  1. Surry Power Station, Units 1 and 2. Semiannual operating report, July--December 1974

    International Nuclear Information System (INIS)

    1974-01-01

    Net electric power generated by Surry Unit 1 was 6,930,353 MWH with the generator on line for 10,417.7 hours. Net electric power generated by Unit 2 was 5,699,299 MWH with the generator on line for 8,384.2 hours. Information is presented concerning operation, radioactive effluent releases, solid radioactive wastes, fuel shipments, occurrences in which temperature limitations on the condenser cooling water discharge were exceeded, changes in station organization, occupational personnel radiation exposure, nonradiological monitoring including thermal, physical, and biological programs, and the radiological environmental monitoring program. (U.S.)

  2. Surry Power Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Net electric power generated by Unit 1 was 2,315,124 MWH(e) and Unit 2 generated 2,062,954 MWH(e) with Unit 1 generator on line for 3,157.8 hrs and Unit 2 on line for 2,881.2 hrs. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental monitoring. (FS)

  3. Evaluation of severe accident risks and the potential for risk reduction: Surry Power Station, Unit 1: Draft report for comment

    International Nuclear Information System (INIS)

    Benjamin, A.S.; Boyd, G.J.; Kunsman, D.M.; Murfin, W.B.; Williams, D.C.

    1987-02-01

    The Severe Accident Risk Reduction Program (SARRP) has completed a rebaselining of the risks to the public from a particular pressurized water reactor with a subatmospheric containment (Surry, Unit 1). Emphasis was placed on determining the magnitude and character of the uncertainties, rather than focusing on a point estimate. The risk-reduction potential of a set of proposed safety option backfits was also studied, and their costs and benefits were also evaluated. It was found that the risks from internal events are generally lower than previously evaluated in the Reactor Safety Study (RSS). However, certain unresolved issues (such as direct containment heating) caused the top of the uncertainty band to appear at a level that is comparable with the RSS point estimate. None of the postulated safety options appears to be cost effective for the Surry power plant. This work supports the Nuclear Regulatory Commission's assessment of severe accidents in NUREG-1150

  4. Evaluation of severe accident risks and the potential for risk reduction: Surry Power Station, Unit 1: Draft report for comment

    Energy Technology Data Exchange (ETDEWEB)

    Benjamin, A.S.; Boyd, G.J.; Kunsman, D.M.; Murfin, W.B.; Williams, D.C.

    1987-02-01

    The Severe Accident Risk Reduction Program (SARRP) has completed a rebaselining of the risks to the public from a particular pressurized water reactor with a subatmospheric containment (Surry, Unit 1). Emphasis was placed on determining the magnitude and character of the uncertainties, rather than focusing on a point estimate. The risk-reduction potential of a set of proposed safety option backfits was also studied, and their costs and benefits were also evaluated. It was found that the risks from internal events are generally lower than previously evaluated in the Reactor Safety Study (RSS). However, certain unresolved issues (such as direct containment heating) caused the top of the uncertainty band to appear at a level that is comparable with the RSS point estimate. None of the postulated safety options appears to be cost effective for the Surry power plant. This work supports the Nuclear Regulatory Commission's assessment of severe accidents in NUREG-1150.

  5. Steam generator replacement at Surry Power Station

    International Nuclear Information System (INIS)

    McKay, H.S.

    1982-01-01

    The purposes of the steam generator repair program at Surry Power Station were to repair the tube degradation caused by corrosion-related phenomena and to restore the integrity of the steam generators to a level equivalent to new equipment. The repair program consisted of (1) replacing the existing lower-shell assemblies with new ones and (2) adding new moisture separation equipment to the upper-shell assemblies. These tasks required that several pieces of reactor coolant piping, feedwater piping, main steam piping, and the steam generator be cut and refurbished for reinstallation after the new lower shell was in place. The safety implications and other potential effects of the repair program both during the repair work and after the unit was returned to power were part of the design basis of the repair program. The repair program has been completed on Unit 2 without any adverse effects on the health and safety of the general public or to the personnel engaged in the repair work. Before the Unit 1 repair program began, a review of work procedures and field changes for the Unit 2 repair was conducted. Several major changes were made to avoid recurrence of problems and to streamline procedures. Steam generator replacements was completed on June 1, 1981, and the unit is presently in the startup phase of the outrage

  6. A pilot application of risk-based methods to establish in-service inspection priorities for nuclear components at Surry Unit 1 Nuclear Power Station

    International Nuclear Information System (INIS)

    Vo, T.; Gore, B.; Simonen, F.; Doctor, S.

    1994-08-01

    As part of the Nondestructive Evaluation Reliability Program sponsored by the US Nuclear Regulatory Commission, the Pacific Northwest Laboratory is developing a method that uses risk-based approaches to establish in-service inspection plans for nuclear power plant components. This method uses probabilistic risk assessment (PRA) results and Failure Modes and Effects Analysis (FEMA) techniques to identify and prioritize the most risk-important systems and components for inspection. The Surry Nuclear Power Station Unit 1 was selected for pilot applications of this method. The specific systems addressed in this report are the reactor pressure vessel, the reactor coolant, the low-pressure injection, and the auxiliary feedwater. The results provide a risk-based ranking of components within these systems and relate the target risk to target failure probability values for individual components. These results will be used to guide the development of improved inspection plans for nuclear power plants. To develop inspection plans, the acceptable level of risk from structural failure for important systems and components will be apportioned as a small fraction (i.e., 5%) of the total PRA-estimated risk for core damage. This process will determine target (acceptable) risk and target failure probability values for individual components. Inspection requirements will be set at levels to assure that acceptable failure probabilistics are maintained

  7. A pilot application of risk-informed methods to establish inservice inspection priorities for nuclear components at Surry Unit 1 Nuclear Power Station. Revision 1

    International Nuclear Information System (INIS)

    Vo, T.V.; Phan, H.K.; Gore, B.F.; Simonen, F.A.; Doctor, S.R.

    1997-02-01

    As part of the Nondestructive Evaluation Reliability Program sponsored by the US Nuclear Regulatory Commission, the Pacific Northwest National Laboratory has developed risk-informed approaches for inservice inspection plans of nuclear power plants. This method uses probabilistic risk assessment (PRA) results to identify and prioritize the most risk-important components for inspection. The Surry Nuclear Power Station Unit 1 was selected for pilot application of this methodology. This report, which incorporates more recent plant-specific information and improved risk-informed methodology and tools, is Revision 1 of the earlier report (NUREG/CR-6181). The methodology discussed in the original report is no longer current and a preferred methodology is presented in this Revision. This report, NUREG/CR-6181, Rev. 1, therefore supersedes the earlier NUREG/CR-6181 published in August 1994. The specific systems addressed in this report are the auxiliary feedwater, the low-pressure injection, and the reactor coolant systems. The results provide a risk-informed ranking of components within these systems

  8. Solid radwaste characterization at surry and North Anna Power Stations

    International Nuclear Information System (INIS)

    Lippard, D.W.

    1987-01-01

    This paper describes a characterization of the solid radwaste generated at Virginia Power's North Anna and Surry power stations. The primary focus of this characterization was dry active waste (DAW). The characterization, covering the 21-month period from January 1985 through September 1986, was based on information in the station's health physics procurement records, radwaste shipping records, and from interviews with station personnel. The procurement records were the principal source of information for DAW. They were reviewed to determine the quantities of various materials, purchased during the study period, that were expected to become DAW. This provides an upper limit on the quantity in the waste for several major DAW components and a basis for the total amount of other components in the waste. The approach to characterizing DAW discussed in this paper could be implemented and regularly updated by utilizing a computerized procurement records system. If a use code (i.e., contaminated or noncontaminated) is associated with each stock requisition, a characterization could be performed by a computer run. This approach would help track minimization effort effectiveness and would refine the characterization of DAW considerably

  9. Surry Power Station, Units 1 and 2. Annual operating report for 1976, section 2: core performance and startup physics test reports

    International Nuclear Information System (INIS)

    1977-01-01

    The analyses of four core performance indicators including burnup distribution, reactivity depletion, power distribution, and primary coolant activity are discussed. Information is presented concerning fuel densification monitoring; start-up physics testing; and James River temperature, salinity, fish, biota, and plankton entrainment monitoring

  10. Characterization of solid radwaste generated at Virginia Power's Surry and North Anna stations

    International Nuclear Information System (INIS)

    Lippard, D.W.; Elguindy, H.; Nelson, R.A.

    1987-01-01

    This paper describes the results of a study on characterization of the major constituents of the solid radwaste generated at Virginia Power's North Anna and Surry Power Stations. The characterization consisted of identifying the individual constituents of the dry active waste (DAW) and estimating the fraction of the total DAW (both weight and volume) made up by each constituent. The analysis of the characterization of solid waste streams generated at both North Anna and Surry stations has lead to recommending techniques for both source minimization and waste volume reduction

  11. Critical evaluation of the nonradiological environmental technical specifications. Volume 2. Surry Power Plants, Units 1 and 2

    International Nuclear Information System (INIS)

    Adams, S.M.; Cunningham, P.A.; Gray, D.D.; Kumar, K.D.

    1976-01-01

    A comprehensive study of the data collected as part of the environmental Technical Specifications program for Units 1 and 2 of the Surry Nuclear Power Plant was carried out for the Office of Regulatory Research of the U.S. Nuclear Regulatory Commission. The program included an analysis of the hydrothermal and ecological monitoring data collected from 1973 through 1975. The hydrothermal analysis includes a discussion of models used in plume predictions prior to plant operation and an evaluation of the present hydrothermal monitoring program. The two primary methods used for temperature monitoring employ a fixed thermographs network and boat measurements. Review of data indicates that both the application and formulation of the hydrothermal monitoring program are inadequate to fully characterize the operation of the plant and the behavior of the thermal plume. Furthermore, there are no existing data that can be used to adequately verify or disprove the validity of the various Surry plume predictions. The ecological analysis includes validation of impacts predicted in the Final Environmental Statement using the operational monitoring data. Phytoplankton cell concentrations, chlorophyll a, and carbon-14 measurements were used to monitor changes in the primary producers. Densities of consumers (i.e., zooplankton, benthos, and fish) were sed to monitor changes in the primary producers. Models based on operating data were constructed to determine whether changes were occurring at each trophic level. Analysis of the monitoring data suggests that the thermal discharges at Surry are having a negative effect on the phytoplankton and zooplankton but are enhancing the benthic and nekton populations in the discharge area

  12. Analysis of core damage frequency: Surry, Unit 1 internal events

    International Nuclear Information System (INIS)

    Bertucio, R.C.; Julius, J.A.; Cramond, W.R.

    1990-04-01

    This document contains the accident sequence analysis of internally initiated events for the Surry Nuclear Station, Unit 1. This is one of the five plant analyses conducted as part of the NUREG-1150 effort by the Nuclear Regulatory Commission. NUREG-1150 documents the risk of a selected group of nuclear power plants. The work performed and described here is an extensive of that published in November 1986 as NUREG/CR-4450, Volume 3. It addresses comments form numerous reviewers and significant changes to the plant systems and procedures made since the first report. The uncertainty analysis and presentation of results are also much improved. The context and detail of this report are directed toward PRA practitioners who need to know how the work was performed and the details for use in further studies. The mean core damage frequency at Surry was calculated to be 4.05-E-5 per year, with a 95% upper bound of 1.34E-4 and 5% lower bound of 6.8E-6 per year. Station blackout type accidents (loss of all AC power) were the largest contributors to the core damage frequency, accounting for approximately 68% of the total. The next type of dominant contributors were Loss of Coolant Accidents (LOCAs). These sequences account for 15% of core damage frequency. No other type of sequence accounts for more than 10% of core damage frequency. 49 refs., 52 figs., 70 tabs

  13. Analysis of core damage frequency from internal events: Surry, Unit 1

    International Nuclear Information System (INIS)

    Harper, F.T.

    1986-11-01

    This document contains the accident sequence analyses for Surry, Unit 1; one of the reference plants being examined as part of the NUREG-1150 effort by the Nuclear Regulatory Commission (NRC). NUREG-1150 will document the risk of a selected group of nuclear power plants. As part of that work, this report contains the overall core damage frequency estimate for Surry, Unit 1, and the accompanying plant damage state frequencies. Sensitivity and uncertainty analyses provide additional insights regarding the dominant contributors to the Surry core damage frequency estimate. The numerical results are driven to some degree by modeling assumptions and data selection for issues such as reactor coolant pump seal LOCAs, common cause failure probabilities, and plant response to station blackout and loss of electrical bust initiators. The sensitivity studies explore the impact of alternate theories and data on these issues

  14. Development of in-service inspection plans for nuclear components at the Surry 1 nuclear power station

    International Nuclear Information System (INIS)

    Vo, T.V.; Simonen, F.A.; Doctor, S.R.; Smith, B.W.; Gore, B.F.

    1993-01-01

    As part of the nondestructive evaluation reliability program sponsored by the US Nuclear Regulatory Commission at Pacific Northwest Laboratory, a methodology has been developed for establishing in-service inspection priorities of nuclear power plant components. The method uses results of probabilistic risk assessment in conjunction with the techniques of failure modes and effects analysis to identify and prioritize the most risk-important systems and components for inspection at nuclear power plants. Surry nuclear power station unit 1 was selected for demonstrating the methodology. The specific systems selected for analysis were the reactor pressure vessel, the reactor coolant, the low pressure injection including the accumulators, and the auxiliary feedwater. The results provide a risk-based ranking of components that can be used to establish a prioritization of the components and a basis for developing improved in-service inspection plans at nuclear power plants

  15. Evaluation of potential severe accidents during low power and shutdown operations at Surry: Unit 1, Volume 1

    International Nuclear Information System (INIS)

    Chu, T.L.; Pratt, W.T.

    1995-10-01

    This document contains a summarization of the results and insights from the Level 1 accident sequence analyses of internally initiated events, internally initiated fire and flood events, seismically initiated events, and the Level 2/3 risk analysis of internally initiated events (excluding fire and flood) for Surry, Unit 1. The analysis was confined to mid-loop operation, which can occur during three plant operational states (identified as POSs R6 and R10 during a refueling outage, and POS D6 during drained maintenance). The report summarizes the Level 1 information contained in Volumes 2--5 and the Level 2/3 information contained in Volume 6 of NUREG/CR-6144

  16. Evaluation of potential severe accidents during low power and shutdown operations at Surry: Unit 1, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Chu, T.L.; Pratt, W.T. [eds.; Musicki, Z. [Brookhaven National Lab., Upton, NY (United States)

    1995-10-01

    This document contains a summarization of the results and insights from the Level 1 accident sequence analyses of internally initiated events, internally initiated fire and flood events, seismically initiated events, and the Level 2/3 risk analysis of internally initiated events (excluding fire and flood) for Surry, Unit 1. The analysis was confined to mid-loop operation, which can occur during three plant operational states (identified as POSs R6 and R10 during a refueling outage, and POS D6 during drained maintenance). The report summarizes the Level 1 information contained in Volumes 2--5 and the Level 2/3 information contained in Volume 6 of NUREG/CR-6144.

  17. Evaluation of Shoreham Nuclear Power Station, Unit 1 technical specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-08-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Shoreham Nuclear Power Station Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the assumptions of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the Shoreham T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The Shoreham Nuclear Power Station Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  18. Analysis of core damage frequency, Surry, Unit 1 internal events appendices

    International Nuclear Information System (INIS)

    Bertucio, R.C.; Julius, J.A.; Cramond, W.R.

    1990-04-01

    This document contains the appendices for the accident sequence analyses of internally initiated events for the Surry Nuclear Station, Unit 1. This is one of the five plant analyses conducted as part of the NUREG-1150 effort by the Nuclear Regulatory Commission. NUREG-1150 documents the risk of a selected group of nuclear power plants. The work performed is an extensive reanalysis of that published in November 1986 as NUREG/CR-4450, Volume 3. It addresses comments from numerous reviewers and significant changes to the plant systems and procedures made since the first report. The uncertainty analysis and presentation of results are also much improved. The context and detail of this report are directed toward PRA practitioners who need to know how the work was performed and the details for use in further studies. The mean core damage frequency at Surry was calculated to be 4.0E-5 per year, with a 95% upper bound of 1.3E-4 and 5% lower bound of 6.8E-6 per year. Station blackout type accidents (loss of all AC power) were the largest contributors to the core damage frequency, accounting for approximately 68% of the total. The next type of dominant contributors were Loss of Coolant Accidents (LOCAs). These sequences account for 15% of core damage frequency. No other type of sequence accounts for more than 10% of core damage frequency

  19. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1. Volume 5: Analysis of core damage frequency from seismic events during mid-loop operations

    International Nuclear Information System (INIS)

    Budnitz, R.J.; Davis, P.R.; Ravindra, M.K.; Tong, W.H.

    1994-08-01

    In 1989 the US Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two parallel projects, one at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1) and the other at Sandia National Laboratories studying a boiling water reactor (Grand Gulf). Both the Brookhaven and Sandia projects have examined only accidents initiated by internal plant faults--so-called ''internal initiators.'' This project, which has explored the likelihood of seismic-initiated core damage accidents during refueling shutdown conditions, is complementary to the internal-initiator analyses at Brookhaven and Sandia. This report covers the seismic analysis at Surry Unit 1. All of the many systems modeling assumptions, component non-seismic failure rates, and human error rates that were used in the internal-initiator study at Surry have been adopted here, so that the results of the two studies can be as comparable as possible. Both the Brookhaven study and this study examine only two shutdown plant operating states (POSs) during refueling outages at Surry, called POS 6 and POS 10, which represent mid-loop operation before and after refueling, respectively. This analysis has been limited to work analogous to a level-1 seismic PRA, in which estimates have been developed for the core-damage frequency from seismic events during POSs 6 and 10. The results of the analysis are that the core-damage frequency of earthquake-initiated accidents during refueling outages in POS 6 and POS 10 is found to be low in absolute terms, less than 10 -6 /year

  20. Station black out of Fukushima Daiichi Nuclear Power Station Unit 1 was not caused by tsunamis

    International Nuclear Information System (INIS)

    Ito, Yoshinori

    2013-01-01

    Station black out (SBO) of Fukushima Daiichi Nuclear Power Station Unit 1 would be concluded to be caused before 15:37 on March 11, 2011 because losses of emergency ac power A system was in 15:36 and ac losses of B system in 15:37 according to the data published by Tokyo Electric Power Co. (TEPCO) in May 10, 2013. Tsunami attacked the site of Fukushima Daiichi Nuclear Power Station passed through the position of wave amplitude meter installed at 1.5 km off the coast after 15:35 and it was also recognized tsunami arrived at the coast of Unit 4 sea side area around in 15:37 judging from a series of photographs taken from the south side of the site and general knowledge of wave propagation. From a series of photographs and witness testimony, tsunami didn't attack Fukushima Daiichi Nuclear Power Station uniformly and tsunami's arrival time at the site of Unit 1 would be far later than arrival time at the coast of Unit 4 sea side area, which suggested it would be around in 15:39. TEPCO insisted tsunami passed through 1.5 km off the coast around in 15:33 and clock of wave amplitude meter was incorrect, which might be wrong. Thus SBO of Fukushima Daiichi Nuclear Power Station Unit 1 occurred before tsunami's arrival at the site of Unit 1 and was not caused by tsunami. (T. Tanaka)

  1. Results and insights of internal fire and internal flood analyses of the Surry Unit 1 Nuclear Power Plant during mid-loop operations

    International Nuclear Information System (INIS)

    Chu, Tsong-Lun; Musicki, Z.; Kohut, P.

    1995-01-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). The objectives of the program are to assess the risks of severe accidents initiated during plant operational states (POSs) other than full power operation and to compare the estimated core damage frequencies (CDFs), important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a Level 3 PRA for internal events and a Level 1 PRA for seismically induced and internal fire and flood induced core damage sequences. This paper summarizes the results and highlights of the internal fire and flood analysis documented in Volumes 3 and 4 of NUREG/CR-6144 performed for the Surry plant during mid-loop operation

  2. Accident analysis of Fukushima Daiichi Nuclear Power Station unit 1

    International Nuclear Information System (INIS)

    Kobayashi, Masahide; Narabayashi, Tadashi; Tsuji, Masashi; Chiba, Go; Nagata, Yasunori; Shimoe, Tomohiro

    2015-01-01

    As a result of the Great East Japan Earthquake that occurred on 11 March 2011, all AC and DC power at the Fukushima Daiichi NPP units 1 to 3 were lost soon after the tsunami. The core cooling function was lost, and the cores of units 1 to 3 were damaged. The purpose of this work is to clarify the progress of the accident in unit 1, which was damaged the earliest among the 3 units. Therefore, an original severe accident analysis code was developed, and the progress of the accident was evaluated from the analysis results and the actual data. As a result, the leakage path from a pressure vessel was clarified, and some lessons and knowledge were gained. (author)

  3. Surry Power Station secondary water chemistry improvement since steam generator replacement and the unit two feedwater pipe rupture

    International Nuclear Information System (INIS)

    Swindell, E.T.

    1988-01-01

    Surry Power Station has two Westinghouse-designed three-loop PWRs of 811 MWe design rating. The start of commercial operation was in July, 1972 in No.1 plant, and May, 1973 in No.2 plant. Both plants began the operation using controlled phosphate chemistry for the steam generators. In 1975, both plants were converted to all volatile treatment on the secondary side due to the tube wall thinning corrosion in the steam generators, which was associated with the phosphate sludge that was building up on the tube sheets and created acidic condition. Thereafter, condenser and air leakage and steam generator denting occurred, and after the operation of 8 years 2 month of No.1 plant and 5 years 9 months of No.2 plant, the steam generators were replaced. A major plant improvement program was designed and implemented from 1979 to 1980. The improvement in new steam generators, the modification for preventing corrosion, the addition of a steam generator blowdown recovery system, the reconstruction of condensers, the installation of full flow, deep bed condensate polishers, the addition of Dionex 8,000 on-line ion chromatograph, a long term maintenance agreement with Westinghouse and so on are reported. (Kako, I.)

  4. 75 FR 80546 - Virginia Electric and Power Company; Surry Power Station Unit Nos. 1 and 2; Exemption

    Science.gov (United States)

    2010-12-22

    ... approved the use of Optimized ZIRLO TM as a fuel cladding material based on: (1) Similarities with standard... fuel rod cladding material at SURRY. This change to the plant configuration has no relation to security... granting of this exemption will not have a significant effect on the quality of the human environment as...

  5. Pilgrim Nuclear Power Station, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 2,587,248 MWH(e) with the reactor on line 6,242.4 hr. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, and reportable occurrences

  6. Pilgrim Nuclear Power Station, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electric power generated in 1975 was 1,074,401 MW(e) with the generator on line 4,680.7 hrs. Information is presented concerning operations, maintenance, radioactive effluents and waste shipments, health physics, shutdowns, and personnel exposures

  7. 76 FR 58844 - Virginia Electric and Power Company, Surry Power Station, Units 1 and 2; Exemption

    Science.gov (United States)

    2011-09-22

    ... effectively addressed through staff augmentation that can only be practically achieved through the use of work... quality of the human environment published in the Federal Register on August 31, 2011 (76 FR 54259). This...

  8. Surry Power Station, Units 1 and 2. Annual operating report for 1976, section 3: environmental data

    International Nuclear Information System (INIS)

    1977-01-01

    Thermal plume entrainment studies indicate little or no entrainment of fish or fish eggs by the plume. Number of individuals and number of species were highest in early summer and declined in late summer and fall. Many fish remain in this vicinity for extended periods because the area is a nursery ground

  9. 78 FR 46616 - Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2; Surry Power Station...

    Science.gov (United States)

    2013-08-01

    ... Nuclear Energy Institute (NEI) 99-01, Methodology for Development of Emergency Action Levels.'' The... readily accessible means available in the Control Room. Environmental Impacts of the Proposed Action The... that there are no significant environmental impacts associated with the proposed action. Environmental...

  10. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices A--D. Volume 2, Part 2

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the Potential risks during low Power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the Plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful. This document, Volume 2, Pt. 2 provides appendices A through D of this report

  11. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Main report (Chapters 7--12). Volume 2, Part 1B

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specific shutdown accidents would be useful

  12. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal fires during mid-loop operations. Volume 3, Part 1, Main report

    International Nuclear Information System (INIS)

    Musicki, Z.; Chu, T.L.; Yang, J.; Ho, V.; Hou, Y.M.; Lin, J.; Siu, N.

    1994-07-01

    During l989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than fun power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in ' the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few. procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful

  13. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices E (Sections E.1--E.8). Volume 2, Part 3A

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. The authors recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful

  14. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Main report (Chapters 1--6). Volume 2, Part 1A

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1992-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown written specifically for shutdown accidents would be useful. This document presents Chapters 1--6 of the report

  15. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices A--D. Volume 2, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    Chu, T.L.; Musicki, Z.; Kohut, P. [Brookhaven National Lab., Upton, NY (United States)] [and others

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the Potential risks during low Power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the Plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful. This document, Volume 2, Pt. 2 provides appendices A through D of this report.

  16. 76 FR 72007 - ZionSolutions, LLC; Zion Nuclear Power Station, Units 1 and 2; Exemption From Certain Security...

    Science.gov (United States)

    2011-11-21

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-295 and 50-304; NRC-2011-0244] ZionSolutions, LLC; Zion Nuclear Power Station, Units 1 and 2; Exemption From Certain Security Requirements 1.0 Background Zion Nuclear Power Station (ZNPS or Zion), Unit 1, is a Westinghouse 3250 MWt Pressurized Water Reactor...

  17. North Anna Power Station - Unit 1: Overview of steam generator replacement project activities

    International Nuclear Information System (INIS)

    Gettler, M.W.; Bayer, R.K.; Lippard, D.W.

    1993-01-01

    The original steam generators at Virginia Electric and Power Company's (Virginia Power) North Anna Power Station (NAPS) Unit 1 have experienced corrosion-related degradation that require periodic inspection and plugging of steam generator tubes to ensure their continued safe and reliable operation. Despite improvements in secondary water chemistry, continued tube degradation in the steam generators necessitated the removal from service of approximately 20.3 percent of the tubes by plugging, (18.6, 17.3, and 25.1 for steam generators A, B, and C, respectively). Additionally, the unit power was limited to 95 % during, its last cycle of operation. Projections of industry and Virginia Power experience indicated the possibility of mid-cycle inspections and reductions in unit power. Therefore, economic considerations led to the decision to repair the steam generators (i.e., replace the steam generator lower assemblies). Three new Model 51F Steam Generator lower assembly units were ordered from Westinghouse. Virginia Power contracted Bechtel Power Corporation to provide the engineering and construction support to repair the Unit 1 steam generators. On January 4, 1993, after an extended coastdown period, North Anna Unit 1 was brought off-line and the 110 day (breaker-to-breaker) Steam Generator Replacement Project (SGRP) outage began. As of this paper, the outage is still in progress

  18. Probabilistic fire risk assessment for Koeberg Nuclear Power Station Unit 1

    International Nuclear Information System (INIS)

    Grobbelaar, J.F.; Foster, N.A.S.; Luesse, L.J.

    1995-01-01

    A probabilistic fire risk assessment was done for Koeberg Nuclear Power Station Unit 1. Areas where fires are likely to start were identified. Equipment important to safety, as well as their power and/or control cable routes were identified in each fire confinement sector. Fire confinement sectors where internal initiating events could be caused by fire were identified. Detection failure and suppression failure fault trees and event trees were constructed. The core damage frequency associated with each fire confinement sector was calculated, and important fire confinement sectors were identified. (author)

  19. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit-1: Analysis of core damage frequency from internal events during mid-loop operations. Appendix I, Volume 2, Part 5

    Energy Technology Data Exchange (ETDEWEB)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J. [Brookhaven National Lab., Upton, NY (United States); Bley, D.; Johnson, D. [PLG Inc., Newport Beach, CA (United States); Holmes, B. [AEA Technology, Dorset (United Kingdom)] [and others

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Lab. (BNL) and Sandia National Labs. (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this volume of the report is to document the approach utilized in the level-1 internal events PRA for the Surry plant, and discuss the results obtained. A phased approach was used in the level-1 program. In phase 1, which was completed in Fall 1991, a coarse screening analysis examining accidents initiated by internal events (including internal fire and flood) was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis.

  20. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit-1: Analysis of core damage frequency from internal events during mid-loop operations. Appendix I, Volume 2, Part 5

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Bley, D.; Johnson, D.; Holmes, B.

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Lab. (BNL) and Sandia National Labs. (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this volume of the report is to document the approach utilized in the level-1 internal events PRA for the Surry plant, and discuss the results obtained. A phased approach was used in the level-1 program. In phase 1, which was completed in Fall 1991, a coarse screening analysis examining accidents initiated by internal events (including internal fire and flood) was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis

  1. Analysis of internal events for the Unit 1 of the Laguna Verde nuclear power station

    International Nuclear Information System (INIS)

    Huerta B, A.; Aguilar T, O.; Nunez C, A.; Lopez M, R.

    1993-01-01

    This volume presents the results of the starter event analysis and the event tree analysis for the Unit 1 of the Laguna Verde nuclear power station. The starter event analysis includes the identification of all those internal events which cause a disturbance to the normal operation of the power station and require mitigation. Those called external events stay beyond the reach of this study. For the analysis of the Laguna Verde power station eight transient categories were identified, three categories of loss of coolant accidents (LOCA) inside the container, a LOCA out of the primary container, as well as the vessel break. The event trees analysis involves the development of the possible accident sequences for each category of starter events. Events trees by systems for the different types of LOCA and for all the transients were constructed. It was constructed the event tree for the total loss of alternating current, which represents an extension of the event tree for the loss of external power transient. Also the event tree by systems for the anticipated transients without scram was developed (ATWS). The events trees for the accident sequences includes the sequences evaluation with vulnerable nucleus, that is to say those sequences in which it is had an adequate cooling of nucleus but the remoting systems of residual heat had failed. In order to model adequately the previous, headings were added to the event tree for developing the sequences until the point where be solved the nucleus state. This process includes: the determination of the failure pressure of the primary container, the evaluation of the environment generated in the reactor building as result of the container failure or cracked of itself, the determination of the localization of the components in the reactor building and the construction of boolean expressions to estimate the failure of the subordinated components to an severe environment. (Author)

  2. Summary of plant life management evaluation for Onagawa Nuclear Power Station Unit-1

    International Nuclear Information System (INIS)

    Nodate, Kazumi

    2014-01-01

    The Onagawa Nuclear Power Station Unit-1 (Onagawa NPS-1) began commercial operation on June 1, 1984, and has reached 30-year from starting of operation on June of 2014. To that end, we implemented the Plant Life Management (PLM) evaluation for Onagawa NPS-1 as our first experience. We decided on a Long-term Maintenance Management Policy from result of the evaluation, and then applied the Safety-Regulations change approval application on November 6, 2013 and its correcting application on April 16, 2014. Our application was approved on May 21, 2014 through investigation by the Nuclear Regulatory Agency. Also at implementation of the PLM evaluation, we considered effects of the Great East Japan Earthquake that occurred on March 11, 2011 against ageing phenomena. In this paper, we introduce summary of PLM evaluation for Onagawa NPS-1 and the evaluation that considered effects of the Great East Japan Earthquake. (author)

  3. Results of the 5th regular inspection of Unit 1 in the Hamaoka Nuclear Power Station

    International Nuclear Information System (INIS)

    1983-01-01

    The 5th regular inspection of Unit 1 in the Hamaoka Nuclear Power Station was carried out from March 27 to July 27, 1982. Inspection was made on the reactor proper, reactor cooling system, instrumentation/control system, radiation control facility, etc. By the examinations of external appearance, leakage, performance, etc., no abnormality was observed. In the regular inspection, personnel exposure dose was all below the permissible level. The works done during the inspection were the following: the replacement of control rod drives, the replacement of core support-plate plugs, the repair of steam piping, steam extraction pipes and feed water heaters, the repair of a waste-liquid concentrator, the installation of barriers and leak detectors, the installation of drain sump monitors in a containment vessel, the replacement of concentrated liquid waste pumps, the employment of type B fuel. (Mori, K.)

  4. An independent spent-fuel storage installation at Surry Station: Design and operation

    International Nuclear Information System (INIS)

    McKay, H.S.; Wakeman, B.H.; Pickworth, J.M.; Routh, S.D.; Hopkins, W.C.

    1989-07-01

    Design and licensing of the Surry Power Station Independent Spent Fuel Storage Installation (ISFSI) was initiated in 1982 by Virginia Power as part of a comprehensive strategy to increase spent fuel storage capacity at the Station. Designed to use large, metal dry storage casks, the Surry ISFSI will accommodate 84 such casks with a total storage capacity of 811 MTU of spent PWR fuel assemblies. The ISFSI is located at the Surry Station in a wooded area approximately 1000 meters (3300 feet) east of the reactor facilities. Construction of the first of three reinforced concrete storage pads and its associated support systems was completed in March 1986. The operating license and Technical Specifications were issued by the US NRC on July 2, 1986. Initial loading operations of a General Nuclear Systems, Inc., CASTOR V/21 storage cask began in September 1986. The first two CASTOR V/21 casks were placed in storage at the ISFSI in December 1986. 16 refs., 33 figs., 16 tabs

  5. Final environmental statement for Shoreham Nuclear Power Station, Unit 1: (Docket No. 50-322)

    International Nuclear Information System (INIS)

    1977-10-01

    The proposed action is the issuance of an Operating License to the Long Island Lighting Company (LILCO) for the startup and operation of the Shoreham Nuclear Power Station, Unit 1 (the plant) located on the north shore of Long Island, the State of New York, County of Suffolk, in the town of Brookhaven. The Shoreham station will employ a boiling-water reactor (BWR), which will operate at a thermal output of 2436 MW leading to a gross output of 846 MWe and a net output of about 820 MWe. The unit will be cooled by once-through flow of water from the Long Island Sound. One nuclear unit with a net capacity of 820 MWe will be added to the generating resources of the Long Island Lighting Company. This will have a favorable effect on reserve margins and provide a cost savings of approximately $62.1 million (1980 dollars) in production costs in 1980 if the unit comes on line as scheduled; additional cost savings will be realized in subsequent years. Approximately 100 acres (40 hectares) of the 500-acre (202-hectare) site of rural (mostly wooded) land owned by the applicant have been cleared. Most of this will be unavailable for other uses during at least the 40-year life of the plant. No offsite acreage has been or will be cleared. Land in the vicinity of the site has undergone some residential development that is typical for all of this area of Long Island. The operation of Shoreham Unit 1 will have insignificant impacts on this and other types of land uses in the vicinity of the site. 33 figs., 56 tabs

  6. Second periodic safety review of Angra Nuclear Power Station, unit 1

    Energy Technology Data Exchange (ETDEWEB)

    Martins, Carlos F.O.; Crepaldi, Roberto; Freire, Enio M., E-mail: ottoncf@tecnatom.com.br, E-mail: emfreire46@gmail.com, E-mail: robcrepaldi@hotmail.com [Tecnatom do Brasil Engenharia e Servicos Ltda, Rio de Janeiro, RJ (Brazil); Campello, Sergio A., E-mail: sacampe@eletronuclear.gov.br [Eletrobras Termonuclear S.A. (ELETRONUCLEAR), Rio de Janeiro, RJ (Brazil)

    2015-07-01

    This paper describes the second Periodic Safety Review (PSR2-A1) of Angra Nuclear Power Station, Unit 1, prepared by Eletrobras Eletronuclear S.A. and Tecnatom do Brasil Engenharia e Servicos Ltda., during Jul.2013-Aug.2014, covering the period of 2004-2013. The site, in Angra dos Reis-RJ, Brazil, comprises: Unit 1, (640 MWe, Westinghouse PWR, operating), Unit 2 (1300 MWe, KWU/Areva, operating) and Unit 3 (1405 MWe, KWU/Areva, construction). The PSR2-A1 attends the Standards 1.26-Safety in Operation of Nuclear Power Plants, Brazilian Nuclear Regulatory Commission (CNEN), and IAEA.SSG.25-Periodic Safety Review of Nuclear Power Plants. Within 18 months after each 10 years operation, the operating organization shall perform a plant safety review, to investigate the evolution consequences of safety code and standards, regarding: Plant design; structure, systems and components behavior; equipment qualification; plant ageing management; deterministic and probabilistic safety analysis; risk analysis; safety performance; operating experience; organization and administration; procedures; human factors; emergency planning; radiation protection and environmental radiological impacts. The Review included 6 Areas and 14 Safety Parameters, covered by 33 Evaluations.After document evaluations and discussions with plant staff, it was generated one General and 33 Specific Guide Procedures, 33 Specific and one Final Report, including: Description, Strengths, Deficiencies, Areas for Improvement and Conclusions. An Action Plan was prepared by Electronuclear for the recommendations. It was concluded that the Unit was operated within safety standards and will attend its designed operational lifetime, including possible life extensions. The Final Report was submitted to CNEN, as one requisite for renewal of the Unit Permanent Operation License. (author)

  7. Second periodic safety review of Angra Nuclear Power Station, unit 1

    International Nuclear Information System (INIS)

    Martins, Carlos F.O.; Crepaldi, Roberto; Freire, Enio M.; Campello, Sergio A.

    2015-01-01

    This paper describes the second Periodic Safety Review (PSR2-A1) of Angra Nuclear Power Station, Unit 1, prepared by Eletrobras Eletronuclear S.A. and Tecnatom do Brasil Engenharia e Servicos Ltda., during Jul.2013-Aug.2014, covering the period of 2004-2013. The site, in Angra dos Reis-RJ, Brazil, comprises: Unit 1, (640 MWe, Westinghouse PWR, operating), Unit 2 (1300 MWe, KWU/Areva, operating) and Unit 3 (1405 MWe, KWU/Areva, construction). The PSR2-A1 attends the Standards 1.26-Safety in Operation of Nuclear Power Plants, Brazilian Nuclear Regulatory Commission (CNEN), and IAEA.SSG.25-Periodic Safety Review of Nuclear Power Plants. Within 18 months after each 10 years operation, the operating organization shall perform a plant safety review, to investigate the evolution consequences of safety code and standards, regarding: Plant design; structure, systems and components behavior; equipment qualification; plant ageing management; deterministic and probabilistic safety analysis; risk analysis; safety performance; operating experience; organization and administration; procedures; human factors; emergency planning; radiation protection and environmental radiological impacts. The Review included 6 Areas and 14 Safety Parameters, covered by 33 Evaluations.After document evaluations and discussions with plant staff, it was generated one General and 33 Specific Guide Procedures, 33 Specific and one Final Report, including: Description, Strengths, Deficiencies, Areas for Improvement and Conclusions. An Action Plan was prepared by Electronuclear for the recommendations. It was concluded that the Unit was operated within safety standards and will attend its designed operational lifetime, including possible life extensions. The Final Report was submitted to CNEN, as one requisite for renewal of the Unit Permanent Operation License. (author)

  8. Draft environmental impact statement. River Bend Nuclear Power Station, Unit 1

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    Federal financing of an undivided ownership interest of River Bend Nuclear Power Station Unit 1 on a 3293-acre site near St. Francisville, Louisiana is proposed in a supplement to the final environmental impact statement of September 1974. The facility would consist of a boiling-water reactor that would produce a maximum of 2894 megawatts (MW) of electrical power. A design level of 3015 MW of electric power could be realized at some time in the future. Exhaust steam would be cooled by mechanical cooling towers using makeup water obtained from and discharged to the Mississippi River. Power generated by the unit would be transmitted via three lines totaling 140 circuit miles traversing portions of the parishes of West Feliciana, East Feliciana, East Baton Rouge, West Baton Rouge, Pointe Coupee, and Iberville. The unit would help the applicant meet the power needs of rural electric consumers in the region, and the applicant would contribute significanlty to area tax base and employment rolls during the life of the unit. Construction related activities would disturb 700 forested acres on the site and 1156 acres along the transmission routes. Of the 60 cubic feet per second (cfs) taken from the river, 48 cfs would evaporate during the cooling process and 12 cfs would return to the river with dissolved solids concentrations increased by 500%. The terrace aquifer would be dewatered for 16 months in order to lower the water table at the building site, and Grants Bayou would be transformed from a lentic to a lotic habitat during this period. Fogging and icing due to evaporation and drift from the cooling towers would increase slightly. During the construction period, farming, hunting, and fishing on the site would be suspended, and the social infractructure would be stressed due to the influx of a maximum of 2200 workers

  9. Efforts to perform safe and efficient decommissioning for Tsuruga Power Station Unit 1

    International Nuclear Information System (INIS)

    Saito, Shiro; Yamauchi, Toyoaki; Austin, Colin R.

    2017-01-01

    Tsuruga Power Station Unit-1 (Tsuruga-1) started commercial operation in March 1970, and the decision to terminate operation was made in 2015. In April 2016, JAPC signed an agreement with Energy Solutions (ES) on strategic cooperation for domestic D and D projects for introduction of successful international experiences. As a first step in this cooperation, D and D know-how developed by ES in the US is being applied to Tsuruga-1 with verifying its applicability to domestic D and D projects. One of the efforts is human resource development. JAPC has also started introduction of ES's project management method to the Tsuruga-1 project for solid project management and the base line is currently being prepared. Regarding the waste disposal paths, application document of approval for measurement and evaluation of clearance material was submitted in September 2016. However the disposal paths for waste are not established in Japan. It is necessary to cooperate with the government, utilities and local stakeholders to establish waste disposal paths. Because it is also important to obtain the understanding from local communities, JAPC and ES will try positively to utilize local companies for D and D works. JAPC and ES believe that their relationship will ensure success of the Tsuruga-1 NPP decommissioning project. (author)

  10. Results of the 4th regular inspection in Unit 1 of the Mihama Nuclear Power Station

    International Nuclear Information System (INIS)

    1981-01-01

    The 4th regular inspection of Unit 1 in the Mihama Nuclear Power Station was made from July, 1975, to December, 1980, on its reactor and associated facilities. The respective stages of inspection during the years are described. The inspection by external appearance examination, disassembling leakage inspection and performance tests indicated crackings in piping for fuel-replacement water tank, the container penetration of recirculation pipe for residual-heat removal, and main steam-relief valve, and leakage in one fuel assembly. Radiation exposure of the personnel during the inspection was less than the permissible dose. Radiation exposure data for the personnel are given in tables. The improvements and repairs done accordingly were as follows: reapir of the piping for a fuel-replacement tank and recirculation piping for residual-heat removal, replacement of the main steam-relief valve, plugging of heating tubes for the steam-generator, replacement of pins and covers for control-rod guide pipes, improvement of safety protection system and installation of rare gas monitor. (J.P.N.)

  11. Data book of examination of the ruptured pipe at the Hamaoka Nuclear Power Station Unit-1

    International Nuclear Information System (INIS)

    2002-03-01

    In order to investigate root cause of the pipe rupture, which took place at the Hamaoka Nuclear Power Station Unit-1 of Chubu Electric Power Company on November 7, 2001, a task force was established within the Nuclear and Industrial Safety Agency (NISA) and initiated a detailed investigation of the ruptured pipe. The Japan Atomic Energy Research Institute (JAERI) was asked from the Ministry of Education, Culture, Sports, Science and Technology (MEXT) in response to the request from NISA to cooperate as an independent neutral organization with NISA and perform an examination of the ruptured pipe independently from Chubu Electric Power Company. JAERI accepted the request by considering the fact that JAERI is an integrated research institution for nuclear research and development, a prime research institution for nuclear safety research, a research institution with experience of root-cause investigation of various nuclear incidents and accidents of domestic as well as overseas, and a research institution provided with advanced examination facilities necessary for examination of the ruptured pipe. The JAERI examination group was formed at the Tokai Research Establishment and conducted detailed and thorough examination of the pieces taken from the ruptured pipe primarily in the Reactor Fuel Examination Facility (RFEF) with the use of tools such as scanning electron microscopes and other equipments. Purpose of examination was to provide technical information in order to identify causes of the pipe rupture through examination of the pieces taken from the ruptured region of the pipe. The result of the present examination has already been reported to NISA and has also been published as the JAERI-Tech report No.2001-94. This report is a data book containing the detailed data obtained by the present examination. (author)

  12. Report of examination of the ruptured pipe at the Hamaoka Nuclear Power Station Unit-1

    International Nuclear Information System (INIS)

    2001-12-01

    In order to investigate root cause of the pipe rupture, which took place at the Hamaoka Nuclear Power Station Unit-1 of Chubu Electric Power Company on November 7, 2001, a task force was established within the Nuclear and Industrial Safety Agency (NISA) and initiated a detailed investigation of the ruptured pipe. The Japan Atomic Energy Research Institute (JAERI) was asked from the Ministry of Education, Culture, Sports, Science and Technology (MEXT) in response to the request from NISA to cooperate as an independent neutral organization with NISA and perform an examination of the ruptured pipe independently from Chubu Electric Power Company. JAERI accepted the request by considering the fact that JAERI is an integrated research institution for nuclear research and development, a prime research institution for nuclear safety research, a research institution with experience of root-cause investigation of various nuclear incidents and accidents of domestic as well as overseas, and a research institution provided with advanced examination facilities necessary for examination of the ruptured pipe. The JAERI examination group was formed at the Tokai Research Establishment and conducted detailed and thorough examination of the pieces taken from the ruptured pipe primarily in the Reactor Fuel Examination Facility (RFEF) with the use of tools such as scanning electron microscopes and other equipments. Purpose of examination was to provide technical information in order to identify causes of the pipe rupture through examination of the pieces taken from the ruptured region of the pipe. The following findings and conclusion were made as the result of the present examination. (1) Wall thickness of the pipe was significantly reduced in the ruptured region. (2) Dimple pattern resulting from ductile fracture by shearing was observed in the fracture surfaces of nearly all of the pieces and no indication of fatigue crack growth was found. (3) Microstructure showed a typical carbon

  13. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations. Appendix E (Sections E.9-E.16), Volume 2, Part 3B

    Energy Technology Data Exchange (ETDEWEB)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Wong, S.M. [Brookhaven National Lab., Upton, NY (United States); Bley, D.; Johnson, D. [PLG Inc., Newport Beach, CA (United States)] [and others

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The scope of the level-1 study includes plant damage state analysis, and uncertainty analysis. Volume 1 summarizes the results of the study. Internal events analysis is documented in Volume 2. It also contains an appendix that documents the part of the phase 1 study that has to do with POSs other than mid-loop operation. Internal fire and internal flood analyses are documented in Volumes 3 and 4. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. Volume 6 documents the accident progression, source terms, and consequence analysis.

  14. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit-1: Analysis of core damage frequency from internal events during mid-loop operations. Appendices F-H, Volume 2, Part 4

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Bley, D.; Johnson, D.; Holmes, B.

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The scope of the level-1 study includes plant damage state analysis, and uncertainty analysis. Volume 1 summarizes the results of the study. Internal events analysis is documented in Volume 2. It also contains an appendix that documents the part of the phase 1 study that has to do with POSs other than mid-loop operation. Internal fire and internal flood analyses are documented in Volumes 3 and 4. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. Volume 6 documents the accident progression, source terms, and consequence analysis

  15. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations. Appendix E (Sections E.9-E.16), Volume 2, Part 3B

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Wong, S.M.; Bley, D.; Johnson, D.

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The scope of the level-1 study includes plant damage state analysis, and uncertainty analysis. Volume 1 summarizes the results of the study. Internal events analysis is documented in Volume 2. It also contains an appendix that documents the part of the phase 1 study that has to do with POSs other than mid-loop operation. Internal fire and internal flood analyses are documented in Volumes 3 and 4. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. Volume 6 documents the accident progression, source terms, and consequence analysis

  16. 78 FR 29158 - In the Matter of Zion Solutions, LLC; Zion Nuclear Power Station, Units 1 and 2; Order Approving...

    Science.gov (United States)

    2013-05-17

    ... and DPR-48] In the Matter of Zion Solutions, LLC; Zion Nuclear Power Station, Units 1 and 2; Order... formed for the purpose of acquiring ES, Inc. and is held by certain investment fund entities organized by... Environmental Management Programs, in writing, of such receipt no later than one (1) business day prior to the...

  17. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Evaluation of severe accident risk during mid-loop operations. Main report. Volume 6. Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Jo, J.; Lin, C.C.; Neymotin, L. [Brookhaven National Lab., Upton, NY (United States)] [and others

    1995-05-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. A phased approach was used in the level-1 program. In phase 1 which was completed in Fall 1991, a coarse screening analysis including internal fire and flood was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The results of the phase 2 level 2/3 study are the subject of this volume of NUREG/CR-6144, Volume 6.

  18. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Evaluation of severe accident risk during mid-loop operations. Main report. Volume 6. Part 1

    International Nuclear Information System (INIS)

    Jo, J.; Lin, C.C.; Neymotin, L.

    1995-05-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. A phased approach was used in the level-1 program. In phase 1 which was completed in Fall 1991, a coarse screening analysis including internal fire and flood was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The results of the phase 2 level 2/3 study are the subject of this volume of NUREG/CR-6144, Volume 6

  19. Analysis of internal events for the Unit 1 of the Laguna Verde Nuclear Power Station. Appendixes

    International Nuclear Information System (INIS)

    Huerta B, A.; Lopez M, R.

    1995-01-01

    This volume contains the appendices for the accident sequences analysis for those internally initiated events for Laguna Verde Unit 1, Nuclear Power Plant. The appendix A presents the comments raised by the Sandia National Laboratories technical staff as a result of the review of the Internal Event Analysis for Laguna Verde Unit 1 Nuclear Power Plant. This review was performed during a joint Sandia/CNSNS multi-day meeting by the end 1992. Also included is a brief evaluation on the applicability of these comments to the present study. The appendix B presents the fault tree models printed for each of the systems included and.analyzed in the Internal Event Analysis for LVNPP. The appendice C presents the outputs of the TEMAC code, used for the cuantification of the dominant accident sequences as well as for the final core damage evaluation. (Author)

  20. Analysis of internal events for the Unit 1 of the Laguna Verde Nuclear Power Station. Appendixes

    International Nuclear Information System (INIS)

    Huerta B, A.; Lopez M, R.

    1995-01-01

    This volume contains the appendices for the accident sequences analysis for those internally initiated events for Laguna Verde Unit 1, Nuclear Power Plant. The appendix A presents the comments raised by the Sandia National Laboratories technical staff as a result of the review of the Internal Event Analysis for Laguna Verde Unit 1 Nuclear Power Plant. This review was performed during a joint Sandia/CNSNS multi-day meeting by the end 1992. Also included is a brief evaluation on the applicability of these comments to the present study. The appendix B presents the fault tree models printed for each of the systems included and analyzed in the Internal Event Analysis for LVNPP. The appendice C presents the outputs of the TEMAC code, used for the cuantification of the dominant accident sequences as well as for the final core damage evaluation. (Author)

  1. 75 FR 8757 - Nebraska Public Power District, Cooper Nuclear Station, Unit 1; Notice of Availability of the...

    Science.gov (United States)

    2010-02-25

    ..., Cooper Nuclear Station, Unit 1; Notice of Availability of the Draft Supplement 41 to the Generic... Renewal of Cooper Nuclear Station, Unit 1 Notice is hereby given that the U.S. Nuclear Regulatory... operating license DPR-46 for an additional 20 years of operation for Cooper Nuclear Station, Unit 1 (CNS-1...

  2. Browns Ferry Nuclear Power Station, Units 1, 2, and 3. Semiannual report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Browns Ferry units 1 and 2 operated at maximum power from January 1 to March 22 except as limited by thermal margins, fuel preconditioning, optimum power shape, maintenance, and Unit 2 start-up tests. On March 22 a cable tray fire started causing spurious starting of equipment due to faulted control cables. The reactors were manually scrammed and placed in cold shutdown for fire investigation, clean up, and fuel removal. Information is also presented concerning maintenance, radiochemistry, occupational radiation exposure, release of radioactive materials, and non-radiological environmental monitoring

  3. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal floods during mid-loop operations. Volume 4

    International Nuclear Information System (INIS)

    Kohut, P.

    1994-07-01

    The major objective of the Surry internal flood analysis was to provide an improved understanding of the core damage scenarios arising from internal flood-related events. The mean core damage frequency of the Surry plant due to internal flood events during mid-loop operations is 4.8E-06 per year, and the 5th and 95th percentiles are 2.2E-07 and 1.8E-05 per year, respectively. Some limited sensitivity calculations were performed on three plant improvement options. The most significant result involves modifications of intake-level structure on the canal, which reduced core damage frequency contribution from floods in mid-loop by about 75%

  4. Structural design of the turbine building of Angra Nuclear Power Station, Unit 1

    International Nuclear Information System (INIS)

    Varella, L.N.; Reis, F.J.C.; Jurkiewicz, W.J.

    1978-01-01

    The Turbine Building of the Angra Nuclear Power Plant, Unit 1, and particularly its structure and structural design are described. The Turbine Building, as far as its structure is concerned, deviates from the standard structure of any turbine building due to the fact that huge ducts are provided in the foundation mat as to accomodate the circulating water system. This aspect and the fact that the building is founded upon a very deep strata of compacted and controlled fill, makes out of the building structure 'a concrete ship floating in the sea of sand', and by the same reason presents by itself an interesting structure, worth to be known to all engineers involved in design of power plants. This pape, suplemented by a few slides shown during presentation of the paper at the conference, covers the subject mainly from the designers' point of view. (Author)

  5. Experience and development of on-line BWR surveillance system at Onagawa nuclear power station unit-1

    International Nuclear Information System (INIS)

    Kishi, A.; Chiba, K.; Kato, K.; Ebata, S.; Ando, Y.; Sakamoto, H.

    1986-01-01

    ONAGAWA nuclear power station Unit-1 (Tohoku Electric Power Co.) is a BWR-4 nuclear power station of 524 MW electric power which started commercial operation in June 1984. To attain high reliability and applicability for ONAGAWA-1, Tohoku Electric Power Co. and Toshiba started a Research and Development project on plant surveillance and diagnosis from April 1982. Main purposes of this project are to: (1) Develop an on-line surveillance system and acquire its operating experience at a commercial BWR, (2) Assist in plant operation and maintenance by data acquisition and analysis, (3) Develop a new technique for plant surveillance and diagnosis. An outline of the project, operating experience gained from the on-line surveillance system and an introduction to new diagnosis techniques are reported in this paper. (author)

  6. Management of main generator condition during long term plant shut down at Higashidori Nuclear Power Station Unit 1

    International Nuclear Information System (INIS)

    Kato, Seiji

    2014-01-01

    Higashidori Nuclear Power Station Unit 1 shut down on February 6, 2011 to start 4th refuel outage. On March 11, 2011, we keep going refuel outage on this moment a large earthquake occurred and tsunami was generated following it which called 'Great East Japan Earthquake'. Refuel outage takes 3 ∼ 5 months normally but Higashidori NPS still keeping shut down over 3 years due to some issues. In this paper, we introduce about management of Main generator condition during long term plant shut down situation in addition to normal plant shut down situation to keep well. (author)

  7. Technical evaluation of RETS-required reports for Browns Ferry Nuclear Power Station, Units 1, 2, and 3, for 1983

    International Nuclear Information System (INIS)

    Young, T.E.; Magleby, E.H.

    1985-01-01

    A review was performed of reports required by federal regulations and the plant-specific radiological effluent technical specifications (RETS) for operations conducted at Tennessee Valley Authority's Browns Ferry Nuclear Station, Units 1, 2, and 3, during 1983. The two periodic reports reviewed were (a) the Effluents and Waste Disposal Semiannual Report, First Half 1983 and (b) the Effluents and Waste Disposal Semiannual Report, Second Half 1983. The principal review guidelines were the plant's specific RETs and NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably complete and consistent with the review guidelines

  8. 76 FR 30204 - Exelon Nuclear, Dresden Nuclear Power Station, Unit 1; Exemption From Certain Security Requirements

    Science.gov (United States)

    2011-05-24

    ... contained in the Responsibility Matrix of the safeguards contingency plan.'' Part 73 of Title 10 of the Code... organization, which will have as its objective to provide high assurance that activities involving special... structures) for DNPS Unit 1 is in a form that does not pose a risk of removal (i.e., an intact reactor...

  9. Dresden Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January thru December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 953,015.5 MWH with the generator on line 7,399.37 hrs. Unit 2 generated 4,371,553.689 MWH with the generator on line 6,664.58 hrs while Unit 3 generated 4,034,251 MWH with the generator on line 7,234.86 hrs. Information is presented concerning operations, maintenance, and shutdowns

  10. Damage of the Unit 1 reactor building overhead bridge crane at Onagawa Nuclear Power Station caused by the Great East Japan Earthquake and its repair works

    International Nuclear Information System (INIS)

    Sugamata, Norihiko

    2014-01-01

    The driving shaft bearings of the Unit 1 overhead bridge crane were damaged by the Great East Japan Earthquake at Onagawa Nuclear Power Station. The situation, investigation and repair works of the bearing failure are introduced in this paper. (author)

  11. Pilgrim Nuclear Power Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    Net electrical power generated was 2,415,511 MWH with the generator on line 5,333.6 hrs. Information is presented concerning operations, procedure changes, tests, experiments, maintenance, unit shutdowns and power reductions, and radiation doses to personnel

  12. Millstone Nuclear Power Station, Unit 1. Annual operating report: 1 January--31 December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical power generated was 3,752,445 MWh with the generator on line 6,682 hrs. Information is presented concerning operations; shutdowns and power reductions; refueling; maintenance; failed fuel elements; power generation; occupational personnel radiation exposure; and changes in technical specifications, plant design, and key supervisory personnel

  13. Beaver Valley Power Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    Net electrical energy generated was 441,530 MWH with the generator on line 1714.9 hours. Information is presented concerning operations, maintenance, changes, licensee event reports, power generation, shutdowns and forced power reductions, personnel radiation exposures, and unique reporting requirements

  14. Millstone Nuclear Power Station, Unit 1. Semiannual operating report, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 1,525,943 MWh(e) with the reactor on line 2,682 hrs. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, environmental effects monitoring, release of radioactive materials, and reportable occurrences. Occupational personnel radiation exposures will be submitted later

  15. Millstone Nuclear Power Station, Unit 1. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Net electrical power generated was 2,373,130 MWH(e) with the reactor on line 3,915 hrs. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental radiation monitoring. (FS)

  16. 78 FR 66385 - Omaha Public Power District Fort Calhoun Station, Unit 1; Exemption

    Science.gov (United States)

    2013-11-05

    ... Nuclear Energy Institute (NEI) 06-11, ``Managing Personnel Fatigue at Nuclear Power Reactor Sites...), no environmental impact statement or environmental assessment is required to be prepared in..., regulations, and orders of the U.S. Nuclear Regulatory Commission (NRC) now or hereafter in effect. The...

  17. Pilgrim Nuclear Power Station, Unit 1. Fifth semiannual operating and maintenance report, July--December 1974

    International Nuclear Information System (INIS)

    1974-01-01

    During this period the reactor was critical for 3,550.3 hrs and the net electrical power generated was 1,973,033 MWH. Information is presented concerning operations, maintenance, radioactive effluents, environmental monitoring, and radioactive materials released to unrestricted areas. (U.S.)

  18. Accident tolerant clad material modeling by MELCOR: Benchmark for SURRY Short Term Station Black Out

    International Nuclear Information System (INIS)

    Wang, Jun; Mccabe, Mckinleigh; Wu, Lei; Dong, Xiaomeng; Wang, Xianmao; Haskin, Troy Christopher; Corradini, Michael L.

    2017-01-01

    Highlights: • Thermo-physical and oxidation kinetics properties calculation and analysis of FeCrAl. • Properties modelling of FeCrAl in MELCOR. • Benchmark calculation of Surry nuclear power plant. - Abstract: Accident tolerant fuel and cladding materials are being investigated to provide a greater resistance to fuel degradation, oxidation and melting if long-term cooling is lost in a Light Water Reactor (LWR) following an accident such as a Station Blackout (SBO) or Loss of Coolant Accident (LOCA). Researchers at UW-Madison are analyzing an SBO sequence and examining the effect of a loss of auxiliary feedwater (AFW) with the MELCOR systems code. Our research work considers accident tolerant cladding materials (e.g., FeCrAl alloy) and their effect on the accident behavior. We first gathered the physical properties of this alternative cladding material via literature review and compared it to the usual zirconium alloys used in LWRs. We then developed a model for the Surry reactor for a Short-term SBO sequence and examined the effect of replacing FeCrAl for Zircaloy cladding. The analysis uses MELCOR, Version 1.8.6 YR, which is developed by Idaho National Laboratory in collaboration with MELCOR developers at Sandia National Laboratories. This version allows the user to alter the cladding material considered, and our study examines the behavior of the FeCrAl alloy as a substitute for Zircaloy. Our benchmark comparisons with the Sandia National Laboratory’s analysis of Surry using MELCOR 1.8.6 and the more recent MELCOR 2.1 indicate good overall agreement through the early phases of the accident progression. When FeCrAl is substituted for Zircaloy to examine its performance, we confirmed that FeCrAl slows the accident progression and reduce the amount of hydrogen generated. Our analyses also show that this special version of MELCOR can be used to evaluate other potential ATF cladding materials, e.g., SiC as well as innovative coatings on zirconium cladding

  19. Accident tolerant clad material modeling by MELCOR: Benchmark for SURRY Short Term Station Black Out

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Jun, E-mail: jwang564@wisc.edu [College of Engineering, The University of Wisconsin-Madison, Madison 53706 (United States); Mccabe, Mckinleigh [College of Engineering, The University of Wisconsin-Madison, Madison 53706 (United States); Wu, Lei [Institute of Nuclear and New Energy Technology, Tsinghua University, Beijing 100084 (China); Dong, Xiaomeng [College of Engineering, The University of Wisconsin-Madison, Madison 53706 (United States); Wang, Xianmao [Institute of Nuclear and New Energy Technology, Tsinghua University, Beijing 100084 (China); Haskin, Troy Christopher [College of Engineering, The University of Wisconsin-Madison, Madison 53706 (United States); Corradini, Michael L., E-mail: corradini@engr.wisc.edu [College of Engineering, The University of Wisconsin-Madison, Madison 53706 (United States)

    2017-03-15

    Highlights: • Thermo-physical and oxidation kinetics properties calculation and analysis of FeCrAl. • Properties modelling of FeCrAl in MELCOR. • Benchmark calculation of Surry nuclear power plant. - Abstract: Accident tolerant fuel and cladding materials are being investigated to provide a greater resistance to fuel degradation, oxidation and melting if long-term cooling is lost in a Light Water Reactor (LWR) following an accident such as a Station Blackout (SBO) or Loss of Coolant Accident (LOCA). Researchers at UW-Madison are analyzing an SBO sequence and examining the effect of a loss of auxiliary feedwater (AFW) with the MELCOR systems code. Our research work considers accident tolerant cladding materials (e.g., FeCrAl alloy) and their effect on the accident behavior. We first gathered the physical properties of this alternative cladding material via literature review and compared it to the usual zirconium alloys used in LWRs. We then developed a model for the Surry reactor for a Short-term SBO sequence and examined the effect of replacing FeCrAl for Zircaloy cladding. The analysis uses MELCOR, Version 1.8.6 YR, which is developed by Idaho National Laboratory in collaboration with MELCOR developers at Sandia National Laboratories. This version allows the user to alter the cladding material considered, and our study examines the behavior of the FeCrAl alloy as a substitute for Zircaloy. Our benchmark comparisons with the Sandia National Laboratory’s analysis of Surry using MELCOR 1.8.6 and the more recent MELCOR 2.1 indicate good overall agreement through the early phases of the accident progression. When FeCrAl is substituted for Zircaloy to examine its performance, we confirmed that FeCrAl slows the accident progression and reduce the amount of hydrogen generated. Our analyses also show that this special version of MELCOR can be used to evaluate other potential ATF cladding materials, e.g., SiC as well as innovative coatings on zirconium cladding

  20. Integrated outages increase Surry's availability

    International Nuclear Information System (INIS)

    Harms, S.R.; Downs, J.L.

    1995-01-01

    This article describes how, through Virginia Power's and Westinghouse's goal-oriented planning philosophy, teamwork and commitment, average outage duration has decreased significantly. During the past 10 years Virginia Power and its nuclear steam supply system (NSSS) services vendor, Westinghouse Electric Corp., have developed a working partnership with one goal in mind: increasing the availability and capacity factors of the North Anna and Surry nuclear power stations while driving down the operating costs of the plants. The outage integration program, steam generator maintenance agreement (SGMA), and integrated radiological services program form the core of this relationship and helped Virginia Power complete one of the most successful outages in Surry Power Station's operating history

  1. Socio-economic impacts of nuclear generating stations: Surry case study

    International Nuclear Information System (INIS)

    Flynn, J.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Surry nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of the construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  2. Retrofit flue gas desulfurization system at Indianapolis Power and Light Co. Petersburg Station Units 1 and 2

    International Nuclear Information System (INIS)

    Watson, W.K.; Wolsiffer, S.R.; Youmans, J.; Martin, J.E.; Wedig, C.P.

    1992-01-01

    This paper briefly describes the status of the retrofit wet limestone flue gas desulfurization system (FGDS) project at Indianapolis Power and Light Company (IPL), Petersburg Units 1 and 2. This project was initiated by IPL in response to the Clean Air Act of 1990 and is intended to treat the flue gas from two base load units with a combined capacity of approximately 700 MW gross electrical output. IPL is the owner and operator of the Petersburg Station located in southwestern Indiana. Stone and Webster Engineering Corporation (Stone and Webster) is the Engineer and Constructor for the project. Radian Corporation is a subcontractor to Stone and Webster in the area of flue gas desulfurization (FGD) process. General Electric Environmental Systems, Inc. (GEESI) is the supplier of the FGDS. The project is organized as a team with each company providing services. The supplier of the new stack is scheduled to be selected and join the team in early 1992. Other material suppliers and field contractors will be selected in 1992

  3. Montague Nuclear Power Station, Units 1 and 2: Final environmental statement (Docket Nos. 50-496 and 50-497)

    International Nuclear Information System (INIS)

    1977-02-01

    The proposed action is the issuance of construction permits to the Northeast Nuclear Energy Company for the construction of the Montague Nuclear Power Station, Units 1 and 2, located on the Connecticut River in the Town of Montague, Massachusetts. The plant will employ two identical boiling-water reactors to produce up to 3579 megawatts thermal (MWt) each. Two steam turbine-generators will use this heat to provide 1150 MWe (net) of electrical power capacity from each turbine-generator. A design power level of 3759 MWt (1220 Mwe net) for each unit is anticipated at a future date and is considered in the assessments contained in this statement. The waste heat will be rejected through natural-draft cooling towers using makeup water obtained from and discharged to the Connecticut River. The 1900-acre site is about 90% forest, with the remaining acreage in transmission-line corridor and old-field vegetation. The total loss of mixed-age forest will be 1273 acres. Nodesignated scenic areas will be crossed. Sixty acres of public lands, State forests, and parks will be lost to transmission facilities as well as losses associated with crossings of 2.0 miles of water bodies and 11.9 miles of wetlands. The maximum estimated potential loss of salable wood products will be $849,600. A maximum of 85.8 cfs of cooling water will be withdrawn from the Connecticut River. A maximum of 17.2 cfs will be returned to the river with the dissolved solids concentration increased by a factor of about 5. A maximum of 68.6 cfs will be evaporated to the atmosphere by the cooling towers. 143 refs., 58 figs., 69 tabs

  4. A scoping evaluation of severe accidents at Surry and Grand Gulf Nuclear Power Plants resulting from earthquakes during shutdown conditions

    International Nuclear Information System (INIS)

    Budnitz, R.J.; Davis, P.R.

    1991-01-01

    This report explores the likelihood of seismic-initiated core damage accidents during refueling shutdown conditions at two nuclear power plants, Surry Unit I and Grand Gulf Unit 1. The effort is scoping in character, and has been performed primarily to establish if a potential problem exists sufficient to justify a more rigorous and more quantitative evaluation. A summary is presented of the important conclusions that have been reached. The most important conclusion is that the core-damage frequencies for earthquake-initiated accidents during shutdown at both Surry Unit I and Grand Gulf Unit I are found to be low in absolute terms. The reasons for this are that in their ability to respond to earthquakes during shutdowns, the plants both have large seismic capacities, well above their design-basis levels; and also that both sites enjoy among the lowest seismic hazards of any LWR sites in the US

  5. Browns Ferry Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Units 1 and 2 were down for the first half of the year caused by the fire of March 1975. Net electrical power generated by Unit 1 this year was 1,301,183 MWH with the generator on line 2,175.25 hrs. Unit 2 generated 1,567,170 MWH with the generator on line 2,548.73 hrs. Unit 3 began full power operation on November 20th and generated 1,416,891 MWH with the generator on line 2,058.20 hrs. Information is presented concerning operations, fuel performance, surveillance testing, containment leak testing, changes, power generation, shutdown and forced reductions, coolant chemistry, occupational radiation exposures, and maintenance

  6. Alteration in reactor installations (Unit 1 and 2 reactor facilities) in the Hamaoka Nuclear Power Station of The Chubu Electric Power Co., Inc. (report)

    International Nuclear Information System (INIS)

    1982-01-01

    A report by the Nuclear Safety Commission to the Ministry of International Trade and Industry concerning the alteration in Unit 1 and 2 reactor facilities in the Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc., was presented. The technical capabilities for the alteration of reactor facilities in Chubu Electric Power Co., Inc., were confirmed to be adequate. The safety of the reactor facilities after the alteration was confirmed to be adequate. The items of examination made for the confirmation of the safety are as follows: reactor core design (nuclear design, mechanical design, mixed reactor core), the analysis of abnormal transients in operation, the analysis of various accidents, the analysis of credible accidents for site evaluation. (Mori, K.)

  7. Integrated Plant Safety Assessment: Systematic Evaluation Program. Millstone Nuclear Power Station, Unit 1, Northeast Nuclear Energy Company, Docket No. 50-245. Final report

    International Nuclear Information System (INIS)

    1983-02-01

    This report documents the review of the Millstone Nuclear Power Station, Unit 1, operated by Northeast Nuclear Energy Company (located in Waterford, Connecticut). Millstone Nuclear Power Station, Unit 1, is one of ten plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. It is expected that this report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license. This report also addresses the comments and recommendations made by the Advisory Committee on Reactor Safeguards in connection with its review of the Draft Report, issued in November 1982

  8. Analyses of natural circulation during a Surry station blackout using SCDAP/RELAP5

    International Nuclear Information System (INIS)

    Bayless, P.D.

    1988-10-01

    The effects of reactor coolant system natural circulation on the response of the Surry nuclear power plant during a station blackout transient were investigated. A TMLB' sequence (loss of all ac power, immediate loss of auxillary feedwater) was simulated from transient initiation until after fuel rod relocation had begun. Integral analyses of the system thermal-hydraulics and the core damage behavior were performed using the SCDAP/RELAP5 computer code and several different models of the plant. Three scoping calculations were performed in which the complexity of the plant model was progressively increased to determine the overall effects of in-vessel and hot leg natural circulation flows on the plant response. The natural circulation flows extended the transient, slowing the core heatup and delaying core damage by transferring energy from the core to structures in the upper plenum and coolant loops. Increased temperatures in the ex-core structures indicated that they may fail, however. Nine sensitivity calculations were then performed to investigate the effects of modeling uncertainties on the multidimensional natural circulation flows and the system response. Creep rupture failure of the pressurizer surge line was predicted to occur in eight of the calculations, with the hot leg failing in the ninth. The failure time was fairly insensitive to the parameters varied. The failures occurred near the time that fuel rod relocation began, well before failure of the reactor vessel would be expected. A calculation was also performed in which creep rupture failure of the surge line was modeled. The subsequent blowdown led to rapid accumulator injection and quenching of the entire core. 18 refs., 105 figs., 17 tabs

  9. Technical evaluation of RETS-required reports for Zion Nuclear Power Station, Units 1 and 2 for 1983

    International Nuclear Information System (INIS)

    Young, T.E.; Magleby, E.H.

    1985-01-01

    A review was performed on the reports required by Federal regulations and the plant-specific Radiological Effluent Technical Specifications (RETS) for operations conducted at Commonwealth Edison's Zion Nuclear Power Station during 1983. The two periodic reports reviewed: (1) were the Effluent and Waste Disposal Semiannual Report, July-December 1983, and (2) the Radioactive Waste and Environmental Monitoring Annual Report - 1983. The principal review guidelines were the plant's specific RETS and NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably complete and consistent with the review guidelines

  10. Technical evaluation report on the monitoring of electric power to the reactor protection system for the Nine Mile Point Nuclear Station, Unit 1 (Docket No. 50-220)

    International Nuclear Information System (INIS)

    Selan, J.C.

    1984-01-01

    This report documents the technical evaluation of the monitoring of electric power to the reactor protection system (RPS) at the Nine Mile Point Nuclear Station, Unit 1. The evaluation is to determine if the proposed design modification will protect the RPS from abnormal voltage and frequency conditions which could be supplied from the power supplies and will meet certain requirements set forth by the Nuclear Regulatory Commission. The proposed design modifications will protect the RPS from sustained abnormal voltage and frequency conditions from the supplying sources

  11. FIND: Douglas Point Nuclear Generating Station, Units 1 and 2

    International Nuclear Information System (INIS)

    Moore, M.M.

    1975-12-01

    This index is presented as a guide to microfiche items 1 through 136 in Docket 50448, which was assigned to Potomac Electric Power Company's Application for Licenses to construct and operate Douglas Point Nuclear Generating Station, Units 1 and 2. Information received from August, 1973 through July, 1975 is included

  12. Technical evaluation of the noise and isolation testing of the safety features actuation system at the Davis Besse Nuclear Power Station, Unit 1

    International Nuclear Information System (INIS)

    Selan, J.C.

    1981-07-01

    This report documents the technical evaluation of the noise and isolation testing of the safety features actuation system at the Davis Besse Nuclear Power Station, Unit 1. The tests were to verify that faults on the non-Class 1E circuits would not propagate to the Class 1E circuits and degrade them below acceptable levels. The tests conducted demonstrated that the safety features actuation system did not degrade below acceptable levels nor was the system's ability to perform its protective functions affected

  13. Technical evaluation report on the proposed design modifications and technical specification changes on grid voltage degradation for the Millstone Nuclear Power Station, Unit 1

    International Nuclear Information System (INIS)

    Selan, J.C.

    1982-01-01

    This report documents the technical evaluation of the proposed design modifications and Technical Specification change for protection of Class 1E equipment from grid voltage degradation for the Millstone Nuclear Power Station, Unit 1. The review criteria are based on several IEEE standards and the Code of Federal Regulations. The evaluation finds that the licensee has not provided sufficient information on the undervoltage protection system to allow a complete evaluation into the adequacy of protecting the Class 1E equipment from sustained voltage degradation

  14. Integrated-plant-safety assessment Systematic Evaluation program. Millstone Nuclear Power Station, Unit 1, Northeast Nuclear Energy Company, Docket No. 50-245

    International Nuclear Information System (INIS)

    1982-11-01

    The Systematic Evaluation Program was initiated in February 1977 to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of the Millstone Nuclear Power Station, Unit 1, operated by Northeast Nuclear Energy Company (located in Waterford, Connecticut). Millstone Nuclear Power Station, Unit 1, is one of ten plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. It is expected that this report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license

  15. Dresden Nuclear Power Station, Units 1, 2, and 3. Semiannual report on operating and maintenance, July--December 1974

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 388,882 MWH(e) and was on line 3111.2 hours, Unit 2 generated 1,204,106 MWH(e) and was on line 2013.4 hours, and Unit 3 generated 2,250,810 MWH(e) and was on line 3836 hours. Information is presented concerning operations, shutdowns, maintenance, changes, tests, and experiments for the three units. (U.S.)

  16. Browns Ferry Nuclear Power Station, Units 1, 2, and 3. Annual operating report: 1 January--31 December 1977

    International Nuclear Information System (INIS)

    1978-01-01

    The three reactors operated at near full power generating 17,622,500 MWH gross electrical power. There were 153 major power reductions including 50 scrams mostly caused by equipment failures. Data are presented concerning operations, modifications, occupational exposures, effluent activity, and waste disposal

  17. Technical evaluation report on the adequacy of station electric-distribution-system voltages for the Millstone Nuclear Power Station, Units 1 and 2. Docket Nos. 50-245, 50-336

    International Nuclear Information System (INIS)

    Selan, J.C.

    1983-01-01

    This report documents the technical evaluation of the adequacy of the station electric-distribution-system voltages for the Millstone Nuclear Power Station, Units 1 and 2. The evaluation is to determine if the onsite distribution system, in conjunction with the offsite power sources, has sufficient capacity to automatically start and operate all Class 1E loads within the equipment voltage ratings under certain conditions established by the Nuclear Regulatory Commission. The analyses submitted demonstrate that adequate voltages will be supplied to the Class 1E equipment under the worst-case conditions analyzed

  18. Socioeconomic impacts of nuclear generating stations: Surry case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Flynn, J.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Surry nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  19. Technical evaluation report TMI action - NUREG-0737 (II.D.1) relief and safety valve testing for Clinton Power Station Unit 1. (Docket No. 50-461)

    International Nuclear Information System (INIS)

    Burr, T.K.; Magleby, H.L.

    1985-05-01

    Light water reactors operators have experienced a number of occurrences of improper performance by safety and relief valves installed in their primary coolant systems. Because of this, the authors of NUREG-0578 (TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations) recommended that programs be developed and completed which would reevaluate the performance capabilities of BWR safety and relief valves. This report has examined the response of the Licensee for the Clinton Power Station, Unit 1 to the requirements of NUREG-0578 and subsequently NUREG-0737 and finds that the Licensee has provided an acceptable response, reconfirming that the General Design Criteria 14, 15 and 30 of Appendix A to 10 CFR-50 have been met

  20. Final environmental statement: Related to the operation of Davis-Besse Nuclear Power Station, Unit 1 (Docket No. 50-346)

    International Nuclear Information System (INIS)

    1975-10-01

    The proposed action is the issuance of an operating license to the Toledo Edison Company and the Cleveland Electric Illuminating Company for the startup and operation of the Davis-Besse Nuclear Power Station Unit 1 (the station) located near Port Clinton in Ottawa County, Ohio. The total site area is 954 acres of which 160 acres have been removed from production of grain crops and converted to industrial use. Approximately 600 acres of the area is marshland which will be maintained as a wildlife refuge. The disturbance of the lake shore and lake bottom during construction of the station water intake and discharge pipes resulted in temporary turbidity, silting, and destruction of bottom organisms. Since completion of these activities, evidence of improvement in turbidity and transparency measurements, and the reestablishment of the bottom organism has been obtained. The cooling tower blowdown and service water which the station discharges to Lake Erie, via a submerged jet, will be heated no more than 20/degrees/F above the ambient lake water temperature. Although some small fish and plankton in the discharge water plume will be disabled as a result of thermal shock, exposure to chlorine and buffeting, few adult fish will be affected. The thermal plume resulting from the maximum thermal discharge is calculated to have an area of less than one acre within the 3/degrees/F isotherm (above lake ambient). Approximately 101 miles of transmission lines have been constructed, primarily over existing farmland, requiring about 1800 acres of land for the rights-of-way. Land use will essentially be unchanged since only the land required for the base of the towers is removed from production. Herbicides will not be used to maintain the rights-of-way. 14 figs., 34 refs

  1. Assessment of the potential for HPME during a station blackout in the Surry and Zion PWRS

    International Nuclear Information System (INIS)

    Knudson, D.L.; Bayless, P.D.; Dobbe, C.A.; Odar, F.

    1994-01-01

    The integrity of a PWR (pressurized water reactor) containment structure could be challenged by direct heating associated with a HPME (high pressure melt ejection) of core materials following reactor vessel lower head breach during certain severe accidents. Structural failure resulting from direct containment heating is a contributor to the risk of operating a PWR. Intentional RCS (reactor coolant system) depressurization, where operators latch pressurizer relief valves open, has been proposed as an accident management strategy to reduce those risks by mitigating the severity of the HPME. However, decay heat levels, valve capacities, and other plant-specific characteristics determine whether the required operator action will be effective. Without operator action, natural circulation flows could heat ex-vessel RCS pressure boundaries (surge line and hot leg piping, steam generator tubes, etc.) to the point of failure before failure of the lower head providing an unintentional mechanism for depressurization and HPME mitigation. This paper summarizes an assessment of RCS depressurization with respect to the potential for HPME during a station blackout in the Surry and Zion PWRs. The assessment included a detailed transient analysis using the SCDAP/RELAP5/MOD3 computer code and an evaluation of RCS depressurization-related probabilities primarily based on the code results

  2. Technical evaluation report on the seven main transformer failures at the North Anna Power Station, Units 1 and 2 (Docket Nos. 50-338, 50-339)

    International Nuclear Information System (INIS)

    Dalton, K.J.; Kresser, J.V.; Savage, J.W.; Selan, J.C.

    1984-01-01

    This report documents technical evaluations on various aspects pertaining to the seven main transformer failures at the North Anna Power Station, Units 1 and 2. These reports cover the subjects of Probability Risk Assessment (PRA), Failure Modes and Effects Analysis (FMEA), Root Causes, Protection Systems, Modifications, Failure Statistics, and Generic Aspects. The PRA determined that the contribution from a main transformer failure affecting plant safety systems so as to increase the risk to the public health and safety is negligible. The FMEA determined that a main transformer failure can have primary and secondary effects on plant safety system operation. The evaluation of the Root Causes found that no single common cause contributed to the seven failures. Each failure was found to have specific circumstances for initiating the failure. Both the generator and transformer primary protection systems were found to perform correctly and were designed within industry standards and practices. The proposed modifications resulting from the analyses of the failures will improve system reliability and integrity, and will reduce potentially damaging effects. The failure statistic survey found very limited data bases from which a meaningful correlation could be ascertained. The statistical comparison found no appreciable anomalies with the NAPS failures. The evaluation of all the available information and the results of the separate reports on the main transformer failures found that several generic concerns exist

  3. Draft environmental statement related to the proposed Jamesport Nuclear Power Station, Units 1 and 2: (Docket Nos. STN-50-516 and STN-50-517)

    International Nuclear Information System (INIS)

    1975-02-01

    The proposed action is the issuance of construction permits to the Long Island Lighting Company for the construction of the Jamesport Nuclear Power Station, Units 1 and 2, located on Long Island Sound in the Town of Riverhead, New York. Operation of the proposed once-through cooling system will result in the heating of 4180 cfs of water by 18/degree/F. Phytoplankton, zooplankton, and ichthyoplankton will be entrained by the cooling system. The organisms in approximately 40 /times/ 10 9 ft 3 of water per year will suffer direct mortality due to chlorination and heat shock. The risk associated with accidental radiation exposure will be very low. A bottom area of some 105.5 acres will be affected by dredging and jetty construction. Of this total, 4.35 acres will be permanently replaced by jetties, and 101.15 acres will be temporarily (a total of four years) disrupted by dredging. This impact will be temporary, since the dredged areas will be recolonized by the benthic community upon completion of work. There is a potential for substantial impingement loss of fishes on the intake screens which will require additional data to quantify. Approximately 39 miles of transmission lines will be constructed. Ninety-two percent of the total routings utilize existing rights-of-way, railroad rights-of-way, or new rights-of-way immediately adjacent to railroad rights-of-way. The rights-of-way will require approximately 621 acres. 65 refs., 64 tabs

  4. Approach and results of the PWR low power and shutdown accident frequencies program - Coarse screening analysis for Surry

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Luckas, W.; Wong, S.M.; Fitzpatrick, R.G.

    1991-01-01

    Traditionally, probabilistic risk analyses of severe accidents in nuclear power plants have limited themselves to consideration of the set of initiating events occurring during full power operation. However, some analyses of accident initiators during low power, shutdown, and other modes of plant operation other than full power have been performed. These studies as well as the Chernobyl accident and recent operating experience at US pressurized water reactors (PWRs) suggested that risks during low power and shutdown could be significant. As such, the analysis of the frequencies, consequences, and risks of these accidents was identified as one task in the Nuclear Regulatory Commission staff's study of the implications of the Chernobyl accident to US commercial nuclear power plants. This program is an ongoing high priority effort at Brookhaven National Laboratory (BNL). The scope includes a Level 1 probabilistic risk assessment (PRA) with internal fire and flood for Surry Unit 1 (PWR). This program is also closely coupled to a parallel project for the Grand Gulf plant (BWWR) being conducted by SNL. The program is being performed in two phases. Phase 1 represents a coarse screening analysis to identify dominant accident scenarios as well as risk dominant plant configurations and plant operating states. In Phase 2, a detailed PRA will be performed for the dominant accident scenarios/operating states identified in Phase 1. The objectives, results and insights of Phase 1 are discussed in the paper

  5. A briefing paper for the status of the flue gas desulfurization system at Indianapolis Power ampersand Light Company Petersburg Station Units 1 and 2

    International Nuclear Information System (INIS)

    Rutledge, C.K.; Wolsiffer, S.R.; Gray, S.M.; Martin, J.E.; Wedig, C.P.

    1992-01-01

    This paper presents a brief description of the status of the retrofit wet limestone flue gas desulfurization system project at Indianapolis Power ampersand Light Company (IPL) Petersburg Units 1 and 2. This project was initiated by IPL in response to the Clean Air Act of 1990 and is intended to treat the flue gas from two base load units with a combined capacity of approximately 700 MW gross electrical output

  6. Safety evaluation report related to the operation of Grand Gulf Nuclear Station, Units 1 and 2. Dockets Nos. 50-416 and 50-417, Mississippi Power and Light Company; Middle South Energy, Inc., South Mississippi Electric Power Association

    International Nuclear Information System (INIS)

    1982-06-01

    Supplement 2 to the Safety Evaluation Report for Mississippi Power and Light Company, et. al, joint application for licenses to operate the Grand Gulf Nuclear Station, Units 1 and 2, located on the east bank of the Mississippi River near Port Gibson, in Claiborne County, Mississippi, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  7. Technical evaluation of the proposed design modifications and technical specification changes on grid voltage degradation (Part A) for the Pilgrim Nuclear Power Station, Unit 1

    International Nuclear Information System (INIS)

    White, R.L.

    1980-01-01

    This report documents the technical evaluation of the proposed design modifications and Technical Specification changes for protection of Class 1E equipment from grid voltage degradation for the Pilgrim Nuclear Power Station. The review criteria are based on several IEEE standards and the Code of Federal Regulations. The evaluation compares the submittals made by the licensee with the NRC staff positions and the review criteria and presents the reviewer's conclusion on the acceptability of the proposed system

  8. Final environmental statement related to the operation of North Anna Power Station, Units 1 and 2: (Docket Nos. 50-338 and 50-339)

    International Nuclear Information System (INIS)

    1980-08-01

    The proposed action is the issuance of Operating Licenses to the Virginia Electric and Power Company for the startup and operation of the North Anna Power Station, Units No. 1 and 2, located on Lake Anna in Louisa County, 40 miles east of Charlottesville, Virginia. The information in this second addendum responds to the Commission's directive that the staff address in narrative form the environmental dose commitments and health effects from fuel cycle releases, fuel cycle socioeconomic impacts, and possible cumulative impacts pending further treatment by rulemaking

  9. Power stations

    International Nuclear Information System (INIS)

    Cawte, H.; Philpott, E.F.

    1980-01-01

    The object is to provide a method of operating a dual purpose power station so that the steam supply system is operated at a high load factor. The available steam not required for electricity generation is used to provide process heat and the new feature is that the process plant capacity is determined to make the most economic use of the steam supply system, and not to match the passout capacity of the turbine of the turbogenerator. The product of the process plant should, therefore, be capable of being stored. A dual-purpose power station with a nuclear-powered steam source, turbogenerating means connected to the steam source and steam-powered process plant susceptible to wide variation in its rate of operation is described. (U.K.)

  10. Integrated safety assessment report: Integrated Safety Assessment Program: Millstone Nuclear Power Station, Unit 1 (Docket No. 50-245): Draft report

    International Nuclear Information System (INIS)

    1987-04-01

    The Integrated Safety Assessment Program (ISAP) was initiated in November 1984, by the US Nuclear Regulatory Commission to conduct integrated assessments for operating nuclear power reactors. The integrated assessment is conducted in a plant-specific basis to evaluate all licensing actions, licensee initiated plant improvements and selected unresolved generic/safety issues to establish implementation schedules for each item. In addition, procedures will be established to allow for a periodic updating of the schedules to account for licensing issues that arise in the future. This report documents the review of Millstone Nuclear Power Station, Unit No. 1, operated by Northeast Nuclear Energy Company (located in Waterford, Connecticut). Millstone Nuclear Power Station, Unit No. 1, is one of two plants being reviewed under the pilot program for ISAP. This report indicates how 85 topics selected for review were addressed. This report presents the staff's recommendations regarding the corrective actions to resolve the 85 topics and other actions to enhance plant safety. The report is being issued in draft form to obtain comments from the licensee, nuclear safety experts, and the Advisory Committee for Reactor Safeguards (ACRS). Once those comments have been resolved, the staff will present its positions, along with a long-term implementation schedule from the licensee, in the final version of this report

  11. Safety evaluation report related to the operation of Susquehanna Steam Electric Station, Units 1 and 2. Docket Nos. 50-387 and 50-388, Pennsylvania Power and Light Company and Allegheny Electric Cooperative, Inc

    International Nuclear Information System (INIS)

    1982-11-01

    In April 1981, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0776) regarding the application of the Pennsylvania Power and Light Company (the licensee) and the Allegheny Electric Cooperative, Inc. (co-licensee) for licenses to operate the Susquehanna Steam Electric Station, Units 1 and 2, located on a site in Luzerne County, Pennsylvania. Supplement 1, issued in June 1981, addressed outstanding issues. Supplement 2, issued in September 1981, contains the ACRS Report and responses. Supplement 3, issued in July 1982, contains the resolution to five items previously identified as open and closes them out. On July 17, 1982, License NPF-14 was issued to allow Unit 1 operation at power levels not to exceed 5% of rated power. This supplement discusses the resolution of several license conditions that have been met

  12. Evaluation of River Bend Station Unit 1 Technical Specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-08-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the River Bend Station Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the requirements of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the River Bend T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The River Bend Station Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  13. Operation of Grand Gulf Nuclear Station, Units 1 and 2, Dockets Nos. 50-416 and 50-417: Mississippi Power and Light Company, Middle South Energy, Inc., South Mississippi Electric Power Association. Final environmental statement

    International Nuclear Information System (INIS)

    1981-09-01

    The information in this Final Environmental Statement is the second assessment of the environmental impacts associated with the construction and operation of the Grand Gulf Nuclear Station, Units 1 and 2, located on the Mississippi River in Claiborne County, Mississippi. The Draft Environmental Statement was issued in May 1981. The first assessment was the Final Environmental Statement related to construction, which was issued in August 1973 prior to issuance of the Grand Gulf Nuclear Station construction permits. In September 1981 Grand Gulf Unit 1 was 92% complete and Unit 2 was 22% complete. Fuel loading for Unit 1 is scheduled for December 1981. The present assessment is the result of the NRC staff review of the activities associated with the proposed operation of the Station, and includes the staff responses to comments on the Draft Environmental Statement

  14. Safety Evaluation Report related to the restart of Davis-Besse Nuclear Power Station, Unit 1, following the event of June 9, 1985 (Docket No. 50-346)

    International Nuclear Information System (INIS)

    1986-06-01

    On June 9, 1985, the Davis-Besse Nuclear Power Station, operated by the Toledo Edison Company, experienced a partial loss of main feedwater while the plant was at 90% power. The ensuing reactor trip was followed by spurious isolation of the steam geneators which initiated a chain of events involving a number of equipment malfunctions and several operator errors ultimately interrupting all feedwater for a short period of time. By the time operators were able to restore feedwater, both steam generators had dried out. A letter from the Director of the Office of Nuclear Reactor Regulation, pursuant to 10 CFR 50.54(f) of the Commission's regulations, confirmed that the Davis-Besse facility would not be restarted without NRC approval. The letter also requested that Toledo Edison submit its program for resolving numerous concerns identified by the staff. In response, the license submitted the Davis-Besse Course of Action report. The staff has reviewed that document and other supporting material submitted by the licensee; the staff's evaluation of that information is presented in this report

  15. Virginia power nuclear power station engineer training program

    International Nuclear Information System (INIS)

    Williams, T.M.; Haberstroh-Timpano, S.

    1987-01-01

    In response to the Institute of Nuclear Power Operations (INPO) accreditation requirements for technical staff and manager, Virginia Power developed the Nuclear Power Station Engineer Training Programs (NPSETP). The NPSETP is directed toward enhancing the specific knowledge and skills of company engineers, especially newly hired engineers. The specific goals of the program are to promote safe and reliable plant operation by providing engineers and appropriate engineering technicians with (1) station-specific basic skills; (2) station-specific specialized skills in the areas of surveillance and test, plant engineering, nuclear safety, and in-service inspection. The training is designed to develop, maintain, and document through demonstration the required knowledge and skills of the engineers in the identified groups at North Anna and Surry Power Stations. The program responds to American National Standards Institute, INPO, and US Nuclear Regulatory Commission standards

  16. Assessment of the potential for high-pressure melt ejection resulting from a Surry station blackout transient

    International Nuclear Information System (INIS)

    Knudson, D.L.; Dobbe, C.A.

    1993-11-01

    Containment integrity could be challenged by direct heating associated with a high pressure melt ejection (HPME) of core materials following reactor vessel breach during certain severe accidents. Intentional reactor coolant system (RCS) depressurization, where operators latch pressurizer relief valves open, has been proposed as an accident management strategy to reduce risks by mitigating the severity of HPME. However, decay heat levels, valve capacities, and other plant-specific characteristics determine whether the required operator action will be effective. Without operator action, natural circulation flows could heat ex-vessel RCS pressure boundaries (surge line and hot leg piping, steam generator tubes, etc.) to the point of failure before vessel breach, providing an alternate mechanism for RCS depressurization and HPME mitigation. This report contains an assessment of the potential for HPME during a Surry station blackout transient without operator action and without recovery. The assessment included a detailed transient analysis using the SCDAP/RELAP5/MOD3 computer code to calculate the plant response with and without hot leg countercurrent natural circulation, with and without reactor coolant pump seal leakage, and with variations on selected core damage progression parameters. RCS depressurization-related probabilities were also evaluated, primarily based on the code results

  17. Snubber reduction program at the Byron Station, Unit 1

    International Nuclear Information System (INIS)

    Arterburn, J.; Bakhtiari, S.

    1987-01-01

    Commonwealth Edison Company's (CECo's) Byron Station, unit 1, was originally designed with approximately 1200 snubbers supporting the plant's large- and small-bore piping systems. This relatively large number of snubbers is attributed to excessive conservatism in nuclear piping codes and regulations effective during the original piping design. A recent pilot program at CECo's LaSalle County Station, a boiling water reactor plant, demonstrated that a 50% or greater reduction in total snubber population is achievable in plants of this design vintage. Based on the successful results of the pilot program, CECo initiated a full scale snubber reduction program at Byron, a pressurized water reactor plant of the same vintage at the LaSalle County Station. The benefits from a reduced snubber population are described. To realize the maximum potential benefits, all snubbers in the plant were prioritized in order of desirability for removal. The priority designations are discussed. The major results from phase 1 of the Byron program are summarized. The NRC inspection of the project addressed a variety of issues and is discussed. The conclusions that can be drawn from the phase 1 program are summarized

  18. Safety evaluation report related to the operation of Catawba Nuclear Station, Units 1 and 2. Docket Nos. 50-413 and 50-414, Duke Power Company, et al

    International Nuclear Information System (INIS)

    1983-02-01

    The Safety Evaluation Report for the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Electric Membership Corporation, and Saluda River Electric Cooperative, Inc. as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  19. MINAC radiography performed on susquehanna Steam Electric Station Unit 1

    International Nuclear Information System (INIS)

    Bognet, J.C.

    1986-01-01

    Ten welds were volumetrically examined with a manual and automated ultrasonic (UT) system during a Susquehanna Steam Electric Station (SES) Unit 1 preservice inspection. The automated system had been recently developed and several problems were encountered in this first field application. The ten welds examined had a Sweepolet-to-Risor weld configuration, which further complicated the examination effort. This weld configuration has corrosion-resistant cladding applied to the outside and inside circumference and, as a result of an installation/removal/reinstallation sequence during plant construction, is often referred to as the double weld. After several attempts to obtain interpretable UT data failed (e.g., repeatable data), the examination effort was terminated. PP and L opted to pursue using the Miniature Linear Accelerator (MINAC) to perform radiographic examination. The results were referenced in the Susquehanna SES Unit 1 outage summary report and submitted to the NRC. The total effort was viewed as a complete success with no impact to the overall outage duration. All welds previously attempted by automated and manual UT were successfully examined using the MINAC

  20. Black Fox Station, Units 1 and 2. Application for construction permits and operating licenses

    International Nuclear Information System (INIS)

    1975-01-01

    An application to construct and operate Black Fox Station, Units 1 and 2, is presented. The two BWR type reactors will have a rated core thermal power of 3579 MW(t) and a net electrical power of approximately 1150 MW(e). The facility will be located in Inola Township, 23 miles east of Tulsa on the east side of the Verdigris River in Rogers County, Oklahoma

  1. 75 FR 36700 - Exelon Generation Company, LLC; Three Mile Island Nuclear Station, Unit 1; Environmental...

    Science.gov (United States)

    2010-06-28

    ...; Three Mile Island Nuclear Station, Unit 1; Environmental Assessment and Finding of No Significant Impact... Company, LLC (the licensee), for operation of Three Mile Island Nuclear Station, Unit 1 (TMI-1), located... Three Mile Island Nuclear Station, Units 1 and 2, NUREG-0552, dated December 1972, and Generic...

  2. Analysis of internal events for the Unit 1 of the Laguna Verde nuclear power station; Analisis de eventos internos para la Unidad 1 de la Central Nucleolelectrica de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Huerta B, A.; Aguilar T, O.; Nunez C, A.; Lopez M, R. [Comision Nacional de Seguridad Nuclear y Salvaguardias, 03000 Mexico D.F. (Mexico)

    1993-07-01

    This volume presents the results of the starter event analysis and the event tree analysis for the Unit 1 of the Laguna Verde nuclear power station. The starter event analysis includes the identification of all those internal events which cause a disturbance to the normal operation of the power station and require mitigation. Those called external events stay beyond the reach of this study. For the analysis of the Laguna Verde power station eight transient categories were identified, three categories of loss of coolant accidents (LOCA) inside the container, a LOCA out of the primary container, as well as the vessel break. The event trees analysis involves the development of the possible accident sequences for each category of starter events. Events trees by systems for the different types of LOCA and for all the transients were constructed. It was constructed the event tree for the total loss of alternating current, which represents an extension of the event tree for the loss of external power transient. Also the event tree by systems for the anticipated transients without scram was developed (ATWS). The events trees for the accident sequences includes the sequences evaluation with vulnerable nucleus, that is to say those sequences in which it is had an adequate cooling of nucleus but the remoting systems of residual heat had failed. In order to model adequately the previous, headings were added to the event tree for developing the sequences until the point where be solved the nucleus state. This process includes: the determination of the failure pressure of the primary container, the evaluation of the environment generated in the reactor building as result of the container failure or cracked of itself, the determination of the localization of the components in the reactor building and the construction of boolean expressions to estimate the failure of the subordinated components to an severe environment. (Author)

  3. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Main report and appendices, Volume 6, Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Brown, T.D.; Kmetyk, L.N.; Whitehead, D.; Miller, L. [Sandia National Labs., Albuquerque, NM (United States); Forester, J. [Science Applications International Corp., Albuquerque, NM (United States); Johnson, J. [GRAM, Inc., Albuquerque, NM (United States)

    1995-03-01

    Traditionally, probabilistic risk assessments (PRAS) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Recent studies and operational experience have, however, implied that accidents during low power and shutdown could be significant contributors to risk. In response to this concern, in 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The program consists of two parallel projects being performed by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). The program objectives include assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing the estimated risks with the risk associated with accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program is that of a Level-3 PRA. The subject of this report is the PRA of the Grand Gulf Nuclear Station, Unit 1. The Grand Gulf plant utilizes a 3833 MWt BUR-6 boiling water reactor housed in a Mark III containment. The Grand Gulf plant is located near Port Gibson, Mississippi. The regime of shutdown analyzed in this study was plant operational state (POS) 5 during a refueling outage, which is approximately Cold Shutdown as defined by Grand Gulf Technical Specifications. The entire PRA of POS 5 is documented in a multi-volume NUREG report (NUREG/CR-6143). The internal events accident sequence analysis (Level 1) is documented in Volume 2. The Level 1 internal fire and internal flood analyses are documented in Vols 3 and 4, respectively.

  4. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Main report and appendices, Volume 6, Part 1

    International Nuclear Information System (INIS)

    Brown, T.D.; Kmetyk, L.N.; Whitehead, D.; Miller, L.; Forester, J.; Johnson, J.

    1995-03-01

    Traditionally, probabilistic risk assessments (PRAS) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Recent studies and operational experience have, however, implied that accidents during low power and shutdown could be significant contributors to risk. In response to this concern, in 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The program consists of two parallel projects being performed by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). The program objectives include assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing the estimated risks with the risk associated with accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program is that of a Level-3 PRA. The subject of this report is the PRA of the Grand Gulf Nuclear Station, Unit 1. The Grand Gulf plant utilizes a 3833 MWt BUR-6 boiling water reactor housed in a Mark III containment. The Grand Gulf plant is located near Port Gibson, Mississippi. The regime of shutdown analyzed in this study was plant operational state (POS) 5 during a refueling outage, which is approximately Cold Shutdown as defined by Grand Gulf Technical Specifications. The entire PRA of POS 5 is documented in a multi-volume NUREG report (NUREG/CR-6143). The internal events accident sequence analysis (Level 1) is documented in Volume 2. The Level 1 internal fire and internal flood analyses are documented in Vols 3 and 4, respectively

  5. Surry Power Station, Units 1 and 2. Annual operating report: January--December 1977, volume I--introduction, summary of operating experience; changes, tests, experiments, and safety-related maintenance; effluent releases; data tabulations

    International Nuclear Information System (INIS)

    1978-01-01

    A chronological operating sequence including shutdowns and occurrences during the year which required load reductions or resulted in non-load related incidents is given. Data are presented concerning plant and procedure changes, tests, experiments, safety related maintenance, effluent releases and personnel radiation exposures

  6. 78 FR 77726 - Exelon Generation Company, LLC Three Mile Island Nuclear Station, Unit 1

    Science.gov (United States)

    2013-12-24

    ... Three Mile Island Nuclear Station, Unit 1 AGENCY: Nuclear Regulatory Commission. ACTION: Exemption... License No. DPR-50, which authorizes operation of the Three Mile Island Nuclear Station, Unit 1 (TMI-1... Facility Operating License No. DPR-50, which authorizes operation of the Three Mile Island Nuclear Station...

  7. 76 FR 40754 - Duke Energy Carolinas, LLC Catawba Nuclear Station, Units 1 and 2; McGuire Nuclear Station, Units...

    Science.gov (United States)

    2011-07-11

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0100; Docket Nos. 50-413 and 50-414; Docket Nos. 50-369 and 50-370; Docket Nos. 50-269, 50-270, And 50-287] Duke Energy Carolinas, LLC Catawba Nuclear Station, Units 1 and 2; McGuire Nuclear Station, Units 1 and 2; Oconee Nuclear Station, Units 1, 2, and 3; Notice...

  8. 76 FR 24538 - Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; McGuire Nuclear Station...

    Science.gov (United States)

    2011-05-02

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-413 and 50-414; NRC-2011-0100; Docket Nos. 50-369 and 50-370; Docket Nos. 50-269, 50-270, and 50-287] Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; McGuire Nuclear Station, Units 1 and 2; Oconee Nuclear Station, Units 1, 2, and 3...

  9. IAEA International Peer Review Mission on Mid-and-Long-Term Roadmap Towards the Decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Station Units 1-4, Tokyo and Fukushima Prefecture, Japan, 15-22 April 2013. Mission Report

    International Nuclear Information System (INIS)

    2013-01-01

    Following the accident at TEPCO's Fukushima Daiichi Nuclear Power Station (NPS) on 11 March 2011, the ''Mid-and-Long-Term Roadmap towards the Decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Station Units 1-4'' was adopted by the Government of Japan and TEPCO Council on Mid-to-Long-Term Response for Decommissioning in December 2011 and revised in July 2012. The Roadmap, which is scheduled for an additional update in June 2013, describes the main steps and activities to be implemented for the decommissioning of the Fukushima Daiichi NPS through the combined efforts of the Government of Japan and TEPCO. Within the framework of the IAEA Action Plan on Nuclear Safety, the Government of Japan invited the IAEA to conduct an independent peer review of the Roadmap with two main objectives: - To improve the decommissioning planning and the implementation of pre-decommissioning activities at TEPCO's Fukushima Daiichi NPS; and - To share with the international community the good practices and lessons learned by the review. The review has been organized in two steps, and the IAEA conducted the first part in Japan from 15 to 22 April 2013. The objective of the first mission was to undertake an initial review of the Roadmap, including assessments of decommissioning strategy, planning and timing of decommissioning phases and a review of several specific short-term issues and recent challenges. Specifically, it covered the assessment of current reactor conditions, assessment of management of radioactive releases and associated doses, control of radioactive exposure of employees and decontamination within the site for improvement of working environment, structural integrity of reactor buildings and other constructions. The incidents recently experienced at the site, related with failures of the power supply and leakages of water from the underground reservoirs, were also included in the review of the specific short-term issues. The Government of Japan and TEPCO have

  10. Analysis of internal events for the Unit 1 of the Laguna Verde Nuclear Power Station. Appendixes; Analisis de eventos internos para la Unidad 1 de la Central Nucleoelectrica de Laguna Verde. Apendices

    Energy Technology Data Exchange (ETDEWEB)

    Huerta B, A; Lopez M, R [Comision Nacional de Seguridad Nuclear y Salvaguardias, 03000 Mexico D.F. (Mexico)

    1995-07-01

    This volume contains the appendices for the accident sequences analysis for those internally initiated events for Laguna Verde Unit 1, Nuclear Power Plant. The appendix A presents the comments raised by the Sandia National Laboratories technical staff as a result of the review of the Internal Event Analysis for Laguna Verde Unit 1 Nuclear Power Plant. This review was performed during a joint Sandia/CNSNS multi-day meeting by the end 1992. Also included is a brief evaluation on the applicability of these comments to the present study. The appendix B presents the fault tree models printed for each of the systems included and.analyzed in the Internal Event Analysis for LVNPP. The appendice C presents the outputs of the TEMAC code, used for the cuantification of the dominant accident sequences as well as for the final core damage evaluation. (Author)

  11. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Supporting MELCOR calculations, Volume 6, Part 2

    International Nuclear Information System (INIS)

    Kmetyk, L.N.; Brown, T.D.

    1995-03-01

    To gain a better understanding of the risk significance of low power and shutdown modes of operation, the Office of Nuclear Regulatory Research at the NRC established programs to investigate the likelihood and severity of postulated accidents that could occur during low power and shutdown (LP ampersand S) modes of operation at commercial nuclear power plants. To investigate the likelihood of severe core damage accidents during off power conditions, probabilistic risk assessments (PRAs) were performed for two nuclear plants: Unit 1 of the Grand Gulf Nuclear Station, which is a BWR-6 Mark III boiling water reactor (BWR), and Unit 1 of the Surry Power Station, which is a three-loop, subatmospheric, pressurized water reactor (PWR). The analysis of the BWR was conducted at Sandia National Laboratories while the analysis of the PWR was performed at Brookhaven National Laboratory. This multi-volume report presents and discusses the results of the BWR analysis. The subject of this part presents the deterministic code calculations, performed with the MELCOR code, that were used to support the development and quantification of the PRA models. The background for the work documented in this report is summarized, including how deterministic codes are used in PRAS, why the MELCOR code is used, what the capabilities and features of MELCOR are, and how the code has been used by others in the past. Brief descriptions of the Grand Gulf plant and its configuration during LP ampersand S operation and of the MELCOR input model developed for the Grand Gulf plant in its LP ampersand S configuration are given

  12. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Supporting MELCOR calculations, Volume 6, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    Kmetyk, L.N.; Brown, T.D. [Sandia National Labs., Albuquerque, NM (United States)

    1995-03-01

    To gain a better understanding of the risk significance of low power and shutdown modes of operation, the Office of Nuclear Regulatory Research at the NRC established programs to investigate the likelihood and severity of postulated accidents that could occur during low power and shutdown (LP&S) modes of operation at commercial nuclear power plants. To investigate the likelihood of severe core damage accidents during off power conditions, probabilistic risk assessments (PRAs) were performed for two nuclear plants: Unit 1 of the Grand Gulf Nuclear Station, which is a BWR-6 Mark III boiling water reactor (BWR), and Unit 1 of the Surry Power Station, which is a three-loop, subatmospheric, pressurized water reactor (PWR). The analysis of the BWR was conducted at Sandia National Laboratories while the analysis of the PWR was performed at Brookhaven National Laboratory. This multi-volume report presents and discusses the results of the BWR analysis. The subject of this part presents the deterministic code calculations, performed with the MELCOR code, that were used to support the development and quantification of the PRA models. The background for the work documented in this report is summarized, including how deterministic codes are used in PRAS, why the MELCOR code is used, what the capabilities and features of MELCOR are, and how the code has been used by others in the past. Brief descriptions of the Grand Gulf plant and its configuration during LP&S operation and of the MELCOR input model developed for the Grand Gulf plant in its LP&S configuration are given.

  13. 76 FR 19148 - PSEG Nuclear, LLC, Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1...

    Science.gov (United States)

    2011-04-06

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-272, 50-311, 50-354; NRC-2009-0390 and NRC-2009-0391] PSEG Nuclear, LLC, Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2..., DPR-70, and DPR-75 for an additional 20 years of operation for the Hope Creek Generating Station (HCGS...

  14. Final environmental statement related to the operation of Catawba Nuclear Station, Units 1 and 2. Docket Nos. 50-413 and 50-414, Duke Power Company, et al

    International Nuclear Information System (INIS)

    1983-01-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of the Catawba Nuclear Station, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR 51, as amended, of the NRC regulations. This statement examines: the affected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic-ecological impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk associated with accidental radiation exposure is very low. The net socioeconomic effects of the project will be beneficial

  15. Radiological Effluent Technical Specifications (RETS) implementation: Zion Generating Station Units 1 and 2

    International Nuclear Information System (INIS)

    Serrano, W.; Akers, D.W.; Duce, S.W.; Mandler, J.W.; Simpson, F.B.; Young, T.E.

    1985-06-01

    A review of the Radiological Effluent Technical Specifications (RETS) of the Zion Generating Station Units 1 and 2 was performed. The principal review guidelines used were NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants,'' and Draft 7 of NUREG-0472, Revision 3, ''Radiological Effluent Technical Specifications for Pressurized Water Reactors.'' Draft submittals were discussed with the Licensee by both EG and G and the NRC staff until all items requiring changes to the Technical Specifications were resolved. The Licensee then submitted final proposed RETS to the NRC which were evaluated and found to be in compliance with the NRC review guidelines. The proposed Offsite Dose Calculation Manual was reviewed and generally found to be consistent with the NRC review guidelines. 35 refs., 2 figs., 1 tab

  16. Role of check operators in achieving operational excellence at Virginia Power's nuclear stations

    International Nuclear Information System (INIS)

    Shriver, B.L.; Williams, T.M.; Stewart, W.L.

    1987-01-01

    Virginia Power has implemented a Check Operator Program as a part of its commitment to excellence in the operation of the North Anna and Surry nuclear power stations. The Check Operator Program utilizes highly qualified licensed personnel to independently evaluate the performance of licensed operators and senior operators during normal, abnormal and simulated emergency conditions. Emphasis is placed upon individual and team performance as well as the procedures and training which support the operators. The check operators report to line management to ensure that their recommendations are implemented into the overall operations philosophy of the power station

  17. Conformance to Regulatory Guide 1.97 Slurry Power Station, Unit Nos. 1 and 2 (Docket Nos. 50-280 and 50-281)

    International Nuclear Information System (INIS)

    Stoffel, J.W.

    1985-09-01

    This EG and G Idaho, Inc., report reviews the submittals for Regulatory Guide 1.97, Revision 3, for Unit Nos. 1 and 2 of the Surry Power Station and identifies areas of nonconformance to the regulatory guide. Exceptions to Regulatory Guide 1.97 are evaluated and those areas where sufficient basis for acceptability is not provided are identified

  18. Evaluation of Perry Nuclear Power Plant Unit 1 technical specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-11-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Perry Nuclear Power Plant Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the requirements of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the Perry T/S. Several discrepancies were identified and subsequently resolved through telephone conversations with the staff reviewer and the utility representative. Pending completion of the resolutions noted in Parts 3 and 4 of this report, the Perry Nuclear Power Plant Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  19. Tobruk power station

    Energy Technology Data Exchange (ETDEWEB)

    Boergardts, B

    1978-01-01

    In February of 1975, the Electricity Corporation Benghazi (ECB) awarded a contract for the construction of a turnkey power station and seawater desalination plant in Tobruk, Libya to a consortium under the leadership of BBC Mannheim. This power station has an output of 129 MW and supplies about 24,000 m/sup 3/ of drinking water daily. It went into operation in 1977, two and a half years after the contract was awarded.

  20. Station blackout transient at the Browns Ferry Unit 1 Plant: a severe accident sequence analysis (SASA) program study

    International Nuclear Information System (INIS)

    Schultz, R.R.

    1982-01-01

    Operating plant transients are of great interest for many reasons, not the least of which is the potential for a mild transient to degenerate to a severe transient yielding core damage. Using the Browns Ferry (BF) Unit-1 plant as a basis of study, the station blackout sequence was investigated by the Severe Accident Sequence Analysis (SASA) Program in support of the Nuclear Regulatory Commission's Unresolved Safety Issue A-44: Station Blackout. A station blackout transient occurs when the plant's AC power from a comemrcial power grid is lost and cannot be restored by the diesel generators. Under normal operating conditions, f a loss of offsite power (LOSP) occurs [i.e., a complete severance of the BF plants from the Tennessee Valley Authority (TVA) power grid], the eight diesel generators at the three BF units would quickly start and power the emergency AC buses. Of the eight diesel generators, only six are needed to safely shut down all three units. Examination of BF-specific data show that LOSP frequency is low at Unit 1. The station blackout frequency is even lower (5.7 x 10 - 4 events per year) and hinges on whether the diesel generators start. The frequency of diesel generator failure is dictated in large measure by the emergency equipment cooling water (EECW) system that cools the diesel generators

  1. Start up and commercial operation of Laguna Verde nuclear power plant. Unit 1

    International Nuclear Information System (INIS)

    Torres Ramirez, J.F.

    1991-01-01

    Prior to start up of Laguna Verde nuclear power plant preoperational tests and start tests were performed and they are described in its more eminent aspects. In relation to commercial operation of nuclear station a series of indicator were set to which allow the measurement of performance in unit 1, in areas of plant efficiency and personal safety. Antecedents. Laguna Verde station is located in Alto Lucero municipality in Veracruz state, 70 kilometers north-northeast from port of Veracruz and a 290 kilometers east-northeast from Mexico city. The station consist of two units manufactured by General Electric, with a nuclear system of vapor supply also called boiling water (BWR/5), and with a system turbine-generator manufactured by Mitsubishi. Each unit has a nominal power of 1931 MWt and a level design power of 675 Mwe and a net power of 654 Electric Megawatts

  2. Technical specifications: Seabrook Station, Unit 1 (Docket No. 50-443)

    International Nuclear Information System (INIS)

    1990-03-01

    The Seabrook Station, Unit 1 Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  3. Oconee Nuclear Station, Units 1, 2, and 3. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Information is presented concerning operations, performance characteristics, changes, tests, inspections, containment leak tests, maintenance, primary coolant chemistry, station staff changes, reservoir investigations, plume mapping, and operational environmental radioactivity monitoring data for oconee Units 1, 2, and 3. The non-radiological environmental surveillance program is also described. (FS)

  4. 76 FR 24064 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Notice...

    Science.gov (United States)

    2011-04-29

    ... Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Notice of Issuance of Renewed... Company (licensee), the operator of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (PVNGS... Plants: Supplement 43, Regarding Palo Verde Nuclear Generating Station,'' issued January 2011, discusses...

  5. The nuclear power station

    International Nuclear Information System (INIS)

    Plettner, B.

    1987-04-01

    The processes taking place in a nuclear power plant and the dangers arising from a nuclear power station are described. The means and methods of controlling, monitoring, and protecting the plant and things that can go wrong are presented. There is also a short discourse on the research carried out in the USA and Germany, aimed at assessing the risks of utilising nuclear energy by means of the incident tree analysis and probability calculations. (DG) [de

  6. Power station instrumentation

    International Nuclear Information System (INIS)

    Jervis, M.W.

    1993-01-01

    Power stations are characterized by a wide variety of mechanical and electrical plant operating with structures, liquids and gases working at high pressures and temperatures and with large mass flows. The voltages and currents are also the highest that occur in most industries. In order to achieve maximum economy, the plant is operated with relatively small margins from conditions that can cause rapid plant damage, safety implications, and very high financial penalties. In common with other process industries, power stations depend heavily on control and instrumentation. These systems have become particularly significant, in the cost-conscious privatized environment, for providing the means to implement the automation implicit in maintaining safety standards, improving generation efficiency and reducing operating manpower costs. This book is for professional instrumentation engineers who need to known about their use in power stations and power station engineers requiring information about the principles and choice of instrumentation available. There are 8 chapters; chapter 4 on instrumentation for nuclear steam supply systems is indexed separately. (Author)

  7. Quad-Cities Station, Units 1 and 2. Annual report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated by Unit 1 was 2,246,757 MWh(e) with the generator on line 4,287.5 hrs while Unit 2 generated 1,729,147 MWh(e) with the generator on line 3,056.21 hrs. Information is presented concerning operations, power generation, shutdowns, maintenance, changes, tests, and experiments

  8. Quad-Cities Station, Units 1 and 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated by Unit 1 was 3,393,062 MWH with the generator on line 5,703.0 hrs. Unit 2 generated 4,304,684 MWH with the generator on line 7,145.3 hrs. Information is presented concerning modifications, maintenance, power generation, shutdowns, occupational radiation exposures, and organization

  9. Experiments to investigate direct containment heating phenomena with scaled models of the Surry Nuclear Power Plant

    International Nuclear Information System (INIS)

    Blanchat, T.K.; Allen, M.D.; Pilch, M.M.

    1994-01-01

    The Containment Technology Test Facility (CTTF) and the Surtsey Test Facility at Sandia National Laboratories (SNL) are used to perform scaled experiments for the Nuclear Regulatory Commission (NRC) that simulate High Pressure Melt Ejection (HPME) accidents in a nuclear power plant (NPP). These experiments are designed to investigate the effects of direct containment heating (DCH) phenomena on the containment load. High-temperature, chemically reactive melt is ejected by high-pressure steam into a scale model of a reactor cavity. Debris is entrained by the steam blowdown into a containment model where specific phenomena, such as the effect of subcompartment structures, prototypic atmospheres, and hydrogen generation and combustion, can be studied

  10. Audit of Wolf Creek Generating Station, Unit 1 technical specifications. Final technical evaluation report

    International Nuclear Information System (INIS)

    Stromberg, H.M.

    1985-07-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Wolf Creek Generating Station Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the assumptions of the Final Safety Analysis Report (FSAR) as amended, the requirements of the Safety Evaluation Report (SER) as supplemented, and the Comments and Responses to the Wolf Creek Technical Specification Draft Inspection Report. A comparative audit of the FSAR as amended, the SER as supplemented, and the Draft Inspection Report was performed with the Wolf Creek T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The Wolf Creek Generating Station Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR, SER, and Draft Inspection Report

  11. Technical Specifications, Comanche Peak Steam Electric Station, Unit 1 (Docket No. 50-445)

    International Nuclear Information System (INIS)

    1990-04-01

    The Technical Specifications for Comanche Peak Steam Electric Station, Unit 1 were prepared by the US Nuclear Regulatory Commission. They set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility, as set forth in Section 50.36 of Title 10 of the Code of Federal Regulations Part 50, for the protection of the health and safety of the public

  12. Design and operation of the Surry Radwaste Facility

    International Nuclear Information System (INIS)

    Morris, L.L.; Halverson, W.C.

    1993-01-01

    In September 1991, Virginia Power started processing radioactive waste with a new Radwaste Facility at the Surry Power Station near Norfolk, Virginia. The Surry Radwaste Facility (SRF) was designed to process and store liquid waste, laundry waste, dry active waste, radioactive filters and spent ion-exchange resin. It also provides on-site decontamination services and a fully equipped hot machine shop. The NRC has recognized that the amount of planning and design, and the attention to detail, that was expended on the SRF Project in order to minimize personnel exposure and ensure efficient operation, is a licensee strength. Through its first year of operation, the facility has proven very successful. Using evaporation and demineralization, over 30 million liters of liquid have been released with no chemical impurities or detectable radioactivity (excluding tritium). Over 623,000 liters of concentrated boric acid waste liquid have been processed with the Bitumen Solidification System yielding 139,880 liters (660 drums) of low level Class A-Stable waste. Additional economic benefits will be realized as the effectiveness of the processing systems continues to improve due to increased operational experience and ergonomics

  13. 75 FR 15745 - Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-03-30

    ...] Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Exemption 1.0 Background The Arizona Public Service Company (APS, the licensee) is the holder of Facility... Generating Station (PVNGS), Units 1, 2, and 3, respectively. The licenses provide, among other things, that...

  14. 75 FR 8149 - Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-02-23

    ...] Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3... NPF-74, issued to the Arizona Public Service Company (APS, or the licensee), for operation of the Palo Verde Nuclear Generating Station (PVNGS, the facility), Units 1, 2, and 3, respectively, located in...

  15. 75 FR 43572 - Duke Energy Carolinas, LLC, McGuire Nuclear Station, Units 1 and 2; Environmental Assessment and...

    Science.gov (United States)

    2010-07-26

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-369 and 50-370; NRC-2010-0259] Duke Energy Carolinas, LLC, McGuire Nuclear Station, Units 1 and 2; Environmental Assessment and Finding of No Significant... Energy Carolinas, LLC (the licensee), for operation of the McGuire Nuclear Station, Units 1 and 2...

  16. 75 FR 43571 - Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; Environmental Assessment And...

    Science.gov (United States)

    2010-07-26

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-413 and 50-414; NRC-2010-0260] Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; Environmental Assessment And Finding of No Significant... Energy Carolinas, LLC (the licensee), for operation of the Catawba Nuclear Station, Units 1 and 2...

  17. Quad-Cities Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 2,024,125 net electrical MWH and the generator was on line 3162.6 hours. Unit 2 generated 746,184 net electrical MWH and was on line 1475.3 hrs. Data is included concerning operations, power generation, shutdowns, maintenance, changes, and tests. (FS)

  18. Technical evaluation of RETS-required reports for Rancho Seco Nuclear Generating Station, Unit 1 for 1983

    International Nuclear Information System (INIS)

    Magleby, E.H.; Young, T.E.

    1985-01-01

    A review of the reports required by Federal regulations and the plant-specific Radiological Effluent Technical Specifications (RETS) for operations conducted during 1983 was performed. The periodic reports reviewed for the Rancho Seco Nuclear Generating Station, Unit 1 were the Semiannual Effluent Release Report, January 1, 1983 to June 30, 1983 and the Radiation Exposure, Environmental Protection, Effluent and Waste Disposal Report. The principal review guidelines were the plant's specific RETS which were based on NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably complete and consistent with the review guidelines

  19. System Definition Document: Reactor Data Necessary for Modeling Plutonium Disposition in Catawba Nuclear Station Units 1 and 2

    International Nuclear Information System (INIS)

    Ellis, R.J.

    2000-01-01

    The US Department of Energy (USDOE) has contracted with Duke Engineering and Services, Cogema, Inc., and Stone and Webster (DCS) to provide mixed-oxide (MOX) fuel fabrication and reactor irradiation services in support of USDOE's mission to dispose of surplus weapons-grade plutonium. The nuclear station units currently identified as mission reactors for this project are Catawba Units 1 and 2 and McGuire Units 1 and 2. This report is specific to Catawba Nuclear Station Units 1 and 2, but the details and materials for the McGuire reactors are very similar. The purpose of this document is to present a complete set of data about the reactor materials and components to be used in modeling the Catawba reactors to predict reactor physics parameters for the Catawba site. Except where noted, Duke Power Company or DCS documents are the sources of these data. These data are being used with the ORNL computer code models of the DCS Catawba (and McGuire) pressurized-water reactors

  20. Wind turbine power stations

    International Nuclear Information System (INIS)

    Anon.

    1992-11-01

    The Countryside Council for Wales (CCW's) policy on wind turbine power stations needs to be read in the context of CCW's document Energy:Policy and perspectives for the Welsh countryside. This identifies four levels of action aimed at reducing emission of gases which contribute towards the risk of global warming and gases which cause acid deposition. These are: the need for investment in energy efficiency; the need for investment in conventional power generation in order to meet the highest environmental standards; the need for investment in renewable energy; and the need to use land use transportation policies and decisions to ensure energy efficiency and energy conservation. CCW views wind turbine power stations, along with other renewable energy systems, within this framework. CCW's policy is to welcome the exploitation of renewable energy sources as an element in a complete and environmentally sensitive energy policy, subject to the Environmental Assessment of individual schemes and monitoring of the long-term impact of the various technologies involved. (Author)

  1. Controversial power station

    International Nuclear Information System (INIS)

    Marcan, P.

    2008-01-01

    When information on plans to build a power station in Trebisov first appeared reactions differed. A 40-billion investment in a town with more than 20% unemployment seemed attractive. But some people did not like the idea of having a power plant located in the town. Around one year after the investment was officially announced TREND returned to Trebisov. In the meantime the investor has managed to overcome one of the biggest obstacles on its way to building a new power plant. The ministry responsible gave the environmental study a positive rating. But objectors are still not sure that everything is fine. They claim that the study misinterprets data and that the ministry did not show expertise when evaluating it. 'Is it possible that a coal power plant located in a town would have twice as many positive effects on peoples' health than negative ones? Why don't we build them everywhere?'asked the chairman of the civic society, Trebisov nahlas, Gejza Gore. The developer of the project, Ceskoslovenska energeticka spolocnost (CES), Kosice is fighting back and claims that their counterpart lacks professional arguments. In the meantime it is preparing for area management proceedings. Trebisov is also involved in the discussion and claims that the town planning scheme does not include such a project. The Ministry of Construction has a different opinion. In the opinion of the Ministry the town planning scheme allows a 885-megawatt power plant to be built only a few hundred meters away from housing estates. (author)

  2. Reload Startup Physics Tests for Tianwan Nuclear Power station

    International Nuclear Information System (INIS)

    Yang Xiaoqiang; Li Wenshuang; Li Youyi; Yao Jinguo; Li Zaipeng Jiangsu

    2010-01-01

    This paper briefly describes the test purposes, test items, test schedules and test equipment's for reload startup physics test's on Unit 1 and 2 of Tianwan Nuclear Power station. Then, an overview of the previous thrice tests and evaluations on the tests results are presented. In the end, the paper shows the development and work direction of optimization project for reload startup physics tests on Unit 1 and 2 of Tianwan Nuclear Power station. (Authors)

  3. Safety evaluation report related to the operation of Susquehanna Steam Electric Station, Units 1 and 2. Docket Nos. 50-387 and 50-388, Pennsylvania Power and Light Company, Allegheny Electric Cooperative, Inc

    International Nuclear Information System (INIS)

    1982-07-01

    Information is presented concerning site characteristics; design criteria for systems and components; reactor thermal and hydraulic characteristics; reactor coolant pressure boundary; engineered safety features; instrumentation and control; electrical power systems; auxiliary systems; conduct of operations; quality assurance; and TMI-2 requirements

  4. Integrated analysis of DCH in Surry

    International Nuclear Information System (INIS)

    Dingman, S.E.; Harper, F.T.; Pilch, M.M.; Washington, K.E.

    1993-01-01

    An evaluation of the key elements affecting Direct Containment Heating (DCH) was performed for the Surry plant. This involved determining the dominant high pressure core damage sequences, the probability of proceeding to vessel breach at high pressure, the DCH loads, and the containment strength. Each of these factors was evaluated separately, and then the results were combined to give the overall threat from DCH. The maximum containment failure probability by DCH for Surry is 10 -3 when considering four base DCH scenarios and using the two-cell equilibrium (TCE) model. However, higher contamination failure probabilities are estimated in sensitivity cases. When the depressurization and containment loads aspects are combined, the containment failure probability (conditional on station blackout sequence) is less than 19 -2 . CONTAIN calculations were performed to provide insights regarding DCH phenomenological uncertainties and potential conservatisms in the TCE model. The CONTAIN calculations indicated that the TCE calculations were conservative for Surry and that the dominant factors were neglect of heat transfer to surroundings and complete combustion of hydrogen on DCH time scales

  5. Indian Point Station, Unit 1 and 2. Semiannual operating report No. 24, July--December 1974

    International Nuclear Information System (INIS)

    1975-01-01

    Net electrical power generated by Unit 1 was 519,130 MWH with the reactor critical for 2,400.39 hours and the generator on line for 2,316.14 hours. Unit 2 generated 2,427,828 MWH electrical power, was critical for 3,590.31 hours and the generator was on line for 3,485.41 hours. Operations and maintenance are summarized. Information is presented concerning radioactive effluent releases, occupational personnel radiation protection, primary coolant chemistry, changes, tests, and experiments. Environmental radioactivity is discussed. (U.S.)

  6. Safety-Evaluation Report related to the operation of Grand Gulf Nuclear Station, Units 1 and 2. Docket Nos. 50-416 and 50-417

    International Nuclear Information System (INIS)

    1983-05-01

    Supplement 4 to the Safety Evaluation Report for Mississippi Power and Light Company, et. al., joint application for licenses to operate the Grand Gulf Nuclear Station, Units 1 and 2, located on the east bank of the Mississippi River near Port Gibson in Claiborne County, Mississippi, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status on the resolution of those issues that required further evaluation before authorizing operation of Unit 1 above 5% rated power and other issues that were to be evaluated during the first cycle of power operation

  7. Technical Specifications, Seabrook Station, Unit 1 (Docket No. 50-443). Appendix ''A'' to License No. NPF-56

    International Nuclear Information System (INIS)

    1986-10-01

    This report provides specifications for the Seabrook Station Unit 1 reactor concerning: safety limits and limiting safety settings; limiting conditions for operation and surveillance requirements; design features; and administrative controls

  8. Bradwell Nuclear Power Station

    International Nuclear Information System (INIS)

    1987-01-01

    When built, the Magnox reactors were expected to have operating lifetimes of 20-25 years. In order to satisfy the licensing authorities of their continued safety, long term safety reviews (LTSRs) are being carried out as the reactors reach 20 years of operation. This is the Nuclear Installations Inspectorate's (NII) summary report on Bradwell nuclear power station. The objectives of the LTSR are stated. A description of the plant is followed by an explanation of the statutory position on licensing. The responsibilities of the Central Electricity Generating Board (CEGB) and the NII are defined. From the examination of the CEGB's LTSR it is concluded that this generally confirms the validity of the existing safety case for present operation. However, some recommendations are made as to work required for reactor operation up to 1992. A summary of the NII findings is presented. This includes the reactor pressure circuit integrity, effects of ageing and in-service wear and radiation doses. (U.K.)

  9. Planning for decommissioning of Ignalina Nuclear Power Plant Unit-1

    International Nuclear Information System (INIS)

    Poskas, P.; Poskas, R.; Zujus, R.

    2002-01-01

    In accordance to Ignalina NPP Unit 1 Closure Law, the Government of Lithuania approved the Ignalina NPP Unit 1 Decommissioning Program until 2005. For enforcement of this program, the plan of measures for implementation of the program was prepared and approved by the Minister of Economy. The plan consists of two parts, namely technical- environmental and social-economic. Technical-environmental measures are mostly oriented to the safe management of spent nuclear fuel and operational radioactive waste stored at the plant and preparation of licensing documents for Unit 1 decommissioning. Social-economic measures are oriented to mitigate the negative social and economic impact on Lithuania, inhabitants of the region, and, particularly, on the staff of Ignalina NPP by means of creating favorable conditions for a balanced social and economic development of the region. In this paper analysis of planned radioactive waste management technologies, licensing documents for decommissioning, other technical-environmental and also social-economic measures is presented. Specific conditions in Lithuania important for defining the decommissioning strategy are highlighted. (author)

  10. Discharges from nuclear power stations

    International Nuclear Information System (INIS)

    1991-02-01

    HM Inspectorate of Pollution commissioned, with authorising responsibilities in England and Wales, a study into the discharges of radioactive effluents from Nuclear Power Stations. The study considered arisings from nuclear power stations in Europe and the USA and the technologies to treat and control the radioactive discharges. This report contains details of the technologies used at many nuclear power stations to treat and control radioactive discharges and gives, where information was available, details of discharges and authorised discharge limits. (author)

  11. Indian Point Station, Units 1, 2, and 3. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 remained in a shutdown condition pending a decision by the Company on the installation of an ECCS as required by NRC. Net electrical power generated by Unit 2 was 2,267,654 MWH with the unit on line 3,056.45 hrs. Unit 3 generated 1,872,947 MWH and was on line 2,286.01 hrs. Information is presented concerning operations, reportable events, corrective maintenance, fuel performance, radioactivity releases, shutdowns, primary coolant chemistry, and occupational radiation exposures

  12. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on a site in Montgomery and Chester Counties, Pennsylvania. A license for the operation of Limerick Unit 1 was issued on October 26, 1984. The license, which was restricted to a five percent power level, contained conditions which required resolution prior to proceeding beyond the five percent power level. Supplement 4, issued in May 1985, addressed some of these issues. Supplement 4 also contained the comments made by the Advisory Committee on Reactor Safeguards in its report dated November 6, 1984, regarding full power operation of Limerick Unit 1. Supplement 5, issued in July 1985, and this Supplement 6 address further issues, principally the status of offsite emergency planning, that require resolution prior to proceeding beyond the five percent power level

  13. Safety Evaluation Report related to the operation of Grand Gulf Nuclear Station, Units 1 and 2 (Docket Nos. 50-416 and 50-417). Supplement 6

    International Nuclear Information System (INIS)

    1984-08-01

    Supplement 6 to the Safety Evaluation Report for Mississippi Power and Light Company et al. joint application for licenses to operate the Grand Gulf Nuclear Station, Units 1 and 2, located on the east bank of the Mississippi River near Port Gibson in Claiborne County, Mississippi, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the NRC staff's evaluation of open items from previous supplements and Technical Specification changes required before authorizing operation of Unit 1 above 5% of rated power

  14. Safety Evaluation Report related to the operation of Grand Gulf Nuclear Station, Units 1 and 2 (Docket Nos. 50-416 and 50-417). Supplement No. 5

    International Nuclear Information System (INIS)

    1984-08-01

    Supplement 5 to the Safety Evaluation Report for Mississippi Power and Light Company, et al., joint application for licenses to operate the Grand Gulf Nuclear Station, Units 1 and 2, located on the east bank of the Mississippi River near Port Gibson in Claiborne County, Mississippi, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status on the resolution of those issues that require further evaluation before authorizing operation of Unit 1 above 5% of rated power

  15. Safety-evaluation report related to operation of McGuire Nuclear Station, Units 1 and 2. Docket Nos. 50-369 and 50-370

    International Nuclear Information System (INIS)

    1983-05-01

    This report supplements the Safety Evaluation Report Related to the Operation of McGuire Nuclear Station, Units 1 and 2 (SER (NUREG-0422)) issued in March 1978 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, as applicant and owner, for licenses to operate the McGuire Nuclear Station, Units 1 and 2 (Docket Nos. 50-369 and 50-370). The facility is located in Mecklenburg County, North Carolina, about 17 mi north-northwest of Charlotte, North Carolina. This supplement provides information related to issuance of a full-power authorization for Unit 2. The staff concludes that the McGuire Nuclear Station can be operated by the licensee without endangering the health and safety of the public

  16. Torness: proposed nuclear power station

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    The need for and desirability of nuclear power, and in particular the proposed nuclear power station at Torness in Scotland, are questioned. Questions are asked, and answered, on the following topics: position, appearance and cost of the proposed Torness plant, and whether necessary; present availability of electricity, and forecast of future needs, in Scotland; energy conservation and alternative energy sources; radiation hazards from nuclear power stations (outside, inside, and in case of an accident); transport of spent fuel from Torness to Windscale; radioactive waste management; possibility of terrorists making a bomb with radioactive fuel from a nuclear power station; cost of electricity from nuclear power; how to stop Torness. (U.K.)

  17. Safety Evaluation Report related to the operation of Byron Station, Units 1 and 2 (Docket Nos. STN 50-454 and STN 50-455). Supplement No. 7

    International Nuclear Information System (INIS)

    1986-11-01

    Supplement No. 7 to the Safety Evaluation Report related to Commonwealth Edison Company's application for licenses to operate the Byron Station, Units 1 and 2, located in Rockvale Township, Ogle County, Illinois, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement provides additional information supporting the license for initial criticality and power ascension to full-power operation for Unit 2

  18. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353)

    International Nuclear Information System (INIS)

    1989-06-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 to NUREG-0991 was issued in December 1983. Supplements 2 and 3 were issued in October 1984. License NPF-27 for the low-power operation of Limerick Unit 1 was issued on October 26, 1984. Supplement 4 was issued in May, 1985, Supplement 5 was issued in July 1985, and Supplement 6 was issued in August 1985. These supplements addressed further issues that required resolution before Unit 1 proceeded beyond the 5-percent power level. The full-power operating license for Limerick Unit 1 (NPF-39) was issued August 8, 1985, and the unit has completed two cycles of operation. Supplement 7 was issued April 1989 to address some of the few significant design differences between Units 1 and 2, the resolution of issues that remained open when the Unit 1 full-power license was issued and an assessment of some of the issues that required resolution before issuance of an operating license for Unit 2. This supplement addresses the remaining issues that required resolution before issuance of and operating license for Unit 2

  19. Islands for nuclear power stations

    International Nuclear Information System (INIS)

    Usher, E.F.F.W.; Fraser, A.P.

    1981-01-01

    The safety principles, design criteria and types of artificial island for an offshore nuclear power station are discussed with particular reference to siting adjacent to an industrial island. The paper concludes that the engineering problems are soluble and that offshore nuclear power stations will eventually be built but that much fundamental work is still required. (author)

  20. Nuclear power stations licensing

    International Nuclear Information System (INIS)

    Solito, J.

    1978-04-01

    The judicial aspects of nuclear stations licensing are presented. The licensing systems of the United States, Spain, France and Federal Republic of Germany are focused. The decree n 0 60.824 from July 7 sup(th), 1967 and the following legislation which define the systematic and area of competence in nuclear stations licensing are analysed [pt

  1. The Trencin water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Trencin water power station. The Trencin water power station was built seven years after the Dubnica nad Vahom water power station started its operation and was the last stage of the first and the oldest derived cascade of water power stations on the Vah River. After completing water power stations at Ladce (1936), Ilava (1946) and Dubnica nad Vahom (1949) and before constructing the Trencin water power station, the whole second derived cascade of water power stations including water power stations at Kostolna, Nove Mesto nad Vahom and Horna Streda was built as soon as possible mainly because the need to get compensation for discontinued electricity supplies as well as energetic coal from the Czech Republic. Hereby, experiences from the construction of previous grades were used, mainly as far as the dimensioning was concerned, as the fi rst installed power stations had, in comparison with the growing requirements on the electricity supplies, very low absorption capacity - only 150 m 3 .s -1 . Thus the Trencin power station (original name was the Skalka power station) was already dimensioned for the same absorption capacity as the cascade located downstream the river, that is 180 m 3 .s -1 . That was related also to growing demands on electricity supplies during the peaks in the daily electric system load diagram, and thus to the transfer from continuous operation of the water power station to semi-peak or even peak performance. According to the standards of power station classification, the Trencin water power station is a medium size, low pressure, channel power station with two units equipped by Kaplan turbines and synchronous hydro-alternators. The water power station installed capacity is 16.1 MW in total and its designed annual production of electrical energy for medium water year is 85,000 MWh, while the average annual production during the last 30 years is 86,252 MWh. Installed unit has a four-blade Kaplan turbine with the diameter

  2. Subsidence analysis Forsmark nuclear power plant - unit 1

    International Nuclear Information System (INIS)

    Bono, Nancy; Fredriksson, Anders; Maersk Hansen, Lars

    2010-12-01

    On behalf of SKB, Golder Associates Ltd carried out a risk analysis of subsidence during Forsmark nuclear power plant in the construction of the final repository for spent nuclear fuel near and below existing reactors. Specifically, the effect of horizontal cracks have been studied

  3. Fukushima Daiichi Unit 1 power plant containment analysis using GOTHIC

    International Nuclear Information System (INIS)

    Ozdemir, Ozkan Emre; George, Thomas L.; Marshall, Mervin D.

    2015-01-01

    Highlights: • The inclusion of vent heat transfer had a significant impact on the overall containment response. • The vent heat transfer and condensation results in lower containment pressure. • The reduced gas transfer to the wetwell via the vents results in higher hydrogen concentration in the drywell. - Abstract: This paper is a part of Fukushima Technical Evaluation Project (EPRI, 2013a, 2014a, 2015) which investigates various aspects of the Fukushima Daiichi event using the GOTHIC code. The analysis takes advantage of the capability of GOTHIC to model certain aspects of the system geometry and behavior in more detail than typically considered in containment performance analysis. GOTHIC is a general purpose thermal hydraulics code that is used extensively in the nuclear industry for system design support, licensing support and safety analysis. It has the capability to model 3-dimensional flow behavior including the effects of turbulence, diffusion and buoyancy (EPRI, 2014b). This allows GOTHIC to be used in cases where mixing effects and stratification are important. The analysis presented here considers the events at Fukushima Daiichi Unit 1 (1F1) following the tsunami and leading up to the time of the hydrogen detonation in the 1F1 Reactor Building. The 1F1 MAAP5 Baseline Scenario (EPRI, 2013b) is used to define the steam, hydrogen and carbon-monoxide source terms from the primary system and the core concrete interaction. The model incorporates three dimensional modeling of the drywell, wetwell and connecting vent system that can predict the 3-dimensional flow patterns and the temperature and gas distributions. The model also includes leakage to the surrounding reactor building and the wetwell vent to the stack. The 3D containment model includes models for the heat transfer from the steam and gas in the drywell vent system to the torus room, wetwell gas space and pool. Inclusion of vent heat transfer had a significant impact on the overall containment

  4. Ring thermal shield piping modification at Pickering Nuclear Generating Station 'A' Unit 1

    International Nuclear Information System (INIS)

    Brown, R.; Cobanoglu, M.M.

    1995-01-01

    Each of the four Pickering Nuclear Generating Station A (PNGSA) CANDU units was constructed with its reactor and dump tank surrounded by a concrete Calandria Vault (CV). The Ring Thermal Shield (RTS) system at PNGSA units is a water cooled structure with internal cooling channels with the purpose of attenuating excessive heat flux from the calandria shell to the end shield rings and adjoining concrete (Figure 1). In newer CANDU units the reactor calandria vessel is surrounded by a large water filled shield tank which eliminates the requirement for the RTS system. The RTS structures are situated in the space between the calandria and the vault walls. Each RTS is assembled from eight flat sided carbon steel segments, tilted towards the calandria and supported from the end shield rings. Cooling water to the RTS is supplied by carbon steel cooling pipes with a portion of the pipe run embedded in the vault walls. Flow through each RTS is divided into two independent circuits, having an inlet and an outlet cooling line. There are four locations of RTS inlet and outlet cooling lines. The inlet lines are located at the bottom and the outlet lines at the top of the RTS. The 'L' shaped section of RTS inlet and outlet cooling lines, from the RTS waterbox to the start of embedded portion at the concrete wall, had become defective due to corrosion induced by excessive Moisture levels in the calandria vaults. An on-line leak sealing capability was developed and placed in service in all four PNGSA units. However, a leak found during the 1994 Unit 1 outage was too large,to seal with the current capability, forcing Ontario Hydro (OH) to develop a method to replace the corroded pipes. The repair project was subject to some lofty performance targets. All tools had to be able to withstand dose rates of up to 3000 Rem/hour. These tools, along with procedures and personnel had to successfully repair the RTS system within 6 months otherwise a costly outage extension would result. This

  5. Feasibility study of passive gamma spectrometry of molten core material from Fukushima Daiichi Nuclear Power Station unit 1, 2, and 3 cores for special nuclear material accountancy - low-volatile FP and special nuclear material inventory analysis and fundamental characteristics of gamma-rays from fuel debris

    International Nuclear Information System (INIS)

    Sagara, Hiroshi; Tomikawa, Hirofumi; Watahiki, Masaru; Kuno, Yusuke

    2014-01-01

    The technologies applied to the analysis of the Three Mile Island accident were examined in a feasibility study of gamma spectrometry of molten core material from the Fukushima Daiichi Nuclear Power Station unit 1, 2, and 3 cores for special nuclear material accountancy. The focus is on low-volatile fission products and heavy metal inventory analysis, and the fundamental characteristics of gamma-rays from fuel debris with respect to passive measurements. The inventory ratios of the low-volatile lanthanides, "1"5"4Eu and "1"4"4Ce, to special nuclear materials were evaluated by the entire core inventories in units 1, 2, and 3 with an estimated uncertainty of 9%-13% at the 1σ level for homogenized molten fuel material. The uncertainty is expected to be larger locally owing to the use of the irradiation cycle averaging approach. The ratios were also evaluated as a function of burnup for specific fuel debris with an estimated uncertainty of 13%-25% at the 1σ level for units 1 and 2, and most of the fuels in unit 3, although the uncertainty regarding the separated mixed oxide fuel in unit 3 would be significantly higher owing to the burnup dependence approach. Source photon spectra were also examined and cooling-time-dependent data sets were prepared. The fundamental characteristics of high-energy gamma-rays from fuel debris were investigated by a bare-sphere model transport calculation. Mass attenuation coefficients of fuel debris were evaluated to be insensitive to its possible composition in a high-energy region. The leakage photon ratio was evaluated using a variety of parameters, and a significant impact was confirmed for a certain size of fuel debris. Its correlation was summarized with respect to the leakage photopeak ratio of source "1"5"4Eu. Finally, a preliminary study using a hypothetical canister model of fuel debris based on the experience at Three Mile Island was presented, and future plans were introduced. (author)

  6. Services for nuclear power stations

    International Nuclear Information System (INIS)

    Fremann, M.; Ryckelynck

    1987-01-01

    This article gives an information as complete as possible about the activities of the french nuclear industry on the export-market. It describes the equipment and services available in the field of services for nuclear power stations [fr

  7. Draft environmental impact statement. New England Power Units 1 and 2 (NEP 1 and 2)

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    Construction of New England Power Company Units 1 and 2 on 120 acres of 604-acre site near Block Island South in Charlestown, Rhode Island is proposed. Each unit would employ a pressurized water reactor to drive a steam turbine generator with a power rating of 1194 megawatts (MWe) of electric power capacity and a net output of 1150 MWe. A once-through flow of water obtained from and discharged into Block Island South at a rate of 1907 cubic feet per second would cool the units' exhaust steam. The station would transmit power through a 6700-foot, 345-kilovolt (kV) transmission line extending underground to the planned Charlestown substation, thence through a total of 70.5 miles of aboveground 345-kV line to the applicant's transmission system. The station would provide area consumers with a 2300-MWe base-load capacity and supply 14 billion kilowatt-hours annually during a 30-year operating life. Construction of the units would generate a total of $640 million in wages, plant operation would employ 250 persons with total wages of $8.4 million annually, and the applicant would contribute 90% of the Charlestown local tax base. Construction activities would cover 350 acres of land, and transmission line rights-of-way would require 1754 acres, including 1300 acres of forestland. Plant structures would mar the landscape, and the cooling system would contribute thermal pollution and some chemical pollutants to the Block Island Sound. Intermittent use of explosives would occur during an eight-to-ten-month period. Entrainment of fish in the cooling system could significantly reduce populations of tautog and cunner in the Block Island Sound

  8. Evaluation of power commissioning of the Mochovce Unit 1 power level up to 100 % Nnom

    International Nuclear Information System (INIS)

    Sarvaic, I.; Mickolci, M.

    1998-01-01

    The document contains an evaluation of the power phase of power commissioning of the Mochovce Unit 1 in the phase up to the power level of 100 % N nom .In the document, the courses and results of tests in this phase of power commissioning are summarized, evaluation of the performance of important systems and equipment of the unit is carried out, and the compliance with Limits and Conditions in the course of the phase is assessed. On this basis, conclusions are drawn and recommendations for the unit to be ready for subsequent phases of the power commissioning. The evaluation was developed by the scientific management of the Mochovce commissioning providing an independent support for the operators for supervising the commissioning tasks from the point of nuclear safety

  9. The Miksova water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Miksova water power station. The Miksova water power station is part of the second derived cascade of hydro power stations on the river Vah. It was built at the end of a huge development in Slovak hydro-energy in the late 1950's and the beginning of the 1960's. It is the second water power station on this derived cascade, which is situated downstream the Hricov reservoir and water power station. At the power station, three turbine sets with vertical Kaplan turbines are installed with a total power output of 3 x 31.2 = 93.6 MW. With this power output the Miksova water power station (Miksova I) was the biggest water power station in the Slovak Republic until the construction of Pumping water power station Liptovska Mara. And it is still the biggest channel water power station on the Vah so far. It was put into operation during the period 1963 to 1965. There are three turbine sets with Kaplan turbines from CKD Blansko, with a synchronous hydro-alternator installed in the power station. Their installed capacity is 93.6 MW in total and the projected annual production of electrical energy is 207 GWh. The turbines are fi ve-bladed (on the Hricov and Povazska Bystrica water power stations they are four-bladed) and the impeller wheel has a diameter of 4800 mm. They are designed for extension of the head from 24.1 to 22.21 m and each of them has an absorption capacity of 134 m 3 .s -1 nd a nominal operating speed of 2.08 m 3 .s -1 , runaway speed 4.9 m 3 .s -1 . Each synchronous hydro-alternator has a maximum power output of 31.2 MW, a nominal voltage of 10.5 kV and power factor cos φ of 0.8. Power from the power station is led out through 110 kV switchgear. The water power station operates under automatic turbine mode of operation with remote indication and control from the Dispatch Centre at Vodne elektrarne, in Trencin. From start of operation until the end of 2003 all three turbine sets operated for a total of 450,500 running hours and the

  10. Loss of Power and Water Hammer Event at San Onofre, Unit 1, on November 21, 1985

    International Nuclear Information System (INIS)

    1986-01-01

    On November 21, 1985, Southern California Edison's Onofre Nuclear Generating Station, Unit 1, located south of San Clemente, California, experienced a partial loss of inplant ac electrical power while the plant was operating at 60% power. Following a manual reactor trip, the plant lost all inplant ac power for 4 minutes and experienced a severe incidence of water hammer in the feedwater system which caused a leak, damaged plant equipment, and challenged the integrity of the plant's heat sink. The most significant aspect of the event involved the failure of five safety-related check valves in the feed-water system whose failure occurred in less than year, without detection, and jeopardized the integrity of safety systems. The event involved a number of equipment malfunctions, operator errors, and procedural deficiencies. This report documents the findings and conclusions of an NRC Incident Investigation Team sent to San Onofre by the NRC Executive Director for Operations in conformance with NRC's recently established Incident Investigation Program

  11. Safety evaluation report related to the operation of Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414)

    International Nuclear Information System (INIS)

    1984-12-01

    This report supplements the Safety Evaluation Report (NUREG-0954) issued in February 1983 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, and Saluda River Electric Cooperative, Inc., as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. This supplement provides additional information supporting the license for initial criticality and power ascension to full-power opertion for Unit 1

  12. Balakovo nuclear power station

    International Nuclear Information System (INIS)

    1996-01-01

    A key means of improving the safety and reliability of nuclear power plants is through effective training of plant personnel. The goal of this paper is to show the progress of the training at the Balakovo Nuclear Power Plant, and the important role that international cooperation programs have played in that progress

  13. 75 FR 13606 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-03-22

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. STN 50-528, STN 50-529, and STN 50-530; NRC-2010-0114] Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Environmental...-74, issued to Arizona Public Service Company (APS, the licensee), for operation of the Palo Verde...

  14. 76 FR 79228 - Combined Licenses at William States Lee III Nuclear Station Site, Units 1 and 2; Duke Energy...

    Science.gov (United States)

    2011-12-21

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 52-018 and 52-019; NRC-2008-0170] Combined Licenses at William States Lee III Nuclear Station Site, Units 1 and 2; Duke Energy Carolinas, LLC AGENCY: Nuclear.... SUMMARY: Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC) and the U.S. Army Corps...

  15. 78 FR 77508 - Duke Energy Carolinas, LLC; William States Lee III Nuclear Station, Units 1 and 2; Combined...

    Science.gov (United States)

    2013-12-23

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 52-018 and 52-019; NRC-2008-0170] Duke Energy Carolinas, LLC; William States Lee III Nuclear Station, Units 1 and 2; Combined Licenses Application Review AGENCY: Nuclear Regulatory Commission. ACTION: Final environmental impact statement; availability...

  16. 78 FR 40200 - Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3; Independent Spent Fuel...

    Science.gov (United States)

    2013-07-03

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 72-1004, 72-40, 50-269, 50-270, and 50-287; NRC-2013-0135] Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3; Independent Spent Fuel Storage Installation; Environmental Assessment and Finding of No Significant Impact AGENCY: Nuclear...

  17. 78 FR 45575 - Duke Energy Carolinas, LLC; Oconee Nuclear Station Units 1, 2, and 3; Independent Spent Fuel...

    Science.gov (United States)

    2013-07-29

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos.: 72-1004, 72-40, 50-269, 50-270, 50-287; and NRC-2013- 0135] Duke Energy Carolinas, LLC; Oconee Nuclear Station Units 1, 2, and 3; Independent Spent Fuel Storage Installation AGENCY: Nuclear Regulatory Commission. ACTION: Exemption; issuance. SUMMARY: The NRC...

  18. Technical Specifications, Seabrook Station, Unit 1 (Docket No. 50-443): Appendix ''A'' to License No. NPF-67

    International Nuclear Information System (INIS)

    1989-05-01

    The Seabrook Station, Unit 1 Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  19. 77 FR 35079 - License Renewal Application for Seabrook Station, Unit 1 ; NextEra Energy Seabrook, LLC

    Science.gov (United States)

    2012-06-12

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-443; NRC-2010-0206] License Renewal Application for Seabrook Station, Unit 1 ; NextEra Energy Seabrook, LLC AGENCY: Nuclear Regulatory Commission. ACTION: License renewal application; intent to prepare supplement to draft [[Page 35080

  20. Safety evaluation report related to the operation of Byron Station, Units 1 and 2 (Docket Nos. STN 50-454 and STN 50-455)

    International Nuclear Information System (INIS)

    1987-03-01

    Supplement No. 8 to the Safety Evaluation Report related to Commonwealth Edison Company's application for licenses to operate the Byron Station, Units 1 and 2, located in Rockvale Township, Ogle County, Illinois, has been prepared by th Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement provides recent information regarding resolution of the license conditions identified in the SER. Because of the favorable resolution of the items discussed in this report, the staff concludes that the Byron Station, Unit 2 can be operated by the licensee at power levels greater than 5% without endangering the health and safety of the public

  1. Start-up and commercial operation of the Laguna Verde power plants, unit 1

    International Nuclear Information System (INIS)

    Torres R, J.F.

    1991-01-01

    The main features of the unit 1 of the Laguna Verde Power Plant is presented as well as the phases of the start-up process. The process includes various steps and tests up to start the commercial operation. (author)

  2. 75 FR 76495 - Virginia Electric and Power Company North Anna Power Station, Unit Nos. 1 and 2 Surry Power...

    Science.gov (United States)

    2010-12-08

    ..., Supplement 1 and 2, ``Use of Nuclear Energy Institute (NEI) 99-01, Methodology for Development of Emergency.... Environmental Impacts of the Proposed Action The NRC has completed its environmental assessment of the proposed... NRC concludes that there are no significant environmental impacts associated with the proposed action...

  3. Advances in power station construction

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    This book is about power stations - specifically about the construction of modern power stations by the Central Electricity Generating Board in England and Wales over the past decade. It describes the work of the CEGB's Generation Development and Construction Division, perhaps better known throughout the world as simply 'Barnwood' where it has its Headquarters in Gloucester, UK. Barnwood was formed in the early 1970s to concentrate the CEGB's then dispersed engineering construction resources to cope with the smaller number but greatly increased size and complexity of modern power station projects. Perhaps uniquely over the ten years since its formation Barnwood has managed the construction of all types of station; coal-fired, oil-fired, nuclear, pumped storage and hydro. This book tells the story of these various projects and gives detailed descriptions of the respective stations. However, it is not intended as a comprehensive description of power station technology. Rather it is intended to convey the scale of such projects and the many decisions and compromises which have to be made in the course of managing their construction

  4. The Paks Nuclear Power Station

    International Nuclear Information System (INIS)

    Erdosi, N.; Szabo, L.

    1978-01-01

    As the first stage in the construction of the Paks Nuclear Power Station, two units of 440 MW(e) each will be built. They are operated with two coolant loops each. The reactor units are VVER 440 type water-moderated PWR type heterogeneous power reactors designed in the Soviet Union and manufactured in Czechoslovakia. Each unit operates two Soviet-made K-220-44 steam turbines and Hungarian-made generators of an effective output of 220 MW. The output of the transformer units - also of Hungarian made - is 270 MVA. The radiation protection system of the nuclear power station is described. Protection against system failures is accomplished by specially designed equipment and security measures especially within the primary circuit. Some data on the power station under construction are given. (R.P.)

  5. Power station simulators

    International Nuclear Information System (INIS)

    Zanobetti

    1989-01-01

    The number and the variety of simulators have gown to such an extent that it has become necessary to classify the numerous types now available. Simulators are of paramount importance for the design of nuclear power plants, for optimizing their efficiency and for the training of their operators: factors that contribute to their overall security. This book contains chapters on the following subjects: the development of power plant simulators, the components and classification of simulators, simulator technology, simulator performance and problems in simulator training

  6. Safety Evaluation Report related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. STN 50-456 and STN 50-457)

    International Nuclear Information System (INIS)

    1988-06-01

    In November 1983, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1002) regarding the application filed by the Commonwealth Edison Company, as applicant and owner, for a license to operate Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457). The first supplement to NUREG-1002 was issued in September 1986; the second supplement was issued in October 1986; the third supplement was issued in May 1987; the fourth supplement was issued in July 1987 in support of the full power license for Unit 1; the fifth supplement was issued in December 1987 in support of the low power license for Unit 2. This sixth supplement to NUREG-1002 is in support of the full-power license for Unit 2 and provides the status of items that remained unresolved at the time Supplement 5 was published. The facility is located in Reed Township, Will County, Illinois

  7. Space Station power system issues

    International Nuclear Information System (INIS)

    Giudici, R.J.

    1985-01-01

    Issues governing the selection of power systems for long-term manned Space Stations intended solely for earth orbital missions are covered briefly, drawing on trade study results from both in-house and contracted studies that have been conducted over nearly two decades. An involvement, from the Program Development Office at MSFC, with current Space Station concepts began in late 1982 with the NASA-wide Systems Definition Working Group and continued throughout 1984 in support of various planning activities. The premise for this discussion is that, within the confines of the current Space Station concept, there is good reason to consider photovoltaic power systems to be a venerable technology option for both the initial 75 kW and 300 kW (or much greater) growth stations. The issue of large physical size required by photovoltaic power systems is presented considering mass, atmospheric drag, launch packaging and power transmission voltage as being possible practicality limitations. The validity of searching for a cross-over point necessitating the introduction of solar thermal or nuclear power system options as enabling technologies is considered with reference to programs ranging from the 4.8 kW Skylab to the 9.5 gW Space Power Satellite

  8. Internal event analysis for Laguna Verde Unit 1 Nuclear Power Plant. Accident sequence quantification and results

    International Nuclear Information System (INIS)

    Huerta B, A.; Aguilar T, O.; Nunez C, A.; Lopez M, R.

    1994-01-01

    The Level 1 results of Laguna Verde Nuclear Power Plant PRA are presented in the I nternal Event Analysis for Laguna Verde Unit 1 Nuclear Power Plant, CNSNS-TR 004, in five volumes. The reports are organized as follows: CNSNS-TR 004 Volume 1: Introduction and Methodology. CNSNS-TR4 Volume 2: Initiating Event and Accident Sequences. CNSNS-TR 004 Volume 3: System Analysis. CNSNS-TR 004 Volume 4: Accident Sequence Quantification and Results. CNSNS-TR 005 Volume 5: Appendices A, B and C. This volume presents the development of the dependent failure analysis, the treatment of the support system dependencies, the identification of the shared-components dependencies, and the treatment of the common cause failure. It is also presented the identification of the main human actions considered along with the possible recovery actions included. The development of the data base and the assumptions and limitations in the data base are also described in this volume. The accident sequences quantification process and the resolution of the core vulnerable sequences are presented. In this volume, the source and treatment of uncertainties associated with failure rates, component unavailabilities, initiating event frequencies, and human error probabilities are also presented. Finally, the main results and conclusions for the Internal Event Analysis for Laguna Verde Nuclear Power Plant are presented. The total core damage frequency calculated is 9.03x 10-5 per year for internal events. The most dominant accident sequences found are the transients involving the loss of offsite power, the station blackout accidents, and the anticipated transients without SCRAM (ATWS). (Author)

  9. Safety evaluation report related to the operation of Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414)

    International Nuclear Information System (INIS)

    1984-07-01

    The report supplements the Safety Evaluation Report (NUREG-0954) issued in February 1983 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, and Saluda River Electric Cooperative, Inc. as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. This supplement provides additional information supporting the license for fuel loading and precriticality testing for Unit 1

  10. Monitoring of nuclear power stations

    International Nuclear Information System (INIS)

    Ull, E.; Labudda, H.J.

    1987-01-01

    The purpose of the invention is to create a process for undelayed automated detection and monitoring of accidents in the operation of nuclear power stations. According to the invention, this problem is solved by the relevant local measurements, such as radiation dose, components and type of radiation and additional relevant meteorological parameters being collected by means of wellknown data collection platforms, these being transmitted via transmission channels by means of satellites to suitable worldwide situated receiving stations on the ground, being processed there and being evaluated to recognise accidents. The local data collection platforms are used in the immediate vicinity of the nuclear power station. The use of aircraft, ships and balloons as data collection systems is also intended. (HWJ)

  11. Safety Evaluation Report related to the operation of Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414). Supplement No. 6

    International Nuclear Information System (INIS)

    1986-05-01

    This report supplements the Safety Evaluation Report (NUREG-0954) issued in February 1983 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, Saluda River Electric Cooperative, Inc., and Piedmont Municipal Power Agency, as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 miles) north of Rock Hill and adjacent to Lake Wylie. This supplement provides additional information supporting the license for operation above 5% power and power ascension to full-power operation for Unit 2

  12. Merchant funding for power stations

    International Nuclear Information System (INIS)

    Johnston, B.; Bartlam, M.

    1997-01-01

    The next frontier for project finance is merchant generation: the financing of IPPs without long-term offtake contracts. Banks are just beginning to finance merchant generation power stations. One of the first was Destec's Indian Queens project in Cornwall, UK. Bruce Johnston and Martin Bartlam of Wilde Sapte discuss the project. (UK)

  13. Pumps for nuclear power stations

    International Nuclear Information System (INIS)

    Ogura, Shiro

    1979-01-01

    16 nuclear power plants are in commercial operation in Japan, and nuclear power generation holds the most important position among various substitute energies. Hereafter also, it is expected that the construction of nuclear power stations will continue because other advantageous energy sources are not found. In this paper, the outline of the pumps used for BWR plants is described. Nuclear power stations tend to be large scale to reduce the construction cost per unit power output, therefore the pumps used are those of large capacity. The conditions to be taken in consideration are high temperature, high pressure, radioactive fluids, high reliability, hydrodynamic performances, aseismatic design, relevant laws and regulations, and quality assurance. Pumps are used for reactor recirculation system, control rod driving hydraulic system, boric acid solution injecting system, reactor coolant purifying system, fuel pool cooling and purifying system, residual heat removing system, low pressure and high pressure core spraying systems, and reactor isolation cooling system, for condensate, feed water, drain and circulating water systems of turbines, for fresh water, sea water, make-up water and fire fighting services, and for radioactive waste treating system. The problems of the pumps used for nuclear power stations are described, for example, the requirement of high reliability, the measures to radioactivity and the aseismatic design. (Kako, I.)

  14. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement No. 4

    International Nuclear Information System (INIS)

    1985-05-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the applicant) for licenses to operate the Limerick Generating Station, Units 1 and 2 located on a site in Montgomery and Chester Counties, Pennsylvania. A license (NPF-27) for the operation of Limerick Unit 1 was issued on October 26, 1984. The license, which was restricted to a five percent power level, contained conditions which required resolution prior to proceeding beyond the five percent power level. This Supplement 4 to the SER addresses some of those technical issues and their associated license conditions which require resolution prior to proceeding beyond the five percent power level. The remaining issues to be addressed prior to proceeding beyond the five percent power level will be addressed in a later supplement to this report. This Supplement 4 to the SER also contains the comments made by the Advisory Committee on Reactor Safeguards in its report dated November 6, 1984, regarding full power operation of Limerick Unit 1

  15. AECL's participation in the commissioning of Point Lepreau generating station unit 1

    International Nuclear Information System (INIS)

    Chawla, S.; Singh, K.; Yerramilli, S.

    1983-05-01

    Support from Atomic Energy of Canada Ltd. (AECL) to Point Lepreau during the commissioning program has been in the form of: seconded staff for commissioning program management, preparation of commissioning procedures, and hands-on commissioning of several systems; analysis of test results; engineering service for problem solving and modifications; design engineering for changes and additions; procurement of urgently-needed parts and materials; technological advice; review of operational limits; interpretation of design manuals and assistance with and preparation of submissions to regulatory authorities; and development of equipment and procedures for inspection and repairs. This, together with AECL's experience in the commissioning of other 600 MWe stations, Douglas Point and Ontario Hydro stations, provides AECL with a wide range of expertise for providing operating station support services for CANDU stations

  16. Safety Evaluation Report related to the operation of Cartawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414). Supplement No. 5

    International Nuclear Information System (INIS)

    1986-02-01

    This report supplements the Safety Evaluation Report (NUREG-0954) issued in February 1983 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, Saluda River Electric Cooperative, Inc., and Piedmont Municipal Power Agency, as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. This supplement provides additional information supporting the license for initial criticality and power ascension to full-power operation for Unit 2

  17. Salem Nuclear Generating Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Initial reactor criticality was achieved 12/11/76 and power generation began 12/25/76. Information is presented concerning operation, maintenance, procedure and specification changes, power generation, unit shutdowns and forced power reductions, testing, and personnel radiation exposures

  18. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement No. 5

    International Nuclear Information System (INIS)

    1985-07-01

    In August 1983 the NRC issues its Safety Evaluation Report regarding the application for licenses to operate the Limerick Generating Station, Units 1 and 2 located on a site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 was issued in December 1983 and addressed several outstanding issues. SSER 1 also contains the comments made by the Advisory Committee on Reactor Safeguards in its interim report dated October 18, 1983. Supplement 2 was issued in October 1984. Supplement 3 was issued in October 1984 and addressed the remaining issues that required resolution before issuance of the operating licence for Unit 1. On October 26, 1984 a license (NPF-27) for Unit 1 was issued which was restricted to a five percent power level and contained conditions which required resolution prior to proceeding beyond the five percent power level. Supplement 4 issued in May 1985 addressed some of the technical issues and their associated license conditions, which required resolution prior to proceeding beyond the five percent power level. SSER 4 also contained the comments made by the Advisory Committee on Reactor Safeguards in its report dated November 6, 1984. This Supplement 5 to the SER addresses further issues that require resolution prior to proceeding beyond the five percent power level

  19. Reviewing nuclear power station achievement

    International Nuclear Information System (INIS)

    Howles, L.R.

    1976-01-01

    For measurement of nuclear power station achievement against original purchase the usual gross output figures are of little value since the term loosely covers many different definitions. An authentically designed output figure has been established which relates to net design output plus house load at full load. Based on these figures both cumulative and moving annual load factors are measured, the latter measuring the achievement over the last year, thus showing trends with time. Calculations have been carried out for all nuclear stations in the Western World with 150 MW(e) gross design output and above. From these are shown: moving annual load factor indicating relative station achievements for all the plants; cumulative load factors from which return of investment can be calculated; average moving annual load factors for the four types of system Magnox, PWR, HWR, and BWR; and a relative comparison of achievement by country in a few cases. (U.K.)

  20. Summary revaluation of energetic start-up of the unit 1 of nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Sarvaic, I.; Miskolci, M.

    1998-01-01

    The document contents stage revaluation of energetic start-up of the unit 1 of nuclear power plant Mochovce. Test results of the stage of energetic start-up are summarized in the document, valuation of important systems and block devices as well as fulfilling the operation limits and conditions has been performed. On that base conclusions and recommendations for start-up the unit 2 and for commercial operation of the unit 1 are elaborated. The valuation has been elaborated by a scientific management for start-up nuclear power plant Mochovce of nuclear safety of nuclear power facilities. Scientific management for start-up of nuclear power plant Mochovce performed continuous valuation of individual power levels after ending of each individual level and it gave its valuation to energy power level with recommendations and conditions for further start-up process and operation. Scientific management finished its activity at the unit 1 of nuclear power plant Mochovce according to a statute of scientific management for start-up after successful completion of conclusive block run. Scientific management group was founded in February 1998 at nuclear power plant Mochovce. Its members are experts from Slovak, Czech, Russian and French organizations which are participating in power plant completion. Members are listed in a supplement No. 2

  1. Indian Point Station, Units 1, 2, and 3. Annual operations report No. 27: January--December 1977

    International Nuclear Information System (INIS)

    1978-01-01

    Unit 1 remained shutdown with the fuel removed to the Fuel Handling Building pending a decision by the Company on the installation of an ECCS. Information for Unit 2 and 3 is presented concerning procedure changes, tests, experiments, maintenance, equipment examinations, radioactivity releases, shutdowns and forced power reductions, and the number of personnel and Man/Rem exposure by work and job function

  2. Considerations for increasing unit 1 spent fuel pool capacity at the Laguna Verde station

    International Nuclear Information System (INIS)

    Vera, A.

    1992-01-01

    To increase the spent fuel storage capacity at the Laguna Verde Station in a safe and economical manner and assure a continuous operation of the first Mexican Nuclear Plant, Comision Federal de Electricidad (CFE), the Nation's Utility, seeked alternatives considering the overall world situation, the safety and licensing aspects, as well as the economics and the extent of the nuclear program of Mexico. This paper describes the alternatives considered, their evaluation and how the decision taken by CFE in this field, provides the Laguna Verde Station with a maximum of 37 years storage capacity plus full core reserve

  3. Decommissioning of nuclear power stations

    International Nuclear Information System (INIS)

    Gregory, A.R.

    1988-01-01

    In the United Kingdom the Electricity Boards, the United Kingdom Atomic Energy Authority (UKAEA) and BNFL cooperate on all matters relating to the decommissioning of nuclear plant. The Central Electricity Generating Board's (CEGB) policy endorses the continuing need for nuclear power, the principle of reusing existing sites where possible and the building up of sufficient funds during the operating life of a nuclear power station to meet the cost of its complete clearance in the future. The safety of the plant is the responsibility of the licensee even in the decommissioning phase. The CEGB has carried out decommissioning studies on Magnox stations in general and Bradwell and Berkeley in particular. It has also been involved in the UKAEA Windscale AGR decommissioning programme. The options as to which stage to decommission to are considered. Methods, costs and waste management are also considered. (U.K.)

  4. 20 years of power station master training

    International Nuclear Information System (INIS)

    Schwarz, O.

    1977-01-01

    In the early fifties, the VGB working group 'Power station master training' elaborated plans for systematic and uniform training of power station operating personnel. In 1957, the first power station master course was held. In the meantime, 1.720 power station masters are in possession of a master's certificate of a chamber of commerce and trade. Furthermore, 53 power station masters have recently obtained in courses of the 'Kraftwerksschule e.V.' the know-how which enables them to also carry out their duty as a master in nuclear power stations. (orig.) [de

  5. Safety evaluation report related to the operation of Susquehanna Steam Electric Station, Units 1 and 2 (Docket Nos. 50-387 and 50-388). Suppl.6

    International Nuclear Information System (INIS)

    1984-03-01

    In April 1981, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0776) regarding the application of the Pennsylvania Power and Light Company (the applicant and/or licensee) and the Allegheny Electric Cooperative, Inc. (co-applicant) for licenses to operate the Susquehanna Steam Electric Station, Units 1 and 2, located on a site in Luzerne County, Pennsylvania. This supplement to NUREG-0776 addresses the remaining issues that required resolution before licensing operation of Unit 2 and closes them out

  6. 75 FR 9618 - Virginia Electric and Power Company Surry Power Station, Unit Nos. 1 and 2 Environmental...

    Science.gov (United States)

    2010-03-03

    ... change to radioactive effluents that effect radiation exposures to plant workers and members of the.... There would be no impact to socioeconomic resources. Therefore, no changes to or different types of non...

  7. Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 successfully completed its first core cycle with unit availability of 95.2 percent. Saltwater leakage into the condenser continues to be a problem. Unit 2 achieved initial criticality November 30 and was initially paralleled to the Baltimore system on December 7. Information is presented concerning operations, specifications, maintenance, shutdowns and power reduction, and personnel exposures

  8. 75 FR 20867 - DTE Energy; Enrico Fermi Atomic Power Plant, Unit 1

    Science.gov (United States)

    2010-04-21

    ... Power Plant, Unit 1 Environmental Assessment and Finding of No Significant Impact for an Exemption From... County, Michigan. Environmental Assessment Identification of Proposed Action The proposed action is in... the Michigan Department of Natural Resources and the Environment, Radiological Protection and Medical...

  9. Audit Calculations of LBLOCA for Ulchin Unit 1 and 2 Power Up rate

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Donggu; Huh, Byunggil; Yoo, Seunghunl; Yang, Chaeyong; Seul, Kwangwon [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2013-05-15

    The KINS-Realistic Evaluation Model (KINS-REM) was developed for the independent audit calculation in 1991, and the code accuracy and statistical method have been improved. To support the licensing review and to confirm the validity of licensee's calculation, regulatory auditing calculations have been also conducted. Currently, the modification of Ulchin 1 and 2 operating license for 4.5% power up rate is under review. In this study, the regulatory audit calculation for LBLOCA of Ulchin Unit 1 and 2 with 4.5% power up rate was performed by applying KINS-REM. In this study, the regulatory audit calculation for LBLOCA of Ulchin Unit 1 and 2 with 4.5% power up rate was performed by applying KINS-REM. It is confirmed that the analysis results of LBLOCA for Ulchin 1 and 2 power up rate meets the PCT acceptance criteria.

  10. Nine Mile Point Nuclear Station, Unit 1. Annual report of operation, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 3,044,948 MWh(e) with the reactor on line 6,238 hrs. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, reportable occurrences, effluent and waste disposal, meteorological summary, and environmental monitoring

  11. Fort Calhoun Station, Unit 1. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Net electrical power generated was 604,751.4 MHWH(e) with the reactor on line 2,049.9 hrs. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental monitoring. (FS)

  12. Nine Mile Point Nuclear Station, Unit 1. Annual report of operation: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical power generated was 4,112,827 MWH with the reactor on line 7,727.67 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, reportable occurrences, and fuel performance

  13. Fort Calhoun Station, Unit 1. Semiannual report, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 1,562,051.4 MWH(e) with the reactor on line 3,858.6 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, primary coolant, chemistry, occupational radiation exposure, release of radioactive materials, and environmental monitoring

  14. Three Mile Island Nuclear Station, Unit 1. 1976 annual operating report

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical power generated was 4,335,625 MWh with the reactor on line 5,747.5 hrs. Information is presented concerning operations; specification, procedures, and FSAR changes; corrective maintenance; irradiated fuel examinations; radioactive effluent releases; personnel radiation exposures; shutdowns; and forced power reductions

  15. Vogtle Unit 1 readiness review: Assessment of Georgia Power Company readiness review pilot program

    International Nuclear Information System (INIS)

    Lewis, G.

    1987-09-01

    Georgia Power Company (GPC) performed a readiness review at Vogtle Unit 1 as a pilot program. The pilot program was a new and innovative approach for the systematic and disciplined review, with senior management involvement, of GPC's implementation of design, construction, and operational readiness processes. The program's principal objective was to increase the level of assurance that quality programs at Vogtle Unit 1 have been accomplished in accordance with regulatory requirements. This report assesses the effectiveness of the GPC's readiness review pilot program (RRPP) at Vogtle Unit 1. It includes (1) an overview of what was experienced during the program's implementation, (2) an assessment of how well program objectives were met, and (3) lessons learned on the future use of the readiness review concept. Overall, GPC and the NRC staff believe that the RRPP at Vogtle Unit 1 was a success and that the program provided significant added assurance that Vogtle Unit 1 licensing commitments and NRC regulations have been adequately implemented. Although altering the NRC licensing review process for the few plants still in the construction pipeline may not be appropriate, licensees may benefit significantly by performing readiness reviews on their own initiative as GPC did for Vogtle. (7 refs.)

  16. Fire protection concept for power stations

    International Nuclear Information System (INIS)

    Zitzmann, H.

    The author shows how a systematic approach permits the design of a fire-protected power station. The special conditions of an individual power station are here treated as marginal conditions. The article describes how the concept is realized in the completed power station, taking account of the information provided by fire statistics. (orig.) [de

  17. Three Mile Island Nuclear Station, Unit 1. Semiannual operating report No. 4, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Information is presented concerning operations, shutdowns, maintenance, changes, tests, experiments, radioactive effluent releases, solid radioactive waste, primary coolant chemistry, personel radiation, and refueling. Histograms of thermal power vs. time are included

  18. Plant diagnostics in power stations

    International Nuclear Information System (INIS)

    Sturm, A.; Doering, D.

    1985-01-01

    The method of noise diagnostics is dealt with as a part of plant diagnostics in nuclear power stations. The following special applications are presented: (1) The modular noise diagnostics system is used for monitoring primary coolant circuits and detecting abnormal processes due to mechanical vibrations, loose parts or leaks. (2) The diagnostics of machines and plants with antifriction bearings is based on bearing vibration measurements. (3) The measurement of the friction moment by means of acoustic emission analysis is used for evaluating the operational state of slide bearings

  19. Local society and nuclear power stations

    International Nuclear Information System (INIS)

    1984-02-01

    This report was made by the expert committee on region investigation, Japan Atomic Industrial Forum Inc., in fiscal years 1981 and 1982 in order to grasp the social economic influence exerted on regions by the location of nuclear power stations and the actual state of the change due to it, and to search for the way the promotion of local community should be. The influence and the effect were measured in the regions around the Fukushima No. 1 Nuclear Power Station of Tokyo Electric Power Co., Inc., the Mihama Power Station of Kansai Electric Power Co., Inc., and the Genkai Nuclear Power Station of Kyushu Electric Power Co., Inc. The fundamental recognition in this discussion, the policy of locating nuclear power stations and the management of regions, the viewpoint and way of thinking in the investigation of the regions where nuclear power stations are located, the actual state of social economic impact due to the location of nuclear power stations, the connected mechanism accompanying the location of nuclear power stations, and the location of nuclear power stations and the acceleration of planning for regional promotion are reported. In order to economically generate electric power, the rationalization in the location of nuclear power stations is necessary, and the concrete concept of building up local community must be decided. (Kako, I.)

  20. San Onofre Nuclear Generating Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Gross electrical energy generated was 2,610,000 MWH with the generator on line 6,162.9 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, reportable occurrences, steam generator tube inspections, primary coolant chemistry, containment penetration leak tests, and radiological environmental monitoring

  1. Rancho Seco Nuclear Generating Station, Unit 1. Annual report for 1976

    International Nuclear Information System (INIS)

    1977-03-01

    Net electrical energy generated was 2,205,091 MWH with the generator on line 2,662 hrs. Information is presented concerning operations, changes, tests, maintenance, fuel performance, refueling, shutdowns and outages, containment local leak rate testing, and power generation

  2. Lessons learned from the seismic reevaluation of San Onofre Nuclear Generating Station, Unit 1

    International Nuclear Information System (INIS)

    Russell, M.J.; Shieh, L.C.; Tsai, N.C.; Cheng, T.M.

    1987-01-01

    A seismic reevaluation program was conducted for the San Onofre Nuclear Generating Station, Unit No. 1 (SONGS 1). SEP was created by the NRC to provide (1) an assessment of the significance of differences between current technical positions on safety issues and those that existed when a particular plant was licensed, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. The Systematic Evaluation Program (SEP) seismic review for SONGS 1 was exacerbated by the results of an evaluation of an existing capable fault near the site during the design review for Units 2 and 3, which resulted in a design ground acceleration of 0.67g. Southern California Edison Company (SCE), the licensee for SONGS 1, realized that a uniform application of existing seismic criteria and methods would not be feasible for the upgrading of SONGS 1 to such a high seismic requirement. Instead, SCE elected to supplement existing seismic criteria and analysis methods by developing criteria and methods closer to the state of the art in seismic evaluation techniques

  3. Insurance of nuclear power stations

    International Nuclear Information System (INIS)

    Debaets, M.

    1992-01-01

    Electrical utility companies have invested large sums in the establishment of nuclear facilities. For this reason it is normal for these companies to attempt to protect their investments as much as possible. One of the methods of protection is recourse to insurance. For a variety of reasons traditional insurance markets are unable to function normally for a number of reasons including, the insufficient number of risks, an absence of meaningful accident statistics, the enormous sums involved and a lack of familiarity with nuclear risks on the part of insurers, resulting in a reluctance or even refusal to accept such risks. Insurers have, in response to requests for coverage from nuclear power station operators, established an alternative system of coverage - insurance through a system of insurance pools. Insurers in every country unite in a pool, providing a net capacity for every risk which is a capacity covered by their own funds, and consequently without reinsurance. All pools exchange capacity. The inconvenience of this system, for the operators in particular, is that it involves a monopolistic system in which there are consequently few possibilities for the negotiation of premiums and conditions of coverage. The system does not permit the establishment of reserves which could, over time, reduce the need for insurance on the part of nuclear power station operators. Thus the cost of nuclear insurance remains high. Alternatives to the poor system of insurance are explored in this article. (author)

  4. Marble Hill Nuclear Generating Station, Units 1 and 2. License application, PSAR, general information

    International Nuclear Information System (INIS)

    1975-01-01

    An application is presented for two PWR reactors to be constructed in Salud Township, Jefferson County, Indiana, about six miles northeast of New Washington on the Ohio River. Each unit will have a rated core power level of 3411 MW(t) with a corresponding electrical output of 1130 MW(e). Mechanical draft cooling towers will be provided. The facility, which will replicate the Byron facility will be employed for the generation of electricity for transmission, sale for resale, and distribution

  5. Fort Calhoun Station, Unit 1. Annual operation report: January-December 1977 (including environmental report)

    International Nuclear Information System (INIS)

    1978-02-01

    Net electrical energy generated in 1977 was 2,922,683.7 MWH with the generator on line 6,959.8 hours. Information is presented concerning operations, power generation, shutdowns, maintenance, changes, tests, experiments, occupational personnel radiation exposures, and primary coolant chemistry. Data on radioactive effluent releases, meteorology, environmental monitoring, and potential radiation doses to individuals for July 7, 1977 to December 31, 1977 are also included

  6. The software testing of PPS for shin Ulchin nuclear power plant units 1 and 2

    International Nuclear Information System (INIS)

    Kang, Dong Pa; Park, Cheol Lak; Cho, Chang Hui; Sohn, Se Do; Baek, Seung Min

    2012-01-01

    The testing of software (S/W) is the process of analyzing a software item to detect the differences between existing and required conditions to evaluate the features of the software items. This paper introduces the S/W testing of Plant Protection System (PPS), as a safety system which actuate Reactor Trip (RT) and Engineered Safety Features (ESF) for Shin Ulchin Nuclear Power Plant Units 1 and 2 (SUN 1 and 2)

  7. 77 FR 66484 - PSEG Nuclear LLC; Hope Creek Generating Station and Salem Generating Station, Units 1 and 2...

    Science.gov (United States)

    2012-11-05

    ... Power Plant Personnel,'' endorses the Nuclear Energy Institute (NEI) report, NEI 06-11, Revision 1... exclusion, set forth in 10 CFR 51.22(c)(25). Pursuant to 10 CFR 51.22(b), no environmental impact statement... Commission (NRC or the Commission) now or hereafter in effect. The facilities consist of one boiling-water...

  8. Fracture mechanics evaluation of feedwater line failure at Surry-2: Final report

    International Nuclear Information System (INIS)

    Zahoor, A.; Gamble, R.M.

    1987-10-01

    The purpose of this work was to perform a fracture mechanics evaluation of a failure that occurred in an elbow of the 18-inch suction line to the ''A'' main feed pump at Surry Power Station, Unit 2. The failure occurred during a pressure transient subsequent to a reactor trip, which was initiated by a low-low steam generator level protection signal. Analyses were performed to characterize the crack formation and growth sequence at the estimated failure pressure (550 psi) and normal operating pressure (367 psi); this work included predicting the longitudinal throughwall crack lengths for initial wall breakthrough and failure. A sensitivity study also was performed to assess the effect on the results of variations in several conditions that generally influence failure

  9. Fracture mechanics evaluation of feedwater line failure at Surry-2: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Zahoor, A.; Gamble, R.M.

    1987-10-01

    The purpose of this work was to perform a fracture mechanics evaluation of a failure that occurred in an elbow of the 18-inch suction line to the ''A'' main feed pump at Surry Power Station, Unit 2. The failure occurred during a pressure transient subsequent to a reactor trip, which was initiated by a low-low steam generator level protection signal. Analyses were performed to characterize the crack formation and growth sequence at the estimated failure pressure (550 psi) and normal operating pressure (367 psi); this work included predicting the longitudinal throughwall crack lengths for initial wall breakthrough and failure. A sensitivity study also was performed to assess the effect on the results of variations in several conditions that generally influence failure.

  10. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2, Docket nos. 50-352 and 50-353

    International Nuclear Information System (INIS)

    1989-08-01

    In August 1983 the staff of the Nuclear Regulatory commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for the licenses to operate the Limerick Generating Station, Units 1 and 2, located on a site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 was issued in December 1983. Supplement 2 was issued in October 1984. Supplement 3 was issued in October 1984. Supplement 4 was issued in May 1985. Supplement 5 was issued in July 1985. Supplement 6 was issued in August 1985 and Supplement 7 was issued in April 1989. Supplement 7 addresses the major design differences between Units 1 and 2, the resolution of all issues that remained open when the Unit 1 full-power license was issued, the staff's assessment regarding the application by the licensee to operate Unit 2 and issues that require resolution before issuance of an operating license for Unit 2. Supplements 8 and 9 address further issues that require resolution prior to issuance of an operating license. 1 tab

  11. Safety evaluation report related to the operation of Catawba Nuclear Station, Units 1 and 2. Docket Nos. 50-413 and 50-414. Suppl. 1

    International Nuclear Information System (INIS)

    1983-04-01

    This reort supplements the Safety Evaluation Report (NUREG-0954) issued in February 1983 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, and Saluda River Electric Cooperative, Inc. as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. This supplement provides more recent information regarding resolution or updating of some of the open and confirmatory items and license conditions identified in the Safety Evaluation Report, and discusses the recommendations of the Advisory Committee on Reactor Safeguards in its report dated March 15, 1983

  12. Safety Evaluation Report related to the operation of Grand Gulf Nuclear Station, Units 1 and 2 (Docket Nos. 50-416 and 50-417)

    International Nuclear Information System (INIS)

    1984-10-01

    This report supplements the Safety Evaluation Report (NUREG-0831) issued in September 1981 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Mississippi Power and Light (MP and L) Company, Middle South Energy, Inc., and South Mississippi Electric Power Association as applicants and owners, for licenses to operate the Grand Gulf Nuclear Station, Units 1 and 2 (Docket Nos. 50-416 and 50-417, respectively). The facility is located on the east bank of the Mississippi River near Port Gibson in Claiborne County, Mississippi. This supplement provides information on the NRC staff's evaluation of requests for exemptions to NRC regulations pursuant to the Commission's direction in CLI-84-19, dated October 25, 1984

  13. Safety evaluation report related to the operation of Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414). Supplement 2

    International Nuclear Information System (INIS)

    1984-06-01

    This report supplements the Safety Evaluation Report (NUREG-0954) and Supplement 1 with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, and Saluda River Electric Cooperative, Inc., as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos., 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. This supplement provides more recent information regarding resolution or updating of some of the open and confirmatory issues and license conditions identified in the Safety Evaluation Report

  14. Occupational exposure analysis at the unit 1 of Almirante Alvaro Alberto nuclear power plant

    International Nuclear Information System (INIS)

    Moraes, A.

    1985-01-01

    In order to obtain a complete knowledge of occupational conditions in a PWR nuclear power station, the individual and collective dose distributions are being analysed during the Angra I (Rio de Janeiro - Brazil) station activities. Work conditions with identification of critical areas and groups as well as classification of tasks related to reactor maintenance and startup periods are also studied. This paper analyses radiological data measured at different power levels of the reactor and during maintenance and repair services as well as the refueling operation. (author)

  15. Flame visualization in power stations

    Energy Technology Data Exchange (ETDEWEB)

    Hulshof, H J.M.; Thus, A W; Verhage, A J.L. [KEMA - Fossil Power Plants, Arnhem (Netherlands)

    1993-01-01

    The shapes and temperature of flames in power stations, fired with powder coal and gas, have been measured optically. Spectral information in the visible and near infrared is used. Coal flames are visualized in the blue part of the spectrum, natural gas flames are viewed in the light of CH-emission. Temperatures of flames are derived from the best fit of the Planck-curve to the thermal radiation spectrum of coal and char, or to that of soot in the case of gas flames. A measuring method for the velocity distribution inside a gas flame is presented, employing pulsed alkali salt injection. It has been tested on a 100 kW natural gas flame. 3 refs., 9 figs.

  16. Upgrade of Control and Protection System of the Ignalina Nuclear Power Plant Units 1 and 2

    International Nuclear Information System (INIS)

    Wright, Ronald E.; Fletcher, Norman; Sidnev, Victor E.; Bickel, John H.; Vianello, Aldo; Pearsall, Raymond D.

    2003-01-01

    The Ignalina nuclear power plant (NPP) Units 1 and 2 are Soviet-designed, RBMK (Reaktor Bolshoi Moschnosti Kipyashchiy), channelized, large power-type reactors. The original-design electrical capacity for each unit was 1500 MW. Unit 1 began operating in 1983, and Unit 2 was started up in 1987. In 1994, the government of Lithuania agreed to accept grant support for the Ignalina NPP Safety Improvement Program with funding supplied by the Nuclear Safety Account of the European Bank for Reconstruction and Development (EBRD). As conditions for receiving this funding, the Ignalina NPP agreed to prepare a comprehensive safety analysis report that would undergo independent peer review after it was issued. The EBRD Safety Panel oversaw preparation and review of the report. In 1996, the safety analysis report for Unit 1 was completed and delivered to the EBRD. Part of the analyses covered anticipated transients without scram (ATWS). The analysis showed that some ATWS scenarios could lead to unacceptable consequences in <1 min. The EBRD Safety Panel recommended to the government of Lithuania that the Ignalina NPP develop and implement a program of compensatory measures for the control and protection system before the unit would be allowed to return to operation following its 1998 maintenance outage. A compensatory control and protection system that would mitigate the unacceptable consequences was designed, procured, manufactured, tested, and installed. The project was funded by U.S. Department of Energy

  17. Critical evaluation of the nonradiological environmental technical specifications. Volume 4. San Onofre Nuclear Generating Station, Unit 1

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.M.; Cunningham, P.A.; Gray, D.D.; Kumar, K.D.

    1976-08-10

    A comprehensive study of the data collected as part of the environmental Technical Specifications program for Unit 1 of the San Onofre Nuclear Generating Station (SONGS 1) was conducted for the Office of Nuclear Regulatory Research of the U.S. Nuclear Regulatory Commission. The program included an analysis of the hydrothermal and ecological monitoring data collected during 1975. The hydrothermal analysis includes a discussion of models used in plume predictions prior to plant operation and an evaluation of the present hydrothermal monitoring program. The ecological evaluation was directed toward reviewing the strengths and weaknesses of the various sampling programs designed to monitor the planktonic, benthic, and nektonic communities inhabiting the inshore coastal area in the vicinity of San Onofre.

  18. Metallurgical investigation of cracking of the isolation valve downstream piping of regenerative heat exchanger at beaver valley unit 1 station

    International Nuclear Information System (INIS)

    Rao, G.V.

    1998-01-01

    A metallurgical investigation was conducted to establish the mechanism and cause of cracking in the regenerative heat exchanger piping at Beaver Valley Unit 1 PWR station in the USA. The investigation, which was centered on an eight inch long pipe section containing the cracking included surface examinations, metallographic and fractographic examinations, and chemistry evaluations. The results of the examinations showed that there were two types of pipe degradation mechanisms that affected the type 304 stainless schedule 40 piping. These consisted of localized corrosive attack on the OD surface due to the presence of chlorides, sulphates and phosphates, and transgranular stress corrosion cracking in the pipe wall due to the presence of chloride contaminants. The overall results of the investigation showed that the introduction of contaminants from external sources other than pipe insulation was the cause of heat exchanger pipe cracking. (author)

  19. Critical evaluation of the nonradiological environmental technical specifications. Volume 4. San Onofre Nuclear Generating Station, Unit 1

    International Nuclear Information System (INIS)

    Adams, S.M.; Cunningham, P.A.; Gray, D.D.; Kumar, K.D.

    1976-01-01

    A comprehensive study of the data collected as part of the environmental Technical Specifications program for Unit 1 of the San Onofre Nuclear Generating Station (SONGS 1) was conducted for the Office of Nuclear Regulatory Research of the U.S. Nuclear Regulatory Commission. The program included an analysis of the hydrothermal and ecological monitoring data collected during 1975. The hydrothermal analysis includes a discussion of models used in plume predictions prior to plant operation and an evaluation of the present hydrothermal monitoring program. The ecological evaluation was directed toward reviewing the strengths and weaknesses of the various sampling programs designed to monitor the planktonic, benthic, and nektonic communities inhabiting the inshore coastal area in the vicinity of San Onofre

  20. Seismic structural fragility investigation for the San Onofre Nuclear Generating Station, Unit 1 (Project I); SONGS-1 AFWS Project

    International Nuclear Information System (INIS)

    Wesley, D.A.; Hashimoto, P.S.

    1982-04-01

    An evaluation of the seismic capacities of several of the San Onofre Nuclear Generating Station, Unit 1 (SONGS-1) structures was conducted to determine input to the overall probabilistic methodology developed by Lawrence Livermore National Laboratory. Seismic structural fragilities to be used as input consist of median seismic capacities and their variabilities due to randomness and uncertainty. Potential failure modes were identified for each of the SONGS-1 structures included in this study by establishing the seismic load-paths and comparing expected load distributions to available capacities for the elements of each load-path. Particular attention was given to possible weak links and details. The more likely failure modes were screened for more detailed investigation

  1. Pressurized thermal shock evaluation of the Calvert Cliffs Unit 1 Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Abbott, L [ed.

    1985-09-01

    An evaluation of the risk to the Calvert Cliffs Unit 1 nuclear power plant due to pressurized thermal shock (PTS) has been completed by Oak Ridge National Laboratory (ORNL) with the assistance of several other organizations. This evaluation was part of a Nuclear Regulatory Commission program designed to study the PTS risk to three nuclear plants, the other two plants being Oconee Unit 1 and H.B. Robinson Unit 2. The specific objectives of the program were to (1) provide a best estimate of the frequency of a through-the-wall crack in the pressure vessel at each of the three plants, together with the uncertainty in the estimated frequency and its sensitivity to the variables used in the evaluation; (2) determine the dominant overcooling sequences contributing to the estimated frequency and the associated failures in the plant systems or in operator actions; and (3) evaluate the effectiveness of potential corrective measures.

  2. Pressurized thermal shock evaluation of the Calvert Cliffs Unit 1 Nuclear Power Plant

    International Nuclear Information System (INIS)

    Abbott, L.

    1985-09-01

    An evaluation of the risk to the Calvert Cliffs Unit 1 nuclear power plant due to pressurized thermal shock (PTS) has been completed by Oak Ridge National Laboratory (ORNL) with the assistance of several other organizations. This evaluation was part of a Nuclear Regulatory Commission program designed to study the PTS risk to three nuclear plants, the other two plants being Oconee Unit 1 and H.B. Robinson Unit 2. The specific objectives of the program were to (1) provide a best estimate of the frequency of a through-the-wall crack in the pressure vessel at each of the three plants, together with the uncertainty in the estimated frequency and its sensitivity to the variables used in the evaluation; (2) determine the dominant overcooling sequences contributing to the estimated frequency and the associated failures in the plant systems or in operator actions; and (3) evaluate the effectiveness of potential corrective measures

  3. Simulators of nuclear power stations

    International Nuclear Information System (INIS)

    Zanobetti, D.

    1984-01-01

    The report deals with the simulators of nuclear power stations used for the training of operators and for the analysis of operations. It reviews the development of analogical, hybrid and digital simulators up to the present, indicating the impact resulting from the TMI-2 accident. It indicates, the components of simulators and the present accepted terminology for a classification of the various types of simulators. It reviews the present state of the art of the technology: how a basic mathematical model of a nuclear power system is worked out and what are the technical problems associated with more accurate models. Examples of elaborate models are given: for a PWR pressurizer, for an AGR steam generator. It also discusses certain problems of hardware technology. Characteristics of present replica simulators are given with certain details: simulated transient evolutions and malfunctions, accuracy of simulation. The work concerning the assessment of the validity of certain simulators is reported. A list of simulator manufacturers and a survey of the principal simulators in operation in the countries of the European Community, in the United States, and in certain other countries are presented. Problem associated with the use of simulators as training facilities, and their use as operational devices are discussed. Studies and research in progress for the expected future development of simulators are reviewed

  4. Water pollution and thermal power stations

    International Nuclear Information System (INIS)

    Maini, A.; Harapanahalli, A.B.

    1993-01-01

    There are a number of thermal power stations dotting the countryside in India for the generation of electricity. The pollution of environment is continuously increasing in the country with the addition of new coal based power stations and causing both a menace and a hazard to the biota. The paper reviews the problems arising out of water pollution from the coal based thermal power stations. (author). 2 tabs

  5. Sources of the wind power stations

    International Nuclear Information System (INIS)

    Chudivani, J.; Huettner, L.

    2012-01-01

    The paper deals with problems of the wind power stations. Describes the basic properties of wind energy. Shows and describes the different types of electrical machines used as a source of electricity in the wind power stations. Shows magnetic fields synchronous generator with salient poles and permanent magnets in the program FEMM. Describes methods for assessing of reversing the effects of the wind power stations on the distribution network. (Authors)

  6. Study Improving Performance of Centrifugal Compressor In Paiton Coal Fired Power Plant Unit 1 And 2

    Science.gov (United States)

    Kusuma, Yuriadi; Permana, Dadang S.

    2018-03-01

    The compressed air system becomes part of a very important utility system in a Plant, including the Steam Power Plant. In PLN’S coal fired power plant, Paiton units 1 and 2, there are four Centrifugal air compressor types, which produce compressed air as much as 5.652 cfm and with electric power capacity of 1200 kW. Electricity consumption to operate centrifugal compressor is 7.104.117 kWh per year. This study aims to measure the performance of Centrifugal Compressors operating in Paiton’s coal fired power plant units 1 and 2. Performance Compressor is expressed by Specific Power Consumption (SPC) in kW/100 cfm. For this purpose, we measure the compressed air flow rate generated by each compressor and the power consumed by each compressor. The result is as follows Air Compressor SAC 2B : 15.1 kW/100 cfm, Air Compressor SAC 1B : 15.31 kW/100 cfm,Air Compressor SAC 1A : 16.3 kW/100 cfm and air Compressor SAC 2C : 18.19 kW/100 cfm. From the measurement result, air compressor SAC 2B has the best performance that is 15.1 kW / 100 cfm. In this study we analyze efforts to improve the performance of other compressors to at least match the performance of the SAC 2B air compressor. By increasing the Specific Power Consumption from others Compressor, it will get energy saving up to 284,165 kWh per year.

  7. Internal event analysis of Laguna Verde Unit 1 Nuclear Power Plant. System Analysis

    International Nuclear Information System (INIS)

    Huerta B, A.; Aguilar T, O.; Nunez C, A.; Lopez M, R.

    1993-01-01

    The Level 1 results of Laguna Verde Nuclear Power Plant PRA are presented in the I nternal Event Analysis of Laguna Verde Unit 1 Nuclear Power Plant , CNSNS-TR-004, in five volumes. The reports are organized as follows: CNSNS-TR-004 Volume 1: Introduction and Methodology. CNSNS-TR-004 Volume 2: Initiating Event and Accident Sequences. CNSNS-TR-004 Volume 3: System Analysis. CNSNS-TR-004 Volume 4: Accident Sequence Quantification and Results. CNSNS-TR-004 Volume 5: Appendices A, B and C. This volume presents the results of the system analysis for the Laguna Verde Unit 1 Nuclear Power Plant. The system analysis involved the development of logical models for all the systems included in the accident sequence event tree headings, and for all the support systems required to operate the front line systems. For the Internal Event analysis for Laguna Verde, 16 front line systems and 5 support systems were included. Detailed fault trees were developed for most of the important systems. Simplified fault trees focusing on major faults were constructed for those systems that can be adequately represent,ed using this kind of modeling. For those systems where fault tree models were not constructed, actual data were used to represent the dominant failures of the systems. The main failures included in the fault trees are hardware failures, test and maintenance unavailabilities, common cause failures, and human errors. The SETS and TEMAC codes were used to perform the qualitative and quantitative fault tree analyses. (Author)

  8. Evaluation of power commissioning of the Mochovce Unit 1 demonstration run

    International Nuclear Information System (INIS)

    Sarvaic, I.; Miskolci, M.

    1998-01-01

    The document contains evaluation of the 144 hour demonstration run of the Mochovce Unit 1. In the document, the courses and results of additional tests in this phase of power commissioning are summarized, evaluation of the performance of important systems and equipment of the unit is carried out, as well as of the compliance with Limits and Conditions in the course of the demonstration run. On this basis, conclusions are drawn and recommendations given for the unit to by ready for trial operation. The evaluation was developed by the scientific management of the Mochovce commissioning providing an independent support for the operators for supervising the commissioning tasks from the point of nuclear safety

  9. Fulton Generating Station Units 1 and 2 (Docket Nos. 50-463 and 50-464): Final environmental statement

    International Nuclear Information System (INIS)

    1975-04-01

    The proposed action is the issuance of construction permits to the Philadelphia Electric Company for the construction of the Fulton Generating Station, Units 1 and 2, located in Fulton and Drumore Townships, Lancaster County, Pennsylvania. Makeup water for cooling will be withdrawn form Conowingo Pond at a maximum rate of 43,000 gpm. The dissolved solids content of the blowdown water will be increased by a factor of about two. The remainder of the water will be evaporated to the atmosphere by cooling towers. About 10 acres offsite, some 7 acres of which is woodland, will be used for railroad-spur construction. About 0.25 mile of new transmission-line rights-of-way (9 acres) will be needed, although 49 miles of new transmission line, which will require about 3 miles of selective clearing, will be constructed on existing rights-of-way. An unestablished amount of land will be used for access-road construction, but the applicant will use existing roadway corridors where feasible. A small loss of consumer species will result from loss of habitat. Some loss of benthic and pelagic organisms in Conowingo Pond will be caused by intake and discharge construction. The Station's thermal and chemical discharges will meet the State water-quality standards. The duration of additional ground-level fog caused by Station operation is expected to be less than 3 hr/year. (Sect. 5.3.3). No observable effects are expected from salt deposition from cooling-tower drift. (Sect. 5.3.3). Decomposers, primary producers, and zooplankton will be entrained and killed in the cooling-tower system; they, as well as benthic organisms, will be affected by the heated-water discharge. This loss will have little effect on the pond food web. 30 figs., 76 tabs

  10. 1100 MW BWR power station

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Now, the start-up test of No. 2 plant in Fukushima No. 2 Nuclear Power Station is smoothly in progress, and the start of its commercial operation is scheduled at the beginning of 1984. Here, the main features of No. 2 plant including piping design are explained. For No. 2 plant, many improving measures were adopted as the base plant of the improvement and standardization project of the Ministry of International Trade and Industry, such as the adoption of Mark-2 improved PCV, the adoption of an intermediate loop in the auxiliary cooling system, one-body forging of the lower end cover of the reactor pressure vessel, the adoption of many curved pipes, the adoption of large one-body structural components in reactor recirculation system piping and so on, which are related to the reduction of radiation exposure and the improvement of plant reliability in operation and regular inspection. Also, in order to do general adjustment in the arrangement of equipment and piping and in route design, and to establish the rational construction work plan, model engineering was adopted. In No. 2 plant, a remote-controlled automatic and semiautomatic ultrasonic flaw detection system was adopted to reduce radiation exposure in in-service inspection. Automatic welding was adopted to improve the quality. (Kako, I.)

  11. Audit Calculations of ATWS for Ulchin Unit 1 and 2 Power Uprate

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jun Soo; Huh, Byung Gil; Choi, Yong Seog; Seul, Kwang Won [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2013-10-15

    In this study, the regulatory audit calculation for ATWS of Ulchin Unit 1 and 2 with 4.5% power uprate was performed to support the licensing review and to confirm the validity of licensee's calculation. In order to simulate the transient behavior of ATWS initiated by a loss of feed water, the systems of Ulchin Unit 1 and 2 was modeled with MARS-KS 1.3. In this study, the regulatory audit calculation of ATWS for Ulchin 1 and 2 with 4.5% power uprating and 99% MTC in the specific cycle designs was performed. It is conformed that the analysis results of ATWS for Ulchin 1 and 2 power uprate meets the RCS pressure acceptance criteria. An anticipated transient accompanied by a failure in the Reactor Trip System (RTS) to shut down the reactor is defined as an Anticipated Transient Without Scram (ATWS). Under certain postulated conditions, the ATWS could lead to Reactor Coolant system (RCS) pressure boundary fracture and/or core damage. For a conventional pressurized water reactor (PWR), the temperature corresponding to the NSSC notice No.2013.09(Performance Criteria for ECCS of the Pressurized Water Reactor Nuclear Power Plants), 1204 .deg. C and the pressure corresponding to the ASME Boiler and Pressure Vessel Code service level C stress, 221.5 bar is assumed to be an unacceptable plant condition against ATWS, above which the RCS pressure boundary could deform to the point of inoperability and the safe shutdown by injection of borated water could be challenged. Such potentially excessive RCS overpressure may occur in the ATWS initiated from a loss of heat sink. Currently, the modification of Ulchin 1 and 2 operating license for 4.5% power uprate is under review.

  12. Level 1 shutdown and low power operation of Mochovce NPP, Unit 1, Slovakia

    International Nuclear Information System (INIS)

    Halada, P.; Cillik, I.; Stojka, T.; Kuzma, M.; Prochaska, J.; Vrtik, L.

    2004-01-01

    The paper presents general approach, used methods and form of documentation of the results that have been applied within the shutdown and low power PSA (SPSA) study for Mochovce NPP, Unit 1, Slovakia. The SPSA project was realized by VUJE Trnava Inc., Slovakia in 2001-2002 years. The Level 1 SPSA study for Mochovce NPP Unit 1 covers internal events as well as internal (fires, floods and heavy load drop) and external (aircraft crash, extreme meteorological conditions, seismic event and influence of surrounding industry) hazards. Mochovce NPP consists of two operating units equipped with VVER 440/V213 reactors safety upgraded before construction finishing and operation start. 87 safety measures based on VVER 440 operational experience and international mission insights were implemented to enhance its operational and nuclear safety. The SPSA relates to full power PSA (FPSA) as a continuation of the effort to create a harmonized level 1 PSA model for all operational modes of the plant with the goal to use it for further purposes as follows: Real Time Risk Monitor, Maintenance Optimization, Technical Specifications Optimization, Living PSA. (author)

  13. Decommissioning of units 1 - 4 at Kozloduy nuclear power plant in Bulgaria

    International Nuclear Information System (INIS)

    Dishkova, Denitsa

    2014-01-01

    Nuclear safety and security are absolute priorities for the European Union countries and this applies not only to nuclear power plants in operation but also to decommissioning. In terms of my technical background and my working experience in the field of licensing and environmental impact assessment during the decommissioning of Units 1 to 4 at Kozloduy Nuclear Power Plant (KNPP) in Bulgaria, I decided to present the strategy for decommissioning of Units 1 to 4 at KNPP which was selected and followed to achieve safe and effective decommissioning process. The selected strategy in each case must meet the legislative framework, to ensure safe management of spent fuel and radioactive waste, to provide adequate funding and to lead to positive socio-economic impact. The activities during the decommissioning generate large volume of waste. In order to minimize their costs and environmental impact it should be given a serious consideration to the choice, the development and the implementation of the most adequate process for treatment and the most appropriate measurement techniques. The licensing process of the decommissioning activities is extremely important and need to cope with all safety concerns and ensure optimal waste management. (authors)

  14. Periodical inspection in nuclear power stations

    International Nuclear Information System (INIS)

    1986-01-01

    Periodical inspection is presently being made of eight nuclear power plants in nuclear power stations. Up to the present time, in three of them, failures as follows have been observed. (1) Unit 3 (PWR) of the Mihama Power Station in The Kansai Electric Power Co., Inc. Nineteen heat-transfer tubes of the steam generators were plugged up due to failure. A fuel assembly with a failed spring fixture and in another the control-rod cluster with a failed control rod fixture were replaced. (2) Unit 2 (PWR) of the Oi Power Station in The Kansai Electric Power Co., Inc. Eight heat-transfer tubes of the heat exchangers were plugged up due to failure. (3) Unit 6 (BWR) of the Fukushima Nuclear Power Station I in The Tokyo Electric Power Co., Inc. A fuel assembly with leakage was replaced. (Mori, K.)

  15. The trip status and the reduction countermeasure in Kori nuclear power plant unit 1 and 2

    International Nuclear Information System (INIS)

    Kim, Jung-Soo

    1991-01-01

    Nuclear power account for 36% of Korea's total electric capacity and provided over 50% of the net electric power supply by June 1991. These plants supply US with the cheapest and most stable electric supply available. However each units capacity is very large and a plant trip due to failure of a component or a human error has a great influence on the nations electric power supply and drastically decreases the reserve margin. This report will analyze the trip causes and measure the trip frequency from the first commercial operation of Kori unit 1 and 2 to the end of June 1991, reflect to the plant operation, management and facility modification, etc. This will minimize the number of trips or urgent power reductions and thus contribute to an increase in plant capacity factor and safety, and stabilize the electric power demand and supply. The safety and the economy of nuclear power plant have to be secured and raised respectably by increasing the capacity factor. Since the prevention of trips plays an important role in the plant safety and economy, we have to do our best to prevent the unexpected trip

  16. Beaver Valley Power Station and Shippingport Atomic Power Station. 1977 annual environmental report: radiological. Volume 2

    International Nuclear Information System (INIS)

    1978-01-01

    The environmental monitoring conducted during 1977 in the vicinity of the Beaver Valley Power Station and the Shippingport Atomic Power Station is described. The environmental monitoring program consists of onsite sampling of water, gaseous, and air effluents, as well as offsite monitoring of water, air, river sediments, and radiation levels in the vicinity of the site. The report discusses releases of small quantities of radioactivity to the Ohio River from the Beaver Valley Power Station and Shippingport Atomic Power Station during 1977

  17. Reliability study of nuclear power stations

    International Nuclear Information System (INIS)

    Nemec, J.; Sedlacek, J.

    1975-01-01

    The paper considers the physical and mathematical bases underlying nuclear power station reliability from the standpoints of material fatigue, thermal yield and ageing. The risk of failure of nuclear power station components is determined by means of the Markov stochastic process

  18. Construction work management for nuclear power stations

    International Nuclear Information System (INIS)

    Yoshikawa, Yuichiro

    1982-01-01

    Nuclear power generation is positioned as the nucleus of petroleum substitution. In the Kansai Electric Power Co., efforts have been made constantly to operate its nuclear power plants in high stability and safety. At present, Kansai Electric Power Co. is constructing Units 3 and 4 in the Takahama Nuclear Power Station in Fukui Prefecture. Under the application of the management of construction works described here, both the nuclear power plants will start operation in 1985. The activities of Kansai Electric Power Co. in the area of this management are described: an outline of the construction works for nuclear power stations, the management of the construction works in nuclear power stations (the stages of design, manufacturing, installation and test operation, respectively), quality assurance activities for the construction works of nuclear power plants, important points in the construction work management (including the aspects of quality control). (J.P.N.)

  19. Westinghouse power distribution monitoring experience at Duke Power's McGuire Unit 1

    International Nuclear Information System (INIS)

    Grobmyer, L.R.; Cash, M.T.; Kitlan, M.S.; Impink, A.J. Jr.

    1987-01-01

    In the evolution of the Westinghouse methodology of assuring safe core power distributions, emphasis was placed on analysis and not on continuous detailed core monitoring. Power distribution monitoring is currently achieved by periodic surveillances using the movable in-core detector system (MIDS) and by continuous observations of the two-section excore power range detectors. Control of the power distribution is regulated by limits on the indications from these systems, by limits on control rod insertion, and by operational constraints on the position indication systems. As more plants come on line and as more utilities take over the fuel design function for themselves, the desire for better core monitoring becomes evident. Also, the need and desire by the utilities to have more control over their operating margin has motivated the industry to offer and/or upgrade core monitoring systems. Westinghouse and Duke Power are participants in a joint development program to finalize the development of the core on-line surveillance monitoring and operations system (COSMOS). This final stage of development consists of prototype field trials at the McGuire Nuclear Plant. The purpose of the prototype program is to determine how well the design objectives are met and how to improve the system based on the operating experience at McGuire. Another purpose of this prototype program is to generate the necessary experience and information to develop a topical report for the US Nuclear Regulatory Commission to obtain a licensing basis for technical specification relaxation

  20. Interim reliability evaluation program: analysis of the Arkansas Nuclear One. Unit 1 Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kolb, G.J.; Kunsman, D.M.; Bell, B.J.

    1982-06-01

    This report represents the results of the analysis of Arkansas Nuclear One (ANO) Unit 1 nuclear power plant which was performed as part of the Interim Reliability Evaluation Program (IREP). The IREP has several objectives, two of which are achieved by the analysis presented in this report. These objectives are: (1) the identification, in a preliminary way, of those accident sequences which are expected to dominate the public health and safety risks; and (2) the development of state-of-the-art plant system models which can be used as a foundation for subsequent, more intensive applications of probabilistic risk assessment. The primary methodological tools used in the analysis were event trees and fault trees. These tools were used to study core melt accidents initiated by loss of coolant accidents (LOCAs) of six different break size ranges and eight different types of transients

  1. Nuclear design report for Ulchin nuclear power plant unit 1, cycle 7

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yong Rae; Park, Yong soo [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-04-01

    This report presents nuclear design calculations for Cycle 7 of Ulchin Unit 1. Information is given on fuel loading, power density distributions, reactivity coefficients, control rod worths and operational limits. In addition, the report contains all necessary data for the startup tests including predicted values for the comparison with the measured data. The reload consists of 56 KOFA`s enriched by nominally 4.00 w/o U{sub 235}. Among the KOFA`s 36 fuel assemblies contain gadolinia rods. The fuel assemblies in the core are arranged in a low leakage loading pattern. The cycle length of Cycle 7 amounts to 355 EFPD corresponding to a cycle burnup of 14280 MWD/MTU. (Author) 8 refs., 55 figs., 21 tabs.

  2. Nuclear design report for Kori nuclear power plant unit 1, cycle 13

    Energy Technology Data Exchange (ETDEWEB)

    Zee, Sung Kyun; Moon, Bok Ja; Cho, Byeong Ho; Jung, Yil Sup [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-04-01

    This report presents nuclear design calculations for cycle 13 of Kori unit 1. Information is given on fuel loading, power density distributions, reactivity coefficients, control rod worths and operational limits. In addition, the report contains all necessary data for the startup tests including predicted values for the comparison with the measured data. The reload consists of 44 KOFA`s enriched by nominally 3.70 w/o U{sub 235}. Among the KOFA`s, 16 fuel assemblies contain gadolinia rods. The fuel assemblies in the core are arranged in a low leakage loading pattern. The cycle length of cycle 13 amounts to 355 EFPD corresponding to a cycle burnup of 13240 MWD/MTU. (Author) 8 refs., 55 figs., 16 tabs.

  3. Nuclear design report for Yonggwang nuclear power plant unit 1 cycle 9

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Young chul; Kim, Jae Hak; Song, Jae Woong [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-03-01

    This report presents nuclear design calculations for Cycle 6 of Yonggwng Unit 1. Information is given on fuel loading, power density distributions, reactivity coefficients, control rod worths and operational limits. In addition, the report contains all necessary data for the startup tests including predicted values for the comparison with the measured data. The reload consists of 76 KOFA`s enriched by nominally 4.00 w/o U{sub 235}. Among the KOFA`s, 60 fuel assemblies contain gadolinia rods. The fuel assemblies in the core are arranged in a low leakage loading pattern. The cycle length of Cycle 9 amounts to 434 EFPD corresponding to a cycle burnup of 17470 MWD/MTU. (Author) 8 refs., 55 figs., 19 tabs.

  4. Nuclear design report for Ulchin nuclear power plant unit 1, cycle 6

    Energy Technology Data Exchange (ETDEWEB)

    Zee, Sung Kyun; Kim, Yong Rae; Park, Yong Soo; Cho, Byeong Ho; Lee, Sang Keun; Ahn, Dawk Hwan [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    This report presents nuclear design calculations for cycle 6 of Ulchin unit 1. Information is given on fuel loading, power density distributions, reactivity coefficients, control rod worths and operational limits. In addition, the report contains all necessary data for the startup tests including predicted values for the comparison with the measured data. The reload consists of 64 KOFA`s enriched by nominally 3.70 w/o U{sub 235}. Among the KOFA`s, 32 fuel assemblies contain gadolinia rods. The fuel assemblies in the core are arranged in a low leakage loading pattern. The cycle length of cycle 6 amounts to 369 EFPD corresponding to a cycle burnup of 14850 MWD/MTU. (Author) 8 refs., 55 figs., 17 tabs.

  5. Nuclear design report for Yonggwang nuclear power plant unit 1, cycle 8

    International Nuclear Information System (INIS)

    Cho, Young Chul; Kim, Jae Hak; Park, Sang Yoon; Zee, Sung Kyun; Lee, Sang Keun; Ahn, Dawk Hwan

    1993-10-01

    This report presents nuclear design calculations for cycle 8 of Kori unit 1. Information is given on fuel loading, power density distributions, reactivity coefficients, control rod worths and operational limits. In addition, the report contains all necessary data for the startup tests including predicted values for the comparison with the measured data. The reload consists of 76 KOFA's enriched by nominally 3.70 w/o U 235 . Among the KOFA's, 56 fuel assemblies contain gadolinia rods. The fuel assemblies in the core are arranged in a low leakage loading pattern. The cycle length of cycle 8 amounts to 447 EFPD corresponding to a cycle burnup of 18020 MWD/MTU. (Author) 8 refs., 39 figs., 17 tabs

  6. Nuclear design report for Yonggwang nuclear power plant unit 1, cycle 8

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Young Chul; Kim, Jae Hak; Park, Sang Yoon; Zee, Sung Kyun; Lee, Sang Keun; Ahn, Dawk Hwan [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-10-01

    This report presents nuclear design calculations for cycle 8 of Kori unit 1. Information is given on fuel loading, power density distributions, reactivity coefficients, control rod worths and operational limits. In addition, the report contains all necessary data for the startup tests including predicted values for the comparison with the measured data. The reload consists of 76 KOFA`s enriched by nominally 3.70 w/o U{sub 235}. Among the KOFA`s, 56 fuel assemblies contain gadolinia rods. The fuel assemblies in the core are arranged in a low leakage loading pattern. The cycle length of cycle 8 amounts to 447 EFPD corresponding to a cycle burnup of 18020 MWD/MTU. (Author) 8 refs., 39 figs., 17 tabs.

  7. Perkins Nuclear Station, Units 1, 2, and 3: Final environmental statement (Docket Nos. STN 50-488, STN 50-489, and STN 50-490

    International Nuclear Information System (INIS)

    1975-10-01

    The proposed action is the issuance of a construction permit to the Duke Power Company for the construction of the Perkins Nuclear Station (PNS) Units 1, 2, and 3 located in Davie County, North Carolina. A total of 2402 acres will be used for the PNS site; another 1401 acres will be used for the Carter Creek Impoundment. Construction-related activities on the primary site will disturb about 617 acres. Approximately 631 acres of land will be required for transmission line right-of-way, and a railroad spur will affect 77 acres. This constitutes a minor local impact. The heat dissipation system will require a maximum water makeup of 55,816 gpm, of which 50,514 gpm will be consumed due to drift and evaporative losses. This amount represents 4% of the mean monthly flow of the Yadkin River. The cooling tower blowdown and chemical effluents from the station will increase the dissolved solids concentration in the Yadkin River by a maximum of 18 ppm. The thermal alterations and increases in total dissolved solids concentration will not significantly affect the aquatic productivity of the Yadkin River. 26 figs., 51 tabs

  8. Tokai earthquakes and Hamaoka Nuclear Power Station

    International Nuclear Information System (INIS)

    Komura, Hiroo

    1981-01-01

    Kanto district and Shizuoka Prefecture are designated as ''Observation strengthening districts'', where the possibility of earthquake occurrence is high. Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc., is at the center of this district. Nuclear power stations are vulnerable to earthquakes, and if damages are caused by earthquakes in nuclear power plants, the most dreadful accidents may occur. The Chubu Electric Power Co. underestimates the possibility and scale of earthquakes and the estimate of damages, and has kept on talking that the rock bed of the power station site is strong, and there is not the fear of accidents. However the actual situation is totally different from this. The description about earthquakes and the rock bed in the application of the installation of No.3 plant was totally rewritten after two years safety examination, and the Ministry of International Trade and Industry approved the application in less than two weeks thereafter. The rock bed is geologically evaluated in this paper, and many doubtful points in the application are pointed out. In addition, there are eight active faults near the power station site. The aseismatic design of the Hamaoka Nuclear Power Station assumes the acceleration up to 400 gal, but it may not be enough. The Hamaoka Nuclear Power Station is intentionally neglected in the estimate of damages in Shizuoka Prefecture. (Kako, I.)

  9. Compressed Air Quality, A Case Study In Paiton Coal Fired Power Plant Unit 1 And 2

    Science.gov (United States)

    Indah, Nur; Kusuma, Yuriadi; Mardani

    2018-03-01

    The compressed air system becomes part of a very important utility system in a Plant, including the Steam Power Plant. In PLN’S coal fired power plant, Paiton units 1 and 2, there are four Centrifugal air compressor types, which produce compressed air as much as 5.652 cfm and with electric power capacity of 1200 kW. Electricity consumption to operate centrifugal compressor is 7.104.117 kWh per year. Compressed air generation is not only sufficient in quantity (flow rate) but also meets the required air quality standards. compressed air at Steam Power Plant is used for; service air, Instrument air, and for fly Ash. This study aims to measure some important parameters related to air quality, followed by potential disturbance analysis, equipment breakdown or reduction of energy consumption from existing compressed air conditions. These measurements include counting the number of dust particles, moisture content, relative humidity, and also compressed air pressure. From the measurements, the compressed air pressure generated by the compressor is about 8.4 barg and decreased to 7.7 barg at the furthest point, so the pressure drop is 0.63 barg, this number satisfies the needs in the end user. The measurement of the number of particles contained in compressed air, for particle of 0.3 micron reaches 170,752 particles, while for the particle size 0.5 micron reaches 45,245 particles. Measurements of particles conducted at several points of measurement. For some point measurements the number of dust particle exceeds the standard set by ISO 8573.1-2010 and also NACE Code, so it needs to be improved on the air treatment process. To see the amount of moisture content in compressed air, it is done by measuring pressure dew point temperature (PDP). Measurements were made at several points with results ranging from -28.4 to 30.9 °C. The recommendation of improving compressed air quality in steam power plant, Paiton unit 1 and 2 has the potential to extend the life of

  10. 77 FR 13156 - Carolina Power & Light Company; Shearon Harris Nuclear Power Plant, Unit 1; Exemption

    Science.gov (United States)

    2012-03-05

    ... generation, and cladding oxidation from the metal/water reaction shall be calculated using the Baker-Just... boiling or pressurized light-water nuclear power reactor fueled with uranium oxide pellets within... spring 2012. The AREVA fuel design consists of low enriched uranium oxide fuel within M5 \\TM\\ zirconium...

  11. MHD power station with coal gasification

    International Nuclear Information System (INIS)

    Brzozowski, W.S.; Dul, J.; Pudlik, W.

    1976-01-01

    A description is given of the proposed operating method of a MHD-power station including a complete coal gasification into lean gas with a simultaneous partial gas production for the use of outside consumers. A comparison with coal gasification methods actually being used and full capabilities of power stations heated with coal-derived gas shows distinct advantages resulting from applying the method of coal gasification with waste heat from MHD generators working within the boundaries of the thermal-electric power station. (author)

  12. Environmental surveillance of PWR power stations

    International Nuclear Information System (INIS)

    Conti, M.

    1980-01-01

    The action of Electricite de France with respect to the environment of PWR nuclear power stations is essentially centred on prevention. Controls are carried out at two levels: - before the power station goes on stream (radioecological study), - when the power station is operational. The purpose of the controls effected on the radioactive effluents and the environment is to check that the maximum discharge rate stipulated in the corresponding orders is complied with and to ensure that there are no anomalies in the environment [fr

  13. Revised draft environmental statement related to construction of Atlantic Generating Station Units 1 and 2 (Docket Nos. STN 50-477 and STN 50-478)

    International Nuclear Information System (INIS)

    1976-10-01

    The proposed action is the issuance of a construction permit to Public Service Electric and Gas Company (PDE and G) for the construction of the Atlantic Generating Station (AGS), Units 1 and 2. The AGS is the first nuclear power station in the United States proposed for construction in the offshore waters on the continental shelf. The AHS will be located in the Atlantic Ocean 2.8 miles offshore of Atlantic and Ocean countries. New Jersey, 11 miles northeast of Atlantic City, and will consist of two floating nuclear power plants enclosed in a protective rubble-mound breakwater. Both plants will be identical, of standardized design, and will employ pressurized water reactors to produce up to approximately 3425 megawatts thermal (MWt) each. Steam turbine generators will use this heat to produce up to approximately 1150 megawatts of electrical power (MWe) per unit. The main condensers will be cooled by the flow of seawater drawn from within the breakwater and discharged shoreward and external to the breakwater. This statement identifies various environmental aspects and potential adverse effects associated with the construction and operation of the AGS. Based upon an approximate two-year review period which included a multidisciplined assessment of extensive survey and modeling data, these effects are considered by the staff to be of a generally acceptable nature. Breakwater construction will result in the destruction of 100 acres of benthic infauna (burrowing animals) and the development of a reef-type community on the breakwater. The production of new biomass (standing crop) by the reef community is expected to compensate for the infaunal biomass destroyed by dredging and will contribute mainly to the local sport fishery. 93 figs., 110 tabs

  14. Space power station. Uchu hatsuden

    Energy Technology Data Exchange (ETDEWEB)

    Kudo, I. (Electrotechnical Laboratory, Tsukuba (Japan))

    1993-02-20

    A calculation tells that the amount of electric power the world will use in the future will require 100 to 500 power plants each with an output of 5-GW class. If this conception is true, it is beyond dispute that utilizing nuclear power will constitute a core of the power generation even though the geographical conditions are severe for nuclear power plants. It is also certain that power generation using clean solar energy will play important roles if power supply stability can be achieved. This paper describes plans to develop space solar power generation and space nuclear power generation that can supply power solving problems concerning geographical conditions and power supply stability. The space solar power generation is a system to arrest solar energy on a static orbit. According to a result of discussions in the U.S.A., the plan calls for solar cell sheets spread over the surface of a structure with a size of 5 km [times] 10 km [times] 0.5 km thick, and electric power obtained therefrom is transmitted to a rectenna with a size of 10 km [times] 13 km, a receiving antenna on the ground. The space nuclear power generation will be constructed similarly on a static orbit. Researches on space nuclear reactors have already begun. 10 refs., 8 figs., 1 tab.

  15. Sizewell B Power Station control dosimetry system

    International Nuclear Information System (INIS)

    Renn, G.

    1995-01-01

    Sizewell B Power Station is the first Pressurized Water Reactor (PWR) built in the UK for commercial electricity production. An effective control dosimetry system is a crucial tool, in allowing the station to assess its radiological performance against targets. This paper gives an overview of the control dosimetry system at Sizewell B and describes early operating experience with the system. (UK)

  16. Extension of life of nuclear power stations

    International Nuclear Information System (INIS)

    Takahashi, Hideaki

    1991-01-01

    At the time of designing nuclear power stations, as their service life, generally 40 years are taken, and the basic design specifications of machinery and equipment are determined. In USA where atomic energy has been developed, the new construction of nuclear power stations is cased for a while, however, if this situation continues as it is, since old power stations reach the service life of 40 years and are retired in near future, it is feared that the circumstance of the total amount of power generation becoming short will occur. As one of the countermeasures to this, the research on the extension of life of nuclear power stations has been carried out in many fields in USA, and it is expected that the application for extending the life for the power stations constructed in the initial period of development is submitted in 1991. The researches that have been carried out for solving the technical problems in this extension of life and the situation in Japan are reported. The NEC of USA decided that the operation period of nuclear power stations in USA, which is considered to be 40 years so far, can be extended up to the limit of 20 years. The background and circumstances of this problem in USA, Nuclear Plant Aging Research Program, Plant Life Extension Program and so on are reported. (K.I.)

  17. Measures to assess and to assure the integrity of RPV-internals at Isar, Unit 1 Nuclear Power Plant

    International Nuclear Information System (INIS)

    Erve, M.; Bouecke, R.; Leibold, F.; Marschke, D.; Senski, G.; Maier, V.

    1998-01-01

    As visual examinations carried out in autumn 1994 detected cracks in a German BWR plant due to intergranular stress corrosion cracking in several core shroud components manufactured from 1.4550 steel, precautionary examinations and assessments were performed for all other plants. In accordance with these analyses, it can be stated for Isar, Unit 1 that the heat treatment to which the components in question were subjected in the course of manufacture cannot have caused sensitization of the material, and that crack formation due to the damage mechanism primarily identified in the reactor pressure vessel internals at Wuergassen Nuclear Power Station need not be feared. Although the material and corrosion-chemical assessments performed to date did not give any indications for the other crack formation mechanisms that are theoretically relevant for reactor pressure vessel internals (IGSCC due to weld sensitization, IASCC), visual examinations with a limited scope will be carried out with the independent expert's agreement during the scheduled inservice inspections. The fluid-dynamic and structure-mechanical analyses showed that the individual components are subjected only to low loadings, even in the event of accidents, and that the safety objectives shutdown and residual heat removal can be fulfilled even in the case of large postulated cracks. The fracture-mechanics analyses indicated critical through-wall crack lengths which, however, can be promptly and reliably detected during random inservice inspections even when assuming stress corrosion cracking and irradiation-induced low-toughness material conditions. In addition, both the VGB and the Isar, Unit 1 licensee are pursuing further prophylactic measures such as alternative water chemistry modes and an appropriate repair and replacement concept. (author)

  18. Valves and fittings for nuclear power stations

    International Nuclear Information System (INIS)

    1976-01-01

    The standard specifies technical requirements for valves and pipe fittings in nuclear power stations with PWR type reactors. Details of appropriate materials, welding, surface treatment for corrosion protection, painting, and complementary supply are given

  19. Anticorrosional protection in nuclear power station objects

    International Nuclear Information System (INIS)

    Czarnocki, A.; Kwiatkowski, A.

    1976-01-01

    The distribution and qualities of chemical protection and demands concerning preparation of the bottom for protecting coats in nuclear power station objects are discussed. The solutions of protections applied abroad and in the objects of ''MARIA'' reactor are presented. (author)

  20. Heating of water by nuclear power stations

    International Nuclear Information System (INIS)

    1974-01-01

    The aim of this note is to examine: the thermal conditions of the Rhone in its present state; heating caused by the building of nuclear power stations; the main hydrobiological and ecological characteristics of the Rhone [fr

  1. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement 2

    International Nuclear Information System (INIS)

    1984-10-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the applicant) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on a site in Montgomery and Chester Counties, Pennsylvania. This supplement addresses further issues that require resolution and closes them out

  2. Technical specifications for Grand Gulf Nuclear Station, Unit 1 (Docket No. 50-416). Appendix A to License No. NPF-13

    International Nuclear Information System (INIS)

    1984-08-01

    The Grand Gulf Nuclear Station, Unit 1 Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions and other requirements applicable to a nuclear facility as set forth in Section 50.36 of 10 CFR part 50 for the protection of the health and safety of the public

  3. Training of power station staff

    International Nuclear Information System (INIS)

    Dusserre, J.

    1993-01-01

    ELECTRICITE DE FRANCE currently operates 51 generating stations with 900 and 1300 MW Pressurized Water Reactors while, only 15 years ago, France possessed only a very small number of such stations. It was therefore vital to set up a major training organization to produce staff capable of starting, controlling and maintaining these facilities with a constant eye to improving quality and safety. Operator and maintenance staff training is based on highly-structured training plans designed to match both the post to be filled and the qualifications possessed by the person who is to fill it. It was essential to set up suitable high-performance training resources to handle this fast growth in staff. These resources are constantly being developed and allow EDF to make steady progress in a large number of areas, varying from the effects of human factors to the procedures to be followed during an accident

  4. Solidifying power station resins and sludges

    International Nuclear Information System (INIS)

    Willis, A.S.D.; Haigh, C.P.

    1984-01-01

    Radioactive ion exchange resins and sludges arise at nuclear power stations from various operations associated with effluent treatment and liquid waste management. As the result of an intensive development programme, the Central Electricity Generating Board (CEGB) has designed a process to convert power station resins and sludges into a shielded, packaged solid monolithic form suitable for final disposal. Research and development, the generic CEGB sludge/resin conditioning plant and the CEGB Active Waste Project are described. (U.K.)

  5. Energy analysis of nuclear power stations

    International Nuclear Information System (INIS)

    Lindhout, A.H.

    1975-01-01

    A study based on a 1000MWe light water reactor power station was carried out to determine the total energy input and output of the power station. The calculations took into account the mining and processing of the ore, enrichment of the uranium, treatment of used nuclear fuel, investment in land, buildings, machinery, and transport. 144 tons of natural uranium produce 6100 million kWh (electric) and 340 million kWh (thermal) per annum. (J.S.)

  6. Technical evaluation report on the adequacy of station electric distribution system voltages for the Point Beach Nuclear Plant, Units 1 and 2. (Docket Nos. 50-266, 50-301)

    International Nuclear Information System (INIS)

    White, R.L.

    1983-01-01

    This report documents the technical evaluation of the adequacy of the station electric distribution system voltages for the Point Beach Nuclear Plant, Units 1 and 2. The evaluation is to determine if the onsite distribution system, in conjunction with the offsite power sources, has sufficient capacity to automatically start and operate all Class 1E loads within the equipment voltage ratings under certain conditions established by the Nuclear Regulatory Commission. For the worst case conditions study submitted by the licensee, it was shown that the station electric distribution system voltages would be adequate to start and operate 4160-volt and 480-volt Class 1E loads and their associated low voltage controls

  7. Marble Hill Nuclear Generating Station, Units 1 and 2: Final environmental statement (Docket Nos. STN 50-546 and STN 50-547)

    International Nuclear Information System (INIS)

    1976-09-01

    The proposed action is the issuance of construction permits to the Public Service Company of Indiana, Inc., Northern Indiana Public Service Company, Inc., East Kentucky Power Cooperative, Inc., and Wabash Valley Power Association for the construction of the Marble Hill Nuclear Generating Station, Units 1 and 2 (MH 1and2). The 987-acre site is predominately forest and cropland. Construction-related activities on the site would disturb about 250 acres. The portion of this land not be used for the plant facilities, parking lots, roads, etc., will be restored by seeding and landscaping. The temporary removal of vegetation will tend to promote erosion. Increased siltation and turbidity can be expected in local streams during construction, but measures will be taken to minimize these effects. A maximum of 69 cfs of cooling water will be withdrawn from the Ohio River of which cfs will be returned to the river via pipeline with the dissolved solids concentration increased by a factor of about 6. About cfs will be evaporated to the atmosphere by the cooling towers. The volume of discharge (9 cfs) is very small compared with the river flow (annual mean is about 110,000 cfs) and the thermal effect on the river ecosystem is not expected to be significant. Chemical discharges from the plant will be diluted to concentrations below those which might adversely affect aquatic biota. The risk associated with accidental radiation exposure will be very low. 43 figs., 115 tabs

  8. Principles of nuclear power station control

    International Nuclear Information System (INIS)

    Knowles, J.B.

    1975-12-01

    This memorandum represents lecture notes first distributed as part of a UKAEA introductory course on Reactor Technology held during November 1975. A nuclear power station is only one element of a dispersed interconnected arrangement of other nuclear and fossil-fired units which together constitute the national 'grid'. Thus the control of any one station must relate to the objectives of the grid network as a whole. A precise control of the supply frequency of the grid is achieved by regulating the output power of individual stations, and it is necessary for each station to be stable when operating in isolation with a variable load. As regards individual stations, several special control problems concerned with individual plant items are discussed, such as: controlled reactivity insertions, temperature reactivity time constants and flow instability. A simplified analysis establishes a fundamental relationship between the stored thermal energy of a boiler unit (a function of mechanical construction) and the flexibility of the heat source (nuclear or fossil-fired) if the station is to cope satisfactorily with demands arising from unscheduled losses of other generating sets or transmission capacity. Two basic control schemes for power station operation are described known as 'coupled' and 'decoupled control'. Each of the control modes has its own merits, which depend on the proposed station operating strategy (base load or load following) and the nature of the heat source. (U.K.)

  9. Analogue to digital upgrade project-boiler feedwater control system for Bruce Power nuclear units 1 & 2

    International Nuclear Information System (INIS)

    Long, R.

    2012-01-01

    Bruce Power Nuclear Generating Station A, “Bruce A” is in the final stages of its Restart Project. This capital project will see a large scale rehabilitation of Units 1 and 2 resulting in addition of 1500MW of safe, reliable, clean electricity to the Ontario grid. Restart Project Scope 375, Boiler Feedwater Controls Upgrade was sanctioned to replace obsolete analog devices with a modern digital control system. This project replaced the existing Foxboro H Line analog controls which comprised of 81 individual control modules and support instrumentation. The replacement system was a Triconex Triple Modular Redundant PLC which interfaces with two redundant touch screen monitors. The upgraded digital system incorporates the following controls: 1. Boiler Level Control Loops 2. Dearator Level Control Loops 3. Dearator Pressure Control Loops 4. Boiler Feedwater Recirculation Flow Control Loops A number of technical challenges were addressed when installing a new digital system within the existing plant configuration. Interfaces to new, old and refurbished field devices must be understood as well as implications of connecting to the plant’s Digital Control Computers (DCC’s) and newly installed Steam Generators. The overall project involved many stakeholders to address various requirements from conceptual / design stage through procurement, construction, commissioning and return to service. In addition, the project highlighted the unique requirements found in Nuclear Industry with respect to Human Factors and Software Quality Assurance. (author)

  10. Starting of nuclear power stations

    International Nuclear Information System (INIS)

    Kotyza, V.

    1988-01-01

    The procedure is briefly characterized of jobs in nuclear power plant start-up and the differences are pointed out from those used in conventional power generation. Pressure tests are described oriented to tightness, tests of the secondary circuit and of the individual nodes and facilities. The possibility is shown of increased efficiency of such jobs on an example of the hydraulic tests of the second unit of the Dukovany nuclear power plant where the second and the third stages were combined in the so-colled integrated hydraulic test. (Z.M.). 5 figs

  11. Plastic solidification system at Hamaoka Nuclear Power Station

    International Nuclear Information System (INIS)

    Okajima, Hiroyuki; Iokibe, Hiroyuki; Tsukiyama, Shigeru; Suzuki, Michio; Yamaguchi, Masato

    1987-01-01

    In Unit 1 and 2 of the Hamaoka Nuclear Power Station, radioactive waste was previously solidified in cement. By this method, the quantity of waste thus treated is relatively small, resulting in large number of the solidified drums. In order to solve this problem, the solidification facility using a thermosetting resin was employed, which is in operation since January 1986 for Unit 1, 2 and 3. As compared with the cement solidification, the solidified volume of concentrated liquid is about 1/12 and of spent-resin slurry is about 1/4 in plastic solidification. The following are described: course leading to the employment, the plastic solidification facility, features of the facility, operation results so far with the facility, etc. (Mori, K.)

  12. Nuclear design report for Kori nuclear power plant unit 1, cycle 14

    Energy Technology Data Exchange (ETDEWEB)

    Park, Chan Oh; Kim, Joo Young; Park, Sang Yoon; Song, Jae Woong; Lee, Chong Chul; Baik, Joo Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-06-01

    This report presents nuclear design calculations for cycle 14 of Kori unit 1. Information is given on fuel loading, power density distributions, reactivity coefficients, control rod worths and operational limits. In addition, the report contains all necessary data for the startup tests including predicted values for the comparison with the measured data. The reload consists of 44 KOFA`s enriched by nominally 3.70 w/o U{sub 235}. Among the KOFA`s, 16 fuel assemblies contain gadolinia rods. The fuel assemblies in the core are arranged in a low leakage loading pattern. The cycle length of cycle 14 amounts to 366 EFPD corresponding to a cycle burnup of 13680 MWD/MTU. (Author) 8 refs., 55 figs., 16 tabs. nozzle by vortex formation during mid-loop operation condition are experimentally investigated. The critical submergence is determined for various types of suction nozzle, and the measurements of velocity distribution are performed in the flow fields near the t-shaped suction nozzle. (Author) 11 refs., 41 figs., 13 tabs.

  13. 78 FR 14361 - In the Matter of Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant, Units 1 and...

    Science.gov (United States)

    2013-03-05

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0310; Docket Nos. 50-445 and 50-446; License Nos. NPF-87 and NPF-89] In the Matter of Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant, Units... Nuclear Power Plant, Units 1 and 2 (CPNPP), and its Independent Spent Fuel Storage Installation Facility...

  14. Small hydroelectric power stations and their reality

    International Nuclear Information System (INIS)

    Kamenski, Miroslav

    1999-01-01

    Construction of a small hydroelectric power station provides additional amounts of electric energy, engages a private capital, revives investment activities and promotes the use of renewable energy sources. Transmission losses are reduced, a voltage of higher quality is achieved and idle power is compensated by the generation of electricity in the small hydroelectric power stations and at the place of consumption. Legislation and technical regulations, however, require a multidisciplinary approach, defining of complex spaces and environmental protection. Unfortunately, complete documents should be prepared for small,hydroelectric plants just as for big ones what is a long procedure and many of those papers are unnecessary or even superfluous. (Author)

  15. Distributed systems for protecting nuclear power stations

    International Nuclear Information System (INIS)

    Jover, P.

    1980-05-01

    The advantages of distributed control systems for the control of nuclear power stations are obviously of great interest. Some years ago, EPRI, (Electric Power Research Institute) showed that multiplexing the signals is technically feasible, that it enables the availability specifications to be met and costs to be reduced. Since then, many distributed control systems have been proposed by the manufacturers. This note offers some comments on the application of the distribution concept to protection systems -what should be distributed- and ends with a brief description of a protection system based on microprocessors for the pressurized power stations now being built in France [fr

  16. Power station stack gas emissions

    International Nuclear Information System (INIS)

    Hunwick, Richard J.

    2006-01-01

    There are increasing awareness and pressure to reduce emissions of acid rain and photochemical smog. There is a need to produce new control system and equipment to capture those emissions. The most visible form of pollutions are the chimney smoke, dust and particles of fly ash from mineral matter in the fuel. Acid gases are hard on structures and objects containing limestone. Coal fired power generation is likely to be able to sustain its competitive advantage as a clean source of electricity in comparison with nuclear power and natural gas

  17. Public exposure from environmental release of radioactive material under normal operation of unit-1 Bushehr nuclear power plant

    International Nuclear Information System (INIS)

    Sohrabi, M.; Parsouzi, Z.; Amrollahi, R.; Khamooshy, C.; Ghasemi, M.

    2013-01-01

    Highlights: ► The unit-1 Bushehr nuclear power plant is a VVER type reactor with 1000 MWe power. ► Doses of public critical groups living around the plant were assessed under normal reactor operation conditions. ► PC-CREAM 98 computer code developed by the HPA was applied to assess the public doses. ► Doses are comparable with those in the FSAR, in the ER and doses monitored. ► The doses assessed are lower than the dose constraint of 0.1 mSv/y associated with the plant. - Abstract: The Unit-1 Bushehr Nuclear Power Plant (BNPP-1), constructed at the Hallileh site near Bushehr located at the coast of the Persian Gulf, Iran, is a VVER type reactor with 1000 MWe power. According to standard practices, under normal operation conditions of the plant, radiological assessment of atmospheric and aquatic releases to the environment and assessment of public exposures are considered essential. In order to assess the individual and collective doses of the critical groups of population who receive the highest dose from radioactive discharges into the environment (atmosphere and aquatic) under normal operation conditions, this study was conducted. To assess the doses, the PC-CREAM 98 computer code developed by the Radiation Protection Division of the Health Protection Agency (HPA; formerly called NRPB) was applied. It uses a standard Gaussian plume dispersion model and comprises a suite of models and data for estimation of the radiological impact assessments of routine and continuous discharges from an NPP. The input data include a stack height of 100 m annual radionuclides release of gaseous effluents from the stack and liquid effluents that are released from heat removal system, meteorological data from the Bushehr local meteorological station, and the data for agricultural products. To assess doses from marine discharges, consumption of sea fish, crustacean and mollusca were considered. According to calculation by PC-CREAM 98 computer code, the highest individual

  18. Nuclear power station achievement 1968-1980

    International Nuclear Information System (INIS)

    Howles, L.R.

    This report reviews and gives an analysis of the achievement of operating nuclear power stations in the Western world on three relevant bases: (1) both annual and cumulative achievement of all nuclear power stations at a particular time; (2) cumulative achievement of all nuclear power stations at the end of the first and subsequent years of their lives to show trends with age; (3) achievement based on refuelling period considerations. Nowhere in the report are any operating details ignored, omitted or eliminated in the method of analysis. Summarising the results of the reviews shows: an improvement with time from initial electricity generation on all bases; that initially, larger sizes of reactor/turbine operate less well than smaller sizes (except for PHWR's); that after an initial number of years, the largest size units operate as well as the intermediate and smaller sizes, or better in the PHWR case; that a 75 per cent cumulative load factor achievement in the middle years of a reactor/turbines life can be expected on the refuelling period considerations base; that at June 1980, 35 nuclear power stations achieved an annual load factor over 75 per cent; that the above achievement was possible despite the repercussions following the Three Mile Island 'accident' and the shutdowns in the USA for piping system seismic adequacy checks required by the Nuclear Regulatory Commission for five nuclear power stations; and that even when reactors/turbines are reaching towards the end of their design life, there is no rapid deterioration in their achievements. (author)

  19. Error management process for power stations

    International Nuclear Information System (INIS)

    Hirotsu, Yuko; Takeda, Daisuke; Fujimoto, Junzo; Nagasaka, Akihiko

    2016-01-01

    The purpose of this study is to establish 'error management process for power stations' for systematizing activities for human error prevention and for festering continuous improvement of these activities. The following are proposed by deriving concepts concerning error management process from existing knowledge and realizing them through application and evaluation of their effectiveness at a power station: an entire picture of error management process that facilitate four functions requisite for maraging human error prevention effectively (1. systematizing human error prevention tools, 2. identifying problems based on incident reports and taking corrective actions, 3. identifying good practices and potential problems for taking proactive measures, 4. prioritizeng human error prevention tools based on identified problems); detail steps for each activity (i.e. developing an annual plan for human error prevention, reporting and analyzing incidents and near misses) based on a model of human error causation; procedures and example of items for identifying gaps between current and desired levels of executions and outputs of each activity; stages for introducing and establishing the above proposed error management process into a power station. By giving shape to above proposals at a power station, systematization and continuous improvement of activities for human error prevention in line with the actual situation of the power station can be expected. (author)

  20. Final environmental statement for William B. McGuire Nuclear Station, Units 1 and 2: (Docket Nos. 50-369 and 50-370)

    International Nuclear Information System (INIS)

    1976-04-01

    The proposed action is the issuance of operating licenses to the Duke Power Company for the startup and operation of the William B. McGuire Nuclear Station, Units 1 and 2 (the plant) located on the Lake Norman in Mecklenburg County, 17 miles north-northwest of Charlotte, North Carolina. The units will be cooled by once-through flow of water from Lake Norman. Two units, each with a net electrical capacity of 1180 MWe will be added to the resources of the Duke Power Company. This will have a favorable effect on reserve margins and provide a cost savings of $77 to $122 million in production costs in 1979 if the units come on line as scheduled, and cost savings in subsequent years. Approximately 200 acres of rural, partially wooded land owned by the applicant will be unavailable for other uses during the 40-year life of the plant. Approximately 61.6 acres of additional land will be utilized for transmission line corridors and/or switchyard and maintained under controlled conditions. Land-use patterns will necessarily conform to the needs of the application but will not be changed significantly from present usage. At full power, condenser cooling water could be heated to as high as 96/degree/F (35.6/degree/C) as a monthly average and will be discharged at a rate of up to 4492 cfs. The temperature rise of the water will be 16/degree/F (8.8/degree/C) to 32/degree/F (17.8/degree/C) above ambient. The heated water will mix with the cooler water of Lake Norman, where the heat will be dissipated to the atmosphere. The increase in temperature will cause a loss of approximately 31 cfs of water as a result of increased evaporation. 26 figs., 46 tabs

  1. Socioeconomic impacts: nuclear power station siting

    International Nuclear Information System (INIS)

    1977-06-01

    The rural industrial development literature is used to gain insights on the socioeconomic effects of nuclear power stations. Previous studies of large industrial facilities in small towns have important implications for attempts to understand and anticipate the impacts of nuclear stations. Even a cursory review of the nuclear development literature, however, reveals that industrialization research in rural sociology, economic geography and agricultural economics has been largely ignored

  2. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Summary of results. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Whitehead, D.W. [ed.; Staple, B.D.; Daniel, S.L. [and others

    1995-07-01

    During 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to examine the potential risks during low power and shutdown operations. Two plants, Surry and Grand Gulf, were selected as the plants to be studied by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). This report documents the work performed during the analysis of the Grand Gulf plant. A phased approach was used for the overall study. In Phase 1, the objectives were to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenario frequencies and risks, and to provide a foundation for a detailed Phase 2 analysis. It was in Phase 1 that the concept of plant operational states (POSs) was developed to allow the analysts to better represent the plant as it transitions from power operation to nonpower operation than was possible with the traditional technical specification divisions of modes of operation. This phase consisted of a coarse screening analysis performed for all POSs, including seismic and internal fire and flood for some POSs. In Phase 2, POS 5 (approximately cold shutdown as defined by Grand Gulf Technical Specifications) during a refueling outage was selected as the plant configuration to be analyzed based on the results of the Phase 1 study. The scope of the Level 1 study includes plant damage state analysis and uncertainty analysis and is documented in a multi-volume NUREG/CR report (i.e., NUREG/CR-6143). The internal events analysis is documented in Volume 2. Internal fire and internal flood analyses are documented in Volumes 3 and 4, respectively. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. The Level 2/3 study of the traditional internal events is documented in Volume 6, and a summary of the results for all analyses is documented in Volume 1.

  3. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Summary of results. Volume 1

    International Nuclear Information System (INIS)

    Whitehead, D.W.; Staple, B.D.; Daniel, S.L.

    1995-07-01

    During 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to examine the potential risks during low power and shutdown operations. Two plants, Surry and Grand Gulf, were selected as the plants to be studied by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). This report documents the work performed during the analysis of the Grand Gulf plant. A phased approach was used for the overall study. In Phase 1, the objectives were to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenario frequencies and risks, and to provide a foundation for a detailed Phase 2 analysis. It was in Phase 1 that the concept of plant operational states (POSs) was developed to allow the analysts to better represent the plant as it transitions from power operation to nonpower operation than was possible with the traditional technical specification divisions of modes of operation. This phase consisted of a coarse screening analysis performed for all POSs, including seismic and internal fire and flood for some POSs. In Phase 2, POS 5 (approximately cold shutdown as defined by Grand Gulf Technical Specifications) during a refueling outage was selected as the plant configuration to be analyzed based on the results of the Phase 1 study. The scope of the Level 1 study includes plant damage state analysis and uncertainty analysis and is documented in a multi-volume NUREG/CR report (i.e., NUREG/CR-6143). The internal events analysis is documented in Volume 2. Internal fire and internal flood analyses are documented in Volumes 3 and 4, respectively. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. The Level 2/3 study of the traditional internal events is documented in Volume 6, and a summary of the results for all analyses is documented in Volume 1

  4. New Zealand's Clyde power station

    Energy Technology Data Exchange (ETDEWEB)

    Hatton, J W; Black, J C; Foster, P F

    1987-12-01

    A 100 m-high mass concrete gravity dam, for the generation of 432 MW of power, is under construction at Clyde on the Clutha River in the South Island of New Zealand. A feature of the dam is the provision of a slip joint to allow up to 2 m of movement on the plane of a fault passing through the dam foundation. Details of the dam foundations, seismic design, river channel fault and slip joint, mass concrete, spillway and sluice, powerhouse, and landslide hazard at the site are given. 3 refs.

  5. The Grossmatt hydro-power station

    International Nuclear Information System (INIS)

    Hintermann, M.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the project for a small hydropower station on the Birs river in north-western Switzerland. The report reviews the history of the project, in which a new 385 kW-hydro-power station at the site of an earlier installation is foreseen. Details are presented on the investigations made and on the co-ordination with the owners of the hydro-power station situated up-river, the local power utility and the local authorities. Also, the requirements placed on the project by the fishing authorities are quoted and the solution foreseen is described. Also discussed are the requirements placed on the project by legislation on environmental impact and flood protection. Figures on electrical energy production and building costs are presented

  6. Safety aspects of nuclear power stations

    International Nuclear Information System (INIS)

    Binner, W.

    1980-01-01

    Psychological aspects of the fear of nuclear power are discussed, cancer deaths due to a nuclear accident are predicted and the need for nuclear accident prevention is stressed. A simplified analysis of the safety precautions in a generalised nuclear power station is offered, with reference to loss-of-coolant incidents, and developments in reactor design for fail-safe modes are explained. The importance of learning from the Three Mile Island incident is noted and failure statistics are presented. Tasks to be undertaken at the Austrian Zwentendorf nuclear power station are listed, including improved quality control and acoustic detectors. Precautions against earthquakes are also discussed and it is stated that safe operation of the Zwentendorf station will be achieved. (G.M.E.)

  7. Can we afford shutting down power stations?

    International Nuclear Information System (INIS)

    Hesse, David

    2015-01-01

    The author discusses and criticizes some popular beliefs on the profitability of nuclear power stations, on the fact that they are now too old to be exploited, and on the fact that nuclear energy is the most subsidised energy. As some European countries decided to phase out nuclear, he notices that the decrease of gas prices undermines the profitability of nuclear power stations in the USA and that new rules aimed at the reduction of CO 2 emissions result in high subsidies for renewable energies which are however handicapped by the grid ability to integrate all energies. He outlines that shutting down a nuclear power station costs a lot of money to the society, and denies the argument of non-profitability of these stations. He states that the issue of nuclear subsidies is in fact a matter of tax policy. He also states that these so-said old power stations take in fact advantage of numerous technical innovations for their equipment, components, technology and fuels which improve their efficiency, durability, performance and flexibility

  8. Nuclear power generation modern power station practice

    CERN Document Server

    1971-01-01

    Nuclear Power Generation focuses on the use of nuclear reactors as heat sources for electricity generation. This volume explains how nuclear energy can be harnessed to produce power by discussing the fundamental physical facts and the properties of matter underlying the operation of a reactor. This book is comprised of five chapters and opens with an overview of nuclear physics, first by considering the structure of matter and basic physical concepts such as atomic structure and nuclear reactions. The second chapter deals with the requirements of a reactor as a heat source, along with the diff

  9. Operational results in the Onagawa Nuclear Power Station

    International Nuclear Information System (INIS)

    Hasegawa, Kanichi; Kato, Katsuya; Terada, Hideo; Kamata, Takakage; Kaimura, Yoshiharu

    1986-01-01

    In the Onagawa Nuclear Power Station, Unit 1 (BWR type, with electric output 524 MW) started operation in June 1, 1984. The power plant has then continued non-stop operation up to April 2, 1985, thus exhibiting its base load plant. In fiscal 1984, the continuous operation is for 342 days; the capacity factor is about 96.1 %, which is the world's top. During the period, the radioactivity releases to the environment in both liquid and gaseous wastes are below the detection limits. The collective exposure dose for plant personnel is merely 6 man-rem. Subsequently, its 1st periodical inspection was started on April 3, 1985, and finished in July the same year. So, the power plant is now again in operation. (Mori, K.)

  10. Developmental state and perspectives of USSR power stations, espec. nuclear power stations

    International Nuclear Information System (INIS)

    1983-01-01

    According to the resolutions of the 25th and 26th party congresses of the CPSU, the Soviet electric and thermal energy economy envisages as the mainstreams in development: Energy projects based on nuclear fuel, i.e. nuclear power stations (NPS), nuclear heat- and -power stations (NHPS) and nuclear heat stations (NHS); fuel-energy complexes: Ekibastuz, Kansk-Achinsk, West-Siberian complex (Tyumen); power stations utilizing non-conventional regenerative energy sources, i.e. solar, geothermal, MHD power stations. Further down, an overview is given on the developmental perspectives of nuclear-heat and nuclear-power economy and on the development of energy management based on fossil fuels. (orig./UA) [de

  11. Beaver Valley Power Station and Shippingport Atomic Power Station. 1984 Annual environmental report, radiological. Volume 2

    International Nuclear Information System (INIS)

    1985-01-01

    This report describes the Radiological Environmental Monitoring Program conducted during 1984 in the vicinity of the Beaver Valley Power Station and the Shippingport Atomic Power Station. The Radiological Environmental Program consists of on-site sampling of water and gaseous effluents and off-site monitoring of water, air, river sediments, soils, food pathway samples, and radiation levels in the vicinity of the site. This report discusses the results of this monitoring during 1984. The environmental program outlined in the Beaver Valley Power Station Technical Specifications was followed throughout 1984. The results of this environmental monitoring program show that Shippingport Atomic Power Station and Beaver Valley Power Station operations have not adversely affected the surrounding environment. 23 figs., 18 tabs

  12. Final environmental statement related to the operation of Limerick Generating Station, Units 1 and 2, Docket Nos. 50-352 and 50-353, Philadelphia Electric Company

    International Nuclear Information System (INIS)

    1989-08-01

    In April 1984 the staff of the Nuclear Regulatory Commission issued its Final Environmental Statement (NUREG-0974) related to the operation of Limerick Generating Station, Units 1 and 2, (Docket Nos. 50-352 and 50-353), located on the Schuylkill River, near Pottstown, in Limerick Township, Montgomery and Chester Counties, Pennsylvania. The NRC has prepared this supplement to NUREG-0974 to present its evaluation of the alternative of facility operation with the installation of further severe accident mitigation design features. The NRC staff has discovered no substantial changes in the proposed action as previously evaluated in the Final Environmental Statement that are relevant to environmental concerns nor significant new circumstances or information relevant to environmental concerns and bearing on the licensing of Limerick Generating Station, Units 1 and 2. 15 refs., 10 tabs

  13. Final Environmental Statement related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1989-10-01

    In September 1981, the staff of the Nuclear Regulatory Commission (NRC) issued its Final Environmental Statement (NUREG-0775) related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446), located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. The NRC has prepared this supplement to NUREG-0775 to present its evaluation of the alternative of operating Comanche Peak with the installation of further severe-accident-mitigation design features. The NRC has discovered no substantial changes in the proposed action as previously evaluated in the Final Environmental Statement that are relevant to environmental concerns and bearing on the licensing of Comanche Peak Steam Electric Station, Units 1 and 2. 6 refs., 3 tabs

  14. Aseismic foundation system for nuclear power stations

    International Nuclear Information System (INIS)

    Jolivet, F.; Richli, M.

    1977-01-01

    The aseismic foundation system, as described in this paper, is a new development, which makes it possible to build standard nuclear power stations in areas exposed to strong earthquakes. By adopting proven engineering concepts in design and construction of components, great advantages are achieved in the following areas: safety and reliability; efficiency; design schedule; cost. The need for an aseismic foundation system will arise more and more, as a large part of nuclear power station sites are located in highly seismic zones or must meet high intensity earthquake criteria due to the lack of historic data. (Auth.)

  15. Technical evaluation report on the proposed design modifications and technical-specification changes on grid voltage degradation for the San Onofre Nuclear Genetating Station, Unit 1

    International Nuclear Information System (INIS)

    Selan, J.C.

    1982-01-01

    This report documents the technical evaluation of the proposed design modifications and Technical Specification changes for protection of Class 1E equipment from grid voltage degradation for the San Onofre Nuclear Generating Station, Unit 1. The review criteria are based on several IEEE standards and the Code of Federal Regulations. The evaluation finds that the proposed design modifications and Technical Specification changes will ensure that the Class 1E equipment will be protected from sustained voltage degradation

  16. Safety Evaluation Report, related to the operation of Byron Station, Units 1 and 2 (Docket Nos. STN 50-454 and STN 50-455)

    International Nuclear Information System (INIS)

    1983-11-01

    Supplement No. 3 to the Safety Evaluation Report related to Commonwealth Edison Company's application for licenses to operate the Byron Station, Units 1 and 2, located in Rockvale Township, Ogle County, Illinois, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  17. Safety evaluation report related to the operation of Byron Station, Units 1 and 2. Docket Nos. STN 50-454 and STN 50-455

    International Nuclear Information System (INIS)

    1983-01-01

    Supplement No. 2 to the Safety Evaluation Report related to Commonwealth Edison Company's application for licenses to operate the Byron Station, Units 1 and 2, located in Rockvale Township, Ogle County, Illinois, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  18. Safety Evaluation Report related to the operation of Byron Station, Units 1 and 2 (Docket Nos. STN 50-454 and STN 50-455)

    International Nuclear Information System (INIS)

    1984-05-01

    Supplement No. 4 to the Safety Evaluation Report related to Commonwealth Edison Company's application for licenses to operate the Byron Station, Units 1 and 2, located in Rockvale Township, Ogle County, Illinois, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  19. Flame visualization in power stations

    Energy Technology Data Exchange (ETDEWEB)

    Hulshof, H J.M.; Thus, A W; Verhage, A J.L. [KEMA Fossil Generation, Arnhem (Netherlands)

    1994-01-01

    The study on the title subject is aimed at the determination of the form of the flame and the radiation temperature of the flames of the burners in electric power plants. The adjustment of the burners in a boiler is assessed on the basis of the total performance, in which the NO[sub x]- and CO-concentrations in the flue gases are normative. By comparing the burners mutually, deviating adjustments can be observed, applying optical monitoring techniques. Measurements have been carried out of the coal flames in the unit Gelderland13 of the Dutch energy production company EPON and of the gas flames at the Claus plant A and B of the Dutch energy company EPZ. The final aim of the title study is to draft guidelines, based on the measured flame data, by means of which for every individual burner the adjustment of the fuel supply, the relation with the air supply and the swirl of the combustion air can be optimized

  20. Plant computer system in nuclear power station

    International Nuclear Information System (INIS)

    Kato, Shinji; Fukuchi, Hiroshi

    1991-01-01

    In nuclear power stations, centrally concentrated monitoring system has been adopted, and in central control rooms, large quantity of information and operational equipments concentrate, therefore, those become the important place of communication between plants and operators. Further recently, due to the increase of the unit capacity, the strengthening of safety, the problems of man-machine interface and so on, it has become important to concentrate information, to automate machinery and equipment and to simplify them for improving the operational environment, reliability and so on. On the relation of nuclear power stations and computer system, to which attention has been paid recently as the man-machine interface, the example in Tsuruga Power Station, Japan Atomic Power Co. is shown. No.2 plant in the Tsuruga Power Station is a PWR plant with 1160 MWe output, which is a home built standardized plant, accordingly the computer system adopted here is explained. The fundamental concept of the central control board, the process computer system, the design policy, basic system configuration, reliability and maintenance, CRT display, and the computer system for No.1 BWR 357 MW plant are reported. (K.I.)

  1. Nuclear safeguards control in nuclear power stations

    International Nuclear Information System (INIS)

    Boedege, R.; Braatz, U.; Heger, H.

    1976-01-01

    The execution of the Non-Proliferation Treaty (NPT) has initiated a third phase in the efforts taken to ensure peace by limiting the number of atomic powers. In this phase it is important, above all, to turn into workable systems the conditions imposed upon technology by the different provisions of the Verification Agreement of the NPT. This is achieved mainly by elaborating annexes to the Agreement specifically geared to certain model plants, typical representatives selected for LWR power stations being the plants at Garigliano, Italy (BWR), and Stade, Federal Republic of Germany (PWR). The surveillance measures taken to prevent any diversion of special nuclear material for purposes of nuclear weapons manufacture must be effective in achieving their specific objective and must not impede the circumspect management of operations of the plants concerned. A VDEW working party has studied the technical details of the planned surveillance measures in nuclear power stations in the Federal Republic of Germany and now presents a concept of material balancing by units which meets the conditions imposed by the inspection authority and could also be accepted by the operators of nuclear power stations. The concept provides for uninterrupted control of the material balance areas of the nuclear power stations concerned, allows continuous control of the whole nuclear fuel cycle, is based exclusively on existing methods and facilities, and can be implemented at low cost. (orig.) [de

  2. Evaluation of scenery in power stations

    International Nuclear Information System (INIS)

    Wakatani, Yoshifumi; Yamamoto, Kimio

    1982-01-01

    In the location of power sources hereafter, the location in natural landscape away from urban district tends to increase, accordingly, it is necessary to investigate beforehand the influence to surrounding scenery. However, the method of predicting and evaluating the effect on scenery has not yet been established, therefore, in this study, the basic concept on the investigation, forecast and evaluation of the scenery in power stations was clarified, and the establishment of the work procedure to evaluate the scenery and the effectiveness of the method of forecast and evaluation were examined. Also, the problems when power station facilities exert influence on scenery and the countermeasures to them were considered. Psychological experiment was carried out on the method of evaluation, and the structure and the regulating factors of scenery evaluation were clarified. Recently, good living environment is desired by public, and to the problems of fine environment regarding power stations, more attention is paid. The scenery problems of power stations are the protection of nature and the preservation of good living environment. Since this is an undeveloped field, many problems to be examined still remain. (Kako, I.)

  3. Virginia Power thermal-hydraulics methods

    International Nuclear Information System (INIS)

    Anderson, R.C.; Basehore, K.L.; Harrell, J.R.

    1987-01-01

    Virginia Power's nuclear safety analysis group is responsible for the safety analysis of reload cores for the Surry and North Anna power stations, including the area of core thermal-hydraulics. Postulated accidents are evaluated for potential departure from nucleate boiling violations. In support of these tasks, Virginia Power has employed the COBRA code and the W-3 and WRB-1 DNB correlations. A statistical DNBR methodology has also been developed. The code, correlations and statistical methodology are discussed

  4. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1. Volume 5: Analysis of core damage frequency from seismic events for plant operational state 5 during a refueling outage

    International Nuclear Information System (INIS)

    Budnitz, R.J.; Davis, P.R.; Ravindra, M.K.; Tong, W.H.

    1994-08-01

    In 1989 the US Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two parallel projects, one at Sandia National Laboratories studying a boiling water reactor (Grand Gulf), and the other at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1). Both the Sandia and Brookhaven projects have examined only accidents initiated by internal plant faults---so-called ''internal initiators.'' This project, which has explored the likelihood of seismic-initiated core damage accidents during refueling outage conditions, is complementary to the internal-initiator analyses at Brookhaven and Sandia. This report covers the seismic analysis at Grand Gulf. All of the many systems modeling assumptions, component non-seismic failure rates, and human effort rates that were used in the internal-initiator study at Grand Gulf have been adopted here, so that the results of the study can be as comparable as possible. Both the Sandia study and this study examine only one shutdown plant operating state (POS) at Grand Gulf, namely POS 5 representing cold shutdown during a refueling outage. This analysis has been limited to work analogous to a level-1 seismic PRA, in which estimates have been developed for the core-damage frequency from seismic events during POS 5. The results of the analysis are that the core-damage frequency for earthquake-initiated accidents during refueling outages in POS 5 is found to be quite low in absolute terms, less than 10 -7 /year

  5. Kozloduy nuclear power plant. Units 1-4. Status of safety assessment activities. Rev. 2

    International Nuclear Information System (INIS)

    1999-01-01

    This paper presents the results of the status of safety assessment activities carried out by the Kozloduy Nuclear Power Plant (KNPP) in order to evaluate the current status of the safety of its reactor units 1-4. The steam supply system of this units is based of the reactor WWER-440/ B-230, which is a PWR of Russian design developed according to the safety standards in force in USSR in late 60-s. Now a days 10 reactor units of this type are in operation in four NPPs. Despite of efforts of the different plants to implement safety improvements measures during first 10-15 years of operation of this type of reactor its major safety problems were not eliminated and were a subject of international concern. The systematic evaluation of the deficiencies of the original design of this type of reactors have been initiated by IAEA in the beginning of 1990 and brought to developing a comprehensive list of safety problems which required urgent implementation of safety measures in all plants. To solve this problems in 1991 KNPP initiated implementation of so called 'short term' safety improvement program, developed with the help of WANO under agreement with Bulgarian Nuclear Safety Authority (BNSA) and consortium RISKAUDIT. The program was based on a stage approach and was foreseen to be implemented by tree stages in very tight time schedule in order to achieve significant and rapid improvements of the level of safety in operation of the units. The Short Tenn Program was implemented between the years 1991 and 1997 thanks of the strong safety commitment of NEK and KNPP staff and the broad international cooperation and financial support. Important part of resources were supplied under PHARE program of CEC, EBRD grant agreement and EDF support. The plant current safety level analysis has been performed using IAEA analytical methodology according to 50-SG-O12 standard 'Periodic safety review of operational nuclear power plants'. The approach and criteria for acceptable safety level

  6. 75 FR 44292 - Northern States Power Company; Prairie Island Nuclear Generating Plant, Units 1 and 2; Notice of...

    Science.gov (United States)

    2010-07-28

    ... and DPR-60] Northern States Power Company; Prairie Island Nuclear Generating Plant, Units 1 and 2... assessment, and behavioral observation) of the unescorted access authorization program when making the... under consideration to determine whether it met the criteria established in NRC Management Directive (MD...

  7. 75 FR 75704 - Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of...

    Science.gov (United States)

    2010-12-06

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-275-LR; 50-323-LR] Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of Appointment of Adjudicatory Employee... Seismologist, Office of Nuclear Material Safety and Safeguards, has been appointed as a Commission adjudicatory...

  8. Law on the Decommissioning of unit 1 at the state enterprise of the Republic of Lithuania Ignalina Nuclear Power Plant

    International Nuclear Information System (INIS)

    2000-01-01

    This law regulates the legal principles for the decommissioning of unit 1 at the Ignalina Nuclear Power Plant. The main deadlines for the government in the preparation for the decommissioning are set in the law. All preparatory works should be finished before the year 2005

  9. Lunar base thermoelectric power station study

    Science.gov (United States)

    Determan, William; Frye, Patrick; Mondt, Jack; Fleurial, Jean-Pierre; Johnson, Ken; Stapfer, G.; Brooks, Michael D.; Heshmatpour, Ben

    2006-01-01

    Under NASA's Project Prometheus, the Nuclear Systems Program, the Jet Propulsion Laboratory, Pratt & Whitney Rocketdyne, and Teledyne Energy Systems have teamed with a number of universities, under the Segmented Thermoelectric Multicouple Converter (STMC) program, to develop the next generation of advanced thermoelectric converters for space reactor power systems. Work on the STMC converter assembly has progressed to the point where the lower temperature stage of the segmented multicouple converter assembly is ready for laboratory testing and the upper stage materials have been identified and their properties are being characterized. One aspect of the program involves mission application studies to help define the potential benefits from the use of these STMC technologies for designated NASA missions such as the lunar base power station where kilowatts of power are required to maintain a permanent manned presence on the surface of the moon. A modular 50 kWe thermoelectric power station concept was developed to address a specific set of requirements developed for this mission. Previous lunar lander concepts had proposed the use of lunar regolith as in-situ radiation shielding material for a reactor power station with a one kilometer exclusion zone radius to minimize astronaut radiation dose rate levels. In the present concept, we will examine the benefits and requirements for a hermetically-sealed reactor thermoelectric power station module suspended within a man-made lunar surface cavity. The concept appears to maximize the shielding capabilities of the lunar regolith while minimizing its handling requirements. Both thermal and nuclear radiation levels from operation of the station, at its 100-m exclusion zone radius, were evaluated and found to be acceptable. Site preparation activities are reviewed and well as transport issues for this concept. The goal of the study was to review the entire life cycle of the unit to assess its technical problems and technology

  10. Studying dynamics of indicators of nuclear power stations exploitation (the case of US nuclear power stations)

    OpenAIRE

    Varshavsky, Leonid

    2013-01-01

    Analysis of external and internal factors influencing significant improvement of economic indicators of US nuclear power stations in the 1990s is carried out. Approaches to modeling dynamics of capacity factors of nuclear power stations are proposed. Comparative analysis of dynamics of capacity factors and occupational radiation exposure for various generations of US nuclear power plants is carried out. Dynamical characteristics of «learning by doing» effects for analyzed indicators are measu...

  11. Touchstone for Japan's Export of nuclear power plant system. Vinh Hai unit 1 and 2 project in the Ninh Thuan province in Viet Nam

    International Nuclear Information System (INIS)

    Mitsumata, Hiroki; Takekuro, Ichiro; Kaneko, Kumao; Suzuki, Hideaki; Saito, Shinzo

    2011-01-01

    'Japan-Viet Nam Joint Statement on the Strategic Partnership for Peace and Prosperity in Asia' issued after the meeting between Japan-Viet Nam Prime Ministers on October 31, affirmed that the Vietnamese Government had decided to choose Japan as the cooperation partner for building Vinh Hai Unit 1 and 2 Project in the Ninh Thuan Province, southern Viet Nam, which showed substantially an order of Japan was arranged informally. 'International Nuclear Energy Development of Japan Co., Ltd. (JINED)' set up by industry and government, would negotiate to decide fundamental parameters such as type and power of nuclear power plants with the start of operation scheduled in 2021. This special issue consisted of six articles on significance of the project of Japan's first export, feasibility studies and future perspective and regional effects with introduction of nuclear power station in Viet Nam. (T. Tanaka)

  12. Dosimetry systems in nuclear power stations

    International Nuclear Information System (INIS)

    Weidmann, U.

    1992-01-01

    In the following paper the necessity of the use of electronic dosimetry systems in nuclear power stations is presented, also encompassing the tasks which this type of systems has to fulfill. Based on examples the construction principles and the application possibilities of a PC supported system are described. 5 figs

  13. Process instrumentation for nuclear power station

    International Nuclear Information System (INIS)

    Yanai, Katsuya; Shinohara, Katsuhiko

    1978-01-01

    Nuclear power stations are the large scale compound system composed of many process systems. Accordingly, for the safe and high reliability operation of the plants, it is necessary to grasp the conditions of respective processes exactly and control the operation correctly. For this purpose, the process instrumentation undertakes the important function to monitor the plant operation. Hitachi Ltd. has exerted ceaseless efforts since long before to establish the basic technology for the process instrumentation in nuclear power stations, to develop and improve hardwares of high reliability, and to establish the quality control system. As for the features of the process instrumentation in nuclear power stations, the enormous quantity of measurement, the diversity of measured variables, the remote measurement and monitoring method, and the ensuring of high reliability are enumerated. Also the hardwares must withstand earthquakes, loss of coolant accidents, radiations, leaks and fires. Hitachi Unitrol Sigma Series is the measurement system which is suitable to the general process instrumentation in nuclear power stations, and satisfies sufficiently the basic requirements described above. It has various features as the nuclear energy system, such as high reliability by the use of ICs, the methods of calculation and transmission considering signal linkage, loop controller system and small size. HIACS-1000 Series is the analog controller of high reliability for water control. (Kako, I.)

  14. Water turbine technology for small power stations

    Science.gov (United States)

    Salovaara, T.

    1980-02-01

    The paper examines hydro-power stations and the efficiency and costs of using water turbines to run them. Attention is given to different turbine types emphasizing the use of Kaplan-turbines and runners. Hydraulic characteristics and mechanical properties of low head turbines and small turbines, constructed of fully fabricated steel plate structures, are presented.

  15. Protection and safety of nuclear power stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The extreme requirements for the safety of nuclear power stations set tasks to the civil engineer which, resulting from dynamic load assumptions, among other things also demand the development of novel special concrete steels with a high elastic limit (here: DYWIDAG thread tie rod) for singly reinforced members. (orig.) [de

  16. Impact studies and nuclear power stations

    International Nuclear Information System (INIS)

    Chambolle, Thierry

    1981-01-01

    Impact studies form an essential part of environmental protection. The impact study discipline has enabled the EDF to have a better understanding of the effects of nuclear power stations on the environment and to remedy them at the project design stage [fr

  17. Reliability models for Space Station power system

    Science.gov (United States)

    Singh, C.; Patton, A. D.; Kim, Y.; Wagner, H.

    1987-01-01

    This paper presents a methodology for the reliability evaluation of Space Station power system. The two options considered are the photovoltaic system and the solar dynamic system. Reliability models for both of these options are described along with the methodology for calculating the reliability indices.

  18. Reducing nitrogen oxides from power stations

    International Nuclear Information System (INIS)

    Scheller, W.

    1986-12-01

    The report contains 17 individual lectures of the seminar included in databanks. The lectures concern combustion and waste gas measures for reducing the sulfur dioxide and nitrogen oxide emission from coal-fired and gas-fired power stations. (PW) [de

  19. 75 FR 8753 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental...

    Science.gov (United States)

    2010-02-25

    ... Dusenbury of the North Carolina Department of Environment and Natural Resources regarding the environmental... & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental Assessment and Finding of No... identification of licensing and regulatory actions requiring environmental assessments,'' the NRC prepared an...

  20. Kozloduy nuclear power plant. Units 1-4. Status of safety improvements. Rev. 2

    International Nuclear Information System (INIS)

    1999-01-01

    operation of the units. The plant current safety level analysis has been performed using IAEA analytical methodology according to 50-SG-O12 standard 'Periodic safety review of operational nuclear power plants'. The approach and criteria for acceptable safety level definition, developed by IAEA and presented in INSAG-8 ' was used for analysis performance. Based on this analysis a set of activities was developed, to ensures further plant operation with the necessary safety level. The measures were combined in a program called Complex program for modernization of units 1-4. The implementation of the program is foreseen for a period of four next fuel cycles and started at the beginning of 1998. In respond to the requirements for the content of this paper a detailed description of the current status of resolving of the safety issues, classified by IAEA in TECDOC 640 is presented. The whole process of safety evaluation, short and long term safety improvements presents in a systematical manner the efforts of the Government of Bulgaria, NEK Ltd and KNPP to operate these units with due respect of their nuclear safety responsibility according to Nuclear Safety Convention signed at Vienna in 1994 and ratified by Bulgarian Parliament in 1995

  1. Final environmental statement related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2: (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1981-09-01

    The proposed action is the issuance of operating licenses to the Texas Utilities Generating Company for the startup and operation of Units 1 and 2 of the Comanche Peak Steam Electric Station located on Squaw Creek Reservoir in Somervell County, Texas, about 7 km north-northeast of Glen Rose, Texas, and about 65 km southwest of Fort Worth in north-central Texas. The information in this environmental statement represents the second assessment of the environmental impact associated with the Comanche Peak Steam Electric Station pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51 of the Commission's Regulations. After receiving an application to construct this station, the staff carried out a review of impact that would occur during its construction and operation. This evaluation was issued as a Final Environmental Statement -- Construction Phase. After this environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and public hearings in Glen Rose, Texas, the US Atomic Energy Commission (now US Nuclear Regulatory Commission) issued construction permits for the construction of Units 1 and 2 of the Comanche Peak Steam Electric Station. 16 figs., 34 tabs

  2. Toluene stability Space Station Rankine power system

    Science.gov (United States)

    Havens, V. N.; Ragaller, D. R.; Sibert, L.; Miller, D.

    1987-01-01

    A dynamic test loop is designed to evaluate the thermal stability of an organic Rankine cycle working fluid, toluene, for potential application to the Space Station power conversion unit. Samples of the noncondensible gases and the liquid toluene were taken periodically during the 3410 hour test at 750 F peak temperature. The results obtained from the toluene stability loop verify that toluene degradation will not lead to a loss of performance over the 30-year Space Station mission life requirement. The identity of the degradation products and the low rates of formation were as expected from toluene capsule test data.

  3. Measurement uncertainty recapture (MUR) power uprates operation at Kuosheng Nuclear Power Station

    International Nuclear Information System (INIS)

    Chang Chinjang; Wang Tunglu; Lin Chihpao

    2009-01-01

    Measurement Uncertainty Recapture PowerUprates (MUR PU) are achieved through the use of state-of-the-art feedwater flow measurement devices, i.e., ultrasonic flow meters (UFMs), that reduce the degree of uncertainty associated with feedwater flow measurement and in turn provide for a more accurate calculation of thermal power. The Institute of Nuclear Energy Research (INER) teamed with Sargent and Lundy, LLC (S and L), Pacific Engineers and Constructors, Ltd (PECL), and AREVA to develop a program and plan for the Kuosheng Nuclear Power Station (KNPS) MUR PU Engineering Service Project and for the assistance to Kuosheng MUR PU operation. After regulator's approval of the licensing requests, KSNPS conducted the power ascension test and switchover to the new rated thermal power for Unit 2 and Unit 1 on 7/7/2007 and 11/30/2007, respectively. From then on, KNPS became the first nuclear power plant implementing MUR PU operation in Taiwan and in Asia. (author)

  4. Preparation for decommissioning of the Kozloduy Nuclear Power Plant units 1 and 2

    International Nuclear Information System (INIS)

    Delcheva, T.; Ribarski, V.; Demireva, E.

    2006-01-01

    The first decommissioning strategy of units 1 and 2 of Kozloduy NPP (KNPP) stipulated 3 phases: a 5 year phase including the post operation activities and preparation of the safe enclosure (SE); a 35 years SE period, followed by deferred dismantling. 'Updated Decommissioning Strategy for Units 1-4 of Kozloduy NPP' was issued in June 2006. The Updated Strategy is based on the so called 'Continuous Dismantling' Concept. The updated Strategy starts preparatory work earlier and then moves into dismantling work without a significant gap. The aim is to achieve a more optimal distribution of the dismantling activities along the time, saving jobs and the existing knowledge of the plant personnel during the decommissioning, and ensuring smooth and more effective use of financial and human resources and of the available infrastructure for waste treatment. This paper gives general information about the updated strategy and activities required for its implementation. (author)

  5. Final environmental statement related to the proposed construction of Douglas Point Nuclear Generating Station, Units 1 and 2: (Docket Nos. 50-448 and 50-449)

    International Nuclear Information System (INIS)

    1976-03-01

    The proposed action is the issuance of construction permits to the Potomac Electric Power Company for the construction of the Douglas Point Nuclear Generating Station, Units 1 and 2, located in Charles County, Maryland. The exhaust steam will be cooled via a closed-cycle mode incorporating natural-draft wet cooling towers. The water used in the cooling system will be obtained from the Potomac River. Construction-related activities on the site will convert about 290 acres of the 1390 acres of forested land at the Douglas Point site to industrial use. In addition to acreage at the site, approximately 4.5 miles of transmission corridor will require about 211 acres of land for rights-of-way. This corridor will connect with 27 miles of existing rights-of-way over which a line connecting Possum Point to Burches Hill has already been approved. The installation of new transmission line, uniquely identified with Douglas Point, along the existing right-of-way will involve approximately 464 additional acres. As described in the application, the maximum river water intake will be about 97,200 gpm. Of this, a maximum of about 28,000 gpm will be lost in drift or evaporation from the cooling towers. About 700 gpm maximum of fresh well water will be consumed. It is conservatively assumed that all aquatic organisms entrained in the service water system will be killed due to thermal and mechanical shock. It is further estimated that at 97,200 gpm maximum total river water intake, the maximum impact on the striped bass fishery will be a reduction of <5%. The risk associated with accidental radiation exposure is very low. 32 figs., 59 tabs

  6. A study on the optimal replacement periods of digital control computer's components of Wolsung nuclear power plant unit 1

    International Nuclear Information System (INIS)

    Mok, Jin Il; Seong, Poong Hyun

    1993-01-01

    Due to the failure of the instrument and control devices of nuclear power plants caused by aging, nuclear power plants occasionally trip. Even a trip of a single nuclear power plant (NPP) causes an extravagant economical loss and deteriorates public acceptance of nuclear power plants. Therefore, the replacement of the instrument and control devices with proper consideration of the aging effect is necessary in order to prevent the inadvertent trip. In this paper we investigated the optimal replacement periods of the control computer's components of Wolsung nuclear power plant Unit 1. We first derived mathematical models of optimal replacement periods to the digital control computer's components of Wolsung NPP Unit 1 and calculated the optimal replacement periods analytically. We compared the periods with the replacement periods currently used at Wolsung NPP Unit 1. The periods used at Wolsung is not based on mathematical analysis, but on empirical knowledge. As a consequence, the optimal replacement periods analytically obtained and those used in the field show a little difference. (Author)

  7. Retrofit of new digital control systems in existing power stations

    International Nuclear Information System (INIS)

    Smith, J.E.; Baird, C.F.

    1986-01-01

    With the notable exception of the Canadian CANDU nuclear power stations, little use has been made of digital control in North American nuclear stations. Recently, however, there has been renewed interest in such systems within the nuclear industry in response to demands for better ergonomics in control room design and the obsolescence of control equipment whose fundamental design has changed little in 20 yr. Early in 1985, Atomic Energy of Canada Limited was asked by New Brunswick Power to advise on the redesign of the control systems for two fossil-fired generating stations, Coleson Cove and Courtenay Bay Unit 4. Coleson Cove is to be converted from oil to coal firing with consequent extensive control system changes and Courtenay Bay Unit 4 required a low-cost solution to the problem of relocating its control room from the existing isolated location to the combined control center used by units 1, 2, and 3. In both cases, the recommended solution involves the retrofit of state-of-the-art digital control systems. Although the units involved are nonnuclear the experience is applicable

  8. Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530): Final environmental statement

    International Nuclear Information System (INIS)

    1982-02-01

    The proposed action is the issuance of operating licenses to the Arizona Public Service Company (APS, applicant) for the startup and operation of PVNGS, Units 1, 2, and 3, located in Maricopa County, about 24 km (15 mi) west of Buckeye, Arizona. The information in this statement represents the second assessment of the environmental impact associated with PVNGS Units 1, 2, and 3 pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations (10 CFR) Part 51 of the Commissions's Regulations. After receiving an application in July 1974 to construct this station, the staff carried out a review of impacts that would occur during its construction and operation. That evaluation was issued as a Final Environmental Statement/emdash/Construction Phase (FES-CP). After this environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and public hearings in Phoenix, Arizona, the US Nuclear Regulatory Commission issued Construction Permits Nos. CPPR-141, CPPR-142, and CPPR-143 for the construction of PVNGS Units 1, 2, and 3. As of September 1981, the construction of Unit 1 was about 92 percent complete, Unit 2 was 68 percent complete, and Unit 3 was 26 percent complete. 11 figs., 21 tabs

  9. 78 FR 41425 - In the Matter of Duke Energy Carolinas, LLC; (Oconee Nuclear Station, Units 1, 2, and 3...

    Science.gov (United States)

    2013-07-10

    ... approved plant procedures and the completion of operator training necessary to accomplish this lineup, and a combination of testing and engineering evaluation in accordance with station procedures which... credited. This modification along with approved plant procedures and the completion of operator training...

  10. Technical specifications, Catawba Nuclear Station, Unit 1 (Docket No. 50-413). Appendix A to License No. NPF-35

    International Nuclear Information System (INIS)

    1985-01-01

    Information is presented concerning safety limits for operation of reactor control systems, power distribution, instrumentation, reactor coolant system, emergency core cooling system, containment system, electrical power systems, refueling operations, radioactive effluents, environmental monitoring, reactor site, and administrative aspects

  11. MSR redesign and reconstruction at Indiana Michigan Power Company's Donald C. Cook Nuclear Power Plant, Unit 1

    International Nuclear Information System (INIS)

    Yarden, A.L.; Tam, C.W.; Benes, J.D.; Arnold, W.E.

    1993-01-01

    When Indiana Michigan Power Company's (I and M) 1089- MWe, PWR, Donald C. Cook Nuclear Plant, Unit 1, (Cook 1) in Bridgeman, Michigan went into commercial operation in late 1975, its turbine generator included two Moisture Separator Reheater (MSR) vessels. Each of these original MSRs contained, in addition to the moisture separation section, a single stage 2-pass reheater consisting of 5/8 inch O.D., finned CuNi tubes with main heating steam as an energy source. The enormous size of the tube bank, with a vertical orientation of its tubes' U-bends, led the designer to choose two separate headers for the inlet side and outlet side of the tube bank. Over the years, these 2-pass reheaters had deteriorated mechanically such that maintenance costs had increased considerably. Also, the MSR performance in terms of MWe gain, had fallen off as a result of a gradual reduction of both superheat and moisture separation efficiency. In 1990, these MSRs were totally reconstructed with inherently different 4-pass reheaters and upgraded moisture separation systems. The performance and other direct parameters of these newly retrofitted and improved MSRs have exceeded original design specifications, and their operational stability has improved markedly. This MSR reconstruction at Cook 1 is the first of its kind to include a 4-pass reheater in association with a nuclear turbine generator of this design. This paper highlights the problems and solutions associated respectively with the original reheaters in the Cook 1 MSRs and their recent redesign, reconstruction, and performance

  12. Practical design considerations for photovoltaic power station

    Science.gov (United States)

    Swanson, T. D.

    Aspects of photovoltaic (PV) technology are discussed along with generic PV design considerations, taking into account the resource sunlight, PV modules and their reliability, questions of PV system design, the support structure subsystem, and a power conditioning unit subsystem. A description is presented of two recent projects which demonstrate the translation of an idea into actual working PV systems. A privately financed project in Denton, Maryland, went on line in early December, 1982, and began providing power to the local utility grid. It represents the first intermediate size, grid-connected, privately financed power station in the U.S. Based on firm quotes, the actual cost of this system is about $13/W peak. The other project, called the PV Breeder, is an energy independent facility which utilizes solar power to make new solar cells. It is also the first large industrial structure completely powered by the sun.

  13. System and Software Design for the Plant Protection System for Shin-Hanul Nuclear Power Plant Units 1 and 2

    International Nuclear Information System (INIS)

    Hwang, In Seok; Kim, Young Geul; Choi, Woong Seock; Sohn, Se Do

    2015-01-01

    The Reactor Protection System(RPS) protects the core fuel design limits and reactor coolant system pressure boundary for Anticipated Operational Occurrences (AOOs), and provides assistance in mitigating the consequences of Postulated Accidents (PAs). The ESFAS sends the initiation signals to Engineered Safety Feature - Component Control System (ESF-CCS) to mitigate consequences of design basis events. The Common Q platform Programmable Logic Controller (PLC) was used for Shin-Wolsung Nuclear Power Plant Units 1 and 2 and Shin-Kori Nuclear Power Plant Units 1, 2, 3 and 4 since Digital Plant Protection System (DPPS) based on Common Q PLC was applied for Ulchin Nuclear Power Plant Units 5 and 6. The PPS for Shin-Hanul Nuclear Power Plant Units 1 and 2 (SHN 1 and 2) was developed using POSAFE-Q PLC for the first time for the PPS. The SHN1 and 2 PPS was delivered to the sites after completion of Man Machine Interface System Integrated System Test (MMIS-IST). The SHN1 and 2 PPS was developed to have the redundancy in each channel and to use the benefits of POSAFE-Q PLC, such as diagnostic and data communication. The PPS application software was developed using ISODE to minimize development time and human errors, and to improve software quality, productivity, and reusability

  14. System and Software Design for the Plant Protection System for Shin-Hanul Nuclear Power Plant Units 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, In Seok; Kim, Young Geul; Choi, Woong Seock; Sohn, Se Do [KEPCO EnC, Daejeon (Korea, Republic of)

    2015-10-15

    The Reactor Protection System(RPS) protects the core fuel design limits and reactor coolant system pressure boundary for Anticipated Operational Occurrences (AOOs), and provides assistance in mitigating the consequences of Postulated Accidents (PAs). The ESFAS sends the initiation signals to Engineered Safety Feature - Component Control System (ESF-CCS) to mitigate consequences of design basis events. The Common Q platform Programmable Logic Controller (PLC) was used for Shin-Wolsung Nuclear Power Plant Units 1 and 2 and Shin-Kori Nuclear Power Plant Units 1, 2, 3 and 4 since Digital Plant Protection System (DPPS) based on Common Q PLC was applied for Ulchin Nuclear Power Plant Units 5 and 6. The PPS for Shin-Hanul Nuclear Power Plant Units 1 and 2 (SHN 1 and 2) was developed using POSAFE-Q PLC for the first time for the PPS. The SHN1 and 2 PPS was delivered to the sites after completion of Man Machine Interface System Integrated System Test (MMIS-IST). The SHN1 and 2 PPS was developed to have the redundancy in each channel and to use the benefits of POSAFE-Q PLC, such as diagnostic and data communication. The PPS application software was developed using ISODE to minimize development time and human errors, and to improve software quality, productivity, and reusability.

  15. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement 3

    International Nuclear Information System (INIS)

    1984-10-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the applicant) for licenses to operate the Limerick Generating Station, Units 1 and 2. Supplement 1 was issued in December 1983 and addressed several outstanding issues. Supplement 1 also contains the comments made by the Advisory Committee on Reactor Safeguards in its report dated October 18, 1983. Supplement 2 was issued in October 1984 and addressed fourteen outstanding and fifty-three confirmatory issues and closed them put. This Supplement 3 addresses the remaining issues that require resolution before issuance of the operating license for Unit 1 and closes them out

  16. History of measures taken to reduce radiation exposure at Hamaoka Nuclear Power Station

    International Nuclear Information System (INIS)

    Kondou, Masashi; Takagi, Nobuyuki; Yabushita, Kazuo; Dekijima, Makoto

    2009-01-01

    Hamaoka Nuclear Power Station currently has five reactors, Units 1 to 5. Units 1 and 2 halted commercial operation in January 2009 and are now being prepared for decommissioning. Units 3 to 5 are operating at the rated thermal output with the gross electrical output of 3504 MWe. Hamaoka Nuclear Power Station has been operating for about 30 years since Unit 1 started up in 1976. Various measures have been taken to control water chemistry: for controlling SCC in the core internals and structural materials, hydrogen injection and noble metal injection were implemented; and to reduce radiation exposure for workers, condensate filter demineralizers were added, hollow fiber filters and pleated filters were installed in the condensate cleanup system, and zinc injection was performed. This paper describes measures taken at Hamaoka to reduce exposure in terms of water chemistry and techniques to monitor ion impurities in the reactor water. (author)

  17. Operating experience at Scottish Nuclear's power stations

    International Nuclear Information System (INIS)

    Blackburn, P.

    1991-01-01

    A brief history is presented of the design and operation of the four Scottish nuclear power stations currently run by Scottish Nuclear, namely Hunterston 'A' and 'B' and the Torness reactors. A design flaw in the Magnox reactor at Hunterston 'A' led to it being operated at lower than optimal temperature and hence producing less power. For Hunterston 'B' reactor the Advanced Gas Cooled design prototype was used. Operating setbacks and successes are noted. The design chosen for Torness embraced all the good points of Hunterston 'B' but sought to eliminate its faults. After 26 years of successful operation Hunterston 'A' is now being decommissioned, while the other three stations continue to generate electricity successfully. (UK)

  18. Safety planning for nuclear power stations

    International Nuclear Information System (INIS)

    Tadmor, J.

    1979-01-01

    The article shows that compared to the many industries and other human activities, nuclear power stations are among the safest. A short description of the measures taken to prevent accidents and of the additional safety means entering into action if an accident does occur is presented. It is shown that in nuclear plants the death frequency following malfunctioning is 1 death in 100.000 years whereas deaths following other human activities is 1 in 2 to 100 years and following natural calamities like earthquakes and floods is 1 in 10 years. As an example it is shown that for a population of 15.000.000 living in a radius of 40 km around 100 power stations the average number of deaths will be of 2 per year as compared to 4200 from road accidents with the corresponding number of injuries of 20 and 375.000 respectively. (B.G.)

  19. Dynamics and control in nuclear power stations

    International Nuclear Information System (INIS)

    Butterfield, M.H.

    1992-01-01

    This volume presents a wide view of aspects of control of nuclear power stations by taking into consideration the plant as a whole and the protection systems employed therein. Authors with worldwide experience consider all aspects of dynamics and control in the context of both fast and thermal power stations. The topics discussed include the methods of development and applications within the analysis of plant behaviour, the validation of mathematical models, plant testing, and the design and implementation of controls. There are 27 papers all of which are indexed separately; steady states and model evolution (5 papers), control and protection systems (5 papers), transients (7 papers), testing and data (3 papers), model validation (6 papers) and commissioning and operation (1 paper). (author)

  20. The decommissioning of nuclear power stations

    International Nuclear Information System (INIS)

    Barker, F.

    1992-01-01

    This report has been commissioned by the National Steering Committee of Nuclear Free Local Authorities to provide: a comprehensive introduction to the technical, social, political, environmental and economic dimensions to nuclear power station decommissioning; an independent analysis of Nuclear Electric's recent change of decommissioning strategy; the case for wider public involvement in decision making about decommissioning; and a preliminary assessment of the potential mechanisms for achieving that essential wider public involvement

  1. Technological development of Guangdong nuclear power station

    International Nuclear Information System (INIS)

    Huang Shiqiang

    2000-01-01

    After over 5 years of operations, the Guangdong Nuclear Power Station (GNPS) has achieved good results both economically and in operational safety performance. The main attributes to the success of the plant operational performances include the equipment reliability, the technical capability and management efficiency. To that the key strategy has been to adopt know-how and technological transfer and encourage self-innovation, aiming to strive for the long-term self-reliance in design, manufacturing and operating the plant. (author)

  2. Requirement profile for nuclear power station personnel

    International Nuclear Information System (INIS)

    Roeglin, H.C.

    1984-01-01

    The starting point in deriving the requirement profile for the shift personnel in the control rooms of nuclear power stations is information of a technical, organisational and ergonomic kind. The technique used, the distribution of work to different work areas and the configuration of the workplace is determined by the tasks and the environmental conditions in which they have to be done. (orig./DG) [de

  3. Front against the Temelin nuclear power station

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Though the main concern of the author is the Czechoslovakian Temelin power station, the main target of his attacks are the Austrian proponents of nuclear energy i.e. the Reactor Safty Commission and the Austrian Chancellor. The newly opened possibility of anti-nuclear propaganda in the CSFR, by Greenpeace and the author's organisation is welcomed. The number of signatures collected against Temelin is given as 350.000. 815 signatures come from Japan: a facsimile of some Japanese signatures is presented

  4. Thermodynamic power stations at low temperatures

    Science.gov (United States)

    Malherbe, J.; Ployart, R.; Alleau, T.; Bandelier, P.; Lauro, F.

    The development of low-temperature thermodynamic power stations using solar energy is considered, with special attention given to the choice of the thermodynamic cycle (Rankine), working fluids (frigorific halogen compounds), and heat exchangers. Thermomechanical conversion machines, such as ac motors and rotating volumetric motors are discussed. A system is recommended for the use of solar energy for irrigation and pumping in remote areas. Other applications include the production of cold of fresh water from brackish waters, and energy recovery from hot springs.

  5. Efficiency of a small wind power station

    International Nuclear Information System (INIS)

    Ivanov, K.; Christov, Ch.; Kozarev, N.

    2001-01-01

    The aim of the study is to obtain the optimal solution for wind station both by technical parameters and costs. The energetic characteristics of the wind as a renewable energy source are discussed and assessment of the economical efficiency is made. For the determination of the optimal wind parameters the method of integral wind curves is used. The low power wind generators (0.4 - 1.5 kW) are considered as optimal for the presented wind characteristics

  6. The experience in the Cernavoda Unit 1 operation - a stimulating argument for future nuclear power development in Romania

    International Nuclear Information System (INIS)

    Rotaru, I.; Bucur, I.; Galeriu, A.C.; Budan, O.

    1999-01-01

    The Romanian nuclear program has been developed based on the option for CANDU type reactors. At the beginning, this program was unrealistically conceived and its management was inappropriate. The program was reconsidered in 1990 and the management policy and organization structure were also adapted accordingly. The paper presents, in the first part, the actual organization structure, adapted for the execution of the current and future activities, related to the nuclear power program. The performance achieved by Cernavoda Unit 1 constitutes the main part of the paper. The performances described demonstrate that the Cernavoda Unit 1 is a success and the Romania's electricity needs are satisfied in a proportion of about 12% by the nuclear power. The paper also presents a general view on Cernavoda Unit 2 perspectives. The essential conclusion of the paper is that the continuation of the nuclear program appears to be a logical option, generally accepted in Romania, limited only by financial restraints. (author)

  7. Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Docket Nos. STN 50-528, STN 50-529 and STN 50-530): Final environmental statement

    International Nuclear Information System (INIS)

    1975-09-01

    The proposed action is the issuance of construction permits to the Arizona public Service Company for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Preparation of the 3800-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will be prominently devoted to station facilities. An additional 1200- to 1300-acre evaporation pond will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use. Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation in local ephemeral water courses. Stringent measures will be taken to minimize these effects. The total radiation dose to construction workers is estimated to be 15 man-rem. This dose is a small fraction of the approximately 470 man-rem which will be received by the construction force over the same period from natural background radiation. Station, transmission line, and water pipeline construction will kill, remove, displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important permanent impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects as do result form the proposed action

  8. Community reaction to noise from power stations

    International Nuclear Information System (INIS)

    Job, R.F.S.; Hede, A.J.

    1989-01-01

    Community reaction is a major consideration in noise control. The relationship between noise exposure and community reaction has received considerable attention in relation to railway, traffic, aircraft and impulsive noise. The results have shown a number of features in common, including: similarly shaped noise/reaction functions; similar results across different measurement techniques and cultures, noise/reaction correlations based on individual respondent data are low (mean r = 0.42 ± 0.12: Job, 1988), although correlations of .58 and above have been reported correlations based on data grouped by noise exposure are generally high and relatively unaffected by the type of noise studied whereas correlations based on individual data tend to be lower for impulsive noise than for transportation noise attitude to the noise source and sensitivity to noise shows strong correlations with reaction. This paper reports that the present study was undertaken in order toe establish over a wider range of noise exposure whether community reaction to power station noise is similar to reaction to other types of non-impulsive noise. It is possible that reaction is different given important differences in the source of the noise which may affect attitude. Attitudes towards power stations may be more positive than attitudes to aircraft or rail noise for example, because almost all respondents use electricity regularly every day. Further, the power stations in the present study provided employment for the relatively small surrounding communities

  9. Safety Evaluation Report related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457)

    International Nuclear Information System (INIS)

    1987-05-01

    In November 1983, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1002) regarding the application filed by the Commonwealth Edison Company, as applicant and owner, for a license to operate Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457). The first supplement to NUREG-1002 was issued in September 1986; the second supplement to NUREG-1002 was issued in October 1986. This third supplement to NUREG-1002 reports the status of certain items that remained unresolved at the time Supplement 2 was published. The facility is located in Reed Township, Will County, Illinois

  10. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352-50-353). Supplement 1

    International Nuclear Information System (INIS)

    1983-12-01

    This report supplements the Safety Evaluation Report (NUREG-0991, August 1983) for the application filed by the Philadelphia Electric Company, as applicant and owner, for licenses to operate the Limerick Generating Station Units 1 and 2 (Docket Nos. 50-352 and 50-353). The facility is located near Pottstown, Pennsylvania. Subject to favorable resolution of the items discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  11. Safety Evaluation Report related to the operation of Byron Station, Units 1 and 2 (Dockets Nos. STN 50-454 and STN 50-455)

    International Nuclear Information System (INIS)

    1984-10-01

    Supplement No. 5 to the Safety Evaluation Report related to Commonwealth Edison Company's application for licenses to operate the Byron Station, Units 1 and 2, located in Rockvale Township, Ogle County, Illinois, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report. Because of the favorable resolution of the items discussed in this report, the staff concludes that there is reasonable assurance that the facility can be operated by the applicant without endangering the health and safety of the public

  12. Safety evaluation report related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457)

    International Nuclear Information System (INIS)

    1983-11-01

    The Safety Evaluation Report for the application filed by the Commonwealth Edison Company, as applicant and owner, for a license to operate Braidwood Station, Units 1 and 2 (Docket Nos. STN 50-456 and STN 50-457), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Reed Township, Will County, Illinois. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  13. Safety Evaluation Report related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457). Supplement No. 2

    International Nuclear Information System (INIS)

    1986-10-01

    In November 1983, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1002) regarding the application filed by the Commonwealth Edison Company, as applicant and owner, for a license to operate Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457). The first supplement to NUREG-1002 was issued in September 1986. This second supplement to NUREG-1002 reports the status of certain items that remained unresolved at the time Supplement 1 was published. The facility is located in Reed Township, Will County, Illinois

  14. Safety-evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353)

    International Nuclear Information System (INIS)

    1983-08-01

    The Safety Evaluation Report for the application filed by the Philadelphia Electric Company, as applicant and owner, for licenses to operate the Limerick Generating Station Units 1 and 2 (Docket Nos. 50-352 and 50-353), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located near Pottstown, Pennsylvania. Subject to favorable resolution of the items discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  15. Safety Evaluation Report related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457). Supplement No. 1

    International Nuclear Information System (INIS)

    1986-09-01

    In November 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1002) regarding the application filed by the Commonwealth Edison Company, as applicant and owner, for a license to operate Braidwood Station, Units 1 and 2 (Docket Nos. STN 50-456 and STN 50-457). The facility is located in Reed Township, Will County, Illinois. This first supplement to NUREG-1002 reports the status of certain items that remained unresolved at the time the Safety Evaluation Report was published

  16. NRC Fact-Finding Task Force report on the ATWS event at Salem Nuclear Generating Station, Unit 1, on February 25, 1983

    International Nuclear Information System (INIS)

    1983-03-01

    An NRC Region I Task Force was established on March 1, 1983 to conduct fact finding and data collection with regard to the circumstances which led to an anticipated transient without scram (ATWS) event at the Public Service Electric and Gas Company's Salem Generating Station, Unit 1 on February 25, 1983. The charter of the Task Force was to determine the factual information pertinent to management and administrative controls which should have ensured proper operation of the reactor trip breakers in the solid state protection system. This report documents the findings of the Task Force along with its conclusions

  17. Optimal replacement and inspection periods of safety and control boards in Wolsung nuclear power plant unit 1

    International Nuclear Information System (INIS)

    Mok, Jin Il

    1993-02-01

    In nuclear power plants, the safety and control systems are important for operating and maintaining safety of nuclear power plants. Due to the failure of the instrument and control devices of nuclear power plants caused by aging, nuclear power plants occasionally trip. Since the start of first commercial operation of Kori nuclear power plant (NPP) unit 1, the trips caused by instrument and control systems account for 28% of total trips of NPPs in Korea. Even a single trip of a nuclear power plant causes an extravagant economical loss and deteriorates public acceptance of nuclear power plants. Therefore, the replacement of the instrument and control devices with proper consideration of the aging effect is necessary in order to prevent the inadvertent trip. In this work we investigated the optimal replacement periods of the digital control computer's (DCC) and the programmable digital comparator's (PDC) electronic circuit boards of Wolsung nuclear power plant Unit 1. We first derived mathematical models which calculate optimal replacement periods for electronic circuit boards of digital control computer (DCC) and for those of the programmable digital comparator (PDC) in Wolsung NPP unit 1. And we analytically obtained the optimal replacement periods of electronic circuit boards by using these models. We compared these periods with the replacement periods currently used at Wolsung NPP Unit. The periods used at Wolsung is not based on mathematical analysis, but on empirical knowledge. As a consequence, the optimal replacement periods analytically obtained for the electronic circuit boards of DCC and those used in the field shown small difference : the optimal replacement periods analytically obtained for the electronic circuit boards of PDC are shorter than those used in the field in general. The engineered safeguards of Wolsung nuclear power plant unit 1 contains redundant systems of 2-out-of-3 logic which are not operating under normal conditions but they are called

  18. Iron turbidity removal from the active process water system of the Kaiga Generating Station Unit 1 using an electrochemical filter

    International Nuclear Information System (INIS)

    Venkateswaran, G.; Gokhale, B.K.

    2007-01-01

    Iron turbidity is observed in the intermediate cooling circuit of the active process water system (APWS) of Kaiga Generating Station (KGS). Deposition of hydrous/hydrated oxides of iron on the plate type heat exchanger, which is employed to transfer heat from the APWS to the active process cooling water system (APCWS), can in turn result in higher moderator D 2 O temperatures due to reduced heat transfer. Characterization of turbidity showed that the major component is γ-FeOOH. An in-house designed and fabricated electrochemical filter (ECF) containing an alternate array of 33 pairs of cathode and anode graphite felts was successfully tested for the removal of iron turbidity from the APWS of Kaiga Generating Station Unit No. 1 (KGS No. 1). A total volume of 52.5 m 3 water was processed using the filter. At an average inlet turbidity of 5.6 nephelometric turbidity units (NTU), the outlet turbidity observed from the ECF was 1.6 NTU. A maximum flow rate (10 L . min -1 ) and applied potential of 18.0-20.0 V was found to yield an average turbidity-removal efficiency of ∝ 75 %. When the experiment was terminated, a throughput of > 2.08 . 10 5 NTU-liters was realized without any reduction in the removal efficiency. Removal of the internals of the filter showed that only the bottom 11 pairs of felts had brownish deposits, while the remaining felts looked clean and unused. (orig.)

  19. Circulating water pumps for nuclear power stations

    International Nuclear Information System (INIS)

    Satoh, Hiroshi; Ohmori, Tsuneaki

    1979-01-01

    Shortly, the nuclear power station with unit power output of 1100 MW will begin the operation, and the circulating water pumps manufactured recently are those of 2.4 to 4 m bore, 840 to 2170 m 3 /min discharge and 2100 to 5100 kW driving power. The circulating water pumps are one of important auxiliary machines, because if they fail, power generation capacity lowers immediately. Enormous quantity of cooling water is required to cool condensers, therefore in Japan, sea water is usually used. As siphon is formed in circulating water pipes, the total head of the pumps is not very high. The discharge of the pumps is determined so as to keep the temperature rise of discharged water lower than 7 deg. C. The quantity of cooling water for nuclear power generation is about 50% more as compared with thermal power generation because of the difference in steam conditions. The total head of the pumps is normally from 8 to 15 m. The circulating water pumps rarely stop after they started the operation, therefore it is economical to determine the motor power so that it can withstand 10% overload for a short period, instead of large power. At present, vertical shaft, oblique flow circulating water pumps are usually employed. Recently, movable blade pumps are adopted. The installation, construction and materials of the pumps and the problems are described. (Kako, I.)

  20. Care management at Ikata Power Station

    International Nuclear Information System (INIS)

    Sakai, Koji

    1982-01-01

    For operating nuclear power stations safely and economically, it is necessary to control nuclear fuel itself and reactor cores. Nuclear fuel must be controlled consistently in view of quantitative balance and operational method over the whole nuclear fuel cycle of uranium ore, fabrication, burning in reactors and reprocessing, based on the plan of using fuel in electric power companies. The control of the burning in reactors is called core management, and it is important because the users of fuel execute it. For dealing with such core management works, Shikoku Electric Power Co., Inc., has developed the computer code system for grasping the state of fuel exchange and the burning condition in reactors and used it since 1972. The outline of the core management in Ikata Power Station is reported in this paper centering around computing works. The core management works are divided into those at the time of regular inspection and those in operation. In the regular inspection, fuel inspection, fuel exchange and reactor physics test are performed. In operation, the burning condition of fuel is grasped. The technical computations corresponding to these works are explained, and the examples of computations are shown. (Kako, I.)

  1. Obrigheim nuclear power station. Annual report 1987

    International Nuclear Information System (INIS)

    Koerner, C.

    1988-01-01

    The Obrigheim nuclear power station was operated at full load during the year 1987; 7.351 operating hours procuded electrical energy of 2.607 GWh. This is the fifth best annual result during Obrigheim's operating period. Since commissioning in October 1968, 139.310 hours of operation have generated 46.681 GWh (gross) and from test operation in March 1969 until the end of 1987, 138.530 hours of operation have generated 46.569 GWh. This is an availability of power of 81.6% in this period and a time availability of 83.9%. In 1987, the plant was shut down for 1.222 hours for the 18th refueling including testing, inspection and repair work. Apart from refueling, the plant had a good time availability and therefore contributed 5% to the safe, economical and environmentally acceptable electricity supply of the Land Baden-Wuerttemberg. The power station is of great significance to the region, both in terms of power supply and the economy. (orig./HP) [de

  2. Vacuum switchgear for power station auxiliary switchboards

    International Nuclear Information System (INIS)

    Coombs, P.E.

    1992-01-01

    Sizewell B is the first UK power station in which vacuum switchgear is used for the auxiliary switchboards. Previously the 3.3kV, 6.6kV or 11kV switchgear has used air-break circuit breakers and fused air-break contactors, known as motor starting devices or fused switching devices (FSD). The use of vacuum interrupters is therefore a new technology in this application, although it has been established in the UK distribution network and in industrial installations from the mid 1970s. Vacuum switchgear was already in use in the USA for power station auxiliary switchgear at the time that it was proposed for Sizewell B. The Sizewell B high voltage auxiliary switchgear comprises eight Unit and Station Auxiliary Switchboards at 3.3kV and 11kV, and four 3.3kV Essential Switchboards for the essential safety related circuits, making a total of 65 circuit breakers plus FSD panels. (Author)

  3. Kewaunee Nuclear Power Plant, Unit 1. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical power generated was 3,383,265.0 MWh with the generator on line for 6,926.8 hrs. Information is presented concerning operations, power generation, changes in technical specifications, modifications, steam generator tube inspection, containment leak rate tests, in-service inspection, maintenance, environmental technical specifications, and the radiological monitoring program

  4. Kewaunee Nuclear Power Plant, Unit 1. Semiannual operating report, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 1,700,492 MWh(e) with the reactor on line 3,797.02 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, radiochemistry, health physics, release of radioactive materials, reportable occurrences, design changes, reactor engineering, environmental technical specifications, and bio testing

  5. Oyster Creek Nuclear Power Plant, Unit 1. Annual operating report No. 1: January--December 1976

    International Nuclear Information System (INIS)

    Net electrical power generated was 3,860,347 MWH with the reactor on line 6,967.3 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, reportable occurrences, fuel performance, and leak rate testing

  6. Robert Emmett Ginna Nuclear Power Plant, Unit 1. Annual report No. 12: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical power generated was 2,060,941 MWH with the generator on line 5,115 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, reportable occurrences, steam generator inspections, containment integrated leak tests, and environmental monitoring

  7. Donald C. Cook Nuclear Power Plant, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Net electrical power generated was 4,457,836,000 MWH(e) with the reactor on line 6004.2 hrs. Information is presented concerning power generation, shutdowns, corrective maintenance occupational radiation exposure, release of radioactive materials, changes, and fuel history

  8. Managing nuclear power stations for success

    International Nuclear Information System (INIS)

    Smith, G.

    2006-01-01

    Ontario Power Generation's (OPG) top operational priority is to manage its nuclear assets to ensure they operate as safely, efficiently and cost effectively as possible. In meeting these objectives, the company is focused on continuously improving its nuclear performance and benchmarking that performance against the best in North America. This presentation explores how OPG is improving its nuclear performance and the steps it is taking to sustain performance success going forward. Topics to be discussed include the measures OPG is taking to enhance human performance and station reliability as well as the company's preparations to determine if a business case exists for extending the lives of the Pickering B and eventually the Darlington nuclear stations. (author)

  9. Lifetime management of Magnox power stations

    International Nuclear Information System (INIS)

    Smitton, C.

    1998-01-01

    Magnox Electric, which is, a subsidiary of BNFL, operates six nuclear power plants that have an average age of about 33 years. The procedures developed to maintain the plants and ensure nuclear safety in longer-term operation are reviewed. The technical limit on station lifetimes is expected to be determined by the effect of ageing on major reactor structures where replacement is impractical. Examination of the effect of ageing confirms that the stations are capable of operating to a life of at least 40 years. The economic factors affecting operation are reviewed, recognising the need to sell electricity in a competitive market. Recently Magnox Electric and BNFL have merged and all plant supporting Magnox operations are now within a single integrated company that will provide further opportunities for improved efficiency. (author)

  10. Dealing with operational power station wastes

    Energy Technology Data Exchange (ETDEWEB)

    Pepper, R B [Central Electricity Generating Board, London (UK). Nuclear Health and Safety Dept.

    1981-08-01

    The disposal of wastes from nuclear power stations is discussed. Liquid and gaseous wastes, from magnox stations, which are of low level activity, are dispersed to the sea or estuaries on coastal sites or for the case of Trawfynyeld, to the nearby lake. Low activity solid wastes are either disposed of on local authority tips or in shallow land burial sites. Intermediate level wastes, consisting mainly of wet materials such as filter sludges and resins from cooling ponds, are at present stored in shielded storage tanks either dry or under water. Only one disposal route for intermediate waste is used by Britain, namely, sea-dumping. Materials for sea dumping have to be encapsulated in a durable material for example, concrete.

  11. Draft environmental statement related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. STN 50-456 and STN 50-457)

    International Nuclear Information System (INIS)

    1983-12-01

    The Draft Environment Statement contains the second assessment of the environmental impact associated with the operation of Braidwood Station, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic ecological impacts will be small. Operational impacts to historic and archeologic sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights of way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socioeconomi effects of the project will be beneficial. On the basis of the analysis and evaluation set forth in this environmental statement, it is concluded that the action called for under NEPA and 10 CFR 51 is the issuance of operating licenses for Braidwood Station, Units 1 and 2

  12. Final environmental statement related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. STN 50-456 and STN 50-457)

    International Nuclear Information System (INIS)

    1984-06-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of Braidwood Station, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic ecological impacts will be small. Operational impacts to historic and archeologic sites will be moderate. The effects of routine operations, energy transmission, and periodic maintenance of rights of way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socioeconomic effects of the project will be beneficial. On the basis of the analysis and evaluation set forth in this environmental statement, it is concluded that the action called for under NEPA and 10 CFR 51 is the issuance of operating licenses for Braidwood Station, Units 1 and 2. 27 figures, 23 tables

  13. 75 FR 12312 - South Carolina Electric and Gas Company; Virgil C. Summer Nuclear Station, Unit 1; Exemption

    Science.gov (United States)

    2010-03-15

    ... cladding oxidation from the metal/water reaction shall be calculated using the Baker-Just equation. The... of energy release, hydrogen concentration, and cladding oxidation from the metal-water reaction shall... pressurized light-water nuclear power reactor fueled with uranium oxide pellets within cylindrical zircaloy or...

  14. Browns Ferry Nuclear Power Station, Units 1 and 2. Semiannual report, July--December 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Both units remained shutdown during this period. The majority of the operational activities concerned identification, removal, and repair of cables and trays damaged by the fire. Scheduled modifications, inspections, and testing were performed

  15. 77 FR 12885 - Millstone Power Station, Units 1, 2 and 3, Dominion Nuclear Connecticut, Inc.; Exemption

    Science.gov (United States)

    2012-03-02

    ... extraordinary circumstances that may be most effectively addressed through staff augmentation that can only be... significant effect on the quality of the human environment as published in the Federal Register on August 31...

  16. 76 FR 48184 - Exelon Nuclear, Peach Bottom Atomic Power Station, Unit 1; Exemption From Certain Security...

    Science.gov (United States)

    2011-08-08

    ... steam generators remain in place. The facility is permanently shut down in a SAFSTOR condition, defueled..., ``Domestic Licensing of Production and Utilization Facilities,'' to possess but not operate the facility. All...

  17. Dresden Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January--December 1977

    International Nuclear Information System (INIS)

    1978-01-01

    After a summary of reactor operating experiences, data are presented concerning amendments to the operating licenses and technical specifications, changes, modifications, tests, experiments, and maintenance of safety-related equipment

  18. 78 FR 37592 - Omaha Public Power District, Fort Calhoun Station, Unit 1; Exemption

    Science.gov (United States)

    2013-06-21

    ... provide licensees flexibility in scheduling required days off when accommodating the more intense work... implement the less restrictive work-hour requirements of 10 CFR 26.205(d)(4) to allow flexibility in... requirements for maximum average work hours in 10 CFR 26.205(d)(7). However, 10 CFR 26.205(d)(4) provides that...

  19. 76 FR 63668 - Omaha Public Power District; Fort Calhoun Station, Unit 1; Exemption

    Science.gov (United States)

    2011-10-13

    ... emergency plans biennially with full participation by each offsite authority having a role under the... organization personnel are familiar with their duties and to test the adequacy of emergency plans. Additionally... emergency response organization personnel are familiar with their duties, to test the adequacy of emergency...

  20. 76 FR 63671 - Omaha Public Power District, Fort Calhoun Station, Unit 1; Exemption

    Science.gov (United States)

    2011-10-13

    ... significant effect on the quality of the human environment (January 3, 2011; 76 FR 187). This exemption is... Regulatory Commission. Michele G. Evans, Director, Division of Operating Reactor Licensing, Office of Nuclear...

  1. 75 FR 10835 - Omaha Public Power District, Fort Calhoun Station, Unit 1, Environmental Assessment and Finding...

    Science.gov (United States)

    2010-03-09

    ...). There will be no change to radioactive effluents that affect radiation exposures to plant workers and... to historical and cultural resources. There would be no impact to socioeconomic resources. Therefore...

  2. Peach Bottom Atomic Power Station, Unit 1. Semiannual operations report No. 72, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Defueling of the reactor was completed in June 1975. The fuel will be shipped to Aerojet Nuclear Co. in Idaho for long term storage. The primary coolant and auxiliary helium systems are being shut down. Activities are briefly described concerning health physics and maintenance. (FS)

  3. ALARA organization in nuclear power stations

    International Nuclear Information System (INIS)

    Dollo, R.

    1997-01-01

    EDF's nuclear power stations were built with provisions being made, as from the design stage, to limit radiation sources and the results observed over the first ten years (annual collective dose and dose per unit of less than 2 man.Sv) were considered to be very good. However, these results began to deteriorate from 1988 onwards. At the same time, considerable progress was being made by other generators of electricity, who were achieving results which were better than those achieved by our later units. Furthermore, radiological protection standards are being revised and personal dose limits will soon be lowered. (authors)

  4. Economical dismantling of nuclear power stations

    International Nuclear Information System (INIS)

    Mallok, J.; Andermann, H.

    1999-01-01

    The dismantling of nuclear power stations requires a high degree of security and economic efficiency due to the strong contamination of components and the close spatial conditions. In order to protect involved staff from radiation, modern remote-controlled technology is applied in sectors with heavy radioactive contamination such as reactor pressure vessels. The article shows, that the dismantling of reactor pressure vessels using a remote-controlled milling machine developed by the Siemens subsidiary Mechanik Center Erlangen GmbH, can be done in a secure and efficient way. (orig.) [de

  5. Multivariable control in nuclear power stations

    International Nuclear Information System (INIS)

    Parent, M.; McMorran, P.D.

    1982-11-01

    Multivariable methods have the potential to improve the control of large systems such as nuclear power stations. Linear-quadratic optimal control is a multivariable method based on the minimization of a cost function. A related technique leads to the Kalman filter for estimation of plant state from noisy measurements. A design program for optimal control and Kalman filtering has been developed as part of a computer-aided design package for multivariable control systems. The method is demonstrated on a model of a nuclear steam generator, and simulated results are presented

  6. Pilot plant experiments at Wairakei Power Station

    International Nuclear Information System (INIS)

    Brown, Kevin L.; Bacon, Lew G.

    2009-01-01

    In the mid-1990s, several pilot plants were constructed at Wairakei to either improve the operational and economic performance of the power station or to mitigate the environmental effects of discharges to the Waikato River. The results of the following investigations are discussed: (1) fluid flow dynamic effects on silica scaling; (2) production of silica sols of predetermined particle size to evaluate the potential for generating commercial grade silica products; (3) use of 'sulfur oxidising bacteria' for the abatement of dissolved hydrogen sulphide in cooling water; (4) removal of arsenic from separated geothermal water; (5) steam line condensate corrosion; and (6) measurement and modelling of steam scrubbing in Wairakei's long steamlines. (author)

  7. CEGB nuclear power stations basic emergency plan

    International Nuclear Information System (INIS)

    1978-03-01

    The introduction states that this is a typical emergency plan for a nuclear power station employing about 500 people, having two reactors and a total electrical output of 500 Megawatts in an intensively farmed rural area. The document has the following headings: definitions ('site incident', etc); functions of the site emergency organization; conditions for taking emergency action; persons empowered to declare or cancel a site incident or an emergency; emergency actions by staff; control centres; communication; collaboration with other bodies; warnings; transport; house rules; public information centre. (U.K.)

  8. thermal power stations' reliability evaluation in a hydrothermal system

    African Journals Online (AJOL)

    Dr Obe

    A quantitative tool for the evaluation of thermal power stations reliability in a hydrothermal system is presented. ... (solar power); wind (wind power) and the rest, thermal power and ... probability of a system performing its function adequately for ...

  9. Solar dynamic power systems for space station

    Science.gov (United States)

    Irvine, Thomas B.; Nall, Marsha M.; Seidel, Robert C.

    1986-01-01

    The Parabolic Offset Linearly Actuated Reflector (POLAR) solar dynamic module was selected as the baseline design for a solar dynamic power system aboard the space station. The POLAR concept was chosen over other candidate designs after extensive trade studies. The primary advantages of the POLAR concept are the low mass moment of inertia of the module about the transverse boom and the compactness of the stowed module which enables packaging of two complete modules in the Shuttle orbiter payload bay. The fine pointing control system required for the solar dynamic module has been studied and initial results indicate that if disturbances from the station are allowed to back drive the rotary alpha joint, pointing errors caused by transient loads on the space station can be minimized. This would allow pointing controls to operate in bandwidths near system structural frequencies. The incorporation of the fine pointing control system into the solar dynamic module is fairly straightforward for the three strut concentrator support structure. However, results of structural analyses indicate that this three strut support is not optimum. Incorporation of a vernier pointing system into the proposed six strut support structure is being studied.

  10. Review and evaluation of Transamerica Delaval, Inc., diesel engine reliability and operability: Grand Gulf Nuclear Station Unit 1

    International Nuclear Information System (INIS)

    1984-07-01

    PNL and its consultants conclude that the TDI diesel engines at the GGNS have the needed operability and reliability to fulfill their intended (auxiliary) emergency power function for the first refueling cycle. This conclusion is reached with a number of understandings regarding limits to the engine requirements, NRC concurrence with MP and L findings/conclusions regarding items to be supplied to NRC, limitations on the engine Brake Mean Effective Pressure (BMEP), and MP and L's implementation of the modifications to their proposed surveillance and maintenance program

  11. 76 FR 55422 - Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Unit 1; Exemption

    Science.gov (United States)

    2011-09-07

    ... CFR 50.46, ``Acceptance criteria for emergency core cooling systems for light-water nuclear power... contain acceptance criteria for the emergency core cooling system (ECCS) for reactors fueled with zircaloy... CFR Part 50 (1) when the exemptions are authorized by law, will not present an undue risk to public...

  12. Robert Emmett Ginna Nuclear Power Plant, Unit 1. Annual report No. 11, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Information is presented concerning operations, power reductions, outages, personnel radiation exposures, failed fuel indications, procedure changes, system modification, and special tests. Results from radiation monitoring of dust, fallout, Lake Ontario water, well water, milk, fruit, aquatic ecosystems, and lake bottoms are tabulated

  13. Subsidence analysis Forsmark nuclear power plant - unit 1; Saettningsanalys Forsmarks kaernkraftverk - aggregat 1

    Energy Technology Data Exchange (ETDEWEB)

    Bono, Nancy; Fredriksson, Anders; Maersk Hansen, Lars (Golder Associates AB (Sweden))

    2010-12-15

    On behalf of SKB, Golder Associates Ltd carried out a risk analysis of subsidence during Forsmark nuclear power plant in the construction of the final repository for spent nuclear fuel near and below existing reactors. Specifically, the effect of horizontal cracks have been studied.

  14. Donald C. Cook Nuclear Power Plant, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit was paralleled to the grid 83.1 percent of the time and 7,073,200 MWH gross was generated. There were six scheduled outages and 14 forced outages/load reductions. Information is presented concerning operations, shutdowns, power reductions, inservice maintenance, personnel radiation exposures, fuel history, and facility changes

  15. Palo Verde Nuclear Generating Station Units 1, 2, and 3: Draft environmental statement (Docket Nos. STN 50-528, 529, and 530)

    International Nuclear Information System (INIS)

    1975-04-01

    The proposed action is the issuance of construction permits to the Arizona Public Service Corporation for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2 and 3. Preparation of the 3880-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will be permanently devoted to station facilities. An additional 1200- to 1300-acre evaporation pond will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use (Sec. 4. 1). Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation in local ephemeral water courses. Stringent measures will be taken to minimize these effects (Sec. 4.5). Station, transmission line, and water pipeline construction will kill, remove displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects (Sec. 4.3 and 4.5). Approximately 60 acres of agricultural land will be temporarily affected by construction in transmission corridors. The great majority can be returned to that use upon completion of construction, thus the impact is considered minor. Similarly, most grazing lands affected along these corridors, as well as along the water pipeline corridor, can eventually be returned to that use. New archaeological resources could be discovered along the path of final transmission corridor alignments. The applicant will take measures to locate and protect such resources if they exist. 75 refs., 24 figs., 65 tabs

  16. Slovak power stations (Annual report 1997)

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities carried out by the Slovak power stations, s.a. (SE) in 1997 is presented. These activities are reported under the headings: (1) Foreword of the chairman of the Board of directors; (2) Highlights of 1997; (3) Board of directors; (4) Supervisory board; (5) Organisation structure of SE; (6) Branches of SE; (7) Auditor's report; (8) Balance sheet / Economic balance; (9) Economic results; (10) Analysis of economic result; (11) SE capital investment in other trade companies; (12) Basic data; (13) Management and operation of the Slovak Republic's power system; (14) Labour safety and health, fire protection; (15) Electricity trade; (16) Trade heat; (17) Customer services provided to electricity users (18) Investment programme; (19) Environmental protection; (20) Support of renewable; (21) Nuclear safety; (22) Quality system; (23) International co-operation; (24) Centrel; (25) Information technology; (26) Public relations; (27) Business strategy and development programme; (28) Strategic change programme

  17. Iodine filters in nuclear power stations

    International Nuclear Information System (INIS)

    Wilhelm, J.G.

    1977-04-01

    On the basis of calculated and recorded release rates of nuclear power plants, the significance of iodine releases in the invironmental impact relative to other nuclides is discussed. The release pathways for iodine in LWR-type reactors and the efficiency of various methods to lower the activity release are given. The airborne species of iodine are discussed with regard to their removal in iodine sorption filters and environmental impact. The technical status of iodine removal by means of iodine sorption filters is studied for normal operation and accident conditions in nuclear power stations on the basis of the data given in the relevant literature for the efficiency of a number of iodine sorption materials. The applicability of concepts for ventilation and containment and their influence on iodine filter systems are discussed. Design, structure, and testing of iodine sorption filters are treated in detail; recommendations for design are given, and failure sources are mentioned. (orig.) [de

  18. Neutron spectrum measurement inside containment vessel at Kori nuclear power plant unit 1

    Energy Technology Data Exchange (ETDEWEB)

    Han, J. M.; Kim, T. W.; Kim, K. D.; Youn, C. H. [Nuclear Environment Technology Institute, Taejon (Korea, Republic of)

    2003-10-01

    There would be a case for the radiation worker have to work inside of the containment vessel to inspect or repair reactor facilities. In this case, the information about distribution of neutron field is needed to estimate neutron exposure dose of worker. Neutron spectra were measured by BMS(Bonner Multisphere Spectrometer) at 4 points of 6 ft and 20 ft, 2 points of 44 ft, 5 points of 70 ft in containment vessel of Kori unit 1. From the calculation, the following results were obtained. Neutron fluxes of 6 ft were between 2.623 x 10{sup 2} and 2.746 x 10{sup 4} neutron/cm{sup 2}{center_dot}sec, average neutron energies were between 9.209 x 10{sup -6} and 3.377 x 10{sup -2} MeV, equivalent doses of neutron were between 0.025 and 2.675 mSv/hr. Neutron fluxes of 20 ft were between 1.771 x 10{sup 1} and 1.682 x 10{sup 3} neutron/cm{sup 2}{center_dot}sec, average neutron energies were between 6.084 x 10{sup -6} and 2.988 x 10{sup -1} MeV, equivalent doses of neutron were between 0.004 and 0.228 mSv/hr. Neutron fluxes of 44 ft were between 3.367 x 10{sup 2} and 3.483 x 10{sup 2} neutron / cm{sup 2}{center_dot}sec, average neutron energies were between 3.962 x 10{sup -2} and 7.360 x 10{sup -2} MeV, equivalent doses of neutron were between 0.069 and 0.089 mSv/hr. Neutron fluxes of 70 ft were between 4.553 x 10{sup 3} and 1.407 x 10{sup 4} neutron/cm{sup 2}{center_dot}sec, average neutron energies were between 3.668 x 10{sup -4} and 6.764 x 10{sup -2} MeV, equivalent doses of neutron were between 0.449 and 2.660 mSv/hr.

  19. The regional issues involved in the siting of power stations

    International Nuclear Information System (INIS)

    Livingstone, R.

    1980-01-01

    This paper deals with the regional implications of power station siting in England and Wales and refers to the procedures used by the CEGB to find and develop sites. The resources required for a power station are outlined both for conventional and nuclear stations and the possible development of uses for the rejected heat from power stations as a result of the energy crisis is discussed. (U.K.)

  20. Water Hammer Analysis using RELAP5/MOD 3.3 for Yonggwang Nuclear Power Unit 1 and 2 Blowdown System

    International Nuclear Information System (INIS)

    Lee, Sang Il; Kim, Hea Zoo; Chu, Jung Ho; Ahn, Se Hong; Jung, Chang Ho

    2010-01-01

    Water hammer can be defined as a rapid pressure step occurring in the liquid in a closed pipe caused by a sudden change in the liquid velocity. This pressure acts for a period which is twice the transit time of sonic wave in the pipe. Generally, water hammer can occur in any thermal-hydraulic systems like nuclear power plant and is extremely dangerous for nuclear power plant piping system since, if the pressure induced exceeds the pressure range of the pipe given by the manufacturer, it can lead to the failure of the piping system integrity. For Yonggwang nuclear power unit 1 and 2, water hammer occurred repeatedly on the outlet piping of regenerative heat exchanger of steam generator blowdown system. Thus, design modification was performed to prevent the water hammer and the analysis of effect on water hammer before and after design modification was performed to verify the validity of the design modification

  1. Forecasting Canadian nuclear power station construction costs

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequences of the decision as possible. This understanding must be provided by the evaluation of future situations. A key consideration in an evaluation is the financial component. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A brief review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A database is built and indexes are prepared. Based on these indexes, an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of 40 years are generated and applications (such as alternative scenario forecasts and range forecasts) to uncertainty assessment and/or decision-making are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the first for Canadian NGS constructions. (author)

  2. Regulatory experience in nuclear power station decommissioning

    International Nuclear Information System (INIS)

    Ross, W.M.; Waters, R.E.; Taylor, F.E.; Burrows, P.I.

    1995-01-01

    In the UK, decommissioning on a licensed nuclear site is regulated and controlled by HM Nuclear Installations Inspectorate on behalf of the Health and Safety Executive. The same legislative framework used for operating nuclear power stations is also applied to decommissioning activities and provides a continuous but flexible safety regime until there is no danger from ionising radiations. The regulatory strategy is discussed, taking into account Government policy and international guidance for decommissioning and the implications of the recent white paper reviewing radioactive waste management policy. Although each site is treated on a case by case basis as regulatory experience is gained from decommissioning commercial nuclear power stations in the UK, generic issues have been identified and current regulatory thinking on them is indicated. Overall it is concluded that decommissioning is an evolving process where dismantling and waste disposal should be carried out as soon as reasonably practicable. Waste stored on site should, where it is practical and cost effective, be in a state of passive safety. (Author)

  3. Siting technology of underground nuclear power station

    International Nuclear Information System (INIS)

    Motojima, M.; Hibino, S.

    1989-01-01

    For the site of a nuclear power station, it may be possible to select a seaside mountain area, if the condition is suitable to excavate large rock caverns in which a reactor and other equipments are installed. As the case study on the siting technology for an underground nuclear power station, the following example was investigated. The site is a seaside steep mountain area, and almost all the equipments are installed in plural tunnel type caverns. The depth from the ground surface to the top of the reactor cavern is about 150 m, and the thickness of the rock pillar between the reactor cavern of 33 m W x 82 mH x 79 mD and the neighboring turbine cavern is 60 m. In this paper, the stability of rock caverns in this example, evaluated by numerical analysis, is described. The numerical analysis was carried out on the central cross section of the reactor cavern, taking the turbine cavern, geostress, the mechanical properties of rock mass and the process of excavation works in consideration. By the analysis, the underground caverns in this example were evaluated as stable, if the rock quality is equivalent to C H class or better according to the CRIEPI rock classification. (K.I.)

  4. Structural review of the Palisades Nuclear Power Plant Unit 1 containment structure under combined loads for the Systematic Evaluation Program

    International Nuclear Information System (INIS)

    Liaw, C.Y.; Debeling, A.; Tsai, N.C.

    1981-12-01

    A structural reassessment of the containment structure of the Palisades Nuclear Power Plant Unit 1 was performed for the Nuclear Regulatory Commission as part of the Systematic Evaluation Program. Conclusions about the ability of the containment structure to withstand the Abnormal/Extreme Environment are presented. The reassessment focused mainly on the overall structural integrity of the containment building for the Abnormal/Extreme Environment. In this case, the Abnormal Environmental condition is caused by the worst case of either a Loss-of-Coolant Accident or a main steam line break. The Extreme Environmental condition is the Safe Shutdown Earthquake

  5. Actinides inventory of the nuclear power plant of Laguna Verde Unit 1

    International Nuclear Information System (INIS)

    Martinez C, E.; Ramirez S, J. R.; Alonso V, G.

    2013-10-01

    At the present time 435 nuclear power reactors exist for the electricity generation operating in the world and 63 in construction. Mexico has two reactors type BWR in the nuclear power plant of Laguna Verde. The nuclear fuel that is used in the nuclear reactors is retired of the reactor core when the energy that this contained has been extracted. This used fuel is known as spent nuclear fuel, the problem with this fuel is that was irradiated inside the reactor and continuous emitting a high radiation, as well as a significant heat quantity when being extracted, for what is necessary to maintain it in cooling and with some shielding to be protected of the radiation that emits. This objective is achieved confining the fuel in the spent nuclear fuel pool, where it is cooled and the same pool provides the necessary shielding to maintain the surroundings in safety radiation levels for the personnel that work in the power plant. An inconvenience of the pools is its limited storage capacity and that after certain time is necessary to remove the fuel, according to the established regulation to continue operating. To correct this inconvenience, two alternatives of spent fuel disposition exist, 1) the final disposition in deep geologic repositories and 2) the reprocessing and recycled of spent fuel. Each alternative presents its particularities and specific problems; however taking many years to be able to implement anyone of them. To carry out the second option, is indispensable to estimate the total mass of actinides generated in the spent nuclear fuel, that which represents to develop a methodology for it, this action is the main purpose of the present work. Inside our calculation method was necessary to appeal to diverse computation tools as the codes Origin-S and Keno V.a. Later on the obtained were compared with a problem type Benchmark, being obtained a smaller absolute error to 1.0%. (Author)

  6. Quality assurance evolution at Laguna Verde Nuclear Power Plant Unit 1 and 2, regulatory aspects

    International Nuclear Information System (INIS)

    Leon Martinez, Cenobia

    1996-01-01

    Quality Assurance (QA) in Mexico started with the construction of the Laguna Verde Nuclear Power Plant. The Nuclear Regulatory Body, based in the adopted regulation, required the use of Quality Assurance in the design, construction and operation of the Plant. This paper describes the evolution of QA from its beginnings, through its developing phase up to this time, and shows the role of the Regulatory Body, which has participated actively in the implantation of QA in a properly manner, enforcing the utility in avoiding deviations and non-compliancies with the established regulation. (author)

  7. Draft environmental statement related to the operation of Limerick Generating Station, Units 1 and 2. Docket Nos. 50-352 and 50-353

    International Nuclear Information System (INIS)

    1983-06-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of the Limerick Generating Station, Units 1 and 2, pursuant to the National Environment Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic ecological impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights of way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity

  8. Safety evaluation report related to the operation of Seabrook Station, Units 1 and 2. Docket Nos. 50-443 and 50-444. Suppl. 1

    International Nuclear Information System (INIS)

    1983-04-01

    This report supplements the Safety Evaluation Report (NUREG-0896, March 1983) for the application filed by the Public Service Company of New Hampshire, et. al., for licenses to operate Seabrook Station, Units 1 and 2 (Docket Nos. STN 50-443 and STN 50-444). It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information on open items identified in the SER. The facility is located in Seabrook, New Hampshire. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  9. Safety Evaluation Report related to the operation of Seabrook Station, Units 1 and 2 (Docket Nos. 50-443 and 50-444)

    International Nuclear Information System (INIS)

    1989-05-01

    This report is Supplement No. 8 to the Safety Evaluation Report (SER) (NUREG-0896, March 1983) for the application filed by the Public Service Company of New Hampshire, et al., for licenses to operate Seabrook Station, Units 1 and 2 (Docket Nos. STN 50-443 and STN 50-444). It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information on open items identified in the SER. The facility is located in Seabrook, New Hampshire. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public. 2 figs., 1 tab

  10. Safety Evaluation Report related to the operation of Seabrook Station, Units 1 and 2 (Docket Nos. 50-443 and 50-444). Supplement No. 5

    International Nuclear Information System (INIS)

    1986-07-01

    This report is Supplement No. 5 to the Safety Evaluation Report (NUREG-0896, March 1983) for the application filed by the Public Service Company of New Hampshire, et al., for licenses to operate Seabrook Station, Units 1 and 2 Docket Nos. STN 50-443 and STN 50-444). It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information on open items identified in the SER. The facility is located in Seabrook, New Hampshire. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  11. Safety Evaluation Report related to the operation of Seabrook Station, Units 1 and 2 (Docket Nos. 50-443 and 50-444)

    International Nuclear Information System (INIS)

    1990-03-01

    This report is Supplement No. 9 to the Safety Evaluation Report (SER) (NUREG-0896, March 1983) for the application filed by the Public Service Company of New Hampshire, et al., for licenses to operate Seabrook Station, Units 1 and 2. It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information on open items identified in the SER. The facility is located in Seabrook, New Hampshire. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public. 70 refs., 1 fig., 1 tab

  12. Final environmental statement related to the operation of Byron Station, Units 1 and 2 (Docket Nos. STN 50-454 and STN 50-455)

    International Nuclear Information System (INIS)

    1982-04-01

    The proposed action is the issuance of an operating license to Commonwealth Edison Company (CECo) of Chicago, Illinois, for startup and operation of the Byron Station, Units 1 and 2 on a 710-ha (1754-acre) site in Ogle County 6 km (4 miles) south-southwest of Byron, Illinois, and 3 km (2 miles) east of the Rock River. Each of the two generating units consists of a pressurized-water reactor, four steam generators, one steam turbine generator, a heat-dissipation system, and associated auxiliary and engineered safeguards. Information is presented under the following topics: purpose and need for the action; alternatives to the proposed action; project description and affected environment; environmental consequences and mitigating actions; evaluation of the proposed action; list of contributors; list of agencies and organizations requested to comment on the draft environmental statement; and responses to comments on the Draft Environmental Statement

  13. Safety evaluation report related to the operation of Seabrook Station, Units 1 and 2 (Docket Nos. 50-443 and 50-444)

    International Nuclear Information System (INIS)

    1986-05-01

    This report is Supplement 4 to the Safety Evaluation Report (SER, NUREG-0896, March 1983) for the application filed by the Public Service Company of New Hampshire, et al., for licenses to operate Seabrook Station, Units 1 and 2 (Docket Nos. STN 50-443 and STN 50-444). It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information on open items identified in the SER. The facility is located in Seabrook, New Hamphsire. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  14. Safety evaluation report related to the operation of Seabrook Station, Units 1 and 2 (Docket Nos. 50-443 and 50-444)

    International Nuclear Information System (INIS)

    1987-10-01

    This report is Supplement No. 7 to the Safety Evaluation Report (NUREG-0896, March 1983) for the application filed by the Public Service Company of New Hampshire, et al. for licenses to operate Seabrook Station, Units 1 and 2 (Docket Nos. STN 50-443 and STN 50-444). It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information on open items identified in the SER. The facility is located in Seabrook, New Hampshire. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  15. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2. Docket Nos. 50-445 and 50-446

    International Nuclear Information System (INIS)

    1983-03-01

    Supplement No. 3 to the Safety Evaluation Report (SER) related to the operation of the Comanche Peak Steam electric Station, Units 1 and 2, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. the facility is located in Somervell County, Texas. Subject to favorable resolution of the items identified in this supplement, the staff concludes that the facility can be operated by the applicatn without endangering the health and safety of the public. This document provides the NRC staff's evaluation of the outstanding and confirmatory issues that have been resolved since Supplement No. 2 was issued in January 1982, and addresses changes to the SER and its earlier supplements which have resulted from the receipt of additonal information from the applicant during the period of January throught October 1982

  16. Safety Evaluation report related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. STN 50-456 and STN 50-457)

    International Nuclear Information System (INIS)

    1987-07-01

    In November 1983, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1002) regarding the application filed by the Commonwealth Edison Company, as applicant and owner, for a license to operate Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457). The first supplement to NUREG-1002 was issued in September 1986; the second supplement to NUREG-1002 was issued in October 1986; the third supplement to NUREG-1002 was issued in May 1987. This fourth supplement to NUREG-1002 reports the status of certain items that remained unresolved at the time Supplement 3 was published. The facility is located in Reed Township, Will County, Illinois

  17. Safety-evaluation report related to the operation of Seabrook Station, Units 1 and 2. Docket Nos. 50-443 and 50-444

    International Nuclear Information System (INIS)

    1983-06-01

    This report is Supplement 2 to the Safety Evaluation Report (NUREG-0896, March 1983) for the application filed by the Public Service Company of New Hampshire, et al., for licenses to operate Seabrook Station, Units 1 and 2 (Docket Nos. STN 50-443 and STN 50-444). It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information on open items identified in the SER. The facility is located in Seabrook, New Hampshire. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  18. Safety evaluation report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1988-11-01

    Supplement 19 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 (NUREG-0797), has been prepared by the Office of Special Projects of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement presents the staff's evaluation of the Texas Utilities Electric Company's (lead applicant's) corrective action program (CAP) related to equipment qualification. The scope and methodology for the CAP workscope, as summarized in Revision 0 to the Equipment Qualification Project Status Report and as detailed in related documents, were developed to resolve various issues raised by the Comanche Peak Response Team (CPRT) and the NRC staff to ensure that plant equipment is appropriately environmentally and/or seismically and dynamically qualified and documented in accordance with the validated plant design resulting from other CAP scopes of work for Unit 1 and areas common to Units 1 and 2. The staff concludes that the CAP workscope for equipment qualification provides a comprehensive program for resolving the concerns identified by the CPRT and the NRC staff, including issues raised in the Comanche Peak Safety Evaluation Report and its supplements, and its implementation will ensure that the environmental and/or seismic and dynamic qualification of equipment at CPSES satisfies the validated plant design and the applicable requirements of 10 CFR Part 50. As is routine staff practice, the NRC staff will verify the adequacy of implementation of the environmental and seismic and dynamic equipment qualification program at CPSES during inspections that will take place before fuel loading. 97 refs

  19. Improvement of nuclear core power distribution analysis for Ulchin unit 1 and 2

    International Nuclear Information System (INIS)

    Chang, Jong Hwa; Zee, Sung Kyoon; Lee, Sang Ho; Park, Yong Soo; Lee, Chang Ho; Choi, Young Kil; Kim, Hee Kyung; Cho, Young Sik; Cho, In Hang

    1994-12-01

    The FMCP package which does the power shape analysis of Framatom type of reactors on IBM mainframe, is migrated to an IBM-PC system. This report describes the related technique and works. An IBM-PC software DAP is developed to replace the plant computer attached 8 inch floppy disk driver to an IBM-PC. Other programs of FMCP, such as CEDRIC, CARIN and ESTHER, are also migrated to an IBM-PC using Lahey Fortran 77 compiler. A few auxiliary programs are also developed for easy handling of FMCP in the IBM-PC environment. This report describes the usage of the developed system as well as the migration related techniques. (Author) 4 figs

  20. Technical evaluation of the proposed deletion of a reactor trip on a turbine trip below 50-percent power for the Beaver Valley nuclear power plant, Unit 1

    International Nuclear Information System (INIS)

    Reeves, W.E.

    1979-12-01

    This report documents the technical evaluation of the Duquesne Light Company's proposed license amendment for the deletion of a reactor trip on a turbine trip below 50% power for the Beaver Valley nuclear power plant, Unit 1. This report is supplied as part of the Selected Electrical, Instrumentation, and Control Systems Issues Program being conducted for the US Nuclear Regulatory Commission by Lawrence Livermore Laboratory

  1. Alteration in reactor installation (addition of Unit 2) in Shimane Nuclear Power Station, Chugoku Electric Power Co., Inc. (inquiry)

    International Nuclear Information System (INIS)

    1983-01-01

    An inquiry was made by the Ministry of International Trade and Industry to Nuclear Safety Commission on the addition of Unit 2 in Shimane Nuclear Power Station of The Chugoku Electric Power Co., Inc., concerning the technical capability of Chugoku Electric Power Co., Inc., and the plant safety. The NSC requested the Committee on Examination of Reactor Safety to make a deliberation on this subject. Both the technical capability and the safety of Unit 1 were already confirmed by MITI. Unit 2 to be newly added in the Shimane Nuclear Power Station is a BWR power plant with electric output of 820 MW. The examination made by MITI is described: the technical capability of Chugoku Electric Power Co., Inc., the safety of Unit 2 about its siting, reactor proper, reactor cooling system, radioactive waste management, etc. (J.P.N.)

  2. Lessons learned from our accident at Fukushima nuclear power stations

    International Nuclear Information System (INIS)

    Kawano, A.

    2012-01-01

    This paper is given in order to share the detailed information on the Fukushima Accident which occurred on March 11, 2011, and the lessons learned from it which worldwide nuclear experts might currently have more interest in. The paper first reflects how the facilities were damaged by a very strong earthquake and a series of beyond design-basis tsunamis. The earthquake caused loss of all off-site electric power at Fukushima Daiichi Nuclear Power Station (1F), and the following series of tsunami made all emergency diesel generators except one for Unit 6 and most of DC batteries inoperable and severely damaged most of the facilities located on the ocean side. Thus all the units at 1F resulted in the loss of cooling function and ultimate heat sink for a long time period. TEPCO focused on restoration of the instruments and lights in the Main Control Room (MCR), preparation of alternative water injection and venting of Primary Containment Vessel (PCV) in the recovery process. However, the workers faced a lot of difficulties such as total darkness, repeated aftershocks, high radiation dose, a lot of debris on the ground, loss of communication means, etc. Massive damages by the tsunami and lack of necessary equipments and resources hampered a quick recovery. It eventually resulted in the severe core damage of Unit 1, 2, and 3 and also the hydrogen explosions in the reactor buildings of Unit 1, 3, and 4. This paper finally extracts the lessons learned from the accident and proposes the countermeasures, such as flood protection for essential facilities, preparation of practical and effective tools, securing communication means and so on. These would help the people involved in the nuclear industries all over the world properly understand the accident and develop their own countermeasures appropriately. (authors)

  3. Long-term measurement with calorimetric probes at unit 1 of V-1 nuclear power plant

    International Nuclear Information System (INIS)

    Erben, O.; Szasz, Z.; Jirousek, V.; Teren, S.

    1989-01-01

    Two calorimetric probes were tested at the first unit of the Bohunice V-1 nuclear power plant in long-term operation, i.e., during one whole reactor duty time. Each probe consisted of five fission calorimeters and one compensation calorimeter with a tungsten body. The actual calorimeters were provided with jacketed thermocouples 0.5 mm indiameter and 19 m in length. A detailed description is presented of the measuring chains and measurement techniques. Also described is the method of the disposal of the irradiated probes. The method is presented of the evaluation of measured data and the results are discussed of the analysis of these data. The measurements, including measurements during reactor shut-down and the results of the analysis of the measured data proved good viability and stability of the used calorimetres. The method of measuring the thermocouple signals is simple and the in-service evaluation of required data is quick. In order to increase measurement efficiency it would be appropriate to complete the measuring chain and to automate it. Reliability is a affected merely by protecting the thermocouples against mechanical damage during measurement probe handling and on the reactor. (Z.M.). 5 figs., 5 tabs., 5 refs

  4. Fire safety in nuclear power stations

    International Nuclear Information System (INIS)

    Kench, R.L.

    1988-01-01

    This is the first of a three-part report on the fire hazards in nuclear power stations and some of the precautions necessary. This part lists the United Kingdom reactors, outlines how they work, the fuels used, the use of moderators and coolants and the control systems. Although the risk of fire is no higher than in fossil-fuel stations the consequences can be more serious. The radioactive materials used mean that there is biological shielding round the core, limitations on waste emissions allowed and limited access to some zones. Reliable shut-down systems are needed. Care in the use of water to fight fires must be exercised -it can act as a moderator and cause an otherwise safe core to go critical. The Wigner effect in graphite moderated reactors is explained. Fires in graphite can be extinguished by carbon dioxide. Argon, chlorine and sodium silicate can also be effective. In sodium cooled reactors fires can be allowed to burn themselves out, or TEC and argon could be used to extinguish the flame. (UK)

  5. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Arnold, P.J.

    1982-11-01

    The systems benefits of the selection of the Sizewell site for a PWR power station are dealt with. The transmission modifications which would be needed to provide effective connection of this station to the system are considered. (U.K.)

  6. Operating experience of Fugen Nuclear Power Station

    International Nuclear Information System (INIS)

    Ohteru, Shigeru; Kaneko, Jun; Kawahara, Toshio; Matsumoto, Mitsuo

    1987-01-01

    The prototype ATR 'Fugen' developed as one of the national project has verified the performance and reliability of the advanced thermal reactor system through the operation for about eight years since 1979, and the elucidation of the characteristics in plutonium utilization and the development and verification of the tuilizing techniques have been advanced. Besides, the operational results and the achievement of the technical development are successively reflected to the design of a demonstration reactor. In this paper, the outline of Fugan and the operational results are reported. The ATR Fugen Power Station is that of the prototype reactor of heavy water moderated, boiling light water cooled, pressure tube type, having the electric output of 165 MW. It started the full scale operation on March 20, 1979, and as of January, 1987, the total generated electric power reached about 7 billion kWh, the time of power generation was about 43,000 h, and the average capacity factor was 60.6 %. Plutonium utilization techniques, the flow characteristics and the dynamic plant characteristics of a pressure tube type reactor, the operational characteristics of a heavy water system and the techniques of handling heavy water containing tritium, and the operational reliability and maintainability of the machinery and equipment installed have been studied. (Kako, I.)

  7. Nuclear power station main control room habitability

    International Nuclear Information System (INIS)

    Paschal, W.B.; Knous, W.S.

    1989-01-01

    The main control room at a nuclear power station must remain habitable during a variety of plant conditions and postulated events. The control room habitability requirement and the function of the heating, ventilating, air-conditioning, and air treatment system are to control environmental factors, such as temperature, pressure, humidity, radiation, and toxic gas. Habitability requirements provide for the safety of personnel and enable operation of equipment required to function in the main control room. Habitability as an issue has been gaining prominence with the Advisor Committee of Reactor Safeguards and the Nuclear Regulatory Commission since the incident at Three Mile Island. Their concern is the ability of the presently installed habitability systems to control the main control room environment after an accident. This paper discusses main control room HVAC systems; the concern, requirements, and results of NRC surveys and notices; and an approach to control room habitability reviews

  8. Risk-based assessment of the allowable outage times for the unit 1 leningrad nuclear power plant ECCS components

    International Nuclear Information System (INIS)

    Koukhar, Sergey; Vinnikov, Bronislav

    2009-01-01

    Present paper describes a method for risk - informed assessment of the Allowable Outage Times (AOTs). The AOT is the time, when components of a safety system allowed to be out of service during power operation or during shutdown operation off a plant. If the components are not restored during the time, the plant in operation must be shut down or the plant in a given shutdown mode has to go to safer shutdown mode. Application of the method is also provided for the equipment of the Unit 1 Leningrad NPP ECCS components. For solution of the problem it is necessary to carry out two series of computations using a Living PSA model, level 1. In the first series of the computations the core damage frequency (CDFb) for the base configuration of the plant is determined (there is no equipment out of service). Here the symbol 'b' means the base configuration of a plant. In the second series of the computations the core damage frequency (CDFi) for the configuration of the plant with the component (which is out of service) is calculated. That is here CDFi is determined for the failure probability of the component equal to 1.0 (component 'i' is unavailable). Then it is necessary to determine so called Risk Increase Factor (RIF) using the following ratio: RIFi = CDFi / CDFb. At last the AOT is calculated with the help of the ratio: AOTi = Tppr / RIFi, where Tppr is a period of time between two Planned Preventive Repairs (PPRs). 1. Using the risk based approach the AOTs were calculated for a set of the components of the Unit 1 Leningrad NPP ECCS components. 2. The main conclusion from the analysis is that the current deterministic AOTs for the ECCS components are conservative and should be extended. 3. The risk based extension of the AOTs for the ECCS components can prevent the Unit 1 Leningrad NPP to enter into the operating modes with increased risk. (author)

  9. Living near a nuclear power station

    International Nuclear Information System (INIS)

    Marcan, P.; Slovak, K.

    2007-01-01

    The need to expand nuclear power and its advantages are discussed publicly nearly each week. According to politicians and the nuclear lobby investing tens of billions Sk at Mochovce will bring Slovakia the often cited 'independence and energy self-sufficiency'. It will also mean profit for Slovenske elektrarne and the company's shareholders - the state and Italian company, Enel. In addition to the lively discussion on the pros and cons of nuclear energy, TREND was also interested in the living conditions around the concrete and strictly guarded, potentially dangerous plants and in the opinion of the people most affected by Mochovce and Jaslovske Bohunice on expansion of the existing and the building of new nuclear power plants. The construction of nuclear powers stations in these regions was not only about new jobs. The state 'prescribed' iodine pills and did not allow any construction in the region and, in the case of Mochovce, ordered the complete demolition of a village. The only thing that remained from Mochovce village was the church. 'And when it was found that the power plant would not reach it, it was even given a new roof. Former inhabitants, especially the older ones that had problems accepting the evacuation, used to visit it often,' explained Jan Foldy, the head of the local municipality in Kalna nad Hronom. After many years, life in the neighbouring villages is not bad. Their budgets are overflowing and so they can afford to spoil their inhabitants with free cable TV and high standard sport facilities, which should partly compensate for the fact that the people are living so close to a nuclear facility. (authors)

  10. Valves for condenser-cooling-water circulating piping in thermal power station and nuclear power station

    International Nuclear Information System (INIS)

    Kondo, Sumio

    1977-01-01

    Sea water is mostly used as condenser cooling water in thermal and nuclear power stations in Japan. The quantity of cooling water is 6 to 7 t/sec per 100,000 kW output in nuclear power stations, and 3 to 4 t/sec in thermal power stations. The pipe diameter is 900 to 2,700 mm for the power output of 75,000 to 1,100,000 kW. The valves used are mostly butterfly valves, and the reliability, economy and maintainability must be examined sufficiently because of their important role. The construction, number and arrangement of the valves around a condenser are different according to the types of a turbine and the condenser and reverse flow washing method. Three types are illustrated. The valves for sea water are subjected to the electrochemical corrosion due to sea water, the local corrosion due to stagnant water, the fouling by marine organisms, the cavitation due to valve operation, and the erosion by earth and sand. The fundamental construction, use and features of butterfly valves are described. The cases of the failure and repair of the valves after their delivery are shown, and they are the corrosion of valve bodies and valve seats, and the separation of coating and lining. The newly developed butterfly valve with overall water-tight rubber lining is introduced. (Kako, I.)

  11. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  12. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Dockets Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1987-03-01

    Supplement No. 11 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizone, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of (1) additional information submitted by the applicant since Supplement No. 10 was issued and (2) other matters requiring staff review since Supplenent No. 10 was issued, specifically those issues that required resolution before Unit 3 low-power licensing

  13. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530). Supplement No. 9

    International Nuclear Information System (INIS)

    1985-12-01

    Supplement No. 9 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of: (1) additional information submitted by the applicant since Supplement No. 8 was issued; and (2) matters that the staff had under review when Supplement No. 8 was issued, specifically those issues which required resolution prior to Unit 2 fuel loading and testing up to 5% of full power

  14. Safety Evaluation Report related to the operation of LaSalle County Station, Units 1 and 2. Docket Nos. 50-373 and 50-374

    International Nuclear Information System (INIS)

    1984-03-01

    This supplement to the Safety Evaluation Report of Commonwealth Edison Company's application for a license to operate its La Salle County Station, Unit 2, located in Brookfield Township, La Salle County, Illinois, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement is to update evaluations on Unit 2 issues identified in the previous Safety Evaluation Report and Supplements that need resolution prior to issuance of the full power operating license for Unit 2

  15. User Context Aware Base Station Power Flow Model

    OpenAIRE

    Walsh, Barbara; Farrell, Ronan

    2005-01-01

    At present the testing of power amplifiers within base station transmitters is limited to testing at component level as opposed to testing at the system level. While the detection of catastrophic failure is possible, that of performance degradation is not. This paper proposes a base station model with respect to transmitter output power with the aim of introducing system level monitoring of the power amplifier behaviour within the base station. Our model reflects the expe...

  16. Increasing the efficiency of thermal power stations

    International Nuclear Information System (INIS)

    Schwarz, N.F.

    1984-01-01

    High energy prices and an increased investment of costs in power plants as well as the necessity to minimize all kinds of environmental pollution have severe consequences on the construction and operation of thermal power stations. One of the most promising measures to cope with the mentioned problems is to raise the thermal efficiency of power plants. With the example of an Austrian electric utility it can be shown that by application of high efficiency combined cycles primary energy can be converted into electricity in a most efficient manner. Excellent operating experience has proved the high reliability of these relatively complex systems. Raising the temperature of the gas topping process still higher will not raise the efficiency considerably. In this respect a Rankine cycle is superior to a Brayton cycle. In a temperature range of 850 to 900 0 C were conventional materials with known properties can still be used, only the alkali metals cesium and potassium have the necessary physical and thermodynamic properties for application in Rankine topping cycles. Building on experience gained in the Fast Breeder development and from the US space program, a potassium topping cycle linked to a conventional water steam cycle with an intermediate diphenyl vapour cycle has been proposed which should give thermal efficiencies in excess of 50%. In a multi-national program this so called Treble Rankine Cycle is being investigated under the auspices of the International Energy Agency. Work is in progress to investigate the technical and economic feasibility of this energy conversion system. Experimental investigations are already under way in the Austrian Research Center Seibersdorf where high temperature liquid metal test facilities have been operated since 1968. (Author)

  17. The Wm. H. Zimmer Nuclear Power Station: Draft environmental statement (Docket No. 50-358)

    International Nuclear Information System (INIS)

    1976-10-01

    The proposed action is the issuance of an operating license to the Cincinnati Gas and Electric Company, the Columbus and Southern Ohio Electric Company, and the Dayton Power and Light Company for the startup and operation of the Wm. H. Zimmer Nuclear Power Station (Docket No. 50-358) (the station), located on the Ohio River in Clermont County, about 24 miles southeast of Cincinnati, Ohio. The information in this statement represents the second assessment of the environmental impact associated with the Zimmer Nuclear Power Station pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51 of the Commission's Regulations. After receipt of an application in 1970 to construct this plant, the staff carried out a review of impact that would occur during the plant's construction and operation. This evaluation was issued as a final environmental statement in September 1972. As the result of this environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and a public hearing in Cincinnati, Ohio, the AEC (now NRC) issued a permit in October 1972 for the construction of Unit 1 of the Zimmer Nuclear Power Station. As of June 1976, the construction of the plant was 54% complete. With a proposed fuel-loading data of April 1978, the applicant has petitioned for license to operate Unit 1 and has submitted (September 1975) the required safety and environmental reports to substantiate this petition. 96 refs., 17 figs., 34 tabs

  18. Development and application of the lancing system of delta-60 steam generator-Kori nuclear power plant unit 1

    International Nuclear Information System (INIS)

    Jeong, W. T.; Han, D. Y.; Ahn, N. S.; Jo, B. H.; Hong, Y. W.

    2001-01-01

    A lancing system for removing the deposits on the tube sheet of a nuclear steam generator using high pressure water was developed and applied to Kori Nuclear Power Plant( NPP) Unit 1. As the place where the lancing system is to be installed is relatively high radioactive area, every part consisting the equipment is carefully selected to be radiation resistant. The lancing robot was designed to be water proof to aviod possible malfunction of the lancing robot because of high pressure water. To minimize radiation exposure to operators, the system was designed considering easy installation and maintenance in mind. Water ejection nozzle are designed to have high strength with special material and heat treatment so as to lessen abrasion caused by high pressure ejection. The lancing system showed good performance during the on-site lancing using the system for Delta-60 steam generator of Kori NPP No. 1 in October 2000

  19. A study on determination methods of fueling machine heavy water supply setpressure for Wolsong nuclear power plant unit 1

    International Nuclear Information System (INIS)

    Kim, J. M.; Jeong, B. Y.; Baek, S. J.; Noh, T. S.; Kim, Y. H.; Park, W. K.

    2001-01-01

    The present Wolsong 1 Fuel Handling (F/H)D 2 O Supply Pressure Control System, based on an analog cascaded Proportional-Integral-Differential (PID) control, is less accurate and requires more labor for test and maintenance in comparison with up-to-data digital controllers. Furthermore, F/H operator and technical staff have recently encountered difficulties in operation and maintenance because of frequent occurrences of system instability and failure, and obsolescence of hardware. However the analysis and design review of F/H D 2 O Supply Pressure Control System have not been performed appropriately. Therefore, the design review of F/H D 2 O Supply Pressure Control System has been thoroughly reviewed and analyzed. Based on the analysis results, the optimum pressure setpoints and its determination methods have been proposed for Wolsong Nuclear Power Plant Unit 1

  20. On the development of small nuclear power stations

    International Nuclear Information System (INIS)

    Goetzmann, C.A.

    1989-01-01

    There are weighty reasons for and against the building of small nuclear power stations. Factors such as specific investment costs, opportunities for and areas of application, geographical conditions as well as those relating to infrastructure, security and availability play an important role in the planning, construction and running of a nuclear power station. For the usual large power stations, the comparatively low specific investment costs and a proven technology are favorable factors which minimize the investment risk. The article presents an overview of reasons for using small power stations and also considers the difficulties which would arise in practice. (orig.) [de

  1. Work place regulations - effects on power station construction

    International Nuclear Information System (INIS)

    Richter, E.

    1979-01-01

    The paper describes that the Workplace Order and Workplace Regulations cannot be applied in every area of a conventional power station or the conventional sections of nuclear power stations. In any case extensive regulations already exist for the hot regions of nuclear power stations. A proposal is made as to which areas of power stations should be developed in accordance with the Workplace Order and the Workplace Regulations and which areas are not deemed to be 'Workplaces'. This is illustrated with the aid of typical examples. (orig.) [de

  2. Simulation of a pressurized-water nuclear power station

    International Nuclear Information System (INIS)

    Larminaux, Robert; Ourmann, Michel

    1978-01-01

    Faced with the large programme of fitting out PWR nuclear power stations, Electricite de France have undertaken a series of studies with a view to ensuring the best possible adaptation of the secondary part -particularly the feed water heating section- to the nuclear boiler. In order to undertake such studies it has been necessary to finalize simulation models of the entire power station. So as to verify the validity of the models, experiment-calculation comparisons were made during transient operating states recorded at the Ardennes power station as well as during starting up trials at the Tihange I power station [fr

  3. Surry steam generator - examination and evaluation

    International Nuclear Information System (INIS)

    Clark, R.A.; Doctor, P.G.; Ferris, R.H.

    1985-10-01

    This report summarizes research conducted during the fourth year of the five year Steam Generator Group Project. During this period the project conducted numerous nondestructive examination (NDE) round robin inspections of the original Surry 2A steam generator. They included data acquisition/analysis and analysis-only round robins using multifrequency bobbin coil eddy current tests. In addition, the generator was nondestructively examined by alternate or advanced techniques including ultrasonics, optical fiber, profilometry and special eddy current instrumentation. The round robin interpretation data were compared. To validate the NDE results and for tube integrity testing, a selection of tubing samples, determined to be representative of the generator, was designated for removal. Initial sample removals from the generator included three sections of tube sheet, two sections of support plate and encompassed tubes, and a number of straight and U-bend tubing sections. Metallographic examination of these sections was initiated. Details of significant results are presented in the following paper. 13 figs

  4. Surry steam generator - examination and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Clark, R A; Doctor, P G; Ferris, R H

    1987-01-01

    This report summarizes research conducted during the fourth year of the five year Steam Generator Group Project. During this period the project conducted numerous nondestructive examination (NDE) round robin inspections of the original Surry 2A steam generator. They included data acquisition/analysis and analysis-only round robins using multifrequency bobbin coil eddy current tests. In addition, the generator was nondestructively examined by alternate or advanced techniques including ultrasonics, optical fiber, profilometry and special eddy current instrumentation. The round robin interpretation data were compared. To validate the NDE results and for tube integrity testing, a selection of tubing samples, determined to be representative of the generator, was designated for removal. Initial sample removals from the generator included three sections of tube sheet, two sections of support plate and encompassed tubes, and a number of straight and U-bend tubing sections. Metallographic examination of these sections was initiated. Details of significant results are presented in the following paper.

  5. Modern power station practice incorporating modern power system practice

    CERN Document Server

    Reynolds, PM

    1992-01-01

    This volume contains two additional features which enhance the value of Modern Power Station Practice as a whole: a cumulative subject index and a detailed list of tables of contents for the entire work. The cumulative index provides access to the vast body of information presented in the set, and also indicates at a glance the breadth and depth of the treatment through the use of inclusive page ranges for major topics. In order to allow the reader the greatest flexibility in using the index there are many cross-references. The entries themselves are qualified by up to two descriptive subheadi

  6. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Analysis of core damage frequency from internal fire events for Plant Operational State 5 during a refueling outage. Volume 3

    International Nuclear Information System (INIS)

    Lambright, J.; Yakle, J.

    1994-07-01

    This report, Volume 3, presents the details of the analysis of core damage frequency due to fire during shutdown Plant Operational State 5 at the Grand Gulf Nuclear Station. Insights from previous fire analyses (Peach Bottom, Surry, LaSalle) were used to the greatest extent possible in this analysis. The fire analysis was fully integrated utilizing the same event trees and fault trees that were used in the internal events analysis. In assessing shutdown risk due to fire at Grand Gulf, a detailed screening was performed which included the following elements: (a) Computer-aided vital area analysis; (b) Plant inspections; (c) Credit for automatic fire protection systems; (d) Recovery of random failures; (e) Detailed fire propagation modeling. This screening process revealed that all plant areas had a negligible (<1.0E-8 per year) contribution to fire-induced core damage frequency

  7. Locating techniques for nuclear power stations

    International Nuclear Information System (INIS)

    Hayashi, Masao

    1983-01-01

    The basic thought in locating nuclear power stations is to examine carefully the suitability of sites and the safety of plants, and in the end, to perfect the safety of public. In Japan, effort is exerted to obtain the trust of local people by carrying out investigation, research and examination from respective standpoints of the government, institutes and industries. The author has engaged in the standardization of the investigation, test and analysis regarding the aseismatic capability of ground, the verifying project in Tadotsu of the coupled vibration of ground and structures, the evaluation of the performance of large vibration tables, the future concept of new locating procedure and so on in the last more than ten years. The technological classification of ground, the technological meaning of active faults, the procedure of the aseismatic design of plants, the difference of earthquake input force according to various locating methods, 12 rules regarding the attenuation of vibration of ground, and the concept of new locating method in the 21st century are explained. As the new locating techniques applicable to central Japan, diluvial ground location, floating location in tunnels, underground location, offshore location and so on must be promoted. (Kako, I.)

  8. Safety evaluation report related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-275 and 50-323)

    International Nuclear Information System (INIS)

    1983-12-01

    Supplement 20 to the Safety Evaluation Report for Pacific Gas and Electric Company's application for licenses to operate Diablo Canyon Nuclear Power Plant, Unit 1 and Unit 2 (Docket Nos. 50-275 and 50-323), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports on the verification effort for Diablo Canyon Unit 1 that was performed between November 1981 and the present in response to Commission Order CLI-81-30 and an NRC letter of November 19, 1981 to the licensee. Specifically, Supplement 20 addresses those issues and other matters identified in Supplements 18 and 19 that must be resolved prior to Unit 1 achieving criticality and operating at power levels up to 5% of rated full power. This SER Supplement applies only to Diablo Canyon Unit 1

  9. 47 CFR 74.793 - Digital low power TV and TV translator station protection of broadcast stations.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital low power TV and TV translator station... DISTRIBUTIONAL SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.793 Digital low power TV and TV translator station protection of broadcast stations. (a) An application to construct a new digital low power...

  10. Safety evaluation report related to the operation of Shoreham Nuclear Power Station, Unit No. 1. Docket No. 50-322

    International Nuclear Information System (INIS)

    1983-02-01

    Supplement No. 3 to the Safety Evaluation Report of Long Island Lighting Company's application for a license to operate the Shoreham Nuclear Power Station, Unit 1, located in Suffolk County, New York, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement addresses several items that have come to light since the previous supplement was issued

  11. Safety evaluation report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2: Docket Nos. 50-445 and 50-446

    International Nuclear Information System (INIS)

    1988-07-01

    Supplement 15 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 (NUREG-0797), has been prepared by the Office of Special Projects of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement presents the staff's evaluation of the applicant's Corrective Action Program (CAP) related to the design of cable trays and cable tray hangers. The scope and methodologies for the CAP workscope as summarized in Revision O to the cable tray and cable tray hanger project status report and as detailed in related documents referenced in this evaluation were developed to resolve various design issues raised by the Atomic Safety and Licensing Board (ASLB) the intervenor, Citizens Association for Sound Energy (CASE); the Comanche Peak Response Team (CPRT); CYGNA Energy Services (CYGNA); and the NRC staff. The NRC staff concludes that the CAP workscope for cable trays and cable tray hangers provides a comprehensive program for resolving the associated technical concerns identified by the ASLB, CASE, CPRT, CYGNA, and the NRC staff and its implementation ensures that the design of cable trays and cable tray hangers at CPSES satisfies the applicable requirements of 10 CFR Part 50

  12. Safety evaluation report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1988-11-01

    Supplement 18 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 (NUREG-0797), has been prepared by the Office of Special Projects of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement presents the staff's evaluation of the applicant's Corrective Action Program (CAP) related to the structural design of the heating, ventilation, and air conditioning (HVAC) systems. The scope and methodologies for the CAP workscope as summarized in Revision 0 to the HVAC project status report and as detailed in related documents referenced in this evaluation were developed to resolve the technical concerns identified in the HVAC area. The NRC staff concludes that the CAP workscope for the HVAC structural design provides a comprehensive program for resolving the associated technical concerns and its implementation ensures that the structural design of the HVAC systems at CPSES satisfies the applicable requirements of 10 CFR Part 50. 32 refs

  13. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1990-01-01

    Supplement 22 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station, Units 1 and 2 (NUREG-0797), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement reports the status of certain issues that had not been resolved at the time of publication of the Safety Evaluation Report and Supplements 1, 2, 3, 4, 6, 12, and 21 to that report. This supplement also includes the evaluations for licensing items resolved since Supplement 21 was issued. Supplement 5 has been cancelled. Supplements 7 through 11 were limited to the staff evaluation of allegations investigated by the NRC Technical Review Team. Supplement 13 presented the staff's evaluation of the Comanche Peak Response Team (CPRT) Program Plan, which was formulated by the applicant to resolve various construction and design issues raised by sources external to the applicant. Supplements 14 through 20 presented the staff's evaluation of the applicant's Corrective Action Program and CPRT activities. Items identified in Supplements 7, 8, 9, 10, 11, 13, 14, and 15 through 20 are not included in this supplement, except to the extent that they affect the applicant's Final Safety Analysis Report. 154 refs., 24 figs., 8 tabs

  14. Integrated plant safety assessment: Systematic Evaluation Program, San Onofre Nuclear Generating Station, Unit 1 (Docket No. 50-206): Final report

    International Nuclear Information System (INIS)

    1986-12-01

    The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues; (2) a basis for deciding on how these differences should be resolved in an integrated plant review; and (3) a documented evaluation of plant safety. This report documents the review of San Onofre Nuclear Generating Station, Unit 1, operated by Southern California Edison Company. The San Onofre plant is one of ten plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. This report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license. This report also addresses the comments and recommendations made by the Advisory Committee on Reactor Safeguards in connection with its review of the draft report issued in April 1985

  15. Safety evaluation report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1988-03-01

    Supplement 14 to the Safety Evaluation Report related to the operation of the Comanche Peak Stam Electric Station (CPSES), Units 1 and 2 (NUREG-0797), has been prepared by the Office of Special Projects of the US Nuclear Regulatory Commission (NRC). The facility is located in Somerville County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement presents the staff's evaluation of the applicants' Corrective Action Program (CAP0 related to large ans small bore piping and pipe supports. The scope and methodologies for CAP workshop as summarized in revision O to the large and small bore piping project status reports and as detailed in related documents referenced in this evaluation were developed to resolve various design issues raised by the Atomic Safety and Licensing Board (ASLB);the intervenor, Citizens Association for Sound Energy (CASE);the Camanche Peak Response Team (CPRT);SYGNA Energy Services (CYGNA);and the NRC staff. The NRC staff concludes that the CAP workscopes for large and small bore piping provide a comprehensive program for resolving the associated technical concerns identified by the ASLB, CASE, CPRT, CYGNA, and the NRC staff and their implementation ensures that the design of large and small bore piping and pipe supports at CPSES satisfies the applicable requirements of 10 CFR 50

  16. Safety evaluation report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2: Docket No. 50-445 and 50-446

    International Nuclear Information System (INIS)

    1988-11-01

    Supplement 20 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 (NUREG-0797), has been prepared by the Office of Special Projects of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement presents the staff's evaluation of CPRT implementation of the Comanche Peak Response Team (CPRT) Program Plan and the issue-specific action plans (ISAPs), as well as the CPRT's investigations to determine the adequacy of various types of programs and hardware at CPSES. The results and conclusions of the CPRT activities are documented in a results report for each ISAP, a Collective Evaluation Report (CER), and a Collective Significance Report (CSR). This supplement also presents the staff's safety evaluation of TU Electric's root cause assessment of past CPSES design deficiencies and weaknesses. The NRC staff concludes that the CPRT has adequately implemented its investigative activities related to the design, construction, construction quality assurance/quality control, and testing at CPSES. The NRC staff further concludes that the CPRT evaluation of the results of its investigation is thorough and complete and its recommendations for corrective actions are sufficient to resolve identified deficiencies

  17. Human reliability analysis approach to level 1 PSA - shutdown and low power operation of Mochovce NPP, Unit 1, Slovakia

    International Nuclear Information System (INIS)

    Stojka, Tibor; Holy, Jaroslav

    2003-01-01

    The paper presents general approach, used methods and form of documentation of the results as have been applied within the Human Reliability Analysis (HRA) task of the shutdown and low power PSA (SPSA) study for Mochovce nuclear power plant, Unit 1, Slovakia. The paper describes main goals of the HRA task within the SPSA project, applied methods and data sources. Basic steps of the HRA task and human errors (HE) classification are also specified in its first part. The main part of the paper deals with pre-initiator human errors, human-induced initiators and response to initiator human errors. Since the expert judgment method (SLIM) was used for the last type of human errors probability assessment, also related activities are described including preparation works (performance shaping factors (PSFs) selection, development of PSF classification tables, preparation of aid tools for interview with plant experts), qualitative analysis (sources of information and basic steps) and quantitative analysis itself (human errors classification for final quantification including criteria used for the classification, description of structure of the spreadsheet used for quantification and treatment with dependencies). The last part of the paper describes form of documentation of the final results and provides some findings. (author)

  18. Assessment on the Reactor Containment Cooling Capability of Kori Unit 1 Under LOCA Conditions with Loss of Offsite Power

    International Nuclear Information System (INIS)

    Lee, Jin Yong; Park, Jong Woon; Kim, Hyeong Taek

    2006-01-01

    The fan cooler system is designed to remove heat from containment under postulated accident conditions. During a postulated LOCA concurrent with a Loss of Offsite Power (LOOP), the Component Cooling Water (CCW) pumps that supply cooling water to the fan cooler and the fan that supplies containment air to the fan cooler will temporarily lose power. Then, the high temperature steam in the containment atmosphere will pass over the fan cooler tubing without forced cooling water flow. In that case, boiling may occur in the fan cooler tubes causing steam bubbles to form and pass into the attached CCW piping creating steam voids. Prior to the CCW pumps restart, the presence of steam and subcooled water can induce the potential for water hammer. As the CCW pumps restart, the accumulated steam condenses and the pumped water can produce a water hammer when the void closes. The hydrodynamic loads caused by such a water hammer event could challenge the integrity and the function of the fan cooler and associated CCW system. With respect to this phenomena, the United States Nuclear Regulatory Commission (USNRC) issued the Generic Letter (GL) 96-06, which requests an assessment of the possibility of boiling and water hammer in the cooling water system. The objectives of this study are to develop a analysis method for predicting the thermal hydraulic status of containment fan cooler and then to assess the containment fan cooler of Kori Unit 1 using the developed model under a LOCA with LOOP

  19. Report from investigation committee on the accident at the Fukushima Nuclear Power Stations of Tokyo Electric Power Company

    International Nuclear Information System (INIS)

    Koshizuka, Seiichi

    2012-01-01

    Government's Investigation Committee on the Accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company published its final report on July 23, 2012. Results of investigation combined final report and interim report published on December 26, 2011. The author was head of accident accuse investigation team mostly in charge of site response, prior measure and plant behavior. This article reported author related technical investigation results focusing on site response and prior measures against tsunamis of units 1-3 of Fukushima Nuclear Power Stations. Misunderstanding of working state of isolation condenser of unit 1, unsuitability of alternative water injection at manual stop of high-pressure coolant injection (HPCI) system of unit 3 and improper prior measure against tsunami and severe accident were pointed out in interim report. Improper monitoring of suppression chamber of unit 2 and again unsuitable work for HPCI system of unit 3 were reported in final report. Thorough technical investigation was more encouraged to update safety measures of nuclear power stations. (T. Tanaka)

  20. Human reliability analysis of Lingao Nuclear Power Station

    International Nuclear Information System (INIS)

    Zhang Li; Huang Shudong; Yang Hong; He Aiwu; Huang Xiangrui; Zheng Tao; Su Shengbing; Xi Haiying

    2001-01-01

    The necessity of human reliability analysis (HRA) of Lingao Nuclear Power Station are analyzed, and the method and operation procedures of HRA is briefed. One of the human factors events (HFE) is analyzed in detail and some questions of HRA are discussed. The authors present the analytical results of 61 HFEs, and make a brief introduction of HRA contribution to Lingao Nuclear Power Station