WorldWideScience

Sample records for system east tennessee

  1. System Description for the K-25/K-27 D and D Project Polyurethane Foam Delivery System, East Tennessee Technology Park, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Boris, G.

    2008-01-01

    The Foam Delivery System used in the decontamination and decommissioning (D and D) project for the K-25/K-27 Buildings at the East Tennessee Technology Park (ETTP) is comprised of a trailer-mounted Gusmer(reg s ign) H20/35 Pro-TEC Proportioning Unit and the associated equipment to convey electrical power, air, and foam component material to the unit. This high-pressure, plural-component polyurethane foam pouring system will be used to fill process gas and non-process equipment/piping (PGE/P) within the K-25/K-27 Buildings with polyurethane foam to immobilize contaminants prior to removal. The system creates foam by mixing isocyanate and polyol resin (Resin) component materials. Currently, the project plans to utilize up to six foaming units simultaneously during peak foaming activities. Also included in this system description are the foam component material storage containers that will be used for storage of the component material drums in a staging area outside of the K-25/K-27 Buildings. The Foam Delivery System and foam component material storage enclosures (i.e., Foaming Component Protective Enclosures) used to store polymeric methylene diphenyl diisocyanate (PMDI) component material are identified as Safety Significant (SS) Structures, Systems and Components (SSC) in the Documented Safety Analysis (DSA) for the project, Documented Safety Analysis for the K-25 and K-27 Facilities at the East Tennessee Technology Park, Oak Ridge, Tennessee, DSA-ET-K-25/K-27-0001

  2. Independent Verification Survey Report For Zone 1 Of The East Tennessee Technology Park In Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    King, David A.

    2012-01-01

    Oak Ridge Associated Universities (ORAU) conducted in-process inspections and independent verification (IV) surveys in support of DOE's remedial efforts in Zone 1 of East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Inspections concluded that the remediation contractor's soil removal and survey objectives were satisfied and the dynamic verification strategy (DVS) was implemented as designed. Independent verification (IV) activities included gamma walkover surveys and soil sample collection/analysis over multiple exposure units (EUs)

  3. Inventory of karst subsidence in the Valley and Ridge Province of East Tennessee

    International Nuclear Information System (INIS)

    Ketelle, R.H.; Newton, J.G.

    1986-01-01

    The first regional inventory of karst activity in the Valley and Ridge Province of East Tennessee was performed as a part of ongoing studies at Oak Ridge National Laboratory pertaining to environmental impact assessment of waste disposal in karst settings. More than half the land area in the Valley and Ridge Province of East Tennessee is underlain by karst-prone carbonate bedrock. The regional karst inventory was initiated to obtain current information on the extent of active karst subsidence in the region for use in decision making by the Department of Energy in planning future waste disposal facilities at Oak Ridge, Tennessee. The inventory was performed by contacting personnel of federal, state, and county agencies to obtain reports of known active karst subsidence within the region. Data from these interviews were tabulated resulting in identificaton of more than 250 karst subsidence incidents in East Tennessee, most of which have occurred since 1980. Although the infomation obtained was largely anecdotal, approximate location, date, size, and circumstances under which the collapses occurred were recorded for as many cases as could be documented. The study also included detailed reconnaissance of selected areas similar in geology and hydrology to a study area at Oak Ridge, Tennessee to identify causative factors which contribute to karst subsidence in the region and for comparison of the occurrence of visible karst features at different sites. Human activities affecting site hydrology such as large scale land clearing and earthmoving projects were related to most of the subsidence incidents inventoried

  4. Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Rigsby V.P.

    2009-02-12

    slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak

  5. 2003 East Tennessee Technology Park Annual Illness and Injury Surveillance Report

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs

    2007-05-23

    Annual Illness and Injury Surveillance Program report for 2003 for the East Tennessee Technology Park (K-25).The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  6. The February 21, 1993 tornadoes of East Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Fricke, K.E.; Kornegay, F.C. [Martin Marietta Energy Systems, Inc., Oak Ridge, TN (United States)

    1993-08-11

    A series of tornadoes struck the east Tennessee area on Sunday afternoon, February 21, 1993 around Knoxville, Lenoir City, and Oak Ridge causing millions of dollars worth of damage to both homes and businesses in the area, killing one, injuring a number of persons, and leaving a large area without power for many hours or even days due to damage to the local TVA transmission line network. One tornado touched down in the Department of Energy Oak Ridge Reservation near the Oak Ridge Y-12 Plant, continued through the Union Valley business district located just east of the plant, through the adjacent University of Tennessee Arboretum and then continued into the communities of Claxton and Powell. The path length of the tornado was approximately 13 miles. Damage to the Y-12 Plant was minimal, but the Union Valley business district was seriously damaged, including the Fusion Energy Design Center (FEDC) which houses a number of DOE related projects. The preliminary cost estimate of the damage to DOE facilities (both at Y-12 and at the FEDC) was around $520,000. This paper describes the local meteorological data, the tornado that struck near the Y-12 plant, the resulting damage both to the DOE facilities and to the surrounding communities, the plant emergency response and recovery activities, and the current hazard analyses being undertaken at the plant.

  7. The February 21, 1993 tornadoes of East Tennessee

    International Nuclear Information System (INIS)

    Fricke, K.E.; Kornegay, F.C.

    1993-01-01

    A series of tornadoes struck the east Tennessee area on Sunday afternoon, February 21, 1993 around Knoxville, Lenoir City, and Oak Ridge causing millions of dollars worth of damage to both homes and businesses in the area, killing one, injuring a number of persons, and leaving a large area without power for many hours or even days due to damage to the local TVA transmission line network. One tornado touched down in the Department of Energy Oak Ridge Reservation near the Oak Ridge Y-12 Plant, continued through the Union Valley business district located just east of the plant, through the adjacent University of Tennessee Arboretum and then continued into the communities of Claxton and Powell. The path length of the tornado was approximately 13 miles. Damage to the Y-12 Plant was minimal, but the Union Valley business district was seriously damaged, including the Fusion Energy Design Center (FEDC) which houses a number of DOE related projects. The preliminary cost estimate of the damage to DOE facilities (both at Y-12 and at the FEDC) was around $520,000. This paper describes the local meteorological data, the tornado that struck near the Y-12 plant, the resulting damage both to the DOE facilities and to the surrounding communities, the plant emergency response and recovery activities, and the current hazard analyses being undertaken at the plant

  8. East Tennessee State University's "Make a Difference" Project: Using a Team-Based Consultative Model To Conduct Functional Behavioral Assessments.

    Science.gov (United States)

    Vaughn, Kelley; Hales, Cindy; Bush, Marta; Fox, James

    1998-01-01

    Describes implementation of functional behavioral assessment (FBA) through collaboration between a university (East Tennessee State University) and the local school system. Discusses related issues such as factors in team training, team size, FBA adaptations, and replicability of the FBA team model. (Author/DB)

  9. Baseline Environmental Analysis Report for the K-1251 Barge Facility at the East Tennessee Technology Park, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Van Winkle J.E.

    2007-08-24

    This report documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) K-1251 Barge Facility, which is located at the East Tennessee Technology Park (ETTP). DOE is proposing to lease the facility to the Community Reuse Organization of East Tennessee (CROET). This report provides supporting information for the use, by a potential lessee, of government-owned facilities at ETTP. This report is based upon the requirements of Sect. 120(h) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The lease footprint is slightly over 1 acre. The majority of the lease footprint is defined by a perimeter fence that surrounds a gravel-covered area with a small concrete pad within it. Also included is a gravel drive with locked gates at each end that extends on the east side to South First Avenue, providing access to the facility. The facility is located along the Clinch River and an inlet of the river that forms its southern boundary. To the east, west, and north, the lease footprint is surrounded by DOE property. Preparation of this report included the review of government records, title documents, historic aerial photos, visual and physical inspections of the property and adjacent properties, and interviews with current and former employees involved in the operations on the real property to identify any areas on the property where hazardous substances and petroleum products or their derivatives and acutely hazardous wastes were known to have been released or disposed. Radiological surveys were conducted and chemical samples were collected to assess the facility's condition.

  10. An indoor air quality study of 40 East Tennessee homes

    International Nuclear Information System (INIS)

    Hawthorne, A.R.; Gammage, R.B.; Dudney, C.S.

    1986-01-01

    Over a 1-yr period, measurements of indoor air pollutants (COsub(x), NOsub(x), formaldehyde, volatile organics, particulate matter, and radon) were made in 40 homes in east Tennessee. The houses were of various ages with different types of insulation and heating. In 30% of the houses, the radon concentration exceeded 4 pCi/L. The mean radon level in houses built near ridgelines was 4.4 pCi/L, while houses located in the valleys had a mean level of 1.7 pCi/L. The factor having the most impact on infiltration was operation of the central duct fan of the heating, ventilation, and air conditioning system. For measurements made before December 1984, the mean rate of air exchange increased from 0.39 to 0.74 h -1 when the duct fan was operated. (author)

  11. Developing a Climate-Induced Social Vulnerability Index for Urban Areas: A Case Study of East Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Omitaomu, Olufemi A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Carvalhaes, Thomaz M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-09-01

    Census American Community Survey 2008-2012 data are used to construct a spatially explicit Climate-Induced Social Vulnerability Index (CSVI) for the East Tennessee area. This CSVI is a combination of a Social Vulnerability Index (SVI) and a Climate Index. A method is replicated and adapted to derive a custom SVI by Census tract for the counties participating in the East Tennessee Index, and a Climate Index is developed for the same area based on indicators for climate hazards. The resulting datasets are exported as a raster to be integrated and combined within the Urban Climate Adaptation Tool (Urban-CAT) to act as an indicator for communities which may be differentially vulnerable to changes in climate. Results for the SVI are mapped separately from the complete CSVI in this document as results for the latter are in development.

  12. Fiscal Year 2008 Phased Construction Completion Report for EU Z2-33 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Jacobs

    2008-09-11

    The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2161&D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2224&D3) (Zone 2 RDR/RAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone 1 exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program and remedial actions (RAs) were completed for EU Z2-33. Remedial action was also performed at two additional areas in adjacent EU Z2-42 because of their close proximity and similar nature to a small surface soil RA in EU Z2-33. Remedial actions for building slabs performed in EU Z2-33 during fiscal year (FY) 2007 were reported in the Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2723&D1). Recommended RAs for EU Z2-42 were described in the Fiscal Year 2006 Phased Construction

  13. Development of hardwood seed zones for Tennessee using a geographic information system

    Science.gov (United States)

    Post, L.S.; Schlarbaum, S.E.; Van Manen, F.; Cecich, R.A.; Saxton, A.M.; Schneider, J.F.

    2003-01-01

    For species that have no or limited information on genetic variation and adaptability to nonnative sites, there is a need for seed collection guidelines based on biological, climatological, and/or geographical criteria. Twenty-eight hardwood species are currently grown for reforestation purposes at the East Tennessee State Nursery. The majority of these species have had no genetic testing to define guidelines for seed collection location and can be distributed to sites that have a very different environment than that of seed origin(s). Poor survival and/or growth may result if seedlings are not adapted to environmental conditions at the planting location. To address this problem, 30 yr of Tennessee county precipitation and minimum temperature data were analyzed and grouped using a centroid hierarchical cluster analysis. The weather data and elevational data were entered into a Geographic Information System (GIS) and separately layered over Bailey's Ecoregions to develop a seed zone system for Tennessee. The seed zones can be used as a practical guideline for collecting seeds to ensure that the resulting seedlings will be adapted to planting environments.

  14. Indoor air quality study of forty east Tennessee homes

    International Nuclear Information System (INIS)

    Hawthorne, A.R.; Gammage, R.B.; Dudney, C.S.

    1984-12-01

    Over a one-year period, measurements of indoor air pollutants (CO/sub x/, NO/sub x/, formaldehyde, volatile organics, particulates, and radon) were made in 40 homes in East Tennessee. The houses were of various ages with different types of insulation and heating. Over one-half of the houses exceeded the ASHRAE indoor ceiling guideline of 0.1 ppM for formaldehyde on at least one occasion. Over the duration of the study, older houses averaged 0.04 ppM of formaldehyde while houses less than 5 years old averaged 0.08 ppM (P -1 when the duct fan was operated (measurements prior to December 1982). This report presents the study design and implementation, describes the monitoring protocols, and provides a complete set of the data collected during the project. 25 references, 29 figures, 42 tables

  15. Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    RSI

    2008-03-01

    The purpose of this Phased Construction Completion Report (PCCR) is to present the fiscal year (FY) 2007 results of characterization activities and recommended remedial actions (RAs) for 11 exposure units (EUs) in Zone 2 (Z2-01, Z2-03, Z2-08, Z2-23, Z2-24, Z2-28, Z2-34, Z2-37, Z2-41, Z2-43, and Z2-44) at the East Tennessee Technology Park (ETTP), which is located in the northwest corner of the U.S. Department of Energy (DOE) Oak Ridge Reservation in Oak Ridge, Tennessee (Fig. 1). ETTP encompasses a total land area of approximately 5000 acres that has been subdivided into three zones--Zone 1 ({approx}1400 acres), Zone 2 ({approx}800 acres), and the Boundary Area ({approx}2800 acres). Zone 2, which encompasses the highly industrialized portion of ETTP shown in Fig. 1, consists of all formerly secured areas of the facility, including the large processing buildings and direct support facilities; experimental laboratories and chemical and materials handling facilities; materials storage and waste disposal facilities; secure document records libraries; and shipping and receiving warehouses. The Zone 2 Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005) (Zone 2 ROD) specifies the future end use for Zone 2 acreage as uncontrolled industrial for the upper 10 ft of soils. Characterization activities in these areas were conducted in compliance with the Zone 2 ROD and the Dynamic Verification Strategy (DVS) and data quality objectives (DQOs) presented in the Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2007) (Zone 2 RDR/RAWP). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for the accessible EUs in FY 2007; (2) Describe and document the risk evaluation for each EU, and determine if the EU met the Zone 2 ROD requirements

  16. Best management practices plan for the Lower East Fork Poplar Creek remedial action project, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-08-01

    The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee: the Oak Ridge Y-12 Plant, the K-25 Site, and the Oak Ridge National Laboratory (ORNL) managed by Lockheed Martin Environmental Research Corporation. All facilities are managed by Lockheed Martin Energy Systems, Incorporated (Energy Systems) for the DOE. The Y-12 Plant is adjacent to the city of Oak Ridge and is also upstream from Oak Ridge along East Fork Poplar Creek. The portion of the creek downstream from the Y-12 Plant is Lower East Fork Poplar Creek (LEFPC). This project will remove mercury-contaminated soils from the LEFPC floodplain, transport the soils to Industrial Landfill V (ILF-V), and restore any affected areas. This project contains areas that were designated in 1989 as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site. The site includes DOE property and portions of commercial, residential, agricultural, and miscellaneous areas within the city of Oak Ridge

  17. Analysis of indoor air quality data from East Tennessee field studies

    International Nuclear Information System (INIS)

    Dudney, C.S.; Hawthorne, A.R.

    1985-08-01

    This report presents the results of follow-up experimental activities and data analyses of an indoor air quality study conducted in 40 East Tennessee homes during 1982-1983. Included are: (1) additional experimental data on radon levels in all homes, repeat measurements in house No. 7 with elevated formaldehyde levels, and energy audit information on the participants' homes; (2) further data analyses, especially of the large formaldehyde data base, to ascertain relationships of pollutant levels vs environmental factors and house characteristics; (3) indoor air quality data base considerations and development of the study data base for distribution on magnetic media for both mainframe and desktop computer use; and (4) identification of design and data collection considerations for future field studies. A bibliography of additional publications related to this effort is also presented

  18. Independent verification survey report for exposure units Z2-24, Z2-31, Z2-32, AND Z2-36 in zone 2 of the East Tennessee technology park Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    King, David A. [Oak Ridge Inst. for Science and Education (ORISE), Oak Ridge, TN (United States)

    2013-10-01

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management selected Oak Ridge Associated Universities (ORAU), through the Oak Ridge Institute for Science and Education (ORISE) contract, to perform independent verification (IV) at Zone 2 of the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. ORAU has concluded IV surveys, per the project-specific plan (PSP) (ORAU 2013a) covering exposure units (EUs) Z2-24, -31, -32, and -36. The objective of this effort was to verify the target EUs comply with requirements in the Zone 2 Record of Decision (ROD) (DOE 2005), as implemented by using the dynamic verification strategy presented in the dynamic work plan (DWP) (BJC 2007); and confirm commitments in the DWP were adequately implemented, as verified via IV surveys and soil sampling.

  19. Calendar year 1994 groundwater quality report for the Upper East Fork Poplar Creek Hydrogeologic Regime, Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-10-01

    This groundwater quality report (GWQR) contains an evaluation of the groundwater quality data obtained during the 1994 calendar year (CY) at several waste-management facilities and a petroleum fuel underground storage tank (UST) site at the US Department of Energy (DOE) Y-12 Plant located on the DOE Oak Ridge Reservation (ORR) southeast of Oak Ridge, Tennessee. These sites lie within the boundaries of the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), which is one of three hydrogeologic regimes defined for the purposes of groundwater quality monitoring at the Y-12 Plant. The Environmental Management Department of the Y-12 Plant Health, Safety, Environment, and Accountability (HSEA) Organization manages the groundwater monitoring activities in each regime under the auspices of the Y-12 Plant Groundwater Protection Program (GWPP). The purpose of the GWPP is to characterize the hydrogeology and to monitor groundwater quality at the Y-12 Plant and surrounding area to ensure protection of local groundwater resources in accordance with federal, state, and local regulations, DOE Orders, and Lockheed Martin Energy Systems, Inc. (Energy Systems) corporate policy

  20. Evaluation of Calendar Year 1996 groundwater and surface water quality data for the Upper East Fork Poplar Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-09-01

    This report presents an evaluation of the groundwater monitoring data obtained in the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) during calendar year (CY) 1996. The East Fork Regime encompasses several confirmed and suspected sources of groundwater contamination within industrialized areas of the US Department of Energy (DOE) Y-12 Plant in Bear Creek Valley (BCV) southeast of Oak Ridge, Tennessee. The CY 1996 groundwater and surface water monitoring data are presented in Calendar Year 1996 Annual Groundwater Monitoring Report for the Upper East Fork Poplar Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee, along with the required data evaluations specified in the Resource Conservation and Recovery Act (RCRA) post-closure permit for the East Fork Regime. This report provides additional evaluation of the CY 1996 groundwater and surface water monitoring data with an emphasis on regime-wide groundwater contamination and long-term concentration trends for regulated and non-regulated monitoring parameters

  1. Calendar Year 1997 Annual Groundwater Monitoring Report For The Upper East Fork Poplar Creek Hydrogeologic Regime At The U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Jones, S.B.

    1998-02-01

    This report contains the groundwater monitoring data obtained during calendar year (CY) 1997 in compliance with the Resource Conservation Wd Recovery Act (RCRA) post-closure permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) at the U.S. Department of Energy (DOE) Y-12 Plant in Oak Ridge, Tennessee. Issued by the Tennessee Department of Environment and Conservation (TDEC), the PCP defines the RCRA post-closure corrective action monitoring requirements for the portion of the groundwater contaminant plume that has migrated into the East Fork Regime ftom the S-3 Ponds, a closed RCW-regulated former surface impoundment located in Bear Creek Valley near the west end of the Y-12 Plant. In addition to the RCIL4 post-closure corrective action monitoring results, this report contains the groundwater and surface water monitoring data obtained during CY 1997 to fulfill requirements of DOE Order 5400.1.

  2. Calendar year 1995 groundwater quality report for the Upper East Fork Poplar Creek Hydrogeologic Regime Y-12 Plant, Oak Ridge Tennessee. 1995 Groundwater quality data interpretations and proposed program modifications

    International Nuclear Information System (INIS)

    1996-08-01

    This groundwater quality report (GWQR) contains an evaluation of the groundwater quality data obtained during the 1995 calendar year (CY) at several waste management facilities associated with the US Department of Energy (DOE) Y-12 Plant located on the DOE Oak Ridge Reservation (ORR) southeast of Oak Ridge, Tennessee. These sites lie within the boundaries of the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), which is one of three hydrogeologic regimes defined for the purposes of groundwater quality monitoring at the Y-12 Plant. The Environmental Management Department of the Y-12 Plant Health, Safety, Environment, and Accountability (HSEA) Organization manages the groundwater monitoring activities in each regime under the auspices of the Y-12 Plant Groundwater Protection Program (GWPP). The purpose of the GWPP is to characterize the hydrogeology and to monitor groundwater quality at the Y-12 Plant and surrounding area to ensure protection of local groundwater resources in accordance with federal, state, and local regulations, DOE Orders, and Lockheed Martin Energy Systems, Inc. (Energy Systems) corporate policy. The annual GWQR for the East Fork Regime is completed in two parts. Part I consists primarily of data appendices and serves as a reference for the groundwater quality data obtained each CY under the lead of the Y-12 Plant GWPP. Because it contains information needed to comply with reporting requirements of Resource Conservation and Recovery Act (RCRA) interim status assessment monitoring, the Part I GWQR is submitted to the Tennessee Department of Environment and Conservation (TDEC) by the RCRA reporting deadline (March 1 of the following CY); Energy Systems submitted the 1995 Part I GWQR for the East Fork Regime to the TDEC in February 1996. Part 2 (this report) contains an evaluation of the data with respect to regime-wide groundwater quality

  3. Evolution of mineralizing brines in the east Tennessee Mississippi Valley-type ore field

    Energy Technology Data Exchange (ETDEWEB)

    Kesler, S.E.; Gesink, J.A.; Haynes, F.M. (Univ. of Michingan, Ann Arbor (USA))

    1989-05-01

    The east Tennessee Mississippi Valley-type (MVT) ore field contains barite-fluorite and sphalterite deposits in a continuous paleoaquifer consisting of breccia zones in the Upper Cambrian-Lower Ordovician Knox Group. Paragenetic observations and fluid inclusion compositions in these deposits indicate that the Knox paleoaquifer was invaded first by Ca-rich brines (Ca:Na about 1) that deposited fluorite and barite, and later by Na-Ca brines (Ca:Na = 0.1 to 0.5) that deposited sphalerite. Geologic relation sindicate that these brines were derived from the southeast, in the area of the Middle Ordovician Servier foreland shale basin, and that imposed by fluorite solubility indicate further that all original connate water in the Sevier basin was required to deposit the estimated flourite reserves of the ore field.Thus, the later, sphalerite-depositing brines represent recycled meteoric water from the Sevier basin or connate brines from underlying (Cambrian) shales.

  4. The Second Tennessee Cavalry in the American Civil War

    Science.gov (United States)

    2014-06-13

    Hereafter cited as OR. 6Andrew Williams, Andrew Jackson Williams Papers , 1908-1910, Archives of Appalachia, East Tennessee State University...Centennial Commission of Tennessee, Tennesseans, 25-27; OR, series 1, vol. 4, 244. 63Colonel (Ret.) Armando Alfaro, “The Paper Trail of the Civil War in...observer noted that Ashby “served the balance of the war on crutches ” after receiving this wound.141 Colonel John Scott’s Kentucky Raid In July

  5. Calendar year 1993 groundwater quality report for the Upper East Fork Poplar Creek hydrogeologic regime Y-12 Plant, Oak Ridge, Tennessee: 1993 groundwater quality data interpretations and proposed program modifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-10-01

    This Groundwater Quality Report (GWQR) contains an evaluation of the groundwater quality data obtained during the 1993 calendar year (CY) at the U.S. Department of Energy (DOE) Y-12 Plant located on the DOE Oak Ridge Reservation (ORR) southeast of Oak Ridge, Tennessee (Figure 1). The groundwater quality data are presented in Part 1 of the GWQR submitted by Martin Marietta Energy Systems, Inc. (Energy Systems) to the Tennessee Department of Environment and Conservation (TDEC) in February 1994 (HSW Environmental Consultants, Inc. 1994a). Groundwater quality data evaluated in this report were obtained at several hazardous and non-hazardous waste management facilities and underground storage tanks (USTS) located within the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime). The Environmental Management Department of the Y-12 Plant Health, Safety, Environment, and Accountability Organization manages the groundwater monitoring activities in each regime under the auspices of the Y-12 Plant Groundwater Protection Program (GWPP). The purpose of the GWPP is to characterize the hydrogeology and to monitor groundwater quality at the Y-12 Plant and surrounding area to provide for protection of groundwater resources consistent with federal, state, and local requirements and in accordance with DOE Orders and Energy Systems corporate policy. The annual GWQR for the East Fork Regime is completed in two parts. Part 1 consists primarily of data appendices and serves as a reference for the groundwater quality data obtained each CY under the lead of the Y-12 Plant GWPP. Part 2 (this report) contains an evaluation of the data with respect to regime-wide groundwater quality, presents the findings and status of ongoing hydrogeologic studies, describes changes in monitoring priorities, and presents planned modifications to the groundwater sampling and analysis program for the following calendar year.

  6. Calendar year 1993 groundwater quality report for the Upper East Fork Poplar Creek hydrogeologic regime Y-12 Plant, Oak Ridge, Tennessee: 1993 groundwater quality data interpretations and proposed program modifications

    International Nuclear Information System (INIS)

    1994-10-01

    This Groundwater Quality Report (GWQR) contains an evaluation of the groundwater quality data obtained during the 1993 calendar year (CY) at the U.S. Department of Energy (DOE) Y-12 Plant located on the DOE Oak Ridge Reservation (ORR) southeast of Oak Ridge, Tennessee (Figure 1). The groundwater quality data are presented in Part 1 of the GWQR submitted by Martin Marietta Energy Systems, Inc. (Energy Systems) to the Tennessee Department of Environment and Conservation (TDEC) in February 1994 (HSW Environmental Consultants, Inc. 1994a). Groundwater quality data evaluated in this report were obtained at several hazardous and non-hazardous waste management facilities and underground storage tanks (USTS) located within the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime). The Environmental Management Department of the Y-12 Plant Health, Safety, Environment, and Accountability Organization manages the groundwater monitoring activities in each regime under the auspices of the Y-12 Plant Groundwater Protection Program (GWPP). The purpose of the GWPP is to characterize the hydrogeology and to monitor groundwater quality at the Y-12 Plant and surrounding area to provide for protection of groundwater resources consistent with federal, state, and local requirements and in accordance with DOE Orders and Energy Systems corporate policy. The annual GWQR for the East Fork Regime is completed in two parts. Part 1 consists primarily of data appendices and serves as a reference for the groundwater quality data obtained each CY under the lead of the Y-12 Plant GWPP. Part 2 (this report) contains an evaluation of the data with respect to regime-wide groundwater quality, presents the findings and status of ongoing hydrogeologic studies, describes changes in monitoring priorities, and presents planned modifications to the groundwater sampling and analysis program for the following calendar year

  7. Reindustrialization: East Tennessee Technology Park - a year later

    International Nuclear Information System (INIS)

    Clark, L.W.

    1997-01-01

    DOE''s Oak Ridge Operations (ORO) continues to be a vital part of the nation''s energy and defense complex. Accordingly ORO must continue to position itself to take advantage of unique strengths and capabilities developed over the past five decades. This repositioning must always occur in the context of national policy debates and sometimes harsh budget realities. One important fact needs to be reinforced, the long-term budget situation, which has been termed the billion-dollar challenge, is going to cast a long shadow over every strategic decision made at ORO. A little less than two years ago Jim Hall, Manager of Oak Ridge Operations, began an effort to refocus the long term goals of the DOE Oak Ridge Complex. He called this new road map for the future Oak Ridge Vision 2010, and this vision statement acknowledges DOE''s significant economic and technical ties in the East Tennessee region and its role in maintaining a vigorous economic climate. Reindustrialization, a key component in the Oak Ridge vision, has been defined as a method of accomplishment for decontamination and decommissioning, that uses the value of DOE assets in the form of surplus materials and underutilized equipment and facilities, to attract private sector investment in facility clean-up. Reindustrialization is one of the vehicles through which ORO is realizing its vision of transforming the Oak Ridge Complex into an economically viable integrated science, education, technology, and industrial complex operated in partnership with the private sector. Reindustrialization is also an opportunity for this region to 'privatize' and reduce its dependence on an ever-decreasing federal budget

  8. Indoor air quality study of forty east Tennessee homes

    Energy Technology Data Exchange (ETDEWEB)

    Hawthorne, A.R.; Gammage, R.B.; Dudney, C.S.; Hingerty, B.E.; Schuresko, D.D.; Parzyck, D.C.; Womack, D.R.; Morris, S.A.; Westley, R.R.; White, D.A.

    1984-12-01

    Over a one-year period, measurements of indoor air pollutants (CO/sub x/, NO/sub x/, formaldehyde, volatile organics, particulates, and radon) were made in 40 homes in East Tennessee. The houses were of various ages with different types of insulation and heating. Over one-half of the houses exceeded the ASHRAE indoor ceiling guideline of 0.1 ppM for formaldehyde on at least one occasion. Over the duration of the study, older houses averaged 0.04 ppM of formaldehyde while houses less than 5 years old averaged 0.08 ppM (P < 0.01). The highest concentration of formaldehyde measured was 0.4 ppM in a new home. Diurnal and seasonal fluctuations in levels of formaldehyde in some homes were as much as twofold and tenfold, respectively. The highest levels of formaldehyde were usually recorded during summer months. The concentration in indoor air of various organics was at least tenfold higher than in outdoor air. Carbon monoxide and nitrgen oxides were usually <2 and <0.02 ppM, respectively, except when gas stoves or kerosene space heaters were operating, or when a car was running in the garage. In 30% of the houses, the annual indoor guideline for radon, 4 pCi/L, was exceeded. The mean radon level in houses built on the ridgelines was 4.4 pCi/L, while houses located in the valleys had a mean level of 1.7 pCi/L (P < 0.01). The factor having the most impact on infiltration was operation of the central duct fan of the heating, ventilation, and air conditioning system. The mean rate of air exchange increased from 0.39 to 0.74 h/sup -1/ when the duct fan was operated (measurements prior to December 1982). This report presents the study design and implementation, describes the monitoring protocols, and provides a complete set of the data collected during the project. 25 references, 29 figures, 42 tables.

  9. Investigation of shallow groundwater contamination near East Fork Poplar Creek, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Carmichael, J.K.

    1989-01-01

    Alluvial soils of the flood plain of East Fork Poplar Creek in Oak Ridge, Tennessee, are contaminated with mercury and other metals, organic compounds, and radionuclides originating from the Y-12 Plant, a nuclear-processing facility located within the US Department of Energy's Oak Ridge Reservation. Observation wells were installed in the shallow aquifer of the flood plain, and water quality samples were collected to determine if contaminants are present in the shallow groundwater. Groundwater in the shallow aquifer occurs under water-table conditions. Recharge is primarily from precipitation and discharge is to East Fork Poplar Creek. Groundwater levels fluctuate seasonally in response to variations in recharge and evapotranspiration. During extremely dry periods, the water table drops below the base of the shallow aquifer in some flood-plain areas. Contaminants were found in water samples from several of the wells in concentrations which equaled or exceeded drinking-water standards established by the US Environmental Protection Agency are antimony, chromium, lead, mercury, selenium, phenols, and strontium-90. Total and dissolved uranium concentrations exceeded the analytical detection limit in nearly 70% of the wells in the flood plain. The results of water quality determinations demonstrate that elevated concentrations of most trace metals (and possibly organic compounds and radionuclides) were caused by contaminated sediments in the samples. The presence of contaminated sediment in samples is suspected to be the result of borehole contamination during well installation. 21 refs., 20 figs., 6 tabs

  10. Major anthropogenic causes for and outcomes of wild animal presentation to a wildlife clinic in East Tennessee, USA, 2000-2011.

    Directory of Open Access Journals (Sweden)

    Ashley N Schenk

    Full Text Available To determine the reasons for presentation and outcome of wildlife cases in East Tennessee, a retrospective analysis was performed using 14,303 records from cases presented to the wildlife clinic of the University of Tennessee Veterinary Teaching Hospital between 2000 and 2011. The cases were first categorized into amphibian/non-avian reptile, mammal, or avian and then classified into groups based on the primary admitting/presenting sign. There are a variety of reasons animals were presented to the clinic, and some were directly or indirectly anthropogenic in origin, including cat related, dog related, hit by automobile, and other human encounters leading to trauma; of the cases reviewed, 4,443 (31.1% presented for one of these 4 reasons. Overall case fatality risk in regard to these 4 admitting/presenting signs was 0.519 for the amphibian/non-avian reptile cases, 0.675 for mammal cases, and 0.687 for avian cases. This study confirms the importance of monitoring wildlife morbidity and mortality and of focusing efforts to reduce the anthropogenic threat on native habitats and resident wildlife populations.

  11. Fluid inclusion gas chemistry in east Tennessee Mississippi Valley-type districts: Evidence for immiscibility and implications for depositional mechanisms

    Energy Technology Data Exchange (ETDEWEB)

    Jones, H.D.; Kesler, S.E. (Univ. of Michigan, Ann Arbor (United States))

    1992-01-01

    Analyses of fluid inclusion gases from Mississippi Valley-type districts in east Tennessee reveal the presence of several distinct aqueous solutions and vapors that were part of the mineralizing process. Inclusion contents were released by crushing 5 to 25 mg mineral samples and by decrepitating individual inclusions; all analyses were obtained by quadrupole mass spectrometry. Most analyzed inclusion fluids consist of H{sub 2}O with significant amounts of CH{sub 4} (0.3 to 2.9 mol%), CO{sub 2} (0.1 to 4.7 mol%), and smaller amounts of C{sub 2}H{sub 6}, C{sub 3}H{sub 8}, H{sub 2}S, SO{sub 2}, N{sub 2}, and Ar. Compositional similarities in the inclusion fluids from three districts imply that mineralization probably formed from fluids that permeated the entire region. Saturation pressures calculated for these fluid compositions range from 300 to 2,200 bars. Burial depths for the host unit have been estimated to be about 2 to 3 km during Devonian time, the age of mineralization indicated by recent isotopic ages. Exsolution of a vapor phase from the mineralizing brines should cause precipitation of carbonate and sulfide minerals, but reaction path modeling indicates that the resulting sparry dolomite:sphalerite ratios would be too high to form an ore-grade deposit. If the vapor phase was from a preexisting sour gas cap that was intercepted by a Zn-rich brine, large amounts of spalerite would precipitate in a fairly small region. Preliminary mass balance calculations suggest that a gas cap of dimensions similar to the individual districts in east Tennessee could have contained enough H{sub 2}S to account for the total amount of sphalerite precipitated.

  12. Air pressure distribution and radon entry processes in east Tennessee schools

    International Nuclear Information System (INIS)

    Sinclair, L.D.; Dudney, C.S.; Wilson, D.L.; Saultz, R.J.

    1990-01-01

    Many building characteristics have been found to influence radon entry, including building size and configuration, substructure, location of utility supply lines, and design and operation of the heating, ventilation, and air conditioning (HVAC) system. One of the most significant factors is room depressurization resulting from the HVAC system exhausting more than it supplies. This paper represents a preliminary assessment of HVAC characteristics and how they may relate to radon entry. During the summer of 1989, a limited survey was made of air pressure and radon levels in four schools in eastern Tennessee. Short-term samples of radon and pressure were made in all rooms in contact with the soil using alpha scintillation cells and an electronic microanometer, respectively. The pressure difference and radon concentration changes induced by operation of the building ventilation system varied among sites within individual schools

  13. World Record Earned Value Management System Certification for Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 13181

    Energy Technology Data Exchange (ETDEWEB)

    Haynes, Ray; Hirschy, Anita [URS - CH2M Oak Ridge, LLC (UCOR), East Tennessee Technology Park D and D and Environmental Remediation Project, Oak Ridge, Tennessee 37830 (United States)

    2013-07-01

    On projects that require Earned Value Management (EVMS) Certification, it is critical to quickly prepare for and then successfully obtain certification. This is especially true for government contracts. Projects that do poorly during the review are subject to financial penalties to their company and they lose creditability with their customer creating problems with the project at the outset. At East Tennessee Technology Park (ETTP), we began preparing for Department of Energy (DOE) certification early during proposal development. Once the contract was awarded, while still in transition phase from the previous contractor to our new company, we immediately began reviewing the project controls systems that were in place on the project and determined if any replacements needed to be made immediately. The ETTP contract required the scheduling software to be upgraded to Primavera P6 and we determined that no other software changes would be done prior to certification. Next, preparation of the Project Controls System Description (PCSD) and associated procedures began using corporate standards as related to the project controls systems. During the transition phase, development was started on the Performance Measurement Baseline which is the resource loaded schedule used to measure our performance on the project and which is critical to good Earned Value Management of the project. Early on, and throughout the baseline review, there was positive feedback from the Department of Energy that the quality of the new baseline was good. Having this superior baseline also contributed to our success in EVMS certification. The combined companies of URS and CH2M Hill had recent experience with certifications at other Department of Energy sites and we were able to capitalize on that knowledge and experience. Generic PCSD and procedures consistent with our co-operations approach to Earned Value Management were available to us and were easily tailorable to the specifics of our contract

  14. World Record Earned Value Management System Certification for Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 13181

    International Nuclear Information System (INIS)

    Haynes, Ray; Hirschy, Anita

    2013-01-01

    On projects that require Earned Value Management (EVMS) Certification, it is critical to quickly prepare for and then successfully obtain certification. This is especially true for government contracts. Projects that do poorly during the review are subject to financial penalties to their company and they lose creditability with their customer creating problems with the project at the outset. At East Tennessee Technology Park (ETTP), we began preparing for Department of Energy (DOE) certification early during proposal development. Once the contract was awarded, while still in transition phase from the previous contractor to our new company, we immediately began reviewing the project controls systems that were in place on the project and determined if any replacements needed to be made immediately. The ETTP contract required the scheduling software to be upgraded to Primavera P6 and we determined that no other software changes would be done prior to certification. Next, preparation of the Project Controls System Description (PCSD) and associated procedures began using corporate standards as related to the project controls systems. During the transition phase, development was started on the Performance Measurement Baseline which is the resource loaded schedule used to measure our performance on the project and which is critical to good Earned Value Management of the project. Early on, and throughout the baseline review, there was positive feedback from the Department of Energy that the quality of the new baseline was good. Having this superior baseline also contributed to our success in EVMS certification. The combined companies of URS and CH2M Hill had recent experience with certifications at other Department of Energy sites and we were able to capitalize on that knowledge and experience. Generic PCSD and procedures consistent with our co-operations approach to Earned Value Management were available to us and were easily tailorable to the specifics of our contract

  15. Deep Residential Retrofits in East Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Boudreaux, Philip R [ORNL; Hendrick, Timothy P [ORNL; Christian, Jeffrey E [ORNL; Jackson, Roderick K [ORNL

    2012-04-01

    Executive Summary Oak Ridge National Laboratory (ORNL) is furthering residential energy retrofit research in the mixed-humid climate of East Tennessee by selecting 10 homes and guiding the homeowners in the energy retrofit process. The homeowners pay for the retrofits, and ORNL advises which retrofits to complete and collects post-retrofit data. This effort is in accordance with the Department of Energy s Building America program research goal of demonstrating market-ready energy retrofit packages that reduce home energy use by 30 50%. Through this research, ORNL researchers hope to understand why homeowners decide to partake in energy retrofits, the payback of home energy retrofits, and which retrofit packages most economically reduce energy use. Homeowner interviews help the researchers understand the homeowners experience. Information gathered during the interviews will aid in extending market penetration of home energy retrofits by helping researchers and the retrofit industry understand what drives homeowners in making positive decisions regarding these retrofits. This report summarizes the selection process, the pre-retrofit condition, the recommended retrofits, the actual cost of the retrofits (when available), and an estimated energy savings of the retrofit package using EnergyGauge . Of the 10 households selected to participate in the study, only five completed the recommended retrofits, three completed at least one but no more than three of the recommended retrofits, and two households did not complete any of the recommended retrofits. In the case of the two homes that did none of the recommended work, the pre-retrofit condition of the homes and the recommended retrofits are reported. The five homes that completed the recommended retrofits are monitored for energy consumption of the whole house, appliances, space conditioning equipment, water heater, and most of the other circuits with miscellaneous electric loads (MELs) and lighting. Thermal comfort is

  16. Is the Level of Student Academic Performance in Tennessee Public School Systems Related to Level of Expenditures for School Systems?

    Science.gov (United States)

    Leuthold, Frank O.

    The 1992 Tennessee Education Improvement Act resulted from a successful law suit by smaller and poorer school systems in Tennessee concerning equity of funding. The Act established the Basic Education Program (BEP), which increased the state sales tax rate, shifted state funds from better funded to poorer school systems, and required systematic…

  17. Explanation of Significant Differences for the Record of Decision for Interim Actions in Zone 1, East Tennessee Technology Park, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Jacobs

    2011-02-01

    Zone 1 is a 1400-acre area outside the fence of the main plant at The East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Record of Decision for Interim Actions in Zone, ETTP (Zone 1 Interim ROD) (DOE 2002) identifies the remedial actions for contaminated soil, buried waste, and subsurface infrastructure necessary to protect human health and to limit further contamination of groundwater. Since the Zone 1 Interim Record of Decision (ROD) was signed, new information has been obtained that requires the remedy to be modified as follows: (1) Change the end use in Contractor's Spoil Area (CSA) from unrestricted industrial to recreational; (2) Remove Exposure Units (EU5) ZI-50, 51, and 52 from the scope of the Zone I Interim ROD; (3) Change the end use of the duct bank corridor from unrestricted industrial to restricted industrial; and (4) Remove restriction for the disturbance of soils below 10 feet in Exposure Unit (EU) Z1-04. In accordance with 40 Code of Federal Regulations (CFR) 300.435, these scope modifications are a 'significant' change to the Zone 1 Interim ROD. In accordance with CERCLA Sect. 117 (c) and 40 CFR 300.435 (c)(2)(i), such a significant change is documented with an Explanation of Significant Differences (ESD). The purpose of this ESD is to make the changes listed above. This ESD is part of the Administrative Record file, and it, and other information supporting the selected remedy, can be found at the DOE Information Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee 37830, from 8:00 a.m. to 5:00 p.m., Monday through Friday. The ORR is located in Roane and Anderson counties, within and adjacent to the corporate city limits of Oak Ridge, Tennessee. ETTP is located in Roane County near the northwest corner of the ORR. ETTP began operation during World War II as part of the Manhattan Project. The original mission of ETTP was to produce enriched uranium for use in atomic weapons. The plant produced enriched uranium from

  18. Environmental Baseline Survey Report for the Title Transfer of Land Parcel ED-4 at the East Tennessee Technology Park, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    SAIC

    2008-05-01

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of a land parcel referred to as 'ED-4' (ED-4) at the U. S. Department of Energy's (DOE's) East Tennessee Technology Park (ETTP). DOE is proposing to transfer the title of this land to the Heritage Center, LLC. Parcel ED-4 is a land parcel that consists of two noncontiguous areas comprising a total of approximately 18 acres located east of the ETTP. The western tract of ED-4 encompasses approximately 8.5 acres in the northeastern quadrant of the intersection of Boulevard Road and Highway 58. The eastern tract encompasses an area of approximately 9.5 acres in the northwestern quadrant of the intersection of Blair Road and Highway 58 (the Oak Ridge Turnpike). Aerial photographs and site maps from throughout the history of the ETTP, going back to its initial development in the 1940s as the Oak Ridge Gaseous Diffusion Plant (ORGDP), indicate that this area has been undeveloped woodland with the exception of three support facilities for workers constructing the ORGDP since federal acquisition in 1943. These three support facilities, which were located in the western tract of ED-4, included a recreation hall, the Town Hall Camp Operations Building, and the Property Warehouse. A railroad spur also formerly occupied a portion of Parcel ED-4. These former facilities only occupied approximately 5 percent of the total area of Parcel ED-4. This report provides supporting information for the transfer of this government-owned property at ETTP to a non-federal entity. This EBS is based upon the requirements of Sect. 120(h) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). In order to support a Clean Parcel Determination (CPD) in accordance with CERCLA Sect. 120(h)(4)(d), groundwater and sediment samples were collected within, and adjacent to, the Parcel ED-4 study area. The potential for DOE to make a CPD for ED-4 is

  19. Lessons learned at Lower East Fork Poplar Creek, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burch, K.L.; Page, D.G.

    1996-01-01

    The US Department of Energy (DOE) used several innovative strategies and technologies in conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) activities for the Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. These innovations helped to cost-effectively characterize the 270-ha (670-acre), 23.3-km (14.5-mile) floodplain and to obtain a 400-parts per million (ppm) cleanup level for mercury in soil. Lessons learned during the project involve management, investigation, and risk assessment strategies and techniques. Management lessons learned include (a) how to handle the large OU, (b) how to effectively involve the community in decisions, and (c) how to select a remedy that incorporates the needs of many involved agencies. Investigation lessons learned include (a) how to design an effective sampling strategy for the site, (b) how to cost-effectively analyze a large number of samples, and (c) which of several treatment technologies is best-suited to the site. Risk assessment lessons learned include (a) how to determine an appropriate cleanup level for human health and the environment, (b) how to quantify uncertainty in the human health risk assessment, (c) how to reconcile different solubilities of different mercury species, and (d) how to best conduct the ecological risk assessment. Other CERCLA sites can benefit from lessons learned during this project whether still in the investigative stage or further along in the process. Applying these lessons can substantially reduce costs and make more efficient use of Superfund resources

  20. Evaluation of a Spotted Fever Group Rickettsia Public Health Surveillance System in Tennessee.

    Science.gov (United States)

    Fill, Mary-Margaret A; Moncayo, Abelardo C; Bloch, Karen C; Dunn, John R; Schaffner, William; Jones, Timothy F

    2017-09-01

    Spotted fever group (SFG) rickettsioses are endemic in Tennessee, with ∼2,500 cases reported during 2000-2012. Because of this substantial burden of disease, we performed a three-part evaluation of Tennessee's routine surveillance for SFG rickettsioses cases and deaths to assess the system's effectiveness. Tennessee Department of Health (TDH) SFG rickettsioses surveillance records were matched to three patient series: 1) patients with positive serologic specimens from a commercial reference laboratory during 2010-2011, 2) tertiary medical center patients with positive serologic tests during 2007-2013, and 3) patients identified from death certificates issued during 1995-2014 with SFG rickettsiosis-related causes of death. Chart reviews were performed and patients were classified according to the Council of State and Territorial Epidemiologists' case definition. Of 254 SFG Rickettsia -positive serologic specimens from the reference laboratory, 129 (51%) met the case definition for confirmed or probable cases of rickettsial disease after chart review. The sensitivity of the TDH surveillance system to detect cases was 45%. Of the 98 confirmed or probable cases identified from the medical center, the sensitivity of the TDH surveillance system to detect cases was 34%. Of 27 patients identified by death certificates, 12 (44%) were classified as confirmed or probable cases; four (33%) were reported to TDH, but none were correctly identified as deceased. Cases of SFG rickettsioses were underreported and fatalities not correctly identified. Efforts are needed to improve SFG rickettsiosis surveillance in Tennessee.

  1. Exploring No-Cost Opportunities for Public Sector Information Systems Energy Efficiency: A Tennessee Application

    Directory of Open Access Journals (Sweden)

    Kendra Abkowitz Brooks

    2015-11-01

    Full Text Available The Tennessee Department of Environment and Conservation (TDEC completed a pilot project within its Central Office spaces to test the utilization of computer power management (CPM technologies to implement power saving settings on state-owned, network-connected computer equipment. Currently, the State of Tennessee has no clear protocol regarding energy-conserving power settings on state-owned machines. Activation of monitor sleep modes and system standby and hibernation modes on 615 Central Office computers over an 18-month period reduced energy consumption by an estimated 8093 kWh and $526 per month, amounting to approximately $6312 in cost savings for Tennessee annually. If implemented throughout State of Tennessee executive agencies across the state, energy cost savings could amount to an estimated $323,341 annually. The research endeavored to understand both positive and negative impacts that strategic power management approaches can have on energy consumption, worker productivity, network security, and state budgets. Nearly all impacts discussed were positive. Based on successful results within TDEC Central Office spaces in Tennessee Tower, and considering the potential cost savings that could be achieved, expansion of the implementation of computer power management policies to machines in offices across the state was recommended.

  2. Calendar year 1995 groundwater quality report for the upper east Fork Poplar Creek Hydrogeologic regime, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. 1995 Groundwater quality data and calculated rate of contaminant migration

    International Nuclear Information System (INIS)

    1996-02-01

    This annual groundwater quality report (GWQR) contains groundwater and surface water quality data obtained during the 1995 calendar year (CY) at several waste management facilities associated with the U.S. Department of Energy (DOE) Y-12 Plant located on the DOE Oak Ridge Reservation (ORR) southeast of Oak Ridge, Tennessee. The U.S. Environmental Protection Agency (EPA) identification number for the Y-12 Plant is TN3 89 009 0001. The sites addressed by this document are located within the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime). The East Fork Regime, which is one of three hydrogeologic regimes defined for the purposes of groundwater quality monitoring at the Y-12 Plant, encompasses the Y-12 Plant

  3. Lease of Parcel ED-1 of the Oak Ridge Reservation by the East Tennessee Economic Council

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The US Department of Energy (DOE) has completed an environmental assessment (DOE/EA-1113) for the proposed lease of 957.16 acres of the Oak Ridge Reservation (ORR) to the East Tennessee Economic Council (ETEC), a non-profit community organization, for a period of 10 years, with an option for renewal. ETEC proposes to develop an industrial park on the leased site to provide employment opportunities for DOE and contractor employees affected by decreased federal funding. Based on the results of the analysis reported in the EA and implementation of mitigation measures defined in this Finding of No Significant Impact (FONSI), DOE has determined that the proposed action is not a major Federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement (EIS) is not necessary, and DOE is issuing this mitigated FONSI. DOE will implement a Mitigation Action Plan for this project and provide annual reports on mitigation and monitoring.

  4. Solar heating system installed at Jackson, Tennessee. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    The solar energy heating system installed at the Coca-Cola Bottling Works in Jackson, Tennessee is described. The system consists of 9480 square feet of Owens-Illinois evacuated tubular solar collectors with attached specular cylindrical reflectors and will provide space heating for the 70,000 square foot production building in the winter, and hot water for the bottle washing equipment the remainder of the year. Component specifications and engineering drawings are included. (WHK)

  5. An inventory of wetlands in the East Fork Poplar Creek floodplain, Anderson and Roane Counties, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-12-01

    An inventory of wetlands within the floodplain of East Fork Poplar Creek (EFPC) in Anderson and Roane Counties, Tennessee was conducted during October, 1991 through May, 1992 for the US Department of Energy (DOE) by the US Army Corps of Engineers, Nashville District. About 15 miles of EFPC channel and 500 acres of its floodplain are contaminated with mercury and other contaminants released from the Y-12 Plant on the DOE Oak Ridge Reservation. The wetland inventory will serve as baseline information for DOE`s remedial action planning and National Environmental Policy Act compliance efforts related to the contamination. In order to provide broad wetland determinations beyond which future wetland definitions are unlikely to expand, the 1989 Federal Manual for Identifying And Delineating Jurisdictional Wetlands was utilized. Using the manual`s methodology in a contaminated system under the approved health and safety plan presented some unique problems, resulting in intrusive sampling for field indicators of hydric soils being accomplished separately from observation of other criteria. Beginning with wetland areas identified on National Wetland Inventory Maps, the entire floodplain was examined for presence of wetland criteria, and 17 wetlands were identified ranging from 0.01 to 2.81 acres in size. The majority of wetlands identified were sized under 1 acre. Some of the wetlands identified were not delineated on the National Wetland Inventory Maps, and much of the wetland area delineated on the maps did not meet the criteria under the 1989 manual.

  6. Remedial design work plan for Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-10-01

    The Remedial Design Work Plan (RDWP) for Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. This remedial action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing contaminated floodplain soil. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Federal Facility Agreement (FFA) (1992). In accordance with the FFA, a remedial investigation (RI) (DOE 1994a) and a feasibility study (DOE 1994b) were conducted to assess contamination of the Lower EFPC and propose remediation alternatives. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative by the feasibility study was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Following the remedial investigation/feasibility study, and also in accordance with the FFA, a proposed plan was prepared to more fully describe the proposed remedy.

  7. Fiscal Year 1998 Well Installation, Plugging and Abandonment, and Redevelopment summary report Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-12-01

    This report summarizes the well installation, plugging and abandonment, and redevelopment activities conducted during the federal fiscal year (FY) 1998 at the Y-12 Plant, Oak Ridge, Tennessee. Five new groundwater monitoring wells were installed at the Y-12 Plant under the FY 1998 drilling program. Two of the wells are located in west Bear Creek Valley, one is in the eastern Y-12 Plant area near Lake Reality, and two are located near the Oil Landfarm Waste Management Area, which were installed by Bechtel Jacobs Company LLC (Bechtel Jacobs) as part of a site characterization activity for the Oak Ridge Reservation (ORR) Disposal Cell. Also, two existing wells were upgraded and nine temporary piezometers were installed to characterize hydrogeologic conditions at the Disposal Cell site. In addition, 40 temporary piezometers were installed in the Boneyard/Bumyard area of Bear Creek Valley by Bechtel Jacobs as part of the accelerated remedial actions conducted by the Environmental Restoration Program. Ten monitoring wells at the Y-12 Plant were decommissioned in FY 1998. Two existing monitoring wells were redeveloped during FY 1998 (of these, GW-732 was redeveloped tsvice). All well installation and development (including redevelopment) was conducted following industry-standard methods and approved procedures from the Environmental Surveillance Procedures Quality Control Program (Energy Systems 1988); the Resource Conservation and Recovery Act (RCRA) Groundwater Monitoring Technical Enforcement Guidance Document (EPA 1992); and the Monitoring Well Installation Plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee (Energy Systems 1997a). Well installation and development of the non-Y-12 Plant GWPP oversight installation projects were conducted using procedures/guidance defined in the following documents: Work Plan for Support to Upper East Fork Poplar Creek East End Volatile Organic Compound Plumes Well Installation Project, Oak Ridge Y-12 Plant, Oak Ridge

  8. Environmental restoration of mercury contamination of East Fork Poplar Creek at the Department of Energy's Oak Ridge, Tennessee, reservation

    International Nuclear Information System (INIS)

    Page, D.G.

    1995-01-01

    During the open-quotes Cold Warclose quotes era, approximately 239,000 pounds of mercury were released from the Y-12 Nuclear Weapons Plant to the East Fork Poplar Creek watershed. As a result, approximately 75 tons of the contaminant resides within the floodplain soils beyond the confines of the DOE reservation, a Federal Superfund Site. The EFPC watershed encompasses multiple land uses whose ownership varies from private citizens, municipal government, and federal government. DOE, in cooperation with the State of Tennessee and EPA, proposes to clean up the contamination to a risk based standard of 400 ppm. This level has been determined to be protective of human health and the environment. The remedial process and development of the remedial alternative are the result of close interagency cooperation between the State, EPA, U.S. Fish ampersand Wildlife Service, and the Army Corps of Engineers. This case study outlines that process

  9. Tennessee's East Fork Poplar Creek: A biological monitoring and abatement program

    International Nuclear Information System (INIS)

    Halbrook, R.S.; Loar, J.M.; Adams, S.M.; Black, M.C.; Boston, H.L.; Greeley, M.S. Jr.; Hill, W.R.; Hinzman, R.L.; McCarthy, J.F.; Peterson, M.J.; Ryon, M.G.; Schilling, E.M.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.; Gatz, A.J.

    1991-01-01

    On May 1985, a Biological Monitoring Program was developed for East Fork Poplar Creek (EFPC) in eastern Tennessee, United States. This stream originates within the Oak Ridge Y-12 Plant that produces nuclear weapons components for the Department of Energy. Water and sediment in the stream contain metals, organic chemicals, and radionuclides from releases that have occurred over the past 45 years. The creek also receives urban and some agricultural runoff and effluent from the City of Oak Ridge's Wastewater Treatment Facility (WTF). The biological monitoring program includes four major tasks: (1) ambient toxicity testing: (2) bioaccumulation studies; (3) biological indicator studies; and (4) ecological monitoring of stream communities, including periphyton, benthic macroinvertebrates, and fish. Biological conditions are monitored at six sites on EFPC ranging from kilometer 24.4 near the headwaters to kilometer 6.3 near the month. A site on Brushy Fork, A stream just north of Oak Ridge, is used as reference. Ambient (instream) toxicity was monitored through the use of 7-day static-renewal tests that measured the survival and growth of fathead minnow (Pimephales promelas) larvae and the survival and reproduction of a microstrustacean (Ceriodaphnia dubia). Full-strength water from EFPC within the Y-12 Plant boundary was frequently toxic to Ceriodaphnia, but less frequently toxic to the minnow larvae. Chlorine has been identified as an important toxicant in upper EFPC. Water samples from six sites in EFPC downstream from the Y-12 Plant boundary were tested eight times with both species during a 2-year period (October, 1986 through October, 1988). These sites were ranked by the number of times they were ''best'' or ''worst'' for each species. Water samples collected for use in the ambient toxicity tests were routinely analyzed for conductivity, pH, alkalinity, hardness, total residual and free chlorine, and temperature

  10. Work plan for support to Upper East Fork Poplar Creek east end VOC plumes well installation project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    Under the Resource Conservation and Recovery Act of 1976 guidelines and requirements from the Tennessee Department of Environment and Conservation (TDEC), the Y-12 Plant initiated investigation and monitoring of various sites within its boundaries in the mid-1980s. The entire Oak Ridge Reservation (ORR) was placed on the National Priorities List of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) sites in November 1989. Following CERCLA guidelines, sites within the ORR require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) or an engineering evaluation/cost analysis (EE/CA) of potential remedial actions. Data from monitoring wells at the east end of the Y-12 Plant have identified an area of groundwater contamination dominated by the volatile organic compound (VOC) carbon tetrachloride; other VOCs include chloroform, tetrachloroethene, and trichloroethene

  11. Work plan for support to Upper East Fork Poplar Creek east end VOC plumes well installation project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Under the Resource Conservation and Recovery Act of 1976 guidelines and requirements from the Tennessee Department of Environment and Conservation (TDEC), the Y-12 Plant initiated investigation and monitoring of various sites within its boundaries in the mid-1980s. The entire Oak Ridge Reservation (ORR) was placed on the National Priorities List of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) sites in November 1989. Following CERCLA guidelines, sites within the ORR require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) or an engineering evaluation/cost analysis (EE/CA) of potential remedial actions. Data from monitoring wells at the east end of the Y-12 Plant have identified an area of groundwater contamination dominated by the volatile organic compound (VOC) carbon tetrachloride; other VOCs include chloroform, tetrachloroethene, and trichloroethene.

  12. Preliminary studies of bobcat activity patterns. [In mountainous forests of eastern Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Kitchings, J.T.; Story, J.D.

    1978-01-01

    Home range and activity patterns were determined for two radio-collared bobcats, one male and one female, in an eastern Tennessee hardwood forest. Home range of the male was calculated to be approximately 3076 ha while the female utilized 1416 ha. Both bobcats' ranges were larger than previously reported values for the southeast. Measurements of both average net distance traveled per day showed the male moved a statistically significant greater distance than the female. The larger home ranges may be primarily the result of relatively low prey populations in the mountainous terrain of East Tennessee as compared to upper coastal plains areas where most of the previous research on southeastern bobcats has been carried out.

  13. An archaeological reconnaissance of a 14 mile section of the East Fork Poplar Creek for the Environmental Restoration Project, Anderson and Roane Counties, Tennessee

    International Nuclear Information System (INIS)

    DuVall, G.D.

    1993-01-01

    At the request of the US Army Corps of Engineers, Nashville District, Nashville, Tennessee, an archaeological reconnaissance of the potential impact areas of the Environmental Restoration Project (ERP) along the East Fork Poplar Creek was conducted during the period December 16, 1991, and March 3, 1992. The reconnaissance was conducted in response to environmental evaluations as a result of the accidental spillage of approximately 293,000 pounds of mercury, radionuclides, heavy metals and other compounds. The reconnaissance to assess adverse impacts to cultural resources located within the boundaries of Federally-licensed, permitted, funded or assisted projects was conducted in compliance with the National Historic Preservation Act of 1966, National Environmental Policy Act of 1969 and Executive Order 11593

  14. East Tennessee hydrogen initiative Chattanooga : charting a course for the region's hydrogen transportation infrastructure.

    Science.gov (United States)

    2009-07-30

    This report documents the results of the research project completed by the Center for Energy, Transportation and the Environment (CETE) at the University of Tennessee at Chattanooga (UTC) under Federal Transit Administration Cooperative Agreement TN-...

  15. Medical Education for Tennessee. A Report of the Tennessee Higher Education Commission.

    Science.gov (United States)

    Boone, Jerry N.; Woods, Myra S.

    This study of medical education was conducted as a part of the Tennessee Higher Education Commission's responsibility to design a master plan for higher education in Tennessee. It provides a background of information on Tennessee's needs for physicians and on the production of physicians by the three medical schools in the state. The study…

  16. ENVIRONMENTAL BASELINE SURVEY REPORT FOR WEST BLACK OAK RIDGE, EAST BLACK OAK RIDGE, MCKINNEY RIDGE, WEST PINE RIDGE, AND PARCEL 21D IN THE VICINITY OF THE EAST TENNESSEE TECHNOLOGY PARK, OAK RIDGE, TENNESSEE

    Energy Technology Data Exchange (ETDEWEB)

    David A. King

    2012-11-29

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of five land parcels located near the U.S. Department of Energy’s (DOE’s) East Tennessee Technology Park (ETTP), including West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge, and Parcel 21d. The goal is to obtain all media no-further-investigation (NFI) determinations for the subject parcels considering existing soils. To augment the existing soils-only NFI determinations, samples of groundwater, surface water, soil, and sediment were collected to support all media NFI decisions. The only updates presented here are those that were made after the original issuance of the NFI documents. In the subject parcel where the soils NFI determination was not completed for approval (Parcel 21d), the full process has been performed to address the soils as well. Preparation of this report included the detailed search of federal government records, title documents, aerial photos that may reflect prior uses, and visual inspections of the property and adjacent properties. Interviews with current employees involved in, or familiar with, operations on the real property were also conducted to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes may have been released or disposed. In addition, a search was made of reasonably obtainable federal, state, and local government records of each adjacent facility where there has been a release of any hazardous substance or any petroleum product or their derivatives, including aviation fuel and motor oil, and which is likely to cause or contribute to a release of any hazardous substance or any petroleum product or its derivatives, including aviation fuel or motor oil, on the real property. A radiological survey and soil/sediment sampling was conducted to assess baseline conditions of Parcel 21d that were not addressed by the soils-only NFI

  17. Field studies on the terrestrial behavior of actinide elements in East Tennessee

    International Nuclear Information System (INIS)

    Garten, C.T. Jr.; Bondietti, E.A.; Trabalka, J.R.; Walker, R.L.; Scott, T.G.

    1984-01-01

    Field studies on the comparative uptake of various actinide elements ( 232 Th, 233 U, 238 U, 239 Pu, 241 Am, and 244 Cm) by plants and animals inhabiting historically contaminated environments on the Oak Ridge National Laboratory (ORNL) reservation in East Tennessee are summarized. The present-day pattern of actinide element bioaccumulation from a flood plain site contaminated with Pu in 1944 is U > Th approx. Pu. Thus the environmentally dispersed 239 Pu exhibits a transfer from floodplain soil to biota comparable to that of indigenous 232 Th and less than that of the indigenous 238 U. This ranking agrees with the chemical extractability of U, Th, and Pu from soil, using either weak acids or strongly basic reagents. The pattern of actinide element uptake from the shoreline of a historically contaminated pond is Pu 238 U = 233 U. This ranking also agrees with the chemical extractability of Pu, Am, Cm, and U from shoreline sediment, using weak acids. Results from field studies at ORNL agree with what has been generally inferred about the relative food chain transfer of the actinides, based on laboratory studies and field studies at other sites in the United States. Because they share the same valence state, there are apparent strong similarities in soil sorption, plant uptake, and animal uptake between trivalent Am and Cm and between tetravalent Pu and Th. Available evidence suggests that knowledge of the behavior of naturally occurring 232 Th in the terrestrial food chain can be useful for predicting the long-term fate of environmentally dispersed 239 Pu, while data on 238 U might be used to place an upper limit on the expected long-term food chain transfer of all transuranic elements except Np. 33 references, 5 figures, 1 table

  18. Strategy for definition and protection of east Tennessee karst groundwater basins

    International Nuclear Information System (INIS)

    Rubin, P.A.; Lemiszki, P.J.; Poling, R.S.

    1992-01-01

    This paper describes and gives suggestions for protecting the bedrock geology of eastern Tennessee which is typical of the southern Appalachian Valley and Ridge province. Carbonate beds (limestones and dolomites) of the Knox and Chickamauga Groups are bounded by non-carbonate beds, most of which strike northeast and dip steeply (10 degrees--45 degrees) to the southeast. The carbonate aquifers are maturely karstified and are extremely vulnerable to contaminant infiltration, thus necessitating appropriate land use planning focused on their environmental sensitivity. Urban expansion is resulting in greater land development in karst regions. Planned and existing activities produce wastes that may potentially leach into underlying karst systems. This waste may flow rapidly and untreated for many miles along strike. The potential degradation of aquifers and receiving streams due to the cumulative waste loading of numerous small enterprises may be more environmentally destructive than a few hazardous waste sites. Costs to remediate contaminated water supplies and streams can be in the millions of dollars versus the substantially lower costs of prudent land use planning

  19. Reuse of East Tennessee Technology Park (Former K-25 Site) on the Oak Ridge Reservation: Progress, Problems, and Prospects

    International Nuclear Information System (INIS)

    Gawarecki, S.L.

    2009-01-01

    East Tennessee Technology Park (ETTP) is the former K-25 site on the Department of Energy's (DOE) Oak Ridge Reservation, Tennessee. ETTP is currently undergoing decontamination and decommissioning to support reuse by the private sector. The DOE initiated a re-industrialization program in 1996, forming the Community Reuse Organization of East Tennessee (CROET) to provide a means of leasing unused facilities at ETTP to private sector businesses. In 2003 under a changed policy direction, DOE implemented an Accelerated Cleanup Plan to remediate ETTP, as many of the buildings are contaminated with radiological constituents (including enriched uranium) and a variety of hazardous substances. In anticipation of transition of the site to a private sector industrial park and to support a nearby residential development, the City of Oak Ridge has taken title to the fire station and a portion of the utilities on site. Acquisition of the water and wastewater utilities by the city has been challenging. The city has embarked on a three-phase process that will enable it to provide electricity to the site and take ownership of on-site electric utilities. Title transfers of potentially contaminated property require an Environmental Baseline Survey and a Covenant Deferral. Two businesses that lease facilities from CROET desire to own the lightly contaminated buildings that they occupy. To date DOE has not enabled these transfers to take place due to indemnification questions and what company options are regarding the remnant contamination. There is significant potential for heritage tourism attractions at ETTP, including a railway station museum and commemoration of the U-shaped K-25 building. DOE is part of International Atomic Energy Agency's (IAEA) International Decommissioning Network. The site's successes are models for re-utilization of nuclear facilities elsewhere in the world. The 'lessons learned' at ETTP enhance IAEA's understanding of the difficulties encountered as nuclear

  20. Site characterization summary report for dry weather surface water sampling upper East Fork Poplar Creek characterization area Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    This report describes activities associated with conducting dry weather surface water sampling of Upper East Fork Poplar Creek (UEFPC) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. This activity is a portion of the work to be performed at UEFPC Operable Unit (OU) 1 [now known as the UEFPC Characterization Area (CA)], as described in the RCRA Facility Investigation Plan for Group 4 at the Oak- Ridge Y-12 Plant, Oak Ridge, Tennessee and in the Response to Comments and Recommendations on RCRA Facility Investigation Plan for Group 4 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, Volume 1, Operable Unit 1. Because these documents contained sensitive information, they were labeled as unclassified controlled nuclear information and as such are not readily available for public review. To address this issue the U.S. Department of Energy (DOE) published an unclassified, nonsensitive version of the initial plan, text and appendixes, of this Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) Plan in early 1994. These documents describe a program for collecting four rounds of wet weather and dry weather surface water samples and one round of sediment samples from UEFPC. They provide the strategy for the overall sample collection program including dry weather sampling, wet weather sampling, and sediment sampling. Figure 1.1 is a schematic flowchart of the overall sampling strategy and other associated activities. A Quality Assurance Project Plan (QAPJP) was prepared to specifically address four rounds of dry weather surface water sampling and one round of sediment sampling. For a variety of reasons, sediment sampling has not been conducted and has been deferred to the UEFPC CA Remedial Investigation (RI), as has wet weather sampling.

  1. Urban and community forests of the South Central East region: Alabama, Kentucky, Mississippi, Tennessee

    Science.gov (United States)

    David J. Nowak; Eric J. Greenfield

    2010-01-01

    This report details how land cover and urbanization vary within the states of Alabama, Kentucky, Mississippi, and Tennessee by community (incorporated and census designated places), county subdivision, and county. Specifically this report provides critical urban and community forestry information for each state including human population characteristics and trends,...

  2. Historical Artifact Collection at the East Tennessee Technology Park

    International Nuclear Information System (INIS)

    Goodpasture, S.T.; Wood, S.K.

    2009-01-01

    The East Tennessee Technology Park (ETTP) was originally built during World War II as part of the Manhattan Project. Known as the K-25 Site, its primary mission was to enrich uranium for use in atomic weapons. During the Cold War, the site's mission was changed to include the enrichment of uranium for nuclear reactor fuel elements and to recycle spent fuel. In the 1980's, a reduction in the demand for nuclear fuel resulted in the shutdown of the enrichment process and production ceased. The emphasis of the mission for the ETTP was then changed to environmental management and restoration operation. Beginning in the 1990's, re-industrialization (conversion of under-utilized government facilities for use by the private sector) became a major mission at the ETTP. These activities involve cleaning and demolishing facilities. Decommission and demolition (D and D) of facilities at the ETTP or Manhattan Project K-25 Gaseous Diffusion Plant on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) presented significant challenges complying with the requirements of the National Historic Preservation Act (NHPA) Memorandum of Agreement (MOA) that was negotiated with the stakeholders. Development of a process to identify, record and preserve the artifacts and the cooperation of several agencies and contractors were critical to completing the collection of the artifacts without impacting the D and D project schedule. Additional challenges included contaminated and classified artifacts, entry to facilities with hazardous conditions, schedule pressures and funding for collection and permanent storage. A process was developed to achieve compliance with the requirements of the NHPA. The NHPA requirements and implementing instruments at the ETTP as well as the process developed to preserve significant Manhattan Project era artifacts at the ETTP will be discussed. Implementation of the artifact collection process is also summarized. The challenge of complying with the

  3. 77 FR 32982 - Notice of Inventory Completion: Tennessee Valley Authority and the University of Tennessee...

    Science.gov (United States)

    2012-06-04

    ..., University of Tennessee Press, Knoxville, TN. Since excavation, the human remains and associated funerary... DEPARTMENT OF THE INTERIOR National Park Service [NPS-WASO-NAGPRA-10270; 2200-1100-665] Notice of Inventory Completion: Tennessee Valley Authority and the University of Tennessee McClung Museum, Knoxville...

  4. Plutonium in biota from an east Tennessee floodplain forest

    International Nuclear Information System (INIS)

    Garten, C.T. Jr.; Dahlman, R.C.

    1978-01-01

    239 240 Pu concentrations were measured in biota from a 30-year-old contaminated floodplain forest in Tennessee. Concentration ratios relative to soil, for plutonium in litter, invertebrate cryptozoans, herbaceous ground vegetation, orthoptera and small mammals were approximately 10 -1 , 10 -2 , 10 -3 , and 10 -4 , respectively. Concentration ratios (CR) for plutonium in biota from the floodplain forest are less than CR values from other contaminated ecosystems in the USA. Presumably, this is due to humid conditions and greater rainfall which minimize resuspension as a physical transport mechanism to biota. Plutonium and radiocesium concentrations are correlated in biota from the forest at Oak Ridge and also from Mortandad Canyon in New Mexico. The cause of the covariance between concentrations of these elements is unknown. Nevertheless, the existence of these relationships suggests that it is possible to predict plutonium in biota from radiocesium concentrations when both nuclides have a common origin and occur together in a contaminated terrestrial environment. (author)

  5. Residential Energy Efficiency Potential: Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, Eric J [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-11-02

    Energy used by Tennessee single-family homes that can be saved through cost-effective improvements. Prepared by Eric Wilson and Noel Merket, NREL, and Erin Boyd, U.S. Department of Energy Office of Energy Policy and Systems Analysis.

  6. Environmental Cleanup of the East Tennessee Technology Park Year One - Execution with Certainty SM - 13120

    Energy Technology Data Exchange (ETDEWEB)

    Schubert, A.L. [URS - CH2M Oak Ridge LLC, P.O. Box 4699, Oak Ridge, TN 37831-7294 (United States)

    2013-07-01

    On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation in Tennessee. UCOR will close out cleanup operations that began in 1998 under a previous contract. When the Contract Base scope of work [1] is completed in 2016, the K-25 gaseous diffusion building will have been demolished and all waste dispositioned, demolition will have started on the K-27 gaseous diffusion building, all contact-handled and remote-handled transuranic waste in inventory (approximately 500 cubic meters) will have been transferred to the Transuranic Waste Processing Center, previously designated 'No-Path-To-Disposition Waste' will have been dispositioned to the extent possible, and UCOR will have managed DOE Office of Environmental Management (EM)- owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and the Y-12 National Security Complex in a safe and cost-effective manner. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; advanced the deactivation and demolition (D and D) of the K-25 gaseous diffusion building; recovered and completed the Tank W-1A and K-1070-B Burial Ground remediation projects; characterized, packaged, and shipped contact-handled transuranic waste to the Transuranic Waste Processing Center; disposed of more than 90,000 cubic yards of cleanup waste while managing the Environmental Management Waste Management Facility (EMWMF); and provided operations, surveillance, and maintenance activities at DOE EM facilities at ETTP, ORNL, and the Y-12 National Security Complex. Project performance as of December 31, 2012 has been excellent: - Cost Performance Index - 1.06; - Schedule Performance Index - 1.02. At the same time, since safety is the foundation of

  7. Tennessee Valley Authority becomes first to install digital process protection system

    International Nuclear Information System (INIS)

    Miller, W.; Doyle, J.

    1991-01-01

    Westinghouse Pressurized Water Reactors were originally furnished with analog process protection equipment of various vintages. The older equipment is quickly reaching the point of obsolescence, becoming costly to maintain and operate, its qualification increasingly difficult to achieve. Newer digital-based systems offer improved performance, automatic calibration, and streamlined surveillance test features, as discussed here. For these reasons, the Tennessee Valley Authority installed the world's first digital process protection system, complete with automatic test and calibration features, in its Sequoyah units 1 and 2 last year. The US utility replaced its ageing analog system with Westinghouse Electric's Eagle 21 Process Protection System during a routine maintenance shutdown in a record 23 days. (author)

  8. Antinuclear movement in Middle Tennessee

    International Nuclear Information System (INIS)

    Dwyer, L.E.

    1977-01-01

    This is a social anthropological analysis of the antinuclear movement in Middle Tennessee. This social movement was determined to halt the construction of proposed nuclear power plants in Tennessee, especially one the Tennessee Valley Authority (TVA) intended to build in Middle Tennessee. The data for the study were gathered by participant-observation interviewing, and the examination of documents from February 1973 through March 1975. The treatment of the data is based on transactional analysis and portions of the network model. This social movement was composed of a series of informally organized cells connected by a loose network of people who visited and talked with one another. Individual cells tended to be organized on a geographical basis, as was communication. Activity-initiators, however, often contacted antinuclear personnel in other Middle Tennessee cells. Movement activity for many of the antinuclear activists was short-lived. The strategic maneuvers of the movement utilized all the structurally and legally possible alternatives and the nuclear opponents hoped that the public would pressure public officials to oppose nuclear plants. Although the antinuclear activists worked very hard, they did not succeed in halting the planned construction of the Middle Tennessee nuclear plant. Indeed, they had not succeeded in the summer of 1977

  9. Public-supply water use and self-supplied industrial water use in Tennessee, 2010

    Science.gov (United States)

    Robinson, John A.

    2018-04-26

    The U.S. Geological Survey (USGS), in cooperation with the Tennessee Department of Environment and Conservation, Division of Water Resources, prepared this report and displayed and analyzed water use by self-supplied industrial and public-supply water systems in Tennessee for 2010. Public-supply water systems in Tennessee provide water for domestic, industrial, and commercial uses and for municipal services. In 2010, 474 public-supply water systems distributed 917 million gallons per day (Mgal/d) of surface water (67 percent, 617 Mgal/d) and groundwater (33 percent, 300 Mgal/d) to a population of 5.7 million in Tennessee. Gross per capita water use in Tennessee during 2010 was 162 gallons per day.Since 1950, water withdrawals by public-supply water systems in Tennessee have increased from 160 Mgal/d to 917 Mgal/d in 2010. Each of the 95 counties in Tennessee was served by at least 1 public-supply water system in 2010. Tennessee public-supply water systems withdraw less groundwater than surface water, and surface-water use has increased at a faster rate than groundwater use. Since 2005, surface-water withdrawals have increased by 26 Mgal/d, and groundwater withdrawals have decreased by 29 Mgal/d, which is the first decrease in groundwater withdrawals since 1950; however, 29 systems reported increased groundwater withdrawals during 2010, and 12 of these 29 systems reported increases of 1 Mgal/d or more. Davidson County had the largest surface-water withdrawal rate (136 Mgal/d) in 2010. The largest groundwater withdrawal rate (151 Mgal/d) by a single public-supply water system was reported by Memphis Light, Gas and Water, which served more than 669,000 people in Shelby County in 2010.Self-supplied industrial water use includes water for such purposes as fabrication, processing, washing, diluting, cooling, or transporting a product; incorporating water into a product; or for sanitation needs in facilities that manufacture various products. Water withdrawals for self

  10. Tennessee Promise: A Response to Organizational Change

    Science.gov (United States)

    Littlepage, Ben; Clark, Teresa; Wilson, Randal; Stout, Logan

    2018-01-01

    Community colleges in Tennessee, either directly or indirectly, experienced unprecedented change as a result of Tennessee Promise. The present study explored how student support service administrators at three community colleges responded to organizational change as a result of the Tennessee Promise legislation. Investigators selected community…

  11. State Education Finance and Governance Profile: Tennessee

    Science.gov (United States)

    Krause, Mike

    2010-01-01

    This article presents the state education finance and governance profile of Tennessee. The 17th largest state, Tennessee is home to 2.01% of the nation's inhabitants. Funding of K-12 education in Tennessee is accomplished via a formula known as the Basic Educational Program (BEP). This plan primarily utilizes school district enrollment numbers to…

  12. Remedial design work plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-02-01

    The Remedial Design Work Plan (RDWP) for the Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee, has been prepared. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative, as stated in the Record of Decision (ROD) was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Thereafter, a public hearing was held to review the proposed plan. Comments were incorporated. The revised selected remedy, per the ROD is to excavate and dispose of floodplain soils contaminated above the remediation goal of 400 parts per million mercury. The approved ROD with this goal will be the basis for remedial design (RD). The RD work plan (RDWP) is composed of six chapters. An introductory chapter describes the purpose and scope of the RDWP, the selected remedy as identified by the ROD; the roles and responsibilities of the RD team members, and the site background information, including site history, contaminants of concern, and site characteristics. Chapter 2 contains the design objectives, RD approach, regulatory considerations during RD, and the design criteria with assumptions. Chapter 3 presents the RD planning process to prepare this RDWP, as well as secondary RD support plans. Chapter 4 describes the scope of the RD activities in more detail and identifies what will be included in the design package. Chapter 5 presents the schedule for performance of the RD activities, identifying key RD milestones. Specific documents used in the preparation of this document are referenced in Chapter 6

  13. Recovery Act: Tennessee Energy Efficient Schools Initiative Ground Source Heat Pump Program

    Energy Technology Data Exchange (ETDEWEB)

    Townsend, Terry [Townsend Engineering, Inc., Davenport, IA (United States); Slusher, Scott [Townsend Engineering, Inc., Davenport, IA (United States)

    2017-04-24

    The Tennessee Energy Efficient Schools Initiative (EESI) Hybrid-Water Source Heat Pump (HY-GSHP) Program sought to provide installation costs and operation costs for different Hybrid water source heat pump systems’ configurations so that other State of Tennessee School Districts will have a resource for comparison purposes if considering a geothermal system.

  14. The first-step of EAST remote participation system

    Energy Technology Data Exchange (ETDEWEB)

    Sun, Xiaoyang, E-mail: xysun@ipp.ac.cn; Ji, Zhenshan; Wang, Feng; Li, Shi; Wang, Yong

    2016-11-15

    Highlights: • A new design for remote participation system for EAST tokamak is proposed. • Rich Internet Application (RIA) and NoSQL Database was select to implement the system. • Two kind of technique for accessing EPICS PV data remotely through Internet was proposed. - Abstract: The EAST Tokamak at Institute of Plasma Physics Chinese Academy of Sciences (CASIPP) is the first fully-superconducting Tokamak facility. International collaboration can improve the quality and impact of fusion research. It is a key feature for EAST research. During 2014 EAST campaign, more than 60 physicists and experts visited CASIPP and participated in EAST discharging experiment. With an increasing number of collaborations, remote participation becomes important as an economical and effective alternative to traditional way. This paper presents an overview of the first-step development work of the EAST Remote Participation System (EAST RPS). At current stage, the EAST RPS is focused on remote access to engineering data, NoSQL-based data archiving engine, message service and video service.

  15. The first-step of EAST remote participation system

    International Nuclear Information System (INIS)

    Sun, Xiaoyang; Ji, Zhenshan; Wang, Feng; Li, Shi; Wang, Yong

    2016-01-01

    Highlights: • A new design for remote participation system for EAST tokamak is proposed. • Rich Internet Application (RIA) and NoSQL Database was select to implement the system. • Two kind of technique for accessing EPICS PV data remotely through Internet was proposed. - Abstract: The EAST Tokamak at Institute of Plasma Physics Chinese Academy of Sciences (CASIPP) is the first fully-superconducting Tokamak facility. International collaboration can improve the quality and impact of fusion research. It is a key feature for EAST research. During 2014 EAST campaign, more than 60 physicists and experts visited CASIPP and participated in EAST discharging experiment. With an increasing number of collaborations, remote participation becomes important as an economical and effective alternative to traditional way. This paper presents an overview of the first-step development work of the EAST Remote Participation System (EAST RPS). At current stage, the EAST RPS is focused on remote access to engineering data, NoSQL-based data archiving engine, message service and video service.

  16. Data monitoring system of technical diagnosis system for EAST

    International Nuclear Information System (INIS)

    Qian Jing; Weng Peide; Chen Zhuomin; Wu Yu; Xi Weibin; Luo Jiarong

    2010-01-01

    Technical diagnosis system (TDS) is an important subsystem to monitor status parameters of EAST (experimental advanced superconducting tokamak). The upgraded TDS data monitoring system is comprised of management floor, monitoring floor and field floor.. Security protection, malfunction record and analysis are designed to make the system stable, robust and friendly. During the past EAST campaigns, the data monitoring system has been operated reliably and stably. The signal conditioning system and software architecture are described. (authors)

  17. Adjustment of regional regression models of urban-runoff quality using data for Chattanooga, Knoxville, and Nashville, Tennessee

    Science.gov (United States)

    Hoos, Anne B.; Patel, Anant R.

    1996-01-01

    Model-adjustment procedures were applied to the combined data bases of storm-runoff quality for Chattanooga, Knoxville, and Nashville, Tennessee, to improve predictive accuracy for storm-runoff quality for urban watersheds in these three cities and throughout Middle and East Tennessee. Data for 45 storms at 15 different sites (five sites in each city) constitute the data base. Comparison of observed values of storm-runoff load and event-mean concentration to the predicted values from the regional regression models for 10 constituents shows prediction errors, as large as 806,000 percent. Model-adjustment procedures, which combine the regional model predictions with local data, are applied to improve predictive accuracy. Standard error of estimate after model adjustment ranges from 67 to 322 percent. Calibration results may be biased due to sampling error in the Tennessee data base. The relatively large values of standard error of estimate for some of the constituent models, although representing significant reduction (at least 50 percent) in prediction error compared to estimation with unadjusted regional models, may be unacceptable for some applications. The user may wish to collect additional local data for these constituents and repeat the analysis, or calibrate an independent local regression model.

  18. The effect of location and facility demand on the marginal cost of delivered wood chips from energy crops: A case study of the state of Tennessee

    International Nuclear Information System (INIS)

    Graham, R.L.; Liu, W.; Downing, M.; Noon, C.; Daly, M.; Moore, A.

    1995-01-01

    Cost-supply curves for delivered wood chips from short rotation woody crops were calculated for 21 regularly-spaced locations spanning the state of Tennessee. These curves were used to systematically evaluate the combined effects of location and facility demand on wood chip feedstock costs in Tennessee. The cost-supply curves were developed using BRAVO, a GIS-based decision support system which calculates marginal cost of delivering wood chips to a specific location given road network maps and maps of farmgate prices and supplies of woody chips from short rotation energy crops. Marginal costs of delivered chips varied by both facility location in the state and facility demand. Marginal costs were lowest in central Tennessee unless the facility demand was greater than 2.7 million dry Mg per year (3 million dry tons per year) in which case west Tennessee was the lowest cost region. Marginal costs rose rapidly with increasing facility demand in the mountainous eastern portion of the state. Transportation costs accounted for 18 to 29% of the delivered cost and ranged between $8 and $18/dry Mg ($7 and $16/dry ton). Reducing the expected farmer participation rate from 100% to 50% or 25% dramatically raised the marginal costs of feedstock supply in the east and central regions of the state. The analysis demonstrates the need to use geographically-specific information when projecting the potential costs and supplies of biomass feedstock

  19. Breathing Life into Business Concepts: Utilizing Simulations in Management Information Systems

    Science.gov (United States)

    Hendrix, Stephen

    2016-01-01

    The Department of Computing at East Tennessee State University provides students exposure to the enterprise application SAP as a part of the Information Systems curriculum. Over the past two years, the use of SAP has expanded beyond the Department of Computing into the Management Information Systems course offered by the Department of Management…

  20. Bedrock geology and mineral resources of the Knoxville 1° x 2° quadrangle, Tennessee, North Carolina, and South Carolina

    Science.gov (United States)

    Robinson, Gilpin R.; Lesure, Frank G.; Marlowe, J. I.; Foley, Nora K.; Clark, S.H.

    2004-01-01

    The Knoxville 1°x 2° quadrangle spans the Southern Blue Ridge physiographic province at its widest point from eastern Tennessee across western North Carolina to the northwest corner of South Carolina. The quadrangle also contains small parts of the Valley and Ridge province in Tennessee and the Piedmont province in North and South Carolina. Bedrock in the Valley and Ridge consists of unmetamorphosed, folded and thrust-faulted Paleozoic miogeoclinal sedimentary rocks ranging in age from Cambrian to Mississippian. The Blue Ridge is a complex of stacked thrust sheets divided into three parts: (1) a west flank underlain by rocks of the Late Proterozoic and Early Cambrian Chilhowee Group and slightly metamorphosed Late Proterozoic Ocoee Supergroup west of the Greenbrier fault; (2) a central part containing crystalline basement of Middle Proterozoic age (Grenville), Ocoee Supergroup rocks east of the Greenbrier fault, and rocks of the Murphy belt; and (3) an east flank containing the Helen, Tallulah Falls, and Richard Russell thrust sheets and the amphibolitic basement complex. All of the east flank thrust sheets contain polydeformed and metamorphosed sedimentary and igneous rocks of mostly Proterozoic age. The Blue Ridge is separated by the Brevard fault zone from a large area of rocks of the Inner Piedmont to the east, which contains the Six Mile thrust sheet and the ChaugaWalhalla thrust complex. All of these rocks are also polydeformed and metamorphosed sedimentary and igneous rocks. The Inner Piedmont rocks in this area occupy both the Piedmont and part of the Blue Ridge physiographic provinces.

  1. The cryogenic control system of EAST

    International Nuclear Information System (INIS)

    Zhuang, M.; Hu, L.B.; Zhow, Z.W.; Xia, G.H.

    2012-01-01

    Highlights: ► A reliable and flexible duplex control system is required for cryogenic system. ► The cryogenic control system is based on Delta-V DCS. ► It has been proved to be an effective way to control cryogenic process. ► It will provide useful experience and inspiration for the development in the cryogenic control engineering. - Abstract: A large scale helium cryogenic system is one of the key components for the EAST tokamak device for the cooling of PF and TF coils, structures, thermal shields, buslines, current leads and cryopumps. Since the cooling scheme of the EAST cryogenic system is fairly complicated, a reliable and flexible control system is required for cryogenic system. The cryogenic control system is based on DeltaV DCS which is the process control software developed by Emerson Company. The EAST cryogenic system has been in operation for four years and has been proved to be safe, stable and energy saving by the past 7 experiments. This paper describes the redundant control network, hardware configuration, software structure, auxiliary system and the new development in the future.

  2. Tennessee Comptroller of the Treasury (TN COMP)

    Data.gov (United States)

    Social Security Administration — The Tennessee Comptroller of the Treasury (TN COMP) uses SSA's assistance in administering the Tennessee Property Tax Rebate Program. SSA provides assistance through...

  3. EAST ICRF system for long pulse operation

    International Nuclear Information System (INIS)

    Zhao, Y.P.; Zhang, X.J.; Mao, Y.Z.

    2013-01-01

    Radio frequency (RF) power in the ion cyclotron range of frequencies (ICRF) is one of the primary auxiliary heating techniques for Experimental Advanced Superconducting Tokamak (EAST). A 6.0 MW ICRF systems in the range of 25-70 MHz has been put into operation during the EAST 2012 spring campaign. The ICRF systems consist of two port-mounted antennas and each antenna is driven by two independent 1.5 MW RF power source. Another four 1.5 MW ICRF system is under way of construction.The system will deliver more than 10 MW of RF power to the plasma for 1000 sec pulse length. This paper gives brief introduction of the ICRF systems capability on EAST. (author)

  4. Transportation impacts on the Tennessee highway system proposed monitored retrievable storage

    Energy Technology Data Exchange (ETDEWEB)

    Cobble, C.

    1985-12-12

    The issue of the transport of spent fuels to the proposed monitored retrievable storage facility in Tennessee is discussed. Relevant issues include the ability of the roads and bridges on the transport routes to handle the weight of the trucks. (CBS)

  5. Innovations in nuclear engineering distance education at the University of Tennessee

    International Nuclear Information System (INIS)

    Miller, L.; Pevey, R.; Hines, W.; Townsend, L.; Upadhyaya, B.; Groer, P.; Grossbeck, M.; Dodds, H.

    2006-01-01

    The Univ. of Tennessee Dept. of Nuclear Engineering (UTNE) offers both graduate and undergraduate internet-based courses that support a Master of Science (MS) degree and several certificate programs. In particular a MS degree can be conveniently obtained through distance classes. In addition certificates in Nuclear Criticality Safety and in Maintenance and Reliability can be obtained by completing a subset of courses offered for the MS degree. Students enrolled in these courses are predominately located in East Tennessee, but many live throughout the United States and in several foreign countries. An innovation of significant benefit to the UTNE undergraduate program is the implementation of reactor and laboratory experiments that are conducted over the Internet on the PULSTAR reactor at North Carolina State Univ. (NCSU). These experiments are conducted live with video, audio, and data transmission, and to date experiments involving approach to critical, rod calibration using incremental and inverse kinetics methods, thermal calibration of neutron detectors, and reactivity coefficients have been conducted. Neutron scattering experiments are planned for remote control by students. The use of internet-based education has enhanced the undergraduate program at the UTNE, and it has created opportunities for students with Internet access to obtain a quality education in Nuclear Engineering. (authors)

  6. Chronic Absenteeism in Tennessee's Early Grades

    Science.gov (United States)

    Attridge, Jonathon

    2016-01-01

    Although the average daily attendance rate for Tennessee students is 95 percent, almost 45,000, or 10 percent, of Tennessee K-3 students missed at least a month's worth of school days during the 2014-15 school year. These "chronically absent" students present a particular problem for schools that are charged with developing foundational…

  7. Real-time virtual EAST physical experiment system

    Energy Technology Data Exchange (ETDEWEB)

    Li, Dan, E-mail: lidan@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Xiao, B.J., E-mail: bjxiao@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); School of Nuclear Science and Technology, University of Science and Technology of China, Hefei, Anhui (China); Xia, J.Y., E-mail: jyxia@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Yang, Fei, E-mail: fyang@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Department of Computer Science, Anhui Medical University, Hefei, Anhui (China)

    2014-05-15

    Graphical abstract: - Highlights: • 3D model of experimental advanced superconducting tokamak is established. • Interaction behavior is created that the users can get information from database. • The system integrates data acquisition, plasma shape visualization and simulation. • Browser-oriented system is web-based and more interactive, immersive and convenient. • The system provides the framework for virtual physical experimental environment. - Abstract: As a large fusion reaction device, experimental advanced superconducting tokamak (EAST)’s internal structure is complicated and not easily accessible. Moreover, various diagnostic systems and complicated configuration bring about the inconveniency to the scientists who are unfamiliar with the system but interested in the data. We propose a virtual system to display the 3D model of EAST facility and enable people to view its inner structure and get access to the information of its components in various view sights. We would also provide most of the diagnostic configuration details together with their signal names and physical properties. Compared to the previous ways of viewing information by reference to collected drawings and videos, virtual EAST system is more interactive and immersive. We constructed the browser-oriented virtual EAST physical experiment system, integrated real-time experiment data acquisition, plasma shape visualization and experiment result simulation in order to reproduce physical experiments in a web browser. This system used B/S (Browser/Server) structure in combination with the technology of virtual reality – VRML (Virtual Reality Modeling Language) and Java 3D. In order to avoid the bandwidth limit across internet, we balanced the rendering speed and the precision of the virtual model components. Any registered user can view the experimental information visually and efficiently by logining the system through a web browser. The establishment of the system provides the

  8. Real-time virtual EAST physical experiment system

    International Nuclear Information System (INIS)

    Li, Dan; Xiao, B.J.; Xia, J.Y.; Yang, Fei

    2014-01-01

    Graphical abstract: - Highlights: • 3D model of experimental advanced superconducting tokamak is established. • Interaction behavior is created that the users can get information from database. • The system integrates data acquisition, plasma shape visualization and simulation. • Browser-oriented system is web-based and more interactive, immersive and convenient. • The system provides the framework for virtual physical experimental environment. - Abstract: As a large fusion reaction device, experimental advanced superconducting tokamak (EAST)’s internal structure is complicated and not easily accessible. Moreover, various diagnostic systems and complicated configuration bring about the inconveniency to the scientists who are unfamiliar with the system but interested in the data. We propose a virtual system to display the 3D model of EAST facility and enable people to view its inner structure and get access to the information of its components in various view sights. We would also provide most of the diagnostic configuration details together with their signal names and physical properties. Compared to the previous ways of viewing information by reference to collected drawings and videos, virtual EAST system is more interactive and immersive. We constructed the browser-oriented virtual EAST physical experiment system, integrated real-time experiment data acquisition, plasma shape visualization and experiment result simulation in order to reproduce physical experiments in a web browser. This system used B/S (Browser/Server) structure in combination with the technology of virtual reality – VRML (Virtual Reality Modeling Language) and Java 3D. In order to avoid the bandwidth limit across internet, we balanced the rendering speed and the precision of the virtual model components. Any registered user can view the experimental information visually and efficiently by logining the system through a web browser. The establishment of the system provides the

  9. An Assessment of Future Demands for and Benefits of Public Transit Srevices in Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Southworth, F.

    2004-04-29

    This report documents results from a study carried out by Oak Ridge National Laboratory and the University of Tennessee at Knoxville for the Office of Public Transportation, Tennessee Department of Transportation. The study team was tasked with developing a process and a supporting methodology for estimating the benefits accruing to the State from the operation of state supported public transit services. The team was also tasked with developing forecasts of the future demands for these State supported transit services at five year intervals through the year 2020, broken down where possible to the local transit system level. Separate ridership benefits and forecasts were also requested for the State's urban and rural transit operations. Tennessee's public transit systems are subsidized to a degree by taxpayers. It is therefore in the public interest that assessments of the benefits of such systems be carried out at intervals, to determine how they are contributing to the well-being of the state's population. For some population groups within the State of Tennessee these transit services have become essential as a means of gaining access to workplaces and job training centers, to educational and health care facilities, as well as to shops, social functions and recreational sites.

  10. An Assessment of Future Demands for and Benefits of Public Transit Services in Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Southworth, F.

    2003-06-10

    This report documents results from a study carried out by Oak Ridge National Laboratory and the University of Tennessee at Knoxville for the Office of Public Transportation, Tennessee Department of Transportation. The study team was tasked with developing a process and a supporting methodology for estimating the benefits accruing to the State from the operation of state supported public transit services. The team was also tasked with developing forecasts of the future demands for these State supported transit services at five year intervals through the year 2020, broken down where possible to the local transit system level. Separate ridership benefits and forecasts were also requested for the State's urban and rural transit operations. Tennessee's public transit systems are subsidized to a degree by taxpayers. It is therefore in the public interest that assessments of the benefits of such systems be carried out at intervals, to determine how they are contributing to the well-being of the state's population. For some population groups within the State of Tennessee these transit services have become essential as a means of gaining access to workplaces and job training centers, to educational and health care facilities, as well as to shops, social functions and recreational sites.

  11. The NASA Earth Observing System Higher-Education Alliance Curriculum Development Project at Middle Tennessee State University

    Science.gov (United States)

    Abolins, M. J.; Wylie, M.

    2008-12-01

    During the last three years, geodata-rich undergraduate curricula were developed at Middle Tennessee State University (MTSU) with major support from the NASA Earth Observing System Higher-Education Alliance ("GeoBrain") and additional support from Tennessee Space Grant and the NSF StepMT program. These curricula fall into three broad categories: (1) GIS-based curricula, (2) the free on-line textbook "Physical Regions and Features of the United States," and (3) presentation graphics (primarily satellite images) for faculty involved in teaching and research outside the United States. All three incorporate Earth Observing System data as well as data from other public sources. Most data was obtained through the GeoBrain data download website, the USGS Seamless Data Distribution System, or the National Atlas of the United States website. The three categories of curricula exemplify the diverse educational applications of satellite images and other map data. The GIS-based curricula (1) are built around ESRI GIS software and include an asteroid impact activity and a volcano activity. The free on-line textbook (2) provides a broad overview of the physical features of the United States and is intended as a supplement for undergraduate geoscience courses. Presentation graphics (3) have been created for faculty investigating Scottish archeology and historical/cultural issues in Portugal and Morocco. The three categories represent three distinctly different ways to use remotely-sensed data to improve undergraduate instruction.

  12. Fourth Tennessee water resources symposium

    International Nuclear Information System (INIS)

    Sale, M.J.; Presley, P.M.

    1991-01-01

    The annual Tennessee Water Resources Symposium was initiated in 1988 as a means to bring together people with common interests in the state's important water-related resources at a technical, professional level. Initially the symposium was sponsored by the American Institute of Hydrology and called the Hydrology Symposium, but the Tennessee Section of the American Water Resources Association (AWRA) has taken on the primary coordination role for the symposium over the last two years and the symposium name was changed in 1990 to water resources to emphasize a more inter-disciplinary theme. This year's symposium carries on the successful tradition of the last three years. Our goal is to promote communication and cooperation among Tennessee's water resources professionals: scientists, engineers, and researchers from federal, state, academic, and private institutions and organizations who have interests and responsibilities for the state's water resources. For these conference proceedings, individual papers are processed separately for the Energy Data Base

  13. Tennessee Eastman Plant-wide Industrial Process Challenge Problem

    DEFF Research Database (Denmark)

    Sales-Cruz, Mauricio; Cameron, Ian; Gani, Rafiqul

    2011-01-01

    This chapter presents a comprehensive analysis and modelling of the Tennessee Eastman challenge problem. Both a simplified model of the system as well as a full process model that includes the energy balances is given. In each case a full model analysis is carried out to establish the degrees...

  14. Green Jobs in Tennessee: Economic Impact of Green Investments

    OpenAIRE

    Murat Arik

    2011-01-01

    The term green jobs has been widely used to describe jobs in businesses that are particularly related to renewable energy, energy efficiency, or environmental sustainability. The Business and Economic Research Center has partnered with the Tennessee Department of Labor and Workforce Development to estimate the economic impact of six ground-breaking green investments in Tennessee: Hemlock Semiconductor, Wacker Chemie AG, Volkswagen, Nissan Leaf and Storage Battery Manufacturing, Tennessee Sola...

  15. Mitigation of Hexavalent Chromium in Storm Water Resulting from Demolition of Large Concrete Structure at the East Tennessee Technology Park - 12286

    Energy Technology Data Exchange (ETDEWEB)

    Britto, Ronnie; Brown, Bridget; Hale, Timothy B.; Hensley, Janice L.; Johnson, Robert T.; Patel, Madhu [Tetra Tech, Inc. (United States); Emery, Jerry A. [Energy Solutions, Inc. (United States); Gaston, Clyde [LATA-SHARP Remediation Services - LSRS (United States); Queen, David C. [U.S. DOE-ORO (United States)

    2012-07-01

    American Recovery and Reinvestment Act (ARRA) funding was provided to supplement the environmental management program at several DOE sites, including the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Demolition of the ETTP K-33 Building, the largest building to be demolished to date in Oak Ridge, was awarded to LSRS in FY-2010 under the ARRA program. The K-33 building was an 82 foot tall 2-story structure covering approximately 32 acres. Once this massive building was brought down to the ground, the debris was segregated and consolidated into piles of concrete rubble and steel across the remaining pad. The process of demolishing the building, tracking across concrete debris with heavy equipment, and stockpiling the concrete rubble caused it to become pulverized. During and after storm events, hexavalent chromium leached from the residual cement present in the large quantities of concrete. Storm water control measures were present to preclude migration of contaminants off-site, but these control measures were not designed to control hexavalent chromium dissolved in storm water from reaching nearby receiving water. The following was implemented to mitigate hexavalent chromium in storm water: - Steel wool was distributed around K-33 site catch basins and in water pools as an initial step in addressing hexavalent chromium. - Since the piles of concrete were too massive and unsafe to tarp, they were placed into windrows in an effort to reduce total surface area. - A Hach colorimetric field meter was acquired by the K-33 project to provide realtime results of hexavalent chromium in site surface water. - Three hexavalent chromium treatment systems were installed at three separate catch basins that receive integrated storm water flow from the K-33 site. Sodium bisulfite is being used as a reducing agent for the immobilization of hexavalent chromium while also assisting in lowering pH. Concentrations initially were 310 - 474 ppb of hexavalent chromium in

  16. Hg isotopes reveal in-stream processing and legacy inputs in East Fork Poplar Creek, Oak Ridge, Tennessee, USA.

    Science.gov (United States)

    Demers, Jason D; Blum, Joel D; Brooks, Scott C; Donovan, Patrick M; Riscassi, Ami L; Miller, Carrie L; Zheng, Wang; Gu, Baohua

    2018-04-25

    Natural abundance stable Hg isotope measurements were used to place new constraints on sources, transport, and transformations of Hg along the flow path of East Fork Poplar Creek (EFPC), a point-source contaminated headwater stream in Oak Ridge, Tennessee. Particulate-bound Hg in the water column of EFPC within the Y-12 National Security Complex, was isotopically similar to average metallic Hg(0) used in industry, having a mean δ202Hg value of -0.42 ± 0.09‰ (1SD) and near-zero Δ199Hg. On average, particulate fraction δ202Hg values increased downstream by 0.53‰, while Δ199Hg decreased by -0.10‰, converging with the Hg isotopic composition of the fine fraction of streambed sediment along the 26 km flow path. The dissolved fraction behaved differently. Although initial Δ199Hg values of the dissolved fraction were also near-zero, these values increased transiently along the flow path. Initial δ202Hg values of the dissolved fraction were more variable than in the particulate fraction, ranging from -0.44 to 0.18‰ among three seasonal sampling campaigns, but converged to an average δ202Hg value of 0.01 ± 0.10‰ (1SD) downstream. Dissolved Hg in the hyporheic and riparian pore water had higher and lower δ202Hg values, respectively, compared to dissolved Hg in stream water. Variations in Hg isotopic composition of the dissolved and suspended fractions along the flow path suggest that: (1) physical processes such as dilution and sedimentation do not fully explain decreases in total mercury concentrations along the flow path; (2) in-stream processes include photochemical reduction, but microbial reduction is likely more dominant; and (3) additional sources of dissolved mercury inputs to EFPC at baseflow during this study predominantly arise from the hyporheic zone.

  17. Evaluation of sinkhole occurrence in the Valley and Ridge Province, East Tennessee: Phase 3

    International Nuclear Information System (INIS)

    Newton, J.G.; Tanner, J.M.

    1987-11-01

    Data from a reconnaissance-type inventory of sinkhole occurrence and from more detailed inventories in selected areas were used to determine regional density and frequency of sinkhole occurrence in the Valley and Ridge Province, Tennessee. The overall database consisted of 333 sinkholes of which 211, or 63 percent of the total, were classified as induced. Almost all induced sinkholes resulted from construction activities, such as grading, ditching, and impoundment of water. Extrapolation of data to provide estimates of regional sinkhole density necessitated adjustment of the reconnaissance inventory. Adjustment factors were calculated by comparing reconnaissance inventories from selected areas with those obtained from detailed inventories in the same areas. The number of sinkholes in the detailed inventories was 5 and 8.5 times greater than the number in the reconnaissance inventories

  18. Three approaches to the classification of inland wetlands. [Dismal Swamp, Tennessee, and Florida

    Science.gov (United States)

    Gammon, P. T.; Malone, D.; Brooks, P. D.; Carter, V.

    1977-01-01

    In the Dismal Swamp project, seasonal, color-infrared aerial photographs and LANDSAT digital data were interpreted for a detailed analysis of the vegetative communities in a large, highly altered wetland. In Western Tennessee, seasonal high altitude color-infrared aerial photographs provided the hydrologic and vegetative information needed to map inland wetlands, using a classification system developed for the Tennessee Valley Region. In Florida, color-infrared aerial photographs were analyzed to produce wetland maps using three existing classification systems to evaluate the information content and mappability of each system. The methods used in each of the three projects can be extended or modified for use in the mapping of inland wetlands in other parts of the United States.

  19. Design demonstrations for category B tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-01

    This document presents design demonstrations conducted of liquid low-level waste (LLLW) storage tank systems located at the Oak Ridge National Laboratory (ORNL). Demonstration of the design of these tank systems has been stipulated by the Federal Facility Agreement (FFA) between the US Environmental Protection Agency (EPA)-Region IV; the Tennessee Department of Environment and Conservation (TDEC); and the DOE. The FFA establishes four categories of tanks. These are: Category A -- New or replacement tank systems with secondary containment; Category B -- Existing tank systems with secondary containment; Category C -- Existing tank systems without secondary containment; Category D -- Existing tank systems without secondary containment that are removed from service. This document provides a design demonstration of the secondary containment and ancillary equipment of 11 tank systems listed in the FFA as Category B. The design demonstration for each tank is presented.

  20. Design demonstrations for category B tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-11-01

    This document presents design demonstrations conducted of liquid low-level waste (LLLW) storage tank systems located at the Oak Ridge National Laboratory (ORNL). Demonstration of the design of these tank systems has been stipulated by the Federal Facility Agreement (FFA) between the US Environmental Protection Agency (EPA)-Region IV; the Tennessee Department of Environment and Conservation (TDEC); and the DOE. The FFA establishes four categories of tanks. These are: Category A -- New or replacement tank systems with secondary containment; Category B -- Existing tank systems with secondary containment; Category C -- Existing tank systems without secondary containment; Category D -- Existing tank systems without secondary containment that are removed from service. This document provides a design demonstration of the secondary containment and ancillary equipment of 11 tank systems listed in the FFA as Category B. The design demonstration for each tank is presented

  1. Assessment of subsidence in karst terranes at selected areas in East Tennessee and comparison with a candidate site at Oak Ridge, Tennessee: Phase 2

    International Nuclear Information System (INIS)

    Newton, J.G.; Tanner, J.M.

    1987-09-01

    Work in the respective areas included assessment of conditions related to sinkhole development. Information collected and assessed involved geology, hydrogeology, land use, lineaments and linear trends, identification of karst features and zones, and inventory of historical sinkhole development and type. Karstification of the candidate, Rhea County, and Morristown study areas, in comparison to other karst areas in Tennessee, can be classified informally as youthful, submature, and mature, respectively. Historical sinkhole development in the more karstified areas is attributed to the greater degree of structural deformation by faulting and fracturing, subsequent solutioning of bedrock, thinness of residuum, and degree of development by man. Sinkhole triggering mechanisms identified are progressive solution of bedrock, water-level fluctuations, piping, and loading. 68 refs., 18 figs., 11 tabs

  2. Implementation plan for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory under the Federal Facility Agreement, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-06-01

    Plans and schedules for meeting the Federal Facility Agreement (FFA) commitments for the Liquid Low-Level Waste (LLLW) System at Oak Ridge National Laboratory (ORNL) were initially submitted in ES/ER-17 ampersand D1, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. The information presented in the current document summarizes the progress that has been made to date and provides a comprehensive summary to facilitate understanding of the FFA compliance program for LLLW tank systems and to present the plans and schedules associated with the remediation, through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process, of LLLW tank systems that have been removed from service. A comprehensive program is under way at ORNL to upgrade the LLLW system as necessary to meet the FFA requirements. The tank systems that are removed from service are being investigated and remediated through the CERCLA process. Waste and risk characterizations have been submitted. Additional data will be submitted to the US Environmental Protection Agency and the Tennessee Department of Environment and Conservation (EPA/TDEC) as tanks are taken out of service and as required by the remedial investigation/feasibility study (RI/FS) process. The plans and schedules for implementing the FFA compliance program that were originally submitted in ES/ER-17 ampersand D 1, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste tanks Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee, are updated in the present document. Chapter I provides general background information and philosophies that lead to the plans and schedules that appear in Chaps. 2 through 5

  3. Transportation impacts on the Tennessee highway system proposed monitored retrievable storage. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Cobble, C.

    1985-12-12

    The issue of the transport of spent fuels to the proposed monitored retrievable storage facility in Tennessee is discussed. Relevant issues include the ability of the roads and bridges on the transport routes to handle the weight of the trucks. (CBS)

  4. Technical diagnosis system for EAST tokamak

    International Nuclear Information System (INIS)

    Qian Jing; Weng, P.D.; Luo, J.R.; Chen, Z.M.; Wu, Y.

    2010-01-01

    Technical diagnosis system (TDS) is one of the important subsystems of EAST (experimental advanced superconducting tokamak) device, main function of which is to monitor status parameters in EAST device. Those status parameters include temperature of different positions of main components, resistance of each superconducting (SC) coils, joint resistance of SC coils and high-temperature superconducting (HTS) current leads, strain of cold-quality components endured force, and displacement and current of toroidal field (TF) coils in EAST device, which are analog input signals. In addition there are still some analog and digital output signals. The TDS monitors all of those signals in the period of EAST experiments. TDS data monitoring is described in detail for it plays important role during EAST campaign. And how to protect the SC magnet system during each plasma discharging is presented with data of temperature of coolant inlet and outlet of SC coils and feeders and cases of the TF coils and temperature in the upper and middle and bottom of the TF coil case. During construction of the TDS primary difficulties come from installation of Lakeshore Cernox temperature sensors, strain measurement of central solenoid coils support legs and installation of co-wound voltage sensors for quench detection. While during operation since the first commissioning big challenges are from temperature measurement changes in current leads and quench detection of PF coils. Those difficulties in both stages are introduced which are key to make the TDS reliable. Meanwhile analysis of experimental data like temperature as a back up to testify quench occurrence and stress on vacuum vessel thermal shield and vacuum vessel have also been discussed.

  5. Digital Learning Compass: Distance Education State Almanac 2017. Tennessee

    Science.gov (United States)

    Seaman, Julia E.; Seaman, Jeff

    2017-01-01

    This brief report uses data collected under the U.S. Department of Education's National Center for Educational Statistics (NCES) Integrated Postsecondary Education Data System (IPEDS) Fall Enrollment survey to highlight distance education data in the state of Tennessee. The sample for this analysis is comprised of all active, degree-granting…

  6. Hatchery-borne Salmonella enterica serovar Tennessee infections in broilers

    DEFF Research Database (Denmark)

    Christensen, J.P.; Brown, D.J.; Madsen, Mogens

    1997-01-01

    . Restriction enzyme analysis of the plasmid ensured that the plasmids from broilers and the hatchery were identical. By analysis of cleaning and disinfection procedures and by sampling of different control points in the hatchery it was shown that S. enterica ser. Tennessee had colonized areas of the hatchers...... which were protected from routine cleaning and disinfection. Subsequent inclusion of these areas into the sanitation programme resulted in the elimination of S. enterica ser. Tennessee from the hatchers, and a decreasing prevalence of S. enterica ser. Tennessee was observed in broiler flocks during...

  7. Transportable Vitrification System Demonstration on Mixed Waste

    International Nuclear Information System (INIS)

    Zamecnik, J.R.; Whitehouse, J.C.; Wilson, C.N.; Van Ryn, F.R.

    1998-01-01

    This paper describes preliminary results from the first demonstration of the Transportable Vitrification System (TVS) on actual mixed waste. The TVS is a fully integrated, transportable system for the treatment of mixed and low-level radioactive wastes. The demonstration was conducted at Oak Ridge's East Tennessee Technology Park (ETTP), formerly known as the K-25 site. The purpose of the demonstration was to show that mixed wastes could be vitrified safely on a 'field' scale using joule-heated melter technology and obtain information on system performance, waste form durability, air emissions, and costs

  8. The implementation of virtualization technology in EAST data system

    International Nuclear Information System (INIS)

    Wang, Feng; Sun, Xiaoyang; Li, Shi; Wang, Yong; Xiao, Bingjia; Chang, Sidi

    2014-01-01

    Highlights: • The server virtualization based on XenServer has been used in EAST data center for common servers and software development platform. • The application virtualization based on XenApp has been demonstrated in EAST to provide an easy and unified data browser method. • The desktop virtualization based on XenDesktop has been adopted for desktop virtualization in the new EAST central control room. - Abstract: The virtualization technology is very popular in many fields at present which has many advantages such as reducing costs, unified management, mobile applications, cross platform, etc. We have also implemented the virtualization technology in EAST control and data system. There are primarily four kinds of technology providers in virtualization technology including VMware, Citrix, Microsoft Hyper-V as well as open source solutions. We have chosen the Citrix solution to implement our virtualization system which mainly includes three aspects. Firstly, we adopt the XenServer technology to realize virtual server for EAST data management and service system. Secondly, we use XenApp technology to realize cross platform system for unify data access. Thirdly, in order to simplify the management of the client computers, we adopt the XenDesktop technology to realize virtual desktops for new central control room. The details of the implementation are described in this paper

  9. Training Teachers of Visually Impaired Children in Rural Tennessee.

    Science.gov (United States)

    Trent, S. D.

    1992-01-01

    A Tennessee program awards stipends to teachers to attend summer classes and a practicum and earn 18 hours of credit in education of children with visual impairments. The program requires that teachers have assurance from their superintendents that they will teach visually impaired students in their school systems after endorsement. (Author/JDD)

  10. The Effects of Year-Round Schools on the Hospitality Industry's Seasonal Labor Force in the State of Tennessee.

    Science.gov (United States)

    Pickeral, Lyn M.; Hubbard, Susan

    2002-01-01

    Data collected from 66 managers in Tennessee tourist attractions indicate that 53 percent of seasonal workers in Tennessee come from the school system. The proposal to implement year-round schools would drastically increase the tourism industry's labor shortage. An alternative labor force needs to be identified and the issue of year-round schools…

  11. Upgrade of ICRF heating system on EAST

    International Nuclear Information System (INIS)

    Chen Gen; Zhao Yanpin; Mao Yuzhou

    2013-01-01

    ICRF (Ion Cyclotron Range of Frequency) heating is an essential heating and current drive tool on EAST (Experimental Advanced Superconducting Tokamak). The high-power steady-state transmitters were designed as a part of research and development of ICRF heating system which aimed at output power of 1.5 MW for 1000 s in a frequency range of 25 to 70 MHz. There are 3 stage power amplifiers for each transmitter. Tube TH525A and TH535 were chosen for drive power amplifier (DPA) and final power amplifier (FPA), respectively. The power supply system of DPA and FPA were upgraded by using reliable PSM high voltage sources, whose response time is less than 5 μs. The ICRF system, which consists of 8 transmitters, will give out more than 10 MW total output power in the future. Four of them have been already fabricated, and another four are under construction. Three liquid stub tuners are used for impedance matching between antennas and transmitters, which can be only tuned shot to shot. There are two fast wave heating antennas which are assembled at I port and B port on EAST. Several projects are in progress including fast response impedance matching, distributed data acquisition and control system and so on for EAST ICRF heating system. (author)

  12. A probabilistic risk assessment of the effects of methylmercury and PCBs on mink and kingfishers along East Fork Poplar Creek, Oak Ridge, Tennessee, USA

    Energy Technology Data Exchange (ETDEWEB)

    Moore, D.R.J.; Sample, B.E.; Suter, G.W.; Parkhurst, B.R.; Teed, R.S.

    1999-12-01

    Over fifty years of operations, storage, and disposal of wastes from the US Department of Energy (US DOE) Y-12 nuclear weapons facility at Oak Ridge, Tennessee, USA, has resulted in the contamination of water, sediment, biota, and floodplain soils of East Fork Poplar Creek. A preliminary assessment revealed that methylmercury and polychlorinated biphenyls (PCBs) were the contaminants of most concern. Because these contaminants are persistent, accumulate in tissues, and biomagnify up the food chain, piscivorous wildlife are the biota at greatest risk of exposure. The objective of this study was to estimate the risks posed by methylmercury and PCBs to two piscivorous species: mink and belted kingfishers. The authors conducted Monte Carlo simulations to estimate total daily intakes of each contaminant by each species and then integrated the resulting distributions with their respective dose-response curves to estimate risks. The results indicate that methylmercury poses a moderate risk to female mink (24% probability of at least 15% mortality) and kingfishers (50% probability of at least a 12--28% decline in fecundity depending on location). The PCBs pose a very serious risk to mink (52% probability of at least a 50% decline in reproductive fecundity), a species known to be especially sensitive to the effects of organochlorine substances, but little risk to kingfishers (<5% probability of a decline in reproductive fecundity greater than 10% at any location).

  13. Design demonstrations for Category B tank system piping at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-02-01

    Demonstration of the design of the tank systems described in this report is stipulated by the Federal Facility Agreement (FFA) between the U.S. Environmental Protection Agency-Region IV, the Tennessee Department of Environment and Conservation, and the U.S. Department of Energy. This report provides a design demonstration of the secondary containment and ancillary equipment of 30 piping systems listed in the FFA as Category B (i.e., existing tank systems with secondary containment). The design demonstrations were developed using information obtained from design drawings (as-built when available), construction specifications, and interviews with facility operators. Each design demonstration addresses system conformance to the requirements of the FFA (Appendix F, Section C). Deficiencies or restrictions regarding the ability to demonstrate that each of the containment systems conforms to FFA requirements are noted in the discussion of each piping system

  14. An application of safer for the Upper East Fork Poplar Creek characterization area at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Lutz, C.T.; Provost, C.A.

    1996-01-01

    The Streamlined Approach for Environmental Restoration (SAFER) has been applied at the US Department of Energy's Y-12 Plant in Oak Ridge, Tennessee. The Y-12 Plant is an operationally and hydrogeologically complex area located within the watershed of Upper East Fork Poplar Creek (UEFPC). The plant has been in operation since 1943 and nearly 175 potentially contaminated sites resulting from past waste management practices have been identified. The need to complete Remedial Investigations (RIs) for the sites in a timely and cost-effective manner has resulted in an approach that considers the entire watershed of UEFPC, which has been designated a open-quotes Characterization Areaclose quotes (CA). This approach emphasizes the watershed rather than individual sites, focuses on key questions and issues, and maximizes the use of existing data. The goal of this approach is to focus work toward the resolution of key questions and decisions necessary to complete the remediation of the CA. An evaluation of the potentially contaminated sites, the development of key questions, and the compilation and analysis of existing data are progressing. A SAFER workshop will be held in 1996, which will allow the project team and stakeholders to discuss the status of the RI, identify additional key questions and issues, and determine the activities necessary to complete the RI. This investigation demonstrates an approach to streamlining the RI process that could be applied successfully to other complex sites

  15. Regulatory Facility Guide for Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, S.S.; Bock, R.E.; Francis, M.W.; Gove, R.M.; Johnson, P.E.; Kovac, F.M.; Mynatt, J.O. [Oak Ridge National Lab., TN (United States); Rymer, A.C. [Transportation Consulting Services, Knoxville, TN (United States)

    1994-02-28

    This guide provides detailed compilations of international, federal, and state transportation related regulations applicable to shipments originating at or destined to Tennessee facilities. Information on preferred routes is also given.

  16. Energy system for Tokyo East 21. Tokyo East 21 energy system

    Energy Technology Data Exchange (ETDEWEB)

    Katsuoka, N. (Kajima Corp., Tokyo (Japan))

    1993-09-01

    The paper reports cogeneration of the Tokyo East 21 building, which is composed of a 21-story office building, a 20-story hotel, and a mall. The heat source system is a combined energy system; that is, midnight power utilization and the large-scale thermal stratification heat storage tank system as electric heat source, and the gas cogeneration system and the gas boiler/the double effect absorption refrigerator as gas heat source. The system is based on the large temperature-difference thermal stratification cooling water bed, supplying water directly to the low-story section, and supplying water to the high-story section through the water-water heat exchanger and by cooling water by the double effect absorption refrigerator and by the closed-loop inverter-control heat flow system. Moreover, for heat source for the water heat source heat pump package in the mall building, the cooling water which is used also for the cogeneration is utilized. It is a cascade-like utilization of low-temperature waste heat. This combined heat source system is found to be the most advantageous in comparison with the overall gas system and the electric heat pump system. 14 figs.

  17. Tennessee State Briefing Book for low-level radioactive waste management

    Energy Technology Data Exchange (ETDEWEB)

    1981-08-01

    The Tennessee State Briefing Book is one of a series of state briefing books on low-level radioactive waste management practices. It has been prepared to assist state and federal agency officials in planning for safe low-level radioactive waste disposal. The report contains a profile of low-level radioactive waste generators in Tennessee. The profile is the result of a survey of NRC licensees in Tennessee. The briefing book also contains a comprehensive assessment of low-level radioactive waste management issues and concerns as defined by all major interested parties including industry, government, the media, and interest groups. The assessment was developed through personal communications with representatives of interested parties, and through a review of media sources. Lastly, the briefing book provides demographic and socioeconomic data and a discussion of relevant government agencies and activities, all of which may impact waste management practices in Tennessee.

  18. Tennessee State Briefing Book for low-level radioactive-waste management

    International Nuclear Information System (INIS)

    1981-08-01

    The Tennessee State Briefing Book is one of a series of State briefing books on low-level radioactive waste management practices. It has been prepared to assist State and Federal Agency officials in planning for safe low-level radioactive waste disposal. The report contains a profile of low-level radioactive waste generators in Tennessee. The profile is the result of a survey of NRC licensees in Tennessee. The briefing book also contains a comprehensive assessment of low-level radioactive waste management issues and concerns as defined by all major interested parties including industry, government, the media, and interest groups. The assessment was developed through personal communications with representatives of interested parties, and through a review of media sources. Lastly, the briefing book provides demographic and socioeconomic data and a discussion of relevant government agencies and activities, all of which may impact waste management practices in Tennessee

  19. Tennessee State Briefing Book for low-level radioactive waste management

    International Nuclear Information System (INIS)

    1981-08-01

    The Tennessee State Briefing Book is one of a series of state briefing books on low-level radioactive waste management practices. It has been prepared to assist state and federal agency officials in planning for safe low-level radioactive waste disposal. The report contains a profile of low-level radioactive waste generators in Tennessee. The profile is the result of a survey of NRC licensees in Tennessee. The briefing book also contains a comprehensive assessment of low-level radioactive waste management issues and concerns as defined by all major interested parties including industry, government, the media, and interest groups. The assessment was developed through personal communications with representatives of interested parties, and through a review of media sources. Lastly, the briefing book provides demographic and socioeconomic data and a discussion of relevant government agencies and activities, all of which may impact waste management practices in Tennessee

  20. New achievements in the EAST plasma control system

    Energy Technology Data Exchange (ETDEWEB)

    Yuan, Q.P., E-mail: qpyuan@ipp.ac.c [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Xiao, B.J. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Penaflor, B.G.; Piglowski, D.A. [General Atomics, DIII-D National Fusion Facility, San Diego, CA (United States); Liu, L.Z. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Johnson, R.D.; Walker, M.L.; Humphreys, D.A. [General Atomics, DIII-D National Fusion Facility, San Diego, CA (United States)

    2010-07-15

    In order to realize the low latency and distortion-free signal transmission between the plasma control system (PCS) and servo systems, the digital output structure configured with reflective memory board (RFM) was adopted in EAST PCS. And the enhanced performances are reported. Another achievement made in the latest EAST PCS was the implementation of density control algorithm, which controlled the line average density in either voltage or width modulation mode. The new integrated algorithm improved the precision of density calculation and control performance greatly. The details and experiment results are presented in this paper.

  1. 77 FR 23472 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2012-04-19

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on April 4, 2012, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in the..., Manager, Certificates, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002...

  2. 78 FR 6313 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2013-01-30

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on January 14, 2013, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in... directed to Thomas G. Joyce, Manager, Certificates, Tennessee Gas Pipeline Company, L.L.C. 1001 Louisiana...

  3. Environmental baseline survey report for West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge and parcel 21D in the vicinity of the East Technology Park, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    King, David A. [Oak Ridge Institute for Science and Education (ORISE), Oak Ridge, TN (United States). Independent Environmental Assessment and Verification Program

    2012-11-29

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of five land parcels located near the U.S. Department of Energy?s (DOE?s) East Tennessee Technology Park (ETTP), including West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge, and Parcel 21d. Preparation of this report included the detailed search of federal government records, title documents, aerial photos that may reflect prior uses, and visual inspections of the property and adjacent properties. Interviews with current employees involved in, or familiar with, operations on the real property were also conducted to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes may have been released or disposed. In addition, a search was made of reasonably obtainable federal, state, and local government records of each adjacent facility where there has been a release of any hazardous substance or any petroleum product or their derivatives, including aviation fuel and motor oil, and which is likely to cause or contribute to a release of any hazardous substance or any petroleum product or its derivatives, including aviation fuel or motor oil, on the real property. A radiological survey and soil/sediment sampling was conducted to assess baseline conditions of Parcel 21d that were not addressed by the soils-only no-further-investigation (NFI) reports. Groundwater sampling was also conducted to support a Parcel 21d decision. Based on available data West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, and West Pine Ridge are not impacted by site operations and are not subject to actions per the Federal Facility Agreement (FFA). This determination is supported by visual inspections, records searches and interviews, groundwater conceptual modeling, approved NFI reports, analytical data, and risk analysis results. Parcel 21d data, however, demonstrate impacts from site

  4. Environmental baseline survey report for West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge and parcel 21D in the vicinity of the East Technology Park, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    King, David A.

    2012-01-01

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of five land parcels located near the U.S. Department of Energy's (DOE's) East Tennessee Technology Park (ETTP), including West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge, and Parcel 21d. Preparation of this report included the detailed search of federal government records, title documents, aerial photos that may reflect prior uses, and visual inspections of the property and adjacent properties. Interviews with current employees involved in, or familiar with, operations on the real property were also conducted to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes may have been released or disposed. In addition, a search was made of reasonably obtainable federal, state, and local government records of each adjacent facility where there has been a release of any hazardous substance or any petroleum product or their derivatives, including aviation fuel and motor oil, and which is likely to cause or contribute to a release of any hazardous substance or any petroleum product or its derivatives, including aviation fuel or motor oil, on the real property. A radiological survey and soil/sediment sampling was conducted to assess baseline conditions of Parcel 21d that were not addressed by the soils-only no-further-investigation (NFI) reports. Groundwater sampling was also conducted to support a Parcel 21d decision. Based on available data West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, and West Pine Ridge are not impacted by site operations and are not subject to actions per the Federal Facility Agreement (FFA). This determination is supported by visual inspections, records searches and interviews, groundwater conceptual modeling, approved NFI reports, analytical data, and risk analysis results. Parcel 21d data, however, demonstrate impacts from site

  5. An economic analysis of a monitored retrievable storage site for Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Fox, W.F.; Mayo, J.W.; Hansen, L.T.; Quindry, K.E.

    1985-12-17

    The United States Department of Energy is charged with the task of identifying potential sites for a Monitored Retrievable Storage (MRS) Facility and reporting the results of its analysis to Congress by January 1986. DOE chose three finalist sites from 11 sites DOE analysts evaluated earlier. All three are in Tennessee, including two in Oak Ridge and one in Trousdale/Smith Counties. This paper is a summary of research undertaken on the economic effects of establishing the MRS facility in Tennessee. All three locations were considered in the analysis, but on some occasions attention is focused on the site preferred by DOE. The research was undertaken by the Center for Business and Economic Research (CBER), College of Business Administration, the University of Tennessee, Knoxville, under contract with the Tennessee Department of Economic and Community Development.

  6. Central control system for the EAST tokamak

    International Nuclear Information System (INIS)

    Sun Xiaoyang; Ji Zhenshan; Wu Yicun; Luo Jiarong

    2008-01-01

    The architecture, the main function and the design scheme of the central control system and the collaboration system of EAST tokamak are described. The main functions of the central control system are to supply a union control interface for all the control, diagnoses, and data acquisition (DAQ) subsystem and it is also designed to synchronize all those subsystem. (authors)

  7. Comparative uptake of uranium, thorium, and plutonium by biota inhabiting a contaminated Tennessee floodplain

    International Nuclear Information System (INIS)

    Garten, C.T. Jr.; Bondietti, E.A.; Walker, R.L.

    1981-01-01

    The uptake of 238 U, 232 Th, and 239 Pu from soil by fescue, grasshoppers, and small mammals was compared at the contaminated White Oak Creek floodplain in East Tennessee. Comparisons of actinide uptake were based on analyses of radionuclide ratios (U/Pu and Th/Pu) in soil and biota. U:Pu ratios in small mammal carcasses (shrews, mice, and rats) and bone samples from larger mammals (rabbit, woodchuck, opossum, and raccoon) were significantly greater (P less than or equal to 0.05) than U/Pu ratios in soil (based on 8M HNO 3 extractable). There was no significant difference between Th/Pu ratios in animals and soil. The order of actinide accumulation by biota from the site relative to contaminated soil was U > Th approx. = Pu

  8. Integrated solid waste management of Sevierville, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The subject document reports the results of an in-depth investigation of the fiscal year 1992 cost of the City of Sevierville, Tennessee integrated municipal solid waste management (IMSWM) system, the energy consumed to operate the system, and the environmental performance requirements for each of the system`s waste-processing and disposal facilities. Actual data from records kept by participants is reported in this document. Every effort was made to minimize the use of assumptions, and no attempt is made to interpret the data reported. Analytical approaches are documented so that interested analysts may perform manipulation or further analysis of the data. As such, the report is a reference document for MSW management professionals who are interested in the actual costs and energy consumption for a one-year period, of an operating IMSWM systems.

  9. First report on the Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program for East Fork Poplar Creek

    Energy Technology Data Exchange (ETDEWEB)

    Loar, J.M.; Adams, S.M.; Allison, L.J.; Boston, H.L.; Huston, M.A.; McCarthy, J.F.; Smith, J.G.; Southworth, G.R.; Stewart, A.J. (Oak Ridge National Lab., TN (United States)); Black, M.C. (Oklahoma State Univ., Stillwater, OK (United States)); Gatz, A.J. Jr. (Ohio Wesleyan Univ., Delaware, OH (United States)); Hinzman, R.L. (Oak Ridge Research Inst., TN (United States)); Jimenez, B.D. (Puerto Rico Univ.,

    1992-07-01

    As stipulated in the National Pollutant Discharge Elimination System (NPDES) permit issued to the Oak Ridge Y-12 Plant on May 24, 1985, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream, East Fork Poplar Creek (EFPC). The objectives of the BMAP are (1) to demonstrate that the current effluent limitations established for the Oak Ridge Y-12 Plant protect the uses of EFPC (e.g., the growth and propagation of fish and aquatic life), as designated by the Tennessee Department of Environment and Conservation (TDEC) [formerly the Tennessee Department of Health and Environment (TDHE)], and (2) to document the ecological effects resulting from implementation of a water pollution control program that includes construction of several large wastewater treatment facilities. The BMAP consists of four major tasks: (1) ambient toxicity testing, (2) bioaccumulation studies, (3) biological indicator studies, and (4) ecological surveys of stream communities, including periphyton (attached algae), benthic macroinvertebrates, and fish. This document, the first in a series of reports on the results of the Y-12 Plant BMAP, describes studies that were conducted from May 1985 through September 1986.

  10. Community Energy Systems and the Law of Public Utilities. Volume Forty-four. Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Feurer, D.A.; Weaver, C.L.

    1981-01-01

    A detailed description is presented of the laws and programs of the State of Tennessee governing the regulation of public energy utilities, the siting of energy generating and transmission facilities, the municipal franchising of public energy utilities, and the prescription of rates to be charged by utilities including attendant problems of cost allocations, rate base and operating expense determinations, and rate of return allowances. These laws and programs are analyzed to identify impediments which they may present to the implementation of Integrated Community Energy Systems (ICES). This report is one of fifty-one separate volumes which describe such regulatory programs at the Federal level and in each state as background to the report entitled Community Energy Systems and the Law of Public Utilities - Volume One: An Overview. This report also contains a summary of a strategy described in Volume One - An Overview for overcoming these impediments by working within the existing regulatory framework and by making changes in the regulatory programs to enhance the likelihood of ICES implementation.

  11. 40 CFR 81.119 - Western Tennessee Intrastate Air Quality Control Region.

    Science.gov (United States)

    2010-07-01

    ... Quality Control Region. 81.119 Section 81.119 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Air Quality Control Regions § 81.119 Western Tennessee Intrastate Air Quality Control Region. The Western Tennessee Intrastate Air Quality Control Region consists of the territorial area encompassed by...

  12. 40 CFR 81.120 - Middle Tennessee Intrastate Air Quality Control Region.

    Science.gov (United States)

    2010-07-01

    ... Quality Control Region. 81.120 Section 81.120 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Air Quality Control Regions § 81.120 Middle Tennessee Intrastate Air Quality Control Region. The Middle Tennessee Intrastate Air Quality Control Region consists of the territorial area encompassed by...

  13. Y-12 Groundwater Protection Program Calendar Year 2000 Groundwater Monitoring Data Evaluation Report for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee; FINAL

    International Nuclear Information System (INIS)

    None

    2001-01-01

    This report presents an evaluation of the groundwater and surface water monitoring data obtained during calendar year (CY) 2000 in the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime). The East Fork Regime encompasses many confirmed and potential sources of groundwater and surface water contamination associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee. Prepared under the auspices of the Y-12 Groundwater Protection Program (GWPP), this report addresses applicable provisions of DOE Order 5400.1 (General Environmental Protection Program) that require: (1) an evaluation of the quantity and quality of groundwater and surface water in areas that are, or could be, affected by Y-12 operations, (2) an evaluation of groundwater and surface water quality in areas where contaminants from Y-12 operations are most likely to migrate beyond the DOE Oak Ridge Reservation (ORR) property line, and (3) an evaluation of long-term trends in groundwater quality at Y-12. The following sections of this report contain relevant background information (Section 2.0); describe the results of the respective data evaluations required under DOE Order 5400.1 (Section 3.0); summarize significant findings of each evaluation (Section 4.0); and list the technical reports and regulatory documents cited for more detailed information (Section 5.0). Illustrations (maps and trend graphs) are presented in Appendix A. Brief data summary tables referenced in each section are contained within the text; supplemental information and extensive data tables are provided in Appendix B

  14. Conceptual design of Remote Control System for EAST tokamak

    International Nuclear Information System (INIS)

    Sun, X.Y.; Wang, F.; Wang, Y.; Li, S.

    2014-01-01

    Highlights: • A new design conception for remote control for EAST tokamak is proposed. • Rich Internet application (RIA) was selected to implement the user interface. • Some security mechanism was used to fulfill security requirement. - Abstract: The international collaboration becomes popular in tokamak research like in many other fields of science, because the experiment facilities become larger and more expensive. The traditional On-site collaboration Model that has to spend much money and time on international travel is not fit for the more frequent international collaboration. The Remote Control System (RCS), as an extension of the Central Control System for the EAST tokamak, is designed to provide an efficient and economical way to international collaboration. As a remote user interface, the RCS must integrate with the Central Control System for EAST tokamak to perform discharge control function. This paper presents a design concept delineating a few key technical issues and addressing all significant details in the system architecture design. With the aim of satisfying system requirements, the RCS will select rich Internet application (RIA) as a user interface, Java as a back-end service and Secure Socket Layer Virtual Private Network (SSL VPN) for securable Internet communication

  15. Conceptual design of Remote Control System for EAST tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Sun, X.Y., E-mail: xysun@ipp.ac.cn; Wang, F.; Wang, Y.; Li, S.

    2014-05-15

    Highlights: • A new design conception for remote control for EAST tokamak is proposed. • Rich Internet application (RIA) was selected to implement the user interface. • Some security mechanism was used to fulfill security requirement. - Abstract: The international collaboration becomes popular in tokamak research like in many other fields of science, because the experiment facilities become larger and more expensive. The traditional On-site collaboration Model that has to spend much money and time on international travel is not fit for the more frequent international collaboration. The Remote Control System (RCS), as an extension of the Central Control System for the EAST tokamak, is designed to provide an efficient and economical way to international collaboration. As a remote user interface, the RCS must integrate with the Central Control System for EAST tokamak to perform discharge control function. This paper presents a design concept delineating a few key technical issues and addressing all significant details in the system architecture design. With the aim of satisfying system requirements, the RCS will select rich Internet application (RIA) as a user interface, Java as a back-end service and Secure Socket Layer Virtual Private Network (SSL VPN) for securable Internet communication.

  16. EAST-AIA deployment under vacuum: Calibration of laser diagnostic system using computer vision

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Yang, E-mail: yangyang@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China); Song, Yuntao; Cheng, Yong; Feng, Hansheng; Wu, Zhenwei; Li, Yingying; Sun, Yongjun; Zheng, Lei [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China); Bruno, Vincent; Eric, Villedieu [CEA-IRFM, F-13108 Saint-Paul-Lez-Durance (France)

    2016-11-15

    Highlights: • The first deployment of the EAST articulated inspection arm robot under vacuum is presented. • A computer vision based approach to measure the laser spot displacement is proposed. • An experiment on the real EAST tokamak is performed to validate the proposed measure approach, and the results shows that the measurement accuracy satisfies the requirement. - Abstract: For the operation of EAST tokamak, it is crucial to ensure that all the diagnostic systems are in the good condition in order to reflect the plasma status properly. However, most of the diagnostic systems are mounted inside the tokamak vacuum vessel, which makes them extremely difficult to maintain under high vacuum condition during the tokamak operation. Thanks to a system called EAST articulated inspection arm robot (EAST-AIA), the examination of these in-vessel diagnostic systems can be performed by an embedded camera carried by the robot. In this paper, a computer vision algorithm has been developed to calibrate a laser diagnostic system with the help of a monocular camera at the robot end. In order to estimate the displacement of the laser diagnostic system with respect to the vacuum vessel, several visual markers were attached to the inner wall. This experiment was conducted both on the EAST vacuum vessel mock-up and the real EAST tokamak under vacuum condition. As a result, the accuracy of the displacement measurement was within 3 mm under the current camera resolution, which satisfied the laser diagnostic system calibration.

  17. Filterscope diagnostic system on EAST tokamak

    International Nuclear Information System (INIS)

    Xu, Z.; Wu, Z.W.; Gao, W.; Zhang, L.; Huang, J.; Chen, Y.J.; Wu, C.R.; Zhang, P.F.

    2015-01-01

    Filterscope diagnostic system, which is designed for monitoring the line emission in fusion plasma has been widely used on fusion devices such as DIII-D, NSTX, CDX-U, KSTAR etc. On EAST (Experimental Advanced Superconducting Tokamak), a filterscope diagnostic system has been mounted to observe the line emission and visible bremsstrahlung emission in plasma from discharge campaign of 2014. It plays a crucial role in studying Edge Localized Modes (ELM) and H-mode, thanks to its high temporal resolution (0.005ms) and good spatial resolution (∼2cm). Furthermore, multi-channel signals at up to 200kHz sampling rates can be digitized simultaneously. The wavelength covers He II (468.5nm), Li I (670.8nm), Li II (548.3nm), C III (465.0nm), O II (441.5nm), Mo I (386.4nm), W I (400.9nm) and visible bremsstrahlung radiation at 538nm besides Dα (656.1nm) and Dγ (433.9nm) with the corresponding wavelength filters. The new developed filterscope system was operating during the EAST 2014 fall experimental campaign and several types ELMs has been observed. (author)

  18. Multi-scenario electromagnetic load analysis for CFETR and EAST magnet systems

    Energy Technology Data Exchange (ETDEWEB)

    Xu, Weiwei; Liu, Xufeng, E-mail: lxf@ipp.ac.cn; Du, Shuangsong; Song, Yuntao

    2017-01-15

    Highlights: • A multi-scenario force-calculating simulator for Tokamak magnet system is developed using interaction matrix method. • The simulator is applied to EM analysis of CFETR and EAST magnet system. • The EM loads on CFETR magnet coils at different typical scenarios and the EM loads acting on magnet system of EAST as function of time for different shots are analyzed with the simulator. • Results indicate that the approach can be conveniently used for multi-scenario and real-time EM analysis of Tokamak magnet system. - Abstract: A technology for electromagnetic (EM) analysis of the current-carrying components in tokamaks has been proposed recently (Rozov, 2013; Rozov and Alekseev, 2015). According to this method, the EM loads can be obtained by a linear transform of given currents using the pre-computed interaction matrix. Based on this technology, a multi-scenario force-calculating simulator for Tokamak magnet system is developed using Fortran programming in this paper. And the simulator is applied to EM analysis of China Fusion Engineering Test Reactor (CFETR) and Experimental Advanced Superconducting Tokamak (EAST) magnet system. The pre-computed EM interaction matrices of CFETR and EAST magnet system are implanted into the simulator, then the EM loads on CFETR magnet coils at different typical scenarios are evaluated with the simulator, and the comparison of the results with ANSYS method results validates the efficiency and accuracy of the method. Using the simulator, the EM loads acting on magnet system of EAST as function of time for different shots are further analyzed, and results indicate that the approach can be conveniently used for the real-time EM analysis of Tokamak magnet system.

  19. Babies and bearded dragons: sudden increase in reptile-associated Salmonella enterica serovar Tennessee infections, Germany 2008.

    Science.gov (United States)

    Weiss, Bettina; Rabsch, Wolfgang; Prager, Rita; Tietze, Erhard; Koch, Judith; Mutschmann, Frank; Roggentin, Peter; Frank, Christina

    2011-09-01

    In 2008 a marked increase in Salmonella enterica serovar Tennessee infections in infants occurred in Germany. In March and April 2008, eight cases were notified compared to a median of 0-1 cases in 2001-2006. We carried out an investigation including a case-control study to identify the source of infection. A patient was a child < 3 years of age with Salmonella Tennessee isolated from stool from September 1, 2007, through December 31, 2008, identified through the national surveillance system. A control was a child with a notified rotavirus infection in the matching district, frequency matched by age group. We conducted telephone interviews on feeding, herbal infusions, and animal contact. Matched odds ratios (mOR) were calculated using exact conditional logistic regression. For Salmonella Tennessee isolates, pulsed-field gel electrophoresis and multiple-locus variable number tandem repeat analysis were performed. Further cloacal swab samples of reptiles kept in case households were investigated. We identified 18 cases < 3 years. Ten children were male; median age was 3 months (1-32 months). In 8 of 16 case households reptiles were kept. Direct contact between child and reptile was denied. Other forms of reptile contact were reported in four of the remaining eight households. Ten case- and 21 control-patients were included in the study. Only keeping of a reptile and "any reptile contact" were associated with Salmonella Tennessee infection (mOR 29.0; 95% CI 3.1 ± ∞ and mOR 119.5; 95% CI 11.7 - ∞). Identical Salmonella Tennessee strains of child and reptile kept in the same household could be shown in 2 cases. Reptiles were the apparent source of Salmonella Tennessee infection in these infants. Indirect contact between infants and reptiles seems to be sufficient to cause infection and should therefore be avoided.

  20. Conceptual design main progress of EAST Articulated Maintenance Arm (EAMA) system

    Energy Technology Data Exchange (ETDEWEB)

    Shi, Shanshuang, E-mail: shiss@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); Laboratory of Intelligent Machines, Lappeenranta University of Technology (Finland); Song, Yuntao; Cheng, Yong [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); Villedieu, Eric; Bruno, Vincent [CEA-IRFM, F-13108 Saint-Paul-Lez-Durance (France); Feng, Hansheng [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); Wu, Huapeng [Laboratory of Intelligent Machines, Lappeenranta University of Technology (Finland); Wang, Peng [State Key Laboratory of Solid Lubrication, Lanzhou Institute of Chemical Physics, Chinese Academy of Sciences, Lanzhou 730000 (China); Hao, Zhiwei; Li, Yang; Wang, Kun; Pan, Hongtao [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China)

    2016-03-15

    Highlights: • EAST Articulated Maintenance Arm (EAMA) system is being collaboratively developed by ASIPP and CEA-IRFM. • Conceptual design for a 3-DOF wrist end effector with gripper has been finished. • Kinematic design can reach 90% of the workspace inside EAST tokamak vessel. • A prototype of EAMA arm segment has been built to validate the design. - Abstract: EAST articulated maintenance arm (EAMA) system is being collaboratively developed by ASIPP and CEA-IRFM for the purpose of remote inspection and simple maintenance operations in EAST vacuum vessel during physical experiments without breaking the ultra-high vacuum condition. The EAMA system design is based on a similar articulated inspection arm robot successfully demonstrated in Tore Supra in 2008. In order to better meet EAST configurations and maintenance requirements, optimized mechanisms and dimensions are considered for EAMA robot as upgrades. Besides, the segmented arm is equipped with a 3-DOF wrist end effector and gripper for gripping operation as well as inspection. Some calculations and simulations on statics, kinematics and workspace of EAMA have been presented to validate the feasibility. This paper introduces the overall design of the EAMA robot and presents implementation progress.

  1. Conceptual design main progress of EAST Articulated Maintenance Arm (EAMA) system

    International Nuclear Information System (INIS)

    Shi, Shanshuang; Song, Yuntao; Cheng, Yong; Villedieu, Eric; Bruno, Vincent; Feng, Hansheng; Wu, Huapeng; Wang, Peng; Hao, Zhiwei; Li, Yang; Wang, Kun; Pan, Hongtao

    2016-01-01

    Highlights: • EAST Articulated Maintenance Arm (EAMA) system is being collaboratively developed by ASIPP and CEA-IRFM. • Conceptual design for a 3-DOF wrist end effector with gripper has been finished. • Kinematic design can reach 90% of the workspace inside EAST tokamak vessel. • A prototype of EAMA arm segment has been built to validate the design. - Abstract: EAST articulated maintenance arm (EAMA) system is being collaboratively developed by ASIPP and CEA-IRFM for the purpose of remote inspection and simple maintenance operations in EAST vacuum vessel during physical experiments without breaking the ultra-high vacuum condition. The EAMA system design is based on a similar articulated inspection arm robot successfully demonstrated in Tore Supra in 2008. In order to better meet EAST configurations and maintenance requirements, optimized mechanisms and dimensions are considered for EAMA robot as upgrades. Besides, the segmented arm is equipped with a 3-DOF wrist end effector and gripper for gripping operation as well as inspection. Some calculations and simulations on statics, kinematics and workspace of EAMA have been presented to validate the feasibility. This paper introduces the overall design of the EAMA robot and presents implementation progress.

  2. Pasteuria Nishizawae Studies in Tennessee

    Science.gov (United States)

    Spores of Pasteuria nishizawae were first recovered in Tennessee in 2008 attached to soybean cyst nematode juveniles, Heterodera glycines, and inside cysts extracted from soil collected at Ames Plantation, Grand Junction, TN. The field had a 15% increase from 1997 through 2004 in number of samples ...

  3. Tennessee's forest land area was stable 1999-2005 but early successional forest area declined

    Science.gov (United States)

    Christopher M. Oswalt

    2008-01-01

    A new analysis of the most recent (2005) annualized moving average data for Tennessee indicates that the area of forest land in the State remained stable between 1999 and 2005. Although trends in forest land area vary from region to region within the State, Tennessee neither lost nor gained forest land between 1999 and 2005. However, Tennessee had more than 2.5 times...

  4. A retrospective study of the chemical analysis cost for the remediation of Lower East Fork Poplar Creek, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Klatt, L.N.

    1998-06-01

    A retrospective study of the remediation of Lower East Fork Poplar Creek (LEFPC) in Oak Ridge, Tennessee was completed. The study was conducted by reviewing the public Comprehensive Environmental Response, Compensation, and Liability Act record documents associated with the remediation of LEFPC and through discussions with the project staff involved or familiar with the project. The remediation took place in two phases. The first phase involved the excavation of about 5,560 yd 3 of soil at the National Oceanic and Atmospheric Administration (NOAA) locations in 1996. The second phase involved the excavation of 39,200 yd 3 at another NOAA location and at the Bruner location in 1997. For the entire project (remedial investigation through cleanup), a total of 7,708 samples (1 sample for each 5.8 yd 3 of soil remediated) were analyzed for mercury. The project obtained special regulatory approval to use two methods for the determination of mercury in soils that are not part of the Resource Conservation and Recovery Act SW-846 methods manual. The mercury analysis cost was $678,000, which represents 9.6% of the cleanup cost. During the cleanup phase of the project, an on-site laboratory was used. The estimated cost savings that the on-site laboratory provided fall into two categories: direct reduction of costs associated with chemical analysis and sample shipment totaling approximately $38,000, which represents a 5.3% savings relative to the estimated cost of using an off-site laboratory, and savings in the amount of $890,000 (12.5% of the $7.1 M cleanup cost), associated with expediting execution of the cleanup work by providing rapid (< 3 hours) sample result turnaround time. The manner in which the analytical services were procured for the LEFPC project suggest that the development of new chemical analysis technology must address deployment, performance, regulatory, robustness, reliability, and business appropriateness factors if the technology is to be used in

  5. NREPS Applications for Water Supply and Management in California and Tennessee

    Science.gov (United States)

    Gatlin, P.; Scott, M.; Carery, L. D.; Petersen, W. A.

    2011-01-01

    Management of water resources is a balancing act between temporally and spatially limited sources and competitive needs which can often exceed the supply. In order to manage water resources over a region such as the San Joaquin Valley or the Tennessee River Valley, it is pertinent to know the amount of water that has fallen in the watershed and where the water is going within it. Since rain gauge networks are typically sparsely spaced, it is typical that the majority of rainfall on the region may not be measured. To mitigate this under-sampling of rainfall, weather radar has long been employed to provide areal rainfall estimates. The Next-Generation Weather Radars (NEXRAD) make it possible to estimate rainfall over the majority of the conterminous United States. The NEXRAD Rainfall Estimation Processing System (NREPS) was developed specifically for the purpose of using weather radar to estimate rainfall for water resources management. The NREPS is tailored to meet customer needs on spatial and temporal scales relevant to the hydrologic or land-surface models of the end-user. It utilizes several techniques to mitigate artifacts in the NEXRAD data from contaminating the rainfall field. These techniques include clutter filtering, correction for occultation by topography as well as accounting for the vertical profile of reflectivity. This presentation will focus on improvements made to the NREPS system to map rainfall in the San Joaquin Valley for NASA s Water Supply and Management Project in California, but also ongoing rainfall mapping work in the Tennessee River watershed for the Tennessee Valley Authority and possible future applications in other areas of the continent.

  6. Design demonstrations for Category B tank systems piping at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-12-01

    Demonstration of the design of the piping systems described in this report is stipulated by the Federal Facility Agreement (FFA) between the U.S. Environmental Protection Agency (EPA)-Region IV, the Tennessee Department of Environment and Conservation (TDEC), and the U.S. Department of Energy (DOE). This report provides a design demonstration of the secondary containment and ancillary equipment of 30 piping systems designated in the FFA as Category B (i.e., existing tank systems with secondary containment). Based on the findings of the Design Demonstrations for the Remaining 19 Category B Tank Systems, (DOE/OR/03-1150 ampersand D2), three tank systems originally designated as Category B have been redesignated as Category C (i.e., existing tank systems without secondary containment). The design demonstrations were developed using information obtained from design drawings (as-built when available), construction specifications, and interviews with facility operators. Each design demonstration addresses system conformance to the requirements of the FFA (Appendix F, Section C). Deficiencies or restrictions regarding the ability to demonstrate that each of the containment systems conforms to FFA requirements are noted in the discussion of each piping system and presented in Table 2.0-1

  7. The design of remote discharge scenario management system on EAST

    Energy Technology Data Exchange (ETDEWEB)

    Chai, W.T, E-mail: wtchai@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); University of Science and Technology of China, Hefei, Anhui (China); Xiao, B.J [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); University of Science and Technology of China, Hefei, Anhui (China); Yuan, Q.P; Zhang, R.R. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China)

    2016-11-15

    Highlights: • The remote discharge scenario management system is established on EAST, it provides some useful function for operators to manage discharge scenarios and formulate discharge schedule. • Operators can use this system to formulate discharge schedule on account of it can electing optimal scenarios automatically. • The system is not only for local user but also for remote user. • In the future, we can combine with actual discharge data and data mining technology to acquire optimal configuration, which to generate expert database and guiding experiment. - Abstract: The discharge scenarios on EAST plasma control system (PCS), characterized by different waveform parameters and different hardware requirements, will need a systematic discharge scenario management system for remote and local operators, in order to optimize storage structure and rationally manage discharge time. The remote management of discharge scenarios will require extending the functionalities of the present PCS “future shot” and “next shot” modules. Taking advantage of database technique, the operators can acquire detail information of all discharge scenarios directly without PCS user interface and search the specified scenarios by key words. In addition, the system can elect optimal scenarios automatically based on discharge schedule and plasma pulse setting for later artificial selection. To this purpose, a new remote discharge scenario management system (RDSMS) basis for Web is being conceived on EAST. The system contains a database with functions of “user management”, “scenario verification”, “prepared scenario management”, “actual discharge scenario management” and “discharge schedule management”. This paper will present the relevant conceptual design and give an account of the test results for implementation on EAST discharges.

  8. The design of remote discharge scenario management system on EAST

    International Nuclear Information System (INIS)

    Chai, W.T; Xiao, B.J; Yuan, Q.P; Zhang, R.R.

    2016-01-01

    Highlights: • The remote discharge scenario management system is established on EAST, it provides some useful function for operators to manage discharge scenarios and formulate discharge schedule. • Operators can use this system to formulate discharge schedule on account of it can electing optimal scenarios automatically. • The system is not only for local user but also for remote user. • In the future, we can combine with actual discharge data and data mining technology to acquire optimal configuration, which to generate expert database and guiding experiment. - Abstract: The discharge scenarios on EAST plasma control system (PCS), characterized by different waveform parameters and different hardware requirements, will need a systematic discharge scenario management system for remote and local operators, in order to optimize storage structure and rationally manage discharge time. The remote management of discharge scenarios will require extending the functionalities of the present PCS “future shot” and “next shot” modules. Taking advantage of database technique, the operators can acquire detail information of all discharge scenarios directly without PCS user interface and search the specified scenarios by key words. In addition, the system can elect optimal scenarios automatically based on discharge schedule and plasma pulse setting for later artificial selection. To this purpose, a new remote discharge scenario management system (RDSMS) basis for Web is being conceived on EAST. The system contains a database with functions of “user management”, “scenario verification”, “prepared scenario management”, “actual discharge scenario management” and “discharge schedule management”. This paper will present the relevant conceptual design and give an account of the test results for implementation on EAST discharges.

  9. Cost-Effectiveness Analysis of the Residential Provisions of the 2015 IECC for Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Mendon, Vrushali V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zhao, Mingjie [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Taylor, Zachary T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Poehlman, Eric A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-02-15

    The 2015 IECC provides cost-effective savings for residential buildings in Tennessee. Moving to the 2015 IECC from the 2006 IECC base code is cost-effective for residential buildings in all climate zones in Tennessee.

  10. Hardware-in-the-loop simulation of the EAST PF converter for PF control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Xiaojiao, E-mail: chenxj@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Science (ASIPP), P.O. Box 1126, Hefei, Anhui Province 230031 (China); Chinese University of Science and Technology, Hefei, Anhui Province 230022 (China); Fu, Peng [Institute of Plasma Physics, Chinese Academy of Science (ASIPP), P.O. Box 1126, Hefei, Anhui Province 230031 (China); Chinese University of Science and Technology, Hefei, Anhui Province 230022 (China); Huang, Liansheng, E-mail: huangls@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Science (ASIPP), P.O. Box 1126, Hefei, Anhui Province 230031 (China); Gao, Ge; He, Shiying [Institute of Plasma Physics, Chinese Academy of Science (ASIPP), P.O. Box 1126, Hefei, Anhui Province 230031 (China)

    2016-11-15

    Highlights: • The hardware in the loop simulation of the EAST PF system is presented. • The control functions and the protection logic have been tested and verified. • The major faults could be avoided and commissioning time could be saved on site. - Abstract: The EAST poloidal field (PF) control system was upgraded in 2015 and the new system has been in use for the 2015 EAST campaign. This paper presents the implementation of a hardware-in-the-loop (HIL) simulation platform of the EAST PF converter system based on the RT-LAB simulation environment, which was used to improve and evaluate the performance of the real controller. The EAST PF power supply system and its operational modes are presented in this paper. The experiments on HIL simulation platform show that the control algorithms and the over current protection of the controller meet the design requirements well. In addition, the effectiveness of the designed control system has been verified by actual application during the EAST campaign at 2015 for six months.

  11. Hardware-in-the-loop simulation of the EAST PF converter for PF control system upgrade

    International Nuclear Information System (INIS)

    Chen, Xiaojiao; Fu, Peng; Huang, Liansheng; Gao, Ge; He, Shiying

    2016-01-01

    Highlights: • The hardware in the loop simulation of the EAST PF system is presented. • The control functions and the protection logic have been tested and verified. • The major faults could be avoided and commissioning time could be saved on site. - Abstract: The EAST poloidal field (PF) control system was upgraded in 2015 and the new system has been in use for the 2015 EAST campaign. This paper presents the implementation of a hardware-in-the-loop (HIL) simulation platform of the EAST PF converter system based on the RT-LAB simulation environment, which was used to improve and evaluate the performance of the real controller. The EAST PF power supply system and its operational modes are presented in this paper. The experiments on HIL simulation platform show that the control algorithms and the over current protection of the controller meet the design requirements well. In addition, the effectiveness of the designed control system has been verified by actual application during the EAST campaign at 2015 for six months.

  12. Implementation Plan for Liquid Low-Level Radioactive Waste tank systems at Oak Ridge National Laboratory under the Federal Facility Agreement, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-09-01

    This document summarizes the progress that has been made to date in implementing the plans and schedules for meeting the Federal Facility Agreement (FFA) commitments for the Liquid Low-Level Waste (LLLW) System at Oak Ridge National Laboratory (ORNL). These commitments were initially submitted in ES/ER-17 ampersand Dl, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Information presented in this document provides a comprehensive summary to facilitate understanding of the FFA compliance program for LLLW tank systems and to present plans and schedules associated with remediation, through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process, of LLLW tank systems that have been removed from service. ORNL has a comprehensive program underway to upgrade the LLLW system as necessary to meet the FFA requirements. The tank systems that are removed from service are being investigated and remediated through the CERCLA process. Waste and risk characterizations have been submitted. Additional data will be prepared and submitted to EPA/TDEC as tanks are taken out of service and as required by the remedial investigation/feasibility study (RI/FS) process. The plans and schedules for implementing the FFA compliance program that were submitted in ES/ER-17 ampersand Dl, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste tanks Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee, are updated in this document. Chapter 1 provides general background information and philosophies that lead to the plans and schedules that appear in Chaps. 2 through 5

  13. Impact of anthropogenic aerosols from global, East Asian, and non-East Asian sources on East Asian summer monsoon system

    Science.gov (United States)

    Wang, Qiuyan; Wang, Zhili; Zhang, Hua

    2017-01-01

    The impact of the total effects due to anthropogenic aerosols from global, East Asian, and non-East Asian sources on East Asian summer monsoon (EASM) system is studied using an aerosol-climate online model BCC_AGCM2.0.1_CUACE/Aero. The results show that the summer mean net all-sky shortwave fluxes averaged over East Asian monsoon region (EAMR) at the top of the atmosphere (TOA) and surface reduce by 4.8 and 5.0 W m- 2, respectively, due to the increases of global aerosol emissions in 2000 relative to 1850. Changes in radiations and their resulting changes in heat and water transport and cloud fraction contribute together to the surface cooling over EAMR in summer. The increases in global anthropogenic aerosols lead to a decrease of 2.1 K in summer mean surface temperature and an increase of 0.4 hPa in summer mean surface pressure averaged over EAMR, respectively. It is shown that the changes in surface temperature and pressure are significantly larger over land than ocean, thus decreasing the contrast of land-sea surface temperature and pressure. This results in the marked anomalies of north and northeast winds over eastern and southern China and the surrounding oceans in summer, thereby weakening the EASM. The summer mean precipitation averaged over the EAMR reduces by 12%. The changes in non-East Asian aerosol emissions play a more important role in inducing the changes of local temperature and pressure, and thus significantly exacerbate the weakness of the EASM circulation due to local aerosol changes. The weakening of circulation due to both is comparable, and even the effect of non-local aerosols is larger in individual regions. The changes of local and non-local aerosols contribute comparably to the reductions in precipitation over oceans, whereas cause opposite changes over eastern China. Our results highlight the importance of aerosol changes outside East Asia in the impact of the changes of anthropogenic aerosols on EASM.

  14. Annual Storm Water Report for the Y-12 National Security Complex Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Environment Compliance Department

    2012-01-01

    The storm water pollution prevention program at the Y-12 National Security Complex (Y-12 Complex) intends to protect the quality of storm water runoff through: (1) reducing the exposure of metal accumulation areas to precipitation, (2) implementation of Best Management Practices, (3) sampling during rain events and subsequent analysis, and (4) routine surveillances. When prescribed, the analytical data is compared to a set of cut-off concentration values to determine how the Y-12 Complex relates to other metal fabrication industries in the state of Tennessee. The quality of the storm water exiting the Y-12 Complex via East Fork Poplar Creek indicated some improvement in 2011. This improvement is attributable to the completion of several construction, demolition and remediation projects which occurred in 2010 and 2011. Emphasis will continue to be placed on site inspections and the timely implementation of improved storm water control measures as deemed necessary.

  15. Annual Storm Water Report for the Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Clean Water Compliance Section of the Environment Compliance Department

    2012-01-01

    The storm water pollution prevention program at the Y-12 National Security Complex (Y-12 Complex) intends to protect the quality of storm water runoff through: (1) reducing the exposure of metal accumulation areas to precipitation, (2) implementation of Best Management Practices, (3) sampling during rain events and subsequent analysis, and (4) routine surveillances. When prescribed, the analytical data is compared to a set of cut-off concentration values to determine how the Y-12 Complex relates to other metal fabrication industries in the state of Tennessee. The quality of the storm water exiting the Y-12 Complex via East Fork Poplar Creek indicated some improvement in 2011. This improvement is attributable to the completion of several construction, demolition and remediation projects which occurred in 2010 and 2011. Emphasis will continue to be placed on site inspections and the timely implementation of improved storm water control measures as deemed necessary.

  16. A Distributed Synchronization and Timing System on the EAST Tokamak

    Science.gov (United States)

    Luo, Jiarong; Wu, Yichun; Shu, Yantai

    2008-08-01

    A key requirement for the EAST distributed control system (EASTDCS) is time synchronization to an accuracy of RTOS). The DSTS provides the control and the data acquisition systems with reference clocks (0.01 Hz 10 MHz) and delayed trigger times ( 1 mus 4294 s). These are produced by a Core Module Unit (CMU) connected by optical fibres to many Local Synchronized Node Units (LSNU). The fibres provide immunity from electrical noise and are of equal length to match clock and trigger delays between systems. This paper describes the architecture of the DSTS on the EAST tokamak and provides an overview of the characteristics of the main and local units.

  17. Master Plan for Tennessee Schools, 1995: Preparing for the 21st Century.

    Science.gov (United States)

    Tennessee State Board of Education, Nashville.

    The Tennessee State Legislature passed the Education Improvement Act (EIA) in 1992, which established the Basic Education Program (BEP) as the funding formula for providing adequate, equitable, and sustainable school funding. This document presents the 1995 Master Plan for Tennessee Schools, which focuses on the priority issues that must be…

  18. Design and development of a device management platform for EAST cryogenic system

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Zhiwei, E-mail: zzw@ipp.ac.cn; Lu, Xiaofei, E-mail: xiaofeilu@ipp.ac.cn; Zhuang, Ming, E-mail: zhm@ipp.ac.cn; Hu, Liangbing, E-mail: huliangbing@ipp.ac.cn; Xia, Genhai, E-mail: xgh@ipp.ac.cn

    2014-05-15

    Highlights: • A device management platform for EAST cryogenic system based on DCS is designed. • This platform enhances the integrity and continuity of system device information. • It can help predictive maintenance and device management decision. - Abstract: EAST cryogenic system is one of the critical sub-systems of the EAST tokamak device. It is a large scale helium cryoplant, which adopts distributed control system to realize monitoring and control of the cryogenic process and devices. However, the maintenance and management of most field devices are still in the corrective maintenance or traditional preventive maintenance stage. Under maintained or over maintained problems widely exist, which could cause devices fault and increase operation costs. Therefore, a device management platform is proposed for a safe and steady operation as well as fault diagnosis and predictive maintenance of EAST cryogenic system. This paper presents the function design and architecture design of the cryogenic device management platform. This platform is developed based on DeltaV DCS and acquires monitoring data through OPC protocol. It consists of three pillars, namely device information management, device condition management, and device performance monitoring. The development and implementation of every pillar are illustrated in detail in this paper. Test results and discussions are presented in the end.

  19. Curriculum Outline for Tennessee Transition Model.

    Science.gov (United States)

    Esch, B. J.

    This curriculum outline for the Sevier County, Tennessee, transition program for special needs students provides goals and objectives for the following domains: domestic, vocational, community functioning, and recreation/leisure. The domestic domain covers personal hygiene/grooming, first aid, home nursing, birth control/pregnancy, parenting, drug…

  20. 77 FR 60919 - Tennessee: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-10-05

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental..., Division of Solid Waste Management, 5th Floor, L & C Tower, 401 Church Street, Nashville, Tennessee 37243... RCRA hazardous waste management program. We granted authorization for changes to Tennessee's program on...

  1. Thermo-mechanical analysis of RMP coil system for EAST tokamak

    International Nuclear Information System (INIS)

    Wang, Songke; Ji, Xiang; Song, Yuntao; Zhang, Shanwen; Wang, Zhongwei; Sun, Youwen; Qi, Minzhong; Liu, Xufeng; Wang, Shengming; Yao, Damao

    2014-01-01

    Highlights: • Thermal design requirements for EAST RMP coils are summarized. • Cooling parameters based on both theoretical and numerical solutions are determined. • Compromise between thermal design and structural design is made on number of turns. • Thermo-mechanical calculations are made to validate its structural performance. - Abstract: Resonant magnetic perturbation (RMP) has been proved to be an efficient approach on edge localized modes (ELMs) control, resistive wall mode (RWM) control, and error field correction (EFC), RMP coil system under design in EAST tokamak will realize the above-mentioned multi-functions. This paper focuses on the thermo-mechanical analysis of EAST RMP coil system on the basis of sensitivity analysis, both normal and off-normal working conditions are considered. The most characteristic set of coil system is chosen with a complete modelling by means of three-dimensional (3D) finite element method, thermo-hydraulic and thermal-structural performances are investigated adequately, both locally and globally. The compromise is made between thermal performance and structural design requirements, and the results indicate that the optimized design is feasible and reasonable

  2. Ground-Water-Quality Data for Selected Wells in the Beaver Creek Watershed, West Tennessee

    National Research Council Canada - National Science Library

    Williams, Shannon D

    1996-01-01

    In 1993 the U.S. Geological Survey, in cooperation with the Tennessee Department of Environment and Conservation, began an investigation of the quality of ground water in the Beaver Creek watershed in West Tennessee...

  3. Technology Usage of Tennessee Agriculture Teachers

    Science.gov (United States)

    Coley, Michael D.; Warner, Wendy J.; Stair, Kristin S.; Flowers, James L.; Croom, D. Barry

    2015-01-01

    This study examined the accessibility and use of instructional technologies by agriculture teachers in Tennessee. Data were collected using a survey instrument to investigate teachers' adoption of technology, sources of acquired technology skills, accessibility and use of technological equipment, and barriers to technology integration. The study…

  4. Upgrade of the synchronous data management system of the EAST poloidal field power supply

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Lili; Huang, Liansheng, E-mail: huangls@ipp.ac.cn; Fu, Peng; Gao, Ge; He, Shiying

    2016-11-15

    Highlights: • The upgraded synchronous data management system of EAST poloidal field power supply supports long-pulse data storage. • Slice storage mechanism on MDSplus has been adopted for quasi real-time data storage. • The state machine has been adopted for managing the system sequencer. • IEEE-1588 protocol via Ethernet for the synchronization of clock signal was detailed described. - Abstract: Poloidal field (PF) power supply is an important subsystem of the Experimental Advanced Superconducting Tokamak (EAST). The upgrade of the PF control system of EAST is a great improvement over the original data management system which could not meet the requirements necessary for experiments on synchronization, modularity and sampling rate. In order to better analyze the power operation performance, the Synchronization Data Management System (SDMS) needs to be upgraded as well. This upgrade is based on distributed data acquisition and an MDSPLUS database. It consists of three data acquisition nodes synchronized by an reference clock from the EAST central timing system that also provides the start trigger of the EAST pulse. After being processed by a signal conditioning unit, experimental signals are digitized and written into the database in MDSPLUS format. Multi-channel, multi-tasking and continuous data storage have been achieved by using multi-threading technology on a Linux operation system. The SDMS has been used on the server in PF control system for the entire 2015 EAST campaign. The SDMS has had good performance during experiments and convenient human-machine interface to satisfy the requirements of all the experiments.

  5. Upgrade of the synchronous data management system of the EAST poloidal field power supply

    International Nuclear Information System (INIS)

    Zhu, Lili; Huang, Liansheng; Fu, Peng; Gao, Ge; He, Shiying

    2016-01-01

    Highlights: • The upgraded synchronous data management system of EAST poloidal field power supply supports long-pulse data storage. • Slice storage mechanism on MDSplus has been adopted for quasi real-time data storage. • The state machine has been adopted for managing the system sequencer. • IEEE-1588 protocol via Ethernet for the synchronization of clock signal was detailed described. - Abstract: Poloidal field (PF) power supply is an important subsystem of the Experimental Advanced Superconducting Tokamak (EAST). The upgrade of the PF control system of EAST is a great improvement over the original data management system which could not meet the requirements necessary for experiments on synchronization, modularity and sampling rate. In order to better analyze the power operation performance, the Synchronization Data Management System (SDMS) needs to be upgraded as well. This upgrade is based on distributed data acquisition and an MDSPLUS database. It consists of three data acquisition nodes synchronized by an reference clock from the EAST central timing system that also provides the start trigger of the EAST pulse. After being processed by a signal conditioning unit, experimental signals are digitized and written into the database in MDSPLUS format. Multi-channel, multi-tasking and continuous data storage have been achieved by using multi-threading technology on a Linux operation system. The SDMS has been used on the server in PF control system for the entire 2015 EAST campaign. The SDMS has had good performance during experiments and convenient human-machine interface to satisfy the requirements of all the experiments.

  6. 75 FR 27009 - Tennessee Disaster Number TN-00039

    Science.gov (United States)

    2010-05-13

    ..., Houston, Madison, Obion. Contiguous Counties: (Economic Injury Loans Only): Tennessee: Henry, Weakley... remains unchanged. (Catalog of Federal Domestic Assistance Numbers 59002 and 59008) James E. Rivera...

  7. 77 FR 50378 - Approval and Promulgation of Implementation Plans; Tennessee; Knoxville; Fine Particulate Matter...

    Science.gov (United States)

    2012-08-21

    ... protected. The www.regulations.gov Web site is an ``anonymous access'' system, which means EPA will not know... Inventory AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking... inventory portion of the State Implementation Plan (SIP) revision submitted by the State of Tennessee on...

  8. New Observatory at the University of Tennessee at Martin

    Science.gov (United States)

    Crews, Lionel J.; Chrysler, R.; Turner, K.

    2010-01-01

    A new observatory has been completed at the University of Tennessee at Martin and is now open for student research, local teacher training, and public outreach. The telescope is a 16" Meade RCT on a Software Bisque Paramount ME mount, 10' HomeDome, and SBIG CCD camera. The project endured many delays from a necessary change in housing from roll-top roof to dome, to the shutter blowing off in a heavy windstorm. This project was funded primarily by a Tennessee Math-Science Partnership grant (PI: Dr. Michael Gibson, UT Martin) directed at secondary teacher training in sciences.

  9. Opto-Mechanical systems design for polarimeter-interferometer on EAST

    Energy Technology Data Exchange (ETDEWEB)

    Zou, Z.Y. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui 230031 (China); University of Science and Technology of China, Hefei, Anhui 230026 (China); Liu, H.Q., E-mail: hqliu@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui 230031 (China); Ding, W.X.; Brower, D.L. [Department of Physics and Astronomy, University of California Los Angeles, Los Angeles, CA 90095 (United States); Li, W.M. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui 230031 (China); Lan, T. [University of Science and Technology of China, Hefei, Anhui 230026 (China); Zeng, L.; Yao, Y.; Yang, Y.; Jie, Y.X. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui 230031 (China)

    2016-11-15

    Highlights: • The POINT system has been designed double-pass horizontal 11-channel, and the probe beams are reflected by corner cube retro reflectors in the vacuum vessel for the first time. • ZEMAX calculations used to optimize the optical layout design are combined with the mechanical design from CATIA, providing a 3D visualization of the entire POINT system. • The massy, vibration isolation performance of optical table and optical tower are designed and vibration tested. - Abstract: An 11-channel Far-InfaRed (FIR) three-wave POlarimeter-INTerferometer (POINT) system has been successfully operated in 2015 EAST experimental campaign. For high accuracy measurement of POINT system, optimized optical system to reduce the stray light and crosstalk is very important. Optical design is done and improved by using ZEMAX software, in which spot size and energy distribution can be calculated in any position. The crosstalk and stray light can be reduced by optimized design of optical components and putting high extinction ratio materials in some key positions. Vibration isolation coefficient of optical platform is set to 90%. The optical platform and vibration isolation system are about 5 and 20 tons in weight respectively. To reduce vibration caused by the EAST hall, a more than 30 tons in weight stainless steel tower, filled with sand and mounted independent of the EAST machine, is constructed to ensure the stability of optics. Based on the optimized opto-mechanical design, the POINT system resolutions for Faraday rotation and line integral electron density measurements are 0.1° and 1 × 10{sup 16} m{sup −2}, respectively.

  10. 76 FR 32387 - Tennessee Disaster Number TN-00053

    Science.gov (United States)

    2011-06-06

    ... Only): Tennessee: Carroll, Haywood, Madison. All other information in the original declaration remains unchanged. (Catalog of Federal Domestic Assistance Numbers 59002 and 59008) James E. Rivera, Associate...

  11. 76 FR 33806 - Tennessee Disaster Number TN-00053

    Science.gov (United States)

    2011-06-09

    ... Only): Alabama: Limestone, Madison. Tennessee: Bedford, Franklin, Giles, Marshall, Moore. All other... 59002 and 59008) James E. Rivera, Associate Administrator for Disaster Assistance. [FR Doc. 2011-14274...

  12. Alternatives of Cross-Border Securities Settlement System in East Asia

    Directory of Open Access Journals (Sweden)

    Hee-Yul Chai

    2005-12-01

    Full Text Available The establishment of cross-border securities settlement system is a very important element of regional capital market integration. Despite its importance, relatively few arguments, both theoretical and practical, have been advanced on the subject. This paper aims to examine the alternatives of cross-border securities settlement system in East Asia, and analyse the feasibility and the advantages and disadvantages of each alternative. The paper underlines the need to develop a multi-currency DVP securities settlement system. The conceivable alternatives of East Asia's cross-border securities settlement system can be divided into decentralized system and centralized system. It is possible to consider a large array of institutional settings according to the depository/settlement methods. The comparison of the alternatives is based on economic efficiency, feasibility and institutional location of settlement system. In view of these criteria, it is argued that a 'big-bang' approach toward imperfectly cenralized system is the most desirable alternative.

  13. Liminality in Brian Friel’s Wonderful Tennessee

    Directory of Open Access Journals (Sweden)

    María Gaviña-Costero

    2013-03-01

    Full Text Available After the worldwide success of the 1990 play Dancing at Lughnasa, Brian Friel (Omagh, 1929, a playwright known for his search for new ways of dealing with his old preoccupations, created what many critics understood as a sequel to that play.Wonderful Tennessee, which premiered in 1993 at the Abbey Theatre, has been frequently considered Lughnasa’s younger and plainer sister. Whereas the seductiveness of the former cannot be denied, I intend to defend in this article the importance in Friel’s oeuvre of Wonderful Tennessee, a play rich in meaning and original in form that presents a complete rite of passage as described in Victor Turner’s anthropological studies. Friel unites elements that form part of ancient, Celtic and Christian rituals to show what has forever been humanity’s aim: the attainment of the absolute.

  14. Development and implementation of flowing liquid lithium limiter control system for EAST

    Energy Technology Data Exchange (ETDEWEB)

    Yuan, XiaoLin [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); University of Science and Technology of China, Hefei 230031 (China); Chen, Yue [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); Hu, JianSheng, E-mail: hujs@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); Li, JianGang; Zuo, GuiZhong; Ren, Jun; Zhou, Yue; Li, ChangZheng; Sun, Zheng; Xu, Wei; Meng, XianCai; Huang, Ming; Zheng, XingWei; Yao, Xingjia [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China)

    2016-11-15

    Highlights: • Development of a FLiLi remote control system for EAST. • Intelligent instruments are used to realize FLiLi remote control. • Good operating results of the control system were obtained in the EAST campaign. - Abstract: A control system of a flowing liquid lithium (FLiLi) limiter for the Experimental Advanced Superconducting Tokamak (EAST) was developed and implemented. The control system is not only able to control the direct current (DC) electromagnetic pump and heating power but can also set scanning parameters, receive the shot number, acquire the temperature, etc. The system consists of multifunctional LAN eXtensions for Instrumentation (LXI) instrument, temperature-acquisition module, programmable DC power supply, and programmable logic controller (PLC). The multi-range DC power supply is programmed to meet the operational requirements of the DC electromagnetic pump. The LXI instrument and temperature-acquisition module are used to obtain temperature data. The PLC is adopted to control the temperature of the FLiLi limiter. A safety interlock and protection function was developed for the FLiLi limiter control system. The software was designed by using LabVIEW to achieve data interaction between multiple protocols. The FLiLi limiter control system can acquire experimental data at a speed of 100 S/s and store it for later analysis. The control system was successfully applied to a FLiLi limiter to study the interaction between plasma and a fixed wall in the EAST campaign. This paper presents the framework, the implementation details, and results of the control system.

  15. 77 FR 8247 - Tennessee Gas Pipeline Company, L.L.C. Notice of Application

    Science.gov (United States)

    2012-02-14

    ... Pipeline Company, L.L.C. Notice of Application Take notice that on February 2, 2012, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in Docket... Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002, by telephone at (713) 420...

  16. 77 FR 43277 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2012-07-24

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on July 6, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed in the above referenced... Company, L.L.C. 1001 Louisiana Street, Houston, Texas 77002, or telephone (713) 420- 3299, or facsimile...

  17. YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT EAST-WEST DRIFT SYSTEM SAFETY ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    NA

    1999-06-08

    The purpose of this analysis is to systematically identify and evaluate hazards related to the design of the Yucca Mountain Project Exploratory Studies Facility (ESF) East-West Cross Drift. This analysis builds upon prior ESF System Safety Analyses and incorporates TS Main Drift scenarios, where applicable, into the East-West Drift scenarios. This System Safety Analysis (SSA) focuses on the personnel safety and health hazards associated with the engineered design of the East-West Drift. The analysis also evaluates other aspects of the East-West Drift, including purchased equipment (e.g., scientific mapping platform) or Systems/Structures/Components (SSCs) and out-of-tolerance conditions. In addition to recommending design mitigation features, the analysis identifies the potential need for procedures, training, or Job Safety Analyses (JSAs). The inclusion of this information in the SSA is intended to assist the organization(s) (e.g., constructor, Safety and Health, design) responsible for these aspects of the East-West Drift in evaluating personnel hazards and augment the information developed by these organizations. The SSA is an integral part of the systems engineering process, whereby safety is considered during planning, design, testing, and construction. A largely qualitative approach is used which incorporates operating experiences and recommendations from vendors, the constructor and the operating contractor. The risk assessment in this analysis characterizes the scenarios associated with East-West Drift SSCs in terms of relative risk and includes recommendations for mitigating all identified hazards. The priority for recommending and implementing mitigation control features is: (1) Incorporate measures to reduce risks and hazards into SSC designs. (2) Add safety features and capabilities to existing designs. (3) Develop procedures and conduct training to increase worker awareness of potential hazards, reduce exposure to hazards, and inform personnel of the

  18. Precipitation Change and Soil Leaching: Field Results and Simulations from Walker Branch Watershed, Tennessee

    Science.gov (United States)

    D.W. Johnson; P.J. Hanson; D.E. Todd; R.B. Susfalk; Carl C. Trettin

    1998-01-01

    Abstract. To investigate the potential effects of changing precipitation on a deciduous forest ecosystem, an experiment was established on Walker Branch Watershed, Tennessee that modified the amount of throughfall at 4 -33 %. ambient (no change), and +33 % using a system of rain gutters and sprinklers. We hypothesized that the drier treatments would...

  19. 77 FR 64972 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2012-10-24

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on October 10, 2012, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed in the above captioned docket an application pursuant to sections 7(b) and 7(c) of the Natural Gas Act (NGA) for a...

  20. Characterising East Antarctic Lithosphere and its Rift Systems using Gravity Inversion

    Science.gov (United States)

    Vaughan, Alan P. M.; Kusznir, Nick J.; Ferraccioli, Fausto; Leat, Phil T.; Jordan, Tom A. R. M.; Purucker, Michael E.; Golynsky, A. V. Sasha; Rogozhina, Irina

    2013-04-01

    Since the International Geophysical Year (1957), a view has prevailed that East Antarctica has a relatively homogeneous lithospheric structure, consisting of a craton-like mosaic of Precambrian terranes, stable since the Pan-African orogeny ~500 million years ago (e.g. Ferracioli et al. 2011). Recent recognition of a continental-scale rift system cutting the East Antarctic interior has crystallised an alternative view of much more recent geological activity with important implications. The newly defined East Antarctic Rift System (EARS) (Ferraccioli et al. 2011) appears to extend from at least the South Pole to the continental margin at the Lambert Rift, a distance of 2500 km. This is comparable in scale to the well-studied East African rift system. New analysis of RadarSat data by Golynsky & Golynsky (2009) indicates that further rift zones may form widely distributed extension zones within the continent. A pilot study (Vaughan et al. 2012), using a newly developed gravity inversion technique (Chappell & Kusznir 2008) with existing public domain satellite data, shows distinct crustal thickness provinces with overall high average thickness separated by thinner, possibly rifted, crust. Understanding the nature of crustal thickness in East Antarctica is critical because: 1) this is poorly known along the ocean-continent transition, but is necessary to improve the plate reconstruction fit between Antarctica, Australia and India in Gondwana, which will also better define how and when these continents separated; 2) lateral variation in crustal thickness can be used to test supercontinent reconstructions and assess the effects of crystalline basement architecture and mechanical properties on rifting; 3) rift zone trajectories through East Antarctica will define the geometry of zones of crustal and lithospheric thinning at plate-scale; 4) it is not clear why or when the crust of East Antarctica became so thick and elevated, but knowing this can be used to test models of

  1. Tennessee Oversight Agreement annual report, May 31, 1994--June 30, 1995

    International Nuclear Information System (INIS)

    1995-01-01

    The Tennessee Department of Environment and Conservation's DOE Oversight Division (TDEC/DOE-O) is responsible for assuring the citizens of Tennessee that their health, safety and environment on the Oak Ridge Reservation are protected and that appropriate remedial action is taken to provide this protection. TDEC/DOE-O has five program sections that reflect the organizational structure of the TDEC Bureau of Environment Divisions, as well as DOE's Environmental Safety and Health, Waste Management, and Environmental Restoration Programs

  2. An economic analysis of a monitored retrievable storage site for Tennessee. Final report and appendices

    Energy Technology Data Exchange (ETDEWEB)

    Fox, W.F.; Mayo, J.W.; Hansen, L.T.; Quindry, K.E.

    1985-12-17

    The United States Department of Energy is charged with the task of identifying potential sites for a Monitored Retrievable Storage (MRS) Facility and reporting the results of its analysis to Congress by January 1986. DOE chose three finalist sites from 11 sites DOE analysts evaluated earlier. All three are in Tennessee, including two in Oak Ridge and one in Trousdale/Smith Counties. This paper is a summary of research undertaken on the economic effects of establishing the MRS facility in Tennessee. All three locations were considered in the analysis, but on some occasions attention is focused on the site preferred by DOE. The research was undertaken by the Center for Business and Economic Research (CBER), College of Business Administration, the University of Tennessee, Knoxville, under contract with the Tennessee Department of Economic and Community Development.

  3. The height of Tennessee convicts: another piece of the "antebellum puzzle".

    Science.gov (United States)

    Sunder, Marco

    2004-03-01

    Average height of the free population in the United States born in the mid-1830s began to decline despite growing per capita incomes. Explanations for this "antebellum puzzle" revolve around a possibly deteriorating disease environment promoted by urban agglomeration and increases in the relative price of protein-rich foods. However, several groups were immune to the effect, including members of the middle class, whose income was high enough, and increased enough to overcome the adverse developments and maintain their nutritional status. Although at the opposite end of the social spectrum, the height of male slaves also increased, as it was in their owners' interest to raise their slaves' food allotments. The height of Tennessee convicts, analyzed in this article, also increased in the late-1830s, being the third exception to the "antebellum puzzle." Mid-19th century Tennessee was integrated into interstate commerce in cotton and tobacco and experienced considerable movement of people who would have brought with them diseases from elsewhere, hence, it would have been integrated into the US disease pool, and the fact that heights did not decline in the 1830s is therefore an indication that the antebellum puzzle cannot be explained exclusively by the spread of diseases. Yet, Tennessee's economy was quite different to that of the rest of the country. Although it did export live swine to the South, these exports did not increase during the antebellum decades. Hence, Tennessee remained self-sufficient in pork, and consumption of pork did not decline. Thus, the evidence presented here is consistent with the economic interpretation of the "antebellum puzzle": self-sufficiency in protein production protected even the members of the lower-classes of Tennessee from the negative externalities associated with the onset of industrialization.

  4. 76 FR 79673 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Science.gov (United States)

    2011-12-22

    ... Pipeline Company, L.L.C.; Notice of Application On December 9, 2011, Tennessee Gas Pipeline Company, L.L.C... (Commission) an application under section 7(c) of the Natural Gas Act (NGA), as amended, and part 157 of the... Rocan, Senior Counsel, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas...

  5. 76 FR 33805 - Tennessee Disaster Number TN-00055

    Science.gov (United States)

    2011-06-09

    ... State of Tennessee (FEMA-1979-DR), dated 05/09/2011. Incident: Severe Storms, Tornadoes, Straight-line, Winds, and Flooding. Incident Period: 04/19/2011 and continuing. Effective Date: 06/01/2011. Physical...

  6. Removal action report on the Building 3001 canal at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    Oak Ridge National Laboratory (ORNL) is a federal facility managed by Lockheed Martin C, Energy Research, Inc., for the U.S. Department of Energy (DOE). ORNL on the Oak Ridge Reservation in East Tennessee at the Anderson and Roane County lines, approximately 38 km (24 miles) west of Knoxville, Tennessee, and 18 km (11 miles) southwest of downtown Oak Ridge. The Oak Ridge Graphite Reactor and its storage and transfer canal are located in Bldg. 3001 in the approximate center of Waste Area Grouping I in the ORNL main complex. 4:1 The Bldg. 3001 Storage Canal is an L-shaped, underground, reinforced-concrete structure running from the back and below the Graphite Reactor in Bldg. 3001 to a location beneath a hot cell in the adjacent Bldg. 3019. The Graphite Reactor was built in 1943 to produce small quantities of plutonium and was subsequently used to produce other isotopes for medical research before it was finally shut down in 1963. The associated canal was used to transport, under water, spent fuel slugs and other isotopes from the back of the reactor to the adjacent Bldg. 31319 hot cell for further processing. During its operation and years subsequent to operation, the canal's concrete walls and floor became contaminated with radioisotopes from the water.This report documents the activities involved with replacing the canal water with a solid, controlled, low-strength material (CLSM) in response to a Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action

  7. Whole Genome DNA Sequence Analysis of Salmonella subspecies enterica serotype Tennessee obtained from related peanut butter foodborne outbreaks.

    Directory of Open Access Journals (Sweden)

    Mark R Wilson

    Full Text Available Establishing an association between possible food sources and clinical isolates requires discriminating the suspected pathogen from an environmental background, and distinguishing it from other closely-related foodborne pathogens. We used whole genome sequencing (WGS to Salmonella subspecies enterica serotype Tennessee (S. Tennessee to describe genomic diversity across the serovar as well as among and within outbreak clades of strains associated with contaminated peanut butter. We analyzed 71 isolates of S. Tennessee from disparate food, environmental, and clinical sources and 2 other closely-related Salmonella serovars as outgroups (S. Kentucky and S. Cubana, which were also shot-gun sequenced. A whole genome single nucleotide polymorphism (SNP analysis was performed using a maximum likelihood approach to infer phylogenetic relationships. Several monophyletic lineages of S. Tennessee with limited SNP variability were identified that recapitulated several food contamination events. S. Tennessee clades were separated from outgroup salmonellae by more than sixteen thousand SNPs. Intra-serovar diversity of S. Tennessee was small compared to the chosen outgroups (1,153 SNPs, suggesting recent divergence of some S. Tennessee clades. Analysis of all 1,153 SNPs structuring an S. Tennessee peanut butter outbreak cluster revealed that isolates from several food, plant, and clinical isolates were very closely related, as they had only a few SNP differences between them. SNP-based cluster analyses linked specific food sources to several clinical S. Tennessee strains isolated in separate contamination events. Environmental and clinical isolates had very similar whole genome sequences; no markers were found that could be used to discriminate between these sources. Finally, we identified SNPs within variable S. Tennessee genes that may be useful markers for the development of rapid surveillance and typing methods, potentially aiding in traceback efforts

  8. P2P-Based Data System for the EAST Experiment

    Science.gov (United States)

    Shu, Yantai; Zhang, Liang; Zhao, Weifeng; Chen, Haiming; Luo, Jiarong

    2006-06-01

    A peer-to-peer (P2P)-based EAST Data System is being designed to provide data acquisition and analysis support for the EAST superconducting tokamak. Instead of transferring data to the servers, all collected data are stored in the data acquisition subsystems locally and the PC clients can access the raw data directly using the P2P architecture. Both online and offline systems are based on Napster-like P2P architecture. This allows the peer (PC) to act both as a client and as a server. A simulation-based method and a steady-state operational analysis technique are used for performance evaluation. These analyses show that the P2P technique can significantly reduce the completion time of raw data display and real-time processing on the online system, and raise the workload capacity and reduce the delay on the offline system.

  9. Regional inventory of karst activity in the Valley and Ridge Province, eastern Tennessee: Phase 1

    International Nuclear Information System (INIS)

    Newton, J.G.; Tanner, J.M.

    1987-09-01

    A data collection form was developed for use in compiling information in the inventory. Information sources included files on subsidence, state and county highway departments, county agents and executives, soil conservation service representative, etc. Data obtained included location, date of occurrence, number of subsidence features at the reported site, size, topographic setting, geologic setting, and probable causative factors. The regional inventory obtained information on over 300 historic subsidence events at more than 200 sites in East Tennessee. Areas having the greatest areal density of active subsidence include Hamblen, Jefferson, and Loudon Counties. Reported subsidence events occurred between 1945 and 1986. The Knox Group dolomites account for about two-thirds of all reported sinkholes in the inventory. Most of the karst activity occurs in valleys or flat areas. In cases where causative factors could be established, the combination of surface water drainage alteration or impoundment combined with soil disturbance associated with construction activity were most often precursors to subsidence. 54 refs., 10 figs., 4 tabs

  10. Tennessee Army National Guard (TNARNG) Range Expansion at Arnold Air Force Base, Tennessee. Environmental Assessment

    Science.gov (United States)

    2012-11-01

    Ecological Services Field Office for the U.S. Fish and Wildlife Service (USFWS). The Tennessee Historical Commission, State Historic Preservation Office...Alternate) 12 SEAVAN sites Prefabricated – no new construction required CACTF (Primary) Road network 0 1,800 n/a n/a Gravel pads for pre-fab...management to prevent undesirable ecosystem changes. Recognizing the ecological NOVEMBER 2012 | EA_2013_TNARNG_Range_Expansion Page 3-6 and economic

  11. EAST machine assembly and its measurement system

    International Nuclear Information System (INIS)

    Wu, S.T.

    2005-01-01

    The EAST (HT-7U) superconducting tokamak consists of a superconducting poloidal field magnet system, a toroidal field magnet system, a vacuum vessel and in-vessel components, thermal shields and a cryostat vessel. The main parts of the machine have been delivered to ASIPP (Institute of Plasma Physics, Chinese Academy of Sciences) successionally from 2003. For its complicated constitution and precise requirement, a reasonable assembly procedure and measurement technique should be defined carefully. Before the assembly procedure, a reference frame has been set up with reference fiducial targets on the wall of the test hall by an industrial measurement system. After the torus of TF coils is formed, a new reference frame will be set up from the position of the TF torus. The vacuum vessel with all inner parts will be installed with reference of the new reference frame. The big size and mass of components, special configuration of the superconducting machine with tight installation tolerances of the HT-7U (EAST) machine result in complicated assembly procedure. The procedure had begun with the installation of the support frame and the base of cryostat vessel last year. In this paper, the requirements of the assembly precise for some key components of the machine are described. The reference frame for the assembly and maintenance is explained. The assembly procedure is introduced

  12. Athens automation and control experiment project review meeting, Knoxville, Tennessee, December 3-5, 1985

    Energy Technology Data Exchange (ETDEWEB)

    Braithwait, S.D.; Broadaway, E.R.; Fortson, N.D.; Gellings, C.W.; Hu, P.S.; Lawler, J.S.; Markel, L.C.; McKinley, K.F.; Monteen, L.D.; Newton, B.K.

    1986-08-01

    The AACE is an electric power distribution automation project involving research and development of both hardware and software. Equipment for the project is being installed on the electric distribution system in Athens, Tennessee. Purposes of the AACE are to develop and test load control, volt/var control, and system reconfiguration capabilities on an electric distribution system and to transfer what is learned to the electric utility industry. Expected benefits include deferral of costly power generation plants and increased electric service reliability.

  13. The design of data storage system based on Lustre for EAST

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Feng, E-mail: wangfeng@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Chen, Ying; Li, Shi [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Yang, Fei [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Department of Computer Science, Anhui Medical University, Hefei, Anhui (China); Xiao, Bingjia [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); School of Nuclear Science and Technology, University of Science and Technology of China, Hefei, Anhui (China)

    2016-11-15

    Highlights: • A high performance data storage system based on Lustre and InfiniBand network has been designed and implemented on EAST tokamak. • The acquired data are stored into MDSplus database continuously on Lustre storage system during discharge. • The high performance computing clusters are interconnected with data acquisition and storage system by Lustre and InfiniBand network. - Abstract: The quasi-steady state operation is one of the main purposes of EAST tokamak, and more than 400 s discharge pulse has been achieved in the past campaigns. The acquired data amount increases continuously with the discharge length. At the same time to meet the requirement of the upgrade and improvement of the diagnostic systems, more and more data acquisition channels have come into service. Some new diagnostic systems require high sampling rate data acquisition more than 10MSPS. In the last campaign 2014, the data streaming is about 2000MB/s and the total data amount is more than 100TB. How to store the huge data continuously becomes a big problem. A new data storage system based on Lustre has been designed to solve the problem. All the storage nodes and servers are connected to InfiniBand FDR 56Gbps network. The maximum parallel throughput of the total storage system is about 10GB/s. It is easy to expand the storage system by adding I/O nodes when more capacity and performance are required in the future. The new data storage system will be applied in the next campaign of EAST. The system details are given in the paper.

  14. The design of data storage system based on Lustre for EAST

    International Nuclear Information System (INIS)

    Wang, Feng; Chen, Ying; Li, Shi; Yang, Fei; Xiao, Bingjia

    2016-01-01

    Highlights: • A high performance data storage system based on Lustre and InfiniBand network has been designed and implemented on EAST tokamak. • The acquired data are stored into MDSplus database continuously on Lustre storage system during discharge. • The high performance computing clusters are interconnected with data acquisition and storage system by Lustre and InfiniBand network. - Abstract: The quasi-steady state operation is one of the main purposes of EAST tokamak, and more than 400 s discharge pulse has been achieved in the past campaigns. The acquired data amount increases continuously with the discharge length. At the same time to meet the requirement of the upgrade and improvement of the diagnostic systems, more and more data acquisition channels have come into service. Some new diagnostic systems require high sampling rate data acquisition more than 10MSPS. In the last campaign 2014, the data streaming is about 2000MB/s and the total data amount is more than 100TB. How to store the huge data continuously becomes a big problem. A new data storage system based on Lustre has been designed to solve the problem. All the storage nodes and servers are connected to InfiniBand FDR 56Gbps network. The maximum parallel throughput of the total storage system is about 10GB/s. It is easy to expand the storage system by adding I/O nodes when more capacity and performance are required in the future. The new data storage system will be applied in the next campaign of EAST. The system details are given in the paper.

  15. Safety evaluation report related to operation of Sequoyah Nuclear Plant, Units 1 and 2, Docket nos. 50-327 and 50-328, Tennessee Valley Authority

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1979-03-01

    A safety evaluation of the Tennessee Valley Authority's application for a license to operate its Sequoyah Nuclear Plant, Units 1 and 2, located in Hamilton County, Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. It consists of a technical review and staff evaluation of applicant information on: (1) population density, land use, and physical characteristics of the site area; (2) design, fabrication, construction, testing criteria, and performance characteristics of plant structures, systems, and components important to safety; (3) expected response of the facility to anticipated operating transients, and to postulated design basis accidents; (4) applicant engineering and construction organization, and plans for the conduct of plant operations; and (5) design criteria for a system to control the plant's radiological effluents. The staff has concluded that the plant can be operated by the Tennessee Valley Authority without endangering the health and safety of the public provided that the outstanding matters discussed in the report are favorably resolved. (author)

  16. 1996 structural integrity assessments for the Category C Liquid Low-Level Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    This document provides a report of the efforts made to satisfy the Federal Facility Agreement for the structural integrity certification of ten Category C Liquid Low Level Waste (LLLW) tank systems on the Oak Ridge Reservation in Oak Ridge, Tennessee. Within this document, each Category C tank system is described including the associated pipeline segments evaluated as a part of those tank systems. A separate structural integrity assessment was conducted for each of the LLLW Tank Systems, four of which are located in Melton Valley, and six of which are located in Bethel Valley. The results of the structural integrity assessments are reported herein. The assessments are based on (1) a review of available tank design drawings, (2) a qualitative assessment of corrosion on the tank and pipelines, and primarily (3) leak testing program results

  17. 1996 structural integrity assessments for the Category C Liquid Low-Level Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    This document provides a report of the efforts made to satisfy the Federal Facility Agreement for the structural integrity certification of ten Category C Liquid Low Level Waste (LLLW) tank systems on the Oak Ridge Reservation in Oak Ridge, Tennessee. Within this document, each Category C tank system is described including the associated pipeline segments evaluated as a part of those tank systems. A separate structural integrity assessment was conducted for each of the LLLW Tank Systems, four of which are located in Melton Valley, and six of which are located in Bethel Valley. The results of the structural integrity assessments are reported herein. The assessments are based on (1) a review of available tank design drawings, (2) a qualitative assessment of corrosion on the tank and pipelines, and primarily (3) leak testing program results.

  18. Design of a real-time fault diagnosis expert system for the EAST cryoplant

    International Nuclear Information System (INIS)

    Zhou Zhiwei; Zhuang Ming; Lu Xiaofei; Hu Liangbing; Xia Genhai

    2012-01-01

    Highlights: ► An expert system of real-time fault diagnosis for EAST cryoplant is designed. ► Knowledge base is built via fault tree analysis based on our fault experience. ► It can make up the deficiency of safety monitoring in cryogenic DCS. ► It can help operators to find the fault causes and give operation suggestion. ► It plays a role of operators training in certain degree. - Abstract: The EAST cryoplant consists of a 2 kW/4 K helium refrigerator and a helium distribution system. It is a complex process system which involves many process variables and cryogenic equipments. Each potential fault or abnormal event may influence stability and safety of the cryogenic system, thereby disturbing the fusion experiment. The cryogenic control system can monitor the process data and detect process alarms, but it is difficult to effectively diagnose the fault causes and provide operation suggestions to operators when anomalies occur. Therefore, a real-time fault diagnosis expert system is essential for a safe and steady operation of EAST cryogenic system. After a brief description of the EAST cryoplant and its control system, the structure design of the cryogenic fault diagnosis expert system is proposed. Based on the empirical knowledge, the fault diagnosis model is built adopting fault tree analysis method which considers the uncertainty. The knowledge base and the inference machine are presented in detail. A cross-platform integrated development environment Qt Creator and MySQL database have been used to develop the system. The proposed expert system has a fine graphic user interface for monitoring and operation. Preliminary test was conducted and the results found to be satisfactory.

  19. Design and construction of vacuum control system on EAST

    International Nuclear Information System (INIS)

    Wang, L.; Zhang, Y.; Hu, Q.S.; Wang, X.M.; Zhang, X.D.; Hu, J.S.; Yang, Y.; Gu, X.M.

    2008-01-01

    The construction of experimental advanced superconducting tokamak (EAST) was finished at the end of 2006 in Hefei, China. Its vacuum system, an important subsystem, has been commissioned in February 2006. The design and construction of this vacuum control system are described in this paper. The requirements for remote automation, distributed control and centralized management, high reliability and expansibility have been taken into account in the design. There are three levels of control in vacuum control system. The bottom level control is performed on the local instruments manually; the medium level control is based on Siemens S7-400 PLC; the top level control is conducted on IPCs with communication through profi b us network. In addition remote handling and centralized monitoring could be realized by a remote control server. The control system could achieve pumping and fueling of the whole vacuum system. Besides that, it also includes the data acquisition of the pressure and temperature. The details are discussed on the monitoring of vacuum system states including cooling water, power and compressed air, etc., safeguards of plasma chamber and cryostat chamber and vacuum equipments, choosing of control modes corresponding to the plasma discharge and wall conditioning. At the end, the parts of EAST device protection system related to vacuum and gas injection system will also be introduced

  20. Empirical analysis of the solar incentive policy for Tennessee solar value chain

    International Nuclear Information System (INIS)

    Sawhney, Rapinder; Thakur, Kaveri; Venkatesan, Bharadwaj; Ji, Shuguang; Upreti, Girish; Sanseverino, John

    2014-01-01

    Highlights: • Tennessee solar value chain (TNSVC) is modeled to analyze effect of policy on demand. • TNSVC model replicates realistic scenarios to gauge the economic impact on state. • Simulation study determines that the TNSVC capacity is greater than demand. • Direct cash incentives have greater impact on demand than indirect incentives. • The model portrays a holistic approach to assist strategic energy policy analysis. - Abstract: The market for solar energy in the US has grown exponentially due to increased consumer demand resulting from price reduction via economies of scale, technological progress, and a variety of incentives from federal and state governments as well as utility companies. The installation of solar power in Tennessee has more than doubled each year from 2009 to 2011. In this paper, we focus on the behavior of the Tennessee Solar Value Chain (TNSVC) to study the factors that influence growth of solar industry in the state. The impact of existing incentives on the TNSVC is analyzed. The TNSVC is simulated based on inputs from on-site survey to estimate economic impact in terms of the number of jobs added and the tax revenue generated in the state. In addition, a sensitivity analysis for the impact on the TNSVC under different policies those may be adopted by the state of Tennessee in the future is conducted. This paper employs a holistic model which can predict PV installation demand, understand solar value chain capacity, and estimate the revenue generation. It should be noted that the method employed in this study is not unique to the solar energy industry in Tennessee. The data utilized in this study is a combination of public domain information and surveys of suppliers, manufacturers, distributors, and installers. This makes the model in this paper flexible enough to be applied to assess the solar value chain in other state or country

  1. 78 FR 63148 - Approval and Promulgation of Implementation Plans; Tennessee; Bristol; 2010 Lead Base Year...

    Science.gov (United States)

    2013-10-23

    ... Tennessee, through the Tennessee Department of Environment and Conservation (TDEC) on April 11, 2013. The... per year within the Bristol Area is Exide Technologies Facility, a lead acid battery manufacturing and recycling facility which processes lead and reclaimed lead into batteries for the auto industry. Pursuant to...

  2. Operational present status and reliability analysis of the upgraded EAST cryogenic system

    Science.gov (United States)

    Zhou, Z. W.; Y Zhang, Q.; Lu, X. F.; Hu, L. B.; Zhu, P.

    2017-12-01

    Since the first commissioning in 2005, the cryogenic system for EAST (Experimental Advanced Superconducting Tokamak) has been cooled down and warmed up for thirteen experimental campaigns. In order to promote the refrigeration efficiencies and reliability, the EAST cryogenic system was upgraded gradually with new helium screw compressors and new dynamic gas bearing helium turbine expanders with eddy current brake to improve the original poor mechanical and operational performance from 2012 to 2015. Then the totally upgraded cryogenic system was put into operation in the eleventh cool-down experiment, and has been operated for the latest several experimental campaigns. The upgraded system has successfully coped with various normal operational modes during cool-down and 4.5 K steady-state operation under pulsed heat load from the tokamak as well as the abnormal fault modes including turbines protection stop. In this paper, the upgraded EAST cryogenic system including its functional analysis and new cryogenic control networks will be presented in detail. Also, its operational present status in the latest cool-down experiments will be presented and the system reliability will be analyzed, which shows a high reliability and low fault rate after upgrade. In the end, some future necessary work to meet the higher reliability requirement for future uninterrupted long-term experimental operation will also be proposed.

  3. Tennessee Higher Education Fact Book: 2015-2016

    Science.gov (United States)

    Tennessee Higher Education Commission, 2016

    2016-01-01

    In January 2010, the General Assembly passed the Complete College Tennessee Act (CCTA), a comprehensive reform agenda that seeks to transform public higher education through changes in academic, fiscal and administrative policies at the state and institutional level. While the higher education landscape has been shaped by the CCTA, higher…

  4. An aerial radiological survey of the Oak Ridge Reservation, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Maurer, R.J.

    1993-04-01

    An aerial radiological survey of the Oak Ridge Reservation (ORR) and surrounding area in Oak Ridge, Tennessee, was conducted during the period March 30 to April 14,1992. The purpose of the survey was to measure and document the terrestrial radiological environment of the Oak Ridge Reservation for use in environmental management programs and emergency response planning. The aerial survey was flown at an altitude of 150 feet (46 meters) along a series of parallel lines 250 feet (76 meters) apart and included X-10 (Oak Ridge National Laboratory), K-25 (former Gaseous Diffusion Plant), Y-12 (Weapons Production Plant), the Freels Bend Area and Oak Ridge Institute for Science and Education, the East Fork Poplar Creek (100-year floodplain extending from K-25 to Y-12), Elza Gate (former uranium ore storage site located in the city of Oak Ridge), Parcel A, the Clinch River (river banks extending from Melton Hill Dam to the city of Kingston), and the CSX Railroad Tracks (extending from Y-12 to the city of Oak Ridge). The survey encompassed approximately 55 square miles (1 41 square kilometers) of the Oak Ridge Reservation and surrounding area

  5. Design demonstrations for Category B tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-07-01

    This document presents design demonstrations conducted of liquid low-level waste (LLLW) storage tank systems located at the Oak Ridge National Laboratory (ORNL). ORNL has conducted research in energy related fields since 1943. The facilities used to conduct the research include nuclear reactors, chemical pilot plants, research laboratories, radioisotope production laboratories, and support facilities. These facilities have produced a variety of radioactive and/or hazardous wastes. These wastes have been stored and transported through an extensive network of piping and tankage. Demonstration of the design of these tank systems has been stipulated by the Federal Facility Agreement (FFA) between the US Environmental Protection Agency (EPA) - Region IV; the Tennessee Department of Environment and Conservation (TDEC); and the DOE. The FFA establishes four categories of tanks. These are: Category A -- New or Replacement Tank Systems with Secondary Containment; Category B -- Existing Tank Systems with Secondary Containment; Category C -- Existing Tank Systems without Secondary Containment; and Category D -- Existing Tank Systems without Secondary Containment that are; Removed from Service. This document provides a design demonstration of the secondary containment and ancillary equipment of 11 tank systems listed in the FFA as Category ''B.'' The design demonstration for each tank is presented in Section 2. The design demonstrations were developed using information obtained from the design drawings (as-built when available), construction specifications, and interviews with facility operators. The assessments assume that each tank system was constructed in accordance with the design drawings and construction specifications for that system unless specified otherwise. Each design demonstration addresses system conformance to the requirements of the FFA (Appendix F, Subsection C)

  6. School Principals' Sources of Knowledge

    Science.gov (United States)

    Perkins, Arland Early

    2014-01-01

    The purpose of this study was to determine what sources of professional knowledge are available to principals in 1 rural East Tennessee school district. Qualitative research methods were applied to gain an understanding of what sources of knowledge are used by school principals in 1 rural East Tennessee school district and the barriers they face…

  7. DARA Solid Storage Facility evaluation and recommendations, Y-12 Bear Creek Burial Grounds, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Barton, W.D. III; Hughey, J.C.

    1992-08-01

    The Disposal Area Remedial Action (DARA) Solid Storage Facility (SSF) is a rectangular concrete vault with two high-density Polyethlene (HDPE) liners and covered with a metal building. The SSF was originally designed and constructed to receive saturated sediments from the excavation of the Oil Retention Ponds and Tributary 7 at the Oak Ridge Y-12 Plant. The sediments placed in the SSF were generally high-water-content soils contaminated with polychlorinated biphenyls (PCBs) and volatile organic carbons. The facility was intended to dewater the sediments by allowing the free water to percolate to a 6-in. sand layer covering the entire floor of the facility. The sand layer then drained into sumps located at the east and west ends of the facility. An application for a Part-B Permit was submitted to the state of Tennessee in February 1992 (MMES 1992a). This report is being submitted to support approval of that permit application and to address certain issues known to the regulators regarding this facility

  8. Storm water control plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This document provides the Environmental Restoration Program with information about the erosion and sediment control, storm water management, maintenance, and reporting and record keeping practices to be employed during Phase II of the remediation project for the Lower East Fork Poplar Creek (LEFPC) Operable Unit

  9. Millimeter-wave imaging diagnostics systems on the EAST tokamak (invited)

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Y. L.; Xie, J. L., E-mail: jlxie@ustc.edu.cn; Yu, C. X.; Zhao, Z. L.; Gao, B. X.; Chen, D. X.; Liu, W. D.; Liao, W.; Qu, C. M.; Luo, C. [School of Physics, University of Science and Technology of China, Anhui 230026 (China); Hu, X.; Spear, A. G.; Luhmann, N. C.; Domier, C. W.; Chen, M.; Ren, X. [University of California, Davis, California 95616 (United States); Tobias, B. J. [Princeton Plasma Physics Laboratory, Princeton, New Jersey 08543 (United States)

    2016-11-15

    Millimeter-wave imaging diagnostics, with large poloidal span and wide radial range, have been developed on the EAST tokamak for visualization of 2D electron temperature and density fluctuations. A 384 channel (24 poloidal × 16 radial) Electron Cyclotron Emission Imaging (ECEI) system in F-band (90-140 GHz) was installed on the EAST tokamak in 2012 to provide 2D electron temperature fluctuation images with high spatial and temporal resolution. A co-located Microwave Imaging Reflectometry (MIR) will be installed for imaging of density fluctuations by December 2016. This “4th generation” MIR system has eight independent frequency illumination beams in W-band (75-110 GHz) driven by fast tuning synthesizers and active multipliers. Both of these advanced millimeter-wave imaging diagnostic systems have applied the latest techniques. A novel design philosophy “general optics structure” has been employed for the design of the ECEI and MIR receiver optics with large aperture. The extended radial and poloidal coverage of ECEI on EAST is made possible by innovations in the design of front-end optics. The front-end optical structures of the two imaging diagnostics, ECEI and MIR, have been integrated into a compact system, including the ECEI receiver and MIR transmitter and receiver. Two imaging systems share the same mid-plane port for simultaneous, co-located 2D fluctuation measurements of electron density and temperature. An intelligent remote-control is utilized in the MIR electronics systems to maintain focusing at the desired radial region even with density variations by remotely tuning the probe frequencies in about 200 μs. A similar intelligent technique has also been applied on the ECEI IF system, with remote configuration of the attenuations for each channel.

  10. Conceptual design of EAST multi-purpose maintenance deployer system

    International Nuclear Information System (INIS)

    Pan, Hongtao; He, Kaihui; Cheng, Yong; Song, Yuntao; Yang, Yang; Villedieu, Eric; Shi, Shanshuang; Yang, Songzhu

    2017-01-01

    Highlights: • A redundant 11-DOF articulated robot for EAST in-vessel maintenance is presented. • A new modular joint developed to optimize the yaw joint actuator for the robot is described. • A 3-DOF gripper integrated with cameras and torque sensor is developed. - Abstract: EAST multi-purpose maintenance deployer (EMMD) system, being collaboratively developed by ASIPP and CEA-IRFM, is built as upgrades for EAMA. Updated kinematics parameters such as DOF distribution and joint angle for EMMD robot are performed and verified in a simulation platform. A new modular joint has been developed to optimize the yaw joint actuator for easy assembly and flexibility reduction. A 3-DOF gripper with cameras and torque sensor has been designed to provide inspection and dexterous handling of small fragments inside the EAST chamber. A conceptual upgrade for EAMA-CASK has been developed for the purpose of protecting the end-effector's sensors which do not have temperature-resistant qualification. The high temperature and vacuum compatible solutions and validation experiments have been presented in this paper.

  11. Conceptual design of EAST multi-purpose maintenance deployer system

    Energy Technology Data Exchange (ETDEWEB)

    Pan, Hongtao [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China); University of Science and Technology of China, Hefei, Anhui 230022 (China); He, Kaihui, E-mail: hekh@iterchina.cn [China International Nuclear Fusion Energy Program Execution Center, Beijing 100862 (China); Cheng, Yong [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China); Song, Yuntao [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China); University of Science and Technology of China, Hefei, Anhui 230022 (China); Yang, Yang [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China); Villedieu, Eric [CEA-IRFM, F-13108 Saint-Paul-Lez-Durance (France); Shi, Shanshuang; Yang, Songzhu [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China)

    2017-05-15

    Highlights: • A redundant 11-DOF articulated robot for EAST in-vessel maintenance is presented. • A new modular joint developed to optimize the yaw joint actuator for the robot is described. • A 3-DOF gripper integrated with cameras and torque sensor is developed. - Abstract: EAST multi-purpose maintenance deployer (EMMD) system, being collaboratively developed by ASIPP and CEA-IRFM, is built as upgrades for EAMA. Updated kinematics parameters such as DOF distribution and joint angle for EMMD robot are performed and verified in a simulation platform. A new modular joint has been developed to optimize the yaw joint actuator for easy assembly and flexibility reduction. A 3-DOF gripper with cameras and torque sensor has been designed to provide inspection and dexterous handling of small fragments inside the EAST chamber. A conceptual upgrade for EAMA-CASK has been developed for the purpose of protecting the end-effector's sensors which do not have temperature-resistant qualification. The high temperature and vacuum compatible solutions and validation experiments have been presented in this paper.

  12. Design of a real-time fault diagnosis expert system for the EAST cryoplant

    Energy Technology Data Exchange (ETDEWEB)

    Zhou Zhiwei, E-mail: zzw@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Zhuang Ming, E-mail: zhm@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Lu Xiaofei, E-mail: luxf1212@mail.ustc.edu.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Hu Liangbing, E-mail: huliangbing@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Xia Genhai, E-mail: xgh@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China)

    2012-12-15

    Highlights: Black-Right-Pointing-Pointer An expert system of real-time fault diagnosis for EAST cryoplant is designed. Black-Right-Pointing-Pointer Knowledge base is built via fault tree analysis based on our fault experience. Black-Right-Pointing-Pointer It can make up the deficiency of safety monitoring in cryogenic DCS. Black-Right-Pointing-Pointer It can help operators to find the fault causes and give operation suggestion. Black-Right-Pointing-Pointer It plays a role of operators training in certain degree. - Abstract: The EAST cryoplant consists of a 2 kW/4 K helium refrigerator and a helium distribution system. It is a complex process system which involves many process variables and cryogenic equipments. Each potential fault or abnormal event may influence stability and safety of the cryogenic system, thereby disturbing the fusion experiment. The cryogenic control system can monitor the process data and detect process alarms, but it is difficult to effectively diagnose the fault causes and provide operation suggestions to operators when anomalies occur. Therefore, a real-time fault diagnosis expert system is essential for a safe and steady operation of EAST cryogenic system. After a brief description of the EAST cryoplant and its control system, the structure design of the cryogenic fault diagnosis expert system is proposed. Based on the empirical knowledge, the fault diagnosis model is built adopting fault tree analysis method which considers the uncertainty. The knowledge base and the inference machine are presented in detail. A cross-platform integrated development environment Qt Creator and MySQL database have been used to develop the system. The proposed expert system has a fine graphic user interface for monitoring and operation. Preliminary test was conducted and the results found to be satisfactory.

  13. Design demonstrations for the remaining 19 Category B tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-01-01

    This document presents design demonstrations conducted of liquid low-level waste (LLLW) storage tank systems located at the Oak Ridge National Laboratory (ORNL). Demonstration of the design of these tank systems has been stipulated by the Federal Facility Agreement (FFA) between the US Environmental Protection Agency (EPA)--Region IV; the Tennessee Department of Environment and Conservation (TDEC); and the DOE. The FFA establishes four categories of tank systems: Category A--New or Replacement Tank Systems with Secondary Containment; Category B--Existing Tank Systems with Secondary Containment; Category C--Existing Tank Systems Without Secondary Containment; and Category D--Existing Tank Systems Without Secondary Containment That are Removed from Service. This document provides a design demonstration of the secondary containment and ancillary equipment of 19 tank systems listed in the FFA as Category B. Three tank systems originally designated as Category B have been redesignated as Category C and one tank system originally designated as Category B has been redesignated as Category D. The design demonstration for each tank is presented in Section 2. The design demonstrations were developed using information obtained from the design drawings (as-built when available), construction specifications, and interviews with facility operators. The assessments assume that each tank system was constructed in accordance with the design drawings and construction specifications for that system unless specified otherwise. Each design demonstration addresses system conformance to the requirements of the FFA

  14. Safety evaluation report related to the operation of Sequoyah Nuclear Plant, Units 1 and 2, Docket Nos. 50-327 and 50-328, Tennessee Valley Authority

    International Nuclear Information System (INIS)

    1982-12-01

    Supplement No. 6 to the Safety Evaluation Report (SER) related to the operation of the Tennessee Valley Authority's Sequoyah Nuclear Plant, Units 1 and 2, located in Hamilton County, Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The purpose of this supplement is to update the staff's evaluations of the issues related to the hydrogen mitigation system identified in the SER and previous supplements as needing resolution

  15. The web-based user interface for EAST plasma control system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, R.R., E-mail: rrzhang@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Anhui (China); Xiao, B.J. [Institute of Plasma Physics, Chinese Academy of Sciences, Anhui (China); School of Nuclear Science and Technology, University of Science and Technology of China, Anhui (China); Yuan, Q.P. [Institute of Plasma Physics, Chinese Academy of Sciences, Anhui (China); Yang, F. [Institute of Plasma Physics, Chinese Academy of Sciences, Anhui (China); Department of Computer Science, Anhui Medical University, Anhui (China); Zhang, Y. [Institute of Plasma Physics, Chinese Academy of Sciences, Anhui (China); Johnson, R.D.; Penaflor, B.G. [General Atomics, DIII-D National Fusion Facility, San Diego, CA (United States)

    2014-05-15

    The plasma control system (PCS) plays a vital role at EAST for fusion science experiments. Its software application consists of two main parts: an IDL graphical user interface for setting a large number of plasma parameters to specify each discharge, several programs for performing the real-time feedback control and managing the whole control system. The PCS user interface can be used from any X11 Windows client with privileged access to the PCS computer system. However, remote access to the PCS system via the IDL user interface becomes an extreme inconvenience due to the high network latency to draw or operate the interfaces. In order to realize lower latency for remote access to the PCS system, a web-based system has been developed for EAST recently. The setup data are retrieved from the PCS system and client-side JavaScript draws the interfaces into the user's browser. The user settings are also sent back to the PCS system for controlling discharges. These technologies allow the web-based user interface to be viewed by authorized users with a web browser and have it communicate with PCS server processes directly. It works together with the IDL interface and provides a new way to aid remote participation.

  16. The web-based user interface for EAST plasma control system

    International Nuclear Information System (INIS)

    Zhang, R.R.; Xiao, B.J.; Yuan, Q.P.; Yang, F.; Zhang, Y.; Johnson, R.D.; Penaflor, B.G.

    2014-01-01

    The plasma control system (PCS) plays a vital role at EAST for fusion science experiments. Its software application consists of two main parts: an IDL graphical user interface for setting a large number of plasma parameters to specify each discharge, several programs for performing the real-time feedback control and managing the whole control system. The PCS user interface can be used from any X11 Windows client with privileged access to the PCS computer system. However, remote access to the PCS system via the IDL user interface becomes an extreme inconvenience due to the high network latency to draw or operate the interfaces. In order to realize lower latency for remote access to the PCS system, a web-based system has been developed for EAST recently. The setup data are retrieved from the PCS system and client-side JavaScript draws the interfaces into the user's browser. The user settings are also sent back to the PCS system for controlling discharges. These technologies allow the web-based user interface to be viewed by authorized users with a web browser and have it communicate with PCS server processes directly. It works together with the IDL interface and provides a new way to aid remote participation

  17. Web-based Logbook System for EAST Experiments

    International Nuclear Information System (INIS)

    Yang Fei; Xiao Bingjia

    2010-01-01

    Implementation of a web-based logbook system on EAST is introduced, which can store the comments for the experiments into a database and access the documents via various web browsers. The three-tier software architecture and asynchronous access technology are adopted to improve the system effectively. Authorized users can view the information of real-time discharge, comments from others and signal plots; add, delete, or revise their own comments; search signal data or comments under complicated search conditions; and collect relevant information and output it to an excel file. The web pages can be automatically updated after a new discharge is completed and without refreshment.

  18. Progress of high power and long pulse ECRH system in EAST

    International Nuclear Information System (INIS)

    Wang, Xiaojie; Liu, Fukun; Shan, Jiafang; Xu, Handong; DajunWu; Li, Bo; Wei, Wei; Zhang, Jian; Huang, Yiyun; Tang, Yunying; Xu, Weiye; Hu, Huaichuan; Wang, Jian; Xu, Li; Zhang, Liyuan; Feng, Jianqiang

    2015-01-01

    Highlights: • The design and the status of the 140 GHz/4 MW/1000 s ECRH system on EAST tokamak is described in detail. • Two of the four gyrotrons are tested in factory. • The transmission line and the equatorial launcher for the first 2 MW system are ready for installation. • Series tests have been carried out for the most critical elements for the real-time launcher. • The auxiliary system includes the water cooling system, the HVPS system, the vacuum system have been installed and tested. - Abstract: In accordance with the long pulse objectives of the Experimental Advanced Superconducting Tokamak (EAST), an electron cyclotron resonance heating (ECRH) system with the feature of 4 MW power for a pulse length up to 1000 s at 140 GHz, using second harmonic of the extraordinary mode (X2) is presently under construction at the institute of plasma physics, Chinese academy of sciences (ASIPP). The missions of the system are to provide central heating, current drive, plasma profile tailoring and control of magneto-hydrodynamic (MHD) instabilities. The continuous wave (CW) power is transmitted from the gyrotrons to EAST via low-loss evacuated waveguide transmission lines. Considering the diverse applications of the EC system, the front steering launcher is designed to inject four individually steered beams across nearly the entire plasma cross section. The beam's launch angles can be continuously varied with the optimized scanning range of over 30° in poloidal direction and ±25° in toroidal, as well as the polarization will be adjusted during the discharge by the orientations of a pair of polarizers in the transmission line to maintain the highest absorption for different operational scenarios. The commissioning of the first 2 MW system will be commenced in the end of 2014.

  19. Financial Reporting for Tennessee Public Colleges and Universities.

    Science.gov (United States)

    Tennessee Higher Education Commission, Nashville.

    This manual provides a framework for accounting practices, budgeting and reporting procedures for Tennessee public higher education institutions. Emphasis is placed on principles and procedures of accounting and financial reporting; the balance sheet; statement of changes in fund balances; statement of current funds revenues, expenditures, and…

  20. Sub-seasonal prediction over East Asia during boreal summer using the ECCC monthly forecasting system

    Science.gov (United States)

    Liang, Ping; Lin, Hai

    2018-02-01

    A useful sub-seasonal forecast is of great societal and economical value in the highly populated East Asian region, especially during boreal summer when frequent extreme events such as heat waves and persistent heavy rainfalls occur. Despite recent interest and development in sub-seasonal prediction, it is still unclear how skillful dynamical forecasting systems are in East Asia beyond 2 weeks. In this study we evaluate the sub-seasonal prediction over East Asia during boreal summer in the operational monthly forecasting system of Environment and Climate Change Canada (ECCC).Results show that the climatological intra-seasonal oscillation (CISO) of East Asian summer monsoonis reasonably well captured. Statistically significant forecast skill of 2-meter air temperature (T2m) is achieved for all lead times up to week 4 (days 26-32) over East China and Northeast Asia, which is consistent with the skill in 500 hPa geopotential height (Z500). Significant forecast skill of precipitation, however, is limited to the week of days 5-11. Possible sources of predictability on the sub-seasonal time scale are analyzed. The weekly mean T2m anomaly over East China is found to be linked to an eastward propagating extratropical Rossby wave from the North Atlantic across Europe to East Asia. The Madden-Julian Oscillation (MJO) and El Nino-Southern Oscillation (ENSO) are also likely to influence the forecast skill of T2m at the sub-seasonal timescale over East Asia.

  1. Solar lanterns or solar home lighting systems - Community preferences in East Timor

    Energy Technology Data Exchange (ETDEWEB)

    Bond, M.; Aye, Lu; Fuller, R.J. [Renewable Energy and Energy Efficiency Group, Department of Civil and Environmental Engineering, The University of Melbourne, Victoria 3010 (Australia)

    2010-05-15

    Access to electrification in rural areas of East Timor is extremely limited with as few as 5% of rural households connected to electricity. The government of East Timor intends to increase rural access to electricity significantly in the coming decade. The introduction of small PV systems is envisaged for many households in the most remote areas. Several agencies have piloted the introduction of small solar home systems (SHS) and solar lanterns. In the Railaco sub-district of East Timor, some 1000 households have experience of using either SHS and/or solar lanterns and are in a unique position to indicate a preference regarding these forms of PV lighting technology. This paper reports on a survey of 76 households in Railaco investigating experience with PV lighting systems. Results of the survey indicate a strong preference by users for SHS rather than lanterns. The preference for SHS arose from a range of factors including: a perception of better light quality; ability to illuminate the whole house; reduced risk of damage to the PV equipment; and longer duration of nightly operation. The research indicates that where a single PV lighting system is provided, users are likely to prefer SHS to solar lanterns. (author)

  2. Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, M.J.

    2005-12-20

    This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands or rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description

  3. Northeast Tennessee Educators' Perception of STEM Education Implementation

    Science.gov (United States)

    Turner, Kristin Beard

    2013-01-01

    A quantitative nonexperimental survey study was developed to investigate Northeast Tennessee K-8 educators' perceptions of STEM education. This study was an examination of current perceptions of STEM education. Perceived need, current implementation practices, access to STEM resources, definition of STEM, and the current condition of STEM in…

  4. Remedial investigation work plan for the Upper East Fork Poplar Creek characterization area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    The Oak Ridge Y-12 Plant, located within the Oak Ridge Reservation (ORR), is owned by the US Department of Energy (DOE) and managed by Lockheed Martin Energy Systems, Inc. The entire ORR was placed on the National Priorities List (NPL) of CERCLA sites in November 1989. Following CERCLA guidelines, sites under investigation require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) of potential remedial actions. The need to complete RIs in a timely manner resulted in the establishment of the Upper East Fork Poplar Creek (UEFPC) Characterization Area (CA) and the Bear Creek CA. The CA approach considers the entire watershed and examines all appropriate media within it. The UEFPC CA, which includes the main Y-12 Plant area, is an operationally and hydrogeologically complex area that contains numerous contaminants and containment sources, as well as ongoing industrial and defense-related activities. The UEFPC CA also is the suspected point of origin for off-site groundwater and surface-water contamination. The UEFPC CA RI also will address a carbon-tetrachloride/chloroform-dominated groundwater plume that extends east of the DOE property line into Union Valley, which appears to be connected with springs in the valley. In addition, surface water in UEFPC to the Lower East Fork Poplar Creek CA boundary will be addressed. Through investigation of the entire watershed as one ''site,'' data gaps and contaminated areas will be identified and prioritized more efficiently than through separate investigations of many discrete units.

  5. Year 2000 estimated population dose for the Tennessee Valley region

    International Nuclear Information System (INIS)

    Fletcher, J.F.; Strauch, S.; Siegel, G.R.; Witherspoon, J.P.

    1976-01-01

    A comprehensive study has recently been completed of the potential regional radiological dose in the Tennessee and Cumberland river basins in the year 2000, resulting from the operation of nuclear facilities. This study, sponsored jointly by the U.S. Energy Research and Development Administration and the Tennessee Valley Authority, was performed by the Hanford Engineering Development Laboratory (HEDL), the Oak Ridge National Laboratory (ORNL), and the Atmospheric Turbulence and Diffusion Laboratory (ATDL). This study considered the operation in the year 2000 of 33,000 MWe of nuclear capacity within the study area, and of 110,000 MWe in adjacent areas, together with supporting nuclear fuel fabrication and reprocessing facilities. Air and water transport models used and methods for calculating nuclide concentrations on the ground are discussed

  6. National innovation system dynamics in East Central Europe, the Baltic Countries and Russia

    DEFF Research Database (Denmark)

    Makkonen, Teemu

    2014-01-01

    Here, the structure and dynamics of national innovation systems are explored to produce a comprehensive picture of the current, as well as the past, performance of the countries of East Central Europe, the Baltic Countries and Russia vis-à-vis their competiveness and innovative capability....... The results highlight the importance of political and economic freedom, science and education for promoting innovation. According to the principal component analyses, the best performing countries, in terms of their national innovation systems, of the East Central Europe and the Baltic Countries have...

  7. Fast reciprocating probe system on the EAST superconducting tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, W.; Chang, J. F.; Wan, B. N.; Xu, G. S.; Li, B.; Xu, C. S.; Yan, N.; Wang, L.; Liu, S. C.; Jiang, M.; Liu, P. [Institute of Plasma Physics, Chinese Academy of Sciences, P.O. Box 1126, Hefei 230031 (China); Xiao, C. J. [Institute of Plasma Physics, Chinese Academy of Sciences, P.O. Box 1126, Hefei 230031 (China); Department of Physics and Engineering Physics, Plasma Physics Laboratory, University of Saskatchewan, Saskatoon SK S7N 5E2 (Canada)

    2010-11-15

    A new fast reciprocating probe system (FRPS) has been built and installed on the outer midplane of the EAST tokamak to investigate the profiles of the boundary plasma parameters such as electron density and temperature. The system consists of a two-stage motion drive mechanism: slow motion and fast motion. The fast motion is powered by a servo motor, which drives the probe horizontally up to 50 cm to scan the edge region of the EAST tokamak. The maximum velocity achieved is 2 m/s. High velocity and flexible control of the fast motion are the remarkable features of this FRPS. A specially designed connector installed at the front end of the probe shaft makes it easy to install or replace the probe head on FRPS. During the latest experimental campaign in the spring of 2010, a probe head with seven tips, including two tips for a Mach probe, has been used. An example is given for simultaneous profile measurements of the plasma temperature, plasma density, and the plasma flow velocity.

  8. An intelligent remote control system for ECEI on EAST

    Science.gov (United States)

    Chen, Dongxu; Zhu, Yilun; Zhao, Zhenling; Qu, Chengming; Liao, Wang; Xie, Jinlin; Liu, Wandong

    2017-08-01

    An intelligent remote control system based on a power distribution unit (PDU) and Arduino has been designed for the electron cyclotron emission imaging (ECEI) system on Experimental Advanced Superconducting Tokamak (EAST). This intelligent system has three major functions: ECEI system reboot, measurement region adjustment and signal amplitude optimization. The observation region of ECEI can be modified for different physics proposals by remotely tuning the optical and electronics systems. Via the remote adjustment of the attenuation level, the ECEI intermediate frequency signal amplitude can be efficiently optimized. The remote control system provides a feasible and reliable solution for the improvement of signal quality and the efficiency of the ECEI diagnostic system, which is also valuable for other diagnostic systems.

  9. Biogeochemistry of mercury in a river-reservoir system: impact of an inactive chloralkali plant on the Holston River-Cherokee Reservoir, Virginia and Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrand, S. G.; Lindberg, S. E.; Turner, R. R.; Huckabee, J. W.; Strand, R. H.; Lund, J. R.; Andren, A. W.

    1980-08-01

    Elevated mercury concentrations in fish species from the North Fork of the Holston River were observed in the early 1970's. The source of the mercury was a chloralkali plant which had ceased operation in 1972. Mercury continues to be released to the river from two large (approx. 40-ha) waste disposal ponds at the plant site. This report presents results of a study of the emission of mercury to the environment from the abandoned waste ponds and of the distribution of mercury in water, sediment, and biota of the Holston River-Cherokee Reservoir System in Virginia and eastern Tennessee.

  10. Knowledge, attitudes, and practices regarding Rocky Mountain spotted fever among healthcare providers, Tennessee, 2009.

    Science.gov (United States)

    Mosites, Emily; Carpenter, L Rand; McElroy, Kristina; Lancaster, Mary J; Ngo, Tue H; McQuiston, Jennifer; Wiedeman, Caleb; Dunn, John R

    2013-01-01

    Tennessee has a high incidence of Rocky Mountain spotted fever (RMSF), the most severe tick-borne rickettsial illness in the United States. Some regions in Tennessee have reported increased illness severity and death. Healthcare providers in all regions of Tennessee were surveyed to assess knowledge, attitudes, and perceptions regarding RMSF. Providers were sent a questionnaire regarding knowledge of treatment, diagnosis, and public health reporting awareness. Responses were compared by region of practice within the state, specialty, and degree. A high proportion of respondents were unaware that doxycycline is the treatment of choice in children ≤ 8 years of age. Physicians practicing in emergency medicine, internal medicine, and family medicine; and nurse practitioners, physician assistants, and providers practicing for < 20 years demonstrated less knowledge regarding RMSF. The gaps in knowledge identified between specialties, designations, and years of experience can help target education regarding RMSF.

  11. Report of a Planning Conference for Solar Technology Information Transfer (Nashville, Tennessee, September 28-29, 1977).

    Science.gov (United States)

    Gleaves, Edwin S., Ed.

    A summary of the deliberations of the Planning Conference for Solar Technology Information Transfer--to discuss and outline a functioning solar energy technology network in the State of Tennessee--and a set of recommendations for future action are presented in this report. Topic areas include: (1) the Tennessee Regional Library Service; (2) the…

  12. Mathematics in energy related research at the Tennessee Valley Authority, at Union Carbide's Oak Ridge Facilities, and at University of Tennessee College of Engineering. Final report

    International Nuclear Information System (INIS)

    Barett, L.K.

    1979-05-01

    This report contains a description of the work performed under the Department of Energy Contract No. ER078-S-05-5944 to the University of Tennessee. The major objective of this contract was to survey and to classify a selection of the mathematics used in energy-related activities at the Tennessee Valley Authority (TVA), at Union Carbide's Oak Ridge Facilities (UCORF), and at the University of Tennessee College of Engineering (UTCE). Eighty-seven projects were identified at these organizations in which mathematics plays a significant modeling or problem-solving role. Uniform abstracts of these projects are included in this report, as well as abstracts of twenty-seven presentations by TVA and UCORF personnel on the topic of mathematics in energy research, at the 1978 Fall SIAM meeting. Classifications of these one hundred and fourteen abstracts are given in terms of the energy area or function involved and in terms of the mathematical disciplines used in the activity. Only a selection of the mathematical activity at the TVA, UCORF, and UTCE involved in energy research was obtained due to time and budget constraints. However, it was possible to make some important observations and recommendations based upon these sample data, and these are included in the summary of this report

  13. Lessons-Learned from D and D Activities at the Five Gaseous Diffusion Buildings (K-25, K- 27, K-29, K-31 and K-33) East Tennessee Technology Park, Oak Ridge, TN - 13574

    International Nuclear Information System (INIS)

    Kopotic, James D.; Ferri, Mark S.; Buttram, Claude

    2013-01-01

    The East Tennessee Technology Park (ETTP) is the site of five former gaseous diffusion plant (GDP) process buildings that were used to enrich uranium from 1945 to 1985. The process equipment in the original two buildings (K-25 and K-27) was used for the production of highly enriched uranium (HEU), while that in the three later buildings (K-29, K-31 and K-33) produced low enriched uranium (LEU). Equipment was contaminated primarily with uranium and to a lesser extent technetium (Tc). Decommissioning of the GDP process buildings has presented several unique challenges and produced many lessons-learned. Among these is the importance of good, up-front characterization in developing the best demolition approach. Also, chemical cleaning of process gas equipment and piping (PGE) prior to shutdown should be considered to minimize the amount of hold-up material that must be removed by demolition crews. Another lesson learned is to maintain shutdown buildings in a dry state to minimize structural degradation which can significantly complicate characterization, deactivation and demolition efforts. Perhaps the most important lesson learned is that decommissioning GDP process buildings is first and foremost a waste logistics challenge. Innovative solutions are required to effectively manage the sheer volume of waste generated from decontamination and demolition (D and D) of these enormous facilities. Finally, close coordination with Security is mandatory to effectively manage Special Nuclear Material (SNM) and classified equipment issues. (authors)

  14. Lessons-Learned from D and D Activities at the Five Gaseous Diffusion Buildings (K-25, K- 27, K-29, K-31 and K-33) East Tennessee Technology Park, Oak Ridge, TN - 13574

    Energy Technology Data Exchange (ETDEWEB)

    Kopotic, James D. [United States Department of Energy, Oak Ridge Office, P.O. Box 2001, Oak Ridge, TN 37831 (United States); Ferri, Mark S.; Buttram, Claude [URS - CH2M Oak Ridge LLC, East Tennessee Technology Park, P. O. Box 4699, Oak Ridge, TN 37831 (United States)

    2013-07-01

    The East Tennessee Technology Park (ETTP) is the site of five former gaseous diffusion plant (GDP) process buildings that were used to enrich uranium from 1945 to 1985. The process equipment in the original two buildings (K-25 and K-27) was used for the production of highly enriched uranium (HEU), while that in the three later buildings (K-29, K-31 and K-33) produced low enriched uranium (LEU). Equipment was contaminated primarily with uranium and to a lesser extent technetium (Tc). Decommissioning of the GDP process buildings has presented several unique challenges and produced many lessons-learned. Among these is the importance of good, up-front characterization in developing the best demolition approach. Also, chemical cleaning of process gas equipment and piping (PGE) prior to shutdown should be considered to minimize the amount of hold-up material that must be removed by demolition crews. Another lesson learned is to maintain shutdown buildings in a dry state to minimize structural degradation which can significantly complicate characterization, deactivation and demolition efforts. Perhaps the most important lesson learned is that decommissioning GDP process buildings is first and foremost a waste logistics challenge. Innovative solutions are required to effectively manage the sheer volume of waste generated from decontamination and demolition (D and D) of these enormous facilities. Finally, close coordination with Security is mandatory to effectively manage Special Nuclear Material (SNM) and classified equipment issues. (authors)

  15. Design demonstrations for the remaining 19 Category B tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-06-01

    This document presents design demonstrations conducted of liquid low-level waste (LLLW) storage tank systems located at the Oak Ridge National Laboratory (ORNL). ORNL has conducted research in energy related fields since 1943. The facilities used to conduct the research include nuclear reactors, chemical pilot plants, research laboratories, radioisotope production laboratories, and support facilities. These facilities have produced a variety of radioactive and/or hazardous wastes that have been transported and stored through an extensive network of piping and tankage. Demonstration of the design of these tank systems has been stipulated by the Federal Facility Agreement (FFA) between the EPA (United States Environmental Protection Agency)-Region IV; the Tennessee Department of Environment and Conservation (TDEC); and the DOE. The FFA establishes four categories of tank systems: Category A-New or Replacement Tank Systems with Secondary Containment; Category B-Existing Tank Systems with Secondary Containment; Category C-Existing Tank Systems Without Secondary Containment, and Category D-Existing Tank Systems Without Secondary Containment That are Removed from Service. This document provides a design demonstration of the secondary containment and ancillary equipment of 19 tank systems listed in the FFA as Category B. The design demonstration for each tank is presented in Section 2. The assessments assume that each tank system was constructed in accordance with the design drawings and construction specifications for that system unless specified otherwise. Each design demonstration addresses system conformance to the requirements of the FFA (Appendix F, Section C)

  16. Prospective regional studies: The Rhine Meuse study and the Tennessee Valley study

    International Nuclear Information System (INIS)

    Bayer, A.

    1980-01-01

    Within the scope of this report two regional studies are presented: - the 'Rhein-Maas-Study' within which the expected radiological impact of the population in the Rhein and Maas basin - which is situated within Central Europe - is assessed on the basis of the planned and forecasted development of nuclear energy in the coming decades. - The 'Tennessee Valley Study' within which the expected radiological impact of the population in the Tennessee-Cumberland basis - which is situated within North America - is assessed likewise on the basis of the planned and forecasted development of nuclear energy in the coming decades. (orig./RW)

  17. Identification of aggregates for Tennessee bituminous surface courses

    Science.gov (United States)

    Sauter, Heather Jean

    Tennessee road construction is a major venue for federal and state spending. Tax dollars each year go to the maintenance and construction of roads. One aspect of highway construction that affects the public is the safety of its state roads. There are many factors that affect the safety of a given road. One factor that was focused on in this research was the polish resistance capabilities of aggregates. Several pre-evaluation methods have been used in the laboratory to predict what will happen in a field situation. A new pre-evaluation method was invented that utilized AASHTO T 304 procedure upscaled to accommodate surface bituminous aggregates. This new method, called the Tennessee Terminal Textural Condition Method (T3CM), was approved by Tennessee Department of Transportation to be used as a pre-evaluation method on bituminous surface courses. It was proven to be operator insensitive, repeatable, and an accurate indication of particle shape and texture. Further research was needed to correlate pre-evaluation methods to the current field method, ASTM E 274-85 Locked Wheel Skid Trailer. In this research, twenty-five in-place bituminous projects and eight source evaluations were investigated. The information gathered would further validate the T3CM and find the pre-evaluation method that best predicted the field method. In addition, new sources of aggregates for bituminous surface courses were revealed. The results of this research have shown T3CM to be highly repeatable with an overall coefficient of variation of 0.26% for an eight sample repeatability test. It was the best correlated pre-evaluation method with the locked wheel skid trailer method giving an R2 value of 0.3946 and a Pearson coefficient of 0.710. Being able to predict field performance of aggregates prior to construction is a powerful tool capable of saving time, money, labor, and possibly lives.

  18. National Program of Inspection of Non-Federal Dams, Tennessee. Lambert Dam (Inventory Number TN 00901), Little Tennessee River Basin, near Six Mile, Blount County, Tennessee. Phase I Investigation Report,

    Science.gov (United States)

    1981-09-01

    the aam was inspected on October 17, 1963 by William P. Clark of the Tennessee Valley Authority. A written report and photos of this...region is characterized by series of alternate linear ridges and valleys extending in the southwest-northeast direction. The over- burden at the dam site...dozen homes are located along An earthei, dam impounding the six mile creek below the dam about 15 acres of water slowly in the Chota

  19. Addressing Indigenous (ICT) Approaches in South-East Asian Learning Systems

    Science.gov (United States)

    Amato, Silvia

    2013-01-01

    Purpose: The purpose of this paper is to provide a structural overview about indigenous approaches to learning in South East Asian countries, with a particular reference to education initiatives that have been operating in this region; and especially to investigate information and communication technologies (ICT) systems, in combination with…

  20. Assessing the Costs and Benefits of Resilience Investments: Tennessee Valley Authority Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Allen, Melissa R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wilbanks, Thomas J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Preston, Benjamin L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kao, Shih-Chieh [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bradbury, James [U.S. Department of Energy (DOE), Office of Energy Policy and Systems Analysis (EPSA), Washington, DC (United States)

    2017-01-01

    This report describes a general approach for assessing climate change vulnerabilities of an electricity system and evaluating the costs and benefits of certain investments that would increase system resilience. It uses Tennessee Valley Authority (TVA) as a case study, concentrating on the Cumberland River basin area on the northern side of the TVA region. The study focuses in particular on evaluating risks associated with extreme heat wave and drought conditions that could be expected to affect the region by mid-century. Extreme climate event scenarios were developed using a combination of dynamically downscaled output from the Community Earth System Model and historical heat wave and drought conditions in 1993 and 2007, respectively.

  1. Progress report and technology status development of an EG and G Berthold LB-150 alpha/beta particulate monitor for use on the East Tennessee Technology Park Toxic Substances Control Act Incinerator

    Energy Technology Data Exchange (ETDEWEB)

    Shor, J.T.; Singh, S.P.N. [Oak Ridge National Lab., TN (United States). Chemical Technology Div.; Gibson, L.V. Jr. [East Tennessee Technology Park, Oak Ridge, TN (United States). ASO Customer Services Div.

    1998-06-01

    The purpose of this project was to modify and evaluate a commercially available EG and G Berthold LB-150 alpha-beta radionuclide particulate monitor for the high-temperature and moisture-saturation conditions of the East Tennessee Technology Park (formerly K-25 Site) Toxic Substances Control Act (TSCA) Incinerator stack. The monitor was originally outfitted for operation at gas temperatures of 150 F on the defunct Los Alamos National Laboratory (LANL) controlled air incinerator, and the objective was to widen its operating envelope. A laboratory apparatus was constructed that simulated the effects of water-saturated air at the TSCA Incinerator stack-gas temperatures, 183 F. An instrumented set of heat exchangers was constructed to then condition the gas so that the radionuclide monitor could be operated without condensation. Data were collected under the conditions of the elevated temperatures and humidities and are reported herein, and design considerations of the apparatus are provided. The heat exchangers and humidification equipment performed as designed, the Mylar film held, and the instrument suffered no ill effects. However, for reasons as yet undetermined, the sensitivity of the radionuclide detection diminishes as the gas temperature is elevated, whether the gas is humidified or not. The manufacturer has had no experience with (a) the operation of the monitor under these conditions and (b) any commercial market that might exist for an instrument that operates under these conditions. The monitor was not installed into the radiologically contaminated environment of the TSCA Incinerator stack pending resolution of this technical issue.

  2. Progress report and technology status development of an EG and G Berthold LB-150 alpha/beta particulate monitor for use on the East Tennessee Technology Park Toxic Substances Control Act Incinerator

    International Nuclear Information System (INIS)

    Shor, J.T.; Singh, S.P.N.; Gibson, L.V. Jr.

    1998-06-01

    The purpose of this project was to modify and evaluate a commercially available EG and G Berthold LB-150 alpha-beta radionuclide particulate monitor for the high-temperature and moisture-saturation conditions of the East Tennessee Technology Park (formerly K-25 Site) Toxic Substances Control Act (TSCA) Incinerator stack. The monitor was originally outfitted for operation at gas temperatures of 150 F on the defunct Los Alamos National Laboratory (LANL) controlled air incinerator, and the objective was to widen its operating envelope. A laboratory apparatus was constructed that simulated the effects of water-saturated air at the TSCA Incinerator stack-gas temperatures, 183 F. An instrumented set of heat exchangers was constructed to then condition the gas so that the radionuclide monitor could be operated without condensation. Data were collected under the conditions of the elevated temperatures and humidities and are reported herein, and design considerations of the apparatus are provided. The heat exchangers and humidification equipment performed as designed, the Mylar film held, and the instrument suffered no ill effects. However, for reasons as yet undetermined, the sensitivity of the radionuclide detection diminishes as the gas temperature is elevated, whether the gas is humidified or not. The manufacturer has had no experience with (a) the operation of the monitor under these conditions and (b) any commercial market that might exist for an instrument that operates under these conditions. The monitor was not installed into the radiologically contaminated environment of the TSCA Incinerator stack pending resolution of this technical issue

  3. Fiscal year 1993 well plugging and abandonment program, Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This report is a synopsis of the progress of the well plugging and abandonment program at the Y-12 Plant, Oak Ridge, Tennessee, from December 1992 through August 20, 1993. A total of 70 wells and borings were plugged and abandoned during the period of time covered in this report. All wells and borings were plugged and abandoned in accordance with the Monitoring Well Plugging and Abandonment Plan for the US Department of Energy, Y-12 Plant, Oak Ridge, Tennessee (HSW, Inc. 1991).

  4. The transient electric field measurement system for EAST device

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Y., E-mail: wayong@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Ji, Z.S. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Zhu, C.M. [The Experiment & Verification Center of State Grid Electric Power Research Institute (The Automation Equipment EMC Lab. of State Grid Co.), Nanjing, Jiangsu (China); Zhang, Z.C.; Ma, T.F.; Xu, Z.H. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China)

    2016-11-15

    The electromagnetic environment around the Experimental Advanced Superconducting Tokamak (EAST) device is very complex during plasma discharge experiment. In order to fully monitor the changes of electric field around the EAST device during plasma discharge, a transient electric field measurement system based on PCI eXtensions for Instrumentation (PXI) platform has been designed. A digitizer is used for high-speed data acquisition of raw signals from electric field sensors, and a Field Programmable Gate Array (FPGA) module is used for realizing an on-the-fly fast Fourier transform (FFT) and inverse fast Fourier transform (IFFT) algorithm including a beforehand identified antenna factor (AF) to achieve finally a calibrated and filtered electric field measurement, then these signals can be displayed and easily analyzed. The raw signals from electric field sensors are transferred through optical fiber by optical isolation to reduce electromagnetic interference (EMI). The high speed data streaming technology is used for data storage. A prototype of this system has been realized to measure the transient electric field strength, with the real-time processing and continuous acquisition ability of one channel of 14-bit resolution and up to 50 MHz sampling rate, and 6 KHz FFT frequency resolution.

  5. University of Tennessee deploys force10 switch for CERN work

    CERN Multimedia

    2007-01-01

    "Force20 networks, the pioneer in building and securing reliable networks, today announced that the University of Tennessee physics department has deployed the C300 resilient switch to analyze data form CERN's Large Hadron Collider." (1/2 page)

  6. Safety evaluation report on Tennessee Valley Authority: Browns Ferry nuclear performance plan

    International Nuclear Information System (INIS)

    1989-10-01

    This safety evaluation report (SER) on the information submitted by the Tennessee Valley Authority (TVA) in its Nuclear Performance Plan, through Revision 2, for the Browns Ferry Nuclear Plant and in supporting documents has been prepared by the US Nuclear Regulatory commission staff. The Browns Ferry Nuclear Plant consists of three boiling-water reactors at a site in Limestone County, Alabama. The plan addresses the plant-specific concerns requiring resolution before the startup of Unit 2. The staff will inspect implementation of those TVA programs that address these concerns. Where systems are common to Units 1 and 2 or to Units 2 and 3, the staff safety evaluations of those systems are included herein. 85 refs

  7. Department of Energy - Oak Ridge Operations and URS - CH2M Oak Ridge LLC. Partnering Framework for the Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 12348

    Energy Technology Data Exchange (ETDEWEB)

    Schubert, Allen L. [URS - CH2M Oak Ridge LLC (UCOR), East Tennessee Technology Park D and D and Environmental Remediation Project, Oak Ridge, Tennessee 37830 (United States)

    2012-07-01

    The cleanup and re-industrialization of the East Tennessee Technology Park (ETTP) hinges on a collaborative working relationship between the cleanup contractor and the U.S. Department of Energy's (DOE)-Oak Ridge Office (ORO). A Partnering Framework document was signed on June 30, 2011, with an ultimate goal of completing the contract scope of work ahead of schedule and under budget. This partnering process was the first time that DOE and its contractor, jointly developed and signed such an agreement before the contractor assumed management responsibilities of the Site. A strong desire of both parties to utilize a partnering approach in the performance of their respective responsibilities is evident. The Partnering Framework was modeled after a partnering process employed by the California Department of Transportation, Division of Construction. This partnering process has been used successfully by the California Department of Transportation and its major contractors for many years with great success. The partnering process used at ETTP was a phased approach. First, a Partnering Framework document was developed and signed June 30, 2011, by the Partnering Sponsors, the two leaders of the ETTP cleanup and re-industrialization project, the DOE-ORO Assistant Manager for Environmental Management and the contractor's President and Program Manager. In this way the partnering process could begin when the contactor assumed ETTP Site management responsibilities on August 1, 2011. The Partnering Framework then set the stage for the second phase of the partnering process which would be development of the Partnering Agreement and the kick-off of the first of a number of facilitated Partnering Workshops. Key elements of the Partnering Framework document include: (1) a statement of commitment which affirms the desire of both parties to work collaboratively toward the cleanup and re-industrialization of the ETTP Site; (2) a vision which describes both parties ultimate goal

  8. Department of Energy - Oak Ridge Operations and URS - CH2M Oak Ridge LLC. Partnering Framework for the Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 12348

    International Nuclear Information System (INIS)

    Schubert, Allen L.

    2012-01-01

    The cleanup and re-industrialization of the East Tennessee Technology Park (ETTP) hinges on a collaborative working relationship between the cleanup contractor and the U.S. Department of Energy's (DOE)-Oak Ridge Office (ORO). A Partnering Framework document was signed on June 30, 2011, with an ultimate goal of completing the contract scope of work ahead of schedule and under budget. This partnering process was the first time that DOE and its contractor, jointly developed and signed such an agreement before the contractor assumed management responsibilities of the Site. A strong desire of both parties to utilize a partnering approach in the performance of their respective responsibilities is evident. The Partnering Framework was modeled after a partnering process employed by the California Department of Transportation, Division of Construction. This partnering process has been used successfully by the California Department of Transportation and its major contractors for many years with great success. The partnering process used at ETTP was a phased approach. First, a Partnering Framework document was developed and signed June 30, 2011, by the Partnering Sponsors, the two leaders of the ETTP cleanup and re-industrialization project, the DOE-ORO Assistant Manager for Environmental Management and the contractor's President and Program Manager. In this way the partnering process could begin when the contactor assumed ETTP Site management responsibilities on August 1, 2011. The Partnering Framework then set the stage for the second phase of the partnering process which would be development of the Partnering Agreement and the kick-off of the first of a number of facilitated Partnering Workshops. Key elements of the Partnering Framework document include: (1) a statement of commitment which affirms the desire of both parties to work collaboratively toward the cleanup and re-industrialization of the ETTP Site; (2) a vision which describes both parties ultimate goal of safe

  9. Prehistoric floods on the Tennessee River—Assessing the use of stratigraphic records of past floods for improved flood-frequency analysis

    Science.gov (United States)

    Harden, Tessa M.; O'Connor, Jim E.

    2017-06-14

    Stratigraphic analysis, coupled with geochronologic techniques, indicates that a rich history of large Tennessee River floods is preserved in the Tennessee River Gorge area. Deposits of flood sediment from the 1867 peak discharge of record (460,000 cubic feet per second at Chattanooga, Tennessee) are preserved at many locations throughout the study area at sites with flood-sediment accumulation. Small exposures at two boulder overhangs reveal evidence of three to four other floods similar in size, or larger, than the 1867 flood in the last 3,000 years—one possibly as much or more than 50 percent larger. Records of floods also are preserved in stratigraphic sections at the mouth of the gorge at Williams Island and near Eaves Ferry, about 70 river miles upstream of the gorge. These stratigraphic records may extend as far back as about 9,000 years ago, giving a long history of Tennessee River floods. Although more evidence is needed to confirm these findings, a more in-depth comprehensive paleoflood study is feasible for the Tennessee River.

  10. Distribution of the long-horned beetle, Dectes texanus, in soybeans of Missouri, Western Tennessee, Mississippi, and Arkansas.

    Science.gov (United States)

    Tindall, Kelly V; Stewart, Scott; Musser, Fred; Lorenz, Gus; Bailey, Wayne; House, Jeff; Henry, Robert; Hastings, Don; Wallace, Milus; Fothergill, Kent

    2010-01-01

    The long-horned beetle, Dectes texanus LeConte (Coleoptera: Cerambycidae), is a stem-boring pest of soybeans, Glycine max (L.) Merrill (Fabales: Fabaceae). Soybean stems and stubble were collected from 131 counties in Arkansas, Mississippi, Missouri, and Tennessee and dissected to determine D. texanus infestation rates. All states sampled had D. texanus present in soybeans. Data from Tennessee and Arkansas showed sample infestations of D. texanus averaging nearly 40%. Samples from Missouri revealed higher infestation in the twelve southeastern counties compared to the rest of the state. Data from Mississippi suggested that D. texanus is not as problematic there as in Arkansas, Missouri, and Tennessee. Infestation rates from individual fields varied greatly (0-100%) within states. In Tennessee, second crop soybeans (i.e. soybeans planted following winter wheat) had lower infestations than full season soybeans. A map of pest distribution is presented that documents the extent of the problem, provides a baseline from which changes can be measured, contributes data for emergency registration of pesticides for specific geographic regions, and provides useful information for extension personnel, crop scouts, and growers.

  11. Confirmatory Sampling and Analysis Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    On December 21, 1989, the EPA placed the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) on the National Priorities List (NPL). On January 1, 1992, a Federal Facilities Agreement (FFA) between the DOE Field Office in Oak Ridge (DOE-OR), EPA Region IV, and the Tennessee Department of Environment and Conservation (TDEC) went into effect. This FFA establishes the procedural framework and schedule by which DOE-OR will develop, coordinate, implement and monitor environmental restoration activities on the ORR in accordance with applicable federal and state environmental regulations. The DOE-OR Environmental Restoration Program for the ORR addresses the remediation of areas both within and outside the ORR boundaries. This sampling and analysis plan focuses on confirming the cleanup of the stretch of EFPC flowing from Lake Reality at the Y-12 Plant through the City of Oak Ridge, to Poplar Creek on the ORR and its associated floodplain. Both EFPC and its floodplain have been contaminated by releases from the Y-12 Plant since the mid-1950s. Because the EFPC site-designated as an ORR operable unit (OU) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) is included on the NPL, its remediation must follow the specific procedures mandated by CERCLA, as amended by the Superfund Amendments and Reauthorization Act in 1986

  12. Confirmatory Sampling and Analysis Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    On December 21, 1989, the EPA placed the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) on the National Priorities List (NPL). On January 1, 1992, a Federal Facilities Agreement (FFA) between the DOE Field Office in Oak Ridge (DOE-OR), EPA Region IV, and the Tennessee Department of Environment and Conservation (TDEC) went into effect. This FFA establishes the procedural framework and schedule by which DOE-OR will develop, coordinate, implement and monitor environmental restoration activities on the ORR in accordance with applicable federal and state environmental regulations. The DOE-OR Environmental Restoration Program for the ORR addresses the remediation of areas both within and outside the ORR boundaries. This sampling and analysis plan focuses on confirming the cleanup of the stretch of EFPC flowing from Lake Reality at the Y-12 Plant through the City of Oak Ridge, to Poplar Creek on the ORR and its associated floodplain. Both EFPC and its floodplain have been contaminated by releases from the Y-12 Plant since the mid-1950s. Because the EFPC site-designated as an ORR operable unit (OU) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) is included on the NPL, its remediation must follow the specific procedures mandated by CERCLA, as amended by the Superfund Amendments and Reauthorization Act in 1986.

  13. Observations of the southern East Madagascar Current and undercurrent and countercurrent system

    Science.gov (United States)

    Nauw, J. J.; van Aken, H. M.; Webb, A.; Lutjeharms, J. R. E.; de Ruijter, W. P. M.

    2008-08-01

    In April 2001 four hydrographic sections perpendicular to the southern East Madagascar Current were surveyed as part of the Agulhas Current Sources Experiment. Observations with a vessel mounted and a lowered ADCP produced information on the current field while temperature, salinity, oxygen and nutrient data obtained with a CTD-Rosette system, gave information on the water mass structure of the currents southeast of Madagascar. The peak velocity in the pole-ward East Madagascar Current through these four sections had a typical magnitude of ˜110 cm/s, while the width of this current was of the order of 120 km. The mean pole-ward volume transport rate of this current during the survey above the 5°C isotherm was estimated to be 37 ± 10 Sv. On all four sections an undercurrent was observed at intermediate depths below the East Madagascar Current. Its equator-ward transport rate amounted to 2.8 ± 1.4 Sv. Offshore of the East Madagascar Current the shallow South Indian Ocean Countercurrent was observed. This eastward frontal jet coincided with the barotropic and thermohaline front that separates the saline Subtropical Surface Water from the fresher Tropical Surface Water in the East Madagascar Current. The near-surface geostrophic flow of the East Madagascar Current, derived from satellite altimetry data from 1992 to 2005, suggests a strong variability of this transport due to eddy variability and interannual changes. The long-term pole-ward mean transport of the East Madagascar Current, roughly estimated from those altimetry data amounts to 32 Sv. The upper-ocean water mass of the East Madagascar Current was very saline in 2001, compared to WOCE surveys from 1995. Comparison of our undercurrent data with those of the WOCE surveys in 1995 confirms that the undercurrent is a recurrent feature. Its water mass properties are relatively saline, due to the presence of water originating from the Red Sea outflow at intermediate levels. The saline water was advected from the

  14. Fiscal year 1996 well plugging and abandonment program Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    This report is a synopsis of the progress of the well plugging and abandonment program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, from August 1995 through August 1996. A total of 27 wells, piezometers, and borings were plugged and abandoned during the period of time covered in this report. All wells and borings were plugged and abandoned in accordance with the Monitoring Well Plugging and Abandonment Plan for the U.S. Department of Energy, Y-12 Plant, Oak Ridge, Tennessee (HSW, Inc. 1991).

  15. Application of a microprocessor system to stream monitoring

    International Nuclear Information System (INIS)

    Oakes, T.W.; Shank, K.E.

    1978-01-01

    Low-level liquid wastes originating from the Oak Ridge National Laboratory (ORNL) are discharged, after treatment, into White Oak Creek, which is a small tributary of the Clinch River located in East Tennessee. Samples of White Oak Creek discharges are collected at White Oak Dam by a continuous digital proportional water sampler and analyzed weekly for radioactivity. The sampler contains a control system with a microprocessor that has been programmed to solve nonlinear weir equations. This system was designed and installed at ORNL by the Instrumentation and Controls Division and was tested by the Environmental Surveillance and Evaluation Section of the Industrial Safety and Applied Health Physics Division. The control system was designed to measure water flow rates from 0 to 334 ft 3 /sec to within 0.1%. Results of our test program and possible applications to other liquid sampling needs are discussed

  16. Stratabound pathways of preferred groundwater flow: An example from the Copper Ridge Dolomite in East Tennessee

    International Nuclear Information System (INIS)

    Lee, R.; Ketelle, D.

    1987-01-01

    The Copper Ridge Dolomite of the Upper Cambrian Knox Group underlies a site at Oak Ridge, Tennessee under consideration by the Department of Energy (DOE) for a below ground waste disposal facility. The Copper Ridge was studied for DOE to understand the influence of lithology on deep groundwater flow. Three facies types are distinguished which comprise laterally continuous, 1 to 4 m thick rock units interpreted to represent upward-shallowing depositional cycles having an apparently significant effect on groundwater flow at depth. Rock core observations indicate one of the recurring facies types is characterized by thin to medium-bedded, fine-grained dolostone with planar cryptalgal laminae and thin shaley partings. Distinctive fracturing in this facies type, that may have resulted from regional structural deformation, it considered to be responsible for weathering at depth and the development of stratabound pathways of preferred groundwater flow. In addition, geophysical data suggest that one occurrence of this weathered facies type coincides with an apparent geochemical interface at depth. Geophysical data also indicate the presence of several fluid invasion horizons, traceable outside the study area, which coincide with the unweathered occurrence of this fine-grained facies type. The subcropping of recurrent zones of preferred groundwater flow at the weathered/unweathered interface may define linear traces of enhanced aquifer recharge paralleling geologic strike. Vertical projection of these zones from the weathered/unweathered rock interface to the ground surface may describe areas of enhanced infiltration. Tests to determine the role of stratigraphic controls on groundwater flow are key components of future investigations on West Chestnut Ridge. 14 refs., 13 figs

  17. 78 FR 53675 - Eighth Coast Guard District Annual Safety Zones; Boomsday Festival; Tennessee River 646.0-649.0...

    Science.gov (United States)

    2013-08-30

    ...-AA00 Eighth Coast Guard District Annual Safety Zones; Boomsday Festival; Tennessee River 646.0-649.0... Guard will enforce a Safety Zone for the Boomsday Festival Fireworks on the Tennessee River 646.0-649.0... Festival Fireworks. During the enforcement period, entry into, transiting or anchoring in the Safety Zone...

  18. Environmental impacts of the coal ash spill in Kingston, Tennessee: an 18-month survey.

    Science.gov (United States)

    Ruhl, Laura; Vengosh, Avner; Dwyer, Gary S; Hsu-Kim, Heileen; Deonarine, Amrika

    2010-12-15

    An 18 month investigation of the environmental impacts of the Tennessee Valley Authority (TVA) coal ash spill in Kingston, Tennessee combined with leaching experiments on the spilled TVA coal ash have revealed that leachable coal ash contaminants (LCACs), particularly arsenic, selenium, boron, strontium, and barium, have different effects on the quality of impacted environments. While LCACs levels in the downstream river water are relatively low and below the EPA drinking water and ecological thresholds, elevated levels were found in surface water with restricted water exchange and in pore water extracted from the river sediments downstream from the spill. The high concentration of arsenic (up to 2000 μg/L) is associated with some degree of anoxic conditions and predominance of the reduced arsenic species (arsenite) in the pore waters. Laboratory leaching simulations show that the pH and ash/water ratio control the LCACs' abundance and geochemical composition of the impacted water. These results have important implications for the prediction of the fate and migration of LCACs in the environment, particularly for the storage of coal combustion residues (CCRs) in holding ponds and landfills, and any potential CCRs effluents leakage into lakes, rivers, and other aquatic systems.

  19. Data acquisition and control system for the ECE imaging diagnostic on the EAST tokamak

    Science.gov (United States)

    Luo, C.; Lan, T.; Zhu, Y.; Xie, J.; Gao, B.; Liu, W.; Yu, C.; Milne, P. G.; Domier, C. W.; Luhmann, N. C.

    2017-06-01

    A 384-channel electron cyclotron emission imaging (ECEI) system is installed on the experimental advanced superconducting tokamak (EAST) and 7-gigabyte data is produced for each regular discharge of a 10-second pulse. The data acquisition and control (DAC) system for the EAST ECEI diagnostics covers the large data production and embeds the ability to report the data quality instantly after the discharge. The symmetric routing design of the timing signal distributions among the 384 channels provides a low-cost solution to the synchronization of a large number of channels. The application of the load-balance bond service largely reduces the configuration difficulty and the cost in the high-speed data transferring tasks. Benefiting from the various kinds of hardware units with dedicated functionalities, an automated and user interactive DAC work flow is achieved, including the pre-selections of the automation scheme and the observation region, 384-channel data acquisition and local caching, post-discharge imaging data quality evaluation, remote system status monitoring, and inter-discharge imaging system event handling. The system configuration in a specific physics experiment is further optimized through the associated operating software which is enhanced by the input of the tokamak operation status and the region of interest (ROI) from other diagnostics. The DAC system is based on a modularized design and scalable to the long-pulse discharges in the EAST tokamak.

  20. Data acquisition and control system for the ECE imaging diagnostic on the EAST tokamak

    International Nuclear Information System (INIS)

    Luo, C.; Lan, T.; Xie, J.; Gao, B.; Liu, W.; Yu, C.; Zhu, Y.; Domier, C.W.; Luhmann, N.C.; Milne, P.G.

    2017-01-01

    A 384-channel electron cyclotron emission imaging (ECEI) system is installed on the experimental advanced superconducting tokamak (EAST) and 7-gigabyte data is produced for each regular discharge of a 10-second pulse. The data acquisition and control (DAC) system for the EAST ECEI diagnostics covers the large data production and embeds the ability to report the data quality instantly after the discharge. The symmetric routing design of the timing signal distributions among the 384 channels provides a low-cost solution to the synchronization of a large number of channels. The application of the load-balance bond service largely reduces the configuration difficulty and the cost in the high-speed data transferring tasks. Benefiting from the various kinds of hardware units with dedicated functionalities, an automated and user interactive DAC work flow is achieved, including the pre-selections of the automation scheme and the observation region, 384-channel data acquisition and local caching, post-discharge imaging data quality evaluation, remote system status monitoring, and inter-discharge imaging system event handling. The system configuration in a specific physics experiment is further optimized through the associated operating software which is enhanced by the input of the tokamak operation status and the region of interest (ROI) from other diagnostics. The DAC system is based on a modularized design and scalable to the long-pulse discharges in the EAST tokamak.

  1. Conceptual design of EAST flexible in-vessel inspection system

    International Nuclear Information System (INIS)

    Peng, X.B.; Song, Y.T.; Li, C.C.; Lei, M.Z.; Li, G.

    2010-01-01

    Remote handling technology, especially the flexible in-vessel inspection system (FIVIS) without breaking the working condition of the vacuum vessel, has been identified as one major challenge on the maintenance for the future tokamak fusion reactor. The FIVIS introduced here is specially developed for EAST superconducting tokamak that has actively cooled plasma facing components (PFCs). It aims flexible close-up inspection of EAST PFCs to help the understanding of operation issues that could occur in the vacuum vessel. This paper resumes the preliminary work of the FIVIS project, including the requirement analysis and the development of the conceptual design. The FIVIS consists out of a long reach multi-articulated manipulator and a process tool. The manipulator has a modular design for its subsystems and can reach all areas of the first wall in the distance of 15 mm and in the range of ±90 o along toroidal direction. It will be folded and hidden in the designated horizontal port during plasma discharge period.

  2. Implementation plan for liquid low-level radioactive waste systems under the FFA for Fiscal years 1996 and 1997 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-10-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires a Federal Facility Agreement (FFA) for federal facilities placed on the National Priorities List. The Oak Ridge Reservation was placed on that list on December 21, 1989, and the agreement was signed in November 1991 by the Department of Energy Oak Ridge Operations Office (DOE-ORO), the U.S. Environmental Protection Agency (EPA)-Region IV, and the Tennessee Department of Environment and Conservation (TDEC). The effective date of the FFA was January 1, 1992. Section IX and Appendix F of the agreement impose design and operating requirements on the Oak Ridge National Laboratory (ORNL) liquid low-level radioactive waste (LLLW) tank systems and identify several plans, schedules, and assessments that must be submitted to EPA/TDEC for review of approval. The issue of ES/ER-17 ampersand D1 Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee in March 1992 transmitted to EPA/TDEC those plans and schedules that were required within 60 to 90 days of the FFA effective date. This document updates the plans, schedules, and strategy for achieving compliance with the FFA as presented in ES/ER-17 ampersand D I and summarizes the progress that has been made to date. This document supersedes all updates of ES/ER- 17 ampersand D 1. Chapter 1 describes the history and operation of the ORNL LLLW System and the objectives of the FFA. Chapters 2 through 5 contain the updated plans and schedules for meeting FFA requirements. This document will continue to be periodically reassessed and refined to reflect newly developed information and progress

  3. Implementation plan for liquid low-level radioactive waste systems under the FFA for Fiscal years 1996 and 1997 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires a Federal Facility Agreement (FFA) for federal facilities placed on the National Priorities List. The Oak Ridge Reservation was placed on that list on December 21, 1989, and the agreement was signed in November 1991 by the Department of Energy Oak Ridge Operations Office (DOE-ORO), the U.S. Environmental Protection Agency (EPA)-Region IV, and the Tennessee Department of Environment and Conservation (TDEC). The effective date of the FFA was January 1, 1992. Section IX and Appendix F of the agreement impose design and operating requirements on the Oak Ridge National Laboratory (ORNL) liquid low-level radioactive waste (LLLW) tank systems and identify several plans, schedules, and assessments that must be submitted to EPA/TDEC for review of approval. The issue of ES/ER-17&D1 Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee in March 1992 transmitted to EPA/TDEC those plans and schedules that were required within 60 to 90 days of the FFA effective date. This document updates the plans, schedules, and strategy for achieving compliance with the FFA as presented in ES/ER-17&D I and summarizes the progress that has been made to date. This document supersedes all updates of ES/ER- 17&D 1. Chapter 1 describes the history and operation of the ORNL LLLW System and the objectives of the FFA. Chapters 2 through 5 contain the updated plans and schedules for meeting FFA requirements. This document will continue to be periodically reassessed and refined to reflect newly developed information and progress.

  4. A real-time vision-based hand gesture interaction system for virtual EAST

    International Nuclear Information System (INIS)

    Wang, K.R.; Xiao, B.J.; Xia, J.Y.; Li, Dan; Luo, W.L.

    2016-01-01

    Highlights: • Hand gesture interaction is first introduced to EAST model interaction. • We can interact with EAST model by a bared hand and a web camera. • We can interact with EAST model with a distance to screen. • Interaction is free, direct and effective. - Abstract: The virtual Experimental Advanced Superconducting Tokamak device (VEAST) is a very complicated 3D model, to interact with which, the traditional interaction devices are limited and inefficient. However, with the development of human-computer interaction (HCI), the hand gesture interaction has become a much popular choice in recent years. In this paper, we propose a real-time vision-based hand gesture interaction system for VEAST. By using one web camera, we can use our bare hand to interact with VEAST at a certain distance, which proves to be more efficient and direct than mouse. The system is composed of four modules: initialization, hand gesture recognition, interaction control and system settings. The hand gesture recognition method is based on codebook (CB) background modeling and open finger counting. Firstly, we build a background model with CB algorithm. Then, we segment the hand region by detecting skin color regions with “elliptical boundary model” in CbCr flat of YCbCr color space. Open finger which is used as a key feature of gesture can be tracked by an improved curvature-based method. Based on the method, we define nine gestures for interaction control of VEAST. Finally, we design a test to demonstrate effectiveness of our system.

  5. A real-time vision-based hand gesture interaction system for virtual EAST

    Energy Technology Data Exchange (ETDEWEB)

    Wang, K.R., E-mail: wangkr@mail.ustc.edu.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); University of Science and Technology of China, Hefei, Anhui (China); Xiao, B.J.; Xia, J.Y. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); University of Science and Technology of China, Hefei, Anhui (China); Li, Dan [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Luo, W.L. [709th Research Institute, Shipbuilding Industry Corporation (China)

    2016-11-15

    Highlights: • Hand gesture interaction is first introduced to EAST model interaction. • We can interact with EAST model by a bared hand and a web camera. • We can interact with EAST model with a distance to screen. • Interaction is free, direct and effective. - Abstract: The virtual Experimental Advanced Superconducting Tokamak device (VEAST) is a very complicated 3D model, to interact with which, the traditional interaction devices are limited and inefficient. However, with the development of human-computer interaction (HCI), the hand gesture interaction has become a much popular choice in recent years. In this paper, we propose a real-time vision-based hand gesture interaction system for VEAST. By using one web camera, we can use our bare hand to interact with VEAST at a certain distance, which proves to be more efficient and direct than mouse. The system is composed of four modules: initialization, hand gesture recognition, interaction control and system settings. The hand gesture recognition method is based on codebook (CB) background modeling and open finger counting. Firstly, we build a background model with CB algorithm. Then, we segment the hand region by detecting skin color regions with “elliptical boundary model” in CbCr flat of YCbCr color space. Open finger which is used as a key feature of gesture can be tracked by an improved curvature-based method. Based on the method, we define nine gestures for interaction control of VEAST. Finally, we design a test to demonstrate effectiveness of our system.

  6. Improved spatial calibration for the CXRS system on EAST

    Energy Technology Data Exchange (ETDEWEB)

    Yin, X. H.; Feng, S. Y. [School of Nuclear Science and Technology, University of Science and Technology of China, Hefei 230026 (China); Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); Li, Y. Y., E-mail: liyy@ipp.ac.cn; Fu, J.; Gu, Y. Q.; Cheng, Y.; Wan, B. N. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); Jiang, D. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); School of Physics and Materials Science, Anhui University, Hefei 230601 (China); Lyu, B. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); Hefei Science Center, Chinese Academy of Sciences, Hefei 230031 (China); Shi, Y. J. [School of Nuclear Science and Technology, University of Science and Technology of China, Hefei 230026 (China); Department of Nuclear Engineering, Seoul National University, Seoul 151-742 (Korea, Republic of); Ye, M. Y. [School of Nuclear Science and Technology, University of Science and Technology of China, Hefei 230026 (China)

    2016-11-15

    A Charge eXchange Recombination Spectroscopy (CXRS) diagnostic system has been developed to measure profiles of ion temperature and rotation since 2014 on EAST. Several techniques have been developed to improve the spatial calibration of the CXRS diagnostic. The sightline location was obtained by measuring the coordinates of three points on each sightline using an articulated flexible coordinate measuring arm when the vessel was accessible. After vacuum pumping, the effect of pressure change in the vacuum vessel was evaluated by observing the movement of the light spot from back-illuminated sightlines on the first wall using the newly developed articulated inspection arm. In addition, the rotation of the periscope after vacuum pumping was derived by using the Doppler shift of neutral beam emission spectra without magnetic field. Combining these techniques, improved spatial calibration was implemented to provide a complete and accurate description of the EAST CXRS system. Due to the effects of the change of air pressure, a ∼0.4° periscope rotation, yielding a ∼20 mm movement of the major radius of observation positions to the lower field side, was derived. Results of Zeeman splitting of neutral beam emission spectra with magnetic field also showed good agreement with the calibration results.

  7. 78 FR 35989 - Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2

    Science.gov (United States)

    2013-06-14

    ..., Maryland 20852. FOR FURTHER INFORMATION CONTACT: Elaine N. Keegan, Office of Nuclear Reactor Regulation, U....Keegan@nrc.gov . SUPPLEMENTARY INFORMATION: The Tennessee Valley Authority (TVA or the applicant...

  8. Predicted effects on ground water of construction of Divide Cut section, Tennessee-Tombigbee Waterway, northeastern Mississippi, using a digital model

    Science.gov (United States)

    McBride, Mark S.

    1981-01-01

    The Tennessee-Tombigbee Waterway, connecting the Tennessee River in northeastern Mississippi with the Gulf of Mexico, is currently (1980) under construction. The Divide Section, the northernmost 39 miles of the Waterway, will consist, from north to south, of (1) a dredged channel, (2) the Divide Cut, and (3) an artifical lake impounded by the Bay Springs Dam. In all three , water will be at Tennessee River level. A three-dimensional digital model covering 3,273 square miles was constructed to simulate ground-water flow in the Gordo and Eutaw Formations and the Coffee Sand in the vicinity of the Divide Section. The model was calibrated to preconstruction water levels, then used to simulate the effects of stresses imposed by the construction of the Divide Section. The model indicates that the system stabilizes after major changes in conditions within a few months. The Divide Cut acts as a drain, lowering water levels as much as 55 feet. Drawdowns of 5 feet occur as much as 8 miles from the Cut. The 80-foot-high Bay Springs Dam raises ground-water levels by 5 feet as far as 6 miles from its impoundment. Drawdown is not likely to affect public water supplies significantly, but probably will adversely affect a relatively small number of private wells. (USGS)

  9. Ecology of Virginia big-eared bats in North Carolina and Tennessee.

    Science.gov (United States)

    2016-08-24

    The researchers conducted a study of the springtime ecology of an isolated North Carolina-Tennessee population of the Virginia big-eared bat (Corynorhinus townsendii virginianus), a federally endangered species. With limited data on the whereabouts o...

  10. Routine environmental audit of the Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-09-01

    This report documents the results of the routine environmental audit of the Oak Ridge Y-12 Plant (Y-12 Plant), Anderson County, Tennessee. During this audit, the activities conducted by the audit team included reviews of internal documents and reports from previous audits and assessments; interviews with U.S. Department of Energy (DOE), State of Tennessee regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted August 22-September 2, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). DOE 5482.1 B, open-quotes Environment, Safety, and Health Appraisal Program,close quotes establishes the mission of EH-24 to provide comprehensive, independent oversight of DOE environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is enhancement of environmental protection and minimization of risk to public health and the environment. EH-24 accomplishes its mission by conducting systematic and periodic evaluations of DOE's environmental programs within line organizations, and by using supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements

  11. The East Garrington Trench and Gate system: it works

    International Nuclear Information System (INIS)

    Bowles, M.; Rimbey, S.; Bentley, L.; Thomas, D.; Hoyne, B.

    1997-01-01

    A 'trench and gate' system (a modification of the 'funnel and gate' system) has been installed at the Amoco-operated East Garrington gas plant in Alberta to provide long-term remediation for treating contaminated groundwater plumes hosted by low hydraulic conductivity sediments. Modification to the funnel and gate design includes an up gradient high hydraulic conductivity trench and a down gradient infiltration gallery which was found to be effective in biodegrading BTEX (benzene, toluene, ethylbenzene and xylene) compounds. A comprehensive monitoring program was set up to characterize the groundwater flow system. Several indigenous hydrocarbon degrading organisms have been identified. It was shown that locally, under aerobic conditions, phosphorus was the limiting nutrient. 13 refs., 3 tabs., 10 figs

  12. Study of electromagnetic interference on quench detecting system of HTS current leads for EAST

    International Nuclear Information System (INIS)

    Hu, Yanlan; Li, Jiangang; Ji, Zhenshan; Zhu, C.M.; Zhen, L.G.; Xiao, Y.Z.

    2013-01-01

    Highlights: • EAST HTS superconducting magnet system shall be operating in a very noisy environment. • Voltage taps will have a lot of inductive voltage induced on them which makes quench detection very difficult. • The noise comes from the coupling between rapid pulsed poloidal coils, and radiation coupling interference associated with EAST heating systems;. • A series of related electromagnetic compatibility simulation tests have been carried out. • Electromagnetic noises are well restrained by choosing proper anti-interference means. -- Abstract: High temperature superconducting (HTS) material B-2223/Ag-Au has been used for EAST poloidal field (PF) coil current leads for reducing construction and operation cost of cryogenic system. The quench propagation velocity of HTS superconducting material is several orders of magnitude lower than that of normal low temperature current leads. It is difficult to detect weak signal of quench which is easily influenced by strong electromagnetic interference (EMI). In this paper, the sources of EMI from quench detecting system of high temperature current leads have been introduced. And we have chosen reasonable methods for good transformation and protection on the basis of electromagnetic compatibility simulation diagnosis experiments. Recent experimental results showed that the restraint of EMI has been achieved and has met the requirements of experiment

  13. Tennessee Valley Region: a year 2000 profile

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-06-01

    A study was undertaken to determine the potential radiological implications of nuclear facilities in the combined watersheds of the Tennessee and Cumberland rivers, an area covering portions of 7 states of varied topography. The regional population in 1970 was about 4.6 million and is expected to increase to about 7 million by the year 2000. A 1973 projection estimated the installed electric generating capacity of the region to increase from a 1970 value of 45,000 megawatts to a total of 222,000 megawatts by the year 2000. In that year, about 144,000 megawatts were projected to be nuclear plants. The profile of the Tennessee Valley Region in the year 2000, as drawn from this report, contains the essential data for calculation of the radiological dose from operation of nuclear facilities in that year. Those calculations are reported in the companion document, DOE/ET-0064/2. Specifically, Volume I establishes the parameters describing where the people live, what they eat, the activities in which they engage, and the environmental surroundings that enable an evaluation of the potential radiation dose to the population. Airborne radionuclides from nuclear facilities in this zone may enter the study area and be deposited on the ground, on growing food, and on water surfaces. Consideration was not given to waterborne radionuclides external to the study region. 17 references. (MCW)

  14. Tennessee Valley Region: a year 2000 profile

    International Nuclear Information System (INIS)

    1978-06-01

    A study was undertaken to determine the potential radiological implications of nuclear facilities in the combined watersheds of the Tennessee and Cumberland rivers, an area covering portions of 7 states of varied topography. The regional population in 1970 was about 4.6 million and is expected to increase to about 7 million by the year 2000. A 1973 projection estimated the installed electric generating capacity of the region to increase from a 1970 value of 45,000 megawatts to a total of 222,000 megawatts by the year 2000. In that year, about 144,000 megawatts were projected to be nuclear plants. The profile of the Tennessee Valley Region in the year 2000, as drawn from this report, contains the essential data for calculation of the radiological dose from operation of nuclear facilities in that year. Those calculations are reported in the companion document, DOE/ET-0064/2. Specifically, Volume I establishes the parameters describing where the people live, what they eat, the activities in which they engage, and the environmental surroundings that enable an evaluation of the potential radiation dose to the population. Airborne radionuclides from nuclear facilities in this zone may enter the study area and be deposited on the ground, on growing food, and on water surfaces. Consideration was not given to waterborne radionuclides external to the study region. 17 references

  15. Sinkhole flooding in Murfreesboro, Rutherford County, Tennessee, 2001-02

    Science.gov (United States)

    Bradley, Michael W.; Hileman, Gregg Edward

    2006-01-01

    The U.S. Geological Survey, in cooperation with the City of Murfreesboro, Tennessee, conducted an investigation from January 2001 through April 2002 to delineate sinkholes and sinkhole watersheds in the Murfreesboro area and to characterize the hydrologic response of sinkholes to major rainfall events. Terrain analysis was used to define sinkholes and delineate the sinkhole drainage areas. Flooding in 78 sinkholes in three focus areas was identified and tracked using aerial photography following three major storms in February 2001, January 2002, and March 2002. The three focus areas are located to the east, north, and northwest of Murfreesboro and are underlain primarily by the Ridley Limestone with some outcrops of the underlying Pierce Limestone. The observed sinkhole flooding is controlled by water inflow, water outflow, and the degree of the hydraulic connection (connectivity) to a ground-water conduit system. The observed sinkholes in the focus areas are grouped into three categories based on the sinkhole morphology and the connectivity to the ground-water system as indicated by their response to flooding. The three types of sinkholes described for these focus areas are pan sinkholes with low connectivity, deep sinkholes with high connectivity, and deep sinkholes with low connectivity to the ground-water conduit system. Shallow, broad pan sinkholes flood as water inflow from a storm inundates the depression at land surface. Water overflow from one pan sinkhole can flow downgradient and become inflow to a sinkhole at a lower altitude. Land-surface modifications that direct more water into a pan sinkhole could increase peak-flood altitudes and extend flood durations. Land-surface modifications that increase the outflow by overland drainage could decrease the flood durations. Road construction or alterations that reduce flow within or between pan sinkholes could result in increased flood durations. Flood levels and durations in the deeper sinkholes observed in

  16. Select metal and metalloid surveillance of free-ranging Eastern box turtles from Illinois and Tennessee (Terrapene carolina carolina).

    Science.gov (United States)

    Allender, Matthew C; Dreslik, Michael J; Patel, Bishap; Luber, Elizabeth L; Byrd, John; Phillips, Christopher A; Scott, John W

    2015-08-01

    The Eastern box turtle (Terrapene carolina carolina) is a primarily terrestrial chelonian distributed across the eastern US. It has been proposed as a biomonitor due to its longevity, small home range, and reliance on the environment to meet its metabolic needs. Plasma samples from 273 free-ranging box turtles from populations in Tennessee and Illinois in 2011 and 2012 were evaluated for presence of heavy metals and to characterize hematologic variables. Lead (Pb), arsenic (As), zinc (Zn), chromium (Cr), selenium (Se), and copper (Cu) were detected, while cadmium (Cd) and silver (Ag) were not. There were no differences in any metal detected among age class or sex. However, Cr and Pb were higher in turtles from Tennessee, while As, Zn, Se, and Cu were higher in turtles from Illinois. Seasonal differences in metal concentrations were observed for Cr, Zn, and As. Health of turtles was assessed using hematologic variables. Packed cell volume was positively correlated with Cu, Se, and Pb in Tennessee. Total solids, a measure of plasma proteins, in Tennessee turtles were positively correlated with Cu and Zn. White blood cell count, a measure of inflammation, in Tennessee turtles was negatively correlated with Cu and As, and positively correlated with Pb. Metals are a threat to human health and the health of an ecosystem, and the Eastern Box Turtle can serve as a monitor of these contaminants. Differences established in this study can serve as baseline for future studies of these or related populations.

  17. A Profile of Elder Abuse and Neglect in Tennessee.

    Science.gov (United States)

    Villas, Paul

    A survey of 35 cases of reported abuse to individuals aged 60 and older in the state of Tennessee sought to determine demographic characteristics of the abused, perpetrators of elder abuse and neglect, types of abuse that occur, and any existence of relationships in elder abuse and neglect between urban and rural counties and eastern and western…

  18. Fault detection of Tennessee Eastman process based on topological features and SVM

    Science.gov (United States)

    Zhao, Huiyang; Hu, Yanzhu; Ai, Xinbo; Hu, Yu; Meng, Zhen

    2018-03-01

    Fault detection in industrial process is a popular research topic. Although the distributed control system(DCS) has been introduced to monitor the state of industrial process, it still cannot satisfy all the requirements for fault detection of all the industrial systems. In this paper, we proposed a novel method based on topological features and support vector machine(SVM), for fault detection of industrial process. The proposed method takes global information of measured variables into account by complex network model and predicts whether a system has generated some faults or not by SVM. The proposed method can be divided into four steps, i.e. network construction, network analysis, model training and model testing respectively. Finally, we apply the model to Tennessee Eastman process(TEP). The results show that this method works well and can be a useful supplement for fault detection of industrial process.

  19. Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449 ampersand D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit

  20. Barge loading facilities in conjunction with wood chipping and sawlog mill, Tennessee River Mile 145. 9R: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    1990-08-01

    The purpose of this Environmental Assessment (EA) is to evaluate the environmental consequences of approving, denying, or adopting reasonable alternatives to a request for barge loading facilities. These facilities would serve a proposed wood chipping and sawlog products operation at Tennessee River Mile (TRM) 145.9, right descending bank, (Kentucky Lake), in Perry County, Tennessee. The site is located between Short Creek and Peters Landing. The applicant is Southeastern Forest Products, L.P. (SFP), Box 73, Linden, Tennessee and the proposed facilities would be constructed on or adjacent to company owned land. Portions of the barge terminal would be constructed on land over which flood easement rights are held by the United States of America and administered by the Tennessee Valley Authority (TVA). The US Army Corps of Engineers (CE) and TVA have regulatory control over the proposed barge terminal facilities since the action would involve construction in the Tennessee River which is a navigable water of the United States. The wood chipping and sawlog products facilities proposed on the upland property are not regulated by the CE or TVA. On the basis of the analysis which follows, it has been determined that a modified proposal (as described herein) would not significantly affect the quality of the human environment, and does not require the preparation of an environmental impact statement. 8 refs.

  1. Federal Facility Agreement Annual Progress Report for Fiscal Year 1999 Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Jacobs Company LLC

    2000-01-01

    Environmental Response, Compensation, and Liability Act and/or the Resource Conservation and Recovery Act. This plan will be implemented by means of a Memorandum of Understanding (MOU) incorporating its terms with the United States EPA and TDEC. The majority of projects described in this report are grouped into five watersheds. They are the East Tennessee Technical Park (ETTP) Watershed (formerly the K-25 Site), the Melton Valley (MV) and Bethel Valley (BV) Watersheds at the Oak Ridge National Laboratory (ORNL), and the Bear Creek Valley (BCV) and Upper East Fork Poplar Creek (UEFPC) Watersheds at the Y-12 Plant.

  2. Appraisal of Hydrologic Information Needed in Anticipation of Lignite Mining in Lauderdale County, Tennessee

    Science.gov (United States)

    Parks, William Scott

    1981-01-01

    Lignite in western Tennessee occurs as lenses or beds at various stratigraphic horizons in the Coastal Plain sediments of Late Cretaceous and Tertiary age. The occurrence of this lignite has been known for many decades, but not until the energy crisis was it considered an important energy resource. In recent years, several energy companies have conducted extensive exploration programs in western Tennessee, and tremendous reserves of lignite have been found. From available information, Lauderdale County was selected as one of the counties where strip-mining of lignite will most likely occur. Lignite in this county occurs in the Jackson and Cockfield Formations, undivided, of Tertiary age. The hydrology of the county is known only from regional studies and the collection of some site-specific data. Therefore, in anticipation of the future mining of lignite, a plan is needed for obtaining hydrologic and geologic information to adequately define the hydrologic system before mining begins and to monitor the effects of strip-mining once it is begun. For this planning effort, available hydrologic, geologic, land use, and associated data were located and compiled; a summary description of the surface and shallow subsurface hydrologic system was prepared: the need for additional baseline hydrologic information was outlined; and plans to monitor the effects of strip-mining were proposed. This planning approach, although limited to a county area, has transferability to other Coastal Plain areas under consideration for strip-mining of lignite.

  3. Development of a protection system for high power klystrons in EAST

    International Nuclear Information System (INIS)

    Feng Jianqiang; Shan Jiafang; Yang Yong; Wang Mao; Wang Dongxia

    2010-01-01

    The energy dissipated on the electrodes of a klystron can be estimated from maximal breakdown current, value of the arc discharge voltage and time of turning off the power supply. It mainly introduces the design of over-current protection of Klystrons for 2.45 G/2 MW LHCD System on EAST. Circuits triggering by an over-current and ignitrons are adopted to protect klystrons. Experiment results prove that the system can protect klystrons efficiently. (authors)

  4. Relating fish health and reproductive metrics to contaminant bioaccumulation at the Tennessee Valley Authority Kingston coal ash spill site.

    Science.gov (United States)

    Pracheil, Brenda M; Marshall Adams, S; Bevelhimer, Mark S; Fortner, Allison M; Greeley, Mark S; Murphy, Cheryl A; Mathews, Teresa J; Peterson, Mark J

    2016-08-01

    A 4.1 million m(3) coal ash release into the Emory and Clinch rivers in December 2008 at the Tennessee Valley Authority's Kingston Fossil Plant in east Tennessee, USA, prompted a long-term, large-scale biological monitoring effort to determine if there are chronic effects of this spill on resident biota. Because of the magnitude of the ash spill and the potential for exposure to coal ash-associated contaminants [e.g., selenium (Se), arsenic (As), and mercury (Hg)] which are bioaccumulative and may present human and ecological risks, an integrative, bioindicator approach was used. Three species of fish were monitored-bluegill (Lepomis macrochirus), redear sunfish (L. microlophus), and largemouth bass (Micropterus salmoides)-at ash-affected and reference sites annually for 5 years following the spill. On the same individual fish, contaminant burdens were measured in various tissues, blood chemistry parameters as metrics of fish health, and various condition and reproduction indices. A multivariate statistical approach was then used to evaluate relationships between contaminant bioaccumulation and fish metrics to assess the chronic, sub-lethal effects of exposure to the complex mixture of coal ash-associated contaminants at and around the ash spill site. This study suggests that while fish tissue concentrations of some ash-associated contaminants are elevated at the spill site, there was no consistent evidence of compromised fish health linked with the spill. Further, although relationships between elevated fillet burdens of ash-associated contaminants and some fish metrics were found, these relationships were not indicative of exposure to coal ash or spill sites. The present study adds to the weight of evidence from prior studies suggesting that fish populations have not incurred significant biological effects from spilled ash at this site: findings that are relevant to the current national discussions on the safe disposal of coal ash waste.

  5. A policy proposal for the introduction of solar home systems in East Timor

    Energy Technology Data Exchange (ETDEWEB)

    Bond, M.; Fuller, R.J.; Aye, Lu [The University of Melbourne, Victoria (AU). Department of Civil and Environmental Engineering, International Technologies Centre (IDTC)

    2007-12-15

    The Government of East Timor aims to increase the rate of household electricity service from 20% to 80% over the next 20 years. With a largely rural population living in sparsely populated, remote locations, solar home systems (SHS) will play an important role in meeting the off-grid component of rural electrification in East Timor. This paper describes current experience and trials in East Timor with solar photovoltaic (PV) technology. It examines the East Timorese context against six 'key features' identified by the World Bank as typically included in solar PV projects: delivery infrastructure; access to finance; rural electrification policy; guarantees for minimum quality; understanding of customer needs; and scaling up capacity building. Of these issues, the authors contend that selection of the delivery infrastructure model is the most critical decision, and that for East Timor, in its present stage of development, a market-driven approach for SHS is unlikely to be successful. A model which subsidises capital costs but seeks full recovery of operating costs is recommended. Irrespective of the delivery infrastructure model, for sustainability, capacity must be developed in a range of other areas, particularly the commercial availability of high-quality components and spare parts; creation of a pool of skilled technicians for installation and maintenance; and development of a robust fee collection and maintenance infrastructure. (author)

  6. A policy proposal for the introduction of solar home systems in East Timor

    International Nuclear Information System (INIS)

    Bond, M.; Fuller, R.J.; Aye, Lu

    2007-01-01

    The Government of East Timor aims to increase the rate of household electricity service from 20% to 80% over the next 20 years. With a largely rural population living in sparsely populated, remote locations, solar home systems (SHS) will play an important role in meeting the off-grid component of rural electrification in East Timor. This paper describes current experience and trials in East Timor with solar photovoltaic (PV) technology. It examines the East Timorese context against six 'key features' identified by the World Bank as typically included in solar PV projects: delivery infrastructure; access to finance; rural electrification policy; guarantees for minimum quality; understanding of customer needs; and scaling up capacity building. Of these issues, the authors contend that selection of the delivery infrastructure model is the most critical decision, and that for East Timor, in its present stage of development, a market-driven approach for SHS is unlikely to be successful. A model which subsidises capital costs but seeks full recovery of operating costs is recommended. Irrespective of the delivery infrastructure model, for sustainability, capacity must be developed in a range of other areas, particularly the commercial availability of high-quality components and spare parts; creation of a pool of skilled technicians for installation and maintenance; and development of a robust fee collection and maintenance infrastructure

  7. Validation of 1989 Tennessee birth certificates using maternal and newborn hospital records.

    Science.gov (United States)

    Piper, J M; Mitchel, E F; Snowden, M; Hall, C; Adams, M; Taylor, P

    1993-04-01

    In 1989, the state of Tennessee adopted a new birth certificate which incorporates changes recommended by the National Center for Health Statistics in the revised US Standard Certificate of Live Birth. The data now being collected are intended to provide improved information for understanding maternal and infant health issues. To assess data quality, the authors compared information reported on the 1989 Tennessee birth certificates with the same data obtained from an ongoing case-control study in which the delivery hospital medical records of mothers and infants were reviewed by trained nurse abstractors using a structured data collection instrument. Cases (n = 1,016) were all infants born in Tennessee in 1989 with birth weights less than 1,500 g or other infants who died during the first 28 days of life. The infants were identified from linked birth-death certificate files. Control infants (n = 634) were randomly selected from the noncase population. The most reliable information obtained from birth certificates was descriptive demographic data and birth weight. The quality of information obtained from the new birth certificate checkboxes varied. Routine medical procedures were better reported on the birth certificates than relatively uncommon conditions and occurrences, even serious ones. Caution is needed in using birth certificate data for assessment of maternal medical risk factors, complications of labor and delivery, abnormal conditions of the newborn, and congenital anomalies, since sensitivity is low.

  8. Evaluating the Impact of Performance Funding in Ohio and Tennessee

    Science.gov (United States)

    Hillman, Nicholas W.; Hicklin Fryar, Alisa; Crespín-Trujillo, Valerie

    2018-01-01

    Today, 35 states use performance-based funding models tying appropriations directly to educational outcomes. Financial incentives should induce colleges to improve performance, but there are several well-documented reasons why this is unlikely to occur. We examine how two of the most robust performance funding states--Tennessee and Ohio--responded…

  9. Kids Count: The State of the Child in Tennessee, 1994.

    Science.gov (United States)

    Tennessee State Commission on Children and Youth, Nashville.

    This Kids Count report examines trends in the well being of Tennessee's children. The statistical portrait is based on 23 indicators of child well being: (1) single-parent families; (2) family income/poverty; (3) children receiving Aid to Families with Dependent Children; (4) students participating in school nutrition programs; (5) teen…

  10. Fiscal Year 1993 Well Plugging and Abandonment Program Summary Report Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    This report is a synopsis of the progress of the well plugging and abandonment program at the Y-12 Plant, Oak Ridge, Tennessee, from October 1993 through August 1994. A total of 57 wells and borings were plugged and abandoned during the period of time covered in this report. All wells and borings were plugged and abandoned in accordance with the Monitoring Well Plugging and Abandonment Plan for the U.S. Department of Energy, Y-12 Plant, Oak Ridge, Tennessee.

  11. Waste management plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Plant Landfill V, and restore the affected floodplain. The waste management plan addresses management and disposition of all wastes generated during the LEFPC remedial action. Most of the solid wastes will be sanitary or construction/demolition wastes and will be disposed of at existing Y- 12 facilities. Some small amounts of hazardous waste are anticipated, along with possible low-level or mixed wastes (> 35 pCi/g). Liquid wastes will be generated which will be sanitary and capable of being disposed of at the Oak Ridge Sewage Treatment Plant, except sanitary sewage.

  12. Waste management plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Plant Landfill V, and restore the affected floodplain. The waste management plan addresses management and disposition of all wastes generated during the LEFPC remedial action. Most of the solid wastes will be sanitary or construction/demolition wastes and will be disposed of at existing Y- 12 facilities. Some small amounts of hazardous waste are anticipated, along with possible low-level or mixed wastes (> 35 pCi/g). Liquid wastes will be generated which will be sanitary and capable of being disposed of at the Oak Ridge Sewage Treatment Plant, except sanitary sewage

  13. Department of Energy Air Emissions Annual Report Oak Ridge Reservation, Oak Ridge, Tennessee 40 Code of Federal Regulations (CFR) 61, Subpart H Calendar Year 2016

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Richard [Oak Ridge Y-12 Plant (Y-12), Oak Ridge, TN (United States)

    2017-06-30

    As defined in the preamble of the final rule, the entire DOE facility on the Oak Ridge Reservation (ORR) must meet the 10 mrem/yr ED standard.1 In other words, the combined ED from all radiological air emission sources from Y-12 National Security Complex (Y-12 Complex), Oak Ridge National Laboratory (ORNL), East Tennessee Technology Park (ETTP), Oak Ridge Institute for Science and Education (ORISE) and any other DOE operation on the reservation must meet the 10 mrem/yr standard. Compliance with the standard is demonstrated through emission sampling, monitoring, calculations and radiation dose modeling in accordance with approved EPA methodologies and procedures. DOE estimates the ED to many individuals or receptor points in the vicinity of ORR, but it is the dose to the maximally exposed individual (MEI) that determines compliance with the standard.

  14. Safety Evaluation Report on Tennessee Valley Authority: Browns Ferry Nuclear Performance Plan: Browns Ferry Unit 2 restart

    International Nuclear Information System (INIS)

    1989-04-01

    This safety evaluation report (SER) on the information submitted by the Tennessee Valley Authority (TVA) in its Nuclear Performance Plan, through Revision 2, for the Browns Ferry Nuclear Power Station and in supporting documents has been prepared by the US Nuclear Regulatory Commission staff. The plan addresses the plant-specific concerns requiring resolution before startup of Unit 2. The staff will inspect implementation of those programs. Where systems are common to Units 1 and 2 or to Units 2 and 3, the staff safety evaluations of those systems are included herein. 3 refs

  15. Tennessee health studies agreement. Annual report for year 4, January 1 - December 31, 1995

    International Nuclear Information System (INIS)

    1996-04-01

    The Tennessee Department of Health (TDH) has completed the fourth full year of the Oak Ridge Health Studies Agreement grant. This report summarizes the accomplishments and concerns of the State for the period January 1, 1995, to December 31, 1995. The focus of work during the fourth grant year was the actual work on the dose reconstruction. The final work plan for Task 5, Plan to Perform a Systematic Document Search was received in November 1994. Final work plans for Task 1, Investigation of Radioiodine from Radioactive Lanthanum Processing; Task 2, Investigation of Mercury Releases from Lithium Enrichment; Task 3, Investigation of Releases of PCBs from Oak Ridge Facilities; and Task 4, Investigation of Releases of Radionuclides from White Oak Creek to the Clinch River, were received in February 1995. Final work plans for Task 6, Investigation of the Quality of Historical Uranium Effluent Monitoring at Oak Ridge Facilities; and Task 7, Additional Screening of Materials Not Evaluated in the Dose Reconstruction Feasibility Study, were received in April 1995. ChemRisk's 4th Quarterly Report, for October through December 1995, is included in Attachment 1. Attachment 2 contains a study which developed a quality improvement program for data imported to the Tennessee Cancer Reporting System and Birth Defects Verification Program

  16. Confirmatory Sampling and Analysis Plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-12-01

    This document describes the organization, strategy, and procedures to be used to confirm that mercury concentrations in soils in the remediated areas are statistically less than, or equal to, the cleanup standard of 400 ppm. It focuses on confirming the cleanup of the stretch of the Lower East Fork Popular Creed flowing from Lake Reality at the Y-12 Plant, through the City of Oak Ridge, to Poplar Creek on the Oak Ridge Reservation and its associated flood plain

  17. Confirmatory Sampling and Analysis Plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    This document describes the organization, strategy, and procedures to be used to confirm that mercury concentrations in soils in the remediated areas are statistically less than, or equal to, the cleanup standard of 400 ppm. It focuses on confirming the cleanup of the stretch of the Lower East Fork Popular Creed flowing from Lake Reality at the Y-12 Plant, through the City of Oak Ridge, to Poplar Creek on the Oak Ridge Reservation and its associated flood plain.

  18. Post-closure permit application for the Upper East Fork Poplar Creek hydrogeologic regime at the Y-12 Plant: New Hope Pond and Eastern S-3 ponds plume. Revision 2

    International Nuclear Information System (INIS)

    1995-02-01

    The intent of this Post-Closure, Permit Application (PCPA) is to satisfy the post-closure permitting requirements of the Tennessee Department of Environment and Conservation (TDEC) Rule 1200-1-11. This application is for the entire Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), which is within the Bear Creek Valley (BCV). This PCPA has been prepared to include the entire East Fork Regime because, although there are numerous contaminant sources within the regime, the contaminant plumes throughout the East Fork Regime have coalesced and can no longer be distinguished as separate plumes. This PCPA focuses on two recognized Resource Conservation and Recovery Act (RCRA) interim status units: New Hope Pond (NHP) and the eastern S-3 Ponds plume. This PCPA presents data from groundwater assessment monitoring throughout the regime, performed since 1986. Using this data, this PCPA demonstrates that NHP is not a statistically discernible source of groundwater contaminants and that sites upgradient of NHP are the likely sources of groundwater contamination seen in the NHP vicinity. As such, this PCPA proposes a detection monitoring program to replace the current assessment monitoring program for NHP

  19. Routine environmental audit of the Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    This report documents the results of the routine environmental audit of the Oak Ridge Y-12 Plant (Y-12 Plant), Anderson County, Tennessee. During this audit, the activities conducted by the audit team included reviews of internal documents and reports from previous audits and assessments; interviews with U.S. Department of Energy (DOE), State of Tennessee regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted August 22-September 2, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). DOE 5482.1 B, {open_quotes}Environment, Safety, and Health Appraisal Program,{close_quotes} establishes the mission of EH-24 to provide comprehensive, independent oversight of DOE environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is enhancement of environmental protection and minimization of risk to public health and the environment. EH-24 accomplishes its mission by conducting systematic and periodic evaluations of DOE`s environmental programs within line organizations, and by using supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  20. A tangential CO{sub 2} laser collective scattering system for measuring short-scale turbulent fluctuations in the EAST superconducting tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Cao, G.M., E-mail: gmcao@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, PO Box 1126, Hefei, Anhui 230031 (China); Li, Y.D. [Institute of Plasma Physics, Chinese Academy of Sciences, PO Box 1126, Hefei, Anhui 230031 (China); Li, Q. [School of Physics and Optoelectronic Engineering, Guangdong University of Technology, Guangzhou 510006 (China); Zhang, X.D.; Sun, P.J.; Wu, G.J.; Hu, L.Q. [Institute of Plasma Physics, Chinese Academy of Sciences, PO Box 1126, Hefei, Anhui 230031 (China)

    2014-12-15

    Highlights: • A tangential CO{sub 2} laser collective scattering system was first installed on EAST. • It can measure the short-scale fluctuations in different regions simultaneously. • It can study the broadband fluctuations, QC fluctuations, MHD phenomenon, etc. - Abstract: A tangential CO{sub 2} laser collective scattering system has been first installed on the Experimental Advanced Superconducting Tokamak (EAST) to measure short-scale turbulent fluctuations in EAST plasmas. The system can measure fluctuations with up to four distinct wavenumbers simultaneously ranging from 10 cm{sup −1} to 26 cm{sup −1}, and correspondingly k{sub ⊥}ρ{sub s}∼1.5−4.3. The system is designed based on the oblique propagation of the probe beam with respect to the magnetic field, and thus the enhanced spatial localization can be achieved by taking full advantage of turbulence anisotropy and magnetic field inhomogeneity. The simultaneous measurements of turbulent fluctuations in different regions can be taken by special optical setup. Initial measurements indicate rich short-scale turbulent dynamics in both core and outer regions of EAST plasmas. The system will be a powerful tool for investigating the features of short-scale turbulent fluctuations in EAST plasmas.

  1. Demonstration of persistent contamination of a cooked egg product production facility with Salmonella enterica serovar Tennessee and characterization of the persistent strain

    DEFF Research Database (Denmark)

    Jakociune, D.; Bisgaard, M.; Pedersen, Karl

    2014-01-01

    Aims: The aim of this study was to investigate whether continuous contamination of light pasteurized egg products with Salmonella enterica serovar Tennessee (S. Tennessee) at a large European producer of industrial egg products was caused by persistent contamination of the production facility......, members of the persistent clone were weak producers of H2S in laboratory medium. S. Tennessee isolated from the case was able to grow better in pasteurized egg product compared with other serovars investigated. Conclusions: It was concluded that the contamination was caused by a persistent strain...... in the production facility and that this strain apparently had adapted to grow in the relevant egg product. Significance and Impact of the Study: S. Tennessee has previously been associated with persistence in hatching facilities. This is the first report of persistent contamination of an egg production facility...

  2. The East African rift system

    Science.gov (United States)

    Chorowicz, Jean

    2005-10-01

    This overview paper considers the East African rift system (EARS) as an intra-continental ridge system, comprising an axial rift. It describes the structural organization in three branches, the overall morphology, lithospheric cross-sections, the morphotectonics, the main tectonic features—with emphasis on the tension fractures—and volcanism in its relationships with the tectonics. The most characteristic features in the EARS are narrow elongate zones of thinned continental lithosphere related to asthenospheric intrusions in the upper mantle. This hidden part of the rift structure is expressed on the surface by thermal uplift of the rift shoulders. The graben valleys and basins are organized over a major failure in the lithospheric mantle, and in the crust comprise a major border fault, linked in depth to a low angle detachment fault, inducing asymmetric roll-over pattern, eventually accompanied by smaller normal faulting and tilted blocks. Considering the kinematics, divergent movements caused the continent to split along lines of preexisting lithospheric weaknesses marked by ancient tectonic patterns that focus the extensional strain. The hypothesis favored here is SE-ward relative divergent drifting of a not yet well individualized Somalian plate, a model in agreement with the existence of NW-striking transform and transfer zones. The East African rift system comprises a unique succession of graben basins linked and segmented by intracontinental transform, transfer and accommodation zones. In an attempt to make a point on the rift system evolution through time and space, it is clear that the role of plume impacts is determinant. The main phenomenon is formation of domes related to plume effect, weakening the lithosphere and, long after, failure inducing focused upper mantle thinning, asthenospheric intrusion and related thermal uplift of shoulders. The plume that had formed first at around 30 Ma was not in the Afar but likely in Lake Tana region (Ethiopia

  3. Work plan addendum for David Witherspoon, Inc., 901 Site Building Characterization, Knoxville, Tennessee

    International Nuclear Information System (INIS)

    1997-01-01

    This building characterization plan was developed as an addendum to the existing site characterization work plan documents, which are in Appendix B of the David Witherspoon, Inc., (DWI) preliminary remedial investigation (RI)/feasibility study (FS). All building characterization activities will be conducted in accordance with the rules of the Hazardous Substance Remedial Action Program under the direction of the Tennessee Department of Environment and Conservation, Division of Superfund (TN Rules 1200-1-3) and its implementing regulations. Additional rules of the state of Tennessee, Comprehensive Environmental Response, Compensation, and Liability Act of 1980, and the U.S. Environmental Protection Agency guidance were consulted during development of this plan. Activities at the DWI site were concerned with scrap metal processing and scrap metal resale

  4. Soil Investigation of Lower East Fork Poplar Creek

    Energy Technology Data Exchange (ETDEWEB)

    Dickson, Johnbull O [ORNL; Mayes, Melanie [ORNL; Earles, Jennifer E [ORNL; Mehlhorn, Tonia L [ORNL; Lowe, Kenneth Alan [ORNL; Peterson, Mark J [ORNL; Pierce, Eric M [ORNL

    2017-03-01

    Mercury is regarded by the US Department of Energy (DOE) Oak Ridge Office of Environmental Management as a priority contaminant on the Oak Ridge Reservation because of the environmental risks associated with substantial losses from buildings, soils, and surface waters at the Y-12 National Security Complex (Y-12). As a result of historical releases of mercury from Y-12 primarily in the 1950s and early 1960s, the lower East Fork Poplar Creek (LEFPC) stream channel and bank soil margins are contaminated with mercury (Brooks and Southworth 2011; Tennessee Valley Authority 1985b, a). A Mercury Remediation Technology Development project is underway to evaluate the nature of downstream mercury contamination and to develop targeted site-specific remedial technologies that can mitigate mercury release and biological uptake. It is known that mercury concentration varies longitudinally and with depth in LEFPC bank soils; however, soil types and soil physical properties are not well known, especially relative to the zones of mercury contamination. Moreover, there are no soil maps for the downstream reaches of LEFPC in Roane County (i.e. from the Chestnut Hill Road downstream) and this work represents the first ever soil mapping along this section of LEFPC.

  5. Design of EAST LHCD high power supply feedback control system based on PLC

    International Nuclear Information System (INIS)

    Hu Huaichuan; Shan Jiafang

    2009-01-01

    Design of EAST LHCD -35kV/5.6MW high power supply feedback control system based on PLC is described. Industrial computer and PLC are used to control high power supply in the system. PID arithmetic is adopted to achieve the feedback control of voltage of high power supply. Operating system is base on real-time operating system of QNX. Good controlling properties and reliable protective properties of the feedback control system are proved by the experiment results. (authors)

  6. Management initiatives to waste management decisions and environmental compliance in Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Jones, C.G.

    1988-01-01

    Martin Marietta Energy Systems, Inc. (MMES) has been the operating contractor for the nuclear production and research facilities at Oak Ridge, Tennessee and Paducah, Kentucky for about four and one-half years. Environmental compliance, regulatory interaction, and public confidence have been very significant issues during this time. This presentation will review the environmental situation in Oak Ridge in 1984 and will discuss management initiatives and experience in the development and implementation of effective environmental and waste management and health and safety programs committed to the protection of the environment, our workers and the public with an overall goal of full compliance with all current and anticipated regulations.

  7. Management initiatives to waste management decisions and environmental compliance in Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Jones, C.G.

    1988-01-01

    Martin Marietta Energy Systems, Inc. (MMES) has been the operating contractor for the nuclear production and research facilities at Oak Ridge, Tennessee and Paducah, Kentucky for about four and one-half years. Environmental compliance, regulatory interaction, and public confidence have been very significant issues during this time. This presentation will review the environmental situation in Oak Ridge in 1984 and will discuss management initiatives and experience in the development and implementation of effective environmental and waste management and health and safety programs committed to the protection of the environment, our workers and the public with an overall goal of full compliance with all current and anticipated regulations

  8. Environmental compliance plan for the Lower East Fork Poplar Creek Remedial Action Project at Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    Remedial action for Lower East Fork Poplar Creek, as defined by the Record of Decision, requires that soil contaminated with >400 ppM mercury be excavated and disposed. Based on the remediation goal, soil will be excavated from areas located at the NOAA site and the Bruner site and disposed at the Industrial Landfill V at the Y-12 Plant. Objective is to minimize the risk to human health and the environment from contaminated soil in the lower EFPC floodplain pursuant to CERCLA and the Federal Facility Agreement (DOE 1992)

  9. Back from the Brink with Something for Everyone - The Final Executed Memorandum of Agreement for Interpretation of the East Tennessee Technology Park and the K-25 Building - 13370

    International Nuclear Information System (INIS)

    Cusick, Lesley T.

    2013-01-01

    , and more. The MOA was designed to offer something for everyone. The MOA for the K- 25 Building and interpretation of the East Tennessee Technology Park (ETTP; formerly the K-25 Site) was executed by all of the signatory parties on August 7, 2012 - almost 67 years to-the-day after the 'product' of the K-25 process building became known to more than just a small group of scientists and engineers working on a secret project for the Army Corps of Engineers Manhattan District. (authors)

  10. Back from the Brink with Something for Everyone - The Final Executed Memorandum of Agreement for Interpretation of the East Tennessee Technology Park and the K-25 Building - 13370

    Energy Technology Data Exchange (ETDEWEB)

    Cusick, Lesley T. [Restoration Services, Inc. (United States)

    2013-07-01

    Oak Ridge, and more. The MOA was designed to offer something for everyone. The MOA for the K- 25 Building and interpretation of the East Tennessee Technology Park (ETTP; formerly the K-25 Site) was executed by all of the signatory parties on August 7, 2012 - almost 67 years to-the-day after the 'product' of the K-25 process building became known to more than just a small group of scientists and engineers working on a secret project for the Army Corps of Engineers Manhattan District. (authors)

  11. Evaluation of seismic damage to bridges and highway systems in Shelby County, Tennessee

    Science.gov (United States)

    Jernigan, John Bailey

    Past earthquakes have demonstrated that bridges are one of the most vulnerable components of highway transportation systems. In addition to bridges, roadways may also be subject to damage, particularly in an area prone to earthquake-induced liquefaction. As a consequence, the highway transportation systems after an earthquake might be impaired and the post-earthquake emergency response might be compromised. Furthermore, the impact on the regional economy might be very significant from the damage to highway systems. Since highway transportation systems are critical lifelines for people living in an urban area, it is important to evaluate the vulnerability of bridges and highway systems in earthquake-prone regions. Memphis and Shelby County, Tennessee are located close to the southwestern segment of the New Madrid seismic zone (NMSZ). This zone produced three of the largest earthquakes in North America in 1811--1812. Presently, the NMSZ is still active and is considered by engineers, seismologists, and public officials as the most hazardous seismic zone in the central and eastern United States. Bridges in the Memphis area were generally not designed for seismic resistance until 1990. Therefore, the majority of existing bridges might suffer damage from earthquakes occurring in the NMSZ. The overall objective of this study is to evaluate the expected damage to bridges and roadways on the major routes in Memphis and Shelby County resulting from New Madrid earthquakes with the aid of geographic information system (GIS) technology. The road network selected for this study includes all the Interstate highway system, all the primary and secondary routes maintained by the state, and most of the major arterial routes. There are 452 bridges on the selected roadway systems and data pertinent to these bridges and roadway systems were collected and implemented as a GIS database. The bridges in the Memphis area were classified into several types and damage states were determined

  12. (Dis Integration and the Emergence of the State System in the Middle East

    Directory of Open Access Journals (Sweden)

    Dr. Imad El-Anis

    2011-07-01

    Full Text Available The fall of the Ottoman Empire during World War One and theemergence of the modern state system in the Middle East have receivedsignificant attention in academic literature. However, the impacts thatthe proliferation of state borders in the 19th and 20th centuries havehad on political and economic integration within the Middle East isoften ignored. This study argues that between the mid-19th and mid-20th centuries the region underwent significant structural changes.Furthermore, these changes were driven by external intervention andinternal decline. A number of theoretical assumptions are positedconcerning the importance on integration and cooperation of thefollowing: the increase in borders and claims to sovereignty and theseparation of peoples/markets. The conclusions drawn are that thechange from a system characterised by large political actors andintegrated markets to one which is characterised by smaller states andseparated markets led to the disintegration of the region’s internalrelations.

  13. Profile of State College and Career Readiness Assessments (CCR) Policy. Tennessee

    Science.gov (United States)

    Center on Education Policy, 2011

    2011-01-01

    This individual profile provides information on Tennessee's college and career readiness assessment policy. Some of the categories presented include: (1) CCR assessment policy; (2) Purpose; (3) Major changes in CCR assessment policy since the 2009-10 school year for financial reasons; (4) State financial support for students to take the CCR…

  14. Happy, healthy, smart cities symposium in Knoxville, Tennessee : a TPCB peer exchange

    Science.gov (United States)

    2017-07-01

    The Happy, Healthy, Smart Cities Symposium was a two-day event, held on March 29-30, 2016 in Knoxville, Tennessee, focused on exploring the impacts that transportation and land use decisions have on health, safety, and quality of life. The event was ...

  15. Postconstruction report for the mercury tanks interim action at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Voskuil, T.L.

    1993-09-01

    Three underground concrete settling tanks (tanks 2101-U, 2104-U, and 2100-U) at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee, contained contaminated sludges contributing mercury to the Upper East Fork Poplar Creek (UEFPC). These tanks were cleaned out as an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act as part of the Reduction of Mercury in Plant Effluent subproject. Cleaning out these tanks prevented the sludge that had settled in the bottom from resuspending and carrying mercury into UEFPC. Tanks 2104-U and 2100-U were returned to service and will continue to receive effluent from buildings 9201-4 and 9201-5. Tank 2101-U had been abandoned and its effluent redirected to Tank 2100-U during previous activities. This interim action permanently sealed Tank 2101-U from the storm sewer system. Upon removal of materials and completion of cleanup, inspections determined that the project`s cleanup criteria had been met. The structural integrity of the tanks was also inspected, and minor cracks identified in tanks 2101-U and 2104-U were repaired. This project is considered to have been completed successfully because it met its performance objectives as addressed in the Interim Record of Decision and the work plan: to remove the waste from the three storage tanks; to ensure that the tanks were cleaned to the levels specified; to return tanks 2100-U and 2104-U to service; to isolate Tank 2101-U permanently; and to manage the wastes in an appropriate fashion.

  16. Postconstruction report for the mercury tanks interim action at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Voskuil, T.L.

    1993-09-01

    Three underground concrete settling tanks (tanks 2101-U, 2104-U, and 2100-U) at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee, contained contaminated sludges contributing mercury to the Upper East Fork Poplar Creek (UEFPC). These tanks were cleaned out as an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act as part of the Reduction of Mercury in Plant Effluent subproject. Cleaning out these tanks prevented the sludge that had settled in the bottom from resuspending and carrying mercury into UEFPC. Tanks 2104-U and 2100-U were returned to service and will continue to receive effluent from buildings 9201-4 and 9201-5. Tank 2101-U had been abandoned and its effluent redirected to Tank 2100-U during previous activities. This interim action permanently sealed Tank 2101-U from the storm sewer system. Upon removal of materials and completion of cleanup, inspections determined that the project's cleanup criteria had been met. The structural integrity of the tanks was also inspected, and minor cracks identified in tanks 2101-U and 2104-U were repaired. This project is considered to have been completed successfully because it met its performance objectives as addressed in the Interim Record of Decision and the work plan: to remove the waste from the three storage tanks; to ensure that the tanks were cleaned to the levels specified; to return tanks 2100-U and 2104-U to service; to isolate Tank 2101-U permanently; and to manage the wastes in an appropriate fashion

  17. Study of electromagnetic noise influence on quench detection system under different discharge conditions for EAST

    International Nuclear Information System (INIS)

    Hu, Yanlan; Li, Jiangang; Shen, Biao; Lv, Huanyu; Xiao, Y.Z.

    2013-01-01

    Highlights: ► Reliable quench detection in EAST is a key issue for steady-state operation. ► The electromagnet noise interference associated with detection signals under different discharge conditions are evaluated. ► The effective measures have been realized on detection systems. ► Recently upgrade work has been done, especially for the optimization of ACS and false FSDS were reduced greatly. -- Abstract: EAST is the first Tokamak device whose toroidal and poloidal magnet are superconducting. The enormous magnetic field energy stored in the magnet system will transfer into thermal energy and cause the damage of superconducting magnet, if a quench happened. Therefore, reliable quench detection is a key issue for steady-state operation. In addition to electromagnetic noise from poloidal magnet fields and plasma current which will experience fast current ramp rate, radio frequency noise from heating system also have some interference on quench detection system to a certain degree. The most difficult point for quench detection system is required to have more detail evaluation on electromagnetic noise interference. Recently experiments have been carried out successfully in EAST device. The steady-state operation with 1 MA of plasma current and more than 100-s plasma duration has been obtained. In the paper, the electromagnetic noise interference on quench detection system under different discharge conditions are analyzed and relative process methods are also introduced. The technological experience and experimental data are significant for the constructing ITER and similar superconducting device have been mentioned which will supply significant technological experience and experimental data for constructing ITER and similar superconducting device

  18. Retrospective on lessons from 1985 Tennessee MRS attempted siting: The local view

    International Nuclear Information System (INIS)

    Peelle, E.

    1991-01-01

    Six years have elapsed since the unsuccessful US Department of Energy (DOE) effort to site a monitored retrievable storage (MRS) facility in Tennessee. The local MRS task force (TF) effort in 1985 has been described extensively in prior publications. These articles described the successful interactions between DOE and the local TF in the context of extensive state and regional opposition. The MRS TF found that while the proposed facility could be safe, many conditions were needed to ensure its long-term safety and to change the net benefit balance from negative to positive. The DOE and the TF reached agreement on many of the TF conditions but were still far apart on others when negotiations ended in 1985. The local governments that had created the TF unanimously accepted its conclusion. The governor of Tennessee eventually vetoed the siting process, and the state sued in 1985 to stop the DOE from continuing its efforts. When Tennessee's legal block was removed in 1987, DOE presented its MRS recommendations to Congress. Two brief periods of activity among the TF and local political leaders included testimony in 1987 before two Congressional committees and before the MRS Study Commission in 1989. This testimony sought those additional conditions for siting the DOE had not given in its negotiations with the TF. The purpose of this paper is to evaluate key points and lessons learned from this path-breaking effort by a local unpaid TF of citizens and elected officials through its entire life until disbanding in 1989

  19. University of Tennessee - Industry collaborative research and development in preventive maintenance technology

    International Nuclear Information System (INIS)

    Upadhyaya, B.R.

    1992-01-01

    The Preventive Maintenance Engineering Laboratory (PMEL) was inaugurated at the University of Tennessee Nuclear Engineering Department in September 1989. The startup funding was provided by Gilbert/Commonwealth, Inc. The purpose of PMEL is to identify maintenance-related problems in the power and process industries and to find their solutions through the development and application of emerging technologies. These include advanced digital signal processing, applied artificial intelligence (AI), artificial neural networks, and reliability based methods. The Laboratory activities are being expanded by the formation of an industrial consortium within the Measurement and Control Engineering Center at the University of Tennessee. Several research and development projects in preventive maintenance are being carried out. These include condition monitoring of air operated valves, automated diagnostics of motor operated valves, instrument calibration, verification, and estimation of expected residual life of electric motors using applied AI technology and reliability-based methods. The new methodology will be applied to other industrial subsystems. A long-term research and development project is being sponsored by the T.V.A. Nuclear Maintenance Department. The overall objective of the research program is to develop and apply advanced artificial intelligence and information processing methods to the problems of plant performance monitoring and preventive maintenance. The program includes the development of a workstation/PC-based, networking of plant information for easy access to operational and management personnel, implementation of a sensor verification system, monitoring of feedwater flow venturi fouling and heat rate balance, and integration of signal validation, command validation, and fault-tolerant control strategies

  20. Master Plan for Tennessee Schools: Preparing for the 21st Century.

    Science.gov (United States)

    Tennessee State Board of Education, Nashville.

    The Education Improvement Act (EIA) was passed in Tennessee in 1992. It established the Basic Education Program (BEP) as the funding formula used to provide adequate, equitable, and sustainable school funding. The 1997 master plan is consistent with the national Goals 2000 legislation and addresses each of the eight national goals. The plan…

  1. Optics System Design of Microwave Imaging Reflectometry for the EAST Tokamak

    International Nuclear Information System (INIS)

    Zhu Yilun; Zhao Zhenling; Tong Li; Chen Dongxu; Xie Jinlin; Liu Wandong

    2016-01-01

    A front-end optics system has been developed for the EAST microwave imaging reflectometry for 2D density fluctuation measurement. Via the transmitter optics system, a combination of eight transmitter beams with independent frequencies is employed to illuminate wide poloidal regions on eight distinct cutoff layers. The receiver optics collect the reflected wavefront and project them onto the vertical detector array with 12 antennas. Utilizing optimized Field Curvature adjustment lenses in the receiver optics, the front-end optics system provides a flexible and perfect matching between the image plane and a specified cutoff layer in the plasma, which ensures the correct data interpretation of density fluctuation measurement. (paper)

  2. DESIGN OF A SYSTEM TO RETRIEVE SLUDGE FROM THE K EAST SPENT FUEL BASIN AT HANFORD

    International Nuclear Information System (INIS)

    Twitchell, A.L.; MacLean, G.T.; Ho, Q.T.; Fort, D.L.

    2003-01-01

    This paper describes the Sludge Retrieval System (SRS), which was designed to safely remove radioactive sludge from the K East spent fuel basin at the 100 K Area of the Hanford Site. Basin water and sludge have the potential to leak to the environment due to the age and condition of the basins. Since the 100 K Area spent fuel basins are located next to the Columbia River, the Spent Nuclear Fuel Project mission includes the safe removal, containment, and transportation of sludge from the basins to a secure storage location. The scope of the SRS includes: A system capable of retrieving sludge from the K East basin floor, pits, and fuel canisters; Separation of debris from sludge, where debris is defined as any material greater than 0.64 cm (0.25 in.) in diameter; Collection of sludge particles in a container that can be transported away from the basin; Modifications to the K East basin to allow installation of the SRS. The SRS was designed by Fluor Federal Services. Changes to the designed system were made by Fluor Hanford as a result of full-scale testing performed after design. This paper discusses this testing, as well as operation and control of the system. Construction and startup testing was initially scheduled to be complete by the end of December 2002. Startup of the system is now expected in April 2003

  3. Automatic Clock and Time Signal System of the Astronomical Agency in East Asia Area

    Science.gov (United States)

    Lee, Yong Sam

    2009-09-01

    We analysed the old automatic clock and time signal system that was used by the national astronomical agency in East Asian Area. Jagyeongnu is a kind of water clock that was operated by the flowing water in Joseon Dynasty. Seowoongwan managed the water clock so as to keep the standard time system in the dynasty from the 16th year (1434) of King Sejong's reign. In 1438 the Okru that was invented in the period. Such kind of clock system already was used in China, which was Shui yun i hsiang t'ai (?) in 1092. During the period Joseon Dynasty, China and Japan had been kept the time system that one day is divided into 12 shin (?2?) or 100 gak (?). However detailed part of the system had a little difference among the three countries. Though the whole system of water clock in Joseon had manufactured on the basis of Chinese, it had been gradually developed by own method and idea. In this study we show the historical records of the standard time keeping system in East Asian history. And then we can inform materials on the structure and functional devises for the purpose of new restoration models about the automatic clock and time system.

  4. Remedial investigation work plan for the Upper East Fork Poplar Creek Characterization Area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-03-01

    More than 200 contaminated sites created by past waste management practices have been identified at the Y-12 Plant. Many of the sites have been grouped into operable units based on priority and on investigative and remediation requirements. The Y-12 Plant is one of three major facilities on the ORR. The ORR contains both hazardous and mixed-waste sites that are subject to regulations promulgated under the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986. Under RCRA guidelines and requirements from the Tennessee Department of Environment and Conservation (TDEC), the Y-12 Plant initiated investigation and monitoring of various sites within its boundaries in the mid-1980s. The entire ORR was placed on the National Priorities List (NPL) of CERCLA sites in November 1989. Following CERCLA guidelines, sites under investigation require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) of potential remedial actions

  5. Underground storage tank management plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The Underground Storage Tank (UST) Program at the Oak Ridge Y-12 Plant was established to locate UST systems at the facility and to ensure that all operating UST systems are free of leaks. UST systems have been removed or upgraded in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance. With the closure of a significant portion of the USTs, the continuing mission of the UST Management Program is to manage the remaining active UST systems and continue corrective actions in a safe regulatory compliant manner. This Program outlines the compliance issues that must be addressed, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Program provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. The plan is divided into three major sections: (1) regulatory requirements, (2) active UST sites, and (3) out-of-service UST sites. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Program, and the procedures and guidance for compliance.

  6. Underground storage tank management plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-09-01

    The Underground Storage Tank (UST) Program at the Oak Ridge Y-12 Plant was established to locate UST systems at the facility and to ensure that all operating UST systems are free of leaks. UST systems have been removed or upgraded in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance. With the closure of a significant portion of the USTs, the continuing mission of the UST Management Program is to manage the remaining active UST systems and continue corrective actions in a safe regulatory compliant manner. This Program outlines the compliance issues that must be addressed, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Program provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. The plan is divided into three major sections: (1) regulatory requirements, (2) active UST sites, and (3) out-of-service UST sites. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Program, and the procedures and guidance for compliance

  7. In-Situ Measurements of Low Enrichment Uranium Holdup Process Gas Piping at K-25 - Paper for Waste Management Symposia 2010 East Tennessee Technology Park Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Rasmussen, B.

    2010-01-01

    This document is the final version of a paper submitted to the Waste Management Symposia, Phoenix, 2010, abstract BJC/OR-3280. The primary document from which this paper was condensed is In-Situ Measurement of Low Enrichment Uranium Holdup in Process Gas Piping at K-25 Using NaI/HMS4 Gamma Detection Systems, BJC/OR-3355. This work explores the sufficiency and limitations of the Holdup Measurement System 4 (HJVIS4) software algorithms applied to measurements of low enriched uranium holdup in gaseous diffusion process gas piping. HMS4 has been used extensively during the decommissioning and demolition project of the K-25 building for U-235 holdup quantification. The HMS4 software is an integral part of one of the primary nondestructive assay (NDA) systems which was successfully tested and qualified for holdup deposit quantification in the process gas piping of the K-25 building. The initial qualification focused on the measurement of highly enriched UO 2 F 2 deposits. The purpose of this work was to determine if that qualification could be extended to include the quantification of holdup in UO 2 F 2 deposits of lower enrichment. Sample field data are presented to provide evidence in support of the theoretical foundation. The HMS4 algorithms were investigated in detail and found to sufficiently compensate for UO 2 F 2 source self-attenuation effects, over the range of expected enrichment (4-40%), in the North and East Wings of the K-25 building. The limitations of the HMS4 algorithms were explored for a described set of conditions with respect to area source measurements of low enriched UO 2 F 2 deposits when used in conjunction with a 1 inch by 1/2 inch sodium iodide (NaI) scintillation detector. The theoretical limitations of HMS4, based on the expected conditions in the process gas system of the K-25 building, are related back to the required data quality objectives (DQO) for the NBA measurement system established for the K-25 demolition project. The combined

  8. 77 FR 51739 - Approval and Promulgation of Implementation Plans; Tennessee; Regional Haze State Implementation...

    Science.gov (United States)

    2012-08-27

    ... Tennessee: (1) Aluminum Company of America (Alcoa)--South Plant; (2) DuPont White Pigment and Mineral... reductions than BART (i.e., dispersion modeling is not required to evaluate the differences in visibility...

  9. Forecasting of Currency Crises in East Asia

    Directory of Open Access Journals (Sweden)

    Chi-Young Song

    2005-06-01

    Full Text Available In this paper, we have developed a forecasting system for currency crisis in East Asia based on a signaling approach. Our system uses 15 monthly indicators of five East Asian countries including Indonesia, Korea, Malaysia, the Philippines and Thailand that were severely hit by the currency crisis in 1997. We investigate the performance of the system through deploying out-of-sample forecasting for the periods both before and after the 1997 East Asian currency crisis. Unlike the existing research based on the signaling approach, our out-of-sample forecasting does not fix the in-sample period. The out-of-sample forecasting between July 1995 and June 1997 shows that prior to breakout of the crisis, several indicators including real exchange rates and exports sent frequent warnings to all crisis-hit East Asian countries except the Philippines. This may indicate that a signaling-based early warning system for currency crisis could have been an useful method of forecasting the East Asian crisis. On the other hand, we also find that our forecasting system often generates warning signals during the out-of-sample period between July 1999 and June 2001. Since we have not observed any currency crisis in this region after 1998, these are all false alarms, indicating that our system may be seriously exposed to the type II error. We can, however, mitigate this problem if we adjust the optimal critical values of indicators depending on the preferences of forecasting system manager.

  10. Bioavailability of mercury in East Fork Poplar Creek soils

    International Nuclear Information System (INIS)

    Barnett, M.O.; Turner, R.R.

    1995-05-01

    The initial risk assessment for the East Fork Poplar Creek (EFPC) floodplain in Oak Ridge, Tennessee, a superfund site heavily contaminated with mercury, was based upon a reference dose for mercuric chloride, a soluble mercury compound not expected to be present in the floodplain, which is frequently saturated with water. Previous investigations had suggested mercury in the EFPC floodplain was less soluble and therefore less bioavailable than mercuric chloride, possibly making the results of the risk assessment unduly conservative. A bioavailability study, designed to measure the amount of mercury available for absorption in a child's digestive tract, the most critical risk endpoint and pathway, was performed on twenty soils from the EFPC floodplain. The average percentage of mercury released during the study for the twenty soils was 5.3%, compared to 100% of the compound mercuric chloride subjected to the same conditions. Alteration of the procedure to test additional conditions possible during soil digestion did not appreciably alter the results. Therefore, use of a reference dose for mercuric chloride in the EFPC risk assessment without inclusion of a corresponding bioavailability factor may be unduly conservative

  11. Nuclear criticality safety program at the University of Tennessee-Knoxville

    International Nuclear Information System (INIS)

    Basoglu, B.; Bentley, C.; Brewer, R.; Dunn, M.; Haught, C.; Plaster, M.; Wilkinson, A.; Dodds, H.; Elliott, E.; Waddell, W.

    1993-01-01

    This paper presents an overview of the nuclear criticality safety (NCS) educational program at the University of Tennessee-Knoxville. The program is an academic specialization for nuclear engineering graduate students pursuing either the MS or PhD degree and includes special NCS courses and NCS research projects. Both the courses and the research projects serve as partial fulfillment of the requirements for the degree being pursued

  12. Effects of Headcutting on the Bottomland Hardwood Wetlands Adjacent to the Wolf River, Tennessee

    National Research Council Canada - National Science Library

    Weins, Karen

    2003-01-01

    The Wolf River in western Tennessee has experienced severe channel erosion in the form of headcutting and downcutting that has extended 17 kilometers upstream from the location at which channelization ceased in 1964...

  13. Water Quality Survey of Splash Pads After A Waterborne Salmonellosis Outbreak--Tennessee, 2014.

    Science.gov (United States)

    Clayton, Joshua L; Manners, Judy; Miller, Susan; Shepherd, Craig; Dunn, John R; Schaffner, William; Jones, Timothy F

    2017-06-01

    Waterborne outbreaks of salmonellosis are uncommon. The Tennessee Department of Health investigated a salmonellosis outbreak of 10 cases with the only common risk factor being exposure to a single splash pad. Risks included water splashed in the face at the splash pad and no free residual chlorine in the water system. We surveyed water quality and patron behaviors at splash pads statewide. Of the 29 splash pads participating in the water quality survey, 24 (83%) used a recirculating water system. Of the 24, 5 (21%) water samples were tested by polymerase chain reaction and found to be positive for E. coli, Giardia, norovirus, or Salmonella. Among 95 patrons observed, we identified common high-risk behaviors of sitting on the fountain or spray head and putting mouth to water. Water venue regulations and improved education of patrons are important to aid prevention efforts.

  14. Education of the rural surgeon: experience from Tennessee.

    Science.gov (United States)

    Giles, W Heath; Arnold, Joshua D; Layman, Thomas S; Sumida, Michael P; Brown, Preston W; Burns, R Phillip; Cofer, Joseph B

    2009-12-01

    The rural surgery rotation that is contained within the general surgery residency program at The University of Tennessee College of Medicine-Chattanooga is described in this article. The advantages of this experience, including the extensive endoscopy experience and the close exposure to practicing general surgeons, are also outlined. The rotation receives uniformly positive evaluations from residents at completion, and it has become the primary gastrointestinal endoscopy educational experience in this program. The description serves as a model that can be used by other programs to construct a rural surgery rotation.

  15. With State Support Now Tied to Completion, Tennessee Colleges Must Refocus

    Science.gov (United States)

    Kelderman, Eric

    2012-01-01

    Before last year, public colleges in Tennessee had a very good reason to fill classroom seats through the first couple of weeks of the term. Each institution's share of the state appropriations for higher education was largely based on enrollment at that point in the semester. Now, however, those colleges stand to lose state money if students do…

  16. Channelization and floodplain forests: impacts of accelerated sedimentation and valley plug formation on floodplain forests of the Middle Fork Forked Deer River, Tennessee, USA

    Science.gov (United States)

    Sonja N. Oswalt; Sammy L. King

    2005-01-01

    We evaluated the severe degradation of floodplain habitats resulting from channelization and concomitant excessive coarse sedimentation on the Middle Fork Forked Deer River in west Tennessee from 2000 to 2003. Land use practices have resulted in excessive sediment in the tributaries and river system eventually resulting in sand deposition on the floodplain, increased...

  17. Psychology Educators of Tennessee (PET): A Regional Learning Community for Psychology Teachers

    Science.gov (United States)

    Kelly, Kiesa; Jones, Linda; Brinthaupt, Thomas M.; Hart, Wendy

    2016-01-01

    This paper describes the development of a regional psychology teaching organisation, Psychology Educators of Tennessee (PET). PET is designed to enhance collaboration among teachers from local colleges, universities, and high schools. We discuss the history of PET, the themes and pragmatics associated with our annual conference, plans for…

  18. Design of the klystron filament power supply control system for EAST LHCD

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Zege; Wang, Mao; Hu, Huaichuan; Ma, Wendong; Zhou, Taian; Zhou, Faxin; Liu, Fukun; Shan, Jiafang [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China)

    2016-09-15

    A filament is a critical component of the klystron used to heat the cathode. There are totally 44 klystrons in experimental advanced superconducting tokamak (EAST) lower hybrid current drive (LHCD) systems. All klystron filaments are powered by AC power suppliers through isolated transformers. In order to achieve better klystron preheat, a klystron filament power supply control system is designed to obtain the automatic control of all filament power suppliers. Klystron filament current is measured by PLC and the interlock between filament current and klystron high voltage system is also implemented. This design has already been deployed in two LHCD systems and proves feasible completely.

  19. 76 FR 46632 - Endangered and Threatened Wildlife and Plants; Removal of Echinacea tennesseensis (Tennessee...

    Science.gov (United States)

    2011-08-03

    ... Echinacea only supported recognition of one of the five varieties of E. pallida that Binns et al. (2002, pp.... 2). These middle Tennessee habitats typically occur on thin plates of Lebanon limestone that are...

  20. Humans and Seagrasses in East Africa : A social-ecological systems approach

    OpenAIRE

    de la Torre-Castro, Maricela

    2006-01-01

    The present study is one of the first attempts to analyze the societal importance of seagrasses (marine flowering plants) from a Natural Resource Management perspective, using a social-ecological systems (SES) approach. The interdisciplinary study takes place in East Africa (Western Indian Ocean, WIO) and includes in-depth studies in Chwaka Bay, Zanzibar, Tanzania. Natural and social sciences methods were used. The results are presented in six articles, showing that seagrass ecosystems are ri...

  1. Binding, distribution, and plant uptake of mercury in a soil from Oak Ridge, Tennessee, USA.

    Science.gov (United States)

    Han, Fengxiang X; Su, Yi; Monts, David L; Waggoner, Charles A; Plodinec, M John

    2006-09-15

    A large amount of mercury has been discharged on the U.S. Department of Energy's Oak Ridge Site (Tennessee) as a part of the U.S. nuclear weapon program during the 1950s through the early 1960s. Increases in mercury concentration in fish and in lower East Fork Poplar Creek of Oak Ridge have been recently reported. This is an experimental study mimicking the initial stage of transformation and redistribution of mercury in soils, which are comparable to those of the Oak Ridge site. The objectives of this study were to investigate potential transformation, distribution, and plant uptake of mercury compounds in soils. Results show that the H(2)O(2)-oxidizable mercury fraction (organically bound mercury) was the major solid-phase fraction in soils freshly contaminated with soluble mercury compounds, while cinnabar fraction was the major solid phase fraction in soils contaminated with HgS. Langmuir relationships were found between mercury concentrations in plant shoots and in soil solid-phase components. Mercury in HgS-contaminated soils was to some extent phytoavailable to plants. Mercury transformation occurred from more labile fractions into more stable fractions, resulting in strong binding of mercury and decreasing its phytoavailability in soils. In addition, high mercury losses from soils contaminated with soluble mercury compounds were observed during a growing season through volatilization, accounting for 20-62% of the total initial mercury in soils.

  2. Second report on the Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program for East Fork Poplar Creek

    Energy Technology Data Exchange (ETDEWEB)

    Hinzman, R.L. [ed.; Adams, S.M. [Oak Ridge National Lab., TN (United States); Black, M.C. [Oklahoma State Univ., Stillwater, OK (United States)] [and others

    1993-06-01

    As stipulated in the National Pollutant Discharge Elimination System (NDPES) permit issued to the Oak Ridge Y-12 Plant on May 24, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream, East Fork Poplar Creek (EFPC). The objectives of BMAP are (1) to demonstrate that the current effluent limitations established for the Y-12 Plant protect the classified uses of EFPC (e.g., the growth and propagation of fish and aquatic life), as designated by the Tennessee Department of Environment and Conservation (TDEC) and (2) to document the ecological effects resulting from implementation of a Water Pollution Control Program that includes construction of several large wastewater treatment facilities. BMAP consists of four major tasks: (1) ambient toxicity testing; (2) bioaccumulation studies; (3) biological indicator studies; and (4) ecological surveys of stream communities, including periphyton (attached algae), benthic (bottom-dwelling) macroinvertebrates, and fish. This document, the second in a series of reports on the results of the Y-12 Plant BMAP, describes studies that were conducted between July 1986 and July 1988, although additional data collected outside this time period are included, as appropriate.

  3. Second report on the Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program for East Fork Poplar Creek

    International Nuclear Information System (INIS)

    Hinzman, R.L.; Black, M.C.

    1993-06-01

    As stipulated in the National Pollutant Discharge Elimination System (NDPES) permit issued to the Oak Ridge Y-12 Plant on May 24, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream, East Fork Poplar Creek (EFPC). The objectives of BMAP are (1) to demonstrate that the current effluent limitations established for the Y-12 Plant protect the classified uses of EFPC (e.g., the growth and propagation of fish and aquatic life), as designated by the Tennessee Department of Environment and Conservation (TDEC) and (2) to document the ecological effects resulting from implementation of a Water Pollution Control Program that includes construction of several large wastewater treatment facilities. BMAP consists of four major tasks: (1) ambient toxicity testing; (2) bioaccumulation studies; (3) biological indicator studies; and (4) ecological surveys of stream communities, including periphyton (attached algae), benthic (bottom-dwelling) macroinvertebrates, and fish. This document, the second in a series of reports on the results of the Y-12 Plant BMAP, describes studies that were conducted between July 1986 and July 1988, although additional data collected outside this time period are included, as appropriate

  4. Design of a System to Retrieve Sludge from the K East Spent Fuel Basin at Hanford

    International Nuclear Information System (INIS)

    TWITCHELL, A.L.

    2003-01-01

    This paper describes the Sludge Retrieval System (SRS), which was designed to safely remove radioactive sludge from the K East spent fuel basin at the 100 K Area of the Hanford Site. Basin water and sludge have the potential to leak to the environment due to the age and condition of the basins. Since the 100 K Area spent fuel basins are located next to the Columbia River, the Spent Nuclear Fuel Project mission includes the safe removal, containment, and transportation of sludge from the basins to a secure storage location. The scope of the SRS includes: (1) a system capable of retrieving sludge from the K East basin floor, pits, and fuel canisters; (2) separation of debris from sludge, where debris is defined as any material greater than 0.64 cm (0.25 in.) in diameter; (3) collection of sludge particles in a container that can be transported away from the basin; and (4) modifications to the K East basin to allow installation of the SRS. The SRS was designed by Fluor Federal Services. Changes to the designed system were made by Fluor Hanford as a result of full-scale testing performed after design. This paper discusses this testing, as well as operation and control of the system. Construction and startup testing was initially scheduled to be complete by the end of December 2002. Startup of the system is now expected in April 2003

  5. Calendar Year 2008 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Elvado Environmental LLC

    2009-12-01

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2008 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2008 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2008 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2008 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the

  6. Demonstration of persistent contamination of a cooked egg product production facility with Salmonella enterica serovar Tennessee and characterization of the persistent strain.

    Science.gov (United States)

    Jakočiūnė, D; Bisgaard, M; Pedersen, K; Olsen, J E

    2014-08-01

    The aim of this study was to investigate whether continuous contamination of light pasteurized egg products with Salmonella enterica serovar Tennessee (S. Tennessee) at a large European producer of industrial egg products was caused by persistent contamination of the production facility and to characterize the persistent strains. Seventy-three S. Tennessee isolates collected from products over a 3-year period with intermittent contamination, and 15 control strains were compared by pulsed field gel electrophoresis (PFGE) using two enzymes. Forty-five case isolates distributed throughout the full period were shown to belong to one profile type. Isolates representing different PFGE profiles were all assigned to ST 319 by multilocus sequence typing (MLST). The case isolates did not show a higher ability to form biofilm on a plastic surface than noncase isolates. Characteristically, members of the persistent clone were weak producers of H2 S in laboratory medium. S. Tennessee isolated from the case was able to grow better in pasteurized egg product compared with other serovars investigated. It was concluded that the contamination was caused by a persistent strain in the production facility and that this strain apparently had adapted to grow in the relevant egg product. S. Tennessee has previously been associated with persistence in hatching facilities. This is the first report of persistent contamination of an egg production facility with this serovar. © 2014 The Society for Applied Microbiology.

  7. Recent progress of the ECE diagnostics on EAST

    International Nuclear Information System (INIS)

    Liu, Y.; Ling, B.L.; Han, X.

    2013-01-01

    On EAST, a 32-channel radiometer system with wider frequency range and better spatial resolution has been commissioned in 2012, and a Michelson interferometer system from JET was relocated very recently. These systems together with the systems we already have, satisfy the requirement of the electron cyclotron emission measurements on EAST for a wide range of toroidal magnetic field. (author)

  8. Quality Assurance Plan for the Upper East Fork Poplar Creek Characterization Area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-12-01

    This quality assurance plan summarizes requirements for conducting work on the Upper East 9 Fork Poplar Creek (UEFPC) Characterization Area (CA). The reader is referred to the Expanded Task Work Agreement for Upper East Fork Poplar Creek Characterization Area, Remedial Investigation/Feasibility Study (RI/FS) for details regarding the activities, roles, and responsibilities summarized here. UEFPC is designated a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site and thus requires a remedial investigation (RI) and a feasibility study (FS). The RI objectives are to evaluate the nature and extent of known and suspected contaminates, to provide data to perform baseline ecological and human health risk assessments, and to support development and evaluation of remedial alternatives for the FS,. Existing data will be used as much as possible. Additional sampling may be required to fill data gaps. The goal of the RI is to prioritize the major sources of contaminants to exit pathways and to understand their characteristics for risk characterization and development of remedial alternatives. The FS objectives are to investigate technologies and develop and evaluate alternatives based on 2031 CERCLA guidance

  9. Seat belt, DWI, and other traffic violations among recent immigrants in Florida and Tennessee.

    Science.gov (United States)

    2013-05-01

    Phase I of this project identified two States, Florida and Tennessee, that maintain information on drivers traffic violations and residency status. : Phase II analyzed State databases to examine seat belt nonuse, DWI, and other traffic safety viol...

  10. Implementation plan for liquid low-level radioactive waste tank systems at Oak Ridge National Laboratory under the Federal Facility Agreement, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-06-01

    This document is an annual revision of the plans and schedules for implementing the Federal Facility Agreement (FFA) compliance program, originally submitted in ES/ER-17 ampersand D1, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. This document summarizes the progress that has been made to date in implementing the plans and schedules for meeting the FFA commitments for the Liquid Low-Level Waste (LLLW) System at Oak Ridge National Laboratory (ORNL). Information presented in this document provides a comprehensive summary to facilitate understanding of the FFA compliance program for LLLW tank systems and to present plans and schedules associated with remediation, through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process, of LLLW tank systems that have been removed from service. ORNL has a comprehensive program underway to upgrade the LLLW system as necessary to meet the FFA requirements. The tank systems that are removed from service are being investigated and remediated through the CERCLA process. Waste and risk characterizations have been submitted. Additional data will be prepared and submitted to EPA/TDEC as tanks are taken out of service and as required by the remedial investigation/feasibility study (RI/FS) process. Chapter 1 provides general background information and philosophies that lead to the plans and schedules that appear in Chapters 2 through 5

  11. Post construction report for Lower East Fork Poplar Creek Project, Phase 1, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-11-01

    This Phase 1 Remedial Action (RA) effort was conducted in accordance with the Record of Decision (ROD) for Lower East Fork Poplar Creek (LEFPC) as a Comprehensive Environmental Response, Compensation, and Liability Act action. The LEFPC, Phase 1 RA removed approximately 5,560 yd 3 of mercury-contaminated soils, ≥ 400 ppm, from selected portions of the National Oceanographic and Atmospheric Administration (NOAA) site LEFPC floodplain from July 8, 1996--September 14, 1996. During excavation activities, pockets of elevated radiologically contaminated soils (greater than 35 pCi/g) were located by the continuous monitoring of the excavation areas and contaminated soils with radiological monitoring instruments. Through characterization sampling it has been determined that ∼ 90 yd 3 are less than 35 pCi/g uranium contaminated and will be transported to the Y-12 Landfill V for disposal and the remaining ∼40 yd 3 do not meet the WAC for radiological constituents included in the Special Waste Permit for Landfill V. The radiologically contaminated soil will be placed in 21st Century containers for storage at the K-25 site

  12. Recommendations concerning Tennessee's hazardous waste management policies by a task force representing generators, environmentalists, and other key constituencies

    International Nuclear Information System (INIS)

    Colglazier, E.W.; English, M.R.

    1987-01-01

    Four recommendations are proposed. 1) A Governor's Roundtable on Hazardous and Solid Wastes should be established to ensure that Tennessee have sound policies and plans for waste management, adequate waste treatment and disposal capacity, and the means to meet the October, 1989 deadline for certification of hazardous waste capacity. 2) Opportunities for early public information and participation in Tennessee's RCRA permitting process should be improved. 3) A Superfund Public Involvement Task Force should be appointed by the Commissioner of Health and Environment to find ways to ensure that a community affected by a Tennessee Superfund site has early and adequate opportunities for information and involvement. 4) Communications about hazardous waste issues should be improved by the appointment of a hazardous waste information officer, the establishment of a Speakers Bureau, the funding of the UT Center for Industrial Services' Hazardous Waste Extension Program, establishment of a crisis situation network of consultants for communities, and exploration of the possibility of Amnesty Days for household hazardous waste and for small-quantity generators waste

  13. Evaluation of Skills Needed in College Education by Colleges of Agriculture Alumni from 1862 and 1890 Land Grant Universities in Alabama and Tennessee

    Science.gov (United States)

    Zekeri, Andrew A.; Baba, Pauline A.

    2014-01-01

    The purpose of this study is to examine college skills Alumni from 1862 and 1890 Land-Grant universities in Alabama and Tennessee rated as essential to acquire in their college education. The data are from a survey of colleges of agriculture alumni who graduated from six land-grant universities in Alabama and Tennessee. IBM SPSS Statistical…

  14. Secure Control Systems for the Energy Sector

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Lab., Inc., Alpharetta, GA (United States); Stewart, John [Tennessee Valley Authority, Knoxville, TN (United States); Chavez, Adrian [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-10-22

    The Padlock Project is an alliance between Tennessee Valley Authority (TVA), Sandia National Laboratories (SNL), and Schweitzer Engineering Laboratories Inc. (SEL). SEL is the prime contractor on the Padlock project. Rhett Smith (SEL) is the project director and Adrian Chaves (SNL) and John Stewart (TVA) are principle investigators. SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. The Tennessee Valley Authority, a corporation owned by the U.S. government, provides electricity for 9 million people in parts of seven southeastern states at prices below the national average. TVA, which receives no taxpayer money and makes no profits, also provides flood control, navigation and land management for the Tennessee River system and assists utilities, and state and local governments with economic development.

  15. Simulated effects of increased groundwater withdrawals in the Cave Springs area, Hixson, Tennessee

    Science.gov (United States)

    Haugh, Connor J.

    2014-01-01

    Concern for future water supplies in Tennessee has grown in recent years as a result of increased awareness of competing needs, the impact of droughts, and the need for more water to support growing populations. The U.S. Geological Survey conducts investigations to improve the knowledge about interactions of geology, climate, humans, and ecosystems with the water cycle, which is critical to understanding and optimizing water availability. The Hixson Utility District in Hamilton County, Tennessee, uses groundwater resources in the Cave Springs area as a water supply, withdrawing water from two well fields located at Cave Springs and Walkers Corner. Historically, Hixson Utility District has withdrawn about 5 million gallons per day (Mgal/d) at the Cave Springs well field and between 2 and 3 Mgal/d at the Walkers Corner well field. To assess the capacity of the groundwater resources in the Cave Springs area to meet future demands, four different scenarios of increased groundwater withdrawals were analyzed using computer model simulations.

  16. Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed chemical processing systems at Building 9212, Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is located within the Y-12 Plant on DOE's Oak Ridge Reservation in Oak Ridge, Tennessee. The proposed replacement system would be based upon modern design criteria and safety analyses. The replacement AHF supply and distribution system equipment would be located on the existing Dock 8/8A at Building 9212. Utilities would be extended to the dock to service the process equipment. The following process equipment modules would be prefabricated for installation at the modified dock: an AHF cylinder enclosure, an AHF supply manifold and vaporizer module, an AHF sump tank and transfer skid, and an AHF supply off-gas scrubber assembly module. The fluidized-bed reactor system would be constructed in an area adjacent to the existing system in Building 9212. The replacement equipment would consist of a new reduction fluidized-bed reactor, a hydrofluorination fluidized-bed reactor, and associated air emission control equipment. The no-action alternative, which is the continued operation of the existing AHF supply and fluidized-bed reactor systems, was also evaluated

  17. Phytogeography of the tropical north-east African mountains

    Directory of Open Access Journals (Sweden)

    I. Friis

    1983-11-01

    Full Text Available The tropical north-east African mountains are tentatively divided into four phytochoria, the formal rank of which is not defined. The division is based on patterns of distribution and endemism in the region. The recognition of a distinct Afromontane phytochorion is now well established (Chapman & White, 1970; Werger, 1978; White, 1978. However, there is still very little information on the phytogeography of the individual mountains or mountain systems. This study hopes to fill a little of the gap by analysing distribution patterns and patterns of endemism in the flora of the tropical north-east African mountains. The north-east African mountain system is the largest in tropical Africa (see e.g. map in White, 1978. At the core of this system is the large Ethiopian massif, around which are located various mountains and mountain chains. These include the Red Sea Hills in the Sudan, the mountain chain in northern Somalia, the south-west Arabian mountains, and the Imatong mountains of south-east Sudan. The latter are often referred to the East African mountain system (White, 1978 but. as I will point out later, they also have a close connection with the south-west highlands of Ethiopia. The paper presents some results of my study of the mountain flora of tropical north-east Africa, particularly the forest species. Where no source is indicated, the data are from my own unpublished studies.

  18. Response of the East Asian climate system to water and heat changes of global frozen soil using NCAR CAM model

    Science.gov (United States)

    Xin, Y.

    2017-12-01

    Under the condition of land-atmosphere heat and water conservation, a set of sensitive numerical experiments are set up to investigate the response of the East Asian climate system to global frozen soil change. This is done by introducing the supercooled soil water process into the Community Land Model (CLM3.0), which has been coupled to the National Center of Atmospheric Research Community Atmosphere Model (CAM3.1). Results show that: 1) The ratio between soil ice and soil water in CLM3.0 is clearly changed by the supercooled soil water process. Ground surface temperature and soil temperature are also affected. 2) The Eurasian (including East Asian) climate system is sensitive to changes of heat and water in frozen soil regions. In January, the Aleutian low sea level pressure circulation is strengthened, Ural blocking high at 500 hPa weakened, and East Asian trough weakened. In July, sea level pressure over the Aleutian Islands region is significantly reduced; there are negative anomalies of 500 hPa geopotential height over the East Asian mainland, and positive anomalies over the East Asian ocean. 3) In January, the southerly component of the 850 hPa wind field over East Asia increases, indicating a weakened winter monsoon. In July, cyclonic anomalies appear on the East Asian mainland while there are anticyclonic anomalies over the ocean, reflective of a strengthened east coast summer monsoon. 4) Summer rainfall in East Asia changed significantly, including substantial precipitation increase on the southern Qinghai-Tibet Plateau, central Yangtze River Basin, and northeast China. Summer rainfall significantly decreased in south China and Hainan Island, but slightly decreased in central and north China. Further analysis showed considerable upper air motion along 30°N latitude, with substantial descent of air at its north and south sides. Warm and humid air from the Northeast Pacific converged with cold air from northern land areas, representing the main cause of

  19. Real-Time Ocean Prediction System for the East Coast of India

    Science.gov (United States)

    Warrior, H. V.

    2016-02-01

    The primary objective of the research work reported in this abstract was to develop a Realtime Environmental model for Ocean Dispersion and Impact (as part of an already in-place Decision Support System) for the purpose of radiological safety for the area along Kalpakkam (East Indian) coast. This system involves combining real-time ocean observations with numerical models of ocean processes to provide hindcasts, nowcasts and forecasts of currents, tides and waves. In this work we present the development of an Automated Coupled Atmospheric - Ocean Model (we call it IIT-CAOM) used to forecast the sea surface currents, sea surface temperature (SST) and salinity etc of the Bay of Bengal region under the influence of transient and unsteady atmospheric conditions. This method uses a coupling of Atmosphere and Ocean model. The models used here are the WRF for atmospheric simulations and POM for the ocean counterpart. It has a 3 km X 3 km resolution. This Coupled Model uses GFS (Global Forecast System) Data or FNL (Final Analyses) Data as initial conditions for jump-starting the atmospheric model. The Atmospheric model is run first thus extracting air temperature, wind speed and relative humidity. The heat flux subroutine computes the net heat flux, using above mentioned parameters data. The net heat flux feeds to the ocean model by simply adding net heat flux subroutine to the ocean model code without changing the model original structure. The online forecast of the IIT-CAOM is currently available in the web. The whole system has been automized and runs without any more manual support. The IIT-CAOM simulations have been carried out for Kalpakkam region, which is located on the East coast of India, about 70 km south of Chennai in Tamilnadu State and a three day forecast of sea surface currents, sea surface temperature (SST) and salinity, etc have been obtained.

  20. Seasonal prediction of East Asian summer rainfall using a multi-model ensemble system

    Science.gov (United States)

    Ahn, Joong-Bae; Lee, Doo-Young; Yoo, Jin‑Ho

    2015-04-01

    Using the retrospective forecasts of seven state-of-the-art coupled models and their multi-model ensemble (MME) for boreal summers, the prediction skills of climate models in the western tropical Pacific (WTP) and East Asian region are assessed. The prediction of summer rainfall anomalies in East Asia is difficult, while the WTP has a strong correlation between model prediction and observation. We focus on developing a new approach to further enhance the seasonal prediction skill for summer rainfall in East Asia and investigate the influence of convective activity in the WTP on East Asian summer rainfall. By analyzing the characteristics of the WTP convection, two distinct patterns associated with El Niño-Southern Oscillation developing and decaying modes are identified. Based on the multiple linear regression method, the East Asia Rainfall Index (EARI) is developed by using the interannual variability of the normalized Maritime continent-WTP Indices (MPIs), as potentially useful predictors for rainfall prediction over East Asia, obtained from the above two main patterns. For East Asian summer rainfall, the EARI has superior performance to the East Asia summer monsoon index or each MPI. Therefore, the regressed rainfall from EARI also shows a strong relationship with the observed East Asian summer rainfall pattern. In addition, we evaluate the prediction skill of the East Asia reconstructed rainfall obtained by hybrid dynamical-statistical approach using the cross-validated EARI from the individual models and their MME. The results show that the rainfalls reconstructed from simulations capture the general features of observed precipitation in East Asia quite well. This study convincingly demonstrates that rainfall prediction skill is considerably improved by using a hybrid dynamical-statistical approach compared to the dynamical forecast alone. Acknowledgements This work was carried out with the support of Rural Development Administration Cooperative Research

  1. Hazard assessment for a pharmaceutical mixture detected in the upper Tennessee River using Daphnia magna

    Directory of Open Access Journals (Sweden)

    D. Wolfe

    2015-01-01

    Full Text Available Widespread use of pharmaceuticals has resulted in mixture concentrations ranging from mg/L in effluent to µg/L concentrations in surface water. In a 2008 study, 13 pharmaceuticals, ranging in amounts from 0.0028 to 0.1757 µg/l, were identified in the Tennessee River, USA and its tributaries. In order to address the need for risk assessment of environmentally relevant pharmaceutical mixtures, Daphnia magna 21-d life cycle tests were performed on a mixture of 11 of the 13 pharmaceuticals as well as on the individual components of the mixture. Mixture exposures were based on the same initial ratios of individual compounds, up to 1000x the initial mixture concentrations.  The endpoints of mortality, time to first brood, size, and fecundity were the assessed.  The LOEC of the 11- pharmaceutical mixture was determined to be 100x greater than the measured mixture concentration detected in the Tennessee River, with the NOEC being 75x that of the measured mixture.  Single concentrations of pharmaceuticals within the mixture up to the 100x LOEC were not statistically different from control for any of the assessed endpoints.  Thus, no single pharmaceutical was deemed predominately responsible for the mixture toxicity at the concentrations tested. While mixtures of pharmaceuticals are common in many systems, based on the findings of the present study, they may not pose a significant acute or chronic hazard to aquatic invertebrates at current concentrations.

  2. Post construction report for Lower East Fork Poplar Creek Project, Phase 1, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    This Phase 1 Remedial Action (RA) effort was conducted in accordance with the Record of Decision (ROD) for Lower East Fork Poplar Creek (LEFPC) as a Comprehensive Environmental Response, Compensation, and Liability Act action. The LEFPC, Phase 1 RA removed approximately 5,560 yd{sup 3} of mercury-contaminated soils, {ge} 400 ppm, from selected portions of the National Oceanographic and Atmospheric Administration (NOAA) site LEFPC floodplain from July 8, 1996--September 14, 1996. During excavation activities, pockets of elevated radiologically contaminated soils (greater than 35 pCi/g) were located by the continuous monitoring of the excavation areas and contaminated soils with radiological monitoring instruments. Through characterization sampling it has been determined that {approximately} 90 yd{sup 3} are less than 35 pCi/g uranium contaminated and will be transported to the Y-12 Landfill V for disposal and the remaining {approximately}40 yd{sup 3} do not meet the WAC for radiological constituents included in the Special Waste Permit for Landfill V. The radiologically contaminated soil will be placed in 21st Century containers for storage at the K-25 site.

  3. An Inventory and Evaluation of Architectural and Engineering Resources of the Big South Fork National River and Recreation Area, Tennessee and Kentucky.

    Science.gov (United States)

    1982-02-25

    coordinated multidisciplinary study of both the architectural and engineering resources of the National Area. Both research b1 orientation and...South Fork just north of Rugby , and traveled through the site where Jamestown, Tennessee, now stands. A third trail, the Chickamauga Path, left the...Thomas Hughes (1881), the founder of the English colony of Rugby , Tennessee, described his neighbors in the Big South Fork area as mostly poor men

  4. Implications and Strategies in Collection Development for Multicultural Education at Tennessee State University.

    Science.gov (United States)

    Kenerson, Murle E.

    This document profiles the role of Tennessee State University's Brown-Daniel Library in its collection development activities for a culturally diverse student body. It recommends that a series of goals and objectives be maintained in the selection criteria of library materials for students having diverse backgrounds. Topics include a brief…

  5. Tennessee Oversight Agreement annual report, May 13, 1993 - May 12, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    This report discusses the activities of the Division of DOE Oversight in the areas of coordination with other State Agencies with regard to environmental restoration, corrective action, and waste management activities on the Oak Ridge Reservation; and the Division's efforts to keep the public informed of those DOE activities that may impact their health and the environment. This report includes the status of the Division's efforts in implementing the Tennessee Oversight Agreement (TOA). Each Program Section provides information concerning the status of its activities. The Administrative Section has been instrumental in achieving access to the ORR without prior notification to DOE and in obtaining documents and environmental, waste management, safety, and health information in a timely manner. The Environmental Restoration Program has provided in-depth document reviews and on-site coordination and monitoring of field activities required under the Federal Facility Agreement. Most notable of the activities are the investigations and planned remediation of the Lower East Fork Poplar Creek and the Watts Bar Reservoir. The Waste Management Program has audited DOE's compliance with air, water, solid, hazardous, and mixed waste storage, treatment, and disposal regulations. Effort was focused on all three DOE Facilities on the ORR. The final portion of this report discusses the Division's findings and recommendations. Most significant of these issues is the Division's request to be an active participant in DOE's prioritization of its TOA commitments. Other issues discussed include long term storage of radioactive waste and the use of environmental restoration funds. A discussion of those findings and recommendations provided in last year's annual report and addressed by DOE are included in this report as well. All documents, logs, files, etc. supporting this report are available for review during routine business hours at the Division's office

  6. Absolute intensity calibration for ECE measurements on EAST

    International Nuclear Information System (INIS)

    Liu Yong; Liu Xiang; Zhao Hailin

    2014-01-01

    In this proceeding, the results of the in-situ absolute intensity calibration for ECE measurements on EAST are presented. A 32-channel heterodyne radiometer system and a Michelson interferometer on EAST have been calibrated independently, and preliminary results from plasma operation indicate a good agreement between the electron temperature profiles obtained with different systems. (author)

  7. Sampling and analysis plan for volatile organic compounds in storm drain for the Upper East Fork Poplar Creek characterization area remedial investigation at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-03-01

    The Oak Ridge Y-12 Plant, located within the Oak Ridge Reservation (ORR), is owned by the US Department of Energy and managed by Lockheed Martin Energy Systems, Inc. The Y-12 Plant is one of three major facilities on the ORR. The ORR contains both hazardous- and mixed-waste sites that are subject to regulations promulgated under the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986. Under RCRA guidelines and requirements from the Tennessee Department of Environment and Conservation, the Y-12 Plant initiated investigation and monitoring of various sites within its boundaries in the mid-1980s. The entire ORR was placed on the National Priorities List of CERCLA sites in November 1989. Following CERCLA guidelines, sites under investigation require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) of potential remedial actions

  8. Baseline and Postremediation Monitoring Program Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This report was prepared in accordance with CERCLA requirements to present the plan for baseline and postremediation monitoring as part of the selected remedy. It provides the Environmental Restoration Program with information about the requirements to monitor for soil and terrestrial biota in the Lower East Fork Poplar Creek (LEFPC) floodplain; sediment, surface water, and aquatic biota in LEFPC; wetland restoration in the LEFPC floodplain; and human use of shallow groundwater wells in the LEFPC floodplain for drinking water. This document describes the monitoring program that will ensure that actions taken under Phases I and II of the LEFPC remedial action are protective of human health and the environment

  9. Construction quality assurance report for the Y-12 Construction/Demolition Landfill VII (CDL VII), Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burton, P.M.

    1994-11-01

    This Construction Quality Assurance (CQA) Report provides documentation that Bid Option 2 of the Y-12 Plant Construction Demolition Landfill 7 (CDL-7) was constructed in substantial compliance with the Tennessee Department of Environment and Conservation (TDEC) approved design, as indicated and specified in the permit drawings, approved changes, and specifications. CDL-7 is located in Anderson County on the south side of Chestnut Ridge, approximately 0.5 miles south of the Y-12 Plant in Oak Ridge, Tennessee. This report applies specifically to the limits of excavation for Area No. 1 portions of the perimeter maintenance road and drainage channel and Sedimentation Pond No. 3. A partial ''As-Built'' survey was performed and is included

  10. Elementary School Psychologists' Perceptions of Response to Intervention and Its Use to Diagnose Students with Specific Learning Disabilities in Tennessee: A Mixed Methods Study

    Science.gov (United States)

    Ebbinger, April M.

    2017-01-01

    The purpose of this study was to examine the changes in initial eligibilities of elementary students across Tennessee since the implementation response to intervention (RtI), as well as understand the perceptions of elementary school psychologists related to those changes in identification and eligibility. RtI is a Tennessee mandated initiative,…

  11. Development of Data Acquisition Card Driver for ICRH System on EAST

    Science.gov (United States)

    Liu, Daming; Luo, Jiarong; Zhao, Yanping; Qin, Chengming

    2008-04-01

    Presented in this paper is the development of the driver for the data acquisition card with a peripheral component interconnection (PCI) local bus on the ion cyclotron range of frequency heating (ICRH) system. The driver is mainly aimed at the embedded VxWorks system (real-time operating system) which is widely used in various fields of real-time systems. An efficient way is employed to develop this driver, which will advance the real-time control of the ICRH system on the experimental advanced superconductor tokamak (EAST). The driver is designed using the TORNADO integrated development environment (IDE), and implemented in C plus language. The details include the hardware configuration, analogue/digital (A/D) and digital/analogue (D/A) conversion, input and output (I/O) operation of the driver to support over five cards. The data acquisition card can be manipulated in a low-level program and meet the requirements of A/D conversion and D/A outputs.

  12. Hydrology of aquifer systems in the Memphis area, Tennessee

    Science.gov (United States)

    Criner, James H.; Sun, P-C. P.; Nyman, Dale J.

    1964-01-01

    The Memphis area as described in .this report comprises about 1,300 square miles of the Mississippi embayment part of the Gulf Coastal Plain. The area is underlain by as much as 3,000 feet of sediments ranging in age from Cretaceous through Quaternary. In 1960, 150 mgd (million gallons per day) of water was pumped from the principal aquifers. Municipal pumpage accounted for almost half of this amount, and industrial pumpage a little more than half. About 90 percent of the water used in the area is derived from the '500-foot' sand, and most of the remainder is from the ?400-foot' sand; both sands are of Eocene age. A small amount of water for domestic use is pumped from the terrace deposits of Pliocene and Pleistocene age. Both the '500-foot' and the '1,400-foot' sands are artesian aquifers except in the southeastern part of the area; there the water level in wells in the '500-foot' sand is now below the overlying confining clay. Water levels in both aquifers have declined almost continuously since pumping began, but the rate of decline has increased rapidly since 1940. Water-level decline in the '1,400-foot' sand has been less pronounced since 1956. The cones of depression in both aquifers have expanded and deepened as a result of the annual increases in pumping, and an increase in hydraulic gradients has induced a greater flow of water into the area. Approximately 135 mgd entered the Memphis area through the '500-foot' sand aquifer in 1960, and, of this amount, 60 mgd originated as inflow from the east and about 75 mgd was derived from leakage from the terrace deposits, from the north, south, and west and from other sources. Of the water entering the '1,400-foot' sand, about 5 mgd was inflow from the east, and about half that amount was from each of the north, south, and west directions. The average rate of movement of water outside the area of heavy withdrawals is about 70 feet per year in the '500-foot' sand and about 40 feet per year in the '1,400-foot' sand

  13. Data report: Illinois, Indiana, Kentucky, Tennessee, and Ohio. National Uranium Resource Evaluation Program. Hydrogeochemical and stream sediment reconnaissance

    International Nuclear Information System (INIS)

    Sargent, K.A.; Cook, J.R.; Fay, W.M.

    1982-02-01

    This report presents the results of ground water, stream water, and stream sediment reconnaissance in Illinois, Indiana, Kentucky, Tennessee, and Ohio. The following sample types were collected in each state: Illinois - 716 stream sediment, 1046 ground water, 337 stream water; Indiana - 126 stream sediment, 443 ground water, 111 stream water; Kentucky - 4901 stream sediment, 6408 ground water, 3966 stream water; Tennessee - 3309 stream sediment, 3574 ground water, 1584 stream water; Ohio - 1214 stream sediment, 2049 ground water, 1205 stream water. Neutron activation analyses are given for U, Br, Cl, F, Mn, Na, Al, V, and Dy in ground water and stream water, and for U, Th, Hf, Ce, Fe, Mn, Na, Sc, Ti, V, Al, Dy, Eu, La, Sm, Yb, and Lu in sediments. Supplementary analyses by other techniques are reported for U (extractable), Ag, As, Ba, Be, Ca, Co, Cr, Cu, K, Li, Mg, Mo, Nb, Ni, P, Pb, Se, Sn, Sr, W, Y, and Zn. These analyses were made on 248 sediment samples from Tennessee. Field measurements and observations are reported for each site. Oak Ridge National Laboratory analyzed sediment samples which were not analyzed by Savannah River Laboratory neutron activation

  14. Walker Branch Throughfall Displacement Experiment Data Report: Site Characterization, System Performance, Weather, Species Composition, and Growth

    Energy Technology Data Exchange (ETDEWEB)

    Hanson, P.J.

    2001-09-04

    This numeric data package provides data sets, and accompanying documentation, on site characterization, system performance, weather, species composition, and growth for the Throughfall Displacement Experiment, which was established in the Walker Branch Watershed of East Tennessee to provide data on the responses of forests to altered precipitation regimes. The specific data sets include soil water content and potential, coarse fraction of the soil profile, litter layer temperature, soil temperature, monthly weather, daily weather, hourly weather, species composition of trees and saplings, mature tree and sapling annual growth, and relative leaf area index. Fortran and SAS{trademark} access codes are provided to read the ASCII data files. The data files and this documentation are available without charge on a variety of media and via the Internet from the Carbon Dioxide Information Analysis Center (CDIAC).

  15. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This remedial investigation (RI)/feasibility study (FS) supports the selection of remedial actions for the David Witherspoon, Inc. 901 Maryville Pike Site in Knoxville, Tennessee. Operations at the site, used as a recycling center, have resulted in past, present, and potential future releases of hazardous substances in to the environment. This Site is a Tennessee Superfund site. A phased approach was planned to (1) gather existing data from previous investigations managed by the Tenn. Dept. of Environment and Conservation; (2) perform a preliminary RI, including risk assessments, and an FS with existing data to identify areas where remedial action may be necessary; (3) gather additional field data to adequately define the nature and extent of risk-based contaminants that present identifiable threats to human and/or ecological receptors; and (4) develop remedial action alternatives to reduce risks to acceptable levels.

  16. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 1

    International Nuclear Information System (INIS)

    1996-10-01

    This remedial investigation (RI)/feasibility study (FS) supports the selection of remedial actions for the David Witherspoon, Inc. 901 Maryville Pike Site in Knoxville, Tennessee. Operations at the site, used as a recycling center, have resulted in past, present, and potential future releases of hazardous substances in to the environment. This Site is a Tennessee Superfund site. A phased approach was planned to (1) gather existing data from previous investigations managed by the Tenn. Dept. of Environment and Conservation; (2) perform a preliminary RI, including risk assessments, and an FS with existing data to identify areas where remedial action may be necessary; (3) gather additional field data to adequately define the nature and extent of risk-based contaminants that present identifiable threats to human and/or ecological receptors; and (4) develop remedial action alternatives to reduce risks to acceptable levels

  17. 77 FR 74820 - Approval and Promulgation of Implementation Plans; Tennessee: Knox County Supplemental Motor...

    Science.gov (United States)

    2012-12-18

    ... Regional Office's normal hours of operation. The Regional Office's official hours of business are Monday... maintenance plan to increase the safety margin as a result of new emissions model, VMT projection models, and... Promulgation of Implementation Plans; Tennessee: Knox County Supplemental Motor Vehicle Emissions Budget Update...

  18. Efficiency disparities among community hospitals in Tennessee: do size, location, ownership, and network matter?

    Science.gov (United States)

    Roh, Chul-Young; Moon, M Jae; Jung, Kwangho

    2013-11-01

    This study examined the impact of ownership, size, location, and network on the relative technical efficiency of community hospitals in Tennessee for the 2002-2006 period, by applying data envelopment analysis (DEA) to measure technical efficiency (decomposed into scale efficiency and pure technical efficiency). Data envelopment analysis results indicate that medium-size hospitals (126-250 beds) are more efficient than their counterparts. Interestingly, public hospitals are significantly more efficient than private and nonprofit hospitals in Tennessee, and rural hospitals are more efficient than urban hospitals. This is the first study to investigate whether hospital networks with other health care providers affect hospital efficiency. Results indicate that community hospitals with networks are more efficient than non-network hospitals. From a management and policy perspective, this study suggests that public policies should induce hospitals to downsize or upsize into optional size, and private hospitals and nonprofit hospitals should change their organizational objectives from profit-driven to quality-driven.

  19. 78 FR 44886 - Approval and Promulgation of Implementation Plans; Tennessee: New Source Review-Prevention of...

    Science.gov (United States)

    2013-07-25

    ... ): Amendment to the Definition of `Regulated NSR Pollutant' Concerning Condensable Particulate Matter, Final... the term ``particulate matter emissions'' from Tennessee's state law definition of ``regulated NSR... that included the term ``particulate matter emissions'' in the definition of ``regulated NSR pollutant...

  20. Congenital malformation and fetal mortality trends in counties surrounding Oak Ridge

    International Nuclear Information System (INIS)

    Shank, K.E.; Easterly, C.D.; Oakes, T.W.

    1979-12-01

    Stillbirth and congenital malformation death data have been evaluated for counties surrounding the Oak Ridge nuclear facilities. The observed values were compared with expected values, based on state of Tennessee and East Tennessee rates, for three time periods: prior to the existence of the nuclear facilities; the early years of operation; and the later years of operation. Oak Ridge, which is the closest city to the nuclear facilities, had significantly fewer stillbirths and no difference in congenital malformations as compared with the state or East Tennessee. No time trend was observed in the 8-county data which could be associated with the higher levels of radioactive releases during the 1944 to 1957 period followed by a period of lesser releases in the 1958 to 1971 period. However, a clustering of stillbirths was found for the last time period. In the study, no significant relationship was found between the occurrence of stillbirths and congenital malformation deaths

  1. Medical screening after a coal fly ash spill in Roane County, Tennessee.

    Science.gov (United States)

    Nichols, Gregory P; Cragle, Donna L; Benitez, John G

    2014-08-01

    To assess the health of community residents following a coal fly ash spill at the Tennessee Valley Authority Kingston Fossil Plant in Harriman, Tennessee, on December 22, 2008. A uniform health assessment was developed by epidemiologists at Oak Ridge Associated Universities and medical toxicologists at Vanderbilt University Medical Center. Residents who believed that their health may have been affected by the coal fly ash spill were invited to participate in the medical screening program. Among the 214 individuals who participated in the screening program, the most commonly reported symptoms were related to upper airway irritation. No evidence of heavy metal toxicity was found. This is the first report, to our knowledge, regarding the comprehensive health evaluation of a community after a coal fly ash spill. Because this evaluation was voluntary, the majority of residents screened represented those with a high percentage of symptoms and concerns about the potential for toxic exposure. Based on known toxicity of the constituents present in the coal fly ash, health complaints did not appear to be related to the fly ash. This screening model could be used to assess immediate or baseline toxicity concerns after other disasters.

  2. Cardiovascular risk in minority and underserved women in Appalachian Tennessee: a descriptive study.

    Science.gov (United States)

    Pearson, Tamera Lea

    2010-04-01

    The purposes of this study were to translate current knowledge regarding cardiovascular risk factors, screening, and prevention to a disparate population of women and to ascertain the cardiovascular health status and risk factors in a sample of minority and underserved Appalachian women. Demographic data were collected from a voluntary sample of women from a disparate population living in Appalachian Tennessee. A coronary risk profile recorded family health history, personal health history, and lifestyle habits affecting risk for cardiovascular disease. Physiologic measurements included body mass index, blood pressure, fasting glucose, cholesterol levels, ankle brachial index, and carotid artery stenosis. Women in Appalachia Tennessee from a disparate population have high risks for heart disease and stroke. This is a critical time to address any modifiable risk factors and aggressively treat underlying cardiovascular diseases such as hypertension and hypercholesterolemia. Nurse practitioners (NPs) often provide primary care to women who may not be aware of their cardiovascular risks or actual disease. NPs can ensure that their practice incorporates primary and secondary cardiovascular prevention through screening, individual health education, and aggressive evidence-based treatment plans for women.

  3. Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956)- An Assessment of Quantities released, Off-Site Radiation Doses, and Potential Excess Risks of Thyroid Cancer, Volume 1

    International Nuclear Information System (INIS)

    Apostoaei, A.I.; Burns, R.E.; Hoffman, F.O.; Ijaz, T.; Lewis, C.J.; Nair, S.K.; Widner, T.E.

    1999-01-01

    In the early 1990s, concern about the Oak Ridge Reservation's past releases of contaminants to the environment prompted Tennessee's public health officials to pursue an in-depth study of potential off-site health effects at Oak Ridge. This study, the Oak Ridge dose reconstruction, was supported by an agreement between the U.S. Department of Energy (DOE) and the State of Tennessee, and was overseen by a 12-member panel appointed by Tennessee's Commissioner of Health. One of the major contaminants studied in the dose reconstruction was radioactive iodine, which was released to the air by X-10 (now called Oak Ridge National Laboratory) as it processed spent nuclear reactor fuel from 1944 through 1956. The process recovered radioactive lanthanum for use in weapons development. Iodine concentrates in the thyroid gland so health concerns include various diseases of the thyroid, such as thyroid cancer. The large report, ''Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956) - An Assessment of Quantities Released, Off-site Radiation Doses, and Potential Excess Risks of Thyroid Cancer,'' is in two volumes. Volume 1 is the main body of the report, and Volume 1A, which has the same title, consists of 22 supporting appendices. Together, these reports serve the following purposes: (1) describe the methodologies used to estimate the amount of iodine-131 (I-131) released; (2) evaluate I-131's pathway from air to vegetation to food to humans; (3) estimate doses received by human thyroids; (4) estimate excess risk of acquiring a thyroid cancer during ones lifetime; and (5) provide equations, examples of historical documents used, and tables of calculated values. Results indicate that females born in 1952 who consumed milk from a goat pastured a few miles east of X-10 received the highest doses from I-131 and would have had the highest risks of contracting thyroid cancer. Doses from cow's milk are considerably less . Detailed

  4. Tennessee Offender Management Information System

    OpenAIRE

    Beck, Tim

    1993-01-01

    This article describes the integration of a knowledge-based system with a large COBOL-DB2-based offender management system. The knowledge-based application, developed for the purpose of offender sentence calculation, is shown to provide several benefits, including a shortened development cycle, simplified maintenance, and improved accuracy over a previous COBOL-based application.

  5. 78 FR 29032 - Approval and Promulgation of Implementation Plans Tennessee: Revisions to Volatile Organic...

    Science.gov (United States)

    2013-05-17

    ... of the term ``particulate matter emissions'' at 1200-03-09-.01(4)(b)47 (vi) as part of the definition... Promulgation of Implementation Plans Tennessee: Revisions to Volatile Organic Compound Definition AGENCY..., 1999, SIP adds 17 compounds to the list of compounds excluded from the definition of ``Volatile Organic...

  6. Development and Implementation of the Collaboratory on EAST

    International Nuclear Information System (INIS)

    Zhang Mingxin; Luo Jiarong; Li Guiming; Wang Hua; Cheng Ting

    2006-01-01

    The collaboratory for the EAST is available, which possesses the capacity to further advance active research on EAST. In doing so, the distance between local researchers and participators over the world is just a click away. To feature the system with the function of remote control, the functional business logic is all encapsulated in the mandatory controls, which can potentially boost the computing capability of the clients with a B/S framework. At the same time, the EAST collaboratory embraces powerful on-line data exchange and data management functions via state-of-the-art XML Web services. With the goal of accessing and analysing the pivotal experimental data on-line, a data analysis system is implemented in JAVA. Finally as a valuable asset of the EAST collaboratory the function of videoconference will be also covered in this contribution

  7. Relationships of cognitive and metacognitive learning strategies to mathematics achievement in four high-performing East Asian education systems.

    Science.gov (United States)

    Areepattamannil, Shaljan; Caleon, Imelda S

    2013-01-01

    The authors examined the relationships of cognitive (i.e., memorization and elaboration) and metacognitive learning strategies (i.e., control strategies) to mathematics achievement among 15-year-old students in 4 high-performing East Asian education systems: Shanghai-China, Hong Kong-China, Korea, and Singapore. In all 4 East Asian education systems, memorization strategies were negatively associated with mathematics achievement, whereas control strategies were positively associated with mathematics achievement. However, the association between elaboration strategies and mathematics achievement was a mixed bag. In Shanghai-China and Korea, elaboration strategies were not associated with mathematics achievement. In Hong Kong-China and Singapore, on the other hand, elaboration strategies were negatively associated with mathematics achievement. Implications of these findings are briefly discussed.

  8. Assessment of Appalachian basin oil and gas resources: Carboniferous Coal-bed Gas Total Petroleum System: Chapter G.1 in Coal and petroleum resources in the Appalachian basin: distribution, geologic framework, and geochemical character

    Science.gov (United States)

    Milici, Robert C.; Ruppert, Leslie F.; Ryder, Robert T.

    2014-01-01

    The Carboniferous Coal-bed Gas Total Petroleum System, which lies within the central and southern Appalachian basin, consists of the following five assessment units (AUs): (1) the Pocahontas Basin AU in southern West Virginia, eastern Kentucky, and southwestern Virginia; (2) the Central Appalachian Shelf AU in Tennessee, eastern Kentucky, and southern West Virginia; (3) the East Dunkard (Folded) AU in western Pennsylvania and northern West Virginia; (4) the West Dunkard (Unfolded) AU in Ohio and adjacent parts of Pennsylvania and West Virginia; and (5) the Appalachian Anthracite and Semi-Anthracite AU in Pennsylvania and Virginia. Only two of these assessment units were assessed quantitatively by the U.S. Geological Survey (USGS) in the National Oil and Gas Assessment in 2002. The USGS estimated the Pocahontas Basin AU and the East Dunkard (Folded) AU to contain a mean of about 3.6 and 4.8 trillion cubic feet (TCF) of undiscovered, technically recoverable gas, respectively.

  9. 77 FR 44481 - Approval and Promulgation of Implementation Plans; Tennessee: Prevention of Significant...

    Science.gov (United States)

    2012-07-30

    ..., in light of Tennessee request in its May 1, 2012, letter and EPA's intention to amend the definition...'' Provision In the NSR PM 2.5 Rule, EPA revised the definition of ``regulated NSR pollutant'' for PSD to add a... definition of ``regulated NSR pollutant'' promulgated in the NSR PM 2.5 Rule regarding the PM condensable...

  10. Preliminary assessment report for Grubbs/Kyle Training Center, Smyrna/Rutherford County Regional Airport, Installation 47340, Smyrna, Tennessee

    International Nuclear Information System (INIS)

    Dennis, C.; Stefano, J.

    1993-07-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Tennessee Army National Guard (TNARNG) property near Smyrna, Tennessee. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Grubbs/Kyle Training Center property, the requirement of the Department of Defense Installation Restoration Program

  11. Waste Management Plan for the Lower East Fork Poplar Creek Remedial Action Project Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Landfill V, and restore the affected floodplain upon completion of remediation activities. This effort will be conducted in accordance with the Record of Decision (ROD) for LEFPC as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) action. The Waste Management Plan addresses management and disposition of all wastes generated during the remedial action for the LEFPC Project Most of the solid wastes will be considered to be sanitary or construction/demolition wastes and will be disposed of at existing Y-12 facilities for those types of waste. Some small amounts of hazardous waste are anticipated, and the possibility of low- level or mixed waste exists (greater than 35 pCi/g), although these are not expected. Liquid wastes will be generated which will be sanitary in nature and which will be capable of being disposed 0214 of at the Oak Ridge Sewage Treatment Plant.

  12. Waste Management Plan for the Lower East Fork Poplar Creek Remedial Action Project Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-08-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Landfill V, and restore the affected floodplain upon completion of remediation activities. This effort will be conducted in accordance with the Record of Decision (ROD) for LEFPC as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) action. The Waste Management Plan addresses management and disposition of all wastes generated during the remedial action for the LEFPC Project Most of the solid wastes will be considered to be sanitary or construction/demolition wastes and will be disposed of at existing Y-12 facilities for those types of waste. Some small amounts of hazardous waste are anticipated, and the possibility of low- level or mixed waste exists (greater than 35 pCi/g), although these are not expected. Liquid wastes will be generated which will be sanitary in nature and which will be capable of being disposed 0214 of at the Oak Ridge Sewage Treatment Plant

  13. Distributed Cognition on the road: Using EAST to explore future road transportation systems.

    Science.gov (United States)

    Banks, Victoria A; Stanton, Neville A; Burnett, Gary; Hermawati, Setia

    2018-04-01

    Connected and Autonomous Vehicles (CAV) are set to revolutionise the way in which we use our transportation system. However, we do not fully understand how the integration of wireless and autonomous technology into the road transportation network affects overall network dynamism. This paper uses the theoretical principles underlying Distributed Cognition to explore the dependencies and interdependencies that exist between system agents located within the road environment, traffic management centres and other external agencies in both non-connected and connected transportation systems. This represents a significant step forward in modelling complex sociotechnical systems as it shows that the principles underlying Distributed Cognition can be applied to macro-level systems using the visual representations afforded by the Event Analysis of Systemic Teamwork (EAST) method. Copyright © 2017 Elsevier Ltd. All rights reserved.

  14. Groundwater quality assessment for the Upper East Fork Poplar Creek Hydrogeologic Regime at the Y-12 Plant: Data interpretations and proposed program modifications

    International Nuclear Information System (INIS)

    1991-06-01

    This report is a detailed assessment of groundwater quality at several hazardous waste-management facilities associated with the Department of Energy (DOE) Y-12 Plant in Oak Ridge, Tennessee. The sites are located in an area defined as the Upper East Fork Poplar Creek Hydrogeologic Regime (UEFPCHR), which is one of three hydrogeologic regimes that have been established at the Y-12 Plant in an effort to unify and coordinate site-specific monitoring activities for planning and reporting purposes. Section 2.0 contains background information and a discussion of the 1990 program objectives. An overview of the complex hydrogeologic system in the UEFPCHR is provided in Section 3.0. A discussion of the interpretive assumptions used in evaluating the 1990 assessment data, a review of groundwater geochemistry and background water quality, detailed descriptions of groundwater contaminant plumes, and a discussion regarding the quality of groundwater exiting the UEFPCHR are presented in Section 4.0. Findings of the 1990 assessment program are summarized in Section 5.0. Modifications to the assessment monitoring program proposed for 1991 are presented in Section 6.0, and a list of references (Section 7.0) concludes the report. 20 refs., 23 figs., 10 tabs

  15. Characterization of sediments in the Clinch River, Tennessee, using remote sensing and multi-dimensional GIS techniques

    International Nuclear Information System (INIS)

    Levine, D.A.; Hargrove, W.W.; Hoffman, F.

    1995-01-01

    Remotely-sensed hydro-acoustic data were used as input to spatial extrapolation tools in a GIS to develop two- and three-dimensional models of sediment densities in the Clinch River arm of Watts Bar Reservoir, Tennessee. This work delineated sediment deposition zones to streamline sediment sampling and to provide a tool for estimating sediment volumes and extrapolating contaminant concentrations throughout the system. The Clinch River arm of Watts Bar Reservoir has been accumulating sediment-bound contaminants from three Department of Energy (DOE) facilities on the Oak Ridge Reservation, Tennessee. Public concern regarding human and ecological health resulted in Watts Bar Reservoir being placed on the National Priorities List for SUPERFUND. As a result, DOE initiated and is funding the Clinch River Environmental Restoration Program (CR-ERP) to perform a remedial investigation to determine the nature and extent of sediment contamination in the Watts Bar Reservoir and the Clinch River and to quantify any human or ecological health risks. The first step in characterizing Clinch River sediments was to determine the locations of deposition zones. It was also important to know the sediment type distribution within deposition zones because most sediment-bound contaminants are preferentially associated to fine particles. A dual-frequency hydro-acoustic survey was performed to determine: (1) depth to the sediment water interface, (2) depth of the sediment layer, and (3) sediment characteristics (density) with depth (approximately 0.5-foot intervals). An array of geophysical instruments was used to meet the objectives of this investigation

  16. A new tool for virtual scientific and autostereoscopic visualization of EAST

    International Nuclear Information System (INIS)

    Li, Dan; Xiao, B.J.; Xia, J.Y.; Wang, K.R.; Chen, S.L.; Luo, W.L.

    2016-01-01

    Highlights: • 3D effect of the virtual EAST has been improved and data visualization has been realized in the ASEAST system. • Interaction behavior is created that the users can get information from database. • The system integrates data acquisition, data visualization and model visualization. • QT libraries are adopted to realize the cross-platform and impressive graphical interface. • In order to manage the models, the web-based model manager system is constructed. - Abstract: The Experimental Advanced Superconducting Tokamak (EAST) Device began operation in 2006. EAST visualization work has been paid more and more attention for simulating its running state and inner structure. The VEAST system had been developed to display the 3D model of EAST facility and some diagnostic data based on Java3D. Compared with the VEAST system, a new system named autosterescopic scientific EAST (ASEAST) using C/S (Client/Server) structure in combination with the technology of OpenGL and an open-source software system for 3D computer graphics and visualization called VTK (Visualization Toolkit) and the Qt5 libraries for the graphical user interface (GUI) has been developed to improve the 3D effect of the virtual EAST and visualize the experimental data. The ASEAST can be used to get access to the information of EAST and physical properties. In addition, as a general system, ASEAST supports a wide variety of 3D formats. The visualization result can be output in the corresponding format of the input. In order to improve the rendering speed, we used the classic QEM algorithm to simplify the models in preprocess stage. As for the 3D effect, we made an investigation and the survey revealed that the system had good 3D effect.

  17. A new tool for virtual scientific and autostereoscopic visualization of EAST

    Energy Technology Data Exchange (ETDEWEB)

    Li, Dan, E-mail: lidan@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Xiao, B.J.; Xia, J.Y.; Wang, K.R. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); University of Science and Technology of China, Hefei, Anhui (China); Chen, S.L. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Luo, W.L. [709th Research lnstitute, China Shipbuilding lndustry Corporation, Wuhan, Hubei (China)

    2016-11-15

    Highlights: • 3D effect of the virtual EAST has been improved and data visualization has been realized in the ASEAST system. • Interaction behavior is created that the users can get information from database. • The system integrates data acquisition, data visualization and model visualization. • QT libraries are adopted to realize the cross-platform and impressive graphical interface. • In order to manage the models, the web-based model manager system is constructed. - Abstract: The Experimental Advanced Superconducting Tokamak (EAST) Device began operation in 2006. EAST visualization work has been paid more and more attention for simulating its running state and inner structure. The VEAST system had been developed to display the 3D model of EAST facility and some diagnostic data based on Java3D. Compared with the VEAST system, a new system named autosterescopic scientific EAST (ASEAST) using C/S (Client/Server) structure in combination with the technology of OpenGL and an open-source software system for 3D computer graphics and visualization called VTK (Visualization Toolkit) and the Qt5 libraries for the graphical user interface (GUI) has been developed to improve the 3D effect of the virtual EAST and visualize the experimental data. The ASEAST can be used to get access to the information of EAST and physical properties. In addition, as a general system, ASEAST supports a wide variety of 3D formats. The visualization result can be output in the corresponding format of the input. In order to improve the rendering speed, we used the classic QEM algorithm to simplify the models in preprocess stage. As for the 3D effect, we made an investigation and the survey revealed that the system had good 3D effect.

  18. University of Tennessee deploys force10 C-series to analyze data from CERN's Large Hadron Collider

    CERN Multimedia

    2007-01-01

    "Force20 networks, the pioneer in building and securing reliable networks, today announced that the University of Tennessee physics department has deployed the C300 resilient switch to analyze data form CERN's Large Hadron Collider." (1 page)

  19. Field Sampling and Analysis Plan for the Remedial Investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-10-01

    This report provides responses to US Environmental Protection Agency Region IV EPA-M and Tennessee Department of Environment and Conservation Oversite Division (TDEC-O) comments on report ORNL/ER-58, Field Sampling and Analysis Plan for the Remedial Investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Waste Area Grouping (WAG) 2 consists of the White Oak Creek (WOC) drainage system downgradient of the major ORNL WAGs in the WOC watershed. A strategy for the remedial investigation (RI) of WAG2 was developed in report ES/ER-14 ampersand Dl, Remedial Investigation Plan for Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. This strategy takes full advantage of WAG2's role as an integrator of contaminant releases from the ORNL WAGs in the WOC watershed, and takes full advantage of WAG2's role as a conduit for contaminants from the ORNL site to the Clinch River. The strategy calls for a multimedia environmental monitoring and characterization program to be conducted in WAG2 while upgradient contaminant sources are being remediated. This monitoring and characterization program will (1) identify and quantify contaminant fluxes, (2) identify pathways of greatest concern for human health and environmental risk, (3) improve conceptual models of contaminant movement, (4) support the evaluation of remedial alternatives, (5) support efforts to prioritize sites for remediation, (6) document the reduction in contaminant fluxes following remediation, and (7) support the eventual remediation of WAG2. Following this strategy, WAG2 has been termed an ''integrator WAG,'' and efforts in WAG2 over the short term are directed toward supporting efforts to remediate the contaminant ''source WAGS'' at ORNL

  20. Analysis of Potential Benefits and Costs of Adopting ASHRAE Standard 90.1-2001 as the Commercial Building Energy Code in Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Cort, Katherine A.; Winiarski, David W.; Belzer, David B.; Richman, Eric E.

    2004-09-30

    ASHRAE Standard 90.1-2001 Energy Standard for Buildings except Low-Rise Residential Buildings (hereafter referred to as ASHRAE 90.1-2001 or 90.1-2001) was developed in an effort to set minimum requirements for the energy efficient design and construction of new commercial buildings. The State of Tennessee is considering adopting ASHRAE 90.1-2001 as its commercial building energy code. In an effort to evaluate whether or not this is an appropriate code for the state, the potential benefits and costs of adopting this standard are considered in this report. Both qualitative and quantitative benefits and costs are assessed. Energy and economic impacts are estimated using the Building Loads Analysis and System Thermodynamics (BLAST) simulations combined with a Life-Cycle Cost (LCC) approach to assess corresponding economic costs and benefits. Tennessee currently has ASHRAE Standard 90A-1980 as the statewide voluntary/recommended commercial energy standard; however, it is up to the local jurisdiction to adopt this code. Because 90A-1980 is the recommended standard, many of the requirements of ASHRAE 90A-1980 were used as a baseline for simulations.

  1. Zero carbon energy system of South East Europe in 2050

    International Nuclear Information System (INIS)

    Dominković, D.F.; Bačeković, I.; Ćosić, B.; Krajačić, G.; Pukšec, T.; Duić, N.; Markovska, N.

    2016-01-01

    Highlights: • 100% renewable energy system of the South East Europe has been achieved. • Sector integration makes the zero carbon system cheaper compared to the base year. • Numerous renewable technologies needed to achieve zero carbon in the year 2050. • Energy efficiency is a crucial part in a transition to the zero carbon energy system. • No technology has a larger share than 30%; increased security of energy supply. - Abstract: South East Europe is the region in a part of Europe with approximately 65.5 million inhabitants, making up 8.9% of Europe’s total population. The countries concerned have distinct geographical features, various climates and significant differences in gross domestic product per capita, so the integration of their energy systems is considered to be a challenging task. Large differences between energy mixes, still largely dominated by fossil-fuel consumption, make this task even more demanding. This paper presents the transition steps to a 100% renewable energy system which need to be carried out until the year 2050 in order to achieve zero carbon energy society. Novelty of this paper compared to other papers with similar research goals is the assumed sustainable use of biomass in the 100% renewable energy system of the region considered. It is important to emphasize here that only the sustainable use of biomass can be considered carbon-neutral. The resulting biomass consumption of the model was 725.94 PJ for the entire region, which is in line with the biomass potential of the region. Modelling the zero-carbon energy system was carried out using the smart energy system concept, together with its main integration pillars, i.e. power-to-heat and power-to-gas technologies. The resulting power generation mix shows that a wide variety of energy sources need to be utilized and no single energy source has more than a 30% share, which also increases the security of supply. Wind turbines and photovoltaics are the main technologies with

  2. Recent progress with ICRF heating on EAST

    International Nuclear Information System (INIS)

    Zhang Xinjun; Zhao, Y.P.; Mao, Y.Z.

    2014-01-01

    Radio Frequency (RF) power in the ion cyclotron range of frequencies (ICRF) is one of the primary auxiliary heating techniques for Experimental Advanced Superconducting Tokamak (EAST). The ICRF system for the EAST has been developed to support long-pulse, high-β, advanced tokamak fusion physics experiments. The ICRF system can deliver 12 MW of RF power to the plasma for 1000 seconds through two antennas located in B- and I-ports. Each ICRF transmitter with high power up to 1.5 MW has been successfully tested on a dummy load. The main technical features of the ICRF system is described. Two simulation codes, TORIC (a full wave solver) and SSFPQL (the quasilinear Fokker-Planck solver), are combined to simulate the ICRF heating in the EAST 2D magnetic configuration. The fast wave propagation and absorption characteristics, power partitions among the plasma species and the RF driven energetic tails have been analyzed. (author)

  3. East Asian Studies of Tropospheric Aerosols and their Impact on Regional Climate (EAST -AIRC): An overview

    Science.gov (United States)

    Zhangqing, Li; Li, C.; Chen, H.; Tsay, S.-C.; Holben, B.; Huang, J.; Li, B.; Maring, H.; Qian, Y.; Shi, G.; hide

    2011-01-01

    As the most populated region of the world, Asia is a major source of aerosols with potential large impact over vast downstream areas, Papers published in this special section describe the variety of aerosols observed in China and their effects and interactions with the regional climate as part of the East Asian Study of Tropospheric Aerosols and their Impact on Regional Climate (EAST-AIRC), The majority of the papers are based on analyses of observations made under three field projects, namely, the Atmospheric Radiation Measurements (ARM) Mobile Facility mission in China (AMF-China), the East Asian Study of Tropospheric Aerosols: An International Regional Experiment (EAST-AIRE), and the Atmospheric Aerosols of China and their Climate Effects (AACCE), The former two are U,S,-China collaborative projects, and the latter is a part of the China's National Basic Research program (or often referred to as "973 project"), Routine meteorological data of China are also employed in some studies, The wealth of general and speCIalized measurements lead to extensive and close-up investigations of the optical, physical, and chemical properties of anthropogenic, natural, and mixed aerosols; their sources, formation, and transport mechanisms; horizontal, vertical, and temporal variations; direct and indirect effects; and interactions with the East Asian monsoon system, Particular efforts are made to advance our understanding of the mixing and interaction between dust and anthropogenic pollutants during transport. Several modeling studies were carried out to simulate aerosol impact on radiation budget, temperature, precipitation, wind and atmospheric circulation, fog, etc, In addition, impacts of the Asian monsoon system on aerosol loading are also simulated.

  4. East Asian winter monsoon forecasting schemes based on the NCEP's climate forecast system

    Science.gov (United States)

    Tian, Baoqiang; Fan, Ke; Yang, Hongqing

    2017-12-01

    The East Asian winter monsoon (EAWM) is the major climate system in the Northern Hemisphere during boreal winter. In this study, we developed two schemes to improve the forecasting skill of the interannual variability of the EAWM index (EAWMI) using the interannual increment prediction method, also known as the DY method. First, we found that version 2 of the NCEP's Climate Forecast System (CFSv2) showed higher skill in predicting the EAWMI in DY form than not. So, based on the advantage of the DY method, Scheme-I was obtained by adding the EAWMI DY predicted by CFSv2 to the observed EAWMI in the previous year. This scheme showed higher forecasting skill than CFSv2. Specifically, during 1983-2016, the temporal correlation coefficient between the Scheme-I-predicted and observed EAWMI was 0.47, exceeding the 99% significance level, with the root-mean-square error (RMSE) decreased by 12%. The autumn Arctic sea ice and North Pacific sea surface temperature (SST) are two important external forcing factors for the interannual variability of the EAWM. Therefore, a second (hybrid) prediction scheme, Scheme-II, was also developed. This scheme not only involved the EAWMI DY of CFSv2, but also the sea-ice concentration (SIC) observed the previous autumn in the Laptev and East Siberian seas and the temporal coefficients of the third mode of the North Pacific SST in DY form. We found that a negative SIC anomaly in the preceding autumn over the Laptev and the East Siberian seas could lead to a significant enhancement of the Aleutian low and East Asian westerly jet in the following winter. However, the intensity of the winter Siberian high was mainly affected by the third mode of the North Pacific autumn SST. Scheme-I and Scheme-II also showed higher predictive ability for the EAWMI in negative anomaly years compared to CFSv2. More importantly, the improvement in the prediction skill of the EAWMI by the new schemes, especially for Scheme-II, could enhance the forecasting skill of

  5. Annotated Administrative Record Site-Specific Document Index, American Drum & Pallet Co. Removal Site, Memphis, Shelby County, Tennessee

    Science.gov (United States)

    Contains annotated index of site specific documents for the American Drum & Pallet Co. Removal Site in Memphis, Shelby County, Tennessee, January 9, 2008 Region ID: 04 DocID: 10517016, DocDate: 01-09-2008

  6. The Implementation of Computer Data Processing Software for EAST NBI

    International Nuclear Information System (INIS)

    Zhang Xiaodan; Hu Chundong; Sheng Peng; Zhao Yuanzhe; Wu Deyun; Cui Qinglong

    2014-01-01

    One of the most important project missions of neutral beam injectors is the implementation of 100 s neutral beam injection (NBI) with high power energy to the plasma of the EAST superconducting tokamak. Correspondingly, it's necessary to construct a high-speed and reliable computer data processing system for processing experimental data, such as data acquisition, data compression and storage, data decompression and query, as well as data analysis. The implementation of computer data processing application software (CDPS) for EAST NBI is presented in this paper in terms of its functional structure and system realization. The set of software is programmed in C language and runs on Linux operating system based on TCP network protocol and multi-threading technology. The hardware mainly includes industrial control computer (IPC), data server, PXI DAQ cards and so on. Now this software has been applied to EAST NBI system, and experimental results show that the CDPS can serve EAST NBI very well. (fusion engineering)

  7. E-Waste Recycling Systems and Sound Circulative Economies in East Asia: A Comparative Analysis of Systems in Japan, South Korea, China and Taiwan

    Directory of Open Access Journals (Sweden)

    Soo-cheol Lee

    2010-06-01

    Full Text Available The main purpose of this paper is to review and compare E-waste management systems operating in East Asian countries in efforts to identify future challenges facing the circulative economies in the region. The first topic of this paper is cost sharing (physical and financial as applied to the various stakeholders, including producers, consumers, local governments and recyclers, in the E-waste management systems. The second topic is the environmental and economical impacts of these E-waste management systems on recycling technology, trans-boundary movement of E-wastes and Design for Environment (DfE. The final topic is the possibility for international cooperation in the region in terms of E-waste management systems. The authors’ preliminary result is that the E-waste management systems operating in these East Asian countries have contributed to extended producer responsibility and DfE to some extent, but many challenges remain in their improvement through proper cost sharing among the stakeholders. It is also clear that the cross-border transfer of E-wastes cannot be resolved by one nation alone, and thus international cooperation will be indispensable in finding a suitable solution.

  8. Structural evolution of the east Sierra Valley system (Owens Valley and vicinity), California: a geologic and geophysical synthesis

    Science.gov (United States)

    Stevens, Calvin H.; Stone, Paul; Blakely, Richard J.

    2013-01-01

    The tectonically active East Sierra Valley System (ESVS), which comprises the westernmost part of the Walker Lane-Eastern California Shear Zone, marks the boundary between the highly extended Basin and Range Province and the largely coherent Sierra Nevada-Great Valley microplate (SN-GVm), which is moving relatively NW. The recent history of the ESVS is characterized by oblique extension partitioned between NNW-striking normal and strike-slip faults oriented at an angle to the more northwesterly relative motion of the SN-GVm. Spatially variable extension and right-lateral shear have resulted in a longitudinally segmented valley system composed of diverse geomorphic and structural elements, including a discontinuous series of deep basins detected through analysis of isostatic gravity anomalies. Extension in the ESVS probably began in the middle Miocene in response to initial westward movement of the SN-GVm relative to the Colorado Plateau. At ca. 3-3.5 Ma, the SN-GVm became structurally separated from blocks directly to the east, resulting in significant basin-forming deformation in the ESVS. We propose a structural model that links high-angle normal faulting in the ESVS with coeval low-angle detachment faulting in adjacent areas to the east.

  9. Impact of Medicaid disenrollment in Tennessee on breast cancer stage at diagnosis and treatment.

    Science.gov (United States)

    Tarazi, Wafa W; Bradley, Cathy J; Bear, Harry D; Harless, David W; Sabik, Lindsay M

    2017-09-01

    States routinely may consider rollbacks of Medicaid expansions to address statewide economic conditions. To the authors' knowledge, little is known regarding the effects of public insurance contractions on health outcomes. The current study examined the effects of the 2005 Medicaid disenrollment in Tennessee on breast cancer stage at the time of diagnosis and delays in treatment among nonelderly women. The authors used Tennessee Cancer Registry data from 2002 through 2008 and estimated a difference-in-difference model comparing women diagnosed with breast cancer who lived in low-income zip codes (and therefore were more likely to be subject to disenrollment) with a similar group of women who lived in high-income zip codes before and after the 2005 Medicaid disenrollment. The study outcomes were changes in stage of disease at the time of diagnosis and delays in treatment of >60 days and >90 days. Overall, nonelderly women in Tennessee were diagnosed at later stages of disease and experienced more delays in treatment in the period after disenrollment. Disenrollment was found to be associated with a 3.3-percentage point increase in late stage of disease at the time of diagnosis (P = .024), a 1.9-percentage point decrease in having a delay of >60 days in surgery (P = .024), and a 1.4-percentage point decrease in having a delay of >90 days in treatment (P = .054) for women living in low-income zip codes compared with women residing in high-income zip codes. The results of the current study indicate that Medicaid disenrollment is associated with a later stage of disease at the time of breast cancer diagnosis, thereby providing evidence of the potential negative health impacts of Medicaid contractions. Cancer 2017;123:3312-9. © 2017 American Cancer Society. © 2017 American Cancer Society.

  10. Sampling and analysis plan for treatment water and creek water for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document provides the Environmental Restoration Program with information about the methodology, organizational structure, quality assurance and health and safety practices to be employed during the water sampling and analysis activities associated with the remediation of the Lower East Fork Poplar Creek Operable Unit during remediation of the National Oceanic and Atmospheric Administration and Bruner sites.

  11. Sampling and analysis plan for treatment water and creek water for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This document provides the Environmental Restoration Program with information about the methodology, organizational structure, quality assurance and health and safety practices to be employed during the water sampling and analysis activities associated with the remediation of the Lower East Fork Poplar Creek Operable Unit during remediation of the National Oceanic and Atmospheric Administration and Bruner sites

  12. First Student Project at the University of Tennessee at Martin Observatory

    Science.gov (United States)

    Crews, Lionel J.; Turner, K.; Wesner, P.

    2011-05-01

    The University of Tennessee at Martin has recently completed the construction and setup of an observatory. The dome houses a 16" Meade telescope with SBIG STL-11000M CCD. For its first project, observations of the Delta Scuti type variable SZ Lynx were taken in March and analyzed using MiraPRO. A simple ephemeris calculation was done, and compared to previous results. This project was done under the University Scholars program, a four year scholarship program which includes a faculty-mentored research project.

  13. Radioanalytical laboratory quality control: Current status at Tennessee Valley Authority's western area radiological laboratory

    International Nuclear Information System (INIS)

    Rogers, W.J.

    1986-01-01

    The Tennessee Valley Authority operates a laboratory for radiological analysis of nuclear plant environmental monitoring samples and also for analysis of environmental samples from uranium mining and milling decommissioning activities. The laboratory analyzes some 9,000 samples per year and employs approximately 20 people as analysts, sample collectors, and supervisory staff members. The laboratory is supported by a quality control section of four people involved in computer support, production of radioactive standards, quality control data assessment and reporting, and internal reviews of compliance. The entire laboratory effort is controlled by 60 written procedures or standards. An HP-1000 computer and data base software are used to schedule samples for collection, assign and schedule samples within the laboratory for preparation and analysis, calculate sample activity, review data, and report data outside the laboratory. Gamma spectroscopy systems with nine germanium detectors, an alpha spectroscopy system, five alpha/beta counters, two liquid scintillation counters, four beta-gamma coincidence systems, two sodium iodide single-channel systems, and four photomultipliers for counting Lucas cells are all employed. Each device has various calibration and quality control checks performed on it routinely. Logbooks and control charts are in use for each instrument

  14. An Overview of the EAST Project

    International Nuclear Information System (INIS)

    Songtao Wu

    2006-01-01

    The China national project of Experimental Advanced Superconducting Tokamak (EAST) has been in its final engineering phase in the Institute of Plasma Physics, the Chinese Academy of Sciences (ASIPP). The year of 2006 is the important year for the EAST project. After six years hard work, the first engineering commissioning of EAST superconducting tokamak began with vacuum pumping on 7, Feb. The first charge of one of the PF coils was made on 13, Mar. The EAST superconducting tokamak is a full superconducting tokamak with a non-circle cross-section of the vacuum vessel and active cooling plasma facing components. The scientific and the engineering missions of the EAST project are to study physics issues of the advanced steady-state tokamak operations and to establish technology basis of full superconducting tokamaks. The EAST project features both superconducting toroidal field (TF) coils and poloidal field (PF) coils, continuous working (CW) non-inductive plasma current drive and heating systems, flexible and reliable PF system design to shape and control plasmas with big elongations and triangularity, real time data collection and feedback for steady-state profile control, active cooling and changeable plasma facing components (PFC) and advanced diagnostic measurements. During the past five years, the main R (and) D mainly focused on the design, fabrication and test of 16 kA CICC (Cable-in-Conduit Conductor) and the large scale superconducting magnet has been completed. The test results shown the performances of all superconducting magnets are well acceptable. For the deadlock configuration among the main components of the superconducting tokamak, the first commissioning was taken without the vacuum vessel ducts for easily disassembling if some important problems were found. In the commissioning, the TF system was charged up to 8 kA in 5000 s and the toroidal field at the major radius of 1.7 m is 2 T, which is 60% of the designed value. The reason why the TF system

  15. 75 FR 32839 - Norfolk Southern Railway Company-Trackage Rights Exemption-The West Tennessee Railroad, LLC

    Science.gov (United States)

    2010-06-09

    ... (Corinth), Miss.\\2\\ \\1\\ WTNN is a New Jersey limited liability company and NSR is a wholly owned subsidiary... Railway Company--Trackage Rights Exemption--The West Tennessee Railroad, LLC Pursuant to a written... rights to Norfolk Southern Railway Company (NSR) \\1\\ over approximately 118.9 miles of rail line...

  16. Zero carbon energy system of south east europe in 2050 - poster

    DEFF Research Database (Denmark)

    Dominkovic, Dominik Franjo; Bačeković, Ivan; Ćosić, Boris

    2016-01-01

    -neutral. Smart energy systems’approach has been used in planning of 100% RES, which considers significant integration of the electrical, heating and gas sectors. Many technologies have been employedin the year 2050, but the major share is put on photovoltaics and wind energy, followed by geothermal, solar......South East Europe consists of several smaller countries in terms of energy systems and thus, integrating energy systems of the whole region has significant benefits for allthe countries included. However, as there are large differences between energy mixes of the countries included, careful energy...... planning needs to be carried out in order tosatisfy energy needs of all the countries of the region.Due to the significant differences in geography and the climate of different parts of the region, many different technologies need to be introduced in order to have optimal,low-carbon energy mix...

  17. Phase 2 confirmatory sampling data report, Lower East Fork Poplar Creek, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    A Remedial Investigation of East Fork Poplar Creek (EFPC) concluded that mercury is the principal contaminant of concern in the EFPC floodplain. The highest concentrations of mercury were found to be in a visually distinct black layer of soil that typically lies 15 to 30 cm (6 to 12 in.) below the surface. Mercury contamination was found to be situated in distinct areas along the floodplain, and generally at depths > 20 cm (8 in.) below the surface. In accordance with Comprehensive, Environmental Response, Compensation, and Liability Act (CERCLA), a feasibility study was prepared to assess alternatives for remediation, and a proposed plan was issued to the public in which a preferred alternative was identified. In response to public input, the plan was modified and US Department of Energy (DOE) issued a Record of Decision in 1995 committing to excavating all soil in the EFPC floodplain exceeding a concentration of 400 parts per million (ppm) of mercury. The Lower East Fork Poplar Creek (LEFPC) remedial action (RA) focuses on the stretch of EFPC flowing from Lake Reality at the Y-12 Plant, through the city of Oak Ridge, to Poplar Creek on the Oak Ridge Reservation (ORR) and its associated floodplain. Specific areas were identified that required remediation at the National Oceanographic and Atmospheric Administration (NOAA) Site along Illinois Avenue and at the Bruner Site along the Oak Ridge Turnpike. The RA was conducted in two separate phases. Phase 2, conducted from February to October 1997, completed the remediation efforts at the NOAA facility and fully remediated the Bruner Site. During both phases, data were collected to show that the remedial efforts performed at the NOAA and Bruner sites were successful in implementing the Record of Decision and had no adverse impact on the creek water quality or the city of Oak Ridge publicly owned treatment works.

  18. Phase II confirmatory sampling data report, Lower East Fork Poplar Creek, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    A Remedial Investigation of East Fork Poplar Creek (EFPC) concluded that mercury is the principal contaminant of concern in the EFPC floodplain. The highest concentrations of mercury were found to be in a visually distinct black layer of soil that typically lies 15 to 30 cm (6 to 12 in.) below the surface. Mercury contamination was found to be situated in distinct areas along the floodplain, and generally at depths > 20 cm (8 in.) below the surface. In accordance with Comprehensive, Environmental Response, Compensation, and Liability Act (CERCLA), a feasibility study was prepared to assess alternatives for remediation, and a proposed plan was issued to the public in which a preferred alternative was identified. In response to public input, the plan was modified and US Department of Energy (DOE) issued a Record of Decision in 1995 committing to excavating all soil in the EFPC floodplain exceeding a concentration of 400 parts per million (ppm) of mercury. The Lower East Fork Poplar Creek (LEFPC) remedial action (RA) focuses on the stretch of EFPC flowing from Lake Reality at the Y-12 Plant, through the city of Oak Ridge, to Poplar Creek on the Oak Ridge Reservation (ORR) and its associated floodplain. Specific areas were identified that required remediation at the National Oceanographic and Atmospheric Administration (NOAA) Site along Illinois Avenue and at the Bruner Site along the Oak Ridge Turnpike. The RA was conducted in two separate phases. Phase 2, conducted from February to October 1997, completed the remediation efforts at the NOAA facility and fully remediated the Bruner Site. During both phases, data were collected to show that the remedial efforts performed at the NOAA and Bruner sites were successful in implementing the Record of Decision and had no adverse impact on the creek water quality or the city of Oak Ridge publicly owned treatment works

  19. The Effects of School Turnaround in Tennessee's Achievement School District and Innovation Zones

    Science.gov (United States)

    Zimmer, Ron; Henry, Gary T.; Kho, Adam

    2017-01-01

    In recent years, the federal government has invested billions of dollars to reform chronically low-performing schools. To fulfill their federal Race to the Top grant agreement, Tennessee implemented three turnaround strategies that adhered to the federal restart and transformation models: (a) placed schools under the auspices of the Achievement…

  20. High-altitude wind resources in the Middle East

    KAUST Repository

    Yip, Chak Man Andrew; Gunturu, Udaya; Stenchikov, Georgiy L.

    2017-01-01

    In the Middle East, near-surface wind resources are intermittent. However, high-altitude wind resources are abundant, persistent, and readily available and may provide alternative energy resources in this fossil-fuel-dependent region. Using wind field data from the Modern-Era Retrospective Analysis for Research and Applications Version 2 (MERRA-2), this study identifies areas favorable to the deployment of airborne wind energy (AWE) systems in the Middle East and computes the optimal heights at which such systems would best operate. AWE potential is estimated using realistic AWE system specifications and assumptions about deployment scenarios and is compared with the near-surface wind generation potential with respect to diurnal and seasonal variability. The results show the potential utility of AWE in areas in the Middle East where the energy demand is high. In particular, Oman and Saudi Arabia have a high level of the potential power generation with low annual variability.

  1. High-altitude wind resources in the Middle East

    KAUST Repository

    Yip, Chak Man Andrew

    2017-08-23

    In the Middle East, near-surface wind resources are intermittent. However, high-altitude wind resources are abundant, persistent, and readily available and may provide alternative energy resources in this fossil-fuel-dependent region. Using wind field data from the Modern-Era Retrospective Analysis for Research and Applications Version 2 (MERRA-2), this study identifies areas favorable to the deployment of airborne wind energy (AWE) systems in the Middle East and computes the optimal heights at which such systems would best operate. AWE potential is estimated using realistic AWE system specifications and assumptions about deployment scenarios and is compared with the near-surface wind generation potential with respect to diurnal and seasonal variability. The results show the potential utility of AWE in areas in the Middle East where the energy demand is high. In particular, Oman and Saudi Arabia have a high level of the potential power generation with low annual variability.

  2. Vitamin D deficiency: A potential risk factor for Clostridium difficile infection

    Directory of Open Access Journals (Sweden)

    Youssef D

    2012-10-01

    Full Text Available Dima Youssef,1 William B Grant,2 Alan N Peiris3,41Department of Internal Medicine, Division of Infectious Diseases, 2Sunlight, Nutrition and Health Research Center, San Francisco, CA USA; 3Department of Medicine, Mountain Home VAMC, 4Department of Medicine, East Tennessee State University, Johnson City, Tennessee, USAIn the July 3, 2012 issue of the journal of Risk Management and Healthcare Policy, Martinez et al present a nice review on Clostridium difficile (C. difficile infections.1 The different manifestations of this challenging disease along with the high cost and burden on the health care system were discussed. While the authors did an admirable job in discussing traditional risk factors, they do not mention vitamin D deficiency.View original paper by Martinez and colleagues.

  3. 2010 East Tennessee Technology Park Annual Illness and Injury Surveillance Report

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Health, Office of Health and Safety, Office of Illness and Injury Prevention Programs

    2011-08-16

    The U.S. Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of illness and injury surveillance activities that provide an early warning system to detect health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence, occupational injuries and illnesses, and disabilities and deaths among current workers.

  4. 2007 East Tennessee Technology Park Annual Illness and Injury Surveillance Report

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety, and Security

    2009-07-13

    The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of illness and injury surveillance activities that provide an early warning system to detect health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence, occupational injuries and illnesses, and disabilities and deaths among current workers.

  5. An operational wave forecasting system for the east coast of India

    Science.gov (United States)

    Sandhya, K. G.; Murty, P. L. N.; Deshmukh, Aditya N.; Balakrishnan Nair, T. M.; Shenoi, S. S. C.

    2018-03-01

    Demand for operational ocean state forecasting is increasing, owing to the ever-increasing marine activities in the context of blue economy. In the present study, an operational wave forecasting system for the east coast of India is proposed using unstructured Simulating WAves Nearshore model (UNSWAN). This modelling system uses very high resolution mesh near the Indian east coast and coarse resolution offshore, and thus avoids the necessity of nesting with a global wave model. The model is forced with European Centre for Medium-Range Weather Forecasts (ECMWF) winds and simulates wave parameters and wave spectra for the next 3 days. The spatial pictures of satellite data overlaid on simulated wave height show that the model is capable of simulating the significant wave heights and their gradients realistically. Spectral validation has been done using the available data to prove the reliability of the model. To further evaluate the model performance, the wave forecast for the entire year 2014 is evaluated against buoy measurements over the region at 4 waverider buoy locations. Seasonal analysis of significant wave height (Hs) at the four locations showed that the correlation between the modelled and observed was the highest (in the range 0.78-0.96) during the post-monsoon season. The variability of Hs was also the highest during this season at all locations. The error statistics showed clear seasonal and geographical location dependence. The root mean square error at Visakhapatnam was the same (0.25) for all seasons, but it was the smallest for pre-monsoon season (0.12 m and 0.17 m) for Puducherry and Gopalpur. The wind sea component showed higher variability compared to the corresponding swell component in all locations and for all seasons. The variability was picked by the model to a reasonable level in most of the cases. The results of statistical analysis show that the modelling system is suitable for use in the operational scenario.

  6. Geologic map of the Leadville North 7.5’ quadrangle, Eagle and Lake Counties, Colorado

    Science.gov (United States)

    Ruleman, Chester A.; Brandt, Theodore R.; Caffee, Marc W.; Goehring, Brent M.

    2018-04-24

    The Leadville North 7.5’ quadrangle lies at the northern end of the Upper Arkansas Valley, where the Continental Divide at Tennessee Pass creates a low drainage divide between the Colorado and Arkansas River watersheds. In the eastern half of the quadrangle, the Paleozoic sedimentary section dips generally 20–30 degrees east. At Tennessee Pass and Missouri Hill, the core of the Sawatch anticlinorium is mapped as displaying a tight hanging-wall syncline and foot-wall anticline within the basement-cored structure. High-angle, west-dipping, Neogene normal faults cut the eastern margin of the broad, Sawatch anticlinorium. Minor displacements along high-angle, east- and west-dipping Laramide reverse faults occurred in the core of the north-plunging anticlinorium along the western and eastern flanks of Missouri Hill. Within the western half of the quadrangle, Meso- and Paleoproterozoic metamorphic and igneous rocks are uplifted along the generally east-dipping, high-angle Sawatch fault system and are overlain by at least three generations of glacial deposits in the western part of the quadrangle. 10Be and 26Al cosmogenic nuclide ages of the youngest glacial deposits indicate a last glacial maximum age of about 21–22 kilo-annum and complete deglaciation by about 14 kilo-annum, supported by chronologic studies in adjacent drainages. No late Pleistocene tectonic activity is apparent within the quadrangle.

  7. A Comparison of Male and Female Addicts and Non-Addicts on the Tennessee Self Concept Scale.

    Science.gov (United States)

    Jarka, Joyce M.

    Many mental health professionals ignore chemical addiction, whereas many chemical dependency professionals see addiction as the entire problem and ignore everything else. This study investigated differences between addicts and non-addicts on the Tennessee Self Concept Scale. Subjects were undergraduate and graduate students, selected from a…

  8. Structural Evolution of the East Sierra Valley System (Owens Valley and Vicinity, California: A Geologic and Geophysical Synthesis

    Directory of Open Access Journals (Sweden)

    Richard J. Blakely

    2013-04-01

    Full Text Available The tectonically active East Sierra Valley System (ESVS, which comprises the westernmost part of the Walker Lane-Eastern California Shear Zone, marks the boundary between the highly extended Basin and Range Province and the largely coherent Sierra Nevada-Great Valley microplate (SN-GVm, which is moving relatively NW. The recent history of the ESVS is characterized by oblique extension partitioned between NNW-striking normal and strike-slip faults oriented at an angle to the more northwesterly relative motion of the SN-GVm. Spatially variable extension and right-lateral shear have resulted in a longitudinally segmented valley system composed of diverse geomorphic and structural elements, including a discontinuous series of deep basins detected through analysis of isostatic gravity anomalies. Extension in the ESVS probably began in the middle Miocene in response to initial westward movement of the SN-GVm relative to the Colorado Plateau. At ca. 3–3.5 Ma, the SN-GVm became structurally separated from blocks directly to the east, resulting in significant basin-forming deformation in the ESVS. We propose a structural model that links high-angle normal faulting in the ESVS with coeval low-angle detachment faulting in adjacent areas to the east.

  9. Leadership and transformational change in healthcare organisations: a qualitative analysis of the North East Transformation System.

    Science.gov (United States)

    Erskine, Jonathan; Hunter, David J; Small, Adrian; Hicks, Chris; McGovern, Tom; Lugsden, Ed; Whitty, Paula; Steen, Nick; Eccles, Martin Paul

    2013-02-01

    The research project 'An Evaluation of Transformational Change in NHS North East' examines the progress and success of National Health Service (NHS) organisations in north east England in implementing and embedding the North East Transformation System (NETS), a region-wide programme to improve healthcare quality and safety, and to reduce waste, using a combination of Vision, Compact, and Lean-based Method. This paper concentrates on findings concerning the role of leadership in enabling tranformational change, based on semi-structured interviews with a mix of senior NHS managers and quality improvement staff in 14 study sites. Most interviewees felt that implementing the NETS requires committed, stable leadership, attention to team-building across disciplines and leadership development at many levels. We conclude that without senior leader commitment to continuous improvement over a long time scale and serious efforts to distribute leadership tasks to all levels, healthcare organisations are less likely to achieve positive changes in managerial-clinical relations, sustainable improvements to organisational culture and, ultimately, the region-wide step change in quality, safety and efficiency that the NETS was designed to deliver. © The Author(s) 2013 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.

  10. Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956)- An Assessment of Quantities released, Off-Site Radiation Doses, and Potential Excess Risks of Thyroid Cancer, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Apostoaei, A.I.; Burns, R.E.; Hoffman, F.O.; Ijaz, T.; Lewis, C.J.; Nair, S.K.; Widner, T.E.

    1999-07-01

    In the early 1990s, concern about the Oak Ridge Reservation's past releases of contaminants to the environment prompted Tennessee's public health officials to pursue an in-depth study of potential off-site health effects at Oak Ridge. This study, the Oak Ridge dose reconstruction, was supported by an agreement between the U.S. Department of Energy (DOE) and the State of Tennessee, and was overseen by a 12-member panel appointed by Tennessee's Commissioner of Health. One of the major contaminants studied in the dose reconstruction was radioactive iodine, which was released to the air by X-10 (now called Oak Ridge National Laboratory) as it processed spent nuclear reactor fuel from 1944 through 1956. The process recovered radioactive lanthanum for use in weapons development. Iodine concentrates in the thyroid gland so health concerns include various diseases of the thyroid, such as thyroid cancer. The large report, ''Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956) - An Assessment of Quantities Released, Off-site Radiation Doses, and Potential Excess Risks of Thyroid Cancer,'' is in two volumes. Volume 1 is the main body of the report, and Volume 1A, which has the same title, consists of 22 supporting appendices. Together, these reports serve the following purposes: (1) describe the methodologies used to estimate the amount of iodine-131 (I-131) released; (2) evaluate I-131's pathway from air to vegetation to food to humans; (3) estimate doses received by human thyroids; (4) estimate excess risk of acquiring a thyroid cancer during ones lifetime; and (5) provide equations, examples of historical documents used, and tables of calculated values. Results indicate that females born in 1952 who consumed milk from a goat pastured a few miles east of X-10 received the highest doses from I-131 and would have had the highest risks of contracting thyroid cancer. Doses from cow

  11. 2016 Federal Green Challenge Award Winners in the Southeast Region

    Science.gov (United States)

    2016 FGC award winners in the Southeast are: the Department of Human Services’ U.S. Citizenship and Immigration Services Southeast Regional Office and Department of Energy’s East Tennessee Technology Park.

  12. Integration of Environmental Restoration and Waste Management Activities for a More Cost-Effective Tank Remediation Program Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Brill, A.; Clark, R.; Stewart, R.

    1998-01-01

    This paper presents plans and strategies for remediation of the liquid low-level radioactive waste (LLLW) tanks that have been removed from service (also known as inactive tanks) at Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. Much of the LLLW system at ORNL was installed more than 50 years ago. The overall objective of the Inactive Tank Program is to remediate all LLLW tanks that have been removed from service to the extent practicable in accordance with the regulatory requirements

  13. Tectonics of East Siberian Sea Basin and its influence on petroleum systems

    Science.gov (United States)

    Karpov, Yury; Antonina, Stoupakova; Anna, Suslova; Mariia, Agasheva

    2016-04-01

    The East Siberian Sea basin (ESSB) is the largest part of the Siberian Arctic shelf, extending for over 1000 km from New Siberian Islands archipelago to Wrangel Island. Nowadays East Siberian Sea margin is considered as a region with probable high petroleum potential. This part of Russian Arctic shelf is the least studied. The major problems in geological investigation of East Siberian Sea shelf are absence of deep wells in area and low seismic exploration maturity. Only general conclusions on its geology and hydrocarbon systems can be drawn based on limited seismic, gravity and magnetic data, supported by projection of onshore geological data to offshore. So, that's why now only complex geological and seismic stratigraphy interpretations are provided. Today we have several concepts and can summarize the tectonic history of the basin. The basin is filled with siliclastic sediments. In the deepest depocentres sediments thickness exceed 8 km in average. Seismic data was interpreted using methods of seismic stratigraphy. Stratigraphic interpretation was possible to achieve because seismic reflections follow chronostratigraphic correlations. Finally, main seismic horizons were indicated. Each indicated horizon follows regional stratigraphic unconformity. In case of absence of deep wells in ESSB, we can only prove possible source rocks by projection of data about New Siberian Islands archipelago source rocks on offshore. The petroleum potential of these rocks was investigated by several authors [1, 2, 3]. Perspective structures, investigated in ESSB were founded out by comparing seismogeological cross-sections with explored analogs in other Russian and foreign onshore and offshore basins. The majority of structures could be connected with stratigraphic and fault traps. New data on possible petroleum plays was analyzed, large massif of data on geology and tectonic history of the region was collected, so now we can use method of basin modelling to evaluate hydrocarbon

  14. North-East Asian Super Grid: Renewable energy mix and economics

    Science.gov (United States)

    Breyer, Christian; Bogdanov, Dmitrii; Komoto, Keiichi; Ehara, Tomoki; Song, Jinsoo; Enebish, Namjil

    2015-08-01

    Further development of the North-East Asian energy system is at a crossroads due to severe limitations of the current conventional energy based system. For North-East Asia it is proposed that the excellent solar and wind resources of the Gobi desert could enable the transformation towards a 100% renewable energy system. An hourly resolved model describes an energy system for North-East Asia, subdivided into 14 regions interconnected by high voltage direct current (HVDC) transmission grids. Simulations are made for highly centralized, decentralized and country-wide grids scenarios. The results for total system levelized cost of electricity (LCOE) are 0.065 and 0.081 €/(kW·h) for the centralized and decentralized approaches for 2030 assumptions. The presented results for 100% renewable resources-based energy systems are lower in LCOE by about 30-40% than recent findings in Europe for conventional alternatives. This research clearly indicates that a 100% renewable resources-based energy system is THE real policy option.

  15. Tennessee Valley Authority National Fertilizer and Environmental Research Center

    International Nuclear Information System (INIS)

    Gautney, J.

    1991-01-01

    The National Fertilizer and Environmental Research Center (NFERC) is a unique part of the Tennessee Valley Authority (TVA), a government agency created by an Act of Congress in 1933. The Center, located in Muscle Shoals, Alabama, is a national laboratory for research, development, education and commercialization for fertilizers and related agricultural chemicals including their economic and environmentally safe use, renewable fuel and chemical technologies, alternatives for solving environmental/waste problems, and technologies which support national defense- NFERC projects in the pesticide waste minimization/treatment/disposal areas include ''Model Site Demonstrations and Site Assessments,'' ''Development of Waste Treatment and Site Remediation Technologies for Fertilizer/Agrichemical Dealers,'' ''Development of a Dealer Information/Education Program,'' and ''Constructed Wetlands.''

  16. Tunable biasing magnetic field design of ferrite tuner for ICRF heating system in EAST

    Science.gov (United States)

    Manman, XU; Yuntao, SONG; Gen, CHEN; Yanping, ZHAO; Yuzhou, MAO; Guang, LIU; Zhen, PENG

    2017-11-01

    Ion cyclotron range of frequency (ICRF) heating has been used in tokamaks as one of the most successful auxiliary heating tools and has been adopted in the EAST. However, the antenna load will fluctuate with the change of plasma parameters in the ICRF heating process. To ensure the steady operation of the ICRF heating system in the EAST, fast ferrite tuner (FFT) has been carried out to achieve real-time impedance matching. For the requirements of the FFT impedance matching system, the magnet system of the ferrite tuner (FT) was designed by numerical simulations and experimental analysis, where the biasing magnetic circuit and alternating magnetic circuit were the key researched parts of the ferrite magnet. The integral design goal of the FT magnetic circuit is that DC bias magnetic field is 2000 Gs and alternating magnetic field is ±400 Gs. In the FTT, E-type magnetic circuit was adopted. Ferrite material is NdFeB with a thickness of 30 mm by setting the working point of NdFeB, and the ampere turn of excitation coil is 25 through the theoretical calculation and simulation analysis. The coil inductance to generate alternating magnetic field is about 7 mH. Eddy-current effect has been analyzed, while the magnetic field distribution has been measured by a Hall probe in the medium plane of the biasing magnet. Finally, the test results show the good performance of the biasing magnet satisfying the design and operating requirements of the FFT.

  17. A web based MDSplus data analysis and visualization system for EAST

    Energy Technology Data Exchange (ETDEWEB)

    Yang, F., E-mail: fyang@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Department of Computer Science, Anhui Medical University, Hefei (China); Xiao, B.J. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China)

    2012-12-15

    Highlights: Black-Right-Pointing-Pointer We design and implement a web based visualization system for MDSplus using java technology. Black-Right-Pointing-Pointer In order to speed up data display (short pulse or long pulse), we adopt three new methods: frequency reduction, slice display and thumbnail. Black-Right-Pointing-Pointer The slice is combined with the frequency reduction to solve the problems of long pulse data access. Black-Right-Pointing-Pointer Data of various experiments in different servers can be viewed in either a single panel or multiple frames, which makes it easier for cross comparison among different data sources. - Abstract: In an EAST (Experimental Advanced Superconducting Tokamak) experiment, the convenient data analysis and visualization tools are very important for physicists and engineering experts to view the operational status of the device. Along with the increasing data sampling rate and pulse length, it will be increasingly challenging for the end user to view the data conveniently under limited Internet bandwidth. We propose a software based on jScope [1] called WebScope for data visualization. By applying java applet techniques, this software can be accessed directly over the Internet via a variety of web browsers without installing client software. Using this data viewer the frequency will be effectively adjusted according to the computer displaying resolution, which saves the total amount of data to be transferred across the Internet and enables the user to view the data quickly. When the signals are zoomed or unzoomed, the data frequency will be re-adjusted to the displaying resolution. With WebScope, data of various experiments in different servers can be viewed in either a single panel or multiple frames, which makes it easier for cross comparison among different data sources. The system was successfully applied to EAST experiment and achieved excellent performance. Its design, function and implementation details will be

  18. A web based MDSplus data analysis and visualization system for EAST

    International Nuclear Information System (INIS)

    Yang, F.; Xiao, B.J.

    2012-01-01

    Highlights: ► We design and implement a web based visualization system for MDSplus using java technology. ► In order to speed up data display (short pulse or long pulse), we adopt three new methods: frequency reduction, slice display and thumbnail. ► The slice is combined with the frequency reduction to solve the problems of long pulse data access. ► Data of various experiments in different servers can be viewed in either a single panel or multiple frames, which makes it easier for cross comparison among different data sources. - Abstract: In an EAST (Experimental Advanced Superconducting Tokamak) experiment, the convenient data analysis and visualization tools are very important for physicists and engineering experts to view the operational status of the device. Along with the increasing data sampling rate and pulse length, it will be increasingly challenging for the end user to view the data conveniently under limited Internet bandwidth. We propose a software based on jScope [1] called WebScope for data visualization. By applying java applet techniques, this software can be accessed directly over the Internet via a variety of web browsers without installing client software. Using this data viewer the frequency will be effectively adjusted according to the computer displaying resolution, which saves the total amount of data to be transferred across the Internet and enables the user to view the data quickly. When the signals are zoomed or unzoomed, the data frequency will be re-adjusted to the displaying resolution. With WebScope, data of various experiments in different servers can be viewed in either a single panel or multiple frames, which makes it easier for cross comparison among different data sources. The system was successfully applied to EAST experiment and achieved excellent performance. Its design, function and implementation details will be introduced in this paper.

  19. The 3D Elevation Program: summary for Tennessee

    Science.gov (United States)

    Carswell, William J.

    2014-01-01

    Elevation data are essential to a broad range of applications, including forest resources management, wildlife and habitat management, national security, recreation, and many others. For the State of Tennessee, elevation data are critical for agriculture and precision farming, flood risk management, natural resources conservation, infrastructure and construction management, forest resources management, aviation navigation and safety, and other business uses. Today, high-density light detection and ranging (lidar) data are the primary sources for deriving elevation models and other datasets. Federal, State, Tribal, and local agencies work in partnership to (1) replace data that are older and of lower quality and (2) provide coverage where publicly accessible data do not exist. A joint goal of State and Federal partners is to acquire consistent, statewide coverage to support existing and emerging applications enabled by lidar data.

  20. An aerial radiological survey of the Oak Ridge Reservation and surrounding area, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Maurer, R.J.

    1989-09-01

    An aerial radiological survey of the Oak Ridge Reservation (ORR) and surrounding area in Oak Ridge, Tennessee, was conducted from September 12--29, 1989. The purpose of the survey was to measure and document the site's terrestrial radiological environment for use in effective environmental management and emergency response planning. The aerial survey was flown at an altitude of 91 meters (300 feet) along a series of parallel lines 152 meters (500 feet) apart. The survey encompassed an area of 440 square kilometers (170 square miles) as defined by the Tennessee Valley Authority Map S-16A of the entire Oak Ridge Reservation and adjacent area. The results of the aerial survey are reported as inferred exposure rates at 1 meter above ground level (AGL) in the form of a radiation contour map. Typical background exposure rates were found to vary from 5 to 14 microroentgens per hour (μR/h). The man-made radionuclides, cobalt-60, cesium-137, and protactinium-234m (a radioisotope indicative of depleted uranium), were detected at several facilities on the site. In support of the aerial survey, ground-based exposure rate and soil sample measurements were obtained at several locations within the survey boundary. In addition to the large scale aerial survey, two special flyovers were requested by the Department of Energy. The first request was to conduct a survey of a 1-mile x 2-mile area in south Knoxville, Tennessee. The area had been used previously to store contaminated scrap metals from operations at the Oak Ridge site. The second request was to fly several passes over a 5-mile length of railroad tracks leading from the Oak Ridge Y-12 Plant, north through the city of Oak Ridge. The railroad tracks had been previously used in the transport of cesium-137

  1. 2011 Remediation Effectiveness Report for the U.S. Department of Energy Oak Ridge Reservation, Oak Ridge, Tennessee - Data and Evaluations

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Jacobs

    2011-03-01

    Under the requirements of the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency, (EPA) and the Tennessee Department of Environment and Conservation (TDEC) in 1992, all environmental restoration activities on the ORR are performed in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Since the 1990s, the environmental restoration activities have experienced a gradual shift from characterization to remediation. As this has occurred, it has been determined that the assessment of the individual and cumulative performance of all ORR CERCLA remedial actions (RAs) is most effectively tracked in a single document. The Remediation Effectiveness Report (RER) is an FFA document intended to collate all ORR CERCLA decision requirements, compare pre- and post-remediation conditions at CERCLA sites, and present the results of any required post-decision remediation effectiveness monitoring. First issued in 1997, the RER has been reissued annually to update the performance histories of completed actions and to add descriptions of new CERCLA actions. Monitoring information used in the 2011 RER to assess remedy performance was collected and/or compiled by DOE's Water Resources Restoration Program (WRRP). Only data used to assess performance of completed actions are provided. In addition to collecting CERCLA performance assessment data, the WRRP also collects baseline data to be used to gauge the effectiveness of future actions once implemented. These baseline data are maintained in the Oak Ridge Environmental Information System and will be reported in future RERs, as necessary, once the respective actions are completed. However, when insufficient data exist to assess the impact of the RAs, e.g., when the RA was only recently completed, a preliminary evaluation is made of early indicators of effectiveness at the

  2. 2010 Remediation Effectiveness Report for the U.S. Department of Energy Oak Ridge Reservation, Oak Ridge, Tennessee - Data and Evaluations

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Jacobs

    2010-09-01

    Under the requirements of the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency, (EPA) and the Tennessee Department of Environment and Conservation (TDEC) in 1992, all environmental restoration activities on the ORR are performed in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Since the 1990s, the environmental restoration activities have experienced a gradual shift from characterization to remediation. As this has occurred, it has been determined that the assessment of the individual and cumulative performance of all ORR CERCLA remedial actions (RAs) is most effectively tracked in a single document. The Remediation Effectiveness Report (RER) is an FFA document intended to collate all ORR CERCLA decision requirements, compare pre- and post-remediation conditions at CERCLA sites, and present the results of any required post-decision remediation effectiveness monitoring. First issued in 1997, the RER has been reissued annually to update the performance histories of completed actions and to add descriptions of new CERCLA actions. Monitoring information used in the 2010 RER to assess remedy performance was collected and/or compiled by DOE's Water Resources Restoration Program (WRRP). Only data used to assess performance of completed actions are provided. In addition to collecting CERCLA performance assessment data, the WRRP also collects baseline data to be used to gauge the effectiveness of future actions once implemented. These baseline data are maintained in the Oak Ridge Environmental Information System and will be reported in future RERs, as necessary, once the respective actions are completed. However, when insufficient data exist to assess the impact of the RAs, e.g., when the RA was only recently completed, a preliminary evaluation is made of early indicators of effectiveness at the

  3. A PROGRAM OF ADULT EDUCATION FOR THE MARSHALL COUNTY HIGH SCHOOL SERVICE AREA, LEWISBURG, TENNESSEE.

    Science.gov (United States)

    BARNES, JOHN O., JR.

    THE NEED FOR AN ADULT EDUCATION PROGRAM IN THE MARSHALL COUNTY (TENNESSEE) HIGH SCHOOL SERVICE AREA WAS STUDIED THROUGH QUESTIONNAIRES COMPLETED BY 207 ADULTS, EXAMINATION OF SCHOOL AND GOVERNMENT RECORDS, AND PERSONAL INTERVIEWS. IT WAS FOUND THAT OVER HALF OF THE AREA RESIDENTS WERE NOT HIGH SCHOOL GRADUATES, AND THAT MANY ADULTS DESIRED MORE…

  4. 78 FR 23704 - Approval and Promulgation of Implementation Plans; Tennessee: New Source Review-Prevention of...

    Science.gov (United States)

    2013-04-22

    ...) Program for Particulate Matter Less Than 2.5 Micrometers (PM 2.5 ): Amendment to the Definition of..., 2008, NSR PM 2.5 Rule including the term ``particulate matter emissions,'' in the definition of... matter emissions into the Tennessee SIP (at rule 1200-03-09-.01(4)(b)47(vi)) as part of the definition...

  5. Comparing Student Achievement in Single-Gender and Coeducational Classrooms Using the Tennessee Comprehensive Achievement Program

    Science.gov (United States)

    Young, La Sandra M.

    2016-01-01

    Schools across the nation are faced with an increased urgency to seek innovative strategies to improve low academic performance of students as mandated by No Child Left Behind Legislation (Friend, 2006). Specifically, in the state of Tennessee in schools such as those located in the Shelby County Schools District who have experienced low student…

  6. Final review of the Campbell Creek demonstrations showcased by Tennessee Valley Authority

    Energy Technology Data Exchange (ETDEWEB)

    Gehl, Anthony C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Munk, Jeffrey D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Jackson, Roderick K. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Boudreaux, Philip R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Miller, William A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); New, Joshua Ryan [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Khowailed, Giannate [SRA International, Fairfax, VA (United States)

    2015-06-01

    The Tennessee Valley Authority (TVA) Technology Innovation, Energy Efficiency, Power Delivery and Utilization Office funded and managed a showcase demonstration located in the suburbs of west Knox county, Tennessee. Work started March 2008 with the goal of documenting best practices for retrofitting existing homes and for building new high-efficiency homes. The Oak Ridge National Laboratory and the Electric Power Research Institute (EPRI) provided technical support. An analytical base was developed for helping homeowners, homebuyers, builders, practitioners and the TVA make informed economic decisions for the materials and incentives necessary to build a new high-efficiency home or retrofit an existing home. New approaches to more efficiently control active energy subsystems and information for selecting or upgrading to Energy Star appliances, changing all lights to 100% CFL s and upgrading windows to low-E gas filled glazing yields a 40% energy savings with neutral cash flow for the homeowner. Passive designs were reviewed and recommendations made for envelope construction that is durable and energy efficient. The Campbell Creek project complements the DOE Building Technologies Program strategic goal. Results of the project created technologies and design approaches that will yield affordable energy efficient homes. The 2010 DOE retrofit goals are to find retrofit packages that attain 30% whole house energy savings as documented by pre and post Home Energy rating scores (HERS). Campbell Creek met these goals.

  7. Analysis and optimization on in-vessel inspection robotic system for EAST

    International Nuclear Information System (INIS)

    Zhang, Weijun; Zhou, Zeyu; Yuan, Jianjun; Du, Liang; Mao, Ziming

    2015-01-01

    Since China has successfully built her first Experimental Advanced Superconducting TOKAMAK (EAST) several years ago, great interest and demand have been increasing in robotic in-vessel inspection/operation systems, by which an observation of in-vessel physical phenomenon, collection of visual information, 3D mapping and localization, even maintenance are to be possible. However, it has been raising many challenges to implement a practical and robust robotic system, due to a lot of complex constraints and expectations, e.g., high remanent working temperature (100 °C) and vacuum (10"−"3 pa) environment even in the rest interval between plasma discharge experiments, close-up and precise inspection, operation efficiency, besides a general kinematic requirement of D shape irregular vessel. In this paper we propose an upgraded robotic system with redundant degrees of freedom (DOF) manipulator combined with a binocular vision system at the tip and a virtual reality system. A comprehensive comparison and discussion are given on the necessity and main function of the binocular vision system, path planning for inspection, fast localization, inspection efficiency and success rate in time, optimization of kinematic configuration, and the possibility of underactuated mechanism. A detailed design, implementation, and experiments of the binocular vision system together with the recent development progress of the whole robotic system are reported in the later part of the paper, while, future work and expectation are described in the end.

  8. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2, (Docket Nos. 50-390 and 50-391), Tennessee Valley Authority

    International Nuclear Information System (INIS)

    1992-06-01

    This report supplements the Safety Evaluation Report (SER), NUREG- 0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), and Supplement No. 8 (January 1992) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). The facility is located in Rhea County, Tennessee near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER

  9. The Distribution of Health Services in Iran Health Care System: A Case Study at East Azerbaijan

    Directory of Open Access Journals (Sweden)

    Hassan Almaspoor-khangah

    2016-10-01

    Full Text Available Background: It is necessary that various aspects of health information and statistics are identified and measured since health problems are getting more complex day by day. Objective: This study is aimed to investigate the distribution of health services in the health care system in Iran and the case of study is East Azerbaijan province. Methods: This research was a retrospective, descriptive, cross-sectional study. The statistical population included all health service providers in East Azerbaijan Province in the public, private, charity, military, social security, and NGO sectors. In this study, the data from all functional health sectors, including hospitals, health centers, and clinical, rehabilitation centers and all clinics and private offices were studied during 2014. The data relevant to performance were collected according to a pre-determined format (researcher- built checklist which was approved by five professionals and experts Health Services Management (content validity. Results: The study findings showed that the public sector by 45.28% accounted for the highest share of provided services and the private sector, social security, military institutions, charities and NGOs institutions by 25.47%, 18.92%, 4.37%, 3.3%, and 2.66% next rank in providing health services in East Azerbaijan province have been allocated. Conclusion: The results show that most of the health services in East Azerbaijan Province belongs to the public sector and the private sector has managed to develop its services in some parts surpassed the public sector. According to the study findings, Policies should be aimed to create balance and harmony in the provision of services among all service providers.

  10. Development of plasma fueling on EAST

    International Nuclear Information System (INIS)

    Yao, X.J.; Zheng, X.W.; Li, C.Z.; Chen, Y.

    2015-01-01

    To achieve better plasma density control, experimental advanced superconducting tokamak (EAST) has already equipped with gas puffing (GP), supersonic molecular beam injection (SMBI) and pellet injection (PI). During the past few years, lots of experiments and ameliorations have been done. The performance of the SMBI and gas puffing (GP) feedback systems were used and compared. And the preliminary result of pellet injection was also presented here. The results shows the PI and SMBI were more compatible to the long pulse high density discharge on EAST. (author)

  11. 21st Century jobs initiative - building the foundations for a 21st Century economy. Final main report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The 21st Century Jobs Initiative has been launched in the context of new realities in Washington, D.C., rapid restructuring of the US economy and accelerating changes in the makeup of the East Tennessee economy driven by these and other external economic forces. Continuing downward pressure on Federal budgets for programs that support three key institutions in the region - DOE`s Oak Ridge complex, the Tennessee Valley Authority and research programs of the University of Tennessee - are especially threatening to the region. With a large part of its economy dependent on Federal spending, the area is at risk of troublesome impacts that could ripple out from the Oak Ridge and Knoxville home of these institutions throughout the entire 15-county {open_quotes}Resource Valley.{close_quotes} As these economic forces play out in the region`s economy, important questions arise. How will East Tennessee {open_quotes}earn its living{close_quotes} in the future if the Federal government role in the economy shrinks? What kind of new industries will be formed to replace those at risk due to Federal cutbacks and economic restructuring? Where will the jobs come from for the next generation of job seekers? These are among the questions driving the 21st Century Jobs Initiative, an action-oriented program designed and implemented by local leaders in response to the economic challenges facing East Tennessee. Fortunately, the region`s economy is strong today. Unemployment is at near record lows in most counties. Moreover, leaders are increasingly aware of the threats on the horizon and are already moving to action. And the impacts from the forces at work on the economy will probably come slowly, over the next decade or so. Based on economic research and input from local leaders knowledgeable about the economy, the 21st Century Jobs Initiative has set forth a strategic economic development plan for the region.

  12. West and East

    Directory of Open Access Journals (Sweden)

    Alexander Rappaport

    2017-12-01

    Full Text Available The topic “West-East” has a clear cultural and historical meaning. Orthodox temples face East. The way from West to East and from East to West is tens of thousands of kilometers long and has a special meaning. It differs from the way from North to South: the horizontal axes connect regions, while the vertical axis (Earth-Sky connects the worlds. The expansion of Eurasian tribes occurred along the East-West axis – the world horizontal way. Today the cultural memory of people in the East and West finds itself in the theatre of new dramas of existence and new forces. With the advances in electronic technologies, the world movements seem to have sunk in the depth of the chthonian past to come up anew to the surface of fantastic speeds and momentary connections. A new type of planetary landscape-space relation appears, giving no place for West and East.

  13. Race to the Top. Tennessee Report. Year 3: School Year 2012-2013. [State-Specific Summary Report

    Science.gov (United States)

    US Department of Education, 2014

    2014-01-01

    This State-specific summary report serves as an assessment of Tennessee's annual Race to the Top implementation. The Year 3 report for Phase 1 and 2 grantees highlights successes and accomplishments, identifies challenges, and provides lessons learned from implementation from approximately September 2012 through September 2013. In Year 3,…

  14. Calendar Year 2005 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None

    2006-09-01

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2005 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2005 monitoring data were obtained from groundwater and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge south of Y-12. The CY 2005 monitoring data were obtained under the Y-12 Groundwater Protection Program (GWPP) managed by BWXT Y-12, L.L.C. (BWXT) and several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Data contained in this report meet applicable requirements of DOE Order 450.1 (Environmental Protection Program) regarding evaluation of groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). However, detailed analysis, evaluation, and interpretation of the CY 2005 monitoring data is deferred to the ''Y-12 Groundwater Protection Program Groundwater Monitoring Data Compendium'' (BWXT 2006). For each monitoring well, spring, and surface water sampling station included in this report, the GWPP Compendium provides: (1) pertinent well installation and construction information; (2) a complete sampling history, including

  15. Calendar Year 2004 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2005-09-01

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2004 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2004 monitoring data were obtained from groundwater and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge south of Y-12. The CY 2004 monitoring data were obtained under the Y-12 Groundwater Protection Program (GWPP) managed by BWXT Y-12, L.L.C. (BWXT) and several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Data contained in this report meet applicable requirements of DOE Order 450.1 (Environmental Protection Program) regarding evaluation of groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). However, detailed analysis, evaluation, and interpretation of the CY 2004 monitoring data is deferred to the Y-12 Groundwater Protection Program Groundwater Monitoring Data Compendium (BWXT 2005). For each monitoring well, spring, and surface water sampling station included in this report, the GWPP Compendium provides: (1) pertinent well installation and construction information; (2) a complete sampling history, including sampling methods and

  16. Ground-water quality for Grainger County, Tennessee

    Science.gov (United States)

    Weaver, J.D.; Patel, A.R.; Hickey, A.C.

    1994-01-01

    The residents of Grainger County depend on ground water for many of their daily needs including personal consumption and crop irrigation. To address concerns associated with ground-water quality related to domestic use, the U.S. Geological Survey collected water samples from 35 wells throughout the county during the summer 1992. The water samples were analyzed to determine if pesticides, nutrients, bacteria, and other selected constituents were present in the ground water. Wells selected for the study were between 100 and 250 feet deep and yielded 10 to 50 gallons of water per minute. Laboratory analyses of the water found no organic pesticides at concentrations exceeding the primary maximum contaminant levels established by the State of Tennessee for wells used for public supply. However, fecal coliform bacteria were detected at concentrations exceeding the State's maximum contaminant level in water from 15 of the 35 wells sampled. Analyses also indicated several inorganic compounds were present in the water samples at concentrations exceeding the secondary maximum contaminant level.

  17. A new long-pulse data system for EAST experiments

    International Nuclear Information System (INIS)

    Yang, F.; Xiao, B.J.; Wang, F.; Li, S.; Huang, W.J.

    2014-01-01

    Highlights: • Slice storage mechanism on MDSplus has been adopted for the effective solutions to the continuous and quasi real-time data storage. • Using circular linked list method solves the speed mismatch between the network transmission and the MDSplus writing. • Using LVS (Linux Virtual server) load balance technology, the new system provides a safe, highly scalable and highly available network service for user to access data. - Abstract: A long pulse discharge requires high throughput data acquisition. As more physics diagnostics with high sampling rate are applied and the pulse length becomes longer, the original EAST (Experimental Advanced Superconducting Tokamak) data system no longer satisfies the requirements of real-time data storage and quick data access. A new system was established to integrate various data acquisition hardware and software for easy expansion and management of the system. Slice storage mechanism in MDSplus is now being used for the continuous and quasi real-time data storage. For every data acquisition thread and process, sufficient network bandwidth is ensured. Moreover, temporal digitized data is cached in computer memory in doubly linked circular lists to avoid the possible data loss by the occasional temporal storage or transfer jam. These data are in turn archived in MDSplus format by using slice storage mechanism called “segments”. For the quick access of the archived data to the users, multiple data servers are used. These data servers are linked using LVS (Linux Virtual server) load balance technology to provide a safe, highly scalable and available data service

  18. A seasonal agricultural drought forecast system for food-insecure regions of East Africa

    Science.gov (United States)

    Shukla, Shraddhanand; McNally, Amy; Husak, Gregory; Funk, Christopher C.

    2014-01-01

     The increasing food and water demands of East Africa's growing population are stressing the region's inconsistent water resources and rain-fed agriculture. More accurate seasonal agricultural drought forecasts for this region can inform better water and agricultural management decisions, support optimal allocation of the region's water resources, and mitigate socio-economic losses incurred by droughts and floods. Here we describe the development and implementation of a seasonal agricultural drought forecast system for East Africa (EA) that provides decision support for the Famine Early Warning Systems Network's science team. We evaluate this forecast system for a region of equatorial EA (2° S to 8° N, and 36° to 46° E) for the March-April-May growing season. This domain encompasses one of the most food insecure, climatically variable and socio-economically vulnerable regions in EA, and potentially the world: this region has experienced famine as recently as 2011. To assess the agricultural outlook for the upcoming season our forecast system simulates soil moisture (SM) scenarios using the Variable Infiltration Capacity (VIC) hydrologic model forced with climate scenarios for the upcoming season. First, to show that the VIC model is appropriate for this application we forced the model with high quality atmospheric observations and found that the resulting SM values were consistent with the Food and Agriculture Organization's (FAO's) Water Requirement Satisfaction Index (WRSI), an index used by FEWS NET to estimate crop yields. Next we tested our forecasting system with hindcast runs (1993–2012). We found that initializing SM forecasts with start-of-season (5 March) SM conditions resulted in useful SM forecast skill (> 0.5 correlation) at 1-month, and in some cases at 3 month lead times. Similarly, when the forecast was initialized with mid-season (i.e. 5 April) SM conditions the skill until the end-of-season improved. This shows that early-season rainfall

  19. Preliminary assessment report for Grubbs/Kyle Training Center, Smyrna/Rutherford County Regional Airport, Installation 47340, Smyrna, Tennessee. Installation Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Dennis, C.; Stefano, J.

    1993-07-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Tennessee Army National Guard (TNARNG) property near Smyrna, Tennessee. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Grubbs/Kyle Training Center property, the requirement of the Department of Defense Installation Restoration Program.

  20. Productivity, Performance and Return on Investment: A Baseline Analysis of Tennessee Public Institutions of Higher Education

    Science.gov (United States)

    Tennessee Higher Education Commission, 2010

    2010-01-01

    Tennessee needs to continuously increase its degree productivity by four percent every year from now until 2025. In the midst of this need for increased degree production, the state's current economic realities indicate public institutions will receive little to no new state appropriated revenues for the foreseeable future. The Master Plan Annual…

  1. Peculiarities of transformation processes in East Germany

    Directory of Open Access Journals (Sweden)

    Marion Dathe

    2011-03-01

    Full Text Available The process of socio-economic transformation of East German lands after the German reunification in 1990 is analyzed, the term "transformation" in frames of planned and market economies is defined. The author studies the historical determinants of the transformation process in Germany. German economic and industrial history in context of the driving forces and their social values, as well as the properties of the planning and economic systems that underlie the transformation of East German mentality, are considered. Further analysis is connected with economic, social and political components of the East German transformation process, "the dominance of the West", the collapse of the Council for Mutual Economic Assistance, privatization etc. Finally, the outcome of already traversed path of transformation of East Germany is considered. It is concluded, that the transformation process is not only historically conditioned situations of both the merging parties in the case of Germany, but also the positive or negative perception of its results and the motivation for its further implementation.

  2. An Assessment of health risk associated with mercury in soil and sediment from East Fork Poplar Creek, Oak Ridge, Tennessee. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Revis, N.; Holdsworth, G.; Bingham, G.; King, A.; Elmore, J.

    1989-04-01

    This report presents results from a study conducted to determine the toxicity of Mercury in soils sediments samples. Mice were fed via diet, soils and sediment, from various locations along the East Fork Poplar creek. Tissue distribution of pollutants was determined at various intervals. The tissue level relative to toxicity was used to determine the effect of a complex matrix on the gastrointestinal absorption and tissue distribution of the pollutants (other pollutants included cadmium and selenium).

  3. Vitamin D deficiency: A potential risk factor for Clostridium difficile infection

    OpenAIRE

    Youssef, Dima; Grant, William B; Peiris, Alan N

    2012-01-01

    Dima Youssef,1 William B Grant,2 Alan N Peiris3,41Department of Internal Medicine, Division of Infectious Diseases, 2Sunlight, Nutrition and Health Research Center, San Francisco, CA USA; 3Department of Medicine, Mountain Home VAMC, 4Department of Medicine, East Tennessee State University, Johnson City, Tennessee, USAIn the July 3, 2012 issue of the journal of Risk Management and Healthcare Policy, Martinez et al present a nice review on Clostridium difficile (C. difficile) infections.1 The d...

  4. Calendar Year 2007 Resource Conservation and Recovery Act Annual Monitoring Report for the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee - RCRA Post-Closure Permit Nos. TNHW-113, TNHW-116, and TNHW-128

    Energy Technology Data Exchange (ETDEWEB)

    Elvado Environmental

    2008-02-01

    This report contains groundwater quality monitoring data obtained during calendar year (CY) 2007 at the following hazardous waste treatment, storage, and disposal (TSD) units located at the US Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee; this S-3 Site, Oil Landfarm, Bear Creek Burial Grounds/Walk-In Pits (BCBG/WIP), Eastern S-3 Site Plume, Chestnut Ridge Security Pits (CRSP), Chestnut Ridge Sediment Disposal Baste (CRSDB), few Hollow Quarry (KHQ), and East Chestnut Ridge Waste Pile (ECRWP). Hit monitoring data were obtained in accordance with the applicable Resource Conservation and Recovery Act of 1976 (RCRA) hazardous waste post-closure permit (PCP). The Tennessee Department of Environment and Conservation (TDEC) - Division of Solid Waste Management issued the PCPs to define the requirements for RCRA post-closure inspection, maintenance, and groundwater monitoring at the specified TSD units located within the Bear Creek Hydrogeologic Regime (PCP no. TNHW-116), Upper East Fork Poplar Creek Hydrogeologic Regime (PCP no. TNHW-113), and Chestnut Ridge Hydrogeologic Regime (PCP no. TNHW-128). Each PCP requires the Submittal of an annual RCRA groundwater monitoring report containing the groundwater sampling information and analytical results obtained at each applicable TSD unit during the preceding CY, along with an evaluation of groundwater low rates and directions and the analytical results for specified RCRA groundwater target compounds; this report is the RCRA annual groundwater monitoring report for CY 2007. The RCRA post-closure groundwater monitoring requirements specified in the above-referenced PCP for the Chestnut Ridge Regime replace those defined in the previous PCP (permit no. TNHW-088), which expired on September 18, 2005, but remained effective until the TDEC issued the new PCP in September 2006. The new PCP defines site-specific groundwater sampling and analysis requirements for the

  5. Analysis and optimization on in-vessel inspection robotic system for EAST

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Weijun, E-mail: zhangweijun@sjtu.edu.cn; Zhou, Zeyu; Yuan, Jianjun; Du, Liang; Mao, Ziming

    2015-12-15

    Since China has successfully built her first Experimental Advanced Superconducting TOKAMAK (EAST) several years ago, great interest and demand have been increasing in robotic in-vessel inspection/operation systems, by which an observation of in-vessel physical phenomenon, collection of visual information, 3D mapping and localization, even maintenance are to be possible. However, it has been raising many challenges to implement a practical and robust robotic system, due to a lot of complex constraints and expectations, e.g., high remanent working temperature (100 °C) and vacuum (10{sup −3} pa) environment even in the rest interval between plasma discharge experiments, close-up and precise inspection, operation efficiency, besides a general kinematic requirement of D shape irregular vessel. In this paper we propose an upgraded robotic system with redundant degrees of freedom (DOF) manipulator combined with a binocular vision system at the tip and a virtual reality system. A comprehensive comparison and discussion are given on the necessity and main function of the binocular vision system, path planning for inspection, fast localization, inspection efficiency and success rate in time, optimization of kinematic configuration, and the possibility of underactuated mechanism. A detailed design, implementation, and experiments of the binocular vision system together with the recent development progress of the whole robotic system are reported in the later part of the paper, while, future work and expectation are described in the end.

  6. Implementation plan for liquid low-level radioactive waste tank systems for fiscal year 1995 at Oak Ridge National Laboratory under the Federal Facility Agreement, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-06-01

    This document is the third annual revision of the plans and schedules for implementing the Federal Facility Agreement (FFA) compliance program, originally submitted in 1992 as ES/ER-17 ampersand D1, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. This document summarizes the progress that has been made to date in implementing the plans and schedules for meeting the FFA commitments for the Liquid Low-Level Waste (LLLW) System at Oak Ridge National Laboratory (ORNL). Information presented in this document provides a comprehensive summary to facilitate understanding of the FFA compliance program for LLLW tank systems and to present plans and schedules associated with remediation, through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process, of LLLW tank systems that have been removed from service. ORNL has a comprehensive program underway to upgrade the LLLW System as necessary to meet the FFA requirements. The tank systems that are removed from service are being investigated and remediated through the CERCLA process. Waste and risk characterizations have been submitted. Additional data will be prepared and submitted to EPA/TDEC as tanks are taken out of service and as required by the remedial investigation/feasibility study (RI/FS) process. Chapter 1 provides general background information and philosophies that led to the plans and schedules that appear in Chaps. 2 through 5

  7. Production-scale LLW and RMW solidification system operational testing at Argonne National Laboratory-East (ANL-E)

    International Nuclear Information System (INIS)

    Wescott, J.; Wagh, A.; Singh, D.; Nelson, R.; No, H.

    1997-01-01

    Argonne National Laboratory-East (ANL-E) has begun production-scale testing of a low-level waste and radioactive mixed waste solidification system. This system will be used to treat low-level and mixed radioactive waste to meet land burial requirements. The system can use any of several types of solidification media, including a chemically bonded phosphate ceramic developed by ANL-E scientists. The final waste product will consist of a solidified mass in a standard 208-liter drum. The system uses commercial equipment and incorporates several unique process control features to ensure proper treatment. This paper will discuss the waste types requiring treatment, the system configuration, and operation results for these waste streams

  8. 75 FR 31836 - Tennessee Division: Notice To Rescind a Notice of Intent (NOI) to Prepare an Environmental Impact...

    Science.gov (United States)

    2010-06-04

    ... Improvements in Elizabethton, Carter County, TN AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... 508, Nashville, TN 37217. SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the Tennessee... approximately four miles. The purpose of the project is to improve traffic flow, travel time, and mobility...

  9. Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956)- An Assessment of Quantities released, Off-Site Radiation Doses, and Potential Excess Risks of Thyroid Cancer- APPENDICES Appendices-Volume 1A

    International Nuclear Information System (INIS)

    Apostoaei, A.I.; Burns, R.E.; Hoffman, F.O.; Ijaz, T.; Lewis, C.J.; Nair, S.K.; Widner, T.E.

    1999-01-01

    This report consists of all the appendices for the report described below: In the early 1990s, concern about the Oak Ridge Reservation's past releases of contaminants to the environment prompted Tennessee's public health officials to pursue an in-depth study of potential off-site health effects at Oak Ridge. This study, the Oak Ridge dose reconstruction, was supported by an agreement between the U.S. Department of Energy (DOE) and the State of Tennessee, and was overseen by a 12-member panel appointed by Tennessee's Commissioner of Health. One of the major contaminants studied in the dose reconstruction was radioactive iodine, which was released to the air by X-10 (now called Oak Ridge National Laboratory) as it processed spent nuclear reactor fuel from 1944 through 1956. The process recovered radioactive lanthanum for use in weapons development. Iodine concentrates in the thyroid gland so health concerns include various diseases of the thyroid, such as thyroid cancer. The large report, ''Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956) - An Assessment of Quantities Released, Off-site Radiation Doses, and Potential Excess Risks of Thyroid Cancer,'' is in two volumes. Volume 1 is the main body of the report, and Volume 1A, which has the same title, consists of 22 supporting appendices. Together, these reports serve the following purposes: (1) describe the methodologies used to estimate the amount of iodine-131 (I-131) released; (2) evaluate I-131's pathway from air to vegetation to food to humans; (3) estimate doses received by human thyroids; (4) estimate excess risk of acquiring a thyroid cancer during ones lifetime; and (5) provide equations, examples of historical documents used, and tables of calculated values as appendices. Results indicate that females born in 1952 who consumed milk from a goat pastured a few miles east of X-10 received the highest doses from I-131 and would have had the highest

  10. Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956)- An Assessment of Quantities released, Off-Site Radiation Doses, and Potential Excess Risks of Thyroid Cancer- APPENDICES Appendices-Volume 1A

    Energy Technology Data Exchange (ETDEWEB)

    Apostoaei, A.I.; Burns, R.E.; Hoffman, F.O.; Ijaz, T.; Lewis, C.J.; Nair, S.K.; Widner, T.E.

    1999-07-01

    This report consists of all the appendices for the report described below: In the early 1990s, concern about the Oak Ridge Reservation's past releases of contaminants to the environment prompted Tennessee's public health officials to pursue an in-depth study of potential off-site health effects at Oak Ridge. This study, the Oak Ridge dose reconstruction, was supported by an agreement between the U.S. Department of Energy (DOE) and the State of Tennessee, and was overseen by a 12-member panel appointed by Tennessee's Commissioner of Health. One of the major contaminants studied in the dose reconstruction was radioactive iodine, which was released to the air by X-10 (now called Oak Ridge National Laboratory) as it processed spent nuclear reactor fuel from 1944 through 1956. The process recovered radioactive lanthanum for use in weapons development. Iodine concentrates in the thyroid gland so health concerns include various diseases of the thyroid, such as thyroid cancer. The large report, ''Iodine-131 Releases from Radioactive Lanthanum Processing at the X-10 Site in Oak Ridge, Tennessee (1944-1956) - An Assessment of Quantities Released, Off-site Radiation Doses, and Potential Excess Risks of Thyroid Cancer,'' is in two volumes. Volume 1 is the main body of the report, and Volume 1A, which has the same title, consists of 22 supporting appendices. Together, these reports serve the following purposes: (1) describe the methodologies used to estimate the amount of iodine-131 (I-131) released; (2) evaluate I-131's pathway from air to vegetation to food to humans; (3) estimate doses received by human thyroids; (4) estimate excess risk of acquiring a thyroid cancer during ones lifetime; and (5) provide equations, examples of historical documents used, and tables of calculated values as appendices. Results indicate that females born in 1952 who consumed milk from a goat pastured a few miles east of X-10 received the highest doses from

  11. Analyzing the Implications of Climate Data on the Rainfall Frequency Spectrum: Case Study of Knoxville, Tennessee and Surrounding Region

    Energy Technology Data Exchange (ETDEWEB)

    Sylvester, Linda M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Omitaomu, Olufemi A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Parish, Esther S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-09-01

    Modeled daily precipitation values are used to determine changes in percentile rainfall event depths, for planning and mitigation of stormwater runoff, over past (1980-2005) and future (2025-2050) periods for Knoxville, Tennessee and the surrounding area.

  12. Federal Facility Agreement plans and schedules for liquid low-level radioactive waste tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-06-01

    The Superfund Amendments and Reauthorization Act of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires a Federal Facility Agreement (FFA) for federal facilities placed on the National Priorities List. The Oak Ridge Reservation was placed on that list on December 21, 1989, and the agreement was signed in November 1991 by the Department of Energy Oak Ridge Field Office (DOE-OR), the US Environmental Protection Agency (EPA)-Region IV, and the Tennessee Department of Environment and Conservation (TDEC). The effective date of the FFA was January 1, 1992. Section 9 and Appendix F of the agreement impose design and operating requirements on the Oak Ridge National Laboratory (ORNL) liquid low-level radioactive waste (LLLW) tank systems and identify several plans, schedules, and assessments that must be submitted to EPA/TDEC for review or approval. The initial issue of this document in March 1992 transmitted to EPA/TDEC those plans and schedules that were required within 60 to 90 days of the FFA effective date. The current revision of this document updates the plans, schedules, and strategy for achieving compliance with the FFA, and it summarizes the progress that has been made over the past year. Chapter 1 describes the history and operation of the ORNL LLLW System, the objectives of the FFA, the organization that has been established to bring the system into compliance, and the plans for achieving compliance. Chapters 2 through 7 of this report contain the updated plans and schedules for meeting FFA requirements. This document will continue to be periodically reassessed and refined to reflect newly developed information and progress

  13. The design of remote participation platform for EAST plasma control

    Energy Technology Data Exchange (ETDEWEB)

    Yuan, Q.P., E-mail: qpyuan@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Xiao, B.J. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); University of Science & Technology of China, Hefei (China); Zhang, R.R. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Chai, W.T.; Liu, J.; Xiao, R.; Zhou, Z.C.; Pei, X.F. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); University of Science & Technology of China, Hefei (China)

    2016-11-15

    Highlights: • The remote participation platform for EAST plasma control is composed of real time control service and scenario management. • The web based interface has been developed for supporting remote participation. • The functionality module has been designed and assistant tools have been developed. - Abstract: EAST has become a physics experimental platform for high parameter and steady-state long-pulse plasma operation. A new remote participation platform for EAST plasma control is designed, which is composed of gatekeeper system, web-based user interface system, discharge scenario management system, online simulation system and data interface with on-site plasma control system (PCS). The identification and access privilege of remote participator is validated by the gatekeeper system. Only authorized users can set control parameters for next shot plasma control or making discharge scenario for future shot through WebPCS which is a web-based user interface and designed based on B/S structure. The systematic architecture design and preliminary deployment of such remote platform will be presented in this paper.

  14. Treponemal disease in the middle Archaic to early Woodland periods of the western Tennessee River Valley.

    Science.gov (United States)

    Smith, Maria Ostendorf

    2006-10-01

    The high frequency of late prehistoric New World treponemal disease is attributable to the demographic changes concomitant with the adoption of agriculture. However, these demographic changes in group mobility and site density episodically preceded intensive plant domestication, suggesting possible staggered temporal change in observed treponemal disease case frequency. Thirteen convincing and an additional two probable (N = 581) cases of treponemal disease were identified in an eight-site skeletal sample spanning the Middle (6,000-3,000 BCE) to Late (2,500-ca. 1,000 to 500 BCE) Archaic and Early Woodland (500 BCE-0 CE) periods from the western Tennessee River Valley. Treponemal disease cases are infrequent in both the Middle (3/115, 2.6%) and Late (2 to 4 cases, subsistence economy across the Archaic-Woodland temporal boundary in the western Tennessee River Valley remained, as elsewhere, based on intensive hunting and collecting, the demographic corollaries of treponemal disease would apparently not be met. However, the traditional horizon marker of the Woodland period is the adoption of pottery, an activity associated with sedentism.

  15. Progress of the EAST project in China

    International Nuclear Information System (INIS)

    Wan, Y.X.; Wu, S.T.; Weng, P.D.; Li, J.G.; Gao, D.M.

    2005-01-01

    The Experimental Advanced Superconducting Tokamak (EAST) project is one of the National Mega-Projects of Science Research of China, which was approved by Chinese government in 1998. EAST is a full superconducting tokamak with an elongated plasma cross-section. The mission of the project is to widely investigate both of the physics and the technologies of advanced tokamak operations, especially the mechanism of power and particle handling for steady-state operations. The basic requirements for the EAST tokamak are full superconducting coils, suitable inductive current system, continuous working non-inductive current driven and heating systems, flexible operation scenarios, flexible J(r) and P(r) control, reliable and fast plasma positioning and shaping control, changeable plasma facing components, advanced divertor and diagnostics. Significant progress of the EAST project has been achieved during last two years. The R and D programs, mainly focused on the superconducting magnets, have processed successfully. The prototypes of main parts have been fabricated and qualified. Most of the key parts of the machine have been delivered to the assembly site. The assembly of the device has begun. It is planned to obtain the first plasma in 2005. The detail information of the testing results of superconducting magnets will be given in this paper. The assembly plan and the experimental plan will be introduced, too. (author)

  16. Interactive WebGL-based 3D visualizations for EAST experiment

    International Nuclear Information System (INIS)

    Xia, J.Y.; Xiao, B.J.; Li, Dan; Wang, K.R.

    2016-01-01

    Highlights: • Developing a user-friendly interface to visualize the EAST experimental data and the device is important to scientists and engineers. • The Web3D visualization system is based on HTML5 and WebGL, which runs without the need for plug-ins or third party components. • The interactive WebGL-based 3D visualization system is a web-portal integrating EAST 3D models, experimental data and plasma videos. • The original CAD model was discretized into different layers with different simplification to enable realistic rendering and improve performance. - Abstract: In recent years EAST (Experimental Advanced Superconducting Tokamak) experimental data are being shared and analyzed by an increasing number of international collaborators. Developing a user-friendly interface to visualize the data, meta data and the relevant parts of the device is becoming more and more important to aid scientists and engineers. Compared with the previous virtual EAST system based on VRML/Java3D [1] (Li et al., 2014), a new technology is being adopted to create a 3D visualization system based on HTML5 and WebGL, which runs without the need for plug-ins or third party components. The interactive WebGL-based 3D visualization system is a web-portal integrating EAST 3D models, experimental data and plasma videos. It offers a highly interactive interface allowing scientists to roam inside EAST device and view the complex 3-D structure of the machine. It includes technical details of the device and various diagnostic components, and provides visualization of diagnostic metadata with a direct link to each signal name and its stored data. In order for the quick access to the device 3D model, the original CAD model was discretized into different layers with different simplification. It allows users to search for plasma videos in any experiment and analyze the video frame by frame. In this paper, we present the implementation details to enable realistic rendering and improve performance.

  17. Interactive WebGL-based 3D visualizations for EAST experiment

    Energy Technology Data Exchange (ETDEWEB)

    Xia, J.Y., E-mail: jyxia@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); University of Science and Technology of China, Hefei, Anhui (China); Xiao, B.J. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); University of Science and Technology of China, Hefei, Anhui (China); Li, Dan [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); Wang, K.R. [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China); University of Science and Technology of China, Hefei, Anhui (China)

    2016-11-15

    Highlights: • Developing a user-friendly interface to visualize the EAST experimental data and the device is important to scientists and engineers. • The Web3D visualization system is based on HTML5 and WebGL, which runs without the need for plug-ins or third party components. • The interactive WebGL-based 3D visualization system is a web-portal integrating EAST 3D models, experimental data and plasma videos. • The original CAD model was discretized into different layers with different simplification to enable realistic rendering and improve performance. - Abstract: In recent years EAST (Experimental Advanced Superconducting Tokamak) experimental data are being shared and analyzed by an increasing number of international collaborators. Developing a user-friendly interface to visualize the data, meta data and the relevant parts of the device is becoming more and more important to aid scientists and engineers. Compared with the previous virtual EAST system based on VRML/Java3D [1] (Li et al., 2014), a new technology is being adopted to create a 3D visualization system based on HTML5 and WebGL, which runs without the need for plug-ins or third party components. The interactive WebGL-based 3D visualization system is a web-portal integrating EAST 3D models, experimental data and plasma videos. It offers a highly interactive interface allowing scientists to roam inside EAST device and view the complex 3-D structure of the machine. It includes technical details of the device and various diagnostic components, and provides visualization of diagnostic metadata with a direct link to each signal name and its stored data. In order for the quick access to the device 3D model, the original CAD model was discretized into different layers with different simplification. It allows users to search for plasma videos in any experiment and analyze the video frame by frame. In this paper, we present the implementation details to enable realistic rendering and improve performance.

  18. Final Report for EPSCoR Implementation Award DE-FG02-08ER46528 to University of Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Egami, Takeshi [Univ. of Tennessee, Knoxville, TN (United States)

    2015-12-15

    With the completion of the Spallation Neutron Source (SNS) and upgrading of the High-Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory (ORNL) the state of Tennessee now leads the world in the capability of neutron scattering research. This project aimed at directing the great impact of these facilities to researchers in the EPSCoR states, Tennessee in particular, by creating a research collaboration network around these facilities. The plan consisted of two parts: (1) Direct effort to increase the user base through the travel fellowship for graduate students and faculty from the EPSCoR states to use the neutron facilities at the ORNL, and through workshops and schools on the application of neutron scattering, and (2) Research collaboration among the core participants from UTK, ORNL and other states. The EPSCoR Travel Fellowship Program has supported over 300 distinct and 600 cumulative neutron facility users and over 250 workshop participants, with the total of nearly 600 distinct recipients. This program has been highly popular particularly among young faculty members who often have difficulty in raising travel funds, and enabled participation of young graduate students to neutron research. This program has been the foundation of this project. We supported several educational workshops, organized one (“neutrons for novice”) by ourselves each year, targeting non-users of neutron scattering. These efforts significantly contributed to expand the neutron user base among the EPSCoR states. The core research targeted condensed matter physics and soft matter sciences. The core research groups participating in this project include not only researchers from Tennessee but those from Kansas, South Carolina, Puerto Rico and Louisiana, making this project a national, rather than regional, enterprise. Collaborations that were seeded by this project have grown into two major projects, one in materials science (irradiation effects on high-entropy alloys) and

  19. Imagining School Autonomy in High-Performing Education Systems: East Asia as a Source of Policy Referencing in England

    Science.gov (United States)

    You, Yun; Morris, Paul

    2016-01-01

    Education reform is increasingly based on emulating the features of "world-class" systems that top international attainment surveys and, in England specifically, East Asia is referenced as the "inspiration" for their education reforms. However, the extent to which the features identified by the UK Government accord with the…

  20. 77 FR 31347 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Availability of the Environmental Assessment...

    Science.gov (United States)

    2012-05-25

    ... environmental assessment (EA) for the MPP Project, proposed by Tennessee Gas Pipeline Company, L.L.C. (TGP) in the above-referenced docket. TGP requests authorization to construct and operate 7.9 miles of looped... connection with its evaluation of TGP's Clean Water Act (Section 404) permit application for the MPP Project...

  1. Design and implementation of wormlike creeping mobile robot for EAST remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Qiang, E-mail: zhangqiang@iim.ac.cn [Institute of Intelligent Machines, Chinese Academy of Sciences, Hefei, Anhui 230031 (China); Department of Automation, University of Science and Technology of China, Hefei, Anhui 230026 (China); Zhou, Ling [Institute of Intelligent Machines, Chinese Academy of Sciences, Hefei, Anhui 230031 (China); Wang, Zengfu, E-mail: zfwang@ustc.edu.cn [Institute of Intelligent Machines, Chinese Academy of Sciences, Hefei, Anhui 230031 (China); Department of Automation, University of Science and Technology of China, Hefei, Anhui 230026 (China)

    2017-05-15

    Highlights: • Wormlike creeping robot walking on the V-shaped circular slot in EAST fusion vessel. • Mobile platform to carry equipments or assist manipulators for maintenance tasks. • Chain structure design with n(n ≥ 2) creeping units each of which has three segments. • Creeping gait planning to construct a multi-axis coordinating control scheme. • Evaluation and verification of basic motion performance and mechanical properties. - Abstract: Maintenance for nuclear fusion vessel is crucial, yet it faces great difficulty due to the complex internal physical and geometric conditions. Since the limitation on inherent strength, load, size, etc, a manipulator robot can only complete very limited tasks. Robotic arm systems for remote operation such as JET and MPD can carry certain tools to complete a variety of operating tasks, but it is difficult to achieve the system which is very complex. Therefore, if the inherent idea of using a single robot to complete the specified functions can change, it is possible to make the problems simpler and easier to solve by adding auxiliary robots working together with the robotic arm systems to complete the assigned tasks. Under the above background, based on the deeply analyzing and refining the functional requirements of the vessel operation robot, proceeding from the perspective of ability to move and carry a certain operating device, this paper presents a wormlike creeping mobile robot walking on the V-shaped circular slot inside a nuclear fusion vessel such as EAST (Experimental Advanced Superconducting Tokamak). We have designed and implemented the principle prototype of the robot which has chain structure with n (n ≥2) creeping units. Each creeping unit is of three-part structure, which consists of fore segment, mid segment and back segment connected by bidirectional universal joint. The fore and back segments stretch the paws to contact the surface of V-shaped slot, while the mid segment realizes the overall

  2. Design and implementation of wormlike creeping mobile robot for EAST remote maintenance system

    International Nuclear Information System (INIS)

    Zhang, Qiang; Zhou, Ling; Wang, Zengfu

    2017-01-01

    Highlights: • Wormlike creeping robot walking on the V-shaped circular slot in EAST fusion vessel. • Mobile platform to carry equipments or assist manipulators for maintenance tasks. • Chain structure design with n(n ≥ 2) creeping units each of which has three segments. • Creeping gait planning to construct a multi-axis coordinating control scheme. • Evaluation and verification of basic motion performance and mechanical properties. - Abstract: Maintenance for nuclear fusion vessel is crucial, yet it faces great difficulty due to the complex internal physical and geometric conditions. Since the limitation on inherent strength, load, size, etc, a manipulator robot can only complete very limited tasks. Robotic arm systems for remote operation such as JET and MPD can carry certain tools to complete a variety of operating tasks, but it is difficult to achieve the system which is very complex. Therefore, if the inherent idea of using a single robot to complete the specified functions can change, it is possible to make the problems simpler and easier to solve by adding auxiliary robots working together with the robotic arm systems to complete the assigned tasks. Under the above background, based on the deeply analyzing and refining the functional requirements of the vessel operation robot, proceeding from the perspective of ability to move and carry a certain operating device, this paper presents a wormlike creeping mobile robot walking on the V-shaped circular slot inside a nuclear fusion vessel such as EAST (Experimental Advanced Superconducting Tokamak). We have designed and implemented the principle prototype of the robot which has chain structure with n (n ≥2) creeping units. Each creeping unit is of three-part structure, which consists of fore segment, mid segment and back segment connected by bidirectional universal joint. The fore and back segments stretch the paws to contact the surface of V-shaped slot, while the mid segment realizes the overall

  3. Overview of EAST progress and near future plan

    International Nuclear Information System (INIS)

    Gong, X.; Li, J.; Wan, B.N.; Qian, J.P.; Cao, L.

    2015-01-01

    Full text of publication follows. The Experimental Advanced Superconducting Tokamak (EAST) is a fully superconducting tokamak with a flexible poloidal field system to accommodate both single null (SN) and double null (DN) divertor configurations, and its main mission is to establish steady-state high performance plasma and study related physics and technologies. Significant progress has recently been made on EAST with the following key issues. Developments of PFMs and improvements of the actively water-cooled PFCs and other in-vessel components, such as VS coils and diagnostics, have been carried out in the past few years to have the highest priority suitable for long pulse operation. Large pumping capacity (inner cryo-pump) and a new CW Pellet Injection system and Supersonic Molecule Beam Injection (SMBI) system to enhance fueling efficiency for particle control have been validated. ICRH and LHCD systems have been upgraded to a total power of 8 MW. Integrated operation scenarios (plasma startup, and ramp up/down) with advanced Plasma Control are focused on superconducting tokamak to avoid the huge thermal energy impact on the first wall. With these newly augmented capabilities, EAST have demonstrated long pulse divertor plasma up to 411 s, fully driven by LHCD of 1.0 MW, and further extended long pulse H-modes over 30 s with LHCD and ICRH, much longer than several tens of the current diffusion time. When LHCD is applied to the H-mode plasmas with ICRH, strong mitigation of ELMs has been observed due to the formation of Helical Current Filaments (HCFs) flowing along field lines in the SOL induced by LHCD. Highly efficient ELM pacing is demonstrated by using innovative Li pellet injection. ELMs mitigation with multi-pulse of SMBI also has been demonstrated in EAST in quasi-steady state over current diffusion time. Several experiments have addressed the importance of zonal flow and zonal flow-driven limit-cycle oscillations in H-mode physics. A new small-ELM regime

  4. Late Pleistocene fishes of the Tennessee River Basin: an analysis of a late Pleistocene freshwater fish fauna from Bell Cave (site ACb-2) in Colbert County, Alabama, USA

    OpenAIRE

    Stephen J. Jacquemin; Jun A. Ebersole; William C. Dickinson; Charles N. Ciampaglio

    2016-01-01

    The Tennessee River Basin is considered one of the most important regions for freshwater biodiversity anywhere on the globe. The Tennessee River Basin currently includes populations of at least half of the described contemporary diversity of extant North American freshwater fishes, crayfish, mussel, and gastropod species. However, comparatively little is known about the biodiversity of this basin from the Pleistocene Epoch, particularly the late Pleistocene (?10,000 to 30,000 years B.P.) lead...

  5. Tiger team assessment of the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    none,

    1990-02-01

    This document contains findings identified during the Tiger Team Compliance Assessment of the Department of Energy's (DOE's) Y-12 Plant in Oak Ridge, Tennessee. The Y-12 Plant Tiger Team Compliance Assessment is comprehensive in scope. It covers the Environmental, Safety, and Health (including Occupational Safety and Health Administration (OSHA) compliance), and Management areas and determines the plant's compliance with applicable federal (including DOE), state, and local regulations and requirements. 4 figs., 12 tabs.

  6. Economic impact analysis of energy facilities with particular reference to the Hartsville, Tennessee, area

    International Nuclear Information System (INIS)

    Isard, W.; Reiner, T.A.; Van Zele, R.

    1979-05-01

    The study focuses on the economic impacts of construction of the Hartsville, Tennessee, nuclear power plant. Four reactor units are now under construction. Investigated are the consequences likely to be felt in a six-county region, including the site and the city of Nashville. Estimates were made by applying to the construction and operating requirements of the plant an economic multiplier which yields an estimate of the induced and indirect effects of the power plant

  7. Tennessee Public Infrastructure Needs Inventory Assessment for FY 1998. A Commission Report to the 101st General Assembly.

    Science.gov (United States)

    Green, Harry A.; Norman, John F, .; McClure, C. Bennett, II

    This report represents the first effort by any public or private agency or organization to provide a comprehensive assessment of Tennessee's public infrastructure needs. Hundreds of local government officials and private citizens contributed information to this research. The main participants in the infrastructure inventory were the local…

  8. 16th East-European Conference on Advances in Databases and Information Systems (ADBIS 2012)

    CERN Document Server

    Härder, Theo; Wrembel, Robert; Advances in Databases and Information Systems

    2013-01-01

    This volume is the second one of the 16th East-European Conference on Advances in Databases and Information Systems (ADBIS 2012), held on September 18-21, 2012, in Poznań, Poland. The first one has been published in the LNCS series.   This volume includes 27 research contributions, selected out of 90. The contributions cover a wide spectrum of topics in the database and information systems field, including: database foundation and theory, data modeling and database design, business process modeling, query optimization in relational and object databases, materialized view selection algorithms, index data structures, distributed systems, system and data integration, semi-structured data and databases, semantic data management, information retrieval, data mining techniques, data stream processing, trust and reputation in the Internet, and social networks. Thus, the content of this volume covers the research areas from fundamentals of databases, through still hot topic research problems (e.g., data mining, XML ...

  9. 75 FR 64303 - Tennessee Gas Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the...

    Science.gov (United States)

    2010-10-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10-23-000] Tennessee Gas Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned Northeast Upgrade Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings October 8, 2010. The staff of the Federal Energy...

  10. Seismicity of the Earth 1900-2013 East African Rift

    Science.gov (United States)

    Hayes, Gavin P.; Jones, Eric S.; Stadler, Timothy J.; Barnhart, William D.; McNamara, Daniel E.; Benz, Harley M.; Furlong, Kevin P.; Villaseñor, Antonio; Hayes, Gavin P.; Jones, Eric S.; Stadler, Timothy J.; Barnhart, William D.; McNamara, Daniel E.; Benz, Harley M.; Furlong, Kevin P.; Villaseñor, Antonio

    2014-01-01

    The East African Rift system (EARS) is a 3,000-km-long Cenozoic age continental rift extending from the Afar triple junction, between the horn of Africa and the Middle East, to western Mozambique. Sectors of active extension occur from the Indian Ocean, west to Botswana and the Democratic Republic of the Congo (DRC). It is the only rift system in the world that is active on a continent-wide scale, providing geologists with a view of how continental rifts develop over time into oceanic spreading centers like the Mid-Atlantic Ridge.

  11. The uses of ERTS-1 imagery in the analysis of landscape change. [agriculture, strip mining forests, urban-suburban growth, and flooding in Tennessee, Kentucky, Mississippi, and Alabama

    Science.gov (United States)

    Rehder, J. B. (Principal Investigator)

    1974-01-01

    The author has identified the following significant results. The analysis of strip mining from ERTS-1 data has resulted in the mapping of landscape changes for the Cumberland Plateau Test Site. Several mapping experiments utilizing ERTS-1 data have been established for the mapping of state-wide land use regions. The first incorporates 12 frames of ERTS-1 imagery for the generalized thematic mapping of forest cover for the state of Tennessee. In another mapping effort, 14 ERTS-1 images have been analyzed for plowed ground signatures to produce a map of agricultural regions for Tennessee, Kentucky, and the northern portions of Mississippi and Alabama. Generalized urban land use categories and transportation networks have been determined from ERTS-1 imagery for the Knoxville Test Site. Finally, through the analysis of ERTS-1 imagery, short-lived phenomena such as the 1973 spring floods on the Mississippi River in western Tennessee, have been detected, monitored, and mapped.

  12. Tennessee's In-state Vulnerability Assessment for a "Rapid Dissemination of Human Immunodeficiency Virus or Hepatitis C Virus Infection" Event Utilizing Data About the Opioid Epidemic.

    Science.gov (United States)

    Rickles, Michael; Rebeiro, Peter F; Sizemore, Lindsey; Juarez, Paul; Mutter, Mitchell; Wester, Carolyn; McPheeters, Melissa

    2018-05-17

    Knowing which factors contribute to county-level vulnerability to a human immunodeficiency virus (HIV)/hepatitis C virus (HCV) outbreak, and which counties are most vulnerable, guides public health and clinical interventions. We therefore examined the impact of locally available indicators related to the opioid epidemic on prior national models of HIV/HCV outbreak vulnerability. Tennessee's 95 counties were the study sample. Predictors from 2012 and 2013 were used, mirroring prior methodology from the US Centers for Disease Control and Prevention (CDC). Acute HCV incidence was the proxy measure of county-level vulnerability. Seventy-eight predictors were identified as potentially predictive for HIV/HCV vulnerability. We used multiple dimension reduction techniques to determine predictors for inclusion and Poisson regression to generate a composite index score ranking county-level vulnerability for HIV/HCV. There was overlap of high-risk counties with the national analysis (25 of 41 counties). The distribution of vulnerability reinforces earlier research indicating that eastern Tennessee is at particularly high risk but also demonstrates that the entire state has high vulnerability. Prior research placed Tennessee among the top states for opioid prescribing, acute HCV infection, and greatest risk for an HIV/HCV outbreak. Given this confluence of risk, the Tennessee Department of Health expanded upon prior work to include more granular, local data, including on opioid prescribing. We also explored nonfatal and fatal overdoses. The more complete statewide view of risk generated, not only in eastern counties but also in the western corridor, will enable local officials to monitor vulnerability and better target resources.

  13. Work plan for the removal and subsequent management of specific waste from David Witherspoon, Inc., Knoxville, Tennessee

    International Nuclear Information System (INIS)

    1993-01-01

    The Tennessee Department of Environment and Conservation (TDEC) and the Department of Energy (DOE) have made the determination that approximately 258 drums of waste and 10 open-top boxes of waste now located at the site known as David Witherspoon, Inc., (DWI) in south Knoxville, Tennessee, should be repackaged as necessary and transferred to the K-25 Site in Oak Ridge, Tennessee, for management. This work plan addresses the four phases of activity planned and the methods of accomplishment The lint phase will consist of an assessment to determine requirements for managing the waste. Items to be investigated include site access, site conditions, personal protective equipment, waste characterization needs, packaging and labeling, transportation, receipt and storage of the waste at the K-25 Site, and site controls and monitoring required during the packaging operations to be conducted at DWI. The second phase will include mobilization of on-site support and operating facilities, sampling and transferral of a randomly selected representative fraction of the 232 drums now stored on-site in sea/land containers to storage facilities at the K-25 Site, and sampling of the waste now stored in the 26 drums inside the main process building and the 10 open-top boxes of waste stored outside and adjacent to the building. The third phase will include repackaging and transferral of the 26 drums and 10 boxes of waste to the K-25 Site and placement of the containerized waste into appropriate storage at the K-25 Site. Participants in the fourth phase of activity will demobilize the support and operating facilities from DWI, conduct an on-site evaluation at the K-25 site to verify compliance with storage and other management requirements, prepare a closeout report for the activity assessing the actions, and develop a plan for the final management method for the waste

  14. Computer vision system R&D for EAST Articulated Maintenance Arm robot

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Linglong, E-mail: linglonglin@ipp.ac.cn; Song, Yuntao, E-mail: songyt@ipp.ac.cn; Yang, Yang, E-mail: yangy@ipp.ac.cn; Feng, Hansheng, E-mail: hsfeng@ipp.ac.cn; Cheng, Yong, E-mail: chengyong@ipp.ac.cn; Pan, Hongtao, E-mail: panht@ipp.ac.cn

    2015-11-15

    Highlights: • We discussed the image preprocessing, object detection and pose estimation algorithms under poor light condition of inner vessel of EAST tokamak. • The main pipeline, including contours detection, contours filter, MER extracted, object location and pose estimation, was carried out in detail. • The technical issues encountered during the research were discussed. - Abstract: Experimental Advanced Superconducting Tokamak (EAST) is the first full superconducting tokamak device which was constructed at Institute of Plasma Physics Chinese Academy of Sciences (ASIPP). The EAST Articulated Maintenance Arm (EAMA) robot provides the means of the in-vessel maintenance such as inspection and picking up the fragments of first wall. This paper presents a method to identify and locate the fragments semi-automatically by using the computer vision. The use of computer vision in identification and location faces some difficult challenges such as shadows, poor contrast, low illumination level, less texture and so on. The method developed in this paper enables credible identification of objects with shadows through invariant image and edge detection. The proposed algorithms are validated through our ASIPP robotics and computer vision platform (ARVP). The results show that the method can provide a 3D pose with reference to robot base so that objects with different shapes and size can be picked up successfully.

  15. River restoration strategies in channelized, low-gradient landscapes of West Tennessee, USA

    Science.gov (United States)

    Smith, D.P.; Diehl, T.H.; Turrini-Smith, L. A.; Maas-Baldwin, J.; Croyle, Z.

    2009-01-01

    West Tennessee has a complex history of watershed disturbance, including agricultural erosion, channelization, accelerated valley sedimentation, and the removal and reestablishment of beaver. Watershed management has evolved from fl oodplain drainage via pervasive channelization to include local drainage canal maintenance and local river restoration. Many unmaintained canals are undergoing excessive aggradation and complex channel evolution driven by upland erosion and low valley gradient. The locus of aggradation in fully occluded canals (valley plugs) moves up-valley as sediment continues to accumulate in the backwater behind the plug. Valley plugs that cause canal avulsion can lead to redevelopment of meandering channels in less disturbed areas of the fl oodplain, in a process of passive self-restoration. Some valley plugs have brought restored fl oodplain function, reoccupation of extant historic river channels, and formation of a "sediment shadow" that protects downstream reaches from excess sedimentation. Despite the presence of numerous opportunities, there is presently no mechanism for including valley plugs in mitigation projects. In 1997 a survey of 14 reference reach cross sections documented relations between drainage area and bankfull geometry of relatively unmodified streams in West Tennessee. Reassessment of seven of those sites in 2007 showed that one had been dammed by beaver and that two sites could not be analyzed further because of signifi cant vertical or lateral instability. In contrast to other regions of North America, the results suggest that stream channels in this region fl ood more frequently than once each year, and can remain out of banks for several weeks each year. ?? 2009 Geological Society of America.

  16. Risk characterization data manual for Category D inactive liquid low-level waste tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-04-01

    This manual reports the results of a risk characterization of Category D inactive liquid low-level radioactive waste (LLLW) at the Oak Ridge National Laboratory (ORNL). The risk characterization is required by the Federal Facility Agreement between the Department of Energy-Oak Ridge Operations Office, the Environmental Protection Agency-Region IV, and the Tennessee Department of Environment and Conservation. The intent of the risk characterization is to determine relative priorities for assessment and remediation. When the scores for all tanks had been weighted and summed, the tanks were ranked in descending order on the basis of their total scores. The highest possible score for a tank is 30. The descending order represents the recommended priorities for evaluation: the higher the score, the higher the priority for evaluation

  17. Closure certification report for the Bear Creek burial grounds B area and walk-in pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-06-01

    On July 5, 1993, the revised RCRA Closure Plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, DOE/OR/01-1100 ampersand D3 and Y/ER-53 ampersand D3, was approved by the Tennessee Department of Environment and Conservation (TDEC). The closure activities described in that closure plan have been performed. The purpose of this document is to summarize the closure activities for B Area and Walk-In Pits (WIPs), including placement of the Kerr Hollow Quarry debris at the WIPs

  18. Evaluation of protected, threatened, and endangered fish species in Upper Bear Creek watershed

    International Nuclear Information System (INIS)

    Ryon, M.G.

    1998-07-01

    The East Bear Creek Site for the proposed centralized waste facility on the US Department of Energy's Oak Ridge Reservation was evaluated for potential rare, threatened or endangered (T and E) fish species in the six primary tributaries and the main stem of Bear Creek that are within or adjacent to the facility footprint. These tributaries and portion of Bear Creek comprise the upper Bear Creek watershed. One T and E fish species, the Tennessee dace (Phoxinus tennesseensis), was located in these streams. The Tennessee dace is listed by the State of Tennessee as being in need of management, and as such its habitat is afforded some protection. Surveys indicated that Tennessee dace occupy the northern tributaries NT-1, NT-4, and NT-5, as well as Bear Creek. Several specimens of the dace were gravid females, indicating that the streams may function as reproductive habitat for the species. The implications of impacts on the species are discussed and mitigation objectives are included

  19. 77 FR 27048 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Intent To Prepare an Environmental Assessment...

    Science.gov (United States)

    2012-05-08

    ... facilities by Tennessee Gas Pipeline Company, L.L.C. (TGP) in Lafourche Parish, Louisiana. The Commission... proposed project and encourage them to comment on their areas of concern. TGP provided landowners with a... the FERC Web site ( www.ferc.gov ). Summary of the Proposed Project TGP proposes to abandon in place...

  20. Disarmament and security measures in South-East Asia

    International Nuclear Information System (INIS)

    Hasmy Bin Agam

    1992-01-01

    The situation in South-East Asia is something of a paradox wrought by the end of the cold war and super Power rivalry. As a subregion and integral part of the great Pacific region in cannot be considered in isolation. On the other hand South-East Asia is one of great complexity in terms of its history, peoples and cultures, as well as in its political social and economic systems and orientation. Security picture in South-east Asia in the coming decades depends on a number of impoderables, mainly the situation in Indochina, notably Cambodia, the kind of relationship that will develop between the ASEAN member states and the Indochina countries, as well as with China, as nuclear owning regional Power