WorldWideScience

Sample records for system assessment document

  1. Document Level Assessment of Document Retrieval Systems in a Pairwise System Evaluation

    Science.gov (United States)

    Rajagopal, Prabha; Ravana, Sri Devi

    2017-01-01

    Introduction: The use of averaged topic-level scores can result in the loss of valuable data and can cause misinterpretation of the effectiveness of system performance. This study aims to use the scores of each document to evaluate document retrieval systems in a pairwise system evaluation. Method: The chosen evaluation metrics are document-level…

  2. Social Work Assessment Notes: A Comprehensive Outcomes-Based Hospice Documentation System.

    Science.gov (United States)

    Hansen, Angela Gregory; Martin, Ellen; Jones, Barbara L; Pomeroy, Elizabeth C

    2015-08-01

    This article describes the development of an integrated psychosocial patient and caregiver assessment and plan of care for hospice social work documentation. A team of hospice social workers developed the Social Work Assessment Notes as a quality improvement project in collaboration with the information technology department. Using the Social Work Assessment Tool as an organizing framework, this comprehensive hospice social work documentation system is designed to integrate assessment, planning, and outcomes measurement. The system was developed to guide the assessment of patients' and caregivers' needs related to end-of-life psychosocial issues, to facilitate collaborative care plan development, and to measure patient- and family-centered outcomes. Goals established with the patient and the caregiver are documented in the plan of care and become the foundation for patient-centered, strengths-based interventions. Likert scales are used to assign numerical severity levels for identified issues and progress made toward goals and to track the outcome of social work interventions across nine psychosocial constructs. The documentation system was developed for use in an electronic health record but can be used for paper charting. Future plans include automated aggregate outcomes measurement to identify the most effective interventions and best practices in end-of-life care.

  3. [Quality management and strategic consequences of assessing documentation and coding under the German Diagnostic Related Groups system].

    Science.gov (United States)

    Schnabel, M; Mann, D; Efe, T; Schrappe, M; V Garrel, T; Gotzen, L; Schaeg, M

    2004-10-01

    The introduction of the German Diagnostic Related Groups (D-DRG) system requires redesigning administrative patient management strategies. Wrong coding leads to inaccurate grouping and endangers the reimbursement of treatment costs. This situation emphasizes the roles of documentation and coding as factors of economical success. The aims of this study were to assess the quantity and quality of initial documentation and coding (ICD-10 and OPS-301) and find operative strategies to improve efficiency and strategic means to ensure optimal documentation and coding quality. In a prospective study, documentation and coding quality were evaluated in a standardized way by weekly assessment. Clinical data from 1385 inpatients were processed for initial correctness and quality of documentation and coding. Principal diagnoses were found to be accurate in 82.7% of cases, inexact in 7.1%, and wrong in 10.1%. Effects on financial returns occurred in 16%. Based on these findings, an optimized, interdisciplinary, and multiprofessional workflow on medical documentation, coding, and data control was developed. Workflow incorporating regular assessment of documentation and coding quality is required by the DRG system to ensure efficient accounting of hospital services. Interdisciplinary and multiprofessional cooperation is recognized to be an important factor in establishing an efficient workflow in medical documentation and coding.

  4. Method for assessing software reliability of the document management system using the RFID technology

    Directory of Open Access Journals (Sweden)

    Kiedrowicz Maciej

    2016-01-01

    Full Text Available The deliberations presented in this study refer to the method for assessing software reliability of the docu-ment management system, using the RFID technology. A method for determining the reliability structure of the dis-cussed software, understood as the index vector for assessing reliability of its components, was proposed. The model of the analyzed software is the control transfer graph, in which the probability of activating individual components during the system's operation results from the so-called operational profile, which characterizes the actual working environment. The reliability structure is established as a result of the solution of a specific mathematical software task. The knowledge of the reliability structure of the software makes it possible to properly plan the time and finan-cial expenses necessary to build the software, which would meet the reliability requirements. The application of the presented method is illustrated by the number example, corresponding to the software reality of the RFID document management system.

  5. Documentation of torture victims, assessment of the start procedure for medico-legal documentation.

    Science.gov (United States)

    Mandel, Lene; Worm, Lise

    2007-01-01

    A Pilot Study was performed at the Rehabilitation and Research Centre for Torture Victims (RCT) in Copenhagen in order to explore the possibilities for adding a medico-legal documentation component to the rehabilitation of torture victims already taking place. It describes the process and results on implementing medico-legal documentation in a rehabilitative setting. A modified version of the Guidelines in the Istanbul Protocol was developed on the basis of the review of literature and current practices described in "Documentation of torture victims, implementation of medico-legal protocols". The modified guidelines were tested on five clients. The aim was twofold: 1) To assess the client's attitude towards the idea of adding a documentation component to the rehabilitation process and: 2) To assess the practical circumstances of implementing the Istanbul Protocol in the everyday life of a rehabilitation centre. Results show that all five clients were positive towards the project and found comfort in being able to contribute to the fight against impunity. Also, the Pilot Study demonstrated that a large part of the medico-legal documentation was already obtained in the rehabilitation process. It was however not accessible due to lack of systematization and a data registering system. There are thus important synergies in collecting data for rehabilitation and documentation but a joint database system is necessary to realize these synergies.

  6. READS: the rapid electronic assessment documentation system.

    LENUS (Irish Health Repository)

    Hickey, Ann

    2012-12-13

    Patient documentation is time consuming and can detract from care. The authors report a novel computer programme that manipulates routinely collected information to quantify nursing workload, along with the reason for admission, functional status, estimates of in-hospital mortality and life expectancy. The programme stores information in a database, and produces a print-out in a situation\\/background\\/assessment\\/recommendation (SBAR) format. The average time taken to enter 629 patient encounters was 6.6 minutes. Pain was the most common presentation for low workload patients, while high workload patients often presented with altered mental status and reduced mobility. There was only a modest correlation between the risk of death and nursing workload. The programme measures nursing workload without further paperwork, and improves routine documentation with a legible brief report that is automatically generated. This report can be shared and provides data that is immediately available for day-to-day care, audit, quality control and service planning.

  7. Documentation design for probabilistic risk assessment

    International Nuclear Information System (INIS)

    Parkinson, W.J.; von Herrmann, J.L.

    1985-01-01

    This paper describes a framework for documentation design of probabilistic risk assessment (PRA) and is based on the EPRI document NP-3470 ''Documentation Design for Probabilistic Risk Assessment''. The goals for PRA documentation are stated. Four audiences are identified which PRA documentation must satisfy, and the documentation consistent with the needs of the various audiences are discussed, i.e., the Summary Report, the Executive Summary, the Main Report, and Appendices. The authors recommend the documentation specifications discussed herein as guides rather than rigid definitions

  8. Reactive documentation system

    Science.gov (United States)

    Boehnlein, Thomas R.; Kramb, Victoria

    2018-04-01

    Proper formal documentation of computer acquired NDE experimental data generated during research is critical to the longevity and usefulness of the data. Without documentation describing how and why the data was acquired, NDE research teams lose capability such as their ability to generate new information from previously collected data or provide adequate information so that their work can be replicated by others seeking to validate their research. Despite the critical nature of this issue, NDE data is still being generated in research labs without appropriate documentation. By generating documentation in series with data, equal priority is given to both activities during the research process. One way to achieve this is to use a reactive documentation system (RDS). RDS prompts an operator to document the data as it is generated rather than relying on the operator to decide when and what to document. This paper discusses how such a system can be implemented in a dynamic environment made up of in-house and third party NDE data acquisition systems without creating additional burden on the operator. The reactive documentation approach presented here is agnostic enough that the principles can be applied to any operator controlled, computer based, data acquisition system.

  9. Advanced Photon Source experimental beamline Safety Assessment Document: Addendum to the Advanced Photon Source Accelerator Systems Safety Assessment Document (APS-3.2.2.1.0)

    International Nuclear Information System (INIS)

    1995-01-01

    This Safety Assessment Document (SAD) addresses commissioning and operation of the experimental beamlines at the Advanced Photon Source (APS). Purpose of this document is to identify and describe the hazards associated with commissioning and operation of these beamlines and to document the measures taken to minimize these hazards and mitigate the hazard consequences. The potential hazards associated with the commissioning and operation of the APS facility have been identified and analyzed. Physical and administrative controls mitigate identified hazards. No hazard exists in this facility that has not been previously encountered and successfully mitigated in other accelerator and synchrotron radiation research facilities. This document is an updated version of the APS Preliminary Safety Analysis Report (PSAR). During the review of the PSAR in February 1990, the APS was determined to be a Low Hazard Facility. On June 14, 1993, the Acting Director of the Office of Energy Research endorsed the designation of the APS as a Low Hazard Facility, and this Safety Assessment Document supports that designation

  10. Transportation System Requirements Document

    International Nuclear Information System (INIS)

    1993-09-01

    This Transportation System Requirements Document (Trans-SRD) describes the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of this document is to define the system-level requirements for Transportation consistent with the CRWMS Requirement Document (CRD). These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presents an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. The interface identification and description are published in the CRWMS Interface Specification

  11. TRANSPORTATION SYSTEM REQUIREMENTS DOCUMENT

    International Nuclear Information System (INIS)

    2004-01-01

    This document establishes the Transportation system requirements for the U.S. Department of Energy's (DOE's) Civilian Radioactive Waste Management System (CRWMS). These requirements are derived from the Civilian Radioactive Waste Management System Requirements Document (CRD). The Transportation System Requirements Document (TSRD) was developed in accordance with LP-3.1Q-OCRWM, Preparation, Review, and Approval of Office of National Transportation Level-2 Baseline Requirements. As illustrated in Figure 1, the TSRD forms a part of the DOE Office of Civilian Radioactive Waste Management (OCRWM) Technical Baseline

  12. Assessing the Readability of Medical Documents: A Ranking Approach.

    Science.gov (United States)

    Zheng, Jiaping; Yu, Hong

    2018-03-23

    The use of electronic health record (EHR) systems with patient engagement capabilities, including viewing, downloading, and transmitting health information, has recently grown tremendously. However, using these resources to engage patients in managing their own health remains challenging due to the complex and technical nature of the EHR narratives. Our objective was to develop a machine learning-based system to assess readability levels of complex documents such as EHR notes. We collected difficulty ratings of EHR notes and Wikipedia articles using crowdsourcing from 90 readers. We built a supervised model to assess readability based on relative orders of text difficulty using both surface text features and word embeddings. We evaluated system performance using the Kendall coefficient of concordance against human ratings. Our system achieved significantly higher concordance (.734) with human annotators than did a baseline using the Flesch-Kincaid Grade Level, a widely adopted readability formula (.531). The improvement was also consistent across different disease topics. This method's concordance with an individual human user's ratings was also higher than the concordance between different human annotators (.658). We explored methods to automatically assess the readability levels of clinical narratives. Our ranking-based system using simple textual features and easy-to-learn word embeddings outperformed a widely used readability formula. Our ranking-based method can predict relative difficulties of medical documents. It is not constrained to a predefined set of readability levels, a common design in many machine learning-based systems. Furthermore, the feature set does not rely on complex processing of the documents. One potential application of our readability ranking is personalization, allowing patients to better accommodate their own background knowledge. ©Jiaping Zheng, Hong Yu. Originally published in JMIR Medical Informatics (http://medinform.jmir.org), 23.03.2018.

  13. CNEA's quality system documentation

    International Nuclear Information System (INIS)

    Mazzini, M.M.; Garonis, O.H.

    1998-01-01

    Full text: To obtain an effective and coherent documentation system suitable for CNEA's Quality Management Program, we decided to organize the CNEA's quality documentation with : a- Level 1. Quality manual. b- Level 2. Procedures. c-Level 3. Qualities plans. d- Level 4: Instructions. e- Level 5. Records and other documents. The objective of this work is to present a standardization of the documentation of the CNEA's quality system of facilities, laboratories, services, and R and D activities. Considering the diversity of criteria and formats for elaboration the documentation by different departments, and since ultimately each of them generally includes the same quality management policy, we proposed the elaboration of a system in order to improve the documentation, avoiding unnecessary time wasting and costs. This will aloud each sector to focus on their specific documentation. The quality manuals of the atomic centers fulfill the rule 3.6.1 of the Nuclear Regulatory Authority, and the Safety Series 50-C/SG-Q of the International Atomic Energy Agency. They are designed by groups of competent and highly trained people of different departments. The normative procedures are elaborated with the same methodology as the quality manuals. The quality plans which describe the organizational structure of working group and the appropriate documentation, will asses the quality manuals of facilities, laboratories, services, and research and development activities of atomic centers. The responsibilities for approval of the normative documentation are assigned to the management in charge of the administration of economic and human resources in order to fulfill the institutional objectives. Another improvement aimed to eliminate unnecessary invaluable processes is the inclusion of all quality system's normative documentation in the CNEA intranet. (author) [es

  14. Assessment of LANL solid low-level mixed waste documentation

    International Nuclear Information System (INIS)

    Jennrich, E.A.; Lund, D.M.; Davis, K.D.; Hoevemeyer, S.S.

    1991-04-01

    DOE Order 5820.2A requires that a system performance assessment be conducted to assure efficient and compliant management of all radioactive waste. The objective of this report is to determine the present status of the Radioactive Waste Operations Section and the Chemical Waste Operations Section capabilities regarding preparation and maintenance of appropriate criteria, plans, and procedures. Additionally, a comparison is made which identifies areas where these documents are not presently in existence or being fully implemented. The documents being assessed in this report are: Solid Low-Level Mixed Waste Acceptance Criteria, Solid Low-Level Mixed Waste Characterization Plan, Solid Low-Level Mixed waste Certification Plan, Solid Low-Level Mixed Waste Acceptance Procedures, Solid Low-Level Mixed Waste characterization Procedures, Solid Low-Level Mixed Waste Certification Procedures, Solid Low-Level Mixed Waste Training Procedures, and Solid Low-Level Mixed Waste Recordkeeping Requirements. This report compares the current status of preparation and implementation, by the Radioactive Waste Operations Section and the Chemical Waste Operations Section, of these documents to the requirements of DOE 5820.2A,. 40 CFR 260 to 270, and to recommended practice. Chapters 2 through 9 of the report presents the results of the comparison in tabular form for each of the documents being assessed, followed by narrative discussion of all areas which are perceived to be unsatisfactory or out of compliance with respect to the availability and content of the documents. The final subpart of each of the following chapters provides recommendations where documentation practices may be improved to achieve compliance or to follow the recommended practice

  15. IDC System Specification Document.

    Energy Technology Data Exchange (ETDEWEB)

    Clifford, David J.

    2014-12-01

    This document contains the system specifications derived to satisfy the system requirements found in the IDC System Requirements Document for the IDC Reengineering Phase 2 project. Revisions Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Reengineering Project Team Initial delivery M. Harris

  16. CP-50 calibration facility radiological safety assessment document

    International Nuclear Information System (INIS)

    Chilton, M.W.; Hill, R.L.; Eubank, B.F.

    1980-03-01

    The CP-50 Calibration Facility Radiological Safety Assessment document, prepared at the request of the Nevada Operations Office of the US Department of Energy to satisfy provisions of ERDA Manual Chapter 0531, presents design features, systems controls, and procedures used in the operation of the calibration facility. Site and facility characteristics and routine and non-routine operations, including hypothetical incidents or accidents are discussed and design factors, source control systems, and radiation monitoring considerations are described

  17. Assessment of LANL solid low-level waste management documentation

    International Nuclear Information System (INIS)

    Klein, R.B.; Jennrich, E.A.; Lund, D.M.; Danna, J.G.; Davis, K.D.; Rutz, A.C.

    1991-04-01

    DOE Order 5820.2A requires that a system performance assessment be conducted to assure efficient and compliant management of all radioactive waste. The objective of this report is to determine the present status of the Radioactive Waste Operations Section's capabilities regarding preparation and maintenance of appropriate criteria, plans and procedures and identify particular areas where these documents are not presently in existence or being fully implemented. DOE Order 5820.2A, Radioactive Waste Management, Chapter III sets forth the requirements and guidelines for preparation and implementation of criteria, plans and procedures to be utilized in the management of solid low-level waste. The documents being assessed in this report are: Solid Low-Level Waste Acceptance Criteria, Solid Low-Level Waste Characterization Plan, Solid Low-Level Waste Certification Plan, Solid Low-Level Waste Acceptance Procedures, Solid Low-Level Waste Characterization Procedures, Solid Low-Level Waste Certification Procedures, Solid Low-Level Waste Training Procedures, and Solid Low-Level Waste Recordkeeping Procedures. Suggested outlines for these documents are presented as Appendix A

  18. Civilian Radioactive Waste Management System Requirements Document

    International Nuclear Information System (INIS)

    1992-12-01

    This document specifies the top-level requirements for the Civilian Radioactive Waste Management System (CRWMS). The document is referred to herein as the CRD, for CRWMS Requirements document. The OCRWM System Engineering Management Plan (SEMP) establishes the technical document hierarchy (hierarchy of technical requirements and configuration baseline documents) for the CRWMS program. The CRD is the top-level document in this hierarchy. The immediate subordinate documents are the System Requirements Documents (SRDS) for the four elements of the CRWMS and the Interface Specification (IFS). The four elements of the CRWMS are the Waste Acceptance System, the Transportation System, the Monitored Retrievable Storage (MRS) System and the Mined Geologic Disposal System (MGDS). The Interface Specification describes the six inter-element interfaces between the four elements. This hierarchy establishes the requirements to be addressed by the design of the system elements. Many of the technical requirements for the CRWMS are documented in a variety of Federal regulations, DOE directives and other Government documentation. It is the purpose of the CRD to establish the technical requirements for the entire program. In doing so, the CRD summarizes source documentation for requirements that must be addressed by the program, specifies particular requirements, and documents derived requirements that are not covered in regulatory and other Government documentation, but are necessary to accomplish the mission of the CRWMS. The CRD defines the CRWMS by identifying the top-level functions the elements must perform (These top-level functions were derived using functional analysis initially documented in the Physical System Requirements (PSR) documents). The CRD also defines the top-level physical architecture of the system and allocates the functions and requirements to the architectural elements of the system

  19. Nuclear power plants documentation system

    International Nuclear Information System (INIS)

    Schwartz, E.L.

    1991-01-01

    Since the amount of documents (type and quantity) necessary for the entire design of a NPP is very large, this implies that an overall and detailed identification, filling and retrieval system shall be implemented. This is even more applicable to the FINAL QUALITY DOCUMENTATION of the plant, as stipulated by IAEA Safety Codes and related guides. For such a purpose it was developed a DOCUMENTATION MANUAL, which describes in detail the before mentioned documentation system. Here we present the expected goals and results which we have to reach for Angra 2 and 3 Project. (author)

  20. ELECTRICAL POWER SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    M. Maniyar

    2004-06-22

    The purpose of this revision of the System Description Document (SDD) is to establish requirements that drive the design of the electrical power system and their bases to allow the design effort to proceed to License Application. This SDD is a living document that will be revised at strategic points as the design matures over time. This SDD identifies the requirements and describes the system design as they exist at this time, with emphasis on those attributes of the design provided to meet the requirements. This SDD has been developed to be an engineering tool for design control. Accordingly, the primary audience are design engineers. This type of SDD leads and follows the design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential to performing the design process. This SDD follows the design with regard to the description of the system. The description provided in the SDD is a reflection of the results of the design process to date. Functional and operational requirements applicable to this system are obtained from ''Project Functional and Operational Requirements'' (F&OR) (Siddoway, 2003). Other requirements to support the design process have been taken from higher level requirements documents such as ''Project Design Criteria Document'' (PDC) (Doraswamy 2004), the fire hazards analyses, and the preclosure safety analysis. The above mentioned low-level documents address ''Project Requirements Document'' (PRD) (Canori and Leitner 2003) requirements. This SDD includes several appendices with supporting information. Appendix B lists key system charts, diagrams, drawings, and lists; and Appendix C is a list of system procedures.

  1. Tank Monitoring and Document control System (TMACS) As Built Software Design Document

    International Nuclear Information System (INIS)

    GLASSCOCK, J.A.

    2000-01-01

    This document describes the software design for the Tank Monitor and Control System (TMACS). This document captures the existing as-built design of TMACS as of November 1999. It will be used as a reference document to the system maintainers who will be maintaining and modifying the TMACS functions as necessary. The heart of the TMACS system is the ''point-processing'' functionality where a sample value is received from the field sensors and the value is analyzed, logged, or alarmed as required. This Software Design Document focuses on the point-processing functions

  2. Mined Geologic Disposal System Requirements Document

    International Nuclear Information System (INIS)

    1993-01-01

    This Mined Geologic Disposal System Requirements document (MGDS-RD) describes the functions to be performed by, and the requirements for, a Mined Geologic Disposal System (MGDS) for the permanent disposal of spent nuclear fuel (SNF) and commercial and defense high level radioactive waste (HLW) in support of the Civilian Radioactive Waste Management System (CRWMS). The development and control of the MGDS-RD is quality-affecting work and is subject to the Department of Energy (DOE) Office of Civilian Radioactive Waste Management (OCRWM) Quality Assurance Requirements Document (QARD). As part of the technical requirements baseline, it is also subject to Baseline Management Plan controls. The MGDS-RD and the other program-level requirements documents have been prepared and managed in accordance with the Technical Document Preparation Plan (TDPP) for the Preparation of System Requirements Documents

  3. Tank Monitoring and Document control System (TMACS) As Built Software Design Document

    Energy Technology Data Exchange (ETDEWEB)

    GLASSCOCK, J.A.

    2000-01-27

    This document describes the software design for the Tank Monitor and Control System (TMACS). This document captures the existing as-built design of TMACS as of November 1999. It will be used as a reference document to the system maintainers who will be maintaining and modifying the TMACS functions as necessary. The heart of the TMACS system is the ''point-processing'' functionality where a sample value is received from the field sensors and the value is analyzed, logged, or alarmed as required. This Software Design Document focuses on the point-processing functions.

  4. Towards web documents quality assessment for digital humanities scholars

    NARCIS (Netherlands)

    Ceolin, D.; Noordegraaf, Julia; Aroyo, L.M.; van Son, C.M.; Nejdl, Wolfgang; Hall, Wendy; Parigi, Paolo; Staab, Steffen

    2016-01-01

    We present a framework for assessing the quality of Web documents, and a baseline of three quality dimensions: trustworthiness, objectivity and basic scholarly quality. Assessing Web document quality is a "deep data" problem necessitating approaches to handle both data size and complexity.

  5. Replacement Saltwell Pumping System Document Bibliography

    International Nuclear Information System (INIS)

    BELLOMY, J.R.

    2000-01-01

    This document bibliography is prepared to identify engineering documentation developed during the design of the Replacement Saltwell Pumping System. The bibliography includes all engineering supporting documents and correspondence prepared prior to the deployment of the system in the field. All documents referenced are available electronically through the Records Management Information System (RMIS). Major components of the Replacement Saltwell Pumping System include the Sundyne Canned Motor Pump, the Water Filter Skid, the Injection Water Skid and the Backflow Preventer Assembly. Drawing H-14-104498 provides an index of drawings (fabrication details, PandIDs, etc.) prepared to support development of the Replacement Saltwell Pumping System. Specific information pertaining to new equipment can be found in Certified Vendor Information (CVI) File 50124. This CVI file has been established specifically for new equipment associated with the Replacement Saltwell Pumping System

  6. ELECTRICAL SUPPORT SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    Roy, S.

    2004-01-01

    The purpose of this revision of the System Design Description (SDD) is to establish requirements that drive the design of the electrical support system and their bases to allow the design effort to proceed to License Application. This SDD is a living document that will be revised at strategic points as the design matures over time. This SDD identifies the requirements and describes the system design as they exist at this time, with emphasis on those attributes of the design provided to meet the requirements. This SDD has been developed to be an engineering tool for design control. Accordingly, the primary audience/users are design engineers. This type of SDD both ''leads'' and ''trails'' the design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. The SDD trails the design with regard to the description of the system. The description provided in the SDD is a reflection of the results of the design process to date. Functional and operational requirements applicable to electrical support systems are obtained from the ''Project Functional and Operational Requirements'' (F andOR) (Siddoway 2003). Other requirements to support the design process have been taken from higher-level requirements documents such as the ''Project Design Criteria Document'' (PDC) (Doraswamy 2004), and fire hazards analyses. The above-mentioned low-level documents address ''Project Requirements Document'' (PRD) (Canon and Leitner 2003) requirements. This SDD contains several appendices that include supporting information. Appendix B lists key system charts, diagrams, drawings, and lists, and Appendix C includes a list of system procedures

  7. Emergency Response Capability Baseline Needs Assessment - Requirements Document

    Energy Technology Data Exchange (ETDEWEB)

    Sharry, J A

    2016-10-04

    This document was prepared by John A. Sharry, LLNL Fire Marshal and LLNL Division Leader for Fire Protection and reviewed by LLNL Emergency Management Department Head James Colson. The document follows and expands upon the format and contents of the DOE Model Fire Protection Baseline Capabilities Assessment document contained on the DOE Fire Protection Web Site, but only addresses emergency response.

  8. ELECTRICAL SUPPORT SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    S. Roy

    2004-06-24

    The purpose of this revision of the System Design Description (SDD) is to establish requirements that drive the design of the electrical support system and their bases to allow the design effort to proceed to License Application. This SDD is a living document that will be revised at strategic points as the design matures over time. This SDD identifies the requirements and describes the system design as they exist at this time, with emphasis on those attributes of the design provided to meet the requirements. This SDD has been developed to be an engineering tool for design control. Accordingly, the primary audience/users are design engineers. This type of SDD both ''leads'' and ''trails'' the design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. The SDD trails the design with regard to the description of the system. The description provided in the SDD is a reflection of the results of the design process to date. Functional and operational requirements applicable to electrical support systems are obtained from the ''Project Functional and Operational Requirements'' (F&OR) (Siddoway 2003). Other requirements to support the design process have been taken from higher-level requirements documents such as the ''Project Design Criteria Document'' (PDC) (Doraswamy 2004), and fire hazards analyses. The above-mentioned low-level documents address ''Project Requirements Document'' (PRD) (Canon and Leitner 2003) requirements. This SDD contains several appendices that include supporting information. Appendix B lists key system charts, diagrams, drawings, and lists, and Appendix C includes a list of system procedures.

  9. Integrated Management System, Configuration and Document Control for Research Reactors

    International Nuclear Information System (INIS)

    Steynberg, B.J.; Bruyn, J.F. du

    2017-01-01

    An integrated management system is a single management framework establishing all the processes necessary for the organisation to address all its goals and objectives. Very often only quality, environment and health & safety goals are included when referred to an integrated management system. However, within the research reactor environment such system should include goals pertinent to economic, environmental, health, operational, quality, safeguards, safety, security, and social considerations. One of the important objectives of an integrated management is to create the environment for a healthy safety culture. Configuration management is a disciplined process that involves both management and technical direction to establish and document the design requirements and the physical configuration of the research reactor and to ensure that they remain consistent with each other and the documentation. Configuration is the combination of the physical, functional, and operational characteristics of the structures, systems, and components (SSCs) or parts of the research reactor, operation, or activity. The basic objectives and general principles of configuration management are the same for all research reactors. The objectives of configuration management are to: a) Establish consistency among design requirements, physical configuration, and documentation (including analyses, drawings, and procedures) for the research reactor; b) Maintain this consistency throughout the life of the research reactor, particularly as changes are being made; and c) Retain confidence in the safety of the research reactor. The key elements needed to manage the configuration of research reactors are design requirements, work control, change control, document control, and configuration management assessments. The objective of document control is to ensure that only the most recently approved versions of documents are used in the process of operating, maintaining, and modifying the research reactor

  10. Servir: an automated document delivery system

    International Nuclear Information System (INIS)

    Lima, E.C.; Azevedo Coutinho, O.C. de

    1986-01-01

    SERVIR, an automated document delivery system developed by CIN/CNEN, is described. Parametric procedures for reading bibliographic data bases and requesting documents from libraries through computer are specified. Statistical procedures, accounting system and the on-line fulfillment of requests are presented. (Author) [pt

  11. SNF AGING SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    L.L. Swanson

    2005-04-06

    The purpose of this system description document (SDD) is to establish requirements that drive the design of the spent nuclear fuel (SNF) aging system and associated bases, which will allow the design effort to proceed. This SDD will be revised at strategic points as the design matures. This SDD identifies the requirements and describes the system design, as it currently exists, with emphasis on attributes of the design provided to meet the requirements. This SDD is an engineering tool for design control; accordingly, the primary audience and users are design engineers. This SDD is part of an iterative design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. The SDD follows the design with regard to the description of the system. The description provided in the SDD reflects the current results of the design process. Throughout this SDD, the term aging cask applies to vertical site-specific casks and to horizontal aging modules. The term overpack is a vertical site-specific cask that contains a dual-purpose canister (DPC) or a disposable canister. Functional and operational requirements applicable to this system were obtained from ''Project Functional and Operational Requirements'' (F&OR) (Curry 2004 [DIRS 170557]). Other requirements that support the design process were taken from documents such as ''Project Design Criteria Document'' (PDC) (BSC 2004 [DES 171599]), ''Site Fire Hazards Analyses'' (BSC 2005 [DIRS 172174]), and ''Nuclear Safety Design Bases for License Application'' (BSC 2005 [DIRS 171512]). The documents address requirements in the ''Project Requirements Document'' (PRD) (Canori and Leitner 2003 [DIRS 166275]). This SDD includes several appendices. Appendix A is a Glossary; Appendix B is a list of key system charts

  12. SNF AGING SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    L.L. Swanson

    2005-01-01

    The purpose of this system description document (SDD) is to establish requirements that drive the design of the spent nuclear fuel (SNF) aging system and associated bases, which will allow the design effort to proceed. This SDD will be revised at strategic points as the design matures. This SDD identifies the requirements and describes the system design, as it currently exists, with emphasis on attributes of the design provided to meet the requirements. This SDD is an engineering tool for design control; accordingly, the primary audience and users are design engineers. This SDD is part of an iterative design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. The SDD follows the design with regard to the description of the system. The description provided in the SDD reflects the current results of the design process. Throughout this SDD, the term aging cask applies to vertical site-specific casks and to horizontal aging modules. The term overpack is a vertical site-specific cask that contains a dual-purpose canister (DPC) or a disposable canister. Functional and operational requirements applicable to this system were obtained from ''Project Functional and Operational Requirements'' (F andOR) (Curry 2004 [DIRS 170557]). Other requirements that support the design process were taken from documents such as ''Project Design Criteria Document'' (PDC) (BSC 2004 [DES 171599]), ''Site Fire Hazards Analyses'' (BSC 2005 [DIRS 172174]), and ''Nuclear Safety Design Bases for License Application'' (BSC 2005 [DIRS 171512]). The documents address requirements in the ''Project Requirements Document'' (PRD) (Canori and Leitner 2003 [DIRS 166275]). This SDD includes several appendices. Appendix A is a Glossary; Appendix B is a list of key system charts, diagrams, drawings, lists and additional supporting information; and Appendix C is a list of

  13. Electronic Document Management Using Inverted Files System

    Science.gov (United States)

    Suhartono, Derwin; Setiawan, Erwin; Irwanto, Djon

    2014-03-01

    The amount of documents increases so fast. Those documents exist not only in a paper based but also in an electronic based. It can be seen from the data sample taken by the SpringerLink publisher in 2010, which showed an increase in the number of digital document collections from 2003 to mid of 2010. Then, how to manage them well becomes an important need. This paper describes a new method in managing documents called as inverted files system. Related with the electronic based document, the inverted files system will closely used in term of its usage to document so that it can be searched over the Internet using the Search Engine. It can improve document search mechanism and document save mechanism.

  14. Electronic Document Management Using Inverted Files System

    Directory of Open Access Journals (Sweden)

    Suhartono Derwin

    2014-03-01

    Full Text Available The amount of documents increases so fast. Those documents exist not only in a paper based but also in an electronic based. It can be seen from the data sample taken by the SpringerLink publisher in 2010, which showed an increase in the number of digital document collections from 2003 to mid of 2010. Then, how to manage them well becomes an important need. This paper describes a new method in managing documents called as inverted files system. Related with the electronic based document, the inverted files system will closely used in term of its usage to document so that it can be searched over the Internet using the Search Engine. It can improve document search mechanism and document save mechanism.

  15. NILDE, Network Inter Library Document Exchange: An Italian Document Delivery System

    Science.gov (United States)

    Brunetti, F.; Gasperini, A.; Mangiaracina, S.

    2007-10-01

    This poster presents NILDE, a document delivery system supporting the exchange of documents via the internet. The system has been set up by the Central Library of the National Research Council of Bologna (Italy) in order to make use of new internet technology, to promote cooperation between Italian university libraries and research libraries, and to achieve quick response times in satisfying DD requests. The Arcetri Astrophysical Observatory Library was the first astronomical library to join the NILDE project from its earliest days in 2002. Many were the reasons for this choice: automation of the DD processes, security and reliability of the network, creation of usage statistics and reports, reduction of DD System management costs and so on. This work describes the benefits of NILDE and discusses the role of an organized document delivery system as an important tool to cope with the difficult constraints of the publishing market.

  16. Ahmad's NPRT System: A Practical Innovation for Documenting Male Pattern Baldness

    OpenAIRE

    Ahmad, Muhammad

    2016-01-01

    Various classifications for male pattern baldness are mentioned in the literature. The 'Norwood's classification is the most commonly used but it has certain limitations. The new system has included 'three' extra features which were not mentioned in any other classification. It provides an opportunity to document the full and correct picture while documenting male pattern baldness. It also aids in assessing the treatment for various degrees of baldness.

  17. Ahmad's NPRT system: A practical innovation for documenting male pattern baldness

    Directory of Open Access Journals (Sweden)

    Muhammad Ahmad

    2016-01-01

    Full Text Available Various classifications for male pattern baldness are mentioned in the literature. The 'Norwood's classification is the most commonly used but it has certain limitations. The new system has included 'three' extra features which were not mentioned in any other classification. It provides an opportunity to document the full and correct picture while documenting male pattern baldness. It also aids in assessing the treatment for various degrees of baldness.

  18. Waste management system requirements document

    International Nuclear Information System (INIS)

    1991-02-01

    This volume defines the top level requirements for the Mined Geologic Disposal System (MGDS). It is designed to be used in conjunction with Volume 1 of the WMSR, General System Requirements. It provides a functional description expanding the requirements allocated to the MGDS in Volume 1 and elaborates on each requirement by providing associated performance criteria as appropriate. Volumes 1 and 4 of the WMSR provide a minimum set of requirements that must be satisfied by the final MGDS design. This document sets forth specific requirements that must be fulfilled. It is not the intent or purpose of this top level document to describe how each requirement is to be satisfied in the final MGDS design. Each subsequent level of the technical document hierarchy must provide further guidance and definition as to how each of these requirements is to be implemented in the design. It is expected that each subsequent level of requirements will be significantly more detailed. Section 2 of this volume provides a functional description of the MGDS. Each function is addressed in terms of requirements, and performance criteria. Section 3 provides a list of controlling documents. Each document cited in a requirement of Chapter 2 is included in this list and is incorporated into this document as a requirement on the final system. The WMSR addresses only federal requirements (i.e., laws, regulations and DOE orders). State and local requirements are not addressed. However, it will be specifically noted at the potentially affected WMSR requirements that there could be additional or more stringent regulations imposed by a state or local requirements or administering agency over the cited federal requirements

  19. The System 80+ Standard Plant design control document. Volume 21

    International Nuclear Information System (INIS)

    1997-01-01

    This Design Control Document (DCD) is a repository of information comprising the System 80+trademark Standard Plant Design. The DCD also provides that design-related information to be incorporated by reference in the design certification rule for the System 80+ Standard Plant Design. Applicants for a combined license pursuant to 10 CFR 52 must ensure that the final Design Certification Rule and the associated Statements of Consideration are used when making all licensing decisions relevant to the System 80+ Standard Plant Design. The Design Control Document contains the DCD introduction, The Certified Design Material (CDM) [i.e., ''Tier 1''] and the Approved Design Material (ADM) [i.e., ''Tier 2''] for the System 80+ Standard Plant Design. The CDM includes the following sections: (1) Introductory material; (2) Certified Design Material for System 80+ systems and structures; (3) Certified Design Material for non-system-based aspects of the System 80+ Certified design; (4) Interface requirements; and (5) Site parameters. The ADM, to the extent applicable for the System 80+ Standard Plant Design, includes: (1) the information required for the final safety analysis report under 20 CFR 50.34; (2) other relevant information required by 10 CFR 52.47; and (3) emergency operations guidelines. This volume contains parts 1--10 of section 19 (Probabilistic Risk Assessment) of the ADM Design and Analysis. Topics covered are: methodology; initiating event evaluation; accident sequence determination; data analysis; systems analysis; external events analysis; shutdown risk assessment; accident sequence quantification; and sensitivity analysis. Also included in this volume are Appendix 19.8A Shutdown Risk Assessment and Appendix A to Appendix 19.8A Request for Information

  20. Electronic document management systems: an overview.

    Science.gov (United States)

    Kohn, Deborah

    2002-08-01

    For over a decade, most health care information technology (IT) professionals erroneously learned that document imaging, which is one of the many component technologies of an electronic document management system (EDMS), is the only technology of an EDMS. In addition, many health care IT professionals erroneously believed that EDMSs have either a limited role or no place in IT environments. As a result, most health care IT professionals do not understand documents and unstructured data and their value as structured data partners in most aspects of transaction and information processing systems.

  1. Mined Geologic Disposal System Requirements Document

    International Nuclear Information System (INIS)

    1994-03-01

    This Mined Geologic Disposal System Requirements Document (MGDS-RD) describes the functions to be performed by, and the requirements for, a Mined Geologic Disposal System (MGDS) for the permanent disposal of spent nuclear fuel (SNF) (including SNF loaded in multi-purpose canisters (MPCs)) and commercial and defense high-level radioactive waste (HLW) in support of the Civilian Radioactive Waste Management System (CRWMS). The purpose of the MGDS-RD is to define the program-level requirements for the design of the Repository, the Exploratory Studies Facility (ESF), and Surface Based Testing Facilities (SBTF). These requirements include design, operation, and decommissioning requirements to the extent they impact on the physical development of the MGDS. The document also presents an overall description of the MGDS, its functions (derived using the functional analysis documented by the Physical System Requirements (PSR) documents as a starting point), its segments as described in Section 3.1.3, and the requirements allocated to the segments. In addition, the program-level interfaces of the MGDS are identified. As such, the MGDS-RD provides the technical baseline for the design of the MGDS

  2. Probabilistic risk assessment (PRA) reference document. Final report

    International Nuclear Information System (INIS)

    Murphy, J.A.

    1984-09-01

    This document describes the current status of probabilistic risk assessment (PRA) as practiced in the nuclear reactor regulatory process. The PRA studies that have been completed or are under way are reviewed. The levels of maturity of the methodologies used in a PRA are discussed. Insights derived from PRAs are listed. The potential uses of PRA results for regulatory purposes are discussed. This document was issued for comment in February 1984 entitled Probabilistic Risk Assessment (PRA): Status Report and Guidance for Regulatory Application. The comments received on the draft have been considered for this final version of the report

  3. Waste Acceptance System Requirements document (WASRD)

    International Nuclear Information System (INIS)

    1993-01-01

    This Waste Acceptance System Requirements document (WA-SRD) describes the functions to be performed and the technical requirements for a Waste Acceptance System for accepting spent nuclear fuel (SNF) and high-level radioactive waste (HLW) into the Civilian Radioactive Waste Management System (CRWMS). This revision of the WA-SRD addresses the requirements for the acceptance of HLW. This revision has been developed as a top priority document to permit DOE's Office of Environmental Restoration and Waste Management (EM) to commence waste qualification runs at the Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF) in a timely manner. Additionally, this revision of the WA-SRD includes the requirements from the Physical System Requirements -- Accept Waste document for the acceptance of SNF. A subsequent revision will fully address requirements relative to the acceptance of SNF

  4. Honeywell modular automation system computer software documentation

    International Nuclear Information System (INIS)

    Cunningham, L.T.

    1997-01-01

    This document provides a Computer Software Documentation for a new Honeywell Modular Automation System (MAS) being installed in the Plutonium Finishing Plant (PFP). This system will be used to control new thermal stabilization furnaces in HA-21I

  5. Comprehensive Psychopathological Assessment Based on the Association for Methodology and Documentation in Psychiatry (AMDP) System: Development, Methodological Foundation, Application in Clinical Routine, and Research

    Science.gov (United States)

    Stieglitz, Rolf-Dieter; Haug, Achim; Fähndrich, Erdmann; Rösler, Michael; Trabert, Wolfgang

    2017-01-01

    The documentation of psychopathology is core to the clinical practice of the psychiatrist and clinical psychologist. However, both in initial as well as further training and specialization in their fields, this particular aspect of their work receives scanty attention only. Yet, for the past 50 years, the Association for Methodology and Documentation in Psychiatry (AMDP) System has been in existence and available as a tool to serve precisely the purpose of offering a systematic introduction to the terminology and documentation of psychopathology. The motivation for its development was based on the need for an assessment procedure for the reliable documentation of the effectiveness of newly developed psychopharmacological substances. Subsequently, the AMDP-System began to be applied in the context of investigations into a number of methodological issues in psychiatry (e.g., the frequency and specificity of particular symptoms, the comparison of rating scales). The System then became increasingly important also in clinical practice and, today, represents the most used instrument for the documentation of psychopathology in the German-speaking countries of Europe. This paper intends to offer an overview of the AMDP-System, its origins, design, and functionality. After an initial account of the history and development of the AMDP-System, the discussion will in turn focus on the System’s underlying methodological principles, the transfer of clinical skills and competencies in its practical application, and its use in research and clinical practice. Finally, potential future areas of development in relation to the AMDP-System are explored. PMID:28439242

  6. CASK/MSC/WP PREPARATION SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    S. Drummond

    2005-01-01

    The purpose of this system description document (SDD) is to establish requirements that drive the design of the Cask/MSC/WP preparation system and their bases to allow the design effort to proceed to license application. This SDD is a living document that will be revised at strategic points as the design matures over time. This SDD identifies the requirements and describes the system design, as they exist at this time, with emphasis on those attributes of the design provided to meet the requirements. This SDD has been developed to be an engineering tool for design control. Accordingly, the primary audience and users are design engineers. This type of SDD both leads and trails the design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. This SDD trails the design with regard to the description of the system. The description provided in the SDD is a reflection of the results of the design process to date. This SDD addresses the ''Project Requirements Document'' (PRD) (Canori and Leitner 2003 [DIRS 166275]) requirements. Additional PRD requirements may be cited, as applicable, to drive the design of specific aspects of the system, with justifications provided in the basis. Functional and operational requirements applicable to this system are obtained from the ''Project Functional and Operational Requirements'' (F and OR) (Curry 2004 [DIRS 170557]) document. Other requirements to support the design process have been taken from higher-level requirements documents such as the ''Project Design Criteria Document'' (PDC) (BSC 2004 [DIRS 171599]) and the preclosure safety analyses

  7. Critical issues in an electronic documentation system.

    Science.gov (United States)

    Weir, Charlene R; Nebeker, Jonathan R

    2007-10-11

    The Veterans Health Administration (VHA), of the U.S. Department of Veteran Affairs has instituted a medical record (EMR) that includes electronic documentation of all narrative components of the medical record. To support clinicians using the system, multiple efforts have been instituted to ease the creation of narrative reports. Although electronic documentation is easier to read and improves access to information, it also may create new and additional hazards for users. This study is the first step in a series of studies to evaluate the issues surrounding the creation and use of electronic documentation. Eighty-eight providers across multiple clinical roles were interviewed in 10 primary care sites in the VA system. Interviews were tape-recorded, transcribed and qualitatively analyzed for themes. In addition, specific questions were asked about perceived harm due to electronic documentation practices. Five themes relating to difficulties with electronic documentation were identified: 1) information overload; 2) hidden information; 3) lack of trust; 4) communication; 5) decision-making. Three providers reported that they knew of an incident where current documentation practices had caused patient harm and over 75% of respondents reported significant mis-trust of the system.

  8. Honeywell Modular Automation System Computer Software Documentation

    International Nuclear Information System (INIS)

    CUNNINGHAM, L.T.

    1999-01-01

    This document provides a Computer Software Documentation for a new Honeywell Modular Automation System (MAS) being installed in the Plutonium Finishing Plant (PFP). This system will be used to control new thermal stabilization furnaces in HA-211 and vertical denitration calciner in HC-230C-2

  9. CASK/MSC/WP PREPARATION SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    S. Drummond

    2005-04-12

    The purpose of this system description document (SDD) is to establish requirements that drive the design of the Cask/MSC/WP preparation system and their bases to allow the design effort to proceed to license application. This SDD is a living document that will be revised at strategic points as the design matures over time. This SDD identifies the requirements and describes the system design, as they exist at this time, with emphasis on those attributes of the design provided to meet the requirements. This SDD has been developed to be an engineering tool for design control. Accordingly, the primary audience and users are design engineers. This type of SDD both leads and trails the design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. This SDD trails the design with regard to the description of the system. The description provided in the SDD is a reflection of the results of the design process to date. This SDD addresses the ''Project Requirements Document'' (PRD) (Canori and Leitner 2003 [DIRS 166275]) requirements. Additional PRD requirements may be cited, as applicable, to drive the design of specific aspects of the system, with justifications provided in the basis. Functional and operational requirements applicable to this system are obtained from the ''Project Functional and Operational Requirements'' (F&OR) (Curry 2004 [DIRS 170557]) document. Other requirements to support the design process have been taken from higher-level requirements documents such as the ''Project Design Criteria Document'' (PDC) (BSC 2004 [DIRS 171599]) and the preclosure safety analyses.

  10. IDC System Specification Document Version 1.1.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Lober, Randall R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-02-01

    This document contains the system specifications derived to satisfy the system requirements found in the IDC System Requirements Document for the IDC Reengineering Phase 2 project. Revisions Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Reengineering Project Team Initial delivery M. Harris V1.1 2/2015 IDC Reengineering Project Team Iteration I2 Review Comments M. Harris

  11. 1998 FFTF annual system assessment reports

    International Nuclear Information System (INIS)

    Guttenberg, S.

    1998-01-01

    The health of FFTF systems was assessed assuming a continued facility standby condition. The review was accomplished in accordance with the guidelines of FFTF-EI-083, Plant Evaluation Program. The attached document includes an executive summary of the significant conclusions and assessment reports for each system evaluated

  12. 1998 FFTF annual system assessment reports

    Energy Technology Data Exchange (ETDEWEB)

    Guttenberg, S.

    1998-03-19

    The health of FFTF systems was assessed assuming a continued facility standby condition. The review was accomplished in accordance with the guidelines of FFTF-EI-083, Plant Evaluation Program. The attached document includes an executive summary of the significant conclusions and assessment reports for each system evaluated.

  13. Laboratory Biosafety and Biosecurity Risk Assessment Technical Guidance Document

    Energy Technology Data Exchange (ETDEWEB)

    Astuto-Gribble, Lisa M; Caskey, Susan Adele

    2014-07-01

    The purpose of this document is threefold: 1) to describe the laboratory bio safety and biosecurity risk assessment process and its conceptual framework; 2) provide detailed guidance and suggested methodologies on how to conduct a risk assessment; and 3) present some practical risk assessment process strategies using realistic laboratory scenarios.

  14. A documentation tool for product configuration systems - improving the documentation task

    DEFF Research Database (Denmark)

    Hvam, Lars; Jensen, Klaes Ladeby

    2005-01-01

    's experience with the procedure and the hitherto empirical experience from companies having applied the procedure have revealed that there is a need for an IT-based docu-mentation tool to support the process of constructing product configuration systems. Time can be saved by letting a documentation tool handle......Configuration systems are increasingly applied to automate the configuration of complex products. A configuration system is an expert system designed to combine specified modules according to constraints. The constraints are stored as product data and rules in a product model, and one of the most...... essential tasks is thus to develop a complete and consistent product model which can reflect the actual product. A procedure for building product models has been developed at the Centre for Product Modelling (CPM), and the pro-cedure has been successfully applied in several industrial companies. CPM...

  15. Multiple sclerosis documentation system (MSDS): moving from documentation to management of MS patients.

    Science.gov (United States)

    Ziemssen, Tjalf; Kempcke, Raimar; Eulitz, Marco; Großmann, Lars; Suhrbier, Alexander; Thomas, Katja; Schultheiss, Thorsten

    2013-09-01

    The long disease duration of multiple sclerosis and the increasing therapeutic options require a individualized therapeutic approach which should be carefully documented over years of observation. To switch from MS documentation to an innovative MS management, new computer- and internet-based tools could be implemented as we could demonstrate with the novel computer-based patient management system "multiple sclerosis management system 3D" (MSDS 3D). MSDS 3D allows documentation and management of visit schedules and mandatory examinations via defined study modules by integration of data input from various sources (patients, attending physicians and MS nurses). It provides forms for the documentation of patient visits as well as clinical and diagnostic findings. Information can be collected via interactive touch screens. Specific modules allow the management of highly efficacious treatments as natalizumab or fingolimod. MSDS can be used to transfer the documented data to databases as, e.g. the registry of the German MS society or REGIMS. MSDS has already been implemented successfully in clinical practice and is currently being evaluated in a multicenter setting. High-quality management and documentation are crucial for improvements in clinical practice and research work.

  16. Software System for Vocal Rendering of Printed Documents

    Directory of Open Access Journals (Sweden)

    Marian DARDALA

    2008-01-01

    Full Text Available The objective of this paper is to present a software system architecture developed to render the printed documents in a vocal form. On the other hand, in the paper are described the software solutions that exist as software components and are necessary for documents processing as well as for multimedia device controlling used by the system. The usefulness of this system is for people with visual disabilities that can access the contents of documents without that they be printed in Braille system or to exist in an audio form.

  17. An observational study of the accuracy and completeness of an anesthesia information management system: recommendations for documentation system changes.

    Science.gov (United States)

    Wilbanks, Bryan A; Moss, Jacqueline A; Berner, Eta S

    2013-08-01

    Anesthesia information management systems must often be tailored to fit the environment in which they are implemented. Extensive customization necessitates that systems be analyzed for both accuracy and completeness of documentation design to ensure that the final record is a true representation of practice. The purpose of this study was to determine the accuracy of a recently installed system in the capture of key perianesthesia data. This study used an observational design and was conducted using a convenience sample of nurse anesthetists. Observational data of the nurse anesthetists'delivery of anesthesia care were collected using a touch-screen tablet computer utilizing an Access database customized observational data collection tool. A questionnaire was also administered to these nurse anesthetists to assess perceived accuracy, completeness, and satisfaction with the electronic documentation system. The major sources of data not documented in the system were anesthesiologist presence (20%) and placement of intravenous lines (20%). The major sources of inaccuracies in documentation were gas flow rates (45%), medication administration times (30%), and documentation of neuromuscular function testing (20%)-all of the sources of inaccuracies were related to the use of charting templates that were not altered to reflect the actual interventions performed.

  18. Wind system documentation

    Energy Technology Data Exchange (ETDEWEB)

    Froggatt, J.R.; Tatum, C.P.

    1993-01-15

    Atmospheric transport and diffusion models have been developed by the Environmental Technology Section (ETS) of the Savannah River Technology Center to calculate the location and concentration of toxic or radioactive materials during an accidental release at the Savannah River Site (SRS). The output from these models has been used to support initial on-site and off-site emergency response activities such as protective action decision making and field monitoring coordination. These atmospheric transport and diffusion models have been incorporated into an automated computer-based system called the (Weather Information and Display) System and linked to real-time meteorological and radiological monitoring instruments to provide timely information for these emergency response activities (Hunter, 1990). This report documents various aspects of the WIND system.

  19. Use of an advanced document system in post-refuelling updating of nuclear power plant documentation

    International Nuclear Information System (INIS)

    Puech Suanzes, P.; Cortes Soler, M.

    1993-01-01

    This paper discusses the results of the extensive use of an advanced document system to update documentation prepared by traditional methods and affected by changes in the period between two plant refuellings. The implementation of a system for the capture, retrieval and storage of drawings using optical discs is part of a plan to modernize production and management tools and to thus achieve better control of document configuration. These processes are consequently optimized in that: 1. The deterioration of drawings is detained with the help of an identical, updated, legible, reliable support for all users. 2. The time required to update documentation is reduced. Given the large number of drawings, the implementation method should effectively combine costs and time. The document management tools ensure optical disc storage control so that from the moment a drawing resides in the system, any modification to it is made through the system utilities, thus ensuring quality and reducing schedules. The system described was used to update the electrical drawings of Almaraz Nuclear Power Plant. Changes made during the eighth refuelling of Unit I were incorporated and the time needed to issue the updated drawings was reduced by one month. (author)

  20. Integrated system for automated financial document processing

    Science.gov (United States)

    Hassanein, Khaled S.; Wesolkowski, Slawo; Higgins, Ray; Crabtree, Ralph; Peng, Antai

    1997-02-01

    A system was developed that integrates intelligent document analysis with multiple character/numeral recognition engines in order to achieve high accuracy automated financial document processing. In this system, images are accepted in both their grayscale and binary formats. A document analysis module starts by extracting essential features from the document to help identify its type (e.g. personal check, business check, etc.). These features are also utilized to conduct a full analysis of the image to determine the location of interesting zones such as the courtesy amount and the legal amount. These fields are then made available to several recognition knowledge sources such as courtesy amount recognition engines and legal amount recognition engines through a blackboard architecture. This architecture allows all the available knowledge sources to contribute incrementally and opportunistically to the solution of the given recognition query. Performance results on a test set of machine printed business checks using the integrated system are also reported.

  1. System Documentation AS Basis For Company Business Process Improvement

    OpenAIRE

    Pelawi, Dewan

    2012-01-01

    Business process is an activity performed together to achieve business goals. Good business process will support the achievement of the organization’s plan to make profit for the company. In order to understand the business process, the business process needs to be documented and analyzed. The purpose of research is to make the system documentation as a basis to improve or complete the ongoing business process. The research method is system documentation. System documentation is a way to desc...

  2. Tank waste remediation system functions and requirements document

    Energy Technology Data Exchange (ETDEWEB)

    Carpenter, K.E

    1996-10-03

    This is the Tank Waste Remediation System (TWRS) Functions and Requirements Document derived from the TWRS Technical Baseline. The document consists of several text sections that provide the purpose, scope, background information, and an explanation of how this document assists the application of Systems Engineering to the TWRS. The primary functions identified in the TWRS Functions and Requirements Document are identified in Figure 4.1 (Section 4.0) Currently, this document is part of the overall effort to develop the TWRS Functional Requirements Baseline, and contains the functions and requirements needed to properly define the top three TWRS function levels. TWRS Technical Baseline information (RDD-100 database) included in the appendices of the attached document contain the TWRS functions, requirements, and architecture necessary to define the TWRS Functional Requirements Baseline. Document organization and user directions are provided in the introductory text. This document will continue to be modified during the TWRS life-cycle.

  3. Tank waste remediation system functions and requirements document

    International Nuclear Information System (INIS)

    Carpenter, K.E

    1996-01-01

    This is the Tank Waste Remediation System (TWRS) Functions and Requirements Document derived from the TWRS Technical Baseline. The document consists of several text sections that provide the purpose, scope, background information, and an explanation of how this document assists the application of Systems Engineering to the TWRS. The primary functions identified in the TWRS Functions and Requirements Document are identified in Figure 4.1 (Section 4.0) Currently, this document is part of the overall effort to develop the TWRS Functional Requirements Baseline, and contains the functions and requirements needed to properly define the top three TWRS function levels. TWRS Technical Baseline information (RDD-100 database) included in the appendices of the attached document contain the TWRS functions, requirements, and architecture necessary to define the TWRS Functional Requirements Baseline. Document organization and user directions are provided in the introductory text. This document will continue to be modified during the TWRS life-cycle

  4. Topology of Document Retrieval Systems.

    Science.gov (United States)

    Everett, Daniel M.; Cater, Steven C.

    1992-01-01

    Explains the use of a topological structure to examine the closeness between documents in retrieval systems and analyzes the topological structure of a vector-space model, a fuzzy-set model, an extended Boolean model, a probabilistic model, and a TIRS (Topological Information Retrieval System) model. Proofs for the results are appended. (17…

  5. System design document for the INFLO prototype.

    Science.gov (United States)

    2014-03-01

    This report documents the high level System Design Document (SDD) for the prototype development and : demonstration of the Intelligent Network Flow Optimization (INFLO) application bundle, with a focus on the Speed : Harmonization (SPD-HARM) and Queu...

  6. Testing System Encryption-Decryption Method to RSA Security Documents

    International Nuclear Information System (INIS)

    Supriyono

    2008-01-01

    A model of document protection which was tested as one of the instruments, especially text document. The principle of the document protection was how the system was able to protect the document storage and transfer processes. Firstly, the text-formed document was encrypted; therefore, the document cannot be read for the text was transformed into random letters. The letter-randomized text was then unfolded by the description in order that the document owner was able to read it. In the recent research, the method adopted was RSA method, in which it used complicated mathematics calculation and equipped with initial protection key (with either private key or public key), thus, it was more difficult to be attacked by hackers. The system was developed by using the software of Borland Delphi 7. The results indicated that the system was capable to save and transfer the document, both via internet and intranet in the form of encrypted letter and put it back to the initial form of document by way of description. The research also tested for encrypted and decrypted process for various memory size documents. (author)

  7. 14 CFR 406.113 - Filing documents with the Docket Management System (DMS) and sending documents to the...

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Filing documents with the Docket Management System (DMS) and sending documents to the administrative law judge and Assistant Chief Counsel for... Management System (DMS) and sending documents to the administrative law judge and Assistant Chief Counsel for...

  8. World energy projection system: Model documentation

    Science.gov (United States)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES), provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report.

  9. World energy projection system: Model documentation

    International Nuclear Information System (INIS)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO) (Figure 1). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES) provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report

  10. Document control system as an integral part of RA documentation database application

    International Nuclear Information System (INIS)

    Steljic, M.M; Ljubenov, V.Lj. . E-mail address of corresponding author: milijanas@vin.bg.ac.yu; Steljic, M.M.)

    2005-01-01

    The decision about the final shutdown of the RA research reactor in Vinca Institute has been brought in 2002, and therefore the preparations for its decommissioning have begun. All activities are supervised by the International Atomic Energy Agency (IAEA), which also provides technical and experts' support. This paper describes the document control system is an integral part of the existing RA documentation database. (author)

  11. Transportation system requirements document. Revision 1 DCN01. Supplement

    International Nuclear Information System (INIS)

    1995-05-01

    The original Transportation System Requirements Document described the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of that document was to define the system-level requirements. These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presented an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. This revision of the document contains only the pages that have been modified

  12. Building 894 hazards assessment document

    International Nuclear Information System (INIS)

    Banda, Z.; Williams, M.

    1996-07-01

    The Department of Energy Order 5500.3A requires facility-specific hazards assessments be prepared, maintained, and used for emergency planning purposes. This hazards assessment document describes the chemical and radiological hazards associated with Building 894. The entire inventory was subjected to the screening criteria for potential airborne impact to onsite and offsite individuals out of which 9 chemicals were kept for further evaluation. The air dispersion model, ALOHA, estimated pollutant concentrations downwind from the source of a release, taking into consideration the toxicological and physical characteristics of the release site, the atmospheric conditions, and the circumstances of the release. The greatest distance at which a postulated facility event will produce consequences exceeding the Early Severe Health Effects threshold is 130 meters. The highest emergency classification is a General Emergency. The Emergency Planning Zone is a nominal 130 meter area that conforms to DOE boundaries and physical/jurisdictional boundaries such as fence lines and streets

  13. Building 6630 hazards assessment document

    International Nuclear Information System (INIS)

    Williams, M.; Banda, Z.

    1996-10-01

    The Department of Energy Order 5500.3A requires facility-specific hazards assessments be prepared, maintained, and used for emergency planning purposes. This hazards assessment document describes the chemical and radiological hazards associated with Building 6630. The entire inventory was subjected to the screening criteria for potential airborne impact to onsite and offsite individuals out of which one chemical was kept for further evaluation. The air dispersion model, ALOHA, estimated pollutant concentrations downwind from the source of a release, taking into consideration the toxicological and physical characteristics of the chemical release site, the atmospheric conditions, and the circumstances of the release. The greatest distance at which a postulated facility event will produce consequences exceeding the Early Severe Health Effects threshold is 76 meters. The highest emergency classification is an Alert. The Emergency Planning Zone is a nominal 100 meter area that conforms to DOE boundaries and physical/jurisdictional boundaries such as fence lines and streets

  14. An Intelligent System for Document Retrieval in Distributed Office Environments.

    Science.gov (United States)

    Mukhopadhyay, Uttam; And Others

    1986-01-01

    MINDS (Multiple Intelligent Node Document Servers) is a distributed system of knowledge-based query engines for efficiently retrieving multimedia documents in an office environment of distributed workstations. By learning document distribution patterns and user interests and preferences during system usage, it customizes document retrievals for…

  15. DALIS: a computer-assisted document retrieval system for the FFTF

    International Nuclear Information System (INIS)

    Harves, W.G.

    1981-01-01

    The FFTF (Fast Flux Test Facility) is a liquid sodium cooled, fast flux reactor designed specifically for irradiation testing of fuels and components for liquid metal fast breeder reactors. The Department of Energy and the Nuclear Regulatory Commission require that all pertinent documentation for maintenance, operation, and safety of the FFTF be readily accessible and retrievable, both during initial startup and for the lifetime of the plant. That amounts to a lot of information which has to be retrievable. The indexing system finally developed is called the DALIS system, short for Document and Location Indexing System. This system was designed by an engineer (Michael Theo) for use by engineers. DALIS uses descriptiors and keywords to identify each document in the system. The descriptors give such information as document number, date of issuance of the document, the title, the originating organization, and the microfilm or hardcopy location of the document. The keywords are words or phrases that describe the content of the document and permit retrieval by means of a computer search for documents with the stated keywords

  16. Reconciling disparate information in continuity of care documents: Piloting a system to consolidate structured clinical documents.

    Science.gov (United States)

    Hosseini, Masoud; Jones, Josette; Faiola, Anthony; Vreeman, Daniel J; Wu, Huanmei; Dixon, Brian E

    2017-10-01

    Due to the nature of information generation in health care, clinical documents contain duplicate and sometimes conflicting information. Recent implementation of Health Information Exchange (HIE) mechanisms in which clinical summary documents are exchanged among disparate health care organizations can proliferate duplicate and conflicting information. To reduce information overload, a system to automatically consolidate information across multiple clinical summary documents was developed for an HIE network. The system receives any number of Continuity of Care Documents (CCDs) and outputs a single, consolidated record. To test the system, a randomly sampled corpus of 522 CCDs representing 50 unique patients was extracted from a large HIE network. The automated methods were compared to manual consolidation of information for three key sections of the CCD: problems, allergies, and medications. Manual consolidation of 11,631 entries was completed in approximately 150h. The same data were automatically consolidated in 3.3min. The system successfully consolidated 99.1% of problems, 87.0% of allergies, and 91.7% of medications. Almost all of the inaccuracies were caused by issues involving the use of standardized terminologies within the documents to represent individual information entries. This study represents a novel, tested tool for de-duplication and consolidation of CDA documents, which is a major step toward improving information access and the interoperability among information systems. While more work is necessary, automated systems like the one evaluated in this study will be necessary to meet the informatics needs of providers and health systems in the future. Copyright © 2017 Elsevier Inc. All rights reserved.

  17. Regulatory systems-based licensing guidance documentation

    International Nuclear Information System (INIS)

    Delligatti, M.S.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) has developed a series of licensing guidance documents based on the regulatory requirements in Part 60 of Title 10 of the Code of Federal Regulations (10 CFR Part 60). This regulatory systems-based approach to licensing guidance documentation relies on the definition of the high-level waste repository in 10 CFR Part 60. A document which is important for the frame-work it gives to other programmatic licensing guidance is the Draft Regulatory Guide open-quotes Format and Content for the License Application for the High-Level Waste Repositoryclose quotes (FCRG). The FCRG describes a format and content acceptable to NRC for a high-level waste repository license application pursuant to the requirements of 10 CFR Part 60. Other licensing guidance documents will be compatible with the FCRG

  18. Classification process in a text document recommender system

    Directory of Open Access Journals (Sweden)

    Dan MUNTEANU

    2005-12-01

    Full Text Available This paper presents the classification process in a recommender system used for textual documents taken especially from web. The system uses in the classification process a combination of content filters, event filters and collaborative filters and it uses implicit and explicit feedback for evaluating documents.

  19. Monitored Retrievable Storage System Requirements Document

    International Nuclear Information System (INIS)

    1994-03-01

    This Monitored Retrievable Storage System Requirements Document (MRS-SRD) describes the functions to be performed and technical requirements for a Monitored Retrievable Storage (MRS) facility subelement and the On-Site Transfer and Storage (OSTS) subelement. The MRS facility subelement provides for temporary storage, at a Civilian Radioactive Waste Management System (CRWMS) operated site, of spent nuclear fuel (SNF) contained in an NRC-approved Multi-Purpose Canister (MPC) storage mode, or other NRC-approved storage modes. The OSTS subelement provides for transfer and storage, at Purchaser sites, of spent nuclear fuel (SNF) contained in MPCs. Both the MRS facility subelement and the OSTS subelement are in support of the CRWMS. The purpose of the MRS-SRD is to define the top-level requirements for the development of the MRS facility and the OSTS. These requirements include design, operation, and decommissioning requirements to the extent they impact on the physical development of the MRS facility and the OSTS. The document also presents an overall description of the MRS facility and the OSTS, their functions (derived by extending the functional analysis documented by the Physical System Requirements (PSR) Store Waste Document), their segments, and the requirements allocated to the segments. In addition, the top-level interface requirements of the MRS facility and the OSTS are included. As such, the MRS-SRD provides the technical baseline for the MRS Safety Analysis Report (SAR) design and the OSTS Safety Analysis Report design

  20. ARCHITECTURE SOFTWARE SOLUTION TO SUPPORT AND DOCUMENT MANAGEMENT QUALITY SYSTEM

    Directory of Open Access Journals (Sweden)

    Milan Eric

    2010-12-01

    Full Text Available One of the basis of a series of standards JUS ISO 9000 is quality system documentation. An architecture of the quality system documentation depends on the complexity of business system. An establishment of an efficient management documentation of system of quality is of a great importance for the business system, as well as in the phase of introducing the quality system and in further stages of its improvement. The study describes the architecture and capability of software solutions to support and manage the quality system documentation in accordance with the requirements of standards ISO 9001:2001, ISO 14001:2005 HACCP etc.

  1. Quality control of the documentation process in electronic economic activities

    Directory of Open Access Journals (Sweden)

    Krutova A.S.

    2017-06-01

    Full Text Available It is proved that the main tool that will provide adequate information resources e economic activities of social and economic relations are documenting quality control processes as the basis of global information space. Directions problems as formation evaluation information resources in the process of documentation, namely development tools assess the efficiency of the system components – qualitative assessment; development of mathematical modeling tools – quantitative evaluation. A qualitative assessment of electronic documentation of economic activity through exercise performance, efficiency of communication; document management efficiency; effectiveness of flow control operations; relationship management effectiveness. The concept of quality control process documents electronically economic activity to components which include: the level of workflow; forms adequacy of information; consumer quality documents; quality attributes; type of income data; condition monitoring systems; organizational level process documentation; attributes of quality, performance quality consumer; type of management system; type of income data; condition monitoring systems. Grounded components of the control system electronic document subjects of economic activity. Detected components IT-audit management system economic activity: compliance audit; audit of internal control; detailed multilevel analysis; corporate risk assessment methodology. The stages and methods of processing electronic transactions economic activity during condition monitoring of electronic economic activity.

  2. A document preparation system in a large network environment

    Energy Technology Data Exchange (ETDEWEB)

    Vigil, M.; Bouchier, S.; Sanders, C.; Sydoriak, S.; Wheeler, K.

    1988-01-01

    At Los Alamos National Laboratory, we have developed an integrated document preparation system that produces publication-quality documents. This system combines text formatters and computer graphics capabilities that have been adapted to meet the needs of users in a large scientific research laboratory. This paper describes the integration of document processing technology to develop a system architecture, based on a page description language, to provide network-wide capabilities in a distributed computing environment. We describe the Laboratory requirements, the integration and implementation issues, and the challenges we faced developing this system.

  3. Assessment of LANL beryllium waste management documentation

    International Nuclear Information System (INIS)

    Danna, J.G.; Jennrich, E.A.; Lund, D.M.; Davis, K.D.; Hoevemeyer, S.S.

    1991-04-01

    The objective of this report is to determine present status of the preparation and implementation of the various high priority documents required to properly manage the beryllium waste generated at the Laboratory. The documents being assessed are: Waste Acceptance Criteria, Waste Characterization Plan, Waste Certification Plan, Waste Acceptance Procedures, Waste Characterization Procedures, Waste Certification Procedures, Waste Training Procedures and Waste Recordkeeping Procedures. Beryllium is regulated (as a dust) under 40 CFR 261.33 as ''Discarded commercial chemical products, off specification species, container residues and spill residues thereof.'' Beryllium is also identified in the 3rd thirds ruling of June 1, 1990 as being restricted from land disposal (as a dust). The beryllium waste generated at the Laboratory is handled separately because beryllium has been identified as a highly toxic carcinogenic material

  4. A documentation system for decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Glock, H.J.; Mueller, F.; Schwarz, H.

    1984-01-01

    A NPP's life cycle from the beginning of planning to its complete dismantling will last about 80 to 100 years. For this long time a documentation system has to be kept in stable working condition which provides access to an information base including 1.5 to 2 million pages and 200 to 250 thousand engineering drawings. As an appropriate base the documentation system IFODOK is proposed which is supported by computer and data base management software. In cooperation with NPP operating people a ground level thesaurus has been developed which is structured according to the rules of INFODOK's documentation language. The form of the information units which INFODOK maintains has been adapted to the requirements of KKW documentation and the related data record is described. Within a layer model the requirements to the software resulting from the demanded performance of the system are explained. The model also describes the interfaces between the substantial system components (application programs, data base management system, operating system) as well as within the different layers. The requirements which the system's hardware has to meet are described functionally and quantitatively in details. The application program' components have been extended by some functions. An automatic microfilm storage and retrieval system which may be integrated to the overall system and coupled to the computer by an interface is specified. The organization of the computer assisted documentation process including the required backup and refreshment procedures is described in its basic characteristics. This description of an DP system's prototype presents the base for the application of INFODOK to the documentation of NPP's information bases during their whole life time

  5. Waste Management System Description Document (WMSD)

    International Nuclear Information System (INIS)

    1992-02-01

    This report is an appendix of the ''Waste Management Description Project, Revision 1''. This appendix is about the interim approach for the technical baseline of the waste management system. It describes the documentation and regulations of the waste management system requirements and description. (MB)

  6. Daily Encounter Cards-Evaluating the Quality of Documented Assessments.

    Science.gov (United States)

    Cheung, Warren J; Dudek, Nancy; Wood, Timothy J; Frank, Jason R

    2016-10-01

    Concerns over the quality of work-based assessment (WBA) completion has resulted in faculty development and rater training initiatives. Daily encounter cards (DECs) are a common form of WBA used in ambulatory care and shift work settings. A tool is needed to evaluate initiatives aimed at improving the quality of completion of this widely used form of WBA. The completed clinical evaluation report rating (CCERR) was designed to provide a measure of the quality of documented assessments on in-training evaluation reports. The purpose of this study was to provide validity evidence to support using the CCERR to assess the quality of DEC completion. Six experts in resident assessment grouped 60 DECs into 3 quality categories (high, average, and poor) based on how informative each DEC was for reporting judgments of the resident's performance. Eight supervisors (blinded to the expert groupings) scored the 10 most representative DECs in each group using the CCERR. Mean scores were compared to determine if the CCERR could discriminate based on DEC quality. Statistically significant differences in CCERR scores were observed between all quality groups ( P  evaluate DEC quality. It can serve as an outcome measure for studying interventions targeted at improving the quality of assessments documented on DECs.

  7. Rancang Bangun Document Management System Untuk Mengelola Dokumen Standart Operational Procedure

    Directory of Open Access Journals (Sweden)

    I Putu Susila Handika

    2017-09-01

    Standard Operational Procedure (SOP is one important document in a company because it is useful to improve the quality of the company. PT. Global Retailindo Pratama is one of the companies engaged in retail that using standard of quality management ISO 9001: 2008. Currently the management of SOP documents at PT. Global Retailindo Pratama still use manual way. Manual way cause some problems such as the search process and document distribution process takes quite a long time. This research aims to design and build Document Management System to manage SOP documents. The system development model used in this research is prototyping model. This application is built in web-based with PHP as programming language. Testing the application using Blak Box Testing and Usability Testing shows that the Document Management System can run in accordance with the needs and can be used easily so that the process of document management SOP becomes faster. Keywords: Document Management System, Standart Operational Procedure, Information System, PHP.

  8. General Controls Over the Electronic Document Access System

    National Research Council Canada - National Science Library

    2000-01-01

    ...) system as part of the DoD Paper-Free Contracting Initiative. EDA contributes to the initiative by digitizing paper documents and offering web-based read-only access to official contracting, finance and accounting documents...

  9. An Introduction to the Nuclear Document Crawling System

    International Nuclear Information System (INIS)

    Tae, Jae Woong; Yoon, Sung Ho; Shin, Dong Hoon

    2016-01-01

    The NSG(Nuclear Suppliers Group) guidelines state that controls on 'technology' transfer do not apply to information 'in the public domain' or to 'basic scientific research'. According to the guidelines, 'basic scientific research' is an experimental or theoretical work undertaken principally to acquire new knowledge of the fundamental principles of phenomena and observable facts, not primarily directed towards a specific practical aim or objective. 'Technology in the public domain' means 'technology' or 'software' that has been made available without restrictions upon its further dissemination. It is a difficult problem to determine whether a document is in the public domain or it is a basic scientific research because its criteria are ambiguous and unclear. In this paper, we introduce an approach using documents on the web and a system to manage electronic documents on the web. In this paper, we proposed an approach to determine whether a document is open to public or it is a basic scientific research and we developed the document crawling system to collect open documents on the web. We can take open documents into a review process in a new way. It supports to prevent reviewers from classifying an open document into a strategic technology. It is expected to improve reliability of classification results

  10. An Introduction to the Nuclear Document Crawling System

    Energy Technology Data Exchange (ETDEWEB)

    Tae, Jae Woong; Yoon, Sung Ho; Shin, Dong Hoon [Korea Institute of Nuclear Nonproliferation and Control, Daejeon (Korea, Republic of)

    2016-05-15

    The NSG(Nuclear Suppliers Group) guidelines state that controls on 'technology' transfer do not apply to information 'in the public domain' or to 'basic scientific research'. According to the guidelines, 'basic scientific research' is an experimental or theoretical work undertaken principally to acquire new knowledge of the fundamental principles of phenomena and observable facts, not primarily directed towards a specific practical aim or objective. 'Technology in the public domain' means 'technology' or 'software' that has been made available without restrictions upon its further dissemination. It is a difficult problem to determine whether a document is in the public domain or it is a basic scientific research because its criteria are ambiguous and unclear. In this paper, we introduce an approach using documents on the web and a system to manage electronic documents on the web. In this paper, we proposed an approach to determine whether a document is open to public or it is a basic scientific research and we developed the document crawling system to collect open documents on the web. We can take open documents into a review process in a new way. It supports to prevent reviewers from classifying an open document into a strategic technology. It is expected to improve reliability of classification results.

  11. Advanced Materials Laboratory hazards assessment document

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, B.; Banda, Z.

    1995-10-01

    The Department of Energy Order 55OO.3A requires facility-specific hazards assessments be prepared, maintained, and used for emergency planning purposes. This hazards assessment document describes the chemical and radiological hazards associated with the AML. The entire inventory was screened according to the potential airborne impact to onsite and offsite individuals. The air dispersion model, ALOHA, estimated pollutant concentrations downwind from the source of a release, taking into consideration the toxicological and physical characteristics of the release site, the atmospheric conditions, and the circumstances of the release. The greatest distance at which a postulated facility event will produce consequences exceeding the Early Severe Health Effects threshold is 23 meters. The highest emergency classification is a General Emergency. The Emergency Planning Zone is a nominal area that conforms to DOE boundaries and physical/jurisdictional boundaries such as fence lines and streets.

  12. BASIC Instructional Program: System Documentation.

    Science.gov (United States)

    Dageforde, Mary L.

    This report documents the BASIC Instructional Program (BIP), a "hands-on laboratory" that teaches elementary programming in the BASIC language, as implemented in the MAINSAIL language, a machine-independent revision of SAIL which should facilitate implementation of BIP on other computing systems. Eight instructional modules which make up…

  13. Integration of electronic document management system with other systems in a company

    OpenAIRE

    Pintar, Matej

    2016-01-01

    This master's thesis presents specific model of integration between electronic document management system and other systems in a medium-sized company in Slovenia. The introduction part of the thesis begins with theoretical basis of the research, which is the integration of computer systems. The introduction part is folowed by presentation of a concrete electronic document management system EBA DMS. Central part of the master's thesis presents different methods of integration of electronic doc...

  14. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  15. 296-B-5 Stack monitoring and sampling system annual system assessment report

    International Nuclear Information System (INIS)

    Ridge, T.M.

    1995-02-01

    The B Plant Administration Manual requires an annual system assessment to evaluate and report the present condition of the sampling and monitoring system associated with Stack 296-B-5 at B Plant. The sampling and monitoring system associated with stack 296-B-5 is functional and performing satisfactorily. This document is an annual assessment report of the systems associated with the 296-B-5 stack

  16. Three-dimensional measurement system for crime scene documentation

    Science.gov (United States)

    Adamczyk, Marcin; Hołowko, Elwira; Lech, Krzysztof; Michoński, Jakub; MÄ czkowski, Grzegorz; Bolewicki, Paweł; Januszkiewicz, Kamil; Sitnik, Robert

    2017-10-01

    Three dimensional measurements (such as photogrammetry, Time of Flight, Structure from Motion or Structured Light techniques) are becoming a standard in the crime scene documentation process. The usage of 3D measurement techniques provide an opportunity to prepare more insightful investigation and helps to show every trace in the context of the entire crime scene. In this paper we would like to present a hierarchical, three-dimensional measurement system that is designed for crime scenes documentation process. Our system reflects the actual standards in crime scene documentation process - it is designed to perform measurement in two stages. First stage of documentation, the most general, is prepared with a scanner with relatively low spatial resolution but also big measuring volume - it is used for the whole scene documentation. Second stage is much more detailed: high resolution but smaller size of measuring volume for areas that required more detailed approach. The documentation process is supervised by a specialised application CrimeView3D, that is a software platform for measurements management (connecting with scanners and carrying out measurements, automatic or semi-automatic data registration in the real time) and data visualisation (3D visualisation of documented scenes). It also provides a series of useful tools for forensic technicians: virtual measuring tape, searching for sources of blood spatter, virtual walk on the crime scene and many others. In this paper we present our measuring system and the developed software. We also provide an outcome from research on metrological validation of scanners that was performed according to VDI/VDE standard. We present a CrimeView3D - a software-platform that was developed to manage the crime scene documentation process. We also present an outcome from measurement sessions that were conducted on real crime scenes with cooperation with Technicians from Central Forensic Laboratory of Police.

  17. Ways to integrate document management systems with industrial plant configuration management systems

    International Nuclear Information System (INIS)

    Munoz, M.

    1995-01-01

    Based on experience gained from tasks carried out for Almaraz Nuclear Power Plant, this paper describes computer platforms used both at the power plant and in the main offices of the engineering company. Subsequently, a description is given of the procedure followed for the continuous up-dating of plant documentation, in order to maintain consistency with other information stored in data bases in the Operation Management System, Maintenance System, Modification Management System, etc. The work method used for the unitary updating of all information (document images and attributes corresponding to the different data bases), following refuelling procedures is also described. Lastly, the paper describes the functions and the user interface of the system used in the power plant for document management. (Author)

  18. [Support of the nursing process through electronic nursing documentation systems (UEPD) – Initial validation of an instrument].

    Science.gov (United States)

    Hediger, Hannele; Müller-Staub, Maria; Petry, Heidi

    2016-01-01

    Electronic nursing documentation systems, with standardized nursing terminology, are IT-based systems for recording the nursing processes. These systems have the potential to improve the documentation of the nursing process and to support nurses in care delivery. This article describes the development and initial validation of an instrument (known by its German acronym UEPD) to measure the subjectively-perceived benefits of an electronic nursing documentation system in care delivery. The validity of the UEPD was examined by means of an evaluation study carried out in an acute care hospital (n = 94 nurses) in German-speaking Switzerland. Construct validity was analyzed by principal components analysis. Initial references of validity of the UEPD could be verified. The analysis showed a stable four factor model (FS = 0.89) scoring in 25 items. All factors loaded ≥ 0.50 and the scales demonstrated high internal consistency (Cronbach's α = 0.73 – 0.90). Principal component analysis revealed four dimensions of support: establishing nursing diagnosis and goals; recording a case history/an assessment and documenting the nursing process; implementation and evaluation as well as information exchange. Further testing with larger control samples and with different electronic documentation systems are needed. Another potential direction would be to employ the UEPD in a comparison of various electronic documentation systems.

  19. Corral Monitoring System assessment results

    International Nuclear Information System (INIS)

    Filby, E.E.; Haskel, K.J.

    1998-03-01

    This report describes the results of a functional and operational assessment of the Corral Monitoring Systems (CMS), which was designed to detect and document accountable items entering or leaving a monitored site. Its development was motivated by the possibility that multiple sites in the nuclear weapons states of the former Soviet Union might be opened to such monitoring under the provisions of the Strategic Arms Reduction Treaty. The assessment was performed at three levels. One level evaluated how well the planned approach addressed the target application, and which involved tracking sensitive items moving into and around a site being monitored as part of an international treaty or other agreement. The second level examined the overall design and development approach, while the third focused on individual subsystems within the total package. Unfortunately, the system was delivered as disassembled parts and pieces, with very poor documentation. Thus, the assessment was based on fragmentary operating data coupled with an analysis of what documents were provided with the system. The system design seemed to be a reasonable match to the requirements of the target application; however, important questions about site manning and top level administrative control were left unanswered. Four weaknesses in the overall design and development approach were detected: (1) poor configuration control and management, (2) inadequate adherence to a well defined architectural standard, (3) no apparent provision for improving top level error tolerance, and (4) weaknesses in the object oriented programming approach. The individual subsystems were found to offer few features or capabilities that were new or unique, even at the conceptual level. The CMS might possibly have offered a unique combination of features, but this level of integration was never realized, and it had no unique capabilities that could be readily extracted for use in another system

  20. Corral Monitoring System assessment results

    Energy Technology Data Exchange (ETDEWEB)

    Filby, E.E.; Haskel, K.J.

    1998-03-01

    This report describes the results of a functional and operational assessment of the Corral Monitoring Systems (CMS), which was designed to detect and document accountable items entering or leaving a monitored site. Its development was motivated by the possibility that multiple sites in the nuclear weapons states of the former Soviet Union might be opened to such monitoring under the provisions of the Strategic Arms Reduction Treaty. The assessment was performed at three levels. One level evaluated how well the planned approach addressed the target application, and which involved tracking sensitive items moving into and around a site being monitored as part of an international treaty or other agreement. The second level examined the overall design and development approach, while the third focused on individual subsystems within the total package. Unfortunately, the system was delivered as disassembled parts and pieces, with very poor documentation. Thus, the assessment was based on fragmentary operating data coupled with an analysis of what documents were provided with the system. The system design seemed to be a reasonable match to the requirements of the target application; however, important questions about site manning and top level administrative control were left unanswered. Four weaknesses in the overall design and development approach were detected: (1) poor configuration control and management, (2) inadequate adherence to a well defined architectural standard, (3) no apparent provision for improving top level error tolerance, and (4) weaknesses in the object oriented programming approach. The individual subsystems were found to offer few features or capabilities that were new or unique, even at the conceptual level. The CMS might possibly have offered a unique combination of features, but this level of integration was never realized, and it had no unique capabilities that could be readily extracted for use in another system.

  1. Lawrence Livermore National Laboratory Emergency Response Capability Baseline Needs Assessment Requirement Document

    Energy Technology Data Exchange (ETDEWEB)

    Sharry, J A

    2009-12-30

    This revision of the LLNL Fire Protection Baseline Needs Assessment (BNA) was prepared by John A. Sharry, LLNL Fire Marshal and LLNL Division Leader for Fire Protection and reviewed by Martin Gresho, Sandia/CA Fire Marshal. The document follows and expands upon the format and contents of the DOE Model Fire Protection Baseline Capabilities Assessment document contained on the DOE Fire Protection Web Site, but only address emergency response. The original LLNL BNA was created on April 23, 1997 as a means of collecting all requirements concerning emergency response capabilities at LLNL (including response to emergencies at Sandia/CA) into one BNA document. The original BNA documented the basis for emergency response, emergency personnel staffing, and emergency response equipment over the years. The BNA has been updated and reissued five times since in 1998, 1999, 2000, 2002, and 2004. A significant format change was performed in the 2004 update of the BNA in that it was 'zero based.' Starting with the requirement documents, the 2004 BNA evaluated the requirements, and determined minimum needs without regard to previous evaluations. This 2010 update maintains the same basic format and requirements as the 2004 BNA. In this 2010 BNA, as in the previous BNA, the document has been intentionally divided into two separate documents - the needs assessment (1) and the compliance assessment (2). The needs assessment will be referred to as the BNA and the compliance assessment will be referred to as the BNA Compliance Assessment. The primary driver for separation is that the needs assessment identifies the detailed applicable regulations (primarily NFPA Standards) for emergency response capabilities based on the hazards present at LLNL and Sandia/CA and the geographical location of the facilities. The needs assessment also identifies areas where the modification of the requirements in the applicable NFPA standards is appropriate, due to the improved fire protection

  2. An Automated System for the Maintenance of Multiform Documentation

    Science.gov (United States)

    Rousseau, Bertrand; Ruggier, Mario; Smith, Matthiew

    Software documentation for the user often exists in several forms including paper, electronic, on-line help, etc. We have build a system to help with the writing and maintenance of such kinds of documentation which relies on the FrameMaker product. As an example, we show how it is used to maintain the ADAMO documentation, delivered in 4 incarnations on paper, WWW hypertext, KUIP and running examples. The use of the system results in both time saving and quality improvements.

  3. Total System Performance Assessment-License Application Methods and Approach

    Energy Technology Data Exchange (ETDEWEB)

    J. McNeish

    2002-09-13

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issue (KTI) agreements, the ''Yucca Mountain Review Plan'' (CNWRA 2002 [158449]), and 10 CFR Part 63. This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are utilized in this document.

  4. Continuous Release-Emergency Response Notification System and Priority Assessment Model: Model documentation

    International Nuclear Information System (INIS)

    1991-01-01

    The purpose of the model documentation is to provide a detailed description of the modeling and risk analysis procedures used in CR-ERNS/PAM to assist OSCs and other Superfund decision-makers in interpreting the system results. PAM is a screening-level model; to properly interpret PAM's outputs, the user must understand the limitations and uncertainties in the equations and data used to generate these results. Chapter 2 presents the system's fate and transport models and describes the assumptions associated with these equations. Chapter 3 describes PAM's auxiliary data bases and provides the source(s) of each parameter and the methods by which values were selected. Chapter 4 explains the methods and exposure assumptions used to estimate exposures to hazardous substances and to evaluate the risks and hazards associated with these exposures. Chapter 5 presents examples of reports generated by PAM and explains the meaning of the 'flags' assigned to hazardous substances, media, and facilities. Appendix A contains versions of the fate and transport equations used for radionuclides. Appendix B contains copies of PAM's reports

  5. Civilian Radioactive Waste Management System Requirements Document (CRP)

    International Nuclear Information System (INIS)

    C.A. Kouts

    2006-01-01

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible for design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further

  6. [Multiple sclerosis management system 3D. Moving from documentation towards management of patients].

    Science.gov (United States)

    Schultheiss, T; Kempcke, R; Kratzsch, F; Eulitz, M; Pette, M; Reichmann, H; Ziemssen, T

    2012-04-01

    The increasing therapeutic options for relapsing-remitting multiple sclerosis require a specific treatment and risk management to recognize the individual response as well as potential side effects. To switch from pure MS documentation to MS management by implementing a new multiple sclerosis management and documentation tool may be of importance. This article presents the novel computer-based patient management system "multiple sclerosis management system 3D" (MSDS 3D). MSDS 3D allows documentation and visualization of visit schedules and mandatory examinations via defined study modules by integration of data input from patients, attending physicians and MS nurses. It provides forms for the documentation of patient visits as well as clinical and diagnostic findings. Information is collected via interactive touch screens. A specific module which is part of MSDS 3D's current version allows the monthly monitoring of patients under treatment with natalizumab. A checklist covering clinical signs of progressive multifocal leukoencephalopathy (PML) and a detailed questionnaire about the handling of natalizumab in practice have additionally been added. The MS patient management system MSDS 3D has successfully been implemented and is currently being evaluated in a multi-centre setting. Advanced assessment of patient data may allow improvements in clinical practice and research work. The addition of a checklist and a questionnaire into the natalizumab module may support the recognition of PML during its early, treatable course.

  7. INFORMATION SYSTEM OF AUTOMATION OF PREPARATION EDUCATIONAL PROCESS DOCUMENTS

    Directory of Open Access Journals (Sweden)

    V. A. Matyushenko

    2016-01-01

    Full Text Available Information technology is rapidly conquering the world, permeating all spheres of human activity. Education is not an exception. An important direction of information of education is the development of university management systems. Modern information systems improve and facilitate the management of all types of activities of the institution. The purpose of this paper is development of system, which allows automating process of formation of accounting documents. The article describes the problem of preparation of the educational process documents. Decided to project and create the information system in Microsoft Access environment. The result is four types of reports obtained by using the developed system. The use of this system now allows you to automate the process and reduce the effort required to prepare accounting documents. All reports was implement in Microsoft Excel software product and can be used for further analysis and processing.

  8. Development of digital library system on regulatory documents for nuclear power plants

    International Nuclear Information System (INIS)

    Lee, K. H.; Kim, K. J.; Yoon, Y. H.; Kim, M. W.; Lee, J. I.

    2001-01-01

    The main objective of this study is to establish nuclear regulatory document retrieval system based on internet. With the advancement of internet and information processing technology, information management patterns are going through a new paradigm. Getting along the current of the time, it is general tendency to transfer paper-type documents into electronic-type documents through document scanning and indexing. This system consists of nuclear regulatory documents, nuclear safety documents, digital library, and information system with index and full text

  9. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  10. An electronic regulatory document management system for a clinical trial network.

    Science.gov (United States)

    Zhao, Wenle; Durkalski, Valerie; Pauls, Keith; Dillon, Catherine; Kim, Jaemyung; Kolk, Deneil; Silbergleit, Robert; Stevenson, Valerie; Palesch, Yuko

    2010-01-01

    A computerized regulatory document management system has been developed as a module in a comprehensive Clinical Trial Management System (CTMS) designed for an NIH-funded clinical trial network in order to more efficiently manage and track regulatory compliance. Within the network, several institutions and investigators are involved in multiple trials, and each trial has regulatory document requirements. Some of these documents are trial specific while others apply across multiple trials. The latter causes a possible redundancy in document collection and management. To address these and other related challenges, a central regulatory document management system was designed. This manuscript shares the design of the system as well as examples of it use in current studies. Copyright (c) 2009 Elsevier Inc. All rights reserved.

  11. Daily Encounter Cards—Evaluating the Quality of Documented Assessments

    Science.gov (United States)

    Cheung, Warren J.; Dudek, Nancy; Wood, Timothy J.; Frank, Jason R.

    2016-01-01

    ABSTRACT Background  Concerns over the quality of work-based assessment (WBA) completion has resulted in faculty development and rater training initiatives. Daily encounter cards (DECs) are a common form of WBA used in ambulatory care and shift work settings. A tool is needed to evaluate initiatives aimed at improving the quality of completion of this widely used form of WBA. Objective  The completed clinical evaluation report rating (CCERR) was designed to provide a measure of the quality of documented assessments on in-training evaluation reports. The purpose of this study was to provide validity evidence to support using the CCERR to assess the quality of DEC completion. Methods  Six experts in resident assessment grouped 60 DECs into 3 quality categories (high, average, and poor) based on how informative each DEC was for reporting judgments of the resident's performance. Eight supervisors (blinded to the expert groupings) scored the 10 most representative DECs in each group using the CCERR. Mean scores were compared to determine if the CCERR could discriminate based on DEC quality. Results  Statistically significant differences in CCERR scores were observed between all quality groups (P < .001). A generalizability analysis demonstrated the majority of score variation was due to differences in DECs. The reliability with a single rater was 0.95. Conclusions  The CCERR is a reliable and valid tool to evaluate DEC quality. It can serve as an outcome measure for studying interventions targeted at improving the quality of assessments documented on DECs. PMID:27777675

  12. Bioburden assessment and gamma radiation inactivation patterns in parchment documents

    International Nuclear Information System (INIS)

    Nunes, Inês; Mesquita, Nuno; Cabo Verde, Sandra; Carolino, Maria Manuela; Portugal, António; Botelho, Maria Luísa

    2013-01-01

    Parchment documents are part of our cultural heritage and, as historical artifacts that they are, should be preserved. The aim of this study was to validate an appropriate methodology to characterize the bioburden of parchment documents, and to assess the growth and gamma radiation inactivation patterns of the microbiota present in that material. Another goal was to estimate the minimum gamma radiation dose (D min ) to be applied for the decontamination of parchment as an alternative treatment to the current toxic chemical and non-chemical decontamination methods. Two bioburden assessment methodologies were evaluated: the Swab Method (SM) and the Destructive Method (DM). The recovery efficiency of each method was estimated by artificial contamination, using a Cladosporium cladosporioides spore suspension. The parchment samples' microbiota was typified using morphological methods and the fungal isolates were identified by ITS-DNA sequencing. The inactivation pattern was assessed using the DM after exposure to different gamma radiation doses, and using C. cladosporioides as reference. Based on the applied methodology, parchment samples presented bioburden values lower than 5×10 3 CFU/cm 2 for total microbiota, and lower than 10 CFU/cm 2 for fungal propagules. The results suggest no evident inactivation trend for the natural parchment microbiota, especially regarding the fungal community. A minimum gamma radiation dose (D min ) of 5 kGy is proposed for the decontamination treatment of parchment. Determining the minimal decontamination dose in parchment is essential for a correct application of gamma radiation as an alternative decontamination treatment for this type of documents avoiding the toxicity and the degradation promoted by the traditional chemical and non-chemical treatments. - Highlights: • Characterization of the microbial population of parchment documents. • Study the inactivation pattern of parchment microbiota by gamma radiation. • Assessment of

  13. Total System Performance Assessment - License Application Methods and Approach

    International Nuclear Information System (INIS)

    McNeish, J.

    2003-01-01

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document

  14. Preparation of plant and system design description documents

    International Nuclear Information System (INIS)

    1989-01-01

    This standard prescribes the purpose, scope, organization, and content of plant design requirements (PDR) documents and system design descriptions (SDDs), to provide a unified approach to their preparation and use by a project as the principal means to establish the plant design requirements and to establish, describe, and control the individual system designs from conception and throughout the lifetime of the plant. The Electric Power Research Institute's Advanced Light Water Reactor (LWR) Requirements Document should be considered for LWR plants

  15. The System 80+ Standard Plant design control document. Volume 23

    International Nuclear Information System (INIS)

    1997-01-01

    This Design Control Document (DCD) is a repository of information comprising the System 80+trademark Standard Plant Design. The DCD also provides that design-related information to be incorporated by reference in the design certification rule for the System 80+ Standard Plant Design. Applicants for a combined license pursuant to 10 CFR 52 must ensure that the final Design Certification Rule and the associated Statements of Consideration are used when making all licensing decisions relevant to the System 80+ Standard Plant Design. The Design Control Document contains the DCD introduction, The Certified Design Material (CDM) [i.e., ''Tier 1''] and the Approved Design Material (ADM) [i.e., ''Tier 2''] for the System 80+ Standard Plant Design. The CDM includes the following sections: (1) Introductory material; (2) Certified Design Material for System 80+ systems and structures; (3) Certified Design Material for non-system-based aspects of the System 80+ Certified design; (4) Interface requirements; and (5) Site parameters. The ADM, to the extent applicable for the System 80+ Standard Plant Design, includes: (1) the information required for the final safety analysis report under 20 CFR 50.34; (2) other relevant information required by 10 CFR 52.47; and (3) emergency operations guidelines. This volume contains part 16 References and Appendix 19 A Design Alternatives for section 19 (Probabilistic Risk Assessment) of the ADM Design and Analysis. Also covered is section 20 Unresolved Safety Issues of the ADM Design and Analysis. Finally sections 1--6 of the ADM Emergency Operations Guidelines are contained in this volume. Information covered in these sections include: standard post-trip actions; diagnostic actions; reactor trip recovery guideline; LOCA recovery; SG tube rupture recovery

  16. Assessment of effectiveness of geologic isolation systems. CIRMIS data system. Volume 1. Initialization, operation, and documentation

    International Nuclear Information System (INIS)

    Friedrichs, D.R.

    1980-01-01

    The Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) Program is developing and applying the methodology for assessing the far-field, long-term post-closure safety of deep geologic nuclear waste repositories. AEGIS is being performed by Pacific Northwest Laboratory (PNL) under contract with the Office of Nuclear Waste Isolation (ONWI) for the Department of Energy (DOE). One task within AEGIS is the development of methodology for analysis of the consequences (water pathway) from loss of repository containment as defined by various release scenarios. The various input parameters required in the analysis are compiled in data systems. The data are organized and prepared by various input subroutines for use by the hydrologic and transport codes. The hydrologic models simulate the groundwater flow systems and provide water flow directions, rates, and velocities as inputs to the transport models. Outputs from the transport models are basically graphs of radionuclide concentration in the groundwater plotted against time. After dilution in the receiving surface-water body (e.g., lake, river, bay), these data are the input source terms for the dose models, if dose assessments are required. The dose models calculate radiation dose to individuals and populations. CIRMIS (Comprehensive Information Retrieval and Model Input Sequence) Data System, a storage and retrieval system for model input and output data, including graphical interpretation and display is described. This is the first of four volumes of the description of the CIRMIS Data System

  17. IDC Re-Engineering Phase 2 System Specification Document Version 1.5

    Energy Technology Data Exchange (ETDEWEB)

    Satpathi, Meara Allena [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Burns, John F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    This document contains the system specifications derived to satisfy the system requirements found in the IDC System Requirements Document for the IDC Re-Engineering Phase 2 project. This System Specification Document (SSD) defines waveform data processing requirements for the International Data Centre (IDC) of the Comprehensive Nuclear Test Ban Treaty Organization (CTBTO). The routine processing includes characterization of events with the objective of screening out events considered to be consistent with natural phenomena or non-nuclear, man-made phenomena. This document does not address requirements concerning acquisition, processing and analysis of radionuclide data but does include requirements for the dissemination of radionuclide data and products.

  18. Theoretical and Practical Aspects of Logistic Quality Management System Documentation Development Process

    Directory of Open Access Journals (Sweden)

    Linas Šaulinskas

    2013-12-01

    Full Text Available This paper addresses aspects of logistics quality management system documentation development and suggests models for quality management system documentation development, documentation hierarchical systems and authorization approval. It also identifies logistic processes and a responsibilities model and a detailed document development and approval process that can be practically applied. Our results are based upon an analysis of advanced Lithuanian and foreign corporate business practices, a review of current literature and recommendations for quality management system standards.

  19. [Recommendations for the control of documents and the establishment of a documentary system].

    Science.gov (United States)

    Vinner, E

    2013-06-01

    The quality management system that must be implemented in a MBL to meet the requirements of the standard NF EN ISO 15189 is based, among other things, on the creation and use by staff of a documentary system approved and updated. This documentary system is constituted by external documents (standards, suppliers' documents...) and internal documents (quality manual, procedures, instructions, technical and quality recordings...). A procedure of the documentary system control must be formalized. The documentary system should be modeled in order to identify the various procedures to be drafted and the incurred risks in the case a document would be missing in this system. Each document must be indexed in a unique way and document management must be carried out rigorously. The use of document management software is a great help to manage the life cycle of documents.

  20. Comment Response on the Final Report: Peer Review of the Total System Performance Assessment-Viability Assessment (TSPA-VA)

    International Nuclear Information System (INIS)

    Pendleton, M. W.

    1999-01-01

    The Management and Operating Contractor established a Performance Assessment Peer Review Panel (hereinafter ''the Panel'') at the request of the U.S. Department of Energy Yucca Mountain Site Characterization Office. The objectives of the peer review were to provide: (1) A formal, independent evaluation and critique of Viability Assessment of a Repository at Yucca Mountain: Total System Performance Assessment, Volume 3 (DOE 1998a; hereinafter ''Total System Performance Assessment-Viability Assessment'') that was conducted in support of the Viability Assessment of a Repository at Yucca Mountain (DOE 1998b). (2) Suggestions for improvements as the U.S. Department of Energy prepares to develop the documentation for a Total System Performance Assessment to support a potential License Application. The Panel conducted a phased review over a two-year period to observe the development and, ultimately, to review the Total System Performance Assessment-Viability Assessment (DOE 1998a). During the development of the Total System Performance Assessment-Viability Assessment (DOE 1998a), the Panel submitted three Interim Reports (Whipple et al., 1997a, 1997b, and 1998) to the Management and Operating Contractor with recommendations and comments on the process models, model abstractions, and draft documentation for the Total System Performance Assessment-Viability Assessment (DOE 1998a). The Panel's Final Report Total System Performance Assessment Peer Review Panel (Whipple et al. 1999; hereinafter ''Final Report'') on the Total System Performance Assessment-Viability Assessment (DOE 1998a) is based primarily on the completed Total System Performance Assessment-Viability Assessment (DOE 1998a), the Total System Performance Assessment-Viability Assessment (TSPA-VA) Analyses Technical Basis Document (CRWMS M and O 1998), and the cited references. The Final Report (Whipple et al. 1999) includes the major points from the three Interim Reports (Whipple et al. 1997a, 1997b, and 1998

  1. Total System Performance Assessment - License Application Methods and Approach

    Energy Technology Data Exchange (ETDEWEB)

    J. McNeish

    2003-12-08

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document.

  2. Assessment of Deafblind Access to Manual Language Systems (ADAMLS)

    Science.gov (United States)

    Blaha, Robbie; Carlson, Brad

    2007-01-01

    This document presents the Assessment of Deafblind Access to Manual Language Systems (ADAMLS), a resource for educational teams who are responsible for developing appropriate adaptations and strategies for children who are deafblind who are candidates for learning manual language systems. The assessment tool should be used for all children with a…

  3. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  4. Kauai Test Facility hazards assessment document

    Energy Technology Data Exchange (ETDEWEB)

    Swihart, A

    1995-05-01

    The Department of Energy Order 55003A requires facility-specific hazards assessment be prepared, maintained, and used for emergency planning purposes. This hazards assessment document describes the chemical and radiological hazards associated with the Kauai Test Facility, Barking Sands, Kauai, Hawaii. The Kauai Test Facility`s chemical and radiological inventories were screened according to potential airborne impact to onsite and offsite individuals. The air dispersion model, ALOHA, estimated pollutant concentrations downwind from the source of a release, taking into consideration the toxicological and physical characteristics of the release site, the atmospheric conditions, and the circumstances of the release. The greatest distance to the Early Severe Health Effects threshold is 4.2 kilometers. The highest emergency classification is a General Emergency at the {open_quotes}Main Complex{close_quotes} and a Site Area Emergency at the Kokole Point Launch Site. The Emergency Planning Zone for the {open_quotes}Main Complex{close_quotes} is 5 kilometers. The Emergency Planning Zone for the Kokole Point Launch Site is the Pacific Missile Range Facility`s site boundary.

  5. Kauai Test Facility hazards assessment document

    International Nuclear Information System (INIS)

    Swihart, A.

    1995-05-01

    The Department of Energy Order 55003A requires facility-specific hazards assessment be prepared, maintained, and used for emergency planning purposes. This hazards assessment document describes the chemical and radiological hazards associated with the Kauai Test Facility, Barking Sands, Kauai, Hawaii. The Kauai Test Facility's chemical and radiological inventories were screened according to potential airborne impact to onsite and offsite individuals. The air dispersion model, ALOHA, estimated pollutant concentrations downwind from the source of a release, taking into consideration the toxicological and physical characteristics of the release site, the atmospheric conditions, and the circumstances of the release. The greatest distance to the Early Severe Health Effects threshold is 4.2 kilometers. The highest emergency classification is a General Emergency at the open-quotes Main Complexclose quotes and a Site Area Emergency at the Kokole Point Launch Site. The Emergency Planning Zone for the open-quotes Main Complexclose quotes is 5 kilometers. The Emergency Planning Zone for the Kokole Point Launch Site is the Pacific Missile Range Facility's site boundary

  6. Chemical and Metallurgy Research (CMR) Sample Tracking System Design Document

    International Nuclear Information System (INIS)

    Bargelski, C. J.; Berrett, D. E.

    1998-01-01

    The purpose of this document is to describe the system architecture of the Chemical and Metallurgy Research (CMR) Sample Tracking System at Los Alamos National Laboratory. During the course of the document observations are made concerning the objectives, constraints and limitations, technical approaches, and the technical deliverables

  7. Pilot production system cost/benefit analysis: Digital document storage project

    Science.gov (United States)

    1989-01-01

    The Digital Document Storage (DDS)/Pilot Production System (PPS) will provide cost effective electronic document storage, retrieval, hard copy reproduction, and remote access for users of NASA Technical Reports. The DDS/PPS will result in major benefits, such as improved document reproduction quality within a shorter time frame than is currently possible. In addition, the DDS/PPS will provide an important strategic value through the construction of a digital document archive. It is highly recommended that NASA proceed with the DDS Prototype System and a rapid prototyping development methodology in order to validate recent working assumptions upon which the success of the DDS/PPS is dependent.

  8. The System 80+ Standard Plant design control document. Volume 15

    International Nuclear Information System (INIS)

    1997-01-01

    This Design Control Document (DCD) is a repository of information comprising the System 80+trademark Standard Plant Design. The DCD also provides that design-related information to be incorporated by reference in the design certification rule for the System 80+ Standard Plant Design. Applicants for a combined license pursuant to 10 CFR 52 must ensure that the final Design Certification Rule and the associated Statements of Consideration are used when making all licensing decisions relevant to the System 80+ Standard Plant Design. The Design Control Document contains the DCD introduction, The Certified Design Material (CDM) [i.e., ''Tier 1''] and the Approved Design Material (ADM) [i.e., ''Tier 2''] for the System 80+ Standard Plant Design. The CDM includes the following sections: (1) Introductory material; (2) Certified Design Material for System 80+ systems and structures; (3) Certified Design Material for non-system-based aspects of the System 80+ Certified design; (4) Interface requirements; and (5) Site parameters. The ADM, to the extent applicable for the System 80+ Standard Plant Design, includes: (1) the information required for the final safety analysis report under 20 CFR 50.34; (2) other relevant information required by 10 CFR 52.47; and (3) emergency operations guidelines. This volume contains all five parts of section 12 (Radiation Protection) of the ADM Design and Analysis. Topics covered are: ALARA exposures; radiation sources; radiation protection; dose assessment; and health physics program. All six parts and appendices A and B for section 13 (Conduct of Operations) of the ADM Design and Analysis are also contained in this volume. Topics covered are: organizational structure; training program; emergency planning; review and audit; plant procedures; industrial security; sabotage protection (App 13A); and vital equipment list (App 13B)

  9. ON EXPERIENCE OF THE ELECTRONIC DOCUMENT MANAGEMENT SYSTEM IMPLEMENTATION IN THE MEDICAL UNIVERSITY

    Directory of Open Access Journals (Sweden)

    A. V. Semenets

    2015-05-01

    Full Text Available An importance of the application of the electronic document management to the Ukraine healthcare is shown. The electronic document management systems market overview is presented. Example of the usage of the open-source electronic document management system in the Ternopil State Medical University by I. Ya. Horbachevsky is shown. The implementation capabilities of the electronic document management system within a cloud services are shown. The electronic document management features of the Microsoft Office 365 and Google Apps For Education are compared. Some results of the usage of the Google Apps For Education inTSMUas electronic document management system are presented.

  10. Document Management and Exchange System – Supporting Education Process

    Directory of Open Access Journals (Sweden)

    Emil Egredzija

    2010-03-01

    Full Text Available Development and implementation of new technologies are very important in education. One of the most challenging tasks in the education process is to build efficient and cost-friendly system for content management and exchange. The system has to be reliable, easy manageable and open. Centralized storage, secured access, and ubiquitous client technologies have emerged as best-practice solutions in engineering that kind of services. Users can easily publish or exchange documents and not need to worry about their distribution, storage or technical skills required for efficient document management. The system that will be presented is built on open source technologies and is deployable on all today's popular web software platforms. The web server, the programming language and operating system that are used to build and deploy such a system are all non-proprietary and completely open because our mission was to build system that can be easily extended and not limited by its corporate license. The system uses security mechanisms such as user group access policy, operating system level security (file system and secured data storage in database. Because of the growing need for document management in education process we believe that this project will find its place in practice.

  11. Pengembangan Electronic Document Management System (EDMS) Sebagai Alternatif Pengarsipan Di Perguruan Tinggi

    OpenAIRE

    Amin, M. Miftakul

    2010-01-01

    The purpose of this paper is to develop an electronic document management system (EDMS). With a system is expected to be an alternative in the management of electronic documents in the college environment. Writing this using qualitative research approach with observation, document analysis, and interviews for data collection process. The system used a web-based system that is expected to reach the users of the system at large. This system has the functionality to store, archive, and retrieve...

  12. Delve: A Data Set Retrieval and Document Analysis System

    KAUST Repository

    Akujuobi, Uchenna Thankgod

    2017-12-29

    Academic search engines (e.g., Google scholar or Microsoft academic) provide a medium for retrieving various information on scholarly documents. However, most of these popular scholarly search engines overlook the area of data set retrieval, which should provide information on relevant data sets used for academic research. Due to the increasing volume of publications, it has become a challenging task to locate suitable data sets on a particular research area for benchmarking or evaluations. We propose Delve, a web-based system for data set retrieval and document analysis. This system is different from other scholarly search engines as it provides a medium for both data set retrieval and real time visual exploration and analysis of data sets and documents.

  13. Earth System Documentation (ES-DOC) Preparation for CMIP6

    Science.gov (United States)

    Denvil, S.; Murphy, S.; Greenslade, M. A.; Lawrence, B.; Guilyardi, E.; Pascoe, C.; Treshanksy, A.; Elkington, M.; Hibling, E.; Hassell, D.

    2015-12-01

    During the course of 2015 the Earth System Documentation (ES-DOC) project began its preparations for CMIP6 (Coupled Model Inter-comparison Project 6) by further extending the ES-DOC tooling ecosystem in support of Earth System Model (ESM) documentation creation, search, viewing & comparison. The ES-DOC online questionnaire, the ES-DOC desktop notebook, and the ES-DOC python toolkit will serve as multiple complementary pathways to generating CMIP6 documentation. It is envisaged that institutes will leverage these tools at different points of the CMIP6 lifecycle. Institutes will be particularly interested to know that the documentation burden will be either streamlined or completely automated.As all the tools are tightly integrated with the ES-DOC web-service, institutes can be confident that the latency between documentation creation & publishing will be reduced to a minimum. Published documents will be viewable with the online ES-DOC Viewer (accessible via citable URL's). Model inter-comparison scenarios will be supported using the ES-DOC online Comparator tool. The Comparator is being extended to:• Support comparison of both Model descriptions & Simulation runs;• Greatly streamline the effort involved in compiling official tables.The entire ES-DOC ecosystem is open source and built upon open standards such as the Common Information Model (CIM) (versions 1 and 2).

  14. A Type System for Dynamic Web Documents

    DEFF Research Database (Denmark)

    Schwartzbach, Michael Ignatieff; Sandholm, Anders

    2000-01-01

    Many interactive Web services use the CGI interface for communication with clients. They will dynamically create HTML documents that are presented to the client who then resumes the interaction by submitting data through incorporated form fields. This protocol is difficult to statically type-chec...... system is based on a flow analysis of which we prove soundness. We present an efficient runtime implementation that respects the semantics of only well-typed programs. This work is fully implemented as part of the system for defining interactive Web services.......Many interactive Web services use the CGI interface for communication with clients. They will dynamically create HTML documents that are presented to the client who then resumes the interaction by submitting data through incorporated form fields. This protocol is difficult to statically type...

  15. Document Examination: Applications of Image Processing Systems.

    Science.gov (United States)

    Kopainsky, B

    1989-12-01

    Dealing with images is a familiar business for an expert in questioned documents: microscopic, photographic, infrared, and other optical techniques generate images containing the information he or she is looking for. A recent method for extracting most of this information is digital image processing, ranging from the simple contrast and contour enhancement to the advanced restoration of blurred texts. When combined with a sophisticated physical imaging system, an image pricessing system has proven to be a powerful and fast tool for routine non-destructive scanning of suspect documents. This article reviews frequent applications, comprising techniques to increase legibility, two-dimensional spectroscopy (ink discrimination, alterations, erased entries, etc.), comparison techniques (stamps, typescript letters, photo substitution), and densitometry. Computerized comparison of handwriting is not included. Copyright © 1989 Central Police University.

  16. ON EXPERIENCE OF THE ELECTRONIC DOCUMENT MANAGEMENT SYSTEM IMPLEMENTATION IN THE MEDICAL UNIVERSITY

    OpenAIRE

    A. V. Semenets; V. Yu. Kovalok

    2015-01-01

    An importance of the application of the electronic document management to the Ukraine healthcare is shown. The electronic document management systems market overview is presented. Example of the usage of the open-source electronic document management system in the Ternopil State Medical University by I. Ya. Horbachevsky is shown. The implementation capabilities of the electronic document management system within a cloud services are shown. The electronic document management features of the Mi...

  17. Case histories of environmental assessment documents for nuclear waste

    International Nuclear Information System (INIS)

    Vocke, R.W.

    1985-01-01

    Nuclear power programs and policies in the United States have been subject to environmental assessment under the National Environmental Policy Act (NEPA) since 1971. NEPA documentation prepared for programmatic policy decision-making fuel cycle and concurrent federal policy are examined as they relate to radioactive waste management in this paper. Key programmatic environmental impact statements that address radioactive waste management include: the Atomic Energy Commission document on management of commercial high level and transuranium-contaminated radioactive waste, which focussed on development of engineered retrievable surface storage facilities (RSSF); the Nuclear Regulatory Commission (NRC) document on use of recycled plutonium in mixed oxide fuel in light water cooled reactors, which focussed on plutonium recycle and RSSF; the NRC statement on handling of spent light water power reactor fuel, which focussed on spent fuel storage; and the Department of Energy (DOE) statement on management of commercially generated radioactive wastes, which focussed on development of deep geologic repositories. DOE is currently pursuing the deep geologic repository option, with monitored retrievable storage as a secondary option

  18. Waste Management System Requirement document

    International Nuclear Information System (INIS)

    1990-04-01

    This volume defines the top level technical requirements for the Monitored Retrievable Storage (MRS) facility. It is designed to be used in conjunction with Volume 1, General System Requirements. Volume 3 provides a functional description expanding the requirements allocated to the MRS facility in Volume 1 and, when appropriate, elaborates on requirements by providing associated performance criteria. Volumes 1 and 3 together convey a minimum set of requirements that must be satisfied by the final MRS facility design without unduly constraining individual design efforts. The requirements are derived from the Nuclear Waste Policy Act of 1982 (NWPA), the Nuclear Waste Policy Amendments Act of 1987 (NWPAA), the Environmental Protection Agency's (EPA) Environmental Standards for the Management and Disposal of Spent Nuclear Fuel (40 CFR 191), NRC Licensing Requirements for the Independent Storage of Spent Nuclear and High-Level Radioactive Waste (10 CFR 72), and other federal statutory and regulatory requirements, and major program policy decisions. This document sets forth specific requirements that will be fulfilled. Each subsequent level of the technical document hierarchy will be significantly more detailed and provide further guidance and definition as to how each of these requirements will be implemented in the design. Requirements appearing in Volume 3 are traceable into the MRS Design Requirements Document. Section 2 of this volume provides a functional breakdown for the MRS facility. 1 tab

  19. Improving documentation of a beta-blocker quality measure through an anesthesia information management system and real-time notification of documentation errors.

    Science.gov (United States)

    Nair, Bala G; Peterson, Gene N; Newman, Shu-Fang; Wu, Wei-Ying; Kolios-Morris, Vickie; Schwid, Howard A

    2012-06-01

    Continuation of perioperative beta-blockers for surgical patients who are receiving beta-blockers prior to arrival for surgery is an important quality measure (SCIP-Card-2). For this measure to be considered successful, name, date, and time of the perioperative beta-blocker must be documented. Alternately, if the beta-blocker is not given, the medical reason for not administering must be documented. Before the study was conducted, the institution lacked a highly reliable process to document the date and time of self-administration of beta-blockers prior to hospital admission. Because of this, compliance with the beta-blocker quality measure was poor (-65%). To improve this measure, the anesthesia care team was made responsible for documenting perioperative beta-blockade. Clear documentation guidelines were outlined, and an electronic Anesthesia Information Management System (AIMS) was configured to facilitate complete documentation of the beta-blocker quality measure. In addition, real-time electronic alerts were generated using Smart Anesthesia Messenger (SAM), an internally developed decision-support system, to notify users concerning incomplete beta-blocker documentation. Weekly compliance for perioperative beta-blocker documentation before the study was 65.8 +/- 16.6%, which served as the baseline value. When the anesthesia care team started documenting perioperative beta-blocker in AIMS, compliance was 60.5 +/- 8.6% (p = .677 as compared with baseline). Electronic alerts with SAM improved documentation compliance to 94.6 +/- 3.5% (p documentation and (2) enhance features in the electronic medical systems to alert the user concerning incomplete documentation.

  20. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  1. QCS: a system for querying, clustering and summarizing documents.

    Energy Technology Data Exchange (ETDEWEB)

    Dunlavy, Daniel M.; Schlesinger, Judith D. (Center for Computing Sciences, Bowie, MD); O' Leary, Dianne P. (University of Maryland, College Park, MD); Conroy, John M. (Center for Computing Sciences, Bowie, MD)

    2006-10-01

    Information retrieval systems consist of many complicated components. Research and development of such systems is often hampered by the difficulty in evaluating how each particular component would behave across multiple systems. We present a novel hybrid information retrieval system--the Query, Cluster, Summarize (QCS) system--which is portable, modular, and permits experimentation with different instantiations of each of the constituent text analysis components. Most importantly, the combination of the three types of components in the QCS design improves retrievals by providing users more focused information organized by topic. We demonstrate the improved performance by a series of experiments using standard test sets from the Document Understanding Conferences (DUC) along with the best known automatic metric for summarization system evaluation, ROUGE. Although the DUC data and evaluations were originally designed to test multidocument summarization, we developed a framework to extend it to the task of evaluation for each of the three components: query, clustering, and summarization. Under this framework, we then demonstrate that the QCS system (end-to-end) achieves performance as good as or better than the best summarization engines. Given a query, QCS retrieves relevant documents, separates the retrieved documents into topic clusters, and creates a single summary for each cluster. In the current implementation, Latent Semantic Indexing is used for retrieval, generalized spherical k-means is used for the document clustering, and a method coupling sentence 'trimming', and a hidden Markov model, followed by a pivoted QR decomposition, is used to create a single extract summary for each cluster. The user interface is designed to provide access to detailed information in a compact and useful format. Our system demonstrates the feasibility of assembling an effective IR system from existing software libraries, the usefulness of the modularity of the design

  2. QCS : a system for querying, clustering, and summarizing documents.

    Energy Technology Data Exchange (ETDEWEB)

    Dunlavy, Daniel M.

    2006-08-01

    Information retrieval systems consist of many complicated components. Research and development of such systems is often hampered by the difficulty in evaluating how each particular component would behave across multiple systems. We present a novel hybrid information retrieval system--the Query, Cluster, Summarize (QCS) system--which is portable, modular, and permits experimentation with different instantiations of each of the constituent text analysis components. Most importantly, the combination of the three types of components in the QCS design improves retrievals by providing users more focused information organized by topic. We demonstrate the improved performance by a series of experiments using standard test sets from the Document Understanding Conferences (DUC) along with the best known automatic metric for summarization system evaluation, ROUGE. Although the DUC data and evaluations were originally designed to test multidocument summarization, we developed a framework to extend it to the task of evaluation for each of the three components: query, clustering, and summarization. Under this framework, we then demonstrate that the QCS system (end-to-end) achieves performance as good as or better than the best summarization engines. Given a query, QCS retrieves relevant documents, separates the retrieved documents into topic clusters, and creates a single summary for each cluster. In the current implementation, Latent Semantic Indexing is used for retrieval, generalized spherical k-means is used for the document clustering, and a method coupling sentence ''trimming'', and a hidden Markov model, followed by a pivoted QR decomposition, is used to create a single extract summary for each cluster. The user interface is designed to provide access to detailed information in a compact and useful format. Our system demonstrates the feasibility of assembling an effective IR system from existing software libraries, the usefulness of the modularity of

  3. Use of an advanced document system in post-refuelling updating of nuclear power plant documentation; Utilizacion de un sistema documental avanzado en la actualizacion de documentacion post recarga

    Energy Technology Data Exchange (ETDEWEB)

    Puech Suanzes, P; Cortes Soler, M [Empresarios Agrupados, A.I.E., Madrid (Spain)

    1993-12-15

    This paper discusses the results of the extensive use of an advanced document system to update documentation prepared by traditional methods and affected by changes in the period between two plant refuellings. The implementation of a system for the capture, retrieval and storage of drawings using optical discs is part of a plan to modernize production and management tools and to thus achieve better control of document configuration. These processes are consequently optimized in that: 1. The deterioration of drawings is detained with the help of an identical, updated, legible, reliable support for all users. 2. The time required to update documentation is reduced. Given the large number of drawings, the implementation method should effectively combine costs and time. The document management tools ensure optical disc storage control so that from the moment a drawing resides in the system, any modification to it is made through the system utilities, thus ensuring quality and reducing schedules. The system described was used to update the electrical drawings of Almaraz Nuclear Power Plant. Changes made during the eighth refuelling of Unit I were incorporated and the time needed to issue the updated drawings was reduced by one month. (author)

  4. Monitored Retrievable Storage System Requirements Document. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Monitored Retrievable Storage System Requirements Document (MRS-SRD) describes the functions to be performed and technical requirements for a Monitored Retrievable Storage (MRS) facility subelement and the On-Site Transfer and Storage (OSTS) subelement. The MRS facility subelement provides for temporary storage, at a Civilian Radioactive Waste Management System (CRWMS) operated site, of spent nuclear fuel (SNF) contained in an NRC-approved Multi-Purpose Canister (MPC) storage mode, or other NRC-approved storage modes. The OSTS subelement provides for transfer and storage, at Purchaser sites, of spent nuclear fuel (SNF) contained in MPCs. Both the MRS facility subelement and the OSTS subelement are in support of the CRWMS. The purpose of the MRS-SRD is to define the top-level requirements for the development of the MRS facility and the OSTS. These requirements include design, operation, and decommissioning requirements to the extent they impact on the physical development of the MRS facility and the OSTS. The document also presents an overall description of the MRS facility and the OSTS, their functions (derived by extending the functional analysis documented by the Physical System Requirements (PSR) Store Waste Document), their segments, and the requirements allocated to the segments. In addition, the top-level interface requirements of the MRS facility and the OSTS are included. As such, the MRS-SRD provides the technical baseline for the MRS Safety Analysis Report (SAR) design and the OSTS Safety Analysis Report design.

  5. Pedagogical Voyeurism: Dialogic Critique of Documentation and Assessment of Learning

    Science.gov (United States)

    Matusov, Eugene; Marjanovic-Shane, Ana; Meacham, Sohyun

    2016-01-01

    We challenge a common emphasis on documentation and assessment of learning for providing good education: from the mainstream of neoliberal accountability movement to the progressive Reggio Emilia schools. We develop these arguments through discussing: 1) immeasurableness of education and learning, 2) students' ownership/authorship of education and…

  6. Quality assurance application in the documentation of nuclear research reactor

    International Nuclear Information System (INIS)

    Nababan, N.

    1999-01-01

    For each nuclear research reactor a document control system should be established and should be provide for preparation, review, approval, issuance, distribution, revision and validation (where appropriate) of documents essential to the management, performance and verification of work. In the document control system the responsibilities for each participating organization or individual should be defined in writing. The types of document include, but are not limited to document comprising the QA program, safety requirements, maintenance and operating procedures, inspection instructions, inspection and test reports, assessment reports, drawings, data files, calculations, specifications, computer codes, purchase orders and related documents, vendor supplied documents and work instruction. Management should identify the need for documents and should provide guidance to the organizations and people preparing them. The guidance should cover the status, scope and contents and the policies, standards and codes witch apply. It should also explain the need for feedback of experience. Plant modification or the results of assessments could also give rise to the need for a new document

  7. World Energy Projection System model documentation

    International Nuclear Information System (INIS)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA

  8. World Energy Projection System model documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

  9. Using Electronic Systems for Document Management in Economic Entities

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Document workflow and management, be them scanned documents, computer-generated e-documents or complex file formats, are critical elements for the success of an organization. Delivering the correct information to the right person, at the right moment is a fundamental element of daily activity. In the Internet era, documents have a new format; and what is more important: completely new functions. Paper is replaced by electronic formats such as .html, .xms, .pdf or .doc. The price for this progress is the increasing technological complexity, and with this complexity comes the need for more efficient techniques of management and organization such as a document management electronic system. This paper aims to present document management not as a separate software category on the IT market, but as an element integrated with any software solution, maximizing its capacity of making business more efficient.

  10. Predicting Document Retrieval System Performance: An Expected Precision Measure.

    Science.gov (United States)

    Losee, Robert M., Jr.

    1987-01-01

    Describes an expected precision (EP) measure designed to predict document retrieval performance. Highlights include decision theoretic models; precision and recall as measures of system performance; EP graphs; relevance feedback; and computing the retrieval status value of a document for two models, the Binary Independent Model and the Two Poisson…

  11. Issues in Designing a Hypermedia Document System: The Intermedia Case Study.

    Science.gov (United States)

    Yankelovich, Nicole; And Others

    1986-01-01

    Intermedia, a hypermedia system developed at Brown University's Institute for Research (Rhode Island) in Information and Scholarship, is first described, and then used as a case study to explore a number of key issues that software designers must consider in the development of hypermedia document systems. A hypermedia document system is defined as…

  12. Documentation assessment, Project C-018H, 200-E area effluent treatment facility

    International Nuclear Information System (INIS)

    Peres, M.W.; Connor, M.D.; Mertelendy, J.I.

    1994-01-01

    Project C-018H is one of the fourteen subprojects to the Hanford Environmental Compliance (HEC) Project. Project C-018H provides treatment and disposal for the 242-A Evaporator and PUREX plant process condensate waste streams. This project used the Integrated Management Team (IMT) approach proposed by RL. The IMT approach included all affected organizations on the project team to coordinate and execute all required project tasks, while striving to integrate and satisfy all technical, operational, functional, and organizational objectives. The HEC Projects were initiated in 1989. Project C-018H began in early 1990, with completion of construction currently targeted for mid-1995. This assessment was performed to evaluate the effectiveness of the management control on design documents and quality assurance records developed and submitted for processing, use, and retention for the Project. The assessment focused primarily on the overall adequacy and quality of the design documentation currently being submitted to the project document control function

  13. Development of a system for managing document delivery schedule(DDS) for NSSS system design

    International Nuclear Information System (INIS)

    Baek, S. H.; Baek, J. M.; Sohn, Y. S.; Shon, G. H.

    1999-01-01

    The construction of nuclear power plant is a long-term project from initial design to commercial operation. To accomplish NSSS (Nuclear Steam Supply System) system design successfully, the systematic and effective method for managing the system design product and interface correspondence with other organizations is required. To meet this requirement, a system has been developed to control the document delivery schedule, approval process and interface correspondence transmittal, and to report the documentation status periodically from the beginning of the YGN 5 and 6 project. This system is expected to contribute as the beginning step to development of integrated project management system. (author)

  14. [Development and integration of the Oncological Documentation System ODS].

    Science.gov (United States)

    Raab, G; van Den Bergh, M

    2001-08-01

    To simplify clinical routine and to improve medical quality without exceeding the existing resources. Intensifying communication and cooperation between all institutions of patients' health care. The huge amount of documentation work of physicians can no longer be done without modern tools of paperless data processing. The development of ODS was a tight cooperation between physician and technician which resulted in a mutual understanding and led to a high level of user convenience. - At present all cases of gynecology, especially gynecologic oncology can be documented and processed by ODS. Users easily will adopt the system as data entry within different program areas follows the same rules. In addition users can choose between an individual input of data and assistants guiding them through highly specific areas of documentation. ODS is a modern, modular structured and very fast multiuser database environment for in- and outpatient documentation. It automatically generates a lot of reports for clinical day to day business. Statistical routines will help the user reflecting his work and its quality. Documentation of clinical trials according to the GCP guidelines can be done by ODS using the internet or offline datasharing. As ODS is the synthesis of a computer based patient administration system and an oncological documentation database, it represents the basis for the construction of the electronical patient chart as well as the digital documentation of clinical trials. The introduction of this new technology to physicians and nurses has to be done slowly and carefully, in order to increase motivation and to improve the results.

  15. Advanced Manufacturing Processes Laboratory Building 878 hazards assessment document

    Energy Technology Data Exchange (ETDEWEB)

    Wood, C.; Thornton, W.; Swihart, A.; Gilman, T.

    1994-07-01

    The introduction of the hazards assessment process is to document the impact of the release of hazards at the Advanced Manufacturing Processes Laboratory (AMPL) that are significant enough to warrant consideration in Sandia National Laboratories` operational emergency management program. This hazards assessment is prepared in accordance with the Department of Energy Order 5500.3A requirement that facility-specific hazards assessments be prepared, maintained, and used for emergency planning purposes. This hazards assessment provides an analysis of the potential airborne release of chemicals associated with the operations and processes at the AMPL. This research and development laboratory develops advanced manufacturing technologies, practices, and unique equipment and provides the fabrication of prototype hardware to meet the needs of Sandia National Laboratories, Albuquerque, New Mexico (SNL/NM). The focus of the hazards assessment is the airborne release of materials because this requires the most rapid, coordinated emergency response on the part of the AMPL, SNL/NM, collocated facilities, and surrounding jurisdiction to protect workers, the public, and the environment.

  16. Advanced Manufacturing Processes Laboratory Building 878 hazards assessment document

    International Nuclear Information System (INIS)

    Wood, C.; Thornton, W.; Swihart, A.; Gilman, T.

    1994-07-01

    The introduction of the hazards assessment process is to document the impact of the release of hazards at the Advanced Manufacturing Processes Laboratory (AMPL) that are significant enough to warrant consideration in Sandia National Laboratories' operational emergency management program. This hazards assessment is prepared in accordance with the Department of Energy Order 5500.3A requirement that facility-specific hazards assessments be prepared, maintained, and used for emergency planning purposes. This hazards assessment provides an analysis of the potential airborne release of chemicals associated with the operations and processes at the AMPL. This research and development laboratory develops advanced manufacturing technologies, practices, and unique equipment and provides the fabrication of prototype hardware to meet the needs of Sandia National Laboratories, Albuquerque, New Mexico (SNL/NM). The focus of the hazards assessment is the airborne release of materials because this requires the most rapid, coordinated emergency response on the part of the AMPL, SNL/NM, collocated facilities, and surrounding jurisdiction to protect workers, the public, and the environment

  17. Authentication systems for securing clinical documentation workflows. A systematic literature review.

    Science.gov (United States)

    Schwartze, J; Haarbrandt, B; Fortmeier, D; Haux, R; Seidel, C

    2014-01-01

    Integration of electronic signatures embedded in health care processes in Germany challenges health care service and supply facilities. The suitability of the signature level of an eligible authentication procedure is confirmed for a large part of documents in clinical practice. However, the concrete design of such a procedure remains unclear. To create a summary of usable user authentication systems suitable for clinical workflows. A Systematic literature review based on nine online bibliographic databases. Search keywords included authentication, access control, information systems, information security and biometrics with terms user authentication, user identification and login in title or abstract. Searches were run between 7 and 12 September 2011. Relevant conference proceedings were searched manually in February 2013. Backward reference search of selected results was done. Only publications fully describing authentication systems used or usable were included. Algorithms or purely theoretical concepts were excluded. Three authors did selection independently. DATA EXTRACTION AND ASSESSMENT: Semi-structured extraction of system characteristics was done by the main author. Identified procedures were assessed for security and fulfillment of relevant laws and guidelines as well as for applicability. Suitability for clinical workflows was derived from the assessments using a weighted sum proposed by Bonneau. Of 7575 citations retrieved, 55 publications meet our inclusion criteria. They describe 48 different authentication systems; 39 were biometric and nine graphical password systems. Assessment of authentication systems showed high error rates above European CENELEC standards and a lack of applicability of biometric systems. Graphical passwords did not add overall value compared to conventional passwords. Continuous authentication can add an additional layer of safety. Only few systems are suitable partially or entirely for use in clinical processes. Suitability

  18. Automotive Manufacturing Assessment System : Volume 1. Master Product Schedules.

    Science.gov (United States)

    1999-11-01

    Volume I is part of a four volume set documenting areas of research resulting from the development of the Automotive Manufacturing Assessment System (AMAS) for the DOT/Transportation Systems Center. AMAS was designed to assist in the evaluation of in...

  19. The OCaml system release 4.04: Documentation and user's manual

    OpenAIRE

    Leroy, Xavier; Doligez, Damien; Frisch, Alain; Garrigue, Jacques; Rémy, Didier; Vouillon, Jérôme

    2016-01-01

    This manual documents the release 4.04 of the OCaml system. It is organized as follows. Part I, "An introduction to OCaml", gives an overview of the language. Part II, "The OCaml language", is the reference description of the language. Part III, "The OCaml tools", documents the compilers, toplevel system, and programming utilities. Part IV, "The OCaml library", describes the modules provided in the standard library.

  20. The OCaml system release 4.02: Documentation and user's manual

    OpenAIRE

    Leroy, Xavier; Doligez, Damien; Frisch, Alain; Garrigue, Jacques; Rémy, Didier; Vouillon, Jérôme

    2014-01-01

    This manual documents the release 4.02 of the OCaml system. It is organized as follows. Part I, "An introduction to OCaml", gives an overview of the language. Part II, "The OCaml language", is the reference description of the language. Part III, "The OCaml tools", documents the compilers, toplevel system, and programming utilities. Part IV, "The OCaml library", describes the modules provided in the standard library.

  1. The OCaml system release 4.06: Documentation and user's manual

    OpenAIRE

    Leroy , Xavier; Doligez , Damien; Frisch , Alain; Garrigue , Jacques; Rémy , Didier; Vouillon , Jérôme

    2017-01-01

    This manual documents the release 4.06 of the OCaml system. It is organized as follows. Part I, "An introduction to OCaml", gives an overview of the language. Part II, "The OCaml language", is the reference description of the language. Part III, "The OCaml tools", documents the compilers, toplevel system, and programming utilities. Part IV, "The OCaml library", describes the modules provided in the standard library.

  2. Development of a Safety Assessment Information System for the Management of Periodic Safety Assessment Activities

    International Nuclear Information System (INIS)

    Song, Tae Young

    2007-01-01

    At present, the 10-year Periodic Safety Review(PSR) has been performing to confirm all the aspects of safety issues for all the operating plants in compliance with domestic nuclear law of article 23, subarticle 3. For each plant, in addition, Probabilistic Safety Assessment(PSA) and Severe Accident Management Guideline(SAMG) are being implemented and revised periodically to reflect the latest safety level according to principle fulfillment of severe accident policy statement. The assessment reports, as one of outcomes from these activities, are submitted into and reviewed by domestic regulatory body. During reviewing (in-office duty) and licensing (regulatory duty) process, a large number of outcomes of which most are the formal technical reports and licensing materials, are inevitably produced. Moreover, repeated review process over the plants can make them accumulated and produce a variety of documents additionally. This circumstance motivates to develop effective tool or system for the management of these reports and related technical documents for the future use in licensing process and for subsequent plant assessments. This paper presents the development status of Safety Assessment Information System(SAIS) which manages safety-related documents of PSR, PSA and SAMG for practical use for experienced engineers in charge of these areas

  3. Development of a Safety Assessment Information System for the Management of Periodic Safety Assessment Activities

    Energy Technology Data Exchange (ETDEWEB)

    Song, Tae Young [Nuclear Engineering and Technology Institute, Daejeon (Korea, Republic of)

    2007-07-01

    At present, the 10-year Periodic Safety Review(PSR) has been performing to confirm all the aspects of safety issues for all the operating plants in compliance with domestic nuclear law of article 23, subarticle 3. For each plant, in addition, Probabilistic Safety Assessment(PSA) and Severe Accident Management Guideline(SAMG) are being implemented and revised periodically to reflect the latest safety level according to principle fulfillment of severe accident policy statement. The assessment reports, as one of outcomes from these activities, are submitted into and reviewed by domestic regulatory body. During reviewing (in-office duty) and licensing (regulatory duty) process, a large number of outcomes of which most are the formal technical reports and licensing materials, are inevitably produced. Moreover, repeated review process over the plants can make them accumulated and produce a variety of documents additionally. This circumstance motivates to develop effective tool or system for the management of these reports and related technical documents for the future use in licensing process and for subsequent plant assessments. This paper presents the development status of Safety Assessment Information System(SAIS) which manages safety-related documents of PSR, PSA and SAMG for practical use for experienced engineers in charge of these areas.

  4. Assessing Performance of Botswana’s Public Hospital System: The Use of the World Health Organization Health System Performance Assessment Framework

    Directory of Open Access Journals (Sweden)

    Onalenna Seitio-Kgokgwe

    2014-09-01

    Full Text Available Background Very few studies have assessed performance of Botswana public hospitals. We draw from a large research study assessing performance of the Botswana Ministry of Health (MoH to evaluate the performance of public hospital system using the World Health Organization Health Systems Performance Assessment Framework (WHO HSPAF. We aimed to evaluate performance of Botswana public hospital system; relate findings of the assessment to the potential for improvements in hospital performance; and determine the usefulness of the WHO HSPAF in assessing performance of hospital systems in a developing country. Methods This article is based on data collected from document analysis, 54 key informants comprising senior managers and staff of the MoH (N= 40 and senior officers from stakeholder organizations (N= 14, and surveys of 42 hospital managers and 389 health workers. Data from documents and transcripts were analyzed using content and thematic analysis while data analysis for surveys was descriptive determining proportions and percentages. Results The organizational structure of the Botswana’s public hospital system, authority and decision-making are highly centralized. Overall physical access to health services is high. However, challenges in the distribution of facilities and inpatient beds create inequities and inefficiencies. Capacity of the hospitals to deliver services is limited by inadequate resources. There are significant challenges with the quality of care. Conclusion While Botswana invested considerably in building hospitals around the country resulting in high physical access to services, the organization and governance of the hospital system, and inadequate resources limit service delivery. The ongoing efforts to decentralize management of hospitals to district level entities should be expedited. The WHO HSPAF enabled us to conduct a comprehensive assessment of the public hospital system. Though relatively new, this approach proved

  5. A pilot study on the evaluation of medical student documentation: assessment of SOAP notes

    Directory of Open Access Journals (Sweden)

    Ji-Hyun Seo

    2016-06-01

    Full Text Available Purpose: The purpose of this study was evaluation of the current status of medical students' documentation of patient medical records. Methods: We checked the completeness, appropriateness, and accuracy of 95 Subjective-Objective-Assessment-Plan (SOAP notes documented by third-year medical students who participated in clinical skill tests on December 1, 2014. Students were required to complete the SOAP note within 15 minutes of an standard patient (SP-encounter with a SP complaining rhinorrhea and warring about meningitis. Results: Of the 95 SOAP notes reviewed, 36.8% were not signed. Only 27.4% documented the patient’s symptoms under the Objective component, although all students completed the Subjective notes appropriately. A possible diagnosis was assessed by 94.7% students. Plans were described in 94.7% of the SOAP notes. Over half the students planned workups (56.7% for diagnosis and treatment (52.6%. Accurate documentation of the symptoms, physical findings, diagnoses, and plans were provided in 78.9%, 9.5%, 62.1%, and 38.0% notes, respectively. Conclusion: Our results showed that third-year medical students’ SOAP notes were not complete, appropriate, or accurate. The most significant problems with completeness were the omission of students’ signatures, and inappropriate documentation of the physical examinations conducted. An education and assessment program for complete and accurate medical recording has to be developed.

  6. Molten Salt Test Loop (MSTL) system customer interface document.

    Energy Technology Data Exchange (ETDEWEB)

    Gill, David Dennis; Kolb, William J.; Briggs, Ronald D.

    2013-09-01

    The National Solar Thermal Test Facility at Sandia National Laboratories has a unique test capability called the Molten Salt Test Loop (MSTL) system. MSTL is a test capability that allows customers and researchers to test components in flowing, molten nitrate salt. The components tested can range from materials samples, to individual components such as flex hoses, ball joints, and valves, up to full solar collecting systems such as central receiver panels, parabolic troughs, or linear Fresnel systems. MSTL provides realistic conditions similar to a portion of a concentrating solar power facility. The facility currently uses 60/40 nitrate %E2%80%9Csolar salt%E2%80%9D and can circulate the salt at pressure up to 40 bar (600psi), temperature to 585%C2%B0C, and flow rate of 44-50kg/s(400-600GPM) depending on temperature. The purpose of this document is to provide a basis for customers to evaluate the applicability to their testing needs, and to provide an outline of expectations for conducting testing on MSTL. The document can serve as the basis for testing agreements including Work for Others (WFO) and Cooperative Research and Development Agreements (CRADA). While this document provides the basis for these agreements and describes some of the requirements for testing using MSTL and on the site at Sandia, the document is not sufficient by itself as a test agreement. The document, however, does provide customers with a uniform set of information to begin the test planning process.

  7. Large Scale Document Inversion using a Multi-threaded Computing System.

    Science.gov (United States)

    Jung, Sungbo; Chang, Dar-Jen; Park, Juw Won

    2017-06-01

    Current microprocessor architecture is moving towards multi-core/multi-threaded systems. This trend has led to a surge of interest in using multi-threaded computing devices, such as the Graphics Processing Unit (GPU), for general purpose computing. We can utilize the GPU in computation as a massive parallel coprocessor because the GPU consists of multiple cores. The GPU is also an affordable, attractive, and user-programmable commodity. Nowadays a lot of information has been flooded into the digital domain around the world. Huge volume of data, such as digital libraries, social networking services, e-commerce product data, and reviews, etc., is produced or collected every moment with dramatic growth in size. Although the inverted index is a useful data structure that can be used for full text searches or document retrieval, a large number of documents will require a tremendous amount of time to create the index. The performance of document inversion can be improved by multi-thread or multi-core GPU. Our approach is to implement a linear-time, hash-based, single program multiple data (SPMD), document inversion algorithm on the NVIDIA GPU/CUDA programming platform utilizing the huge computational power of the GPU, to develop high performance solutions for document indexing. Our proposed parallel document inversion system shows 2-3 times faster performance than a sequential system on two different test datasets from PubMed abstract and e-commerce product reviews. •Information systems➝Information retrieval • Computing methodologies➝Massively parallel and high-performance simulations.

  8. Underground Test Area Subproject Phase I Data Analysis Task. Volume VIII - Risk Assessment Documentation Package

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-12-01

    Volume VIII of the documentation for the Phase I Data Analysis Task performed in support of the current Regional Flow Model, Transport Model, and Risk Assessment for the Nevada Test Site Underground Test Area Subproject contains the risk assessment documentation. Because of the size and complexity of the model area, a considerable quantity of data was collected and analyzed in support of the modeling efforts. The data analysis task was consequently broken into eight subtasks, and descriptions of each subtask's activities are contained in one of the eight volumes that comprise the Phase I Data Analysis Documentation.

  9. Examination to assess the clinical examination and documentation of spine pathology among orthopedic residents.

    Science.gov (United States)

    Haglin, Jack M; Zeller, John L; Egol, Kenneth A; Phillips, Donna P

    2017-12-01

    The Accreditation Council for Graduate Medical Education (ACGME) guidelines requires residency programs to teach and evaluate residents in six overarching "core competencies" and document progress through educational milestones. To assess the progress of orthopedic interns' skills in performing a history, physical examination, and documentation of the encounter for a standardized patient with spinal stenosis, an objective structured clinical examination (OSCE) was conducted for 13 orthopedic intern residents, following a 1-month boot camp that included communications skills and curriculum in history and physical examination. Interns were objectively scored based on their performance of the physical examination, communication skills, completeness and accuracy of their electronic medical record (EMR), and their diagnostic conclusions gleaned from the patient encounter. The purpose of this study was to meaningfully assess the clinical skills of orthopedic post-graduate year (PGY)-1 interns. The findings can be used to develop a standardized curriculum for documenting patient encounters and highlight common areas of weakness among orthopedic interns with regard to the spine history and physical examination and conducting complete and accurate clinical documentation. A major orthopedic specialty hospital and academic medical center. Thirteen PGY-1 orthopedic residents participated in the OSCE with the same standardized patient presenting with symptoms and radiographs consistent with spinal stenosis. Videos of the encounters were independently viewed and objectively evaluated by one investigator in the study. This evaluation focused on the completeness of the history and the performance and completion of the physical examination. The standardized patient evaluated the communication skills of each intern with a separate objective evaluation. Interns completed these same scoring guides to evaluate their own performance in history, physical examination, and communications

  10. The grout/glass performance assessment code system (GPACS) with verification and benchmarking

    International Nuclear Information System (INIS)

    Piepho, M.G.; Sutherland, W.H.; Rittmann, P.D.

    1994-12-01

    GPACS is a computer code system for calculating water flow (unsaturated or saturated), solute transport, and human doses due to the slow release of contaminants from a waste form (in particular grout or glass) through an engineered system and through a vadose zone to an aquifer, well and river. This dual-purpose document is intended to serve as a user's guide and verification/benchmark document for the Grout/Glass Performance Assessment Code system (GPACS). GPACS can be used for low-level-waste (LLW) Glass Performance Assessment and many other applications including other low-level-waste performance assessments and risk assessments. Based on all the cses presented, GPACS is adequate (verified) for calculating water flow and contaminant transport in unsaturated-zone sediments and for calculating human doses via the groundwater pathway

  11. Implementation of a Document Management System in an Operating Nuclear Power Plan

    International Nuclear Information System (INIS)

    Martinez Ladron de Guevara, J.

    1996-01-01

    The difficulty of implementing a document management system in an operating nuclear power plant basically lies in the high volume of information to be handled, in the different storage devices used and in the complexity of relations existing between the documentation and the physical elements of the facility. The documentation used in a power plant, mainly technical, is often stored on different devices (paper, microfilm, aperture cards, test files, vector files, raster files, etc) and usually features various identification criteria (engineering, manufacturing, plant staff, etc). Consequently, the system must be aimed at the management of multiformatted documentation, providing appropriate means of identification, capture and display for each case. The document management system must satisfy all information needs of each department of the plant, and should be adapted to the work cycles of the plant. Moreover, it should be integrated into other computer application in operation (maintenance, operation, procurement, etc), so that links can be established between the documentation and configuration elements. Although this is a complex procedure in operating power plants, there are integrating tools that facilitate the gradual implementation of this type of system. (Author)

  12. Software simulator for property investigation of document management system with RFID tags

    Directory of Open Access Journals (Sweden)

    Kiedrowicz Maciej

    2016-01-01

    Full Text Available The study outlines the method for examining the properties of the RFID-tagged document management system. The system is composed of computers, where the software for supporting processes of the RFID-tagged doc-uments was installed. Furthermore, the system cooperates with many other elements of the secret office (cabinets, sluices, photocopiers, desks. The examination of the properties of the RFID-tagged document management system is, in this case, complex due to the number of a possible examination scenarios. The simulation method for examining the system properties was proposed. It allows to conduct the examination of the properties in a short period of time for numerous testing scenarios.

  13. Simulation Technology Laboratory Building 970 hazards assessment document

    International Nuclear Information System (INIS)

    Wood, C.L.; Starr, M.D.

    1994-11-01

    The Department of Energy Order 5500.3A requires facility-specific hazards assessments be prepared, maintained, and used for emergency planning purposes. This hazards assessment document describes the chemical and radiological hazards associated with the Simulation Technology Laboratory, Building 970. The entire inventory was screened according to the potential airborne impact to onsite and offsite individuals. The air dispersion model, ALOHA, estimated pollutant concentrations downwind from the source of a release, taking into consideration the toxicological and physical characteristics of the release site, the atmospheric conditions, and the circumstances of the release. The greatest distances at which a postulated facility event will produce consequences exceeding the ERPG-2 and Early Severe Health Effects thresholds are 78 and 46 meters, respectively. The highest emergency classification is a Site Area Emergency. The Emergency Planning Zone is 100 meters

  14. Methodology for assessing performance of waste management systems

    International Nuclear Information System (INIS)

    Meshkov, N.K.; Herzenberg, C.L.; Camasta, S.F.

    1988-01-01

    The newly revised draft DOE Order 5820.2, Chapter 3, requires that DOE low-level waste shall be managed on a systematic basis using the most appropriate combination of waste generation reduction, segregation, treatment, and disposal practices so that the radioactive components are contained and the overall cost effectiveness is minimized. This order expects each site to prepare and maintain an overall waste management systems performance assessment supporting the combination of waste management practices used in generation reduction segregation, treatment, packaging, storage, and disposal. A document prepared by EG and G Idaho, Inc. for the Department of Energy called Guidance for Conduct of Waste Management Systems Performance Assessment is specifically intended to provide the approach necessary to meet the systems performance assessment requirement of DOE Order 5820.2, Chapter 3, and other applicable state regulations dealing with LLW (low-level radioactive wastes). Methods and procedures are needed for assessing the performance of a waste management system. This report addresses this need. The purpose of the methodology provided in this report is to select the optimal way to manage particular sets of waste streams from generation to disposal in a safe and cost-effective manner, and thereby assist the DOE LLW mangers in complying with the DOE Order 5820.2, Chapter 3, and the associated guidance document

  15. Large Scale Document Inversion using a Multi-threaded Computing System

    Science.gov (United States)

    Jung, Sungbo; Chang, Dar-Jen; Park, Juw Won

    2018-01-01

    Current microprocessor architecture is moving towards multi-core/multi-threaded systems. This trend has led to a surge of interest in using multi-threaded computing devices, such as the Graphics Processing Unit (GPU), for general purpose computing. We can utilize the GPU in computation as a massive parallel coprocessor because the GPU consists of multiple cores. The GPU is also an affordable, attractive, and user-programmable commodity. Nowadays a lot of information has been flooded into the digital domain around the world. Huge volume of data, such as digital libraries, social networking services, e-commerce product data, and reviews, etc., is produced or collected every moment with dramatic growth in size. Although the inverted index is a useful data structure that can be used for full text searches or document retrieval, a large number of documents will require a tremendous amount of time to create the index. The performance of document inversion can be improved by multi-thread or multi-core GPU. Our approach is to implement a linear-time, hash-based, single program multiple data (SPMD), document inversion algorithm on the NVIDIA GPU/CUDA programming platform utilizing the huge computational power of the GPU, to develop high performance solutions for document indexing. Our proposed parallel document inversion system shows 2-3 times faster performance than a sequential system on two different test datasets from PubMed abstract and e-commerce product reviews. CCS Concepts •Information systems➝Information retrieval • Computing methodologies➝Massively parallel and high-performance simulations.

  16. B Plant low level waste system integrity assessment report

    International Nuclear Information System (INIS)

    Walter, E.J.

    1995-09-01

    This document provides the report of the integrity assessment activities for the B Plant low level waste system. The assessment activities were in response to requirements of the Washington State Dangerous Waste Regulations, Washington Administrative Code (WAC), 173-303-640. This integrity assessment report supports compliance with Hanford Federal Facility Agreement and Consent Order interim milestone target action M-32-07-T03

  17. [Document management systems to support quality management systems at university hospitals - an interview-based study].

    Science.gov (United States)

    Holderried, Martin; Bökel, Ann-Catrin; Ochsmann, Elke

    2018-05-01

    In order to save and control the processes and quality of medical services, a suitable steering system of all relevant documents is essential from the point of view of clinical quality management. Systems supporting an automated steering system of documents are called document management systems (DMS), and they also enter the healthcare sector. The use of DMS in the German healthcare sector has hardly been investigated so far. To close this knowledge gap, interviews were carried out with German university hospitals over a six-month period and subjected to a qualitative content analysis according to Mayring. In total, 25 university hospitals agreed to participate in this study, 19 of which have been working with a digital DMS for about six years on average. There was a great variety among the IT systems used. Document management and usability of the DMS as well as its integration into existing IT structures were key decision-making criteria for the selection of a digital DMS. In general, the long-term usability of the DMS is supported by regular evaluation of one's own requirements for the system, administration and training programs. In addition, DMS have a positive effect on patient safety and the quality of medical care. Copyright © 2018. Published by Elsevier GmbH.

  18. Multimodal document management in radiotherapy

    International Nuclear Information System (INIS)

    Fahrner, H.; Kirrmann, S.; Roehner, F.; Schmucker, M.; Hall, M.; Heinemann, F.

    2013-01-01

    Background and purpose: After incorporating treatment planning and the organisational model of treatment planning in the operating schedule system (BAS, 'Betriebsablaufsystem'), complete document qualities were embedded in the digital environment. The aim of this project was to integrate all documents independent of their source (paper-bound or digital) and to make content from the BAS available in a structured manner. As many workflow steps as possible should be automated, e.g. assigning a document to a patient in the BAS. Additionally it must be guaranteed that at all times it could be traced who, when, how and from which source documents were imported into the departmental system. Furthermore work procedures should be changed that the documentation conducted either directly in the departmental system or from external systems can be incorporated digitally and paper document can be completely avoided (e.g. documents such as treatment certificate, treatment plans or documentation). It was a further aim, if possible, to automate the removal of paper documents from the departmental work flow, or even to make such paper documents superfluous. In this way patient letters for follow-up appointments should automatically generated from the BAS. Similarly patient record extracts in the form of PDF files should be enabled, e.g. for controlling purposes. Method: The available document qualities were analysed in detail by a multidisciplinary working group (BAS-AG) and after this examination and assessment of the possibility of modelling in our departmental workflow (BAS) they were transcribed into a flow diagram. The gathered specifications were implemented in a test environment by the clinical and administrative IT group of the department of radiation oncology and subsequent to a detailed analysis introduced into clinical routine. Results: The department has succeeded under the conditions of the aforementioned criteria to embed all relevant documents in the departmental

  19. Model documentation renewable fuels module of the National Energy Modeling System

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    This report documents the objectives, analytical approach, and design of the National Energy Modeling System (NEMS) Renewable Fuels Module (RFM) as it relates to the production of the 1997 Annual Energy Outlook forecasts. The report catalogues and describes modeling assumptions, computational methodologies, data inputs. and parameter estimation techniques. A number of offline analyses used in lieu of RFM modeling components are also described. This documentation report serves three purposes. First, it is a reference document for model analysts, model users, and the public interested in the construction and application of the RFM. Second, it meets the legal requirement of the Energy Information Administration (EIA) to provide adequate documentation in support of its models. Finally, such documentation facilitates continuity in EIA model development by providing information sufficient to perform model enhancements and data updates as part of EIA`s ongoing mission to provide analytical and forecasting information systems.

  20. Model documentation renewable fuels module of the National Energy Modeling System

    International Nuclear Information System (INIS)

    1997-04-01

    This report documents the objectives, analytical approach, and design of the National Energy Modeling System (NEMS) Renewable Fuels Module (RFM) as it relates to the production of the 1997 Annual Energy Outlook forecasts. The report catalogues and describes modeling assumptions, computational methodologies, data inputs. and parameter estimation techniques. A number of offline analyses used in lieu of RFM modeling components are also described. This documentation report serves three purposes. First, it is a reference document for model analysts, model users, and the public interested in the construction and application of the RFM. Second, it meets the legal requirement of the Energy Information Administration (EIA) to provide adequate documentation in support of its models. Finally, such documentation facilitates continuity in EIA model development by providing information sufficient to perform model enhancements and data updates as part of EIA's ongoing mission to provide analytical and forecasting information systems

  1. The documentation of product configuration systems: A framework and an IT solution

    DEFF Research Database (Denmark)

    Shafiee, Sara; Hvam, Lars; Haug, Anders

    2017-01-01

    for maintenance, further development, system quality and communication with domain experts. Product models are the main communication and documentation tools used in PCS projects. Recent studies have shown that up-to-date documentation for the PCS is often lacking due to the significant amount of work required...... system is proposed that is capable of retrieving knowledge from the PCS and thus generating the product model. Our framework and IT documentation system were developed and tested at a case company on five different projects. The results confirm that benefits can be achieved by using the proposed...

  2. A Practical Risk Assessment Methodology for Safety-Critical Train Control Systems

    Science.gov (United States)

    2009-07-01

    This project proposes a Practical Risk Assessment Methodology (PRAM) for analyzing railroad accident data and assessing the risk and benefit of safety-critical train control systems. This report documents in simple steps the algorithms and data input...

  3. Pakistan, Sindh Province - Baseline Indicators System : Baseline Procurement Performance Assessment Report

    OpenAIRE

    World Bank

    2009-01-01

    This document provides an assessment of the public procurement system in Sindh province using the baseline indicators system developed by the Development Assistance Committee of the Organization for Economic Cooperation and Development (OECD-DAC). This assessment, interviews and discussions were held with stakeholders from the public and private sectors as well as civil society. Developing...

  4. Field-Testing a PC Electronic Documentation System using the Clinical Care Classification© System with Nursing Students

    Directory of Open Access Journals (Sweden)

    Jennifer E. Mannino

    2011-01-01

    Full Text Available Schools of nursing are slow in training their students to keep up with the fast approaching era of electronic healthcare documentation. This paper discusses the importance of nursing documentation, and describes the field-testing of an electronic health record, the Sabacare Clinical Care Classification (CCC© system. The PC-CCC©, designed as a Microsoft Access® application, is an evidence-based electronic documentation system available via free download from the internet. A sample of baccalaureate nursing students from a mid-Atlantic private college used this program to document the nursing care they provided to patients during their sophomore level clinical experience. This paper summarizes the design, training, and evaluation of using the system in practice.

  5. Documenting control system functionality for digital control implementations

    International Nuclear Information System (INIS)

    Harber, J.; Borairi, M.; Tikku, S.; Josefowicz, A.

    2006-01-01

    In past CANDU designs, plant control was accomplished by a combination of digital control computers, analogue controllers, and hardwired relay logic. Functionality for these various control systems, each using different hardware, was documented in varied formats such as text based program specifications, relay logic diagrams, and other various specification documents. The choice of formats was influenced by the hardware used and often required different specialized skills for different applications. The programmable electronic systems in new CANDU designs are realized in a manner consistent with latest international standards (e.g., the IEC 61513 standard). New CANDU designs make extensive use of modern digital control technology, with the benefit that functionality can be implemented on a limited number of control platforms, reducing development and maintenance cost. This approach can take advantage of tools that allow the plant control system functional and performance requirements to be documented using graphical representations. Modern graphical methods supplemented by information databases can be used to provide a clear and comprehensive set of requirements for software and system development. Overview diagrams of system functionality provide a common understanding of the system boundaries and interfaces. Important requirements are readily traced through the development process. This improved reviewability helps to ensure consistency with the safety and and production design requirements of the system. Encapsulation of commonly used functions into custom-defined function blocks, such as typical motor control centre interfaces, process interlocks, median selects etc, eases the burden on designers to understand and analyze the detailed functionality of each instance of use of this logic. A library of encapsulated functions will be established for complex functions that are reused in the control logic development. By encapsulation and standardisation of such

  6. Documentation Driven Development for Complex Real-Time Systems

    Science.gov (United States)

    2004-12-01

    This paper presents a novel approach for development of complex real - time systems , called the documentation-driven development (DDD) approach. This... time systems . DDD will also support automated software generation based on a computational model and some relevant techniques. DDD includes two main...stakeholders to be easily involved in development processes and, therefore, significantly improve the agility of software development for complex real

  7. SURFACE INDUSTRIAL HVAC SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    M.M. Ansari

    2005-04-05

    The purpose of this system description document (SDD) is to establish requirements that drive the design of the surface industrial heating, ventilation, and air-conditioning (HVAC) system and its bases to allow the design effort to proceed to license application. This SDD will be revised at strategic points as the design matures. This SDD identifies the requirements and describes the system design, as it currently exists, with emphasis on attributes of the design provided to meet the requirements. This SDD is an engineering tool for design control; accordingly, the primary audience and users are design engineers. This SDD is part of an iterative design process. It leads the design process with regard to the flowdown of upper tier requirements onto the system. Knowledge of these requirements is essential to performing the design process. The SDD follows the design with regard to the description of the system. The description that provided in this SDD reflects the current results of the design process.

  8. SNF/HLW Transfer System Description Document

    International Nuclear Information System (INIS)

    W. Holt

    2005-01-01

    The purpose of this system description document (SDD) is to establish requirements that drive the design of the spent nuclear fuel (SNF)/high-level radioactive waste (HLW) transfer system and associated bases, which will allow the design effort to proceed to license application. This SDD will be revised at strategic points as the design matures. This SDD identifies the requirements and describes the system design, as it currently exists, with emphasis on attributes of the design provided to meet the requirements. This SDD is an engineering tool for design control. Accordingly, the primary audience and users are design engineers. This SDD is part of an iterative design process. It leads the design process with regard to the flowdown of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. The SDD follows the design with regard to the description of the system. The description provided in this SDD reflects the current results of the design process

  9. Molten Salt Reactor Experiment Facility (Building 7503) standards/requirements identification document adherence assessment plan at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-02-01

    This is the Phase 2 (adherence) assessment plan for the Building 7503 Molten Salt Reactor Experiment (MSRE) Facility standards/requirements identification document (S/RID). This document outlines the activities to be conducted from FY 1996 through FY 1998 to ensure that the standards and requirements identified in the MSRE S/RID are being implemented properly. This plan is required in accordance with the Department of Energy Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 90-2, November 9, 1994, Attachment 1A. This plan addresses the major aspects of the adherence assessment and will be consistent with Energy Systems procedure QA-2. 7 ''Surveillances.''

  10. Information Management Platform for Data Analytics and Aggregation (IMPALA) System Design Document

    Science.gov (United States)

    Carnell, Andrew; Akinyelu, Akinyele

    2016-01-01

    The System Design document tracks the design activities that are performed to guide the integration, installation, verification, and acceptance testing of the IMPALA Platform. The inputs to the design document are derived from the activities recorded in Tasks 1 through 6 of the Statement of Work (SOW), with the proposed technical solution being the completion of Phase 1-A. With the documentation of the architecture of the IMPALA Platform and the installation steps taken, the SDD will be a living document, capturing the details about capability enhancements and system improvements to the IMPALA Platform to provide users in development of accurate and precise analytical models. The IMPALA Platform infrastructure team, data architecture team, system integration team, security management team, project manager, NASA data scientists and users are the intended audience of this document. The IMPALA Platform is an assembly of commercial-off-the-shelf (COTS) products installed on an Apache-Hadoop platform. User interface details for the COTS products will be sourced from the COTS tools vendor documentation. The SDD is a focused explanation of the inputs, design steps, and projected outcomes of every design activity for the IMPALA Platform through installation and validation.

  11. L-Band Digital Aeronautical Communications System Engineering - Initial Safety and Security Risk Assessment and Mitigation

    Science.gov (United States)

    Zelkin, Natalie; Henriksen, Stephen

    2011-01-01

    This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." ITT has completed a safety hazard analysis providing a preliminary safety assessment for the proposed L-band (960 to 1164 MHz) terrestrial en route communications system. The assessment was performed following the guidelines outlined in the Federal Aviation Administration Safety Risk Management Guidance for System Acquisitions document. The safety analysis did not identify any hazards with an unacceptable risk, though a number of hazards with a medium risk were documented. This effort represents a preliminary safety hazard analysis and notes the triggers for risk reassessment. A detailed safety hazards analysis is recommended as a follow-on activity to assess particular components of the L-band communication system after the technology is chosen and system rollout timing is determined. The security risk analysis resulted in identifying main security threats to the proposed system as well as noting additional threats recommended for a future security analysis conducted at a later stage in the system development process. The document discusses various security controls, including those suggested in the COCR Version 2.0.

  12. Electronic document management system analysis report and system plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    Frappaolo, C.

    1995-09-01

    Lockheed Martin Energy Systems, Inc. (LMES) has established and maintains Document Management Centers (DMCs) to support Environmental Restoration Program (ER) activities undertaken at three Oak Ridge facilities: Oak Ridge National Laboratory, Oak Ridge K-25 Site, Oak Ridge Y-12 Plant; and two sister sites: Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio, and Paducah Gaseous Diffusion Plant in Paducah, Kentucky. The role of the DMCs is to receive, store, retrieve, and properly dispose of records. In an effort to make the DMCs run more efficiently and to more proactively manage the records' life cycles from cradle to grave, ER has decided to investigate ways in which Electronic Document Management System (EDMS) technologies can be used to redefine the DMCs and their related processes. Specific goals of this study are tightening control over the ER documents, establishing and enforcing record creation and retention procedures, speeding up access to information, and increasing the accessibility of information. A working pilot of the solution is desired within the next six months. Based on a series of interviews conducted with personnel from each of the DMCs, key management, and individuals representing related projects, it is recommended that ER utilize document management, full-text retrieval, and workflow technologies to improve and automate records management for the ER program. A phased approach to solution implementation is suggested starting with the deployment of an automated storage and retrieval system at Portsmouth. This should be followed with a roll out of the system to the other DMCs, the deployment of a workflow-enabled authoring system at Portsmouth, and a subsequent roll out of this authoring system to the other sites

  13. Mixed waste characterization reference document

    International Nuclear Information System (INIS)

    1997-09-01

    Waste characterization and monitoring are major activities in the management of waste from generation through storage and treatment to disposal. Adequate waste characterization is necessary to ensure safe storage, selection of appropriate and effective treatment, and adherence to disposal standards. For some wastes characterization objectives can be difficult and costly to achieve. The purpose of this document is to evaluate costs of characterizing one such waste type, mixed (hazardous and radioactive) waste. For the purpose of this document, waste characterization includes treatment system monitoring, where monitoring is a supplement or substitute for waste characterization. This document establishes a cost baseline for mixed waste characterization and treatment system monitoring requirements from which to evaluate alternatives. The cost baseline established as part of this work includes costs for a thermal treatment technology (i.e., a rotary kiln incinerator), a nonthermal treatment process (i.e., waste sorting, macronencapsulation, and catalytic wet oxidation), and no treatment (i.e., disposal of waste at the Waste Isolation Pilot Plant (WIPP)). The analysis of improvement over the baseline includes assessment of promising areas for technology development in front-end waste characterization, process equipment, off gas controls, and monitoring. Based on this assessment, an ideal characterization and monitoring configuration is described that minimizes costs and optimizes resources required for waste characterization

  14. Sandia Administrative Micrographics Facility, Building 802: Hazards assessment document

    International Nuclear Information System (INIS)

    Swihart, A.

    1994-12-01

    The Department of Energy Order 5500.3A requires facility-specific hazards assessments be prepared, maintained, and used for emergency planning purposes. This hazards assessment document describes the chemical and radiological hazards associated with the Sandia Administrative Micrographics Facility, Building 802. The entire inventory was screened according to the potential airborne impact to onsite and offsite individuals. The air dispersion model, ALOHA, estimated pollutant concentrations downwind from the source of a release, taking into consideration the toxicological and physical characteristics of the release site, the atmospheric conditions, and the circumstances of the release. The greatest distance at which a postulated facility event will produce consequences exceeding the Early Severe Health Effects threshold is 33 meters. The highest emergency classification is a Site Area Emergency. The Emergency Planning Zone is 75 meters

  15. BASINs 4.0 Climate Assessment Tool (CAT): Supporting Documentation and User's Manual (Final Report)

    Science.gov (United States)

    EPA announced the availability of the report, BASINS 4.0 Climate Assessment Tool (CAT): Supporting Documentation and User's Manual. This report was prepared by the EPA's Global Change Research Program (GCRP), an assessment-oriented program, that sits within the Office of R...

  16. Honeywell Modular Automation System Computer Software Documentation

    International Nuclear Information System (INIS)

    STUBBS, A.M.

    2000-01-01

    The purpose of this Computer Software Document (CSWD) is to provide configuration control of the Honeywell Modular Automation System (MAS) in use at the Plutonium Finishing Plant (PFP). This CSWD describes hardware and PFP developed software for control of stabilization furnaces. The Honeywell software can generate configuration reports for the developed control software. These reports are described in the following section and are attached as addendum's. This plan applies to PFP Engineering Manager, Thermal Stabilization Cognizant Engineers, and the Shift Technical Advisors responsible for the Honeywell MAS software/hardware and administration of the Honeywell System

  17. Designing an Electronic Patient Management System for Multiple Sclerosis: Building a Next Generation Multiple Sclerosis Documentation System.

    Science.gov (United States)

    Kern, Raimar; Haase, Rocco; Eisele, Judith Christina; Thomas, Katja; Ziemssen, Tjalf

    2016-01-08

    Technologies like electronic health records or telemedicine devices support the rapid mediation of health information and clinical data independent of time and location between patients and their physicians as well as among health care professionals. Today, every part of the treatment process from diagnosis, treatment selection, and application to patient education and long-term care may be enhanced by a quality-assured implementation of health information technology (HIT) that also takes data security standards and concerns into account. In order to increase the level of effectively realized benefits of eHealth services, a user-driven needs assessment should ensure the inclusion of health care professional perspectives into the process of technology development as we did in the development process of the Multiple Sclerosis Documentation System 3D. After analyzing the use of information technology by patients suffering from multiple sclerosis, we focused on the needs of neurological health care professionals and their handling of health information technology. Therefore, we researched the status quo of eHealth adoption in neurological practices and clinics as well as health care professional opinions about potential benefits and requirements of eHealth services in the field of multiple sclerosis. We conducted a paper-and-pencil-based mail survey in 2013 by sending our questionnaire to 600 randomly chosen neurological practices in Germany. The questionnaire consisted of 24 items covering characteristics of participating neurological practices (4 items), the current use of network technology and the Internet in such neurological practices (5 items), physicians' attitudes toward the general and MS-related usefulness of eHealth systems (8 items) and toward the clinical documentation via electronic health records (4 items), and physicians' knowledge about the Multiple Sclerosis Documentation System (3 items). From 600 mailed surveys, 74 completed surveys were returned

  18. Assessment model validity document FARF31

    International Nuclear Information System (INIS)

    Elert, Mark; Gylling Bjoern; Lindgren, Maria

    2004-08-01

    -fractures with flowing water and rock with porosity accessible only by diffusion. The approach furthermore assumes that the properties within the two porosity domains are averaged and also the transfer between the two domains is averaged.It is an important validation issue to verify that effective averaging of parameters can be performed and that suitable values can be derived. It can be shown that matrix interaction properties along a flow path can be integrated to an effective value and if the matrix depth can be considered as infinite, effective values may be derived also for the diffusion and sorption parameters. Thus, it is possible to derive effective parameters for sorbing radionuclides incorporating the total matrix effects along a flow path. This is strictly valid only for cases with no dispersion, but gives a good approximation as long as dispersion does not dominate the transport. FARF31 has been tested and compared with analytical solutions and other models and was found to correspond well within a wide range of input parameters. Support and documentation on how to use FARF31 are two important components to avoid calculation mistakes and obtain trustworthy results. The documentation describes handling and updates of the code. Test cases have been constructed which can be used to check updates and be used as templates. The development of the code is kept under source code control to fulfil quality assurance. The model is deemed to be well suited for performance assessments within the SKB framework

  19. Program prioritization system user requirements document for Gas Cooled Reactor Associates

    International Nuclear Information System (INIS)

    1981-01-01

    Efficient management of the national HTGR program requires the establishment of an information system that will facilitate a more rational allocation of resources and task prioritization consistent with program policies. The system described in this document provides a data analysis mechanism for processing top level summary status and planning information in a rapid, timely and selective manner. Data produced by the system can be used by management to provide a rational basis for prioritizing tasks, evaluating program changes and program planning regarding costs, schedules and overall program development logic. The purpose of this document is to delineate the program prioritization system (PPS) requirements for use as a guide to acquiring and implementing the system

  20. Independent Orbiter Assessment (IOA): Assessment of the data processing system FMEA/CIL

    Science.gov (United States)

    Lowery, H. J.; Haufler, W. A.

    1986-01-01

    The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA effort first completed an analysis of the Data Processing System (DPS) hardware, generating draft failure modes and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The IOA results were then compared to the NASA FMEA/CIL baseline with proposed Post 51-L updates included. A resolution of each discrepancy from the comparison is provided through additional analysis as required. The results of that comparison is documented for the Orbiter DPS hardware.

  1. Automated 741 document preparation: Oak Ridge National Laboratory's Automated Safeguards Information System (OASIS)

    International Nuclear Information System (INIS)

    Austin, H.C.; Gray, L.M.

    1982-01-01

    OASIS has been providing for Oak Ridge National Laboratory's total safeguards needs since being place on line in April 1980. The system supports near real-time nuclear materials safeguards and accountability control. The original design of OASIS called for an automated facsimile of a 741 document to be prepared as a functional by-product of updating the inventory. An attempt was made to utilize, intact, DOE-Albuquerque's automated 741 system to generate the facsimile; however, the five page document produced proved too cumbersome. Albuquerque's programs were modified to print an original 741 document utilizing standard DOE/NRC 741 forms. It is felt that the best features of both the automated and manually generated 741 documents have been incorporated. Automation of the source data for 741 shipping documents produces greater efficiency while reducing possible errors. Through utilization of the standard DOE/NRC form, continuity within the NMMSS system is maintained, thus minimizing the confusion and redundancy associated with facsimiles. OASIS now fulfills the original concept of near real-time accountability by furnishing a viable 741 document as a function of updating the inventory

  2. Automated systems to identify relevant documents in product risk management

    Science.gov (United States)

    2012-01-01

    Background Product risk management involves critical assessment of the risks and benefits of health products circulating in the market. One of the important sources of safety information is the primary literature, especially for newer products which regulatory authorities have relatively little experience with. Although the primary literature provides vast and diverse information, only a small proportion of which is useful for product risk assessment work. Hence, the aim of this study is to explore the possibility of using text mining to automate the identification of useful articles, which will reduce the time taken for literature search and hence improving work efficiency. In this study, term-frequency inverse document-frequency values were computed for predictors extracted from the titles and abstracts of articles related to three tumour necrosis factors-alpha blockers. A general automated system was developed using only general predictors and was tested for its generalizability using articles related to four other drug classes. Several specific automated systems were developed using both general and specific predictors and training sets of different sizes in order to determine the minimum number of articles required for developing such systems. Results The general automated system had an area under the curve value of 0.731 and was able to rank 34.6% and 46.2% of the total number of 'useful' articles among the first 10% and 20% of the articles presented to the evaluators when tested on the generalizability set. However, its use may be limited by the subjective definition of useful articles. For the specific automated system, it was found that only 20 articles were required to develop a specific automated system with a prediction performance (AUC 0.748) that was better than that of general automated system. Conclusions Specific automated systems can be developed rapidly and avoid problems caused by subjective definition of useful articles. Thus the efficiency of

  3. An integrated information retrieval and document management system

    Science.gov (United States)

    Coles, L. Stephen; Alvarez, J. Fernando; Chen, James; Chen, William; Cheung, Lai-Mei; Clancy, Susan; Wong, Alexis

    1993-01-01

    This paper describes the requirements and prototype development for an intelligent document management and information retrieval system that will be capable of handling millions of pages of text or other data. Technologies for scanning, Optical Character Recognition (OCR), magneto-optical storage, and multiplatform retrieval using a Standard Query Language (SQL) will be discussed. The semantic ambiguity inherent in the English language is somewhat compensated-for through the use of coefficients or weighting factors for partial synonyms. Such coefficients are used both for defining structured query trees for routine queries and for establishing long-term interest profiles that can be used on a regular basis to alert individual users to the presence of relevant documents that may have just arrived from an external source, such as a news wire service. Although this attempt at evidential reasoning is limited in comparison with the latest developments in AI Expert Systems technology, it has the advantage of being commercially available.

  4. A maintenance support system with document handling capability

    International Nuclear Information System (INIS)

    Fukumoto, A.; Tsumura, K.; Fujii, M.; Tai, I.; Makimo, M.; Watanabe, T.

    1990-01-01

    An operation and maintenance support system, called 'Advanced Man-Machine System for Nuclear Power Plants' (MMS-NPP) is under development with the support of the Japanese Government. Taking full advantage of Artificial Intelligence technology, the system aims to enhance the capability of already developed 'Computerized Operator Support System (COSS)' and gives wider and more advanced support for operation and maintenance. With a brief overview of MMS-NPP, this paper describes a support system for plant patrol and equipment inspection. The system gives guidance for plant patrol and for equipment inspection and provides easy access to plant drawings and documents. A unique knowledge acquisition method, utilizing image processing technology, was proposed in building the system

  5. A Document Analysis of Teacher Evaluation Systems Specific to Physical Education

    Science.gov (United States)

    Norris, Jason M.; van der Mars, Hans; Kulinna, Pamela; Kwon, Jayoun; Amrein-Beardsley, Audrey

    2017-01-01

    Purpose: The purpose of this document analysis study was to examine current teacher evaluation systems, understand current practices, and determine whether the instrumentation is a valid measure of teaching quality as reflected in teacher behavior and effectiveness specific to physical education (PE). Method: An interpretive document analysis…

  6. Space-reactor electric systems: subsystem technology assessment

    International Nuclear Information System (INIS)

    Anderson, R.V.; Bost, D.; Determan, W.R.

    1983-01-01

    This report documents the subsystem technology assessment. For the purpose of this report, five subsystems were defined for a space reactor electric system, and the report is organized around these subsystems: reactor; shielding; primary heat transport; power conversion and processing; and heat rejection. The purpose of the assessment was to determine the current technology status and the technology potentials for different types of the five subsystems. The cost and schedule needed to develop these potentials were estimated, and sets of development-compatible subsystems were identified

  7. Wind turbine environmental assessment -- Vol 1: Screening document

    International Nuclear Information System (INIS)

    2000-04-01

    The environmental effects of the proposed construction and operation of up to three wind turbines on the Toronto waterfront are evaluated in accordance with the requirements of the Canadian Environmental Assessment Act (CEAA) and Regulations. The nine sections of the report provide background on the environmental assessment and the wind turbine project; provide justification for the project and describes alternative sites and wind turbine technologies; outlines the scope of the project; sketches the biophysical and socio-economic environment; presents an evaluation of the environmental impacts and proposed mitigating measures; describes the public consultation program that was carried out; summarizes the comments received from interested parties; presents the conclusion of the environmental impact assessment; and responds to the public comments received on the draft screening document. Most of the concerns raised involved avoidance reactions by birds, disruption or fragmentation of wildlife, the potential for high kill rate of small nocturnal migrants and young birds, and the effect of noise on breeding birds. The overall recommendation of the consultants is that the project is not likely to cause significant adverse environmental effects and its construction and operations should be authorized. 115 refs., 8 tabs., 2 figs. (14 appendices are in volume 2)

  8. Automated software system for checking the structure and format of ACM SIG documents

    Science.gov (United States)

    Mirza, Arsalan Rahman; Sah, Melike

    2017-04-01

    Microsoft (MS) Office Word is one of the most commonly used software tools for creating documents. MS Word 2007 and above uses XML to represent the structure of MS Word documents. Metadata about the documents are automatically created using Office Open XML (OOXML) syntax. We develop a new framework, which is called ADFCS (Automated Document Format Checking System) that takes the advantage of the OOXML metadata, in order to extract semantic information from MS Office Word documents. In particular, we develop a new ontology for Association for Computing Machinery (ACM) Special Interested Group (SIG) documents for representing the structure and format of these documents by using OWL (Web Ontology Language). Then, the metadata is extracted automatically in RDF (Resource Description Framework) according to this ontology using the developed software. Finally, we generate extensive rules in order to infer whether the documents are formatted according to ACM SIG standards. This paper, introduces ACM SIG ontology, metadata extraction process, inference engine, ADFCS online user interface, system evaluation and user study evaluations.

  9. Electronic Document Management Systems: Where Are They Today?

    Science.gov (United States)

    Koulopoulos, Thomas M.; Frappaolo, Carl

    1993-01-01

    Discusses developments in document management systems based on a survey of over 400 corporations and government agencies. Text retrieval and imaging markets, architecture and integration, purchasing plans, and vendor market leaders are covered. Five graphs present data on user preferences for improvements. A sidebar article reviews the development…

  10. Computerising documentation

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The nuclear power generation industry is faced with public concern and government pressures over safety, efficiency and risk. Operators throughout the industry are addressing these issues with the aid of a new technology - technical document management systems (TDMS). Used for strategic and tactical advantage, the systems enable users to scan, archive, retrieve, store, edit, distribute worldwide and manage the huge volume of documentation (paper drawings, CAD data and film-based information) generated in building, maintaining and ensuring safety in the UK's power plants. The power generation industry has recognized that the management and modification of operation critical information is vital to the safety and efficiency of its power plants. Regulatory pressure from the Nuclear Installations Inspectorate (NII) to operate within strict safety margins or lose Site Licences has prompted the need for accurate, up-to-data documentation. A document capture and management retrieval system provides a powerful cost-effective solution, giving rapid access to documentation in a tightly controlled environment. The computerisation of documents and plans is discussed in this article. (Author)

  11. The Multimedia Environmental Pollutant Assessment System (MEPAS)reg-sign: Atmospheric pathway formulations. Revision

    International Nuclear Information System (INIS)

    Droppo, J.G.; Buck, J.W.

    1996-03-01

    The Multimedia Environmental Pollutant Assessment System (MEPAS) is an integrated software implementation of physics-based fate and transport models for health and environmental risk assessments of both radioactive and hazardous pollutants. This atmospheric component report is one of a series of formulation reports that document the MEPAS mathematical models. MEPAS is a multimedia model; pollutant transport is modeled within, through, and between multiple media (air, soil, groundwater, and surface water). The estimated concentrations in the various media are used to compute exposures and impacts to the environment, to maximum individuals, and to populations. The MEPAS atmospheric component for the air media documented in this report includes models for emission from a source to the air, initial plume rise and dispersion, airborne pollutant transport and dispersion, and deposition to soils and crops. The material in this report is documentation for MEPAS Versions 3.0 and 3.1 and the MEPAS version used in the Remedial Action Assessment System (RAAS) Version 1.0

  12. Customer interface document for the Molten Salt Test Loop (MSTL) system.

    Energy Technology Data Exchange (ETDEWEB)

    Pettit, Kathleen; Kolb, William J.; Gill, David Dennis; Briggs, Ronald D.

    2012-03-01

    The National Solar Thermal Test Facility at Sandia National Laboratories has a unique test capability called the Molten Salt Test Loop (MSTL) system. MSTL is a test capability that allows customers and researchers to test components in flowing, molten nitrate salt. The components tested can range from materials samples, to individual components such as flex hoses, ball joints, and valves, up to full solar collecting systems such as central receiver panels, parabolic troughs, or linear Fresnel systems. MSTL provides realistic conditions similar to a portion of a concentrating solar power facility. The facility currently uses 60/40 nitrate 'solar salt' and can circulate the salt at pressure up to 600psi, temperature to 585 C, and flow rate of 400-600GPM depending on temperature. The purpose of this document is to provide a basis for customers to evaluate the applicability to their testing needs, and to provide an outline of expectations for conducting testing on MSTL. The document can serve as the basis for testing agreements including Work for Others (WFO) and Cooperative Research and Development Agreements (CRADA). While this document provides the basis for these agreements and describes some of the requirements for testing using MSTL and on the site at Sandia, the document is not sufficient by itself as a test agreement. The document, however, does provide customers with a uniform set of information to begin the test planning process.

  13. Gamma radiation effects on physical properties of parchment documents: Assessment of Dmax

    International Nuclear Information System (INIS)

    Nunes, Inês; Mesquita, Nuno; Cabo Verde, Sandra; João Trigo, Maria; Ferreira, Armando; Manuela Carolino, Maria; Portugal, António; Luísa Botelho, Maria

    2012-01-01

    Parchments are important documents that give testimony for History; therefore these materials should be respected and preserved. Considering incremental biodeterioration problems that have to be faced daily, the Archive of the University of Coimbra (AUC) is involved in different scientific projects in order to evaluate and determine new methods for document decontamination and preservation. The aim of this study was to evaluate gamma radiation effects on the colour and texture of the AUC parchment documents. The assessment of these effects was used to estimate the maximum gamma radiation dose (D max ) that could guarantee parchment documents′ decontamination treatment, without significant alteration of their physical properties. Parchment samples were exposed to gamma radiation doses ranging from 10 to 30 kGy. The texture and colour of samples were assessed before and after the irradiation procedure, using a texture analyser and an electronic colorimeter. Hardness and springiness were determined based on texture spectra. Lightness (L⁎), Chroma (C), greenness vs. redness (a*) and yellowness vs. blueness (b*) values were obtained from colorimetric measures. Results indicate no significant effects of gamma radiation on the texture and colour of parchment for the studied doses. - Highlights: ► Study on the effects of gamma radiation in parchment physical properties. ► Evaluation of the uniformity of parchment samples′ physical parameters. ► Proposal of a maximum gamma radiation dose for parchment decontamination treatment.

  14. C-Band Airport Surface Communications System Engineering-Initial High-Level Safety Risk Assessment and Mitigation

    Science.gov (United States)

    Zelkin, Natalie; Henriksen, Stephen

    2011-01-01

    This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." ITT has completed a safety hazard analysis providing a preliminary safety assessment for the proposed C-band (5091- to 5150-MHz) airport surface communication system. The assessment was performed following the guidelines outlined in the Federal Aviation Administration Safety Risk Management Guidance for System Acquisitions document. The safety analysis did not identify any hazards with an unacceptable risk, though a number of hazards with a medium risk were documented. This effort represents an initial high-level safety hazard analysis and notes the triggers for risk reassessment. A detailed safety hazards analysis is recommended as a follow-on activity to assess particular components of the C-band communication system after the profile is finalized and system rollout timing is determined. A security risk assessment has been performed by NASA as a parallel activity. While safety analysis is concerned with a prevention of accidental errors and failures, the security threat analysis focuses on deliberate attacks. Both processes identify the events that affect operation of the system; and from a safety perspective the security threats may present safety risks.

  15. NASAwide electronic publishing system: Prototype STI electronic document distribution, stage-4 evaluation report

    Science.gov (United States)

    Tuey, Richard C.; Collins, Mary; Caswell, Pamela; Haynes, Bob; Nelson, Michael L.; Holm, Jeanne; Buquo, Lynn; Tingle, Annette; Cooper, Bill; Stiltner, Roy

    1996-01-01

    This evaluation report contains an introduction, seven chapters, and five appendices. The Introduction describes the purpose, conceptual frame work, functional description, and technical report server of the STI Electronic Document Distribution (EDD) project. Chapter 1 documents the results of the prototype STI EDD in actual operation. Chapter 2 documents each NASA center's post processing publication processes. Chapter 3 documents each center's STI software, hardware, and communications configurations. Chapter 7 documents STI EDD policy, practices, and procedures. The appendices, which arc contained in Part 2 of this document, consist of (1) STI EDD Project Plan, (2) Team members, (3) Phasing Schedules, (4) Accessing On-line Reports, and (5) Creating an HTML File and Setting Up an xTRS. In summary, Stage 4 of the NASAwide Electronic Publishing System is the final phase of its implementation through the prototyping and gradual integration of each NASA center's electronic printing systems, desktop publishing systems, and technical report servers to be able to provide to NASA's engineers, researchers, scientists, and external users the widest practicable and appropriate dissemination of information concerning its activities and the result thereof to their work stations.

  16. The System 80+ Standard Plant design control document. Volume 20

    International Nuclear Information System (INIS)

    1997-01-01

    This Design Control Document (DCD) is a repository of information comprising the System 80+trademark Standard Plant Design. The DCD also provides that design-related information to be incorporated by reference in the design certification rule for the System 80+ Standard Plant Design. Applicants for a combined license pursuant to 10 CFR 52 must ensure that the final Design Certification Rule and the associated Statements of Consideration are used when making all licensing decisions relevant to the System 80+ Standard Plant Design. The Design Control Document contains the DCD introduction, The Certified Design Material (CDM) [i.e., ''Tier 1''] and the Approved Design Material (ADM) [i.e., ''Tier 2''] for the System 80+ Standard Plant Design. The CDM includes the following sections: (1) Introductory material; (2) Certified Design Material for System 80+ systems and structures; (3) Certified Design Material for non-system-based aspects of the System 80+ Certified design; (4) Interface requirements; and (5) Site parameters. The ADM, to the extent applicable for the System 80+ Standard Plant Design, includes: (1) the information required for the final safety analysis report under 20 CFR 50.34; (2) other relevant information required by 10 CFR 52.47; and (3) emergency operations guidelines. This volume contains 2 technical specifications bases as part of Appendix 16 A Tech Spec Bases. They are TS B3.8 Electrical Power Technical Systems Bases and TS B3.9 Refueling Operations Bases. All 3 parts of section 17 (QA) and all 10 parts of section 18 (Human Factors) of the ADM Design and Analysis are contained in this volume. Topics covered in section 17 are: design phase QA; operations phase QA; and design phase reliability assurance. Topics covered by section 18 are: design team organization; design goals; design process; functional task analysis; control room configuration; information presentation; control and monitoring; verification and validation; and review documents

  17. System design document for the plutonium stabilization and packaging system

    International Nuclear Information System (INIS)

    1996-01-01

    The objective of this system is to stabilize and package plutonium metals and oxides of greater than 50% wt, as well as other selected isotopes, in accordance with the requirements for DOE standards for safe storage of these materials for 50 years. This document describes the highest level design information and user characteristics from an operational perspective. It provides guidance for developing procurement and installation specifications, interface requirements, and test plans

  18. System design document for the plutonium stabilization and packaging system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-08

    The objective of this system is to stabilize and package plutonium metals and oxides of greater than 50% wt, as well as other selected isotopes, in accordance with the requirements for DOE standards for safe storage of these materials for 50 years. This document describes the highest level design information and user characteristics from an operational perspective. It provides guidance for developing procurement and installation specifications, interface requirements, and test plans.

  19. Monitored Geologic Repository Project Description Document

    International Nuclear Information System (INIS)

    Curry, P. M.

    2001-01-01

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (YMP 2000a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6)

  20. Monitored Geologic Repository Project Description Document

    International Nuclear Information System (INIS)

    Curry, P.

    2000-01-01

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (CRWMS M and O 2000b) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) engineering design basis in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The engineering design basis documented in the PDD is to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the engineering design basis from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the engineering design basis captured in the SDDs and the design requirements captured in U.S. Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 2-1, the MGR Architecture (Section 4.1),the Engineering Design Bases (Section 5), and the Controlled Project Assumptions (Section 6)

  1. Using the Characteristics of Documents, Users and Tasks to Predict the Situational Relevance of Health Web Documents

    Directory of Open Access Journals (Sweden)

    Melinda Oroszlányová

    2017-09-01

    Full Text Available Relevance is usually estimated by search engines using document content, disregarding the user behind the search and the characteristics of the task. In this work, we look at relevance as framed in a situational context, calling it situational relevance, and analyze whether it is possible to predict it using documents, users and tasks characteristics. Using an existing dataset composed of health web documents, relevance judgments for information needs, user and task characteristics, we build a multivariate prediction model for situational relevance. Our model has an accuracy of 77.17%. Our findings provide insights into features that could improve the estimation of relevance by search engines, helping to conciliate the systemic and situational views of relevance. In a near future we will work on the automatic assessment of document, user and task characteristics.

  2. The changes in caregivers' perceptions about the quality of information and benefits of nursing documentation associated with the introduction of an electronic documentation system in a nursing home.

    Science.gov (United States)

    Munyisia, Esther N; Yu, Ping; Hailey, David

    2011-02-01

    To date few studies have compared nursing home caregivers' perceptions about the quality of information and benefits of nursing documentation in paper and electronic formats. With the increased interest in the use of information technology in nursing homes, it is important to obtain information on the benefits of newer approaches to nursing documentation so as to inform investment, organisational and care service decisions in the aged care sector. This study aims to investigate caregivers' perceptions about the quality of information and benefits of nursing documentation before and after the introduction of an electronic documentation system in a nursing home. A self-administered questionnaire survey was conducted three months before, and then six, 18 and 31 months after the introduction of an electronic documentation system. Further evidence was obtained through informal discussions with caregivers. Scores for questionnaire responses showed that the benefits of the electronic documentation system were perceived by the caregivers as provision of more accurate, legible and complete information, and reduction of repetition in data entry, with consequential managerial benefits. However, caregivers' perceptions of relevance and reliability of information, and of their communication and decision-making abilities were perceived to be similar either using an electronic or a paper-based documentation system. Improvement in some perceptions about the quality of information and benefits of nursing documentation was evident in the measurement conducted six months after the introduction of the electronic system, but were not maintained 18 or 31 months later. The electronic documentation system was perceived to perform better than the paper-based system in some aspects, with subsequent benefits to management of aged care services. In other areas, perceptions of additional benefits from the electronic documentation system were not maintained. In a number of attributes, there

  3. Quality Improvement Initiative on Pain Knowledge, Assessment, and Documentation Skills of Pediatric Nurses.

    Science.gov (United States)

    Margonary, Heather; Hannan, Margaret S; Schlenk, Elizabeth A

    2017-01-01

    Pain treatment begins with a nurse’s assessment, which relies on effective assessment skills. Hospital settings have implemented pain assessment education, but there is limited evidence in pediatric transitional care settings. The purpose of this quality improvement (QI) initiative was to develop, implement, and evaluate an evidence-based pain education session with 20 nurses in a pediatric specialty hospital that provides transitional care. Specific aims were to assess nurses’ knowledge and attitudes of pain, and evaluate assessment skills based on nurses’ documentation. A prospective pre-post design with three assessments (baseline, post-intervention, and one-month follow-up) was used. The Shriner’s Pediatric Nurses’ Knowledge and Attitudes Regarding Pain questionnaire and an electronic health record review were completed at each assessment. There was significant improvement in nurses’ knowledge and attitudes of pain after the education session (F[2,6] = 50.281, p nurses significantly increased from 43.1% at baseline to 64.8% at post-intervention, and 67.7% at follow-up (χ²[2] = 20.55, p Nursing interventions for pain increased significantly, from 33.3% at baseline to 84.0% at post-intervention, and stabilized at 80.0% at follow-up (χ²[2] = 8.91, p = 0.012). Frequency of pain reassessments did not show a statistically significant change, decreasing from 77.8% at baseline to 44.0% at post-intervention and 40.0% at follow-up (χ²[2]= 3.538, p = 0.171). Nurses’ pain knowledge and documentation of assessment skills were improved in this QI initiative.

  4. Operator-centered technical documentation of the power plant control system. Betreibergerechte, betriebstechnische Dokumentation der Kraftwerks-Leittechnik

    Energy Technology Data Exchange (ETDEWEB)

    Welfonder, E

    1986-01-01

    The report - starting with an overview of the general structure of documentation - includes in chapter 3 an assortment of the main expectations to be had by the technical staff towards control system documentation. These are divided into: general basic requirements; testable compulsory requirements; practical recommendations and information for the manufacturer. In chapter 4 these documentation requirements are reflected to the present state of technical documentation. The main emphasis of the report however is laid on the sample documentation for one control system area presented in chapter 5. This sample documentation is based on a hierarchically structured and function related documentary method developed by the University of Stuttgart on the basis of the derived requirements and the present usual control system documentation. This function-related documentary method proves to be useful, not only for the technical staff in his rapid search for control system disturbances, but also offers - due to its clear and homogeneous meshed structure - considerable advantages for control system planning, projecting and initial start ups. As the presented documentation method is furthermore independent of the control system manufacturers, it is important that all participants try to use it uniformly.

  5. Description and Documentation of the Dental School Dental Delivery System.

    Science.gov (United States)

    Chase, Rosen and Wallace, Inc., Alexandria, VA.

    A study was undertaken to describe and document the dental school dental delivery system using an integrated systems approach. In late 1976 and early 1977, a team of systems analysts and dental consultants visited three dental schools to observe the delivery of dental services and patient flow and to interview administrative staff and faculty.…

  6. The National Library of Kosovo "PJETER Bogdani" Rapid Condition Assessment and Documentation

    Science.gov (United States)

    Eppich, R.; Ramku, B.; Binakaj, N.

    2017-08-01

    The National Library of Kosovo "Pjetër Bogdani" is a symbol of Prishtina, Kosovo and the quest for knowledge. It is simultaneously an icon of modernity and symbol of the past. Unfortunately, it suffered through the Kosovo war and neglect in times of economic difficulty. It was also unfortunately featured in the British newspaper The Telegraph in their travel section: "One of the world's 30 ugliest buildings?" In late 2015 the Kosovo Architectural Foundation, a non-profit dedicated to spirit of creating and preserving unique architecture, became concerned with the reputation and condition of the Library and contacted the Kosovo Ministry of Culture, visited the site and initiated a project to raise awareness and document this modern masterpiece. The Getty Foundation and their Keeping it Modern grant program awarded funding for initial condition assessment, documentation, capacity building and investigations. This paper discusses the project to document and improve the image and awareness of this important structure and set priorities for its future.

  7. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    International Nuclear Information System (INIS)

    ROOT, R.W.

    1999-01-01

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems

  8. Comparison of Document Index Graph Using TextRank and HITS Weighting Method in Automatic Text Summarization

    Science.gov (United States)

    Hadyan, Fadhlil; Shaufiah; Arif Bijaksana, Moch.

    2017-01-01

    Automatic summarization is a system that can help someone to take the core information of a long text instantly. The system can help by summarizing text automatically. there’s Already many summarization systems that have been developed at this time but there are still many problems in those system. In this final task proposed summarization method using document index graph. This method utilizes the PageRank and HITS formula used to assess the web page, adapted to make an assessment of words in the sentences in a text document. The expected outcome of this final task is a system that can do summarization of a single document, by utilizing document index graph with TextRank and HITS to improve the quality of the summary results automatically.

  9. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  10. Model documentation of assessment and nursing diagnosis in the practice of nursing care management for nursing students

    OpenAIRE

    A. Aziz Alimul Hidayat; M. Kes

    2015-01-01

    Model documentation of assessment and nursing diagnosis in the practice of nursing care management is an integration model in nursing care records, especially records nursing assessment and diagnosis in one format. This model can reduce the duration of the recording in nursing care, and make it easier for students to understand the nursing diagnosis, so that nursing interventions more effective. The purpose of this paper was to describes the form integration documentation of nursing assessmen...

  11. Model documentation report: Industrial sector demand module of the National Energy Modeling System

    International Nuclear Information System (INIS)

    1997-01-01

    This report documents the objectives, analytical approach, and development of the National Energy Modeling System (NEMS) Industrial Demand Model. The report catalogues and describes model assumptions, computational methodology, parameter estimation techniques, and model source code. This document serves three purposes. First, it is a reference document providing a detailed description of the NEMS Industrial Model for model analysts, users, and the public. Second, this report meets the legal requirement of the Energy Information Administration (EIA) to provide adequate documentation in support of its models. Third, it facilitates continuity in model development by providing documentation from which energy analysts can undertake model enhancements, data updates, and parameter refinements as future projects. The NEMS Industrial Demand Model is a dynamic accounting model, bringing together the disparate industries and uses of energy in those industries, and putting them together in an understandable and cohesive framework. The Industrial Model generates mid-term (up to the year 2015) forecasts of industrial sector energy demand as a component of the NEMS integrated forecasting system. From the NEMS system, the Industrial Model receives fuel prices, employment data, and the value of industrial output. Based on the values of these variables, the Industrial Model passes back to the NEMS system estimates of consumption by fuel types

  12. Documenting pharmacist interventions on an intranet.

    Science.gov (United States)

    Simonian, Armen I

    2003-01-15

    The process of developing and implementing an intranet Web site for clinical intervention documentation is described. An inpatient pharmacy department initiated an organizationwide effort to improve documentation of interventions by pharmacists at its seven hospitals to achieve real-time capture of meaningful benchmarking data. Standardization of intervention types would allow the health system to contrast and compare medication use, process improvement, and patient care initiatives among its hospitals. After completing a needs assessment and reviewing current methodologies, a computerized tracking tool was developed in-house and integrated with the organization's intranet. Representatives from all hospitals agreed on content and functionality requirements for the Web site. The site was completed and activated in February 2002. Before this Web site was established, the most documented intervention types were Renal Adjustment and Clarify Dose, with a daily average of four and three, respectively. After site activation, daily averages for Renal Adjustment remained unchanged, but Clarify Dose is now documented nine times per day. Drug Information and i.v.-to-p.o. intervention types, which previously averaged less than one intervention per day, are now documented an average of four times daily. Approximately 91% of staff pharmacists are using this site. Future plans for this site include enhanced accessibility to the site with wireless personal digital assistants. The design and implementation of an intranet Web site to document pharmacists' interventions doubled the rate of intervention documentation and standardized the intervention types among hospitals in the health system.

  13. CANDU-9/480-SEU fuel handling system assessment document

    International Nuclear Information System (INIS)

    Hwang, Jeong Ki; Jo, C. H.; Kim, H. M.; Morikawa, D. T.

    1996-11-01

    This report summarize the rationale for the CANDU 9 fuel handling system, and the design choices recommended for components of the system. Some of the design requirements applicable to the CANDU 9 480-SEU fuel handling design choices are described. These requirements imposed by the CANDU 9 project. And the design features for the key components of fuel handling system, such as the fuelling machine, the carriage, the new fuel transfer system and the irradiated fuel transfer system, are described. The carriage seismic load evaluations relevant to the design are contained in the appendices. The majority of the carriage components are acceptable, or will likely be acceptable with some redesign. The concept for the CANDU 9 fuel handling system is based on proven CANDU designs, or on improved CANDU technology. Although some development work must be done, the fuel handling concept is judged to be feasible for the CANDU 9 480-SEU reactor. (author). 2 refs

  14. Holographic associative memories in document retrieval systems

    International Nuclear Information System (INIS)

    Becker, P.J.; Bolle, H.; Keller, A.; Kistner, W.; Riecke, W.D.; Wagner, U.

    1979-03-01

    The objective of this work was the implementation of a holographic memory with associative readout for a document retrieval system. Taking advantage of the favourable properties of holography - associative readout of the memory, parallel processing in the response store - may give shorter response times than sequentially organized data memories. Such a system may also operate in the interactive mode including chain associations. In order to avoid technological difficulties, the experimental setup made use of commercially available components only. As a result an improved holographic structure is proposed which uses volume holograms in photorefractive crystals as storage device. In two chapters of appendix we give a review of the state of the art of electrooptic devices for coherent optical data processing and of competing technologies (semiconductor associative memories and associative program systems). (orig.) [de

  15. Executive overview and introduction to the SMAP information system life-cycle and documentation standards

    Science.gov (United States)

    1989-01-01

    An overview of the five volume set of Information System Life-Cycle and Documentation Standards is provided with information on its use. The overview covers description, objectives, key definitions, structure and application of the standards, and document structure decisions. These standards were created to provide consistent NASA-wide structures for coordinating, controlling, and documenting the engineering of an information system (hardware, software, and operational procedures components) phase by phase.

  16. Assessment model validity document - HYDRASTAR. A stochastic continuum program for groundwater flow

    Energy Technology Data Exchange (ETDEWEB)

    Gylling, B. [Kemakta Konsult AB, Stockholm (Sweden); Eriksson, Lars [Equa Simulation AB, Sundbyberg (Sweden)

    2001-12-01

    HYDRASTAR and referenced here. In addition, the system of tools to present and inspect input and output data is shortly described in this document. HYDRASTAR is developed to produce probabilistic input to other models in the SKB model chain PROPER, which has been used in performance assessment studies conducted by SKB. As for most model concepts there are advantages and limitations for HYDRASTAR. However, one conclusion is that HYDRASTAR is valid for its purpose, i.e. local-scale stochastic groundwater modelling and advective transport for performance assessments under freshwater conditions.

  17. THE MANAGEMENT OF DOCUMENTS AN OPTIMISING COMPONENT FOR A COMPANIES IT SYSTEM

    Directory of Open Access Journals (Sweden)

    Vaduva Florin

    2008-05-01

    Full Text Available In order to ensure success in the competitive world of business, companies must accommodate the needs of their clients, partners, employees and capital owner. Companies that pay attention to the way their documents and information are administrated are more prepared to face cost reduction and can respond much faster to the changes occurred on Basically, it is all about information and controlling it and thus the response time is minimum to any inquiries or demands that come from inside the informational system of the company. So, you need an efficient document management. Software solutions that come to your aid, in order to optimize this process are Electronic Document Management System.

  18. Glass Formulation and Fabrication Laboratory, Building 864, Hazards assessment document

    Energy Technology Data Exchange (ETDEWEB)

    Banda, Z.; Wood, C.L.

    1995-08-01

    The Department of Energy Order 5500.3A requires facility-specific hazards assessments be prepared, maintained, and used for emergency planning purposes. This hazards assessment document describes the chemical and radiological hazards associated with the Glass Formulation and Fabrication Laboratory, Building 864. The entire inventory was screened according to the potential airborne impact to onsite and offsite individuals. The air dispersion model, ALOHA, estimated pollutant concentrations downwind from the source of a release, taking into consideration the toxicological and physical characteristics of the release site, the atmospheric conditions, and the circumstances of the release. The greatest distances at which a postulated facility event will produce consequences exceeding the ERPG-2 threshold is 96 meters. The highest emergency classification is a Site Area Emergency. The Emergency Planning Zone is 100 meters.

  19. Operating data documentation system for a research reactor

    International Nuclear Information System (INIS)

    Kasparec, F.; Hammer, J.

    1988-01-01

    The documentation system developed for the reactor to replace the automatic data logger is described in the paper. It is based on former experiences with the data logger which had led to a selection of representative data and useful data formats, but also made clear that the paper reports produced by the hardcopy terminal were not useful for further evaluation. A special pre-buffer hardware was provided to connect the data logger to the VAX. Because of its proven reliability an Epson-HX20 microcomputer was selected for this purpose. The documentation system hardware and the software are presented. The system has been operational for about ten months, collecting a daily average of 30kByte of data, and overcome a number of VAX system crashes, maintenance days and VAX/VMS updates. Various software extensions have been developed for processing the daily reports. Among these extensions there are programs for convenient tape backup, procedures for formatted printer output, and other. It is especially helpful to use commercial personal computer software for further data processing, in particular when PCs are connected in a network with the VAX or, on the other hand, emulate VAX terminals. There is a vast number of spread-sheet or database programs with excellent computational and graphic support available for PCs. Most of them allow data import, though format conversion programs will be necessary in most of the cases

  20. Documenting Matured Science: The BACC-Type Assessment Reports

    Science.gov (United States)

    Reckermann, M.; Omstedt, A. T.

    2016-12-01

    The BACC-type reports (BALTEX and Baltic Earth Assessment of Climate Change for the Baltic Sea region, BACC 2008 and BACC II 2015) represent an approach to assessing and making available current knowledge on regional climate change and its regional impacts on the physical, biogeochemical and biological environment (ecosystems, socio-economic sphere). The BACC assessments have originated in the BALTEX scientific research community (now Baltic Earth) and are coordinated by the International Baltic Earth Secretariat. The assessments are produced by teams of scientists from the region, led by lead authors who recruit experts from relevant topics to contribute. The report of 2015 was compiled by a different group of authors as 2008 to warrant independence of personal opinions and bias. The process is not externally funded and completely based on published scientific evidence, and not biased by political or economic interest groups. The BACC-type reports aim to bring together consolidated knowledge that has broad consensus in the scientific community, but also acknowledging issues for which contradicting opinions are found in the literature, so that no consensus can be reached ("consensus on dissensus"). An international steering committee is responsible for overlooking the process, and all manuscripts are anonymously peer-reviewed by independent international experts. Outreach to stakeholders and the public is an inherent aspect of this approach to document mature science. For the Baltic Sea, there is a close collaboration with HELCOM, the intergovernmental Baltic Marine Environment Protection Commission and the major regional science-policy interface in the Baltic Sea region. A summary for non-scientists was produced for the first BACC report and is in preparation for the second. Other BACC-type reports published are the climate report for the greater Hamburg area (published in 2011), and the NOSCCA report (North Sea Climate Change Assessment), published in 2016.

  1. Cultural diversity: blind spot in medical curriculum documents, a document analysis.

    Science.gov (United States)

    Paternotte, Emma; Fokkema, Joanne P I; van Loon, Karsten A; van Dulmen, Sandra; Scheele, Fedde

    2014-08-22

    Cultural diversity among patients presents specific challenges to physicians. Therefore, cultural diversity training is needed in medical education. In cases where strategic curriculum documents form the basis of medical training it is expected that the topic of cultural diversity is included in these documents, especially if these have been recently updated. The aim of this study was to assess the current formal status of cultural diversity training in the Netherlands, which is a multi-ethnic country with recently updated medical curriculum documents. In February and March 2013, a document analysis was performed of strategic curriculum documents for undergraduate and postgraduate medical education in the Netherlands. All text phrases that referred to cultural diversity were extracted from these documents. Subsequently, these phrases were sorted into objectives, training methods or evaluation tools to assess how they contributed to adequate curriculum design. Of a total of 52 documents, 33 documents contained phrases with information about cultural diversity training. Cultural diversity aspects were more prominently described in the curriculum documents for undergraduate education than in those for postgraduate education. The most specific information about cultural diversity was found in the blueprint for undergraduate medical education. In the postgraduate curriculum documents, attention to cultural diversity differed among specialties and was mainly superficial. Cultural diversity is an underrepresented topic in the Dutch documents that form the basis for actual medical training, although the documents have been updated recently. Attention to the topic is thus unwarranted. This situation does not fit the demand of a multi-ethnic society for doctors with cultural diversity competences. Multi-ethnic countries should be critical on the content of the bases for their medical educational curricula.

  2. User and Document Group Approach of Clustering in Tagging Systems

    DEFF Research Database (Denmark)

    Pan, Rong; Xu, Guandong; Dolog, Peter

    2010-01-01

    In this paper, we propose a spectral clustering approach for users and documents group modeling in order to capture the common preference and relatedness of users and documents, and to reduce the time complexity of similarity calculations. In experiments, we investigate the selection of the optim...... amount of clusters. We also show a reduction of the time consuming in calculating the similarity for the recommender systems by selecting a centroid first, and then compare the inside item on behalf of each group....

  3. Does teaching of documentation of shoulder dystocia delivery through simulation result in improved documentation in real life?

    Science.gov (United States)

    Comeau, Robyn; Craig, Catherine

    2014-03-01

    Documentation of deliveries complicated by shoulder dystocia is a valuable communication skill necessary for residents to attain during residency training. Our objective was to determine whether the teaching of documentation of shoulder dystocia in a simulation environment would translate to improved documentation of the event in an actual clinical situation. We conducted a cohort study involving obstetrics and gynaecology residents in years 2 to 5 between November 2010 and December 2012. Each resident participated in a shoulder dystocia simulation teaching session and was asked to write a delivery note immediately afterwards. They were given feedback regarding their performance of the delivery and their documentation of the events. Following this, dictated records of shoulder dystocia deliveries immediately before and after the simulation session were identified through the Meditech system. An itemized checklist was used to assess the quality of residents' dictated documentation before and after the simulation session. All eligible residents (18) enrolled in the study, and 17 met the inclusion criteria. For 10 residents (59%) documentation of a delivery with shoulder dystocia was present before and after the simulation session, for five residents (29%) it was only present before the session, and for two residents (18%) it was only present after the session. When residents were assessed as a group, there were no differences in the proportion of residents recording items on the checklist before and after the simulation session (P > 0.05 for all). Similarly, analysis of the performance of the10 residents who had dictated documentation both before and after the session showed no differences in the number of elements recorded on dictations done before and after the simulation session (P > 0.05 for all). The teaching of shoulder dystocia documentation through simulation did not result in a measurable improvement in the quality of documentation of shoulder dystocia in

  4. Design criteria document, electrical system, K-Basin essential systems recovery, Project W-405

    International Nuclear Information System (INIS)

    Hoyle, J.R.

    1994-01-01

    This Design Criteria Document provides the criteria for design and construction of electrical system modifications for 100K Area that are essential to protect the safe operation and storage of spent nuclear fuel in the K-Basin facilities

  5. Side effects of cancer therapies. International classification and documentation systems

    International Nuclear Information System (INIS)

    Seegenschmiedt, M.H.

    1998-01-01

    The publication presents and explains verified, international classification and documentation systems for side effects induced by cancer treatments, applicable in general and clinical practice and clinical research, and covers in a clearly arranged manner the whole range of treatments, including acute and chronic side effects of chemotherapy and radiotherapy, surgery, or combined therapies. The book fills a long-felt need in tumor documentation and is a major contribution to quality assurance in clinical oncology in German-speaking countries. As most parts of the book are bilingual, presenting German and English texts and terminology, it satisfies the principles of interdisciplinarity and internationality. The tabulated form chosen for presentation of classification systems and criteria facilitate the user's approach as well as application in daily work. (orig./CB) [de

  6. Establishment of ''Internal Rules'' and EDMS - Electronic Document Management System at NPP NEK

    International Nuclear Information System (INIS)

    Mandic, D.

    2012-01-01

    The main purpose of this paper is to present NPP's plans regarding the on-going project that started in November 2011, and that is related to the establishment of ''Internal Rules'' and EDMS - Electronic Document Management System.The term ''Internal Rules'' has been directly translated from Slovenian language (''Notranja pravila'') and adopted from the translated version of appropriate Slovenian national codes (ZVDAGA [1] in Slovenian language or PDAAIA [2] in English version). ''Internal Rules on capture and storage of materials in digital form'' refer to the rules adopted by a person as his/her internal act with reference to storage of his/her material. The main purpose for the establishment of the Internal Rules is to be able to justify that Krsko NPP is organized in compliance with the national codes covering that subject and strictly performing according to those Internal Rules. Once a Slovenian company achieves recognized and registered status in accordance with the Internal Rules document that has been certified and approved by the ARS (Archives of the Republic Slovenia), such company can utilize e-documents in the same way as they would utilize physical documents. Furthermore, a Slovenian company with approved Internal Rules can use e-documents in any legal aspect associated with the document's life cycle and the document's content as they would use the physical document or an authorized and approved copy of the physical document. Related to the nuclear regulatory background, NEK operates in compliance with the Slovenian legislation and also the US codes, regulations and guidelines; therefore, regarding the NPP specific documents, the Internal Rules and EDMS must also be in compliance with them. Since early 1990's, NEK has implemented document/records management system oriented towards supporting storage and management of physical documents/records and controlling distribution of active document copies. Document/records management system was supported by

  7. Model documentation report: Transportation sector model of the National Energy Modeling System

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This report documents the objectives, analytical approach and development of the National Energy Modeling System (NEMS) Transportation Model (TRAN). The report catalogues and describes the model assumptions, computational methodology, parameter estimation techniques, model source code, and forecast results generated by the model. This document serves three purposes. First, it is a reference document providing a detailed description of TRAN for model analysts, users, and the public. Second, this report meets the legal requirements of the Energy Information Administration (EIA) to provide adequate documentation in support of its statistical and forecast reports (Public Law 93-275, 57(b)(1)). Third, it permits continuity in model development by providing documentation from which energy analysts can undertake model enhancements, data updates, and parameter refinements.

  8. MANAGING HUMAN FACTORS IN IMPLEMENTING ELECTRONIC DOCUMENT SYSTEM IN THE PUBLIC SECTOR

    Directory of Open Access Journals (Sweden)

    TOMS LEIKUMS

    2012-05-01

    Full Text Available Document management underlies the activities of almost every organization. Correctly managed correspondence and organized document circulation characterize successful performance particularly in the public sector organizations. Even though production of documents itself is not the main task of governmental institutions, document creation and processing are crucial processes for the provision of basic functions in public sector. In the 21st century it gets more important to use the new possibilities offered by modern technologies, including electronic document management. Public sector itself is a heavy bureaucratic apparatus in the need of elasticity and ability to change its working processes and habits in order to gradually switch to the digital environment. Western European countries have already turned to electronic document management whilst most of the Eastern European countries, including Latvia, have just recently started a gradual electronization of document circulation. When implementing electronic document management systems in the public sector organizations, it often comes to resistance of the staff and unwillingness to change the accustomed methods of work – paper format document circulation. Both lower level staff and higher level managers put obstacles to electronic document management. In this article author inspects cases of successful practice and analyses possible action mechanisms that could convince public sector personnel of advantages of electronic document circulation and prepare them to switch to work with digital documents.

  9. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  10. A decision support system for the reading of ancient documents

    DEFF Research Database (Denmark)

    Roued-Cunliffe, Henriette

    2011-01-01

    The research presented in this thesis is based in the Humanities discipline of Ancient History and begins by attempting to understand the interpretation process involved in reading ancient documents and how this process can be aided by computer systems such as Decision Support Systems (DSS...... this process in the five areas: remembering complex reasoning, searching huge datasets, international collaboration, publishing editions, and image enhancement. This research contains a large practical element involving the development of a DSS prototype. The prototype is used to illustrate how a DSS......, by remembering complex reasoning, can aid the process of interpretation that is reading ancient documents. It is based on the idea that the interpretation process goes through a network of interpretation. The network of interpretation illustrates a recursive process where scholars move between reading levels...

  11. Informational system. Documents management

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2009-12-01

    Full Text Available Productivity growing, as well as reducing of operational costs in a company can be achieved by adopting a document management solutions. Such application will allow management and structured and efficient transmission of information within the organization.

  12. Communications data delivery system analysis : public workshop read-ahead document.

    Science.gov (United States)

    2012-04-09

    This document presents an overview of work conducted to date around development and analysis of communications data delivery systems for : supporting transactions in the connected vehicle environment. It presents the results of technical analysis of ...

  13. Risk-Informed Safety Assurance and Probabilistic Assessment of Mission-Critical Software-Intensive Systems

    Science.gov (United States)

    Guarro, Sergio B.

    2010-01-01

    This report validates and documents the detailed features and practical application of the framework for software intensive digital systems risk assessment and risk-informed safety assurance presented in the NASA PRA Procedures Guide for Managers and Practitioner. This framework, called herein the "Context-based Software Risk Model" (CSRM), enables the assessment of the contribution of software and software-intensive digital systems to overall system risk, in a manner which is entirely compatible and integrated with the format of a "standard" Probabilistic Risk Assessment (PRA), as currently documented and applied for NASA missions and applications. The CSRM also provides a risk-informed path and criteria for conducting organized and systematic digital system and software testing so that, within this risk-informed paradigm, the achievement of a quantitatively defined level of safety and mission success assurance may be targeted and demonstrated. The framework is based on the concept of context-dependent software risk scenarios and on the modeling of such scenarios via the use of traditional PRA techniques - i.e., event trees and fault trees - in combination with more advanced modeling devices such as the Dynamic Flowgraph Methodology (DFM) or other dynamic logic-modeling representations. The scenarios can be synthesized and quantified in a conditional logic and probabilistic formulation. The application of the CSRM method documented in this report refers to the MiniAERCam system designed and developed by the NASA Johnson Space Center.

  14. 242-A Control System device logic software documentation. Revision 2

    International Nuclear Information System (INIS)

    Berger, J.F.

    1995-01-01

    A Distributive Process Control system was purchased by Project B-534. This computer-based control system, called the Monitor and Control System (MCS), was installed in the 242-A Evaporator located in the 200 East Area. The purpose of the MCS is to monitor and control the Evaporator and Monitor a number of alarms and other signals from various Tank Farm facilities. Applications software for the MCS was developed by the Waste Treatment System Engineering Group of Westinghouse. This document describes the Device Logic for this system

  15. A Document-Based EHR System That Controls the Disclosure of Clinical Documents Using an Access Control List File Based on the HL7 CDA Header.

    Science.gov (United States)

    Takeda, Toshihiro; Ueda, Kanayo; Nakagawa, Akito; Manabe, Shirou; Okada, Katsuki; Mihara, Naoki; Matsumura, Yasushi

    2017-01-01

    Electronic health record (EHR) systems are necessary for the sharing of medical information between care delivery organizations (CDOs). We developed a document-based EHR system in which all of the PDF documents that are stored in our electronic medical record system can be disclosed to selected target CDOs. An access control list (ACL) file was designed based on the HL7 CDA header to manage the information that is disclosed.

  16. Elaboration of Safe Community Assessment System

    Directory of Open Access Journals (Sweden)

    Birutė Mikulskienė

    2013-08-01

    Full Text Available The paper aims to design an assessment system to monitor and evaluate safety parameters and administrative efforts with the purpose to increase safety in municipalities. The safety monitoring system considered is to be the most important tool for creation and development of safe communities in Lithuania. Several methods were applied to achieve this purpose. In order to determine the role of local government in ensuring the safety of people, property and environment at the local level of a meta-analysis of research reports, the Lithuanian national legislation, strategic planning documents of the state and local government were carried out. Analysis of statistical data, structural analysis, comparative analysis and synthesis methods were used while investigating the areas of safety uncertainty, risk groups, identifying safety risk factors, determining their relationship, and creating a safe community assessment system. A safe community assessment system, which consists of two types of criteria, has been elaborated. The assessment system is based on the multi-level criteria for safety monitoring and the multi-level criteria for the evaluation of municipal activities in the field of building safety. Links between the criteria, peculiarities of their application and advantages in the process of safe community creation and development are analyzed. Design and implementation of the safe community assessment system is one of the most important stages to implement the idea of safe communities. The proposed system integrates a variety of risk areas, the safety achievement criteria are linked to the criteria used in the strategic planning. Periodic assessment of the safety situation using the proposed system ensures possibility to monitor current local safety conditions and assess the changes and the trends. A safe community assessment system is proposed to be used as a tool to unified municipalities safety comprehensiveness and compare safety level in

  17. Elaboration of Safe Community Assessment System

    Directory of Open Access Journals (Sweden)

    Algirdas Astrauskas

    2011-12-01

    Full Text Available The paper aims to design an assessment system to monitor and evaluate safety parameters and administrative efforts with the purpose to increase safety in municipalities. The safety monitoring system considered is to be the most important tool for creation anddevelopment of safe communities in Lithuania. Several methods were applied to achieve this purpose. In order to determine the role of local government in ensuring the safety of people, property and environment at the local level of a meta-analysis of research reports,the Lithuanian national legislation, strategic planning documents of the state and local government were carried out. Analysis of statistical data, structural analysis, comparative analysis and synthesis methods were used while investigating the areas of safety uncertainty, risk groups, identifying safety risk factors, determining their relationship, and creating a safe community assessment system.A safe community assessment system, which consists of two types of criteria, has been elaborated. The assessment system is based on the multi-level criteria for safety monitoring and the multi-level criteria for the evaluation of municipal activities in the field of building safety. Links between the criteria, peculiarities of their application and advantages in the process of safe community creation and development are analyzed.Design and implementation of the safe community assessment system is one of the most important stages to implement the idea of safe communities. The proposed system integrates a variety of risk areas, the safety achievement criteria are linked to the criteria used in thestrategic planning. Periodic assessment of the safety situation using the proposed system ensures possibility to monitor current local safety conditions and assess the changes and the trends. A safe community assessment system is proposed to be used as a tool to unified municipalities safety comprehensiveness and compare safety level in

  18. Avionics Systems Laboratory/Building 16. Historical Documentation

    Science.gov (United States)

    Slovinac, Patricia; Deming, Joan

    2011-01-01

    As part of this nation-wide study, in September 2006, historical survey and evaluation of NASA-owned and managed facilities that was conducted by NASA s Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The results of this study are presented in a report entitled, "Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S. Space Shuttle Program, Lyndon B. Johnson Space Center, Houston, Texas," prepared in November 2007 by NASA JSC s contractor, Archaeological Consultants, Inc. As a result of this survey, the Avionics Systems Laboratory (Building 16) was determined eligible for listing in the NRHP, with concurrence by the Texas State Historic Preservation Officer (SHPO). The survey concluded that Building 5 is eligible for the NRHP under Criteria A and C in the context of the U.S. Space Shuttle program (1969-2010). Because it has achieved significance within the past 50 years, Criteria Consideration G applies. At the time of this documentation, Building 16 was still used to support the SSP as an engineering research facility, which is also sometimes used for astronaut training. This documentation package precedes any undertaking as defined by Section 106 of the NHPA, as amended, and implemented in 36 CFR Part 800, as NASA JSC has decided to proactively pursue efforts to mitigate the potential adverse affects of any future modifications to the facility. It includes a historical summary of the Space Shuttle program; the history of JSC in relation to the SSP; a narrative of the history of Building 16 and how it supported the SSP; and a physical description of the structure. In addition, photographs documenting the construction and historical use of Building 16 in support of the SSP, as well as photographs of the facility documenting the existing conditions, special technological features, and engineering details, are included. A contact sheet printed on archival paper, and an electronic copy of the work product on CD, are

  19. Total System Performance Assessment: Enhanced Design Alternative V

    International Nuclear Information System (INIS)

    N. Erb; S. Miller; V. Vallikat

    1999-01-01

    This calculation documents the total system performance assessment modeling of Enhanced Design Analysis (EDA) V. EDA V is based on the TSPA-VA base design which has been modified with higher thermal loading, a quartz sand invert, and line loading with 21 PWR waste packages that have 2-cm thick titanium grade 7 corrosion resistance material (CRM) drip shields placed over dual-layer waste packages composed of 'inside out' VA reference material (CRWMS M and O 1999a). This document details the changes and assumptions made to the VA reference Performance Assessment Model (CRWMS M and O 1998a) to incorporate the design changes detailed for EDA V. The performance measure for this evaluation is expected value dose-rate history. Time histories of dose rate are presented for EDA V and a Defense in Depth (DID) analysis base on EDA V. Additional details concerning the Enhanced Design Alternative II are provided in the 'LADS 3-12 Requests' interoffice correspondence (CRWMS M and O 1999a)

  20. Compilation of Quality Assurance Documentation for Analyses Performed for the Resumption of Transient Testing Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Schafer, Annette L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Sondrup, A. Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-11-01

    This is a companion document to the analyses performed in support of the environmental assessment for the Resumption of Transient Fuels and Materials Testing. It is provided to allow transparency of the supporting calculations. It provides computer code input and output. The basis for the calculations is documented separately in INL (2013) and is referenced, as appropriate. Spreadsheets used to manipulate the code output are not provided.

  1. Canadian hydrocarbon transportation system : transportation assessment

    International Nuclear Information System (INIS)

    2006-06-01

    This document provided an assessment of the Canadian hydrocarbon transportation system. In addition to regulating the construction and operation of Canada's 45,000 km of pipeline that cross international and provincial borders, Canada's National Energy Board (NEB) regulates the trade of natural gas, oil and natural gas liquids. The ability of pipelines to delivery this energy is critical to the country's economic prosperity. The pipeline system includes large-diameter, cross-country, high-pressure natural gas pipelines, low-pressure crude oil and oil products pipelines and small-diameter pipelines. In order to assess the hydrocarbon transportation system, staff at the NEB collected data from pipeline companies and a range of publicly available sources. The Board also held discussions with members of the investment community regarding capital markets and emerging issues. The assessment focused largely on evaluating whether Canadians benefit from an efficient energy infrastructure and markets. The safety and environmental integrity of the pipeline system was also evaluated. The current adequacy of pipeline capacity was assessed based on price differentials compared with firm service tolls for major transportation paths; capacity utilization on pipelines; and, the degree of apportionment on major oil pipelines. The NEB concluded that the Canadian hydrocarbon transportation system is working effectively, with an adequate capacity in place on existing natural gas pipelines, but with a tight capacity on oil pipelines. It was noted that shippers continue to indicate that they are reasonably satisfied with the services provided by pipeline companies and that the NEB-regulated pipeline companies are financially stable. 14 refs, 11 tabs., 28 figs., 4 appendices

  2. Joint Improvised-Threat Defeat Agency Needs to Improve Assessment and Documentation of Counter-Improvised Explosive Device Initiatives (Redacted)

    Science.gov (United States)

    2016-08-09

    E XC E L L E N C E Joint Improvised ‑Threat Defeat Agency Needs to Improve Assessment and Documentation of Counter‑ Improvised Explosive Device...USE ONLY DODIG-2016-120 (Project No. D2015-D000AE-0222.000) │ i Results in Brief Joint Improvised ‑Threat Defeat Agency Needs to Improve Assessment and...Documentation of Counter‑ Improvised Explosive Device Initiatives Visit us at www.dodig.mil Objective Our audit objective was to determine whether

  3. Document understanding for a broad class of documents

    NARCIS (Netherlands)

    Aiello, Marco; Monz, Christof; Todoran, Leon; Worring, Marcel

    2002-01-01

    We present a document analysis system able to assign logical labels and extract the reading order in a broad set of documents. All information sources, from geometric features and spatial relations to the textual features and content are employed in the analysis. To deal effectively with these

  4. IDC Re-Engineering Phase 2 System Requirements Document V1.3.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Burns, John F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Satpathi, Meara Allena [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-12-01

    This System Requirements Document (SRD) defines waveform data processing requirements for the International Data Centre (IDC) of the Comprehensive Nuclear Test Ban Treaty Organization (CTBTO). The IDC applies, on a routine basis, automatic processing methods and interactive analysis to raw International Monitoring System (IMS) data in order to produce, archive, and distribute standard IDC products on behalf of all States Parties. The routine processing includes characterization of events with the objective of screening out events considered to be consistent with natural phenomena or non-nuclear, man-made phenomena. This document does not address requirements concerning acquisition, processing and analysis of radionuclide data but includes requirements for the dissemination of radionuclide data and products.

  5. IDC Re-Engineering Phase 2 System Requirements Document Version 1.4

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Burns, John F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Satpathi, Meara Allena [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    This System Requirements Document (SRD) defines waveform data processing requirements for the International Data Centre (IDC) of the Comprehensive Nuclear Test Ban Treaty Organization (CTBTO). The IDC applies, on a routine basis, automatic processing methods and interactive analysis to raw International Monitoring System (IMS) data in order to produce, archive, and distribute standard IDC products on behalf of all States Parties. The routine processing includes characterization of events with the objective of screening out events considered to be consistent with natural phenomena or non-nuclear, man-made phenomena. This document does not address requirements concerning acquisition, processing and analysis of radionuclide data, but includes requirements for the dissemination of radionuclide data and products.

  6. 2008 HIMSS Survey results: best practices in implementing nursing/interdisciplinary documentation systems.

    Science.gov (United States)

    Newbold, Susan K; Kimmel, Kathleen C; O'Steen, Randy; Morgan, Gina Sauls

    2008-11-06

    Health care organizations are increasingly using computer systems to support nursing care documentation; however, processes used to deploy such systems are widely varied. The purpose of this survey was to understand current practices related to implementation of computerized nursing and interdisciplinary documentation systems with the goal to establish best practice guidelines. In Spring 2007, members from the Healthcare Information Management and Systems Society Nursing Informatics Working Group interviewed a sample of 15 hospitals to solicit information regarding the following processes: leadership activities, clinical transformation processes, project management activities, implementation processes, evaluation metrics, terminology and other standards used, and methods used to facilitate end-user adoption. This poster will report the results of this survey. Implications for Nurses will be discussed. The results are valuable to nursing informatics professionals who plan to implement systems and to their nursing executives responsible for the systems that are implemented.

  7. Communication Between Devices in the Viola Document Delivery System

    Directory of Open Access Journals (Sweden)

    Theodor Tolstoy

    2015-01-01

    Full Text Available Viola is a newly developed document delivery system that handles incoming and outgoing requests for printed books, articles, sharing electronic resources, and other document delivery services on the local level in a library organisation. An important part of Viola is the stack fetching Android application that enables librarians to collect books in the open and closed stacks in an efficient manner using a smartphone and a Bluetooth connected portable printer. The aim of this article is to show how information is transferred between systems and devices in Viola. The article presents code examples from Viola that use current .NET technologies. The examples span from the creation of high-level REST-based JSON APIs to byte array communication with a Bluetooth connected printer and the reading of RFID tags. Please note that code examples in this article are for illustration purposes only. Null checking and other exception handling has been removed for clarity. Code that is separated in Viola for testability and other reasons has been brought together to make it more readable.

  8. 78 FR 46783 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2013-08-01

    ..., Sequence 1] RIN 9000-AM09 Federal Acquisition Regulation; Documenting Contractor Performance AGENCY... the Contractor Performance Assessment Reporting System (CPARS), the single Governmentwide past... Procurement Policy (OFPP) memorandum entitled ``Improving the Use of Contractor Performance Information...

  9. The standard calibration instrument automation system for the atomic absorption spectrophotometer. Part 3: Program documentation

    Science.gov (United States)

    Ryan, D. P.; Roth, G. S.

    1982-04-01

    Complete documentation of the 15 programs and 11 data files of the EPA Atomic Absorption Instrument Automation System is presented. The system incorporates the following major features: (1) multipoint calibration using first, second, or third degree regression or linear interpolation, (2) timely quality control assessments for spiked samples, duplicates, laboratory control standards, reagent blanks, and instrument check standards, (3) reagent blank subtraction, and (4) plotting of calibration curves and raw data peaks. The programs of this system are written in Data General Extended BASIC, Revision 4.3, as enhanced for multi-user, real-time data acquisition. They run in a Data General Nova 840 minicomputer under the operating system RDOS, Revision 6.2. There is a functional description, a symbol definitions table, a functional flowchart, a program listing, and a symbol cross reference table for each program. The structure of every data file is also detailed.

  10. SYSTEM «PlagiarismControl» AS THE TOOL FOR THE EXPERTISE OF THE TEXT DOCUMENTS

    Directory of Open Access Journals (Sweden)

    Yu. B. Krapivin

    2018-01-01

    Full Text Available The description and the operability analysis of the implemented instrumental software system «PlagiarismControl» has been done. The system affords to automatize solving the task of the identification of the adopted fragments in the given text document both from the local full-text user’s database and from the Internet. The system affords solving the task taking in account explicit as well as implicit adoptions with precision up to lexical units paradigms and both lexical and grammatical synonymy relations, according to the structural-functional schematic diagram of the system of the automatic recognition of reproduced fragments of the text documents. «PlagiarismControl» is able to work in different modes, to automatize the work of the expert and to speed up significantly the procedure of the analysis of the documents, with the purpose of recognition of the adoptions (plagiarism from other text documents.

  11. The System 80+ Standard Plant design control document. Volume 1

    International Nuclear Information System (INIS)

    1997-01-01

    This Design Control Document (DCD) is a repository of information comprising the System 80+trademark Standard Plant Design. The DCD also provides that design-related information to be incorporated by reference in the design certification rule for the System 80+ Standard Plant Design. Applicants for a combined license pursuant to 10 CFR 52 must ensure that the final Design Certification Rule and the associated Statements of Consideration are used when making all licensing decisions relevant to the System 80+ Standard Plant Design. The Design Control Document contains the DCD introduction, The Certified Design Material (CDM) [i.e., ''Tier 1''] and the Approved Design Material (ADM) [i.e., ''Tier 2''] for the System 80+ Standard Plant Design. The CDM includes the following sections: (1) Introductory material; (2) Certified Design Material for System 80+ systems and structures; (3) Certified Design Material for non-system-based aspects of the System 80+ Certified design; (4) Interface requirements; and (5) Site parameters. The ADM, to the extent applicable for the System 80+ Standard Plant Design, includes: (1) the information required for the final safety analysis report under 20 CFR 50.34; (2) other relevant information required by 10 CFR 52.47; and (3) emergency operations guidelines. This volume covers the DCD introduction and contains sections 1 and parts 1--7 of section 2 of the CDM. Parts 1--7 included the following: (2.1) Design of SSC; (2.2) Reactor; (2.3) RCS and connected systems; (2.4) Engineered Safety Features; (2.5) Instrumentation and Control; (2.6) Electric Power; and (2.7) Auxiliary Systems

  12. The System 80+ Standard Plant design control document. Volume 19

    International Nuclear Information System (INIS)

    1997-01-01

    This Design Control Document (DCD) is a repository of information comprising the System 80+trademark Standard Plant Design. The DCD also provides that design-related information to be incorporated by reference in the design certification rule for the System 80+ Standard Plant Design. Applicants for a combined license pursuant to 10 CFR 52 must ensure that the final Design Certification Rule and the associated Statements of Consideration are used when making all licensing decisions relevant to the System 80+ Standard Plant Design. The Design Control Document contains the DCD introduction, The Certified Design Material (CDM) [i.e., ''Tier 1''] and the Approved Design Material (ADM) [i.e., ''Tier 2''] for the System 80+ Standard Plant Design. The CDM includes the following sections: (1) Introductory material; (2) Certified Design Material for System 80+ systems and structures; (3) Certified Design Material for non-system-based aspects of the System 80+ Certified design; (4) Interface requirements; and (5) Site parameters. The ADM, to the extent applicable for the System 80+ Standard Plant Design, includes: (1) the information required for the final safety analysis report under 20 CFR 50.34; (2) other relevant information required by 10 CFR 52.47; and (3) emergency operations guidelines. This volume contains five technical specification bases that are part of Appendix 16 A of the ADM Design and Analysis. They are: TS B3.3 Instrumentation Bases; TS B3.4 RCS Bases; TS B3.5 ECCS Bases; TS B3.6 Containment Systems Bases; and TS B3.7 Plant Systems Bases

  13. Principles for social impact assessment: A critical comparison between the international and US documents

    International Nuclear Information System (INIS)

    Vanclay, Frank

    2006-01-01

    The 'International Principles for Social Impact Assessment' and the 'Principles and Guidelines for Social Impact Assessment in the USA', both developed under the auspices of the International Association for Impact Assessment and published in 2003, are compared. Major differences in the definition and approach to social impact assessment (SIA) are identified. The US Principles and Guidelines is shown to be positivist/technocratic while the International Principles is identified as being democratic, participatory and constructivist. Deficiencies in both documents are identified. The field of SIA is changing to go beyond the prevention of negative impacts, to include issues of building social capital, capacity building, good governance, community engagement and social inclusion

  14. Television system for verification and documentation of treatment fields during intraoperative radiation therapy

    International Nuclear Information System (INIS)

    Fraass, B.A.; Harrington, F.S.; Kinsella, T.J.; Sindelar, W.F.

    1983-01-01

    Intraoperative radiation therapy (IORT) involves direct treatment of tumors or tumor beds with large single doses of radiation. The verification of the area to be treated before irradiation and the documentation of the treated area are critical for IORT, just as for other types of radiation therapy. A television system which allows the target area to be directly imaged immediately before irradiation has been developed. Verification and documentation of treatment fields has made the IORT television system indispensable

  15. The System 80+ Standard Plant design control document. Volume 11

    International Nuclear Information System (INIS)

    1997-01-01

    This Design Control Document (DCD) is a repository of information comprising the System 80+trademark Standard Plant Design. The DCD also provides that design-related information to be incorporated by reference in the design certification rule for the System 80+ Standard Plant Design. Applicants for a combined license pursuant to 10 CFR 52 must ensure that the final Design Certification Rule and the associated Statements of Consideration are used when making all licensing decisions relevant to the System 80+ Standard Plant Design. The Design Control Document contains the DCD introduction, The Certified Design Material (CDM) [i.e., ''Tier 1''] and the Approved Design Material (ADM) [i.e., ''Tier 2''] for the System 80+ Standard Plant Design. The CDM includes the following sections: (1) Introductory material; (2) Certified Design Material for System 80+ systems and structures; (3) Certified Design Material for non-system-based aspects of the System 80+ Certified design; (4) Interface requirements; and (5) Site parameters. The ADM, to the extent applicable for the System 80+ Standard Plant Design, includes: (1) the information required for the final safety analysis report under 20 CFR 50.34; (2) other relevant information required by 10 CFR 52.47; and (3) emergency operations guidelines. This volume covers parts 6 and 7 and appendix 7A for section 7 (Instrumentation and Control) of the ADM Design and Analysis. The topics covered by these are: other systems required for safety; control systems not required by safety; and CMF evaluation of limiting faults. Parts 1--3 of section 8 (Electric Power) of the ADM are also included in this volume. Topics covered by these parts are: introduction; offsite power system; and onsite power system

  16. The System 80+ Standard Plant design control document. Volume 10

    International Nuclear Information System (INIS)

    1997-01-01

    This Design Control Document (DCD) is a repository of information comprising the System 80+trademark Standard Plant Design. The DCD also provides that design-related information to be incorporated by reference in the design certification rule for the System 80+ Standard Plant Design. Applicants for a combined license pursuant to 10 CFR 52 must ensure that the final Design Certification Rule and the associated Statements of Consideration are used when making all licensing decisions relevant to the System 80+ Standard Plant Design. The Design Control Document contains the DCD introduction, The Certified Design Material (CDM) [i.e., ''Tier 1''] and the Approved Design Material (ADM) [i.e., ''Tier 2''] for the System 80+ Standard Plant Design. The CDM includes the following sections: (1) Introductory material; (2) Certified Design Material for System 80+ systems and structures; (3) Certified Design Material for non-system-based aspects of the System 80+ Certified design; (4) Interface requirements; and (5) Site parameters. The ADM, to the extent applicable for the System 80+ Standard Plant Design, includes: (1) the information required for the final safety analysis report under 20 CFR 50.34; (2) other relevant information required by 10 CFR 52.47; and (3) emergency operations guidelines. This volume contains Appendices 6A, 6B, and 6C for section 6 (Engineered Safety Features) of the ADM Design and Analysis. Also, parts 1--5 of section 7 (Instrumentation and Control) of the ADM Design and Analysis are covered. The following information is covered in these parts: introduction; reactor protection system; ESF actuation system; system required for safe shutdown; and safety-related display instrumentation

  17. The System 80+ Standard Plant design control document. Volume 2

    International Nuclear Information System (INIS)

    1997-01-01

    This Design Control Document (DCD) is a repository of information comprising the System 80+trademark Standard Plant Design. The DCD also provides that design-related information to be incorporated by reference in the design certification rule for the System 80+ Standard Plant Design. Applicants for a combined license pursuant to 10 CFR 52 must ensure that the final Design Certification Rule and the associated Statements of Consideration are used when making all licensing decisions relevant to the System 80+ Standard Plant Design. The Design Control Document contains the DCD introduction, The Certified Design Material (CDM) [i.e., ''Tier 1''] and the Approved Design Material (ADM) [i.e., ''Tier 2''] for the System 80+ Standard Plant Design. The CDM includes the following sections: (1) Introductory material; (2) Certified Design Material for System 80+ systems and structures; (3) Certified Design Material for non-system-based aspects of the System 80+ Certified design; (4) Interface requirements; and (5) Site parameters. The ADM, to the extent applicable for the System 80+ Standard Plant Design, includes: (1) the information required for the final safety analysis report under 20 CFR 50.34; (2) other relevant information required by 10 CFR 52.47; and (3) emergency operations guidelines. This volume covers the following information of the CDM: (2.8) Steam and power conversion; (2.9) Radioactive waste management; (2.10) Tech Support Center; (2.11) Initial test program; (2.12) Human factors; and sections 3, 4, and 5. Also covered in this volume are parts 1--6 of section 1 (General Plant Description) of the ADM Design and Analysis

  18. The System 80+ Standard Plant design control document. Volume 24

    International Nuclear Information System (INIS)

    1997-01-01

    This Design Control Document (DCD) is a repository of information comprising the System 80+trademark Standard Plant Design. The DCD also provides that design-related information to be incorporated by reference in the design certification rule for the System 80+ Standard Plant Design. Applicants for a combined license pursuant to 10 CFR 52 must ensure that the final Design Certification Rule and the associated Statements of Consideration are used when making all licensing decisions relevant to the System 80+ Standard Plant Design. The Design Control Document contains the DCD introduction, The Certified Design Material (CDM) [i.e., ''Tier 1''] and the Approved Design Material (ADM) [i.e., ''Tier 2''] for the System 80+ Standard Plant Design. The CDM includes the following sections: (1) Introductory material; (2) Certified Design Material for System 80+ systems and structures; (3) Certified Design Material for non-system-based aspects of the System 80+ Certified design; (4) Interface requirements; and (5) Site parameters. The ADM, to the extent applicable for the System 80+ Standard Plant Design, includes: (1) the information required for the final safety analysis report under 20 CFR 50.34; (2) other relevant information required by 10 CFR 52.47; and (3) emergency operations guidelines. This volume contains sections 7--11 of the ADM Emergency Operations Guidelines. Topics covered are: excess steam demand recovery; loss of all feedwater; loss of offsite power; station blackout recovery; and functional recovery guideline. Appendix A Severe Accident Management Guidelines and Appendix B Lower Mode Operational Guidelines are also included

  19. Health literacy, self-efficacy, and patients' assessment of medical disclosure and consent documentation.

    Science.gov (United States)

    Donovan-Kicken, Erin; Mackert, Michael; Guinn, Trey D; Tollison, Andrew C; Breckinridge, Barbara; Pont, Stephen J

    2012-01-01

    Informed consent documents are designed to convey the risks of medical procedures to patients, yet they are often difficult to understand; this is especially true for individuals with limited health literacy. An important opportunity for advancing knowledge about health literacy and informed consent involves examining the theoretical pathways that help to explain how health literacy relates to information processing when patients read consent forms. In this study, we proposed and tested a model that positioned self-efficacy as a mediator of the association between health literacy and patients' comprehension and assessment of informed consent documentation. Findings from structured interviews with patients (n = 254) indicated that lower health literacy predicted lower self-efficacy, which predicted feeling less well informed and less prepared, being more confused about the procedure and its hazards, and wanting more information about risks. Incorporating awareness of self-efficacy into disclosure documents and consent conversations may be a useful means of prompting patients to ask questions that can help them make informed decisions about care.

  20. The Multimedia Environmental Pollutant Assessment System (MEPAS)reg-sign: Source-term release formulations

    International Nuclear Information System (INIS)

    Streile, G.P.; Shields, K.D.; Stroh, J.L.; Bagaasen, L.M.; Whelan, G.; McDonald, J.P.; Droppo, J.G.; Buck, J.W.

    1996-11-01

    This report is one of a series of reports that document the mathematical models in the Multimedia Environmental Pollutant Assessment System (MEPAS). Developed by Pacific Northwest National Laboratory for the US Department of Energy, MEPAS is an integrated impact assessment software implementation of physics-based fate and transport models in air, soil, and water media. Outputs are estimates of exposures and health risk assessments for radioactive and hazardous pollutants. Each of the MEPAS formulation documents covers a major MEPAS component such as source-term, atmospheric, vadose zone/groundwater, surface water, and health exposure/health impact assessment. Other MEPAS documentation reports cover the sensitivity/uncertainty formulations and the database parameter constituent property estimation methods. The pollutant source-term release component is documented in this report. MEPAS simulates the release of contaminants from a source, transport through the air, groundwater, surface water, or overland pathways, and transfer through food chains and exposure pathways to the exposed individual or population. For human health impacts, risks are computed for carcinogens and hazard quotients for noncarcinogens. MEPAS is implemented on a desktop computer with a user-friendly interface that allows the user to define the problem, input the required data, and execute the appropriate models for both deterministic and probabilistic analyses

  1. Management plan documentation standard and Data Item Descriptions (DID). Volume of the information system life-cycle and documentation standards, volume 2

    Science.gov (United States)

    Callender, E. David; Steinbacher, Jody

    1989-01-01

    This is the second of five volumes of the Information System Life-Cycle and Documentation Standards. This volume provides a well-organized, easily used standard for management plans used in acquiring, assuring, and developing information systems and software, hardware, and operational procedures components, and related processes.

  2. Longitudinal analysis on utilization of medical document management system in a hospital with EPR implementation.

    Science.gov (United States)

    Kuwata, Shigeki; Yamada, Hitomi; Park, Keunsik

    2011-01-01

    Document management systems (DMS) have widespread in major hospitals in Japan as a platform to digitize the paper-based records being out of coverage by EPR. This study aimed to examine longitudinal trends of actual use of DMS in a hospital in which EPR had been in operation, which would be conducive to planning the further information management system in the hospital. Degrees of utilization of electronic documents and templates with DMS were analyzed based on data extracted from a university-affiliated hospital with EPR. As a result, it was found that the number of electronic documents as well as scanned documents circulating at the hospital tended to increase. The result indicated that replacement of paper-based documents with electronic documents did not occur. Therefore it was anticipated that the need for DMS would continue to increase in the hospital. The methods used this study to analyze the trend of DMS utilization would be applicable to other hospitals with with a variety of DMS implementation, such as electronic storage by scanning documents or paper preservation that is compatible with EPR.

  3. Discussion on the compilation of document of iso quality management system for radiation sterilization enterprises

    International Nuclear Information System (INIS)

    Li Chunhong; Ha Yiming; Zhou Hongjie; Feng Zhiguo; Wang Feng

    2006-01-01

    According to the character of cooperation of radiation sterilization, and association with request of ISO9001, ISO13485 and ISO11137, compilation of document in quality manual, procedure document and technological document during certification of ISO quality management system of cooperation of radiation sterilization was discussed. (authors)

  4. The System 80+ Standard Plant design control document. Volume 18

    International Nuclear Information System (INIS)

    1997-01-01

    This Design Control Document (DCD) is a repository of information comprising the System 80+trademark Standard Plant Design. The DCD also provides that design-related information to be incorporated by reference in the design certification rule for the System 80+ Standard Plant Design. Applicants for a combined license pursuant to 10 CFR 52 must ensure that the final Design Certification Rule and the associated Statements of Consideration are used when making all licensing decisions relevant to the System 80+ Standard Plant Design. The Design Control Document contains the DCD introduction, The Certified Design Material (CDM) [i.e., ''Tier 1''] and the Approved Design Material (ADM) [i.e., ''Tier 2''] for the System 80+ Standard Plant Design. The CDM includes the following sections: (1) Introductory material; (2) Certified Design Material for System 80+ systems and structures; (3) Certified Design Material for non-system-based aspects of the System 80+ Certified design; (4) Interface requirements; and (5) Site parameters. The ADM, to the extent applicable for the System 80+ Standard Plant Design, includes: (1) the information required for the final safety analysis report under 20 CFR 50.34; (2) other relevant information required by 10 CFR 52.47; and (3) emergency operations guidelines. This volume contains the following technical specifications of section 16 (Technical Specifications) of the ADM Design and Analysis: TS 3.3 Instrumentation; TS 3.4 Reactor Coolant System; TS 3.5 Emergency Core Cooling System; TS 3.6 Containment Systems; TS 3.7 Plant Systems; TS 3.8 Electrical Power Systems; TS 3.9 Refueling Operations; TS 4.0 Design Features; TS 5.0 Administrative Controls. Appendix 16 A Tech Spec Bases is also included. It contains the following: TS B2.0 Safety Limits Bases; TS B3.0 LCO Applicability Bases; TS B3.1 Reactivity Control Bases; TS B3.2 Power Distribution Bases

  5. Integrated management systems and workflow-based electronic document management: An empirical study

    Directory of Open Access Journals (Sweden)

    Hang Thu Pho

    2014-01-01

    Full Text Available Purpose: Many global organizations have aligned their strategy and operation via the ISO-based framework of integrated management system (IMS that allows them to merge quality, environment, health and safety management systems. In such context, having a robust electronic document management system (EDMS is essential, especially at global enterprises where a large amount of documents generated by processes flows through different work cultures. However, there is no "one-size-fits-all" design for EDMS because it depends on organizations' needs, size and resource allocation. This article discusses the interrelation between EDMS and IMS in order to suggest a best practice. Design/methodology/approach: This article methodologically based upon a qualitative, interpretivistic, longitudinal empirical study in a wind turbine factory. Findings and Originality/value: IMS improvement and effectiveness has been overlooking EDMS as a key factor in establishing appropriate technological support of the IMS processes. Rightful application of EDMS can further contribute to organizational learning, precision of documentation and cross-organisational collaboration. Research limitations/implications: Theorising on IMS needs a stronger perspective of the technological limitations and potentials of basing IMS on EDMS. Practical implications: IMS are complex systems involving a large number of administrative functions. EDMS provides a formal representation with automation potentials both heightening and securing document trustworthiness. Social implications: IMS has a tendency to stay with professionals, e.g. line managers and QA/QC/QMS professionals. The EDMS line of discussion suggests a broader inclusion. Originality/value: Researching IMS as a technological implementation is giving a better platform of aligning the IMS with other business processes and is bringing IMS closer to the operational activities within the enterprise.

  6. Guidance documents relating to landfills and contaminants

    Energy Technology Data Exchange (ETDEWEB)

    Schomaker, N.B.; Zunt, D.A.

    1990-01-01

    The Environmental Protection Agency is developing and updating a series of Technical Guidance Documents to provide best engineering control technology to meet the needs of the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response Compensation and Liability Act (CERCLA), respectively. These documents are the compilation of the research efforts to date relating to containment of pollutants from waste disposal to the land as relates to residuals management. The specific areas of research being conducted under the RCRA land disposal program relates to laboratory, pilot and field validation studies in cover systems, waste leaching and solidification, liner systems and disposal facility evaluation. The specific areas of research being conducted under the CERCLA uncontrolled waste sites (Superfund) program relate to in situ treatment, solidification/stabilization for treating hazardous waste, combustion technologies, best demonstrated available technology (BDAT), on-site treatment technologies, emerging biosystems, expert systems, personnel health protection equipment, and site and situation assessment. The Guidance Documents are intended to assist both the regulated community and the permitting authorities, as well as the Program Offices, and Regions, as well as the states and other interested parties, with the latest information relevant to waste management.

  7. Assessment of the Accounting and Joint Accounting/Computer Information Systems Programs.

    Science.gov (United States)

    Appiah, John; Cernigliaro, James; Davis, Jeffrey; Gordon, Millicent; Richards, Yves; Santamaria, Fernando; Siegel, Annette; Lytle, Namy; Wharton, Patrick

    This document presents City University of New York LaGuardia Community College's Department of Accounting and Managerial Studies assessment of its accounting and joint accounting/computer information systems programs report, and includes the following items: (1) description of the mission and goals of the Department of Accounting and Managerial…

  8. Automatic public access to documents and maps stored on and internal secure system.

    Science.gov (United States)

    Trench, James; Carter, Mary

    2013-04-01

    The Geological Survey of Ireland operates a Document Management System for providing documents and maps stored internally in high resolution and in a high level secure environment, to an external service where the documents are automatically presented in a lower resolution to members of the public. Security is devised through roles and Individual Users where role level and folder level can be set. The application is an electronic document/data management (EDM) system which has a Geographical Information System (GIS) component integrated to allow users to query an interactive map of Ireland for data that relates to a particular area of interest. The data stored in the database consists of Bedrock Field Sheets, Bedrock Notebooks, Bedrock Maps, Geophysical Surveys, Geotechnical Maps & Reports, Groundwater, GSI Publications, Marine, Mine Records, Mineral Localities, Open File, Quaternary and Unpublished Reports. The Konfig application Tool is both an internal and public facing application. It acts as a tool for high resolution data entry which are stored in a high resolution vault. The public facing application is a mirror of the internal application and differs only in that the application furnishes high resolution data into low resolution format which is stored in a low resolution vault thus, making the data web friendly to the end user for download.

  9. Model documentation report: Macroeconomic Activity Module (MAM) of the National Energy Modeling System

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    This report documents the objectives, analytical approach, and development of the National Energy Modeling System (NEMS) Macroeconomic Activity Module (MAM) used to develop the Annual Energy Outlook for 1997 (AEO 97). The report catalogues and describes the module assumptions, computations, methodology, parameter estimation techniques, and mainframe source code. This document serves three purposes. First it is a reference document providing a detailed description of the NEMS MAM used for the AEO 1997 production runs for model analysts, users, and the public. Second, this report meets the legal requirement of the Energy Information Administration (EIA) to provide adequate documentation in support of its models. Third, it facilitates continuity in model development by providing documentation from which energy analysts can undertake model enhancements, data updates, and parameter refinements as future projects.

  10. Independent Orbiter Assessment (IOA): Assessment of the backup flight system FMEA/CIL

    Science.gov (United States)

    Prust, E. E.; Ewell, J. J., Jr.; Hinsdale, L. W.

    1988-01-01

    The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA effort first completed an analysis of the Backup Flight System (BFS) hardware, generating draft failure modes and Potential Critical Items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The IOA results were then compared to the proposed NASA Post 51-L FMEA/CIL baseline. A resolution of each discrepancy from the comparison is provided through additional analysis as required. This report documents the results of that comparison for the Orbiter BFS hardware. The IOA product for the BFS analysis consisted of 29 failure mode worksheets that resulted in 21 Potential Critical Items (PCI) being identified. This product was originally compared with the proposed NASA BFS baseline and subsequently compared with the applicable Data Processing System (DPS), Electrical Power Distribution and Control (EPD and C), and Displays and Controls NASA CIL items. The comparisons determined if there were any results which had been found by the IOA but were not in the NASA baseline. The original assessment determined there were numerous failure modes and potential critical items in the IOA analysis that were not contained in the NASA BFS baseline. Conversely, the NASA baseline contained three FMEAs (IMU, ADTA, and Air Data Probe) for CIL items that were not identified in the IOA product.

  11. Nuclear computerized library for assessing reactor reliability (NUCLARR): User's guide: Part 3, NUCLARR system description

    International Nuclear Information System (INIS)

    Gilmore, W.E.; Gentillon, C.D.; Gertman, D.I.; Beers, G.H.; Galyean, W.J.; Gilbert, B.G.

    1988-06-01

    The Nuclear Computerized Library for Assessing Reactor Reliability (NUCLARR) is an automated data base management system for processing and storing human error probability and hardware component failure data. The NUCLARR system software resides on an IBM (or compatible) personal micro-computer. NUCLARR can be used by the end user to furnish data inputs for both human and hardware reliability analysis in support of a variety of risk assessment activities. The NUCLARR system is documented in a five-volume series of reports. Volume IV of this series is the User's Guide for operating the NUCLARR software and is presented in three parts. This document, Part 3: NUCLARR System Description, provides an in-depth discussion of the design characteristics and special features of the NUCLARR software. Part 3 also presents the organization of the data base structures and techniques used to manipulate the data

  12. [Efficiency of computer-based documentation in long-term care--preliminary project].

    Science.gov (United States)

    Lüngen, Markus; Gerber, Andreas; Rupprecht, Christoph; Lauterbach, Karl W

    2008-06-01

    In Germany the documentation of processes in long-term care is mainly paper-based. Planning, realization and evaluation are not supported in an optimal way. In a preliminary study we evaluated the consequences of the introduction of a computer-based documentation system using handheld devices. We interviewed 16 persons before and after introducing the computer-based documentation and assessed costs for the documentation process and administration. The results show that reducing costs is likely. The job satisfaction of the personnel increased, more time could be spent for caring for the residents. We suggest further research to reach conclusive results.

  13. Assessment model validity document. NAMMU: A program for calculating groundwater flow and transport through porous media

    International Nuclear Information System (INIS)

    Cliffe, K.A.; Morris, S.T.; Porter, J.D.

    1998-05-01

    NAMMU is a computer program for modelling groundwater flow and transport through porous media. This document provides an overview of the use of the program for geosphere modelling in performance assessment calculations and gives a detailed description of the program itself. The aim of the document is to give an indication of the grounds for having confidence in NAMMU as a performance assessment tool. In order to achieve this the following topics are discussed. The basic premises of the assessment approach and the purpose of and nature of the calculations that can be undertaken using NAMMU are outlined. The concepts of the validation of models and the considerations that can lead to increased confidence in models are described. The physical processes that can be modelled using NAMMU and the mathematical models and numerical techniques that are used to represent them are discussed in some detail. Finally, the grounds that would lead one to have confidence that NAMMU is fit for purpose are summarised

  14. Area 5 Radioactive Waste Management Site Safety Assessment Document

    International Nuclear Information System (INIS)

    Horton, K.K.; Kendall, E.W.; Brown, J.J.

    1980-02-01

    The Area 5 Radioactive Waste Management Safety Assessment Document evaluates site characteristics, facilities and operating practices which contribute to the safe handling and storage/disposal of radioactive wastes at the Nevada Test Site. Physical geography, cultural factors, climate and meteorology, geology, hydrology (with emphasis on radionuclide migration), ecology, natural phenomena, and natural resources are discussed and determined to be suitable for effective containment of radionuclides. Also considered, as a separate section, are facilities and operating practices such as monitoring; storage/disposal criteria; site maintenance, equipment, and support; transportation and waste handling; and others which are adequate for the safe handling and storage/disposal of radioactive wastes. In conclusion, the Area 5 Radioactive Waste Management Site is suitable for radioactive waste handling and storage/disposal for a maximum of twenty more years at the present rate of utilization

  15. San Juanico Hybrid System Technical and Institutional Assessment: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Corbus, D.; Newcomb, C.; Yewdall, Z.

    2004-07-01

    San Juanico is a fishing village of approximately 120 homes in the Municipality of Comondu, Baja California. In April, 1999, a hybrid power system was installed in San Juanico to provide 24-hour power, which was not previously available. Before the installation of the hybrid power system, a field study was conducted to characterize the electrical usage and institutional and social framework of San Juanico. One year after the installation of the hybrid power system a''post-electrification'' study was performed to document the changes that had occurred after the installation. In December of 2003, NREL visited the site to conduct a technical assessment of the system.

  16. Model documentation: Renewable Fuels Module of the National Energy Modeling System

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This report documents the objectives, analytical approach, and design of the National Energy Modeling System (NEMS) Renewable Fuels Module (RFM) as it related to the production of the 1994 Annual Energy Outlook (AEO94) forecasts. The report catalogues and describes modeling assumptions, computational methodologies, data inputs, and parameter estimation techniques. A number of offline analyses used in lieu of RFM modeling components are also described. This documentation report serves two purposes. First, it is a reference document for model analysts, model users, and the public interested in the construction and application of the RFM. Second, it meets the legal requirement of the Energy Information Administration (EIA) to provide adequate documentation in support of its models. The RFM consists of six analytical submodules that represent each of the major renewable energy resources -- wood, municipal solid waste (MSW), solar energy, wind energy, geothermal energy, and alcohol fuels. Of these six, four are documented in the following chapters: municipal solid waste, wind, solar and biofuels. Geothermal and wood are not currently working components of NEMS. The purpose of the RFM is to define the technological and cost characteristics of renewable energy technologies, and to pass these characteristics to other NEMS modules for the determination of mid-term forecasted renewable energy demand.

  17. Development and maintenance of product configuration systems: Requirements for a documentation tool

    DEFF Research Database (Denmark)

    Hvam, Lars; Christensen, Simon Pape; Jensen, Klaes Ladeby

    2005-01-01

    by letting a documentation tool handle trivial time consuming tasks (notification on change, consistency check etc.), as a computer often handles these tasks in a better way. Thus, a serious bottleneck in the maintenance of configuration systems can be eliminated by applying Information System (IS...

  18. System requirements and design description for the document basis database interface (DocBasis)

    International Nuclear Information System (INIS)

    Lehman, W.J.

    1997-01-01

    This document describes system requirements and the design description for the Document Basis Database Interface (DocBasis). The DocBasis application is used to manage procedures used within the tank farms. The application maintains information in a small database to track the document basis for a procedure, as well as the current version/modification level and the basis for the procedure. The basis for each procedure is substantiated by Administrative, Technical, Procedural, and Regulatory requirements. The DocBasis user interface was developed by Science Applications International Corporation (SAIC)

  19. Evacuation support system for improved medical documentation and information flow in the field.

    Science.gov (United States)

    Walderhaug, Ståle; Meland, Per Håkon; Mikalsen, Marius; Sagen, Terje; Brevik, John Ivar

    2008-02-01

    Documentation of medical treatment and observation of patients during evacuation from the point of injury to definitive treatment is important both for optimizing patient treatment and managing the evacuation process. The current practice in military medical field documentation uses paper forms and voice communication. There are many shortcomings associated with this approach, especially with respect to information capture and sharing processes. Current research addresses the use of new technology for civilian ambulance-to-hospital communication. The research work presented in this article addresses information capture and sharing in extreme military conditions by evaluating a targeted computerized information system called EvacSys during a military exercise in northern Norway in December 2003. EvacSys was designed and implemented in close cooperation with military medical personnel in both Norway and the USA. The system was evaluated and compared to the traditional paper-based documentation method during a military exercise. The on-site evaluation was conducted in a military medical platoon in the Norwegian Armed Forces, using questionnaires, semi-structured interviews, observation and video recording to capture the users' system acceptance. A prototype software system running on a commercial off-the-shelf hardware platform was successfully developed. The evaluation of this system shows that the usability of digital information capturing and sharing are perceived to be at least as good as the traditional paper-based method. The medics found the new digital method to be more viable than the old one. No technical problems were encountered. Our research shows that it is feasible to utilize digital information systems for medical documentation in extreme outdoor environments. The usability concern is of utmost importance, and more research should be put into the design and alignment with existing workflow. Successful digitalization of information at the point of care

  20. Tangible interactive system for document browsing and visualisation of multimedia data

    Science.gov (United States)

    Rytsar, Yuriy; Voloshynovskiy, Sviatoslav; Koval, Oleksiy; Deguillaume, Frederic; Topak, Emre; Startchik, Sergei; Pun, Thierry

    2006-01-01

    In this paper we introduce and develop a framework for document interactive navigation in multimodal databases. First, we analyze the main open issues of existing multimodal interfaces and then discuss two applications that include interaction with documents in several human environments, i.e., the so-called smart rooms. Second, we propose a system set-up dedicated to the efficient navigation in the printed documents. This set-up is based on the fusion of data from several modalities that include images and text. Both modalities can be used as cover data for hidden indexes using data-hiding technologies as well as source data for robust visual hashing. The particularities of the proposed robust visual hashing are described in the paper. Finally, we address two practical applications of smart rooms for tourism and education and demonstrate the advantages of the proposed solution.

  1. Computerized documentation systems for nuclear power plants: A vision for the future

    International Nuclear Information System (INIS)

    Jakobsson, S.; Tommila, T.

    1998-01-01

    Systematic management of different plant systems throughout their whole lifetime is a crucial ingredient in safe and economic operation of a nuclear power plant. Documentation is one of the key issues in this activity, both on a strategic and on an operational level. Present nuclear power plants were designed and built during the seventies and early eighties. At that time it was natural to base the plant documentation on paper. However, managing the large amount of information is a difficult task. Even a simple plant modification may introduce the need for a change in dozens of documents, and it is often very difficult to be sure that all changes have been done correctly. The rapid development of information technology has increased the number of modifications needed in plant computers and instrumentation and control systems. On the other hand, it has provided some means to tackle the information management problem. Computers are now used to produce also the simplest piece of paper, and records are often kept with an electronically readable master copy. Efficient utilisation of intelligent databases can provide valuable support to ensure a timely and correct modification of plant documentation. In all operating modes there would also be a benefit of an easy access to plant documentation, e.g. in the control room. This would be still enhanced if it can be presented in a way which is adapted to users' needs. The paper goes through some recent development trends in information technology with the intent to point to some of the most promising ideas. (author)

  2. Emergency Response Capability Baseline Needs Assessment Compliance Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Sharry, John A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-09-16

    This document is the second of a two-part analysis of Emergency Response Capabilities of Lawrence Livermore National Laboratory. The first part, 2013 Baseline Needs Assessment Requirements Document established the minimum performance criteria necessary to meet mandatory requirements. This second part analyses the performance of Lawrence Livermore Laboratory Emergency Management Department to the contents of the Requirements Document. The document was prepared based on an extensive review of information contained in the 2009 BNA, the 2012 BNA document, a review of Emergency Planning Hazards Assessments, a review of building construction, occupancy, fire protection features, dispatch records, LLNL alarm system records, fire department training records, and fire department policies and procedures.

  3. Cultural Heritage: An example of graphical documentation with automated photogrammetric systems

    Science.gov (United States)

    Giuliano, M. G.

    2014-06-01

    In the field of Cultural Heritage, the use of automated photogrammetric systems, based on Structure from Motion techniques (SfM), is widely used, in particular for the study and for the documentation of the ancient ruins. This work has been carried out during the PhD cycle that was produced the "Carta Archeologica del territorio intorno al monte Massico". The study suggests the archeological documentation of the mausoleum "Torre del Ballerino" placed in the south-west area of Falciano del Massico, along the Via Appia. The graphic documentation has been achieved by using photogrammetric system (Image Based Modeling) and by the classical survey with total station, Nikon Nivo C. The data acquisition was carried out through digital camera Canon EOS 5D Mark II with Canon EF 17-40 mm f/4L USM @ 20 mm with images snapped in RAW and corrected in Adobe Lightroom. During the data processing, the camera calibration and orientation was carried out by the software Agisoft Photoscans and the final result has allowed to achieve a scaled 3D model of the monument, imported in software MeshLab for the different view. Three orthophotos in jpg format were extracted by the model, and then were imported in AutoCAD obtaining façade's surveys.

  4. The System 80+ Standard Plant design control document. Volume 17

    International Nuclear Information System (INIS)

    1997-01-01

    This Design Control Document (DCD) is a repository of information comprising the System 80+trademark Standard Plant Design. The DCD also provides that design-related information to be incorporated by reference in the design certification rule for the System 80+ Standard Plant Design. Applicants for a combined license pursuant to 10 CFR 52 must ensure that the final Design Certification Rule and the associated Statements of Consideration are used when making all licensing decisions relevant to the System 80+ Standard Plant Design. The Design Control Document contains the DCD introduction, The Certified Design Material (CDM) [i.e., ''Tier 1''] and the Approved Design Material (ADM) [i.e., ''Tier 2''] for the System 80+ Standard Plant Design. The CDM includes the following sections: (1) Introductory material; (2) Certified Design Material for System 80+ systems and structures; (3) Certified Design Material for non-system-based aspects of the System 80+ Certified design; (4) Interface requirements; and (5) Site parameters. The ADM, to the extent applicable for the System 80+ Standard Plant Design, includes: (1) the information required for the final safety analysis report under 20 CFR 50.34; (2) other relevant information required by 10 CFR 52.47; and (3) emergency operations guidelines. This volume contains parts 2-7 and appendix 15A for section 15 (Accident Analysis) of the ADM Design and Analysis. Topics covered in these parts are: decrease in heat removal; decrease in RCS flow rate; power distribution anomalies; increase in RCS inventory; decrease in RCS inventory; release of radioactive materials. The appendix covers radiological release models. Also contained here are five technical specifications for section 16 (Technical Specifications) of the ADM Design and Analysis. They are: TS 1.0 Use and Applications; TS 2.0 Safety Limits; TS 3.0 LCO Availability; TS 3.1 Reactivity Control; and TS 3.2 Power Distribution

  5. Preliminary environmental assessment for the satellite power system (SPS)

    Energy Technology Data Exchange (ETDEWEB)

    1978-10-01

    A preliminary assessment of the impact of the Satellite Power System (SPS) on the environment is presented. Information that has appeared in documents referenced herein is integrated and assimilated. The state-of-knowledge as perceived from recently completed DOE-sponsored studies is disclosed, and prospective research and study programs that can advance the state-of-knowledge and provide an expanded data base for use in an assessment planned for 1980 are defined. Alternatives for research that may be implemented in order to achieve this advancement are also discussed in order that a plan can be selected which will be consistent with the fiscal and time constraints on the SPS Environmental Assessment Program. Health and ecological effects of microwave radiation, nonmicrowave effects on health and the environment (terrestrial operations and space operations), effects on the atmosphere, and effects on communications systems are examined in detail. (WHK)

  6. MONITORED GEOLOGIC REPOSITORY LIFE CYCLE COST ESTIMATE ASSUMPTIONS DOCUMENT

    International Nuclear Information System (INIS)

    R.E. Sweeney

    2001-01-01

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost (LCC) estimate and schedule update incorporating information from the Viability Assessment (VA) , License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance

  7. Monitored Geologic Repository Life Cycle Cost Estimate Assumptions Document

    International Nuclear Information System (INIS)

    Sweeney, R.

    2000-01-01

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost estimate and schedule update incorporating information from the Viability Assessment (VA), License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance

  8. Independent Orbiter Assessment (IOA): Assessment of the remote manipulator system FMEA/CIL

    Science.gov (United States)

    Tangorra, F.; Grasmeder, R. F.; Montgomery, A. D.

    1988-01-01

    The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA effort first completed an analysis of the Remote Manipulator System (RMS) hardware, generating draft failure modes and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The IOA results were than compared to the NASA FMEA/CIL baseline with proposed Post 51-L updates included. A resolution of each discrepancy from the comparison is provided through additional analysis as required. The results of that comparison for the Orbiter RMS hardware are documented. The IOA product for the RMS analysis consisted of 604 failure mode worksheets that resulted in 458 potential critical items being identified. Comparison was made to the NASA baseline which consisted of 45 FMEAs and 321 CIL items. This comparison produced agreement on all but 154 FMEAs which caused differences in 137 CIL items.

  9. NASAwide electronic publishing system-prototype STI electronic document distribution: Stage-4 evaluation report. Part 2; Appendices

    Science.gov (United States)

    Tuey, Richard C.; Collins, Mary; Caswell, Pamela; Haynes, Bob; Nelson, Michael L.; Holm, Jeanne; Buquo, Lynn; Tingle, Annette; Cooper, Bill; Stiltner, Roy

    1996-01-01

    This evaluation report contains an introduction, seven chapters, and five appendices. The Introduction describes the purpose, conceptual framework, functional description, and technical report server of the Scientific and Technical Information (STI) Electronic Document Distribution (EDD) project. Chapter 1 documents the results of the prototype STI EDD in actual operation. Chapter 2 documents each NASA center's post processing publication processes. Chapter 3 documents each center's STI software, hardware. and communications configurations. Chapter 7 documents STI EDD policy, practices, and procedures. The appendices consist of (A) the STI EDD Project Plan, (B) Team members, (C) Phasing Schedules, (D) Accessing On-line Reports, and (E) Creating an HTML File and Setting Up an xTRS. In summary, Stage 4 of the NASAwide Electronic Publishing System is the final phase of its implementation through the prototyping and gradual integration of each NASA center's electronic printing systems, desk top publishing systems, and technical report servers, to be able to provide to NASA's engineers, researchers, scientists, and external users, the widest practicable and appropriate dissemination of information concerning its activities and the result thereof to their work stations.

  10. About formation methodology for assessing the effectiveness of the use of information systems in the management

    Directory of Open Access Journals (Sweden)

    Lepetiukha Aleksandr Evgenevich

    2013-02-01

    Full Text Available A key element is the automation of electronic document management system. Result innovations in management can be achieved, if such a system would be effective. The authors have developed a system of indicators and assess the effectiveness of the procedure for forming an automated information system workflow.

  11. Integration of scanned document management with the anatomic pathology laboratory information system: analysis of benefits.

    Science.gov (United States)

    Schmidt, Rodney A; Simmons, Kim; Grimm, Erin E; Middlebrooks, Michael; Changchien, Rosy

    2006-11-01

    Electronic document management systems (EDMSs) have the potential to improve the efficiency of anatomic pathology laboratories. We implemented a novel but simple EDMS for scanned documents as part of our laboratory information system (AP-LIS) and collected cost-benefit data with the intention of discerning the value of such a system in general and whether integration with the AP-LIS is advantageous. We found that the direct financial benefits are modest but the indirect and intangible benefits are large. Benefits of time savings and access to data particularly accrued to pathologists and residents (3.8 h/d saved for 26 pathologists and residents). Integrating the scanned document management system (SDMS) into the AP-LIS has major advantages in terms of workflow and overall simplicity. This simple, integrated SDMS is an excellent value in a practice like ours, and many of the benefits likely apply in other practice settings.

  12. Timing and control monitor system upgrade design document. Version 4

    International Nuclear Information System (INIS)

    Brandt, J.J.

    1984-01-01

    This is a design document for the Timing and Control Monitor System Upgrade Project. This project is intended to provide a replacement system for the existing user Encoder Monitor Systems and Varian 72 Control Room computer systems. All of these systems reside at the Nevada Test Site. The function of the T and C Monitor System is to gather real-time statistics and data on user defined key variables from control, communication, data acquistion systems, and from the monitoring system itself. The control, communication, and data acquisition systems each operate separately from the monitor system. The T and C Monitor System gathers this data in order to verify the readiness of an event to begin countdown. This includes setup, verification, calibration, and peripheral services, report any failures that may occur during the countdown, verify detonation and containment, and assist reentry activities after the event

  13. TECHNICAL GUIDANCE DOCUMENT: CONSTRUCTION QUALITY MANAGEMENT FOR REMEDIAL ACTION AND REMEDIAL DESIGN WASTE CONTAINMENT SYSTEMS

    Science.gov (United States)

    This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. In ge...

  14. Overview of the Multimedia Environmental Pollutant Assessment System (MEPAS)

    International Nuclear Information System (INIS)

    Whelan, G.; Buck, J.W.; Strenge, D.L.; Droppo, J.G.; Hoopes, B.L.; Aiken, R.J.

    1992-01-01

    The Multimedia Environmental Pollutant Assessment System (MEPAS) is a physics-based risk computation code that integrates source-term, transport, and exposure models. Developed by Pacific Northwest Laboratory for screening and ranking of environmental problems, MEPAS is designed for site-specific assessments using readily available information to estimate potential health impacts. Risk values are computed for chemical and radioactive carcinogens; while hazard quotients, based on reference doses, are computed for noncarcinogens. This system has wide applicability to a range of environmental problems using air, groundwater, surface-water, overland, and exposure models. Whenever available and appropriate, EPA guidance and models were used to facilitate compatibility and acceptance. Although based on relatively standard transport and exposure computation approaches, the unique feature of MEPAS is that these approaches are integrated into a single system. The use of a single system provides a consistent basis for evaluating health impacts for a large number of problems and sites. Implemented on a desktop computer, a user-friendly shell allows the user to define the problem, input the required data, and execute the appropriate models. The MEPAS guidance documents include sources of information. MEPAS can be used for both screening and assessment applications for the remedial investigation/risk assessment/feasibility study and environment restoration processes

  15. System specification/system design document comment review: Plutonium Stabilization and Packaging System. Notes of conference

    International Nuclear Information System (INIS)

    1996-01-01

    A meeting was held between DOE personnel and the BNFL team to review the proposed resolutions to DOE comments on the initial issue of the system specification and system design document for the Plutonium Stabilization and Packaging System. The objectives of this project are to design, fabricate, install, and start up a glovebox system for the safe repackaging of plutonium oxide and metal, with a requirement of a 50-year storage period. The areas discussed at the meeting were: nitrogen in can; moisture instrumentation; glovebox atmosphere; can marking bar coding; weld quality; NFPA-101 references; inner can swabbing; ultimate storage environment; throughput; convenience can screw-top design; furnacetrays; authorization basis; compactor safety; schedule for DOE review actions; fire protection; criticality safety; applicable standards; approach to MC and A; homogeneous oxide; resistance welder power; and tray overfill. Revised resolutions were drafted and are presented

  16. Design requirements document for Project W-465, immobilized low-activity waste interim storage

    International Nuclear Information System (INIS)

    Burbank, D.A.

    1998-01-01

    The scope of this Design Requirements Document (DRD) is to identify the functions and associated requirements that must be performed to accept, transport, handle, and store immobilized low-activity waste (ILAW) produced by the privatized Tank Waste Remediation System (TWRS) treatment contractors. The functional and performance requirements in this document provide the basis for the conceptual design of the TWRS ILAW Interim Storage facility project and provides traceability from the program level requirements to the project design activity. Technical and programmatic risk associated with the TWRS planning basis are discussed in the Tank Waste Remediation System Decisions and Risk Assessment (Johnson 1994). The design requirements provided in this document will be augmented by additional detailed design data documented by the project

  17. An automated instrument for controlled-potential coulometry: System documentation

    Energy Technology Data Exchange (ETDEWEB)

    Holland, M K; Cordaro, J V

    1988-06-01

    An automated controlled-potential coulometer has been developed at the Savannah River Plant for the determination of plutonium. Two such coulometers have been assembled, evaluated, and applied. The software is based upon the methodology used at the Savannah River Plant, however the system is applicable with minimal software modifications to any of the methodologies used throughout the nuclear industry. These state-of-the-art coulometers feature electrical calibration of the integration system, background current corrections, and control-potential adjustment capabilities. Measurement precision within 0.1% has been demonstrated. The systems have also been successfully applied to the determination of pure neptunium solutions. The design and documentation of the automated instrument are described herein. Each individual module's operation, wiring layout, and alignment are described. Interconnection of the modules and system calibration are discussed. A complete set of system prints and a list of associated parts are included. 9 refs., 10 figs., 6 tabs.

  18. Detector Control System for an LHC experiment - User Requirements Document

    CERN Document Server

    CERN. Geneva

    1997-01-01

    The purpose of this document is to provide the user requirements for a detector control system kernel for the LHC experiments following the ESA standard PSS-05 [1]. The first issue will be used to provide the basis for an evaluation of possible development philosophies for a kernel DCS. As such it will cover all the major functionality but only to a level of detail sufficient for such an evaluation to be performed. Many of the requirements are therefore intentionally high level and generic, and are meant to outline the functionality that would be required of the kernel DCS, but not yet to the level of the detail required for implementation. The document is also written in a generic fashion in order not to rule out any implementation technology.

  19. Outpatients flow management and ophthalmic electronic medical records system in university hospital using Yahgee Document View.

    Science.gov (United States)

    Matsuo, Toshihiko; Gochi, Akira; Hirakawa, Tsuyoshi; Ito, Tadashi; Kohno, Yoshihisa

    2010-10-01

    General electronic medical records systems remain insufficient for ophthalmology outpatient clinics from the viewpoint of dealing with many ophthalmic examinations and images in a large number of patients. Filing systems for documents and images by Yahgee Document View (Yahgee, Inc.) were introduced on the platform of general electronic medical records system (Fujitsu, Inc.). Outpatients flow management system and electronic medical records system for ophthalmology were constructed. All images from ophthalmic appliances were transported to Yahgee Image by the MaxFile gateway system (P4 Medic, Inc.). The flow of outpatients going through examinations such as visual acuity testing were monitored by the list "Ophthalmology Outpatients List" by Yahgee Workflow in addition to the list "Patients Reception List" by Fujitsu. Patients' identification number was scanned with bar code readers attached to ophthalmic appliances. Dual monitors were placed in doctors' rooms to show Fujitsu Medical Records on the left-hand monitor and ophthalmic charts of Yahgee Document on the right-hand monitor. The data of manually-inputted visual acuity, automatically-exported autorefractometry and non-contact tonometry on a new template, MaxFile ED, were again automatically transported to designated boxes on ophthalmic charts of Yahgee Document. Images such as fundus photographs, fluorescein angiograms, optical coherence tomographic and ultrasound scans were viewed by Yahgee Image, and were copy-and-pasted to assigned boxes on the ophthalmic charts. Ordering such as appointments, drug prescription, fees and diagnoses input, central laboratory tests, surgical theater and ward room reservations were placed by functions of the Fujitsu electronic medical records system. The combination of the Fujitsu electronic medical records and Yahgee Document View systems enabled the University Hospital to examine the same number of outpatients as prior to the implementation of the computerized filing system.

  20. Study and development of a document file system with selective access

    International Nuclear Information System (INIS)

    Mathieu, Jean-Claude

    1974-01-01

    The objective of this research thesis was to design and to develop a set of software aimed at an efficient management of a document file system by using methods of selective access to information. Thus, the three main aspects of file processing (creation, modification, reorganisation) have been addressed. The author first presents the main problems related to the development of a comprehensive automatic documentation system, and their conventional solutions. Some future aspects, notably dealing with the development of peripheral computer technology, are also evoked. He presents the characteristics of INIS bibliographic records provided by the IAEA which have been used to create the files. In the second part, he briefly describes the file system general organisation. This system is based on the use of two main files: an inverse file which contains for each descriptor a list of of numbers of files indexed by this descriptor, and a dictionary of descriptor or input file which gives access to the inverse file. The organisation of these both files is then describes in a detailed way. Other related or associated files are created, and the overall architecture and mechanisms integrated into the file data input software are described, as well as various processing applied to these different files. Performance and possible development are finally discussed

  1. [Development of a medical equipment support information system based on PDF portable document].

    Science.gov (United States)

    Cheng, Jiangbo; Wang, Weidong

    2010-07-01

    According to the organizational structure and management system of the hospital medical engineering support, integrate medical engineering support workflow to ensure the medical engineering data effectively, accurately and comprehensively collected and kept in electronic archives. Analyse workflow of the medical, equipment support work and record all work processes by the portable electronic document. Using XML middleware technology and SQL Server database, complete process management, data calculation, submission, storage and other functions. The practical application shows that the medical equipment support information system optimizes the existing work process, standardized and digital, automatic and efficient orderly and controllable. The medical equipment support information system based on portable electronic document can effectively optimize and improve hospital medical engineering support work, improve performance, reduce costs, and provide full and accurate digital data

  2. Total System Performance Assessment for the Site Recommendation

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-10-02

    As mandated in the Nuclear Waste Policy Act of 1982, the U.S. Department of Energy (DOE) has been investigating a candidate site at Yucca Mountain, Nevada, to determine whether it is suitable for development of the nation's first repository for permanent geologic disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The Nuclear Waste Policy Amendments Act of 1987 directed that only Yucca Mountain be characterized to evaluate the site's suitability. Three main components of the DOE site characterization program are testing, design, and performance assessment. These program components consist of: Investigation of natural features and processes by analyzing data collected from field tests conducted above and below ground and from laboratory tests of rock, gas, and water samples Design of a repository and waste packages tailored to the site features, supported by laboratory testing of candidate materials for waste packages and design related testing in the underground tunnels where waste would be emplaced Quantitative estimates of the performance of the total repository system, over a range of possible conditions and for different repository configurations, by means of computer modeling techniques that are based on site and materials testing data and accepted principles of physics and chemistry. To date, DOE has completed and documented four major iterations of total system performance assessment (TSPA) for the Yucca Mountain site: TSPA-91 (Barnard et al. 1992), TSPA-93 (Wilson et al. 1994; CRWMS M and O 1994), TSPA-95 (CRWMS M and O 1995), and the Total System Performance Assessment-Viability Assessment (TSPA-VA) (DOE 1998a, Volume 3). Each successive TSPA iteration has advanced the technical understanding of the performance attributes of the natural features and processes and enhanced engineering designs. The next major iteration of TSPA is to be conducted in support of the next major programmatic milestone for the DOE, namely the

  3. The MPO system for automatic workflow documentation

    Energy Technology Data Exchange (ETDEWEB)

    Abla, G.; Coviello, E.N.; Flanagan, S.M. [General Atomics, P.O. Box 85608, San Diego, CA 92186-5608 (United States); Greenwald, M. [Massachusetts Institute of Technology, Cambridge, MA 02139 (United States); Lee, X. [General Atomics, P.O. Box 85608, San Diego, CA 92186-5608 (United States); Romosan, A. [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); Schissel, D.P., E-mail: schissel@fusion.gat.com [General Atomics, P.O. Box 85608, San Diego, CA 92186-5608 (United States); Shoshani, A. [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); Stillerman, J.; Wright, J. [Massachusetts Institute of Technology, Cambridge, MA 02139 (United States); Wu, K.J. [Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States)

    2016-11-15

    Highlights: • Data model, infrastructure, and tools for data tracking, cataloging, and integration. • Automatically document workflow and data provenance in the widest sense. • Fusion Science as test bed but the system’s framework and data model is quite general. - Abstract: Data from large-scale experiments and extreme-scale computing is expensive to produce and may be used for critical applications. However, it is not the mere existence of data that is important, but our ability to make use of it. Experience has shown that when metadata is better organized and more complete, the underlying data becomes more useful. Traditionally, capturing the steps of scientific workflows and metadata was the role of the lab notebook, but the digital era has resulted instead in the fragmentation of data, processing, and annotation. This paper presents the Metadata, Provenance, and Ontology (MPO) System, the software that can automate the documentation of scientific workflows and associated information. Based on recorded metadata, it provides explicit information about the relationships among the elements of workflows in notebook form augmented with directed acyclic graphs. A set of web-based graphical navigation tools and Application Programming Interface (API) have been created for searching and browsing, as well as programmatically accessing the workflows and data. We describe the MPO concepts and its software architecture. We also report the current status of the software as well as the initial deployment experience.

  4. The MPO system for automatic workflow documentation

    International Nuclear Information System (INIS)

    Abla, G.; Coviello, E.N.; Flanagan, S.M.; Greenwald, M.; Lee, X.; Romosan, A.; Schissel, D.P.; Shoshani, A.; Stillerman, J.; Wright, J.; Wu, K.J.

    2016-01-01

    Highlights: • Data model, infrastructure, and tools for data tracking, cataloging, and integration. • Automatically document workflow and data provenance in the widest sense. • Fusion Science as test bed but the system’s framework and data model is quite general. - Abstract: Data from large-scale experiments and extreme-scale computing is expensive to produce and may be used for critical applications. However, it is not the mere existence of data that is important, but our ability to make use of it. Experience has shown that when metadata is better organized and more complete, the underlying data becomes more useful. Traditionally, capturing the steps of scientific workflows and metadata was the role of the lab notebook, but the digital era has resulted instead in the fragmentation of data, processing, and annotation. This paper presents the Metadata, Provenance, and Ontology (MPO) System, the software that can automate the documentation of scientific workflows and associated information. Based on recorded metadata, it provides explicit information about the relationships among the elements of workflows in notebook form augmented with directed acyclic graphs. A set of web-based graphical navigation tools and Application Programming Interface (API) have been created for searching and browsing, as well as programmatically accessing the workflows and data. We describe the MPO concepts and its software architecture. We also report the current status of the software as well as the initial deployment experience.

  5. Extended Subject Access to Hypertext Online Documentation. Part III: The Document-Boundaries Problem.

    Science.gov (United States)

    Girill, T. R.

    1991-01-01

    This article continues the description of DFT (Document, Find, Theseus), an online documentation system that provides computer-managed on-demand printing of software manuals as well as the interactive retrieval of reference passages. Document boundaries in the hypertext database are discussed, search vocabulary complexities are described, and text…

  6. 1996 structural integrity assessments for the Category C Liquid Low-Level Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    This document provides a report of the efforts made to satisfy the Federal Facility Agreement for the structural integrity certification of ten Category C Liquid Low Level Waste (LLLW) tank systems on the Oak Ridge Reservation in Oak Ridge, Tennessee. Within this document, each Category C tank system is described including the associated pipeline segments evaluated as a part of those tank systems. A separate structural integrity assessment was conducted for each of the LLLW Tank Systems, four of which are located in Melton Valley, and six of which are located in Bethel Valley. The results of the structural integrity assessments are reported herein. The assessments are based on (1) a review of available tank design drawings, (2) a qualitative assessment of corrosion on the tank and pipelines, and primarily (3) leak testing program results

  7. 1996 structural integrity assessments for the Category C Liquid Low-Level Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    This document provides a report of the efforts made to satisfy the Federal Facility Agreement for the structural integrity certification of ten Category C Liquid Low Level Waste (LLLW) tank systems on the Oak Ridge Reservation in Oak Ridge, Tennessee. Within this document, each Category C tank system is described including the associated pipeline segments evaluated as a part of those tank systems. A separate structural integrity assessment was conducted for each of the LLLW Tank Systems, four of which are located in Melton Valley, and six of which are located in Bethel Valley. The results of the structural integrity assessments are reported herein. The assessments are based on (1) a review of available tank design drawings, (2) a qualitative assessment of corrosion on the tank and pipelines, and primarily (3) leak testing program results.

  8. Extended probabilistic system assessment calculations within the SKI project-90

    International Nuclear Information System (INIS)

    Pereira, A.

    1993-03-01

    The probabilistic system assessment calculation reported in the SKI Project-90 final documents were restricted to the following nuclides: 14 C, 129 I, 135 Cs, 237 Np and 240 Pu. In this report we have extended those calculations to another five nuclides: 79 Se, 243 Am, 240 Pu, 93 Zr and 99 Tc. The execution of probabilistic assessment calculations integrated in the context of SKIs first safety analysis exercise of an hypothetic final repository for high-level nuclear waste in Sweden, was a learning experience of relevance for the conduction of probabilistic safety assessment in future exercises. Some major conclusions and viewpoints of future need related with probabilistic assessment were withdrawn from this work and are presented in our report

  9. Analysis and classification of oncology activities on the way to workflow based single source documentation in clinical information systems.

    Science.gov (United States)

    Wagner, Stefan; Beckmann, Matthias W; Wullich, Bernd; Seggewies, Christof; Ries, Markus; Bürkle, Thomas; Prokosch, Hans-Ulrich

    2015-12-22

    Today, cancer documentation is still a tedious task involving many different information systems even within a single institution and it is rarely supported by appropriate documentation workflows. In a comprehensive 14 step analysis we compiled diagnostic and therapeutic pathways for 13 cancer entities using a mixed approach of document analysis, workflow analysis, expert interviews, workflow modelling and feedback loops. These pathways were stepwise classified and categorized to create a final set of grouped pathways and workflows including electronic documentation forms. A total of 73 workflows for the 13 entities based on 82 paper documentation forms additionally to computer based documentation systems were compiled in a 724 page document comprising 130 figures, 94 tables and 23 tumour classifications as well as 12 follow-up tables. Stepwise classification made it possible to derive grouped diagnostic and therapeutic pathways for the three major classes - solid entities with surgical therapy - solid entities with surgical and additional therapeutic activities and - non-solid entities. For these classes it was possible to deduct common documentation workflows to support workflow-guided single-source documentation. Clinical documentation activities within a Comprehensive Cancer Center can likely be realized in a set of three documentation workflows with conditional branching in a modern workflow supporting clinical information system.

  10. Development of Regulatory Documents for Creation (Upgrade) of Physical Protection Systems under the Russian/American MPC and A Program

    International Nuclear Information System (INIS)

    Izmaylov, Alexandr V.; Babkin, Vladimir; Kurov, Valeriy; Piskarev, Alexander; O'Brien, Patricia E.; Wright, Troy L.; Schlegel, Stephen C.; Hazel, Michael J.; Miller, Daniel R.; Tuttle, John D.; Kovchegin, Dmitry

    2009-01-01

    The development of new or the upgrade of existing physical protection systems (PPS) for nuclear facilities involves a multi-step and multidimensional process. The process consists of conceptual design, design, and commissioning stages. The activities associated with each of these stages are governed by Russian government and agency regulations. To ensure a uniform approach to development or upgrading of PPS at Russian nuclear facilities, the development of a range of regulatory and methodological documents is necessary. Some issues of PPS development are covered by the regulatory documents developed by Rosatom, as well as other Russian agencies with nuclear facilities under their control. This regulatory development has been accomplished as part of the U.S.-Russian MPC and A cooperation or independently by the Russian Federation. While regulatory coverage is extensive, there are a number of issues such as vulnerability analysis, effectiveness assessment, upgrading PPS, and protection of information systems for PPS that require additional regulations be developed. This paper reports on the status of regulatory coverage for PPS development or upgrade, and outlines a new approach to regulatory document development. It describes the evolutionary process of regulatory development through experience gained in the design, development and implementation of PPS as well as experience gained through the cooperative efforts of Russian and U.S. experts involved the development of MPC and A regulations.

  11. Customer Communication Document

    Science.gov (United States)

    2009-01-01

    This procedure communicates to the Customers of the Automation, Robotics and Simulation Division (AR&SD) Dynamics Systems Test Branch (DSTB) how to obtain services of the Six-Degrees-Of-Freedom Dynamic Test System (SDTS). The scope includes the major communication documents between the SDTS and its Customer. It established the initial communication and contact points as well as provides the initial documentation in electronic media for the customer. Contact the SDTS Manager (SM) for the names of numbers of the current contact points.

  12. Wildlife resource trends in the United States: A technical document supporting the 2000 RPA Assessment

    Science.gov (United States)

    Curtis H. Flather; Stephen J. Brady; Michael S. Knowles

    1999-01-01

    This report documents trends in wildlife resources for the nation as required by the Renewable Resources Planning Act (RPA) of 1974. The report focuses on recent historical trends in wildlife as one indicator of ecosystem health across the United States and updates wildlife trends presented in previous RPA Assessments. The report also shows short- and long-term...

  13. 33 CFR 96.250 - What documents and reports must a safety management system have?

    Science.gov (United States)

    2010-07-01

    ... safety management system have? 96.250 Section 96.250 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY VESSEL OPERATING REGULATIONS RULES FOR THE SAFE OPERATION OF VESSELS AND SAFETY MANAGEMENT SYSTEMS Company and Vessel Safety Management Systems § 96.250 What documents and...

  14. In situ analysis of historical documents through a portable system of X RF

    International Nuclear Information System (INIS)

    Ruvalcaba S, J.L.; Gonzalez T, C.

    2005-01-01

    From the analysis of the documents and ancient books, the chronology of documents, the use of materials (paper, parchment, inks, pigments) and deterioration, among others aspects may be determined. Usually it is difficult to bring the object to the laboratory for analysis and it is not possible to sample (even small portions). Due to the importance of the documents characterization, it is necessary to carry out a diagnostic analysis at the library in order to establish the general nature of the materials (organic or inorganic), the main composition of inks and pigments, actual and possible deterioration. From this point of view, X-ray fluorescence analysis (X RF) with a portable system, may be used for quick non-destructive elemental composition determinations. A X RF system was specially developed at the Physics Institute (UNAM) for these purposes and it may be used out of the laboratory in libraries and museums. In this work, our X RF methodology is described and the study of inks of manuscripts from 15 Th and 16 Th centuries belonging to the National Anthropology and History Library is presented. (Author)

  15. 48 CFR 1415.406 - Documentation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Documentation. 1415.406 Section 1415.406 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1415.406 Documentation. ...

  16. An ultraviolet-visible spectrophotometer automation system. Part 3: Program documentation

    Science.gov (United States)

    Roth, G. S.; Teuschler, J. M.; Budde, W. L.

    1982-07-01

    The Ultraviolet-Visible Spectrophotometer (UVVIS) automation system accomplishes 'on-line' spectrophotometric quality assurance determinations, report generations, plot generations and data reduction for chlorophyll or color analysis. This system also has the capability to process manually entered data for the analysis of chlorophyll or color. For each program of the UVVIS system, this document contains a program description, flowchart, variable dictionary, code listing, and symbol cross-reference table. Also included are descriptions of file structures and of routines common to all automated analyses. The programs are written in Data General extended BASIC, Revision 4.3, under the RDOS operating systems, Revision 6.2. The BASIC code has been enhanced for real-time data acquisition, which is accomplished by CALLS to assembly language subroutines. Two other related publications are 'An Ultraviolet-Visible Spectrophotometer Automation System - Part I Functional Specifications,' and 'An Ultraviolet-Visible Spectrophotometer Automation System - Part II User's Guide.'

  17. Brayton Isotope Power System. Phase I. (Ground demonstration system) Configuration Control Document (CCD)

    International Nuclear Information System (INIS)

    1976-01-01

    The configuration control document (CCD) defines the BIPS-GDS configuration. The GDS configuration is similar to a conceptual flight system design, referred to as the BIPS-FS, which is discussed in App. I. The BIPS is being developed by ERDA as a 500 to 2000 W(e), 7-y life, space power system utilizing a closed Brayton cycle gas turbine engine to convert thermal energy (from an isotope heat source) to electrical energy at a net efficiency exceeding 25 percent. The CCD relates to Phase I of an ERDA Program to qualify a dynamic system for launch in the early 1980's. Phase I is a 35-month effort to provide an FS conceptual design and GDS design, fabrication, and test. The baseline is a 7-year life, 450-pound, 4800 W(t), 1300 W(e) system which will use two multihundred watt (MHW) isotope heat sources being developed

  18. Technical Equivalency Documentation for a Newly Acquired Alpha Spectroscopy System

    International Nuclear Information System (INIS)

    Hickman, D P; Fisher, S K; Hann, P R; Hume, R

    2007-01-01

    The response of a recently acquired Canberra(trademark) Alpha Analyst 'Blue' system (Chamber Number's 173-208) used by the Hazards Control, Radiation Safety Section, WBC/Spectroscopy Team has been studied with respect to an existing Canberra system. The existing Canberra system consists of thirty Alpha Analyst dual chambers Model XXXX comprising a total of sixty detectors (Chambers Number's 101-124 and 137-172). The existing chambers were previously compared to an older system consisting of thirty-six Model 7401 alpha spectrometry chambers (Chamber Number's 1-36) Chambers 101-124 and 137-172 are DOELAP accredited. The older system was previously DOELAP accredited for the routine Alpha Spectroscopy program used in LLNL's in vitro bioassay program. The newly acquired Alpha Analyst system operates on a network with software that controls and performs analysis of the current Alpha Analyst system (Chamber Number's 101-124 and 137-172). This exact same software is used for the current system and the newly acquired system and is DOELAP accredited. This document compares results from the existing Alpha System with the newer Alpha Analyst system

  19. Waste Management System Requirements Document

    International Nuclear Information System (INIS)

    1992-02-01

    This DCP establishes an interim plan for the Office of Civilian Radioactive Waste Management (OCRWM) technical baseline until the results of the OCRWM Document Hierarchy Task Force can be implemented. This plan is needed to maintain continuity in the Program for ongoing work in the areas of Waste Acceptance, Transportation, Monitored Retrievable Storage (MRS) and Yucca Mountain Site Characterization

  20. Impact of an electronic health record operating room management system in ophthalmology on documentation time, surgical volume, and staffing.

    Science.gov (United States)

    Sanders, David S; Read-Brown, Sarah; Tu, Daniel C; Lambert, William E; Choi, Dongseok; Almario, Bella M; Yackel, Thomas R; Brown, Anna S; Chiang, Michael F

    2014-05-01

    Although electronic health record (EHR) systems have potential benefits, such as improved safety and quality of care, most ophthalmology practices in the United States have not adopted these systems. Concerns persist regarding potential negative impacts on clinical workflow. In particular, the impact of EHR operating room (OR) management systems on clinical efficiency in the ophthalmic surgery setting is unknown. To determine the impact of an EHR OR management system on intraoperative nursing documentation time, surgical volume, and staffing requirements. For documentation time and circulating nurses per procedure, a prospective cohort design was used between January 10, 2012, and January 10, 2013. For surgical volume and overall staffing requirements, a case series design was used between January 29, 2011, and January 28, 2013. This study involved ophthalmic OR nurses (n = 13) and surgeons (n = 25) at an academic medical center. Electronic health record OR management system implementation. (1) Documentation time (percentage of operating time documenting [POTD], absolute documentation time in minutes), (2) surgical volume (procedures/time), and (3) staffing requirements (full-time equivalents, circulating nurses/procedure). Outcomes were measured during a baseline period when paper documentation was used and during the early (first 3 months) and late (4-12 months) periods after EHR implementation. There was a worsening in total POTD in the early EHR period (83%) vs paper baseline (41%) (P system implementation was associated with worsening of intraoperative nursing documentation time especially in shorter procedures. However, it is possible to implement an EHR OR management system without serious negative impacts on surgical volume and staffing requirements.

  1. The significance of radiological control documentation in litigation

    International Nuclear Information System (INIS)

    Lodde, G.M.; Murphy, T.D.

    1988-01-01

    Commercial nuclear facilities accumulate radiological control program data and documents generated and retained pursuant to regulatory, license, and technical specification requirements. During and following the Three Mile Island Unit 2 (TMI-2) accident, many documents were produced that would not normally have been produced. Shortly after the accident, the US Nuclear Regulatory Commission (NRC) issued an order requiring the retention of all data, including documentary material and physical samples relating to the TMI-2 accident (44 Fed. Reg. 30788, May 29, 1979). Three years later, the NRC vacated the requirement to retain catalogued physical samples, provided the radioactivity data had been properly recorded, allowing disposal of many samples. After the TMI-2 accident, GPU Nuclear Corporation (GPU) designed and implemented an effective and efficient record management program for TMI. This Computer-Assisted Records and Information Retrieval System (CARIRS) was developed to assess the official record for TMI, which is maintained as a microform. GPU also retains hard copies of selected radiological control documents for potential litigation. This paper describes the use of radiological control documentation in the postaccident litigation and the magnitude of document production required to support that litigation

  2. From a Content Delivery Portal to a Knowledge Management System for Standardized Cancer Documentation.

    Science.gov (United States)

    Schlue, Danijela; Mate, Sebastian; Haier, Jörg; Kadioglu, Dennis; Prokosch, Hans-Ulrich; Breil, Bernhard

    2017-01-01

    Heterogeneous tumor documentation and its challenges of interpretation of medical terms lead to problems in analyses of data from clinical and epidemiological cancer registries. The objective of this project was to design, implement and improve a national content delivery portal for oncological terms. Data elements of existing handbooks and documentation sources were analyzed, combined and summarized by medical experts of different comprehensive cancer centers. Informatics experts created a generic data model based on an existing metadata repository. In order to establish a national knowledge management system for standardized cancer documentation, a prototypical tumor wiki was designed and implemented. Requirements engineering techniques were applied to optimize this platform. It is targeted to user groups such as documentation officers, physicians and patients. The linkage to other information sources like PubMed and MeSH was realized.

  3. Feature, Event, and Process Screening and Scenario Development for the Yucca Mountain Total System Performance Assessment

    International Nuclear Information System (INIS)

    Barnard, R.; Barr, G.; Burch, P.; Freeze, G.; Rechard, R.; Schenker, A.; Swift, P.

    1999-01-01

    Scenario development has two primary purposes in the design and documentation of post-closure performance assessments in a regulatory setting. First, scenario development ensures a sufficiently comprehensive consideration of the possible future states of the system. Second, scenario development identifies the important scenarios that must be considered in quantitative analyses of the total system performance assessment (TSPA). Section 2.0 of this report describes the scenario development process. Steps in the process are described in Section 2.1, and terms introduced in this section are defined in Section 2.2. The electronic database used to document the process is described in Section 3, and Section 4 provides a summary of the current status of the YMP scenario development work. Section 5 contains acknowledgments, and Section 6 contains a list of the references cited

  4. BoB, a best-of-breed automated text de-identification system for VHA clinical documents.

    Science.gov (United States)

    Ferrández, Oscar; South, Brett R; Shen, Shuying; Friedlin, F Jeffrey; Samore, Matthew H; Meystre, Stéphane M

    2013-01-01

    De-identification allows faster and more collaborative clinical research while protecting patient confidentiality. Clinical narrative de-identification is a tedious process that can be alleviated by automated natural language processing methods. The goal of this research is the development of an automated text de-identification system for Veterans Health Administration (VHA) clinical documents. We devised a novel stepwise hybrid approach designed to improve the current strategies used for text de-identification. The proposed system is based on a previous study on the best de-identification methods for VHA documents. This best-of-breed automated clinical text de-identification system (aka BoB) tackles the problem as two separate tasks: (1) maximize patient confidentiality by redacting as much protected health information (PHI) as possible; and (2) leave de-identified documents in a usable state preserving as much clinical information as possible. We evaluated BoB with a manually annotated corpus of a variety of VHA clinical notes, as well as with the 2006 i2b2 de-identification challenge corpus. We present evaluations at the instance- and token-level, with detailed results for BoB's main components. Moreover, an existing text de-identification system was also included in our evaluation. BoB's design efficiently takes advantage of the methods implemented in its pipeline, resulting in high sensitivity values (especially for sensitive PHI categories) and a limited number of false positives. Our system successfully addressed VHA clinical document de-identification, and its hybrid stepwise design demonstrates robustness and efficiency, prioritizing patient confidentiality while leaving most clinical information intact.

  5. Gstruct: a system for extracting schemas from GML documents

    Science.gov (United States)

    Chen, Hui; Zhu, Fubao; Guan, Jihong; Zhou, Shuigeng

    2008-10-01

    Geography Markup Language (GML) becomes the de facto standard for geographic information representation on the internet. GML schema provides a way to define the structure, content, and semantic of GML documents. It contains useful structural information of GML documents and plays an important role in storing, querying and analyzing GML data. However, GML schema is not mandatory, and it is common that a GML document contains no schema. In this paper, we present Gstruct, a tool for GML schema extraction. Gstruct finds the features in the input GML documents, identifies geometry datatypes as well as simple datatypes, then integrates all these features and eliminates improper components to output the optimal schema. Experiments demonstrate that Gstruct is effective in extracting semantically meaningful schemas from GML documents.

  6. Health effects assessment summary tables

    International Nuclear Information System (INIS)

    1999-01-01

    The document is an excellent pointer system to identify current literature or changes in assessment criteria for many chemicals of interest to Superfund. It was prepared for Superfund use by the Environmental Criteria and Assessment Office (ECAO-Cin) in EPA's Office of Health and Environmental Assessment. Chemicals considered are those for which Health Effects Assessment Documents, Health and Environmental Effects Profiles, Health Assessment Documents or Air Quality Criteria Documents have been prepared by ECAO. Radionuclides considered are those believed to be most common at Superfund sites. Tables summarize reference doses (RfDs) for toxicity from subchronic and chronic inhalation, oral exposure, slope factors and unit risk values for carcinogenicity based on lifetime inhalation and oral exposure, and radionuclide carcinogenicity

  7. Interface Control Document Between the Double Shell Tanks (DST) System and the Plutonium Finishing Plan (PFP)

    International Nuclear Information System (INIS)

    MAY, T.H.

    1999-01-01

    This document identifies the requirements and responsibilities for all parties to support waste transfer from the Plutonium Finishing Plant (PFP) facility to the Double-Shell Tank (DST) System of the River Protection Project (RPP). This Interface Control Document (ICD) will not attempt to control the physical portion of this interface because the physical equipment making up this interface, and any associated interface requirements, are already in place, operational and governed by existing operating specifications and other documentation. The PFP and DST Systems have a direct physical interface (the waste transfer pipeline) that travels between the 241-2 Building (TK-D5) and DST SY-102 via 244-TX double-contained receiver tank (DCRT). The purpose of the ICD process is to formalize working agreements between the RPP DST System and organization/companies internal and external to RPP. This ICD has been developed as part of the requirements basis for design of the DST System to support the Phase I Privatization effort

  8. Methodology and results of risk assessment of interconnections within the JET active gas handling system

    International Nuclear Information System (INIS)

    Ballantyne, P.R.; Bell, A.C.; Konstantellos, A.; Hemmerich, J.L.

    1992-01-01

    The Joint European Torus (JET) Active Gas Handling System (AGHS) is a complex interconnection of numerous subsystems. While individual subsystems were assessed for their risk of operation, an assessment of the effects of inadvertent interconnections was needed. A systematic method to document the assessment was devised to ease the assessment of complex plant and was applied to the AGHS. The methodology, application to AGHS, the four critical issues and required plant modifications as a result of this assessment are briefly discussed in this paper

  9. Instructions for submittal and control of FFTF design documents and design related documentation

    International Nuclear Information System (INIS)

    Grush, R.E.

    1976-10-01

    This document provides the system and requirements for management of FFTF technical data prepared by Westinghouse Hanford (HEDL), and design contractors, the construction contractor and lower tier equipment suppliers. Included in this document are provisions for the review, approval, release, change control, and accounting of FFTF design disclosure and base documentation. Also included are provisions for submittal of other design related documents for review and approval consistent with applicable requirements of RDT-Standard F 2-2, ''Quality Assurance Program Requirements.''

  10. Reliable planning and monitoring tools by dismantling 3D photographic image of high resolution and document management systems. Application MEDS system

    International Nuclear Information System (INIS)

    Vela Morales, F.

    2010-01-01

    MEDS system (Metric Environment Documentation System) is a method developed by CT3 based engineering documentation generation metric of a physical environment using measurement tools latest technology and high precision, such as the Laser Scanner. With this equipment it is possible to obtain three-dimensional information of a physical environment through the 3D coordinates of millions of points. This information is processed by software that is very useful tool for modeling operations and 3D simulations.

  11. A retrospective quality assessment of pre-hospital emergency medical documentation in motor vehicle accidents in south-eastern Norway

    Directory of Open Access Journals (Sweden)

    Staff Trine

    2011-03-01

    Full Text Available Abstract Background Few studies have evaluated pre-hospital documentation quality. We retrospectively assessed emergency medical service (EMS documentation of key logistic, physiologic, and mechanistic variables in motor vehicle accidents (MVAs. Methods Records from police, Emergency Medical Communication Centers (EMCC, ground and air ambulances were retrospectively collected for 189 MVAs involving 392 patients. Documentation of Glasgow Coma Scale (GCS, respiratory rate (RR, and systolic blood pressure (SBP was classified as exact values, RTS categories, clinical descriptions enabling post-hoc inference of RTS categories, or missing. The distribution of values of exact versus inferred RTS categories were compared (Chi-square test for trend. Results 25% of ground and 11% of air ambulance records were unretrieveable. Patient name, birth date, and transport destination was documented in >96% of ambulance records and 81% of EMCC reports. Only 54% of patient encounter times were transmitted to the EMCC, but 77% were documented in ground and 96% in air ambulance records. Ground ambulance records documented exact values of GCS in 48% and SBP in 53% of cases, exact RR in 10%, and RR RTS categories in 54%. Clinical descriptions made post-hoc inference of RTS categories possible in another 49% of cases for GCS, 26% for RR, and 20% for SBP. Air ambulance records documented exact values of GCS in 89% and SBP in 84% of cases, exact RR in 7% and RR RTS categories in 80%. Overall, for lower RTS categories of GCS, RR and SBP the proportion of actual documented values to inferred values increased (All: p Conclusion EMS documentation of logistic and mechanistic variables was adequate. Patient physiology was frequently documented only as descriptive text. Our finding indicates a need for improved procedures, training, and tools for EMS documentation. Documentation is in itself a quality criterion for appropriate care and is crucial to trauma research.

  12. The HAW project. Test storage of high-level radiation sources in the Asse salt mine. Documentation and assessment of the storage system

    International Nuclear Information System (INIS)

    Mueller, K.; Rothfuchs, T.

    1994-01-01

    The HAW project aimed primarily at studying the interaction between high-level radioactive waste moulds and rock salt as the respository medium. Another priority was the prototype development and testing of a technical system for the emplacement of high-level radioactive moulds in deep storage boreholes. To simulate real high-level radioactive wastes, special high-level radiation sources (Cs-137, Sr-90) were produced in the United States of America under a German-American cooperation contract, for carrying out the tests at the Asse salt mine. The components of the storage system are described, their position and task within the entire handling procedure explained. Questions of radiation protection and accident protection, of functioning and operating reliability, of quality assurance and examination of documents, materials, of manufacture and functioning, and of documentation are dealt with in detail. With a view to the planning of storage techniques for a mine respository, the experience of development and operation is recorded, and recommendation of further developments are given. Problems which arose during work on the HAW project were partly due to test-specific reasons and will not or not in this form occur in a mine respository. It was planned to start the test emplacement in 1987, and it could have been executed in 1993 after appropriate preparation and approval of the storage system by the mining authority and the Hanover TUEV in 1991. In December 1992, however, the Federal Government decided to give up to the project due to the uncertain licensing situation, and to immediately stop all preparatory work. (orig./HP) [de

  13. Design and implementation of an inpatient physician documentation system using off-the-shelf components.

    Science.gov (United States)

    Cucina, Russell J; Bokser, Seth J; Carter, Jonathan T; McLaren, Kevin M; Blum, Michael S

    2007-10-11

    We report the development and implementation of an electronic inpatient physician documentation system using off-the-shelf components, rapidly and at low cost. Within 9 months of deployment, over half of physician notes were electronic, and within 20 months, paper physician notes were eliminated. Our results suggest institutions can prioritize conversion to inpatient electronic physician documentation without waiting for development of sophisticated software packages or large capital investments.

  14. Documentation of the Oil and Gas Supply Module (OGSM). Appendix, Model developers report

    International Nuclear Information System (INIS)

    1995-01-01

    The Office of Integrated Analysis and Forecasting (OIAF) is required to provide complete model documentation to meet the EIA Model Acceptance Standards. The Documentation for the Oil and Gas Supply Module (OGSM) provides a complete description of the OGSM methodology, structure, and relation to other modules in the National Energy Modeling System (NEMS). This Model Developers Report (MDR) serves as an appendix to the methodology documentation. This report provides an overview of the model and an assessment of the sensitivity of OGSM results to changes in input data or parameters

  15. Large-Scale Multi-Dimensional Document Clustering on GPU Clusters

    Energy Technology Data Exchange (ETDEWEB)

    Cui, Xiaohui [ORNL; Mueller, Frank [North Carolina State University; Zhang, Yongpeng [ORNL; Potok, Thomas E [ORNL

    2010-01-01

    Document clustering plays an important role in data mining systems. Recently, a flocking-based document clustering algorithm has been proposed to solve the problem through simulation resembling the flocking behavior of birds in nature. This method is superior to other clustering algorithms, including k-means, in the sense that the outcome is not sensitive to the initial state. One limitation of this approach is that the algorithmic complexity is inherently quadratic in the number of documents. As a result, execution time becomes a bottleneck with large number of documents. In this paper, we assess the benefits of exploiting the computational power of Beowulf-like clusters equipped with contemporary Graphics Processing Units (GPUs) as a means to significantly reduce the runtime of flocking-based document clustering. Our framework scales up to over one million documents processed simultaneously in a sixteennode GPU cluster. Results are also compared to a four-node cluster with higher-end GPUs. On these clusters, we observe 30X-50X speedups, which demonstrates the potential of GPU clusters to efficiently solve massive data mining problems. Such speedups combined with the scalability potential and accelerator-based parallelization are unique in the domain of document-based data mining, to the best of our knowledge.

  16. Process of technical document quality assessment | Djebabra ...

    African Journals Online (AJOL)

    The most used instrument in training and scientific research is obviously the book which occupies since always a place of choice. Indeed, the book and more particularly the technical book are is used as a support, as well in the basic training as in the document is of good quality in order to have confidence in the services ...

  17. A route-specific system for risk assessment of radioactive materials transportation accidents

    International Nuclear Information System (INIS)

    Moore, J.E.; Sandquist, G.M.; Slaughter, D.M.

    1995-01-01

    A low-cost, powerful geographic information system (GIS) that operates on a personal computer was integrated into a software system to provide route specific assessment of the risks associated with the atmospheric release of radioactive and hazardous materials in transportation accidents. The highway transportation risk assessment (HITRA) software system described here combines a commercially available GIS (TransCAD) with appropriate models and data files for route- and accident-specific factors, such as meteorology, dispersion, demography, and health effects to permit detailed analysis of transportation risk assessment. The HITRA system allows a user to interactively select a highway or railroad route from a GIS database of major US transportation routes. A route-specific risk assessment is then performed to estimate downwind release concentrations and the resulting potential health effects imposed on the exposed population under local environmental and temporal conditions. The integration of GIS technology with current risk assessment methodology permits detailed analysis coupled with enhanced user interaction. Furthermore, HITRA provides flexibility and documentation for route planning, updating and improving the databases required for evaluating specific transportation routes, changing meteorological and environmental conditions, and local demographics

  18. Rancang Bangun Perpustakaan Digital Berbasis Document Management System pada Fakultas Ilmu Komputer UNSIKA

    Directory of Open Access Journals (Sweden)

    Yayan Gustiana

    2018-05-01

    Full Text Available A book is a reading tool for everyone, it is very important for an institution to keep knowledge going and generate new knowledge. In the library of the Faculty of Computer Science Unsika, one of the obstacles that is the library space where the books are less adequate and difficult to find the title of research for final students because the title should not be the same. Development of a library with Document Management System based is a method in solving the problem, it is expected to provide solutions in achieving a document management. Can accommodate all books uploaded by users, given permissions and speed in the deployment to all users. Development of this modeling tool using the method. Which is in accordance with the wishes of customers. Database storage using MySQL, Object Oriented Programming (OOP programming language using the Code Igniter (CI framework. Based on the results of simple random sampling of 35 respondents 86.80% say agree to the digital library. the concept of document management system required large storage media, server and good local connectivity. This function can also be a stepping stone to do research.

  19. A Study on the Quantitative Assessment Method of Software Requirement Documents Using Software Engineering Measures and Bayesian Belief Networks

    International Nuclear Information System (INIS)

    Eom, Heung Seop; Kang, Hyun Gook; Park, Ki Hong; Kwon, Kee Choon; Chang, Seung Cheol

    2005-01-01

    One of the major challenges in using the digital systems in a NPP is the reliability estimation of safety critical software embedded in the digital safety systems. Precise quantitative assessment of the reliability of safety critical software is nearly impossible, since many of the aspects to be considered are of qualitative nature and not directly measurable, but they have to be estimated for a practical use. Therefore an expert's judgment plays an important role in estimating the reliability of the software embedded in safety-critical systems in practice, because they can deal with all the diverse evidence relevant to the reliability and can perform an inference based on the evidence. But, in general, the experts' way of combining the diverse evidence and performing an inference is usually informal and qualitative, which is hard to discuss and will eventually lead to a debate about the conclusion. We have been carrying out research on a quantitative assessment of the reliability of safety critical software using Bayesian Belief Networks (BBN). BBN has been proven to be a useful modeling formalism because a user can represent a complex set of events and relationships in a fashion that can easily be interpreted by others. In the previous works we have assessed a software requirement specification of a reactor protection system by using our BBN-based assessment model. The BBN model mainly employed an expert's subjective probabilities as inputs. In the process of assessing the software requirement documents we found out that the BBN model was excessively dependent on experts' subjective judgments in a large part. Therefore, to overcome the weakness of our methodology we employed conventional software engineering measures into the BBN model as shown in this paper. The quantitative relationship between the conventional software measures and the reliability of software were not identified well in the past. Then recently there appeared a few researches on a ranking of

  20. Management control and status reports documentation standard and Data Item Descriptions (DID). Volume of the information system life-cycle and documentation standards, volume 5

    Science.gov (United States)

    Callender, E. David; Steinbacher, Jody

    1989-01-01

    This is the fifth of five volumes on Information System Life-Cycle and Documentation Standards. This volume provides a well organized, easily used standard for management control and status reports used in monitoring and controlling the management, development, and assurance of informations systems and software, hardware, and operational procedures components, and related processes.

  1. Assessment and Documentation Considerations for Postsecondary Students with Learning Disabilities

    Science.gov (United States)

    Lindstrom, Jennifer H.; Lindstrom, Will

    2011-01-01

    In order to gain access to accommodations and services at colleges and universities, students with learning disabilities must provide documentation of their disabilities, and as students with learning disabilities access higher education at increasing rates, the need for documentation of their disabilities and its impact becomes even more…

  2. 76 FR 20366 - Changes to the Public Housing Assessment System (PHAS): Management Operations Scoring Notice

    Science.gov (United States)

    2011-04-12

    ... Housing Assessment System (PHAS): Management Operations Scoring Notice AGENCY: Office of the Assistant... Management Operations interim scoring notice. The document inadvertently omitted a word with respect to the... INFORMATION: I. Background The proposed management operations scoring information was published on August 21...

  3. Development of electronic document management system for scientific and technical design administration automation (evidence from European Organization for Nuclear Research)

    International Nuclear Information System (INIS)

    Titov, R.N.

    2011-01-01

    The new principles and methods of electronic document management system construction are developed. The software package for electronic document handling is made, it provides automation of work flow management and permits to trace and correct on-line the flow of documents. The formal models of electronic documents describing complex hierarchic structures of data with the use of XML-trees are considered. On the base of investigations conducted the CERN electronic document management system has been upgraded, it allowed to shorten more than twofold the time for automation of new business processes [ru

  4. Stress analysis of piping systems and piping supports. Documentation

    International Nuclear Information System (INIS)

    Rusitschka, Erwin

    1999-01-01

    The presentation is focused on the Computer Aided Tools and Methods used by Siemens/KWU in the engineering activities for Nuclear Power Plant Design and Service. In the multi-disciplinary environment, KWU has developed specific tools to support As-Built Documentation as well as Service Activities. A special application based on Close Range Photogrammetry (PHOCAS) has been developed to support revamp planning even in a high level radiation environment. It comprises three completely inter-compatible expansion modules - Photo Catalog, Photo Database and 3D-Model - to generate objects which offer progressively more utilization and analysis options. To support the outage planning of NPP/CAD-based tools have been developed. The presentation gives also an overview of the broad range of skills and references in: Plant Layout and Design using 3D-CAD-Tools; evaluation of Earthquake Safety (Seismic Screening); Revamps in Existing Plants; Inter-disciplinary coordination of project engineering and execution fields; Consulting and Assistance; Conceptual Studies; Stress Analysis of Piping Systems and Piping Supports; Documentation; Training and Supports in CAD-Design, etc. All activities are performed to the greatest extent possible using proven data-processing tools. (author)

  5. Model documentation Renewable Fuels Module of the National Energy Modeling System

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This report documents the objectives, analaytical approach and design of the National Energy Modeling System (NEMS) Renewable Fuels Module (RFM) as it relates to the production of the 1996 Annual Energy Outlook forecasts. The report catalogues and describes modeling assumptions, computational methodologies, data inputs, and parameter estimation techniques. A number of offline analyses used in lieu of RFM modeling components are also described.

  6. Model documentation Coal Market Module of the National Energy Modeling System

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-30

    This report documents objectives and conceptual and methodological approach used in the development of the National Energy Modeling System (NEMS) Coal Market Module (CMM) used to develop the Annual Energy Outlook 1996 (AEO96). This report catalogues and describes the assumptions, methodology, estimation techniques, and source code of CMM`s three submodules: Coal Production Submodule, Coal Export Submodule, and Coal Distribution Submodule.

  7. Independent Orbiter Assessment (IOA): Assessment of the EPD and C/remote manipulator system FMEA/CIL

    Science.gov (United States)

    Robinson, W. W.

    1988-01-01

    The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA effort first completed an analysis of the Electrical Power Distribution and Control (EPD and C)/Remote Manipulator System (RMS) hardware, generating draft failure modes and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The IOA analysis of the EPD and C/RMS hardware initially generated 345 failure mode worksheets and identified 117 Potential Critical Items (PCIs) before starting the assessment process. These analysis results were compared to the proposed NASA Post 51-L baseline of 132 FMEAs and 66 CIL items.

  8. Assessment of the Plutonium Finishing Plant Criticality Alarm System U.S. Department of Energy Richland Operations Office

    International Nuclear Information System (INIS)

    NIRIDER, L.T.

    2002-01-01

    At the request of the Assistant Manager for Safety and Engineering, the U.S. Department of Energy Richland Operations Office (RL) Engineering Support Division, performed an oversight review of the Plutonium Finishing Plant (PFP) nuclear Criticality Alarm System (CAS). The review was conducted to satisfy requirements and agreements associated with Defense Nuclear Facility Safety Board (DNFSB) Recommendation 2000-2, ''Vital Safety Systems.'' The PFP is managed by Fluor Hanford, Inc. for RL. The field assessment and staff interviews were conducted August 12 through August 19,2002. This was a limited scope assessment that consisted of a review of the nuclear CAS operations, maintenance, and compliance with National Consensus Standards Requirements. The main purpose of the assessment was to determine the adequacy of the existing alarm system and its associated infrastructure to support the PFP facility mission through the remaining facility lifetime. The Review Plan was modeled upon Criteria and Review Approach Documents (CRAD) developed for DNFSB Recommendation 2000-2 reviews conducted across the Hanford Site. Concerns regarding component degradation and failure, increasing numbers of occurrence reports associated with the alarm system, and reliability issues were addressed. Additionally, RL performed a review of the engineering aspects of the CAS including the functions of design authorities and aspects of systems engineering. However, the focus of the assessment was on operations, maintenance, and reliability of the CAS, associated procurement practices, adequacy of safety and engineering policies and procedures, safety documentation, and fundamental engineering practices including training, qualification, and systems engineering. This assessment revealed that the PFP CAS and its associated infrastructure, administrative procedures, and conduct of operations are generally effective. There are no imminent criticality safety issues associated with the operation of the

  9. Supplemental mathematical formulations, Atmospheric pathway: The Multimedia Environmental Pollutant Assessment System (MEPAS)

    International Nuclear Information System (INIS)

    Droppo, J.G.; Buck, J.W.

    1996-03-01

    The Multimedia Environmental Pollutant Assessment System (MEPAS) is an integrated software implementation of physics-based fate and transport models for health and environmental risk assessments of both radioactive and hazardous pollutants. This atmospheric component report is one of a series of formulation reports that document the MEPAS mathematical models. MEPAS is a ''multimedia'' model; pollutant transport is modeled within, through, and between multiple media (air, soil, groundwater, and surface water). The estimated concentrations in the various media are used to compute exposures and impacts to the environment, to maximum individuals, and to populations

  10. Documentation package for the RFID temperature monitoring system (Model 9977 packages at NTS)

    International Nuclear Information System (INIS)

    Chen, K.; Tsai, H.

    2009-01-01

    The technical basis for extending the Model 9977 shipping package periodic maintenance beyond the one-year interval to a maximum of five years is based on the performance of the O-ring seals and the environmental conditions. The DOE Packaging Certification Program (PCP) has tasked Argonne National Laboratory to develop a Radio-Frequency Identification (RFID) temperature monitoring system for use by the facility personnel at DAF/NTS. The RFID temperature monitoring system, depicted in the figure below, consists of the Mk-1 RFId tags, a reader, and a control computer mounted on a mobile platform that can operate as a stand-alone system, or it can be connected to the local IT network. As part of the Conditions of Approval of the CoC, the user must complete the prescribed training to become qualified and be certified for operation of the RFID temperature monitoring system. The training course will be administered by Argonne National Laboratory on behalf of the Headquarters Certifying Official. This is a complete documentation package for the RFID temperature monitoring system of the Model 9977 packagings at NTS. The documentation package will be used for training and certification. The table of contents are: Acceptance Testing Procedure of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Acceptance Testing Result of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Performance Test of the Single Bolt Seal Sensor for the Model 9977 Packaging; Calibration of Built-in Thermistors in RFID Tags for Nevada Test Site; Results of Calibration of Built-in Thermistors in RFID Tags; Results of Thermal Calibration of Second Batch of MK-I RFID Tags; Procedure for Installing and Removing MK-1 RFID Tag on Model 9977 Drum; User Guide for RFID Reader and Software for Temperature Monitoring of Model 9977 Drums at NTS; Software Quality Assurance Plan (SQAP) for the ARG-US System; Quality Category for the RFID Temperature Monitoring System; The

  11. Using an educational electronic documentation system to help nursing students accurately identify patient data.

    Science.gov (United States)

    Pobocik, Tamara

    2015-01-01

    This quantitative research study used a pretest/posttest design and reviewed how an educational electronic documentation system helped nursing students to identify the accurate "related to" statement of the nursing diagnosis for the patient in the case study. Students in the sample population were senior nursing students in a bachelor of science nursing program in the northeastern United States. Two distinct groups were used for a control and intervention group. The intervention group used the educational electronic documentation system for three class assignments. Both groups were given a pretest and posttest case study. The Accuracy Tool was used to score the students' responses to the related to statement of a nursing diagnosis given at the end of the case study. The scores of the Accuracy Tool were analyzed, and then the numeric scores were placed in SPSS, and the paired t test scores were analyzed for statistical significance. The intervention group's scores were statistically different from the pretest scores to posttest scores, while the control group's scores remained the same from pretest to posttest. The recommendation to nursing education is to use the educational electronic documentation system as a teaching pedagogy to help nursing students prepare for nursing practice. © 2014 NANDA International, Inc.

  12. Preliminary environmental assessment for the Satellite Power System (SPS). Revision 1. Volume 2. Detailed assessment

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    The Department of Energy (DOE) is considering several options for generating electrical power to meet future energy needs. The satellite power system (SPS), one of these options, would collect solar energy through a system of satellites in space and transfer this energy to earth. A reference system has been described that would convert the energy to microwaves and transmit the microwave energy via directive antennas to large receiving/rectifying antennas (rectennas) located on the earth. At the rectennas, the microwave energy would be converted into electricity. The potential environmental impacts of constructing and operating the satellite power system are being assessed as a part of the Department of Energy's SPS Concept Development and Evaluation Program. This report is Revision I of the Preliminary Environmental Assessment for the Satellite Power System published in October 1978. It refines and extends the 1978 assessment and provides a basis for a 1980 revision that will guide and support DOE recommendations regarding future SPS development. This is Volume 2 of two volumes. It contains the technical detail suitable for peer review and integrates information appearing in documents referenced herein. The key environmental issues associated with the SPS concern human health and safety, ecosystems, climate, and electromagnetic systems interactions. In order to address these issues in an organized manner, five tasks are reported: (I) microwave-radiation health and ecological effects; (II) nonmicrowave health and ecological effectss; (III) atmospheric effects; (IV) effects on communication systems due to ionospheric disturbance; and (V) electromagnetic compatibility. (WHK)

  13. GCtool for fuel cell systems design and analysis : user documentation.

    Energy Technology Data Exchange (ETDEWEB)

    Ahluwalia, R.K.; Geyer, H.K.

    1999-01-15

    GCtool is a comprehensive system design and analysis tool for fuel cell and other power systems. A user can analyze any configuration of component modules and flows under steady-state or dynamic conditions. Component models can be arbitrarily complex in modeling sophistication and new models can be added easily by the user. GCtool also treats arbitrary system constraints over part or all of the system, including the specification of nonlinear objective functions to be minimized subject to nonlinear, equality or inequality constraints. This document describes the essential features of the interpreted language and the window-based GCtool environment. The system components incorporated into GCtool include a gas flow mixer, splitier, heater, compressor, gas turbine, heat exchanger, pump, pipe, diffuser, nozzle, steam drum, feed water heater, combustor, chemical reactor, condenser, fuel cells (proton exchange membrane, solid oxide, phosphoric acid, and molten carbonate), shaft, generator, motor, and methanol steam reformer. Several examples of system analysis at various levels of complexity are presented. Also given are instructions for generating two- and three-dimensional plots of data and the details of interfacing new models to GCtool.

  14. Memorandum "Open Metadata". Open Access to Documentation Forms and Item Catalogs in Healthcare.

    Science.gov (United States)

    Dugas, M; Jöckel, K-H; Friede, T; Gefeller, O; Kieser, M; Marschollek, M; Ammenwerth, E; Röhrig, R; Knaup-Gregori, P; Prokosch, H-U

    2015-01-01

    At present, most documentation forms and item catalogs in healthcare are not accessible to the public. This applies to assessment forms of routine patient care as well as case report forms (CRFs) of clinical and epidemiological studies. On behalf of the German chairs for Medical Informatics, Biometry and Epidemiology six recommendations to developers and users of documentation forms in healthcare were developed. Open access to medical documentation forms could substantially improve information systems in healthcare and medical research networks. Therefore these forms should be made available to the scientific community, their use should not be unduly restricted, they should be published in a sustainable way using international standards and sources of documentation forms should be referenced in scientific publications.

  15. Drinking water protection plan; a discussion document

    International Nuclear Information System (INIS)

    2001-01-01

    This draft document outlines the plan of action devised by the Government of British Columbia in an effort to safeguard the purity of the drinking water supply in the province, and invites British Columbians to participate in the elaboration of such a plan. This document concentrates on the assessment of the sources of the water supply (watersheds and aquifers) and on measures to ensure the integrity of the system of water treatment and distribution as the principal components of a comprehensive plan to protect drinking water. The proposed plan involves a multi-barrier approach that will use a combination of measures to ensure that water sources are properly managed and waterworks systems provide safe drinking water. New drinking water planning procedures, more effective local influence and authority, enforceable standards, better access to information and public education programs form the essence of the plan. A series of public meetings are scheduled to provide the public at large with opportunities to comment on the government's plan of action and to offer suggestions for additional measures

  16. CERN Sells its Electronic Document Handling System

    CERN Multimedia

    2001-01-01

    The EDH team. Left to right: Derek Mathieson, Rotislav Titov, Per Gunnar Jonsson, Ivica Dobrovicova, James Purvis. Missing from the photo is Jurgen De Jonghe. In a 1 MCHF deal announced this week, the British company Transacsys bought the rights to CERN's Electronic Document Handling (EDH) system, which has revolutionised the Laboratory's administrative procedures over the last decade. Under the deal, CERN and Transacsys will collaborate on developing EDH over the coming 12 months. CERN will provide manpower and expertise and will retain the rights to use EDH, which will also be available freely to other particle physics laboratories. This development is an excellent example of the active technology transfer policy CERN is currently pursuing. The negotiations were carried out through a fruitful collaboration between AS and ETT Divisions, following the recommendations of the Technology Advisory Board, and with the help of SPL Division. EDH was born in 1991 when John Ferguson and Achille Petrilli of AS Divisi...

  17. Biomass Assessment. Assessment of global biomass potentials and their links to food, water, biodiversity, energy demand and economy. Inventory and analysis of existing studies. Supporting document

    International Nuclear Information System (INIS)

    Dornburg, V.; Faaij, A.; Verweij, P.; Banse, M.; Van Diepen, K.; Van Keulen, H.; Langeveld, H.; Meeusen, M.; Van de Ven, G.; Wester, F.; Alkemade, R.; Ten Brink, B.; Van den Born, G.J.; Van Oorschot, M.; Ros, J.; Smout, F.; Van Vuuren, D.; Van den Wijngaart, R.; Aiking, H.; Londo, M.; Mozaffarian, H.; Smekens, K.; Lysen, E.

    2008-01-01

    This supporting document contains the result from the inventory phase of the biomass assessment of global biomass potentials and their links to food, water, biodiversity, energy demand and economy. This study provides a comprehensive assessment of global biomass potential estimates, focusing on the various factors affecting these potentials, such as food supplies, water use, biodiversity, energy demands and agro-economics

  18. TECHNICAL BASIS DOCUMENT FOR VENTILATION SYSTEM FILTRATION FAILURE LEADING TO AN UNFILTERED RELEASE

    Energy Technology Data Exchange (ETDEWEB)

    KOZLOWSKI, S.D.

    2005-01-06

    This document analyzed three scenarios involving failures of HEPA filtration systems leading to releases from liquid waste tanks. The scenarios are failure due to high temperature (fire), overpressure (filter blowout), and unfiltered release due to filter failure, improper installation. etc.

  19. Emergency Response Capability Baseline Needs Assessment - Compliance Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Sharry, John A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-09-01

    This document was prepared by John A. Sharry, LLNL Fire Marshal and Division Leader for Fire Protection and was reviewed by LLNL Emergency Management Department Head, James Colson. This document is the second of a two-part analysis on Emergency Response Capabilities of Lawrence Livermore National Laboratory. The first part, 2016 Baseline Needs Assessment Requirements Document established the minimum performance criteria necessary to meet mandatory requirements. This second part analyses the performance of Lawrence Livermore Laboratory Emergency Management Department to the contents of the Requirements Document. The document was prepared based on an extensive review of information contained in the 2016 BNA, a review of Emergency Planning Hazards Assessments, a review of building construction, occupancy, fire protection features, dispatch records, LLNL alarm system records, fire department training records, and fire department policies and procedures. The 2013 BNA was approved by NNSA’s Livermore Field Office on January 22, 2014.

  20. The database system for the management of technical documentations of PWR fuel design project using CD-ROM

    International Nuclear Information System (INIS)

    Park, Bong Sik; Lee, Won Jae; Ryu, Jae Kwon; Jo, In Hang; Chang, Jong Hwa.

    1996-12-01

    In this report, the database system developed for the management of technical documentation of PWR fuel design project using CD-ROM (compact disk - read only memory) is described. The database system, KIRDOCM (KAERI Initial and Reload Fuel project technical documentation management), is developed and installed on PC using Visual Foxpro 3.0. Descriptions are focused on the user interface of the KIRDOCM. Introduction addresses the background and concept of the development. The main chapter describes the user requirements, the analysis of computing environment, the design of KIRDOCM, the implementation of the KIRDOCM, user's manual of KIRDOCM and the maintenance of the KIRDOCM for future improvement. The implementation of KIRDOCM system provides the efficiency in the management, maintenance and indexing of the technical documents. And, it is expected that KIRDOCM may be a good reference in applying Visual Foxpro for the development of information management system. (author). 2 tabs., 13 figs., 8 refs

  1. A prototype of a documentation system that supports the development and maintenance of product configuration systems

    DEFF Research Database (Denmark)

    Haug, Anders; Degn, Anders; Poulsen, Bjarne

    2007-01-01

    , such as shorter lead times, reductions of resources needed and fewer errors. A procedure for the development and maintenance of PCSs, which has been applied in configuration projects for more than ten years, includes three main modelling techniques to support the development and maintenance of PCSs. Unfortunately...... system that supports the development and maintenance of PCSs. This article describes how some of this research has been converted into a prototype of a documentation system and what has been learned from the evaluation of the prototype...

  2. Time-motion analysis of clinical nursing documentation during implementation of an electronic operating room management system for ophthalmic surgery.

    Science.gov (United States)

    Read-Brown, Sarah; Sanders, David S; Brown, Anna S; Yackel, Thomas R; Choi, Dongseok; Tu, Daniel C; Chiang, Michael F

    2013-01-01

    Efficiency and quality of documentation are critical in surgical settings because operating rooms are a major source of revenue, and because adverse events may have enormous consequences. Electronic health records (EHRs) have potential to impact surgical volume, quality, and documentation time. Ophthalmology is an ideal domain to examine these issues because procedures are high-throughput and demand efficient documentation. This time-motion study examines nursing documentation during implementation of an EHR operating room management system in an ophthalmology department. Key findings are: (1) EHR nursing documentation time was significantly worse during early implementation, but improved to a level near but slightly worse than paper baseline, (2) Mean documentation time varied significantly among nurses during early implementation, and (3) There was no decrease in operating room turnover time or surgical volume after implementation. These findings have important implications for ambulatory surgery departments planning EHR implementation, and for research in system design.

  3. A study on development of guideline on writing technical document for electrical medical devices: Bone absorptiometric X-ray system

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sung Youl; Kim, Jae Ryang; Kim, Eun Rim; Lee, Jun Ho; Lee, Chang Hyung; Park, Chang Won [Medical Device Research Division, Ministry of Food and Drug Safety, Cheongju (Korea, Republic of)

    2016-06-15

    The market size of the bone absorptiometric X-ray system and the number of its approval by Ministry of Food and Drug Safety (MFDS) has annually increased, with a trend of increasing aging population and osteoporosis patients. For approval of manufactured or imported medical devices in Republic of Korea, it is required to submit its technical document. Therefore, it is need to develop the technical document guideline for the bone absorptiometric X-ray system for manufacturers, importers and reviewers. First of all, the technical documents which were already approved were examined and analyzed through MFDS approval administration system. Second, safety and performance test standards and methods that match international standards were drawn after conducting survey of the market status and the technology development trend for it, with examination and analysis of applicable domestic and overseas standards. Third, by operating industry-research-government cooperation, the guideline draft on writing technical document for the bone absorptiometric X-ray system was discussed, collecting their opinion. As a result, it is suitable to international and domestic condition, includes test evaluation methods and offer various information with appropriate examples to civil petitioner, when they write the technical documents.

  4. A study on development of guideline on writing technical document for electrical medical devices: Bone absorptiometric X-ray system

    International Nuclear Information System (INIS)

    Lee, Sung Youl; Kim, Jae Ryang; Kim, Eun Rim; Lee, Jun Ho; Lee, Chang Hyung; Park, Chang Won

    2016-01-01

    The market size of the bone absorptiometric X-ray system and the number of its approval by Ministry of Food and Drug Safety (MFDS) has annually increased, with a trend of increasing aging population and osteoporosis patients. For approval of manufactured or imported medical devices in Republic of Korea, it is required to submit its technical document. Therefore, it is need to develop the technical document guideline for the bone absorptiometric X-ray system for manufacturers, importers and reviewers. First of all, the technical documents which were already approved were examined and analyzed through MFDS approval administration system. Second, safety and performance test standards and methods that match international standards were drawn after conducting survey of the market status and the technology development trend for it, with examination and analysis of applicable domestic and overseas standards. Third, by operating industry-research-government cooperation, the guideline draft on writing technical document for the bone absorptiometric X-ray system was discussed, collecting their opinion. As a result, it is suitable to international and domestic condition, includes test evaluation methods and offer various information with appropriate examples to civil petitioner, when they write the technical documents

  5. Image quality assessment for video stream recognition systems

    Science.gov (United States)

    Chernov, Timofey S.; Razumnuy, Nikita P.; Kozharinov, Alexander S.; Nikolaev, Dmitry P.; Arlazarov, Vladimir V.

    2018-04-01

    Recognition and machine vision systems have long been widely used in many disciplines to automate various processes of life and industry. Input images of optical recognition systems can be subjected to a large number of different distortions, especially in uncontrolled or natural shooting conditions, which leads to unpredictable results of recognition systems, making it impossible to assess their reliability. For this reason, it is necessary to perform quality control of the input data of recognition systems, which is facilitated by modern progress in the field of image quality evaluation. In this paper, we investigate the approach to designing optical recognition systems with built-in input image quality estimation modules and feedback, for which the necessary definitions are introduced and a model for describing such systems is constructed. The efficiency of this approach is illustrated by the example of solving the problem of selecting the best frames for recognition in a video stream for a system with limited resources. Experimental results are presented for the system for identity documents recognition, showing a significant increase in the accuracy and speed of the system under simulated conditions of automatic camera focusing, leading to blurring of frames.

  6. Document imaging finding niche in petroleum industry

    International Nuclear Information System (INIS)

    Cisco, S.L.

    1992-01-01

    Optical disk-based document imaging systems can reduce operating costs, save office space, and improve access to necessary information for petroleum companies that have extensive records in various formats. These imaging systems help solve document management problems to improve technical and administrative operations. Enron Gas Pipeline Group has installed a document imaging system for engineering applications to integrate records stored on paper, microfilm, or computer-aided drafting (CAD) systems. BP Exploration Inc. recently implemented a document imaging system for administrative applications. The company is evaluating an expansion of the system to include engineering and technical applications. The petroleum industry creates, acquires, distributes, and retrieves enormous amounts of data and information, which are stored on multiple media, including paper, microfilm, and electronic formats. There are two main factors responsible for the immense information storage requirements in the petroleum industry

  7. Three tenets for secure cyber-physical system design and assessment

    Science.gov (United States)

    Hughes, Jeff; Cybenko, George

    2014-06-01

    This paper presents a threat-driven quantitative mathematical framework for secure cyber-physical system design and assessment. Called The Three Tenets, this originally empirical approach has been used by the US Air Force Research Laboratory (AFRL) for secure system research and development. The Tenets were first documented in 2005 as a teachable methodology. The Tenets are motivated by a system threat model that itself consists of three elements which must exist for successful attacks to occur: - system susceptibility; - threat accessibility and; - threat capability. The Three Tenets arise naturally by countering each threat element individually. Specifically, the tenets are: Tenet 1: Focus on What's Critical - systems should include only essential functions (to reduce susceptibility); Tenet 2: Move Key Assets Out-of-Band - make mission essential elements and security controls difficult for attackers to reach logically and physically (to reduce accessibility); Tenet 3: Detect, React, Adapt - confound the attacker by implementing sensing system elements with dynamic response technologies (to counteract the attackers' capabilities). As a design methodology, the Tenets mitigate reverse engineering and subsequent attacks on complex systems. Quantified by a Bayesian analysis and further justified by analytic properties of attack graph models, the Tenets suggest concrete cyber security metrics for system assessment.

  8. GUI-Based Document Access via SATCOMMS: Online Electronic Document Retrieval at the European Telecommunications Satellite Organization EUTELSAT.

    Science.gov (United States)

    Burton, Adrian P.

    1995-01-01

    Discusses accessing online electronic documents at the European Telecommunications Satellite Organization (EUTELSAT). Highlights include off-site paper document storage, the document management system, benefits, the EUTELSAT Standard IBM Access software, implementation, the development process, and future enhancements. (AEF)

  9. Document boundary determination using structural and lexical analysis

    Science.gov (United States)

    Taghva, Kazem; Cartright, Marc-Allen

    2009-01-01

    The document boundary determination problem is the process of identifying individual documents in a stack of papers. In this paper, we report on a classification system for automation of this process. The system employs features based on document structure and lexical content. We also report on experimental results to support the effectiveness of this system.

  10. Customer system efficiency improvement assessment: Supply curves for transmission and distribution conservation options

    Energy Technology Data Exchange (ETDEWEB)

    Tepel, R.C.; Callaway, J.W.; De Steese, J.G.

    1987-11-01

    This report documents the results of Task 6 in the Customer System Efficiency Improvement (CSEI) Assessment Project. A principal objective of this project is to assess the potential for energy conservation in the transmission and distribution (TandD) systems of electric utilities in the BPA service area. The scope of this assessment covers BPA customers in the Pacific Northwest region and all non-federal TandD systems, including those that currently place no load on the BPA system. Supply curves were developed to describe the conservation resource potentially available from TandD-system efficiency improvements. These supply curves relate the levelized cost of upgrading existing equipment to the estimated amount of energy saved. Stated in this form, the resource represented by TandD loss reductions can be compared with other conservation options and regional electrical generation resources to determine the most cost-effective method of supplying power to the Pacific Northwest. The development of the supply curves required data acquisition and methodology development that are also described in this report. 11 refs., 11 figs., 16 tabs.

  11. SUMO, System performance assessment for a high-level nuclear waste repository: Mathematical models

    International Nuclear Information System (INIS)

    Eslinger, P.W.; Miley, T.B.; Engel, D.W.; Chamberlain, P.J. II.

    1992-09-01

    Following completion of the preliminary risk assessment of the potential Yucca Mountain Site by Pacific Northwest Laboratory (PNL) in 1988, the Office of Civilian Radioactive Waste Management (OCRWM) of the US Department of Energy (DOE) requested the Performance Assessment Scientific Support (PASS) Program at PNL to develop an integrated system model and computer code that provides performance and risk assessment analysis capabilities for a potential high-level nuclear waste repository. The system model that has been developed addresses the cumulative radionuclide release criteria established by the US Environmental Protection Agency (EPA) and estimates population risks in terms of dose to humans. The system model embodied in the SUMO (System Unsaturated Model) code will also allow benchmarking of other models being developed for the Yucca Mountain Project. The system model has three natural divisions: (1) source term, (2) far-field transport, and (3) dose to humans. This document gives a detailed description of the mathematics of each of these three divisions. Each of the governing equations employed is based on modeling assumptions that are widely accepted within the scientific community

  12. Detailed Design Documentation, without the Pain

    Science.gov (United States)

    Ramsay, C. D.; Parkes, S.

    2004-06-01

    Producing detailed forms of design documentation, such as pseudocode and structured flowcharts, to describe the procedures of a software system:(1) allows software developers to model and discuss their understanding of a problem and the design of a solution free from the syntax of a programming language,(2) facilitates deeper involvement of non-technical stakeholders, such as the customer or project managers, whose influence ensures the quality, correctness and timeliness of the resulting system,(3) forms comprehensive documentation of the system for its future maintenance, reuse and/or redeployment.However, such forms of documentation require effort to create and maintain.This paper describes a software tool which is currently being developed within the Space Systems Research Group at the University of Dundee which aims to improve the utility of, and the incentive for, creating detailed design documentation for the procedures of a software system. The rationale for creating such a tool is briefly discussed, followed by a description of the tool itself, a summary of its perceived benefits, and plans for future work.

  13. OCRWM baseline management procedure for document identifiers

    International Nuclear Information System (INIS)

    1993-03-01

    This procedure establishes a uniform numbering system (document identifier) for all Program and project technical, cost, and schedule baselines, and selected management and procurement documents developed for and controlled by the Office of Civilian Radioactive Waste Management (OCRWM) for the Civilian Radioactive Waste Management System (CRWMS). The document identifier defined in this procedure is structured to ensure that the relational integrity between configuration items (CIs) and their associated documentation and software is maintained, traceable, categorical, and retrievable for the life of the program

  14. The Effect of an Electronic SBAR Communication Tool on Documentation of Acute Events in the Pediatric Intensive Care Unit.

    Science.gov (United States)

    Panesar, Rahul S; Albert, Ben; Messina, Catherine; Parker, Margaret

    2016-01-01

    The Situation, Background, Assessment, Recommendation (SBAR) handoff tool is designed to improve communication. The effects of integrating an electronic medical record (EMR) with a SBAR template are unclear. The research team hypothesizes that an electronic SBAR template improves documentation and communication between nurses and physicians. In all, 84 patient events were recorded from 542 admissions to the pediatric intensive care unit. Three time periods were studied: (a) paper documentation only, (b) electronic documentation, and (c) electronic documentation with an SBAR template. Documentation quality was assessed using a 4-point scoring system. The frequency of event notes increased progressively during the 3 study periods. Mean quality scores improved significantly from paper documentation to EMR free-text notes and to electronic SBAR-template notes, as did nurse and attending physician notification. The implementation of an electronic SBAR note is associated with more complete documentation and increased frequency of documentation of communication among nurses and physicians. © The Author(s) 2014.

  15. [Digitalization, archival storage and use of image documentation in the GastroBase-II system].

    Science.gov (United States)

    Kocna, P

    1997-05-14

    "GastroBase-II" is a module of the clinical information system "KIS-ComSyD"; The main part is represented by structured data-text with an expert system including on-line image digitalization in gastroenterology (incl. endoscopic, X-ray and endosonography pictures). The hardware and software of the GastroBase are described as well as six-years experiences with application of digitalized image data. An integration of a picture into text, reports, slides for a lecture or an electronic atlas is documented with examples. Briefly are reported out experiences with graphic editors (PhotoStyler), text editor (WordPerfect) and slide preparation for lecturing with the presentation software PowerPoint. The multimedia applications on the CD-ROM illustrate a modern trend using digitalized image documentation for pregradual and postgradual education.

  16. Review of SKB's Code Documentation and Testing

    International Nuclear Information System (INIS)

    Hicks, T.W.

    2005-01-01

    SKB is in the process of developing the SR-Can safety assessment for a KBS 3 repository. The assessment will be based on quantitative analyses using a range of computational codes aimed at developing an understanding of how the repository system will evolve. Clear and comprehensive code documentation and testing will engender confidence in the results of the safety assessment calculations. This report presents the results of a review undertaken on behalf of SKI aimed at providing an understanding of how codes used in the SR 97 safety assessment and those planned for use in the SR-Can safety assessment have been documented and tested. Having identified the codes us ed by SKB, several codes were selected for review. Consideration was given to codes used directly in SKB's safety assessment calculations as well as to some of the less visible codes that are important in quantifying the different repository barrier safety functions. SKB's documentation and testing of the following codes were reviewed: COMP23 - a near-field radionuclide transport model developed by SKB for use in safety assessment calculations. FARF31 - a far-field radionuclide transport model developed by SKB for use in safety assessment calculations. PROPER - SKB's harness for executing probabilistic radionuclide transport calculations using COMP23 and FARF31. The integrated analytical radionuclide transport model that SKB has developed to run in parallel with COMP23 and FARF31. CONNECTFLOW - a discrete fracture network model/continuum model developed by Serco Assurance (based on the coupling of NAMMU and NAPSAC), which SKB is using to combine hydrogeological modelling on the site and regional scales in place of the HYDRASTAR code. DarcyTools - a discrete fracture network model coupled to a continuum model, recently developed by SKB for hydrogeological modelling, also in place of HYDRASTAR. ABAQUS - a finite element material model developed by ABAQUS, Inc, which is used by SKB to model repository buffer

  17. Implementing the EuroFIR Document and Data Repositories as accessible resources of food composition information.

    Science.gov (United States)

    Unwin, Ian; Jansen-van der Vliet, Martine; Westenbrink, Susanne; Presser, Karl; Infanger, Esther; Porubska, Janka; Roe, Mark; Finglas, Paul

    2016-02-15

    The EuroFIR Document and Data Repositories are being developed as accessible collections of source documents, including grey literature, and the food composition data reported in them. These Repositories will contain source information available to food composition database compilers when selecting their nutritional data. The Document Repository was implemented as searchable bibliographic records in the Europe PubMed Central database, which links to the documents online. The Data Repository will contain original data from source documents in the Document Repository. Testing confirmed the FoodCASE food database management system as a suitable tool for the input, documentation and quality assessment of Data Repository information. Data management requirements for the input and documentation of reported analytical results were established, including record identification and method documentation specifications. Document access and data preparation using the Repositories will provide information resources for compilers, eliminating duplicated work and supporting unambiguous referencing of data contributing to their compiled data. Copyright © 2014 Elsevier Ltd. All rights reserved.

  18. Inter-professional electronic documents and child health: a study of persisting non-electronic communication in the use of electronic documents.

    Science.gov (United States)

    Saario, Sirpa; Hall, Christopher; Peckover, Sue

    2012-12-01

    Information and communication technologies are widely used in health and social care settings to replace previous means of record keeping, assessment and communication. Commentary on the strengths and weaknesses of such systems abound, thus it is useful to examine how they are used in practice. This article draws on findings from two separate studies, conducted between 2005 and 2007, which examined how child health and welfare professionals use electronic documents in Finland and England. Known respectively as Miranda and CAF, these systems are different in terms of structure and function but in their everyday use common features are identified, notably the continued use of and reliance on non-electronic means of communication. Based on interviews with professionals, three forms of non-electronic communication are described: alternative records, phone calls and letters, which facilitate the sharing of the electronic record. Finally, the electronic documents are further analysed as potential boundary objects which aim to create common understanding between sites and professionals. Copyright © 2012 Elsevier Ltd. All rights reserved.

  19. Guidance Document on Standardised Test Guidelines for Evaluating Chemicals for Endocrine Disruption

    DEFF Research Database (Denmark)

    Satya, Sneha; Wade, Mike; Hass, Ulla

    This guidance document was developed as a follow-up to the workshop on OECD countries’ activities regarding testing, assessment and management of endocrine disrupters, which was held in Copenhagen (Denmark) on 22-24 September 2010 (see document No. 118 published in the Series on Testing and Asses......This guidance document was developed as a follow-up to the workshop on OECD countries’ activities regarding testing, assessment and management of endocrine disrupters, which was held in Copenhagen (Denmark) on 22-24 September 2010 (see document No. 118 published in the Series on Testing...... on testing and assessment of endocrine disrupters (EDTA AG). In November 2010, comments were requested from the WNT, the EDTA AG, the Task Force on Hazard Assessment and experts involved in the assessment of chemicals. The EDTA AG addressed the comments from the WNT at a meeting held in April 2011...... the conclusions and next steps recommended in the draft guidance document are sensible and helpful when assessed in light of comprehensive datasets. The draft guidance document and the three case studies were reviewed again and revised at a meeting of the EDTA AG in December 2011. The draft guidance document...

  20. F-Area Seepage Basins: Environmental information document

    International Nuclear Information System (INIS)

    Corbo, P.; Killian, T.H.; Kolb, N.L.; Marine, I.W.

    1986-12-01

    This document provides environmental information on postulated closure options for the F-Area Seepage Basins at the Savannah River Plant and was developed as background technical documentation for the Department of Energy's proposed Environmental Impact Statement (EIS) on waste management activities for groundwater protection at the plant. The results of groundwater and atmospheric pathway analyses, accident analysis, and other environmental assessments discussed in this document are based upon a conservative analysis of all foreseeable scenarios as defined by the National Environmental Policy Act (40 CFR 1502.22). The scenarios do not necessarily represent actual environmental conditions. This document is not meant to represent or be used as a regulatory closure plan or other regulatory sufficient document. Technical assistance in the environmental analyses of waste site closures was provided by Clemson University; GeoTrans, Inc.; JBF Associates, Inc.; S.S. Papadopulos and Associates Inc.; Radiological Assessments Corporation; Rogers and Associates Engineering Corporation; Science Applications International Corporation; C.B. Shedrow Environmental Consultants, Inc.; Exploration Software; and Verbatim Typing and Editing

  1. Step 1: Human System Interface (HSI) Functional Requirements Document (FRD). Version 2

    Science.gov (United States)

    2006-01-01

    This Functional Requirements Document (FRD) establishes a minimum set of Human System Interface (HSI) functional requirements to achieve the Access 5 Vision of "operating High Altitude, Long Endurance (HALE) Unmanned Aircraft Systems (UAS) routinely, safely, and reliably in the National Airspace System (NAS)". Basically, it provides what functions are necessary to fly UAS in the NAS. The framework used to identify the appropriate functions was the "Aviate, Navigate, Communicate, and Avoid Hazards" structure identified in the Access 5 FRD. As a result, fifteen high-level functional requirements were developed. In addition, several of them have been decomposed into low-level functional requirements to provide more detail.

  2. Independent Orbiter Assessment (IOA): Assessment of the orbiter main propulsion system FMEA/CIL, volume 1

    Science.gov (United States)

    Slaughter, B. C.

    1988-01-01

    The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA effort first completed an analysis of the Main Propulsion System (MPS) hardware, generating draft failure modes and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The IOA results were then compared to available data from the Rockwell Downey/NASA JSC FMEA/CIL review. The Orbiter MPS is composed of the Propellant Management Subsystem (PMS) consisting of the liquid oxygen (LO2) and liquid hydrogen (LH2) subsystems and the helium subsystem. The PMS is a system of manifolds, distribution lines, and valves by which the liquid propellants pass from the External Tank to the Space Shuttle Main Engine (SSME). The helium subsystem consists of a series of helium supply tanks and their associated regulators, control valves, and distribution lines. Volume 1 contains the MPS description, assessment results, ground rules and assumptions, and some of the IOA worksheets.

  3. Content Documents Management

    Science.gov (United States)

    Muniz, R.; Hochstadt, J.; Boelke J.; Dalton, A.

    2011-01-01

    The Content Documents are created and managed under the System Software group with. Launch Control System (LCS) project. The System Software product group is lead by NASA Engineering Control and Data Systems branch (NEC3) at Kennedy Space Center. The team is working on creating Operating System Images (OSI) for different platforms (i.e. AIX, Linux, Solaris and Windows). Before the OSI can be created, the team must create a Content Document which provides the information of a workstation or server, with the list of all the software that is to be installed on it and also the set where the hardware belongs. This can be for example in the LDS, the ADS or the FR-l. The objective of this project is to create a User Interface Web application that can manage the information of the Content Documents, with all the correct validations and filters for administrator purposes. For this project we used one of the most excellent tools in agile development applications called Ruby on Rails. This tool helps pragmatic programmers develop Web applications with Rails framework and Ruby programming language. It is very amazing to see how a student can learn about OOP features with the Ruby language, manage the user interface with HTML and CSS, create associations and queries with gems, manage databases and run a server with MYSQL, run shell commands with command prompt and create Web frameworks with Rails. All of this in a real world project and in just fifteen weeks!

  4. Case study on traceable, transparent documentation to support decision-making on nuclear waste disposal

    International Nuclear Information System (INIS)

    McNeish, J.A.; Andrews, R.W.; Sevougian, S.D.; Dockery, H.A.; Wilson, M.L.; Gauthier, J.H.; Barnard, R.W.; Gaither, K.N.

    1999-01-01

    The recent assessment of the Yucca Mountain potential repository attempted to develop transparent and traceable documentation. The assessment was largely successful in this effort, providing meaningful graphics and easy to understand descriptions of the analyses for multiple audiences. While there are obviously many areas in the modeling and data collection that could be improved with sufficient resources, the document has been well received as an accurate, understandable assessment of the analyses. A few difficulties were encountered in the efforts to produce transparent and traceable documentation of the performance assessment analyses. Streamlining the text from a typical technical document to more of a layman's document, was not always easy. The data transfer steps that are proceduralized were not always smooth, as we worked out some of the bugs in the data transfer system. For some of the graphics, there was a mismatch between the analyst's hardware/software and the production hardware/software, causing difficulties in printing the graphics. One thing that was clear as the many organizations worked to pull the document together, is that relationships between people are still necessary in spite of all the technology brought to bear on the problem. A high level of cooperation and integration is necessary for the process to work smoothly. Significant effort is being made to continue to improve the processes that lead to traceability. Multiple teams are taking the sequencing of models/data apart and finding all of the transfers required as the project moves toward Site Recommendation and potential licensing. Likewise, the effort to achieve transparency is evolving and will improve with the next iteration of the analyses

  5. Nuclear plant service water system aging degradation assessment

    International Nuclear Information System (INIS)

    Jarrell, D.B.; Larson, L.L.; Stratton, R.C.; Bohn, S.J.; Gore, M.L.

    1992-10-01

    This report discusses the second phase of the aging assessment of nuclear plant service water systems (SWSs) which was performed by the Pacific Northwest Laboratory (PNL) to support the US Nuclear Regulatory Commission's (NRC's) Nuclear Plant Aging Research (NPAR) program. The SWS was selected for study because of its essential role in the mitigation of and recovery from accident scenarios involving the potential for core-melt, and because it is subject to a variety of aging mechanisms. The objectives of the SWS task under the NPAR program are to identify and characterize the principal age-related degradation mechanisms relevant to this system, to assess the impact of aging degradation on operational readiness, and to provide a methodology for the management of aging on the service water aspect of nuclear plant safety. The primary degradation mechanism in the SWSs as stated in the Phase I assessment and confirmed by the analysis in Phase II, is corrosion compounded by biologic and inorganic accumulation. It then follows that the most effective means for mitigating degradation in these systems is to pursue appropriate programs to effectively control the water chemistry properties when possible and to use biocidal agents where necessary. A methodology for producing a complete root-cause analysis was developed as a result of needs identified in the Phase I assessment for a more formal procedure that would lend itself to a generic, standardized approach. It is recommended that this, or a similar methodology, be required as a part of the documentation for corrective maintenance performed on the safety-related portions of SWSs to provide an accurate focus for effective management of aging

  6. Documentation pckage for the RFID temperature monitoring system (Of Model 9977 packages at NTS).

    Energy Technology Data Exchange (ETDEWEB)

    Chen, K.; Tsai, H.; Decision and Information Sciences

    2009-02-20

    The technical basis for extending the Model 9977 shipping package periodic maintenance beyond the one-year interval to a maximum of five years is based on the performance of the O-ring seals and the environmental conditions. The DOE Packaging Certification Program (PCP) has tasked Argonne National Laboratory to develop a Radio-Frequency Identification (RFID) temperature monitoring system for use by the facility personnel at DAF/NTS. The RFID temperature monitoring system, depicted in the figure below, consists of the Mk-1 RFId tags, a reader, and a control computer mounted on a mobile platform that can operate as a stand-alone system, or it can be connected to the local IT network. As part of the Conditions of Approval of the CoC, the user must complete the prescribed training to become qualified and be certified for operation of the RFID temperature monitoring system. The training course will be administered by Argonne National Laboratory on behalf of the Headquarters Certifying Official. This is a complete documentation package for the RFID temperature monitoring system of the Model 9977 packagings at NTS. The documentation package will be used for training and certification. The table of contents are: Acceptance Testing Procedure of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Acceptance Testing Result of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Performance Test of the Single Bolt Seal Sensor for the Model 9977 Packaging; Calibration of Built-in Thermistors in RFID Tags for Nevada Test Site; Results of Calibration of Built-in Thermistors in RFID Tags; Results of Thermal Calibration of Second Batch of MK-I RFID Tags; Procedure for Installing and Removing MK-1 RFID Tag on Model 9977 Drum; User Guide for RFID Reader and Software for Temperature Monitoring of Model 9977 Drums at NTS; Software Quality Assurance Plan (SQAP) for the ARG-US System; Quality Category for the RFID Temperature Monitoring System; The

  7. Dataset Documentation for the ERTMS-Oriented Signalling Maintenance in the Danish Railway System

    DEFF Research Database (Denmark)

    M. Pour, Shahrzad

    2017-01-01

    This documentation provides information about the dataset generated as part of a PhD thesis (Towards Signalling Maintenance Scheduling Problem for European Railway Traffic Management System ) for the signaling maintenance of the Danish railway system . The data instances (M.Pour 2018a; M.Pour 2018b......) have been created for the purpose of adaptation to the newest railway signalling standard which is so called European Railway Traffic Management System(ERTMS). The chapter provides explanation of the different types of maintenance tasks in the ERTMS, followed by data definition. Furthermore...

  8. Data management, documentation and analysis systems in radiation oncology: a multi-institutional survey

    International Nuclear Information System (INIS)

    Kessel, Kerstin A.; Combs, Stephanie E.

    2015-01-01

    Recently, information availability has become more elaborate and widespread, and treatment decisions are based on a multitude of factors. Gathering relevant data, also referred to as Big Data, is therefore critical for reaching the best patient care, and enhancing interdisciplinary and clinical research. Combining patient data from all involved systems is essential to prepare unstructured data for analyses. This demands special coordination in data management. Our study aims to characterize current developments in German-speaking hospital departments and practices. We successfully conducted the survey with the members of the Deutsche Gesellschaft für Radioonkologie (DEGRO). A questionnaire was developed consisting of 17 questions related to data management, documentation and clinical trial analyses, reflecting the clinical topics such as basic patient information, imaging, follow-up information as well as connection of documentation tools with radiooncological treatment planning machines. A total of 44 institutions completed the online survey (University hospitals n = 17, hospitals n = 13, practices/institutes n = 14). University hospitals, community hospitals and private practices are equally equipped concerning IT infrastructure for clinical use. However, private practices have a low interest in research work. All respondents stated the biggest obstacles about introducing a documentation system into their unit lie in funding and support of the central IT departments. Only 27 % (12/44) of responsible persons are specialists for documentation and data management. Our study gives an understanding of the challenges and solutions we need to be looking at for medical data storage. In the future, inter-departmental cross-links will enable the radiation oncology community to generate large-scale analyses. The online version of this article (doi:10.1186/s13014-015-0543-0) contains supplementary material, which is available to authorized users

  9. Let Documents Talk to Each Other: A Computer Model for Connection of Short Documents.

    Science.gov (United States)

    Chen, Z.

    1993-01-01

    Discusses the integration of scientific texts through the connection of documents and describes a computer model that can connect short documents. Information retrieval and artificial intelligence are discussed; a prototype system of the model is explained; and the model is compared to other computer models. (17 references) (LRW)

  10. TWRS technical baseline database manager definition document

    International Nuclear Information System (INIS)

    Acree, C.D.

    1997-01-01

    This document serves as a guide for using the TWRS Technical Baseline Database Management Systems Engineering (SE) support tool in performing SE activities for the Tank Waste Remediation System (TWRS). This document will provide a consistent interpretation of the relationships between the TWRS Technical Baseline Database Management software and the present TWRS SE practices. The Database Manager currently utilized is the RDD-1000 System manufactured by the Ascent Logic Corporation. In other documents, the term RDD-1000 may be used interchangeably with TWRS Technical Baseline Database Manager

  11. Evaluating current automatic de-identification methods with Veteran’s health administration clinical documents

    Directory of Open Access Journals (Sweden)

    Ferrández Oscar

    2012-07-01

    Full Text Available Abstract Background The increased use and adoption of Electronic Health Records (EHR causes a tremendous growth in digital information useful for clinicians, researchers and many other operational purposes. However, this information is rich in Protected Health Information (PHI, which severely restricts its access and possible uses. A number of investigators have developed methods for automatically de-identifying EHR documents by removing PHI, as specified in the Health Insurance Portability and Accountability Act “Safe Harbor” method. This study focuses on the evaluation of existing automated text de-identification methods and tools, as applied to Veterans Health Administration (VHA clinical documents, to assess which methods perform better with each category of PHI found in our clinical notes; and when new methods are needed to improve performance. Methods We installed and evaluated five text de-identification systems “out-of-the-box” using a corpus of VHA clinical documents. The systems based on machine learning methods were trained with the 2006 i2b2 de-identification corpora and evaluated with our VHA corpus, and also evaluated with a ten-fold cross-validation experiment using our VHA corpus. We counted exact, partial, and fully contained matches with reference annotations, considering each PHI type separately, or only one unique ‘PHI’ category. Performance of the systems was assessed using recall (equivalent to sensitivity and precision (equivalent to positive predictive value metrics, as well as the F2-measure. Results Overall, systems based on rules and pattern matching achieved better recall, and precision was always better with systems based on machine learning approaches. The highest “out-of-the-box” F2-measure was 67% for partial matches; the best precision and recall were 95% and 78%, respectively. Finally, the ten-fold cross validation experiment allowed for an increase of the F2-measure to 79% with partial matches

  12. Engineering Assessment and Certification of Integrity of the 177-R2 tank system

    International Nuclear Information System (INIS)

    Graser, D.A.; Schwartz, W.W.

    1993-10-01

    This Engineering Assessment and Certification of Integrity of retention tanks 177-R2U1, 177-R2Al, and 177-R2A2 has been prepared in response to 40 CFR 265.192(a) and 22 CCR 66265.192(a) for new tank systems that store hazardous waste and have secondary containment. The regulations require that this assessment be completed and certified by an independent, qualified, California-registered professional engineer before the tank system is placed in use as a hazardous waste storage tank system. The technical assessments for the 177-R2Ul, 177-R2A1, and 177-R2A2 tank systems have been reviewed by an independent, qualified, California-registered professional engineer, who has certified that the tank systems have sufficient structural integrity, are acceptable for transferring and storing hazardous waste, are compatible with the stored waste, and the tanks and containment system are suitably designed to achieve the requirements of the applicable regulations so they will not collapse, rupture, or fail. This document will be kept on file by the Lawrence Livermore National Laboratory (LLNL) Environment Protection Department

  13. Assessment of LANL hazardous waste management documentation

    International Nuclear Information System (INIS)

    Davis, K.D.; Hoevemeyer, S.S.; Stirrup, T.S.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to present findings from evaluating the Los Alamos National Laboratory (LANL) ''Hazardous Waste Acceptance Criteria Receipt at TA-54, Area L'' to determine if it meets applicable DOE requirements. The guidelines and requirements for the establishment of a Hazardous Waste Acceptance Criteria (HW-WAC) are found in 40 CFR 260 to 270 and DOE Order 5820.2A. Neither set of requirements specifically require a WAC for the management of hazardous waste; however, the use of such documentation is logical and is consistent with the approach required for the management of radioactive waste. The primary purpose of a HW-WAC is to provide generators and waste management with established criteria that must be met before hazardous waste can be acceptable for treatment, storage and/or disposal. An annotated outline for a generic waste acceptance criteria was developed based on the requirements of 40 CFR 260 to 270 and DOE Order 5820.2A. The outline contains only requirements for hazardous waste, it does not address the radiological components of low-level mixed waste. The outline generated from the regulations was used for comparison to the LANL WAC For Chemical and Low-level Mixed Waste Receipt at TA-54, Area L. The major elements that should be addressed by a hazardous waste WAC were determined to be as follows: Waste Package/Container Requirements, Waste Forms, Land Disposal Restrictions, and Data Package-Certification ampersand Documentation

  14. Structural integrity assessments for the category C liquid low-level waste tank systems at the Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document provides a report of the efforts made to satisfy the Federal Facility Agreement (FFA) for the structural integrity certification of 14 Category C Liquid Low Level Waste (LLLW) Tank Systems on the Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. Within this document, each tank system is described including the associated pipeline segments evaluated as a part of those tank systems. A separate structural integrity assessment was conducted for each of the LLLW Tank Systems, four of which are located in Melton Valley, and ten of which are located in Bethel Valley. The results of the structural integrity assessments are reported herein. The assessments are based on (1) a review of available tank design drawings, (2) a qualitative assessment of corrosion on the tank and pipelines, and primarily, and (3) leak testing program results. Design plans and specifications were reviewed for a general description of the tanks and associated pipelines. Information of primary significance included tank age, material of construction, tank design and construction specifications. Design plans were also reviewed for the layouts and materials of pipeline constructions, and ages of pipelines. Next, a generic corrosion assessment was conducted for each tank system. Information was gathered, when available, related to the historical use of the tank and the likely contents. The corrosion assessments included a qualitative evaluation of the walls of each tank and pipelines associated with each tank, as well as the welds and joints of the systems. A general discussion of the stainless steel types encountered is included in Section 4.0 of this report. The potential for soils to have caused corrosion is also evaluated within the sections on the individual tank systems.

  15. Modified Hazard Ranking System/Hazard Ranking System for sites with mixed radioactive and hazardous wastes: Software documentation

    Energy Technology Data Exchange (ETDEWEB)

    Stenner, R.D.; Peloquin, R.A.; Hawley, K.A.

    1986-11-01

    The mHRS/HRS software package was developed by the Pacific Northwest Laboratory (PNL) under contract with the Department of Energy (DOE) to provide a uniform method for DOE facilities to use in performing their Conservation Environmental Response Compensation and Liability Act (CERCLA) Phase I Modified Hazard Ranking System or Hazard Ranking System evaluations. The program is designed to remove the tedium and potential for error associated with the performing of hand calculations and the interpreting of information on tables and in reference books when performing an evaluation. The software package is designed to operate on a microcomputer (IBM PC, PC/XT, or PC/AT, or a compatible system) using either a dual floppy disk drive or a hard disk storage system. It is written in the dBASE III language and operates using the dBASE III system. Although the mHRS/HRS software package was developed for use at DOE facilities, it has direct applicability to the performing of CERCLA Phase I evaluations for any facility contaminated by hazardous waste. The software can perform evaluations using either the modified hazard ranking system methodology developed by DOE/PNL, the hazard ranking system methodology developed by EPA/MITRE Corp., or a combination of the two. This document is a companion manual to the mHRS/HRS user manual. It is intended for the programmer who must maintain the software package and for those interested in the computer implementation. This manual documents the system logic, computer programs, and data files that comprise the package. Hardware and software implementation requirements are discussed. In addition, hand calculations of three sample situations (problems) with associated computer runs used for the verification of program calculations are included.

  16. Modified Hazard Ranking System/Hazard Ranking System for sites with mixed radioactive and hazardous wastes: Software documentation

    International Nuclear Information System (INIS)

    Stenner, R.D.; Peloquin, R.A.; Hawley, K.A.

    1986-11-01

    The mHRS/HRS software package was developed by the Pacific Northwest Laboratory (PNL) under contract with the Department of Energy (DOE) to provide a uniform method for DOE facilities to use in performing their Conservation Environmental Response Compensation and Liability Act (CERCLA) Phase I Modified Hazard Ranking System or Hazard Ranking System evaluations. The program is designed to remove the tedium and potential for error associated with the performing of hand calculations and the interpreting of information on tables and in reference books when performing an evaluation. The software package is designed to operate on a microcomputer (IBM PC, PC/XT, or PC/AT, or a compatible system) using either a dual floppy disk drive or a hard disk storage system. It is written in the dBASE III language and operates using the dBASE III system. Although the mHRS/HRS software package was developed for use at DOE facilities, it has direct applicability to the performing of CERCLA Phase I evaluations for any facility contaminated by hazardous waste. The software can perform evaluations using either the modified hazard ranking system methodology developed by DOE/PNL, the hazard ranking system methodology developed by EPA/MITRE Corp., or a combination of the two. This document is a companion manual to the mHRS/HRS user manual. It is intended for the programmer who must maintain the software package and for those interested in the computer implementation. This manual documents the system logic, computer programs, and data files that comprise the package. Hardware and software implementation requirements are discussed. In addition, hand calculations of three sample situations (problems) with associated computer runs used for the verification of program calculations are included

  17. ClinGen Pathogenicity Calculator: a configurable system for assessing pathogenicity of genetic variants.

    Science.gov (United States)

    Patel, Ronak Y; Shah, Neethu; Jackson, Andrew R; Ghosh, Rajarshi; Pawliczek, Piotr; Paithankar, Sameer; Baker, Aaron; Riehle, Kevin; Chen, Hailin; Milosavljevic, Sofia; Bizon, Chris; Rynearson, Shawn; Nelson, Tristan; Jarvik, Gail P; Rehm, Heidi L; Harrison, Steven M; Azzariti, Danielle; Powell, Bradford; Babb, Larry; Plon, Sharon E; Milosavljevic, Aleksandar

    2017-01-12

    The success of the clinical use of sequencing based tests (from single gene to genomes) depends on the accuracy and consistency of variant interpretation. Aiming to improve the interpretation process through practice guidelines, the American College of Medical Genetics and Genomics (ACMG) and the Association for Molecular Pathology (AMP) have published standards and guidelines for the interpretation of sequence variants. However, manual application of the guidelines is tedious and prone to human error. Web-based tools and software systems may not only address this problem but also document reasoning and supporting evidence, thus enabling transparency of evidence-based reasoning and resolution of discordant interpretations. In this report, we describe the design, implementation, and initial testing of the Clinical Genome Resource (ClinGen) Pathogenicity Calculator, a configurable system and web service for the assessment of pathogenicity of Mendelian germline sequence variants. The system allows users to enter the applicable ACMG/AMP-style evidence tags for a specific allele with links to supporting data for each tag and generate guideline-based pathogenicity assessment for the allele. Through automation and comprehensive documentation of evidence codes, the system facilitates more accurate application of the ACMG/AMP guidelines, improves standardization in variant classification, and facilitates collaborative resolution of discordances. The rules of reasoning are configurable with gene-specific or disease-specific guideline variations (e.g. cardiomyopathy-specific frequency thresholds and functional assays). The software is modular, equipped with robust application program interfaces (APIs), and available under a free open source license and as a cloud-hosted web service, thus facilitating both stand-alone use and integration with existing variant curation and interpretation systems. The Pathogenicity Calculator is accessible at http

  18. ANALYZED FACTORS THAT LEADS TO THE BALANCED SCORECARD NURSING CARE DOCUMENTATION AT RUMAH SAKIT JIWA MENUR SURABAYA

    Directory of Open Access Journals (Sweden)

    Yuli Anggraini

    2017-04-01

    Full Text Available Introduction: Nursing documentation is an important aspect of nursing practice so that should be assessed comprehensively. The objective of the study was to analyze the causing factor of nursing care documentation at Rumah Sakit Jiwa Menur Surabaya through balanced scorecard. Method: This research was an analytical descriptive conducted out on January 2010 at Rumah Sakit Jiwa Menur Surabaya that measured nursing care documentation through four perspectives of balanced scorecard by distributing quisioner to 55 nurses and 69 customers (patient families using inclusion criteria, and holding personal interview to 3 structural offi cial, 2 functional official, and 6 ward supervisors. Data of nurse education, percentage of trained nurse was gained by checklist. Data were analyzed using content analysis to fi nd the causing factor of nursing documentation within balanced scorecard. Result: The result showed that financial, internal business processes, and learning and growth perspectives had causal relationship with nursing care documentation at Rumah Sakit Jiwa Menur Surabaya, but customer perspective didn’t have direct causal relationship with it. Discussion: It can be concluded that impractical nursing documentation form especially in dimension of time on assessment, implementation, and evaluation, and comprehension on assessment, absence of physical nursing standards, limited knowledge on nursing documentation evoked by absence of inhouse training about nursing documentation, ineffective supervision and audit were factors which affecting nursing documentation at Rumah Sakit Jiwa Menur Surabaya. The researcher recommended that the hospital manager should modificate the nursing documentation form using NIC & NOC of NANDA and computerized system, compose physical nursing standards, carry out advanced nursing education and inhouse training about nursing care documentation, improve supervision program, and nursing documentation audit.

  19. 76 FR 58509 - Release of Risk and Exposure Assessment Planning Document for the Review of the National Ambient...

    Science.gov (United States)

    2011-09-21

    ... Assessment Planning Document for the Review of the National Ambient Air Quality Standards for Lead AGENCY... available for public review the Review of the National Ambient Air Quality Standards for Lead: Risk and... and/or welfare effects in this review of the national ambient air quality standards (NAAQS) for lead...

  20. Systematic, Multimethod Assessment of Adaptations Across Four Diverse Health Systems Interventions

    Directory of Open Access Journals (Sweden)

    Borsika A. Rabin

    2018-04-01

    Full Text Available BackgroundMany health outcomes and implementation science studies have demonstrated the importance of tailoring evidence-based care interventions to local context to improve fit. By adapting to local culture, history, resources, characteristics, and priorities, interventions are more likely to lead to improved outcomes. However, it is unclear how best to adapt evidence-based programs and promising innovations. There are few guides or examples of how to best categorize or assess health-care adaptations, and even fewer that are brief and practical for use by non-researchers.Materials and methodsThis study describes the importance and potential of assessing adaptations before, during, and after the implementation of health systems interventions. We present a promising multilevel and multimethod approach developed and being applied across four different health systems interventions. Finally, we discuss implications and opportunities for future research.ResultsThe four case studies are diverse in the conditions addressed, interventions, and implementation strategies. They include two nurse coordinator-based transition of care interventions, a data and training-driven multimodal pain management project, and a cardiovascular patient-reported outcomes project, all of which are using audit and feedback. We used the same modified adaptation framework to document changes made to the interventions and implementation strategies. To create the modified framework, we started with the adaptation and modification model developed by Stirman and colleagues and expanded it by adding concepts from the RE-AIM framework. Our assessments address the intuitive domains of Who, How, When, What, and Why to classify and organize adaptations. For each case study, we discuss how the modified framework was operationalized, the multiple methods used to collect data, results to date and approaches utilized for data analysis. These methods include a real-time tracking system and

  1. Audit of Orthopaedic Surgical Documentation

    Directory of Open Access Journals (Sweden)

    Fionn Coughlan

    2015-01-01

    Full Text Available Introduction. The Royal College of Surgeons in England published guidelines in 2008 outlining the information that should be documented at each surgery. St. James’s Hospital uses a standard operation sheet for all surgical procedures and these were examined to assess documentation standards. Objectives. To retrospectively audit the hand written orthopaedic operative notes according to established guidelines. Methods. A total of 63 operation notes over seven months were audited in terms of date and time of surgery, surgeon, procedure, elective or emergency indication, operative diagnosis, incision details, signature, closure details, tourniquet time, postop instructions, complications, prosthesis, and serial numbers. Results. A consultant performed 71.4% of procedures; however, 85.7% of the operative notes were written by the registrar. The date and time of surgery, name of surgeon, procedure name, and signature were documented in all cases. The operative diagnosis and postoperative instructions were frequently not documented in the designated location. Incision details were included in 81.7% and prosthesis details in only 30% while the tourniquet time was not documented in any. Conclusion. Completion and documentation of operative procedures were excellent in some areas; improvement is needed in documenting tourniquet time, prosthesis and incision details, and the location of operative diagnosis and postoperative instructions.

  2. Data management for the Clinch River Breeder Reactor Plant Project by use of document status and hold systems

    International Nuclear Information System (INIS)

    Hunt, C.S.; Beck, A.E.; Akhtar, M.S.

    1982-01-01

    This paper describes the development, framework, and scope of the Document Status System and the Document Hold System for the Clinch River Breeder Reactor Plant Project. It shows how data are generated at five locations and transmitted to a central computer for processing and storage. The resulting computerized data bank provides reports needed to perform day-to-day management and engineering planning. Those reports also partially satisfy the requirements of the Project's Quality Assurance Program

  3. PADS (Patient Archiving and Documentation System): a computerized patient record with educational aspects.

    Science.gov (United States)

    Hohnloser, J H; Pürner, F

    1992-01-01

    Rapid acquisition and analysis of information in an Intensive Care Unit (ICU) setting is essential, even more so the documentation of the decision making process which has vital consequences for the lives of ICU patients. We describe an Ethernet based local area network (LAN) with clinical workstations (Macintosh fx, ci). Our Patient Archiving and Documentation System (PADS) represents a computerized patient record presently used in a university hospitals' ICU. Taking full advantage of the Macintosh based graphical user interface (GUI) our system enables nurses and doctors to perform the following tasks: admission, medical history taking, physical examination, generation of problem lists and follow up notes, access to laboratory data and reports, semiautomatic generation of a discharge summary including full word processor capabilities. Furthermore, the system offers rapid, consistent and complete automatic encoding of diagnoses following the International Classification of Disease (ICD; WHO, [1]). For educational purposes the user can also view disease entities or complications related to the diagnoses she/he encoded. The system has links to other educational programs such as cardiac auscultation. A MEDLINE literature search through a CD-ROM based system can be performed without exiting the system; also, CD-ROM based medical textbooks can be accessed as well. Commercially available Macintosh programs can be integrated in the system without existing the main program thus enabling users to customize their working environment. Additional options include automatic background monitoring of users learning behavior, analyses and graphical display of numerous epidemiological and health care related problems. Furthermore, we are in the process of integrating sound and digital video in our system. This system represents one in a line of modular departmental models which will eventually be integrated to form a decentralized Hospital Information System (HIS).

  4. Storing XML Documents in Databases

    OpenAIRE

    Schmidt, A.R.; Manegold, Stefan; Kersten, Martin; Rivero, L.C.; Doorn, J.H.; Ferraggine, V.E.

    2005-01-01

    textabstractThe authors introduce concepts for loading large amounts of XML documents into databases where the documents are stored and maintained. The goal is to make XML databases as unobtrusive in multi-tier systems as possible and at the same time provide as many services defined by the XML standards as possible. The ubiquity of XML has sparked great interest in deploying concepts known from Relational Database Management Systems such as declarative query languages, transactions, indexes ...

  5. Software requirements specification document for the AREST code development

    International Nuclear Information System (INIS)

    Engel, D.W.; McGrail, B.P.; Whitney, P.D.; Gray, W.J.; Williford, R.E.; White, M.D.; Eslinger, P.W.; Altenhofen, M.K.

    1993-11-01

    The Analysis of the Repository Source Term (AREST) computer code was selected in 1992 by the U.S. Department of Energy. The AREST code will be used to analyze the performance of an underground high level nuclear waste repository. The AREST code is being modified by the Pacific Northwest Laboratory (PNL) in order to evaluate the engineered barrier and waste package designs, model regulatory compliance, analyze sensitivities, and support total systems performance assessment modeling. The current version of the AREST code was developed to be a very useful tool for analyzing model uncertainties and sensitivities to input parameters. The code has also been used successfully in supplying source-terms that were used in a total systems performance assessment. The current version, however, has been found to be inadequate for the comparison and selection of a design for the waste package. This is due to the assumptions and simplifications made in the selection of the process and system models. Thus, the new version of the AREST code will be designed to focus on the details of the individual processes and implementation of more realistic models. This document describes the requirements of the new models that will be implemented. Included in this document is a section describing the near-field environmental conditions for this waste package modeling, description of the new process models that will be implemented, and a description of the computer requirements for the new version of the AREST code

  6. BNL ALARA Center's development of a computerized radiological assessment and design system (RADS)

    International Nuclear Information System (INIS)

    Dionne, B.J.; Masciulli, S.; Connelly, J.M.

    1993-01-01

    The US Department of Energy's (DOE) Office of Health Physics and Industrial Hygiene sponsored a study of Radiological Engineering Programs at selected DOE contractor facilities. This study was conducted to review, evaluate, and summarize techniques and practices that should be considered in the design phase that reduce dose and the spread of radioactive materials during subsequent construction and operation of DOE radiological facilities. As in a previous study on operational ALARA programs, a variety of good-practice documents will be generated. It is envisioned that these documents will serve as a resource to assist radiological engineers in the process of designing radiological facilities, and in performing radiological safety/ALARA design reviews. This paper presents the features for three good-practice documents and related software applications that are being developed based on the findings of this study. The proposed software called Radiological Assessment and Design System (RADS) will be a menu-driven database and spreadsheet program. It will be designed to provide easy, consistent, and effective implementation of the methodologies described in the three good-practice documents. These documents and the associated RADS software will provide the user with the following three functions: (1) enter dose assessment information and data into computer worksheets and provide printed tables of the results which can then be inserted into safety analysis reports or cost-benefit analyses, (2) perform a wide variety of sorts of radiological design criteria from DOE Orders and produce a checklist of the desired design criteria, and (3) enter cost/benefit data and qualitative rating of attributes for various design alternatives which reduce dose into computer worksheets and provide printed reports of cost-effectiveness results

  7. Embedding the shapes of regions of interest into a Clinical Document Architecture document.

    Science.gov (United States)

    Minh, Nguyen Hai; Yi, Byoung-Kee; Kim, Il Kon; Song, Joon Hyun; Binh, Pham Viet

    2015-03-01

    Sharing a medical image visually annotated by a region of interest with a remotely located specialist for consultation is a good practice. It may, however, require a special-purpose (and most likely expensive) system to send and view them, which is an unfeasible solution in developing countries such as Vietnam. In this study, we design and implement interoperable methods based on the HL7 Clinical Document Architecture and the eXtensible Markup Language Stylesheet Language for Transformation standards to seamlessly exchange and visually present the shapes of regions of interest using web browsers. We also propose a new integration architecture for a Clinical Document Architecture generator that enables embedding of regions of interest and simultaneous auto-generation of corresponding style sheets. Using the Clinical Document Architecture document and style sheet, a sender can transmit clinical documents and medical images together with coordinate values of regions of interest to recipients. Recipients can easily view the documents and display embedded regions of interest by rendering them in their web browser of choice. © The Author(s) 2014.

  8. TECHNICAL DOCUMENT PREPARATION PLAN FOR THE RETRIEVABILITY STRATEGY REPORT

    International Nuclear Information System (INIS)

    P.D. Gehner

    1997-01-01

    The objective of this systems study is to produce a waste removability strategy document that contains sufficient details, recommended design alternatives, and the technical rationale (a) to support Licensing in the development of the License Application Plan, and (b) to provide input in the form of design requirements, for the FY 97 Retrieval Design & Operation activity in support of viability assessment. The intent of this systems study is to support a decision on how to proceed with design with respect to retrievability, regarding the extent to which the repository/waste package designs should accommodate the retrieval option

  9. The study on the quality assurance of performance assessment for the disposal system

    International Nuclear Information System (INIS)

    Fusaeda, Shigeki; Yanagisawa, Ichiro; Katsurai, Kiyomichi; Ueda, Noriaki; Takeishi, Masayuki; Ida, Toshio; Imamura, Naoko

    1999-02-01

    The purpose of performance assessment of the geological disposal system in the second progress report is to quantitatively evaluate the performance in the near-field. For this purpose, validation of performance models and quality assurance of data used in the performance assessment are important technical subjects. To achieve the subjects, the quality of the procedure of analysis work and data acquisition work must be assured in addition to the quality assurance of data, models and analysis codes. In addition, to assure results of the performance assessment by integrating these qualities is an important matter. The following studies have been performed in order to improve the computer environment for controlling the quality information relating to the performance assessment, and to develop the integrated quality assurance system which can give reliability of the results of the performance assessment in the second progress report. (1) The study of quality assurance framework. In order to assure reliability of MESHNOTE3, we have carried out validation analysis based on experimental data and insite data. And we have revised the quality assurance manual in order to be applicable to preparing documents. We have carried out validation analysis/planning based on the experimental data which is acquired from 'Measurement of Apparent Diffusion Coefficient of 99 Tc in Compacted Bentonite with Fe powder', and confirmed validity of MESHNOTE3. We have added a postscript on the management of analysis documents to the quality assurance manual. (2) The development of the quality assurance computer system. In order to improve reliability of the analysis results and to efficiently use the quality assurance program, the quality assurance computer system on the basis of analysis management system CAPASA has been improved as follows. Database for radionuclide transport calculations that can control geometry of engineered barriers, data relating to glass dissolution and dose rate

  10. The use of DBMS and document oriented interface in the TPLAN-system

    International Nuclear Information System (INIS)

    Fernandez, F.N.

    1994-01-01

    The paper describes the user-friendly input/output interface (DOI) for the TPLAN database management system that includes high quality output in Latex format from databases and retrieves selected information from Latex document (according to a specific grammar that includes a subset of the Latex grammar) to be stored in the databases. The TPLAN system was developed to manage the annual Topical Plan of JINR. It was written in 'C' and DOS Fox Base/Fox Pro for IBM comparable personal computer. It was also proto typed in Visual Basic and Windows Access using standard V B controls. 8 refs.; 7 figs. (author)

  11. Applications for electronic documents

    International Nuclear Information System (INIS)

    Beitel, G.A.

    1995-01-01

    This paper discusses the application of electronic media to documents, specifically Safety Analysis Reports (SARs), prepared for Environmental Restoration and Waste Management (ER ampersand WM) programs being conducted for the Department of Energy (DOE) at the Idaho National Engineering Laboratory (INEL). Efforts are underway to upgrade our document system using electronic format. To satisfy external requirements (DOE, State, and Federal), ER ampersand WM programs generate a complement of internal requirements documents including a SAR and Technical Safety Requirements along with procedures and training materials. Of interest, is the volume of information and the difficulty in handling it. A recently prepared ER ampersand WM SAR consists of 1,000 pages of text and graphics; supporting references add 10,000 pages. Other programmatic requirements documents consist of an estimated 5,000 pages plus references

  12. Lifecycle management for nuclear engineering project documents

    International Nuclear Information System (INIS)

    Zhang Li; Zhang Ming; Zhang Ling

    2010-01-01

    The nuclear engineering project documents with great quantity and various types of data, in which the relationships of each document are complex, the edition of document update frequently, are managed difficultly. While the safety of project even the nuclear safety is threatened seriously by the false documents and mistakes. In order to ensure the integrality, veracity and validity of project documents, the lifecycle theory of document is applied to build documents center, record center, structure and database of document lifecycle management system. And the lifecycle management is used to the documents of nuclear engineering projects from the production to pigeonhole, to satisfy the quality requirement of nuclear engineering projects. (authors)

  13. Program information architecture/document hierarchy. [Information Management Systems, it's components and rationale

    Energy Technology Data Exchange (ETDEWEB)

    Woods, T.W.

    1991-09-01

    The Nuclear Waste Management System (NWMS) Management Systems Improvement Strategy (MSIS) (DOE 1990) requires that the information within the computer program and information management system be ordered into a precedence hierarchy for consistency. Therefore, the US Department of Energy (DOE). Office of Civilian Radioactive Waste Management (OCRWM) requested Westinghouse Hanford Company to develop a plan for NWMS program information which the MSIS calls a document hierarchy. This report provides the results of that effort and describes the management system as a program information architecture.'' 3 refs., 3 figs.

  14. A Cognitive Model of Document Use during a Research Project. Study I. Document Selection.

    Science.gov (United States)

    Wang, Peiling; Soergel, Dagobert

    1998-01-01

    Proposes a model of document selection by real users of a bibliographic retrieval system. Reports on Part I of a longitudinal study of decision making on document use by academics (25 faculty and graduate students in Agricultural Economics). Examines what components are relevant to the users' decisions and what cognitive process may have occurred…

  15. Storing XML Documents in Databases

    NARCIS (Netherlands)

    A.R. Schmidt; S. Manegold (Stefan); M.L. Kersten (Martin); L.C. Rivero; J.H. Doorn; V.E. Ferraggine

    2005-01-01

    textabstractThe authors introduce concepts for loading large amounts of XML documents into databases where the documents are stored and maintained. The goal is to make XML databases as unobtrusive in multi-tier systems as possible and at the same time provide as many services defined by the XML

  16. Recommended documentation for computer users at ANL

    Energy Technology Data Exchange (ETDEWEB)

    Heiberger, A.A.

    1992-04-01

    Recommended Documentation for Computer Users at ANL is for all users of the services available from the Argonne National Laboratory (ANL) Computing and Telecommunications Division (CTD). This document will guide you in selecting available documentation that will best fill your particular needs. Chapter 1 explains how to use this document to select documents and how to obtain them from the CTD Document Distribution Counter. Chapter 2 contains a table that categorizes available publications. Chapter 3 gives descriptions of the online DOCUMENT command for CMS, and VAX, and the Sun workstation. DOCUMENT allows you to scan for and order documentation that interests you. Chapter 4 lists publications by subject. Categories I and IX cover publications of a general nature and publications on telecommunications and networks respectively. Categories II, III, IV, V, VI, VII, VIII, and X cover publications on specific computer systems. Category XI covers publications on advanced scientific computing at Argonne. Chapter 5 contains abstracts for each publication, all arranged alphabetically. Chapter 6 describes additional publications containing bibliographies and master indexes that the user may find useful. The appendix identifies available computer systems, applications, languages, and libraries.

  17. A Model of Electronic Document Management System for Limited Partnership

    OpenAIRE

    Faiqunisa, Faiqunisa; Nugroho, Eko; Santosa, Paulus Insap

    2013-01-01

    Both types of documents, electronic and non-electronic are a major component supporting activities. In addition to the documents, communications capabilities to employees and managers effectively with other stakeholders are one of the important key achievements of organizational goals. LP. XYZ is one of the Consultants in the field of Information Technology, but the storage and management of electronic documents and archives themselves carried on a server without a management information sy...

  18. Electronic document management at Sizewell B

    International Nuclear Information System (INIS)

    Rippon, Simon.

    1996-01-01

    Sizewell ''B'', Britain's first PWR, officially opened on March 25 1996, will now rely for its document management on a sophisticated computer-based system. One of the largest single engineering projects ever to be commissioned on one site in Britain, Sizewell ''B'' accommodates more than 300,000 documents, including over 200,000 drawings. The electronic document management system will provide a number of important benefits, including a more direct method of maintaining the station's Configuration Management and hence maintaining high safety standards; improved turnaround in plant modification proposals (PMP); significant time and cost savings in managing vital records; and increased productivity. (Author)

  19. Total System Performance Assessment Sensitivity Analyses for Final Nuclear Regulatory Commission Regulations

    International Nuclear Information System (INIS)

    Bechtel SAIC Company

    2001-01-01

    This Letter Report presents the results of supplemental evaluations and analyses designed to assess long-term performance of the potential repository at Yucca Mountain. The evaluations were developed in the context of the Nuclear Regulatory Commission (NRC) final public regulation, or rule, 10 CFR Part 63 (66 FR 55732 [DIRS 156671]), which was issued on November 2, 2001. This Letter Report addresses the issues identified in the Department of Energy (DOE) technical direction letter dated October 2, 2001 (Adams 2001 [DIRS 156708]). The main objective of this Letter Report is to evaluate performance of the potential Yucca Mountain repository using assumptions consistent with performance-assessment-related provisions of 10 CFR Part 63. The incorporation of the final Environmental Protection Agency (EPA) standard, 40 CFR Part 197 (66 FR 32074 [DIRS 155216]), and the analysis of the effect of the 40 CFR Part 197 EPA final rule on long-term repository performance are presented in the Total System Performance Assessment--Analyses for Disposal of Commercial and DOE Waste Inventories at Yucca Mountain--Input to Final Environmental Impact Statement and Site Suitability Evaluation (BSC 2001 [DIRS 156460]), referred to hereafter as the FEIS/SSE Letter Report. The Total System Performance Assessment (TSPA) analyses conducted and documented prior to promulgation of the NRC final rule 10 CFR Part 63 (66 FR 55732 [DIRS 156671]), were based on the NRC proposed rule (64 FR 8640 [DIRS 101680]). Slight differences exist between the NRC's proposed and final rules which were not within the scope of the FEIS/SSE Letter Report (BSC 2001 [DIRS 156460]), the Preliminary Site Suitability Evaluation (PSSE) (DOE 2001 [DIRS 155743]), and supporting documents for these reports. These differences include (1) the possible treatment of ''unlikely'' features, events and processes (FEPs) in evaluation of both the groundwater protection standard and the human-intrusion scenario of the individual

  20. Rangeland resource trends in the United States: A technical document supporting the 2000 USDA Forest Service RPA Assessment

    Science.gov (United States)

    John E. Mitchell

    2000-01-01

    This report documents trends in America's rangelands as required by the Renewable Resources Planning Act of 1974. The Forest Service has conducted assessments of the rangeland situation for 30 years. Over this period, rangeland values and uses have gradually shifted from concentrating upon forage production and meeting increasing demand for red meat to a more...

  1. Assessment of LANL asbestos waste management documentation

    International Nuclear Information System (INIS)

    Davis, K.D.; Hoevemeyer, S.S.; Stirrup, T.S.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The intent of this effort is to evaluate the Los Alamos National Laboratory (LANL) Waste Acceptance Criteria (WAC) for asbestos to determine if it meets applicable DOE, EPA, and OSHA requirements. There are numerous regulations that provide specific guidelines on the management of asbestos waste. An annotated outline for a generic asbestos WAC was developed using the type of information specified by 5820.2A. The outline itself is included in Appendix A. The major elements that should be addressed by the WAC were determined to be as follows: Waste Forms; Waste Content/Concentration; Waste Packaging; and Waste Documentation/Certification

  2. SITE WIDE SHORT CIRCUIT STUDY ASSESSMENT

    International Nuclear Information System (INIS)

    CARRATT, R.T.

    2004-01-01

    The Department of Energy requested that Fluor Hanford develop a plan to update the electrical distribution studies for FH managed facilities. Toward this end, an assessment of FH's nuclear facilities was performed to determine whether a current short circuit study of the facility electrical distribution system exists, and the status of such study. This report presents the methodology and results of that assessment. The assessment identified 29 relevant facilities. Of these, a short circuit study could not be identified for 15 facilities. A short circuit study was found to exist for fourteen facilities, however, of these 14, four were not released into a controlled document system, and two were not performed for the entire electrical distribution system. It is recommended that for four of the facilities no further action is required based upon the limited nature of the existing electrical system, or as in the case of PFP, the status of the existing short circuit study was determined adequate. For the majority of the facilities without a short circuit study, it is recommended that one is performed, and released into a controlled document system. Two facilities require further evaluation due to missing or conflicting documentation. For the remainder of the facilities, the recommendations are to review and revise as appropriate the existing study, and release into a controlled document system. A summation of the recommendations is presented

  3. Independent Orbiter Assessment (IOA): Assessment of the orbital maneuvering system FMEA/CIL, volume 1

    Science.gov (United States)

    Prust, Chet D.; Haufler, W. A.; Marino, A. J.

    1988-01-01

    The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA effort first completed an analysis of the Orbital Maneuvering System (OMS) hardware and Electrical Power Distribution and Control (EPD and C), generating draft failure modes and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The IOA results were then compared to the proposed Post 51-L NASA FMEA/CIL baseline. This report documents the results of that comparison for the Orbiter OMS hardware. The IOA analysis defined the OMS as being comprised of the following subsystems: helium pressurization, propellant storage and distribution, Orbital Maneuvering Engine, and EPD and C. The IOA product for the OMS analysis consisted of 284 hardware and 667 EPD and C failure mode worksheets that resulted in 160 hardware and 216 EPD and C potential critical items (PCIs) being identified. A comparison was made of the IOA product to the NASA FMEA/CIL baseline which consisted of 101 hardware and 142 EPD and C CIL items.

  4. Creating and Evaluating a Hypertext System of Documenting Analytical Test Methods in a Chemical Plant Quality Assurance Laboratory.

    Science.gov (United States)

    White, Charles E., Jr.

    The purpose of this study was to develop and implement a hypertext documentation system in an industrial laboratory and to evaluate its usefulness by participative observation and a questionnaire. Existing word-processing test method documentation was converted directly into a hypertext format or "hyperdocument." The hyperdocument was designed and…

  5. Needs assessment for remote systems technology at the Chornobyl Unit 4 shelter

    International Nuclear Information System (INIS)

    Carteret, B.A.; Holliday, M.A.; Jones, E.D.

    1997-12-01

    The accident at Chornobyl Unit 4 on April 26, 1986, resulted in a series of unprecedented scientific and technical challenges. The reactor building was damaged extensively. Following the accident, immediate action was needed to seal off the gaping crater created by the accident, which was a continuing source of airborne contamination. Under extreme conditions, a structure called the open-quotes Shelterclose quotes was built over the remains of the reactor building. The Shelter, which was quickly completed in November 1986, was meant to provide immediate but temporary containment. Now, 11 years later, there are significant concerns about its structural integrity and projected life expectancy. The United States and other participating G-7 countries are supporting nuclear safety upgrade efforts in Eastern Europe with a primary focus on placing the Chornobyl Nuclear Power Plant (ChNPP) Unit 4 Shelter in a stable and environmentally acceptable condition. Application of remote systems technologies will play an important part in achieving the goals of this program. The G-7 nations have agreed to support these efforts, including the identification and development of remote system technologies for fuel removal. However at this time they have taken a firm stance against funding actual fuel removal activities. The U.S. Department of Energy Office of Nuclear Energy, Science and Technology requested that a needs assessment be performed to evaluate the requirements for applying remote systems, including robotics, at the Shelter. This document is intended to be used to identify remote systems needs and requirements at the Shelter and to provide general information on the conditions in the Shelter that could impact the use of remote systems. This document is intended as a source of information to assist those who will be implementing the Shelter Implementation Plan tasks. The document provides background information and general guidance on the application of remote systems

  6. Randomised trial comparing the recording ability of a novel, electronic emergency documentation system with the AHA paper cardiac arrest record.

    Science.gov (United States)

    Grigg, Eliot; Palmer, Andrew; Grigg, Jeffrey; Oppenheimer, Peter; Wu, Tim; Roesler, Axel; Nair, Bala; Ross, Brian

    2014-10-01

    To evaluate the ability of an electronic system created at the University of Washington to accurately document prerecorded VF and pulseless electrical activity (PEA) cardiac arrest scenarios compared with the American Heart Association paper cardiac arrest record. 16 anaesthesiology residents were randomly assigned to view one of two prerecorded, simulated VF and PEA scenarios and asked to document the event with either the paper or electronic system. Each subject then repeated the process with the other video and documentation method. Five types of documentation errors were defined: (1) omission, (2) specification, (3) timing, (4) commission and (5) noise. The mean difference in errors between the paper and electronic methods was analysed using a single factor repeated measures ANOVA model. Compared with paper records, the electronic system omitted 6.3 fewer events (95% CI -10.1 to -2.5, p=0.003), which represents a 28% reduction in omission errors. Users recorded 2.9 fewer noise items (95% CI -5.3 to -0.6, p=0.003) when compared with paper, representing a 36% decrease in redundant or irrelevant information. The rate of timing (Δ=-3.2, 95% CI -9.3 to 3.0, p=0.286) and commission (Δ=-4.4, 95% CI -9.4 to 0.5, p=0.075) errors were similar between the electronic system and paper, while the rate of specification errors were about a third lower for the electronic system when compared with the paper record (Δ=-3.2, 95% CI -6.3 to -0.2, p=0.037). Compared with paper documentation, documentation with the electronic system captured 24% more critical information during a simulated medical emergency without loss in data quality. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  7. Technical basis document for internal dosimetry

    CERN Document Server

    Hickman, D P

    1991-01-01

    This document provides the technical basis for the Chem-Nuclear Geotech (Geotech) internal dosimetry program. Geotech policy describes the intentions of the company in complying with radiation protection standards and the as low as reasonably achievable (ALARA) program. It uses this policy and applicable protection standards to derive acceptable methods and levels of bioassay to assure compliance. The models and computational methods used are described in detail within this document. FR-om these models, dose- conversion factors and derived limits are computed. These computations are then verified using existing documentation and verification information or by demonstration of the calculations used to obtain the dose-conversion factors and derived limits. Recommendations for methods of optimizing the internal dosimetry program to provide effective monitoring and dose assessment for workers are provided in the last section of this document. This document is intended to be used in establishing an accredited dosi...

  8. LCS Content Document Application

    Science.gov (United States)

    Hochstadt, Jake

    2011-01-01

    My project at KSC during my spring 2011 internship was to develop a Ruby on Rails application to manage Content Documents..A Content Document is a collection of documents and information that describes what software is installed on a Launch Control System Computer. It's important for us to make sure the tools we use everyday are secure, up-to-date, and properly licensed. Previously, keeping track of the information was done by Excel and Word files between different personnel. The goal of the new application is to be able to manage and access the Content Documents through a single database backed web application. Our LCS team will benefit greatly with this app. Admin's will be able to login securely to keep track and update the software installed on each computer in a timely manner. We also included exportability such as attaching additional documents that can be downloaded from the web application. The finished application will ease the process of managing Content Documents while streamlining the procedure. Ruby on Rails is a very powerful programming language and I am grateful to have the opportunity to build this application.

  9. The disposal of Canada's nuclear fuel waste: postclosure assessment of a reference system

    International Nuclear Information System (INIS)

    Goodwin, B.W.; McConnell, D.B.; Andres, T.H.

    1994-01-01

    The concept for disposal of Canada's nuclear fuel waste is based on a vault located deep in plutonic rock of the Canadian Shield. We document in this report a method to assess the long-term impacts of a disposal facility for nuclear fuel waste. The assessment integrates relevant information from engineering design studies, site investigations, laboratory studies, expert judgment and detailed mathematical analyses to evaluate system performance in terms of safety criteria, guidelines and standards. The method includes the use of quantitative tools such as the Systems Variability Analysis computer Code (SYVAC) to deal with parameter uncertainty and the use of reasoned arguments based on well-established scientific principles. We also document the utility of the method by describing its application to a hypothetical implementation of the concept called the reference disposal system. The reference disposal system generally conforms to the overall characteristics of the concept, except we have made some specific site and design choices so that the assessment would be more realistic. To make the reference system more representative of a real system, we have used the geological observations of the AECL's Whiteshell Research Area located near Lac du Bonnet, Manitoba, to define the characteristics of the geosphere and the groundwater flow system. This research area has been subject to more than a decade of geological and hydrological studies. The analysis of the reference disposal system provides estimates of radiological and chemical toxicity impacts on members of a critical group and estimates of possible impacts on the environment. The latter impacts include estimates of radiation dose to nonhuman organisms. Other quantitative analyses examine the use of derived constraints to improve the margin of safety, the effectiveness of engineered and natural barriers, and the sensitivity of the results to influential features, events, and processes of the reference disposal

  10. Spent Nuclear Fuel Project Document Management Plan

    International Nuclear Information System (INIS)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed

  11. Extremely secure identification documents

    International Nuclear Information System (INIS)

    Tolk, K.M.; Bell, M.

    1997-09-01

    The technology developed in this project uses biometric information printed on the document and public key cryptography to ensure that an adversary cannot issue identification documents to unauthorized individuals or alter existing documents to allow their use by unauthorized individuals. This process can be used to produce many types of identification documents with much higher security than any currently in use. The system is demonstrated using a security badge as an example. This project focused on the technologies requiring development in order to make the approach viable with existing badge printing and laminating technologies. By far the most difficult was the image processing required to verify that the picture on the badge had not been altered. Another area that required considerable work was the high density printed data storage required to get sufficient data on the badge for verification of the picture. The image processing process was successfully tested, and recommendations are included to refine the badge system to ensure high reliability. A two dimensional data array suitable for printing the required data on the badge was proposed, but testing of the readability of the array had to be abandoned due to reallocation of the budgeted funds by the LDRD office

  12. Old TNX Seepage Basin: Environmental information document

    International Nuclear Information System (INIS)

    Dunaway, J.K.; Johnson, W.F.; Kingley, L.E.; Simmons, R.V.; Bledsoe, H.W.; Smith, J.A.

    1986-12-01

    This document provides environmental information on postulated closure options for the Old TNX Seepage Basin at the Savannah River Plant and was developed as background technical documentation for the Department of Energy's proposed Environmental Impact Statement (EIS) on waste management activities for groundwater protection at the plant. The results of groundwater and atmospheric pathway analyses, accident analysis, and other environmental assessments discussed in this document are based upon a conservative analysis of all foreseeable scenarios as defined by the National Environmental Policy Act (40 CFR 1500-1508). The scenarios do not necessarily represent actual environmental conditions. This document is not meant to be used as a regulatory closure plan or other regulatory document to comply with required federal or state environmental regulations

  13. INTERTRAN: A system for assessing the impact from transporting radioactive material

    International Nuclear Information System (INIS)

    Ericsson, A.M.; Elert, M.

    1983-05-01

    The document presents a system, provided to the IAEA by the Swedish Nuclear Power Inspectorate, which offers a simple method to assess the impact from any transportation of packages of radioactive materials. The first part gives a detailed description of the model, giving examples of both incident-free calculations and accident calculations. Input parameters are described in a next section. The effect of a variation of an input variable on the output (sensitivity analysis) is estimated in another section, and, finally, a description of the computer code (named INTERTRAN) and of its input and output is given. The system is intended as a model easy to handle and use by all IAEA Member States

  14. Feature, event, and process screening and scenario development for the yucca mountain total system performance assessment

    International Nuclear Information System (INIS)

    Swift, P.; Barr, G.; Barnard, R.; Rechard, R.; Schenker, A.; Freeze, G.; Burck, P.

    2001-01-01

    Scenario development has two primary purposes in the design and documentation of postclosure performance assessments in a regulatory setting. First, scenario development ensures a sufficiently comprehensive consideration of the possible future states of the system. Second, scenario development identifies the important scenarios that must be considered in quantitative analyses of the total system performance assessment (TSPA). To ensure clear documentation of the treatment of potentially relevant future states of the system in the Yucca Mountain license application (LA), the US Department of Energy (DOE) has chosen to adopt a scenario development process based on the methodology developed by Cranwell et al. (1990) for the US Nuclear Regulatory Commission (NRC). Although the process, described below, has been modified somewhat as a result of experience gained in the last decade, the underlying methodology is consistent with that outlined by the DOE in the 1988 Site Characterization Plan for the Yucca Mountain Project (YMP) (U.S. DOE, 1988). The approach is fundamentally the same as that used in many performance assessments, including the most recent analysis of the Yucca Mountain repository by the NRC (Wescott et al., 1995). The approach has also been used by the DOE for the Waste Isolation Pilot Plant (WIPP) (U.S. DOE, 1996), by the Nuclear Energy Agency (NEA) of the Organisation for Economic Co-Operation and Development (OECD), and by other radioactive waste programs internationally. Section 2.0 of this report describes the scenario development process. Steps in the process are described in Section 2.1, and terms introduced in this section are defined in Section 2.2. The electronic database used to document the process is described in Section 3, and Section 4 provides a summary of the current status of the YMP scenario development work. Section 5 contains acknowledgments, and Section 6 contains a list of the references cited. (authors)

  15. Document clustering methods, document cluster label disambiguation methods, document clustering apparatuses, and articles of manufacture

    Science.gov (United States)

    Sanfilippo, Antonio [Richland, WA; Calapristi, Augustin J [West Richland, WA; Crow, Vernon L [Richland, WA; Hetzler, Elizabeth G [Kennewick, WA; Turner, Alan E [Kennewick, WA

    2009-12-22

    Document clustering methods, document cluster label disambiguation methods, document clustering apparatuses, and articles of manufacture are described. In one aspect, a document clustering method includes providing a document set comprising a plurality of documents, providing a cluster comprising a subset of the documents of the document set, using a plurality of terms of the documents, providing a cluster label indicative of subject matter content of the documents of the cluster, wherein the cluster label comprises a plurality of word senses, and selecting one of the word senses of the cluster label.

  16. Development of the Quality of Australian Nursing Documentation in Aged Care (QANDAC) instrument to assess paper-based and electronic resident records.

    Science.gov (United States)

    Wang, Ning; Björvell, Catrin; Hailey, David; Yu, Ping

    2014-12-01

    To develop an Australian nursing documentation in aged care (Quality of Australian Nursing Documentation in Aged Care (QANDAC)) instrument to measure the quality of paper-based and electronic resident records. The instrument was based on the nursing process model and on three attributes of documentation quality identified in a systematic review. The development process involved five phases following approaches to designing criterion-referenced measures. The face and content validities and the inter-rater reliability of the instrument were estimated using a focus group approach and consensus model. The instrument contains 34 questions in three sections: completion of nursing history and assessment, description of care process and meeting the requirements of data entry. Estimates of the validity and inter-rater reliability of the instrument gave satisfactory results. The QANDAC instrument may be a useful audit tool for quality improvement and research in aged care documentation. © 2013 ACOTA.

  17. Light Duty Utility Arm interface control document plan

    Energy Technology Data Exchange (ETDEWEB)

    Engstrom, J.W.

    1994-12-27

    This document describes the interface control documents that will be used to identify and control interface features throughout all phases of the Light Duty Utility Arm (LDUA) development and design. After the system is built, delivered and installed in the Cold Test Facility and later at the tank farm, the Interface Control Documents can be used in maintaining the configuration control process. The Interface Control Document will consist of Interface Control Drawings and a data base directly tied to the Interface Control Drawings. The data base can be used as an index to conveniently find interface information. Design drawings and other text documents that contain interface information will appear in the database. The Interface Control Drawings will be used to document and control the data and information that define the interface boundaries between systems, subsystems and equipment. Also, the interface boundaries will define the areas of responsibility for systems and subsystems. The drawing will delineate and identify all the physical and functional interfaces that required coordination to establish and maintain compatibility between the co-functioning equipment, computer software, and the tank farm facilities. An appendix contains the Engineering interface control database system riser manual.

  18. Light Duty Utility Arm interface control document plan

    International Nuclear Information System (INIS)

    Engstrom, J.W.

    1994-01-01

    This document describes the interface control documents that will be used to identify and control interface features throughout all phases of the Light Duty Utility Arm (LDUA) development and design. After the system is built, delivered and installed in the Cold Test Facility and later at the tank farm, the Interface Control Documents can be used in maintaining the configuration control process. The Interface Control Document will consist of Interface Control Drawings and a data base directly tied to the Interface Control Drawings. The data base can be used as an index to conveniently find interface information. Design drawings and other text documents that contain interface information will appear in the database. The Interface Control Drawings will be used to document and control the data and information that define the interface boundaries between systems, subsystems and equipment. Also, the interface boundaries will define the areas of responsibility for systems and subsystems. The drawing will delineate and identify all the physical and functional interfaces that required coordination to establish and maintain compatibility between the co-functioning equipment, computer software, and the tank farm facilities. An appendix contains the Engineering interface control database system riser manual

  19. Technical basis document for internal dosimetry

    International Nuclear Information System (INIS)

    Hickman, D.P.

    1991-01-01

    This document provides the technical basis for the Chem-Nuclear Geotech (Geotech) internal dosimetry program. Geotech policy describes the intentions of the company in complying with radiation protection standards and the as low as reasonably achievable (ALARA) program. It uses this policy and applicable protection standards to derive acceptable methods and levels of bioassay to assure compliance. The models and computational methods used are described in detail within this document. FR-om these models, dose- conversion factors and derived limits are computed. These computations are then verified using existing documentation and verification information or by demonstration of the calculations used to obtain the dose-conversion factors and derived limits. Recommendations for methods of optimizing the internal dosimetry program to provide effective monitoring and dose assessment for workers are provided in the last section of this document. This document is intended to be used in establishing an accredited dosimetry program in accordance with expected Department of Energy Laboratory Accreditation Program (DOELAP) requirements for the selected radionuclides provided in this document, including uranium mill tailing mixtures. Additions and modifications to this document and procedures derived FR-om this document are expected in the future according to changes in standards and changes in programmatic mission

  20. Comparing a rule based vs. statistical system for automatic categorization of MEDLINE documents according to biomedical specialty

    OpenAIRE

    Humphrey, Susanne M.; Névéol, Aurélie; Browne, Allen; Gobeill, Julien; Ruch, Patrick; Darmoni, Stéfan J.

    2010-01-01

    Automatic document categorization is an important research problem in Information Science and Natural Language Processing. Many applications, including Word Sense Disambiguation and Information Retrieval in large collections, can benefit from such categorization. This paper focuses on automatic categorization of documents from the biomedical literature into broad discipline-based categories. Two different systems are described and contrasted: CISMeF, which uses rules based on human indexing o...

  1. Using computerized provider order entry to enforce documentation of tests with pending results at hospital discharge.

    Science.gov (United States)

    Cadwallader, J; Asirwa, C; Li, X; Kesterson, J; Tierney, W M; Were, M C

    2012-01-01

    Small numbers of tests with pending results are documented in hospital discharge summaries leading to breakdown in communication and medical errors due to inadequate followup. Evaluate effect of using a computerized provider order entry (CPOE) system to enforce documentation of tests with pending results into hospital discharge summaries. We assessed the percent of all tests with pending results and those with actionable results that were documented before (n = 182 discharges) and after (n = 203 discharges) implementing the CPOE-enforcement tool. We also surveyed providers (n = 52) about the enforcement functionality. Documentation of all tests with pending results improved from 12% (87/701 tests) before to 22% (178/812 tests) (p = 0.02) after implementation. Documentation of tests with eventual actionable results increased from 0% (0/24) to 50% (14/28)(ppending results into discharge summaries significantly increased documentation rates, especially of actionable tests. However, gaps in documentation still exist.

  2. Nagra technical report 14-03, characteristic dosage intervals and documentation for the assessment of barrier systems

    International Nuclear Information System (INIS)

    2014-12-01

    This comprehensive technical report published by the Swiss National Cooperative for the Disposal of Radioactive Wastes Nagra discusses the procedure for selecting sites for deep geological repositories for all categories of radioactive waste produced in Switzerland, as defined in the conceptual part of the Sectoral Plan for Deep Geological Repositories (BFE 2008). Analyses are presented and discussed that determine the priority host rocks for the disposal of low, intermediate and high level radioactive wastes. The evaluation of the effectiveness of the barrier systems is discussed. Also, analyses are presented and discussed in connection with the regions where sites for the repositories may be located. Important site-specific geological information is examined which is to be used in the assessment of possible repository sites from the safety analysis point of view

  3. Prevalence of accurate nursing documentation in patient records

    NARCIS (Netherlands)

    Paans, Wolter; Sermeus, Walter; Nieweg, Roos; van der Schans, Cees

    2010-01-01

    AIM: This paper is a report of a study conducted to describe the accuracy of nursing documentation in patient records in hospitals. Background.  Accurate nursing documentation enables nurses to systematically review the nursing process and to evaluate the quality of care. Assessing nurses' reports

  4. 48 CFR 215.406-3 - Documenting the negotiation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Documenting the negotiation. 215.406-3 Section 215.406-3 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.406-3 Documenting the...

  5. Systemic Assessment as a New Tool for Assessing Students ...

    African Journals Online (AJOL)

    Systemic Assessment as a New Tool for Assessing Students Learning in Chemistry using SATL Methods: Systemic Matching, Systemic Synthesis, Systemic Analysis, Systemic Synthetic – Analytic, as Systemic Question Types.

  6. Principles of reusability of XML-based enterprise documents

    Directory of Open Access Journals (Sweden)

    Roman Malo

    2010-01-01

    Full Text Available XML (Extensible Markup Language represents one of flexible platforms for processing enterprise documents. Its simple syntax and powerful software infrastructure for processing this type of documents is a guarantee for high interoperability of individual documents. XML is today one of technologies influencing all aspects of ICT area.In the paper questions and basic principles of reusing XML-based documents are described in the field of enterprise documents. If we use XML databases or XML data types for storing these types of documents then partial redundancy could be expected due to possible documents’ similarity. This similarity can be found especially in documents’ structure and also in documents’ content and its elimination is necessary part of data optimization.The main idea of the paper is focused to possibilities how to think about dividing complex XML docu­ments into independent fragments that can be used as standalone documents and how to process them.Conclusions could be applied within software tools working with XML-based structured data and documents as document management systems or content management systems.

  7. Document and author promotion strategies in the secure wiki model

    DEFF Research Database (Denmark)

    Lindberg, Kasper; Jensen, Christian D.

    2012-01-01

    Wiki systems form a subclass of the more general Open Collaborative Authoring Systems, where content is created by a user community. The ability of anyone to edit the content is, at the same time, their strength and their weakness. Anyone can write documents that improve the value of the wiki-system......, but this also means that anyone can introduce errors into documents, either by accident or on purpose. A security model for wiki-style authoring systems, called the Secure Wiki Model, has previously been proposed to address this problem. This model is designed to prevent corruption of good quality documents......, by limiting updates, to such documents, to users who have demonstrated their ability to produce documents of similar or better quality. While this security model prevents all user from editing all documents, it does respect the wiki philosophy by allowing any author who has produced documents of a certain...

  8. Crew Health Care System (CHeCS) Design Research, Documentations, and Evaluations

    Science.gov (United States)

    CLement, Bethany M.

    2011-01-01

    The Crew Health Care System (CHeCS) is a group within the Space Life Science Directorate (SLSD) that focuses on the overall health of astronauts by reinforcing the three divisions - the Environmental Maintenance System (EMS), the Countermeasures System (CMS), and the Health Maintenance System (HMS). This internship provided opportunity to gain knowledge, experience, and skills in CHeCS engineering and operations tasks. Various and differing tasks allowed for occasions to work independently, network to get things done, and show leadership abilities. Specific exercises included reviewing hardware certification, operations, and documentation within the ongoing Med Kit Redesign (MKR) project, and learning, writing, and working various common pieces of paperwork used in the engineering and design process. Another project focused on the distribution of various pieces of hardware to off-site research facilities with an interest in space flight health care. The main focus of this internship, though, was on a broad and encompassing understanding of the engineering process as time was spent looking at each individual step in a variety of settings and tasks.

  9. Using an Educational Electronic Documentation System to Help Nursing Students Accurately Identify Nursing Diagnoses

    Science.gov (United States)

    Pobocik, Tamara J.

    2013-01-01

    The use of technology and electronic medical records in healthcare has exponentially increased. This quantitative research project used a pretest/posttest design, and reviewed how an educational electronic documentation system helped nursing students to identify the accurate related to statement of the nursing diagnosis for the patient in the case…

  10. FLAMMABLE GAS TECHNICAL BASIS DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    KRIPPS, L.J.

    2005-03-03

    This document describes the qualitative evaluation of frequency and consequences for DST and SST representative flammable gas accidents and associated hazardous conditions without controls. The evaluation indicated that safety-significant structures, systems and components (SSCs) and/or technical safety requirements (TSRs) were required to prevent or mitigate flammable gas accidents. Discussion on the resulting control decisions is included. This technical basis document was developed to support WP-13033, Tank Farms Documented Safety Analysis (DSA), and describes the risk binning process for the flammable gas representative accidents and associated represented hazardous conditions. The purpose of the risk binning process is to determine the need for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the event frequency and consequence.

  11. Magnetic fusion: Environmental Readiness Document

    International Nuclear Information System (INIS)

    1981-03-01

    Environmental Readiness Documents are prepared periodically to review and evaluate the environmental status of an energy technology during the several phases of development of that technology. Through these documents, the Office of Environment within the Department of Energy provides an independent and objective assessment of the environmental risks and potential impacts associated with the progression of the technology to the next stage of development and with future extensive use of the technology. This Environmental Readiness Document was prepared to assist the Department of Energy in evaluating the readiness of magnetic fusion technology with respect to environmental issues. An effort has been made to identify potential environmental problems that may be encountered based upon current knowledge, proposed and possible new environmental regulations, and the uncertainties inherent in planned environmental research

  12. PFP MICON DCS computer software documentation

    Energy Technology Data Exchange (ETDEWEB)

    Silvan, G.R.

    1996-03-26

    This document contains the complete printout of the MICON A/S system configuration used in the Plutonium Finishing Plant. The document is divided into several volumes. Volume 1 covers the workstation display and configuration. All other volumes contain the controller configurations, or programs.

  13. PFP MICON DCS computer software documentation

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1996-01-01

    This document contains the complete printout of the MICON A/S system configuration used in the Plutonium Finishing Plant. The document is divided into several volumes. Volume 1 covers the workstation display and configuration. All other volumes contain the controller configurations, or programs

  14. Databases in the documentation management for big industrial projects

    International Nuclear Information System (INIS)

    Cauchet, A.; Chevillard, F.; Parisot, Y.; Tirefort, C.

    1990-05-01

    The documentation management of a big industrial project involves a continuous update of information, both in the study and realization phase or in the operation phase. The organization of the technical documentation for big industrial projects requests complex information systems. In the first part of this paper are presented the methods appropriate for the analysis of documentation management procedures and in the second part are presented the tools by the combination of which a documentation system for the user is provided. The case of the documentation centres for the Hague reprocessing plant is described

  15. Readiness Assessment Plan, Hanford 200 areas treated effluent disposal facilities

    International Nuclear Information System (INIS)

    Ulmer, F.J.

    1995-01-01

    This Readiness Assessment Plan documents Liquid Effluent Facilities review process used to establish the scope of review, documentation requirements, performance assessment, and plant readiness to begin operation of the Treated Effluent Disposal system in accordance with DOE-RLID-5480.31, Startup and Restart of Facilities Operational Readiness Review and Readiness Assessments

  16. A computer-supported management of photographic documentation in plastic surgery - System development and its clinical application.

    Science.gov (United States)

    Korczak, Karol; Kasielska-Trojan, Anna; Niedźwiedziński, Marian; Antoszewski, Bogusław

    2017-07-01

    Photographic documentation is very important for plastic, reconstructive, and especially aesthetic surgery procedures. It can be used to improve patient care as well as to carry out scientific research. The results of our previous studies confirmed a strong demand for Information Technology (IT) systems dedicated to plastic surgery. Unfortunately, most of the solutions of this type are not suited to the actual needs. For this reason we decided to develop a reliable system for photographic documentation storage. The Plastic Reconstructive Esthetic Surgery Photo System (PRESsPhoto) was developed and finally deployed in the Plastic, Reconstructive and Aesthetic Surgery Clinic of the Medical University in Łódź (Poland). Preliminary single-center performance tests proved that the PRESsPhoto system is easy to use and provides, inter alia, rapid data search and data entry as well as data security. In the future the PRESsPhoto system should be able to cooperate with Hospital Information Systems (HIS). The process of development and deployment of the PRESsPhoto system is an example of good cooperation between health care providers and the informatics, which resulted in a system that meets the expectations of plastic surgeons. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. Safety assessment of primary system components at the USNRC

    Energy Technology Data Exchange (ETDEWEB)

    Serpan, C Z; Chen, C Y; Taboada, A

    1988-12-31

    This document deals with the safety assessment in nuclear reactor components at the USNRC. The USNRC regulations and requirements concerning nuclear reactor design and operations are presented, together with guides and standards which describe how the actions should be implemented. The safety assessment relies on fracture analysis and Non Destructive Examination (NDE). (TEC).

  18. Distributed road assessment system

    Science.gov (United States)

    Beer, N. Reginald; Paglieroni, David W

    2014-03-25

    A system that detects damage on or below the surface of a paved structure or pavement is provided. A distributed road assessment system includes road assessment pods and a road assessment server. Each road assessment pod includes a ground-penetrating radar antenna array and a detection system that detects road damage from the return signals as the vehicle on which the pod is mounted travels down a road. Each road assessment pod transmits to the road assessment server occurrence information describing each occurrence of road damage that is newly detected on a current scan of a road. The road assessment server maintains a road damage database of occurrence information describing the previously detected occurrences of road damage. After the road assessment server receives occurrence information for newly detected occurrences of road damage for a portion of a road, the road assessment server determines which newly detected occurrences correspond to which previously detected occurrences of road damage.

  19. Consolidated Cab Display (CCD) System, Project Planning Document (PPD),

    Science.gov (United States)

    1981-02-01

    1980 1981 I 2 3 4 5 6 7 8 9 10 1112 1 2 3 4 5 6 7 8 9 1011112 1 2 31 12. Software Documentation a. Overall Computer Program Description ( OCPD ) b...Approve OCPD c. Computer Program Functional Specifications (CPFS) d. Data Base Table Design Specification (DBTDS) e. Software Interface Control Document...Parts List Master Pattern and Plan View Reproducible Drawings Instruction Book Training Aids/Materials b. Software: OCPD CPFS SI CD PDS DBTDS SDD

  20. Clinical map document based on XML (cMDX): document architecture with mapping feature for reporting and analysing prostate cancer in radical prostatectomy specimens.

    Science.gov (United States)

    Eminaga, Okyaz; Hinkelammert, Reemt; Semjonow, Axel; Neumann, Joerg; Abbas, Mahmoud; Koepke, Thomas; Bettendorf, Olaf; Eltze, Elke; Dugas, Martin

    2010-11-15

    The pathology report of radical prostatectomy specimens plays an important role in clinical decisions and the prognostic evaluation in Prostate Cancer (PCa). The anatomical schema is a helpful tool to document PCa extension for clinical and research purposes. To achieve electronic documentation and analysis, an appropriate documentation model for anatomical schemas is needed. For this purpose we developed cMDX. The document architecture of cMDX was designed according to Open Packaging Conventions by separating the whole data into template data and patient data. Analogue custom XML elements were considered to harmonize the graphical representation (e.g. tumour extension) with the textual data (e.g. histological patterns). The graphical documentation was based on the four-layer visualization model that forms the interaction between different custom XML elements. Sensible personal data were encrypted with a 256-bit cryptographic algorithm to avoid misuse. In order to assess the clinical value, we retrospectively analysed the tumour extension in 255 patients after radical prostatectomy. The pathology report with cMDX can represent pathological findings of the prostate in schematic styles. Such reports can be integrated into the hospital information system. "cMDX" documents can be converted into different data formats like text, graphics and PDF. Supplementary tools like cMDX Editor and an analyser tool were implemented. The graphical analysis of 255 prostatectomy specimens showed that PCa were mostly localized in the peripheral zone (Mean: 73% ± 25). 54% of PCa showed a multifocal growth pattern. cMDX can be used for routine histopathological reporting of radical prostatectomy specimens and provide data for scientific analysis.

  1. Risk management measures for chemicals in consumer products: documentation, assessment, and communication across the supply chain.

    Science.gov (United States)

    Bruinen de Bruin, Yuri; Hakkinen, Pertti Bert; Lahaniatis, Majlinda; Papameletiou, Demosthenes; Del Pozo, Carlos; Reina, Vittorio; Van Engelen, Jacqueline; Heinemeyer, Gerhard; Viso, Anne Catherine; Rodriguez, Carlos; Jantunen, Matti

    2007-12-01

    This paper analyzes the way risk management measures (RMMs) for consumer products have been used to date in authority and industry risk assessments. A working concept for consumer product RMMs is developed, aimed at controlling, limiting or avoiding exposures, and helping to insure the safe use (or handling) of a substance as part of a consumer product. Particular focus is placed on new requirements introduced by REACH (registration, evaluation, and authorization of chemicals). A RMMs categorization approach is also developed, dividing consumer product RMMs into those that are product integrated and those that are communicated to consumers. For each of these categories, RMMs for normal use, accidental use or misuse need to be distinguished. The level of detail for documenting, assessing and communicating RMMs across supply chains can vary, depending on the type of the assessment (tiered approach). Information on RMMs was collected from published sources to demonstrate that a taxonomical approach using standard descriptors for RMMs libraries is needed for effective information exchange across supply chains.

  2. Nuclear plant service water system aging degradation assessment: Phase 1

    International Nuclear Information System (INIS)

    Jarrell, D.B.; Johnson, A.B. Jr.; Zimmerman, P.W.; Gore, M.L.

    1989-06-01

    The initial phase of an aging assessment of nuclear power plant service water systems (SWSs) was performed by the Pacific Northwest Laboratory to support the Nuclear Regulatory Commission Nuclear Plant Aging Research (NPAR) program. The SWS was selected for study because of its essential role in the mitigation of and recovery from accident scenarios involving the potential for core-melt. The objectives of the SWS task under the NPAR program are to identify and characterize the principal aging degradation mechanisms relevant to this system and assess their impact on operational readiness, and to provide a methodology for the mitigation of aging on the service water aspect of nuclear plant safety. The first two of these objectives have been met and are covered in this Phase 1 report. A review of available literature and data-base information indicated that motor operated valve torque switches (an electro-mechanical device) were the prime suspect in component service water systems failures. More extensive and detailed data obtained from cooperating utility maintenance records and personnel accounts contradicted this conclusion indicating that biologic and inorganic accumulation and corrosive attack of service water on component surfaces were, in fact, the primary degradation mechanisms. A review of the development of time dependent risk assessment (aging) models shows that, as yet, this methodology has not been developed to a degree where implementation is reliable. Improvements in the accuracy of failure data documentation and time dependent risk analysis methodology should yield significant gains in relating aging phenomena to probabilistic risk assessment. 23 refs., 8 figs., 10 tabs

  3. Pairwise Trajectory Management (PTM): Concept Description and Documentation

    Science.gov (United States)

    Jones, Kenneth M.; Graff, Thomas J.; Carreno, Victor; Chartrand, Ryan C.; Kibler, Jennifer L.

    2018-01-01

    Pairwise Trajectory Management (PTM) is an Interval Management (IM) concept that utilizes airborne and ground-based capabilities to enable the implementation of airborne pairwise spacing capabilities in oceanic regions. The goal of PTM is to use airborne surveillance and tools to manage an "at or greater than" inter-aircraft spacing. Due to the accuracy of Automatic Dependent Surveillance-Broadcast (ADS-B) information and the use of airborne spacing guidance, the minimum PTM spacing distance will be less than distances a controller can support with current automation systems that support oceanic operations. Ground tools assist the controller in evaluating the traffic picture and determining appropriate PTM clearances to be issued. Avionics systems provide guidance information that allows the flight crew to conform to the PTM clearance issued by the controller. The combination of a reduced minimum distance and airborne spacing management will increase the capacity and efficiency of aircraft operations at a given altitude or volume of airspace. This document provides an overview of the proposed application, a description of several key scenarios, a high level discussion of expected air and ground equipment and procedure changes, a description of a NASA human-machine interface (HMI) prototype for the flight crew that would support PTM operations, and initial benefits analysis results. Additionally, included as appendices, are the following documents: the PTM Operational Services and Environment Definition (OSED) document and a companion "Future Considerations for the Pairwise Trajectory Management (PTM) Concept: Potential Future Updates for the PTM OSED" paper, a detailed description of the PTM algorithm and PTM Limit Mach rules, initial PTM safety requirements and safety assessment documents, a detailed description of the design, development, and initial evaluations of the proposed flight crew HMI, an overview of the methodology and results of PTM pilot training

  4. Safety assessment of emergency power systems for nuclear power plants

    International Nuclear Information System (INIS)

    1992-01-01

    This publication is intended to assist the safety assessor within a regulatory body, or one working as a consultant, in assessing the safety of a given design of the emergency power systems (EPS) for a nuclear power plant. The present publication refers closely to the NUSS Safety Guide 50-SG-D7 (Rev. 1), Emergency Power Systems at Nuclear Power Plants. It covers therefore exactly the same technical subject as that Safety Guide. In view of its objective, however, it attempts to help in the evaluation of possible technical solutions which are intended to fulfill the safety requirements. Section 2 clarifies the scope further by giving an outline of the assessment steps in the licensing process. After a general outline of the assessment process in relation to the licensing of a nuclear power plant, the publication is divided into two parts. First, all safety issues are presented in the form of questions that have to be answered in order for the assessor to be confident of a safe design. The second part presents the same topics in tabulated form, listing the required documentation which the assessor has to consult and those international and national technical standards pertinent to the topics. An extensive reference list provides information on standards. 1 tab

  5. Computer Support for Document Management in the Danish Central Government

    DEFF Research Database (Denmark)

    Hertzum, Morten

    1995-01-01

    Document management systems are generally assumed to hold a potential for delegating the recording and retrieval of documents to professionals such as civil servants and for supporting the coordination and control of work, so-called workflow management. This study investigates the use and organiz......Document management systems are generally assumed to hold a potential for delegating the recording and retrieval of documents to professionals such as civil servants and for supporting the coordination and control of work, so-called workflow management. This study investigates the use...... and organizational impact of document management systems in the Danish central government. The currently used systems unfold around the recording of incoming and outgoing paper mail and have typically not been accompanied by organizational changes. Rather, document management tends to remain an appendix...... to the primary work and be delegated to a specialized organizational unit. Several factors contribute to the present document management practices, for example it takes an extraordinary effort to achieve the benefits, and few institutions are forced to pursue them. Furthermore, document and workflow management...

  6. Documenting Evidence of Practice: The Power of Formative Assessment

    Science.gov (United States)

    Stefl-Mabry, Joette

    2018-01-01

    The field of school librarianship has long called for stronger evidence related to school libraries and student achievement (Stefl-Mabry and Raddick 2017; Stefl-Mabry et al. 2016; Morris and Cahill 2017). This article outlines a systematic method for school librarians to document student learning and provide tangible confirmation of their…

  7. Total system performance assessment - 1995: An evaluation of the potential Yucca Mountain Repository

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The U.S. Department of Energy (DOE) is currently investigating the feasibility of permanently disposing the nation`s commercial high-level radioactive wastes (in the form of spent fuel from the over 100 electric power-generating nuclear reactors across the U.S.) and a portion of the defense high-level radioactive wastes (currently stored at federal facilities around the country) in the unsaturated tuffaceous rocks at Yucca Mountain, Nevada. Quantitative predictions based on the most current understanding of the processes and parameters potentially affecting the long-term behavior of the disposal system are used to assess the ability of the site and its associated engineered designs to meet regulatory objectives set forward by the U.S. Nuclear Regulatory Commission (NRC) and the U.S. Environmental Protection Agency (EPA). The evaluation of the ability of the overall system to meet the performance objectives specified in the applicable regulatory standards has been termed total system performance assessment (TSPA). The aim of any total system performance assessment is to be as complete and reasonably conservative as possible and to assure that the descriptions of the predictive models and parameters are sufficient to ascertain their accuracy. Total system performance assessments evolve with time. As additional site and design information is generated, performance assessment analyses can be revised to become more representative of the expected conditions and remove some of the conservative assumptions necessitated by the incompleteness of site and design data. Previous iterations of total system performance assessment of the Yucca Mountain site and associated engineered barriers have been conducted in 1991 and 1993. These analyses have been documented in Barnard, Eslinger, Wilson and Andrews.

  8. Total system performance assessment - 1995: An evaluation of the potential Yucca Mountain Repository

    International Nuclear Information System (INIS)

    1995-11-01

    The U.S. Department of Energy (DOE) is currently investigating the feasibility of permanently disposing the nation's commercial high-level radioactive wastes (in the form of spent fuel from the over 100 electric power-generating nuclear reactors across the U.S.) and a portion of the defense high-level radioactive wastes (currently stored at federal facilities around the country) in the unsaturated tuffaceous rocks at Yucca Mountain, Nevada. Quantitative predictions based on the most current understanding of the processes and parameters potentially affecting the long-term behavior of the disposal system are used to assess the ability of the site and its associated engineered designs to meet regulatory objectives set forward by the U.S. Nuclear Regulatory Commission (NRC) and the U.S. Environmental Protection Agency (EPA). The evaluation of the ability of the overall system to meet the performance objectives specified in the applicable regulatory standards has been termed total system performance assessment (TSPA). The aim of any total system performance assessment is to be as complete and reasonably conservative as possible and to assure that the descriptions of the predictive models and parameters are sufficient to ascertain their accuracy. Total system performance assessments evolve with time. As additional site and design information is generated, performance assessment analyses can be revised to become more representative of the expected conditions and remove some of the conservative assumptions necessitated by the incompleteness of site and design data. Previous iterations of total system performance assessment of the Yucca Mountain site and associated engineered barriers have been conducted in 1991 and 1993. These analyses have been documented in Barnard, Eslinger, Wilson and Andrews

  9. Enhancing multi-document summarization using concepts

    Indian Academy of Sciences (India)

    Pattabhi R K Rao

    2018-03-10

    Mar 10, 2018 ... In this paper we propose a methodology to mine concepts from documents and use these concepts to generate an .... multi-document summarization system that uses sentence clustering. .... Examples: 'smart phone', 'running water'. Figure 1. .... cesses input, and begins by making stochastic decisions.

  10. Special report writer: A flexible information management system. Documentation and user's manual

    Science.gov (United States)

    Greene, W. A.

    1976-01-01

    A special report writer (SSR) was developed which performs multiple correlations on files containing several data hierarchies. Output reports are specified in a simple notation, readily learned by persons having limited familarity with ADP. The SRR system can be adopted by other NASA installations while the basic techniques themselves are compatible with the information management needs of a wide range of organizations. Specifically, the program lends itself to generalization and can be readily adapted for other file management purposes. Extensive details on the characteristics of the SRR program are presented along with a full explanation of the system for those contemplating its application to other data bases. The complete COBOL program and documentation are available.

  11. Every document and picture tells a story: using internal corporate document reviews, semiotics, and content analysis to assess tobacco advertising.

    Science.gov (United States)

    Anderson, S J; Dewhirst, T; Ling, P M

    2006-06-01

    In this article we present communication theory as a conceptual framework for conducting documents research on tobacco advertising strategies, and we discuss two methods for analysing advertisements: semiotics and content analysis. We provide concrete examples of how we have used tobacco industry documents archives and tobacco advertisement collections iteratively in our research to yield a synergistic analysis of these two complementary data sources. Tobacco promotion researchers should consider adopting these theoretical and methodological approaches.

  12. Technical document characterization by data analysis

    International Nuclear Information System (INIS)

    Mauget, A.

    1993-05-01

    Nuclear power plants possess documents analyzing all the plant systems, which represents a vast quantity of paper. Analysis of textual data can enable a document to be classified by grouping the texts containing the same words. These methods are used on system manuals for feasibility studies. The system manual is then analyzed by LEXTER and the terms it has selected are examined. We first classify according to style (sentences containing general words, technical sentences, etc.), and then according to terms. However, it will not be possible to continue in this fashion for the 100 system manuals existing, because of lack of sufficient storage capacity. Another solution is being developed. (author)

  13. DOCUMENT MANAGEMENT SYSTEMS AS A TOOL WHICH IMPROVE ADMINISTRATIVE PROCEDURES OF THE LOCAL GOVERNMENT UNITS

    Directory of Open Access Journals (Sweden)

    Katarzyna MARCINIAK

    2013-10-01

    Full Text Available This paper presents the overview of the costs incurred by the traditional record‐keeping. This was followed by characteristics of document management systems. It also presents the current state of implementation of such systems and presents the benefits of their implementation. Presented tool seems to be a good alternative that meets the expectations of both – clerks and applicants. The paper describes essential characteristics of such systems. There are also important aspects, that have to be considered before the implementation of this type of system.

  14. EFSA Guidance Document on the risk assessment of plant protection products on bees (Apis mellifera, Bombus spp. and solitary bees)

    NARCIS (Netherlands)

    Arnold, G.; Boesten, J.J.T.I.; Clook, M.

    2013-01-01

    The Guidance Document is intended to provide guidance for notifiers and authorities in the context of the review of plant protection products (PPPs) and their active substances under Regulation (EC) 1107/2009. The scientific opinion on the science behind the development of a risk assessment of plant

  15. SiGesDoC: The CIEMAT corporate document and records management system. A tool for managing, saving and disseminating knowledge

    International Nuclear Information System (INIS)

    Martin Santamaria, E.; Gonzalez Giralda, C.; Bustelo, C.; Gorostiza, C.

    2008-01-01

    The need to manage, save and disseminate technical scientific knowledge as part of the technology transfer process requires the implementation of Corporate Document and Records Management Systems that support a cultural change in the management of documentation generated in organizations as a result of their research work. In the CIEMAT, most knowledge is developed in R and D projects led by scientists and technologists and managed by the research support personnel and, therefore, it is very important to efficiently manage and control the life cycles of these projects. This article describes the implementation of a corporate document and records management system in the CIEMAT. (Author)

  16. A workshop on developing risk assessment methods for medical use of radioactive material. Volume 2: Supporting documents

    Energy Technology Data Exchange (ETDEWEB)

    Tortorelli, J.P. [ed.] [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States)

    1995-08-01

    A workshop was held at the Idaho National Engineering Laboratory, August 16--18, 1994 on the topic of risk assessment on medical devices that use radioactive isotopes. Its purpose was to review past efforts to develop a risk assessment methodology to evaluate these devices, and to develop a program plan and a scoping document for future methodology development. This report contains presentation material and a transcript of the workshop. Participants included experts in the fields of radiation oncology, medical physics, risk assessment, human-error analysis, and human factors. Staff from the US Nuclear Regulatory Commission (NRC) associated with the regulation of medical uses of radioactive materials and with research into risk-assessment methods participated in the workshop. The workshop participants concurred in NRC`s intended use of risk assessment as an important technology in the development of regulations for the medical use of radioactive material and encouraged the NRC to proceed rapidly with a pilot study. Specific recommendations are included in the executive summary and the body of this report.

  17. A workshop on developing risk assessment methods for medical use of radioactive material. Volume 2: Supporting documents

    International Nuclear Information System (INIS)

    Tortorelli, J.P.

    1995-08-01

    A workshop was held at the Idaho National Engineering Laboratory, August 16--18, 1994 on the topic of risk assessment on medical devices that use radioactive isotopes. Its purpose was to review past efforts to develop a risk assessment methodology to evaluate these devices, and to develop a program plan and a scoping document for future methodology development. This report contains presentation material and a transcript of the workshop. Participants included experts in the fields of radiation oncology, medical physics, risk assessment, human-error analysis, and human factors. Staff from the US Nuclear Regulatory Commission (NRC) associated with the regulation of medical uses of radioactive materials and with research into risk-assessment methods participated in the workshop. The workshop participants concurred in NRC's intended use of risk assessment as an important technology in the development of regulations for the medical use of radioactive material and encouraged the NRC to proceed rapidly with a pilot study. Specific recommendations are included in the executive summary and the body of this report

  18. Hybrid classification: the case of the acquisition procedure documentation within and ouside the Public Contracts information systems in Alto Adige Region

    Directory of Open Access Journals (Sweden)

    Francesca Delneri

    2017-05-01

    Full Text Available With reference to the acquisition procedures, the related documentation is created and managed mostly on the platform of the subcontracting institution, partly on the Alto Adige Public Sector Contracts information system. With a partial integration between this system and the platform made available by the Agenzia per i procedimenti e la vigilanza in materia di contratti pubblici di lavori, servizi e forniture, classification and filing information can be assigned to the documents coming from both platform, while the reunification of documents related to the same process is transferred to the preservation system as unique archive of the administration.

  19. 文件物件模型及其在XML文件處理之應用 Document Object Model and Its Application on XML Document Processing

    Directory of Open Access Journals (Sweden)

    Sinn-cheng Lin

    2001-06-01

    Full Text Available 無Document Object Model (DOM is an application-programming interface that can be applied to process XML documents. It defines the logical structure, the accessing interfaces and the operation methods for the document. In the DOM, an original document is mapped to a tree structure. Therefore ,the computer program can easily traverse the tree manipulate the nodes in the tree. In this paper, the fundamental models, definitions and specifications of DOM are surveyed. Then we create an experimenta1 system of DOM called XML On-Line Parser. The front-end of the system is built by the Web-based user interface for the XML document input and the parsed result output. On the other hand, the back-end of the system is built by an ASP program, which transforms the original document to DOM tree for document manipulation. This on-line system can be linked with a general-purpose web browser to check the well-formedness and the validity of the XML documents.

  20. Safety assessment of emergency electric power systems for nuclear power plants

    International Nuclear Information System (INIS)

    1986-09-01

    This paper is intended to assist the safety assessor within a regulatory body, or one working as a consultant, in assessing a given design of the Emergency Electrical Power System. Those non-electric power systems which may be used in a plant design to serve as emergency energy sources are addressed only in their general safety aspects. The paper thus relates closely to Safety Series 50-SG-D7 ''Emergency Power Systems at Nuclear Power Plants'' (1982), as far as it addresses emergency electric power systems. Several aspects are dealt with: the information the assessor may expect from the applicant to fulfill his task of safety review; the main questions the reviewer has to answer in order to determine the compliance with requirements of the NUSS documents; the national or international standards which give further guidance on a certain system or piece of equipment; comments and suggestions which may help to judge a variety of possible solutions