WorldWideScience

Sample records for susitna hydroelectric project

  1. 2011 Alaska Matanuska and Susitna Boroughs Lidar Point Clouds

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Matanuska Susitna Borough LiDAR/Imagery Project covers 3680 sq/mi of the Matanuska-Susitna Borough in Alaska. Project parnters and funding sources include:...

  2. Hiilangaay Hydroelectric Project – Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Twitchell, Sara [HDR, Omaha, NE (United States); Stimac, Michael [HDR, Omaha, NE (United States); Lang, Lisa [Haida Corporation, Hydaburg, AK (United States); Witwer, Doreen [Haida Corporation, Hydaburg, AK (United States); Jameson, Vincent [Haida Corporation, Hydaburg, AK (United States)

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

  3. Small-Scale Hydroelectric Power Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  4. Tuttle Creek Hydroelectric Project feasibility assessment report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-03-01

    The results are presented of a feasibility assessment study to determine if hydroelectric generation could be developed economically at the Corps of Engineers' Tuttle Creek Dam, an existing flood control structure on the Big Blue River near Manhattan, Kansas. The studies and investigations included site reconnaissance, system load characteristics, site hydrology, conceptual project arrangements and layouts, power studies, estimates of construction costs, development of capital costs, economic feasibility, development of a design and construction schedule and preliminary environmental review of the proposed Project. The dependable capacity of the Project as delivered into the existing transmission and distribution network is 12,290 kW and the average annual energy is 56,690 MWh. For the scheduled on-line date of July 1984, the Project is estimated to have a Total Investment Cost of $19,662,000 (equal to $1333/kW installed at that time frame) with an estimated annual cost for the first year of operation of $2,696,000, assuming REA financing at 9.5% interest rate. The Project is considered technically feasible and without any major environmental issues. It shows economic feasibility providing satisfactory financing terms are available. (LCL)

  5. Hoopa Valley Small Scale Hydroelectric Feasibility Project

    Energy Technology Data Exchange (ETDEWEB)

    Curtis Miller

    2009-03-22

    This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

  6. Hydroelectric project impacts on Stikine River ecosystems: An overview

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The report provides an overview on the hydroelectric project impacts on Stikine river ecosystems. The objective of this study was to develop a report which would aid...

  7. Systematic Sustainability Assessment (SSA) Tool for Hydroelectric Project in Malaysia

    Science.gov (United States)

    Turan, Faiz Mohd; Johan, Kartina

    2017-08-01

    Sustainably developed and managed hydropower has enormous potential to contribute to global sustainability goals. It is known that hydroelectricity contributing small amounts to greenhouse gas emissions and other atmospheric pollutants. However, developing the remaining hydroelectric potential offers many challenges, and public pressure and expectations on the environmental and social performance of hydroelectric tend to increase over time. This paper aims to develop Systematic Sustainability Assessment (SSA) Tool that promotes and guides more sustainable hydroelectric projects in the context of Malaysia. The proposed SSA tool which not only provide a quality and quantitative report of sustainability performance but also act as Self-Assessment Report (SAR) to provide roadmap to achieve greater level of sustainability in project management for continuous improvement. It is expected to provide a common language that allow government, civil society, financial institutions and the hydroelectric sector to talk about and evaluate sustainability issues. The advantage of SSA tool is it can be used at any stage of hydroelectric development, from the earliest planning stages right through to operation.

  8. 76 FR 22393 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation...

    Science.gov (United States)

    2011-04-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy... and Wildlife Service for the proposed Eagle Mountain Pumped Storage Hydroelectric Project. This...

  9. Legal factors affecting the financing of small scale hydroelectric projects

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, W.H.; Ringo, M.J.; Forgione, N.

    1983-09-01

    An introduction to the major business organizational options open to small-scale hydroelectric (SSH) projects is given. The major federal income tax treatments of these options are compared. Significant general federal income tax factors affecting SSH projects are reintroduced and explained. Some of the special federal income tax problem areas in SSH development are isolated. Tax benefit flow through or transfer mechanisms are discussed. Tax exempt financing opportunities for private SSH projects are reviewed. (MHR)

  10. Small-Scale Hydroelectric Power Demonstration Project. Pennsylvania Hydroelectric Development Corporation Flat Rock Dam: Project summary report

    Energy Technology Data Exchange (ETDEWEB)

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  11. Financing of private small scale hydroelectric projects

    Energy Technology Data Exchange (ETDEWEB)

    Smukler, L.M.

    1981-03-01

    This manual is a description of the financing process associated with the private development of SSH projects. It examines the institutional framework and the actors within that framework who will have vital impact upon the potential for success of a project. The manual describes the information a developer should obtain in order to make intelligent decisions concerning the multiple directions in which project development can proceed. This information should assist the developer in formulating a business plan. Factors to be considered in choosing a business organizational form are discussed. Included is an analysis of the federal income tax factors relevant to SSH in context of the treatment of specific items: business expenses, depreciation, the Investment Tax Credit, and the Energy Tax Credit as modified by COWPTA. In addition, the tax and organizational factors are applied to an analysis of two mechanisms which can lower development costs through maximum utilization of available tax benefits: limited partnerships and leveraged leases. The manual lists and analyzes the major sources of debt and equity financing that are potentially available to a developer. Finally, all the previously discussed pieces are put together and how the decisions relating to such factors as marketing, taxation and debt financing interrelate to determine the probable success and profitability of a project are investigated. Furthermore, this part of the manual will provide an illustrated guide to understanding the financing process, leading the reader through the decisionmaking and negotiation points, and highlighting what should be borne in mind, what a developer may be giving up and what the perspective of other key actors will be at those points.

  12. 77 FR 47628 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting...

    Science.gov (United States)

    2012-08-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project...

  13. 77 FR 43280 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2012-07-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy... Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All...

  14. 78 FR 26358 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-05-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy...), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal agencies...

  15. 78 FR 25263 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-04-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal...

  16. Stock participation in hydroelectric projects; Hacia una participacion accionaria en los proyectos hidroelectricos

    Energy Technology Data Exchange (ETDEWEB)

    Robinson, Scott S. [Universidad Metropolitana, Iztapalapa (Mexico). Dept. de Antropologia

    1996-12-31

    This work talks about the way the hydroelectric companies deal with the moving of people for reservoir construction. It happens trough an authoritarian way without a previous communication with the people that will be moved what make them resist. The proposal of author is make people that will be affected by the hydroelectric construction participate in the benefices it will generate. It happened in the construction of hydroelectric project in Pangue, Chile, with good results

  17. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    Taddeucci, Joe [Dept. of Public Works, Boulder, CO (United States). Utilities Division

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  18. Raptor observations associated with Terror Lake hydroelectric project: 1984 annual progress report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Raptors in the vicinity of the Terror Lake Hydroelectric Project (TLHP) were studied to determine the effects of project construction and operation on nesting and...

  19. Canton hydroelectric project: feasibility study. Final report, appendices

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)

  20. Raptor observations associated with Terror Lake Hydroelectric Project: 1983 annual progress report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The report discusses the modification to both bald eagles and rough-legged hawk nesting behavior seen in the Terror Lake Hydroelectric Project area during 1983. A...

  1. 77 FR 21556 - Don Pedro Hydroelectric Project: Turlock Irrigation District; Modesto Irrigation District...

    Science.gov (United States)

    2012-04-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Don Pedro Hydroelectric Project: Turlock Irrigation District; Modesto Irrigation District; Supplement to Notice of Study Dispute Resolution Technical Conference On March 16, 2012...

  2. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  3. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  4. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  5. Sediment management of run-of-river hydroelectric power project in ...

    Indian Academy of Sciences (India)

    Neena Isaac

    management. This paper presents the drawdown flushing studies of the reservoir of a Himalayan River. Hydroelectric Project called Kotlibhel in Uttarakhand, India. For the ... The model studies show that the sedimentation problem of the reservoir can be ..... [6] Yoon Y N 1992 The state and the perspective of the direct.

  6. 76 FR 15971 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Teleconference

    Science.gov (United States)

    2011-03-22

    ... Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Eagle Crest Energy as part of its on-going Section 7 Endangered Species Act consultation efforts. e. All... Eagle Crest Energy, via e-mail at: [email protected] ; or via telephone at: 503-697-1478. All...

  7. 76 FR 22699 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Teleconference

    Science.gov (United States)

    2011-04-22

    ... Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy... Eagle Crest Energy as part of its on-going Section 7 Endangered Species Act consultation efforts. e. All... Eagle Crest Energy, via e-mail at: [email protected] ; or via telephone at: 503-697-1478. All...

  8. The Victoria Project, Sri Lanka: Victoria Power-Station. [Hydroelectric power

    Energy Technology Data Exchange (ETDEWEB)

    Creber, B. (Sir Alexander Gibb and Partners (GB))

    1991-04-01

    The Victoria Hydroelectric Power-Station forms part of the Victoria Project on the Mahaweli Ganga in Sri Lanka and it provides the country's largest single power source. The Paper describes the planning, design and construction of the civil engineering works, including problems encountered, and also describes, in outline, the electrical and mechanical works. (Author).

  9. 75 FR 73059 - Record of Decision and Floodplain Statement of Findings for the Cushman Hydroelectric Project...

    Science.gov (United States)

    2010-11-29

    ... increase the quantity, value, and environmental performance of hydropower generation. Because the funds are... the Cushman Hydroelectric Project, Mason County, Washington, Environmental Impact Statement (DOE/EIS... environmental impacts from the proposed action were analyzed in the Federal Energy Regulatory Commission's (FERC...

  10. Legal obstacles and incentives to the development of small scale hydroelectric projects in Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small scale hydroelectric energy at the state level are discussed. The discussion is designed to aid the developer in the determination of which permits, licenses, and laws of the state must be secured or complied with for the development of a project. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Specific sections that follow are: Massachusetts Water Law; Licensing, Permitting, and Review Procedures; Indirect Considerations (by departments); Department of Public Utilities Regulation of Privately Owned Electric Utilities; Massachusetts Municipal Wholesale Electric Company; Miscellaneous Legal Issues Relating to Low-Head Hydroelectric Power; and Financial Considerations.

  11. landslide hazard zonation around gilgel gibe-ii hydroelectric project

    African Journals Online (AJOL)

    Preferred Customer

    few isolated pockets of flat land are present near. Fofa town which is being utilized for house construction (Fig. 6). Most of the agricultural plots in the area are on the moderately steep slopes and rarely in the steep ones. There are few isolated clusters of dense forest covers in the project area. The vegetation cover along the ...

  12. Manual for development of small scale hydroelectric projects by public entities

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    This manual is designed to provide guidance to towns, cities, counties and other political subdivisions which are interested in undertaking or participating in small scale hydroelectric (SSH) development within or close to their territorial boundaries. The manual is primarily directed to those political subdivisions which either own or have access to a site, are interested in exploring the prospects for development of the site and do not have longstanding experience in the electric power development. For purposes of this manual a small scale hydroelectric project is a project of 25 to 30 MWs or less and utilizes an existing dam or structure or utilizes the site characteristics of partially breached dams or structures. As the reader will observe from the discussion that follows, several incentives under federal and state law have been implemented which favor small scale hydroelectric development at existing sites. This manual is designed to assist political subdivisions in taking advantage of these incentives and devising strategies for development. The manual will provide information to political subdivisions as to what to expect in the development process and the kinds of informed questions to ask of paid advisers. The manual, however, cannot be and should not be used as a substitute for competent advice and assistance from experienced lawyers, engineers, accountants and financing experts.

  13. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  14. Environmental Impact Assessment: Uri hydroelectric power project on River Jhelum in Kashmir, India

    Energy Technology Data Exchange (ETDEWEB)

    Nyman, L.

    1995-09-01

    This report is an Initial Aquatic Environmental Impact Assessment of the Uri Hydroelectric Power Project on River Jhelum in Kashmir, India. It includes the Terms of Reference of the assessment, a discussion on biodiversity and threats to it, the environmental indicators used to monitor and predict the impacts, a description of the physical, chemical and biological prerequisites of the River Jhelum ecosystem, a description of the survey sites chosen, and an overview of the present fish and bottom fauna. Finally, there are sections on the potential impacts on biota of the Uri Project and a list of proposals for how mitigating and enhancing measures could be enforced

  15. Tazimina Hydroelectric Project, Iliamna, Alaska Final Technical and Construction Cost Report

    Energy Technology Data Exchange (ETDEWEB)

    HDR Alaska, Inc.

    1998-11-01

    The Iliamna-Newhalen-Nondalton Electric Cooperative (INNEC) provides electrical power to three communities of the same names. These communities are located near the north shore of Iliamna Lake in south-central Alaska approximately 175 miles southwest of Anchorage. These communities have a combined population of approximately 600 residents. There is no direct road connection from these villages to larger population centers. Electric power has been generated by INNEC since 1983 using diesel generators located in the community of Newhalen. Fuel for these generators was transported up the Kvichak River, an important salmon river, and across Iliamna Lake. In dry years the river is low and fuel is flown into Iliamna and then trucked five miles into Newhalen. The cost, difficult logistics and potential spill hazard of this fuel was a primary reason for development of hydroelectric power in this area. A hydroelectric project was constructed for these communities, starting in the spring of 1996 and ending in the spring of 1998. The project site is at Tazimina Falls about 9 miles upstream of the confluence of the Tazimina River and the Newhalen River. The project has an installed capacity of 824 kilowatts (kW) and is expandable to 1.5 megawatts (MW). The project is run-of-the-river (no storage) and uses the approximately 100 feet of natural head provided by the falls. The project features include a channel control sill, intake structure, penstock, underground powerhouse, tailrace, surface control building, buried transmission line and communication cable, and access road.

  16. Management Strategy for Hydroelectric Project Toro 2: Knowing and enhancing natural resources sustainably

    Directory of Open Access Journals (Sweden)

    José Pereira Chaves

    2014-01-01

    Full Text Available The aim of this article is to understand and sustainably enhance the biological and ecological resources of the Hydroelectric Project of Toro 2, thus; a research was carried out to inventory the presence of birds, mammals and plants, in order to know if the site qualifies as a biological tourist attraction, as well as to know the opinion of local people. It is proposed the sustainable uses of natural resources, through a strategy of use, management and conservation of the ecosystems.

  17. Standardization of electric projects of small hydroelectric power plants; Padronizacao de projetos eletricos de pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Roberth dos Santos

    2002-07-01

    This work presents a standardizing proposal for Electrical Projects of small hydroelectric central and it has as objective to optimize some solutions for the most cases, considering the great diversity of options. The development of the dissertation is the result of several real cases of projects of hydroelectric centrals. Besides the projects, several bibliographies about the case which is being studied were researched, taking into consideration the entire proposal presented to the respective authors and, finally, as synthesis to all observations made in that study, the presentation of an optimized solution for the job of the electrical components and a proposal for the estimate of costs of those components. The conclusions of this work present a favorable result because they offer an initial proposal for the standardizing of information considered extremely important for the carrying out of a project of hydroelectric central. (author)

  18. Tazimina hydroelectric project, Iliamna, Alaska. Final technical and construction cost report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    The Iliamna-Newhalen-Nondalton Electric Cooperative (INNEC) provides electrical power to three communities of the same names. These communities are located near the north shore of Iliamna Lake in south-central Alaska approximately 175 miles southwest of Anchorage. A hydroelectric project was constructed for these communities, starting in the spring of 1996 and ending in the spring of 1998. The project site is on the Tazimina River about 12 miles northeast of Iliamna Lake. The taximina River flows west from the Aleutian Range. The project site is at Tazimina Falls about 9 miles upstream of the confluence of the Tazimina River and the Newhalen River. The project has an installed capacity of 824 kilowatts (kW) and is expandable to 1.5 megawatts (MW). The project is run-of-the-river (no storage) and uses the approximately 100 feet of natural head provided by the falls. The project features include a channel control sill, intake structure, penstock, underground powerhouse, tailrace, surface control building, buried transmission line and communication cable, and access road.

  19. 76 FR 25307 - Incidental Take Permit and Habitat Conservation Plan for PacifiCorp Klamath Hydroelectric Project...

    Science.gov (United States)

    2011-05-04

    ... Conservation Plan for PacifiCorp Klamath Hydroelectric Project Interim Operations AGENCY: National Marine... part of the application. The application and Plan address potential incidental take of one ESA-listed... received by 5 p.m. Pacific Time, on July 5, 2011. ADDRESSES: Written comments concerning the draft EA, Plan...

  20. 77 FR 14734 - Incidental Take Permit and Habitat Conservation Plan for PacifiCorp Klamath Hydroelectric Project...

    Science.gov (United States)

    2012-03-13

    ... Incidental Take Permit (ITP) and Habitat Conservation Plan (HCP) for take of a threatened species in... reduce the likelihood of the survival and recovery of the species in the wild; and (5) the applicant will... Conservation Plan for PacifiCorp Klamath Hydroelectric Project Interim Operations AGENCY: National Marine...

  1. 75 FR 9201 - Kilarc-Cow Creek Hydroelectric Project; Notice of Intention To Prepare an Environmental Impact...

    Science.gov (United States)

    2010-03-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kilarc-Cow Creek Hydroelectric Project; Notice of Intention To Prepare an Environmental Impact Statement February 19, 2010. The Federal Energy Regulatory Commission (FERC) has received...

  2. The further environmental development of Polyphyto Hydroelectric Project reservoir in Kozani prefecture and its contribution to the life quality improvement

    Science.gov (United States)

    Saounatsou, Chara; Georgi, Julia

    2014-08-01

    The Polyphyto Hydroelectric Project was constructed in 1974 and it has been operating since on the Aliakmonas River, Kozani prefecture, by the Greek Public Power Corporation. The construction of the Ilarion Hydroelectric Project, upstream from the Polyphyto Reservoir, has been recently completed and will start operating in the near future. Apart from hydroelectric power production, the Polyphyto reservoir provides flood control to the areas below the Polyphyto dam. It is also used to manage water provision to the city of Thessaloniki and adjacent agricultural plain, providing at the same time cooling water to the Thermo Electric Projects in Ptolemaida. The Polyphyto reservoir has potential for further development as an economic fulcrum to the region in which is located. The Kozani and Servia-Velvendos Municipalities have proceeded to the construction of several touristic, nautical - athletic and fishing projects. In order to promote such developments, while preserving the artificial wetland, flora and fauna of the Polyphyto Reservoir, it is important to reduce the fluctuation of the reservoir elevation which according to its technical characteristics is 21m. The aim of this paper is to propose the combined operation of the two Hydroelectric Project reservoirs to satisfy all the present Polyphyto Hydroelectric Project functions and to reduce the annual fluctuation of the Polyphyto Reservoir. The HEC-5, Version 8 / 1998 computer model was used in our calculations, as developed by the Hydrologic Engineering Center (HEC) of the US Army Corps of Engineers for reservoir operation simulation. Five possible operation scenarios are tested in this paper to show that the present fluctuation of the Polyphyto Reservoir can be reduced, with some limitations, except during dry weather periods.

  3. Status Review of Wildlife Mitigation at Columbia Basin Hydroelectric Projects, Oregon Facilities, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bedrossian, Karen L.

    1984-08-01

    The report presents a review and documentation of existing information on wildlife resources at Columbia River Basin hydroelectric facilities within Oregon. Effects of hydroelectric development and operation; existing agreements; and past, current and proposed wildlife mitigation, enhancement, and protection activities were considered. (ACR)

  4. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  5. The wildlife research & rescue programme for mammals at Hulu Terengganu Hydroelectric Project (HTHEP), Terengganu, Peninsular Malaysia

    Science.gov (United States)

    Nur-Syuhada, N.; Magintan, D.; Siti-Hajar, A. R.; Aisah, M. S.; Shukor, M. N.

    2016-11-01

    During the inundation of the Hulu Terengganu Hydroelectric Project in October 2014, a wildlife rescue programme was conducted to rescue animals found trapped within the expanding 61.6 km2 reservoir. A total of 244 mammals from 30 species, representing 12 families were rescued by various methods included baited live trapping, catchpoles, hoop nets and by hand. The order Rodentia recorded the highest amount of rescued individuals at 20.9%, followed by Primate (18.9), Dermoptera (11.1), Carnivora (0.8) and Pholidota (0.4). The genus Rattus recorded the highest individuals rescued (51 individuals) probably due to the rapid clear-cut logging of the forest prior to inundation. Notable mammals of high conservational value rescued included Manis javanicus (Pangolin), Presbytis melalophos siamensis (Mitred Leaf Monkey), Trachypithecus obscurus (Dusky Leaf Monkey), Hylobates lar (White Handed Gibbon), Nycticebus coucang (Slow Loris), Galeopterus variegatus (Sunda Colugo), Callosciurus nigrovittatus (Sunda Black-banded Squirrel), Ratufa spp. (Giant Squirrels), and Sundasciurus hippurus (Horse-tailed Squirrel). Various data and biological samples were collected from the mammals rescued prior to their release at the nearest forest reserves. Rescue operation enabled the inventory and comprehensive data collection of various arboreal and rare mammal species that are hard to capture using the traditional survey method.

  6. Manitoba Hydro's Aboriginal partnerships : a new business model for developing current and future hydro-electric projects

    Energy Technology Data Exchange (ETDEWEB)

    Pachal, S.; Goulet, R. [Manitoba Hydro, Winnipeg, MB (Canada)

    2008-07-01

    Socio-economic as well as environmental considerations have become as important as economic factors when developing hydroelectric power projects. Manitoba Hydro has developed a unique partnership approach to deal more effectively and equitably with the Aboriginal communities of Northern Manitoba who live in proximity to, and are affected by, projects such as the construction of the Wuskwatim3, the Keeyask4 and Conawapa5 generating stations. This paper outlined the genesis of Manitoba Hydro's approach along with the main elements and the expected benefits to both Manitoba Hydro and its partners. Their past approach in dealing with the communities who were in the vicinity of hydro-electric projects was also discussed. Manitoba Hydro's new approach includes the provision of training, employment and business opportunities as well as the possibility of ownership in the project. It is not without challenges, as it increases the costs, adds complexity and slows down the planning process. It also requires much consultation and patience to reconcile different goals and priorities regarding the development of these projects. It can also increase the risks involved by increasing construction or operating costs and even impair the viability of projects. Despite the challenges inherent in such partnerships, Manitoba Hydro sees immediate and long-lasting benefits for itself and the communities involved. 16 refs.

  7. Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-03-01

    The feasibility of constructing a low-head hydroelectric power plant at the North Hartland Dam in Vermont was investigated. Evaluation of technical, economic, environmental, safety, and regulatory aspects led to the conclusion that the North Hartland Dam Hydroelectric Project is a technically feasible concept. The proposed project will have a recommended 6000 kW nominally rated capacity at a 52 ft turbine design head and 1680 cfs demand flow. The gross generation expected from the project is 11,980,000 kWh per year. It is estimated that the project will cost $8,997,000 at 1978 price levels, with no allowance for funds during construction. The project will provide peaking power at a levelized cost of about 41 mills per kWh at 1979 price levels, based on 7% cost of money, a 1985 commissioning date, and allowing for funds during construction and cost escalation over a 30 y period. The benefit-cost ratio compared with an equivalent oil-based generation source over a similar period is estimated as 1.06. (LCL)

  8. Reconnaissance coal study in the Susitna basin, 2014

    Science.gov (United States)

    David L. LePain,; Stanley, Richard G.; Harun, Nina T.; Helmold, Kenneth T.; Tsigonis, Rebekah

    2015-01-01

    The Alaska Division of Geological & Geophysical Surveys (DGGS) conducted fieldwork during the summer of 2014 in the Susitna basin as part of an ongoing evaluation of the hydrocarbon potential of frontier basins, particularly those near the Railbelt region (for example, Decker and others, 2013; Gillis and others, 2013). Topical studies associated with this recent work include sedimentary facies analysis (LePain and others, 2015) and structural geology investigations (Gillis and others, 2015). The Susitna basin contains coal-bearing Paleogene and Neogene strata correlative with formations that host oil and gas in Cook Inlet basin to its south. Isotopic signatures of natural gas reservoired in the Miocene/Pliocene Sterling and Miocene Beluga Formations suggest a biogenic origin for Cook Inlet gas (Claypool and others, 1980). To assess the biogenic gas potential of the Susitna basin, it is important to obtain information from its coal-bearing units.Characteristics of coal, such as maturity/rank and cleat development are key parameters influencing viability of a biogenic gas system (Laubach and others, 1998). In an early study of the Susitna basin (Beluga–Yentna region), Barnes (1966) identified, analyzed, and recognized potentially valuable subbituminous coal resources at Fairview Mountain, Canyon Creek, and Johnson Creek. Merritt (1990), in a sedimentological study to evaluate surface coal mining potential of the Tertiary rocks of the Susitna basin (Susitna lowland), concluded that the basin contained several billion tons of mineable reserves. This preliminary report offers a brief summary of new information on coals in the Susitna Basin acquired during associated stratigraphic studies (see LePain and others, 2015). 

  9. Ashlu Creek hydroelectric project: Design and optimization of hydraulic structures under construction using 2D and 3D numerical modeling

    Energy Technology Data Exchange (ETDEWEB)

    Briand, Marie-Helene; Tremblay, Catherine; Bosse, Yannick; Gacek, Julian; Alfaro, Carola [RSW Inc., (Canada); Blanchet, Richard [Innergex Renewable Energy, Vancouver, (Canada)

    2010-07-01

    A hydroelectric project located on Ashlu Creek, halfway between Whistler and Vancouver in British Columbia, consisted of a run-of-river project that used a short stretch of steep rapids to generate a capacity of 49.9MW. This paper presented the design and the optimization of the hydraulic structures during the construction phases using 2-D and 3-D numerical modelling. The proposed works included an emergency spillway weir equipped with an Obermeyer gate, a rock-fill weir, a Denil type fish ladder, a sluiceway and a side intake. The design and the verification of the upstream works were carried out using these models. The hydraulic conditions during construction phases were also simulated using the models in order to estimate the impact of the operations and validate the diversion works. It was found that numerical modeling can be an efficient alternative to small-scale physical modeling for specific applications in designing hydraulic structures.

  10. Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The technical and economic feasibility of low head hydroelectric power development at existing sites along the Mousam River in southeastern Maine was studied. The following areas were investigated: determination of available energy; development of restoration concepts; environmental studies; historical and archeological studies; assessment of civil construction requirements; geotechnical and geologic assessment of existing dams; assessment of turbine alternatives; assessment of generator and utility interface alternatives; economic analysis; and restoration concept evaluation and selection. The results of the hydropower evaluation showed that: of the seven sites evaluated, only four can be considered economically feasible for refurbishment at this time; the use of used and/or rebuilt equipment is more economically attractive than new equipment; the cost of equipment at each site was of the same order as the cost of the dam reconstruction; and the cost of fuel prices will be the determining feature of whether the sites should be reconstructed.

  11. Development of Newfoundland Power`s Rose Blanche hydroelectric power project

    Energy Technology Data Exchange (ETDEWEB)

    Hunter, M.C.

    1999-08-01

    The 6.0 Mw Rose Blanche hydroelectric development is located on the southwest portion of the island of Newfoundland. This is the first new development by Newfoundland Power since 1983 and was a learning experience because of changes in regulatory requirements, available technologies and the working relationships between suppliers and contractors. Environmental issues dealt with included a five year assessment process, fisheries compensation/enhancement, minimum streamflow requirements, and construction and emergency preparedness plans. Technical issues included the use of spiral welded steel penstock, design and construction of an earthfill concrete face dam, and turbine generator design and control systems. There was a necessity to build the plant in one construction season and the plant was synchronized to the system in December 1998. The approach taken by the design and construction team was cooperative as they worked together with suppliers and contractors to develop the most expedient and cost effective methods of construction.

  12. Risk factors for the presence of Aedes aegypti and Aedes albopictus in domestic water-holding containers in areas impacted by the Nam Theun 2 hydroelectric project, Laos

    NARCIS (Netherlands)

    Hiscox, A.F.; Kaye, A.; Vongphayloth, K.; Banks, I.; Piffer, M.; Khammanithong, P.; Sananikhom, P.; Kaul, S.; Hill, N.; Lindsay, S.W.; Brey, P.T.

    2013-01-01

    We assessed risk factors for vectors of dengue and chikungunya viruses near a new hydroelectric project, Nam Theun 2, in Laos. Immature stages of Aedes aegypti were found only in sites within 40 km of the urban provincial capital, but Aedes albopictus was found throughout. Aedes aegypti pupae were

  13. South Fork Tolt River Hydroelectric Project : Adopted Portions of a 1987 Federal Energy Regulatory Commission`s Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-07-01

    The South Fork Tolt River Hydroelectric Project that world produce 6.55 average megawatts of firm energy per year and would be sited in the Snohomish River Basin, Washington, was evaluated by the Federal Energy Regulatory commission (FERC) along with six other proposed projects for environmental effects and economic feasibility Based on its economic analysis and environmental evaluation of the project, the FERC staff found that the South Fork Tolt River Project would be economically feasible and would result in insignificant Impacts if sedimentation issues could be resolved. Upon review, the BPA is adopting portions of the 1987 FERC FEIS that concern the South Fork Tolt River Hydroelectric Project and updating specific sections in an Attachment.

  14. Carbon stored in forest plantations of Pinus caribaea, Cupressus lusitanica and Eucalyptus deglupta in Cachí Hydroelectric Project

    Directory of Open Access Journals (Sweden)

    Marylin Rojas

    2014-06-01

    Full Text Available Forest plantations are considered the main carbon sinks thought to reduce the impact of climate change. Regarding many species, however, there is a lack of information in order to establish metrics on accumulation of biomass and carbon, principally due to the level of difficulty and the cost of quantification through direct measurement and destructive sampling. In this research, it was evaluated carbon stocks of forest plantations near the dam of hydroelectric project Cachí, which belongs to Instituto Costarricense de Electricidad. 25 unit samples were evaluated along some plantations that contain three different species. 30 Pinus caribacea trees, 14 Cupressus lusitanica and 15 Eucalyptus deglupta were extracted. The biomass was quantified by means of the destructive method. First of all, every component of the tree was weighed separately; then, sampling was obtained in order to determine the dry matter and the carbon fraction. 110 biomass samples from the three species were analyzed in laboratory, including all the components (leaves, branches, shaft, and root. The carbon fraction varied between 47,5 and 48,0 for Pinus caribacea; between 32,6 and 52,7 for Cupressus lusitanica, and beween 36,4 and 50,3% for Eucalyptus deglupta. The stored carbon was 230, 123, and 69 Mg ha-1 in plantations of P. caribaea, C. lusitanica and E. deglupta, respectively. Approximately, 75% of the stored carbon was detected in the shaft.

  15. Oregon Trust Agreement Planning Project : Potential Mitigations to the Impacts on Oregon Wildlife Resources Associated with Relevant Mainstem Columbia River and Willamette River Hydroelectric Projects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-10-01

    A coalition of the Oregon wildlife agencies and tribes (the Oregon Wildlife Mitigation Coalition) have forged a cooperative effort to promote wildlife mitigation from losses to Oregon wildlife resources associated with the four mainstream Columbia River and the eight Willamette River Basin hydroelectric projects. This coalition formed a Joint Advisory Committee, made up of technical representatives from all of the tribes and agencies, to develop this report. The goal was to create a list of potential mitigation opportunities by priority, and to attempt to determine the costs of mitigating the wildlife losses. The information and analysis was completed for all projects in Oregon, but was gathered separately for the Lower Columbia and Willamette Basin projects. The coalition developed a procedure to gather information on potential mitigation projects and opportunities. All tribes, agencies and interested parties were contacted in an attempt to evaluate all proposed or potential mitigation. A database was developed and minimum criteria were established for opportunities to be considered. These criteria included the location of the mitigation site within a defined area, as well as other criteria established by the Northwest Power Planning Council. Costs were established for general habitats within the mitigation area, based on estimates from certified appraisers. An analysis of the cost effectiveness of various types of mitigation projects was completed. Estimates of operation and maintenance costs were also developed. The report outlines strategies for gathering mitigation potentials, evaluating them, determining their costs, and attempting to move towards their implementation.

  16. Planning of a small hydroelectric installation project - orientation aids; Vom Plan zum Werk - Orientierungshilfen

    Energy Technology Data Exchange (ETDEWEB)

    Hutarew, A. [Dr. Hutarew und Partner, Pforzheim (Germany)

    1997-12-31

    The article informs in concise form on essential elements of the plannning of a small hydro power project. Understanding and considerateness are demanded from all parties concerned when such a joint project is envisaged. Not one-sided interests should be followed; rather, everyone should contribute towards facilitating renewable energy generation. Some negative examples are cited. (orig.) [Deutsch] In der Kuerze der gebotenen Zeit wurde versucht, wesentliche Eckpfeiler in der Entstehung einer Wasserkraftanlage zu skizzieren. Ziel meiner Ausfuehrungen ist es, von allen Beteiligten Verstaendnis abzuverlangen und Ruecksichtnahme zu praktizieren, geht es doch darum, ein gemeinsames Werk entstehen zu lassen. Wir stehen nicht in der Not, einseitige Interessen zu verfechten, sondern gemeinsam an einem Baustein regenerativer Energieerzeugung zu arbeiten. Es sei mir verziehen, wenn durch die Schilderung von Negativ-Beispielen ein eher unueblicher Weg beschritten wurde. (orig.)

  17. Final Project Report, Bristol Bay Native Corporation Wind and Hydroelectric Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Vaught, Douglas J.

    2007-03-31

    The Bristol Bay Native Corporation (BBNC) grant project focused on conducting nine wind resource studies in eight communities in the Bristol Bay region of southwest Alaska and was administered as a collaborative effort between BBNC, the Alaska Energy Authority, Alaska Village Electric Cooperative, Nushagak Electric Cooperative (NEC), Naknek Electric Association (NEA), and several individual village utilities in the region. BBNC’s technical contact and the project manager for this study was Douglas Vaught, P.E., of V3 Energy, LLC, in Eagle River, Alaska. The Bristol Bay region of Alaska is comprised of 29 communities ranging in size from the hub community of Dillingham with a population of approximately 3,000 people, to a few Native Alaska villages that have a few tens of residents. Communities chosen for inclusion in this project were Dillingham, Naknek, Togiak, New Stuyahok, Kokhanok, Perryville, Clark’s Point, and Koliganek. Selection criteria for conduction of wind resource assessments in these communities included population and commercial activity, utility interest, predicted Class 3 or better wind resource, absence of other sources of renewable energy, and geographical coverage of the region. Beginning with the first meteorological tower installation in October 2003, wind resource studies were completed at all sites with at least one year, and as much as two and a half years, of data. In general, the study results are very promising for wind power development in the region with Class 6 winds measured in Kokhanok; Class 4 winds in New Stuyahok, Clark’s Point, and Koliganek; Class 3 winds in Dillingham, Naknek, and Togiak; and Class 2 winds in Perryville. Measured annual average wind speeds and wind power densities at the 30 meter level varied from a high of 7.87 meters per second and 702 watts per square meter in Kokhanok (Class 6 winds), to a low of 4.60 meters per second and 185 watts per square meter in Perryville (Class 2 winds).

  18. Feasibility study for the City of Twin Falls Sewage Hydroelectric Project in Twin Falls County, Idaho

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-08-01

    The City of Twin Falls, Idaho authorized J-U-B Engineers, Inc., to assess the feasibility of installing a small hydropower plant on the discharge of the City's Grandview sewage trunk line. The concept of developing hydropower from sewage flow is novel and may have applications in other areas of the nation if its technical feasibility can be established. No conventional turbine would be suitable in this application without extensively screening the influent. Therefore, finding a turbine which would work satisfactorily, was one of the major aspects of the study. A solution to this problem was found in a staged, non-clog, hydraulic turbine manufactured by Cornell Pump Co. A preliminary design configuration is presented using these turbines. The economical feasibility of the project depends on future sewage flows from Idaho Frozen Foods Company, a large contributor to the present Twin Falls sewage flows. The yearly revenue, would decrease by about one-third, if Idaho Frozen Foods disconnects from the City's sewage system. Therefore, the project is less feasible, economically, without the flow contributed by Idaho Frozen Foods. The cost of energy production is 47 mils per kilowatt-hour (kWh) with this flow, and about 60 mils/kWh without this flow. At the higher flow rate (5 cfs) the total capital investment is estimated to be $270,200 or approximately $2250 per installed kW capacity. Estimated annual energy production at 5.0 cfs is 440,650 kWh with a subsequent first year annual revenue of $59,460. Power could be put on line within nine months of the time the Twin Falls City Council makes a decision to develop the project.

  19. Case Study and Numerical Analysis of Vibration and Runner Cracks for the Lipno I Hydroelectric Project

    Science.gov (United States)

    Zouhar, J.; Obrovsky, J.; Feilhauer, M.; Skotak, A.

    2016-11-01

    The refurbishment of the Lipno I TG2 Francis turbine, situated on River Vltava, with maximum net head of 165 m and required operational range from 0 to 67MW of turbine power was performed in 2014. The new hydraulic design of the spiral case, distributor and runner was developed for this project. After about 1000 hours of operation the site inspection was performed and the cracks were found on 8 runner blades of 17 blades altogether. The all cracks were found near runner hub beginning from the trailing edge. The dimensions of the cracks were different with maximum length of 123 mm and minimum length of 3 mm. The runner was repaired and the intensive investigation was started to define the main cause of the cracks creation and to determine the measures for their elimination. This paper presents the program of this investigation which consists of static and dynamic blade strain measurement, CFD and FEM analysis, discusses the crack causes and overview the solution how to return the turbine successfully to operation.

  20. Application of finance project for leverage of small size hydroelectric enterprising; Aplicacao do project finance para alavancagem de empreendimentos hidreletricos de pequeno porte

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Silvana dos

    2003-07-01

    In the same way that the majority of the countries, project financing of substructure in Brazil, in project finance modality, depend on a skillful structure of guaranties and contracts to become possible. In the case of projects of centrals of generation of electrical energy, that financial engineering becomes still more complicated. In Brazil, due to particularities of the sectors of electricity, the arrangements of guaranties requested but creditors pass to present levels of complexity and exigency well elevated. The contractual appliances that give support to the project finance, originally projected to developed countries, request an extreme adaptation to these particularities. The development of Brazil is directly related to its capacity in expanding the offer of electric energy in the just measure of the national necessity. In this context, the small central hydroelectric (PCH's) represent, actually, an efficient and fast form to complete the offer of energy in such a way to supply the crescent demand the national market. For its characteristics, that type of undertaking can be developed by small manager, from among which are the owners of the areas in which on can find these hydraulic potentials which, however they do not dispose of capital to integral raising. These undertakings are tasks, normally, of low global cost, at the rate of US$ 1.000,00/k W, and of a smaller ambient impact, compared to the return that they give to the enterprise and to the Brazilian electric system as a whole, by having to receive special attention in the planned politics to the sector and to merit a series of incentives to become business still more attractive. By thinking in the found difficulty by small enterprises in rising undertakings of generation of electric energy of small port through the convectional mechanisms of financing is being proposed in that work a well-founded methodology in the concepts of the modality of financing project finance. (author)

  1. Wildlife Loss Estimates and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Volume Three, Hungry Horse Project.

    Energy Technology Data Exchange (ETDEWEB)

    Casey, Daniel

    1984-10-01

    This assessment addresses the impacts to the wildlife populations and wildlife habitats due to the Hungry Horse Dam project on the South Fork of the Flathead River and previous mitigation of theses losses. In order to develop and focus mitigation efforts, it was first necessary to estimate wildlife and wildlife hatitat losses attributable to the construction and operation of the project. The purpose of this report was to document the best available information concerning the degree of impacts to target wildlife species. Indirect benefits to wildlife species not listed will be identified during the development of alternative mitigation measures. Wildlife species incurring positive impacts attributable to the project were identified.

  2. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Science.gov (United States)

    2010-04-16

    ... Hydroelectric Project (Project) is located at river mile 72.0 on the Flathead River, just downstream from... to, effects on hydroelectric power production, recreation, tourism, irrigation, flooding, treaty...

  3. Electric generator overhaul of the Ing. Carlos Ramirez Ulloa hydroelectric. Central project conclusions; Rehabilitacion de los generadores de la central hidroelectrica Ing. Carlos Ramirez Ulloa. Conclusiones del proyecto

    Energy Technology Data Exchange (ETDEWEB)

    Campuzano Martinez, Ignacio Roberto; Gonzalez Vazquez, Alejandro Esteban; Robles Pimentel, Edgar Guillermo; Esparza Saucedo, Marcos; Garcia Martinez, Javier; Sanchez Flores, Ernesto; Martinez Romero, Jose Luis [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    The Hydroelectric Ing. Carlos Ramirez Ulloa Power Central has three 200 MW electric generators. The Central initiated its commercial operation in 1985. The electric generators had design problems that were properly corrected in an overhaul program that was initiated in 1996, with Unit 2 electric generator and completed in 1998 with Unit 1 electric generator. This paper presents the relevant aspects of the experience accumulated in the project. [Espanol] La central hidroelectrica Ing. Carlos Ramirez Ulloa cuenta con tres generadores de 200 MW cada uno. La central inicio su operacion comercial en 1985. Los generadores tenian problemas de diseno que fueron debidamente corregidos en un programa de rehabilitacion que inicio en 1996, con el generador de la unidad 2, y culmino en 1998 con el generador de la unidad 1. En este articulo se presentan los aspectos relevantes de la experiencia acumulada en el proyecto.

  4. Risk Factors for the Presence of Aedes aegypti and Aedes albopictus in Domestic Water-Holding Containers in Areas Impacted by the Nam Theun 2 Hydroelectric Project, Laos

    Science.gov (United States)

    Hiscox, Alexandra; Kaye, Angela; Vongphayloth, Khamsing; Banks, Ian; Piffer, Michele; Khammanithong, Phasouk; Sananikhom, Pany; Kaul, Surinder; Hill, Nigel; Lindsay, Steven W.; Brey, Paul T.

    2013-01-01

    We assessed risk factors for vectors of dengue and chikungunya viruses near a new hydroelectric project, Nam Theun 2, in Laos. Immature stages of Aedes aegypti were found only in sites within 40 km of the urban provincial capital, but Aedes albopictus was found throughout. Aedes aegypti pupae were most common in water storage jars (odds ratio [OR] = 4.72) and tires (OR = 2.99), and Ae. albopictus pupae were associated with tires in 2009 (OR = 10.87) and drums, tires, and jars in 2010 (drums OR = 3.05; tires OR = 3.45, jars OR = 6.59). Compared with water storage vessels, containers used for hygiene, cooking, and drinking were 80% less likely to harbor Ae. albopictus pupae in 2010 (OR = 0.20), and discarded waste was associated with a 3.64 increased odds of infestation. Vector control efforts should focus on source reduction of water storage containers, particularly concrete jars and tires. PMID:23458958

  5. Project final report: Energetic planning focusing small scale hydroelectric power plants; Relatorio final. Projeto planejamento energetico com enfase em pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Yara dos Santos

    1994-12-31

    Considering the increasing need for a better utilization of the Brazilian hydric resources, a deeper analysis of small scale hydroelectric power plants has been demanding. This work presents a case study of energetic planning based upon small scale hydroelectric power plants in a district of Amazon state - North Brazil 8 refs., 11 figs., 19 tabs.

  6. Small hydroelectric engineering practice

    CERN Document Server

    Leyland, Bryan

    2014-01-01

    Small Hydroelectric Engineering Practice is a comprehensive reference book covering all aspects of identifying, building, and operating hydroelectric schemes between 500 kW and 50 MW. In this range of outputs there are many options for all aspects of the scheme and it is very important that the best options are chosen.As small hydroelectric schemes are usually built against a limited budget it is extremely important that the concept design is optimum and every component is designed to maximise the benefi t and minimise the cost. As operating costs are often a high proportion of the income it i

  7. 76 FR 67169 - Solia 9 Hydroelectric LLC Riverbank Hydro No. 17 LLC Lock Hydro Friends Fund XLI FFP Project 54...

    Science.gov (United States)

    2011-10-31

    ... XLI FFP Project 54 LLC; Notice of Competing Preliminary Permit Applications Accepted for Filing and... XLI (Lock Hydro), and FFP Project 54 LLC (FFP 54) filed preliminary permit applications, pursuant to.... FFP 54's Project No. 14192-000 would consist of: (1) A 350-foot- long, 150-foot-wide approach channel...

  8. Use of technology during planning and construction of a 15 MW hydroelectric project : yesterday, today, and tomorrow

    Energy Technology Data Exchange (ETDEWEB)

    Colwell, D.E. [Construction Technology Centre Atlantic, Fredericton, NB (Canada); Waugh, L.M. [New Brunswick Univ., Fredericton, NB (Canada)

    2007-07-01

    A case study of the technology aspects of a 15 megawatt dam re-development project located in St. George, New Brunswick was presented. The paper provided an overview of the project and identified technologies implemented during the project. The project used 21 innovative and traditional technologies that played an integral role in the project, such as: remote video; digital cameras; a public web site; scheduling software; and cost accounting. The technologies were described and categorized by type, by role, and by purpose. Type categories included hardware, software, LAN/Web, and telecommunications. Role categories include: project management, engineering, and construction. Purpose categories included general, analysis, documentation, interactive, and sharing. Based on the predominate technologies identified in the study and the expertise of the authors, three technologies were selected that had a high potential to be implemented today due to their evolution and for changes in the costs and infrastructure requirements of these technologies. These technologies were interactive whiteboards, web-based collaboration, and virtual reality panoramas. The paper made several recommendations such as continued research on the implementation of technologies for dam projects to identify trends and to suggest technologies that add value to the project, and on the technology adoption cycle within projects, within individual firms, and within specific industries such as dam construction. 17 refs., 2 tabs., 8 figs.

  9. The Rio Lajas hydroelectric project in Costa Rica; Hydro-Quebec International gained from its Quebec expertise; La centrale Rio Lajas, au Costa Rica; Hydro-Quebec International a mis a profit l`expertise quebecoise

    Energy Technology Data Exchange (ETDEWEB)

    Cordeau, P.

    1997-08-01

    The participation of Hydro-Quebec International in the construction and development of the Rio Lajas hydroelectric project in Costa Rica was described. The 10 MW Rio Lajas hydroelectric station in Costa Rica is expected to go into operation in September of 1998. The station is owned by the HRL consortium, which is composed of Hydro-Quebec International and Corporacion Superior. Construction of the station was contracted out to SEH Constructora SA, a company composed of the Costarican contractor Saret and two companies from Quebec; Entreprises Bon Conseil and Hydro-Mecanique. The station comprises two horizontal-axis Francis turbines. Turbines and alternators were respectively supplied by Bouvier and GEC Alsthom, two French manufacturers. Considerable attention was given to the control of the Rio Lajas river, whose discharge can vary by as much as 100 times in the steep volcanic terrains. Approximately 15 Hydro-Quebec employees were delegated to Costa Rica to oversee various stages of the project.

  10. 76 FR 67171 - Solia 7 Hydroelectric LLC; Riverbank Hydro No. 20 LLC; Lock Hydro Friends Fund XLIII; FFP Project...

    Science.gov (United States)

    2011-10-31

    ...-long, 34.5 kilo-volt (kV) transmission line. The proposed project would have an average annual... the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing...

  11. Design criteria applied for the Lower Pressure Tunnel of the North Fork Stanislaus River Hydroelectric Project in California

    Science.gov (United States)

    Schleiss, A.

    1988-07-01

    The application of various criteria and certain new approaches to design is illustrated by the example of the Lower Collierville Pressure Tunnel of the North Fork Stanislaus River Hydropower Project in California. With a maximum internal water pressure of 72 bar, Lower Collierville Tunnel will be, when commissioned in 1989, the highest stressed pressure tunnel in the world not situated in granitic rocks. The geological conditions and the results of the geotechnical investigations are described briefly. For the steel-lined portion of the tunnel, the approach for determining the bearing capacity of the rock mass and the load sharing between steel and rock is discussed. The required length of steel liner was determined on the basis of rock mechanical (hydraulic jacking) and rock hydraulic (seepage losses and extension of saturated zone due to seepage) criteria. The use of a new theory allows the effects of mechanical-hydraulic interaction to be taken into account. Finally the methods of estimating the expected water losses and the sealing effect of the consolidation grouting are described.

  12. Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Volume One, Libby Dam Project, Operator, U.S. Army Corps of Engineers.

    Energy Technology Data Exchange (ETDEWEB)

    Yde, Chris A.

    1984-10-01

    This assessment addresses the impacts to the wildlife populations and wildlife habitats due to the Libby Dam project on the Kootenai River and previous mitigation of these losses. The current assessment documents the best available information concerning the impacts to the wildlife populations inhabiting the project area prior to construction of the dam and creation of the reservoir. Many of the impacts reported in this assessment differ from those contained in the earlier document compiled by the Fish and Wildlife Service; however, this document is a thorough compilation of the available data (habitat and wildlife) and, though conservative, attempts to realistically assess the impacts related to the Libby Dam project. Where appropriate the impacts resulting from highway construction and railroad relocation were included in the assessment. This was consistent with the previous assessments.

  13. Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Phase 1, Volume Two (B), Clark Fork River Projects, Cabinet Gorge and Noxon Rapids Dams, Operator, Washington Water Power Company.

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Marilyn

    1984-06-01

    This report documents best available information concerning the wildlife species impacted and the degree of the impact. A target species list was developed to focus the impact assessment and to direct mitigation efforts. Many non-target species also incurred impacts but are not discussed in this report. All wildlife habitats inundated by the two reservoirs are represented by the target species. It was assumed the numerous non-target species also affected will be benefited by the mitigation measures adopted for the target species. Impacts addressed are limited to those directly attributable to the loss of habitat and displacement of wildlife populations due to the construction and operation of the two hydroelectric projects. Secondary impacts, such as the relocation of railroads and highways, and the increase of the human population, were not considered. In some cases, both positive and negative impacts were assessed; and the overall net effect was reported. The loss/gain estimates reported represent impacts considered to have occurred during one point in time except where otherwise noted. When possible, quantitative estimates were developed based on historical information from the area or on data from similar areas. Qualitative loss estimates of low, moderate, or high with supporting rationale were assessed for each species or species group.

  14. Rock-Eval pyrolysis and vitrinite reflectance results from the Sheep Creek 1 well, Susitna basin, south-central Alaska

    Science.gov (United States)

    Stanley, Richard G.; Lillis, Paul G.; Pawlewicz, Mark J.; Haeussler, Peter J.

    2014-01-01

    We used Rock-Eval pyrolysis and vitrinite reflectance to examine the petroleum source potential of rock samples from the Sheep Creek 1 well in the Susitna basin of south-central Alaska. The results show that Miocene nonmarine coal, carbonaceous shale, and mudstone are potential sources of hydrocarbons and are thermally immature with respect to the oil window. In the samples that we studied, coals are more organic-rich and more oil-prone than carbonaceous shales and silty mudstones, which appear to be potential sources of natural gas. Lithologically similar rocks may be present in the deeper parts of the subsurface Susitna basin located west of the Sheep Creek 1 well, where they may have been buried deeply enough to generate oil and (or) gas. The Susitna basin is sparsely drilled and mostly unexplored, and no commercial production of hydrocarbons has been obtained. However, the existence of potential source rocks of oil and gas, as shown by our Rock-Eval results, suggests that undiscovered petroleum accumulations may be present in the Susitna basin.

  15. 78 FR 69663 - Jonathan and Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-11-20

    ..., 2011,\\1\\ has been transferred to Troy Mills Hydroelectric Inc. The project is located on the Missisquoi River in Orleans County, Vermont. The transfer of an exemption does not require Commission approval. \\1... Energy Regulatory Commission Jonathan and Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer...

  16. 77 FR 12835 - American Land Company, LLC, Burnshire Hydroelectric, LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2012-03-02

    ... 22, 1982,\\1\\ has been transferred to Burnshire Hydroelectric, LLC. The project is located on the North Fork, Shenandoah River in Shenandoah County, Virginia. The transfer of an exemption does not... Energy Regulatory Commission American Land Company, LLC, Burnshire Hydroelectric, LLC; Notice of Transfer...

  17. The small-scale hydroelectric power plant project 'Les Esserts' in Boudry, Switzerland - Feasibility study and preliminary planning; Centrale des Esserts a Boudry. Etude de faisabilite et avant-projet detaille

    Energy Technology Data Exchange (ETDEWEB)

    Roelli, P.; Croci, S.; Ernst, J.-R.

    2004-07-01

    This report describes in details the project of the installation of a small-scale hydroelectric power plant on the river Areuse in Switzerland. Located on a 4 m high waterfall the plant includes a 10-13 m{sup 3}/s Kaplan turbine, which should deliver roughly 1.6 GWh/year for an installed power of about 500 kVA. The authors insist on the ecological aspect of the project. The plant will be built underground; the river track will be practically unchanged and the existing fish ladder maintained. The report includes maps and pictures of the site as well as technical drawings of the installation. An economic analysis of the project is presented and its viability is discussed. Finally, the authors state that the energy produced by this plant will certainly be certified under one of the Swiss labels 'naturemade star' or 'naturemade basic', in the framework of the federal government's promotion of renewable energy sources.

  18. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Science.gov (United States)

    2011-10-05

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sutton Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and a...

  19. The importance of cultural aspects in impact assessment and project: developmentreflections from a case study of a hydroelectric dam in Brazil

    NARCIS (Netherlands)

    Hanna de Almeida Oliveira, Philippe; Vanclay, Frank; Langdon, Esther Jean; Arts, Jos

    2016-01-01

    Failure to consider the cultural and social factors of projects can lead to situations where mitigation does not effectively address the impacts they were intended to alleviate, and can even create other impacts. We critically analyse the processes of designing and implementing a social and

  20. Streamflow record extension for selected streams in the Susitna River Basin, Alaska

    Science.gov (United States)

    Curran, Janet H.

    2012-01-01

    Daily streamflow records for water years 1950–2010 in the Susitna River Basin range in length from 4 to 57 years, and many are distributed within that period in a way that might not adequately represent long-term streamflow conditions. Streamflow in the basin is affected by the Pacific Decadal Oscillation (PDO), a multi-decadal climate pattern that shifted from a cool phase to a warm phase in 1976. Records for many streamgages in the basin fell mostly within one phase of the PDO, such that monthly and annual statistics from observed records might not reflect streamflow conditions over a longer period. Correlations between daily discharge values sufficed for extending streamflow records at 11 of the 14 streamgages in the basin on the basis of relatively long-term records for one or more of the streamgages within the basin, or one outside the basin, that were defined as index stations. Streamflow at the index stations was hydrologically responsive to glacier melt and snowmelt, and correlated well with flow from similar high-elevation, glaciated basins, but flow in low-elevation basins without glaciers could not be correlated to flow at any of the index stations. Kendall-Theil Robust Line multi-segment regression equations developed for one or more index stations were used to extend daily discharge values to the full 61-year period for all 11 streamgages. Monthly and annual statistics prepared for the extended records show shifts in timing of breakup and freeze-up and magnitude of snowmelt peaks largely predicted by the PDO phase.

  1. Uranium concentrations in lake and stream waters and sediments from selected sites in the Susitna River Basin, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    Hill, D.E.

    1977-03-01

    During the summer of 1976, 141 water and 211 sediment samples were taken from 147 locations in the Susitna River basin in Alaska by the Geophysical Institute of the University of Alaska for the LASL. These samples were taken to provide preliminary information on the uranium concentrations in waters and sediments from the Susitna River basin and to test the analytical methods proposed for the NURE Hydrogeochemical and Stream Sediment Reconnaissance for uranium in Alaska. The uranium determinations resulting from the fluorometric analysis of the water samples and the delayed-neutron counting of the sediment samples are presented. The low levels of uranium in the water samples, many of which were below the detectable limit of the LASL fluorometric technique, indicate that a more sensitive analytical method is needed for the analysis of Alaskan water samples from this area. An overlay showing numbered sample locations and overlays graphically portraying the concentrations of uranium in the water and sediment samples, all at 1:250,000 scale for use with existing USGS topographic sheets, are also provided as plates.

  2. Legal obstacles and incentives to the development of small scale hydroelectric power in Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are examined. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Additional sections cover acquisition; liability; Department for Natural Resources and Environmental Protection; energy utilities; local regulations; incidental impacts; financial considerations; and sources of information. In Kentucky, many of the impacts have not been implemented with regard to small-scale hydroelectric energy, since in Kentucky most electricity is coal-generated and any hydroelectric power that does exist, is derived from TVA or the Army Corp of Engineer projects.

  3. Least cost addition of power from hydroelectrical developments: Maximizing existing assets

    Energy Technology Data Exchange (ETDEWEB)

    Felix, Lafontant; Briand, Marie-Helene; Veilleux, Rheaume

    2010-09-15

    Hydroelectric developments built in the early 1900's are nearing their useful lifespan and require significant rehabilitation in order to meet modern safety and performance criteria. Also, global increasing energy costs represent a strong incentive for operators to find low-cost, environment-friendly solutions while increasing energy generation at existing facilities. Projects promoting innovative ways of recycling existing developments are great examples of sustainable development and represent win-win solutions for population and hydropower industry alike. The proposed presentation describes successful projects consisting in the rehabilitation or addition of power to existing hydroelectric. These recycling projects are very attractive from both economic and environmental.

  4. 78 FR 29365 - Nevada Irrigation District; Notice of Authorization for Continued Project Operation

    Science.gov (United States)

    2013-05-20

    ... Operation On April 15, 2011, the Nevada Irrigation District, licensee for the Yuba-Bear Hydroelectric...'s regulations thereunder. The Yuba-Bear Hydroelectric Project is located on Middle Fork River... Yuba-Bear Hydroelectric Project, until such time as the Commission acts on its application for a...

  5. Design Optimization of Spillways at Baihetan Hydroelectric Dam

    OpenAIRE

    Lönn, Jack; Dahl, Oskar

    2016-01-01

    China’s economic prosperity has led to a massive development in the hydropower sector. The Baihetan hydropower project is an ongoing construction and will become the third largest hydroelectric power plant in the world in regards to generating capacity and is projected to be finished in the year 2020.For every fault that an investment this massive has, it will lead to enormous cost and safety risks. Therefore the standards for every detail are especially high to ensure the success of its futu...

  6. Optimal control of hydroelectric facilities

    Science.gov (United States)

    Zhao, Guangzhi

    This thesis considers a simple yet realistic model of pump-assisted hydroelectric facilities operating in a market with time-varying but deterministic power prices. Both deterministic and stochastic water inflows are considered. The fluid mechanical and engineering details of the facility are described by a model containing several parameters. We present a dynamic programming algorithm for optimizing either the total energy produced or the total cash generated by these plants. The algorithm allows us to give the optimal control strategy as a function of time and to see how this strategy, and the associated plant value, varies with water inflow and electricity price. We investigate various cases. For a single pumped storage facility experiencing deterministic power prices and water inflows, we investigate the varying behaviour for an oversimplified constant turbine- and pump-efficiency model with simple reservoir geometries. We then generalize this simple model to include more realistic turbine efficiencies, situations with more complicated reservoir geometry, and the introduction of dissipative switching costs between various control states. We find many results which reinforce our physical intuition about this complicated system as well as results which initially challenge, though later deepen, this intuition. One major lesson of this work is that the optimal control strategy does not differ much between two differing objectives of maximizing energy production and maximizing its cash value. We then turn our attention to the case of stochastic water inflows. We present a stochastic dynamic programming algorithm which can find an on-average optimal control in the face of this randomness. As the operator of a facility must be more cautious when inflows are random, the randomness destroys facility value. Following this insight we quantify exactly how much a perfect hydrological inflow forecast would be worth to a dam operator. In our final chapter we discuss the

  7. Aquatic biology and hydroelectric power development in New Zealand

    National Research Council Canada - National Science Library

    Henriques, P. R

    1987-01-01

    .... The first section summarizes the country's hydroelectric resources and their utilization. The legal and planning framework associated with hydroelectric power development and the environment is covered in the second section...

  8. 76 FR 72196 - CRD Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for...

    Science.gov (United States)

    2011-11-22

    ... for transfer of license for the Red Rock Hydroelectric Project, No. 12576, located on the Des Monies River in Marion County, Iowa. Applicants seek Commission approval to transfer the license for the Red... Application for Transfer of License, and Soliciting Comments and Motions To Intervene On October 14, 2011, CRD...

  9. Daily storage management of hydroelectric facilities

    NARCIS (Netherlands)

    Chappin, E.J.L.; Ferrero, M.; Lazzeroni, P.; Lukszo, Z.; Olivero, M.; Repetto, M.

    2012-01-01

    This work presents a management procedure for hydroelectric facilities with daily storage. The water storage gives an additional degree of freedom allowing to shift in time power production when it is more convenient and to work at the maximum efficiency of hydraulic turbine. The management is

  10. Improvement of hydroelectric power generation using pumped ...

    African Journals Online (AJOL)

    Understanding the dynamics of these variables, and the correlation b etween them are core to proper planning and management of a hydroelectric power station. In this Study, simple mathematical methods that include linear programming and statistical analysis based on simulation techniques were used to evaluate vital ...

  11. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    Energy Technology Data Exchange (ETDEWEB)

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  12. Hydroelectricity - An Answer To Energy Needs

    Energy Technology Data Exchange (ETDEWEB)

    Francois-Xausa, Maryse; Havard, David; Czerwinski, Francois; Teller, Olivier

    2010-09-15

    The energy challenges of the next 30 years appear daunting and, in certain cases, in conflict with one another. Their complexity is such that one solution alone cannot provide a full answer. It is nevertheless equally clear that hydro-electricity, being renewable, proven, highly efficient, storable and with still very significant resource potential, possesses a unique combination of attributes which will aid decision-makers to plan and execute energy development with confidence.

  13. Baseline Channel Geometry and Aquatic Habitat Data for Selected Streams in the Matanuska-Susitna Valley, Alaska

    Science.gov (United States)

    Curran, Janet H.; Rice, William J.

    2009-01-01

    Small streams in the rapidly developing Matanuska-Susitna Valley in south-central Alaska are known to support anadromous and resident fish but little is known about their hydrologic and riparian conditions, or their sensitivity to the rapid development of the area or climate variability. To help address this need, channel geometry and aquatic habitat data were collected in 2005 as a baseline of stream conditions for selected streams. Three streams were selected as representative of various stream types, and one drainage network, the Big Lake drainage basin, was selected for a systematic assessment. Streams in the Big Lake basin were drawn in a Geographic Information System (GIS), and 55 reaches along 16 miles of Meadow Creek and its primary tributary Little Meadow Creek were identified from orthoimagery and field observations on the basis of distinctive physical and habitat parameters, most commonly gradient, substrate, and vegetation. Data-collection methods for sites at the three representative reaches and the 55 systematically studied reaches consisted of a field survey of channel and flood-plain geometry and collection of 14 habitat attributes using published protocols or slight modifications. Width/depth and entrenchment ratios along the Meadow-Little Meadow Creek corridor were large and highly variable upstream of Parks Highway and lower and more consistent downstream of Parks Highway. Channel width was strongly correlated with distance, increasing downstream in a log-linear relation. Runs formed the most common habitat type, and instream vegetation dominated the habitat cover types, which collectively covered 53 percent of the channel. Gravel suitable for spawning covered isolated areas along Meadow Creek and about 29 percent of Little Meadow Creek. Broad wetlands were common along both streams. For a comprehensive assessment of small streams in the Mat-Su Valley, critical additional data needs include hydrologic, geologic and geomorphic, and biologic data

  14. Ultra-low-head hydroelectric technology: A review

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Daqing; Deng, Zhiqun (Daniel)

    2017-10-01

    In recent years, distributed renewable energy-generation technologies, such as wind and solar, have developed rapidly. Nevertheless, the utilization of ultra-low-head (ULH) water energy (i.e., situations where the hydraulic head is less than 3 m or the water flow is more than 0.5 m/s with zero head) has received little attention. We believe that, through technological innovations and cost reductions, ULH hydropower has the potential to become an attractive, renewable, and sustainable resource. This paper investigates potential sites for ULH energy resources, the selection of relevant turbines and generators, simplification of civil works, and project costs. This review introduces the current achievements on ULH hydroelectric technology to stimulate discussions and participation of stakeholders to develop related technologies for further expanding its utilization as an important form of renewable energy.

  15. Joint Venture Modes of Water Conservancy and Hydroelectric Engineering

    Directory of Open Access Journals (Sweden)

    Zhiding Chen

    2013-07-01

    Full Text Available With the long construction period, the giant scope and complex technology, water conservancy and hydroelectric engineering construction has large investment. In the fully competitive water conservancy and hydropower project construction contracting market, it is almost impossible for a company to contract with a water conservancy and hydropower project independently. Therefore, water conservancy and hydropower project construction can be contracted by several construction companies together, to play each company's strengths, lower offer, improve project quality, shorten the construction period and win the competition. In this paper, we started from the definition of Joint Venture, summed up the forms of Joint Venture in water conservancy and hydropower engineering, proposed that the JV modes can be divided into domestic and international union, tight mode, half-tight mode, loose mode, incorporation and consortium. Furthermore, we analyzed the advantages and disadvantages of Joint Venture. Put forward that the JV can relieve the owner from interfacial administrative work, reduce risk of engineering, and raise the success rate of engineering contract, improve the correctness of price and increase the opportunity of project contracting, Learn from other members, enhance technology and management and make full use of idle resources

  16. Climate change impact on operation of dams and hydroelectricity generation in the Northeastern United States

    Science.gov (United States)

    Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.

    2016-12-01

    We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.

  17. NEURAL CASCADED WITH FUZZY SCHEME FOR CONTROL OF A HYDROELECTRIC POWER PLANT

    OpenAIRE

    A. Selwin Mich Priyadharson; T. Ramesh Kumar; M. S. Saravanan; C. ThilipKumar; D. Dileepan

    2014-01-01

    A novel design for flow and level control in a hydroelectric power plant using Programmable Logic Controller (PLC)-Human Machine Interface (HMI) and neural cascaded with fuzzy scheme is proposed. This project will focus on design and development of flow and level controller for small scale hydro generating units by implementing gate control based on PLC-HMI with the proposed scheme. The existing control schemes have so many difficulties to manage intrinsic time delay, nonlinearity due to unce...

  18. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development II: Design Consideration for Passing Fish Upstream Around Dams

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrandt, S. G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bell, M. C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Anderson, J. J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Richey, E. P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Parkhurst, Z. E. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    1980-08-01

    The purpose of this report is to provide general information for use by potential developers of small scale hydroelectric projects that will include facilities to pass migrating fish upstream around dams. The document is not intended to be a textbook on design of fish passage facilities, but rather to be a general guide to some factors that are important when designing such facilities.

  19. Mission: Partnerships - A Socially Responsible Approach for New Hydro-electric Developments

    Energy Technology Data Exchange (ETDEWEB)

    Wojczynski, Ed; Cole, Victoria; Pachal, Shawna; Goulet, Richard

    2010-09-15

    Worldwide there is a desire for clean, secure and renewable energy developed in an environmentally and socially responsible manner. In the Canadian province of Manitoba, where water is an abundant resource, efforts are being undertaken by Manitoba Hydro to achieve this goal through the development of new hydro-electric generating stations in partnership with Aboriginal (indigenous) communities. This paper focuses on the lessons learned by Manitoba Hydro in developing and implementing partnership agreements with northern Aboriginal communities on two new generation projects - the Wuskwatim Generation Project and the Keeyask Generation Project.

  20. Small-scale hydroelectric power in the Pacific Northwest: new impetus for an old energy source

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    Energy supply is one of the most important issues facing Northwestern legislators today. To meet the challenge, state legislatures must address the development of alternative energy sources. The Small-Scale Hydroelectric Power Policy Project of the National Conference of State Legislators (NCSL) was designed to assist state legislators in looking at the benefits of one alternative, small-scale hydro. Because of the need for state legislative support in the development of small-scale hydroelectric, NCSL, as part of its contract with the Department of Energy, conducted the following conference on small-scale hydro in the Pacific Northwest. The conference was designed to identify state obstacles to development and to explore options for change available to policymakers. A summary of the conference proceedings is presented.

  1. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 3. Mid-Continent region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The US Corps of Engineers' assessment of the nation's hydroelectric resources provides a current and comprehensive estimate of the potential for incremental or new generation at existing dams and other water resource projects, as well as for undeveloped sites in the US. The demand for hydroelectric power is addressed and various related policy and technical considerations are investigated to determine the incentives, constraints, and impacts of developing hydropower to meet a portion of the future energy demands. The comprehensive data represent the effort of the Corps of Engineers based on site-specific analysis and evaluation. Summary tables include estimates of the potential capacity and energy at each site in the inventory. The number of sites and potential capacity in each state are identified, but specific detailed information is included for sites in Colorado, Kansas, Montana, Nebraska, New Mexico, North Dakota, Oklahoma, South Dakota, Texas, and Wyoming.

  2. FORESIGHT - ECOSUSTAINABLE DETERMINANTS OF STRATEGIC MODERNIZATION OF HYDROELECTRIC POWER PLANTS

    Directory of Open Access Journals (Sweden)

    L. Dovgan

    2015-08-01

    Full Text Available In the paper the foresight methodology as an ecosustainable determinants of strategic modernization of hydroelectric power plants in the conditions of the external challenges and threats is revealed. The strategic concepts of modernization and a mechanism of strategic modernization of hydroelectric power plants on the principles of public-private partnerships is allocated. Recommendations on the implementation of the results of the strategic foresight to the modernization of hydroelectric power plants in the interaction of public and private agents are formulated.

  3. Development methodologies for the assessment of impacts of small scale hydroelectric power plant projects on migratory fish; Desenvolvimento metodologico para avaliacao de impactos de empreendimentos hidreletricos de pequeno porte sobre peixes migradores

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Lucas Goncalves da; Barradas, Jose Ricardo de Souza [Pontificia Universidade Catolica do Rio Grande do Sul (UFRGS), Porto Alegre, RS (Brazil). Dept. de Biodiversidade e Ecologia], E-mail: lucas.silva@pucrs.br

    2009-10-15

    Dams influence directly the process of fish migration. Assessing the impact of these infrastructure and direct research for that purpose minimize environmental impacts resulting from projects on biodiversity. Through computer models and probability logistic regressions of occurrence that take into account geomorphologic parameters (elevation and basin area) was obtained a standard distribution model of migratory fishes species in the upper Uruguay river basin (RS/SC) with high calibration (84.39% of adherence). The computational modelling significantly increases the knowledge about methodologies for evaluate environmental impacts caused by small and large dams and applicability in other basins. (author)

  4. Social-environmental fragility analysis for diagnosis of watershed in study of hydroelectric projects; Analise de fragilidade socioambiental para o diagnostico de bacias hidrograficas no estudo de empreendimentos hidreletricos

    Energy Technology Data Exchange (ETDEWEB)

    Maciel, Jonas Fernandes; Dzedzej, Maira [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil); Oliveira, Samuel Torres de; Flauzino, Barbara [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba, (UNIFEI), MG (Brazil)

    2010-07-01

    This paper presents a methodology for assessing the social-environmental fragility of a watershed where there is potential for installation of hydropower projects. The method includes dividing the watershed into sub areas (by analysis of similar characteristics) and, subsequently, the use of 23 indicators grouped into six social-environmental components (Water Resources and Aquatic Ecosystems, Terrestrial Ecosystems and the Physical Environment, Territorial Organization, Way of Life, Economic Base and Indigenous Communities and Traditional Populations), which together seek to portray all aspects involved in the fragility of the area. The technique was applied in the basin of the Coxim river in the State of Mato Grosso do Sul, assuming that there is interest or the possibility of installing hydropower plants within its boundaries. The basin was divided into three sub areas, considering physical parameters (such as topography, rainfall and hydrology), which were ranked by calculating the fragility of each one of the social-environmental indicators. As a result, a map was created to indicate the sub areas more susceptible to damage and those which should be more resistant to the installation of impacting activities, such as hydropower plants. The use of Geographic Information Systems (GIS) and the work of a multidisciplinary team can reduce the degree of subjectivity of the methodology and allow, (by modifying some considerations inherent in the partial calculations,) its application in other situations where the possibility of installing hydropower projects is not considered. (author)

  5. Itaipu royalties: The role of the hydroelectric sector in water resource management.

    Science.gov (United States)

    Lorenzon, Alexandre Simões; Alvares Soares Ribeiro, Carlos Antonio; Rosa Dos Santos, Alexandre; Marcatti, Gustavo Eduardo; Domingues, Getulio Fonseca; Soares, Vicente Paulo; Martins de Castro, Nero Lemos; Teixeira, Thaisa Ribeiro; Martins da Costa de Menezes, Sady Júnior; Silva, Elias; de Oliveira Barros, Kelly; Amaral Dino Alves Dos Santos, Gleissy Mary; Ferreira da Silva, Samuel; Santos Mota, Pedro Henrique

    2017-02-01

    For countries dependent on hydroelectricity, water scarcity poses a real risk. Hydroelectric plants are among the most vulnerable enterprises to climate change. Investing in the conservation of the hydrographic basin is a solution found by the hydropower sector. Given the importance of the Itaipu plant to the energy matrix of Brazil and Paraguay, the aim of this study is to review the current distribution of royalties from Itaipu, using the hydrographic basin as a of criterion of analysis. Approximately 98.73% of the Itaipu basin is in Brazil. The flow contributes 99% of the total electricity generated there, while the drop height of the water contributes only 1%. Under the current policy, royalties are shared equally between Brazil and Paraguay. In the proposed approach, each country would receive a percentage for their participation in the drop height and water flow in the output of the turbines, which are intrinsic factors for electricity generation. Thus, Brazil would receive 98.35% of the royalties and Paraguay, 1.65%. The inclusion of the hydrographic basin as a criterion for the distribution of royalties will promote more efficient water resource management, since the payment will be distributed throughout the basin of the plant. The methodology can be applied to hydroelectric projects worldwide. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. Legal obstacles and incentives to the development of small scale hydroelectric power in West Virginia

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric in West Virginia at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by FERC. The development of small-scale hydroelectric energy depends on the selection of a site which will produce sufficient water power capacity to make the project economically attractive to a developer. In West Virginia, the right to use the flowing waters of a stream, creek, or river is appurtenant to the ownership of the lands bordering the watercourse. The lands are known as riparian lands. The water rights are known as riparian rights. Thus, the first obstacle a developer faces involves the acquisition of riparian lands and the subsequent right to the use of the water. The water law in West Virginia is discussed in detail followed by discussions on direct and indirect regulations; continuing obligations; financial considerations; and interstate organizations.

  7. Vermont Marble Company, Proctor, Vermont: Otter Creek hydroelectric feasibility report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-02-01

    Vermont Marble Company (VMCO) owns and operates four hydroelectric projects in a 50-mile reach of Otter Creek in west central Vermont. This study concerns three of the installations - Center Rutland, Beldens, and Huntington Falls. The fourth site is known as Proctor and will be studied separately. All four plants operate as run-of-river stations, and the limited reservoir storage capacity places severe limitations on any other type of operation. The plants are presently operating at much lower outputs than can be obtained, because they do not use the available discharge and head. The results show that, under the assumptions made in this study, Beldens and Huntington Falls can be economically improved. The rehabilitation of the Center Rutland plant did not look economically attractive. However, the improvement of Center Rutland should not be eliminated from further consideration, because it could become economically attractive if the cost of energy starts escalating at a rate of around 10% per year. The study included a brief appraisal of the existing generating facilities and condition of existing concrete structures, a geological reconnaissance of the sites, analysis of the power potential, flood studies, technical and economic investigations and comparative evaluations of the alternatives for developing the streamflow for power generation, selection of the most suitable alternative, financial analysis, preparation of drawings, and preparation of detailed quantity and cost estimates.

  8. Analysis of environmental issues related to small-scale hydroelectric development. III. Water level fluctuation

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrand, S.G. (ed.)

    1980-10-01

    Potential environmental impacts in reservoirs and downstream river reaches below dams that may be caused by the water level fluctuation resulting from development and operation of small scale (under 25MW) hydroelectric projects are identified. The impacts discussed will be of potential concern at only those small-scale hydroelectric projects that are operated in a store and release (peaking) mode. Potential impacts on physical and chemical characteristics in reservoirs resulting from water level fluctuation include resuspension and redistribution of bank and bed sediment; leaching of soluble organic matter from sediment in the littoral zone; and changes in water quality resulting from changes in sediment and nutrient trap efficiency. Potential impacts on reservoir biota as a result of water level fluctuation include habitat destruction and the resulting partial or total loss of aquatic species; changes in habitat quality, which result in reduced standing crop and production of aquatic biota; and possible shifts in species diversity. The potential physical effects of water level fluctuation on downstream systems below dams are streambed and bank erosion and water quality problems related to resuspension and redistribution of these materials. Potential biological impacts of water level fluctuation on downstream systems below dams result from changes in current velocity, habitat reduction, and alteration in food supply. These alterations, either singly or in combination, can adversely affect aquatic populations below dams. The nature and potential significance of adverse impacts resulting from water level fluctuation are discussed. Recommendations for site-specific evaluation of water level fluctuation at small-scale hydroelectric projects are presented.

  9. landslide hazard zonation around gilgel gibe-ii hydroelectric project

    African Journals Online (AJOL)

    Preferred Customer

    Gohatsion-Dejen), Central. Ethiopia. ... event controlling parameters was made using GIS and Remote Sensing techniques. Getachew Lemmesa et al. ... basement, Eocene to Miocene volcanic rocks,. Quaternary lacustrine deposits, alluvial sediments.

  10. The impact of climate change on hydro-electricity generation

    Energy Technology Data Exchange (ETDEWEB)

    Musy, A.; Music, B.; Roy, R. [Ouranos, Montreal, PQ (Canada)

    2008-07-01

    Hydroelectricity is a clean and renewable energy source for many countries, and is expected to play an important role in future energy supplies. However, the impact of climatic change on hydroelectricity resources is not yet understood. This study provided a critical review of current methods used to determine the potential impacts of climatic change on hydroelectric power production. General circulation models (GCMs) are used to predict future climate conditions under various greenhouse gas (GHG) emissions scenarios. Statistical techniques are then used to down-scale GCM outputs to the appropriate scales needed for hydrological models, which are then used to simulate the effects of climatic change at regional and local scales. Outputs from the models are then used to develop water management models for hydroelectric power production. Observed linear trends in annual precipitation during the twentieth century were provided. The theoretical advantages and disadvantages of various modelling techniques were reviewed. Risk assessment strategies for Hydro-Quebec were also outlined and results of the study will be used to guide research programs for the hydroelectric power industry. refs., tabs., figs.

  11. Flow-Induced Pulsation and Vibration in Hydroelectric Machinery Engineer’s Guidebook for Planning, Design and Troubleshooting

    CERN Document Server

    Dörfler, Peter; Coutu, André

    2013-01-01

    Since the 1970’s, an increasing amount of specialized research has focused on the problems created by instability of internal flow in hydroelectric power plants. However, progress in this field is hampered by the inter­disciplinary nature of the subject, between fluid mechanics, structural mechanics and hydraulic transients. Flow-induced Pulsation and Vibration in Hydroelectric Machinery provides a compact guidebook explaining the many different underlying physical mechanisms and their possible effects.   Typical phenomena are described to assist in the proper diagnosis of problems and various key strategies for solution are compared and considered with support from practical experience and real-life examples. The link between state-of the-art CFD computation and notorious practical problems is discussed  and quantitative data is provided on  normal levels of vibration and pulsation so realistic limits can be set for future projects. Current projects are also addressed as the possibilities and limitatio...

  12. Trophic pathways supporting juvenile Chinook and Coho salmon in the glacial Susitna River, Alaska: patterns of freshwater, marine, and terrestrial resource use across a seasonally dynamic habitat mosaic

    Science.gov (United States)

    Rine, Kristin M.; Wipfli, Mark S.; Schoen, Erik R.; Nightengale, Timothy L.; Stricker, Craig A.

    2016-01-01

    Contributions of terrestrial-, freshwater-, and marine-derived prey resources to stream fishes vary over time and space, altering the energy pathways that regulate production. In this study, we determined large-scale use of these resources by juvenile Chinook and coho salmon (Oncorhynchus tshawytscha and Oncorhynchus kisutch, respectively) in the glacial Susitna River, Alaska. We resolved spatial and temporal trophic patterns among multiple macrohabitat types along a 97 km segment of the river corridor via stable isotope and stomach content analyses. Juvenile salmon were supported primarily by freshwater-derived resources and secondarily by marine and terrestrial sources. The relative contribution of marine-derived prey to rearing salmon was greatest in the fall within off-channel macrohabitats, whereas the contributions of terrestrial invertebrate prey were generally greatest during midsummer, across all macrohabitats. No longitudinal (upstream–downstream) diet pattern was discernable. These results highlight large-scale spatial and seasonal patterns of energy flow and the dynamic interplay of pulsed marine and terrestrial prey subsidies to juvenile Chinook and coho salmon in a large, complex, and relatively pristine glacial river.

  13. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 5. Southeast region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    In the Southeast region, the maximum physical potential for all sites exceeds 48,000 MW with an estimated average annual energy of more than 137,000 GWH. By comparison, these values represent about 9% of both the total potential capacity and hydroelectric energy estimated for the entire US. Of the total capacity estimated for the region, 11,800 MW has been installed. The remainder (36,200 MW) is the maximum which could be developed by upgrading and expanding existing projects (13,000 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (23,200 MW). Small-scale facilities account for some 2% of the region's total installed capacity, but another 700 MW could be added to these and other small water-resource projects. In addition, 1100 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of North Carolina and South Carolina having the largest potential for incremental development at existing projects in the Southeast region. The Southeast region is composed of Arkansas, Louisiana, Mississippi, Tennessee, Alabama, Georgia, Florida, South Carolina, North Carolina, and Virginia.

  14. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 6. Northeast region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    In the Northeast region, the physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy of some 153,000 GWH. By comparison, the available data represent about 6% of the total capacity and 11% of the hydroelectric energy potential estimated for the entire US. Of the total capacity estimated for the region, 6100 MW has been installed. The remainder (27,200 MW, excluding the undeveloped capacity in the New England States) is the maximum which could be developed by upgrading and expanding existing projects (18,700 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (8500 MW). Small-scale facilities account for about 15% of the region's total installed capacity, but another 1800 MW could be added to these and other small water-resource projects. In addition, 500 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of New York, Maine, and New Hampshire having the largest potential for incremental development at existing projects in the Northeast region. West Virginia, Maryland, Delaware, New Jersey, Pennsylvania, New York, Connecticut, Massachusetts, Rhode Island, New Hampshire, Vermont, and Maine comprise the Northeast region.

  15. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 4. Lake Central region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The estimates of existing, incremental and the undeveloped hydropower potential for all states in the various regions of the country are presented. In the Lake Central region, the maximum physical potential for all sites exceeds 26,000 MW with an estimated average annual energy of more than 75,000 GWH. By comparison, these values represent about 5% of both the total potential capacity and hydroelectric energy estimated for the entire US. Of the total capacity estimated for the region, 2600 MW has been installed. The remainder (23,600 MW) is the maximum which could be developed by upgrading and expanding existing projects (15,800 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (7800 MW). Small-scale facilities account for some 24% of the region's total installed capacity, but another 900 MW could be added to these and other small water-resource projects. In addition, 900 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of Michigan and Wisconsin having the largest potential for incremental development at existing projects in the Lake Central region. This Lake Central region is composed of Minnesota, Wisconsin, Michigan, Ohio, Indiana, Illinois, Kentucky, Missouri, and Iowa.

  16. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 2. Pacific Southwest region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The estimates of existing, incremental, and the undeveloped hydropower potential for all states in the various regions of the country are presented. In the Pacific Southwest region, the maximum physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy greater than 85,000 GWH. By comparison, these values represent about 6% of the total potential capacity and hydroelectric energy generation estimated for the entire US. Of the total capacity estimated for the region, 9900 MW has been installed. The remainder (23,200 MW) is the maximum which could be developed by upgrading and expanding existing projects (6000 MW) and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (17,200 MW). Small-scale facilities account for less than 4% of the region's total installed capacity, but another 600 MW could be added to these and other small water resource projects. In addition, 600 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of California and Utah having the largest potential for incremental development at existing projects in the Pacific Southwest region. States comprising the Southwest are Arizona, California, Hawaii, Nevada, and Utah.

  17. Widespread Forest Vertebrate Extinctions Induced by a Mega Hydroelectric Dam in Lowland Amazonia.

    Directory of Open Access Journals (Sweden)

    Maíra Benchimol

    Full Text Available Mega hydropower projects in tropical forests pose a major emergent threat to terrestrial and freshwater biodiversity worldwide. Despite the unprecedented number of existing, under-construction and planned hydroelectric dams in lowland tropical forests, long-term effects on biodiversity have yet to be evaluated. We examine how medium and large-bodied assemblages of terrestrial and arboreal vertebrates (including 35 mammal, bird and tortoise species responded to the drastic 26-year post-isolation history of archipelagic alteration in landscape structure and habitat quality in a major hydroelectric reservoir of Central Amazonia. The Balbina Hydroelectric Dam inundated 3,129 km2 of primary forests, simultaneously isolating 3,546 land-bridge islands. We conducted intensive biodiversity surveys at 37 of those islands and three adjacent continuous forests using a combination of four survey techniques, and detected strong forest habitat area effects in explaining patterns of vertebrate extinction. Beyond clear area effects, edge-mediated surface fire disturbance was the most important additional driver of species loss, particularly in islands smaller than 10 ha. Based on species-area models, we predict that only 0.7% of all islands now harbor a species-rich vertebrate assemblage consisting of ≥80% of all species. We highlight the colossal erosion in vertebrate diversity driven by a man-made dam and show that the biodiversity impacts of mega dams in lowland tropical forest regions have been severely overlooked. The geopolitical strategy to deploy many more large hydropower infrastructure projects in regions like lowland Amazonia should be urgently reassessed, and we strongly advise that long-term biodiversity impacts should be explicitly included in pre-approval environmental impact assessments.

  18. Mitigation and recovery of methane emissions from tropical hydroelectric dams

    Energy Technology Data Exchange (ETDEWEB)

    Bambace, L.A.W.; Ramos, F.M.; Lima, I.B.T.; Rosa, R.R. [Instituto Nacional de Pesquisas Espaciais (INPE), Sao Jose dos Campos (Brazil)

    2007-06-15

    Tropical hydroelectric reservoirs generally constitute an appreciable source of methane to the atmosphere. This paper proposes simple mitigation and recovery procedures to substantially reduce atmospheric methane emissions from hydroelectric reservoirs. We aim at transforming existing methane stocks of tropical reservoirs into a clean, renewable energy source. The recovered gas methane may be pumped to large consuming centers, stocked locally and burned in gas turbines to generate electricity during high demand periods, or even purified for transport applications. Our simulations show that the use of biogenic methane may increase considerably the energy supply in countries like Brazil. As a result, it would be possible to reduce the need of additional hydroelectric dams, protecting important pristine biomes, and avoiding the resettlement of villages and indigenous reserves. (author)

  19. [Hygienic characteristics of work conditions at large Hydroelectric Power Plants with mechanization and automatization].

    Science.gov (United States)

    Iakimova, L D

    1997-01-01

    The article touches upon hygienic problems associated with mechanization and automation of major hydroelectric power stations. The authors present criteria to evaluate work conditions of the main occupations participating in the technologic process of hydroelectric power stations.

  20. Impact of High Wind Power Penetration on Hydroelectric Unit Operations in the WWSIS

    Energy Technology Data Exchange (ETDEWEB)

    Hodge, B.-M.; Lew, D.; Milligan, M.

    2011-07-01

    This report examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating patterns are examined both for an aggregation of all hydro generators and for select individual plants.

  1. Impact of High Wind Power Penetration on Hydroelectric Unit Operations: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Hodge, B. M.; Lew, D.; Milligan, M.

    2011-10-01

    This paper examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators.

  2. Monitoring marginal erosion in hydroelectric reservoirs with terrestrial mobile laser scanner

    Directory of Open Access Journals (Sweden)

    A. M. G. Tommaselli

    2014-06-01

    Full Text Available Marginal erosions in reservoirs of hydroelectric plants have caused economic and environmental problems concerning hydroelectric power generation, reduction of productive areas and devaluing land parcels. The real extension and dynamics of these erosion processes are not well known for Brazilian reservoirs. To objectively assess these problems Unesp (Univ Estadual Paulista and Duke Energy are developing a joint project which aims at the monitoring the progression of some erosive processes and understanding the causes and the dynamics of this phenomenon. Mobile LASER scanning was considered the most suitable alternative for the challenges established in the project requirements. A MDL DynaScan Mobile LASER M150 scanner was selected which uses RTK for real time positioning integrated to an IMU, enabling instantaneous generation of georeferenced point clouds. Two different reservoirs were choose for monitoring: Chavantes (storage plant and Rosana (run-of-river plant, both in the Paranapanema River, border of São Paulo and Paraná States, Brazil. The monitoring areas are scanned quarterly and analysed with base on the point cloud, meshes, contours and cross sections. Cross sections are used to visualize and compute the rate and the dynamics of erosion. Some examples and quantitative results are presented along with an analysis of the proposed technique. Some recommendations to improve the field work and latter data processing are also introduced.

  3. University-Company Cooperation in a Hydroelectric Plant: Cooperation Study in Environmental Management

    Directory of Open Access Journals (Sweden)

    Fabricio Mussi

    2017-05-01

    Full Text Available Hydroelectric power plants are considered strategic for the country when considering their relevance and impact on other sectors of the economy. However, the dynamics of the operation of a plant, its support structure and power generation activities can cause impacts on the environment, which must be constantly monitored in order to mitigate any environmental risks. The purpose of this study is to examine the partnership relations between a plant by menas of the creation of a department within the environmental management and universities and research institutes to identify specific partnerships in environmental management and hydroelectric plants. Six projects have been selected for analysis, four of them related to projects with universities and two related to cooperation with research institutes. The focus of the analysis was restricted to the main points observed in the management of these partnerships, which are: (a motivation for establishing partnerships, (b the composition of the estimated costs for implementing these partnerships, (c the difficulties of reconciling technical management and financial management, and (d the measurement of results and contributions from these interactions. Administrative practices of management of partnerships were also analyzed in the stages preceding cooperation for cooperation and further cooperation. Although other such studies are needed to strengthen the findings presented, one can conclude that the purposes of the establishment of cooperation in environmental management differ from those observed in other fields of knowledge such as engineering and biotechnology, for example.

  4. 75 FR 71102 - White Mountain Hydroelectric Corp.; Notice of Application for Amendment of License, and...

    Science.gov (United States)

    2010-11-22

    ... Federal Energy Regulatory Commission White Mountain Hydroelectric Corp.; Notice of Application for....: 11313-019. c. Date Filed: March 31, 2010. d. Applicant: White Mountain Hydroelectric Corp. e. Name of... Contact: Peter Govoni, White Mountain Hydroelectric Corp., P.O. Box 715, Lincoln, New Hampshire 03251...

  5. micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    Introduction about hydroelectric powers plants (small scale). May 2000,. Yaoundé, Cameroun. 51pp. Lejeune A. et Toplicéanu I., 2004. Energie. Renouvelables et Cogénération pour le. Développement Durable en Afrique. Colloque. International, ENSP Université de Yaoundé I. 246pp. Linsley R. K. and Franzini J.B., 1972.

  6. Micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    The objective of the present work is to characterise the state of ten Micro Hydroelectric Power Plants (MHPPs) installed in the west region of Cameroon, in preparation for their modernization. The work was carried out between January 2006 and December 2008. Each site was visited at least once a month. During these ...

  7. Recurrent Holocene movement on the Susitna Glacier Thrust Fault: The structure that initiated the Mw 7.9 Denali Fault earthquake, central Alaska

    Science.gov (United States)

    Personius, Stephen; Crone, Anthony J.; Burns, Patricia A.; Reitman, Nadine G.

    2017-01-01

    We conducted a trench investigation and analyzed pre‐ and postearthquake topography to determine the timing and size of prehistoric surface ruptures on the Susitna Glacier fault (SGF), the thrust fault that initiated the 2002 Mw 7.9 Denali fault earthquake sequence in central Alaska. In two of our three hand‐excavated trenches, we found clear evidence for a single pre‐2002 earthquake (penultimate earthquake [PE]) and determined an age of 2210±420  cal. B.P. (2σ) for this event. We used structure‐from‐motion software to create a pre‐2002‐earthquake digital surface model (DSM) from 1:62,800‐scale aerial photography taken in 1980 and compared this DSM with postearthquake 5‐m/pixel Interferometric Synthetic Aperature Radar topography taken in 2010. Topographic profiles measured from the pre‐earthquake DSM show features that we interpret as fault and fold scarps. These landforms were about the same size as those formed in 2002, so we infer that the PE was similar in size to the initial (Mw 7.2) subevent of the 2002 sequence. A recurrence interval of 2270 yrs and dip slip of ∼4.8  m yield a single‐interval slip rate of ∼1.8  mm/yr. The lack of evidence for pre‐PE deformation indicates probable episodic (clustering) behavior on the SGF that may be related to strain migration among other similarly oriented thrust faults that together accommodate shortening south of the Denali fault. We suspect that slip‐partitioned thrust‐triggered earthquakes may be a common occurrence on the Denali fault system, but documenting the frequency of such events will be very difficult, given the lack of long‐term paleoseismic records, the number of potential thrust‐earthquake sources, and the pervasive glacial erosion in the region.

  8. The fish fauna of Tibagi river basin and the construction project of Mauá hydroelectric plant, Paraná, Brazil A ictiofauna da bacia do rio Tibagi e o projeto de construção da UHE Mauá, Paraná, Brasil

    Directory of Open Access Journals (Sweden)

    Sirlei Terezinha Bennemann

    2010-10-01

    Full Text Available The middle stretch of Tibagi river basin in the State of Paraná, where the hydroelectric plant of Mauá is planned to be constructed, was considered by the Ministério do Meio Ambiente (MMA as an area of priority for conservation. The environmental impacts studies for the species of fish were considered incomplete, inconsistent and not valid by researchers from the Universidade Estadual de Londrina. Thus, with the purpose of verifying which species of fish occur in stretches of Tibagi river and an affluent threatened by the project, Barra Grande river, a list of species that appear on the reports (EIA/RIMA with species collected in this study and in literature, were compared. In the EIA/RIMA reports 125 fish species were registered. This study added 26 species than those recorded in the EIA, totaling 151 species, for the Tibagi river basin. Among those who did not appear in the EIA, five were collected in stretches of Tibagi river and two in Barra Grande river. The others are from current studies carried out in the middle and upper regions of Tibagi river. These results confirmed the errors presented in the EIA, emphasizing that several species can be new for science. Therefore, the studies presented in the by the CNEC S.A., and approved by Instituto Ambiental do Paraná (IAP, do not support propositions drawn to weaken the effects of the Mauá dam over the fish species that could be attained. A construção da hidrelétrica Mauá foi projetada no médio rio Tibagi, Paraná, local identificado pelo Ministério do Meio Ambiente (MMA como área prioritária para a conservação. Os estudos de impactos ambientais, para as espécies de peixes, foram considerados incompletos, inconsistentes e inválidos pelos pesquisadores da Universidade Estadual de Londrina. Assim, com o objetivo de verificar quais espécies de peixes ocorrem em trechos do rio Tibagi e em um afluente ameaçado pelo projeto, o rio Barra Grande, comparou-se a lista de espécies que

  9. Static ice loads on hydro-electric structures: ice loads monographs: Volume 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Comfort, G.; Abdelnour, R.; Gong, Y.; Dinovitzer, A.

    1996-07-01

    Ice loads on hydro-electric structures were measured during a four-year field program. Loads were measured at Hydro-Quebec`s Paugan dam, Ontario Hydro`s Arnprior and Otto Holden dams, and in a large outdoor basin at the National Research Council (NRC) during one winter. The overall objective was to improve techniques for predicting ice loads on hydro-electric structures and the factors controlling them. The final report on the project was submitted as volume 1 of this two-volume work. This second volume contains the following appendices: (1) the stress distribution analyses for the Arnprior and Otto Holden dam sites, (2) the finite element model for the Arnprior and Otto Holden dams and reservoirs, (3) a numerical model of the loads produced by water level changes, (4) a model used to investigate the load distribution between the Paugan dam`s gates and piers, (5) a comparison between the measured loads and those given by the available ice load predictors, (6) ice cracking patterns at the dams, and (7) a listing of monitoring sites and sensor layouts use in this study. tabs., figs.

  10. Small hydroelectric power plant St. Marienthal Monastery, Ostritz; Kleinwasserkraftanlage Kloster St. Marienthal, Ostritz

    Energy Technology Data Exchange (ETDEWEB)

    Kubens, C. [KUBENS Ingenieurgesellschaft mbH, Nuernberg (Germany)

    2003-07-01

    The hydroelectric power plant St. Marienthal Monastery on the river Lausitzer Neisse, which forms part of the border between Poland and Germany, was rehabilitated and modernized in the period between October 1999 and September 2000. The scheme to reactivate this plant was implemented as an external EXPO 2000 project for renewable energy production and sustainable management. On 6 October 2000, the hydroelectric power plant was officially put back into operation by Steffen Flath, Minister for the Environment and Agriculture in the German state of Saxony. The paper describes the special planning factors involved and the execution of construction work. (orig.) [German] Die Erneuerung der Wasserkraftanlage Kloster St. Marienthal an der Lausitzer Neisse, dem Grenzgewaesser zwischen Polen und Deutschland erfolgte als externes EXPO 2000-Projekt fuer alternative Energiegewinnung und nachhaltiges Wirtschaften von Oktober 1999 bis September 2000. Am 6. Oktober 2000 konnte die Wasserkraftanlage vom Saechsischen Staatsminister fuer Umwelt und Landwirtschaft Steffen Flath nach kirchlicher Weihe in Betrieb genommen werden. Ueber die Besonderheiten der Planung sowie die Bauausfuehrung wird berichtet. (orig.)

  11. Case studies of the legal and institutional obstacles and incentives to the development of small-scale hydroelectric power. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    Schwartz, Larry; Wilson, William

    1979-11-01

    This Executive Summary presents observations, conclusions, and recommendations developed from the completion of five (5) case studies of hydroelectric sites at High Falls, Georgia; Traverse City, Michigan; Swanville Lake, Maine; Cornell, Wisconsin; and Maxwell Locks, Pennsylvania. The work was accomplished by the Energy Law Institute of the Franklin Pierce Law Center, Concord, NH, for the National Conference of State Legislatures. The material contained here is, in part, a summary of the five separate reports on the legal and institutional barriers and incentives bearing on the development of each site. It is also a summary of the cumulative impressions of the actual general legal and institutional climate for small-scale hydroelectric development represented by the issues confronting each site. This document provides a general analysis and overview of the significant problems and opportunities for the development of hydroelectric facilities identified in the five full reports. A second Executive Summary is presented on the findings of two case studies of small-scale hydroelectric power at existing dams. The projects reviewed are: six sites in the irrigation system known as the Columbia Basin Project and two sites in the Bull Run watershed which supplies water to the City of Portland, Oregon. Key incentives and impediments are identified in these case studies conducted at the University of Washington.

  12. Feasibility of determination of low-head hydroelectric power development at existing sites. Big Blue River Co-dependent Hydroelectric Development: feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Wacker, H. Steve; Feuerberg, Stan; Lawrence, John D.; Pal, Parimal C.; Trick, Dr., William T.

    1979-03-01

    The technical, economic, environmental, safety, and financial aspects of redeveloping 7 dam sites in Nebraska for hydroelectric power generation were studied. The Big Blue River Co-dependent Hydroelectric Development was found to be a technically feasible concept, for both redevelopment and in some cases rehabilitation of seven existing sites. The proposed redevelopment project will include seven installations with a recommended nominally rated redeveloped capacity of 3920 kW ranging from 120 kW at the northernmost site in Seward County to 1500 kW at Barneston. The average annual gross generation expected from the seven redeveloped sites totals 11,555,000 kWh. It is estimated that the total cost of redevelopment of these seven sites will be $14,090,000 at 1979 price levels, providing power at an average levelized cost of about 5.3 cents per kWh based on 7% cost of money, a mid-1983 commissioning date, and allowing for funds during construction and cost escalation over a 30-year period. Rehabilitation of original installations at Crete, Dewitt, Blue Springs and Barneston is technically feasible for a total installed capacity of 1415 kW with annual average gross generation of 6,675,000 kWh. The total cost of this rehabilitation is estimated as $3,372,000 at 1979 price levels, or about 2.4 cents per kWh, levelized on a similar basis. Rehabilitation of the Barneston site alone for an installed capacity of 760 kW and annual generation of 3,581,000 kWh is both technically and economically feasible. The total estimated cost of this alternative is $668,000, providing power at a cost of about 1.9 cents per kWh at 1979 price levels. The benefit-cost ratio for Barneston rehabilitation is estimated as 1.23.

  13. Low head hydroelectric installation. Installation hydroelectrique de basse chute

    Energy Technology Data Exchange (ETDEWEB)

    Megnint, L.

    1987-08-04

    A low head hydroelectric installation, in particular for tidal power plant use, is intended to function at variable head heights which can descend to near-zero values. While the head height is lower than a determined value, inferior to at least half the nominal head, the turbomachinery is made to turn at a speed lower than the synchronizing speed and bringing its output near the middle of the output curve. A frequency converter is inserted between the electric generator and the power network, said converter being constructed for a power in any case inferior to at least half of the nominal power. The invention also concerns a process for obtaining at the outlet of a hydraulic turbine an optimal output under a defined, nominal head or output, corresponding to a nominal power of a low head hydroelectric installation and for a rotation speed corresponding to the speed of synchronization with the frequency of a power network.

  14. 75 FR 48322 - McCloud-Pit Project; Notice of Availability of the Draft Environmental Impact Statement for the...

    Science.gov (United States)

    2010-08-10

    ... Energy Regulatory Commission McCloud-Pit Project; Notice of Availability of the Draft Environmental Impact Statement for the McCloud-Pit Hydroelectric Project and Intention To Hold Public Meetings July 30...-Pit Hydroelectric Project (FERC No. 2106), located on the McCloud and Pit Rivers in Shasta County...

  15. An estimation of the capacity to produce hydrogen by wasted hydroelectric energy for the three largest Brazilian hydroelectric

    Energy Technology Data Exchange (ETDEWEB)

    Padilha, Janine C.; Trindade, Leticia G. da; Souza, Roberto F. de [Universidade Federal do Rio Grande do Sul (UFRGS), Porto Alegre, RS (Brazil). Inst. of Chemistry], Email: janine@iq.ufrgs.br; Miguel, Marcelo [Itaipu Binacional, Foz do Iguacu, PR (Brazil)

    2010-07-01

    The use of water wasted in hydroelectric plants as normalization dam excess, which constitute a hydrodynamic potential useful to generate electric energy which can be subsequently used to produce hydrogen and its subsequent consumption in fuel cells has been considered as an alternative for hydraulic energy-rich countries like Brazil. The case is examined in which all the water wasted in the hydroelectric plants, spilled by dam gates to maintain acceptable water levels, from the 3 largest Brazilian hydroelectric plants was used to produce hydrogen. During the year of 2008, the electric energy produced from this utilization would have been equivalent to 52.8 TWh, an amount that corresponds to an increase of ca. 15% of the total electric energy produced in the country. Furthermore, if this amount of hydrogen was used in the replacement of internal combustion vehicles by fuel cells, this would have prevented the production of 2.26 x 10{sup 7} ton of Co{sub 2} per year. This plan would also significantly decrease production and release of greenhouse gases. (author)

  16. Wildlife and Wildlife Habitat Loss Assessment Summary at Federal Hydroelectric Facilities; Willamette River Basin, 1985 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, J.H.

    1986-02-01

    Habitat based assessments were conducted of the US Army Corps of Engineers' hydroelectric projects in the Willamette River Basin, Oregon, to determine losses or gains to wildlife and/or wildlife habitat resulting from the development and operation of the hydroelectric-related components of the facilities. Preconstruction, postconstruction, and recent vegetation cover types at the project sites were mapped based on aerial photographs. Vegetation cover types were identified within the affected areas and acreages of each type at each period were determined. Wildlife target species were selected to represent a cross-section of species groups affected by the projects. An interagency team evaluated the suitability of the habitat to support the target species at each project for each time period. An evaluation procedure which accounted for both the quantity and quality of habitat was used to aid in assessing impacts resulting from the projects. The Willamette projects extensively altered or affected 33,407 acres of land and river in the McKenzie, Middle Fork Willamette, and Santiam river drainages. Impacts to wildlife centered around the loss of 5184 acres of old-growth conifer forest, and 2850 acres of riparian hardwood and shrub cover types. Impacts resulting from the Willamette projects included the loss of critical winter range for black-tailed deer and Roosevelt elk, and the loss of year-round habitat for deer, upland game birds, furbearers, spotted owls, pileated woodpeckers, and many other wildlife species. Bald eagles and ospreys were benefited by an increase in foraging habitat. The potential of the affected areas to support wildlife was greatly altered as a result of the Willamette projects. Losses or gains in the potential of the habitat to support wildlife will exist over the lives of the projects. Cumulative or system-wide impacts of the Willamette projects were not quantitatively assessed.

  17. The role of thrust faulting in the formation of the eastern Alaska Range: Thermochronological constraints from the Susitna Glacier Thrust Fault region of the intracontinental strike-slip Denali Fault system

    Science.gov (United States)

    Riccio, Steven J.; Fitzgerald, Paul G.; Benowitz, Jeff A.; Roeske, Sarah M.

    2014-11-01

    Horizontal-slip along restraining bends of strike-slip faults is often partitioned into a vertical component via splay faults. The active Susitna Glacier Thrust Fault (SGTF), as shown by its initiation of the 2002 M7.9 Denali Fault earthquake, lies south of, and intersects the dextral strike-slip Denali Fault. Geochronology and thermochronology data from samples across the SGTF constrain the region's tectonic history and the role of thrusting in the formation of the eastern Alaska Range south of the Denali fault. U-Pb zircon ages indicate intrusion of plutons in the footwall (~57 Ma) and hanging wall (~98 Ma). These U-Pb zircon ages correlate to those from the Ruby Batholith/Kluane Terrane ~400 km east along the Denali Fault, supporting geologic correlations and hence constraints on long-term slip rates. 40Ar/39Ar mica and K-feldspar data from footwall and hanging wall samples (~54 to ~46 Ma) reflect cooling following magmatism and/or regional Eocene metamorphism related to ridge subduction. Combined with apatite fission track data (ages 43-28 Ma) and thermal models, both sides of the SGTF acted as a coherent block during the Eocene and early Oligocene. Contrasting apatite (U-Th)/He ages across the Susitna Glacier (~25 Ma footwall, ~15 Ma hanging wall) suggest initiation of faulting during the middle Miocene. Episodic cooling and exhumation is related to thrusting on known or hypothesized faults that progressively activate due to varying partition of strain along the Denali Fault associated with changing kinematics and plate interaction (Yakutat microplate collision, flat-slab subduction and relative plate motion change) at the southern Alaskan plate margin.

  18. Case study analysis of legal and institutional obstacles and incentives to the development of the hydroelectric potential at Goose River, Maine

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The case study is an analysis of the legal, institutional, and financial incentives and obstacles to the development of the hydroelectric potential on the Goose River in Maine. The Goose River project concerns development by a private developer, Maine Hydro-Electric Development Corporation. The project is comprised of a five-dam system, with the first dam located at Swan Lake and the fifth dam about one mile from the sea. It will utilize the 7500 acre-feet of storage capacity of Swan Lake to run the four downstream power stations. The system is designed to generate 430 kWs of total capacity which would be sold to Central Maine Power, the local investor-owned public utility.

  19. An Adaptive Multivariable Control System for Hydroelectric Generating Units

    Directory of Open Access Journals (Sweden)

    Gunne J. Hegglid

    1983-04-01

    Full Text Available This paper describes an adaptive multivariable control system for hydroelectric generating units. The system is based on a detailed mathematical model of the synchronous generator, the water turbine, the exiter system and turbine control servo. The models of the water penstock and the connected power system are static. These assumptions are not considered crucial. The system uses a Kalman filter for optimal estimation of the state variables and the parameters of the electric grid equivalent. The multivariable control law is computed from a Riccatti equation and is made adaptive to the generators running condition by means of a least square technique.

  20. 77 FR 24949 - Red River Lock & Dam No. 4 Hydroelectric Project; BOST4 Hydroelectric LLC; Notice of Proposed...

    Science.gov (United States)

    2012-04-26

    ... Department Dr. Linda Langley, Coushatta of Culture, Recreation & Tourism, P.O. Tribe of Louisiana, P.O. Box... Tomlinson or Louisiana Department of Culture, Representative, U.S. Army Recreation & Tourism, P.O. Box 44247...

  1. Assessment of the feasibility of recommissioning the French Landing Hydroelectric Facility in Van Buren Township, Michigan. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-02-01

    The results of a study of the feasibility of recommissioning a small, low-head hydroelectric facility in southeastern Michigan are presented. The study concludes that there are several cost-effective designs for recommissioning the site, based on the use of vertical turbines and the sale of power to nearby industrial markets. In terms of the bulk sale of power to the local electric utility, no cost-effective alternatives were found to exist. A major burden on project cost-effectiveness was found to be the relatively large costs for structural repairs to the dam and powerhouse needed to insure safe operation and on adequate service life. From an engineering standpoint it was found that the items of equipment needed to recommission the site are readily available from both US and foreign manufacturers. A variety of hydraulic turbine designs could be successfully adapted to the existing powerhouse, without extensive new construction. It was determined that the production capacity of the facility had an important influence on the cost-effectiveness of the project. A detailed benefit/cost analysis was conducted to identify the optimum facility size in terms of incremental costs and revenues. A detailed environmental assessment using an impact matrix methodology concluded that the development of the facility for hydroelectric generation would have important positive environmental consequences related to improved impoundment and flow management techniques as well as enhanced public safety due to structural repairs to the dam. The institutional and regulatory implications of developing the site for hydroelectric generation were found to be significant but manageable.

  2. Cost basis for hydroelectric power plants. Price level of 01.01.1995; Kostnadsgrunnlag for vannkraftanlegg. Prisnivaa pr 01.01.1995

    Energy Technology Data Exchange (ETDEWEB)

    Stensby, H.; Slapgaard, J.

    1995-08-01

    This publication provides a basis for calculation of expected average construction costs and equipment costs for large hydroelectric power plants in Norway. The publication is not intended to be a tool for projecting with regard to optimization or choice of construction types, but should be useful at an early stage of planning. There is a supplementary publication (Publication no. 20/1995) for small plants. 80 figs., 12 tabs.

  3. Integrated environmental action plan for Furnas hydroelectric power plant reservoir and adjacent cities; Plano de acao ambiental integrada do reservatorio da Usina de Furnas e municipios lindeiros

    Energy Technology Data Exchange (ETDEWEB)

    Taam, Mauricio; Barbosa, Jose Roberto; Costa, Vivaldi Goncalves; Vieira, Jose Henrique; Fonseca, Joao Bosco R.; Dinelli, Ricardo [FURNAS Centrais Eletricas S.A., Rio de Janeiro, RJ (Brazil)

    1995-12-31

    This work concerns the integrated environmental action plan - Furnas project, which represents a new philosophy for dealing with environmental issues concerning undertakings in operation. The area of influence of the Furnas hydroelectric power plant reservoir is described and the consequences of the urban and agricultural accelerated growth considering environmental aspects are discussed. Solutions pointing at reforestation and recuperation of eroding areas are suggested 3 refs., 2 figs., 1 tab.

  4. Proliferation of Hydroelectric Dams in the Andean Amazon and Implications for Andes-Amazon Connectivity

    Science.gov (United States)

    Finer, Matt; Jenkins, Clinton N.

    2012-01-01

    Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1) There is a critical need for further strategic regional and basin scale evaluation of dams. 2) There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3) Reconsideration of hydropower as a low-impact energy source in the Neotropics. PMID:22529979

  5. Turbulence at Hydroelectric Power Plants and its Potential Effects on Fish.

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F.; Odeh, Mufeed

    2001-01-01

    The fundamental influence of fluid dynamics on aquatic organisms is receiving increasing attention among aquatic ecologists. For example, the importance of turbulence to ocean plankton has long been a subject of investigation (Peters and Redondo 1997). More recently, studies have begun to emerge that explicitly consider the effects of shear and turbulence on freshwater invertebrates (Statzner et al. 1988; Hart et al. 1996) and fishes (Pavlov et al. 1994, 1995). Hydraulic shear stress and turbulence are interdependent natural fluid phenomena that are important to fish, and consequently it is important to develop an understanding of how fish sense, react to, and perhaps utilize these phenomena under normal river flows. The appropriate reaction to turbulence may promote movement of migratory fish or prevent displacement of resident fish. It has been suggested that one of the adverse effects of flow regulation by hydroelectric projects is the reduction of normal turbulence, particularly in the headwaters of reservoirs, which can lead to disorientation and slowing of migration (Williams et al. 1996; Coutant et al. 1997; Coutant 1998). On the other hand, greatly elevated levels of shear and turbulence may be injurious to fish; injuries can range from removal of the mucous layer on the body surface to descaling to torn opercula, popped eyes, and decapitation (Neitzel et al. 2000a,b). Damaging levels of fluid stress can occur in a variety of circumstances in both natural and man-made environments. This paper discusses the effects of shear stress and turbulence on fish, with an emphasis on potentially damaging levels in man-made environments. It defines these phenomena, describes studies that have been conducted to understand their effects, and identifies gaps in our knowledge. In particular, this report reviews the available information on the levels of turbulence that can occur within hydroelectric power plants, and the associated biological effects. The final section

  6. Proliferation of hydroelectric dams in the Andean Amazon and implications for Andes-Amazon connectivity.

    Directory of Open Access Journals (Sweden)

    Matt Finer

    Full Text Available Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1 There is a critical need for further strategic regional and basin scale evaluation of dams. 2 There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3 Reconsideration of hydropower as a low-impact energy source in the Neotropics.

  7. Energy harvesting from hydroelectric systems for remote sensors

    Directory of Open Access Journals (Sweden)

    Joaquim Azevedo

    2016-10-01

    Full Text Available Hydroelectric systems are well-known for large scale power generation. However, there are virtually no studies on energy harvesting with these systems to produce tens or hundreds of milliwatts. The goal of this work was to study which design parameters from large-scale systems can be applied to small-scale systems. Two types of hydro turbines were evaluated. The first one was a Pelton turbine which is suitable for high heads and low flow rates. The second one was a propeller turbine used for low heads and high flow rates. Several turbine geometries and nozzle diameters were tested for the Pelton system. For the propeller, a three-bladed turbine was tested for different heads and draft tubes. The mechanical power provided by these turbines was measured to evaluate the range of efficiencies of these systems. A small three-phase generator was developed for coupling with the turbines in order to evaluate the generated electric power. Selected turbines were used to test battery charging with hydroelectric systems and a comparison between several efficiencies of the systems was made.

  8. Framework of systematic sustainability assessment strategy (FSSAS) for hydroelectric power industry in Malaysia

    Science.gov (United States)

    Johan, Kartina; Turan, Faiz Mohd

    2017-08-01

    Hydroelectric power is an alternative power resource in Malaysia and always associated with negative impact on environmental, social and economy of the surrounding site. The dispute over environmental, societal and economic issues can be minimised if compliance to sustainability development requirement is included in the project as part of the project premises during planning phase. This paper suggests a framework targeted for decision-makers in charge of implementing the projects to produce hydropower the sustainable way in Malaysian context which can mitigate the risks in social, environment and economy. The framework is strategic in nature and based on project management methodology with objective to provide a ‘common language’ by having a project value as measureable for stakeholders to state their mutual agreement of what a sustainable hydropower project in the context of Malaysia and in line with the United Nations (UN) 17 Sustainable Development Goals (SDGs). The paper discusses how the proposed systematic sustainability assessment strategy (FSSAS) framework support the call for Malaysia to promote meaningful public participation in ensuring land and natural resource decisions and to address citizens’ interests which is the core idea of Environmental Democracy Index established in 2014. The paper argues that, even though it is at present impossible to define precision status of sustainability development with respect to the nature of the multi stakeholders and the lack of systematic assessment the proposed FSSAS framework can be a valuable tool because it tracks the project value as a quantitative deliverable to determine the status of the journey in sustainable development towards accomplishing the SDG under a consensus in hydropower industry of any scale over time.

  9. 76 FR 51027 - F&B Wood Corporation; Milltown Hydroelectric LLC.; Notice of Transfer of Exemption

    Science.gov (United States)

    2011-08-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission F&B Wood Corporation; Milltown Hydroelectric LLC.; Notice of Transfer of Exemption 1. Pursuant to section 4.106(i) of the Commission's regulations,\\1\\ F&B Wood Corporation, exemptee for the Corriveau Hydroelectric...

  10. Analysis of environmental issues related to small-scale hydroelectric development. VI. Dissolved oxygen concentrations below operating dams

    Energy Technology Data Exchange (ETDEWEB)

    Cada, G.F.; Kumar, K.D.; Solomon, J.A.; Hildebrand, S.G.

    1982-01-01

    Results are presented of an effort aimed at determining whether or not water quality degradation, as exemplified by dissolved oxygen concentrations, is a potentially significant issue affecting small-scale hydropower development in the US. The approach was to pair operating hydroelectric sites of all sizes with dissolved oxygen measurements from nearby downstream US Geological Survey water quality stations (acquired from the WATSTORE data base). The USGS data were used to calculate probabilities of non-compliance (PNCs), i.e., the probabilities that dissolved oxygen concentrations in the discharge waters of operating hydroelectric dams will drop below 5 mg/l. PNCs were estimated for each site, season (summer vs remaining months), and capacity category (less than or equal to 30 MW vs >30 MW). Because of the low numbers of usable sites in many states, much of the subsequent analysis was conducted on a regional basis. During the winter months (November through June) all regions had low mean PNCs regardless of capacity. Most regions had higher mean PNCs in summer than in winter, and summer PNCs were greater for large-scale than for small-scale sites. Among regions, the highest mean summer PNCs were found in the Great Basin, the Southeast, and the Ohio Valley. To obtain a more comprehensive picture of the effects of season and capacity on potential dissolved oxygen problems, cumulative probability distributions of PNC were developed for selected regions. This analysis indicates that low dissolved oxygen concentrations in the tailwaters below operating hydroelectric projects are a problem largely confined to large-scale facilities.

  11. Analysis of environmental issues related to small scale hydroelectric development. II. Design considerations for passing fish upstream around dams. Environmental Sciences Division Publication No. 1567

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrand, S.G. (ed.)

    1980-08-01

    The possible requirement of facilities to move migrating fish upstream around dams may be a factor in determining the feasibility of retrofitting small dams for hydroelectric generation. Basic design considerations are reported that should be evaluated on a site-specific basis if upstream fish passage facilities are being considered for a small scale hydroelectric project (defined as an existing dam that can be retrofitted to generate 25 MW or less). Information on general life history and geographic distribution of fish species that may require passage is presented. Biological factors important in the design of upstream passage facilities are discussed: gas bubble disease, fish swimming speed, oxygen consumption by fish, and diel and photo behavior. Three general types of facilities (fishways, fish locks, and fish lifts) appropriate for upstream fish passage at small scale hydroelectric projects are described, and size dimensions are presented. General design criteria for these facilities (including fish swimming ability and behavior) and general location of facilities at a site are discussed. Basic cost considerations for each type of passage facility, including unit cost, operation and maintenance costs, and costs for supplying attraction water, are indicated.

  12. Greenhouse gas emissions from Brazil’s Amazonian hydroelectric dams

    Science.gov (United States)

    Fearnside, Philip M.

    2016-01-01

    Tropical dams are often falsely portrayed as ‘clean’ emissions-free energy sources. The letter by de Faria et al (2015 Environ. Res. Lett. 10 124019) adds to evidence questioning this myth. Calculations are made for 18 dams that are planned or under construction in Brazilian Amazonia and show that emissions from storage hydroelectric dams would exceed those from electricity generation based on fossil fuels. Fossil fuels need not be the alternative, because Brazil has vast potential for wind and solar power as well as opportunities for energy conservation. Because dam-building is rapidly shifting to humid tropical areas, where emissions are higher than in other climatic zones, the impact of these emissions needs to be given proper weight in energy-policy decisions.

  13. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 1. Pacific Northwest region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The preliminary inventory and analysis procedures provide a comprehensive assessment of the undeveloped hydroelectric power potential in the US and determines which sites merit more thorough investigation. Over 5400 existing structures have been identified as having the physical potential to add hydropower plants or increase hydropower output thereby increasing our present hydropower capacity from a total of 64,000 MW to 158,000 MW and our energy from 280,000 GWH to 503,000 GWH. While the physical potential for this increase is clearly available, some of these projects will undoubtedly not satisfy more-detailed economic analysis as well as the institutional and environmental criteria which will be imposed upon them. Summary tables include estimates of the potential capacity and energy at each site in the inventory. In some cases, individual projects may be site alternatives to others in the same general location, when only one can be considered for hydropower development. The number of sites per state is identified, but specific information is included for only the sites in Alaska, Idaho, Oregon, and Washington in this first volume.

  14. Woodruff Narrows low head hydroelectric power plant feasibility determination

    Energy Technology Data Exchange (ETDEWEB)

    1979-03-01

    Woodruff Narrows Reservoir, owned by the State of Utah, was built in 1961 as an irrigation reservoir. The reservoir outlet works and spillway are in need of repair, and plans have been made to enlarge the reservoir from its present capacity of 28,000 acre-feet to 53,200 acre-feet when these repairs are made. The purpose of this study was to determine if it is feasible to add hydropower facilities when the reservoir is repaired and enlarged. A computer simulation model based on mean monthly values, utilizing 26 years of recorded streamflow into the reservoir, was used to determine the mean annual energy potential for the following configurations: (1) present dam, (2) the proposed enlarged dam, (3) a new dam at the lower site with a maximum head of 65 feet, and (4) a new dam at the lower site which would store water to the same elevation as the proposed enlarged dam. Results of the simulation study show that maximum power capacities are respectively 2.1, 3.0, 3.9, and 4.5 megawatts. The marketing potential for this electric power, cost estimates and financial analysis, and environmental, social, and regulatory aspects of the proposed hydropower facilities were evaluated. The results showed the addition of hydroelectric power development at the Woodruff Narrows site would have minimal social and environmental effects on the area, would result in little or no changes in the present patterns of water and land use, income, population, and employment and would not result in any significant changes of the social structure or characteristics of the area. However, hydroelectric power development at the Woodruff Narrows site is not economically feasible at the present time. (LCL)

  15. Feasibility study for Boardman River hydroelectric power. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-02-22

    The feasibility of generating additional hydroelectric power from five consecutive existing dams located on the Boardman River in Grand Traverse County and Traverse City, Michigan, was investigated. The potential hydropower production capabilities, in terms of base load power and peak load power, the legal-institutional-environmental constraints, and the economic feasibility, including capital investment, operating costs and maintenance costs, were evaluated for each of the five dam sites individually and as a series of co-dependent facilities. The impact of installing fish passages at each site was analyzed separately. The feasibility assessment utilized the present worth analytical method, considering revenue based on thirty mills/kWh for power, 0.4% general economy escalation rate, and a 6% net income to the municipal utility. The sensitivity of fuel costs increasing at a different rate than the general price-escalation was tested by allowing the increase in fuel costs to vary from 3 to 8% per year. Assuming fuel costs increase at the same rate as the general economy, it is feasible to update, retrofit, renovate, and install hydroelectric generating capacity at Sabin, Boardman and Brown Bridge. Rehabilitation of Union Street and Keystone is also feasible but somewhat less attractive. Operating the dams as a co-dependent system has environmental advantages and can provide additional revenue through peak load power rates. A development plan to implement the above is outlined utilizing an ownership arrangement whereby Grand Traverse County provides easements for Sabin and Boardman Dams. The plan calls for operation of the system by Traverse City.

  16. Legal obstacles and incentives to the development of small scale hydroelectric power in New Jersey

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in New Jersey are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is discussed. New Jersey follows the riparian theory of water law. Following an extensive discussion of the New Jersey water law, New Jersey regulatory law and financial considerations regarding hydroelectric power development are discussed.

  17. Effect of time lag upon the economical operation of cascade hydroelectric power stations

    Energy Technology Data Exchange (ETDEWEB)

    Deng, X.

    1982-01-01

    In this paper we discretize the state parameter - flow of cascade hydroelectric power stations - into the step function of time variable, and use constrained nonlinear programming to establish a mathematical model of economical operation which is universally applicable for general cascade hydroelectic power stations, and then the primary factors which affect the value of the time lag are discussed. According to each case of different values of the time lag, the formulas for calculating the gradient of augmented objective functions and other important formulas which will be used in SUMT for optimization are derived. Furthermore, the functional relation between the time lag and the state of operation of cascade hydroelectric power stations is derived. The situations in which the time lag will cause the mutual relation between hydroelectric power stations to change were studied. Finally, the affect that time lag will have on the economical operation of cascade hydroelectric power stations is discussed.

  18. [Impacts of hydroelectric cascade exploitation on river ecosystem and landscape: a review].

    Science.gov (United States)

    Yang, Kun; Deng, Xi; Li, Xue-Ling; Wen, Ping

    2011-05-01

    Hydroelectric cascade exploitation, one of the major ways for exploiting water resources and developing hydropower, not only satisfies the needs of various national economic sectors, but also promotes the socio-economic sustainable development of river basin. unavoidable anthropogenic impacts on the entire basin ecosystem. Based on the process of hydroelectric cascade exploitation and the ecological characteristics of river basins, this paper reviewed the major impacts of hydroelectric cascade exploitation on dam-area ecosystems, river reservoirs micro-climate, riparian ecosystems, river aquatic ecosystems, wetlands, and river landscapes. Some prospects for future research were offered, e.g., strengthening the research of chain reactions and cumulative effects of ecological factors affected by hydroelectric cascade exploitation, intensifying the study of positive and negative ecological effects under the dam networks and their joint operations, and improving the research of successional development and stability of basin ecosystems at different temporal and spatial scales.

  19. Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

    1981-04-01

    This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

  20. State of the arch dam and foundation of the Inguri Hydroelectric Station

    Energy Technology Data Exchange (ETDEWEB)

    Bronshtein, V.I.

    1994-08-01

    The Inguri hydroelectric station (HES) is a cascade of hydroelectric stations including, in addition to the dam - diversion installation of the Inguri HES proper, the near-dam installation of the Perepad HES-1 and three similar channel installations of the Perepad HESs-2, -3, and -4 located on the tailrace emptying into the Black Sea. The HESs of the cascade use the fall of two rivers, the Inguri and Eristskali, by diverting the waters of the Inguri into the Eristskali.

  1. Small-scale hydroelectric power in the southeast: new impetus for an old energy source

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    The Southeastern conference, Small-Scale Hydroelectric Power: New Impetus for an Old Energy Source, was convened to provide a forum for state legislators and other interested persons to discuss the problems facing small-scale hydro developers, and to recommend appropriate solutions to resolve those problems. During the two-day meeting state legislators and their staffs, along with dam developers, utility and industry representatives, environmentalists and federal/state officials examined and discussed the problems impeding small-scale hydro development at the state level. Based upon the problem-oriented discussions, alternative policy options were recommended for consideration by the US Department of Energy, state legislatures and the staff of the National Conference of State Legislatures (NCSL). Emphasis was placed on the legal, institutional, environmental and economic barriers at the state level, as well as the federal delays associated with licensing small-scale hydro projects. Whereas other previously held conferences have emphasized the identification and technology of small-scale hydro as an alternative energy source, this conference stressed legislative resolution of the problems and delays in small-scale hydro licensing and development. Panel discussions and workshops are summarized. Papers on the environmental, economic, and legal aspects of small-scale hydropower development are presented. (LCL)

  2. Development of an HTS hydroelectric power generator for the hirschaid power station

    Energy Technology Data Exchange (ETDEWEB)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin, E-mail: ruben.fair@converteam.co [Advanced Technology Group, Converteam, Rugby, CV21 1BD (United Kingdom)

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  3. Prediction of Francis Turbine Prototype Part Load Pressure and Output Power Fluctuations with Hydroelectric Model

    Science.gov (United States)

    Alligné, S.; Nicolet, C.; Béguin, A.; Landry, C.; Gomes, J.; Avellan, F.

    2017-04-01

    The prediction of pressure and output power fluctuations amplitudes on Francis turbine prototype is a challenge for hydro-equipment industry since it is subjected to guarantees to ensure smooth and reliable operation of the hydro units. The European FP7 research project Hyperbole aims to setup a methodology to transpose the pressure fluctuations induced by the cavitation vortex rope from the reduced scale model to the prototype generating units. A Francis turbine unit of 444MW with a specific speed value of ν = 0.29, is considered as case study. A SIMSEN model of the power station including electrical system, controllers, rotating train and hydraulic system with transposed draft tube excitation sources is setup. Based on this model, a frequency analysis of the hydroelectric system is performed for all technologies to analyse potential interactions between hydraulic excitation sources and electrical components. Three technologies have been compared: the classical fixed speed configuration with Synchronous Machine (SM) and the two variable speed technologies which are Doubly Fed Induction Machine (DFIM) and Full Size Frequency Converter (FSFC).

  4. Hydroelectricity, land use and water managing; Hidroelectricidad, uso del suelo y manejo del agua

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez Canet, Lourdes [Proyectos Geotermoelectricos, Aplica, S. A., Mexico, D. F. (Mexico)

    1997-12-31

    This document deals with the importance of determining the vocation of the geographic site where it is pretended to execute a hydroelectric project, since it is necessary to asses various alternative sites, in order to select the most appropriate, where the environmental impacts be less, without forgetting for a minute the ecological criteria for its final selection. Unfortunately there are not environmental studies of periodic continuation departing from the commissioning of a dam, since this studies would permit to know the real environmental impacts in order to solve them later [Espanol] Este documento trata la importancia de determinar la vocacion del lugar geografico donde se pretende llevar a cabo un proyecto hidroelectrico, ya que es necesario evaluar diversos lugares alternativos, con objeto de elegir el mejor, donde los impactos ambientales sean menores, sin olvidar en ningun momento los criterios ecologicos para su eleccion definitiva. Lamentablemente no hay estudios ambientales de seguimiento periodicos a partir de que una presa se encuentre en operacion, ya que estos estudios permitirian conocer realmente los impactos ambientales para poder solucionarlos posteriormente

  5. Feasibility determination of hydroelectric power generation at Patillas Reservoir, Puerto Rico. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Huetter, J.J. Jr.

    1979-02-01

    The overall feasibility of retrofit for hydroelectric power generation at the Patillas Reservoir, an existing impoundment located near the town of Patillas, Puerto Rico, was studied. The scope of work and project intent is limited to establishing valid acceptance or non-acceptance criteria for this specific site as an example of power generation potential at existing dams of relatively low head (less than or equal to 20 m) in the United States. Information is included on hydrologic conditions at the site, retrofit plant design, economic analysis, environmental, legal, social and institutional aspects, and availability of plant equipment. It is concluded that generation of hydropower at Patillas is entirely practical and uncomplicated from an engineering viewpoint, has no adverse environmental effects and is economically justifiable for the island of Puerto Rico. The final agency or contractor roles for development are reasonably well-established. There are no prohibitory laws or regulations concerning this development. In fact, according to Puerto Rico legislation, such hydropower developments appear to be mandated. The installed capacity of the site ranges from 665 kW to approximately 1500 kW depending on extent of development of the available options. (LCL)

  6. Behind an ambitious megaproject in Asia: The history and implications of the Bakun hydroelectric dam in Borneo

    Energy Technology Data Exchange (ETDEWEB)

    Sovacool, Benjamin K., E-mail: bsovacool@nus.edu.sg [Lee Kuan Yew School of Public Policy, National University of Singapore, Oei Tiong Ham Building, 469C Bukit Timah Road, Singapore 259772 (Singapore); Bulan, L.C. [Lee Kuan Yew School of Public Policy, National University of Singapore, Oei Tiong Ham Building, 469C Bukit Timah Road, Singapore 259772 (Singapore)

    2011-09-15

    Using a case-study, inductive, narrative approach, this article explores the history, drivers, benefits, and barriers to the Bakun Hydroelectric Project in East Malaysia. Situated on the island of Borneo, Bakun Dam is a 204 m high concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. Bakun Dam and its affiliated infrastructure could be the single largest and most expensive energy project ever undertaken in Southeast Asia. Based on data collected through site visits, original field research in Sarawak, and more than 80 research interviews, the article begins by teasing out the complex history and drivers behind the Bakun project before identifying a set of potential social, political, and economic benefits the project could deliver. It then delves into six sets of barriers in the technical, economic, political, legal and regulatory, social, and environmental realms. We find that Bakun illustrates how centralized energy megaprojects, while ostensibly championed for reasons of economies of scale and the ability to bring about transformational change in the shortest period of time, often fail to address broader development goals such as fighting energy poverty and improving the livelihoods of the local communities they are supposed to serve. - Highlights: > Bakun Dam is concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. > The project faces technical, economic, political, legal and regulatory, social, and environmental barriers. > We conclude the project will fail to fight energy poverty or improve the livelihoods of local populations.

  7. Influence of environmental factors on mercury release in hydroelectric reservoirs

    Energy Technology Data Exchange (ETDEWEB)

    Morrison, K.; Therien, N.

    1991-04-01

    Due to increased mercury concentrations in fish in hydro-electric reservoirs after flooding, a study was carried out to evaluate the release and transformation of mercury due to vegetation and soil flooded as a result of reservoir creation. Samples of vegetation and soils were immersed in water and concentrations of total mercury, methylmercury and nutrients were followed. The effects of anoxia, pH and temperature on release and transformation were examined. An existing dynamic model of decomposition of flooded materials in reservoirs was modified to include mercury release and transformation, and was calibrated to the experimental data. Amounts of mercury released by the different substrates was of the same order of magnitude. Tree species contributed to the greatest amounts of methylmercury per unit biomass, but the biomass used for these was twigs and foliage. Soil released significant amounts of mercury, but methylation was very low. The model was able to fit well for all substrates except lichen. The model can be adapted to proposed reservoirs to predict nutrient and mecury release and transformation. 175 refs., 38 figs., 38 tabs.

  8. Hydroelectric power plant with variable flow on drinking water adduction

    Science.gov (United States)

    Deaconu, S. I.; Babău, R.; Popa, G. N.; Gherman, P. L.

    2018-01-01

    The water feeding system of the urban and rural localities is mainly collected with feed pipes which can have different lengths and different levels. Before using, water must be treated. Since the treatment take place in the tanks, the pressure in the inlet of the station must be diminished. Many times the pressure must be reduced with 5-15 Barr and this is possible using valves, cavils, and so on. The flow capacity of the water consumption is highly fluctuating during one day, depending on the season, etc. This paper presents a method to use the hydroelectric potential of the feed pipes using a hydraulic turbine instead of the classical methods for decreasing the pressure. To avoid the dissipation of water and a good behavior of the power parameters it is used an asynchronous generator (AG) which is coupled at the electrical distribution network through a static frequency converter (SFC). The turbine has a simple structure without the classical devices (used to regulate the turbine blades). The speed of rotation is variable, depending on the necessary flow capacity in the outlet of the treatment station. The most important element of the automation is the static frequency converter (SFC) which allows speeds between 0 and 1.5 of the rated speed of rotation and the flow capacity varies accordingly with it.

  9. Counter rotating type hydroelectric unit suitable for tidal power station

    Energy Technology Data Exchange (ETDEWEB)

    Kanemoto, T [Faculty of Engineering, Kyushu Institute of Technology, Sensui 1-1, Tobata, Kitakyushu 804-8550 (Japan); Suzuki, T, E-mail: turbo@tobata.isc.kyutech.ac.j [Graduate School of Engineering, Kyushu Institute of Technology, Sensui 1-1, Tobata, Kitakyushu 804-8550 (Japan)

    2010-08-15

    The counter rotating type hydroelectric unit, which is composed of the axial flow type tandem runners and the peculiar generator with double rotational armatures,was proposed to utilize effectively the tidal power. In the unit, the front and the rear runners counter drive the inner and the outer armatures of the generator, respectively. Besides, the flow direction at the rear runner outlet must coincide with the flow direction at the front runner inlet, because the angular momentum through the rear runner must coincides with that through the front runner. That is, the flow runs in the axial direction at the rear runner outlet while the axial inflow at the front runner inlet. Such operations are suitable for working at the seashore with rising and falling tidal flows, and the unit may be able to take place of the traditional bulb type turbines. The tandem runners were operated at the on-cam conditions, in keeping the induced frequency constant. The output and the hydraulic efficiency are affected by the adjustment of the front and the blade setting angles. The both optimum angles giving the maximum output and/or efficiency were presented at the various discharges/heads. To promote more the tidal power generation by this type unit, the runners were also modified so as to be suitable for both rising and falling flows. The hydraulic performances are acceptable while the output is determined mainly by the trailing edge profiles of the runner blades.

  10. Culinary and pressure irrigation water system hydroelectric generation

    Energy Technology Data Exchange (ETDEWEB)

    Christiansen, Cory [Water Works Engineers, Pleasant Grove City, UT (United States)

    2016-01-29

    Pleasant Grove City owns and operates a drinking water system that included pressure reducing stations (PRVs) in various locations and flow conditions. Several of these station are suitable for power generation. The City evaluated their system to identify opportunities for power generation that can be implemented based on the analysis of costs and prediction of power generation and associated revenue. The evaluation led to the selection of the Battle Creek site for development of a hydro-electric power generating system. The Battle Creek site includes a pipeline that carries spring water to storage tanks. The system utilizes a PRV to reduce pressure before the water is introduced into the tanks. The evaluation recommended that the PRV at this location be replaced with a turbine for the generation of electricity. The system will be connected to the utility power grid for use in the community. A pelton turbine was selected for the site, and a turbine building and piping system were constructed to complete a fully functional power generation system. It is anticipated that the system will generate approximately 440,000 kW-hr per year resulting in $40,000 of annual revenue.

  11. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development V: Instream Flow Needs for Fishery Resources

    Energy Technology Data Exchange (ETDEWEB)

    Loar, James M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sale, Michael J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    1981-10-01

    The purpose of this document is to provide guidance to developers of small-scale hydroelectric projects on the assessment of instream flow needs. While numerous methods have been developed to assess the effects of stream flow regulation on aquatic biota in coldwater streams in the West, no consensus has been reached regarding their general applicability, especially to streams in the eastern United States. This report presents and reviews these methods (Section 2.0), which is intended to provide the reader with general background information that is the basis for the critical evaluation of the methods (Section 3.0). The strategy for instream flow assessment presented in Section 4.0 is, in turn, based on the implicit assumptions, data needs, costs, and decision-making capabilities of the various methods as discussed in Section 3.0.

  12. A system for environmental monitoring of hydroelectric reservoirs in Brazil

    Directory of Open Access Journals (Sweden)

    Arley Souza

    2013-04-01

    Full Text Available Environmental monitoring of aquatic systems is an important tool to support policy makers and environmental managers’ decisions. Long-term, continuous collection of environmental data is fundamental to the understanding of an aquatic system. This paper aims to present the integrated system for environmental monitoring (SIMA, a long-term temporal series system with a web-based archive for limnological and meteorological data. The following environmental parameters are measured by SIMA: chlorophyll-a ( , water surface temperature (ºC, water column temperature by a thermistor string (ºC, turbidity (NTU, pH, dissolved oxygen concentration (mg L-1, electric conductivity (µS cm-1, wind speed (ms-1 and direction (º, relative humidity (%, shortwave radiation (Wm-2 and barometric pressure (hPa. The data were collected in a preprogrammed time interval (1 hour and were transmitted by satellite in quasi-real time for any user within 2500 km of the acquisition point. So far, 11 hydroelectric reservoirs are being monitored with the SIMA buoy. Basic statistics (mean and standard deviation and an example of the temporal series of some parameters were displayed at a database with web access. However, sensor and satellite problems occurred due to the high data acquisition frequency. Sensors problems occurred due to the environmental characteristics of each aquatic system. Water quality sensors rapidly degrade in acidic waters, rendering the collected data invalid. Data is also rendered invalid when sensors become infested with periphyton. Problems occur with the satellites’ reception of system data when satellites pass over the buoy antenna. However, the data transfer at some inland locations was not completed due to the satellite constellation position. Nevertheless, the integrated system of water quality and meteorological parameters is an important tool in understanding the aquatic system dynamic. It can also be used to create hydrodynamics models of

  13. Project PAT (Pumps Working as Turbines)/IG (Induction Generators): a new concept for generation of electric power through micro scale hydroelectric power plants; Projeto BFT (Bombas Funcionado como Turbinas)/GI (Geradores de Inducao): um novo conceito para geracao de energia eletrica atraves de microcentrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Viana, Augusto Nelson Carvalho [Universidade Federal de Itajuba (UNIFEI), Itajuba, MG (Brazil). Inst. de Recursos Naturais. Programa de Pos-graduacao em Engenharia da Energia; Medeiros, Daniel de Macedo; Ricardo, Mateus [Universidade Federal de Itajuba (UNIFEI), Itajuba, MG (Brazil). Inst. de Recursos Naturais], Emails: augusto@unifei.edu.br, macedo@unifei.edu.br, mathidr@yahoo.com.br

    2006-07-01

    The present work has as objective to present the main bases of 'PAT/IG Project', accomplished in Boa Esperanca Farm (Delfim Moreira - MG), by an accord between Itajuba's Federal University and Mines and Energy Ministry. In a moment that the look for sustainable development is the law in Brazil, low costs and environmental impact alternatives must be prioritized. By this way, the PAT/IG Project continuous the Viana's (1987) works, that developed all Brazilian theoretical bases for using Pumps Working as Turbine (PAT). Besides that, the application of induction motors operating as induction generators will be evaluated, as the velocity control system of the PAT/IG group will be developed. The existing Boa Esperanca Farm's micro power plant will be rebuild ed, to receive a new generating group formed for a PAT and a IG, that will be used as natural sized test workbench of Itajuba's Federal University. At the ending of the project, there will be enough subsidies to prove, in practice, the feasibility presented in laboratorial tests by PAT/IG groups as conventional turbines replacer in micro powerplants. (author)

  14. A critical view on the eco-friendliness of small hydroelectric installations.

    Science.gov (United States)

    Premalatha, M; Tabassum-Abbasi; Abbasi, Tasneem; Abbasi, S A

    2014-05-15

    Renewable energy sources are widely perceived as 'clean', 'green', and 'inexhaustible'. In recent years the spectre of global warming and ocean acidification, which has been primarily attributed to fossil fuel burning, has brought renewable energy at the forefront of most climate change mitigation strategies. There is strong advocacy for large-scale substitution of conventional energy sources with the renewables on the premise that such a move would substantially reduce environmental degradation and global warming. These sentiments are being echoed by scientists and policy makers as well as environmental activists all over the world. 'Small hydro', which generally represents hydroelectric power projects of capacities 25 MW or lower, is one of the renewable energy options which is believed to be clean and sustainable even as its bigger version, large hydro, is known to cause several strongly adverse environmental impacts. This paper brings out that the prevailing perception of 'eco-friendliness' of small hydro is mainly due to the fact that it has only been used to a very small extent so far. But once it is deployed at a scale comparable to fossil fuel use, the resulting impacts would be quite substantially adverse. The purpose is not to denegrade small hydro, less so to advocate use of fossil fuels. It, rather, is to bring home the point that a much more realistic and elaborate assessment of the likely direct as well as indirect impacts of extensive utilization of this energy source than has been done hitherto is necessary. Copyright © 2013 Elsevier B.V. All rights reserved.

  15. Hydropower Projects

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-04-02

    The Water Power Program helps industry harness this renewable, emissions-free resource to generate environmentally sustainable and cost-effective electricity. Through support for public, private, and nonprofit efforts, the Water Power Program promotes the development, demonstration, and deployment of advanced hydropower devices and pumped storage hydropower applications. These technologies help capture energy stored by diversionary structures, increase the efficiency of hydroelectric generation, and use excess grid energy to replenish storage reserves for use during periods of peak electricity demand. In addition, the Water Power Program works to assess the potential extractable energy from domestic water resources to assist industry and government in planning for our nation’s energy future. From FY 2008 to FY 2014, DOE’s Water Power Program announced awards totaling approximately $62.5 million to 33 projects focused on hydropower. Table 1 provides a brief description of these projects.

  16. Multiple issues of a hydroelectric dam project in west Africa and integrated evaluation of human and environmental impacts; Pluralite des enjeux d'un projet de barrage en Afrique de l'Ouest et evaluation integree des impacts humains et environnementaux

    Energy Technology Data Exchange (ETDEWEB)

    Circe, M. [Tecsult Inc., Montreal, PQ (Canada)

    2007-07-01

    The energy and sustainable development plan of the Niger Government involves the construction of the Kandadji dam to regulate the flow of the Niger River and to produce electricity in order to meet the energy needs of the population. The Kandadji dam project is also considered a vital infrastructure investment to ensure water resources for irrigation purposes for food security and to improve health conditions in the Niger River valley. Niger's energy plan is intended to ensure environmental protection in the exploitation and consumption of energy resources, the promotion of new and renewable energy sources and access to energy by all citizens. An environmental impact assessment was conducted as part of the project feasibility study. This presentation highlighted the environmental problems that have affected the river in recent years which could possibly cause ecological and socio-economic problems in the short term, such as conservation of natural heritage. It was determined that there are no technical or geological challenges facing the construction of the Kandadji dam. A seismic study has established the safety of the proposed earth dam, which would be built using local material. 20 figs.

  17. Some environmental aspects of proposed hydro-electric schemes on the Zambezi River, Zimbabwe

    Energy Technology Data Exchange (ETDEWEB)

    Du Toit, R.F.

    1984-01-01

    Additional hydro-electric schemes on the Zambezi River, Zimbabwe, have been proposed to help meet that country's growing electricity demand. Preliminary environmental impact studies have shown that one of these schemes, at Mupata Gorge, poses a serious threat to the wilderness character and wildlife resources of the middle-Zambezi valley, while an alternative scheme, at Batoka gorge, would entail much less environmental cost. Likely impacts of these schemes on mammals, birds, fish, terrestrial and aquatic vegetation, human health and other environmental aspects are discussed. It is recommended that further environmental research on Zambezi hydro-electric schemes be carried out on an international basis.

  18. Legal obstacles and incentives to the development of small scale hydroelectric power in Pennsylvania

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Pennsylvania, there are 3 methods by which rights in water may be acquired: riparian ownership, prescription, and condemnation. These are discussed.

  19. Comparative analysis from hydroelectric generation versus natural gas; Analise comparativa da geracao eletrica hidrica versus gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Galvao, Luiz Claudio Ribeiro; Boarati, Julio Henrique; Shayani, Rafael Amaral; Udaeta, Miguel Edgar Morales [Sao Paulo Univ., SP (Brazil). Escola Politecnica. Dept. de Engenharia de Energia e Automacao Eletricas]. E-mail: udaeta@pea.usp.br

    1999-07-01

    The aim of the work was to present a comparative analysis between hydroelectric generation and natural gas based on integrated resource planning and sustainable development. The introduced comparative analysis considers the financial aspects; the appropriated technology; and the social, environmental and political factors. The hydroelectric option it showed more advantageous than the thermoelectric. This result was independent of the enterprise scale.

  20. The Application of Traits-Based Assessment Approaches to Estimate the Effects of Hydroelectric Turbine Passage on Fish Populations

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F [ORNL; Schweizer, Peter E [ORNL

    2012-04-01

    One of the most important environmental issues facing the hydropower industry is the adverse impact of hydroelectric projects on downstream fish passage. Fish that migrate long distances as part of their life cycle include not only important diadromous species (such as salmon, shads, and eels) but also strictly freshwater species. The hydropower reservoirs that downstream-moving fish encounter differ greatly from free-flowing rivers. Many of the environmental changes that occur in a reservoir (altered water temperature and transparency, decreased flow velocities, increased predation) can reduce survival. Upon reaching the dam, downstream-migrating fish may suffer increased mortality as they pass through the turbines, spillways and other bypasses, or turbulent tailraces. Downstream from the dam, insufficient environmental flow releases may slow downstream fish passage rates or decrease survival. There is a need to refine our understanding of the relative importance of causative factors that contribute to turbine passage mortality (e.g., strike, pressure changes, turbulence) so that turbine design efforts can focus on mitigating the most damaging components. Further, present knowledge of the effectiveness of turbine improvements is based on studies of only a few species (mainly salmon and American shad). These data may not be representative of turbine passage effects for the hundreds of other fish species that are susceptible to downstream passage at hydroelectric projects. For example, there are over 900 species of fish in the United States. In Brazil there are an estimated 3,000 freshwater fish species, of which 30% are believed to be migratory (Viana et al. 2011). Worldwide, there are some 14,000 freshwater fish species (Magurran 2009), of which significant numbers are susceptible to hydropower impacts. By comparison, in a compilation of fish entrainment and turbine survival studies from over 100 hydroelectric projects in the United States, Winchell et al. (2000

  1. Analysis of synchronous and induction generators used at hydroelectric power plant

    Science.gov (United States)

    Diniş, C. M.; Popa, G. N.; lagăr, A.

    2017-01-01

    In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.

  2. 76 FR 26718 - Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment

    Science.gov (United States)

    2011-05-09

    .../docs-filing/ecomment.asp . You must include your name and contact information at the end of your... Energy Regulatory Commission Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft... site at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket number excluding the last...

  3. 76 FR 76709 - Wilkesboro Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-12-08

    ... and contact information at the end of your comments. For assistance, please contact FERC Online...-003 North Carolina] Wilkesboro Hydroelectric Company, LLC; Notice of Availability of Environmental.... Enter the docket number excluding the last three digits in the docket number field to access the...

  4. Determining generator parameters of Camargos hydroelectric power plant through frequency response measurement

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Sebastiao E.M. de; Padua Guarini, Antonio de [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Souza, Joao A. de; Valgas, Helio M.; Pinto, Roberto del Giudice R. [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1994-12-31

    This work describes the results of the set frequency response tests performed in the generator number 2, 6.9 kV, 25 MVA, of Camargos hydroelectric power plant, CEMIG, and the parameters relatives to determined structures of model. This tests are unpublished in Brazil. (author) 7 refs., 16 figs., 7 tabs.

  5. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Science.gov (United States)

    2010-07-01

    ... power operations with power marketing agencies. 209.141 Section 209.141 Navigation and Navigable Waters... Coordination of hydroelectric power operations with power marketing agencies. (a) Purpose. This regulation... generating facilities with the power marketing agencies. (b) Applicability. This regulation applies to all...

  6. 76 FR 62802 - Fairlawn Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-10-11

    ... Energy Regulatory Commission Fairlawn Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory... assessment (EA). In the EA, Commission staff assess the potential environmental effects of licensing the...

  7. 76 FR 1148 - CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-01-07

    ... Energy Regulatory Commission CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental Assessment December 23, 2010. In accordance with the National Environmental Policy Act of 1969 and the..., Iowa, at the U.S. Army Corps of Engineers' Red Rock Dam. Staff prepared an environmental assessment (EA...

  8. 76 FR 12101 - Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment

    Science.gov (United States)

    2011-03-04

    ... Energy Regulatory Commission Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory... located on the Jackson River in Alleghany County, Virginia, and has prepared an Environmental Assessment...

  9. A Wildlife Habitat Protection, Mitigation and Enhancement Plan for Eight Federal Hydroelectric Facilities in the Willamette River Basin: Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Preston, S.K.

    1987-05-01

    The development and operation of eight federal hydroelectric projects in the Willamette River Basin impacted 30,776 acres of prime wildlife habitat. This study proposes mitigative measures for the losses to wildlife and wildlife habitat resulting from these projects, under the direction of the Columbia River Basin (CRB) Fish and Wildlife Program. The CRB Fish and Wildlife Program was adopted in 1982 by the Northwest Power Planning Council, pursuant to the Northwest Power Planning Act of 1980. The proposed mitigation plan is based on the findings of loss assessments completed in 1985, that used a modified Habitat Evaluation Procedure (HEP) to assess the extent of impact to wildlife and wildlife habitat, with 24 evaluation species. The vegetative structure of the impacted habitat was broken down into three components: big game winter range, riparian habitat and old-growth forest. The mitigation plan proposes implementation of the following, over a period of 20 years: (1) purchase of cut-over timber lands to mitigate, in the long-term, for big game winter range, and portions of the riparian habitat and old-growth forest (approx. 20,000 acres); (2) purchase approximately 4,400 acres of riparian habitat along the Willamette River Greenway; and (3) three options to mitigate for the outstanding old-growth forest losses. Monitoring would be required in the early stages of the 100-year plan. The timber lands would be actively managed for elk and timber revenue could provide O and M costs over the long-term.

  10. Hydroelectric power in Westphalia - inventory taking. Vol. 1. The Guetersloh district. Wasserkraft in Westfalen. Bestandsaufnahme. Bd. 1. Kreis Guetersloh

    Energy Technology Data Exchange (ETDEWEB)

    Hoebel, C.; Brepohl, W.

    1986-11-01

    The hydroelectric power plants located in the Guetersloh district were recorded and entered in standard forms to compile data informing about their sites, technical status, suitability for energy utilization, hydrological aspects, and entitlement to preservation. The records and inventories filed will be serving to compare the technical and structural historical value of different plants throughout North-Rhine Westphalia (e.g. corn mills, oil mills, fulling mills, iron mills, hydroelectric power plants), and help to select plants to be considered ancient monuments in the sense of the law. Retrofitting and restoration programs are about to be developed for some of the Guetersloh hydroelectric power plants identified as being worth preserving. (BR).

  11. Impact of hydroelectric development upon a northern Manitoba native community

    Energy Technology Data Exchange (ETDEWEB)

    Waldram, J.B.

    1983-01-01

    This dissertation describes the process of underdevelopment among the Cree Indian people of South Indian Lake, in Northern Manitoba, Canada, following the construction of the Churchill-Nelson River Hydro Project in 1975. The dissertation seeks to link the ecological, political, economic, socio-cultural and health aspects of the impact of the hydro project within the framework of the historical process of underdevelopment as it has occurred in Latin America, among Native people in the United States, and among Native people in Northern Canada. Utilizing both qualitative and quantitative data, a process of increased dependence is described as the product of two related processes. The first process is the impairment of the local commercial and domestic economy caused by the flooding of Southern Indian Lake, which has resulted in a decline in local productivity. The second process is the enhancement of consumerism through rising consumer expectations and a post-project increase in available goods and services which the people are increasingly unable to afford. The overall result has been a process of economic divergence at the local level. The dissertation concludes that the process of underdevelopment which has occurred in South Indian Lake has been the result primarily of changes in the local ecological system caused by the construction of the hydro project. These ecological changes have, in turn, resulted in secondary changes in the socio-economic system.

  12. Flood Frequency Analysis Under Non-stationarity Conditions: the Case of Southern Brazilian Hydroelectric Power Plants

    Science.gov (United States)

    Bartiko, Daniel; Chaffe, Pedro; Bonumá, Nadia

    2017-04-01

    Floods may be strongly affected by climate, land-use, land-cover and water infrastructure changes. However, it is common to model this process as stationary. This approach has been questioned, especially when it involves estimate of the frequency and magnitude of extreme events for designing and maintaining hydraulic structures, as those responsible for flood control and dams safety. Brazil is the third largest producer of hydroelectricity in the world and many of the country's dams are located in the Southern Region. So, it seems appropriate to investigate the presence of non-stationarity in the affluence in these plants. In our study, we used historical flood data from the Brazilian National Grid Operator (ONS) to explore trends in annual maxima in river flow of the 38 main rivers flowing to Southern Brazilian reservoirs (records range from 43 to 84 years). In the analysis, we assumed a two-parameter log-normal distribution a linear regression model was applied in order to allow for the mean to vary with time. We computed recurrence reduction factors to characterize changes in the return period of an initially estimated 100 year-flood by a log-normal stationary model. To evaluate whether or not a particular site exhibits positive trend, we only considered data series with linear regression slope coefficients that exhibit significance levels (pStudent's test. The trend model residuals were analyzed using the Anderson-Darling normality test, the Durbin-Watson test for the independence and the Breusch-Pagan test for heteroscedasticity. Our results showed that 22 of the 38 data series analyzed have a significant positive trend. The trends were mainly in three large basins: Iguazu, Uruguay and Paranapanema, which suffered changes in land use and flow regularization in the last years. The calculated return period for the series that presented positive trend varied from 50 to 77 years for a 100 year-flood estimated by stationary model when considering a planning horizon

  13. An Integrated Risk Approach for Assessing the Use of Ensemble Streamflow Forecasts in Hydroelectric Reservoir Operations

    Science.gov (United States)

    Lowry, T. S.; Wigmosta, M.; Barco, J.; Voisin, N.; Bier, A.; Coleman, A.; Skaggs, R.

    2012-12-01

    This paper presents an integrated risk approach using ensemble streamflow forecasts for optimizing hydro-electric power generation. Uncertainty in the streamflow forecasts are translated into integrated risk by calculating the deviation of an optimized release schedule that simultaneously maximizes power generation and environmental performance from release schedules that maximize the two objectives individually. The deviations from each target are multiplied by the probability of occurrence and then summed across all probabilities to get the integrated risk. The integrated risk is used to determine which operational scheme exposes the operator to the least amount of risk or conversely, what are the consequences of basing future operations on a particular prediction. Decisions can be made with regards to the tradeoff between power generation, environmental performance, and exposure to risk. The Hydropower Seasonal Concurrent Optimization for Power and Environment (HydroSCOPE) model developed at Sandia National Laboratories (SNL) is used to model the flow, temperature, and power generation and is coupled with the DAKOTA (Design Analysis Kit for Optimization and Terascale Applications) optimization package to identify the maximum potential power generation, the maximum environmental performance, and the optimal operational scheme that maximizes both for each instance of the ensemble forecasts. The ensemble forecasts were developed in a collaborative effort between the Pacific Northwest National Laboratory (PNNL) and the University of Washington to develop an Enhanced Hydrologic Forecasting System (EHFS) that incorporates advanced ensemble forecasting approaches and algorithms, spatiotemporal datasets, and automated data acquisition and processing. Both the HydroSCOPE model and the EHFS forecast tool are being developed as part of a larger, multi-laboratory water-use optimization project funded through the US Department of Energy. The simulations were based on the

  14. Sediment management of run-of-river hydroelectric power project in ...

    Indian Academy of Sciences (India)

    Author Affiliations. NEENA ISAAC1 2 T I ELDHO1. Department of Civil Engineering, Indian Institute of Technology Bombay, Mumbai 400076, India; Central Water and Power Research Station, Khadakwasla, Pune 411024, India ...

  15. 76 FR 81929 - South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project

    Science.gov (United States)

    2011-12-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission South Carolina Public Service Authority; Notice of Workshop for Santee... the National Marine Fisheries Service (NMFS) and the South Carolina Public Service Authority (SCPSA...

  16. 78 FR 45918 - Application for Presidential Permit; Soule River Hydroelectric Project

    Science.gov (United States)

    2013-07-30

    ... comparable open access and non-discrimination that apply to transmission in interstate commerce. DOE has... non-discrimination contained in the Federal Power Act and articulated in Federal Energy Regulatory... person seeking to become a party to this proceeding must file a ] motion to intervene at the address...

  17. 77 FR 38050 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-06-26

    ... of Reclamation's Pinto dam, on Billy Clapp Lake near the city of Moses Lake in Grant County... route between Billy Clapp Lake and Brook Lake; (4) a 7,000-foot-long, 34.5-kilovolt (kV) transmission...

  18. Review of Pacific Northwest Laboratory research on aquatic effects of hydroelectric generation and assessment of research needs

    Energy Technology Data Exchange (ETDEWEB)

    Fickeisen, D.H.; Becker, C.D.; Neitzel, D.A.

    1981-05-01

    This report is an overview of Pacific Northwest Laboratory's (PNL) research on how hydroelectric generation affects aquatic biota and environments. The major accomplishments of this research are described, and additional work needed to permit optimal use of available data is identified. The research goals are to: (1) identify impacts of hydroelectric generation, (2) provide guidance in allocating scarce water resources, and (3) develop techniques to avoid or reduce the impacts on aquatic communities or to compensate for unavoidable impacts. Through laboratory and field experiments, an understanding is being developed of the generic impacts of hydrogeneration. Because PNL is located near the Columbia River, which is extensively developed for hydroelectric generation, it is used as a natural laboratory for studying a large-scale operating system. Although the impacts studied result from a particular system of dams and operating procedures and occur within a specific ecosystem, the results of these studies have application at hydroelectric generating facilities throughout the United States.

  19. Legal obstacles and incentives to the development of small-scale hydroelectric power in Rhode Island

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Rhode Island, any private rights in the flowing waters of a river or stream depend upon ownership of the abutting land. It appears Rhode Island follows the reasonable use theory of riparian law. The Department of Environmental Management is the most significant administrative agency with regard to dam construction, alteration, and operation in the state of Rhode Island.

  20. Legal obstacles and incentives to the development of small scale hydroelectric potential in Illinois

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of the hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. The first obstacle which every developer in Illinois must confront is obtaining authority to utilize the river bed, banks, and flowing water at the proposed site. This involves determination of ownership of the stream banks and bed and the manner of obtaining either their title or use; and existing constraints with regard to the use of the water. Illinois follows the riparian theory of water law. Following the detailed discussion of the water law, direct and indirect regulations and financial considerations are discussed.

  1. Legal obstacles and incentives to the development of small scale hydroelectric potential in Wisconsin

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The initial obstacle that all developers confront in Wisconsin is obtaining the authority to utilize the bed, banks, and flowing water at a proposed dam site. This involves a determination of ownership of the stream banks and bed and the manner of obtaining either their title or use; and existing constraints with regard to the use of the water. Wisconsin follows the riparian theory of water law.

  2. Legal obstacles and incentives to the development of small scale hydroelectric power in Connecticut

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric power in Connecticut are discussed. The Federal government also exercises extensive regulatory authority in the area and this dual system is examined from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. Connecticut follows the riparian theory of water law. Under this theory of the water law, private rights in rivers and streams are confined to the use of flowing water. A riparian proprietor does not own the water that flows by his estate. Licensing, permitting, and review procedures are discussed followed by discussion on public utilities regulation and indirect considerations.

  3. Hydroelectricity and ecological considerations. Falsification of the environmental reality by the opponents of hydropower

    Directory of Open Access Journals (Sweden)

    Andrzej Giziński

    2013-09-01

    Full Text Available Opponents of hydroelectricity claim falsely that hydrotechnical development of the Lower Vistula River constitutes implementation of Edward Gierek’s concept of bringing only environmental damage1. Statements on the negative environmental impact of constructing small hydroelectric power stations (SHPS are equally groundless. Permanent protests against the construction of dams and river damming, regardless of the motivations and will of protesters, increase energy dependence on Russia, and preserves the poor, post-Bierut hydrological situation2. The main fallacy made by hydropower opponents is the alternative treatment of power and environmental purposes. Environmental errors consist in continuous omission of even the most obvious positive ecological effects of constructing river dams and – what is especially reprehensible – inventing non-existent threats, e.g. lethal concentration of toxic heavy metals in deposits of the Włocławek Reservoir or the detrimental impact of warming up water in stage of falls on the fish population below the dam.

  4. Legal obstacles and incentives to the development of small scale hydroelectric power in Ohio

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level is described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. A developer must obtain title or interest to a streambed from the proper riparian owners. Ohio provides assistance to an electric company in this undertaking by providing it with the power of eminent domain in the event it is unable to reach a purchase agreement with the riparian proprietors. The Ohio Water Law is discussed in detail, followed by discussions: Licensing, Permitting, and Review Procedures; Indirect Considerations; Ohio Public Utilities Commission; Ohio Department of Energy; Incidental Provision; and Financial Considerations.

  5. Efficiency on execution of environmental regulations for hydroelectric enterprising; Eficiencia na execucao das normas ambientais para empreendimentos hidroeletricos

    Energy Technology Data Exchange (ETDEWEB)

    Nadaud, Gabriela Caiuby Ariani; Young, Carlos Eduardo Frickmann [Universidade Federal do Rio de Janeiro (IE/GEMA/UFRJ), RJ (Brazil). Inst. de Economia. Grupo de Economia do Meio Ambiente e do Desenvolvimento Sustentavel], E-mail: young@ie.ufrj.br

    2010-07-01

    Viewing a more efficiency in the accomplishment of environmental regulations related to hydroelectric enterprises, this paper presents a proposal for indexes which can help the enterprise. From the verification that the accomplishment of legal requests to obtain the licensing does not minimizes the conflict risks and the consequent expenses, this index methodology presents himself as an tool which allows more efficient compensation measurements and the consequent reduction of the social-environmental costs of the hydroelectric enterprises.

  6. Establishing baseline biodiversity data prior to hydroelectric dam construction to monitoring impacts to bats in the Brazilian Amazon

    OpenAIRE

    Bobrowiec, Paulo Estefano D.; Tavares, Val?ria da Cunha

    2017-01-01

    The modification of Amazonian rivers by the construction of megaprojects of hydroelectric dams has widely increased over the last decade. Robust monitoring programs have been rarely conducted prior to the establishment of dams to measure to what extent the fauna, and its associated habitats may be affected by upcoming impacts. Using bats as models, we performed analyses throughout the area under the influence of the Santo Ant?nio hydroelectric dam, Southwestern Brazilian Amazonia before its c...

  7. Revolutionising landscapes: Hydroelectricity and the heavy industrialisation of society and environment in the Comte de Beauharnois, 1927--1948

    Science.gov (United States)

    Pelletier, Louis-Raphael

    This dissertation analyses the rapid industrialisation of the rural Comte de Beauharnois and the adjacent stretch of the Fleuve Saint-Laurent owing to the construction, between 1929 and 1948, of a gigantic canal for hydroelectricity production and navigation by an electricity corporation called the Beauharnois Light Heat and Power (BLH&P). Using principally the archives of the BLH&P---especially its complaints files and its rich photographic record---this thesis argues that this process exemplifies the finance capitalist reorganisation of the society and ecosystems of the Canadian province of Quebec from the 19th century to the Great Depression. In keeping with recent work in environmental history, the transformation of rural landscapes and a river for heavy industry is described as an important dimension of a revolution in modes of production. More specifically, I argue that, in the case under study, the finance-capitalist reorganisation of Quebec revolved around two central and explicit projects, one social and the other environmental: the grouping of most individuals in an industrial working class without control over the means of production and the reorganisation of rural landscapes into reservoirs of modern energy and industrial natural resources.

  8. National Hydroelectric Power Resources Study. Preliminary Inventory of Hydropower Resources. Volume 3. Mid-Continent Region.

    Science.gov (United States)

    1979-07-01

    utilizing water pumped into a storage reservoir, usually during off—peak hours. SMALL—SCALE HYDROELECTR IC POWER PLANT: A hydroelect r ic generating station ...inventory . In particular , the supplemental data included the designation of a U.S. Geological Survey (U.s.G.S.) reference gaging station ; a refined...maximum load which a generator, generating station , or other electrical apparatus can supply under specified conditions for a given period of time

  9. Herpetofauna, Espora Hydroelectric Power Plant, state of Goiás, Brazil.

    Directory of Open Access Journals (Sweden)

    Vaz-Silva, W.

    2007-01-01

    Full Text Available We provide a checklist of the herpetofaunal assemblage from Espora Hydroelectric Power Plant region(UHE Espora, southwestern of the state of Goiás, Brazil. Representatives of 32 amphibian and 71 reptile species wereobtained during faunal monitoring and faunal rescue programs carried out in the study area. The obtained species listand distribution records are here discussed in an attempt to improve the still limited knowledge on Cerradoherpetofaunal assemblages.

  10. Legal obstacles and incentives to the development of small scale hydroelectric power in New York

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The first step the small scale hydroelectric developer must take is that of acquiring title to the real property comprising the development site. The real estate parcel must include the requisite interest in the land adjacent to the watercourse, access to the underlying streambed and where needed, the land necessary for an upstream impoundment area. Land acquisition may be effectuated by purchase, lease, or grant by the state. In addition to these methods, New York permits the use of the eminent domain power of the state for public utilities under certain circumstances.

  11. Analysis of the Level-Release Polynomial from a Hydroelectric Plant

    Directory of Open Access Journals (Sweden)

    Ieda Hidalgo

    2012-02-01

    Full Text Available The mathematic representation of the tailrace elevation as function of the water release can be modified, for example, by the geomorphologic impact of large floods. The level-release polynomial from a hydroelectric plant is important information to computational models used for optimization and simulation of the power generation systems operation. They depend on data quality to provide reliable results. Therefore, this paper presents a method for adjusting of the tailrace polynomial based on operation data recorded by the plant’s owner or company. The proposed method uses a non-linear regression tool, such as Trendline in Excel. A case study has been applied to the data from a large Brazilian hydroelectric plant whose operation is under the coordination of the Electric System ational Operator. The benefits of the data correction are analyzed using a simulation model for the hydroelectric plants operation. This simulator is used to reproduce the past operation of the plant, first with official data and second with adjusted data. The results show significant improvements in terms of quality of the data, contributing to bring the real and simulated operation closer.

  12. Water development projects map

    Science.gov (United States)

    A new map showing major water development projects across the United States has been published by the U.S. Geological Survey (USGS). The map shows the location, size, and ownership of approximately 2800 of the nation's major multipurpose and flood control dams and virtually all of the reservoir storage and flood control capacity of the country. Other features illustrated on the map include U.S. Bureau of Reclamation surface water irrigation projects; watershed protection projects of the U.S. Soil Conservation Service; hydroelectric power facilities, including both federal plants and nonfederal plants leased by the Federal Energy Regulatory Commission; U.S. Army Corps of Engineers navigation and flood damage reduction projects; and the federal systems of wild and scenic rivers. The map also delineates major rivers and the 21 USGS water resources region boundaries so that users of the map can locate development projects with respect to drainage basins.

  13. Analysis of environmental studies of the mammals in small hydroelectrics power in the Espirito Santo; Analise dos estudos ambientais da mastofauna em pequenas centrais hidreletricas do Espirito Santo

    Energy Technology Data Exchange (ETDEWEB)

    Bonesi, Patricia Conde

    2011-10-15

    The hydroelectric projects have been the main form to supply the energy demand in Brazil. Although it has been considered a way of clean generation, it brings many environmental impacts. Due to the fact that inconsistencies in environmental impact studies often occur, this study aimed to evaluate the quality of environmental diagnosis of the mammals in SHP in the Espirito Santo. Therefore, was notice an insufficient data survey, because of the relevance given to the secondary data and the lack of seasonal investigations, bringing damages to the proposals submitted of environmental compensation. This way, manners ware proposed that aim to improve the quality of these studies, which include since environmental awareness programs at the penalizing of those involved in such studies. (author)

  14. Summary of the New England conference on legal and institutional incentives to small-scale hydroelectric development (Boston Massachusetts, January 30-31, 1979)

    Energy Technology Data Exchange (ETDEWEB)

    1980-05-01

    The New England Conference on Legal and Institutional Incentives to Small Scale Hydroelectric Development examined the legal and institutional problems confronting small-scale hydroelectric potential of the northeast. Representatives from DOE, FERC, state legislatures, state public service commissions, private developers, and environmental groups attempted to evaluate the state of hydroelectric development in New England. The meeting began with an introductory panel followed by workshops addressing four topics: Federal regulatory systems, state regulatory systems, the economics of small-scale hydroelectric development, and systems dynamics and the systems dynamics model. Comments by the Honorable Georgiana H. Sheldon, FERC, are presented.

  15. Malaria and water resource development: the case of Gilgel-Gibe hydroelectric dam in Ethiopia

    Directory of Open Access Journals (Sweden)

    Kloos Helmut

    2009-01-01

    Full Text Available Abstract Background Ethiopia plans to increase its electricity power supply by five-fold over the next five years to fulfill the needs of its people and support the economic growth based on large hydropower dams. Building large dams for hydropower generation may increase the transmission of malaria since they transform ecosystems and create new vector breeding habitats. The aim of this study was to assess the effects of Gilgel-Gibe hydroelectric dam in Ethiopia on malaria transmission and changing levels of prevalence in children. Methods A cross-sectional, community-based study was carried out between October and December 2005 in Jimma Zone, south-western Ethiopia, among children under 10 years of age living in three 'at-risk' villages (within 3 km from dam and three 'control' villages (5 to 8 km from dam. The man-made Gilgel-Gibe dam is operating since 2004. Households with children less than 10 years of age were selected and children from the selected households were sampled from all the six villages. This included 1,081 children from 'at-risk' villages and 774 children from 'control' villages. Blood samples collected from children using finger prick were examined microscopically to determine malaria prevalence, density of parasitaemia and identify malarial parasite species. Results Overall 1,855 children (905 girls and 950 boys were surveyed. A total of 194 (10.5% children were positive for malaria, of which, 117 (60.3% for Plasmodium vivax, 76 (39.2% for Plasmodium falciparum and one (0.5% for both P. vivax and P. falciparum. A multivariate design-based analysis indicated that, while controlling for age, sex and time of data collection, children who resided in 'at-risk' villages close to the dam were more likely to have P. vivax infection than children who resided farther away (odds ratio (OR = 1.63, 95% CI = 1.15, 2.32 and showed a higher OR to have P. falciparum infection than children who resided in 'control' villages, but this was not

  16. What is the real price of hydroelectric production on the Senegal River?

    Science.gov (United States)

    Raso, Luciano; Bader, Jean-Claude; Malaterre, Pierre-Olivier

    2014-05-01

    Manantali is an annual reservoir on the Senegal River, located in Mali and serving Senegal and Mauritania. The reservoir is used to regulate the flow for hydroelectric production, in the face of the extremely variable seasonal climate of the region. Manantali has been operative for about 10 years now, exceeding the planned production capacity. The economic benefit comes at a price. Before the dam's construction, the annual flood was the basis of flood recession agriculture, traditionally practiced by the local population. Hydroelectric production requires a more regular flow; therefore flow peaks that used to create the flood are now dumped in the reservoir. Floods are reduced because the current reservoir management privileges hydroelectric production to flood recession agriculture. Moreover, the local water authority is evaluating the construction of 6 more reservoirs, which will enhance even further the controllability of the river flow. This study assesses the externalities of energy production for the agricultural production, quantifying the reduction of flooded surface when energy production is maximized, or alternatively, the loss energy production to maintain a minimum sustainable flood. In addition, we examine the system reliability against extreme events, and how a better use of hydrological information can improve the present reservoir management, in order to find a win-win solution. In this study we employ Stochastic Dual Dynamic Programming (SDDP) methodology. SDDP is a leaner version of Stochastic Dynamic Programming (SDP). SDDP does not suffer of the "curse of dimensionality", and therefore it can be applied to larger systems. In this application we include in the model: i) A semi-distributed hydrological model, ii) the reservoir, iii) the hydraulic routing process within the catchment and from the reservoir to the floodplain.

  17. Rapid green synthesis of ZnO nanoparticles using a hydroelectric cell without an electrolyte

    Science.gov (United States)

    Shah, Jyoti; Kumar Kotnala, Ravinder

    2017-09-01

    In this study, zinc oxide (ZnO) nanoparticles were synthesized using a novel environmentally friendly hydroelectric cell without an electrolyte or external current source. The hydroelectric cell comprised a nanoporous Li substituted magnesium ferrite pellet in contact with two electrodes, with zinc as the anode and silver as an inert cathode. The surface unsaturated cations and oxygen vacancies in the nanoporous ferrite dissociated water molecules into hydronium and hydroxide ions when the hydroelectric cell was dipped into deionized water. Hydroxide ions migrated toward the zinc electrode to form zinc hydroxide and the hydronium ions were evolved as H2 gas at the silver electrode. The zinc hydroxide collected as anode mud was converted into ZnO nanoparticles by heating at 250 °C. Structural analysis using Raman spectroscopy indicated the good crystallinity of the ZnO nanoparticles according to the presence of a high intensity E2-(high) mode. The nanoparticle size distribution was 5-20 nm according to high resolution transmission electron microscopy. An indirect band gap of 2.75 eV was determined based on the Tauc plot, which indicated the existence of an interstitial cation level in ZnO. Near band edge and blue emissions were detected in photoluminescence spectral studies. The blue emissions obtained from the ZnO nanoparticles could potentially have applications in blue lasers and LEDs. The ZnO nanoparticles synthesized using this method had a high dielectric constant value of 5 at a frequency of 1 MHz, which could be useful for fabricating nano-oscillators. This facile, clean, and cost-effective method obtained a significant yield of 0.017 g for ZnO nanoparticles without applying an external current source.

  18. 76 FR 12096 - McCloud-Pit Project; Notice of Availability of the Final Environmental Impact Statement for the...

    Science.gov (United States)

    2011-03-04

    ... Energy Regulatory Commission McCloud-Pit Project; Notice of Availability of the Final Environmental Impact Statement for the Mccloud-Pit Hydrolectric Project In accordance with the National Environmental... reviewed the application for license for the McCloud-Pit Hydroelectric Project (FERC No. 2106), located on...

  19. Legal obstacles and incentives to the development of small scale hydroelectric potential in Michigan

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level is described. The Federal government also exercises extensive regulatory authority in the area. The first obstacle which any developer must confront in Michigan is obtaining the authority to utilize the river bed, banks, and flowing water at a proposed dam site. This involves a determination of ownership of the stream banks and bed, and the manner of obtaining either their title or use; and existing constraints with regard to the use of the water. Michigan follows the riparian theory of water law. The direct regulation; indirect regulation; public utilities regulation; financing; and taxation are discussed.

  20. Developer's guide to small-scale hydroelectric development in the southeast

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    This report is intended primarily to provide to small-scale hydroelectric developers precise information on the federal and state permitting processes in the eight states of Region IV of the US Department of Energy, i.e., Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina, and Tennessee. The procedures for each permit are described in the text and flow charts are provided at the end of each chapter. Information is also included on state financing and taxation incentives which may apply to small hydro and on the Public Utility Policies Act as it applies to small hydro.

  1. Implantation of hydroelectric power plants and the environmental licensing: the importance of the articulation among the electrical and environment sectors in Brazil; A implantacao de usinas hidreletricas e o processo de licenciamento ambiental: a importancia da articulacao entre os setores eletrico e de meio ambiente no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Facuri, Micheline Ferreira

    2004-07-01

    Hydroelectric power plants stand for the main generation source in Brazil. The basis of the national generator park installed capacity is the exploration of hydraulic potency when the Brazilian energetic die is observed. The atmosphere that the Brazilian electric sector is found now asks for new generator units. In this sense, it would decrease energy offer deficit risk, which collaborates to the electric energy offer expansion effort. This research aims to join and to comment on a group of data and information regarding to the process of implantation of hydroelectric power plants already bid. It includes up to date data on hydroelectric power plants bid since 1996. This data describe the main implications found in the enterprises that are late in their schedules. It shows that the greater the environmental management instruments incorporation in hydroelectric projects planning process, the greater the possibility of new hydraulic generation enterprises with better quality of environmental studies implantation. In this way, it makes even better the process of environmental licensing that could occur in a more adequate deadline. As a result, 28 - out of 54 - enterprises bid are found with environmental problems, which represent 43.30% of bestowed potency. It is possible to infer, thus, that there is a need of more interaction between the electric and the environmental sectors. After analyzing the results, it is concluded that the generation enterprises environmental licensing has been worrying the electric sector agents. This happens due to the need of refinement on environmental studies or due to the need of bureaucracy to get licenses - mainly regarding to judicial actions and environmental issues. Finally, the adequate identification of environmental licensing drags allows a more efficient process to hydroelectric power plants implantation, which generates more consistent and faster results. (author)

  2. Physicochemical Characteristics of River Water Downstream of a Large Tropical Hydroelectric Dam

    Directory of Open Access Journals (Sweden)

    Teck-Yee Ling

    2016-01-01

    Full Text Available Water quality in the downstream river of a hydroelectric dam may be affected by the structural design and operation. To date, little is known about the water quality downstream of the largest dam in Malaysia, the Bakun hydroelectric dam. Therefore, the objective of the study was to determine the water quality downstream of the dam when the spillway was closed and when it was opened. Results of the study indicate that the dam plays a significant role in regulating the water quality downstream of it. When the spillway was closed, pH and oxygen were lower in the river where DO was below 5 mg/L. When the spillway was opened, the water quality improved in terms of oxygen content (>8.0 mg/L, total sulphide (TS, and chemical oxygen demand (COD but deteriorated in terms of five-day biochemical oxygen demand (BOD5, total ammonia nitrogen (TAN, and total phosphorus (TP. Additionally, the intensity of the impacts, particularly BOD5, COD, and TAN, shows a declining trend as distance from the dam increases. This study shows that impacts on the water quality extend to a distance of 32 km from the dam particularly turbidity and DO and opening the spillway changes the water quality significantly.

  3. Hydrologic Simulations Driven by Satellite Rainfall to Study the Hydroelectric Development Impacts on River Flow

    Directory of Open Access Journals (Sweden)

    Tuan B. Le

    2014-11-01

    Full Text Available This study assesses the impact of hydroelectric dams on the discharge and total suspended solids (TSS concentration in the Huong River basin in Vietnam. The analysis is based on hydrologic and sediment transport simulations by the Soil and Water Assessment Tool (SWAT model driven by the Tropical Rainfall Measuring Mission (TRMM 3B42V6 rainfall data, from January 2003 through December 2010. An upstream sub-basin not affected by the hydroelectric dams was used for model calibration. The calibration results indicate good agreement between simulated and observed daily data (0.67 Nash-Sutcliffe efficiency, 0.82 Pearson correlation coefficient. The calibrated model for discharge and TSS simulation is then applied on another major sub-basin and then the whole Huong River basin. The simulation results indicate that dam operation in 2010 decreased downstream discharge during the rainy season by about 35% and augmented it during the dry season by about 226%. The downstream TSS concentration has decreased due to the dam operation but the total sediment loading increased during the dry season and decreased during the rainy season. On average, the dam construction and operation affected the pattern of discharge more than that of the sediment loading. Results indicate that SWAT, driven by remotely sensed inputs, can reasonably simulate discharge and water quality in ungauged or poorly gauged river basins and can be very useful for water resources assessment and climate change impact studies in such basins.

  4. A model for the data extrapolation of greenhouse gas emissions in the Brazilian hydroelectric system

    Science.gov (United States)

    Pinguelli Rosa, Luiz; Aurélio dos Santos, Marco; Gesteira, Claudio; Elias Xavier, Adilson

    2016-06-01

    Hydropower reservoirs are artificial water systems and comprise a small proportion of the Earth’s continental territory. However, they play an important role in the aquatic biogeochemistry and may affect the environment negatively. Since the 90s, as a result of research on organic matter decay in manmade flooded areas, some reports have associated greenhouse gas emissions with dam construction. Pioneering work carried out in the early period challenged the view that hydroelectric plants generate completely clean energy. Those estimates suggested that GHG emissions into the atmosphere from some hydroelectric dams may be significant when measured per unit of energy generated and should be compared to GHG emissions from fossil fuels used for power generation. The contribution to global warming of greenhouse gases emitted by hydropower reservoirs is currently the subject of various international discussions and debates. One of the most controversial issues is the extrapolation of data from different sites. In this study, the extrapolation from a site sample where measurements were made to the complete set of 251 reservoirs in Brazil, comprising a total flooded area of 32 485 square kilometers, was derived from the theory of self-organized criticality. We employed a power law for its statistical representation. The present article reviews the data generated at that time in order to demonstrate how, with the help of mathematical tools, we can extrapolate values from one reservoir to another without compromising the reliability of the results.

  5. Influence of the Amazon Hydrological Regime on Eutrophication Indicators of a Hydroelectric Power Plant Reservoir.

    Science.gov (United States)

    Freire, Jean Carlos A; Hauser-Davis, Rachel Ann; da Costa Lobato, Tarcísio; de Morais, Jefferson M; de Oliveira, Terezinha F; F Saraiva, Augusto Cesar

    2017-05-01

    Dam constructions in the Amazon have increased exponentially in the last decades, causing several environmental impacts and serious anthropogenic impacts in certain hydroelectric power plant reservoirs in the region have been identified. The assessment of the trophic status of these reservoirs is of interest to indicate man-made changes in the environment, but must take into account the hydrological cycle of the area. This can be relevant for environmental management actions, aiding in the identification of the ecological status of water bodies. In this context, physico-chemical parameters and eutrophication indicators were determined in a hydroelectric power plant reservoir in the Brazilian Amazon to assess trophic variations during the regional hydrological regime phases on the reservoir, namely dry, filling, full and emptying stages. The local hydrological regimes were shown to significantly influence TSS and turbidity, as well as NH 4 , NO 3 , PO 4 , with higher values consistently observed during the filling stage of the reservoir. In addition, differences among the sampling stations regarding land use, population and anthropogenic activities were reflected in the PO 4 3- values during the different hydrological phases.

  6. Legal obstacles and incentives to the development of small scale hydroelectric power in Delaware

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Delaware, a watercourse is not to be confused with surface water. Each gives rise to certain riparian rights, but the law makes certain distinctions between the two. The presence of both surface waters and watercourses give rise to private and public rights related to the presence of the water. Some of these rights are vested in riparian owners. Recent Delaware case law has described the riparian owner as one who owns land on the bank of a river, or who is owner of land along, bordering upon, bounded by, fronting upon, abutting, or adjacent and contiguous to and in contact with a river. But, ownership of the bank does not give the riparian ownership of the water. Some law cases are cited to discuss the laws in Delaware.

  7. Legal obstacles and incentives to the development of small scale hydroelectric power in Maryland

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maryland are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined with the aim of creating a more orderly understanding of the vagaries of the system, focusing on the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. In Maryland, by common law rule, title to all navigable waters and to the soil below the high-water mark of those waters is vested in the state as successor to the Lord Proprietary who had received it by grant from the Crown. Rights to non-navigable water, public trust doctrine, and eminent domain are also discussed. Direct and indirect regulations, continuing obligations, loan programs, and regional organizations are described in additional sections.

  8. Static ice loads on hydro-electric structures: ice load monographs: Volume 1: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Comfort, G.; Abdelnour, R.; Gong, Y.; Dinovitzer, A.

    1996-07-01

    Ice loads on hydro-electric structures were measured during a four-year field program. Loads were measured at Hydro-Quebec`s Paugan dam, Ontario Hydro`s Arnprior and Otto Holden dams, and in a large outdoor basin at the National Research Council (NRC) during one winter. Ice loads were measured in the reservoir ice sheet, near the concrete face of the dam, and near the gate and pier of the Paugan dam. Ice stresses were measured continuously by stressmeters that were deployed in the ice. Loads at the Paugan dam and the NRC basin resulted mostly from ice temperature changes. The loads at the Arnprior and Otto Holden dams were produced by a combination of ice temperature and water level changes. The collected data was analyzed in detail and efforts were made to improve techniques for predicting ice loads. Significant progress was made towards the development of detailed, quantitative understanding of static ice loads on hydro-electric structures, and the factors controlling them. However, the ice load predictors are subject to a number of limitations and further work is required before changes to design practices can be recommended with confidence. More field data collection would also improve the definition of loads arising from a combination of water level and ice temperature changes. Additional numerical analyses was also recommended to better define the effects of ice confinement. Appendices were published separately in volume 2 of this report. 43 refs., 18 tabs., 96 figs.

  9. Open system architecture for condition based maintenance applied to a hydroelectric power plant

    Energy Technology Data Exchange (ETDEWEB)

    Amaya, E.J.; Alvares, A.J. [University of Brasilia (UnB), DF (Brazil). Mechanical and Mechatronic Dept.], Emails: eamaya@unb.br, alvares@AlvaresTech.com; Gudwin, R.R. [State University of Campinas (UNICAMP), SP (Brazil). Computer Engineering and Industrial Automation Dept.], E-mail: gudwin@dca.fee.unicamp.br

    2009-07-01

    The hydroelectric power plant of Balbina is implementing a condition based maintenance system applying an open, modular and scalable integrated architecture to provide comprehensive solutions and support to the end users like operational and maintenance team. The system called SIMPREBAL (Predictive Maintenance System of Balbina) is advocate of open standards, in particular through collaborative research programmers. In the developing is clearly understands the need for both, industry standards and a simple to use software development tool chain, supporting the development of complex condition based maintenance systems with multiple partners. The Open System Architecture for Condition Based Maintenance (OSA-CBM) is a standard that consider seven hierarchic layers that represent a logic transition or performed data flow from the data acquisition layer, through the intermediates layers as signal processing, condition monitor, health assessment, prognostics and decision support, to arrive to the presentation layer. SIMPREBAL is being implementing as an OSA-CBM software framework and tool set that allows the creation of truly integrated, comprehensive maintenance solutions through the internet. This paper identifies specific benefits of the application of the OSA-CBM in comprehensive solutions of condition based maintenance for a hydroelectric power plant. (author)

  10. Enhanced greenhouse gas emission from exposed sediments along a hydroelectric reservoir during an extreme drought event

    Science.gov (United States)

    Jin, Hyojin; Yoon, Tae Kyung; Lee, Seung-Hoon; Kang, Hojeong; Im, Jungho; Park, Ji-Hyung

    2016-12-01

    An active debate has been underway on the magnitude and duration of carbon (C) emissions from hydroelectric reservoirs, yet little attention has been paid to stochastic C emissions from reservoir sediments during extreme climatic events. A rare opportunity for field measurements of CO2 efflux from a hydroelectric reservoir in Korea during an extreme drought event was used to examine how prolonged droughts can affect microbial organic matter processing and the release of CO2, CH4 and N2O from exposed sediments. Chamber measurements of CO2 efflux along an exposed sediment transect, combined with high-frequency continuous sensor measurements of the partial pressure of CO2 (pCO2) in the reservoir surface water, exhibited extraordinary pulses of CO2 from exposed sediments and the turbulent inflowing water in contrast to a small CO2 sink in the main water body of the reservoir and a low efflux of CO2 from the flooded sediment. Significant increases in the production of CO2, CH4 and N2O observed in a laboratory incubation of sediments, together with enhanced activities of phenol oxidase and three hydrolases, indicate a temporary activation of microbial organic matter processing in the drying sediment. The results suggest that drought-triggered pulses of greenhouse gas emission from exposed sediments can offset the C accumulation in reservoir sediments over time scales of years to decades, reversing the trend of declining C emissions from aging reservoirs.

  11. Legal obstacles and incentives to the development of small scale hydroelectric power in New Hampshire

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are described. The Federal government also exercises extensive regulatory authority in the area and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The first step any developer must take is that of acquiring the real estate parcel. The step involves acquisition in some manner of both river banks, the river bed, and where necessary the land needed for the upstream impoundment area. The developer must acquire the river banks to be considered a riparian owner. Classification as a riparian is important for only a use of water by a riparian owner is deemed a reasonable use and hence legal. Apart from acquisition by sale, lease, or gift, New Hampshire law permits a number of other methods. In part use of these methods will depend on whether the developer is the state, a municipality, a private corporation, or a public utility. Provided the developer avails himself of the five (5) megawatts exemption, his main regulatory agency will be the Water Resources Board. However, the state is not free from the problems of legal uncertainty inherent in determinations of reasonableness.

  12. Legal obstacles and incentives to the development of small-scale hydroelectric power in Virginia

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy in Virginia are described. The state regulatory system does not comprise final authority; the Federal government also exercises extensive regulatory authority in the area. This dual system is a function of the federalist nature of our government. The introductory section examines the dual system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and inquires into the practical use of the doctrine by the FERC. The use of a natural-surface watercourse in Virginia is governed generally by the doctrine of riparian rights. Riparian rights is a system of water rights based on ownership of land bordering on a natural stream or watercourse. For land to be considered riparian to a stream, that land must be located on the watershed of that portion of the stream. The theory of riparian rights followed in Virginia is one of reasonable use. Under the reasonable-use doctrine, each riparian owner has an equal right to the reasonable use of the water running naturally through or by his land for any useful purpose. The water must continue to run after such use without material diminution or alteration and without pollution.

  13. Report on the renewal of the hydro-electric concessions; Rapport sur le renouvellement des concessions hydroelectriques

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-11-15

    The administrative procedures of the renewable of the hydro-electric concessions in France is a real problem, leading to too long time of the case files examination. This mission aimed to identify the technical and financial criteria on which the decision maker will base his choice to give the concessions renewal. This report exposes the evaluation and the recommendations of the mission. The first part establishes an evaluation of the situation of the hydro-electric concessions and the today renewal procedures. The second part presents a analysis of this situation and the recommendations. The last part brings the conclusions. (A.L.B.)

  14. Environmental health impact assessment in hydroelectric plants; Principais impactos sobre a saude da populacao afetada por projetos hidreletricos

    Energy Technology Data Exchange (ETDEWEB)

    Bulcao, Jose A.S. [FURNAS Centrais Eletricas S.A., Rio de Janeiro, RJ (Brazil). Dept. de Saude; Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia. Programa de Planejamento Energetico]. E-mail: bulcao@furnas.com.br

    2002-07-01

    Environmental health impact assessment in hydroelectric plants is very important in Brazil. The hydropower predominance and the potential of inventoried plants which will be new large dams is, in reality, a fact in country development with a special reference to the Amazon Basin. This paper describes the very important health impacts and their relation to the sociological environment changes in planning, construction and operation of hydroelectric plants. It includes the assessment of malaria dynamic as an example of the importance of public health preventive strategies. It also describes malaria impacts and others health problems as they happened in large dams in Amazonia area. (author)

  15. Estimating design effort for GE hydro projects

    Energy Technology Data Exchange (ETDEWEB)

    Bashir, H.A. [Sultan Qaboos University, Muscat (Oman). Dept. of Mechanical and Industrial Engineering; Thomson, V. [McGill University, Montreal (Canada). Dept. of Mechanical Engineering

    2004-04-01

    Effort estimation is an essential process in determining the final cost, as well as the duration of, a future design project. This paper discusses the construction of a parametric model done in collaboration with General Electric (GE) Hydro (GE Hydro is a world leader in the design and construction of generators and turbines for hydro-electric power generation), the purpose being to estimate the effort needed to create designs for hydro-electric generators. An analysis of the data showed that the developed model resulted in a mean relative error of 13% compared to original estimation errors by GE Hydro staff, which averaged 27%. GE has been using the estimation model for its projects since the beginning of the year 2000. (author)

  16. What tools do we have to study the morphological effects of hydroelectric plants in developing countries? The Chilean case

    Science.gov (United States)

    Alcayaga, Hernan; Caamaño, Diego; Palma, Sebastian; Contreras, Karla

    2017-04-01

    Countries growing rates are directly related to energy production. Therefore, developed and developing nations are focused on hydropower and dam construction; on the contrary dam removal practices are significantly different among nations, demonstrating the former group a lesser interest on removing structures. Chiles hydropower generation corresponds to 50% of the current grid, having a potential capacity to double the current situation. Thus: ¿What tools can we apply to assess the potential impacts on our rivers? The goal of this project is to study two different reaches located in two separates streams in Central Chile. The Aconcagua River represents a mountain stream (i.e. steep, narrow, and confined) subject to the operation of a hydroelectric system composed by five diversion hydropower plants built during the 90`s. The Rapel River reach corresponds to the last 10km upstream to the outlet; it is a mild and wide stream that includes the gravel-sand transition. The Rapel dam operates about 25km upstream this second reach that is characterized by an 112m wall built in 1968. The Aconcagua hydropower system was characterized within a GIS environment and a morphological response conceptual model applied. The model uses two indexes to evaluate changes in i) channel forming discharge and ii) sediment supply. The provided response shows the trends and magnitudes of the changes, based in eighth possible directions for ten morphological responsible variables. The Rapel river system was evaluated differently and sampling of sediments characteristics (D50 and armour index), discharge index for both before and after the dam operation, Morphological Quality Index (IQM) and an analysis of aerial photography time series were performed. Results showed that the hydrology indicator impacts for the Aconcagua system were more severe than the impacts on sediments transport (typically the case for diversion type hydropower). A fine armour layer was found within the Rapel river site

  17. Rural electrification in Santarem: contribution of micro hydroelectric power plants; Eletrificacao rural em Santarem: contribuicao das micro centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Els, Rudi Henri Van; Diniz, Janaina Deane De Abreu Sa; Souza, Josiane do Socorro Aguiar de; Brasil Junior, Antonio Cesar Pinho; Sousa, Antonio Nazareno Almada de [Universidade de Barsilia (UnB), DF (Brazil). Lab. de Energia e Ambiente; Kroetz, Jaemir Grasiel [Indalma Industria e Comercio, Santarem, PA (Brazil)

    2010-07-01

    The municipality of Santarem in the lower Amazon river is the main center in the western region of the state of Para with a population of 274.285 inhabitants, with 31.633 of them living in the rural zone, where only 1.060 rural costumers have access to regular electricity service from the utility provider. This incipient coverage of electricity service in the rural zone urged the local population to look for alternatives. This was found in the use of the hydraulic potential of creeks and rivers with rapids and waterfalls to implement pico and micro hydroelectric plants. So since 2001, 44 pico and 12 micro hydropower plants were installed in the municipalities of Santarem, Belterra and Uruara in the state of Para by local entrepreneurs and communities to attend their basic electricity needs. These systems attend approximately 580 families with a total installed capacity of more than 700 kVA. The consolidation of this technological alternative induced the Regional Superintendent of the Institute for Colonization and Land Reform (INCRA) and the Municipality of Santarem to elaborate a project to attend the land reform settlements in the region. This led to the installation of 6 micro hydropower (MHP) with a total installed capacity of 820kVA and a 252 km distribution network to attend 1.630 families in the settlements of Moju and Corta Corda. The purpose of this paper is to present the MHP's installed in the region and to show the contribution of these units in the rural electrification of rural settlements in Santarem. The paper discusses also the management model of these units. The survey's methodology consisted in the systematization of project data from the plant builder, INCRA and the municipality. The information was obtained from the official bibliography from the local actors and complemented by field surveys with interviews and observation. Despite the fact that the MHP's are in operation, they are not yet registered in the data base of the

  18. Do Hydroelectric Dams Mitigate Global Warming? The Case of Brazil's Curuna Dam

    Energy Technology Data Exchange (ETDEWEB)

    Fearnside, P.M. [National Institute for Research in the Amazon (INPA), C.P. 478, 69011-970 Manaus, Amazonas (Brazil)

    2005-10-15

    Hydroelectric dams in tropical forest areas emit greenhouse gases, as illustrated by the Curuna dam in the Amazonian portion of Brazil. Emissions include carbon dioxide from decay of the above-water portions of trees that are left standing in the reservoir and methane from soft vegetation that decays under anaerobic conditions on the bottom of the reservoir, especially macrophytes (water weeds) and vegetation that grows in the drawdown zone and is flooded when the reservoir water level rises. Some methane is released from the reservoir surface through bubbling and diffusion, but larger amounts are released from water passing through the turbines and spillway. Methane concentration in the water increases with depth, and the turbines and spillway draw water from sufficient depth to have substantial methane content. In 1990 (13 years after filling), the Curuna Dam emitted 3.6 times more greenhouse gases than would have been emitted by generating the same amount of electricity from oil.

  19. Feasibility determination for hydroelectric development at Thermalito Afterbay with STRAFLO turbine-generators. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, B.L.

    1979-06-01

    This study addresses the development of the Thermalito Afterbay, in California. Presently, the outlet of the afterbay dissipates the afterbay's useful energy through five radial gates into the Feather River complex. The feasibility of constructing a hydroelectric facility to recover this wasted energy through the use of STRAFLO hydro turbines is appraised, and data relevant to the future economic benefits of such a facility as compared to alternate energy alternatives are presented. In addition, the regulatory, ecological, and socio-institutional impacts which form additional considerations to a future thermalito afterbay site development are summarized. The study shows an annual generation potential of 48.82 GWh. The cost of developing the site is estimated to be $23.5 million. Social and environmental effects would be minimal. The final feasibility of development is contingent on power contracts which the state of California will be negotiating in 1983. (LCL)

  20. Monitoring headloss caused by debris on hydro-electric power intake trashracks

    Energy Technology Data Exchange (ETDEWEB)

    Abdelnour, R.; Gong, Y.; Comfort, G. [Fleet Technology Ltd., Kanata, ON (Canada)

    1996-06-01

    The importance of power generation losses at hydro-electric power dams from debris (mostly logs) and ice accumulation was discussed. A system which could monitor headlosses due to debris accumulation at water intake trashracks, was described. Two systems were used at the Chelsea power plant in Quebec. The systems consisted of measuring the water levels of the reservoir and the tailrace. The amount of power generated and the turbine rating curves were used to determine the headlosses. The headlosses due to trash were calculated in real time. Results demonstrated the reliability of the system and showed that it could be implemented at most low head dams in Canada at a reasonable cost. 4 refs., 7 tabs., 6 figs.

  1. Grid-connected in-stream hydroelectric generation based on the doubly fed induction machine

    Science.gov (United States)

    Lenberg, Timothy J.

    Within the United States, there is a growing demand for new environmentally friendly power generation. This has led to a surge in wind turbine development. Unfortunately, wind is not a stable prime mover, but water is. Why not apply the advances made for wind to in-stream hydroelectric generation? One important advancement is the creation of the Doubly Fed Induction Machine (DFIM). This thesis covers the application of a gearless DFIM topology for hydrokinetic generation. After providing background, this thesis presents many of the options available for the mechanical portion of the design. A mechanical turbine is then specified. Next, a method is presented for designing a DFIM including the actual design for this application. In Chapter 4, a simulation model of the system is presented, complete with a control system that maximizes power generation based on water speed. This section then goes on to present simulation results demonstrating proper operation.

  2. Ticks (Acari: Ixodidae on wild animals from the Porto-Primavera Hydroelectric power station area, Brazil

    Directory of Open Access Journals (Sweden)

    Marcelo B Labruna

    2002-12-01

    Full Text Available From June 2000 to June 2001, a total of 741 ticks were collected from 51 free-living wild animals captured at the Porto-Primavera Hydroelectric power station area, located alongside an approximately 180 km course of the Paraná river, between the states of São Paulo and Mato Grosso do Sul, comprising 9 species of 3 genera: Ambly-omma (7 species, Boophilus (1 and Anocentor (1. A total of 421 immature Amblyomma ticks were reared in laboratory until the adult stage, allowing identification of the species. A. cajennense was the most frequent tick species (mostly immature stages collected on 9 host species: Myrmecophaga tridactyla, Tamandua tetradactyla,Cerdocyon thous, Puma concolor,Tayassu tajacu, Mazama gouazoubira,Hydrochaeris hydrochaeris,Alouatta caraya, Cebus apella. Other tick species were less common, generally restricted to certain host taxa.

  3. Herpetofauna, Santa Edwiges I and II hydroelectric power plants, state of Goiás, Brazil

    Directory of Open Access Journals (Sweden)

    Cintra, C. E. D.

    2009-01-01

    Full Text Available This paper presents a check list of amphibians and reptiles of the area under the influence of Santa Edwiges I and IIsmall hydroelectric power plants on Rio Buritis, state of Goiás, Brazil. The list was the result of faunal rescueoperations carried out between 31 August and 29 September 2005 (Santa Edwiges II and between 30 July and 12September 2006 (Santa Edwiges I. The list comprises 30 species of amphibians belonging to 16 genera and 8 families(Caeciliidae, Bufonidae, Cycloramphidae, Hylidae, Brachycephalidae, Leiuperidae, Leptodactylidae, andMicrohylidae, and 45 species of reptiles belonging to 38 genera and 16 families (Amphisbaenidae, Anguidae,Gekkonidae, Gymnophtalmidae, Polychrotidae, Scincidae, Teiidae, Tropiduridae, Anomalepididae, Leptotyphlopidae,Typhlopidae, Boidae, Colubridae, Dipsadidae, Elapidae, and Viperidae.

  4. REFINED MATHEMATICAL MODEL OF HYDROELECTRIC DRIVE OF THE CRYSTALLIZER ROLLING OF HIGH-SPEED MNLZ

    Directory of Open Access Journals (Sweden)

    V. V. Bolotskij

    2004-01-01

    Full Text Available At present time the high emphasis is placed on the problems of the quality improvement and increase of the metal cast speed at the machines of the slugs continuous casting. One of the ways of solving of this task is using of hydroelectric drive of the mechanism of the crystallizer swinging, which allows to vary frequency and amplitude of swinging and also to change the principle of crystallizer. In the work there is presented the improved mathematical model of the crystallizer swinging mechanism in the form of the automatic control system, using of which one can investigate the influence of different parameters of the system on quality and productivity of the machines of the slugs continuous casting.

  5. Legal obstacles and incentives to the development of small scale hydroelectric power in Vermont

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Vermont are discussed. The dual regulatory system involving state and Federal governments is discussed followed by discussions on property interests; direct regulation by the Public Service Board; indirect regulation; and financial considerations. An initial step required of any developer is that of real property acquisition. Ordinarily this involves acquiring the stream bed, land along the stream banks, and land needed for the impoundment reservoir. Ownership of land along the stream banks places the developer in the position of a riparian owner. This status is important in that only riparian owners are entitled to a reasonable use of the flowing water. In addition to acquisition by sale, lease, or gift, Vermont law allows certain developers to acquire property via eminent domain. Some general rules which have evolved as riparian law and applied in Vermont are discussed.

  6. Integration of Lithium-Ion Battery Storage Systems in Hydroelectric Plants for Supplying Primary Control Reserve

    Directory of Open Access Journals (Sweden)

    Fabio Bignucolo

    2017-01-01

    Full Text Available The ever-growing diffusion of renewables as electrical generation sources is forcing the electrical power system to face new and challenging regulation problems to preserve grid stability. Among these, the primary control reserve is reckoned to be one of the most important issues, since the introduction of generators based on renewable energies and interconnected through static converters, if relieved from the primary reserve contribution, reduces both the system inertia and the available power reserve in case of network events involving frequency perturbations. In this scenario, renewable plants such as hydroelectric run-of-river generators could be required to provide the primary control reserve ancillary service. In this paper, the integration between a multi-unit run-of-river power plant and a lithium-ion based battery storage system is investigated, suitably accounting for the ancillary service characteristics as required by present grid codes. The storage system is studied in terms of maximum economic profitability, taking into account its operating constraints. Dynamic simulations are carried out within the DIgSILENT PowerFactory 2016 software environment in order to analyse the plant response in case of network frequency contingencies, comparing the pure hydroelectric plant with the hybrid one, in which the primary reserve is partially or completely supplied by the storage system. Results confirm that the battery storage system response to frequency perturbations is clearly faster and more accurate during the transient phase compared to a traditional plant, since time delays due to hydraulic and mechanical regulations are overpassed. A case study, based on data from an existing hydropower plant and referring to the Italian context in terms of operational constraints and ancillary service remuneration, is presented.

  7. Modelling CO2emissions from water surface of a boreal hydroelectric reservoir.

    Science.gov (United States)

    Wang, Weifeng; Roulet, Nigel T; Kim, Youngil; Strachan, Ian B; Del Giorgio, Paul; Prairie, Yves T; Tremblay, Alain

    2018-01-15

    To quantify CO 2 emissions from water surface of a reservoir that was shaped by flooding the boreal landscape, we developed a daily time-step reservoir biogeochemistry model. We calibrated the model using the measured concentrations of dissolved organic and inorganic carbon (C) in a young boreal hydroelectric reservoir, Eastmain-1 (EM-1), in northern Quebec, Canada. We validated the model against observed CO 2 fluxes from an eddy covariance tower in the middle of EM-1. The model predicted the variability of CO 2 emissions reasonably well compared to the observations (root mean square error: 0.4-1.3gCm -2 day -1 , revised Willmott index: 0.16-0.55). In particular, we demonstrated that the annual reservoir surface effluxes were initially high, steeply declined in the first three years, and then steadily decreased to ~115gCm -2 yr -1 with increasing reservoir age over the estimated "engineering" reservoir lifetime (i.e., 100years). Sensitivity analyses revealed that increasing air temperature stimulated CO 2 emissions by enhancing CO 2 production in the water column and sediment, and extending the duration of open water period over which emissions occur. Increasing the amount of terrestrial organic C flooded can enhance benthic CO 2 fluxes and CO 2 emissions from the reservoir water surface, but the effects were not significant over the simulation period. The model is useful for the understanding of the mechanism of C dynamics in reservoirs and could be used to assist the hydro-power industry and others interested in the role of boreal hydroelectric reservoirs as sources of greenhouse gas emissions. Copyright © 2017 Elsevier B.V. All rights reserved.

  8. Underground Pumped Storage Hydroelectricity using Abandoned Works (open pits and deep mines)

    Science.gov (United States)

    Pujades, E.; Willems, T.; Bodeux, S.; Orban, P.; Dassargues, A.

    2015-12-01

    Pumped Storage Hydroelectricity (PSH) is a good alternative to increase the efficiency of power plants, which cannot regulate the amount of electricity generated according to the demand (wind, solar or even nuclear power plants). PSH plants, which consist in two reservoirs located at different heights (upper and lower), can store energy during low demand periods (pumping water from the lower to the upper reservoir) and generate electricity during the high demand peaks (falling water from the upper to the lower reservoir). Given that the two reservoirs must be located at different heights, PSH plants cannot be constructed in flat regions. Nevertheless, in these regions, an alternative could be to use abandoned underground works (open pits or deep mines) as lower reservoirs to construct Underground Pumped Storage Hydroelectricity (UPSH) plants. To select the best place to construct a plant, two considerations must be taken into account regarding the interaction between UPSH plants and groundwater: 1) the alteration of the natural conditions of aquifers and 2), the efficiency of the plant since the electricity generated depends on the hydraulic head inside the underground reservoir. Obviously, a detailed numerical model must be necessary before to select a location. However, a screening methodology to reject the most disadvantageous sites in a short period of time would be useful. Groundwater flow impacts caused by UPSH plants are analyzed numerically and the main variables involved in the groundwater evolution are identified. The most noticeable effect consists in an oscillation of the groundwater. The hydraulic head around which groundwater oscillates, the magnitude of the oscillations and the time to achieve a "dynamic steady state" depend on the boundaries, the parameters of the aquifer and the characteristics of the underground reservoir. A screening methodology is proposed to assess the main impacts caused in aquifers by UPSH plants. Finally, the efficiency

  9. Spatial variation of sediment mineralization supports differential CO2 emissions from a tropical hydroelectric reservoir

    Directory of Open Access Journals (Sweden)

    Simone Jaqueline Cardoso

    2013-04-01

    Full Text Available Substantial amounts of organic matter (OM from terrestrial ecosystems are buried as sediments in inland waters. It is still unclear to what extent this OM constitutes a sink of carbon, and how much of it is returned to the atmosphere upon mineralization to carbon dioxide (CO2. The construction of reservoirs affects the carbon cycle by increasing OM sedimentation at the regional scale. In this study we determine the OM mineralization in the sediment of three zones (river, transition and dam of a tropical hydroelectric reservoir in Brazil as well as identify the composition of the carbon pool available for mineralization. We measured sediment OC mineralization rates and related them to the composition of the OM, bacterial abundance and pCO2 of the surface water of the reservoir. Terrestrial OM was an important substrate for the mineralization. In the river and transition zones most of the OM was allochthonous (56 % and 48 %, respectively while the dam zone had the lowest allochthonous contribution (7 %. The highest mineralization rates were found in the transition zone (154.80 ± 33.50 mg C m-2 d-1 and the lowest in the dam (51.60 ± 26.80 mg C m-2 d-1. Moreover, mineralization rates were significantly related to bacterial abundance (r2 = 0.50, p < 0.001 and pCO2 in the surface water of the reservoir (r2 = 0.73, p < 0.001. The results indicate that allochthonous OM has different contributions to sediment mineralization in the three zones of the reservoir. Further, the sediment mineralization, mediated by heterotrophic bacteria metabolism, significantly contributes to CO2 supersaturation in the water column, resulting in higher pCO2 in the river and transition zones in comparison with the dam zone, affecting greenhouse gas emission estimations from hydroelectric reservoirs.

  10. Spatial variation of sediment mineralization supports differential CO2 emissions from a tropical hydroelectric reservoir.

    Science.gov (United States)

    Cardoso, Simone J; Vidal, Luciana O; Mendonça, Raquel F; Tranvik, Lars J; Sobek, Sebastian; Fábio, Roland

    2013-01-01

    Substantial amounts of organic matter (OM) from terrestrial ecosystems are buried as sediments in inland waters. It is still unclear to what extent this OM constitutes a sink of carbon, and how much of it is returned to the atmosphere upon mineralization to carbon dioxide (CO2). The construction of reservoirs affects the carbon cycle by increasing OM sedimentation at the regional scale. In this study we determine the OM mineralization in the sediment of three zones (river, transition, and dam) of a tropical hydroelectric reservoir in Brazil as well as identify the composition of the carbon pool available for mineralization. We measured sediment organic carbon mineralization rates and related them to the composition of the OM, bacterial abundance and pCO2 of the surface water of the reservoir. Terrestrial OM was an important substrate for the mineralization. In the river and transition zones most of the OM was allochthonous (56 and 48%, respectively) while the dam zone had the lowest allochthonous contribution (7%). The highest mineralization rates were found in the transition zone (154.80 ± 33.50 mg C m(-) (2) d(-) (1)) and the lowest in the dam (51.60 ± 26.80 mg C m(-) (2) d(-) (1)). Moreover, mineralization rates were significantly related to bacterial abundance (r (2) = 0.50, p reservoir (r (2) = 0.73, p sediment mineralization in the three zones of the reservoir. Further, the sediment mineralization, mediated by heterotrophic bacteria metabolism, significantly contributes to CO2 supersaturation in the water column, resulting in higher pCO2 in the river and transition zones in comparison with the dam zone, affecting greenhouse gas emission estimations from hydroelectric reservoirs.

  11. Influence of environmental variables on diffusive greenhouse gas fluxes at hydroelectric reservoirs in Brazil

    Directory of Open Access Journals (Sweden)

    JP. Rogério

    Full Text Available For almost two decades, studies have been under way in Brazil, showing how hydroelectric reservoirs produce biogenic gases, mainly methane (CH4 and carbon dioxide (CO2, through the organic decomposition of flooded biomass. This somewhat complex phenomenon is due to a set of variables with differing levels of interdependence that directly or indirectly affect greenhouse gas (GHG emissions. The purpose of this paper is to determine, through a statistical data analysis, the relation between CO2, CH4 diffusive fluxes and environmental variables at the Furnas, Itumbiara and Serra da Mesa hydroelectric reservoirs, located in the Cerrado biome on Brazil's high central plateau. The choice of this region was prompted by its importance in the national context, covering an area of some two million square kilometers, encompassing two major river basins (Paraná and Tocantins-Araguaia, with the largest installed power generation capacity in Brazil, together accounting for around 23% of Brazilian territory. This study shows that CH4 presented a moderate negative correlation between CO2 and depth. Additionally, a moderate positive correlation was noted for pH, water temperature and wind. The CO2 presented a moderate negative correlation for pH, wind speed, water temperature and air temperature. Additionally, a moderate positive correlation was noted for CO2 and water temperature. The complexity of the emission phenomenon is unlikely to occur through a simultaneous understanding of all the factors, due to difficulties in accessing and analyzing all the variables that have real, direct effects on GHG production and emission.

  12. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer winter and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.

  13. Model for energy planning of degraded river basins based on hydrological evaluation of hydroelectric reservoirs in operation; Modelo de planejamento energetico de bacias hidrograficas degradadas baseado na avaliacao hidrica de reservatorios hidreletricos em operacao

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Afonso Henriques Moreira [Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Ferreira, Aloisio Caetano; Ottoni, Arthur Benedicto; Nogueira Neto, Claudio; Silva, Denis de Souza

    2008-07-01

    The human occupation of the hydrographic basin, made in the past without plans, generated alteration of the hydrology characteristics, presenting as direct consequence modifications of its hydric availabilities. Or either, the floods in the rainy periods and the droughts in the ones of dryness currently tend to be more frequent and with bigger intensity. These conditions have affected the operation as well as the planning of the hydroelectric reservoirs, that have generated energy in conditions of different hydric availabilities (worse) of those foreseeing at the time of the project. These situations result in uncertainties and energy losses for the investor as well as in the system. Under such premises, the present article analyzes the energy-economic influences of the deterioration of the hydric regimen of some on exploitations in operation to the system, located in basins degrades in the South, Southeastern and Northeast regions; enhancing the importance of the studies of hydric economy of these units of management (degraded basins) as subsidy of taking of decision for gradual recovery of its hydric availabilities; taking in account the energy optimization of the hydroelectric reservoirs in located operation as well as the minimization of inherent the financial losses to the uncertainties of its hydric resources. (author)

  14. Case studies of the legal and institutional obstacles and incentives to the development of small-scale hydroelectric power: Bull Run, Portland, Oregon

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-05-01

    The National Conference of State Legislatures' Small-Scale Hydroelectric Policy Project is designed to assist selected state legislatures in looking at the benefits that a state can derive from the development of small-scale hydro, and in carrying out a review of state laws and regulations that affect the development of the state's small-scale hydro resources. The successful completion of the project should help establish state statutes and regulations that are consistent with the efficient development of small-scale hydro. As part of the project's work with state legislatures, seven case studies of small-scale hydro sites were conducted to provide a general analysis and overview of the significant problems and opportunities for the development of this energy resource. The case study approach was selected to expose the actual difficulties and advantages involved in developing a specific site. Such an examination of real development efforts will clearly reveal the important aspects about small-scale hydro development which could be improved by statutory or regulatory revision. Moreover, the case study format enables the formulation of generalized opportunities for promoting small-scale hydro based on specific development experiences. The case study for small-scale hydro power development at the City of Portland's water reserve in the Bull Run Forest is presented with information included on the Bull Run hydro power potential, current water usage, hydro power regulations and plant licensing, technical and economic aspects of Bull Run project, and the environmental impact. (LCL)

  15. A parallel between the impacts of hydroelectric and thermoelectric power plants; Um paralelo entre os impactos das usinas hidreletricas e termoeletricas

    Energy Technology Data Exchange (ETDEWEB)

    Guerra, Sinclair M.G.; Carvalho, Antomar V. de [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica

    1995-07-01

    An evaluation of the environmental impacts of hydroelectric and thermoelectric power plants using the Leopold method is presented. The evaluation includes impacts on the physical, biological and socio-economic sectors. 8 refs., 3 figs., 2 tabs.

  16. Drought Impacts on Reservoir Storage and Hydro-electricity Production in Southeastern Brazil

    Science.gov (United States)

    Scanlon, B. R.; Melo, D. D.; Yin, L.; Wendland, E.

    2015-12-01

    Brazilian hydroelectric plants (HP) generate ~85% of the total electricity in the country (138 GW). More than half of the number largest reservoirs are located in the Southeast/Midwest region, where ~50% of the population (~100 million) lives. The 2014 drought raised several questions about the resilience of the water sources when several urban centers, including Brazilian's largest metropolis (São Paulo, 20 million people), had their water supply threatened. Such drought also affected reservoirs of hydroelectric plants. This study assesses how the storage and, thus the electricity generation, in 14 of the largest reservoirs were affected by drought events within the past 20 years. We computed the Standardized Precipitation Index (SPI) to identify rainfall anomalies throughout the analyzed period. To evaluate the impacts on surface water, we assessed the changes in total (surface+ subsurface) runoff and soil moisture from Global Land Data Assimilation System (GLDAS) and in Total Water Storage (TWS) from Gravity Recovery and Climate Experiment (GRACE) satellite data. We evaluated the anomalies and significance of the changes in reservoir storage (RS) and electricity generation. The results show that severe dry years (-1.5 < SPI <-2.0) reduce reservoir storage (RS) by up to ~60% of its total capacity. Both electricity generation and reservoir storage showed strong negative trends between 2011 and 2014. Our results also indicate that within the past 20 years, two major depletions in reservoir storage occurred: 2001 and 2014. However, due to lower soil moisture in 2013 compared to that in 2000, distinct impacts were observed on the reservoirs with much stronger impacts on reservoir storage in 2014 relative to those in 2001. No meaningful changes in runoff were shown by GLDAS during the 2014 drought. The observed depletion in the RS in 2014 was similar to that in the TWS, as shown by GRACE data. In 2014, the electricity production by the HP declined by ~20%. As a

  17. RECOVERY OF AN OXISOL DEGRADED BY THE CONSTRUCTION OF A HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    Joseane Carina Borges de Carvalho

    2015-12-01

    Full Text Available ABSTRACT The removal of thick layers of soil under native scrubland (Cerrado on the right bank of the Paraná River in Selvíria (State of Mato Grosso do Sul, Brazil for construction of the Ilha Solteira Hydroelectric Power Plant caused environmental damage, affecting the revegetation process of the stripped soil. Over the years, various kinds of land use and management systems have been tried, and the aim of this study was to assess the effects of these attempts to restore the structural quality of the soil. The experiment was conducted considering five treatments and thirty replications. The following treatments were applied: stripped soil without anthropic intervention and total absence of plant cover; stripped soil treated with sewage sludge and planted to eucalyptus and grass a year ago; stripped soil developing natural secondary vegetation (capoeira since 1969; pastureland since 1978, replacing the native vegetation; and soil under native vegetation (Cerrado. In the 0.00-0.20 m layer, the soil was chemically characterized for each experimental treatment. A 30-point sampling grid was used to assess soil porosity and bulk density, and to assess aggregate stability in terms of mean weight diameter (MWD and geometric mean diameter (GMD. Aggregate stability was also determined using simulated rainfall. The results show that using sewage sludge incorporated with a rotary hoe improved the chemical fertility of the soil and produced more uniform soil pore size distribution. Leaving the land to develop secondary vegetation or turning it over to pastureland produced an intermediate level of structural soil quality, and these two treatments produced similar results. Stripped soil without anthropic intervention was of the lowest quality, with the lowest values for cation exchange capacity (CEC and macroporosity, as well as the highest values of soil bulk density and percentage of aggregates with diameter size <0.50 mm, corroborated by its lower

  18. A model optimization for pre-dispatch among the hydroelectric generator unities; Um modelo de otimizacao para pre-despacho entre as unidades geradoras de hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Colnago, Glauber R.; Correia, Paulo B. [Universidade Estadual de Campinas (UNICAMP), Campinas, SP (Brazil). Faculdade de Engenharia Mecanica]. E-mails: grcolnago@fem.unicamp.br; pcorreia@fem.unicamp.br

    2006-07-01

    This work proposes a mixed integer nonlinear programming model to pre-dispatch of a hydroelectric power plant. In the model we want to minimize the losses in the electricity generation with conditions of electricity demand, operational prohibited zones and units' efficiency data. The Xingo Hydroelectric Power Plant was utilized in the mode tests. The solver used was Lingo 8.0. (author)

  19. A UK guide to intake fish-screening regulations, policy and best practice with particular reference to hydroelectric power schemes

    Energy Technology Data Exchange (ETDEWEB)

    Turnpenny, A.W.H.; Struthers, G.; Hanson, P.

    1998-07-01

    A review of fish screening regulations in England, Wales, Scotland, and Northern Ireland is presented, and a summary of findings on screening legislation is given. The views of hydroelectric scheme developers, owners and operators are considered, and recommendations including the development of a risk assessment procedure are discussed. Fish screening technology, bypasses and other escape routes, and common fault in screen design and operation are examined, and guidance to Best Practice is given. (UK)

  20. Executive summary: legal obstacles and incentives to small-scale hydroelectric development in the six middle atlantic states

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The executive summary describes the relationship of Federal law and regulation to state law and regulation of small-scale hydroelectric facilities, highlighting important features of the constitutional, statutory, case law, and regulations of each of the six middle atlantic states (Maryland, Delaware, New York, New Jersey, Pennsylvania, and Virginia). Water law, direct and indirect regulation, and financial considerations for each state are presented. A flow diagram of regulation of small dams in each state is also included.

  1. Problems of hydroelectric development at existing dams: an analysis of institutional, economic, and environmental restraints in Pennsylvania, New Jersey, and Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.J.; Green, L.L.

    1979-04-01

    The methodology that has been developed to analyze the impact of possible government actions on the development of small-scale hydroelectric power in the United States is described. The application of the methodology to a specific region of the United States is also described. Within the Pennsylvania-New Jersey-Maryland (PJM) region, the methodology has been used to evaluate the significance of some of the existing institutional and economic constraints on hydroelectric development at existing dams. The basic process for the analysis and evaluation is estimation of the hydroelectric energy that can be developed for a given price of electricity. Considering the present constraints and a geographical region of interest, one should be able to quantify the potential hydroelectric energy supply versus price. Estimates of how the supply varies with possible changes in governmental policies, regulations, and actions should assist the government in making decisions concerning these governmental functions relative to hydroelectric development. The methodology for estimating the hydroelectric supply at existing dams is included.

  2. Time and cost over-runs of the power projects in Kerala

    OpenAIRE

    N. Vijayamohanan Pillai; K.P. Kannan

    2001-01-01

    Delays in project implementation and the attendant cost overruns have been a regular feature in the electric power sector in Kerala. Almost all the public projects, including the prestigious major hydroelectric project of Idukki, have been the unfortunate victims of time and cost overruns on account of a number of avoidable factors, labour disputes being singled out as the prime villain. In this paper we take up a detailed analysis of the cost of inefficiency involved in the time and cost ove...

  3. The Effect of Hydroelectric Power Plants (hpp) on Agro-Life at Rural Land Regulation in Turkey

    Science.gov (United States)

    Onursal Denli, G.; Denli, H. H.; Seker, D. Z.; Bitik, E.; Cetin, S.

    2014-12-01

    Turkey is one of the self-sufficient in foodstuffs and globally ranks as 7th significant agricultural exporter in the world. Main trading partners are the European Union, the United States and the Middle East. As known, agricultural production is dependent on factors including efficient and effective use of all inputs ranging from those natural resources as in land and water to well-trained human resources as labour at the production. The socio-economic aspects of this sector take several forms ranging from the incomes of the primary producers. Rural land regulation is a necessity for rural areas and is regarded as a useful instrument for improving farmer's incomes and life standards. The irrigation system, established during the rural regulation/land consolidation period of large-scale farming, is insufficiently adjusted to the new land tenure structures. The government is especially in the process of water management with hydroelectric power plants. This process produces energy that is required but effects negatively the rivers and agricultural, environmental, climatic conditions. Rivers are vessels of the nature. Free flowing rivers give life to all nature. Most of the studies indicate that Hydroelectric Power Plants (HPP) affects the surface and ground-water management, natural life, agricultural productivity, socio-economic situation at agricultural regions and agro-life related with immigration. This study emphasizes the effect of Hydroelectric Power Plants which are used in transformation of water as a renewable natural resource into electricity power from the perspective of environmental policies and rural regulation.

  4. Fish & Wildlife Annual Project Summary, 1983.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1984-07-01

    BPA's Division of Fish and Wildlife was created in 1982 to develop, coordinate and manage BPA's fish and wildlife program. Division activities protect, mitigate, and enhance fish and wildlife resources impacted by hydroelectric development and operation in the Columbia River Basin. At present the Division spends 95% of its budget on restoration projects. In 1983, 83 projects addressed all aspects of the anadromous fish life cycle, non-migratory fish problems and the status of wildlife living near reservoirs.

  5. CFD evaluation of added damping due to fluid flow over a hydroelectric turbine blade

    Science.gov (United States)

    Gauthier, J. P.; Giroux, A. M.; Etienne, S.; Gosselin, F. P.

    2016-11-01

    To estimate structural fatigue, vibrational response to realistic spectrum of excitations and associated equivalent damping are of paramount importance. In this paper, an approach to quantify flow-induced damping of a relatively heavy fluid on a vibrating hydraulic turbine blade using numerical simulations is presented. First, mode shapes and frequencies of the immersed structure are obtained by modal analysis using the finite element method. Then, forced oscillatory modal motion is prescribed on the structural boundary of unsteady Reynolds-averaged Navier-Stokes flow simulations. Damping is finally computed as the normalized work done by the resulting fluid load on the structure. Validation is achieved by comparing the numerical results with available experimental data for a steel hydrofoil oscillating in flowing water. For this case, the linear increase in the damping ratio with the flow velocity is reproduced within 10% of the experimental values. Application of the method to an actual hydroelectric propeller turbine blade yields a fluid damping value of around 15% of critical damping for its first vibration mode.

  6. Determination of methane emissions in three hydroelectric dams in Costa Rica

    Directory of Open Access Journals (Sweden)

    Jorge Herrera

    2013-12-01

    Full Text Available The emission fluxes of methane (CH4 across air–water interface were measured in three hydroelectric dams in Costa Rica (Brasil, Nuestro Amo and Cote Lake during three years cycle (2009-2011, using the floating static chamber technique. Samples were taken during one week, both day and night time, through four campaigns per year. For the methane flux determination the water surface was divided in a 4x4 grid equally spaced. During this period, CH4 fluxes showed average values that ranged from 759 – 4282 (Brasil, 77 – 733 (Nuestro Amo and 10,9 – 44,2 mg CH4 m-2 d-1 (Cote Lake, respectively. The fluxes of CH4 showed both strong seasonal and diurnal variations. CH4 emission rate was highest in dry season and there was a significant difference for CH4 emissions between day and night, the ratios between nighttime to daytime methane flux increased from 0,35 to 0,72, 0,43 to 0,64 for Brasil and Nuestro Amo, respectively in this season. CH4 emission was correlated positively with soil temperature, water table and chlorophyll a water concentrations.

  7. Influence of peak flow changes on the macroinvertebrate drift downstream of a Brazilian hydroelectric dam.

    Science.gov (United States)

    Castro, D M P; Hughes, R M; Callisto, M

    2013-11-01

    Successive daily peak flows from hydropower plants can disrupt aquatic ecosystems and alter the composition and structure of macroinvertebrates downstream. We evaluated the influence of peak flow changes on macroinvertebrate drift downstream of a hydroelectric plant as a basis for determining ecological flows that might reduce the disturbance of aquatic biota. The aim of this study was to assess the influence of flow fluctuations on the seasonal and daily drift patterns of macroinvertebrates. We collected macroinvertebrates during fixed flow rates (323 m3.s-1 in the wet season and 111 m3.s-1 in the dry season) and when peak flows fluctuated (378 to 481 m3.s-1 in the wet season, and 109 to 173 m3.s-1 in the dry season) in 2010. We collected 31,924 organisms belonging to 46 taxa in the four sampling periods. Taxonomic composition and densities of drifting invertebrates differed between fixed and fluctuating flows, in both wet and dry seasons, but family richness varied insignificantly. We conclude that macroinvertebrate assemblages downstream of dams are influenced by daily peak flow fluctuations. When making environmental flow decisions for dams, it would be wise to consider drifting macroinvertebrates because they reflect ecological changes in downstream biological assemblages.

  8. Impacts of hydroelectric dams on alluvial riparian plant communities in eastern Brazilian Amazonian

    Directory of Open Access Journals (Sweden)

    LEANDRO VALLE FERREIRA

    2013-09-01

    Full Text Available The major rivers of the Amazon River basin and their biota are threatened by the planned construction of large hydroelectric dams that are expected to have strong impacts on floodplain plant communities. The present study presents forest inventories from three floodplain sites colonized by alluvial riparian vegetation in the Tapajós, Xingu and Tocantins River basins in eastern Amazonian. Results indicate that tree species of the highly specialized alluvial riparian vegetation are clearly distinct among the three river basins, although they are not very distinct from each other and environmental constraints are very similar. With only 6 of 74 species occurring in all three inventories, most tree and shrub species are restricted to only one of the rivers, indicating a high degree of local distribution. Different species occupy similar environmental niches, making these fragile riparian formations highly valuable. Conservation plans must consider species complementarily when decisions are made on where to place floodplain forest conservation units to avoid the irreversible loss of unique alluvial riparian vegetation biodiversity.

  9. Hydroelectric microcentrals for small consumption centers; Microcentrales hidroelectricas para pequenos centros de consumo

    Energy Technology Data Exchange (ETDEWEB)

    Angeles A, V. H.; Espino C, F. P. [Universidad Autonoma Metropolitana, Mexico, D. F. (Mexico); Buitron Sanchez, H. C. [Programa de Ahorro de Energia para el Sector Electrico, Mexico, D. F. (Mexico)

    1995-12-31

    The utilization of alternate energy sources (wind power, solar and hydro to small scale) represents an option for the rural electrification. This paper analyzes the case of hydro microgeneration, for this purpose the mechanical and electrical fitting are mainly discussed. For the mechanical re-equipment the turbine types that can be used are fundamentally presented and how they can be selected. As to the electrical re-equipment the different types of electric generators are discussed, as well as the form of selecting them, the operation, the control and the protection in the hydroelectric microcentrals. [Espanol] La utilizacion de fuentes alternas de energia (eolica, solar e hidraulica a pequena escala) representan una alternativa para la electrificacion rural. Este trabajo trata del caso de la microgeneracion hidraulica para la cual se discuten principalmente, alternativas para el equipamiento mecanico y electrico. Para el equipamiento mecanico se presentan fundamentalmente los tipos de turbinas que pueden ser utilizadas y como se pueden seleccionar. En cuanto al equipo electrico se manejan los diferentes tipos de generadores, la forma de seleccionarlos, la operacion, el control y la proteccion en las microcentrales hidroelectricas.

  10. Probabilistic streamflow forecasting for hydroelectricity production: A comparison of two non-parametric system identification algorithms

    Science.gov (United States)

    Pande, Saket; Sharma, Ashish

    2014-05-01

    This study is motivated by the need to robustly specify, identify, and forecast runoff generation processes for hydroelectricity production. It atleast requires the identification of significant predictors of runoff generation and the influence of each such significant predictor on runoff response. To this end, we compare two non-parametric algorithms of predictor subset selection. One is based on information theory that assesses predictor significance (and hence selection) based on Partial Information (PI) rationale of Sharma and Mehrotra (2014). The other algorithm is based on a frequentist approach that uses bounds on probability of error concept of Pande (2005), assesses all possible predictor subsets on-the-go and converges to a predictor subset in an computationally efficient manner. Both the algorithms approximate the underlying system by locally constant functions and select predictor subsets corresponding to these functions. The performance of the two algorithms is compared on a set of synthetic case studies as well as a real world case study of inflow forecasting. References: Sharma, A., and R. Mehrotra (2014), An information theoretic alternative to model a natural system using observational information alone, Water Resources Research, 49, doi:10.1002/2013WR013845. Pande, S. (2005), Generalized local learning in water resource management, PhD dissertation, Utah State University, UT-USA, 148p.

  11. Overview of, and demands on, small hydroelectric turbines; Kleinwasserturbinen, Ueberblick und Anforderungen

    Energy Technology Data Exchange (ETDEWEB)

    Lein, G. [Stuttgart Univ. (Germany). Inst. fuer Stroemungsmechanik und Hydraulische Stroemungsmaschinen

    1997-12-31

    The report deals with some aspects of small hydroelectric turbines which the reporter`s experience has proved to be relevant. Although this experience derives in part from larger units, most of it holds true also of small turbines. The report does not restrict itself to the high-tech conditions of central Europe. A brief overview of turbine types is given. Questions of the choice and construction of turbines, and questions relating to guarantees and their verification are discussed. Some important standards, norms and guidelines which apply to small turbines are pointed out. (orig.) [Deutsch] Im folgenden Bericht werden einige Aspekte von Kleinwasserturbinen angesprochen, die nach der Erfahrung des Berichters von Wichtigkeit sind. Wenn diese Erfahrungen auch zum Teil an groesseren Einheiten gewonnen wurden, so sind sie doch ueberwiegend auch fuer Kleinturbinen gueltig. Der Bericht beschraenkt sich dabei nicht auf Verhaeltnisse in unserem hochtechnisierten mitteleuropaeischen Raum. Nach einem kurzen Ueberblick ueber die Turbinentypen werden Fragen der Turbinenauswahl und -konstruktion und der Garantien und deren Nachweis angesprochen. Schliesslich wird eine Uebersicht ueber einige wichtige Standards, Normen und Richtlinien, die auf Kleinturbinen angewendet werden koennen, gegeben. (orig.)

  12. Tradeoffs for Renewable Energy Projects: Environmental, Planning, and Mission Considerations

    Science.gov (United States)

    2010-04-01

    wind stress. Solar energy is also responsible for the distribution of precipitation that is tapped by hydroelectric projects, and for the growth of...These plant or plant-derived materials (e.g., wood, paper, manure , sewage and waste, algae and aquatic plants, and ag- ricultural crops) can be...directly in a diesel engine, or they can be chemically processed to produce fuels such as “biodiesel.” In recent years, such cropland conver- sion has

  13. Impacts of the Columbia River hydroelectric system on main-stem habitats of fall chinook salmon

    Science.gov (United States)

    Dauble, D.D.; Hanrahan, T.P.; Geist, D.R.; Parsley, M.J.

    2003-01-01

    Salmonid habitats in main-stem reaches of the Columbia and Snake rivers have changed dramatically during the past 60 years because of hydroelectric development and operation. Only about 13% and 58% of riverine habitats in the Columbia and Snake rivers, respectively, remain. Most riverine habitat is found in the upper Snake River; however, it is upstream of Hells Canyon Dam and not accessible to anadromous salmonids. We determined that approximately 661 and 805 km of the Columbia and Snake rivers, respectively, were once used by fall chinook salmon Oncorhynchus tshawytscha for spawning. Fall chinook salmon currently use only about 85 km of the main-stem Columbia River and 163 km of the main-stem Snake River for spawning. We used a geomorphic model to identify three river reaches downstream of present migration barriers with high potential for restoration of riverine processes: the Columbia River upstream of John Day Dam, the Columbia-Snake-Yakima River confluence, and the lower Snake River upstream of Little Goose Dam. Our analysis substantiated the assertion that historic spawning areas for fall chinook salmon occurred primarily within wide alluvial floodplains, which were once common in the mainstem Columbia and Snake rivers. These areas possessed more unconsolidated sediment and more bars and islands and had lower water surface slopes than did less extensively used areas. Because flows in the main stem are now highly regulated, the predevelopment alluvial river ecosystem is not expected to be restored simply by operational modification of one or more dams. Establishing more normative flow regimes - specifically, sustained peak flows for scouring - is essential to restoring the functional characteristics of existing, altered habitats. Restoring production of fall chinook salmon to any of these reaches also requires that population genetics and viability of potential seed populations (i.e., from tributaries, tailrace spawning areas, and hatcheries) be considered.

  14. Potential Coastal Pumped Hydroelectric Energy Storage Locations Identified using GIS-based Topographic Analysis

    Science.gov (United States)

    Parsons, R.; Barnhart, C. J.; Benson, S. M.

    2013-12-01

    Large-scale electrical energy storage could accommodate variable, weather dependent energy resources such as wind and solar. Pumped hydroelectric energy storage (PHS) and compressed energy storage area (CAES) have life cycle energy and financial costs that are an order of magnitude lower than conventional electrochemical storage technologies. However PHS and CAES storage technologies require specific geologic conditions. Conventional PHS requires an upper and lower reservoir separated by at least 100 m of head, but no more than 10 km in horizontal distance. Conventional PHS also impacts fresh water supplies, riparian ecosystems, and hydrologic environments. A PHS facility that uses the ocean as the lower reservoir benefits from a smaller footprint, minimal freshwater impact, and the potential to be located near off shore wind resources and population centers. Although technologically nascent, today one coastal PHS facility exists. The storage potential for coastal PHS is unknown. Can coastal PHS play a significant role in augmenting future power grids with a high faction of renewable energy supply? In this study we employ GIS-based topographic analysis to quantify the coastal PHS potential of several geographic locations, including California, Chile and Peru. We developed automated techniques that seek local topographic minima in 90 m spatial resolution shuttle radar topography mission (SRTM) digital elevation models (DEM) that satisfy the following criteria conducive to PHS: within 10 km from the sea; minimum elevation 150 m; maximum elevation 1000 m. Preliminary results suggest the global potential for coastal PHS could be very significant. For example, in northern Chile we have identified over 60 locations that satisfy the above criteria. Two of these locations could store over 10 million cubic meters of water or several GWh of energy. We plan to report a global database of candidate coastal PHS locations and to estimate their energy storage capacity.

  15. Mercury methylation rates of biofilm and plankton microorganisms from a hydroelectric reservoir in French Guiana.

    Science.gov (United States)

    Huguet, L; Castelle, S; Schäfer, J; Blanc, G; Maury-Brachet, R; Reynouard, C; Jorand, F

    2010-02-15

    The Petit-Saut ecosystem is a hydroelectric reservoir covering 365km(2) of flooded tropical forest. This reservoir and the Sinnamary Estuary downstream of the dam are subject to significant mercury methylation. The mercury methylation potential of plankton and biofilm microorganisms/components from different depths in the anoxic reservoir water column and from two different sites along the estuary was assessed. For this, reservoir water and samples of epiphytic biofilms from the trunk of a submerged tree in the anoxic water column and from submerged branches in the estuary were batch-incubated from 1h to 3 months with a nominal 1000ng/L spike of Hg(II) chloride enriched in (199)Hg. Methylation rates were determined for different reservoir and estuarine communities under natural nutrient (reservoir water, estuary freshwater) and artificial nutrient (culture medium) conditions. Methylation rates in reservoir water incubations were the highest with plankton microorganisms sampled at -9.5m depth (0.5%/d) without addition of biofilm components. Mercury methylation rates of incubated biofilm components were strongly enhanced by nutrient addition. The results suggested that plankton microorganisms strongly contribute to the total Hg methylation in the Petit-Saut reservoir and in the Sinnamary Estuary. Moreover, specific methylation efficiencies (%Me(199)Hg(net)/cell) suggested that plankton microorganisms could be more efficient methylating actors than biofilm consortia and that their methylation efficiency may be reduced in the presence of biofilm components. Extrapolation to the reservoir scale of the experimentally determined preliminary methylation efficiencies suggested that plankton microorganisms in the anoxic water column could produce up to 27mol MeHg/year. Taking into account that (i) demethylation probably occurs in the reservoir and (ii) that the presence of biofilm components may limit the methylation efficiency of plankton microorganisms, this result is

  16. NOVEL TSUNAMI BARRIERS AND THEIR APPLICATIONS FOR HYDROELECTRIC ENERGY STORAGE, FISH FARMING, AND FOR LAND RECLAMATION

    Directory of Open Access Journals (Sweden)

    Hans J. Scheel

    2014-10-01

    Full Text Available The tsunami hazard can be mitigated if the destructive waves generated from earthquakes and landslides can be reflected by a stable submerged vertical barrier before striking coastal communities or important structures. Building such deep walls by conventional submarine technology is difficult. The present study describes the principle and the erection of such submarine defensive walls by a relatively simple efficient and economic technology. This technology is based on lowering high- strength steel fences with horizontal anchors, or two parallel steel fences with distance holders, into the sea and fixing them with rocks deposited from top. Dredged material like gravel or sand can be used for additional filling. This Tsunami-Flooding Barrier (TFB extends a few meters above sea level and carries on top a concrete supply and service road protected on both sides against storm waves by concrete walls. Replaceable surge stoppers (parapets, wave return walls prevent overtopping and erosion of the seaward barrier face. The TFBs protect the coastline against tsunami and the highest storm waves from hurricanes, but also can provide protection from oil spills or other contaminations from the ocean and thus protect flora, fauna, coral reefs and beaches. Channels and gates allow navigation and can be closed quickly upon a tsunami or storm warning. The construction costs can be eventually compensated by using the reservoirs between coast and barriers for hydroelectric energy storage (using pump-turbines in the barriers or for fish-farming, or alternatively the reservoir can be filled with rocks, rubble, gravel, sand and covered with soil in order to reclaim new land. Tidal energy can be generated by installing turbines within these barriers. Also, this submarine architecture may be applied to protect pillars of bridges and offshore platforms, and for erecting “roads” into the sea to connect near-shore platforms and wind-parks with the coast and

  17. 76 FR 73612 - Lock Hydro Friends Fund XVIII; Upper Hydroelectric LLC; FFP Project 95 LLC; Riverbank Hydro No...

    Science.gov (United States)

    2011-11-29

    ... brief comments up to 6,000 characters, without prior registration, using the eComment system at http... holder to perform any land- disturbing activities or otherwise enter upon lands or waters owned by others...

  18. 78 FR 48185 - Notice of Intent To Contract for Hydroelectric Power Development on the San Juan-Chama Project...

    Science.gov (United States)

    2013-08-07

    ...) 756-2175. Information related to Western's purchasing and/or marketing of the power may be obtained by... diversions, and three tunnels. The Azotea Tunnel Outlet empties into Willow Creek and has the capacity to... transmission lines. Estimate and describe installed capacity and the capacity of the power facilities. Also...

  19. 76 FR 6820 - Contract for Hydroelectric Power Development at the C-Drop, a Feature of the Klamath Project...

    Science.gov (United States)

    2011-02-08

    ... Power Administration's (Western) purchasing and/or marketing the power, contact Ms. Sonja Anderson, Power Marketing Manager, Western Area Power Administration, Sierra Nevada Region, 114 Parkshore Drive... purchasing and/or marketing considerations. Interested entities are invited to submit a proposal on this...

  20. Alaska Regional Energy Resources Planning Project. Phase 2: coal, hydroelectric and energy alternatives. Volume I. Beluga Coal District Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Rutledge, G.; Lane, D.; Edblom, G.

    1980-01-01

    This volume deals with the problems and procedures inherent in the development of the Beluga Coal District. Socio-economic implications of the development and management alternatives are discussed. A review of permits and approvals necessary for the initial development of Beluga Coal Field is presented. Major land tenure issues in the Beluga Coal District as well as existing transportation routes and proposed routes and sites are discussed. The various coal technologies which might be employed at Beluga are described. Transportation options and associated costs of transporting coal from the mine site area to a connecting point with a major, longer distance transportation made and of transporting coal both within and outside (exportation) the state are discussed. Some environmental issues involved in the development of the Beluga Coal Field are presented. (DMC)

  1. Archeological Survey of the Proposed Charity Lake Hydroelectric Project, Upper Smith River Basin, Patrick and Franklin Counties, Virginia.

    Science.gov (United States)

    1986-04-01

    blowing the " drones " (the still’s attendants) into the surrounding trees (Baxter, personal communication 1985). A single round copper vat, not found...boundaries, to test for subsurface features, and to document the general geomorphology of the area. These tests revealed brown silty sands over gray black...include: construction of a sampling design based on topographic, geomorphological , environmental, and other factors; identification of sample units

  2. Anthropic contribution on pollution in hydroelectric reservoirs: the case of Sao Simao's hydroelectric power plant - GO/MG, Brazil; Contribuicao antropica na poluicao de reservatorios hidreletricos: o caso da Usina Hidreletrica de Sao Simao - GO/MG

    Energy Technology Data Exchange (ETDEWEB)

    Fonseca, Gizele Araujo Borba da

    2010-02-15

    This study aimed to evaluate the contribution of anthropogenic pollution in hydroelectric reservoirs through a case study of the Sao Simao Hydropower. The literature relates the problem of eutrophication with the addition of nutrients (nitrogen and phosphorus) in excess, resulting in water pollution. Through data for both tributary rivers and the reservoir, it was found that the Sao Simao dam presents a framework for eutrophication. We made an analysis to see which tributary rivers were the main sources of nutrients released into the waters of the reservoir and a survey of possible human activities that are contributing to the intake of nutrients in these tributaries. (author)

  3. Evaluating the potential for catastrophic fault-rupture-related hazards affecting a key hydroelectric and irrigation region in central Asia

    Science.gov (United States)

    Rust, D.; Korjenkov, A.; Tibaldi, A.; Usmanova, M.

    2009-04-01

    The Toktogul hydroelectric and irrigation scheme is the largest in central Asia, with a reservoir containing almost 20 km3 of water behind a 230 m-high dam. Annually, the scheme generates 1200 MW of electricity that is distributed over Kyrgyzstan, Uzbekistan, Tajikistan, Kazakhstan and Russia. The scheme is vital for the economic, social and agricultural stability and development of the emerging central Asian republics it serves and, since it is no longer administered centrally as it was in Soviet times, is increasingly the focus of cross-border tensions involving competing needs for irrigation water and power supplies. Our work aims to identify and evaluate potential geo-environmental threats to this region for the benefit of stakeholders; with recommendations for measures to mitigate a range of threat scenarios, presented in a user-friendly GIS format. Most notably these scenarios involve the potential for very large magnitude earthquakes, with associated widespread slope instability, occurring on the little known Talas - Fergana fault. This structure, some 700 km long, bisects the Toktogul region within the actively (~20 mm a-1) contracting Tien Shan mountain range and exhibits geological characteristics similar to large strike-slip faults such as the San Andreas. Historical records are limited in this inaccessible mountainous region that, until Soviet times, was occupied by mainly nomadic peoples, but do not indicate recent fault rupture. This highlights the role of geological investigations in assembling a record of past catastrophic events to serve as a guide for what may be expected in the future, as well as the inherent difficulties in attempting geological forecasts to a precision that is useful on human timescales. Such forecasts in this region must also include the presence of some 23 uranium mining waste dumps within the mountain valleys, a legacy from Soviet times, as well as arsenic-rich waste dumps remaining from an earlier era of gold mining. Many

  4. Wildlife Impact Assessment: Anderson Ranch, Black Canyon, and Boise Diversion Projects, Idaho. Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Meuleman, G. Allyn

    1986-05-01

    This report presents an analysis of impacts on wildlife and their habitats as a result of construction and operation of the US Bureau of Reclamation's Anderson Ranch, Black Canyon, and Boise Diversion Projects in Idaho. The objectives were to: (1) determine the probable impacts of development and operation of the Anderson Ranch, Black Canyon, and Boise Diversion Projects to wildlife and their habitats; (2) determine the wildlife and habitat impacts directly attributable to hydroelectric development and operation; (3) briefly identify the current major concerns for wildlife in the vicinities of the hydroelectric projects; and (4) provide for consultation and coordination with interested agencies, tribes, and other entities expressing interest in the project.

  5. Case study analysis of the legal and institutional obstacles and incentives to the development of the hydroelectric power of the Boardman River at Traverse City, Michigan

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    An analytic description of one decision-making process concerning whether or not to develop the hydroelectric potential of the Boardman River is presented. The focus of the analysis is on the factor that the developers considered, or should consider in making a responsible commitment to small-scale hydroelectric development. Development of the Boardman River would occur at the five dam sites. Two existing dams, owned by the county, previously generated hydroelectricity, as did a third before being washed out. One dam has never been utilized. It is owned by the city which also owns the washed-out area. The study concludes that hydroelectric power is feasible at each. Grand Traverse County and Traverse City would engage in a joint venture in developing the resource. Chapter I presents a detailed description of the developers, the river resource, and the contemplated development. Chapter II is an analysis of the factors affecting the decision making process. Chapter III summarizes the impact of the more significant barriers and incentives and presents recommendations that, if implemented, will favorably affect decisions to develop small-scale hydroelectric generation capability.

  6. MODELING AND STUDY OF HYDROELECTRIC GENERATING SETS OF SMALL HYDRO POWER PLANTS WITH FREQUENCY-CONTROLLED PERMANENT MAGNET SYNCHRONOUS GENERATORS

    Directory of Open Access Journals (Sweden)

    R. I. Mustafayev

    2016-01-01

    Full Text Available Currently, the hydroelectric generating sets of small HPPs with Pelton turbines employ as their generating units conventional synchronous generators with electromagnetic excitation. To deal with the torque pulsatile behaviour, they generally install a supplementary flywheel on the system shaft that levels the pulsations. The Pelton turbine power output is adjusted by the needle changing water flow in the nozzle, whose advancement modifies the nozzle area and eventually – the flow. They limit the needle full stroke time to 20–40 sec. since quick shutting the nozzle for swift water flow reduction may result in pressure surges. For quick power adjustment so-called deflectors are employed, whose task is retraction of water jets from the Pelton turbine buckets. Thus, the mechanical method of power output regulation requires agreement between the needle stroke inside the turbine nozzles and the deflector. The paper offers employing frequency-controlled synchronous machines with permanent magnets qua generating units for the hydroelectric generating sets of small HPPs with Pelton turbines. The developed computer model reveals that this provides a higher level of adjustability towards rapid-changing loads in the grid. Furthermore, this will replace the power output mechanical control involving the valuable deflector drive and the turbine nozzle needles with electrical revolution rate and power output regulation by a frequency converter located in the generator stator circuit. Via frequency start, the controllable synchronous machine ensures stable operation of the hydroelectric generating set with negligibly small amount of water (energy carrier. Finally, in complete absence of water, the frequency-relay start facilitates shifting the generator operation to the synchronous capacitor mode, which the system operating parameter fluctograms obtained through computer modeling prove. 

  7. Technological solutions of decentralized generation of hydroelectricity for those demands that cannot be attended by conventional electric with centralized generation

    Energy Technology Data Exchange (ETDEWEB)

    Signoretti, Valdir Tesche; Veras, Carlos Alberto Gurgel Rudi; Els, Henri Van [Universidade de Brasilia, Brasilia, DF (Brazil). Faculdade de Tecnologia. Dept. de Engenharia Mecanica], e-mail: gurgel@unb.br

    2010-07-01

    A source of energy stable and reliable and of acceptable cost is a basic requisite for the development of a given region can give-if full. Access to energy is important basis of human existence, essential to the satisfaction of basic needs such as food, clothing, and housing and also of mobility and communication. However, the dependency world burning of fossil fuels for energy generation and supply of a demand constantly increasing, both in industrialized countries and those in development, already threatening the ecological stability of the Earth. At the same time, conflicts by distribution of the last reserves these resources non-renewable threaten significantly to civil society. Adding to the breakneck speed in which humanity consumes the energetic sources and the obvious devastation of nature has an unequal distribution in consumption and access to energy. Renewable sources and energy efficiency are viable and necessary, especially because they can be the key to reduce wastefulness and extend the access to energy. In this way, there is a significant influence on economic and social inclusion of population excluded, generating employment and income with costs local and global environmental reduced compared to traditional forms and unsustainable generation and use of energy. This work is a study involving issues related to rural electrification from hydroelectricity, especially related to those isolated communities of the Amazon region that are lacking this form of energy, presented a general review since the origins of hydroelectricity in Brazil, as well as a national panorama electric exclusion as well as a scenario Amazon's supply of electricity. Finally presenting-if the main technologies available for hydroelectric generation for these isolated communities. (author)

  8. Establishing baseline biodiversity data prior to hydroelectric dam construction to monitoring impacts to bats in the Brazilian Amazon.

    Science.gov (United States)

    Bobrowiec, Paulo Estefano D; Tavares, Valéria da Cunha

    2017-01-01

    The modification of Amazonian rivers by the construction of megaprojects of hydroelectric dams has widely increased over the last decade. Robust monitoring programs have been rarely conducted prior to the establishment of dams to measure to what extent the fauna, and its associated habitats may be affected by upcoming impacts. Using bats as models, we performed analyses throughout the area under the influence of the Santo Antônio hydroelectric dam, Southwestern Brazilian Amazonia before its construction to estimate how the fauna and its associated habitats would be affected by the upcoming impacts. We surveyed bats in 49 plots distributed along the areas going to be inundated by the dam and those remaining dry. As predictors for the species distribution, we tested the variables of vegetation structure and topography. Species composition largely differed between the dry plots and the plots located in areas that will be flooded, and this was strongly associated with the variables of forest basal area and elevation. Vegetation-related variables also had strong influence on the guilds distribution. The flooding of lower elevations areas is expected to negatively affect the species number and abundance of frugivorous species. In contrast, it is likely that animalivores will be less vulnerable to dam-induced flooding, since they were abundant in the areas not expect to be inundated. We urge for the implementation of studies to predict impacts caused by large hydroelectric dams, including tests of the influence of the local conditions that shape diversity to avoid massive losses of the biota, and to build preventive monitoring and management actions.

  9. Monitoring of surge tanks in hydroelectric power plants using fuzzy control; Ueberwachung von Wasserschloessern in Wasserkraftwerken mit Fuzzy-Control

    Energy Technology Data Exchange (ETDEWEB)

    Lin, J.C.

    2000-07-01

    Surge tanks are used to reduce pressure variations caused by fluid transients in high-head hydroelectric power plants. Occasionally load increases have to be limited to prevent the surge tank from draining due to excessive demands of flow. A control concept based on fuzzy logic was developed for governing the load changes of hydroelectric power plants. In order to achieve an optimal control behaviour and simultaneously to avoid the draining of surge tanks, the speed of load increases is automatically adjusted by a fuzzy conclusion depending on the height and the gradient of the water level in the surge tank, the reservoir level and the sum of load increases. The hydroelectric power plant Achensee of Tiroler Wasserkraftwerke AG in Austria is taken as an example to demonstrate the characteristics of the control concept. In comparison with a conventional control concept, the operation of load increases using the fuzzy concept proves to be more flexible and unrestricted. (orig.) [German] Ein Wasserschloss dient zur Verminderung von Druckschwankungen im Wasserfuehrungssystem von Hochdruckanlagen. Gelegentlich muss man die Lastaufnahme so beschraenken, dass das Wasserschloss nicht durch uebermaessige Wasserentnahme leerlaeuft. Fuer die Leistungsregelung eines Wasserkraftwerks wurde ein Konzept entwickelt, das auf der Fuzzy-Control in Verbindung mit der klassischen Regelung beruht. Um ein optimales Regelverhalten zu erhalten und gleichzeitig das Leerlaufen des Wasserschlosses zu vermeiden, wird die Geschwindigkeit der Lastaufnahme in Abhaengigkeit von der Hoehenkote und dem Gradienten des Wasserschlosspegels, dem Pegel des Oberwassers und der Groesse der geforderten Lasterhoehung automatisch eingestellt. Die Untersuchung erfolgt am Beispiel des Achenseekraftwerkes der Tiroler Wasserkraftwerke AG, Oesterreich. Im Vergleich mit einer konventionellen Regelung ergibt sich mit dem Fuzzy-Konzept eine flexiblere und freizuegigere Lastaufnahme. (orig.)

  10. Annual Review of BPA-Funded Anadromous Fish Projects, March 18-20, 1986, Holiday Inn Airport, Portland, Oregon.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1986-02-01

    This report contains descriptions of projects specifically related to anadromous salmonids. They include projects in the following categories: (1) fish and wildlife projects in western Montana; (2) fish health and physiology; (3) habitat enhancement and passage improvement - Oregon I; (4) passage improvement and natural propagation - Washington; (5) habitat enhancement and passage improvements - Oregon II; (6) future hydroelectric assessments; (7) habitat enhancement and passage improvement - Idaho; (8) downstream migration: flows and monitoring; (9) downstream migration: reservoir impacts; and (10) habitat evaluation and monitoring. (ACR)

  11. Development of a 1 D hydrodynamic habitat model for the Hippopotamus amphibious as basis for sustainable exploitation of hydroelectric power

    Science.gov (United States)

    Manful, D. Y.; Kaule, G.; Wieprecht, S.; Rees, J.; Hu, W.

    2009-12-01

    Hydroelectric Power (HEP) is proving to be a good alternative to carbon based energy. In the past hydropower especially large scale hydro attracted significant criticism as a result of its impact on the environment. A new breed of hydroelectric dam is in the offing. The aim is to have as little a footprint as possible on the environment in both pre and post construction phases and thus minimize impact on biodiversity whilst producing clean renewable energy. The Bui dam is 400 MW scheme currently under development on the Black Volta River in the Bui national park in Ghana. The reservoir created by the Bui barrage is expected to impact (through inundation) the habitat of two species of hippos know to exist in the park, the Hippopotamus amphibius and the Choeropsis liberiensis. Computer-based models present a unique opportunity to assess quantitatively the impact of the new reservoir on the habitat of the target species in this case the H. amphibious. Until this undertaking, there were very few studies documenting the habitat of the H. amphibious let alone model it. The work and subsequent presentation will show the development of a habitat model for the Hippopotamus amphibius. The Habitat Information retrieval Program based on Streamflow Analysis, in short HIPStrA, is a one dimensional (1D) in-stream, spatially explicit hybrid construct that combines physico-chemical evidence and expert knowledge to forecast river habitat suitability (Hs) for the Hippopotamus amphibius. The version of the model presented is specifically developed to assess the impact of a reservoir created by a hydroelectric dam on potential dwelling areas in the Bui gorge for hippos. Accordingly, this version of HIPStrA simulates a special reservoir suitability index (Rsi), a metric that captures the”hippo friendliness” of any lake or reservoir. The impact of measured and simulated flood events as well as low flows, representing extreme events is also assessed. Recommendations are made for the

  12. Iowa Hill Pumped Storage Project Investigations - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hanson, David [Sacramento Municipal Unitlity District, Sacramento, CA (United States)

    2016-07-01

    This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

  13. Study on the technical and economical viability in the using of the spilled turbinable energy from the Itaipu Hydroelectric Power Plant for the ammonia synthesis of the nitrogen fertilizers; Estudo da viabilidade tecnica e economica do aproveitamento da energia vertida turbinavel da usina hidreletrica de Itaipu para sintese de amonia para fertilizantes nitrogenados

    Energy Technology Data Exchange (ETDEWEB)

    Espinola, Michel Osvaldo Galeano [Universidade Nacional de Assuncao (Paraguay). Faculdade de Ciencias Quimicas]. E-mail: michelosvaldo@qui.una.py

    2008-07-01

    In many hydroelectric power plants, when the inflows are greater than the demand for energy, a portion of the water that could be used to generate energy is diverted to the spillway and literally wasted. This energy, designated as 'Spilled Turbinable Energy', could be used advantageously to generate other products or an energy vector that could be stored for later use, since in these occasions the dam is full. The present work studies the feasibility of using the spilled turbinable energy of the Itaipu Hydroelectric Power Plant to produce electrolytic hydrogen that, together with the nitrogen from air, is an important feedstock for the ammonia synthesis, used to produce nitrogen fertilizers. The minimum production cost of electrolytic hydrogen was estimated in US$ 0,246/m3 or US$ 2,750/kg, for a plant with capacity of 55 mil m3/h, which correspond to 247,5 MW of electrical power deriving from 82% of spilled turbinable energy and 18% of guaranteed energy. Next to that hydrogen plant it is possible to install an ammonia plant of approximately 500 t/day, operating 350 days/year, with a production cost of approximately US$ 562,81/t. This capacity is enough to supply 38,5% of the ammonia demand estimated for the region focused in the project, 1.300 t/day. Nowadays, ammonia is commercialized in the Brazilian market by approximately US$ 525,60/t. For that reason, it can be concluded that ammonia production through the association of spilled turbinable and guaranteed energy next to Itaipu Hydroelectric Power Plant is not economically feasible by the moment, mainly due to the high cost of imported electrolysers. Nevertheless, with the installation of an ammonia plant based on water electrolysis next to Itaipu Hydroelectric Power Plant, it could be avoided an annual carbon emission of 234 thousand tons, even considering methane and carbon dioxide emissions of the Itaipu's reservoir. If such project were approved by the Clean Development Mechanism, that

  14. New social movements and political process: The politics of hydroelectric power in Switzerland

    Science.gov (United States)

    Lehmann, Luzia M.

    This dissertation analyzes the mobilization and impact of the ecology movement mobilizing against and challenging hydroelectric power plants in the Alps. It argues that the political process model is the most fruitful framework for such a study, linking a political system's structural constraints and opportunities to movement action via organizational resources. The mobilization process resulting in movement impact is conceived as an interactive process among social movements, authorities, other opponents, and potential counter movements. The case study method is then used to analyze three action campaigns launched against hydro power plants in Graubunden since the 1970s: Ilanz I and II, Greina, and Curciusa. In terms of the movement's narrow goal of preventing a plant, Ilanz I and II is a failure, Greina a success, and Curciusa ambiguous. Yet the author defines movement impact more broadly, including procedural, reactive and proactive substantive impact, and structural impact, changes in the alliance/conflict system, and social learning. Based on the evidence from the case studies, these factors affect movement outcome positively: visibility in the media and framing the debate, adjusting the target level and movement repertoire to the opportunity structure and the spatial concentration of the issue, proactivity, and organizational resources with a well developed division of labor, internal communication, and a non-partisan alliance system at all levels. There are two main conceptual contributions. First, the author analyzes the political opportunity structure at all levels of the federal polity--the national, cantonal, and communal--as well as the interplay among the levels. The fact that the cantonal and communal levels exhibit more elements of closure than the national level helps explain differences in movements' organizational resources, movement repertoire, targeting of movement action, and thus movement impact. Second, the author develops the spatial

  15. Systems for the calculation of electrical parameters and energy efficiency for high-capacity hydroelectric generators; Sistemas para el calculo de parametros electricos y eficiencia energetica para generadores hidroelectricos de gran capacidad

    Energy Technology Data Exchange (ETDEWEB)

    Reyes Martinez, Oscar Alfonso; Pascacio de los Santos, Alberth; Perez Abad, Carlos Alberto [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Leon Rivera, Nicolas [CFE-LAPEM, Irapuato, Guanajuato (Mexico)

    2012-07-01

    In recent years, the Comision Federal de Electricidad (CFE) has developed important hydroelectrical power projects in Mexico. Most of them are located in the Santiago River Hydrological System in Nayarit, Mexico. A total of 27 projects with a capacity of 4,300 MW are considered but only 32% of them have been carried out. One of the most ambitious projects that continue in process of construction is the Hydroelectrical Plant La Yesca. This project will conclude in late 2012 and consists of two electric generators of 375 MW, 17 kV. It will be second in power and the third in electrical generation at the system. According to national and international standards, a set of static and dynamic tests must be performed in these generators before commissioning, to ensure their proper operation. Winding stator high voltage endurance test, three phase sudden short circuit test and energy efficiency calculation are some of the most important tests to be performed in a new electrical generator. These tests are difficult to perform on-site due to the equipment capacity required, so very few companies in the world can conduct them. In Mexico no one has the necessary infrastructure for testing in high capacity hydroelectric generators such as those from La Yesca, so the Laboratorio de Pruebas a Equipos y Materiales (LAPEM) has invested in projects to improve this project in order to meet the needs of the Mexican electricity sector. This paper is a description of the systems developed for the calculation of electrical parameters and energy efficiency for this class of generators. [Spanish] En los ultimos anos, la Comision Federal de Electricidad (CFE) ha desarrollado importantes proyectos hidroelectricos en Mexico. La mayor parte se ubican en el Sistema Hidrologico del Rio Santiago en Nayarit, Mexico. Se consideran un total de 27 proyectos con capacidad de 4300 MW, pero solo 32 % de ellos se han llevado a cabo. Uno de los proyectos mas ambiciosos que continua en proceso de

  16. Executive summary: legal obstacles and incentives to the development of small scale hydroelectric potential in the seven mid-western states

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The relationship of Federal law and regulation to state law and regulation of small-scale hydroelectric facilities is described. Important features of the constitutional law, statutory law, case law, and regulations of each of the 7 mid-western states (Illinois, Indiana, Kentucky, Michigan, Ohio, West Virginia, and Wisconsin) are highlighted. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, i.e., the law of pre-emption, and the application of this law to the case of hydroelectric development and regulation of water resources. A state-by-state synopsis of these important provisions of the laws of the states that have a bearing on small-scale hydroelectric development is presented.

  17. Environmental costs associated to the electric generation: hydroelectric versus natural gas thermoelectric; Custos ambientais associados a geracao eletrica: hidreletricas versus termeletricas a gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Reis, Marcelo de Miranda

    2001-01-15

    This works presents the methodologies for valuation of the environmental costs resulting from the main damages of the cycles of electric energy arrange through hydroelectric and natural gas thermoelectric. Initially theoretical concepts are established, embracing: the description of the valuation methodologies, the possible ways of damages internalization in the value of the products, the environmental impacts of hydroelectric and natural gas thermoelectric in these fuel cycles, and the methodologies that can be applied for value the main damages caused by the impacts. Then case studies are developed, with application of the methodologies in the hydroelectric plants of Simplicio and Serra da Mesa, and in the thermoelectric complex composed for RioGen and RioGen Merchant plants. Finally, conclusions and recommendations for a better future application in Brazil of the valuation methodologies are presented. (author)

  18. Evaluation for turbine implementation for a micro hydroelectric power plant; Avaliacao para implantacao de uma turbina para uma microcentral hidreletrica

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Gilberto Manoel; Halmeman, Maria Cristina Rodrigues; Oliveira, Franciene Gois [Universidade Estadual Paulista (UNESP), Botucatu, SP (Brazil). Programa de Pos-graduacao em Energia na Agricultura; Seraphim, Odivaldo Jose [Universidade Estadual Paulista (UNESP), Botucatu, SP (Brazil). Dep. de Engenharia Rural

    2008-07-01

    In this work it was analyzed the viability technical and economical of turbines to micro hydroelectric headquarters as an alternative to consumers not served by electric energy in isolated areas. It was used a experimental methods to create an estimative and a evaluation of the hydroelectric potential, through hydrological criteria in the area and, thus, be able to note if there is viability for its use. Some kinds of turbines made by the national industry were verified, analyzing the technical and economical characteristics and in function of the hydro energetic-conditions of the area. The results shoed that a micro-headquarters serves the necessities and expectations of the owner at the electric energy supply. It was noted that the expenses are smaller comparing to the other expenses know in the literature, from national factories. Even though the limiting factor is the distance from the production to the consumer, the potency of 18.4 kw was enough to satisfy the local necessities. The installation of de micro headquarters will bring enhances and facilities by the fact that it represents a big social importance for the area. (author)

  19. The impacts of wind power integration on sub-daily variation in river flows downstream of hydroelectric dams.

    Science.gov (United States)

    Kern, Jordan D; Patino-Echeverri, Dalia; Characklis, Gregory W

    2014-08-19

    Due to their operational flexibility, hydroelectric dams are ideal candidates to compensate for the intermittency and unpredictability of wind energy production. However, more coordinated use of wind and hydropower resources may exacerbate the impacts dams have on downstream environmental flows, that is, the timing and magnitude of water flows needed to sustain river ecosystems. In this paper, we examine the effects of increased (i.e., 5%, 15%, and 25%) wind market penetration on prices for electricity and reserves, and assess the potential for altered price dynamics to disrupt reservoir release schedules at a hydroelectric dam and cause more variable and unpredictable hourly flow patterns (measured in terms of the Richards-Baker Flashiness (RBF) index). Results show that the greatest potential for wind energy to impact downstream flows occurs at high (∼25%) wind market penetration, when the dam sells more reserves in order to exploit spikes in real-time electricity prices caused by negative wind forecast errors. Nonetheless, compared to the initial impacts of dam construction (and the dam's subsequent operation as a peaking resource under baseline conditions) the marginal effects of any increased wind market penetration on downstream flows are found to be relatively minor.

  20. A Computed River Flow-Based Turbine Controller on a Programmable Logic Controller for Run-Off River Hydroelectric Systems

    Directory of Open Access Journals (Sweden)

    Razali Jidin

    2017-10-01

    Full Text Available The main feature of a run-off river hydroelectric system is a small size intake pond that overspills when river flow is more than turbines’ intake. As river flow fluctuates, a large proportion of the potential energy is wasted due to the spillages which can occur when turbines are operated manually. Manual operation is often adopted due to unreliability of water level-based controllers at many remote and unmanned run-off river hydropower plants. In order to overcome these issues, this paper proposes a novel method by developing a controller that derives turbine output set points from computed mass flow rate of rivers that feed the hydroelectric system. The computed flow is derived by summation of pond volume difference with numerical integration of both turbine discharge flows and spillages. This approach of estimating river flow allows the use of existing sensors rather than requiring the installation of new ones. All computations, including the numerical integration, have been realized as ladder logics on a programmable logic controller. The implemented controller manages the dynamic changes in the flow rate of the river better than the old point-level based controller, with the aid of a newly installed water level sensor. The computed mass flow rate of the river also allows the controller to straightforwardly determine the number of turbines to be in service with considerations of turbine efficiencies and auxiliary power conservation.

  1. Further tests of changes in fish escape behavior resulting from sublethal stresses associated with hydroelectric turbine passage

    Energy Technology Data Exchange (ETDEWEB)

    Ryon, Michael G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Cada, Glenn F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Smith, John G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2004-04-01

    Fish that pass through a hydroelectric turbine may not be killed directly, but may nonetheless experience sublethal stresses that will increase their susceptibility to predators (indirect mortality). There is a need to develop reliable tests for indirect mortality so that the full consequences of passage through turbines (and other routes around a hydroelectric dam) can be assessed. The most commonly used laboratory technique for assessing susceptibility to predation is the predator preference test. This report evaluates the field application of a new technique that may be valuable for assessing indirect mortality, based on changes in a behavioral response to a startling stimulus (akin to perceiving an approaching predator). The study compared the behaviors of 70 fish passed through the turbine and another 70 under control conditions (either transferred from the holding tank or injected into the Alden loop downstream of turbine). The resulting image files were analyzed for a variety of behavioral measures including: presence of a startle response, time to first reaction, duration of reaction, time to formation of the maximum C-shape, time to completion of the C-shape, completeness of the C-shape, direction of turn, and degree of turn. The data were evaluated for statistical significance and patterns of response were identified.

  2. Report on the development perspectives of the hydroelectric production in France; Rapport sur les perspectives de developpement de la production hydroelectrique en France

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-03-15

    This report, presented to the Ministry of the Economy, the Finances and the Industry, has been realized by the high ranking of the sustainable development of the Ministry. It presents the synthesis of the working group study at the second half year 2005 and proposes to the Ministry some practical actions to develop the hydroelectric production in France. After a presentation of the hydro electric-power challenges and potential, the author discusses the regulatory context of the hydroelectric power development, the conditions of this development and proposes some actions. (A.L.B.)

  3. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2001-09-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such

  4. Model for analysis and definition of the governor constants in hydroelectric power; Modelo para analise e definicao das constantes do regulador em usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, Jose Geraldo Pena de; Koelle, Edmundo; Luvizotto Junior, Edevar [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Civil. Dept. de Hidraulica e Saneamento

    1997-07-01

    This paper presents a complete mathematical and computer model which allows simulating a generic hydroelectric power plant under steady state and transitory regimes, in the extensive time, and also the analysis of the oscillating flows resulting from excitation sources present in the installation, such as vortices in the suction pipe during partial load operation.

  5. Rescue and preservation of Serra da Mesa hydroelectric power plant flora; Salvamento e conservacao da flora de UHE Serra da Mesa

    Energy Technology Data Exchange (ETDEWEB)

    Santos, H.G.P.; Silva, S.P.C. da [FURNAS, Rio de Janeiro, RJ (Brazil); Walter, B.M.T. [Empresa Brasileira de Pesquisa Agropecuaria, (Brazil). CENARGEN

    1993-12-31

    This report shows what is being doing to rescue and preserve the flora affected by the construction of the Serra da Mesa hydroelectric power plant. A survey concerning the existent flora on the area influenced by the undertaking is proceeded and the first results of such survey are here presented 5 refs., 2 tabs.

  6. Matrix of risk and premium for the developing of small hydropower projects; Matriz de risco e premio para o desenvolvimento de projetos de PCHs (Pequenas Centrais Hidroeletricas)

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Afonso Henriques Moreira; Garcia, Marco Aurelio R.A.; Cruz, Ricardo A. Passos da

    2008-07-01

    The aim of this paper is to propose a method for valuation of assets of small hydroelectric plants in different stages of maturation. To this end, we adopted the principle of risk premium, associated with a portion of the profitability of the project (internal rate of return-IRR) in every stage of development. In other words: the more mature the project, the lower your risk and consequently lower the corresponding premium, adopting as a total prize the IRR expected to the project.

  7. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martinson, Rick D.; Kamps, Jeffrey W.; Kovalchuk, Gregory M. (Northwest and Alaska Fisheries Science Center, Environmental and Technical Services Division, Portland, OR)

    1999-03-01

    Project 84-014 has been part of the annual integrated and coordinated Columbia River Basin Smolt Monitoring Program since 1984, and currently addresses measure 5.9A.1 of the 1994 Northwest Power Planning Council's (NPPC) Fish and Wildlife Program. This report presents results from the 1998 smolt monitoring at John Day and Bonneville dams and represents the fifteenth annual report under this project.

  8. Small hydropower projects and sustainable energy development in Sri Lanka

    Energy Technology Data Exchange (ETDEWEB)

    Morimoto, R.; Munasinghe, M. [Cambridge Univ. (United Kingdom); Munasinghe Inst. for Development, Colombo (Sri Lanka); Yale Univ., New Haven, CT (United States)

    2005-07-01

    Sustainable development has evolved to encompass three major viewpoints: economic, social and environmental. Given the wide-ranging potential impacts of energy on national sustainable development, we review the linkages between these two topics. In the Sri Lanka case study presented here, the Sustainomics framework is used to assess the role of small hydroelectric power projects in sustainable energy development. Key variables represent economic, social and environmental dimensions. This analysis helps policy-makers compare and rank project alternatives more easily and effectively. The multi-dimensional analysis, which includes environmental and social variables, supplements the more conventional cost benefit analysis based on economic values alone. (Author)

  9. Recovery Act. Tapoco project. Cheoah upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tran, Paul [Alcoa Inc., Alcoa Center, PA (United States)

    2013-10-02

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  10. Efficiency in the execution of environmental standards for hydropower projects; Eficiencia na execucao das normas ambientais para empreendimentos hidreletricos

    Energy Technology Data Exchange (ETDEWEB)

    Nadaud, Gabriela Caiuby Ariani; Young, Carlos Eduardo Frickmann [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil)

    2010-07-01

    In the search for greater efficiency in meeting environmental standards related to hydropower projects, this article presents a proposal of indicators that can guide the entrepreneur. From the observation that the mere compliance with legal requirements for obtaining licenses does not minimize the risks of conflicts and their resulting expenses, this methodology of indicators is presented as a tool that allows more efficient compensation measures and consequent social-environmental cost reductions of hydroelectric projects. (author)

  11. Reliability of hydroelectric generation components, systems and units; Confiabilidad de componentes, sistemas y unidades de generacion hidroelectrica

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez Sanchez, Ramon; Torres Toledano, Gerardo; Franco Nava, Jose Manuel [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1996-12-31

    This article presents a methodology for the calculation of the reliability of components, systems and hydroelectric generating units, as well as the scope of a computational system for the evaluation of such reliability. In the case of the reliability calculation of components and systems, the computer programs is not limited to hydro stations and can be used in other type of systems. [Espanol] En este articulo se presenta una metodologia para calcular la confiabilidad de componentes, sistemas y unidades de generacion hidroelectrica, asi como el alcance de un sistema computacional para evaluar dicha confiabilidad. En el caso del calculo de confiabilidad de componentes y sistemas, el programa de computo no se limita a centrales hidroelectricas y puede utilizarse en otro tipo de sistemas.

  12. Impact of the Sainte-Marguerite 3 hydroelectric reservoir on the mercury exposure of local fish consumers

    Energy Technology Data Exchange (ETDEWEB)

    Schetagne, R.; Plante, M. [Hydro-Quebec Production, Baie-Comeau, PQ (Canada); Castonguay, D. [Castonguay Dandenault and Associes Inc., Quebec, PQ (Canada)

    2010-07-01

    This study examined fish mercury levels in a freshwater impoundment flooded as part of the Sainte-Marguerite-3 hydroelectric generating station. The study compared mercury levels obtained before the area was flooded in 1997 with mercury exposure surveys obtained in 2006. Mercury levels in the fish have increased by factors ranging from 4 to 8. Total mercury concentrations have reached 0.78 {mu}g per g in 400-mm lake whitefish and 1.85 {mu}g per g in 700-mm northern pike. Non-native fishers consumed significantly more local fish on a monthly basis after the area was flooded. Native Innu fishers consumed less fish. Average hair mercury concentrations for non-native fish consumers remained unchanged, which mercury levels in native fish consumers decreased significantly.

  13. Analysis of environmental issues related to small-scale hydroelectric development IV: fish mortality resulting from turbine passage

    Energy Technology Data Exchange (ETDEWEB)

    Turbak, S. C.; Reichle, D. R.; Shriner, C. R.

    1981-01-01

    This document presents a state-of-the-art review of literature concerning turbine-related fish mortality. The review discusses conventional and, to a lesser degree, pumped-storage (reversible) hydroelectric facilities. Much of the research on conventional facilities discussed in this report deals with studies performed in the Pacific Northwest and covers both prototype and model studies. Research conducted on Kaplan and Francis turbines during the 1950s and 1960s has been extensively reviewed and is discussed. Very little work on turbine-related fish mortality has been undertaken with newer turbine designs developed for more modern small-scale hydropower facilities; however, one study on a bulb unit (Kaplan runner) has recently been released. In discussing turbine-related fish mortality at pumped-storage facilities, much of the literature relates to the Ludington Pumped Storage Power Plant. As such, it is used as the principal facility in discussing research concerning pumped storage.

  14. Feasibility of restoring the Greggs Falls site to active service as a low-head hydroelectric facility

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, Jr., Robert W.

    1979-08-16

    A study was conducted to determine the feasibility of restoring to service the deactivated Greggs Falls hydroelectric station in Goffstown, New Hampshire. Evaluation of technical, economic, legal, institutional, and environmental factors led to the conclusion that restoration was both feasible and attractive. The site can be restored for an investment of $2.1 to $2.4 million (depending on the operational mode) to establish 1.5 MW of capacity and produce 7945 MWh of electrical energy annually. Within 3 years, operation of the site can produce energy at lower costs than the cost of fuel oil in New England and will save approximately 14,600 barrels of fuel oil annually. The economic competitiveness of the facility is expected to improve with time because of the rising price of imported oil.

  15. The effects of run-of-river hydroelectric power schemes on invertebrate community composition in temperate streams and rivers.

    Science.gov (United States)

    Bilotta, Gary S; Burnside, Niall G; Turley, Matthew D; Gray, Jeremy C; Orr, Harriet G

    2017-01-01

    Run-of-river (ROR) hydroelectric power (HEP) schemes are often presumed to be less ecologically damaging than large-scale storage HEP schemes. However, there is currently limited scientific evidence on their ecological impact. The aim of this article is to investigate the effects of ROR HEP schemes on communities of invertebrates in temperate streams and rivers, using a multi-site Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 22 systematically-selected ROR HEP schemes and 22 systematically-selected paired control sites. Five widely-used family-level invertebrate metrics (richness, evenness, LIFE, E-PSI, WHPT) were analysed using a linear mixed effects model. The analyses showed that there was a statistically significant effect (pstudy design for future invertebrate community impact studies.

  16. THE SIGNIFICANCE OF STRUCTURAL AND GEOLOGICAL RELATIONSHIP ASSESSMENT IN THE CONSTRUCTION OF THE OMBLA UNDERGROUND HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    Renato Buljan

    1997-12-01

    Full Text Available The construction design of the underground hydroelectric plant Ombla required geological and structural investigations to he carried out. Due to past earthquakes in the area permanent tectonic movements were inferred. Therefore, in the wider and adjacent surroundings of the Ombla spring it was necessary to analyze the structural fabric and the geodynamic characteristics of the area. The most active zone encountered is the front part of a thrust fault belonging to the Dinaricum regional structural unit. The compressive regime is maintained as a response to the regional stress of an approximately S-N orientation. Different displacements of various parts of the Dinaricum unit are present. Along the rim of the structural blocks, the Hum-Om-bla fault zone extends, accompanied by left transcurrent faults, Through this zone the main groundwater drainage occurs supplying the Ombla spring. In the local Ombla spring area this zone is characterized by three sub-blocks and three major faults. The most important fault for the vital facilities of the Ombla hydroelectric power plant is the Pločice fault which divides the structural sub-blocks. Along this fault zone there are four mutually connected. The lowest two arc active groundwater draining systems supplying the Ombla spring. The data on local stress implies the following deformation of sub-blocks: sub-blocks 2c and 2f are displaced along normal faults from 20° to 30° to the left, downwards, while the sub-block 2 d is displaced along the Pločice thrust fault of 100° to 130° to the left, upwards. The structural data confirmed that the building of an underground dam with a height from 100 to 130 m was feasible. The connection between the caverns and the fault zone was determined. The unfavorable position of the active Pločice fault zone imposes the construction of vital Ombla power plant facilities underground.

  17. 76 FR 46793 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-08-03

    ... Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy... Environmental Assessment (EA). The proposed project would occupy approximately 1 acre of federal land managed by the Corps. In the EA, Commission staff analyzed the potential environmental effects of licensing the...

  18. Reactivation of small hydroelectric power plant St. Marienthal Monastery, Ostritz. Final report from the 2nd part from planning to achievement; Reaktivierung der Wasserkraftanlage des Klosterstiftes St. Marienthal, Ostritz. Abschlussbericht zum zweiten Teil fuer die Bearbeitungsphasen der Projektierung bis zur Fertigstellung

    Energy Technology Data Exchange (ETDEWEB)

    Hesse, M.

    2001-07-01

    The hydroelectric power plant St. Marienthal Monastery on the river Lausitzer Neisse, which forms part of the border between Poland and Germany, was rehabilitated and modernized in the period between October 1999 and September 2000. The scheme to reactivate this plant was implemented as an external EXPO 2000 project for renewable energy production and sustainable management. On 6 October 2000, the hydroelectric power plant was officially put back into operation by Steffen Flath, Minister for the Environment and Agriculture in the German state of Saxony. The paper describes the special planning factors involved and the execution of construction work. (orig.) [German] Wiederbelebung der 1967 eingestellten Stromerzeugung bei weit hoeherer Effizienz unter Beibehaltung der oertlichen Gegebenheiten, die von den Rahmenbedingungen des Denkmalschutzes vorgegeben werden. Verzicht auf tiefe Eingriffe in den Unterlauf des Flusses, der durch Brueckentruemmer des zweiten Weltkrieges im Ablauf Stoerungen zeigt. Trotz hoeherer Wasserentnahme als bei der historischen Anlage soll die Durchgaengigkeit fuer Fische mittels einer Fischtreppe garantiert werden. Ziel ist es, das Kloster selbst und das auf seinem Territorium eingerichtete Internationale Begenungszentrum St. Marienthal vom Jahresertrag her selbst zu versorgen und ueberschuessigen Strom in das Netz der Energieversorgung Sachsen Ost AG einzuspeisen. Die Besonderheit dieser Anlage besteht darin, schon bestehende Bauwerke wieder zu nutzen, die erzeugte Energie zu demonstrieren, messen und in bei der EXPO 2000 zur energieoekologischen Modellstadt Ostritz darzustellen. (orig.)

  19. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1991 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hawkes, Lynette A.; Martinson, Rick D.; Smith, W. William (Northwest and Alaska Fisheries Science Center, Environmental and Technical Services Division, Portland, OR)

    1992-04-01

    The 1991 smolt monitoring project of the National Marine Fisheries Service provided data on the seaward migration of juvenile salmon and steelhead at John Day, The Dalles and Bonneville Dams. All pertinent fish capture and condition data as well as dam operations and river flow data were provided to Fish Passage Center for use in developing fish passage indices and migration timing, and for water budget and spill management.

  20. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1988 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Johnsen, Richard C.

    1988-12-01

    The 1988 smolt monitoring project of the National Marine Fisheries Service provided data on the seaward migration of juvenile salmon and steelhead at Lower Granite, Mcnary, John Day, and Bonneville Dams. All pertinent fish capture and condition data as well as dam operations and river flow data were provided to the FPDIS for use by FPC in developing fish passage indices and migration timing, and for water budget and spill management. 13 refs., 100 figs.

  1. Project 2010 Project Management

    CERN Document Server

    Happy, Robert

    2010-01-01

    The ideal on-the-job reference guide for project managers who use Microsoft Project 2010. This must-have guide to using Microsoft Project 2010 is written from a real project manager's perspective and is packed with information you can use on the job. The book explores using Project 2010 during phases of project management, reveals best practices, and walks you through project flow from planning through tracking to closure. This valuable book follows the processes defined in the PMBOK Guide, Fourth Edition , and also provides exam prep for Microsoft's MCTS: Project 2010 certification.: Explains

  2. Estimation of small-scale hydroelectric power plant costs; Estimacao de custos de PCH

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Afonso Henriques Moreira [MS Consultoria Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Silva, Benedito Claudio da [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Magalhaes, Ricardo Nogueira [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil)

    2010-07-01

    Changes in Brazilian energy scenario through last years such as increase of demand and search for clean and economically feasible renewable energy sources, has stimulated investors to small hydro power plants (SHP) sector. Such characteristics together with several economic incentives, legal and regulatory mechanisms also, have helped and stimulated building of new plants of this kind and have attracted a great number of investors to this sector. Study of costs analysis and feasibility of investments is a study which has been used since long time in SHP business market as several preliminary studies previous to civil project have significant costs which lead us to count with a feasibility analysis from the very beginning of studies, exactly what is suggested in the present methodology. Such feasibility analysis, in the common patterns where basic unit costs of each input remain outstanding, would be very complex due to great difficulty in obtaining information at initial phase of project. In this direction this study brings a contribution for investors as well as for designers of small hydro power plants since it outlines a link between physical and energetic characteristics of small hydro power plant in its total cost. Such link is based in available physical characteristics in initial phase of the project, making possible a previous comparison between arrangements of a central or even the comparison of return of investment between different plants. The resulting benefit being the possibility of choosing centrals with greater economic feasibility disregarding bad undertakings or arrangements with more expressive cost. Final result gives a better delay in return of investment, helps in power, arrangements more optimized and in saving time as well, reducing costs of undertakings. Due to large number of SHP arrangements, we chose for this study the most common in Brazil, plant of medium and large fall, shunting line balance chimney and low pressure conduit. (author)

  3. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martinson, Rick D.; Ballinger, Dean; Kovalchuk, Gregory M. (Pacific States Marine Fisheries Commission, Gladstone, OR)

    2002-02-01

    The seaward migration of juvenile salmonids was monitored by the Pacific States Marine Fisheries Commission (PSMFC) at John Day Dam, located at river mile 216, and at Bonneville Dam, located at river mile 145 on the Columbia River (Figure 1). The PSMFC Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council's Fish and Wildlife Program and is funded by the Bonneville Power Administration.

  4. Application of fuzzy logic in mapping the environmental impacts of hydroelectric power plants; Aplicacao da logica difusa no mapeamento de impactos ambientais em usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Melo, M.N.; Lambert-Torres, G.; Silva, L.E. Borges da [Universidade Federal de Itajuba (UNIFEI), MG (Brazil)], Emails: germanoltorres@gmail.com, leborges@unifei.edu.br; Rissino, S.; Silva, M.F. da [Universidade Federal de Rondonia (UFRO), Porto Velho, RO (Brazil)], e-mails: srissino@gmail.com, felipe@unir.br

    2009-07-01

    During the stages prior to installation of a large enterprise, there is an obligation to obtain an environmental license for its effectiveness. However, defining the relevance of an environmental impact generated by changes elapsed in a region, is something subjective, since some variables present qualitative definitions. Aiming to interrelate the variables that influence the environmental impacts in hydroelectric plants, was made the mapping of terms natural resources and degradation of the environment, and its defining variables, based on the theory of fuzzy logic. The construction of fuzzy propositions was based on the manipulation of a rule base, with the 'if' antecedent 'then' consequent structure. It was concluded that the use of fuzzy propositions for the study of environmental impact is an effective method to map the environmental impact caused by construction of a hydroelectric plant, because it defines the degree of influence of impact on the environment.

  5. Determining favourable and unfavourable areas of operation for small-scale hydroelectric plant; Ermittlung von Gunst- und Ungunstbereichen fuer die Kleinwasserkraftnutzung

    Energy Technology Data Exchange (ETDEWEB)

    Volkmann, J. [GHG, Gesellschaft fuer Hydrologie und Geowissenschaften GbR, Buchenbach (Germany)

    1998-10-01

    Decision-makers considering small-scale hydroelectric power plant face a conflict between promoting renewable forms of energy which contribute to the reduction of carbon dioxide emissions on the one hand and conserving aquatic ecosystems on the other. The approach presented here overlays and splits linear and spatial criteria to identify `taboo` or unfavourable areas, restricted areas and areas favourable for small hydroelectric plant. This can be used to reach a consensus between various interest groups. (orig.) [Deutsch] Der Zielkonflikt zwischen Foerderung regenerativer Energien als Beitrag zur CO{sub 2}-Reduzierung einerseits und wirksamem Fliessgewaesserschutz andererseits erfordert grossraeumige Rahmenkonzepte als Basis fuer Einzelentscheidungen fuer oder gegen Kleinwasserkraftnutzung. Der hier vorgestellte Ansatz ermoeglicht mittels Ueberlagerung linearer und flaechenhafter Kriterien die Ermittlung von Gunst- und Ungunstbereichen fuer die Wasserkraft. Auf diese Weise koennen im Konsens mit den beteiligten Interessengruppen sowohl Wasserkraft als auch Gewaesserschutz gezielt gefoerdert werden. (orig.)

  6. Proceedings on the seminar on small hydroelectric installations: Practice report and current development; Beitraege zum Seminar Kleinwasserkraft: Praxis und aktuelle Entwicklung

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This seminar on small hydroelectric installations informs on aspects of construction and administrative aspects. But above all, questions of machinery are dealt with. The book gives an overview of turbine types, topical recent developments in the sector of small hydroelectric power stations, and modern opportunities for fast and inexpensive design of power station components. Beyond the discussion of technical issues, the seminar wants to further contacts between science, turbine manufacturers, consultants and plant operators. (orig.) [Deutsch] Das Seminar Kleinwasserkraft gibt eine Uebersicht ueber bauliche Gestaltung und behoerdliche Aspekte. Vorallem behandelt es aber maschinenbauliche Problemstellungen. Es zeigt einen Ueberblick ueber Turbinentypen, aktuelle Neuentwicklungen im Kleinwassersektor, sowie moderne Moeglichkeiten zum schnellen und preiswerten Design von Kraftwerkskomponenten. Neben dem technischen Teil dient das Seminar auch der Foerderung des Kontakts zwischen Wissenschaft, Turbinenherstellern, Consultants und Anlagenbetreibern. (orig.)

  7. Legal obstacles and incentives to the third development of small-scale hydroelectric potential in the six New England states: executive summary

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    This executive summary describes the relationship of Federal law and regulation to state law and regulation of small-scale hydroelectric facilities. It also highlights important features of the constitutional law, statutory law, case law, and regulations of each of the six New England states. The summary may serve as a concise overview of and introduction to the detailed reports prepared by the Energy Law Institute on the legal and regulatory systems of each of the six states. The dual regulatory system is a function of the federalist nature of our government. This dual system is examined from the standpoint of the appropriate legal doctrine, i.e., the law of pre-emption, and the application of this law to the case of hydroelectric development. The regulation of small dams are discussed and flow diagrams of the regulations are presented for each of the six states - Maine, Massachusetts, Vermont, New Hampshire, Vermont, and Connecticut.

  8. The stakes of the hydroelectric power in the integrated management of the Basins. Which place for the EPTB; Les enjeux de l'hydroelectricite dans la gestion integree des bassins versants. Quelle place pour les EPTB

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-12-01

    In the framework of a sustainable development, the EPTB (Public, Territorial Institutions of Basins) need an evolution of the regulations concerning the management of the hydroelectric power (areas of the Adour, Dordogne, Garonne and Lot). This document presents in two parts the context and the stakes of the hydroelectric concession: the concessions specifications and the analysis of the main articles, the tariffs, taxes and the environment constraints. (A.L.B.)

  9. The hydroelectric dam impacts on the Kompienga river basin (Burkina Faso); Les impacts du barrage hydro-electrique sur le bassin versant de la komoienga (Burkina Faso)

    Energy Technology Data Exchange (ETDEWEB)

    Dipama, J.M.

    1997-07-01

    This study takes stock on the physical and social environment negative impacts of the hydroelectric dam built in 1985 in the Burkina Faso. Th electric power of the country have been improved but the hydrocarbons consumption did not decrease. The vegetation decreased in the area of the dam from 15 km{sup 2} to 7,6 and soils are now more exposed to the erosion phenomena. Biological modifications of the ecosystem appeared as human diseases. (A.L.B.)

  10. Feasibility determination of hydroelectric power development at the existing Sewall's Falls Dam and power facilities for the New Hampshire Water Resources Board

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    The feasibility of restoring the hydroelectric power generating capacity of the Sewall's Falls facility near Concord, NH was evaluated considering technical, economic, safety and environmental factors. It was concluded that electric power can be generated at the proposed facility at a cost of $0.025 to $0.029 per kWh, and that the construction and operation of the facility is feasible. (LCL)

  11. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martinson, Rick D.; Ballinger, Dean; Kamps, Jeffrey W. (Pacific States Marine Fisheries Commission, Gladstone, OR)

    2003-02-01

    The seaward migration of juvenile salmonids was monitored by the Pacific States Marine Fisheries Commission (PSMFC) at John Day Dam, located at river mile 216, and at Bonneville Dam, located at river mile 145 on the Columbia River. The PSMFC Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council's Fish and Wildlife Program and is funded by the Bonneville Power Administration. The purpose of the SMP is to monitor the timing and magnitude of the juvenile salmonid out-migration in the Columbia Basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time and survival estimates and to build a time series data set for future reference. The purpose of the PSMFC portion of the program is to provide the FPC with species and project specific real time data from John Day and Bonneville dams.

  12. Feasibility determination of low-head hydroelectric power development at existing sites. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Polonsky, R.

    1979-01-01

    This report contains the feasibility study, economic analysis, and information relevant to reactivation of the dam in Bethelehem, NH. It outlines a plan of development which calls for sale of the power to a local utility for the first few years of the project and then predominately on-site use of the power in an innovative plan for controlled-environment agriculture. The economic analyses indicate that reactivation of the dam would be a successful venture based on the present market value of 4.5 cents/kWh. The success of the second phase in the dam's use rests on the increasing financial attractiveness of locally grown produce in a state that currently imports over 90% of its food and is experiencing the spiraling costs of food, energy, and inflation. The best-suited turbine package for the site is an Ossberger 750-kW unit which would provide 4,014,000 kWh per year with a plant factor of 61%. The total capital costs of the project are $827,935.

  13. Downstream environmental impacts of dams: case study Tucurui Hydroelectric Plant, PA; Impactos ambientais a jusante de hidreletricas: o caso da usina de Tucurui, PA

    Energy Technology Data Exchange (ETDEWEB)

    Manyari, Waleska Valenca

    2007-12-15

    The hydroelectric resources of the Amazon region are considered a competitive alternative despite the structural problems they entail. Concerning the latter, plans to build large-scale dams in the region have drawn criticism mainly on account of the loss of forest cover in areas flooded by dam reservoirs and the conflicts concerning the relocation of indigenous and riverside communities in the region. This study seeks to contribute to better understanding of the environmental issue in the Amazon by focusing attention on the downstream effects of dams, which have large-scale, hitherto neglected ecological repercussions. The impact of dams extends well beyond the area surrounding the artificial lakes they create, harming rich Amazon wetland ecosystems. The morphology of dammed rivers changes in response to new inputs of energy and matter, which may in turn destroy certain biotypes. This is a remote-sensing-based case study of the Tucurui hydroelectric scheme in the Amazon state of Para. Attention is drawn to the need to take into account effects on alluvial rivers downstream from hydroelectric power plants when it comes to making planning decisions, as part of a sustainable energy policy. (author)

  14. Persevering pays off in Texas restoration project

    Energy Technology Data Exchange (ETDEWEB)

    Kucera, S.

    1993-06-01

    In 1984, all John McNeill wanted was to build a new ice manufacturing plant to expand his Victoria, Texas, ice business. At the time, an abandoned hydroelectric plant near Cuero, Texas, on the Guadalupe River east of San Antonio, seemed an inexpensive way to get his two most costly ingredients: energy and water. He could take water from the river, generate 175 to 200 kilowatt-hours of electricity for his own use, and sell the excess power. The 1.2-MW plant McNeill found had stood idle and in disrepair since 1965 when the owner, Central Power and Light, shut it down after a flood. McNeill bought the plant from the current owners, brothers Ralph and Raleigh Coppedge. The brothers financed McNeill's purchase. He began work on the project, but repeated periods of high water and financial difficulty inhibited progress. Five years later, McNeill teamed with Jimmy Parker, another Texan with an interest and experience in restoring old hydro plants. Together, they formed Cuero Hydroelectric, Inc. During the next four years, they faced floods and solved existing structural problems. They disassembled and repaired the turbines and governors and designed control systems using state-of-the-art technology. Finally, with financial and moral support received from family and friends, they succeeded in bringing the Cuero hydro plant into operation in the winter of 1993.

  15. Geração hidrelétrica, termelétrica e nuclear Hydroelectric, thermal and nuclear generation

    Directory of Open Access Journals (Sweden)

    Luiz Pinguelli Rosa

    2007-04-01

    Full Text Available O artigo apresenta a situação da produção de energia elétrica no Brasil e expõe os problemas para a implementação de um novo modelo no setor energético e para a inclusão de termelétricas em um grande sistema hidrelétrico. Questões ambientais são consideradas, particularmente as emissões de gás de efeito estufa. Atenta ainda para a possível construção de novos reatores nucleares no Brasil e destaca a importância da conservação energética e do uso de fontes de energia renovável.The situation of electric energy generation in Brazil is presented here, showing the problems in the implementation of the new model for the Power Sector, as well as in the inclusion of thermal plants in a very big hydroelectric system. Environment issues are considered, in particular the greenhouse gas emissions. The article pays attention to the possible construction of new nuclear reactors in Brazil. It is pointed out the importance of energy conservation and of using renewable energy sources.

  16. Assessment of power step performances of variable speed pump-turbine unit by means of hydro-electrical system simulation

    Science.gov (United States)

    Béguin, A.; Nicolet, C.; Hell, J.; Moreira, C.

    2017-04-01

    The paper explores the improvement in ancillary services that variable speed technologies can provide for the case of an existing pumped storage power plant of 2x210 MVA which conversion from fixed speed to variable speed is investigated with a focus on the power step performances of the units. First two motor-generator variable speed technologies are introduced, namely the Doubly Fed Induction Machine (DFIM) and the Full Scale Frequency Converter (FSFC). Then a detailed numerical simulation model of the investigated power plant used to simulate power steps response and comprising the waterways, the pump-turbine unit, the motor-generator, the grid connection and the control systems is presented. Hydroelectric system time domain simulations are performed in order to determine the shortest response time achievable, taking into account the constraints from the maximum penstock pressure and from the rotational speed limits. It is shown that the maximum instantaneous power step response up and down depends on the hydro-mechanical characteristics of the pump-turbine unit and of the motor-generator speed limits. As a results, for the investigated test case, the FSFC solution offer the best power step response performances.

  17. Assessment of Heavy Metals in Water, Sediment, and Fishes of a Large Tropical Hydroelectric Dam in Sarawak, Malaysia

    Directory of Open Access Journals (Sweden)

    Siong Fong Sim

    2016-01-01

    Full Text Available Bakun Hydroelectric Dam in Sarawak is one of the world highest concrete rock filled dams. This paper reports the heavy metals concentrations in water, sediment, and fishes of Bakun Dam. Water and sediment samples were collected from 11 stations and 6 fish species were caught. The samples were digested with open acid digestion and the metals contents were analysed using an atomic absorption spectrophotometer and mercury analyser. The method was validated based on certified reference materials. A higher concentration of Fe and Mn was detected in downstream water with significant longitudinal variation. Cu, Zn, and Hg were present in trace amount. All elements analysed were consistently found in sediment with no risk of contamination. For fish, Hemibagrus planiceps was characterised by higher affinity for Hg accumulation. The concentrations detected in all fish species were within the permissible guideline of 0.5 mg/kg. The health risk assessment suggested that Barbonymus schwanenfeldii, Puntioplites waandersii, Cyclocheilichthys apogon, and Hemibagrus planiceps were characterised by hazard index > 1 implying possible adverse effects. The amount of fish recommended for adults and children was in the range of 500–775 g/week and 33–135 g/week, respectively.

  18. Analysis of legal obstacles and incentives to the development of low-head hydroelectric power in Maine

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maine is discussed. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined. The first step any developer of small-scale hydropower must take is to acquire right, title, or interest in the real property. In Maine, that step requires acquisition in some form of both river banks, the river bed, and where necessary, the land needed for the upstream impoundment area. The developer must acquire the river banks to be considered a riparian owner. Classification as a riparian is important, for only a use of water by a riparian owner is deemed a reasonable use and hence a legal use. A non-riparian could not draw water from a stream to increase the water level of an impoundment area on another stream. Apart from the usual methods of land acquisition involving sale, lease, or perhaps gift, Maine has two somewhat unique methods a developer may use for property acquisition. These methods, authorized by statute, are use of the abandoned dams law and use of the Mill Dam Act for flowage of upstream impoundment areas.

  19. Brazil's Samuel Dam: lessons for hydroelectric development policy and the environment in Amazonia.

    Science.gov (United States)

    Fearnside, Philip M

    2005-01-01

    Brazil's Samuel Dam, which formed a 540-km2 reservoir in the state of Rondônia in 1988, provides lessons for development decisions throughout Amazonia and in other tropical areas. The decision to build the dam was heavily influenced by its role in the political strategies of key decision makers. Samuel illustrates both impacts and benefits of electricity supply and the dilemmas facing decision makers regarding the various options for planned electricity generation. Environmental costs included flooding forest and stimulating illegal logging activity throughout western Amazonia because of an exception opened for Samuel in Brazil's prohibition of export of raw logs. Samuel emitted substantially more greenhouse gases than would have been emitted by generating the same amount of electricity from oil. Contamination of fish in the reservoir resulted from methylation of mercury present in the soil. Social costs of the dam included resettlement of 238 families of farmers; impacts on indigenous people were indirect. Mitigating measures included faunal rescue and creation of a forest reserve. The lessons of Samuel include the need to consider a full range of alternatives prior to making decisions in practice and the importance of adhering to the logical sequence of decision making, where information is gathered and compared prior to the decision. It also shows the need to maintain flexibility when the costs and benefits of different alternatives change significantly over the course of the project's planning and execution, as occurred at Samuel.

  20. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1992 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hawkes, Lynnette A.; Martinson, Rick D.; Absolon, Randall F. (Northwest and Alaska Fisheries Science Center, Environmental and Technical Services Division, Portland, OR)

    1993-05-01

    The seaward migration of salmonid smolts was monitored by the National marine Fisheries Service (NMFS) at two sites on the Columbia River in 1992. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program to index Columbia Basin juvenile salmonied stocks. It is coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Agencies and Tribes. Its purpose is to facilitate fish passage through reservoirs and at dams by providing FPC with timely smolt migration data used for flow and spill management. Data is also used for travel time, migration timing and relative run size magnitude analysis. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration (BPA). Sampling sites were John Day and Bonneville Dams under the 1992 Smolt Monitoring Program. All pertinent fish capture, condition, brand recovery, and flow data, were reported daily to FPC. These data were incorporated into the FPC`s Fish Passage Data System (FPDS).

  1. VARIANT OF THE CONSTRUCTION OF KATUN (ALTAI HYDROELECTRIC COMPLEX WITH COMBINED DAM

    Directory of Open Access Journals (Sweden)

    Sainov Mikhail Petrovich

    2016-06-01

    Full Text Available The authors give the description of an alternative construction variant of high-head Katun HPP where a reinforced-concrete faced rockfill dam will be the main water retaining structure. At the present moment it is doubtful that at the particular site a high-head complex will be constructed; the discussions are related only to the possibility of a medium-head project construction (to be called Altai HPP. Therefore, it is necessary to design Altai HPP in such a way that its concrete spillway dam will be further able to become a part of a high-head embankment dam. Therefore, we considered the alternative, where Katun HPP dam would be a combined dam by its structure; a high-head em-bankment dam will rest on a less high concrete dam. All the structures were designed for this variant as well as river diversion scheme and the diversion layout at all construction stages were developed. For this purpose “drops in wells” are proposed to be used. The combined dam structure was validated by the stress-strain state analysis under static and seismic loads. In order to improve shear strength of the concrete part of the dam it was proposed to arrange an upstream apron for decreasing seepage uplift.

  2. The design of Sri Lanka's Samanalawewa project

    Energy Technology Data Exchange (ETDEWEB)

    Back, P.A.A.; Westwell, J.R. (Sir Alexander Gibb and Partners, Reading (GB))

    1988-06-01

    Sri Lanka has both a climate and topography favourable to hydroelectricity. The largest river in the country is the Mahaweli Ganga, of which almost all the potential has now been exploited by the Kotmale, Victora, Randenigala and Rantembe (under construction) schemes. The hydro development of Sri Lanka will continue with the construction of projects on other river systems, and the Samanalawewa project on the Walawe Ganga (flowing south from the Central Highlands) is one such project now under construction. This project consists of a 100 m-high embankment dam, a 5 km-long power tunnel, a steel penstock and a surface power station with two 60 MW units. At a later stage it is planned to double the size of the powerplant and tap the flow from a tributary, which passes above the power tunnel near its downstream end. (author).

  3. The Effects of Run-of-River Hydroelectric Power Schemes on Fish Community Composition in Temperate Streams and Rivers.

    Directory of Open Access Journals (Sweden)

    Gary S Bilotta

    Full Text Available The potential environmental impacts of large-scale storage hydroelectric power (HEP schemes have been well-documented in the literature. In Europe, awareness of these potential impacts and limited opportunities for politically-acceptable medium- to large-scale schemes, have caused attention to focus on smaller-scale HEP schemes, particularly run-of-river (ROR schemes, to contribute to meeting renewable energy targets. Run-of-river HEP schemes are often presumed to be less environmentally damaging than large-scale storage HEP schemes. However, there is currently a lack of peer-reviewed studies on their physical and ecological impact. The aim of this article was to investigate the effects of ROR HEP schemes on communities of fish in temperate streams and rivers, using a Before-After, Control-Impact (BACI study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 23 systematically-selected ROR HEP schemes and 23 systematically-selected paired control sites. Six area-normalised metrics of fish community composition were analysed using a linear mixed effects model (number of species, number of fish, number of Atlantic salmon-Salmo salar, number of >1 year old Atlantic salmon, number of brown trout-Salmo trutta, and number of >1 year old brown trout. The analyses showed that there was a statistically significant effect (p<0.05 of ROR HEP construction and operation on the number of species. However, no statistically significant effects were detected on the other five metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future fish community impact studies.

  4. Shoreline erosion and aeolian deposition along a recently formed hydro-electric reservoir, Blöndulón, Iceland

    Science.gov (United States)

    Vilmundardóttir, O. K.; Magnússon, B.; Gísladóttir, G.; Thorsteinsson, Th.

    2010-02-01

    Erosion and deposition processes have been active along the shores of the Blöndulón hydro-electric reservoir in the Icelandic highlands since its formation nearly two decades ago. In this study, bluff development and distribution of aeolian material along the shores of the reservoir is related to erosive forces and source materials. The 57 km 2 reservoir was formed in the glacial river Blanda in 1991 and enlarged in 1996. Bluff erosion and aeolian deposition has been monitored since 1997. Field observations, meteorological data, GIS analyses and calculations of wave power were used to measure and describe erosive processes along the new shoreline. Wave-induced bluff erosion was most rapid during the first years after impoundment and was most active at sites with glacial till substrate, high cumulative wave power, and long fetches along the dominant wind direction. In recent years, relatively high erosion rates have continued at bluffs of fluvioglacial material under low cumulative wave power. The fluvioglacial material has low resistance to wave activity, creating unstable bluffs, whereas bluffs made of glacial till are more stable. Aeolian sandy sediment, mainly volcanic tephra eroded from soils, has been deposited at sites open towards dry strong winds during low water levels in inlets of low wave energy. Slope and aspect against wind direction restricted the sediment distribution to 212 000 m 2 (21 ha) of the heathland along the reservoir. By 2008 a volume of ~ 11 000 m 3 had accumulated. The continued redistribution of aeolian sediments and processes of bluff erosion were controlled by the water level fluctuations in the reservoir.

  5. Standardizing instream flow requirements at hydropower projects in the Cascade Mountains, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Smith, I.M.; Sale, M.J.

    1993-06-01

    Instream flow requirements are common mitigation measures instituted in the bypassed reaches of hydroelectric diversion projects. Currently, there are two extremes among the ways to determine instream flow requirements: generic standard-setting methods and detailed, habitat-based, impact assessment methods such as the Instream Flow Incremental Methodology (IFIM). Data from streams in Washington state show a consistent pattern in the instream flow requirements resulting from the IFIM. This pattern can be used to refine the simpler standard-setting approaches and thereby provide better estimates of flow needs during early stages of project design.

  6. Environmental impact analysis of the hydroelectric power development sheme in the River Grunnaai in Seljord municipality, Telemark; Konsekvensutredning av kraftutbyggingsprosjekt i Grunnaai i Seljord, Telemark

    Energy Technology Data Exchange (ETDEWEB)

    Muniz, I.P.; Bendiksen, E.; Erikstad, L.; Reitan, O.

    1997-12-31

    This report discusses the possible environmental consequences of a planned hydroelectric power development of the river Grunnaai, Norway. The consequences are found to be small, provided the proper counter measures are taken. Without counter measures, there may be moderate consequences on fish populations and botanical conditions, directly dependent on the changed water flow. The greatest value of the area concerned lies in its unspoiled wilderness character. There are extensive lists of birds and mammals and plant species registered in the river valley. 51 refs., 7 figs., 4 tabs.

  7. Overhaul of the generator of the hydroelectric central station Ingeniero Carlos Ramirez Ulloa; Rehabilitacion del generador de la unidad 2 de la central hidroelectrica ingeniero Carlos Ramirez Ulloa

    Energy Technology Data Exchange (ETDEWEB)

    Robles Pimentel, Edgar [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Garcia Hernandez, Javier [Comision Federal de Electricidad, Mexico, D. F. (Mexico)

    1997-12-31

    In November 1995, the failure of the Unit 2 generator at the hydroelectric central station Ingeniero Carlos Ramirez Ulloa, El Caracol, occurred. The accident forced to carry out its overhaul. Here are presented the technical problems faced during the overhaul of the generator and analyzed the implemented solutions. [Espanol] En noviembre de 1995 ocurrio la falla del generador de la unidad 2 de la central hidroelectrica Ing. Carlos Ramirez Ulloa, El Caracol. El accidente obligo a llevar a cabo su rehabilitacion. Se presentan los problemas tecnicos enfrentados durante la rehabilitacion del generador y se discuten las soluciones implementadas.

  8. Mathematical Modeling in Systems for Operational Evaluation of the Stress-Strain State of the Arch-Gravity Dam at the Sayano-Shushenskaya Hydroelectric Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Bellendir, E. N.; Gordon, L. A., E-mail: lev-gordon@mail.ru; Khrapkov, A. A.; Skvortsova, A. E., E-mail: SkvortsovaAE@vniig.ru [B. E. Vedeneev All-Russia Research Institute of Hydraulic Engineering (VNIIG) (Russian Federation)

    2017-01-15

    Current studies of the stress-strain state of the dam at the Sayano-Shushenskaya Hydroelectric Power Plant at VNIIG based on mathematical modeling including full scale and experimental data are described. Applications and programs intended for automatic operational evaluation of the stress-strain state of the dam for optimizing control of the upper race level in the course of the annual filling-drawdown cycle and during seismic events are examined. Improvements in systems for monitoring the stress-strain state of concrete dams are proposed.

  9. Preliminary analysis of legal obstacles and incentives to the development of low-head hydroelectric power in the northeastern United States

    Energy Technology Data Exchange (ETDEWEB)

    1980-05-01

    A preliminary analysis of the legal obstacles and incentives to the development of the low-head hydroelectric potential of the 19 northeastern US (Maine, New Hampshire, Vermont, Massachusetts, Rhode Island, Connecticut, New York, New Jersey, Pennsylvania, Ohio, Indiana, Michigan, Illinois, Wisconsin, Kentucky, Maryland, Delaware, Virginia, and West Virginia) is presented. The statutes and case laws of the 19 states and the Federal government which affect developers of small dams are stressed. The legal uncertainty which confronts the developer of small dams and the regulatory burden to which the developer may be subjected once the uncertainty is resolved are emphasized.

  10. Yakima Basin Fish Passage Project, Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    Implementation of the Yakima Basin Fish Passage Project -- Phase 2 would significantly improve the production of anadromous fish in the Yakima River system. The project would provide offsite mitigation and help to compensate for lower Columbia River hydroelectric fishery losses. The Phase 2 screens would allow greater numbers of juvenile anadromous fish to survive. As a consequence, there would be higher returns of adult salmon and steelhead to the Yakima River. The proposed action would play an integral part in the overall Yakima River anadromous fish enhancement program (fish passage improvement, habitat enhancement, hatchery production increases, and harvest management). These would be environmental benefits associated with implementation of the Fish Passage and Protective Facilities Phase 2 Project. Based on the evaluation presented in this assessment, there would be no significant adverse environmental impacts if the proposed action was carried forward. No significant adverse environmental effects have been identified from construction and operation of the Yakima Phase 2 fish passage project. Proper design and implementation of the project will ensure no adverse effects will occur. Based on the information in this environmental analysis, BPA's and Reclamation's proposal to construct these facilities does not constitute a major Federal action that could significantly affect the quality of the human environment. 8 refs., 4 figs., 6 tabs.

  11. Greenhouse gas (CO2 and CH4) emissions from a high altitude hydroelectric reservoir in the tropics (Riogrande II, Colombia)

    Science.gov (United States)

    Guérin, Frédéric; Leon, Juan

    2015-04-01

    Tropical hydroelectric reservoirs are considered as very significant source of methane (CH4) and carbon dioxide (CO2), especially when flooding dense forest. We report emissions from the Rio Grande II Reservoir located at 2000 m.a.s.l. in the Colombian Andes. The dam was built at the confluence of the Rio Grande and Rio Chico in 1990. The reservoir has a surface of 12 km2, a maximum depth of 40m and a residence time of 2.5 month. Water quality (temperature, oxygen, pH, conductivity), nitrate, ammonium, dissolved and particulate organic carbon (DOC and POC), CO2 and CH4 were monitored bi-monthly during 1.5 year at 9 stations in the reservoir. Diffusive fluxes of CO2 and CH4 and CH4 ebullition were measured at 5 stations. The Rio grande II Reservoir is weakly stratified thermally with surface temperature ranging from 20 to 24°C and a constant bottom temperature of 18°C. The reservoir water column is well oxygenated at the surface and usually anoxic below 10m depth. At the stations close to the tributaries water inputs, the water column is well mixed and oxygenated from the surface to the bottom. As reported for other reservoirs located in "clear water" watersheds, the concentrations of nutrients are low (NO3-10 mmol m-2 d-1) were observed during the dry season. Close to the tributaries water inputs where the water column is well mixed, the average diffusive flux is 8 mmol m-2 d-1. CH4 ebullition was 3.5 mmol m-2 d-1 and no ebullition was observed for a water depth higher than 5m. The zone under the influence of the water inputs from tributaries represents 25% of the surface of the reservoir but contributed half of total CH4 emissions from the reservoir (29MgC month-1). Ebullition contributed only to 12% of total CH4 emissions over a year but it contributed up to 60% during the dry season. CH4 emissions from the Rio Grande Reservoir contributed 30% of the total GHG emissions (38GgCO2eq y-1). Overall, this study show that the majority of CH4 emissions from this

  12. Erosion Control and Recultivation Measures at a Headrace Channel of a Hydroelectric Power Plant using Different Combined Soil Bioengineering Techniques

    Science.gov (United States)

    Obriejetan, M.; Florineth, F.; Rauch, H. P.

    2012-04-01

    vegetation properties are studied by setting up comparative test plots at a field study site located at a headrace channel of a hydroelectric power plant. Different vegetational parameters such as basal coverage, species richness, species composition, abundance/dominance values by using a refined Braun-Blanquet cover estimation scale were collected as well as local environmental properties. Results during the first vegetation period show distinct effects of geotextiles especially on overall vegetation coverage and grasses-herbs-ratio. Geotextile supported plots show 20% higher overall coverage but lower amount of herbs after three months of vegetation growth compared to control plots without installation of auxiliary materials. Furthermore coir blankets reveal higher penetration resistance for seed leaves of herbal plants compared to coir nettings. Hence technical erosion protection products, biological components and it's combination have to be closely coordinated in order to achieve specified revegetation objectives and meet long-term functionality.

  13. The portfolio theory applied to small hydroelectric power plants; Teoria do portfolio aplicada a pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Bastos, Paulo Roberto Ferreira de Moura

    2002-07-01

    The 'Portfolio Theory' has been largely employed on stock markets, aiming to improve the relation between risk and return. This theory identifies many possible investment combinations once it's associated with the idea that increasing investment diversification can lower risk. The objective is, thus identify the portfolio that offers the most efficient diversification of capital. The reforms on the energy sector in Brazil have made investments on both generation and commercialization of electric energy easier for medium sized investors. There have been economic incentives to the exploration of wind and bio-mass energy, and to the construction of small hydro-electric power plants (in Portuguese, PCH), as well as many legal and regulatory mechanisms pursuing the maintenance of elevate rates of participation of renewable source in the production of electrical energy in Brazil. Between these options, the PCH are a specially good opportunity taking account of its minimum environment impact, low operational costs and total technologic control. The decision concerning investment options has been based on standard economic analysis like 'Net Present Value', 'Payback Time' or 'Cost/Benefit Relations'. Other techniques such as scenario and sensitivity have been incorporated and, more recently, there has been a search for other methods consider the uncertainty of happenings within the horizon of study. This dissertation will analyse six possibilities of PCH with standard techniques. Of them, the four possibilities considered viable will constitute our examples for the application of Portfolio Theory techniques. Once the active portfolio is determined, the best option is identified using the 'mean-variance efficient' developed by Markowitz, concluding that the theory can give better support to the decision-making in future enterprises on the electric sector. After considering the optimal return/risk combinations, there was

  14. The possible negative consequences of underground dam and reservoir construction and operation in coastal karst areas: an example of the hydro-electric power plant (HEPP Ombla near Dubrovnik (Croatia

    Directory of Open Access Journals (Sweden)

    T. Roje-Bonacci

    2013-08-01

    Full Text Available The Ombla Spring represents a typical abundant coastal karst spring located in the vicinity of the town of Dubrovnik (Croatia. Its outlet is at an altitude of 2.5 m above sea level (m a.s.l. and the water from it immediately flows into the Adriatic Sea. The minimum and maximum measured discharges are 3.96 m3 s−1 and 117 m3 s−1, respectively. The Trebišnjica River traverses through its catchment. The mean annual discharge, after the canalization of over 60 km of its watercourse with spray concrete (in the time span 1981–2011, is 24.05 m3 s−1. Before massive civil engineering work which took place during 1968–1980, the mean annual discharge was 28.35 m3 s−1. There is a project for construction of the hydro-electric power plant (HEPP Ombla, which will exclusively use groundwater from the Ombla Spring karst aquifer. The underground dam will be constructed about 200 m behind the existing karst spring outflow in the karst massif, by injecting a grout curtain. The top of the grout curtain is planned to be at an altitude of 130 m a.s.l. This karst system is complex, sensitive, vulnerable and ecologically extremely valuable. The grout curtain, as well as the HEPP Ombla development, could lead to extremely dangerous technical and environmental consequences. In this paper some probable, negative consequences of the HEPP Ombla construction and development are explained. The HEPP Ombla could result in many large and hard-to-predict negative consequences which are specific for this particular HEPP, for example (1 severe spring discharge change; (2 unpredictable regional groundwater redistribution; (3 threatening of endemic fauna; (4 induced seismicity; (5 induced sinkholes; (6 occurrence of landslides; (7 conflict regarding internationally shared karst aquifers; (8 intensification of karst flash floods; (9 sea water intrusion in coastal karst aquifer; etc.

  15. The possible negative consequences of underground dam and reservoir construction and operation in coastal karst areas: an example of the hydro-electric power plant (HEPP) Ombla near Dubrovnik (Croatia)

    Science.gov (United States)

    Roje-Bonacci, T.; Bonacci, O.

    2013-08-01

    The Ombla Spring represents a typical abundant coastal karst spring located in the vicinity of the town of Dubrovnik (Croatia). Its outlet is at an altitude of 2.5 m above sea level (m a.s.l.) and the water from it immediately flows into the Adriatic Sea. The minimum and maximum measured discharges are 3.96 m3 s-1 and 117 m3 s-1, respectively. The Trebišnjica River traverses through its catchment. The mean annual discharge, after the canalization of over 60 km of its watercourse with spray concrete (in the time span 1981-2011), is 24.05 m3 s-1. Before massive civil engineering work which took place during 1968-1980, the mean annual discharge was 28.35 m3 s-1. There is a project for construction of the hydro-electric power plant (HEPP) Ombla, which will exclusively use groundwater from the Ombla Spring karst aquifer. The underground dam will be constructed about 200 m behind the existing karst spring outflow in the karst massif, by injecting a grout curtain. The top of the grout curtain is planned to be at an altitude of 130 m a.s.l. This karst system is complex, sensitive, vulnerable and ecologically extremely valuable. The grout curtain, as well as the HEPP Ombla development, could lead to extremely dangerous technical and environmental consequences. In this paper some probable, negative consequences of the HEPP Ombla construction and development are explained. The HEPP Ombla could result in many large and hard-to-predict negative consequences which are specific for this particular HEPP, for example (1) severe spring discharge change; (2) unpredictable regional groundwater redistribution; (3) threatening of endemic fauna; (4) induced seismicity; (5) induced sinkholes; (6) occurrence of landslides; (7) conflict regarding internationally shared karst aquifers; (8) intensification of karst flash floods; (9) sea water intrusion in coastal karst aquifer; etc.

  16. Evaluation of the environmental licensing process for small hydroelectric power plants in Minas Gerais state, Brazil; Avaliacao do processo de licenciamento ambiental para pequenas centrais hidreletricas no estado de Minas Gerais

    Energy Technology Data Exchange (ETDEWEB)

    Pedreira, Adriana Coli

    2004-07-01

    The present situation of the environmental licensing process have been slow and complicated, in relation to the current conception of the sustainable environmental development in the country. The enterprises and impacting activities are being discussed and analysed through a great number of environmental laws and specific laws to each enterprise. These laws along with the inexperience of the enterprises and of the many institutions involved in the process are an obstacle to the development. This document presents the legal and institutional aspects of the environmental licensing for the implementation of small hydroelectric power plants. Laws and doctrine related to the topic were researched and concluded for Minas Gerais State with the help of a survey with the enterprises and institutions involved in the process to find out the difficulties that influence the delay of the analysis of the SHPP. The results show that the main barriers are the non-application of the CONAMA resolution 279/2001 to the SHPP, undetermined inspection criteria, excess of environmental programs, technical incapacity, lack of financial resources, non-integration of the institutional organs, the building of SHPP in permanent preservation area, project interfering in the fish fauna, studies an environmental impact with then reports and public audiences. Finally, concludes that the difficulties are based on the non-integration of the institutions and also, being recent, on the inexperience of the actors involved. Therefore, the study suggests on increase of the technical body in the institutions and training of their analysts; hiring of specialized consultancy, implantation of an environmental integrated system, social communication program in the planning phase, fulfillment of the CONAMA resolution 279/2001; integration of public ministry representatives in the licensing organs; application of planning and zoning, deadlines and legal imposition of these deadlines in order to supply the

  17. VT Potential Hydroelectric Sites

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The Renewable Energy Atlas of Vermont and this dataset were created to assist town energy committees, the Clean Energy Development Fund and other...

  18. VT Existing Hydroelectric Sites

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The Renewable Energy Atlas of Vermont and this dataset were created to assist town energy committees, the Clean Energy Development Fund and other...

  19. Further Tests of Changes in Fish Escape Behavior Resulting from Sublethal Stresses Associated with Hydroelectric Turbine Passage

    Energy Technology Data Exchange (ETDEWEB)

    Ryon, M.G.

    2004-10-20

    Fish that pass through a hydroelectric turbine may not be killed directly, but may nonetheless experience sublethal stresses that will increase their susceptibility to predators (indirect mortality). There is a need to develop reliable tests for indirect mortality so that the full consequences of passage through turbines (and other routes around a hydroelectric dam) can be assessed. The most commonly used laboratory technique for assessing susceptibility to predation is the predator preference test. In this report, we evaluate the field application of a new technique that may be valuable for assessing indirect mortality, based on changes in a behavioral response to a startling stimulus (akin to perceiving an approaching predator). The behavioral response is a rapid movement commonly referred to as a startle response, escape response, or C-shape, based on the characteristic body position assumed by the fish. When viewed from above, a startled fish bends into a C-shape, then springs back and swims away in a direction different from its original orientation. This predator avoidance (escape) behavior can be compromised by sublethal stresses that temporarily stun or disorient the fish. Initial studies demonstrated that turbulence created in a small laboratory tank can alter escape behavior. As a next step, we converted our laboratory design to a more portable unit, transported it to Alden Research Laboratory in Holden, Massachusetts, and used it to test fish that passed uninjured through a pilot-scale turbine runner. Rainbow trout were either passed through the turbine or exposed to handling stresses, and their behavior was subsequently evaluated. Groups of five fish were given a startle stimulus (a visual and pressure wave cue) and filmed with a high-speed (500 frames per s) video camera. The reactions of each group of fish to the startle stimulus were filmed at nominally 1-, 5-, and 15-min post-exposure. We compared the behaviors of 70 fish passed through the turbine

  20. Uncovering the Minor Contribution of Land-Cover Change in Upland Forests to the Net Carbon Footprint of a Boreal Hydroelectric Reservoir.

    Science.gov (United States)

    Dessureault, Pierre-Luc; Boucher, Jean-François; Tremblay, Pascal; Bouchard, Sylvie; Villeneuve, Claude

    2015-07-01

    Hydropower in boreal conditions is generally considered the energy source emitting the least greenhouse gas per kilowatt-hour during its life cycle. The purpose of this study was to assess the relative contribution of the land-use change on the modification of the carbon sinks and sources following the flooding of upland forested territories to create the Eastmain-1 hydroelectric reservoir in Quebec's boreal forest using Carbon Budget Model of the Canadian Forest Sector. Results suggest a carbon sink loss after 100 yr of 300,000 ± 100,000 Mg CO equivalents (COe). A wildfire sensitivity analysis revealed that the ecosystem would have acted as a carbon sink as long as carbon flux estimate resulted in emissions of 4 ± 2 g COe kWh as a contribution to the carbon footprint calculation, one-eighth what was obtained in a recent study that used less precise and less sensitive estimates. Consequently, this study significantly reduces the reported net carbon footprint of this reservoir and reveals how negligible the relative contribution of the land-use change in upland forests to the total net carbon footprint of a hydroelectric reservoir in the boreal zone can be. Copyright © by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America, Inc.

  1. Use of social communication as a tool for environmental licensing of small-scale hydroelectric power plants; Uso da comunicacao social como instrumento para o licenciamento ambiental de PCH - pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Tiago Filho, Geraldo Lucio [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Inst. de Recursos Naturais], e-mail: tiago@unifei.edu.br; Galhardo, Camila Rocha [Centro Nacional de Referencia em Pequenas Centrais Hidreletricas (CERPCH), MG (Brazil)], e-mail: pchnoticias@unifei.edu.br

    2006-07-01

    The present work intends to study the process of environmental licensing of the Small ones Central Hydroelectric (PCHs) through the rising of the legal framework of the referred process and to analyze the application of tools of social communication in the mitigation of the social impacts in the zone of influence of the enterprise. Through the analysis of the critical points in the environmental licensing of small hydroelectric uses and evaluation of communication actions taking in consideration the environmental costs for the enterprise. (author)

  2. Downstream effects of the Pelton-Round Butte hydroelectric project on bedload, transport, channel morphology, and channel-bed texture, lower Deschutes River, Oregon.

    Science.gov (United States)

    Heidi Fassnacht; Ellen M. McClure; Gordon E. Grant; Peter C. Klingeman

    2003-01-01

    Field, laboratory, and historical data provide the basis for interpreting the effects of the Pelton-Round Butte dam complex on the surface water hydrology and geomorphology of the lower Deschutes River, Oregon, USA. The river's response to upstream impoundment and flow regulation is evaluated in terms of changes in predicted bedload transport rates, channel...

  3. Project of the new measurement system for energy invoicing - Itaipu Hydroelectric Central; Proyecto del nuevo sistema de medicion de energia para facturacion de la Central Hidroelectrica de Itaipu

    Energy Technology Data Exchange (ETDEWEB)

    Montania E, Julio Cesar [Usina Hidroelectrica de Itaipu Binacional, Assuncion (Paraguay)

    2001-07-01

    Itaipu Binacional has taken a decision of executing a technological updating for the energy measurement system through the substitution of the current system by other one equipped with digital devices. The main reasons for that were the following: a) The equipment in operation were of an outdated generation b) The accuracy class of the existing equipment was of 0.5%, but the tendency for invoicing measurements was to install meters with accuracy class of 0.2% in the enterprises c) The requirements of ONS/MAE, in Brazil, which establishes the minimum requisites to be attended by invoicing measurement systems.

  4. Two essays on electricity markets: Entry into hydroelectric generation industry and the political cycle of regulated prices

    Science.gov (United States)

    Moita, Rodrigo Menon Simoes

    This dissertation is about the electricity industry and the problems that arise with the liberalization and de-regulation of the industry. Characteristics intrinsic to the electricity market create problems that can compromise an efficient functioning of this market. Each of the two chapters of this dissertation focus on a specific aspect of this industry. The first chapter analyzes entry in the hydroelectric generation industry. The operation of a generator upstream regularizes the river flow for generators located downstream on the same river, increasing the production capacity of the latter. This positive externality increases the attractiveness of the locations downstream whenever a generator decides to enter upstream. Therefore, the entry decision of a generator in a given location may affect all entry decisions in potential locations for plants located downstream. I first model the problem of generators located in cascade on the same river and show the positive effect of the externality. Second, I use a panel of data on investment decisions of hydro-generation firms to estimate an entry model that takes into account the effect of the externality generated by entry upriver. The results show a positive incentive to locate downstream from existing plants and from locations where entry is likely to occur. Location characteristics also play an important role on the entrants' decisions. The model provides estimates of the average expected market price across the different years covered by the sample and shows that it rose one year before the energy crisis of 2001, evidencing that the market anticipated the crisis. This result has important implications on the evaluation of the Brazilian market design. It shows that entry responded to a rise in expectations about excess demand in the future, contradicting the argument that the crisis was a consequence of mis-designed market institutions. The second chapter deals with the problem of the political cycle in regulated

  5. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  6. Brigham City Hydro Generation Project

    Energy Technology Data Exchange (ETDEWEB)

    Ammons, Tom B. [Energy Conservation Specialist, Port Ewen, NY (United States)

    2015-10-31

    Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and

  7. Projects Work!

    Science.gov (United States)

    Textor, Martin R.

    2005-01-01

    The great educational value of projects is emphasized by contrasting negative aspects of the life of today's children with the goals of project work. This is illustrated by a project "Shopping." It is shown what children are learning in such projects and what the advantages of project work are. Relevant topic areas, criteria for selecting a…

  8. Floristic and phytosociology in dense “terra firme” rainforest in the Belo Monte Hydroelectric Plant influence area, Pará, Brazil

    Directory of Open Access Journals (Sweden)

    DAN. Lemos

    Full Text Available Abstract The objective of the present study was to characterise the floristic and phytosociological composition on a stretch of dense “Terra Firme” rainforest located in the Belo Monte hydroelectric plant area of influence, located in the state of Pará, Brazil. All trees with DAP >10 cm situated in 75 permanent plots of 1 ha were inventoried. 27,126 individuals trees (361 ind.ha-1, distributed in 59 botanical families, comprising 481 species were observed. The families with the largest number of species were Fabaceae (94, Araceae (65 and Arecaceae (43, comprising 43.7% of total species. The species Alexa grandiflora (4.41, Cenostigma tocantinum (2.50 and Bertholletia excelsa (2.28 showed the highest importance values (IV. The ten species with greater IV are concentrated (22%. The forest community has high species richness and can be classified as diverse age trees, heterogeneous and of medium conservation condition.

  9. Integrated use of antioxidant enzymes and oxidative damage in two fish species to assess pollution in man-made hydroelectric reservoirs.

    Science.gov (United States)

    Sakuragui, M M; Paulino, M G; Pereira, C D S; Carvalho, C S; Sadauskas-Henrique, H; Fernandes, M N

    2013-07-01

    This study investigated the relationship between contaminant body burden and the oxidative stress status of the gills and livers of two wild fish species in the Furnas Hydroelectric Power Station (HPS) reservoir (Minas Gerais, Brazil). Gills and livers presented similar pathways of metals and organochlorine bioaccumulation. During June, organochlorines were associated with lipid peroxidation (LPO), indicating oxidative stress due to the inhibition of the antioxidant enzymes superoxide dismutase and glutathione peroxidase. In the most polluted areas, metal concentrations in the liver were associated with metallothionein. During December, contaminants in the gills and liver were associated with catalase activity and LPO. Aldrin/dieldrin was the contaminant most associated with oxidative damage in the livers of both species. This integrated approach shed light on the relationship between adverse biological effects and bioaccumulation of contaminants inputted by intensive agricultural practices and proved to be a suitable tool for assessing the environmental quality of man-made reservoirs. Copyright © 2013 Elsevier Ltd. All rights reserved.

  10. Preliminary analysis of legal obstacles and incentives to the development of low-head hydroelectric power in the Northeastern United States

    Energy Technology Data Exchange (ETDEWEB)

    Brown, P. W.; Buxton, A. W.

    1979-03-12

    This report presents a preliminary analysis of the legal obstacles and incentives to the development of the low-head hydroelectric potential of the nineteen states making up the northeastern quandrant of the U.S. The intended subject matters of the report are the statutes and case laws of the nineteen states and the Federal government which affect developers of small dams. The actual subject matters of this report are the legal uncertainty which confronts the developer of small dams and the regulatory burden to which the developer may be subjected once the uncertainty is resolved. The objective has been to locate and describe the laws and doctrines which directly or indirectly affect developers of small dams. The report reaches no final conclusion concerning the nature or impact of any particular law or doctrine on the developer of small dams. For ease of analysis, the mythical State of Hydrovania is described and its regulatory and legal systems analyzed.

  11. Case study analysis of the legal and institutional obstacles and incentives to the development of the hydroelectric power at the Maxwell locks and dam, Pennsylvania

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal, institutional and financial obstacles, and incentives to the development of hydroelectric power at the Maxwell locks and dam on the Monongahela River are analyzed. The study is one of five studies prepared by the Energy Law Institute pursuant to a contract with the National Conference of State Legislators. Each of the five studies views dam development by a different category of developer. These categories include a municipality, a public utility, a state, a private developer, and a cooperative. The Maxwell case study concerns potential development by Allegheny Electric Cooperative. Thus, the analysis of obstacles and incentives is focused on those factors which have particular impact on a cooperative. Subjects covered include a description of the site; developer description; the feasibility study; the economic feasibility; financing; Federal licensing by FERC; state licensing; local interest and requirements; the effect of locks and dam operation by the Army Corp of Engineers; and power marketing.

  12. Assessment Planning and Evaluation of Renewable Energy Resources: an Interactive Computer Assisted Procedure. [hydroelectricity, biomass, and windpower in the Pittsfield metropolitan region, Massachusetts

    Science.gov (United States)

    Aston, T. W.; Fabos, J. G.; Macdougall, E. B.

    1982-01-01

    Adaptation and derivation were used to develop a procedure for assessing the availability of renewable energy resources on the landscape while simultaneously accounting for the economic, legal, social, and environmental issues required. Done in a step-by-step fashion, the procedure can be used interactively at the computer terminals. Its application in determining the hydroelectricity, biomass, and windpower in a 40,000 acre study area of Western Massachusetts shows that: (1) three existing dam sites are physically capable of being retrofitted for hydropower; (2) each of three general areas has a mean annual windspeed exceeding 14 mph and is conductive to windpower; and (3) 20% of the total land area consists of prime agricultural biomass while 30% of the area is prime forest biomass land.

  13. Methodology to identify the location of shoals of fish downstream from hydroelectric power plant; Metodologia para identificar a locacao de cardumes de peixes a jusante de UHE

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, C.B.; Viana, E.M.F.; Faria, M.T.C. de [Universidade Federal de Minas Gerais, Belo Horizonte, MG (Brazil). Centro de Pesquisas Hidraulicas e Recursos Hidricos], Emails: martinez@cce.ufmg.br, ednamariafaria@ufmg.br, mtcdf@uol.com.br

    2009-07-01

    The location identification of fish shoals at the downstream of an hydroelectric power plants is a task of importance especially when one takes into account the need to identify possible locations for the deployment of fish transportation mechanism. This paper presents a methodology based on the use of reduced models, which will be operated during the biological testing, under flow and conditions similar to the field where will be included shoals of fish. These groups will be observed during a period of time under varying conditions of discharge of hydraulic turbines. At the end of this observation it can be identified preferential location areas of fish shoals that will be evaluated later in order to install transposition systems in the place.

  14. Construction and modernization of small hydroelectric installations with funding by programmes of the EU. Abstract; Neubau und Modernisierung von Kleinwasserkraftanlagen durch Foerderprogramme der E.U.. Kurzfassung

    Energy Technology Data Exchange (ETDEWEB)

    Hauck, E. [Ingenieurgesellschaft fuer Wasserbau und Bautechnik mbH, Rheinstetten (Germany)

    1997-12-31

    The report gives a brief introduction into the EU grant programmes since 1984 and explains the philosophy behind them. The current situation regarding grant opportunities for the construction and modernization of small hydroelectric installations is outlined. Hints are given with a view to grant applications. A selection of small hydro power stations supported by grants (since 1984) are described with their economic and technical features. (orig.) [Deutsch] In diesem Beitrag wird eine kurze Einfuehrung in die EU-Foerderprogramme seit 1984 und Erlaeuterungen zu der Programmphilosophie gegeben. Die derzeitige Situation bezueglich der Foerderung von Kleinwasserkraftanlagen fuer Neubauten und Modernisierungsmassnahmen wird dargestellt. Es werden Hinweise zur Stellung eines Foerderantrags beschrieben. Abschliessend erfolgt die Vorstellung einer Auswahl von gefoerderten Kleinwasserkraftanlagen (seit 1984) mit den wirtschaftlichen und technischen Besonderheiten. (orig.)

  15. Ecological improvements to hydroelectric power plants under EEG. Guidance to environmental verifiers and water rights authorities; Oekologische Verbesserungsmassnahmen an Wasserkraftanlagen gemaess EEG. Leitfaden fuer Umweltgutachter und Wasserrechtsbehoerden

    Energy Technology Data Exchange (ETDEWEB)

    Meyr, Christoph; Pfeifer, Hansjoerg [EVIT GmbH Ingenieurbuero Unternehmensberatung, Muenchen (Germany); Schnell, Johannes; Hanfland, Sebastian [Landesfischereiverband Bayern e.V., Muenchen (Germany)

    2011-11-15

    The use of hydropower as a renewable form of energy is experiencing a renaissance due to the energy transition in Bavaria. The fishery evaluate not uncritically this development, because hydroelectric plants generally normally represent a considerable intervention in water and therefore in the habitat of the fish. In this case it should be noted that just often not even the minimum requirements of ecology are fulfilled at existing plants according to the Federal Water Act. [German] Die Nutzung der Wasserkraft als regenerative Energieform erlebt aufgrund der Energiewende in Bayern derzeit eine Art Renaissance. Die Fischerei bewertet diese Entwicklung nicht unkritisch, stellen Wasserkraftanlagen in der Regel doch einen erheblichen Eingriff in Gewaesser und somit den Lebensraum der Fische dar. Dabei ist festzustellen, dass gerade an bestehenden Anlagen haeufig nicht einmal die Mindestanforderungen der Oekologie erfuellt werden, wie sie das Wasserhaushaltsgesetz vorschreibt.

  16. Urban green areas as the starting point for planning hydroelectric and urban developments: The case of the Sava River in the City of Ljubljana

    Directory of Open Access Journals (Sweden)

    Aleš Mlakar

    2008-01-01

    Full Text Available The article deals with the landscape and urbanistic layout of the Sava River space and North part of the Bežigrad stretch of Ljubljana. Focus is on methodological and content starting points for the layout preparation and development of urban green areas of the wider Sava River space, which as a connecting link and simultaneously independent spatial and functional entity represents the starting point for planning hydro-energetic and urban arrangements. The necessity of recognising and resolving real spatial planning issues, formulation of clear goals and concepts, confrontation of different spatial systems and interests, as well as the sensibility of devising alternative development scenarios are emphasised. One of the most important starting points of the proposed layout is comprehensive design of public open spaces and green areas. The urbanistic solution relies on a programmatically strong, distinct and structured Dunajska Street, which should transform into the public space of a modern urban artery, with a clear ending that simultaneously gradually adapts to the morphology akin to the surroundings and Sava River space. Because of its natural characteristics, preserved cultural landscape and good accessibility, this area has great potential for development of leisure activities. The proposed solution stems from the fact that the chain of hydro-electric plants shouldn't be seen as buildings with negative environmental effects, but also as development opportunities – the actual execution of a recreation area along the Sava River and a method for rehabilitating the degraded spaces. Comprehensive solutions along the river have been proposed as parts of the hydro-electric developments, with special attention focusing on active design of various riverbank types.

  17. 76 FR 22128 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-04-20

    ... Western's purchasing and/or marketing the power may be obtained at Western Area Power Administration, Rocky Mountain Region, Attn: Dave Neumayer, Power Marketing Manager, 5555 East Crossroads Blvd.../or marketing considerations. Interested entities are invited to submit a proposal on this project...

  18. 76 FR 22143 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-04-20

    ...'s purchasing and/or marketing the power may be obtained at Western Area Power Administration, Rocky Mountain Region, Attn: Dave Neumayer, Power Marketing Manager, 5555 East ] Crossroads Blvd., Loveland, CO... marketing considerations. Interested entities are invited to submit a proposal on this project. DATES: A...

  19. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  20. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  1. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  2. The marginalization of "small is beautiful": Micro-hydroelectricity, common property, and the politics of rural electricity provision in Thailand

    Science.gov (United States)

    Greacen, Christopher Edmund

    This study analyzes forces that constrain sustainable deployment of cost-effective renewable energy in a developing country. By many economic and social measures, community micro-hydro is a superior electrification option for remote mountainous communities in Thailand. Yet despite a 20 year government program, only 59 projects were built and of these less than half remain operating. By comparison, the national grid has extended to over 69,000 villages. Based on microeconomic, engineering, social barriers, common pool resource, and political economic theories, this study investigates first, why so few micro-hydro projects were built, and second, why so few remain operating. Drawing on historical information, site visits, interviews, surveys, and data logging, this study shows that the marginal status of micro-hydro arises from multiple linked factors spanning from village experiences to geopolitical concerns. The dominance of the parastatal rural electrification utility, the PEA, and its singular focus on grid extension are crucial in explaining why so few projects were built. Buffered from financial consequences by domestic and international subsidies, grid expansion proceeded without consideration of alternatives. High costs borne by villagers for micro-hydro discouraged village choice. PEA remains catalytic in explaining why few systems remain operating: grid expansion plans favor villages with existing loads and most villages abandon micro-hydro generators when the grid arrives. Village experiences are fundamental: most projects suffer blackouts, brownouts, and equipment failures due to poor equipment and collective over-consumption. Over-consumption is linked to mismatch between tariffs and generator technical characteristics. Opportunities to resolve problems languished as limited state support focused on building projects and immediate repairs rather than fundamentals. Despite frustrations, many remain proud of "their power plant". Interconnecting and selling

  3. Panama Canal Watershed Experiment- Agua Salud Project

    Science.gov (United States)

    Stallard, Robert F.; Ogden, Fred L.; Elsenbeer, Helmut; Hall, Jefferson S.

    2010-01-01

    The Agua Salud Project utilizes the Panama Canal’s (Canal) central role in world commerce to focus global attention on the ecosystem services provided by tropical forests. The Canal was one of the great engineering projects in the world. Completed in 1914, after almost a decade of concerted effort, its 80 km length greatly shortened the voyage between the Atlantic and Pacific Oceans. An entire class of ships, the Panamax, has been constructed to maximize the amount of cargo that can be carried in a Canal passage. In today’s parlance, the Canal is a “green” operation, powered largely by water (Table 1). The locks, three pairs on each end with a net lift of 27 meters, are gravity fed. For each ton of cargo that is transferred from ocean to ocean, about 13 tons of water (m3) are used. Lake Gatún forms much of the waterway in the Canal transect. Hydroelectricity is generated at the Gatún dam, whenever there is surplus water, and at Madden Dam (completed in 1936) when water is transferred from Lake Alhajuela to Lake Gatún. The Canal watershed is the source of drinking water for Panama City and Colon City, at either end of the Canal, and numerous towns in between.

  4. Semidiurnal and seasonal variations in methane (CH4) emissions from a subtropical hydroelectric reservoir (Nam Theun 2 Reservoir) measured by eddy covariance technique

    Science.gov (United States)

    Deshmukh, Chandrashekhar; Serça, Dominique; Tardif, Raphael; Demarty, Maud; Descloux, Stéphane; Chanudet, Vincent; Guédant, Pierre; Guérin, Frédéric

    2013-04-01

    Hydroelectric reservoirs have globally been identified as a significant source of methane (CH4) to the atmosphere, especially in the tropics. Assessing these emissions and their variations at small and large time scale represent important scientific challenges. In this context, the objectives of this work are (i) to compare different methodologies used to assess CH4 emissions. (ii) to determine the temporal variations in these emissions at different scales i.e. from daily to seasonal, and link these variations to environmental controlling factors. Measurements of CH4 emissions were made in a recently impounded (May 2008) subtropical hydroelectric reservoir, Nam Theun 2 (NT2), in Lao PDR, Asia. The sampling strategy included three different types of flux measurement techniques: floating chambers (FC), submerged funnels (SF), and the eddy covariance technique (EC). Flux measurements were carried out during four field campaigns conducted between May 2009 and June 2011. Eddy covariance system, composed by a 3D sonic anemometer coupled with a DLT-100 fast methane analyzer (Los Gatos Inc®), was deployed on a mast erected in a large surface of open water. Diffusive and bubbling fluxes were measured using respectively the FC and the SF techniques within the footprint of the EC station. Results from the four field campaigns show individual EC fluxes (30min) varying over 4 orders of magnitude (from 0.01 to 102 mmol.m-2.day-1). Individual diffusive fluxes measured by floating chambers ranged between 0.2 and 3.2 mmol.m-2.day-1. Bubbling fluxes were found to be highly sporadic, with individual daily flux values varying from 0 to 102 mmol.m-2.day-1. For all field campaigns, EC fluxes were very consistent with the sum of the two terms measured independently (diffusive fluxes + bubbling fluxes = EC fluxes), indicating that the eddy covariance system picked-up both diffusive and bubbling emissions from the reservoir, which is a very new and encouraging result for further studies

  5. Pacific Lamprey Research and Restoration Project : Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Close, David A.

    2002-11-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993; Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers, thus effecting larval recruitment in the basin. Adult pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River. In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River. To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2001.

  6. Small-scale hydro-electric scheme in Roches, Switzerland; Projet de concession. Petite centrale hydroelectrique de Roches

    Energy Technology Data Exchange (ETDEWEB)

    Hausmann, M.

    2006-07-01

    The small hydropower plant (SHPP) project 'PCH Roches' is planned to be built in Roches, a small village located in the Jura region of the canton of Bern. The goal of this undertaking is to reactivate a site with hydro potential of the river Birs on a section that was already well exploited by some ancient SHPP (since 1953 or probably even earlier). Several modifications were performed on this plant over the years; not all contributed positively on its production figures. Following a transfer of the water rights in 1987, claims became loud against the owner to perform maintenance on the river banks and to modify the weir such that a free passage for the fishes will be granted. Those issues contributed to inflate a conflict which ended in the repeal of the water rights and a total plant shut down in 2001. The new project plans to reuse the existing pen stock and to carry out some refurbishing activities to grant security and better performance. The weir and the intake structure are also redesigned such that the water storage can be somewhat raised for normal operation; a weir gate will however allow to better discharge the river in flood situations. A new turbine house will be erected at the current location where the tail water pen stock rejoins the river. Hence, the existing old turbine house will be obsolete and the upper and lower pen stock sections are to be linked with each other. Limited by the existing pen stock size, the new plant is expected to produce some 50 kW power and 362,000 kWh/year. This represents an increase in energy generation of around 200% compared with the ancient SHPP. Gross head is 5.38 m, net head 4.12 m with a turbine flow of at least 1.6 m{sup 3}/s. The expected energy sales price applicable to this project reaches about 0.17 CHF/kWh as per the current tariffs set by the grid owner. This project calls for the building of a state-of-the-art SHPP. It will avoid the total dismantling of the existing works to take place and allow

  7. Alzheimer's Project

    Medline Plus

    Full Text Available ... Momentum in Science, Part 2" (70 minutes) Be a part of something big. HBO's "THE ALZHEIMER'S PROJECT" ... vital research and services. "THE ALZHEIMER'S PROJECT" is a presentation of HBO Documentary Films and the National ...

  8. Project ethics

    CERN Document Server

    Jonasson, Haukur Ingi

    2013-01-01

    How relevant is ethics to project management? The book - which aims to demystify the field of ethics for project managers and managers in general - takes both a critical and a practical look at project management in terms of success criteria, and ethical opportunities and risks. The goal is to help the reader to use ethical theory to further identify opportunities and risks within their projects and thereby to advance more directly along the path of mature and sustainable managerial practice.

  9. The Contribution of Project Environmental Assessment to Assessing and Managing Cumulative Effects: Individually and Collectively Insignificant?

    Science.gov (United States)

    Noble, Bram; Liu, Jialang; Hackett, Paul

    2017-04-01

    This paper explores the opportunities and constraints to project-based environmental assessment as a means to support the assessment and management of cumulative environmental effects. A case study of the hydroelectric sector is used to determine whether sufficient information is available over time through project-by-project assessments to support an adequate understanding of cumulative change. Results show inconsistency from one project to the next in terms of the components and indicators assessed, limited transfer of baseline information between project assessments over time, and the same issues and concerns being raised by review panels-even though the projects reviewed are operating in the same watershed and operated by the same proponent. Project environmental assessments must be managed, and coordinated, as part of a larger system of impact assessment, if project-by-project assessments are to provide a meaningful forum for learning and understanding cumulative change. The paper concludes with recommendations for improved project-based assessment practice in support of cumulative effects assessment and management.

  10. Fe, Mn, P and S speciation in sediments from the Capivara Hydroelectric Dam Lake (Brazil) as an indicator of anthropogenic influences

    Energy Technology Data Exchange (ETDEWEB)

    Ishikawa, Dilson Norio [Department of Chemistry, CCE, Londrina State University, Londrina, Parana (Brazil); Spacino Scarminio, Ieda [Laboratory of Chemometrics in Natural Sciences, Department of Chemistry, CCE, Londrina State University, Londrina, Parana (Brazil); Souza Costa, Joao de; Santos Nora, Paulo dos; Fatima Soares, Miriam de; Mansano Nicolau, Romilaine; Esteves Goncalves, Adriana Celeste; Giancoli Barreto, Sonia Regina [Laboratory of Environmental Physical Chemistry, Department of Chemistry, CCE, Londrina State University, Londrina, Parana (Brazil); Barreto, Wagner Jose

    2008-04-15

    The conservation of large water resources is essential for the preservation of human life. The quantification and, more importantly, the speciation of chemical substances that indicate the presence of anthropogenic contamination in water resources are of great importance. This paper presents the results of analysis for the determination of organic, inorganic and total phosphorus, pseudo-sulfur, and iron and manganese, in five fractions, in water sediments collected from the Capivara Hydroelectric Power Plant, Brazil. A study on the seasonal variation of these parameters was conducted, with data having been collected in the winter and in the summer, at two sites along the dam, 5 km apart, close to the city of Primeiro de Maio. Phosphorous was found in sediments and adjacent soil in the organic form (OP), and was used as an indicator of anthropogenic influence on the reservoir banks. Speciation of potentially toxic Mn showed that it is present in the exchangeable fraction of the 0-5 cm depth layer (sediment/water interface), making its transfer to the water column possible. Results from this study showed that domestic and industrial effluent treatment measures are needed for the preservation of the quality of aquatic environments. (Abstract Copyright [2008], Wiley Periodicals, Inc.)

  11. Design and construction of landslide preventive construction at Yamasubara hydroelectric power plant site. Yamasubata hatsudensho chiten ni okeru jisuberi taisaku koji no sekkei seko ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Takase, H.; Ito, M.; Sakata, M. (The Kyushu Electric Power Co. Inc., Fukuoka (Japan))

    1993-07-30

    This paper reports the design and construction of landslide preventive construction at the site of the Yamasubara hydroelectric power plant (with a maximum output of 40,700 kW) and the result of slope stability verification after completion of the construction. The moderate slope on top of the primary slide has sands presumed to be colluvial deposit distributed with a depth of 10 m or more, where occurrence of a secondary slip was feared as triggered by the primary slide. The power plant protective constructions consisted of concrete walls to protect the entire power plant including buildings, and falling stone protective fences installed around the surge tanks. The temporary measures were so set that groundwater levels are lowered to a level that can assure the slide safety factor of 1.0 or more by means of drain boring using the down-the-hole hammer type. The permanent protective construction used rock anchors that are superior in constructability and economy. The stability of sliding slope faces was verified to confirm effects of the protective constructions. The verification included observations of groundwater level behavior, water well-up from drain holes, and movements in the slopes. The result showed that the protective constructions have give sufficient effects. Continued slope stability control is important. 16 figs., 7 tabs.

  12. Potential effects of hydroelectric dam development in the Mekong River basin on the migration of Siamese mud carp (Henicorhynchus siamensis and H. lobatus elucidated by otolith microchemistry.

    Directory of Open Access Journals (Sweden)

    Michio Fukushima

    Full Text Available The migration of Siamese mud carp (Henicorhynchus siamensis and H. lobatus, two of the most economically important fish species in the Mekong River, was studied using an otolith microchemistry technique. Fish and river water samples were collected in seven regions throughout the whole basin in Thailand, Laos and Cambodia over a 4 year study period. There was coherence between the elements in the ambient water and on the surface of the otoliths, with strontium (Sr and barium (Ba showing the strongest correlation. The partition coefficients were 0.409-0.496 for Sr and 0.055 for Ba. Otolith Sr-Ba profiles indicated extensive synchronized migrations with similar natal origins among individuals within the same region. H. siamensis movement has been severely suppressed in a tributary system where a series of irrigation dams has blocked their migration. H. lobatus collected both below and above the Khone Falls in the mainstream Mekong exhibited statistically different otolith surface elemental signatures but similar core elemental signatures. This result suggests a population originating from a single natal origin but bypassing the waterfalls through a passable side channel where a major hydroelectric dam is planned. The potential effects of damming in the Mekong River are discussed.

  13. Feeding ecology of Leporinus taeniofasciatus (Characiformes: Anostomidae before and after installation of a hydroelectric plant in the upper rio Tocantins, Brazil

    Directory of Open Access Journals (Sweden)

    Miriam P. Albrecht

    Full Text Available The feeding ecology of Leporinus taeniofasciatus in the upper rio Tocantins was characterized before (river phase and after (reservoir phase its impoundment by the Serra da Mesa Hydroelectric Dam. The importance of each food item was given by the Alimentary Index (IAi, which combines the frequency of occurrence and volumetric methods. A significant difference in the diet of L. taeniofasciatus between seasons in the river phase, detected by a multivariate analysis of variance, was not kept when the reservoir was formed. Its feeding activity, verified through the percentage of stomachs with different degrees of fullness, was not affected by the impoundment. Leporinus taeniofasciatus was able to incorporate terrestrial food items to its diet when they became abundantly available at the beginning of reservoir formation. Despite this plasticity, secondary factors such as predation and competition might have affected its adaptation in the new, more homogeneous environment. Its diet was not significantly different in the lotic sites between the distinct phases, suggesting that the remaining upstream lotic environments still provide favorable conditions for this species, reinforcing the need to preserve those habitats, as L. taeniofasciatus, which is apparently endemic to the Tocantins basin, may be threatened.

  14. Evaluation of advanced turbomachinery for underground pumped hydroelectric storage. Part 3. Multistage unregulated pump/turbines for operating heads of 1000 to 1500 m

    Energy Technology Data Exchange (ETDEWEB)

    Frigo, A.A.; Pistner, C.

    1980-08-01

    This is the final report in a series of three on studies of advanced hydraulic turbomachinery for underground pumped hydroelectric storage. All three reports address Francis-type, reversible pump/turbines. The first report covered single-stage regulated units; the second report covered two-stage regulated units; the present report covers multistage unregulated units. Multistage unregulated pump/turbines offer an economically attractive option for heads of 1000 to 1500 m. The feasibility of developing such machines for capacities up to 500 MW and operating heads up to 1500 m has been evaluated. Preliminary designs have been generated for six multistage pump/turbines. The designs are for nominal capacities of 350 and 500 MW and for operating heads of 1000, 1250, and 1500 m. Mechanical, hydraulic, and economic analyses indicate that these machines will behave according to the criteria used to design them and that they can be built at a reasonable cost with no unsolvable problems. Efficiencies of 85.8% and 88.5% in the generating and pumping modes, respectively, can be expected for the 500-MW, 1500-m unit. Performances of the other five machines are at least comparable, and usually better. Over a 1000 to 1500-m head range, specific $/kW costs of the pump/turbines in mid-1978 US dollars vary from 19.0 to 23.1 for the 500-MW machines, and from 21.0 to 24.1 for the 350-MW machines.

  15. Virtual projects

    DEFF Research Database (Denmark)

    Svejvig, Per; Commisso, Trine Hald

    2012-01-01

    Virtual projects are common with global competition, market development, and not least the financial crisis forcing organizations to reduce their costs drastically. Organizations therefore have to place high importance on ways to carry out virtual projects and consider appropriate practices...... for performing these projects. This paper compares best practices with practiced practices for virtual projects and discusses ways to bridge the gap between them. We have studied eleven virtual projects in five Danish organizations and compared them with a predefined list of best practices compiled from...... that the best practice knowledge has not permeated sufficiently to the practice. Furthermore, the appropriate application of information and communication technology (ICT) remains a big challenge, and finally project managers are not sufficiently trained in organizing and conducting virtual projects...

  16. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...... into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... multiply in interaction with project management technologies and how conventional linear conceptions of project time may be contested with the emergence of new non-human stakeholders and temporalities. Research limitations/implications – The study draws on ANT to show how animals can become stakeholders...

  17. Project Operations: Partners and Support (Work Management Policies)

    National Research Council Canada - National Science Library

    Williams, Otis

    1996-01-01

    .... Army Corps of Engineers (USACE) personnel performing civil works functions related to flood control, navigation, dredging, hydroelectric power generation, environmental stewardship, and recreation services at water resource...

  18. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    2004-01-01

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project

  19. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......- as well as macro-level concerns around projects; and (2) there has been a greater interest in different kinds of scholarly inquiry. Taken together, these two developments call for closer scrutiny of how the levels of analysis and the types of inquiry are related and benefit each other...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  20. Alzheimer's Project

    Medline Plus

    Full Text Available ... voluntary health organization in Alzheimer's care, support and research, the Alzheimer's Association has been an active partner in "THE ALZHEIMER'S PROJECT," ... (48 minutes) "Momentum ...

  1. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-03-01

    to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.

  2. PROJECT REPORT

    African Journals Online (AJOL)

    medakubu

    We here present a very preliminary report on a field project entitled 'Vanishing. Voices from Ghana's Middle Belt', an Endangered Languages Documentation Project funded by the Endangered Languages Documentation Program based at the School of. Oriental and African Studies, University of London. It is being carried ...

  3. Project Games

    NARCIS (Netherlands)

    Estevez Fernandez, M.A.; Borm, P.E.M.; Hamers, H.J.M.

    2005-01-01

    This paper studies situations in which a project consisting of several activities is not executed as planned.It is divided into three parts.The first part analyzes the case where the activities may be delayed; this possibly induces a delay on the project as a whole with additional costs.Associated

  4. Alzheimer's Project

    Medline Plus

    Full Text Available ... state Home > News & Events > Upcoming Events > HBO Alzheimer’s Project In the News Walk to End Alzheimer's Upcoming ... Disease Awareness Month World Alzheimer's Month HBO Alzheimer’s Project MAKE A DONATION Your gift will help us ...

  5. LEX Project

    DEFF Research Database (Denmark)

    Damkilde, Lars; Larsen, Torben J.; Walbjørn, Jacob

    This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept.......This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept....

  6. Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Phase I, Volume Two (A), Clark Fork Projects, Thompson Falls Dam, Operator, Montana Power Company.

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Marilyn

    1984-03-27

    The Thompson Falls Dam inundated approximately 347 acres of wildlife habitat that likely included conifer forests, deciduous bottoms, mixed conifer-deciduous forests and grassland/hay meadows. Additionally, at least one island, and several gravel bars were inundated when the river was transformed into a reservoir. The loss of riparian and riverine habitat adversely affected the diverse wildlife community inhabiting the lower Clark Fork River area. Quantitative loss estimates were determined for selected target species based on best available information. The loss estimates were based on inundation of the habitat capable of supporting the target species. Whenever possible, loss estimates bounds were developed by determining ranges of impacts based on density estimates and/or acreage loss estimates. Of the twelve target species or species groups, nine were assessed as having net negative impacts. 86 refs., 2 figs., 5 tabs.

  7. Methodology for maintenance analysis based on hydroelectric power stations reliability; Metodologia para realizar analisis de mantenimiento basado en confiabilidad en centrales hidroelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Rea Soto, Rogelio; Calixto Rodriguez, Roberto; Sandoval Valenzuela, Salvador; Velasco Flores, Rocio; Garcia Lizarraga, Maria del Carmen [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2012-07-01

    A methodology to carry out Reliability Centered Maintenance (RCM) studies for hydroelectric power plants is presented. The methodology is an implantation/extension of the guidelines proposed by the Engineering Society for Advanced Mobility Land, Sea and Space in the SAE-JA1012 standard. With the purpose of answering the first five questions, that are set out in that standard, the use of standard ISO14224 is strongly recommended. This approach standardizes failure mechanisms and homogenizes RCM studies with the process of collecting failure and maintenance data. The use of risk matrixes to rank the importance of each failure based on a risk criteria is also proposed. [Spanish] Se presenta una metodologia para realizar estudios de mantenimiento Basado en Confiabilidad (RCM) aplicados a la industria hidroelectrica. La metodologia es una implantacion/ extension realizada por los autores de este trabajo, de los lineamientos propuestos por la Engineering Society for Advanced Mobility Land, Sea and Space en el estandar SAE-JA1012. Para contestar las primeras cinco preguntas del estandar se propone tomar como base los modos y mecanismos de fallas de componentes documentados en la guia para recopilar datos de falla en el estandar ISO-14224. Este enfoque permite estandarizar la descripcion de mecanismos de fallas de los equipos, tanto en el estudio RCM como en el proceso de recopilacion de datos de falla y de mantenimiento, lo que permite retroalimentar el ciclo de mejora continua de los procesos RCM. Tambien se propone el uso de matrices de riesgo para jerarquizar la importancia de los mecanismos de falla con base en el nivel de riesgo.

  8. The Impacts of Wind Speed Trends and 30-Year Variability in Relation to Hydroelectric Reservoir Inflows on Wind Power in the Pacific Northwest.

    Directory of Open Access Journals (Sweden)

    Benjamin D Cross

    Full Text Available In hydroelectric dominated systems, the value and benefits of energy are higher during extended dry periods and lower during extended or extreme wet periods. By accounting for regional and temporal differences in the relationship between wind speed and reservoir inflow behavior during wind farm site selection, the benefits of energy diversification can be maximized. The goal of this work was to help maximize the value of wind power by quantifying the long-term (30-year relationships between wind speed and streamflow behavior, using British Columbia (BC and the Pacific Northwest (PNW as a case study. Clean energy and self-sufficiency policies in British BC make the benefits of increased generation during low streamflow periods particularly large. Wind density (WD estimates from a height of 10m (North American Regional Reanalysis, NARR were correlated with cumulative usable inflows (CUI for BC (collected from BC Hydro for 1979-2010. The strongest WD-CUI correlations were found along the US coast (r ~0.55, whereas generally weaker correlations were found in northern regions, with negative correlations (r ~ -0.25 along BC's North Coast. Furthermore, during the lowest inflow years, WD anomalies increased by up to 40% above average values for the North Coast. Seasonally, high flows during the spring freshet were coincident with widespread negative WD anomalies, with a similar but opposite pattern for low inflow winter months. These poorly or negatively correlated sites could have a moderating influence on climate related variability in provincial electricity supply, by producing greater than average generation in low inflow years and reduced generation in wet years. Wind speed and WD trends were also analyzed for all NARR grid locations, which showed statistically significant positive trends for most of the PNW and the largest increases along the Pacific Coast.

  9. COMPARISON OF CALCULATED AND OBSERVED SEISMIC ACCELERATIONS IN COMPOSITE-TYPE ROCK-FILL DAM OF THE DNESTROVSKAYA HYDRO-ELECTRIC POWER PLANT DURING EXPERIMENTAL EXPLOSIONS

    Directory of Open Access Journals (Sweden)

    A. A. Matvienko

    2016-01-01

    Full Text Available A methodology for determination of seismic accelerations in earth dams has been developed within the framework of seismic resistance wave theory. In this case we take into account an influence of the dam foundation and seismic wave emission into it. The methodology is based on numerical solution of the dynamic problem while using a finite difference method. A software program SGD “Determination of seismic acceleration in the earth dam” has been prepared on the basis of the developed methodology. The program allows to evaluate ordinates of calculation orthographic representations for acceleration throughout the dam height for all time moments. Thus, it is possible to obtain the most dangerous acceleration orthographic representations at direct and reverse seismic actions. The papers presents verification (compliance test of calculated and observed seismic accelerations for the rock-fill dam of the Dnestrovskaya Hydro-Electric Power Plant No 1. The observed seismic accelerations have been obtained during experimental explosions. The calculated seismic accelerations have been obtained in accordance with the proposed methodology for determination of seismic accelerations in the earth dams. A comparative analysis of calculation results with the data of field observations has demonstrated that a maximum difference between extreme accelerations obtained by calculation, and during field observations, do not exceed 10.11 % for the dam crest, and 6.56 % for its bottom. The obtained results permit to recommend the developed program for engineering calculations of seismic accelerations in the earth dams. The program application will make it possible to determine seismic acceleration in the earth dam with sufficient reliability.

  10. The effect of rapid and sustained decompression on barotrauma in juvenile brook lamprey and Pacific lamprey: implications for passage at hydroelectric facilities

    Energy Technology Data Exchange (ETDEWEB)

    Colotelo, Alison HA; Pflugrath, Brett D.; Brown, Richard S.; Brauner, Colin J.; Mueller, Robert P.; Carlson, Thomas J.; Deng, Zhiqun; Ahmann, Martin L.; Trumbo, Bradly A.

    2012-10-01

    Fish passing downstream through hydroelectric facilities may pass through hydroturbines where they experience a rapid decrease in barometric pressure as they pass by turbine blades, which can lead to barotraumas including swim bladder rupture, exopthalmia, emboli, and hemorrhaging. In juvenile Chinook salmon, the main mechanism for injury is thought to be expansion of existing gases (particularly those present in the swim bladder) and the rupture of the swim bladder ultimately leading to exopthalmia, emboli and hemorrhaging. In fish that lack a swim bladder, such as lamprey, the rate and severity of barotraumas due to rapid decompression may be reduced however; this has yet to be extensively studied. Another mechanism for barotrauma can be gases coming out of solution and the rate of this occurrence may vary among species. In this study, juvenile brook and Pacific lamprey acclimated to 146.2 kPa (equivalent to a depth of 4.6 m) were subjected to rapid (<1 sec; brook lamprey only) or sustained decompression (17 minutes) to a very low pressure (13.8 kPa) using a protocol previously applied to juvenile Chinook salmon. No mortality or evidence of barotraumas, as indicated by the presence of hemorrhages, emboli or exopthalmia, were observed during rapid or sustained decompression, nor following recovery for up to 120 h following sustained decompression. In contrast, mortality or injury would be expected for 97.5% of juvenile Chinook salmon exposed to a similar rapid decompression to these very low pressures. Additionally, juvenile Chinook salmon experiencing sustained decompression died within 7 minutes, accompanied by emboli in the fins and gills and hemorrhaging in the tissues. Thus, juvenile lamprey may not be susceptible to barotraumas associated with hydroturbine passage to the same degree as juvenile salmonids, and management of these species should be tailored to their specific morphological and physiological characteristics.

  11. The Impacts of Wind Speed Trends and 30-Year Variability in Relation to Hydroelectric Reservoir Inflows on Wind Power in the Pacific Northwest.

    Science.gov (United States)

    Cross, Benjamin D; Kohfeld, Karen E; Bailey, Joseph; Cooper, Andrew B

    2015-01-01

    In hydroelectric dominated systems, the value and benefits of energy are higher during extended dry periods and lower during extended or extreme wet periods. By accounting for regional and temporal differences in the relationship between wind speed and reservoir inflow behavior during wind farm site selection, the benefits of energy diversification can be maximized. The goal of this work was to help maximize the value of wind power by quantifying the long-term (30-year) relationships between wind speed and streamflow behavior, using British Columbia (BC) and the Pacific Northwest (PNW) as a case study. Clean energy and self-sufficiency policies in British BC make the benefits of increased generation during low streamflow periods particularly large. Wind density (WD) estimates from a height of 10m (North American Regional Reanalysis, NARR) were correlated with cumulative usable inflows (CUI) for BC (collected from BC Hydro) for 1979-2010. The strongest WD-CUI correlations were found along the US coast (r ~0.55), whereas generally weaker correlations were found in northern regions, with negative correlations (r ~ -0.25) along BC's North Coast. Furthermore, during the lowest inflow years, WD anomalies increased by up to 40% above average values for the North Coast. Seasonally, high flows during the spring freshet were coincident with widespread negative WD anomalies, with a similar but opposite pattern for low inflow winter months. These poorly or negatively correlated sites could have a moderating influence on climate related variability in provincial electricity supply, by producing greater than average generation in low inflow years and reduced generation in wet years. Wind speed and WD trends were also analyzed for all NARR grid locations, which showed statistically significant positive trends for most of the PNW and the largest increases along the Pacific Coast.

  12. Impact on the aquatic environment of hydro-peaking in hydroelectric plants; Impact sur le milieu aquatique de la gestion par eclusees des usines hydroelectriques

    Energy Technology Data Exchange (ETDEWEB)

    Sabaton, C.; Lauters, F.; Valentin, S.

    1996-12-31

    There are a number of types of hydroelectric installations on French rivers. Some of these intermittently turbine water stored in dammed reservoirs, in order to use available reserves at the most opportune moment for power generation. These plants, run under `hydro-peaking` management procedures, cause variations in discharge in river sections downstream of the restitution, on a daily or weekly scale. To answer questions concerning the impact of such variations in discharge on the aquatic environment, EDF launched a research program aimed at describing and better understanding the physical and biological phenomena related to hydro-peaking and assessing the possible impact of this type of plant management on French streams. Seven sites subjects to hydro-peaking were studied on rivers with mean flow rates lower than 20 m{sup 3}/s (which corresponds to over 65 % of EDF hydro-peaking sites). Four themes in particular were examined: hydraulic characterization of hydro-peaking, modifications in thermal regime and water quality, response of benthic invertebrates and response of fish populations to hydro-peaking. For fish as well as for invertebrates, the role of the base discharge - in the absence of peaking flow - and that of the morphology of the river bed (and, in particular, the presence of shelter for fish) during periods of strong discharge were clearly highlighted. Impact assessment requires a precise diagnosis of the state of biocenoses. To carry out such a diagnosis, one must reason in terms of species, life phase (particularly the most sensitive phases) and population structure as well as the type of stream and the faunizone involved. A risk assessment is possible by means of simultaneous study of the morphology of the river bed and the response of the signal generated by hydro-peaking in terms of hydrology and physical characteristics downstream of the restitution. (authors). 25 refs.

  13. The influence of the Gilgel-Gibe hydroelectric dam in Ethiopia on caregivers' knowledge, perceptions and health-seeking behaviour towards childhood malaria

    Directory of Open Access Journals (Sweden)

    Duchateau Luc

    2010-02-01

    Full Text Available Abstract Background Malaria remains the most important public health problem in tropical and subtropical areas. Mothers' or caregivers' ability to recognize childhood malaria-related morbidity is crucial as knowledge, attitudes and health seeking behavior of caregivers towards childhood malaria could influence response to signs of the disease. Methods A total of 1,003 caregivers in 'at-risk' villages in close proximity to the Gilgel-Gibe hydroelectric dam in south-western Ethiopia, and 953 caregivers in 'control' villages further away from the dam were surveyed using structured questionnaires to assess their knowledge, perceptions and health seeking behaviour about childhood malaria. Results Malaria (busa was ranked as the most serious health problem. Caregivers perceived childhood malaria as a preventable ('at-risk' 96%, 'control' 86% and treatable ('at-risk' 98% and 'control' 96% disease. Most caregivers correctly associated the typical clinical manifestations with malaria attacks. The use of insecticide-treated nets (ITNs was mentioned as a personal protective measure, whereas the role of indoor residual spraying (IRS in malaria prevention and control was under-recognized. Most of the caregivers would prefer to seek treatment in health-care services in the event of malaria and reported the use of recommended anti-malarials. Conclusion Health education to improve knowledge, perceptions and health-seeking behaviour related to malaria is equally important for caregivers in 'at risk' villages and caregivers in 'control' villages as minimal differences seen between both groups. Concluding, there may be a need of more than one generation after the introduction of the dam before differences can be noticed. Secondly, differences in prevalence between 'control' and 'at-risk' villages may not be sufficient to influence knowledge and behaviour.

  14. Effects of Hydroelectric Dam Operations on the Restoration Potential of Snake River Fall Chinook Salmon (Oncorhynchus tshawytscha) Spawning Habitat Final Report, October 2005 - September 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Hanrahan, Timothy P.; Richmond, Marshall C.; Arntzen, Evan V. [Pacific Northwest National Laboratory

    2007-11-13

    This report describes research conducted by the Pacific Northwest National Laboratory for the Bonneville Power Administration (BPA) as part of the Fish and Wildlife Program directed by the Northwest Power and Conservation Council. The study evaluated the restoration potential of Snake River fall Chinook salmon spawning habitat within the impounded lower Snake River. The objective of the research was to determine if hydroelectric dam operations could be modified, within existing system constraints (e.g., minimum to normal pool levels; without partial removal of a dam structure), to increase the amount of available fall Chinook salmon spawning habitat in the lower Snake River. Empirical and modeled physical habitat data were used to compare potential fall Chinook salmon spawning habitat in the Snake River, under current and modified dam operations, with the analogous physical characteristics of an existing fall Chinook salmon spawning area in the Columbia River. The two Snake River study areas included the Ice Harbor Dam tailrace downstream to the Highway 12 bridge and the Lower Granite Dam tailrace downstream approximately 12 river kilometers. These areas represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We used a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats was the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Fall Chinook salmon spawning habitat use data, including water depth, velocity, substrate size and channelbed slope, from the Wanapum reference area were used to define spawning habitat suitability based on these variables. Fall Chinook salmon spawning habitat suitability of the Snake River study areas was estimated by applying the Wanapum reference reach habitat

  15. Enhancing the resiliency of small hydropower projects: environmental function, modularity, and stakeholder elicitation as design priorities

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Adam M [ORNL; Smith, Brennan T [ORNL

    2017-01-01

    Small hydropower plants supply reliable renewable energy to the grid, though few new plants have been developed in the Unites States over the past few decades due to complex environmental challenges and poor project economics. This paper describes the current landscape of small hydropower development, and introduces a new approach to facility design that co-optimizes the extraction of hydroelectric power from a stream with other important environmental functions such as fish, sediment, and recreational passage. The approach considers hydropower facilities as an integrated system of standardized interlocking modules, designed to sustain stream functions, generate power, and interface with the streambed. It is hypothesized that this modular eco-design approach, when guided by input from the broader small hydropower stakeholder community, can lead to cost savings across the facility, reduced licensing and approval timelines, and ultimately, to enhanced resiliency through improved environmental performance over the lifetime of the project.

  16. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  17. Freedom Project

    Directory of Open Access Journals (Sweden)

    Alejandra Suarez

    2014-02-01

    Full Text Available Freedom Project trains prisoners in nonviolent communication and meditation. Two complementary studies of its effects are reported in this article. The first study is correlational; we found decreased recidivism rates among prisoners trained by Freedom Project compared with recidivism rates in Washington state. The second study compared trained prisoners with a matched-pair control group and found improvement in self-reported anger, self-compassion, and certain forms of mindfulness among the trained group. Ratings of role-plays simulating difficult interactions show increased social skills among the group trained by Freedom Project than in the matched controls.

  18. Projective geometry

    CERN Document Server

    Faulkner, T Ewan

    2006-01-01

    This text explores the methods of the projective geometry of the plane. Some knowledge of the elements of metrical and analytical geometry is assumed; a rigorous first chapter serves to prepare readers. Following an introduction to the methods of the symbolic notation, the text advances to a consideration of the theory of one-to-one correspondence. It derives the projective properties of the conic and discusses the representation of these properties by the general equation of the second degree. A study of the relationship between Euclidean and projective geometry concludes the presentation. Nu

  19. Transmission avoided cost: a new parameter to evaluate the economic competitiveness of generations plants projects

    Energy Technology Data Exchange (ETDEWEB)

    Ramos, D.S. [Companhia Energetica de Sao Paulo, SP (Brazil); Albuquerque, J.C.R.; Rosenblat, J. [ELETROBRAS, Rio de Janeiro, RJ (Brazil)

    1994-12-31

    The paper presents a new formulation that makes feasible a composition of long run production marginal costs with the long run transmission marginal costs, including the costs related to the interconnection EHV networks and that related to the voltage levels below. The goal top be attained is to have available a more adequate parameter in order to compare production cost related to a plant, that will be connected to a certain voltage level network, to the cost related supplying the sam,e amount of energy from the bulk power system which will be represented by the marginal costs up to the voltage level under consideration. This procedure brings to light the Transmission Avoided Costs concepts, that are stressed throughout the text. The proposed methodology is now being used, in the brazilian Power Sector, as a rule of thumb in order to guide planning decisions about the schedule of new plants that have installed capacity below 30 MW. For plants with higher capacity, the transmission avoided costs are evaluated for each specific case, simulating the system behavior without the quoted hydroelectric plant. This paper focuses, an an application example, the case of the Canoas Hydroelectric Project, recently included in the Generation Expansion Reference Plan after a detailed analysis supported by the methodology described here. (author) 7 refs., 3 tabs.

  20. Risk and mitigation in the privately financed hydropower project Birecik, Turkey; Privat finanzierte Wasserkraft, Birecik, Tuerkei - Risiken und Risikoverteilung

    Energy Technology Data Exchange (ETDEWEB)

    Koselleck, F.; Ishay, D. [PH Ventures GmbH, Neu-Isenburg (Germany)

    2003-07-01

    The 627 MW Hydroelectric Power Plant Birecik, Turkey, is the largest privately financed hydropower project realized wordwide under a BOT (Build Operate Transfer) scheme. The total investment volume adds up to almost 1 Bll Euro. Ther financial structure of the project mostly relies on export credits, which have been arranged under an international consortium of 50 banks. A complex contractual structure between the government, the investors and the contractors succeeded in establishing a fair risk mitigation mechanism, which was a central factor for the overall success of the project. [German] Das 672 MW Wasserkraftwerk Birecik, Tuerkei, ist mit einem Investitionsvolumen von rund Euro 1 Mrd. das bisher weltweit groesste Wasserkraftprojekt, das nach dem BOT-Modell realisiert wurde. Die auf Exportkredite basierende Finanzierung wurde ueber ein internationales Konsortium von 50 Banken dargestellt. Eine komplexe Vertragsstruktur zwischen dem Staat, den Investoren und den Auftragsnehmern fuehrte zu einem ausgeglichenen Risikoverteilungsmechanismus, der ausschlaggebend fuer den Erfolg des Projektes war. (orig.)

  1. Alzheimer's Project

    Medline Plus

    Full Text Available ... leading community engagement. Talk about the films on our message board . Watch films free online now "The ... ALZHEIMER'S PROJECT" will expose the Alzheimer's crisis facing our nation and drive concerned citizens to take action. ...

  2. Project LEAF

    Science.gov (United States)

    Project LEAF has a goal of educating farmworkers about how to reduce pesticide exposure to their families from pesticide residues they may be inadvertently taking home on their clothing, etc. Find outreach materials.

  3. Alzheimer's Project

    Medline Plus

    Full Text Available ... National Alzheimer's Gala A Night at Sardi's Alzheimer's Disease Awareness Month World Alzheimer's Month HBO Alzheimer’s Project ... takes a look at the faces behind the disease - and the forces leading us to find a ...

  4. Alzheimer's Project

    Medline Plus

    Full Text Available ... disease has on those with Alzheimer's and their families. September 14, 2009 "The Alzheimer's Project" wins two ... way Americans thinks about Alzheimer's disease. Tell your family and friends. Post info on your Web site . ...

  5. Alzheimer's Project

    Medline Plus

    Full Text Available | News | Events | Press | Contact 24/7 Helpline: 1.800.272.3900 Find your chapter: search by state Home > News & Events > Upcoming Events > HBO Alzheimer’s Project In the News Walk to End ...

  6. Alzheimer's Project

    Medline Plus

    Full Text Available ... Momentum in Science, Part 2" (70 minutes) Be a part of something big. HBO's "THE ALZHEIMER'S PROJECT" ... 800-272-3900 Find Your Local Chapter Get the facts 10 warning signs What is dementia What ...

  7. Alzheimer's Project

    Medline Plus

    Full Text Available ... your family and friends. Post info on your Web site . Become an Alzheimer's champion. Help support vital research and services. "THE ALZHEIMER'S PROJECT" is a presentation of HBO ...

  8. Alzheimer's Project

    Science.gov (United States)

    ... Alzheimer’s Project In the News Walk to End Alzheimer's Upcoming Events AAIC Advocacy Forum Rita Hayworth Gala - New York Rita Hayworth Gala - Chicago National Alzheimer's Gala A Night at Sardi's Alzheimer's Disease Awareness ...

  9. Alzheimer's Project

    Medline Plus

    Full Text Available ... voluntary health organization in Alzheimer's care, support and research, the Alzheimer's Association has been an active partner in "THE ALZHEIMER'S PROJECT," providing expert insight and leading community engagement. Talk about the films on our message ...

  10. Alzheimer's Project

    Medline Plus

    Full Text Available ... 14, 2009 "The Alzheimer's Project" wins two Creative Arts Emmys Two installments of the multi-part HBO ... from the Alzheimer's Association and others, won Creative Arts Emmy awards. "The Memory Loss Tapes" was honored ...

  11. Alzheimer's Project

    Medline Plus

    Full Text Available ... Alzheimer's Project," produced with help from the Alzheimer's Association and others, won Creative Arts Emmy awards. "The ... in Alzheimer's care, support and research, the Alzheimer's Association has been an active partner in "THE ALZHEIMER'S ...

  12. Project Reptile!

    Science.gov (United States)

    Diffily, Deborah

    2001-01-01

    Integrating curriculum is important in helping children make connections within and among areas. Presents a class project for kindergarten children which came out of the students' interests and desire to build a reptile exhibit. (ASK)

  13. Alzheimer's Project

    Medline Plus

    Full Text Available ... Emmys Two installments of the multi-part HBO documentary "The Alzheimer's Project," produced with help from the Alzheimer's Association and others, won Creative Arts Emmy awards. "The Memory Loss Tapes" was honored ...

  14. Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception......In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception...

  15. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  16. Tsuwalhkalh Ti Tmicwa (The Land is Ours): Stat'imc Self-Determination in the Face of Large-Scale Hydro-electric Development

    Science.gov (United States)

    Moritz, Sarah Carmen

    In Canada, First Nations asserting authority over their lands are developing diverse strategies to overcome the state''s dogmatic insistence on jurisdictional sovereignty. This movement corresponds to the wider context of the challenges faced by indigenous people to use their own ways of knowing to resist or reformulate legal doctrines and political tenets based on colonial power. Interior Salish Stat'imc people identify themselves through a strong and ongoing social relationship with Sataqwa7, the Fraser River, and the "Valley of Plenty"---now known as the flooded Bridge River Valley---maintained through Stat'imc knowledge and cultural practice and demonstrated by talk of '"the Stat'imc right to fish" and Tsuwalhkalh Ti Tmicwa (The Land is Ours). Stat'imc fishers are prepared to contest and resist any regulatory system that is understood to impact this right to fish while they advocate their own ways of sustainable fishing and water management. Based on ethnographic research in collaboration with Stat'imc people, this thesis explores some of these often successful contestations especially in the context of increasing territorial governance and by example of the rapidly transforming relationship between Stat'imc, BC Hydro and the Province of BC. Interior Salish Stat'imc people are currently navigating through a significant phase of increasing jurisdiction and authority and recognition of (unsettled) territorial property relationships. This very dynamic process is marked by strategic collaborations, compensation for 'infringements' on St'a'imc Title and Rights, and conservation efforts to protect their home. An important example is the changing relationship between Stat'imc people and BC Hydro---a relationship between two groups with radically different cultures and agendas: Stat'imc people in a struggle for self-determination, social justice and cultural survival and BC Hydro, a corporate culture, with the agenda to provide hydro-electric power to BC, maintain

  17. Ecologically justified regulatory provisions for riverine hydroelectric power plants and minimum instream flow requirements in diverted streams; Oekologisch begruendete, dynamische Mindestwasserregelungen bei Ausleitungskraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Jorde, K.

    1997-12-31

    The study was intended to develop a model versatile enough to permit quantification of various water demand scenarios in connection with operation of riverine hydroelectric power plants. Specific emphasis was to be placed on defining the minimum instream flow to be maintained in river segments because of the elementary significance to flowing water biocinoses. Based on fictitious minimum water requirements, various scenarious were simulated for flow regimes depending on power plant operation, so as to establish a system for comparative analysis and evaluation of resulting economic effects on power plant efficiency on the one hand, and the ecologic effects on the aquatic habitat. The information derived was to serve as a basis for decision-making for regulatory purposes. For this study, the temporal and spatial variability of the flow regime at the river bed in a river segment was examined for the first time. Based on this information, complemented by information obtained from habitat simulations, a method was derived for determination of ecologic requirements and their incorporation into regulatory water management provisions. The field measurements were carried out with the FST hemisphere as a proven and most efficient and reliable method of assessing flow regimes at river beds. Evaluation of the measured instream flow data characterising three morphologically different segments of diverted rivers was done with the CASIMIR computer code. The ASS models derived were used for comparative assessment of existing regulatory provisions and recommended amendments determining required minimum instream flow in diverted rivers. The requirements were defined taking as a basis data obtained for three different years. (orig./CB) [Deutsch] Ziel der Arbeit war die Entwicklung eines Modellverfahrens, das flexibel die Quantifizierung unterschiedlicher Nutzansprueche an Laufwasserkraftanlagen ermoeglicht. Insbesondere der Erhalt einer gewissen Dynamik, die fuer

  18. Multidisciplinary studies on hydric, energetic and environmental resources, evaluating the hydroelectric plants energy surplus as alternative for hydrogen production; Estudos multidisciplinares na area de recursos hidricos, energeticos e ambientais, avaliando-se o uso de energia excedente de hidreletricas como alternativa para producao de hidrogenio

    Energy Technology Data Exchange (ETDEWEB)

    Mariotoni, Carlos Alberto; Naturesa, Jim Silva; Santos Junior, Joubert Rodrigues; Demanboro, Antonio Carlos [Universidade Estadual de Campinas (UNICAMP), SP (Brazil). Faculdade de Engenharia Civil. Grupo de Planejamento Energetico e Sistemas Eletricos]. E-mails: cam@fec.unicamp.br; jimnaturesa@yahoo.com; joubert.dos@terra.com.br; anto1810@fec.unicamp.br

    2006-07-01

    The researchers on energy, hydraulic and environmental subjects have been discussing the perspective and both the technical and economic viability of using the exceeding energy of hydroelectric power plants to produce hydrogen, taking into consideration the resources optimizations and the maximization of the economic gains. The researches and technicians of the Brazilian energy sector have considered, the increasing possibility of using of exceeding energy from hydroelectric power plants to produce hydrogen, mainly for the special case of the bi-national hydroelectric of Itaipu. Nevertheless it is important to present a discussion about the use and the production of hydrogen in Brazilian context considering, mainly, the consolidated experience of certain research centers and national laboratories. The paper also presents a discussions about the main technical characteristics, the electro electronic devices used and a brief discussion about the possibility of electric energy expansion, through the use of FACTS devices, for the southeast region of the country having the hydrogen as an important fuel. (author)

  19. Echo project

    DEFF Research Database (Denmark)

    Gfader, Verina; Carson, Rebecca; Kraus, Chris

    2016-01-01

    Echo project (ed. by Verina Gfader and Ruth Höflich) is an online publication and community board that developed from a visit to the Los Angeles Art Book fair in January 2014. It was on the occasion of a prior book project, titled Prospectus, that the editorial team had been invited by the LAABF...... Intellect and Financialization sets a conceptual ground for rethinking subjective freedom; an encounter with Another LA opens out a multitude of cartographies - revealing more discreet and politically dynamic movements in the urban grid; there are glimpses of Machine Project’s events, a visual story around...

  20. VT Renewable Energy Sites - Hydroelectric

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The Renewable Energy Atlas of Vermont and this dataset were created to assist town energy committees, the Clean Energy Development Fund and other...

  1. Mathematical models for long-term management of a hydroelectric power production network. Modeles mathematiques pour la gestion a long terme d'un reseau de production hydro-electrique

    Energy Technology Data Exchange (ETDEWEB)

    Bouchard, H.

    1993-08-01

    The problem of long-term (5-20 y) management of an electric power producing network where hydroelectric power dominates is analyzed. The various aspects of a computerized system used to aid in the management of a network of hydroelectric reservoirs are studied as well as the different mathematical models which are applicable. An aggregate model is first considered in which the problem of water management in the reservoirs, the key problem in long-term planning, is handled by replacing multiple stocks of water in multiple reservoirs by a single imaginary reservoir. Two aggregation studies are performed: the first examining the hypothesis of independence between the water level in a reservoir and the production factor of the downstream plant, and the second in which the production factor varies with the level of the upstream reservoir. The function of sales profit is then examined in a study of the optimization of short-term profit. Long term management decisions are subsequently studied using discrete stochastic dynamic programming. The matrix-based ARMA model is used to simulate natural inputs to the reservoirs. Four cases of ARMA models are considered: stationary univariant, periodic univariant, stationary multivariant and periodic multivariant. 49 refs., 2 tabs.

  2. FLOAT Project

    DEFF Research Database (Denmark)

    Sørensen, Eigil V.; Aarup, Bendt

    The objective of the FLOAT project is to study the reliability of high-performance fibre-reinforced concrete, also known as Compact Reinforced Composite (CRC), for the floats of wave energy converters. In order to reach a commercial breakthrough, wave energy converters need to achieve a lower price...

  3. THE PROJECT

    Directory of Open Access Journals (Sweden)

    P.M. Latyshev

    2008-09-01

    Full Text Available "Urals Industrial - Urals Polar" is the unique project and thus it will provide the economic security not only of the local territory but of the whole Russia in terms of several courses. This article is devoted to the main courses of these ones and their influence on the economy of the country.

  4. Alzheimer's Project

    Medline Plus

    Full Text Available ... Chicago National Alzheimer's Gala A Night at Sardi's Alzheimer's Disease Awareness Month World Alzheimer's Month HBO Alzheimer’s Project ... help us change the way Americans thinks about Alzheimer's disease. Tell your family and friends. Post info on ...

  5. PROJECT REPORT

    African Journals Online (AJOL)

    Office 2004 Test Drive User

    Description and Documentation of an Endangered Language of Ivory ... A language documentation project is summed up briefly in this work-in-progress ..... which captures the system of the language. Even now there are many uncertainties in the glossing of grammatical words, and some constructions are still opaque.

  6. Project Avatar

    DEFF Research Database (Denmark)

    Juhlin, Jonas Alastair

    'Project Avatar' tager udgangspunkt i den efterretningsdisciplin, der kaldes Open Source Intelligence og indebærer al den information, som ligger frit tilgængeligt i åbne kilder. Med udbredelsen af sociale medier åbners der op for helt nye typer af informationskilder. Spørgsmålet er; hvor nyttig er...

  7. Alzheimer's Project

    Medline Plus

    Full Text Available ... Alzheimer’s Project In the News Walk to End Alzheimer's Upcoming Events AAIC Advocacy Forum Rita Hayworth Gala - New York Rita Hayworth Gala - Chicago National Alzheimer's Gala A Night at Sardi's Alzheimer's Disease Awareness ...

  8. Project Narrative

    Energy Technology Data Exchange (ETDEWEB)

    Driscoll, Mary C. [St. Bonaventure University, St Bonaventure, NY(United States)

    2012-07-12

    The Project Narrative describes how the funds from the DOE grant were used to purchase equipment for the biology, chemistry, physics and mathematics departments. The Narrative also describes how the equipment is being used. There is also a list of the positive outcomes as a result of having the equipment that was purchased with the DOE grant.

  9. Project Baltia

    Index Scriptorium Estoniae

    2007-01-01

    Uus arhitektuuriajakiri "Project Baltia" tutvustab Baltimaade, Soome ja Peterburi regiooni arhitektuuri, linnaehitust ja disaini. Ilmub neli korda aastas inglise- ja venekeelsena. Väljaandja: kirjastus Balticum Peterburis koostöös Amsterdami ja Moskva kirjastusega A-Fond. Peatoimetaja Vladimir Frolov

  10. Alzheimer's Project

    Medline Plus

    Full Text Available | News | Events | Press | Contact 24/7 Helpline: 1.800.272.3900 Find your chapter: search by state Home > News & Events > Upcoming Events > HBO Alzheimer’s Project In the News Walk to End ...

  11. SDN Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories Inc, Pullman, WA (United States)

    2016-12-23

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  12. Projective geometry and projective metrics

    CERN Document Server

    Busemann, Herbert

    2005-01-01

    The basic results and methods of projective and non-Euclidean geometry are indispensable for the geometer, and this book--different in content, methods, and point of view from traditional texts--attempts to emphasize that fact. Results of special theorems are discussed in detail only when they are needed to develop a feeling for the subject or when they illustrate a general method. On the other hand, an unusual amount of space is devoted to the discussion of the fundamental concepts of distance, motion, area, and perpendicularity.Topics include the projective plane, polarities and conic sectio

  13. Norway's historical and projected water balance in TWh

    Science.gov (United States)

    Haddeland, Ingjerd; Holmqvist, Erik

    2015-04-01

    Hydroelectric power production is closely linked to the water cycle, and variations in power production numbers reflect variations in weather. The expected climate changes will influence electricity supply through changes in annual and seasonal inflow of water to hydropower reservoirs. In Norway, more than 95 percent of the electricity production is from hydroelectric plants, and industry linked to hydropower has been an important part of the society for more than a century. Reliable information on historical and future available water resources is hence of crucial importance both for short and long-term planning and adaptation purposes in the hydropower sector. Traditionally, the Multi-area Power-market Simulator (EMPS) is used for modelling hydropower production in Norway. However, due to the models' high level of details and computational demand, this model is only used for historical analyses and a limited number of climate projections. A method has been developed that transfers water fluxes (mm day-1) and states (mm) into energy units (GWh mm-1), based on hydrological modelling of a limited number of catchments representing reservoir inflow to more than 700 hydropower plants in Norway. The advantages of using the conversion factor method, compared to EMPS, are its simplicity and low computational requirements. The main disadvantages are that it does not take into account flood losses and the time lag between inflow and power production. The method is used operationally for weekly and seasonal energy forecasts, and has proven successful at the range of results obtained for reproducing historical hydropower production numbers. In hydropower energy units, mean annual precipitation for the period 1981-2010 is estimated at 154 TWh year-1. On average, 24 TWh year-1 is lost through evapotranspiration, meaning runoff equals 130 TWh year-1. There are large interannual variations, and runoff available for power production ranges from 91 to 165 TWh year-1. The snow pack

  14. DEVELOPMENT OF THE PRIEST RAPIDS TURBINE UPGRADE PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    DeBolt, Donald; Richmond, Marshall C.; Donelson, Richard K.; Strickler, Brad; Weisbeck, Molly

    2015-07-14

    The Priest Rapids Dam is located on the Columbia River and is operated by Public Utility District No. 2 of Grant County, WA (GCPUD). In operation since 1959, GCPUD decided that a major upgrade was necessary. As with other hydroelectric facilities on the Columbia River, improving fish passage at Priest Rapids Dam is of great importance for salmon and steelhead populations in the Pacific Northwest. Consequently, GCPUD established the Priest Rapids Turbine Upgrade Project to extend the life of the units, increase efficiency and power production, and improve fish-passage. The Priest Rapids powerhouse is equipped with 10 vertical Kaplan turbines with runner diameters of 7.21 m operating under net heads varying from 18 m to 27 m. The scope of the project included a design competition involving three turbine manufacturers providing up to two designs for evaluation. Selection of the replacement design was determined by the lowest evaluated price based on model test results conducted at an independent laboratory (Ecole Polytechnique Federale de Lausanne in Lausanne Switzerland) and a biological performance score determined by a newly developed Biological Performance Assessment (BioPA) performed by Pacific Northwest National Laboratory in Richland, WA. In the paper, the hydraulic design challenges are reviewed, in addition to comparisons of designs evaluated during the competitive model test program and biological assessment. The paper also provides a description of the process followed by GCPUD, and how the evaluation criteria influenced the development and the finally selected solution.

  15. PARTNER Project

    CERN Multimedia

    Ballantine, A; Dixon-Altaber, H; Dosanjh, M; Kuchina, L

    2011-01-01

    Hadrontherapy uses particle beams to treat tumours located near critical organs and tumours that respond poorly to conventional radiation therapy. It has become evident that there is an emerging need for reinforcing research in hadrontherapy and it is essential to train professionals in this rapidly developing field. PARTNER is a 4-year Marie Curie Training project funded by the European Commission with 5.6 million Euros aimed at the creation of the next generation of experts. Ten academic institutes and research centres and two leading companies are participating in PARTNER, that is coordinated by CERN, forming a unique multidisciplinary and multinational European network. The project offers research and training opportunities to 25 young biologists, engineers, physicians and physicists and is allowing them to actively develop modern techniques for treating cancer in close collaboration with leading European Institutions. For this purpose PARTNER relies on cutting edge research and technology development, ef...

  16. Projection Methods

    DEFF Research Database (Denmark)

    Wagner, Falko Jens; Poulsen, Mikael Zebbelin

    1999-01-01

    When trying to solve a DAE problem of high index with more traditional methods, it often causes instability in some of the variables, and finally leads to breakdown of convergence and integration of the solution. This is nicely shown in [ESF98, p. 152 ff.].This chapter will introduce projection...... methods as a way of handling these special problems. It is assumed that we have methods for solving normal ODE systems and index-1 systems....

  17. PROJECT MANAGEMENT AND THE PROJECT MANAGER: A ...

    African Journals Online (AJOL)

    importance of proper planning and monitoring of project activities in order to avoid building and infrastructural collapse, project failure, project abandonment, project cost and time overruns, etc. The paper examines the different component parts that constitute project management in the building construction industry.

  18. Development of a more fish-tolerant turbine runner, advanced hydropower turbine project

    Energy Technology Data Exchange (ETDEWEB)

    Cook, T.C.; Hecker, G.E. [Worcester Polytechnic Inst., Holden, MA (United States). Alden Research Lab.; Faulkner, H.B.; Jansen, W. [Northern Research and Engineering Corp., Woburn, MA (United States)

    1997-02-01

    Alden Research Laboratory, Inc. (ARL) and Northern Research and Engineering Corporation (NREC) conducted a research program to develop a turbine runner which will minimize fish injury and mortality at hydroelectric projects. ARL?NREC have developed a runner shape which minimizes the number of blade leading edges, reduces the pressure versus time and the velocity versus distance gradients within the runner, minimizes or eliminates the clearance between the runner and runner housing, and maximizes the size of the flow passages, all with minimal penalty on turbine efficiency. An existing pump impeller provided the starting point for developing the fish tolerant turbine runner. The Hidrostal pump is a single bladed combined screw/centrifugal pump which has been proven to transport fish with minimal injury. The focus of the ARL/NREC research project was to develop a new runner geometry which is effective in downstream fish passage and hydroelectric power generation. A flow of 1,000 cfs and a head in the range of 75 ft to 100 ft were selected for conceptual design of the new runner. Conceptual design of the new runner began with a re-evaluation of studies which have been previously conducted to identify probable sources of injury to fish passing through hydraulic turbines. Criteria relative to hydraulic characteristics which are favorable for fish passage were prepared based on a reassessment of the available information. Important criteria used to develop the new runner design included low pressure change rates, minimum absolute pressures, and minimum shear. Other criteria which are reflected in the runner design are a minimum number of blades (only two), minimum total length of leading edges, and large flow passages. 86 figs., 5 tabs.

  19. Projective mapping

    DEFF Research Database (Denmark)

    Dehlholm, Christian; Brockhoff, Per B.; Bredie, Wender Laurentius Petrus

    2012-01-01

    instructions and influence heavily the product placements and the descriptive vocabulary (Dehlholm et.al., 2012b). The type of assessors performing the method influences results with an extra aspect in Projective Mapping compared to more analytical tests, as the given spontaneous perceptions are much dependent...... the applied framework, semantic restrictions, the choice of type of assessors and the validation of product separations. The applied framework concerns the response surface as presented to the assessor in different shapes, e.g. rectangular, square or round. Semantic restrictions are a part of the assessor...

  20. FLORAM project

    Energy Technology Data Exchange (ETDEWEB)

    Zulauf, W.E. [Sao Paolos Environmental Secretariat, Sao Paolo (Brazil); Goelho, A.S.R. [Riocell, S.A. (Brazil); Saber, A. [IEA-Instituto de Estudos Avancados (Brazil)] [and others

    1995-12-31

    The project FLORAM was formulated at the `Institute for Advanced Studies` of the University of Sao Paulo. It aims at decreasing the level of carbon dioxide in the atmosphere and thus curbing the green-house effect by way of a huge effort of forestation and reforestation. The resulting forests when the trees mature, will be responsible for the absorption of about 6 billion tons of excess carbon. It represents 5 % of the total amount of CO{sub 2} which is in excess in the earth`s atmosphere and represents 5 % of the available continental surfaces which can be forested as well. Therefore, if similar projects are implemented throughout the world, in theory all the exceeding CO{sub 2}, responsible for the `greenhouse effect`, (27 % or 115 billion tons of carbon) would be absorbed. Regarding this fact, there would be a 400 million hectar increase of growing forests. FLORAM in Brazil aims to plant 20.000.000 ha in 2 years at a cost of 20 billion dollars. If it reaches its goals that will mean that Brazil will have reforested an area almost half as big as France. (author)

  1. PORTNUS Project

    Energy Technology Data Exchange (ETDEWEB)

    Loyal, Rebecca E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-07-14

    The objective of the Portunus Project is to create large, automated offshore ports that will the pace and scale of international trade. Additionally, these ports would increase the number of U.S. domestic trade vessels needed, as the imported goods would need to be transported from these offshore platforms to land-based ports such as Boston, Los Angeles, and Newark. Currently, domestic trade in the United States can only be conducted by vessels that abide by the Merchant Marine Act of 1920 – also referred to as the Jones Act. The Jones Act stipulates that vessels involved in domestic trade must be U.S. owned, U.S. built, and manned by a crew made up of U.S. citizens. The Portunus Project would increase the number of Jones Act vessels needed, which raises an interesting economic concern. Are Jones Act ships more expensive to operate than foreign vessels? Would it be more economically efficient to modify the Jones Act and allow vessels manned by foreign crews to engage in U.S. domestic trade? While opposition to altering the Jones Act is strong, it is important to consider the possibility that ship-owners who employ foreign crews will lobby for the chance to enter a growing domestic trade market. Their success would mean potential job loss for thousands of Americans currently employed in maritime trade.

  2. Yakima Fisheries Project : Revised Draft Environmental Impact Statement, Summary.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes and Bands of the Yakama Nation, Washington; Washington (State). Dept. of Fish and Wildlife.

    1995-05-01

    The Bonneville Power Administration (BPA) proposes to fund the Yakima Fisheries Project (YFP) to undertake fishery research and enhancement activities in the Yakima River Basin. The State of Washington and the Yakima Indian Nation would jointly direct the project. The Yakima River system is a promising location for mitigation and enhancement to compensate for stock losses from development and operation of hydroelectric projects elsewhere in the Columbia Basin. The YFP would help determine the role that supplementation might play in increasing natural production of anadromous salmonids throughout the Columbia Basin. In cooperation with BPA, the project managers propose to construct, operate and maintain anadromous (e.g. salmon) fish production facilities. The goal is to conduct research activities designed to increase knowledge of supplementation techniques. These techniques would be applied to rebuild naturally spawning anadromous fish stocks historically present in the Yakima River Basin and, ultimately, those throughout the Columbia River Basin. Eventually, the YFP might involve the supplementation of all stocks of anadromous fish known to have occurred in the Yakima Basin. However, at this time only two alternatives have been proposed: Alternative 1 would supplement depressed naturally spawning populations of upper Yakima spring chinook salmon; Alternative 2 (preferred) would include all actions under Alternative 1; it would also add a study to determine the feasibility of re-establishing a naturally spawning population and a significant fall fishery for coho salmon in the Yakima Basin. (Coho smolts are currently being imported from another basin under the Columbia River Basin Fish Management Plan; the stock is now virtually eliminated from the Basin.)

  3. Wolf and barren ground caribou relationship, headwaters of the Gulkana and Susitna Rivers

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The caribou population in the area south of the Alaska Range, extending north and east to the Wrangell Mountains and embracing sane 9, 000 square miles of varying...

  4. DIGITAL FLOOD INSURANCE RATE MAP DATABASE, MATANUSKA-SUSITNA BOROUGH, AK, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — The Digital Flood Insurance Rate Map (DFIRM) Database depicts flood risk information and supporting data used to develop the risk data. The primary risk...

  5. Technological characterization of basaltic rocks of Canoas I Hydroelectric Power Plant, Paranapanema river, Sao Paulo - Parana states, Brazil; Caracterizacao tecnologica das rochas basalticas da Usina Hidroeletrica Canoas I, Rio Paranapanema, SP/PR

    Energy Technology Data Exchange (ETDEWEB)

    Marrano, Antonio

    1997-07-01

    Basaltic litotypes from the rock mass foundation of Canoas I Hydroelectric Power Plant were submitted to technological characterization tests, in order to verify their suitability as construction material. Physical and mechanical properties (density, porosity, water absorption, ultrasonic velocity, compressive and splitting tensile strength, among others) were determined, besides petrographic analyses. Weather ability tests were also performed, not only through wetting-drying cycles and by immersion in ethylene glycol but by outdoor exposure as well, using crushed and core drilled specimens. Detailed procedures for the weather ability test using core specimens from rotary drilling are given. It is analyzed the influence of a geological feature (fault zone, about 10 meters thick and 20 degrees dip), that occurs in the rock mass foundation, on the technological properties of these rocks. Basaltic litotypes selected as construction material are then pointed out. (author)

  6. The Mansonia genus (diptera: culicidae) and mosquitoes growing in Tucurui hydroelectric power plant (Para - Brazil); O genero Mansonia (diptera: culicidae) e a proliferacao de mosquitos na Usina Hidreletrica de Tucurui

    Energy Technology Data Exchange (ETDEWEB)

    Radei, Wanderli Pedro [Instituto Nacional de Pesquisas da Amazonia (INPA), Manaus, AM (Brazil)

    1996-12-31

    Dams formed for hydroelectric generation normally are invaded by some kinds of aquatic plants. This plants besides the problems in navigation are also responsible for the growing of some mosquitoes. In Tucuri`s dam this plants appeared in so large quantity and make appear mosquitoes and others insects. In this study many captures were making in various places, identifying the mosquitoes and quantifying them from hour to hour. Some considerations were made about the characteristics of this mosquitoes. In conclusion the study shows that the growing of mosquito`s population can cause the appearing of epidemics not knowledge at this places with the population not prepared for them 11 refs., 6 figs., 1 tab.

  7. Sympathetic interaction among 13.2/400 kV step up voltage transformers of the Macagua EDELCA hydroelectric complex; Interaccion simpatica entre transformadores elevadores de 13,2/400 kV del Complejo Hidroelectrico Macagua de EDELCA

    Energy Technology Data Exchange (ETDEWEB)

    Villa R, Alessandro [C.V.G. Electrification del Caroni, C.A. (EDELCA), Caracas (Venezuela). Div. de Ingenieria de Sistemas Electricos]. E-mail: avilla@edelca.com.ve

    2001-07-01

    This work analyses the sympathetic interaction phenomenon among the 13.2/400 kV step-up transformers of the Machine House 2 of the Macagua Hydroelectric Complex. The analysis determined, through simulations with ATP, the magnitudes of the energization currents, the harmonic contents and the effect of using pre insertion resistances at the 400 kV switches for the diminishing of the magnitudes and their decay time. The obtained results indicated that the sympathetic interactions among the step-up transformers influenced on the magnitude, duration and harmonic contents of the energization currents besides the using of pre insertion resistances affects the initial magnitude and duration of the mentioned currents, presenting however a lesser impact in the harmonic content.

  8. Assessment of spermatogenesis and plasma sex steroids in a seasonal breeding teleost: a comparative study in an area of influence of a tributary, downstream from a hydroelectric power dam, Brazil.

    Science.gov (United States)

    Domingos, Fabricio F T; Thomé, Ralph G; Arantes, Fabio P; Castro, Antonio Carlos S; Sato, Yoshimi; Bazzoli, Nilo; Rizzo, Elizete

    2012-12-01

    River damming and building of hydroelectric power plants interrupt the reproductive migration routes and change the major physicochemical parameters of water quality, with drastic consequences for populations of migratory fishes. The goal of this study was to evaluate proliferation and cell death during spermatogenesis and serum profiles of sex steroids in Prochilodus argenteus, from the São Francisco River, downstream from the Três Marias Dam. A total of 257 adult males were caught quarterly during a reproductive cycle in two sites: the first 34 km of the river after the dam (site 1) and the second 34-54 km after the dam (site 2), after the confluence with a tributary, the Abaeté River. Seasonal changes in the testicular activity associated with morphometric analyses of germ cells as well as proliferation and testicular apoptosis support a more active spermatogenesis in fish from site 2, where higher levels of sex steroids and gonadosomatic index (GSI) were also found. In site 1, fish presented low serum levels of testosterone, 17β-estradiol and 17α-hydroxyprogesterone and a low GSI during gonadal maturation. Spermatogonial proliferation (PCNA) and apoptosis (TUNEL) were more elevated in fish from site 1, but spermatocytes were mainly labelled in fish from site 2. Overall, these data demonstrate changes in testicular activity and plasma sex steroids in a neotropical teleost fish living downstream from a hydroelectric dam, supplying new data on fish reproduction in regulated rivers. Moreover, morphometric analyses associated with sex steroids profiles provide reliable tools to assess fish spermatogenesis under environmental stress conditions.

  9. Change in runoff characteristics of alpine flowing waters caused by the use of hydroelectric power and its effects on the macro-benthos. Das durch Wasserkraftnutzung veraenderte Abflussregime eines alpinen Fliessgewaessers und dessen Auswirkungen auf das Makrobenthos

    Energy Technology Data Exchange (ETDEWEB)

    Ammann, M.

    1993-01-01

    A typical form of change in runoff characteristics caused by the widespread use of hydroelectric power in Switzerland is the intermittent draining (torrent operation). It is the aim of the present work to help elucidate possible consequences of these changes in drain onto the benthobiocoenosis. The study was carried through on the Secklisbach at Oberrickenbach (in the semicanton of Nidwalden) and one of its side streamlets (800m above sea level). The macroinvertebrate coenosis was studied at four locations with similar conditions of drainage basin, population density and topography but varying in the degree of impairment to the draining. There were monthly benthos samples taken using a Surber sampling-device. Results show that the locations not only varied in drain, but also in temperature, this being a consequence of water storage by the power plant. The readings pointed out different values for the locations in daily average temperature, day amplitudes and half-yearly temperature sums. The annual average temperatures, however, did hardly differ. With the water, there is warmth being held back as well in the storage basin in summer, which in winter flows off with the process water. The hydroelectric operation with water storage leads to an intermittent drain with ecological consequences. In order to preserve a stretch of water as a biotope for the naturally found lotic organisms a constant minimum drain has to be guaranteed all year long. In order to avoid clogging, the interstitium has to be cleaned regularly by flooding drains. However, the possibility of changes in the development of organisms cannot be excluded, even though they have not been established. (author) figs., tabs., refs.

  10. ENVISION Project

    CERN Multimedia

    Ballantine, A; Dixon-Altaber, H; Dosanjh, M; Kuchina, L

    2011-01-01

    Hadrontherapy is a highly advanced technique of cancer radiotherapy that uses beams of charged particles (ions) to destroy tumour cells. While conventional X-rays traverse the human body depositing radiation as they pass through, ions deliver most of their energy at one point. Hadrontherapy is most advantageous once the position of the tumour is accurately known, so that healthy tissues can be protected. Accurate positioning is a crucial challenge for targeting moving organs, as in lung cancer, and for adapting the irradiation as the tumour shrinks with treatment. Therefore, quality assurance becomes one of the most relevant issues for an effective outcome of the cancer treatment. In order to improve the quality assurance tools for hadrontherapy, the European Commission is funding ENVISION, a 4-year project that aims at developing solutions for: real-• time non invasive monitoring • quantitative imaging • precise determination of delivered dose • fast feedback for optimal treatment planning • real-t...

  11. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  12. The Ethiopian Flora Project

    DEFF Research Database (Denmark)

    Demissew, Sebsebe; Brochmann, Christian; Kelbessa, Ensermu

    2011-01-01

    The account reviews and analyses the scietific projects derived from activities in connection with the Ethiopian Flora Project, including the [Ethiopian] Monocot Project, the Afro-alpine "Sky-island" project, the Vegetation and Ecological Conditions of Plantations Project, the Fire Ecology Project......, the Aromatic Plants Project, RAPSUD, the Medicinal Plants Project, the Ethnobotany Project, as well as the project of producing an atlas of the potential natural vegetation of Ethiopia. The projects have resulted in many publications and a significant number of graduate students at MSc- and PHd-levels. After...

  13. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  14. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  15. Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    McGowan, Vance R.; Powell, Russ M.; Stennfeld, Scott P.

    2001-04-01

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of ''The Grande Ronde Basin Fish Habitat Enhancement Project'' is to access, create, improve, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian enclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2000 included: (1) Implementing 2 new projects in the Grande Ronde drainage, and retrofitting one old

  16. Pacific Lamprey Research and Restoration Project, Annual Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Close, David; Aronsuu, Kimmo; Jackson, Aaron

    2003-07-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993, Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers (Moser et al. 2002), thus effecting larval recruitment in the basin (Moser and Close in press). Adult Pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River (Close and Jackson 2001). In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River (Close 1999). To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2002.

  17. High-resolution projections of surface water availability for Tasmania, Australia

    Directory of Open Access Journals (Sweden)

    J. C. Bennett

    2012-05-01

    Full Text Available Changes to streamflows caused by climate change may have major impacts on the management of water for hydro-electricity generation and agriculture in Tasmania, Australia. We describe changes to Tasmanian surface water availability from 1961–1990 to 2070–2099 using high-resolution simulations. Six fine-scale (∼10 km2 simulations of daily rainfall and potential evapotranspiration are generated with the CSIRO Conformal Cubic Atmospheric Model (CCAM, a variable-resolution regional climate model (RCM. These variables are bias-corrected with quantile mapping and used as direct inputs to the hydrological models AWBM, IHACRES, Sacramento, SIMHYD and SMAR-G to project streamflows.

    The performance of the hydrological models is assessed against 86 streamflow gauges across Tasmania. The SIMHYD model is the least biased (median bias = −3% while IHACRES has the largest bias (median bias = −22%. We find the hydrological models that best simulate observed streamflows produce similar streamflow projections.

    There is much greater variation in projections between RCM simulations than between hydrological models. Marked decreases of up to 30% are projected for annual runoff in central Tasmania, while runoff is generally projected to increase in the east. Daily streamflow variability is projected to increase for most of Tasmania, consistent with increases in rainfall intensity. Inter-annual variability of streamflows is projected to increase across most of Tasmania.

    This is the first major Australian study to use high-resolution bias-corrected rainfall and potential evapotranspiration projections as direct inputs to hydrological models. Our study shows that these simulations are capable of producing realistic streamflows, allowing for increased confidence in assessing future changes to surface water variability.

  18. Development of a more fish tolerant turbine runner advanced hydropower turbine project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Cook, T.C.; Hecker, G.E. [Worcester Polytechnic Inst., Holden, MA (United States). Alden Research Lab.; Faulkner, H.B.; Jansen, W. [Northern Research and Engineering Corp., Cambridge, MA (United States)

    1997-01-01

    The Hidrostal pump is a single bladed combined screw/centrifugal pump which has been proven to transport fish with minimal injury. The focus of the ARL/NREC research project was to develop a new runner geometry which is effective in downstream fish passage and hydroelectric power generation. A flow of 1,000 cfs and a head in the range of 75 ft to 100 ft were selected for conceptual design of the new runner. Criteria relative to hydraulic characteristics which are favorable for fish passage were prepared based on a reassessment of the available information. Important criteria used to develop the new runner design included low pressure change rates, minimum absolute pressures, and minimum shear. Other criteria which are reflected in the runner design are a minimum number of blades (only two), minimum total length of leading edges, and large flow passages. Flow characteristics of the new runner were analyzed using two- dimensional and three-dimensional Computational Fluid Dynamic (CFD) models. The basic runner geometry was initially selected using the two-dimensional model. The three-dimensional model was used to investigate the flow characteristics in detail through the entire runner and to refine the design by eliminating potential problem areas at the leading and trailing edges. Results of the analyses indicated that the runner has characteristics which should provide safe fish passage with an overall power efficiency of approximately 90%. The size of the new runner, which is larger than conventional turbine runners with the same design flow and head, will provide engineering, fabrication, and installation.challenges related to the turbine components and the civil works. A small reduction in the overall efficiency would reduce the size of the runner considerably, would simplify the turbine manufacturing operations, and would allow installation of the new turbine at more hydroelectric sites.

  19. Methodologies for Assessing the Cumulative Environmental Effects of Hydroelectric Development of Fish and Wildlife in the Columbia River Basin, Volume 1, Recommendations, 1987 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Stull, Elizabeth Ann

    1987-07-01

    This volume is the first of a two-part set addressing methods for assessing the cumulative effects of hydropower development on fish and wildlife in the Columbia River Basin. Species and habitats potentially affected by cumulative impacts are identified for the basin, and the most significant effects of hydropower development are presented. Then, current methods for measuring and assessing single-project effects are reviewed, followed by a review of methodologies with potential for use in assessing the cumulative effects associated with multiple projects. Finally, two new approaches for cumulative effects assessment are discussed in detail. Overall, this report identifies and reviews the concepts, factors, and methods necessary for understanding and conducting a cumulative effects assessment in the Columbia River Basin. Volume 2 will present a detailed procedural handbook for performing a cumulative assessment using the integrated tabular methodology introduced in this volume. 308 refs., 18 figs., 10 tabs.

  20. RESOLVE Project

    Science.gov (United States)

    Parker, Ray O.

    2012-01-01

    The RESOLVE project is a lunar prospecting mission whose primary goal is to characterize water and other volatiles in lunar regolith. The Lunar Advanced Volatiles Analysis (LAVA) subsystem is comprised of a fluid subsystem that transports flow to the gas chromatograph- mass spectrometer (GC-MS) instruments that characterize volatiles and the Water Droplet Demonstration (WDD) that will capture and display water condensation in the gas stream. The LAVA Engineering Test Unit (ETU) is undergoing risk reduction testing this summer and fall within a vacuum chamber to understand and characterize C!Jmponent and integrated system performance. Ray will be assisting with component testing of line heaters, printed circuit heaters, pressure transducers, temperature sensors, regulators, and valves in atmospheric and vacuum environments. He will be developing procedures to guide these tests and test reports to analyze and draw conclusions from the data. In addition, he will gain experience with preparing a vacuum chamber with fluid and electrical connections. Further testing will include integrated testing of the fluid subsystem with the gas supply system, near-infrared spectrometer, WDD, Sample Delivery System, and GC-MS in the vacuum chamber. This testing will provide hands-on exposure to a flight forward spaceflight subsystem, the processes associated with testing equipment in a vacuum chamber, and experience working in a laboratory setting. Examples of specific analysis Ray will conduct include: pneumatic analysis to calculate the WOO's efficiency at extracting water vapor from the gas stream to form condensation; thermal analysis of the conduction and radiation along a line connecting two thermal masses; and proportional-integral-derivative (PID) heater control analysis. In this Research and Technology environment, Ray will be asked to problem solve real-time as issues arise. Since LAVA is a scientific subsystem, Ray will be utilizing his chemical engineering background to

  1. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  2. Storytelling in Projects

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas; Andersen, Peter Bøgh

    2006-01-01

    Plans and stories are two different ways of communicating about projects. Project plans are formalized descriptions, primarily supporting coordination. Project stories are accounts whose primary function is emotional appeal. Project stories influence the projects’ chances of success. Therefore...... project managers should not only be concerned with project plans, but also with project stories. In this paper we explore some basic principles for transforming project plans into appealing stories. We discuss what may happen to stories once they are released into public space. And we illustrate how...... the possibilities of telling favorable stories may have repercussions on the project planning....

  3. Capital projects coordination

    Directory of Open Access Journals (Sweden)

    Zubović Jovan

    2004-01-01

    Full Text Available This paper looks at the difficulties of managing modem capital projects and endeavors to reduce the complexities to simpler and more understandable terms. It examines the project environment, defines project management and discusses points of difference from traditional management. In the second part of the paper are presented fundamentals for project success for different types of projects.

  4. Integrated Project Management System description. [UMTRAP Project

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office ( Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs.

  5. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  6. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  7. Project Panama: An International Service Project

    Science.gov (United States)

    Aydlett, Lydia; Randolph, Mickey; Wells, Gayle

    2010-01-01

    Participation in service learning projects is a growing phenomenon at universities and colleges. Research indicates service projects are beneficial for college students and adults. There is little data investigating developmental differences in how younger versus older participants perceive the service learning process. In this project, older…

  8. PROJECT MANAGEMENT AND THE PROJECT MANAGER: A ...

    African Journals Online (AJOL)

    Anyanwu, C. I.. Department of Project Management Technology. School of Management Technology. Federal University of Technology, PMB 1526, Owerri. Abstract. This study was undertaken to establish how project management and the project manager can be used as a panacea for preventing building and.

  9. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  10. Passage and behavior of radio-tagged adult Pacific lampreys (Entosphenus tridentatus) at the Willamette Falls Project, Oregon.

    Science.gov (United States)

    Mesa, Matthew G.; Magie, Robert J.; Copeland, Elizabeth S.

    2010-01-01

    Populations of Pacific lamprey (Entosphenus tridentatus) in the Columbia River basin have declined and passage problems at dams are a contributing factor. We used radio telemetry to monitor the passage of adult Pacific lampreys at the Willamette Falls Project (a hydroelectric dam integrated into a natural falls) on the Willamette River near Portland, Oregon. In 2005 and 2006, fish were captured at the Project, implanted with a radio tag, and released downstream. We tagged 136 lampreys in 2005 and 107 in 2006. Over 90% of the fish returned to the Project in 7 – 9 h and most were detected from 2000 – 2300 h. In 2005, 43 fish (34%) passed the dam via the fishway, with peak passage in August. No fish passed over the falls, but 13% ascended at least partway up the falls. In 2006, 24 fish (23%) passed the Project using the fishway, with most prior to 9 June when the powerhouse was off. Although 19 lampreys ascended the falls, only two passed via this route. The time for fish to pass through the fishway ranged from 4 – 74 h, depending on route. Many fish stayed in the tailrace for hours to almost a year and eventually moved downstream. Our results indicate that passage of lampreys at the Project is lower than that for lampreys at dams on the Columbia River. Low passage success may result from low river flows, impediments in fishways, delayed tagging effects, changing environmental conditions, or performance or behavioral constraints.

  11. Recuperação em área de empréstimo usada para construção de usina hidrelétrica Recovery of nativa area used for construction of hydroelectric power station

    Directory of Open Access Journals (Sweden)

    Marlene C. Alves

    2012-08-01

    Full Text Available A recuperação de áreas de empréstimo usada para construção de hidrelétricas é um processo lento que requer o uso de plantas de cobertura, como fonte de matéria orgânica e a aplicação de nutrientes e corretivos como condicionadores dos atributos do solo. Portanto, objetivou-se, com este trabalho, estudar a recuperação de atributos físicos do subsolo de um Latossolo Vermelho distrófico, utilizado no terrapleno e fundação da Usina Hidrelétrica de Ilha Solteira, SP. O delineamento utilizado foi em blocos casualizados com oito tratamentos e quatro repetições. A pesquisa foi implantada em 1992. Os tratamentos se constituíram do uso de adubos verdes, braquiária e correção do solo. Após 13 anos foram avaliados: porosidade total do solo, macroporosidade, microporosidade, densidade do solo, estabilidade de agregados, resistência do solo à penetração, teor de matéria orgânica e produção de matéria seca da braquiária. Os tratamentos adotados estão recuperando, de forma lenta, os atributos físicos do subsolo exposto. Os efeitos da recuperação do solo estão atingindo a profundidade de 0-0,10 m.The recovery of native area used in hydroelectric power station construction is a slow process, and it requires the use of covering plant as a source of organic matter, application of nutrients and amendments as soil conditioner. Thus, this study has the objective to study the recovery of physical attribute of subsoil in a distrophic Red Latosol, used in the embankment and foundation of Hydroelectric Power Station, Ilha Solteira, São Paulo, Brazil. The design used was randomized blocks with eight treatments and four replications. The research started in 1992. The treatments consisted of green manure, pasture and soil amendment. After 13 years, total porosity, macroporosity, microporosity, bulk density, aggregate stability, resistance to penetration, organic matter of soil and dry matter of pasture production were evaluated. The

  12. Impacts of China's Three Gorges Dam Project on net primary productivity in the reservoir area.

    Science.gov (United States)

    Xu, Xibao; Tan, Yan; Yang, Guishan; Li, Hengpeng; Su, Weizhong

    2011-10-15

    China's Three Gorges Dam Project (TGP) is the world's largest hydroelectric power project, and as a consequence the reservoir area is at risk of ecological degradation. This study uses net primary productivity (NPP) as an important indicator of the reservoir ecosystem's productivity to estimate the impacts of the TGP in the local resettlement region of the Three Gorges Reservoir Area (TGRA) over the 2000-2010 period. The modeling method is based upon the Carnegie Ames Stanford Approach (CASA) terrestrial carbon model and uses Moderate Resolution Imaging Spectroradiometer (MODIS) remote sensing data for modeling simulation. The results demonstrate that total NPP in the resettlement region decreased by 8.0% (632.8Gg) from 2000 to 2010. The impact of the TGP on NPP is mainly mediated by land-use change brought about by the large-scale inundation of land and subsequent massive resettlement of both rural and urban residents. Nearby resettlement, land inundation, and relocation of old urban centers and affiliated urban dwellers are responsible for 54.3%, 28.0%, and 5.8% respectively of total NPP reduction in the resettlement region over the study period. The major national ecological projects implemented in the TGRA since 1998 have played a key role in offsetting the negative impacts of the TGP on NPP in the region. Copyright © 2011 Elsevier B.V. All rights reserved.

  13. Information technology project management

    National Research Council Canada - National Science Library

    Schwalbe, Kathy

    2014-01-01

    ... (IT) projects that extend well beyond standard project management requirements. No book offers more up-to-the minute insights and software tools for IT project management success, including updates that reflect the latest PMBOK...

  14. Evaluation of environmental impact caused by the implementation of small hydroelectric power plants: a study concerning biotic aspects, water quality and public health; Avaliacao de impacto ambiental ocasionado pela implantacao de pequenos aproveitamentos: um estudo sobre aspectos bioticos, qualidade da agua e saude publica

    Energy Technology Data Exchange (ETDEWEB)

    Carneiro, P.R.F. [Monasa Consultoria e Projetos, Belo Horizonte, MG (Brazil)

    1987-12-31

    This work describes the experience in the environmental impacts evaluation during the implementation phase of small scales hydroelectric power plants in Paraiba River bay, Southeast Brazil, performed by ELETROBRAS, the Brazilian electric power holding company, government owned and controlled. The methodology is described. The main aspects studied were: vegetation; aquatic fauna; terrestrial fauna; water quality, and public health. Results are presented 9 refs., 5 figs.

  15. Feasibility Study of Economics and Performance of a Hydroelectric Installation at the Jeddo Mine Drainage Tunnel. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, J. O.; Mosey, G.

    2013-02-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options that could assist in the implementation of a system.

  16. Feasibility assessment of the water energy resources of the United States for new low power and small hydro classes of hydroelectric plants: Main report and Appendix A

    Energy Technology Data Exchange (ETDEWEB)

    Hall, Douglas G. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Reeves, Kelly S. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Brizzee, Julie [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lee, Randy D. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Carroll, Gregory R. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Sommers, Garold L. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2006-01-01

    Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MWa) or small hydro (between 1 and 30 MWa) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in an appendix. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

  17. Feasibility Assessment of Water Energy Resources of the United States for New Low Power and Small Hydro Classes of Hydroelectric Plants

    Energy Technology Data Exchange (ETDEWEB)

    Douglas G. Hall

    2006-01-01

    Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MW) or small hydro (between 1 and 30 MW) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in an appendix. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

  18. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  19. Project 2010 For Dummies

    CERN Document Server

    Muir, Nancy C

    2010-01-01

    A friendly reference guide to Microsoft Project, the leading enterprise project management software. As project management software, Microsoft Project allows you to oversee your business activities effectively. You can manage resources, share project info, perform modeling and scenario analysis, and standardize reporting processes. This easy-to-understand guide is completely updated to cover the latest changes and newest enhancements to Project 2010 and shows you how to get Project 2010 to work for you. After an introduction to basic project management concepts, you'll discover the mechanics o

  20. USAID Anticorruption Projects Database

    Data.gov (United States)

    US Agency for International Development — The Anticorruption Projects Database (Database) includes information about USAID projects with anticorruption interventions implemented worldwide between 2007 and...