WorldWideScience

Sample records for surplus operable unit

  1. Budget Surpluses: Experiences of Other Nations and Implications for the United States

    National Research Council Canada - National Science Library

    1999-01-01

    ... should be used. While balancing the budget has been the clear and generally accepted fiscal goal for many years in the United States, there is not yet agreement on the appropriate fiscal policy during a period of budget surpluses...

  2. Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Coobs, J.H.

    1983-01-01

    This is the second of two programs that are concerned with the management of surplus facilities. The facilities in this program are those related to commercial activities, which include the three surplus experimental and test reactors [(MSRE, HRE-2, and the Low Intensity Test Reactor (LITR)] and seven experimental loops at the ORR. The program is an integral part of the Surplus Facilities Management Program, which is a national program administered for DOE by the Richland Operations Office. Very briefly reported here are routine surveillance and maintenance of surplus radioactively contaminated DOE facilities awaiting decommissioning

  3. 12 CFR 615.5330 - Minimum surplus ratios.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Minimum surplus ratios. 615.5330 Section 615.5330 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM FUNDING AND FISCAL AFFAIRS, LOAN POLICIES AND OPERATIONS, AND FUNDING OPERATIONS Surplus and Collateral Requirements § 615.5330 Minimum...

  4. Recycling and surplus chemical programs

    International Nuclear Information System (INIS)

    Harper, T.J.

    1993-05-01

    In 1988, 45 years of defense production came to a close at the US Department of Energy (DOE) Hanford Site. The mission of the Hanford Site was formally changed to environmental restoration and remediation. Westinghouse Hanford Company (WHC) is the management and operations (M ampersand O) contractor leading the cleanup. Within the framework of future Site cleanup, Hanford recycling and surplus chemical programs are making a viable contribution today to waste minimization, diversion of materials from the waste stream, and setting a standard for future operations. This paper focuses on two successful efforts: paper recycling and surplus chemical sales

  5. Racism and Surplus Repression.

    Science.gov (United States)

    Johnson, Howard

    1983-01-01

    Explores the relationship between Herbert Marcuse's theory of "surplus repression" and Freud's theory of the "unconscious" with respect to latent, hidden, covert, or subliminal aspects of racism in the United States. Argues that unconscious racism, manifested in evasion/avoidance, acting out/projection, and attempted…

  6. 50 CFR 31.1 - Determination of surplus wildlife populations.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Determination of surplus wildlife populations. 31.1 Section 31.1 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM WILDLIFE SPECIES MANAGEMENT Surplus...

  7. Requirements for the transport of surplus fissile materials in the United States

    International Nuclear Information System (INIS)

    Wilson, R.K.

    1995-01-01

    This paper discusses the requirements and issues associated with the transportation of surplus fissile materials in the United States. The paper describes the materials that will be transported, the permissible modes of transport for these materials, and the safety and security requirements for each mode of transport. The paper also identifies transportation issues associated with these requirements, including the differences in requirements corresponding to who owns the material and whether the transport is on-site or off-site. Finally, the paper provides a discussion that suggests that by adopting the spent fuel standard and stored weapon standard proposed by the National Academy of Sciences, the requirements for transportation become straightforward

  8. 75 FR 70916 - Surplus Properties; Notice

    Science.gov (United States)

    2010-11-19

    ... (Volunteer Army Ammunition Plant) USARC that was determined surplus to the United States needs in accordance... Community Redevelopment and Homeless Assistance Act of 1994, Public Law 103-421 and 10 U.S.C. 113. Dated...

  9. Surplus Cost Potential as a Life Cycle Impact Indicator for Metal Extraction

    Directory of Open Access Journals (Sweden)

    Marisa D.M. Vieira

    2016-01-01

    Full Text Available In the evaluation of product life cycles, methods to assess the increase in scarcity of resources are still under development. Indicators that can express the importance of an increase in scarcity of metals extracted include surplus ore produced, surplus energy required, and surplus costs in the mining and the milling stage. Particularly the quantification of surplus costs per unit of metal extracted as an indicator is still in an early stage of development. Here, we developed a method that quantifies the surplus cost potential of mining and milling activities per unit of metal extracted, fully accounting for mine-specific differences in costs. The surplus cost potential indicator is calculated as the average cost increase resulting from all future metal extractions, as quantified via cumulative cost-tonnage relationships. We tested the calculation procedure with 12 metals and platinum-group metals as a separate group. We found that the surplus costs range six orders of magnitude between the metals included, i.e., between $0.01–$0.02 (iron and $13,533–$17,098 (rhodium USD (year 2013 per kilogram of metal extracted. The choice of the reserve estimate (reserves vs. ultimate recoverable resource influenced the surplus costs only to a limited extent, i.e., between a factor of 0.7 and 3.2 for the metals included. Our results provide a good basis to regularly include surplus cost estimates as resource scarcity indicator in life cycle assessment.

  10. 76 FR 50186 - Surplus Properties

    Science.gov (United States)

    2011-08-12

    ... have been determined surplus to the United States needs in accordance with the Defense Base Closure and... State and local governments and other eligible entities for public benefit purposes. Notices of interest from representatives of the homeless, and other interested parties located in the vicinity of any...

  11. Decommissioning of surplus facilities at ORNL

    International Nuclear Information System (INIS)

    Myrick, T.E.; Coobs, J.H.

    1985-01-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy's (DOE) National SFMP, administered by the Richland Operations Office. This program was established to provide for the management of certain DOE surplus radioactively contaminated facilities from the end of their operating life until final facility disposition is completed. As part of this program, the ORNL SFMP oversees some 75 facilities, ranging in complexity from abandoned waste storage tanks to large experimental reactors. This paper describes the scope of the ORNL program and outlines the decommissioning activities currently underway, including a brief description of the decontamination techniques being utilized. 4 refs., 3 figs., 2 tabs

  12. Hanford Surplus Facilities Program plan

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1989-09-01

    The Hanford Surplus Facilities Program is responsible for the safe and cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The management of these facilities requires a surveillance and maintenance program to keep them in a safe condition and development of a plan for ultimate disposition. Criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy-Richland Operations Office, Defense Facilities Decommissioning Program Office, and are consistent with the Westinghouse Hanford Company commitment to decommission the Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities to the end of disposition

  13. A small firm leads to curious outcomes: Social surplus, consumer surplus

    OpenAIRE

    Matsumura, Toshihiro; Matsushima, Noriaki

    2009-01-01

    This paper investigates an asymmetric duopoly model with a Hotelling line. We find that helping a small (minor) firm can reduce both social and consumer surplus. This makes a sharp contrast to existing works showing that helping minor firms can reduce social surplus but always improves consumer surplus. We also investigate R&D competition. We find that a minor firm may engage in R&D more intensively than a major firm in spite of economies of scale in R&D activities.

  14. Surplus plutonium disposition draft environmental impact statement. Summary

    International Nuclear Information System (INIS)

    1998-07-01

    On May 22, 1997, DOE published a Notice of Intent (NOI) in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS). DOE's disposition strategy allows for both the immobilization of surplus plutonium and its use as mixed oxide (MOX) fuel in existing domestic, commercial reactors. The disposition of surplus plutonium would also involve disposal of the immobilized plutonium and MOX fuel (as spent nuclear fuel) in a geologic repository. The Surplus Plutonium Disposition Environmental Impact Statement analyzes alternatives that would use the immobilization approach (for some of the surplus plutonium) and the MOX fuel approach (for some of the surplus plutonium); alternatives that would immobilize all of the surplus plutonium; and the No Action Alternative. The alternatives include three disposition facilities that would be designed so that they could collectively accomplish disposition of up to 50 metric tons (55 tons) of surplus plutonium over their operating lives: (1) the pit disassembly and conversion facility would disassemble pits (a weapons component) and convert the recovered plutonium, as well as plutonium metal from other sources, into plutonium dioxide suitable for disposition; (2) the immobilization facility would include a collocated capability for converting nonpit plutonium materials into plutonium dioxide suitable for immobilization and would be located at either Hanford or SRS. DOE has identified SRS as the preferred site for an immobilization facility; (3) the MOX fuel fabrication facility would fabricate plutonium dioxide into MOX fuel

  15. 'Nonprofits' need surplus too.

    Science.gov (United States)

    Young, D W

    1982-01-01

    By definition profit refers to the difference between revenue and expenses. In for-profit organizations profit or surplus gives a return to the owners of the company and serves as a source of financing for capital acquisitions and working capital. Nonprofit organizations, which are not allowed a surplus, don't suffer on the first count because they have no owners. But they do suffer on the second count because, if expected to grow, they need to finance asset replacement and growth. In these days when funds for long-term debt are becoming scarcer, this author asserts, the need for regulators to allow 'nonprofits' to keep a surplus is increasing. In this article, he argues for a surplus and then discusses how managers and regulators can determine how much a nonprofit organization should be allowed. He presents a combination of a modified version of the return-on-asset pricing model used in for-profit organizations and a model for assessing working capital needs associated with growth.

  16. Surplus electricity production in sugarcane mills using residual bagasse and straw as fuel

    International Nuclear Information System (INIS)

    Alves, Moises; Ponce, Gustavo H.S.F.; Silva, Maria Aparecida; Ensinas, Adriano V.

    2015-01-01

    The cogeneration system is one of the most important parts of sugarcane mills which use the bagasse as fuel. In the recent years, modern equipments and energy efficiency measures made possible to the sugarcane industry, the production of surplus electricity which become, besides the sugar and ethanol, a third product from the same renewable source, the sugarcane. This work analyses the surplus electric power systems for three different schemes of cogeneration system in the sugarcane industry through the simulator Thermoflow"®. The analysis is made considering both the available bagasse and sugarcane straw recovery as fuel in three different scenarios for the industrial process energy requirements. The results show that the CEST (Condensing Extraction Steam Turbine) system can have a surplus of electricity of up to four times higher than the BPST (Backpressure Steam Turbine) system. The system CEST can have an increase in surplus power above 23% and 102% for the rate of 10% and 50% of cane straw recovery in the field respectively. The BPST-C (Backpressure and Condensing Turbines) system can produce similar values of surplus electricity when compared with the system CEST, but may represent an opportunity of flexible operation of the cogeneration systems in harvest and off-seasons. - Highlights: • At least three cogeneration system options are available in sugarcane mills. • Nowadays, only steam-based cycle cogeneration systems are used in sugarcane mills. • BPST system is limited to 70 e kWh/t cane of surplus electricity production. • CEST system increases the surplus electricity up to four times than the BPST. • Operation during off-season of the BPST-C system is an advantage for this option.

  17. 41 CFR 102-37.380 - What is the statutory authority for donations of surplus Federal property made under this subpart?

    Science.gov (United States)

    2010-07-01

    ...: (a) Section 549(d) of title 40, United States Code authorizes surplus property under the control of... or SEAs). (b) Section 549(c)(3) of title 40, United States Code authorizes SASPs to donate surplus... centers. (6) Providers of assistance to homeless individuals. (7) Providers of assistance to impoverished...

  18. Surplus plutonium disposition draft environmental impact statement. Volume 2

    International Nuclear Information System (INIS)

    1998-07-01

    On May 22, 1997, DOE published a Notice of Intent (NOI) in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS). DOE's disposition strategy allows for both the immobilization of surplus plutonium and its use as mixed oxide (MOX) fuel in existing domestic, commercial reactors. The disposition of surplus plutonium would also involve disposal of the immobilized plutonium and MOX fuel (as spent nuclear fuel) in a geologic repository. The Surplus Plutonium Disposition Environmental Impact Statement analyzes alternatives that would use the immobilization approach (for some of the surplus plutonium) and the MOX fuel approach (for some of the surplus plutonium); alternatives that would immobilize all of the surplus plutonium; and the No Action Alternative. The alternatives include three disposition facilities that would be designed so that they could collectively accomplish disposition of up to 50 metric tons (55 tons) of surplus plutonium over their operating lives: (1) the pit disassembly and conversion facility would disassemble pits (a weapons component) and convert the recovered plutonium, as well as plutonium metal from other sources, into plutonium dioxide suitable for disposition; (2) the immobilization facility would include a collocated capability for converting nonpit plutonium materials into plutonium dioxide suitable for immobilization and would be located at either Hanford or SRS. DOE has identified SRS as the preferred site for an immobilization facility; (3) the MOX fuel fabrication facility would fabricate plutonium dioxide into MOX fuel. Volume 2 contains the appendices to the report and describe the following: Federal Register notices; contractor nondisclosure statement; adjunct melter

  19. Surplus plutonium disposition draft environmental impact statement. Volume 1, Part A

    International Nuclear Information System (INIS)

    1998-07-01

    On May 22, 1997, DOE published a Notice of Intent (NOI) in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS). DOE's disposition strategy allows for both the immobilization of surplus plutonium and its use as mixed oxide (MOX) fuel in existing domestic, commercial reactors. The disposition of surplus plutonium would also involve disposal of the immobilized plutonium and MOX fuel (as spent nuclear fuel) in a geologic repository. The Surplus Plutonium Disposition Environmental Impact Statement analyzes alternatives that would use the immobilization approach (for some of the surplus plutonium) and the MOX fuel approach (for some of the surplus plutonium); alternatives that would immobilize all of the surplus plutonium; and the No Action Alternative. The alternatives include three disposition facilities that would be designed so that they could collectively accomplish disposition of up to 50 metric tons (55 tons) of surplus plutonium over their operating lives: (1) the pit disassembly and conversion facility would disassemble pits (a weapons component) and convert the recovered plutonium, as well as plutonium metal from other sources, into plutonium dioxide suitable for disposition; (2) the immobilization facility would include a collocated capability for converting nonpit plutonium materials into plutonium dioxide suitable for immobilization and would be located at either Hanford or SRS. DOE has identified SRS as the preferred site for an immobilization facility; (3) the MOX fuel fabrication facility would fabricate plutonium dioxide into MOX fuel. This volume includes background information; purpose of and need for the proposed action; alternatives for disposition of surplus weapons useable plutonium; and

  20. The (Surplus) Value of Scientific Communication

    OpenAIRE

    Fröhlich, Gerhard

    1996-01-01

    In research on scientific communication there are above all theory-less and formal/natural scientific models of scientific communication. These are juxtaposed to social-scientific, power-sensitive models (Elias, Bourdieu, Merton). The (surplus) value of scientific communication can be variously understood: either as inherent surplus values in the sense of potential effects of stimulation, synergy, critique, quality control; or as symbolic surplus value in the sense of symbolic capital (Bourdi...

  1. Social surplus approach and heterodox economics

    OpenAIRE

    Lee, Frederic; Jo, Tae-Hee

    2010-01-01

    Given the emphasis on social provisioning in heterodox economics, two of its central theoretical organizing principles are the concepts of the total social product and the social surplus. This appears to link heterodox economics to the social surplus approach associated with the classical economists and currently with Sraffian economists. However, heterodox economics connects agency with the social surplus and the social product, which the Sraffians reject as they take the level and composit...

  2. US DOE surplus facilities management program (SFMP). International technology exchange activities

    International Nuclear Information System (INIS)

    Broderick, J.

    1986-01-01

    The Surplus Facilities Management Program is one of five remedial action programs established by the US Department of Energy (DOE) to eliminate potential hazards to the public and environment from radioactive contamination. These programs provide remedial actions at various facilities and sites previously used by the US Government in national atomic energy programs. Included are uranium ore milling sites, nuclear materials production plants, and research and development facilities. The DOE's five remedial action programs are: the Grand Junction Remedial Action Project; the Formerly Utilized Sites Remedial Action Project; the West Valley Demonstration Project; and the Surplus Facilities Management Program. The Surplus Facilities Management Program (SWMP) was established by DOE in 1978. There are presently over 300 shutdown facilities in the SFMP located at sites across the United States and in Puerto Rico. In some cases, remedial action involves decontaminating and releasing a facility for some other use. In other instances, facilities are completely demolished and removed from the site

  3. Surplus plutonium disposition draft environmental impact statement. Volume 1, Part B

    International Nuclear Information System (INIS)

    1998-07-01

    On May 22, 1997, DOE published a Notice of Intent (NOI) in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS). DOE's disposition strategy allows for both the immobilization of surplus plutonium and its use as mixed oxide (MOX) fuel in existing domestic, commercial reactors. The disposition of surplus plutonium would also involve disposal of the immobilized plutonium and MOX fuel (as spent nuclear fuel) in a geologic repository. The Surplus Plutonium Disposition Environmental Impact Statement analyzes alternatives that would use the immobilization approach (for some of the surplus plutonium) and the MOX fuel approach (for some of the surplus plutonium); alternatives that would immobilize all of the surplus plutonium; and the No Action Alternative. The alternatives include three disposition facilities that would be designed so that they could collectively accomplish disposition of up to 50 metric tons (55 tons) of surplus plutonium over their operating lives: (1) the pit disassembly and conversion facility would disassemble pits (a weapons component) and convert the recovered plutonium, as well as plutonium metal from other sources, into plutonium dioxide suitable for disposition; (2) the immobilization facility would include a collocated capability for converting nonpit plutonium materials into plutonium dioxide suitable for immobilization and would be located at either Hanford or SRS. DOE has identified SRS as the preferred site for an immobilization facility; (3) the MOX fuel fabrication facility would fabricate plutonium dioxide into MOX fuel. This volume has chapters on environmental consequences; environmental regulations, permits, and consultations; a glossary; list of preparers; distribution list

  4. Maximizing the retention level for proportional reinsurance under  -regulation of the finite time surplus process with unit-equalized interarrival time

    Directory of Open Access Journals (Sweden)

    Sukanya Somprom

    2016-07-01

    Full Text Available The research focuses on an insurance model controlled by proportional reinsurance in the finite-time surplus process with a unit-equalized time interval. We prove the existence of the maximal retention level for independent and identically distributed claim processes under α-regulation, i.e., a model where the insurance company has to manage the probability of insolvency to be at most α. In addition, we illustrate the maximal retention level for exponential claims by applying the bisection technique.

  5. Characterizing Surplus US Plutonium for Disposition - 13199

    Energy Technology Data Exchange (ETDEWEB)

    Allender, Jeffrey S. [Savannah River National Laboratory, Aiken SC 29808 (United States); Moore, Edwin N. [Moore Nuclear Energy, LLC, Savannah River Site, Aiken SC 29808 (United States)

    2013-07-01

    The United States (US) has identified 61.5 metric tons (MT) of plutonium that is permanently excess to use in nuclear weapons programs, including 47.2 MT of weapons-grade plutonium. Surplus inventories will be stored safely by the Department of Energy (DOE) and then transferred to facilities that will prepare the plutonium for permanent disposition. The Savannah River National Laboratory (SRNL) operates a Feed Characterization program for the Office of Fissile Materials Disposition (OFMD) of the National Nuclear Security Administration (NNSA) and the DOE Office of Environmental Management (DOE-EM). SRNL manages a broad program of item tracking through process history, laboratory analysis, and non-destructive assay. A combination of analytical techniques allows SRNL to predict the isotopic and chemical properties that qualify materials for disposition through the Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF). The research also defines properties that are important for other disposition paths, including disposal to the Waste Isolation Pilot Plant (WIPP) as transuranic waste (TRUW) or to high-level waste (HLW) systems. (authors)

  6. Disposal of Surplus Weapons Grade Plutonium

    International Nuclear Information System (INIS)

    Alsaed, H.; Gottlieb, P.

    2000-01-01

    The Office of Fissile Materials Disposition is responsible for disposing of inventories of surplus US weapons-usable plutonium and highly enriched uranium as well as providing, technical support for, and ultimate implementation of, efforts to obtain reciprocal disposition of surplus Russian plutonium. On January 4, 2000, the Department of Energy issued a Record of Decision to dispose of up to 50 metric tons of surplus weapons-grade plutonium using two methods. Up to 17 metric tons of surplus plutonium will be immobilized in a ceramic form, placed in cans and embedded in large canisters containing high-level vitrified waste for ultimate disposal in a geologic repository. Approximately 33 metric tons of surplus plutonium will be used to fabricate MOX fuel (mixed oxide fuel, having less than 5% plutonium-239 as the primary fissile material in a uranium-235 carrier matrix). The MOX fuel will be used to produce electricity in existing domestic commercial nuclear reactors. This paper reports the major waste-package-related, long-term disposal impacts of the two waste forms that would be used to accomplish this mission. Particular emphasis is placed on the possibility of criticality. These results are taken from a summary report published earlier this year

  7. Effect of Different Levels of Surplus Date on Performance, Egg Quality and Blood Parameters in Laying Hens

    Directory of Open Access Journals (Sweden)

    S.J Hosseini Vashan

    2011-12-01

    Full Text Available One hundred forty-four 26-wk-old white Hy-Line layers (W-36 were fed commercial diets containing 0, 1.5, 3 and 5% surplus date for three period of 28 days each to study the effects of dietary surplus date on hen performance (egg production, egg weight, egg mass, feed intake, feed conversion ratio ‘FCR’ and body weight gain and egg quality parameters (Haugh unit score, yolk colour index, yolk index, egg shape, shell weight, shell thickness and density. The yolk of eggs extracted and cholesterol content were determined on one egg of each replicate hens in each period. Blood samples were collected in non-heparin zed tubes from six hens in each treatment through brachial vein at the end of experiment. Serum was separated after 8-10 hrs and was stored at – 20 oC for subsequent analysis. Hen performance (egg production, egg mass, feed intake, FCR and weight gain and egg quality parameters (Haugh unit score, yolk colour index, yolk index, egg shape, shell weight, shell thickness and density were not significantly different among treatments (P>0.05; However in all traits, the control group had numerically lower value, except egg weight that was significantly increased with supplementation of surplus date in diet. The dietary surplus date did not significantly affect egg cholesterol, ND and IBD titre, but the serum cholesterol was significantly reduced in hens fed diets contained 5% surplus date. This study suggested that the surplus date may be used up to 5% in the diet of laying hens to reduce blood cholesterol without any significant adverse effect on performance.

  8. Beating swords into plowshares. [Surplus plutonium

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    With the end of the Cold War and the consequent dismantling of United States and Russian nuclear weapons, comes the problem of what to do with the plutonium and highly enriched uranium thus produced. This surplus fissile material could pose a national and international security hazard and recent studies have stresses the need for mutual and cooperative monitoring of fissile material stocks. Long term proposals for disposal, such as burning the plutonium in nuclear plants, vitrifying it into high-level waste glass logs and burying it in deep boreholes in the Earth's surface are all considered with respect to safety and economic viability. (UK).

  9. Hanford surplus facilities hazards identification document

    International Nuclear Information System (INIS)

    Egge, R.G.

    1997-01-01

    This document provides general safety information needed by personnel who enter and work in surplus facilities managed by Bechtel Hanford, Inc. The purpose of the document is to enhance access control of surplus facilities, educate personnel on the potential hazards associated with these facilities prior to entry, and ensure that safety precautions are taken while in the facility

  10. Distribution of health-related social surplus in pharmaceuticals: an estimation of consumer and producer surplus in the management of high blood lipids and COPD.

    Science.gov (United States)

    Refoios Camejo, Rodrigo; Camejo, Rodrigo Refoios; McGrath, Clare; Miraldo, Marisa; Rutten, Frans

    2014-05-01

    Following suggestions that developers should be allowed to capture a defined share of the total value generated by their technologies, the amount of surplus accruing to the pharmaceutical industry has become an important concept when discussing policies to encourage innovation in healthcare. Observational clinical and market data spanning over a period of 20 years were applied in order to estimate the social surplus generated by pharmaceuticals used in the management of high cholesterol and chronic obstructive pulmonary disease (COPD). The distribution of social surplus between consumers and producers was also computed and the dynamics of rent extraction examined. Health-related social surplus increased consistently over time for both disease areas, mostly due to the launch of more effective technologies and a greater number of patients being treated for the conditions. However, the growth rate of social surplus differed for each disease and dissimilar patterns of distribution between consumer and producer surplus emerged across the years. For lipid-lowering therapies, yearly consumer surplus reaches 85 % of total health-related social surplus after the loss of exclusivity of major molecules, whilst for COPD it ranges from 54 to 69 %. Average producer surplus is approximately 25 % of total health-related social surplus in the lipid-lowering market between 1990 and 2010, and 37 % for COPD between 2001 and 2010. The share of surplus captured by non-innovative generic producers also varies differently across periods for both markets, reaching 11.12 % in the case of lipid-lowering therapies but just 1.55 % in the case of COPD. A considerable amount of the value may be recouped by consumers only towards the end of the lifecycle. Elements affecting the distribution of social surplus vary across disease areas and include the market pricing structure and the pattern of clinical effectiveness observed over time. The application of a longer-term disease specific perspective

  11. Savannah River Site Surplus Facilities Available for Reuse

    International Nuclear Information System (INIS)

    Clarke, R.M.; Owens, M.B.; Lentz, D.W.

    1995-01-01

    The purpose of this document is to provide a current, centralized list of Savannah River Site facilities, which are surplus and available for reuse. These surplus facilities may be made available for other DOE site missions, commercial economic development reuse, or other governmental reuse. SRS procedures also require that before new construction can be approved, available surplus facilities are screened for possible reuse in lieu of the proposed new construction

  12. Reducing food waste through direct surplus food redistribution : the Norwegian case

    OpenAIRE

    Capodistrias, Paula

    2015-01-01

    Food waste is a global problem with significant economic and environmental consequences. Food waste management approaches include production of biogas, animal feed and compost and surplus food redistribution. From a sustainability point of view, surplus food redistribution is the most favorable approach. Surplus food redistribution can be either direct (between suppliers of surplus food and charity food services) or indirect (Through Food banks). This paper is a case study on direct surplus f...

  13. Heterodox surplus approach: production, prices, and value theory

    OpenAIRE

    Lee, Frederic

    2011-01-01

    In this paper I argue that that there is a heterodox social surplus approach that has its own account of output-employment and prices, and its own value theory which draws upon various heterodox traditions. Starting with the Sraffian technical definition of the social surplus and then working with a Sraffa-Leontief input-output framework, the particular distinguishing feature of the heterodox approach is the role of agency in determining prices, the social surplus, and total social product a...

  14. Residual load, renewable surplus generation and storage requirements in Germany

    International Nuclear Information System (INIS)

    Schill, Wolf-Peter

    2014-01-01

    I examine the effects of increasing amounts of fluctuating renewable energy on residual load, which is defined as the difference between actual power demand and the feed-in of non-dispatchable and inflexible generators. I draw on policy-relevant scenarios for Germany and make use of extensive sensitivity analyses. Whereas yearly renewable surplus energy is low in most scenarios analyzed, peak surplus power can become very high. Decreasing thermal must-run requirements and increasing biomass flexibility substantially reduce surpluses. I use an optimization model to determine the storage capacities required for taking up renewable surpluses. Allowing curtailment of 1% of the yearly feed-in of non-dispatchable renewables would render storage investments largely obsolete until 2032 under the assumption of a flexible power system. Further restrictions of curtailment as well as lower system flexibility strongly increase storage requirements. By 2050, at least 10 GW of storage are required for surplus integration, of which a sizeable share is seasonal storage. Results suggest that policy makers should work toward avoiding surplus generation, in particular by decreasing the must-run of thermal generators. Concerns about surpluses should not be regarded as an obstacle to further renewable expansion. The findings are also relevant for other countries that shift toward fluctuating renewables. - Highlights: • I examine the effects of fluctuating renewable energy on residual load. • Surplus energies are generally low, but there are high surplus power peaks. • Increasing the flexibility of thermal generators substantially reduces surpluses. • Allowing curtailment of 1% renders storage investments largely obsolete by 2032. • Both storage requirements and the share of seasonal storage increase by 2050

  15. Surplus plutonium disposition environmental impact statement. Public scoping meeting: Comment summary report

    International Nuclear Information System (INIS)

    1997-09-01

    The Department of Energy (DOE) issued a Record of Decision for the Storage and Disposition of Weapons-Usable Fissile Materials Programmatic Environmental Impact Statement (S ampersand D PEIS) (DOE/EIS-0229) on January 14, 1997. In that Record of Decision, DOE stated its decision to pursue a strategy for plutonium disposition that allows for immobilization of surplus weapons plutonium in glass or ceramic forms and irradiating the surplus plutonium as mixed oxide (MOX) fuel in existing reactors, while reserving the option to immobilize all the surplus weapons plutonium. The Department also decided that the extent to which either or both of these disposition approaches would ultimately be deployed would depend in part upon future National Environmental Policy Act (NEPA) review for surplus weapons plutonium disposition. On May 22, 1997, DOE published in the Federal Register (62 FR 28013) a Notice of Intent to prepare an environmental impact statement (tiered from the S ampersand D PEIS) on the disposition of United States' surplus weapons-usable plutonium. The purpose of the Notice of Intent was to describe DOE's proposed action, to solicit public input, and to announce the schedule for the public scoping meetings. During the public scoping period (May 22 - July 22, 1997), the public was invited to submit written comments by U.S. mail, fax, or through the Office of Fissile Materials Disposition's Website, as well as to provide oral comments by voicemail or by participating in public scoping meetings. Written and oral comments on the scope of the SPD EIS that were submitted during the formal comment period have been uniquely identified and have become part of the official record. This is the case whether the comments were submitted via U.S. mail, fax, website, toll-free telephone number, or through participation at a public scoping meeting

  16. 50 CFR 30.1 - Surplus range animals.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Surplus range animals. 30.1 Section 30.1... NATIONAL WILDLIFE REFUGE SYSTEM RANGE AND FERAL ANIMAL MANAGEMENT Range Animals § 30.1 Surplus range animals. Range animals on fenced wildlife refuge areas, including buffalo and longhorn cattle, determined...

  17. The social surplus of broadband initiatives in compulsory education

    Directory of Open Access Journals (Sweden)

    David Peter Parsons

    2016-10-01

    Full Text Available In 2010, the New Zealand government embarked upon an ambitious programme of broadband infrastructure investment, a process that will continue until at least 2019. Part of this investment is specifically targeted at compulsory education, with initiatives that include bringing fibre connections to the school gate, supporting on-site network upgrades (including wireless and providing teaching, learning and support services delivered through these networks. Such investments are not made without some projections of the likely rate of return, but calculating return on investment (ROI in educational broadband is complex, as it encompasses a range of factors. This article reports on an interview-based study engaging a range of stakeholders in educational broadband provision. The study utilises a research model that considers the various elements of social surplus, namely; producer surplus (savings, producer surplus (profit and consumer surplus (perceived value over and above cost, to explore the elements of social surplus that have been used to define educational broadband ROI calculations and justify the scale of investment. The results indicate that all three components of social surplus are relevant, though the concept of profit can only be seen in the broader context of long term contributions to the economy. A note of caution is that projections of ROI based only on positive returns fail to acknowledge the potential for some innovations to actually increase costs. Further, purely quantitative models do not properly take into account qualitative components of consumer surplus.

  18. Hanford surplus facilities hazards identification document. Revision 2

    International Nuclear Information System (INIS)

    Egge, R.G.

    1996-02-01

    This document provides general safety information needed by personnel who enter and work in surplus facilities managed by Bechtel Hanford, Inc. (BHI). The purpose of the document is to enhance access control of surplus facilities, educate personnel on the potential hazards associated with these facilities prior to entry, and ensure that safety precautions are taken while in the facility. Questions concerning the currency of this information should be directed to the building administrator (as listed in BHI-FS-01, Field Support Administration, Section 1.1, ''Access Control for ERC Surplus Facilities'')

  19. The assessment of labour surplus in agricultural farms

    Directory of Open Access Journals (Sweden)

    Adam Marcysiak

    2009-01-01

    Full Text Available Polish agriculture is characterised by high labour surplus in agricultural farms. The aim of the study is showing the methods used for assessment of labour surplus in agricultural farms. The assessment was made considering two criteria: objective and subjective.

  20. 76 FR 81005 - Determination of Trade Surplus in Certain Sugar and Syrup Goods and Sugar-Containing Products of...

    Science.gov (United States)

    2011-12-27

    ... Nicaragua, and (iv) the United States--Peru Trade Promotion Agreement (Peru TPA), in the case of Peru. DATES... authority, the Office des Changes. Based on this data, USTR determines that Morocco's trade surplus is... 2012). Peru: Pursuant to section 201 of the United States--Peru Trade Promotion Agreement...

  1. The class analysis of poverty: is the underclass living off the socially available surplus?

    Science.gov (United States)

    Chernomas, R; Sepehri, A

    1997-01-01

    In a recent article Erik Olin Wright argues that the U.S. underclass is a drain on the socially available surplus and thus a hindrance to capital accumulation. Wright's argument is not supported by available evidence from the United States, Canada, and the United Kingdom on the state's distributive activities. This evidence suggests that the social welfare necessary to sustain the underclass is provided by transfers from wage and salary earners rather than from profit.

  2. 75 FR 77042 - Determination of Trade Surplus in Certain Sugar and Syrup Goods and Sugar Containing Products of...

    Science.gov (United States)

    2010-12-10

    ...) the United States--Peru Trade Promotion Agreement (Peru TPA), in the case of Peru. DATES: Effective... authority, the Office des Changes. Based on this data, USTR determines that Morocco's trade surplus is... United States--Peru Trade Promotion Agreement Implementation Act (Pub. L. 110-138; 19 U.S.C. 3805 note...

  3. ANL-W MOX fuel lead assemblies data report for the surplus plutonium disposition environmental impact statement

    International Nuclear Information System (INIS)

    O'Connor, D.G.; Fisher, S.E.; Holdaway, R.

    1997-08-01

    The purpose of this document is to support the US Department of Energy (DOE) Fissile Materials Disposition Program's preparation of the draft surplus plutonium disposition environmental impact statement (EIS). This is one of several responses to data call requests for background information on activities associated with the operation of the lead assembly (LA) mixed-oxide (MOX) fuel fabrication facility. The DOE Office of fissile Materials Disposition (DOE-MD) has developed a dual-path strategy for disposition of surplus weapons-grade plutonium. One of the paths is to disposition surplus plutonium through irradiation of MOX fuel in commercial nuclear reactors. MOX fuel consists of plutonium and uranium oxides (PuO 2 and UO 2 ), typically containing 95% or more UO 2 . DOE-MD requested that the DOE Site Operations Offices nominate DOE sites that meet established minimum requirements that could produce MOX LAs. The paper describes the following: Site map and the LA facility; process descriptions; resource needs; employment requirements; wastes, emissions, and exposures; accident analysis; transportation; qualitative decontamination and decommissioning; post-irradiation examination; LA fuel bundle fabrication; LA EIS data report assumptions; and LA EIS data report supplement

  4. ANL-W MOX fuel lead assemblies data report for the surplus plutonium disposition environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    O`Connor, D.G.; Fisher, S.E.; Holdaway, R. [and others

    1997-08-01

    The purpose of this document is to support the US Department of Energy (DOE) Fissile Materials Disposition Program`s preparation of the draft surplus plutonium disposition environmental impact statement (EIS). This is one of several responses to data call requests for background information on activities associated with the operation of the lead assembly (LA) mixed-oxide (MOX) fuel fabrication facility. The DOE Office of fissile Materials Disposition (DOE-MD) has developed a dual-path strategy for disposition of surplus weapons-grade plutonium. One of the paths is to disposition surplus plutonium through irradiation of MOX fuel in commercial nuclear reactors. MOX fuel consists of plutonium and uranium oxides (PuO{sub 2} and UO{sub 2}), typically containing 95% or more UO{sub 2}. DOE-MD requested that the DOE Site Operations Offices nominate DOE sites that meet established minimum requirements that could produce MOX LAs. The paper describes the following: Site map and the LA facility; process descriptions; resource needs; employment requirements; wastes, emissions, and exposures; accident analysis; transportation; qualitative decontamination and decommissioning; post-irradiation examination; LA fuel bundle fabrication; LA EIS data report assumptions; and LA EIS data report supplement.

  5. Habit formation, surplus consumption and return predictability

    DEFF Research Database (Denmark)

    Engsted, Tom; Hyde, Stuart; Vinther Møller, Stig

    2010-01-01

    On an international post World War II dataset, we use an iterated GMM procedure to estimate and test the Campbell and Cochrane (1999, By force of habit: a consumption-based explanation of aggregate stock market behavior. Journal of Political Economy 107, 205–251.) habit formation model with a time......-varying risk-free rate. In addition, we analyze the predictive power of the surplus consumption ratio for future stock and bond returns. We find that, although there are important cross-country differences and economically significant pricing errors, for the majority of countries in our sample the model gets...... significant information about future stock returns, also during the 1990s. In addition, in most countries the surplus consumption ratio is also a powerful predictor of future bond returns. Thus, the surplus consumption ratio captures time-varying expected returns in both stock and bond markets....

  6. 78 FR 77108 - Surplus Property Notice at a Military Installation Designated for Disposal: Pueblo Chemical Depot...

    Science.gov (United States)

    2013-12-20

    ... United States needs in accordance with the Defense Authorization Amendments and Base Closure and... authorities, this surplus property may be available for conveyance to State and local governments and other eligible entities for public benefit purposes. Notices of interest from representatives of the homeless...

  7. THE CLOWER CONSTRAINTS MODEL DARI SURPLUS ATAU DEFISIT FISKAL PEMERINTAH

    Directory of Open Access Journals (Sweden)

    Jonni Manurung

    2006-01-01

    Full Text Available This study has something as a purpose to building the empirical models and the new hypothesis between the broad money, surpluses or fiscal deficit, the general price index or inflation rate, demand for monetary base and demand for bank deposit. This study also head for optimal interest rate for bank deposit at the given value of broad money, surplus or fiscal deficit, general price index, demand for monetary base, and demand for bank deposit. The model build consist to balance central bank, intertemporal budget constraint at the maximum expected utility for hold monetary base and bank deposit. The evaluation of the surplus or fiscal deficit stabilization is with the alteration of the requirement reserve ratio, Gross Domestic Product, general price index and interest rate. The results of the study show that the requirement reserve ratio, Gross Domestic Product, general price index and interest rate is very respect to surplus or deficit fiscal. The contribution requirement reserve ratio and interest rate for surplus or deficit fiscal are relatively high. This results show that the clower constraint model can explain the necessary of fiscal and monetary coordinate. Fiscal policy still weak and cause the real business cycle slow down, high inflation and interest rate. The other hands, monetary policy is very strong and cause fiscal surplus is relatively high. The prudent of government and monetary authority are needed to build the fiscal and monetary policy for create the dynamic economy, lower inflation, requirement reserve ratio and interest rate, and the monetary and fiscal dynamic equilibrium. Abstract in Bahasa Indonesia : Studi ini bertujuan membuat model empiris dan hipotesis baru tentang faktor-faktor broad money, surplus dan defisit fiskal, tingkat bunga secara umum, atau tingkat inflasi, permintaan uang primer dan deposito. Selain itu studi ini juga mencari tingkat suku bunga deposito optimal pada nilai tertentu dari faktor-faktor tersebut

  8. Understanding and overcoming the “positive profits with negative surplus-value” paradox

    Directory of Open Access Journals (Sweden)

    GUSTAVO DAOU LUCAS

    Full Text Available ABSTRACT This paper explains the “positive profits with negative surplus-value” example of Steedman (1975 and shows that while in joint production systems individual labour values can be negative, the claim that the total labour embodied in the surplus product of the economy (surplus-value can also be negative is based on assumptions that have no economic meaning (such as negative activity levels.The paper also provides a way to measure the surplus-value of joint production systems which overcomes the problems of the traditional concept and restates the proposition that a positive amount of surplus labour is a necessary condition for positive profits.

  9. Addiction surplus: the add-on margin that makes addictive consumptions difficult to contain.

    Science.gov (United States)

    Adams, Peter J; Livingstone, Charles

    2015-01-01

    Addictive consumptions generate financial surpluses over-and-above non-addictive consumptions because of the excessive consumption of addicted consumers. This add-on margin or 'addiction surplus' provides a powerful incentive for beneficiaries to protect their income by ensuring addicted consumers keep consuming. Not only that, addiction surplus provides the financial base that enables producers to sponsor activities which aim to prevent public health initiatives from reducing consumption. This paper examines the potency of addiction surplus to engage industry, governments and communities in an on-going reliance on addiction surplus. It then explores how neo-liberal constructions of a rational consumer disguise the ethical and exploitative dynamics of addiction surplus by examining ways in which addictive consumptions fail to conform to notions of autonomy and rationality. Four measures are identified to contain the distorting effects of addiction surplus. Copyright © 2014 Elsevier B.V. All rights reserved.

  10. 50 CFR 30.2 - Disposition of surplus range animals.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Disposition of surplus range animals. 30.2... (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM RANGE AND FERAL ANIMAL MANAGEMENT Range Animals § 30.2 Disposition of surplus range animals. Disposition shall be made only during regularly scheduled disposal...

  11. A stochastic surplus production model in continuous time

    DEFF Research Database (Denmark)

    Pedersen, Martin Wæver; Berg, Casper Willestofte

    2017-01-01

    surplus production model in continuous time (SPiCT), which in addition to stock dynamics also models the dynamics of the fisheries. This enables error in the catch process to be reflected in the uncertainty of estimated model parameters and management quantities. Benefits of the continuous-time state......Surplus production modelling has a long history as a method for managing data-limited fish stocks. Recent advancements have cast surplus production models as state-space models that separate random variability of stock dynamics from error in observed indices of biomass. We present a stochastic......-space model formulation include the ability to provide estimates of exploitable biomass and fishing mortality at any point in time from data sampled at arbitrary and possibly irregular intervals. We show in a simulation that the ability to analyse subannual data can increase the effective sample size...

  12. 5 CFR 330.607 - Notification of surplus and displaced employees.

    Science.gov (United States)

    2010-01-01

    ... employees. 330.607 Section 330.607 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS RECRUITMENT, SELECTION, AND PLACEMENT (GENERAL) Agency Career Transition Assistance Plans (CTAP) for Local Surplus and Displaced Employees § 330.607 Notification of surplus and displaced employees...

  13. The UK's Surplus Source Disposal Programme: successful management of a national radioactive legacy

    International Nuclear Information System (INIS)

    Williams, Clive; Burns, Philip; Wakerley, Malcolm; Watson, Isabelle; Cook, Marianne; Moloney, Barry

    2010-01-01

    Between 2004 and 2009, the Surplus Source Disposal Programme (SSDP) arranged and subsidised the safe disposal or recycling of more than 11 000 unwanted radioactive items containing in total more than 8.5 x 10 14 Bq of activity, from some 500 sites throughout the United Kingdom. Sources were removed principally from universities, schools and colleges, museums, and hospitals. SSDP was funded by the UK Government and managed by the Environment Agency. The programme was delivered at a total cost of Pounds 7.14 million, nearly Pounds 2 million less than its initial budget. This was a big success for health and safety, the environment, business and the public purse. Current legislative requirements under the High Activity Sealed Sources Directive, which came into effect during 2005, will prevent a build-up of high activity surplus sources in future. Continuing vigilance may be needed to avoid a build-up of lower activity disused sources. (note)

  14. Surplus men, sex work, and the spread of HIV in China.

    Science.gov (United States)

    Tucker, Joseph D; Henderson, Gail E; Wang, Tian F; Huang, Ying Y; Parish, William; Pan, Sui M; Chen, Xiang S; Cohen, Myron S

    2005-03-24

    While 70% of HIV positive individuals live in sub-Saharan Africa, it is widely believed that the future of the epidemic depends on the magnitude of HIV spread in India and China, the world's most populous countries. China's 1.3 billion people are in the midst of significant social transformation, which will impact future sexual disease transmission. Soon approximately 8.5 million 'surplus men', unmarried and disproportionately poor and migrant, will come of age in China's cities and rural areas. Meanwhile, many millions of Chinese sex workers appear to represent a broad range of prices, places, and related HIV risk behaviors. Using demographic and behavioral data, this paper describes the combined effect of sexual practices, sex work, and a true male surplus on HIV transmission. Alongside a rapid increase in sexually transmitted disease incidence across developed parts of urban China, surplus men could become a significant new HIV risk group. The anticipated high sexual risk among many surplus men and injecting drug use use among a subgroup of surplus men may create bridging populations from high to low risk individuals. Prevention strategies that emphasize traditional measures--condom promotion, sex education, medical training--must be reinforced by strategies which acknowledge surplus men and sex workers. Reform within female sex worker mandatory re-education centers and site specific interventions at construction sites, military areas, or unemployment centers may hold promise in curbing HIV/sexually transmitted infections. From a sociological perspective, we believe that surplus men and sex workers will have a profound effect on the future of HIV spread in China and on the success or failure of future interventions.

  15. Consumer surplus and CES demand

    NARCIS (Netherlands)

    ten Raa, Thijs

    2015-01-01

    This article presents the consumer surplus formula for constant elasticity of substitution (CES) demands. The formula is used to compare the monopoly and optimum provisions of product variety. It is shown that a monopolist under-provides variety. This result is contrasted with Lambertini’s analysis

  16. 7 CFR 987.47 - Surplus.

    Science.gov (United States)

    2010-01-01

    ... of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and... that any producer or handler may dispose of any such surplus dates of his own production within his own... regulations necessary and incidental to administration of this regulation. [27 FR 6818, July 19, 1962, as...

  17. Investment and protection of the OAPEC surplus: a strategy

    Energy Technology Data Exchange (ETDEWEB)

    Nuwayhid, H.S.

    1981-02-01

    The Arab countries could not absorb the surplus dollars when oil prices rose in the 1970s, nor were they prepared to move into Western financial markets without causing disruptions. A strategy for protecting these surpluses takes into account market realities and the responsibilities of Arab oil-exporting countries toward the Third World. The Organization of Arab Petroleum Exporting Countries (OAPEC) strategy mainly applies to those countries that cannot absorb their surpluses for internal development. Emphasizing asset protection rather than investment, the strategy suggests a new oil-pricing method, and a shift toward real assets, especially those in the Arab and Third World. Success will require help from the rest of the world to reform the International Monetary System, east stagflation, and recycle petrodollars. 6 references, 2 tables. (DCK)

  18. Feasibility Study on UAV-assisted Construction Surplus Soil Tracking Control and Management Technique

    Science.gov (United States)

    Jieh Haur, Chen; Kuo, Lin Sheng; Fu, Chen Ping; Li Hsu, Yeh; Da Heng, Chen

    2018-01-01

    Construction surplus soil tracking management has been the key management issue in Taiwan since 1991. This is mainly due to the construction surplus soils were often regarded as disposable waste and were disposed openly without any supervision, leading to environmental pollution. Even though the surplus soils were gradually being viewed as reusable resources, some unscrupulous enterprises still dump them freely for their own convenience. In order to dispose these surplus soils, site offices are required to confirm with the soil treatment plant regarding the approximate soil volume for hauling vehicle dispatch. However, the excavated soil volume will transform from bank volume to loose volume upon excavation, which may differ by a certain speculative coefficient (1.3), depending on the excavation site and geological condition. For managing and tracking the construction surplus soils, local government authorities frequently performed on-site spot check, but the lack of rapid assessment tools for soil volume estimation increased the evaluation difficulty for on-site inspectors. This study adopted unmanned aerial vehicle (UAV) in construction surplus soil tracking and rapidly acquired site photography and point cloud data, the excavated soil volume can be determined promptly after post-processing and interpretation, providing references to future surplus soil tracking management.

  19. Immobilization as a route to surplus fissile materials disposition. Revision 1

    International Nuclear Information System (INIS)

    Gray, L.W.; Kan, T.; McKibben, J.M.

    1996-01-01

    The safe management of surplus weapons plutonium is a very important and urgent task with profound environmental, national and international security implications. In the aftermath of the Cold War, Presidential Police Directive 13 and various analysis by renown scientific, technical and international policy organizations have brought about a focused effort within the Department of Energy to identify and implement paths forward for the long term disposition of surplus weapons usable plutonium. The central, overarching goal is to render surplus weapons plutonium as inaccessible and unattractive for reuse in nuclear weapons, as the much larger and growing stock of plutonium contained in civilian spent reactor fuel. One disposition alternative considered for surplus Pu is immobilization, in which plutonium would be emplaced in glass, ceramic or glass-bonded zeolite. This option, along with some of the progress over the last year is discussed

  20. Social Security's Surpluses: An Update.

    Science.gov (United States)

    Dattalo, Patrick

    1992-01-01

    Notes that deliberation over how to manage social security's large trust fund balances is expected to continue. Urges social workers to participate in this debate because surpluses have implications for increasing quality of life of low- and moderate-income families. Continues earlier discussion (Dattalo, 1990) by assessing two recent proposals…

  1. Surplus yeast tank failing catastrophically

    DEFF Research Database (Denmark)

    Hedlund, Frank Huess

    2016-01-01

    GOOD REASON FOR CAUTION I A large surplus yeast tank shot into the air leaving the floor plate and the contents behind. Although not designed for overpressure, the tank was kept at “very slight overpressure” to suppress nuisance foaming. The brewery was unaware of the hazards of compressed air...

  2. 41 CFR 102-37.40 - What type of surplus property is available for donation?

    Science.gov (United States)

    2010-07-01

    ... property is available for donation? 102-37.40 Section 102-37.40 Public Contracts and Property Management... 37-DONATION OF SURPLUS PERSONAL PROPERTY General Provisions Donation Overview § 102-37.40 What type of surplus property is available for donation? All surplus property (including property held by...

  3. Organization of Control Units with Operational Addressing

    OpenAIRE

    Alexander A. Barkalov; Roman M. Babakov; Larysa A. Titarenko

    2012-01-01

    The using of operational addressing unit as the block of control unit is proposed. The new structure model of Moore finite-state machine with reduced hardware amount is developed. The generalized structure of operational addressing unit is suggested. An example of synthesis process for Moore finite-state machine with operational addressing unit is given. The analytical researches of proposed structure of control unit are executed.

  4. Management of surplus electricity-production from a fluctuating renewable-energy source

    DEFF Research Database (Denmark)

    Lund, Henrik; Münster, E.

    2003-01-01

    The paper discusses and analyses different national strategies for solving a surplus production problem in Denmark, caused by electricity production from turbines and CHP.......The paper discusses and analyses different national strategies for solving a surplus production problem in Denmark, caused by electricity production from turbines and CHP....

  5. Disposition of surplus highly enriched uranium: Draft environmental impact statement

    International Nuclear Information System (INIS)

    1995-10-01

    This document assesses the environmental impacts at four potential sites that may result from alternatives for the disposition of United States-origin weapons-usable highly enriched uranium (HEU) that has been or may be declared surplus to national defense or defense-related program needs. In addition to the no action alternative, it assesses four alternatives that would eliminate the weapons-usability of HEU by blending it with depleted uranium, natural uranium, or low-enriched uranium (LEU) to create low-enriched uranium, either as commercial reactor fuel feedstock or as low-level radioactive waste. The potential blending sites are DOE's Y-12 Plant at Oak Ridge Reservation in Oak Ridge, Tennessee; DOE's Savannah River Site in Aiken, South Carolina; the Babcock ampersand Wilcox Naval Nuclear Fuel Division Facility in Lynchburg, Virginia; and the Nuclear Fuel Services Fuel Fabrication Plant in Erwin, Tennessee. Evaluations of impacts on site infrastructure, water resources, air quality and noise, socioeconomic resources, waste management, public and occupational health, and environmental justice for the potential blending sites are included in the assessment. The intersite transportation of nuclear and hazardous materials is also assessed. The preferred alternative is to blend down surplus HEU to LEU for maximum commercial use as reactor fuel feed which would likely be done at a combination of DOE and commercial sites

  6. Nutrient surpluses on integrated arable farms

    NARCIS (Netherlands)

    Schröder, J.J.; Asperen, van P.; Dongen, van G.J.M.; Wijnands, F.G.

    1996-01-01

    From 1990 to 1993 nutrient fluxes were monitored on 38 private arable farms that had adopted farming strategies aiming at reduced nutrient inputs and substitution of mineral fertilizers by organic fertilizers. The nutrient surplus was defined as the difference between inputs (including inputs

  7. The UK's Surplus Source Disposal Programme: successful management of a national radioactive legacy

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Clive [Environment Agency, Block 1, Government Buildings, Burghill Road, Westbury-on-Trym, Bristol BS10 6BF (United Kingdom); Burns, Philip [Formerly of the Environment Agency, Olton Court, 10 Warwick Road, Solihull B92 7HX (United Kingdom); Wakerley, Malcolm [Formerly of the Department for Environment, Food and Rural Affairs, Ergon House, 17 Smith Square, London SW1P 3JR (United Kingdom); Watson, Isabelle [Scottish Environment Protection Agency, 5 Redwood Crescent, Peel Park, East Kilbride G74 5PP (United Kingdom); Cook, Marianne [Scottish Government, Victoria Quay, Edinburgh EH6 6QQ (United Kingdom); Moloney, Barry [Safeguard International (now EnergySolutions), B168, Harwell Campus, Didcot, Oxon OX11 0QT (United Kingdom)

    2010-06-15

    Between 2004 and 2009, the Surplus Source Disposal Programme (SSDP) arranged and subsidised the safe disposal or recycling of more than 11 000 unwanted radioactive items containing in total more than 8.5 x 10{sup 14} Bq of activity, from some 500 sites throughout the United Kingdom. Sources were removed principally from universities, schools and colleges, museums, and hospitals. SSDP was funded by the UK Government and managed by the Environment Agency. The programme was delivered at a total cost of Pounds 7.14 million, nearly Pounds 2 million less than its initial budget. This was a big success for health and safety, the environment, business and the public purse. Current legislative requirements under the High Activity Sealed Sources Directive, which came into effect during 2005, will prevent a build-up of high activity surplus sources in future. Continuing vigilance may be needed to avoid a build-up of lower activity disused sources. (note)

  8. 41 CFR 102-37.200 - What certifications must a SASP make when requesting surplus property for donation?

    Science.gov (United States)

    2010-07-01

    ... a SASP make when requesting surplus property for donation? 102-37.200 Section 102-37.200 Public... MANAGEMENT REGULATION PERSONAL PROPERTY 37-DONATION OF SURPLUS PERSONAL PROPERTY State Agency for Surplus... requesting surplus property for donation? When requesting or applying for property, you must certify that: (a...

  9. Operable Unit Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of operable unit data from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times and...

  10. LLNL MOX fuel lead assemblies data report for the surplus plutonium disposition environmental impact statement

    International Nuclear Information System (INIS)

    O'Connor, D.G.; Fisher, S.E.; Holdaway, R.

    1998-08-01

    The purpose of this document is to support the US Department of Energy (DOE) Fissile Materials Disposition Program's preparation of the draft surplus plutonium disposition environmental impact statement. This is one of several responses to data call requests for background information on activities associated with the operation of the lead assembly (LA) mixed-oxide (MOX) fuel fabrication facility. The DOE Office of Fissile Materials Disposition (DOE-MD) has developed a dual-path strategy for disposition of surplus weapons-grade plutonium. One of the paths is to disposition surplus plutonium through irradiation of MOX fuel in commercial nuclear reactors. MOX fuel consists of plutonium and uranium oxides (PuO 2 and UO 2 ), typically containing 95% or more UO 2 . DOE-MD requested that the DOE Site Operations Offices nominate DOE sites that meet established minimum requirements that could produce MOX LAs. LLNL has proposed an LA MOX fuel fabrication approach that would be done entirely inside an S and S Category 1 area. This includes receipt and storage of PuO 2 powder, fabrication of MOX fuel pellets, assembly of fuel rods and bundles, and shipping of the packaged fuel to a commercial reactor site. Support activities will take place within a Category 1 area. Building 332 will be used to receive and store the bulk PuO 2 powder, fabricate MOX fuel pellets, and assemble fuel rods. Building 334 will be used to assemble, store, and ship fuel bundles. Only minor modifications would be required of Building 332. Uncontaminated glove boxes would need to be removed, petition walls would need to be removed, and minor modifications to the ventilation system would be required

  11. [On the temporary surplus population in the elementary stage of socialism in China].

    Science.gov (United States)

    Wang, Y; Chen, L

    1988-07-01

    The causes and patterns of China's surplus population are analyzed for the period 1951-1980. The authors view the surplus population as a temporary phenomenon that is advantageous to social development.

  12. Sensitivity of whitewater rafting consumers surplus to pecuniary travel cost specifications

    Science.gov (United States)

    Donald B.K. English; J. Michael Bowker

    1996-01-01

    Considerable research has examined how different ways of accounting for onsite and travel time affect surplus estimates from travel cost models. However, little has been done regarding different definitions of out-of-pocket costs. Estimates of per trip consumer surplus are developed for a zonal travel cost model for outfitted rafting on the Chattooga River. Nine price...

  13. Overview of surplus weapons plutonium disposition

    Energy Technology Data Exchange (ETDEWEB)

    Rudy, G.

    1996-05-01

    The safe disposition of surplus weapons useable plutonium is a very important and urgent task. While the functions of long term storage and disposition directly relate to the Department`s weapons program and the environmental management program, the focus of this effort is particularly national security and nonproliferation.

  14. Dealing with surplus emissions in the climate negotiations after Copenhagen: What are the options for compromise?

    International Nuclear Information System (INIS)

    Elzen, Michel den; Roelfsema, Mark; Slingerland, Stephan

    2010-01-01

    This paper analyses the environmental and financial consequences of various strategies of dealing with surplus emission allowances in the aftermath of the Copenhagen Accord. This topic remains relevant, in particular, with respect to the Russian negotiation position, as this country is the largest holder of surplus emissions. It is concluded that not addressing the surplus problem is not a feasible negotiation option, as the sheer size of the surpluses would jeopardise the environmental integrity of any future agreement. Cancelling surpluses against Russia's will, though viable, is not desirable, as it might well lead to this country opting out of this climate treaty. Three options for compromise have been selected and analysed here: (1) stricter targets for Annex I countries; (2) strategic reserve for Russia; (3) institutionalising optimal banking. It is concluded that, whereas option 1 is environmentally the best, in the present political context it is probably less feasible. The other two options, although environmentally suboptimal, seem politically more favourable. Our analysis suggests that maximal revenues for surplus-holding countries arise by releasing only a limited amount of surplus credits to the market. The institutionalisation of this effect could be a key lever to a politically feasible agreement on surplus emissions.

  15. 200-BP-5 operable unit treatability test report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites.

  16. 200-BP-5 operable unit treatability test report

    International Nuclear Information System (INIS)

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites

  17. Surplus from and storage of electricity generated by intermittent sources

    Science.gov (United States)

    Wagner, Friedrich

    2016-12-01

    Data from the German electricity system for the years 2010, 2012, 2013, and 2015 are used and scaled up to a 100% supply by intermittent renewable energy sources (iRES). In the average, 330GW wind and PV power are required to meet this 100% target. A back-up system is necessary with the power of 89% of peak load. Surplus electricity accrues at high power levels. Curtailing surplus power to a large extent is found to be uneconomic. Demand-side management will suffer from the strong day-to-day variation of available surplus energy. A day storage is ineffective because of the day-night correlation of surplus power during winter. A seasonal storage loses its character when transformation losses are considered because it can contribute only after periods with excessive surplus production. The option of an oversized iRES system to feed the storage is also not effective because, in this case, energy can be taken directly from the large iRES supply, making storage superfluous. The capacities to be installed stress the difficulty to base heat supply and mobility also on iRES generated electricity in the future. As the German energy transition replaces one CO2-free electricity supply system by another one, no major reduction in CO2 emission can be expected till 2022, when the last nuclear reactor will be switched off. By 2022, an extremely oversized power supply system has to be created, which can be expected to continue running down spot-market electricity prices. The continuation of the economic response -to replace expensive gas fuel by cheap lignite- causes an overall increase in CO2 emission. The German GHG emission targets for 2020 and beyond are therefore in jeopardy.

  18. Integrated Ground Operations Demonstration Units

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the AES Integrated Ground Operations Demonstration Units (IGODU) project is to demonstrate cost efficient cryogenic operations on a relevant...

  19. The SWAP SHOP: A surplus materials exchange network at DOE's Oak Ridge Reservation

    International Nuclear Information System (INIS)

    Bell, L.H.; Birch-Kennedy, S.

    1993-01-01

    The diversity and continually changing nature of the research and production programs at the ORR plant sites, as well as the size of the facilities and their physical separation on the ORR, lead to the buildup of surplus equipment and materials from canceled or completed projects, changes in work orders or directives, or over-procurement of particular items or materials. Many times, for lack of a means to find legitimate uses for these excess items, they have been disposed of as wastes or sold as salvage. Recognizing that this situation prevails at most, if not all, government facilities, Congress has enacted legislation encouraging the establishment of waste minimization, pollution prevention, and cost avoidance measures throughout government-owned facilities. In response to this, the Secretary of Energy has instituted a high-priority DOE initiative to develop, promote, and implement waste minimization and pollution prevention at government installations. One result of the increased awareness and emphasis on environmental concerns and improved resource management is the recent grassroots development of a surplus materials exchange network developed and operated on a voluntary basis by Environmental Protection Officers (EPOs) at the Oak Ridge installations. The EPOs are full-time or part-time staff members employed by each division to provide guidance and assistance for achieving compliance with all environmental regulatory requirements and to resolve waste disposal problems. The materials exchange network, called the SWAP SHOP, provides an EPO communications and problem-solving network to help eliminate unnecessary disposal of usable surplus chemicals and equipment at the Oak Ridge plant sites

  20. Application of surplus and waste materials in roads pavement making

    OpenAIRE

    Mousavi, S. M.; Fazli, A. H.; Rouzmehr, F.

    2011-01-01

    Nowadays there are a lot of problems about surpluses and debris made by humans all around the world. Lots of these surpluses seriously harm our natural environment. Reuse of this kind of materials in other processes like building constructions or pavement help our natural environment in every aspect. Asphalt concrete is the main part of pavements in most parts of the world with an increasing rate of production in need of more ways and roads. In this paper we will provide...

  1. LLNL MOX fuel lead assemblies data report for the surplus plutonium disposition environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    O`Connor, D.G.; Fisher, S.E.; Holdaway, R. [and others

    1998-08-01

    The purpose of this document is to support the US Department of Energy (DOE) Fissile Materials Disposition Program`s preparation of the draft surplus plutonium disposition environmental impact statement. This is one of several responses to data call requests for background information on activities associated with the operation of the lead assembly (LA) mixed-oxide (MOX) fuel fabrication facility. The DOE Office of Fissile Materials Disposition (DOE-MD) has developed a dual-path strategy for disposition of surplus weapons-grade plutonium. One of the paths is to disposition surplus plutonium through irradiation of MOX fuel in commercial nuclear reactors. MOX fuel consists of plutonium and uranium oxides (PuO{sub 2} and UO{sub 2}), typically containing 95% or more UO{sub 2}. DOE-MD requested that the DOE Site Operations Offices nominate DOE sites that meet established minimum requirements that could produce MOX LAs. LLNL has proposed an LA MOX fuel fabrication approach that would be done entirely inside an S and S Category 1 area. This includes receipt and storage of PuO{sub 2} powder, fabrication of MOX fuel pellets, assembly of fuel rods and bundles, and shipping of the packaged fuel to a commercial reactor site. Support activities will take place within a Category 1 area. Building 332 will be used to receive and store the bulk PuO{sub 2} powder, fabricate MOX fuel pellets, and assemble fuel rods. Building 334 will be used to assemble, store, and ship fuel bundles. Only minor modifications would be required of Building 332. Uncontaminated glove boxes would need to be removed, petition walls would need to be removed, and minor modifications to the ventilation system would be required.

  2. Physical protection of nuclear operational units

    International Nuclear Information System (INIS)

    1981-07-01

    The general principles of and basic requirements for the physical protection of operational units in the nuclear field are established. They concern the operational units whose activities are related with production, utilization, processing, reprocessing, handling, transport or storage of materials of interest for the Brazilian Nuclear Program. (I.C.R.) [pt

  3. 41 CFR 102-37.80 - What happens to surplus property that isn't transferred for donation?

    Science.gov (United States)

    2010-07-01

    ... property that isn't transferred for donation? 102-37.80 Section 102-37.80 Public Contracts and Property... PROPERTY 37-DONATION OF SURPLUS PERSONAL PROPERTY General Provisions Donation Overview § 102-37.80 What happens to surplus property that isn't transferred for donation? Surplus property not transferred for...

  4. 41 CFR 102-37.50 - What is the general process for requesting surplus property for donation?

    Science.gov (United States)

    2010-07-01

    ... process for requesting surplus property for donation? 102-37.50 Section 102-37.50 Public Contracts and... REGULATION PERSONAL PROPERTY 37-DONATION OF SURPLUS PERSONAL PROPERTY General Provisions Donation Overview § 102-37.50 What is the general process for requesting surplus property for donation? The process for...

  5. Essays on the relevance and use of dirty surplus accounting flows in Europe

    NARCIS (Netherlands)

    Wang, Y.

    2006-01-01

    This thesis intends to add empirical evidence to a recently heavily debated regulatory issue, the necessity of promoting a clean surplus income statement. I document the magnitude, and assess the relevance of dirty surplus accounting flows in European member states. In particular, this thesis

  6. 76 FR 53699 - Labor Surplus Area Classification Under Executive Orders 12073 and 10582

    Science.gov (United States)

    2011-08-29

    ... DEPARTMENT OF LABOR Employment and Training Administration Labor Surplus Area Classification Under Executive Orders 12073 and 10582 AGENCY: Employment and Training Administration, Labor. ACTION: Notice SUMMARY: The purpose of this notice is to announce the annual list of labor surplus areas for Fiscal Year...

  7. 78 FR 63248 - Labor Surplus Area Classification under Executive Orders 12073 and 10582

    Science.gov (United States)

    2013-10-23

    ... DEPARTMENT OF LABOR Employment and Training Administration Labor Surplus Area Classification under Executive Orders 12073 and 10582 AGENCY: Employment and Training Administration, Labor. ACTION: Notice. SUMMARY: The purpose of this notice is to announce the annual list of labor surplus areas for Fiscal Year...

  8. 75 FR 9955 - Labor Surplus Area Classification Under Executive Orders 12073 and 10582

    Science.gov (United States)

    2010-03-04

    ... DEPARTMENT OF LABOR Employment and Training Administration Labor Surplus Area Classification Under Executive Orders 12073 and 10582 AGENCY: Employment and Training Administration, Labor. ACTION: Notice. SUMMARY: The purpose of this notice is to update the 2010 Labor Surplus Areas annual list published in the...

  9. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    International Nuclear Information System (INIS)

    Kim, Man Cheol

    2014-01-01

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated

  10. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Man Cheol [Chungang University, Seoul (Korea, Republic of)

    2014-08-15

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated.

  11. ELIMINATION OF CLOSTRIDIUM PERFRINGENS DURING SURPLUS ACTIVATED SLUDGE HANDLING

    Directory of Open Access Journals (Sweden)

    Klaudiusz Grűbel

    2014-10-01

    Basis on the results of the research was concluded that microwave radiation (700W and 900W shows disintegration action expressed in COD value in the supernatant increase: 12 times increase value of COD with power 700W and 13 times for 900W radiation power. Electromagnetic wave contributed to partial higienisation of surplus activated sludge. The number of Clostridium perfringens decrease about 52% and 56% during the 120s of higienisation process with power 700W and 900W, respectively. Reduction of the overall number of bacteria under the influence of microwave radiation was 42% and 51% (respectively for 700W and 900W, and sticks from the family Enterobacteriaceae from 54% to 70% depending on the power of radiation, the time of operation and biochemical properties.

  12. Nuclear units operating improvement by using operating experience

    International Nuclear Information System (INIS)

    Rotaru, I.; Bilegan, I.C.

    1997-01-01

    The paper presents how the information experience can be used to improve the operation of nuclear units. This areas include the following items: conservative decision making; supervisory oversight; teamwork; control room distraction; communications; expectations and standards; operator training and fundamental knowledge, procedure quality and adherence; plant status awareness. For each of these topics, the information illustrate which are the principles, the lessons learned from operating experience and the most appropriate exemplifying documents. (authors)

  13. Commercial nuclear fuel from U.S. and Russian surplus defense inventories: Materials, policies, and market effects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    Nuclear materials declared by the US and Russian governments as surplus to defense programs are being converted into fuel for commercial nuclear reactors. This report presents the results of an analysis estimating the market effects that would likely result from current plans to commercialize surplus defense inventories. The analysis focuses on two key issues: (1) the extent by which traditional sources of supply, such as production from uranium mines and enrichment plants, would be displaced by the commercialization of surplus defense inventories or, conversely, would be required in the event of disruptions to planned commercialization, and (2) the future price of uranium considering the potential availability of surplus defense inventories. Finally, the report provides an estimate of the savings in uranium procurement costs that could be realized by US nuclear power generating companies with access to competitively priced uranium supplied from surplus defense inventories.

  14. Commercial nuclear fuel from U.S. and Russian surplus defense inventories: Materials, policies, and market effects

    International Nuclear Information System (INIS)

    1998-05-01

    Nuclear materials declared by the US and Russian governments as surplus to defense programs are being converted into fuel for commercial nuclear reactors. This report presents the results of an analysis estimating the market effects that would likely result from current plans to commercialize surplus defense inventories. The analysis focuses on two key issues: (1) the extent by which traditional sources of supply, such as production from uranium mines and enrichment plants, would be displaced by the commercialization of surplus defense inventories or, conversely, would be required in the event of disruptions to planned commercialization, and (2) the future price of uranium considering the potential availability of surplus defense inventories. Finally, the report provides an estimate of the savings in uranium procurement costs that could be realized by US nuclear power generating companies with access to competitively priced uranium supplied from surplus defense inventories

  15. Surplus Facilities and Resource Conservation and Recovery Act Closure program plan, fiscal year 1992

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1991-10-01

    The Surplus Facilities and Resource Conservation and Recovery Act Closure program is responsible to US Department of Energy Field Office, Richland for the safe, cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The Surplus Facilities and Resource Conservation and Recovery Act Closure program is also responsible to US Department of Energy Field Office, Richland for the program management of specific Resource Conservation and Recovery Act closures at the Hanford Site. This program plan addresses only the surplus facilities. The criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy Field Office, Richland, Environmental Restoration Division. The guidelines are consistent with the Westinghouse Hanford Company commitment to decommission Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities until disposal

  16. Operation and Maintenance Plan for the 300-FF-5 Operable Unit

    International Nuclear Information System (INIS)

    Singleton, K.M.

    1996-09-01

    This document is the operation and maintenance plan for the 300-FF-5 groundwater operable unit. The purpose of this plan is to identify tasks necessary to verify the effectiveness of the selected alternative. This plan also describes the monitoring program and administrative tasks that will be used as the preferred alternative for the remediation of groundwater in the 300-FF-5 Operable Unit. The preferred alternative selected for remediation of groundwater consists of institutional controls

  17. Economic and environmental performance of alternative policy measures to reduce nutrient surpluses in Finnish agriculture

    Directory of Open Access Journals (Sweden)

    H. LEHTONEN

    2008-12-01

    Full Text Available This paper provides an economic sector level analysis of the effectiveness of different policy measures in decreasing nitrogen (N and phosphorus (P surpluses from agriculture in order to reduce nutrient runoff from agricultural fields to watercourses and to improve water quality of surface waters. Assuming no changes in the EU level policies after CAP reform 2003 we focus on national level policy measures such as full or partial de-coupling of national support from production, payments for reduced nutrient surpluses of N and P, and N fertiliser tax. None of the analysed policy measures is superior one with respect to environmental performance, since full decoupling of national support would be the most effective in reducing P surpluses while payment for reduced nutrient surplus performed best with respect to N surpluses. Economic performance (farmers’ compliance cost per %-reduction of N or P surplus of full and partial de-coupling of national support is clearly better than that of specialised agri-environmental policy instruments, because both decoupling scenarios result in the increase of farmers’ income in comparison to base scenario, and thus compliance costs are in fact negative in these two cases. Our analysis confirms the fact that the overall policy package matters a lot for the effectiveness of agrienvironmental policy measures. Environmental performance of agri-environmental policy measures may be significantly reduced, if they are implemented jointly with production coupled income support policies. Thus, in order to increase the effectiveness of agri-environmental policy measures agricultural income support policies should be decoupled from production and this alone would bring substantial reduction in nutrient surpluses.;

  18. Junior Leader Training Development in Operational Units

    Science.gov (United States)

    2012-04-01

    UNITS Successful operational units do not arise without tough, realistic, and challenging training. Field Manual (FM) 7-0, Training Units and D...operations. The manual provides junior leaders with guidance on how to conduct training and training management. Of particular importance is the definition...1 Relation htp between ADDIE and the Anny Training Management Model. The Army Training Management Model and ADDIE process appear in TRADOC PAM 350

  19. Analysis of Serbian Military Riverine Units Capability for Participation in the United Nations Peacekeeping Operations

    Directory of Open Access Journals (Sweden)

    Slobodan Radojevic

    2017-06-01

    Full Text Available This paper analyses required personnel, training capacities and equipment for participation in the United Nations peacekeeping operations with the riverine elements. In order to meet necessary capabilities for engagement in United Nations peacekeeping operations, Serbian military riverine units have to be compatible with the issued UN requirements. Serbian Armed Forces have the potential to reach such requirements with the River Flotilla as a pivot for the participation in UN missions. Serbian Military Academy adopted and developed educational and training program in accordance with the provisions and recommendations of the IMO conventions and IMO model courses. Serbian Military Academy has opportunities for education and training military riverine units for participation in the United Nations peacekeeping operations. Moreover, Serbia has Multinational Operations Training Center and Peacekeeping Operations Center certified to provide selection, training, equipping and preparations of individuals and units to the United Nations multinational operations.

  20. Selling money on eBay: A field study of surplus division

    OpenAIRE

    Gizatulina, Alia; Gorelkina, Olga

    2016-01-01

    We study the division of trade surplus in a competitive market environment by conducting a natural field experiment on German eBay. Acting as a seller, we offer Amazon gift cards with face values of up to 500 Euro. Randomly arriving buyers, the subjects of our experiment, make price offers according to eBay rules. Using a novel decomposition method, we infer offered shares of trade surplus and find that the average share proposed to the seller amounts to 29%. Additionally, we document: (i) in...

  1. Dealing with a dangerous surplus from the cold war

    International Nuclear Information System (INIS)

    Gray, L.

    1997-01-01

    The proliferation of nuclear materials is a threat to national security and world peace. This threat complicates the safeguarding and management of fissile materials that have become surplus since the end of the Cold War. The dismantling of weapons and the cessation of new nuclear weapons manufacturing, while positive for world peace, have raised a problem: what to do about the fissile materials recovered from the weapons or in inventories that will remain unused. These materials--primarily plutonium and highly enriched uranium--are environmental, safety, and health concerns. But of more urgency is the threat they pose to national and international security if they fall into the hands of terrorists or rogue nations. As arms reduction continues and amounts of surplus fissile materials increase, the potential for such security breaches will increase

  2. Share-of-Surplus Product Line Optimisation with Price Levels

    Directory of Open Access Journals (Sweden)

    X. G. Luo

    2014-01-01

    Full Text Available Kraus and Yano (2003 established the share-of-surplus product line optimisation model and developed a heuristic procedure for this nonlinear mixed-integer optimisation model. In their model, price of a product is defined as a continuous decision variable. However, because product line optimisation is a planning process in the early stage of product development, pricing decisions usually are not very precise. In this research, a nonlinear integer programming share-of-surplus product line optimization model that allows the selection of candidate price levels for products is established. The model is further transformed into an equivalent linear mixed-integer optimisation model by applying linearisation techniques. Experimental results in different market scenarios show that the computation time of the transformed model is much less than that of the original model.

  3. Countermeasure for Surplus Electricity of PV using Replacement Battery of EVs

    Science.gov (United States)

    Takagi, Masaaki; Iwafune, Yumiko; Yamamoto, Hiromi; Yamaji, Kenji; Okano, Kunihiko; Hiwatari, Ryouji; Ikeya, Tomohiko

    In the power sector, the national government has set the goal that the introduction of PV reaches 53 million kW by 2030. However, large-scale introduction of PV will cause several problems in power systems such as surplus electricity. We need large capacity of pumped storages or batteries for the surplus electricity, but the construction costs of these plants are very high. On the other hand, in the transport sector, Electric Vehicle (EV) is being developed as an environmentally friendly vehicle. To promote the diffusion of EV, it is necessary to build infrastructures that can charge EV in a short time; a battery switch station is one of the solutions to this problem. At a station, the automated switch platform will replace the depleted battery with a fully-charged battery. The depleted battery is placed in a storage room and recharged to be available to other drivers. In this study, we propose the use of station's battery as a countermeasure for surplus electricity of PV and evaluate the economic value of the proposed system. We assumed that 53 million kW of PV is introduced in the nationwide power system and considered two countermeasures for surplus electricity: (1) Pumped storage; (2) Battery of station. The difference in total annual cost between Pumped case and Battery case results in 792.6 billion yen. Hence, if a utility leases the batteries from stations fewer than 792.6 billion yen, the utility will have the cost advantage in Battery case.

  4. 200-UP-2 Operable Unit technical baseline report

    International Nuclear Information System (INIS)

    Deford, D.H.

    1991-02-01

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The ''U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO 3 ) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO 3 Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab

  5. Sleeping money: investigating the huge surpluses of social health insurance in China.

    Science.gov (United States)

    Liu, JunQiang; Chen, Tao

    2013-12-01

    The spreading of social health insurance (SHI) worldwide poses challenges for fledging public administrators. Inefficiency, misuse and even corruption threaten the stewardship of those newly established health funds. This article examines a tricky situation faced by China's largest SHI program: the basic health insurance (BHI) scheme for urban employees. BHI accumulated a 406 billion yuan surplus by 2009, although the reimbursement level was still low. Using a provincial level panel database, we find that the huge BHI surpluses are related to the (temporarily) decreasing dependency ratio, the steady growth of average wages, the extension of BHI coverage, and progress in social insurance agency building. The financial situations of local governments and risk pooling level also matter. Besides, medical savings accounts result in about one third of BHI surpluses. Although these findings are not causal, lessons drawn from this study can help to improve the governance and performance of SHI programs in developing countries.

  6. Disposition of surplus fissile materials via immobilization

    International Nuclear Information System (INIS)

    Gray, L.W.; Kan, T.; Sutcliffe, W.G.; McKibben, J.M.; Danker, W.

    1995-01-01

    In the Cold War aftermath, the US and Russia have agreed to large reductions in nuclear weapons. To aid in the selection of long-term management options, the USDOE has undertaken a multifaceted study to select options for storage and disposition of surplus plutonium (Pu). One disposition alternative being considered is immobilization. Immobilization is a process in which surplus Pu would be embedded in a suitable material to produce an appropriate form for ultimate disposal. To arrive at an appropriate form, we first reviewed published information on HLW immobilization technologies to identify forms to be prescreened. Surviving forms were screened using multi-attribute utility analysis to determine promising technologies for Pu immobilization. We further evaluated the most promising immobilization families to identify and seek solutions for chemical, chemical engineering, environmental, safety, and health problems; these problems remain to be solved before we can make technical decisions about the viability of using the forms for long-term disposition of Pu. All data, analyses, and reports are being provided to the DOE Office of Fissile Materials Disposition to support the Record of Decision that is anticipated in Summer of 1996

  7. Multi-attribute evaluation and choice of alternatives for surplus weapons-usable plutonium disposition at uncertainty

    International Nuclear Information System (INIS)

    Kosterev, V.V.; Bolyatko, V.V.; Khajretdinov, S.I.; Averkin, A.N.

    2014-01-01

    The problem of surplus weapons-usable plutonium disposition is formalized as a multi-attribute problem of a choice of alternatives from a set of possible alternatives under fuzzy conditions. Evaluation and ordering of alternatives for the surplus weapons-usable plutonium disposition and sensitivity analysis are carried out at uncertainty [ru

  8. Analysis of operating reliability of WWER-1000 unit

    International Nuclear Information System (INIS)

    Bortlik, J.

    1985-01-01

    The nuclear power unit was divided into 33 technological units. Input data for reliability analysis were surveys of operating results obtained from the IAEA information system and certain indexes of the reliability of technological equipment determined using the Bayes formula. The missing reliability data for technological equipment were used from the basic variant. The fault tree of the WWER-1000 unit was determined for the peak event defined as the impossibility of reaching 100%, 75% and 50% of rated power. The period was observed of the nuclear power plant operation with reduced output owing to defect and the respective time needed for a repair of the equipment. The calculation of the availability of the WWER-1000 unit was made for different variant situations. Certain indexes of the operating reliability of the WWER-1000 unit which are the result of a detailed reliability analysis are tabulated for selected variants. (E.S.)

  9. 41 CFR 102-37.210 - Must a SASP make a drug-free workplace certification when requesting surplus property for donation?

    Science.gov (United States)

    2010-07-01

    ...-free workplace certification when requesting surplus property for donation? 102-37.210 Section 102-37...) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 37-DONATION OF SURPLUS PERSONAL PROPERTY State Agency for... workplace certification when requesting surplus property for donation? No, you must certify that you will...

  10. Licensed operating reactors. Operating units status report, data as of 2-28-79

    International Nuclear Information System (INIS)

    1979-03-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices and IE Headquarters; and the third section is an appendix containing comparative statistics of U.S. nuclear/fossil capacity, identification of nuclear power plants within regional Electric Reliability Councils, the relative status of U.S. nuclear electric production to all U.S. electric production by state, and selected Edison Electric Institute operating statistics. Throughout the report, statistical factors for periods greater than a report month, or for more than one unit, are computed as the arithmetic average of each unit's individual operating statistics. The statistical factors for each unit for the report month are computed from actual power production for the month. The factors for the life-span of each unit (the ''Cumulative'' column) are reported by the utility and are not entirely re-computed by NRC. Utility power production data is checked for consistency with previously submitted statistics

  11. TEORI SURPLUS BERSIH: VALUASI PERUSAHAAN BERDASARKAN DATA AKUNTANSI

    Directory of Open Access Journals (Sweden)

    DEWA GEDE WIRAMA

    2008-07-01

    Full Text Available Fundamental accounting research under measurement perspective regained researchers’ consideration following the publications of Ohlson (1995 and Feltham and Ohlson (1995 valuation models. While fundamental researches before Ball and Brown (1968 were mostly focusing on the determination of the “correct” income number in economic sense, current fundamental researches are more about firm valuation based on accounting numbers.Ohlson (1995 and Feltham and Ohlson (1995 valuation models are based on clean surplus theory. The theory considers accounting as a wealth creation and distribution recording system, and thus provides the base of the relation between firm value and accounting numbers. Based on neoclassical concept of value, clean surplus theory states that a firm value is equal to its book value plus the present value of expected abnormal earnings, termed as goodwill. Based on that relation, Ohlson (1995 formulated a closed-form valuation model that explain firm value based only on current and one period ahead book value and earnings. Feltham and Ohlson (1995 is an attempt to generalized Ohlson (1995 for accounting conservatism and growth.Clean surplus theory is now used as an alternative to CAPM in estimating cost of capital and risk. While Feltham and Ohlson (1995 model seems to have a misspecification for conservatism, the empirical validity of Ohslon (1995 model has been tested with relatively satisfactory results. The model is deemed to be valid as it explains stock prices. The test results, however, also suggest that there is plenty of room to make further contribution in refining the theory. Further research suggestion includes, among others, examination of factors affecting abnormal earnings and the validity of the theory in general, more accurate specification of LID, and enhancement of Feltham and Ohlson (1995 model in dealing with accounting conservatism and growth.

  12. 45 CFR 205.25 - Eligibility of supplemental security income beneficiaries for food stamps or surplus commodities.

    Science.gov (United States)

    2010-10-01

    ... beneficiaries for food stamps or surplus commodities. 205.25 Section 205.25 Public Welfare Regulations Relating....25 Eligibility of supplemental security income beneficiaries for food stamps or surplus commodities... XVI of the Social Security Act, the State agency shall make the following determinations: (1) The...

  13. The effect of the downturn in oil prices on the external surpluses of the GCC countries

    International Nuclear Information System (INIS)

    Metwally, M.M.

    1993-01-01

    The paper examines the impact of the downturn in oil prices on the performance of the external sectors of the members of the Gulf Co-operation Council (GCC). The paper also develops and tests a simultaneous-equations model to examine the interaction between the economies of the GCC and the rest of the world. The analysis shows that the slump in oil exports has reduced drastically the external surplus of the GCC and has resulted in structural shifts in the import and resource balance functions. (author)

  14. Dynamic model-based N management reduces surplus nitrogen and improves the environmental performance of corn production

    Science.gov (United States)

    Sela, S.; Woodbury, P. B.; van Es, H. M.

    2018-05-01

    The US Midwest is the largest and most intensive corn (Zea mays, L.) production region in the world. However, N losses from corn systems cause serious environmental impacts including dead zones in coastal waters, groundwater pollution, particulate air pollution, and global warming. New approaches to reducing N losses are urgently needed. N surplus is gaining attention as such an approach for multiple cropping systems. We combined experimental data from 127 on-farm field trials conducted in seven US states during the 2011–2016 growing seasons with biochemical simulations using the PNM model to quantify the benefits of a dynamic location-adapted management approach to reduce N surplus. We found that this approach allowed large reductions in N rate (32%) and N surplus (36%) compared to existing static approaches, without reducing yield and substantially reducing yield-scaled N losses (11%). Across all sites, yield-scaled N losses increased linearly with N surplus values above ~48 kg ha‑1. Using the dynamic model-based N management approach enabled growers to get much closer to this target than using existing static methods, while maintaining yield. Therefore, this approach can substantially reduce N surplus and N pollution potential compared to static N management.

  15. Trust and Exchange : Effects of Temporal Embeddedness and Network Embeddedness on Providing and Dividing a Surplus

    NARCIS (Netherlands)

    Gautschi, Thomas

    2002-01-01

    Dissertation of the University of Utrecht Mutually profitable cooperation is characterized by the fact that the combined efforts of the cooperating parties generate a certain surplus. The first part of the book studies the production of a surplus as a trust problem between two actors. Should an

  16. Rising above Decline: Some Uses of Surplus Space.

    Science.gov (United States)

    Hess, Dale E.

    In many communities new arrangements of surplus school space have been made that facilitate use of the space by the people of the districts, encourage government agencies to anticipate and support social transitions where they are necessary, and allow school districts to improve the quality of their programs. This paper is a survey of some of…

  17. 32 CFR 644.551 - Equal opportunity-sales of timber, embedded sand, gravel, stone, and surplus structures.

    Science.gov (United States)

    2010-07-01

    ... § 644.551 Equal opportunity—sales of timber, embedded sand, gravel, stone, and surplus structures... 32 National Defense 4 2010-07-01 2010-07-01 true Equal opportunity-sales of timber, embedded sand, gravel, stone, and surplus structures. 644.551 Section 644.551 National Defense Department of Defense...

  18. Initial startup and operations of Yonggwang Units 3 and 4

    International Nuclear Information System (INIS)

    Collier, T.J.; Chari, D.R.; Kiraly, F.

    1996-01-01

    A significant milestone in the nuclear power industry was achieved in 1995, when Yonggwang (YGN) Units 3 and 4 were accepted into in commercial operation by Korea Electric Power Corporation (KEPCO). YGN Unit 3 was accepted into commercial operation on March 31, 1995, the original date established during project initiation. YGN Unit 4 was accepted into operation on January 1, 1996, 3 months ahead of schedule. Each YGN unit produces approximately 1,050 Mwe and supplies approximately ten percent of the total electric power demand in the Republic of Korea (ROK). The overall plant efficiency is approximately 37% which is at least 1% higher than most nuclear units. Since achieving commercial operation, YGN Unit 3 has operated at essentially full power which has resulted in an annual performance rate in excess of 85%. YGN Unit 3 is the first of six pressurized water reactors which are currently under design and construction in the ROK and serves as the reference design for the Korean Standard Nuclear Power Plant program. Both YGN Units 3 and 4 include a System 800 Nuclear Steam Supply System (NSSS). The NSSS is rated at 2,815 Mwth and is the ABB-CE standard design. The design includes numerous advanced design features which enhance plant safety, performance and operability. A well executed startup test program was successfully completed on both units prior to commercial operation. A summary of the YGN NSSS design features, the startup test program and selected test results demonstrating the performance of those features are presented in this paper

  19. Operating performance of LWR nuclear generating units

    International Nuclear Information System (INIS)

    Pia, S.

    1984-01-01

    This work aims at reviewing, on the basis of historical data, the operational problem areas which explain the degree of availability and productivity achieved up to now by nuclear power plants in commercial operation in the world. The operating performance data of nuclear power plants area analysed with respect to plant type, size and other significant reference parameters and they are evaluated also by comparison with fossil generating unit data. Major performance indices data are presented for both nuclear and fossil units type and distribution of outage causes. Unplanned full outages caused by nuclear power plant equipment and components failure are particulary emphasized. The trend for unplanned full outages due to the failure of components shows decreasing numerical values in 1981 with respect to the previous years. But this result should be weighed with the increasing plant unavailability hours needed for maintenance and repair action (chiefly preventive maintenance on critical components). This means that the number and downtime of forced outage must be drastically reduced for economic reasons (production losses and problems associated with the unavailable unit unplanned replacement) as well as for plant safe and reliable operation (sudden unavailability of key components and frequency of transients associated with plant shutdown and routine startup operation)

  20. The Impact of Financing Surpluses and Large Financing Deficits on Tests of the Pecking Order Theory

    NARCIS (Netherlands)

    de Jong, Abe; Verbeek, Marno; Verwijmeren, Patrick

    2010-01-01

    This paper extends the basic pecking order model of Shyam-Sunder and Myers by separating the effects of financing surpluses, normal deficits, and large deficits. Using a panel of US firms over the period 1971-2005, we find that the estimated pecking order coefficient is highest for surpluses (0.90),

  1. Characteristics of Primary Care Trusts in financial deficit and surplus - a comparative study in the English NHS.

    Science.gov (United States)

    Badrinath, Padmanabhan; Currell, Rosemary Anne; Bradley, Peter M

    2006-06-01

    Recently the financial status of primary care trusts has come under considerable scrutiny by the government, and financial deficits have been blamed on poor local management of resources. This paper examines the factors that differ between those Primary Care Trusts (PCT) in financial deficit and those in surplus, using readily available data at PCT level. PCTs are the National Health Service organisations in England responsible for improving the health of their population, developing primary and community health services, and commissioning secondary care services. A descriptive comparative study using data from 58 PCTs; 29 in greatest financial surplus and 29 in greatest deficit in the English National Health Service. Nearly half the study deficit PCTs (14 out of 29) are in the East of England and of the 29 surplus PCTs, five each are in Birmingham and Black Country Strategic Health Authority (SHA), and Greater Manchester SHA. The median population density of the deficit PCTs is almost seven times lower than that of surplus PCTs (p = 0.004). Surplus PCTs predominantly serve deprived communities. Nearly half the surplus PCTs are 'spearhead' PCTs compared to only one of the deficit PCTs. Percentage population increase by local authority of the PCT showed that on average deficit PCTs had 2.7 times higher change during 1982-2002 (13.37% for deficit and 4.94% for surplus PCTs). Work pressure felt by staff is significantly higher in deficit PCTs, and they also reported working higher amount of extra hours due to work pressures. The proportion of dispensing general practitioners is significantly higher in deficit PCTs 40.5% vs. 12.9% (p = 0.002). Deficit PCTs on average received pound123 less per head of registered population compared to surplus PCTs. The two groups of PCTs serve two distinct populations with marked differences between the two. Deficit PCTs tend to be in relatively affluent and rural areas. Poor management alone is unlikely to be the cause of deficits

  2. Determinants of rural household marketed surplus for cereal crops ...

    African Journals Online (AJOL)

    ... and supply of cereal crops to the market (market surplus). The study utilized cross sectional data obtained through multistage random sampling method. Ordinary least square method was used for the analysis. Finding revealed that the quantity of food crops reserved for home consumption by households increased their ...

  3. A Mystery of the Global Surplus and its Ramification

    Directory of Open Access Journals (Sweden)

    Malović Marko

    2013-07-01

    Full Text Available This paper deals with phenomenon of the increasingly indicative global imbalances and lagging genesis of balance of payments (BoP accounting in an attempt to accommodate the ongoing mutation of international trade and finance. Namely, although BoP of the world as a whole should be zero since international trade in goods, services and financial assets ought to be a zero-sum game, our planet apparently runs a non-negligible and rising BoP surplus, projected to reach 1% of global GDP by 2015! To make the puzzle more bizarre, IMF statistics up until 2004 had recorded a persistent BoP deficit for the entire globe, which P. Krugman dubbed “The Mystery of the missing Surplus”. Well, surplus is back with the vengeance – while this paper tries to make sense of the phenomenon and pinpoint both its determinants and likely economic consequences. In conclusion, it appears that 1 during international financial crises quality and accuracy of the BoP statistics worsens worldwide, 2 net global imbalances may still be much smaller than we commonly believe, 3 true culprits may not be our usual suspects, 4 gross trade exhibits stark differences once confronted with decomposed value-added net exports and imports free of double counted processed exports and indirect exporting, 5 also, deliberate misreporting of cross-border investment proceeds as well as MNE’s transfer pricing practices may account for a relevant portion of registered global imbalances, and finally, 6 even the latest 6th edition of the IMF’s BoP and IIP Manual explicitly tackles but a few of the factors behind the returning surplus mystery.

  4. Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-05-14

    On May 22, 1997, DOE published a Notice of Intent in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the ''Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS)''. ''The Surplus Plutonium Disposition Draft Environmental Impact Statement'' (SPD Draft EIS) (DOWEIS-0283-D) was prepared in accordance with NEPA and issued in July 1998. It identified the potential environmental impacts of reasonable alternatives for the proposed siting, construction, and operation of three facilities for plutonium disposition. These three facilities would accomplish pit disassembly and conversion, immobilization, and MOX fuel fabrication. For the alternatives that included MOX fuel fabrication, the draft also described the potential environmental impacts of using from three to eight commercial nuclear reactors to irradiate MOX fuel. The potential impacts were based on a generic reactor analysis that used actual reactor data and a range of potential site conditions. In May 1998, DCE initiated a procurement process to obtain MOX fuel fabrication and reactor irradiation services. The request for proposals defined limited activities that may be performed prior to issuance of the SPD EIS Record of Decision (ROD) including non-site-specific work associated with the development of the initial design for the MOX fuel fabrication facility, and plans (paper studies) for outreach, long lead-time procurements, regulatory management, facility quality assurance, safeguards, security, fuel qualification, and deactivation. No construction on the proposed MOX facility would begin before an SPD EIS ROD is issued. In March 1999, DOE awarded a contract to Duke Engineering & Services; COGEMA, Inc.; and Stone & Webster (known as DCS) to provide the requested

  5. Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1999-01-01

    On May 22, 1997, DOE published a Notice of Intent in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the ''Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS)''. ''The Surplus Plutonium Disposition Draft Environmental Impact Statement'' (SPD Draft EIS) (DOWEIS-0283-D) was prepared in accordance with NEPA and issued in July 1998. It identified the potential environmental impacts of reasonable alternatives for the proposed siting, construction, and operation of three facilities for plutonium disposition. These three facilities would accomplish pit disassembly and conversion, immobilization, and MOX fuel fabrication. For the alternatives that included MOX fuel fabrication, the draft also described the potential environmental impacts of using from three to eight commercial nuclear reactors to irradiate MOX fuel. The potential impacts were based on a generic reactor analysis that used actual reactor data and a range of potential site conditions. In May 1998, DCE initiated a procurement process to obtain MOX fuel fabrication and reactor irradiation services. The request for proposals defined limited activities that may be performed prior to issuance of the SPD EIS Record of Decision (ROD) including non-site-specific work associated with the development of the initial design for the MOX fuel fabrication facility, and plans (paper studies) for outreach, long lead-time procurements, regulatory management, facility quality assurance, safeguards, security, fuel qualification, and deactivation. No construction on the proposed MOX facility would begin before an SPD EIS ROD is issued. In March 1999, DOE awarded a contract to Duke Engineering and Services; COGEMA, Inc.; and Stone and Webster (known as DCS) to provide the requested services. The procurement process

  6. IN DEFENSE OF BULGARIAN CONSUMERS AND PRODUCERS – THE PROBLEM OF SURPLUS CHARGES AND DISCOUNTS

    Directory of Open Access Journals (Sweden)

    Krasimir Davchev

    2015-03-01

    Full Text Available In a market economy the term "market price" should reflect the market opportunities of users (amount of income and not to violate the economic interests of the producers. Structure of the economy is such that the predominant not only in Bulgaria but also in the other European countries is the sector of trade and services, where the main income for the traders are the margins or surplus charges. The article contains an analysis of the surplus charges of three main commodity groups - white flour, oil and sugar based on official data from the Ministry of Agriculture and Food. The analysis covers margins of the three major sales markets of food - commodity markets, large retail chains and other stores for retail sale. The results suggest that in addition to the normal surplus charges for wholesale and retail, there are the so called by the author "parasitic surplus charges" that are not controlled nor penalized in any way. In this respect, the author proposes the adoption by the Council of Ministers Regulation on the surplus charges with which to resolve this problem. Moreover, the author notes, and there are plenty of discounts that major retailers impose on Bulgarian producers and suppliers. Since these traders do not fall under the legal concept of "dominant market position", they are not sanctioned by the Commission for Protection of Competition. In this regard, the author suggests introducing in the Law on Protection of Competition concept of "economic dependence" or the preparation of sectoral trade law with which to regulate not only this issue but also trade margins.

  7. A Mystery of the Global Surplus and its Ramification

    Directory of Open Access Journals (Sweden)

    Marko G Malovic

    2013-07-01

    Full Text Available This paper deals with phenomenon of the increasingly indicative global imbalances and lagging genesis of balance of payments (BoP accounting in an attempt to accommodate the ongoing mutation of international trade and finance. Namely, although BoP of the world as a whole should be zero since international trade in goods, services and financial assets ought to be a zero-sum game, our planet apparently runs a non-negligible and rising BoP surplus, projected to reach 1% of global GDP by 2015! To make the puzzle more bizarre, IMF statistics up until 2004 had recorded a persistent BoP deficit for the entire globe, which P. Krugman dubbed “The Mystery of the missing Surplus”. Well, surplus is back with the vengeance – while this paper tries to make sense of the phenomenon and pinpoint both its determinants and likely economic consequences. In conclusion, it appears that 1 during international financial crises quality and accuracy of the BoP statistics worsens worldwide, 2 net global imbalances may still be much smaller than we commonly believe, 3 true culprits may not be our usual suspects, 4 gross trade exhibits stark differences once confronted with decomposed value-added net exports and imports free of double counted processed exports and indirect exporting, 5 also, deliberate misreporting of cross-border investment proceeds as well as MNE’s transfer pricing practices may account for a relevant portion of registered global imbalances, and finally, 6 even the latest 6th edition of the IMF’s BoP and IIP Manual explicitly tackles but a few of the factors behind the returning surplus mystery. Normal 0 false false false EN-US X-NONE X-NONE

  8. Biota of the 300-FF-1 operable unit. [Westinghouse Hanford Company

    Energy Technology Data Exchange (ETDEWEB)

    Rickard, W.H. Jr.; Fitzner, R.E.; Brandt, C.A.

    1990-10-01

    This report summarizes Task 5a-2 of the Phase I Remedial Investigation -- Operable Unit Characterization of the 300-FF-1 Operable Unit on the Hanford Site, near Richland, Washington. The ultimate goal of Phase I is to determine the nature and extent of the threat to public health and the environment from releases of hazardous substances from the operable unit. The purpose of Task 5a-2 was to determine what species inhabit the 300-FF-1 Operable Unit and how they use the unit. The focus is on those species listed as endangered or threatened, those that are economically important, or those that constitute significant components of the human food chain. 39 refs., 5 figs., 5 tabs.

  9. Paper Prototyping: The Surplus Merit of a Multi-Method Approach

    Directory of Open Access Journals (Sweden)

    Stephanie Bettina Linek

    2015-07-01

    Full Text Available This article describes a multi-method approach for usability testing. The approach combines paper prototyping and think-aloud with two supplemental methods: advanced scribbling and a handicraft task. The method of advanced scribbling instructs the participants to use different colors for marking important, unnecessary and confusing elements in a paper prototype. In the handicraft task the participants have to tinker a paper prototype of their wish version. Both methods deliver additional information on the needs and expectations of the potential users and provide helpful indicators for clarifying complex or contradictory findings. The multi-method approach and its surplus benefit are illustrated by a pilot study on the redesign of the homepage of a library 2.0. The findings provide positive evidence for the applicability of the advanced scribbling and the handicraft task as well as for the surplus merit of the multi-method approach. The article closes with a discussion and outlook. URN: http://nbn-resolving.de/urn:nbn:de:0114-fqs150379

  10. Feasibility study report for the 200-BP-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9{times}10{sup {minus}5}.

  11. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9x10 -5

  12. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1994-01-01

    This feasibility study (FS) examines a range of alternatives and provides recommendations for selecting a preferred altemative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965-1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-:levels of contamination with cesium-137, radium-226, strontium-90, thorium-228 and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9 x 10 5

  13. 41 CFR 102-37.530 - What are FAA's responsibilities in the donation of surplus property to public airports?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are FAA's... § 102-37.530 What are FAA's responsibilities in the donation of surplus property to public airports? In the donation of surplus property to public airports, the Federal Aviation Administration (FAA), acting...

  14. 41 CFR 102-37.85 - Can surplus property being offered for sale be withdrawn and approved for donation?

    Science.gov (United States)

    2010-07-01

    ... being offered for sale be withdrawn and approved for donation? 102-37.85 Section 102-37.85 Public... MANAGEMENT REGULATION PERSONAL PROPERTY 37-DONATION OF SURPLUS PERSONAL PROPERTY General Provisions Donation Overview § 102-37.85 Can surplus property being offered for sale be withdrawn and approved for donation...

  15. Consumer Surplus in the Digital Economy: Estimating the Value of Increased Product Variety at Online Booksellers

    OpenAIRE

    Brynjolfsson, Erik; Smith, Michael D.; Yu, (Jeffrey) Hu

    2003-01-01

    We present a framework and empirical estimates that quantify the economic impact of increased product variety made available through electronic markets. While efficiency gains from increased competition significantly enhance consumer surplus, for instance, by leading to lower average selling prices, our present research shows that increased product variety made available through electronic markets can be a significantly larger source of consumer surplus gains. One reason for increased product...

  16. Analysis of yam marketable surplus in Imo state, Nigeria | Onyenobi ...

    African Journals Online (AJOL)

    This study was conducted in Imo State in the southeastern agricultural zone of Nigeria, to determine socio-economic characteristics of farmers; cost and return of farmers and factors that determine the marketable surplus of farmers. Among the farm enterprises in the state, yam has high- income elasticity of demand by ...

  17. Analysis and Research on the effect of the Operation of Small Hydropower in the Regional Power Grid

    Science.gov (United States)

    Ang, Fu; Guangde, Dong; Xiaojun, Zhu; Ruimiao, Wang; Shengyi, Zhu

    2018-03-01

    The analysis of reactive power balance and voltage of power network not only affects the system voltage quality, but also affects the economic operation of power grid. In the calculation of reactive power balance and voltage analysis in the past, the problem of low power and low system voltage has been the concern of people. When small hydropower stations in the wet period of low load, the analysis of reactive power surplus and high voltage for the system, if small hydropower unit the capability of running in phase is considered, it can effectively solve the system low operation voltage of the key point on the high side.

  18. ORNL Surplus Facilities Management Program maintenance and surveillance plan for fiscal year 1984

    International Nuclear Information System (INIS)

    Coobs, J.H.; Myrick, T.E.

    1986-10-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy's (DOE) National SFMP, administered by the Richland Operations Office. The purpose and objectives of the national program are set forth in the current SFMP Program Plan and include (1) the maintenance and surveillance of facilities awaiting decommissioning, (2) planning for the orderly decommissioning of these facilities, and (3) implementation of a program to accomplish the facility disposition in a safe, cost-effective, and timely manner. As outlined in the national program plan, participating SFMP contractors are required to prepare a formal plan that documents the maintenance and surveillance (M and S) programs established for each site. This report has been prepared to provide this documentation for those facilties included in the ORNL SFMP

  19. 200-BP-5 operable unit Technical Baseline report

    International Nuclear Information System (INIS)

    Jacques, I.D.; Kent, S.K.

    1991-10-01

    This report supports development of a remedial investigation/feasibility study work plan for the 200-BP-5 operable unit. The report summarizes baseline information for waste sites and unplanned release sites located in the 200-BP-5 operable unit. The sites were investigated by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The investigation consisted of review and evaluation of current and historical Hanford Site reports, drawings, and photographs, and was supplemented with recent inspections of the Hanford Site and employee interviews. No field investigations or sampling were conducted

  20. Unpacking Referent Units in Fraction Operations

    Science.gov (United States)

    Philipp, Randolph A.; Hawthorne, Casey

    2015-01-01

    Although fraction operations are procedurally straightforward, they are complex, because they require learners to conceptualize different units and view quantities in multiple ways. Prospective secondary school teachers sometimes provide an algebraic explanation for inverting and multiplying when dividing fractions. That authors of this article…

  1. Centrifugal microfluidic platforms: advanced unit operations and applications.

    Science.gov (United States)

    Strohmeier, O; Keller, M; Schwemmer, F; Zehnle, S; Mark, D; von Stetten, F; Zengerle, R; Paust, N

    2015-10-07

    Centrifugal microfluidics has evolved into a mature technology. Several major diagnostic companies either have products on the market or are currently evaluating centrifugal microfluidics for product development. The fields of application are widespread and include clinical chemistry, immunodiagnostics and protein analysis, cell handling, molecular diagnostics, as well as food, water, and soil analysis. Nevertheless, new fluidic functions and applications that expand the possibilities of centrifugal microfluidics are being introduced at a high pace. In this review, we first present an up-to-date comprehensive overview of centrifugal microfluidic unit operations. Then, we introduce the term "process chain" to review how these unit operations can be combined for the automation of laboratory workflows. Such aggregation of basic functionalities enables efficient fluidic design at a higher level of integration. Furthermore, we analyze how novel, ground-breaking unit operations may foster the integration of more complex applications. Among these are the storage of pneumatic energy to realize complex switching sequences or to pump liquids radially inward, as well as the complete pre-storage and release of reagents. In this context, centrifugal microfluidics provides major advantages over other microfluidic actuation principles: the pulse-free inertial liquid propulsion provided by centrifugal microfluidics allows for closed fluidic systems that are free of any interfaces to external pumps. Processed volumes are easily scalable from nanoliters to milliliters. Volume forces can be adjusted by rotation and thus, even for very small volumes, surface forces may easily be overcome in the centrifugal gravity field which enables the efficient separation of nanoliter volumes from channels, chambers or sensor matrixes as well as the removal of any disturbing bubbles. In summary, centrifugal microfluidics takes advantage of a comprehensive set of fluidic unit operations such as

  2. Performance assessment of DOE spent nuclear fuel and surplus plutonium

    International Nuclear Information System (INIS)

    Duguid, J.O.; Vallikat, V.; McNeish, J.

    1998-01-01

    Yucca Mountain, in southern Nevada, is under consideration by the US Department of Energy (DOE) as a potential site for the disposal of the nation's radioactive wastes in a geologic repository. The wastes consist of commercial spent fuel, DOE spent nuclear fuel (SNF), high level waste (HLW), and surplus plutonium. The DOE was mandated by Congress in the fiscal 1997 Energy and Water Appropriations Act to complete a viability assessment (VA) of the repository in September of 1998. The assessment consists of a preliminary design concept for the critical elements of the repository, a total system performance assessment (TSPA), a plan and cost estimate for completion of the license application, and an estimate of the cost to construct and operate the repository. This paper presents the results of the sensitivity analyses that were conducted to examine the behavior of DOE SNF and plutonium waste forms in the environment of the base case repository that was modeled for the TSPA-VA. Fifteen categories of DOE SNF and two Plutonium waste forms were examined and their contribution to radiation dose to humans was evaluated

  3. The Value Relevance of Dirty Surplus Accounting Flows in the Netherlands

    NARCIS (Netherlands)

    Wang, Y.; Buijink, W.F.J.; Eken Ra, R.C.W.

    2003-01-01

    Recently the Dutch financial reporting standard setters have taken steps to make dirty surplus accounting flows more visible to parties outside firms, either by eliminating their possibility or by requiring comprehensive income type statements. These steps are presumably based on the idea that dirty

  4. Twenty years of operation of WWER 440/230 units in Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Tomek, J.

    1998-01-01

    It is twenty years this year since the first unit WWER 440 of Slovak Nuclear Power Plant Jaslovske Bohunice was commissioned. There are four units WWER 440 in operation Jaslovske Bohunice site. First two units of older soviet PWR design V-230 (also known as V-1) and other two units of newer V-213 type (also known as V-2). The goal of this presentation is to summarize and evaluate the operation of Unit 1 and 2 for this period of time and mainly to describe what has been done and what is planned to be done to increase the nuclear safety and operational reliability of both units. The operating organization and regulatory authority assume that an internationally acceptable level of safety will be reached by accomplishing of the upgrading program.(author)

  5. Surplus Highly Enriched Uranium Disposition Program plan

    International Nuclear Information System (INIS)

    1996-10-01

    The purpose of this document is to provide upper level guidance for the program that will downblend surplus highly enriched uranium for use as commercial nuclear reactor fuel or low-level radioactive waste. The intent of this document is to outline the overall mission and program objectives. The document is also intended to provide a general basis for integration of disposition efforts among all applicable sites. This plan provides background information, establishes the scope of disposition activities, provides an approach to the mission and objectives, identifies programmatic assumptions, defines major roles, provides summary level schedules and milestones, and addresses budget requirements

  6. Eielson Air Force Base Operable Unit 2 baseline risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, R.E.; Jarvis, T.T.; Jarvis, M.R.; Whelan, G.

    1994-10-01

    Operable Unit 2 at Eielson Air Force Base (AFB) near Fairbanks, is one of several operable units characterized by petroleum, oil, and lubricant contamination, and by the presence of organic products floating at the water table, as a result of Air Force operations since the 1940s. The base is approximately 19,270 acres in size, and comprises the areas for military operations and a residential neighborhood for military dependents. Within Operable Unit 2, there are seven source areas. These source areas were grouped together primarily because of the contaminants released and hence are not necessarily in geographical proximity. Source area ST10 includes a surface water body (Hardfill Lake) next to a fuel spill area. The primary constituents of concern for human health include benzene, toluene, ethylbenzene, and xylenes (BTEX). Monitored data showed these volatile constituents to be present in groundwater wells. The data also showed an elevated level of trace metals in groundwater.

  7. Operational safety experience reporting in the United States

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1978-01-01

    Licensees of nuclear power plants in the United States have many reporting requirements included in their technical specifications and the code of federal regulations, title 10. The Nuclear Regulatory Commisson receives these reports and utilizes them in its regulatory program. Part of this usage includes collecting and publishing this operating experience data in various reports and storing information in various data systems. This paper will discuss the data systems and reports on operating experience published and used by the NRC. In addition, some observations on operating experience will be made. Subjects included will be the Licensee Event Report (LER) Data File, the Operating Unit Status Report (Gray Book), Radiation Exposure Reports, Effluents Reports, the Nuclear Plant Reliability Data System, Current Events, Bulletin Wrapups and Annual Summaries. Some of the uses of the reports and systems will be discussed. The Abnormal Occurence Report to the US Congress will also be described and discussed. (author)

  8. When health policy and empirical evidence collide: the case of cigarette package warning labels and economic consumer surplus.

    Science.gov (United States)

    Song, Anna V; Brown, Paul; Glantz, Stanton A

    2014-02-01

    In its graphic warning label regulations on cigarette packages, the Food and Drug Administration severely discounts the benefits of reduced smoking because of the lost "pleasure" smokers experience when they stop smoking; this is quantified as lost "consumer surplus." Consumer surplus is grounded in rational choice theory. However, empirical evidence from psychological cognitive science and behavioral economics demonstrates that the assumptions of rational choice are inconsistent with complex multidimensional decisions, particularly smoking. Rational choice does not account for the roles of emotions, misperceptions, optimistic bias, regret, and cognitive inefficiency that are germane to smoking, particularly because most smokers begin smoking in their youth. Continued application of a consumer surplus discount will undermine sensible policies to reduce tobacco use and other policies to promote public health.

  9. THE EFFECT OF A MALE SURPLUS ON INTIMATE PARTNER VIOLENCE IN INDIA.

    Science.gov (United States)

    Bose, Sunita; Trent, Katherine; South, Scott J

    2013-08-31

    Theories of the social consequences of imbalanced sex ratios posit that men will exercise extraordinarily strict control over women's behaviour when women's relationship options are plentiful and men's own options are limited. We use data from the third wave of the Indian National Family and Health Survey, conducted in 2005-06, to explore this issue, investigating the effect of the community sex ratio on women's experience of intimate partner violence in India. Multilevel logistic regression models show that a relative surplus of men in a community increases the likelihood of physical abuse by husbands even after adjusting for various other individual, household, and geographic characteristics. Further evidence of control over women when there is a sex ratio imbalance is provided by the increased odds of husbands distrusting wives with money when there is a male surplus in the local community.

  10. [Thought Experiments of Economic Surplus: Science and Economy in Ernst Mach's Epistemology].

    Science.gov (United States)

    Wulz, Monika

    2015-03-01

    Thought Experiments of Economic Surplus: Science and Economy in Ernst Mach's Epistemology. Thought experiments are an important element in Ernst Mach's epistemology: They facilitate amplifying our knowledge by experimenting with thoughts; they thus exceed the empirical experience and suspend the quest for immediate utility. In an economical perspective, Mach suggested that thought experiments depended on the production of an economic surplus based on the division of labor relieving the struggle for survival of the individual. Thus, as frequently emphasized, in Mach's epistemology, not only the 'economy of thought' is an important feature; instead, also the socioeconomic conditions of science play a decisive role. The paper discusses the mental and social economic aspects of experimental thinking in Mach's epistemology and examines those within the contemporary evolutionary, physiological, and economic contexts. © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  11. STEM crisis or STEM surplus? Yes and yes.

    Science.gov (United States)

    Xue, Yi; Larson, Richard C

    2015-05-01

    The last decade has seen considerable concern regarding a shortage of science, technology, engineering, and mathematics (STEM) workers to meet the demands of the labor market. At the same time, many experts have presented evidence of a STEM worker surplus. A comprehensive literature review, in conjunction with employment statistics, newspaper articles, and our own interviews with company recruiters, reveals a significant heterogeneity in the STEM labor market: the academic sector is generally oversupplied, while the government sector and private industry have shortages in specific areas.

  12. The Democratic Surplus that Constitutionalised the European Union

    DEFF Research Database (Denmark)

    Harste, Gorm

    2015-01-01

    This article questions the very foundation of the doctrine of a so-called “democratic deficit” in the EU. Yet in order to argue beyond nationalist myths, clear-cut concepts are necessary. Speaking about democracy in the EU, the article exposes four dimensions that constitute a “democratic surplus...... nation-state, the EU, secondly, is not build by nobles and monarchs, nor by war. Third, a separation of powers is obvious. And fourth, this article demonstrates how the EU rescued the democratic nation-state....

  13. Management strategies for surplus electricity loads using electrolytic hydrogen

    International Nuclear Information System (INIS)

    Gutierrez-Martin, F.; Garcia-De Maria, J.M.; Bairi, A.; Laraqi, N.

    2009-01-01

    Management of electricity-hydrogen binomials is greatly enhanced by the knowledge of power variations, together with an optimized performance of the electrolyzers. Strategies include the regulation of current densities to minimize hydrogen costs, which depend of the energy prices, the power of installations and utilization factors. The objective is to convert the energy in distinct periods of electricity demand, taking into account the size and efficiency of the equipments; this approach indicates the possibility to reduce costs below a reference price, either by using small facilities which consume high proportions of surplus energy or larger plants for shorter off-peak periods. Thus, we study the viability of large scale production of hydrogen via electrolysis, within the context of excess electricity loads in France (estimated at 22 TWh in 2007): that gives a daily hydrogen potential of 1314 ton, from a total installed power of 5800 MW and average utilization ratios of 42.8%; the production cost approaches 1$/kg H2 , and CO 2 reduction potential amounts 6720 kton/year (if all the produced hydrogen is used to feed 3 million of new fuel-cell vehicles). This analysis serves to demonstrate the great potentials for converting the surplus energy into hydrogen carriers and for managing the power subsystem in thoroughly electrified societies. (author)

  14. Patients' Attitudes towards the Surplus Frozen Embryos in China

    Directory of Open Access Journals (Sweden)

    Xuan Jin

    2013-01-01

    Full Text Available Background. Assisted reproductive techniques have been used in China for more than 20 years. This study investigates the attitudes of surplus embryo holders towards embryos storage and donation for medical research. Methods. A total of 363 couples who had completed in vitro fertilization (IVF treatment and had already had biological children but who still had frozen embryos in storage were invited to participate. Interviews were conducted by clinics in a narrative style. Results. Family size was the major reason for participants’ (discontinuation of embryo storage; moreover, the moral status of embryos was an important factor for couples choosing embryo storage, while the storage fee was an important factor for couples choosing embryo disposal. Most couples discontinued the storage of their embryos once their children were older than 3 years. In our study, 58.8% of the couples preferred to dispose of surplus embryos rather than donate them to research, citing a lack of information and distrust in science as significant reasons for their decision. Conclusions. Interviews regarding frozen embryos, including patients’ expectations for embryo storage and information to assist them with decisions regarding embryo disposal, are beneficial for policies addressing embryo disposition and embryo donation in China.

  15. 200-UP-2 operable unit radiological surveys

    International Nuclear Information System (INIS)

    Wendling, M.A.

    1994-01-01

    This report summarizes and documents the results of the radiological surveys conducted from August 17 through December 16, 1993 over a partial area of the 200-UP-2 Operable Unit, 200-W Area, Hanford Site, Richland, Washington. In addition, this report explains the survey methodology of the Mobile Surface Contamination Monitor 11 (MSCM-II) and the Ultra Sonic Ranging And Data System (USRADS). The radiological survey of the 200-UP-2 Operable Unit was conducted by the Site Investigative Surveys/Environmental Restoration Health Physics Organization of the Westinghouse Hanford Company. The survey methodology for the majority of area was based on utilization of the MSCM-II or the USRADS for automated recording of the gross beta/gamma radiation levels at or near six (6) inches from the surface soil

  16. Treatment of swine manure: case studies in European’s N-surplus areas

    Directory of Open Access Journals (Sweden)

    Maria Cruz García-González

    Full Text Available ABSTRACT In this study, eight different manure treatment plants were monitored. The plants were four on-farm and four centralized treatment plants, all of them at full-scale level. Assessment includes a total of seven pre-treatment and process units as follows: mechanical separation, with and without coagulant and flocculant addition, pasteurization, nitrification-denitrification, anaerobic digestion, and composting. The plants are located in nutrient surplus areas of three European Member States (Spain, Italy and Denmark, the majority of these areas being Nitrate Vulnerable Zones (NVZ. Results presented herein are data collected over a six-month period and comprise performance data of the treatment plants, pathogen indicators (E.coli and Salmonella and greenhouse gas (GHG emissions data under two scenarios: 1 the baseline scenario and 2 the treatment plant scenario. The assessment includes GHG emissions of the storage facilities, transportation, and subsequent intermediate storage, electric consumption, electric production, composting, and land application. All treatment plants studied generated a significant reduction in GHG emissions (between 53 and 90 % in comparison to the baseline scenario. Organic matter and total solids (TS content in manure were also greatly reduced, with values ranging between 35-53 % of chemical oxygen demand (COD and, 24-61 % of TS for anaerobic digestion (AD treatment plants, 77-93 % COD and 70 % TS in the case of AD combined with nitrogen (N-removal unit plants. Nitrogen concentrations were also greatly reduced (between 65-85 % total Kjeldahl nitrogen (TKN and 68-83 % ammonium (NH4+-N in plants with N-removal units.

  17. Tobacco Regulation and Cost-Benefit Analysis: How Should We Value Foregone Consumer Surplus?

    Science.gov (United States)

    Levy, Helen G.; Norton, Edward C.; Smith, Jeffrey A.

    2016-01-01

    Recent tobacco regulations proposed by the Food and Drug Administration have raised a thorny question: how should the cost-benefit analysis accompanying such policies value foregone consumer surplus associated with regulation-induced reductions in smoking? In a model with rational and fully informed consumers, this question is straightforward. There is disagreement, however, about whether consumers are rational and fully informed, and the literature offers little practical guidance about what approach the FDA should use if they are not. In this paper, we outline the history of the FDA’s recent attempts to regulate cigarettes and other tobacco products and how they have valued foregone consumer surplus in cost-benefit analyses. We advocate replacing the approach used in most of this literature, which first calculates health gains associated with regulation and then “offsets” them by some factor reflecting consumer surplus losses, with a more general behavioral public finance framework for welfare analysis. This framework applies standard tools of welfare analysis to consumer demand that may be “biased” (that is, not necessarily rational and fully informed) without requiring specific assumptions about the reason for the bias. This framework would require estimates of both biased and unbiased consumer demand; we sketch an agenda to help develop these in the context of smoking. The use of this framework would substantially reduce the confusion currently surrounding welfare analysis of tobacco regulation. PMID:29404381

  18. United States of America, European economy and inequality: A perspective from the economic history, 1910-2010

    Directory of Open Access Journals (Sweden)

    Carles Manera

    2017-09-01

    Full Text Available This paper analyzes the impact of the Great Recession on the economies of the United States and the major economies of Europe (Germany, France, United Kingdom, Italy, Spain, based on the analysis of the national accounts of the countries chosen. The paper provides additional weight to the conclusions reached by Piketty, but using different sources: a reduction in the share of wages in national income and an increase in social inequality. This can be explained because the downward trend in capital productivity cannot be corrected, so an increase in the share of gross operating surplus in national income (q and in social inequality is bolstered to maintain the rate of profit, a process which is accompanied by the growing financialization of the economy.

  19. Increasing the flexibility of base-load generating units in operation on fossil fuel

    Energy Technology Data Exchange (ETDEWEB)

    Girshfel' d, V Ya; Khanaev, V A; Volkova, E D; Gorelov, V A; Gershenkroi, M L

    1979-01-01

    Increasing the flexibility of base-load generating units operating on fossil fuel by modifying them is a necessary measure. The highest economic effect is attained with modification of gas- and oil-fired generating units in the Western United Power Systems of the European part of the SPSS. On the basis of available experience, 150- and 200-MW units can be extensively used to regulate the power in the European part of the SPSS through putting them into reserve for the hours of the load dip at night. The change under favorable conditions of 150- and 200-MW units operating on coal to a district-heating operating mode does not reduce the possibilities for flexible operation of these units because it is possible greatly to unload the turbines while the minimum load level of the pulverized fuel fired boiler is retained through transferring a part of the heat load to the desuperheater. It is necessary to accumulate and analyze experience with operation of generating units (especially of supercritical units) with regular shutdowns and starts of groups of units and to solve the problems of modification of generating units, with differentiation with respect to types of fuel and to the united power supply system.

  20. 100-KR-1 Operable Unit focused feasibility study report

    International Nuclear Information System (INIS)

    1994-11-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Feasibility Study (FS) includes development and screening of alternatives and the detailed analysis of alternatives. This focused feasibility study (FFS) was conducted for the 100-KR-1 Operable Unit at the Hanford Site in southeastern Washington. The objective of this operable unit-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for the five sites (116-K-1 crib, 116-K-2 trench, 116-KE-4 and 116-KW-3 retention basins, and process effluent pipelines) associated with the 100-KR-1 Operable Unit. The IRM candidate waste sites are determined in the limited field investigation. Site profiles are developed for each of these waste site. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  1. When Health Policy and Empirical Evidence Collide: The Case of Cigarette Package Warning Labels and Economic Consumer Surplus

    Science.gov (United States)

    Song, Anna V.; Brown, Paul

    2014-01-01

    In its graphic warning label regulations on cigarette packages, the Food and Drug Administration severely discounts the benefits of reduced smoking because of the lost “pleasure” smokers experience when they stop smoking; this is quantified as lost “consumer surplus.” Consumer surplus is grounded in rational choice theory. However, empirical evidence from psychological cognitive science and behavioral economics demonstrates that the assumptions of rational choice are inconsistent with complex multidimensional decisions, particularly smoking. Rational choice does not account for the roles of emotions, misperceptions, optimistic bias, regret, and cognitive inefficiency that are germane to smoking, particularly because most smokers begin smoking in their youth. Continued application of a consumer surplus discount will undermine sensible policies to reduce tobacco use and other policies to promote public health. PMID:24328661

  2. Two ways to handle a pension plan surplus.

    Science.gov (United States)

    Beautyman, M J

    1991-01-01

    A healthcare organization wanting to tap into its pension plan surplus may be reluctant to do so for fear of Medicare recapture. By following a recent court decision and a reasonable interpretation of Medicare regulations, however, a facility may terminate an existing pension plan, purchase a group annuity contract, and reduce Medicare recapture. Two methods for treating termination of a plan are in line with Medicare rules. A facility considering termination should analyze the effects of both and use the method likely to produce a better financial result.

  3. NOW ON THE WEB SALES AND PURCHASE OF OBSOLETE OR SURPLUS EQUIPMENT

    CERN Multimedia

    2000-01-01

    The Recuperation and Sales Service wishes to recall that obsolete or surplus equipment which is no longer needed at CERN may be sold to outside institutes, members of the personnel, companies, etc. For this purpose an 'on-line sales and purchase tool' has been developed and installed on the web: consult the 'Recuperation and Sales Service' site on the CERN homepage. Users wishing to eliminate or sell obsolete or surplus equipment are invited to use the tool to issue an 'on-line sales request' and users who are looking for cheap 2nd hand equipment may consult the 'on-line sales catalogue' and make 'on-line purchase bids'. The direct sale of low value equipment, which takes place Thursdays 13h30 ­ 15h30 in the Recuperation Centre, building 133, will continue as before. For more information contact the Recuperation & Sales Service, tel. 75782 or 78665.

  4. Preliminary assessments the shortcut to remediation (category III-surplus facility assessments)

    International Nuclear Information System (INIS)

    Byars, L.L.

    1995-01-01

    This report presents the details of the preliminary assessments for the shortcut of decontamination of surplus nuclear facilities. Topics discussed include: environment, health and safety concerns; economic considerations; reduction of transition time; preliminary characterization reports; preliminary project plan; health and safety plan; quality assurance plan; surveillance and maintenance plan; and waste management plan

  5. 100 Area source operable unit focused feasibility study report. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    In accordance with the Hanford Past-Practice Strategy (HPPS), a focused feasibility study (FFS) is performed for those waste sites which have been identified as candidates for interim remedial measures (IRM) based on information contained in applicable work plans and limited field investigations (LFI). The FFS process for the 100 Area source operable units will be conducted in two stages. This report, hereafter referred to as the Process Document, documents the first stage of the process. In this stage, IRM alternatives are developed and analyzed on the basis of waste site groups associated with the 100 Area source operable units. The second stage, site-specific evaluation of the IRM alternatives presented in this Process Document, is documented in a series of operable unit-specific reports. The objective of the FFS (this Process Document and subsequent operable unit-specific reports) is to provide decision makers with sufficient information to allow appropriate and timely selection of IRM for sites associated with the 100 Area source operable units. Accordingly, the following information is presented: a presentation of remedial action objectives; a description of 100 Area waste site groups and associated group profiles; a description of IRM alternatives; and detailed and comparative analyses of the IRM alternatives

  6. 2014 Highlights of Ferry Operations in the United States

    Science.gov (United States)

    2016-05-01

    Based on information provided by operators who responded to the 2014 National Census of Ferry Operators (NCFO), the Bureau of Transportation Statistics (BTS) conservatively estimates that ferries in the United States carried just over 115 million pas...

  7. HDS unit revamp and operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Reinhardt, J. [Veba Oel Verarbeitungs-GmbH, Gelsenkirchen (Germany); Balfanz, U. [Aral Forschung, Gelsenkirchen (Germany); Dimmig, T. [TU Bergakademie Freiberg, Freiberg (Germany)

    2002-12-01

    Ruhr Oel GmbH, a joint venture between BP and PDVSA, operates a HDS unit at its Gelsenkirchen-Scholven site. The unit produces a major blend component for diesel fuel. Driven by ambitious German environmental policy and by an agreement between the German car and oil industries on the one hand and the government on the other, more stringent low sulphur fuel specifications will be enforced in Germany much earlier than in the rest of the European Union. In view of this situation a project was developed to fulfill the new product specifications with minimum investment. In a joint effort involving the refinery, the company research facilities and the catalyst supplier (AKZO NOBEL), pilot plant tests were performed to develop the best catalyst system and the new process conditions. Based on these results, an existing HDS unit was accordingly revamped. After the revamp, the unit produced diesel fuel with 50 ppm sulphur content and furthermore test runs at 10 ppm were carried out successfully. These results are displayed in this article. (orig.)

  8. The economics of power generation in Alberta : the pool price impact of Genesee Unit 3

    International Nuclear Information System (INIS)

    Topping, D.

    2003-01-01

    Alberta power pool prices for year 2000 were reviewed. The model assumptions were: studies based on PROSYM market simulations; base-load units offered at incremental cost; and, considerations in those cases where system gas units were modeled as coal units. The current situation in Alberta was reviewed. The Genesee 3 coal-fired facility is expected to be completed in the Winter 2004-2005 with an efficiency of 8 to 18 per cent better than other coal units. A graph was shown to examine the expected impact of Genesee 3 on Alberta prices. Electricity prices would increase during the period 2005-2008 without Genesee 3. Alberta prices are affected by factors such as: load-resource balance, fuel prices, cost of new capacity, offer strategy, available transmission, and tie lines. A capacity surplus is expected for the period 2003-2008. In addition, good correlation is expected for pool prices with gas prices. With Genesee 3 in operation, lower pool prices are expected in Alberta. figs

  9. Long-term criticality safety concerns associated with surplus fissile material disposition

    International Nuclear Information System (INIS)

    Choi, J.S.

    1995-01-01

    A substantial inventory of surplus fissile material would result from ongoing and planned dismantlement of US and Russian nuclear weapons. This surplus fissile material could be dispositioned by irradiation in nuclear reactors, and the resulting spent MOx fuel would be similar in radiation characteristics to regular LWR spent UO2 fuel. The surplus fissile material could also be immobilized into high-level waste forms, such as borosilicate glass, synroc, or metal-alloy matrix. The MOx spent fuel, or the immobilized waste forms, could then be directly disposed of in a geologic repository. Long-term criticality safety concerns arise because the fissile contents (i.e., Pu-239 and its decay daughter U-235) in these waste forms are higher than in LWR spent UO2 fuel. MOx spent fuel could contain 3 to 4 wt% of reactor-grade plutonium, compared to only 0.9 wt% of plutonium in LWR spent UO2 fuel. At some future time (tens of thousand of years), when the waste forms had deteriorated due to intruding groundwater, the water could mix with the long-lived fissile materials to form into a critical system. If the critical system is self-sustaining, somewhat like the natural-occurring reactor in OKLO, fission products produced could readily be available for dissolution and release out to the accessible environment, adversely affecting public health and safety. This paper will address ongoing activities to evaluate long-term criticality safety concerns associated with disposition of fissile material in a geologic setting. Issues to be addressed include the identification of a worst-case water-intrusion scenario and waste-form geometries which present the most concern for long-term criticality safety; and suggests of technical solutions for such concerns

  10. 26 CFR 1.593-2 - Additions to reserve for bad debts where surplus, reserves, and undivided profits equal or exceed...

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 7 2010-04-01 2010-04-01 true Additions to reserve for bad debts where surplus... bad debts where surplus, reserves, and undivided profits equal or exceed 12 percent of deposits or... profits, and reserves at the beginning of the taxable year, a reasonable addition to the reserve for bad...

  11. Phase 1 remedial investigation report for 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit

  12. Discussions on JNC roles and issues on management and disposition of surplus plutonium from the dismantlement of nuclear warhead

    International Nuclear Information System (INIS)

    2000-04-01

    Japan Nuclear Cycle Development Institute (JNC) and Russian Federation are now promoting the collaborative project to use the fast breeder reactor of BN-600 for the Russian surplus plutonium under the framework of the bilateral agreement on peaceful use of atomic energy. Based upon this background, JNC organized a study group to survey the world aspect on surplus plutonium resulting in START (Strategic Arms Reduction Treaty). The study group, including technical experts and also experts on international affairs, made a report after their survey and gave wide range discussion on various issues. The surplus plutonium of Russian Federation was estimated to be 102 - 136 tones. There were shortages of back end technologies in Russian infrastructures for dismantling, reprocessing and disposition of the surplus plutonium. A supporting leadership of USA to Russian Federation met some difficulties due to the strategic gap between both countries. One of the examples is the temporal evolution of USA attitude toward the CANDU (thermal power reactors of Canadian design characterized by heavy water moderator, pressure tube construction, and on-power refuelling) option to use surplus plutonium as MOX (Mixed OXide) fuels. Additional supports from the G8 (Group of eight) countries except USA and Russian Federation came up to their expectation. For examples, the joint group of French, German and Russian is promoting DEMOX (Demonstration of MOX fuel) project but is on the way to discussion depending on various thoughts about mutual benefits. Many issues remained in joint project with CIS (Commonwealth of Independent States), such as safeguard, nonproliferation, energy supply and demand, and environmental impacts. In addition, public opinions will give some impacts to policy makers, especially in USA. This report had analyzed many viewpoints for technical and political issues on surplus plutonium in the world, and pointed out consequences, merits and demerits after possible many

  13. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  14. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy`s (DOE`s) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement.

  15. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    International Nuclear Information System (INIS)

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy's (DOE's) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement

  16. Preparation status for continuous operation of Kori unit 1 NPP in Korea

    International Nuclear Information System (INIS)

    Choi, C.H. . E-mail : chechee@khnp.co.kr

    2005-01-01

    Kori unit 1 Nuclear Power Plant is the first commercial operation plant in Korea. In Korea, the life extension of NPP beyond design lifetime reached practically application stage. Preparations status for continuous operation of Kori unit 1, Many researches have demonstrated that life extension beyond design lifetime is possible in terms of technology. This paper is to introduce and to share the continuous operation preparations status and schedule for Kori unit 1 License Renewal Process an additional every 10 years beyond the design life 30 years term. (author)

  17. Biblis 1,300 MW unit B in operation for thirty years

    International Nuclear Information System (INIS)

    Lauer, H.

    2006-01-01

    Over the past thirty years, unit B of the Biblis nuclear power station has contributed towards safe, reliable and non-polluting electricity generation. Unit B was the first 1,300 MW unit in the world confirming the good experience accumulated in the construction and operation of plants this size. It laid the foundation for the advanced development of nuclear power plants up to the convoy line. The good availability this plant has achieved in its operating cycles proves the mature state of technology and the high level of qualification and motivation of the power plant staff and the personnel of external firms contracted to work for Biblis. Biblis B has served as a reference plant in German nuclear safety research, demonstrating that units this size can be operated safely. Unit B is also living proof of the possibility to raise nuclear power plants built in the seventies to the current state of the art by implementing the appropriate backfitting and modernization measures. Today, Biblis B is operated at a safety level clearly higher than that to be achieved for new plants internationally. This is also evident from comparison with the guiding values for the safety of new facilities as published by the International Atomic Energy Agency (IAEA). (orig.)

  18. Expert system for operational personnel support during power unit operation control in regulation range

    International Nuclear Information System (INIS)

    Yanitskij, V.A.

    1992-01-01

    The problems met when developing the systems for NPP operator support in the process of power unit operation are considered. The expert system for NPP personnel intelligent support combining the properties belonging to the artificial intelligence systems including selection of the analysis method taking into account the concrete technological situation and capability of application of algothmic calculations of the equipment characteristics using the information accumulated during the system development, erection and operation is described

  19. The Traders' Cross: Identifying Traders' Surpluses in the Traditional Edgeworth Exchange Diagram

    Science.gov (United States)

    Beaulier, Scott A.; Prychitko, David L.

    2010-01-01

    The Edgeworth exchange diagram is a traditional tool of undergraduate microeconomic theory that depicts the mutually beneficial gains from voluntary trade. The authors take the analysis one step further. They identify the buyer's and seller's surpluses that accrue to both trading parties in the Edgeworth diagram. This is a straightforward exercise…

  20. Surplus N in US maize production: Informing data-driven policies using the Adapt-N model

    Science.gov (United States)

    Sela, Shai; van-Es, Harold; McLellan, Eileen; Margerison, Rebecca; Melkonian, Jeff

    2016-04-01

    Maize (Zea mays L.) production accounts for the largest share of crop land area in the U.S, and is the largest consumer of nitrogen (N) fertilizers of all US crops. Over-application of N fertilizer in excess of crop needs often lead to surplus of N in the soil, resulting in well-documented environmental problems and social costs associated with high reactive N losses. There is a potential to reduce these costs through better application timing, use of enhanced efficiency products, and more precise rate calculations. However, promoting management changes by means of environmental policies requires robust analysis of the possible environmental outcomes associated with these policies. This research gap is addressed using Adapt-N, a computational tool that combines soil, crop and management information with near-real-time weather data to estimate optimum N application rates for maize. Using results from a large synthetic dataset of 8100 simulations spanning 6 years (2010-2015), we have explored the total applied N rates, surplus of N (total N applied minus N removed by the crop) and the environmental losses resulting from seven N management scenarios applied in the top 5 US maize production states - IL, IN, IA, MN and NE. To cover a wide range of weather and production environments, all scenarios were applied at five randomly selected locations in each state, using combinations of three soil texture classes and two organic matter contents. The results indicate that fall applications typically lead to the highest total amount of N applied, highest N surplus and substantial amounts of environmental N losses. Nitrification inhibitors were found to have a marginal benefits for fall applied N. Spring pre-plant N applications were found to have lower N surplus than fall applications, but could still lead to high N losses under wet spring conditions. These losses were reduced (12%) when nitrification and urease inhibitors were applied. Out of all simulated N management

  1. Stability Analysis for Operation of DG Units in Smart Grids

    DEFF Research Database (Denmark)

    Pouresmaeil, Edris; Shaker, Hamid Reza; Mehrasa, Majid

    2015-01-01

    This paper presents a multifunction control strategy for the stable operation of Distributed Generation (DG) units during grid integration. The proposed control model is based on Direct Lyapunov Control (DLC) theory and provides a stable region for the appropriate operation of DG units during grid....... Application of this concept can guarantee to reduce the stress on the grid during the energy demand peak. Simulation results are presented to demonstrate the proficiency and performance of the proposed DLC technique in DG technology....

  2. Implementation of Active Learning Method in Unit Operations II Subject

    OpenAIRE

    Ma'mun, Sholeh

    2018-01-01

    ABSTRACT: Active Learning Method which requires students to take an active role in the process of learning in the classroom has been applied in Department of Chemical Engineering, Faculty of Industrial Technology, Islamic University of Indonesia for Unit Operations II subject in the Even Semester of Academic Year 2015/2016. The purpose of implementation of the learning method is to assist students in achieving competencies associated with the Unit Operations II subject and to help in creating...

  3. Decommissioning strategy of the operating WWER type units in the Ukraine

    International Nuclear Information System (INIS)

    Litvinsky, L.L.; Lobach, Yu.N.; Skripov, A.E.

    2002-01-01

    At present in Ukraine, 13 WWER type units are in operation and two other ones are in the final stage of construction. Decommissioning of these units is expected after the year 2010. General planning of their decommissioning is developed in the framework of the decommissioning strategy of operating WWER type units. The strategy contains the objectives, principles and main tasks of the decommissioning as well as the activities at each phase of decommissioning. It is considered a broad range of factors important for the planning and implementation of decommissioning. (author)

  4. What is to be done with surplus embryos? Attitude formation with ambivalence in German fertility patients.

    Science.gov (United States)

    Kufner, K; Tonne, M; Barth, J

    2009-01-01

    Improved pregnancy rates in IVF have led to increasing numbers of surplus embryos which can potentially be used for purposes like donation to another infertile couple or further research. Individuals report high levels of ambivalence concerning the donation of surplus embryos. This study examined which strategies infertile patients use to deal with this ambivalence when asked to evaluate potential dispositions of surplus embryos created during IVF. Guideline-based interviews with fertility patients were audio-recorded and transcribed verbatim. Following the principle of theoretical sampling, eight interviews were analysed by use of Grounded Theory. Analyses focused on processes of individual attitude formation. Strategies for handling ambivalence during attitude formation were identified: the six strategies comprise cognitive and communicative strategies, and were integrated into a model of attitude formation under ambivalence. As ambivalence is a relevant phenomenon in attitude formation within IVF treatment, assessment of ambivalence is strongly recommended in social science studies investigating ethical problems in patient care. In the context of informed consent, there is a need for individual counselling which draws attention to the conflicting values during attitude formation. Counsellors should be aware of the signs of and the strategies to deal with ambivalence.

  5. 34 CFR 12.5 - Who may apply for surplus Federal real property?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Who may apply for surplus Federal real property? 12.5 Section 12.5 Education Office of the Secretary, Department of Education DISPOSAL AND UTILIZATION OF... Federal real property: (a) A State. (b) A political subdivision or instrumentality of a State. (c) A tax...

  6. Trust and Exchange : Effects of TemporalTrust and Exchange : Effects of Temporal Embeddedness and Network Embeddedness on Providing and Dividing a Surplus

    NARCIS (Netherlands)

    Gautschi, T.

    2002-01-01

    Mutually profitable cooperation is characterized by the fact that the combined efforts of the cooperating parties generate a certain surplus. The first part of the book studies the production of a surplus as a trust problem between two actors. Should an actor provide resources if the other actor

  7. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

  8. Preparing nuclear power plant units for operation

    International Nuclear Information System (INIS)

    Hudcovic, R.; Telgarsky, K.; Kmosena, J.

    1984-01-01

    The factors are listed which have to be taken into consideration for planning the unit operation, i.e., the implementation of planned repairs, checks of equipment and refuellings. All basic input data were evaluated as the basic for drawing up the schedule of routine repairs and overhauls for the coming period. (E.S.)

  9. Nurse managers' decision-making in daily unit operation in peri-operative settings: a cross-sectional descriptive study.

    Science.gov (United States)

    Siirala, Eriikka; Peltonen, Laura-Maria; Lundgrén-Laine, Heljä; Salanterä, Sanna; Junttila, Kristiina

    2016-09-01

    To describe the tactical and the operational decisions made by nurse managers when managing the daily unit operation in peri-operative settings. Management is challenging as situations change rapidly and decisions are constantly made. Understanding decision-making in this complex environment helps to develop decision support systems to support nurse managers' operative and tactical decision-making. Descriptive cross-sectional design. Data were collected from 20 nurse managers with the think-aloud method during the busiest working hours and analysed using thematic content analysis. Nurse managers made over 700 decisions; either ad hoc (n = 289), near future (n = 268) or long-term (n = 187) by nature. Decisions were often made simultaneously with many interruptions. Ad hoc decisions covered staff allocation, ensuring adequate staff, rescheduling surgical procedures, confirmation tangible resources and following-up the daily unit operation. Decisions in the near future were: planning of surgical procedures and tangible resources, and planning staff allocation. Long-term decisions were: human recourses, nursing development, supplies and equipment, and finances in the unit. Decision-making was vulnerable to interruptions, which sometimes complicated the managing tasks. The results can be used when planning decision support systems and when defining the nurse managers' tasks in peri-operative settings. © 2016 John Wiley & Sons Ltd.

  10. Fueling the dragon: Alternative Chinese oil futures and their implications for the United States

    Science.gov (United States)

    Eberling, George G.

    This study examines how Chinese oil energy will likely shape future Sino-American relations under conditions of dependency and non-dependency. The study will list and describe three possible Chinese oil energy futures or scenarios (Competitive Dependency, Competitive Surplus and Cooperative Surplus) using Scenario Analysis to subsequently estimate their associated likelihoods using the PRINCE forecasting system and discuss and evaluate their strategic implications for the United States. Further, this study will determine the most likely oil energy future or scenario. Finally, the study will list and describe the most likely United States political, economic and/or military policy responses for each future or scenario. The study contributes to the literature on Chinese and United States energy security, foreign policy, political economy and political risk analysis by showing how China will most likely address its growing oil energy dependence and by determining what will be the most likely U.S. foreign policy consequences based on the most current literature available on energy security and foreign policy.

  11. Current Account Surpluses and the Interest Rate Island in Switzerland

    OpenAIRE

    Paolo Mauro

    1995-01-01

    This paper describes some long-run aspects of the Swiss balance of payments, highlighting two macroeconomic phenomena that make Switzerland stand out among other countries: first, it has had a persistent current account surplus and the largest ratio of net foreign assets to GDP in the world; second, its real interest rates have been significantly lower than those of most other industrialized countries, earning it the label “interest rate island”. These two distinctive features may be related,...

  12. Gas power production, surplus concepts and the transformation of hydro-electric rent into resource rent

    International Nuclear Information System (INIS)

    Amundsen, Eirik S.

    1997-01-01

    The paper considers the effects of introducing large scale gas power production capacity into an electricity sector based on hydropower. In this process the economic rent is transmitted from the hydro power sector to the resource rent in the gas power sector, but is along the way intermingled with ordinary producer surplus and quasi-rent stemming from increasing cost conditions in the production infrastructure and capacity constraints. The net effect on total rent generated depends on development in demand, demand elasticities, costs saved from delaying hydropower projects and the existence of producer surplus in gas power generation. The paper closes with a discussion of possible tax base changes following from the introduction of a thermal power system based on natural gas

  13. Prospects and requirements for an operational modelling unit in flood crisis situations

    Directory of Open Access Journals (Sweden)

    Anders Katharina

    2016-01-01

    Full Text Available Dike failure events pose severe flood crisis situations on areas in the hinterland of dikes. In recent decades the importance of being prepared for dike breaches has been increasingly recognized. However, the pre-assessment of inundation resulting from dike breaches is possible only based on scenarios, which might not reflect the situation of a real event. This paper presents a setup and workflow that allows to model dike breachinduced inundation operationally, i.e. when an event is imminent or occurring. A comprehensive system setup of an operational modelling unit has been developed and implemented in the frame of a federal project in Saxony-Anhalt, Germany. The modelling unit setup comprises a powerful methodology of flood modelling and elaborated operational guidelines for crisis situations. Nevertheless, it is of fundamental importance that the modelling unit is instated prior to flood events as a permanent system. Moreover the unit needs to be fully integrated in flood crisis management. If these crucial requirements are met, a modelling unit is capable of fundamentally supporting flood management with operational prognoses of adequate quality even in the limited timeframe of crisis situations.

  14. 77 FR 62247 - Dynamic Positioning Operations Guidance for Vessels Other Than Mobile Offshore Drilling Units...

    Science.gov (United States)

    2012-10-12

    ... Operations Guidance for Vessels Other Than Mobile Offshore Drilling Units Operating on the U.S. Outer... ``Mobile Offshore Drilling Unit Dynamic Positioning Guidance''. The notice recommended owners and operators of Mobile Offshore Drilling Units (MODUs) follow Marine Technology Society (MTS) Dynamic Positioning...

  15. Thunderstorm Algorithm for Determining Unit Commitment in Power System Operation

    Directory of Open Access Journals (Sweden)

    Arif Nur Afandi

    2016-12-01

    Full Text Available Solving the unit commitment problem is an important task in power system operation for deciding a balanced power production between various types of generating units under technical constraints and environmental limitations. This paper presents a new intelligent computation method, called the Thunderstorm Algorithm (TA, for searching the optimal solution of the integrated economic and emission dispatch (IEED problem as the operational assessment for determining unit commitment. A simulation using the IEEE-62 bus system showed that TA has smooth convergence and is applicable for solving the IEED problem. The IEED’s solution is associated with the total fuel consumption and pollutant emission. The proposed TA method seems to be a viable new approach for finding the optimal solution of the IEED problem.

  16. Optimal operation of cogeneration units. State of art and perspective

    International Nuclear Information System (INIS)

    Polimeni, S.

    2001-01-01

    Optimal operation of cogeneration plants and of power plant fueling waste products is a complex challenge as they have to fulfill, beyond the contractual obligation of electric power supply, the constraints of supplying the required thermal energy to the user (for cogeneration units) or to burn completely the by-products of the industrial complex where they are integrated. Electrical power market evolution is pushing such units to a more and more volatile operation caused by uncertain selling price levels. This work intends to pinpoint the state of art in the optimization of these units outlining the important differences among the different size and cycles. The effect of the market liberalization on the automation systems and the optimization algorithms will be discussed [it

  17. Analysis of Fukushima unit 2 accident considering the operating conditions of RCIC system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Il, E-mail: sikim@kaeri.re.kr; Park, Jong Hwa; Ha, Kwang Soon; Cho, Song-Won; Song, JinHo

    2016-03-15

    Highlights: • Fukushima unit 2 accident was analyzed using MELCOR 1.8.6. • RCIC operating conditions were assumed and best case was selected. • Effect of RCIC operating condition on accident scenario was found. - Abstract: A severe accident in Fukushima occurred on March 11, 2011 and units 1, 2 and 3 were damaged severely. A tsunami following an earthquake made the supply of electricity power stop, and the safety systems, which use AC or DC power in plants could not operate properly. It is supposed that the degree of core degradation of unit 2 is less serious than in the other plants, and it was estimated that the operation of reactor core isolation cooling (RCIC) system at the initial stage of the accident minimized the core damage through decay heat removal. Although the operating conditions of the RCIC system are not known clearly, it can be important to analyze the accident scenario of unit 2. In this study, best case of the Fukushima unit 2 accident was presented considering the operating conditions of the RCIC system. The effects of operating condition on core degradation and fission product release rate to environment were also examined. In addition, importance of torus room flooding level in the accident analysis was discussed. MELCOR 1.8.6 was used in this research, and the geometries of plant and operating conditions of safety system were obtained from TEPCO through OECD/NEA BSAF Project.

  18. Structural characterization and condition for measurement statistics preservation of a unital quantum operation

    International Nuclear Information System (INIS)

    Lee, Kai-Yan; Fung, Chi-Hang Fred; Chau, H F

    2013-01-01

    We investigate the necessary and sufficient condition for a convex cone of positive semidefinite operators to be fixed by a unital quantum operation ϕ acting on finite-dimensional quantum states. By reducing this problem to the problem of simultaneous diagonalization of the Kraus operators associated with ϕ, we can completely characterize the kinds of quantum states that are fixed by ϕ. Our work has several applications. It gives a simple proof of the structural characterization of a unital quantum operation that acts on finite-dimensional quantum states—a result not explicitly mentioned in earlier studies. It also provides a necessary and sufficient condition for determining what kind of measurement statistics is preserved by a unital quantum operation. Finally, our result clarifies and extends the work of Størmer by giving a proof of a reduction theorem on the unassisted and entanglement-assisted classical capacities, coherent information, and minimal output Renyi entropy of a unital channel acting on a finite-dimensional quantum state. (paper)

  19. Limited field investigation report for the 100-KR-4 Operable Unit

    International Nuclear Information System (INIS)

    1994-07-01

    This limited field investigation (LFI) was conducted to optimize the use of interim remedial measures (IRM) for expediting clean up while maintaining a technically sound and cost-effective program. The 100-KR-4 Operable Unit is one of four operable units associated with the 100 K Area. Operable units KR-1, KR-2 and KR-3 address contaminant sources while 100-KR-4 addresses contamination present in the underlying groundwater. The IRM decision process for groundwater operable units is based on three aspects: (1) Is the concentration greater than Hanford background? (2) Does the concentration present a medium or high human-health risk? (3) Does the concentration exceed an ecologically based applicable, relevant and appropriate requirements (ARAR) or present an environmental hazard quotient > I? The primary methods of investigation used during this LFI were the installation of monitoring wells and sampling of groundwater. The samples collected from the groundwater and soils were submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the location and degree of contamination. All soil samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all first round and a minimum of 10% of subsequent round data were validated

  20. Limited field investigation report for the 100-DR-1 Operable Unit

    International Nuclear Information System (INIS)

    1994-06-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-DR-1 Source Operable Unite LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. The 100-DR-1 Operable Unit is one of four operable units associated with the 100 D/DR Area at the Hanford Site. The 100-DR-1 Operable Unit encompasses approximately 1.5 km 2 (0.59 mi 2 ) and is located immediately adjacent to the Columbia River shoreline. In general, it contains waste facilities associated with the original plant facilities constructed to support D Reactor facilities, as well as cooling water retention basin systems for both D and DR Reactors. The 100-DR-1 LFI began the investigative phase of the remedial investigation for a select number of high-priority sites. The LFI was performed to provide additional data needed to support selection, design and implementation of IRM, if needed. The LFI included data compilation, nonintrusive investigations, intrusive investigations, summarization of 100 Area aggregate studies, and data evaluation

  1. Integrated Ground Operations Demonstration Units Testing Plans and Status

    Science.gov (United States)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  2. Operational strategy and marginal costs in simple trigeneration systems

    International Nuclear Information System (INIS)

    Lozano, M.A.; Carvalho, M.; Serra, L.M.

    2009-01-01

    As a direct result of economic pressures to cut expenses, as well as the legal obligation to reduce emissions, companies and businesses are seeking ways to use energy more efficiently. Trigeneration systems (CHCP: Combined Heating, Cooling and Power generation) allow greater operational flexibility at sites with a variable demand for energy in the form of heating and cooling. This is particularly relevant in buildings where the need for heating is restricted to a few winter months. In summer, the absorption chillers make use of the cogenerated heat to produce chilled water, avoiding waste heat discharge. The operation of a simple trigeneration system is analyzed in this paper. The system is interconnected to the electric utility grid, both to receive electricity and to deliver surplus electricity. For any given demand required by the users, a great number of operating conditions are possible. A linear programming model provides the operational mode with the lowest variable cost. A thermoeconomic analysis, based on marginal production costs, is used to obtain unit costs for internal energy flows and final products as well as to explain the best operational strategy as a function of the demand for energy services and the prices of the resources consumed. (author)

  3. Demographic perspectives on agrarian transformations and 'surplus populations': supply-side banalities versus redistributive imperatives

    NARCIS (Netherlands)

    A.M. Fischer (Andrew Martín)

    2011-01-01

    textabstractThis paper frames the discussion of agrarian transformations and 'surplus populations' in the Global South within a political economy and macro-structural consideration of the developmental challenges faced in the context of contemporary rapid population growth. The case is made that the

  4. Macroeconomic impacts of bioenergy production on surplus agricultural land: a case study of Argentina

    NARCIS (Netherlands)

    Wicke, B.|info:eu-repo/dai/nl/306645955; Smeets, E.M.W.|info:eu-repo/dai/nl/311445217; Tabeau, A.; Hilbert, J.; Faaij, A.P.C.|info:eu-repo/dai/nl/10685903X

    2009-01-01

    This paper assesses the macroeconomic impacts in terms of GDP, trade balance and employment of large-scale bioenergy production on surplus agricultural land. An input–output model is developed with which the direct, indirect and induced macroeconomic impacts of bioenergy production and agricultural

  5. Macroeconomic impacts of bioenergy production on surplus agricultural land—A case study of Argentina

    NARCIS (Netherlands)

    Wicke, Birka; Smeets, E.; Tabeau, Andrzej; Hilbert, Jorge; Faaij, André

    2009-01-01

    This paper assesses the macroeconomic impacts in terms of GDP, trade balance and employment of large-scale bioenergy production on surplus agricultural land. An input–output model is developed with which the direct, indirect and induced macroeconomic impacts of bioenergy production and agricultural

  6. The approaching plutonium surplus: a Japanese/European predicament

    International Nuclear Information System (INIS)

    Berkhout, F.; Suzuki, Tatsujiro; Walker, W.

    1990-01-01

    The vision of cheap energy independence through civil nuclear power has faded in the late 1980s as the costs of nuclear programmes have come to light. But present nuclear plans in Japan, France and Britain are set to produce quantities of plutonium in the 1990s which, the authors argue, will be surplus to requirements and very difficult to use. The over-production of plutonium will pose political and security problems - particularly for Japan, which owns large stocks of separated plutonium in Europe that it may not be able to bring back home. Nuclear strategy in Japan and Europe needs to be rethought if serious international problems are to be avoided. (author)

  7. Operating experience with unit for sulfuric acid alkylation of isobutane by butylenes

    Energy Technology Data Exchange (ETDEWEB)

    Tagavov, I.T.; Sumanov, V.T.; Khadzhiev, S.N.

    1988-09-01

    The operation of units for the sulfuric acid alkylation of isobutanes by butylenes have been performed. The reaction was carried out in a KSG-3 horizontal sulfuric acid contractor. A butane-butylene fraction from catalytic cracking and an isobutane fraction from the central gas fractionating unit were used as a feedstock. The studies have shown that the unit will give a high-quality product under various conditions of operation. The specific consumption of sulfuric acid in processing different types of feed remains within acceptable limits.

  8. Robust Multi-unit Auction Protocol against False-name Bids

    Science.gov (United States)

    Yokoo, Makoto; Sakurai, Yuko; Matsubara, Shigeo

    This paper presents a new multi-unit auction protocol (IR protocol) that is robust against false-name bids. Internet auctions have become an integral part of Electronic Commerce and a promising field for applying agent and Artificial Intelligence technologies. Although the Internet provides an excellent infrastructure for executing auctions, the possibility of a new type of cheating called false-name bids has been pointed out. A false-name bid is a bid submitted under a fictitious name. A protocol called LDS has been developed for combinatorial auctions of multiple different items and has proven to be robust against false-name bids. Although we can modify the LDS protocol to handle multi-unit auctions, in which multiple units of an identical item are auctioned, the protocol is complicated and requires the auctioneer to carefully pre-determine the combination of bundles to obtain a high social surplus or revenue. For the auctioneer, our newly developed IR protocol is easier to use than the LDS, since the combination of bundles is automatically determined in a flexible manner according to the declared evaluation values of agents. The evaluation results show that the IR protocol can obtain a better social surplus than that obtained by the LDS protocol.

  9. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. Shanklin

    2006-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003

  10. Limited field investigation report for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-09-01

    This limited field investigation (LFI) was conducted to assess the applicability of interim remedial measures (IRM) for reducing human health and environmental risks within the 100-HR-3 Groundwater Operable Unit. The 100-HR-3 Operable Unit is comprised of three subareas; the 100 D Area, the 100 H Area and those portions of the 600 Area between the two reactor areas. The operable unit is one of seven operable units associated with the 100 D and H Areas. Operable units 100-DR-1, 100-DR-2, 100-DR-3, 100-HR-1, 100-HR-2 and 100-IU-4 address contaminant sources while 100-HR-3 addresses contamination present in the underlying groundwater. The primary method of field investigation used during this LFI was the installation and sampling of monitoring wells. Samples were collected from the groundwater and soils, and submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the locations and levels of contaminants. All samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all round one, two and three and a minimum of 10% of round four data associated with the LFI were validated. A screening method was used to identify contaminants of potential concern (COPC). This screening method eliminated from further consideration, constituents that were below background. Constituents which are considered non-toxic to humans were eliminated from the human health evaluation. Data consistency and blank contamination were also evaluated in the screening process. These COPC were then evaluated further in the qualitative risk assessment (QRA). A human health QRA was performed using conservative (maximum equilibrated contaminant levels from the LFI) analyses

  11. Limited field investigation report for the 100-HR-2 Operable Unit

    International Nuclear Information System (INIS)

    1994-09-01

    This report summarizes the data collection and analysis activities conducted during the 100-HR-2 Operable Unit investigative phase and the associated qualitative risk assessment (QRA). The 100-HR-2 Operable Unit contains solid waste burial grounds, an ash pit, bum pits, electrical facilities, septic systems, and support facilities. All known and suspected areas of contamination were classified as solid waste burial grounds or low-priority waste sites based on the collective knowledge of the operable unit managers (representatives from the US Department of Energy [DOE], the US Environmental Protection Agency [EPA], and Washington Department of Ecology [Ecology]) during the preparation of the 100-HR-2 Operable Unit work plan (DOE/RL 1993f). Solid waste burial grounds were judged to pose sufficient risk(s), through one or more pathways, to require evaluation for an interim remedial measure (IRM) as per the Hanford Past-Practice Strategy (HPPS) (DOE/RL 1991) and negotiations with DOE, EPA, and Ecology. An IRM is intended to achieve remedies that are likely to lead to a final record of decision. Low-priority sites are those judged not to pose significant risk to require the streamlined evaluation. There were six low-priority waste sites and seven solid waste burial grounds identified. The investigative phase was conducted in accordance with the RCRA Facility Investigation/Corrective Measures Study Work Plan for the 100-HR-2 Operable Unit (DOE/RL 1993f). The QRA was performed in accordance with the Hanford Site Baseline Risk Assessment Methodology (DOE/RL 1993b) and the recommendations incorporate the strategies of the HPPS. The purpose of this report is to: (1) provide a summary of site investigative activities; (2) refine the conceptual exposure model (as needed); (3) identify chemical- and location-specific corrective action requirements; and (4) provide a human health and ecological QRA associated with solid waste burial grounds

  12. Safe disposal of surplus plutonium

    Science.gov (United States)

    Gong, W. L.; Naz, S.; Lutze, W.; Busch, R.; Prinja, A.; Stoll, W.

    2001-06-01

    About 150 tons of weapons grade and weapons usable plutonium (metal, oxide, and in residues) have been declared surplus in the USA and Russia. Both countries plan to convert the metal and oxide into mixed oxide fuel for nuclear power reactors. Russia has not yet decided what to do with the residues. The US will convert residues into a ceramic, which will then be over-poured with highly radioactive borosilicate glass. The radioactive glass is meant to provide a deterrent to recovery of plutonium, as required by a US standard. Here we show a waste form for plutonium residues, zirconia/boron carbide (ZrO 2/B 4C), with an unprecedented combination of properties: a single, radiation-resistant, and chemically durable phase contains the residues; billion-year-old natural analogs are available; and criticality safety is given under all conceivable disposal conditions. ZrO 2/B 4C can be disposed of directly, without further processing, making it attractive to all countries facing the task of plutonium disposal. The US standard for protection against recovery can be met by disposal of the waste form together with used reactor fuel.

  13. Radioactive acid digestion test unit nonradioactive startup operations

    International Nuclear Information System (INIS)

    Allen, C.R.; Cowan, R.G.; Crippen, M.D.; Divine, J.R.

    1978-05-01

    The Radioactive Acid Digestion Test Unit (RADTU) will process 5 kg/hour of combustible solid waste and is designed to handle almost all solid combustible waste found in plutonium processing with plutonium contamination levels up to scrap. The RADTU is designed with special safety features to safely contain high masses of fissile materials and to safely handle unusual materials and reactive chemicals which may find their way into the waste. Nonradioactive operating experience to date has been very satisfactory. RADTU has been operated for extended runs on both a 24-hour per day basis as well as on a one shift per day basis. Some minor operating problems have been encountered as expected in a shakedown operation. In general, solutions to these have been readily found. 12 figures

  14. Analysis of long-time operation of micro-cogeneration unit with fuel cell

    Directory of Open Access Journals (Sweden)

    Patsch Marek

    2015-01-01

    Full Text Available Micro-cogeneration is cogeneration with small performance, with maximal electric power up to 50 kWe. On the present, there are available small micro-cogeneration units with small electric performance, about 1 kWe, which are usable also in single family houses or flats. These micro-cogeneration units operate on principle of conventional combustion engine, Stirling engine, steam engine or fuel cell. Micro-cogeneration units with fuel cells are new progressive developing type of units for single family houses. Fuel cell is electrochemical device which by oxidation-reduction reaction turn directly chemical energy of fuel to electric power, secondary products are pure water and thermal energy. The aim of paper is measuring and evaluation of operation parameters of micro-cogeneration unit with fuel cell which uses natural gas as a fuel.

  15. Disposition and transportation of surplus radioactive low specific activity nitric acid. Volume 1, Environmental Assessment

    International Nuclear Information System (INIS)

    1995-05-01

    DOE is deactivating the PUREX plant at Hanford; this will involve the disposition of about 692,000 liters (183,000 gallons) of surplus nitric acid contaminated with low levels of U and other radionuclides. The nitric acid, designated as low specific activity, is stored in 4 storage tanks at PUREX. Five principal alternatives were evaluated: transfer for reuse (sale to BNF plc), no action, continued storage in Hanford upgraded or new facility, consolidation of DOE surplus acid, and processing the LSA nitric acid as waste. The transfer to BNF plc is the preferred alternative. From the analysis, it is concluded that the proposed disposition and transportation of the acid does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of NEPA; therefore an environmental impact statement is not required

  16. Multipurpose units: combining of technological operations of a soil cultivating and seeding

    Directory of Open Access Journals (Sweden)

    D. A. Petukhov

    2015-01-01

    Full Text Available The modern domestic market of technique for grain crops seeding differs variety of machines brands and types. The intensive type technologies combining technological operations of a soil cultivating and grain crops seeding in one pass are more widely used. The authors have established that one-operational units in new machine park have to be replaced multipurpose, universal and combined machines. Such approach will reduce number of machines in grain production from 20-30 to 5-6 name titles. Possibilities of multipurpose sowing units for simultaneous fertilizers application, soil cultivating and weeds destruction were analyzed. It was specified that nowadays there are several technologies types with two, four or six operations overlapping. Operational performance, technological and economical efficiency of the best multipurpose and also efficiency of technological operations overlapping at grain crops cultivating in the conditions of their real operation and at a trial establishment in the Kuban research institute of information and technical and economic studies of agro-industrial complex engineering and technical services were studied. Tit was defined that use of multipurpose sowing units and also studied efficiency of decreases operational costs by 48-71 percent, fuel consumption - by 41-76 percent and reduces labor input by 72-80 percent. Thus grain crops seeding is possible in optimal agrotime because of 4-6 technological operations overlapping in one pass.

  17. Optimization of Surplus Reinsurance Treaty using the Conditional Tail Expectation

    Directory of Open Access Journals (Sweden)

    Abderrahim El Attar

    2018-03-01

    Full Text Available In this work, we propose a new optimization strategy for reinsurance using the genetic algorithms. This approach is to determine an optimal structure of a "surplus" reinsurance contract by finding the optimal cession rates through an optimization model which is based on the minimization of the Conditional Tail Expectation (CTE risk measure under the constraint of technical benefit. This approach can be seen as a decision support tool that can be used by managers to minimize the actuarial risk and maximize the technical benefit in the insurance company.

  18. Joint Inventory, Pricing, and Advertising Decisions with Surplus and Stockout Loss Aversions

    Directory of Open Access Journals (Sweden)

    Bing-Bing Cao

    2016-01-01

    Full Text Available The newsvendor models considering decision-makers’ behavioral factors remain a fruitful research area in operation management field in past decade. In this paper, we further extend the current literatures to look into joint inventory, pricing, and advertising decisions considering loss aversion effects under the newsvendor setting. The purpose is to explore how the loss aversions affect the optimal policy of order quantity, price, and advertising effort level. We present an integrated utility model to measure both economic payoff and loss aversion utility of the newsvendor, where surplus loss aversion and stockout loss aversion are first separately defined and quantified. Then, we analyze the optimal solution conditions of the integrated model under exogenous and endogenous price cases, respectively. Under exogenous price case, we find that the uniquely optimal policy exists and is presented in the closed form. Under endogenous price case, the optimal policy is determined under mild conditions; we also provide the solutions when order quantity factor or advertising effort level is fixed in this case. In addition, the sensitivity analysis shows that the loss aversions affect the optimal decisions of order quantity, price, and advertising effort level in a systematic way.

  19. Habit Formation, Surplus Consumption and Return Predictability: International Evidence

    DEFF Research Database (Denmark)

    Engsted, Tom; Hyde, Stuart; Møller, Stig V.

    On an international post World War II dataset, we use an iterated GMM pro- cedure to estimate and test the Campbell-Cochrane (1999) habit formation model. In addition, we analyze the predictive power of the surplus consumption ratio for future asset returns. We find that, although...... there are important cross-country differences, for the majority of countries in our sample the model gets empirical support in a variety of diffrent dimensions, including reasonable estimates of risk- free rates, and the model dominates the time-separable power utility model in terms of pricing errors. Further...... ratio is also a powerful predictor of future bond returns....

  20. Study about hydrogen and methanation as power surplus valorization process

    International Nuclear Information System (INIS)

    2014-09-01

    The purpose of this study is to examine the use of technologies that allow converting power into gas as ways of providing added value to power surpluses. In the Anglo-Saxon world, and in numerous other countries, this concept is known as Power-to-Gas (PtG or P2G). The massive integration of fluctuating renewable energy sources ((wind and photovoltaic principally) into electricity systems implies more and more time periods during which production will exceed consumption. The volumes at stake could surpass the conventional capacities of flexibility and storage of the electricity system: the conversion into another energy carrier therefore appears as a solution for giving value to these surpluses. As the basic technology of Power-to-Gas, electrolysis converts electrical energy into chemical energy in the form of hydrogen gas (H2), by separating molecules of water (H 2 O). The gas produced can be used on-site in different manners, for example by a manufacturer for it's own process needs or by a filling station for hydrogen-fuelled vehicles (fuel-cell motorisation), or it can be stored locally for being later converted back into power through a fuel-cell. However it can also be directly injected into the gas distribution or transmission networks, thus creating a coupling of various energy networks and carriers: in this way the possibilities to create added-value from power surpluses are significantly increased and diversified both in terms of final use as well as across a scope of time and space. The development of Power-to-Gas can be summarized in three key steps. In the short to mid-term, hydrogen represents, when incorporated into the gas network in limited proportions (a few %) and/or used directly in some niche markets (particularly via fuel cells) a way to provide added value to substantial renewable electricity surpluses.. In the longer term, a transition toward synthetic methane production would allow to overcome all technical barriers linked with gas

  1. Phase 1 remedial investigation report for 200-BP-1 operable unit. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit.

  2. Pressure Swing Adsorption in the Unit Operations Laboratory

    Science.gov (United States)

    Ganley, Jason

    2018-01-01

    This paper describes a student laboratory in the Unit Operations Laboratory at the Colorado School of Mines: air separation by pressure swing adsorption. The flexibility of the system enables students to study the production of enriched nitrogen or oxygen streams. Automatic data acquisition permits the study of cycle steps and performance.…

  3. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  4. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  5. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  6. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. E. Shanklin

    2007-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772)

  7. Genomic testing interacts with reproductive surplus in reducing genetic lag and increasing economic net return

    DEFF Research Database (Denmark)

    Hjortø, Line; Ettema, Jehan Frans; Kargo, Morten

    2015-01-01

    Until now, genomic information has mainly been used to improve the accuracy of genomic breeding values for breeding animals at a population level. However, we hypothesize that the use of information from genotyped females also opens up the possibility of reducing genetic lag in a dairy herd......, especially if genomic tests are used in combination with sexed semen or a high management level for reproductive performance, because both factors provide the opportunity for generating a reproductive surplus in the herd. In this study, sexed semen is used in combination with beef semen to produce high......-value crossbred beef calves. Thus, on average there is no surplus of and selection among replacement heifers whether to go into the herd or to be sold. In this situation, the selection opportunities arise when deciding which cows to inseminate with sexed semen, conventional semen, or beef semen. We tested...

  8. Surplus, Scarcity and Soil Fertility in Pre-Industrial Austrian Agriculture—The Sustainability Costs of Inequality

    Directory of Open Access Journals (Sweden)

    Michael Gizicki-Neundlinger

    2017-02-01

    Full Text Available This paper takes a Long-Term Socio-Ecological Research (LTSER perspective to integrate important aspects of social inequality into Socio-Ecological Metabolism (SEM research. SEM has dealt with biophysical features of pre-industrial agricultural systems from a largely apolitical perspective, neglecting social relations and conditions of peasant production and reproduction. One of the politically and economically most important manorial systems in Early Modern Austria (Grundherrschaft Grafenegg serves as a case study to reconstruct the unequal distribution of central resources between ruling landlords and subjected peasants. We show that peasant land use systems generated small surpluses only, whereas landlords enjoyed significant economies of scale. Furthermore, we explore what these conditions of landlord surplus and peasant scarcity implied for their respective agro-ecological sustainability. Finally, we argue that within pre-industrial agrarian systems sustainability costs of inequality were severely limiting margins for agricultural intensification and growth of peasant economies.

  9. Relative willingness to pay and surplus comparison mechanism in experimental auctions

    OpenAIRE

    COMBRIS Pierre; SEABRA PINTO Alexandra; GIRAUD HERAUD Eric

    2015-01-01

    We study the relative willingness-to-pay (WTP) of consumers according to the diversity of supply in a market and we show how the presence of substitutes for a given product leads to question the incentive mechanisms commonly used in experimental auctions. We propose a Surplus Comparison Mechanism (SCM) in order to yield WTP estimates which better take into account the choice set available to consumers. After showing the efficiency of this mechanism we test the SCM in a laboratory experiment, ...

  10. Effect of RCIC Operating Conditions on the Accident Scenario in Fukushima Unit 2

    International Nuclear Information System (INIS)

    Kim, Sung Il; Park, Jong Hwa; Ha, Kwang Soon

    2015-01-01

    This study was conducted by using MELCOR 1.8.6. Fukushima unit 2 accident was analyzed using MELCOR in this study, and best estimate scenario with considering RCIC operating conditions was presented. Researches on the boiling water reactor (BWR) plant with reactor core isolation cooling (RCIC) system have been conducted. Research on the RCIC operation in Fukushima unit 2 was also conducted by Sandia National Laboratory. MELCOR analysis of the Fukushima unit 2 accident was conducted in the report and energy balance in wetwell was described by considering RCIC operation. However, the effect of RCIC operation condition on the accident scenario has not been studied. The operating conditions of RCIC system affect the pressures in wetwell and drywell, and the high pressure can make leakage path of fission product from PCV to reactor building. Thus it can be directly related with the amount of fission product which released to environment. In this study, severe accident on Fukushima unit 2 was analyzed considering the operating condition of RCIC system, and best estimated scenario was presented. In addition, the effect of RCIC turbine efficiency on the accident progression was examined. Energy balance in suppression chamber was also considered with discussion on the effect of torus room flooding level. It was found that the operating condition of RCIC turbine not only affects the variation of drywell pressure but also the amount of released fission products to environment. It was also confirmed that the RCIC turbine efficiency in the accident would be less than normal operating condition

  11. Brunswick Steam Electric Plant, Units 1 and 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 30,399 MWH with the generator on line 334.5 hrs. Unit 2 generated 2,481,014 MWH with the generator on line 4,915.53 hrs. Information is presented concerning operations, shutdowns and power reductions, maintenance, power generation, modifications, changes to operational procedures, radiation exposures, and leak rate testing

  12. Remedial investigation/feasibility study work plan for the 100-FR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-3 operable unit. The 100-K Area consists of the 100-FR-3 groundwater operable unit and two source operable units. The 100-FR-3 operable unit includes all contamination found in the aquifer soils and water beneath the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination. A separate work plan has been initiated for the 100-FR-1 source operable unit (DOE-RL 1992a)

  13. Remedial investigation/feasibility study work plan for the 100-FR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    Four areas of the Hanford Site (the 100, 200,300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-1 operable unit. The 100-FR-1 source operable unit is one of two source operable units in the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination. The groundwater affected or potentially affected by the entire 100-F Area is considered as a separate operable unit, the 100-FR-3 groundwater operable unit. A separate work plan has been initiated for the 100-FR-3 operable unit (DOE/RL 1992a)

  14. Evaluation of Agri-Environmental Measures in the Venice Lagoon Watershed. Nitrogen Budgets and Surplus Indicators

    Directory of Open Access Journals (Sweden)

    Marta Carpani

    2008-09-01

    Full Text Available One of the main concerns of the environmental scientists and policy makers is related to the environmental compatibility of current agricultural systems and, in particular, to the losses of chemical fertilizers and manure in surface and ground-waters, as a consequence of run-off and leaching phenomena. In most cases European recent agrienvironmental schemes envisaged specific measures for the reduction of fertilizer rates and the control of manure applications, in order to limit the releases of nutrients in surface and ground-waters. Substantial financial resources are invested in those measures and therefore the issue raises interest in monitoring and evaluating their effectiveness. Nutrient balance indicators are often used for quantitative assessment of the effectiveness of the measures in limiting the environmental impact of farming activities. N-surplus is one of the most commonly used indicators. The paper refers the results of a research project aimed at assessing the outcomes of agri-environmental measures implemented in the Venice Lagoon Watershed with an approach based upon the gross nitrogen balance, called “Nboxes”. The results of applying the Nboxes procedure to a sample of 550 farms set are presented, evidencing the expectations of greater effectiveness in terms of nitrogen surplus reduction from the measure C.5.1.3a and C.5.1.3b (low input farming and buffer strips. Measures supporting improved irrigation systems, controlled drainage and more rational livestock nutritional programmes and technologies, showed instead only limited potential for tangible contributions to the reduction of nitrogen surplus in cultivated soils.

  15. Evaluation of Agri-Environmental Measures in the Venice Lagoon Watershed. Nitrogen Budgets and Surplus Indicators

    Directory of Open Access Journals (Sweden)

    Patrizia Trevisiol

    2011-02-01

    Full Text Available One of the main concerns of the environmental scientists and policy makers is related to the environmental compatibility of current agricultural systems and, in particular, to the losses of chemical fertilizers and manure in surface and ground-waters, as a consequence of run-off and leaching phenomena. In most cases European recent agrienvironmental schemes envisaged specific measures for the reduction of fertilizer rates and the control of manure applications, in order to limit the releases of nutrients in surface and ground-waters. Substantial financial resources are invested in those measures and therefore the issue raises interest in monitoring and evaluating their effectiveness. Nutrient balance indicators are often used for quantitative assessment of the effectiveness of the measures in limiting the environmental impact of farming activities. N-surplus is one of the most commonly used indicators. The paper refers the results of a research project aimed at assessing the outcomes of agri-environmental measures implemented in the Venice Lagoon Watershed with an approach based upon the gross nitrogen balance, called “Nboxes”. The results of applying the Nboxes procedure to a sample of 550 farms set are presented, evidencing the expectations of greater effectiveness in terms of nitrogen surplus reduction from the measure C.5.1.3a and C.5.1.3b (low input farming and buffer strips. Measures supporting improved irrigation systems, controlled drainage and more rational livestock nutritional programmes and technologies, showed instead only limited potential for tangible contributions to the reduction of nitrogen surplus in cultivated soils.

  16. Final record of decision for remedial actions at Operable Unit 4

    International Nuclear Information System (INIS)

    1994-12-01

    This decision document presents the selected remedial action for Operable Unit 4 of the Fernald Site in Fernald, Ohio. This remedial action was selected in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and to the extent practicable 40 Code of Federal Regulations (CFR) Part 300, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). For Operable Unit 4 at the FEMP, DOE has chosen to complete an integrated CERCLA/NEPA process. This decision was based on the longstanding interest on the part of local stakeholders to prepare an Environmental Impact Statement (EIS) on the restoration activities at the FEMP and on the recognition that the draft document was issued and public comments received. Therefore, this single document is intended to serve as DOE's Record of Decision (ROD) for Operable Unit 4 under both CERCLA and NEPA; however, it is not the intent of the DOE to make a statement on the legal applicability of NEPA to CERCLA actions

  17. Qualitative risk assessment for the 100-HR-3 groundwater operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Vukelich, S.E. [Golder Associates, Inc., Richland, WA (United States)

    1994-09-22

    This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River.

  18. Qualitative risk assessment for the 100-HR-3 groundwater operable unit

    International Nuclear Information System (INIS)

    Vukelich, S.E.

    1994-01-01

    This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River

  19. 14 CFR 375.41 - Agricultural and industrial operations within the United States.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Agricultural and industrial operations... Agricultural and industrial operations within the United States. Foreign civil aircraft shall not be used for such commercial air operations as crop dusting, pest control, pipeline patrol, mapping, surveying...

  20. Limited field investigation report for the 100-HR-2 Operable Unit

    International Nuclear Information System (INIS)

    1995-07-01

    This report summarizes the data collection and analysis activities conducted during the 100-HR-2 Operable Unit investigative phase and the associated qualitative risk assessment. The 100-HR-2 Operable Unit contains solid waste burial grounds, an ash pit, burn pits, electrical facilities, septic systems, and support facilities. All known and suspected areas of contamination were classified as solid waste burial grounds or low-priority waste sites based on the collective knowledge of the operable unit managers (representatives from the US Department of Energy, the US Environmental Protection Agency, and Washington State Department of Ecology during the preparation of the 100-HR-2 Operable Unit Work Plan (DOE-RL 1993f). Solid waste burial grounds were judged to pose sufficient risk(s), through one or more pathways, to require evaluation for an interim remedial measure as per the Hanford Past-Practice Strategy (DOE-RL 1991) and negotiations with the Department of Energy, US Environmental Protection Agency, and Washington State Department of Ecology. An interim remedial measure is intended to achieve remedies that are likely to lead to a final record of decision. Low-priority sites are those judged not to pose significant risk to require the streamlined evaluation. There were six low-priority waste sites and seven solid waste burial grounds identified. The purpose of this report is to: (1) provide a summary of site investigative activities; (2) refine the conceptual exposure model (as needed); (3) identify chemical- and location-specific corrective action requirements; and 4) provide a human health and ecological QRA associated with solid waste burial grounds

  1. Feasibility study report for Operable Unit 4: Volume 1

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP

  2. Westinghouse Hanford Company risk management strategy for retired surplus facilities

    International Nuclear Information System (INIS)

    Taylor, W.E.; Coles, G.A.; Shultz, M.V.; Egge, R.G.

    1993-09-01

    This paper describes an approach that facilitates management of personnel safety and environmental release risk from retired, surplus Westinghouse Hanford Company-managed facilities during the predemolition time frame. These facilities are located in the 100 and 200 Areas of the 1,450-km 2 (570-mi 2 ) Hanford Site in Richland, Washington. The production reactors are located in the 100 Area and the chemical separation facilities are located in the 200 Area. This paper also includes a description of the risk evaluation process, shows applicable results, and includes a description of comparison costs for different risk reduction options

  3. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Biggerstaff, R.L.

    1994-06-30

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy`s (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment.

  4. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    International Nuclear Information System (INIS)

    Biggerstaff, R.L.

    1994-01-01

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy's (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment

  5. Direct conversion of surplus fissile materials, spent nuclear fuel, and other materials to high-level-waste glass

    International Nuclear Information System (INIS)

    Forsberg, C.W.; Elam, K.R.

    1995-01-01

    With the end of the cold war the United States, Russia, and other countries have excess plutonium and other materials from the reductions in inventories of nuclear weapons. The United States Academy of Sciences (NAS) has recommended that these surplus fissile materials (SFMs) be processed so they are no more accessible than plutonium in spent nuclear fuel (SNF). This spent fuel standard, if adopted worldwide, would prevent rapid recovery of SFMs for the manufacture of nuclear weapons. The NAS recommended investigation of three sets of options for disposition of SFMs while meeting the spent fuel standard: (1) incorporate SFMs with highly radioactive materials and dispose of as waste, (2) partly burn the SFMs in reactors with conversion of the SFMs to SNF for disposal, and (3) dispose of the SFMs in deep boreholes. The US Government is investigating these options for SFM disposition. A new method for the disposition of SFMs is described herein: the simultaneous conversion of SFMs, SNF, and other highly radioactive materials into high-level-waste (HLW) glass. The SFMs include plutonium, neptinium, americium, and 233 U. The primary SFM is plutonium. The preferred SNF is degraded SNF, which may require processing before it can be accepted by a geological repository for disposal

  6. Remedial investigation/feasibility study work plan for the 100-BC-5 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-04-01

    Four areas of the Hanford Site (the 100, 200, 300 and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plant and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  7. Training operators of VVER-1000 units in Eastern Europe

    International Nuclear Information System (INIS)

    Normand, X.; Nabet, E.; Hauesberger, P.

    1996-01-01

    The VVER 1000 is the most recent nuclear reactor designed in the former Soviet Union. Its design and operation principles are close to Western four-loop reactors in the 1000- to 1500-MW class; therefore, the Western simulation technology is usually directly applicable to the simulation of these units. Moreover, the current number of state-of-the-art training simulators in operation is very limited. A total of 19 units are in operation, while only 2 modern simulators are available (full-scope type) in Balakovo and Zaporozhe. Access to these simulators is practically limited to the respective plants' trainees, which means that the other units have to be satisfied with hands-on training. Facing this situation and taking into account the predicted lifetime of these plants (15 to 25 yr to go, maybe more), a lot of effort has been made in recent years to provide the plants with modern simulators. The major hurdles to this action were obviously financial and technical (availability of codes, computers, software tools). Today, one full-scope project (Kalinin) is almost complete, and three have been announced (Novovoronezh, Khmelnitsky, Kozloduy). Full-scope simulators are clearly the ultimate target of a concerned power plants. However, all users do realize the advantages of the complementary approach with compact simulators: 1. They can be available quickly for starting the training process. 2. They cover a training field that is not (or partly) addressed by full-scope simulators, i.e., the demonstration of physical phenomena in normal and accidental situations

  8. Fuel qualification issues and strategies for reactor-based surplus plutonium disposition

    International Nuclear Information System (INIS)

    Cowell, B.S.; Copeland, G.L.; Moses, D.L.

    1997-08-01

    The Department of Energy (DOE) has proposed irradiation of mixed-oxide (MOX) fuel in existing commercial reactors as a disposition method for surplus plutonium from the weapons program. The burning of MOX fuel in reactors is supported by an extensive technology base; however, the infrastructure required to implement reactor-based plutonium disposition does not exist domestically. This report identifies and examines the actions required to qualify and license weapons-grade (WG) plutonium-based MOX fuels for use in domestic commercial light-water reactors (LWRs)

  9. An examination of sources of sensitivity of consumer surplus estimates in travel cost models.

    Science.gov (United States)

    Blaine, Thomas W; Lichtkoppler, Frank R; Bader, Timothy J; Hartman, Travis J; Lucente, Joseph E

    2015-03-15

    We examine sensitivity of estimates of recreation demand using the Travel Cost Method (TCM) to four factors. Three of the four have been routinely and widely discussed in the TCM literature: a) Poisson verses negative binomial regression; b) application of Englin correction to account for endogenous stratification; c) truncation of the data set to eliminate outliers. A fourth issue we address has not been widely modeled: the potential effect on recreation demand of the interaction between income and travel cost. We provide a straightforward comparison of all four factors, analyzing the impact of each on regression parameters and consumer surplus estimates. Truncation has a modest effect on estimates obtained from the Poisson models but a radical effect on the estimates obtained by way of the negative binomial. Inclusion of an income-travel cost interaction term generally produces a more conservative but not a statistically significantly different estimate of consumer surplus in both Poisson and negative binomial models. It also generates broader confidence intervals. Application of truncation, the Englin correction and the income-travel cost interaction produced the most conservative estimates of consumer surplus and eliminated the statistical difference between the Poisson and the negative binomial. Use of the income-travel cost interaction term reveals that for visitors who face relatively low travel costs, the relationship between income and travel demand is negative, while it is positive for those who face high travel costs. This provides an explanation of the ambiguities on the findings regarding the role of income widely observed in the TCM literature. Our results suggest that policies that reduce access to publicly owned resources inordinately impact local low income recreationists and are contrary to environmental justice. Copyright © 2014 Elsevier Ltd. All rights reserved.

  10. Suitability of oil bioremediation in an Artic soil using surplus heating from an incineration facility

    DEFF Research Database (Denmark)

    Couto, Nazare; Fritt-Rasmussen, Janne; Jensen, Pernille Erland

    2014-01-01

    A 168-day period field study, carried out in Sisimiut, Greenland, assessed the potential to enhance soil remediation with the surplus heating from an incineration facility. This approach searches a feasible ex situ remediation process that could be extended throughout the year with low costs. Ind...

  11. Operative training in otolaryngology in the United Kingdom: a specialist registrar survey

    NARCIS (Netherlands)

    Georgalas, Christos; Hadjihannas, Edward; Ghufoor, Khalid; Pracy, Paul; Papesch, Michael

    2005-01-01

    OBJECTIVE: To assess the current status of operative training for otolaryngology specialist registrars in the United Kingdom. DESIGN: Web-based questionnaire survey. PARTICIPANTS: All otolaryngology specialist registrars in the United Kingdom. MAIN OUTCOME MEASURES: The overall satisfaction with

  12. Level 1 shutdown and low power operation of Mochovce NPP, Unit 1, Slovakia

    International Nuclear Information System (INIS)

    Halada, P.; Cillik, I.; Stojka, T.; Kuzma, M.; Prochaska, J.; Vrtik, L.

    2004-01-01

    The paper presents general approach, used methods and form of documentation of the results that have been applied within the shutdown and low power PSA (SPSA) study for Mochovce NPP, Unit 1, Slovakia. The SPSA project was realized by VUJE Trnava Inc., Slovakia in 2001-2002 years. The Level 1 SPSA study for Mochovce NPP Unit 1 covers internal events as well as internal (fires, floods and heavy load drop) and external (aircraft crash, extreme meteorological conditions, seismic event and influence of surrounding industry) hazards. Mochovce NPP consists of two operating units equipped with VVER 440/V213 reactors safety upgraded before construction finishing and operation start. 87 safety measures based on VVER 440 operational experience and international mission insights were implemented to enhance its operational and nuclear safety. The SPSA relates to full power PSA (FPSA) as a continuation of the effort to create a harmonized level 1 PSA model for all operational modes of the plant with the goal to use it for further purposes as follows: Real Time Risk Monitor, Maintenance Optimization, Technical Specifications Optimization, Living PSA. (author)

  13. Macroeconomic impacts of bioenergy production on surplus agricultural land. A case study of Argentina

    International Nuclear Information System (INIS)

    Wicke, Birka; Smeets, Edward; Faaij, Andre; Tabeau, Andrzej; Hilbert, Jorge

    2009-01-01

    This paper assesses the macroeconomic impacts in terms of GDP, trade balance and employment of large-scale bioenergy production on surplus agricultural land. An input-output model is developed with which the direct, indirect and induced macroeconomic impacts of bioenergy production and agricultural intensification, which is needed to make agricultural land become available for bioenergy production, are assessed following a scenario approach. The methodology is applied to a case study of Argentina. The results of this study reveal that large-scale pellet production in 2015 would directly increase GDP by 4%, imports by 10% and employment by 6% over the reference situation in 2001. When accounting for indirect and induced impacts, GDP increases by 18%, imports by 20% and employment by 26% compared to 2001. Agricultural intensification reduces but does not negate these positive impacts of bioenergy production. Accounting for agricultural intensification, the increase in GDP as a result of bioenergy production on surplus agricultural land would amount to 16%, 20% in imports and 16% in employment compared to 2001. (author)

  14. Macroeconomic impacts of bioenergy production on surplus agricultural land. A case study of Argentina

    Energy Technology Data Exchange (ETDEWEB)

    Wicke, Birka; Smeets, Edward; Faaij, Andre [Copernicus Institute for Sustainable Development and Innovation - Utrecht University, Heidelberglaan 2, 3584 CS Utrecht (Netherlands); Tabeau, Andrzej [Landbouw Economisch Instituut - Wageningen University and Research Centre, Burgermeester Partijnlaan 19, 2585 BE Den Haag (Netherlands); Hilbert, Jorge [Instituto Ingenieria Rural - Instituto Nacional de la Tecnologia Agropecuario, C.C. 25, 1712 Castelar (Buenos Aires) (Argentina)

    2009-12-15

    This paper assesses the macroeconomic impacts in terms of GDP, trade balance and employment of large-scale bioenergy production on surplus agricultural land. An input-output model is developed with which the direct, indirect and induced macroeconomic impacts of bioenergy production and agricultural intensification, which is needed to make agricultural land become available for bioenergy production, are assessed following a scenario approach. The methodology is applied to a case study of Argentina. The results of this study reveal that large-scale pellet production in 2015 would directly increase GDP by 4%, imports by 10% and employment by 6% over the reference situation in 2001. When accounting for indirect and induced impacts, GDP increases by 18%, imports by 20% and employment by 26% compared to 2001. Agricultural intensification reduces but does not negate these positive impacts of bioenergy production. Accounting for agricultural intensification, the increase in GDP as a result of bioenergy production on surplus agricultural land would amount to 16%, 20% in imports and 16% in employment compared to 2001. (author)

  15. Remedial investigation/feasibility study work plan for the 100-BC-5 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The Tri-Party Agreement requires that the cleanup programs at the Hanford Site integrate the requirements of CERCLA, RCRA, and Washington State's dangerous waste (the state's RCRA-equivalent) program. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  16. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Hanford Missions Programs; Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Process Technology Programs; Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development; Edwards, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development

    2016-07-14

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the process demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the

  17. 40 CFR 60.105a - Monitoring of emissions and operations for fluid catalytic cracking units (FCCU) and fluid coking...

    Science.gov (United States)

    2010-07-01

    ..., Catalytic Reforming Units, and Sulfur Recovery Units. (iii) The owner or operator shall install, operate... for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). 60.105a Section 60.105a... and operations for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). (a) FCCU and...

  18. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency's (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter

  19. Adaptation of Professional Skills in the Unit Operations Laboratory

    Science.gov (United States)

    Rende, Deniz; Rende, Sevinc; Baysal, Nihat

    2012-01-01

    We introduce the design of three consecutive unit operations laboratory (UOL) courses that retain the academic rigor of the course while incorporating skills essential for professional careers, such as ability to propose ideas, develop practical solutions, participate in teamwork, meet deadlines, establish communication between technical support…

  20. Operational experinece with large scale biogas production at the promest manure processing plant in Helmond, the Netherlands

    International Nuclear Information System (INIS)

    Schomaker, A.H.H.M.

    1992-01-01

    In The Netherlands a surplus of 15 million tons of liquid pig manure is produced yearly on intensive pig breeding farms. The dutch government has set a three-way policy to reduce this excess of manure: 1. conversion of animal fodder into a product with less and better ingestible nutrients; 2. distribution of the surplus to regions with a shortage of animal manure; 3. processing of the remainder of the surplus in large scale processing plants. The first large scale plant for the processing of liquid pig manure was put in operation in 1988 as a demonstration plant at Promest in Helmond. The design capacity of this plant is 100,000 tons of pig manure per year. The plant was initiated by the Manure Steering Committee of the province Noord-Brabant in order to prove at short notice whether large scale manure processing might contribute to the solution of the problem of the manure surplus in The Netherlands. This steering committee is a corporation of the national and provincial government and the agricultural industrial life. (au)

  1. Initial closed operation of the CELSS Test Facility Engineering Development Unit

    Science.gov (United States)

    Kliss, M.; Blackwell, C.; Zografos, A.; Drews, M.; MacElroy, R.; McKenna, R.; Heyenga, A. G.

    2003-01-01

    As part of the NASA Advanced Life Support Flight Program, a Controlled Ecological Life Support System (CELSS) Test Facility Engineering Development Unit has been constructed and is undergoing initial operational testing at NASA Ames Research Center. The Engineering Development Unit (EDU) is a tightly closed, stringently controlled, ground-based testbed which provides a broad range of environmental conditions under which a variety of CELSS higher plant crops can be grown. Although the EDU was developed primarily to provide near-term engineering data and a realistic determination of the subsystem and system requirements necessary for the fabrication of a comparable flight unit, the EDU has also provided a means to evaluate plant crop productivity and physiology under controlled conditions. This paper describes the initial closed operational testing of the EDU, with emphasis on the hardware performance capabilities. Measured performance data during a 28-day closed operation period are compared with the specified functional requirements, and an example of inferring crop growth parameters from the test data is presented. Plans for future science and technology testing are also discussed. Published by Elsevier Science Ltd on behalf of COSPAR.

  2. 100-HR-1 Operable Unit focused feasibility study report. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Feasibility Study (FS) includes development and screening of alternatives (phases 1 and 2) and the detailed analysis of alternatives (phase 3). This focused feasibility study (FFS) constitutes the phase 3 portion of the FS process. The FFS process is conducted in two stages, a Process Document (DOE-RL 1994a) and an operable unit-specific FFS document, such as this one. The FFS process is performed by implementing a ''plug-in'' style approach as defined in great detail in the Process Document. The objective of this operable unit-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for sites associated with the 100-HR-1 Operable Unit. The IRM candidate waste sites are determined in the limited field investigation. Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  3. Operational behaviour of WWER nuclear power units after Chernobyl accident

    International Nuclear Information System (INIS)

    Milivojevic, S.; Spasojevic, D.

    2000-01-01

    The indicators of effectiveness of WWER operation, in 1987-1998 were analyzed. For three groups of nuclear units (WWER, NPP Kozloduy, NPP Paks), the trends of Indicators flow were established. The comparative analysis of forced outage rate, and load factor of WWERs and nuclear units all in the world was carried out; it gives the general picture of accident influence on the states and the relations of these indicators in considered period (author)

  4. H. B. Robinson Plant, Unit 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit achieved a good performance record through the year, experiencing only short duration shutdowns or power reductions. Information is presented concerning operations, maintenance, shutdowns, and occupational radiation exposures. In November there was a scheduled refueling lasting 40 days. After a start-up physics test program, the unit achieved 100 percent power on December 22, 1976

  5. The food waste hierarchy as a framework for the management of food surplus and food waste

    NARCIS (Netherlands)

    Papargyropoulou, Effie; Lozano, Rodrigo|info:eu-repo/dai/nl/36412380X; K. Steinberger, Julia; Wright, Nigel; Ujang, Zaini Bin

    2014-01-01

    The unprecedented scale of food waste in global food supply chains is attracting increasing attention due to its environmental, social and economic impacts. Drawing on interviews with food waste specialists, this study construes the boundaries between food surplus and food waste, avoidable and

  6. The local field potential reflects surplus spike synchrony

    DEFF Research Database (Denmark)

    Denker, Michael; Roux, Sébastien; Lindén, Henrik

    2011-01-01

    While oscillations of the local field potential (LFP) are commonly attributed to the synchronization of neuronal firing rate on the same time scale, their relationship to coincident spiking in the millisecond range is unknown. Here, we present experimental evidence to reconcile the notions...... of synchrony at the level of spiking and at the mesoscopic scale. We demonstrate that only in time intervals of significant spike synchrony that cannot be explained on the basis of firing rates, coincident spikes are better phase locked to the LFP than predicted by the locking of the individual spikes....... This effect is enhanced in periods of large LFP amplitudes. A quantitative model explains the LFP dynamics by the orchestrated spiking activity in neuronal groups that contribute the observed surplus synchrony. From the correlation analysis, we infer that neurons participate in different constellations...

  7. Estimating the 'consumer surplus' for branded versus standardised tobacco packaging.

    Science.gov (United States)

    Gendall, Philip; Eckert, Christine; Hoek, Janet; Farley, Tessa; Louviere, Jordan; Wilson, Nick; Edwards, Richard

    2016-11-01

    Tobacco companies question whether standardised (or 'plain') packaging will change smokers' behaviour. We addressed this question by estimating how standardised packaging compared to a proven tobacco control intervention, price increases through excise taxes, thus providing a quantitative measure of standardised packaging's likely effect. We conducted an online study of 311 New Zealand smokers aged 18 years and above that comprised a willingness-to-pay task comparing a branded and a standardised pack at four different price levels, and a choice experiment. The latter used an alternative-specific design, where the alternatives were a branded pack or a standardised pack, with warning theme and price varied for each pack. Respondents had higher purchase likelihoods for the branded pack (with a 30% warning) than the standardised pack (with a 75% warning) at each price level tested, and, on average, were willing to pay approximately 5% more for a branded pack. The choice experiment produced a very similar estimate of 'consumer surplus' for a branded pack. However, the size of the 'consumer surplus' varied between warning themes and by respondents' demographic characteristics. These two experiments suggest standardised packaging and larger warning labels could have a similar overall effect on adult New Zealand smokers as a 5% tobacco price increase. The findings provide further evidence for the efficacy of standardised packaging, which focuses primarily on reducing youth initiation, and suggest this measure will also bring notable benefits to adult smokers. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  8. 40 CFR 62.15145 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 62.15145 Section 62.15145 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operating Requirements § 62.15145 What are the operating practice requirements for my municipal waste combustion unit? (a) You...

  9. Feasibility study report for Operable Unit 4: Volume 2

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP. This volume contains appendices A--E

  10. [Was the current surplus of neurosurgeons predictable in 2009? Analysis of the situation based on the Report of supply and demand of medical specialists in Spain (2008-2025)].

    Science.gov (United States)

    Martín-Láez, Rubén; Ibáñez, Javier; Lagares, Alfonso; Fernández-Alén, José; Díez-Lobato, Ramiro

    2012-11-01

    In 2009 the Spanish Ministry of Health (SMH) published the report of supply and demand of medical specialists in Spain (2008-2025), in which our specialty was considered as presenting a moderate deficit of consultants. However, Spanish neurosurgery is currently in a situation of having a surplus of neurosurgeons. To determine whether it was possible to predict the current excess of neurosurgeons in 2009 and to forecast the most likely perspective of supply and demand in 2017. Raw data extracted from the SMH report, information on the ages of the Spanish neurosurgeons obtained from the study performed by our Board of Directors in 2001, and annual mortality rates for different age ranges provided by the National Institute of Statistics, were used to predict the evolution of supply and demand of neurosurgeons for the periods 2008-2012 and 2013-2017. The current situation of an excess of specialists was predictable in 2009, and if appropriate measures are not taken, a surplus of more than 100 neurosurgeons is likely in 2017, with an unemployment rate above 26% in the worst scenario. In order to match the actual and future demand of specialists, it is necessary and urgent to reduce the number of neurosurgical in-training positions. To achieve this goal, it is essential to obtain periodical and up-to-date structural information of the different Neurosurgery Departments and Units, and to revisit the accreditation terms of the more than fifty current teaching units. Copyright © 2012 Sociedad Española de Neurocirugía. Published by Elsevier España. All rights reserved.

  11. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    International Nuclear Information System (INIS)

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume

  12. An Appraisal Of The Operation And Management Of Unit Trust ...

    African Journals Online (AJOL)

    An Appraisal Of The Operation And Management Of Unit Trust Schemes In Nigeria. ... Open Access DOWNLOAD FULL TEXT ... instead of being invested in shares or in money market instruments as a result of widespread financial illiteracy.

  13. An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management

    Science.gov (United States)

    2010-12-01

    An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management ______________________________________ By...Report 4. TITLE AND SUBTITLE: An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management 6...Level Training; United States Marine Corps; Operations Management ; Supply Chain Management; Process Analysis 16. PRICE CODE 17. SECURITY

  14. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are 99 Tc and 60 Co for underwater affected by past discharges to the 216-BY Cribs, and 90 Sr, 239/240 Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes

  15. Control technique for enhancing the stable operation of distributed generation units within a microgrid

    International Nuclear Information System (INIS)

    Mehrasa, Majid; Pouresmaeil, Edris; Mehrjerdi, Hasan; Jørgensen, Bo Nørregaard; Catalão, João P.S.

    2015-01-01

    Highlights: • A control technique for enhancing the stable operation of distributed generation units is proposed. • Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors. • The compensation of instantaneous variations in the reference current components is considered. • Simulation results confirm the performance of the control scheme within the microgrid. - Abstract: This paper describes a control technique for enhancing the stable operation of distributed generation (DG) units based on renewable energy sources, during islanding and grid-connected modes. The Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors of DG units during integration and power sharing with loads and/or power grid, which is an appropriate tool to analyze and define a stable operating condition for DG units in microgrid technology. The compensation of instantaneous variations in the reference current components of DG units in ac-side, and dc-link voltage variations in dc-side of interfaced converters, are considered properly in the control loop of DG units, which is the main contribution and novelty of this control technique over other control strategies. By using the proposed control technique, DG units can provide the continuous injection of active power from DG sources to the local loads and/or utility grid. Moreover, by setting appropriate reference current components in the control loop of DG units, reactive power and harmonic current components of loads can be supplied during the islanding and grid-connected modes with a fast dynamic response. Simulation results confirm the performance of the control scheme within the microgrid during dynamic and steady-state operating conditions

  16. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  17. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  18. RCRA facility investigation/corrective measures study work plan for the 100-HR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US. Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-1 source operable unit. Source operable units include facilities and unplanned release sites that are potential sources of contamination. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Separate work plans have been initiated for the 100-HR-3 groundwater operable unit (DOE-RL 1992a) and the 100-DR-1 (DOE-RL 1992b) source operable units

  19. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    Science.gov (United States)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  20. On Point: The United States Army in Operation Iraqi Freedom

    Science.gov (United States)

    2004-01-01

    to retain operational context. Moreover, times noted in the text have been adjusted from Greenwich Mean Time (“ Zulu ”) to local Kuwait time (+ 3...TF 1-64 AR unit history is composed of short narratives for each subordinate unit. Most cite times in zulu . 34. Ibid. 35. Ibid. Numbers of enemy...places in the world. Inside the city cemetery is the Tomb of Ali, son-in-law and cousin to Mohammed and founder of the Shiite sect. Coalition leaders

  1. Experimental determinations of the turbine condenser operation at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Romascu, Gabriel; Dragusin, Dumitru; Rogociu, Ioan; Macodean, Luminita; Marciulescu, George

    1999-01-01

    The condenser system represents one of the most important BOP (balance of plant) systems of the CANDU 700 MW Unit at Cernavoda NPP. The paper presents theoretical calculation elements, mathematical model for simulation of condenser operation and the results obtained by model implementation as compared to operation data. The model could be adapted to other turbine and operation regime types. (authors)

  2. Survey method for radiological surveys of 300 FF-1 Operable Unit soil and materials

    International Nuclear Information System (INIS)

    Greif, A.A.

    1997-06-01

    This technical basis document is to be used to survey soils at the 300-FF-1 Operable Unit during remediation of the site. Its purpose is to provide a basis for the survey methods to be employed by the Radiological Control Technician to determine if excavated areas require continued remediation in accordance with the Record of Decision for the operable unit

  3. Progress and problems in the Formerly Utilized Sites Remedial Action Program and Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Fiore, J.J.; Turi, G.P.

    1988-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to identify, evaluate, and as appropriate, conduct remedial actions at sites used in the early years of nuclear energy development by the Manhattan Engineer District and the Atomic Energy Commission (AEC). This program currently has 29 sites and is evaluating 350 other sites for possible inclusion in the program. Another remedial action program in the Department of Energy's (DOE) Division of Facility and Site Decommissioning Projects is the Surplus Facilities Management Program (SFMP). The SFMP involves the safe management, decontamination and disposal of surplus DOE contaminated facilities which were not related to defense activities. There are currently 33 projects at 15 different sites in the program. These two programs have made steady progress over the last 10 or so years in cleaning up sites so that they can be reused or released for unrestricted use. Work has been completed at 8 of the FUSRAP sites and three of the SFMP sites

  4. The role of heat pipes in intensified unit operations

    International Nuclear Information System (INIS)

    Reay, David; Harvey, Adam

    2013-01-01

    Heat pipes are heat transfer devices that rely, most commonly, on the evaporation and condensation of a working fluid contained within them, with passive pumping of the condensate back to the evaporator. They are sometimes referred to as ‘thermal superconductors’ because of their exceptionally high effective thermal conductivity (substantially higher than any metal). This, together with several other characteristics make them attractive to a range of intensified unit operations, particularly reactors. The majority of modern computers deploy heat pipes for cooling of the CPU. The application areas of heat pipes come within a number of broad groups, each of which describes a property of the heat pipe. The ones particularly relevant to chemical reactors are: i. Separation of heat source and sink. ii. Temperature flattening, or isothermalisation. iii. Temperature control. Chemical reactors, as a heat pipe application area, highlight the benefits of the heat pipe based on isothermalisation/temperature flattening device and on being a highly effective heat transfer unit. Temperature control, done passively, is also of relevance. Heat pipe technology offers a number of potential benefits to reactor performance and operation. The aim of increased yield of high purity, high added value chemicals means less waste and higher profitability. Other intensified unit operations, such as those employing sorption processes, can also profit from heat pipe technology. This paper describes several variants of heat pipe and the opportunities for their use in intensified plant, and will give some current examples. -- Highlights: ► Heat pipes – thermal superconductors – can lead to improved chemical reactor performance. ► Isothermalisation within a reactor vessel is an ideal application. ► The variable conductance heat pipe can control reaction temperatures within close limits. ► Heat pipes can be beneficial in intensified reactors

  5. 75 FR 43158 - Amended Record of Decision for the Decommissioning of Eight Surplus Production Reactors at the...

    Science.gov (United States)

    2010-07-23

    ... transition regarding its defense production mission at the time of the Surplus Production Reactor EIS, and.../cultural resources, ecological resources, and cumulative impacts. Preliminary calculations (based on near..., historical/cultural resource, or ecological resources impacts were identified in the Supplement Analysis...

  6. Remedial investigation/feasibility study work plan for the 100-KR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-1 operable unit. The 100-KR-1 source operable unit is one of three source operable units in the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination

  7. PREMATH: a Precious-Material Holdup Estimator for unit operations and chemical processes

    International Nuclear Information System (INIS)

    Krichinsky, A.M.; Bruns, D.D.

    1982-01-01

    A computer program, PREMATH (Precious Material Holdup Estimator), has been developed to permit inventory estimation in vessels involved in unit operations and chemical processes. This program has been implemented in an operating nuclear fuel processing plant. PREMATH's purpose is to provide steady-state composition estimates for material residing in process vessels until representative samples can be obtained and chemical analyses can be performed. Since these compositions are used for inventory estimation, the results are determined for and cataloged in container-oriented files. The estimated compositions represent material collected in applicable vessels - including consideration for material previously acknowledged in these vessels. The program utilizes process measurements and simple material balance models to estimate material holdups and distribution within unit operations. During simulated run testing, PREMATH-estimated inventories typically produced material balances within 7% of the associated measured material balances for uranium and within 16% of the associated, measured material balances for thorium (a less valuable material than uranium) during steady-state process operation

  8. NUMATH: a nuclear-material-holdup estimator for unit operations and chemical processes

    International Nuclear Information System (INIS)

    Krichinsky, A.M.

    1981-01-01

    A computer program, NUMATH (Nuclear Material Holdup Estimator), has been developed to permit inventory estimation in vessels involved in unit operations and chemical processes. This program has been implemented in an operating nuclear fuel processing plant. NUMATH's purpose is to provide steady-state composition estimates for material residing in process vessels until representative samples can be obtained and chemical analyses can be performed. Since these compositions are used for inventory estimation, the results are determined for and cataloged in container-oriented files. The estimated compositions represent material collected in applicable vessels-including consideration for material previously acknowledged in these vessels. The program utilizes process measurements and simple material balance models to estimate material holdups and distribution within unit operations. During simulated run testing, NUMATH-estimated inventories typically produced material balances within 7% of the associated measured material balances for uranium and within 16% of the associated, measured material balance for thorium during steady-state process operation

  9. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  10. APPLICATION OF THE ANALYTIC HIERARCHY PROCESS TO COMPARE ALTERNATIVES FOR THE LONG-TERM MANAGEMENT OF SURPLUS MERCURY

    Science.gov (United States)

    This paper describes a systematic method for comparing options for the long-term management of surplus elemental mercury in the U.S., using the Analytic Hierarchy Process (AHP) as embodied in commercially available Expert Choice software. A limited scope multi-criteria decision-a...

  11. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  12. Point Beach Nuclear Plant, Units 1 and 2. Semiannual operating report No. 10, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 operated at an average capacity factor of 65.2 percent with a net efficiency of 31.41 percent. Unit 2 operted at an average capacity factor of 88.6 lpercent with a net efficiency of 32.28 percent. Unit 1 was essentially base loaded while Unit 2 operated on load follow. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental monitoring. (FS)

  13. Smart house-based optimal operation of thermal unit commitment for a smart grid considering transmission constraints

    Science.gov (United States)

    Howlader, Harun Or Rashid; Matayoshi, Hidehito; Noorzad, Ahmad Samim; Muarapaz, Cirio Celestino; Senjyu, Tomonobu

    2018-05-01

    This paper presents a smart house-based power system for thermal unit commitment programme. The proposed power system consists of smart houses, renewable energy plants and conventional thermal units. The transmission constraints are considered for the proposed system. The generated power of the large capacity renewable energy plant leads to the violated transmission constraints in the thermal unit commitment programme, therefore, the transmission constraint should be considered. This paper focuses on the optimal operation of the thermal units incorporated with controllable loads such as Electrical Vehicle and Heat Pump water heater of the smart houses. The proposed method is compared with the power flow in thermal units operation without controllable loads and the optimal operation without the transmission constraints. Simulation results show the validation of the proposed method.

  14. Heat recovery unit operation of HVAC system in IMEF

    International Nuclear Information System (INIS)

    Paek, S. R.; Oh, Y. W.; Song, E. S.; Park, D. K.; Joo, Y. S.; Hong, K. P.

    2003-01-01

    HVAC system including a supply and exhaust air system in IMEF(Irradiated Materials Examination Facility) is an essential facility for preventing a leakage of radioactive materials and for a preservation of a working environment. It costs a lot to operate the HVAC system in IMEF because our ventilation type is once-through system, and an air flow is maintained from low level contamination area to high level and maintained high turns of ventilation air under certain conditions. As HRU(Heat Recovery Unit) at HVAC system based on PIEF(Post Irradiation Examination Facility) operation experiences is designed and adopted, it prevents from a heating coil freezing destruction in winter and makes much energy saving etc.. Heat pipe type HRU is adopted in IMEF, and a construction and operation result of HRU is examined

  15. Denver Radium Site -- Operable Unit I closeout report for the US Environmental Protection Agency

    International Nuclear Information System (INIS)

    1992-08-01

    The Denver Radium Site consists of properties in the Denver, Colorado, area having radioactive contamination left from radium processing in the early 1900s. The properties are divided into 11 gaps or operable units to facilitate remedial action of the Site. Operable Unit I is an 8-acre block bounded by Quivas Street to the east, Shoshone Street to the west, West 12th Avenue to the south, and West 13th Avenue to the north. The primary focus of interest concerning investigations of radiological contamination was a radium, vanadium, and uranium processing facility at 1201 Quivas Street owned by the Pittsburgh Radium Company (PRC) from 1925 until 1926. The Radium Ores Company, which was associated with PRC, operated the facility until 1927. A Remedial investigation (RI) of Operable Unit I was prepared by Jacobs Engineering Group and CH 2 M Hill on behalf of EPA in April 1986. The draft Feasibility Study (FS), prepared by Jacobs Engineering Group and CH 2 M Hill, was issued in July 1987 (the final FS is the Community Relations Responsiveness Summary with an errata to the draft, issued September 1987). The RI focused on radium uranium processing residues discarded in the early 1900s. These residues contained uranium, radium, and thorium. EPA s Community Relations Plan involved the community in the decision-making process relating to the remedy to be implemented at Operable Unit X, and promoted communications among interested parties throughout the course of the project. The remedial action alternative preferred by EPA for Operable Unit I was Off-Site Permanent Disposal. Because a permanent disposal facility was not available at the time the Record of Decision was issued in September 1987, EPA selected the On-Site Temporary Containment (capping) with the Off-Site Permanent Disposal alternative

  16. 40 CFR 60.2989 - Does this subpart directly affect incineration unit owners and operators in my State?

    Science.gov (United States)

    2010-07-01

    ... incineration unit owners and operators in my State? 60.2989 Section 60.2989 Protection of Environment... SOURCES Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units That Commenced... incineration unit owners and operators in my State? (a) No, this subpart does not directly affect incineration...

  17. 78 FR 14361 - U.S. Steel Tubular Products, Inc., Mckeesport Tubular Operations Division, Subsidiary of United...

    Science.gov (United States)

    2013-03-05

    ... Products, Inc., Mckeesport Tubular Operations Division, Subsidiary of United States Steel Corporation, Mckeesport, PA; Notice of Initiation of Investigation To Terminate Certification of Eligibility Pursuant to... Tubular Products, McKeesport Tubular Operations Division, Subsidiary of United States Steel Corporation...

  18. Effects of whaling on the structure of the Southern Ocean food web: insights on the "krill surplus" from ecosystem modelling.

    Directory of Open Access Journals (Sweden)

    Szymon Surma

    Full Text Available The aim of this study was to examine the ecological plausibility of the "krill surplus" hypothesis and the effects of whaling on the Southern Ocean food web using mass-balance ecosystem modelling. The depletion trajectory and unexploited biomass of each rorqual population in the Antarctic was reconstructed using yearly catch records and a set of species-specific surplus production models. The resulting estimates of the unexploited biomass of Antarctic rorquals were used to construct an Ecopath model of the Southern Ocean food web existing in 1900. The rorqual depletion trajectory was then used in an Ecosim scenario to drive rorqual biomasses and examine the "krill surplus" phenomenon and whaling effects on the food web in the years 1900-2008. An additional suite of Ecosim scenarios reflecting several hypothetical trends in Southern Ocean primary productivity were employed to examine the effect of bottom-up forcing on the documented krill biomass trend. The output of the Ecosim scenarios indicated that while the "krill surplus" hypothesis is a plausible explanation of the biomass trends observed in some penguin and pinniped species in the mid-20th century, the excess krill biomass was most likely eliminated by a rapid decline in primary productivity in the years 1975-1995. Our findings suggest that changes in physical conditions in the Southern Ocean during this time period could have eliminated the ecological effects of rorqual depletion, although the mechanism responsible is currently unknown. Furthermore, a decline in iron bioavailability due to rorqual depletion may have contributed to the rapid decline in overall Southern Ocean productivity during the last quarter of the 20th century. The results of this study underscore the need for further research on historical changes in the roles of top-down and bottom-up forcing in structuring the Southern Ocean food web.

  19. Surplus weapons-grade plutonium: a resource for exploring and terraforming Mars

    International Nuclear Information System (INIS)

    Muscatello, A.C.; Houts, M.G.

    1996-01-01

    With the end of the Cold War, greater than 100 metric tons (MT) of weapons-grade plutonium (WGPu) have become surplus to defense needs in the United States and the Former Soviet Union. This paper is a proposal for an option for WGPu disposition, i.e., use of the plutonium as a fuel for nuclear reactors for Mars exploration and eventual terraforming. WGPu was used in nuclear weapons because it has a much smaller critical mass than highly enriched uranium, allowing lighter weapons with consequent longer ranges. Similarly, WGPu reactors would also require smaller amounts of fuel to attain a critical mass, making the reactor much lighter overall and resulting in large savings in launch costs. The greater than 100 MT of WGPu would generate about 1000 billion kilowatt hours of heat energy, much of which could be converted into electricity. The waste heat would also be useful to a Martian outpost or colony. A potential way of getting the WGPu reactors into space is a large gas gun like that being developed at the Lawrence Livermore National Laboratory to orbit materials by achieving high velocity at the surface, greatly reducing launch costs and enhancing reliability. Reactor components would be launched on conventional rockets or space shuttles, the reactor fuel rods would be injected into orbit using the gas gun, and the reactor would be assembled in space. Implementation of this proposal would allow disposition of a serious, expensive problem on earth by removing the WGPu from the planet and simultaneously provide a very large energy resource for Mars exploration and terraforming

  20. Surplus weapons-grade plutonium: a resource for exploring and terraforming Mars

    Energy Technology Data Exchange (ETDEWEB)

    Muscatello, A.C.; Houts, M.G.

    1996-12-31

    With the end of the Cold War, greater than 100 metric tons (MT) of weapons-grade plutonium (WGPu) have become surplus to defense needs in the United States and the Former Soviet Union. This paper is a proposal for an option for WGPu disposition, i.e., use of the plutonium as a fuel for nuclear reactors for Mars exploration and eventual terraforming. WGPu was used in nuclear weapons because it has a much smaller critical mass than highly enriched uranium, allowing lighter weapons with consequent longer ranges. Similarly, WGPu reactors would also require smaller amounts of fuel to attain a critical mass, making the reactor much lighter overall and resulting in large savings in launch costs. The greater than 100 MT of WGPu would generate about 1000 billion kilowatt hours of heat energy, much of which could be converted into electricity. The waste heat would also be useful to a Martian outpost or colony. A potential way of getting the WGPu reactors into space is a large gas gun like that being developed at the Lawrence Livermore National Laboratory to orbit materials by achieving high velocity at the surface, greatly reducing launch costs and enhancing reliability. Reactor components would be launched on conventional rockets or space shuttles, the reactor fuel rods would be injected into orbit using the gas gun, and the reactor would be assembled in space. Implementation of this proposal would allow disposition of a serious, expensive problem on earth by removing the WGPu from the planet and simultaneously provide a very large energy resource for Mars exploration and terraforming.

  1. Operation experience of the advanced fuel assemblies at Unit 1 of Volgodonsk NPP within four fuel cycles

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Kobelev, S.; Kushmanov, S.

    2006-01-01

    The first commissioning of Volgodonsk NPP Unit 1 with standard reactor WWER-1000 (project V-320) was in 2001. The reactor core, starting from the first fuel charge, was arranged completely with Advanced Fuel Assemblies (AFAs). In this way, it is possible to obtain the experience in startup and operation of the core, completely arranged with AFAs, and also to get a possibility of performing the comprehensive check for justification of newly commissioned units and justification of design solutions accepted in the design of reactor core for Taiwan NPP, Bushehr NPP and Kudankulam NPP. The first fuel charge of the Volgodonsk NPP Unit 1 is a reference and unified for Tiawan NPP (V-428), Bushehr NPP (V-446), Kudankulam NPP(V-412) with small differences caused by design features of RP V-320. The first core charge of Unit 1 of Volgodonsk NPP was arranged of 163 AFAs, comprising 61 CPS ARs and 42 BAR bundles. The subsequent fuel charges were arranged of AFAs with gadolinium oxide integrated into fuel instead of BAR. By 2005 the results of operation of the core at Unit 1 of Volgodonsk NPP during four fuel cycles showed that AFA is sufficiently reliable and serviceable. The activity of the primary coolant of the Volgodonsk NPP is at stable low level. During the whole time of the core operation of the Volgodonsk NPP Unit 1 no leaky AFAs were revealed. The modifications of the internals, made during pre-operational work, are reasonable and effective to provide for fuel mechanical stability in the course of operation. The modifications, made in AFA structure during operation of the Volgodonsk NPP Unit 1, are aimed at improving the service and operational reliability of its components. Correctness of the solutions taken is confirmed by AFAs operation experience both at the Volgodonsk NPP, and at other operating Russian NPPs

  2. Producer Surplus Distributions in GM Crops: The Ignored Impacts of Roundup Ready Wheat

    OpenAIRE

    Wilson, William W.; Huso, Scott R.

    2006-01-01

    Release of a genetically modified (GM) crop variety would lower prices of competing pesticides used on conventional varieties. This causes an increase in surplus for those farmers who adopt the GM variety, as well as for those who plant the conventional variety. A Cournot model was developed to determine the equilibrium quantities of conventional pesticides. A market with conventional wheat was compared to a market with both conventional and GM wheat varieties to identify price decreases of t...

  3. Potential for greenhouse gas emission reductions using surplus electricity in hydrogen, methane and methanol production via electrolysis

    International Nuclear Information System (INIS)

    Uusitalo, Ville; Väisänen, Sanni; Inkeri, Eero; Soukka, Risto

    2017-01-01

    Highlights: • Greenhouse gas emission reductions using power-to-x processes are studied using life cycle assessment. • Surplus electricity use led to greenhouse gas emission reductions in all studied cases. • Highest reductions can be achieved by using hydrogen to replace fossil based hydrogen. • High reductions are also achieved when fossil transportation fuels are replaced. - Abstract: Using a life cycle perspective, potentials for greenhouse gas emission reductions using various power-to-x processes via electrolysis have been compared. Because of increasing renewable electricity production, occasionally surplus renewable electricity is produced, which leads to situations where the price of electricity approach zero. This surplus electricity can be used in hydrogen, methane and methanol production via electrolysis and other additional processes. Life cycle assessments have been utilized to compare these options in terms of greenhouse gas emission reductions. All of the power-to-x options studied lead to greenhouse gas emission reductions as compared to conventional production processes based on fossil fuels. The highest greenhouse gas emission reductions can be gained when hydrogen from steam reforming is replaced by hydrogen from the power-to-x process. High greenhouse gas emission reductions can also be achieved when power-to-x products are utilized as an energy source for transportation, replacing fossil transportation fuels. A third option with high greenhouse gas emission reduction potential is methane production, storing and electricity conversion in gas engines during peak consumption hours. It is concluded that the power-to-x processes provide a good potential solution for reducing greenhouse gas emissions in various sectors.

  4. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    International Nuclear Information System (INIS)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-01-01

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed

  5. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    Energy Technology Data Exchange (ETDEWEB)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-05-22

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed.

  6. 40 CFR 60.1200 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 60.1200 Section 60.1200 Protection of Environment... SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is... Good Combustion Practices: Operating Requirements § 60.1200 What are the operating practice...

  7. Reservoir release patterns for hydropower operations at the Aspinall Unit on the Gunnison River, Colorado

    International Nuclear Information System (INIS)

    Yin, S.C.L.; Sedlacek, J.

    1995-05-01

    This report presents the development of reservoir release patterns for the Aspinall Unit, which includes Blue Mesa, Morrow Point, and Crystal Reservoirs on the Gunnison River in Colorado. Release patterns were assessed for two hydropower operational scenarios--seasonally adjusted steady flows and seasonally adjusted high fluctuating flows--and three representative hydrologic years--moderate (1987), dry (1989), and wet (1983). The release patterns for the operational scenarios were developed with the aid of monthly, daily, and hourly reservoir operational models, which simulate the linked operation of the three Aspinall Unit reservoirs. Also presented are reservoir fluctuations and downstream water surface elevations corresponding to the reservoir release patterns. Both of the hydropower operational scenarios evaluated are based on the ecological research flows proposed by the US Fish and Wildlife Service for the Aspinall Unit. The first operational scenario allows only seasonally adjusted steady flows (no hourly fluctuations at any dam within one day), whereas the second scenario permits high fluctuating flows from Blue Mesa and Morrow Point Reservoirs during certain times of the year. Crystal Reservoir would release a steady flow within each day under both operational scenarios

  8. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.J.

    1980-07-01

    The NRC plan defines the functional role of the NRC in cleanup operations at Three Mile Island Unit 2 to assure that agency regulatory responsibilities and objectives will be fulfilled. The plan outlines NRC functions in TMI-2 cleanup operations in the following areas: (1) the functional relationship of NRC to other government agencies, the public, and the licensee to coordinate activities, (2) the functional roles of these organizations in cleanup operations, (3) the NRC review and decision-making procedure for the licensee's proposed cleanup operation, (4) the NRC/licensee estimated schedule of major actions, and (5) NRC's functional role in overseeing implementation of approved licensee activities

  9. Knowledge Valorisation: A Route of Knowledge That Ends In Surplus Value (An Example of The Netherlands)

    Science.gov (United States)

    Hladchenko, Myroslava

    2016-01-01

    Purpose: The purpose of this paper is to explore the reasons of the success of the Netherlands in knowledge valorisation: what are the actors that participate in knowledge valorisation process and what are their functions; what is the route of knowledge in valorisation; what "surplus value" does knowledge gain in the valorisation…

  10. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  11. Development of Regulatory Audit Programs for Wolsong Unit 1 Continued Operation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hong Key; Nho, Seung Hwan; Song, Myung Ho [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2012-05-15

    Wolsong Unit 1 (PHWR type) design life expires on November 20, 2010. In relation to it, KHNP submitted its application to get approval of the MEST on December 30, 2009 and KINS is under review to confirm the appropriateness of continued operation. For the comprehensive review of Wolsong Unit 1 continued operation, KINS has developed the review guidelines for PHWR type reactor including a total of 39 aging management program (AMP) items and 7 time limited aging analysis (TLAA) items. Evaluations or calculations to verify the integrity of nuclear components are required for plant specific AMP and TLAA items as well as the ones specified in the guidelines. In this paper, audit calculation programs developed for KINS staff use in reviewing applicant's submitted evaluation results are presented

  12. Indian Point Station, Units 1, 2, and 3. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 remained in a shutdown condition pending a decision by the Company on the installation of an ECCS as required by NRC. Net electrical power generated by Unit 2 was 2,267,654 MWH with the unit on line 3,056.45 hrs. Unit 3 generated 1,872,947 MWH and was on line 2,286.01 hrs. Information is presented concerning operations, reportable events, corrective maintenance, fuel performance, radioactivity releases, shutdowns, primary coolant chemistry, and occupational radiation exposures

  13. Quad-Cities Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 2,024,125 net electrical MWH and the generator was on line 3162.6 hours. Unit 2 generated 746,184 net electrical MWH and was on line 1475.3 hrs. Data is included concerning operations, power generation, shutdowns, maintenance, changes, and tests. (FS)

  14. Low inflation, a high net savings surplus and institutional restrictions keep the Japanese long-term interest rate low

    NARCIS (Netherlands)

    Jansen, Pieter W.

    2006-01-01

    This paper explains that the interest rate on long-term Japanese government bonds is low in comparison with other industrialised countries for four main reasons: lower inflation, net savings surplus, institutional restrictions and home bias. Monetary policy and institutionalised purchases of

  15. Low intensity surplus activated sludge pretreatment before anaerobic digestion

    Directory of Open Access Journals (Sweden)

    Suschka Jan

    2017-12-01

    Full Text Available Sewage sludge (municipal, or industrial treatment is still a problem in so far that it is not satisfactorily resolved in terms of cost and final disposal. Two common forms of sludge disposal are possible; the first being direct disposal on land (including agriculture and the second being incineration (ash production, although neither of these methods are universally applied. Simplifying the issue, direct sludge disposal on land is seldom applied for sanitary and environmental reasons, while incineration is not popular for financial (high costs reasons. Very often medium and large wastewater treatment plants apply anaerobic digestion for sludge hygiene principles, reducing the amount to be disposed and for biogas (energy production. With the progress in sewage biological treatment aiming at nutrient removal, primary sludge has been omitted in the working processes and only surplus activated sludge requires handling. Anaerobic digestion of waste activated sludge (WAS is more difficult due to the presence of microorganisms, the decomposition of which requires a relatively long time for hydrolysis. In order to upgrade the hydrolysis effects, several different pre-treatment processes have already been developed and introduced. The additional pre-treatment processes applied are aimed at residual sludge bulk mass minimization, shortening of the anaerobic digestion process or higher biogas production, and therefore require additional energy. The water-energy-waste Nexus (treads of of the benefits and operational difficulties, including energy costs are discussed in this paper. The intensity of pre-treatment processes to upgrade the microorganism’s hydrolysis has crucial implications. Here a low intensity pre-treatment process, alkalisation and hydrodynamic disintegration - hybrid process - were presented in order to achieve sufficient effects of WAS anaerobic digestion. A sludge digestion efficiency increase expressed as 45% biogas additional

  16. Advanced Transport Operating System (ATOPS) control display unit software description

    Science.gov (United States)

    Slominski, Christopher J.; Parks, Mark A.; Debure, Kelly R.; Heaphy, William J.

    1992-01-01

    The software created for the Control Display Units (CDUs), used for the Advanced Transport Operating Systems (ATOPS) project, on the Transport Systems Research Vehicle (TSRV) is described. Module descriptions are presented in a standardized format which contains module purpose, calling sequence, a detailed description, and global references. The global reference section includes subroutines, functions, and common variables referenced by a particular module. The CDUs, one for the pilot and one for the copilot, are used for flight management purposes. Operations performed with the CDU affects the aircraft's guidance, navigation, and display software.

  17. Proposed plan for remedial action at the quarry residuals operable unit of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1998-03-01

    This proposed plan addresses the management of contamination present in various components of the quarry residuals operable unit (QROU) of the Weldon Spring site, which is located in St. Charles County, Missouri. The QROU consists of (1) residual waste at the quarry proper; (2) the Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek; and (3) quarry groundwater located primarily north of the slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of the evaluations for this operable unit. Remedial activities for the QROU will be conducted by the US Department of Energy (DOE) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of the remedial investigation/feasibility study (RI/FS) process required for the QROU under CERCLA, three major evaluation documents have been prepared to support cleanup decisions for this operable unit. decisions for this operable unit

  18. How Can the United States Army Improve Human Intelligence in Peace Operations?

    National Research Council Canada - National Science Library

    Wright, David

    2003-01-01

    .... These secondary collectors, such as the Military Police, Psychological Operations, Civil Affairs and Line Units conduct liaison with international and local police forces, host-government official...

  19. Steam generator tube integrity requirements and operating experience in the United States

    International Nuclear Information System (INIS)

    Karwoski, K.J.

    2009-01-01

    Steam generator tube integrity is important to the safe operation of pressurized-water reactors. For ensuring tube integrity, the U.S. Nuclear Regulatory Commission uses a regulatory framework that is largely performance based. This performance-based framework is supplemented with some prescriptive requirements. The framework recognizes that there are three combinations of tube materials and heat treatments currently used in the United States and that the operating experience depends, in part, on the type of material used. This paper summarizes the regulatory framework for ensuring steam generator tube integrity, it highlights the current status of steam generators, and it highlights some of the steam generator issues and challenges that exist in the United States. (author)

  20. An operating nuclear utility's experience with the ALARA design of a new nuclear unit

    International Nuclear Information System (INIS)

    Rodgers, R.C.

    1985-01-01

    This talk presents a review of how operating experience at Northeast Utilities has been factored into the design of a new nuclear unit and the development and management of the radiation protection program. Their operational experience has indicated that there are two facets to keeping radiation exposures ALARA. The first is the proper ALARA design of the unit. The other facet is the design of a comprehensive radiation protection program. The author discusses these facets in some detail

  1. Operator support system for power unit control in abnormal modes of operation

    International Nuclear Information System (INIS)

    Kurka, J.

    1993-01-01

    I and C system technology, partly Soviet and partly Czechoslovakian, used on the NPP Dukovany units represents the control technology standard of late 70-ties and it becomes the weak part of the whole system. The modernization of the system, therefore, is necessary and it is already in preparation. The specification of both the scope and the depth of upgrading/replacement is being carried out within the framework of the PHARE program. The second phase of the program aimed at the final specifications of requirements on new I and C system is in progress. The output will serve as detailed specification for bid invitation for control system supplier. Parallely, the preparation of specification for WWER-440 full-scope plant simulator for operator training is in progress as well. In the case of two units with WWER-1000 MW reactors, the completion of construction of which was even threaten for a certain period of time, essential changes have taken place in the design of both the I and C systems and the reactor core. 7 figs

  2. Application of total care time and payment per unit time model for physician reimbursement for common general surgery operations.

    Science.gov (United States)

    Chatterjee, Abhishek; Holubar, Stefan D; Figy, Sean; Chen, Lilian; Montagne, Shirley A; Rosen, Joseph M; Desimone, Joseph P

    2012-06-01

    The relative value unit system relies on subjective measures of physician input in the care of patients. A payment per unit time model incorporates surgeon reimbursement to the total care time spent in the operating room, postoperative in-house, and clinic time to define payment per unit time. We aimed to compare common general surgery operations by using the total care time and payment per unit time method in order to demonstrate a more objective measurement for physician reimbursement. Average total physician payment per case was obtained for 5 outpatient operations and 4 inpatient operations in general surgery. Total care time was defined as the sum of operative time, 30 minutes per hospital day, and 30 minutes per office visit for each operation. Payment per unit time was calculated by dividing the physician reimbursement per case by the total care time. Total care time, physician payment per case, and payment per unit time for each type of operation demonstrated that an average payment per time spent for inpatient operations was $455.73 and slightly more at $467.51 for outpatient operations. Partial colectomy with primary anastomosis had the longest total care time (8.98 hours) and the least payment per unit time ($188.52). Laparoscopic gastric bypass had the highest payment per time ($707.30). The total care time and payment per unit time method can be used as an adjunct to compare reimbursement among different operations on an institutional level as well as on a national level. Although many operations have similar payment trends based on time spent by the surgeon, payment differences using this methodology are seen and may be in need of further review. Copyright © 2012 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

  3. Explicit isospectral flows for the AKNS operator on the unit interval

    International Nuclear Information System (INIS)

    Amour, L

    2009-01-01

    We consider the AKNS operator on the unit interval. The boundary conditions are self-adjoint separated boundary conditions. For fixed boundary conditions, we make the formulae for flows induced by general tangent vector fields on isospectral sets explicit

  4. Pilgrim Nuclear Power Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    Net electrical power generated was 2,415,511 MWH with the generator on line 5,333.6 hrs. Information is presented concerning operations, procedure changes, tests, experiments, maintenance, unit shutdowns and power reductions, and radiation doses to personnel

  5. Salem Nuclear Generating Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Initial reactor criticality was achieved 12/11/76 and power generation began 12/25/76. Information is presented concerning operation, maintenance, procedure and specification changes, power generation, unit shutdowns and forced power reductions, testing, and personnel radiation exposures

  6. Operational aerial snow surveying in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Peck, E L; Carroll, T R; Vandemark, S C

    1980-03-01

    An airborne gamma radiation detector and data acquisition system has been designed for rapid measurement of the snow cover water equivalent over large open areas. Research and field tests conducted prior to the implementation of an operational snow measurement system in the United States are reviewed. Extensive research test flights were conducted over large river basins of the north-central plains and in the high mountain valleys of the inter-mountain West. Problems encountered during development include: (1) error in the gross gamma flux produced by atmospheric radon gas daughters; (2) spatial and temporal variability in soil moisture; and (3) errors in gamma radiation count rate introduced by aircraft and cosmic background radiation. Network design of operational flight line and ground observation data used in a river forecasting system are discussed. 22 references, 4 figures, 2 tables.

  7. LANL MOX fuel lead assemblies data report for the surplus plutonium disposition environmental impact statement

    International Nuclear Information System (INIS)

    Fisher, S.E.; Holdaway, R.; Ludwig, S.B.

    1998-08-01

    The purpose of this document is to support the US Department of Energy (DOE) Fissile Materials Disposition Program's preparation of the draft surplus plutonium disposition environmental impact statement. This is one of several responses to data call requests for background information on activities associated with the operation of the lead assembly (LA) mixed-oxide (MOX) fuel fabrication facility. LANL has proposed an LA MOX fuel fabrication approach that would be done entirely inside an S and S Category 1 area. This includes receipt and storage of PuO 2 powder, fabrication of MOX fuel pellets, assembly of fuel rods and bundles, and shipping of the packaged fuel to a commercial reactor site. Support activities will take place within both Category 1 and 2 areas. Technical Area (TA) 55/Plutonium Facility 4 will be used to store the bulk PuO 2 powder, fabricate MOX fuel pellets, assemble rods, and store fuel bundles. Bundles will be assembled at a separate facility, several of which have been identified as suitable for that activity. The Chemistry and Metallurgy Research Building (at TA-3) will be used for analytical chemistry support. Waste operations will be conducted in TA-50 and TA-54. Only very minor modifications will be needed to accommodate the LA program. These modifications consist mostly of minor equipment upgrades. A commercial reactor operator has not been identified for the LA irradiation. Postirradiation examination (PIE) of the irradiated fuel will take place at either Oak Ridge National Laboratory or ANL-W. The only modifications required at either PIE site would be to accommodate full-length irradiated fuel rods. Results from this program are critical to the overall plutonium distribution schedule

  8. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    International Nuclear Information System (INIS)

    Mellor, S.P.; Matthee, F.W.

    2002-01-01

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  9. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    Energy Technology Data Exchange (ETDEWEB)

    Mellor, S.P.; Matthee, F.W. [ESKOM, Koeberg Nuclear Power Station (South Africa)

    2002-07-01

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  10. Developmental competence of oocytes isolated from surplus medulla tissue in connection with cryopreservation of ovarian tissue for fertility preservation

    DEFF Research Database (Denmark)

    Wilken-Jensen, Helle N; Kristensen, Stine G; Jeppesen, Janni V

    2014-01-01

    OBJECTIVE: Evaluating the developmental competence of immature oocytes collected from surplus medulla tissue in connection with ovarian tissue cryopreservation for fertility preservation. DESIGN: Cohort comparative study. SETTING: University laboratory in Denmark from 2011-2012. POPULATION: 69...

  11. Farm structure or farm management: effective ways to reduce nutrient surpluses on dairy farms and their financial impacts

    NARCIS (Netherlands)

    Ondersteijn, C.J.M.; Beldman, A.C.G.; Daatselaar, C.H.G.; Giesen, G.W.J.; Huirne, R.B.M.

    2003-01-01

    .To control and prevent nutrient pollution from agricultural non-point sources, the Dutch government introduced the Mineral Accounting System (MINAS), a nutrient bookkeeping system which taxes farms with nutrient surpluses exceeding safe threshold values. Since the levies can be severe it is

  12. RCRA facility investigation report for the 200-PO-1 operable unit. Revision 1

    International Nuclear Information System (INIS)

    1997-05-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) report is prepared in support of the RFI/corrective measures study process for the 200-PO-1 Groundwater Operable Unit in the 200 East Area of the Hanford Site. This report summarizes existing information on this operable unit presented in the 200 East and PUREX Aggregate Area Management Study Reports, contaminant specific studies, available modeling data, and groundwater monitoring data summary reports. Existing contaminant data are screened against current regulatory limits to determine contaminants of potential concern (COPC). Each identified COPC is evaluated using well-specific and plume trend analyses

  13. Commercial operation and outage experience of ABWR at Kashiwazaki-Kariwa units Nos. 6 and 7

    International Nuclear Information System (INIS)

    Anahara, N.; Yamada, M.; Kataoka, H.

    2000-01-01

    Kashiwazaki-Kariwa Nuclear Power Station Units Nos. 6 and 7, the world's first ABWRs (Advanced Boiling Water Reactor), started commercial operation on November 7, 1996 and July 2, 1997, respectively, and continued their commercial operation with a high capacity factor, low occupational radiation exposure and radioactive waste. Units 6 and 7 were in their 3rd cycle operation until 25th April 1999 and 1st November 1999, respectively. Thermal efficiency was 35.4-35.8% (design thermal efficiency: 34.5%) during these period, demonstrating better performance than that of BWR-5 (design thermal efficiency: 33.4%). Nos. 6 and 7 have experienced 2 annual outages. The first outage of unit No. 6 started on November 20, 1997 and was completed within 61 days (including 6 New Year holidays), and the second outage started on March 13, 1999 and was completed within 44 days. The first annual outage of unit No. 7 started on May 27, 1998, earlier than it would normally have been, to avoid an annual outage during the summer, and was completed within 55 days, and the second outage started on September 18th, 1999 and was completed within 45 days, All annual outages were carried out within a very short time period without any severe malfunctions, including newly designed ABWR systems and equipment. As the first outage in Japan, 55 days is a very short period, despite the fact that the Nos. 6 and 7 are the first ABWRs in the world and the largest capacity units in Japan. The total occupational radiation exposure of No. 6 was 300 man-mSv (1st outage) and 331 man-mSv (2nd outage). That of Unit 7 was 153 man-mSv (1st outage) Those of unit No. 6 were at the same level as those of unit No. 3, which is the latest design 1100MW(e) BWR-5. That of unit No. 7 was the lowest ever at Kashiwazaki-Kariwa nuclear power station. The drums of radioactive waste discharged during the annual outage numbered 54 (1st outage) for No. 6 and 62 (1st outage) for No. 7, which was less than the design target of 100

  14. Foundations of a Marxist Theory of the Political Economy of Information: Trade Secrets and Intellectual Property, and the Production of Relative Surplus Value and the Extraction of Rent-Tribute

    Directory of Open Access Journals (Sweden)

    Jakob Rigi

    2014-12-01

    Full Text Available The aim of this article is to sketch a preliminary outline of a Marxist theory of the political economy of information. It defines information as a symbolic form that can be digitally copied. This definition is purely formal and disregards epistemological, ideological, and functional aspects. The article argues that the value of information defined in this sense tends to zero and therefore the price of information is rent. However, information plays a central role in the production of relative surplus value on the one hand, and the distribution of the total social surplus value in forms of surplus profits and rents, on the other. Thus, the hegemony of information technologies in contemporary productive forces has not made Marx’s theory of value irrelevant. On the contrary, the political economy of information can only be understood in the light of this theory. The article demonstrates that the capitalist production and distribution of surplus value at the global level forms the foundation of the political economy of information.

  15. 100-BC-1 Operable Unit focused feasibility study

    International Nuclear Information System (INIS)

    Day, R.E.

    1994-01-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act feasibility study includes development and screening of alternatives (Phases 1 and 2) and the detailed analysis of alternatives (Phase 3). This focused feasibility study constitutes the Phase 3 portion of the feasibility study process for the remedial alternatives initially developed and screened in the 100 Area Feasibility Study Phases 1 and 2 (DOE-RL 1993a). The focused feasibility study process is conducted in two stages, a Process Document (DOE-RL 1994a) and an operable unit-specific focused feasibility study document, such as this one. The focused feasibility study process is performed by implementing a ''plug-in'' style approach; as defined in greater detail in the Process Document, which is a companion to this document. The objective of this focused feasibility study is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures for candidate waste sites associated with the 100-BC-1 Operable Unit which is located in the north-central part of the Hanford Site. The interim remedial measure candidate waste sites are determined in the Limited Field Investigation (DOE-RL 1993b). Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  16. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented

  17. Policy, planning and generation of energy surpluses in a sugar and alcohol plants; Politica, planejamento e geracao de excedentes de energia eletrica no setor sucroalcooleiro

    Energy Technology Data Exchange (ETDEWEB)

    Agarussi, Maria Alessandra Silva Nunes; Martins, Juliana Marinho Cavalcanti [Universidade Estadual de Campinas (UNICAMP), SP (Brazil). Curso de Pos-Graduacao em Planejamento de Sistemas Energeticos

    2008-07-01

    This present work has as it main purpose to analyze briefly the Decenal Plan of Energy Expansion and the National Energy Plan 2030 in relation to the surplus energy cogeneration capacity from sugar and alcohol industry in Brazil. At the same time, this work also intends to compare the existent public policies to foment the surplus electric energy production such as the Proinfa and energy auctions and the acquisition of more efficient cogeneration systems by the sugar cane sector. (author)

  18. Remedial investigation for the 200-BP-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Buckmaster, M.A.

    1991-01-01

    The Hanford Site, Richland, Washington, contains over 1500 identified waste sites that will be characterized and remediated over the next 30 years. In support of the ''Hanford Federal Facility Agreement and Consent Order,'' the US Department of Energy has initiated a remedial investigation/feasibility study (RI/FS) at the 200-BP-1 operable unit. The 200-BP-1 RI is the first Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) investigation on the Hanford Site that involves drilling into highly radioactive and chemically contaminated soils. The initial phase of the site characterization is oriented toward determining the nature and extent of any contamination present in the vicinity of the 200-BP-1 operable unit. The major focus of the Phase I RI is the drilling and sampling of 10 inactive waste disposal units which received low level radioactive liquid waste

  19. Risk-based decision analysis for groundwater operable units

    International Nuclear Information System (INIS)

    Chiaramonte, G.R.

    1995-01-01

    This document proposes a streamlined approach and methodology for performing risk assessment in support of interim remedial measure (IRM) decisions involving the remediation of contaminated groundwater on the Hanford Site. This methodology, referred to as ''risk-based decision analysis,'' also supports the specification of target cleanup volumes and provides a basis for design and operation of the groundwater remedies. The risk-based decision analysis can be completed within a short time frame and concisely documented. The risk-based decision analysis is more versatile than the qualitative risk assessment (QRA), because it not only supports the need for IRMs, but also provides criteria for defining the success of the IRMs and provides the risk-basis for decisions on final remedies. For these reasons, it is proposed that, for groundwater operable units, the risk-based decision analysis should replace the more elaborate, costly, and time-consuming QRA

  20. 77 FR 42076 - Notice of Opportunity for Public Comment on Surplus Property Release at Hancock County-Bar Harbor...

    Science.gov (United States)

    2012-07-17

    ... Comment on Surplus Property Release at Hancock County-Bar Harbor Airport, Trenton, ME AGENCY: Federal... located at Hancock County-Bar Harbor Airport, Trenton, Maine. DATES: Comments must be received on or... INFORMATION: The Federal Aviation Administration is reviewing a request by Hancock County-Bar Harbor Airport...

  1. A Multiagent System for Autonomous Operation of Islanded Microgrids Based on a Power Market Environment

    Directory of Open Access Journals (Sweden)

    Myong-Chul Shin

    2010-12-01

    Full Text Available One of the most important requirements of microgrid operation is to maintain a constant frequency such as 50 Hz or 60 Hz, which is closely related to a power balance between supply and demand. In general, microgrids are connected to power grids and surplus/shortage power of microgrids is traded with power grids. Since islanded microgrids are isolated from any power grids, the decrease in generation or load-shedding can be used to maintain the frequency when a power imbalance between supply and demand occurs. The power imbalance restricts the electricity use of consumers in the case of supply shortage and the power supply of suppliers in the case of supply surplus. Therefore, the islanded microgrid should be operated to reduce power imbalance conditions. Meanwhile, the microgrid is a small-scale power system and the employment of skillful operators for effective operation of its components requires high costs. Therefore, automatic operation of the components is effective realistically. In addition, the components are distributed in the microgrid and their operation should consider their owners’ profits. For these reasons, a multiagent system application can be a good alternative for microgrid operation. In this paper, we present a multiagent system for autonomous operation of the islanded microgrid on a power market environment. The proposed multiagent system is designed based on a cooperative operation scheme. We show the functionality and the feasibility of the proposed multiagent system through several tests.

  2. A multiagent system for autonomous operation of islanded microgrids based on a power market environment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, H.-M. [Department of Electrical Engineering, University of Incheon/12-1, Sondo-dong, Yeonsu-gu, Incheon, 406-840 (Korea, Republic of); Kinoshita, T. [Graduate School of Information Science, Tohoku University/2-1-1, Katahira, Aoba-ku, Sendai, 980-8577 (Japan); Shin, M.-Ch. [School of Information and Communication Engineering, Sungkyunkwan University/300, Cheoncheon-dong, Jangan-gu, Suwon, Gyeonggi-do, 440-746 (Korea, Republic of)

    2010-12-15

    One of the most important requirements of microgrid operation is to maintain a constant frequency such as 50 Hz or 60 Hz, which is closely related to a power balance between supply and demand. In general, microgrids are connected to power grids and surplus/shortage power of microgrids is traded with power grids. Since islanded microgrids are isolated from any power grids, the decrease in generation or load-shedding can be used to maintain the frequency when a power imbalance between supply and demand occurs. The power imbalance restricts the electricity use of consumers in the case of supply shortage and the power supply of suppliers in the case of supply surplus. Therefore, the islanded microgrid should be operated to reduce power imbalance conditions. Meanwhile, the microgrid is a small-scale power system and the employment of skillful operators for effective operation of its components requires high costs. Therefore, automatic operation of the components is effective realistically. In addition, the components are distributed in the microgrid and their operation should consider their owners' profits. For these reasons, a multiagent system application can be a good alternative for microgrid operation. In this paper, we present a multiagent system for autonomous operation of the islanded microgrid on a power market environment. The proposed multiagent system is designed based on a cooperative operation scheme. We show the functionality and the feasibility of the proposed multiagent system through several tests. (authors)

  3. Operation time extension for power units of the first generation NPP and the liability for potential damage

    International Nuclear Information System (INIS)

    Kovalevich, O.M.

    2000-01-01

    The problem on the operation time extension for the six operating NPP first generation power units is discussed. However it is not advisable to improve the safety of these power units up to the acceptable level, therefore there arises the contradiction between the operation time extension of these power units and potential damage for the population. The possibility of having the increased civilian-legal responsibility for potential harm and losses in case of an accident is proposed to be considered as a compensating measure. The measures for realization of this civilian-legal responsibility are described [ru

  4. Browns Ferry Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Units 1 and 2 were down for the first half of the year caused by the fire of March 1975. Net electrical power generated by Unit 1 this year was 1,301,183 MWH with the generator on line 2,175.25 hrs. Unit 2 generated 1,567,170 MWH with the generator on line 2,548.73 hrs. Unit 3 began full power operation on November 20th and generated 1,416,891 MWH with the generator on line 2,058.20 hrs. Information is presented concerning operations, fuel performance, surveillance testing, containment leak testing, changes, power generation, shutdown and forced reductions, coolant chemistry, occupational radiation exposures, and maintenance

  5. Operating of mobile machine units system using the model of multicomponent complex movement

    OpenAIRE

    A. Lebedev; R. Kaidalov; N. Artiomov; M. Shulyak; M. Podrigalo; D. Abramov; D. Klets

    2015-01-01

    To solve the problems of mobile machine units system operating it is proposed using complex multi-component (composite) movement physical models. Implementation of the proposed method is possible by creating of automatic operating systems of fuel supply to the engines using linear accelerometers. Some examples to illustrate the proposed method are offered.

  6. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  7. Estimation of the optimal operating conditions for a radiation chemical neutralization unit

    International Nuclear Information System (INIS)

    Putilov, A.V.; Kamenetskaya, S.A.; Pshezhetskii, S.Ya.; Kazakov, M.S.; Kudryavtsev, S.L.; Petrukhin, N.V.; Misharin, B.A.; Koneev, V.Z.

    1985-01-01

    An estimate is made of the effect of the hydrodynamic conditions on the efficiency of foam units for the radiation chemical neutralization of impurities, taking into account the penetrating power of accelerated electrons having various energies. Expressions are obtained for calculating the efficiency of such units with sectionized operation of the chamber and taking account of the effect of incomplete mixing of the products of radiolysis through the height of the foam layer

  8. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    International Nuclear Information System (INIS)

    Richard P. Wells

    2007-01-01

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year

  9. OPERATING OF MOBILE MACHINE UNITS SYSTEM USING THE MODEL OF MULTICOMPONENT COMPLEX MOVEMENT

    Directory of Open Access Journals (Sweden)

    A. Lebedev

    2015-07-01

    Full Text Available To solve the problems of mobile machine units system operating it is proposed using complex multi-component (composite movement physical models. Implementation of the proposed method is possible by creating of automatic operating systems of fuel supply to the engines using linear accelerometers. Some examples to illustrate the proposed method are offered.

  10. LANL MOX fuel lead assemblies data report for the surplus plutonium disposition environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, S.E.; Holdaway, R.; Ludwig, S.B. [and others

    1998-08-01

    The purpose of this document is to support the US Department of Energy (DOE) Fissile Materials Disposition Program`s preparation of the draft surplus plutonium disposition environmental impact statement. This is one of several responses to data call requests for background information on activities associated with the operation of the lead assembly (LA) mixed-oxide (MOX) fuel fabrication facility. LANL has proposed an LA MOX fuel fabrication approach that would be done entirely inside an S and S Category 1 area. This includes receipt and storage of PuO{sub 2} powder, fabrication of MOX fuel pellets, assembly of fuel rods and bundles, and shipping of the packaged fuel to a commercial reactor site. Support activities will take place within both Category 1 and 2 areas. Technical Area (TA) 55/Plutonium Facility 4 will be used to store the bulk PuO{sub 2} powder, fabricate MOX fuel pellets, assemble rods, and store fuel bundles. Bundles will be assembled at a separate facility, several of which have been identified as suitable for that activity. The Chemistry and Metallurgy Research Building (at TA-3) will be used for analytical chemistry support. Waste operations will be conducted in TA-50 and TA-54. Only very minor modifications will be needed to accommodate the LA program. These modifications consist mostly of minor equipment upgrades. A commercial reactor operator has not been identified for the LA irradiation. Postirradiation examination (PIE) of the irradiated fuel will take place at either Oak Ridge National Laboratory or ANL-W. The only modifications required at either PIE site would be to accommodate full-length irradiated fuel rods. Results from this program are critical to the overall plutonium distribution schedule.

  11. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  12. Feasibility Study for Operable Unit 7-13/14

    International Nuclear Information System (INIS)

    K. Jean Holdren Thomas E. Bechtold Brian D. Preussner

    2007-01-01

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision

  13. Feasibility Study for Operable Unit 7-13/14

    Energy Technology Data Exchange (ETDEWEB)

    K. Jean Holdren

    2007-05-29

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision.

  14. Aquatic studies at the 100-HR-3 and 100-NR-1 operable units

    International Nuclear Information System (INIS)

    Cushing, C.E.

    1993-04-01

    Pacific Northwest Laboratory initiated a program to characterize selected aquatic biological populations to determine (1) existing levels of inorganic chemical and radionuclide contamination, and (2) the populations' suitability as indicators of chemical releases during cleanup activities at the US Department of Energy's Hanford Site. Following work plans for the ground-water operable units, lower trophic levels in the aquatic habitat (periphyton and caddisfly larvae) were evaluated for contaminants at the 100-HR-3 Operable Unit and 100-NR-1 Operable Unit. The results were evaluated to determine the need for further sampling. If the results showed no significant contamination compared to upriver levels, sampling would be discontinued. The periphyton community appears to be suitable for determining contamination levels. Baseline concentrations for stable chromium were established and will be useful for comparing samples collected when contaminant release is expected. Concentrations of 60 Co, 90 Sr, and 137 Cs in periphyton were essentially below detectable limits, which will also make this community useful in detecting potential releases of radionuclides during cleanup activities. Levels for both stable chromium and radionuclides were essentially below detection limits for caddisfly larvae. Thus, these organisms may be used to monitor suspected contaminant releases from cleanup activities; if concentrations exceed detection limits, they may be related to these activities. Two candidate threatened and endangered species of molluscs occur in the Hanford Reach of the Columbia River. These are the shortface lanx (Fisherola nuttalli), which is a Washington State candidate species, and the Columbia pebblesnail (Fluminicola columbiana), which is both a state and federal candidate species. Specimens of the shortface lanx were observed in the vicinity of N Springs (100-NR-1 Operable Unit); they likely occur throughout this area

  15. Unit operation in food manufacturing and processing. Shokuhin seizo/kako ni okeru tan'i sosa

    Energy Technology Data Exchange (ETDEWEB)

    Matsuno, R. (Kyoto Univ., Kyoto (Japan). Faculty of Aguriculture)

    1993-09-05

    Processed foods must be produced in mass, cheap and safe and should be suitable for the delicate taste of human being. Food tastes are effected by an outlook on human attitude, and the surrounding environment. And these factors are reflected to unit operation in food manufacturing and processing and it is clarified that there are many technical difficulties. The characteristics of unit operation for food manufacturing and processing are that the food materials are a multicomponent system, moreover, a very small amount of aroma components, taste components, vitamin, physiologically activation materials and so on are more important than the main components, and also inapplicable of the model centering to the most quantitative component. The purpose of unit operation in food manufacturing and processing is to produce the properties of matter matching to human sense, and therefore there are many problems left unsolved. The development of analytical technology also has an influence on manufacturing and processing technology. Consequently, food manufacturing and processing technology must be based on general science. It is necessary to develop unit operation with an understanding of mutual effect between food and human body.

  16. 77 FR 30047 - Notice of Opportunity for Public Comment on Surplus Property Release at Michael J Smith Field...

    Science.gov (United States)

    2012-05-21

    ... Comment on Surplus Property Release at Michael J Smith Field, Beaufort, NC AGENCY: Federal Aviation... J Smith Field, be used for aeronautical purposes. DATES: Comments must be received on or before June... property at the Michael J Smith Field. The property consists of one parcel located on the north side of...

  17. Day-Ahead Coordination of Vehicle-to-Grid Operation and Wind Power in Security Constraints Unit Commitment (SCUC)

    OpenAIRE

    Mohammad Javad Abdollahi; Majid Moazzami

    2015-01-01

    In this paper security constraints unit commitment (SCUC) in the presence of wind power resources and electrical vehicles to grid is presented. SCUC operation prepare an optimal time table for generation unit commitment in order to maximize security, minimize operation cost and satisfy the constraints of networks and units in a period of time, as one of the most important research interest in power systems. Today, the relationship between power network and energy storage systems is interested...

  18. Hanford MOX fuel lead assemblies data report for the surplus plutonium disposition environmental impact statement

    International Nuclear Information System (INIS)

    O'Connor, D.G.; Fisher, S.E.; Holdaway, R.

    1998-08-01

    The purpose of this document is to support the US Department of Energy (DOE) Fissile Materials Disposition Program's preparation of the draft surplus plutonium disposition environmental impact statement. This is one of several responses to data call requests for background information on activities associated with the operation of the lead assembly (LA) mixed-oxide (MOX) fuel fabrication facility. DOE-MD requested that the DOE Site Operations Offices nominate DOE sites that meet established minimum requirements that could produce MOX LAs. Six initial site combinations were proposed: (1) Argonne National Laboratory-West (ANL-W) with support from Idaho National Engineering and Environmental Laboratory (INEEL), (2) Hanford, (3) Los Alamos National Laboratory (LANL) with support from Pantex, (4) Lawrence Livermore National Laboratory (LLNL), (5) Oak Ridge Reservation (ORR), and (6) Savannah River Site (SRS). After further analysis by the sites and DOE-MD, five site combinations were established as possible candidates for producing MOX LAs: (1) ANL-W with support from INEEL, (2) Hanford, (3) LANL, (4) LLNL, and (5) SRS. Hanford has proposed an LA MOX fuel fabrication approach that would be done entirely inside an S and S Category 1 area. An alternate approach would allow fabrication of fuel pellets and assembly of fuel rods in an S and S Category 1 facility. In all, a total of three LA MOX fuel fabrication options were identified by Hanford that could accommodate the program. In every case, only minor modification would be required to ready any of the facilities to accept the equipment necessary to accomplish the LA program

  19. Hanford MOX fuel lead assemblies data report for the surplus plutonium disposition environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    O`Connor, D.G.; Fisher, S.E.; Holdaway, R. [and others

    1998-08-01

    The purpose of this document is to support the US Department of Energy (DOE) Fissile Materials Disposition Program`s preparation of the draft surplus plutonium disposition environmental impact statement. This is one of several responses to data call requests for background information on activities associated with the operation of the lead assembly (LA) mixed-oxide (MOX) fuel fabrication facility. DOE-MD requested that the DOE Site Operations Offices nominate DOE sites that meet established minimum requirements that could produce MOX LAs. Six initial site combinations were proposed: (1) Argonne National Laboratory-West (ANL-W) with support from Idaho National Engineering and Environmental Laboratory (INEEL), (2) Hanford, (3) Los Alamos National Laboratory (LANL) with support from Pantex, (4) Lawrence Livermore National Laboratory (LLNL), (5) Oak Ridge Reservation (ORR), and (6) Savannah River Site (SRS). After further analysis by the sites and DOE-MD, five site combinations were established as possible candidates for producing MOX LAs: (1) ANL-W with support from INEEL, (2) Hanford, (3) LANL, (4) LLNL, and (5) SRS. Hanford has proposed an LA MOX fuel fabrication approach that would be done entirely inside an S and S Category 1 area. An alternate approach would allow fabrication of fuel pellets and assembly of fuel rods in an S and S Category 1 facility. In all, a total of three LA MOX fuel fabrication options were identified by Hanford that could accommodate the program. In every case, only minor modification would be required to ready any of the facilities to accept the equipment necessary to accomplish the LA program.

  20. Management of surplus electricity-production from a fluctuating renewable-energy source

    International Nuclear Information System (INIS)

    Lund, H.

    2003-01-01

    Renewable-energy sources and energy efficiency are important elements in Danish Energy Policy. The implementation of wind power and combined heat- and power-production (CHP) have already led to substantial fuel savings, and both technologies are intended for further expansion in the coming decade. Today, approximately 50% of both Danish electricity and heat demand are produced via CHP, and more than 15% of the electricity demands are produced by wind turbines. However, the electricity production from these technologies is linked to fluctuations either in wind or in heat demands rather than fluctuations in demand for electricity. Consequently, the electricity production exceeds the demand during certain periods and creates a problem of ''surplus production''. This paper discusses and analyses different national strategies for solving this problem. (author)

  1. Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 successfully completed its first core cycle with unit availability of 95.2 percent. Saltwater leakage into the condenser continues to be a problem. Unit 2 achieved initial criticality November 30 and was initially paralleled to the Baltimore system on December 7. Information is presented concerning operations, specifications, maintenance, shutdowns and power reduction, and personnel exposures

  2. Evaluating the Efficiency of Intensive Care Unit Departments in Hospitals Affiliated with Yazd University of Medical Sciences Using Data Envelopment Analysis

    Directory of Open Access Journals (Sweden)

    Mahdieh Abedi

    2017-06-01

    Conclusion: Excess human and capital resources costs are a heavy burden for hospitals to bear and surplus production factors paly a substantial role in decreasing hospitals’ costs. So, intensive care units with efficiencies of less than 1 are recommended to decrease their excess resources to achieve the optimal efficiency.

  3. Sequential survey of the occurrence and the possible effects of a 226Ra surplus in harbour slurry polder grounds: Definition study

    International Nuclear Information System (INIS)

    Stoop, P.; Lembrechts, J.

    1993-11-01

    Sediments in the harbors of Rotterdam contain relatively large amounts of naturally occurring radionuclides resulting from emissions of the ore-processing industries (88Be, 92Be). Using harbour sludge as a landfill for polders has locally caused the 226 Ra contents of the soil to be a factor of 4 higher than the expected 226 Ra background. In polders where 226 Ra was measured, the 226 Ra surplus was found to be proportional to the cadmium contents (92Mo). Data on cadmium contents are available for many polders and therefore, cadmium may be useful as a tracer for enhanced levels of 226 Ra. Enhanced levels of 226 Ra may cause higher radon concentrations in dwellings that are built on these soils. Therefore, an extensive research programme is started to study the relation between the 226 Ra contents of the soil and radon concentrations in dwellings. The Laboratory of Radiation Research of RIVM has proposed to set up a sub-programme, focusing on the sites where harbour sludges have been dumped, with the following goals: 1) to investigate if there are dwellings with enhanced radon concentrations as a result of a 226 Ra surplus and 2) to investigate if the relation between the 226 Ra-surplus and the cadmium contents found is generally valid and useful. In this report we describe how this sub-programme may be set up and we give specific advice on the answers to various choices. We propose a.o. to use soil samples from 30 polders to investigate the relation between the 226 Ra surplus and the cadmium contents and to study in eight polders the possible consequences of enhanced 226 Ra levels for the radon concentrations in dwellings. Because the radon measurements take one year (four measurements averaged over three month) we propose that simple diagnostic measurements are made simultaneously with the radon measurements. These additional measurements include measurements of the groundwater table and of the effective ventilation pattern in the dwelling. 1 fig., 5 tabs., 16

  4. Survey Method for Radiological Surveys of 300-FF-1 Operable Unit Soils and Material

    International Nuclear Information System (INIS)

    Brehm, D.M.

    1998-06-01

    This technical basis is to be used to survey soils at the 300-FF-1 Operable Unit during remediation of the site. Its purpose is to provide a basis for the survey methods to be employed by radiological control technician (RCTs) to guide the excavation effort in accordance with the 300-FF-1 waste site Record of Decision (ROD). The ROD for the 300-FF-1 Operable Unit requires selective excavation, removal, and disposal of contaminated soil above 350 pCi/g total uranium activity. Soil above this level will be disposed of as radioactive waste. The remaining soil will remain onsite

  5. INEL Operable Unit 7-13 containment and stabilization configuration option

    International Nuclear Information System (INIS)

    Raivo, B.D.; Richardson, J.G.; Nickelson, D.F.

    1993-05-01

    A containment and stabilization configuration option has been developed for the Idaho National Engineering Laboratory's Subsurface Disposal Area Operable Unit 7-13, the transuranic (TRU)-contaminated waste pits and trenches. The configuration option is presented as an end-to-end system block diagram. Functional subelements are separately discussed, and technical background information, assumptions, input, high-level subelement requirements, and output are presented for each option

  6. Oconee Nuclear Station, Units 1, 2, and 3. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Information is presented concerning operations, performance characteristics, changes, tests, inspections, containment leak tests, maintenance, primary coolant chemistry, station staff changes, reservoir investigations, plume mapping, and operational environmental radioactivity monitoring data for oconee Units 1, 2, and 3. The non-radiological environmental surveillance program is also described. (FS)

  7. Design and operational parameters of transportable supercritical water oxidation waste destruction unit

    International Nuclear Information System (INIS)

    McFarland, R.D.; Brewer, G.R.; Rofer, C.K.

    1991-12-01

    Supercritical water oxidation (SCWO) is the destruction of hazardous waste by oxidation in the presence of water at temperatures and pressures above its critical point. A 1 gal/h SCWO waste destruction unit (WDU) has been designed, built, and operated at Los Alamos National Laboratory. This unit is transportable and is intended to demonstrate the SCWO technology on wastes at Department of Energy sites. This report describes the design of the WDU and the preliminary testing phase leading to demonstration

  8. The quality of operative notes at a general surgery unit.

    Science.gov (United States)

    Rogers, A; Bunting, M; Atherstone, A

    2008-09-01

    With the increasingly litigious nature of medical practice, accurate documentation is critical. This is particularly true for operative procedures, and medical councils have identified this and published guidelines to aid surgeons. However, these remain a frequently cited weakness in their defence in medico-legal cases. This study assessed the accuracy of operative notes in a general surgery unit in order to improve our practice. An audit of 100 consecutive operative notes was performed, and notes were assessed using the Royal College of Surgeons guidelines. The quality of note-taking of trainees was compared with that of consultant surgeons. A series of operation note pro formas was designed in response to the findings. Of the notes, 66% were completed by trainees. The vast majority of notes had no diagram to demonstrate the surgical findings or illustrate the actions. Specialist surgeons were more likely to describe the actions accurately, but less likely to describe wound closure methods or dressings used. They were also less likely to complete adequate postoperative orders. This study identifies key areas of weakness in our operative note-keeping. Pro formas should be introduced and made available for commonly performed procedures, and diagrams should be used wherever possible.

  9. Enhanced teaching and student learning through a simulator-based course in chemical unit operations design

    Science.gov (United States)

    Ghasem, Nayef

    2016-07-01

    This paper illustrates a teaching technique used in computer applications in chemical engineering employed for designing various unit operation processes, where the students learn about unit operations by designing them. The aim of the course is not to teach design, but rather to teach the fundamentals and the function of unit operation processes through simulators. A case study presenting the teaching method was evaluated using student surveys and faculty assessments, which were designed to measure the quality and effectiveness of the teaching method. The results of the questionnaire conclusively demonstrate that this method is an extremely efficient way of teaching a simulator-based course. In addition to that, this teaching method can easily be generalised and used in other courses. A student's final mark is determined by a combination of in-class assessments conducted based on cooperative and peer learning, progress tests and a final exam. Results revealed that peer learning can improve the overall quality of student learning and enhance student understanding.

  10. Emergency operating instruction improvements at San Onofre Nuclear Generating Station Units 2 and 3

    International Nuclear Information System (INIS)

    Trillo, M.W.; Smith, B.H.

    1989-01-01

    In late 1987, San Onofre nuclear generating station (SONGS) began an extensive upgrade of the units 2 and 3 emergency operating instructions (EOIs). The original intent of this program was to incorporate revised generic guidance and to correct problems that were identified by operators. While this program was in progress, the US Nuclear Regulatory Commission (NRC) conducted a series of audits of emergency operating procedure (EOP) development and maintenance programs as 16 commercial nuclear facilities in the United States. These audits included four stations with Combustion Engineering-designed nuclear steam supply systems. (One of these audits included a review of preupgrade SONGS units 2 and 3 EOIs.) Significant industrywide comments resulted from these audits. The NRC has stated its intent to continue the review and audit of EOIs and the associated maintenance programs at all US commercial nuclear facilities. The units 2 and 3 EOI upgrade program developed procedural improvements and procedural program maintenance improvements that address many of the existing audit comments that have been received by the industry. Other resulting improvements may be useful in minimizing NRC comments in future such audits. Specific improvements are discussed. The upgrade program resulted in benefits that were not originally anticipated. The results of this program can be of significant use by other utilities in addressing the industrywide concerns that have been raised in recent NRC audits of EOP development and maintenance programs

  11. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.

    1982-02-01

    This NRC Plan, which defines NRC's functional role in cleanup operations at Three Mile Island Unit 2 and outlines NRC's regulatory responsibilities in fulfilling this role, is the first revision to the initial plan issued in July 1980 (NUREG-0698). Since 1980, a number of policy developments have occurred which will have an impact on the course of cleanup operations. This revision reflects these developments in the area of NRC's review and approval process with regard to cleanup operations as well as NRC's interface with the Department of Energy's involvement in the cleanup and waste disposal. This revision is also intended to update the cleanup schedule by presenting the cleanup progress that has taken place and NRC's role in ongoing and future cleanup activities

  12. Losses of Ammonia and Nitrate from Agriculture and Their Effect on Nitrogen Recovery in the European Union and the United States between 1900 and 2050.

    Science.gov (United States)

    van Grinsven, Hans J M; Bouwman, Lex; Cassman, Kenneth G; van Es, Harold M; McCrackin, Michelle L; Beusen, Arthur H W

    2015-03-01

    Historical trends and levels of nitrogen (N) budgets and emissions to air and water in the European Union and the United States are markedly different. Agro-environmental policy approaches also differ, with emphasis on voluntary or incentive-based schemes in the United States versus a more regulatory approach in the European Union. This paper explores the implications of these differences for attaining long-term policy targets for air and water quality. Nutrient surplus problems were more severe in the European Union than in the United States during the 1970s and 1980s. The EU Nitrates and National Emission Ceilings directives contributed to decreases in fertilizer use, N surplus, and ammonia (NH) emissions, whereas in the United States they stabilized, although NH emissions are still increasing. These differences were analyzed using statistical data for 1900-2005 and the global IMAGE model. IMAGE could reproduce NH emissions and soil N surpluses at different scales (European Union and United States, country and state) and N loads in the Rhine and Mississippi. The regulation-driven changes during the past 25 yr in the European Union have reduced public concerns and have brought agricultural N loads to the aquatic environment closer to US levels. Despite differences in agro-environmental policies and agricultural structure (more N-fixing soybean and more spatially separated feed and livestock production in the United States than in the European Union), current N use efficiency in US and EU crop production is similar. IMAGE projections for the IAASTD-baseline scenario indicate that N loading to the environment in 2050 will be similar to current levels. In the United States, environmental N loads will remain substantially smaller than in the European Union, whereas agricultural production in 2050 in the United States will increase by 30% relative to 2005, as compared with an increase of 8% in the European Union. However, in the United States, even rigorous mitigation

  13. Article separation apparatus and method for unit operations

    Science.gov (United States)

    Pardini, Allan F.; Gervais, Kevin L.; Mathews, Royce A.; Hockey, Ronald L.

    2010-06-22

    An apparatus and method are disclosed for separating articles from a group of articles. The apparatus includes a container for containing one or more articles coupled to a suitable fluidizer for suspending articles within the container and transporting articles to an induction tube. A portal in the induction tube introduces articles singly into the induction tube. A vacuum pulls articles through the induction tube separating the articles from the group of articles in the container. The apparatus and method can be combined with one or more unit operations or modules, e.g., for inspecting articles, assessing quality of articles, or ascertaining material properties and/or parameters of articles, including layers thereof.

  14. 32 CFR 644.425 - Authority and procedure for disposal of surplus property by DA to eligible public agencies.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Authority and procedure for disposal of surplus property by DA to eligible public agencies. 644.425 Section 644.425 National Defense Department of Defense... property by DA to eligible public agencies. FPMR 101-47.303-2 provides that the disposal agency shall allow...

  15. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit

  16. The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research Into Operations for America's Space Program

    Science.gov (United States)

    Madura, John T.; Bauman, William H., III; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.

    2011-01-01

    The Applied Meteorology Unit (AMU) provides technology development and transition services to improve operational weather support to America's space program . The AMU was founded in 1991 and operates under a triagency Memorandum of Understanding (MOU) between the National Aeronautics and Space Administration (NASA), the United States Air Force (USAF) and the National Weather Service (NWS) (Ernst and Merceret, 1995). It is colocated with the 45th Weather Squadron (45WS) at Cape Canaveral Air Force Station (CCAFS) and funded by the Space Shuttle Program . Its primary customers are the 45WS, the Spaceflight Meteorology Group (SMG) operated for NASA by the NWS at the Johnson Space Center (JSC) in Houston, TX, and the NWS forecast office in Melbourne, FL (MLB). The gap between research and operations is well known. All too frequently, the process of transitioning research to operations fails for various reasons. The mission of the AMU is in essence to bridge this gap for America's space program.

  17. Day-Ahead Coordination of Vehicle-to-Grid Operation and Wind Power in Security Constraints Unit Commitment (SCUC

    Directory of Open Access Journals (Sweden)

    Mohammad Javad Abdollahi

    2015-08-01

    Full Text Available In this paper security constraints unit commitment (SCUC in the presence of wind power resources and electrical vehicles to grid is presented. SCUC operation prepare an optimal time table for generation unit commitment in order to maximize security, minimize operation cost and satisfy the constraints of networks and units in a period of time, as one of the most important research interest in power systems. Today, the relationship between power network and energy storage systems is interested for many researchers and network operators. Using Electrical Vehicles (PEVs and wind power for energy production is one of the newest proposed methods for replacing fossil fuels.One of the effective strategies for analyzing of the effects of Vehicle 2 Grid (V2G and wind power in optimal operation of generation is running of SCUC for power systems that are equipped with V2G and wind power resources. In this paper, game theory method is employed for deterministic solution of day-ahead unit commitment with considering security constraints in the simultaneous presence of V2G and wind power units. This problem for two scenarios of grid-controlled mode and consumer-controlled mode in three different days with light, medium and heavy load profiles is analyzed. Simulation results show the effectiveness of the presence of V2G and wind power for decreasing of generation cost and improving operation indices of power systems.

  18. Limited field investigation report for the 100-NR-1 Operable Unit

    International Nuclear Information System (INIS)

    1995-03-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-NR-1 Source Operable Unit LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land-use scenarios. This report is unique in that it is based on Hanford-specific agreements discussed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992), the Hanford Site Risk Assessment Methodology (DOE-RL 1994a), the Remedial Investigation Feasibility Study Work Plan for the 100-NR-1 Operable Unit (DOE-RL 1992a), and the Hanford Past-Practice Strategy (HPPS) (DOE-RL 1991), and must be viewed in this context. The HPPS emphasizes initiating and completing waste site cleanup through interim actions. The strategy includes paths for interim decision-making and a final remedy-selection process for the operable unit. A LFI report is required, in accordance with the HPPS, when waste sites are to be considered for IRM and existing data are insufficient to formulate a conceptual model or perform a QRA. The purpose of the report is to identify those sites that are recommended to remain as candidates for IRM, provide a preliminary summary of site characterization studies, refine the conceptual model as needed, identify potential contaminant- and location-specific applicable or relevant and appropriate requirements (ARAR), and provide a qualitative assessment of the risks associated with the sites. This assessment includes consideration of whether contaminant concentrations pose a risk to human health or the environment that warrants action through IRM

  19. Hanford Site Waste Managements Units reports

    International Nuclear Information System (INIS)

    1992-01-01

    The Hanford Site Waste Management Units Report (HSWMUR) was originated to provide information responsive to Section 3004(u) of the Hazardous and Solid Waste Amendments (HSWA) of the 1984 United States Code (USC 1984). This report provides a comprehensive inventory of all types of waste management units at the Hanford Site, including a description of the units and the waste they contain. Waste management units in this report include: (1) Resource Conservation and Recovery Act of 1976 (RCRA) disposal units, (2) Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) disposal units, (3) unplanned releases, (4) inactive contaminated structures, (5) RCRA treatment, storage, and disposal (TSD) units, and (6) other storage areas. Because of the comprehensive nature of this report, the listing of sites is more extensive than required by Section 3004(u) of HSWA. The information in this report is extracted from the Waste Information Data System (WIDS). The WIDS provides additional information concerning the waste management units contained in this report and is maintained current with changes to these units. This report is updated annually if determined necessary per the Hanford Federal Facility Agreement and Consent Order Order (commonly referred to as the Tri-Party Agreement, Ecology et al. 1990). This report identifies 1,414 waste management units. Of these, 1,015 units are identified as solid waste management units (SWMU), and 342 are RCRA treatment, storage, and disposal units. The remaining 399 are comprised mainly of one-time spills to the environment, sanitary waste disposal facilities (i.e., septic tanks), and surplus facilities awaiting decontamination and decommissioning

  20. A Moveable Feast--A Progressive Approach to the Unit Operations Laboratory

    Science.gov (United States)

    Conner, Wm. Curtis, Jr.; Hammond, Karl D.; Laurence, Robert L.

    2011-01-01

    The authors describe an alternative format for the senior laboratory in which students are allowed--indeed, expected--to communicate with previous groups and build on their results. The effect is a unit operations laboratory in which students are empowered to propose the experiments they wish to do and in which the cumulative experience of the…

  1. Use of Special Operations Forces in United Nations Missions: a Method to Resolve Complexity

    Science.gov (United States)

    2015-05-21

    physical stamina and psychological stability, followed by a rigorous training program are the imperatives to create SOF soldiers.42 Mark Bowden in...recommendation is that the United Nations should establish a Special Operations planning cell within the UN Department of Peacekeeping Operations. As of...now, the cell is nonexistent. This cell should be able to facilitate the integration of SOF into the overall peace operations concept. Finally, the

  2. Site Selection for Surplus Plutonium Disposition Facilities at the Savannah River Site

    International Nuclear Information System (INIS)

    Wike, L.D.

    2000-01-01

    A site selection study was conducted to evaluate locations for the proposed Surplus Plutonium Disposition Facilities. Facilities to be located include the Mixed Oxide (MOX) Fuel Fabrication Facility, the Pit Disassembly and Conversion Facility (PDCF), and the Plutonium Immobilization Project (PIP) facility. Objectives of the study include: (1) Confirm that the Department of Energy (DOE) selected locations for the MOX and PDCF were suitable based on selected siting criteria, (2) Recommend a site in the vicinity of F Area that is suitable for the PIP, and (3) Identify alternative suitable sites for one or more of these facilities in the event that further geotechnical characterization or other considerations result in disqualification of a currently proposed site

  3. Qualitative risk assessment for the 100-FR-1 source operable unit

    International Nuclear Information System (INIS)

    Corporation, I.T.

    1994-08-01

    This report provides the Qualitative risk assessment (QRA) for the waste sites associated with the 100-FR-1 Operable Unit. The QRA is an evaluation of risk for a predefined set of human and ecological exposure scenarios. It is not intended to replace or be a substitute for a baseline risk assessment. The QRA is streamlined to consider only two human health scenarios (frequent-and occasional-use) with four exposure pathways (soil ingestion, fugitive dust inhalation, inhalation of volatile organics, and external radiation exposure) and a limited ecological evaluation. The use of these scenarios and pathways was agreed to by the 100 Area Tri-Party unit managers

  4. Engineering evaluation/conceptual plan for the 200-UP-1 groundwater operable unit interim remedial measure

    International Nuclear Information System (INIS)

    Myers, D.A.; Swanson, L.C.; Weeks, R.S.; Giacinto, J.; Gustafson, F.W.; Ford, B.H.; Wittreich, C.; Parnell, S.; Green, J.

    1995-04-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (ERM) to address a uranium and technetium-99 groundwater plume and an associated nitrate contamination plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need and potentially achievable objectives and goals for an IRM and evaluates alternatives to contain elevated concentrations of uranium, technetium-99, nitrate, and carbon tetrachloride and to obtain information necessary to develop final remedial actions for the operable unit

  5. Cost and Operational Effectiveness Analysis of Aiternative Force Structures for Fulfillment of the United States Marine Corps Operational Support Airlift and Search and Rescue Missions

    National Research Council Canada - National Science Library

    Chase, Eric

    2000-01-01

    This thesis provides a preliminary cost and operational effectiveness analysis of alternative force structures for the United States Marine Corps operational support airlift and search and rescue missions...

  6. Utilization of surplus electricity from wind power for dynamic biogas upgrading

    DEFF Research Database (Denmark)

    Jurgensen, Lars; Ehimen, Ehiazesebhor Augustine; Born, Jens

    2014-01-01

    The methanation of CO2 has been increasingly discussed for the potential long term storage of electricity and for facilitating grid load management. Using the regions of northern Germany as a case study, the feasibility of CO2 conversion from biogas plants and its integration in existing natural...... gas grid was examined in this study. Furthermore the material and energy flows of in the methanation process, were evaluated to provide expression for the quantities of excess electrical energy which could be potentially stored using the biogas integrated systems. The study results showed...... that with 480 biogas plants in the region would be able to utilize up to 0.7 TWh surplus electricity could be used to produce 100 106 m3 at standard temperature and pressure of upgraded methane per year....

  7. Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Annual Status Report for Fiscal Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2007-05-09

    This report provides a status of the progress made in Fiscal Year 2006 on tasks identified in the Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Work Plan. Major accomplishments include: (1) groundwater sampling and review of the groundwater monitoring data, (2) installation of a Sitewide groundwater-level monitoring network, (3) update of the Groundwater Monitoring and Field Sampling Plan of Operable Unit 10-08, (4) re-evaluation of the risk at Site TSF-08, (5) progress on the Operable Unit 10-08 Sitewide Groundwater Model.

  8. Geophysical Investigation of the 618-10 and 618-11 Burial Grounds, 300-FF-2 Operable Unit

    International Nuclear Information System (INIS)

    Bergstrom, K.A.; Bolin, D.J.; Mitchell, T.H.

    1997-09-01

    This document summarizes the results of geophysical investigations conducted at two radioactive solid waste burial grounds, 618-10 and 618-11. The burial grounds are located approximately 4.5 miles and 7 miles north of the 300 Area, respectively. These sites are within the 300-FF-2 Operable Unit, where geophysical techniques are being used to characterize the distribution of solid waste in the subsurface as part of the Limited Field Investigations for this operable unit

  9. Compex system for teaching and training operators for TPP and NPP power units

    International Nuclear Information System (INIS)

    Tsiptsyura, R.D.

    1985-01-01

    Requirements, taken as a principle for constructing the system for operator teaching and training (OTT), have been formulated on the basis of investigation of operators' work at TPP and NPP power units. Functional structure and a structural block-diagram for OTT are built. As a criterion, which determines the structure of any trainers, being a part of OTT a requirement has been chosen satisfying the correspondence beetween habits developed with the help of trainers and habits of real operators' work. Results of analysis permit to confirm that refusal or under statement of the role of any stage of operator training leads to reduction of quality of his training

  10. 5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system

    CERN Document Server

    Ferlin, G; Claudet, S; Pezzetti, M

    2015-01-01

    Since 2009, the Large Hadron Collider (LHC) is in operation at CERN. The LHC superconducting magnets distributed over eight sectors of 3.3-km long are cooled at 1.9 K in pressurized superfluid helium. The nominal operating temperature of 1.9 K is produced by eight 1.8-K refrigeration units based on centrifugal cold compressors (3 or 4 stages depending to the vendor) combined with warm volumetric screw compressors with sub-atmospheric suction. After about 5 years of continuous operation, we will present the results concerning the availability for the final user of these refrigeration units and the impact of the design choice on the recovery time after a system trip. We will also present the individual results for each rotating machinery in terms of failure origin and of Mean Time between Failure (MTBF), as well as the consolidations and upgrades applied to these refrigeration units.

  11. 5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system

    Science.gov (United States)

    Ferlin, G.; Tavian, L.; Claudet, S.; Pezzetti, M.

    2015-12-01

    Since 2009, the Large Hadron Collider (LHC) is in operation at CERN. The LHC superconducting magnets distributed over eight sectors of 3.3-km long are cooled at 1.9 K in pressurized superfluid helium. The nominal operating temperature of 1.9 K is produced by eight 1.8-K refrigeration units based on centrifugal cold compressors (3 or 4 stages depending to the vendor) combined with warm volumetric screw compressors with sub-atmospheric suction. After about 5 years of continuous operation, we will present the results concerning the availability for the final user of these refrigeration units and the impact of the design choice on the recovery time after a system trip. We will also present the individual results for each rotating machinery in terms of failure origin and of Mean Time between Failure (MTBF), as well as the consolidations and upgrades applied to these refrigeration units.

  12. Results of toxicity tests and chemical analyses conducted on sediments collected from the TNX Outfall Delta Operable Unit, July 1999

    International Nuclear Information System (INIS)

    Specht, W.L.

    2000-01-01

    In order to provide unit specific toxicity data that will be used to address critical uncertainty in the ecological risk assessment (ERA) for the TNX Outfall Delta Operable Unit (TNXOD OU), sediments were collected from eight locations in the Inner Swamp portion of the operable unit and two unit specific background locations. These samples were analyzed for total mercury, total uranium, and sediment toxicity

  13. Main problems experienced on diesel generators of French 900 MWe operating units

    Energy Technology Data Exchange (ETDEWEB)

    Dredemis, Geoffroy; Jude, Francois [Commissariat a l' Energie Atomique, centre d' Etudes Nucleaires de Fontenay-aux-Roses, Institut de Protection et Surete Nucleaire, Departement d' Analyse de Surete, B.P. No. 6, 92260 Fontenay-aux-Roses (France)

    1986-02-15

    Each unit of all the French nuclear power plant is equipped with two diesel emergency generator sets., For the totality of standards PWRs of 900 MWe, they are identical. We present in this communication the most significative failures met with diesel engines on operating units, such as rupture of fuel injection pipes, breaking of the connecting rods, and cylinder lubrication failures. All these incidents, which affected the emergency power sources of concerned units, had generic characteristics. In view of their potential consequences, it was proceeded in each case to an immediate control of the components concerned of all PWR 900 MWe diesel engines. At the same time, studies were started as to what modifications would permit to solve rapidly each one of the problems met with. (authors)

  14. Computer Drawing Method for Operating Characteristic Curve of PV Power Plant Array Unit

    Science.gov (United States)

    Tan, Jianbin

    2018-02-01

    According to the engineering design of large-scale grid-connected photovoltaic power stations and the research and development of many simulation and analysis systems, it is necessary to draw a good computer graphics of the operating characteristic curves of photovoltaic array elements and to propose a good segmentation non-linear interpolation algorithm. In the calculation method, Component performance parameters as the main design basis, the computer can get 5 PV module performances. At the same time, combined with the PV array series and parallel connection, the computer drawing of the performance curve of the PV array unit can be realized. At the same time, the specific data onto the module of PV development software can be calculated, and the good operation of PV array unit can be improved on practical application.

  15. Annual Summary Report, February to December 1998, for the 100-HR-3 and 100-KR-4 Pump-and-Treat Operations and Operable Units

    International Nuclear Information System (INIS)

    Boutin, R. J.

    1999-01-01

    This annual summary report discusses the interim remedial actions at the 100-HR-3 and 100-KR-4 Operable Units (OUs) for February 1,1998, through December 31, 1998. This is the second annual summary report that has been submitted for these OUs; the first report was released in April 1998 (DOE-RL 1998). Ongoing annual summaries and performance evaluations of each of the pump-and-treat systems are required by the Remedial Design Report and Remedial Action Work Plan for the 100-HR-3 and 100-KR-4 Groundwater Operable Units' Interim Action (RDR/RAWP) (DOE-RL 1996)

  16. [Soil Olsen-P content changing trend and its relationship with phosphorus surplus and crop yield under long-term fertilization in loessial soil region on the Loess Plateau, China].

    Science.gov (United States)

    E, Sheng Zhe; Yang, Zhi Qi; Zeng, Xi Bai; Wang, Ya Nan; Luo, Zhao Xia; Yuan, Jin Hua; Che, Zong Xian

    2017-11-01

    The changing trend of soil available phosphorus (Olsen-P) content in soil and its relationship with soil phosphorus surplus and crop yield are fundamental when making appropriate phosphate fertilizer recommendations. In this paper, the influences of long-term fertilization on crops phosphorus uptake, soil phosphorus surplus, changing trend of soil available phosphorus content and relationships of soil available phosphorus content with soil phosphorus surplus and crop yield were investigated through 34 years (1981-2015) long-term trial in loessial soil region on the Loess Plateau. The experiment had a completely-randomized-block split-plot design in triplicate. Two main-plot treatments were no farmyard manure and farmyard manure (M), and four subplot treatments were CK (no fertilizer), N (application of chemical fertilizer N), NP (application of chemical fertilizer NP) and NPK (balanced application of chemical fertilizer NPK), respectively. The results showed that fertilization treatments and crop types significantly influenced uptake amount of phosphorus and soil phosphorus surplus. Averaged over time from 1981 to 2015, wheat mean phosphorus uptake amounts of CK, N, NP, NPK, M, MN, MNP and MNPK were 8.63, 10.64, 16.22, 16.21, 16.25, 17.83, 20.39 and 20.27 kg·hm -2 , while rape phosphorus uptakeamounts of eight treatments were 4.40, 8.38, 15.08, 15.71, 10.52, 11.23, 17.96 and 17.66 kg·hm -2 , respectively. The surplus amount of soil phosphorus significantly correlated with the amount of phosphorus applied to soil. When soil phosphorus surplus amount equal zero, wheat and rape phosphorus input amounts were 10.47 kg·hm -2 and 6.97 kg·hm -2 , respectively. Soil phosphorus surplus amount significantly influenced the changing trend of available phosphorus content in soil. CK and N treatments had no phosphorus input, and soil available phosphorus content exhibited a declining trend, annually decreased by 0.16 mg·kg -1 and 0.15 mg·kg -1 , respectively. In contrast

  17. Smart regulation of rural electricity grids. Modern communications technology reduces the voltage fluctuations and regulates the storage of surplus electricity; Laendliches Stromnetz smart geregelt. Moderne Kommunikationstechnik reduziert Spannungsschwankungen und regelt die Speicherung ueberschuessigen Stroms

    Energy Technology Data Exchange (ETDEWEB)

    Durst, Anna

    2012-07-01

    In the ''Smart Country'' model project, researchers in Bitburg- Pruem were testing out the distribution network of the future. It is designed to respond flexibly to the increasingly decentralised generation of renewable electricity in the grid. For this purpose various operating resources were further developed: an optimised biogas plant, which controls the electricity supplied by the grid, virtually stores surplus electricity with an efficiency of 98 %. In addition, voltage regulators double the usable output capacity in the grid. The Eifel project successfully passed the field test after around one year. (orig.)

  18. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  19. Nitrogen leaching: A crop rotation perspective on the effect of N surplus, field management and use of catch crops

    DEFF Research Database (Denmark)

    De Notaris, Chiara; Rasmussen, Jim; Sørensen, Peter

    2018-01-01

    Components of the field nitrogen (N) balance (input and surplus) are often used to predict nitrate leaching from agricultural lands. However, management factors, such as use of catch crops, greatly affect the actual loss and are a key to reduce N leaching. The present study is based on the 4th cy...

  20. Changing priorities of codes and standards: An A/E's perspective for operating units and new generation

    International Nuclear Information System (INIS)

    Meyers, B.L.; Jackson, R.W.; Morowski, B.D.

    1994-01-01

    As the nuclear power industry has shifted emphasis from the construction of new plants to the reliability and maintenance of operating units, the industry's commitment to safety has been well guarded and maintained. Many other important indicators of nuclear industry performance are also positive. Unfortunately, by some projections, as many as 25 operating nuclear units could prematurely shutdown because of increasing O ampersand M and total operating costs. The immediate impact of higher generating costs on the nuclear industry is evident. However, when viewed over the longer-term, high generating costs will also affect license renewals, progress in the development of advanced light water reactor designs and prospects for a return to the building of new plants. Today's challenge is to leverage the expertise and contribution of the nuclear industry partner organizations to steadily improve the work processes and methods necessary to reduce operating costs, to achieve higher levels in the performance of operating units, and to maintain high standards of technical excellence and safety. From the experience and perspective of an A/E and partner in the nuclear industry, this paper will discuss the changing priorities of codes and standards as they relate to opportunities for the communication of lessons learned and improving the responsiveness to industry needs

  1. Survey for preparing the database for R and D of new engines. Waste power generation, solar heat system, geothermal power generation, clean energy vehicle, coal liquefaction/gasification, and combined systems; Shin energy gijutsu kaihatsu kankei data shu sakusei chosa. Haikibutsu hatsuden, taiyonetsu riyo, chinetsu hatsuden, clean energy jidosha, sekitan ekika gas ka oyobi odanteki tema

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The present developmental conditions and issues of new energies are systematically arranged for effective promotion of their diffusion. One hundred and forty six general waste power generation facilities of 558,000kW are in operation in 1995, and among them 89 facilities supplies 1,080 GWh to power companies. 50 industrial waste power facilities of 247,000kW are in operation. 20,000 solar systems and 180,000 hot water heaters are in operation in 1995. Commercial geothermal power generation facilities of 490,000kW and private ones of 36,000kW are in operation. Introduction of expensive clean energy vehicles is making very slow progress. The pilot study on bituminous coal liquefaction is in promotion mainly by NEDO. The experiment of entrained bed coal gasification in Nakoso was successfully completed, and development of a commercial plant is to be expected. Power rates of 10 power companies were reduced in 1996, and unit purchase prices of surplus power of photovoltaic and wind power generation were also revised. The new menu and unit purchase price were announced in 1996 for surplus power of waste power generation and fuel cell. 67 figs., 284 tabs.

  2. Microbial electrosynthesis: a novel strategy for flexible energy storage from electricity surplus and greenhouse gas

    DEFF Research Database (Denmark)

    Zhang, Tian

    2014-01-01

    of the fluctuating electricity generated from renewable sources and to mitigate therelease of greenhouse gases in the atmosphere. Although MES is attracting a lot of attention and hasbeen studied intensively during the last five years, advances related to the engineering and the biologyof this process are required...... for pilot plant scale and commercialization. If MES reaches its fullpotential, it will serve as a highly flexible and tunable approach for the conversion of electrical energyinto chemical energy, generating valuable products especially from surplus electricity and CO2....

  3. THE POSITION BUDGETS OF ADMINISTRATIVE AND TERRITORIAL UNITS IN GENERAL CONSOLIDATED BUDGET

    Directory of Open Access Journals (Sweden)

    CHIRCULESCU MARIA FELICIA

    2017-12-01

    Full Text Available The budget is a tool of territorial administrative units of financial and budgetary policy in which the state intervenes in the economy at the local level, having a major impact on general government.Through the decentralization processes that are increasingly debated and applied, the paper aims to highlight the importance of the territorial administrative unit budgets in the consolidated budget in Romania.Thus, the work comprises both theoretical notions concerning the presentation of the consolidated state budget and the budget of the territorial administrative units. The relevance of the work lies in the importance of general government in the regulation of macroeconomic balances by sizing or macroeconomic imbalances, with modern methods that analyze the possibilities and effects of new types of deficits or surpluses in the public sector.

  4. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353)

    International Nuclear Information System (INIS)

    1989-06-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 to NUREG-0991 was issued in December 1983. Supplements 2 and 3 were issued in October 1984. License NPF-27 for the low-power operation of Limerick Unit 1 was issued on October 26, 1984. Supplement 4 was issued in May, 1985, Supplement 5 was issued in July 1985, and Supplement 6 was issued in August 1985. These supplements addressed further issues that required resolution before Unit 1 proceeded beyond the 5-percent power level. The full-power operating license for Limerick Unit 1 (NPF-39) was issued August 8, 1985, and the unit has completed two cycles of operation. Supplement 7 was issued April 1989 to address some of the few significant design differences between Units 1 and 2, the resolution of issues that remained open when the Unit 1 full-power license was issued and an assessment of some of the issues that required resolution before issuance of an operating license for Unit 2. This supplement addresses the remaining issues that required resolution before issuance of and operating license for Unit 2

  5. Initial data report in response to the surplus plutonium disposition environmental impact statement data call for the UO2 supply. Revision 1

    International Nuclear Information System (INIS)

    White, V.S.; Cash, J.M.; Michelhaugh, R.D.

    1997-11-01

    The purpose of this document is to support the US Department of Energy (DOE) Fissile Materials Disposition Program's preparation of the draft Surplus Plutonium Disposition Environmental Impact Statement. This is one of several responses to data calls generated to provide background information on activities associated with the operation of the Mixed-Oxide (MOX) Fuel Fabrication Facility. Urania feed for the MOX Fuel Fabrication Facility may be either natural or depleted. Natural uranium typically contains 0.0057 wt% 234 U, 0.711 wt% 235 U, and the majority as 238 U. The fissile isotope is 235 U, and uranium is considered depleted if the total 235 U content is less than 0.711 wt% as found in nature. The average composition of 235 U in DOE's total depleted urania inventory is 0.20 wt%. The depleted uranium assay range proposed for use in this program is 0.2500--0.2509 wt%. Approximately 30% more natural uranium would be required than depleted uranium based on the importance of maintaining a specific fissile portion in the MOX fuel blend. If the uranium component constitutes a larger quantity of fissile material, less plutonium can be dispositioned on an annual basis. The percentage composition, referred to as assay, of low-enriched uranium necessary for controlled fission in commercial light-water nuclear power reactors is 1.8--5.0 wt% 235 U. This data report provides information on the schedule, acquisition, impacts, and conversion process for using uranium, derived from depleted uranium hexafluoride (UF 6 ), as the diluent for the weapons-grade plutonium declared as surplus. The case analyzed is use of depleted UF 6 in storage at the Portsmouth Gaseous Diffusion Plant in Piketon, Ohio, being transported to a representative UF 6 to uranium dioxide conversion facility (GE Nuclear Energy) for processing, and subsequently transported to the MOX Fuel Fabrication Facility

  6. Operational benchmark for VVER-1000, unit 6, Kozloduy NPP

    International Nuclear Information System (INIS)

    Apostolov, T.; Petrov, B.

    1999-01-01

    Benchmark calculations have been carried out using the 3D nodal code TRAPEZ. Global neutron-physics characteristics of the VVER-1000 core, Kozloduy NPP Unit 6, have been determined taking into account the real loading patterns and operational history of the first three cycles. The code TRLOAD has been used to perform the fuel reloading between any two cycles. The reactor and components descriptions as well as material compositions are given. The results presented include the critical boric acid concentration, the radial power distribution, the axial power distribution for the maximum overload assembly, and the burnup distribution at three different moments during each cycle. Calculated values have been compared with measured data. It is shown that the results obtained by the TRAPEZ code are in good agreement with the experimental data. The information presented could serve as a test case for validation of code packages designed for analyzing the steady-state operation of VVERs. (author)

  7. 200-BP-11 operable unit and 216-B-3 main pond work/closure plan, Hanford Site, Richland, Washington. Volume 1: Field investigation and sampling strategy

    International Nuclear Information System (INIS)

    1994-09-01

    This document coordinates a Resource Conservation and Recovery Act (RCRA) past-practice work plan for the 200-BP-11 Operable Unit and a RCRA closure/postclosure plan for the 216-B-3 Main Pond and 216-B-3-3 Ditch [treatment, storage, and/or disposal (TSD) unit]. Both RCRA TSD and past-practice waste management units are contained within the 200-BP-11 Operable Unit. The 200-BP-11 Operable Unit is a source operable unit located on the east side of the B Plant Source Aggregate Area in the 200 East Area of the Hanford Site. The operable unit lies just east of the 200 East Area perimeter fence and encompass approximately 476 hectares (1,175 acres). Source operable units include waste management units that are potential sources of radioactive and/or hazardous substance contamination. Source waste management units are categorized in the Hanford Federal Facility Agreement and Consent Order as either RCRA TSD, RCRA past-practice, or Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) past-practice. As listed below and in the Tri-Party Agreement, the 200-BP-11 Operable Unit contains five RCRA past-practice and five RCRA TSD waste management units. Additionally, for RCRA TSD permitting purposes, the RCRA TSD waste management units are subdivided into two RCRA TSD units

  8. Approach and plan for cleanup actions in the 100-FR-2 operable unit of the Hanford Site, Revision 0

    International Nuclear Information System (INIS)

    1995-06-01

    A new administrative approach is being used to reach a cleanup decision for the 100-FR-2 Operable Unit. The unit, located at the 100-F Area, contains solid waste sites and is one of the remaining operable units scheduled for characterization and cleanup in the 100 Area. This Focus Package (1) describes the new approach and activities needed to reach a decision on cleanup actions for the 100-FR-2 Operable Unit and (2) invites public participation into the planning process. The previous approach included the production of a Work Plan, a Limited Field Investigation Report, a Qualitative Risk Assessment, a Focused Feasibility Study, and a Proposed Plan, all culminating in an interim action Record of Decision. Information gathered to date on other operable units allows the analgous site approach to be used on the 100-FR-2 Operable Unit, and therefore, a reduction in documentation preparation. The U.S. Environmental Protection Agency, Washington State Department of Ecology, and the U.S. Department of Energy (Tri-Party Agreement) believe that the new approach will save time and funding. In the new approach, the Work Plan has been condensed into this 12 page Focus Package. The Focus Package includes a summary of 100-F Area information, a list of waste sites in the 100-FR-2 Operable Unit, a summary of proposed work, and a schedule. The new approach will also combine the Limited Field Investigation and Qualitative Risk Assessment reports into the Focused Feasibility Study. The Focused Feasibility Study will analyze methods and costs to clean up waste sites. Consolidating the documents should reduce the time to complete the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process by 16 months, compared to the previous approach

  9. Coordinating bifurcated remediation of soil and groundwater at sites containing multiple operable units

    International Nuclear Information System (INIS)

    Laney, D.F.

    1996-01-01

    On larger and/or more complex sites, remediation of soil and groundwater is sometimes bifurcated. This presents some unique advantages with respect to expedited cleanup of one medium, however, it requires skillful planning and significant forethought to ensure that initial remediation efforts do not preclude some long-term options, and/or unduly influence the subsequent selection of a technology for the other operable units and/or media. this paper examines how the decision to bifurcate should be approached, the various methods of bifurcation, the advantages and disadvantages of bifurcation, and the best methods to build flexibility into the design of initial remediation systems so as to allow for consideration of a fuller range of options for remediation of other operable units and/or media at a later time. Pollutants of concern include: metals; petroleum hydrocarbons; and chlorinated solvents

  10. Dresden Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January thru December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 953,015.5 MWH with the generator on line 7,399.37 hrs. Unit 2 generated 4,371,553.689 MWH with the generator on line 6,664.58 hrs while Unit 3 generated 4,034,251 MWH with the generator on line 7,234.86 hrs. Information is presented concerning operations, maintenance, and shutdowns

  11. Retrofitting and operation solid radwaste system Dresden Station, Units 2 and 3

    International Nuclear Information System (INIS)

    Testa, J.; Homer, J.C.

    1982-01-01

    Units 2 and 3 at Dresden Station are twin 794 MW (net) BWR units that became operational in 1970 and 1971. The waste streams are typical of BWR stations, namely, bead resin and filter sludge (powdered resins and diatomaceous earth), evaporator concentrate containing approximately 25% dissolved solids and dry active waste. The original solid radwaste system utilized cement for solidification in open top 55 gallon drums. Remote handling was provided by means of a monorail with moving platforms supporting the drums. A relatively light-weight compactor was used to compact DAW into 55 gallon drums. Difficulties were experienced with this system

  12. Ambiguity in Units and the Referents: Two Cases in Rational Number Operations

    Science.gov (United States)

    Rathouz, Margaret

    2010-01-01

    I explore the impact of ambiguous referral to the unit on understanding of decimal and fraction operations during episodes in two different mathematics courses for pre-service teachers (PSTs). In one classroom, the instructor introduces a rectangular area diagram to help the PSTs visualize decimal multiplication. A transcript from this classroom…

  13. Material constraints related to storage of future European renewable electricity surpluses with CO_2 methanation

    International Nuclear Information System (INIS)

    Meylan, Frédéric D.; Moreau, Vincent; Erkman, Suren

    2016-01-01

    The main challenges associated with a growing production of renewable electricity are intermittency and dispersion. Intermittency generates spikes in production, which need to be curtailed when exceeding consumption. Dispersion means electricity has to be transported over long distances between production and consumption sites. In the Directive 2009/28/EC, the European Commission recommends sustainable and effective measures to prevent curtailments and facilitate transportation of renewable electricity. This article explores the material constraints of storing and transporting surplus renewable electricity by conversion into synthetic methane. Europe is considered for its mix of energy technologies, data availability and multiple energy pathways to 2050. Results show that the requirements for key materials and land remain relatively low, respecting the recommendations of the EU Commission. By 2050, more than 6 million tons of carbon dioxide might be transformed into methane annually within the EU. The efficiency of renewable power methane production is also compared to the natural process of converting solar into chemical energy (i.e. photosynthesis), both capturing and reenergizing carbon dioxide. Overall, the production of renewable methane (including carbon dioxide capture) is more efficient and less material intensive than the production of biofuels derived from photosynthesis and biomass conversion. - Highlights: •The potential of methanation to store renewable electricity surpluses is assessed. •Material constraints are relatively low. •Biogenic CO_2 will probably be insufficient. •Production of renewable power methane is more efficient than conventional biofuels. •Renewable power methane can help decarbonizing the global energy sector.

  14. UK surplus source disposal programme - 16097

    International Nuclear Information System (INIS)

    John, Gordon H.; Reeves, Nigel; Nisbet, Amy C.; Garnett, Andrew; Williams, Clive R.

    2009-01-01

    The UK Surplus Source Disposal Programme (SSDP), managed by the Environment Agency, was designed to remove redundant radioactive sources from the public domain. The UK Government Department for Environment, Food and Rural Affairs (Defra) was concerned that disused sources were being retained by hospitals, universities and businesses, posing a risk to public health and the environment. AMEC provided a range of technical and administrative services to support the SSDP. A questionnaire was issued to registered source holders and the submitted returns compiled to assess the scale of the project. A member of AMEC staff was seconded to the Environment Agency to provide technical support and liaise directly with source holders during funding applications, which would cover disposal costs. Funding for disposal of different sources was partially based on a sliding scale of risk as determined by the IAEA hazard categorisation system. This funding was also sector dependent. The SSDP was subsequently expanded to include the disposal of luminised aircraft instruments from aviation museums across the UK. These museums often hold significant radiological inventories, with many items being unused and in a poor state of repair. These instruments were fully characterised on site by assessing surface dose rate, dimensions, source integrity and potential contamination issues. Calculations using the Microshield computer code allowed gamma radiation measurements to be converted into total activity estimates for each source. More than 11,000 sources were disposed of under the programme from across the medical, industrial, museum and academic sectors. The total activity disposed of was more than 8.5 E+14 Bq, and the project was delivered under budget. (authors)

  15. Description of work for 100-DR-2 Operable Unit Vadose Drilling/test pits

    International Nuclear Information System (INIS)

    Naiknimbalkar, N.

    1993-01-01

    This report describes the scope of work for the boreholes/test pits of the 100-DR-2 Operable Unit. Sampling and field activities include: Soil screening; geologic sampling; soil sampling (physical property); analytical sampling and depths; and geophysical logging

  16. Start-up and commercial operation of the Laguna Verde power plants, unit 1

    International Nuclear Information System (INIS)

    Torres R, J.F.

    1991-01-01

    The main features of the unit 1 of the Laguna Verde Power Plant is presented as well as the phases of the start-up process. The process includes various steps and tests up to start the commercial operation. (author)

  17. Regulating power for gas boilers in houses. Surplus power from wind power plants for natural gas boilers; Regulerkraft pae villakedelomraedet. Overskuds-el fra vindmoeller til naturgaskedler

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Michael; Frederiksen, Karsten V.

    2011-08-15

    The aim of the project is to clarify the potential development of a simple electric heating unit to gas installations in houses, so that natural gas for heating can be replaced with surplus wind power. The gas network in this way becomes an energy storage for power. In this preliminary project the aim is to estimate the value of these solutions and to verify in the lab, whether it is possible to establish and activate a simple and inexpensive electric heating unit on a typical gas boiler installation. In addition, it must be clarified whether it is possible to establish a simple communication with price signal from the balancing responsible. Based on the preliminary analyses and based on the electric heating unit, which is used in this project, it is estimated that there is a potential for the use of an electric heating unit on gas boilers in houses, and there is also a market, although there are limitations in relation to space and possibly also to the price. The price is estimated to be between 1,500 and 3,000 DKK per. installation (installed). However, this should be further investigated, including that the power balancing responsible /electricity trading companies assess the social value of using the electric heating unit as an element in the regulating power market. Regarding price signal, it is clear that communication opportunities are present at least with two of the balancing responsible companies, but it requires adaptation before a simple price signal to a gas boiler installation can be established. Price wise it is considered feasible. (LN)

  18. Surpluses and Deficits: How University Partners Perceive University-Community Partnerships at One Ivy League Institution

    Directory of Open Access Journals (Sweden)

    Alison Klebanoff Cohen

    2012-07-01

    Full Text Available University-community partnerships are a critical method for how universities can serve the public interest.  Yet key questions remain: how do these partnerships work in practice, and how can university and fill reciprocal and mutual needs effectively?  A participatory evaluation of university-community partnerships in education at an Ivy League university found that university partners had a surplus perspective of the university and a deficit perspective of community partners; practitioners must shift our paradigm towards mutually beneficial, asset-driven university-community partnerships to ensure success.

  19. Categorization of safety related motor operated valve safety significance for Ulchin Unit 3

    International Nuclear Information System (INIS)

    Kang, D. I.; Kim, K. Y.

    2002-03-01

    We performed a categorization of safety related Motor Operated Valve (MOV) safety significance for Ulchin Unit 3. The safety evaluation of MOV of domestic nuclear power plants affects the generic data used for the quantification of MOV common cause failure ( CCF) events in Ulchin Units 3 PSA. Therefore, in this study, we re-estimated the MGL(Multiple Greek Letter) parameter used for the evaluation of MOV CCF probabilities in Ulchin Units 3 Probabilistic Safety Assessment (PSA) and performed a classification of the MOV safety significance. The re-estimation results of the MGL parameter show that its value is decreased by 30% compared with the current value in Ulchin Unit 3 PSA. The categorization results of MOV safety significance using the changed value of MGL parameter shows that the number of HSSCs(High Safety Significant Components) is decreased by 54.5% compared with those using the current value of it in Ulchin Units 3 PSA

  20. Water level measurements for modeling hydraulic properties in the 300-FF-5 and 100 Aggregate Area Operable units

    International Nuclear Information System (INIS)

    Campbell, M.D.; McMahon, W.J.; Simpson, K.R.

    1993-04-01

    Pressure transducers connected to dataloggers were used to measure ground water and Columbia River water elevations simultaneously and hourly at 35 locations in the 300-FF-5 Operable Unit and 16 locations in the 100 Aggregate Area Operable Unit on the Hanford Site. Water temperatures were also measured at 12 of these locations. This report details the findings of these studies

  1. 40 CFR 60.1690 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 60.1690 Section 60.1690 Protection of Environment... SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Model Rule-Good Combustion Practices: Operating Requirements § 60.1690 What...

  2. Cooling unit for a superconducting power cable. Two years successful operation

    Energy Technology Data Exchange (ETDEWEB)

    Herzog, Friedhelm [Messer Group GmbH, Krefeld (Germany); Kutz, Thomas [Messer Industriegase GmbH, Bad Soden (Germany); Stemmle, Mark [Nexans Deutschland GmbH, Hannover (Germany); Kugel, Torsten [Westnetz GmbH, Essen (Germany)

    2016-07-01

    High temperature super conductors (HTS) can efficiently be cooled with liquid nitrogen down to a temperature of 64 K (-209 C). Lower temperatures are not practical, because nitrogen becomes solid at 63 K (-210 C). To achieve this temperature level the coolant has to be vaporized below atmospheric pressure. Messer has developed a cooling unit with an adequate vacuum subcooler, a liquid nitrogen circulation system, and a storage vessel for cooling an HTS power cable. The cooling unit was delivered in 2013 for the German AmpaCity project of RWE Deutschland AG, Nexans and Karlsruhe Institute of Technology. Within this project RWE and Nexans installed the worldwide longest superconducting power cable in the city of Essen, Germany. The cable is in operation since March 10th, 2014.

  3. Nursing Leaders' Satisfaction with Information Systems in the Day-to-Day Operations Management in Hospital Units.

    Science.gov (United States)

    Peltonen, Laura-Maria; Junttila, Kristiina; Salanterä, Sanna

    2018-01-01

    Information usage in the day-to-day operations management of hospital units is complex due to numerous information systems in use. The aim of this study was to describe and compare nurse leaders' satisfaction with information systems used in the day-to-day operations management in hospital units. The design was a cross-sectional survey with five questions rated from one (disagree) to five (fully agree). The response rate was 65 % (n = 453). Respondents reported fair satisfaction with how information systems support decision-making (median 4, IQR 3-4) and improve ease of access to information (median 4, IQR 3-4). However, respondents were less satisfied with how systems improve speed of access to information (median 3, IQR 3-4). Nor did respondents think that systems were developed for them (median 3, IQR 2-4). Respondents further reported needing numerous systems daily to support decision-making (median 4, IQR 3-5). A clear need for one system, which would gather important information for display was stated (median 5, IQR 4-5). Work experience, gender and time when overseeing the unit were associated with some aspects related to satisfaction. In conclusion, information system improvements are needed to better support the day-to-day operations management in hospital units.

  4. Study of the thermal behavior of a latent heat cold storage unit operating under frosting conditions

    International Nuclear Information System (INIS)

    Simard, A.P.; Lacroix, M.

    2003-01-01

    A study is performed of the thermal behavior of a latent heat cold storage unit operating under frosting conditions. This unit is employed to maintain the temperature inside the refrigerated compartment of a truck below 265 K. The system consists of parallel plates filled with a phase change material (PCM) that absorbs heat from the flow of warm moist air. A mathematical model for the system is first presented and, next, validated with numerical and experimental data. It is then exploited to assess the effects of design parameters and operating conditions on the performance of the system. The recommended thickness and distance separating the PCM plates are found to be 50x10 -3 and 30x10 -3 m, respectively. The results indicate that the performance of the unit is enhanced by turbulent air flow in spite of the increased pressure loss and accentuated frost growth. The unit also performs well even when the surrounding relative humidity is 100%

  5. Baseline groundwater model update for p-area groundwater operable unit, NBN

    Energy Technology Data Exchange (ETDEWEB)

    Ross, J. [Savannah River Site (SRS), Aiken, SC (United States); Amidon, M. [Savannah River Site (SRS), Aiken, SC (United States)

    2015-09-01

    This report documents the development of a numerical groundwater flow and transport model of the hydrogeologic system of the P-Area Reactor Groundwater Operable Unit at the Savannah River Site (SRS) (Figure 1-1). The P-Area model provides a tool to aid in understanding the hydrologic and geochemical processes that control the development and migration of the current tritium, tetrachloroethene (PCE), and trichloroethene (TCE) plumes in this region.

  6. Extension of Operating Range in Pump-Turbines. Influence of Head and Load

    Directory of Open Access Journals (Sweden)

    Carme Valero

    2017-12-01

    Full Text Available Due to the increasing share of new renewable energies like wind and solar in the generation of electricity the need for power regulation and energy storage is becoming of paramount importance. One of the systems to store huge amounts of energy is pumped storage using reversible hydropower units. The machines used in these power plants are pump-turbines, which can operate as a pump and as a turbine. The surplus of electrical energy during low consumption hours can be converted into potential hydraulic energy by pumping water to a higher level. The stored energy can be converted into electricity again by operating the runner as a turbine. Due to new regulation requirements machines have to extend the operating range in order to match energy generation with consumption for the grid stability. In this paper the consequences of extending the operating range in existing pump-turbines have been studied. For that purpose, the data obtained after two years of condition monitoring were analyzed. Vibrations and pressure fluctuations of two pump-turbines of 85 MW each have been studied during pump and turbine operation. For turbine operation the effects of extending the operating range from the standard range of 45–85 MW to and increased range of 20–85 MW were analyzed. The change in vibration levels and signatures at very low load are presented with the identification of the phenomena that occur under these conditions. The influence of head in the vibration behavior is also presented. The appearance of fluid instabilities generated at part load that may produce power swing is also presented. Finally, the effect of head on the vibration levels for pump operation is shown and analyzed.

  7. Acetone-butanol-ethanol production from substandard and surplus dates by Egyptian native Clostridium strains.

    Science.gov (United States)

    Abd-Alla, Mohamed Hemida; Zohri, Abdel-Naser Ahmed; El-Enany, Abdel-Wahab Elsadek; Ali, Shimaa Mohamed

    2015-04-01

    One hundred and seven mesophilic isolates of Clostridium were isolated from agricultural soils cultivated with different plants in Assuit Governorate, Egypt. Eighty isolates (out of 107) showed the ability to produce ABE (Acetone, butanol and ethanol) on T6 medium ranging from 0.036 to 31.89 g/L. The highest numbers of ABE producing isolates were obtained from soil samples of potato contributing 27 isolates, followed by 18 isolates from wheat and 10 isolates from onion. On the other hand, there were three native isolates that produced ABE more than those produced by the reference isolate Clostridium acetobutylicum ATCC 824 (11.543 g/L). The three isolates were identified based on phenotypic and gene encoding 16S rRNA as Clostridium beijerinckii ASU10 (KF372577), Clostridium chauvoei ASU55 (KF372580) and Clostridium roseum ASU58 (KF372581). The highest ABE level from substandard and surplus dates was produced by C. beijerinckii ASU10 (24.07 g/L) comprising butanol 67.15% (16.16 g/L), acetone 30.73% (7.4 g/L) and ethanol 2.12% (0.51 g/L), while C. roseum ASU58 and C. chauvoei ASU55 produced ABE contributing 20.20 and 13.79 g/L, respectively. ABE production by C. acetobutylicum ATCC 824 was 15.01 g/L. This study proved that the native strains C. beijerinckii ASU10 and C. roseum ASU58 have high competitive efficacy on ABE production from economical substrate as substandard and surplus date fruits. Additionally, using this substrate without any nutritional components is considered to be a commercial substrate for desired ABE production. Copyright © 2014 Elsevier Ltd. All rights reserved.

  8. Female Participation in Formed Police Units: A Report on the Integration of Women in Formed Police Units of Peacekeeping Operations

    Science.gov (United States)

    2012-09-01

    of Peacekeeping Operations in accor- dance with the principles of United Nations (UN) Res- olution 1325. To address this topic the study (1) briefly...that the eligibility criteria was revised to include women who played support roles to the combatants, as cooks, por- ters, sex slaves or spies

  9. Qualitative risk assessment for the 100-NR-2 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    This qualitative risk assessment provides information about the 100- NR-2 Groundwater Operable Unit of the Hanford reservation. Topics discussed in this report are: data evaluation; human health risk assessment overview; ecological evaluations; summary of uncertainty; results of both the ecological and human health evaluations; toxicity assessment; risk characterization; and a summary of contaminants of potential concern

  10. Surry Power Station, Units 1 and 2. Semiannual operating report, July--December 1974

    International Nuclear Information System (INIS)

    1974-01-01

    Net electric power generated by Surry Unit 1 was 6,930,353 MWH with the generator on line for 10,417.7 hours. Net electric power generated by Unit 2 was 5,699,299 MWH with the generator on line for 8,384.2 hours. Information is presented concerning operation, radioactive effluent releases, solid radioactive wastes, fuel shipments, occurrences in which temperature limitations on the condenser cooling water discharge were exceeded, changes in station organization, occupational personnel radiation exposure, nonradiological monitoring including thermal, physical, and biological programs, and the radiological environmental monitoring program. (U.S.)

  11. Turkey Point Plant, Units 3 and 4. Semiannual operating report No. 7, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Unit 3 generated 1,968,074 MWh(e) net electric power and the generator was on line 2,802.9 hrs. Unit 4 generated 2,560,476 MWh(e) and was on line 3,944.8 hrs. Information is presented concerning operations, power generation, shutdowns, maintenance, changes, tests, experiments, radioactive effluent releases, radiological environmental monitoring, and occupational personnel radiation monitoring

  12. Scale-up of a mixer-settler extractor using a unit operations approach

    International Nuclear Information System (INIS)

    Lindholm, D.C.; Bautista, R.G.

    1976-01-01

    The results of scale-up studies on a continuous, multistage horizontal mixer-settler extractor are presented. The chemical and mechanical system involves the separation of lanthanum from a mixture of rare earth chlorides using di(2-ethylhexyl) phosphoric acid as the solvent and dilute HCl as a scrub solution in a bench scale extractor. Each stage has a hold-up of 2.6 l. A single stage unit is utilized for scale-up studies. Results are obtained on four sizes of geometrically similar units, the largest being six times the volume of the original bench size. A unit operations technique is chosen so that mixing and settling can be examined independently. Variables examined include type of continuous phase, flow rate of inlet streams, and power input to the mixer. Inlet flow-rate ratios are kept constant for all tests. Two potential methods of unbaffled pump-mixer scale-up are explored; the maintenance of constant impeller tip speed and constant power input. For the settler, the previously successful method of basing design on constant flow-rate per unit cross-sectional area is used

  13. A Bankruptcy Problem Approach to Load-shedding in Multiagent-based Microgrid Operation

    OpenAIRE

    Kim, Hak-Man; Kinoshita, Tetsuo; Lim, Yujin; Kim, Tai-Hoon

    2010-01-01

    A microgrid is composed of distributed power generation systems (DGs), distributed energy storage devices (DSs), and loads. To maintain a specific frequency in the islanded mode as an important requirement,  the control of DGs’ output and charge action of DSs are used in supply surplus conditions and load-shedding and discharge action of DSs are used in supply shortage conditions. Recently, multiagent systems for autonomous microgrid operation have been studied. Especially, load-shedding, whi...

  14. 78 FR 25066 - Girard Gurgick; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or...

    Science.gov (United States)

    2013-04-29

    ... Water Treatment Plant operated by the City of Fairfax; and (4) appurtenant facilities. The power generated will be used by the City of Fairfax to drive the water pumps at their water treatment plant. The... United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable...

  15. Ending the U.S. War in Iraq: The Final Transition, Operational Maneuver, and Disestablishment of United States Forces-Iraq

    Science.gov (United States)

    2013-01-01

    astonishing, beautiful scene— impossible, incomprehensible, only months ago.”202 In April 2008, MNF-I and the government of Iraq signed a memorandum... bloggers , August 3, 2011. 43 See the memorandum from JLOC in Appendix F. For more information, see National Association of State Agencies for Surplus...Reposturing and the Status of Government-Owned Equipment in Iraq,” roundtable with defense bloggers , August 3, 2011. As of August 6, 2012: http

  16. Dresden Nuclear Power Station, Units 1, 2, and 3. Semiannual report on operating and maintenance, July--December 1974

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 388,882 MWH(e) and was on line 3111.2 hours, Unit 2 generated 1,204,106 MWH(e) and was on line 2013.4 hours, and Unit 3 generated 2,250,810 MWH(e) and was on line 3836 hours. Information is presented concerning operations, shutdowns, maintenance, changes, tests, and experiments for the three units. (U.S.)

  17. Operation of the radioactive acid digestion test unit

    International Nuclear Information System (INIS)

    Blasewitz, A.G.; Allen, C.R.; Lerch, R.E.; Ely, P.C.; Richardson, G.L.

    1980-01-01

    The Radioactive Acid Digestion Test Unit (RADTU) has been constructed at Hanford to demonstrate the application of the Acid Digestion Process for treating combustible transuranic wastes and scrap materials. The RADTU with its original tray digestion vessel has recently completed a six-month campaign processing potentially contaminated nonglovebox wastes from a Hanford plutonium facility. During this campaign, it processed 2100 kg of largely cellulosic wastes at an average sustained processing rate of 3 kg/h as limited by the water boiloff rate from the acid feeds. The on-line operating efficiency was nearly 50% on a twelve hour/day, five day/week basis. Following this campaign, a new annular high rate digester has been installed for testing. In preliminary tests with simulated wastes, the new digester demonstrated a sustained capacity of 10 kg/h with greatly improved intimacy of contact between the digestion acid and the waste. The new design also doubles the heat transfer surface, which with reduced heat loss area, is expected to provide at least three times the water boiloff rate of the previous tray digester design. Following shakedown testing with simulated and low-level wastes, the new unit will be used to process combustible plutonium scrap and waste from Hanford plutonium facilities for the purposes of volume reduction, plutonium recovery, and stabilization of the final waste form

  18. Engineering evaluation/conceptual plan for the 200-UP-1 Groundwater Operable Unit interim remedial measure. Revision 2

    International Nuclear Information System (INIS)

    1996-03-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (IRM) to address a uranium and technetium-99 groundwater plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need for an IRM and its potentially achievable objectives and goals. The report also evaluates alternatives to contain elevated concentrations of uranium and technetium-99 and to obtain information necessary to develop final remedial actions for the operable unit

  19. Hydrologic resources management program and underground test area operable unit fy 1997

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D. F., LLNL

    1998-05-01

    This report present the results of FY 1997 technical studies conducted by the Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area Operable Unit (UGTA). The HRMP is sponsored by the US Department of Energy to assess the environmental (radiochemical and hydrologic) consequences of underground nuclear weapons testing at the Nevada Test Site.

  20. Development of a processor embedded timing unit for the synchronized operation in KSTAR

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Woongryol, E-mail: wrlee@nfri.re.kr; Lee, Taegu; Hong, Jaesic

    2016-11-15

    Highlights: • Timing board for the synchronized tokamak operation. • Processor embedded distributed control system. • Single clock source and multiple trigger signal for the plasma diagnostics. • Delay compensation among the distributed timing boards. - Abstract: The Local Timing Unit (LTU) in KSTAR provides a single clock source and multiple trigger signals with flexible configuration. Over the past seven years, the LTU had a mechanical redesign and several firmware updates for the purpose of provision of a robust operation and precision timing signal. Now we have developed a third version of a local timing unit which has a standalone operation capability. The LTU is built in a cabinet mountable 1U PIZZA box and provides twelve signal output ports, a packet mirroring interface, and an LCD interface panel. The core functions of the LTU are implemented in a Field Programmable Gate Array (FPGA) which has an internal hardcore processor. The internal processor allows the use of Linux Operating System (OS) and the Experimental Physics and Industrial Control System (EPICS). All user level application functions are controllable through the EPICS, however the time critical internal functions are performed by the FPGA logic blocks same as the previous version. The new LTU provides pluggable output module so that we can easily extend the signal output port. The easy installation and effective replacement reduce the efforts of maintenance. This paper describes design, development, and commissioning results of the new KSTAR LTU.

  1. Development of a processor embedded timing unit for the synchronized operation in KSTAR

    International Nuclear Information System (INIS)

    Lee, Woongryol; Lee, Taegu; Hong, Jaesic

    2016-01-01

    Highlights: • Timing board for the synchronized tokamak operation. • Processor embedded distributed control system. • Single clock source and multiple trigger signal for the plasma diagnostics. • Delay compensation among the distributed timing boards. - Abstract: The Local Timing Unit (LTU) in KSTAR provides a single clock source and multiple trigger signals with flexible configuration. Over the past seven years, the LTU had a mechanical redesign and several firmware updates for the purpose of provision of a robust operation and precision timing signal. Now we have developed a third version of a local timing unit which has a standalone operation capability. The LTU is built in a cabinet mountable 1U PIZZA box and provides twelve signal output ports, a packet mirroring interface, and an LCD interface panel. The core functions of the LTU are implemented in a Field Programmable Gate Array (FPGA) which has an internal hardcore processor. The internal processor allows the use of Linux Operating System (OS) and the Experimental Physics and Industrial Control System (EPICS). All user level application functions are controllable through the EPICS, however the time critical internal functions are performed by the FPGA logic blocks same as the previous version. The new LTU provides pluggable output module so that we can easily extend the signal output port. The easy installation and effective replacement reduce the efforts of maintenance. This paper describes design, development, and commissioning results of the new KSTAR LTU.

  2. Indian Farmers’ Perceptions and Willingness to Supply Surplus Biomass to an Envisioned Biomass-Based Power Plant

    Directory of Open Access Journals (Sweden)

    Anas Zyadin

    2015-04-01

    Full Text Available The main objectives of this socio-technical study are to investigate the Indian farmers’ biomass production capacities and their perceptions and willingness to supply their surplus biomass to fuel an envisioned biomass-based power plant in three selected Indian states: Maharashtra, Madhya Pradesh and Tamil Nadu. For doing so, 471 farmers (about one-third from each state have been interviewed in the field with info-sheet filled in by the field investigators. The farmers from all of the states appeared very much willing to sell their surplus biomass directly to a power plant. The farmers seem to depreciate the involvement of a middleman in the biomass procurement process. The farmers, however, appeared to highly appreciate a community-based association to regulate the biomass prices, with varying perceptions regarding government intervention. The majority of the farmers perceived the establishment of a biomass-based power plant in their region with positive economic outcomes. The farmers identified several barriers to supply biomass to a power plant where transportation logistics appeared to be the main barrier. The study recommends considering biomass collection, storage and transportation logistics as a fundamental segment of any envisioned investment in a biomass-based power plant. Biomass processing, such as pelletization or briquetting is recommended for efficient transportation of biomass at longer distances to reduce the transportation costs. The study further encourages the establishment of a farmers’ association aimed at collecting and selling biomass in agriculture areas predominant for small land holdings.

  3. Feasibility study for the creation of a methanation unit in the Bretagne Romantique territory

    International Nuclear Information System (INIS)

    Djelal, H.

    2014-01-01

    The community of communes Bretagne Romantique has decided to hire a reflection for the creation of a methanization unit on its territory by valuing the surplus of biomass and thus contributing to the overall project of reducing the fossil: energy consumption. A field study was conducted by contacting, either directly or using a questionnaire, the leading actors of biomass production, such as farmers and municipalities of the territory but also neighboring towns. In order to upgrade the products derived from methanization (heat biogas, digestate), a study was conducted in parallel with industries and several municipalities. The results of the study supported the idea that a project of scale was feasible on the sector, as the increase of obligation of purchase in May 2011 and the Energy Performance Plan allow us to consider either the development of a project involving around ten houses in these Structural Surplus Zones, or the implantation of a higher-power digester. Location is still to be defined depending on the area of input production and heat recovery. (author)

  4. Selection of Forklift Unit for Warehouse Operation by Applying Multi-Criteria Analysis

    Directory of Open Access Journals (Sweden)

    Predrag Atanasković

    2013-07-01

    Full Text Available This paper presents research related to the choice of the criteria that can be used to perform an optimal selection of the forklift unit for warehouse operation. The analysis has been done with the aim of exploring the requirements and defining relevant criteria that are important when investment decision is made for forklift procurement, and based on the conducted research by applying multi-criteria analysis, to determine the appropriate parameters and their relative weights that form the input data and database for selection of the optimal handling unit. This paper presents an example of choosing the optimal forklift based on the selected criteria for the purpose of making the relevant investment decision.

  5. Conceptual site models for groundwater contamination at 100-BC-5, 100-KR-4, 100-HR-3, and 100-FR-3 operable units

    International Nuclear Information System (INIS)

    Peterson, R.E.; Raidl, R.F.; Denslow, C.W.

    1996-09-01

    This document presents technical information on groundwater contamination in the 100-BC-5, 100-KR-4, 100-HR-3, and 100-FR-3 Operable Units on the Hanford Site in Richland, Washington. These operable units are defined for groundwater that underlies the retired plutonium production reactors and their associated support facilities. This technical information supports conceptual site models (CSM) for each operable unit. The goal in maintaining a CSM is to ensure that a reasonable understanding of contamination issues in each groundwater operable unit is available for selecting a final remediation alternative and for developing a record of decision. CSMs are developed for hazardous waste sites to help evaluate potential risks to human health and the environment from exposure to contamination

  6. Donald C. Cook Nuclear Power Plant, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit was paralleled to the grid 83.1 percent of the time and 7,073,200 MWH gross was generated. There were six scheduled outages and 14 forced outages/load reductions. Information is presented concerning operations, shutdowns, power reductions, inservice maintenance, personnel radiation exposures, fuel history, and facility changes

  7. Decommissioning of eight surplus production reactors at the Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-12-01

    The first section of this volume summarizes the content of the draft environmental impact statement (DEIS) and this Addendum, which together constitute the final environmental impact statement (FEIS) prepared on the decommissioning of eight surplus plutonium production reactors at Hanford. The FEIS consists of two volumes. The first volume is the DEIS as written. The second volume (this Addendum) consists of a summary; Chapter 9, which contains comments on the DEIS and provides DOE's responses to the comments; Appendix F, which provides additional health effects information; Appendix K, which contains costs of decommissioning in 1990 dollars; Appendix L, which contains additional graphite leaching data; Appendix M, which contains a discussion of accident scenarios; Appendix N, which contains errata; and Appendix 0, which contains reproductions of the letters, transcripts, and exhibits that constitute the record for the public comment period

  8. Proposed plan for the 100-IU-1, 100-IU-3, 100-IU-4, AND 100-IU-5 Operable Units

    International Nuclear Information System (INIS)

    1995-06-01

    This proposed plan identifies the preferred alternative for the Riverland Rad Yard, the Wahluke Slope, the Sodium Dichromate Baffel Landfill, and the, White Bluffs Pickling Acid Cribs, located at the Hanford Site. These areas are known respectively as the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. Between 1992 and 1994, each of the four operable units was the subject of an expedited response action that addressed removal of site contaminants in soil. Waste sites in the 100-IU-2 (White Bluffs Townsite) and 100-IU-6 (Hanford Townsite) Operable Units will be addressed in future proposed plans. A proposed plan is intended to be a fact sheet for public review that summarizes the information relied upon to recommend the preferred alternative. As presented in this proposed plan, no further action is the preferred alternative for the final resolution of the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. The preferred alternative is recommended because all suspect hazardous substances above cleanup levels have been removed from the waste sites, and the sites are unlikely to pose any significant risk to human health or the environment

  9. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    This proposed plan introduces the interim remedial measures for addressing contaminated soil at the 100-HR-1 Operable Unit, located at the Hanford Site. In addition, this plan includes a summary of other alternatives analyzed and considered for the 100-HR-1 Operable Unit. The EPA, DOE, and Washington State Dept. of Ecology believe that a combination of removal, treatment, and disposal technologies, where appropriate, would significantly reduce the potential threats to human health and the environment at the 100-HR-1 Operable Unit high-priority waste sites. The remedial actions described in this proposed plan are designed to minimize human health and ecological risks and ensure that additional contaminants originating from these waste sites are not transported to the groundwater. The 100-HR-1 Operable Unit contains the retention basin for the H reactor cooling system, process effluent trenches, the Pluto crib which received an estimated 260 gallons of radioactive liquid waste, process effluent pipelines, and solid waste sites used for the burial of decontaminated and decommissioned equipment from other facilities. Potential health threats would be from the isotopes of cesium, cobalt, europium, plutonium, and strontium, and from chromium, arsenic, lead, and chysene

  10. Development of in situ product removal strategies in biocatalysis applying scaled-down unit operations.

    Science.gov (United States)

    Heintz, Søren; Börner, Tim; Ringborg, Rolf H; Rehn, Gustav; Grey, Carl; Nordblad, Mathias; Krühne, Ulrich; Gernaey, Krist V; Adlercreutz, Patrick; Woodley, John M

    2017-03-01

    An experimental platform based on scaled-down unit operations combined in a plug-and-play manner enables easy and highly flexible testing of advanced biocatalytic process options such as in situ product removal (ISPR) process strategies. In such a platform, it is possible to compartmentalize different process steps while operating it as a combined system, giving the possibility to test and characterize the performance of novel process concepts and biocatalysts with minimal influence of inhibitory products. Here the capabilities of performing process development by applying scaled-down unit operations are highlighted through a case study investigating the asymmetric synthesis of 1-methyl-3-phenylpropylamine (MPPA) using ω-transaminase, an enzyme in the sub-family of amino transferases (ATAs). An on-line HPLC system was applied to avoid manual sample handling and to semi-automatically characterize ω-transaminases in a scaled-down packed-bed reactor (PBR) module, showing MPPA as a strong inhibitor. To overcome the inhibition, a two-step liquid-liquid extraction (LLE) ISPR concept was tested using scaled-down unit operations combined in a plug-and-play manner. Through the tested ISPR concept, it was possible to continuously feed the main substrate benzylacetone (BA) and extract the main product MPPA throughout the reaction, thereby overcoming the challenges of low substrate solubility and product inhibition. The tested ISPR concept achieved a product concentration of 26.5 g MPPA  · L -1 , a purity up to 70% g MPPA  · g tot -1 and a recovery in the range of 80% mol · mol -1 of MPPA in 20 h, with the possibility to increase the concentration, purity, and recovery further. Biotechnol. Bioeng. 2017;114: 600-609. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  11. Data compilation task report for the source investigation of the 300-FF-1 operable unit phase 1 remedial investigation

    International Nuclear Information System (INIS)

    Young, J.S.; Fruland, R.M.; Fruchter, J.S.

    1990-02-01

    This report provides additional information on facility and waste characteristics for the 300-FF-1 operable unit. The additional information gathered and reported includes meetings and on-site visits with current and past personnel having knowledge of operations in the operable unit, a more precise determination of the location of the Process Sewer lines and Retired Radioactive Liquid Waste Sewer, a better understanding of the phosphoric acid spill at the 340 Complex, and a search for engineering plans and environmental reports related to the operable unit. As a result of this data-gathering effort, recommendations for further investigation include characterization of the 307 Trenches to determine the origin of an underlying uranium plume in the groundwater, more extensive sampling of near-surface and dike sediments in the North and South Process Ponds to better define the extent of horizontal contamination, and detection of possible leaks in the abandoned Radioactive Waste Sewer by either electromagnetic induction or remote television camera inspection techniques. 16 refs., 4 figs., 5 tabs

  12. Peach Bottom Atomic Power Station, Units 2 and 3. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 2 experienced 11 forced outages, 5 power reductions, and one major refueling outage which lasted about 3 months during which time the feedwater spargers were replaced. Net electrical power generated was 5,569,633 MWH with the generator on line 5,998 hrs. Unit 3 experienced 17 forced outages, 11 power reductions and 2 major outages. The first refueling outage began 12/24/77. Net electrical power generated was 6,049,644 MWH with the unit on line 6,829 hrs. Information is presented concerning operations, personnel exposures, radioactive releases, maintenance, and irradiated fuel examination

  13. Superfund record of decision (EPA Region 4): Marzone Inc. /Chevron Chemical Company Superfund Site, Operable Unit 1, Tifton, GA, September 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-30

    This decision document (Record of Decision) presents the selected remedial action for the Marzone, Inc./Chevron Chemical Company Site in Tift County, Georgia. EPA has organized the work at this Site into two phases or operable units (OUs). Operable Unit No. 1 involves contamination on the 1.68-acre former Marzone pesticide blending area, part of the Slack Property, and railroad drainage ditch past the southwest corner of the horse pasture, and contaminated groundwater related to the Site. This first operable unit is broken down into two separate remedies; one for groundwater and the other for soil.

  14. Pilot-scale treatability test plan for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump-and-treat testing at the 100-HR-3 Operable Unit. The test will be conducted in fulfillment of interim Milestone M-15-06E to begin pilot-scale pump-and-treat operations by August 1994. The scope of the test was determined based on the results of lab/bench-scale tests (WHC 1993a) conducted in fulfillment of Milestone M-15-06B. These milestones were established per agreement between the U.S. Department of Energy (DOE), the Washington State Department of Ecology and the U.S. Environmental Protection Agency (EPA), and documented on Hanford Federal of Ecology Facility Agreement and Consent Order Change Control Form M-15-93-02. This test plan discusses a pilot-scale pump-and-treat test for the chromium plume associated with the D Reactor portion of the 100-HR-3 Operable Unit. Data will be collected during the pilot test to assess the effectiveness, operating parameters, and resource needs of the ion exchange (IX) pump-and-treat system. The test will provide information to assess the ability to remove contaminants by extracting groundwater from wells and treating extracted groundwater using IX. Bench-scale tests were conducted previously in which chromium VI was identified as the primary contaminant of concern in the 100-D reactor plume. The DOWEX 21K trademark resin was recommended for pilot-scale testing of an IX pump-and-treat system. The bench-scale test demonstrated that the system could remove chromium VI from groundwater to concentrations less than 50 ppb. The test also identified process parameters to monitor during pilot-scale testing. Water will be re-injected into the plume using wells outside the zone of influence and upgradient of the extraction well

  15. The Vertebrate Brain, Evidence of Its Modular Organization and Operating System: Insights into the Brain's Basic Units of Structure, Function, and Operation and How They Influence Neuronal Signaling and Behavior

    Science.gov (United States)

    Baslow, Morris H.

    2011-01-01

    The human brain is a complex organ made up of neurons and several other cell types, and whose role is processing information for use in eliciting behaviors. However, the composition of its repeating cellular units for both structure and function are unresolved. Based on recent descriptions of the brain's physiological “operating system”, a function of the tri-cellular metabolism of N-acetylaspartate (NAA) and N-acetylaspartylglutamate (NAAG) for supply of energy, and on the nature of “neuronal words and languages” for intercellular communication, insights into the brain's modular structural and functional units have been gained. In this article, it is proposed that the basic structural unit in brain is defined by its physiological operating system, and that it consists of a single neuron, and one or more astrocytes, oligodendrocytes, and vascular system endothelial cells. It is also proposed that the basic functional unit in the brain is defined by how neurons communicate, and consists of two neurons and their interconnecting dendritic–synaptic–dendritic field. Since a functional unit is composed of two neurons, it requires two structural units to form a functional unit. Thus, the brain can be envisioned as being made up of the three-dimensional stacking and intertwining of myriad structural units which results not only in its gross structure, but also in producing a uniform distribution of binary functional units. Since the physiological NAA–NAAG operating system for supply of energy is repeated in every structural unit, it is positioned to control global brain function. PMID:21720525

  16. The Vertebrate Brain, Evidence of Its Modular Organization and Operating System: Insights into the Brain's Basic Units of Structure, Function, and Operation and How They Influence Neuronal Signaling and Behavior.

    Science.gov (United States)

    Baslow, Morris H

    2011-01-01

    The human brain is a complex organ made up of neurons and several other cell types, and whose role is processing information for use in eliciting behaviors. However, the composition of its repeating cellular units for both structure and function are unresolved. Based on recent descriptions of the brain's physiological "operating system", a function of the tri-cellular metabolism of N-acetylaspartate (NAA) and N-acetylaspartylglutamate (NAAG) for supply of energy, and on the nature of "neuronal words and languages" for intercellular communication, insights into the brain's modular structural and functional units have been gained. In this article, it is proposed that the basic structural unit in brain is defined by its physiological operating system, and that it consists of a single neuron, and one or more astrocytes, oligodendrocytes, and vascular system endothelial cells. It is also proposed that the basic functional unit in the brain is defined by how neurons communicate, and consists of two neurons and their interconnecting dendritic-synaptic-dendritic field. Since a functional unit is composed of two neurons, it requires two structural units to form a functional unit. Thus, the brain can be envisioned as being made up of the three-dimensional stacking and intertwining of myriad structural units which results not only in its gross structure, but also in producing a uniform distribution of binary functional units. Since the physiological NAA-NAAG operating system for supply of energy is repeated in every structural unit, it is positioned to control global brain function.

  17. Numerical Analysis of Loss of Residual Heal Removal System (RHRS) during Mid-Loop Operation for Hanul NPP Units 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sook Kwan; Park, Seong Gyu; Han, Sang Koo [ACT Co., Daejeon (Korea, Republic of)

    2016-10-15

    As a part of supporting LPSD (Low Power and Shutdown) PSA (Probabilistic Safety Assessment) of Hanul NPP units 1 and 2, numerical analysis for a loss of RHRS (Residual Heat Removal system) during midloop operation was performed using RELAP5/MOD3.3 code. The one of main purpose of thermal hydraulic analysis for PSA work is to estimate times allowable for operation actions in each accident. A loss of RHRS during mid-loop operation may cause more significant results than during RCS full condition due to reduced RCS inventory. In order to perform this kind of analysis, it is particularly important to establish a steady state of mid-loop operational initial condition. Mid-loop operation corresponds to POS(Plant Operational State) 5 and 11 in the category of LPSD PSA at Hanul NPP units 1 and 2. RELAP5/MOD3.3 code was used to predict behaviors of RCS and fuels for the case of loss of RHRS during mid-loop operation at Hanul NPP units 1 and 2. The initial state of mid-loop operational condition was established by proper control of charging and letdown flow. Considering existing similar analysis results for this kind of accident, it can be concluded that RELAP5 code well predicts reasonably the behavior of RCS for loss of RHRS during mid-loop operation in Hanul NPP units 1 and 2. Thus the method developed in the analysis can be applied reasonably to support LPSD PSA.

  18. 78 FR 32278 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to...

    Science.gov (United States)

    2013-05-29

    ... Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to Information in Tier 1, Table... Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, Municipal... Table 3.3-1, ``Definition of Wall Thicknesses for Nuclear Island Buildings, Turbine Buildings, and Annex...

  19. Field measurement of the piping system vibration of Ko-Ri unit 4 during the load-following operation

    International Nuclear Information System (INIS)

    Chung, Tae-Young; Hong, Sung-Yull; Kim, Bum-Nyun.

    1989-01-01

    During the load-following operation of nuclear power plants, flow rate, temperature, and pressure in the piping system can be varied by changing the electric power output level, and these variations can cause different vibration phenomena in the piping system. The piping system vibration is important because it is directly related to the dynamic stress of the piping system and can affect the life of the piping system through structural fatigue. An assessment of vibration levels for the classes II and III piping systems of the Ko-Ri Unit 4950-MW nuclear power plant was performed according to the given pattern of the load-following operation to study its feasibility from the viewpoint of piping system vibration. The classes II and III piping system vibration of the Ko-Ri Unit 4 may not cause any potential problem under the given pattern of the load-following operation; however, it is recommended that long-term operation in the 85 to 95% power range be avoided as much as possible

  20. 40 CFR Table 14 to Subpart Uuu of... - Continuous Compliance With Operating Limits for Organic HAP Emissions From Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Compliance With Operating Limits for Organic HAP Emissions From Catalytic Cracking Units 14 Table 14 to Subpart UUU of Part 63... Compliance With Operating Limits for Organic HAP Emissions From Catalytic Cracking Units As stated in § 63...

  1. 40 CFR Table 21 to Subpart Uuu of... - Continuous Compliance With Operating Limits for Organic HAP Emissions From Catalytic Reforming Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Compliance With Operating Limits for Organic HAP Emissions From Catalytic Reforming Units 21 Table 21 to Subpart UUU of Part 63... Compliance With Operating Limits for Organic HAP Emissions From Catalytic Reforming Units As stated in § 63...

  2. Regulating manure application discharges from concentrated animal feeding operations in the United States

    International Nuclear Information System (INIS)

    Centner, Terence J.; Feitshans, Theodore A.

    2006-01-01

    In the United States, reducing pollution from agriculture has received attention due to data suggesting that this is the leading source of impairment of many waterbodies. The federal government revised its regulations governing concentrated animal feeding operations (CAFOs) to enhance governmental oversight over sources of pollution. For the application of manure resulting in pollutant discharges, CAFOs need to implement nutrient management plans. A federal court affirmed the ability of the US federal government to oversee the application of manure from CAFOs that have discharges. Simultaneously, owners and operators of CAFOs who have implemented an appropriate nutrient management plan may forgo securing a permit if their discharges qualify under the agricultural stormwater discharge exemption. - New rules applying to the application of manure by large concentrated animal feeding operations should reduce water contamination

  3. Phase I and II feasibility study report for the 300-FF-5 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phase III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018.

  4. Phase I and II feasibility study report for the 300-FF-5 operable unit

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phase III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018

  5. The U.S.-Russian joint studies on using power reactors to disposition surplus weapons plutonium as spent fuel

    International Nuclear Information System (INIS)

    Chebeskov, A.; Kalashnikov, A.; Pavlovichev, A.

    1997-09-01

    In 1996, the US and the Russian Federation completed an initial joint study of the candidate options for the disposition of surplus weapons plutonium in both countries. The options included long term storage, immobilization of the plutonium in glass or ceramic for geologic disposal, and the conversion of weapons plutonium to spent fuel in power reactors. For the latter option, the US is only considering the use of existing light water reactors (LWRs) with no new reactor construction for plutonium disposition, or the use of Canadian deuterium uranium (CANDU) heavy water reactors. While Russia advocates building new reactors, the cost is high, and the continuing joint study of the Russian options is considering only the use of existing VVER-1000 LWRs in Russia and possibly Ukraine, the existing BN-60O fast neutron reactor at the Beloyarsk Nuclear Power Plant in Russia, or the use of the Canadian CANDU reactors. Six of the seven existing VVER-1000 reactors in Russia and the eleven VVER-1000 reactors in Ukraine are all of recent vintage and can be converted to use partial MOX cores. These existing VVER-1000 reactors are capable of converting almost 300 kg of surplus weapons plutonium to spent fuel each year with minimum nuclear power plant modifications. Higher core loads may be achievable in future years

  6. Start up and commercial operation of Laguna Verde nuclear power plant. Unit 1

    International Nuclear Information System (INIS)

    Torres Ramirez, J.F.

    1991-01-01

    Prior to start up of Laguna Verde nuclear power plant preoperational tests and start tests were performed and they are described in its more eminent aspects. In relation to commercial operation of nuclear station a series of indicator were set to which allow the measurement of performance in unit 1, in areas of plant efficiency and personal safety. Antecedents. Laguna Verde station is located in Alto Lucero municipality in Veracruz state, 70 kilometers north-northeast from port of Veracruz and a 290 kilometers east-northeast from Mexico city. The station consist of two units manufactured by General Electric, with a nuclear system of vapor supply also called boiling water (BWR/5), and with a system turbine-generator manufactured by Mitsubishi. Each unit has a nominal power of 1931 MWt and a level design power of 675 Mwe and a net power of 654 Electric Megawatts

  7. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2, Docket nos. 50-352 and 50-353

    International Nuclear Information System (INIS)

    1989-08-01

    In August 1983 the staff of the Nuclear Regulatory commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for the licenses to operate the Limerick Generating Station, Units 1 and 2, located on a site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 was issued in December 1983. Supplement 2 was issued in October 1984. Supplement 3 was issued in October 1984. Supplement 4 was issued in May 1985. Supplement 5 was issued in July 1985. Supplement 6 was issued in August 1985 and Supplement 7 was issued in April 1989. Supplement 7 addresses the major design differences between Units 1 and 2, the resolution of all issues that remained open when the Unit 1 full-power license was issued, the staff's assessment regarding the application by the licensee to operate Unit 2 and issues that require resolution before issuance of an operating license for Unit 2. Supplements 8 and 9 address further issues that require resolution prior to issuance of an operating license. 1 tab

  8. Method of recovering deeply submerged support strings of a self-lifting floating unit from the ground

    Energy Technology Data Exchange (ETDEWEB)

    Dzhafarov, A M; Leybenzon, S R; Sarkisov, V G

    1982-01-01

    A method is proposed for recovering from the ground deeply submerged strings of self-lifting floating unit consisting of application of vertical forces through a lifter to the support string from surplus buoyancy of the housing submerged into the water. It is distinguished by the fact that in order to improve reliability and to expand the area of operation in water areas with deep occurrence of the bearing ground, submersion of the housing is done with its inclination. This applies to the support string or a group of support strings a permissible momentum, after which water ballast is used towards the housing opposite the inclined, with simultaneous preservation of the permissible moment applied to the support string or group of support strings, and the permissible momentum is determined from the formula-..mu.. = ..sqrt..theta/sup 2/ + /PSI//sup 2//A where M--momentum permitted according to the conditions of strength of the support string; /PSI/--angle of trim; /ETA/-- angle of list; A--coefficient of flexibility of the string submerged into the ground.

  9. Report on geological surveys in the 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Sandness, G.A.

    1991-03-01

    This report describes a set of geophysical surveys performed by the Pacific Northwest Laboratory at selected locations within the 300-FF-1 Operable Unit at Hanford. Field work and preliminary data processing activities were initiated in September 1989. These actions were terminated by the Westinghouse Hanford Company before completion in December 1989. Work was reinitiated in October 1990, to complete the processing of the data that had already been collected and to report the results. Because the field work was only partially completed, the task objectives, as presented in the Statement of Work, could not be fully met. This report is, therefore, a progress report covering the work performed through December 11, 1989. This task involved (1) ground-penetrating radar surveys of the 618-4 and 618-5 Burial Grounds, and (2) ground-penetrating radar and electromagnetic induction surveys along the assumed routes of the abandoned process sewers and radioactive liquid waste sewers in the 300-FF-1 Operable Unit. The surveys in the burial grounds were intended to identify burial trenches and pits, to determine the depth of fill, and to locate waste materials, including any that might be outside the perimeter fences. The surveys along the sewer routes were intended, first, to confirm the locations of the sewers as shown on existing maps or to otherwise accurately determine their locations, and second, to attempt to identify locations of possible leaks. 3 refs., 3 figs., 2 tabs

  10. 40 CFR Table 7 to Subpart Uuu of... - Continuous Compliance With Operating Limits for Metal HAP Emissions From Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Compliance With Operating Limits for Metal HAP Emissions From Catalytic Cracking Units 7 Table 7 to Subpart UUU of Part 63... With Operating Limits for Metal HAP Emissions From Catalytic Cracking Units As stated in § 63.1564(c)(1...

  11. Analysis of the Vertical Takeoff and Landing Unmanned Aerial Vehicle (VTUAV) in Small Unit Urban Operations

    National Research Council Canada - National Science Library

    Cason, Roman

    2004-01-01

    ...) to replace the aging Pioneer Unmanned Aerial Vehicle (UAV) system. This thesis examines the critical elements this platform must possess to effectively support small units operating in urban environments...

  12. Optimal operation method coping with uncertainty in multi-area small power systems

    Directory of Open Access Journals (Sweden)

    Shota Tobaru

    2017-07-01

    Full Text Available Japan contains a vast number of isolated islands. Majority of these islands are poweredby diesel generators (DGs, which are operationally not economical. Therefore, the introduction of renewableenergy systems (RESs into these area is very much vital. However, the variability of RESs asa result of weather condition as well as load demand , battery energy storage system (BESS is broughtinto play. Demand response (DR programs have also been so attractive in the energy management systemsfor the past decades. Among them, the real-time pricing (RTP has been one of the most effectivedemand response program being utilized. This program encourages the customer to increase or reducethe load consumption by varying the electricity price. Also, due to the increase in power transactionmarket, Japan electric power exchange (JEPX has established spot (day-ahead, intraday hour-ahead,and forward market programs. This paper utilizes day-ahead and hour-ahead markets, since these marketscan make it possible to deal with uncertainty related to generated power fluctuations. Therefore,this paper presents the optimal operation method coping with the uncertainties of RESs in multi-areasmall power systems. The proposed method enables flexibility to correspond to the forecasting error byproviding two kinds of power markets among multi-area small power systems and trading the shortageand surplus powers. Furthermore, it accomplishes a stable power supply and demand by RTP. Thus, theproposed method was able to reduce operational cost for multi-area small power systems. The processof creating operational plan for RTP, power trading at the markets and the unit commitment of DGs arealso presented in this paper. Simulation results corroborate the merit of the proposed program.

  13. BP and Mobil present a united front in Europe

    International Nuclear Information System (INIS)

    Jackson, Kim.

    1997-01-01

    BP and Mobil announced the pooling of their European refining, marketing and lubricants businesses in February last year in an unprecedented step to cut costs and improve their competitive position in what is becoming an increasingly cut-throat market. Like their competitors, the two companies had been battling to contented with the continuing surplus refining capacity throughout Europe as well as significantly reduced profit margins on gasoline and other products sold at the pumps. This was particularly the case in the United Kingdom which is still reeling from the effects of the petrol pump price war waged over the past year and in France, too, where the hypermarkets are fiercely battling to retain their market share. (author)

  14. Unit operations used to treat process and/or waste streams at nuclear power plants

    International Nuclear Information System (INIS)

    Godbee, H.W.; Kibbey, A.H.

    1980-01-01

    Estimates are given of the annual amounts of each generic type of LLW [i.e., Government and commerical (fuel cycle and non-fuel cycle)] that is generated at LWR plants. Many different chemical engineering unit operations used to treat process and/or waste streams at LWR plants include adsorption, evaporation, calcination, centrifugation, compaction, crystallization, drying, filtration, incineration, reverse osmosis, and solidification of waste residues. The treatment of these various streams and the secondary wet solid wastes thus generated is described. The various treatment options for concentrates or solid wet wastes, and for dry wastes are discussed. Among the dry waste treatment methods are compaction, baling, and incineration, as well as chopping, cutting and shredding. Organic materials [liquids (e.g., oils or solvents) and/or solids], could be incinerated in most cases. The filter sludges, spent resins, and concentrated liquids (e.g., evaporator concentrates) are usually solidified in cement, or urea-formaldehyde or unsaturated polyester resins prior to burial. Incinerator ashes can also be incorporated in these binding agents. Asphalt has not yet been used. This paper presents a brief survey of operational experience at LWRs with various unit operations, including a short discussion of problems and some observations on recent trends

  15. Automated processing of whole blood units: operational value and in vitro quality of final blood components.

    Science.gov (United States)

    Jurado, Marisa; Algora, Manuel; Garcia-Sanchez, Félix; Vico, Santiago; Rodriguez, Eva; Perez, Sonia; Barbolla, Luz

    2012-01-01

    The Community Transfusion Centre in Madrid currently processes whole blood using a conventional procedure (Compomat, Fresenius) followed by automated processing of buffy coats with the OrbiSac system (CaridianBCT). The Atreus 3C system (CaridianBCT) automates the production of red blood cells, plasma and an interim platelet unit from a whole blood unit. Interim platelet unit are pooled to produce a transfusable platelet unit. In this study the Atreus 3C system was evaluated and compared to the routine method with regards to product quality and operational value. Over a 5-week period 810 whole blood units were processed using the Atreus 3C system. The attributes of the automated process were compared to those of the routine method by assessing productivity, space, equipment and staffing requirements. The data obtained were evaluated in order to estimate the impact of implementing the Atreus 3C system in the routine setting of the blood centre. Yield and in vitro quality of the final blood components processed with the two systems were evaluated and compared. The Atreus 3C system enabled higher throughput while requiring less space and employee time by decreasing the amount of equipment and processing time per unit of whole blood processed. Whole blood units processed on the Atreus 3C system gave a higher platelet yield, a similar amount of red blood cells and a smaller volume of plasma. These results support the conclusion that the Atreus 3C system produces blood components meeting quality requirements while providing a high operational efficiency. Implementation of the Atreus 3C system could result in a large organisational improvement.

  16. Dose rate evaluation of workers on the operation floor in Fukushima-Daiichi Unit 3

    Science.gov (United States)

    Matsushita, Kaoru; Kurosawa, Masahiko; Shirai, Keisuke; Matsuoka, Ippei; Mukaida, Naoki

    2017-09-01

    At Fukushima Daiichi Nuclear Power Plant Unit 3, installation of a fuel handling machine is planned to support the removal of spent fuel. The dose rates at the workplace were calculated based on the source distribution measured using a collimator in order to confirm that the dose rates on the operation floor were within a manageable range. It was confirmed that the accuracy of the source distribution was C/M = 1.0-2.4. These dose rates were then used to plan the work on the operation floor.

  17. Development of in-situ product removal strategies in biocatalysis applying scaled-down unit operations

    DEFF Research Database (Denmark)

    Heintz, Søren; Börner, Tim; Ringborg, Rolf Hoffmeyer

    2017-01-01

    different process steps while operating it as a combined system, giving the possibility to test and characterize the performance of novel process concepts and biocatalysts with minimal influence of inhibitory products. Here the capabilities of performing process development by applying scaled-down unit...... operations are highlighted through a case study investigating the asymmetric synthesis of 1-methyl-3-phenylpropylamine (MPPA) using ω-transaminase, an enzyme in the sub-family of amino transferases (ATAs). An on-line HPLC system was applied to avoid manual sample handling and to semi...

  18. Potential contribution of currently operating nuclear-fueled electric-generating units to reducing US oil consumption

    International Nuclear Information System (INIS)

    Koppe, R.H.; Olson, E.A.J.; Van Howe, K.R.

    1980-01-01

    This study examines the prospect for performance improvement in the 62 light water reactors in operation in the US as of the end of last year and which are deemed to have current commercial design features. These units represent a total net capacity of 49,481 MW(e). In the last two years (1978 to 1979), total capacity factor losses for these units was 36.5%. This study finds that in the short-term, capacity factor improvement of about 16% could be achieved, for example, in response to a short-term energy crisis. In the long-term a gain of perhaps 18% could be achieved. Such gains would represent a decrease in equivalent oil consumption of approximately 350,000 barrels a day. In addition, this study evaluated potential increases in the operating power level of these units, and concluded that a short term power level increase of about 2500 MW(e) could be achieved, in addition to a long term increase of about 1700 MW(e). This total short term power level increase would be equivalent to 138,000 barrels of oil per day

  19. 40 CFR 257.5 - Disposal standards for owners/operators of non-municipal non-hazardous waste disposal units that...

    Science.gov (United States)

    2010-07-01

    ... compliance with §§ 257.7 through 257.30 prior to the receipt of CESQG hazardous waste. (b) Definitions.... Waste management unit boundary means a vertical surface located at the hydraulically downgradient limit.../operators of non-municipal non-hazardous waste disposal units that receive Conditionally Exempt Small...

  20. Continuous operation of NPP Kori Unit 1 - Fireproof paint for cables

    International Nuclear Information System (INIS)

    Wendt, Dipl-Ing. Ruediger; Kim, Duill; Sik, Cho Hong

    2008-01-01

    Fireproof cable coating materials have been used in European NPP, especially in Germany, Russia, Ukraine, Czech Republic, Lithuania, Switzerland. Wide experiences were made during operation while applying these systems. In NPP Kori, Unit 1, a fire proof cable coating project was realised for the first time in a NPP of KHNP. The scope of services of the cable trays to coat amounts to 15,587m 2 . In different fire compartments and rooms the cables should be coated partially respectively completely with the fire proof cable coating system. The extent of cable surfaces to coat was stipulated by KHNP on the basis of an analysis made by KHNP. The project was tendered on the basis of a technical specification of KHNP. The specification is mainly predicted on Korean and US standards. The most important criteria for the fire proof cable coating is resumed as follows: The fireproof cable coating has to assure the fire protection of the cables for a period defined and for operational conditions defined in such a manner that the general conditions for the operation of the cable installation will not be affected

  1. Evaluation of alternatives for the disposition of surplus weapons-usable plutonium

    International Nuclear Information System (INIS)

    Dyer, J.S.; Butler, J.C.; Edmunds, T.

    1997-01-01

    The Department of Energy Record of Decision (ROD) selected alternatives for disposition of surplus, weapons grade plutonium. A major objective of this decision was to prevent the proliferation of nuclear weapons. Other concerns addressed included economic, technical, institutional, schedule, environmental, and health and safety issues. The analysis reported here was conducted in parallel with technical, environmental, and nonproliferation analyses; it uses multiattribute utility theory to combine these considerations in order to facilitate an integrated evaluation of alternatives. This analysis is intended to provide additional insight regarding alternative evaluation and to assist in understanding the rationale for the choice of alternatives recommended in the ROD. Value functions were developed for objectives of disposition, and used to rank alternatives. Sensitivity analyses indicated that the ranking of alternatives for the base case was relatively insensitive to changes in assumptions over reasonable ranges. The analyses support the recommendation of the ROD to pursue parallel development of the vitrification immobilization alternative and the use of existing light water reactors alternative. 27 refs., 109 figs., 20 tabs

  2. Challenges for Nordic power; How to handle the renewable electricity surplus

    Energy Technology Data Exchange (ETDEWEB)

    2010-11-15

    Almost two years after the EU Commission put forth the EUs 202020 Climate and Energy policy package, it is clear that the Nordic region may face investment in new renewable generation at levels that are unprecedented since the deregulation of the Nordic electricity market. This report explores the linkages between political choices and market dynamics on the basis of four scenarios for the Nordic Power Sector towards 2020 and 2030. The aim is to contribute to a common understanding of the market challenges and dynamics among different stakeholders: How do different policy and market drivers interact? What are the long-term implications for prices and the energy balance? And ultimately, what policy choices are available when it comes to handling the expected increase in renewable generation and the looming Nordic energy surplus. Econ Poeyry and THEMA Consulting Group have invited companies, industry organizations and government agencies to participate in the process to elaborate on the issues mentioned above. The participants have contributed through workshops, working groups and conferences. (Author)

  3. An Islamic Perspective on Capital Markets and "Islamic" Securities in Malaysia

    OpenAIRE

    Muhammad Anwar

    1995-01-01

    Financial systems channel funds in an economy from the surplus economic units lacking appropriate investment opportunities to the deficit economic units with such opportunities. The surplus units seeking returns by employing their funds in productive activities and the deficit units interested in exploiting their investment opportunities contact one another through a network of financial markets and institutions in the economy. The participants make financial contracts in ways which satisfy t...

  4. 40 CFR Table 30 to Subpart Uuu of... - Operating Limits for HAP Emissions From Sulfur Recovery Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits for HAP Emissions From Sulfur Recovery Units 30 Table 30 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL..., Table 30 Table 30 to Subpart UUU of Part 63—Operating Limits for HAP Emissions From Sulfur Recovery...

  5. NSSS design and cycle 1 operating history data for Arkansas Nuclear One, Unit-2. Final report

    International Nuclear Information System (INIS)

    Gagne, P.A.

    1981-03-01

    This report contains design and cycle 1 operating data for the Arkansas Nuclear One, Unit-2 nuclear steam supply system. The design data include descriptions of the reactor core, reactor coolant system, and control systems which are a part of the nuclear steam supply system. Operating history data are provided for the period of December 1978 through January 1980. The most important operating history data provided include reactor power, cumulative fuel burnup, control rod position, primary coolant temperature, and a series of power distribution state points

  6. Organization and methodology applied to the control of commissioning tests to guarantee safe operation of nuclear units

    International Nuclear Information System (INIS)

    Clausner, J.P.; Jorel, M.

    1990-12-01

    This paper describes the activities of the Safety Analysis Department (DAS), which provides technical support for the French safety authorities in the specific context of analysis and control of startup test programme quality at each of the different stages of the programme. These activities combine to ensure that the objective of the startup tests is reached, in particular that the functions of each safety-related system are guaranteed in all operating configurations, that the performance levels of all components in the system comply with design criteria and that defects revealed during previous tests have been dealt with correctly. The special case of French nuclear facilities, linked to unit standardization, has made it possible to acquire a large amount of experience with the startup of the 900 MWe units and has illustrated the importance of defining a startup test programme. In 1981, a working group, comprising operating organization and safety authority representatives, studied the lessons which had to be learned from 900 MWe unit startup and the improvements which could be made and taken into account in the 1300 MWe unit startup programme. To illustrate the approach adopted by the DAS, we go on to describe the lessons learned from startup of the first 1300 MWe (P4) units

  7. How do strategic decisions and operative practices affect operating room productivity?

    Science.gov (United States)

    Peltokorpi, Antti

    2011-12-01

    Surgical operating rooms are cost-intensive parts of health service production. Managing operating units efficiently is essential when hospitals and healthcare systems aim to maximize health outcomes with limited resources. Previous research about operating room management has focused on studying the effect of management practices and decisions on efficiency by utilizing mainly modeling approach or before-after analysis in single hospital case. The purpose of this research is to analyze the synergic effect of strategic decisions and operative management practices on operating room productivity and to use a multiple case study method enabling statistical hypothesis testing with empirical data. 11 hypotheses that propose connections between the use of strategic and operative practices and productivity were tested in a multi-hospital study that included 26 units. The results indicate that operative practices, such as personnel management, case scheduling and performance measurement, affect productivity more remarkably than do strategic decisions that relate to, e.g., units' size, scope or academic status. Units with different strategic positions should apply different operative practices: Focused hospital units benefit most from sophisticated case scheduling and parallel processing whereas central and ambulatory units should apply flexible working hours, incentives and multi-skilled personnel. Operating units should be more active in applying management practices which are adequate for their strategic orientation.

  8. Radionuclide inventory and source terms for the surplus production reactors at Hanford

    International Nuclear Information System (INIS)

    Miller, R.L.; Steffes, J.M.

    1987-01-01

    Radionuclide inventories have been estimated for the eight surplus production reactors at Hanford. The inventories listed represent more than 95% of the total curie burden; the remaining 5% is distributed in piping, tunnels, and various other locations within the reactor building and unaccounted for inventories within the reactors or fuel storage basins. Estimates are conservative as the methodology was designed to overestimate the radionuclide inventories in the facilities. The estimated inventory per reactor facility ranges from 13,000 curies to 58,000 curies. The majority of the present inventory consists of tritium, carbon-14, cobalt-60, and nickel-63. The information in this document combines data from past characterization efforts and introduces adjustments for added information and refinement. The inventory of hazardous materials in the reactor facilities is also addressed. This document has been revised to include new reduced inventory figures for chlorine-36. The new figures were derived from recent analysis of irradiated graphite from the 105-kW reactor

  9. The current shortage and future surplus of doctors: a projection of the future growth of the Japanese medical workforce.

    Science.gov (United States)

    Takata, Hideaki; Nagata, Hiroshi; Nogawa, Hiroki; Tanaka, Hiroshi

    2011-05-27

    Starting in the late 1980s, the Japanese government decreased the number of students accepted into medical school each year in order to reduce healthcare spending. The result of this policy is a serious shortage of doctors in Japan today, which has become a social problem in recent years. In an attempt to solve this problem, the Japanese government decided in 2007 to increase the medical student quota from 7625 to 8848. Furthermore, the Democratic Party of Japan (DPJ), Japan's ruling party after the 2009 election, promised in their manifesto to increase the medical student quota to 1.5 times what it was in 2007, in order to raise the number of medical doctors to more than 3.0 per 1000 persons. It should be noted, however, that this rapid increase in the medical student quota may bring about a serious doctor surplus in the future, especially because the population of Japan is decreasing.The purpose of this research is to project the future growth of the Japanese medical doctor workforce from 2008 to 2050 and to forecast whether the proposed additional increase in the student quota will cause a doctor surplus. Simulation modeling of the Japanese medical workforce. Even if the additional increase in the medical student quota promised by the DPJ fails, the number of practitioners is projected to increase from 286 699 (2.25 per 1000 persons) in 2008 to 365 533 (over the national numerical goal of 3.0 per 1000) in 2024. The number of practitioners per 1000 persons is projected to further increase to 3.10 in 2025, to 3.71 in 2035, and to 4.69 in 2050. If the additional increase in the medical student quota promised by the DPJ is realized, the total workforce is projected to rise to 392 331 (3.29 per 1000 persons) in 2025, 464 296 (4.20 per 1,000 persons) in 2035, and 545 230 (5.73 per 1000 persons) in 2050. The plan to increase the medical student quota will bring about a serious doctor surplus in the long run.

  10. Corrective economic dispatch and operational cycles for probabilistic unit commitment with demand response and high wind power

    International Nuclear Information System (INIS)

    Azizipanah-Abarghooee, Rasoul; Golestaneh, Faranak; Gooi, Hoay Beng; Lin, Jeremy; Bavafa, Farhad; Terzija, Vladimir

    2016-01-01

    Highlights: • Suggesting a new UC mixing a probabilistic security and incentive demand response. • Investigating the effects of uncertainty on UC using chance-constraint programming. • Proposing an efficient spinning reserve satisfaction based on a new ED correction. • Presenting a new operational cycles way to convert binary variable to discrete one. - Abstract: We propose a probabilistic unit commitment problem with incentive-based demand response and high level of wind power. Our novel formulation provides an optimal allocation of up/down spinning reserve. A more efficient unit commitment algorithm based on operational cycles is developed. A multi-period elastic residual demand economic model based on the self- and cross-price elasticities and customers’ benefit function is used. In the proposed scheme, the probability of residual demand falling within the up/down spinning reserve imposed by n − 1 security criterion is considered as a stochastic constraint. A chance-constrained method, with a new iterative economic dispatch correction, wind power curtailment, and commitment of cheaper units, is applied to guarantee that the probability of loss of load is lower than a pre-defined risk level. The developed architecture builds upon an improved Jaya algorithm to generate feasible, robust and optimal solutions corresponding to the operational cost. The proposed framework is applied to a small test system with 10 units and also to the IEEE 118-bus system to illustrate its advantages in efficient scheduling of generation in the power systems.

  11. Environmental assessment: Transfer of normal and low-enriched uranium billets to the United Kingdom, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-11-01

    Under the auspices of an agreement between the U.S. and the United Kingdom, the U.S. Department of Energy (DOE) has an opportunity to transfer approximately 710,000 kilograms (1,562,000 pounds) of unneeded normal and low-enriched uranium (LEU) to the United Kingdom; thus, reducing long-term surveillance and maintenance burdens at the Hanford Site. The material, in the form of billets, is controlled by DOE's Defense Programs, and is presently stored as surplus material in the 300 Area of the Hanford Site. The United Kingdom has expressed a need for the billets. The surplus uranium billets are currently stored in wooden shipping containers in secured facilities in the 300 Area at the Hanford Site (the 303-B and 303-G storage facilities). There are 482 billets at an enrichment level (based on uranium-235 content) of 0.71 weight-percent. This enrichment level is normal uranium; that is, uranium having 0.711 as the percentage by weight of uranium-235 as occurring in nature. There are 3,242 billets at an enrichment level of 0.95 weight-percent (i.e., low-enriched uranium). This inventory represents a total of approximately 532 curies. The facilities are routinely monitored. The dose rate on contact of a uranium billet is approximately 8 millirem per hour. The dose rate on contact of a wooden shipping container containing 4 billets is approximately 4 millirem per hour. The dose rate at the exterior of the storage facilities is indistinguishable from background levels

  12. Indian Point Station, Unit 1 and 2. Semiannual operating report No. 24, July--December 1974

    International Nuclear Information System (INIS)

    1975-01-01

    Net electrical power generated by Unit 1 was 519,130 MWH with the reactor critical for 2,400.39 hours and the generator on line for 2,316.14 hours. Unit 2 generated 2,427,828 MWH electrical power, was critical for 3,590.31 hours and the generator was on line for 3,485.41 hours. Operations and maintenance are summarized. Information is presented concerning radioactive effluent releases, occupational personnel radiation protection, primary coolant chemistry, changes, tests, and experiments. Environmental radioactivity is discussed. (U.S.)

  13. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  14. The new local control systems for operating gaseous diffusion plant units at Pierrelatte

    International Nuclear Information System (INIS)

    Delacroix, C.

    1990-01-01

    The development of a local control network for operating gaseous diffusion plant units is presented. The objective of the control system up date was to replace all the information network hardware. The new generation HP1000 calculators and a network architecture were chosen. The validation tests performed in laboratory and in situ, and the management policies towards the personnel during the technical changes are summarized [fr

  15. Contaminant Attenuation and Transport Characterization of 200-DV-1 Operable Unit Sediment Samples

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Szecsody, James E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Qafoku, Nikolla [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Moran, James J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lee, Brady D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Snyder, Michelle M.V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lawter, Amanda R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Resch, Charles T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gartman, Brandy N. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zhong, Lirong [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Nims, Megan K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Saunders, Danielle L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Williams, Benjamin D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Horner, Jacob A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Leavy, Ian I. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Baum, Steven R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Christiansen, Beren B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Clayton, Ray E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); McElroy, Erin M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Appriou, Delphine [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tyrrell, Kimberly J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Striluk, Miranda L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-05-15

    A laboratory study was conducted to quantify contaminant attenuation processes and associated contaminant transport parameters that are needed to evaluate transport of contaminants through the vadose zone to the groundwater. The laboratory study information, in conjunction with transport analyses, can be used as input to evaluate the feasibility of Monitored Natural Attenuation and other remedies for the 200-DV-1 Operable Unit at the Hanford Site.

  16. Implementation and Operational Analysis of an Interactive Intensive Care Unit within a Smart Health Context.

    Science.gov (United States)

    Lopez-Iturri, Peio; Aguirre, Erik; Trigo, Jesús Daniel; Astrain, José Javier; Azpilicueta, Leyre; Serrano, Luis; Villadangos, Jesús; Falcone, Francisco

    2018-01-29

    In the context of hospital management and operation, Intensive Care Units (ICU) are one of the most challenging in terms of time responsiveness and criticality, in which adequate resource management and signal processing play a key role in overall system performance. In this work, a context aware Intensive Care Unit is implemented and analyzed to provide scalable signal acquisition capabilities, as well as to provide tracking and access control. Wireless channel analysis is performed by means of hybrid optimized 3D Ray Launching deterministic simulation to assess potential interference impact as well as to provide required coverage/capacity thresholds for employed transceivers. Wireless system operation within the ICU scenario, considering conventional transceiver operation, is feasible in terms of quality of service for the complete scenario. Extensive measurements of overall interference levels have also been carried out, enabling subsequent adequate coverage/capacity estimations, for a set of Zigbee based nodes. Real system operation has been tested, with ad-hoc designed Zigbee wireless motes, employing lightweight communication protocols to minimize energy and bandwidth usage. An ICU information gathering application and software architecture for Visitor Access Control has been implemented, providing monitoring of the Boxes external doors and the identification of visitors via a RFID system. The results enable a solution to provide ICU access control and tracking capabilities previously not exploited, providing a step forward in the implementation of a Smart Health framework.

  17. Baseline risk assessment for the quarry residuals operable unit of the Weldon Spring Site, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The U.S. Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. Cleanup of the site consists of several integrated components. The quarry residuals operable unit (QROU), consisting of the Weldon Spring quarry and its surrounding area, is one of four operable units being evaluated. In accordance with requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE is conducting a remedial investigation/feasibility study (RI/FS) to determine the proper response to address various contaminated media that constitute the QROU. Specifically, the operable unit consists of the following areas and media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and the bulk waste; groundwater underlying the quarry and surrounding area; and other media located in the surrounding vicinity of the quarry, including surface water and sediment at Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek. An initial evaluation of conditions at the quarry area identified remaining data requirements needed to support the conceptual site exposure and hydrogeological models. These data requirements are discussed in the RI/FS work plan issued in January 1994. Soil contamination located at a property adjacent to the quarry, referred to as Vicinity Property 9 (VP9), was originally part of the scope of the QROU, as discussed in the work plan. However, a decision was subsequently made to remediate this vicinity property as part of cleanup activities for the chemical plant operable unit, as provided for in the Record of Decision (ROD). Remediation of VP9 was completed in early 1996. Hence, this baseline risk assessment (BRA) does not address VP9.

  18. Baseline risk assessment for the quarry residuals operable unit of the Weldon Spring Site, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1998-02-01

    The U.S. Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. Cleanup of the site consists of several integrated components. The quarry residuals operable unit (QROU), consisting of the Weldon Spring quarry and its surrounding area, is one of four operable units being evaluated. In accordance with requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE is conducting a remedial investigation/feasibility study (RI/FS) to determine the proper response to address various contaminated media that constitute the QROU. Specifically, the operable unit consists of the following areas and media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and the bulk waste; groundwater underlying the quarry and surrounding area; and other media located in the surrounding vicinity of the quarry, including surface water and sediment at Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek. An initial evaluation of conditions at the quarry area identified remaining data requirements needed to support the conceptual site exposure and hydrogeological models. These data requirements are discussed in the RI/FS work plan issued in January 1994. Soil contamination located at a property adjacent to the quarry, referred to as Vicinity Property 9 (VP9), was originally part of the scope of the QROU, as discussed in the work plan. However, a decision was subsequently made to remediate this vicinity property as part of cleanup activities for the chemical plant operable unit, as provided for in the Record of Decision (ROD). Remediation of VP9 was completed in early 1996. Hence, this baseline risk assessment (BRA) does not address VP9

  19. Current Conditions Risk Assessment for the 300-FF-5 Groundwater Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Miley, Terri B.; Bunn, Amoret L.; Napier, Bruce A.; Peterson, Robert E.; Becker, James M.

    2007-11-01

    This report updates a baseline risk assessment for the 300 Area prepared in 1994. The update includes consideration of changes in contaminants of interest and in the environment that have occurred during the period of interim remedial action, i.e., 1996 to the present, as well as the sub-regions, for which no initial risk assessments have been conducted. In 1996, a record of decision (ROD) stipulated interim remedial action for groundwater affected by releases from 300 Area sources, as follows: (a) continued monitoring of groundwater that is contaminated above health-based levels to ensure that concentrations continue to decrease, and (b) institutional controls to ensure that groundwater use is restricted to prevent unacceptable exposure to groundwater contamination. In 2000, the groundwater beneath the two outlying sub-regions was added to the operable unit. In 2001, the first 5-year review of the ROD found that the interim remedy and remedial action objectives were still appropriate, although the review called for additional characterization activities. This report includes a current conditions baseline ecological and human health risk assessment using maximum concentrations in the environmental media of the 300-FF-5 Operable Unit and downstream conditions at the City of Richland, Washington. The scope for this assessment includes only current measured environmental concentrations and current use scenarios. Future environmental concentrations and future land uses are not considered in this assessment.

  20. A Robust Open Ascending-price Multi-unit Auction Protocol against False-name Bids

    Science.gov (United States)

    Iwasaki, Atsushi; Yokoo, Makoto; Terada, Kenji

    This paper develops a new ascending-price multi-unit auction protocol that has following characteristics: (i) it has an open format, (ii) sincere bidding is an equilibrium strategy even if the marginal utilities of each agent can increase and agents can submit false-name bids. False-name bids are bids submitted under fictitious names such as multiple e-mail addresses, which can be done easily in the Internet. This is the first protocol that has these two characteristics. We show that our new protocol outperforms an existing protocol, which satisfies (ii), with respect to the social surplus and the seller's revenue.