; Tylianakis, Jason M; Uehara-Prado, Marcio; Urbina-Cardona, Nicolas; Vallan, Denis; Vanbergen, Adam J; Vasconcelos, Heraldo L; Vassilev, Kiril; Verboven, Hans A F; Verdasca, Maria João; Verdú, José R; Vergara, Carlos H; Vergara, Pablo M; Verhulst, Jort; Virgilio, Massimiliano; Vu, Lien Van; Waite, Edward M; Walker, Tony R; Wang, Hua-Feng; Wang, Yanping; Watling, James I; Weller, Britta; Wells, Konstans; Westphal, Catrin; Wiafe, Edward D; Williams, Christopher D; Willig, Michael R; Woinarski, John C Z; Wolf, Jan H D; Wolters, Volkmar; Woodcock, Ben A; Wu, Jihua; Wunderle, Joseph M; Yamaura, Yuichi; Yoshikura, Satoko; Yu, Douglas W; Zaitsev, Andrey S; Zeidler, Juliane; Zou, Fasheng; Collen, Ben; Ewers, Rob M; Mace, Georgina M; Purves, Drew W; Scharlemann, Jörn P W; Purvis, Andy

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of

  5. Project Delivery System Mode Decision Based on Uncertain AHP and Fuzzy Sets

    Science.gov (United States)

    Kaishan, Liu; Huimin, Li

    2017-12-01

    The project delivery system mode determines the contract pricing type, project management mode and the risk allocation among all participants. Different project delivery system modes have different characteristics and applicable scope. For the owners, the selection of the delivery mode is the key point to decide whether the project can achieve the expected benefits, it relates to the success or failure of project construction. Under the precondition of comprehensively considering the influence factors of the delivery mode, the model of project delivery system mode decision was set up on the basis of uncertain AHP and fuzzy sets, which can well consider the uncertainty and fuzziness when conducting the index evaluation and weight confirmation, so as to rapidly and effectively identify the most suitable delivery mode according to project characteristics. The effectiveness of the model has been verified via the actual case analysis in order to provide reference for the construction project delivery system mode.

  6. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    OpenAIRE

    Богдан Владимирович ГАЙДАБРУС; Евгений Анатольевич ДРУЖИНИН

    2015-01-01

    Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  7. The use of intelligent systems for risk management in software projects

    Directory of Open Access Journals (Sweden)

    Oksana A. Gushchina

    2017-06-01

    Full Text Available Introduction: The article identifies the main risks of a software project, examines the use of different types of intelligent systems in the risk management process for software projects, discusses the basic methods used for process estimation and forecasting in the field of software engineering, identifies currently used empty expert systems, software systems for analysis and risk management of software projects. Materials and Methods: The author describes the peculiarities of risk management in the field of software engineering with involvement of intelligent systems. The intelligent techniques allow solving the control task with expert precision without the involvement of human experts. Results: The result of this work: – identification of the key risks of a software project (tax, legal, financial and commercial risks, IT risks, personnel risks, risks related to competitors, suppliers, marketing and demand and market; – investigation of the current, applied to risk management of software system projects, artificial intelligence, particularly expert systems and software tools for evaluation of the process results; – identification of the most popular empty expert systems (Clips, G2 and Leonardo and software products of the analysis of large databases (Orange, Weka, Rattle GUI, Apache Mahout, SCaViS, RapidMiner, Databionic ESOM Tools, ELKI, KNIME, Pandas and UIMA; – consideration of the cluster, correlation, regression, factor and dispersion analysis methods for the estimation and prediction of the processes of software engineering. Discussion and Conclusions: The results show the feasibility of the application of various intelligent systems in the risk management process. The analysis of methods of evaluating risks and the tendency of their application in the modern systems of intellectual analysis can serve as a start point for creating a unified system of risk management for software projects of medium and high complexity with a

  8. Implementing Effective Mission Systems Engineering Practices During Early Project Formulation Phases

    Science.gov (United States)

    Moton, Tryshanda

    2016-01-01

    Developing and implementing a plan for a NASA space mission can be a complicated process. The needs, goals, and objectives of any proposed mission or technology must be assessed early in the Project Life Cycle. The key to successful development of a space mission or flight project is the inclusion of systems engineering in early project formulation, namely during Pre-phase A, Phase A, and Phase B of the NASA Project Life Cycle. When a space mission or new technology is in pre-development, or "pre-Formulation", feasibility must be determined based on cost, schedule, and risk. Inclusion of system engineering during project formulation is key because in addition to assessing feasibility, design concepts are developed and alternatives to design concepts are evaluated. Lack of systems engineering involvement early in the project formulation can result in increased risks later in the implementation and operations phases of the project. One proven method for effective systems engineering practice during the pre-Formulation Phase is the use of a mission conceptual design or technology development laboratory, such as the Mission Design Lab (MDL) at NASA's Goddard Space Flight Center (GSFC). This paper will review the engineering process practiced routinely in the MDL for successful mission or project development during the pre-Formulation Phase.

  9. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  10. How can innovative project delivery systems improve the overall efficiency of GDOT in transportation project delivery?

    Science.gov (United States)

    2013-04-01

    The USDOT and Federal Highway Administration (FHWA) recommend the smart use of innovative project : delivery systems, such as design-build, to improve efficiency and effectiveness of developing transportation : projects. Although design-build provide...

  11. System engineering at the MEGARA project

    Science.gov (United States)

    Pérez-Calpena, A.; García-Vargas, María. Luisa; Gil de Paz, A.; Gallego Maestro, J.; Carrasco Licea, E.; Sánchez Moreno, F.; Iglesias-Páramo, J.

    2014-08-01

    MEGARA (Multi-Espectrógrafo en GTC de Alta Resolución para Astronomía) is a facility instrument of the 10.4m GTC (La Palma, Spain) working at optical wavelengths that provides both Integral-Field Unit (IFU) and Multi- Object Spectrograph (MOS) capabilities at resolutions in the range R=6,000-20,000. The MEGARA focal plane subsystems are located at one of the GTC focal stations, while the MEGARA refractive VPH based spectrograph is located at one of the Nasmyth platforms. The fiber bundles conduct the light from the focal plane subsystems to the pseudo-slits at the entrance of the spectrograph. The project is an initiative led by Universidad Complutense de Madrid (Spain) in collaboration with INAOE (Mexico), IAA-CSIC (Spain) and Universidad Politécnica de Madrid (Spain) and is developed under contract with GRANTECAN. The project is carried out by a multidisciplinary and geographically distributed team, which includes the in-kind contributions of the project partners and personnel from several private companies. The MEGARA system-engineering plan has been tailored to the project and is being applied to ensure the technical control of the project in order to finally meet the science high-level requirements and GTC constrains.

  12. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Богдан Владимирович ГАЙДАБРУС

    2015-05-01

    Full Text Available Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  13. A feeling for Systems Development Work - Design of the ROSA project

    DEFF Research Database (Denmark)

    Bødker, Susanne; Greenbaum, Joan

    1988-01-01

    This article is based on the design of a research project that will look at intuition, learning processes, language and roles in the development of computer systems. The research project, called ROSA (a Danish acronym for Roles and Cooperation in Systems Development) grew out of our interest...... in the informal working practices among systems developers, because it is these informal working relationships that are most often overlooked in research about computer science methods and tools. The project applies a gender perspective to look at the informal work relations of systems developers. The concept...

  14. Advanced Hard Real-Time Operating System, The Maruti Project. Part 1.

    Science.gov (United States)

    1997-01-01

    REAL - TIME OPERATING SYSTEM , THE MARUTI PROJECT Part 1 of 2 Ashok K. Agrawala Satish K. Tripathi Department of Computer Science University of Maryland...Hard Real - Time Operating System , The Maruti Project DASG-60-92-C-0055 5b. Program Element # 62301E 6. Author(s) 5c. Project # DRPB Ashok K. Agrawala...SdSA94), a real - time operating system developed at the I3nversity of Maryland, and conducted extensive experiments under various task

  15. Robust function projective synchronization of a class of uncertain chaotic systems

    International Nuclear Information System (INIS)

    Shen Liqun; Liu Wanyu; Ma Jianwei

    2009-01-01

    In this paper, the function projective synchronization problem of chaotic systems is investigated, where parameter mismatch exists between the drive system and the response system. Based on Lyapunov stability theory, a novel robust function projective synchronization scheme is proposed. And the parameter mismatch problem is also solved. Simulation results of Lorenz system and Chen system verify the effectiveness of the proposed control scheme.

  16. Implementing information systems with project teams using ethnographic-action research

    NARCIS (Netherlands)

    Hartmann, Timo; Fischer, Martin; Haymaker, John

    2009-01-01

    Architecture, engineering, and construction (AEC) projects are characterized by a large variation in requirements and work routines. Therefore, it is difficult to develop and implement information systems to support projects. To address these challenges, this paper presents a project-centric

  17. Function Projective Synchronization of Two Identical New Hyperchaotic Systems

    International Nuclear Information System (INIS)

    Li Xin; Chen Yong

    2007-01-01

    A function projective synchronization of two identical hyperchaotic systems is defined and the theorem of sufficient condition is given. Based on the active control method and symbolic computation Maple, the scheme of function projective synchronization is developed to synchronize the two identical new hyperchaotic systems constructed by Yan up to a scaling function matrix with different initial values. Numerical simulations are used to verify the effectiveness of the scheme.

  18. Full state hybrid projective synchronization in hyperchaotic systems

    International Nuclear Information System (INIS)

    Chu Yandong; Chang Yingxiang; Zhang Jiangang; Li Xianfeng; An Xinlei

    2009-01-01

    In this letter, we investigate the full state hybrid projective synchronization (FSHPS) which includes complete synchronization, anti-synchronization and projective synchronization as its special items. Based on Lyapunov stability theory a controller can be designed for achieving the FSHPS of hyperchaotic systems. Numerical simulations are provided to verify the effectiveness of the proposed scheme.

  19. Systems engineering management plan for the Salt Repository Project

    International Nuclear Information System (INIS)

    Neff, J.O.

    1986-08-01

    This document presents the plan for using systems engineering in conducting and managing the technical work of the Salt Repository Project (SRP) of the US Department of Energy's Civilian Radioactive Waste Management Program. The need for preparing a Systems Engineering Management Plan (SEMP) is traced back to relevant DOE directives. These directives are interpreted as SRP requirements in the context of the Mined Geologic Disposal System. The strategy for conducting systems engineering on the SRP, including the role of the systems engineering process, is then described. The SEMP also designates who in the project organization will be responsible for carrying out the activities. Finally, the management tools that are used to implement the systems engineering process, including associated documentation on the SRP, are described

  20. The UK Earth System Model project

    Science.gov (United States)

    Tang, Yongming

    2016-04-01

    In this talk we will describe the development and current status of the UK Earth System Model (UKESM). This project is a NERC/Met Office collaboration and has two objectives; to develop and apply a world-leading Earth System Model, and to grow a community of UK Earth System Model scientists. We are building numerical models that include all the key components of the global climate system, and contain the important process interactions between global biogeochemistry, atmospheric chemistry and the physical climate system. UKESM will be used to make key CMIP6 simulations as well as long-time (e.g. millennium) simulations, large ensemble experiments and investigating a range of future carbon emission scenarios.

  1. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  2. NASA UAS Integration into the NAS Project: Human Systems Integration

    Science.gov (United States)

    Shively, Jay

    2016-01-01

    This presentation provides an overview of the work the Human Systems Integration (HSI) sub-project has done on detect and avoid (DAA) displays while working on the UAS (Unmanned Aircraft System) Integration into the NAS project. The most recent simulation on DAA interoperability with Traffic Collision Avoidance System (TCAS) is discussed in the most detail. The relationship of the work to the larger UAS community and next steps are also detailed.

  3. Major Components of the National TRU Waste System Optimization Project

    International Nuclear Information System (INIS)

    Moody, D.C.; Bennington, B.; Sharif, F.

    2002-01-01

    The National Transuranic (TRU) Program (NTP) is being optimized to allow for disposing of the legacy TRU waste at least 10 years earlier than originally planned. This acceleration will save the nation an estimated $713. The Department of Energy's (DOE'S) Carlsbad Field Office (CBFO) has initiated the National TRU Waste System Optimization Project to propose, and upon approvaI, implement activities that produce significant cost saving by improving efficiency, thereby accelerating the rate of TRU waste disposal without compromising safety. In its role as NTP agent of change, the National TRU Waste System Optimization Project (the Project) (1) interacts closely with all NTP activities. Three of the major components of the Project are the Central Characterization Project (CCP), the Central Confirmation Facility (CCF), and the MobiIe/Modular Deployment Program.

  4. RISK MANAGEMENT IN A LARGE-SCALE NEW RAILWAY TRANSPORT SYSTEM PROJECT

    Directory of Open Access Journals (Sweden)

    Sunduck D. SUH, Ph.D., P.E.

    2000-01-01

    Full Text Available Risk management experiences of the Korean Seoul-Pusan high-speed railway (KTX project since the planning stage are evaluated. One can clearly see the interplay of engineering and construction risks, financial risks and political risks in the development of the KTX project, which is the peculiarity of large-scale new railway system projects. A brief description on evaluation methodology and overview of the project is followed by detailed evaluations on key differences in risks between conventional railway system and high-speed railway system, social and political risks, engineering and construction risks, and financial risks. Risks involved in system procurement process, such as proposal solicitation, evaluation, selection, and scope of solicitation are separated out and evaluated in depth. Detailed events resulting from these issues are discussed along with their possible impact on system risk. Lessons learned and further possible refinements are also discussed.

  5. RF Phase Reference Distribution System for the TESLA Technology Based Projects

    CERN Document Server

    Czuba, K; Romaniuk, R S

    2013-01-01

    Since many decades physicists have been building particle accelerators and usually new projects became more advanced, more complicated and larger than predecessors. The importance and complexity of the phase reference distribution systems used in these accelerators have grown significantly during recent years. Amongst the most advanced of currently developed accelerators are projects based on the TESLA technology. These projects require synchronization of many RF devices with accuracy reaching femtosecond levels over kilometre distances. Design of a phase reference distribution system fulfilling such requirements is a challenging scientific task. There are many interdisciplinary problems which must be solved during the system design. Many, usually negligible issues, may became very important in such system. Furthermore, the design of a distribution system on a scale required for the TESLA technology based projects is a new challenge and there is almost no literature sufficiently covering this subject. This th...

  6. Sources of project financing in health care systems.

    Science.gov (United States)

    Smith, D G; Wheeler, J R; Rivenson, H L; Reiter, K L

    2000-01-01

    Through discussions with chief financial officers of leading health care systems, insights are offered on preferences for project financing and development efforts. Data from these same systems provide at least anecdotal evidence in support of pecking-order theory.

  7. Development of a website and an information system for an European R&D project : the example of the STRATFEED project

    Directory of Open Access Journals (Sweden)

    Baeten V.

    2003-01-01

    Full Text Available The multidisciplinary nature, the international partnership and the large amount of information to be managed in an European project such as STRATFEED, require the development of an information management system. Within the framework of this project, the development of the Internet-oriented computer system required three facets: the data and information collection, the database building and the development of different applications. A tool for the dissemination of results (STRATFEED website with both a public part and a confidential part, a tool for data management (STRATFEED manager, a tool for data queries (STRATFEED explorer and two tools for decision-making (ARIES Decision Support System –– CD-Rom release and STRATFEED Decision Support System – Internet release were developed. The modular concept, which relates to the different topics of the project, facilitates the updating and development of a system according to research progress and user needs. The concept developed for this project can be used for any other project and can easily be adapted to meet new requirements. The example of the STRATFEED project can be accessed at: http://stratfeed.cra.wallonie.be

  8. Generalized projective synchronization of a unified chaotic system

    International Nuclear Information System (INIS)

    Yan Jianping; Li Changpin

    2005-01-01

    In the present paper, a simple but efficient control technique of the generalized projective synchronization is applied to a unified chaotic system. Numerical simulations show that this method works very well, which can also be applied to other chaotic systems

  9. Bug tracking and project management system application in an electronic design company

    Directory of Open Access Journals (Sweden)

    Sadık ARSLAN

    2016-05-01

    Full Text Available In this study, commercially available Bug Tracking and Management Information Systems has been investigated in a comprehensive manner. The systems that commonly used described in detail. Bug Tracking and Project Management Systems requirements analysis of medium-sized companies and Kentkart Ege Electronic which is an Information Technology company has been made. Obtained by the analysis requirements, the appropriate tools are selected for system application. JIRA that a product of Atlassian company was determined as a Bug Tracking and Project Management application tool. In this study, JIRA system adapted to the requirements, Bug Tracking and Project Management systems is designed in a structure which can be easily used by R&D employees. Cost-Benefit analysis is done and using this project was determined to be quite useful.

  10. Liquidus Projection and Thermodynamic Modeling of a Sn-Ag-Zn System

    Science.gov (United States)

    Chen, Sinn-wen; Chiu, Wan-ting; Gierlotka, Wojciech; Chang, Jui-shen; Wang, Chao-hong

    2017-12-01

    Sn-Ag-Zn alloys are promising Pb-free solders. In this study, the Sn-Ag-Zn liquidus projection was determined, and the Sn-Ag-Zn thermodynamic modeling was developed. Various Sn-Ag-Zn alloys were prepared. Their as-cast microstructures and primary solidification phases were examined. The invariant reaction temperatures of the ternary Sn-Ag-Zn system were determined. The liquidus projection of the Sn-Ag-Zn ternary system was constructed. It was found that the Sn-Ag-Zn ternary system has eight primary solidification phases: ɛ2-AgZn3, γ-Ag5Zn8, β-AgZn, ζ-Ag4Sn, (Ag), ɛ1-Ag3Sn, β-(Sn) and (Zn) phases. There are eight ternary invariant reactions, and the liquid + (Ag) = β-AgZn + ζ-Ag4Sn reaction is of the highest temperature at 935.5 K. Thermodynamic modeling of the ternary Sn-Ag-Zn system was also carried out in this study based on the thermodynamic models of the three constituent binary systems and the experimentally determined liquidus projection. The liquidus projection and the isothermal sections are calculated. The calculated and experimentally determined liquidus projections are in good agreement.

  11. Project W-340 tank 241-C-106 manipulator system closeout summary

    International Nuclear Information System (INIS)

    McDaniel, L.B.

    1995-02-01

    This document summarizes the work that was ongoing when Project W-340 was put on hold. Project W-340: Tank 241-C-106 Manipulator Retrieval System, was a candidate FY98 Major System Acquisition. The project was to develop, procure and deploy a Long Reach Manipulator (LRM) waste retrieval system to provide an alternate method to completing the in-tank demonstration of Single Shell Tank waste retrieval technology. The need for enhanced capabilities derives from (1) the inability of the baseline technology to retrieve certain hard waste forms; (2) uncertainty in the quantity of leakage which will be allowed. Numerous studies over the years have identified an arm architecture as a promising retrieval technology to overcome these concerns. The W340 project was intended to further develop and demonstrate this alternative, as part of selecting the best approach for all tanks. Prior to completing the effort, it was determined that an LRM system was too architecture specific and was envisioned to be too expensive for a one time demonstration of retrieval technology. At the time the work was stopped, an effort was underway to broaden the project scope to allow alternatives to an arm-based system

  12. Survey of on-road image projection with pixel light systems

    Science.gov (United States)

    Rizvi, Sadiq; Knöchelmann, Marvin; Ley, Peer-Phillip; Lachmayer, Roland

    2017-12-01

    HID, LED and laser-based high resolution automotive headlamps, as of late known as `pixel light systems', are at the forefront of the developing technologies paving the way for autonomous driving. In addition to light distribution capabilities that outperform Adaptive Front Lighting and Matrix Beam systems, pixel light systems provide the possibility of image projection directly onto the street. The underlying objective is to improve the driving experience, in any given scenario, in terms of safety, comfort and interaction for all road users. The focus of this work is to conduct a short survey on this state-of-the-art image projection functionality. A holistic research regarding the image projection functionality can be divided into three major categories: scenario selection, technological development and evaluation design. Consequently, the work presented in this paper is divided into three short studies. Section 1 provides a brief introduction to pixel light systems and a justification for the approach adopted for this study. Section 2 deals with the selection of scenarios (and driving maneuvers) where image projection can play a critical role. Section 3 discusses high power LED and LED array based prototypes that are currently under development. Section 4 demonstrates results from an experiment conducted to evaluate the illuminance of an image space projected using a pixel light system prototype developed at the Institute of Product Development (IPeG). Findings from this work can help to identify and advance future research work relating to: further development of pixel light systems, scenario planning, examination of optimal light sources, behavioral response studies etc.

  13. XUV free-electron laser-based projection lithography systems

    Energy Technology Data Exchange (ETDEWEB)

    Newnam, B.E.

    1990-01-01

    Free-electron laser sources, driven by rf-linear accelerators, have the potential to operate in the extreme ultraviolet (XUV) spectral range with more than sufficient average power for high-volume projection lithography. For XUV wavelengths from 100 nm to 4 nm, such sources will enable the resolution limit of optical projection lithography to be extended from 0.25 {mu}m to 0.05{mu}m and with an adequate total depth of focus (1 to 2 {mu}m). Recent developments of a photoinjector of very bright electron beams, high-precision magnetic undulators, and ring-resonator cavities raise our confidence that FEL operation below 100 nm is ready for prototype demonstration. We address the motivation for an XUV FEL source for commercial microcircuit production and its integration into a lithographic system, include reflecting reduction masks, reflecting XUV projection optics and alignment systems, and surface-imaging photoresists. 52 refs., 7 figs.

  14. Digital detection systems for projection radiography

    International Nuclear Information System (INIS)

    Schulz, R.F.

    2001-01-01

    This article gives a survey of digital X-ray detection systems for projection radiography. The different principles are compared and some general characteristics are derived. The basic conversion mechanisms in the absorption layers are described. The basic principles of solid state X-ray detectors and their general characteristics are elucidated as well as some similarities with detectors for computed tomography. Some important application and system aspects are considered. An outlook on further possible developments in this field is given. (orig.) [de

  15. Setup and organisation of a NDA-system procurement project

    International Nuclear Information System (INIS)

    Botte, John; Gielen, Paul

    2007-01-01

    Belgoprocess is momentarily in the process of purchasing its fifth NDA-system. Measurement systems are, although based on general designs, not from the shelf items but tailor-made sophisticated and highly automated devices. It is obvious that such a project cannot be carried out by solely a NDA team, but needs a multifunctional team. This team combines NDA expertise with experts in civil works, electrical and mechanical engineering, procurement, IT, safety and legal administration. From less positive experiences in the past, Belgoprocess learned a lot and has now a systematic in place. This systematic structures the project from definition of requirements to operation, a two to three year process. This paper defines the phases of a NDA project and gives for each phase some do's and don'ts. A second subject is the writing and handling of the vast but needed and required documentation. It gives a brief overview of the over thirty documents and files needed. The described, integrated and formal approach reduces the risk of failing projects, systems not meeting the expectations or denied qualification. It puts clear agreements in place, smoothening the relationship between company, supplier and authorities. (authors)

  16. A New 4D Hyperchaotic System and Its Generalized Function Projective Synchronization

    Directory of Open Access Journals (Sweden)

    Yuan Gao

    2013-01-01

    Full Text Available A new four-dimensional hyperchaotic system is investigated. Numerical and analytical studies are carried out on its basic dynamical properties, such as equilibrium point, Lyapunov exponents, Poincaré maps, and chaotic dynamical behaviors. We verify the realizability of the new system via an electronic circuit by using Multisim software. Furthermore, a generalized function projective synchronization scheme of two different hyperchaotic systems with uncertain parameters is proposed, which includes some existing projective synchronization schemes, such as generalized projection synchronization and function projective synchronization. Based on the Lyapunov stability theory, a controller with parameters update laws is designed to realize synchronization. Using this controller, we realize the synchronization between Chen hyperchaotic system and the new system to verify the validity and feasibility of our method.

  17. GCD TechPort Data Sheets Thermal Protection System Materials (TPSM) Project

    Science.gov (United States)

    Chinnapongse, Ronald L.

    2014-01-01

    The Thermal Protection System Materials (TPSM) Project consists of three distinct project elements: the 3-Dimensional Multifunctional Ablative Thermal Protection System (3D MAT) project element; the Conformal Ablative Thermal Protection System (CA-TPS) project element; and the Heatshield for Extreme Entry Environment Technology (HEEET) project element. 3D MAT seeks to design, develop and deliver a game changing material solution based on 3-dimensional weaving and resin infusion approach for manufacturing a material that can function as a robust structure as well as a thermal protection system. CA-TPS seeks to develop and deliver a conformal ablative material designed to be efficient and capable of withstanding peak heat flux up to 500 W/ sq cm, peak pressure up to 0.4 atm, and shear up to 500 Pa. HEEET is developing a new ablative TPS that takes advantage of state-of-the-art 3D weaving technologies and traditional manufacturing processes to infuse woven preforms with a resin, machine them to shape, and assemble them as a tiled solution on the entry vehicle substructure or heatshield.

  18. A Role for Soft Systems Methodology in ELT Projects.

    Science.gov (United States)

    Holliday, Adrian

    1990-01-01

    Discusses the uses for soft systems methodology (SSM) in English language training (ELT) projects. It is suggested that ethnographic techniques may help in achieving the understanding needed to start an ELT project while SSM may provide a useful means for structuring ethnographic findings. (Author/VWL)

  19. Tank waste remediation system characterization project quality policies

    International Nuclear Information System (INIS)

    Board, D.C.

    1997-01-01

    This quality plan describes the system used by Characterization Project management to achieve quality. This plan is comprised of eleven quality policies which, when taken together, form a management system deployed to achieve quality. This quality management system is based on the customer's quality requirements known as the 'RULE', 10 CFR 830.120, Quality Assurance

  20. MSFC Propulsion Systems Department Knowledge Management Project

    Science.gov (United States)

    Caraccioli, Paul A.

    2007-01-01

    This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

  1. Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course

    Science.gov (United States)

    Junid, Syed Abdul Mutalib Al; Hussaini, Yusnira; Nazmie Osman, Fairul; Razak, Abdul Hadi Abdul; Idros, Mohd Faizul Md; Karimi Halim, Abdul

    2018-03-01

    This paper reports the evaluation of the embedded system component utilized in delivering the integrated electronic engineering design project course. The evaluation is conducted based on the report project submitted as to fulfil the assessment criteria for the integrated electronic engineering design project course named; engineering system design. Six projects were assessed in this evaluation. The evaluation covers the type of controller, programming language and the number of embedded component utilization as well. From the evaluation, the C-programming based language is the best solution preferred by the students which provide them flexibility in the programming. Moreover, the Analog to Digital converter is intensively used in the projects which include sensors in their proposed design. As a conclusion, in delivering the integrated design project course, the knowledge over the embedded system solution is very important since the high density of the knowledge acquired in accomplishing the project assigned.

  2. THE MODEL OF EXPERT SYSTEM FOR SCIENTIFIC PROJECTS EVALUATION IN HIGHER EDUCATIONAL INSTITUTIONS

    Directory of Open Access Journals (Sweden)

    Олександр Михайлович ВОЗНИЙ

    2015-05-01

    Full Text Available There have been proposed the model of the expert system for the assessment of research projects in higher educational institutions, based on estimates of probability. It allows to rank alternative projects and scenarios. The model is implemented through the software "Small expert system." The principle of calculating the probability of approval of research projects, which form the basis of the expert system, is based on Bayes' theorem. Expert system calculates the probability of approval of research projects by Ministry of Science and Education on the basis of the responses to questions about the content of the request for the execution of research projects. Questions are formed on the basis of the criteria by which experts of state authorities evaluate scientific research projects.

  3. About Nano-JASMINE Satellite System and Project Status

    Science.gov (United States)

    Sako, Nobutada

    Intelligent Space Systems Laboratory, The University of Tokyo (ISSL) and National Astronomical Observatory of Japan (NAO) have been developing a small infrared astrometry satellite named “Nano-JASMINE”. The satellite size is about 50cm cubic and 20kg, which plays a pre-cursor role of JASMINE Project which is programmed by NAO and JAXA. In addition, since there has been only one astrometry satellite HIPPARCOS by ESA in the past, Nano-JASMINE is also expected to achieve certain scientific results in the field of astrometry. In this project, ISSL aims to develop new advanced small satellite bus system whose performance is comparable to that of 100-500kg sized satellites, including attitude stability of 1 arc-second and thermal stability of the mission subsystem of 1 mK. This paper overviews the Nano-JASMINE bus system with emphasis on attitude and thermal control systems.

  4. Status of Pantex Plant Waste Management Project/program control system

    International Nuclear Information System (INIS)

    Price, Wesley J.; Matthews, William L.

    1992-01-01

    During a December 1990 Waste Management Program Review held in Albuquerque, New Mexico, the Waste Management and Operational Surety Division (WMOSD) introduced the project control system to be used for the Waste Management (WM) Operations Program. The system was entitled 'TRAC-WM' (Tracking and Control for Waste Management). The stated objective for this system was to establish a frame work for planning, managing, and controlling work within the WM program. As a result Mason and Hanger (the operating contractor at the Pantex Plant) initiated the development of a computerized waste management project tracking system. (author)

  5. Generalized projective synchronization of chaotic systems via adaptive learning control

    International Nuclear Information System (INIS)

    Yun-Ping, Sun; Jun-Min, Li; Hui-Lin, Wang; Jiang-An, Wang

    2010-01-01

    In this paper, a learning control approach is applied to the generalized projective synchronisation (GPS) of different chaotic systems with unknown periodically time-varying parameters. Using the Lyapunov–Krasovskii functional stability theory, a differential-difference mixed parametric learning law and an adaptive learning control law are constructed to make the states of two different chaotic systems asymptotically synchronised. The scheme is successfully applied to the generalized projective synchronisation between the Lorenz system and Chen system. Moreover, numerical simulations results are used to verify the effectiveness of the proposed scheme. (general)

  6. On the use of polar coordinate system in the projective graphic drawings

    Directory of Open Access Journals (Sweden)

    Ivashchenko Andrey Viktorovich

    2016-11-01

    Full Text Available Projective graphics is a polyhedra simulation method, which is based on the use of trace diagrams of initial polyhedron. Previously developed computer software allows using Cartesian coordinates. In some cases it is advisable to use polar coordinate system for description of projective graphics drawings. Using the example of icosahedron the authors analyzed the advantages of using projective graphics drawings in the polar coordinate system. The transition to the polar coordinate system is a tool that allows using certain patterns of projective graphics drawings in the process of calculation. When using polar coordinate system the search of Polar correspondence for the directs is simplified. In order to analyze the two lines in the polar coordinate system it is enough to compare the corresponding coefficients of the equations of these lines. The authors consider a diagram of the icosahedron in polar coordinates, and a corresponding fragment of calculation program in the Mathematica system. Some examples of forming based on icosahedrons are offered. Optimization of computer programs using polar coordinate system will simplifies the calculations of projective graphics drawings, accelerates the process of constructing three-dimensional models, which expand the possibilities of selecting original solutions. Finally, the authors conclude that it is appropriate to use the polar coordinate system only in the construction of projective graphics diagrams of the planes system having rich symmetry. All Platonic and Archimedean solids, Catalan solid possess this property.

  7. IT Project Management from a Systems Thinking Perspective: A Position Paper

    NARCIS (Netherlands)

    van Eck, Pascal; Ponisio, Laura

    2008-01-01

    We proposes a Systems Thinking approach to the study of IT project management and show how this approach helps project managers in controlling their projects. To illustrate our proposal, we present an example model of the dynamics of IT out-sourcing projects. The example model explains these

  8. Homogenisation in project management for large German research projects in the Earth system sciences: overcoming the institutional coordination bias

    Science.gov (United States)

    Rauser, Florian; Vamborg, Freja

    2016-04-01

    The interdisciplinary project on High Definition Clouds and Precipitation for advancing climate prediction HD(CP)2 (hdcp2.eu) is an example for the trend in fundamental research in Europe to increasingly focus on large national and international research programs that require strong scientific coordination. The current system has traditionally been host-based: project coordination activities and funding is placed at the host institute of the central lead PI of the project. This approach is simple and has the advantage of strong collaboration between project coordinator and lead PI, while exhibiting a list of strong, inherent disadvantages that are also mentioned in this session's description: no community best practice development, lack of integration between similar projects, inefficient methodology development and usage, and finally poor career development opportunities for the coordinators. Project coordinators often leave the project before it is finalized, leaving some of the fundamentally important closing processes to the PIs. This systematically prevents the creation of professional science management expertise within academia, which leads to an automatic imbalance that hinders the outcome of large research programs to help future funding decisions. Project coordinators in academia often do not work in a professional project office environment that could distribute activities and use professional tools and methods between different projects. Instead, every new project manager has to focus on methodological work anew (communication infrastructure, meetings, reporting), even though the technological needs of large research projects are similar. This decreases the efficiency of the coordination and leads to funding that is effectively misallocated. We propose to challenge this system by creating a permanent, virtual "Centre for Earth System Science Management CESSMA" (cessma.com), and changing the approach from host- based to centre-based. This should

  9. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project KDP-C Review

    Science.gov (United States)

    Grindle, Laurie; Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    The topics discussed are the UAS-NAS project life-cycle and ARMD thrust flow down, as well as the UAS environments and how we operate in those environments. NASA's Armstrong Flight Research Center at Edwards, CA, is leading a project designed to help integrate unmanned air vehicles into the world around us. The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS in the NAS, will contribute capabilities designed to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The project falls under the Integrated Systems Research Program office managed at NASA Headquarters by the agency's Aeronautics Research Mission Directorate. NASA's four aeronautics research centers - Armstrong, Ames Research Center, Langley Research Center, and Glenn Research Center - are part of the technology development project. With the use and diversity of unmanned aircraft growing rapidly, new uses for these vehicles are constantly being considered. Unmanned aircraft promise new ways of increasing efficiency, reducing costs, enhancing safety and saving lives 460265main_ED10-0132-16_full.jpg Unmanned aircraft systems such as NASA's Global Hawks (above) and Predator B named Ikhana (below), along with numerous other unmanned aircraft systems large and small, are the prime focus of the UAS in the NAS effort to integrate them into the national airspace. Credits: NASA Photos 710580main_ED07-0243-37_full.jpg The UAS in the NAS project envisions performance-based routine access to all segments of the national airspace for all unmanned aircraft system classes, once all safety-related and technical barriers are overcome. The project will provide critical data to such key stakeholders and customers as the Federal Aviation Administration and RTCA Special Committee 203 (formerly the Radio Technical Commission for Aeronautics) by conducting integrated, relevant system-level tests to adequately address

  10. Acousto-optic laser projection systems for displaying TV information

    International Nuclear Information System (INIS)

    Gulyaev, Yu V; Kazaryan, M A; Mokrushin, Yu M; Shakin, O V

    2015-01-01

    This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation. (review)

  11. Acousto-optic laser projection systems for displaying TV information

    Science.gov (United States)

    Gulyaev, Yu V.; Kazaryan, M. A.; Mokrushin, Yu M.; Shakin, O. V.

    2015-04-01

    This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation.

  12. Acousto-optic laser projection systems for displaying TV information

    Energy Technology Data Exchange (ETDEWEB)

    Gulyaev, Yu V [V.A.Kotel' nikov Institute of Radio Engineering and Electronics, Russian Academy of Sciences, Moscow (Russian Federation); Kazaryan, M A [P N Lebedev Physics Institute, Russian Academy of Sciences, Moscow (Russian Federation); Mokrushin, Yu M [D.V. Efremov Scientific Research Institute of Electrophysical Apparatus (Russian Federation); Shakin, O V [Ioffe Physical Technical Institute, Russian Academy of Sciences, St. Petersburg (Russian Federation)

    2015-04-30

    This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation. (review)

  13. Case Studies in Application of System Engineering Practices to Capstone Projects

    Science.gov (United States)

    Murphy, Gloria; vanSusante, Paul; Carmen, Christina; Morris, Tommy; Schmidt, Peter; Zalewski, Janusz

    2011-01-01

    The Exploration Systems Mission Directorate (ESMD) of the National Aeronautics and Space Administration (NASA) sponsors a faculty fellowship program that engages researchers with interests aligned with current ESMD development programs. The faculty-members are committed to run a capstone senior design project based- on the materials and experience gained during the fellowship. For the 2010 - 2011 academic year, 5 projects were approved. These projects are in the areas of mechanical and electrical hardware design and optimization, fault prediction and extra planetary civil site preparation. This work summarizes the projects, describes the student teams performing the work, and comments on the integration of Systems Engineering principles into the projects, as well as the affected course curriculums.

  14. CooMan - a global collaborative project management system

    International Nuclear Information System (INIS)

    Souza, J.M. de; Palma, S.

    1994-01-01

    Project Coordination and Management have long been recognized as an area with growing problems and unsatisfactory solutions. Conciliating flexibility with target achievements is historically the main problem to face. The difficulties have been growing at more than linear ratio with the size and complexity of the Projects being developed in the present days. The HEP communities suffer additional challenges because of the distributed nature of the collaborations, the novelty of each project; and the less authoritarian form of leadership and management of team and individual. This prevents the adoption of more centralized focus on decision. CooMan intends to be a Global Collaborative Project Management System. This paper discusses the basic aspects of the concepts involved, outlining how task coordination, acts of speech, and World-Wide hyper media can be used to support project management activities. A distributed tool to implement such proposition is described, and a first prototype is presented

  15. Image reconstruction technique using projection data from neutron tomography system

    Directory of Open Access Journals (Sweden)

    Waleed Abd el Bar

    2015-12-01

    Full Text Available Neutron tomography is a very powerful technique for nondestructive evaluation of heavy industrial components as well as for soft hydrogenous materials enclosed in heavy metals which are usually difficult to image using X-rays. Due to the properties of the image acquisition system, the projection images are distorted by several artifacts, and these reduce the quality of the reconstruction. In order to eliminate these harmful effects the projection images should be corrected before reconstruction. This paper gives a description of a filter back projection (FBP technique, which is used for reconstruction of projected data obtained from transmission measurements by neutron tomography system We demonstrated the use of spatial Discrete Fourier Transform (DFT and the 2D Inverse DFT in the formulation of the method, and outlined the theory of reconstruction of a 2D neutron image from a sequence of 1D projections taken at different angles between 0 and π in MATLAB environment. Projections are generated by applying the Radon transform to the original image at different angles.

  16. Project Management of a personnel radiation records computer system

    International Nuclear Information System (INIS)

    Labenski, T.

    1984-01-01

    Project Management techniques have been used to develop a data base management information system to provide storage and retrieval of personnel radiation and Health Physics records. The system is currently being developed on a Hewlett Packard 1000 Series E Computer with provisions to include plant radiation survey information, radiation work permit information, inventory management for Health Physics supplies and instrumentation, and control of personnel access to radiological controlled areas. The methodologies used to manage the overall project are presented along with selection and management of software vendors

  17. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    Science.gov (United States)

    Lawrence N. Hudson; Joseph Wunderle M.; And Others

    2016-01-01

    The PREDICTS project—Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)—has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to...

  18. Project Management Information System: the Role and the Issues of Implementation

    Directory of Open Access Journals (Sweden)

    Dumitru OPREA

    2006-01-01

    Full Text Available We are coping more and more with the project and project management in day by day life. Even if some activities are the similarly with common organization actions, the life cycle project activities request more information and more actions. So it is necessary to have some tools, methods and rules to manage a large amount of information which must be disseminated to numerous stakeholders. This need could be solved by project management information systems (PMIS. PMIS is a complex one, with various components which are depending on type of project, type of organization etc. The latest evolution of information and communication technology was favorable to our research field. Therefore, there are different tools to support the structure, automation and efficiency of PMIS. Moreover from several years it is spread the following notions: web-based project management, project management office, enterprise project management. So, we can see the fast evolution of this field. But, our paper will bring general ideas relating to project management information systems, like definition of PMIS, the project life cycle and the information needed of each stage, various tools to support the PMIS procedures. The characteristics, tools, trends will be our future research.

  19. A project management system for the X-29A flight test program

    Science.gov (United States)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The project-management system developed for NASA's participation in the X-29A aircraft development program is characterized from a theoretical perspective, as an example of a system appropriate to advanced, highly integrated technology projects. System-control theory is applied to the analysis of classical project-management techniques and structures, which are found to be of closed-loop multivariable type; and the effects of increasing project complexity and integration are evaluated. The importance of information flow, sampling frequency, information holding, and delays is stressed. The X-29A system is developed in four stages: establishment of overall objectives and requirements, determination of information processes (block diagrams) definition of personnel functional roles and relationships, and development of a detailed work-breakdown structure. The resulting system is shown to require a greater information flow to management than conventional methods. Sample block diagrams are provided.

  20. Volunteered Geographic Information System Design: Project and Participation Guidelines

    Directory of Open Access Journals (Sweden)

    José-Pablo Gómez-Barrón

    2016-07-01

    Full Text Available This article sets forth the early phases of a methodological proposal for designing and developing Volunteered Geographic Information (VGI initiatives based on a system perspective analysis in which the components depend and interact dynamically among each other. First, it focuses on those characteristics of VGI projects that present different goals and modes of organization, while using a crowdsourcing strategy to manage participants and contributions. Next, a tool is developed in order to design the central crowdsourced processing unit that is best suited for a specific project definition, associating it with a trend towards crowd-based or community-driven approaches. The design is structured around the characterization of different ways of participating, and the task cognitive demand of working on geo-information management, spatial problem solving and ideation, or knowledge acquisition. Then, the crowdsourcing process design helps to identify what kind of participants are needed and outline subsequent engagement strategies. This is based on an analysis of differences among volunteers’ participatory behaviors and the associated set of factors motivating them to contribute, whether on a crowd or community-sourced basis. From a VGI system perspective, this paper presents a set of guidelines and methodological steps in order to align project goals, processes and volunteers and thus successfully attract participation. This methodology helps establish the initial requirements for a VGI system, and, in its current state, it mainly focuses on two components of the system: project and participants.

  1. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  2. NNWSI project information management system concepts evaluation report. Final report

    International Nuclear Information System (INIS)

    1986-08-01

    This report is intended as a first step in developing detailed information management system specifications for the Nevada Nuclear Waste Storage Investigations (NNWSI) Project. The current state of information management at the NNWSI Project level is investigated and an information management system (IMS) is proposed. The IMS as it relates to aspects of Project and records management is discussed. Information management concepts and prospective IMS system components are investigated. Concepts and system components include: indexing, searching, retrieval, data base management system technology, computers, storage media, computer-assisted retrieval (CAR) of microfilm, electronic imaging-based systems, optical character recognition, and communications. Performance criteria and desirable system attributes applicable to the IMS are discussed. Six conceptual system approaches capable of satisfying the performance criteria are defined. System approaches include: fully centralized microfilm system based on CAR retrieval (Approach 1), partially distributed microfilm system based on CAR retrieval (Approach 2), fully distributed microfilm system based on CAR retrieval (Approach 3), fully centralized optical disk system based on electronic image and full-text retrieval (Approach 4), partially distributed optical system based on electron image and full-text retrieval (Approach 5), and fully distributed optical disk system based on electronic image and full-text retrieval (Approach 6). Technical and cost considerations associated with the six conceptual approaches are evaluated. Technical evaluation results indicate Approach 4 is the best conceptual approach, and cost evaluation results show no significant differences among approaches. On the basis of the evaluation, Approach 4 is recommended

  3. Promoting system-level learning from project-level lessons

    Energy Technology Data Exchange (ETDEWEB)

    Jong, Amos A. de, E-mail: amosdejong@gmail.com [Innovation Management, Utrecht (Netherlands); Runhaar, Hens A.C., E-mail: h.a.c.runhaar@uu.nl [Section of Environmental Governance, Utrecht University, Utrecht (Netherlands); Runhaar, Piety R., E-mail: piety.runhaar@wur.nl [Organisational Psychology and Human Resource Development, University of Twente, Enschede (Netherlands); Kolhoff, Arend J., E-mail: Akolhoff@eia.nl [The Netherlands Commission for Environmental Assessment, Utrecht (Netherlands); Driessen, Peter P.J., E-mail: p.driessen@geo.uu.nl [Department of Innovation and Environment Sciences, Utrecht University, Utrecht (Netherlands)

    2012-02-15

    A growing number of low and middle income nations (LMCs) have adopted some sort of system for environmental impact assessment (EIA). However, generally many of these EIA systems are characterised by a low performance in terms of timely information dissemination, monitoring and enforcement after licencing. Donor actors (such as the World Bank) have attempted to contribute to a higher performance of EIA systems in LMCs by intervening at two levels: the project level (e.g. by providing scoping advice or EIS quality review) and the system level (e.g. by advising on EIA legislation or by capacity building). The aims of these interventions are environmental protection in concrete cases and enforcing the institutionalisation of environmental protection, respectively. Learning by actors involved is an important condition for realising these aims. A relatively underexplored form of learning concerns learning at EIA system-level via project level donor interventions. This 'indirect' learning potentially results in system changes that better fit the specific context(s) and hence contribute to higher performances. Our exploratory research in Ghana and the Maldives shows that thus far, 'indirect' learning only occurs incidentally and that donors play a modest role in promoting it. Barriers to indirect learning are related to the institutional context rather than to individual characteristics. Moreover, 'indirect' learning seems to flourish best in large projects where donors achieved a position of influence that they can use to evoke reflection upon system malfunctions. In order to enhance learning at all levels donors should thereby present the outcomes of the intervention elaborately (i.e. discuss the outcomes with a large audience), include practical suggestions about post-EIS activities such as monitoring procedures and enforcement options and stimulate the use of their advisory reports to generate organisational memory and ensure a better

  4. Promoting system-level learning from project-level lessons

    International Nuclear Information System (INIS)

    Jong, Amos A. de; Runhaar, Hens A.C.; Runhaar, Piety R.; Kolhoff, Arend J.; Driessen, Peter P.J.

    2012-01-01

    A growing number of low and middle income nations (LMCs) have adopted some sort of system for environmental impact assessment (EIA). However, generally many of these EIA systems are characterised by a low performance in terms of timely information dissemination, monitoring and enforcement after licencing. Donor actors (such as the World Bank) have attempted to contribute to a higher performance of EIA systems in LMCs by intervening at two levels: the project level (e.g. by providing scoping advice or EIS quality review) and the system level (e.g. by advising on EIA legislation or by capacity building). The aims of these interventions are environmental protection in concrete cases and enforcing the institutionalisation of environmental protection, respectively. Learning by actors involved is an important condition for realising these aims. A relatively underexplored form of learning concerns learning at EIA system-level via project level donor interventions. This ‘indirect’ learning potentially results in system changes that better fit the specific context(s) and hence contribute to higher performances. Our exploratory research in Ghana and the Maldives shows that thus far, ‘indirect’ learning only occurs incidentally and that donors play a modest role in promoting it. Barriers to indirect learning are related to the institutional context rather than to individual characteristics. Moreover, ‘indirect’ learning seems to flourish best in large projects where donors achieved a position of influence that they can use to evoke reflection upon system malfunctions. In order to enhance learning at all levels donors should thereby present the outcomes of the intervention elaborately (i.e. discuss the outcomes with a large audience), include practical suggestions about post-EIS activities such as monitoring procedures and enforcement options and stimulate the use of their advisory reports to generate organisational memory and ensure a better information

  5. Implementing the theories: A fully integrated project control system that's implemented and works

    International Nuclear Information System (INIS)

    Harris, R.E.

    1994-01-01

    Using the theories presented in DOE Orders 4700.1, 1332.1A, and Notice 4700.5 as the basis for system design, the Fernald Environmental Restoration Management Corporation (FERMCO) has developed and implemented a Project Control System (PCS) that complies with requirements and provides DOE and FERMCO management with timely performance measurement information. To this extent, the FERMCO PCS probably is similar to the systems of the majority of the contractors in the DOE complex. In fact. this facet of the FERMCO PCS generally mirrors those used on projects around the world by FERMCO's parent company, Fluor Daniel. Starting with this open-quotes platformclose quotes, the vision and challenge of creating a fully integrated system commenced. An open-architecture systems approach is the factor that most greatly influenced and enabled the successful development and implementation of the Project Control System for the Fernald Environmental Management Project. All aspects of a fully integrated system were considered during the design phase. The architecture of the FERMCO system enables seamless, near real-time, transfer of data both from and to the Project Control System with all other related systems. The primary systems that provide and share data with the Project Control System include those used by the Payroll, Accounting, Procurement, and Human Resources organizations. To enable data linking with these organizations, the resource codes were designed to map many-to-one from their detailed codes to the summarized codes used in the PCS

  6. Study and project of a radiation monitoring system in ships

    International Nuclear Information System (INIS)

    Morgado, Mario Monteiro

    1998-01-01

    In this work we present the project and the development of a radiation detection system for use in ships, called RADINAC. This system was developed to measure the radiation in several points of the ship and to give the dose rates and total dose. The radioactive activity of the sea water is also measured. The project was based on a system developed in the middle of the seventies which is not working due to the lack of some mechanical and electronic components. The RADINAC system was developed in order to nationalize and modernize the old project. The detectors used are plastic scintillator to measure the sea water radioactive activity and ionization chambers to measure the dose rates. The nuclear instrumentation has only three imported items: acquisition data board, picoamperimeter and photomultiplier tube. All the other items are made in Brazil. With regard to the data acquisition, we used the Labwindows software to create the 'virtual instruments' in order to display the data on the computer monitor. (author)

  7. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  8. Design of project management system for 10 MW high temperature gas-cooled test reactor

    International Nuclear Information System (INIS)

    Zhu Yan; Xu Yuanhui

    1998-01-01

    A framework of project management information system (MIS) for 10 MW high temperature gas-cooled test reactor is introduced. Based on it, the design of nuclear project management information system and project monitoring system (PMS) are given. Additionally, a new method of developing MIS and Decision Support System (DSS) has been tried

  9. The GEM Detector projective alignment simulation system

    International Nuclear Information System (INIS)

    Wuest, C.R.; Belser, F.C.; Holdener, F.R.; Roeben, M.D.; Paradiso, J.A.; Mitselmakher, G.; Ostapchuk, A.; Pier-Amory, J.

    1993-01-01

    Precision position knowledge (< 25 microns RMS) of the GEM Detector muon system at the Superconducting Super Collider Laboratory (SSCL) is an important physics requirement necessary to minimize sagitta error in detecting and tracking high energy muons that are deflected by the magnetic field within the GEM Detector. To validate the concept of the sagitta correction function determined by projective alignment of the muon detectors (Cathode Strip Chambers or CSCs), the basis of the proposed GEM alignment scheme, a facility, called the ''Alignment Test Stand'' (ATS), is being constructed. This system simulates the environment that the CSCs and chamber alignment systems are expected to experience in the GEM Detector, albeit without the 0.8 T magnetic field and radiation environment. The ATS experimental program will allow systematic study and characterization of the projective alignment approach, as well as general mechanical engineering of muon chamber mounting concepts, positioning systems and study of the mechanical behavior of the proposed 6 layer CSCs. The ATS will consist of a stable local coordinate system in which mock-ups of muon chambers (i.e., non-working mechanical analogs, representing the three superlayers of a selected barrel and endcap alignment tower) are implemented, together with a sufficient number of alignment monitors to overdetermine the sagitta correction function, providing a self-consistency check. This paper describes the approach to be used for the alignment of the GEM muon system, the design of the ATS, and the experiments to be conducted using the ATS

  10. Designing and Conducting Health Systems Research Projects ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · Resources · Publications. Designing and Conducting Health Systems Research Projects Volume 1: Proposal Development and Fieldwork ... IDRC and the United Kingdom's Global AMR Innovation Fund—managed by the ... New website will help record vital life events to improve access to services for all.

  11. 76 FR 12354 - Cumberland System of Projects

    Science.gov (United States)

    2011-03-07

    ... Third Scenario--Return to Original Marketing Policy Inside TVA Preference Customers Capacity and Base.... Discussion: The marketing policy for the Cumberland System of Projects provides peaking capacity, along with 1500 hours of energy annually with each kilowatt of capacity, to customers outside the Tennessee Valley...

  12. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  13. 42 CFR 403.308 - State systems under demonstration projects-mandatory approval.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false State systems under demonstration projects..., DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS SPECIAL PROGRAMS AND PROJECTS Recognition of State... approval of a State system are met under § 403.304 (b)(1)-(10) and § 403.304(c), and, if appropriate § 403...

  14. The Fox Project: Advanced Development of Systems Software

    National Research Council Canada - National Science Library

    1999-01-01

    The long-term objectives of the Carnegie Mellon Fox Project are to improve the design and construction of systems software and to further the development of advanced programming language technology...

  15. The Fox Project: Advanced Development of Systems Software

    National Research Council Canada - National Science Library

    2000-01-01

    The long-term objectives of the Carnegie Mellon Fox Project are to improve the design and construction of systems software and to further the development of advanced programming language technology...

  16. Sandia photovoltaic systems definition and application experiment projects

    Energy Technology Data Exchange (ETDEWEB)

    Jones, G.

    1983-04-01

    A compilation is given of the abstracts and visual material used in presentation at the Fourth Photovoltaic Systems Definition and Applications Projects Integration Meeting held at the Marriott Hotel, April 12-14, 1983, in Albuquerque, New Mexico. The meeting provided a forum for detailed analyses on recently completed and current activities. These activities include systems research, balance-of-system technology development, residential experimentation, and evaluation of intermediate-sized applications.

  17. Technical specification for the Quality Information Management System (QIMS) Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Hall, R.C.; Claussen, L.M.; Thurston, I.

    1992-01-01

    This document contains implementation details for the Quality Information Management System (QIMS) Pilot Project, which has been released for VAX/VMS systems using the INGRES RDBMS. The INGRES Applications-By-Forms (ABF) software development tool was used to define the modules and screens which comprise the QIMS Pilot application. These specifications together with the QIMS information model and corresponding database definition constitute the QIMS technical specification and implementation description presented herein. The QIMS Pilot Project represents a completed software product which has been released for production use. Further extension projects are planned which will release new versions for QIMS. These versions will offer expanded and enhanced functionality to meet further customer requirements not accommodated by the QIMS Pilot Project.

  18. Guide on Project Web Access of SFR R and D and Technology Monitoring System

    International Nuclear Information System (INIS)

    Lee, Dong Uk; Won, Byung Chool; Lee, Yong Bum; Kim, Young In; Hahn, Do Hee

    2008-09-01

    The SFR R and D and technology monitoring system based on the MS enterprise project management is developed for systematic effective management of 'Development of Basic Key Technologies for Gen IV SFR' project which was performed under the Mid- and Long-term Nuclear R and D Program sponsored by the Ministry of Education, Science and Technology. This system is a tool for project management based on web access. Therefore this manual is a detailed guide for Project Web Access(PWA). Section 1 describes the common guide for using of system functions such as project server 2007 client connection setting, additional outlook function setting etc. The section 2 describes the guide for system administrator. It is described the guide for project management in section 3, 4

  19. Guide on Project Web Access of SFR R and D and Technology Monitoring System

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dong Uk; Won, Byung Chool; Lee, Yong Bum; Kim, Young In; Hahn, Do Hee

    2008-09-15

    The SFR R and D and technology monitoring system based on the MS enterprise project management is developed for systematic effective management of 'Development of Basic Key Technologies for Gen IV SFR' project which was performed under the Mid- and Long-term Nuclear R and D Program sponsored by the Ministry of Education, Science and Technology. This system is a tool for project management based on web access. Therefore this manual is a detailed guide for Project Web Access(PWA). Section 1 describes the common guide for using of system functions such as project server 2007 client connection setting, additional outlook function setting etc. The section 2 describes the guide for system administrator. It is described the guide for project management in section 3, 4.

  20. Solid waste information and tracking system server conversion project management plan

    International Nuclear Information System (INIS)

    MAY, D.L.

    1999-01-01

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents

  1. Software qualification for digital safety system in KNICS project

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Lee, Dong-Young; Choi, Jong-Gyun

    2012-01-01

    In order to achieve technical self-reliance in the area of nuclear instrumentation and control, the Korea Nuclear Instrumentation and Control System (KNICS) project had been running for seven years from 2001. The safety-grade Programmable Logic Controller (PLC) and the digital safety system were developed by KNICS project. All the software of the PLC and digital safety system were developed and verified following the software development life cycle Verification and Validation (V and V) procedure. The main activities of the V and V process are preparation of software planning documentations, verification of the Software Requirement Specification (SRS), Software Design Specification (SDS) and codes, and a testing of the software components, the integrated software, and the integrated system. In addition, a software safety analysis and a software configuration management are included in the activities. For the software safety analysis at the SRS and SDS phases, the software Hazard Operability (HAZOP) was performed and then the software fault tree analysis was applied. The software fault tree analysis was applied to a part of software module with some critical defects identified by the software HAZOP in SDS phase. The software configuration management was performed using the in-house tool developed in the KNICS project. (author)

  2. MITI project on advanced man-machine system for nuclear power plants

    International Nuclear Information System (INIS)

    Kato, Kanji; Watanabe, Takao; Hayakawa, Hiroyasu; Naito, Norio; Masui, Takao; Ogino, Takamichi.

    1988-01-01

    A computerized operator support system (COSS) against abnormal plant conditions was developed as a five-year project from 1980 to 1984, under the sponsorship of the Ministry of International Trade and Industry. The main purpose of the COSS development was to implement the lessons learned from the Three Mile Island accident. The main nuclear industries in Japan participated in the project. The design concept of the operator support functions and the method to implement it were established, and the prototype systems of the COSS for BWR and PWR plants were developed. After the completion of the COSS development, the above participant group once again joined for the work on an advanced man-machine system for nuclear power plants (MMS-NPP). This eight-year project aims at realizing an advanced operator support system by applying artificial intelligence, especially knowledge engineering, and sophisticated man-machine interface devices. Its main objectives are shown. This system configuration, operating method decision system, man-machine communication system, operation and maintenance support functions and so on are described. (Kako, I.)

  3. Projecting technology change to improve space technology planning and systems management

    Science.gov (United States)

    Walk, Steven Robert

    2011-04-01

    Projecting technology performance evolution has been improving over the years. Reliable quantitative forecasting methods have been developed that project the growth, diffusion, and performance of technology in time, including projecting technology substitutions, saturation levels, and performance improvements. These forecasts can be applied at the early stages of space technology planning to better predict available future technology performance, assure the successful selection of technology, and improve technology systems management strategy. Often what is published as a technology forecast is simply scenario planning, usually made by extrapolating current trends into the future, with perhaps some subjective insight added. Typically, the accuracy of such predictions falls rapidly with distance in time. Quantitative technology forecasting (QTF), on the other hand, includes the study of historic data to identify one of or a combination of several recognized universal technology diffusion or substitution patterns. In the same manner that quantitative models of physical phenomena provide excellent predictions of system behavior, so do QTF models provide reliable technological performance trajectories. In practice, a quantitative technology forecast is completed to ascertain with confidence when the projected performance of a technology or system of technologies will occur. Such projections provide reliable time-referenced information when considering cost and performance trade-offs in maintaining, replacing, or migrating a technology, component, or system. This paper introduces various quantitative technology forecasting techniques and illustrates their practical application in space technology and technology systems management.

  4. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    OpenAIRE

    Hudson, L. N.; Newbold, T.; Contu, S.; Hill, S. L.; Lysenko, I.; De Palma, A.; Phillips, H. R.; Alhusseini, T. I.; Bedford, F. E.; Bennett, D. J.; Booth, H.; Burton, V. J.; Chng, C. W.; Choimes, A.; Correia, D. L.

    2017-01-01

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to develop global and regional statistical models of how local biodiversity responds to these measures. We describe and make free...

  5. Controlling general projective synchronization of fractional order Rossler systems

    International Nuclear Information System (INIS)

    Shao Shiquan

    2009-01-01

    This paper proposed a method to achieve general projective synchronization of two fractional order Rossler systems. First, we construct the fractional order Rossler system's corresponding approximation integer order system. Then, a control method based on a partially linear decomposition and negative feedback of state errors was utilized on the integer order system. Numerical simulations show the effectiveness of the proposed method.

  6. The Middle Eastern Regional Irrigation Management Information Systems project-update

    Science.gov (United States)

    The Middle Eastern Regional Irrigation Management Information Systems Project (MERIMIS) was formulated at a meeting of experts from the region in Jordan in 2003. Funded by the U.S. Department of State, it is a cooperative regional project bringing together participants from Israel, Jordan, Palestini...

  7. [Project summarize of "reestablishing disease prevention and control system of China"].

    Science.gov (United States)

    Hao, Mo; Yu, Jingjin; Yu, Mingzhu; Duan, Yong

    2005-01-01

    This paper introduced the project of "reestablishing the disease control and prevention system of China" in brief, including background, objectives, funding resources, researching objects and sampling methods. This project which funded by National Outstanding Younger Fund and the research fund of MOH aimed at nailing down the key problem existed in disease control and prevention system of China, demonstrating the reasons and mechanism of key problem, developing feasible policy idea and strategy. This paper also introduced some issues concerning the reestablishing of the disease control and prevention system of China: the definition of public function, the standard of human resource allocation and the standard of financing. The Centers for Disease Control and Prevention in 8 provinces, 80 cities and 80 counties have been sampled to provide information that project needed. In addition, this project also cited some data which come from the early study, in which 3 provinces, 12 counties, 49 towns, 179 villages and 9781 rural families have been sampled and investigated.

  8. Space Object and Light Attribute Rendering (SOLAR) Projection System

    Science.gov (United States)

    2017-05-08

    depicting the proposed SOLAR projection system. The installation process is shown in Fig. 3. SOLAR system comprises of a dome that houses Digitairum’s...imaging process. A fiberglass dome system was erected to make the SOLAR system a self contained facility. Calibration process was carried out to register...Separate software solutions were implemented to model the light transport processes involved in the imaging process. A fiberglass dome system was erected to

  9. Contribution of the Japan International Cooperation Agency health-related projects to health system strengthening.

    Science.gov (United States)

    Yuasa, Motoyuki; Yamaguchi, Yoshie; Imada, Mihoko

    2013-09-22

    The Japan International Cooperation Agency (JICA) has focused its attention on appraising health development assistance projects and redirecting efforts towards health system strengthening. This study aimed to describe the type of project and targets of interest, and assess the contribution of JICA health-related projects to strengthening health systems worldwide. We collected a web-based Project Design Matrix (PDM) of 105 JICA projects implemented between January 2005 and December 2009. We developed an analytical matrix based on the World Health Organization (WHO) health system framework to examine the PDM data and thereby assess the projects' contributions to health system strengthening. The majority of JICA projects had prioritized workforce development, and improvements in governance and service delivery. Conversely, there was little assistance for finance or medical product development. The vast majority (87.6%) of JICA projects addressed public health issues, for example programs to improve maternal and child health, and the prevention and treatment of infectious diseases such as AIDS, tuberculosis and malaria. Nearly 90% of JICA technical healthcare assistance directly focused on improving governance as the most critical means of accomplishing its goals. Our study confirmed that JICA projects met the goals of bilateral cooperation by developing workforce capacity and governance. Nevertheless, our findings suggest that JICA assistance could be used to support financial aspects of healthcare systems, which is an area of increasing concern. We also showed that the analytical matrix methodology is an effective means of examining the component of health system strengthening to which the activity and output of a project contributes. This may help policy makers and practitioners focus future projects on priority areas.

  10. Replacement of the Project Manager Reflected Through Activity Theory and Work-System Theory

    Science.gov (United States)

    Vartiainen, Tero; Aramo-Immonen, Heli; Jussila, Jari; Pirhonen, Maritta; Liikamaa, Kirsi

    Replacement of the project manager (RPM) is a known phenomenon in information systems (IS) projects, but scant attention is given to it in the project management or IS literature. Given its critical effects on the project business, the organization, the project team, and the project manager, it should be studied in more depth. We identified factors which make RPM occurrences inherently different and we show that work-system theory and activity theory give comprehensive lenses to advance research on RPM. For the future research on RPM we identified three objectives: experiences on RPM, process model for RPM, and organizational culture's influence on RPM occurrences.

  11. HTR-E project. High-temperature components and systems

    International Nuclear Information System (INIS)

    Breuil, E.; Exner, R.

    2002-01-01

    The HTR-E European project (four years project) is proposed for the 5th Framework Programme and concerns the technical developments needed for the innovative components of a modern HTR with a direct cycle. These components have been selected with reference to the present projects (GT-MHR, PBMR): (1) the helium turbine, the recuperator heat exchanger, the electro-magnetic bearings and the helium rotating seal; (2) the tribology. Sliding innovative components in helium environment are particularly concerned. (3) the helium purification system. Recommendations on impurities contents have to be provided in accordance with the materials proposed for the innovative components. The main outcomes expected from the HTR-E project are the design recommendations and identification of further R and D needs for these components. This will be based: (1) on experience feedback from European past helium test loops and reactors; (2) on design studies, thermal-hydraulic and structural analyses; (3) and on experimental tests

  12. Potential Use of Communications and Project Management Systems in Remote Construction Projects: The Case of Saudi Electric Company

    Directory of Open Access Journals (Sweden)

    Bhzad Sidawi

    2012-01-01

    Full Text Available Remote projects have their unique problems that are caused mainly by the remoteness of the project itself thus the loose control over management. This is due to a number of reasons such as lack of human resources and infrastructure. Research studies that were undertaken worldwide - regarding this issue- has highlighted few unique management problems. The aim of this paper is to investigate how far the IT tools would help in managing remote construction projects in the Kingdom of Saudi Arabia (KSA. Due to the lack of previous research regarding remote projects within the Gulf region and the KSA, a pilot study was conducted in 2009 to define and test the wording of questions that are part of the main survey. The main survey was undertaken on Saudi Electric Company (SEC. The study found that IT systems and tools have the potential but this potential is hindered by a number of technical, managerial, staff factors. Therefore, successful application of IT systems would require changes to the present management settings at various levels. This would ensure that the SEC is capable of achieving the full benefit from using these advanced systems.

  13. Integrated Monitoring and Surveillance System demonstration project. Phase 2 accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Singleterry, R.C.

    1997-01-01

    The paper presents the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase 2 efforts. the rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include further development of the data acquisition system and procurement of necessary hardware/software, options and associated costs for plutonium canning systems and gloveboxes, initiation of facility modifications, determination of possibly affected facility documentation, results from sensor system trade study, and preliminary storage configuration designs. Resources invested during Phase 1 and Phase 2 are summarized and budgetary requirements for completion of Phase 3 presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase 2 deliverables

  14. Development of an identification system for potential ICES projects

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-11-01

    An earlier study by Real Estate Research Corporation (RERC) provides an overview of methods for developing marketing strategies for ICES. One aim of that document was to establish an information system for identifying areas, subareas, sites, or projects with substantial growth or development activity as potential candidates for the application of ICES. This report summarizes RERC's effort to implement and test such an information system. The specific objectives of this report are: (1) identify and collect basic information on 150 large-scale construction projects; (2) identify areas of the country, i.e., states and SMSAs that evidence general growth characteristics that would support ICES applications; (3) identify regions, states, and SMSAs that display higher-than-average energy costs; and (4) identify regions, states, and SMSAs that have experienced significant activity in identified land-use sectors and subsectors. Recent development activities in the commercial, industrial, residential, institutional, and transportation sectors are detailed. Mixed-use projects are included within the commercial sector. An annotated bibliography is included. (MCW)

  15. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  16. WORK BREAKDOWN STRUCTURE FORMATION FOR IT-PROJECT OF INFORMATION SYSTEM DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Виктор Макарович ЛЕВЫКИН

    2015-06-01

    Full Text Available The approach for modeling the structure of IT-works project to create an information system as a forest domain ontology. The main features of information technology to manage such IT-projects.

  17. Multi Media Systems. International Compendium. Eleven Project Descriptions of Combined Teaching Systems in Eight Countries.

    Science.gov (United States)

    Gaudray, Francine, Comp.

    The demands made by modern technological society on the traditional educational system are briefly discussed. The remainder of the compendium describes 11 projects which are using educational technology, principally televised instruction, with success. Projects from Brazil, Canada, West Germany, France, England, Japan, Poland, and the United…

  18. Experiential learning in control systems laboratories and engineering project management

    Science.gov (United States)

    Reck, Rebecca Marie

    2015, a panel of 40 control systems faculty members, from a variety of institutions, completed a multi-round Delphi survey in order to bring them toward consensus on the common aspects of their laboratories. The following winter, 45 additional faculty members and practitioners from the control systems community completed a follow-up survey to gather feedback on the results of the Delphi survey. During the Delphi study, the panelists identified 15 laboratory objectives, 26 concepts, and 15 components that were common in their laboratories. Then in both the Delphi survey and follow-up survey each participant rated the importance of each of these items. While the average ratings differed slightly between the two groups, the order of each set of items was compared with two different tests and the order was found to be similar. Some of the common and important learning objectives include connecting theory to what is implemented and observed in the laboratory, designing controllers, and modeling and simulating systems. The most common component in both groups was Math-Works software. Some of the common concepts include block diagrams, stability, and PID control. Defining common aspects of undergraduate control systems laboratories enables common development, detailed comparisons, and simplified adaptation of equipment and experiments between campuses and programs. Throughout an undergraduate program in engineering, there are multiple opportunities for hands-on laboratory experiences that are related to course content. However, a similarly immersive experience for project management graduate students is harder to incorporate for all students in a course at once. This study explores an experiential learning opportunity for graduate students in engineering management or project management programs. The project management students enroll in a project management course. Undergraduate students interested in working on a project with a real customer enroll in a different projects

  19. Integration of project management and systems engineering: Tools for a total-cycle environmental management system

    International Nuclear Information System (INIS)

    Blacker, P.B.; Winston, R.

    1997-01-01

    An expedited environmental management process has been developed at the Idaho National Engineering and Environmental Laboratory (INEEL). This process is one result of the Lockheed Martin commitment to the US Department of Energy to incorporate proven systems engineering practices with project management and program controls practices at the INEEL. Lockheed Martin uses a graded approach of its management, operations, and systems activities to tailor the level of control to the needs of the individual projects. The Lockheed Martin definition of systems engineering is: ''''Systems Engineering is a proven discipline that defines and manages program requirements, controls risk, ensures program efficiency, supports informed decision making, and verifies that products and services meet customer needs.'''' This paper discusses: the need for an expedited environmental management process; how the system was developed; what the system is; what the system does; and an overview of key components of the process

  20. The ESPRIT project CAFE : high security digital payment systems

    NARCIS (Netherlands)

    Boly, J.P.; Bosselaers, A.; Cramer, R.; Michelsen, R.; Mjølsnes, S.F.; Muller, F.; Pedersen, T.P.; Pfitzmann, B.; Rooij, de P.; Schoenmakers, B.; Schunter, M.; Vallée, L.; Waidner, M.; Gollmann, D.

    1994-01-01

    CAFE (“Conditional Access for Europe”) is an ongoing project in the European Community's ESPRIT program. The goal of CAFE is to develop innovative systems for conditional access, and in particular, digital payment systems. An important aspect of CAFE is high security of all parties concerned, with

  1. MULTIPLE PROJECTIONS SYSTEM (MPS) - USER'S MANUAL VERSION 1.0

    Science.gov (United States)

    The report is a user's manual for version 1.0 of the Multiple Projections Systems (MPS), a computer system that can perform "what if" scenario analysis and report the final results (i.e., Rate of Further Progress - ROP - inventories) to EPA (i.e., the Aerometric Information Retri...

  2. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  3. Project development and commercialisation of on-line analysis systems

    International Nuclear Information System (INIS)

    Watt, J.S.

    2000-01-01

    A project team first in the Australian Atomic Energy Commission (AAEC) and since 1982 in CSIRO has developed many on-line analysis systems for the mineral and energy industries. The development of these projects, usually lasting 7-10 years, has followed a common pattern of laboratory R and D, field trials, commercialisation and technology transfer. This successful pattern is illustrated using examples of the development of systems for the on-line analysis of mineral slurries, for determination of the ash content of coal on conveyors, and for determination of the flow rates of oil, water and gas in pipelines. The first two systems, licensed to Australian companies, are used world-wide. They are now the market leaders for radioisotope gauges in their application field. The third, the multiphase flow meter, was licensed in 1997 to an international company. This meter has even greater potential than the other two systems for economic benefit from its use and for numbers of installations. (author)

  4. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    Science.gov (United States)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  5. Projective Synchronization of Chaotic Discrete Dynamical Systems via Linear State Error Feedback Control

    Directory of Open Access Journals (Sweden)

    Baogui Xin

    2015-04-01

    Full Text Available A projective synchronization scheme for a kind of n-dimensional discrete dynamical system is proposed by means of a linear feedback control technique. The scheme consists of master and slave discrete dynamical systems coupled by linear state error variables. A kind of novel 3-D chaotic discrete system is constructed, to which the test for chaos is applied. By using the stability principles of an upper or lower triangular matrix, two controllers for achieving projective synchronization are designed and illustrated with the novel systems. Lastly some numerical simulations are employed to validate the effectiveness of the proposed projective synchronization scheme.

  6. Systems Performance Analyses of Alaska Wind-Diesel Projects; Kotzebue, Alaska (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, I.

    2009-04-01

    This fact sheet summarizes a systems performance analysis of the wind-diesel project in Kotzebue, Alaska. Data provided for this project include wind turbine output, average wind speed, average net capacity factor, and optimal net capacity factor based on Alaska Energy Authority wind data, estimated fuel savings, and wind system availability.

  7. MODELS AND METHODS OF SAFETY-ORIENTED PROJECT MANAGEMENT OF DEVELOPMENT OF COMPLEX SYSTEMS: METHODOLOGICAL APPROACH

    Directory of Open Access Journals (Sweden)

    Олег Богданович ЗАЧКО

    2016-03-01

    Full Text Available The methods and models of safety-oriented project management of the development of complex systems are proposed resulting from the convergence of existing approaches in project management in contrast to the mechanism of value-oriented management. A cognitive model of safety oriented project management of the development of complex systems is developed, which provides a synergistic effect that is to move the system from the original (pre condition in an optimal one from the viewpoint of life safety - post-project state. The approach of assessment the project complexity is proposed, which consists in taking into account the seasonal component of a time characteristic of life cycles of complex organizational and technical systems with occupancy. This enabled to take into account the seasonal component in simulation models of life cycle of the product operation in complex organizational and technical system, modeling the critical points of operation of systems with occupancy, which forms a new methodology for safety-oriented management of projects, programs and portfolios of projects with the formalization of the elements of complexity.

  8. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project FY17 Annual Review

    Science.gov (United States)

    Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    This presentation was presented to the Integrated Aviation Systems Program at the FY17 Annual Review of the UAS-NAS project. The presentation captures the overview of the work completed by the UAS-NAS project and its subprojects.

  9. Project W-058 monitor and control system logic

    International Nuclear Information System (INIS)

    ROBERTS, J.B.

    1999-01-01

    This supporting document contains the printout of the control logic for the Project W-058 Monitor and Control System, as developed by Programmable Control Services, Inc. The logic is arranged in five appendices, one for each programmable logic controller console

  10. Calibration of an arbitrarily arranged projection moiré system for 3D shape measurement

    Science.gov (United States)

    Tang, Ying; Yao, Jun; Zhou, Yihao; Sun, Chen; Yang, Peng; Miao, Hong; Chen, Jubing

    2018-05-01

    An arbitrarily arranged projection moiré system is presented for three-dimensional shape measurement. We develop a model for projection moiré system and derive a universal formula expressing the relation between height and phase variation before and after we put the object on the reference plane. With so many system parameters involved, a system calibration technique is needed. In this work, we provide a robust and accurate calibration method for an arbitrarily arranged projection moiré system. The system no longer puts restrictions on the configuration of the optical setup. Real experiments have been conducted to verify the validity of this method.

  11. Projective Synchronization of N-Dimensional Chaotic Fractional-Order Systems via Linear State Error Feedback Control

    Directory of Open Access Journals (Sweden)

    Baogui Xin

    2012-01-01

    Full Text Available Based on linear feedback control technique, a projective synchronization scheme of N-dimensional chaotic fractional-order systems is proposed, which consists of master and slave fractional-order financial systems coupled by linear state error variables. It is shown that the slave system can be projectively synchronized with the master system constructed by state transformation. Based on the stability theory of linear fractional order systems, a suitable controller for achieving synchronization is designed. The given scheme is applied to achieve projective synchronization of chaotic fractional-order financial systems. Numerical simulations are given to verify the effectiveness of the proposed projective synchronization scheme.

  12. Switched modified function projective synchronization of hyperchaotic Qi system with uncertain parameters

    Science.gov (United States)

    Sebastian Sudheer, K.; Sabir, M.

    2010-12-01

    This work is involved with switched modified function projective synchronization of two identical Qi hyperchaotic systems using adaptive control method. Switched synchronization of chaotic systems in which a state variable of the drive system synchronize with a different state variable of the response system is a promising type of synchronization as it provides greater security in secure communication. Modified function projective synchronization with the unpredictability of scaling functions can enhance security. Recently formulated hyperchaotic Qi system in the hyperchaotic mode has an extremely broad frequency bandwidth of high magnitudes, verifying its unusual random nature and indicating its great potential for some relevant engineering applications such as secure communications. By Lyapunove stability theory, the adaptive control law and the parameter update law are derived to make the state of two chaotic systems modified function projective synchronized. Synchronization under the effect of noise is also considered. Numerical simulations are presented to demonstrate the effectiveness of the proposed adaptive controllers.

  13. A bar coding system for environmental projects

    International Nuclear Information System (INIS)

    Barber, R.B.; Hunt, B.J.; Burgess, G.M.

    1988-01-01

    This paper presents BeCode systems, a bar coding system which provides both nuclear and commercial clients with a data capture and custody management program that is accurate, timely, and beneficial to all levels of project operations. Using bar code identifiers is an essentially paperless and error-free method which provides more efficient delivery of data through its menu card-driven structure, which speeds collection of essential data for uploading to a compatible device. The effects of this sequence include real-time information for operator analysis, management review, audits, planning, scheduling, and cost control

  14. Stereoscopic Machine-Vision System Using Projected Circles

    Science.gov (United States)

    Mackey, Jeffrey R.

    2010-01-01

    A machine-vision system capable of detecting obstacles large enough to damage or trap a robotic vehicle is undergoing development. The system includes (1) a pattern generator that projects concentric circles of laser light forward onto the terrain, (2) a stereoscopic pair of cameras that are aimed forward to acquire images of the circles, (3) a frame grabber and digitizer for acquiring image data from the cameras, and (4) a single-board computer that processes the data. The system is being developed as a prototype of machine- vision systems to enable robotic vehicles ( rovers ) on remote planets to avoid craters, large rocks, and other terrain features that could capture or damage the vehicles. Potential terrestrial applications of systems like this one could include terrain mapping, collision avoidance, navigation of robotic vehicles, mining, and robotic rescue. This system is based partly on the same principles as those of a prior stereoscopic machine-vision system in which the cameras acquire images of a single stripe of laser light that is swept forward across the terrain. However, this system is designed to afford improvements over some of the undesirable features of the prior system, including the need for a pan-and-tilt mechanism to aim the laser to generate the swept stripe, ambiguities in interpretation of the single-stripe image, the time needed to sweep the stripe across the terrain and process the data from many images acquired during that time, and difficulty of calibration because of the narrowness of the stripe. In this system, the pattern generator does not contain any moving parts and need not be mounted on a pan-and-tilt mechanism: the pattern of concentric circles is projected steadily in the forward direction. The system calibrates itself by use of data acquired during projection of the concentric-circle pattern onto a known target representing flat ground. The calibration- target image data are stored in the computer memory for use as a

  15. Cost/schedule performance measurement system utilized on the Fast Flux Test Facility project

    International Nuclear Information System (INIS)

    Brown, R.K.; Frost, R.A.; Zimmerman, F.M.

    1976-01-01

    An Earned Value-Integrated Cost/Schedule Performance Measurement System has been applied to a major nonmilitary nuclear design and construction project. This system is similar to the Department of Defense Cost/Schedule Performance Measurement System. The project is the Fast Flux Test Facility (a Fuels and Materials test reactor for the Liquid Metal Fast Breeder Reactor Program) being built at the Hanford Engineering Development Laboratory, Richland, Washington, by Westinghouse Hanford Company for the U. S. Energy Research and Development Administration. Because the project was well into the construction phase when the Earned Value System was being considered, it was decided that the principles of DOD's Cost/Schedule Control System Criteria would be applied to the extent possible but no major changes in accounting practices or management systems were imposed. Implementation of this system enabled the following questions to be answered: For work performed, how do actual costs compare with the budget for that work. What is the impact of cost and schedule variances at an overall project level composed of different kinds of activities. Without the Earned Value system, these questions could be answered in a qualitative, subjective manner at best

  16. A research project to encourage system-compatible design of end-use appliances

    International Nuclear Information System (INIS)

    Dorr, D.; Key, T.; Sitzlar, G.

    1995-01-01

    Cooperative system compatibility research sponsored by the Canadian Electrical Association (CEA) and the Electric Power Research Institute (EPRI) for improving appliance performance deficiencies was described. Power producer and end-user compatibility concerns was addressed through the development of a System Compatibility Research Project. A list of project tasks was provided. The CEA and EPRI initiated a project to establish flicker response of various lighting systems, which included physical tests. Results of this project were presented and discussed. The incentives for developing switch mode power supplies with enhanced immunity to voltage fluctuations and short interruptions was discussed. It was concluded that power quality studies currently underway will provide designers with a profile of the expected utility environment for their products. System compatibility research will identify areas that should be addressed by standards bodies so that designers can apply applicable criteria objectives early in the appliance design process. These efforts were expected to encourage appropriate manufacturer criteria for compatibility by convincing buyers and sellers that there is a real pay back for this investment. 13 refs., 6 figs., 4 tabs

  17. The hotel enterprise: a business system of project business on the tourism business market

    OpenAIRE

    Berc Radisic, Branka; Basan, Lorena

    2007-01-01

    As a business system, an enterprise represents a complex, dynamic, stochastic, open and organisational system. Certain specific features of a hotel enterprise as a business system of project business result from the activity it performs and from project-based business and development management. As an enterprise based on project business, its distinguishing features include the interconnectedness of business subsystems and the overlapping a hotel enterprise’s business function.

  18. Design of management information system for nuclear industry architectural project costs

    International Nuclear Information System (INIS)

    Zhang Xingzhi; Li Wei

    1996-01-01

    Management Information System (MIS) for nuclear industry architectural project is analysed and designed in detail base on quota management and engineering budget management of nuclear industry in respect of the practice of Qinshan Second Phase 2 x 600 MW Project

  19. A visual representation system for the scheduling and management of projects

    NARCIS (Netherlands)

    Pollalis, S.N.

    1992-01-01

    A VISUAL SCHEDULING AND MANAGEMENT SYSTEM (VSMS) This work proposes a new system for the visual representation of projects that displays the quantities of work, resources and cost. This new system, called Visual Scheduling and Management System, has a built-in hierarchical system to provide

  20. Valuation of Construction Projects Based on of Quantity Scale by using Expert System

    Directory of Open Access Journals (Sweden)

    Entisar Kadhim Rasheed

    2016-02-01

    Full Text Available The subject of an valuation of quality of construction projects is one of the topics which it becomes necessary of the absence of the quantity standards in measuring the control works and the quality valuation standards in constructional projects. In the time being it depends on the experience of the workers which leads to an apparent differences in the valuation. The idea of this research came to put the standards to evaluate the quality of the projects in a special system depending on quantity scale nor quality specifying in order to prepare an expert system “ Crystal “ to apply this special system to able the engineers to valuate the quality of their projects easily and in more accurate ways.

  1. Student project of optical system analysis API-library development

    Science.gov (United States)

    Ivanova, Tatiana; Zhukova, Tatiana; Dantcaranov, Ruslan; Romanova, Maria; Zhadin, Alexander; Ivanov, Vyacheslav; Kalinkina, Olga

    2017-08-01

    In the paper API-library software developed by students of Applied and Computer Optics Department (ITMO University) for optical system design is presented. The library performs paraxial and real ray tracing, calculates 3d order (Seidel) aberration and real ray aberration of axis and non-axis beams (wave, lateral, longitudinal, coma, distortion etc.) and finally, approximate wave aberration by Zernike polynomials. Real aperture can be calculated by considering of real rays tracing failure on each surface. So far we assume optical system is centered, with spherical or 2d order aspherical surfaces. Optical glasses can be set directly by refraction index or by dispersion coefficients. The library can be used for education or research purposes in optical system design area. It provides ready to use software functions for optical system simulation and analysis that developer can simply plug into their software development for different purposes, for example for some specific synthesis tasks or investigation of new optimization modes. In the paper we present an example of using the library for development of cemented doublet synthesis software based on Slusarev's methodology. The library is used in optical system optimization recipes course for deep studying of optimization model and its application for optical system design. Development of such software is an excellent experience for students and help to understanding optical image modeling and quality analysis. This development is organized as student group joint project. We try to organize it as a group in real research and development project, so each student has his own role in the project and then use whole library functionality in his own master or bachelor thesis. Working in such group gives students useful experience and opportunity to work as research and development engineer of scientific software in the future.

  2. Function Projective Synchronization in Discrete-Time Chaotic System with Uncertain Parameters

    International Nuclear Information System (INIS)

    Chen Yong; Li Xin

    2009-01-01

    The function projective synchronization of discrete-time chaotic systems is presented. Based on backstepping design with three controllers, a systematic, concrete and automatic scheme is developed to investigate function projective synchronization (FPS) of discrete-time chaotic systems with uncertain parameters. With the aid of symbolic-numeric computation, we use the proposed scheme to illustrate FPS between two identical 3D Henon-like maps with uncertain parameters. Numeric simulations are used to verify the effectiveness of our scheme. (general)

  3. The global sustainability project and the LLNL China energy systems model

    International Nuclear Information System (INIS)

    Harris, N; Lamont, A; Stewart, J; Woodrow, C.

    1999-01-01

    The sustainability of our modern way of life is becoming a major concern of both our domestic and international policy. The Rio conference on the environment and the recent Kyoto conference on global climate change are two indications of the importance of solving global environmental problem. Energy is a key component in global sustainability since obtaining and using it has major environmental effects. If our energy systems are to be sustainable in the long run, they must be structured using technologies that have a minimal impact on our environment and resources. At the same time, they must meet practical economic requirements: they must be reasonably economical, they must meet the needs of society and they must be tailored to the resources that are available in a particular region or country. Because economic considerations and government policies both determine the development of the energy system, economic and systems modeling can help us better understand ways that new technologies and policies can be used to obtain a more sustainable system. The Global Sustainability Project has developed both economic modeling software and models to help us better understand these issues and has applied them to the analysis of energy and environmental problems in China. In the past year, the models and data developed by the project have been used to support other projects investigating the interaction of technologies and the environment. The project this year has focused on software development to improve our modeling tools and on the refinement and application of the China Energy System model. The major thrust of the software development has been improvements in the METANet economic software system. We have modified its solution algorithm to improve speed and accuracy of the solutions and to make it compatible with the SuperCode modeling system. It is planned to eventually merge the two systems to take advantage of the faster, more flexible solution algorithms of Super

  4. Design and implementation of real-time wireless projection system based on ARM embedded system

    Science.gov (United States)

    Long, Zhaohua; Tang, Hao; Huang, Junhua

    2018-04-01

    Aiming at the shortage of existing real-time screen sharing system, a real-time wireless projection system is proposed in this paper. Based on the proposed system, a weight-based frame deletion strategy combined sampling time period and data variation is proposed. By implementing the system on the hardware platform, the results show that the system can achieve good results. The weight-based strategy can improve the service quality, reduce the delay and optimize the real-time customer service system [1].

  5. Project W-320, waste retrieval sluicing system: BIO/SER implementation matrices

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This document provides verification that the safety related commitments specified in HNF-SD-WM-810-001, Addendum 1 for the Waste Retrieval Sluicing System, Project W-320 and Project W-320 Safety Evaluation Report (SER), have been implemented in the project hardware, procedures and administrative controls. Four appendices include matrices which show where the 810 commitments are implemented for limiting conditions of operation and surveillance requirements controls, administrative controls, defense-in-depth controls and controls discussed in 810 Addendum 1. A fifth appendix includes the implementation of Project W-320 SER issues and provisions

  6. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project - Systems Integration and Operationalization (SIO) Demonstration

    Science.gov (United States)

    Swieringa, Kurt

    2018-01-01

    The UAS-NAS Project hosted a Systems Integration Operationalization (SIO) Industry Day for the SIO Request for Information (RFI) on November 30, 2017 in San Diego, California. This presentation is being presented to the same group as a follow up regarding the progress that the UAS-NAS project has made on the SIO RFI. The presentation will be virtual with a teleconference

  7. Turbine Control System Replacement at NPP NEK; System Specifics, Project Experience and Lessons Learned

    International Nuclear Information System (INIS)

    Mandic, D.; Zilavy, M. J.

    2010-01-01

    The main intention of this paper is to present feedback from the implementation of the new Turbine Control System (TCS) replacement project at Nuclear Power Plant (NPP) NEK - Krsko. From the plant construction time and the first plant start-up in 1981, the NPP NEK TG (Turbine-Generator) set was controlled and monitored by DEH (Digital Electro Hydraulic) Mod II Control System designed in 70's based on P2500 CPU and number of I/O controllers and modules. The P2500 CPU and associated controllers were built with discrete TTL components (TTL logic chips) and the P2500 CPU had 64k of 16 bit words of ferrite core memory. For that time, DEH Mod II had sophisticated MCR (Main Control Room) HMI (Human Machine Interface) based on digital functional keyboards, one alphanumeric black and white CRT monitor and printer. After twenty eight years of operation and because of several other reasons that are explained in the paper, NEK decided to replace the old DEH Mod II Control system with the new Emerson Ovation based DCS (Distributed Control System) on redundant platform for the control and monitoring of secondary plant systems in the NPP Krsko (NEK), and the new system was named PDEH (Programmable Digital Electro Hydraulic) TCS. In May 2007, NEK signed the turn-key contract with Westinghouse Electric Company (WEC) for the project of replacement of the TCS, Turbine Emergency Trip System (ETS), Moisture Separator Reheater (MSR) control and some other control and monitoring functions. WEC subcontracted a number of other companies for equipment delivery, AE (Architect Engineering Design) activities, specific software development tasks (changes of KFSS - Krsko Full Scope Simulator and PIS - Process Information System interface) and field installation activities. The subject project enveloped implementation of PDEH system on three application platforms: BG KFSS (Background KFSS), FG KFSS (Foreground KFSS) and PDEH system installed in the plant. The HMI for the BG KFSS platform

  8. Airspace Systems Program: Next Generation Air Transportation System Concepts and Technology Development FY2010 Project Plan Version 3.0

    Science.gov (United States)

    Kopardekar, Parimal H.

    2010-01-01

    This document describes the FY2010 plan for the management and execution of the Next Generation Air Transportation System (NextGen) Concepts and Technology Development (CTD) Project. The document was developed in response to guidance from the Airspace Systems Program (ASP), as approved by the Associate Administrator of the Aeronautics Research Mission Directorate (ARMD), and from guidelines in the Airspace Systems Program Plan. Congress established the multi-agency Joint Planning and Development Office (JPDO) in 2003 to develop a vision for the 2025 Next Generation Air Transportation System (NextGen) and to define the research required to enable it. NASA is one of seven agency partners contributing to the effort. Accordingly, NASA's ARMD realigned the Airspace Systems Program in 2007 to "directly address the fundamental research needs of the Next Generation Air Transportation System...in partnership with the member agencies of the JPDO." The Program subsequently established two new projects to meet this objective: the NextGen-Airspace Project and the NextGen-Airportal Project. Together, the projects will also focus NASA s technical expertise and world-class facilities to address the question of where, when, how and the extent to which automation can be applied to moving aircraft safely and efficiently through the NAS and technologies that address optimal allocation of ground and air technologies necessary for NextGen. Additionally, the roles and responsibilities of humans and automation influence in the NAS will be addressed by both projects. Foundational concept and technology research and development begun under the NextGen-Airspace and NextGen-Airportal projects will continue. There will be no change in NASA Research Announcement (NRA) strategy, nor will there be any change to NASA interfaces with the JPDO, Federal Aviation Administration (FAA), Research Transition Teams (RTTs), or other stakeholders

  9. Failure of large transformation projects from the viewpoint of complex adaptive systems: Management principles for dealing with project dynamics

    NARCIS (Netherlands)

    Janssen, M.; Voort, H. van der; Veenstra, A.F.E. van

    2015-01-01

    Many large transformation projects do not result in the outcomes desired or envisioned by the stakeholders. This type of project is characterised by dynamics which are both caused by and result of uncertainties and unexpected behaviour. In this paper a complex adaptive system (CAS) view was adopted

  10. Function projective lag synchronization of fractional-order chaotic systems

    International Nuclear Information System (INIS)

    Wang Sha; Yu Yong-Guang; Wang Hu; Rahmani Ahmed

    2014-01-01

    Function projective lag synchronization of different structural fractional-order chaotic systems is investigated. It is shown that the slave system can be synchronized with the past states of the driver up to a scaling function matrix. According to the stability theorem of linear fractional-order systems, a nonlinear fractional-order controller is designed for the synchronization of systems with the same and different dimensions. Especially, for two different dimensional systems, the synchronization is achieved in both reduced and increased dimensions. Three kinds of numerical examples are presented to illustrate the effectiveness of the scheme. (general)

  11. Collaborative Systems Biology Projects for the Military Medical Community.

    Science.gov (United States)

    Zalatoris, Jeffrey J; Scheerer, Julia B; Lebeda, Frank J

    2017-09-01

    This pilot study was conducted to examine, for the first time, the ongoing systems biology research and development projects within the laboratories and centers of the U.S. Army Medical Research and Materiel Command (USAMRMC). The analysis has provided an understanding of the breadth of systems biology activities, resources, and collaborations across all USAMRMC subordinate laboratories. The Systems Biology Collaboration Center at USAMRMC issued a survey regarding systems biology research projects to the eight U.S.-based USAMRMC laboratories and centers in August 2016. This survey included a data call worksheet to gather self-identified project and programmatic information. The general topics focused on the investigators and their projects, on the project's research areas, on omics and other large data types being collected and stored, on the analytical or computational tools being used, and on identifying intramural (i.e., USAMRMC) and extramural collaborations. Among seven of the eight laboratories, 62 unique systems biology studies were funded and active during the final quarter of fiscal year 2016. Of 29 preselected medical Research Task Areas, 20 were associated with these studies, some of which were applicable to two or more Research Task Areas. Overall, studies were categorized among six general types of objectives: biological mechanisms of disease, risk of/susceptibility to injury or disease, innate mechanisms of healing, diagnostic and prognostic biomarkers, and host/patient responses to vaccines, and therapeutic strategies including host responses to therapies. We identified eight types of omics studies and four types of study subjects. Studies were categorized on a scale of increasing complexity from single study subject/single omics technology studies (23/62) to studies integrating results across two study subject types and two or more omics technologies (13/62). Investigators at seven USAMRMC laboratories had collaborations with systems biology experts

  12. Impact of Requirements Elicitation Processes on Success of Information System Development Projects

    Directory of Open Access Journals (Sweden)

    Bormane Līga

    2016-12-01

    Full Text Available Requirements articulating user needs and corresponding to enterprise business processes are a key to successful implementation of information system development projects. However, the parties involved in projects frequently are not able to agree on a common development vision and have difficulties expressing their needs. Several industry experts have acknowledged that requirements elicitation is one of the most difficult tasks in development projects. This study investigates the impact of requirements elicitation processes on project outcomes depending on the applied project development methodology.

  13. Computer-Aided Systems Engineering for Flight Research Projects Using a Workgroup Database

    Science.gov (United States)

    Mizukami, Masahi

    2004-01-01

    An online systems engineering tool for flight research projects has been developed through the use of a workgroup database. Capabilities are implemented for typical flight research systems engineering needs in document library, configuration control, hazard analysis, hardware database, requirements management, action item tracking, project team information, and technical performance metrics. Repetitive tasks are automated to reduce workload and errors. Current data and documents are instantly available online and can be worked on collaboratively. Existing forms and conventional processes are used, rather than inventing or changing processes to fit the tool. An integrated tool set offers advantages by automatically cross-referencing data, minimizing redundant data entry, and reducing the number of programs that must be learned. With a simplified approach, significant improvements are attained over existing capabilities for minimal cost. By using a workgroup-level database platform, personnel most directly involved in the project can develop, modify, and maintain the system, thereby saving time and money. As a pilot project, the system has been used to support an in-house flight experiment. Options are proposed for developing and deploying this type of tool on a more extensive basis.

  14. Optical design of ultrashort throw liquid crystal on silicon projection system

    Science.gov (United States)

    Huang, Jiun-Woei

    2017-05-01

    An ultrashort throw liquid crystal on silicon (LCoS) projector for home cinema, virtual reality, and automobile heads-up display has been designed and fabricated. To achieve the best performance and highest-quality image, this study aimed to design wide-angle projection optics and optimize the illumination for LCoS. Based on the telecentric lens projection system and optimized Koehler illumination, the optical parameters were calculated. The projector's optical system consisted of a conic aspheric mirror and image optics using either symmetric double Gauss or a large-angle eyepiece to achieve a full projection angle larger than 155 deg. By applying Koehler illumination, image resolution was enhanced and the modulation transfer function of the image in high spatial frequency was increased to form a high-quality illuminated image. The partial coherence analysis verified that the design was capable of 2.5 lps/mm within a 2 m×1.5 m projected image. The throw ratio was less than 0.25 in HD format.

  15. `95 computer system operation project

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new.

  16. '95 computer system operation project

    International Nuclear Information System (INIS)

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new

  17. Aquaponics System - An EPS@ISEP 2014 Spring Project

    OpenAIRE

    Llauradó, Ana Mesas; Docherty, Arlene; Méry, Gwénaël; Sokolowska, Natalia; Keane, Sean; Duarte, Abel José; Malheiro, Benedita; Ribeiro, Maria Cristina; Ferreira, Fernando José; Silva, Manuel; Ferreira, Paulo; Guedes, Pedro

    2015-01-01

    The goal of this project, one of the proposals of the EPS@ISEP 2014 Spring, was to develop an Aquaponics System. Over recent years Aquaponics systems have received increased attention due to its possibilities in helping reduce strain on resources within 1st and 3rd world countries. Aquaponics is the combination of Hydroponics and Aquaculture and mimics a natural environment in order to successfully apply and enhance the understanding of natural cycles within an indoor pro...

  18. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  19. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    International Nuclear Information System (INIS)

    Fishler, B.

    2011-01-01

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  20. Designing and conducting health system research projects, volume ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    These 'green modules'* found their way to Malaysia, where Indra ..... They determine nutritional and hygiene practices, alert children to dangers, provide care in ... money from taxes and donor agencies to finance the health care system. .... The principle of cost-effectiveness is important in the selection of research projects.

  1. The Cronus Distributed DBMS (Database Management System) Project

    Science.gov (United States)

    1989-10-01

    projects, e.g., HiPAC [Dayal 88] and Postgres [Stonebraker 86]. Although we expect to use these techniques, they have been developed for centralized...Computing Systems, June 1989. (To appear). [Stonebraker 86] Stonebraker, M. and Rowe, L. A., "The Design of POSTGRES ," Proceedings ACM SIGMOD Annual

  2. The Advanced Exploration Systems Water Recovery Project: Innovation on 2 Fronts

    Science.gov (United States)

    Sarguisingh, Miriam M.; Neumeyer, Derek; Shull, Sarah

    2012-01-01

    As NASA looks forward to sending humans farther away from Earth, we will have to develop a transportation architecture that is highly reliable and that can sustain life for long durations without the benefit of Earth s proximity for continuous resupply or even operational guidance. NASA has consistently been challenged with performing great feats of innovation, but particularly in this time of economic stress, we are challenged to go farther with less. The Advanced Exploration Systems (AES) projects were implemented to address both of these needs by not only developing innovative technologies, but by incorporating innovative management styles and processes that foster the needed technical innovation given a small amount of resources. This presentation explains how the AES Water Recovery Project is exhibiting innovation on both fronts; technical and process. The AES Water Recovery Project (WRP) is actively engineering innovative technologies in order to maximize the efficiency of water recovery. The development of reliable, energy-efficient, and low-mass spacecraft systems to provide environmental control and life support (ECLS) is critical to enable long-duration human missions outside of low-Earth orbit. Recycling of life support consumables is necessary to reduce resupply mass and provide for vehicle autonomy. To address this, the WRP is working on a rotary distiller that has shown enhanced performance over the state-of-the-art (SOA). Additionally, the WRP is looking at innovative ways to address issues present in the state-of-the-art (SOA) systems pertaining to toxicity and calcium scale buildup. As an AES project, the WRP has a more streamlined Skunk Works like approach to technology development intended to reduce overhead but achieve a more refined end product. The project has incorporated key partnerships between NASA centers as well as between NASA and industry. A minimal project management style has been implemented such that risks are managed and

  3. openSE: a Systems Engineering Framework Particularly Suited to Particle Accelerator Studies and Development Projects

    Energy Technology Data Exchange (ETDEWEB)

    Bonnal, P. [CERN; Féral, B. [CERN; Kershaw, K. [CERN; Nicquevert, B. [CERN; Baudin, M. [Ecole Normale Superieure; Lari, L. [ESS, Lund; Le Cardinal, J. [Chatenay-Malabry, Ecole Centrale

    2016-07-15

    Particle accelerator projects share many characteristics with industrial projects. However, experience has shown that best practice of industrial project management is not always well suited to particle accelerator projects. Major differences include the number and complexity of technologies involved, the importance of collaborative work, development phases that can last more than a decade, and the importance of telerobotics and remote handling to address future preventive and corrective maintenance requirements due to induced radioactivity, to cite just a few. The openSE framework it is a systems engineering and project management framework specifically designed for scientific facilities’ systems and equipment studies and development projects. Best practices in project management, in systems and requirements engineering, in telerobotics and remote handling and in radiation safety management were used as sources of inspiration, together with analysis of current practices surveyed at CERN, GSI and ESS.

  4. Adaptive Control and Function Projective Synchronization in 2D Discrete-Time Chaotic Systems

    International Nuclear Information System (INIS)

    Li Yin; Chen Yong; Li Biao

    2009-01-01

    This study addresses the adaptive control and function projective synchronization problems between 2D Rulkov discrete-time system and Network discrete-time system. Based on backstepping design with three controllers, a systematic, concrete and automatic scheme is developed to investigate the function projective synchronization of discrete-time chaotic systems. In addition, the adaptive control function is applied to achieve the state synchronization of two discrete-time systems. Numerical results demonstrate the effectiveness of the proposed control scheme.

  5. Debris Removal Project K West Canister Cleaning System Performance Specification

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    1999-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. Design criteria for a Canister Cleaning System to be installed in the KW Basin. This documents the requirements for design and installation of the system

  6. Anticipating and projective-anticipating synchronization of coupled multidelay feedback systems

    International Nuclear Information System (INIS)

    Hoang, Thang Manh; Nakagawa, Masahiro

    2007-01-01

    In this Letter, the model of coupled multidelay feedback systems is investigated with the schemes of anticipating and projective-anticipating synchronizations. Under these synchronization schemes, the slave anticipates the master's trajectory. Moreover, with projective-anticipating synchronization there exists a scale factor in the amplitudes of the master's and slave's state variables. In the both cases, the driving signals are in the form of multiple nonlinear transformations of delayed state variable. The Krasovskii-Lyapunov theory is used to consider the sufficient condition for synchronization. The effectiveness of the proposed schemes is confirmed by the numerical simulation of specific examples with modified Ikeda and Mackey-Glass systems

  7. Automated Procurement System (APS) revised project management plan (DS-03)

    Science.gov (United States)

    Murphy, Diane R.

    1995-01-01

    The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  8. Cost effective solutions for field development. System supplier approach to projects and operations

    International Nuclear Information System (INIS)

    Moe, P.O.

    1994-01-01

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs

  9. Systems Engineering Implementation Plan for Single-Shell Tanks (SST) Retrieval Projects

    International Nuclear Information System (INIS)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-01-01

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor

  10. Systems Engineering Implementation Plan for Single Shell Tanks (SST) Retrieval Projects

    Energy Technology Data Exchange (ETDEWEB)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-11-30

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor.

  11. Airspace Systems Program: Next Generation Air Transportation System, NextGen Systems Analysis, Integration and Evaluation Project. Version 1.0; Project Plan

    Science.gov (United States)

    Quon, Leighton

    2010-01-01

    The key objectives of the NASA ASP are to: Improve mobility, capacity efficiency and access of the airspace system. Improve collaboration, predictability, and flexibility for the airspace users. Enable accurate modeling and simulation of air transportation systems. Accommodate operations of all classes of aircraft. Maintain system safety and environmental protection. In support of these program objectives, the major goal of the NextGen-SAIE Project is to enable the transition of key capacity and efficiency improvements to the NAS. Since many aspects of the NAS are unique to specific airport or airspace environments, demand on various parts of the NAS is not expected to increase equally as system demand grows. SAIE will provide systems level analysis of the NAS characteristics, constraints, and demands such that a suite of capacity-increasing concepts and technologies for system solutions are enabled and facilitated. The technical objectives in support of this goal are the following: Integration, evaluation, and transition of more mature concepts and technologies in an environment that faithfully emulates real-world complexities. Interoperability research and analysis of ASP technologies across ATM functions is performed to facilitate integration and take ASP concepts and technologies to higher Technology Readiness Level (TRL). Analyses are conducted on the program s concepts to identify the system benefits or impacts. System level analysis is conducted to increase understanding of the characteristics and constraints of airspace system and its domains.

  12. Canister Cleaning System Final Design Report - Project A.2.A

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    2000-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The CCS is being designed to ''clean'' empty fuel canisters and lids and package them for disposal to the Environmental Restoration Disposal Facility complex. The system will interface with the KW Basin and be located in the Dummy Elevator Pit

  13. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization

  14. The Expert Project Management System (EPMS)

    Science.gov (United States)

    Silverman, Barry G.; Diakite, Coty

    1986-01-01

    Successful project managers (PMs) have been shown to rely on 'intuition,' experience, and analogical reasoning heuristics. For new PMs to be trained and experienced PMs to avoid repeating others' mistakes, it is necessary to make the knowledge and heuristics of successful PMs more widely available. The preparers have evolved a model of PM thought processes over the last decade that is now ready to be implemented as a generic PM aid. This aid consists of a series of 'specialist' expert systems (CRITIC, LIBRARIAN, IDEA MAN, CRAFTSMAN, and WRITER) that communicate with each other via a 'blackboard' architecture. The various specialist expert systems are driven to support PM training and problem solving since any 'answers' they pass to the blackboard are subjected to conflict identification (AGENDA FORMULATOR) and GOAL SETTER inference engines.

  15. Public Transportation System at the Southern Cone: New projects

    Directory of Open Access Journals (Sweden)

    Mariana Schweitzer

    2002-07-01

    Full Text Available In the context of the international restructuration of the economy and the regional integration process, according to the claim of accelerating the trade circulation, there is emerging a kind of transporting subestructure project with different characteristics from other times, which are producing a new territorial configuration.The present study has the objective to analyze the evolution of the transportation system in the South Cone and, in the context of the integration process and the economic restructuration, the new demans and which are the transformations of the involved territories since the concretion of this new actions. It is analyzed the regional transportation system related to the territory estructuration in those countries integrating the Mercosur (Argentina, Brasil, Uruguay and Paraguay, as well as in the associated nations (Bolivia and Chile.Based on the relief and diagnosis of the situation, and considering those new projects, we make a reflection about the tendency to reconcentrate the subestructure and the inversions, with the following territorial inequality that gets deeper and reproduces the territorial fragmentation in regions that receive the new projects obeying to external goals without considering the global impact in the territories’ group.

  16. Development project for a residual life evaluation system in LWR NPPs

    International Nuclear Information System (INIS)

    Hervia, F.; Francia, L.

    1995-01-01

    Economic and safety factors have stimulated the interest of Spanish NPPs towards the optimisation of NPP Residual Life Management, and consequently the need to have access to tools to support such management. This requirement has been the subject of a project, the main objectives of which are the identification of the most significant ageing factors in NPPs and their corresponding parameters, and the development of an associated integrated monitoring system. Work on the project was started by UNESA in September 1992 and is partly financed from PIE funds. This paper gives a general description of the objectives and activities of Phase 1, the Definition of the Core Project, which is nearing completion, and Phase 2, the Application of the Integrated System in a Pilot Plant. Phase 1 has confirmed the technical feasibility of the system and its suitability as a tool for the continuous evaluation of the plant condition. Furthermore, it has raised issues of great interest to NPPs. The results and conclusions of Phase 1 are currently being used to define the most suitable scope for the development and implementation of the system in the pilot plant (Phase 2), so that all the main functions of the system are tested without incurring unnecessary costs

  17. Support of an Active Science Project by a Large Information System: Lessons for the EOS Era

    Science.gov (United States)

    Angelici, Gary L.; Skiles, J. W.; Popovici, Lidia Z.

    1993-01-01

    The ability of large information systems to support the changing data requirements of active science projects is being tested in a NASA collaborative study. This paper briefly profiles both the active science project and the large information system involved in this effort and offers some observations about the effectiveness of the project support. This is followed by lessons that are important for those participating in large information systems that need to support active science projects or that make available the valuable data produced by these projects. We learned in this work that it is difficult for a large information system focused on long term data management to satisfy the requirements of an on-going science project. For example, in order to provide the best service, it is important for all information system staff to keep focused on the needs and constraints of the scientists in the development of appropriate services. If the lessons learned in this and other science support experiences are not applied by those involved with large information systems of the EOS (Earth Observing System) era, then the final data products produced by future science projects may not be robust or of high quality, thereby making the conduct of the project science less efficacious and reducing the value of these unique suites of data for future research.

  18. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  19. Adaptive modified function projective synchronization of multiple time-delayed chaotic Rossler system

    International Nuclear Information System (INIS)

    Sudheer, K. Sebastian; Sabir, M.

    2011-01-01

    In this Letter we consider modified function projective synchronization of unidirectionally coupled multiple time-delayed Rossler chaotic systems using adaptive controls. Recently, delay differential equations have attracted much attention in the field of nonlinear dynamics. The high complexity of the multiple time-delayed systems can provide a new architecture for enhancing message security in chaos based encryption systems. Adaptive control can be used for synchronization when the parameters of the system are unknown. Based on Lyapunov stability theory, the adaptive control law and the parameter update law are derived to make the state of two chaotic systems are function projective synchronized. Numerical simulations are presented to demonstrate the effectiveness of the proposed adaptive controllers.

  20. Functions and requirements document, WESF decoupling project, low-level liquid waste system

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, J.H., Fluor Daniel Hanford

    1997-02-27

    The Waste Encapsulation and Storage Facility (WESF) was constructed in 1974 to encapsulate and store cesium and strontium which were isolated at B Plant from underground storage tank waste. The WESF, Building 225-B, is attached physically to the west end of B Plant, Building 221-B, 200 East area. The WESF currently utilizes B Plant facilities for disposing liquid and solid waste streams. With the deactivation of B Plant, the WESF Decoupling Project will provide replacement systems allowing WESF to continue operations independently from B Plant. Four major systems have been identified to be replaced by the WESF Decoupling Project, including the following: Low Level Liquid Waste System, Solid Waste Handling System, Liquid Effluent Control System, and Deionized Water System.

  1. An accurate projection algorithm for array processor based SPECT systems

    International Nuclear Information System (INIS)

    King, M.A.; Schwinger, R.B.; Cool, S.L.

    1985-01-01

    A data re-projection algorithm has been developed for use in single photon emission computed tomography (SPECT) on an array processor based computer system. The algorithm makes use of an accurate representation of pixel activity (uniform square pixel model of intensity distribution), and is rapidly performed due to the efficient handling of an array based algorithm and the Fast Fourier Transform (FFT) on parallel processing hardware. The algorithm consists of using a pixel driven nearest neighbour projection operation to an array of subdivided projection bins. This result is then convolved with the projected uniform square pixel distribution before being compressed to original bin size. This distribution varies with projection angle and is explicitly calculated. The FFT combined with a frequency space multiplication is used instead of a spatial convolution for more rapid execution. The new algorithm was tested against other commonly used projection algorithms by comparing the accuracy of projections of a simulated transverse section of the abdomen against analytically determined projections of that transverse section. The new algorithm was found to yield comparable or better standard error and yet result in easier and more efficient implementation on parallel hardware. Applications of the algorithm include iterative reconstruction and attenuation correction schemes and evaluation of regions of interest in dynamic and gated SPECT

  2. Meeting of Experts on NASA's Unmanned Aircraft System (UAS) Integration in the National Airspace Systems (NAS) Project

    Science.gov (United States)

    Wolfe, Jean; Bauer, Jeff; Bixby, C.J.; Lauderdale, Todd; Shively, Jay; Griner, James; Hayhurst, Kelly

    2010-01-01

    Topics discussed include: Aeronautics Research Mission Directorate Integrated Systems Research Program (ISRP) and UAS Integration in the NAS Project; UAS Integration into the NAS Project; Separation Assurance and Collision Avoidance; Pilot Aircraft Interface Objectives/Rationale; Communication; Certification; and Integrated Tests and Evaluations.

  3. High-level-waste records management system: the NRC pilot project

    International Nuclear Information System (INIS)

    Bender, A.; Altomare, P.

    1987-01-01

    The US Nuclear Regulatory Commission (NRC) and the US Dept. of Energy (DOE) have agreed to develop a licensing support system (LSS) to address the records management requirements created by the Nuclear Waste Policy Act (NWPA). The NRC is planning to conduct a negotiated rule making the modify 10CFR2, including rules governing discovery, so that parties to the licensing process will use a single information management system as a source for all licensing-related documents. The successful demonstration of the pilot project has resulted in an operational on-line record management system for NRC-related HLW documents. Both incoming and outgoing documents are being scanned and stored on a mainframe system and on an optical disk. At this writing the optical disk portion of the system is being tested to evaluate its potential use as a future archival and distribution medium for licensing records. Experience gained from this project is being shared with other government agencies that are in the process of using similar technologies to come to grips with the complex records management problem endemic to our information-based society

  4. Organ Donation European Quality System: ODEQUS project methodology.

    Science.gov (United States)

    Manyalich, M; Guasch, X; Gomez, M P; Páez, G; Teixeira, L

    2013-01-01

    Differences in the number of organ donors among hospitals cannot be explained only by the number of intensive care unit beds used or neurologic patients treated. The figures obtained are influenced by the organizational structure of the donation process and how efficient it is. The Organ Donation European Quality System (ODEQUS) is a 3-year project (from October 2010 to September 2013) co-financed by the European Agency for Health and Consumers (EAHC20091108) which aims to define a methodology to evaluate organ procurement performance at the hospital level. ODEQUS's specific objectives are to identify quality criteria and to develop quality indicators in three types of organ donation (after brain death, after cardiac death, and living donation). Those tools will be useful for hospitals' self-assessment as well as for developing an international auditing model. A consortium has been established involving 14 associated partners from Austria, Croatia, France, Germany, Italy, Poland, Portugal, Romania, Spain, Sweden, and the United Kingdom, as well as five collaborating partners from Greece, Hungary, Malta, Slovenia, and Turkey. The project has been established in three steps: 1) Design of a survey about the use of quality tools in a wide sample of European hospitals; 2) Development of quality criteria and quality indicators by the project experts. The main fields considered have been organizational structures, clinical procedures, and outcomes; and 3) Elaboration of an evaluation system to test the quality indicators in 11 European hospitals. Two types of training have been designed and performed: one concerns the development of quality criteria and quality indicators, whereas another is focused on how to use evaluation tools. Following this methodology, the project has so far identified 131 quality criteria and developed 31 quality indicators. Currently, the quality indicators are being tested in 11 selected hospitals. Copyright © 2013 Elsevier Inc. All rights

  5. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  6. F-15 837 IFCS Intelligent Flight Control System Project

    Science.gov (United States)

    Bosworth, John T.

    2007-01-01

    This viewgraph presentation reviews the use of Intelligent Flight Control System (IFCS) for the F-15. The goals of the project are: (1) Demonstrate Revolutionary Control Approaches that can Efficiently Optimize Aircraft Performance in both Normal and Failure Conditions (2) Advance Neural Network-Based Flight Control Technology for New Aerospace Systems Designs. The motivation for the development are to reduce the chance and skill required for survival.

  7. Project development and commercialization of on-line analysis systems

    International Nuclear Information System (INIS)

    Watt, J.S.

    1997-01-01

    A project team first in the Australian Atomic Energy Commission (AAEC) and since 1982 in CSIRO has developed many on-line analysis systems for the mineral and energy industries. The development of these projects has followed a common pattern of laboratory R and D, field trials, commercialisation and technology transfer. This successful pattern is illustrated using examples of the development of systems for the on-line analysis of mineral slurries, for determination of the ash content of coal on conveyors, and for determination of the flow rates of oil, water and gas in pipelines. The first two systems are licensed to Australian companies, Amdel Ltd and Mineral Control Instrumentation Ltd. Both systems are used by industry worldwide, and are the market leaders for radioisotope gauges in their application field. The third system, the multiphase flow meter, was licensed in 1997 to Kvaerner FSSL Ltd of Aberdeen. This meter has even greater potential than the other two systems for economic benefit from its used and for numbers of installations. The on-line analysis systems have been developed to increase the productivity of the Australian mineral and energy industries, and to provide economic benefit to Australia. The economic benefit sought is predominantly improved process control based on use of the instrument, rather than from its sale. Sales of instruments are significant, however, with about A$80 million from the analysis systems and their derivatives since the 1970s. Some of the issues associated with the development of the on-line analysis system are outlined

  8. Joint verification project on environmentally friendly coal utilization systems. Joint verification project on the water-saving coal preparation system; Kankyo chowagata sekitan riyo system kyodo jissho jigyo. Shosuigata sentan system kyodo jissho jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    In this verification project, clean technology which should be spread in China was verified and the base structure for its spread was prepared for the purpose of controlling emissions of environmental pollutants associated with the coal utilization in China and of contributing to secure energy acquisition of Japan. As joint verification projects, a general rehabilitation type coal preparation system was installed in the Wangfenggang coal preparation plant, and a central control coal preparation system was installed in the Qingtan coal preparation plant. In the former, a system is verified in which optimum operation, water-saving, high quality, and heightening of efficiency can be obtained by introducing two computing systems for operation control and quality control, various measuring instruments, and analyzers to coal preparation plants where analog operation is conducted helped by Russia and Porland and have problems about quality control. In the latter, a central control system achieving water saving is verified by introducing rapid ash meters, scales, desitometers and computers to coal preparation plants having zigzag or heavy-fluid cyclon and connecting various kinds of information through network. For fiscal 1994, investigation and study were conducted. 51 figs., 9 tabs.

  9. NASA Intelligent Systems Project: Results, Accomplishments and Impact on Science Missions

    Science.gov (United States)

    Coughlan, Joseph C.

    2005-01-01

    The Intelligent Systems Project was responsible for much of NASA's programmatic investment in artificial intelligence and advanced information technologies. IS has completed three major project milestones which demonstrated increased capabilities in autonomy, human centered computing, and intelligent data understanding. Autonomy involves the ability of a robot to place an instrument on a remote surface with a single command cycle. Human centered computing supported a collaborative, mission centric data and planning system for the Mars Exploration Rovers and data understanding has produced key components of a terrestrial satellite observation system with automated modeling and data analysis capabilities. This paper summarizes the technology demonstrations and metrics which quantify and summarize these new technologies which are now available for future Nasa missions.

  10. Project scheduling method with time using MRP system – A case study: Construction project in Libya

    Directory of Open Access Journals (Sweden)

    Abdallah Ali Imetieg

    2015-04-01

    Full Text Available Materials Requirements and Planning (MRP is a system of production planning and inventory control, which is used to manage manufacturing processes. Most MRP systems are software-based and are used to ensure that the materials are available for production, that the products are available for delivery to customers, that the lowest possible material and product level is maintained in store, as well as to plan delivery schedules and purchasing activities. Upon completion of scheduling, begins the process of follow-up, which includes the achievement of the project goals in terms of quantity, quality and costs in accordance with deadlines. MRP system was applied to project of 5000 housing units in Solug area, which is close to Benghazi city, Libya, with the aim to provide necessary cash flow to pay dues on time without delay to all involved project sub-contractors and material suppliers, to ensure the smooth flow of operations, as well as to diminish costs by reduction of temporary storages and rented areas. There is a correlation between time and cost of each activity. If the required time is shorter than the scheduled time of the certain activity, it would demand more resources, which further leads to the increase in direct costs of the given activity. Therefore, the output of MRP is important since commands are issued through planning in order to launch the suggested orders with the required quantities and within the limited time period.

  11. Exploratory Shaft, Phase 1, Project B-314: Title 1 design report system design description

    International Nuclear Information System (INIS)

    Hanlen, D.F.

    1983-01-01

    The report describes the project and the project systems, the principal design bases, and principal hazards and project interfaces. This report also contains the Title 1 Estimate Summary. 5 figs., 8 tabs

  12. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    International Nuclear Information System (INIS)

    Wecks, M.D.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  13. Systems engineering management and implementation plan for Project W-465, immobilized low-activity waste storage

    International Nuclear Information System (INIS)

    Kaspar, J.R.; Latray, D.A.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-465 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  14. Kongiganak Wind Turbine Replacement and System Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Boonstra, Patrick [Intelligent Energy Systems, Anchorage, AK (United States)

    2016-12-13

    The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

  15. Nuclear employee data system (NEDS), a pilot project

    International Nuclear Information System (INIS)

    Britz, W.L.

    1984-01-01

    This paper describes a pilot project being funded by six east coast nuclear utilities: the Nuclear Employee Data System (NEDS). The NEDS is to be a customized computer-based information management system that will receive, update, and maintain in-processing information among the NEDS participating utilities. A comprehensive set of data requirements has been preliminarily identified and characterized into areas of: personal information, security information, health physics information, respiratory protective equipment information, medical information, and training information. The NEDS is expected to become operational next summer

  16. Evaluation system of Research and Development projects and services from ININ

    International Nuclear Information System (INIS)

    Reglero, R.

    1994-01-01

    To make a plan for a project is one thing; to control it are a hundred things at the same time. Because of this fact, the enterprises and Research and Development Institutions have searched better ways to manage this activities. The management system of Research and Development projects and services from ININ, is used as a recording, evaluation tracking, information and control of result instrument for these activities. The need to have update information of different activities in the working areas of ININ, such as: Projects, technical or technological services either internal or external; diffusion programs and human resources training programs; and departmental activities, has taken to the development of uniform methods of recording, evaluation tracking and control of events, which allow the standardization, compilation, analysis and reporting of the results in an easy and quick way. The elaboration of an original scheme for the evaluation system of assessment for Research and Development projects and services was started in July 1988, and the data acquisition was manual. The use of Personal Computers began at 1992. (Author)

  17. Projective Synchronization in Modulated Time-Delayed Chaotic Systems Using an Active Control Approach

    International Nuclear Information System (INIS)

    Feng Cun-Fang; Wang Ying-Hai

    2011-01-01

    Projective synchronization in modulated time-delayed systems is studied by applying an active control method. Based on the Lyapunov asymptotical stability theorem, the controller and sufficient condition for projective synchronization are calculated analytically. We give a general method with which we can achieve projective synchronization in modulated time-delayed chaotic systems. This method allows us to adjust the desired scaling factor arbitrarily. The effectiveness of our method is confirmed by using the famous delay-differential equations related to optical bistable or hybrid optical bistable devices. Numerical simulations fully support the analytical approach. (general)

  18. Community-Level Impacts Projection System (CLIPS). Final report

    Energy Technology Data Exchange (ETDEWEB)

    Monts, J.K.; Bareiss, E.R.

    1979-02-01

    The Community-Level Impacts Projection System includes a set of techniques for providing detailed advance information required for rational planning. The computerized system generates reports which enable the user: to describe the energy development activity in terms of its employment demands and spatial location; to estimate how many in-migrating workers will be required; to estimate the demographic characteristics of the in-migrating workers (e.g., how many elementary school children they will bring); to estimate how many additional secondary employment opportunities (e.g., employment in eating and drinking establishments and grocery stores) will be generated; to estimate what the local area's population levels in various age groups would be both with the project and without it; to estimate community population levels for both the impact case and the baseline case; and to estimate the approximate resource requirements and costs for providing additional municipal facilities and services (e.g., water treatment and distribution, wastewater treatment and collection, gas and electric distribution, police and fire protection, etc.)

  19. Framework to Define Structure and Boundaries of Complex Health Intervention Systems: The ALERT Project

    Directory of Open Access Journals (Sweden)

    Elena Boriani

    2017-07-01

    Full Text Available Health intervention systems are complex and subject to multiple variables in different phases of implementation. This constitutes a concrete challenge for the application of translational science in real life. Complex systems as health-oriented interventions call for interdisciplinary approaches with carefully defined system boundaries. Exploring individual components of such systems from different viewpoints gives a wide overview and helps to understand the elements and the relationships that drive actions and consequences within the system. In this study, we present an application and assessment of a framework with focus on systems and system boundaries of interdisciplinary projects. As an example on how to apply our framework, we analyzed ALERT [an integrated sensors and biosensors’ system (BEST aimed at monitoring the quality, health, and traceability of the chain of the bovine milk], a multidisciplinary and interdisciplinary project based on the application of measurable biomarkers at strategic points of the milk chain for improved food security (including safety, human, and ecosystem health (1. In fact, the European food safety framework calls for science-based support to the primary producers’ mandate for legal, scientific, and ethical responsibility in food supply. Because of its multidisciplinary and interdisciplinary approach involving human, animal, and ecosystem health, ALERT can be considered as a One Health project. Within the ALERT context, we identified the need to take into account the main actors, interactions, and relationships of stakeholders to depict a simplified skeleton of the system. The framework can provide elements to highlight how and where to improve the project development when project evaluations are required.

  20. Research notes : solar powered navigational lighting system demonstration project.

    Science.gov (United States)

    2011-04-01

    ODOT will be installing a solar powered navigational lighting system on the AstoriaMegler Bridge as part of a pilot project approved by the Federal Highways Administration (FHWA). The coastal bridge is the connection across the Columbia River on U.S....

  1. Identification of linear error-models with projected dynamical systems

    Czech Academy of Sciences Publication Activity Database

    Krejčí, Pavel; Kuhnen, K.

    2004-01-01

    Roč. 10, č. 1 (2004), s. 59-91 ISSN 1387-3954 Keywords : identification * error models * projected dynamical systems Subject RIV: BA - General Mathematics Impact factor: 0.292, year: 2004 http://www.informaworld.com/smpp/content~db=all~content=a713682517

  2. Metaphors in Managerial and Employee Sensemaking in an Information Systems Project

    DEFF Research Database (Denmark)

    Hekkala, Riitta; Stein, Mari-Klara; Rossi, Matti

    2018-01-01

    This longitudinal study looks at the metaphors used in a public sector information systems development project from the perspective of cognitive metaphor theory (Lakoff & Johnson,). We examine the use of metaphors by project team members, including representatives of the users, software developers......-intensive situations, metaphor use with unclear intentions and purpose hinders learning and creates more chaos than order. From a practical perspective, our study highlights the relevance of metaphor use for project management. We suggest that intentional selection of metaphors by management could be beneficial...

  3. Galerkin projection methods for solving multiple related linear systems

    Energy Technology Data Exchange (ETDEWEB)

    Chan, T.F.; Ng, M.; Wan, W.L.

    1996-12-31

    We consider using Galerkin projection methods for solving multiple related linear systems A{sup (i)}x{sup (i)} = b{sup (i)} for 1 {le} i {le} s, where A{sup (i)} and b{sup (i)} are different in general. We start with the special case where A{sup (i)} = A and A is symmetric positive definite. The method generates a Krylov subspace from a set of direction vectors obtained by solving one of the systems, called the seed system, by the CG method and then projects the residuals of other systems orthogonally onto the generated Krylov subspace to get the approximate solutions. The whole process is repeated with another unsolved system as a seed until all the systems are solved. We observe in practice a super-convergence behaviour of the CG process of the seed system when compared with the usual CG process. We also observe that only a small number of restarts is required to solve all the systems if the right-hand sides are close to each other. These two features together make the method particularly effective. In this talk, we give theoretical proof to justify these observations. Furthermore, we combine the advantages of this method and the block CG method and propose a block extension of this single seed method. The above procedure can actually be modified for solving multiple linear systems A{sup (i)}x{sup (i)} = b{sup (i)}, where A{sup (i)} are now different. We can also extend the previous analytical results to this more general case. Applications of this method to multiple related linear systems arising from image restoration and recursive least squares computations are considered as examples.

  4. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  5. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  6. Geographic information system development in the CARETS project

    Science.gov (United States)

    Mitchell, William B.; Fegeas, Robin G.; Fitzpatrick, Katherine A.; Hallam, Cheryl A.

    1977-01-01

    Experience in the development of a geographic information system to support the CARETS project has confirmed the considerable advantages that may accrue by paralleling the system development with a rational and balanced system production effort which permits the integration of the education and training of users with interim deliverable products to them. Those advantages include support for a long-term staff plan that recognizes substantial staff changes through system development and implementation, a fiscal plan that provides continuity in resources necessary for total system development, and a feedback system which allows the user to communicate his experiences in using the system. Thus far balance between system development and system production has not been achieved because of continuing large-scale spatial data processing requirements coupled with strong and insistent demands from users for immediately deliverable products from the system. That imbalance has refocussed staffing and fiscal plans from long-term system development to short- and near-term production requirements, continuously extends total system development time, and increases the possibility that later system development may reduce the usefulness of current interim products.

  7. Some principles of automated control systems construction with project organizational structure

    OpenAIRE

    Kovalenko, Ihor I.; Puhachenko, Kateryna S.

    2013-01-01

    The main principles of automated control systems construction with project organizational structures have been considered and the process flow sheet  for organizational systems control has been proposed. The architectural elements of the organizational system have been introduced and described. The instrumental tools of the graphodynamic systems theory have been used for the simulation modeling of hierarchical structures.

  8. Success probability orientated optimization model for resource allocation of the technological innovation multi-project system

    Institute of Scientific and Technical Information of China (English)

    Weixu Dai; Weiwei Wu; Bo Yu; Yunhao Zhu

    2016-01-01

    A success probability orientated optimization model for resource al ocation of the technological innovation multi-project system is studied. Based on the definition of the technological in-novation multi-project system, the leveling optimization of cost and success probability is set as the objective of resource al ocation. The cost function and the probability function of the optimization model are constructed. Then the objective function of the model is constructed and the solving process is explained. The model is applied to the resource al ocation of an enterprise’s technological innovation multi-project system. The results show that the pro-posed model is more effective in rational resource al ocation, and is more applicable in maximizing the utility of the technological innovation multi-project system.

  9. Implementing Earned Value Management in the CxP EVA Systems Project Office

    Science.gov (United States)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  10. T-x projections of phase diagrams of the MeF-BeF2 systems

    International Nuclear Information System (INIS)

    Korenev, Yu.M.; Rykov, A.N.; Novoselova, A.V.

    1976-01-01

    The T-x projections of the state diagrams of the systems MeF-BeF 2 (Me=Li-Rb) have been plotted. Transformation of P-x cross sections of the system state diagrams with decreasing temperature have been considered with the aid, of the general view of T-x projections. The nature of sublimation of the compounds formed in these systems is discussed

  11. Design project of fast subcritical system 'Mala Lasta'

    International Nuclear Information System (INIS)

    Milosevic, M.; Stefanovic, D.; Popovic, D.; Pesic, M.; Zavaljevski, N.; Nikolic, D.; Arsenovic, M.

    1988-10-01

    This report contains two parts. Part one covers the objective and fundamental elements for the choice of fast subcritical system 'Mala Lasta', review of the existing fast subcritical assemblies, and a description of the available domestic computer codes applied for calculating neutron reactor parameters. Comparison of results obtained by these codes for a number of existing subcritical assemblies was used for the choice of the design project described in part two of this report. It contains detailed description of the operating parameters of the chosen subcritical system based on the obtained calculated parameters

  12. Project-based production and project management: Findings and trends in research on temporary systems in multiple contexts

    Directory of Open Access Journals (Sweden)

    Tinus Pretorius

    2014-02-01

    Full Text Available Globalisation is challenging almost every aspect of the political, economic, social and technological environment. Organisations, whether public or private, have to adapt their strategies and operations to stay competitive and efficient. Historically, organisations adopted project-based operations as a mode to stay competitive, although the applications tended to be the oneoff type of operations such as construction and system development projects (Edum-Fotwe & McCaffer, 2000. As the world changed from an industrially driven to a more knowledge driven economy and the pace of continuous change became more intense, organisations adopted a project-based mode of operations on a broader scale. The knowledge economy lead to the creation of many service orientated industries. Organisations started facing portfolios of projects where the nature of these projects differed in technological complexity, urgency, customer value and social impact (Gutjahr & Froeschl, 2013. Based on their experience with more technically orientated projects, organisations focused their attention more intensely on new project management methods, tools and processes and not necessarily on the human and organisational interfaces. This paradigm changed however, especially since the 1980s and more and more organisations adopted temporary organisational forms (Bakker, 2010 in order to improve their competitiveness. The contributions in this special edition of the South African Journal of Economic and Management Sciences have a common focus on the importance of the human and organisational interface of project-based operations on project success. The purpose of this concluding article is to analyse the findings and recommendations in these papers and to detect trends and future research opportunities in the field of project-based operations.

  13. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    Science.gov (United States)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  14. Witwatersrand Water Ingress Project - Information Management System (WWIPIMS), South Africa

    Energy Technology Data Exchange (ETDEWEB)

    Hild, S.; Sieste, M.; Barth, A.; Rudinskaya, J. [Beak Consultants GmbH, Freiberg (Germany); Croukamp, L.; Roos, M. [Council for Geoscience (CGS), Pretoria (South Africa)

    2006-07-01

    The Witwatersrand Water Ingress Project at the Council for Geoscience, South Africa (CGS) deals with an inventory, a risk assessment and the development of rehabilitation strategies for abandoned mining sites in the Witwatersrand Mining Basin. The main focus is the prevention of water ingress and to understand the future decanting scenario. An Information Management System consisting of both a relational database and an application for the Witwatersrand Water Ingress Project is established for accessing and managing all project-related data. This easy to use application makes the data available to all staff at the CGS via several modules as well as a GIS-component for accessing and querying spatial data. This will enable the scientists to derive further knowledge of the water flowing processes by directly using all of the existing up-to-date data. Many additional functions, such as the support for map printing on demand, extensive possibilities for inquiries, data import and export, diagrams and a GIS-viewer for spatial inquiries do complete the system. (orig.)

  15. TARZAN: A REMOTE TOOL DEPLOYMENT SYSTEM FOR THE WEST VALLEY DEVELOPMENT PROJECT

    International Nuclear Information System (INIS)

    Thompson, Bruce R.; Veri, James

    1999-01-01

    RedZone Robotics, Inc. undertook a development project to build Tarzan, a Remote Tool Delivery system to work inside nuclear waste storage tanks 8D-1 and 8D-2 at the West Valley Demonstration Project (WVDP). The removal of waste deposits from large storage tanks poses significant challenges during tank operations and closure. Limited access, the presence of chemical, radiological, and /or explosive hazards, and the need to deliver retrieval equipment to all regions of the tank exceed the capabilities of most conventional methods and equipment. Remotely operated devices for mobilizing and retrieving waste materials are needed. Some recent developments have been made in this area. However, none of these developments completely and cost-effectively address tanks that are congested with internal structures (e.g., support columns, cooling coils, fixed piping, etc.). The Tarzan system consists of the following parts: Locomotor which is deployed in the tank for inspection and cleanup; Hydraulic power unit providing system power for the locomotor and deployment unit; and Control system providing the man machine interface to control, coordinate and monitor the system. This document presents the final report on the Tarzan project

  16. Potential implementation of light steel housing system for affordable housing project in Malaysia

    Science.gov (United States)

    Saikah, M.; Kasim, N.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. A.

    2017-11-01

    An unparalleled number between housing demand and housing supply in Malaysia has increased the housing prices, which gives consequences to the homeownership issue. One way to reduce the housing price is by faster increase the number of affordable housing, but the construction sector faces difficulties in delivering as expected number by using conventional and current industrialised building system (IBS) due to the issue related high project cost, time and labour. Therefore, light steel housing (LSH) system as one of another type of IBS method can be utilised in housing construction project. This method can replace the conventional method that was currently used in the construction of affordable housing project. The objectives of this study are to identify the potential of LSH and influencing factors of system implementation. This is an initial stage to review the previous study related to LSH implementation in developed and developing countries. The previous study will be analysed regarding advantages and disadvantages of LSH and factors that influence the implementation of the system. Based on the literature review it is expected to define the potential and influencing factors of the LSH system. The findings are meaningful in framing and enhance construction housing method of an affordable housing project in Malaysia.

  17. A New Project-Based Curriculum of Design Thinking with Systems Engineering Techniques

    NARCIS (Netherlands)

    Haruyama, S.; Kim, S.K.; Beiter, K.A.; Dijkema, G.P.J.; De Weck, O.L.

    2012-01-01

    We developed a new education curriculum called "ALPS" (Active Learning Project Sequence) at Keio University that emphasizes team project-based learning and design thinking with systems engineering techniques. ALPS is a 6 month course, in which students work as a team and design and propose

  18. The Gtz system management applied to photovoltaic rural electrification projects

    Energy Technology Data Exchange (ETDEWEB)

    Rosenthal, Pablo [Brendel Proper, (Bolivia)]|[GTZ-Cooperacion Tecnica de la Republica de Alemania, (Germany)

    1995-12-31

    The GTZ (Federal Republic of Germany Technical Cooperation Society) has developed a general project design system, particularly for Renewable Energy, that systematically covers all aspects necessary in their planning and implementation, so that their effects are sustainable in the long run, and cover as well all the requirements of a determined diffusion. This is what they have called System Management. This methodology of project implementation can be described as capable of being applied to any action area, and has already proved and validated its efficiency in projects where it has been applied. The main reason for its use is based on the correction of previous experiences with projects that had a tendency towards one area of action alone, in a much too exclusive way -mainly the technological- neglecting important aspects in the sustainability of technologies being introduced. The experience of PROPER - Bolivia (Programa para la difusion de energias renovables), who has been applying this system to its projects, is being used as a methodological basis. PROPER started in 1991, and is programed to last until September or 1996. Among the main components being described in the system`s methodology, in the particular case of PHOTOVOLTAIC RURAL ELECTRIFICATION PROJECTS, stand out the areas of Technological Transference; Training; Diffusion; Financing; Energy Policy; Planning, Monitoring, and Evaluation; and Support and Follow-up to the supply and demand. [Espanol] La GTZ (Sociedad de Cooperacion Tecnica de la Republica Federal de Alemania) ha desarrollado un proyecto de sistema de diseno general, particularmente para Energia Renovable, que cubre sistematicamente todos los aspectos necesarios en su planeacion y puesta en practica , de tal manera que sus efectos son a la larga sustentables y cubren, asimismo todos los requerimientos de una difusion determinada. Esto es lo que han llamado {sup A}dministracion del Sistema{sup .} Esta metodologia de puesta en practica

  19. The Gtz system management applied to photovoltaic rural electrification projects

    Energy Technology Data Exchange (ETDEWEB)

    Rosenthal, Pablo [Brendel Proper, (Bolivia); [GTZ-Cooperacion Tecnica de la Republica de Alemania, (Germany)

    1996-12-31

    The GTZ (Federal Republic of Germany Technical Cooperation Society) has developed a general project design system, particularly for Renewable Energy, that systematically covers all aspects necessary in their planning and implementation, so that their effects are sustainable in the long run, and cover as well all the requirements of a determined diffusion. This is what they have called System Management. This methodology of project implementation can be described as capable of being applied to any action area, and has already proved and validated its efficiency in projects where it has been applied. The main reason for its use is based on the correction of previous experiences with projects that had a tendency towards one area of action alone, in a much too exclusive way -mainly the technological- neglecting important aspects in the sustainability of technologies being introduced. The experience of PROPER - Bolivia (Programa para la difusion de energias renovables), who has been applying this system to its projects, is being used as a methodological basis. PROPER started in 1991, and is programed to last until September or 1996. Among the main components being described in the system`s methodology, in the particular case of PHOTOVOLTAIC RURAL ELECTRIFICATION PROJECTS, stand out the areas of Technological Transference; Training; Diffusion; Financing; Energy Policy; Planning, Monitoring, and Evaluation; and Support and Follow-up to the supply and demand. [Espanol] La GTZ (Sociedad de Cooperacion Tecnica de la Republica Federal de Alemania) ha desarrollado un proyecto de sistema de diseno general, particularmente para Energia Renovable, que cubre sistematicamente todos los aspectos necesarios en su planeacion y puesta en practica , de tal manera que sus efectos son a la larga sustentables y cubren, asimismo todos los requerimientos de una difusion determinada. Esto es lo que han llamado {sup A}dministracion del Sistema{sup .} Esta metodologia de puesta en practica

  20. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  1. Installation and commissioning of operation nuclear power plant reactor protection system modernization project

    International Nuclear Information System (INIS)

    Lu Weiwei

    2010-01-01

    Qinshan Nuclear Power Plant is the first nuclear power plant in mainland China; it is also the first one which realizes the modernization of analog technology based Reactor Protection System in the operation nuclear power plant of China. The implementation schedule is the shortest one which use same digital technology platform (TELEPERM XS of AREVA NP) to modifying the safety class I and C system in the world, the whole project spent 28 months from equipment contract signed to putting system into operation. It open up a era for operation nuclear power plant using mature digital technology to make safety class I and C system modernization in China. The important practical significance of this successful project is very obvious. This article focus on two important project stage--equipment installation and system commissioning, it is based on a large number of engineering implementation fact, it covers the problems and solutions happened during the installation and commission. The purpose of the article is to share the experience and lessons of safety I and C system modernization for other operation nuclear power plant. (authors)

  2. THE SYSTEM OF PROCESSES AND PROJECTS OF THE AIRCRAFT AIRWORTHINESS MAINTENANCE

    Directory of Open Access Journals (Sweden)

    Alexander A. Itskovich

    2018-01-01

    Full Text Available The concept of the aviation enterprise as a unified system of processes and projects of the aircraft airworthiness maintenance (AAM is presented. The relevance of project management tools usage, including the transport branch, is noted; the examples of successful implementation of the development projects at domestic enterprises manufacturing aircraft engines are given. A scheme for the classification of the AAM projects and processes, reflecting their interrelationship, is proposed. The operational activity of the enterprise is a combination of its business processes. The company selects plans and implements the relevant projects for the business processes optimization. At the same time, the projects themselves are the objects of management based on standardized processes. The processes of project management and the main processes of the enterprise are also interrelated and can be objects included in the unified regulations of its units. Increasing the efficiency of operational processes and processes of the aviation enterprise management is the goal of development projects, which are divided into investment projects and organizational changes projects.Limitation of organizational and financial resources of the company requires the identification and systematization of all projects and processes, while the application of project management standards allows to analyze the opportunities and to determine the sequence of their implementation. The importance of accumulating experience of completed projects is shown; the results can become typical methods for planning, organizing the implementation and monitoring of AAM projects. Specific forms of the project management standards implementation for AN-124-100 constructive modification project in LLC Volga-Dnepr Airlines are demonstrated: the control events plan and the project team formation.

  3. PROJECT MANAGEMENT INFORMATION SYSTEM: STUDY IN SMALL AND MEDIUM ENTERPRISES OF INDUSTRIAL AUTOMATION

    Directory of Open Access Journals (Sweden)

    Paulo Eduardo Mondin

    2016-12-01

    Full Text Available This article aims to analyze the structuring stage and use of information systems in project management in small and medium-sized companies in the business of providing services in industrial automation. Information systems applied to project management - SIGPs can contribute to decision-making on projects, assisting in the management of reliable information in real time, making it a natural choice for most companies looking to increase performance management of their projects. The research method used was multiple case study, in line with the explanatory nature of the study, when to investigate and perform analytical comparisons on how small and medium-sized enterprises of the studied branch structure and use the SIGPs, considering the contemporary character theme and the possibility of direct observation of the object of study, in addition to conducting interviews. The main results were identified the main gaps in project management in companies and research as the management characteristics of these SMEs have influence in how their projects are managed. It was observed that there is a predominance of features involving scope, time and resources on projects, whereas aspects related to costs, risks, quality, procurement and communications have unimpressive results in relation to structuring.

  4. Real-Time Projection-Based Augmented Reality System for Dynamic Objects in the Performing Arts

    Directory of Open Access Journals (Sweden)

    Jaewoon Lee

    2015-02-01

    Full Text Available This paper describes the case study of applying projection-based augmented reality, especially for dynamic objects in live performing shows, such as plays, dancing, or musicals. Our study aims to project imagery correctly inside the silhouettes of flexible objects, in other words, live actors or the surface of actor’s costumes; the silhouette transforms its own shape frequently. To realize this work, we implemented a special projection system based on the real-time masking technique, that is to say real-time projection-based augmented reality system for dynamic objects in performing arts. We installed the sets on a stage for live performance, and rehearsed particular scenes of a musical. In live performance, using projection-based augmented reality technology enhances technical and theatrical aspects which were not possible with existing video projection techniques. The projected images on the surfaces of actor’s costume could not only express the particular scene of a performance more effectively, but also lead the audience to an extraordinary visual experience.

  5. Management systems oriented to projects: need for its implementation in sports academic institutions

    Directory of Open Access Journals (Sweden)

    Maidelyn Díaz Pérez

    2017-12-01

    Full Text Available The literature refers to the need that all academic institutions have today to use information systems articulated with the different processes that the organization executes. The idea of using this type of system is to convert the available information into knowledge that represents a competitive advantage for the organization. However, despite being a strength for any organization both to manage their strategic information and to manage the information generated by research projects, they are still not widely used. The reality shows that the academic sports institutions of the country and mainly the faculties of physical culture lack a culture in the use of systems to manage different substantive tasks of the center, such as the activity of research projects. It is estimated that if they rely more on the optimal use of the information and knowledge they have at the group level, all their scientific production indicators will be significantly increased. From this scenario, this research aims to expose the main strengths of information and knowledge management systems, mainly those aimed at projects for the stimulation of their use and implementation in academic institutions associated with sports. To achieve this objective, the logical historical method, direct observation, the method of analysis and synthesis, etc. were used. And among the main results obtained in this research there  is the relevance of the use of information management systems and knowledge aimed at projects to contribute to the promotion and success of research activities generated by projects.

  6. Optimized design for the scattering with angular limitation in projection electron-beam lithography based electron projection system

    International Nuclear Information System (INIS)

    Xiu, K.; Gibson, J. M.

    2000-01-01

    We investigate the design for a scattering with angular limitation in projection electron-beam lithography (SCALPEL) based electron projection system with a demagnification of -4. By a ''field-flip'' process we can construct a doublet in which the magnetic field has a flat feature in most of the optic column but opposite sign at two sides connected by a sharp transition region. Such a theoretical model can give a near zero chromatic aberration of rotation and much smaller field curvature and astigmatism. Compared with the conventional doublet, the total image blur caused by aberrations at 1/√(2) mm off-axis distance and 1.5 mrad semiangle aperture at the mask side is about only 24 nm for a column length of 400 mm. A shorter column, less than the current 400 mm, is also favored for further reducing the total aberration. These guarantee that we can choose a much larger aperture angle (compared with present 0.5 mrad) and beam current density in such a SCALPEL projection system to achieve higher throughput while still maintaining current resolution. A practical issue for possible magnetic lens design is also discussed. (c) 2000 American Vacuum Society

  7. Realization of economic evaluation expert system for uranium mine project

    International Nuclear Information System (INIS)

    Wang Haifeng

    1993-01-01

    By studying the EVALUATOR, economic evaluation expert system of uranium mine project, the theoretical fundamentals of expert system, principle of inference mechanism, implementation of knowledge base, realization of explanation mechanism, acquisition of domain knowledge and representation of knowledge were described, especially the subjective Bayes approach for inexact reasoning problem used in EVALUATOR was discussed in detail

  8. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W; Syffus, Rainer

    2014-01-01

    This book offers a timely review of map projections including sphere, ellipsoid, rotational surfaces, and geodetic datum transformations. Coverage includes computer vision, and remote sensing space projective mappings in photogrammetry.

  9. High-resolution laser-projection display system using a grating electromechanical system (GEMS)

    Science.gov (United States)

    Brazas, John C.; Kowarz, Marek W.

    2004-01-01

    Eastman Kodak Company has developed a diffractive-MEMS spatial-light modulator for use in printing and display applications, the grating electromechanical system (GEMS). This modulator contains a linear array of pixels capable of high-speed digital operation, high optical contrast, and good efficiency. The device operation is based on deflection of electromechanical ribbons suspended above a silicon substrate by a series of intermediate supports. When electrostatically actuated, the ribbons conform to the supporting substructure to produce a surface-relief phase grating over a wide active region. The device is designed to be binary, switching between a reflective mirror state having suspended ribbons and a diffractive grating state having ribbons in contact with substrate features. Switching times of less than 50 nanoseconds with sub-nanosecond jitter are made possible by reliable contact-mode operation. The GEMS device can be used as a high-speed digital-optical modulator for a laser-projection display system by collecting the diffracted orders and taking advantage of the low jitter. A color channel is created using a linear array of individually addressable GEMS pixels. A two-dimensional image is produced by sweeping the line image of the array, created by the projection optics, across the display screen. Gray levels in the image are formed using pulse-width modulation (PWM). A high-resolution projection display was developed using three 1080-pixel devices illuminated by red, green, and blue laser-color primaries. The result is an HDTV-format display capable of producing stunning still and motion images with very wide color gamut.

  10. Data management strategies for multinational large-scale systems biology projects.

    Science.gov (United States)

    Wruck, Wasco; Peuker, Martin; Regenbrecht, Christian R A

    2014-01-01

    Good accessibility of publicly funded research data is essential to secure an open scientific system and eventually becomes mandatory [Wellcome Trust will Penalise Scientists Who Don't Embrace Open Access. The Guardian 2012]. By the use of high-throughput methods in many research areas from physics to systems biology, large data collections are increasingly important as raw material for research. Here, we present strategies worked out by international and national institutions targeting open access to publicly funded research data via incentives or obligations to share data. Funding organizations such as the British Wellcome Trust therefore have developed data sharing policies and request commitment to data management and sharing in grant applications. Increased citation rates are a profound argument for sharing publication data. Pre-publication sharing might be rewarded by a data citation credit system via digital object identifiers (DOIs) which have initially been in use for data objects. Besides policies and incentives, good practice in data management is indispensable. However, appropriate systems for data management of large-scale projects for example in systems biology are hard to find. Here, we give an overview of a selection of open-source data management systems proved to be employed successfully in large-scale projects.

  11. GlobePort Faces Global Business Challenges--Assessing the Organizational Side of Information Systems Projects

    Science.gov (United States)

    Ghosh, Biswadip

    2011-01-01

    Published studies have reported that Information System (IS) projects succeed or fail based on how effectively the organizational issues were understood and addressed in the specification, development and implementation stages of the project. This is particularly true in the design and delivery of Inter-Organizational Systems (IOS) that can affect…

  12. Decision-Oriented Project Ranking for Asset Management System: Rail Net Denmark

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Moshøj, Claus Rehfeld; Timm, Henrik

    2007-01-01

    is to apply a modified project ranking methodology: Asset Management System Priority Module (AMS-PM), which is a practical tool for assessing and ranking various project proposals in a straightforward manner. The methodology is set-out by a multi-criteria approach where weights are applied ultimately...... resulting in priority indices for the state-of-repair data. This paper is disposed as follows; firstly, a description of the Asset Management system is set-up including an overview of the state-of-repair data and the case study. Secondly, is the AMS-PM software model implemented through an exploratory case......The Danish rail net operator, Rail Net Denmark, has through the past years built up an Asset Management system, containing a certain percentile of all the company’s assets. This paper contains an elaborate overview on how to strengthen the system seen from a decision-support perspective. The focus...

  13. The development of the human exploration demonstration project (HEDP), a planetary systems testbed

    Science.gov (United States)

    Chevers, Edward S.; Korsmeyer, David J.

    1993-01-01

    The Human Exploration Demonstration Project (HEDP) is an ongoing task at the National Aeronautics and Space Administration's Ames Research Center to address the advanced technology requirements necessary to implement an integrated working and living environment for a planetary surface habitat. The integrated environment will consist of life support systems, physiological monitoring of project crew, a virtual environment workstation, and centralized data acquisition and habitat systems health monitoring. There will be several robotic systems on a simulated planetary landscape external to the habitat environment to provide representative work loads for the crew. This paper describes the status of the HEDP after one year, the major facilities composing the HEDP, the project's role as an Ames Research Center testbed, and the types of demonstration scenarios that will be run to showcase the technologies.

  14. Meta-Assessment in a Project-Based Systems Engineering Course

    Science.gov (United States)

    Wengrowicz, Niva; Dori, Yehudit Judy; Dori, Dov

    2017-01-01

    Project-based learning (PBL) facilitates significant learning, but it poses a major assessment challenge for assessing individual content knowledge. We developed and implemented an assessment approach and tool for a mandatory undergraduate systems engineering PBL-based course. We call this type of assessment "student-oriented"…

  15. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  16. Concepts, Operations, and Feasibility of a Projection-Based Variation Control System

    DEFF Research Database (Denmark)

    Stanciulescu, Stefan; Berger, Thorsten; Walkingshaw, Eric

    2016-01-01

    on a subset of all variants could ease the engineering of highly configurable software. We investigate the potential of one kind of such tools: projection-based variation control systems. For such systems we aim to understand: (i) what end-user operations they need to support, and (ii) whether they can...... realize the actual evolution of real-world, highly configurable software. We conduct an experiment that investigates variability-related evolution patterns and that evaluates the feasibility of a projection-based variation control system by replaying parts of the history of a highly configurable real......Highly configurable software often uses preproces- sor annotations to handle variability. However, understanding, maintaining, and evolving code with such annotations is difficult, mainly because a developer has to work with all variants at a time. Dedicated methods and tools that allow working...

  17. Project W-049H collection system Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Carrigan, M.C.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the collection system equipment installed as Pump Station No. 1 (225-W) and Pump Station No. 2 (225-E) have been installed in accordance with the design documents and function as required by the project criteria. This will be a wet test with potable water being introduced into the pump pits to test for leakage. Potable water will also be employed in the testing of the pumps and related mechanical equipment. All Instrument and Control equipment related to the pump stations will be checked electronically with simulated inputs/outputs when actual input/output signals are unavailable. Water from Pump Station 1 will be moved through the TEDF piping system and discharged into the disposal ponds. This will check the proper function of the air/vac valves not tested during construction, and the automated samplers

  18. A Web-Based Monitoring System for Multidisciplinary Design Projects

    Science.gov (United States)

    Rogers, James L.; Salas, Andrea O.; Weston, Robert P.

    1998-01-01

    In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary computational environments, is defined as a hardware and software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, integrated with an existing framework, can improve these areas of weakness. This paper describes a Web-based system that optimizes and controls the execution sequence of design processes; and monitors the project status and results. The three-stage evolution of the system with increasingly complex problems demonstrates the feasibility of this approach.

  19. Secure Intra-Body Wireless Communications (SIWiC) System Project

    Science.gov (United States)

    Ahmad, Aftab; Doggett, Terrence P.

    2011-01-01

    SIWiC System is a project to investigate, design and implement future wireless networks of implantable sensors in the body. This futuristic project is designed to make use of the emerging and yet-to-emerge technologies, including ultra-wide band (UWB) for wireless communications, smart implantable sensors, ultra low power networking protocols, security and privacy for bandwidth and power deficient devices and quantum computing. Progress in each of these fronts is hindered by the needs of breakthrough. But, as we will see in this paper, these major challenges are being met or will be met in near future. SIWiC system is a network of in-situ wireless devices that are implanted to coordinate sensed data inside the body, such as symptoms monitoring collected internally, or biometric data collected of an outside object from within the intra-body network. One node has the capability of communicating outside the body to send data or alarm to a relevant authority, e.g., a remote physician.

  20. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification

    International Nuclear Information System (INIS)

    BEVINS, R.R.

    2000-01-01

    This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated during the second phase of the W314 Project to cover the second phase of the project's scope

  1. Air Traffic Control: Status of FAA's Implementation of the Display System Replacement Project

    National Research Council Canada - National Science Library

    1999-01-01

    ...) implementation of the Display System Replacement (DSR) project. DSR, which replaces the controllers' workstations and other equipment in the nation's en route centers, is one of FAA's major projects under the air traffic control modernization program...

  2. MANAGING THE INTERACTION OF RESOURCE DISTRIBUTION IN PROJECT MANAGEMENT OF IMPLEMENTATION AND FUNCTIONING OF EMERGENCY CALL SYSTEMS

    Directory of Open Access Journals (Sweden)

    Дмитро Сергійович КОБИЛКІН

    2016-02-01

    Full Text Available There have been proposed to use a mobile module "Resources manager" and its component model – scheme for managing the distribution of resources during the project management of implementation and functioning of System 112 in Ukraine. Are described the formalized tasks of performance the processes of managing the model – scheme at all stages of the projects life cycle. Also is developed the model – scheme interaction the blocks of the mobile module of resource management at the System 112 project. It describes the step by step interaction of blocks project management with the project data for successful project implementation and obtaining a product of the project, pointing out the environmental impact of the project on each of the project blocks. The conclusions about the expediency and efficiency of implementation of model – scheme in conditions of managing the emergency call systems at a single number were made.

  3. Overview and status of the prototype project for Wendelstein 7-X control system

    Energy Technology Data Exchange (ETDEWEB)

    Schacht, Joerg [Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, Wendelsteinstrasse 1, D-17491 Greifswald (Germany)], E-mail: joerg.schacht@ipp.mpg.de; Bluhm, Torsten; Herbst, Uwe; Hennig, Christine; Heinrich, Stefan; Kuehner, Georg; Koester, Erik; Laqua, Heike; Lewerentz, Marc; Marquardt, Mirco; Meyer, Christiane; Mueller, Ina; Pingel, Steffen; Sachtleben, Juergen; Spring, Anett; Werner, Andreas; Woelk, Andreas [Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, Wendelsteinstrasse 1, D-17491 Greifswald (Germany)

    2009-06-15

    This contribution gives an overview of the project 'Prototype W7-X control system'. The objective of this prototype project is to demonstrate the applicability of the segment orientated control system at a running fusion experiment including steady-state operation, interaction of all relevant components, real time control, data acquisition and on-line data analysis. Furthermore, the W7-X safety concept will be implemented at WEGA and tested.

  4. Control of the formation of projective synchronisation in lower-dimensional discrete-time systems

    International Nuclear Information System (INIS)

    Chee, C.Y.; Xu Daolin

    2003-01-01

    Projective synchronisation was recently observed in partially linear discrete-time systems. The scaling factor that characterises the behaviour of projective synchronisation is however unpredictable. In order to manipulate the ultimate state of the synchronisation, a control algorithm based on Schur-Chon stability criteria is proposed to direct the scaling factor onto any predestined value. In the numerical experiment, we illustrate the application on two chaotic discrete-time systems

  5. EBFA project

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    An engineering project office was established during the fall of 1976 to manage and coordinate all of the activities of the Electron Beam Fusion Project. The goal of the project is to develop the Electron Beam Fusion Accelerator (EBFA) and its supporting systems, and integrate these systems into the new Electron Beam Fusion Facility (EBFF). Supporting systems for EBFA include a control/monitor system, a data acquistion/automatic data processing system, the liquid transfer systems, the insulating gas transfer systems, etc. Engineers and technicians were assigned to the project office to carry out the engineering design, initiate procurement, monitor the fabrication, perform the assembly and to assist the pulsed power research group in the activation of the EBFA

  6. An Empirical Examination of Factors Affecting Group Effectiveness in Information Systems Projects

    Science.gov (United States)

    Hasan, Bassam; Ali, Jafar

    2007-01-01

    Although group project concepts and skills have become a major component in most information systems (IS) academic programs, very little research has attempted to examine factors that may improve or undermine effectiveness of IS group projects. Accordingly, based on relevant literatures, this study develops and empirically tests a model of factors…

  7. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  8. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  9. Coordinate systems and map projections

    CERN Document Server

    Maling, DH

    1992-01-01

    A revised and expanded new edition of the definitive English work on map projections. The revisions take into account the huge advances in geometrical geodesy which have occurred since the early years of satellite geodesy. The detailed configuration of the geoid resulting from the GEOS and SEASAT altimetry measurements are now taken into consideration. Additionally, the chapter on computation of map projections is updated bearing in mind the availability of pocket calculators and microcomputers. Analytical derivation of some map projections including examples of pseudocylindrical and polyconic

  10. Progress report of the CEC project Rodos system development. Period: 1 september 92-31 august 93

    International Nuclear Information System (INIS)

    Marchand, O.

    1994-01-01

    Within the context of the Radioprotection program of the CEC, the RODOS project (Real-time On-line DecisiOn Support system) aims at the development of a decision support system for nuclear emergencies. RODOS involves 22 research teams, divided in 4 sub-projects: 'Meteorology and Atmospheric Dispersion, 'System Development', 'Decision Aiding Techniques'. The fourth sub-project is a Joint Study Project of the Agreement between CEC ad the CIS republics. EDF is working in the 'System Development' sub-project and namely in the 'training' group. This group aims at the creation of a specific training course for health physics managers, based on RODOS. This note reproduces the progress report of the 'Development System' project. The reporting period is: September 92 - August 93. Progress bas been made within the reporting period in the: - development of data assimilation methods incorporating both monitoring data and model predictions for obtaining consistent pictures of the environmental contamination and the source term ; - improvement and extension of the modules ATSTEP-CORA (atmospheric dispersion and deposition), EMERSIM (simulation of emergency actions), ECOAMOR (exposure pathways and dose calculation) and FRODO (simulation of relocation and agricultural countermeasures) ; - preparation of training courses using RODOS as illustrative tool ; - extension of the functions of the RODOS operating system OSY, in particular of RoGIS, its geographical information system. (author). 2 figs

  11. Wind turbines and transmission systems for offshore wind projects in planning stage

    Energy Technology Data Exchange (ETDEWEB)

    Madariaga, Ander; Martin, Jose Luis; Martinez de Alegria, Inigo; Zamora, Inmaculada [University of the Basque Country (UPV/EHU), Bilbao (Spain). Engineering Faculty; Ceballos, Salvador [Parque Tecnologico de Bizkaia, Derio (Spain). Tecnalia Research and Innovation

    2012-07-01

    This paper reviews the current situation of the offshore wind turbines (OWTs) and the transmission systems (TSs) for offshore wind projects in the planning stage. Bearing in mind that offshore wind projects can last between seven and ten years from the first environmental studies to the commissioning, research engineers from companies and academia consider the solutions already available, but also to the new proposals expected to be ready in time for the project under consideration. Regarding the wind energy conversion systems (WECSs) installed in the OWTs, their main characteristics are reviewed considering turbines in the 4.1 to 10.0 MW range. Regarding the TSs, the current situation of point-to-point HVAC and HVDC links is presented, as well as some ideas related to future DC grids currently under study. (orig.)

  12. Projective-Dual Method for Solving Systems of Linear Equations with Nonnegative Variables

    Science.gov (United States)

    Ganin, B. V.; Golikov, A. I.; Evtushenko, Yu. G.

    2018-02-01

    In order to solve an underdetermined system of linear equations with nonnegative variables, the projection of a given point onto its solutions set is sought. The dual of this problem—the problem of unconstrained maximization of a piecewise-quadratic function—is solved by Newton's method. The problem of unconstrained optimization dual of the regularized problem of finding the projection onto the solution set of the system is considered. A connection of duality theory and Newton's method with some known algorithms of projecting onto a standard simplex is shown. On the example of taking into account the specifics of the constraints of the transport linear programming problem, the possibility to increase the efficiency of calculating the generalized Hessian matrix is demonstrated. Some examples of numerical calculations using MATLAB are presented.

  13. FY 1978 Annual report on Sunshine Project results. Survey and research on systems utilizing solar energy (Photovoltaic power generation systems); 1978 nendo taiyo energy riyo system chosa kenkyu seika hokokusho. Taiyoko hatsuden system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1979-03-01

    This survey report provides the basic data for planning national projects to smoothly raise the large industry of solar cell industry in the future by studying how to promote the research and development projects for this area, continuously pursued from the establishment of the Sunshine Project. This report clarifies, first of all, the concept of long-term schedules for research and development of solar thermal power generation systems, based on which technical themes are concretely surveyed, and their economic viability and ripple effects on the other industries are analyzed. The industry of solar thermal power generation systems is a new industry, even based on the global horizons, backed up by the Japan's high-technological areas of electronics and semiconductor industries. It is one of important projects to be urgently developed, also viewed from the above standpoint. This report describes the long-term visions of solar thermal power generation systems, and the research and development projects therefor; stock materials for solar cells and problems involved therein; research and development projects for low-cost solar cells; photovoltaic power generation systems, and the research and development projects therefor; conceptual designs of photovoltaic power generation systems; and standard analytical procedures for solar cells, and technical problems involved therein. (NEDO)

  14. FY 1978 Annual report on Sunshine Project results. Survey and research on systems utilizing solar energy (Photovoltaic power generation systems); 1978 nendo taiyo energy riyo system chosa kenkyu seika hokokusho. Taiyoko hatsuden system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1979-03-01

    This survey report provides the basic data for planning national projects to smoothly raise the large industry of solar cell industry in the future by studying how to promote the research and development projects for this area, continuously pursued from the establishment of the Sunshine Project. This report clarifies, first of all, the concept of long-term schedules for research and development of solar thermal power generation systems, based on which technical themes are concretely surveyed, and their economic viability and ripple effects on the other industries are analyzed. The industry of solar thermal power generation systems is a new industry, even based on the global horizons, backed up by the Japan's high-technological areas of electronics and semiconductor industries. It is one of important projects to be urgently developed, also viewed from the above standpoint. This report describes the long-term visions of solar thermal power generation systems, and the research and development projects therefor; stock materials for solar cells and problems involved therein; research and development projects for low-cost solar cells; photovoltaic power generation systems, and the research and development projects therefor; conceptual designs of photovoltaic power generation systems; and standard analytical procedures for solar cells, and technical problems involved therein. (NEDO)

  15. Preliminary project of s Thomson scattering system for the ETE tokamak

    International Nuclear Information System (INIS)

    Berni, Luiz Angelo

    1997-01-01

    This report presents the preliminary project of the injection and laser light block system for the Thomson (ET) scattering diagnostic to be implanted at the ETE spheric tokamak of the Instituto Nacional de Pesquisas Espaciais (INPE/LAP). Also, a scanning system for the optics of scattered light

  16. Lessons learned from development and quality assurance of software systems at the Halden Project

    International Nuclear Information System (INIS)

    Bjorlo, T.J.; Berg, O.; Pehrsen, M.; Dahll, G.; Sivertsen, T.

    1996-01-01

    The OECD Halden Reactor Project has developed a number of software systems within the research programmes. These programmes have comprised a wide range of topics, like studies of software for safety-critical applications, development of different operator support systems, and software systems for building and implementing graphical user interfaces. The systems have ranged from simple prototypes to installations in process plants. In the development of these software systems, Halden has gained much experience in quality assurance of different types of software. This paper summarises the accumulated experience at the Halden Project in quality assurance of software systems. The different software systems being developed at the Halden Project may be grouped into three categories. These are plant-specific software systems (one-of-a-kind deliveries), generic software products, and safety-critical software systems. This classification has been found convenient as the categories have different requirements to the quality assurance process. In addition, the experience from use of software development tools and proprietary software systems at Halden, is addressed. The paper also focuses on the experience gained from the complete software life cycle, starting with the software planning phase and ending with software operation and maintenance

  17. Project 11. Cowpea - Cereals Systems Improvement in the Dry Savannas

    International Nuclear Information System (INIS)

    1998-01-01

    The research agenda of the IITA is subdivided into a portfolio of 16 projects (Annex 1), around which these annual reports are prepared. These projects address different aspects of attaining sustainable increases in productivity of dominant farming systems and utilization practices in the various agroecologies of Sub-Saharan Africa (SSA). Research and training activities carried out in the 16 projects are being implemented together with national program partners in order to increase the well-being of poor people in SSA through higher levels of food production, better income and nutritional status, and reduced drudgery - particularly for women. Additionally IITA serves as the convening centre for the Ecoregional Program for the Humid and Sub Humid Tropics of Sub-Saharan Africa (EPHTA) and the Systemwide Project on Integrated Pest Management (SP-IPM). The institute-wide log frame (Annex 2) shows the expected contribution of each project to the overall institute goal, with the specific project log frame presented in Annex 3. Highlights from all these projects can be found in Annex 4, which thus provides an illustrative overview of IITA's research activities and achievements of the year. Annex 5 shows all the agroecological zones of sub-saharan Africa in which IITA conducts research. The project management arrangement for implementing IITA's research agenda is relatively new, and continues to evolve from a divisional/program structure. In earlier years, detailed research outputs and achievements were reported in divisional reports; this is the third year that implementation of IITA's research agenda is being presented in individual project reports. To satisfy the continuing needs of disciplinary groups in partner and other interested institutions, portions from the individual project reports will be collated into subject matter reports corresponding to current research divisions -Crop improvement, Plant Health Management, and Resource and Crop Management

  18. Systems Engineering Management Plan for Tank Farm Restoration and Safety Operations, Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    The Systems Engineering Management Plan for Project W-314 has been prepared within the guidelines of HNF-SD-WM-SEMP-002, TWRS Systems Engineering Management Plan. The activities within this SEMP have been tailored, in accordance with the TWRS SEMP and DOE Order 430.1, Life Cycle Asset Management, to meet the needs of the project

  19. USL/DBMS NASA/PC R and D project system testing standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Kavi, Srinu; Moreau, Dennis R.; Yan, Lin

    1984-01-01

    A set of system testing standards to be used in the development of all C software within the NASA/PC Research and Development Project is established. Testing will be considered in two phases: the program testing phase and the system testing phase. The objective of these standards is to provide guidelines for the planning and conduct of program and software system testing.

  20. Design and implementation of a financial planning and tracking system for the Nova Project

    International Nuclear Information System (INIS)

    Holcomb, F.

    1982-01-01

    The Nova project is a 185 million dollar DOE funded project to build an experimental facility to demonstrate the thermonuclear ignition of laser fusion targets. This paper describes the design and implementation considerations for the project's computerized performance measurement financial planning and tracking system and critiques its actual operation

  1. Radioactive Waste Management System: Draft Project Decision Schedule. Revision

    International Nuclear Information System (INIS)

    1985-07-01

    The Nuclear Waste Policy Act (NWPA) of 1982 (Pub. L. 97-425) requires that the Secretary of Energy prepare, in cooperation with affected Federal agencies, a Project Decision Schedule that portrays the optimum way to attain the operation of geologic repositories. The Draft Project Decision Schedule portrays the major milestones of the Radioactive Waste Management System. It also depicts the set of activities for which Federal agencies have responsibility and the deadlines for taking the required action that are associated with the activities. The NWPA also requires that Federal agencies having determined that they: (1) cannot comply with a deadline for taking a required action; or (2) fail to comply with a deadline contained in the Project Decision Schedule; submit a comprehensive report to the Secretary of Energy and Congress to explain their failure or expected failure. The Secretary, in turn, is required to submit to Congress a response to the agency's report. 7 figs., 13 tabs

  2. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  3. Use of System Dynamics Modeling in Medical Education and Research Projects.

    Science.gov (United States)

    Bozikov, Jadranka; Relic, Danko; Dezelic, Gjuro

    2018-01-01

    The paper reviews experiences and accomplishments in application of system dynamics modeling in education, training and research projects at the Andrija Stampar School of Public Health, a branch of the Zagreb University School of Medicine, Croatia. A number of simulation models developed over the past 40 years are briefly described with regard to real problems concerned, objectives and modeling methods and techniques used. Many of them have been developed as the individual students' projects as a part of their graduation, MSc or PhD theses and subsequently published in journals or conference proceedings. Some of them were later used in teaching and simulation training. System dynamics modeling proved to be not only powerful method for research and decision making but also a useful tool in medical and nursing education enabling better understanding of dynamic systems' behavior.

  4. A project-based system for including farmers in the EU ETS

    DEFF Research Database (Denmark)

    Brandt, Urs Steiner; Svendsen, Gert Tinggaard

    2011-01-01

    as ‘the missing link’ in past climate negotiations. We argue that farmers have relatively low marginal reduction costs and that consequences in terms of the effect on permit price and technology are overall positive in the EU Emission Trading System (ETS). Thus, we propose a project-based system...

  5. Linking project-based production and project management temporary systems in multiple contexts: An introduction to the special edition

    Directory of Open Access Journals (Sweden)

    Leon AG Oerlemans

    2014-02-01

    Full Text Available As organisations in more and more industries look for flexible ways of production in the wake of rapidly changing market environments, project-based organising is becoming an increasingly important mode of organisation (Eisenhardt & Tabrizi, 1995. Whereas project-based organisation was traditionally mainly the domain of industries such as film making (Sorenson & Waguespack, 2006, theatre (Goodman & Goodman, 1976, and construction (Gann & Salter, 2000, a project-based mode of operation has recently pervaded many other sectors in the economy, including software development, advertising, biotechnology, consulting, emergency response, fashion, television and complex products and systems (Grabher, 2004; Hobday, 2000. This increasing prevalence is reflected in an exponentially growing body of research (Bakker, 2010, which has made marked progress in areas such as project-based learning (Prencipe & Tell, 2001, project-based innovation (Eisenhardt & Tabrizi, 1995 and project-based careers (Jones, 1996. As a consequence, research on project organisation has moved from being a narrow specialty domain toward being a broad research paradigm, attending to a broad audience in organisation science and beyond (Sydow et al., 2004. In a fairly recent review paper, Bakker (2010 shows that in the period 1988–2008 scholarly attention, as indicated by publications in books and ISI-indexed journals, grew exponentially (see Figure 1. Comparing the number of publications in the period 1988-1998 with the period 1998–2008, he observed an increase of almost 340%.

  6. Long ecological half-lives in seminatural systems. Annual report 1996. Project plan 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    The EKO-2 project, `Long ecological half-lives in semi-natural systems`, consists of three subprojects; sheep grazing on uncultivated pasture, mushrooms and freshwater fish. The main aim is to identify the contribution from semi-natural systems, by determining ecological half-lives for specific foodstuffs from these areas, and thus determine dose to man. In the three ongoing projects we have produced or used data for 8-10 years after the Chernobyl accident. The time series have been very necessary for predicting ecological half-lives for radiocesium and radiostrontium. Unfortunately, the data for radiostrontium have been very scarce. The recovery of Nordic ecosystems from contamination by {sup 137}Cs originating from the Chernobyl accidents is gradually slowing down, at the same time as areas vary widely in susceptibility and recovery rates. The projects have given us useful understanding of the mechanisms governing the transfer of radionuclides, and more knowledge about typical Nordic ecosystems. The soil - vegetation - sheep - system is being studied in five countries; Iceland, the Faeroe Islands, Denmark, Sweden and Norway. Co-ordinated collection of soil, vegetation and meet samples have been performed every year since 1990. After a slow start in 1994, many results from the project `Transfer of radiocesium via mushrooms to roe deer and man (the forest project)` have been published during 1996. Questionnaires have been implemented in Sweden, Denmark and Finland, in Sweden and Denmark with focus on mushrooms, and a more thorough investigation in Finland on natural products for consumption. The main aim in the project `Ecological half-lives in limnic ecosystems` has been to investigate the processes and mechanisms leading to radiocesium being easily available for uptake in e.g. fish. Systematic collection of data has enabled the construction of a GIS system to show fallout levels of {sup 137}Cs, influence from catchment areas, and prediction of {sup 137}Cs in fish

  7. Long ecological half-lives in seminatural systems. Annual report 1996. Project plan 1997

    International Nuclear Information System (INIS)

    1997-01-01

    The EKO-2 project, 'Long ecological half-lives in semi-natural systems', consists of three subprojects; sheep grazing on uncultivated pasture, mushrooms and freshwater fish. The main aim is to identify the contribution from semi-natural systems, by determining ecological half-lives for specific foodstuffs from these areas, and thus determine dose to man. In the three ongoing projects we have produced or used data for 8-10 years after the Chernobyl accident. The time series have been very necessary for predicting ecological half-lives for radiocesium and radiostrontium. Unfortunately, the data for radiostrontium have been very scarce. The recovery of Nordic ecosystems from contamination by 137 Cs originating from the Chernobyl accidents is gradually slowing down, at the same time as areas vary widely in susceptibility and recovery rates. The projects have given us useful understanding of the mechanisms governing the transfer of radionuclides, and more knowledge about typical Nordic ecosystems. The soil - vegetation - sheep - system is being studied in five countries; Iceland, the Faeroe Islands, Denmark, Sweden and Norway. Co-ordinated collection of soil, vegetation and meet samples have been performed every year since 1990. After a slow start in 1994, many results from the project 'Transfer of radiocesium via mushrooms to roe deer and man (the forest project)' have been published during 1996. Questionnaires have been implemented in Sweden, Denmark and Finland, in Sweden and Denmark with focus on mushrooms, and a more thorough investigation in Finland on natural products for consumption. The main aim in the project 'Ecological half-lives in limnic ecosystems' has been to investigate the processes and mechanisms leading to radiocesium being easily available for uptake in e.g. fish. Systematic collection of data has enabled the construction of a GIS system to show fallout levels of 137 Cs, influence from catchment areas, and prediction of 137 Cs in fish. (EG)

  8. A Dynamic Intelligent Decision Approach to Dependency Modeling of Project Tasks in Complex Engineering System Optimization

    Directory of Open Access Journals (Sweden)

    Tinggui Chen

    2013-01-01

    Full Text Available Complex engineering system optimization usually involves multiple projects or tasks. On the one hand, dependency modeling among projects or tasks highlights structures in systems and their environments which can help to understand the implications of connectivity on different aspects of system performance and also assist in designing, optimizing, and maintaining complex systems. On the other hand, multiple projects or tasks are either happening at the same time or scheduled into a sequence in order to use common resources. In this paper, we propose a dynamic intelligent decision approach to dependency modeling of project tasks in complex engineering system optimization. The approach takes this decision process as a two-stage decision-making problem. In the first stage, a task clustering approach based on modularization is proposed so as to find out a suitable decomposition scheme for a large-scale project. In the second stage, according to the decomposition result, a discrete artificial bee colony (ABC algorithm inspired by the intelligent foraging behavior of honeybees is developed for the resource constrained multiproject scheduling problem. Finally, a certain case from an engineering design of a chemical processing system is utilized to help to understand the proposed approach.

  9. UIS BW environmental information system Baden-Wuerttemberg. R+D project INOVUM. Innovative environmental information systems. Phase I 2014/16

    International Nuclear Information System (INIS)

    Weissenbach, Kurt; Schillinger, Wolfgang; Weidemann, Rainer

    2016-01-01

    The R and D project INOVUM of the Ministry for the Environment, Climate and Energy Baden-Wuerttemberg relies on a wide cooperation with partners from government, science and industry to jointly develop governmental environmental information systems. In the focus of this project phase were, e.g. a revision of the framework concept for the Environmental Information System Baden-Wuerttemberg, service-based applications, the development of environmental portals, mobile applications and map services.

  10. Project ME: A Report on the Learning Wall System.

    Science.gov (United States)

    Heilig, Morton L.

    The learning wall system, which consists primarily of a special wall used instead of a screen for a variety of projection purposes, is described, shown diagrammatically, and pictured. Designed to provide visual perceptual motor training on a level that would fall between gross and fine motor performance for perceptually handicapped children, the…

  11. Advanced Hard Real-Time Operating System, the Maruti Project. Part 2.

    Science.gov (United States)

    1997-01-01

    Real - Time Operating System , The Maruti Project DASG-60-92-C-0055 5b. Program Element # 62301E 6. Author(s...The maruti hard real - time " operating system . A CM SIGOPS, Operating Systems Review. 23:90-106, July 1989. 254 !1 110) C. L. Liu and J. Layland...February 14, 1995 Abstract The Maruti Real - Time Operating System was developed for applications that must meet hard real-time constraints. In order

  12. CLIC project R&D studies: the magnet system for the 3 TEV

    CERN Document Server

    Modena, Michele

    2017-01-01

    This Note presents the R&D activities done and coordinated by TE-MSC Group on the magnetic system for the CLIC (Compact Linear Collider) project. The main aspects investigated are: the magnetic system definition, basic design for all magnets (i.e. a CLIC Magnet Catalogue), powering and cost evaluation, advanced design and prototyping for the most critical magnet variants. The CLIC layout here considered is the one for the highest collision energy of 3 TeV. This layout was the one studied in detail as baseline for the CLIC Conceptual Design Report that was released in 2012. This Note summarize the activities of about 6 years (2010-2016) done with the contribution of CERN staff (part-time), the contribution of some CERN Project Associates sponsored by the CLIC Project and in collaboration with STCF Daresbury Laboratory (UK).

  13. Use of a Knowledge Management System in Waste Management Projects

    International Nuclear Information System (INIS)

    Gruendler, D.; Boetsch, W.U.; Holzhauer, U.; Nies, R.A.

    2006-01-01

    In Germany the knowledge management system 'WasteInfo' about waste management and disposal issues has been developed and implemented. Beneficiaries of 'WasteInfo' are official decision makers having access to a large information pool. The information pool is fed by experts, so called authors This means compiling of information, evaluation and assigning of appropriate properties (metadata) to this information. The knowledge management system 'WasteInfo' has been introduced at the WM04, the operation of 'WasteInfo' at the WM05. The recent contribution describes the additional advantage of the KMS being used as a tool for the dealing with waste management projects. This specific aspect will be demonstrated using a project concerning a comparative analysis of the implementation of repositories in six countries using nuclear power as examples: The information of 'WasteInfo' is assigned to categories and structured according to its origin and type of publication. To use 'WasteInfo' as a tool for the processing the projects, a suitable set of categories has to be developed for each project. Apart from technical and scientific aspects, the selected project deals with repository strategies and policies in various countries, with the roles of applicants and authorities in licensing procedures, with safety philosophy and with socio-economic concerns. This new point of view has to be modelled in the categories. Similar to this, new sources of information such as local and regional dailies or particular web-sites have to be taken into consideration. In this way 'WasteInfo' represents an open document which reflects the current status of the respective repository policy in several countries. Information with particular meaning for the German repository planning is marked and by this may influence the German strategy. (authors)

  14. Review of selected contributions of the conference 'Project control in quality management systems'

    International Nuclear Information System (INIS)

    2008-04-01

    There were 12 contributions presented of the conference focused on the project management in quality management systems. Contributions were focused both on theoretical problems from the project management area and on the applications in practice in management systems implementation in accordance with the standards: STN EN ISO 9001:2000, STN EN ISO 14 001:2005, and OHSAS 18 001:1999. One contribution was focused on the project management in the project of preparation of finishing of the building of the Nuclear Power Plant Mochovce of 3. and 4. block and one contribution was focused on the amendment of the Atomic Act or on the preparation of the new Atomic Act with regard to duty of transposition of the Directive of the Council 2006/117/Euratom on control and supervision of the overseas transportations of radioactive waste and nuclear fuel burnt-up into legislation of the Slovak Republic

  15. Information System Development: Can Traditional Project Management Tools Be Successful in Post-Industrial Organizations?

    DEFF Research Database (Denmark)

    Carugati, Andrea

    2002-01-01

    Literature on project management of information systems development suggests practices based on success stories in industrial organizations. Recent trends towards post-industrial organizational forms and loosely coupled networked organizations raise questions regarding the applicability of these ...... of information systems development projects in post-industrial organizations. The guidelines are both the result of post-rationalization of the team members and of the case analysis....

  16. All-optical animation projection system with rotating fieldstone

    Science.gov (United States)

    Ishii, Yuko; Takayama, Yoshihisa; Kodate, Kashiko

    2007-06-01

    A simple and compact rewritable holographic memory system using a fieldstone of Ulexite is proposed. The role of the fieldstone is to impose random patterns on the reference beam to record plural images with the random-reference multiplexing scheme. The operations for writing and reading holograms are carried out by simply rotating the fieldstone in one direction. One of the features of this approach is found in a way to generate random patterns without computer drawings. The experimental study confirms that our system enables the smooth readout of the stored images one after another so that the series of reproduced images are projected as an animation.

  17. Integrated project-management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.C.; Capuin, G.M.

    1988-01-01

    In the early eighties, and in the French case from 1985, the development of the data-processing industry has made the real integration of project-management information systems feasible, and the data-base administration function has been extended to all facets of the engineering process. The new systems had to take into account the existing ones which were still operating efficiently and the new problems encountered due to the changes in the environment. One of these new problems was equipment and materials management, as the period of plants built in series had vanished, and the industry was obliged to build plants individually. The challenge encountered by the French nuclear industry in terms of the project-management information systems was to adapt efficiently to the new situation, and the purpose of this paper is to describe the most-significant elements of this adaptation. The authors review: (2) the objectives established by the company's general management; (2) the organization put into place to reach these objectives; (3) the main choices made; and (4) the economics. 3 references, 1 figure, 1 table.

  18. Integrated project-management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.C.; Capuin, G.M.

    1988-01-01

    In the early eighties, and in the French case from 1985, the development of the data-processing industry has made the real integration of project-management information systems feasible, and the data-base administration function has been extended to all facets of the engineering process. The new systems had to take into account the existing ones which were still operating efficiently and the new problems encountered due to the changes in the environment. One of these new problems was equipment and materials management, as the period of plants built in series had vanished, and the industry was obliged to build plants individually. The challenge encountered by the French nuclear industry in terms of the project-management information systems was to adapt efficiently to the new situation, and the purpose of this paper is to describe the most-significant elements of this adaptation. The authors review: (2) the objectives established by the company's general management; (2) the organization put into place to reach these objectives; (3) the main choices made; and (4) the economics. 3 references, 1 figure, 1 table

  19. Enforcement management system for decommissioning project in Ningyo-toge Environmental Engineering Center. Results of activities in fiscal year 2014

    International Nuclear Information System (INIS)

    Ema, Akira; Miyagawa, Hiroshi; Ishimori, Yuu

    2016-03-01

    The Ningyo-toge Environmental Engineering Center of the Japan Atomic Energy Agency had managed the decommissioning project based on the Quality Management System and the Environmental Management System, but found that these systems were unsuitable for project management from several viewpoints. In order to solve these problems, the Task Team for Enforcement Backend Project temporarily managed the decommissioning project in 2013. To enforce the project management systematically, the Research and Development Promotion Section was organized newly in the Environmental Research and Development Department in April 2014, and started the project management. On the other hand, to establish the primary and secondary documents related to the new system, until April 2015 the section has been developing the Enforcement Management System (EMS) to separate from the Quality Management System or the Environmental Management System. This report summarizes the state of these activities in the FY 2014. Section 1 presents the introduction. Section 2 explains the procedure of the project management and its achievements. Section 3 discusses how to develop the primary and secondary documents. Section 4 concludes the new management system and further views. (author)

  20. Design and Development of a New Multi-Projection X-Ray System for Chest Imaging

    Science.gov (United States)

    Chawla, Amarpreet S.; Boyce, Sarah; Washington, Lacey; McAdams, H. Page; Samei, Ehsan

    2009-02-01

    Overlapping anatomical structures may confound the detection of abnormal pathology, including lung nodules, in conventional single-projection chest radiography. To minimize this fundamental limiting factor, a dedicated digital multi-projection system for chest imaging was recently developed at the Radiology Department of Duke University. We are reporting the design of the multi-projection imaging system and its initial performance in an ongoing clinical trial. The system is capable of acquiring multiple full-field projections of the same patient along both the horizontal and vertical axes at variable speeds and acquisition frame rates. These images acquired in rapid succession from slightly different angles about the posterior-anterior (PA) orientation can be correlated to minimize the influence of overlying anatomy. The developed system has been tested for repeatability and motion blur artifacts to investigate its robustness for clinical trials. Excellent geometrical consistency was found in the tube motion, with positional errors for clinical settings within 1%. The effect of tube-motion on the image quality measured in terms of impact on the modulation transfer function (MTF) was found to be minimal. The system was deemed clinic-ready and a clinical trial was subsequently launched. The flexibility of image acquisition built into the system provides a unique opportunity to easily modify it for different clinical applications, including tomosynthesis, correlation imaging (CI), and stereoscopic imaging.

  1. Adaptive generalized function projective lag synchronization of different chaotic systems with fully uncertain parameters

    International Nuclear Information System (INIS)

    Wu Xiangjun; Lu Hongtao

    2011-01-01

    Highlights: → Adaptive generalized function projective lag synchronization (AGFPLS) is proposed. → Two uncertain chaos systems are lag synchronized up to a scaling function matrix. → The synchronization speed is sensitively influenced by the control gains. → The AGFPLS scheme is robust against noise perturbation. - Abstract: In this paper, a novel projective synchronization scheme called adaptive generalized function projective lag synchronization (AGFPLS) is proposed. In the AGFPLS method, the states of two different chaotic systems with fully uncertain parameters are asymptotically lag synchronized up to a desired scaling function matrix. By means of the Lyapunov stability theory, an adaptive controller with corresponding parameter update rule is designed for achieving AGFPLS between two diverse chaotic systems and estimating the unknown parameters. This technique is employed to realize AGFPLS between uncertain Lue chaotic system and uncertain Liu chaotic system, and between Chen hyperchaotic system and Lorenz hyperchaotic system with fully uncertain parameters, respectively. Furthermore, AGFPLS between two different uncertain chaotic systems can still be achieved effectively with the existence of noise perturbation. The corresponding numerical simulations are performed to demonstrate the validity and robustness of the presented synchronization method.

  2. Assessment of an implementation project for a voip system: a case in the food industry

    Directory of Open Access Journals (Sweden)

    Tiago José Menezes Gonçalves

    2011-09-01

    Full Text Available In the twenty-first century, all organizations are affected directly or indirectly by the use of information technology and communication (ICT. The preparation of good projects to implement these technologies is relevant for a company to remain competitive compared to its competitors. In this context, this study analyzes the economic viability for the implementation of a communication system based on VoIP (Voice on Internet Protocol in a food company of the industrial sector. In this way, we compared the existing telephony system in the company with a proposed project for implementation of a VoIP system. Therefore, we performed the modeling of costs incurred through of equations and we used as indicators of project viability the break-even point analysis, the payback period analysis, the net present value and the internal rate of return. As result, it was concluded that the implementation of VoIP-based systems can result in large cost saving, allowing rapidly recovering of the capital invested in the project. This conclusion was confirmed by the analysis of all the indicators cited above, which allowed to recommend the implementation of the project and verify the applicability of cost models developed.

  3. Project Experiences of the Implementation of the Primary Bleed and Feed System

    International Nuclear Information System (INIS)

    Sanz, S.; Lang, J.; Schmid, J.

    2015-01-01

    Modernization activities play a very important role in the enhancement of the safety and reliability of nuclear power plants. The main focus is on increasing the plant availability, the operational flexibility or the integration of new, additional equipment to satisfy safety requirements, as in this case with the implementation of the design modification primary circuit “Primary Bleed & Feed” (PB&F) of the primary circuit, in the consideration of a beyond design basis accident. Primary B&F prevents the high pressure core melt path and allows an additional alternative heat removal by depressurising the primary system and coolant injection with passive and/or active low pressure systems, when the normal core cooling is not available because of loss of water inventory in the steam generators. The goal of this paper is to show some general good practices gained during the implementation of the Primary Bleed and Feed, System from the project conception to the system implementation. Basically, practice shows that some of the crucial factors which contributed to a successful project execution were based on (i) good interface management between the new system and the existing plant components, (ii) a close coordination of the single engineering disciplines and simultaneous activities, (iii) safety culture and quality assurance were set as priority during the entire project development. (author)

  4. The Isis project: Fault-tolerance in large distributed systems

    Science.gov (United States)

    Birman, Kenneth P.; Marzullo, Keith

    1993-01-01

    This final status report covers activities of the Isis project during the first half of 1992. During the report period, the Isis effort has achieved a major milestone in its effort to redesign and reimplement the Isis system using Mach and Chorus as target operating system environments. In addition, we completed a number of publications that address issues raised in our prior work; some of these have recently appeared in print, while others are now being considered for publication in a variety of journals and conferences.

  5. Overview of NASA's Carbon Monitoring System Flux-Pilot Project

    Science.gov (United States)

    Pawson, Steven; Gunson, Michael R.; Jucks, Kenneth

    2011-01-01

    NASA's space-based observations of physical, chemical and biological parameters in the Earth System along with state-of-the-art modeling capabilities provide unique capabilities for analyses of the carbon cycle. The Carbon Monitoring System is developing an exploratory framework for detecting carbon in the environment and its changes, with a view towards contributing to national and international monitoring activities. The Flux-Pilot Project aims to provide a unified view of land-atmosphere and ocean-atmosphere carbon exchange, using observation-constrained models. Central to the project is the application of NASA's satellite observations (especially MODIS), the ACOS retrievals of the JAXA-GOSAT observations, and the "MERRA" meteorological reanalysis produced with GEOS-S. With a primary objective of estimating uncertainty in computed fluxes, two land- and two ocean-systems are run for 2009-2010 and compared with existing flux estimates. An transport model is used to evaluate simulated CO2 concentrations with in-situ and space-based observations, in order to assess the realism of the fluxes and how uncertainties in fluxes propagate into atmospheric concentrations that can be more readily evaluated. Finally, the atmospheric partial CO2 columns observed from space are inverted to give new estimates of surface fluxes, which are evaluated using the bottom-up estimates and independent datasets. The focus of this presentation will be on the science goals and current achievements of the pilot project, with emphasis on how policy-relevant questions help focus the scientific direction. Examples include the issue of what spatio-temporal resolution of fluxes can be detected from polar-orbiting satellites and whether it is possible to use space-based observations to separate contributions to atmospheric concentrations of (say) fossil-fuel and biological activity

  6. Using Model-Based Systems Engineering To Provide Artifacts for NASA Project Life-Cycle and Technical Reviews

    Science.gov (United States)

    Parrott, Edith L.; Weiland, Karen J.

    2017-01-01

    The ability of systems engineers to use model-based systems engineering (MBSE) to generate self-consistent, up-to-date systems engineering products for project life-cycle and technical reviews is an important aspect for the continued and accelerated acceptance of MBSE. Currently, many review products are generated using labor-intensive, error-prone approaches based on documents, spreadsheets, and chart sets; a promised benefit of MBSE is that users will experience reductions in inconsistencies and errors. This work examines features of SysML that can be used to generate systems engineering products. Model elements, relationships, tables, and diagrams are identified for a large number of the typical systems engineering artifacts. A SysML system model can contain and generate most systems engineering products to a significant extent and this paper provides a guide on how to use MBSE to generate products for project life-cycle and technical reviews. The use of MBSE can reduce the schedule impact usually experienced for review preparation, as in many cases the review products can be auto-generated directly from the system model. These approaches are useful to systems engineers, project managers, review board members, and other key project stakeholders.

  7. High-contrast MacNeille-PBS-based LCOS projection systems

    Science.gov (United States)

    Chen, Jianmin; Robinson, Michael G.; Sharp, Gary D.

    2005-04-01

    Contrast limits are investigated for MacNeille PBS based LCOS projection systems that use retarder stack filters (RSF). The two contributing factors are considered separately; namely the color management system and the panel port. To enhance performance of the former, skew ray compensated RSFs are introduced. For the latter, a general methodology is presented to optimize contrast by compensating the LCOS panel. It is shown that the orientation of the LCOS panel and compensator, relative to the MacNeille PBS, is critical. The significant impact of AR coating performance on system contrast is also revealed. A high contrast architecture will be presented by way of example.

  8. High Pressure Water Jet System Performance Assessment Project A-2A

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    1999-01-01

    Performance assessment for canister cleaning system in the KE Basin. Information obtained from this assessment will be used to design any additional equipment used to clean canisters. After thorough review of the design, maintenance history and operational characteristics of the 105 K East (KE) canister cleaning system, Bartlett recommends that the high pressure water jet system (HPWJS) be modified as outlined in section 5.0, and retained for future use. Further, it is recommended that Spent Nuclear Fuel (SNF) Project consider use of a graded approach for canister cleaning, based on individual canister type and characteristics. This approach would allow a simple method to be used on canisters not needing the more rigorous, high-pressure method. Justification is provided in section 5.0. Although Bartlett has provided some preliminary cost estimates, it is recommended that SNF Project perform a detailed cost-benefit analysis to weigh the alternatives presented

  9. Change management in information systems projects for public organizations

    Directory of Open Access Journals (Sweden)

    Ewa Ziemba

    2015-08-01

    Full Text Available It can be argued that public organizations, in order to provide the public with sufficient services in the current, highly competitive and continuously evolving environment, require changes. The changes that become necessary are often related to the implementation of information systems (IS. Moreover, when organizations are faced with changes, a change management (CM process needs to be put in place. CM theories that are currently available to practitioners and academics are often contradictory; they mostly lack empirical evidence and are supported by unchallenged hypotheses concerning the nature of the contemporary CM. The aim of this paper is, therefore, to identify critical success factors (CFSs for CM in IS projects. In order to reach this aim an explanation of changes in public organizations and the nature of CM are presented. Following this, a framework of CFSs for CM in IS projects are identified based on the literature review. The paper also examines two IS projects and uses them to demonstrate CFSs influencing CM in IS projects in Polish pubic organizations. A discussion of the research findings is provided and the paper concludes with a presentation of the study’s contributions and limitations as well as the stream of future work.

  10. Unigrace - A Project For The Unification of Gravity Systems In Central Europe

    Science.gov (United States)

    Richter, B.; Falk, R.; Erker, E.; Ruess, D.; Mäkinen, J.; Hinderer, J.; Marson, I.; Sledzinski, J.

    Because of the present trends of political and economical unification in Europe for- merly classified gravimetric data in Central Europe are becoming available. The dif- ferences, however, between gravity systems in this area are so large that they strongly affect the geoid, vertical datum definitions and height systems. It is therefore manda- tory to study system differences and to unify them. The project UNIGRACE aims at solving this problem by carrying out absolute grav- ity measurements with the most advanced technology at 17 selected sites in the coun- tries concerned. In a joint effort five European groups from Austria, Finland, France, Germany, Italy and Poland using their absolute gravimeters and partners from Bul- garia, Croatia, Czech Republic, Hungary, Romania, Slovakia and Slovenia cooperate in selecting and/or establishing the sites and performing the measurements as well as in connecting the absolute sites to the national gravimetric networks. As a result, a unique gravity system in Central Europe will be available. The project started on Jan. 1, 1998 and till the end of 2000 all selected gravity sites have been observed twice by absolute gravimeters. From these repeated measurements the final results for this project will be presented which was granted by the European Commission.

  11. Systems engineering aspects to installation of the phased multi-year LANSCE-refurbishment project

    International Nuclear Information System (INIS)

    Pieck, Martin; Erickson, John E.; Gulley, Mark S.; Jones, Kevin W.; Rybarcyk, Larry J.

    2009-01-01

    The LANSCE Refurbishment Project (LANSCE-R) is a phased, multiyear project. The project is scheduled to start refurbishment in the 2nd quarter of fiscal year 2011. Closeout will occur during the 4th quarter of FY2016. During the LANSCE-R project, installation of project components must be scheduled during six annual 6-month maintenance-outages and not conflict with annual LANSCE operational commitments to its user facilities. The project and operations schedules must be synchronized carefully. Therefore, the scheduled maintenance outages, functional testing (with beam off, by primarily project personnel) and commissioning (with beam on, by primarily Accelerator Operation Technology (AOT) personnel) must be managed to accommodate operation. Active and effective coordination and communication between the project and AOT personnel must be encouraged to identify, as early as possible, any operational issues. This paper will report on the systems engineering approach to the integration and control of engineering activities.

  12. Energy Exascale Earth System Model (E3SM) Project Strategy

    Energy Technology Data Exchange (ETDEWEB)

    Bader, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-09-18

    The E3SM project will assert and maintain an international scientific leadership position in the development of Earth system and climate models at the leading edge of scientific knowledge and computational capabilities. With its collaborators, it will demonstrate its leadership by using these models to achieve the goal of designing, executing, and analyzing climate and Earth system simulations that address the most critical scientific questions for the nation and DOE.

  13. Process Intensification in Fuel Cell CHP Systems, the ReforCELL Project

    Directory of Open Access Journals (Sweden)

    José Luis Viviente

    2016-10-01

    Full Text Available This paper reports the findings of a FP7/FCH JU project (ReforCELL that developed materials (catalysts and membranes and an advance autothermal membrane reformer for a micro Combined Heat and Power (CHP system of 5 kWel based on a polymer electrolyte membrane fuel cell (PEMFC. In this project, an active, stable and selective catalyst was developed for the reactions of interest and its production was scaled up to kg scale (TRL5 (TRL: Technology Readiness Level. Simultaneously, new membranes for gas separation were developed. In particular, dense supported thin palladium-based membranes were developed for hydrogen separation from reactive mixtures. These membranes were successfully scaled up to TRL4 and used in lab-scale reactors for fluidized bed steam methane reforming (SMR and autothermal reforming (ATR and in a prototype reactor for ATR. Suitable sealing techniques able to integrate the different membranes in lab-scale and prototype reactors were also developed. The project also addressed the design and optimization of the subcomponents (BoP for the integration of the membrane reformer to the fuel cell system.

  14. The projection operator in a Hilbert space and its directional derivative. Consequences for the theory of projected dynamical systems

    Directory of Open Access Journals (Sweden)

    George Isac

    2004-01-01

    Full Text Available In the first part of this paper we present a representation theorem for the directional derivative of the metric projection operator in an arbitrary Hilbert space. As a consequence of the representation theorem, we present in the second part the development of the theory of projected dynamical systems in infinite dimensional Hilbert space. We show that this development is possible if we use the viable solutions of differential inclusions. We use also pseudomonotone operators.

  15. Integrating System Dynamic and Fuzzy Logic for Economic Assessment of BOT Projects

    Directory of Open Access Journals (Sweden)

    Farnad Nasirzadeh

    2016-03-01

    Full Text Available The selection of the most appropriate project for the investment is one of the most important decisions that should be made by the private investors. This problem is of vital importance in BOT projects, where the total investment as well as the investor's profit should be recovered by the project's income. There are several approaches proposed by the researchers to determine the best economical project in comparison to other projects. The previous researches, however, faced with some major defects. As an example, the effects of various factors affecting the project evaluation process as well as the existing risks and uncertainties are not taken into account. In this research, economic assessment of BOT projects is performed by integrating system dynamic simulation approach and fuzzy logic. For this purpose, first the project's NPV is modeled considering all the influencing factors qualitatively. The relationships that exist between different factors are then determined and the quantitative model is built. Using the developed model, the value of NPV is simulated considering the effects of all the influencing factors and the existing uncertainties. Finally, the value of project's NPV is determined as a triangular fuzzy number. Finally, the best alternative project is selected by comparing the simulated values of NPV. To evaluate the capabilities and performance of the proposed model, the project economical evaluation is performed for two highway projects and the best project is selected.

  16. WE-EF-207-04: An Inter-Projection Sensor Fusion (IPSF) Approach to Estimate Missing Projection Signal in Synchronized Moving Grid (SMOG) System

    International Nuclear Information System (INIS)

    Zhang, H; Kong, V; Jin, J; Ren, L; Zhang, Y; Giles, W

    2015-01-01

    Purpose: A synchronized moving grid (SMOG) has been proposed to reduce scatter and lag artifacts in cone beam computed tomography (CBCT). However, information is missing in each projection because certain areas are blocked by the grid. A previous solution to this issue is acquiring 2 complimentary projections at each position, which increases scanning time. This study reports our first Result using an inter-projection sensor fusion (IPSF) method to estimate missing projection in our prototype SMOG-based CBCT system. Methods: An in-house SMOG assembling with a 1:1 grid of 3 mm gap has been installed in a CBCT benchtop. The grid moves back and forth in a 3-mm amplitude and up-to 20-Hz frequency. A control program in LabView synchronizes the grid motion with the platform rotation and x-ray firing so that the grid patterns for any two neighboring projections are complimentary. A Catphan was scanned with 360 projections. After scatter correction, the IPSF algorithm was applied to estimate missing signal for each projection using the information from the 2 neighboring projections. Feldkamp-Davis-Kress (FDK) algorithm was applied to reconstruct CBCT images. The CBCTs were compared to those reconstructed using normal projections without applying the SMOG system. Results: The SMOG-IPSF method may reduce image dose by half due to the blocked radiation by the grid. The method almost completely removed scatter related artifacts, such as the cupping artifacts. The evaluation of line pair patterns in the CatPhan suggested that the spatial resolution degradation was minimal. Conclusion: The SMOG-IPSF is promising in reducing scatter artifacts and improving image quality while reducing radiation dose

  17. WE-EF-207-04: An Inter-Projection Sensor Fusion (IPSF) Approach to Estimate Missing Projection Signal in Synchronized Moving Grid (SMOG) System

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, H; Kong, V; Jin, J [Georgia Regents University Cancer Center, Augusta, GA (Georgia); Ren, L; Zhang, Y; Giles, W [Duke University Medical Center, Durham, NC (United States)

    2015-06-15

    Purpose: A synchronized moving grid (SMOG) has been proposed to reduce scatter and lag artifacts in cone beam computed tomography (CBCT). However, information is missing in each projection because certain areas are blocked by the grid. A previous solution to this issue is acquiring 2 complimentary projections at each position, which increases scanning time. This study reports our first Result using an inter-projection sensor fusion (IPSF) method to estimate missing projection in our prototype SMOG-based CBCT system. Methods: An in-house SMOG assembling with a 1:1 grid of 3 mm gap has been installed in a CBCT benchtop. The grid moves back and forth in a 3-mm amplitude and up-to 20-Hz frequency. A control program in LabView synchronizes the grid motion with the platform rotation and x-ray firing so that the grid patterns for any two neighboring projections are complimentary. A Catphan was scanned with 360 projections. After scatter correction, the IPSF algorithm was applied to estimate missing signal for each projection using the information from the 2 neighboring projections. Feldkamp-Davis-Kress (FDK) algorithm was applied to reconstruct CBCT images. The CBCTs were compared to those reconstructed using normal projections without applying the SMOG system. Results: The SMOG-IPSF method may reduce image dose by half due to the blocked radiation by the grid. The method almost completely removed scatter related artifacts, such as the cupping artifacts. The evaluation of line pair patterns in the CatPhan suggested that the spatial resolution degradation was minimal. Conclusion: The SMOG-IPSF is promising in reducing scatter artifacts and improving image quality while reducing radiation dose.

  18. Design considerations for a servo optical projection system

    Science.gov (United States)

    Nadalsky, Michael; Allen, Daniel; Bien, Joseph

    1987-01-01

    The present servooptical projection system (SOPS) furnishes 'out-the-window' scenery for a pilot-training flight simulator; attention is given to the parametric tradeoffs made in the SOPS' optical design, as well as to its mechanical packaging and the servonetwork performance of the unit as integrated into a research/training helicopter flight simulator. The final SOPS configuration is a function of scan head design, assembly modularity, image deterioration method, and focal lengths and relative apertures.

  19. Development of a multimode navigation system for an assistive robotics project

    OpenAIRE

    Cherubini , Andrea; Oriolo , G; Macri , F; Aloise , F; Babiloni , F; Cincotti , F; Mattia , D

    2007-01-01

    International audience; Assistive technology is an emerging area where robotic devices can be used to strengthen the residual abilities of individuals with motor disabilities or to help them achieve independence in the activities of daily living. This paper deals with a project aimed at designing a system that provides remote control of home-installed appliances, including the Sony AIBO, a commercial mobile robot. The development of the project is described by focusing on the design of the ro...

  20. Design, Implementation, and Evaluation of the Adolescents and Surveillance System for the Obesity Prevention Project.

    Science.gov (United States)

    Tabacchi, Garden; Bianco, Antonino; Alessi, Nicola; Filippi, Anna Rita; Napoli, Giuseppe; Jemni, Monèm; Censi, Laura; Breda, João; Schumann, Nathali Lehmann; Firenze, Alberto; Vitale, Francesco; Mammina, Caterina

    2016-03-01

    The Adolescents Surveillance System for Obesity prevention (ASSO) Project aimed at developing standardized and web-based tools for collecting data on adolescents' obesity and its potential determinants. This has been implemented and piloted in the local area of Palermo city, Italy. The aim of the present study is to provide an overview of the Project's design, implementation, and evaluation, highlighting all the aspects for a potential scale-up of the surveillance system on the whole national territory and abroad, as a sustainable and effective source of data.The overall structure and management, the ASSO-toolkit, the ASSO-NutFit software, and all developed and used procedures for recruiting, training, and data collecting/analyzing are addressed. An interim evaluation has been performed through a feasibility study; a final Project evaluation has been performed reporting the Strengths, Weaknesses, Opportunities, and Threats (SWOT) and the attributes that a surveillance system should have.This article provides a detailed overview of the Project and highlights that ASSO can be considered a valid, logical, coherent, efficient, and sustainable surveillance system that is consistent with countries' needs and priorities.The system developed by the ASSO Project provides high-quality data and complies with several characteristics typical of a suitable surveillance system. It has a potential of being adopted within the National Health Service and other countries' Health Services for monitoring adolescents' obesity and its determinants, such as food intakes, behaviors, physical activity, and fitness profiles.

  1. The grating projection system: a laser light pattern projection technique for long distance illumination based on the Talbot effect

    International Nuclear Information System (INIS)

    Castagner, J L; Jones, A R

    2003-01-01

    Inspired by the Talbot effect, a grating projection system was designed. Periodic patterns were produced from a projection of a diffraction grating illuminated by a spherical wave of monochromatic coherent light. The diffracted light was collimated by a lens, the focal distance of which was at the centre of the incident spherical wave. Experiments demonstrated that the diffracted orders were also spherical waves centred on the same transverse plane as the incident light. The periodic illumination observed at different locations along the optic axis was proven to be the result of interference between the diffracted orders. It was demonstrated that this system could be used to measure velocities up to 20 m s -1 of particles crossing the fringes at distances up to 3 m

  2. Deaf Effect for Risk Warnings: A Causal Examination applied to Information Systems Projects

    NARCIS (Netherlands)

    A.L.P. Nuijten (Arno)

    2012-01-01

    textabstractEscalation of commitment to a chosen course of action is a phenomenon that shows for example when failing strategic Information Systems (IS) projects are continued for much too long. With this study we contribute to the explanation of why managers (Project Owners) respond with the Deaf

  3. Adaptive function project synchronization of Roessler hyperchaotic system with uncertain parameters

    International Nuclear Information System (INIS)

    Luo Runzi

    2008-01-01

    This Letter addresses the function project synchronization problem of two Roessler hyperchaotic in the presence of unknown system parameters. Based on Lyapunov stability theory an adaptive control law is proposed to make the states of two identical Roessler hyperchaotic systems asymptotically synchronized. Numerical simulations are presented to show the effectiveness of the proposed schemes

  4. An overview of waste management systems at the West Valley demonstration project

    International Nuclear Information System (INIS)

    McIntosh, T.W.; Bixby, W.W.; Krauss, J.E.; Leap, D.R.

    1988-01-01

    In 1980, the United States Congress passed into law the West Valley Demonstration Project Act authorizing the Department of Energy (DOE) to conduct a nuclear waste management project at a former commercial nuclear fuel reprocessing facility located in West Valley, New York. The Project's main objective is to solidify approximately two million litres of high-level radioactive liquid waste into a form suitable for transport to a federal repository for final disposal. The majority of the liquid waste was produced as a by-product of the PUREX extraction process and is stored in an underground steel tank. A waste characterization program has shown that the neutralized waste has settled into two distinct layers: a clear alkaline liquid (supernatant) layer and a dense precipitate (sludge) layer. The principle radioactive elements in the waste are cesium 137 (supernatant) and strontium 90 (sludge). This paper describes the overall project strategy, the waste management systems, the present project engineering and construction status and the project schedule leading to radioactive operation

  5. General methods for modified projective synchronization of hyperchaotic systems with known or unknown parameters

    Science.gov (United States)

    Tang, Yang; Fang, Jian-an

    2008-03-01

    This work is concerned with the general methods for modified projective synchronization of hyperchaotic systems. A systematic method of active control is developed to synchronize two hyperchaotic systems with known parameters. Moreover, by combining the adaptive control and linear feedback methods, general sufficient conditions for the modified projective synchronization of identical or different chaotic systems with fully unknown or partially unknown parameters are presented. Meanwhile, the speed of parameters identification can be regulated by adjusting adaptive gain matrix. Numerical simulations verify the effectiveness of the proposed methods.

  6. Descending projections of the hamster intergeniculate leaflet: relationship to the sleep/arousal and visuomotor systems

    Science.gov (United States)

    Morin, Lawrence P.; Blanchard, Jane H.

    2005-01-01

    The intergeniculate leaflet (IGL), homolog of the primate pregeniculate nucleus, modulates circadian rhythms. However, its extensive anatomical connections suggest that it may regulate other systems, particularly those for visuomotor function and sleep/arousal. Here, descending IGL-efferent pathways are identified with the anterograde tracer, Phaseolus vulgaris leucoagglutinin, with projections to over 50 brain stem nuclei. Projections of the ventral lateral geniculate are similar, but more limited. Many of the nuclei with IGL afferents contribute to circuitry governing visuomotor function. These include the oculomotor, trochlear, anterior pretectal, Edinger-Westphal, and the terminal nuclei; all layers of the superior colliculus, interstitial nucleus of the medial longitudinal fasciculus, supraoculomotor periaqueductal gray, nucleus of the optic tract, the inferior olive, and raphe interpositus. Other target nuclei are known to be involved in the regulation of sleep, including the lateral dorsal and pedunculopontine tegmentum. The dorsal raphe also receives projections from the IGL and may contribute to both sleep/arousal and visuomotor function. However, the locus coeruleus and medial vestibular nucleus, which contribute to sleep and eye movement regulation and which send projections to the IGL, do not receive reciprocal projections from it. The potential involvement of the IGL with the sleep/arousal system is further buttressed by existing evidence showing IGL-efferent projections to the ventrolateral preoptic area, dorsomedial, and medial tuberal hypothalamus. In addition, the great majority of all regions receiving IGL projections also receive input from the orexin/hypocretin system, suggesting that this system contributes not only to the regulation of sleep, but to eye movement control as well.

  7. Manual on SFR R and D and Technology Monitoring System Based on Enterprise Project Management Solution

    International Nuclear Information System (INIS)

    Lee, Dong Uk; Lee, Yong Bum; Won, Byung Chool; Kim, Young In; Hahn, Do Hee

    2008-04-01

    This report is a manual on enterprise project management solution for R and D and technology monitoring system that is applicable for managing the generation IV sodium-cooled fast reactor development. The prime goal of this system is to provide project manager with reliable and accurate information of status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. This report is composed of the three part. The first part is an introduction on microsoft project professional software that was used to monitor the progress, evaluate the results and analyze the resource distribution of the activities. The second makes a description of project plan and control, and the third part describes on collaboration and teamwork

  8. Manual on SFR R and D and Technology Monitoring System Based on Enterprise Project Management Solution

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dong Uk; Lee, Yong Bum; Won, Byung Chool; Kim, Young In; Hahn, Do Hee

    2008-04-15

    This report is a manual on enterprise project management solution for R and D and technology monitoring system that is applicable for managing the generation IV sodium-cooled fast reactor development. The prime goal of this system is to provide project manager with reliable and accurate information of status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. This report is composed of the three part. The first part is an introduction on microsoft project professional software that was used to monitor the progress, evaluate the results and analyze the resource distribution of the activities. The second makes a description of project plan and control, and the third part describes on collaboration and teamwork.

  9. Conceptual design report, 200 Area sanitary sewer system: Project 96L-EWL-116

    International Nuclear Information System (INIS)

    Pursley, D.L.

    1994-01-01

    Project L-116 will install an integrated sanitary sewer system in the 200 Area. This new system will connect existing sewer systems for facilities that have a foreseeable future, provide capacity and routing for future facilities, and install new septic sewer systems for existing facilities that cannot be feasibly connected to the new sewer system and have a mission that will extend beyond the year 2000. Project L-116 will construct a sanitary sewer collection, treatment, and disposal system for facilities in the 200-East and -West Areas and adjacent areas located on the 200 Area plateau. The existing septic systems will be abandoned or decommissioned in accordance with applicable Washington State and local codes and regulations. The conceptual design for the sanitary sewer system is designed around population forecasts of 5,000 people for 200-West Area and 9,000 people for 200-East Area. The definitive design will be based on the latest forecast populations at the time definitive design is initiated

  10. Embedding Systems Thinking into EWB Project Planning and Development: Assessing the Utility of a Group Model Building Approach

    Directory of Open Access Journals (Sweden)

    Kimberly Pugel

    2017-11-01

    Full Text Available Amongst growing sociotechnical efforts, engineering students and professionals both in the international development sector and industry are challenged to approach projects more holistically to achieve project goals.  Engineering service learning organizations must similarly adapt their technological projects to consider varying cultural and economic structures, ensuring more resilient social progress within development efforts.  In practice, systems thinking approaches can be utilized to model the social, economic, political, and technological implications that influence the sustainability of an engineering project. This research assesses the utility of integrating systems thinking into Engineers Without Borders (EWB project planning and development, thereby improving project impact and more effectively engaging members.  At a workshop held at an EWB-USA 2016 Regional Conference, the authors presented a planning and evaluation framework that applies group model building with system dynamics to foster systems thinking through factor diagramming and analysis. To assess the added value of the framework for EWB project planning and development, extensive participant feedback was gathered and evaluated during the workshop and through an optional post-workshop survey.  Supported by thoughtful observations and feedback provided by the EWB members, the model building workshop appeared to help participants reveal and consider project complexities by both visually and quantitatively identifying key non-technical and technical factors that influence project sustainability.  Therefore, system dynamics applied in a group model building workshop offers a powerful supplement to traditional EWB project planning and assessment activities, providing a systems-based tool for EWB teams and partner communities to build capacity and create lasting change.

  11. Exploration Medical System Demonstration (EMSD) Project

    Science.gov (United States)

    Chin, Duane

    2012-01-01

    The Exploration Medical System Demonstration (EMSD) is a project under the Exploration Medical Capability (ExMC) element managed by the Human Research Program (HRP). The vision for the EMSD is to utilize ISS as a test bed to show that several medical technologies needed for an exploration mission and medical informatics tools for managing evidence and decision making can be integrated into a single system and used by the on-orbit crew in an efficient and meaningful manner. Objectives: a) Reduce and even possibly eliminate the time required for on-orbit crew and ground personnel (which include Surgeon, Biomedical Engineer (BME) Flight Controller, and Medical Operations Data Specialist) to access and move medical data from one application to another. b) Demonstrate that the on-orbit crew has the ability to access medical data/information using an intuitive and crew-friendly software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management framework and architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities.

  12. Impact of configuration management system of computer center on support of scientific projects throughout their lifecycle

    International Nuclear Information System (INIS)

    Bogdanov, A.V.; Yuzhanin, N.V.; Zolotarev, V.I.; Ezhakova, T.R.

    2017-01-01

    In this article the problem of scientific projects support throughout their lifecycle in the computer center is considered in every aspect of support. Configuration Management system plays a connecting role in processes related to the provision and support of services of a computer center. In view of strong integration of IT infrastructure components with the use of virtualization, control of infrastructure becomes even more critical to the support of research projects, which means higher requirements for the Configuration Management system. For every aspect of research projects support, the influence of the Configuration Management system is reviewed and development of the corresponding elements of the system is described in the present paper.

  13. AN EXCEL-BASED DECISION SUPPORT SYSTEM FOR SCORING AND RANKING PROPOSED R&D PROJECTS

    OpenAIRE

    ANNE DE PIANTE HENRIKSEN; SUSAN W. PALOCSAY

    2008-01-01

    One of the most challenging aspects of technology management is the selection of research and development (R&D) projects from among a group of proposals. This paper introduces an interactive, user-friendly decision support system for evaluating and ranking R&D projects and demonstrates its application on an example R&D program. It employs the scoring methodology developed by Henriksen and Traynor to provide a practical technique that considers both project merit and project cost in the evalua...

  14. Distortionary effects of a production-sharing fiscal system in a sequential modular offshore petroleum project

    Science.gov (United States)

    Neves de Campos, Thiago

    This research examines the distortionary effects of a discovered and undeveloped sequential modular offshore project under five different designs for a production-sharing agreement (PSA). The model differs from previous research by looking at the effect of taxation from the perspective of a host government, where the objective is to maximize government utility over government revenue generated by the project and the non-pecuniary benefits to society. This research uses Modern Asset Pricing (MAP) theory, which is able to provide a good measure of the asset value accruing to various stakeholders in the project combined with the optimal decision rule for the development of the investment opportunity. Monte Carlo simulation was also applied to incorporate into the model the most important sources of risk associated with the project and to account for non-linearity in the cash flows. For a complete evaluation of how the fiscal system affects the project development, an investor's behavioral model was constructed, incorporating three operational decisions: investment timing, capacity size and early abandonment. The model considers four sources of uncertainty that affect the project value and the firm's optimal decision: the long run oil price and short-run deviations from that price, cost escalation and the reservoir recovery rate. The optimizations outcomes show that all fiscal systems evaluated produce distortion over the companies' optimal decisions, and companies adjust their choices to avoid taxation in different ways according to the fiscal system characteristics. Moreover, it is revealed that fiscal systems with tax provisions that try to capture additional project profits based on production profitability measures leads to stronger distortions in the project investment and output profile. It is also shown that a model based on a fixed percentage rate is the system that creates the least distortion. This is because companies will be subjected to the same

  15. Indonesia solar home systems project for rural electrification

    Energy Technology Data Exchange (ETDEWEB)

    Sanghvi, A.P.

    1997-12-01

    This paper presents, from a financing aspect the broad issues involved in a plan to provide solar home systems (SHS) to provide rural electrification in several areas of rural Indonesia. The paper discusses the approaches being used to provide funding, develop awareness of the technology, and assure the success of the project. The plan involves the use of grant money to help with some of the initial costs of such systems, and thereby to encourage local financing on a terms rather than cash basis. There are needs for market development, and development of a business structure in the country to support this type of technology. Provided this plan can succeed, it may serve as a model for further efforts.

  16. New Technologies in the Payment System Industries: The SEPA Project

    OpenAIRE

    Armando Calabrese; Massimo Gastaldi; Irene Iacovelli; Nathan L. Ghiron

    2010-01-01

    Problem statement: The Single Euro Payments Area (SEPA) project plans to establish an integrated market for extending European integration to retail payments; it aims to provide incentives for using payment systems instead of cash for all micro payments, in order to improve both efficiency and competition in the Euro area. In this study we described the SEPA and its effects on competition and innovation in the payment systems. Moreover, we will discuss the main technologic...

  17. Systems Engineering Plan and project record Configuration Management Plan for the Mixed Waste Disposal Initiative

    International Nuclear Information System (INIS)

    Bryan, W.E.; Oakley, L.B.

    1993-04-01

    This document summarizes the systems engineering assessment that was performed for the Mixed Waste Disposal Initiative (MWDI) Project to determine what types of documentation are required for the success of the project. The report also identifies the documents that will make up the MWDI Project Record and describes the Configuration Management Plan describes the responsibilities and process for making changes to project documentation

  18. Demands on project management of comprehensive modernization projects in the electrical systems area. Example of modernization of electrical systems of Kozloduy NPP Unit 5 and 6

    International Nuclear Information System (INIS)

    Stinshoff, Helmut; Weber, Patrick

    2006-01-01

    In nuclear power plants, station supply with electric energy must be guaranteed any time. This applies in particular also during the implementation of complex electrical systems modernization projects. Highest demands on the project management, extensive experience and system knowledge are required. In the frame of the Modernization Program for the nuclear power plant Kozloduy unit 5 and 6 in Bulgaria Framatome ANP has approved its ability to implement a large scope of modernization measures during the refueling outages of the years 2003 to 2005. The Contract of the Modernization Program for the European Consortium Kozloduy (Framatome ANP, Atomenergoexport) was signed in July 1999 and became effective in June 2001. The project will be finished by May 2006, with the approval of the Updated Final Safety Analysis Report. The scope of hardware work has been implemented within 6 plant outages during the years 2002 to 2005. The focus of the Modernization Program is mainly oriented to nuclear safety aspects, with the aim of upgrading of the Units to a high safety level in compliance with international practice. A further section of the project is dedicated to upgrading of operational equipment. Framatome ANP personnel have shown that besides the technical challenges which had to be faced, also the intercultural and language barriers were successfully overcome. The good teamwork between the partners of the Consortium ECK, its Bulgarian subcontractors and with Kozloduy plant personnel has been an important success factor. (authors)

  19. Effects of an incinerator project on a healthcare-waste management system.

    Science.gov (United States)

    Khammaneechan, Patthanasak; Okanurak, Kamolnetr; Sithisarankul, Pornchai; Tantrakarnapa, Kraichat; Norramit, Poonsup

    2011-10-01

    This evaluative research study aimed to assess the effects of the central healthcare incinerator project on waste management in Yala Province. The study data were collected twice: at baseline and during the operational phase. A combination of structured interview and observation were used during data collection. The study covered 127 healthcare facilities: government hospitals, healthcare centres, and private clinics. The results showed 63% of healthcare risk waste (HCRW) handlers attended the HCRW management training. Improvements in each stage of the HCRW management system were observed in all groups of facilities. The total cost of the HCRW management system did not change, however; the costs for hospitals decreased, whereas those for clinics increased significantly. It was concluded that the central healthcare waste incinerator project positively affected HCRW management in the area, although the costs of management might increase for a particular group. However, the benefits of changing to a more appropriately managed HCRW system will outweigh the increased costs.

  20. National Unmanned Aircraft Systems Project Office

    Science.gov (United States)

    Goplen, Susan E.; Sloan, Jeff L.

    2015-01-01

    The U.S. Geological Survey (USGS) National Unmanned Aircraft Systems (UAS) Project Office leads the implementation of UAS technology in the Department of the Interior (DOI). Our mission is to support the transition of UAS into DOI as a new cost-effective tool for collecting remote-sensing data to monitor environmental conditions, respond to natural hazards, recognize the consequences and benefits of land and climate change and conduct wildlife inventories. The USGS is teaming with all DOI agencies and academia as well as local, State, and Tribal governments with guidance from the Federal Aviation Administration and the DOI Office of Aviation Services (OAS) to lead the safe, efficient, costeffective and leading-edge adoption of UAS technology into the scientific research and operational activities of the DOI.

  1. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  2. Collaborative Learning in Advanced Supply Systems: The KLASS Pilot Project.

    Science.gov (United States)

    Rhodes, Ed; Carter, Ruth

    2003-01-01

    The Knowledge and Learning in Advanced Supply Systems (KLASS) project developed collaborative learning networks of suppliers in the British automotive and aerospace industries. Methods included face-to-face and distance learning, work toward National Vocational Qualifications, and diagnostic workshops for senior managers on improving quality,…

  3. On adaptive modified projective synchronization of a supply chain management system

    Science.gov (United States)

    Tirandaz, Hamed

    2017-12-01

    In this paper, the synchronization problem of a chaotic supply chain management system is studied. A novel adaptive modified projective synchronization method is introduced to control the behaviour of the leader supply chain system by a follower chaotic system and to adjust the leader system parameters until the measurable errors of the system parameters converge to zero. The stability evaluation and convergence analysis are carried out by the Lyapanov stability theorem. The proposed synchronization and antisynchronization techniques are studied for identical supply chain chaotic systems. Finally, some numerical simulations are presented to verify the effectiveness of the theoretical discussions.

  4. An expert system to manage dispute resolutions in construction projects in Egypt

    Directory of Open Access Journals (Sweden)

    A.A. Elziny

    2016-03-01

    Full Text Available This study attempts to shed a great deal of light on the problem of construction disputes in the Egyptian projects. This paper presents a comprehensive review of the available literature on analysis of disputes. The objective of this paper was to provide an expert system can evaluate the overall dispute settlement procedures at company’s projects. A questionnaire has been used to study dispute sources and resolution methods. Four case study applications have been provided to check the validity of the proposed system. Results confirmed that the most important source of disputes was contract management 74.04%, the second was contract documents 71.49%, the third was financial issues 67.80%, the fourth was project related issues 63.92%, and the lowest one was other sources (such as force majeure 61.58%. Finally, the expert program facilitates dispute resolution by using alternative dispute resolution methods instead of going direct to arbitration or litigation.

  5. Baseline comparison report for Project W-058, Replacement of the cross-site transfer system. Revision 1

    International Nuclear Information System (INIS)

    Mendoza, D.P.

    1995-01-01

    This BCR compares the Project W-058 Functional Design Criteria with the Project W-058 Preliminary Design Requirements Document, and identifies the differences between the two documents in the mission definition, project requirements, system functions, and interfaces. Impacts these differences have on current project design are also discussed

  6. Framework to Define Structure and Boundaries of Complex Health Intervention Systems: The ALERT Project

    DEFF Research Database (Denmark)

    Boriani, Elena; Esposito, Roberto; Frazzoli, Chiara

    2017-01-01

    of a framework with focus on systems and system boundaries of interdisciplinary projects. As an example on how to apply our framework, we analyzed ALERT [an integrated sensors and biosensors’ system (BEST) aimed at monitoring the quality, health, and traceability of the chain of the bovine milk......], a multidisciplinary and interdisciplinary project based on the application of measurable biomarkers at strategic points of the milk chain for improved food security (including safety), human, and ecosystem health (1). In fact, the European food safety framework calls for science-based support to the primary producers......’ mandate for legal, scientific, and ethical responsibility in food supply. Because of its multidisciplinary and interdisciplinary approach involving human, animal, and ecosystem health, ALERT can be considered as a One Health project. Within the ALERT context, we identified the need to take into account...

  7. Investments in information systems and technology in the healthcare: Project management mediation

    Directory of Open Access Journals (Sweden)

    Jorge Gomes

    2017-03-01

    Full Text Available Healthcare organisations must improve their business practices and internal procedures in order to answer the increasing demand of health professionals and the general public for more and better information. Hospitals invest massively in information systems and technology (IS/IT in the hope that these investments will improve healthcare and meet patients’ demands. The main objective of our research is to study how organisational maturity, enhanced by investments in IS/IT, project management and best practices, leads to successful projects in public healthcare organisations. The rational of our model is that organisational maturity has a positive effect on IS/IT project success, and that this success is also positively enhanced by the use of project management practices. We emphasise that this combination of approaches can increase the effectiveness of projects. Furthermore, it can also improve the confidence that the results of investments will meet stakeholders’ expectations.

  8. Data Overload Impact on Project Management: How Knowledge Management Systems Can Improve Federal Agencies Effectiveness

    Science.gov (United States)

    Rodriguez, Jacinto

    2013-01-01

    This mixed method exploratory case study was used to explore the effect data overload has on project management, how data overload affects project management effectiveness, how prepared program office staff is to manage multiple projects effectively, and how the program office's organizational structure and data management systems affect project…

  9. Using Group Drawings Activities to Facilitate the Understanding of Systemic Aspects of Projects

    DEFF Research Database (Denmark)

    Arantes do Amaral, João Alberto; Hess, Aurélio; Gonçalves, Paulo

    2017-01-01

    In this article, we present our findings regarding promoting group drawing activities in order to facilitate the learning of systemic aspects of projects. We discuss the approach we used to engage the students and foster learning in our classes. We used group drawing activities in two project...... technique, we followed the five-phased qualitative analysis method, combined with a systems analysis of the data obtained from observation. Five recurrent themes emerged: 1) Making drawings in groups helps content retention and facilitates connections between the concepts explained by the professor; 2...

  10. Applying systems engineering in the civil engineering industry : an analysis of systems engineering projects of a Dutch water board

    NARCIS (Netherlands)

    de Graaf, R. S. (Robin); Vromen, R. M.(Rick); Boes, J. (Hans)

    2017-01-01

    The past decade, practice and literature have shown an increasing interest in Systems Engineering (SE) in the civil engineering industry. The aim of this study is to analyse to what extent SE is applied in six civil engineering SE projects of a Dutch water board. The projects were analysed using a

  11. Impact of configuration management system of computer center on support of scientific projects throughout their lifecycle

    Science.gov (United States)

    Bogdanov, A. V.; Iuzhanin, N. V.; Zolotarev, V. I.; Ezhakova, T. R.

    2017-12-01

    In this article the problem of scientific projects support throughout their lifecycle in the computer center is considered in every aspect of support. Configuration Management system plays a connecting role in processes related to the provision and support of services of a computer center. In view of strong integration of IT infrastructure components with the use of virtualization, control of infrastructure becomes even more critical to the support of research projects, which means higher requirements for the Configuration Management system. For every aspect of research projects support, the influence of the Configuration Management system is being reviewed and development of the corresponding elements of the system is being described in the present paper.

  12. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    OpenAIRE

    Hudson, LN; Newbold, T; Contu, S; Hill, SLL; Lysenko, I; De Palma, A; Phillips, HRP; Alhusseini, TI; Bedford, FE; Bennett, DJ; Booth, H; Burton, VJ; Chng, CWT; Choimes, A; Correia, DLP

    2017-01-01

    The PREDICTS project—Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)—has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to develop global and regional statistical models of how local biodiversity responds to these measures. We describe and make free...

  13. Overview of the system alone and system/CFD coupled calculations of the PHENIX Natural Circulation Test within the THINS project

    Energy Technology Data Exchange (ETDEWEB)

    Pialla, David, E-mail: david.pialla@cea.fr [Commissariat à l’Energie Atomique et aux Energies Alternatives (CEA), DEN/DM2S/STMF, 17 rue des martyrs, 38054 Grenoble Cedex 9 (France); Tenchine, Denis [Commissariat à l’Energie Atomique et aux Energies Alternatives (CEA), DEN/DM2S/STMF, 17 rue des martyrs, 38054 Grenoble Cedex 9 (France); Li, Simon [Commissariat à l’Energie Atomique et aux Energies Alternatives (CEA), DEN/DM2S/STMF, 91191 Gif-sur-Yvette Cedex (France); Gauthe, Paul; Vasile, Alfredo [Commissariat à l’Energie Atomique et aux Energies Alternatives (CEA), DEN/DER/SESI, 13108 Saint Paul Lez Durance Cedex (France); Baviere, Roland; Tauveron, Nicolas; Perdu, Fabien [Commissariat à l’Energie Atomique et aux Energies Alternatives (CEA), DEN/DM2S/STMF, 17 rue des martyrs, 38054 Grenoble Cedex 9 (France); Maas, Ludovic; Cocheme, François [Institut de Radioprotection et de Sûreté Nucléaire (IRSN), PSN/SEMIA/BAST, B.P. 17, 92262 Fontenay-aux-Roses Cedex (France); Huber, Klaus; Cheng, Xu [Karlsruhe Institute of Technology (KIT), Institute of Fusion and Reactor Technology (IFRT), Kaiserstraße 12, Building 07.08, 76131 Karlsruhe (Germany)

    2015-08-15

    Highlights: • The PHENIX natural convection test performed during the end of life tests program. • The calculation with system codes and theirs limits. • The calculation with coupling CFD and system code, which allows better prediction. • The tasks of code validation have been done in the frame of the THINS project. - Abstract: The PHENIX sodium cooled fast reactor started operation in 1973 and was shut down in 2009. Before decommissioning, an ultimate test program was designed and performed to provide valuable data for the development of future sodium cooled fast reactors, as the so-called Astrid prototype in France. Among these ultimate tests, a thermal-hydraulic Natural Convection Test (NCT) was set-up in June 2009. Starting from a reduced power state of 120 MWt, the NCT consists of a loss of the heat sink combined with a reactor scram and a primary pumps trip leading to stabilized natural circulation in the primary sodium system. The thermal-hydraulics innovative system project (THINS project), sponsored by the European Community in the frame of the 7th FP has selected this transient for validation of both stand-alone system code simulations and coupled simulations using system and CFD codes. Participants from three organizations (CEA, IRSN and KIT) have addressed this transient using different system codes (CATHARE, DYN2B and ATHLET) and CFD codes (TRIO-U and OPEN FOAM). The present paper depicts the different modeling approaches, methodologies and compares the numerical results with the available experimental data. Finally, the main lessons learned from the work performed within the THINS project on the PHENIX NCT with respect to code development and validation are summarized.

  14. Use of the project management methodology to establish physical protection system at nuclear facility

    International Nuclear Information System (INIS)

    Gramotkin, F.; Kuzmyak, I.; Kravtsov, V.

    2015-01-01

    The paper considers the possibility of using the project management methodology developed by the Project Management Institute (USA) in nuclear security in terms of modernization or development of physical protection system at nuclear facility. It was demonstrated that this methodology allows competent and flexible management of the projects on physical protection, ensuring effective control of their timely implementation in compliance with the planned budget and quality

  15. FORMATION OF THE CONTENT OF THE PROJECT OF ORGANIZATION OF SECURITY SYSTEMS IN HOTEL BUSINESS

    Directory of Open Access Journals (Sweden)

    Антон Іванович РОГОВИЙ

    2015-05-01

    Full Text Available The article identified and analyzed features of the project management in systems of creating security systems for security systems for the enterprise of hotel business. We have identified the main technical means, which should provide maximum protection of people and infrastructure of hotels. In the article revealed the criteria that should guide the manager in the selection of one or other technical means. In summery we highlighted works, which have to be included in the content of the project of organization of complex security system of companies in the hotel business.

  16. Energy research information system projects report, volume 5, number 1

    Science.gov (United States)

    Johnson, J.; Schillinger, L.

    1980-07-01

    The system (ERIS) provides an inventory of the energy related programs and research activities from 1974 to the present in the states of Montana, Nebraska, North Dakota, South Dakota and Wyoming. Areas of research covered include coal, reclamation, water resources, environmental impacts, socioeconomic impacts, energy conversion, mining methodology, petroleum, natural gas, oilshale, renewable energy resources, nuclear energy, energy conservation and land use. Each project description lists title, investigator(s), research institution, sponsor, funding, time frame, location, a descriptive abstract of the research and title reports and/or publications generated by the research. All projects are indexed by location, personal names, organizations and subject keywords.

  17. Investigations of Heat Recovery in Different Refrigeration System Solutions in Supermarkets. Effsys2 project final report

    Energy Technology Data Exchange (ETDEWEB)

    Sawalha, Same; Chen, Yang

    2010-07-01

    Supermarkets are intensive energy consumers with constantly increasing number of installations. About 50 % of the energy consumption in the supermarket is absorbed by the refrigeration system to cover the cooling demands. Simultaneously, heating is needed in the supermarket where the rejected heat from the refrigeration system is usually higher than the needs. It is an interesting possibility to utilize the rejected heat from the refrigeration system to cover the heating needs in supermarkets. The objective of this project is to investigate the heat recovery performance of the new refrigeration system solutions in supermarket applications. The focus is on environmentally friendly systems with natural working fluids, mainly CO{sub 2} trans-critical systems. The project analyzes the temperature levels and capacities of rejected heat from different system solutions and investigates its matching with the heating needs in supermarkets. Using simulation tools this project also aims at defining the system solution/s which has good energy efficiency for simultaneous cooling and heat recovery.

  18. Core Abilities Evaluation Index System Exploration and Empirical Study on Distributed PV-Generation Projects

    Directory of Open Access Journals (Sweden)

    Lin He

    2017-12-01

    Full Text Available In line with the constraints of environmental problems and economic development, large-scale renewable-generation projects have been planned and constructed in recent years. In order to achieve sustainable power development and improve the power supply structure, China’s government has focused on distributed photovoltaic (PV generation projects due to their advantages of clean emission and local consumption. However, their unstable output power still brings a series of problems concerning reliability, investment income, and available substitution proportion to traditional power, and so on. Therefore, it is imperative to understand the competitive development abilities of distributed PV generation projects and measure them effectively. First, through various investigation methods such as literature reviews, feasibility report analysis and expert interviews, the factors that influence the core abilities of distributed PV-generation projects were explored based on the micro-grid structure. Then, with the indexed exploration results, the factors were classified into 6 dimensions, i.e., investment and earning ability, production and operation ability, power-grid coordination ability, energy-conservation and emission-reduction ability, sustainable development ability, and society-serving ability. Meanwhile, an evaluation index system for core abilities of distributed PV-generation project was constructed using all quantitative indicators. Third, for examining the availability of the evaluation index system, combination weighting and techniques for order preference by similarity to an ideal solution (TOPSIS methods were adopted to assess the practical distributed PV-generation projects. The case study results showed that installed capacity, local economy development, and grid-connected power quantity will influence the core abilities of distributed PV-generation project, obviously. The conclusions of the evaluation analysis on core abilities can

  19. Visualizing project management: models and frameworks for mastering complex systems

    National Research Council Canada - National Science Library

    Forsberg, Kevin; Mooz, Hal; Cotterman, Howard

    2005-01-01

    ...- and beyond that on parameters such as return on investment, market acceptance, or sustainability. Anyone who has lived with the space program, or any other hightech industrial product development, can immediately appreciate this acclaimed book. It addresses and "visualizes" the multidimensional interactions of project management and systems engineering i...

  20. A Case Study : Application of the Systems Engineering Modeling in the early phases of a Complex Space System Project

    NARCIS (Netherlands)

    Bone, M.; Cloutier, R.L.; Gill, E.K.A.; Verma, D.

    2009-01-01

    There is increased recognition of the role of systems engineering in reducing the risk (technical, cost, and schedule) on complex space systems development and integration projects. A number of international systems engineering standards have been published in the last five years (ISO 15288, IEEE

  1. High power RF systems for the BNL ERL project

    Energy Technology Data Exchange (ETDEWEB)

    Zaltsman, A.; Lambiase, R.

    2011-03-28

    The Energy Recovery Linac (ERL) project, now under construction at Brookhaven National Laboratory, requires two high power RF systems. The first RF system is for the 703.75 MHz superconducting electron gun. The RF power from this system is used to drive nearly half an Ampere of beam current to 2 MeV. There is no provision to recover any of this energy so the minimum amplifier power is 1 MW. It consists of 1 MW CW klystron, transmitter and power supplies, 1 MW circulator, 1 MW dummy load and a two-way power splitter. The second RF system is for the 703.75 MHz superconducting cavity. The system accelerates the beam to 54.7 MeV and recovers this energy. It will provide up to 50 kW of CW RF power to the cavity. It consists of 50 kW transmitter, circulator, and dummy load. This paper describes the two high power RF systems and presents the test data for both.

  2. Contributions of the PMBok to the Project Management of an ERP System Implementation

    Directory of Open Access Journals (Sweden)

    Rui Manuel da Silva Gomes

    2013-12-01

    Full Text Available The implementation of Enterprise Resource Planning (ERP Systems has become generalized in companies and organizations, as a way to achieve the supply chain integration, to improve productivity and gain competitive advantages. Those implementations, more than simple technology projects, have revealed to be complex and time consuming business projects due to the structural and behaviour changes involved. This article analyzes, through the Project Coordinator’s point of view, two real cases of ERP implementation projects at Ibico Portuguesa, comparing the project management methodology adopted by Ibico with the Project Management Body of Knowledge (PMBoK, coming to the conclusion that the use of the PMBoK norms and best practices by the Project Manager could have been a success factor in those implementations, particularly referring to the elements that have been pointed as the most critical: planning, involvement and commitment of top management as well as stakeholders’ management.DOI:10.5585/gep.v4i2.37

  3. MEMS - Munich Energy Management System. FIA Project: Exchange of research information; MEMS - Muenchner Energiemanagement-System. FIA-Projekt - Forschungs-Informations-Austausch

    Energy Technology Data Exchange (ETDEWEB)

    Funk, H.; Fries, W.

    2001-10-01

    The City of Munich developed the project 'Munich Energy-Management-Systems (MEMS)' with financial support from the Federal Ministry of Economy and Technology. The project is based on a system of building automation using as many standard elements of hardware and software as possible. This will guarantee a high degree of independence from suppliers and subcontractors. The project has led to a reliable working base for the evaluation, measuring and control for ca. 150 municipal buildings. (orig.) [German] Mit dem Projekt 'Muenchner Energie-Management-System (MEMS)' erstellte die Landeshauptstadt Muenchen mit finanzieller Unterstuetzung des Bundesministeriums fuer Wirtschaft und Technologie ein auf der Leitzentrale Haustechnik (LZH) basierendes zentrales Energiemanagementsystem. Die Verwendung moeglichst vieler Standards in Hard- und Software ist dabei ein wesentlicher Gesichtspunkt. Dadurch wurde eine weitgehende Unabhaengigkeit von einem einzelnen Hersteller erreicht. Damit wurde ein Erfassungs-, Auswerte- und Steuerungssystem fuer derzeit rund 150 staedtische Gebaeude geschaffen. (orig.)

  4. FRAGMENTATION ISSUE IN MALAYSIAN INDUSTRIALISED BUILDING SYSTEM (IBS PROJECTS

    Directory of Open Access Journals (Sweden)

    MOHD NASRUN MOHD NAWI

    2014-02-01

    Full Text Available As a developing country, Malaysian is currently driving for implementing a new or modern construction method, the Industrialised Building System (IBS, as an alternative towards enhancing construction performance. Currently, most of the IBS project developments in Malaysia are still conducted by using the traditional construction process approach. This traditional construction process has been widely criticised for its fragmented approach to project delivery and its failure to form effective teams thus created a number of issues such as reworks, time delay, rising costs, lack of communication and coordination, and wastages. This paper through literature review aims to highlight this fragmentation issue and clarify how far it affects the process of IBS implementation. Suggestions on how an integrated approach in design and construction in order to minimise the fragmentation gaps will be concluded.

  5. Hybrid dislocated control and general hybrid projective dislocated synchronization for the modified Lue chaotic system

    International Nuclear Information System (INIS)

    Xu Yuhua; Zhou Wuneng; Fang Jianan

    2009-01-01

    This paper introduces a modified Lue chaotic system, and some basic dynamical properties are studied. Based on these properties, we present hybrid dislocated control method for stabilizing chaos to unstable equilibrium and limit cycle. In addition, based on the Lyapunov stability theorem, general hybrid projective dislocated synchronization (GHPDS) is proposed, which includes complete dislocated synchronization, dislocated anti-synchronization and projective dislocated synchronization as its special item. The drive and response systems discussed in this paper can be strictly different dynamical systems (including different dimensional systems). As examples, the modified Lue chaotic system, Chen chaotic system and hyperchaotic Chen system are discussed. Numerical simulations are given to show the effectiveness of these methods.

  6. Hybrid dislocated control and general hybrid projective dislocated synchronization for the modified Lue chaotic system

    Energy Technology Data Exchange (ETDEWEB)

    Xu Yuhua [College of Information Science and Technology, Donghua University, Shanghai 201620 (China) and Department of Maths, Yunyang Teacher' s College, Hubei 442000 (China)], E-mail: yuhuaxu2004@163.com; Zhou Wuneng [College of Information Science and Technology, Donghua University, Shanghai 201620 (China)], E-mail: wnzhou@163.com; Fang Jianan [College of Information Science and Technology, Donghua University, Shanghai 201620 (China)

    2009-11-15

    This paper introduces a modified Lue chaotic system, and some basic dynamical properties are studied. Based on these properties, we present hybrid dislocated control method for stabilizing chaos to unstable equilibrium and limit cycle. In addition, based on the Lyapunov stability theorem, general hybrid projective dislocated synchronization (GHPDS) is proposed, which includes complete dislocated synchronization, dislocated anti-synchronization and projective dislocated synchronization as its special item. The drive and response systems discussed in this paper can be strictly different dynamical systems (including different dimensional systems). As examples, the modified Lue chaotic system, Chen chaotic system and hyperchaotic Chen system are discussed. Numerical simulations are given to show the effectiveness of these methods.

  7. Economics of Large Helium Cryogenic Systems experience from Recent Projects at CERN

    CERN Document Server

    Claudet, S; Lebrun, P; Tavian, L; Wagner, U

    1999-01-01

    Large projects based on applied superconductivity, such as particle accelerators, tokamaks or SMES, require powerful and complex helium cryogenic systems, the cost of which represents a significant, if not dominant fraction of the total capital and operational expenditure. It is therefore important to establish guidelines and scaling laws for costing such systems, based on synthetic estimators of their size and performance. Although such data has already been published for many years, the experience recently gathered at CERN with the LEP and LHC projects, which have de facto turned the laboratory into a major world cryogenic center, can be exploited to update this information and broaden the range of application of the scaling laws. We report on the economics of 4.5 K and 1.8 K refrigeration, cryogen distribution and storage systems, and indicate paths towards their cost-to-performance optimisation.

  8. Tailoring Enterprise Systems Engineering Policy for Project Scale and Complexity

    Science.gov (United States)

    Cox, Renee I.; Thomas, L. Dale

    2014-01-01

    Space systems are characterized by varying degrees of scale and complexity. Accordingly, cost-effective implementation of systems engineering also varies depending on scale and complexity. Recognizing that systems engineering and integration happen everywhere and at all levels of a given system and that the life cycle is an integrated process necessary to mature a design, the National Aeronautic and Space Administration's (NASA's) Marshall Space Flight Center (MSFC) has developed a suite of customized implementation approaches based on project scale and complexity. While it may be argued that a top-level system engineering process is common to and indeed desirable across an enterprise for all space systems, implementation of that top-level process and the associated products developed as a result differ from system to system. The implementation approaches used for developing a scientific instrument necessarily differ from those used for a space station. .

  9. Generalized dislocated lag function projective synchronization of fractional order chaotic systems with fully uncertain parameters

    International Nuclear Information System (INIS)

    Wang, Cong; Zhang, Hong-li; Fan, Wen-hui

    2017-01-01

    In this paper, we propose a new method to improve the safety of secure communication. This method uses the generalized dislocated lag projective synchronization and function projective synchronization to form a new generalized dislocated lag function projective synchronization. Moreover, this paper takes the examples of fractional order Chen system and Lü system with uncertain parameters as illustration. As the parameters of the two systems are uncertain, the nonlinear controller and parameter update algorithms are designed based on the fractional stability theory and adaptive control method. Moreover, this synchronization form and method of control are applied to secure communication via chaotic masking modulation. Many information signals can be recovered and validated. Finally, simulations are used to show the validity and feasibility of the proposed scheme.

  10. HIFSA: Heavy-Ion Fusion Systems Assessment Project: Volume 2, Technical analyses

    International Nuclear Information System (INIS)

    Dudziak, D.J.

    1987-12-01

    A two-year project was undertaken to assess the commercial potential of heavy-ion fusion (HIF) as an economical electric power production technology. Because the US HIF development program is oriented toward the use of multiple-beam induction linacs, the study was confined to this particular driver technology. The HIF systems assessment (HIFSA) study involved several subsystem design, performance, and cost studies (e.g., the induction linac, final beam transport, beam transport in reactor cavity environments, cavity clearing, target manufacturing, and reactor plant). In addition, overall power plant systems integration, parametric analyses, and tradeoff studies were performed using a systems code developed specifically for the HIFSA project. Systems analysis results show values for cost of electricity (COE) comparable to those from other inertial- and magnetic-confinement fusion plant studies; viz., 50 to 60 mills/kWh (1985 dollars) for 1-GWe plant sizes. Also, significant COE insensitivity to major accelerator, target, and reactor parameters near the minima was demonstrated. Conclusions from the HIFSA study have already led to substantial modifications of the US HIF research and development program. Separate abstracts were prepared for 17 papers in these analyses

  11. The process behind the project 'houses without heating system' in Goeteborg, Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Glad, Wiktoria [Linkoeping Univ. (Sweden). The Tema Inst., Dept. of Technology and Social Change

    2003-07-01

    In the outskirts of Goeteborg, Sweden, twenty terrace houses were constructed throughout 2001. The spectacular thing about these houses is that no traditional heating systems were installed. The commercial's catch phrase is: 'Houses without heating systems'. Following this project from the beginning and through the whole process, including the long planning procedure (between 1997-1999), the professional actors (the initiator, the building proprietor, the contractor and the researchers), come into focus. This is a unique project in Sweden and has not yet had any follow-up developments. The evaluation, mainly including measurements, is being conducted by a research Inst. and will be finalised in 2003. The theoretical approach is as described in socio-technical system and focuses on social and technical components. The point of departure for the study is the social subsystem and the process behind the project which is important in understanding the final outcome. The study focuses on how and why this project was conducted. Initially, one person's ideas, inspired by building projects abroad were crucial. These ideas were then spread to a network constituting of researchers, the building proprietor, the contractor and the builders, and other consultants. The process can be described as a social innovation since a new concept for heating in buildings is introduced by focusing on the planning process and new participating actors.

  12. Photovoltaic module with integrated power conversion and interconnection system - the European project PV-MIPS

    OpenAIRE

    Henze, N.; Engler, A.; Zacharias, P.

    2006-01-01

    Within the 6th framework program funded by the European Commission the project PV-MIPS (Photovoltaic Module with Integrated Power Conversion System) was launched in November 2004. Together with eleven European partners from Germany, Austria, Greece and the Netherlands a solar module with integrated in-verter shall be developed that can feed solar electricity directly into the grid. The challenging objective of the project is to reduce the total costs of a PV system. At the same time lifetime ...

  13. A review of community-based solar home system projects in the Philippines

    Directory of Open Access Journals (Sweden)

    Macabebe Erees Queen B.

    2016-01-01

    Full Text Available Solar Home Systems (SHS are easy to deploy in island and in remote communities where grid connection is costly. However, issues related to maintenance of these systems emerge after they are deployed because of the remoteness and inaccessibility of the communities. This study looked into community-based programs in the Philippines and investigated the following: (1 social preparation, (2 role of the community in the project, and (3 sustainability of the program. In this paper, three communities under two government programs offering SHS are presented. These programs are the Solar Power Technology Support (SPOTS program of the Department of Agrarian Reform (DAR and the Household Electrification Program (HEP of the Department of Energy (DOE. A focused group discussion and key informant interviews were conducted in two communities in Bukidnon province and in a community in Kalinga to obtain information from the project beneficiaries and SHS users on the preparation, implementation and maintenance of the projects. The results revealed that emphasis on the economic value of the technology, proper training of the locals on the technical and management aspects of the project, as well as the establishment of a supply chain for replacement parts are crucial factors for the sustainability of the programs.

  14. The Virtual Factory Teaching System (VFTS): Project Review and Results.

    Science.gov (United States)

    Kazlauskas, E. J.; Boyd, E. F., III; Dessouky, M. M.

    This paper presents a review of the Virtual Factory Teaching (VFTS) project, a Web-based, multimedia collaborative learning network. The system allows students, working alone or in teams, to build factories, forecast demand for products, plan production, establish release rules for new work into the factory, and set scheduling rules for…

  15. Multiscale Support Vector Learning With Projection Operator Wavelet Kernel for Nonlinear Dynamical System Identification.

    Science.gov (United States)

    Lu, Zhao; Sun, Jing; Butts, Kenneth

    2016-02-03

    A giant leap has been made in the past couple of decades with the introduction of kernel-based learning as a mainstay for designing effective nonlinear computational learning algorithms. In view of the geometric interpretation of conditional expectation and the ubiquity of multiscale characteristics in highly complex nonlinear dynamic systems [1]-[3], this paper presents a new orthogonal projection operator wavelet kernel, aiming at developing an efficient computational learning approach for nonlinear dynamical system identification. In the framework of multiresolution analysis, the proposed projection operator wavelet kernel can fulfill the multiscale, multidimensional learning to estimate complex dependencies. The special advantage of the projection operator wavelet kernel developed in this paper lies in the fact that it has a closed-form expression, which greatly facilitates its application in kernel learning. To the best of our knowledge, it is the first closed-form orthogonal projection wavelet kernel reported in the literature. It provides a link between grid-based wavelets and mesh-free kernel-based methods. Simulation studies for identifying the parallel models of two benchmark nonlinear dynamical systems confirm its superiority in model accuracy and sparsity.

  16. Analogue to digital upgrade project-boiler feedwater control system for Bruce Power nuclear units 1 & 2

    International Nuclear Information System (INIS)

    Long, R.

    2012-01-01

    Bruce Power Nuclear Generating Station A, “Bruce A” is in the final stages of its Restart Project. This capital project will see a large scale rehabilitation of Units 1 and 2 resulting in addition of 1500MW of safe, reliable, clean electricity to the Ontario grid. Restart Project Scope 375, Boiler Feedwater Controls Upgrade was sanctioned to replace obsolete analog devices with a modern digital control system. This project replaced the existing Foxboro H Line analog controls which comprised of 81 individual control modules and support instrumentation. The replacement system was a Triconex Triple Modular Redundant PLC which interfaces with two redundant touch screen monitors. The upgraded digital system incorporates the following controls: 1. Boiler Level Control Loops 2. Dearator Level Control Loops 3. Dearator Pressure Control Loops 4. Boiler Feedwater Recirculation Flow Control Loops A number of technical challenges were addressed when installing a new digital system within the existing plant configuration. Interfaces to new, old and refurbished field devices must be understood as well as implications of connecting to the plant’s Digital Control Computers (DCC’s) and newly installed Steam Generators. The overall project involved many stakeholders to address various requirements from conceptual / design stage through procurement, construction, commissioning and return to service. In addition, the project highlighted the unique requirements found in Nuclear Industry with respect to Human Factors and Software Quality Assurance. (author)

  17. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  18. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  19. Spent Nuclear Fuel (SNF) Project Cask and MCO Helium Purge System Design Review Completion Report - Project A.5 and A.6

    International Nuclear Information System (INIS)

    ARD, K.E.

    2000-01-01

    This report documents the results of the design verification performed on the Cask and Multiple Canister Over-pack (MCO) Helium Purge System. The helium purge system is part of the Spent Nuclear Fuel (SNF) Project Cask Loadout System (CLS) at 100K area. The design verification employed the ''Independent Review Method'' in accordance with Administrative Procedure (AP) EN-6-027-01

  20. Disturbance observer-based adaptive sliding mode hybrid projective synchronisation of identical fractional-order financial systems

    Science.gov (United States)

    Khan, Ayub; Tyagi, Arti

    2018-05-01

    In this paper, we have studied the hybrid projective synchronisation for incommensurate, integer and commensurate fractional-order financial systems with unknown disturbance. To tackle the problem of unknown bounded disturbance, fractional-order disturbance observer is designed to approximate the unknown disturbance. Further, we have introduced simple sliding mode surface and designed adaptive sliding mode controllers incorporating with the designed fractional-order disturbance observer to achieve a bounded hybrid projective synchronisation between two identical fractional-order financial model with different initial conditions. It is shown that the slave system with disturbance can be synchronised with the projection of the master system generated through state transformation. Simulation results are presented to ensure the validity and effectiveness of the proposed sliding mode control scheme in the presence of external bounded unknown disturbance. Also, synchronisation error for commensurate, integer and incommensurate fractional-order financial systems is studied in numerical simulation.

  1. Optimal control of quantum systems: a projection approach

    International Nuclear Information System (INIS)

    Cheng, C.-J.; Hwang, C.-C.; Liao, T.-L.; Chou, G.-L.

    2005-01-01

    This paper considers the optimal control of quantum systems. The controlled quantum systems are described by the probability-density-matrix-based Liouville-von Neumann equation. Using projection operators, the states of the quantum system are decomposed into two sub-spaces, namely the 'main state' space and the 'remaining state' space. Since the control energy is limited, a solution for optimizing the external control force is proposed in which the main state is brought to the desired main state at a certain target time, while the population of the remaining state is simultaneously suppressed in order to diminish its effects on the final population of the main state. The optimization problem is formulated by maximizing a general cost functional of states and control force. An efficient algorithm is developed to solve the optimization problem. Finally, using the hydrogen fluoride (HF) molecular population transfer problem as an illustrative example, the effectiveness of the proposed scheme for a quantum system initially in a mixed state or in a pure state is investigated through numerical simulations

  2. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  3. Hybrid compression/absorption type heat utilization system (eco-energy city project)

    Energy Technology Data Exchange (ETDEWEB)

    Karimata, T.; Susami, S.; Ogawa, Y. [Research and Development Dept., EBARA Corp., Kanagawa pref. (Japan)

    1999-07-01

    This research is intended to develop a 'hybrid compression/absorption type heat utilization system' by combining an absorption process with a compression process in one circulation cycle. This system can produce chilling heat for ice thermal storage by utilizing low-temperature waste heat (lower than 100 C) which is impossible to treat with a conventional absorption chiller. It means that this system will be able to solve the problem of a timing mismatch between waste heat and heat demand. The working fluid used in this proposed system should be suitable for producing ice, be safe, and not damage the ozone layer. In this project, new working fluids were searched as substitutes for the existing H{sub 2}O/LiBr or NH{sub 3}/H{sub 2}O. The interim results of this project in 1997, a testing unit using NH{sub 3}/H{sub 2}O was built for demonstration of the system and evaluation of its characteristics, and R134a/E181 was found to be one of the good working fluid for this system. The COP (ratio of energy of ice produced to electric power provided) of this system using R134a/E181 is expected to achieve 5.5 by computer simulation. The testing unit with this working fluid was built recently and prepared for the tests to confirm the result of the simulation. (orig.)

  4. The water reactor safety research project index: a description of the computerized system for its databank

    International Nuclear Information System (INIS)

    Della Loggia, E.; Primavera, R.

    1993-01-01

    The water reactor nuclear safety research project index has been published by the CEC for many years as a compilation of information on research projects relating to LWR nuclear safety. Since 1981, it has been published, alternatively with NEA (OECD), every second year. The number of contributions from research organizations in Community member countries has steadily increased and reached the level of 1 700 pages, in which more than 600 project descriptions have been collected. In 1988, for the first time, the document was produced using a computerized system developed with the assistance of the ISEI (Institute for Systems Engineering and Informatics) of JRC Ispra. The data have been stored in a computer based in Ispra. The system allows searching a preselected set of subjects through the information stored in the computer: it makes the updating of the projects description much easier and makes the retrieval of the data possible. This report presents a short description of the computerized system developed for the databank of the index. The computerized system presented in this report is structured in a quite general way and for that reason can be adapted very easily to every field where a databank needs to be constituted in order to collect extended information on several projects. (authors). 6 figs., 5 tabs., 5 refs

  5. Financial study of an integrated nuclear desalination system in Tunisia: the Tundesal Project

    International Nuclear Information System (INIS)

    Bouzguenda Benzarti, Neila; Albouy, Michel; Nisan, Simon

    2006-01-01

    This paper focuses on a case study of financing an integrated nuclear desalination system at la Skhira site in Tunisia. More specifically, it shows the financial characteristics of the study, known as the TUNDESAL project, the main financing mechanisms that can be used, and the principal actions required to attract the potential investors and lenders. The paper describes: - The specific financial considerations corresponding to the particular characteristics of nuclear desalination projects: high capital costs, high level of risks and uncertainties, relatively long construction lead times and social and environmental concerns; - The main risks involved in nuclear energy projects; - The profitability study of the TUNDESAL project with the application of the Discounted Cash Flow Analysis; - The main financing sources for the project; - The financing schemes that can be used for project implementation and comparison between these schemes in terms of benefits generated, after covering project costs and repayment of lenders and investors; - The main actions to be done for making the project financially attractive in order to gain the confidence of investors and international financial institutions (optimal allocation of project risks and uncertainties, a suitable and flexible energy and water tariffs policy). Analysis has shown that in particular conditions of Tunisia, the most attractive financial scheme could be the 'project financing + leasing'. (authors)

  6. OPPORTUNITIES AND RISKS IN A CONTROL SYSTEM OF INNOVATIVE PROJECTS OF ORGANIZATIONAL DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    A.V. Grebenkin

    2008-06-01

    Full Text Available The definition of the organizational development innovative project and the technique of its estimation is in this article offered. The distinctive special feature of this method is comparison of opportunities and risks by means of essentially new system of the parameters. These parameters allow to receive a complex estimation of a condition of organizational development innovative projects. Approbation of the offered estimated technique has been lead on set of organizational development innovative projects which were realized at the enterprises of a various branch accessory. The hypothesis about necessity of definition of a condition of the project by means of an estimation of opportunities and their comparisons to risks is confirmed.

  7. A Project-Based Laboratory for Learning Embedded System Design with Industry Support

    Science.gov (United States)

    Lee, Chyi-Shyong; Su, Juing-Huei; Lin, Kuo-En; Chang, Jia-Hao; Lin, Gu-Hong

    2010-01-01

    A project-based laboratory for learning embedded system design with support from industry is presented in this paper. The aim of this laboratory is to motivate students to learn the building blocks of embedded systems and practical control algorithms by constructing a line-following robot using the quadratic interpolation technique to predict the…

  8. The indicators of the management system of projects of research, development and technological innovation of the Cuban Nuclear program

    International Nuclear Information System (INIS)

    Rodriguez Cardona, R.; Cobas Aranda, M.

    2012-01-01

    Organizations responsible for managing projects organised in programmes and projects, require as one of their main demands for the implementation of effective project management systems, i.e., in which to achieve the planned activities and expected results to be achieved. Indicators are key for any system management tools for its management. The objective of this work is to show a set of indicators used by the management system (SGP) projects of I+D+i (research, development and technological innovation) of the nuclear sector, which demonstrate that these indicators have correlation and are feasible for the characterization and management of the system. (author)

  9. Monitoring in educational development projects : the development of a monitoring system

    NARCIS (Netherlands)

    Plomp, T.; Huijsman, Hari; Kluyfhout, Eric

    1992-01-01

    Monitoring in education is usually focused on the monitoring of educational systems at different levels. Monitoring of educational projects receives only recently explicit attention. The paper discusses first the concepts of educational monitoring and evaluation. After that, the experience with

  10. USL/DBMS NASA/PC R and D project system design standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Moreau, Dennis R.

    1984-01-01

    A set of system design standards intended to assure the completeness and quality of designs developed for PC research and development projects is established. The standards presented address the areas of problem definition, initial design plan, design specification, and re-evaluation.

  11. Progress report for project modeling Arctic barrier island-lagoon system response to projected Arctic warming

    Science.gov (United States)

    Erikson, Li H.; Gibbs, Ann E.; Richmond, Bruce M.; Storlazzi, Curt; B.M. Jones,

    2012-01-01

    Changes in Arctic coastal ecosystems in response to global warming may be some of the most severe on the planet. A better understanding and analysis of the rates at which these changes are expected to occur over the coming decades is crucial in order to delineate high-priority areas that are likely to be affected by climate changes. In this study we investigate the likelihood of changes to habitat-supporting barrier island – lagoon systems in response to projected changes in atmospheric and oceanographic forcing associated with Arctic warming. To better understand the relative importance of processes responsible for the current and future coastal landscape, key parameters related to increasing arctic temperatures are investigated and used to establish boundary conditions for models that simulate barrier island migration and inundation of deltaic deposits and low-lying tundra. The modeling effort investigates the dominance and relative importance of physical processes shaping the modern Arctic coastline as well as decadal responses due to projected conditions out to the year 2100.

  12. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project.

    Science.gov (United States)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara; Hill, Samantha L L; Lysenko, Igor; De Palma, Adriana; Phillips, Helen R P; Alhusseini, Tamera I; Bedford, Felicity E; Bennett, Dominic J; Booth, Hollie; Burton, Victoria J; Chng, Charlotte W T; Choimes, Argyrios; Correia, David L P; Day, Julie; Echeverría-Londoño, Susy; Emerson, Susan R; Gao, Di; Garon, Morgan; Harrison, Michelle L K; Ingram, Daniel J; Jung, Martin; Kemp, Victoria; Kirkpatrick, Lucinda; Martin, Callum D; Pan, Yuan; Pask-Hale, Gwilym D; Pynegar, Edwin L; Robinson, Alexandra N; Sanchez-Ortiz, Katia; Senior, Rebecca A; Simmons, Benno I; White, Hannah J; Zhang, Hanbin; Aben, Job; Abrahamczyk, Stefan; Adum, Gilbert B; Aguilar-Barquero, Virginia; Aizen, Marcelo A; Albertos, Belén; Alcala, E L; Del Mar Alguacil, Maria; Alignier, Audrey; Ancrenaz, Marc; Andersen, Alan N; Arbeláez-Cortés, Enrique; Armbrecht, Inge; Arroyo-Rodríguez, Víctor; Aumann, Tom; Axmacher, Jan C; Azhar, Badrul; Azpiroz, Adrián B; Baeten, Lander; Bakayoko, Adama; Báldi, András; Banks, John E; Baral, Sharad K; Barlow, Jos; Barratt, Barbara I P; Barrico, Lurdes; Bartolommei, Paola; Barton, Diane M; Basset, Yves; Batáry, Péter; Bates, Adam J; Baur, Bruno; Bayne, Erin M; Beja, Pedro; Benedick, Suzan; Berg, Åke; Bernard, Henry; Berry, Nicholas J; Bhatt, Dinesh; Bicknell, Jake E; Bihn, Jochen H; Blake, Robin J; Bobo, Kadiri S; Bóçon, Roberto; Boekhout, Teun; Böhning-Gaese, Katrin; Bonham, Kevin J; Borges, Paulo A V; Borges, Sérgio H; Boutin, Céline; Bouyer, Jérémy; Bragagnolo, Cibele; Brandt, Jodi S; Brearley, Francis Q; Brito, Isabel; Bros, Vicenç; Brunet, Jörg; Buczkowski, Grzegorz; Buddle, Christopher M; Bugter, Rob; Buscardo, Erika; Buse, Jörn; Cabra-García, Jimmy; Cáceres, Nilton C; Cagle, Nicolette L; Calviño-Cancela, María; Cameron, Sydney A; Cancello, Eliana M; Caparrós, Rut; Cardoso, Pedro; Carpenter, Dan; Carrijo, Tiago F; Carvalho, Anelena L; Cassano, Camila R; Castro, Helena; Castro-Luna, Alejandro A; Rolando, Cerda B; Cerezo, Alexis; Chapman, Kim Alan; Chauvat, Matthieu; Christensen, Morten; Clarke, Francis M; Cleary, Daniel F R; Colombo, Giorgio; Connop, Stuart P; Craig, Michael D; Cruz-López, Leopoldo; Cunningham, Saul A; D'Aniello, Biagio; D'Cruze, Neil; da Silva, Pedro Giovâni; Dallimer, Martin; Danquah, Emmanuel; Darvill, Ben; Dauber, Jens; Davis, Adrian L V; Dawson, Jeff; de Sassi, Claudio; de Thoisy, Benoit; Deheuvels, Olivier; Dejean, Alain; Devineau, Jean-Louis; Diekötter, Tim; Dolia, Jignasu V; Domínguez, Erwin; Dominguez-Haydar, Yamileth; Dorn, Silvia; Draper, Isabel; Dreber, Niels; Dumont, Bertrand; Dures, Simon G; Dynesius, Mats; Edenius, Lars; Eggleton, Paul; Eigenbrod, Felix; Elek, Zoltán; Entling, Martin H; Esler, Karen J; de Lima, Ricardo F; Faruk, Aisyah; Farwig, Nina; Fayle, Tom M; Felicioli, Antonio; Felton, Annika M; Fensham, Roderick J; Fernandez, Ignacio C; Ferreira, Catarina C; Ficetola, Gentile F; Fiera, Cristina; Filgueiras, Bruno K C; Fırıncıoğlu, Hüseyin K; Flaspohler, David; Floren, Andreas; Fonte, Steven J; Fournier, Anne; Fowler, Robert E; Franzén, Markus; Fraser, Lauchlan H; Fredriksson, Gabriella M; Freire, Geraldo B; Frizzo, Tiago L M; Fukuda, Daisuke; Furlani, Dario; Gaigher, René; Ganzhorn, Jörg U; García, Karla P; Garcia-R, Juan C; Garden, Jenni G; Garilleti, Ricardo; Ge, Bao-Ming; Gendreau-Berthiaume, Benoit; Gerard, Philippa J; Gheler-Costa, Carla; Gilbert, Benjamin; Giordani, Paolo; Giordano, Simonetta; Golodets, Carly; Gomes, Laurens G L; Gould, Rachelle K; Goulson, Dave; Gove, Aaron D; Granjon, Laurent; Grass, Ingo; Gray, Claudia L; Grogan, James; Gu, Weibin; Guardiola, Moisès; Gunawardene, Nihara R; Gutierrez, Alvaro G; Gutiérrez-Lamus, Doris L; Haarmeyer, Daniela H; Hanley, Mick E; Hanson, Thor; Hashim, Nor R; Hassan, Shombe N; Hatfield, Richard G; Hawes, Joseph E; Hayward, Matt W; Hébert, Christian; Helden, Alvin J; Henden, John-André; Henschel, Philipp; Hernández, Lionel; Herrera, James P; Herrmann, Farina; Herzog, Felix; Higuera-Diaz, Diego; Hilje, Branko; Höfer, Hubert; Hoffmann, Anke; Horgan, Finbarr G; Hornung, Elisabeth; Horváth, Roland; Hylander, Kristoffer; Isaacs-Cubides, Paola; Ishida, Hiroaki; Ishitani, Masahiro; Jacobs, Carmen T; Jaramillo, Víctor J; Jauker, Birgit; Hernández, F Jiménez; Johnson, McKenzie F; Jolli, Virat; Jonsell, Mats; Juliani, S Nur; Jung, Thomas S; Kapoor, Vena; Kappes, Heike; Kati, Vassiliki; Katovai, Eric; Kellner, Klaus; Kessler, Michael; Kirby, Kathryn R; Kittle, Andrew M; Knight, Mairi E; Knop, Eva; Kohler, Florian; Koivula, Matti; Kolb, Annette; Kone, Mouhamadou; Kőrösi, Ádám; Krauss, Jochen; Kumar, Ajith; Kumar, Raman; Kurz, David J; Kutt, Alex S; Lachat, Thibault; Lantschner, Victoria; Lara, Francisco; Lasky, Jesse R; Latta, Steven C; Laurance, William F; Lavelle, Patrick; Le Féon, Violette; LeBuhn, Gretchen; Légaré, Jean-Philippe; Lehouck, Valérie; Lencinas, María V; Lentini, Pia E; Letcher, Susan G; Li, Qi; Litchwark, Simon A; Littlewood, Nick A; Liu, Yunhui; Lo-Man-Hung, Nancy; López-Quintero, Carlos A; Louhaichi, Mounir; Lövei, Gabor L; Lucas-Borja, Manuel Esteban; Luja, Victor H; Luskin, Matthew S; MacSwiney G, M Cristina; Maeto, Kaoru; Magura, Tibor; Mallari, Neil Aldrin; Malone, Louise A; Malonza, Patrick K; Malumbres-Olarte, Jagoba; Mandujano, Salvador; Måren, Inger E; Marin-Spiotta, Erika; Marsh, Charles J; Marshall, E J P; Martínez, Eliana; Martínez Pastur, Guillermo; Moreno Mateos, David; Mayfield, Margaret M; Mazimpaka, Vicente; McCarthy, Jennifer L; McCarthy, Kyle P; McFrederick, Quinn S; McNamara, Sean; Medina, Nagore G; Medina, Rafael; Mena, Jose L; Mico, Estefania; Mikusinski, Grzegorz; Milder, Jeffrey C; Miller, James R; Miranda-Esquivel, Daniel R; Moir, Melinda L; Morales, Carolina L; Muchane, Mary N; Muchane, Muchai; Mudri-Stojnic, Sonja; Munira, A Nur; Muoñz-Alonso, Antonio; Munyekenye, B F; Naidoo, Robin; Naithani, A; Nakagawa, Michiko; Nakamura, Akihiro; Nakashima, Yoshihiro; Naoe, Shoji; Nates-Parra, Guiomar; Navarrete Gutierrez, Dario A; Navarro-Iriarte, Luis; Ndang'ang'a, Paul K; Neuschulz, Eike L; Ngai, Jacqueline T; Nicolas, Violaine; Nilsson, Sven G; Noreika, Norbertas; Norfolk, Olivia; Noriega, Jorge Ari; Norton, David A; Nöske, Nicole M; Nowakowski, A Justin; Numa, Catherine; O'Dea, Niall; O'Farrell, Patrick J; Oduro, William; Oertli, Sabine; Ofori-Boateng, Caleb; Oke, Christopher Omamoke; Oostra, Vicencio; Osgathorpe, Lynne M; Otavo, Samuel Eduardo; Page, Navendu V; Paritsis, Juan; Parra-H, Alejandro; Parry, Luke; Pe'er, Guy; Pearman, Peter B; Pelegrin, Nicolás; Pélissier, Raphaël; Peres, Carlos A; Peri, Pablo L; Persson, Anna S; Petanidou, Theodora; Peters, Marcell K; Pethiyagoda, Rohan S; Phalan, Ben; Philips, T Keith; Pillsbury, Finn C; Pincheira-Ulbrich, Jimmy; Pineda, Eduardo; Pino, Joan; Pizarro-Araya, Jaime; Plumptre, A J; Poggio, Santiago L; Politi, Natalia; Pons, Pere; Poveda, Katja; Power, Eileen F; Presley, Steven J; Proença, Vânia; Quaranta, Marino; Quintero, Carolina; Rader, Romina; Ramesh, B R; Ramirez-Pinilla, Martha P; Ranganathan, Jai; Rasmussen, Claus; Redpath-Downing, Nicola A; Reid, J Leighton; Reis, Yana T; Rey Benayas, José M; Rey-Velasco, Juan Carlos; Reynolds, Chevonne; Ribeiro, Danilo Bandini; Richards, Miriam H; Richardson, Barbara A; Richardson, Michael J; Ríos, Rodrigo Macip; Robinson, Richard; Robles, Carolina A; Römbke, Jörg; Romero-Duque, Luz Piedad; Rös, Matthias; Rosselli, Loreta; Rossiter, Stephen J; Roth, Dana S; Roulston, T'ai H; Rousseau, Laurent; Rubio, André V; Ruel, Jean-Claude; Sadler, Jonathan P; Sáfián, Szabolcs; Saldaña-Vázquez, Romeo A; Sam, Katerina; Samnegård, Ulrika; Santana, Joana; Santos, Xavier; Savage, Jade; Schellhorn, Nancy A; Schilthuizen, Menno; Schmiedel, Ute; Schmitt, Christine B; Schon, Nicole L; Schüepp, Christof; Schumann, Katharina; Schweiger, Oliver; Scott, Dawn M; Scott, Kenneth A; Sedlock, Jodi L; Seefeldt, Steven S; Shahabuddin, Ghazala; Shannon, Graeme; Sheil, Douglas; Sheldon, Frederick H; Shochat, Eyal; Siebert, Stefan J; Silva, Fernando A B; Simonetti, Javier A; Slade, Eleanor M; Smith, Jo; Smith-Pardo, Allan H; Sodhi, Navjot S; Somarriba, Eduardo J; Sosa, Ramón A; Soto Quiroga, Grimaldo; St-Laurent, Martin-Hugues; Starzomski, Brian M; Stefanescu, Constanti; Steffan-Dewenter, Ingolf; Stouffer, Philip C; Stout, Jane C; Strauch, Ayron M; Struebig, Matthew J; Su, Zhimin; Suarez-Rubio, Marcela; Sugiura, Shinji; Summerville, Keith S; Sung, Yik-Hei; Sutrisno, Hari; Svenning, Jens-Christian; Teder, Tiit; Threlfall, Caragh G; Tiitsaar, Anu; Todd, Jacqui H; Tonietto, Rebecca K; Torre, Ignasi; Tóthmérész, Béla; Tscharntke, Teja; Turner, Edgar C; Tylianakis, Jason M; Uehara-Prado, Marcio; Urbina-Cardona, Nicolas; Vallan, Denis; Vanbergen, Adam J; Vasconcelos, Heraldo L; Vassilev, Kiril; Verboven, Hans A F; Verdasca, Maria João; Verdú, José R; Vergara, Carlos H; Vergara, Pablo M; Verhulst, Jort; Virgilio, Massimiliano; Vu, Lien Van; Waite, Edward M; Walker, Tony R; Wang, Hua-Feng; Wang, Yanping; Watling, James I; Weller, Britta; Wells, Konstans; Westphal, Catrin; Wiafe, Edward D; Williams, Christopher D; Willig, Michael R; Woinarski, John C Z; Wolf, Jan H D; Wolters, Volkmar; Woodcock, Ben A; Wu, Jihua; Wunderle, Joseph M; Yamaura, Yuichi; Yoshikura, Satoko; Yu, Douglas W; Zaitsev, Andrey S; Zeidler, Juliane; Zou, Fasheng; Collen, Ben; Ewers, Rob M; Mace, Georgina M; Purves, Drew W; Scharlemann, Jörn P W; Purvis, Andy

    2017-01-01

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to develop global and regional statistical models of how local biodiversity responds to these measures. We describe and make freely available this 2016 release of the database, containing more than 3.2 million records sampled at over 26,000 locations and representing over 47,000 species. We outline how the database can help in answering a range of questions in ecology and conservation biology. To our knowledge, this is the largest and most geographically and taxonomically representative database of spatial comparisons of biodiversity that has been collated to date; it will be useful to researchers and international efforts wishing to model and understand the global status of biodiversity.

  13. Effectiveness of Quality Management System (QMS) on Construction Projects

    OpenAIRE

    Behnam Neyestani

    2016-01-01

    Quality management system (QMS) provides generic guidance and requirements for establishing an appropriate quality management procedure, in order to lower cost, increase productivity, customer's satisfaction, and market share in the organizations since the last two-decade. In construction industry, it can assist the companies to achieve successfully their objectives, and ensure that all phases of construction project consistently meet client's requirements (need). The main aim of this article...

  14. Computer system requirements specification for 101-SY hydrogen mitigation test project data acquisition and control system (DACS-1)

    International Nuclear Information System (INIS)

    McNeece, S.G.; Truitt, R.W.

    1994-01-01

    The system requirements specification for SY-101 hydrogen mitigation test project (HMTP) data acquisition and control system (DACS-1) documents the system requirements for the DACS-1 project. The purpose of the DACS is to provide data acquisition and control capabilities for the hydrogen mitigation testing of Tank SY-101. Mitigation testing uses a pump immersed in the waste, directed at varying angles and operated at different speeds and time durations. Tank and supporting instrumentation is brought into the DACS to monitor the status of the tank and to provide information on the effectiveness of the mitigation test. Instrumentation is also provided for closed loop control of the pump operation. DACS is also capable for being expanded to control and monitor other mitigation testing. The intended audience for the computer system requirements specification includes the SY-101 hydrogen mitigation test data acquisition and control system designers: analysts, programmers, instrument engineers, operators, maintainers. It is intended for the data users: tank farm operations, mitigation test engineers, the Test Review Group (TRG), data management support staff, data analysis, Hanford data stewards, and external reviewers

  15. Project on Alternative Systems Study - PASS. Final report

    International Nuclear Information System (INIS)

    1992-10-01

    Alternative repository systems for deep disposal of spent fuel and different types of canisters are studied regarding technical aspects in Project on Alternative System Study (PASS). The objective is to present a ranking of repository systems as well as of canister types for each system. The studies and compared systems are: KBS-3, Medium Long Tunnels (MLH), Long tunnels (VLH) and Deep Boreholes (VDH). For KBS-3 and MLH five canister types are compared (copper/steel, copper/lead, copper (HIP), steel/lead and steel), for VLH two types (copper/steel and steel), and for VDH three types (titanium/concrete with non-consolidated fuel assemblies, titanium/concrete with consolidated assemblies and copper (HIP) with non-consolidated assemblies). The comparison is separated into three sub-comparisons (Technology, Long-term performance and safety, and Costs), which eventually are merged into one ranking. With respect to canister alternatives the result is that the copper/steel canister is ranked first for KBS-3, MLH and VLH, while the titanium/concrete canister is ranked first for VDH (non-consolidated as well as consolidated assemblies. With these canister alternatives the merged ranking of repository systems results in placing KBS-3 slightly in front of MLH. VLH comes thereafter and VDH last. (32 refs.)

  16. Improving a health information system for real-time data entries: An action research project using socio-technical systems theory.

    Science.gov (United States)

    Adaba, Godfried Bakiyem; Kebebew, Yohannes

    2018-03-01

    This paper presents the findings of an action research (AR) project to improve a health information system (HIS) at the Operating Theater Department (OTD) of a National Health Service (NHS) hospital in South East England, the UK. Informed by socio-technical systems (STS) theory, AR was used to design an intervention to enhance an existing patient administration system (PAS) to enable data entries in real time while contributing to the literature. The study analyzed qualitative data collected through interviews, participant observations, and document reviews. The study found that the design of the PAS was unsuitable to the work of the three units of the OTD. Based on the diagnoses and STS theory, the project developed and implemented a successful intervention to enhance the legacy system for data entries in real time. The study demonstrates the value of AR from a socio-technical perspective for improving existing systems in healthcare settings. The steps adopted in this study could be applied to improve similar systems. A follow-up study will be essential to assess the sustainability of the improved system.

  17. Architecture and Functionality of the Advanced Life Support On-Line Project Information System

    Science.gov (United States)

    Hogan, John A.; Levri, Julie A.; Morrow, Rich; Cavazzoni, Jim; Rodriguez, Luis F.; Riano, Rebecca; Whitaker, Dawn R.

    2004-01-01

    An ongoing effort is underway at NASA Ames Research Center (ARC) to develop an On-line Project Information System (OPIS) for the Advanced Life Support (ALS) Program. The objective of this three-year project is to develop, test, revise and deploy OPIS to enhance the quality of decision-making metrics and attainment of Program goals through improved knowledge sharing. OPIS will centrally locate detailed project information solicited from investigators on an annual basis and make it readily accessible by the ALS Community via a Web-accessible interface. The data will be stored in an object-oriented relational database (created in MySQL) located on a secure server at NASA ARC. OPE will simultaneously serve several functions, including being an research and technology development (R&TD) status information hub that can potentially serve as the primary annual reporting mechanism for ALS-funded projects. Using OPIS, ALS managers and element leads will be able to carry out informed R&TD investment decisions, and allow analysts to perform accurate systems evaluations. Additionally, the range and specificity of information solicited will serve to educate technology developers of programmatic needs. OPIS will collect comprehensive information from all ALS projects as well as highly detailed information specific to technology development in each ALS area (Waste, Water, Air, Biomass, Food, Thermal, Controls and Systems Analysis). Because the scope of needed information can vary dramatically between areas, element-specific technology information is being compiled with the aid of multiple specialized working groups. This paper presents the current development status in terms of the architecture and functionality of OPIS. Possible implementation approaches for OPIS are also discussed.

  18. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: Terminal Operations HITL 1B Primary Results

    Science.gov (United States)

    Rorie, Conrad; Monk, Kevin; Roberts, Zach; Brandt, Summer

    2018-01-01

    This presentation provides an overview of the primary results from the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project's second Terminal Operations human-in-the-loop simulation. This talk covers the background of this follow-on experiment, which includes an overview of the first Terminal Operations HITL performed by the project. The primary results include a look at the number and durations of detect and avoid (DAA) alerts issued by the two DAA systems under test. It also includes response time metrics and metrics on the ability of the pilot-in-command (PIC) to maintain sufficient separation. Additional interoperability metrics are included to illustrate how pilots interact with the tower controller. Implications and conclusions are covered at the end.

  19. Web-Based Dissemination System for the Trusted Computing Exemplar Project

    Science.gov (United States)

    2005-06-01

    6 3. Fiasco Microkernel ..............................................................................6 4. Apache Web Server...Fiasco Microkernel The next project examined was the Fiasco Microkernel developed by the Dresden University of Technology. This dissemination...System,” 1999, http://www.eros-os.org, Accessed: May 2005. [5] “The Fiasco Microkernel ,” February 2004, http://os.inf.tu-dresden.de/fiasco/, Accessed

  20. The Cc1 ProjectSystem For Private Cloud Computing

    Directory of Open Access Journals (Sweden)

    J Chwastowski

    2012-01-01

    Full Text Available The main features of the Cloud Computing system developed at IFJ PAN are described. The project is financed from the structural resources provided by the European Commission and the Polish Ministry of Science and Higher Education (Innovative Economy, National Cohesion Strategy. The system delivers a solution for carrying out computer calculations on a Private Cloud computing infrastructure. It consists of an intuitive Web based user interface, a module for the users and resources administration and the standard EC2 interface implementation. Thanks to the distributed character of the system it allows for the integration of a geographically distant federation of computer clusters within a uniform user environment.

  1. Effects of recent energy system changes on CO2 projections for the United States.

    Science.gov (United States)

    Lenox, Carol S; Loughlin, Daniel H

    2017-09-21

    Recent projections of future United States carbon dioxide (CO 2 ) emissions are considerably lower than projections made just a decade ago. A myriad of factors have contributed to lower forecasts, including reductions in end-use energy service demands, improvements in energy efficiency, and technological innovations. Policies that have encouraged these changes include renewable portfolio standards, corporate vehicle efficiency standards, smart growth initiatives, revisions to building codes, and air and climate regulations. Understanding the effects of these and other factors can be advantageous as society evaluates opportunities for achieving additional CO 2 reductions. Energy system models provide a means to develop such insights. In this analysis, the MARKet ALlocation (MARKAL) model was applied to estimate the relative effects of various energy system changes that have happened since the year 2005 on CO 2 projections for the year 2025. The results indicate that transformations in the transportation and buildings sectors have played major roles in lowering projections. Particularly influential changes include improved vehicle efficiencies, reductions in projected travel demand, reductions in miscellaneous commercial electricity loads, and higher efficiency lighting. Electric sector changes have also contributed significantly to the lowered forecasts, driven by demand reductions, renewable portfolio standards, and air quality regulations.

  2. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  3. Interface control document for tank waste remediation system privatization phase 1 infrastructure support Project W-519

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This document describes the functional and physical interfaces between the Tank Waste Remediation System (TWRS) Privatization Phase 1 Infrastructure Project W-519 and the various other projects (i.e., Projects W-314, W-464, W-465, and W-520) supporting Phase 1 that will require the allocation of land in and about the Privatization Phase 1 Site and/or interface with the utilities extended by Project W-519. Project W-519 will identify land use allocations and upgrade/extend several utilities in the 200-East Area into the Privatization Phase 1 Site (formerly the Grout Disposal Compound) in preparation for the Privatization Contractors (PC) to construct treatment facilities. The project will upgrade/extend: Roads, Electrical Power, Raw Water (for process and fire suppression), Potable Water, and Liquid Effluent collection. The replacement of an existing Sanitary Sewage treatment system that may be displaced by Phase 1 site preparation activities may also be included

  4. Characterizing opto-electret based paper speakers by using a real-time projection Moiré metrology system

    Science.gov (United States)

    Chang, Ya-Ling; Hsu, Kuan-Yu; Lee, Chih-Kung

    2016-03-01

    Advancement of distributed piezo-electret sensors and actuators facilitates various smart systems development, which include paper speakers, opto-piezo/electret bio-chips, etc. The array-based loudspeaker system possess several advantages over conventional coil speakers, such as light-weightness, flexibility, low power consumption, directivity, etc. With the understanding that the performance of the large-area piezo-electret loudspeakers or even the microfluidic biochip transport behavior could be tailored by changing their dynamic behaviors, a full-field real-time high-resolution non-contact metrology system was developed. In this paper, influence of the resonance modes and the transient vibrations of an arraybased loudspeaker system on the acoustic effect were measured by using a real-time projection moiré metrology system and microphones. To make the paper speaker even more versatile, we combine the photosensitive material TiOPc into the original electret loudspeaker. The vibration of this newly developed opto-electret loudspeaker could be manipulated by illuminating different light-intensity patterns. Trying to facilitate the tailoring process of the opto-electret loudspeaker, projection moiré was adopted to measure its vibration. By recording the projected fringes which are modulated by the contours of the testing sample, the phase unwrapping algorithm can give us a continuous phase distribution which is proportional to the object height variations. With the aid of the projection moiré metrology system, the vibrations associated with each distinctive light pattern could be characterized. Therefore, we expect that the overall acoustic performance could be improved by finding the suitable illuminating patterns. In this manuscript, the system performance of the projection moiré and the optoelectret paper speakers were cross-examined and verified by the experimental results obtained.

  5. The method and index of sustainability assessment of infrastructure projects based on system dynamics in China

    Directory of Open Access Journals (Sweden)

    Jun Zhou

    2015-05-01

    Full Text Available Purpose: As one of the most important overhead capital of urban economics and social development, the sustainable development of urban infrastructure is becoming a key issue of prosperous society growing. The purpose of this paper is to establish a basic model to analysis certain infrastructure project’s sustainable construction and operation. Design/methodology/approach: System dynamics is an effective stimulation method and tool to deal with such complex, dynamics, nonlinear systems, which could be used in analyzing and evaluating all aspects of infrastructure sustainability internally and externally. In this paper, the system is divided into four subsystems and 12 main impact indicators. Through setting the boundary and other basic hypothesis, this paper designs the basic causal loop diagrams and stock & flow diagrams to describe the relationship between variables and establish a quantifiable structure for the system. Findings: Adopting a sewerage treatment in China as a case to test our model, we could conclude that the model of internal sustainable subsystem is reasonable. However, this model is a basic model, and it need to be specific designed for the certain project due to the diversity of infrastructure types and the unique conditions of each projects. Originality/value: System Dynamics (SD is widely used in the study of sustainable development and has plentiful research achievements from macro perspective but few studies in the microcosmic project systems. This paper focuses on the unique characteristics of urban infrastructure in China and selects infrastructure project which is based on micro-system discussion. The model we designed has certain practical significance in policy setting, operation monitoring and adjustment of the urban projects with high rationality and accuracy.

  6. Development as an effective management system construction and investment projects

    Directory of Open Access Journals (Sweden)

    Beloborodov Roman S.

    2011-02-01

    Full Text Available The article presents the material of the application of the conception «Development» as the effective methodology of the investment-construction project management within the framework the systems approach. Theoretical principles of the application of this conception are generalized and systematized based on the example of the creation of the low habitable complex.

  7. The ExaNeSt Project: Interconnects, Storage, and Packaging for Exascale Systems

    OpenAIRE

    Katevenis, M.; Chrysos, N.; Marazakis, M.; Mavroidis, I.; Chaix, F.; Kallimanis, N.; Navaridas, J.; Goodacre, J.; Vicini, P.; Biagioni, A.; Paolucci, P. S.; Lonardo, A.; Pastorelli, E.; Cicero, F. Lo; Ammendola, R.

    2016-01-01

    ExaNest is one of three European projects that support a ground-breaking computing architecture for exascale-class systems built upon power-efficient 64-bit ARM processors. This group of projects share an “everything-close” and “share-anything” paradigm, which trims down the power consumption –by shortening the distance of signals for most data transfers– as well as the cost and footprint area of the installation –by reducing the number of devices needed to meet performance targets. In Exa...

  8. Project mechanisms challenges

    International Nuclear Information System (INIS)

    Perthuis, Ch. de

    2005-06-01

    The project mechanism complete the quotas systems concerning the carbon dioxide emissions market. The author explains and discusses these mechanisms and provides a panorama of the existing and developing projects. More specially she brings information on the mechanism of clean developments and renewable energies, the coordinated mechanisms, the agricultural projects, the financing of the projects and the exchange systeme of the New south Wales. (A.L.B.)

  9. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  10. Evaluating Managerial Styles for System Development Life Cycle Stages to Ensure Software Project Success

    Science.gov (United States)

    Kocherla, Showry

    2012-01-01

    Information technology (IT) projects are considered successful if they are completed on time, within budget, and within scope. Even though, the required tools and methodologies are in place, IT projects continue to fail at a higher rate. Current literature lacks explanation for success within the stages of system development life-cycle (SDLC) such…

  11. MATCHING CONFIGURATIONS PROJECTS OF COOPERATIVE MILK COLLECTION PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Анатолій Миколайович ТРИГУБА

    2017-03-01

    Full Text Available The condition analysis of dairy farming is done and the reasons for its degradation are revealed. The need of technologically integrated production systems projects, harvesting, and processing of milk are substantiated. A scientific methodology and the method of project design of milk provision cooperative coordination in the community of the project environment, which are based on systematic-evaluative approach and simulation are proposed. The criterion for the definition of rational parameters of objects configuration for milk provision cooperative projects in the community system is the maximum value of their product. The monetary functioning assessment of the configuration object of cooperative milk provision projects in the community is done. On the basis of the proposed method, we performed the coordination of project configuration of milk provision cooperative with the project environment of territory Zabolotsi community in Brody district of Lviv region.

  12. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  13. New Project System for Undergraduate Electronic Engineering

    Science.gov (United States)

    Chiu, Dirk M.; Chiu, Shen Y.

    2005-01-01

    A new approach to projects for undergraduate electronic engineering in an Australian university has been applied successfully for over 10 years. This approach has a number of projects running over three year period. Feedback from past graduates and their managers has confirmed that these projects train the students well, giving them the ability…

  14. Design interface management system for nuclear power plant project

    International Nuclear Information System (INIS)

    Wang Jun

    2012-01-01

    Design interfaces exist between different participants and during the whole course of a nuclear power project, and include different disciplinary requirements. The purpose of interface management is to establish a procedure, which can be efficiently used to control the complex design interfaces and ensure its compliance with NPP design requirements. To this end, a complete work procedures and relationship will be defined and classified, so as to set up the structure of interface management system. The system consists of three levels, i.e. working procedure level, management tool level and technical document level. Two management routes, i.e. administration route and technical route, are adopted so as to conduct management efficiently. (author)

  15. Operational test report - Project W-320 cathodic protection systems

    International Nuclear Information System (INIS)

    Bowman, T.J.

    1998-01-01

    Washington Administrative Code (WAC) 173-303-640 specifies that corrosion protection must be designed into tank systems that treat or store dangerous wastes. Project W-320, Waste Retrieval Sluicing System (WRSS), utilizes underground encased waste transfer piping between tanks 241-C-106 and 241-AY-102. Corrosion protection is afforded to the encasements of the WRSS waste transfer piping through the application of earthen ionic currents onto the surface of the piping encasements. Cathodic protection is used in conjunction with the protective coatings that are applied upon the WRSS encasement piping. WRSS installed two new two rectifier systems (46 and 47) and modified one rectifier system (31). WAC 173-303-640 specifies that the proper operation of cathodic protection systems must be confirmed within six months after initial installation. The WRSS cathodic protection systems were energized to begin continuous operation on 5/5/98. Sixteen days after the initial steady-state start-up of the WRSS rectifier systems, the operational testing was accomplished with procedure OTP-320-006 Rev/Mod A-0. This operational test report documents the OTP-320-006 results and documents the results of configuration testing of integrated piping and rectifier systems associated with the W-320 cathodic protection systems

  16. Fuel transfer system ALARA design review - Project A.15

    International Nuclear Information System (INIS)

    KUEBERTH, L.R.

    2001-01-01

    One mission of the Spent Nuclear Fuel (SNF) Project is to move the SNF from the K Basins in the Hanford 100K Area to an interim dry storage at the Canister Storage Building (CSB) in the Hanford 200 East Area. The Fuel Transfer System (FTS) is a subproject that will move the SNF from the 105K East (KE) Facility to the 105K West (KW) Facility. The SNF will be treated for shipment to the Cold Vacuum Drying (CVD) facility at the KW Basin. The SNF canisters will be loaded underwater into a Shielded Transfer Cask (STC) in the KE Basin. The fully loaded STC will be brought out of the water and placed into a Cask Transfer Overpack (CTO) by the STC Straddle Carrier. As the STC is removed from the water, it will be washed down with demineralized water by an manual rinse system. The CTO with the STC inside will be placed on a transport trailer and transferred to the KW Basin as an intra-facility transfer. The CTO will be unloaded from the shipping trailer at the KW Basin and the STC will be removed from the CTO. The STC will then be lowered into the KW Basin water and the fuel will be removed. The SNF will then be processed for shipment to the CVD. As soon as all of the fuel has been removed from the STC, the cask will be removed from the KW Basin water and placed into the CTO. The CTO will again be placed on the trailer for transport back to the KE Basin where the entire cycle will be repeated approximately 400 times. This document records the As Low As Reasonably Achievable (ALARA) findings and design recommendations/requirements by the SNF Project noted during the Final Design Review of the STC, CTO, STC Transfer System, Annexes and Roadways for support of FTS. This document is structured so that all statements that include the word ''shall'' represent design features that have been or will be implemented within the project scope. Statements that include the words ''should'' or ''recommend'' represent ALARA design features to be evaluated for future implementation

  17. Network, system, and status software enhancements for the autonomously managed electrical power system breadboard. Volume 1: Project summary

    Science.gov (United States)

    Mckee, James W.

    1990-01-01

    This volume (1 of 4) gives a summary of the original AMPS software system configuration, points out some of the problem areas in the original software design that this project is to address, and in the appendix collects all the bimonthly status reports. The purpose of AMPS is to provide a self reliant system to control the generation and distribution of power in the space station. The software in the AMPS breadboard can be divided into three levels: the operating environment software, the protocol software, and the station specific software. This project deals only with the operating environment software and the protocol software. The present station specific software will not change except as necessary to conform to new data formats.

  18. REDD+ readiness: early insights on monitoring, reporting and verification systems of project developers

    International Nuclear Information System (INIS)

    Joseph, Shijo; Sunderlin, William D; Verchot, Louis V; Herold, Martin

    2013-01-01

    A functional measuring, monitoring, reporting and verification (MRV) system is essential to assess the additionality and impact on forest carbon in REDD+ (reducing emissions from deforestation and degradation) projects. This study assesses the MRV capacity and readiness of project developers at 20 REDD+ projects in Brazil, Peru, Cameroon, Tanzania, Indonesia and Vietnam, using a questionnaire survey and field visits. Nineteen performance criteria with 76 indicators were formulated in three categories, and capacity was measured with respect to each category. Of the 20 projects, 11 were found to have very high or high overall MRV capacity and readiness. At the regional level, capacity and readiness tended to be highest in the projects in Brazil and Peru and somewhat lower in Cameroon, Tanzania, Indonesia and Vietnam. Although the MRV capacities of half the projects are high, there are capacity deficiencies in other projects that are a source of concern. These are not only due to limitations in technical expertise, but can also be attributed to the slowness of international REDD+ policy formulation and the unclear path of development of the forest carbon market. Based on the study results, priorities for MRV development and increased investment in readiness are proposed. (letter)

  19. Cloud/Fog Computing System Architecture and Key Technologies for South-North Water Transfer Project Safety

    Directory of Open Access Journals (Sweden)

    Yaoling Fan

    2018-01-01

    Full Text Available In view of the real-time and distributed features of Internet of Things (IoT safety system in water conservancy engineering, this study proposed a new safety system architecture for water conservancy engineering based on cloud/fog computing and put forward a method of data reliability detection for the false alarm caused by false abnormal data from the bottom sensors. Designed for the South-North Water Transfer Project (SNWTP, the architecture integrated project safety, water quality safety, and human safety. Using IoT devices, fog computing layer was constructed between cloud server and safety detection devices in water conservancy projects. Technologies such as real-time sensing, intelligent processing, and information interconnection were developed. Therefore, accurate forecasting, accurate positioning, and efficient management were implemented as required by safety prevention of the SNWTP, and safety protection of water conservancy projects was effectively improved, and intelligential water conservancy engineering was developed.

  20. Two-stage commercial evaluation of engineering systems production projects for high-rise buildings

    Science.gov (United States)

    Bril, Aleksander; Kalinina, Olga; Levina, Anastasia

    2018-03-01

    The paper is devoted to the current and debatable problem of methodology of choosing the effective innovative enterprises for venture financing. A two-stage system of commercial innovation evaluation based on the UNIDO methodology is proposed. Engineering systems account for 25 to 40% of the cost of high-rise residential buildings. This proportion increases with the use of new construction technologies. Analysis of the construction market in Russia showed that the production of internal engineering systems elements based on innovative technologies has a growth trend. The production of simple elements is organized in small enterprises on the basis of new technologies. The most attractive for development is the use of venture financing of small innovative business. To improve the efficiency of these operations, the paper proposes a methodology for a two-stage evaluation of small business development projects. A two-stage system of commercial evaluation of innovative projects allows creating an information base for informed and coordinated decision-making on venture financing of enterprises that produce engineering systems elements for the construction business.