  1. Expansion planning for electrical generating systems

    International Nuclear Information System (INIS)

    1984-01-01

    The guidebook outlines the general principles of electric power system planning in the context of energy and economic planning in general. It describes the complexities of electric system expansion planning that are due to the time dependence of the problem and the interrelation between the main components of the electric system (generation, transmission and distribution). Load forecasting methods are discussed and the principal models currently used for electric system expansion planning presented. Technical and economic information on power plants is given. Constraints imposed on power system planning by plant characteristics (particularly nuclear power plants) are discussed, as well as factors such as transmission system development, environmental considerations, availability of manpower and financial resources that may affect the proposed plan. A bibliography supplements the references that appear in each chapter, and a comprehensive glossary defines terms used in the guidebook

  2. Combined heuristic with fuzzy system to transmission system expansion planning

    Energy Technology Data Exchange (ETDEWEB)

    Silva Sousa, Aldir; Asada, Eduardo N. [University of Sao Paulo, Sao Carlos School of Engineering, Department of Electrical Engineering Av. Trabalhador Sao-carlense, 400, 13566-590 Sao Carlos, SP (Brazil)

    2011-01-15

    A heuristic algorithm that employs fuzzy logic is proposed to the power system transmission expansion planning problem. The algorithm is based on the divide to conquer strategy, which is controlled by the fuzzy system. The algorithm provides high quality solutions with the use of fuzzy decision making, which is based on nondeterministic criteria to guide the search. The fuzzy system provides a self-adjusting mechanism that eliminates the manual adjustment of parameters to each system being solved. (author)

  3. Advanced methodology for generation expansion planning including interconnected systems

    Energy Technology Data Exchange (ETDEWEB)

    Zhao, M; Yokoyama, R; Yasuda, K [Tokyo Metropolitan Univ. (Japan); Sasaki, H [Hiroshima Univ. (Japan); Ogimoto, K [Electric Power Development Co. Ltd., Tokyo (Japan)

    1994-12-31

    This paper reviews advanced methodology for generation expansion planning including interconnected systems developed in Japan, putting focus on flexibility and efficiency in a practical application. First, criteria for evaluating flexibility of generation planning considering uncertainties are introduced. Secondly, the flexible generation mix problem is formulated as a multi-objective optimization with more than two objective functions. The multi-objective optimization problem is then transformed into a single objective problem by using the weighting method, to obtain the Pareto optimal solution, and solved by a dynamics programming technique. Thirdly, a new approach for electric generation expansion planning of interconnected systems is presented, based on the Benders Decomposition technique. That is, large scale generation problem constituted by the general economic load dispatch problem, and several sub problems which are composed of smaller scale isolated system generation expansion plans. Finally, the generation expansion plan solved by an artificial neural network is presented. In conclusion, the advantages and disadvantages of this method from the viewpoint of flexibility and applicability to practical generation expansion planning are presented. (author) 29 refs., 10 figs., 4 tabs.

  4. DYNAMIC PROGRAMMING – EFFICIENT TOOL FOR POWER SYSTEM EXPANSION PLANNING

    Directory of Open Access Journals (Sweden)

    SIMO A.

    2015-03-01

    Full Text Available The paper isfocusing on dynamic programming use for power system expansion planning (EP – transmission network (TNEP and distribution network (DNEP. The EP problem has been approached from the retrospective and prospective point of view. To achieve this goal, the authors are developing two software-tools in Matlab environment. Two techniques have been tackled: particle swarm optimization (PSO and genetic algorithms (GA. The case study refers to Test 25 buses test power system developed within the Power Systems Department.

  5. Sensitivity analysis in electric system expansion planning study using DECADES

    International Nuclear Information System (INIS)

    Perez Martin, D.; Lopez Lopez, I.

    1998-01-01

    To cover the increasing electricity demand as a key economic and social factor of development, it is necessary to have adequate expansion police. The delay in installation of certain capabilities produces electricity deficit. In other hand, construction of oversized capacities generates excessive costs. Therefore it is important to acquire or develop adequate methodologies according to the country specific conditions to carry out electric expansion planning studies. The goal is to chose optimal solutions in order to reach sustainable development using owns energy resources and preserving the environment. In the paper the Decades methodology is used for electricity system expansion planning. Premises and main assumptions for the calculations are presented. Some electric system expansion cases are evaluated. We also present the results of a sensibility study varying the discount rate, loss of load probability energy not served cost, fuel availability and fuel and investment costs. The reliability criteria currently not used in Cuban electric system are evaluated. We discuss the results and display the conclusions and recommendations

  6. Combination of AC Transmission Expansion Planning and Reactive Power Planning in the restructured power system

    International Nuclear Information System (INIS)

    Hooshmand, Rahmat-Allah; Hemmati, Reza; Parastegari, Moein

    2012-01-01

    Highlights: ► To overcome the disadvantages of DC model in Transmission Expansion Planning, AC model should be used. ► The Transmission Expansion Planning associated with Reactive Power Planning results in fewer new transmission lines. ► Electricity market concepts should be considered in Transmission Expansion Planning problem. ► Reliability aspects should be considered in Transmission Expansion Planning problem. ► Particle Swarm Optimization is a suitable optimization method to solve Transmission Expansion Planning problem. - Abstract: Transmission Expansion Planning (TEP) is an important issue in power system studies. It involves decisions on location and number of new transmission lines. Before deregulation of the power system, the goal of TEP problem was investment cost minimization. But in the restructured power system, nodal prices, congestion management, congestion surplus and so on, have been considered too. In this paper, an AC model of TEP problem (AC-TEP) associated with Reactive Power Planning (RPP) is presented. The goals of the proposed planning problem are to minimize investment cost and maximize social benefit at the same time. In the proposed planning problem, in order to improve the reliability of the system the Expected Energy Not Supplied (EENS) index of the system is limited by a constraint. For this purpose, Monte Carlo simulation method is used to determine the EENS. Particle Swarm Optimization (PSO) method is used to solve the proposed planning problem which is a nonlinear mixed integer optimization problem. Simulation results on Garver and RTS systems verify the effectiveness of the proposed planning problem for reduction of the total investment cost, EENS index and also increasing social welfare of the system.

  7. A computational model for determining the minimal cost expansion alternatives in transmission systems planning

    International Nuclear Information System (INIS)

    Pinto, L.M.V.G.; Pereira, M.V.F.; Nunes, A.

    1989-01-01

    A computational model for determining an economical transmission expansion plan, based in the decomposition techniques is presented. The algorithm was used in the Brazilian South System and was able to find an optimal solution, with a low computational resource. Some expansions of this methodology are been investigated: the probabilistic one and the expansion with financier restriction. (C.G.C.). 4 refs, 7 figs

  8. Analysis of the security during power system expansion planning

    Directory of Open Access Journals (Sweden)

    Osak Alexey

    2017-01-01

    Full Text Available Increasing the intelligent level of the EPS control systems, caused by the implementation of Smart technologies, changes the structure and the properties of EPS and increases the importance of system reliability analysis. System reliability analysis includes two components – for the balance and for the regime. On the one hand, there is a large number of studies to assess the reliability of the power system, which examines various aspects and methods of solving this problem. On the other hand, in Russia there is no generally accepted methodology with clear criteria that could be used for feasibility studies of various technical solutions taking into consideration system reliability aspects. In practice, the security analysis is limited by the calculations of power flows, static and dynamic stability for a number of forecast periods for the normal and repair circuits considering the most severe disturbances. The existing approach allows defining the requirements and adjusting emergency control systems, but does not allow evaluating and comparing solutions for power grid constructions. The authors propose a new method for power system reliability evaluation, which is suitable for planning development and operation of power systems. The method includes a general description of the algorithm which allows to compare various development scenarios, as well as to assess the reliability level of their implementation. In particular, the method allows to determine where it is needed only the relay protection and emergency control system development, and where it is necessary grid, protection and control development and reconstruction.

  9. Multi criteria analysis for the long term planning of the mexican electrical system expansion - 337

    International Nuclear Information System (INIS)

    Martin-del-Campo, C.; Guadarrama, R.; Francois, J.L.

    2010-01-01

    A multi-criteria analysis was applied to the long term electricity expansion planning for Mexico for the 2008-2030 period. This methodology is based on a fuzzy logic inference system, which allows for the definition of a decision function that takes into account all the evaluation parameters. This function permits one to rank the alternative expansion plans in order to determine the most attractive option. In this study four evaluation parameters were considered: (a) the total generating cost obtained from an optimization expansion using the WASP-IV model, (b) the economic risk associated with fuel prices increases, (c) the diversity of technologies in the mix, and (d) the external costs. The analysis was applied to a base case and to three additional expansion cases, which are very similar to the base case, but each of them excludes the addition of a certain type of candidate technology in the optimization planning. The base case is Plan A which has six candidate technologies available for the optimization planning. Plan B excludes coal; Plan C excludes oil, and Plan D excludes nuclear energy. After the decision analysis was made it was found that Plan B is best followed by Plan A, then Plan C and finally Plan D. The worst plan expansion was obtained when the nuclear candidate was excluded in the program of additions during the time period. The primary conclusion is that nuclear energy must participate in the mix of electricity generation. This result can be used to define the energy policy for electricity production in Mexico in the medium-long term scenario. (authors)

  10. WASP as a planning tool of electrical generation systems expansion

    International Nuclear Information System (INIS)

    D'Isidoro, G.

    1984-01-01

    The ''Wien Automatic System Package'' (WASP), consists of six modules or computer programmes which assist in decision taking process in expanding an electrical generation network. A general description of this model is made and some conclusions are drawn from the data processed to this date

  11. Generation expansion planning of the electrical power system in West Java

    International Nuclear Information System (INIS)

    Nengah Sudja.

    1975-01-01

    A thorough study on the generation expansion planning of the electrical power system, covering mathematical and computerized calculations, and financial analysis on the daily load, the load duration, and the assumption of future load, supporting the idea for building nuclear power plants in Indonesia, is presented. (RUW)

  12. An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system

    International Nuclear Information System (INIS)

    Elkarmi, Fawwaz; Abu-Shikhah, Nazih; Abu-Zarour, Mohammad

    2010-01-01

    Many factors contribute to the planning process of power systems. In the context of expansion planning, focus is paid to selection criteria that enable the optimization of related factors that will result in the best performance. This is described as meeting demand whilst reducing costs and maintaining minimal risk in operation. In this paper, different criteria used in the planning of power system expansion studies are investigated with the objective of identifying their impact on the expansion plan. The results of these criteria on the expansion study of the Jordanian power system are presented. Results show good correspondence to the actual adopted solutions. The spinning reserve is the most influential planning criterion on the overall system expansion cost. This is followed by the peak load changes, and the forced outage rate of the candidate units used for capacity additions to meet future expected demand. Finally, the loss of load expectation and cost of energy not served have the least effect on the overall system expansion cost. These results highlight the importance to be placed on performing sensitivity analyses to determine the most cost effective and acceptable expansion plan of the electric power system. There is a need to continually update the planning criteria to cater for changes and developments in the power system and the economic situation. Finally, the methodology of this study can be generalized to other power systems.

  13. An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system

    Energy Technology Data Exchange (ETDEWEB)

    Elkarmi, Fawwaz; Abu-Shikhah, Nazih [Al-Ahliyya Amman University, College of Engineering, AA University Post Office, Zip code 19328 (Jordan); Abu-Zarour, Mohammad [NEPCO, Department of Generation Planning, P.O. Box 2310, Amman 11194 (Jordan)

    2010-10-15

    Many factors contribute to the planning process of power systems. In the context of expansion planning, focus is paid to selection criteria that enable the optimization of related factors that will result in the best performance. This is described as meeting demand whilst reducing costs and maintaining minimal risk in operation. In this paper, different criteria used in the planning of power system expansion studies are investigated with the objective of identifying their impact on the expansion plan. The results of these criteria on the expansion study of the Jordanian power system are presented. Results show good correspondence to the actual adopted solutions. The spinning reserve is the most influential planning criterion on the overall system expansion cost. This is followed by the peak load changes, and the forced outage rate of the candidate units used for capacity additions to meet future expected demand. Finally, the loss of load expectation and cost of energy not served have the least effect on the overall system expansion cost. These results highlight the importance to be placed on performing sensitivity analyses to determine the most cost effective and acceptable expansion plan of the electric power system. There is a need to continually update the planning criteria to cater for changes and developments in the power system and the economic situation. Finally, the methodology of this study can be generalized to other power systems. (author)

  14. Decision analysis in the expansion planning of the Mexican Electrical System

    International Nuclear Information System (INIS)

    Toupiol, S.; Martin del Campo M, C.; Ortega C, R.

    2007-01-01

    In the last years, the planning of the National Interconnected System has been guided mainly to technologies of combined cycle, contributing to the establishment of a generation system little diversified and clerk of the readiness and volatility of the prices of natural gas. On the other hand, the electric system continues expanding without to consider the emissions of gases coming from the electric generation and the significant participation of the renewable and nuclear technologies in the production of electricity like decisive parameters for the long term planning, for what the developed plans are economically attractive but they don't contribute to the respect of the environment, to the sustainable development, neither to the diversification. With base to the above-mentioned intended in this work to develop viable outlines for the long term expansion of the National Interconnected System (period 2005-2024), appealing to the pattern of uni nodal planning that uses the Federal Commission of Electricity at the moment (CFE) that is to say the pattern WASP given by the International Atomic Energy Agency. This way, you fixed as objective to propose two expansion alternatives to the reference plan developed by the CFE in 2005 for the period 2005-2024, with the purpose of not only looking for the good plan of these three plans in terms of the total cost of generation, but also in terms of the risk associated to the price of natural gas, the emissions of dioxide of sulfur and nitrogen oxides generated by the plants of the system and the diversity of the generation park. To compare the three developed plans, you applies an analysis of decision of multiple approaches based on the approach of Savage. Finally, starting from this analysis, he/she intended to determine if the plan of minimum cost represents the long term better option or if it suits but to expand the system being based on a plan that represents the best commitment cost-risk-emission-diversity. (Author)

  15. Impact of Operating Rules on Planning Capacity Expansion of Urban Water Supply Systems

    Science.gov (United States)

    de Neufville, R.; Galelli, S.; Tian, X.

    2017-12-01

    This study addresses the impact of operating rules on capacity planning of urban water supply systems. The continuous growth of metropolitan areas represents a major challenge for water utilities, which often rely on industrial water supply (e.g., desalination, reclaimed water) to complement natural resources (e.g., reservoirs). These additional sources increase the reliability of supply, equipping operators with additional means to hedge against droughts. How do their rules for using industrial water supply impact the performance of water supply system? How might it affect long-term plans for capacity expansion? Possibly significantly, as demonstrated by the analysis of the operations and planning of a water supply system inspired by Singapore. Our analysis explores the system dynamics under multiple inflow and management scenarios to understand the extent to which alternative operating rules for the use of industrial water supply affect system performance. Results first show that these operating rules can have significant impact on the variability in system performance (e.g., reliability, energy use) comparable to that of hydro-climatological conditions. Further analyses of several capacity expansion exercises—based on our original hydrological and management scenarios—show that operating rules significantly affect the timing and magnitude of critical decisions, such as the construction of new desalination plants. These results have two implications: Capacity expansion analysis should consider the effect of a priori uncertainty about operating rules; and operators should consider how their flexibility in operating rules can affect their perceived need for capacity.

  16. Impact of forecast errors on expansion planning of power systems with a renewables target

    DEFF Research Database (Denmark)

    Pineda, Salvador; Morales González, Juan Miguel; Boomsma, Trine Krogh

    2015-01-01

    This paper analyzes the impact of production forecast errors on the expansion planning of a power system and investigates the influence of market design to facilitate the integration of renewable generation. For this purpose, we propose a programming modeling framework to determine the generation...... and transmission expansion plan that minimizes system-wide investment and operating costs, while ensuring a given share of renewable generation in the electricity supply. Unlike existing ones, this framework includes both a day-ahead and a balancing market so as to capture the impact of both production forecasts...... and the associated prediction errors. Within this framework, we consider two paradigmatic market designs that essentially differ in whether the day-ahead generation schedule and the subsequent balancing re-dispatch are co-optimized or not. The main features and results of the model set-ups are discussed using...

  17. Development of the computer model by using LINGO for Electric System Expansion Planning

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Man Ki; Kim, Seung Su [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-05-01

    The main purpose of this study is to develop the electric system expansion planning model based on linear programming method and to describe how to use the model. The algorithm of linear programming is provided by LINGO. The decision variables are electric generation capacity per period and electricity generated by fuel types per year. Integer program is implemented in the model in order to consider indivisibility of electric capacities. The model also allows the constraint of CO{sub 2} to be considered in the planning. (Author) 4 refs.,.

  18. An optimization framework for the integrated planning of generation and transmission expansion in interconnected power systems

    International Nuclear Information System (INIS)

    Guerra, Omar J.; Tejada, Diego A.; Reklaitis, Gintaras V.

    2016-01-01

    Highlights: • A novel optimization framework for the design and planning of interconnected power systems is proposed. • The framework integrates generation and transmission capacity expansion planning. • Reserve and emission constraints are included. • Business as usual and CO_2 mitigation policy scenarios are evaluated. • Reconfiguration of existing power generation technologies is the most cost-effective option for CO_2 emissions mitigation. - Abstract: Energy, and particularly electricity, has played and will continue to play a very important role in the development of human society. Electricity, which is the most flexible and manageable energy form, is currently used in a variety of activities and applications. For instance, electricity is used for heating, cooling, lighting, and for operating electronic appliances and electric vehicles. Nowadays, given the rapid development and commercialization of technologies and devices that rely on electricity, electricity demand is increasing faster than overall primary energy supply. Consequently, the design and planning of power systems is becoming a progressively more important issue in order to provide affordable, reliable and sustainable energy in timely fashion, not only in developed countries but particularly in developing economies where electricity demand is increasing even faster. Power systems are networks of electrical devices, such as power plants, transformers, and transmission lines, used to produce, transmit, and supply electricity. The design and planning of such systems require the selection of generation technologies, along with the capacity, location, and timing of generation and transmission capacity expansions to meet electricity demand over a long-term horizon. This manuscript presents a comprehensive optimization framework for the design and planning of interconnected power systems, including the integration of generation and transmission capacity expansion planning. The proposed

  19. PLN's experience with the WASP-III model in generation expansion planning for the Java system

    International Nuclear Information System (INIS)

    Sudja, N.; Afiff, A.; Simarmata, B.

    1988-01-01

    The State Electric Power Corporation of Indonesia (PLN) was one of the first recipients of the WASP computer model, and since 1976 has been using the model (first the version WASP-II, and later the WASP-III version) for carrying out generation expansion planning studies for the country, and particularly, for the Java power system. This paper discusses PLN's experience with WASP-III and comments on some problems and constraints encountered, particularly: the time-fixed forced outage rate (FOR) assumed for generating units, simulation of the hydro system and computation time. The paper concludes with some suggestions about future enhancements to WASP-III. (author). 3 figs, 11 tabs

  20. Power system generation expansion planning using the maximum principle and analytical production cost model

    International Nuclear Information System (INIS)

    Lee, K.Y.; Park, Y.M.

    1991-01-01

    Historically, the electric utility demand in most countries has increased rapidly, with a doubling of approximately 10 years in the case of developing countries. In order to meet this growth in demand, the planners of expansion policies were concerned with obtaining expansion pans which dictate what new generation facilities to add and when to add them. This paper reports that, however, the practical planning problem is extremely difficult and complex, and required many hours of the planner's time even though the alternatives examined were extremely limited. In this connection, increased motivation for more sophisticated techniques of valuating utility expansion policies has been developed during the past decade. Among them, the long-range generation expansion planning is to select the most economical and reliable generation expansion plans in order to meet future power demand over a long period of time subject to a multitude of technical, economical, and social constraints

  1. Problems of heat sources modeling on stage of isolated power systems expansion planning

    International Nuclear Information System (INIS)

    Malenkov, A.V.; Reshetnikova, L.N.; Sergeev, Yu.A.

    1998-01-01

    It is necessary to use computer codes for evaluation of possible applications and role of nuclear district heating plants in the local self-balancing power and heating systems, which are to be located in the remote isolated and hardly accessible regions in the Far North of Russia. Key factors in determining system configurations and its performances are: (1) interdependency of electricity, heat and fuel supply; (2) long distance between energy consumer centres (from several tens up to some hundred kilometers); and (3) difficulty in export and import of the electricity, especially the fuel in and from neighbouring and remote regions. The problem to challenge is to work out an optimum expansion plan of the local electricity and heat supply system. The ENPEP (ENergy and Power Evaluation Program) software package, which was developed by IAEA together with the USA Argonne National Laboratory, was chosen for this purpose. The Chaun-Bilibino power system (CBPS), an isolated power system in far North-East region of Russia, was selected as the first case of the ENPEP study. ENPEP allows a complex approach in the system expansion optimization planning in the time frame of planning period of up to 30 years. The key ENPEP module, ELECTRIC, considers electricity as the only product. The cogeneration part (heat production) must be considered outside the ELECTRIC model and then the results to be transfer ed to ELECTRIC. The ENPEP study on the Chaun-Bilibino isolated power system has shown that the modelling of the heat supply sources in ENPEP is not a trivial problem. It is very important and difficult to correctly represent specific features of cogeneration process at the same time. (author)

  2. Decennial plan of expansion 1994-2003

    International Nuclear Information System (INIS)

    1993-12-01

    The Decennial Plan of Expansion 1994-2003 of Electric sector reproduces the results of the studies occurred during the planning cycle of 1992/93 from the Coordinator Groups of the Electric System Planning. Based in the market forecasting, economic-financier and time for finishing the the works, the Decennial Plan of Expansion presents the schedule of the main generation and transmission works for the next ten years, the annual spend in generation, transmission and distribution, the costs of expansion and the evaluation of attending conditions in electric system in Brazil. (C.G.C.)

  3. Thai gas expansion plans

    International Nuclear Information System (INIS)

    Hayes, D.

    2001-01-01

    Demand for natural gas in Thailand is increasing significantly as the Electricity Generating Authority of Thailand and the independent private power producers (IPPs) switch from oil to gas to fire their power stations in line with Government policy to reduce oil imports and use more gas from the Gulf of Thailand. The Petroleum Authority of Thailand (PTT) has the sole right to buy and sell natural gas and other petroleum products in Thailand. According to PTT, the surge in demand for natural gas in the first half of 2001 was matched by a fall in demand for refined oil products. The PTT has received Government approval to convert to a limited company ready for listing on the Thai Stock Exchange. This is expected to further increase gas consumption. Details of gas sales to power generation and other industrial sectors by PTT and Unocal, Thailand's largest producer, are given. PTT operations include work to extend its gas pipeline transmission system. A number of new pipeline schemes are planned, including one across southern Thailand to transfer offshore gas from the Joint Development Area gas field owned by Thailand and Malaysia. This has encountered protests over the proposed plant and pipeline route

  4. Optimal expansion planning of stand-alone systems with stochastic simulations

    Energy Technology Data Exchange (ETDEWEB)

    Hoese, Alejandro [Instituto de Energia Electrica (IEE), Universidad Nacional de San Juan, (Argentina)

    1997-12-31

    Stand-alone systems in the range of 1 kW - 10 MW are taking relevance in the new (global) liberal concept of energy market. State and private investors are becoming increasingly attention on the use of renewable for these systems, but it must be shown that these non-conventional solutions are competitive with the established conventional ones. The high investment costs and the technical and economic uncertainties coupled with the use of time-dependent energy sources are the mainly inhibiting factors for the decision agents to choose these systems instead of conventional ones. In the paper a new model for optimal expansion planning of hybrid stand-alone generating systems under consideration of uncertainties is presented. This model is at present in {sup d}evelopment state{sup .} Results already obtained in the first steps of this research are promising and some of them are here presented. [Espanol] Los sistemas autocontenidos en el rango de 1 Kw a 10 MW estan tomando importancia en el nuevo (global) concepto liberal del mercado de la energia. Inversionistas privados y del Estado estan poniendo mayor atencion en el uso de energias renovables para estos sistemas, pero debe mostrarse que estas soluciones no-convencionales son competitivas con las convencionales establecidas. Los altos costos de inversion y las incertidumbres tecnicas y economicas aunadamente con el uso de fuentes de energia dependientes del tiempo son los principales factores inhibidores de los factores de decision para escoger estos sistemas en lugar de los convencionales. En este articulo se presenta un nuevo modelo de planeacion de expansion optima de sistemas hibridos autocontenidos de generacion electrica bajo la consideracion de incertidumbres. Este modelo esta actualmente en {sup e}stado de desarrollo{sup .} Los resultados ya obtenidos en las primeras etapas de esta investigacion son prometedores y se presentan algunos de ellos.

  5. Optimal expansion planning of stand-alone systems with stochastic simulations

    Energy Technology Data Exchange (ETDEWEB)

    Hoese, Alejandro [Instituto de Energia Electrica (IEE), Universidad Nacional de San Juan, (Argentina)

    1998-12-31

    Stand-alone systems in the range of 1 kW - 10 MW are taking relevance in the new (global) liberal concept of energy market. State and private investors are becoming increasingly attention on the use of renewable for these systems, but it must be shown that these non-conventional solutions are competitive with the established conventional ones. The high investment costs and the technical and economic uncertainties coupled with the use of time-dependent energy sources are the mainly inhibiting factors for the decision agents to choose these systems instead of conventional ones. In the paper a new model for optimal expansion planning of hybrid stand-alone generating systems under consideration of uncertainties is presented. This model is at present in {sup d}evelopment state{sup .} Results already obtained in the first steps of this research are promising and some of them are here presented. [Espanol] Los sistemas autocontenidos en el rango de 1 Kw a 10 MW estan tomando importancia en el nuevo (global) concepto liberal del mercado de la energia. Inversionistas privados y del Estado estan poniendo mayor atencion en el uso de energias renovables para estos sistemas, pero debe mostrarse que estas soluciones no-convencionales son competitivas con las convencionales establecidas. Los altos costos de inversion y las incertidumbres tecnicas y economicas aunadamente con el uso de fuentes de energia dependientes del tiempo son los principales factores inhibidores de los factores de decision para escoger estos sistemas en lugar de los convencionales. En este articulo se presenta un nuevo modelo de planeacion de expansion optima de sistemas hibridos autocontenidos de generacion electrica bajo la consideracion de incertidumbres. Este modelo esta actualmente en {sup e}stado de desarrollo{sup .} Los resultados ya obtenidos en las primeras etapas de esta investigacion son prometedores y se presentan algunos de ellos.

  6. Decision analysis in the expansion planning of the Mexican Electrical System; Analisis de decision en la planificacion de la expansion del Sistema Electrico Mexicano

    Energy Technology Data Exchange (ETDEWEB)

    Toupiol, S.; Martin del Campo M, C.; Ortega C, R. [Departamento de Sistemas Energeticos, Facultad de Ingenieria UNAM, Circuito Exterior s/n, Ciudad Universitaria, 04510 Mexico D.F. (Mexico)]. e-mail: stoupiol@yahoo.fr

    2007-07-01

    In the last years, the planning of the National Interconnected System has been guided mainly to technologies of combined cycle, contributing to the establishment of a generation system little diversified and clerk of the readiness and volatility of the prices of natural gas. On the other hand, the electric system continues expanding without to consider the emissions of gases coming from the electric generation and the significant participation of the renewable and nuclear technologies in the production of electricity like decisive parameters for the long term planning, for what the developed plans are economically attractive but they don't contribute to the respect of the environment, to the sustainable development, neither to the diversification. With base to the above-mentioned intended in this work to develop viable outlines for the long term expansion of the National Interconnected System (period 2005-2024), appealing to the pattern of uni nodal planning that uses the Federal Commission of Electricity at the moment (CFE) that is to say the pattern WASP given by the International Atomic Energy Agency. This way, you fixed as objective to propose two expansion alternatives to the reference plan developed by the CFE in 2005 for the period 2005-2024, with the purpose of not only looking for the good plan of these three plans in terms of the total cost of generation, but also in terms of the risk associated to the price of natural gas, the emissions of dioxide of sulfur and nitrogen oxides generated by the plants of the system and the diversity of the generation park. To compare the three developed plans, you applies an analysis of decision of multiple approaches based on the approach of Savage. Finally, starting from this analysis, he/she intended to determine if the plan of minimum cost represents the long term better option or if it suits but to expand the system being based on a plan that represents the best commitment cost-risk-emission-diversity. (Author)

  7. A decision support system for generation expansion planning in competitive electricity markets

    International Nuclear Information System (INIS)

    Pereira, Adelino J.C.; Saraiva, Joao Tome

    2010-01-01

    This paper describes an approach to address the generation expansion-planning problem in order to help generation companies to decide whether to invest on new assets. This approach was developed in the scope of the implementation of electricity markets that eliminated the traditional centralized planning and lead to the creation of several generation companies competing for the delivery of power. As a result, this activity is more risky than in the past and so it is important to develop decision support tools to help generation companies to adequately analyse the available investment options in view of the possible behavior of other competitors. The developed model aims at maximizing the expected revenues of a generation company while ensuring the safe operation of the power system and incorporating uncertainties related with price volatility, with the reliability of generation units, with the demand evolution and with investment and operation costs. These uncertainties are modeled by pdf functions and the solution approach is based on Genetic Algorithms. Finally, the paper includes a Case Study to illustrate the application and interest of the developed approach. (author)

  8. A decision support system for generation expansion planning in competitive electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Pereira, Adelino J.C. [Departamento de Engenharia Electrotecnica, Instituto Superior de Engenharia de Coimbra, Instituto Politecnico de Coimbra, Rua Pedro Nunes, 3030-199 Coimbra (Portugal); Saraiva, Joao Tome [INESC Porto and Departamento de Engenharia Electrotecnica e Computadores, Faculdade de Engenharia da Universidade do Porto, Campus da FEUP, Rua Dr. Roberto Frias, 4200-465 Porto (Portugal)

    2010-07-15

    This paper describes an approach to address the generation expansion-planning problem in order to help generation companies to decide whether to invest on new assets. This approach was developed in the scope of the implementation of electricity markets that eliminated the traditional centralized planning and lead to the creation of several generation companies competing for the delivery of power. As a result, this activity is more risky than in the past and so it is important to develop decision support tools to help generation companies to adequately analyse the available investment options in view of the possible behavior of other competitors. The developed model aims at maximizing the expected revenues of a generation company while ensuring the safe operation of the power system and incorporating uncertainties related with price volatility, with the reliability of generation units, with the demand evolution and with investment and operation costs. These uncertainties are modeled by pdf functions and the solution approach is based on Genetic Algorithms. Finally, the paper includes a Case Study to illustrate the application and interest of the developed approach. (author)

  9. System network planning expansion using mathematical programming, genetic algorithms and tabu search

    International Nuclear Information System (INIS)

    Sadegheih, A.; Drake, P.R.

    2008-01-01

    In this paper, system network planning expansion is formulated for mixed integer programming, a genetic algorithm (GA) and tabu search (TS). Compared with other optimization methods, GAs are suitable for traversing large search spaces, since they can do this relatively rapidly and because the use of mutation diverts the method away from local minima, which will tend to become more common as the search space increases in size. GA's give an excellent trade off between solution quality and computing time and flexibility for taking into account specific constraints in real situations. TS has emerged as a new, highly efficient, search paradigm for finding quality solutions to combinatorial problems. It is characterized by gathering knowledge during the search and subsequently profiting from this knowledge. The attractiveness of the technique comes from its ability to escape local optimality. The cost function of this problem consists of the capital investment cost in discrete form, the cost of transmission losses and the power generation costs. The DC load flow equations for the network are embedded in the constraints of the mathematical model to avoid sub-optimal solutions that can arise if the enforcement of such constraints is done in an indirect way. The solution of the model gives the best line additions and also provides information regarding the optimal generation at each generation point. This method of solution is demonstrated on the expansion of a 10 bus bar system to 18 bus bars. Finally, a steady-state genetic algorithm is employed rather than generational replacement, also uniform crossover is used

  10. Energy expansion planning by considering electrical and thermal expansion simultaneously

    International Nuclear Information System (INIS)

    Abbasi, Ali Reza; Seifi, Ali Reza

    2014-01-01

    Highlights: • This paper focused on the expansion planning optimization of energy systems. • Employing two form of energy: the expansion of electrical and thermal energies. • The main objective is to minimize the costs. • A new Modified Honey Bee Mating Optimization (MHBMO) algorithm is applied. - Abstract: This study focused on the expansion planning optimization of energy systems employing two forms of energy: the expansion of electrical and thermal energies simultaneously. The main objective of this investigation is confirming network adequacy by adding new equipment to the network, over a given planning horizon. The main objective of the energy expansion planning (EEP) is to minimize the real energy loss, voltage deviation and the total cost of installation equipments. Since the objectives are different and incommensurable, it is difficult to solve the problem by the conventional approaches that may optimize a single objective. So, the meta-heuristic algorithm is applied to this problem. Here, Honey Bee Mating Optimization algorithm (HBMO) as a new evolutionary optimization algorithm is utilized. In order to improve the total ability of HBMO for the global search and exploration, a new modification process is suggested such a way that the algorithm will search the total search space globally. Also, regarding the uncertainties of the new complicated energy systems, in this paper for the first time, the EEP problem is investigated in a stochastic environment by the use of probabilistic load flow technique based on Point Estimate Method (PEM). In order to evaluate the feasibility and effectiveness of the proposed algorithm, two modified test systems are used as case studies

  11. Considering FACTS in Optimal Transmission Expansion Planning

    Directory of Open Access Journals (Sweden)

    K. Soleimani

    2017-10-01

    Full Text Available The expansion of power transmission systems is an important part of the expansion of power systems that requires enormous investment costs. Since the construction of new transmission lines is very expensive, it is necessary to choose the most efficient expansion plan that ensures system security with a minimal number of new lines. In this paper, the role of Flexible AC Transmission System (FACTS devices in the effective operation and expansion planning of transmission systems is examined. Effort was taken to implement a method based on sensitivity analysis to select the optimal number and location of FACTS devices, lines and other elements of the transmission system. Using this method, the transmission expansion plan for a 9 and a 39 bus power system was performed with and without the presence of FACTS with the use of DPL environment in Digsilent software 15.1. Results show that the use of these devices reduces the need for new transmission lines and minimizes the investment cost.

  12. Wien Automatic System Planning (WASP) Package. A computer code for power generating system expansion planning. Version WASP-IV. User's manual

    International Nuclear Information System (INIS)

    2001-01-01

    As a continuation of its efforts to provide methodologies and tools to Member States to carry out comparative assessment and analyse priority environmental issues related to the development of the electric power sector, the IAEA has completed a new version of the Wien Automatic System Planning (WASP) Package WASP-IV for carrying out power generation expansion planning taking into consideration fuel availability and environmental constraints. This manual constitutes a part of this work and aims to provide users with a guide to use effectively the new version of the model WASP-IV. WASP was originally developed in 1972 by the Tennessee Valley Authority and the Oak Ridge National Laboratory in the USA to meet the IAEA needs to analyse the economic competitiveness of nuclear power in comparison to other generation expansion alternatives for supplying the future electricity requirements of a country or region. Previous versions of the model were used by Member States in many national and regional studies to analyse the electric power system expansion planning and the role of nuclear energy in particular. Experience gained from its application allowed development of WASP into a very comprehensive planning tool for electric power system expansion analysis. New, improved versions were developed, which took into consideration the needs expressed by the users of the programme in order to address important emerging issues being faced by the electric system planners. In 1979, WASP-IV was released and soon after became an indispensable tool in many Member States for generation expansion planning. The WASP-IV version was continually upgraded and the development of version WASP-III Plus commenced in 1992. By 1995, WASP-III Plus was completed, which followed closely the methodology of the WASP-III but incorporated new features. In order to meet the needs of electricity planners and following the recommendations of the Helsinki symposium, development of a new version of WASP was

  13. Planning method for integration and expansion of renewable energy sources with special attention to security supply in distribution system

    Energy Technology Data Exchange (ETDEWEB)

    Cerda-Arias, Jose Luis

    2012-07-01

    Today's structure of power systems with competitive wholesale markets for electricity encourages the introduction of new agents and products, customers with self-generating capacity and the specialization of generators, network operators and power suppliers. Furthermore one has to take into account the variation of the fossil fuel prices in the world market, which even anticipates the closeness of its scarcity, the instability of the fulfilment of contracts, and the existence of import restrictions. In addition the implementation of policies aiming to control CO{sub 2} emissions, and efficient use of energy plus the advent of more efficient technologies have to be incorporated in new network expansion projects. These are forcing utilities and society to seek new forms of electric system expansion without affecting their economic growth. This expresses a challenge to sustain such a growth changing the vision for the power system and the required security of electricity supply, usually based on internal factors of the electric sector, without considering the connection between the current transmission and distribution networks, the uncertainties related to the competition in the electricity market and the effect of distributed generation units. The high penetration of distributed generation resources, based on renewable energy sources, is increasingly observed worldwide and it depends on the cost of the technologies, market design, and subsidies. On that account, it is necessary to find alternatives and offers to develop a sustainable strategic plan for power system expansion. Currently, efforts are oriented to develop planning models which consider the income of power generation based on renewable energy sources founded on these new requirements, bearing in mind the relationship between the competitive markets and the power system planning. In this Thesis a general planning method for the expansion of the power grids is proposed. This planning method should

  14. Wien Automatic System Planning (WASP) Package. A computer code for power generating system expansion planning. Version WASP-III Plus. User's manual. Volume 1: Chapters 1-11

    International Nuclear Information System (INIS)

    1995-01-01

    As a continuation of its effort to provide comprehensive and impartial guidance to Member States facing the need for introducing nuclear power, the IAEA has completed a new version of the Wien Automatic System Planning (WASP) Package for carrying out power generation expansion planning studies. WASP was originally developed in 1972 in the USA to meet the IAEA's needs to analyze the economic competitiveness of nuclear power in comparison to other generation expansion alternatives for supplying the future electricity requirements of a country or region. The model was first used by the IAEA to conduct global studies (Market Survey for Nuclear Power Plants in Developing Countries, 1972-1973) and to carry out Nuclear Power Planning Studies for several Member States. The WASP system developed into a very comprehensive planning tool for electric power system expansion analysis. Following these developments, the so-called WASP-Ill version was produced in 1979. This version introduced important improvements to the system, namely in the treatment of hydroelectric power plants. The WASP-III version has been continually updated and maintained in order to incorporate needed enhancements. In 1981, the Model for Analysis of Energy Demand (MAED) was developed in order to allow the determination of electricity demand, consistent with the overall requirements for final energy, and thus, to provide a more adequate forecast of electricity needs to be considered in the WASP study. MAED and WASP have been used by the Agency for the conduct of Energy and Nuclear Power Planning Studies for interested Member States. More recently, the VALORAGUA model was completed in 1992 as a means for helping in the preparation of the hydro plant characteristics to be input in the WASP study and to verify that the WASP overall optimized expansion plan takes also into account an optimization of the use of water for electricity generation. The combined application of VALORAGUA and WASP permits the

  15. Problems faced with the use of the WASP model in least cost and alternative electricity system expansion planning in Romania

    Energy Technology Data Exchange (ETDEWEB)

    Breazu, F [Institute of Power Studies and Design, Bucharest (Romania)

    1997-09-01

    Romanian experience with the use of IAEA planning methodologies was effectively initiated in 1989 with the launching of a Technical Cooperation project of the IAEA for the study of the energy demand and optimal expansion plans for the electricity generation system. The experience gathered during this project was crucial for the Romanian experts who conducted the studies. As a results, now Romania has a team of well trained experts in the use of the IAEA planning models. This paper describes the principal problems faced by Romanian planners in the use of these models with emphasis on the WASP package. Suggestions for future enhancements of the package are also part of this report. (author). 5 figs.

  16. Wien Automatic System Planning (WASP) Package. A computer code for power generating system expansion planning. Version WASP-III Plus. User's manual. Volume 1: Chapters 1-11

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    As a continuation of its effort to provide comprehensive and impartial guidance to Member States facing the need for introducing nuclear power, the IAEA has completed a new version of the Wien Automatic System Planning (WASP) Package for carrying out power generation expansion planning studies. WASP was originally developed in 1972 in the USA to meet the IAEA's needs to analyze the economic competitiveness of nuclear power in comparison to other generation expansion alternatives for supplying the future electricity requirements of a country or region. The model was first used by the IAEA to conduct global studies (Market Survey for Nuclear Power Plants in Developing Countries, 1972-1973) and to carry out Nuclear Power Planning Studies for several Member States. The WASP system developed into a very comprehensive planning tool for electric power system expansion analysis. Following these developments, the so-called WASP-Ill version was produced in 1979. This version introduced important improvements to the system, namely in the treatment of hydroelectric power plants. The WASP-III version has been continually updated and maintained in order to incorporate needed enhancements. In 1981, the Model for Analysis of Energy Demand (MAED) was developed in order to allow the determination of electricity demand, consistent with the overall requirements for final energy, and thus, to provide a more adequate forecast of electricity needs to be considered in the WASP study. MAED and WASP have been used by the Agency for the conduct of Energy and Nuclear Power Planning Studies for interested Member States. More recently, the VALORAGUA model was completed in 1992 as a means for helping in the preparation of the hydro plant characteristics to be input in the WASP study and to verify that the WASP overall optimized expansion plan takes also into account an optimization of the use of water for electricity generation. The combined application of VALORAGUA and WASP permits the

  17. A bi-level programming for multistage co-expansion planning of the integrated gas and electricity system

    DEFF Research Database (Denmark)

    Zeng, Qing; Zhang, Baohua; Fang, Jiakun

    2017-01-01

    as the generation capacities, while the lower-level is formulated as an optimal economic dispatch under the operational constraints given by the upper-level decision. To solve the bi-level multi-stage programming problem, a hybrid algorithm is proposed combining the modified binary particle swarm optimization (BPSO...... power systems. The system operation is optimized and embedded in the planning horizon. A bi-level multi-stage programming problem is formulated to minimize the investment cost plus the operational cost. The upper-level optimizes the expansion plan and determines the network topology as well......) and the interior point method (IPM). The BPSO is used for the upper-level sub-problem, and the IPM is adopted for the lower-level sub-problem. Numerical case studies have been carried out on the practical gas and electricity transmission network in western Denmark. Simulation results demonstrate the effectiveness...

  18. Planning of the energy generation system expansion taking into account transmission lines; Planejamento da expansao do sistema de geracao considerando redes de transmissao

    Energy Technology Data Exchange (ETDEWEB)

    Lucio, Joao Carlos Martins

    1990-12-31

    This work presents the proposal of a methodology which, by exploring the interaction between generation and transmission systems expansion studies, aims for an Integrated Planning of Power Systems. It intends to emphasize the Integrated Planning importance so as to improve the utilization of the available resources in the electric sector and to reduce the expansion and operational costs. The work describes a procedure to consider explicitly the network for the determination of a generation system construction schedule. It considers that the transmission lines construction costs have a significant weight so that it can modify the initial generation expansion plan with the anticipation of some investments and the postponement of others, decreasing the global expansion costs. The generation and transmission systems expansion is made in an optimal way using a Graph Search Algorithm. Finally the best Integrated Plan is obtained from a final algorithm that generates a sequence of integrated plans from combination of generation and transmission algorithms. These plans are compared from a global cost point of view until a convergence criterion has been satisfied. (author) 18 refs., 5 figs., 28 tabs.

  19. Planning of the energy generation system expansion taking into account transmission lines; Planejamento da expansao do sistema de geracao considerando redes de transmissao

    Energy Technology Data Exchange (ETDEWEB)

    Lucio, Joao Carlos Martins

    1991-12-31

    This work presents the proposal of a methodology which, by exploring the interaction between generation and transmission systems expansion studies, aims for an Integrated Planning of Power Systems. It intends to emphasize the Integrated Planning importance so as to improve the utilization of the available resources in the electric sector and to reduce the expansion and operational costs. The work describes a procedure to consider explicitly the network for the determination of a generation system construction schedule. It considers that the transmission lines construction costs have a significant weight so that it can modify the initial generation expansion plan with the anticipation of some investments and the postponement of others, decreasing the global expansion costs. The generation and transmission systems expansion is made in an optimal way using a Graph Search Algorithm. Finally the best Integrated Plan is obtained from a final algorithm that generates a sequence of integrated plans from combination of generation and transmission algorithms. These plans are compared from a global cost point of view until a convergence criterion has been satisfied. (author) 18 refs., 5 figs., 28 tabs.

  20. Expansion planning of the electric systems in a competitive environment context; O planejamento da expansao dos sistemas eletricos no contexto de um ambiente competitivo

    Energy Technology Data Exchange (ETDEWEB)

    Haffner, Sergio Luis

    2000-07-01

    An integrated dynamic expansion planning model of electric energy systems model is proposed. Such model can be used by an independent structure of planning, compatible with the current competitive environment of the electric industry. The investments in generation and transmission are obtained simultaneously, taking into account a long term planning horizon that is split in multiple stages. In the proposed model, the entity responsible for the expansion planning, the Independent Expansion Planner, divulges the indicative expansion plan and other information that will be used by the sector agents to guide its investments in that area. Three network models are used (transport, DC load flow and hybrid transport-DC) in an hierarchical algorithm that uses the Benders decomposition to solve the problem of capacity expansion, considering the investment and operation costs. The original problem is separated in a master subproblem (investment) and several slave subproblems (operation). Each stage is represented by an operation subproblem and the master subproblem is solved by an specialized branch-and-bound algorithm. The operation subproblems (LP problems) are solved through the MINOS package. Strategies to improve the performance of the described algorithm are discussed and presented. The efficiency of those strategies is shown through tests using theoretical and realistic electric systems. The developed branch-and-bound algorithm and the selection techniques employed are described in details and illustrated through examples. It is presented, also, the Independent Planner role and its relevance in the current context of the national electric industry is pointed out. (author)

  1. Electric Grid Expansion Planning with High Levels of Variable Generation

    Energy Technology Data Exchange (ETDEWEB)

    Hadley, Stanton W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); You, Shutang [Univ. of Tennessee, Knoxville, TN (United States); Shankar, Mallikarjun [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Liu, Yilu [Univ. of Tennessee, Knoxville, TN (United States); Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-02-01

    Renewables are taking a large proportion of generation capacity in U.S. power grids. As their randomness has increasing influence on power system operation, it is necessary to consider their impact on system expansion planning. To this end, this project studies the generation and transmission expansion co-optimization problem of the US Eastern Interconnection (EI) power grid with a high wind power penetration rate. In this project, the generation and transmission expansion problem for the EI system is modeled as a mixed-integer programming (MIP) problem. This study analyzed a time series creation method to capture the diversity of load and wind power across balancing regions in the EI system. The obtained time series can be easily introduced into the MIP co-optimization problem and then solved robustly through available MIP solvers. Simulation results show that the proposed time series generation method and the expansion co-optimization model and can improve the expansion result significantly after considering the diversity of wind and load across EI regions. The improved expansion plan that combines generation and transmission will aid system planners and policy makers to maximize the social welfare. This study shows that modelling load and wind variations and diversities across balancing regions will produce significantly different expansion result compared with former studies. For example, if wind is modeled in more details (by increasing the number of wind output levels) so that more wind blocks are considered in expansion planning, transmission expansion will be larger and the expansion timing will be earlier. Regarding generation expansion, more wind scenarios will slightly reduce wind generation expansion in the EI system and increase the expansion of other generation such as gas. Also, adopting detailed wind scenarios will reveal that it may be uneconomic to expand transmission networks for transmitting a large amount of wind power through a long distance

  2. Planning model for the expansion of the electrical generation system with risk demarcation criteria; Modelo para la planificacion de la expansion del sistema electrico de generacion con criterios de acotamiento de riesgo

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez Galicia, Julio Alberto; Nieva Gomez, Rolando [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2009-07-01

    The general characteristics of a planning model for the electrical generation system expansion with risk demarcation criteria, as well as the main results of a representative study case of the Mexican Electrical System is presented. The model is based on a methodology of multiannual optimization for the generation expansion plans determination. In this context, every expansion plan defines the technology type to be installed, as well as the installation year, unit size and its location within a regional electric network. For this purpose, the model considers an interregional representation of the system identifying the necessary reinforcements to the capacity of the interregional connections. It also incorporates a Demarcation of Risk module that considers the uncertainty of the future scenarios of fuels prices to generate a set of expansion plans, among which includes the following: a) For every future of the fuel prices: the plan that diminishes the present value of the total cost (investment plus production). b) The plan that diminishes the economic risk derived from the uncertainty in the future of the fuel prices. c) A subgroup of expansion plans that are located in the efficient borders of decision, under the context of three criteria of interest: the economic risk, the investment cost of and the total cost in the future considered of greater relevance. [Spanish] Se presentan las caracteristicas generales de un modelo de planificacion de la expansion del sistema electrico de generacion con criterios de acotamiento de riesgo, asi como los principales resultados de un caso de estudio representativo del Sistema Electrico Mexicano. El modelo se basa en una metodologia de optimacion multi-anual para la determinacion de planes de expansion de la generacion. En este contexto, cada plan de expansion define el tipo de tecnologia que debera instalarse, asi como el ano de instalacion, el tamano de la unidad y su localizacion dentro de una red electrica regional. Para

  3. Gas fuels Taiwan's expansion plans

    International Nuclear Information System (INIS)

    Hayes, David

    2000-01-01

    The volume of liquid natural gas (LNG) imported into Taiwan is expected to double over the next ten years as the use of natural gas for power generation increases significantly. The Chinese Petroleum Corporation (CPC) expects to import 4.5 million tonnes of LNG in 2000 compared with 4 million tonnes in 1999. CPC is building an undersea, offshore pipeline from the Yung An LNG terminal in the south of Taiwan up the western coastline to the north. The pipeline will supply gas to power stations in the north and city gas companies in Taipei. Combined cycle power plant units at Tungshiao power station are converting to gas and a new power plant at Changsheng will burn LNG. More LNG power plants are planned. LNG is imported from Indonesia and Malaysia to supplement Taiwan's dwindling reserves of natural gas. As well as expanding the existing terminal at Yung An, the CPC is considering the need for a second import terminal. This would probably be financed and operated by the private sector

  4. A computational model for determining the minimal cost expansion alternatives in transmission systems planning; Um modelo computacional para determinacao de alternativas de expansao de custo minimo em planejamento de sistemas de transmissao

    Energy Technology Data Exchange (ETDEWEB)

    Pinto, L M.V.G.; Pereira, M V.F. [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Nunes, A [ELETROBRAS, Rio de Janeiro, RJ (Brazil)

    1990-12-31

    A computational model for determining an economical transmission expansion plan, based in the decomposition techniques is presented. The algorithm was used in the Brazilian South System and was able to find an optimal solution, with a low computational resource. Some expansions of this methodology are been investigated: the probabilistic one and the expansion with financier restriction. (C.G.C.). 4 refs, 7 figs.

  5. Multi-year expansion planning of large transmission networks

    Energy Technology Data Exchange (ETDEWEB)

    Binato, S; Oliveira, G C [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This paper describes a model for multi-year transmission network expansion to be used in long-term system planning. The network is represented by a linearized (DC) power flow and, for each year, operation costs are evaluated by a linear programming (LP) based algorithm that provides sensitivity indices for circuit reinforcements. A Backward/Forward approaches is proposed to devise an expansion plan over the study period. A case study with the southeastern Brazilian system is presented and discussed. (author) 18 refs., 5 figs., 1 tab.

  6. The reference electricity expansion plan of Guatemala

    International Nuclear Information System (INIS)

    Santizo, Rodolfo

    2002-01-01

    This presentation prepared by the Deputy Minister of Energy and Mines overviews the following issues: description of electric power infrastructure, price markets, expansion plans, power and energy demand projections through 2010, including bussiness opportunities for private investment on geothermal and hidro electric power production and distribution market. This presentation is intended for private investors who could be interested in bussiness opportunities of energy generation market in Guatemala

  7. IRP methods for Environmental Impact Statements of utility expansion plans

    International Nuclear Information System (INIS)

    Cavallo, J.D.; Hemphill, R.C.; Veselka, T.D.

    1992-01-01

    Most large electric utilities and a growing number of gas utilities in the United States are using a planning method -- Integrated Resource Planning (IRP) - which incorporates demand-side management (DSM) programs whenever the marginal cost of the DSM programs are lower than the marginal cost of supply-side expansion options. Argonne National Laboratory has applied the IRP method in its socio-economic analysis of an Environmental Impact Statement (EIS) of power marketing for a system of electric utilities in the mountain and western regions of the United States. Applying the IRP methods provides valuable information to the participants in an EIS process involving capacity expansion of an electric or gas utility. The major challenges of applying the IRP method within an EIS are the time consuming and costly task of developing a least cost expansion path for each altemative, the detailed quantification of environmental damages associated with capacity expansion, and the explicit inclusion of societal-impacts to the region

  8. Expansion plan of the electrical sector; Plan de expansion del sector electrico

    Energy Technology Data Exchange (ETDEWEB)

    Cristerna Ocampo, Rafael [Comision Federal de Electricidad (Mexico)

    1996-07-01

    An analysis of the Mexican electrical market in the year 1994 as far as sales of electrical energy and types of users who utilized that energy, is presented. In addition, an analysis is made of the options for the future supply, where the installed electrical capacity in Mexico in 1994 is described. Also the requirements of additional capacity of power generation, from year 1995 to year 2004 are analyzed. In the internal supply of primary energy in Mexico, the hydrocarbons represent 83%, the diversified sources (nuclear, geothermal, hydro and coal) represent 7% and the biomass as well as complementary coal, the 10% balance of the primary energy. Finally an expansion plan of the transmission network of the Mexican electrical system is described. [Spanish] Se presenta un analisis del mercado electrico mexicano en el ano de 1994 en cuanto a ventas de energia electrica y los tipos de usuarios que utilizaron esa energia. Se hace un analisis ademas, de las opciones para la oferta futura, donde se describe la capacidad electrica instalada de Mexico en 1994. Tambien se analizan los requerimientos de capacidad adicional de generacion de 1995 al 2004. En la oferta interna de energia primaria en Mexico, los hidrocarburos representan el 83%, las fuentes diversificadas (nuclear, geotermia, hidro y carboelectrica) representan el 7% y la biomasa asi como el carbon complementario, el 10% restante de la energia primaria. Finalmente se describe un plan de expansion de la red de transmision del sistema electrico mexicano.

  9. Planning model for hydraulic and thermic generation systems expansion under uncertainly conditions and financial restrictions; Modelo de planejamento da expansao de sistemas hidrotermicos sob incertezas e restricoes financeiras

    Energy Technology Data Exchange (ETDEWEB)

    Gorenstin, B.G.; Costa, J.P. da [CEPEL, Rio de Janeiro, RJ (Brazil); Pereira, M.V.F.; Campodonico, N.M.

    1993-12-31

    This issue presents a methodology for planning the systems expansion of hydraulic and thermic power generation associated considering several uncertainly factors, such as: demand growing, fuel costs, delays on the work construction, financial restrictions, etc. The solution focus is based on stock optimize techniques, decision analysis. This work is being developed by the Brazilian Electrical Centre (ELETROBRAS) and rely on the Energy Latin-American Organization (OLADE), Development Inter-American Bank (BID), World Bank (BIRD) and International Energy Agency (IAEA) support. An example case with Costa Rica system is also discussed 19 refs., 4 figs., 2 tabs.

  10. 216-B-3 expansion ponds closure plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This document describes the activities for clean closure under the Resource Conservation and Recovery Act of 1976 (RCRA) of the 216-B-3 Expansion Ponds. The 216-B-3 Expansion Ponds are operated by the US Department of Energy, Richland Operations Office (DOE-RL) and co-operated by Westinghouse Hanford Company (Westinghouse Hanford). The 216-B-3 Expansion Ponds consists of a series of three earthen, unlined, interconnected ponds that receive waste water from various 200 East Area operating facilities. The 3A, 3B, and 3C ponds are referred to as Expansion Ponds because they expanded the capability of the B Pond System. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the Bypass pipe (Project X-009). Water discharged to the Bypass pipe flows directly into the 216-B-3C Pond. The ponds were operated in a cascade mode, where the Main Pond overflowed into the 3A Pond and the 3A Pond overflowed into the 3C Pond. The 3B Pond has not received waste water since May 1985; however, when in operation, the 3B Pond received overflow from the 3A Pond. In the past, waste water discharges to the Expansion Ponds had the potential to have contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the dangerous waste portion of mixed waste is regulated under RCRA.

  11. 216-B-3 expansion ponds closure plan

    International Nuclear Information System (INIS)

    1994-10-01

    This document describes the activities for clean closure under the Resource Conservation and Recovery Act of 1976 (RCRA) of the 216-B-3 Expansion Ponds. The 216-B-3 Expansion Ponds are operated by the US Department of Energy, Richland Operations Office (DOE-RL) and co-operated by Westinghouse Hanford Company (Westinghouse Hanford). The 216-B-3 Expansion Ponds consists of a series of three earthen, unlined, interconnected ponds that receive waste water from various 200 East Area operating facilities. The 3A, 3B, and 3C ponds are referred to as Expansion Ponds because they expanded the capability of the B Pond System. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the Bypass pipe (Project X-009). Water discharged to the Bypass pipe flows directly into the 216-B-3C Pond. The ponds were operated in a cascade mode, where the Main Pond overflowed into the 3A Pond and the 3A Pond overflowed into the 3C Pond. The 3B Pond has not received waste water since May 1985; however, when in operation, the 3B Pond received overflow from the 3A Pond. In the past, waste water discharges to the Expansion Ponds had the potential to have contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the dangerous waste portion of mixed waste is regulated under RCRA

  12. Generation Expansion Planning Considering Integrating Large-scale Wind Generation

    DEFF Research Database (Denmark)

    Zhang, Chunyu; Ding, Yi; Østergaard, Jacob

    2013-01-01

    necessitated the inclusion of more innovative and sophisticated approaches in power system investment planning. A bi-level generation expansion planning approach considering large-scale wind generation was proposed in this paper. The first phase is investment decision, while the second phase is production...... optimization decision. A multi-objective PSO (MOPSO) algorithm was introduced to solve this optimization problem, which can accelerate the convergence and guarantee the diversity of Pareto-optimal front set as well. The feasibility and effectiveness of the proposed bi-level planning approach and the MOPSO...

  13. Generation capacity expansion planning in deregulated electricity markets

    Science.gov (United States)

    Sharma, Deepak

    With increasing demand of electric power in the context of deregulated electricity markets, a good strategic planning for the growth of the power system is critical for our tomorrow. There is a need to build new resources in the form of generation plants and transmission lines while considering the effects of these new resources on power system operations, market economics and the long-term dynamics of the economy. In deregulation, the exercise of generation planning has undergone a paradigm shift. The first stage of generation planning is now undertaken by the individual investors. These investors see investments in generation capacity as an increasing business opportunity because of the increasing market prices. Therefore, the main objective of such a planning exercise, carried out by individual investors, is typically that of long-term profit maximization. This thesis presents some modeling frameworks for generation capacity expansion planning applicable to independent investor firms in the context of power industry deregulation. These modeling frameworks include various technical and financing issues within the process of power system planning. The proposed modeling frameworks consider the long-term decision making process of investor firms, the discrete nature of generation capacity addition and incorporates transmission network modeling. Studies have been carried out to examine the impact of the optimal investment plans on transmission network loadings in the long-run by integrating the generation capacity expansion planning framework within a modified IEEE 30-bus transmission system network. The work assesses the importance of arriving at an optimal IRR at which the firm's profit maximization objective attains an extremum value. The mathematical model is further improved to incorporate binary variables while considering discrete unit sizes, and subsequently to include the detailed transmission network representation. The proposed models are novel in the

  14. Transmission Network Expansion Planning Considering Phase-Shifter Transformers

    Directory of Open Access Journals (Sweden)

    Celso T. Miasaki

    2012-01-01

    Full Text Available This paper presents a novel mathematical model for the transmission network expansion planning problem. Main idea is to consider phase-shifter (PS transformers as a new element of the transmission system expansion together with other traditional components such as transmission lines and conventional transformers. In this way, PS are added in order to redistribute active power flows in the system and, consequently, to diminish the total investment costs due to new transmission lines. Proposed mathematical model presents the structure of a mixed-integer nonlinear programming (MINLP problem and is based on the standard DC model. In this paper, there is also applied a specialized genetic algorithm aimed at optimizing the allocation of candidate components in the network. Results obtained from computational simulations carried out with IEEE-24 bus system show an outstanding performance of the proposed methodology and model, indicating the technical viability of using these nonconventional devices during the planning process.

  15. A multi-stage stochastic transmission expansion planning method

    International Nuclear Information System (INIS)

    Akbari, Tohid; Rahimikian, Ashkan; Kazemi, Ahad

    2011-01-01

    Highlights: → We model a multi-stage stochastic transmission expansion planning problem. → We include available transfer capability (ATC) in our model. → Involving this criterion will increase the ATC between source and sink points. → Power system reliability will be increased and more money can be saved. - Abstract: This paper presents a multi-stage stochastic model for short-term transmission expansion planning considering the available transfer capability (ATC). The ATC can have a huge impact on the power market outcomes and the power system reliability. The transmission expansion planning (TEP) studies deal with many uncertainties, such as system load uncertainties that are considered in this paper. The Monte Carlo simulation method has been applied for generating different scenarios. A scenario reduction technique is used for reducing the number of scenarios. The objective is to minimize the sum of investment costs (IC) and the expected operation costs (OC). The solution technique is based on the benders decomposition algorithm. The N-1 contingency analysis is also done for the TEP problem. The proposed model is applied to the IEEE 24 bus reliability test system and the results are efficient and promising.

  16. Expansion of discharge planning system in Japan: Comparison of results of a nationwide survey between 2001 and 2010

    Directory of Open Access Journals (Sweden)

    Nagata Satoko

    2012-08-01

    Full Text Available Abstract Background In response to the rapid aging of the population in Japan, many care systems have been created in quick succession. Establishment of discharge planning departments (DPDs in hospitals is one of them. In this study, we compared the distribution and characteristics of DPDs and the characteristics of the hospitals that have DPDs between 2001 and 2010 in Japan. Methods We mailed a questionnaire about the characteristics of hospitals and existence and situation of DPDs to all general hospitals with 100 or more general beds in 2001 and in 2010. Results In 2001, of the 3,268 hospitals queried, 1,568 (48.0% responded and 1,357 (41.5% were selected for data analysis. In 2010, among 2,600 hospitals, 940 hospitals (36.1% responded and 913 (35.1% met the inclusion criteria. The percentage of hospitals with DPDs increased from 30% to more than 70% between the two surveys. More departments were under the direct control of the hospital director and more physicians participated in discharge planning activities in 2010 than in 2001. In 2001, private hospitals and hospitals with an affiliated institution or agency tended to have a DPD; however, the relationship between these factors and the presence of a DPD had disappeared in 2010. Larger hospitals and hospitals with more nurses per patient tended to have a DPD both in 2001 and 2010. Conclusions Since 2008, the establishment of a DPD has been directly connected to medical fees so hospital administrators might have recognized the DPD as a “necessary and paid for” department. Having a DPD was the majority’s policy in Japan, and we must recognize the importance of quality assurance through DPDs from now on, especially in small hospitals.

  17. Temperature expansions for magnetic systems

    International Nuclear Information System (INIS)

    Cangemi, D.; Dunne, G.

    1996-01-01

    We derive finite temperature expansions for relativistic fermion systems in the presence of background magnetic fields, and with nonzero chemical potential. We use the imaginary-time formalism for the finite temperature effects, the proper-time method for the background field effects, and zeta function regularization for developing the expansions. We emphasize the essential difference between even and odd dimensions, focusing on 2+1 and 3+1 dimensions. We concentrate on the high temperature limit, but we also discuss the T=0 limit with nonzero chemical potential. Copyright copyright 1996 Academic Press, Inc

  18. Electric utility resource expansion planning using environmental externalities

    International Nuclear Information System (INIS)

    Mitchell, D.

    1992-01-01

    This paper describes the recent experience of San Diego Gas ampersand Electric Company using environmental externalities in the expansion planning of its electrical system. This is the first time that this method of planning has been used in the electric utility industry in California. The paper reviews the conceptual development of the monetary values for environmental externalities and shows how the application of these values modifies the resource selection process. This paper should be of interest to professionals involved in policy issues relating to the use of environmental externalities as a means to improve the environment. The experience gained through this analyses should also benefit electric utility personnel involved in planning, and regulators interested in planning

  19. Decenal plan of electric energy expansion - 2006-2015

    International Nuclear Information System (INIS)

    2006-01-01

    This report is divided into seven chapters and presents: 1) Introduction - a brief description of the institutional context of the study and the decenal planning role in this context; 2) electric power market - the evolution of market and economy conjuncture of electric power and the basic premises for the market projections, including the considered macroeconomic scenery description; 3) electric power generation - considered premises, methodology and criteria for the formulation and adjustment of generation expansion alternatives of electric power; 4) electric power transmission - main aspects which guided the evolution of the interlinked system reference configuration in the decenal period and a description of the main result of transmission system expansion analysis, consolidated by SIN geoelectric region and by each state of these regions; 5) socioenvironmental analysis - adopted methodology and the results of the socioenvironmental analysis for the foreseen business in the decenal horizon; 6) expansion indicators of the electric system - synthesizes the main indicators referring to the decenal period as far the market evolution, generation expansion and transmission is concerned; 7)bibliographic references

  20. Decenal plan of electric energy expansion - 2006-2015

    International Nuclear Information System (INIS)

    2005-01-01

    This report is divided into seven chapters and presents: 1) Introduction - a brief description of the institutional context of the study and the decenal planning role in this context; 2) electric power market - the evolution of market and economy conjuncture of electric power and the basic premises for the market projections, including the considered macroeconomic scenery description; 3) electric power generation - considered premises, methodology and criteria for the formulation and adjustment of generation expansion alternatives of electric power; 4) electric power transmission - main aspects which guided the evolution of the interlinked system reference configuration in the decenal period and a description of the main result of transmission system expansion analysis, consolidated by SIN geoelectric region and by each state of these regions; 5) socioenvironmental analysis - adopted methodology and the results of the socioenvironmental analysis for the foreseen business in the decenal horizon; 6) expansion indicators of the electric system - synthesizes the main indicators referring to the decenal period as far the market evolution, generation expansion and transmission is concerned; 7)bibliographic references

  1. Systemic Planning

    DEFF Research Database (Denmark)

    Leleur, Steen

    This book presents principles and methodology for planning in a complex world. It sets out a so-called systemic approach to planning, among other things, by applying “hard” and “soft” methodologies and methods in combination. The book is written for Ph.D and graduate students in engineering...

  2. Scalable and practical multi-objective distribution network expansion planning

    NARCIS (Netherlands)

    Luong, N.H.; Grond, M.O.W.; Poutré, La J.A.; Bosman, P.A.N.

    2015-01-01

    We formulate the distribution network expansion planning (DNEP) problem as a multi-objective optimization (MOO) problem with different objectives that distribution network operators (DNOs) would typically like to consider during decision making processes for expanding their networks. Objectives are

  3. British Gas plans global gas unit expansion

    International Nuclear Information System (INIS)

    Vielvoye, R.

    1991-01-01

    This paper reports on developing a global gas business, a British Gas plc's strategy for evolving a state owned U.K. gas company to a privatized worldwide oil and gas giant. By 2000, BG's global gas business is expected to provide 20% of its revenues, compared with 40% each from its exploration and production operations and its U.K. gas business. The global gas unit (GGU) plans to meet its targets mainly through acquiring holdings in gas transmission and distribution companies around the world. In the 12 months since GGU was established, it has made two such major acquisitions in this area. BG acquired Consumers Gas Co., Ltd., Ontario, Canada's biggest natural gas distribution company, for $943.5 million. It also took a 10% stake in Catalana de Gas SA, Barcelona, the largest privately owned gas utility in Spain and in terms of number of customers, the fourth largest in western Europe. BG also is targeting additional revenues from developing gas fired cogeneration systems in developing countries with gas reserves but no established transmission and distribution systems

  4. 2015 Plan. Project 1: methodology and planning process of the Brazilian electric sector expansion

    International Nuclear Information System (INIS)

    1993-10-01

    The Planning Process of Brazilian Electric Sector Expansion, their normative aspects, instruments, main agents and the planning cycles are described. The methodology of expansion planning is shown, with the interactions of several study areas, electric power market and the used computer models. The forecasts of methodology evolution is also presented. (C.G.C.)

  5. Market-based transmission expansion planning by improved differential evolution

    International Nuclear Information System (INIS)

    Georgilakis, Pavlos S.

    2010-01-01

    The restructuring and deregulation has exposed the transmission planner to new objectives and uncertainties. As a result, new criteria and approaches are needed for transmission expansion planning (TEP) in deregulated electricity markets. This paper proposes a new market-based approach for TEP. An improved differential evolution (IDE) model is proposed for the solution of this new market-based TEP problem. The modifications of IDE in comparison to the simple differential evolution method are: (1) the scaling factor F is varied randomly within some range, (2) an auxiliary set is employed to enhance the diversity of the population, (3) the newly generated trial vector is compared with the nearest parent, and (4) the simple feasibility rule is used to treat the constraints. Results from the application of the proposed method on the IEEE 30-bus test system demonstrate the feasibility and practicality of the proposed IDE for the solution of TEP problem. (author)

  6. Semiclassical expansions for confined N fermion systems

    International Nuclear Information System (INIS)

    Krivine, H.; Martorell, J.; Casas, M.

    1989-01-01

    A new derivation of the Wigner Kirkwood expansion for N-fermion systems is presented, showing explicitly the connection to the WKB approximation for a single level. This allows to study separately the two ansatz required to obtain the semiclassical expansions: the asymptotic expansions in powers of ℎ and the smoothing of quantal effects. We discuss the one dimensional and three dimensional, with spherical symmetry, cases. Applications for standard potentials used in nuclear physics are described in detail

  7. Optimum transmission system expansion offshore considering renewable energy sources

    NARCIS (Netherlands)

    Torbaghan, Shahab S.; Gibescu, Madeleine

    2017-01-01

    This chapter provides an overview of transmission expansion planning (TEP) methods and their practical application. First, it discusses the strategic importance of the transmission system. Next, it describes the reasons why TEP remains a challenge for systems with a large share of renewable energy.

  8. Banking towards development: Evidence from the Spanish banking expansion plan

    OpenAIRE

    Pere Arqué-Castells; Elisabet Viladecans-Marsal

    2013-01-01

    During the period 1965-1987 Spain was an emerging market in full transition from developing to developed status. During the same period the Spanish banking system underwent an unprecedented episode of expansion growing from 5,000 to over 30,000 bank branches. We examine whether the latter process partly caused the former by focusing on the relationship between branch expansion and entrepreneurship in the wholesale and retail trade industries. To address the non-random allocation of bank branc...

  9. Cost estimation of sumatra electricity expansion planning with nuclear option

    International Nuclear Information System (INIS)

    Edwaren Liun

    2008-01-01

    The objective of the study is to obtain the cost analysis on optimum solution of Sumatra electricity system using WASP-IV Program. Considering the economic aspect, nuclear power plant (NPP) is feasible in the future. From the geographical aspect Sumatra is prospecting for NPP site, especially the east coastal area due to the absence of hydro power potential and geothermal field. The use of petroleum as fuel in large scale power plants is not feasible. Beside causing high cost for electricity sector, it is also an important fuel for any other sectors such as transportation, electrification of isolated areas. Gas fuelled power plants is still feasible for next several decades in limited capacity. The study presents three scenarios, i.e. Low Scenario, Base Scenario and High Scenario applying discount rate of 8%, 10% and 12% respectively. Cost estimation for Sumatra System Expansion Planning is 57 465 million US$ on the Base Scenario - discount rate 8%, 59 349 million US$ on the Base Scenario - discount rate 10%, and 57 796 million US$ on the Base Scenario - discount rate 12%. The objective function is 15 172 US$ on the Base Scenario - discount rate 8%, 12 663 million US$ on the Base Scenario - discount rate 10%, and 11 017 million US$ on the Base Scenario - discount rate 12%. (author)

  10. Multi types DG expansion dynamic planning in distribution system under stochastic conditions using Covariance Matrix Adaptation Evolutionary Strategy and Monte-Carlo simulation

    International Nuclear Information System (INIS)

    Sadeghi, Mahmood; Kalantar, Mohsen

    2014-01-01

    Highlights: • Defining a DG dynamic planning problem. • Applying a new evolutionary algorithm called “CMAES” in planning process. • Considering electricity price and fuel price variation stochastic conditions. • Scenario generation and reduction with MCS and backward reduction programs. • Considering approximately all of the costs of the distribution system. - Abstract: This paper presents a dynamic DG planning problem considering uncertainties related to the intermittent nature of the DG technologies such as wind turbines and solar units in addition to the stochastic economic conditions. The stochastic economic situation includes the uncertainties related to the fuel and electricity price of each year. The Monte Carlo simulation is used to generate the possible scenarios of uncertain situations and the produced scenarios are reduced through backward reduction program. The aim of this paper is to maximize the revenue of the distribution system through the benefit cost analysis alongside the encouraging and punishment functions. In order to close to reality, the different growth rates for the planning period are selected. In this paper the Covariance Matrix Adaptation Evolutionary Strategy is introduced and is used to find the best planning scheme of the DG units. The different DG types are considered in the planning problem. The main assumption of this paper is that the DISCO is the owner of the distribution system and the DG units. The proposed method is tested on a 9 bus test distribution system and the results are compared with the known genetic algorithm and PSO methods to show the applicability of the CMAES method in this problem

  11. On a generalized oscillator system: interbasis expansions

    Energy Technology Data Exchange (ETDEWEB)

    Kibler, M [Lyon-1 Univ., 69 - Villeurbanne (France). Inst. de Physique Nucleaire; Mardoyan, L G; Pogosyan, G S [Joint Inst. for Nuclear Research, Dubna (Russian Federation). Lab. of Theoretical Physics

    1997-12-31

    This article deals with a nonrelativistic quantum mechanical study of a dynamical system which generalizes the isotropic harmonic oscillator system in three dimensions. The Schroedinger equation for this generalized oscillator system is separable in spherical, cylindrical, and spheroidal (prolate and oblate) coordinates. The quantum mechanical spectrum of this system is worked out in some details. The problem of interbasis expansions of the wave functions is completely solved. The coefficients for the expansion of the cylindrical basis in terms of the spherical basis, and vice-versa, are found to be analytic continuations (to real values of their arguments) of Clebsch-Gordan coefficients for the group SU(2). The interbasis expansion coefficients for the prolate and oblate spheroidal bases in terms of the spherical or the cylindrical bases are shown to satisfy three-term recursion relations. Finally, a connection between the generalized oscillator system (projected on the z-line) and the Morse system (in one dimension) are discussed. 41 refs.,.

  12. On a generalized oscillator system: interbasis expansions

    International Nuclear Information System (INIS)

    Kibler, M.; Mardoyan, L.G.; Pogosyan, G.S.

    1996-01-01

    This article deals with a nonrelativistic quantum mechanical study of a dynamical system which generalizes the isotropic harmonic oscillator system in three dimensions. The Schroedinger equation for this generalized oscillator system is separable in spherical, cylindrical, and spheroidal (prolate and oblate) coordinates. The quantum mechanical spectrum of this system is worked out in some details. The problem of interbasis expansions of the wave functions is completely solved. The coefficients for the expansion of the cylindrical basis in terms of the spherical basis, and vice-versa, are found to be analytic continuations (to real values of their arguments) of Clebsch-Gordan coefficients for the group SU(2). The interbasis expansion coefficients for the prolate and oblate spheroidal bases in terms of the spherical or the cylindrical bases are shown to satisfy three-term recursion relations. Finally, a connection between the generalized oscillator system (projected on the z-line) and the Morse system (in one dimension) are discussed. 41 refs.,

  13. Leader-Follower Approach to Gas-Electricity Expansion Planning Problem

    DEFF Research Database (Denmark)

    Khaligh, Vahid; Oloomi Buygi, Majid; Anvari-Moghaddam, Amjad

    2018-01-01

    investment in capacity addition to the generation and transmission levels while considers the limitations on fuel consumption. On the other hand gas operator decides about investment in gas pipelines expansions considering the demanded gas by the electricity network. In this planning model for a joint gas......The main purpose of this paper is to develop a method for sequential gas and electricity networks expansion planning problem. A leader-follower approach performs the expansion planning of the joint gas and electricity networks. Electric system operator under adequacy incentive decides about......-electricity network, supply and demand are matched together while adequacy of fuel for gas consuming units is also guaranteed. To illustrate the effectiveness of the proposed method Khorasan province of Iran is considered as a case study which has a high penetration level of gas-fired power plants (GFPP). Also...

  14. A multi-objective framework for dynamic transmission expansion planning in competitive electricity market

    International Nuclear Information System (INIS)

    Foroud, Asghar Akbari; Abdoos, Ali Akbar; Keypour, Reza; Amirahmadi, Meisam

    2010-01-01

    Restructuring of power system has changed the traditional planning objectives and introduced challenges in the field of Transmission Expansion Planning (TEP). Due to these changes, new approaches and criteria are needed for transmission planning in deregulated environment. Therefore, in this paper, a dynamic expansion methodology is presented using a multi-objective optimization framework. Investment cost, congestion cost and reliability are considered in the optimization as three objectives. To overcome the difficulties in solving the non-convex and mixed integer nature of the optimization problems, a Non-Dominated Sorting Genetic Algorithm (NSGA II) approach is used followed by a fuzzy decision making analysis to obtain the final optimal solution. The planning methodology has been demonstrated on the IEEE 24-bus test system and north-east of Iran national 400 kV transmission grid to show the feasibility and capabilities of the proposed algorithm in electricity market environment. (author)

  15. Multi-period multi-objective electricity generation expansion planning problem with Monte-Carlo simulation

    Energy Technology Data Exchange (ETDEWEB)

    Tekiner, Hatice [Industrial Engineering, College of Engineering and Natural Sciences, Istanbul Sehir University, 2 Ahmet Bayman Rd, Istanbul (Turkey); Coit, David W. [Department of Industrial and Systems Engineering, Rutgers University, 96 Frelinghuysen Rd., Piscataway, NJ (United States); Felder, Frank A. [Edward J. Bloustein School of Planning and Public Policy, Rutgers University, Piscataway, NJ (United States)

    2010-12-15

    A new approach to the electricity generation expansion problem is proposed to minimize simultaneously multiple objectives, such as cost and air emissions, including CO{sub 2} and NO{sub x}, over a long term planning horizon. In this problem, system expansion decisions are made to select the type of power generation, such as coal, nuclear, wind, etc., where the new generation asset should be located, and at which time period expansion should take place. We are able to find a Pareto front for the multi-objective generation expansion planning problem that explicitly considers availability of the system components over the planning horizon and operational dispatching decisions. Monte-Carlo simulation is used to generate numerous scenarios based on the component availabilities and anticipated demand for energy. The problem is then formulated as a mixed integer linear program, and optimal solutions are found based on the simulated scenarios with a combined objective function considering the multiple problem objectives. The different objectives are combined using dimensionless weights and a Pareto front can be determined by varying these weights. The mathematical model is demonstrated on an example problem with interesting results indicating how expansion decisions vary depending on whether minimizing cost or minimizing greenhouse gas emissions or pollutants is given higher priority. (author)

  16. Wien Automatic System Package (WASP). A computer code for power generating system expansion planning. Version WASP-III Plus. User's manual. Volume 2: Appendices

    International Nuclear Information System (INIS)

    1995-01-01

    With several Member States, the IAEA has completed a new version of the WASP program, which has been called WASP-Ill Plus since it follows quite closely the methodology of the WASP-Ill model. The major enhancements in WASP-Ill Plus with respect to the WASP-Ill version are: increase in the number of thermal fuel types (from 5 to 10); verification of which configurations generated by CONGEN have already been simulated in previous iterations with MERSIM; direct calculation of combined Loading Order of FIXSYS and VARSYS plants; simulation of system operation includes consideration of physical constraints imposed on some fuel types (i.e., fuel availability for electricity generation); extended output of the resimulation of the optimal solution; generation of a file that can be used for graphical representation of the results of the resimulation of the optimal solution and cash flows of the investment costs; calculation of cash flows allows to include the capital costs of plants firmly committed or in construction (FIXSYS plants); user control of the distribution of capital cost expenditures during the construction period (if required to be different from the general 'S' curve distribution used as default). This second volume of the document to support use of the WASP-Ill Plus computer code consists of 5 appendices giving some additional information about the WASP-Ill Plus program. Appendix A is mainly addressed to the WASP-Ill Plus system analyst and supplies some information which could help in the implementation of the program on the user computer facilities. This appendix also includes some aspects about WASP-Ill Plus that could not be treated in detail in Chapters 1 to 11. Appendix B identifies all error and warning messages that may appear in the WASP printouts and advises the user how to overcome the problem. Appendix C presents the flow charts of the programs along with a brief description of the objectives and structure of each module. Appendix D describes the

  17. Techno-economic and environmental analysis of power generation expansion plan of Ghana

    International Nuclear Information System (INIS)

    Awopone, Albert K.; Zobaa, Ahmed F.; Banuenumah, Walter

    2017-01-01

    This paper examines the current electrical generation expansion plan of Ghana and compares it with proposed expansion pathways with higher penetration of Renewable Energy Technologies. An adaptation of Schwartz's Scenario Methodology was used to develop the scenarios which were then analysed using the Long-range Alternatives Planning (LEAP) model. Each of the scenarios represents policy options for generation expansion in Ghana up to 2040. Energy, economic and environmental analysis of the three alternative scenarios compared to the base scenarios was undertaken. Sensitivity results show that, if the country were to follow the generation expansion path described in the renewable energy scenarios, it could reap economic benefits of 0.5–13.23% depending on the developments in fuel prices and renewable technology capital cost. The analysis further quantifies benefits to be derived from a reduction in Greenhouse gases of the scenarios. Policy implications for the generation system of Ghana based on the results are also discussed. - Highlights: • LEAP demand projection for Ghana from 2010 to 2014. • Develop scenarios using an adaptation of Schwartz’s scenario approach. • Develop LEAP model for generation scenario. • Each scenario represents possible generation expansion strategy. • High renewable energy systems penetration results in net economic and environmental benefits.

  18. Impact of equipment failures and wind correlation on generation expansion planning

    DEFF Research Database (Denmark)

    Pineda, S.; Morales, J.M.; Ding, Y.

    2014-01-01

    the generating company (GENCO) and the system operator. The upper-level problem maximizes the GENCO's expected profit, while the lower-level problem simulates an hourly market-clearing procedure, through which LMPs are determined. The uncertainty pertaining to failures and wind power correlation is characterized......Generation expansion planning has become a complex problem within a deregulated electricity market environment due to all the uncertainties affecting the profitability of a given investment. Current expansion models usually overlook some of these uncertainties in order to reduce the computational...

  19. Three-dimensional photogrammetry for surgical planning of tissue expansion in hemifacial microsomia.

    Science.gov (United States)

    Jayaratne, Yasas S N; Lo, John; Zwahlen, Roger A; Cheung, Lim K

    2010-12-01

    We aim to illustrate the applications of 3-dimensional (3-D) photogrammetry for surgical planning and longitudinal assessment of the volumetric changes in hemifacial microsomia. A 3-D photogrammetric system was employed for planning soft tissue expansion and transplantation of a vascularized scapular flap for a patient with hemifacial microsomia. The facial deficiency was calculated by superimposing a mirror of the normal side on the preoperative image. Postsurgical volumetric changes were monitored by serial superimposition of 3-D images. A total of 31 cm(3) of tissue expansion was achieved within a period of 4 weeks. A scapular free flap measuring 8 cm × 5 cm was transplanted to augment the facial deficiency. Postsurgical shrinkage of the flap was observed mainly in the first 3 months and it was minimal thereafter. 3-D photogrammetry can be used as a noninvasive objective tool for assessing facial deformity, planning, and postoperative follow-up of surgical correction of facial asymmetry.

  20. Technical and economic evaluation of voltage level in transmission network expansion planning using GA

    International Nuclear Information System (INIS)

    Jalilzadeh, S.; Kazemi, A.; Shayeghi, H.; Madavi, M.

    2008-01-01

    Transmission network expansion planning is an important part of power system planning. Its task is to determine an optimal network configuration according to load growth. It determines where, when and how many new transmission lines should be installed. Up to now, various methods have been presented to solve the static transmission network expansion planning (STNEP) problem, but in all of these methods, the STNEP problem has been solved regardless of voltage level of the lines. In this paper, due to different voltage levels in the transmission network, which cause different annual losses, STNEP has been studied considering the voltage level of the transmission lines and the network loss using the genetic algorithm (GA). Finally, the proposed idea has been examined on Garvers 6 bus network. The results show that considering the loss in a network with different voltage levels decreases the operational costs considerably, and the network satisfies the requirement of delivering electric power more safely and reliably to load centers

  1. Energy efficiency resource modeling in generation expansion planning

    International Nuclear Information System (INIS)

    Ghaderi, A.; Parsa Moghaddam, M.; Sheikh-El-Eslami, M.K.

    2014-01-01

    Energy efficiency plays an important role in mitigating energy security risks and emission problems. In this paper, energy efficiency resources are modeled as efficiency power plants (EPP) to evaluate their impacts on generation expansion planning (GEP). The supply curve of EPP is proposed using the production function of electricity consumption. A decision making framework is also presented to include EPP in GEP problem from an investor's point of view. The revenue of EPP investor is obtained from energy cost reduction of consumers and does not earn any income from electricity market. In each stage of GEP, a bi-level model for operation problem is suggested: the upper-level represents profit maximization of EPP investor and the lower-level corresponds to maximize the social welfare. To solve the bi-level problem, a fixed-point iteration algorithm is used known as diagonalization method. Energy efficiency feed-in tariff is investigated as a regulatory support scheme to encourage the investor. Results pertaining to a case study are simulated and discussed. - Highlights: • An economic model for energy efficiency programs is presented. • A framework is provided to model energy efficiency resources in GEP problem. • FIT is investigated as a regulatory support scheme to encourage the EPP investor. • The capacity expansion is delayed and reduced with considering EPP in GEP. • FIT-II can more effectively increase the energy saving compared to FIT-I

  2. Generation Expansion Planning as Particle Swarm Optimization with Gridified SATyrus

    International Nuclear Information System (INIS)

    Diacovo, R.; Franca, F. M. G.; Lima, P. M. V.

    2007-01-01

    This work introduces our first attempt on using the Grid to solve a real-life problem with the SATyrus platform. In electrical engineering, a challenging task is to find the less expensive ways to expand the energy production capacity, supporting an increasing demand. This is the definition of the generation expansion planning problem (GEP). We decided to investigate the Particle Swarm Optimization (PSO) paradigm for this task, due to its efficiency and arbitrary memory requirements, the last one being a desirable characteristic for any solver running on a Grid environment. The PSO was used in conjunction with the SATyrus platform, which stands for an energy function synthesizer. We hope the results presented here will help to evolve SATyrus into a reliable generic problem solver. (Author)

  3. Integrated multiperiod power generation and transmission expansion planning with sustainability aspects in a stochastic environment

    International Nuclear Information System (INIS)

    Seddighi, Amir Hossein; Ahmadi-Javid, Amir

    2015-01-01

    This paper presents a multistage stochastic programming model to address sustainable power generation and transmission expansion planning. The model incorporates uncertainties about future electricity demand, fuel prices, greenhouse gas emissions, as well as possible disruptions to which the power system is subject. A number of sustainability regulations and policies are considered to establish a framework for the social responsibility of the power system. The proposed model is applied to a real-world case, and several sensitivity analyses are carried out to provide managerial insights into different aspects of the model. The results emphasize the important role played by sustainability policies on the configuration of the power grid. - Highlights: • This paper considers integrated power generation and transmission expansion planning. • Sustainability aspects are incorporated into a multiperiod stochastic setting. • A stochastic mathematical programming model is developed to address the problem. • The model is applied to a real-world case and numerical studies are carried out

  4. AC transmission network expansion planning considering circuits repowering and location of capacitors

    OpenAIRE

    Jaime A. López-López; Diego A. Tejada-Arango; Jesús M. López-Lezama

    2016-01-01

    This paper deals with the Transmission Network Expansion Planning (TNEP) problem. The TNEP consists of finding a set of new circuits on a power system, which is needed to attend a future demand. In its classical version, the TNEP only considers as solution candidates the addition of new lines and transformers. The main contribution of this paper consists in the inclusion of nonconventional solution candidates, namely the repowering of existing circuits and the location of capacitor banks. To ...

  5. A fuzzy approach to the generation expansion planning problem in a multi-objective environment

    International Nuclear Information System (INIS)

    Abass, S. A.; Massoud, E. M. A.; Abass, S. A.)

    2007-01-01

    In many power system problems, the use of optimization techniques has proved inductive to reducing the costs and losses of the system. A fuzzy multi-objective decision is used for solving power system problems. One of the most important issues in the field of power system engineering is the generation expansion planning problem. In this paper, we use the concepts of membership functions to define a fuzzy decision model for generating an optimal solution for this problem. Solutions obtained by the fuzzy decision theory are always efficient and constitute the best compromise. (author)

  6. Transmission network expansion planning based on hybridization model of neural networks and harmony search algorithm

    Directory of Open Access Journals (Sweden)

    Mohammad Taghi Ameli

    2012-01-01

    Full Text Available Transmission Network Expansion Planning (TNEP is a basic part of power network planning that determines where, when and how many new transmission lines should be added to the network. So, the TNEP is an optimization problem in which the expansion purposes are optimized. Artificial Intelligence (AI tools such as Genetic Algorithm (GA, Simulated Annealing (SA, Tabu Search (TS and Artificial Neural Networks (ANNs are methods used for solving the TNEP problem. Today, by using the hybridization models of AI tools, we can solve the TNEP problem for large-scale systems, which shows the effectiveness of utilizing such models. In this paper, a new approach to the hybridization model of Probabilistic Neural Networks (PNNs and Harmony Search Algorithm (HSA was used to solve the TNEP problem. Finally, by considering the uncertain role of the load based on a scenario technique, this proposed model was tested on the Garver’s 6-bus network.

  7. Nuclear plants in the expansion of the Mexican electrical system

    International Nuclear Information System (INIS)

    Estrada S, G. J.; Martin del Campo M, C.

    2009-10-01

    In this work the results of four studies appear that were realized to analyze plans of long term expansion of Mexican electrical system of generation for the study period 2005-2025. The objective is to identify between the two third generation reactors with greater maturity at present which is it is that it can be integrated better in the expansion of the Mexican electrical system of generation. It was analyzed which of the four cases represents the best expansion plan in terms of two only parameters that are: 1) total cost of generation and, 2) the diversity of generated energy in all the period. In all studies candidates three different units of combined cycle were considered (802, 583 and 291 MW), a turbo gas unit of 267 MW, units of 700 MW with coal base and integrated de sulphur, geo thermo electrical units of 26.95 MW and two different types of nuclear units. In both first studies the Advanced Boiling Water Reactor (A BWR) for the nuclear units is considered, considering that is technology with more maturity of all the third generation reactors. In the following two studies were considered the European Pressurized Reactor (EPR), also of third generation, that uses in essence technology more spread to world-wide level. For this task was used the uni nodal planning model WASP-IV, developed by the IAEA to find the expansion configuration with less generation cost for each study. Considering the present situation of the generation system, the capacity additions begin starting from the year 2012 for the four studies. It is not considered the installation of nuclear plants before 2016 considering that its planning period takes 3 years, and the construction period requires at least of 5 years. In order to evaluate the diversity of each study it was used the Stirling Index or of Shannon-Weiner. In order to classify the studies in cost terms and diversity it was used like decision tool the Savage criterion, called also of minimal repentance. With this data, taking

  8. Public participation in planning procedures for the expansion of extra-high voltage transmission systems under the Energy Economy Law and the Law for Accelerated Network Expansion for Transmission Systems; Buergerbeteiligung in den Planungsverfahren zum Hoechstspannungsnetzausbau nach EnWG und NABEG

    Energy Technology Data Exchange (ETDEWEB)

    Weingarten, Elke; Peters, Wolfgang [Bosch and Partner GmbH, Berlin (Germany); Mueller-Pfannenstiel, Klaus [Bosch and Partner GmbH, Herne (Germany)

    2013-05-15

    The energy turnaround necessitates an expansion of the existing power transmission grid on a large scale and within a very short time frame. These measures will in all probability not be realisable without incurring conflicts with citizens affected by them. The topic of public participation should therefore be given very high priority from the very beginning of grid construction planning by systematically providing opportunities for citizens as representatives of the public at large to participate in decision making processes.

  9. Expansion planning of brazilian electric sector: institutional changes, new policies and new instruments for planning

    International Nuclear Information System (INIS)

    Bajay, S.V.; Silva, W.A. da; Ricciulli, D.L.S.

    1990-01-01

    The Brazilian power supply industry has been in crisis for many years, particularly due to financial and institutional problems. There are many reasons for that, several of them from outside the industry. In this paper a diagnosis of the main elements of this crisis is worked out, in the context of the industry's expansion planning. Following, institutional changes, new policies and new instruments are proposed for this planning. The institutional setting, the demand studies, the demand side management, the supply optimisation, the rural electrification, the decentralized generation of electricity, the tariff structure, the ways of financing the industry, the technological advances, the social and environmental impacts and the integrated planning of the industry are discussed, together with the planning of the power supply industry interactions with the other energy supply industries and the rest of the economy. (author)

  10. Reliability constrained generation expansion planning with consideration of wind farms uncertainties in deregulated electricity market

    International Nuclear Information System (INIS)

    Hemmati, Reza; Hooshmand, Rahmat-Allah; Khodabakhshian, Amin

    2013-01-01

    Highlights: • Generation expansion planning is presented in deregulated electricity market. • Wind farm uncertainty is modeled in the problem. • The profit of each GENCO is maximized and also the safe operation of system is satisfied. • Salve sector is managed as an optimization programming and solved by using PSO technique. • Master sector is considered in pool market and Cournot model is used to simulate it. - Abstract: This paper addresses reliability constrained generation expansion planning (GEP) in the presence of wind farm uncertainty in deregulated electricity market. The proposed GEP aims at maximizing the expected profit of all generation companies (GENCOs), while considering security and reliability constraints such as reserve margin and loss of load expectation (LOLE). Wind farm uncertainty is also considered in the planning and GENCOs denote their planning in the presence of wind farm uncertainty. The uncertainty is modeled by probability distribution function (PDF) and Monte-Carlo simulation (MCS) is used to insert uncertainty into the problem. The proposed GEP is a constrained, nonlinear, mixed-integer optimization programming and solved by using particle swarm optimization (PSO) method. In this paper, Electricity market structure is modeled as a pool market. Simulation results verify the effectiveness and validity of the proposed planning for maximizing GENCOs profit in the presence of wind farms uncertainties in electricity market

  11. AC transmission network expansion planning considering circuits repowering and location of capacitors

    Directory of Open Access Journals (Sweden)

    Jaime A. López-López

    2016-07-01

    Full Text Available This paper deals with the Transmission Network Expansion Planning (TNEP problem. The TNEP consists of finding a set of new circuits on a power system, which is needed to attend a future demand. In its classical version, the TNEP only considers as solution candidates the addition of new lines and transformers. The main contribution of this paper consists in the inclusion of nonconventional solution candidates, namely the repowering of existing circuits and the location of capacitor banks. To take into account these last ones an AC model of the transmission network is considered. The solution of the proposed model is carried out using a Hybrid Genetic Algorithm. Results are compared and validated with previous works in the technical literature. The test systems used are the Garver system and IEEE 24 bus system. The results obtained in both systems showed that the inclusion of the non-conventional candidates, proposed in this paper, allows to reduce the cost of network expansion. This fact may be useful as an indicator for the system planner to consider new possibilities in the expansion studies.

  12. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  13. Multi-criteria Generation-Expansion Planning with Carbon dioxide emissions and Nuclear Safety considerations

    International Nuclear Information System (INIS)

    Lee, Hun Gyu; Kim, Young Chang

    2010-01-01

    A multiple criteria decision making (MCDM) method is developed to aid decision makers in Generation Expansion planning and management. Traditionally, the prime objective of an electric utility's generation-expansion planning has been to determine the minimum cost supply plans that meet expected demands over a planning horizon (typically 10 to 30 years). Today, however, the nature of decision environments has changed substantially. Increased policy attention is given to solve the multiple tradeoff function including environmental and social factors as well as economic one related to nuclear power expansion. In order to deal with this MCDM problem, the Analytic Hierarchy Process (AHP) Model is applied

  14. Grid Transmission Expansion Planning Model Based on Grid Vulnerability

    Science.gov (United States)

    Tang, Quan; Wang, Xi; Li, Ting; Zhang, Quanming; Zhang, Hongli; Li, Huaqiang

    2018-03-01

    Based on grid vulnerability and uniformity theory, proposed global network structure and state vulnerability factor model used to measure different grid models. established a multi-objective power grid planning model which considering the global power network vulnerability, economy and grid security constraint. Using improved chaos crossover and mutation genetic algorithm to optimize the optimal plan. For the problem of multi-objective optimization, dimension is not uniform, the weight is not easy given. Using principal component analysis (PCA) method to comprehensive assessment of the population every generation, make the results more objective and credible assessment. the feasibility and effectiveness of the proposed model are validated by simulation results of Garver-6 bus system and Garver-18 bus.

  15. A new evolutionary solution method for dynamic expansion planning of DG-integrated primary distribution networks

    International Nuclear Information System (INIS)

    Ahmadigorji, Masoud; Amjady, Nima

    2014-01-01

    Highlights: • A new dynamic distribution network expansion planning model is presented. • A Binary Enhanced Particle Swarm Optimization (BEPSO) algorithm is proposed. • A Modified Differential Evolution (MDE) algorithm is proposed. • A new bi-level optimization approach composed of BEPSO and MDE is presented. • The effectiveness of the proposed optimization approach is extensively illustrated. - Abstract: Reconstruction in the power system and appearing of new technologies for generation capacity of electrical energy has led to significant innovation in Distribution Network Expansion Planning (DNEP). Distributed Generation (DG) includes the application of small/medium generation units located in power distribution networks and/or near the load centers. Appropriate utilization of DG can affect the various technical and operational indices of the distribution network such as the feeder loading, energy losses and voltage profile. In addition, application of DG in proper size is an essential tool to achieve the DG maximum potential benefits. In this paper, a time-based (dynamic) model for DNEP is proposed to determine the optimal size, location and installation year of DG in distribution system. Also, in this model, the Optimal Power Flow (OPF) is exerted to determine the optimal generation of DGs for every potential solution in order to minimize the investment and operation costs following the load growth in a specified planning period. Besides, the reinforcement requirements of existing distribution feeders are considered, simultaneously. The proposed optimization problem is solved by the combination of evolutionary methods of a new Binary Enhanced Particle Swarm Optimization (BEPSO) and Modified Differential Evolution (MDE) to find the optimal expansion strategy and solve OPF, respectively. The proposed planning approach is applied to two typical primary distribution networks and compared with several other methods. These comparisons illustrate the

  16. Planning for information systems

    CERN Document Server

    King, William R

    2015-01-01

    Edited by one of the best-known and most widely respected figures in the field, ""Planning for Information Systems"" is a comprehensive, single source overview of the myriad ideas and processes that are identified with IS planning. While many chapters deal with high level strategic planning, the book gives equal attention to on-the-ground planning issues.Part I, 'Key Concepts of IS Planning', focuses on how IS planning has evolved over the years; business-IS strategic alignment; and the role of dynamic organizational capabilities in leveraging IS competencies. Part II, 'The Organizational IS P

  17. Development of a regional capacity expansion plan in the Russian Federation. Application of the WASP Model

    International Nuclear Information System (INIS)

    Chernilin, Yu.; Kononov, S.; Zakharova, E.; Kagramanyan, V.; Malenkov, A.

    1997-01-01

    The Wien Automatic System Planning Package (WASP) is used for the development of optimal capacity expansion plans in Russia. The object of the WASP study is the Central power pool, which is the largest power pool in Russia and has an essential share of nuclear power in electricity generation. The objective of the study is to assess the long-term competitiveness of nuclear power in the region. The major features of the power system analyzed with WASP are the following: 1) four types of electricity generators are considered: condensity fossil fuel plants, cogeneration fossil fuel plants, nuclear power plants and hydraulic plants; 2) nine fuel categories are considered: gas/fuel oil fuel, several types of coal and several nuclear fuels; 3) escalation of capital, operation and maintenance, and fuel costs as a result of economic transition is explicitly modeled. Under these assumptions, a regional optimal capacity expansion plan is developed that showed the following: (a) Until 2004 there is no need for new electricity generation capacities due to the drop in demand in the 90s, certain lifetime margin of existing capacities, committed additions of co-generators and planned refurbishment/repowering measures; (b) The structure of the optimal capacity mix confirms that nuclear power can retain its role as one of the major electricity generation sources in the region. The most important factor with a positive of effect upon the competitiveness of nuclear power plants is the projected escalation of the prices of fossil fuels; (c) The application of WASP has proved that the model can serve as a valuable planning tool at the power pool level in Russia. (author). 14 refs, 8 figs, 10 tabs

  18. Development of a regional capacity expansion plan in the Russian Federation. Application of the WASP Model

    Energy Technology Data Exchange (ETDEWEB)

    Chernilin, Yu; Kononov, S; Zakharova, E [Russian Research Inst. ` ` Kurchatov Inst.` ` , Moscow (Russian Federation); Kagramanyan, V; Malenkov, A [Institute of Physics and Power Engineering, Obninsk (Russian Federation)

    1997-09-01

    The Wien Automatic System Planning Package (WASP) is used for the development of optimal capacity expansion plans in Russia. The object of the WASP study is the Central power pool, which is the largest power pool in Russia and has an essential share of nuclear power in electricity generation. The objective of the study is to assess the long-term competitiveness of nuclear power in the region. The major features of the power system analyzed with WASP are the following: 1) four types of electricity generators are considered: condensity fossil fuel plants, cogeneration fossil fuel plants, nuclear power plants and hydraulic plants; 2) nine fuel categories are considered: gas/fuel oil fuel, several types of coal and several nuclear fuels; 3) escalation of capital, operation and maintenance, and fuel costs as a result of economic transition is explicitly modeled. Under these assumptions, a regional optimal capacity expansion plan is developed that showed the following: (a) Until 2004 there is no need for new electricity generation capacities due to the drop in demand in the 90s, certain lifetime margin of existing capacities, committed additions of co-generators and planned refurbishment/repowering measures; (b) The structure of the optimal capacity mix confirms that nuclear power can retain its role as one of the major electricity generation sources in the region. The most important factor with a positive of effect upon the competitiveness of nuclear power plants is the projected escalation of the prices of fossil fuels; (c) The application of WASP has proved that the model can serve as a valuable planning tool at the power pool level in Russia. (author). 14 refs, 8 figs, 10 tabs.

  19. APPLICATION OF RESTART COVARIANCE MATRIX ADAPTATION EVOLUTION STRATEGY (RCMA-ES TO GENERATION EXPANSION PLANNING PROBLEM

    Directory of Open Access Journals (Sweden)

    K. Karthikeyan

    2012-10-01

    Full Text Available This paper describes the application of an evolutionary algorithm, Restart Covariance Matrix Adaptation Evolution Strategy (RCMA-ES to the Generation Expansion Planning (GEP problem. RCMA-ES is a class of continuous Evolutionary Algorithm (EA derived from the concept of self-adaptation in evolution strategies, which adapts the covariance matrix of a multivariate normal search distribution. The original GEP problem is modified by incorporating Virtual Mapping Procedure (VMP. The GEP problem of a synthetic test systems for 6-year, 14-year and 24-year planning horizons having five types of candidate units is considered. Two different constraint-handling methods are incorporated and impact of each method has been compared. In addition, comparison and validation has also made with dynamic programming method.

  20. NSGA-II algorithm for multi-objective generation expansion planning problem

    Energy Technology Data Exchange (ETDEWEB)

    Murugan, P.; Kannan, S. [Electronics and Communication Engineering Department, Arulmigu Kalasalingam College of Engineering, Krishnankoil 626190, Tamilnadu (India); Baskar, S. [Electrical Engineering Department, Thiagarajar College of Engineering, Madurai 625015, Tamilnadu (India)

    2009-04-15

    This paper presents an application of Elitist Non-dominated Sorting Genetic Algorithm version II (NSGA-II), to multi-objective generation expansion planning (GEP) problem. The GEP problem is considered as a two-objective problem. The first objective is the minimization of investment cost and the second objective is the minimization of outage cost (or maximization of reliability). To improve the performance of NSGA-II, two modifications are proposed. One modification is incorporation of Virtual Mapping Procedure (VMP), and the other is introduction of controlled elitism in NSGA-II. A synthetic test system having 5 types of candidate units is considered here for GEP for a 6-year planning horizon. The effectiveness of the proposed modifications is illustrated in detail. (author)

  1. Flexible Multi-Objective Transmission Expansion Planning with Adjustable Risk Aversion

    Directory of Open Access Journals (Sweden)

    Jing Qiu

    2017-07-01

    Full Text Available This paper presents a multi-objective transmission expansion planning (TEP framework. Rather than using the conventional deterministic reliability criterion, a risk component based on the probabilistic reliability criterion is incorporated into the TEP objectives. This risk component can capture the stochastic nature of power systems, such as load and wind power output variations, component availability, and incentive-based demand response (IBDR costs. Specifically, the formulation of risk value after risk aversion is explicitly given, and it aims to provide network planners with the flexibility to conduct risk analysis. Thus, a final expansion plan can be selected according to individual risk preferences. Moreover, the economic value of IBDR is modeled and integrated into the cost objective. In addition, a relatively new multi-objective evolutionary algorithm called the MOEA/D is introduced and employed to find Pareto optimal solutions, and tradeoffs between overall cost and risk are provided. The proposed approach is numerically verified on the Garver’s six-bus, IEEE 24-bus RTS and Polish 2383-bus systems. Case study results demonstrate that the proposed approach can effectively reduce cost and hedge risk in relation to increasing wind power integration.

  2. New dynamic system suggested for earth expansion

    Energy Technology Data Exchange (ETDEWEB)

    Fitzpatrick, J [Asuncion Nacional Univ. (Paraguay). Inst. de Ciencias

    1972-01-01

    It is here suggested that there may have been much more radioactive materials in the deep interior of the earth than bitherto supposed. Trapped heat being generated in the interior would provide a mechanism for earth expansion. An assumption of heat generation in the deep interior of the earth of the order of 0,5 X 10-13 calories per second, per cubic centimeter, would provide sufficient thermal expansion to account for approximately 0.1 mm. change in the radius of the earth per year.

  3. The stagnation of electric system expansion

    International Nuclear Information System (INIS)

    Santos, A.M. dos

    1989-01-01

    The main works in the Brazilian electric sector in 1988 is presented, mentioning the fault of financier resources. The electric power tariffs by a real economical cost are also cited, allowing some advantages that can resolve the investment problem in the electric power expansion. (author)

  4. A multi-period, multi-regional generation expansion planning model incorporating unit commitment constraints

    International Nuclear Information System (INIS)

    Koltsaklis, Nikolaos E.; Georgiadis, Michael C.

    2015-01-01

    Highlights: • A short-term structured investment planning model has been developed. • Unit commitment problem is incorporated into the long-term planning horizon. • Inherent intermittency of renewables is modelled in a comprehensive way. • The impact of CO_2 emission pricing in long-term investment decisions is quantified. • The evolution of system’s marginal price is evaluated for all the planning horizon. - Abstract: This work presents a generic mixed integer linear programming (MILP) model that integrates the unit commitment problem (UCP), i.e., daily energy planning with the long-term generation expansion planning (GEP) framework. Typical daily constraints at an hourly level such as start-up and shut-down related decisions (start-up type, minimum up and down time, synchronization, soak and desynchronization time constraints), ramping limits, system reserve requirements are combined with representative yearly constraints such as power capacity additions, power generation bounds of each unit, peak reserve requirements, and energy policy issues (renewables penetration limits, CO_2 emissions cap and pricing). For modelling purposes, a representative day (24 h) of each month over a number of years has been employed in order to determine the optimal capacity additions, electricity market clearing prices, and daily operational planning of the studied power system. The model has been tested on an illustrative case study of the Greek power system. Our approach aims to provide useful insight into strategic and challenging decisions to be determined by investors and/or policy makers at a national and/or regional level by providing the optimal energy roadmap under real operating and design constraints.

  5. An investigation on the impacts of regulatory interventions on wind power expansion in generation planning

    International Nuclear Information System (INIS)

    Alishahi, Ehsan; Moghaddam, Mohsen P.; Sheikh-El-Eslami, Mohammad K.

    2011-01-01

    Large integration of intermittent wind generation in power system has necessitated the inclusion of more innovative and sophisticated approaches in power system investment planning. This paper presents a novel framework on the basis of a combination of stochastic dynamic programming (SDP) algorithm and game theory to study the impacts of different regulatory interventions to promote wind power investment in generation expansion planning. In this study, regulatory policies include Feed-in-Tariff (FIT) incentive, quota and tradable green certificate. The intermittent nature and uncertainties of wind power generation will cause the investors encounter risk in their investment decisions. To overcome this problem, a novel model has been derived to study the regulatory impacts on wind generation expansion planning. In our approach, the probabilistic nature of wind generation is modeled. The model can calculate optimal investment strategies, in which the wind power uncertainty is included. This framework is implemented on a test system to illustrate the working of the proposed approach. The result shows that FITs are the most effective policy to encourage the rapid and sustained deployment of wind power. FITs can significantly reduce the risks of investing in renewable energy technologies and thus create conditions conducive to rapid market growth. - Highlights: → The impacts of regulatory policies to promote wind power investment are investigated. → These policies include Feed-in-Tariff (FIT), quota and tradable green certificate. → Result shows that FIT is an effective policy to motivate the rapid growth of wind power. → In quota, customers are forced to provide the quota decided by regulators from wind.

  6. Transmission investment and expansion planning in a restructured electricity market

    International Nuclear Information System (INIS)

    Wu, F.F; Wen, F.S.; Zheng, F.L.

    2006-01-01

    Transmission planning in a restructured electricity market becomes increasingly complicated. To bridge the gap between economic and engineering considerations, this survey paper suggests a framework to clarify the interactions among various economic and engineering issues by reviewing recent theoretical and practical progress in transmission investment and transmission planning methodology. Thus, the paper makes economic literature more accessible to the engineering community and engineering literature more accessible to the economic community interested in the subject. (author)

  7. Nuclear plants in the expansion of the Mexican electrical system;Plantas nucleares en la expansion del sistema electrico mexicano

    Energy Technology Data Exchange (ETDEWEB)

    Estrada S, G. J.; Martin del Campo M, C., E-mail: gestradas@yahoo.co [UNAM, Facultad de Ingenieria, Departamento de Sistemas Energeticos, Ciudad Universitaria, 04510 Mexico D. F. (Mexico)

    2009-10-15

    In this work the results of four studies appear that were realized to analyze plans of long term expansion of Mexican electrical system of generation for the study period 2005-2025. The objective is to identify between the two third generation reactors with greater maturity at present which is it is that it can be integrated better in the expansion of the Mexican electrical system of generation. It was analyzed which of the four cases represents the best expansion plan in terms of two only parameters that are: 1) total cost of generation and, 2) the diversity of generated energy in all the period. In all studies candidates three different units of combined cycle were considered (802, 583 and 291 MW), a turbo gas unit of 267 MW, units of 700 MW with coal base and integrated de sulphur, geo thermo electrical units of 26.95 MW and two different types of nuclear units. In both first studies the Advanced Boiling Water Reactor (A BWR) for the nuclear units is considered, considering that is technology with more maturity of all the third generation reactors. In the following two studies were considered the European Pressurized Reactor (EPR), also of third generation, that uses in essence technology more spread to world-wide level. For this task was used the uni nodal planning model WASP-IV, developed by the IAEA to find the expansion configuration with less generation cost for each study. Considering the present situation of the generation system, the capacity additions begin starting from the year 2012 for the four studies. It is not considered the installation of nuclear plants before 2016 considering that its planning period takes 3 years, and the construction period requires at least of 5 years. In order to evaluate the diversity of each study it was used the Stirling Index or of Shannon-Weiner. In order to classify the studies in cost terms and diversity it was used like decision tool the Savage criterion, called also of minimal repentance. With this data, taking

  8. Powering the people: India's capacity expansion plans

    Energy Technology Data Exchange (ETDEWEB)

    Patel, S.

    2009-05-15

    India has become a global business power even though hundreds of millions of its citizens still live in poverty. To sustain economic growth and lift its people out of poverty, India needs more and more reliable power. Details of government plans for achieving those goals demonstrate that pragmatism may be in shorter supply than ambition and political will. 1 ref., 12 figs., 1 tab.

  9. The expansion of electric power systems considering the operation reliability; Expansion de sistemas electricos considerando la securidad de servicio

    Energy Technology Data Exchange (ETDEWEB)

    Cortes, Marcelo A. [Universidad de Antofagasta (Chile). Dept. de Ingenieria Electrica; Moya A, Oscar [Chile Univ., Santiago (Chile). Dept. de Ingenieria Civil

    1997-12-31

    This publication describes a procedure based in an linear programming for the planning of the expansion of mediating term in power systems. The implicit alternatives for network expansion, whether power plants or transmission lines, are classified according to indexes of reinforcement. The indexes are gotten resulting shadow pricing upon resolving a problem of minimum cost of operation and outage. The network is subjected to the most probable contingencies and from these outputs the expected reinforcement results are obtained. The problem of the reactive power accounts for restrictions in line capacity and prior evaluation of A C power flux. Results obtained are used for methodology validation. (author) 12 refs., 1 fig., 3 tabs.; e-mail: mcortes at apolo.cc.uantof.cl.; osmoya at tamarugo.cec.uchile.cl

  10. Stochastic-based resource expansion planning for a grid-connected microgrid using interval linear programming

    International Nuclear Information System (INIS)

    Shaban Boloukat, Mohammad Hadi; Akbari Foroud, Asghar

    2016-01-01

    This paper represents a stochastic approach for long-term optimal resource expansion planning of a grid-connected microgrid (MG) containing different technologies as intermittent renewable energy resources, energy storage systems and thermal resources. Maximizing profit and reliability, along with minimizing investment and operation costs, are major objectives which have been considered in this model. Also, the impacts of intermittency and uncertainty in renewable energy resources were investigated. The interval linear programming (ILP) was applied for modelling inherent stochastic nature of the renewable energy resources. ILP presents some superiority in modelling of uncertainties in MG planning. The problem was formulated as a mixed-integer linear programming. It has been demonstrated previously that the benders decomposition (BD) served as an effective tool for solving such problems. BD divides the original problem into a master (investment) problem and operation and reliability subproblems. In this paper a multiperiod MG planning is presented, considering life time, maximum penetration limit of each technology, interest rate, capital recovery factor and investment fund. Real-time energy exchange with the utility is covered, with a consideration of variable tariffs at different load blocks. The presented approach can help MG planners to adopt best decision under various uncertainty levels based on their budgetary policies. - Highlights: • Considering uncertain nature of the renewable resources with applying ILP. • Considering the effect of intermittency of renewable in MG planning. • Multiobjective MG planning problem which covers cost, profit and reliability. • Multiperiod approach for MG planning considering life time and MPL of technologies. • Presenting real-time energy exchange with the utility considering variable tariffs.

  11. Uses and updating of the Benders method in the integer-mixed programming in the planning of the electric power systems expansion; Usos y actualizacion del metodo de Benders en la programacion entera-mixta y en la planeacion de la expansion de los sistemas electricos de potencia

    Energy Technology Data Exchange (ETDEWEB)

    De la Torre Vega, Eli

    1997-04-01

    In the first chapter the deduction of the Benders cuts are presented, departing from the properties of duality. Also the properties of the Benders cuts are presented, as well as the initial algorithm of Benders to solve any problem of lineal integer-mixed programming are presented. In the second chapter, of the planning of the expansion of means of generation and transmission in an electric power system is presented and the different structures of the mathematical programming it gives rise to and how the method of Benders can be adapted to these. In the third chapter the theoretical contributions of this work are presented: a) How to initialize the master problem to take advantage of the acquired experience after having solved a similar problem, so that it can be solved more efficiently, the succession of integer-mixed problems of linear programming that arise when solving the problem of the planning of the expansion of generation and transmission means in an electric power system. b) How to generate a master problem whose continuous optimal solution corresponds to the optimal continuous one of the integer-mixed problem, so that the search of integer solutions is made in the vicinity of the optimum continuous. c) How to generate an integer solution, close to the optimum continuous of the integer-mixed problem, that has high probability of being feasible, and that is perhaps the optimal integer solution, in a smaller time than that required to solve it in exact form. In addition, other ideas are presented that can be incorporated to the Benders method. In order to show the effectiveness of the proposed ideas, in chapter 4 the results obtained when solving several problems are presented using: 1. The updated Benders method, 2. The branch and bound method, 3. The update of Benders when adding restrictions and 4. The update of Benders when considered as integer each time to more variables. Finally a summary is made of the achievements, of the conclusions obtained and

  12. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  13. Generation Expansion Planning in pool market: A hybrid modified game theory and improved genetic algorithm

    International Nuclear Information System (INIS)

    Shayanfar, H.A.; Lahiji, A. Saliminia; Aghaei, J.; Rabiee, A.

    2009-01-01

    Unlike the traditional policy, Generation Expansion Planning (GEP) problem in competitive framework is complicated. In the new policy, each Generation Company (GENCO) decides to invest in such a way that obtains as much profit as possible. This paper presents a new hybrid algorithm to determine GEP in a Pool market. The proposed algorithm is divided in two programming levels: master and slave. In the master level a Modified Game Theory (MGT) is proposed to evaluate the contrast of GENCOs by the Independent System Operator (ISO). In the slave level, an Improved Genetic Algorithm (IGA) method is used to find the best solution of each GENCO for decision-making of investment. The validity of the proposed method is examined in the case study including three GENCOs with multi-type of power plants. The results show that the presented method is both satisfactory and consistent with expectation. (author)

  14. Generation expansion planning in Pool market: A hybrid modified game theory and particle swarm optimization

    International Nuclear Information System (INIS)

    Moghddas-Tafreshi, S.M.; Shayanfar, H.A.; Saliminia Lahiji, A.; Rabiee, A.; Aghaei, J.

    2011-01-01

    Unlike the traditional policy, Generation Expansion Planning (GEP) problem in competitive framework is complicated. In the new policy, each GENeration COmpany (GENCO) decides to invest in such a way that obtains as much profit as possible. This paper presents a new hybrid algorithm to determine GEP in a Pool market. The proposed algorithm is divided in two programming levels: master and slave. In the master level a modified game theory (MGT) is proposed to evaluate the contrast of GENCOs by the Independent System Operator (ISO). In the slave level, a particle swarm optimization (PSO) method is used to find the best solution of each GENCO for decision-making of investment. The validity of the proposed method is examined in the case study including three GENCOs with multi-types of power plants. The results show that the presented method is both satisfactory and consistent with expectation.

  15. Techniques of artificial intelligence applied to the electric power expansion distribution system planning problem; Tecnicas de inteligencia artificial aplicadas ao problema de planejamento da expansao do sistema de distribuicao de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Froes, Salete Maria

    1996-07-01

    A tool named Constrained Decision Problem (CDP), which is based on Artificial Intelligence and a specific application to Distribution System Planning is described. The CDP allows multiple objective optimization that does not, necessarily, result in a single optimal solution. First, a literature review covers published works related to Artificial Intelligence applications to Electric Power Distribution Systems, emphasizing feeder restoration and reconfiguration. Some concepts related to Artificial Intelligence are described, with particular attention to Planning and to Constrained Decision Problems. Following, an Electric Power System planning model is addressed by using the CDP tool. Some case studies illustrate the Distribution Planning model, which are compared with standard optimization models. Concluding, some comments establishing the possibilities of CDP applications are followed by a view on future developments. (author)

  16. Electric power transmission system: A new expansion scheme

    International Nuclear Information System (INIS)

    Unidad de Planeacion Minero Energetica, UPME

    2000-01-01

    With the purpose of responding to the interconnection requirements among the main cities of the country, a company of public character was created, in charge of the planning and of the development of the national interconnected system (NIS), in such form that their work optimized the use of the available energy resources for the electricity supply and it improved the accounting levels and quality of the service. Starting from 1967, interconnection electric Corp., ISA, a very important task began in the development of methodologies and strategies of expansion of the INS that it allowed, in very short term, to connect the areas of Bogota the Atlantic Cost, Antioquia and the Cauca Valley and to develop important generation projects for the supply of electric power of the country. Then, the electric sector was reformed through the laws 142 and 143 of 1994, in search of the specialization of the business and in that sense, ISA is divided in two companies: ISAGEN that the activities degeneration and electric power commercialization, and ISA, company electric power transport, that it takes charge of the interconnection of the national system assumes. In connection with the execution of the transmission works and in the face of the possibility of lingering courts of energy, the law establishes that ISA will carry out the works that are needed and that the particular initiative doesn't develop. For that same time, it is considered that the planning should be carried out in an integral way, taking into account the requirements of the population's energy and its possibilities of supply and through programs and actions of appropriate use of the available energy resources. The UPME (Unit of Planning Miner Energetic) was created for assumes this work, so with their analyses they already offer signs to the state the investors, about the population's necessities and of the business opportunities, respectively

  17. Studying influence of two effective parameters on network losses in transmission expansion planning using DCGA

    International Nuclear Information System (INIS)

    Shayeghi, H.; Jalilzadeh, S.; Mahdavi, M.; Hadadian, H.

    2008-01-01

    Transmission network expansion planning (TNEP) is a basic part of power network planning that determines where, when and how many new transmission lines should be added to the network. Its task is to minimize the network construction and operational cost, while meeting imposed technical, economic and reliability constraints. Up till now, various methods have been proposed for solution of the static transmission network expansion planning (STNEP) problem. But, in all of them, the effect of two important parameters i.e., inflation rate and load growth factor on network losses has not been investigated. Thus, in this paper, STNEP is being studied considering the effect of inflation rate and load growth factor on the network losses in a transmission network with different voltage levels using a decimal codification genetic algorithm (DCGA). The effectiveness of the proposed idea is tested on the Garver's six-bus network. The results evaluation reveals that the inflation rate and load growth factor have important effect on the network losses and subsequent network arrangement. In addition, considering the effect of two above-mentioned parameters (inflation rate and load growth factor) in expansion planning of transmission networks with various line voltage levels is caused that the total expansion cost of the network (expansion costs and the operational cost) is calculated more exactly and therefore the network satisfies the requirements of delivering electric power more safely and reliably to load centers

  18. Multistage and multiobjective formulations of globally optimal upgradable expansions for electric power distribution systems

    Science.gov (United States)

    Vaziri Yazdi Pin, Mohammad

    Electric power distribution systems are the last high voltage link in the chain of production, transport, and delivery of the electric energy, the fundamental goals of which are to supply the users' demand safely, reliably, and economically. The number circuit miles traversed by distribution feeders in the form of visible overhead or imbedded underground lines, far exceed those of all other bulk transport circuitry in the transmission system. Development and expansion of the distribution systems, similar to other systems, is directly proportional to the growth in demand and requires careful planning. While growth of electric demand has recently slowed through efforts in the area of energy management, the need for a continued expansion seems inevitable for the near future. Distribution system and expansions are also independent of current issues facing both the suppliers and the consumers of electrical energy. For example, deregulation, as an attempt to promote competition by giving more choices to the consumers, while it will impact the suppliers' planning strategies, it cannot limit the demand growth or the system expansion in the global sense. Curiously, despite presence of technological advancements and a 40-year history of contributions in the area, many of the major utilities still relay on experience and resort to rudimentary techniques when planning expansions. A comprehensive literature review of the contributions and careful analyses of the proposed algorithms for distribution expansion, confirmed that the problem is a complex, multistage and multiobjective problem for which a practical solution remains to be developed. In this research, based on the 15-year experience of a utility engineer, the practical expansion problem has been clearly defined and the existing deficiencies in the previous work identified and analyzed. The expansion problem has been formulated as a multistage planning problem in line with a natural course of development and industry

  19. State Environmental Policy Act (SEPA) Environmental Checklist Form 216-B-3 Expansion Ponds Closure Plan

    International Nuclear Information System (INIS)

    1993-12-01

    The 216-B-3 Expansion Ponds Closure Plan (Revision 1) consists of a Part A Dangerous Waste Permit Application and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. The 216-B-3 Pond System consists of a series of four earthen, unlined, interconnected ponds and the 216-B-3-3 Ditch that receive waste water from various 200 East Area operating facilities. These four ponds, collectively. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the 216-B-3-3 Ditch. Water discharged to the 216-8-3-3 Ditch flows directly into the 216-B-3 Pond. In the past, waste water discharges to B Pond and the 216-B-3-3 Ditch contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the nonradioactive dangerous portion of mixed waste is regulated under RCRA. Mixed waste also may be considered a hazardous substance under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) when considering remediation of waste sites

  20. Electricity system expansion studies to consider uncertainties and interactions in restructured markets

    Science.gov (United States)

    Jin, Shan

    This dissertation concerns power system expansion planning under different market mechanisms. The thesis follows a three paper format, in which each paper emphasizes a different perspective. The first paper investigates the impact of market uncertainties on a long term centralized generation expansion planning problem. The problem is modeled as a two-stage stochastic program with uncertain fuel prices and demands, which are represented as probabilistic scenario paths in a multi-period tree. Two measurements, expected cost (EC) and Conditional Value-at-Risk (CVaR), are used to minimize, respectively, the total expected cost among scenarios and the risk of incurring high costs in unfavorable scenarios. We sample paths from the scenario tree to reduce the problem scale and determine the sufficient number of scenarios by computing confidence intervals on the objective values. The second paper studies an integrated electricity supply system including generation, transmission and fuel transportation with a restructured wholesale electricity market. This integrated system expansion problem is modeled as a bi-level program in which a centralized system expansion decision is made in the upper level and the operational decisions of multiple market participants are made in the lower level. The difficulty of solving a bi-level programming problem to global optimality is discussed and three problem relaxations obtained by reformulation are explored. The third paper solves a more realistic market-based generation and transmission expansion problem. It focuses on interactions among a centralized transmission expansion decision and decentralized generation expansion decisions. It allows each generator to make its own strategic investment and operational decisions both in response to a transmission expansion decision and in anticipation of a market price settled by an Independent System Operator (ISO) market clearing problem. The model poses a complicated tri-level structure

  1. OPEC production: Capital limitations, environmental movements may interfere with expansion plans

    International Nuclear Information System (INIS)

    Ismail, I.A.H.

    1994-01-01

    Obtaining capital is a critical element in the production expansion plans of OPEC member countries. Another issue that may impact the plans is the environmental taxes that may reduce the call on OPEC oil by 5 million b/d in 2000 and about 16 million b/d in the year 2010. This concluding part of a two-part series discusses the expansion possibilities of non-Middle East OPEC members, OPEC's capital requirements, and environmental concerns. Non-Middle East OPEC includes Algeria, Gabon, Indonesia, Libya, Nigeria, and Venezuela

  2. Planning Systems for Distributed Operations

    Science.gov (United States)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  3. Effect of economic parameters on power generation expansion planning

    International Nuclear Information System (INIS)

    Sevilgen, Sueleyman Hakan; Hueseyin Erdem, Hasan; Cetin, Burhanettin; Volkan Akkaya, Ali; Dagdas, Ahmet

    2005-01-01

    The increasing consumption of electricity within time forces countries to build additional power plants. Because of technical and economic differences of the additional power plants, economic methodologies are used to determine the best technology for the additional capacity. The annual levelized cost method is used for this purpose, and the technology giving the minimum value for the additional load range is chosen. However, the economic parameters such as interest rate, construction escalation, fuel escalation, maintenance escalation and discount factor can affect the annual levelized cost considerably and change the economic range of the plants. Determining the values of the economical parameters in the future is very difficult, especially in developing countries. For this reason, the analysis of the changing rates of the mentioned values is of great importance for the planners of the additional capacity. In this study, the changing rates of the economic parameters that influence the annual levelized cost of the alternative power plant types are discussed. The alternative power plants considered for the electricity generation sector of Turkey and the economic parameters dominating each plant type are determined. It is clearly seen that the annual levelized cost for additional power plants varies with the economic parameters. The results show that the economic parameters variation has to be taken into consideration in electricity generation planning

  4. Optics Supply Planning System

    International Nuclear Information System (INIS)

    Gaylord, J.

    2009-01-01

    The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system

  5. Oncentra brachytherapy planning system.

    Science.gov (United States)

    Yang, Jack

    2018-03-27

    In modern cancer management, treatment planning has progressed as a contemporary tool with all the advances in computing power in recent years. One of the advanced planning tools uses 3-dimensional (3D) data sets for accurate dose distributions in patient prescription. Among these planning processes, brachytherapy has been a very important part of a successful cancer management program, offering clinical benefits with specific or combined treatments with external beam therapy. In this chapter, we mainly discussed the Elekta Oncentra planning system, which is the main treatment planning tool for high-dose rate (HDR) modality in our facility and in many other facilities in the United States. HDR is a technically advanced form of brachytherapy; a high-intensity radiation source (3.6 mm in length) is delivered with step motor in submillimeter precision under computer guidance directly into the tumor areas while minimizing injury to surrounding normal healthy tissue. Oncentra planning is the key component to generate a deliverable brachytherapy procedure, which is executed on the microSelectron V3 remote afterloader treatment system. Creating a highly conformal plan can be a time-consuming task. The development of Oncentra software (version 4.5.3) offers a variety of useful tools that facilitate many of the clinical challenging tasks for planning, such as contouring and image reconstruction, as well as rapid planning calculations with dose and dose volume histogram analysis. Oncentra Brachy module creates workflow and optimizes the planning accuracy for wide varieties of clinical HDR treatments, such as skin, gynecologic (GYN), breast, prostate, and many other applications. The treatment file can also be transferred to the afterloader control station for speedy delivery. The design concept, calculation algorithms, and optimization modules presented some key characteristics to plan and treat the patients effectively and accurately. The dose distribution and accuracy of

  6. Decentralized planning of hydroelectric power systems

    International Nuclear Information System (INIS)

    Binato, S.; Pereira, M.V.F.

    1995-01-01

    This paper discusses the application of marginal cost concepts to the expansion planning of hydroelectric systems. It is shown that the renumeration of hydroelectric plants should not be based on their energy production, as this leads to excessive revenues for the plant owner, and distorts the dimensioning of upstream reservoirs. In order to produce the adequate economic signals, it is necessary to separate the contributions of turbines and reservoirs. Examples from the Brazilian power system are presented and discussed

  7. Systems engineering management plan

    International Nuclear Information System (INIS)

    Conner, C.W.

    1985-10-01

    The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe the systems engineering procedures to be implemented at the Program level and the minimum requirements for systems engineering at the Program-element level. The Program level corresponds to the Director, OCRWM, or to the organizations within OCRWM to which the Director delegates responsibility for the development of the System and for coordinating and integrating the activities at the Program-element level. The Office of Policy and Outreach (OPO) and the Office of Resource Management (ORM) support the Director at the Program level. The Program-element level corresponds to the organizations within OCRWM (i.e., the Office of Geologic Repositories (OGR) and the Office of Storage and Transportation Systems (OSTS)) with overall responsibility for developing the System elements - that is, the mined geologic disposal system (MGDS), monitored retrievable storage (MRS) (if approved by Congress), and the transportation system

  8. Expansion of the CHR bone code system

    International Nuclear Information System (INIS)

    Farnham, J.E.; Schlenker, R.A.

    1976-01-01

    This report describes the coding system used in the Center for Human Radiobiology (CHR) to identify individual bones and portions of bones of a complete skeletal system. It includes illustrations of various bones and bone segments with their respective code numbers. Codes are also presented for bone groups and for nonbone materials

  9. Mobile systems capability plan

    International Nuclear Information System (INIS)

    1996-09-01

    This plan was prepared to initiate contracting for and deployment of these mobile system services. 102,000 cubic meters of retrievable, contact-handled TRU waste are stored at many sites around the country. Also, an estimated 38,000 cubic meters of TRU waste will be generated in the course of waste inventory workoff and continuing DOE operations. All the defense TRU waste is destined for disposal in WIPP near Carlsbad NM. To ship TRU waste there, sites must first certify that the waste meets WIPP waste acceptance criteria. The waste must be characterized, and if not acceptable, subjected to additional processing, including repackaging. Most sites plan to use existing fixed facilities or open new ones between FY1997-2006 to perform these functions; small-quantity sites lack this capability. An alternative to fixed facilities is the use of mobile systems mounted in trailers or skids, and transported to sites. Mobile systems will be used for all characterization and certification at small sites; large sites can also use them. The Carlsbad Area Office plans to pursue a strategy of privatization of mobile system services, since this offers a number of advantages. To indicate the possible magnitude of the costs of deploying mobile systems, preliminary estimates of equipment, maintenance, and operating costs over a 10-year period were prepared and options for purchase, lease, and privatization through fixed-price contracts considered

  10. Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing

    OpenAIRE

    Kimms, Alf

    1996-01-01

    This contribution discusses the measurement of (in-)stability of finite horizon production planning when done on a rolling horizon basis. As examples we review strategic capacity expansion planning, tactical master production schedulng, and operational capacitated lot sizing.

  11. LPV system identification using series expansion models

    NARCIS (Netherlands)

    Toth, R.; Heuberger, P.S.C.; Hof, Van den P.M.J.; Santos, dos P.L.; Perdicoúlis, T.P.A.; Novara, C.; Ramos, J.A.; Rivera, D.E.

    2011-01-01

    This review volume reports the state-of-the-art in Linear Parameter Varying (LPV) system identification. Written by world renowned researchers, the book contains twelve chapters, focusing on the most recent LPV identification methods for both discrete-time and continuous-time models, using different

  12. Decenal plan of electric energy expansion - 2006-2015; Plano decenal de expansao de energia eletrica - 2006-2015

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    This report is divided into seven chapters and presents: 1) Introduction - a brief description of the institutional context of the study and the decenal planning role in this context; 2) electric power market - the evolution of market and economy conjuncture of electric power and the basic premises for the market projections, including the considered macroeconomic scenery description; 3) electric power generation - considered premises, methodology and criteria for the formulation and adjustment of generation expansion alternatives of electric power; 4) electric power transmission - main aspects which guided the evolution of the interlinked system reference configuration in the decenal period and a description of the main result of transmission system expansion analysis, consolidated by SIN geoelectric region and by each state of these regions; 5) socioenvironmental analysis - adopted methodology and the results of the socioenvironmental analysis for the foreseen business in the decenal horizon; 6) expansion indicators of the electric system - synthesizes the main indicators referring to the decenal period as far the market evolution, generation expansion and transmission is concerned; 7)bibliographic references.

  13. Vulnerability effects of passengers' intermodal transfer distance preference and subway expansion on complementary urban public transportation systems

    International Nuclear Information System (INIS)

    Hong, Liu; Yan, Yongze; Ouyang, Min; Tian, Hui; He, Xiaozheng

    2017-01-01

    The vulnerability studies on urban public transportation systems have attracted growing attentions in recent years, due to their important role in the economy development of a city and the well-beings of its citizens. This paper proposes a vulnerability model of complementary urban public transportation systems (CUPTSs) composed of bus systems and subway systems, with the consideration of passengers’ intermodal transfer distance preference (PITDP) to capture different levels of complementary strength between the two systems. Based on the model, this paper further introduces a CUPTSs-aimed vulnerability analysis method from two specific aspects: (a) vulnerability effects of different PITDP values, which facilitate the design of policies to change PITDP to reduce system vulnerability; (b) vulnerability effects of different subway expansion plans, which facilitate the vulnerability investigation of current expansion plan and the identification of the optimal expansion plan from the system vulnerability perspective. The proposed CUPTSs-aimed vulnerability analysis method is applied to investigate the complementary bus and subway systems in the city of Wuhan, China. The insights from this study are helpful to analyze other CUPTSs for valuable planning suggestions from the vulnerability perspective. - Highlights: • We model complementary urban public transportation systems’ (CUPTSs) vulnerability. • We use a PITDP metric to capture different levels of complementary relationship. • We study vulnerability under different PITDP and different subway expansion plans. • We analyze dynamic vulnerability of CUPTSs during their expansion process.

  14. Incorporating environmental externalities into the capacity expansion planning: An Israeli case study

    International Nuclear Information System (INIS)

    Becker, Nir; Soloveitchik, David; Olshansky, Moshe

    2011-01-01

    Highlights: → Long term energy-environmental planning problems for the electricity sector. → Environmental considerations in the capacity expansion plan. → Modified version of WASP-IV as a multiple objective programming model. → Multi-objective analysis of trade-offs between costs and pollutants reduction. -- Abstract: In this paper we use the WASP-IV model and develop methodology to estimate the impact of several environmental externality costs on the electricity sector development plan. For this purpose, 22 cases were generated which were later on reduced to only seven non-dominated cases by considering this problem as a dynamic multiple objective programming model. The major impact of internalizing the external cost is on fuel use. In the electricity generation system more natural gas and less coal has been used. A cost benefit analysis (CBA) of three scenarios has been performed focusing on taxing only one pollutant while looking at its overall implication. The benefit cost ratio was about 4.5 while the net benefit was about 200 million USD (depending on the scenario). Multi-objective analysis among the different scenarios was carried in a dynamic setting. Seven scenarios appear in the non-dominated set. Out of them five appears in every year and those should have a higher weight placed on them by policy makers. Out of those five, two are a single tax on one pollutant. Thus, policy makers might want to consider a mixture of taxes but for the sake of simplicity can also use a simple one tax on a given pollutant.

  15. Generation Expansion Planning With Large Amounts of Wind Power via Decision-Dependent Stochastic Programming

    Energy Technology Data Exchange (ETDEWEB)

    Zhan, Yiduo; Zheng, Qipeng P.; Wang, Jianhui; Pinson, Pierre

    2017-07-01

    Power generation expansion planning needs to deal with future uncertainties carefully, given that the invested generation assets will be in operation for a long time. Many stochastic programming models have been proposed to tackle this challenge. However, most previous works assume predetermined future uncertainties (i.e., fixed random outcomes with given probabilities). In several recent studies of generation assets' planning (e.g., thermal versus renewable), new findings show that the investment decisions could affect the future uncertainties as well. To this end, this paper proposes a multistage decision-dependent stochastic optimization model for long-term large-scale generation expansion planning, where large amounts of wind power are involved. In the decision-dependent model, the future uncertainties are not only affecting but also affected by the current decisions. In particular, the probability distribution function is determined by not only input parameters but also decision variables. To deal with the nonlinear constraints in our model, a quasi-exact solution approach is then introduced to reformulate the multistage stochastic investment model to a mixed-integer linear programming model. The wind penetration, investment decisions, and the optimality of the decision-dependent model are evaluated in a series of multistage case studies. The results show that the proposed decision-dependent model provides effective optimization solutions for long-term generation expansion planning.

  16. A multiple objective mixed integer linear programming model for power generation expansion planning

    Energy Technology Data Exchange (ETDEWEB)

    Antunes, C. Henggeler; Martins, A. Gomes [INESC-Coimbra, Coimbra (Portugal); Universidade de Coimbra, Dept. de Engenharia Electrotecnica, Coimbra (Portugal); Brito, Isabel Sofia [Instituto Politecnico de Beja, Escola Superior de Tecnologia e Gestao, Beja (Portugal)

    2004-03-01

    Power generation expansion planning inherently involves multiple, conflicting and incommensurate objectives. Therefore, mathematical models become more realistic if distinct evaluation aspects, such as cost and environmental concerns, are explicitly considered as objective functions rather than being encompassed by a single economic indicator. With the aid of multiple objective models, decision makers may grasp the conflicting nature and the trade-offs among the different objectives in order to select satisfactory compromise solutions. This paper presents a multiple objective mixed integer linear programming model for power generation expansion planning that allows the consideration of modular expansion capacity values of supply-side options. This characteristic of the model avoids the well-known problem associated with continuous capacity values that usually have to be discretized in a post-processing phase without feedback on the nature and importance of the changes in the attributes of the obtained solutions. Demand-side management (DSM) is also considered an option in the planning process, assuming there is a sufficiently large portion of the market under franchise conditions. As DSM full costs are accounted in the model, including lost revenues, it is possible to perform an evaluation of the rate impact in order to further inform the decision process (Author)

  17. Modeling and solving a large-scale generation expansion planning problem under uncertainty

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Shan; Ryan, Sarah M. [Iowa State University, Department of Industrial and Manufacturing Systems Engineering, Ames (United States); Watson, Jean-Paul [Sandia National Laboratories, Discrete Math and Complex Systems Department, Albuquerque (United States); Woodruff, David L. [University of California Davis, Graduate School of Management, Davis (United States)

    2011-11-15

    We formulate a generation expansion planning problem to determine the type and quantity of power plants to be constructed over each year of an extended planning horizon, considering uncertainty regarding future demand and fuel prices. Our model is expressed as a two-stage stochastic mixed-integer program, which we use to compute solutions independently minimizing the expected cost and the Conditional Value-at-Risk; i.e., the risk of significantly larger-than-expected operational costs. We introduce stochastic process models to capture demand and fuel price uncertainty, which are in turn used to generate trees that accurately represent the uncertainty space. Using a realistic problem instance based on the Midwest US, we explore two fundamental, unexplored issues that arise when solving any stochastic generation expansion model. First, we introduce and discuss the use of an algorithm for computing confidence intervals on obtained solution costs, to account for the fact that a finite sample of scenarios was used to obtain a particular solution. Second, we analyze the nature of solutions obtained under different parameterizations of this method, to assess whether the recommended solutions themselves are invariant to changes in costs. The issues are critical for decision makers who seek truly robust recommendations for generation expansion planning. (orig.)

  18. Distribution Network Expansion Planning Based on Multi-objective PSO Algorithm

    DEFF Research Database (Denmark)

    Zhang, Chunyu; Ding, Yi; Wu, Qiuwei

    2013-01-01

    This paper presents a novel approach for electrical distribution network expansion planning using multi-objective particle swarm optimization (PSO). The optimization objectives are: investment and operation cost, energy losses cost, and power congestion cost. A two-phase multi-objective PSO...... algorithm was proposed to solve this optimization problem, which can accelerate the convergence and guarantee the diversity of Pareto-optimal front set as well. The feasibility and effectiveness of both the proposed multi-objective planning approach and the improved multi-objective PSO have been verified...

  19. Practical method for generation expansion planning based on the dynamic programming. Dynamic programming ni motozuku dengen keikaku shuho

    Energy Technology Data Exchange (ETDEWEB)

    Tanabe, R.; Yasuda, K.; Yokoyama, R. (Tokyo Metropolitan Univ., Tokyo (Japan))

    1992-05-20

    To supply cheap, high-reliable and a planty of the electricity is an important task of the electric supply system because the requirement for the electricity is rapidly increased in Japan. In order to solve this problem, the authors of the paper are developing a most suitable practical method based on algorithm, according to which the generation expansion planning is divided into two problems: the optimal generation mix and the optimal generation construction process and the two problems are solved respectively. But there are some bad points in the method, for example, there are only approximative practical restriction of the capacity of single machine and the existing electric supply etc., because the optimal generation mix is determined on the basis of non-linear planning. So, in the present paper, the electric supply support system is practically constructed while proposing an unified generation expansion planning based on the dynamic programming that is possible to consider these restrictions strictly and the usefullness of the method is inspected. 12 refs., 7 figs., 5 tabs.

  20. Technical papers presented at the 4. symposium of specialists in electric operational and expansion planning. v. 2; Artigos tecnicos apresentados no 4. simposio de especialistas em planejamento da operacao e expansao eletrica. v. 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    This symposium about electric operational and expansion planning presents several articles that approaches issues such as, monitoring the power system stability, electrical load modelling, reliability in power systems, optimization in power systems, integrated resources planning in power systems, reactive control through static compensators, power flow analysis, system modelling, etc

  1. Stochastic Neural Field Theory and the System-Size Expansion

    KAUST Repository

    Bressloff, Paul C.

    2010-01-01

    We analyze a master equation formulation of stochastic neurodynamics for a network of synaptically coupled homogeneous neuronal populations each consisting of N identical neurons. The state of the network is specified by the fraction of active or spiking neurons in each population, and transition rates are chosen so that in the thermodynamic or deterministic limit (N → ∞) we recover standard activity-based or voltage-based rate models. We derive the lowest order corrections to these rate equations for large but finite N using two different approximation schemes, one based on the Van Kampen system-size expansion and the other based on path integral methods. Both methods yield the same series expansion of the moment equations, which at O(1/N) can be truncated to form a closed system of equations for the first-and second-order moments. Taking a continuum limit of the moment equations while keeping the system size N fixed generates a system of integrodifferential equations for the mean and covariance of the corresponding stochastic neural field model. We also show how the path integral approach can be used to study large deviation or rare event statistics underlying escape from the basin of attraction of a stable fixed point of the mean-field dynamics; such an analysis is not possible using the system-size expansion since the latter cannot accurately determine exponentially small transitions. © by SIAM.

  2. Synchronization of complex chaotic systems in series expansion form

    International Nuclear Information System (INIS)

    Ge Zhengming; Yang Chenghsiung

    2007-01-01

    This paper studies the synchronization of complex chaotic systems in series expansion form by Lyapunov asymptotical stability theorem. A sufficient condition is given for the asymptotical stability of an error dynamics, and is applied to guiding the design of the secure communication. Finally, numerical results are studied for the Quantum-CNN oscillators synchronizing with unidirectional/bidirectional linear coupling to show the effectiveness of the proposed synchronization strategy

  3. 3D treatment planning systems.

    Science.gov (United States)

    Saw, Cheng B; Li, Sicong

    2018-01-01

    Three-dimensional (3D) treatment planning systems have evolved and become crucial components of modern radiation therapy. The systems are computer-aided designing or planning softwares that speed up the treatment planning processes to arrive at the best dose plans for the patients undergoing radiation therapy. Furthermore, the systems provide new technology to solve problems that would not have been considered without the use of computers such as conformal radiation therapy (CRT), intensity-modulated radiation therapy (IMRT), and volumetric modulated arc therapy (VMAT). The 3D treatment planning systems vary amongst the vendors and also the dose delivery systems they are designed to support. As such these systems have different planning tools to generate the treatment plans and convert the treatment plans into executable instructions that can be implemented by the dose delivery systems. The rapid advancements in computer technology and accelerators have facilitated constant upgrades and the introduction of different and unique dose delivery systems than the traditional C-arm type medical linear accelerators. The focus of this special issue is to gather relevant 3D treatment planning systems for the radiation oncology community to keep abreast of technology advancement by assess the planning tools available as well as those unique "tricks or tips" used to support the different dose delivery systems. Copyright © 2018 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.

  4. Planning the expansion of transmission with evolutionary programming; Planeacion de la expansion de transmision con programacion evolutiva

    Energy Technology Data Exchange (ETDEWEB)

    Ceciliano Meza, Jose Luis; Nieva Gomez, Rolando [Instituto de Investigaciones Electricas, Temixco, Morelos (Mexico)

    1999-07-01

    A method of evolutionary programming for the planning of transmission networks in electrical power systems is presented. This is a whole problem mixed and nonlinear, with a combinatory nature that leads to a very large number of possible solutions for electrical systems of medium and large scale. The problem of transmission planning is described briefly and later it is formulated in mathematical terms. The proposed algorithm of evolutionary programming is applied to a large scale network that is representative of the Mexican electrical system. [Spanish] Se presenta un metodo de programacion evolutiva para la planeacion de redes de transmision en sistemas electricos de potencia. Este es un problema entero mixto y no lineal, con una naturaleza combinatoria que conduce a un numero muy grande de soluciones posibles para sistemas electricos de mediana y gran escala. Se describe brevemente el problema de planeacion de transmision y posteriormente se formula en terminos matematicos. El algoritmo propuesto de programacion evolutiva se aplica a una red electrica de gran escala que es representativa del sistema electrico Mexicano.

  5. Asymptotic expansion and statistical description of turbulent systems

    International Nuclear Information System (INIS)

    Hagan, W.K. III.

    1986-01-01

    A new approach to studying turbulent systems is presented in which an asymptotic expansion of the general dynamical equations is performed prior to the application of statistical methods for describing the evolution of the system. This approach has been applied to two specific systems: anomalous drift wave turbulence in plasmas and homogeneous, isotropic turbulence in fluids. For the plasma case, the time and length scales of the turbulent state result in the asymptotic expansion of the Vlasov/Poisson equations taking the form of nonlinear gyrokinetic theory. Questions regarding this theory and modern Hamiltonian perturbation methods are discussed and resolved. A new alternative Hamiltonian method is described. The Eulerian Direct Interaction Approximation (EDIA) is slightly reformulated and applied to the equations of nonlinear gyrokinetic theory. Using a similarity transformation technique, expressions for the thermal diffusivity are derived from the EDIA equations for various geometries, including a tokamak. In particular, the unique result for generalized geometry may be of use in evaluating fusion reactor designs and theories of anomalous thermal transport in tokamaks. Finally, a new and useful property of the EDIA is pointed out. For the fluid case, an asymptotic expansion is applied to the Navier-Stokes equation and the results lead to the speculation that such an approach may resolve the problem of predicting the Kolmogorov inertial range energy spectrum for homogeneous, isotropic turbulence. 45 refs., 3 figs

  6. Evaluation of enrollee satisfaction with Iowa's Dental Wellness Plan for the Medicaid expansion population.

    Science.gov (United States)

    Reynolds, Julie C; McKernan, Susan C; Sukalski, Jennifer M C; Damiano, Peter C

    2018-12-01

    Dental coverage for Iowa's Medicaid expansion population is provided through the Dental Wellness Plan (DWP), implemented in May 2014. The plan targets healthy behavior incentives via an earned benefits structure, whereby additional services are covered if enrollees return every 6-12 months for routine dental visits. This study examines enrollee satisfaction with the DWP. We surveyed a random sample of DWP enrollees 1 year after program implementation about their experiences. Survey items covered dental plan satisfaction, self-rated measures of health, and knowledge and attitudes toward the earned benefits approach. Dental plan satisfaction was rated as low by 38 percent of respondents (n = 416), moderate by 25 percent (n = 276), and high by 37 percent (n = 402). A majority of respondents (66 percent) did not know about the earned benefits structure. Regression analysis indicated that respondents most likely to have low plan satisfaction were those who felt it was difficult to earn benefits (OR 3.66, P < 0.001) and those who were unable to find (OR 3.17, P < 0.001), or did not try to find (OR 3.51, P < 0.001), a regular dentist in the plan. Satisfaction with a new model of dental insurance was influenced by whether enrollees had a regular source of care and their perceived ability to return for regular checkups in order to earn covered benefits. © 2017 American Association of Public Health Dentistry.

  7. Preparatory Work for a Scenario-Based Electricity Expansion Plan for North Korea after Hypothetical Reunification using WASP-IV

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo; Chang, Choong Koo [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    It is noteworthy that North Korean government itself has demanded other parties' cooperation in the field of power sector as the top priority to deal with North Korean own economic issues. In this light, the researcher consider that how to build power capacity in North Korean area after reunification needs to be studied with priority. A scenario-based approach is being adopted, and three scenarios are proposed: Scenario increasing capacity at 2.4% annual rate, Imitating South Korean electricity expansion history, and reaching 80% of South Korean Annual Peak Load in 35 years. In order to carry out the research, WASP-IV (Wien Automation System Planning-IV) code developed by IAEA is, with reasonable assumptions, being executed. Annual Peak Load prediction for each scenario, load duration curve, and existing power generating facilities in North Korea are presented herein. This research is being conducted as a preparatory work for the further study. IAEA's WASP-IV is adopted for a scenario-based electricity expansion plan for North Korea after hypothetical reunification between Koreas. Input data including Annual Peak Load, load duration curve, and existing facilities are built and presented. Additional future research includes inputting candidate plants data, cost data such as construction period, operation and maintenance costs, and fuel costs, as well as decommissioning of aged power plants in North Korea to complete WASP-IV execution. Assuming reunification, electricity expansion plan would need to integrate North and South Koreas demands and facilities. However, this research narrows down its scope to North Korean demand and facilities only. Such integrated simulation could be the topic for the later research. This work was supported by the 2014 Research Fund of the KINGS.

  8. Preparatory Work for a Scenario-Based Electricity Expansion Plan for North Korea after Hypothetical Reunification using WASP-IV

    International Nuclear Information System (INIS)

    Kim, Young Joo; Chang, Choong Koo

    2014-01-01

    It is noteworthy that North Korean government itself has demanded other parties' cooperation in the field of power sector as the top priority to deal with North Korean own economic issues. In this light, the researcher consider that how to build power capacity in North Korean area after reunification needs to be studied with priority. A scenario-based approach is being adopted, and three scenarios are proposed: Scenario increasing capacity at 2.4% annual rate, Imitating South Korean electricity expansion history, and reaching 80% of South Korean Annual Peak Load in 35 years. In order to carry out the research, WASP-IV (Wien Automation System Planning-IV) code developed by IAEA is, with reasonable assumptions, being executed. Annual Peak Load prediction for each scenario, load duration curve, and existing power generating facilities in North Korea are presented herein. This research is being conducted as a preparatory work for the further study. IAEA's WASP-IV is adopted for a scenario-based electricity expansion plan for North Korea after hypothetical reunification between Koreas. Input data including Annual Peak Load, load duration curve, and existing facilities are built and presented. Additional future research includes inputting candidate plants data, cost data such as construction period, operation and maintenance costs, and fuel costs, as well as decommissioning of aged power plants in North Korea to complete WASP-IV execution. Assuming reunification, electricity expansion plan would need to integrate North and South Koreas demands and facilities. However, this research narrows down its scope to North Korean demand and facilities only. Such integrated simulation could be the topic for the later research. This work was supported by the 2014 Research Fund of the KINGS

  9. Re-engineering closing watersheds: The negotiated expansion of a dam-based irrigation system in Bolivia

    NARCIS (Netherlands)

    Rocha Lopez, R.F.; Vincent, L.F.; Rap, E.R.

    2015-01-01

    The expansion of the Totora Khocha dam-based irrigation system in the Pucara watershed is a case of planned re-engineering of a closing watershed. This article shows how, when irrigation systems expand in space and across boundaries to capture new water, they also involve new claims by existing and

  10. El Paso natural gas nearing completion of system's largest expansion

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    El Paso Natural Gas Co.'s largest expansion program in its 64-year history will be completed along its northern system this spring or early summer. According to the company, the three-tiered, $241.5 million expansion program will increase El Paso's gas-transport capacity by 835 MMcfd to 2.5 bcfd of conventional and coal-seam gas from the San Juan basin in northwestern New Mexico. That's enough natural gas, says the company, to supply the needs of a city of more than 800,000 residents. This paper reports that the expansion involves the San Juan Triangle system, the company's northern main line, and the Permian-San Juan crossover line. The company also filed with the Federal Energy Regulatory Commission (FERC) in October 1991 to construct a new $15.2 million compressor station, Rio Vista, south of Bloomfield, N.M. The station would be used to move additional gas to the main line

  11. Linked cluster expansions for open quantum systems on a lattice

    Science.gov (United States)

    Biella, Alberto; Jin, Jiasen; Viyuela, Oscar; Ciuti, Cristiano; Fazio, Rosario; Rossini, Davide

    2018-01-01

    We propose a generalization of the linked-cluster expansions to study driven-dissipative quantum lattice models, directly accessing the thermodynamic limit of the system. Our method leads to the evaluation of the desired extensive property onto small connected clusters of a given size and topology. We first test this approach on the isotropic spin-1/2 Hamiltonian in two dimensions, where each spin is coupled to an independent environment that induces incoherent spin flips. Then we apply it to the study of an anisotropic model displaying a dissipative phase transition from a magnetically ordered to a disordered phase. By means of a Padé analysis on the series expansions for the average magnetization, we provide a viable route to locate the phase transition and to extrapolate the critical exponent for the magnetic susceptibility.

  12. Generation Expansion Planning with Large Amounts of Wind Power via Decision-Dependent Stochastic Programming

    DEFF Research Database (Denmark)

    Zhan, Yiduo; Zheng, Qipeng; Wang, Jianhui

    2016-01-01

    , the probability distribution function is determined by not only input parameters but also decision variables. To deal with the nonlinear constraints in our model, a quasi-exact solution approach is then introduced to reformulate the multistage stochastic investment model to a mixed-integer linear programming......Power generation expansion planning needs to deal with future uncertainties carefully, given that the invested generation assets will be in operation for a long time. Many stochastic programming models have been proposed to tackle this challenge. However, most previous works assume predetermined...

  13. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    Energy Technology Data Exchange (ETDEWEB)

    Kirby, Brendan J [ORNL

    2006-07-01

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second

  14. 2015 Plan. Project 5: transmission systems of electric power

    International Nuclear Information System (INIS)

    1992-12-01

    The planning aspects of transmission system expansion in Brazil are described, mentioning the evolution at long date of the transmission system, emphasizing the qualitative and strategic aspects. The engineering aspects and the technological development are also presented. (C.G.C.)

  15. Planning the expansion of electrical transmission networks with evolutionary programming; Planeacion de la expansion de redes de transmision electrica con programacion evolucionaria

    Energy Technology Data Exchange (ETDEWEB)

    Ceciliano Meza, Jose Luis

    1997-12-31

    In this work it is presented for the first time in the literature the solution of the problem of the planning the expansion of an electrical transmission network (PERTE) with the use of the Evolutionary Programming. The evolutionary programming is a stochastic method of optimization with similar characteristics to the generic algorithms, but different. During the development of this work it is shown what each one of these two heuristic methods of optimization consist of. Additionally, the main characteristics of other two heuristic methods known in the literature are described (Tabu Searching and Simulated Annealing). These two methods together with the genetic algorithms and decomposition of Benders have also been used to solve the problem of planning PERTE. The operation of the proposed algorithm of evolutionary programming was tested in two networks of electrical transmission. The first case of test is a system which is known in the literature. The second case is a representative system of the electrical transmission network of Central America. The results obtained improve all the results shown when applying different heuristic methods of optimization (genetic algorithms, simulated annealing and Tabu searching) to solve the same problem. [Espanol] En este trabajo se presenta por primera vez en la literatura, la solucion del problema de la planeacion de expansion de una red de transmision electrica (PERTE) con el uso de la Programacion Evolucionaria. La programacion evolucionaria es un metodo estocastico de optimizacion con caracteristicas similares a los algoritmos geneticos, pero diferente. Durante el desarrollo de este trabajo se muestra en que consiste cada uno de estos dos metodos heuristicos de optimizacion. Ademas, se describen las caracteristicas principales de otros dos metodos heuristicos conocidos en la literatura (busqueda Tabu y Recorrido Simulado). Estos dos metodos juntos con los algoritmos geneticos y descomposicion de Benders tambien han sido

  16. Long-term power generation expansion planning with short-term demand response: Model, algorithms, implementation, and electricity policies

    Science.gov (United States)

    Lohmann, Timo

    Electric sector models are powerful tools that guide policy makers and stakeholders. Long-term power generation expansion planning models are a prominent example and determine a capacity expansion for an existing power system over a long planning horizon. With the changes in the power industry away from monopolies and regulation, the focus of these models has shifted to competing electric companies maximizing their profit in a deregulated electricity market. In recent years, consumers have started to participate in demand response programs, actively influencing electricity load and price in the power system. We introduce a model that features investment and retirement decisions over a long planning horizon of more than 20 years, as well as an hourly representation of day-ahead electricity markets in which sellers of electricity face buyers. This combination makes our model both unique and challenging to solve. Decomposition algorithms, and especially Benders decomposition, can exploit the model structure. We present a novel method that can be seen as an alternative to generalized Benders decomposition and relies on dynamic linear overestimation. We prove its finite convergence and present computational results, demonstrating its superiority over traditional approaches. In certain special cases of our model, all necessary solution values in the decomposition algorithms can be directly calculated and solving mathematical programming problems becomes entirely obsolete. This leads to highly efficient algorithms that drastically outperform their programming problem-based counterparts. Furthermore, we discuss the implementation of all tailored algorithms and the challenges from a modeling software developer's standpoint, providing an insider's look into the modeling language GAMS. Finally, we apply our model to the Texas power system and design two electricity policies motivated by the U.S. Environment Protection Agency's recently proposed CO2 emissions targets for the

  17. Manager's assistant systems for space system planning

    Science.gov (United States)

    Bewley, William L.; Burnard, Robert; Edwards, Gary E.; Shoop, James

    1992-01-01

    This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.

  18. Complex systems, evolutionary planning?

    NARCIS (Netherlands)

    Bertolini, L.; de Roo, G.; Silva, E.A.

    2010-01-01

    Coping with uncertainty is a defining challenge for spatial planners. Accordingly, most spatial planning theories and methods are aimed at reducing uncertainty. However, the question is what should be done when this seems impossible? This chapter proposes an evolutionary interpretation of spatial

  19. From System Expansion to System Contraction: Access to Higher Education in Poland

    Science.gov (United States)

    Kwiek, Marek

    2013-01-01

    Access to higher education in Poland is changing due to the demography of smaller cohorts of potential students. Following a demand-driven educational expansion after the collapse of communism in 1989, the higher education system is now contracting. Such expansion/contraction and growth/decline in European higher education has rarely been…

  20. Expansion of the TFTR neutral beam computer system

    International Nuclear Information System (INIS)

    McEnerney, J.; Chu, J.; Davis, S.; Fitzwater, J.; Fleming, G.; Funk, P.; Hirsch, J.; Lagin, L.; Locasak, V.; Randerson, L.; Schechtman, N.; Silber, K.; Skelly, G.; Stark, W.

    1992-01-01

    Previous TFTR Neutral Beam computing support was based primarily on an Encore Concept 32/8750 computer within the TFTR Central Instrumentation, Control and Data Acquisition System (CICADA). The resources of this machine were 90% utilized during a 2.5 minute duty cycle. Both interactive and automatic processes were supported, with interactive response suffering at lower priority. Further, there were additional computing requirements and no cost effective path for expansion within the Encore framework. Two elements provided a solution to these problems: improved price performance for computing and a high speed bus link to the SELBUS. The purchase of a Sun SPARCstation and a VME/SELBUS bus link, allowed offloading the automatic processing to the workstation. This paper describes the details of the system including the performance of the bus link and Sun SPARCstation, raw data acquisition and data server functions, application software conversion issues, and experiences with the UNIX operating system in the mixed platform environment

  1. Co-Creating an Expansive Health Care Learning System.

    Science.gov (United States)

    Cribb, Alan; Owens, John; Singh, Guddi

    2017-11-01

    How should practices of co-creation be integrated into health professions education? Although co-creation permits a variety of interpretations, we argue that realizing a transformative vision of co-creation-one that invites professionals to genuinely reconsider the purposes, relationships, norms, and priorities of health care systems through new forms of collaborative thought and practice-will require radically rethinking existing approaches to professional education. The meaningful enactment of co-creative roles and practices requires health professionals and students to negotiate competing traditions, pressures, and expectations. We therefore suggest that the development of what we call an "expansive health care learning system" is crucial for supporting learners in meeting the challenges of establishing genuinely co-creative health care systems. © 2017 American Medical Association. All Rights Reserved.

  2. Preliminary Findings of the South Africa Power System Capacity Expansion and Operational Modelling Study: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Reber, Timothy J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Chartan, Erol Kevin [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Brinkman, Gregory L [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-01-01

    Wind and solar power contract prices have recently become cheaper than many conventional new-build alternatives in South Africa and trends suggest a continued increase in the share of variable renewable energy (vRE) on South Africa's power system with coal technology seeing the greatest reduction in capacity, see 'Figure 6: Percentage share by Installed Capacity (MW)' in [1]. Hence it is essential to perform a state-of-the-art grid integration study examining the effects of these high penetrations of vRE on South Africa's power system. Under the 21st Century Power Partnership (21CPP), funded by the U.S. Department of Energy, the National Renewable Energy Laboratory (NREL) has significantly augmented existing models of the South African power system to investigate future vRE scenarios. NREL, in collaboration with Eskom's Planning Department, further developed, tested and ran a combined capacity expansion and operational model of the South African power system including spatially disaggregated detail and geographical representation of system resources. New software to visualize and interpret modelling outputs has been developed, and scenario analysis of stepwise vRE build targets reveals new insight into associated planning and operational impacts and costs. The model, built using PLEXOS, is split into two components, firstly a capacity expansion model and secondly a unit commitment and economic dispatch model. The capacity expansion model optimizes new generation decisions to achieve the lowest cost, with a full understanding of capital cost and an approximated understanding of operational costs. The operational model has a greater set of detailed operational constraints and is run at daily resolutions. Both are run from 2017 through 2050. This investigation suggests that running both models in tandem may be the most effective means to plan the least cost South African power system as build plans seen to be more expensive than optimal by the

  3. Treatment planning systems

    International Nuclear Information System (INIS)

    Fontenla, D.P.

    2008-01-01

    All aspects of treatment planning in radiotherapy are discussed in detail. Included are, among others, machine data and their acquisition, photon dose calculations and tests thereof, criteria of acceptability, sources of uncertainties, from 2D to 3D and from 3D to IMRT, dosimetric measurements for RTP validation, frequency of QA tests and suggested tolerances for TPS, time and staff requirements, model based segmentation, multi-dimensional radiotherapy (MD C RT), and biological IMRT process. (P.A.)

  4. The generation expansion planning of the Brazilian electric sector employing genetic algorithms; O planejamento da expansao da geracao do setor eletrico brasileiro utilizando os algoritmos geneticos

    Energy Technology Data Exchange (ETDEWEB)

    Kazay, Heloisa Firmo

    2001-07-01

    The generation expansion-planning problem is a non-linear large-scale optimisation problem, which is even larger when it refers to the Brazilian system, and when one considers the multiple intervening uncertainty sources. To handle the complexity of the problem, decomposition schemes have been used. Usually, such schemes divide the expansion problem into two sub-problems: one related to the construction of new plants (investment sub-problem) and another dealing with the task of operating the system (operation sub-problem). This thesis proposes a genetic algorithm to solve the investment sub-problem. Initially, an analysis of the state of the art on the generation expansion planning and the field of the genetic algorithms are presented. Then follows a practical application of the proposed algorithm in a model of generation expansion planning under uncertainty. Finally, the results obtained in two case studies are presented and analysed. These results indicate that the proposed genetic algorithm is an effective alternative to the solution of the investment sub-problem. (author)

  5. Time-ordered product expansions for computational stochastic system biology

    International Nuclear Information System (INIS)

    Mjolsness, Eric

    2013-01-01

    The time-ordered product framework of quantum field theory can also be used to understand salient phenomena in stochastic biochemical networks. It is used here to derive Gillespie’s stochastic simulation algorithm (SSA) for chemical reaction networks; consequently, the SSA can be interpreted in terms of Feynman diagrams. It is also used here to derive other, more general simulation and parameter-learning algorithms including simulation algorithms for networks of stochastic reaction-like processes operating on parameterized objects, and also hybrid stochastic reaction/differential equation models in which systems of ordinary differential equations evolve the parameters of objects that can also undergo stochastic reactions. Thus, the time-ordered product expansion can be used systematically to derive simulation and parameter-fitting algorithms for stochastic systems. (paper)

  6. Assessment of the sustainability of a water resource system expansion

    DEFF Research Database (Denmark)

    Kjeldsen, Thomas Rødding; Rosbjerg, Dan

    2001-01-01

    A sustainability assessment method involving risk criteria related to reliability, resilience and vulnerability, has been applied to quantify the relative sustainability of possible expansions of a water resources system in the KwaZulu-Natal province South Africa. A river basin model has been setup....... Based on initial experience the method was modified leading to more credible results. A problem with assessing sustainability using risk criteria is a favouring of supply-oriented solutions, in particular when aspects not directly related to demand and availability of water are excluded....... for the water resources system, comprising all important water users within the catchment. Measures to meet the growing water demand in the catchment are discussed. Six scenarios including both supply and demand oriented solutions are identified, modelled and compared in tenus of the sustainability criteria...

  7. Expansion joint for guideway for magnetic levitation transportation system

    Science.gov (United States)

    Rossing, T.D.

    1993-02-09

    An expansion joint that allows a guideway of a magnetic levitation transportation system to expand and contract while minimizing transients occurring in the magnetic lift and drag forces acting on a magnetic levitation vehicle traveling over the joint includes an upper cut or recess extending downwardly from the upper surface of the guideway and a non-intersecting lower cut or recess that extends upwardly from the lower surface of the guideway. The side walls of the cuts can be parallel to each other and the vertical axis of the guideway; the depth of the lower cut can be greater than the depth of the upper cut; and the overall combined lengths of the cuts can be greater than the thickness of the guideway from the upper to lower surface so that the cuts will overlap, but be spaced apart from each other. The distance between the cuts can be determined on the basis of the force transients and the mechanical behavior of the guideway. A second pair of similarly configured upper and lower cuts may be disposed in the guideway; the expansion joint may consist of two upper cuts and one lower cut; or the cuts may have non-parallel, diverging side walls so that the cuts have a substantially dove-tail shape.

  8. Planning for a major expansion of the olympic dam copper/uranium resource in South Australia

    International Nuclear Information System (INIS)

    Higgins, R. J.

    2006-01-01

    Full text: Full text: The polymetallic Olympic Dam deposit in northern South Australia contains the world's largest known economic uranium resource. The current resource estimate is 3,970 million tones at 0.4 kg/t U308. Uranium is a co-product of an existing operation that also produces copper, gold and silver. Production began in 1998. Ore mined in 2006 is expected to be close to 10 million tones to produce 4,500 tonnes of uranium oxide and 220,000 tonnes of copper cathode. BHP Billiton is undertaking a pre-feasibility study into expanding annual production capacity to about 15,000 tonnes of uranium and 500,000 tonnes copper. Subject to successful completion of the pre-feasibility study and a final feasibility study, construction of the expansion could begin by early 2009, with the expanded production capacity being commissioned in 2013. The resource estimate has been significantly increased by drilling of the so-far undeveloped southern section of the orebody. Current planning indicates that this section could be mined by open pit. Ore is at depth and extends from 350 metres to about 1000 metres below surface. The existing operations facilities at Olympic Dam comprise an underground mine, and a mineral processing plant and associated infrastructure which would be expanded to support expanded mining. Major items of infrastructure could include a new powerline, water pipeline and associated coastal desalination plant, a rail link to Olympic Dam from the existing national network and further development of the Roxby Downs township (current population 4,000). The operation is regulated by an Indenture Agreement with the South Australian Government. To enable the expansion to proceed, the Indenture Agreement will be renegotiated. The operation is also regulated by the Federal Government. An Environmental Impact Statement is being developed to secure the necessary State and Federal approvals. A land access agreement is being negotiated with indigenous groups. Plans for

  9. Water supply as a constraint on transmission expansion planning in the Western interconnection

    Science.gov (United States)

    Tidwell, Vincent C.; Bailey, Michael; Zemlick, Katie M.; Moreland, Barbara D.

    2016-12-01

    Consideration of water supply in transmission expansion planning (TEP) provides a valuable means of managing impacts of thermoelectric generation on limited water resources. Toward this opportunity, thermoelectric water intensity factors and water supply availability (fresh and non-fresh sources) were incorporated into a recent TEP exercise conducted for the electric interconnection in the Western United States. The goal was to inform the placement of new thermoelectric generation so as to minimize issues related to water availability. Although freshwater availability is limited in the West, few instances across five TEP planning scenarios were encountered where water availability impacted the development of new generation. This unexpected result was related to planning decisions that favored the development of low water use generation that was geographically dispersed across the West. These planning decisions were not made because of their favorable influence on thermoelectric water demand; rather, on the basis of assumed future fuel and technology costs, policy drivers and the topology of electricity demand. Results also projected that interconnection-wide thermoelectric water consumption would increase by 31% under the business-as-usual case, while consumption would decrease by 42% under a scenario assuming a low-carbon future. Except in a few instances, new thermoelectric water consumption could be accommodated with less than 10% of the local available water supply; however, limited freshwater supplies and state-level policies could increase use of non-fresh water sources for new thermoelectric generation. Results could have been considerably different if scenarios favoring higher-intensity water use generation technology or potential impacts of climate change had been explored. Conduct of this exercise highlighted the importance of integrating water into all phases of TEP, particularly joint management of decisions that are both directly (e.g., water

  10. Information Systems for University Planning.

    Science.gov (United States)

    Robinson, Robert J.

    This paper proposes construction of a separate data base environment for university planning information, distinct from data bases and systems supporting operational functioning and management. The data base would receive some of its input from the management information systems (MIS)/transactional data bases and systems through a process of…

  11. Planning-Programming-Budgeting Systems.

    Science.gov (United States)

    Tudor, Dean

    Planning Programming and Budgeting Systems (PPBS) have been considered as either synonymous with abstract, advanced, mathematical systems analysis or as an advanced accounting and control system. If PPBS is to perform a useful function, both viewpoints must be combined such that a number of standardized procedures and reports are required and…

  12. A comparative assessment of the long term electricity expansion plans in Mexico by using the position vector of minimum regret analysis

    International Nuclear Information System (INIS)

    Martindelcampo, C.; Gonzalezbello, C. R.

    2012-01-01

    A comparative assessment of alternative expansion plans for the Mexican electricity generating system was made by applying the Position Vector of Minimum Regret Analysis (PVMRA) as a decision analysis tool. Four expansion plans were ranked according to the following decision criteria: The cost which calculates the cumulated cost of electricity generation during the time period studied. The external cost which brings into play the costs associated with the impact on health and the environment. The risk which takes into account the economic impact associated with incremental fuel prices from the baseline scenario to the high scenario. The diversity which evaluates the generation park diversity in terms of the Shannon-Weaner Index. The foreign-capital fraction in investment using foreign inputs. The carbon-free fraction which evaluates electricity generation that contributes to climate change policies. The cost of severe-accidents which is the sum of full chain damage costs and external costs of severe accidents with at least 10 injured. Optimizations were made by internalizing the external cost into the objective function of the WASP-IV model, the cost of externalise of the operation and maintenance cost, and these expansions were compared with those that did not. Special attention was paid to studying the convenience of including nuclear power in the electricity generation mix. Furthermore, better electricity expansion plans, with lower internal and external costs, were also found when the optimization had included externalise

  13. Astronomical relativistic reference systems with multipolar expansion: the global one

    International Nuclear Information System (INIS)

    Xie Yi

    2014-01-01

    With the rapid development of techniques for astronomical observations, the precision of measurements has been significantly increasing. Theories describing astronomical relativistic reference systems, which are the foundation for processing and interpreting these data now and in the future, may require extensions to satisfy the needs of these trends. Besides building a framework compatible with alternative theories of gravity and the pursuit of higher order post-Newtonian approximation, it will also be necessary to make the first order post-Newtonian multipole moments of celestial bodies be explicitly expressed in the astronomical relativistic reference systems. This will bring some convenience into modeling the observations and experiments and make it easier to distinguish different contributions in measurements. As a first step, the global solar system reference system is expressed as a multipolar expansion and the post-Newtonian mass and spin moments are shown explicitly in the metric which describes the coordinates of the system. The full expression of the global metric is given. (research papers)

  14. Optimizing Transmission Network Expansion Planning With The Mean Of Chaotic Differential Evolution Algorithm

    Directory of Open Access Journals (Sweden)

    Ahmed R. Abdelaziz

    2015-08-01

    Full Text Available This paper presents an application of Chaotic differential evolution optimization approach meta-heuristics in solving transmission network expansion planning TNEP using an AC model associated with reactive power planning RPP. The reliabilityredundancy of network analysis optimization problems implicate selection of components with multiple choices and redundancy levels that produce maximum benefits can be subject to the cost weight and volume constraints is presented in this paper. Classical mathematical methods have failed in handling non-convexities and non-smoothness in optimization problems. As an alternative to the classical optimization approaches the meta-heuristics have attracted lot of attention due to their ability to find an almost global optimal solution in reliabilityredundancy optimization problems. Evolutionary algorithms EAs paradigms of evolutionary computation field are stochastic and robust meta-heuristics useful to solve reliabilityredundancy optimization problems. EAs such as genetic algorithm evolutionary programming evolution strategies and differential evolution are being used to find global or near global optimal solution. The Differential Evolution Algorithm DEA population-based algorithm is an optimal algorithm with powerful global searching capability but it is usually in low convergence speed and presents bad searching capability in the later evolution stage. A new Chaotic Differential Evolution algorithm CDE based on the cat map is recommended which combines DE and chaotic searching algorithm. Simulation results and comparisons show that the chaotic differential evolution algorithm using Cat map is competitive and stable in performance with other optimization approaches and other maps.

  15. Planning ATES systems under uncertainty

    Science.gov (United States)

    Jaxa-Rozen, Marc; Kwakkel, Jan; Bloemendal, Martin

    2015-04-01

    Aquifer Thermal Energy Storage (ATES) can contribute to significant reductions in energy use within the built environment, by providing seasonal energy storage in aquifers for the heating and cooling of buildings. ATES systems have experienced a rapid uptake over the last two decades; however, despite successful experiments at the individual level, the overall performance of ATES systems remains below expectations - largely due to suboptimal practices for the planning and operation of systems in urban areas. The interaction between ATES systems and underground aquifers can be interpreted as a common-pool resource problem, in which thermal imbalances or interference could eventually degrade the storage potential of the subsurface. Current planning approaches for ATES systems thus typically follow the precautionary principle. For instance, the permitting process in the Netherlands is intended to minimize thermal interference between ATES systems. However, as shown in recent studies (Sommer et al., 2015; Bakr et al., 2013), a controlled amount of interference may benefit the collective performance of ATES systems. An overly restrictive approach to permitting is instead likely to create an artificial scarcity of available space, limiting the potential of the technology in urban areas. In response, master plans - which take into account the collective arrangement of multiple systems - have emerged as an increasingly popular alternative. However, permits and master plans both take a static, ex ante view of ATES governance, making it difficult to predict the effect of evolving ATES use or climactic conditions on overall performance. In particular, the adoption of new systems by building operators is likely to be driven by the available subsurface space and by the performance of existing systems; these outcomes are themselves a function of planning parameters. From this perspective, the interactions between planning authorities, ATES operators, and subsurface conditions

  16. TWRS Systems Engineering Working Plan

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1994-01-01

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations

  17. 2015 Plan. Project 6: urban and rural distribution systems

    International Nuclear Information System (INIS)

    1993-06-01

    The main development trends of distribution systems in 2015 Plan is studied, with the data of market continuity, costs and evolution of the physique system. Some factors that will influence the evolution of the distribution systems are presented and the impacts of economic view are discussed. The strategic lines that will give direction for the distribution expansion, including the energy conservation are also shown. (C.G.C.)

  18. Perturbation expansions of stochastic wavefunctions for open quantum systems

    Science.gov (United States)

    Ke, Yaling; Zhao, Yi

    2017-11-01

    Based on the stochastic unravelling of the reduced density operator in the Feynman path integral formalism for an open quantum system in touch with harmonic environments, a new non-Markovian stochastic Schrödinger equation (NMSSE) has been established that allows for the systematic perturbation expansion in the system-bath coupling to arbitrary order. This NMSSE can be transformed in a facile manner into the other two NMSSEs, i.e., non-Markovian quantum state diffusion and time-dependent wavepacket diffusion method. Benchmarked by numerically exact results, we have conducted a comparative study of the proposed method in its lowest order approximation, with perturbative quantum master equations in the symmetric spin-boson model and the realistic Fenna-Matthews-Olson complex. It is found that our method outperforms the second-order time-convolutionless quantum master equation in the whole parameter regime and even far better than the fourth-order in the slow bath and high temperature cases. Besides, the method is applicable on an equal footing for any kind of spectral density function and is expected to be a powerful tool to explore the quantum dynamics of large-scale systems, benefiting from the wavefunction framework and the time-local appearance within a single stochastic trajectory.

  19. A capacity expansion planning model for integrated water desalination and power supply chain problem

    International Nuclear Information System (INIS)

    Saif, Y.; Almansoori, A.

    2016-01-01

    Highlights: • Water and power supply chain is considered by a discrete optimization model. • The model examines the capacity expansion and operation of the supply chain problem. • Renewable/alternative power technologies and carbon mitigation are considered. • A case study of Abu Dhabi in UAE is examined as an application of the model. - Abstract: Cogeneration of water and power in integrated cogeneration production plants is a common practice in the Middle East and North Africa (MENA) countries. There are several combinations of water desalination and power technologies which give significant adverse environmental impact. Renewable and alternative energy technologies have been recently proposed as alternative power production paths in the water and power sector. In this study, we examine the optimal capacity expansion of water and power infrastructure over an extended planning horizon. A generic mixed integer linear programming model is developed to assist in the decision making process on: (1) optimal installation of cogeneration expansion capacities; (2) optimal installation of renewable and alternative power plants; (3) optimal operation of the integrated water and power supply chain over large geographical areas. Furthermore, the model considers the installation of carbon capture methods in fossil-based power plants. A case study will be presented to illustrate the mathematical programming application for the Emirate of Abu Dhabi (AD) in the United Arab Emirates (UAE). The case study is solved reflecting different scenarios: base case scenario, integration of renewable and alternative technologies scenario, and CO_2 reduction targets scenario. The results show that increased carbon tax values up to 150 $/ton-CO_2 gives a maximum 3% cost increase for the supply chain net present value. The installation of carbon capture methods is not an economical solution due to its high operation energy requirements in the order of 370 kW h per ton of captured CO_2

  20. Fujian electric system analysis and nuclear power planning

    International Nuclear Information System (INIS)

    Lin Jianwen; Fu Qiang; Cheng Ping

    1994-11-01

    The objective of the study is to conduct a long term electric expansion planning and nuclear power planning for Fujian Province. The Wien Automatic System Planning Package (WASP-III) is used to optimize the electric system. Probabilistic Simulation is one of the most favorite techniques for middle and long term generation and production cost planning of electric power system. The load duration curve is obtained by recording the load data of a time interval into a monotone non-increasing sense. Polynomial function is used to describe the load duration curve (LDC), and this LDC is prepared for probabilistic simulation in WASP-III. WASP-III is a dynamic optimizing module in the area of supply modelling. It could find out the economically optimal expansion plan for a power generating system over a period of up to thirty years, with the constraints given by the planners. The optimum is evaluated in terms of minimum discounted total costs. Generating costs, amount of energy not served and reliability of the system are analyzed in the system expansion planning by using the probabilistic simulation method. The following conclusions can be drawn from this study. Hydro electricity is the cheapest one of all available technologies and resources. After the large hydro station is committed at the end of 1995, more base load power plants are needed in the system. Coal-fired power plants with capacity of 600 MWe will be the most competitive power plants in the future of the system. At the end of the studying period, about half of the stalled capacity will be composed of these power plants. Nuclear power plants with capacity of 600 MWe are suitable for the system after the base load increases to a certain level. Oil combustion units will decrease the costs of the system. (12 tabs., 6 figs.)

  1. Incentives and barriers for wind power expansion and system integration in Denmark

    DEFF Research Database (Denmark)

    Hvelplund, Frede; Ostergaard, Poul Alberg; Meyer, Niels I

    2017-01-01

    In Denmark expansion of on-shore, near-shore and off-shore wind power is planned to increase the wind power share to 50% of electricity consumption by 2020. In this situation a continuation of past policies will not suffice, and a dual-track incentive system that both establishes incentives...... for investing in wind power and integration infrastructure with integration between the electricity, heating and transportation sectors, is required. The current Danish taxation system discourages electricity use and works against this integration. Likewise, the current day-ahead electricity spot market...... is not appropriate for a high-wind future as wind reduces price levels, but integration across sectors can partly assist in increasing demand and prices. The European Emission Trading System does not suffice in providing a level playing field for wind power and thus needs a revision. Another barrier for on...

  2. Flexible Transmission Network Expansion Planning Considering Uncertain Renewable Generation and Load Demand Based on Hybrid Clustering Analysis

    Directory of Open Access Journals (Sweden)

    Yun-Hao Li

    2015-12-01

    Full Text Available This paper presents a flexible transmission network expansion planning (TNEP approach considering uncertainty. A novel hybrid clustering technique, which integrates the graph partitioning method and rough fuzzy clustering, is proposed to cope with uncertain renewable generation and load demand. The proposed clustering method is capable of recognizing the actual cluster distribution of complex datasets and providing high-quality clustering results. By clustering the hourly data for renewable generation and load demand, a multi-scenario model is proposed to consider the corresponding uncertainties in TNEP. Furthermore, due to the peak distribution characteristics of renewable generation and heavy investment in transmission, the traditional TNEP, which caters to rated renewable power output, is usually uneconomic. To improve the economic efficiency, the multi-objective optimization is incorporated into the multi-scenario TNEP model, while the curtailment of renewable generation is considered as one of the optimization objectives. The solution framework applies a modified NSGA-II algorithm to obtain a set of Pareto optimal planning schemes with different levels of investment costs and renewable generation curtailments. Numerical results on the IEEE RTS-24 system demonstrated the robustness and effectiveness of the proposed approach.

  3. Convergence of hyperspherical adiabatic expansion for helium-like systems

    International Nuclear Information System (INIS)

    Abrashkevich, A.G.; Abrashkevich, D.G.; Pojda, V.Yu.; Vinitskij, S.I.; Kaschiev, M.S.; Puzynin, I.V.

    1988-01-01

    The convergence of hyperspherical adiabatic expansion has been studied numerically. The spectral problems arising after separation of variables are solved by the finite-difference and finite element methods. The energies of the ground and some doubly excited staes of a hydrogen ion are calculated in the six-channel approximation within the 10 -4 a.u. accuracy. Obtained results demonstrate a rapid convergence of the hyperspherical adiabatic expansion. 14 refs.; 5 tabs

  4. Optimal planning of integrated multi-energy systems

    DEFF Research Database (Denmark)

    van Beuzekom, I.; Gibescu, M.; Pinson, Pierre

    2017-01-01

    In this paper, a mathematical approach for the optimal planning of integrated energy systems is proposed. In order to address the challenges of future, RES-dominated energy systems, the model deliberates between the expansion of traditional energy infrastructures, the integration...... and sustainability goals for 2030 and 2045. Optimal green- and brownfield designs for a district's future integrated energy system are compared using a one-step, as well as a two-step planning approach. As expected, the greenfield designs are more cost efficient, as their results are not constrained by the existing...

  5. How to Plan Ventilation Systems.

    Science.gov (United States)

    Clarke, John H.

    1963-01-01

    Ventilation systems for factory safety demand careful planning. The increased heat loads and new processes of industry have introduced complex ventilation problems in--(1) ventilation supply, (2) duct work design, (3) space requirements, (4) hood face velocities, (5) discharge stacks, and (6) building eddies. This article describes and diagrams…

  6. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    Energy Technology Data Exchange (ETDEWEB)

    Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.

    2013-01-01

    This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.

  7. Optimal expansion of a drinking water infrastructure system with respect to carbon footprint, cost-effectiveness and water demand.

    Science.gov (United States)

    Chang, Ni-Bin; Qi, Cheng; Yang, Y Jeffrey

    2012-11-15

    Urban water infrastructure expansion requires careful long-term planning to reduce the risk from climate change during periods of both economic boom and recession. As part of the adaptation management strategies, capacity expansion in concert with other management alternatives responding to the population dynamics, ecological conservation, and water management policies should be systematically examined to balance the water supply and demand temporally and spatially with different scales. To mitigate the climate change impact, this practical implementation often requires a multiobjective decision analysis that introduces economic efficiencies and carbon-footprint matrices simultaneously. The optimal expansion strategies for a typical water infrastructure system in South Florida demonstrate the essence of the new philosophy. Within our case study, the multiobjective modeling framework uniquely features an integrated evaluation of transboundary surface and groundwater resources and quantitatively assesses the interdependencies among drinking water supply, wastewater reuse, and irrigation water permit transfer as the management options expand throughout varying dimensions. With the aid of a multistage planning methodology over the partitioned time horizon, such a systems analysis has resulted in a full-scale screening and sequencing of multiple competing objectives across a suite of management strategies. These strategies that prioritize 20 options provide a possible expansion schedule over the next 20 years that improve water infrastructure resilience and at low life-cycle costs. The proposed method is transformative to other applications of similar water infrastructure systems elsewhere in the world. Copyright © 2012 Elsevier Ltd. All rights reserved.

  8. Transmission system planning in Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Barrie, D; Macedo, F X; Mcconnach, J S [Ontario Hydro, Toronto, ON (Canada)

    1994-12-31

    In recent years, new and modified approaches to planning the large transmission system that serves the province of Ontario, Canada, have been necessary to accommodate the rapidly changing planning environment including slower uncertain growth, ageing of facilities, integration of demand side management and non utility generation options, increased competitiveness, increased financial stresses and affordable constraints. This paper describes some of the new and modified approaches and tools that have been adopted or are being developed by Ontario Hydro to cope with this changing environment. (author) 9 refs., 4 figs.

  9. Power system capacity expansion planning model considering carbon emissions constraints

    Directory of Open Access Journals (Sweden)

    Diego Adolfo Mejía Giraldo

    2012-01-01

    Full Text Available Este artículo presenta un modelo de planeamiento de expansión de la capacidad de sistemas de potencia considerando restricciones en emisiones de carbono. Además de los aspectos técnicos y económicos considerados usualmente en el proceso de planeamiento, se consideran dos políticas ambientales que consisten en el cobro de un impuesto y un límite anual a las emisiones de dióxido de carbono (CO2. Adicionalmente se ha incluido el retiro gradual de las plantas de generación ineficientes. Este abordaje garantiza una producción de electricidad más limpia en el sistema expandido a un costo relativamente bajo. El modelo propuesto considera la red de transmisión y es aplicado a un sistema de potencia de prueba de 4 regiones y a uno de 11 regiones para un horizonte de planeación de 20 años. Los resultados muestran decisiones de inversión prácticas en términos de sostenibilidad y costos.

  10. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  11. A new dynamic system suggested for earth expansion

    International Nuclear Information System (INIS)

    Fitzpatrick, J.

    1972-01-01

    It is here suggested that there may have been much more radioactive materials in the deep interior of the earth than bitherto supposed. Trapped heat being generated in the interior would provide a mechanism for earth expansion. An assumption of heat generation in the deep interior of the earth of the order of 0,5 X 10-13 calories per second, per cubic centimeter, would provide sufficient thermal expansion to account for approximately 0.1 mm. change in the radius of the earth per year

  12. Breast Reconstruction after a Bilateral Mastectomy Using the BRAVA Expansion System and Fat Grafting

    Directory of Open Access Journals (Sweden)

    Ondrej Mestak, MD

    2013-11-01

    Full Text Available Summary: Fat graft breast reconstruction following a mastectomy is always limited by the size of the skin envelope, which affects the amount of graft that can be injected in 1 session. Because the fat graft naturally resorbs in all patients, several sessions of fat grafting are necessary. BRAVA’s negative pressure causes a “reverse” expansion of the skin envelope, thus permitting more space for the fat graft. This allows decreasing number of required procedures for an adequate breast reconstruction. We operated on a 38-year-old patient 4 years after bilateral mastectomy without irradiation for breast cancer. Before the procedure, the patient was instructed to wear the BRAVA system for 12 hours daily for 2 months before the first session, at all times between the sessions and for 1 month following the last fat grafting session. We performed 3 fat grafting sessions, as planned. Altogether, we injected 840 cm3 of fat on the right side and 790 cm3 of fat on the left side. Four months after the last operation, the patient was very satisfied with her new breasts. The breasts were soft, with good sensation and a natural feel. Using the BRAVA external expansion system for the enhancement of fat grafting is a suitable technique for breast reconstruction after a mastectomy. This technique produces soft and natural feeling breasts in fewer operative sessions, with a minimal risk of complications. Patient compliance, however, is greatly needed to achieve the desired results.

  13. Planning for Online Education: A Systems Model

    Science.gov (United States)

    Picciano, Anthony G.

    2015-01-01

    The purpose of this article is to revisit the basic principles of technology planning as applied to online education initiatives. While not meant to be an exhaustive treatment of the topic, the article is timely because many colleges and universities are considering the development and expansion of online education as part of their planning…

  14. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  15. Experimental approach of plasma supersonic expansion physics and of Hall effect propulsion systems

    International Nuclear Information System (INIS)

    Mazouffre, Stephane

    2009-01-01

    This report for accreditation to supervise research (HDR) proposes a synthesis of scientific and research works performed by the author during about ten years. Thus, a first part addresses studies on plasma rarefied supersonic flows: expansion through a sonic hole and through a Laval nozzle. The next part addresses the study of plasma propulsion for spacecraft, and more particularly electric propulsion based on the Hall effect: phenomena of ionic and atomic transport, characteristics of the electric field, energy deposition on walls, basic scale laws, related works, hybrid Hall-RF propulsion systems. The third part presents perspectives and projects related to propulsion by Hall effect (research topics, planned researches, a European project on high power, hybrid Hall-RF propulsion) and to ions-ions plasma (the PEGASES concept, the NExET test installation, RF source of negative ions and magnetic trap)

  16. Multi-Criteria Analyses of Urban Planning for City Expansion: A Case Study of Zamora, Spain

    Directory of Open Access Journals (Sweden)

    Marco Criado

    2017-10-01

    Full Text Available This study has established a methodology to determine the most environmentally suitable area for the expansion of Zamora (Spain using geographic information system (GIS technology. The objective was to develop a GIS-based methodology for the identification of urban peripheral areas that are suitable for the accommodation of new buildings and services, that are compliant with environmental criteria, and that guarantee an adequate quality of life for the future population such that extra construction costs are avoided. The methodological core is based on two multi-criteria analyses (MCAs: MCA-1 determines areas suitable for building—the most environmentally sustainable areas that do not present risks or discomforts to the population—by analyzing the restrictive factors; MCA-2 takes the sectors that received a favorable evaluation in MCA-1, determines which of those have a lower economic overhead for construction, and analyzes the different conditioning criteria related to their pre-existing infrastructures. Finally, the location of the sectors is determined by a decision factor that satisfies some strategic need of the municipality.

  17. A multiyear DG-incorporated framework for expansion planning of distribution networks using binary chaotic shark smell optimization algorithm

    International Nuclear Information System (INIS)

    Ahmadigorji, Masoud; Amjady, Nima

    2016-01-01

    In this paper, a new model for MEPDN (multiyear expansion planning of distribution networks) is proposed. By solving this model, the optimal expansion scheme of primary (i.e. medium voltage) distribution network including the reinforcement pattern of primary feeders as well as location and size of DG (distributed generators) during an ascertained planning period is determined. Furthermore, the time-based feature of proposed model allows it to specify the investments/reinforcements time (i.e. year). Moreover, a minimum load shedding-based analytical approach for optimizing the network's reliability is introduced. The associated objective function of proposed model is minimizing the total investment and operation costs. To solve the formulated MEPDN model as a complex multi-dimensional optimization problem, a new evolutionary algorithm-based solution method called BCSSO (Binary Chaotic Shark Smell Optimization) is presented. The effectiveness of the proposed MEPDN model and solution approach is illustrated by applying them on two widely-used test cases including 12-bus and 33-bus distribution network and comparing the acquired results with the results of other solution methods. - Highlights: • A multiyear expansion planning model for distribution network is presented. • A new evolutionary algorithm-based solution approach is proposed. • A minimum load shedding-based analytical method for EENS minimization is suggested. • The efficacy of the proposed solution approach is broadly investigated.

  18. The affordable care act and family planning services: the effect of optional medicaid expansion on safety net programs.

    Science.gov (United States)

    Lanese, Bethany G; Oglesby, Willie H

    2016-01-01

    Title X of the Public Health Service Act provides funding for a range of reproductive health services, with a priority given to low-income persons. Now that many of these services are provided to larger numbers of people with low-income since the passage of the Affordable Care Act and Medicaid expansion, questions remain on the continued need for the Title X program. The current project highlights the importance of these safety net programs. To help inform this policy issue, research was conducted to examine the revenue and service changes for Title X per state and compare those findings to the states' Medicaid expansion and demographics. The dataset include publicly available data from 2013 and 2014 Family Planning Annual Reports (FPAR). Paired samples differences of means t-tests were then used to compare the means of family planning participation rates for 2013 and 2014 across the different categories for Medicaid expansion states and non-expansion states. The ACA has had an impact on Title X services, but the link is not as direct as previously thought. The findings indicate that all states' Title X funded clinics lost revenue; however, expansion states fared better than non-expansion states. While the general statements from the FPAR National surveys certainly are supported in that Title X providers have decreased in number and scope of services, which has led to the decrease in total clients, these variations are not evenly applied across the states. The ACA has very likely had an impact on Title X services, but the link is not as obvious as previously thought. Title X funded clinics have helped increase access to health insurance at a greater rate in expansion states than non-expansion states. There was much concern from advocates that with the projected increased revenue from Medicaid and private insurance, that Title X programs could be deemed unnecessary. However, this revenue increase has yet to actually pan out. Title X still helps fill a much needed

  19. Multi-objective and multi-criteria optimization for power generation expansion planning with CO2 mitigation in Thailand

    Directory of Open Access Journals (Sweden)

    Kamphol Promjiraprawat

    2013-06-01

    Full Text Available In power generation expansion planning, electric utilities have encountered the major challenge of environmental awareness whilst being concerned with budgetary burdens. The approach for selecting generating technologies should depend on economic and environmental constraint as well as externalities. Thus, the multi-objective optimization becomes a more attractive approach. This paper presents a hybrid framework of multi-objective optimization and multi-criteria decision making to solve power generation expansion planning problems in Thailand. In this paper, CO2 emissions and external cost are modeled as a multi-objective optimization problem. Then the analytic hierarchy process is utilized to determine thecompromised solution. For carbon capture and storage technology, CO2 emissions can be mitigated by 74.7% from the least cost plan and leads to the reduction of the external cost of around 500 billion US dollars over the planning horizon. Results indicate that the proposed approach provides optimum cost-related CO2 mitigation plan as well as external cost.

  20. Pilot chargeback system program plan

    International Nuclear Information System (INIS)

    Smith, P.

    1997-03-01

    This planning document outlines the steps necessary to develop, test, evaluate, and potentially implement a pilot chargeback system at the Idaho National Engineering and Environmental Laboratory for the treatment, storage, and disposal of current waste. This pilot program will demonstrate one system that can be used to charge onsite generators for the treatment and disposal of low-level radioactive waste. In FY 1997, mock billings will begin by July 15, 1997. Assuming approvals are received to do so, FY 1998 activities will include modifying the associated automated systems, testing and evaluating system performance, and estimating the amount generators will spend for waste storage, treatment, and disposal in FY 1999. If the program is fully implemented in FY 1999, generators will pay actual, automated bills for waste management services from funds transferred to their budgets from Environmental Management

  1. Unitary pole approximations and expansions in few-body systems

    International Nuclear Information System (INIS)

    Casel, A.; Haberzettl, H.; Sandhas, W.

    1982-01-01

    The unitary pole approximations or expansions of the two-body subsystem operators are well known, and particularly efficient and practical, methods to reduce the three-body problem to an effective two-body theory. In the present investigation we develop generalizations of these approximation techniques to the subsystem amplitudes of problems with higher particle numbers. They are based on the expansion of effective potentials which, in contrast to the genuine two-body interactions, are now energy dependent. Despite this feature our generalizations require only energy independent form factors, thus preserving one of the essential advantages of the genuine two-body approach. The application of these techniques to the four-body case is discussed in detail

  2. Isobaric expansion coefficient and isothermal compressibility for a finite-size ideal Fermi gas system

    International Nuclear Information System (INIS)

    Su, Guozhen; Chen, Liwei; Chen, Jincan

    2014-01-01

    Due to quantum size effects (QSEs), the isobaric thermal expansion coefficient and isothermal compressibility well defined for macroscopic systems are invalid for finite-size systems. The two parameters are redefined and calculated for a finite-size ideal Fermi gas confined in a rectangular container. It is found that the isobaric thermal expansion coefficient and isothermal compressibility are generally anisotropic, i.e., they are generally different in different directions. Moreover, it is found the thermal expansion coefficient may be negative in some directions under the condition that the pressures in all directions are kept constant. - Highlights: • Isobaric thermal expansion coefficient and isothermal compressibility are redefined. • The two parameters are calculated for a finite-size ideal Fermi gas. • The two parameters are generally anisotropic for a finite-size system. • Isobaric thermal expansion coefficient may be negative in some directions

  3. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  4. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  5. System expansion for handling co-products in LCA of sugar cane bio-energy systems

    DEFF Research Database (Denmark)

    Nguyen, T Lan T; Hermansen, John Erik

    2012-01-01

    This study aims to establish a procedure for handling co-products in life cycle assessment (LCA) of a typical sugar cane system. The procedure is essential for environmental assessment of ethanol from molasses, a co-product of sugar which has long been used mainly for feed. We compare system...... expansion and two allocation procedures for estimating greenhouse gas (GHG) emissions of molasses ethanol. As seen from our results, system expansion yields the highest estimate among the three. However, no matter which procedure is used, a significant reduction of emissions from the fuel stage...... in the abatement scenario, which assumes implementation of substituting bioenergy for fossil-based energy to reduce GHG emissions, combined with a negligible level of emissions from the use stage, keeps the estimate of ethanol life cycle GHG emissions below that of gasoline. Pointing out that indirect land use...

  6. Long expansion planning of electrical power availability in Brazil under the real options theoretical approach; Planejamento de longo prazo da expansao da oferta de energia eletrica no Brasil sob uma perspectiva da teoria das opcoes reais

    Energy Technology Data Exchange (ETDEWEB)

    Marreco, Juliana de Moraes

    2007-05-15

    This thesis considers uncertainty on the long term generation expansion planning in the Brazilian Electric System, under a Real Options Approach . First, Real Options Theory is used to demonstrate the importance of thermo power plants insertion in Brazil, through a flexibility valuation on hydrothermal system. This is the first objective of this thesis. In the second part a Real Options Model is proposed to support long term expansion studies, based in a levelized costs analysis. The adequacy of proposed models to real problem is illustrated by a case study of the Brazilian Power System. The results show the importance of the energetic matrix diversification on the Long Term Planning. In the expansion model proposed, results are in favor of higher participation of biomass, nuclear power and coal in Brazilian electricity generation matrix. (author)

  7. A System for Planning Ahead

    Science.gov (United States)

    2002-01-01

    A software system that uses artificial intelligence techniques to help with complex Space Shuttle scheduling at Kennedy Space Center is commercially available. Stottler Henke Associates, Inc.(SHAI), is marketing its automatic scheduling system, the Automated Manifest Planner (AMP), to industries that must plan and project changes many different times before the tasks are executed. The system creates optimal schedules while reducing manpower costs. Using information entered into the system by expert planners, the system automatically makes scheduling decisions based upon resource limitations and other constraints. It provides a constraint authoring system for adding other constraints to the scheduling process as needed. AMP is adaptable to assist with a variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction. AMP can benefit vehicle assembly plants, batch processing plants, semiconductor manufacturing, printing and textiles, surface and underground mining operations, and maintenance shops. For most of SHAI's commercial sales, the company obtains a service contract to customize AMP to a specific domain and then issues the customer a user license.

  8. Improving Power System Modeling. A Tool to Link Capacity Expansion and Production Cost Models

    Energy Technology Data Exchange (ETDEWEB)

    Diakov, Victor [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cole, Wesley [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sullivan, Patrick [National Renewable Energy Lab. (NREL), Golden, CO (United States); Brinkman, Gregory [National Renewable Energy Lab. (NREL), Golden, CO (United States); Margolis, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-11-01

    Capacity expansion models (CEM) provide a high-level long-term view at the prospects of the evolving power system. In simulating the possibilities of long-term capacity expansion, it is important to maintain the viability of power system operation in the short-term (daily, hourly and sub-hourly) scales. Production-cost models (PCM) simulate routine power system operation on these shorter time scales using detailed load, transmission and generation fleet data by minimizing production costs and following reliability requirements. When based on CEM 'predictions' about generating unit retirements and buildup, PCM provide more detailed simulation for the short-term system operation and, consequently, may confirm the validity of capacity expansion predictions. Further, production cost model simulations of a system that is based on capacity expansion model solution are 'evolutionary' sound: the generator mix is the result of logical sequence of unit retirement and buildup resulting from policy and incentives. The above has motivated us to bridge CEM with PCM by building a capacity expansion - to - production cost model Linking Tool (CEPCoLT). The Linking Tool is built to onset capacity expansion model prescriptions onto production cost model inputs. NREL's ReEDS and Energy Examplar's PLEXOS are the capacity expansion and the production cost models, respectively. Via the Linking Tool, PLEXOS provides details of operation for the regionally-defined ReEDS scenarios.

  9. Measurement of Linear Coefficient of Thermal Expansion and Temperature-Dependent Refractive Index Using Interferometric System

    Science.gov (United States)

    Corsetti, James A.; Green, William E.; Ellis, Jonathan D.; Schmidt, Greg R.; Moore, Duncan T.

    2017-01-01

    A system combining an interferometer with an environmental chamber for measuring both coefficient of thermal expansion (CTE) and temperature-dependent refractive index (dn/dT) simultaneously is presented. The operation and measurement results of this instrument are discussed.

  10. Long-Term Reserve Expansion of Power Systems With High Wind Power Penetration Using Universal Generating Function Methods

    DEFF Research Database (Denmark)

    DING, YI; Wang, Peng; Goel, Lalit

    2010-01-01

    from long term planning point of view utilizing universal generating function (UGF) methods. The reliability models of wind farms and conventional generators are represented as the correspondin UGFs and the special operators for these UGFs are defined to evaluate the customer and the system...... reliabilities. The effect of transmission network on customer reliabilities is also considered in the system UGF. The power output models of wind turbine generators in a wind farm considering wind speed correlation and un-correlation are developed, respectively. A reliability-based reserve expansion method...

  11. INFORMATION SYSTEM STRATEGIC PLANNING WITH ENTERPRISE ARCHITECTURE PLANNING

    Directory of Open Access Journals (Sweden)

    Lola Yorita Astri

    2013-05-01

    Full Text Available An integrated information system is needed in an enterprise to support businessprocesses run by an enterprise. Therefore, to develop information system can use enterprisearchitecture approach which can define strategic planning of enterprise information system. SMPNegeri 1 Jambi can be viewed as an enterprise because there are entities that should be managedthrough an integrated information system. Since there has been no unification of different elementsin a unity yet, enterprise architecture model using Enterprise Architecture Planning (EAP isneeded which will obtain strategic planning of enterprise information system in SMP Negeri 1Jambi. The goal of strategic planning of information system with Enterprise Architecture Planning(EAP is to define primary activities run by SMP Negeri 1 Jambi and support activities supportingprimary activities. They can be used as a basis for making data architecture which is the entities ofapplication architecture. At last, technology architecture is designed to describe technology neededto provide environment for data application. The plan of implementation is the activity plan madeto implemented architectures by enterprise.

  12. Converting Hangar High Expansion Foam Systems to Prevent Cockpit Damage: Full-Scale Validation Tests

    Science.gov (United States)

    2017-09-01

    AFCEC-CO-TY-TR-2018-0001 CONVERTING HANGAR HIGH EXPANSION FOAM SYSTEMS TO PREVENT COCKPIT DAMAGE: FULL-SCALE VALIDATION TESTS Gerard G...manufacturer, or otherwise does not constitute or imply its endorsement, recommendation , or approval by the United States Air Force. The views and...09-2017 Final Test Report May 2017 Converting Hangar High Expansion Foam Systems to Prevent Cockpit Damage: Full-Scale Validation Tests N00173-15-D

  13. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Science.gov (United States)

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  14. Incorporating a multi-criteria decision procedure into the combined dynamic programming/production simulation algorithm for generation expansion planning

    International Nuclear Information System (INIS)

    Yang, H.T.; Chen, S.L.

    1989-01-01

    A multi-objective optimization approach to generation expansion planning is presented. The approach is designed by adding a new multi-criteria decision (MCD) procedure to the conventional algorithm which combines dynamic programming with production simulation method. The MCD procedure can help decision makers weight the relative importance of multiple attributes associated with the decision alternatives, and find the near-best compromise solution efficiently at each optimization step of the conventional algorithm. Practical application of proposed approach to feasibility evaluation of the fourth nuclear power plant of Tawian is also presented, demonstrating the effectiveness and limitations of the approach

  15. Extended gamma sources modelling using multipole expansion: Application to the Tunisian gamma source load planning

    International Nuclear Information System (INIS)

    Loussaief, Abdelkader

    2007-01-01

    In this work we extend the use of multipole moments expansion to the case of inner radiation fields. A series expansion of the photon flux was established. The main advantage of this approach is that it offers the opportunity to treat both inner and external radiation field cases. We determined the expression of the inner multipole moments in both spherical harmonics and in cartesian coordinates. As an application we applied the analytical model to a radiation facility used for small target irradiation. Theoretical, experimental and simulation studies were performed, in air and in a product, and good agreement was reached.Conventional dose distribution study for gamma irradiation facility involves the use of isodose maps. The establishment of these maps requires the measurement of the absorbed dose in many points, which makes the task expensive experimentally and very long by simulation. However, a lack of points of measurement can distort the dose distribution cartography. To overcome these problems, we present in this paper a mathematical method to describe the dose distribution in air. This method is based on the multipole expansion in spherical harmonics of the photon flux emitted by the gamma source. The determination of the multipole coefficients of this development allows the modeling of the radiation field around the gamma source. (Author)

  16. The Stevens Integrated Maritime Surveillance Forecast System: Expansion and Enhancement

    National Research Council Canada - National Science Library

    Bruno, Michael S; Blumberg, Alan F

    2006-01-01

    .... In the long-term, the observation and modeling systems will be linked in a unique fashion, whereby the model forecast system will be enhanced by data assimilation, and the observing system will...

  17. Geographic information system planning and monitoring best ...

    African Journals Online (AJOL)

    Poor urbanization policies, inefficient planning and monitoring technologies are evident. The consequences include some of the worst types of environmental hazards. Best urbanization practices require integrated planning approaches that result in environmental conservation. Geographic Information systems (GIS) provide ...

  18. Expansion of the data acquisition system for the 20 MV tandem accelerator

    International Nuclear Information System (INIS)

    Tomita, Yoshiaki

    1981-02-01

    This report describes an expansion of the program of the data acquisition system for the 20 MV tandem accelerator. By the present expansion it became possible to change the accuisition mode or to use non-standard CAMAC modules with partial modification of the program according to well defined prescriptions. The modification can be made by writing microprograms for the MBD or appending subroutines for the reduced spectra in the LIST mode data acquisition. The new program can handle up to 32 ADC's in the standard LIST mode data acquisition. The present expansion aimed to increase the flexibility in data acquisition. It can also be applied to control experimental devices. (author)

  19. SCANPLAN planning system for medical accelerators

    International Nuclear Information System (INIS)

    Ovsyannikov, D.A.; Sergeev, S.L.; Stuchenkov, A.B.; Vorogushin, M.F.; Tikhomirov, A.S.; Shishov, V.A.

    2001-01-01

    The SCANPLAN automatic system for planning and documentation of every treatment of the photon radiotherapy is described. The system is oriented at the operating systems Windows 98, 2000 and is developed with using the Visual Studio 6.0 technology. This system consists of the following components: planning unit, module for preparation of anatomical information, data base and patient catalogs [ru

  20. Construction of a remote radiotherapy planning system

    International Nuclear Information System (INIS)

    Ogawa, Yoshihiro; Nemoto, Kenji; Takahashi, Chiaki; Takai, Yoshihiro; Yamada, Shogo; Seiji, Hiromasa; Sasaki, Kazuya

    2005-01-01

    We constructed a remote radiotherapy planning system, and we examined the usefulness of and faults in our system in this study. Two identical radiotherapy planning systems, one installed at our institution and the other installed at an affiliated hospital, were used for radiotherapy planning. The two systems were connected by a wide area network (WAN), using a leased line. Beam data for the linear accelerator at the affiliated hospital were installed in the two systems. During the period from December 2001 to December 2002, 43 remote radiotherapy plans were made using this system. Data were transmitted using a file transfer protocol (FTP) software program. The 43 radiotherapy plans examined in this study consisted of 13 ordinary radiotherapy plans, 28 radiotherapy plans sent to provide assistance for medical residents, and 2 radiotherapy plans for emergency cases. There were ten minor planning changes made in radiotherapy plans sent to provide assistance for medical residents. Our remote radiotherapy planning system based on WAN using a leased line is useful for remote radiotherapy, with advantages for both radiation oncologists and medical residents. (author)

  1. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    Certa, P.J.; Kirkbride, R.A.; Hohl, T.M.; Empey, P.A.; Wells, M.N.

    2009-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  2. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and

  3. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  4. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    CERTA PJ

    2008-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  5. A multistage framework for reliability-based distribution expansion planning considering distributed generations by a self-adaptive global-based harmony search algorithm

    International Nuclear Information System (INIS)

    Shivaie, Mojtaba; Ameli, Mohammad T.; Sepasian, Mohammad S.; Weinsier, Philip D.; Vahidinasab, Vahid

    2015-01-01

    In this paper, the authors present a new multistage framework for reliability-based Distribution Expansion Planning (DEP) in which expansion options are a reinforcement and/or installation of substations, feeders, and Distributed Generations (DGs). The proposed framework takes into account not only costs associated with investment, maintenance, and operation, but also expected customer interruption cost in the optimization as four problem objectives. At the same time, operational restrictions, Kirchhoff's laws, radial structure limitation, voltage limits, and capital expenditure budget restriction are considered as problem constraints. The proposed model is a non-convex optimization problem having a non-linear, mixed-integer nature. Hence, a hybrid Self-adaptive Global-based Harmony Search Algorithm (SGHSA) and Optimal Power Flow (OPF) were used and followed by a fuzzy satisfying method in order to obtain the final optimal solution. The SGHSA is a recently developed optimization algorithm which imitates the music improvisation process. In this process, the harmonists improvise their instrument pitches, searching for the perfect state of harmony. The planning methodology was demonstrated on the 27-node, 13.8-kV test system in order to demonstrate the feasibility and capability of the proposed model. Simulation results illustrated the sufficiency and profitableness of the newly developed framework, when compared with other methods. - Highlights: • A new multistage framework is presented for reliability-based DEP problem. • In this paper, DGs are considered as an expansion option to increase the flexibility of the proposed model. • In this paper, effective factors of DEP problem are incorporated as a multi-objective model. • In this paper, three new algorithms HSA, IHSA and SGHSA are proposed. • Results obtained by the proposed SGHSA algorithm are better than others

  6. Rapid Automated Mission Planning System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed innovation is an automated UAS mission planning system that will rapidly identify emergency (contingency) landing sites, manage contingency routing, and...

  7. System i Disaster Recovery Planning

    CERN Document Server

    Dolewski, Richard

    2008-01-01

    Mapping out all the preparations necessary for an effective disaster recovery plan and its safeguard-a continuous maintenance program-this guide is aimed at IT managers of small and medium businesses. The opening section covers the initial steps of auditing vulnerability, ranking essential IT functions, and reviewing the storage of tape backups, with the following discussion focused on the elements of the plan itself. The plan includes a mission statement, a definition of disaster, the assignment of staff to teams, methods of compensating for human error, and standards for documenting the step

  8. Optimal Expansion of a Drinking Water Infrastructure System with Respect to Carbon Footprint, Cost Effectiveness and Water Demand

    Science.gov (United States)

    Urban water infrastructure requires careful long-term expansion planning to reduce the risk from climate change during both the periods of economic boom and recession. As part of the adaptation management strategies, capacity expansion in concert with other management alternativ...

  9. Radwaste treatment complex. DRAWMACS planned maintenance system

    International Nuclear Information System (INIS)

    Keel, A.J.

    1992-07-01

    This document describes the operation of the Planned Maintenance System for the Radwaste Treatment Complex. The Planned Maintenance System forms part of the Decommissioning and Radwaste Management Computer System (DRAWMACS). Further detailed information about the data structure of the system is contained in Database Design for the DRAWMACS Planned Maintenance System (AEA-D and R-0285, 2nd issue, 25th February 1992). Information for other components of DRAWMACS is contained in Basic User Guide for the Radwaste Treatment Plant Computer System (AEA-D and R-0019, July 1990). (author)

  10. Investigation of droplet nucleation in CCS relevant systems – design and testing of the expansion chamber

    Directory of Open Access Journals (Sweden)

    Čenský Miroslav

    2018-01-01

    Full Text Available A unique in-house designed experimental apparatus for investigation of nucleation of droplets in CCS relevant systems is being developed by the present team. The apparatus allows simulating various processes relevant to CCS technologies. Gaseous mixtures with CO2 are prepared in a Mixture Preparation Device (MPD based on accurate adjustment of flow rates of individual components [EPJ Web of Conferences 143, 02140 (2017]. The mixture then flows into an expansion chamber, where it undergoes a rapid adiabatic expansion. As a consequence of adiabatic cooling, the mixture becomes supersaturated and nucleation and simultaneous growth of droplets occurs. In this study, we describe the design and testing of the expansion part of the experimental setup. The rapid expansion was realized using two valve systems, one for low pressures (up to 0.7 MPa and the other for high pressures (up to 10 MPa. A challenge for a proper design of the expansion system is avoiding acoustic oscillations. These can occur either in the mode of Helmholtz resonator, where the compressible gas in the chamber acts as a spring and the rapidly moving gas in the valve system as a mass, or in the “flute” mode, where acoustic waves are generated in a long outlet tubing.

  11. Investigation of droplet nucleation in CCS relevant systems - design and testing of the expansion chamber

    Science.gov (United States)

    Čenský, Miroslav; Hrubý, Jan; Vinš, Václav; Hykl, Jiří; Šmíd, Bohuslav

    2018-06-01

    A unique in-house designed experimental apparatus for investigation of nucleation of droplets in CCS relevant systems is being developed by the present team. The apparatus allows simulating various processes relevant to CCS technologies. Gaseous mixtures with CO2 are prepared in a Mixture Preparation Device (MPD) based on accurate adjustment of flow rates of individual components [EPJ Web of Conferences 143, 02140 (2017)]. The mixture then flows into an expansion chamber, where it undergoes a rapid adiabatic expansion. As a consequence of adiabatic cooling, the mixture becomes supersaturated and nucleation and simultaneous growth of droplets occurs. In this study, we describe the design and testing of the expansion part of the experimental setup. The rapid expansion was realized using two valve systems, one for low pressures (up to 0.7 MPa) and the other for high pressures (up to 10 MPa). A challenge for a proper design of the expansion system is avoiding acoustic oscillations. These can occur either in the mode of Helmholtz resonator, where the compressible gas in the chamber acts as a spring and the rapidly moving gas in the valve system as a mass, or in the "flute" mode, where acoustic waves are generated in a long outlet tubing.

  12. System size expansion using Feynman rules and diagrams

    NARCIS (Netherlands)

    Thomas, P.; Fleck, C.; Grima, R.; Popovic, N.

    2014-01-01

    Few analytical methods exist for quantitative studies of large fluctuations in stochastic systems. In this article, we develop a simple diagrammatic approach to the chemical master equation that allows us to calculate multi-time correlation functions which are accurate to any desired order in van

  13. Planning and design of information systems

    CERN Document Server

    Blokdijk, André

    1991-01-01

    Planning and Design of Information Systems provides a theoretical base and a practical method of executing the planning of computerized information systems, and the planning and design of individual applications. The book is organized into five parts, covering the non-technical and nonimplementational part of information systems planning, design, and development. Part I gives the theoretical base for the subsequent parts of the book. It discusses modeling, techniques, notations, boundaries, quality issues and aspects, and decomposition techniques and problems. Part II discusses the needs, prob

  14. Master plan envisions multi-billion-dollar expansion of Vietnam's electricity monopoly

    International Nuclear Information System (INIS)

    2001-12-01

    Massive investment in Vietnam's electricity monopoly by Western aid and export credit agencies form part of the ten-year master plan developed for Vietnam. Central planning and political patronage, instead of market assessments and customer choice form the basis for monopoly investments in a centralized grid linking big hydro, gas, coal, and nuclear power projects. Western aid agencies might effectively crowd out viable private-sector energy investments by financing power projects considered too large and risky by the private sector. These investments by Western aid agencies would assist in winning contracts for favoured exporters of engineering services and equipment. It would be a breeding ground for corruption in Vietnam if market discipline, public oversight, and enforceable property rights are not present in the face of power sector aid. There is a real possibility that damages to the environment could result from electricity investments, and some communities might be victimized, electricity costs might increase, the indebtedness level of the population might increase

  15. Tank waste remediation system environmental program plan

    Energy Technology Data Exchange (ETDEWEB)

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  16. Tank waste remediation system environmental program plan

    International Nuclear Information System (INIS)

    Borneman, L.E.

    1998-01-01

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996)

  17. A SWOT analysis of Planning Support Systems

    NARCIS (Netherlands)

    Vonk, G.; Geertman, S.; Schot, P.P.

    2007-01-01

    Insight into the strengths, weaknesses, opportunities, and threats (SWOT) of planning support systems (PSS) is fragmented between users and system developers. The lack of combined insights blocks development in the right direction and makes potential users hesitant to apply PSS in planning. This

  18. Long vigil in Athabasca oil sands culminates in rapid expansion plans

    Energy Technology Data Exchange (ETDEWEB)

    1974-05-01

    Great Canadian Oil Sands Ltd. needs to earn $40 million or more per year to get a reasonable return on the investment, vice president and general manager R.D. Humphreys told delegates at the Petroleum Accountants Society of W. Canada annual conference at Jasper Park Lodge. The conference then was ''the Alberta Oil Sands.'' Sun Oil Co. has taken no return yet, but has paid off the loans and taken shares in return so it owns nearly all the equity capital. The operation is not really breaking even at present, but should improve because GCOS is getting the full effect of the oil price increase under the original royalty agreement with the Alberta government. It is hoped that this will enable the company to recoup an accumulated deficit of more than $90 million. Money is the biggest problem for the current expansion designed to raise production to the authorized 65,000 bpd. Manpower is second and delivery of materials third. There is a lead time of 15 to 18 mo. on critical materials. Over the long term, tailings disposal is the greatest single problem facing all oil sands operators.

  19. Optimal Investment Planning of Bulk Energy Storage Systems

    Directory of Open Access Journals (Sweden)

    Dina Khastieva

    2018-02-01

    Full Text Available Many countries have the ambition to increase the share of renewable sources in electricity generation. However, continuously varying renewable sources, such as wind power or solar energy, require that the power system can manage the variability and uncertainty of the power generation. One solution to increase flexibility of the system is to use various forms of energy storage, which can provide flexibility to the system at different time ranges and smooth the effect of variability of the renewable generation. In this paper, we investigate three questions connected to investment planning of energy storage systems. First, how the existing flexibility in the system will affect the need for energy storage investments. Second, how presence of energy storage will affect renewable generation expansion and affect electricity prices. Third, who should be responsible for energy storage investments planning. This paper proposes to assess these questions through two different mathematical models. The first model is designed for centralized investment planning and the second model deals with a decentralized investment approach where a single independent profit maximizing utility is responsible for energy storage investments. The models have been applied in various case studies with different generation mixes and flexibility levels. The results show that energy storage system is beneficial for power system operation. However, additional regulation should be considered to achieve optimal investment and allocation of energy storage.

  20. Nonlocal Symmetries, Consistent Riccati Expansion, and Analytical Solutions of the Variant Boussinesq System

    Science.gov (United States)

    Feng, Lian-Li; Tian, Shou-Fu; Zhang, Tian-Tian; Zhou, Jun

    2017-07-01

    Under investigation in this paper is the variant Boussinesq system, which describes the propagation of surface long wave towards two directions in a certain deep trough. With the help of the truncated Painlevé expansion, we construct its nonlocal symmetry, Bäcklund transformation, and Schwarzian form, respectively. The nonlocal symmetries can be localised to provide the corresponding nonlocal group, and finite symmetry transformations and similarity reductions are computed. Furthermore, we verify that the variant Boussinesq system is solvable via the consistent Riccati expansion (CRE). By considering the consistent tan-function expansion (CTE), which is a special form of CRE, the interaction solutions between soliton and cnoidal periodic wave are explicitly studied.

  1. Effect of volume expansion on systemic hemodynamics and central and arterial blood volume in cirrhosis

    DEFF Research Database (Denmark)

    Møller, S; Bendtsen, F; Henriksen, Jens Henrik Sahl

    1995-01-01

    , and arterial pressure were determined before and during a volume expansion induced by infusion of a hyperosmotic galactose solution. RESULTS: During volume expansion, the central and arterial blood volume increased significantly in patients with class A and controls, whereas no significant change was found...... in patients with either class B or class C. Conversely, the noncentral blood volume increased in patients with class B and C. In both patients and controls, the cardiac output increased and the systemic vascular resistance decreased, whereas the mean arterial blood pressure did not change significantly......BACKGROUND & AIMS: Systemic vasodilatation in cirrhosis may lead to hemodynamic alterations with reduced effective blood volume and decreased arterial blood pressure. This study investigates the response of acute volume expansion on hemodynamics and regional blood volumes in patients with cirrhosis...

  2. Postimplementation Planning and Organizational Structure of Enterprise Resource Planning Systems

    Science.gov (United States)

    Wilson, Charmaine V.

    2012-01-01

    Globalization, rapid technological changes, and competitive pressures have resulted in company leaders' worldwide adopting of enterprise resource planning (ERP) systems to improve productivity and business operations and reduce costs in the post-implementation phase. The research addressed organizational leaders' inability to optimize…

  3. Travel Times for Screening Mammography: Impact of Geographic Expansion by a Large Academic Health System.

    Science.gov (United States)

    Rosenkrantz, Andrew B; Liang, Yu; Duszak, Richard; Recht, Michael P

    2017-09-01

    This study aims to assess the impact of off-campus facility expansion by a large academic health system on patient travel times for screening mammography. Screening mammograms performed from 2013 to 2015 and associated patient demographics were identified using the NYU Langone Medical Center Enterprise Data Warehouse. During this time, the system's number of mammography facilities increased from 6 to 19, reflecting expansion beyond Manhattan throughout the New York metropolitan region. Geocoding software was used to estimate driving times from patients' homes to imaging facilities. For 147,566 screening mammograms, the mean estimated patient travel time was 19.9 ± 15.2 minutes. With facility expansion, travel times declined significantly (P travel times between such subgroups. However, travel times to pre-expansion facilities remained stable (initial: 26.8 ± 18.9 minutes, final: 26.7 ± 18.6 minutes). Among women undergoing mammography before and after expansion, travel times were shorter for the postexpansion mammogram in only 6.3%, but this rate varied significantly (all P travel burden and reduce travel time variation among sociodemographic populations. Nonetheless, existing patients strongly tend to return to established facilities despite potentially shorter travel time locations, suggesting strong site loyalty. Variation in travel times likely relates to various factors other than facility proximity. Copyright © 2017 The Association of University Radiologists. Published by Elsevier Inc. All rights reserved.

  4. Steam Generator Inspection Planning Expert System

    International Nuclear Information System (INIS)

    Rzasa, P.

    1987-01-01

    Applying Artificial Intelligence technology to steam generator non-destructive examination (NDE) can help identify high risk locations in steam generators and can aid in preparing technical specification compliant eddy current test (ECT) programs. A steam Generator Inspection Planning Expert System has been developed which can assist NDE or utility personnel in planning ECT programs. This system represents and processes its information using an object oriented declarative knowledge base, heuristic rules, and symbolic information processing, three artificial intelligence based techniques incorporated in the design. The output of the system is an automated generation of ECT programs. Used in an outage inspection, this system significantly reduced planning time

  5. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    Science.gov (United States)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  6. The DOE Office of Environmental Management International Cooperative Program: Current Status and Plans for Expansion

    International Nuclear Information System (INIS)

    Gerdes, Kurt D.; Han, Ana M.; Marra, James C.; Fox, Kevin M.; Peeler, David K.; Smith, Michael E.; Jannik, Gerald T.; Farfan, Eduardo B.; Kim, Dong-Sang; Vienna, John D.; Roach, Jay; Aloy, A.S.; Stefanovsky, S.V.; Bondarkov, M.D.; Lopukh, D.P.; Kim, Chenwoo

    2009-01-01

    The DOE-EM Office of Engineering and Technology is responsible for implementing EM's international cooperative program. The Office of Engineering and Technology's international efforts are aimed at supporting EM's mission of risk reduction and accelerated cleanup of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To do this, EM pursues collaborations with government organizations, educational institutions, and private industry to identify and develop technologies that can address the site cleanup needs of DOE. Currently, DOE-EM is performing collaborative work with researchers at the Khlopin Radium Institute (KRI) and the SIA Radon Institute in Russia and the Ukraine's International Radioecology Laboratory (IRL). Additionally, a task was recently completed with the Nuclear Engineering Technology Institute (NETEC) in South Korea. The objectives of these collaborations were to explore issues relating to high-level waste and to investigate technologies that could be leveraged to support EM site cleanup needs. In FY09, continued collaboration with the current partners is planned. Additionally, new research projects are being planned to expand the International Program. A collaborative project with Russian Electrotechnical University is underway to evaluate CCIM control and monitoring technologies. A Statement of Intent was recently signed between DOE-EM and the U.K. Nuclear Decommissioning Authority (NDA) to work cooperatively on areas of mutual interest. Under this umbrella, discussions were held with NDA representatives to identify potential areas for collaboration. Information and technical exchanges were identified as near-term actions to help meet the objectives of the Statement of Intent. Technical exchanges in identified areas are being pursued in FY09.

  7. Cast Off expansion plan by rapid improvement through Optimization tool design, Tool Parameters and using Six Sigma’s ECRS Technique

    Science.gov (United States)

    Gopalakrishnan, T.; Saravanan, R.

    2017-03-01

    Powerful management concepts step-up the quality of the product, time saving in producing the product thereby increase the production rate, improves tools and techniques, work culture, work place and employee motivation and morale. In this paper discussed about the case study of optimizing the tool design, tool parameters to cast off expansion plan according ECRS technique. The proposed designs and optimal tool parameters yielded best results and meet the customer demand without expansion plan. Hence the work yielded huge savings of money (direct and indirect cost), time and improved the motivation and more of employees significantly.

  8. A Series Expansion Approach to Risk Analysis of an Inventory System with Sourcing

    NARCIS (Netherlands)

    Berkhout, J.; Heidergott, B.F.

    2014-01-01

    In this paper we extend the series expansion approach for uni-chain Markov processes to a special case of finite multi-chains with possible transient states. We will show that multi-chain Markov models arise naturally in simple models such as a single item inventory system with sourcing, i.e., with

  9. Functional expansion for evolution operators in a system of many fermions with many conditions

    International Nuclear Information System (INIS)

    Barrios, S.C.

    1985-01-01

    We present a mean field expansion for many body system, using integral functionals. The problem is formulated as a initial conditions one and it is studied the effective dynamics of the body density with given initial conditions. (M.W.O.) [pt

  10. The Taylor-expansion method of moments for the particle system with bimodal distribution

    Directory of Open Access Journals (Sweden)

    Liu Yan-Hua

    2013-01-01

    Full Text Available This paper derives the multipoint Taylor expansion method of moments for the bimodal particle system. The collision effects are modeled by the internal and external coagulation terms. Simple theory and numerical tests are performed to prove the effect of the current model.

  11. Task planning systems with natural language interface

    International Nuclear Information System (INIS)

    Kambayashi, Shaw; Uenaka, Junji

    1989-12-01

    In this report, a natural language analyzer and two different task planning systems are described. In 1988, we have introduced a Japanese language analyzer named CS-PARSER for the input interface of the task planning system in the Human Acts Simulation Program (HASP). For the purpose of a high speed analysis, we have modified a dictionary system of the CS-PARSER by using C language description. It is found that the new dictionary system is very useful for a high speed analysis and an efficient maintenance of the dictionary. For the study of the task planning problem, we have modified a story generating system named Micro TALE-SPIN to generate a story written in Japanese sentences. We have also constructed a planning system with natural language interface by using the CS-PARSER. Task planning processes and related knowledge bases of these systems are explained. A concept design for a new task planning system will be also discussed from evaluations of above mentioned systems. (author)

  12. Multi area and multistage expansion-planning of electricity supply with sustainable energy development criteria: a multi objective model

    Energy Technology Data Exchange (ETDEWEB)

    Unsihuay-Vila, Clodomiro; Marangon-Lima, J.W.; Souza, A.C Zambroni de [Universidade Federal de Itajuba (UNIFEI), MG (Brazil)], emails: clodomirounsihuayvila @gmail.com, marangon@unifei.edu.br, zambroni@unifei.edu.br; Perez-Arriaga, I.J. [Universidad Pontificia Comillas, Madrid (Spain)], email: ipa@mit.edu

    2010-07-01

    A novel multi objective, multi area and multistage model to long-term expansion-planning of integrated generation and transmission corridors incorporating sustainable energy developing is presented in this paper. The proposed MESEDES model is a multi-regional multi-objective and 'bottom-up' energy model which considers the electricity generation/transmission value-chain, i.e., power generation alternatives including renewable, nuclear and traditional thermal generation along with transmission corridors. The model decides the optimal location and timing of the electricity generation/transmission abroad the multistage planning horizon. The MESEDES model considers three objectives belonging to sustainable energy development criteria such as: a) the minimization of investments and operation costs of : power generation, transmission corridors, energy efficiency (demand side management (DSM) programs) considering CO2 capture technologies; b) minimization of Life Cycle Greenhouse Gas Emissions (LC GHG); c) maximization of the diversification of electricity generation mix. The proposed model consider aspects of the carbon abatement policy under the CDM - Clean Development Mechanism or European Union Greenhouse Gas Emission Trading Scheme. A case study is used to illustrate the proposed framework. (author)

  13. Advanced model for expansion of natural gas distribution networks based on geographic information systems

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez-Rosado, I.J.; Fernandez-Jimenez, L.A.; Garcia-Garrido, E.; Zorzano-Santamaria, P.; Zorzano-Alba, E. [La Rioja Univ., La Rioja (Spain). Dept. of Electrical Engineering; Miranda, V.; Montneiro, C. [Porto Univ., Porto (Portugal). Faculty of Engineering]|[Inst. de Engenharia de Sistemas e Computadores do Porto, Porto (Portugal)

    2005-07-01

    An advanced geographic information system (GIS) model of natural gas distribution networks was presented. The raster-based model was developed to evaluate costs associated with the expansion of electrical networks due to increased demand in the La Rioja region of Spain. The model was also used to evaluate costs associated with maintenance and amortization of the already existing distribution network. Expansion costs of the distribution network were modelled in various demand scenarios. The model also considered a variety of technical factors associated with pipeline length and topography. Soil and slope data from previous pipeline projects were used to estimate real costs per unit length of pipeline. It was concluded that results obtained by the model will be used by planners to select zones where expansion is economically feasible. 4 refs., 5 figs.

  14. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization

  15. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  16. The US DOE Office of Environmental Management International Cooperative Program: Current Status and Plans for Expansion

    International Nuclear Information System (INIS)

    Gerdes, K.D.; Han, A.M.; Marra, J.C.; Fox, K.M.; Peeler, D.K.; Smith, M.E.; Jannik, G.T.; Farfan, E.B.; Kim, D.S.; Vienna, J.D.; Roach, J.A.; Aloy, A.S.; Stefanovsky, S.V.; Bondarkov, M.D.; Lopukh, D.P.; Kim, C.W.

    2009-01-01

    monitoring, analytical measurements, and numerical modeling of soils and groundwater radioactive contamination; and - Recommend the development and testing of effective cleanup technologies to reduce environmental and health risks. In FY09, continued collaboration with the current partners is planned. Additionally, new research projects are being planned to expand the international program. A collaborative project with Russian Electrotechnical University is underway to evaluate Cold Crucible Induction Melter (CCIM) control and monitoring technologies. A Statement of Intent was recently signed between DOE-EM and the U.K. Nuclear Decommissioning Authority (NDA) to work cooperatively on areas of mutual interest. Under this umbrella, discussions were held with NDA representatives to identify potential areas for collaboration. Information and technical exchanges were identified as near-term actions to help meet the objectives of the Statement of Intent. Technical exchanges in identified areas are being pursued in FY09. (authors)

  17. Not planning a sustainable transport system

    International Nuclear Information System (INIS)

    Finnveden, Göran; Åkerman, Jonas

    2014-01-01

    The overall objective of the Swedish transport policy is to ensure the economically efficient and sustainable provision of transport services for people and business throughout the country. More specifically, the transport sector shall, among other things, contribute to the achievement of environmental quality objectives in which the development of the transport system plays an important role in the achievement of the objectives. The aim of this study is to analyse if current transport planning supports this policy. This is done by analysing two recent cases: the National Infrastructure Plan 2010–2021, and the planning of Bypass Stockholm, a major road investment. Our results show that the plans are in conflict with several of the environmental quality objectives. Another interesting aspect of the planning processes is that the long-term climate goals are not included in the planning processes, neither as a clear goal nor as factor that will influence future transport systems. In this way, the long-term sustainability aspects are not present in the planning. We conclude that the two cases do not contribute to a sustainable transport system. Thus, several changes must be made in the processes, including putting up clear targets for emissions. Also, the methodology for the environmental assessments needs to be further developed and discussed. - Highlights: • Two cases are studied to analyse if current planning supports a sustainable transport system. • Results show that the plans are in conflict with several of the environmental quality objectives. • Long-term climate goals are not included in the planning processes. • Current practices do not contribute to a sustainable planning processes. • Methodology and process for environmental assessments must be further developed and discussed

  18. Not planning a sustainable transport system

    Energy Technology Data Exchange (ETDEWEB)

    Finnveden, Göran, E-mail: goran.finnveden@abe.kth.se; Åkerman, Jonas

    2014-04-01

    The overall objective of the Swedish transport policy is to ensure the economically efficient and sustainable provision of transport services for people and business throughout the country. More specifically, the transport sector shall, among other things, contribute to the achievement of environmental quality objectives in which the development of the transport system plays an important role in the achievement of the objectives. The aim of this study is to analyse if current transport planning supports this policy. This is done by analysing two recent cases: the National Infrastructure Plan 2010–2021, and the planning of Bypass Stockholm, a major road investment. Our results show that the plans are in conflict with several of the environmental quality objectives. Another interesting aspect of the planning processes is that the long-term climate goals are not included in the planning processes, neither as a clear goal nor as factor that will influence future transport systems. In this way, the long-term sustainability aspects are not present in the planning. We conclude that the two cases do not contribute to a sustainable transport system. Thus, several changes must be made in the processes, including putting up clear targets for emissions. Also, the methodology for the environmental assessments needs to be further developed and discussed. - Highlights: • Two cases are studied to analyse if current planning supports a sustainable transport system. • Results show that the plans are in conflict with several of the environmental quality objectives. • Long-term climate goals are not included in the planning processes. • Current practices do not contribute to a sustainable planning processes. • Methodology and process for environmental assessments must be further developed and discussed.

  19. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  20. Country Operational Plan and Reporting System

    Data.gov (United States)

    US Agency for International Development — This web-based information system allows for the annual entry and updating of Emergency Plan COPs, annual and semiannual program results, and budget information by...

  1. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  2. An Architecture for Proof Planning Systems

    OpenAIRE

    Dennis, Louise Abigail

    2005-01-01

    This paper presents a generic architecture for proof planning systems in terms of an interaction between a customisable proof module and search module. These refer to both global and local information contained in reasoning states.

  3. Trilogy, a planetary geodesy mission concept for measuring the expansion of the solar system

    Science.gov (United States)

    Smith, David E.; Zuber, Maria T.; Mazarico, Erwan; Genova, Antonio; Neumann, Gregory A.; Sun, Xiaoli; Torrence, Mark H.; Mao, Dan-dan

    2018-04-01

    The scale of the solar system is slowly changing, likely increasing as a result of solar mass loss, with additional change possible if there is a secular variation of the gravitational constant, G. The measurement of the change of scale could provide insight into the past and the future of the solar system, and in addition a better understanding of planetary motion and fundamental physics. Estimates for the expansion of the scale of the solar system are of order 1.5 cm year-1 AU-1, which over several years is an observable quantity with present-day laser ranging systems. This estimate suggests that laser measurements between planets could provide an accurate estimate of the solar system expansion rate. We examine distance measurements between three bodies in the inner solar system - Earth's Moon, Mars and Venus - and outline a mission concept for making the measurements. The concept involves placing spacecraft that carry laser ranging transponders in orbit around each body and measuring the distances between the three spacecraft over a period of several years. The analysis of these range measurements would allow the co-estimation of the spacecraft orbit, planetary ephemerides, other geophysical parameters related to the constitution and dynamics of the central bodies, and key geodetic parameters related to the solar system expansion, the Sun, and theoretical physics.

  4. Trilogy, a Planetary Geodesy Mission Concept for Measuring the Expansion of the Solar System.

    Science.gov (United States)

    Smith, David E; Zuber, Maria T; Mazarico, Erwan; Genova, Antonio; Neumann, Gregory A; Sun, Xiaoli; Torrence, Mark H; Mao, Dan-Dan

    2018-04-01

    The scale of the solar system is slowly changing, likely increasing as a result of solar mass loss, with additional change possible if there is a secular variation of the gravitational constant, G . The measurement of the change of scale could provide insight into the past and the future of the solar system, and in addition a better understanding of planetary motion and fundamental physics. Estimates for the expansion of the scale of the solar system are of order 1.5 cm year -1 AU -1 , which over several years is an observable quantity with present-day laser ranging systems. This estimate suggests that laser measurements between planets could provide an accurate estimate of the solar system expansion rate. We examine distance measurements between three bodies in the inner solar system -- Earth's Moon, Mars and Venus -- and outline a mission concept for making the measurements. The concept involves placing spacecraft that carry laser ranging transponders in orbit around each body and measuring the distances between the three spacecraft over a period of several years. The analysis of these range measurements would allow the co-estimation of the spacecraft orbit, planetary ephemerides, other geophysical parameters related to the constitution and dynamics of the central bodies, and key geodetic parameters related to the solar system expansion, the Sun, and theoretical physics.

  5. Draft Automatic Data Acquisition System Plan

    International Nuclear Information System (INIS)

    1987-04-01

    This Automatic Data Acquisition System (ADAS) Plan has been prepared in support of the requirement for detailed site characterization of the Deaf Smith County candidate repository site in salt, and describes the data acquisition system which will be used for unattended data collection from the geotechnical instrumentation installed at the site. Section 1.1 discusses the programmatic background to the plan, Section 1.2 presents the scope and purpose of the plan, and the organization of the document is given in Section 1.3. 31 refs., 34 figs., 8 tabs

  6. Resonant state expansion applied to three-dimensional open optical systems

    OpenAIRE

    Doost, M. B.; Langbein, W.; Muljarov, E. A.

    2014-01-01

    The resonant-state expansion (RSE), a rigorous perturbative method in electrodynamics, is developed for three-dimensional open optical systems. Results are presented using the analytically solvable homogeneous dielectric sphere as unperturbed system. Since any perturbation which breaks the spherical symmetry mixes transverse electric (TE) and transverse magnetic (TM) modes, the RSE is extended here to include TM modes and a zero-frequency pole of the Green's function. We demonstrate the valid...

  7. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  8. Identification systems subject to plan cybersecurity

    International Nuclear Information System (INIS)

    Guerrero Sanz, J.; Perez Alcaniz, T.; Garcia Garcia, I.

    2012-01-01

    The implementation of a Plan Cybersecurity ensures that systems and communications networks that perform functions related to both physical security such emergency action and their support systems, and interfaces that may affect them, are protected with an effective system against cyber attacks.

  9. Understanding the many-body expansion for large systems. I. Precision considerations

    International Nuclear Information System (INIS)

    Richard, Ryan M.; Lao, Ka Un; Herbert, John M.

    2014-01-01

    Electronic structure methods based on low-order “n-body” expansions are an increasingly popular means to defeat the highly nonlinear scaling of ab initio quantum chemistry calculations, taking advantage of the inherently distributable nature of the numerous subsystem calculations. Here, we examine how the finite precision of these subsystem calculations manifests in applications to large systems, in this case, a sequence of water clusters ranging in size up to (H 2 O) 47 . Using two different computer implementations of the n-body expansion, one fully integrated into a quantum chemistry program and the other written as a separate driver routine for the same program, we examine the reproducibility of total binding energies as a function of cluster size. The combinatorial nature of the n-body expansion amplifies subtle differences between the two implementations, especially for n ⩾ 4, leading to total energies that differ by as much as several kcal/mol between two implementations of what is ostensibly the same method. This behavior can be understood based on a propagation-of-errors analysis applied to a closed-form expression for the n-body expansion, which is derived here for the first time. Discrepancies between the two implementations arise primarily from the Coulomb self-energy correction that is required when electrostatic embedding charges are implemented by means of an external driver program. For reliable results in large systems, our analysis suggests that script- or driver-based implementations should read binary output files from an electronic structure program, in full double precision, or better yet be fully integrated in a way that avoids the need to compute the aforementioned self-energy. Moreover, four-body and higher-order expansions may be too sensitive to numerical thresholds to be of practical use in large systems

  10. Joint Performance and Planning System

    Data.gov (United States)

    US Agency for International Development — A joint State/USAID system hosted by State that integrates resource and performance information at the program level and enables more flexible and frequent entry of...

  11. The effect of short recovery period investment on least-cost generation system expansion

    International Nuclear Information System (INIS)

    Yiqun He; David, A.K.; Fernando, P.N.

    1995-01-01

    The effect of the short recovery period of private investment on least-cost generation system expansion is analysed, and a trade-off method for generation system expansion, which gives consideration to both the least-cost strategy and the short recovery period of private investment, is presented. First, the optimal mix of generation units under a standard recovery period for all units is established, and then the surcharge, due to the difference between the short recovery period and the standard recovery period, is calculated and shared between all units. The former is an optimization to make best use of natural resources, and the latter is a trade-off method to spread the surcharge throughout the system. (Author)

  12. Efficient expansion of mesenchymal stromal cells in a disposable fixed bed culture system.

    Science.gov (United States)

    Mizukami, Amanda; Orellana, Maristela D; Caruso, Sâmia R; de Lima Prata, Karen; Covas, Dimas T; Swiech, Kamilla

    2013-01-01

    The need for efficient and reliable technologies for clinical-scale expansion of mesenchymal stromal cells (MSC) has led to the use of disposable bioreactors and culture systems. Here, we evaluate the expansion of cord blood-derived MSC in a disposable fixed bed culture system. Starting from an initial cell density of 6.0 × 10(7) cells, after 7 days of culture, it was possible to produce of 4.2(±0.8) × 10(8) cells, which represents a fold increase of 7.0 (±1.4). After enzymatic retrieval from Fibra-Cell disks, the cells were able to maintain their potential for differentiation into adipocytes and osteocytes and were positive for many markers common to MSC (CD73, CD90, and CD105). The results obtained in this study demonstrate that MSC can be efficiently expanded in the culture system. This novel approach presents several advantages over the current expansion systems, based on culture flasks or microcarrier-based spinner flasks and represents a key element for MSC cellular therapy according to GMP compliant clinical-scale production system. Copyright © 2013 American Institute of Chemical Engineers.

  13. expansion method

    Indian Academy of Sciences (India)

    of a system under investigation is to model the system in terms of some ... The organization of the paper is as follows: In §2, a brief account of the (G /G)- expansion ...... It is interesting to note that from the general results, one can easily recover.

  14. A risk analysis for gas transport network planning expansion under regulatory uncertainty in Western Europe

    Energy Technology Data Exchange (ETDEWEB)

    Pelletier, C.; Wortmann, J.C. [Information System Cluster, Faculty of Economics and Business, Rijksuniversiteit Groningen, Landleven 5, Postbus 800, 9700 AV Groningen (Netherlands)

    2009-02-15

    The natural gas industry in Western Europe went through drastic changes induced by the unbundling of the national companies, followed by the liberalization of gas trade and the regulation of gas transmission. Natural gas transmission is operated through a network of interconnected grids, and is capacity constrained. Each of the grids is locally regulated in terms of price limits on transportation services. Local tariff differences may induce unnatural gas routing within a network, creating congestion in some part of it. This phenomena is referred to as the Jepma effect. Following Jepma (2001. Gaslevering onder druk. Stichting JIN. Available at: www.jiqweb.org (52pp) (in Dutch)) this may lead to misguided investment decisions. In this paper a multi-stage linear program is used to simulate the repartition of the natural gas flow in an interconnected grid system on a succession of contracting periods. By this simulation, the risk linked to infrastructure investment is assessed. The risk measured can be seen as the probability of a negative present net value for the investment. The model is applied on an example of two grids that are on alternative routes serving same destinations. When applied to a specific situation of North-West Europe (Germany and The Netherlands), the model clearly demonstrates that the risks turn out to be too high to invest: there are hardly any scenarios under which an acceptable ROI will be realized. Given the current tariff policy and current publicly available forecasts of demand and supply, it is unlikely that market forces will attract additional investments in transportation capacity. This reluctance to invest can be prohibitive for further growth of supply if the demand would increase significantly. (author)

  15. A risk analysis for gas transport network planning expansion under regulatory uncertainty in Western Europe

    International Nuclear Information System (INIS)

    Pelletier, C.; Wortmann, J.C.

    2009-01-01

    The natural gas industry in Western Europe went through drastic changes induced by the unbundling of the national companies, followed by the liberalization of gas trade and the regulation of gas transmission. Natural gas transmission is operated through a network of interconnected grids, and is capacity constrained. Each of the grids is locally regulated in terms of price limits on transportation services. Local tariff differences may induce unnatural gas routing within a network, creating congestion in some part of it. This phenomena is referred to as the Jepma effect. Following Jepma (2001. Gaslevering onder druk. Stichting JIN. Available at: www.jiqweb.org (52pp) (in Dutch)) this may lead to misguided investment decisions. In this paper a multi-stage linear program is used to simulate the repartition of the natural gas flow in an interconnected grid system on a succession of contracting periods. By this simulation, the risk linked to infrastructure investment is assessed. The risk measured can be seen as the probability of a negative present net value for the investment. The model is applied on an example of two grids that are on alternative routes serving same destinations. When applied to a specific situation of North-West Europe (Germany and The Netherlands), the model clearly demonstrates that the risks turn out to be too high to invest: there are hardly any scenarios under which an acceptable ROI will be realized. Given the current tariff policy and current publicly available forecasts of demand and supply, it is unlikely that market forces will attract additional investments in transportation capacity. This reluctance to invest can be prohibitive for further growth of supply if the demand would increase significantly. (author)

  16. Health workforce planning and service expansion during an economic crisis: A case study of the national breast screening programme in Ireland.

    Science.gov (United States)

    McHugh, S M; Tyrrell, E; Johnson, B; Healy, O; Perry, I J; Normand, C

    2015-12-01

    This article aims to estimate the workforce and resource implications of the proposed age extension of the national breast screening programme, under the economic constraints of reduced health budgets and staffing levels in the Irish health system. Using a mixed method design, a purposive sample of 20 participants were interviewed and data were analysed thematically (June-September 2012). Quantitative data (programme-level activity data, screening activity, staffing levels and screening plans) were used to model potential workload and resource requirements. The analysis indicates that over 90% operational efficiency was achieved throughout the first six months of 2012. Accounting for maternity leave (10%) and sick leave (3.5%), 16.1 additional radiographers (whole time equivalent) would be required for the workload created by the age extension of the screening programme, at 90% operational efficiency. The results suggest that service expansion is possible with relatively minimal additional radiography resources if the efficiency of the skill mix and the use of equipment are improved. Investing in the appropriate skill mix should not be limited to clinical groups but should also include administrative staff to manage and support the service. Workload modelling may contribute to improved health workforce planning and service efficiency. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  17. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  18. Implementation of the robustness analysis methodology for decenal planning in the expansion of electric sector; Aplicacao da metodologia de analise de robustez ao planejamento decenal de expansao do setor eletrico

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Renata de Azevedo Moreira da

    2008-05-15

    The objective of this dissertation is to develop an application from one of the techniques of 'soft' operational research, the Robustness Analysis, to the problem of decision making under uncertainty, as part of the planning of the electricity expansion planning process in Brazil. Initially are shown desirable characteristics of a methodology that will complement the traditional methods used in determining the expansion of the sector. Departing from the Decenal Plan for Power Expansion (2007/2016), an analysis of the different trends that can occur during the planning process is presented, so as to facilitate the visualization of the consequences of uncertainties that may change the schedule of the planned expansion and also help the interaction between actors working in the expansion planning of electricity generation. (author)

  19. Implementation of the robustness analysis methodology for decenal planning in the expansion of electric sector; Aplicacao da metodologia de analise de robustez ao planejamento decenal de expansao do setor eletrico

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Renata de Azevedo Moreira da

    2008-05-15

    The objective of this dissertation is to develop an application from one of the techniques of 'soft' operational research, the Robustness Analysis, to the problem of decision making under uncertainty, as part of the planning of the electricity expansion planning process in Brazil. Initially are shown desirable characteristics of a methodology that will complement the traditional methods used in determining the expansion of the sector. Departing from the Decenal Plan for Power Expansion (2007/2016), an analysis of the different trends that can occur during the planning process is presented, so as to facilitate the visualization of the consequences of uncertainties that may change the schedule of the planned expansion and also help the interaction between actors working in the expansion planning of electricity generation. (author)

  20. Code development of the national hemovigilance system and expansion strategies for hospital blood banks

    Directory of Open Access Journals (Sweden)

    Kim Jeongeun

    2012-01-01

    Full Text Available Objectives : The aims of this study were to develop reportable event codes that are applicable to the national hemovigilance systems for hospital blood banks, and to present expansion strategies for the blood banks. Materials and Methods : The data were obtained from a literature review and expert consultation, followed by adding to and revising the established hemovigilance code system and guidelines to develop reportable event codes for hospital blood banks. The Medical Error Reporting System-Transfusion Medicine developed in the US and other codes of reportable events were added to the Korean version of the Biologic Products Deviation Report (BPDR developed by the Korean Red Cross Blood Safety Administration, then using these codes, mapping work was conducted. We deduced outcomes suitable for practice, referred to the results of the advisory councils, and conducted a survey with experts and blood banks practitioners. Results : We developed reportable event codes that were applicable to hospital blood banks and could cover blood safety - from blood product safety to blood transfusion safety - and also presented expansion strategies for hospital blood banks. Conclusion : It was necessary to add 10 major categories to the blood transfusion safety stage and 97 reportable event codes to the blood safety stage. Contextualized solutions were presented on 9 categories of expansion strategies of hemovigilance system for the hospital blood banks.

  1. Rethinking Participation in Smart Energy System Planning

    NARCIS (Netherlands)

    Lammers, Imke; Arentsen, Maarten J.

    2017-01-01

    While the technical layout of smart energy systems is well advanced, the implementation of these systems is slowed down by the current decision-making practice regarding such energy infrastructures. We call for a reorganisation of the decision-making process on local energy planning and address the

  2. Non-intrusive uncertainty quantification in structural-acoustic systems using polynomial chaos expansion method

    Directory of Open Access Journals (Sweden)

    Wang Mingjie

    2017-01-01

    Full Text Available A framework of non-intrusive polynomial chaos expansion method (PC was proposed to investigate the statistic characteristics of the response of structural-acoustic system containing random uncertainty. The PC method does not need to reformulate model equations, and the statistics of the response can be evaluated directly. The results show that compared to the direct Monte Carlo method (MCM based on the original numerical model, the PC method is effective and more efficient.

  3. UBB expansion plan: Spain

    OpenAIRE

    Sousa, André Henderson

    2014-01-01

    Project of Master in International Management Just like the Portuguese saying “who runs for fun does not get tired”. UBB, a textile merchandising brand for Universities has been founded by four friends in 2012. It all started when Rui and André noticed that in their university there was no official merchandising. They saw a window of opportunity of bringing something new to the fore, which was an alternative for universities to have an official merchandising line without any monetar...

  4. Assateague Island National Seashore alternative transportation systems planning study and business plan for alternative transportation

    Science.gov (United States)

    2012-08-31

    The purpose of this study was to (1) study the potential expansion of existing alternative transportation systems (bicycle facilities) and development of new alternative transportation systems in and around the Maryland District of Assateague Island ...

  5. Tank waste remediation system engineering plan

    International Nuclear Information System (INIS)

    Rifaey, S.H.

    1998-01-01

    This Engineering Plan describes the engineering process and controls that will be in place to support the Technical Baseline definition and manage its evolution and implementation to the field operations. This plan provides the vision for the engineering required to support the retrieval and disposal mission through Phase 1 and 2, which includes integrated data management of the Technical Baseline. Further, this plan describes the approach for moving from the ''as is'' condition of engineering practice, systems, and facilities to the desired ''to be'' configuration. To make this transition, Tank Waste Remediation System (TWRS) Engineering will become a center of excellence for TWRS which,will perform engineering in the most effective manner to meet the mission. TWRS engineering will process deviations from sitewide systems if necessary to meet the mission most effectively

  6. NASDA knowledge-based network planning system

    Science.gov (United States)

    Yamaya, K.; Fujiwara, M.; Kosugi, S.; Yambe, M.; Ohmori, M.

    1993-01-01

    One of the SODS (space operation and data system) sub-systems, NP (network planning) was the first expert system used by NASDA (national space development agency of Japan) for tracking and control of satellite. The major responsibilities of the NP system are: first, the allocation of network and satellite control resources and, second, the generation of the network operation plan data (NOP) used in automated control of the stations and control center facilities. Up to now, the first task of network resource scheduling was done by network operators. NP system automatically generates schedules using its knowledge base, which contains information on satellite orbits, station availability, which computer is dedicated to which satellite, and how many stations must be available for a particular satellite pass or a certain time period. The NP system is introduced.

  7. Interactive orbital proximity operations planning system

    Science.gov (United States)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1990-01-01

    An interactive graphical planning system for on-site planning of proximity operations in the congested multispacecraft environment about the space station is presented. The system shows the astronaut a bird's eye perspective of the space station, the orbital plane, and the co-orbiting spacecraft. The system operates in two operational modes: (1) a viewpoint mode, in which the astronaut is able to move the viewpoint around in the orbital plane to range in on areas of interest; and (2) a trajectory design mode, in which the trajectory is planned. Trajectory design involves the composition of a set of waypoints which result in a fuel-optimal trajectory which satisfies all operational constraints, such as departure and arrival constraints, plume impingement constraints, and structural constraints. The main purpose of the system is to present the trajectory and the constraints in an easily interpretable graphical format. Through a graphical interactive process, the trajectory waypoints are edited until all operational constraints are satisfied. A series of experiments was conducted to evaluate the system. Eight airline pilots with no prior background in orbital mechanics participated in the experiments. Subject training included a stand-alone training session of about 6 hours duration, in which the subjects became familiar with orbital mechanics concepts and performed a series of exercises to familiarize themselves with the control and display features of the system. They then carried out a series of production runs in which 90 different trajectory design situations were randomly addressed. The purpose of these experiments was to investigate how the planning time, planning efforts, and fuel expenditures were affected by the planning difficulty. Some results of these experiments are presented.

  8. Strategies for automatic online treatment plan reoptimization using clinical treatment planning system: A planning parameters study

    International Nuclear Information System (INIS)

    Li, Taoran; Wu, Qiuwen; Zhang, You; Vergalasova, Irina; Lee, W. Robert; Yin, Fang-Fang; Wu, Q. Jackie

    2013-01-01

    Purpose: Adaptive radiation therapy for prostate cancer using online reoptimization provides an improved control of interfractional anatomy variations. However, the clinical implementation of online reoptimization is currently limited by the low efficiency of current strategies and the difficulties associated with integration into the current treatment planning system. This study investigates the strategies for performing fast (∼2 min) automatic online reoptimization with a clinical fluence-map-based treatment planning system; and explores the performance with different input parameters settings: dose-volume histogram (DVH) objective settings, starting stage, and iteration number (in the context of real time planning).Methods: Simulated treatments of 10 patients were reoptimized daily for the first week of treatment (5 fractions) using 12 different combinations of optimization strategies. Options for objective settings included guideline-based RTOG objectives, patient-specific objectives based on anatomy on the planning CT, and daily-CBCT anatomy-based objectives adapted from planning CT objectives. Options for starting stages involved starting reoptimization with and without the original plan's fluence map. Options for iteration numbers were 50 and 100. The adapted plans were then analyzed by statistical modeling, and compared both in terms of dosimetry and delivery efficiency.Results: All online reoptimized plans were finished within ∼2 min with excellent coverage and conformity to the daily target. The three input parameters, i.e., DVH objectives, starting stage, and iteration number, contributed to the outcome of optimization nearly independently. Patient-specific objectives generally provided better OAR sparing compared to guideline-based objectives. The benefit in high-dose sparing from incorporating daily anatomy into objective settings was positively correlated with the relative change in OAR volumes from planning CT to daily CBCT. The use of the

  9. Geothermal energy systems plan for Boise City

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This is a plan for development of a downtown Boise geothermal district space heating system incorporating legal, engineering, organizational, geological, and economic requirements. Topics covered include: resource characteristics, system design and feasibility, economic feasibility, legal overview, organizational alternatives, and conservation. Included in appendices are: property ownership patterns on the Boise Front, existing hot well data, legal briefs, environmental data, decision point communications, typical building heating system retrofit schematics, and background assumptions and data for cost summary. (MHR)

  10. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste

  11. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  12. Power system restoration: planning and simulation

    Energy Technology Data Exchange (ETDEWEB)

    Hazarika, D. [Assam Engineering Coll., Dept. of Electrical Engineering, Assam (India); Sinha, A.K. [Inidan Inst. of Technology, Dept. of Electrical Engineering, Kharagpur (India)

    2003-03-01

    This paper describes a restoration guidance simulator, which allows power system operator/planner to simulate and plan restoration events in an interactive mode. The simulator provides a list of restoration events according to the priority based on some restoration rules and list of priority loads. It also provides in an interactive mode the list of events, which becomes possible as the system grows during restoration. Further, the selected event is validated through a load flow and other analytical tools to show the consequences of implementing the planned event. (Author)

  13. Expansion of the high-voltage direct current transmission systems; Netzausbau mit Hochspannungs-Gleichstrom-Uebertragung

    Energy Technology Data Exchange (ETDEWEB)

    Spahic, Ervin; Benz, Thomas; Goerner, Raphael; Sass, Florian [ABB AG, Mannheim (Germany)

    2012-12-15

    In September 2010 the German federal government announced its energy concept for an environmentally friendly, reliable and affordable energy supply. This concept describes a ''path into the era of renewable energy'' up to the year 2050, with electricity production from photovoltaics and wind power taking centre stage. Since the expansion of renewable energy production is mainly taking place in the North (wind power) and the South (PV), this poses a great challenge to the electricity networks. It necessitates the expansion of power transmission systems, notably for transporting electricity generated by wind power in the North to the consumer centres in Western and Southern Germany. However, progress to this end has been very slow. For this reason a technical question now presents itself, namely whether high-voltage direct current technology could possibly offer a solution to the electricity transport problems associated with the energy turnaround.

  14. Analysis of Underactuated Dynamic Locomotion Systems Using Perturbation Expansion: The Twistcar Toy Example

    Science.gov (United States)

    Chakon, Ofir; Or, Yizhar

    2017-08-01

    Underactuated robotic locomotion systems are commonly represented by nonholonomic constraints where in mixed systems, these constraints are also combined with momentum evolution equations. Such systems have been analyzed in the literature by exploiting symmetries and utilizing advanced geometric methods. These works typically assume that the shape variables are directly controlled, and obtain the system's solutions only via numerical integration. In this work, we demonstrate utilization of the perturbation expansion method for analyzing a model example of mixed locomotion system—the twistcar toy vehicle, which is a variant of the well-studied roller-racer model. The system is investigated by assuming small-amplitude oscillatory inputs of either steering angle (kinematic) or steering torque (mechanical), and explicit expansions for the system's solutions under both types of actuation are obtained. These expressions enable analyzing the dependence of the system's dynamic behavior on the vehicle's structural parameters and actuation type. In particular, we study the reversal in direction of motion under steering angle oscillations about the unfolded configuration, as well as influence of the choice of actuation type on convergence properties of the motion. Some of the findings are demonstrated qualitatively by reporting preliminary motion experiments with a modular robotic prototype of the vehicle.

  15. 49 CFR 659.23 - System security plan: contents.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false System security plan: contents. 659.23 Section 659... State Oversight Agency § 659.23 System security plan: contents. The system security plan must, at a... system security plan; and (e) Document the rail transit agency's process for making its system security...

  16. Electric-power systems planning and greenhouse-gas emission management under uncertainty

    International Nuclear Information System (INIS)

    Li, Y.P.; Huang, G.H.

    2012-01-01

    Highlight: ►A multistage stochastic integer programming model is developed for planning electric-power systems. ►Uncertain and dynamic information can be incorporated within a multilayer scenario tree. ►This can help minimize system cost under random energy demand and greenhouse gas (GHG) abatement goal. ►Results can support decisions of facility expansion, electricity supply and GHG mitigation. - Abstract: In this study, a multistage interval-stochastic integer programming model is formulated for managing greenhouse gas (GHG) emissions and planning electric-power systems under uncertainty. The developed model can reflect dynamic, interactive, and uncertain characteristics of energy systems. Besides, the model can be used for answering questions related to types, times, demands and mitigations of energy systems planning practices, with the objective of minimizing system cost over a long-time planning horizon. The solutions can help generate electricity-generation schemes and capacity-expansion plans under different GHG-mitigation options and electricity-demand levels. Tradeoffs among system cost, energy security, and emission management can also be tackled. A high system cost will increase renewable energy supply and reduce GHG emission, while a desire for a low cost will run into risks of a high energy deficiency and a high GHG emission.

  17. Wigner expansions for partition functions of nonrelativistic and relativistic oscillator systems

    Science.gov (United States)

    Zylka, Christian; Vojta, Guenter

    1993-01-01

    The equilibrium quantum statistics of various anharmonic oscillator systems including relativistic systems is considered within the Wigner phase space formalism. For this purpose the Wigner series expansion for the partition function is generalized to include relativistic corrections. The new series for partition functions and all thermodynamic potentials yield quantum corrections in terms of powers of h(sup 2) and relativistic corrections given by Kelvin functions (modified Hankel functions) K(sub nu)(mc(sup 2)/kT). As applications, the symmetric Toda oscillator, isotonic and singular anharmonic oscillators, and hindered rotators, i.e. oscillators with cosine potential, are addressed.

  18. Upgrade plan for HANARO control computer system

    International Nuclear Information System (INIS)

    Kim, Min Jin; Kim, Young Ki; Jung, Hwan Sung; Choi, Young San; Woo, Jong Sub; Jun, Byung Jin

    2001-01-01

    A microprocessor based digital control system, the Multi-Loop Controller (MLC), which was chosen to control HANARO, was introduced to the market in early '80s and it had been used to control petrochemical plant, paper mill and Slowpoke reactor in Canada. Due to the development in computer technology, it has become so outdated model and the production of this model was discontinued a few years ago. Hence difficulty in acquiring the spare parts is expected. To achieve stable reactor control during its lifetime and to avoid possible technical dependency to the manufacturer, a long-term replacement plan for HANARO control computer system is on its way. The plan will include a few steps in its process. This paper briefly introduces the methods of implementation of the process and discusses the engineering activities of the plan

  19. Treatment planning systems for high precision radiotherapy

    International Nuclear Information System (INIS)

    Deshpande, D.D.

    2008-01-01

    Computerized Treatment Planning System (TPS) play an important role in radiotherapy with the intent to maximize tumor control and minimize normal tissue complications. Treatment planning during earlier days was generally carried out through the manual summations of standard isodose charts on to patient body contours that were generated by direct tracing or lead wire representation, and relied heavily on the careful choices of beam weights and wedging. Since then there had been tremendous advances in field of Radiation Oncology in last few decades. The linear accelerators had evolved from MLC's to IGRT, the techniques like 3DCRT, IMRT has become almost routine affair. The simulation has seen transition from simple 2D film/fluoroscopy localization to CT Simulator with added development in PET, PET- CT and MR imaging. The Networking and advances in computer technology has made it possible to direct transfer of Images, contours to the treatment planning systems

  20. PSA-2, Stress Analysis, Thermal Expansion and Loads in Multi Anchor Piping System

    Energy Technology Data Exchange (ETDEWEB)

    Nickols, A N [Codes Coordinator, Atomics International, P. O. Box 309, Canoga Park, California 91304 (United States)

    1975-03-01

    1 - Description of problem or function: PSA2 computes the reactions and stresses caused by thermal expansion and loads in a multi-anchor piping system which may contain loops and may be partially restrained at any point in any direction. 2 - Method of solution: The linear equations for the statically indeterminate pipe system are set up by a generalization of Brock's matrix method. By a systematic use of linear transforms, the matrix of the system of linear equations can be obtained by incidence algebra in the form of a symmetric banded matrix. 2 - Restrictions on the complexity of the problem - Maximum of: 36 sections. 3 - Unusual features of the program - PSA2 takes into account: (a) elasticity of the attachment of the pipe to the foundation, (b) restraints on pipe displacements by anchors and intermediate partial constraints of linear type, (c) given constant forces and moments acting upon the pipe system, (d) thermal expansion, (e) any geometrical structure of the pipe system, (f) several cases of stressing per pipe system, and (g) both metric and English units.

  1. PSA-2, Stress Analysis, Thermal Expansion and Loads in Multi Anchor Piping System

    International Nuclear Information System (INIS)

    Nickols, A.N.

    1975-01-01

    1 - Description of problem or function: PSA2 computes the reactions and stresses caused by thermal expansion and loads in a multi-anchor piping system which may contain loops and may be partially restrained at any point in any direction. 2 - Method of solution: The linear equations for the statically indeterminate pipe system are set up by a generalization of Brock's matrix method. By a systematic use of linear transforms, the matrix of the system of linear equations can be obtained by incidence algebra in the form of a symmetric banded matrix. 2 - Restrictions on the complexity of the problem - Maximum of: 36 sections. 3 - Unusual features of the program - PSA2 takes into account: (a) elasticity of the attachment of the pipe to the foundation, (b) restraints on pipe displacements by anchors and intermediate partial constraints of linear type, (c) given constant forces and moments acting upon the pipe system, (d) thermal expansion, (e) any geometrical structure of the pipe system, (f) several cases of stressing per pipe system, and (g) both metric and English units

  2. Systemic Planning: Dealing with Complexity by a Wider Approach to Planning

    DEFF Research Database (Denmark)

    Leleur, Steen

    2005-01-01

    and methodology that can be helpful for planning under circumstances characterised by complexity and uncertainty. It is argued that compared to conventional, planning – referred to as systematic planning - there is a need for a wider, more systemic approach to planning that is better suited to current real......On the basis of a new book Systemic Planning this paper addresses systems thinking and complexity in a context of planning. Specifically, renewal of planning thinking on this background is set out as so-called systemic planning (SP). The principal concern of SP is to provide principles...

  3. Reliability planning in distributed electric energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.

    1978-10-01

    The goal of this paper is to develop tools for technology evaluation that address questions involving the economics of large-scale systems. The kind of cost discussed usually involves some dynamic aspect of the energy system. In particular, such properties as flexibility, stability, and resilience are features of entire systems. Special attention must be paid to the question of reliability, i.e., availability on demand. The storage problem and the planning for reliability in utility systems are the subjects of this paper. The introductory chapter addresses preliminary definitions--reliability planning, uncertainty, resilience, and other sensitivities. The study focuses on the contrast between conventional power generation technologies with controllable output and intermittent resources such as wind and solar electric conversion devices. The system studied is a stylized representation of California conditions. Significant differences were found in reliability planning requirements (and therefore costs) for systems dominated by central station plants as opposed to those dominated by intermittent resource technologies. It is argued that existing hydroelectric facilities need re-optimization. These plants provide the only currently existing bulk power storage in electric energy systems. 38 references. (MCW)

  4. Strategic Planning for Management Information Systems.

    Science.gov (United States)

    Ein-Dor, Phillip; Segev, Eli

    1978-01-01

    Two factors predominate in determining the appropriateness of strategic plans for management information systems (MIS)--explicitness (the degree to which the process is conscious, formal, and documented) and situational fit (the degree to which the MIS is compatible with the specific organization and its members). (Author/IRT)

  5. Culture expansion of adipose derived stromal cells. A closed automated Quantum Cell Expansion System compared with manual flask-based culture

    DEFF Research Database (Denmark)

    Haack-Sørensen, Mandana; Follin, Bjarke; Juhl, Morten

    2016-01-01

    ) over two passages in the automated and functionally closed Quantum Cell Expansion System (Quantum system) is compared with traditional manual cultivation. Methods: Stromal vascular fraction was isolated from abdominal fat, suspended in α-MEM supplemented with 10% Fetal Bovine Serum and seeded...... into either T75 flasks or a Quantum system that had been coated with cryoprecipitate. The cultivation of ASCs from SVF was performed in 3 ways: flask to flask; flask to Quantum system; and Quantum system to Quantum system. In all cases, quality controls were conducted for sterility, mycoplasmas......, and endotoxins, in addition to the assessment of cell counts, viability, immunophenotype, and differentiation potential. Results: The viability of ASCs passage 0 (P0) and P1 was above 96%, regardless of cultivation in flasks or Quantum system. Expression of surface markers and differentiation potential...

  6. Experimental analysis of direct-expansion ground-coupled heat pump systems

    Science.gov (United States)

    Mei, V. C.; Baxter, V. D.

    1991-09-01

    Direct-expansion ground-coil-coupled (DXGC) heat pump systems have certain energy efficiency advantages over conventional ground-coupled heat pump (GCHP) systems. Principal among these advantages are that the secondary heat transfer fluid heat exchanger and circulating pump are eliminated. While the DXGC concept can produce higher efficiencies, it also produces more system design and environmental problems (e.g., compressor starting, oil return, possible ground pollution, and more refrigerant charging). Furthermore, general design guidelines for DXGC systems are not well documented. A two-pronged approach was adopted for this study: (1) a literature survey, and (2) a laboratory study of a DXGC heat pump system with R-22 as the refrigerant, for both heating and cooling mode tests done in parallel and series tube connections. The results of each task are described in this paper. A set of general design guidelines was derived from the test results and is also presented.

  7. [Mechanized system for planning technological processes].

    Science.gov (United States)

    Pashchenko, V S; Shapiro, A M

    1977-01-01

    A mechanized system for the production processes planning involving the use of an electronic code device for data preparation on a punched tape of the "EPECT-IT" type, at the base of which there are classifiers of standard operations and transitions to individual design members, is considered. A fragment of the classifier and a skeleton diagram of the system are presented. It is pointed out that the use of the system helps improve the quality of the design work, as well as to yield considerable economic advantages. The system is in operation at some enterprises of the medical engineering industry.

  8. PSSD - Planning System for Sustainable Development

    DEFF Research Database (Denmark)

    PSSD - Planning System for Sustainable Development - is a part of the Baltic Sea Region's INTERREG II C program. The current report describes some theories, methods and tools developed under the PSSD project. First, the theoretical foundation of the project is described. Secondly, the role...... of indicators in sustainable development is discussed and a Web-based indicator generator is described. Thirdly, we describe a number of methods and tools, which support planning for sustainable development. Finally, some technical interface tools - especially a Web-based interface to the methods and tools...

  9. Extension planning for electrical energy supply systems

    International Nuclear Information System (INIS)

    Bieselt, R.

    1975-01-01

    In the future as well as in the past, and in particular in the next decade a considerable increase in electrical energy demand can be expected. To satisfy this demand in a reliable and sufficient manner will force the utilities to invest large sums of money for the operation and the extension of power generation and distribution plants. The size of these investments justifies the search for more and more comprehensive and at the same time more detailed planning methods. With the help of system analysis a planning model for the electricity supply industry of a major supply area will be designed. (orig./RW) [de

  10. Pipesworld : applying planning systems to pipeline transportation

    Energy Technology Data Exchange (ETDEWEB)

    Milidiu, R.L.; Santos Liporace, F. [Pontificia Univ. Catolica, Rio de Janeiro (Brazil). Dept. de Informatica

    2004-07-01

    This paper explored issues facing the complex task of managing pipelines that transport large volumes of petroleum products over long distances. Since oil pipelines are generally a few inches wide and several miles long, reasonable amounts of distinct products can be transported with very small loss due to the mixing at liquid boundaries. Optimizing the transportation through oil pipelines in terms of maintenance and environmental safety is a high priority for pipeline operators. This paper presented the Pipesworld model which takes into account features such as product interface constraints, limited product storage capacities and due dates for product delivery. It has been benchmarked as a start-of-art general purpose artificial planning system. This paper also reported the results derived by general purpose artificial intelligence planning systems when applied to the Pipesworld model. It demonstrated how various modelling techniques can be used to enhance the planners performance. Current work in developing Plumber was also presented. This dedicated solver that addresses operational situations uses both general purpose planning techniques as well as domain specific knowledge. When Plumber was incorporated into Pipesworld, its outperformed Fast-Forward, one of the best available general purpose planning systems, suggesting that improved versions of Plumber have the potential to deal with various problem scenarios in pipeline operations. 11 refs., 2 tabs., 3 figs.

  11. Some characteristics of the Hungarian power systems long term expansion strategy

    International Nuclear Information System (INIS)

    Fazekas, A.

    1995-01-01

    The formulation of the power system expansion strategy meeting the targets of the Hungarian energy policy is justified by the ageing of the existing power plants, the technology change unavoidable because of the more and more rigorous environment protection regulations, the requirement of updating and by the compliance with the expectation of safe electric power supply. These requirements (fuel supply and diversification, economic considerations, operational and environmental considerations) call for the construction of new power plant units even if the demand for electric power would not show any further increase in future. 1 tab

  12. Line Capacity Expansion and Transmission Switching in Power Systems With Large-Scale Wind Power

    DEFF Research Database (Denmark)

    Villumsen, Jonas Christoffer; Bronmo, Geir; Philpott, Andy B.

    2013-01-01

    In 2020 electricity production from wind power should constitute nearly 50% of electricity demand in Denmark. In this paper we look at optimal expansion of the transmission network in order to integrate 50% wind power in the system, while minimizing total fixed investment cost and expected cost...... of power generation. We allow for active switching of transmission elements to reduce congestion effects caused by Kirchhoff's voltage law. Results show that actively switching transmission lines may yield a better utilization of transmission networks with large-scale wind power and increase wind power...

  13. The investigation of the non-orthogonal basis expansion method for a three-fermion system

    International Nuclear Information System (INIS)

    Baoqiu Chen; Kentucky Univ., Lexington, KY

    1992-01-01

    In this paper, the non-orthogonal basis expansion method has been extended to solve a three-fermion system. The radial wavefunction of such a system is expanded in terms of a non-orthogonal Gaussian basis. All matrix elements of the Hamiltonian, including the central, tensor and spin-orbit potentials are derived in analytical forms. The new method simplifies the three-body system calculations, which are usually rather tedious by other methods. The method can be used to calculate energies for both the ground state and low excited states and has been used further to investigate the other nuclear properties of a three-body system such as Λ 3 H. (Author)

  14. Inner-shell correlations and Sturm expansions in coupled perturbation calculations of atomic systems

    International Nuclear Information System (INIS)

    Sherstyuk, A.I.; Solov'eva, G.S.

    1995-01-01

    It is shown that virtual Hartree-Fock orbitals in Sturm-type expansions can be used to calculate the response of atomic systems to an external field within the framework of the coupled perturbation theory with allowance for correlation effects. The corrected electron-electron interaction in a system with field-distorted orbitals is considered by adding a nonlocal potential to a one-electron Hartree-Fock operator within each group of equivalent elections. The remaining correlation effects are calculated by solving a system of equations for corrections to the radial functions. The system is solved iteratively, with each subsequent iteration corresponding to a correction of an increasingly higher order in the electron--electron interaction. The explicit expression derived for the polarizability contains one-and two-particle radial integrals of the Sturm functions

  15. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1994-06-01

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies the close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M ampersand O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [''Program'' refers to the CRWMS-wide activity and ''project'' refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project

  16. Evaluation of the potential expansiveness of soils in the Hermanos Cruz neighbourhood, Pinar del Rio, Cuba: a contribution to urban planning

    International Nuclear Information System (INIS)

    Chinthaka-Ganepola, G.A.; Mohammed, A. S.; Ordaz Hernandez, A.; Estevez Cruz, E.; Hernandez Santana, J.R.

    2016-01-01

    Expansive soils can be categorized as one of the geohazards observed in the urban environment, representing a silent hazard to buildings and infrastructure. To evaluate this problematic soil it is necessary to know some of its geotechnical properties. Generally, the average values of soil properties are used in the methods which characterize the geological formation and the lithological group, which causes a great degree of uncertainty. To overcome this problem, this study proposes a procedure for estimating and modelling the principle soil properties that have an impact on expansive soils. The selected case study is located in the Hermanos Cruz neighbourhood in the city of Pinar del Rio in Cuba. The investigation was organized into the following stages: primary assessment of the potential expansiveness of the soils, modelling of the soil properties utilizing 3D geostatistical methods and finally the cartographic representation of the potential Expansiveness of soils on a Geographic Information System (GIS) platform at different depth zones which are of importance in the construction of shallow foundations of engineering works. The application of this methodology in the Hermanos Cruz neighbourhood revealed that its soils possess a potential expansiveness of low to medium, apart from some isolated zones which show a potential expansiveness of medium to high. (Author)

  17. Evaluation of the potential expansiveness of soils in the Hermanos Cruz neighbourhood, Pinar del Rio, Cuba: a contribution to urban planning

    Energy Technology Data Exchange (ETDEWEB)

    Chinthaka-Ganepola, G.A.; Mohammed, A. S.; Ordaz Hernandez, A.; Estevez Cruz, E.; Hernandez Santana, J.R.

    2016-07-01

    Expansive soils can be categorized as one of the geohazards observed in the urban environment, representing a silent hazard to buildings and infrastructure. To evaluate this problematic soil it is necessary to know some of its geotechnical properties. Generally, the average values of soil properties are used in the methods which characterize the geological formation and the lithological group, which causes a great degree of uncertainty. To overcome this problem, this study proposes a procedure for estimating and modelling the principle soil properties that have an impact on expansive soils. The selected case study is located in the Hermanos Cruz neighbourhood in the city of Pinar del Rio in Cuba. The investigation was organized into the following stages: primary assessment of the potential expansiveness of the soils, modelling of the soil properties utilizing 3D geostatistical methods and finally the cartographic representation of the potential Expansiveness of soils on a Geographic Information System (GIS) platform at different depth zones which are of importance in the construction of shallow foundations of engineering works. The application of this methodology in the Hermanos Cruz neighbourhood revealed that its soils possess a potential expansiveness of low to medium, apart from some isolated zones which show a potential expansiveness of medium to high. (Author)

  18. Electronic annealing Fermi operator expansion for DFT calculations on metallic systems

    Science.gov (United States)

    Aarons, Jolyon; Skylaris, Chris-Kriton

    2018-02-01

    Density Functional Theory (DFT) calculations with computational effort which increases linearly with the number of atoms (linear-scaling DFT) have been successfully developed for insulators, taking advantage of the exponential decay of the one-particle density matrix. For metallic systems, the density matrix is also expected to decay exponentially at finite electronic temperature and linear-scaling DFT methods should be possible by taking advantage of this decay. Here we present a method for DFT calculations at finite electronic temperature for metallic systems which is effectively linear-scaling (O(N)). Our method generates the elements of the one-particle density matrix and also finds the required chemical potential and electronic entropy using polynomial expansions. A fixed expansion length is always employed to generate the density matrix, without any loss in accuracy by the application of a high electronic temperature followed by successive steps of temperature reduction until the desired (low) temperature density matrix is obtained. We have implemented this method in the ONETEP linear-scaling (for insulators) DFT code which employs local orbitals that are optimised in situ. By making use of the sparse matrix machinery of ONETEP, our method exploits the sparsity of Hamiltonian and density matrices to perform calculations on metallic systems with computational cost that increases asymptotically linearly with the number of atoms. We demonstrate the linear-scaling computational cost of our method with calculation times on palladium nanoparticles with up to ˜13 000 atoms.

  19. Replacement of Cross-Site Transfer System Startup Plan

    International Nuclear Information System (INIS)

    Gerken, M.D.

    1996-01-01

    This Startup Plan provides a discussion of organizational responsibilities, work planning, quality assurance (QA), personnel qualifications, and testing requirements for the Cross-Site Transfer System

  20. Improvements in patient treatment planning systems

    International Nuclear Information System (INIS)

    Wheeler, F.J.; Wessol, D.E.; Nigg, D.W.; Atkinson, C.A.; Babcock, R.; Evans, J.

    1995-01-01

    The Boron Neutron Capture Therapy, Radiation treatment planning environment (BNCT-Rtpe) software system is used to develop treatment planning information. In typical use BNCT-Rtpe consists of three main components: (1) Semi-automated geometric modeling of objects (brain, target, eyes, sinus) derived from MRI, CT, and other medical imaging modalities, (2) Dose computations for these geometric models with rtt-MC, the INEL Monte Carlo radiation transport computer code, and (3) Dose contouring overlaid on medical images as well as generation of other dose displays. We continue to develop a planning system based on three-dimensional image-based reconstructions using Bspline surfaces. Even though this software is in an experimental state, it has been applied for large animal research and for an isolated case of treatment for a human glioma. Radiation transport is based on Monte Carlo, however there will be implementations of faster methods (e.g. diffusion theory) in the future. The important thing for treatment planning is the output which must convey, to the radiologist, the deposition of dose to healthy and target tissue. Many edits are available such that one can obtain contours registered to medical image, dose/volume histograms and most information required for treatment planning and response assessment. Recent work has been to make the process more automatic and easier to use. The interface, now implemented for contouring and reconstruction, utilizes the Xwindowing system and the MOTIF graphical users interface for effective interaction with the planner. Much work still remains before the tool can be applied in a routine clinical setting

  1. 77 FR 21161 - National Forest System Land Management Planning

    Science.gov (United States)

    2012-04-09

    ... 219 National Forest System Land Management Planning; Final Rule #0;#0;Federal Register / Vol. 77 , No... Forest Service 36 CFR Part 219 RIN 0596-AD02 National Forest System Land Management Planning AGENCY... Agriculture is adopting a new National Forest System land management planning rule (planning rule). The new...

  2. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  3. Culture expansion of adipose derived stromal cells. A closed automated Quantum Cell Expansion System compared with manual flask-based culture

    Directory of Open Access Journals (Sweden)

    Mandana Haack-Sørensen

    2016-11-01

    Full Text Available Abstract Background Adipose derived stromal cells (ASCs are a rich and convenient source of cells for clinical regenerative therapeutic approaches. However, applications of ASCs often require cell expansion to reach the needed dose. In this study, cultivation of ASCs from stromal vascular fraction (SVF over two passages in the automated and functionally closed Quantum Cell Expansion System (Quantum system is compared with traditional manual cultivation. Methods Stromal vascular fraction was isolated from abdominal fat, suspended in α-MEM supplemented with 10% Fetal Bovine Serum and seeded into either T75 flasks or a Quantum system that had been coated with cryoprecipitate. The cultivation of ASCs from SVF was performed in 3 ways: flask to flask; flask to Quantum system; and Quantum system to Quantum system. In all cases, quality controls were conducted for sterility, mycoplasmas, and endotoxins, in addition to the assessment of cell counts, viability, immunophenotype, and differentiation potential. Results The viability of ASCs passage 0 (P0 and P1 was above 96%, regardless of cultivation in flasks or Quantum system. Expression of surface markers and differentiation potential was consistent with ISCT/IFATS standards for the ASC phenotype. Sterility, mycoplasma, and endotoxin tests were consistently negative. An average of 8.0 × 107 SVF cells loaded into a Quantum system yielded 8.96 × 107 ASCs P0, while 4.5 × 106 SVF cells seeded per T75 flask yielded an average of 2.37 × 106 ASCs—less than the number of SVF cells seeded. ASCs P1 expanded in the Quantum system demonstrated a population doubling (PD around 2.2 regardless of whether P0 was previously cultured in flasks or Quantum, while ASCs P1 in flasks only reached a PD of 1.0. Conclusion: Manufacturing of ASCs in a Quantum system enhances ASC expansion rate and yield significantly relative to manual processing in T-flasks, while maintaining the purity and quality essential to

  4. Culture expansion of adipose derived stromal cells. A closed automated Quantum Cell Expansion System compared with manual flask-based culture.

    Science.gov (United States)

    Haack-Sørensen, Mandana; Follin, Bjarke; Juhl, Morten; Brorsen, Sonja K; Søndergaard, Rebekka H; Kastrup, Jens; Ekblond, Annette

    2016-11-16

    Adipose derived stromal cells (ASCs) are a rich and convenient source of cells for clinical regenerative therapeutic approaches. However, applications of ASCs often require cell expansion to reach the needed dose. In this study, cultivation of ASCs from stromal vascular fraction (SVF) over two passages in the automated and functionally closed Quantum Cell Expansion System (Quantum system) is compared with traditional manual cultivation. Stromal vascular fraction was isolated from abdominal fat, suspended in α-MEM supplemented with 10% Fetal Bovine Serum and seeded into either T75 flasks or a Quantum system that had been coated with cryoprecipitate. The cultivation of ASCs from SVF was performed in 3 ways: flask to flask; flask to Quantum system; and Quantum system to Quantum system. In all cases, quality controls were conducted for sterility, mycoplasmas, and endotoxins, in addition to the assessment of cell counts, viability, immunophenotype, and differentiation potential. The viability of ASCs passage 0 (P0) and P1 was above 96%, regardless of cultivation in flasks or Quantum system. Expression of surface markers and differentiation potential was consistent with ISCT/IFATS standards for the ASC phenotype. Sterility, mycoplasma, and endotoxin tests were consistently negative. An average of 8.0 × 10 7 SVF cells loaded into a Quantum system yielded 8.96 × 10 7 ASCs P0, while 4.5 × 10 6 SVF cells seeded per T75 flask yielded an average of 2.37 × 10 6 ASCs-less than the number of SVF cells seeded. ASCs P1 expanded in the Quantum system demonstrated a population doubling (PD) around 2.2 regardless of whether P0 was previously cultured in flasks or Quantum, while ASCs P1 in flasks only reached a PD of 1.0. Manufacturing of ASCs in a Quantum system enhances ASC expansion rate and yield significantly relative to manual processing in T-flasks, while maintaining the purity and quality essential to safe and robust cell production. Notably, the use of the Quantum

  5. Cost estimating issues in the Russian integrated system planning context

    International Nuclear Information System (INIS)

    Allentuck, J.

    1996-01-01

    An important factor in the credibility of an optimal capacity expansion plan is the accuracy of cost estimates given the uncertainty of future economic conditions. This paper examines the problems associated with estimating investment and operating costs in the Russian nuclear power context over the period 1994 to 2010

  6. Hydro - nuclear strategy in the expansion of the North and Northeast regions interconnected system

    International Nuclear Information System (INIS)

    Lima, J.O.V.

    1981-04-01

    The settlement of nuclear power plants in the North and Northeast Regions Interconnected System, taking into consideration merely economic analysis, is studied. Assuming that the system isn't connected with the Southeast Region, expansion alternatives were defined supported by an optimization model which mathematical formulation was based on a Linear Programming. The main model conditioning was the eletric energy market requirements evolution of the mentioned regions, estimated up to 2010, regarding tendencies presented by forecast elaborated by ELETROBRAS. The system was designed to assure its continuously attendance, even in the case of occurrence of a critical hidrological period, employing as generation sources hidroeletric plants and PWR nuclear power plants of 1245 MWe, similar to ANGRA II. (Author) [pt

  7. A Robust Single Primate Neuroepithelial Cell Clonal Expansion System for Neural Tube Development and Disease Studies

    Directory of Open Access Journals (Sweden)

    Xiaoqing Zhu

    2016-02-01

    Full Text Available Developing a model of primate neural tube (NT development is important to promote many NT disorder studies in model organisms. Here, we report a robust and stable system to allow for clonal expansion of single monkey neuroepithelial stem cells (NESCs to develop into miniature NT-like structures. Single NESCs can produce functional neurons in vitro, survive, and extensively regenerate neuron axons in monkey brain. NT formation and NESC maintenance depend on high metabolism activity and Wnt signaling. NESCs are regionally restricted to a telencephalic fate. Moreover, single NESCs can turn into radial glial progenitors (RGPCs. The transition is accurately regulated by Wnt signaling through regulation of Notch signaling and adhesion molecules. Finally, using the “NESC-TO-NTs” system, we model the functions of folic acid (FA on NT closure and demonstrate that FA can regulate multiple mechanisms to prevent NT defects. Our system is ideal for studying NT development and diseases.

  8. Review of the FAA 1982 National Airspace System plan

    Science.gov (United States)

    1982-08-01

    The National Airspace (NAS) Plan outlines the Federal Aviation Administration's most recent proposals for modernizing the facilities and equipment that make up the air traffic control (ATC) system. This review of the NAS Plan examines the Plan at two...

  9. Intelligent transportation systems business plan for Kentucky : final report.

    Science.gov (United States)

    2001-09-01

    This report presents a Business Plan for Intelligent Transportation Systems (ITS) in Kentucky. The purpose of the Business Plan is to define ITS projects that are planned for implementation from 2002 through 2007. The list of projects contained withi...

  10. Multiperiod planning tool for multisite pig production systems.

    Science.gov (United States)

    Nadal-Roig, E; Plà, L M

    2014-09-01

    This paper presents a multiperiod planning tool for multisite pig production systems based on Linear Programming (LP). The aim of the model is to help pig managers of multisite systems in making short-term decisions (mainly related to pig transfers between farms and batch management in fattening units) and mid-term or long-term decisions (according to company targets and expansion strategy). The model skeleton follows the structure of a three-site system that can be adapted to any multisite system present in the modern pig industry. There are three basic phases, namely, piglet production, rearing pigs, and fattening. Each phase involves a different set of farms; therefore, transportation between farms and delivering of pigs to the abattoir are under consideration. The model maximizes the total gross margin calculated from the income of sales to the abattoir and the production costs over the time horizon considered. Production cost depends on each type of farm involved in the process. Parameters like number of farms per phase and distance, farm capacity, reproduction management policies, feeding and veterinary expenses, and transportation costs are taken into account. The model also provides a schedule of transfers between farms in terms of animals to be transported and number of trucks involved. The use of the model is illustrated with a case study based on a real instance of a company located in Catalonia (Spain).

  11. A review of decellularized stem cell matrix: a novel cell expansion system for cartilage tissue engineering

    Directory of Open Access Journals (Sweden)

    M Pei

    2011-11-01

    Full Text Available Cell-based therapy is a promising biological approach for the treatment of cartilage defects. Due to the small size of autologous cartilage samples available for cell transplantation in patients, cells need to be expanded to yield a sufficient cell number for cartilage repair. However, chondrocytes and adult stem cells tend to become replicatively senescent once they are expanded on conventional plastic flasks. Many studies demonstrate that the loss of cell properties is concomitant with the decreased cell proliferation capacity. This is a significant challenge for cartilage tissue engineering and regeneration. Despite much progress having been made in cell expansion, there are still concerns over expanded cell size and quality for cell transplantation applications. Recently, in vivo investigations in stem cell niches have suggested the importance of developing an in vitro stem cell microenvironment for cell expansion and tissue-specific differentiation. Our and other investigators’ work indicates that a decellularized stem cell matrix (DSCM may provide such an expansion system to yield large-quantity and high-quality cells for cartilage tissue engineering and regeneration. This review briefly introduces key parameters in an in vivo stem cell niche and focuses on our recent work on DSCM for its rejuvenating or reprograming effect on various adult stem cells and chondrocytes. Since research in DSCM is still in its infancy, we are only able to discuss some potential mechanisms of DSCM on cell proliferation and chondrogenic potential. Further investigations of the underlying mechanism and in vivo regeneration capacity will allow this approach to be used in clinics.

  12. Identification of optimal strategies for energy management systems planning under multiple uncertainties

    International Nuclear Information System (INIS)

    Cai, Y.P.; Huang, G.H.; Yang, Z.F.; Tan, Q.

    2009-01-01

    Management of energy resources is crucial for many regions throughout the world. Many economic, environmental and political factors are having significant effects on energy management practices, leading to a variety of uncertainties in relevant decision making. The objective of this research is to identify optimal strategies in the planning of energy management systems under multiple uncertainties through the development of a fuzzy-random interval programming (FRIP) model. The method is based on an integration of the existing interval linear programming (ILP), superiority-inferiority-based fuzzy-stochastic programming (SI-FSP) and mixed integer linear programming (MILP). Such a FRIP model allows multiple uncertainties presented as interval values, possibilistic and probabilistic distributions, as well as their combinations within a general optimization framework. It can also be used for facilitating capacity-expansion planning of energy-production facilities within a multi-period and multi-option context. Complexities in energy management systems can be systematically reflected, thus applicability of the modeling process can be highly enhanced. The developed method has then been applied to a case of long-term energy management planning for a region with three cities. Useful solutions for the planning of energy management systems were generated. Interval solutions associated with different risk levels of constraint violation were obtained. They could be used for generating decision alternatives and thus help decision makers identify desired policies under various economic and system-reliability constraints. The solutions can also provide desired energy resource/service allocation and capacity-expansion plans with a minimized system cost, a maximized system reliability and a maximized energy security. Tradeoffs between system costs and constraint-violation risks could be successfully tackled, i.e., higher costs will increase system stability, while a desire for lower

  13. Linking human and natural systems in the planning process

    Science.gov (United States)

    Susan I. Stewart; Miranda H. Mockrin; Roger B. Hammer

    2012-01-01

    Planning links human and natural systems in the urban-rural interface by engaging people in consideration of the future of natural resources. We review evolving ideas about what planning entails, who it involves, and what its outcomes should be. Sense of place, collaboration, emergent planning, and other new developments in planning are discussed. Smaller plans,...

  14. 71: Three dimensional radiation treatment planning system

    International Nuclear Information System (INIS)

    Purdy, J.A.; Wong, J.W.; Harms, W.B.; Drzymala, R.E.; Emami, B.

    1987-01-01

    A prototype 3-dimensional (3-D) radiation treatment planning (RTP) system has been developed and is in use. The system features a real-time display device and an array processor for computer intensive computations. The dose distribution can be displayed as 2-D isodose distributions superimposed on 2-D gray scale images of the patient's anatomy for any arbitrary plane and as a display of isodose surfaces in 3-D. In addition, dose-volume histograms can be generated. 7 refs.; 2 figs

  15. Solar thermal systems successful planning and construction

    CERN Document Server

    Peuser, Dr Felix A; Schnauss, Martin

    2013-01-01

    Solar Thermal Systems summarizes the theoretical and practical knowledge gained from over 20 years of research, implementation and operation of thermal solar installations. This work provides answers to a variety of key questions by examining current solar installations, drawing upon past experiences and making proposals for future planning.- how do system components and materials behave under continuous operation?- which components have proven themselves and how are they used properly?- what are the causes of defects and how can they be avoided?- how long is the service life of modern solar i

  16. Plan for ecumenical hearing on the risks and potentialities of the further expansion of nuclear power programmes

    International Nuclear Information System (INIS)

    Francis, J.M.; Abrecht, P.

    1976-01-01

    The basis of the Hearing, initiated by the World Council of Churches, is explained. Some countries are planning a rapid development of nuclear power, but others are reluctant to follow this line. An outline is presented of the divergent views: those against refer to the political, social and technical problems which are being left with future generations (management of obsolete reactor systems, storage of radioactive wastes); restriction on free discussion on grounds of national security; need for international safeguards; economic questions; environmental impact; plutonium hazard of breeder reactors. Those for nuclear power argue that there is no obvious alternative way of meeting the world's power demands. Intermediate views are also presented. The Hearing received position papers prepared by specialists on the various aspects of the subject. The Hearing Group held a meeting at Sigtuna, Sweden, June 24 to 29, 1975. The text of the document they prepared and the position papers, are presented as separate papers in the present series. (U.K.)

  17. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Waste Policy Act of 1982 established the Office of Civilian Radioactive Waste Management (OCRWM) in the Department of Energy (DOE) to implement a program for the safe and permanent disposal of spent nuclear fuel and high-level radioactive waste. To achieve this objective, the OCRWM is developing an integrated waste-management system consisting of three elements: the transportation system, the monitored retrievable storage (MRS) facility, and the mined geologic disposal system (MGDS). The development of such a system requires management of many diverse disciplines that are involved in research, siting, design, licensing, and external interactions. The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe how the systems-engineering process will be implemented in the development of the waste-management system. Systems engineering will be used by the OCRWM to manage, integrate, and document all aspects of the technical development of the waste-management system and its system elements to ensure that the requirements of the waste-management program are met. It will be applied to all technical activities of the OCRWM program. It will be used by the OCRWM to specify the sequence of technical activities necessary to define the requirements the waste-management system must satisfy, to develop the waste-management system, to relate system elements to each other, and to determine how the waste-management system can be optimized to most effectively satisfy the requirements. Furthermore, systems engineering will be used in the management of Program activities at the program, program-element, and project levels by specifying procedures, studies, reviews, and documentation requirements. 9 refs., 1 fig

  18. Advanced exergy analyses of an ejector expansion transcritical CO_2 refrigeration system

    International Nuclear Information System (INIS)

    Bai, Tao; Yu, Jianlin; Yan, Gang

    2016-01-01

    Highlights: • Advanced exergy analyses are performed on CO_2 EERC cycle. • Compressor should be improved first, followed by ejector, evaporator and gas cooler. • Interactions among the system components are assessed with advanced exergy analysis. • Real potential for exergy destruction reduction of the system is 43.44%. - Abstract: This paper presents a thermodynamic investigation on an ejector expansion transcritical CO_2 refrigeration system with advanced exergy analysis. By splitting the exergy destruction into endogenous/exogenous and unavoidable/avoidable parts, more valuable information of the interactions among the system components and the components improvement potential is provided. The results indicate that the compressor with largest avoidable endogenous exergy destruction possesses the highest priority of improvement, followed by the ejector, evaporator and gas cooler. The system exergy destruction is dominantly endogenous, and 43.44% of the total exergy destruction can be avoided by improving the system components. The evaporator has a serious impact on the exogenous exergy destruction within the compressor and ejector, and its own exergy destruction is entirely belongs to endogenous part. The effects of the discharge pressure, compressor efficiency and ejector efficiency on the system exergetic performance are discussed. There is an optimal discharge pressure with respect to the minimum endogenous exergy destruction in the compressor. Avoidable endogenous exergy destruction rates of the compressor and ejector are respectively reduced by 93.6% and 81.7% when the corresponding component efficiency varies from 0.5 to 0.9.

  19. National Energy Plan 2030: a proposal for power generation expansion in the long term; Plano Nacional de Energia 2030: uma proposta de expansao para a geracao de energia eletrica no longo prazo

    Energy Technology Data Exchange (ETDEWEB)

    Guerreiro, Amilcar Goncalves; Pereira Junior, Amaro Olimpio; Lopes, Juarez Castrillon; Tavares, Marina Elisabete E.; Silva, Renata de A.M. da; Queiroz, Renato P.; Oliveira, Ricardo G. de [Empresa de Pesquisa Energetica (EPE), Brasilia, DF (Brazil)

    2008-07-01

    The article aims to present and discuss a proposal for electric energy expansion generation capacity in long term. This work identifies the most appropriate evolution of the hydrothermal mix for the expansion of the supply of electrical power in the country, over the horizon of planning by 2030. (author)

  20. Long-Term Planning in Restructured Power Systems

    International Nuclear Information System (INIS)

    Botterud, Audun

    2003-01-01

    This thesis describes the development of three decision support models for long-term investment planning in restructured power systems. The model concepts address the changing conditions for the electric power industry, with the introduction of more competitive markets, higher uncertainty and less centralised planning. Under these circumstances there is an emerging need for new planning models, also for analyses of the power system in a long-term perspective. The thesis focuses particularly on how dynamic and stochastic modelling can contribute to the improvement of decision making in a restructured power industry. We argue that the use of such modelling approaches has become more important after the introduction of competitive power markets, due to the participants' increased exposure to price fluctuations and economic risk. Our models can be applied by individual participants in the power system to evaluate investment projects for new power generation capacity. The models can also serve as a decision support tool on a regulatory level, providing analyses of the long-term performance of the power system under different regulations and market designs. In Chapter 1, we give a brief introduction to the ongoing development towards restructuring and liberalisation of the electrical power system. A discussion of the operation and organisation of restructured power systems is also provided. In Chapter 2, we look more specifically at different modelling approaches for expansion planning in electrical power systems. We also discuss how the contributions in this thesis compare to previous work in the field of decision support models for long-term planning in both regulated and competitive power systems. In Chapter 3, we develop a power market simulation model based on system dynamics. The advantages and limitations of using descriptive system dynamics models for long-term planning purposes in this context are also discussed. Chapter 4 is devoted to a novel optimisation

  1. Conversion of helical tomotherapy plans to step-and-shoot IMRT plans--Pareto front evaluation of plans from a new treatment planning system.

    Science.gov (United States)

    Petersson, Kristoffer; Ceberg, Crister; Engström, Per; Benedek, Hunor; Nilsson, Per; Knöös, Tommy

    2011-06-01

    The resulting plans from a new type of treatment planning system called SharePlan have been studied. This software allows for the conversion of treatment plans generated in a TomoTherapy system for helical delivery, into plans deliverable on C-arm linear accelerators (linacs), which is of particular interest for clinics with a single TomoTherapy unit. The purpose of this work was to evaluate and compare the plans generated in the SharePlan system with the original TomoTherapy plans and with plans produced in our clinical treatment planning system for intensity-modulated radiation therapy (IMRT) on C-arm linacs. In addition, we have analyzed how the agreement between SharePlan and TomoTherapy plans depends on the number of beams and the total number of segments used in the optimization. Optimized plans were generated for three prostate and three head-and-neck (H&N) cases in the TomoTherapy system, and in our clinical treatment planning systems (TPS) used for IMRT planning with step-and-shoot delivery. The TomoTherapy plans were converted into step-and-shoot IMRT plans in SharePlan. For each case, a large number of Pareto optimal plans were created to compare plans generated in SharePlan with plans generated in the Tomotherapy system and in the clinical TPS. In addition, plans were generated in SharePlan for the three head-and-neck cases to evaluate how the plan quality varied with the number of beams used. Plans were also generated with different number of beams and segments for other patient cases. This allowed for an evaluation of how to minimize the number of required segments in the converted IMRT plans without compromising the agreement between them and the original TomoTherapy plans. The plans made in SharePlan were as good as or better than plans from our clinical system, but they were not as good as the original TomoTherapy plans. This was true for both the head-and-neck and the prostate cases, although the differences between the plans for the latter were

  2. Planning for rural energy system: Part 2

    International Nuclear Information System (INIS)

    Devadas, V.

    2001-01-01

    This paper discusses the central importance of energy inputs in development, and presents the complex interactions within subsystems that contribute a Rural Energy System. This paper also brings about the importance of the primary data for realistic renewable energy planning at the micro level in a given rural system. Factors that render secondary data somewhat inadequate for such applications are discussed. The differences between energy related data from secondary and primary sources in respect of representative villages in Kanyakumari District of Tamil Nadu, India, are detailed. A rural system model for computing the output from various components of a rural system is also presented. This projection is made by making use of a set of technical coefficients, which relate the inputs to the outputs from individual segments of the rural production system. While some of the technical coefficients are developed based on previously published data, a large number have been quantified on the basis of careful survey. The usefulness of the model is discussed. The paper also presents a Linear Programming Model for optimum resource allocation in a rural system. The objective function of the Linear Programming Model is maximizing the revenue of the rural system where in optimum resource allocation is made subject to a number of energy and non-energy related relevant constraints. The model also quantifies the major yields as well as the byproducts of different sectors of the rural economic system. (Author)

  3. Engineering task plan for purged light system

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    A purged, closed circuit television system is currently used to video inside of waste tanks. The video is used to support inspection and assessment of the tank interiors, waste residues, and deployed hardware. The system is also used to facilitate deployment of new equipment. A new light source has been requested by Characterization Project Operations (CPO) for the video system. The current light used is mounted on the camera and provides 75 watts of light, which is insufficient for clear video. Other light sources currently in use on the Hanford site either can not be deployed in a 4-inch riser or do not meet the ignition source controls. The scope of this Engineering Task Plan is to address all activities associated with the specification and procurement of a light source for use with the existing CPO video equipment. The installation design change to tank farm facilities is not within the scope of this ETP

  4. Statistical modeling to support power system planning

    Science.gov (United States)

    Staid, Andrea

    This dissertation focuses on data-analytic approaches that improve our understanding of power system applications to promote better decision-making. It tackles issues of risk analysis, uncertainty management, resource estimation, and the impacts of climate change. Tools of data mining and statistical modeling are used to bring new insight to a variety of complex problems facing today's power system. The overarching goal of this research is to improve the understanding of the power system risk environment for improved operation, investment, and planning decisions. The first chapter introduces some challenges faced in planning for a sustainable power system. Chapter 2 analyzes the driving factors behind the disparity in wind energy investments among states with a goal of determining the impact that state-level policies have on incentivizing wind energy. Findings show that policy differences do not explain the disparities; physical and geographical factors are more important. Chapter 3 extends conventional wind forecasting to a risk-based focus of predicting maximum wind speeds, which are dangerous for offshore operations. Statistical models are presented that issue probabilistic predictions for the highest wind speed expected in a three-hour interval. These models achieve a high degree of accuracy and their use can improve safety and reliability in practice. Chapter 4 examines the challenges of wind power estimation for onshore wind farms. Several methods for wind power resource assessment are compared, and the weaknesses of the Jensen model are demonstrated. For two onshore farms, statistical models outperform other methods, even when very little information is known about the wind farm. Lastly, chapter 5 focuses on the power system more broadly in the context of the risks expected from tropical cyclones in a changing climate. Risks to U.S. power system infrastructure are simulated under different scenarios of tropical cyclone behavior that may result from climate

  5. Unnatural base pair systems toward the expansion of the genetic alphabet in the central dogma.

    Science.gov (United States)

    Hirao, Ichiro; Kimoto, Michiko

    2012-01-01

    Toward the expansion of the genetic alphabet of DNA, several artificial third base pairs (unnatural base pairs) have been created. Synthetic DNAs containing the unnatural base pairs can be amplified faithfully by PCR, along with the natural A-T and G-C pairs, and transcribed into RNA. The unnatural base pair systems now have high potential to open the door to next generation biotechnology. The creation of unnatural base pairs is a consequence of repeating "proof of concept" experiments. In the process, initially designed base pairs were modified to address their weak points. Some of them were artificially evolved to ones with higher efficiency and selectivity in polymerase reactions, while others were eliminated from the analysis. Here, we describe the process of unnatural base pair development, as well as the tests of their applications.

  6. Basis expansion model for channel estimation in LTE-R communication system

    Directory of Open Access Journals (Sweden)

    Ling Deng

    2016-05-01

    Full Text Available This paper investigates fast time-varying channel estimation in LTE-R communication systems. The Basis Expansion Model (BEM is adopted to fit the fast time-varying channel in a high-speed railway communication scenario. The channel impulse response is modeled as the sum of basis functions multiplied by different coefficients. The optimal coefficients are obtained by theoretical analysis. Simulation results show that a Generalized Complex-Exponential BEM (GCE-BEM outperforms a Complex-Exponential BEM (CE-BEM and a polynomial BEM in terms of Mean Squared Error (MSE. Besides, the MSE of the CE-BEM decreases gradually as the number of basis functions increases. The GCE-BEM has a satisfactory performance with the serious fading channel.

  7. Capacity of fully correlated MIMO system using character expansion of groups

    Directory of Open Access Journals (Sweden)

    Ejaz Khan

    2005-09-01

    Full Text Available It is well known that the use of antenna arrays at both sides of communication link can result in high channel capacities provided that the propagation medium is rich scattering. In most previous works presented on MIMO wireless structures, Rayleigh fading conditions were considered. In this work, the capacity of MIMO systems under fully correlated (i.e., correlations between rows and columns of channel matrix fading is considered. We use replica method and character expansions to calculate the capacity of correlated MIMO channel in closed form. In our calculations, it is assumed that the receiver has perfect channel state information (CSI but no such information is available at the transmitter.

  8. Revising legislative system for E-commerce activation and expansion of infrastructure

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dae Hee [Ministry of Infomatiion and Communications, Kwachon (Korea)

    2000-04-01

    Since the rapidly developing E-commerce in worldwide enables direct transactions between producers and consumers, it improves efficiency over whole economy with cutbacks of intermediate trade and growth of parcel service business. However, E-commerce is basically a trade without meeting each other and the side effects of E-commerce, such as a fraud and outflow of personal information, are emerging by abusing its feature that cannot be known a counterpart of trade. To be developed as an advanced country in E-commerce area by 2003, Korea should settle the revision of legislative system on E-commerce and the expansion of infrastructure first for a continuous development of such a new business.

  9. Guide to Developing an Environmental Management System - Plan

    Science.gov (United States)

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  10. Tank waste remediation system retrieval and disposal mission infrastructure plan

    International Nuclear Information System (INIS)

    Root, R.W.

    1998-01-01

    This system plan presents the objectives, organization, and management and technical approaches for the Infrastructure Program. This Infrastructure Plan focuses on the Tank Waste Remediation System (TWRS) Project's Retrieval and Disposal Mission

  11. Radioisotope thermoelectric generator transportation system subsystem 143 software development plan

    International Nuclear Information System (INIS)

    King, D.A.

    1994-01-01

    This plan describes the activities to be performed and the controls to be applied to the process of specifying, developing, and qualifying the data acquisition software for the Radioisotope Thermoelectric Generator (RTG) Transportation System Subsystem 143 Instrumentation and Data Acquisition System (IDAS). This plan will serve as a software quality assurance plan, a verification and validation (V and V) plan, and a configuration management plan

  12. Comparison of the unitary pole and Adhikari-Sloan expansions in the three nucleon system

    International Nuclear Information System (INIS)

    Afnan, I.R.; Birrell, N.D.

    1977-01-01

    The binding energy of 3 H, percentage S-, S'- and D-state probability, and charge form factor of 3 He are calculated using the unitary pole and Adhikari-Sloan separable expansions to the Reid soft core potential. Comparison of the results for the two separable expansions show that the expansion of Adhikari and Sloan has the better convergence property, and the lowest rank expansion considered (equivalent to the unitary pole approximation) gives a good approximation to the binding energy of 3 H and the charge form factor of 3 He, even at large momentum transfer (K 2 -2 ). (Author)

  13. 49 CFR 659.21 - System security plan: general requirements.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false System security plan: general requirements. 659.21... State Oversight Agency § 659.21 System security plan: general requirements. (a) The oversight agency shall require the rail transit agency to implement a system security plan that, at a minimum, complies...

  14. An expert system for a local planning environment

    NARCIS (Netherlands)

    Meester, G.J.; Meester, G.J.

    1993-01-01

    In this paper, we discuss the design of an Expert System (ES) that supports decision making in a Local Planning System (LPS) environment. The LPS provides the link between a high level factory planning system (rough cut capacity planning and material coordination) and the actual execution of jobs on

  15. Förster resonance energy transfer, absorption and emission spectra in multichromophoric systems. II. Hybrid cumulant expansion.

    Science.gov (United States)

    Ma, Jian; Moix, Jeremy; Cao, Jianshu

    2015-03-07

    We develop a hybrid cumulant expansion method to account for the system-bath entanglement in the emission spectrum in the multi-chromophoric Förster transfer rate. In traditional perturbative treatments, the emission spectrum is usually expanded with respect to the system-bath coupling term in both real and imaginary time. This perturbative treatment gives a reliable absorption spectrum, where the bath is Gaussian and only the real-time expansion is involved. For the emission spectrum, the initial state is an entangled state of the system plus bath. Traditional perturbative methods are problematic when the excitations are delocalized and the energy gap is larger than the thermal energy, since the second-order expansion cannot predict the displacement of the bath. In the present method, the real-time dynamics is carried out by using the 2nd-order cumulant expansion method, while the displacement of the bath is treated more accurately by utilizing the exact reduced density matrix of the system. In a sense, the hybrid cumulant expansion is based on a generalized version of linear response theory with entangled initial states.

  16. ReEDS-Mexico: A Capacity Expansion Model of the Mexican Power System

    Energy Technology Data Exchange (ETDEWEB)

    Ho, Jonathan L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Cole, Wesley J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Spyrou, Evangelia [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-29

    This report documents the ReEDS-Mexico capacity expansion model, which is an extension of the ReEDS model to the Mexican power system. In recent years Mexico’s power sector has undergone considerable reform that has significant potential to impact the future electricity mix (Alpizar–Castro and Rodríguez–Monroy 2016). Day-ahead and real-time trading in Mexico’s power markets opened in early 2016. In addition to this reform, Mexico is striving to ensure that 35% of its electricity is generated from clean energy sources by 2024, 40% by 2035, and 50% by 2050 (Presidencia de la República 2016). These rapid changes in both the market and the generation mix create a need for robust tools that can help electricity sector stakeholders make informed decisions. The purpose of this report is to document the extension of the National Renewable Energy Laboratory’s (NREL’s) Regional Energy Deployment System (ReEDS) model (Eurek et al. 2016) to cover the Mexico power system. This extension, which we will refer to throughout this paper as ReEDS-Mexico, provides a model of the Mexico power sector using a system-wide, least-cost optimization framework.

  17. Output Tracking Control of Switched Hybrid Systems: A Fliess Functional Expansion Approach

    Directory of Open Access Journals (Sweden)

    Fenghua He

    2013-01-01

    Full Text Available The output tracking problem is investigated for a nonlinear affine system with multiple modes of continuous control inputs. We convert the family of nonlinear affine systems under consideration into a switched hybrid system by introducing a multiple-valued logic variable. The Fliess functional expansion is adopted to express the input and output relationship of the switched hybrid system. The optimal switching control is determined for a multiple-step output tracking performance index. The proposed approach is applied to a multitarget tracking problem for a flight vehicle aiming for one real target with several decoys flying around it in the terminal guidance course. These decoys appear as apparent targets and have to be distinguished with the approaching of the flight vehicle. The guidance problem of one flight vehicle versus multiple apparent targets should be considered if no large miss distance might be caused due to the limitation of the flight vehicle maneuverability. The target orientation at each time interval is determined. Simulation results show the effectiveness of the proposed method.

  18. An impact assessment of electricity and emission allowances pricing in optimised expansion planning of power sector portfolios

    International Nuclear Information System (INIS)

    Tolis, Athanasios I.; Rentizelas, Athanasios A.

    2011-01-01

    Highlights: → The impact of electricity and CO 2 allowance pricing in power sector is researched. → A stochastic programming approach without recourse is used for the optimisation. → Higher electricity prices may be proportionally beneficial for the power system. → The CO 2 allowance prices may be inversely proportionate with the expected yields. → High CO 2 allowance prices are inhibitors for conventional technology projects. -- Abstract: The present work concerns a systematic investigation of power sector portfolios through discrete scenarios of electricity and CO 2 allowance prices. The analysis is performed for different prices, from regulated to completely deregulated markets, thus representing different electricity market policies. The modelling approach is based on a stochastic programming algorithm without recourse, used for the optimisation of power sector economics under multiple uncertainties. A sequential quadratic programming routine is applied for the entire investigation period whilst the time-dependent objective function is subject to various social and production constraints, usually confronted in power sectors. The analysis indicated the optimal capacity additions that should be annually ordered from each competitive technology in order to substantially improve both the economy and the sustainability of the system. It is confirmed that higher electricity prices lead to higher financial yields of power production, irrespective of the CO 2 allowance price level. Moreover, by following the proposed licensing planning, a medium-term reduction of CO 2 emissions per MW h by 30% might be possible. Interestingly, the combination of electricity prices subsidisation with high CO 2 allowance prices may provide favourable conditions for investors willing to engage on renewable energy markets.

  19. Real Time Control strategies to reduce expansion of urban drainage systems. Case study: Lyngby-Taarbæk

    DEFF Research Database (Denmark)

    Meneses Ortega, Elbys Jose; Gaussens, Marion; Jakobsen, Carsten

    2014-01-01

    This article illustrates how real time control (RTCs) strategies can contribute to reduce the expansion of urban drainage infrastructures while maintaining the desired level of service. The Lyngby-Taarbæk catchment is used as case study: based on a static design, a storage expansion of 24,200m3 has...... to the simulation results, RTC succeeded in providing similar performance of the drainage system by maximizing use of the available storage. A storage reduction of 5,220 m3 is accomplished (corresponding to 21% of the proposed basin expansion). The reduced system operated dynamically generates lower combined sewer...... overflow (CSO) discharges for small to medium rain events; while the desired performance of the system is achieved for big events. The rule-based strategy reduces significantly CSO, however DORA provides generally better results by using forecasting and riskbased approach. These results show...

  20. A Simple Method for Determining Thermal Expansion Coefficient of Solid Materials with a Computer-aided Electromagnetic Dilatometer Measuring System

    Directory of Open Access Journals (Sweden)

    Z. EZZOUINE

    2015-07-01

    Full Text Available In this study, we present a newly designed electromagnetic dilatometer with micrometer accuracy for the measurement of the coefficient of thermal expansion of a solid in the 30 °C – 96 °C temperature range .The device has a graphical user interface to view real time data measurement. Iron and copper were subjected to temperature change in the thermal expansion experiment causing them to expand linearly. The voltage delivered in the electromagnetic dilatometer system, which includes the information about linear expansion and temperature change were transferred to a computer via a data acquisition card, presented by a program created in the LabVIEW environment, and the amount of linear expansion was detected in real time. The minimal change in length of the sample that can be resolved is 5µm, which yields the sensitivity comprised between 10-4 µm and 10-5 µm. In order to calibrate the electromagnetic dilatometer, thermal expansion coefficients of copper and Iron have been measured. By this technique, the thermal expansion coefficient can be determined with an acceptable accuracy. The present results appear also to agree well with those reported previously in the literature.

  1. Efficient linear precoding for massive MIMO systems using truncated polynomial expansion

    KAUST Repository

    Müller, Axel

    2014-06-01

    Massive multiple-input multiple-output (MIMO) techniques have been proposed as a solution to satisfy many requirements of next generation cellular systems. One downside of massive MIMO is the increased complexity of computing the precoding, especially since the relatively \\'antenna-efficient\\' regularized zero-forcing (RZF) is preferred to simple maximum ratio transmission. We develop in this paper a new class of precoders for single-cell massive MIMO systems. It is based on truncated polynomial expansion (TPE) and mimics the advantages of RZF, while offering reduced and scalable computational complexity that can be implemented in a convenient parallel fashion. Using random matrix theory we provide a closed-form expression of the signal-to-interference-and-noise ratio under TPE precoding and compare it to previous works on RZF. Furthermore, the sum rate maximizing polynomial coefficients in TPE precoding are calculated. By simulation, we find that to maintain a fixed peruser rate loss as compared to RZF, the polynomial degree does not need to scale with the system, but it should be increased with the quality of the channel knowledge and signal-to-noise ratio. © 2014 IEEE.

  2. Commercialization plan laser-based decoating systems

    International Nuclear Information System (INIS)

    Freiwald, J.; Freiwald, D.A.

    1998-01-01

    F2 Associates Inc. (F2) is a small, high-technology firm focused on developing and commercializing environmentally friendly laser ablation systems for industrial-rate removal of surface coatings from metals, concrete, and delicate substrates such as composites. F2 has a contract with the US Department of Energy Federal Energy Technology Center (FETC) to develop and test a laser-based technology for removing contaminated paint and other contaminants from concrete and metal surfaces. Task 4.1 in Phase 2 of the Statement of Work for this DOE contract requires that F2 ''document its plans for commercializing and marketing the stationary laser ablation system. This document shall include a discussion of prospects for commercial customers and partners and may require periodic update to reflect changing strategy. This document shall be submitted to the DOE for review.'' This report is being prepared and submitted in fulfillment of that requirement. This report describes the laser-based technology for cleaning and coatings removal, the types of laser-based systems that have been developed by F2 based on this technology, and the various markets that are emerging for this technology. F2's commercialization and marketing plans are described, including how F2's organization is structured to meet the needs of technology commercialization, F2's strategy and marketing approach, and the necessary steps to receive certification for removing paint from aircraft and DOE certification for D and D applications. The future use of the equipment built for the DOE contract is also discussed

  3. School Expansion in North Korea and South Korea: Two Systems, Two Approaches.

    Science.gov (United States)

    Lee, Hyangkue

    2001-01-01

    Examines differences in the public-policy objectives and financing of school expansion efforts in North and South Korea. Institutionalizing credentialism and reliance on financing private education dominates South Korean school expansion, while the financing of public schools and greater government control of education dominates North Korean…

  4. Business System Planning Project, Alternatives Analysis

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files

  5. Information System Architectures: Representation, Planning and Evaluation

    Directory of Open Access Journals (Sweden)

    André Vasconcelos

    2003-12-01

    Full Text Available In recent years organizations have been faced with increasingly demanding business environments - pushed by factors like market globalization, need for product and service innovation and product life cycle reduction - and with new information technologies changes and opportunities- such as the Component-off-the-shelf paradigm, the telecommunications improvement or the Enterprise Systems off-the-shelf modules availability - all of which impose a continuous redraw and reorganization of business strategies and processes. Nowadays, Information Technology makes possible high-speed, efficient and low cost access to the enterprise information, providing the means for business processes automation and improvement. In spite of these important technological progresses, information systems that support business, do not usually answer efficiently enough to the continuous demands that organizations are faced with, causing non-alignment between business and information technologies (IT and therefore reducing organization competitive abilities. This article discusses the vital role that the definition of an Information System Architecture (ISA has in the development of Enterprise Information Systems that are capable of staying fully aligned with organization strategy and business needs. In this article the authors propose a restricted collection of founding and basis operations, which will provide the conceptual paradigm and tools for proper ISA handling. These tools are then used in order to represent, plan and evaluate an ISA of a Financial Group.

  6. Flexible power generation systems and their planning

    International Nuclear Information System (INIS)

    Schwarzenbach, A.; Wunsch, A.K.

    1989-01-01

    By determining their specific annual costs and expressing them in relation to the period of utilization or to the load factor, it is possible to compare the relative merits of different combinbations of power generation systems. This method, with which unsuitable planning variants can be eliminated without having to go through long, intricate calculations and without taking up costly computer time, has the advantage that it points up the origin of the costs and at the same time makes clear how improvement can be achieved by combining base-load, medium-load and peak-load plants. The different types of power plant (hydro-electric, nuclear, steam, gas-turbine, combined cycle, cogeneration and coal gasification) are characterized by their approximate specific capital investment, construction period, efficiency, fuel, duty, and time from cold start to full load. They are compared by plotting their total specific annual costs in SFr/kWa against the load factor. The special benefits which combined cycle plants, with gas turbines, heat-recovery boilers and steam plant, can offer today (not only high fuel utilization and relatively low first-time costs, but also the short time needed for planning and construction) are underlined. 5 refs.; 9 figs.; 3 tabs

  7. Planning the expansion of distribution: technical and regulatory considerations; Planejamento da expansao da distribuicao: consideracoes tecnicas e regulatorias

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Afonso Henriques Moreira; Haddad, Jamil; Cruz, Ricardo Alexandre Passos da [Universidade Federal de Itajuba (EXCEN/UNIFEI), MG (Brazil). Centro de Excelencia em Eficiencia Energetica, Recursos Naturais e Energia

    2008-07-01

    The article presents the basis for the new planning of power distribution highlighting the beginning of the public hearing process for the creation of PRODIST: Procedures for Distribution of Electric Power by the ANEEL - National Agency of Electrical Energy.

  8. Scoping calculation of nuclides migration in engineering barrier system for effect of volume expansion due to overpack corrosion and intrusion of the buffer material

    International Nuclear Information System (INIS)

    Yoshita, Takashi; Ishihara, Yoshinao; Ishiguro, Katsuhiko; Ohi, Takao; Nakajima, Kunihiko

    1999-11-01

    Corrosion of the carbon steel overpack leads to a volume expansion since the specific gravity of corrosion products is smaller than carbon steel. The buffer material is compressed due to the corrosive swelling, reducing its thickness and porosity. On the other hand, buffer material may be extruded into fractures of the surrounding rock and this may lead to a deterioration of the planned functions of the buffer, including retardation of nuclides migration and colloid filtration. In this study, the sensitivity analyses for the effect of volume expansion and intrusion of the buffer material on nuclide migration in the engineering barrier system are carried out. The sensitivity analyses were performed on the decrease in the thickness of the buffer material in the radial direction caused by the corrosive swelling, and the change in the porosity and dry density of the buffer caused by both compacting due to corrosive swelling and intrusion of buffer material. As results, it was found the maximum release rates of relatively shorter half-life nuclides from the outside of the buffer material decreased for taking into account of a volume expansion due to overpack corrosion. On the other hand, the maximum release rates increased when the intrusion of buffer material was also taking into account. It was, however, the maximum release rates of longer half-life nuclides, such as Cs-137 and Np-237, were insensitive to the change of buffer material thickness, and porosity and dry density of buffer. (author)

  9. Tank waste remediation system systems engineering management plan

    International Nuclear Information System (INIS)

    Peck, L.G.

    1998-01-01

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance

  10. Planning, Anticipatory Systems, and Kinds of Actors

    Science.gov (United States)

    Jorna, René; van Wezel, Wout

    2002-09-01

    Anticipation and planning have much in common. Anticipation means being ahead of things. Planning means not only anticipating on things to come, but also trying to determine a course of action to reach a goal. Planning is investigated in many domains, for example, in economy, biology, and in the cognitive sciences. Each of these domains uses its own research methodologies, languages, ontologies, and models. Although there are many differences between the various approaches and models, there must of course also be similarities, since they all deal with establishing a future course of actions to reach a goal. We will compare several planning approaches on a number of aspects, e.g., the kind of entity that makes the plan (natural or artificial), whether the plan is executed by the planner or by another entity, representational issues, and the domain that the plan is executed in. Our article focuses on analytical dimensions in the extended field of planning. We do not discuss empirical results.

  11. Hyperspherical Harmonics Expansion on Lagrange Meshes for Bosonic Systems in One Dimension

    International Nuclear Information System (INIS)

    Timofeyuk, N. K.; Baye, D.

    2017-01-01

    A one-dimensional system of bosons interacting with contact and single-Gaussian forces is studied with an expansion in hyperspherical harmonics. The hyper radial potentials are calculated using the link between the hyperspherical harmonics and the single-particle harmonic-oscillator basis while the coupled hyper radial equations are solved with the Lagrange-mesh method. Extensions of this method are proposed to achieve good convergence with small numbers of mesh points for any truncation of hyper momentum. The convergence with hyper momentum strongly depends on the range of the two-body forces: it is very good for large ranges but deteriorates as the range decreases, being the worst for the contact interaction. In all cases, the lowest-order energy is within 4.5% of the exact solution and shows the correct cubic asymptotic behaviour at large boson numbers. Details of the convergence studies are presented for 3, 5, 20 and 100 bosons. A special treatment for three bosons was found to be necessary. For single-Gaussian interactions, the convergence rate improves with increasing boson number, similar to what happens in the case of three-dimensional systems of bosons. (author)

  12. A Gibbs potential expansion with a quantic system made up of a large number of particles

    International Nuclear Information System (INIS)

    Bloch, Claude; Dominicis, Cyrano de

    1959-01-01

    Starting from an expansion derived in a previous work, we study the contribution to the Gibbs potential of the two-body dynamical correlations, taking into account the statistical correlations. Such a contribution is of interest for low density systems at low temperature. In the zero density limit, it reduces to the Beth Uhlenbeck expression of the second virial coefficient. For a system of fermions in the zero temperature limit, it yields the contribution of the Brueckner reaction matrix to the ground state energy, plus, under certain conditions, additional terms of the form exp. (β |Δ|), where the Δ are the binding energies of 'bound states' of the type first discussed by L. Cooper. Finally, we study the wave function of two particles immersed in a medium (defined by its temperature and chemical potential). lt satisfies an equation generalizing the Bethe Goldstone equation for an arbitrary temperature. Reprint of a paper published in 'Nuclear Physics' 10, 1959, p. 181-196 [fr

  13. Resonant-state expansion applied to three-dimensional open optical systems

    Science.gov (United States)

    Doost, M. Â. B.; Langbein, W.; Muljarov, E. Â. A.

    2014-07-01

    The resonant-state expansion (RSE), a rigorous perturbative method in electrodynamics, is developed for three-dimensional open optical systems. Results are presented using the analytically solvable homogeneous dielectric sphere as unperturbed system. Since any perturbation which breaks the spherical symmetry mixes transverse electric (TE) and transverse magnetic (TM) modes, the RSE is extended here to include TM modes and a zero-frequency pole of the Green's function. We demonstrate the validity of the RSE for TM modes by verifying its convergence towards the exact result for a homogeneous perturbation of the sphere. We then apply the RSE to calculate the modes for a selection of perturbations sequentially reducing the remaining symmetry, given by a change of the dielectric constant of half-sphere and quarter-sphere shape. Since no exact solutions are known for these perturbations, we verify the RSE results by comparing them with the results of state of the art finite element method (FEM) and finite difference in time domain (FDTD) solvers. We find that for the selected perturbations, the RSE provides a significantly higher accuracy than the FEM and FDTD for a given computational effort, demonstrating its potential to supersede presently used methods. We furthermore show that in contrast to presently used methods, the RSE is able to determine the perturbation of a selected group of modes by using a limited basis local to these modes, which can further reduce the computational effort by orders of magnitude.

  14. Designing of network planning system for small-scale manufacturing

    Science.gov (United States)

    Kapulin, D. V.; Russkikh, P. A.; Vinnichenko, M. V.

    2018-05-01

    The paper presents features of network planning in small-scale discrete production. The procedure of explosion of the production order, considering multilevel representation, is developed. The software architecture is offered. Approbation of the network planning system is carried out. This system allows carrying out dynamic updating of the production plan.

  15. A fully defined and scalable 3D culture system for human pluripotent stem cell expansion and differentiation

    Science.gov (United States)

    Lei, Yuguo; Schaffer, David V.

    2013-12-01

    Human pluripotent stem cells (hPSCs), including human embryonic stem cells and induced pluripotent stem cells, are promising for numerous biomedical applications, such as cell replacement therapies, tissue and whole-organ engineering, and high-throughput pharmacology and toxicology screening. Each of these applications requires large numbers of cells of high quality; however, the scalable expansion and differentiation of hPSCs, especially for clinical utilization, remains a challenge. We report a simple, defined, efficient, scalable, and good manufacturing practice-compatible 3D culture system for hPSC expansion and differentiation. It employs a thermoresponsive hydrogel that combines easy manipulation and completely defined conditions, free of any human- or animal-derived factors, and entailing only recombinant protein factors. Under an optimized protocol, the 3D system enables long-term, serial expansion of multiple hPSCs lines with a high expansion rate (∼20-fold per 5-d passage, for a 1072-fold expansion over 280 d), yield (∼2.0 × 107 cells per mL of hydrogel), and purity (∼95% Oct4+), even with single-cell inoculation, all of which offer considerable advantages relative to current approaches. Moreover, the system enabled 3D directed differentiation of hPSCs into multiple lineages, including dopaminergic neuron progenitors with a yield of ∼8 × 107 dopaminergic progenitors per mL of hydrogel and ∼80-fold expansion by the end of a 15-d derivation. This versatile system may be useful at numerous scales, from basic biological investigation to clinical development.

  16. The strategic planning of health management information systems.

    Science.gov (United States)

    Smith, J

    1995-01-01

    This paper discusses the roles and functions of strategic planning of information systems in health services. It selects four specialised methodologies of strategic planning for analysis with respect to their applicability in the health field. It then examines the utilisation of information planning in case studies of three health organisations (two State departments of health and community services and one acute care institution). Issues arising from the analysis concern the planning process, the use to which plans are put, and implications for management.

  17. Planning, anticipatory systems, and kinds of actors

    NARCIS (Netherlands)

    Jorna, R; van Wezel, W; Dubois, DM

    2002-01-01

    Anticipation and planning have much in common. Anticipation means being ahead of things. Planning means not only anticipating on things to come, but also trying to determine a course of action to reach a goal. Planning is investigated in many domains, for example, in economy, biology, and in the

  18. Planning and Design: A Systems Approach.

    Science.gov (United States)

    Bozeman, William C.; Clements, Mary A.

    1981-01-01

    Explains "purpose design," a planning and problem-solving strategy involving determination of planning purposes, generation and selection of solutions, specification of solution details, implementation, and evaluation. Describes the application of purpose design to the planning of an alumni association at Black Hawk College, a community…

  19. Integrated maintenance planning in manufacturing systems

    CERN Document Server

    Al-Turki, Umar M; Yilbas, Bekir Sami; Sahin, Ahmet Ziyaettin

    2014-01-01

    This book introduces the concept of integrated planning for maintenance and production taken into account quality and safety for high global socio-economic impact. It provides insight into the planning process at a global level starting from the business level and ending with the operational level where the plan is implemented and controlled.

  20. WEP. A wind energy planning system

    International Nuclear Information System (INIS)

    Larsen, H.V.

    1991-11-01

    The report describes the Wind Energy Planning system (WEP). It is intended as a decision support system to be used in the economic evaluation of wind energy projects. Such projects could be minor projects with only a single wind turbine or large wind farm projects consisting of several wind turbine plants. In the WEP system, a wind turbine is described by data on initial investment, possible later reinvestments, O and M costs, expected yearly production, life time, and capacity factor. The raising of loans are modelled, too. Depending on which output report is created, the value of the wind generated electricity is calculated in two different ways: either the electricity is assumed to be sold at a price (time series) given by the user, or the alternative conventional power production is modelled by its specific investment, O and M costs, life time, effectivity, fuel mix, and time series for fuel prices. Using these data, capacity credit and saved fuel and O and M costs are calculated. Due to the flexible data structure of the model, the user can easily create a scenario that models a large scale introduction of wind power. In such a scenario the gradual build up through several years of the wind power capacity can be modelled. The report describes in detail the menu structure, the input facilities, the output reports, and the organization of data. Also included is an example with full input documentation and output reports. (au)

  1. Planning regional energy system in association with greenhouse gas mitigation under uncertainty

    Energy Technology Data Exchange (ETDEWEB)

    Li, Y.P.; Huang, G.H. [Research Academy of Energy and Environmental Studies, North China Electric Power University, Beijing 102206 (China); Chen, X. [Key Laboratory of Oasis Ecology and Desert Environment, Xinjiang Institute of Ecology and Geography, Chinese Academy of Sciences, Urumqi, Xinjiang 830011 (China)

    2011-03-15

    Greenhouse gas (GHG) concentrations are expected to continue to rise due to the ever-increasing use of fossil fuels and ever-boosting demand for energy. This leads to inevitable conflict between satisfying increasing energy demand and reducing GHG emissions. In this study, an integrated fuzzy-stochastic optimization model (IFOM) is developed for planning energy systems in association with GHG mitigation. Multiple uncertainties presented as probability distributions, fuzzy-intervals and their combinations are allowed to be incorporated within the framework of IFOM. The developed method is then applied to a case study of long-term planning of a regional energy system, where integer programming (IP) technique is introduced into the IFOM to facilitate dynamic analysis for capacity-expansion planning of energy-production facilities within a multistage context to satisfy increasing energy demand. Solutions related fuzzy and probability information are obtained and can be used for generating decision alternatives. The results can not only provide optimal energy resource/service allocation and capacity-expansion plans, but also help decision-makers identify desired policies for GHG mitigation with a cost-effective manner. (author)

  2. Cell fiber-based three-dimensional culture system for highly efficient expansion of human induced pluripotent stem cells.

    Science.gov (United States)

    Ikeda, Kazuhiro; Nagata, Shogo; Okitsu, Teru; Takeuchi, Shoji

    2017-06-06

    Human pluripotent stem cells are a potentially powerful cellular resource for application in regenerative medicine. Because such applications require large numbers of human pluripotent stem cell-derived cells, a scalable culture system of human pluripotent stem cell needs to be developed. Several suspension culture systems for human pluripotent stem cell expansion exist; however, it is difficult to control the thickness of cell aggregations in these systems, leading to increased cell death likely caused by limited diffusion of gases and nutrients into the aggregations. Here, we describe a scalable culture system using the cell fiber technology for the expansion of human induced pluripotent stem (iPS) cells. The cells were encapsulated and cultured within the core region of core-shell hydrogel microfibers, resulting in the formation of rod-shaped or fiber-shaped cell aggregations with sustained thickness and high viability. By encapsulating the cells with type I collagen, we demonstrated a long-term culture of the cells by serial passaging at a high expansion rate (14-fold in four days) while retaining its pluripotency. Therefore, our culture system could be used for large-scale expansion of human pluripotent stem cells for use in regenerative medicine.

  3. Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System

    Science.gov (United States)

    Court, Laurence E.; Kisling, Kelly; McCarroll, Rachel; Zhang, Lifei; Yang, Jinzhong; Simonds, Hannah; du Toit, Monique; Trauernicht, Chris; Burger, Hester; Parkes, Jeannette; Mejia, Mike; Bojador, Maureen; Balter, Peter; Branco, Daniela; Steinmann, Angela; Baltz, Garrett; Gay, Skylar; Anderson, Brian; Cardenas, Carlos; Jhingran, Anuja; Shaitelman, Simona; Bogler, Oliver; Schmeller, Kathleen; Followill, David; Howell, Rebecca; Nelson, Christopher; Peterson, Christine; Beadle, Beth

    2018-01-01

    The Radiation Planning Assistant (RPA) is a system developed for the fully automated creation of radiotherapy treatment plans, including volume-modulated arc therapy (VMAT) plans for patients with head/neck cancer and 4-field box plans for patients with cervical cancer. It is a combination of specially developed in-house software that uses an application programming interface to communicate with a commercial radiotherapy treatment planning system. It also interfaces with a commercial secondary dose verification software. The necessary inputs to the system are a Treatment Plan Order, approved by the radiation oncologist, and a simulation computed tomography (CT) image, approved by the radiographer. The RPA then generates a complete radiotherapy treatment plan. For the cervical cancer treatment plans, no additional user intervention is necessary until the plan is complete. For head/neck treatment plans, after the normal tissue and some of the target structures are automatically delineated on the CT image, the radiation oncologist must review the contours, making edits if necessary. They also delineate the gross tumor volume. The RPA then completes the treatment planning process, creating a VMAT plan. Finally, the completed plan must be reviewed by qualified clinical staff. PMID:29708544

  4. Reexamining organizational configurations: an update, validation, and expansion of the taxonomy of health networks and systems.

    Science.gov (United States)

    Dubbs, Nicole L; Bazzoli, Gloria J; Shortell, Stephen M; Kralovec, Peter D

    2004-02-01

    To (a) assess how the original cluster categories of hospital-led health networks and systems have changed over time; (b) identify any new patterns of cluster configurations; and (c) demonstrate how additional data can be used to refine and enhance the taxonomy measures. DATA SOURCES; 1994 and 1998 American Hospital Association (AHA) Annual Survey of Hospitals. As in the original taxonomy, separate cluster solutions are identified for health networks and health systems by applying three strategic/structural dimensions (differentiation, integration, and centralization) to three components of the health service/product continuum (hospital services, physician arrangements, and provider-based insurance activities). Factor, cluster, and discriminant analyses are used to analyze the 1998 data. Descriptive and comparative methods are used to analyze the updated 1998 taxonomy relative to the original 1994 version. The 1998 cluster categories are similar to the original taxonomy, however, they reveal some new organizational configurations. For the health networks, centralization of product/service lines is occurring more selectively than in the past. For the health systems, participation has grown in and dispersed across a more diverse set of decentralized organizational forms. For both networks and systems, the definition of centralization has changed over time. In its updated form, the taxonomy continues to provide policymakers and practitioners with a descriptive and contextual framework against which to assess organizational programs and policies. There is a need to continue to revisit the taxonomy from time to time because of the persistent evolution of the U.S. health care industry and the consequent shifting of organizational configurations in this arena. There is also value in continuing to move the taxonomy in the direction of refinement/expansion as new opportunities become available.

  5. Louisiana Airport System Plan Five-Year Capital Improvement Program.

    Science.gov (United States)

    1992-07-01

    The Louisiana Airport System Plan (LASP) Five-Year-Capital Improvement Program (CIP) is a development plan for all commercial service, reliever, and general aviation airports in Louisiana. It is a detailed listing of potential projects based on the a...

  6. The thermal expansion of hard magnetic materials of the Nd-Fe-B system

    Science.gov (United States)

    Savchenko, Igor; Kozlovskii, Yurii; Samoshkin, Dmitriy; Yatsuk, Oleg

    2017-10-01

    The results of dilatometric measurement of the thermal expansion of hard magnetic materials brands N35M, N35H and N35SH containing as a main component the crystalline phase of Nd2Fe14B type are presented. The temperature range from 200 to 750 K has been investigated by the method of dilatometry with an error of 1.5-2×10-7 K-1. The approximation dependences of the linear thermal expansion coefficient have been obtained. The character of changes of the thermal coefficient of linear expansion in the region of the Curie point has been specified, its critical indices and critical amplitudes have been defined.

  7. A system architecture for holonic manufacturing planning and control (EtoPlan)

    NARCIS (Netherlands)

    Wullink, Gerhard; Giebels, M.M.T.; Kals, H.J.J.

    2002-01-01

    In this paper, we present the system architecture of a flexible manufacturing planning and control system, named EtoPlan. The concept is based on the holonic control approach of building multiple and temporary hierarchies (holarchies). This paper describes the system architecture for flexible

  8. Soft system methodology and decision making in community planning system

    OpenAIRE

    Křupka, Jiří; Kašparová, Miloslava; Jirava, Pavel; Mandys, Jan; Ferynová, Lenka; Duplinský, Josef

    2013-01-01

    A model of community planning was defined in this paper. The model was designed for the city of Pardubice and works with real questionnaire research data sets in its evaluation phase. Questionnaires were submitted to fill users, providers and sponsors of social services. When creating the model was used Checkland’s soft system methodology. Also soft computing methods and decision trees were used to create the model. The model was implemented in the data mining tool IBM SPSS Modeler 14.

  9. Capturing the Impact of Storage and Other Flexible Technologies on Electric System Planning

    Energy Technology Data Exchange (ETDEWEB)

    Elaine Hale, Brady Stoll, and Trieu Mai

    2016-05-01

    Power systems of the future are likely to require additional flexibility due to the operating characteristics of many clean energy technologies, particularly those relying on renewable energy sources. This subject has been well studied from an operational perspective, but it has been more difficult to incorporate into capacity expansion models (CEMs) that study investment decisions on the decadal scale. The primary purpose of this report is to present new capabilities that were developed for a particular CEM, NREL's Resource Planning Model (RPM), to better reflect the impact of variable wind and solar generation on system operations and resource adequacy, and, complementarily, to model energy-constrained flexibility resources.

  10. An Ag based brazing system with a tunable thermal expansion for the use as sealant for solid oxide cells

    DEFF Research Database (Denmark)

    Kiebach, Wolff-Ragnar; Engelbrecht, Kurt; Grahl-Madsen, Laila

    2016-01-01

    as a function of the operation temperature were measured. The thermal expansion coefficient in the Ag-Al2TiO5 system can be tailored by varying the amount of the ceramic filler. The brazing process can be carried out in air, the joining partners showed a good chemical stability and sufficient low leak rates...

  11. Polynomial expansion of the precoder for power minimization in large-scale MIMO systems

    KAUST Repository

    Sifaou, Houssem

    2016-07-26

    This work focuses on the downlink of a single-cell large-scale MIMO system in which the base station equipped with M antennas serves K single-antenna users. In particular, we are interested in reducing the implementation complexity of the optimal linear precoder (OLP) that minimizes the total power consumption while ensuring target user rates. As most precoding schemes, a major difficulty towards the implementation of OLP is that it requires fast inversions of large matrices at every new channel realizations. To overcome this issue, we aim at designing a linear precoding scheme providing the same performance of OLP but with lower complexity. This is achieved by applying the truncated polynomial expansion (TPE) concept on a per-user basis. To get a further leap in complexity reduction and allow for closed-form expressions of the per-user weighting coefficients, we resort to the asymptotic regime in which M and K grow large with a bounded ratio. Numerical results are used to show that the proposed TPE precoding scheme achieves the same performance of OLP with a significantly lower implementation complexity. © 2016 IEEE.

  12. Optimal electricity generation system expansion and nuclear power option in Belarus

    International Nuclear Information System (INIS)

    Yakushau, A.; Mikhalevich, A.

    2000-01-01

    After having declared independence, the Republic of Belarus was forced to import 90% of fuel consumed and 25% of electricity. The deficit of peak electric capacity reached 40%. The imported fuel covers the last years because the drop in the production reduced the energy consumption in the Republic but not the needs of the energy sector. Annual payments for imported fuel and electricity are equal to the sum of an annual state budget of Belarus (about 1.5 billion USD) and current debts were not lower 300 million. Comparative analysis of the different scenarios of the electricity generation system expansion showed that an optimum way for electricity generation is installation of the combine cycle units and construction nuclear power plants. The results of the study also showed that the option based on replacement of deficit of the electricity generation by the way of the construction combine cycle units with capacities 450 MW turned out to be the best solution among non nuclear options. (author)

  13. The expansion of the education market and economization of education system: sociological analysis

    Directory of Open Access Journals (Sweden)

    M. V. Klyov

    2015-01-01

    Full Text Available The authors’ attention is drawn to the phenomenon of marketing and economization, and the expansion of the education market. It is noted that universities and research institutes, hospitals and schools, the military and the church, newspapers and television stations, museums and opera houses – all of them are completely different types of organizations, but as well as several others over the past decades were subjects of economization. It is considered the concept of commodification (converting the product into a commodity in relation to subsistence production, quasi­goods, fake goods, real goods and fictitious capital. Overall, it is analyzed the understanding of the market economy of K. Polanyi, the role of information, knowledge and intellect in the post­industrial economy. It is alleged that in such circumstances, knowledge takes the form of the product. As knowledge is collectively produced and hasn’t got any deficiency (from an economic point of view, it is not competitive, it obtains the commodity form, being artificially scarce. The article is observed that the market mindset has a profound impact on the education system: from elementary to high school education goal is to collect as much information as possible for the purposes of the market.

  14. Future Expansion of the Lightning Surveillance System at the Kennedy Space Center and the Cape Canaveral Air Force Station, Florida, USA

    Science.gov (United States)

    Mata, C. T.; Wilson, J. G.

    2012-01-01

    The NASA Kennedy Space Center (KSC) and the Air Force Eastern Range (ER) use data from two cloud-to-ground (CG) lightning detection networks, the Cloud-to-Ground Lightning Surveillance System (CGLSS) and the U.S. National Lightning Detection Network (NLDN), and a volumetric mapping array, the lightning detection and ranging II (LDAR II) system: These systems are used to monitor and characterize lightning that is potentially hazardous to launch or ground operations and hardware. These systems are not perfect and both have documented missed lightning events when compared to the existing lightning surveillance system at Launch Complex 39B (LC39B). Because of this finding it is NASA's plan to install a lightning surveillance system around each of the active launch pads sharing site locations and triggering capabilities when possible. This paper shows how the existing lightning surveillance system at LC39B has performed in 2011 as well as the plan for the expansion around all active pads.

  15. Floquet-Magnus expansion for general N-coupled spins systems in magic-angle spinning nuclear magnetic resonance spectra

    Science.gov (United States)

    Mananga, Eugene Stephane; Charpentier, Thibault

    2015-04-01

    In this paper we present a theoretical perturbative approach for describing the NMR spectrum of strongly dipolar-coupled spin systems under fast magic-angle spinning. Our treatment is based on two approaches: the Floquet approach and the Floquet-Magnus expansion. The Floquet approach is well known in the NMR community as a perturbative approach to get analytical approximations. Numerical procedures are based on step-by-step numerical integration of the corresponding differential equations. The Floquet-Magnus expansion is a perturbative approach of the Floquet theory. Furthermore, we address the " γ -encoding" effect using the Floquet-Magnus expansion approach. We show that the average over " γ " angle can be performed for any Hamiltonian with γ symmetry.

  16. Thermal expansion and temperature variation of elastic constants of Li(H,D) and Na(H,D) systems

    International Nuclear Information System (INIS)

    Islam, A.K.M.A.; Hoque, M.T.

    1994-11-01

    An analysis of thermal expansion of Li(H,D) systems up to melting temperature has been performed using the theory of anharmonic lattice. The study has for the first time been extended to Na(H,D) systems where very little or no data are available. The calculated lattice constants of Li(H,D) systems show quite good agreement with experiment. The success of the present calculation with Li(H,D) and room temperature lattice constant data for Na(H,D) given an indication of the reliability of the computed lattice constants and thermal expansion coefficients for Na(H,D) systems. The study also allows us to predict the hitherto unknown lattice constants of Na(H,D) crystal at 0K. The temperature dependence of elastic constants for Li(H,D) systems has also been evaluated. Comparison with measurements shows the reliability of the present calculations. (author). 45 refs, 4 figs

  17. Development of advanced methods for planning electric energy distribution systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Goenen, T.; Foote, B.L.; Thompson, J.C.; Fagan, J.E.

    1979-10-01

    An extensive search was made for the identification and collection of reports published in the open literature which describes distribution planning methods and techniques. In addition, a questionnaire has been prepared and sent to a large number of electric power utility companies. A large number of these companies were visited and/or their distribution planners interviewed for the identification and description of distribution system planning methods and techniques used by these electric power utility companies and other commercial entities. Distribution systems planning models were reviewed and a set of new mixed-integer programming models were developed for the optimal expansion of the distribution systems. The models help the planner to select: (1) optimum substation locations; (2) optimum substation expansions; (3) optimum substation transformer sizes; (4) optimum load transfers between substations; (5) optimum feeder routes and sizes subject to a set of specified constraints. The models permit following existing right-of-ways and avoid areas where feeders and substations cannot be constructed. The results of computer runs were analyzed for adequacy in serving projected loads within regulation limits for both normal and emergency operation.

  18. Evaluation of margining algorithms in commercial treatment planning systems

    International Nuclear Information System (INIS)

    Pooler, Alistair M.; Mayles, Helen M.; Naismith, Olivia F.; Sage, John P.; Dearnaley, David P.

    2008-01-01

    Introduction: During commissioning of the Pinnacle (Philips) treatment planning system (TPS) the margining algorithm was investigated and was found to produce larger PTVs than Plato (Nucletron) for identical GTVs. Subsequent comparison of PTV volumes resulting from the QA outlining exercise for the CHHIP (Conventional or Hypofractionated High Dose IMRT for Prostate Ca.) trial confirmed that there were differences in TPS's margining algorithms. Margining and the clinical impact of the different PTVs in seven different planning and virtual simulation systems (Pinnacle, Plato, Prosoma (MedCom), Eclipse (7.3 and 7.5) (Varian), MasterPlan (Nucletron), Xio (CMS) and Advantage Windows (AW) (GE)) is investigated, and a simple test for 3D margining consistency is proposed. Methods: Using each TPS, two different sets of prostate GTVs on 2.5 mm and 5 mm slices were margined according to the CHHIP protocol to produce PTV3 (prostate + 5 mm/0 mm post), PTV2 (PTV3 + 5 mm) and PTV1 (prostate and seminal vesicles + 10 mm). GTVs and PTVs were imported into Pinnacle for volume calculation. DVHs for 5 mm slice plans, created using the smallest PTVs, were recalculated on the largest PTV dataset and vice versa. Since adding a margin of 50 mm to a structure should give the same result as adding five margins of 10 mm, this was tested for each TPS (consistency test) using an octahedron as the GTV and CT datasets with 2.5 mm and 5 mm slices. Results: The CHHIP PTV3 and PTV1 volumes had a standard deviation, across the seven systems, of 5% and PTV2 (margined twice) 9%, on the 5 mm slices. For 2.5 mm slices the standard deviations were 4% and 6%. The ratio of the Pinnacle and the Eclipse 7.3 PTV2 volumes was 1.25. Rectal doses were significantly increased when encompassing Pinnacle PTVs (V 50 42.8%), compared to Eclipse 7.3 PTVs (V 50 = 36.4%). Conversely, fields that adequately treated an Eclipse 7.3 PTV2 were inadequate for a Pinnacle PTV2. AW and Plato PTV volumes were the most consistent

  19. Decision support in hierarchical planning systems: The case of procurement planning in oil refining industries

    DEFF Research Database (Denmark)

    Kallestrup, Kasper Bislev; Lynge, Lasse Hadberg; Akkerman, Renzo

    2014-01-01

    In this paper, we discuss the development of decision support systems for hierarchically structured planning approaches, such as commercially available advanced planning systems. We develop a framework to show how such a decision support system can be designed with the existing organization in mind...... and from the perspective of the organizational aspects involved. To exemplify and develop our framework, we use a case study of crude oil procurement planning in the refining industry. The results of the case study indicate an improved organizational embedding of the DSS, leading to significant savings...... in terms of planning efforts and procurement costs. In general, our framework aims to support the continuous improvement of advanced planning systems, increasing planning quality in complex supply chain settings....

  20. Air quality and future energy system planning

    Science.gov (United States)

    Sobral Mourao, Zenaida; Konadu, Dennis; Lupton, Rick

    2016-04-01

    energy system planning. Some example applications of this work are: (1) to discover conflicts and synergies between air quality regulations and future developments in the energy system and land use change; (2) to show the drivers of air quality in a given spatial context; (3) to explore effective ways to visualize impacts of different energy, land use and emissions control policies on air quality. An initial test case for the Bay Area in California will be presented, extending the scope of the existing California ForeseerTM tool to identify impacts of different policies within the water-energy-land nexus on local air quality.

  1. Intelligent control of a planning system for astronaut training.

    Science.gov (United States)

    Ortiz, J; Chen, G

    1999-07-01

    This work intends to design, analyze and solve, from the systems control perspective, a complex, dynamic, and multiconstrained planning system for generating training plans for crew members of the NASA-led International Space Station. Various intelligent planning systems have been developed within the framework of artificial intelligence. These planning systems generally lack a rigorous mathematical formalism to allow a reliable and flexible methodology for their design, modeling, and performance analysis in a dynamical, time-critical, and multiconstrained environment. Formulating the planning problem in the domain of discrete-event systems under a unified framework such that it can be modeled, designed, and analyzed as a control system will provide a self-contained theory for such planning systems. This will also provide a means to certify various planning systems for operations in the dynamical and complex environments in space. The work presented here completes the design, development, and analysis of an intricate, large-scale, and representative mathematical formulation for intelligent control of a real planning system for Space Station crew training. This planning system has been tested and used at NASA-Johnson Space Center.

  2. On treatment of uncertainty in system planning

    International Nuclear Information System (INIS)

    Flage, R.; Aven, T.

    2009-01-01

    In system planning and operation considerable efforts and resources are spent to reduce uncertainties, as a part of project management, uncertainty management and safety management. The basic idea seems to be that uncertainties are purely negative and should be reduced. In this paper we challenge this way of thinking, using a common industry practice as an example. In accordance with this industry practice, three uncertainty interval categories are used: ±40% intervals for the feasibility phase, ±30% intervals for the concept development phase and ±20% intervals for the engineering phase. The problem is that such a regime could easily lead to a conservative management regime encouraging the use of existing methods and tools, as new activities and novel solutions and arrangements necessarily mean increased uncertainties. In the paper we suggest an alternative approach based on uncertainty and risk descriptions, but having no predefined uncertainty reduction structures. The approach makes use of risk assessments and economic optimisation tools such as the expected net present value, but acknowledges the need for broad risk management processes which extend beyond the analyses. Different concerns need to be balanced, including economic aspects, uncertainties and risk, and practicability

  3. Regulatory Impacts on Distributed Generation and Upstream Transmission Substation Expansion Planning: A Novel Stochastic Bi-level Model

    Directory of Open Access Journals (Sweden)

    F. Misaghi

    2017-06-01

    Full Text Available In this paper, a novel framework is proposed to study impacts of regulatory incentive on distributed generation (DG investment in sub-transmission substations, as well as upgrading of upstream transmission substations. Both conventional and wind power technologies are considered here. Investment incentives are fuel cost, firm contracts, capacity payment and investment subsidy relating to wind power. The problem is modelled as a bi-level stochastic optimization problem, where the upper level consists of investor's decisions maximizing its own profit. Both market clearing and decision on upgrading of transmission substation aiming at minimizing the total cost are considered in the lower level. Due to non-convexity of the lower level and impossibility of converting to single level problem (i.e. mathematical programming with equilibrium constraints (MPEC, an algorithm combing enumeration and mathematical optimization is used to tackle with the non-convexity. For each upgrading strategy of substations, a stochastic MPEC, converted to a mixed integer linear programming (MILP is solved. The proposed model is examined on a six-bus and an actual network. Numerical studies confirm that the proposed model can be used for analysing investment behaviour of DGs and substation expansion.

  4. Planning a radar system for protection from the airborne threat

    International Nuclear Information System (INIS)

    Greneker, E.F.; McGee, M.C.

    1986-01-01

    A planning methodology for developing a radar system to protect nuclear materials facilities from the airborne threat is presented. Planning for physical security to counter the airborne threat is becoming even more important because hostile acts by terrorists are increasing and airborne platforms that can be used to bypass physical barriers are readily available. The comprehensive system planning process includes threat and facility surveys, defense hardening, analysis of detection and early warning requirements, optimization of sensor mix and placement, and system implementation considerations

  5. Strategic planning for health care management information systems.

    Science.gov (United States)

    Rosenberger, H R; Kaiser, K M

    1985-01-01

    Using a planning methodology and a structured design technique for analyzing data and data flow, information requirements can be derived to produce a strategic plan for a management information system. Such a long-range plan classifies information groups and assigns them priorities according to the goals of the organization. The approach emphasizes user involvement.

  6. Slovenian spatial planning system: Key changes of past decade

    Directory of Open Access Journals (Sweden)

    Lavrenčić Valentina

    2002-01-01

    Full Text Available Spatial planning has a long tradition in Slovenia. It was always a part of the integrated planning process, first institutionalized in 1968. The planning system was quite unique, combining economic, social, and spatial aspects in one, a so called long-term and medium-term social plan. At the national level its spatial part consisted of the national spatial plan, the defining concept for settlement management and growth, public service delivery, use of space and landscape transformation, protection of the environment, and guidelines for conflict management. Today, this form of planning is substituted by the national strategies and programs of each sector.

  7. An radiotoxicity evaluation of high level wastes for a scenery of Brazilian Nuclear Power Plants in accordance with the Energy Expansion Brazilian Plan 2030

    International Nuclear Information System (INIS)

    Guilhem, Andres C.; Maiorino, Jose R.

    2011-01-01

    This paper is a part of the author scientific initiation, and makes an evaluation of the radiotoxicity which would be produced by the Brazilian nuclear power plants in a scenery of 7 power plants operating in 2030, in according to the official expansion plans which point out the additional introduction of 4000 MW(e), or 4 ne power plant additionally to the Angra I, II and III. Considering that all reactors would be a PWR reactors. The calculated parameter was the relative toxicity of the low and intermediate level nuclear wastes (LLPP - long lived fission products and HLW - high level waste related to the radiotoxicity of natural uranium versus time. All the calculation used the ORIGEN-S code. (author)

  8. Model of strategic planning in active systems | Nasim | Journal of ...

    African Journals Online (AJOL)

    Annotation The work is dedicated to the mathematical formulation of the needing for strategic planning in active systems. At the same time, the possibility of the TAC (theory of active systems) for an assessment of conditions of effective strategic planning and development of an active system are shown. Keywords Active ...

  9. Tourism and recreation system planning in Alberta provincial parks

    Science.gov (United States)

    Paul F.J. Eagles; Angela M. Gilmore; Luis X. Huang; Denise A. Keltie; Kimberley Rae; Hong Sun; Amy K. Thede; Meagan L. Wilson; Jennifer A. Woronuk; Ge Yujin

    2007-01-01

    Traditionally, system planning in parks and protected areas concentrated on biogeographical concepts, while neglecting tourism and recreation. The existing system plan for parks and protected areas in Alberta, Canada, divides the province into six natural regions based on a geographic classifi cation system (Grassland, Parkland, Foothills, Rocky Mountains, Boreal...

  10. A Sociotechnical Systems Approach To Coastal Marine Spatial Planning

    Science.gov (United States)

    2016-12-01

    SYSTEMS APPROACH TO COASTAL MARINE SPATIAL PLANNING by Tyler B. McDonald December 2016 Thesis Advisor: Karen Holness Co-Advisor: Tom...2016 3. REPORT TYPE AND DATES COVERED Master’s thesis 4. TITLE AND SUBTITLE A SOCIOTECHNICAL SYSTEMS APPROACH TO COASTAL MARINE SPATIAL PLANNING...engineering perspective and specifically used a sociotechnical systems approach . The research investigated aquaculture permitting from the

  11. Planning a transportation system for US Defense Transuranic waste

    International Nuclear Information System (INIS)

    Gilbert, K.V.; Hurley, J.D.; Smith, L.J.; McFadden, M.H.; Raudenbush, M.H.; Fedie, M.L.

    1983-05-01

    The development and planning of a transportation system for US Department of Energy (USDOE) Defense Transuranic (TRU) waste has required the talents and expertise of many people. Coordination activities, design activities, fabrication, research and development, operations, and transportation are but a few of the areas around which this system is built. Due to the large number of organizations, regulations and personalities the planning task becomes extremely complex. The intent of this paper is to discuss the steps taken in planning this system, to identify the various organizations around which this system is designed, and to discuss program progress to date, scheduling, and future plans. 9 figures, 1 table

  12. Preliminary Validation and Verification Plan for CAREM Reactor Protection System

    International Nuclear Information System (INIS)

    Fittipaldi, Ana; Maciel Felix

    2000-01-01

    The purpose of this paper, is to present a preliminary validation and verification plan for a particular architecture proposed for the CAREM reactor protection system with software modules (computer based system).These software modules can be either own design systems or systems based in commercial modules such as programmable logic controllers (PLC) redundant of last generation.During this study, it was seen that this plan can also be used as a validation and verification plan of commercial products (COTS, commercial off the shelf) and/or smart transmitters.The software life cycle proposed and its features are presented, and also the advantages of the preliminary validation and verification plan

  13. Planning a transportation system for US defense transuranic waste

    International Nuclear Information System (INIS)

    Gilbert, K.V.; Hurley, J.D.; Smith, L.J.; McFadden, M.H.; Raudenbush, M.H.; Fedie, M.L.

    1983-01-01

    The development and planning of a transportation system for US Department of Energy (USDOE) Defense Transuranic (TRU) waste has required the talents and expertise of many people. Coordination activities, design activities, fabrication, research and development, operations, and transportation are but a few of the areas around which this system is built. Due to the large number of organizations, regulations and personalities the planning task becomes extremely complex. The intent of this paper is to discuss the steps taken in planning this system, to identify the various organizations around which this system is designed, and to discuss program progress to date, scheduling, and future plans

  14. The availability of the step optimization in Monaco planning system

    International Nuclear Information System (INIS)

    Kim, Dae Sup

    2014-01-01

    We present a method to reduce this gap and complete the treatment plan, to be made by the re-optimization is performed in the same conditions as the initial treatment plan different from Monaco treatment planning system. The optimization is carried in two steps when performing the inverse calculation for volumetric modulated radiation therapy or intensity modulated radiation therapy in Monaco treatment planning system. This study was the first plan with a complete optimization in two steps by performing all of the treatment plan, without changing the optimized condition from Step 1 to Step 2, a typical sequential optimization performed. At this time, the experiment was carried out with a pencil beam and Monte Carlo algorithm is applied In step 2. We compared initial plan and re-optimized plan with the same optimized conditions. And then evaluated the planning dose by measurement. When performing a re-optimization for the initial treatment plan, the second plan applied the step optimization. When the common optimization again carried out in the same conditions in the initial treatment plan was completed, the result is not the same. From a comparison of the treatment planning system, similar to the dose-volume the histogram showed a similar trend, but exhibit different values that do not satisfy the conditions best optimized dose, dose homogeneity and dose limits. Also showed more than 20% different in comparison dosimetry. If different dose algorithms, this measure is not the same out. The process of performing a number of trial and error, and you get to the ultimate goal of treatment planning optimization process. If carried out to optimize the completion of the initial trust only the treatment plan, we could be made of another treatment plan. The similar treatment plan could not satisfy to optimization results. When you perform re-optimization process, you will need to apply the step optimized conditions, making sure the dose distribution through the optimization

  15. Uncertainty Evaluation of the Thermal Expansion of Gd2O3-ZrO2 with a System Calibration Factor

    International Nuclear Information System (INIS)

    Park, Chang Je; Kang, Kweon Ho; Na, Sang Ho; Song, Kee Chan

    2007-01-01

    Both gadolinia (Gd 2 O 3 ) and zirconia (ZrO 2 ) are widely used in the nuclear industry, including a burnable absorber and additives in the fabrication of a simulated fuel. Thermal expansions of a mixture of gadolinia (Gd 2 O 3 ) 20 mol% and zirconia (ZrO 2 ) 80 mol% were measured by using a dilatometer (DIL402C) from room temperature to 1500 .deg. C. Uncertainties in the measurement should be quantified based on statistics. Referring to the ISO (International Organization for Standardization) guide, the uncertainties of the thermal expansion were quantified for three parts - the initial length, the length variation, and the system calibration factor. The whole system, the dilatometer, is composed of many complex sub-systems and in fact it is difficult to consider all the uncertainties of the sub-systems. Thus, the system calibration factor was introduced with a standard material for the uncertainty evaluation. In this study, a new system calibration factor was formulated in a multiplicative way. Further, the effect of calibration factor with random deviation was investigated for the uncertainty evaluation of a thermal expansion

  16. Design and Installation of Irrigation System for the Expansion of Sugar cane- Industries in Ahvaz, IRAN.

    Science.gov (United States)

    Afshari, E.; Afshari, S.

    2005-12-01

    This paper presents achievements of a twelve years ongoing project expansion of sugar cane- industries as a major agricultural development in Ahvaz, IRAN. The entire project is divided in to seven units and each unit provides irrigation water for 30,000 acres of sugar cane farms in Ahwaz. Absou Inc. is one of the consulting firms that is in charge of design and overseeing installation of irrigation system as well as the development of lands for sugar-cane cultivation at one of the units, called Farabi unit .In general, the mission of project is to Pump fresh water from Karoon River and direct it to the sugar cane farm for irrigation. In particular, the task of design and installation include, (1) build a pumping station at Karoon River with capacity of 1271 ft3/sec, (2) transfer water by main channel from Karoon rive to the farm site 19 miles (3) install a secondary pumping stations which direct water from main channel to drainage pipes and provides water for local farms (4) build a secondary channels which carries water with pipe lines with total length of 42 miles and diameter of 16 to 32 inch. (5) install drainage pump stations and collectors (6) level the ground surface and prepare it for irrigation (7) build railroad for carrying sugar canes (23 miles). Thus far, more than 15,000 acres of farm in Farabi unit is under sugar cane cultivation. The presentation will illustrate more details about different aspects of the project including design, installation and construction phases.

  17. Bioreactor systems for tissue engineering II. Strategies for the expansion and directed differentiation of stem cells

    Energy Technology Data Exchange (ETDEWEB)

    Kasper, Cornelia [Hannover Univ. (Germany). Inst. fuer Technische Chemie; Griensven, Martijn van [Ludwig Boltzmann Institut fuer Klinische und Experimentelle Traumatologie, Wien (Austria); Poertner, Ralf (eds.) [Technische Univ. Hamburg-Harburg (Germany). Inst. Biotechnologie und Verfahrenstechnik

    2010-07-01

    Alternative Sources of Adult Stem Cells: Human Amniotic Membrane, by S. Wolbank, M. van Griensven, R. Grillari-Voglauer, and A. Peterbauer-Scherb; - Mesenchymal Stromal Cells Derived from Human Umbilical Cord Tissues: Primitive Cells with Potential for Clinical and Tissue Engineering Applications, by P. Moretti, T. Hatlapatka, D. Marten, A. Lavrentieva, I. Majore, R. Hass and C. Kasper; - Isolation, Characterization, Differentiation, and Application of Adipose-Derived Stem Cells, by J. W. Kuhbier, B. Weyand, C. Radtke, P. M. Vogt, C. Kasper and K. Reimers; - Induced Pluripotent Stem Cells: Characteristics and Perspectives, by T. Cantz and U. Martin; - Induced Pluripotent Stem Cell Technology in Regenerative Medicine and Biology, by D. Pei, J. Xu, Q. Zhuang, H.-F. Tse and M. A. Esteban; - Production Process for Stem Cell Based Therapeutic Implants: Expansion of the Production Cell Line and Cultivation of Encapsulated Cells, by C. Weber, S. Pohl, R. Poertner, P. Pino-Grace, D. Freimark, C. Wallrapp, P. Geigle and P. Czermak; - Cartilage Engineering from Mesenchymal Stem Cells, by C. Goepfert, A. Slobodianski, A.F. Schilling, P. Adamietz and R. Poertner; - Outgrowth Endothelial Cells: Sources, Characteristics and Potential Applications in Tissue Engineering and Regenerative Medicine, by S. Fuchs, E. Dohle, M. Kolbe, C. J. Kirkpatrick; - Basic Science and Clinical Application of Stem Cells in Veterinary Medicine, by I. Ribitsch, J. Burk, U. Delling, C. Geissler, C. Gittel, H. Juelke, W. Brehm; - Bone Marrow Stem Cells in Clinical Application: Harnessing Paracrine Roles and Niche Mechanisms, by R. M. El Backly, R. Cancedda; - Clinical Application of Stem Cells in the Cardiovascular System, C. Stamm, K. Klose, Y.-H. Choi. (orig.)

  18. The thermal expansion of hard magnetic materials of the Nd-Fe-B system

    Directory of Open Access Journals (Sweden)

    Savchenko Igor

    2017-01-01

    Full Text Available The results of dilatometric measurement of the thermal expansion of hard magnetic materials brands N35M, N35H and N35SH containing as a main component the crystalline phase of Nd2Fe14B type are presented. The temperature range from 200 to 750 K has been investigated by the method of dilatometry with an error of 1.5-2×10-7 K-1. The approximation dependences of the linear thermal expansion coefficient have been obtained. The character of changes of the thermal coefficient of linear expansion in the region of the Curie point has been specified, its critical indices and critical amplitudes have been defined.

  19. Network expansion by a proactive transmission system operator: A case study

    International Nuclear Information System (INIS)

    Groppi, Angelamaria; Fumagalli, Elena

    2014-01-01

    Complex planning procedures often amplify the difference in investment time between generation and transmission. In this work we consider a transmission project in Italy and, relying on a recently proposed methodology, we compare costs and benefits of anticipating the planning process before the connection of new power plants becomes certain. Whereas the system faces lower congestion costs if the network is reinforced immediately, anticipation constitutes a sunk cost in case generation is not built. For realistic load and generation scenarios, anticipation costs, as well as differences in investment times, our results indicate that anticipation is the most efficient choice for a relatively low connection probability. Analyses of this sort are particularly relevant in light of the increasing complexity of public engagement processes and of the remarkable growth in renewable generation. - Highlights: • Delays in transmission investments can increase congestion costs. • Anticipating a transmission upgrade before a generator connects has costs/benefits. • Case study: real-life transmission project in the North of Italy. • Anticipation is the efficient choice under several scenarios

  20. Dosimetry audit of radiotherapy treatment planning systems

    International Nuclear Information System (INIS)

    Bulski, Wojciech; Chelminski, Krzysztof; Rostkowska, Joanna

    2015-01-01

    In radiotherapy Treatment Planning Systems (TPS) various calculation algorithms are used. The accuracy of dose calculations has to be verified. Numerous phantom types, detectors and measurement methodologies are proposed to verify the TPS calculations with dosimetric measurements. A heterogeneous slab phantom has been designed within a Coordinated Research Project (CRP) of the IAEA. The heterogeneous phantom was developed in the frame of the IAEA CRP. The phantom consists of frame slabs made with polystyrene and exchangeable inhomogeneity slabs equivalent to bone or lung tissue. Special inserts allow to position thermoluminescent dosimeters (TLD) capsules within the polystyrene slabs below the bone or lung equivalent slabs and also within the lung equivalent material. Additionally, there are inserts that allow to position films or ionisation chamber in the phantom. Ten Polish radiotherapy centres (of 30 in total) were audited during on-site visits. Six different TPSs and five calculation algorithms were examined in the presence of inhomogeneities. Generally, most of the results from TLD were within 5 % tolerance. Differences between doses calculated by TPSs and measured with TLD did not exceed 4 % for bone and polystyrene equivalent materials. Under the lung equivalent material, on the beam axis the differences were lower than 5 %, whereas inside the lung equivalent material, off the beam axis, in some cases they were of around 7 %. The TLD results were confirmed with the ionisation chamber measurements. The comparison results of the calculations and the measurements allow to detect limitations of TPS calculation algorithms. The audits performed with the use of heterogeneous phantom and TLD seem to be an effective tool for detecting the limitations in the TPS performance or beam configuration errors at audited radiotherapy departments. (authors)

  1. Dosimetry audit of radiotherapy treatment planning systems.

    Science.gov (United States)

    Bulski, Wojciech; Chełmiński, Krzysztof; Rostkowska, Joanna

    2015-07-01

    In radiotherapy Treatment Planning Systems (TPS) various calculation algorithms are used. The accuracy of dose calculations has to be verified. Numerous phantom types, detectors and measurement methodologies are proposed to verify the TPS calculations with dosimetric measurements. A heterogeneous slab phantom has been designed within a Coordinated Research Project (CRP) of the IAEA. The heterogeneous phantom was developed in the frame of the IAEA CRP. The phantom consists of frame slabs made with polystyrene and exchangeable inhomogeneity slabs equivalent to bone or lung tissue. Special inserts allow to position thermoluminescent dosimeters (TLD) capsules within the polystyrene slabs below the bone or lung equivalent slabs and also within the lung equivalent material. Additionally, there are inserts that allow to position films or ionisation chamber in the phantom. Ten Polish radiotherapy centres (of 30 in total) were audited during on-site visits. Six different TPSs and five calculation algorithms were examined in the presence of inhomogeneities. Generally, most of the results from TLD were within 5 % tolerance. Differences between doses calculated by TPSs and measured with TLD did not exceed 4 % for bone and polystyrene equivalent materials. Under the lung equivalent material, on the beam axis the differences were lower than 5 %, whereas inside the lung equivalent material, off the beam axis, in some cases they were of around 7 %. The TLD results were confirmed with the ionisation chamber measurements. The comparison results of the calculations and the measurements allow to detect limitations of TPS calculation algorithms. The audits performed with the use of heterogeneous phantom and TLD seem to be an effective tool for detecting the limitations in the TPS performance or beam configuration errors at audited radiotherapy departments. © The Author 2015. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  2. THE DEFENSE PLANNING SYSTEMS AND THEIR IMPLICATIONS

    Directory of Open Access Journals (Sweden)

    Laszlo STICZ

    2010-01-01

    Full Text Available Defense planning in the Alliance is a fundamental element of the arrangements which enable its member countries to enjoy the crucial political, military and resource advantages of collective defense and other common military efforts to enhance security and stability. In this respect, the aim of this paper is to outline the role of the Armed Forces and the specific processes aiming to achieve the ultimate goal of a nation regarding national security, with focus on defense planning and the PDPS.

  3. Expert system for aiding fuel exchange planning

    International Nuclear Information System (INIS)

    Shiratori, Yoshitake.

    1992-01-01

    A fuel exchange plan is prepared based on intelligence bases such as a method of zoning a reactor core, a fuel arrangement rule and a procedure for fuel exchange, as well as initial data. Then, the fuel exchange plans are patterned to several groups based on the intelligence bases such as patterning of fuel arrangement. A typical pattern is analyzed by a reactor core analyzing code and allowance or rejection for the analyzed patterns is judged based on intelligence bases regarding life time of the reactor core, thermal limit value of fuels, burning of fuel for irradiation test. The result of the judgement is fed-back as an estimation information and the initial data and the intelligence data are added to prepare a plan again. A similar analysis is also conducted for the plan of the rejected group. The allowance or rejection is judged for all of the plans in the same manner. The intelligence bases are used and the result of the judgement is fed-back as a condition for estimation, thereby enabling to remarkably save labors and time and prepare non-typical exchange plans. (N.H.)

  4. Early warning monitoring system of modular expansion joints based on dynamic behaviour

    NARCIS (Netherlands)

    Peelen, W.H.A.; Vervuurt, A.H.J.M.; Zuada Coelho, B.E.; Leendertz, H.

    2012-01-01

    One of the existing modular expansion joints of the Martinus Nijhoff Bridge in the Netherlands was monitored with the purpose of extending its service life for on year until replacement in 2011. Based on an analysis of the failure mechanisms of this (type of) joint, strain gauges were used as

  5. 2: Local area networks as a multiprocessor treatment planning system

    International Nuclear Information System (INIS)

    Neblett, D.L.; Hogan, S.E.

    1987-01-01

    The creation of a local area network (LAN) of interconnected computers provides an environment of multi computer processors that adds a new dimension to treatment planning. A LAN system provides the opportunity to have two or more computers working on the plan in parallel. With high speed interprocessor transfer, events such as the time consuming task of correcting several individual beams for contours and inhomogeneities can be performed simultaneously; thus, effectively creating a parallel multiprocessor treatment planning system

  6. Evaluation of IMRT plans of prostate carcinoma from four treatment planning systems based on Monte Carlo

    International Nuclear Information System (INIS)

    Chi Zifeng; Han Chun; Liu Dan; Cao Yankun; Li Runxiao

    2011-01-01

    Objective: With the Monte Carlo method to recalculate the IMRT dose distributions from four TPS to provide a platform for independent comparison and evaluation of the plan quality.These results will help make a clinical decision as which TPS will be used for prostate IMRT planning. Methods: Eleven prostate cancer cases were planned with the Corvus, Xio, Pinnacle and Eclipse TPS. The plans were recalculated by Monte Carlo using leaf sequences and MUs for individual plans. Dose-volume-histograms and isodose distributions were compared. Other quantities such as D min (the minimum dose received by 99% of CTV/PTV), D max (the maximum dose received by 1% of CTV/PTV), V 110% , V 105% , V 95% (the volume of CTV/PTV receiving 110%, 105%, 95% of the prescription dose), the volume of rectum and bladder receiving >65 Gy and >40 Gy, and the volume of femur receiving >50 Gy were evaluated. Total segments and MUs were also compared. Results: The Monte Carlo results agreed with the dose distributions from the TPS to within 3%/3 mm. The Xio, Pinnacle and Eclipse plans show less target dose heterogeneity and lower V 65 and V 40 for the rectum and bladder compared to the Corvus plans. The PTV D min is about 2 Gy lower for Xio plans than others while the Corvus plans have slightly lower female head V 50 (0.03% and 0.58%) than others. The Corvus plans require significantly most segments (187.8) and MUs (1264.7) to deliver and the Pinnacle plans require fewest segments (82.4) and MUs (703.6). Conclusions: We have tested an independent Monte Carlo dose calculation system for dose reconstruction and plan evaluation. This system provides a platform for the fair comparison and evaluation of treatment plans to facilitate clinical decision making in selecting a TPS and beam delivery system for particular treatment sites. (authors)

  7. Setting planned leadtimes in customer-order-driven assembly systems

    NARCIS (Netherlands)

    Atan, Z.; Kok, de A.G.; Dellaert, N.P.; Janssen, F.B.S.L.P.; Boxel, van R.

    2016-01-01

    We study an assembly system with a number of parallel multistage processes feeding a multistage final assembly process. Each stage has a stochastic throughput time. We assume that the system is controlled by planned leadtimes at each stage. From these planned leadtimes the start and due times of all

  8. Information security management system planning for CBRN facilities

    International Nuclear Information System (INIS)

    Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.; Glantz, Clifford S.; Landine, Guy P.; Bryant, Janet L.; Lewis, John; Mathers, Gemma; Rodger, Robert; Johnson, Christopher

    2015-01-01

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  9. Information security management system planning for CBRN facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lenaeu, Joseph D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); O' Neil, Lori Ross [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Leitch, Rosalyn M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Glantz, Clifford S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Landine, Guy P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bryant, Janet L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lewis, John [National Nuclear Lab., Workington (United Kingdom); Mathers, Gemma [National Nuclear Lab., Workington (United Kingdom); Rodger, Robert [National Nuclear Lab., Workington (United Kingdom); Johnson, Christopher [National Nuclear Lab., Workington (United Kingdom)

    2015-12-01

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  10. Succession Planning in a Two-Year Technical College System

    Science.gov (United States)

    Neefe, Diane Osterhaus

    2009-01-01

    The study explores the organizational characteristics of strategic planning, succession planning and career management and the processes impact on the hiring location of academic leaders from within the college, external to the college but within the system, and external to the system. The study was conducted in the 16 college Wisconsin…

  11. Expansive failure reactions and their prevention in the encapsulation of phenol formaldehyde type ion exchange resins in cement based systems

    Energy Technology Data Exchange (ETDEWEB)

    Constable, M.; Howard, C.G.; Johnson, M.A.; Jolliffe, C.B. (AEA Decommissioning and Waste Management, Winfrith (United Kingdom)); Sellers, R.M. (Nuclear Electric plc, Barnwood (United Kingdom))

    1992-01-01

    Lewatit DN is a phenol formaldehyde based ion exchange resin used to remove radioactive caesium from liquid waste streams such as fuel cooling ponds and effluents. This paper presents the results of a study of the encapsulation of the bead form of the resin in cement with particular reference to the mechanisms of its interaction with the encapsulant. When incorporated in pure ordinary Portland cement (OPC) at loadings in excess of 15 wt % an unstable product results due to expansion of the systems and at higher waste loadings failure results after only a few days. Evidence from differential scanning calorimetry, X-ray diffraction and scanning electron microscopy all indicate the cause of the expansive reaction to be the formation of crystals of calcium salts around and within the resin beads. Addition of BFS and sodium hydroxide prevent the formation of these salts by removal of calcium hydroxide from the system in other reactions. (author).

  12. Enterprise Architecture Planning in developing A planning Information System: a Case Study of Semarang State University

    Directory of Open Access Journals (Sweden)

    Budiman Kholiq

    2018-01-01

    Full Text Available This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system

  13. Enterprise Architecture Planning in developing A planning Information System: a Case Study of Semarang State University

    Science.gov (United States)

    Budiman, Kholiq; Prahasto, Toni; Kusumawardhani, Amie

    2018-02-01

    This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system can motivate the

  14. Knowledge-based treatment planning and its potential role in the transition between treatment planning systems.

    Science.gov (United States)

    Masi, Kathryn; Archer, Paul; Jackson, William; Sun, Yilun; Schipper, Matthew; Hamstra, Daniel; Matuszak, Martha

    2017-11-22

    Commissioning a new treatment planning system (TPS) involves many time-consuming tasks. We investigated the role that knowledge-based planning (KBP) can play in aiding a clinic's transition to a new TPS. Sixty clinically treated prostate/prostate bed intensity-modulated radiation therapy (IMRT) plans were exported from an in-house TPS and were used to create a KBP model in a newly implemented commercial application. To determine the benefit that KBP may have in a TPS transition, the model was tested on 2 groups of patients. Group 1 consisted of the first 10 prostate/prostate bed patients treated in the commercial TPS after the transition from the in-house TPS. Group 2 consisted of 10 patients planned in the commercial TPS after 8 months of clinical use. The KBP-generated plan was compared with the clinically used plan in terms of plan quality (ability to meet planning objectives and overall dose metrics) and planning efficiency (time required to generate clinically acceptable plans). The KBP-generated plans provided a significantly improved target coverage (p = 0.01) compared with the clinically used plans for Group 1, but yielded plans of comparable target coverage to the clinically used plans for Group 2. For the organs at risk, the KBP-generated plans produced lower doses, on average, for every normal-tissue objective except for the maximum dose to 0.1 cc of rectum. The time needed for the KBP-generated plans ranged from 6 to 15 minutes compared to 30 to 150 and 15 to 60 minutes for manual planning in Groups 1 and 2, respectively. KBP is a promising tool to aid in the transition to a new TPS. Our study indicates that high-quality treatment plans could have been generated in the newly implemented TPS more efficiently compared with not using KBP. Even after 8 months of the clinical use, KBP still showed an increase in plan quality and planning efficiency compared with manual planning. Copyright © 2017 American Association of Medical Dosimetrists. Published

  15. Thermal expansion

    International Nuclear Information System (INIS)

    Yun, Y.

    2015-01-01

    Thermal expansion of fuel pellet is an important property which limits the lifetime of the fuels in reactors, because it affects both the pellet and cladding mechanical interaction and the gap conductivity. By fitting a number of available measured data, recommended equations have been presented and successfully used to estimate thermal expansion coefficient of the nuclear fuel pellet. However, due to large scatter of the measured data, non-consensus data have been omitted in formulating the equations. Also, the equation is strongly governed by the lack of appropriate experimental data. For those reasons, it is important to develop theoretical methodologies to better describe thermal expansion behaviour of nuclear fuel. In particular, first-principles and molecular dynamics simulations have been certainly contributed to predict reliable thermal expansion without fitting the measured data. Furthermore, the two theoretical techniques have improved on understanding the change of fuel dimension by describing the atomic-scale processes associated with lattice expansion in the fuels. (author)

  16. Software Configuration Management Plan for the Sodium Removal System

    International Nuclear Information System (INIS)

    HILL, L.F.

    2000-01-01

    This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test

  17. Extended Jacobi Elliptic Function Rational Expansion Method and Its Application to (2+1)-Dimensional Stochastic Dispersive Long Wave System

    International Nuclear Information System (INIS)

    Song Lina; Zhang Hongqing

    2007-01-01

    In this work, by means of a generalized method and symbolic computation, we extend the Jacobi elliptic function rational expansion method to uniformly construct a series of stochastic wave solutions for stochastic evolution equations. To illustrate the effectiveness of our method, we take the (2+1)-dimensional stochastic dispersive long wave system as an example. We not only have obtained some known solutions, but also have constructed some new rational formal stochastic Jacobi elliptic function solutions.

  18. Feasibility Analysis of a Seabed Filtration Intake System for the Shoaiba III Expansion Reverse Osmosis Plant

    KAUST Repository

    Rodríguez, Luis Raúl

    2012-06-01

    The ability to economically desalinate seawater in arid regions of the world has become a vital advancement to overcome the problem on freshwater availability, quality, and reliability. In contrast with the major capital and operational costs for desalination plants represented by conventional open ocean intakes, subsurface intakes allow the extraction of high quality feed water at minimum costs and reduced environmental impact. A seabed filter is a subsurface intake that consists of a submerged slow sand filter, with benefits of organic matter removal and pathogens, and low operational cost. A site investigation was carried out through the southern coast of the Red Sea in Saudi Arabia, from King Abdullah University of Science and Technology down to 370 kilometers south of Jeddah. A site adjacent to the Shoaiba desalination plant was selected to assess the viability of constructing a seabed filter. Grain sieve size analysis, porosity and hydraulic conductivity permeameter measurements were performed on the collected sediment samples. Based on these results, it was concluded that the characteristics at the Shoaiba site allow for the construction of a seabed filtration system. A seabed filter design is proposed for the 150,000 m3/d Shoaiba III expansion project, a large-scale Reverse Osmosis desalination plant. A filter design with a filtration rate of 7 m/d through an area of 6,000 m2 is proposed to meet the demand of one of the ten desalination trains operating at the plant. The filter would be located 90 meters offshore where hydraulic conductivity of the sediment is high, and mud percentage is minimal. The thin native marine sediment layer is insufficient to provide enough water filtration, and consequently the proposed solution involves excavating the limestone rock and filling it with different layers of non-native sand and gravel of increasing grain size. An initial assessment of the area around Shoaiba showed similar sedimentological conditions that could

  19. Planning Cultures and Histories: Influences on the Evolution of Planning Systems and Spatial Development Patterns

    NARCIS (Netherlands)

    Stead, D.; de Vries, J.; Tasan-Kok, T.

    2015-01-01

    This special issue addresses the influences of planning cultures and histories on the evolution of planning systems and spatial development. As well as providing an international comparative perspective on these issues, the collection of articles also engages in a search for new conceptual

  20. Towards an integration of process planning and production planning and control for flexible manufacturing systems

    NARCIS (Netherlands)

    Gaalman, GJC; Slomp, J; Suresh, NC

    This introduction article attempts to present some major issues relating to the integration of process planning and production planning and control (PPC) for flexible manufacturing systems (FMSs). It shows that the performance of an FMS can be significantly improved and FMS capabilities more

  1. Planning Security Services for IT Systems

    OpenAIRE

    Henderson, Marie; Page, Howard Philip

    2014-01-01

    Often the hardest job is to get business representatives to look at security as something that makes managing their risks and achieving their objectives easier, with security compliance as just part of that journey. This paper addresses that by making planning for security services a 'business tool'.

  2. A Method for Transmission Network Expansion Planning : A Monte-Carlo and Lagrangian Multiplier-based Optimisation Approach

    NARCIS (Netherlands)

    Liu, Z.

    2014-01-01

    Power systems conventionally have been designed and operated to facilitate electrical energy transportation from large centralised power plants to distant load centres. It is currently under development towards the purpose of being able to facilitate more distributed generation from renewable energy

  3. Spatial modelling and ecosystem accounting for land use planning: addressing deforestation and oil palm expansion in Central Kalimantan, Indonesia

    NARCIS (Netherlands)

    Sumarga, E.

    2015-01-01

    Ecosystem accounting is a new area of environmental economic accounting that aims to measure ecosystem services in a way that is in line with national accounts. The key characteristics of ecosystem accounting include the extension of the valuation boundary of the System of National Accounts,

  4. Integrating Robot Task Planning into Off-Line Programming Systems

    DEFF Research Database (Denmark)

    Sun, Hongyan; Kroszynski, Uri

    1988-01-01

    a system architecture for integrated robot task planning. It identifies and describes the components considered necessary for implementation. The focus is on functionality of these elements as well as on the information flow. A pilot implementation of such an integrated system architecture for a robot......The addition of robot task planning in off-line programming systems aims at improving the capability of current state-of-the-art commercially available off-line programming systems, by integrating modeling, task planning, programming and simulation together under one platform. This article proposes...... assembly task is discussed....

  5. European franchise expansion into Latin America. Evidences from the Spanish franchise system

    OpenAIRE

    Baena Graciá, Verónica; Cerviño Fernández, Julio

    2014-01-01

    This study aims to enhance the knowledge that managers and scholars have on franchising expansion. In this sense, it is worth mentioning that although the body of literature on international management focusing on emerging markets is growing, the attention paid to the Latin American context continues to be limited. This is surprising given the substantive economic importance of the region with a population over 590 million, and a gross domestic product of approximately US$5 trillion. To cover...

  6. Spatial modelling and ecosystem accounting for land use planning: addressing deforestation and oil palm expansion in Central Kalimantan, Indonesia

    OpenAIRE

    Sumarga, E.

    2015-01-01

    Ecosystem accounting is a new area of environmental economic accounting that aims to measure ecosystem services in a way that is in line with national accounts. The key characteristics of ecosystem accounting include the extension of the valuation boundary of the System of National Accounts, allowing the inclusion of a broader set of ecosystem services types such regulating services and cultural services. Consistent with the principles of national account, ecosystem accounting focuses on asse...

  7. MDOT implementation plan for global positioning systems (GPS) technology in planning, design, and construction delivery.

    Science.gov (United States)

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  8. Performance characteristics of low global warming potential R134a alternative refrigerants in ejector-expansion refrigeration system

    Directory of Open Access Journals (Sweden)

    Mishra Shubham

    2016-12-01

    Full Text Available Performance assessment of ejector-expansion vapor compression refrigeration system with eco-friendly R134a alternative refrigerants (R152a, R1234yf, R600a, R600, R290, R161, R32, and propylene is presented for air-conditioning application. Ejector has been modeled by considering experimental data based correlations of component efficiencies to take care of all irreversibilities. Ejector area ratio has been optimized based on maximum coefficient of performance (COP for typical air-conditioner operating temperatures. Selected refrigerants have been compared based on area ratio, pressure lift ratio, entrainment ratio, COP, COP improvement and volumetric cooling capacity. Effects of normal boiling point and critical point on the performances have been studied as well. Using ejector as an expansion device, maximum improvement in COP is noted in R1234yf (10.1%, which reduces the COP deviation with R134a (4.5% less in basic cycle and 2.5% less in ejector cycle. Hence, R1234yf seems to be best alternative for ejector expansion system due to its mild flammability and comparable volumetric capacity and cooling COP. refrigerant R161 is superior to R134a in terms of both COP and volumetric cooling capacity, although may be restricted for low capacity application due to its flammability.

  9. Performance characteristics of low global warming potential R134a alternative refrigerants in ejector-expansion refrigeration system

    Science.gov (United States)

    Mishra, Shubham; Sarkar, Jahar

    2016-12-01

    Performance assessment of ejector-expansion vapor compression refrigeration system with eco-friendly R134a alternative refrigerants (R152a, R1234yf, R600a, R600, R290, R161, R32, and propylene) is presented for air-conditioning application. Ejector has been modeled by considering experimental data based correlations of component efficiencies to take care of all irreversibilities. Ejector area ratio has been optimized based on maximum coefficient of performance (COP) for typical air-conditioner operating temperatures. Selected refrigerants have been compared based on area ratio, pressure lift ratio, entrainment ratio, COP, COP improvement and volumetric cooling capacity. Effects of normal boiling point and critical point on the performances have been studied as well. Using ejector as an expansion device, maximum improvement in COP is noted in R1234yf (10.1%), which reduces the COP deviation with R134a (4.5% less in basic cycle and 2.5% less in ejector cycle). Hence, R1234yf seems to be best alternative for ejector expansion system due to its mild flammability and comparable volumetric capacity and cooling COP. refrigerant R161 is superior to R134a in terms of both COP and volumetric cooling capacity, although may be restricted for low capacity application due to its flammability.

  10. Volume definition system for treatment planning

    International Nuclear Information System (INIS)

    Alakuijala, Jyrki; Pekkarinen, Ari; Puurunen, Harri

    1997-01-01

    Purpose: Volume definition is a difficult and time consuming task in 3D treatment planning. We have studied a systems approach for constructing an efficient and reliable set of tools for volume definition. Our intent is to automate body outline, air cavities and bone volume definition and accelerate definition of other anatomical structures. An additional focus is on assisting in definition of CTV and PTV. The primary goals of this work are to cut down the time used in contouring and to improve the accuracy of volume definition. Methods: We used the following tool categories: manual, semi-automatic, automatic, structure management, target volume definition, and visualization tools. The manual tools include mouse contouring tools with contour editing possibilities and painting tools with a scaleable circular brush and an intelligent brush. The intelligent brush adapts its shape to CT value boundaries. The semi-automatic tools consist of edge point chaining, classical 3D region growing of single segment and competitive volume growing of multiple segments. We tuned the volume growing function to take into account both local and global region image values, local volume homogeneity, and distance. Heuristic seeding followed with competitive volume growing finds the body outline, couch and air automatically. The structure management tool stores ICD-O coded structures in a database. The codes have predefined volume growing parameters and thus are able to accommodate the volume growing dissimilarity function for different volume types. The target definition tools include elliptical 3D automargin for CTV to PTV transformation and target volume interpolation and extrapolation by distance transform. Both the CTV and the PTV can overlap with anatomical structures. Visualization tools show the volumes as contours or color wash overlaid on an image and displays voxel rendering or translucent triangle mesh rendering in 3D. Results: The competitive volume growing speeds up the

  11. Scenarios of Expansion to Electric Generation Capacity

    Directory of Open Access Journals (Sweden)

    José Somoza-Cabrera

    2017-06-01

    Full Text Available We show the building scenarios of expansion to electric generation capacity enough to supply the demand to 2050. We were using the LEAP facility (Long-range Energy Alternatives Planning System, to simulate dispatch of electricity at minimum cost. Finally, we show the cost-benefice analysis of the technologies availability, included externality and CO2 emission limited. However that we included the externals cost in this analysis, it results insufficient to closed gap between fossil and renewable technologies of electric generation. Nevertheless, in some opportunities the renewable options had very important participations in the minimal cost scenario of expansion.

  12. Planning Model for Peruvian University System

    OpenAIRE

    Chiyon, Isabel; Yague, Jose Luis

    2015-01-01

    This paper arises from observing the effect that the education policy has had on the European Higher Education Area that promotes the primary objective of this research: the preparation of a planning model that contributes, based on the European experience, the basic elements for the quality of higher education in Peru. To appraise the timeliness and usefulness of the aforementioned model, the scope of the Spanish model is selected and specifically adapted to the Peruvian model, which can be ...

  13. Electronic systems for the organization and planning of school

    OpenAIRE

    Vodová, Alena

    2014-01-01

    TITLE: Electronic systems for the organization and planning of school AUTHOR: Alena Vodová DEPARTMENT: The Center of School management SUPERVISOR: Ing. Petr Svoboda Ph.D. ABSTRACT: The bachelor thesis gives comprehensive overview electronic systems for organization and planning of school. Maps of species, describes their function, demonstrates the benefits, modes and applications to use in school. In the research part individuals system compares between them and validates their use in schools...

  14. Mission Planning System Increment 5 (MPS Inc 5)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Mission Planning System Increment 5 (MPS Inc 5) Defense Acquisition Management Information...President’s Budget RDT&E - Research, Development, Test, and Evaluation SAE - Service Acquisition Executive TBD - To Be Determined TY - Then Year...Phone: 845-9625 DSN Fax: Date Assigned: May 19, 2014 Program Information Program Name Mission Planning System Increment 5 (MPS Inc 5) DoD

  15. Technical papers presented at the 4. symposium of specialists in electric operational and expansion planning. v. 1; Artigos tecnicos apresentados no 4. simposio de especialistas em planejamento da operacao e expansao eletrica. v. 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    This document collects papers presented in the 4. Symposium of specialists in electric operation and expansion planning. The main problems affecting this sector in the world are discussed. Several cases studies are presented as well as state of the art and new developing technologies

  16. High frequency system project implementation plan

    International Nuclear Information System (INIS)

    Moon, L.L.

    1976-01-01

    The High Frequency System is a new mobile, digital diagnostic recording system for use at the Nevada Test Site. Many different kinds of event data will be digitized in real-time by this system, and these data will be recorded and stored for later read-out and transmission to NADCEN. The hardware and software requirements of the High Frequency System are examined, and the parameters of the system are proposed

  17. System Planning With The Hanford Waste Operations Simulator

    International Nuclear Information System (INIS)

    Crawford, T.W.; Certa, P.J.; Wells, M.N.

    2010-01-01

    At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

  18. Identification systems subject to plan cybersecurity; Identificacion de sistemas sujetos al plan de Ciberseguridad

    Energy Technology Data Exchange (ETDEWEB)

    Guerrero Sanz, J.; Perez Alcaniz, T.; Garcia Garcia, I.

    2012-07-01

    The implementation of a Plan Cybersecurity ensures that systems and communications networks that perform functions related to both physical security such emergency action and their support systems, and interfaces that may affect them, are protected with an effective system against cyber attacks.

  19. Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Phase II of the overall 3-phase KIPS program is described. This volume presents a program plan for qualifying the organic Rankine power system for flight test in 1982. The program plan calls for the design and fabrication of the proposed flight power system; conducting a development and a qualification program including both environmental and endurance testing, using an electrical and a radioisotope heat source; planning for flight test and spacecraft integration; and continuing ground demonstration system testing to act as a flight system breadboard and to accumulate life data

  20. Assessment of Energy Removal Impacts on Physical Systems: Hydrodynamic Model Domain Expansion and Refinement, and Online Dissemination of Model Results

    International Nuclear Information System (INIS)

    Yang, Zhaoqing; Khangaonkar, Tarang; Wang, Taiping

    2010-01-01

    In this report we describe the (1) the expansion of the PNNL hydrodynamic model domain to include the continental shelf along the coasts of Washington, Oregon, and Vancouver Island; and (2) the approach and progress in developing the online/Internet disseminations of model results and outreach efforts in support of the Puget Sound Operational Forecast System (PS-OPF). Submittal of this report completes the work on Task 2.1.2, Effects of Physical Systems, Subtask 2.1.2.1, Hydrodynamics, for fiscal year 2010 of the Environmental Effects of Marine and Hydrokinetic Energy project.

  1. Implementation of a Web-Based Collaborative Process Planning System

    Science.gov (United States)

    Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi

    Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.

  2. ATIPS: Automatic Travel Itinerary Planning System for Domestic Areas.

    Science.gov (United States)

    Chang, Hsien-Tsung; Chang, Yi-Ming; Tsai, Meng-Tze

    2016-01-01

    Leisure travel has become a topic of great interest to Taiwanese residents in recent years. Most residents expect to be able to relax on a vacation during the holidays; however, the complicated procedure of travel itinerary planning is often discouraging and leads them to abandon the idea of traveling. In this paper, we design an automatic travel itinerary planning system for the domestic area (ATIPS) using an algorithm to automatically plan a domestic travel itinerary based on user intentions that allows users to minimize the process of trip planning. Simply by entering the travel time, the departure point, and the destination location, the system can automatically generate a travel itinerary. According to the results of the experiments, 70% of users were satisfied with the result of our system, and 82% of users were satisfied with the automatic user preference learning mechanism of ATIPS. Our algorithm also provides a framework for substituting modules or weights and offers a new method for travel planning.

  3. Supporting strategic spatial planning : planning support systems for the spatial planning of metropolitan landscapes

    NARCIS (Netherlands)

    Carsjens, G.J.

    2009-01-01

    Een belangrijke opgave voor de ruimtelijke planning is en balans te vinden tussen de toegenomen druk op de open groene ruimte door verstedelijking en economische ontwikkeling enerzijds, en de noodzaak van het behouden van deze landelijke gebieden voor natuur, recreatie, landschap en voedselproductie

  4. SBNCT plan: A 3-dimensional treatment planning system for boron neutron capture therapy

    International Nuclear Information System (INIS)

    Reinstein, L.E.; Ramsay, E.B.; Gajewski, J.; Ramamoorthy, S.; Meek, A.G.

    1993-01-01

    The need for accurate and comprehensive 3-dimensional treatment planning for boron neutron capture therapy (BNCT) has been debated for the past several years. Although many argue against the need for elaborate and expensive treatment planning programs which mimic conventional radiotherapy planning systems, it is clear that in order to realize significant gains over conventional fractionated radiation therapy, patients must be treated to the edge of normal tissue tolerance. Just how close to this edge is dictated by the uncertainties in dosimetry. Hence the focus of BNCT planning is the determination of dose distribution throughout normal tissue volumes. Although precise geometric manipulation of the epithermal neutron beam is not achievable, the following variables play an important role in BNCT optimization: patient orientation, dose fractionation, number of fields, megawatt-minutes per fraction, use of surface bolus, and use of collimation. Other variables which are not as easily adjustable and would not, therefore, be part of treatment planning optimization, include external patient contour, internal patient heterogeneities, boron compound distributions, and RBE's. The boron neutron capture therapy planning system developed at SUNY Stony Brook (SBNCT-Plan) was designed as an interactive graphic tool to assist the radiation oncologist in generating the optimum plan for a neutron capture treatment

  5. Sequence Coding and Search System Backfit Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    Lovell, C.J.; Stepina, P.L.

    1985-03-01

    The Sequence Coding and Search System is a computer-based encoding system for events described in Licensee Event Reports. This data system contains LERs from 1981 to present. Backfit of the data system to include LERs prior to 1981 is required. This report documents the Quality Assurance Program Plan that EG and G Idaho, Inc. will follow while encoding 1980 LERs

  6. Planning and Optimization Methods for Active Distribution Systems

    DEFF Research Database (Denmark)

    Abbey, Chad; Baitch, Alex; Bak-Jensen, Birgitte

    distribution planning. Active distribution networks (ADNs) have systems in place to control a combination of distributed energy resources (DERs), defined as generators, loads and storage. With these systems in place, the AND becomes an Active Distribution System (ADS). Distribution system operators (DSOs) have...

  7. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  8. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    International Nuclear Information System (INIS)

    Fishler, B.

    2011-01-01

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  9. Master planning for successful safeguard/security systems engineering

    International Nuclear Information System (INIS)

    Bruckner, D.G.

    1987-01-01

    The development and phased implementation of an overall master plan for weapons systems and facilities engaged in the complexities of high technology provides a logical road map for system accomplishment. An essential factor in such a comprehensive plan is development of an integrated systems security engineering plan. Some DOD programs use new military regulations and policy directives to mandate consideration of the safeguard/security disciplines be considered for weapons systems and facilities during the entire life cycle of the program. The emphasis is to make certain the weapon system and applicable facilities have complementary security features. Together they must meet the needs of the operational mission and, at the same time, provide the security forces practical solutions to their requirements. This paper discusses the process of meshing the safe- guards/security requirements with an overall the master plan and the challenges attendant to this activity

  10. Surface moisture measurement system acceptance testing work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    This work plan addresses testing of the Surface Moisture Measurement System (SMMS) at the Fuels and Materials Examination Facility (FMEF). The purpose of this plan is to define the scope of work, identify organizational responsibilities, describe test control requirements, and provide estimated costs and schedule associated with acceptance testing

  11. Strategic environmental evaluation of National Transmission System Plan in Italy

    International Nuclear Information System (INIS)

    Lanadio, E.; Motawi, A.; Rizzuto, R.; Cappiello, A.; Micotti, M.

    2008-01-01

    The entry into force of part II of D. Lgs. 152/2006 establishing the procedures for strategic environmental assessment for plans and programs. The application of legislation to the development plan of the electric network of the National Transmission System verify testing conducted by Terna with ministries and authorities with environmental competences [it

  12. Research Perspectives for Material Requirements Planning Systems. Paper No. 434.

    Science.gov (United States)

    Berry, W. L.; Whybark, D. Clay

    Material requirements planning (MRP) systems are described as management tools for planning and controlling production operations. A wide variety of industries and production organizations are credited as reporting significant operating improvements in such areas as inventory control, production scheduling, delivery performance, and production…

  13. Impact of structural reforms on planning systems and policies

    DEFF Research Database (Denmark)

    Galland, Daniel; Enemark, Stig

    2013-01-01

    spatial development processes. The reasoning behind this argument stems from the case of Denmark, where a structural reform that changed the country’s geographies of inter-governmental arrangements significantly transformed the configuration and functioning of the national spatial planning system. Once...... concerning how the scope of Danish spatial planning has been reoriented over time in light of three interrelated strands of understanding....

  14. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  15. Benefits of advanced software techniques for mission planning systems

    Science.gov (United States)

    Gasquet, A.; Parrod, Y.; Desaintvincent, A.

    1994-10-01

    The increasing complexity of modern spacecraft, and the stringent requirement for maximizing their mission return, call for a new generation of Mission Planning Systems (MPS). In this paper, we discuss the requirements for the Space Mission Planning and the benefits which can be expected from Artificial Intelligence techniques through examples of applications developed by Matra Marconi Space.

  16. Application of action planning to PES systems

    OpenAIRE

    Paredes Cuervo, Diego; Arango Ramírez, Alejandro

    2008-01-01

    Buscando aportar una de las primeras aproximaciones metodológicas al tema del pago por servicios ambientales (PSA) en la cuenca del río Otún (Risaralda, Colombia) se propuso un plan de acción para la instalación de un sistema de PSA en la zona. El resultado principal de este proceso fue la definición de las actividades, responsabilidades y recursos para la implementación de un proyecto piloto de PSA enfocado en la calidad hídrica y la conservación de la biodiversidad y que incluirá como p...

  17. French experience concerning expansion compensating devices on the primary systems of nuclear reactors

    International Nuclear Information System (INIS)

    Vrillon, B.; Raynal, A.

    1980-01-01

    French experience in the use of large expansion bellows in the presence of hot sodium is extremely limited. This stems from the 'pool' structure of the primary circuit, adopted in France to eliminate the need to solve expansion problems affecting the primary piping of loop reactors. Furthermore, until the present time, the use of bellows on secondary circuits has neither been implemented nor considered. A few bellows nevertheless exist on the Phenix and Super-Phenix reactors, and these perform separation functions, for example, between sodium at different temperature and/or pressures, or tightness functions in gaseous environment at the component penetrations in the slabs. The dimension criteria applied to these bellows are the general rules for structural dimensioning. Since they do not form part of a circuit wall, they do not need to be discussed. Note, however, that these components have not raised any particular problems thus far. Expansion bellows exist in France on the primary circuits of certain nuclear reactors of the natural uranium/graphite/gas type. These reactors have been in operation for many years, and some lessons can be drawn from this experience in the use of bellows in representative conditions on power reactor circuits. Liquid sodium raises specific problems with respect to circuit operation and material behavior. However, many problems in the use of bellows are independent of the fluid conveyed in the circuits. This is why the experience gained with gas type power reactors appears to be useful in considering the possible future use of bellows on sodium reactor circuits

  18. A Web-based Tool for Transparent, Collaborative Urban Water System Planning for Monterrey, Mexico

    Science.gov (United States)

    Rheinheimer, D. E.; Medellin-Azuara, J.; Garza Díaz, L. E.; Ramírez, A. I.

    2017-12-01

    Recent rapid advances in web technologies and cloud computing show great promise for facilitating collaboration and transparency in water planning efforts. Water resources planning is increasingly in the context of a rapidly urbanizing world, particularly in developing countries. In such countries with democratic traditions, the degree of transparency and collaboration in water planning can mean the difference between success and failure of water planning efforts. This is exemplified in the city of Monterrey, Mexico, where an effort to build a new long-distance aqueduct to increase water supply to the city dramatically failed due to lack of transparency and top-down planning. To help address, we used a new, web-based water system modeling platform, called OpenAgua, to develop a prototype decision support system for water planning in Monterrey. OpenAgua is designed to promote transparency and collaboration, as well as provide strong, cloud-based, water system modeling capabilities. We developed and assessed five water management options intended to increase water supply yield and/or reliability, a dominant water management concern in Latin America generally: 1) a new long-distance source (the previously-rejected project), 2) a new nearby reservoir, 3) expansion/re-operation of an existing major canal, 4) desalination, and 5) industrial water reuse. Using the integrated modeling and analytic capabilities of OpenAgua, and some customization, we assessed the performance of these options for water supply yield and reliability to help identify the most promising ones. In presenting this assessment, we demonstrate the viability of using online, cloud-based modeling systems for improving transparency and collaboration in decision making, reducing the gap between citizens, policy makers and water managers, and future directions.

  19. Nuclear electric capacity expansion in Mexico: system effects of reactor size and cost

    International Nuclear Information System (INIS)

    Thayer, G.R.; Abbey, D.S.; Hardie, R.W.; Enriquez, R.P.; Uria, E.G.

    1984-01-01

    Mexico's electrical generation capacity could more than double over the next ten years - from about 15 GWe currently to as much as 35 GWe in 1990. While new capacity additions will be predominantly oil-fired in the 1980's, nuclear power will become increasingly important in the 1990's. This study investigated the appropriate size of new, nuclear capacity additions by assessing the implications of installing different size reactors into Mexico's electrical grid. Included in the assessments of reactor sizes are estimates of electrical generation costs and comparisons of the effective load-carrying capability of a 10 GWe nuclear capacity expansion

  20. Systems Engineering Assessment & Workforce Development Plan

    Science.gov (United States)

    2012-11-05

    Government or its technical domains. Other fields, such as culinary and healthcare, have also identified these emerging and growing issues (Calhoun...et al. (2009). "The Art and Science of Systems Engineering." Systems Research Forum 3(2): 81-100. Shenhar, A. and B. Sauser, Eds. (2009). Systems

  1. System expansion for handling co-products in LCA of sugar cane bio-energy systems: GHG consequences of using molasses for ethanol production

    International Nuclear Information System (INIS)

    Nguyen, Thu Lan T.; Hermansen, John E.

    2012-01-01

    Highlights: → A challenging issue in LCA is how to account for co-products' environmental burdens. → The two most commonly used procedures are system expansion and allocation. → System expansion appears to be more appropriate than allocation. → Indirect land use change is a consequence of diverting molasses from feed to fuel. → The inclusion of land use change worsens the GHG balance of molasses ethanol. -- Abstract: This study aims to establish a procedure for handling co-products in life cycle assessment (LCA) of a typical sugar cane system. The procedure is essential for environmental assessment of ethanol from molasses, a co-product of sugar which has long been used mainly for feed. We compare system expansion and two allocation procedures for estimating greenhouse gas (GHG) emissions of molasses ethanol. As seen from our results, system expansion yields the highest estimate among the three. However, no matter which procedure is used, a significant reduction of emissions from the fuel stage in the abatement scenario, which assumes implementation of substituting bioenergy for fossil-based energy to reduce GHG emissions, combined with a negligible level of emissions from the use stage, keeps the estimate of ethanol life cycle GHG emissions below that of gasoline. Pointing out that indirect land use change (ILUC) is a consequence of diverting molasses from feed to fuel, system expansion is the most adequate method when the purpose of the LCA is to support decision makers in weighing the options and consequences. As shown in the sensitivity analysis, an addition of carbon emissions from ILUC worsens the GHG balance of ethanol, with deforestation being a worst-case scenario where the fuel is no longer a net carbon saver but carbon emitter.

  2. Theory of photoemission and inverse-photoemission spectra of highly correlated electron systems: A weak-coupling 1/N expansion

    International Nuclear Information System (INIS)

    Riseborough, P.S.

    1989-01-01

    An N-fold-degenerate Hubbard model is examined in the weak-coupling regime. The one-electron Green's function is calculated from a systematic expansion of the irreducible self-energy in powers of 1/N. To lowest order in the expansion, one obtains a trivial mean-field theory. In the next leading order in 1/N, one finds that the dynamics are dominated by bosonlike collective excitations. The resulting expansion has the characteristics of the standard weak-coupling field theory, except the inclusion of the 1/N factors extends the regime of applicability to include Stoner-like enhancement factors which can be N times larger. The joint valence-band photoemission and inverse-photoemission spectrum is given by the trace of the imaginary part of the one-electron Green's function. The electronic spectrum has been calculated by truncating the series expansion for the self-energy in the lowest nontrivial order of 1/N. For small values of the Coulomb interaction between the electrons, the spectrum reduces to the form obtained by calculating the self-energy to second order in the Coulomb interaction. The spectra shows a narrowing of the band in the vicinity of the Fermi level and long high-energy band tails. When the boson spectrum softens, indicating the vicinity of a phase transition, the electronic spectrum shows the appearance of satellites. The results are compared with experimental observations of anomalies in the electronic spectra of uranium-based systems. The relation between the electronic spectrum and the thermodynamic mass enhancements is also discussed

  3. Pipelines, utilities plan over 150 scada systems

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that North American pipelines and utilities will spend more than $170 million on new or upgraded supervisory control and data acquisition (scada) systems during the 30-month period that commenced Sept. 1. Another $12.5 million will be spent on peripherals and consulting. Among the 699 various projects to be implemented during the period, companies will install 151 scada systems, add 154 remote-terminal units (RTUs) to existing scada units, and install 196 communications systems. Scada systems are computerized hardware and software systems that perform a set of monitoring and control functions. In gas utilities, these systems perform functions normally associated with gas transmission and distribution as well as production plant process control. In gas and oil pipelines, the systems perform these functions as well as such specialized functions as batch tracking, leak detection, and gas load flow

  4. Using TELOS for the planning of the information system audit

    Science.gov (United States)

    Drljaca, D. P.; Latinovic, B.

    2018-01-01

    This paper intent is to analyse different aspects of information system audit and to synthesise them into the feasibility study report in order to facilitate decision making and planning of information system audit process. The TELOS methodology provides a comprehensive and holistic review for making feasibility study in general. This paper examines the use of TELOS in the identification of possible factors that may influence the decision on implementing information system audit. The research question relates to TELOS provision of sufficient information to decision makers to plan an information system audit. It was found that the TELOS methodology can be successfully applied in the process of approving and planning of information system audit. The five aspects of the feasibility study, if performed objectively, can provide sufficient information to decision makers to commission an information system audit, and also contribute better planning of the audit. Using TELOS methodology can assure evidence-based and cost-effective decision-making process and facilitate planning of the audit. The paper proposes an original approach, not examined until now. It is usual to use TELOS for different purposes and when there is a need for conveying of the feasibility study, but not in the planning of the information system audit. This gives originality to the paper and opens further research questions about evaluation of the feasibility study and possible research on comparative and complementary methodologies.

  5. An image-guided planning system for endosseous oral implants.

    Science.gov (United States)

    Verstreken, K; Van Cleynenbreugel, J; Martens, K; Marchal, G; van Steenberghe, D; Suetens, P

    1998-10-01

    A preoperative planning system for oral implant surgery was developed which takes as input computed tomographies (CT's) of the jaws. Two-dimensional (2-D) reslices of these axial CT slices orthogonal to a curve following the jaw arch are computed and shown together with three-dimensional (3-D) surface rendered models of the bone and computer-aided design (CAD)-like implant models. A technique is developed for scanning and visualizing an eventual existing removable prosthesis together with the bone structures. Evaluation of the planning done with the system shows a difference between 2-D and 3-D planning methods. Validation studies measure the benefits of the 3-D approach by comparing plans made in 2-D mode only with those further adjusted using the full 3-D visualization capabilities of the system. The benefits of a 3-D approach are then evident where a prosthesis is involved in the planning. For the majority of the patients, clinically important adjustments and optimizations to the 2-D plans are made once the 3-D visualization is enabled, effectively resulting in a better plan. The alterations are related to bone quality and quantity (p biomechanics (p < 0.005), and esthetics (p < 0.005), and are so obvious that the 3-D plan stands out clearly (p < 0.005). The improvements often avoid complications such as mandibular nerve damage, sinus perforations, fenestrations, or dehiscences.

  6. Planning Support Systems (PSS-Based Spatial Plan Alternatives and Environmental Assessment

    Directory of Open Access Journals (Sweden)

    Hee-Sun Choi

    2016-03-01

    Full Text Available Spatial planning is at the core of national land and urban development. Many countries and cities seek sustainable development through various means such as coordinated environmental planning, environmental assessment, and internalization of environmental analysis and planning. A Planning Support System (PSS is a GIS (Geographic Information System-based, spatial decision-making support system that incorporates a variety of theories and pertinent models. This study adopted the “What if?” model to design an alternative spatial plan that includes generation of predictive scenarios and is relatively easy to use. In the cities studied, we identified a total of six scenarios based on the main drivers of development—namely, population and spatial policies. Subsequently, we assessed the alternatives for their environmental impact, preparing sensitivity maps for each major environmental issue in the target area (natural ecosystem, air and microclimate, natural disasters. One projected advantage of the “What if?” model is that its digital visualization of proposed plans may improve public awareness and involvement. Furthermore, the tool is expected to be highly useful in ensuring the objectivity of quantitative analyses. However, it is necessary to develop a PSS that is both standardized and tailored to the particular needs of each area. Finally, the development of an e-governance system will be beneficial in ensuring public access to the decision making process.

  7. The public transportation system security and emergency preparedness planning guide

    Science.gov (United States)

    2003-01-01

    Recent events have focused renewed attention on the vulnerability of the nation's critical infrastructure to major events, including terrorism. The Public Transportation System Security and Emergency Preparedness Planning Guide has been prepared to s...

  8. 300 Area waste acid treatment system closure plan. Revision 1

    International Nuclear Information System (INIS)

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan

  9. Joint C4ISR Architecture Planning/Analysis System (JCAPS)

    National Research Council Canada - National Science Library

    Wostbrock, Bill

    2002-01-01

    The contractor satisfactorily completed all tasks under both efforts, providing the technology and technical expertise in the development of the Joint C4ISR Architecture Planning/Analysis System (JCAPS) Database Tool...

  10. Equipment acquisition plans for the SSCL magnet excitation power system

    International Nuclear Information System (INIS)

    Winje, R.

    1993-05-01

    This report gives a brief description of the major electrical technical equipment used in the Superconducting Super Collider accelerators systems and the present laboratory plans for the acquisition of the equipment

  11. Remedial Action Plan for Expanded Bioventing System Facility 6454

    National Research Council Canada - National Science Library

    1996-01-01

    This draft remedial action plan (RAP) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at Site 6454 at Vandenberg Air Force Base (AFB), California...

  12. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  13. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  14. 300 Area waste acid treatment system closure plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.

  15. Implementation Issues for Departure Planning Systems

    Science.gov (United States)

    Hansman, R. John; Feron, Eric; Clarke, John-Paul; Odoni, Amedeo

    1999-01-01

    The objective of the proposed effort is to investigate issues associated with the design and implementation of decision aiding tools to assist in improving the departure process at congested airports. This effort follows a preliminary investigation of potential Departure Planning approaches and strategies, which identified potential benefits in departure efficiency, and also in reducing the environmental impact of aircraft in the departure queue. The preliminary study bas based, in large part, on observations and analysis of departure processes at Boston, Logan airport. The objective of this follow-on effort is to address key implementation issues and to expand the observational base to include airports with different constraints and traffic demand. Specifically, the objectives of this research are to: (1) Expand the observational base to include airports with different underlying operational dynamics. (2) Develop prototype decision aiding algorithms/approaches and assess potential benefits. and (3) Investigate Human Machine Integration (HMI) issues associated with decision aids in tower environments.

  16. Systems engineering implementation plan for the liquid effluents services program

    International Nuclear Information System (INIS)

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described

  17. Implementation of three dimensional treatment planning system for external radiotherapy

    International Nuclear Information System (INIS)

    Major, Tibor; Kurup, P.G.G.; Stumpf, Janos

    1997-01-01

    A three dimensional (3D) treatment planning system was installed at Apollo Cancer Hospital, Chennai, India in 1995. This paper gives a short description of the system including hardware components, calculation algorithm, measured data requirements and specific three dimensional features. The concept and the structure of the system are shortly described. The first impressions along with critical opinions and the experiences are gained during the data acquisition are mentioned. Some improvements in the user interface are suggested. It is emphasized that although a 3D system offers more detailed and accurate dose distributions compared to a 2D system, it also introduces a greatly increased workload for the planning staff. (author)

  18. ROUTE PLAN DESIGNER FOR TRACTOR GUIDANCE SYSTEMS

    DEFF Research Database (Denmark)

    Sveistrup, Daniel; Jørgensen, Rasmus Nyholm; Green, Ole

    2010-01-01

    Earlier works have shown field trial designs to be very labor extensive, even when combining autoguidancesystems with conventional machinery.Designing routes for semi-automated systems in a controlled manner is both resource demandingand complicated. Different types of auto-guidance systems vary ...

  19. Tank Farm Contractor Waste Remediation System and Utilization Plan

    International Nuclear Information System (INIS)

    KIRKBRIDE, R.A.

    1999-01-01

    The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy

  20. TECHNIQUE OF OPTIMAL AUDIT PLANNING FOR INFORMATION SECURITY MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    F. N. Shago

    2014-03-01

    Full Text Available Complication of information security management systems leads to the necessity of improving the scientific and methodological apparatus for these systems auditing. Planning is an important and determining part of information security management systems auditing. Efficiency of audit will be defined by the relation of the reached quality indicators to the spent resources. Thus, there is an important and urgent task of developing methods and techniques for optimization of the audit planning, making it possible to increase its effectiveness. The proposed technique gives the possibility to implement optimal distribution for planning time and material resources on audit stages on the basis of dynamics model for the ISMS quality. Special feature of the proposed approach is the usage of a priori data as well as a posteriori data for the initial audit planning, and also the plan adjustment after each audit event. This gives the possibility to optimize the usage of audit resources in accordance with the selected criteria. Application examples of the technique are given while planning audit information security management system of the organization. The result of computational experiment based on the proposed technique showed that the time (cost audit costs can be reduced by 10-15% and, consequently, quality assessments obtained through audit resources allocation can be improved with respect to well-known methods of audit planning.