WorldWideScience

Sample records for support execution planning

  1. Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

    Science.gov (United States)

    Marquez, Jessica J.; Pyrzak, Guy; Hashemi, Sam; Ahmed, Samia; McMillin, Kevin Edward; Medwid, Joseph Daniel; Chen, Diana; Hurtle, Esten

    2013-01-01

    Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

  2. Project Execution Plan, Rev. 3

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  3. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  4. Project Execution Plan,Rev. 3; FINAL

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  5. LSC (X) Logistics Planning Support, Task 1 Requirements Definition

    National Research Council Canada - National Science Library

    Scalzo, John

    2004-01-01

    .... During the early stage after vessel delivery, there is a requirement to manage this plan through a transition period until the designated support manager is under contract and/or provided with the resources to execute the plan.

  6. Using Planning, Scheduling and Execution for Autonomous Mars Rover Operations

    Science.gov (United States)

    Estlin, Tara A.; Gaines, Daniel M.; Chouinard, Caroline M.; Fisher, Forest W.; Castano, Rebecca; Judd, Michele J.; Nesnas, Issa A.

    2006-01-01

    With each new rover mission to Mars, rovers are traveling significantly longer distances. This distance increase raises not only the opportunities for science data collection, but also amplifies the amount of environment and rover state uncertainty that must be handled in rover operations. This paper describes how planning, scheduling and execution techniques can be used onboard a rover to autonomously generate and execute rover activities and in particular to handle new science opportunities that have been identified dynamically. We also discuss some of the particular challenges we face in supporting autonomous rover decision-making. These include interaction with rover navigation and path-planning software and handling large amounts of uncertainty in state and resource estimations. Finally, we describe our experiences in testing this work using several Mars rover prototypes in a realistic environment.

  7. Dynamics in self-regulation : Plan execution self-efficacy and mastery of action plans

    OpenAIRE

    Scholz, Urte; Sniehotta, Falco F.; Schüz, Benjamin; Oeberst, Andries

    2007-01-01

    This study investigated whether an individual's plan execution self-efficacy precedes mastery of the respective action plan or vice versa. Study participants were 122 cardiac rehabilitation patients. Plan execution self-efficacy and mastery of a personal action plan on physical activity were assessed each week for 6 weeks after discharge from rehabilitation. Physical exercise was assessed 2 months after discharge. Multilevel cross-lagged panel analyses resulted in a positive effect of mastery...

  8. Rewriting Logic Semantics of a Plan Execution Language

    Science.gov (United States)

    Dowek, Gilles; Munoz, Cesar A.; Rocha, Camilo

    2009-01-01

    The Plan Execution Interchange Language (PLEXIL) is a synchronous language developed by NASA to support autonomous spacecraft operations. In this paper, we propose a rewriting logic semantics of PLEXIL in Maude, a high-performance logical engine. The rewriting logic semantics is by itself a formal interpreter of the language and can be used as a semantic benchmark for the implementation of PLEXIL executives. The implementation in Maude has the additional benefit of making available to PLEXIL designers and developers all the formal analysis and verification tools provided by Maude. The formalization of the PLEXIL semantics in rewriting logic poses an interesting challenge due to the synchronous nature of the language and the prioritized rules defining its semantics. To overcome this difficulty, we propose a general procedure for simulating synchronous set relations in rewriting logic that is sound and, for deterministic relations, complete. We also report on the finding of two issues at the design level of the original PLEXIL semantics that were identified with the help of the executable specification in Maude.

  9. Planning and Execution: The Spirit of Opportunity for Robust Autonomous Systems

    Science.gov (United States)

    Muscettola, Nicola

    2004-01-01

    One of the most exciting endeavors pursued by human kind is the search for life in the Solar System and the Universe at large. NASA is leading this effort by designing, deploying and operating robotic systems that will reach planets, planet moons, asteroids and comets searching for water, organic building blocks and signs of past or present microbial life. None of these missions will be achievable without substantial advances in.the design, implementation and validation of autonomous control agents. These agents must be capable of robustly controlling a robotic explorer in a hostile environment with very limited or no communication with Earth. The talk focuses on work pursued at the NASA Ames Research center ranging from basic research on algorithm to deployed mission support systems. We will start by discussing how planning and scheduling technology derived from the Remote Agent experiment is being used daily in the operations of the Spirit and Opportunity rovers. Planning and scheduling is also used as the fundamental paradigm at the core of our research in real-time autonomous agents. In particular, we will describe our efforts in the Intelligent Distributed Execution Architecture (IDEA), a multi-agent real-time architecture that exploits artificial intelligence planning as the core reasoning engine of an autonomous agent. We will also describe how the issue of plan robustness at execution can be addressed by novel constraint propagation algorithms capable of giving the tightest exact bounds on resource consumption or all possible executions of a flexible plan.

  10. Convergence of logistics planning and execution in outsourcing

    Directory of Open Access Journals (Sweden)

    Angela A. D’amato

    2015-06-01

    Full Text Available Background: Logistics service providers (LSPs are becoming increasingly involved in their clients’ businesses. Beyond just providing vehicles and buildings, LSPs are now becoming involved with knowledge-related work that is connected to the traditional services provided. Objectives: To investigate the likelihood and potential value of LSPs extending their range of services to their clients by means of a convergence of planning and execution activities. Method: In the research through a literature review and empirical study presented here, attention is given to the practical impact that convergence planning and execution functions have on business success, as well as how selected clients of an LSP (referred to in this article as logistics company A or LCA perceive the impact of increased integration of LCA within its businesses. The results should assist LCA and other LSPs considering the same objective to ascertain the opportunities and key requirements associated with a strategy to converge planning and execution activities for their clients. Results: The study found that the vast majority of respondents see value in the convergence of planning and execution activities. Conclusion: Such convergence will be challenging, owing to the importance of the planning function for clients, as well as key collaborative and measurement requirements that will have to be put in place for successful business integration.

  11. Succession planning: a call to action for nurse executives.

    Science.gov (United States)

    Trepanier, Sylvain; Crenshaw, Jeannette T

    2013-10-01

    To discuss the organisational benefits of strategic succession planning in acute care hospital settings as a responsibility of chief nurse executives. A formal succession planning process is crucial to the financial and operational viability and sustainability of acute care hospitals. A succession plan is an essential business strategy that promotes effective leadership transition and continuity while maintaining productivity. Nursing and business literature were reviewed; reports contrasting institutions with and without succession plans were examined; and, operational implications were considered. It is imperative that chief nurse executives respond to the business benefits of an effective succession planning programme, identify common barriers and solutions, and implement best practices for a successful strategic succession planning programme. A strategic succession planning programme may offer many benefits to an acute care hospital, including improved retention rates, increased staff engagement and enhanced financial performance. Considering the ageing nursing workforce and the potential increase in demand for nursing services in the near future, nurse executives and other nurse leaders must actively engage in a formal succession planning process. A formal succession planning programme will help to provide strategic leadership continuity, operational effectiveness and improved quality of care. © 2013 John Wiley & Sons Ltd.

  12. Radiological control FY 1995 site support program plan WBS 6.7.2.4

    International Nuclear Information System (INIS)

    1994-09-01

    The 1995 Site Support Program Plan (SSPP) brings year planning and execution year planning into a single document. The plan presented consists of the following four major sections: Overview and Introduction - Health physics has been renamed Radiological Control (RadCon) with the role of protecting workers, the public and the environment from the harmful effects of radiation resulting from the DOE Hanford Site Operations; Cost Baselines which contains cost, technical and schedule baselines; Execution Year work Plan - cost summaries and detailed descriptions of the work to be done; Appendix - including brief description of other project activities directly coupled to RadCon

  13. Radiological control FY 1995 site support program plan WBS 6.7.2.4

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The 1995 Site Support Program Plan (SSPP) brings year planning and execution year planning into a single document. The plan presented consists of the following four major sections: Overview and Introduction - Health physics has been renamed Radiological Control (RadCon) with the role of protecting workers, the public and the environment from the harmful effects of radiation resulting from the DOE Hanford Site Operations; Cost Baselines which contains cost, technical and schedule baselines; Execution Year work Plan - cost summaries and detailed descriptions of the work to be done; Appendix - including brief description of other project activities directly coupled to RadCon.

  14. Evolving from Planning and Scheduling to Real-Time Operations Support: Design Challenges

    Science.gov (United States)

    Marquez, Jessica J.; Ludowise, Melissa; McCurdy, Michael; Li, Jack

    2010-01-01

    Versions of Scheduling and Planning Interface for Exploration (SPIFe) have supported a variety of mission operations across NASA. This software tool has evolved and matured over several years, assisting planners who develop intricate schedules. While initially conceived for surface Mars missions, SPIFe has been deployed in other domains, where people rather than robotic explorers, execute plans. As a result, a diverse set of end-users has compelled growth in a new direction: supporting real-time operations. This paper describes the new needs and challenges that accompany this development. Among the key features that have been built for SPIFe are current time indicators integrated into the interface and timeline, as well as other plan attributes that enable execution of scheduled activities. Field tests include mission support for the Lunar CRater Observation and Sensing Satellite (LCROSS), NASA Extreme Environment Mission Operations (NEEMO) and Desert Research and Technology Studies (DRATS) campaigns.

  15. Methodology development to support NPR strategic planning. Final report

    International Nuclear Information System (INIS)

    1996-01-01

    This report covers the work performed in support of the Office of New Production Reactors during the 9 month period from January through September 1990. Because of the rapid pace of program activities during this time period, the emphasis on work performed shifted from the strategic planning emphasis toward supporting initiatives requiring a more immediate consideration and response. Consequently, the work performed has concentrated on researching and helping identify and resolve those issues considered to be of most immediate concern. Even though they are strongly interrelated, they can be separated into two broad categories as follows: The first category encompasses program internal concerns. Included are issues associated with the current demand for accelerating staff growth, satisfying the immediate need for appropriate skill and experience levels, team building efforts necessary to assure the development of an effective operating organization, ability of people and organizations to satisfactorily understand and execute their assigned roles and responsibilities, and the general facilitation of inter/intra organization communications and working relationships. The second category encompasses program execution concerns. These include those efforts required in development of realistic execution plans and implementation of appropriate control mechanisms which provide for effective forecasting, planning, managing, and controlling of on-going (or soon to be) program substantive activities according to the master integrated schedule and budget

  16. Planning and monitoring the execution of web service requests

    NARCIS (Netherlands)

    Lazovik, Alexander; Aiello, Marco; Papazoglou, Mike

    2003-01-01

    Interaction with web services enabled marketplaces would be greatly facilitated if users were given a high level service request language to express their goals in complex business domains. This could be achieved by using a planning framework which monitors the execution of planned goals against

  17. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  18. What's next? : operational support for business process execution

    NARCIS (Netherlands)

    Schonenberg, M.H.

    2012-01-01

    In the last decade flexibility has become an increasingly important in the area of business process management. Information systems that support the execution of the process are required to work in a dynamic environment that imposes changing demands on the execution of the process. In academia and

  19. Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A...Program Name Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A) DoD Component Air Force Responsible Office Program...APB) dated March 9, 2015 DCAPES Inc 2A 2016 MAR UNCLASSIFIED 4 Program Description Deliberate and Crisis Action Planning and Execution Segments

  20. Deliberate and Crisis Action Planning and Execution Segments Increment 2B (DCAPES Inc 2B)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Deliberate and Crisis Action Planning and Execution Segments Increment 2B (DCAPES Inc 2B...Information Program Name Deliberate and Crisis Action Planning and Execution Segments Increment 2B (DCAPES Inc 2B) DoD Component Air Force Responsible Office...been established. DCAPES Inc 2B 2016 MAR UNCLASSIFIED 4 Program Description Deliberate and Crisis Action Planning and Execution Segments (DCAPES) is

  1. The impact of motivation and teachers' autonomy support on children's executive functions.

    Science.gov (United States)

    Sosic-Vasic, Zrinka; Keis, Oliver; Lau, Maren; Spitzer, Manfred; Streb, Judith

    2015-01-01

    The present study investigates the interplay of executive functions, motivation, and teacher's autonomy support in school context. In a cross-sectional study design 208 students from different school types completed a standardized motivation questionnaire and processed two executive function tasks. All teachers who teach these students were asked about their autonomy supporting behavior by a standardized test. Multilevel analyses assessed the effects of the student's motivation and their teachers' autonomy support on student's executive functions. Our results show considerable relationships between these variables: high executive function capacities came along with teacher's autonomy support and student's intrinsic motivation styles, whereas low executive function capacities were related to external regulation styles. The results indicate the importance of autonomy support in school instruction and disclose the need to popularize the self-regulation approach.

  2. The Impact of Motivation and Teachers’ Autonomy Support on Children’s Executive Functions

    Directory of Open Access Journals (Sweden)

    Zrinka eSosic-Vasic

    2015-02-01

    Full Text Available The present study investigates the interplay of executive functions, motivation and teacher’s autonomy support in school context. In a cross-sectional study design 208 students from different school types completed a standardized motivation questionnaire and processed two executive function tasks. All teachers who teach these students were asked about their autonomy supporting behavior by a standardized test. Multilevel analyses assessed the effects of the student’s motivation and their teachers’ autonomy support on student’s executive functions. Our results show considerable relationships between these variables: high executive function capacities came along with teacher’s autonomy support and student’s intrinsic motivation styles, whereas low executive function capacities were related to external regulation styles. The results indicate the importance of autonomy support in school instruction and disclose the need to popularize the self-regulation approach.

  3. The impact of motivation and teachers’ autonomy support on children’s executive functions

    Science.gov (United States)

    Sosic-Vasic, Zrinka; Keis, Oliver; Lau, Maren; Spitzer, Manfred; Streb, Judith

    2015-01-01

    The present study investigates the interplay of executive functions, motivation, and teacher’s autonomy support in school context. In a cross-sectional study design 208 students from different school types completed a standardized motivation questionnaire and processed two executive function tasks. All teachers who teach these students were asked about their autonomy supporting behavior by a standardized test. Multilevel analyses assessed the effects of the student’s motivation and their teachers’ autonomy support on student’s executive functions. Our results show considerable relationships between these variables: high executive function capacities came along with teacher’s autonomy support and student’s intrinsic motivation styles, whereas low executive function capacities were related to external regulation styles. The results indicate the importance of autonomy support in school instruction and disclose the need to popularize the self-regulation approach. PMID:25762958

  4. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 970.5223-1 Section 970.5223-1 Federal Acquisition... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and...

  5. Composable Framework Support for Software-FMEA Through Model Execution

    Science.gov (United States)

    Kocsis, Imre; Patricia, Andras; Brancati, Francesco; Rossi, Francesco

    2016-08-01

    Performing Failure Modes and Effect Analysis (FMEA) during software architecture design is becoming a basic requirement in an increasing number of domains; however, due to the lack of standardized early design phase model execution, classic SW-FMEA approaches carry significant risks and are human effort-intensive even in processes that use Model-Driven Engineering.Recently, modelling languages with standardized executable semantics have emerged. Building on earlier results, this paper describes framework support for generating executable error propagation models from such models during software architecture design. The approach carries the promise of increased precision, decreased risk and more automated execution for SW-FMEA during dependability- critical system development.

  6. Project Execution Plan, Waste Management Division, Nevada Operations Office, U.S. Department of Energy, April 2000

    International Nuclear Information System (INIS)

    2000-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls

  7. Pu-238 Supply Program Project Execution Plan

    International Nuclear Information System (INIS)

    Wham, Robert M.; Martin, Sherman

    2012-01-01

    This Pu-238 Supply Program Project Execution Plan (PEP) summarizes critical information and processes necessary to manage the program. The PEP is the primary agreement regarding planning and objectives between The Department of Energy Office of Nuclear Energy (DOE NE-75), Oak Ridge National Laboratory Site Office (OSO) and the Oak Ridge National Laboratory (ORNL). The acquisition executive (AE) will approve the PEP. The PEP is a living document that will be reviewed and revised periodically until the project is complete. The purpose of the project is to reestablish the capability to produce plutonium-238 (Pu-238) domestically. This capability consists primarily of procedures, processes, and design information, not capital assets. As such, the project is not subject to the requirements of DOE O 413.3B, but it will be managed using the project management principles and best practices defined there. It is likely that some capital asset will need to be acquired to complete tasks within the project. As these are identified, project controls and related processes will be updated as necessary. Because the project at its initiation was envisioned to require significant capital assets, Critical Decision 0 (CD-0) was conducted in accordance with DOE O 413.3B, and the mission need was approved on December 9, 2003, by William Magwood IV, director of the Office of Nuclear Energy (NE), Science and Technology, DOE. No date was provided for project start-up at that time. This PEP is consistent with the strategy described in the June 2010 report to Congress, Start-up Plan for Plutonium-238 Production for Radioisotope Power Systems.

  8. Training Effectiveness Assessment of Red Cape: Crisis Action Planning and Execution

    National Research Council Canada - National Science Library

    Schaefer, Peter S; Shadrick, Scott B; Beaubien, Jeff; Crabb, Brian T

    2008-01-01

    The crisis response training program Red Cape: Crisis Action Planning and Execution uses theme-based training and multimedia scenarios to instill expert thinking patterns in crisis response personnel...

  9. A Test of Motor (Not Executive) Planning in Developmental Coordination Disorder and Autism

    NARCIS (Netherlands)

    van Swieten, Lisa M.; van Bergen, Elsje; Williams, Justin H G; Wilson, Andrew D.; Plumb, Mandy S.; Kent, Samuel W.; Mon-Williams, Mark A.

    Grip selection tasks have been used to test "planning" in both autism and developmental coordination disorder (DCD). We differentiate between motor and executive planning and present a modified motor planning task. Participants grasped a cylinder in 1 of 2 orientations before turning it clockwise or

  10. A test of motor (not executive) planning in developmental coordination disorder and autism

    NARCIS (Netherlands)

    van Swieten, L.M.; van Bergen, E.; Williams, J.H.G.; Wilson, A.D.; Plumb, M.S.; Kent, S.W.; Mon-Williams, M.A.

    2010-01-01

    Grip selection tasks have been used to test "planning" in both autism and developmental coordination disorder (DCD). We differentiate between motor and executive planning and present a modified motor planning task. Participants grasped a cylinder in 1 of 2 orientations before turning it clockwise or

  11. Executive Support of Information Technology and Information Systems in Australian Hospitals: an empirical study

    Directory of Open Access Journals (Sweden)

    Graeme Rose

    1997-11-01

    Full Text Available Little is known regarding the form executive support should take for the progressive use of information technology and information systems [FT] within organisations. This study applies the theory developed by Jarvenpaa and Ives (1991 who examined two forms of support provided by chief executive officers. These were executive participation, a set of IT-related activities, and executive involvement, a psychological state reflecting the importance of IT for the organisation's success. Our research, using data obtained from a questionnaire mailed to a sample of Australian hospitals, measures the relationships between these two forms of support and the progressive use of IT. Our statistical analysis supports the findings of Jarvenpaa and Ives (1991, who found a stronger relationship between executive involvement and the progressive use of IT. Using Australian hospitals allowed Jarvenpaa and Ives' (1991 theory to be applied in a different environment, increasing its external validity. Firm size was also found to have a positive relationship with the progressive use of IT independent of the two forms of executive support.

  12. Optimization-based decision support to assist in logistics planning for hospital evacuations.

    Science.gov (United States)

    Glick, Roger; Bish, Douglas R; Agca, Esra

    2013-01-01

    The evacuation of the hospital is a very complex process and evacuation planning is an important part of a hospital's emergency management plan. There are numerous factors that affect the evacuation plan including the nature of threat, availability of resources and staff the characteristics of the evacuee population, and risk to patients and staff. The safety and health of patients is of fundamental importance, but safely moving patients to alternative care facilities while under threat is a very challenging task. This article describes the logistical issues and complexities involved in planning and execution of hospital evacuations. Furthermore, this article provides examples of how optimization-based decision support tools can help evacuation planners to better plan for complex evacuations by providing real-world solutions to various evacuation scenarios.

  13. EEG signatures of arm isometric exertions in preparation, planning and execution.

    Science.gov (United States)

    Nasseroleslami, Bahman; Lakany, Heba; Conway, Bernard A

    2014-04-15

    The electroencephalographic (EEG) activity patterns in humans during motor behaviour provide insight into normal motor control processes and for diagnostic and rehabilitation applications. While the patterns preceding brisk voluntary movements, and especially movement execution, are well described, there are few EEG studies that address the cortical activation patterns seen in isometric exertions and their planning. In this paper, we report on time and time-frequency EEG signatures in experiments in normal subjects (n=8), using multichannel EEG during motor preparation, planning and execution of directional centre-out arm isometric exertions performed at the wrist in the horizontal plane, in response to instruction-delay visual cues. Our observations suggest that isometric force exertions are accompanied by transient and sustained event-related potentials (ERP) and event-related (de-)synchronisations (ERD/ERS), comparable to those of a movement task. Furthermore, the ERPs and ERD/ERS are also observed during preparation and planning of the isometric task. Comparison of ear-lobe-referenced and surface Laplacian ERPs indicates the contribution of superficial sources in supplementary and pre-motor (FC(z)), parietal (CP(z)) and primary motor cortical areas (C₁ and FC₁) to ERPs (primarily negative peaks in frontal and positive peaks in parietal areas), but contribution of deep sources to sustained time-domain potentials (negativity in planning and positivity in execution). Transient and sustained ERD patterns in μ and β frequency bands of ear-lobe-referenced and surface Laplacian EEG indicate the contribution of both superficial and deep sources to ERD/ERS. As no physical displacement happens during the task, we can infer that the underlying mechanisms of motor-related ERPs and ERD/ERS patterns do not only depend on change in limb coordinate or muscle-length-dependent ascending sensory information and are primary generated by motor preparation, direction

  14. Resource Planning for SPARQL Query Execution on Data Sharing Platforms

    DEFF Research Database (Denmark)

    Hagedorn, Stefan; Hose, Katja; Sattler, Kai-Uwe

    2014-01-01

    To increase performance, data sharing platforms often make use of clusters of nodes where certain tasks can be executed in parallel. Resource planning and especially deciding how many processors should be chosen to exploit parallel processing is complex in such a setup as increasing the number...

  15. Advanced Fuels Campaign Execution Plan

    Energy Technology Data Exchange (ETDEWEB)

    Kemal Pasamehmetoglu

    2010-10-01

    The purpose of the Advanced Fuels Campaign (AFC) Execution Plan is to communicate the structure and management of research, development, and demonstration (RD&D) activities within the Fuel Cycle Research and Development (FCRD) program. Included in this document is an overview of the FCRD program, a description of the difference between revolutionary and evolutionary approaches to nuclear fuel development, the meaning of science-based development of nuclear fuels, and the “Grand Challenge” for the AFC that would, if achieved, provide a transformational technology to the nuclear industry in the form of a high performance, high reliability nuclear fuel system. The activities that will be conducted by the AFC to achieve success towards this grand challenge are described and the goals and milestones over the next 20 to 40 year period of research and development are established.

  16. Advanced Fuels Campaign Execution Plan

    Energy Technology Data Exchange (ETDEWEB)

    Kemal Pasamehmetoglu

    2011-09-01

    The purpose of the Advanced Fuels Campaign (AFC) Execution Plan is to communicate the structure and management of research, development, and demonstration (RD&D) activities within the Fuel Cycle Research and Development (FCRD) program. Included in this document is an overview of the FCRD program, a description of the difference between revolutionary and evolutionary approaches to nuclear fuel development, the meaning of science-based development of nuclear fuels, and the 'Grand Challenge' for the AFC that would, if achieved, provide a transformational technology to the nuclear industry in the form of a high performance, high reliability nuclear fuel system. The activities that will be conducted by the AFC to achieve success towards this grand challenge are described and the goals and milestones over the next 20 to 40 year period of research and development are established.

  17. HANDI 2000 project execution plan

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    The HANDI 2000 project will meet some of the major objectives and goals of the PHMC Management and Integration Plan, HNF-MP-00/Rev. 11, by integrating the major Hanford business processes and their supporting information systems

  18. Organizational Strategic Planning and Execution: Should Governmental Organizations Rely on Strategic Planning for the Success of the Organization?

    National Research Council Canada - National Science Library

    Young, Lester; Reynolds, Thomas E; Harris, II, Thomas L

    2007-01-01

    .... The utilization of this tool can yield positive results for many companies and organizations. On the other hand, if the strategic plan is not utilized, it becomes a costly paperweight on a table in the executive suite...

  19. ERGONOMIC ASPECTS IN THE PLANNING AND EXECUTION OF PROJECTS: A TEXTILE PRODUCTS DISTRIBUTION CENTER PROJECT CASE STUDY

    Directory of Open Access Journals (Sweden)

    Emerson Lourenço da Silva

    2013-01-01

    Full Text Available The planning and execution phases of a distribution center project of a large textile industry was made, evaluating the ergonomic aspects related to the operations to be performed in the facility and staff anthropometric data. The ergonomic collaborative analysis of the tasks associated with the method of movement plotting, guided the planning of the picking, manual induction and order consolidation areas from the distribution center. Using this methodology, it was possible to obtain a proper ergonomically project planning and execution of the three studied areas.

  20. Quality planning and executive force of program files in quality management

    International Nuclear Information System (INIS)

    Sun Danyu

    2008-01-01

    This paper discussed the quality planning in quality management. In the quality planning, the quality objectives, the quality liabilities and the procedures shall be developed, grading supervise shall be exercised, quality assurance program shall be established, and requirements on resource and documents shall be defined. At the same time, we shall also intensify and enhance the execute force of program documentation, supervise and inspect the implementation result, establish detailed check indicators, and bring up the requirement on how to improve the quality of products. (author)

  1. Modern Shale Gas Horizontal Drilling: Review of Best Practices for Exploration Phase Planning and Execution

    Institute of Scientific and Technical Information of China (English)

    Nathaniel Harding; Stephen Smith; John Shelton; Mike D. Bumaman

    2009-01-01

    The challenging characteristics of shale formations often require horizontal drilling to economically develop their potential. While every shale gas play is unique, there are several best practices for the proper planning and execution of a horizontal well. In planning a horizontal well, the optimal method and technology for building inclination and extending the lateral section must be determined. Properly specified logging-while-drilling tools are essential to keep the wellbore within the target formation. Planning must also focus on casing design. Doing so will help ensure stability and enable reliable and productive completions. Shales pose a challenge for these elements of well planning due to their thin strata and potentially low mechanical competence when foreign fluids are introduced. Once a plan is developed, executing it is even more important to prove a viable exploration program. Fast, efficient drilling with wellbore control and minimal torque and drag should be the priority. This may be achieved by focusing on fluid hydraulics and rheology and bottom hole assembly. Managed pressure drilling (MPD) will help fast drilling, well control and stability. If MPD can be combined with new generation rotary steerable systems that allow the drill string to maintain rotation, impressive efficiencies are possible. Modern drilling parameter analysis represents the newest opportunity for executing shale gas horizontal wells. A method for ROP analysis to improve operational parameters and equipment selection is also proposed.

  2. Executive Order 13693: Planning for Federal Sustainability in the Next Decade; Guidance for Federal Agencies on Executive Order 13693 -- Federal Fleet Management

    Energy Technology Data Exchange (ETDEWEB)

    2017-01-01

    The U.S. Department of Energy (DOE) and U.S. General Services Administration (GSA) are issuing comprehensive guidance on the federal fleet requirements of Executive Order (E.O.) 13693, Planning for Federal Sustainability in the Next Decade (E.O. 13693), to help federal agencies subject to the executive order develop an overall approach for reducing total fleet greenhouse gas (GHG) emissions and fleet-wide per-mile GHG emissions, and ensure the approach helps these agencies meet their requirements. Three key GHG emissions reduction strategies - right-sizing fleets to mission, increasing fleet fuel efficiency, and displacing petroleum with alternative fuel use - are essential to meeting the requirements and are discussed further in this document. This guidance document is intended to help agency Chief Sustainability Officers (CSOs) and headquarters fleet managers craft tailored executable plans that achieve the purpose of E.O. 13693. The guidance will assist agencies in completing the first phase of a comprehensive fleet management framework by identifying the strategies each agency will then implement to meet or exceed its requirements.

  3. The impact of motivation and teachers? autonomy support on children?s executive functions

    OpenAIRE

    Sosic-Vasic, Zrinka; Keis, Oliver; Lau, Maren; Spitzer, Manfred; Streb, Judith

    2015-01-01

    The present study investigates the interplay of executive functions, motivation, and teacher’s autonomy support in school context. In a cross-sectional study design 208 students from different school types completed a standardized motivation questionnaire and processed two executive function tasks. All teachers who teach these students were asked about their autonomy supporting behavior by a standardized test. Multilevel analyses assessed the effects of the student’s motivation and their teac...

  4. The Impact of Motivation and Teachers’ Autonomy Support on Children’s Executive Functions

    OpenAIRE

    Zrinka eSosic-Vasic; Oliver eKeis; Maren eLau; Manfred eSpitzer; Manfred eSpitzer; Judith eStreb

    2015-01-01

    The present study investigates the interplay of executive functions, motivation and teacher’s autonomy support in school context. In a cross-sectional study design 208 students from different school types completed a standardized motivation questionnaire and processed two executive function tasks. All teachers who teach these students were asked about their autonomy supporting behavior by a standardized test. Multilevel analyses assessed the effects of the student’s motivation and their teach...

  5. Proceedings of the executive dialogue on resource planning and investment decisions

    International Nuclear Information System (INIS)

    Porter, K.

    1992-01-01

    At the invitation of the Secretary of the US Department of Energy (DOE), more than sixty electric utility executives met with twenty state regulators and twenty senior executives of major intervenor groups to discuss the issues that define the future of integrated resource planning (IRP). During the last decade, the concept of IRP (or least-cost planning as it was known earlier) emerged as an important utility and energy planning tool. Since 1986, IRP has been utilized, to some degree, in as many as 27 states. DOE participated in the rapid expansion of IRP through modest investments in pivotal programs and projects. The primary purpose of this meeting was to assess the status of IRP and to discuss the steps needed to strengthen its role in state and national energy policy. The one-and-one-half-day meeting began with a brief plenary session consisting of three presentations to set the context for the workshop and raise critical IRP issues by three acknowledged leaders from utilities, regulators, and intervenors. This was followed by discussions in small groups for the balance of the day. The meeting concluded with a two-part plenary session that (1) summarized the findings of the discussion groups and (2) presented conclusions and recommendations representing the collective views of each sector (utility, regulatory, and intervenor) expressed during the workshop

  6. Supporting executive functions during children's preliteracy learning with the computer

    NARCIS (Netherlands)

    Sande, E. van de; Segers, P.C.J.; Verhoeven, L.T.W.

    2016-01-01

    The present study examined how embedded activities to support executive functions helped children to benefit from a computer intervention that targeted preliteracy skills. Three intervention groups were compared on their preliteracy gains in a randomized controlled trial design: an experimental

  7. A Provenance-Based Infrastructure to Support the Life Cycle of Executable Papers

    DEFF Research Database (Denmark)

    2011-01-01

    As publishers establish a greater online presence as well as infrastructure to support the distribution of more varied information, the idea of an executable paper that enables greater interaction has developed. An executable paper provides more information for computational experiments and results...... than the text, tables, and figures of standard papers. Executable papers can bundle computational content that allow readers and reviewers to interact, validate, and explore experiments. By including such content, authors facilitate future discoveries by lowering the barrier to reproducing...... and extending results. We present an infrastructure for creating, disseminating, and maintaining executable papers. Our approach is rooted in provenance, the documentation of exactly how data, experiments, and results were generated. We seek to improve the experience for everyone involved in the life cycle...

  8. General Temporal Knowledge for Planning and Data Mining

    Science.gov (United States)

    Morris, Robert; Khatib, Lina

    2001-01-01

    We consider the architecture of systems that combine temporal planning and plan execution and introduce a layer of temporal reasoning that potential1y improves both the communication between humans and such systems, and the performance of the temporal planner itself. In particular, this additional layer simultaneously supports more flexibility in specifying and maintaining temporal constraints on plans within an uncertain and changing execution environment, and the ability to understand and trace the progress of plan execution. It is shown how a representation based on single set of abstractions of temporal information can be used to characterize the reasoning underlying plan generation and execution interpretation. The complexity of such reasoning is discussed.

  9. Counting, enumerating and sampling of execution plans in a cost-based query optimizer

    NARCIS (Netherlands)

    F. Waas; C.A. Galindo-Legaria

    1999-01-01

    textabstractTesting an SQL database system by running large sets of deterministic or stochastic SQL statements is common practice in commercial database development. However, code defects often remain undetected as the query optimizer's choice of an execution plan is not only depending on

  10. Evaluation of Crew-Centric Onboard Mission Operations Planning and Execution Tool: Year 2

    Science.gov (United States)

    Hillenius, S.; Marquez, J.; Korth, D.; Rosenbaum, M.; Deliz, Ivy; Kanefsky, Bob; Zheng, Jimin

    2018-01-01

    Currently, mission planning for the International Space Station (ISS) is largely affected by ground operators in mission control. The task of creating a week-long mission plan for ISS crew takes dozens of people multiple days to complete, and is often created far in advance of its execution. As such, re-planning or adapting to changing real-time constraints or emergent issues is similarly taxing. As we design for future mission operations concepts to other planets or areas with limited connectivity to Earth, more of these ground-based tasks will need to be handled autonomously by the crew onboard.There is a need for a highly usable (including low training time) tool that enables efficient self-scheduling and execution within a single package. The ISS Program has identified Playbook as a potential option. It already has high crew acceptance as a plan viewer from previous analogs and can now support a crew self-scheduling assessment on ISS or on another mission. The goals of this work, a collaboration between the Human Research Program and the ISS Program, are to inform the design of systems for more autonomous crew operations and provide a platform for research on crew autonomy for future deep space missions. Our second year of the research effort have included new insights on the crew self-scheduling sessions performed by the crew through use on the HERA (Human Exploration Research Analog) and NEEMO (NASA Extreme Environment Mission Operations) analogs. Use on the NEEMO analog involved two self-scheduling strategies where the crew planned and executed two days of EVAs (Extra-Vehicular Activities). On HERA year two represented the first HERA campaign where we were able to perform research tasks. This involved selected flexible activities that the crew could schedule, mock timelines where the crew completed more complex planning exercises, usability evaluation of the crew self-scheduling features, and more insights into the limit of plan complexity that the crew

  11. Counting, Enumerating and Sampling of Execution Plans in a Cost-Based Query Optimizer

    NARCIS (Netherlands)

    F. Waas; C.A. Galindo-Legaria

    2000-01-01

    textabstractTesting an SQL database system by running large sets of deterministic or stochastic SQL statements is common practice in commercial database development. However, code defects often remain undetected as the query optimizer's choice of an execution plan is not only depending on the query

  12. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  13. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  14. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  15. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    International Nuclear Information System (INIS)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan

  16. Upgrading Planning and Executive Strategy for Reactor Protection System and Relative Equipment in Qinshan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Jiang Zuyue

    2010-01-01

    Qinshan Nuclear Power Plant (QNPP) is the first nuclear power plant in China which completed the reactor protection system (RPS) upgrading with new digital safety instrumentation and control (I and C) platform instead of original analog system. At the same time,the nuclear instrumentation system (NIS) was upgraded with the same digital I and C platform. For adapting QNPP's actual engineering situation,the upgrading planning was taken by comprehensively investigating current development and application of digital safety I and C platform in the worldwide scope and by reviewing plant's original systems operation history. The project executive strategy-QNPP's leading role with necessary overseas cooperation and internal technical supports as great as possible, was determined. Some significant factors might influence and restrict the RPS and relative equipment upgrading executive actions in an operating NPP were analyzed.Finally, the engineering feasibility was briefly assessed to recognize the anticipated issues and difficulties and to prepare the relative solutions in advance for the purpose of ensuring the RPS upgrading objectives completely realized. (authors)

  17. Regional coordination in medical emergencies and major incidents; plan, execute and teach

    Directory of Open Access Journals (Sweden)

    Hedelin Annika

    2009-07-01

    Full Text Available Abstract Background Although disasters and major incidents are difficult to predict, the results can be mitigated through planning, training and coordinated management of available resources. Following a fire in a disco in Gothenburg, causing 63 deaths and over 200 casualties, a medical disaster response centre was created. The center was given the task to coordinate risk assessments, disaster planning and training of staff within the region and on an executive level, to be the point of contact (POC with authority to act as "gold control," i.e. to take immediate strategic command over all medical resources within the region if needed. The aim of this study was to find out if the centre had achieved its tasks by analyzing its activities. Methods All details concerning alerts of the regional POC was entered a web-based log by the duty officer. The data registered in this database was analyzed during a 3-year period. Results There was an increase in number of alerts between 2006 and 2008, which resulted in 6293 activities including risk assessments and 4473 contacts with major institutions or key persons to coordinate or initiate actions. Eighty five percent of the missions were completed within 24 h. Twenty eight exercises were performed of which 4 lasted more than 24 h. The centre also offered 145 courses in disaster and emergency medicine and crisis communication. Conclusion The data presented in this study indicates that the center had achieved its primary tasks. Such regional organization with executive, planning, teaching and training responsibilities offers possibilities for planning, teaching and training disaster medicine by giving immediate feed-back based on real incidents.

  18. A Unified Approach to Model-Based Planning and Execution

    Science.gov (United States)

    Muscettola, Nicola; Dorais, Gregory A.; Fry, Chuck; Levinson, Richard; Plaunt, Christian; Norvig, Peter (Technical Monitor)

    2000-01-01

    Writing autonomous software is complex, requiring the coordination of functionally and technologically diverse software modules. System and mission engineers must rely on specialists familiar with the different software modules to translate requirements into application software. Also, each module often encodes the same requirement in different forms. The results are high costs and reduced reliability due to the difficulty of tracking discrepancies in these encodings. In this paper we describe a unified approach to planning and execution that we believe provides a unified representational and computational framework for an autonomous agent. We identify the four main components whose interplay provides the basis for the agent's autonomous behavior: the domain model, the plan database, the plan running module, and the planner modules. This representational and problem solving approach can be applied at all levels of the architecture of a complex agent, such as Remote Agent. In the rest of the paper we briefly describe the Remote Agent architecture. The new agent architecture proposed here aims at achieving the full Remote Agent functionality. We then give the fundamental ideas behind the new agent architecture and point out some implication of the structure of the architecture, mainly in the area of reactivity and interaction between reactive and deliberative decision making. We conclude with related work and current status.

  19. Episodic memory and organizational strategy in free recall in unipolar depression: the role of cognitive support and executive functions.

    Science.gov (United States)

    Taconnat, Laurence; Baudouin, Alexia; Fay, Severine; Raz, Naftali; Bouazzaoui, Badiaa; El-Hage, Wissam; Isingrini, Michel; Ergis, Anne-Marie

    2010-08-01

    Executive functioning and memory impairment have been demonstrated in adults with depression. Executive functions and memory are related, mainly when the memory tasks require controlled processes (attentional resource demanding processes)--that is, when a low cognitive support (external aid) is provided. A cross-sectional study was carried out on 45 participants: 21 with depression, and 24 healthy controls matched for age, verbal ability, education level, and anxiety score. Cognitive support was manipulated by providing a categorized word list at encoding, presented either clustered (high cognitive support) or randomized (low cognitive support) to both depressed and healthy adults. The number of words recalled was calculated, and an index of clustering was computed to assess organizational strategies. Participants were also administered cognitive tests (executive functions, cognitive speed, and categorical fluency) to explore the mediators of organizational strategies. Depressed participants had greater difficulty recalling and organizing the words, but the differences between the two groups were reduced for both measures when high cognitive support was provided at encoding. Healthy adults performed better on all cognitive tests. Statistical analyses revealed that in the depressed group, executive functions were the only variable associated with clustering and only when low cognitive support was provided. These findings support the view that the decrement in executive function due to depression may lead to impairment in organization when this mnemonic strategy has to be self-initiated.

  20. 75 FR 52518 - Meeting of the Chief of Naval Operations (CNO) Executive Panel

    Science.gov (United States)

    2010-08-26

    ... strategy, plans, and policies in support of the organizing, manning, training, and equipping of Cyber... Naval Operations (CNO) Executive Panel will report on the findings and recommendations of the Cyber...

  1. Economic Security Environment and Implementation of Planning, Programming, Budgeting, Execution (PPBE) System in Georgia

    Science.gov (United States)

    2004-06-01

    Roy J. What Determines Economic Growth? Economic Review – Second Quarter 1993 [References: Barro (1991); Mankiw , Romer, and Well (1992); De Long...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA THESIS Approved for public release: distribution unlimited ECONOMIC SECURITY...DATES COVERED Master’s Thesis 4. TITLE AND SUBTITLE: Economic Security Environment and Implementation of Planning, Programming, Budgeting, Execution

  2. Do Children's Executive Functions Account for Associations Between Early Autonomy-Supportive Parenting and Achievement Through High School?

    Science.gov (United States)

    Bindman, Samantha W; Pomerantz, Eva M; Roisman, Glenn I

    2015-08-01

    This study evaluated whether the positive association between early autonomy-supportive parenting and children's subsequent achievement is mediated by children's executive functions. Using observations of mothers' parenting from the NICHD Study of Early Child Care and Youth Development ( N = 1,306), analyses revealed that mothers' autonomy support over the first 3 years of life predicted enhanced executive functions (i.e., inhibition, delay of gratification, and sustained attention) during the year prior to kindergarten and academic achievement in elementary and high school even when mothers' warmth and cognitive stimulation, as well as other factors (e.g., children's early general cognitive skills and mothers' educational attainment) were covaried. Mediation analyses demonstrated that over and above other attributes (e.g., temperament), children's executive functions partially accounted for the association between early autonomy-supportive parenting and children's subsequent achievement.

  3. 78 FR 28243 - Senior Executive Service; Performance Review Board; Members

    Science.gov (United States)

    2013-05-14

    ... NATIONAL CAPITAL PLANNING COMMISSION Senior Executive Service; Performance Review Board; Members AGENCY: National Capital Planning Commission. ACTION: Notice of Members of Senior Executive Service... Senior Executive Service. The PRB established for the National Capital Planning Commission also makes...

  4. 76 FR 29013 - Senior Executive Service; Performance Review Board; Members

    Science.gov (United States)

    2011-05-19

    ... NATIONAL CAPITAL PLANNING COMMISSION Senior Executive Service; Performance Review Board; Members AGENCY: National Capital Planning Commission. ACTION: Notice of Members of Senior Executive Service... Senior Executive Service. The PRB established for the National Capital Planning Commission also makes...

  5. Support for the Logical Execution Time Model on a Time-predictable Multicore Processor

    DEFF Research Database (Denmark)

    Kluge, Florian; Schoeberl, Martin; Ungerer, Theo

    2016-01-01

    The logical execution time (LET) model increases the compositionality of real-time task sets. Removal or addition of tasks does not influence the communication behavior of other tasks. In this work, we extend a multicore operating system running on a time-predictable multicore processor to support...... the LET model. For communication between tasks we use message passing on a time-predictable network-on-chip to avoid the bottleneck of shared memory. We report our experiences and present results on the costs in terms of memory and execution time....

  6. Geological considerations and constraints in planning and executing horizontal well prospects : two case studies from the Saudi Arabia

    Energy Technology Data Exchange (ETDEWEB)

    Nwabor, D. [Schlumberger Oilfield Services (Saudi Arabia); Al-Fawwaz, A.; Hassani, S. [Saudi Aramco, Dhahran (Saudi Arabia)

    2006-07-01

    This paper discussed the challenges facing horizontal well drilling with particular reference to the limited success rates of 2 wells that were initially planned and drilled geometrically according to integrated geological and seismic data. The limited success was due partly to drilling to target without considering the key subsurface risks and uncertainties at the execution stages of the wells. Two case studies from these fields were presented in an effort to highlight important geological issues that must be considered when planning and executing horizontal wells. While the wells were being drilled, geological decisions were taken based on seismic data, geological modelling and assessing offset well log responses. The continuous use of real-time data during well drilling contributed to the achievement of the wells' objectives. This approach eliminated all the initial assumptions from seismic data. During the planning stages, many target surfaces such as faults, horizons and unconformities were created from a 3 dimensional grid. Each well was geologically steered in the execution stages by comparing what was seen while drilling with what was initially proposed at the planning stages. As drilling progressed, geological issues such as structural, stratigraphic, reservoir fluid contact and surveying uncertainties were considered. In most instances, the geological objectives of the studied wells were met, thereby improving production, increasing net pay and return on investment. It was concluded that the experience from this work can be applied to oilfields anywhere in the world.

  7. Laredo District Coahuila/Nuevo Leon/Tamaulipas border master plan : executive summary.

    Science.gov (United States)

    2012-06-01

    Border Master Plans, as defined and supported by the U.S./Mexico Joint Working : Committee on Transportation Planning and Programming, the Federal Highway Administration, : and the U.S. Department of State, are comprehensive long range plans to inven...

  8. [Study of the occupational stress norm and it's application for the executive group and administrative support group].

    Science.gov (United States)

    Yang, Xin-wei; Wang, Zhi-ming; Jin, Tai-yi; Lan, Ya-jia

    2006-07-01

    A study of the occupational stress norm and it's application for the executive group and administrative support group. In this study, cross-sectional study method is used, and a synthetic way of sorting and randomized sampling is adopted to deal with research targets (263 executive group, 569 administrative support group). Descriptive statistics for OSI-R scale scores for the executive group, administrative support group were modulated. Scale raw score to T-score conversion tables derived from the OSI-R normative sample for executive group, administrative support group were established. OSI-R profile from for executive group, administrative support group were established. For the ORQ and PSQ scales, scores at or above 70 indicate a strong levels of maladaptive stress and strain. Score inthe range of 60 to 69 suggest middle levels of maladaptive stress and strain. Score in the range of 40 to 59 indicate normal levels of stress and strain. Score below 40 indicate a relative absence of occupational stress and strain. For the PRQ scales, score below 30 indicate a significant lack of coping resources. Score in the range of 30 to 39 suggest middle deficits in coping resources. Score in the range of 40 to 59 indicate average coping resources. Scores at or above 60 indicate a strong levels of coping resources. Based on occupational Stress norm, raw score to T-score conversion tables, OSI-R profile form and classification criterion, we could estimate the level of occupation stress, stressor, strain and coping resources in different occupation. In addition, we combined subjective and objective environment match model of occupational stress. The various individual and organizational intervention measures should be taken to reduce the occupational stress and to increase coping so as to improve the work ability.

  9. Critical human-factors issues in nuclear-power regulation and a recommended comprehensive human-factors long-range plan. Executive summary

    International Nuclear Information System (INIS)

    Hopkins, C.O.; Snyder, H.L.; Price, H.E.; Hornick, R.J.; Mackie, R.R.; Smillie, R.J.; Sugarman, R.C.

    1982-08-01

    This comprehensive long-range human factors plan for nuclear reactor regulation was developed by a Study Group of the Human Factors Society, Inc. This Study Group was selected by the Executive Council of the Society to provide a balanced, experienced human factors perspective to the applications of human factors scientific and engineering knowledge to nuclear power generation. The report is presented in three volumes. Volume 1 contains an Executive Summary of the 18-month effort and its conclusions. Volume 2 summarizes all known nuclear-related human factors activities, evaluates these activities wherever adequate information is available, and describes the recommended long-range (10-year) plan for human factors in regulation. Volume 3 elaborates upon each of the human factors issues and areas of recommended human factors involvement contained in the plan, and discusses the logic that led to the recommendations

  10. Planning for transit-supportive development : a practitioner's guide. Section 4 : corridor planning and transit-supportive development.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  11. Planning for transit-supportive development : a practitioner's guide. Section 5 : local planning and transit-supportive development.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  12. Planning for transit-supportive development : a practitioner's guide. Section 2 : general transit-supportive development planning topics.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  13. Everyday functioning of people with Parkinson's disease and impairments in executive function: a qualitative investigation.

    Science.gov (United States)

    Kudlicka, Aleksandra; Hindle, John V; Spencer, Laura E; Clare, Linda

    2017-06-09

    Executive function is the key area of cognitive impairment in Parkinson's disease. This study investigated how cognitive difficulties impact on everyday life of people with Parkinson's disease and their carers, and whether they explicitly mention executive-type difficulties. Semistructured interviews with 11 people with Parkinson's disease and six carers were analyzed thematically. People with Parkinson's disease performed within the normal range on cognitive screening tests, but all had abnormal scores on tests of executive function. Despite relatively mild executive deficits and no global cognitive impairment, participants described executive-type difficulties as well as a range of problems in other cognitive domains, such as memory, processing speed and apathy. Cognitive difficulties had a far-reaching impact on everyday life and their significance depended on personal circumstances, such as the level of responsibilities of the person with Parkinson's disease and the extent of available support. By presenting subjective accounts of living with Parkinson's disease and cognitive difficulties, this study improves our understanding of how the observed level of cognitive impairment translates into everyday functioning. The study results have implications for recognizing cognitive difficulties and for planning support for people with Parkinson's disease and their families, and can help identify ways of promoting effective self-management. Implications for rehabilitation Treatment of Parkinson's disease tends to focus on the movement disorder, meaning that cognitive difficulties and their impact can be overlooked. Participants in this study had only relatively mild executive deficits but described a range of cognitive problems, including executive-type difficulties. Cognitive difficulties have an emotional impact and can cause a range of challenges in everyday life, adding to the burden of physical symptoms of Parkinson's disease. Results of this study provide insights

  14. Cognitive profile in Duchenne muscular dystrophy boys without intellectual disability: The role of executive functions.

    Science.gov (United States)

    Battini, R; Chieffo, D; Bulgheroni, S; Piccini, G; Pecini, C; Lucibello, S; Lenzi, S; Moriconi, F; Pane, M; Astrea, G; Baranello, G; Alfieri, P; Vicari, S; Riva, D; Cioni, G; Mercuri, E

    2018-02-01

    The aim of our prospective observational study was to assess profiles of cognitive function and a possible impairment of executive functions in a cohort of boys with Duchenne muscular dystrophy without intellectual and behavior disability. Forty Duchenne boys (range of age: 6 years to 11 years and 6 months) were assessed by Wechsler Intelligence scale and battery of tests including tasks assessing working memory and executive functions (inhibition and switching, problem solving and planning). In our cohort some aspects of cognitive function were often impaired. These included multitasking, problem solving, inhibition and working memory necessary to plan and direct goal oriented behavior. Our results support the suggestion that aspects of cognitive function could be impaired even in boys without intellectual disability and support the hypothesis that executive functions may play an important role in specific aspects of cognitive impairment in Duchenne muscular dystrophy. Copyright © 2017 Elsevier B.V. All rights reserved.

  15. An investigation of the neural circuits underlying reaching and reach-to-grasp movements: from planning to execution.

    Directory of Open Access Journals (Sweden)

    Chiara eBegliomini

    2014-09-01

    Full Text Available Experimental evidence suggests the existence of a sophisticated brain circuit specifically dedicated to reach-to-grasp planning and execution, both in human and non human primates (Castiello, 2005. Studies accomplished by means of neuroimaging techniques suggest the hypothesis of a dichotomy between a reach-to-grasp circuit, involving the intraparietal area (AIP, the dorsal and ventral premotor cortices (PMd and PMv - Castiello and Begliomini, 2008; Filimon, 2010 and a reaching circuit involving the medial intraparietal area (mIP and the Superior Parieto-Occipital Cortex (SPOC (Culham et al., 2006. However, the time course characterizing the involvement of these regions during the planning and execution of these two types of movements has yet to be delineated. A functional magnetic resonance imaging (fMRI study has been conducted, including reach-to grasp and reaching only movements, performed towards either a small or a large stimulus, and Finite Impulse Response model (FIR - Henson, 2003 was adopted to monitor activation patterns from stimulus onset for a time window of 10 seconds duration. Data analysis focused on brain regions belonging either to the reaching or to the grasping network, as suggested by Castiello & Begliomini (2008.Results suggest that reaching and grasping movements planning and execution might share a common brain network, providing further confirmation to the idea that the neural underpinnings of reaching and grasping may overlap in both spatial and temporal terms (Verhagen et al., 2013.

  16. A Critical Examination of Senior Executive Leadership Succession Planning and Management with Implications for Underrepresented Minorities

    Science.gov (United States)

    Jackson, LeKeisha D.

    2017-01-01

    Guided by the research questions, this study utilized a sequential explanatory mixed methods research design to examine senior executive leadership succession planning at four-year, predominately white, doctoral universities in the state of Georgia. Utilizing the Representative Bureaucracy theory and the Mateso SPM conceptual model, this study…

  17. Body iron is associated with cognitive executive planning function in college women.

    Science.gov (United States)

    Blanton, Cynthia A; Green, Michael W; Kretsch, Mary J

    2013-03-14

    Evidence of the relationship between altered cognitive function and depleted Fe status is accumulating in women of reproductive age but the degree of Fe deficiency associated with negative neuropsychological outcomes needs to be delineated. Data are limited regarding this relationship in university women in whom optimal cognitive function is critical to academic success. The aim of the present study was to examine the relationship between body Fe, in the absence of Fe-deficiency anaemia, and neuropsychological function in young college women. Healthy, non-anaemic undergraduate women (n 42) provided a blood sample and completed a standardised cognitive test battery consisting of one manual (Tower of London (TOL), a measure of central executive function) and five computerised (Bakan vigilance task, mental rotation, simple reaction time, immediate word recall and two-finger tapping) tasks. Women's body Fe ranged from - 4·2 to 8·1 mg/kg. General linear model ANOVA revealed a significant effect of body Fe on TOL planning time (P= 0·002). Spearman's correlation coefficients showed a significant inverse relationship between body Fe and TOL planning time for move categories 4 (r - 0·39, P= 0·01) and 5 (r - 0·47, P= 0·002). Performance on the computerised cognitive tasks was not affected by body Fe level. These findings suggest that Fe status in the absence of anaemia is positively associated with central executive function in otherwise healthy college women.

  18. Inter-Organisational Coordination in Ramp-Up Execution

    DEFF Research Database (Denmark)

    Christensen, Irene; Karlsson, Christer

    the degree of fragmentation in the process planning and execution. Resource dependence theory (RDT) is used as central explanatory framework for inter-organisational interdependencies formation throughout the planning and execution of the ramp-up activities and milestones. This study aims at exploring inter...

  19. An expert system for a local planning environment

    NARCIS (Netherlands)

    Meester, G.J.; Meester, G.J.

    1993-01-01

    In this paper, we discuss the design of an Expert System (ES) that supports decision making in a Local Planning System (LPS) environment. The LPS provides the link between a high level factory planning system (rough cut capacity planning and material coordination) and the actual execution of jobs on

  20. Simulation-based decision support for evaluating operational plans

    Directory of Open Access Journals (Sweden)

    Johan Schubert

    2015-12-01

    Full Text Available In this article, we describe simulation-based decision support techniques for evaluation of operational plans within effects-based planning. Using a decision support tool, developers of operational plans are able to evaluate thousands of alternative plans against possible courses of events and decide which of these plans are capable of achieving a desired end state. The objective of this study is to examine the potential of a decision support system that helps operational analysts understand the consequences of numerous alternative plans through simulation and evaluation. Operational plans are described in the effects-based approach to operations concept as a set of actions and effects. For each action, we examine several different alternative ways to perform the action. We use a representation where a plan consists of several actions that should be performed. Each action may be performed in one of several different alternative ways. Together these action alternatives make up all possible plan instances, which are represented as a tree of action alternatives that may be searched for the most effective sequence of alternative actions. As a test case, we use an expeditionary operation with a plan of 43 actions and several alternatives for these actions, as well as a scenario of 40 group actors. Decision support for planners is provided by several methods that analyze the impact of a plan on the 40 actors, e.g., by visualizing time series of plan performance. Detailed decision support for finding the most influential actions of a plan is presented by using sensitivity analysis and regression tree analysis. Finally, a decision maker may use the tool to determine the boundaries of an operation that it must not move beyond without risk of drastic failure. The significant contribution of this study is the presentation of an integrated approach for evaluation of operational plans.

  1. Assessing the actions of the farm managers to execute field operations at opportune times

    DEFF Research Database (Denmark)

    Edwards, Gareth Thomas Charles; Dybro, Niels; Munkholm, Lars Juhl

    2016-01-01

    Planning agricultural operations requires an understanding of when fields are ready for operations. However determining a field's readiness is a difficult process that can involve large amounts of data and an experienced farm manager. A consequence of this is that operations are often executed when...... fields are unready, or partially unready, which can compromise results incurring environmental impacts, decreased yield and increased operational costs. In order to assess timeliness of operations' execution, a new scheme is introduced to quantify the aptitude of farm managers to plan operations. Two...... parameterise the crop model. The evaluation criteria could be used to identify farm managers who require decisional support when planning operations, or as a means of promoting the use of sustainable farming practices....

  2. Vector-model-supported approach in prostate plan optimization

    International Nuclear Information System (INIS)

    Liu, Eva Sau Fan; Wu, Vincent Wing Cheung; Harris, Benjamin; Lehman, Margot; Pryor, David; Chan, Lawrence Wing Chi

    2017-01-01

    Lengthy time consumed in traditional manual plan optimization can limit the use of step-and-shoot intensity-modulated radiotherapy/volumetric-modulated radiotherapy (S&S IMRT/VMAT). A vector model base, retrieving similar radiotherapy cases, was developed with respect to the structural and physiologic features extracted from the Digital Imaging and Communications in Medicine (DICOM) files. Planning parameters were retrieved from the selected similar reference case and applied to the test case to bypass the gradual adjustment of planning parameters. Therefore, the planning time spent on the traditional trial-and-error manual optimization approach in the beginning of optimization could be reduced. Each S&S IMRT/VMAT prostate reference database comprised 100 previously treated cases. Prostate cases were replanned with both traditional optimization and vector-model-supported optimization based on the oncologists' clinical dose prescriptions. A total of 360 plans, which consisted of 30 cases of S&S IMRT, 30 cases of 1-arc VMAT, and 30 cases of 2-arc VMAT plans including first optimization and final optimization with/without vector-model-supported optimization, were compared using the 2-sided t-test and paired Wilcoxon signed rank test, with a significance level of 0.05 and a false discovery rate of less than 0.05. For S&S IMRT, 1-arc VMAT, and 2-arc VMAT prostate plans, there was a significant reduction in the planning time and iteration with vector-model-supported optimization by almost 50%. When the first optimization plans were compared, 2-arc VMAT prostate plans had better plan quality than 1-arc VMAT plans. The volume receiving 35 Gy in the femoral head for 2-arc VMAT plans was reduced with the vector-model-supported optimization compared with the traditional manual optimization approach. Otherwise, the quality of plans from both approaches was comparable. Vector-model-supported optimization was shown to offer much shortened planning time and iteration

  3. Vector-model-supported approach in prostate plan optimization

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Eva Sau Fan [Department of Radiation Oncology, Princess Alexandra Hospital, Brisbane (Australia); Department of Health Technology and Informatics, The Hong Kong Polytechnic University (Hong Kong); Wu, Vincent Wing Cheung [Department of Health Technology and Informatics, The Hong Kong Polytechnic University (Hong Kong); Harris, Benjamin [Department of Radiation Oncology, Princess Alexandra Hospital, Brisbane (Australia); Lehman, Margot; Pryor, David [Department of Radiation Oncology, Princess Alexandra Hospital, Brisbane (Australia); School of Medicine, University of Queensland (Australia); Chan, Lawrence Wing Chi, E-mail: wing.chi.chan@polyu.edu.hk [Department of Health Technology and Informatics, The Hong Kong Polytechnic University (Hong Kong)

    2017-07-01

    Lengthy time consumed in traditional manual plan optimization can limit the use of step-and-shoot intensity-modulated radiotherapy/volumetric-modulated radiotherapy (S&S IMRT/VMAT). A vector model base, retrieving similar radiotherapy cases, was developed with respect to the structural and physiologic features extracted from the Digital Imaging and Communications in Medicine (DICOM) files. Planning parameters were retrieved from the selected similar reference case and applied to the test case to bypass the gradual adjustment of planning parameters. Therefore, the planning time spent on the traditional trial-and-error manual optimization approach in the beginning of optimization could be reduced. Each S&S IMRT/VMAT prostate reference database comprised 100 previously treated cases. Prostate cases were replanned with both traditional optimization and vector-model-supported optimization based on the oncologists' clinical dose prescriptions. A total of 360 plans, which consisted of 30 cases of S&S IMRT, 30 cases of 1-arc VMAT, and 30 cases of 2-arc VMAT plans including first optimization and final optimization with/without vector-model-supported optimization, were compared using the 2-sided t-test and paired Wilcoxon signed rank test, with a significance level of 0.05 and a false discovery rate of less than 0.05. For S&S IMRT, 1-arc VMAT, and 2-arc VMAT prostate plans, there was a significant reduction in the planning time and iteration with vector-model-supported optimization by almost 50%. When the first optimization plans were compared, 2-arc VMAT prostate plans had better plan quality than 1-arc VMAT plans. The volume receiving 35 Gy in the femoral head for 2-arc VMAT plans was reduced with the vector-model-supported optimization compared with the traditional manual optimization approach. Otherwise, the quality of plans from both approaches was comparable. Vector-model-supported optimization was shown to offer much shortened planning time and iteration

  4. Embedding Temporal Constraints For Coordinated Execution in Habitat Automation

    Science.gov (United States)

    Morris, Paul; Schwabacher, Mark; Dalal, Michael; Fry, Charles

    2013-01-01

    Future NASA plans call for long-duration deep space missions with human crews. Because of light-time delay and other considerations, increased autonomy will be needed. This will necessitate integration of tools in such areas as anomaly detection, diagnosis, planning, and execution. In this paper we investigate an approach that integrates planning and execution by embedding planner-derived temporal constraints in an execution procedure. To avoid the need for propagation, we convert the temporal constraints to dispatchable form. We handle some uncertainty in the durations without it affecting the execution; larger variations may cause activities to be skipped.

  5. Executive dysfunction among children with reading comprehension deficits.

    Science.gov (United States)

    Locascio, Gianna; Mahone, E Mark; Eason, Sarah H; Cutting, Laurie E

    2010-01-01

    Emerging research supports the contribution of executive function (EF) to reading comprehension; however, a unique pattern has not been established for children who demonstrate comprehension difficulties despite average word recognition ability (specific reading comprehension deficit; S-RCD). To identify particular EF components on which children with S-RCD struggle, a range of EF skills was compared among 86 children, ages 10 to 14, grouped by word reading and comprehension abilities: 24 average readers, 44 with word recognition deficits (WRD), and 18 S-RCD. An exploratory principal components analysis of EF tests identified three latent factors, used in subsequent group comparisons: Planning/ Spatial Working Memory, Verbal Working Memory, and Response Inhibition. The WRD group exhibited deficits (relative to controls) on Verbal Working Memory and Inhibition factors; S-RCD children performed more poorly than controls on the Planning factor. Further analyses suggested the WRD group's poor performance on EF factors was a by-product of core deficits linked to WRD (after controlling for phonological processing, this group no longer showed EF deficits). In contrast, the S-RCD group's poor performance on the planning component remained significant after controlling for phonological processing. Findings suggest reading comprehension difficulties are linked to executive dysfunction; in particular, poor strategic planning/organizing may lead to reading comprehension problems.

  6. Intelligence Campaign Planning: An Opportunity for the Army in Defense Intelligence Synchronization

    National Research Council Canada - National Science Library

    McAninch, Kevin A

    2007-01-01

    ...) Intelligence Community (IC) implementation and execution of Intelligence Campaign Planning (ICP). ICP is emerging as a new procedure for the DoD IC to centrally plan ISR Synchronization in support of regional combatant commander operation plans...

  7. Computer network that assists in the planning, execution and evaluation of in-reactor experiments

    International Nuclear Information System (INIS)

    Bauer, T.H.; Froehle, P.H.; August, C.; Baldwin, R.D.; Johanson, E.W.; Kraimer, M.R.; Simms, R.; Klickman, A.E.

    1985-01-01

    For over 20 years complex, in-reactor experiments have been performed at Argonne National Laboratory (ANL) to investigate the performance of nuclear reactor fuel and to support the development of large computer codes that address questions of reactor safety in full-scale plants. Not only are computer codes an important end-product of the research, but computer analysis is also involved intimately at most stages of experiment planning, data reduction, and evaluation. For instance, many experiments are of sufficiently long duration or, if they are of brief duration, occur in such a purposeful sequence that need for speedy availability of on-line data is paramount. This is made possible most efficiently by computer assisted displays and evaluation. A purposeful linking of main-frame, mini, and micro computers has been effected over the past eight years which greatly enhances the speed with which experimental data are reduced to useful forms and applied to the relevant technological issues. This greater efficiency in data management led also to improvements in the planning and execution of subsequent experiments. Raw data from experiments performed at INEL is stored directly on disk and tape with the aid of minicomputers. Either during or shortly after an experiment, data may be transferred, via a direct link, to the Illinois offices of ANL where the data base is stored on a minicomputer system. This Idaho-to-Illinois link has both enhanced experiment performance and allowed rapid dissemination of results

  8. 40 CFR 68.155 - Executive summary.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Executive summary. 68.155 Section 68...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.155 Executive summary. The owner or operator shall provide in the RMP an executive summary that includes a brief description of the following...

  9. Planning and delivering high doses to targets surrounding the spinal cord at the lower neck and upper mediastinal levels: static beam-segmentation technique executed with a multileaf collimator

    International Nuclear Information System (INIS)

    Neve, W. de; Wagter, C. de; Jaeger, K. de; Thienpont, M.; Colle, C.; Derycke, S.; Schelfhout, J.

    1996-01-01

    Background and purpose. It remains a technical challenge to limit the dose to the spinal cord below tolerance if, in head and neck or thyroid cancer, the planning target volume reaches to a level below the shoulders. In order to avoid these dose limitations, we developed a standard plan involving Beam Intensity Modulation (BIM) executed by a static technique of beam segmentation. In this standard plan, many machine parameters (gantry angles, couch position, relative beam and segment weights) as well as the beam segmentation rules were identical for all patients. Materials and methods. The standard plan involved: the use of static beams with a single isocenter; BIM by field segmentation executable with a standard Philips multileaf collimator; virtual simulation and dose computation on a general 3D-planning system (Sherouse's GRATIS[reg]); heuristic computation of segment intensities and optimization (improving the dose distribution and reducing the execution time) by human intelligence. The standard plan used 20 segments spread over 8 gantry angles plus 2 non-segmented wedged beams (2 gantry angles). Results. The dose that could be achieved at the lowest target voxel, without exceeding tolerance of the spinal cord (50 Gy at highest voxel) was 70-80 Gy. The in-target 3D dose-inhomogeneity was ∼25%. The shortest time of execution of a treatment (22 segments) on a patient (unpublished) was 25 min. Conclusions. A heuristic model has been developed and investigated to obtain a 3D concave dose distribution applicable to irradiate targets in the lower neck and upper mediastinal regions. The technique spares efficiently the spinal cord and allows the delivery of higher target doses than with conventional techniques. It can be planned as a standard plan using conventional 3D-planning technology. The routine clinical implementation is performed with commercially available equipment, however, at the expense of extended execution times

  10. Longitudinal Analysis of Music Education on Executive Functions in Primary School Children

    Science.gov (United States)

    Jaschke, Artur C.; Honing, Henkjan; Scherder, Erik J. A.

    2018-01-01

    Background: Research on the effects of music education on cognitive abilities has generated increasing interest across the scientific community. Nonetheless, longitudinal studies investigating the effects of structured music education on cognitive sub-functions are still rare. Prime candidates for investigating a relationship between academic achievement and music education appear to be executive functions such as planning, working memory, and inhibition. Methods: One hundred and forty-seven primary school children, Mage = 6.4 years, SD = 0.65 were followed for 2.5 years. Participants were randomized into four groups: two music intervention groups, one active visual arts group, and a no arts control group. Neuropsychological tests assessed verbal intelligence and executive functions. Additionally, a national pupil monitor provided data on academic performance. Results: Children in the visual arts group perform better on visuospatial memory tasks as compared to the three other conditions. However, the test scores on inhibition, planning and verbal intelligence increased significantly in the two music groups over time as compared to the visual art and no arts controls. Mediation analysis with executive functions and verbal IQ as mediator for academic performance have shown a possible far transfer effect from executive sub-function to academic performance scores. Discussion: The present results indicate a positive influence of long-term music education on cognitive abilities such as inhibition and planning. Of note, following a two-and-a-half year long visual arts program significantly improves scores on a visuospatial memory task. All results combined, this study supports a far transfer effect from music education to academic achievement mediated by executive sub-functions. PMID:29541017

  11. Longitudinal Analysis of Music Education on Executive Functions in Primary School Children.

    Science.gov (United States)

    Jaschke, Artur C; Honing, Henkjan; Scherder, Erik J A

    2018-01-01

    Background: Research on the effects of music education on cognitive abilities has generated increasing interest across the scientific community. Nonetheless, longitudinal studies investigating the effects of structured music education on cognitive sub-functions are still rare. Prime candidates for investigating a relationship between academic achievement and music education appear to be executive functions such as planning, working memory, and inhibition. Methods: One hundred and forty-seven primary school children, M age = 6.4 years, SD = 0.65 were followed for 2.5 years. Participants were randomized into four groups: two music intervention groups, one active visual arts group, and a no arts control group. Neuropsychological tests assessed verbal intelligence and executive functions. Additionally, a national pupil monitor provided data on academic performance. Results: Children in the visual arts group perform better on visuospatial memory tasks as compared to the three other conditions. However, the test scores on inhibition, planning and verbal intelligence increased significantly in the two music groups over time as compared to the visual art and no arts controls. Mediation analysis with executive functions and verbal IQ as mediator for academic performance have shown a possible far transfer effect from executive sub-function to academic performance scores. Discussion: The present results indicate a positive influence of long-term music education on cognitive abilities such as inhibition and planning. Of note, following a two-and-a-half year long visual arts program significantly improves scores on a visuospatial memory task. All results combined, this study supports a far transfer effect from music education to academic achievement mediated by executive sub-functions.

  12. A Hardware-Supported Algorithm for Self-Managed and Choreographed Task Execution in Sensor Networks

    Directory of Open Access Journals (Sweden)

    Borja Bordel

    2018-03-01

    Full Text Available Nowadays, sensor networks are composed of a great number of tiny resource-constraint nodes, whose management is increasingly more complex. In fact, although collaborative or choreographic task execution schemes are which fit in the most perfect way with the nature of sensor networks, they are rarely implemented because of the high resource consumption of these algorithms (especially if networks include many resource-constrained devices. On the contrary, hierarchical networks are usually designed, in whose cusp it is included a heavy orchestrator with a remarkable processing power, being able to implement any necessary management solution. However, although this orchestration approach solves most practical management problems of sensor networks, a great amount of the operation time is wasted while nodes request the orchestrator to address a conflict and they obtain the required instructions to operate. Therefore, in this paper it is proposed a new mechanism for self-managed and choreographed task execution in sensor networks. The proposed solution considers only a lightweight gateway instead of traditional heavy orchestrators and a hardware-supported algorithm, which consume a negligible amount of resources in sensor nodes. The gateway avoids the congestion of the entire sensor network and the hardware-supported algorithm enables a choreographed task execution scheme, so no particular node is overloaded. The performance of the proposed solution is evaluated through numerical and electronic ModelSim-based simulations.

  13. A model for effective planning of SME support services.

    Science.gov (United States)

    Rakićević, Zoran; Omerbegović-Bijelović, Jasmina; Lečić-Cvetković, Danica

    2016-02-01

    This paper presents a model for effective planning of support services for small and medium-sized enterprises (SMEs). The idea is to scrutinize and measure the suitability of support services in order to give recommendations for the improvement of a support planning process. We examined the applied support services and matched them with the problems and needs of SMEs, based on the survey conducted in 2013 on a sample of 336 SMEs in Serbia. We defined and analysed the five research questions that refer to support services, their consistency with the SMEs' problems and needs, and the relation between the given support and SMEs' success. The survey results have shown a statistically significant connection between them. Based on this result, we proposed an eight-phase model as a method for the improvement of support service planning for SMEs. This model helps SMEs to plan better their requirements in terms of support; government and administration bodies at all levels and organizations that provide support services to understand better SMEs' problems and needs for support. Copyright © 2015 Elsevier Ltd. All rights reserved.

  14. The procedure execution manager and its application to Advanced Photon Source operation

    International Nuclear Information System (INIS)

    Borland, M.

    1997-01-01

    The Procedure Execution Manager (PEM) combines a complete scripting environment for coding accelerator operation procedures with a manager application for executing and monitoring the procedures. PEM is based on Tcl/Tk, a supporting widget library, and the dp-tcl extension for distributed processing. The scripting environment provides support for distributed, parallel execution of procedures along with join and abort operations. Nesting of procedures is supported, permitting the same code to run as a top-level procedure under operator control or as a subroutine under control of another procedure. The manager application allows an operator to execute one or more procedures in automatic, semi-automatic, or manual modes. It also provides a standard way for operators to interact with procedures. A number of successful applications of PEM to accelerator operations have been made to date. These include start-up, shutdown, and other control of the positron accumulator ring (PAR), low-energy transport (LET) lines, and the booster rf systems. The PAR/LET procedures make nested use of PEM's ability to run parallel procedures. There are also a number of procedures to guide and assist tune-up operations, to make accelerator physics measurements, and to diagnose equipment. Because of the success of the existing procedures, expanded use of PEM is planned

  15. Teachers as Air Traffic Controllers: Helping Adolescents Navigate the Unfriendly Skies of Executive Functioning

    Science.gov (United States)

    Hodgkinson, Todd; Parks, Stephanie

    2016-01-01

    The purpose of this article is to familiarize teachers with the concept of executive functioning and to provide them with a collection of strategies that they can use to help support middle and high school students with planning, organization, task-initiation, and impulse control.

  16. Walking execution is not affected by divided attention in patients with multiple sclerosis with no disability, but there is a motor planning impairment.

    Science.gov (United States)

    Nogueira, Leandro Alberto Calazans; Santos, Luciano Teixeira Dos; Sabino, Pollyane Galinari; Alvarenga, Regina Maria Papais; Thuler, Luiz Claudio Santos

    2013-08-01

    We analysed the cognitive influence on walking in multiple sclerosis (MS) patients, in the absence of clinical disability. A case-control study was conducted with 12 MS patients with no disability and 12 matched healthy controls. Subjects were referred for completion a timed walk test of 10 m and a 3D-kinematic analysis. Participants were instructed to walk at a comfortable speed in a dual-task (arithmetic task) condition, and motor planning was measured by mental chronometry. Scores of walking speed and cadence showed no statistically significant differences between the groups in the three conditions. The dual-task condition showed an increase in the double support duration in both groups. Motor imagery analysis showed statistically significant differences between real and imagined walking in patients. MS patients with no disability did not show any influence of divided attention on walking execution. However, motor planning was overestimated as compared with real walking.

  17. Ecological support for rural land-use planning.

    Science.gov (United States)

    David M. Theobald; Thomas Spies; Jeff Kline; Bruce Maxwell; N. T. Hobbs; Virginia H. Dale

    2005-01-01

    How can ecologists be more effective in supporting ecologically informed rural land-use planning and policy? Improved decision making about rural lands requires careful consideration of how ecological information and analyses can inform specific planning and policy needs. We provide a brief overview of rural land-use planning, including recently developed approaches to...

  18. Decision support in hierarchical planning systems: The case of procurement planning in oil refining industries

    DEFF Research Database (Denmark)

    Kallestrup, Kasper Bislev; Lynge, Lasse Hadberg; Akkerman, Renzo

    2014-01-01

    In this paper, we discuss the development of decision support systems for hierarchically structured planning approaches, such as commercially available advanced planning systems. We develop a framework to show how such a decision support system can be designed with the existing organization in mind...... and from the perspective of the organizational aspects involved. To exemplify and develop our framework, we use a case study of crude oil procurement planning in the refining industry. The results of the case study indicate an improved organizational embedding of the DSS, leading to significant savings...... in terms of planning efforts and procurement costs. In general, our framework aims to support the continuous improvement of advanced planning systems, increasing planning quality in complex supply chain settings....

  19. Evaluating the Theory of Executive Dysfunction in Autism

    Science.gov (United States)

    Hill, Elisabeth L.

    2004-01-01

    In this paper studies of executive function in autism spectrum disorder are reviewed. Executive function is an umbrella term for functions such as planning, working memory, impulse control, inhibition, and shifting set, as well as for the initiation and monitoring of action. In this review, the focus will be on planning, inhibition, shifting set,…

  20. Executive Dysfunction

    Science.gov (United States)

    Rabinovici, Gil D.; Stephens, Melanie L.; Possin, Katherine L.

    2015-01-01

    Purpose of Review: Executive functions represent a constellation of cognitive abilities that drive goal-oriented behavior and are critical to the ability to adapt to an ever-changing world. This article provides a clinically oriented approach to classifying, localizing, diagnosing, and treating disorders of executive function, which are pervasive in clinical practice. Recent Findings: Executive functions can be split into four distinct components: working memory, inhibition, set shifting, and fluency. These components may be differentially affected in individual patients and act together to guide higher-order cognitive constructs such as planning and organization. Specific bedside and neuropsychological tests can be applied to evaluate components of executive function. While dysexecutive syndromes were first described in patients with frontal lesions, intact executive functioning relies on distributed neural networks that include not only the prefrontal cortex, but also the parietal cortex, basal ganglia, thalamus, and cerebellum. Executive dysfunction arises from injury to any of these regions, their white matter connections, or neurotransmitter systems. Dysexecutive symptoms therefore occur in most neurodegenerative diseases and in many other neurologic, psychiatric, and systemic illnesses. Management approaches are patient specific and should focus on treatment of the underlying cause in parallel with maximizing patient function and safety via occupational therapy and rehabilitation. Summary: Executive dysfunction is extremely common in patients with neurologic disorders. Diagnosis and treatment hinge on familiarity with the clinical components and neuroanatomic correlates of these complex, high-order cognitive processes. PMID:26039846

  1. Metacognition and executive functioning in Elementary School

    Directory of Open Access Journals (Sweden)

    Trinidad García

    Full Text Available This study analyzes differences in metacognitive skills and executive functioning between two groups of students (10-12 years with different levels of metacognitive knowledge (high n = 50, low n = 64. Groups were established based on students' score on a test of knowledge of strategy use. Metacognitive skills were assessed by means of self-report. Students reported the frequency with which they applied these strategies during the phases of planning, execution, and evaluation of learning. Information about student executive functioning was provided by families and teachers, who completed two parallel forms of a behavior rating scale. The results indicated that: a the group with high levels of metacognitive knowledge reported using their metacognitive skills more frequently than their peers in the other group. These differences were statistically significant in the phases of planning and execution; b both family and teachers informed of better levels of executive functioning in the students with high metacognitive knowledge. Statistically significant differences were found in planning, functional memory, focus, and sustained attention. These results show the existence of an association between different levels of metacognitive knowledge, and differences in metacognitive skills and executive functions, and suggest the need to emphasize this set of variables in order to encourage students to acquire increasing levels of control over their learning process.

  2. Warhead Monitoring Planning and Execution

    Energy Technology Data Exchange (ETDEWEB)

    Nakae, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-12-05

    The Warhead Measurement Campaign is a multi-laboratory project lead by the Los Alamos National Laboratory. The project will measure several items of the US nuclear weapons stockpile with a wide range of radiation detection systems. This report provides a brief summary of those LLNL executed activities for the Warhead Measurement Campaign from FY11 through FY16. A more detailed description of all of LLNL’s activiites for the WMC will be presented in the final report of a follow-on project, , LA17-V-Wx.

  3. EXECUTIVE FUNCTIONING IN SCHIZOPHRENIA

    Directory of Open Access Journals (Sweden)

    Gricel eOrellana

    2013-06-01

    Full Text Available The executive function (EF is a set of abilities, which allows us to invoke voluntary control of our behavioral responses. These functions enable human beings to develop and carry out plans, make up analogies, obey social rules, solve problems, adapt to unexpected circumstances, do many tasks simultaneously and locate episodes in time and place. EF includes divided attention and sustained attention, working memory, set-shifting, flexibility, planning and the regulation of goal directed behavior and can be defined as a brain function underlying the human faculty to act or think not only in reaction to external events but also in relation with internal goals and states. EF is mostly associated with dorsolateral prefrontal cortex (PFC. Besides EF, PFC is involved in self-regulation of behavior, i.e. the ability to regulate behavior according to internal goals and constraints, particularly in less structured situations. Self-regulation of behavior is subtended by ventral medial /orbital PFC. Impairment of EF is one of the most commonly observed deficits in schizophrenia through the various disease stages. Impairment in tasks measuring conceptualization, planning, cognitive flexibility, verbal fluency, ability to solve complex problems and working memory occur in schizophrenia. Disorders detected by executive tests are consistent with evidence from functional neuroimaging, which have shown PFC dysfunction in patients while performing these kinds of tasks. Schizophrenics also exhibit deficit in odor identifying, decision-making and self-regulation of behavior suggesting dysfunction of the orbital PFC. However, impairment in executive tests is explained by dysfunction of prefronto-striato-thalamic, prefronto-parietal and prefronto-temporal neural networks mainly. Disorders in executive functions may be considered central facts with respect to schizophrenia and it has been suggested that negative symptoms may be explained by that executive dysfunction.

  4. Assessment of Scheduling and Plan Execution of Apollo 14 Lunar Surface Operations

    Science.gov (United States)

    Marquez, Jessica J.

    2010-01-01

    Although over forty years have passed since first landing on the Moon, there is not yet a comprehensive, quantitative assessment of Apollo extravehicular activities (EVAs). Quantitatively evaluating lunar EVAs will provide a better understanding of the challenges involved with surface operations. This first evaluation of a surface EVA centers on comparing the planned and the as-ran timeline, specifically collecting data on discrepancies between durations that were estimated versus executed. Differences were summarized by task categories in order to gain insight as to the type of surface operation activities that were most challenging. One Apollo 14 EVA was assessed utilizing the described methodology. Selected metrics and task categorizations were effective, and limitations to this process were identified.

  5. Longitudinal Analysis of Music Education on Executive Functions in Primary School Children

    Directory of Open Access Journals (Sweden)

    Artur C. Jaschke

    2018-02-01

    Full Text Available Background: Research on the effects of music education on cognitive abilities has generated increasing interest across the scientific community. Nonetheless, longitudinal studies investigating the effects of structured music education on cognitive sub-functions are still rare. Prime candidates for investigating a relationship between academic achievement and music education appear to be executive functions such as planning, working memory, and inhibition.Methods: One hundred and forty-seven primary school children, Mage = 6.4 years, SD = 0.65 were followed for 2.5 years. Participants were randomized into four groups: two music intervention groups, one active visual arts group, and a no arts control group. Neuropsychological tests assessed verbal intelligence and executive functions. Additionally, a national pupil monitor provided data on academic performance.Results: Children in the visual arts group perform better on visuospatial memory tasks as compared to the three other conditions. However, the test scores on inhibition, planning and verbal intelligence increased significantly in the two music groups over time as compared to the visual art and no arts controls. Mediation analysis with executive functions and verbal IQ as mediator for academic performance have shown a possible far transfer effect from executive sub-function to academic performance scores.Discussion: The present results indicate a positive influence of long-term music education on cognitive abilities such as inhibition and planning. Of note, following a two-and-a-half year long visual arts program significantly improves scores on a visuospatial memory task. All results combined, this study supports a far transfer effect from music education to academic achievement mediated by executive sub-functions.

  6. System of Budget Planning, Programming, Development and Execution and the Defence Resources Management Model (DRMM

    Directory of Open Access Journals (Sweden)

    Davor Čutić

    2010-07-01

    Full Text Available The system of budget planning, programming, development and execution of the Ministry of Defence of the Republic of Croatia (henceforth: the Croatian acronym SPPIIP is the basic system for the strategic management of defence resources through which an effective and rational distribution of available resources is conducted, based on the goals of national security of the Republic of Croatia. This system sets the principles of transparency and democratic management of defence resources while respecting the specificities of the defence system. The SPPIIP allows for decision making based on complete information about alternatives and the choice of the most economical and most efficient way to reach the goal. It unites the strategic plan, program and budget. It consists of four continuous, independent and interconnected phases: planning, programming, development and the execution of the budget. The processes of the phases are dynamic and cyclic. In addition to the SPPIIP, the Defence Resources Management Model (DRMM, Croatian acronym: MURO has also been developed. This is an analytic tool which serves as a decision support system in the SPPIIP. The DRMM is a complex computer model showing graph and tabular overviews in a multi-year period. The model examines three areas: the strength of the forces, expenses and defence programs. The purpose of the model is cost and strength analysis and the analysis of compromise and feasibility, i.e. how sensitive the programs are to fiscal movements in the sphere of the MoD budget in the course of a multiyear cycle, until a certain project ends. The analysis results are an easily understandable basis for decision making. The SPPIIP and the DRMM are mutually independent systems, but they complement each other well. The SPPIIP uses the DRMM in designing and resource allocation based on the goals set. The quality of the DRMM depends on the amount and quality of data in its database. The DRMM can be used as a basis for

  7. Diagnosing and Resolving Conflict Created by Strategic Plans: Where Outreach Strategies and Execution Meet at an Academic Health Center.

    Science.gov (United States)

    Edwards, Robert L; Wollner, Samuel B; Weddle, Jessica; Zembrodt, James W; Birdwhistell, Mark D

    2017-01-01

    The imperative for strategic change at academic health centers has never been stronger. Underpinning the success of strategic change is an effective process to implement a strategy. Healthcare organizations, however, often fail to execute on strategy because they do not activate the requisite capabilities and management processes. The University of Kentucky HealthCare recently defined its 2020 strategic plan to adapt to emerging market conditions. The authors outline the strategic importance of strengthening partnership networks and the initial challenges faced in executing their strategy. The findings are a case study in how one academic health center has approached strategy implementation.

  8. Assessment of executive functions in patients with obsessive compulsive disorder by NeuroVR.

    Science.gov (United States)

    La Paglia, Filippo; La Cascia, Caterina; Rizzo, Rosalinda; Riva, Giuseppe; La Barbera, Daniele

    2012-01-01

    Executive functions are often impaired in obsessive-compulsive disorder (OCD). We used a Virtual Reality version of the Multiple Errand Test (VMET) - developed dusing the free NeuroVR software (http://www.neurovr.org) - to evaluate the executive functions in daily life in 10 OCD patients and 10 controls. It is performed in a shopping setting where there are items to be bought and information to be obtained. The execution time for the whole task was higher in patients with OCD compared to controls, suggesting that patients with OCD need more time in planning than controls. The same difference was found in the partial errors during the task. Furthermore, the mean rank for and for interpretation failures is higher for controls, while the values of divided attention and the of self correction seems to be lower in controls. We think that obsessive patients tend to work with greater diligence and observance of rules than controls. In conclusion, these results provide initial support for the feasibility of VMET as assessment tool of executive functions. Specifically, the significant correlation found between the VMET and the neuropsychological battery support the ecological validity of VMET as an instrument for the evaluation of executive functions in patients with OCD.

  9. The Critical Role of the Research Community in Space Weather Planning and Execution

    Science.gov (United States)

    Robinson, Robert M.; Behnke, Richard A.; Moretto, Therese

    2018-03-01

    The explosion of interest in space weather in the last 25 years has been due to a confluence of efforts all over the globe, motivated by the recognition that events on the Sun and the consequent conditions in interplanetary space and Earth's magnetosphere, ionosphere, and thermosphere can have serious impacts on vital technological systems. The fundamental research conducted at universities, government laboratories, and in the private sector has led to tremendous improvements in the ability to forecast space weather events and predict their impacts on human technology and health. The mobilization of the research community that made this progress possible was the result of a series of actions taken by the National Science Foundation (NSF) to build a national program aimed at space weather. The path forward for space weather is to build on those successes through continued involvement of the research community and support for programs aimed at strengthening basic research and education in academia, the private sector, and government laboratories. Investments in space weather are most effective when applied at the intersection of research and applications. Thus, to achieve the goals set forth originally by the National Space Weather Program, the research community must be fully engaged in the planning, implementation, and execution of space weather activities, currently being coordinated by the Space Weather Operations, Research, and Mitigation Subcommittee under the National Science and Technology Council.

  10. SPAWAR Strategic Plan Execution Year 2017

    Science.gov (United States)

    2017-01-11

    Transitioned financial reporting capability into SPAWAR’s business intelligence environment reducing the number of siloed business intelligence solutions...level forums, we are highlighting it here for visibility within the 2017 Strategic Execution Guidance. We will continue to report progress via...and savings • Number of analytic users MILESTONES Deliver Enterprise Business Intelligence Reports - Workforce Management Report Build #2 (January

  11. Expeditionary Logistics: How the Marine Corps Supports Its Expeditionary Operations

    Science.gov (United States)

    2015-06-01

    Asset Planning at the Lowest Level .................60  5.  Improve Field Testing of All New Data Systems .............................60  C...Figure 7.  The Levels of Logistic Support. (from MCDP 4, 1997) ..................................21  Figure 8.  Case Study Methodology (Yin, 2009, p. 1...Combat Support System–Marine Corps GCE Ground Combat Element JOPES Joint Operational Planning and Execution System LCE Logistics Combat Element MAGTF

  12. A SWOT analysis of Planning Support Systems

    NARCIS (Netherlands)

    Vonk, G.; Geertman, S.; Schot, P.P.

    2007-01-01

    Insight into the strengths, weaknesses, opportunities, and threats (SWOT) of planning support systems (PSS) is fragmented between users and system developers. The lack of combined insights blocks development in the right direction and makes potential users hesitant to apply PSS in planning. This

  13. A science-based executive for autonomous planetary vehicles

    Science.gov (United States)

    Peters, S.

    2001-01-01

    If requests for scientific observations, rather than specific plans, are uplinked to an autonomous execution system on the vehicle, it would be able to adjust its execution based upon actual performance. Such a science-based executive control system had been developed and demonstrated for the Rocky7 research rover.

  14. Reconfigurable manufacturing execution system for pipe cutting

    Science.gov (United States)

    Yin, Y. H.; Xie, J. Y.

    2011-08-01

    This article presents a reconfigurable manufacturing execution system (RMES) filling the gap between enterprise resource planning and resource layer for pipe-cutting production with mass customisation and rapid adaptation to dynamic market, which consists of planning and scheduling layer and executive control layer. Starting from customer's task and process requirements, the cutting trajectories are planned under generalised mathematical model able to reconfigure in accordance with various intersecting types' joint, and all tasks are scheduled by nesting algorithm to maximise the utilisation rate of rough material. This RMES for pipe cutting has been effectively implemented in more than 100 companies.

  15. Site Support Program Plan Infrastructure Program

    International Nuclear Information System (INIS)

    1995-01-01

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site's infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford's infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition

  16. Planning Support Systems (PSS-Based Spatial Plan Alternatives and Environmental Assessment

    Directory of Open Access Journals (Sweden)

    Hee-Sun Choi

    2016-03-01

    Full Text Available Spatial planning is at the core of national land and urban development. Many countries and cities seek sustainable development through various means such as coordinated environmental planning, environmental assessment, and internalization of environmental analysis and planning. A Planning Support System (PSS is a GIS (Geographic Information System-based, spatial decision-making support system that incorporates a variety of theories and pertinent models. This study adopted the “What if?” model to design an alternative spatial plan that includes generation of predictive scenarios and is relatively easy to use. In the cities studied, we identified a total of six scenarios based on the main drivers of development—namely, population and spatial policies. Subsequently, we assessed the alternatives for their environmental impact, preparing sensitivity maps for each major environmental issue in the target area (natural ecosystem, air and microclimate, natural disasters. One projected advantage of the “What if?” model is that its digital visualization of proposed plans may improve public awareness and involvement. Furthermore, the tool is expected to be highly useful in ensuring the objectivity of quantitative analyses. However, it is necessary to develop a PSS that is both standardized and tailored to the particular needs of each area. Finally, the development of an e-governance system will be beneficial in ensuring public access to the decision making process.

  17. Developmental Changes in Executive Functioning

    Science.gov (United States)

    Lee, Kerry; Bull, Rebecca; Ho, Ringo M. H.

    2013-01-01

    Although early studies of executive functioning in children supported Miyake et al.'s (2000) three-factor model, more recent findings supported a variety of undifferentiated or two-factor structures. Using a cohort-sequential design, this study examined whether there were age-related differences in the structure of executive functioning among…

  18. Site Support Program Plan Infrastructure Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-26

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

  19. Lessons Learned for Planning and Estimating Operations Support Requirements

    Science.gov (United States)

    Newhouse, Marilyn

    2011-01-01

    Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

  20. Analysis of Logistics Support via Acquisition and Cross-Servicing Agreements and Contracted Support

    Science.gov (United States)

    2017-12-01

    Automated Tracking and Reporting System AIT Accountability , Integrity, and Transparency AO Area of Operation AT&L Acquisition, Technology, and... Accountability Office HNS Host Nation Support xvi ID Indefinite Delivery IQ Indefinite Quantity JOPES Joint Operations Planning and Execution...Three Integrative Pillars USC United States Code USMC United States Marine Corps VAT Value Added Tax xviii THIS PAGE INTENTIONALLY LEFT

  1. Collective Intelligence and Three Aspects of Planning in Organizations: A NASA Example

    Science.gov (United States)

    Billman, Dorrit; Feary, Michael

    2010-01-01

    For many complex sociotechnical systems, planning seems to require explicit coordination; certainly, in executing a plan the activities of different actors must be tightly coupled. However, distributing the needed planning information can be very burdensome and error prone, because different groups need different collections of information, updated or kept current on different time cycles. Further, the information needed to form successful plans is often highly distributed, and while feedback about the success of prior plans may exist, it may not be available to those in a position of using this to improve plans or to detect and resolve other problems in the system (Weick, 1995). Tools to support various aspects of planning have been developed, and can provide a huge benefit to the individuals working on that aspect. To be tractable, most solutions address a quite bounded slice of work, isolating it from the larger context. Prospective planning takes place over multiple, nested cycles of decision making. This builds a plan that specifies activities of different granularity. "Subplans" may specify multiple parallel activities by different groups and individuals, as well as sequential, nested actions by a single actor. Planning produces valuable, sharable, external, representations: in addition to prospective use, plans support retrospective assessment and also action in the present. Viewing planning in a larger context - both temporal and organizational -- enables noticing what one does not know and generating more systemic and effective solutions. Viewing a problem as one of collective intelligence invites thinking about the larger organizational context. Many approaches to supporting collective intelligence do not support execution of highly contingent actions, distributed across many players, and hence provide incomplete support for planning. However, CI technology maybe helpful in managing the processes of gathering information for decision making in planning

  2. Pattern of executive functioning in adolescents with epilepsy: A multimethod measurement approach.

    Science.gov (United States)

    Modi, Avani C; Vannest, Jennifer; Combs, Angela; Turnier, Luke; Wade, Shari L

    2018-03-01

    Youth with epilepsy demonstrate deficits in executive functioning (EF), the skills necessary for goal-directed behavior (e.g., problem-solving, initiating, monitoring, organization, planning, and working memory). Despite 30-50% of youth with epilepsy demonstrating EF deficits, no extant studies have utilized both performance and questionnaire-based measures to examine the pattern of EF deficits in adolescents with epilepsy. Study aims were to 1) identify the pattern of EF deficits in adolescents with epilepsy and 2) identify which assessment tools are most sensitive to EF deficits in this population (adolescents, ages 13-17, with epilepsy). An exploratory aim was to examine group differences on measures of EF by epilepsy type. Standard performance-based neuropsychological measures (Wechsler Intelligence Scale for Children - Version V or Wechsler Adult Intelligence Scale Working Memory Index-Version IV, Delis Kaplan Executive Functioning System, NIH Toolbox, Test of Everyday Attention for Children) and the Behavior Rating Inventory of Executive Functioning (BRIEF) comprised the multimethod assessment battery. Depending on the measure, 30% of adolescents with epilepsy had deficits in working memory, 17% in cognitive flexibility/problem solving, 6% in inhibition, and 18% in planning/organization. Attention was a significant problem for 15% of adolescents with epilepsy. Correlations among the various EF measures were quite poor. Across various EF domains, results indicated that adolescents with localization-related epilepsy demonstrated better EF skills compared to adolescents with unclassified epilepsy. Overall, our findings suggest that executive functioning deficits are selective and different from those observed in other neurological populations (e.g., attention deficit hyperactivity disorder (ADHD), traumatic brain injury) where problems with self-regulation (i.e., inhibition, planning/organization) are more pronounced. These findings support utilizing multiple

  3. Planning, development and experiences obtained with the execution of the Project Surata River

    International Nuclear Information System (INIS)

    Carreno, Erwin Wolff

    2004-01-01

    From May 1997 is executed the Project, Reduction of the Contamination to the small mining in the basin of the Surata River (known and abbreviated as project Surata River), which has been developed inside the mark of the technical cooperation between the governments from Colombia and Germany. The German support will culminate September 30 the 2004. After many trips for reasons of public order and for those originated in the administrative processes, it could diagnose himself the mining of Vetas and California region, it stops later on to execute works in the different facilities of benefit of minerals in dispersed form and finally to find the most significant route as contribution of the contamination reduction: to develop integral measures in each one of the units that benefit the mineral in the area. The efforts so much institutional as personnel they have been very big and the strong investments; it memorized of the lessons, and it is aspired to continue with the programming of the activities beyond October - 2004, with the support of the involved Colombian institutions. Now they know each other and they have been applied in the region, technologies environmentally clean in prosecution of gold minerals, those that in opposition of that thought of a principle, they also rebound in increment of the economic revenues of the miners

  4. Manager's assistant systems for space system planning

    Science.gov (United States)

    Bewley, William L.; Burnard, Robert; Edwards, Gary E.; Shoop, James

    1992-01-01

    This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.

  5. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    International Nuclear Information System (INIS)

    MCGRATH, G.M.

    2000-01-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration

  6. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    Energy Technology Data Exchange (ETDEWEB)

    HOLSTEIN, W.A.

    1999-08-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  7. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    Energy Technology Data Exchange (ETDEWEB)

    MCGRATH, G.M.

    2000-06-21

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  8. Single-instruction multiple-data execution

    CERN Document Server

    Hughes, Christopher J

    2015-01-01

    Having hit power limitations to even more aggressive out-of-order execution in processor cores, many architects in the past decade have turned to single-instruction-multiple-data (SIMD) execution to increase single-threaded performance. SIMD execution, or having a single instruction drive execution of an identical operation on multiple data items, was already well established as a technique to efficiently exploit data parallelism. Furthermore, support for it was already included in many commodity processors. However, in the past decade, SIMD execution has seen a dramatic increase in the set of

  9. Decision-support tools for climate change mitigation planning

    DEFF Research Database (Denmark)

    Puig, Daniel; Aparcana Robles, Sandra Roxana

    . For example, in the case of life-cycle analysis, the evaluation criterion entails that the impacts of interest are examined across the entire life-cycle of the product under study, from extraction of raw materials, to product disposal. Effectively, then, the choice of decision-support tool directs......This document describes three decision-support tools that can aid the process of planning climate change mitigation actions. The phrase ‘decision-support tools’ refers to science-based analytical procedures that facilitate the evaluation of planning options (individually or compared to alternative...... options) against a particular evaluation criterion or set of criteria. Most often decision-support tools are applied with the help of purpose-designed software packages and drawing on specialised databases.The evaluation criteria alluded to above define and characterise each decision-support tool...

  10. Exploiting Semantic Web Technologies to Develop OWL-Based Clinical Practice Guideline Execution Engines.

    Science.gov (United States)

    Jafarpour, Borna; Abidi, Samina Raza; Abidi, Syed Sibte Raza

    2016-01-01

    Computerizing paper-based CPG and then executing them can provide evidence-informed decision support to physicians at the point of care. Semantic web technologies especially web ontology language (OWL) ontologies have been profusely used to represent computerized CPG. Using semantic web reasoning capabilities to execute OWL-based computerized CPG unties them from a specific custom-built CPG execution engine and increases their shareability as any OWL reasoner and triple store can be utilized for CPG execution. However, existing semantic web reasoning-based CPG execution engines suffer from lack of ability to execute CPG with high levels of expressivity, high cognitive load of computerization of paper-based CPG and updating their computerized versions. In order to address these limitations, we have developed three CPG execution engines based on OWL 1 DL, OWL 2 DL and OWL 2 DL + semantic web rule language (SWRL). OWL 1 DL serves as the base execution engine capable of executing a wide range of CPG constructs, however for executing highly complex CPG the OWL 2 DL and OWL 2 DL + SWRL offer additional executional capabilities. We evaluated the technical performance and medical correctness of our execution engines using a range of CPG. Technical evaluations show the efficiency of our CPG execution engines in terms of CPU time and validity of the generated recommendation in comparison to existing CPG execution engines. Medical evaluations by domain experts show the validity of the CPG-mediated therapy plans in terms of relevance, safety, and ordering for a wide range of patient scenarios.

  11. Technical Support Section annual work plan for FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    Adkisson, B.P.; Allison, K.L.; Effler, R.P.; Hess, R.A.; Keeble, T.A.; Odom, S.M.; Smelcer, D.R.

    1997-12-01

    The Technical Support Section (TSS) of the Instrumentation and Controls (I and C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from, and is driven directly by, current trends in the budgets and activities of each ORNL division for which TSS provides support. Trends that will affect TSS planning during this period are reductions in the staffing levels of some R and D programs because of attrition or budget cuts. TSS does not have an annual budget to cover operating expenses incurred in providing instrument maintenance support to ORNL. Each year, TSS collects information concerning the projected funding levels of programs and facilities it supports. TSS workforce and resource projections are based on the information obtained and are weighted depending on the percentage of support provided to that division or program. Each year, TSS sets the standard hourly charge rate for the following fiscal year. The Long-Range Work Plan is based on estimates of the affects of the long-range priorities and directions of the Laboratory. Proposed new facilities and programs provide additional bases for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, reevaluation of qualifications for new hires, and identification of essential test equipment that will be needed for new work.

  12. Executive functions in persons with metabolic syndrome

    Directory of Open Access Journals (Sweden)

    Subotić Tatjana

    2016-01-01

    Full Text Available Modern man lyfestyle contributes to the increasing incidence of metabolic syndrome in the developed world. Prevalence of the metabolic syndrome in adults ranges from 20 to 25%, and it tends to increase. Each year, 3.2 million people around the world die from complications associated with this syndrome. Treatment involves cooperation of medical doctors of various specialties, but the decisive factor is patient motivation, given that the treatment requires significant lifestyle changes. Our hypothesis is that metabolic syndrome patients have reduced ability to plan, convert plan into action and effectively implement planned activities, showing signs of dysexecutive syndrome. The term executive functions comes from the English word 'executive', which also means the controlling, in neuropsychology reserved for high-level abilities that influence more basic abilities such as attention, perception, memory, thinking and speaking. The main objective of this study was to determine characteristics of executive functioning in patients with metabolic syndrome. The sample consisted of 61 subjects of both sexes, aged 20 to 60 years, divided into two groups - those with a diagnosis of metabolic syndrome and those without this diagnosis. The results suggest that people with metabolic syndrome showed significantly poorer performance in almost all indicators of executive functions, represented by Wisconsin Card Sorting Test (Wisconsin Card Sorting Test variables.

  13. Rehabilitasi Neuropsikologi Dalam Upaya Memperbaiki Defisit Executive Function (Fungsi Eksekutif Klien Gangguan Mental

    Directory of Open Access Journals (Sweden)

    Nur Fatwikiningsih

    2016-12-01

    Full Text Available Executive function is responsible for directing self behavior in order to purposive and aims such as planning, organizing, problem solving, self-monitoring skills and self regulation. This function is associated with frontal lobe (center of think. The main components of executive function are anticipation (set realistic expectations, understanding the consequences, planning (organization, execution or implementation (maintain flexibility, self-monitoring (emotional control, error recognition. Dysfunction executive (deficit of executive functions is one cause of disability in the client's mental disorders so that clients of mental disorders commonly have difficulty in performing  activities of complex psychological like behavior of complex, purposeful, targeted and selective attention, decision-making, judgment, selection, planning, and flexibility. Neuropsychological rehabilitation efforts can be used to improve executive function (executive function thus will significantly improve emotional health, social functioning, and independent skill.  The rehabilitation program consists of a variety of techniques that include Cognitive Adaptation Training (CAT, verbalization, goal setting and cognitive remediation.

  14. Data Visualization in Support of Executive Decision Making

    Directory of Open Access Journals (Sweden)

    Jeanne Moore

    2017-04-01

    Full Text Available Aim/Purpose: This journal paper seeks to understand historical aspects of data management, leading to the current data issues faced by organizational executives in relation to big data and how best to present the information to circumvent big data challenges for executive strategic decision making. Background:\tThis journal paper seeks to understand what executives value in data visualization, based on the literature published from prior data studies. Methodology: The qualitative methodology was used to understand the sentiments of executives and data analysts using semi-structured interview techniques. Contribution: The preliminary findings can provide practical knowledge for data visualization designers, but can also provide academics with knowledge to reflect on and use, specifically in relation to information systems (IS that integrate human experience with technology in more valuable and productive ways. Findings: Preliminary results from interviews with executives and data analysts point to the relevance of understanding and effectively presenting the data source and the data journey, using the right data visualization technology to fit the nature of the data, creating an intuitive platform which enables collaboration and newness, the data presenter’s ability to convey the data message and the alignment of the visualization to core the objectives as key criteria to be applied for successful data visualizations Recommendations for Practitioners: Practitioners, specifically data analysts, should consider the results highlighted in the findings and adopt such recommendations when presenting data visualizations. These include data and premise understanding, ensuring alignment to the executive’s objective, possessing the ability to convey messages succinctly and clearly to the audience, having knowledge of the domain to answer questions effectively, and using the right technology to convey the message. Recommendation for Researchers: The

  15. The implementation of the Plan Esperanza and response to the imPACT Review.

    Science.gov (United States)

    Vidaurre, Tatiana; Santos, Carlos; Gómez, Henry; Sarria, Gustavo; Amorin, Edgar; López, Marga; Regalado, Roxana; Manrique, Javier; Tarco, Duniska; Ayestas, Carlos; Calderón, Mónica; Mas, Luis; Neciosup, Silvia; Salazar, Miriam; Chávez, Juan Carlos; Ubillus, Milward; Limache, Abel; Ubillus, José Carlos; Navarro, Jeannie; Sarwal, Kavita; Sutcliffe, Simon; Gutiérrez-Aguado, Alfonso; Silva, Marianela; Mena, Amalia; Guillén, María Eugenia; Castañeda, Carlos; Abugattas, Julio

    2017-10-01

    Following the implementation of the National Cancer Prevention and Control Results-based Budget Programme (PpR Cancer-024) in 2011, the Peruvian Government approved the Plan Esperanza-a population-based national cancer control plan-in 2012. Legislation that ensured full government-supported funding for people who were otherwise unable to access or afford care and treatment accompanied the Plan. In 2013, the Ministry of Health requested an integrated mission of the Programme of Action for Cancer Therapy (imPACT) report to strengthen cancer control in Peru. The imPACT Review, which was executed in 2014, assessed Peru's achievements in cancer control, and areas for improvement, including cancer control planning, further development of population-based cancer registration, increased prevention, early diagnosis, treatment and palliative care, and the engagement and participation of civil society in the health-care system. This Series paper gives a brief history of the development of the Plan Esperanza, describes the innovative funding model that supports it, and summarises how funds are disseminated on the basis of disease, geography, and demographics. An overview of the imPACT Review, and the government's response in the context of the Plan Esperanza, is provided. The development and execution of the Plan Esperanza and the execution of and response to the imPACT Review demonstrates the Peruvian Government's commitment to fighting cancer across the country, including in remote and urban areas. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. Diagnosis of plan structure Violations

    NARCIS (Netherlands)

    Roos, Nico

    2007-01-01

    Failures in plan execution can be attributed to errors in the execution of plan steps or violations of the plan structure. The structure of a plan prescribes which actions have to be performed and which precedence constraints between them have to be respected. Especially in multi-agent environments

  17. A competence executive coaching model

    Directory of Open Access Journals (Sweden)

    Pieter Koortzen

    2010-07-01

    Research purpose: The purpose of this article is to address the training and development needs of these consulting psychologists by presenting a competence executive coaching model for the planning, implementation and evaluation of executive coaching interventions. Research design, approach and method: The study was conducted while one of the authors was involved in teaching doctoral students in consulting psychology and executive coaching, specifically in the USA. The approach involved a literature review of executive coaching models and a qualitative study using focus groups to develop and evaluate the competence executive coaching model. Main findings: The literature review provided scant evidence of competence executive coaching models and there seems to be a specific need for this in the training of coaches in South Africa. Hence the model that was developed is an attempt to provide trainers with a structured model for the training of coaches. Contribution/value-add: The uniqueness of this competence model is not only described in terms of the six distinct coaching intervention phases, but also the competencies required in each.

  18. Strategic plan creates a blueprint for budgeting.

    Science.gov (United States)

    Cook, D

    1990-05-01

    Effective healthcare organizations develop budgets that reflect and support a strategic plan. Senior managers set a framework that expresses the hospital's future strategic objectives. The budget enables executives to determine which specific service lines are profitable or unprofitable. Administrators and clinicians at all levels are involved in the budgeting process.

  19. Supporting Air and Space Expeditionary Forces: Expanded Operational Architecture for Combat Support Execution Planning and Control

    National Research Council Canada - National Science Library

    Mills, Patrick; Evers, Ken; Kinlin, Donna; Tripp, Robert S

    2006-01-01

    During the past decade, the U.S. military has supported continuous deployments of forces around the world, often on very short notice and for prolonged duration, to meet the needs of a wide range of peacekeeping and humanitarian...

  20. Association between two distinct executive tasks in schizophrenia: a functional transcranial Doppler sonography study

    Directory of Open Access Journals (Sweden)

    Theodoridou Anastasia

    2006-05-01

    Full Text Available Abstract Background Schizophrenia is a severe mental disorder involving impairments in executive functioning, which are important cognitive processes that can be assessed by planning tasks such as the Stockings of Cambridge (SOC, and tasks of rule learning/abstraction such as the Wisconsin Card Sorting Test (WCST. We undertook this study to investigate the association between performance during separate phases of SOC and WCST, including mean cerebral blood flow velocity (MFV measurements in chronic schizophrenia. Methods Functional transcranial Doppler sonography (fTCD was used to assess bilateral MFV changes in the middle (MCA and anterior (ACA cerebral arteries. Twenty-two patients with chronic schizophrenia and 20 healthy subjects with similar sociodemographic characteristics performed SOC and WCST during fTCD measurements of the MCA and the ACA. The SOC was varied in terms of easy and difficult problems, and also in terms of separate phases, namely mental planning and movement execution. The WCST performance was assessed separately for maintaining set and set shifting. This allowed us to examine the impact of problem difficulty and the impact of separate phases of a planning task on distinct intervals of WCST. Simultaneous registration of MFV was carried out to investigate the linkage of brain perfusion during the tasks. Results In patients, slowing of movement execution during easy problems (SOC was associated with slowing during maintaining set (WCST (P Conclusion The results of this study demonstrate performance and brain perfusion abnormalities in the association pattern of two different tasks of executive functioning in schizophrenia, and they support the notion that executive functions have a pathological functional correlate predominantly in the lateral hemispheres of the brain. This study also underpins the scientific potential of fTCD in assessing brain perfusion in patients with schizophrenia.

  1. Do Children's Executive Functions Account for Associations between Early Autonomy-Supportive Parenting and Achievement through High School?

    Science.gov (United States)

    Bindman, Samantha W.; Pomerantz, Eva M.; Roisman, Glenn I.

    2015-01-01

    This study evaluated whether the positive association between early autonomy-supportive parenting and children's subsequent achievement is mediated by children's executive functions. Using observations of mothers' parenting from the National Institute of Child Health and Human Development (NICHD) Study of Early Child Care and Youth Development (N…

  2. Science Planning Implementation and Challenges for the ExoMars Trace Gas Orbiter

    Science.gov (United States)

    Ashman, Mike; Cardesin Moinelo, Alejandro; Frew, David; Garcia Beteta, Juan Jose; Geiger, Bernhard; Metcalfe, Leo; Muñoz, Michela; Nespoli, Federico

    2018-05-01

    The ExoMars Science Operations Centre (SOC) is located at ESA's European Space Astronomy Centre (ESAC) in Madrid, Spain and is responsible for coordinating the science planning activities for TGO in order to optimize the scientific return of the mission. The SOC constructs, in accordance with Science Working Team (SWT) science priorities, and in coordination with the PI science teams and ESA's Mission Operations Centre (MOC), a plan of scientific observations and delivers conflict free operational products for uplink and execution on-board. To achieve this, the SOC employs a planning concept based on Long, Medium and Short Term planning cycles. Long Term planning covers mission segments of several months and is conducted many months prior to execution. Its goal is to establish a feasible science observation strategy given the science priorities and the expected mission profile. Medium Term planning covers a 1 month mission segment and is conducted from 3 to 2 months prior to execution whilst Short Term planning covers a 1 week segment and is conducted from 2 weeks to 1 week prior to execution. The goals of Medium and Short Term planning are to operationally instantiate and validate the Long Term plan such that the SOC may deliver to MOC a conflict free spacecraft pointing profile request (a Medium Term planning deliverable), and the final instrument telecommanding products (a Short Term planning deliverable) such that the science plan is achieved and all operational constraints are met. With a 2 hour-400km science orbit, the vast number of solar occultation, nadir measurement, and surface imaging opportunities, combined with additional mission constraints such as the necessary provision of TGO communication slots to support the ExoMars 2020 Rover & Surface Platform mission and NASA surface assets, creates a science planning task of considerable magnitude and complexity. In this paper, we detail how the SOC is developing and implementing the necessary planning

  3. Educating Executive Function

    Science.gov (United States)

    Blair, Clancy

    2016-01-01

    Executive functions are thinking skills that assist with reasoning, planning, problem solving, and managing one’s life. The brain areas that underlie these skills are interconnected with and influenced by activity in many different brain areas, some of which are associated with emotion and stress. One consequence of the stress-specific connections is that executive functions, which help us to organize our thinking, tend to be disrupted when stimulation is too high and we are stressed out, or too low when we are bored and lethargic. Given their central role in reasoning and also in managing stress and emotion, scientists have conducted studies, primarily with adults, to determine whether executive functions can be improved by training. By and large, results have shown that they can be, in part through computer-based videogame-like activities. Evidence of wider, more general benefits from such computer-based training, however, is mixed. Accordingly, scientists have reasoned that training will have wider benefits if it is implemented early, with very young children as the neural circuitry of executive functions is developing, and that it will be most effective if embedded in children’s everyday activities. Evidence produced by this research, however, is also mixed. In sum, much remains to be learned about executive function training. Without question, however, continued research on this important topic will yield valuable information about cognitive development. PMID:27906522

  4. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  5. Research Plan of the Operations Research Center and Department of Systems Engineering for the Academic Year 2005

    National Research Council Canada - National Science Library

    Kwinn, Michael

    2004-01-01

    ...) for the Academic Year 04-05. The research plan includes a statement of purpose for research which supports DSE and the ORCEN, a description of the two organizations, a list of the key personnel responsible for executing the plan...

  6. The use of GIS-based support of recreational trail planning by local governments

    DEFF Research Database (Denmark)

    Olafsson, Anton Stahl; Skov-Petersen, Hans

    2014-01-01

    In the last decade, multiple GIS-based planning support systems have been developed in order to improve the basis for spatial planning. Recent research has focused on problems regarding a lack of utilisation or barriers to the use of advanced GIS and GIS-based planning support systems in planning...... applications. This paper discusses these research findings in the context of outdoor recreational planning by local governments in Denmark. According to a national survey of municipal planners, GIS-based planning support is widely used in Denmark, but more GIS is needed and is being requested for local outdoor...... recreation planning. However, considerable differences exist between the ways municipalities assess their need for and use of GIS planning support. These differences are explored in more detail using a factor analysis of planning variables and uses of GIS. Three situations are described: 1) extensive network...

  7. Autism Spectrum Disorder and intact executive functioning.

    Science.gov (United States)

    Ferrara, R; Ansermet, F; Massoni, F; Petrone, L; Onofri, E; Ricci, P; Archer, T; Ricci, S

    2016-01-01

    Earliest notions concerning autism (Autism Spectrum Disorders, ASD) describe the disturbance in executive functioning. Despite altered definition, executive functioning, expressed as higher cognitive skills required complex behaviors linked to the prefrontal cortex, are defective in autism. Specific difficulties in children presenting autism or verbal disabilities at executive functioning levels have been identified. Nevertheless, the developmental deficit of executive functioning in autism is highly diversified with huge individual variation and may even be absent. The aim of the present study to examine the current standing of intact executive functioning intact in ASD. Analysis of ASD populations, whether high-functioning, Asperger's or autism Broad Phenotype, studied over a range of executive functions including response inhibition, planning, cognitive flexibility, cognitive inhibition, and alerting networks indicates an absence of damage/impairment compared to the typically-developed normal control subjects. These findings of intact executive functioning in ASD subjects provide a strong foundation on which to construct applications for growth environments and the rehabilitation of autistic subjects.

  8. A Technical/Strategic Paradigm for Online Executive Education

    Science.gov (United States)

    Smith, Marlene A.; Keaveney, Susan M.

    2017-01-01

    This article discusses the development and delivery of online courses for the executive education audience. The goal is to introduce a new framework, the technical/strategic paradigm, that will help educators to identify the pedagogical needs of disparate executive groups and adjust their online course development plans accordingly. We describe…

  9. Pose Planning for the Feed Support System of FAST

    Directory of Open Access Journals (Sweden)

    Rui Yao

    2014-01-01

    Full Text Available A six-cable driven parallel manipulator and an A-B rotator in the feed support system of the Five-hundred-meter Aperture Spherical radio Telescope (FAST are adopted for realizing the position and pose of nine feeds. The six-cable driven parallel manipulator is a flexible mechanism, which may not be stably controlled due to a small cable tension. The A-B rotator is a rigid mechanism, and its stability and accuracy can be improved by small pose angle. Based on the different characteristics, a pose planning function is presented. The optimization target of the pose planning function is to get the smallest pose angle of the A-B rotator, and the constraint condition can reflect the controllability of the six-cable driven parallel manipulator. Then, the pose planning realization process of the feed support system is proposed. Based on the pose planning method, optimized pose angles of the feed support system for the nine feeds are obtained, which suggests that the pose angle of the six-cable driven parallel manipulator changes from 0° to 14° and the pose angle of the A-B rotator changes from 0° to 26.4°.

  10. Gender differences in visuospatial planning: an eye movements study.

    Science.gov (United States)

    Cazzato, Valentina; Basso, Demis; Cutini, Simone; Bisiacchi, Patrizia

    2010-01-20

    Gender studies report a male advantage in several visuospatial abilities. Only few studies however, have evaluated differences in visuospatial planning behaviour with regard to gender. This study was aimed at exploring whether gender may affect the choice of cognitive strategies in a visuospatial planning task and, if oculomotor measures could assist in disentangling the cognitive processes involved. A computerised task based on the travelling salesperson problem paradigm, the Maps test, was used to investigate these issues. Participants were required to optimise time and space of a path travelling among a set of sub-goals in a spatially constrained environment. Behavioural results suggest that there are no gender differences in the initial visual processing of the stimuli, but rather during the execution of the plan, with males showing a shorter execution time and a higher path length optimisation than females. Males often showed changes of heuristics during the execution while females seemed to prefer a constant strategy. Moreover, a better performance in behavioural and oculomotor measures seemed to suggest that males are more able than females in either the optimisation of spatial features or the realisation of the planned scheme. Despite inconclusive findings, the results support previous research and provide insight into the level of cognitive processing involved in navigation and planning tasks, with regard to the influence of gender.

  11. ROUTING FINANCIAL FLOWS AT THE EXECUTION OF THE MUNICIPALITY BUDGET

    Directory of Open Access Journals (Sweden)

    Mariya V. Fedotova

    2018-05-01

    Full Text Available Economic development of each administrative-territorial unit is an important factor in the economic development of the Russian Federation. In its turn, the effective execution of the budget at each level of the budget system is invariably topical, influencing the development of a system of both centralized and decentralized finance. The paramount characteristic of the organization of the budget execution of the municipality is an ability to ensure the timely and full execution of their commitments. There is a direct correlation of the budget process on both the revenue and expenditure sides. Cash gap in the local budget execution is actually quite common and, usually, inevitable, because revenues are coming unevenly during the financial year, budgetary expenditures are seasonal, and this threatens the execution of planned budgets; there is a need to raise funds. The article deals with the execution of the cash balance plan, cash flow at the single account of budget, debt and source of financing deficits. The analysis of financial flows in the execution of municipalities’ budget shows problems of execution of budget revenues and allows assessing the scale of emerging cash gaps. An outcome of the review consists in the recognition of an objective need to develop approaches to assessing the effectiveness of budget execution at all its stages and to implement the monitoring of the effectiveness of budget execution and timely effective measures for ensuring its high-quality.

  12. Executive summary of the KDIGO Controversies Conference on Supportive Care in Chronic Kidney Disease: developing a roadmap to improving quality care.

    Science.gov (United States)

    Davison, Sara N; Levin, Adeera; Moss, Alvin H; Jha, Vivekanand; Brown, Edwina A; Brennan, Frank; Murtagh, Fliss E M; Naicker, Saraladevi; Germain, Michael J; O'Donoghue, Donal J; Morton, Rachael L; Obrador, Gregorio T

    2015-09-01

    Patients with advanced chronic kidney disease (CKD) have a high burden of physical and psychosocial symptoms, poor outcomes, and high costs of care. Current paradigms of care for this highly vulnerable population are variable, prognostic and assessment tools are limited, and quality of care, particularly regarding conservative and palliative care, is suboptimal. The KDIGO Controversies Conference on Supportive Care in CKD reviewed the current state of knowledge in order to define a roadmap to guide clinical and research activities focused on improving the outcomes of people living with advanced CKD, including those on dialysis. An international group of multidisciplinary experts in CKD, palliative care, methodology, economics, and education identified the key issues related to palliative care in this population. The conference led to a working plan to address outstanding issues in this arena, and this executive summary serves as an output to guide future work, including the development of globally applicable guidelines.

  13. Cannabinoid modulation of executive functions

    NARCIS (Netherlands)

    Pattij, T.; Wiskerke, J.; Schoffelmeer, A.N.M.

    2008-01-01

    Executive functions are higher-order cognitive processes such as attention, behavioural flexibility, decision-making, inhibitory control, planning, time estimation and working memory that exert top-down control over behaviour. In addition to the role of cannabinoid signaling in other cognitive

  14. Optimization-based decision support systems for planning problems in processing industries

    NARCIS (Netherlands)

    Claassen, G.D.H.

    2014-01-01

    Summary

    Optimization-based decision support systems for planning problems in processing industries

    Nowadays, efficient planning of material flows within and between supply chains is of vital importance and has become one of the most challenging problems for decision support in

  15. Engineering Task Plan for Routine Engineering Support for Core Sampler System

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    Routine engineering support is required during normal operation of the core sampler trucks and associated ancillary equipment. This engineering support consists of, but is not limited to, troubleshooting operation problems, correcting minor design problems, assistance with work package preparation, assistance with procurement, fabrication shop support, planning of engineering tasks and preparation of associated Engineering Task Plans (ETP) and Engineering Service Requests (ESR). This ETP is the management plan document for implementing routine engineering support. Any additional changes to the scope of this ETP shall require a Letter of Instruction from Lockheed Martin Hanford Corp (LMHC). This document will also be the Work Planning Document for Development Control (HNF 1999a). The scope of this task will be to provide routine engineering support for Characterization equipment as required to support Characterization Operations. A task by task decision will be made by management to determine which tasks will be done per this ETP and if additional ETPs and/or ESRs are required. Due to the unique nature of this task, the only identifiable deliverable is to provide support as requested. Deliverables will be recorded in a task logbook as activities are identified. ESRs will be generated for tasks that require more than 40 person hours to complete, per Characterization Engineering Desk Instructions (DI 1999a)

  16. Strategies and Decision Support Systems for Integrating Variable Energy Resources in Control Centers for Reliable Grid Operations. Executive Summary

    Energy Technology Data Exchange (ETDEWEB)

    Jones, Lawrence E. [Alstom Grid, Inc., Washington, DC (United States)

    2011-11-01

    This is the executive summary for a report that provides findings from the field regarding the best ways in which to guide operational strategies, business processes and control room tools to support the integration of renewable energy into electrical grids.

  17. Agent Technology supports Inter-Organizational Planning in the Port

    NARCIS (Netherlands)

    J.M. Moonen (Hans); B. van de Rakt (Bastiaan); I. Miller; J.A.E.E. van Nunen (Jo); J. van Hillegersberg (Jos)

    2005-01-01

    textabstractThe Port of Rotterdam is a key container transshipment hub for Europe. Inland container shipping is important to connect the hinterland (40% market share). Barges visit several terminals per round-trip through the Port, thus requiring a proper planning support – to avoid planning

  18. Greening the Department of Energy through waste prevention, recycling, and Federal acquisition. Strategic plan to implement Executive Order 13101

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-11-01

    This Plan provides strategies and milestones to implement Executive Order 13101, Greening the Government Through Waste Prevention, Recycling, and Federal Acquisition, and to achieve the new Secretarial goals for 2005 and 2010. It serves as the principal Secretarial guidance to Department of Energy (DOE) Headquarters, Field Offices, and laboratory and contractor staff to improve sanitary waste prevention, recycling, and the purchase and use of recycled content and environmentally preferable products and services in the DOE.

  19. Development and Deployment of NASA's Budget Execution Dashboard

    Science.gov (United States)

    Putz, Peter

    2009-01-01

    This paper discusses the successful implementation of a highly visible company-wide management system and its potential to change managerial and accounting policies, processes and practices in support of organizational goals. Applying the conceptual framework of innovation in organizations, this paper describes the development and deployment process of the NASA Budget Execution Dashboard and the first two fiscal years of its use. It discusses the positive organizational changes triggered by the dashboard, like higher visibility of financial goals and variances between plans and actuals, increased involvement of all management levels in tracking and correcting of plan deviations, establishing comparable data standards across a strongly diversified organization, and enhanced communication between line organizations (NASA Centers) and product organizations (Mission Directorates). The paper also discusses the critical success factors experienced in this project: Strong leadership and division of management roles, rapid and responsive technology development, and frequent communication among stakeholders.

  20. Rumination prospectively predicts executive functioning impairments in adolescents.

    Science.gov (United States)

    Connolly, Samantha L; Wagner, Clara A; Shapero, Benjamin G; Pendergast, Laura L; Abramson, Lyn Y; Alloy, Lauren B

    2014-03-01

    The current study tested the resource allocation hypothesis, examining whether baseline rumination or depressive symptom levels prospectively predicted deficits in executive functioning in an adolescent sample. The alternative to this hypothesis was also evaluated by testing whether lower initial levels of executive functioning predicted increases in rumination or depressive symptoms at follow-up. A community sample of 200 adolescents (ages 12-13) completed measures of depressive symptoms, rumination, and executive functioning at baseline and at a follow-up session approximately 15 months later. Adolescents with higher levels of baseline rumination displayed decreases in selective attention and attentional switching at follow-up. Rumination did not predict changes in working memory or sustained and divided attention. Depressive symptoms were not found to predict significant changes in executive functioning scores at follow-up. Baseline executive functioning was not associated with change in rumination or depression over time. Findings partially support the resource allocation hypothesis that engaging in ruminative thoughts consumes cognitive resources that would otherwise be allocated towards difficult tests of executive functioning. Support was not found for the alternative hypothesis that lower levels of initial executive functioning would predict increased rumination or depressive symptoms at follow-up. Our study is the first to find support for the resource allocation hypothesis using a longitudinal design and an adolescent sample. Findings highlight the potentially detrimental effects of rumination on executive functioning during early adolescence. Copyright © 2013 Elsevier Ltd. All rights reserved.

  1. Developing and executing a strategic plan.

    Science.gov (United States)

    Morley, Glenn

    2010-02-01

    Because of the historic economic crisis, the past 18 months--2008 and the first half of 2009--have been challenging for many plastic surgery practices. Prior to the economic crisis in 2008, many practices enjoyed success with little synchronization between financial and productivity results, practice goals, and strategic planning. Now, suddenly, there is a great deal of interest in the alignment of budgets and financial reporting, marketing return on investment (ROI), staff accountability, and overhead management. The process of developing a business plan can serve to bring clarity and objectivity to the assessment of practice goals and market dynamics. The business planning process also provides assurance of more efficient use of the practice's human and capital resources. Ultimately, the process will bring order, discipline, and focus to practice stakeholders, thus increasing the likelihood of meeting or exceeding practice goals. The process: (1) defining the mission of the practice; (2) completing a competitive analysis for your market; (3) completing an assessment of your current environment; (4) completing an assessment of the financial health of your practice; (5) preparation of a SWOT (strengths, weakness, opportunity, threat) analysis; and (6) a translation of your mission statement into specific long-term goals and short-term performance objectives. The outcome of completing these tasks should be an actionable plan that will serve as a guide or road map for the practice. A well-articulated plan will solidify staff confidence, continue the advancement of a strong business foundation, and provide clear navigation through this new economic landscape in a way that preserves your ability to provide the care you have devoted yourselves to deliver. Today's needs, and yesterday's lessons, dictate that a well-documented strategic action plan be undertaken. Thieme Medical Publishers.

  2. Self-reported executive functioning competencies and lifetime aggression.

    Science.gov (United States)

    King, Alan R; Breen, Cody M; Russell, Tiffany D; Nerpel, Brady P; Pogalz, Colton R

    2017-05-08

    Neuropsychological research can be advanced through a better understanding of relationships between executive functioning (EF) behavioral competencies and the expression of aggressive behavior. While performance-based EF measures have been widely examined, links between self-report indices and practical real-life outcomes have not yet been established. Executive Functioning Index subscale scores in this sample (N = 579) were linked to trait hostility (Buss-Perry Aggression Questionnaire), aggression in the natural environment (Lifetime Acts of Violence Assessment), and conduct disorder symptoms prior to age 15. Significant associations were found between all of the EFI subscales (Motivational Drive, Organization, Strategic Planning, Impulse Control, and Empathy), trait aggression, and conduct disturbance. Lifetime acts of aggression were predicted by all but Organization scores. Physical injuries inflicted on other(s) were 2 to 4 times more likely to occur among respondents generating low (z < -1) EFI subscale scores. While these EFI relationships were modest in size, they are pervasive in scope. These findings provide support for the potential role of perceived EF deficits in moderating lifetime aggression.

  3. Characterizing Cognitive Aging of Working Memory and Executive Function in Animal Models

    Directory of Open Access Journals (Sweden)

    Jennifer Lynn Bizon

    2012-09-01

    Full Text Available Executive functions supported by prefrontal cortical systems provide essential control and planning mechanisms to guide goal-directed behavior. As such, age-related alterations in executive functions can mediate profound and widespread deficits on a diverse array of neurocognitive processes. Many of the critical neuroanatomical and functional characteristics of prefrontal cortex are preserved in rodents, allowing for meaningful cross-species comparisons relevant to the study of cognitive aging. In particular, as rodents lend themselves to genetic, cellular and biochemical approaches, rodent models of executive function stand to significantly contribute to our understanding of the critical neurobiological mechanisms that mediate decline of executive processes across the lifespan. Moreover, rodent analogues of executive functions that decline in human aging represent an essential component of a targeted, rational approach for developing and testing effective treatment and prevention therapies for age-related cognitive decline. This paper reviews behavioral approaches used to study executive function in rodents, with a focus on those assays that share a foundation in the psychological and neuroanatomical constructs important for human aging. A particular emphasis is placed on behavioral approaches used to assess working memory and cognitive flexibility, which are sensitive to decline with age across species and for which strong rodent models currently exist. In addition, other approaches in rodent behavior that have potential for providing analogues to functions that reliably decline to human aging (e.g., information processing speed are discussed.

  4. Model based decision support for planning of road maintenance

    NARCIS (Netherlands)

    van Harten, Aart; Worm, J.M.; Worm, J.M.

    1996-01-01

    In this article we describe a Decision Support Model, based on Operational Research methods, for the multi-period planning of maintenance of bituminous pavements. This model is a tool for the road manager to assist in generating an optimal maintenance plan for a road. Optimal means: minimising the

  5. An Embodied Account of Early Executive-Function Development

    Science.gov (United States)

    Gottwald, Janna M.; Achermann, Sheila; Marciszko, Carin; Lindskog, Marcus; Gredebäck, Gustaf

    2016-01-01

    The importance of executive functioning for later life outcomes, along with its potential to be positively affected by intervention programs, motivates the need to find early markers of executive functioning. In this study, 18-month-olds performed three executive-function tasks—involving simple inhibition, working memory, and more complex inhibition—and a motion-capture task assessing prospective motor control during reaching. We demonstrated that prospective motor control, as measured by the peak velocity of the first movement unit, is related to infants’ performance on simple-inhibition and working memory tasks. The current study provides evidence that motor control and executive functioning are intertwined early in life, which suggests an embodied perspective on executive-functioning development. We argue that executive functions and prospective motor control develop from a common source and a single motive: to control action. This is the first demonstration that low-level movement planning is related to higher-order executive control early in life. PMID:27765900

  6. Site Support Program Plan for ICF Kaiser Hanford Company

    International Nuclear Information System (INIS)

    Benedetti, R.L.

    1994-10-01

    This document describes the Hanford Reservation site support program plan for each support division, in terms of safety, environmental concerns, costs, and reliability. Support services include the following: Piped Utilities; Electrical utilities; transportation; Energy management; General Administration Support Buildings; electrical safety upgrades. Contained in this Volume II is information covering the following: Operations and maintenance Utilities; Piped Utilities; Water systems Administration and Sampling; electrical utilities

  7. Engineering and Implementing an Executive-Level Communication Plan in a Global Professional Environment: A Case Study

    Directory of Open Access Journals (Sweden)

    Bridgette Lipman

    2015-06-01

    Full Text Available Communication within organisations in a global environment requires effective internal and strategic planning at the executive level. Previous studies indicate that measurement is a key factor in assessing the needs and success of global communication within an organisation. Survey questions were used to measure satisfaction responses from 650 local and 110 global employees in a technology division of a large manufacturing company. In this case study, employees expressed the need to connect team members through face-to-face meetings, employee webcast meetings, web chat forums, and an updated employee networking site. The findings formed the foundations for recommendations for strategy, objectives, and tactics within the organisation.

  8. Optimization-based decision support systems for planning problems in processing industries

    OpenAIRE

    Claassen, G.D.H.

    2014-01-01

    Summary Optimization-based decision support systems for planning problems in processing industries Nowadays, efficient planning of material flows within and between supply chains is of vital importance and has become one of the most challenging problems for decision support in practice. The tremendous progress in hard- and software of the past decades was an important gateway for developing computerized systems that are able to support decision making on different levels within enterprises. T...

  9. Educating executive function.

    Science.gov (United States)

    Blair, Clancy

    2017-01-01

    Executive functions are thinking skills that assist with reasoning, planning, problem solving, and managing one's life. The brain areas that underlie these skills are interconnected with and influenced by activity in many different brain areas, some of which are associated with emotion and stress. One consequence of the stress-specific connections is that executive functions, which help us to organize our thinking, tend to be disrupted when stimulation is too high and we are stressed out, or too low when we are bored and lethargic. Given their central role in reasoning and also in managing stress and emotion, scientists have conducted studies, primarily with adults, to determine whether executive functions can be improved by training. By and large, results have shown that they can be, in part through computer-based videogame-like activities. Evidence of wider, more general benefits from such computer-based training, however, is mixed. Accordingly, scientists have reasoned that training will have wider benefits if it is implemented early, with very young children as the neural circuitry of executive functions is developing, and that it will be most effective if embedded in children's everyday activities. Evidence produced by this research, however, is also mixed. In sum, much remains to be learned about executive function training. Without question, however, continued research on this important topic will yield valuable information about cognitive development. WIREs Cogn Sci 2017, 8:e1403. doi: 10.1002/wcs.1403 For further resources related to this article, please visit the WIREs website. © 2016 Wiley Periodicals, Inc.

  10. Investigating the effects of caffeine on executive functions using traditional Stroop and a new ecologically-valid virtual reality task, the Jansari assessment of Executive Functions (JEF(©)).

    Science.gov (United States)

    Soar, K; Chapman, E; Lavan, N; Jansari, A S; Turner, J J D

    2016-10-01

    Caffeine has been shown to have effects on certain areas of cognition, but in executive functioning the research is limited and also inconsistent. One reason could be the need for a more sensitive measure to detect the effects of caffeine on executive function. This study used a new non-immersive virtual reality assessment of executive functions known as JEF(©) (the Jansari Assessment of Executive Function) alongside the 'classic' Stroop Colour-Word task to assess the effects of a normal dose of caffeinated coffee on executive function. Using a double-blind, counterbalanced within participants procedure 43 participants were administered either a caffeinated or decaffeinated coffee and completed the 'JEF(©)' and Stroop tasks, as well as a subjective mood scale and blood pressure pre- and post condition on two separate occasions a week apart. JEF(©) yields measures for eight separate aspects of executive functions, in addition to a total average score. Findings indicate that performance was significantly improved on the planning, creative thinking, event-, time- and action-based prospective memory, as well as total JEF(©) score following caffeinated coffee relative to the decaffeinated coffee. The caffeinated beverage significantly decreased reaction times on the Stroop task, but there was no effect on Stroop interference. The results provide further support for the effects of a caffeinated beverage on cognitive functioning. In particular, it has demonstrated the ability of JEF(©) to detect the effects of caffeine across a number of executive functioning constructs, which weren't shown in the Stroop task, suggesting executive functioning improvements as a result of a 'typical' dose of caffeine may only be detected by the use of more real-world, ecologically valid tasks. Copyright © 2016 Elsevier Ltd. All rights reserved.

  11. 3D treatment planning systems.

    Science.gov (United States)

    Saw, Cheng B; Li, Sicong

    2018-01-01

    Three-dimensional (3D) treatment planning systems have evolved and become crucial components of modern radiation therapy. The systems are computer-aided designing or planning softwares that speed up the treatment planning processes to arrive at the best dose plans for the patients undergoing radiation therapy. Furthermore, the systems provide new technology to solve problems that would not have been considered without the use of computers such as conformal radiation therapy (CRT), intensity-modulated radiation therapy (IMRT), and volumetric modulated arc therapy (VMAT). The 3D treatment planning systems vary amongst the vendors and also the dose delivery systems they are designed to support. As such these systems have different planning tools to generate the treatment plans and convert the treatment plans into executable instructions that can be implemented by the dose delivery systems. The rapid advancements in computer technology and accelerators have facilitated constant upgrades and the introduction of different and unique dose delivery systems than the traditional C-arm type medical linear accelerators. The focus of this special issue is to gather relevant 3D treatment planning systems for the radiation oncology community to keep abreast of technology advancement by assess the planning tools available as well as those unique "tricks or tips" used to support the different dose delivery systems. Copyright © 2018 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.

  12. Executive summary, Hanford Site Pollution Prevention Plan

    International Nuclear Information System (INIS)

    1992-08-01

    A pollution prevention plan is an organized, comprehensive, and continual effort to systematically reduce waste generation. The Hanford Site Pollution Prevention Plan is designed to eliminate or minimize pollutant releases to all environmental media from all aspects of Site operations. These efforts offer increased protection of public health and the environment. This plan reflects the goals and policies for pollution prevention at the Hanford Site and represents an ongoing effort to make pollution prevention part of the Site operating philosophy. The plan encompasses hazardous waste only and excludes radioactive waste and radioactive mixed waste

  13. NIF Operations Management Plan, August 2011

    Energy Technology Data Exchange (ETDEWEB)

    Van Wonterghem, Bruno M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States). National Ignition Facility (NIF)

    2014-01-30

    Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in the laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the

  14. Evaluating collaborative planning methods supporting programmebased planning in natural resource management

    Czech Academy of Sciences Publication Activity Database

    Vacik, H.; Kurttila, M.; Hujala, T.; Khadka, Chiranjeewee; Haara, A.; Pykäläinen, J.; Honkakoski, P.; Wolfslehner, B.

    2014-01-01

    Roč. 144, NOV 2014 (2014), s. 304-315 ISSN 0301-4797 R&D Projects: GA MŠk(CZ) ED1.1.00/02.0073 Institutional support: RVO:67179843 Keywords : participatory planning * group decision making * problem identification * problem modeling * problem solving * natural resource management Subject RIV: EH - Ecology, Behaviour Impact factor: 2.723, year: 2014

  15. Development and refinement of computer-assisted planning and execution system for use in face-jaw-teeth transplantation to improve skeletal and dento-occlusal outcomes.

    Science.gov (United States)

    Hashemi, Sepehr; Armand, Mehran; Gordon, Chad R

    2016-10-01

    To describe the development and refinement of the computer-assisted planning and execution (CAPE) system for use in face-jaw-teeth transplants (FJTTs). Although successful, some maxillofacial transplants result in suboptimal hybrid occlusion and may require subsequent surgical orthognathic revisions. Unfortunately, the use of traditional dental casts and splints pose several compromising shortcomings in the context of FJTT and hybrid occlusion. Computer-assisted surgery may overcome these challenges. Therefore, the use of computer-assisted orthognathic techniques and functional planning may prevent the need for such revisions and improve facial-skeletal outcomes. A comprehensive CAPE system for use in FJTT was developed through a multicenter collaboration and refined using plastic models, live miniature swine surgery, and human cadaver models. The system marries preoperative surgical planning and intraoperative execution by allowing on-table navigation of the donor fragment relative to recipient cranium, and real-time reporting of patient's cephalometric measurements relative to a desired dental-skeletal outcome. FJTTs using live-animal and cadaveric models demonstrate the CAPE system to be accurate in navigation and beneficial in improving hybrid occlusion and other craniofacial outcomes. Future refinement of the CAPE system includes integration of more commonly performed orthognathic/maxillofacial procedures.

  16. Campus Capability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Adams, C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Arsenlis, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bailey, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bergman, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Brase, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Brenner, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Camara, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Carlton, H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Cheng, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Chrzanowski, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Colson, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); East, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Farrell, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ferranti, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Gursahani, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hansen, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Helms, L. L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hernandez, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jeffries, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Larson, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lu, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); McNabb, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mercer, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Skeate, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sueksdorf, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Zucca, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Le, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ancria, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Scott, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Leininger, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Gagliardi, F. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Gash, A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bronson, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Chung, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hobson, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Meeker, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sanchez, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Zagar, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Quivey, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sommer, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Atherton, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-06-06

    Lawrence Livermore National Laboratory Campus Capability Plan for 2018-2028. Lawrence Livermore National Laboratory (LLNL) is one of three national laboratories that are part of the National Nuclear Security Administration. LLNL provides critical expertise to strengthen U.S. security through development and application of world-class science and technology that: Ensures the safety, reliability, and performance of the U.S. nuclear weapons stockpile; Promotes international nuclear safety and nonproliferation; Reduces global danger from weapons of mass destruction; Supports U.S. leadership in science and technology. Essential to the execution and continued advancement of these mission areas are responsive infrastructure capabilities. This report showcases each LLNL capability area and describes the mission, science, and technology efforts enabled by LLNL infrastructure, as well as future infrastructure plans.

  17. Analysis of the Contingency Contracting Support Plan within the Joint Planning Process Framework

    National Research Council Canada - National Science Library

    Anderson, Michael

    2003-01-01

    ...) flexibility and responsiveness. Current OPLANS at the Joint-level generally discuss how forces will be contractually supported in-theater, but are not specific enough within the framework of the Joint Planning Process (JPP...

  18. No sympathy for the devil: attributing psychopathic traits to capital murderers also predicts support for executing them.

    Science.gov (United States)

    Edens, John F; Davis, Karen M; Fernandez Smith, Krissie; Guy, Laura S

    2013-04-01

    Mental health evidence concerning antisocial and psychopathic traits appears to be introduced frequently in capital murder trials in the United States to argue that defendants are a "continuing threat" to society and thus worthy of execution. Using a simulation design, the present research examined how layperson perceptions of the psychopathic traits exhibited by a capital defendant would impact their attitudes about whether he should receive a death sentence. Across three studies (total N = 362), ratings of a defendant's perceived level of psychopathy strongly predicted support for executing him. The vast majority of the predictive utility was attributable to interpersonal and affective traits historically associated with psychopathy rather than traits associated with a criminal and socially deviant lifestyle. A defendant's perceived lack of remorse in particular was influential, although perceptions of grandiose self-worth and a manipulative interpersonal style also contributed incrementally to support for a death sentence. These results highlight how attributions regarding socially undesirable personality traits can have a pronounced negative impact on layperson attitudes toward persons who are perceived to exhibit these characteristics. PsycINFO Database Record (c) 2013 APA, all rights reserved.

  19. Waste minimization and pollution prevention awareness plan

    International Nuclear Information System (INIS)

    1994-08-01

    The primary mission of DOE/NV is to manage and operate the Nevada Test Site (NTS) and other designated test locations, within and outside the United States; provide facilities and services to DOE and non-DOE NTS users; and plan. coordinate, and execute nuclear weapons tests and related test activities. DOE/NV also: (a) Supports operations under interagency agreements pertaining to tests, emergencies, and related functions/activities, (b) Plans, coordinates, and executes environmental restoration, (c) Provides support to the Yucca Mountain Site Characterization Project Office in conjunction with DOE/HQ oversight, (d) Manages the Radioactive Waste Management Sites (RWMS) for disposal of low-level and mixed wastes received from the NTS and off-site generators, and (e) Implements waste minimization programs to reduce the amount of hazardous, mixed, radioactive, and nonhazardous solid waste that is generated and disposed The NTS, which is the primary facility controlled by DOE/NV, occupies 1,350 square miles of restricted-access, federally-owned land located in Nye County in Southern Nevada. The NTS is located in a sparsely populated area, approximately 65 miles northwest of Las Vegas, Nevada

  20. Automated planning through abstractions in dynamic and stochastic environments

    OpenAIRE

    Martínez Muñoz, Moisés

    2016-01-01

    Mención Internacional en el título de doctor Generating sequences of actions - plans - for an automatic system, like a robot, using Automated Planning is particularly diflicult in stochastic and/or dynamic environments. These plans are composed of actions whose execution, in certain scenarios, might fail, which in tum prevents the execution of the rest of the actions in the plan. Also, in some environments, plans must he generated fast, hoth at the start of the execution and after every ex...

  1. 25 CFR 1000.65 - What kinds of activities do planning and negotiation grants support?

    Science.gov (United States)

    2010-04-01

    ... INDIAN SELF-DETERMINATION AND EDUCATION ACT Other Financial Assistance for Planning and Negotiation... 25 Indians 2 2010-04-01 2010-04-01 false What kinds of activities do planning and negotiation... planning and negotiation grants support? The planning and negotiation grants support activities such as...

  2. Site Support Program Plan for ICF Kaiser Hanford Company

    International Nuclear Information System (INIS)

    Benedetti, R.L.

    1994-10-01

    This document describes the Hanford Reservation site support program plan for each support division, in terms of safety, environmental concerns, costs, and reliability. Support services include the following: Piped Utilities; Electrical utilities; transportation; Energy management; General Administration Support Buildings; electrical safety upgrades. This Volume III discusses Operations and Maintenance Transportation and the Transportation Department including fleet maintenance, railroad operations and track maintenance, bus operations, solid waste disposal, special delivery services, and road maintenance

  3. Implementing corporate wellness programs: a business approach to program planning.

    Science.gov (United States)

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  4. Execution and executability

    Science.gov (United States)

    Bradford, Robert W.; Harrison, Denise

    2015-09-01

    "We have a new strategy to grow our organization." Developing the plan is just the start. Implementing it in the organization is the real challenge. Many organizations don't fail due to lack of strategy; they struggle because it isn't effectively implemented. After working with hundreds of companies on strategy development, Denise and Robert have distilled the critical areas where organizations need to focus in order to enhance profitability through superior execution. If these questions are important to your organization, you'll find useful answers in the following articles: Do you find yourself overwhelmed by too many competing priorities? How do you limit how many strategic initiatives/projects your organization is working on at one time? How do you balance your resource requirements (time and money) with the availability of these resources? How do you balance your strategic initiative requirements with the day-to-day requirements of your organization?

  5. Fusion Simulation Program Execution Plan

    International Nuclear Information System (INIS)

    Brooks, Jeffrey

    2011-01-01

    The overall science goal of the FSP is to develop predictive simulation capability for magnetically confined fusion plasmas at an unprecedented level of integration and fidelity. This will directly support and enable effective U.S. participation in research related to the International Thermonuclear Experimental Reactor (ITER) and the overall mission of delivering practical fusion energy. The FSP will address a rich set of scientific issues together with experimental programs, producing validated integrated physics results. This is very well aligned with the mission of the ITER Organization to coordinate with its members the integrated modeling and control of fusion plasmas, including benchmarking and validation activities. [1]. Initial FSP research will focus on two critical areas: 1) the plasma edge and 2) whole device modeling including disruption avoidance. The first of these problems involves the narrow plasma boundary layer and its complex interactions with the plasma core and the surrounding material wall. The second requires development of a computationally tractable, but comprehensive model that describes all equilibrium and dynamic processes at a sufficient level of detail to provide useful prediction of the temporal evolution of fusion plasma experiments. The initial driver for the whole device model (WDM) will be prediction and avoidance of discharge-terminating disruptions, especially at high performance, which are a critical impediment to successful operation of machines like ITER. If disruptions prove unable to be avoided, their associated dynamics and effects will be addressed in the next phase of the FSP. The FSP plan targets the needed modeling capabilities by developing Integrated Science Applications (ISAs) specific to their needs. The Pedestal-Boundary model will include boundary magnetic topology, cross-field transport of multi-species plasmas, parallel plasma transport, neutral transport, atomic physics and interactions with the plasma wall

  6. Partner support for family planning and modern contraceptive use in ...

    African Journals Online (AJOL)

    Husband's/partner's support for family planning may influence a women's modern contraceptive use. Socio-demographic factors, couple communication about family planning, and fertility preferences are known to play a role in contraceptive use. We conducted logistic regression analysis to investigate the relationship ...

  7. ORGANIZATIONAL AND METHODIC SUPPORT TO COMMERCIAL BANK STRATEGIC PLANNING

    Directory of Open Access Journals (Sweden)

    N. G. Korostyliov

    2011-01-01

    Full Text Available Organizational and methodic support to bank activity strategic planning comprises making prospects for main bank finance activity indices, their correction and examination as well as control over their dynamics. There are specific features of organization of bank strategic planning at present stage of development of Russian economics. Main stages of this process and principles on which this study should be based are discussed. Banking environment information level should be taken into account, feasibility testing of organizational planning systems having to be undertaken in practice.

  8. Towards Data Management Planning Support for Research Data

    NARCIS (Netherlands)

    Görzig, Heike; Engel, Felix; Brocks, Holger; Vogel, Tobias; Hemmje, Matthias

    2015-01-01

    Görzig, H., Engel, F., Brocks, H., Vogel, T. & Hemmje, M. (2015, August). Towards Data Management Planning Support for Research Data. Paper presented at the ASE International Conference on Data Science, Stanford, United States of America.

  9. Advanced Life Support Project Plan

    Science.gov (United States)

    2002-01-01

    Life support systems are an enabling technology and have become integral to the success of living and working in space. As NASA embarks on human exploration and development of space to open the space frontier by exploring, using and enabling the development of space and to expand the human experience into the far reaches of space, it becomes imperative, for considerations of safety, cost, and crew health, to minimize consumables and increase the autonomy of the life support system. Utilizing advanced life support technologies increases this autonomy by reducing mass, power, and volume necessary for human support, thus permitting larger payload allocations for science and exploration. Two basic classes of life support systems must be developed, those directed toward applications on transportation/habitation vehicles (e.g., Space Shuttle, International Space Station (ISS), next generation launch vehicles, crew-tended stations/observatories, planetary transit spacecraft, etc.) and those directed toward applications on the planetary surfaces (e.g., lunar or Martian landing spacecraft, planetary habitats and facilities, etc.). In general, it can be viewed as those systems compatible with microgravity and those compatible with hypogravity environments. Part B of the Appendix defines the technology development 'Roadmap' to be followed in providing the necessary systems for these missions. The purpose of this Project Plan is to define the Project objectives, Project-level requirements, the management organizations responsible for the Project throughout its life cycle, and Project-level resources, schedules and controls.

  10. Questionnaire-based assessment of executive functioning: Case studies.

    Science.gov (United States)

    Kronenberger, William G; Castellanos, Irina; Pisoni, David B

    2018-01-01

    Delays in the development of executive functioning skills are frequently observed in pediatric neuropsychology populations and can have a broad and significant impact on quality of life. As a result, assessment of executive functioning is often relevant for the development of formulations and recommendations in pediatric neuropsychology clinical work. Questionnaire-based measures of executive functioning behaviors in everyday life have unique advantages and complement traditional neuropsychological measures of executive functioning. Two case studies of children with spina bifida are presented to illustrate the clinical use of a new questionnaire measure of executive and learning-related functioning, the Learning, Executive, and Attention Functioning Scale (LEAF). The LEAF emphasizes clinical utility in assessment by incorporating four characteristics: brevity in administration, breadth of additional relevant content, efficiency of scoring and interpretation, and ease of availability for use. LEAF results were consistent with another executive functioning checklist in documenting everyday behavior problems related to working memory, planning, and organization while offering additional breadth of assessment of domains such as attention, processing speed, and novel problem-solving. These case study results demonstrate the clinical utility of questionnaire-based measurement of executive functioning in pediatric neuropsychology and provide a new measure for accomplishing this goal.

  11. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE No. 98-D-453

    International Nuclear Information System (INIS)

    HOLSTEIN, W.A.

    1999-01-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, WA., currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration. Use of this document is described in the Project Hanford Policy and Procedure System under HNF-PRO-1999, Construction Program Conceptual Phase

  12. Knowledge in communicative planning practice : a different perspective for planning support systems

    NARCIS (Netherlands)

    Pelzer, Peter; Geertman, Stan; van der Heijden, Rob

    2015-01-01

    Although planning support systems (PSS) have now undergone more than two decades of research and development, this is not reflected in their practical application. In this paper we argue that one of the reasons for this is that too much emphasis is put on the instrument rather than the usage and

  13. Executive Summary - Future plans

    International Nuclear Information System (INIS)

    2005-01-01

    this purpose. However, we are fully aware of the difficulty of introducing cutting-edge medical technology to the Polish national health care system, in view of the immediate needs of this seriously undercapitalized service of our 40-million community. We need to devote special attention to further training our personnel. The present potential of the Institute allows our research group to participate in the most ambitious projects and collaborations. Availability of such highly educated and experienced technical staff is absolutely essential for performing this type of work. Such personnel is not usually available at universities, where the potential is spread-out to a much larger extent. We would like to maintain our group of engineers specialized in the development and construction of detectors, dedicated electronics and software needed for experimental physics. One of the principal goals of the Institute is to promote professional careers of young researchers in Poland. We would like to increase the participation of undergraduate and graduate (Ph.D.) students and short-term postdoctoral researchers, originating from Europe and outside, in activities of the research groups in the Institute. We plan to strengthen our cooperation with universities and technical universities in southern Poland (Cracow, Rzeszow, Kielce, Katowice and others) by teaching students and providing our laboratories and expertise to help them complete their theses. Further development of our International Post-Graduate Study Course, in collaboration with other institutions in the European Research Area, will be strongly supported

  14. Structures and Relationships between the Business Executive and Information Technology Executive at the University: A Mixed Methods Study

    Science.gov (United States)

    Hollman, Angela K.

    2014-01-01

    This study uses an explanatory mixed methods methodology to attempt to determine the reporting relationships between business and IT executives within the university. The study also explores IT and business executives thoughts on these relationships. Supporting research from organizational studies and business-IT alignment is combined in order to…

  15. Executive Function and Reading Comprehension: A Meta-Analytic Review

    Science.gov (United States)

    Follmer, D. Jake

    2018-01-01

    This article presents a meta-analytic review of the relation between executive function and reading comprehension. Results (N = 6,673) supported a moderate positive association between executive function and reading comprehension (r = 0.36). Moderator analyses suggested that correlations between executive function and reading comprehension did not…

  16. The contribution of executive control to semantic cognition: Convergent evidence from semantic aphasia and executive dysfunction

    OpenAIRE

    Thompson, Hannah E; Almaghyuli, Azizah; Noonan, Krist A.; Barak, Ohr; Lambon Ralph, Matthew; Jefferies, Elizabeth

    2018-01-01

    Semantic cognition, as described by the Controlled Semantic Cognition (CSC) framework (Rogers, Patterson, Jefferies, & Lambon Ralph, 2015), involves two key components: activation of coherent, generalizable concepts within a heteromodal ‘hub’ in combination with modality-specific features (spokes), and a constraining mechanism that manipulates and gates this knowledge to generate time- and task- appropriate behaviour. Executive-semantic goal representations, largely supported by executive...

  17. Investigating executive functions in children with severe speech and movement disorders using structured tasks

    Directory of Open Access Journals (Sweden)

    Kristine eStadskleiv

    2014-09-01

    Full Text Available Executive functions are the basis for goal-directed activity and include planning, monitoring, and inhibition, and language seems to play a role in the development of these functions. There is a tradition of studying executive function in both typical and atypical populations, and the present study investigates executive functions in children with severe speech and motor impairments who are communicating using communication aids with graphic symbols, letters and/or words. There are few neuropsychological studies of children in this group and little is known about their cognitive functioning, including executive functions. It was hypothesized that aided communication would tax executive functions more than speech. 29 children using communication aids and 27 naturally speaking children participated. Structured tasks resembling everyday activities, where the action goals had to be reached through communication with a partner, were used to get information about executive functions. The children a directed the partner to perform actions like building a Lego tower from a model the partner could not see and b gave information about an object without naming it to a person who had to guess what object it was. The executive functions of planning, monitoring and impulse control were coded from the children’s on-task behavior. Both groups solved most of the tasks correctly, indicating that aided communicators are able to use language to direct another person to do a complex set of actions. Planning and lack of impulsivity was positively related to task success in both groups. The aided group completed significantly fewer tasks, spent longer time and showed more variation in performance than the comparison group. The aided communicators scored lower on planning and showed more impulsivity than the comparison group, while both groups showed an equal degree of monitoring of the work progress. The results are consistent with the hypothesis that aided language

  18. Workplace Disruption following Psychological Trauma: Influence of Incident Severity Level on Organizations' Post-Incident Response Planning and Execution

    Directory of Open Access Journals (Sweden)

    GS DeFraia

    2016-04-01

    Full Text Available Background: Psychologically traumatic workplace events (known as critical incidents, which occur globally, are increasing in prevalence within the USA. Assisting employers in their response is a growing practice area for occupational medicine, occupational social work, industrial psychology and other occupational health professions. Traumatic workplace events vary greatly in their level of organizational disruption. Objective: To explore whether extent of workplace disruption influences organizations' decisions for post-incident response planning and plan execution. Methods: Administrative data mining was employed to examine practice data from a workplace trauma response unit in the USA. Bivariate analyses were conducted to test whether scores from an instrument measuring extent of workplace disruption associated with organizational decisions regarding post-incident response. Results: The more severe and disruptive the incident, the more likely organizations planned for and followed through to deliver on-site interventions. Following more severe incidents, organizations were also more likely to deliver group sessions and to complete follow-up consultations to ensure ongoing worker recovery. Conclusion: Increasing occupational health practitioners' knowledge of varying levels of organizational disruption and familiarity with a range of organizational response strategies improves incident assessment, consultation and planning, and ensures interventions delivered are consistent with the level of assistance needed on both worker and organizational levels.

  19. Workplace Disruption following Psychological Trauma: Influence of Incident Severity Level on Organizations' Post-Incident Response Planning and Execution.

    Science.gov (United States)

    DeFraia, G S

    2016-04-01

    Psychologically traumatic workplace events (known as critical incidents), which occur globally, are increasing in prevalence within the USA. Assisting employers in their response is a growing practice area for occupational medicine, occupational social work, industrial psychology and other occupational health professions. Traumatic workplace events vary greatly in their level of organizational disruption. To explore whether extent of workplace disruption influences organizations' decisions for post-incident response planning and plan execution. Administrative data mining was employed to examine practice data from a workplace trauma response unit in the USA. Bivariate analyses were conducted to test whether scores from an instrument measuring extent of workplace disruption associated with organizational decisions regarding post-incident response. The more severe and disruptive the incident, the more likely organizations planned for and followed through to deliver on-site interventions. Following more severe incidents, organizations were also more likely to deliver group sessions and to complete follow-up consultations to ensure ongoing worker recovery. Increasing occupational health practitioners' knowledge of varying levels of organizational disruption and familiarity with a range of organizational response strategies improves incident assessment, consultation and planning, and ensures interventions delivered are consistent with the level of assistance needed on both worker and organizational levels.

  20. Engineering Play: Exploring Associations with Executive Function, Mathematical Ability, and Spatial Ability in Preschool

    Science.gov (United States)

    Gold, Zachary Samuel

    Engineering play is a new perspective on preschool education that views constructive play as an engineering design process that parallels the way engineers think and work when they develop engineered solutions to human problems (Bairaktarova, Evangelou, Bagiati, & Brophy, 2011). Early research from this perspective supports its use in framing play as a key learning context. However, no research to date has examined associations between engineering play and other factors linked with early school success, such as executive function, mathematical ability, and spatial ability. Additionally, more research is needed to further validate a new engineering play observational measure. This study had two main goals: (1) to gather early validity data on the engineering play measure as a potentially useful instrument for documenting the occurrence of children's engineering play behaviors in educational contexts, such as block play. This was done by testing the factor structure of the engineering play behaviors in this sample and their association with preschoolers' planning, a key aspect of the engineering design process; (2) to explore associations between preschoolers' engineering play and executive function, mathematical ability, and spatial ability. Participants included 110 preschoolers (62 girls; 48 boys; M = 58.47 months) from 10 classrooms in the Midwest United States coded for their frequency of engagement in each of the nine engineering play behaviors. A confirmatory factor analysis resulted in one engineering play factor including six of the engineering play behaviors. A series of marginal regression models revealed that the engineering play factor was significantly and positively associated with the spatial horizontal rotation transformation. However, engineering play was not significantly related to planning ability, executive function, informal mathematical abilities, or other spatial transformation skills. Follow-up analyses revealed significant positive

  1. Strategic Audit and Marketing Plan

    Science.gov (United States)

    Wright, Lianna S.

    2013-01-01

    The purpose of this audit was to revise the marketing plan for ADSum Professional Development School and give the owner a long-term vision of the school to operate competitively in the crowded field of for-profit schools. It is fairly simple to create a strategic plan but harder to implement and execute. Execution requires weeks and months of…

  2. Using Executive Information Systems to Manage Capital Projects and Facilities.

    Science.gov (United States)

    Kaynor, Robert

    1993-01-01

    In higher education, facilities data are essential for long-term capital and financial planning and for testing assumptions underlying anticipated policy change. Executive information systems should incorporate life-cycle considerations (planning, construction, renovation, and management) and resource linkages (describing interrelationships of…

  3. An Architecture for Robot Assemblt Task Planning

    DEFF Research Database (Denmark)

    Sun, Hongyan

    1999-01-01

    This paper discusses an integrated robot assembly task planning system architecture. In such an integrated system, the robot motion commands produced from the planning system can be validated before done-loading for actual execution.......This paper discusses an integrated robot assembly task planning system architecture. In such an integrated system, the robot motion commands produced from the planning system can be validated before done-loading for actual execution....

  4. The contribution of executive control to semantic cognition: Convergent evidence from semantic aphasia and executive dysfunction.

    Science.gov (United States)

    Thompson, Hannah E; Almaghyuli, Azizah; Noonan, Krist A; Barak, Ohr; Lambon Ralph, Matthew A; Jefferies, Elizabeth

    2018-01-03

    Semantic cognition, as described by the controlled semantic cognition (CSC) framework (Rogers et al., , Neuropsychologia, 76, 220), involves two key components: activation of coherent, generalizable concepts within a heteromodal 'hub' in combination with modality-specific features (spokes), and a constraining mechanism that manipulates and gates this knowledge to generate time- and task-appropriate behaviour. Executive-semantic goal representations, largely supported by executive regions such as frontal and parietal cortex, are thought to allow the generation of non-dominant aspects of knowledge when these are appropriate for the task or context. Semantic aphasia (SA) patients have executive-semantic deficits, and these are correlated with general executive impairment. If the CSC proposal is correct, patients with executive impairment should not only exhibit impaired semantic cognition, but should also show characteristics that align with those observed in SA. This possibility remains largely untested, as patients selected on the basis that they show executive impairment (i.e., with 'dysexecutive syndrome') have not been extensively tested on tasks tapping semantic control and have not been previously compared with SA cases. We explored conceptual processing in 12 patients showing symptoms consistent with dysexecutive syndrome (DYS) and 24 SA patients, using a range of multimodal semantic assessments which manipulated control demands. Patients with executive impairments, despite not being selected to show semantic impairments, nevertheless showed parallel patterns to SA cases. They showed strong effects of distractor strength, cues and miscues, and probe-target distance, plus minimal effects of word frequency on comprehension (unlike semantic dementia patients with degradation of conceptual knowledge). This supports a component process account of semantic cognition in which retrieval is shaped by control processes, and confirms that deficits in SA patients reflect

  5. Lessons learned in planning the Canadian Nuclear Legacy Liabilities Program

    International Nuclear Information System (INIS)

    Stephens, Michael E.; Brooks, Sheila M.; Miller, Joan M.; Mason, Robert A.

    2011-01-01

    In 2006, Atomic Energy of Canada Limited (AECL) and Natural Resources Canada (NRCan) began implementing a $7B CDN, 70-year Nuclear Legacy Liabilities Program (NLLP) to deal with legacy decommissioning and environmental issues at AECL nuclear sites. The objective of the NLLP is to safely and cost-effectively reduce the nuclear legacy liabilities and associated risks based on sound waste management and environmental principles in the best interest of Canadians. The liabilities include shutdown research and prototype power reactors, fuel handling facilities, radiochemical laboratories, support buildings, radioactive waste storage facilities, and contaminated lands at several sites located across eastern Canada from Quebec to Manitoba. The largest site, Chalk River Laboratories (CRL) in Ontario, will continue as an operational nuclear site for the foreseeable future. Planning and delivery of the Program is managed by the Liability Management Unit (LMU), a group that was formed within AECL for the purpose. The composition and progress of the NLLP has been reported in recent conferences. The NLLP comprises a number of interlinked decommissioning, waste management and environmental restoration activities that are being executed at different sites, and by various technical groups as suppliers to the LMU. Many lessons about planning and executing such a large, diverse Program have been learned in planning the initial five-year 'start-up' phase (which will conclude 2011 March), in planning the five-year second phase (which is currently being finalized), and in planning individual and interacting activities within the Program. The activities to be undertaken in the start-up phase were planned by a small group of AECL technical experts using the currently available information on the liabilities. Progress in executing the Program was slower than anticipated due to less than ideal alignment between some planned technical solutions and the actual requirements, as well as the

  6. 45 CFR 1700.5 - Executive Director.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Executive Director. 1700.5 Section 1700.5 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND..., recommendation and implementation of overall plans and policies to achieve the Commission's goals. (d) To...

  7. 24 CFR 1710.117 - Cost sheet, signature of Senior Executive Officer.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Cost sheet, signature of Senior... REGISTRATION Reporting Requirements § 1710.117 Cost sheet, signature of Senior Executive Officer. (a) Cost... description of our subdivision and development plans. Signature of Senior Executive Officer (2) Cost sheet...

  8. Guidance for Federal Agencies on Executive Order 13693 - Federal Fleet Management

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2017-01-02

    Document contains guidance on the federal fleet requirements of Executive Order 13693: Planning for Federal Sustainability in the Next Decade and helps federal agencies subject to the executive order develop an overall approach for reducing total fleet greenhouse gas (GHG) emissions and fleet-wide per-mile GHG emissions.

  9. Studies on TOP executive performance evaluation system of Chinese listed companies

    Institute of Scientific and Technical Information of China (English)

    WANG De-wu 王德武; JIANG Guo-qing 姜国庆; JIANG Shuo 姜硕; HUANG Allen R

    2004-01-01

    According to the development status of Chinese listed companies, it is important to implement a stock option incentive plan for the top executives (TE) of the companies. It is necessary to establish a set of indices to evaluate a top executive's performance and award performance-based stock options to them scientifically and reasonably.This thesis sets indices from the perspective of the top executive's behaviour and results,which differs from the traditional methods performance evaluation.

  10. Prefrontal Engagement and Reduced Default Network Suppression Co-occur and Are Dynamically Coupled in Older Adults: The Default-Executive Coupling Hypothesis of Aging.

    Science.gov (United States)

    Turner, Gary R; Spreng, R Nathan

    2015-12-01

    Reduced executive control is a hallmark of neurocognitive aging. Poor modulation of lateral pFC activity in the context of increasing task challenge in old adults and a "failure to deactivate" the default network during cognitive control tasks have been observed. Whether these two patterns represent discrete mechanisms of neurocognitive aging or interact into older adulthood remains unknown. We examined whether altered pFC and default network dynamics co-occur during goal-directed planning over increasing levels of difficulty during performance on the Tower of London task. We used fMRI to investigate task- and age-related changes in brain activation and functional connectivity across four levels of task challenge. Frontoparietal executive control regions were activated and default network regions were suppressed during planning relative to counting performance in both groups. Older adults, unlike young, failed to modulate brain activity in executive control and default regions as planning demands increased. Critically, functional connectivity analyses revealed bilateral dorsolateral pFC coupling in young adults and dorsolateral pFC to default coupling in older adults with increased planning complexity. We propose a default-executive coupling hypothesis of aging. First, this hypothesis suggests that failure to modulate control and default network activity in response to increasing task challenge are linked in older adulthood. Second, functional brain changes involve greater coupling of lateral pFC and the default network as cognitive control demands increase in older adults. We speculate that these changes reflect an adaptive shift in cognitive approach as older adults come to rely more upon stored representations to support goal-directed task performance.

  11. Safe robot execution in model-based reinforcement learning

    OpenAIRE

    Martínez Martínez, David; Alenyà Ribas, Guillem; Torras, Carme

    2015-01-01

    Task learning in robotics requires repeatedly executing the same actions in different states to learn the model of the task. However, in real-world domains, there are usually sequences of actions that, if executed, may produce unrecoverable errors (e.g. breaking an object). Robots should avoid repeating such errors when learning, and thus explore the state space in a more intelligent way. This requires identifying dangerous action effects to avoid including such actions in the generated plans...

  12. Information and Communication Technology Tools in Support to the Executive Secretary Activities

    Directory of Open Access Journals (Sweden)

    Márcia Maria de Medeiros Travassos Saeger Martins

    2015-08-01

    Full Text Available Executive Secretary who longs to stand in organizations should seek to meet market requirements, with primary knowledge about information and communication technology. Its attributions, proper to modern management standards, must be carried out so that this professional can assist managers efficiently. In order to do so, Executive Secretary should make use of tools that aid in speeding up their actions, becoming more productive. In this context, this research was carried out with the Executive Secretaries and students who already work in the area or who are in trainning programs, aiming to investigate the use of Information and Communication Technology tools in the Executive Secretary work. Data collection was done through a structured questionnaire with objective questions, applied on Campus IV/UFPB, whose data were analyzed quantitatively, with results presented in tables and graphs. Based on the results, it was possible to consider that most respondents use ICT tools in their secretarial assignments, such as the computer and the internet. It was found that the majority believes that the use of these tools helps in managing their time when it comes to their duties. Among those who do not make use of ICT tools, most claimed that the organizations in which they work do not have these tools.

  13. Medical support to Sri Lanka in the wake of tsunamis: planning considerations and lessons learned.

    Science.gov (United States)

    Lane, David A

    2006-10-01

    When massive tsunamis affected the coast of Sri Lanka and other Indian Ocean littorals, elements of the Third Force Service Support Group and assigned Navy, Air Force, Army, and Coast Guard units from the U.S. Pacific Command were "task organized" to form Combined Support Group-Sri Lanka (CSG-SL), charged to conduct humanitarian assistance/disaster relief (HA/DR) operations. The specific mission was to provide immediate relief to the affected population of Sri Lanka and the Maldives, to minimize loss of life, and to mitigate human suffering. A 30-person health care team deployed to the northern province of Jaffna and provided medical assistance to that chronically underserved and acutely overstressed region. For a 12-day period, the team served as the principal medical staff of an under-resourced government hospital and conducted mobile primary care clinics at nearby welfare camps housing > 7,000 internally displaced persons made homeless by the tsunamis. By every measurable standard, CSG-SL accomplished its assigned HA/DR task in Sri Lanka, including the medical mission. In doing so, the medical team learned many important lessons, including five of particular value to planners of similar relief operations in the future. This article discusses the context in which CSG-SL planned and executed the medical aspects of its HA/DR operations in Sri Lanka, and it describes the most significant medical lessons learned.

  14. High-Impact Succession Management. Executive Summary

    Science.gov (United States)

    Lamoureux, Kim; Campbell, Michael; Smith, Roland

    2009-01-01

    Most companies have an opportunity to improve their succession management programs. The number one challenge for succession management (as identified by both HR leaders and executives) is developing a succession planning strategy. This comprehensive industry study sets out to determine how succession management (when done well) helps improve…

  15. Leveraging the BPEL Event Model to Support QoS-aware Process Execution

    Science.gov (United States)

    Zaid, Farid; Berbner, Rainer; Steinmetz, Ralf

    Business processes executed using compositions of distributed Web Services are susceptible to different fault types. The Web Services Business Process Execution Language (BPEL) is widely used to execute such processes. While BPEL provides fault handling mechanisms to handle functional faults like invalid message types, it still lacks a flexible native mechanism to handle non-functional exceptions associated with violations of QoS levels that are typically specified in a governing Service Level Agreement (SLA), In this paper, we present an approach to complement BPEL's fault handling, where expected QoS levels and necessary recovery actions are specified declaratively in form of Event-Condition-Action (ECA) rules. Our main contribution is leveraging BPEL's standard event model which we use as an event space for the created ECA rules. We validate our approach by an extension to an open source BPEL engine.

  16. Strategic planning as used by chief executive officers.

    Science.gov (United States)

    Boissoneau, R; Belton, P; Schwahn, B

    1992-01-01

    In summary, the interviews obtained from this study suggest that CEO's in a variety of industries are attempting to "fit" their strategic planning process to their perceived environmental conditions. Indeed, management thinkers believe the biggest challenge in strategic planning will be turning CEO's into true strategic thinkers. The most successful companies, ultimately, will make strategic planning a high priority and involve all levels of management in the process. Planning becomes the unifying force that directs company actions. Hospital CEO's are obviously becoming more aware of this point as they strive to include all relevant parties (boards, physicians, etc.) in the process. Further, they seem to view planning in the classical sense, that is, as a dynamic, ever-evolving cyclical process more so than their general industry and academic contemporaries. Those hospitals that do develop strategic planning and strategic management have a definite advantage over competitors. Priorities are set and objectives are validated. This, in turn, improves productivity and creates the necessary framework for controlled growth. In addition, planning promotes teamwork and heightens motivation, bringing managers and employees together not only to meet but to exceed company goals.

  17. Involvement of Spearman's g in conceptualisation versus execution of complex tasks.

    Science.gov (United States)

    Carroll, Ellen L; Bright, Peter

    2016-10-01

    Strong correlations between measures of fluid intelligence (or Spearman's g) and working memory are widely reported in the literature, but there is considerable controversy concerning the nature of underlying mechanisms driving this relationship. In the four experiments presented here we consider the role of response conflict and task complexity in the context of real-time task execution demands (Experiments 1-3) and also address recent evidence that g confers an advantage at the level of task conceptualisation rather than (or in addition to) task execution (Experiment 4). We observed increased sensitivity of measured fluid intelligence to task performance in the presence (vs. the absence) of response conflict, and this relationship remained when task complexity was reduced. Performance-g correlations were also observed in the absence of response conflict, but only in the context of high task complexity. Further, we present evidence that differences in conceptualisation or 'modelling' of task instructions prior to execution had an important mediating effect on observed correlations, but only when the task encompassed a strong element of response inhibition. Our results suggest that individual differences in ability reflect, in large part, variability in the efficiency with which the relational complexity of task constraints are held in mind. It follows that fluid intelligence may support successful task execution through the construction of effective action plans via optimal allocation of limited resources. Copyright © 2016 The Authors. Published by Elsevier B.V. All rights reserved.

  18. A Modular Repository-based Infrastructure for Simulation Model Storage and Execution Support in the Context of In Silico Oncology and In Silico Medicine.

    Science.gov (United States)

    Christodoulou, Nikolaos A; Tousert, Nikolaos E; Georgiadi, Eleni Ch; Argyri, Katerina D; Misichroni, Fay D; Stamatakos, Georgios S

    2016-01-01

    The plethora of available disease prediction models and the ongoing process of their application into clinical practice - following their clinical validation - have created new needs regarding their efficient handling and exploitation. Consolidation of software implementations, descriptive information, and supportive tools in a single place, offering persistent storage as well as proper management of execution results, is a priority, especially with respect to the needs of large healthcare providers. At the same time, modelers should be able to access these storage facilities under special rights, in order to upgrade and maintain their work. In addition, the end users should be provided with all the necessary interfaces for model execution and effortless result retrieval. We therefore propose a software infrastructure, based on a tool, model and data repository that handles the storage of models and pertinent execution-related data, along with functionalities for execution management, communication with third-party applications, user-friendly interfaces to access and use the infrastructure with minimal effort and basic security features.

  19. 36th ATLANTA EXECUTIVE SEMINAR

    Science.gov (United States)

    2011-04-04

    assignments as an Army Division G-4, Divisional Support Battalion Commander, Divisional Material Readiness officer, and Support Battalion Executive...Battalion; Corps Material Management Officer, Corps Support Command; Fort Hood, Texas • Jul 1991 – Jun 1994: Research Analyst, Office of Economic and...LABBLEE Corp, Raytheon, Labat-Anderson Inc., KPMG , Huber Corp, The Boeing Company, and Philadelphia Electric Company. He has also served on a

  20. Planning of activities in the Laguna Verde Central planning at 12 weeks

    International Nuclear Information System (INIS)

    Chimalpopoca, C.

    2007-01-01

    The universe of works that are carried out in a nuclear facility to maintain effective the structures, systems and components require of a continuous analysis, in the order of the maintenance frequencies that can be of the preventive, predictive or corrective type. Each component is associated to reserve parts, readiness of systems, in fulfillment to the operation technical specifications, to the environment of the one work; each component requires of a planning level, where it is distinguished with clarity when they are executed, in the operation stage, stop or recharge. This work has as end to show like the activities are planned during the operation, using planning methods to twelve weeks, where the reach of the task is conceptualized, operative requirements, of reserve parts, of the work environment analysis, of those radiological conditions, of the authorizations for their execution, the same execution and the evaluation post work like a technique to maintain in continuous improvement the tasks of the maintenance of the Units of the Power station. A motor valve to be worked in its internals requires access to the work point, it requires bill of the system, electric disconnection, maneuvers to disassemble actuators and retirement of thermal isolation if it applies, reserve parts of the caps joints, control mechanisms, personal, tools, radiological control. The success of the continuous operation of a power station is in the planning quality, the attention of each one of the details to assure that the components, structures and components stay effective to make their function when they are demanded. The planning task requires of experience and knowledge of each some of the components, the task of planning of activities and its execution is multidisciplinary This work has that purpose, to show the planning tools in the Laguna Verde Nuclear Power station, under the concept of twelve weeks. (Author)

  1. 13 CFR 108.320 - Contents of comprehensive business plan.

    Science.gov (United States)

    2010-01-01

    ... plan. 108.320 Section 108.320 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NEW MARKETS... Contents of comprehensive business plan. (a) Executive summary. The executive summary must include a... or entity, or any other firm or entity essential to the success of the Applicant's business plan. [66...

  2. Strategic Planning at a Small College--Executive Overview

    Science.gov (United States)

    Agnew, Robert

    2004-01-01

    In 1994, Baldwin-Wallace College produced a Strategic Plan for Information Technology. This plan mandated changes in the influx of technology, the structure of IT, and technology committees. The published plan included the organizational structure of the College, a SWOT analysis (strengths, weaknesses, opportunities, and threats), ten proposed…

  3. Assessment of Executive Functions in Methamphetamineaddicted Individuals: Emphasis on Duration of Addiction and Abstinence

    Directory of Open Access Journals (Sweden)

    Majid Farhadian

    2017-03-01

    Conclusion: This study revealed that although executive functions may be improved by protracted abstinence, executive dysfunctions are not completely relieved, and specific attention to planning and implementation of intervention programs are necessary.

  4. Next generation terminology infrastructure to support interprofessional care planning.

    Science.gov (United States)

    Collins, Sarah; Klinkenberg-Ramirez, Stephanie; Tsivkin, Kira; Mar, Perry L; Iskhakova, Dina; Nandigam, Hari; Samal, Lipika; Rocha, Roberto A

    2017-11-01

    Develop a prototype of an interprofessional terminology and information model infrastructure that can enable care planning applications to facilitate patient-centered care, learn care plan linkages and associations, provide decision support, and enable automated, prospective analytics. The study steps included a 3 step approach: (1) Process model and clinical scenario development, and (2) Requirements analysis, and (3) Development and validation of information and terminology models. Components of the terminology model include: Health Concerns, Goals, Decisions, Interventions, Assessments, and Evaluations. A terminology infrastructure should: (A) Include discrete care plan concepts; (B) Include sets of profession-specific concerns, decisions, and interventions; (C) Communicate rationales, anticipatory guidance, and guidelines that inform decisions among the care team; (D) Define semantic linkages across clinical events and professions; (E) Define sets of shared patient goals and sub-goals, including patient stated goals; (F) Capture evaluation toward achievement of goals. These requirements were mapped to AHRQ Care Coordination Measures Framework. This study used a constrained set of clinician-validated clinical scenarios. Terminology models for goals and decisions are unavailable in SNOMED CT, limiting the ability to evaluate these aspects of the proposed infrastructure. Defining and linking subsets of care planning concepts appears to be feasible, but also essential to model interprofessional care planning for common co-occurring conditions and chronic diseases. We recommend the creation of goal dynamics and decision concepts in SNOMED CT to further enable the necessary models. Systems with flexible terminology management infrastructure may enable intelligent decision support to identify conflicting and aligned concerns, goals, decisions, and interventions in shared care plans, ultimately decreasing documentation effort and cognitive burden for clinicians and

  5. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  6. Integrated Nuclear Security Support Plan (INSSP)

    International Nuclear Information System (INIS)

    Moore, G.M.

    2010-01-01

    Integrated Nuclear Security Support Plan (INSSP) purposes the framework for a comprehensive approach to addressing specific national security needs. It provides means for coordinating nuclear security assistance to member states. Identifies responsible parties for completion of nuclear security activities which are necessary to build sustainable nuclear security programs. International Atomic Energy Agency INSSP development process is based on findings and recommendations from a range of nuclear security missions and other information needs assessments. Takes into account of the ongoing work activities of other bilateral assistance.

  7. The Role of Decision Support in the Implementation of “Sustainable Transport” Plans

    DEFF Research Database (Denmark)

    Gudmundsson, Henrik; Ericsson, Eva; Tight, Miles

    2012-01-01

    but also the difficulty of unpicking its exact role in each case. Stockholm presented the most successful case, with a mix of academic and experience-based knowledge inputs facilitating understanding and acceptance. The cycle plan example revealed very limited influence of cycling design guidance. The UK......Improved decision support is deemed essential for the planning and implementation of sustainable transport solutions, but limited evidence exists that decision-relevant information is effectively used for these purposes. This paper applies a framework inspired by research in “knowledge utilization......” to examine to what extent various kinds of decision support are used and have become influential in three different planning situations—a local cycle plan in Copenhagen, the Stockholm congestion charging trial and the UK national transport strategy. The results reveal the extensive use of decision support...

  8. A multi-agent paradigm as structuring principle for planning support systems

    NARCIS (Netherlands)

    Saarloos, D.J.M.; Arentze, T.A.; Borgers, A.W.J.; Timmermans, H.J.P.

    2008-01-01

    Although urban plans may appear simple once completed, they are the outcomes of a highly complex decision-making process. This complexity makes it difficult to develop Planning Support Systems (PSS) that are comprehensive, flexible, intelligent and, yet, understandable to users. Great improvements

  9. Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-02-01

    This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projects (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public

  10. Robustness via Run-Time Adaptation of Contingent Plans

    Science.gov (United States)

    Bresina, John L.; Washington, Richard; Norvig, Peter (Technical Monitor)

    2000-01-01

    In this paper, we discuss our approach to making the behavior of planetary rovers more robust for the purpose of increased productivity. Due to the inherent uncertainty in rover exploration, the traditional approach to rover control is conservative, limiting the autonomous operation of the rover and sacrificing performance for safety. Our objective is to increase the science productivity possible within a single uplink by allowing the rover's behavior to be specified with flexible, contingent plans and by employing dynamic plan adaptation during execution. We have deployed a system exhibiting flexible, contingent execution; this paper concentrates on our ongoing efforts on plan adaptation, Plans can be revised in two ways: plan steps may be deleted, with execution continuing with the plan suffix; and the current plan may be merged with an "alternate plan" from an on-board library. The plan revision action is chosen to maximize the expected utility of the plan. Plan merging and action deletion constitute a more conservative general-purpose planning system; in return, our approach is more efficient and more easily verified, two important criteria for deployed rovers.

  11. An algorithmic interactive planning framework in support of sustainable technologies

    Science.gov (United States)

    Prica, Marija D.

    This thesis addresses the difficult problem of generation expansion planning that employs the most effective technologies in today's changing electric energy industry. The electrical energy industry, in both the industrialized world and in developing countries, is experiencing transformation in a number of different ways. This transformation is driven by major technological breakthroughs (such as the influx of unconventional smaller-scale resources), by industry restructuring, changing environmental objectives, and the ultimate threat of resource scarcity. This thesis proposes a possible planning framework in support of sustainable technologies where sustainability is viewed as a mix of multiple attributes ranging from reliability and environmental impact to short- and long-term efficiency. The idea of centralized peak-load pricing, which accounts for the tradeoffs between cumulative operational effects and the cost of new investments, is the key concept in support of long-term planning in the changing industry. To start with, an interactive planning framework for generation expansion is posed as a distributed decision-making model. In order to reconcile the distributed sub-objectives of different decision makers with system-wide sustainability objectives, a new concept of distributed interactive peak load pricing is proposed. To be able to make the right decisions, the decision makers must have sufficient information about the estimated long-term electricity prices. The sub-objectives of power plant owners and load-serving entities are profit maximization. Optimized long-term expansion plans based on predicted electricity prices are communicated to the system-wide planning authority as long-run bids. The long-term expansion bids are cleared by the coordinating planner so that the system-wide long-term performance criteria are satisfied. The interactions between generation owners and the coordinating planning authority are repeated annually. We view the proposed

  12. Designing a Professional Development Plan for the Support Operations Officer of the Forward Support Company

    National Research Council Canada - National Science Library

    Zimmerman, Edward

    1999-01-01

    .... Based on these responsibilities, the research question (Does the Army need to design a specific professional development plan to train CSS lieutenants to serve as support operations officers in the FSC...

  13. Decision support software technology demonstration plan

    Energy Technology Data Exchange (ETDEWEB)

    SULLIVAN,T.; ARMSTRONG,A.

    1998-09-01

    The performance evaluation of innovative and alternative environmental technologies is an integral part of the US Environmental Protection Agency's (EPA) mission. Early efforts focused on evaluating technologies that supported the implementation of the Clean Air and Clean Water Acts. In 1986 the Agency began to demonstrate and evaluate the cost and performance of remediation and monitoring technologies under the Superfund Innovative Technology Evaluation (SITE) program (in response to the mandate in the Superfund Amendments and Reauthorization Act of 1986 (SARA)). In 1990, the US Technology Policy was announced. This policy placed a renewed emphasis on making the best use of technology in achieving the national goals of improved quality of life for all Americans, continued economic growth, and national security. In the spirit of the technology policy, the Agency began to direct a portion of its resources toward the promotion, recognition, acceptance, and use of US-developed innovative environmental technologies both domestically and abroad. Decision Support Software (DSS) packages integrate environmental data and simulation models into a framework for making site characterization, monitoring, and cleanup decisions. To limit the scope which will be addressed in this demonstration, three endpoints have been selected for evaluation: Visualization; Sample Optimization; and Cost/Benefit Analysis. Five topics are covered in this report: the objectives of the demonstration; the elements of the demonstration plan; an overview of the Site Characterization and Monitoring Technology Pilot; an overview of the technology verification process; and the purpose of this demonstration plan.

  14. The Role of Social Support and Self-efficacy for Planning Fruit and Vegetable Intake.

    Science.gov (United States)

    Zhou, Guangyu; Gan, Yiqun; Hamilton, Kyra; Schwarzer, Ralf

    2017-02-01

    The aim of the current study was to examine the joint effect of self-efficacy, action planning, and received social support on fruit and vegetable intake. The study used a longitudinal design with 3 waves of data collection. Major university campus in Beijing, China. Young adults (n = 286). Age, gender, body mass index, dietary self-efficacy, and baseline behavior were measured at time 1. Two weeks after time 1, received social support and action planning were assessed (time 2); 4 weeks after time 1, subsequent fruit and vegetable consumption was measured (time 3). In a path analysis, action planning at time 2 was specified as a mediator between self-efficacy at time 1 and fruit and vegetable intake at time 3, controlling for age, gender, body mass index, and baseline behavior. In addition, in a conditional process analysis, received social support at time 2 was specified as a moderator of the self-efficacy-planning relationship. Action planning mediated between self-efficacy and subsequent dietary behavior, and received social support moderated between self-efficacy and planning supporting a compensation effect. Action planning served as a proximal predictor of fruit and vegetable intake, and planning one's consumption was facilitated by dietary self-efficacy. Through the identification of social cognitive factors influencing dietary planning, interventions can target self-efficacy and received social support to test the efficacy of these mechanisms in increasing individuals' ability to ensure they consume adequate amounts of fruits and vegetables. Copyright © 2016 Society for Nutrition Education and Behavior. Published by Elsevier Inc. All rights reserved.

  15. Supporting Pre-Service Teachers in Designing Technology-Infused Lesson Plans

    Science.gov (United States)

    Janssen, N.; Lazonder, A. W.

    2016-01-01

    The present study compared the effectiveness of two types of just-in-time support for lesson planning. Both types contained the same technological information but differed regarding pedagogical and content information. The first type presented this information separately (i.e., separate support); the second type presented this information in an…

  16. BPELPower—A BPEL execution engine for geospatial web services

    Science.gov (United States)

    Yu, Genong (Eugene); Zhao, Peisheng; Di, Liping; Chen, Aijun; Deng, Meixia; Bai, Yuqi

    2012-10-01

    The Business Process Execution Language (BPEL) has become a popular choice for orchestrating and executing workflows in the Web environment. As one special kind of scientific workflow, geospatial Web processing workflows are data-intensive, deal with complex structures in data and geographic features, and execute automatically with limited human intervention. To enable the proper execution and coordination of geospatial workflows, a specially enhanced BPEL execution engine is required. BPELPower was designed, developed, and implemented as a generic BPEL execution engine with enhancements for executing geospatial workflows. The enhancements are especially in its capabilities in handling Geography Markup Language (GML) and standard geospatial Web services, such as the Web Processing Service (WPS) and the Web Feature Service (WFS). BPELPower has been used in several demonstrations over the decade. Two scenarios were discussed in detail to demonstrate the capabilities of BPELPower. That study showed a standard-compliant, Web-based approach for properly supporting geospatial processing, with the only enhancement at the implementation level. Pattern-based evaluation and performance improvement of the engine are discussed: BPELPower directly supports 22 workflow control patterns and 17 workflow data patterns. In the future, the engine will be enhanced with high performance parallel processing and broad Web paradigms.

  17. Evacuation planning for Lilco's Shoreham plant

    International Nuclear Information System (INIS)

    Zorpette, G.

    1987-01-01

    This article reports that the Shoreham Nuclear Power Station, an 820-megawatt boiling-water reactor built by the Long Island Lighting Co., has taken 19 years to build and has so far cost nearly $5 billion. Because no emergency plan for coping with a major accident has been approved by the U.S. Nuclear Regulatory Commission, the plant has not been issued a Federal license to operate at full power. The cause of this impasse is the refusal of New York State and Suffolk County to participate in any emergency plan, on the ground that the geography of Long Island would make such a plan impossible to execute. The regulatory commission's rules require the operator of a nuclear plant to enlist cooperation from state and local authorities in an emergency plan. Shoreham's supporters charge that state and county are exploiting that requirement to block operation of the politically unpopular plant

  18. Training Community Modeling and Simulation Business Plan, 2007 Edition. Volume 2: Data Call Responses and Analysis

    Science.gov (United States)

    2009-02-01

    services; and • Other reconstruction assistance. D-14 17. Train Forces on Military Assistance to Civil Authorities ( MACA ) Develop environments...for training in the planning and execution of MACA in support of disaster relief (natural and man-made), military assistance for civil disturbances

  19. Executable Architecture Research at Old Dominion University

    Science.gov (United States)

    Tolk, Andreas; Shuman, Edwin A.; Garcia, Johnny J.

    2011-01-01

    Executable Architectures allow the evaluation of system architectures not only regarding their static, but also their dynamic behavior. However, the systems engineering community do not agree on a common formal specification of executable architectures. To close this gap and identify necessary elements of an executable architecture, a modeling language, and a modeling formalism is topic of ongoing PhD research. In addition, systems are generally defined and applied in an operational context to provide capabilities and enable missions. To maximize the benefits of executable architectures, a second PhD effort introduces the idea of creating an executable context in addition to the executable architecture. The results move the validation of architectures from the current information domain into the knowledge domain and improve the reliability of such validation efforts. The paper presents research and results of both doctoral research efforts and puts them into a common context of state-of-the-art of systems engineering methods supporting more agility.

  20. Systems autonomy technology: Executive summary and program plan

    Science.gov (United States)

    Bull, John S (Editor)

    1987-01-01

    The National Space Strategy approved by the President and Congress in 1984 sets for NASA a major goal of conducting effective and productive space applications and technology programs which contribute materially toward United States leadership and security. To contribute to this goal, OAST supports the Nation's civil and defense space programs and overall economic growth. OAST objectives are to ensure timely provision of new concepts and advanced technologies, to support both the development of NASA missions in space and the space activities of industry and other organizations, to utilize the strengths of universities in conducting the NASA space research and technology program, and to maintain the NASA centers in positions of strength in critical space technology areas. In line with these objectives, NASA has established a new program in space automation and robotics that will result in the development and transfer and automation technology to increase the capabilities, productivity, and safety of NASA space programs including the Space Station, automated space platforms, lunar bases, Mars missions, and other deep space ventures. The NASA/OAST Automation and Robotics program is divided into two parts. Ames Research Center has the lead role in developing and demonstrating System Autonomy capabilities for space systems that need to make their own decisions and do their own planning. The Jet Propulsion Laboratory has the lead role for Telerobotics (that portion of the program that has a strong human operator component in the control loop and some remote handling requirement in space). This program is intended to be a working document for NASA Headquarters, Program Offices, and implementing Project Management.

  1. Investigating executive functions in children with severe speech and movement disorders using structured tasks.

    Science.gov (United States)

    Stadskleiv, Kristine; von Tetzchner, Stephen; Batorowicz, Beata; van Balkom, Hans; Dahlgren-Sandberg, Annika; Renner, Gregor

    2014-01-01

    Executive functions are the basis for goal-directed activity and include planning, monitoring, and inhibition, and language seems to play a role in the development of these functions. There is a tradition of studying executive function in both typical and atypical populations, and the present study investigates executive functions in children with severe speech and motor impairments who are communicating using communication aids with graphic symbols, letters, and/or words. There are few neuropsychological studies of children in this group and little is known about their cognitive functioning, including executive functions. It was hypothesized that aided communication would tax executive functions more than speech. Twenty-nine children using communication aids and 27 naturally speaking children participated. Structured tasks resembling everyday activities, where the action goals had to be reached through communication with a partner, were used to get information about executive functions. The children (a) directed the partner to perform actions like building a Lego tower from a model the partner could not see and (b) gave information about an object without naming it to a person who had to guess what object it was. The executive functions of planning, monitoring, and impulse control were coded from the children's on-task behavior. Both groups solved most of the tasks correctly, indicating that aided communicators are able to use language to direct another person to do a complex set of actions. Planning and lack of impulsivity was positively related to task success in both groups. The aided group completed significantly fewer tasks, spent longer time and showed more variation in performance than the comparison group. The aided communicators scored lower on planning and showed more impulsivity than the comparison group, while both groups showed an equal degree of monitoring of the work progress. The results are consistent with the hypothesis that aided language tax

  2. Eficienţa economică a programării şi urmăririi automate a lucrărilor în execuţia drumurilor forestiere. [Economic efficiency of automatic planning and control of works in the execution of forest roads

    Directory of Open Access Journals (Sweden)

    Bereziuc R

    2003-07-01

    Full Text Available The paper presents the prospect of forest roads network system development and examines the actual management of theirs execution. We suggest the extension of automatic planning and control with addition of specific charts. The research showed that, in contrast with actual methods, automatic planning may guides to economic efficiency, regarding manual and mechanized labour – with 30 % reduction in execution time and a 35 % cut in cost

  3. Seeing the talker's face supports executive processing of speech in steady state noise.

    Science.gov (United States)

    Mishra, Sushmit; Lunner, Thomas; Stenfelt, Stefan; Rönnberg, Jerker; Rudner, Mary

    2013-01-01

    Listening to speech in noise depletes cognitive resources, affecting speech processing. The present study investigated how remaining resources or cognitive spare capacity (CSC) can be deployed by young adults with normal hearing. We administered a test of CSC (CSCT; Mishra et al., 2013) along with a battery of established cognitive tests to 20 participants with normal hearing. In the CSCT, lists of two-digit numbers were presented with and without visual cues in quiet, as well as in steady-state and speech-like noise at a high intelligibility level. In low load conditions, two numbers were recalled according to instructions inducing executive processing (updating, inhibition) and in high load conditions the participants were additionally instructed to recall one extra number, which was the always the first item in the list. In line with previous findings, results showed that CSC was sensitive to memory load and executive function but generally not related to working memory capacity (WMC). Furthermore, CSCT scores in quiet were lowered by visual cues, probably due to distraction. In steady-state noise, the presence of visual cues improved CSCT scores, probably by enabling better encoding. Contrary to our expectation, CSCT performance was disrupted more in steady-state than speech-like noise, although only without visual cues, possibly because selective attention could be used to ignore the speech-like background and provide an enriched representation of target items in working memory similar to that obtained in quiet. This interpretation is supported by a consistent association between CSCT scores and updating skills.

  4. Automating Space Station operations planning

    Science.gov (United States)

    Ziemer, Kathleen A.

    1989-01-01

    The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.

  5. Healthcare. Executive Summary

    Science.gov (United States)

    Carnevale, Anthony P.; Smith, Nicole; Gulish, Artem; Beach, Bennett H.

    2012-01-01

    This executive summary highlights several findings about healthcare. These are: (1) Healthcare is 18 percent of the U.S. economy, twice as high as in other countries; (2) There are two labor markets in healthcare: high-skill, high-wage professional and technical jobs and low-skill, low-wage support jobs; (3) Demand for postsecondary education in…

  6. Metacognitive Monitoring of Executive Control Engagement during Childhood

    Science.gov (United States)

    Chevalier, Nicolas; Blaye, Agnès

    2016-01-01

    Emerging executive control supports greater autonomy and increasingly adaptive behavior during childhood. The present study addressed whether children's greater monitoring of how they engage control drives executive control development. Gaze position was recorded while twenty-five 6-year-olds and twenty-eight 10-year-olds performed a self-paced…

  7. Elements of implant-supported rehabilitation planning in patients with bruxism.

    Science.gov (United States)

    Sarmento, Hugo Ramalho; Dantas, Raquel Venâncio Fernandes; Pereira-Cenci, Tatiana; Faot, Fernanda

    2012-11-01

    The rehabilitation of partial or completely edentulous patients with implant-supported prostheses has been widely used, achieving high success rates. However, many studies consider the presence of bruxism as a contraindication for this treatment modality. The purpose of this study was to revise the literature and identify risk factors in implant-supported rehabilitation planning in subjects with bruxism. Available literature was searched through Medline, with no time limit, including only studies in English. Topics discussed were etiology of bruxism and its implications on dental implants, biomechanical considerations regarding the overload on dental implants, and methods to prevent the occurrence of overloads in implant-supported prostheses. The rehabilitation of bruxers using implant-supported prostheses, using implants with adequate length and diameter, as well as proper positioning seems to be a reliable treatment, with reduced risks of failure. Bruxism control through the use of a nightguard by rigid occlusal stabilization appliance relieved in the region of implants is highly indicated. Although it is clear that implant-supported rehabilitation of patients with bruxism requires adequate planning and follow-up, well-designed randomized controlled trials are needed to provide reliable evidence on the long-term success of this treatment modality.

  8. Hanford site pollution prevention plan progress report, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Kirkendall, J.R.

    1996-08-26

    This report tracks progress made during 1995 against the goals stated in DOE/RL-92-62, Executive Summary, Hanford Site Pollution Prevention Plan. The Executive Summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, Executive Summary, and the progress reports are elements of a pollution prevention planning program that is required by WAC 173-307,`Plans,` for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement RCW 70.95C, `Waste Reduction,` an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the in- process reuse or reclamation of valuable spent material.

  9. HTI retrieval demonstration project execution plan

    International Nuclear Information System (INIS)

    Ellingson, D.R.

    1997-01-01

    This plan describes the process for demonstrating the retrieval of difficult Hanford tank waste forms utilizing commercial technologies and the private sector to conduct the operations. The demonstration is to be conducted in Tank 241-C-106

  10. Geospatial analysis platform: Supporting strategic spatial analysis and planning

    CSIR Research Space (South Africa)

    Naude, A

    2008-11-01

    Full Text Available Whilst there have been rapid advances in satellite imagery and related fine resolution mapping and web-based interfaces (e.g. Google Earth), the development of capabilities for strategic spatial analysis and planning support has lagged behind...

  11. An empirical analysis of executive behaviour with hospital executive information systems in Taiwan.

    Science.gov (United States)

    Huang, Wei-Min

    2013-01-01

    Existing health information systems largely only support the daily operations of a medical centre, and are unable to generate the information required by executives for decision-making. Building on past research concerning information retrieval behaviour and learning through mental models, this study examines the use of information systems by hospital executives in medical centres. It uses a structural equation model to help find ways hospital executives might use information systems more effectively. The results show that computer self-efficacy directly affects the maintenance of mental models, and that system characteristics directly impact learning styles and information retrieval behaviour. Other results include the significant impact of perceived environmental uncertainty on scan searches; information retrieval behaviour and focused searches on mental models and perceived efficiency; scan searches on mental model building; learning styles and model building on perceived efficiency; and finally the impact of mental model maintenance on perceived efficiency and effectiveness.

  12. Hanford Site Environment Safety and Health (ES and H) FY 1999 and FY 2000 Execution Commitment Summary

    Energy Technology Data Exchange (ETDEWEB)

    REEP, I.E.

    1999-12-01

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the S&H resources that support these activities. The fiscal year (FY) 1999 and 2000 information (Sieracki 1999) and data contained in the ''Hanford Site Environment, Safety and Health Fiscal Year 2001 Budget-Risk Management Summary'' (RL 1999) were the basis for preparing this report. Fiscal year 2000 finding of Office of Environmental Management (EM) and Office of Nuclear Energy, Science and Technology (NE) activities is based on the President's budget of $1,065.1 million and $28.0 million, plus $2.7 million carryover finding, respectively, as of October 31, 1999. Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2002 ES&H Budget-Risk Management Summary to be issued in May 2000. This report provides the end-of-year status of FY 1999 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2000 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H ''Guidance for FY200l Budget Formulations and Execution'' (DOE 1999).

  13. Building oceanographic and atmospheric observation networks by composition: unmanned vehicles, communication networks, and planning and execution control frameworks

    Science.gov (United States)

    Sousa, J. T.; Pinto, J.; Martins, R.; Costa, M.; Ferreira, F.; Gomes, R.

    2014-12-01

    The problem of developing mobile oceanographic and atmospheric observation networks (MOAO) with coordinated air and ocean vehicles is discussed in the framework of the communications and control software tool chain developed at Underwater Systems and Technologies Laboratory (LSTS) from Porto University. This is done with reference to field experiments to illustrate key capabilities and to assess future MOAO operations. First, the motivation for building MOAO by "composition" of air and ocean vehicles, communication networks, and planning and execution control frameworks is discussed - in networked vehicle systems information and commands are exchanged among multiple vehicles and operators, and the roles, relative positions, and dependencies of these vehicles and operators change during operations. Second, the planning and execution control framework developed at LSTS for multi-vehicle systems is discussed with reference to key concepts such as autonomy, mixed-initiative interactions, and layered organization. Third, the LSTS tool software tool chain is presented to show how to develop MOAO by composition. The tool chain comprises the Neptus command and control framework for mixed initiative interactions, the underlying IMC messaging protocol, and the DUNE on-board software. Fourth, selected LSTS operational deployments illustrate MOAO capability building. In 2012 we demonstrated the use of UAS to "ferry" data from UUVs located beyond line of sight (BLOS). In 2013 we demonstrated coordinated observations of coastal fronts with small UAS and UUVs, "bent" BLOS through the use of UAS as communication relays, and UAS tracking of juvenile hammer-head sharks. In 2014 we demonstrated UUV adaptive sampling with the closed loop controller of the UUV residing on a UAS; this was done with the help of a Wave Glider ASV with a communications gateway. The results from these experiments provide a background for assessing potential future UAS operations in a compositional MOAO.

  14. Planning and support materials in teaching story comprehension from the interbehavioral approach

    Directory of Open Access Journals (Sweden)

    Ana Cristina Mascareño Bórquez

    2017-12-01

    Full Text Available Despite the latest changes in educational reforms within the country, curriculum plans and ongoing program renewals aimed at resolving the educational gap reflected in national statistics, the results remain unfavorable. This leads to reflection and analysis to generate and implement new forms and teaching strategies. The purpose of this paper is to present the design of an alternative proposal for planning and the development of support materials, developed according to the second block of sixth grade primary education, in two expected learning contained in the formal basic education curriculum. Centered on the interaction in teaching-learning and according to different levels of functional aptitude. Subsequently it underwent a process of piloting and revision by experts to prove the pertinence of the planning and precisions for its implementation. As results, the support materials and the planning proposal are presented and discussed with the authors who have worked on planning proposals from the inter-behavioral approach.

  15. Development and Application of a Planning Support System for Regional Spatial Functional Zoning Based on GIS

    Directory of Open Access Journals (Sweden)

    Xiaorui Zhang

    2016-09-01

    Full Text Available Regional spatial functional zoning in China is a large-scale strategic planning and requires very advanced planning decision support technology. With respect to spatial functional zoning, the planning support system (PSS is introduced as one of the most popular computer aided planning systems at the present time in this paper, and is further explained with the example of the latest regional main functional area (RMFA planning in China. On the Visual Studio.NET visualization development platform, the planning decision model, planning decision method, and GIS are organically integrated and customized by using the component-type secondary development technology of the ArcGIS Engine with the development language VB.NET. Hence, a highly efficient and flexible planning support system of regional main functional areas (RMFA-PSS is established. It was adopted in the research of the Beijing–Tianjin area in China and accordingly two types of main functional area planning are acquired. The RMFA-PSS offers an efficient and flexible decision support with regard to RMFA planning. The research can provide a reference for further PSS development and applications related to other types of spatial functional zoning.

  16. Executive functions and predicting the onset of drinking and heavy drinking in young adolescents

    NARCIS (Netherlands)

    Peeters, M.; Janssen, T.; Monshouwer, K.; Boendermaker, W.; Pronk, T.; Wiers, R.; Vollebergh, W.

    2016-01-01

    Background: Executive functioning (EF) has repeatedly been associated with the use and misuse of alcohol and other substances in adolescence. Impairments in executive functions, such as response inhibition and working memory, important for organizing, controlling and planning of behavior have been

  17. Early development of executive functions: a differential study

    Directory of Open Access Journals (Sweden)

    Sylvia Sastre-Riba

    2015-05-01

    Full Text Available The ontogeny of executive functions is essential in explaining differential and normative developmental trends. Executive functions must be studied from an early age given their consequential effects on mental flexibility, monitoring information, planning, and cognitive control. We propose a differential study in alternative developmental courses through observing typical babies, Down syndrome babies, and babies with risk-factors at birth (due to low weight or to congenital hypothyroidism. Applymg Systematic Observational Methodology, spontaneous babies' activity was registered. The results indicated that: a Typical babies showed better shifting and action flexibility in order to obtain a goal, thus better results; b Among the higher risk-babies, the lower efficacy in executive functioning was observed in underweight babies. Those with hypothyroidism were more in line with the typical babies; c Underweight babies showed a good level of combining actions but they obtained inferior results; d Down syndrome babies displayed more executive functioning difficulty, lower flexibility, high perseveration and less error detection.

  18. Development and verification for review plan of emergency action level (EAL)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    Emergency action levels (EALs) are used as the trigger in order to implement the precautionary protective actions at the nuclear emergency. In this study the framework for applying the EAL in Japan and the process for developing the review plan, such as procedures to review the basis of EAL submitted by the licensee, have been investigated based on the survey for EAL review executed in the United States. In addition, issues to reflect the EAL framework in enhancement of the local government emergency planning and emergency response support system have been investigated. (author)

  19. The effect of deep brain stimulation of the subthalamic nucleus on executive functions: impaired verbal fluency and intact updating, planning and conflict resolution in Parkinson's disease.

    Science.gov (United States)

    Demeter, Gyula; Valálik, István; Pajkossy, Péter; Szőllősi, Ágnes; Lukács, Ágnes; Kemény, Ferenc; Racsmány, Mihály

    2017-04-24

    Although the improvement of motor symptoms in Parkinson's disease (PD) after deep brain stimulation (DBS) of the subthalamic nucleus (STN) is well documented, there are open questions regarding its impact on cognitive functions. The aim of this study was to assess the effect of bilateral DBS of the STN on executive functions in PD patients using a DBS wait-listed PD control group. Ten PD patients with DBS implantation (DBS group) and ten PD wait-listed patients (Clinical control group) participated in the study. Neuropsychological tasks were used to assess general mental ability and various executive functions. Each task was administered twice to each participant: before and after surgery (with the stimulators on) in the DBS group and with a matched delay between the two task administration points in the control group. There was no significant difference between the DBS and the control groups' performance in tasks measuring the updating of verbal, spatial or visual information (Digit span, Corsi and N-back tasks), planning and shifting (Trail Making B), and conflict resolution (Stroop task). However, the DBS group showed a significant decline on the semantic verbal fluency task after surgery compared to the control group, which is in line with findings of previous studies. Our results provide support for the relative cognitive safety of the STN DBS using a wait-listed PD control group. Differential effects of the STN DBS on frontostriatal networks are discussed. Copyright © 2017 Elsevier B.V. All rights reserved.

  20. Mismanagement Reasons of the Projects Execution Phase

    Directory of Open Access Journals (Sweden)

    Hatem Khaleefah Al-Agele

    2017-10-01

    Full Text Available The execution phase of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts., in order to find the real reasons behind mismanagement of the execution phase. The most important reasons which are negatively impact on management of the execution phase that proven by the study were (Inability of company to meet project requirements because it's specialized and / or large project, Multiple sources of decision and overlap in powers, Inadequate planning, Inaccurate estimation of cost, Delayed cash flows by owners, Poor performance of project manager, inefficient decision making process, and the Negative impact of people in the project area. Finally, submitting a set of recommendations which will contribute to overcome the obstructions of successful management of the execution phase.

  1. Disruption management - operations research between planning and execution

    DEFF Research Database (Denmark)

    Clausen, Jens; Larsen, Jesper; Larsen, Allan

    2001-01-01

    For a large number of applications Operations Research has a proven track record: it can deliver high quality solutions for planning problems. Important examples can be found in the airline industry, logistics and production management. This report will describe real-world examples of a novel way...... of applying Operations Research: As plans have to be adjusted to take last minute changes into consideration, OR can play an active role in such a situation by producing, maybe even in a pro-actively role, alternative plans. This type of activity is called Disruption Management....

  2. A Sales Execution Strategy Guide for Technology Startups

    Directory of Open Access Journals (Sweden)

    Ian Gilbert

    2011-10-01

    Full Text Available The majority of startups fail to consider sales execution as part of their overall strategy. This article demonstrates how a sales execution strategy can help a company take a product or service to market more efficiently and effectively by focusing on the customers that are key to generating revenue. Combined with techniques for recruiting effectively and measuring sales outcomes, a sales execution strategy helps technology startups exceed growth aspirations and potentially reduce or even eliminate the requirement for external investment. In this article, we first describe the focus of assistance currently given to startups and the reasons why sales execution strategies are often overlooked. Next, we outline recommendations for developing, implementing, and supporting a sales execution strategy. Finally, we summarize the key points presented in the article.

  3. Software development to support decommissioning and waste management strategic planning

    International Nuclear Information System (INIS)

    Williams, John; Warneford, Ian; Harrison, J.

    1997-01-01

    One of the components of the UKAEA's mission is to care for and, at the appropriate time, safely dismantle its radioactive facilities which are no longer in use. To assist in the development of an optimised strategy, AEA Technology was commissioned to produce decision support software. This paper describes the background to the development of the software, its key features and current status, and the lessons learnt during the development. The software, known as UKAEA SPS (Strategic Planning System), is a unique support software package that has been developed to assist in the planning of decommissioning and radioactive waste management. SPS models linked decommissioning and waste management strategies covering all of UKAEA's nuclear liabilities. It has been developed around the database package ACCESS, and runs on Pentium PCs; however, it has many of the features of project planning systems. Its principal outputs are costs, timings and utilisation data for the waste stores, processing facilities, transport and disposal operations displayed at any level of aggregation. This allows programme managers to see easily the effects of changing key parameters in a strategy under development. (author)

  4. Model Development and Process Analysis for Lean Cellular Design Planning in Aerospace Assembly and Manufacturing

    Science.gov (United States)

    Hilburn, Monty D.

    Successful lean manufacturing and cellular manufacturing execution relies upon a foundation of leadership commitment and strategic planning built upon solid data and robust analysis. The problem for this study was to create and employ a simple lean transformation planning model and review process that could be used to identify functional support staff resources required to plan and execute lean manufacturing cells within aerospace assembly and manufacturing sites. The lean planning model was developed using available literature for lean manufacturing kaizen best practices and validated through a Delphi panel of lean experts. The resulting model and a standardized review process were used to assess the state of lean transformation planning at five sites of an international aerospace manufacturing and assembly company. The results of the three day, on-site review were compared with baseline plans collected from each of the five sites to determine if there analyzed, with focus on three critical areas of lean planning: the number and type of manufacturing cells identified, the number, type, and duration of planned lean and continuous kaizen events, and the quantity and type of functional staffing resources planned to support the kaizen schedule. Summarized data of the baseline and on-site reviews was analyzed with descriptive statistics. ANOVAs and paired-t tests at 95% significance level were conducted on the means of data sets to determine if null hypotheses related to cell, kaizen event, and support resources could be rejected. The results of the research found significant differences between lean transformation plans developed by site leadership and plans developed utilizing the structured, on-site review process and lean transformation planning model. The null hypothesis that there was no difference between the means of pre-review and on-site cell counts was rejected, as was the null hypothesis that there was no significant difference in kaizen event plans. These

  5. A Decision Support System for Ship Maintenance Capacity Planning

    NARCIS (Netherlands)

    de Boer, R.; Schutten, Johannes M.J.; Zijm, Willem H.M.

    1997-01-01

    In this paper, the basic framework and algorithms of a decision support system are discussed, which enhance process and capacity planning at a large repair shop. The research is strongly motivated by experiences in a project carried out at a dockyard, which performs repair, overhaul and modification

  6. Planning and User Interface Affordances

    National Research Council Canada - National Science Library

    St. Amant, Robert

    1999-01-01

    .... We identify a number of similarities between executing plans and interacting with a graphical user interface, and argue that affordances for planning environments apply equally well to user interface environments...

  7. An Investigation of Executive Functioning in Pediatric Anxiety.

    Science.gov (United States)

    Murphy, Yolanda E; Luke, Anna; Brennan, Elle; Francazio, Sarah; Christopher, Isabella; Flessner, Christopher A

    2018-01-01

    Although science's understanding (e.g., etiology, maintaining factors, etc.) of pediatric anxiety and related problems has grown substantially over recent years, several aspects to anxiety in youths remain elusive, particularly with relation to executive functioning. To this end, the current study sought to examine several facets to executive functioning (i.e., cognitive flexibility, inhibition, planning, working memory) within a transdiagnostic sample of youths exhibiting varying degrees of anxiety symptoms. One hundred six youths completed a comprehensive battery, including several self-report measures (e.g., Multidimensional Anxiety Scale for Children [MASC] or MASC-2) and an automated neurocognitive battery of several executive functioning tasks (Intradimensional/Extradimensional [IDED], Stop Signal [SST], Spatial Span [SSP], Stockings of Cambridge [SOC] tasks). Regression analyses indicated that youths exhibiting marked anxiety symptoms demonstrated increased planning time and probability of inhibition compared with youths with minimal or no anxiety symptoms. Youths with marked anxiety symptoms similarly demonstrated better cognitive flexibility (i.e., set shifting) compared with youths with minimal anxiety. In addition, analyses indicated a trend such that youths exhibiting marked anxiety symptoms demonstrated poorer working memory compared with youths with no anxiety symptoms. Group classification did not predict remaining outcomes. Limitations and future areas of research are discussed.

  8. US country studies program: Support for climate change studies, national plans, and technology assessments

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This paper describes the objectives of the next phase of the U.S. Country Studies Program which was launched in support of the Framework Convention on Climate Change (FCCC). The next phases of this program aim to: assist countries in preparing Climate Change Action plans; support technology assessments and development of technology initiatives; enhance exchange of information and expertise in support of FCCC. The program offers support for these processes in the form of handbooks which have been published to aid in preparing action plans, and to provide information on methane, forestry, and energy technologies. In addition an array of training workshops have been and are scheduled to offer hands on instruction to participants, expert advice is available from trained personnel, and modeling tools are available to aid in development of action plans.

  9. Financial services FY 1995 site support program plan WBS 6.10.4

    Energy Technology Data Exchange (ETDEWEB)

    Vodney, E.P.

    1994-09-01

    This is the signed Financial Service fiscal year 1995 Site Support Program Plan, Work Breakdown Structure 6.10.4, for the Hanford site. This plan is intended to enable the contractor to accomplish the following: ensure financial integrity in all Westinghouse Hanford Company (WHC) operation while supporting the programmatic activities of WHC, the US Department of Energy, Richland Operations Office, and other Hanford contractors; provide efficient and effective financial services, and value added audits and review that enable management to enhance future operational results.

  10. Relating self reports of writing behaviour and online task execution using a temporal model

    NARCIS (Netherlands)

    Tillema, M.; van den Bergh, H.; Rijlaarsdam, G.; Sanders, T.

    2011-01-01

    Current theory about writing states that the quality of (meta)cognitive processing (i.e. planning, text production, revising, et cetera) is, at least partly, determined by the temporal distribution of (meta)cognitive activities across task execution. Put simply, the quality of task execution is

  11. Mandatory IFRS adoption and executive compensation: Evidence from China

    Directory of Open Access Journals (Sweden)

    Qingchuan Hou

    2014-03-01

    Full Text Available This study investigates how the mandatory adoption of International Financial Reporting Standards (IFRS affects the contractual benefits of using accounting information to determine executive compensation in China. After controlling for firm and corporate governance characteristics, we find strong evidence supporting the positive role of mandatory IFRS adoption on the accounting-based performance sensitivity of executive compensation. Subsample analysis suggests that improvements in accounting-based performance sensitivity after IFRS adoption differ across regions with various levels of institutional quality and across firms that are affected to a different extent by the adoption. Additional analysis supports the argument that the positive effects of IFRS adoption on the use of accounting performance in executive compensation are driven by the reduction in accounting conservatism associated with IFRS adoption.

  12. An intelligent spatial land use planning support system using socially rational agents

    NARCIS (Netherlands)

    Ghavami, S.M.; Taleai, M.; Arentze, T.A.

    2017-01-01

    This research presents an intelligent planning support system based on multi-agent systems for spatial urban land use planning. The proposed system consists of two main phases: a pre-negotiation phase and an automated negotiation phase. The pre-negotiation phase involves interaction between human

  13. Sustainable transport project evaluation and decision support: indicators and planning criteria for sustainable development

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Pryn, Marie Ridley

    2015-01-01

    is adopted. The SUSTAIN-DSS model rests upon multi-criteria decision analysis and planning workshops in order to combine the use of qualitative and quantitative assessments. This article stresses the necessity of revising current planning paradigms such as cost-benefit analysis (CBA) but also to make clear......This article will expose the necessity for a sustainable planning and decision support framework for transport infrastructure assessment. This will be operationalized through a set of planning criteria and scenario alternatives, which is assessed in the SUSTAIN decision support system (SUSTAIN......-DSS) model. A part of the decision support framework will be tested in a case study in Denmark, concerning the problem of congestion on the current bridge crossing Roskilde Fjord in the city of Frederikssund. This article suggests including in a combination both reference class forecasting and quantitative...

  14. Idaho National Laboratory Ten-Year Site Plan Project Description Document

    Energy Technology Data Exchange (ETDEWEB)

    Not Listed

    2012-03-01

    This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

  15. [Memory and the executive functions].

    Science.gov (United States)

    Tirapu-Ustárroz, J; Muñoz-Céspedes, J M

    The terms 'executive functioning' or 'executive control' refer to a set of mechanisms involved in the improvement of cognitive processes to guide them towards the resolution of complex problems. Both the frontal lobes, acting as structure, and the executive processes, acting as function, work with memory contents, operating with information placed in the diencephalic structures and in the medial temporal lobe. Generally, we can state that many works find an association between frontal damage and specific memory shortages like working memory deficit, metamemory problems, source amnesia, or difficulties in the prospective memory. This paper is a critical review of the working memory concept and proposes a new term: the attentional operative system that works with memory contents. Concerning the metamemory, the frontal lobes are essential for monitoring processes in general and for 'the feeling of knowing' kind of judgements in particular. Patients suffering prefrontal damage show serious problems to remember the information source. Thus, the information is rightly remembered but the spatiotemporal context where that information was learned has been forgotten. Finally, the prospective memory deals with remembering to make something in a particular moment in the future and performing the plan previously drawn up.

  16. Validating the Executive Personal Finance Scale with Financial Investments and Expectations in University Students.

    Science.gov (United States)

    Yang, Bijou; Lester, David

    2016-06-01

    The validity of the Executive Personal Finance Scale (EPFS) was tested in a sample of 93 undergraduate students (31 men, 62 women; M age = 20.5 years, SD = 1.3, range = 18-24). Scores on the Motivation drive, Organization, and Planning subscales of this scale were associated with having a savings account, owning bank CDs, and self-estimated knowledge about financial matters, while scores on the Impulse control and Motivational drive subscales were associated with expectations for a satisfactory retirement income. The results provide support for the validity of the EPFS. © The Author(s) 2016.

  17. Executive Functions in Individuals with Williams Syndrome

    Science.gov (United States)

    Menghini, D.; Addona, F.; Costanzo, F.; Vicari, S.

    2010-01-01

    Background: The present study was aimed at investigating working memory (WM) and executive functions capacities in individuals with Williams syndrome (WS) as compared with mental-age matched typically developing (TD) children. Method: In order to serve the study goal, a sizeable battery of tasks tapping WM as well as attention, memory, planning,…

  18. Executive skills and reading comprehension a guide for educators

    CERN Document Server

    Cartwright, Kelly B

    2015-01-01

    How do K-12 students become self-regulated learners who actively deploy comprehension strategies to make meaning from texts? This cutting-edge guide is the first book to highlight the importance of executive skills for improving reading comprehension. Chapters review the research base for particular executive functions--such as planning, organization, cognitive flexibility, and impulse control--and present practical skills-building strategies for the classroom. Detailed examples show what each skill looks like in real readers, and sidebars draw explicit connections to the Common Core State Sta

  19. Planning for and surviving a BCM audit.

    Science.gov (United States)

    Freestone, Mandy; Lee, Michael

    2008-01-01

    Business continuity management (BCM) is moving progressively higher up the agendas of boardroom executives due to growing regulator, insurer and investor interest in risk management and BCM activity. With increasing pressure across all sectors, BCM has become an integral part of any effective corporate governance framework. Boardroom executives and senior management are thus now expected to provide an appropriate level of business continuity preparedness to better protect shareholder, investor and other stakeholder interests. The purpose of this paper is to build a link across the 'chasm' that separates the auditee from the auditor. The paper attempts to illuminate understanding about the process undertaken by an auditor when reviewing the BCM process. It details the steps the BCM auditor typically undertakes, and provides practical guidance as to the types of documentation and other supporting evidence required during the process. Additionally, the paper attempts to dispel commonly-held misconceptions about the BCM audit process. Executives, senior management and BCM practitioners will all benefit from the practical guidance offered in this paper, to assist in planning for and surviving a BCM audit.

  20. Business Intelligence Support For Project Management

    OpenAIRE

    Muntean, Mihaela; Cabau, Liviu Gabiel

    2013-01-01

    With respect to the project management framework, a project live cycle consists of phases like: initiation, planning, execution, monitoring & control and closing. Monitoring implies measuring the progress and performance of the project during its execution and communicating the status. Actual performance is compared with the planned one. Therefore, a minimal set of key performance indicators will be proposed. Monitoring the schedule progress, the project budget and the scope will be possible....

  1. Acceptance Test Plan for ANSYS Software

    International Nuclear Information System (INIS)

    CREA, B.A.

    2000-01-01

    This plan governs the acceptance testing of the ANSYS software (Full Mechanical Release 5.5) for use on Project Word Management Contract (PHMC) computer systems (either UNIX or Microsoft Windows/NT). There are two phases to the acceptance testing covered by this test plan: program execution in accordance with the guidance provided in installation manuals; and ensuring results of the execution are consistent with the expected physical behavior of the system being modeled

  2. Investigating executive functions in children with severe speech and movement disorders using structured tasks

    NARCIS (Netherlands)

    Stadskleiv, K.; Tetzchner, S. von; Batorowicz, B.; Balkom, L.J.M. van; Dahlgren-Sandberg, A.; Renner, G.

    2014-01-01

    Executive functions are the basis for goal-directed activity and include planning, monitoring, and inhibition, and language seems to play a role in the development of these functions. There is a tradition of studying executive function in both typical and atypical populations, and the present study

  3. A distributed query execution engine of big attributed graphs.

    Science.gov (United States)

    Batarfi, Omar; Elshawi, Radwa; Fayoumi, Ayman; Barnawi, Ahmed; Sakr, Sherif

    2016-01-01

    A graph is a popular data model that has become pervasively used for modeling structural relationships between objects. In practice, in many real-world graphs, the graph vertices and edges need to be associated with descriptive attributes. Such type of graphs are referred to as attributed graphs. G-SPARQL has been proposed as an expressive language, with a centralized execution engine, for querying attributed graphs. G-SPARQL supports various types of graph querying operations including reachability, pattern matching and shortest path where any G-SPARQL query may include value-based predicates on the descriptive information (attributes) of the graph edges/vertices in addition to the structural predicates. In general, a main limitation of centralized systems is that their vertical scalability is always restricted by the physical limits of computer systems. This article describes the design, implementation in addition to the performance evaluation of DG-SPARQL, a distributed, hybrid and adaptive parallel execution engine of G-SPARQL queries. In this engine, the topology of the graph is distributed over the main memory of the underlying nodes while the graph data are maintained in a relational store which is replicated on the disk of each of the underlying nodes. DG-SPARQL evaluates parts of the query plan via SQL queries which are pushed to the underlying relational stores while other parts of the query plan, as necessary, are evaluated via indexless memory-based graph traversal algorithms. Our experimental evaluation shows the efficiency and the scalability of DG-SPARQL on querying massive attributed graph datasets in addition to its ability to outperform the performance of Apache Giraph, a popular distributed graph processing system, by orders of magnitudes.

  4. Fathers Matter: The Role of Father Autonomy Support and Control in Preschoolers' Executive Function Development

    Science.gov (United States)

    Meuwissen, Alyssa S.; Carlson, Stephanie M.

    2015-01-01

    Although previous work has shown that mothers' parenting influences the development of child executive function (important self-control skills developed in the preschool years) the role of fathers' parenting has not been thoroughly investigated. We observed fathers' autonomy support and control in dyadic play with their 3-year-old children (N pairs = 110), and measured father and child EF independently with laboratory tasks. We found that fathers' controlling parenting was significantly inversely related to the child EF composite, above and beyond family income and child verbal ability. These results are consistent with the hypothesis that fathers are important for the development of EF in their children, and suggest fathers should be included in both research and parenting interventions. PMID:26209884

  5. Questionnaire-based assessment of executive functioning: Psychometrics.

    Science.gov (United States)

    Castellanos, Irina; Kronenberger, William G; Pisoni, David B

    2018-01-01

    The psychometric properties of the Learning, Executive, and Attention Functioning (LEAF) scale were investigated in an outpatient clinical pediatric sample. As a part of clinical testing, the LEAF scale, which broadly measures neuropsychological abilities related to executive functioning and learning, was administered to parents of 118 children and adolescents referred for psychological testing at a pediatric psychology clinic; 85 teachers also completed LEAF scales to assess reliability across different raters and settings. Scores on neuropsychological tests of executive functioning and academic achievement were abstracted from charts. Psychometric analyses of the LEAF scale demonstrated satisfactory internal consistency, parent-teacher inter-rater reliability in the small to large effect size range, and test-retest reliability in the large effect size range, similar to values for other executive functioning checklists. Correlations between corresponding subscales on the LEAF and other behavior checklists were large, while most correlations with neuropsychological tests of executive functioning and achievement were significant but in the small to medium range. Results support the utility of the LEAF as a reliable and valid questionnaire-based assessment of delays and disturbances in executive functioning and learning. Applications and advantages of the LEAF and other questionnaire measures of executive functioning in clinical neuropsychology settings are discussed.

  6. Seeing the talker’s face supports executive processing of speech in steady state noise

    Directory of Open Access Journals (Sweden)

    Sushmit eMishra

    2013-11-01

    Full Text Available Listening to speech in noise depletes cognitive resources, affecting speech processing. The present study investigated how remaining resources or cognitive spare capacity (CSC can be deployed by young adults with normal hearing. We administered a test of CSC (CSCT, Mishra et al., 2013 along with a battery of established cognitive tests to 20 participants with normal hearing. In the CSCT, lists of two-digit numbers were presented with and without visual cues in quiet, as well as in steady-state and speech-like noise at a high intelligibility level. In low load conditions, two numbers were recalled according to instructions inducing executive processing (updating, inhibition and in high load conditions the participants were additionally instructed to recall one extra number, which was the always the first item in the list. In line with previous findings, results showed that CSC was sensitive to memory load and executive function but generally not related to working memory capacity. Furthermore, CSCT scores in quiet were lowered by visual cues, probably due to distraction. In steady-state noise, the presence of visual cues improved CSCT scores, probably by enabling better encoding. Contrary to our expectation, CSCT performance was disrupted more in steady-state than speech-like noise, although only without visual cues, possibly because selective attention could be used to ignore the speech-like background and provide an enriched representation of target items in working memory similar to that obtained in quiet. This interpretation is supported by a consistent association between CSCT scores and updating skills.

  7. Seeing the talker’s face supports executive processing of speech in steady state noise

    Science.gov (United States)

    Mishra, Sushmit; Lunner, Thomas; Stenfelt, Stefan; Rönnberg, Jerker; Rudner, Mary

    2013-01-01

    Listening to speech in noise depletes cognitive resources, affecting speech processing. The present study investigated how remaining resources or cognitive spare capacity (CSC) can be deployed by young adults with normal hearing. We administered a test of CSC (CSCT; Mishra et al., 2013) along with a battery of established cognitive tests to 20 participants with normal hearing. In the CSCT, lists of two-digit numbers were presented with and without visual cues in quiet, as well as in steady-state and speech-like noise at a high intelligibility level. In low load conditions, two numbers were recalled according to instructions inducing executive processing (updating, inhibition) and in high load conditions the participants were additionally instructed to recall one extra number, which was the always the first item in the list. In line with previous findings, results showed that CSC was sensitive to memory load and executive function but generally not related to working memory capacity (WMC). Furthermore, CSCT scores in quiet were lowered by visual cues, probably due to distraction. In steady-state noise, the presence of visual cues improved CSCT scores, probably by enabling better encoding. Contrary to our expectation, CSCT performance was disrupted more in steady-state than speech-like noise, although only without visual cues, possibly because selective attention could be used to ignore the speech-like background and provide an enriched representation of target items in working memory similar to that obtained in quiet. This interpretation is supported by a consistent association between CSCT scores and updating skills. PMID:24324411

  8. Five years program execution outcome; Bilan d'execution du plan quinquenal

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-07-01

    This document presents realized activities during five years program in mine field and petroleum (1979-1983). It involves mining and petroleum researches and mining productions. [French] Le document presente les activites realisees dans le domaine des mines et du petrole pendant les 5 annees du plan quinquenal (1979-1983). Il s'agit des recherches minieres et petrolieres et des productions minieres.

  9. Working memory assessment in schizophrenia and its correlation with executive functions ability.

    Science.gov (United States)

    Berberian, Arthur A; Trevisan, Bruna T; Moriyama, Tais S; Montiel, José M; Oliveira, José Ari C; Seabra, Alessandra G

    2009-09-01

    Working memory impairment is common in schizophrenia and is possibly a cause of multiple features of the disorder. However few studies have replicated such findings of impairment patterns in Brazilian samples. The main target of this study was to assess auditory and visual working memory in patients with schizophrenia, to assess if they work as separate systems, and to correlate working memory deficits with executive functions. Twenty subjects with schizophrenia and twenty healthy subjects matched by gender, age, and schooling have participated. The abilities assessed were auditory and visual working memory, selective attention, inhibitory control, cognitive flexibility, and planning. Patients showed declines in all measures evaluated, except for a measure reaction time of inhibitory control. Auditory working memory was correlated to selective attention, inhibition, flexibility and planning while Visual working memory to planning and flexibility. The present study suggests that working memory and executive functions deficits are present in patients with schizophrenia in the Brazilian sample evaluated. Alterations in executive functions may lead to incapacity of operation of processes of working memory. These findings may contribute to delineate and develop new strategies of schizophrenia treatment in the Brazilian population.

  10. Taxes and executive compensation: evidence from the 1990s

    Czech Academy of Sciences Publication Activity Database

    Katuščák, Peter

    2009-01-01

    Roč. 55, 3-4 (2009), s. 542-568 ISSN 1610-241X Institutional research plan: CEZ:MSM0021620846 Keywords : personal income taxation * pay-to-stock-price * executive compensation Subject RIV: AH - Economics Impact factor: 0.565, year: 2009

  11. A decision support system for strategic planning on pig farms

    OpenAIRE

    Backus, Ge B.C.; Timmer, G. Th.; Dijkhuizen, A.A.; Eidman, V.R.; Vos, F.

    1995-01-01

    This paper reported on a decision support system (DSS) for strategic planning on pig farms. The DSS was based . on a stochastic simulation model of investment decisions (ISM). ISM described a farm with one loan and one building using 23 variables. The simulation model calculated the results of a strategic plan for an individual pig farm over a time horizon of a maximum of 20 years for a given scenario. For six distinct replacement strategies, regression metamodels were specified to describe t...

  12. Decision support tools for policy and planning

    International Nuclear Information System (INIS)

    Jacyk, P.; Schultz, D.; Spangenberg, L.

    1995-01-01

    A decision support system (DSS) is being developed at the Radioactive Liquid Waste Treatment Facility, Los Alamos National Laboratory (LANL). The DSS will be used to evaluate alternatives for improving LANL's existing central radioactive waste water treatment plant and to evaluate new site-wide liquid waste treatment schemes that are required in order to handle the diverse waste streams produced at LANL. The decision support system consists of interacting modules that perform the following tasks: rigorous process simulation, configuration management, performance analysis, cost analysis, risk analysis, environmental impact assessment, transportation modeling, and local, state, and federal regulation compliance checking. Uncertainty handling techniques are used with these modules and also with a decision synthesis module which combines results from the modules listed above. We believe the DSS being developed can be applied to almost any other industrial water treatment facility with little modification because in most situations the waste streams are less complex, fewer regulations apply, and the political environment is simpler. The techniques being developed are also generally applicable to policy and planning decision support systems in the chemical process industry

  13. A Framework to Support the Fusion of Operation and Planning

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Yousu; Etingov, Pavel V.; Fitzhenry, Erin B.; Sharma, Poorva; Nguyen, Tony B.; Makarov, Yuri V.; Rice, Mark J.; Allwardt, Craig H.; Widergren, Steven E.

    2015-12-31

    The management of the nation’s power system has progressed to the point where the boundary lines between operations and planning are becoming blurred. The dynamic behavior of smart grid technologies brings pressures of incorporating the predictive capability from planning to enhance operations. These needs are requiring a smoother, better integrated interplay between the functional roles of planning and operations. This paper presents a framework to support the fusion of operation and planning. A case study of predicting the intra-hour deficiency in generation capability and ramping capacity and presenting the outputs to operators was conducted. The study shows the benefits of the fusion and the effectiveness of the framework. All the function blocks used in the study were built upon GridOPTICS Software System (GOSS), a software system middleware platform that facilitates deployment of new applications for the future power grid.

  14. Planning and management support for NPP personnel SAT-based training programmes

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    This paper deals with planning and management support for NPP personnel SAT based training programmes based on IAEA TC Project SLR/0/003 on upgrading NPP personnel training, with the aim of upgrading NPP safety and reliability of NPP operation and maintenance. The costs needed include both Slovak and IAEA sources. Five stages of the Project are defined: planning; organizing; motivating; implementation; control, review and accountability

  15. Getting the right grasp on executive function

    Directory of Open Access Journals (Sweden)

    Claudia L R Gonzalez

    2014-04-01

    Full Text Available Executive Function (EF refers to important socio-emotional and cognitive skills that are known to be highly correlated with both academic and life success. EF is a blanket term that is considered to include self-regulation, working memory, and planning. Recent studies have shown a relationship between EF and motor control. The emergence of motor control coincides with that of EF, hence understanding the relationship between these two domains could have significant implications for early detection and remediation of later EF deficits. The purpose of the current study was to investigate this relationship in young children. This study incorporated the Behavioural Rating Inventory of Executive Function (BRIEF and two motor assessments with a focus on precision grasping to test this hypothesis. The BRIEF is comprised of two indices of EF: 1 the Behavioral Regulation Index (BRI containing three subscales: Inhibit, Shift, and Emotional Control; 2 the Metacognition Index (MI containing five subscales: Initiate, Working Memory, Plan/Organize, Organization of Materials, and Monitor. A global executive composite (GEC is derived from the two indices. In this study, right-handed children aged 5-6 and 9-10 were asked to: grasp-to-construct (Lego® models; and grasp-to-place (wooden blocks, while their parents completed the BRIEF questionnaire. Analysis of results indicated significant correlations between the strength of right hand preference for grasping and numerous elements of the BRIEF including the BRI, MI, and GEC. Specifically, the more the right hand was used for grasping the better the EF ratings. In addition, patterns of space-use correlated with the GEC in several subscales of the BRIEF. Finally and remarkably, the results also showed a reciprocal relationship between hand and space use for grasping and EF. These findings are discussed with respect to: 1 the developmental overlap of motor and executive functions; 2 detection of EF deficits through

  16. NIH EXAMINER: conceptualization and development of an executive function battery.

    Science.gov (United States)

    Kramer, Joel H; Mungas, Dan; Possin, Katherine L; Rankin, Katherine P; Boxer, Adam L; Rosen, Howard J; Bostrom, Alan; Sinha, Lena; Berhel, Ashley; Widmeyer, Mary

    2014-01-01

    Executive functioning is widely targeted when human cognition is assessed, but there is little consensus on how it should be operationalized and measured. Recognizing the difficulties associated with establishing standard operational definitions of executive functioning, the National Institute of Neurological Disorders and Stroke entered into a contract with the University of California-San Francisco to develop psychometrically robust executive measurement tools that would be accepted by the neurology clinical trials and clinical research communities. This effort, entitled Executive Abilities: Measures and Instruments for Neurobehavioral Evaluation and Research (EXAMINER), resulted in a series of tasks targeting working memory, inhibition, set shifting, fluency, insight, planning, social cognition and behavior. We describe battery conceptualization and development, data collection, scale construction based on item response theory, and lay the foundation for studying the battery's utility and validity for specific assessment and research goals.

  17. Nuclear emergency response exercises and decision support systems - integrating domestic experience with international reference systems

    International Nuclear Information System (INIS)

    Slavnicu, D.S.; Vamanu, D.V.; Gheorghiu, D.; Acasandrei, V.T.; Slavnicu, E.

    2010-01-01

    The paper glosses on the experience of a research-oriented team routinely involved in emergency preparedness and response management activities, with the assimilation, implementation, and application of decision support systems (DSS) of continental reference in Europe, and the development of supportive, domestic radiological assessment tools. Two exemplary nuclear alert exercises are discussed, along with solutions that emerged during drill planning and execution, to make decision support tools of various origins and strength to work synergistically and complement each other. (authors)

  18. Identifying Opportunities for Decision Support Systems in Support of Regional Resource Use Planning: An Approach Through Soft Systems Methodology.

    Science.gov (United States)

    Zhu; Dale

    2000-10-01

    / Regional resource use planning relies on key regional stakeholder groups using and having equitable access to appropriate social, economic, and environmental information and assessment tools. Decision support systems (DSS) can improve stakeholder access to such information and analysis tools. Regional resource use planning, however, is a complex process involving multiple issues, multiple assessment criteria, multiple stakeholders, and multiple values. There is a need for an approach to DSS development that can assist in understanding and modeling complex problem situations in regional resource use so that areas where DSSs could provide effective support can be identified, and the user requirements can be well established. This paper presents an approach based on the soft systems methodology for identifying DSS opportunities for regional resource use planning, taking the Central Highlands Region of Queensland, Australia, as a case study.

  19. Interactive Decision-Support Tool for Risk-Based Radiation Therapy Plan Comparison for Hodgkin Lymphoma

    DEFF Research Database (Denmark)

    Brodin, N. Patrik; Maraldo, Maja V.; Aznar, Marianne C.

    2014-01-01

    PURPOSE: To present a novel tool that allows quantitative estimation and visualization of the risk of various relevant normal tissue endpoints to aid in treatment plan comparison and clinical decision making in radiation therapy (RT) planning for Hodgkin lymphoma (HL). METHODS AND MATERIALS...... and a volumetric modulated arc therapy plan for a patient with mediastinal HL. CONCLUSION: This multiple-endpoint decision-support tool provides quantitative risk estimates to supplement the clinical judgment of the radiation oncologist when comparing different RT options....... of dose-response curves to drive the reoptimization of a volumetric modulated arc therapy treatment plan for an HL patient with head-and-neck involvement. We also use this decision-support tool to visualize and quantitatively evaluate the trade-off between a 3-dimensional conformal RT plan...

  20. Executive and Perceptual Distraction in Visual Working Memory

    Science.gov (United States)

    2017-01-01

    The contents of visual working memory are likely to reflect the influence of both executive control resources and information present in the environment. We investigated whether executive attention is critical in the ability to exclude unwanted stimuli by introducing concurrent potentially distracting irrelevant items to a visual working memory paradigm, and manipulating executive load using simple or more demanding secondary verbal tasks. Across 7 experiments varying in presentation format, timing, stimulus set, and distractor number, we observed clear disruptive effects of executive load and visual distraction, but relatively minimal evidence supporting an interactive relationship between these factors. These findings are in line with recent evidence using delay-based interference, and suggest that different forms of attentional selection operate relatively independently in visual working memory. PMID:28414499

  1. Variations in disaster evacuation behavior: public responses versus private sector executive decision-making processes.

    Science.gov (United States)

    Drabek, T E

    1992-06-01

    Data obtained from 65 executives working for tourism firms in three sample communities permitted comparison with the public warning response literature regarding three topics: disaster evacuation planning, initial warning responses, and disaster evacuation behavior. Disaster evacuation planning was reported by nearly all of these business executives, although it was highly variable in content, completeness, and formality. Managerial responses to post-disaster warnings paralleled the type of complex social processes that have been documented within the public response literature, except that warning sources and confirmation behavior were significantly affected by contact with authorities. Five key areas of difference were discovered in disaster evacuation behavior pertaining to: influence of planning, firm versus family priorities, shelter selection, looting concerns, and media contacts.

  2. Stethoscope: A platform for interactive visual analysis of query execution plans

    NARCIS (Netherlands)

    M.M. Gawade (Mrunal); M.L. Kersten (Martin)

    2012-01-01

    textabstractSearching for the performance bottleneck in an execution trace is an error prone and time consuming activity. Existing tools oer some comfort by providing a visual representation of trace for analysis. In this paper we present the Stethoscope, an interactive visual tool to inspect and

  3. Stethoscope: a platform for interactive visual analysis of query execution plans

    NARCIS (Netherlands)

    Gawade, M.; Kersten, M.

    2012-01-01

    Searching for the performance bottleneck in an execution trace is an error prone and time consuming activity. Existing tools offer some comfort by providing a visual representation of trace for analysis. In this paper we present the Stethoscope, an interactive visual tool to inspect and ana- lyze

  4. Vector-model-supported optimization in volumetric-modulated arc stereotactic radiotherapy planning for brain metastasis

    International Nuclear Information System (INIS)

    Liu, Eva Sau Fan; Wu, Vincent Wing Cheung; Harris, Benjamin; Foote, Matthew; Lehman, Margot; Chan, Lawrence Wing Chi

    2017-01-01

    Long planning time in volumetric-modulated arc stereotactic radiotherapy (VMA-SRT) cases can limit its clinical efficiency and use. A vector model could retrieve previously successful radiotherapy cases that share various common anatomic features with the current case. The prsent study aimed to develop a vector model that could reduce planning time by applying the optimization parameters from those retrieved reference cases. Thirty-six VMA-SRT cases of brain metastasis (gender, male [n = 23], female [n = 13]; age range, 32 to 81 years old) were collected and used as a reference database. Another 10 VMA-SRT cases were planned with both conventional optimization and vector-model-supported optimization, following the oncologists' clinical dose prescriptions. Planning time and plan quality measures were compared using the 2-sided paired Wilcoxon signed rank test with a significance level of 0.05, with positive false discovery rate (pFDR) of less than 0.05. With vector-model-supported optimization, there was a significant reduction in the median planning time, a 40% reduction from 3.7 to 2.2 hours (p = 0.002, pFDR = 0.032), and for the number of iterations, a 30% reduction from 8.5 to 6.0 (p = 0.006, pFDR = 0.047). The quality of plans from both approaches was comparable. From these preliminary results, vector-model-supported optimization can expedite the optimization of VMA-SRT for brain metastasis while maintaining plan quality.

  5. Vector-model-supported optimization in volumetric-modulated arc stereotactic radiotherapy planning for brain metastasis

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Eva Sau Fan [Department of Radiation Oncology, Princess Alexandra Hospital, Brisbane (Australia); Department of Health Technology and Informatics, The Hong Kong Polytechnic University (Hong Kong); Wu, Vincent Wing Cheung [Department of Health Technology and Informatics, The Hong Kong Polytechnic University (Hong Kong); Harris, Benjamin [Department of Radiation Oncology, Princess Alexandra Hospital, Brisbane (Australia); Foote, Matthew; Lehman, Margot [Department of Radiation Oncology, Princess Alexandra Hospital, Brisbane (Australia); School of Medicine, University of Queensland (Australia); Chan, Lawrence Wing Chi, E-mail: wing.chi.chan@polyu.edu.hk [Department of Health Technology and Informatics, The Hong Kong Polytechnic University (Hong Kong)

    2017-07-01

    Long planning time in volumetric-modulated arc stereotactic radiotherapy (VMA-SRT) cases can limit its clinical efficiency and use. A vector model could retrieve previously successful radiotherapy cases that share various common anatomic features with the current case. The prsent study aimed to develop a vector model that could reduce planning time by applying the optimization parameters from those retrieved reference cases. Thirty-six VMA-SRT cases of brain metastasis (gender, male [n = 23], female [n = 13]; age range, 32 to 81 years old) were collected and used as a reference database. Another 10 VMA-SRT cases were planned with both conventional optimization and vector-model-supported optimization, following the oncologists' clinical dose prescriptions. Planning time and plan quality measures were compared using the 2-sided paired Wilcoxon signed rank test with a significance level of 0.05, with positive false discovery rate (pFDR) of less than 0.05. With vector-model-supported optimization, there was a significant reduction in the median planning time, a 40% reduction from 3.7 to 2.2 hours (p = 0.002, pFDR = 0.032), and for the number of iterations, a 30% reduction from 8.5 to 6.0 (p = 0.006, pFDR = 0.047). The quality of plans from both approaches was comparable. From these preliminary results, vector-model-supported optimization can expedite the optimization of VMA-SRT for brain metastasis while maintaining plan quality.

  6. Performance of planning support systems: what is it, and how do we report on it?

    NARCIS (Netherlands)

    te Brömmelstroet, M.C.G.

    2013-01-01

    Planning Support Systems (PSSs) are a family of computer based instruments specifically designed to support actors in their complex tasks in the field of planning. There is a gap between the high expectations that PSS developers have about the usefulness of their instruments and the instruments’

  7. The Female Executive’s Perspective on Career Planning and Advancement in Organizations

    Directory of Open Access Journals (Sweden)

    Dasie J. Schulz

    2014-11-01

    Full Text Available Gender bias continues to play a role in the gender discrepancy at executive levels in organizations across the United States, although women hold 51% of all middle management positions. Female middle managers may be overlooked for advancement to executive positions because of a lack of synergy between individual career planning and organizational development and advancement practices. This may have significant implications for organizations as they struggle to recruit and hire qualified senior leadership to close the widening leadership gap created as baby boomers leave the workforce in record numbers over the next decade. One way to retain talented, knowledgeable, female middle managers is to incorporate career planning and advancement programs, which increase visibility for both the individual and organizational leaders into potential advancement opportunities. This descriptive phenomenological study was designed to investigate and describe the lived experiences of female executives with career planning and advancement in organizations. Data collected from 16 female executives employed in organizations in Nashville, Tennessee, revealed that although individuals must make a commitment to career planning and take responsibility for executing the plan, successful career planning and advancement are dependent on others beyond the individual seeking advancement. The findings of this study are important for women who desire advancement to executive levels and to organizational leaders who want to hire and promote the right person for the job regardless of gender.

  8. An integrative architecture for general intelligence and executive function revealed by lesion mapping

    Science.gov (United States)

    Colom, Roberto; Solomon, Jeffrey; Krueger, Frank; Forbes, Chad; Grafman, Jordan

    2012-01-01

    Although cognitive neuroscience has made remarkable progress in understanding the involvement of the prefrontal cortex in executive control, the broader functional networks that support high-level cognition and give rise to general intelligence remain to be well characterized. Here, we investigated the neural substrates of the general factor of intelligence (g) and executive function in 182 patients with focal brain damage using voxel-based lesion–symptom mapping. The Wechsler Adult Intelligence Scale and Delis–Kaplan Executive Function System were used to derive measures of g and executive function, respectively. Impaired performance on these measures was associated with damage to a distributed network of left lateralized brain areas, including regions of frontal and parietal cortex and white matter association tracts, which bind these areas into a coordinated system. The observed findings support an integrative framework for understanding the architecture of general intelligence and executive function, supporting their reliance upon a shared fronto-parietal network for the integration and control of cognitive representations and making specific recommendations for the application of the Wechsler Adult Intelligence Scale and Delis–Kaplan Executive Function System to the study of high-level cognition in health and disease. PMID:22396393

  9. Executive Function: Implications for Education. NCER 2017-2000

    Science.gov (United States)

    Zelazo, Philip David; Blair, Clancy B.; Willoughby, Michael T.

    2016-01-01

    Executive function (EF) skills are the attention-regulation skills that make it possible to sustain attention, keep goals and information in mind, refrain from responding immediately, resist distraction, tolerate frustration, consider the consequences of different behaviors, reflect on past experiences, and plan for the future. As EF research…

  10. Using Action Plans to Support Communication Programming for Children Who Are Deafblind

    Science.gov (United States)

    Bruce, Susan M.

    2008-01-01

    The author describes the use of action plans to support 2 teachers' post-in-service implementation of communication strategies with 3 children who are deafblind. In the action plans, the teachers recorded changes in thinking and instructional practices under the 4 aspects of communication: form, function, content, and context. They also recorded…

  11. Multi-Year SSL Market Development Support Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ledbetter, Marc R.

    2012-05-01

    This plan sets out a strategic, five year framework for guiding DOE's market development support activities for high-performance solid-state lighting (SSL) products for the U.S. general illumination market. The market development support activities described in this plan, which span federal fiscal years 2012 to 2016, are intended to affect the types of SSL general illumination products adopted by the market, to accelerate commercial adoption of those products, and to support appropriate application of those products to maximize energy savings. DOE has established aggressive FY16 goals for these activities, including goals for the types of products brought to market, the market adoption of those products, and the energy savings achieved through use of SSL products. These goals are for the combined effect of DOE's SSL market development support and R and D investment, as well as the leveraged activities of its partners. Goals include: (1) inducing the market introduction of SSL products achieving 140 lumens per Watt (lm/W) for warm white products, and 155 lm/W for cool white products, and (2) inducing sales of high-performance SSL products that achieve annual site electricity savings of 21 terawatt hours (0.25 quadrillion Btus primary energy) by FY16. To overcome identified market barriers and to achieve the above five year goals, DOE proposes to carry out the following strategy. DOE will implement a multi-year program to accelerate adoption of good quality, high performance SSL products that achieve significant energy savings and maintain or improve lighting quality. Relying on lessons learned from past emerging technology introductions, such as compact fluorescent lamps, and using newly developed market research, DOE will design its efforts to minimize the likelihood that the SSL market will repeat mistakes that greatly delayed market adoption of earlier emerging technology market introductions. To achieve the maximum effect per dollar invested, DOE will

  12. Methodology for environmental audit of execution in gas-pipelines and pipelines

    International Nuclear Information System (INIS)

    Hurtado Palomino, Maria Patricia; Vargas Bejarano, Carlos Hernando

    1999-01-01

    In first instance the constructive aspects and the environmental impact related with the gas-pipes and pipelines construction are presented; then a methodology to make the environmental audit of execution in gas-pipes and pipelines, is showed. They contemplate four stages basically: planning, pre-auditory, execution and analysis, and post-auditory with their respective activities. Also, it is given to know, generalities of the practical case, to evaluate the applicability of the proposed methodology

  13. 12 CFR 563b.110 - Who must review my business plan?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Who must review my business plan? 563b.110... business plan? (a) Your chief executive officer and members of the board of directors must review, and at least two-thirds of your board of directors must approve, the business plan. (b) Your chief executive...

  14. Optimal Demand Execution Strategy for the Defense Logistics Agency

    Science.gov (United States)

    2014-12-01

    PLT Production Lead-Time PTO Paid Time Off FSC Federal Stock/Supply Class NIIN National Item Identification Number S & OP Sales and Operations...sales and operations planning ( S & OP ). The execution of S & OP involves a mix of inputs from management, sales, operations, finance, and product...four elements of a proper S & OP plan: supply, demand, volume, and mix. Supply in this context refers to the quantity available to meet the existing

  15. Products for geoinformation support for spatial planning and management within the framework of the project ONIX

    Directory of Open Access Journals (Sweden)

    Franc J. Zakrajšek

    2000-01-01

    Full Text Available The article gives a brief description of four products in the subproject Geoinformation support for physical planning and spatial management on the local level in the framework of the Onix project. The products are a result of a comprehensive approach to the development of information support, whose main features are unified dealing with planning acts, from the statutory plan and development plans to permitting procedures, multi-disciplinary approach and object oriented information approach.

  16. Applicability of EPRI Decommissioning Pre-Planning Manual to International Decommissioning Projects

    International Nuclear Information System (INIS)

    Lessard, Leo; Kay, Jim; Lefrancois, Donald; Furr, Richard; Lucas, Matthieu; Schauer, Konrad

    2016-01-01

    Industry models for planning the efficient decommissioning of a nuclear power plant continue to evolve. Effective planning is a key to cost control, a critical aspect of decommissioning. In 2001, the Electric Power Research Institute (EPRI) published the 'Decommissioning Pre-Planning Manual', referred to as the 'Manual'. The goal of the Manual was to develop a framework for use in pre-planning the decommissioning of a nuclear power plant. The original research was based on information collected during the active decommissioning of power reactors in New England, and the ongoing decommissioning planning of another reactor still in operation. The research team identified thirty-two (32) major Decommissioning Tasks that support the strategic and tactical planning that can be conducted in advance of plant shutdown. The Decommissioning Tasks were organized in a logical sequence of execution, and sorted in common discipline groupings. Owners of U.S. nuclear plants that have shut down prematurely during the past 5 years have found the EPRI Decommissioning Pre-Planning Manual useful in developing their transition plans from an operating to shutdown facility. Concurrently, during the past 15 years, the IAEA has published numerous technical and safety reports on nuclear reactor decommissioning planning and execution. IAEA's goal is to provide its global members with useful and timely guidance for the planning and execution of nuclear decommissioning projects. This information has been used extensively by international nuclear plant operators. One of the key objectives will be to develop a road-map linking the 32 EPRI Decommissioning Tasks with the comparable (or equivalent) topics covered in the IAEA library of decommissioning knowledge. The logical and convenient structure of the Manual will be cross-referenced to the IAEA topics to aid in organizing the development of decommissioning plans. The road-map will serve to provide a basis for improved

  17. Talking with Business. The Views of 101 Top Executives of Smaller Businesses on Their Role in Supporting Non-Profit Activities and Partnerships with Schools.

    Science.gov (United States)

    Carroll, Barry J.

    A study identified motivations and disincentives for business philanthropy among 101 small and medium-sized corporations operating nationwide, as revealed through interviews conducted with their executives from March through August 1984. Discussions identified several principal incentives to encourage corporate support of community services and…

  18. The Influence of Executive Functioning on Facial and Subjective Pain Responses in Older Adults

    Science.gov (United States)

    2016-01-01

    Cognitive decline is known to reduce reliability of subjective pain reports. Although facial expressions of pain are generally considered to be less affected by this decline, empirical support for this assumption is sparse. The present study therefore examined how cognitive functioning relates to facial expressions of pain and whether cognition acts as a moderator between nociceptive intensity and facial reactivity. Facial and subjective responses of 51 elderly participants to mechanical stimulation at three intensities levels (50 kPa, 200 kPa, and 400 kPa) were assessed. Moreover, participants completed a neuropsychological examination of executive functioning (planning, cognitive inhibition, and working memory), episodic memory, and psychomotor speed. The results showed that executive functioning has a unique relationship with facial reactivity at low pain intensity levels (200 kPa). Moreover, cognitive inhibition (but not other executive functions) moderated the effect of pressure intensity on facial pain expressions, suggesting that the relationship between pressure intensity and facial reactivity was less pronounced in participants with high levels of cognitive inhibition. A similar interaction effect was found for cognitive inhibition and subjective pain report. Consequently, caution is needed when interpreting facial (as well as subjective) pain responses in individuals with a high level of cognitive inhibition. PMID:27274618

  19. Creating a Marketing Plan.

    Science.gov (United States)

    Sevier, Robert A.

    1989-01-01

    A guide to developing a college marketing plan defines key marketing terms, outlines the development of a plan (including institutional analysis, market research, strategy formation and execution, and program evaluation), and provides a list of important principles with which to operate a program. (MSE)

  20. Naps Enhance Executive Attention in Preschool-Aged Children.

    Science.gov (United States)

    Cremone, Amanda; McDermott, Jennifer M; Spencer, Rebecca M C

    2017-09-01

    Executive attention is impaired following sleep loss in school-aged children, adolescents, and adults. Whether naps improve attention relative to nap deprivation in preschool-aged children is unknown. The aim of this study was to compare executive attention in preschool children following a nap and an interval of wake. Sixty-nine children, 35-70 months of age, completed a Flanker task to assess executive attention following a nap and an equivalent interval of wake. Overall, accuracy was greater after the nap compared with the wake interval. Reaction time(s) did not differ between the nap and wake intervals. Results did not differ between children who napped consistently and those who napped inconsistently, suggesting that naps benefit executive attention of preschoolers regardless of nap habituality. These results indicate that naps enhance attention in preschool children. As executive attention supports executive functioning and learning, nap promotion may improve early education outcomes. © The Author 2017. Published by Oxford University Press on behalf of the Society of Pediatric Psychology. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com

  1. Fathers' sensitive parenting and the development of early executive functioning.

    Science.gov (United States)

    Towe-Goodman, Nissa R; Willoughby, Michael; Blair, Clancy; Gustafsson, Hanna C; Mills-Koonce, W Roger; Cox, Martha J

    2014-12-01

    Using data from a diverse sample of 620 families residing in rural, predominately low-income communities, this study examined longitudinal links between fathers' sensitive parenting in infancy and toddlerhood and children's early executive functioning, as well as the contribution of maternal sensitive parenting. After accounting for the quality of concurrent and prior parental care, children's early cognitive ability, and other child and family factors, fathers' and mothers' sensitive and supportive parenting during play at 24 months predicted children's executive functioning at 3 years of age. In contrast, paternal parenting quality during play at 7 months did not make an independent contribution above that of maternal care, but the links between maternal sensitive and supportive parenting and executive functioning seemed to operate in similar ways during infancy and toddlerhood. These findings add to prior work on early experience and children's executive functioning, suggesting that both fathers and mothers play a distinct and complementary role in the development of these self-regulatory skills.

  2. Fathers’ Sensitive Parenting and the Development of Early Executive Functioning

    Science.gov (United States)

    Towe-Goodman, Nissa R.; Willoughby, Michael; Blair, Clancy; Gustafsson, Hanna C.; Mills-Koonce, W. Roger; Cox, Martha J.

    2014-01-01

    Using data from a diverse sample of 620 families residing in rural, predominately low-income communities, this study examined longitudinal links between fathers’ sensitive parenting in infancy and toddlerhood and children’s early executive functioning, as well as the contribution of maternal sensitive parenting. After accounting for the quality of concurrent and prior parental care, children’s early cognitive ability, and other child and family factors, fathers’ and mothers’ sensitive and supportive parenting during play at 24-months predicted children’s executive functioning at 3-years of age. In contrast, paternal parenting quality during play at 7-months did not make an independent contribution above that of maternal care, but the links between maternal sensitive and supportive parenting and executive functioning seemed to operate in similar ways during infancy and toddlerhood. These findings add to prior work on early experience and children’s executive functioning, suggesting that both fathers and mothers play a distinct and complementary role in the development of these self-regulatory skills. PMID:25347539

  3. Execution of a protocol for the supplier selection of a high density polyolefin

    International Nuclear Information System (INIS)

    Flores Pina, Lizette

    2013-01-01

    A new supplier of high-density polyolefin is selected for a medical industry, as a contingency plan in case the current provider presents problems of raw material supply. The Purchasing Department has coordinated the selection of the new resin supplier, providing high quality standards, deadlines and convenient price. The new resin obtained from the new provider was subjected to the protocol. The necessary tests were established for the comparison between the two resins (resin current and new resin). The tests were executed in a laboratory supported by the company in the United States. The tests most significant have corresponded to infrared Fourier transform tests, differential scanning calorimetry, melt flow rate and thermo gravimetry. Tests have defined the main characteristics of both resins with positive results and complying with the specifications set by the protocol. The two resins were established as such to be used in the production process of the product. Comparison phase of results are completely proceeding to execute the validation of the resin to run a test then preset design [es

  4. A Preliminary Study on the Effects of Training Using Behavior Support Plan Quality Evaluation Guide (BSP-QE) to Improve Positive Behavioral Support Plans

    Science.gov (United States)

    Wright, Diana Browning; Mayer, G. Roy; Cook, Clayton R.; Crews, S. Dean; Kraemer, Bonnie Rawlings; Gale, Bruce

    2007-01-01

    The purpose of this research was to evaluate the effects of two trainings designed to increase the competencies of professionals to develop high quality positive behavior support plans for students that engage in problem behaviors that interfere with theirs and/or others' ability to learn. Training one consisted of training attendees on six key…

  5. Support system development for evacuation plan decision in nuclear plant disaster

    International Nuclear Information System (INIS)

    Fujita, Masahiko; Takayama, Jun-ichi; Nakayama, Sho-ichiro; Ushiba, Takashi

    2011-01-01

    These days, our interest in nuclear plant accidents has increased, and civic actions for them have also been activated. Therefore, improvement of the disaster prevention planning to nuclear plant accidents is requested. In this study, we developed a microscopic traffic simulation system for evacuation plan near the nuclear plant as a system which supports to examine the disaster prevention planning, and applied the system to Kashiwazaki-Kariwa nuclear plant area. Furthermore, the risk of each region near the nuclear plant disaster from the viewpoint of wind direction and the population was considered, the importance of each evacuation simulation was examined. As a result, we found that the present plan Kashiwazaki-Kariwa made has the problem on evacuation routes and others. (author)

  6. Executive dysfunction, severity of traumatic brain injury, and IQ in workers with disabilities.

    Science.gov (United States)

    Matheson, Leonard

    2010-01-01

    To study whether severity of traumatic brain injury and the intelligence quotient are related to executive dysfunction. Sixty-two adults with brain injury who were referred for a work capacity evaluation. Retrospective review of severity of traumatic brain injury, intelligence quotient from a previously-conducted neuropsychological evaluation, determination of executive function status from the neuropsychological evaluation, and both self-report and informant-report executive dysfunction scores from the Behavior Rating Inventory of Executive Function. Executive dysfunction and the intelligence quotient are related to severity of traumatic brain injury, but executive dysfunction and the intelligence quotient are not related to each other. Executive dysfunction as determined by a neuropsychological evaluation was not consistent with clients' self-reports but was consistent with informant-reported executive dysfunction. Five types of executive dysfunction were reported by knowledgeable informants, with significant elevations on the Shift, Plan/Organize, Task Monitor, Organization of Materials, and Working Memory BRIEF clinical scales. The intelligence quotient is not a useful indicator of executive dysfunction. Informant-report executive dysfunction is a reliable and potentially useful adjunct to a neuropsychological evaluation. Working memory is the most severe type of executive dysfunction and may not be adequately measured by current neuropsychological evaluation methods.

  7. Executive and perceptual distraction in visual working memory.

    Science.gov (United States)

    Allen, Richard J; Baddeley, Alan D; Hitch, Graham J

    2017-09-01

    The contents of visual working memory are likely to reflect the influence of both executive control resources and information present in the environment. We investigated whether executive attention is critical in the ability to exclude unwanted stimuli by introducing concurrent potentially distracting irrelevant items to a visual working memory paradigm, and manipulating executive load using simple or more demanding secondary verbal tasks. Across 7 experiments varying in presentation format, timing, stimulus set, and distractor number, we observed clear disruptive effects of executive load and visual distraction, but relatively minimal evidence supporting an interactive relationship between these factors. These findings are in line with recent evidence using delay-based interference, and suggest that different forms of attentional selection operate relatively independently in visual working memory. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  8. The effect of negative affect on cognition: Anxiety, not anger, impairs executive function.

    Science.gov (United States)

    Shields, Grant S; Moons, Wesley G; Tewell, Carl A; Yonelinas, Andrew P

    2016-09-01

    It is often assumed that negative affect impairs the executive functions that underlie our ability to control and focus our thoughts. However, support for this claim has been mixed. Recent work has suggested that different negative affective states like anxiety and anger may reflect physiologically separable states with distinct effects on cognition. However, the effects of these 2 affective states on executive function have never been assessed. As such, we induced anxiety or anger in participants and examined the effects on executive function. We found that anger did not impair executive function relative to a neutral mood, whereas anxiety did. In addition, self-reports of induced anxiety, but not anger, predicted impairments in executive function. These results support functional models of affect and cognition, and highlight the need to consider differences between anxiety and anger when investigating the influence of negative affect on fundamental cognitive processes such as memory and executive function. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  9. Responsive partisanship: public support for the clinton and obama health care plans.

    Science.gov (United States)

    Kriner, Douglas L; Reeves, Andrew

    2014-08-01

    We examine the contours of support for the Clinton and Obama health care plans during the 1990s and 2000s based on our own compilation of 120,000 individual-level survey responses from throughout the debates. Despite the rise of the Tea Party, and the racialization of health care politics, opinion dynamics are remarkably similar in both periods. Party ID is the single most powerful predictor of support for reform and the president's handling of it. Contrary to prominent claims, after controlling for partisanship, demographic characteristics are at best weak predictors of support for reform. We also show that Clinton and Obama did not "lose" blacks, seniors, or wealthy voters over the course of the debate. The small and often nonexistent relationship between these characteristics and support for the plan are constant over time. Instead, the modest fluctuations in support for reform appear to follow the ebb and flow of elite rhetoric. Both mean levels of support and its volatility over time covary with elite partisan discourse. These findings suggest that presidents courting public opinion should seek consensus among their own party's elites before appealing to other narrower interests. Copyright © 2014 by Duke University Press.

  10. Planning and Executing the Neurosurgery Boot Camp: The Bolivia Experience.

    Science.gov (United States)

    Ament, Jared D; Kim, Timothy; Gold-Markel, Judah; Germano, Isabelle M; Dempsey, Robert; Weaver, John P; DiPatri, Arthur J; Andrews, Russell J; Sanchez, Mary; Hinojosa, Juan; Moser, Richard P; Glick, Roberta

    2017-08-01

    The neurosurgical boot camp has been fully incorporated into U.S. postgraduate education. This is the first implementation of the neurosurgical boot in a developing country. To advance neurosurgical education, we developed a similar boot camp program, in collaboration with Bolivian neurosurgeons, to determine its feasibility and effectiveness in an international setting. In a collective effort, the Bolivian Society for Neurosurgery, Foundation for International Education in Neurological Surgery, Solidarity Bridge, and University of Massachusetts organized and executed the first South American neurosurgical boot camp in Bolivia in 2015. Both U.S. and Bolivian faculty led didactic lectures followed by a practicum day using mannequins and simulators. South American residents and faculty were surveyed after the course to determine levels of enthusiasm and their perceived improvement in fund of knowledge and course effectiveness. Twenty-four neurosurgery residents from 5 South American countries participated. Average survey scores ranged between 4.2 and 4.9 out of 5. Five Bolivian neurosurgeons completed the survey with average scores of 4.5-5. This event allowed for Bolivian leaders in the field to unify around education, resulting in the formation of an institute to continue similar initiatives. Total cost was estimated at $40 000 USD; however, significant faculty, industry, and donor support helped offset this amount. The first South American neurosurgical boot camp had significant value and was well received in Bolivia. This humanitarian model provides a sustainable solution to education needs and should be expanded to other regions as a means for standardizing the core competencies in neurosurgery. Copyright © 2017 Elsevier Inc. All rights reserved.

  11. National Ignition Facility Cryogenic Target Systems Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety and Health (ES and H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for

  12. Introduction to ‘Planning support science for smarter urban futures’

    NARCIS (Netherlands)

    Geertman, Stan; Allan, Andrew; Pettit, Chris; Stillwell, John

    2017-01-01

    This introductory chapter establishes the context for subsequent contributions by outlining some of the major physical and social challenges that confront planners and policy-makers in different parts of the world. It then explains how the development of planning support systems has evolved into a

  13. Executive and Memory Function in Adolescents Born Very Preterm

    Science.gov (United States)

    Ment, Laura; Allan, Walter; Schneider, Karen; Vohr, Betty R.

    2011-01-01

    BACKGROUND: Many preterm children display school difficulties, which may be mediated by impairment in executive function and memory. OBJECTIVE: To evaluate executive and memory function among adolescents born preterm compared with term controls at 16 years. METHODS: A total of 337 of 437 (77%) adolescents born in 1989 to 1992 with a birth weight executive function and memory tasks. Multiple regression analyses were used to compare groups and to identify associations between selected factors and outcomes among preterm subjects. RESULTS: Adolescents born preterm, compared with term controls, showed deficits in executive function in the order of 0.4 to 0.6 SD on tasks of verbal fluency, inhibition, cognitive flexibility, planning/organization, and working memory as well as verbal and visuospatial memory. After exclusion of adolescents with neurosensory disabilities and full-scale IQ executive dysfunction, as measured with the Behavior Rating Inventory of Executive Function, on the Metacognition Index (odds ratio [OR]: 2.5 [95% confidence interval (CI): 1.2–5.1]) and the Global Executive Composite (OR: 4.2 [95% CI: 1.6–10.9]), but not on the Behavioral Regulation index (OR: 1.5 [95% CI: 0.7–3.5]). Among adolescents born preterm, severe brain injury on neonatal ultrasound and lower maternal education were the most consistent factors associated with poor outcomes. CONCLUSIONS: Even after exclusion of preterm subjects with significant disabilities, adolescents born preterm in the early 1990s were at increased risk of deficits in executive function and memory. PMID:21300680

  14. Sustainable NREL - Site Sustainability Plan FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2015-01-01

    NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

  15. Discerning and Addressing Environmental Failures in Policy Scenarios Using Planning Support System (PSS Technologies

    Directory of Open Access Journals (Sweden)

    Brian Deal

    2016-12-01

    Full Text Available The environmental consequences of planning decisions are often undervalued. This can result from a number of potential causes: (a there might be a lack of adequate information to correctly assess environmental consequences; (b stakeholders might discount the spatial and temporal impacts; (c a failure to understand the dynamic interactions between socio-ecological systems including secondary and tertiary response mechanisms; or (d the gravity of the status quo, i.e., blindly following a traditional discourse. In this paper, we argue that a Planning Support System (PSS that enhances an assessment of environmental impacts and is integral to a community or regional planning process can help reveal the true environmental implications of scenario planning decisions, and thus improve communal planning and decision-making. We demonstrate our ideas through our experiences developing and deploying one such PSS—the Land-use Evolution and impact Assessment Model (LEAM Planning Support System. University of Illinois researchers have worked directly with government planning officials and community stakeholders to analyze alternate future development scenarios and improve the planning process through a participatory, iterative process of visioning, model tuning, simulation, and discussion. The resulting information enables an evaluation of alternative policy or investment choices and their potential environmental implications that can change the way communities both generate and use plans.

  16. Explicable Planning and Replanning for Human-in-the-loop Decision Support

    Data.gov (United States)

    National Aeronautics and Space Administration — For the decision support scenarios that are particularly relevant to NASA, such as planning for human space missions, human operators will need a system that can (i)...

  17. 2014 Zero Waste Strategic Plan Executive Summary.

    Energy Technology Data Exchange (ETDEWEB)

    Wrons, Ralph J.

    2016-05-01

    Sandia National Laboratories/New Mexico is located in Albuquerque, New Mexico, primarily on Department of Energy (DOE) permitted land on approximately 2,800 acres of Kirtland Air Force Base. There are approximately 5.5 million square feet of buildings, with a workforce of approximately 9200 personnel. Sandia National Laboratories Materials Sustainability and Pollution Prevention (MSP2) program adopted in 2008 an internal team goal for New Mexico site operations for Zero Waste to Landfill by 2025. Sandia solicited a consultant to assist in the development of a Zero Waste Strategic Plan. The Zero Waste Consultant Team selected is a partnership of SBM Management Services and Gary Liss & Associates. The scope of this Plan is non-hazardous solid waste and covers the life cycle of material purchases to the use and final disposal of the items at the end of their life cycle.

  18. Usefulness of Planning Support Systems : Conceptual perspectives and practitioners' experiences

    NARCIS (Netherlands)

    Pelzer, P.

    2015-01-01

    This dissertation starts by observing (Chapter 1) that the question of supporting planning and policy making with dedicated information is an old and important one. In the end of the 1980s a research field emerges dedicated to specifically cater instruments to the needs of practitioners, so

  19. Mandatory IFRS adoption and executive compensation: Evidence from China

    OpenAIRE

    Qingchuan Hou; Qinglu Jin; Lanfang Wang

    2014-01-01

    This study investigates how the mandatory adoption of International Financial Reporting Standards (IFRS) affects the contractual benefits of using accounting information to determine executive compensation in China. After controlling for firm and corporate governance characteristics, we find strong evidence supporting the positive role of mandatory IFRS adoption on the accounting-based performance sensitivity of executive compensation. Subsample analysis suggests that improvements in accounti...

  20. Study on environmental friendly national park management plan: concentrated on the support plan for national park residents

    Energy Technology Data Exchange (ETDEWEB)

    Park, Yong Ha; Byun, Byoung Seol; Chung, Hoe Seong; Kim, Mi Sook; Kim, Jeong Won; Joo, Yong Joon [Korea Environment Institute, Seoul (Korea)

    1999-12-01

    National parks in Korea have been selected for preserving beautiful sceneries of nature or diversity of organisms. Today as the increase of population and industrialization has caused the increase of natural resource demand, it is difficult to preserve all ecosystems equally. Therefore the national park system has established to prevent the damage to an ecosystem or to preserve a region that can be damaged by selecting a valuable area. The objective of this study is to recommend an efficient support plan for national park residents, to induce their activities to be environmental friendly and to preserve an ecosystem in a national park. To achieve this, the similar systems, laws and cases in the advanced countries have compared and reviewed and a support plan for residents appropriate for Korean situation has discussed. 41 refs., 4 figs., 33 tabs.

  1. Initial Scale Development of the Contextual Support for Post-Secondary Planning Scales

    Science.gov (United States)

    Ali, Saba Rasheed; Martens, Jessica Kelly; Button, Christopher; Larma, Nicholas C.

    2011-01-01

    Vocational psychologists and career theorists have articulated the importance of social support in the development of career plans for high school youth. More recently, Lent, Brown, and Hackett carefully articulated the location of contextual supports in the Social Cognitive Career Theory (SCCT) framework. However, there is a paucity of research…

  2. Mastery of energy, decentralization and regional planning in France - a challenge

    Energy Technology Data Exchange (ETDEWEB)

    Ripert, C.; Lagarde, R.

    1986-01-01

    Attempting to bring together the people involved in setting-up energy control policies, supporting regional authorities in their efforts for regional energy planning and establishing close cooperation with regional executive authorities... in other words, Regionalizing France - isn't this the great gamble being taken in a field which has been historically marked by strong centralization. This is the challenge which the AFME, the French Agency for the Mastery of Energy, has accepted.

  3. Algorithm for decision support as the tool for control system of industries with variable assortment of products

    Science.gov (United States)

    Ladaniuk, Anatolii; Ivashchuk, Viacheslav; Kisała, Piotr; Askarova, Nursanat; Sagymbekova, Azhar

    2015-12-01

    Conditions of diversification of enterprise products are involving for changes of higher levels of management hierarchy, so it's leading by tasks correcting and changing schedule for operating of production plans. Ordinary solve by combination of enterprise resource are planning and management execution system often has exclusively statistical content. So, the development of decision support system, that helps to use knowledge about subject for capabilities estimating and order of operation of production object is relevant in this time.

  4. Work Participation and Executive Abilities in Patients with Relapsing-Remitting Multiple Sclerosis.

    Directory of Open Access Journals (Sweden)

    Karin van der Hiele

    Full Text Available The majority of patients with Multiple Sclerosis (MS are unable to retain employment within 10 years from disease onset. Executive abilities, such as planning, working memory, attention, problem solving, inhibition and mental flexibility may have a direct impact on the ability to maintain a job. This study investigated differences in subjective and objective executive abilities between relapsing-remitting MS patients with and without a paid job. We included 55 relapsing-remitting MS patients from a community-based sample (47 females; mean age: 47 years; 36% employed. Patients underwent neurological, cognitive and psychological assessments at their homes, including an extensive executive test battery. We found that unemployed patients had a longer disease duration (t(53=2.76, p=0.008 and reported more organising and planning problems (χ2(1=6.3, p=0.012, higher distractibility (Kendall's tau-b= -0.24, p=0.03 and more cognitive fatigue (U=205.0, p=0.028, r=-0.30 than employed patients. Unemployed patients completed slightly less categories on the Wisconsin Card Sorting Test (U=243.5, p=0.042, r=-0.28. Possible influential factors such as age, educational level, physical functioning, depression and anxiety did not differ between groups. In conclusion, while relapsing-remitting MS patients without a paid job reported more executive problems and cognitive fatigue than patients with a paid job, little differences were found in objective executive abilities. Further research is needed to examine possible causal relations.

  5. Work Participation and Executive Abilities in Patients with Relapsing-Remitting Multiple Sclerosis.

    Science.gov (United States)

    van der Hiele, Karin; van Gorp, Dennis; Ruimschotel, Rob; Kamminga, Noëlle; Visser, Leo; Middelkoop, Huub

    2015-01-01

    The majority of patients with Multiple Sclerosis (MS) are unable to retain employment within 10 years from disease onset. Executive abilities, such as planning, working memory, attention, problem solving, inhibition and mental flexibility may have a direct impact on the ability to maintain a job. This study investigated differences in subjective and objective executive abilities between relapsing-remitting MS patients with and without a paid job. We included 55 relapsing-remitting MS patients from a community-based sample (47 females; mean age: 47 years; 36% employed). Patients underwent neurological, cognitive and psychological assessments at their homes, including an extensive executive test battery. We found that unemployed patients had a longer disease duration (t(53)=2.76, p=0.008) and reported more organising and planning problems (χ2(1)=6.3, p=0.012), higher distractibility (Kendall's tau-b= -0.24, p=0.03) and more cognitive fatigue (U=205.0, p=0.028, r=-0.30) than employed patients. Unemployed patients completed slightly less categories on the Wisconsin Card Sorting Test (U=243.5, p=0.042, r=-0.28). Possible influential factors such as age, educational level, physical functioning, depression and anxiety did not differ between groups. In conclusion, while relapsing-remitting MS patients without a paid job reported more executive problems and cognitive fatigue than patients with a paid job, little differences were found in objective executive abilities. Further research is needed to examine possible causal relations.

  6. Improvement of tool support of the spatial approach to regional planning: problems, specifics, trends

    Directory of Open Access Journals (Sweden)

    Nataliya Gennadievna Yushkova

    2015-01-01

    Full Text Available The emerging imperatives of innovation economic development in Russia determine the content of conceptual and institutional constraints to the development of regional economic systems (RES. They consider the regional planning system as a leading priority in its inseparable unity with modern public administration tasks. However, the practice of development of long-term plans in the RF subjects proves that the innovation challenges of economic policy are not reflected properly in them or they are significantly distorted. The following reasons reduce the effectiveness of modernization processes in the RF subjects and hamper the appropriate reaction of RES on their impact: the lack of coordination between socio-economic and spatial regional plans, the imbalance of interaction between state authorities engaged in long-term planning, the lack of real prerequisites for the implementation of innovation initiatives in the regions. Systematization and analysis of long-term plans make it possible to substantiate the consistency of the spatial approach to regional planning expressed in the dominance of the transformational function that synchronizes the configuration and parameters of RES, and to establish ways to integrate spatial components in the system of regional planning through optimization of its tool support. The change in the content of the instrumentation support is based on the synthesis of the predominant basic characteristics of the existing tools used in isolated subsystems of regional planning of socio-economic and territorial development. The study has established a system of tool support for regional planning that adapts to the changes in both internal and external factors in the development of RES. Three main groups of tools: organizing, regulating, and coordinating are defined by their typing in accordance with the groups of management functions. The article proposes the modeling of combinations of tools that are subordinated to the

  7. Planning, Anticipatory Systems, and Kinds of Actors

    Science.gov (United States)

    Jorna, René; van Wezel, Wout

    2002-09-01

    Anticipation and planning have much in common. Anticipation means being ahead of things. Planning means not only anticipating on things to come, but also trying to determine a course of action to reach a goal. Planning is investigated in many domains, for example, in economy, biology, and in the cognitive sciences. Each of these domains uses its own research methodologies, languages, ontologies, and models. Although there are many differences between the various approaches and models, there must of course also be similarities, since they all deal with establishing a future course of actions to reach a goal. We will compare several planning approaches on a number of aspects, e.g., the kind of entity that makes the plan (natural or artificial), whether the plan is executed by the planner or by another entity, representational issues, and the domain that the plan is executed in. Our article focuses on analytical dimensions in the extended field of planning. We do not discuss empirical results.

  8. Rehabilitation of executive functions: Implications and strategies

    Directory of Open Access Journals (Sweden)

    Bruno Kluwe-Schiavon

    2013-01-01

    Full Text Available Executive Functions (EF concern a range of abilities including problem-solving, planning, initiation, selfmonitoring,conscious attention, cope with new situations and the ability to modify plans if necessary. It’s a high cognitive function that is crucial for a person to get engaged and maintain daily activities whilst keeping a good quality of life. Problems in the EF were formerly known as Dysexecutive Syndrome (DS. There are many models concerning DS, although the literature on the subject still remains unclear. Several works appoint the effects brought by elderly life, as well as abuse of drugs and some psychopathologies. These factors are known to increase the distress of the frontal circuits and that could be associated to executive deficits. The effects of DS would compromise individuals in day-to-day routine, academic, social and labor fields. There is a growing body of studies trying to determine the causes, implications, associations and the best way to take care of these effects. This work intends to review DS, focusing on the most important fields related to this area, such as psychopathology associations, cognitive reserve, assessment and cognitive rehabilitation programs.

  9. [An approach to the executive functions in autism spectrum disorder].

    Science.gov (United States)

    Martos-Pérez, Juan; Paula-Pérez, Isabel

    2011-03-01

    The psychological hypothesis of executive dysfunction plays a crucial role in explaining the behavioural phenotype of persons with autism spectrum disorders (ASD), along with other hypotheses such as the deficit in the theory of mind or the weak central coherence hypothesis. Yet, none of these hypotheses are mutually exclusive and behaviours that have their origins in one of these three hypotheses are also shaped and upheld by other processes and factors. This article reviews the behavioural manifestation and current state of research on the executive functions in persons with ASD. It also examines its impact on planning, mental flexibility and cognitive skills, generativity, response inhibition, mentalist skills and sense of activity. Although executive dysfunction has become more significant as a hypothesis explaining persons with ASD, there remain some important difficulties in need of further, more detailed research. Moreover, very few intervention programmes have been proved to be effective in minimising the effects of executive dysfunction in autism.

  10. The impact of executive function on response to cognitive behavioral therapy in late-life depression.

    Science.gov (United States)

    Goodkind, Madeleine S; Gallagher-Thompson, Dolores; Thompson, Larry W; Kesler, Shelli R; Anker, Lauren; Flournoy, John; Berman, Mika P; Holland, Jason M; O'Hara, Ruth M

    2016-04-01

    Late-life depression (LLD) is a common and debilitating condition among older adults. Cognitive behavioral therapy (CBT) has strong empirical support for the treatment of depression in all ages, including in LLD. In teaching patients to identify, monitor, and challenge negative patterns in their thinking, CBT for LLD relies heavily on cognitive processes and, in particular, executive functioning, such as planning, sequencing, organizing, and selectively inhibiting information. It may be that the effectiveness of CBT lies in its ability to train these cognitive areas. Participants with LLD completed a comprehensive neuropsychological battery before enrolling in CBT. The current study examined the relationship between neuropsychological function prior to treatment and response to CBT. When using three baseline measures of executive functioning that quantify set shifting, cognitive flexibility, and response inhibition to predict treatment response, only baseline Wisconsin Card Sort Task performance was associated with a significant drop in depression symptoms after CBT. Specifically, worse performance on the Wisconsin Card Sort Task was associated with better treatment response. These results suggest that CBT, which teaches cognitive techniques for improving psychiatric symptoms, may be especially beneficial in LLD if relative weaknesses in specific areas of executive functioning are present. Copyright © 2015 John Wiley & Sons, Ltd.

  11. Parenting, corpus callosum, and executive function in preschool children.

    Science.gov (United States)

    Kok, Rianne; Lucassen, Nicole; Bakermans-Kranenburg, Marian J; van IJzendoorn, Marinus H; Ghassabian, Akhgar; Roza, Sabine J; Govaert, Paul; Jaddoe, Vincent W; Hofman, Albert; Verhulst, Frank C; Tiemeier, Henning

    2014-01-01

    In this longitudinal population-based study (N = 544), we investigated whether early parenting and corpus callosum length predict child executive function abilities at 4 years of age. The length of the corpus callosum in infancy was measured using postnatal cranial ultrasounds at 6 weeks of age. At 3 years, two aspects of parenting were observed: maternal sensitivity during a teaching task and maternal discipline style during a discipline task. Parents rated executive function problems at 4 years of age in five domains of inhibition, shifting, emotional control, working memory, and planning/organizing, using the Behavior Rating Inventory of Executive Function-Preschool Version. Maternal sensitivity predicted less executive function problems at preschool age. A significant interaction was found between corpus callosum length in infancy and maternal use of positive discipline to determine child inhibition problems: The association between a relatively shorter corpus callosum in infancy and child inhibition problems was reduced in children who experienced more positive discipline. Our results point to the buffering potential of positive parenting for children with biological vulnerability.

  12. Reconfiguration of brain network architecture to support executive control in aging.

    Science.gov (United States)

    Gallen, Courtney L; Turner, Gary R; Adnan, Areeba; D'Esposito, Mark

    2016-08-01

    Aging is accompanied by declines in executive control abilities and changes in underlying brain network architecture. Here, we examined brain networks in young and older adults during a task-free resting state and an N-back task and investigated age-related changes in the modular network organization of the brain. Compared with young adults, older adults showed larger changes in network organization between resting state and task. Although young adults exhibited increased connectivity between lateral frontal regions and other network modules during the most difficult task condition, older adults also exhibited this pattern of increased connectivity during less-demanding task conditions. Moreover, the increase in between-module connectivity in older adults was related to faster task performance and greater fractional anisotropy of the superior longitudinal fasciculus. These results demonstrate that older adults who exhibit more pronounced network changes between a resting state and task have better executive control performance and greater structural connectivity of a core frontal-posterior white matter pathway. Copyright © 2016 Elsevier Inc. All rights reserved.

  13. A Process for Planning.

    Science.gov (United States)

    Gurowitz, William D.; And Others

    1988-01-01

    Describes how Division of Campus Life at Cornell University conducted long-range planning and the results of its 2-year effort. Explains 2 (strategic and organizational) by 3 (diagnosis, formulation, and execution) matrix providing systems view from describing and evaluating long-range planning. Presents 10-step process implemented at Cornell. (NB)

  14. Planning and management support for NPP personnel SAT-based training programmes

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    Planning and management support for NPP personnel SAT-based training programmes is described for the following job positions: reactor operator; turbine operator; reactor maintenance worker; pump maintenance worker; chemistry foreman; health physics foreman; electric maintenance worker

  15. Stress analysis of piping systems and piping supports. Documentation

    International Nuclear Information System (INIS)

    Rusitschka, Erwin

    1999-01-01

    The presentation is focused on the Computer Aided Tools and Methods used by Siemens/KWU in the engineering activities for Nuclear Power Plant Design and Service. In the multi-disciplinary environment, KWU has developed specific tools to support As-Built Documentation as well as Service Activities. A special application based on Close Range Photogrammetry (PHOCAS) has been developed to support revamp planning even in a high level radiation environment. It comprises three completely inter-compatible expansion modules - Photo Catalog, Photo Database and 3D-Model - to generate objects which offer progressively more utilization and analysis options. To support the outage planning of NPP/CAD-based tools have been developed. The presentation gives also an overview of the broad range of skills and references in: Plant Layout and Design using 3D-CAD-Tools; evaluation of Earthquake Safety (Seismic Screening); Revamps in Existing Plants; Inter-disciplinary coordination of project engineering and execution fields; Consulting and Assistance; Conceptual Studies; Stress Analysis of Piping Systems and Piping Supports; Documentation; Training and Supports in CAD-Design, etc. All activities are performed to the greatest extent possible using proven data-processing tools. (author)

  16. Shuttle operations era planning for flight operations

    Science.gov (United States)

    Holt, J. D.; Beckman, D. A.

    1984-01-01

    The Space Transportation System (STS) provides routine access to space for a wide range of customers in which cargos vary from single payloads on dedicated flights to multiple payloads that share Shuttle resources. This paper describes the flight operations planning process from payload introduction through flight assignment to execution of the payload objectives and the changes that have been introduced to improve that process. Particular attention is given to the factors that influence the amount of preflight preparation necessary to satisfy customer requirements. The partnership between the STS operations team and the customer is described in terms of their functions and responsibilities in the development of a flight plan. A description of the Mission Control Center (MCC) and payload support capabilities completes the overview of Shuttle flight operations.

  17. Network Operations Support Plan for the Spot 2 mission (revision 1)

    Science.gov (United States)

    Werbitzky, Victor

    1989-01-01

    The purpose of this Network Operations Support Plan (NOSP) is to indicate operational procedures and ground equipment configurations for the SPOT 2 mission. The provisions in this document take precedence over procedures or configurations in other documents.

  18. Fast Interactive Decision Support for Modifying Stowage Plans Using Binary Decision Diagrams

    DEFF Research Database (Denmark)

    Jensen, Rune Møller; Leknes, Eilif; Bebbington, Thomas

    Low cost containerized shipping requires high quality stowage plans. Scalable stowage planning optimization algorithms have been developed recently. All of these algorithms, however, produce monolithic solutions that are hard for stowage coordinators to modify, which is necessary in practice due ...... fast, complete, and backtrack-free decision support. Our computational results show that the approach can solve real-sized instances when breaking symmetries among similar containers...

  19. Predicting Social Support for Grieving Persons: A Theory of Planned Behavior Perspective

    Science.gov (United States)

    Bath, Debra M.

    2009-01-01

    Research has consistently reported that social support from family, friends, and colleagues is an important factor in the bereaved person's ability to cope after the loss of a loved one. This study used a Theory of Planned Behavior framework to identify those factors that predict a person's intention to interact with, and support, a grieving…

  20. Development of a smart city planning support tool using the cooperative method

    Directory of Open Access Journals (Sweden)

    Takeshi Kobayashi

    2015-12-01

    Full Text Available A reduction of environmental burdens is currently required. In particular, proposing a new approach for the construction of a smart city using renewable energy is important. The technological development of a smart city is founded building equipment and infrastructure. However, planning methods and their techniques using the collaboration approach with residents are only just developing. This study aimed to develop a support tool for the construction of a smart city using renewable energy while facilitating consensus-building efforts among residents using the method for a cooperative housing development. We organized the supporting methods for the construction of residential area using the cooperative method. Then, we developed supporting tools that interface the computer with these methods. We examined the support techniques for the construction of a residential area using renewable energy technology by analyzing Japanese cases of a smart city. Moreover, we developed a support tool for the construction of a smart city on a trial basis. We integrated the smart city construction tools and the cooperative housing construction support tool. This tool has a 3D modeling system that helps residents to easily understand the space image as a result of the examination. We also developed a professional supporting tool that residents can consider for cost-effectiveness in renewable energy and its environmental load reduction rate for the planning of a smart city.

  1. Seeing conflict and engaging control: Experience with contrastive language benefits executive function in preschoolers.

    Science.gov (United States)

    Doebel, Sabine; Zelazo, Philip David

    2016-12-01

    Engaging executive function often requires overriding a prepotent response in favor of a conflicting but adaptive one. Language may play a key role in this ability by supporting integrated representations of conflicting rules. We tested whether experience with contrastive language that could support such representations benefits executive function in 3-year-old children. Children who received brief experience with language highlighting contrast between objects, attributes, and actions showed greater executive function on two of three 'conflict' executive function tasks than children who received experience with contrasting stimuli only and children who read storybooks with the experimenter, controlling for baseline executive function. Experience with contrasting stimuli did not benefit executive function relative to reading books with the experimenter, indicating experience with contrastive language, rather than experience with contrast generally, was key. Experience with contrastive language also boosted spontaneous attention to contrast, consistent with improvements in representing contrast. These findings indicate a role for language in executive function that is consistent with the Cognitive Complexity and Control theory's key claim that coordinating conflicting rules is critical to overcoming perseveration, and suggest new ideas for testing theories of executive function. Copyright © 2016 Elsevier B.V. All rights reserved.

  2. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J.; Yancey, E.F.

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs

  3. Hanford Site Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  4. Mission-directed path planning for planetary rover exploration

    Science.gov (United States)

    Tompkins, Paul

    2005-07-01

    . Simulations exhibit that the new methodology succeeds where conventional path planners would fail. Three planetary-relevant field experiments demonstrate the power of mission-directed path planning in directing actual exploration robots. Offline mission-directed planning sustained a solar-powered rover in a 24-hour sun-synchronous traverse. Online planning and re-planning enabled full navigational autonomy of over 1 kilometer, and supported the execution of science activities distributed over hundreds of meters.

  5. Project Specific Quality Assurance Plan

    International Nuclear Information System (INIS)

    Pedersen, K.S.

    1995-01-01

    This Quality Assurance Project Plan (QAPP) identifies the Westinghouse Hanford Co. (WHC) Quality Assurance (QA) program requirements for all contractors involved in the planning and execution of the design, construction, testing and inspection of the 200 Area Effluent BAT/AKART Implementation, Project W-291

  6. Neuropsychological evaluation of deficits in executive functioning for ADHD children with or without learning disabilities.

    Science.gov (United States)

    Wu, Kitty K; Anderson, Vicki; Castiello, Umberto

    2002-01-01

    This study investigates multiple aspects of executive functioning in children with attention deficit/hyperactivity disorder (ADHD). These areas include attentional components, impulsiveness, planning, and problem solving. The rationale of the study is based on neurophysiological studies that suggest frontal lobe dysfunction in ADHD. As frontal lobe functioning is related to abilities in executive control, ADHD is hypothesised to be associated with deficits in various areas of executive functioning. The specific effect of comorbidity of learning disability (LD) was also investigated. Eighty-three children with ADHD and 29 age-matched controls (age 7-13) participated in the study. A battery of neuropsychological tests was utilized to evaluate specific deficits in speed of processing, selective attention, switching attention, sustained attention, attentional capacity, impulsiveness, planning and problem solving. Findings indicated that children with ADHD have slower verbal responses and sustained attention deficit. Deficits in selective attention and attentional capacity observed were largely related to the presence of LD. No specific deficit associated with ADHD or the comorbidity of LD was identified in switching attention, impulsiveness, planning, and problem solving. These results revealed that ADHD is not associated with a general deficit in executive functioning. Instead, ADHD is related to a specific deficit in regulation for attentional resources. The importance of isolating the deficit related to LDs for examining the specific deficit associated with ADHD is highlighted. Results also emphasised the importance of isolating the effect of lower level of abilities (e.g., speed of processing) and the utilization of specific definition for the examination of executive functions.

  7. Human Resources Staffing Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    BOSLEY, J.W.

    2000-01-01

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline

  8. Assessing Executive Function components in 9 years old children

    Directory of Open Access Journals (Sweden)

    Sandra Reyes

    2014-05-01

    Full Text Available Executive Function (EF is a multidimensional construct. It includes a set of abilities that allows to execute actions with a purpose, aimed to a goal, in an efficient way. The objective of this work is to explore some of the cognitive abilities that constitute a common factor for EF in 9 years-old children. The chosen instruments: Batería de Evaluación Neuropsicológica de la Función Ejecutiva en niños (ENFEN (Battery of Neuropsychological Assessment for Executive Function in Children, along with the Backward Digits Subtestfrom the WISC-III, were administered to 101 children from private schools of Buenos Aires State, Argentina. The ENFEN consists on EF tasks, including Phonological and Semantic Fluency, Trail Making Test versions for children (gray and colored sets, Interference Task, and Planning disc movements according to a model. An initial confirmatory factor analysis didn’t show significant fit indexes, being the Inhibitory control the variable with the lower and non significant factorial weight. A second model excluding the Inhibitory control measure was conducted, and it showed excellent fit indexes. Therefore, it can be concluded that at this age, some of the cognitive abilities included on the EF are: Phonological and Semantic Fluency, Sustained and Selective attention, Planning and Working memory; which is not the case for Inhibitory Control (measured by the Interference Task in the ENFEN.

  9. A Test Platform for Planned Field Operations Using LEGO Mindstorms NXT

    Directory of Open Access Journals (Sweden)

    Gareth Edwards

    2013-11-01

    Full Text Available Testing agricultural operations and management practices associated with different machinery, systems and planning approaches can be both costly and time-consuming. Computer simulations of such systems are used for development and testing; however, to gain the experience of real-world performance, an intermediate step between simulation and full-scale testing should be included. In this paper, a potential common framework using the LEGO Mindstorms NXT micro-tractor platform is described in terms of its hardware and software components. The performance of the platform is demonstrated and tested in terms of its capability of supporting decision making on infield operation planning. The proposed system represents the basic measures for developing a complete test platform for field operations, where route plans, mission plans, multiple-machinery cooperation strategies and machinery coordination can be executed and tested in the laboratory.

  10. U.S. Support of Plan Colombia: Rethinking the Ends and Means

    National Research Council Canada - National Science Library

    Flynn, Stephen

    2001-01-01

    Dr. Stephen Flynn argues that the U.S. emphasis on drug control in its support of Plan Colombia is misguided and akin to prescribing an antibiotic regime to combat a disease not caused by bacteria or similar micro-organisms...

  11. [Modern approaches to the planning of the medical material support in conditions of daily activities].

    Science.gov (United States)

    Miroshnichenko, Iu V; Goriachev, A B; Krasavin, K D; Tikhonov, A V

    2012-07-01

    There are requirements producing to the planning in modem social and economic conditions: solidarity, participation, continuity, flexibility, accuracy. The authors made a conclusion that the main target of the planning of the medical material support is creating of conditions for highly effective function of the system of medical material support on the basis of long-time forecast of status and development of inner and outer factors.

  12. Hanford Site Pollution Prevention Plan progress report, 1994. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This report tracks progress made during 1994 against the goals stated in DOE/RL-92-62, Executive Summary, Hanford Site Pollution Prevention Plan. The Executive Summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, Executive Summary, and the progress reports are elements of a pollution prevention planning program that is required by WAC 173-307, ''Plans,'' for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement RCW 70.95C, ''Waste Reduction,'' an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the in-process reuse or reclamation of valuable spent material. The Hanford Site is voluntarily complying with this state regulatory-mandated program. All treatment, storage, or disposal (TSD) facilities are exempt from participating; the Hanford Site is classified as a TSD

  13. Hanford Site Pollution Prevention Plan progress report, 1994. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This report tracks progress made during 1994 against the goals stated in DOE/RL-92-62, Executive Summary, Hanford Site Pollution Prevention Plan. The Executive Summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, Executive Summary, and the progress reports are elements of a pollution prevention planning program that is required by WAC 173-307, ``Plans,`` for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement RCW 70.95C, ``Waste Reduction,`` an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the in-process reuse or reclamation of valuable spent material. The Hanford Site is voluntarily complying with this state regulatory-mandated program. All treatment, storage, or disposal (TSD) facilities are exempt from participating; the Hanford Site is classified as a TSD.

  14. Enhancing Writing through Strengthened Executive Function

    Directory of Open Access Journals (Sweden)

    Russell Jay Hendel

    2014-10-01

    Full Text Available We explore aspects of essay writing requiring high-level organizational capacity and executive function. The literature supports the approach that specific and focused writing-skill mastery leads to reduced anxiety and increased self-efficacy which correlates with improved writing skills. Although essay writing is a complex multi-dimensional task, two particular strategies, tree-diagram and reference methods, specifically address the organizational skills characteristic of executive function. The tree and reference methods presented in this paper address the flow of information, not content, and consequently, the methods presented in this paper apply to mathematics and English as well as to K-12 and college level.

  15. The role of executive functions in social impairment in Autism Spectrum Disorder.

    Science.gov (United States)

    Leung, Rachel C; Vogan, Vanessa M; Powell, Tamara L; Anagnostou, Evdokia; Taylor, Margot J

    2016-01-01

    Autism Spectrum Disorder (ASD) is a neurodevelopmental disorder characterized by socio-communicative impairments. Executive dysfunction may explain some key characteristics of ASD, both social and nonsocial hallmarks. Limited research exists exploring the relations between executive function and social impairment in ASD and few studies have used a comparison control group. Thus, the objective of the present study was to investigate the relations between executive functioning using the Behavioral Rating Inventory of Executive Functioning (BRIEF), social impairment as measured by the Social Responsiveness Scale (SRS), and overall autistic symptomology as measured by the Autism Diagnostic Observation Schedule (ADOS) in children and adolescents with and without ASD. Seventy children and adolescents diagnosed with ASD and 71 typically developing controls were included in this study. Findings showed that behavioral regulation executive processes (i.e., inhibition, shifting, and emotional control) predicted social function in all children. However, metacognitive executive processes (i.e., initiation, working memory, planning, organization, and monitoring) predicted social function only in children with ASD and not in typically developing children. Our findings suggest a distinct metacognitive executive function-social symptom link in ASD that is not present in the typical population. Understanding components of executive functioning that contribute to the autistic symptomology, particularly in the socio-communicative domain, is crucial for developing effective interventions that target key executive processes as well as underlying behavioral symptoms.

  16. Quality assurance program plan for SNF characterization support project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Spent Nuclear Fuel Characterization Support Project. This QAPP has been developed specifically for the Spent Nuclear Fuel Characterization Support Project, per Letter of Instruction (LOI) from Duke Engineering and Services Company, letter No. DESH-9655870, dated Nov. 22, 1996. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP) and LOI. These activities include installation of sectioning equipment and furnace, surface and subsurface examinations, sectioning for metallography, and element drying and conditioning testing, as well as project related operations within the 327 facility as it relates to the specific activities of this project. General facility activities are covered in other appropriate QA-PPS. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping,1261 and HSRCM-1, Hanford Site Radiological Control Manual. The 327 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a Babcock and Wilcox Hanford Company (BVMC) managed facility. During this transition process existing procedures and documents will be utilized until replaced by BVMC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to IO CFR 830.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be utilized in support of this project and the subject organizations are

  17. ISSUES RELATED TO A REASONABLENESS OF EXECUTIVE COMPENSATION ANALYSIS

    Directory of Open Access Journals (Sweden)

    Angela Eliza MICU

    2006-01-01

    Full Text Available In most companies, there is ongoing conflict between managers in charge of covering costs (finance and accounting and managers in charge of satisfying customers (marketing and sales. Accounting journals warn against prices that fail to cover full costs, while marketing journals argue that customer willingness-to-pay must be the sole driver of prices. This article will further explain these reasons to conduct an independent reasonableness of executive/professional practitioner compensation analysis. In addition, this article will discuss many of the typical factors that the independent analyst will consider in assessing the reasonableness of executive compensation for controversy, taxation, corporate planning, and corporate governance purposes.

  18. 24 CFR 886.334 - Execution of housing assistance payments contract.

    Science.gov (United States)

    2010-04-01

    ... DIRECT LOAN PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE... Market Rent or the exception rent provided in § 886.310 in effect at the time of execution of the...

  19. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  20. Implications of Contingency Planning Support for Weather and Icing Information

    Science.gov (United States)

    Vigeant-Langlois, Laurence; Hansman, R. John, Jr.

    2003-01-01

    A human-centered systems analysis was applied to the adverse aircraft weather encounter problem in order to identify desirable functions of weather and icing information. The importance of contingency planning was identified as emerging from a system safety design methodology as well as from results of other aviation decision-making studies. The relationship between contingency planning support and information on regions clear of adverse weather was investigated in a scenario- based analysis. A rapid prototype example of the key elements in the depiction of icing conditions was developed in a case study, and the implications for the components of the icing information system were articulated.

  1. Automatic Error Recovery in Robot Assembly Operations Using Reverse Execution

    DEFF Research Database (Denmark)

    Laursen, Johan Sund; Schultz, Ulrik Pagh; Ellekilde, Lars-Peter

    2015-01-01

    , in particular for small-batch productions. As an alternative, we propose a system for automatically handling certain classes of errors instead of preventing them. Specifically, we show that many operations can be automatically reversed. Errors can be handled through automatic reverse execution of the control...... program to a safe point, from which forward execution can be resumed. This paper describes the principles behind automatic reversal of robotic assembly operations, and experimentally demonstrates the use of a domain-specific language that supports automatic error handling through reverse execution. Our...

  2. Planning support concept to implementation of sustainable parking development projects in ancient Mediterranean cities

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2014-12-01

    Full Text Available This paper proposes a planning support concept (PSC to implementation of sustainable parking development projects (SPDP in ancient Mediterranean cities. It is conceptualized by the logic of decision support systems and a multicriteria analysis approach. The purpose of the concept is to support setting of implementation priorities for subprojects (construction of new and/or improvement of existing parking within a SPDP. Analysing the existing and a planned state of parking within the city a goal tree is established. Subprojects are defined accordingly. Objectives from the last hierarchy level within the goal tree are used as criteria for assessment of defined subprojects. Representatives of stakeholders provided criteria weights by application of AHP and SAW methods. PROMETHEE II was used for priority ranking and PROMETHEE V ensured a definition of project’s implementation phases. The result of the presented concept is the implementation plan for such projects. The concept is tested on the city of Trogir.

  3. Business Plan for the Southwest Regional Spaceport: Executive Summary

    Science.gov (United States)

    1997-01-01

    A proposal for a commercial, full-service launch, tracking, and recovery complex for Reusable Launch Vehicles in New Mexico is presented. Vision, mission, business definition, competitive advantages, and business approach are formulated. Management plan and team structure are detailed, and anticipated market is described. Finance and marketing plans are presented. Financial analysis is performed.

  4. COLLABORATIVE MULTI-LEVEL PLAN MONITORING

    Directory of Open Access Journals (Sweden)

    Mohamad K. ALLOUCHE

    2011-01-01

    Full Text Available The recent worldwide connectivity and the net-centricity of military operations (coalition-based operations are witnessing an increasing need for the monitoring of plan execution for enhanced resource management and decision making. Monitoring of ongoing operations is the process of continuous observation recording and reporting. In this process the plan becomes a resource that needs to be managed effi ciently. The centralized approach to plan monitoring soon reaches its limits when plan execution is distributed across different organizations/countries. We propose a new framework that would allow different monitoring nodes distributed across the network. An effi cient propagation mechanism that allows information exchange between the different nodes would also be needed. The main purpose of this mechanism is to present the right information, to the right person, at the right time. To cope with a rapid increase of information fl ow through the network, an effi cient alarm management mechanism allows the presentation of the information with an appropriate level of details.

  5. When words lead to solutions: executive function deficits in preschool children with specific language impairment.

    Science.gov (United States)

    Roello, Mara; Ferretti, Maria Letizia; Colonnello, Valentina; Levi, Gabriel

    2015-02-01

    Several studies indicate that school-age children with specific language impairment (SLI) have difficulties with tasks that rely on executive functions. Whether executive function deficits in children with SLI emerge during preschool age remains unclear. Our aim was to fill this gap by investigating executive function performances in two age groups of preschoolers with and without SLI. Children with SLI (N=60; young: 53.6±5.3 months; old: 65.4±3.8 months) and age-matched control children (N=58) were tested for problem-representation ability, using the Flexible Item Selection Task (FIST), rule-use skills, using a Stroop-like Day-Night test (D/N), and planning skills, using the Tower of London test (TOL). Older children performed better than younger children did across tasks. Children with SLI had poorer performance, compared to typically developing children, on measures of problem representation, planning skills, and use of rules. Our results clearly indicate that executive function impairment is evident during the preschool period. Although old children with SLI performed better than young children with SLI, their performances were still poor, compared to those of control peers. These findings suggest that children with SLI have altered executive functioning at 53.6 months. Copyright © 2014. Published by Elsevier Ltd.

  6. Gender and rapid alterations of hemispheric dominance during planning.

    Science.gov (United States)

    Schuepbach, Daniel; Skotchko, Tatjana; Duschek, Stefan; Theodoridou, Anastasia; Grimm, Simone; Boeker, Heinz; Seifritz, Erich

    2012-01-01

    Mental planning and carrying out a plan provoke specific cerebral hemodynamic responses. Gender aspects of hemispheric laterality using rapid cerebral hemodynamics have not been reported. Here, we applied functional transcranial Doppler sonography to examine lateralization of cerebral hemodynamics of the middle cerebral arteries of 28 subjects (14 women and 14 men) performing a standard planning task. There were easy and difficult problems, and mental planning without motor activity was separated from movement execution. Difficult mental planning elicited lateralization to the right hemisphere after 2 or more seconds, a feature that was not observed during movement execution. In females, there was a dominance to the left hemisphere during movement execution. Optimized problem solving yielded an increased laterality change to the right during mental planning. Gender-related hemispheric dominance appears to be condition-dependent, and change of laterality to the right may play a role in optimized performance. Results are of relevance when considering laterality from a perspective of performance enhancement of higher cognitive functions, and also of psychiatric disorders with cognitive dysfunctions and abnormal lateralization patterns such as schizophrenia. Copyright © 2012 S. Karger AG, Basel.

  7. North Slope Decision Support for Water Resource Planning and Management

    Energy Technology Data Exchange (ETDEWEB)

    Schnabel, William; Brumbelow, Kelly

    2013-03-31

    The objective of this project was to enhance the water resource decision-making process with respect to oil and gas exploration/production activities on Alaska’s North Slope. To this end, a web-based software tool was developed to allow stakeholders to assemble, evaluate, and communicate relevant information between and amongst themselves. The software, termed North Slope Decision Support System (NSDSS), is a visually-referenced database that provides a platform for running complex natural system, planning, and optimization models. The NSDSS design was based upon community input garnered during a series of stakeholder workshops, and the end product software is freely available to all stakeholders via the project website. The tool now resides on servers hosted by the UAF Water and Environmental Research Center, and will remain accessible and free-of-charge for all interested stakeholders. The development of the tool fostered new advances in the area of data evaluation and decision support technologies, and the finished product is envisioned to enhance water resource planning activities on Alaska’s North Slope.

  8. Writing executable assertions to test flight software

    Science.gov (United States)

    Mahmood, A.; Andrews, D. M.; Mccluskey, E. J.

    1984-01-01

    An executable assertion is a logical statement about the variables or a block of code. If there is no error during execution, the assertion statement results in a true value. Executable assertions can be used for dynamic testing of software. They can be employed for validation during the design phase, and exception and error detection during the operation phase. The present investigation is concerned with the problem of writing executable assertions, taking into account the use of assertions for testing flight software. They can be employed for validation during the design phase, and for exception handling and error detection during the operation phase The digital flight control system and the flight control software are discussed. The considered system provides autopilot and flight director modes of operation for automatic and manual control of the aircraft during all phases of flight. Attention is given to techniques for writing and using assertions to test flight software, an experimental setup to test flight software, and language features to support efficient use of assertions.

  9. Requirements for advanced decision support tools in future distribution network planning

    NARCIS (Netherlands)

    Grond, M.O.W.; Morren, J.; Slootweg, J.G.

    2013-01-01

    This paper describes the need and requirements for advanced decision support tools in future network planning from a distribution network operator perspective. The existing tools will no longer be satisfactory for future application due to present developments in the electricity sector that increase

  10. Emergency preparedness 1995 site support plan WBS 6.7.2.3

    International Nuclear Information System (INIS)

    Faulk, S.M.

    1994-09-01

    The Emergency Preparedness Program provides an emergency management system including occurrence notification; development, coordination, and direction of planning, preparedness, and readiness assurance for response to emergency events on the Hanford Site; and emergency management support to Department of Energy, Richland Operations Office (RL)

  11. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    International Nuclear Information System (INIS)

    Fritz, R.L.

    1995-01-01

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities

  12. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Fritz, R.L.

    1995-01-11

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities.

  13. AVLIS production plant waste management plan

    International Nuclear Information System (INIS)

    1984-01-01

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables

  14. Repetitive thinking, executive functioning, and depressive mood in the elderly.

    Science.gov (United States)

    Philippot, Pierre; Agrigoroaei, Stefan

    2017-11-01

    Previous findings and the depressive-executive dysfunction hypothesis suggest that the established association between executive functioning and depression is accounted for by repetitive thinking. Investigating the association between executive functioning, repetitive thinking, and depressive mood, the present study empirically tested this mediational model in a sample of older adults, while focusing on both concrete and abstract repetitive thinking. This latter distinction is important given the potential protective role of concrete repetitive thinking, in contrast to the depletive effect of abstract repetitive thinking. A sample of 43 elderly volunteers, between 75 and 95 years of age, completed tests of executive functioning (the Stroop test, the Trail Making test, and the Fluency test), and questionnaires of repetitive thinking and depression. Positive correlations were observed between abstract repetitive thinking and depressive mood, and between concrete repetitive thinking and executive functioning; a negative correlation was observed between depressive mood and executive functioning. Further, mediational analysis evidenced that the relation between executive functioning and depressive mood was mediated by abstract repetitive thinking. The present data provide, for the first time, empirical support to the depressive-executive dysfunction hypothesis: the lack of executive resources would favor a mode of abstract repetitive thinking, which in turn would deplete mood. It suggests that clinical intervention targeting depression in the elderly should take into consideration repetitive thinking modes and the executive resources needed to disengage from rumination.

  15. Supporting strategic spatial planning : planning support systems for the spatial planning of metropolitan landscapes

    NARCIS (Netherlands)

    Carsjens, G.J.

    2009-01-01

    Een belangrijke opgave voor de ruimtelijke planning is en balans te vinden tussen de toegenomen druk op de open groene ruimte door verstedelijking en economische ontwikkeling enerzijds, en de noodzaak van het behouden van deze landelijke gebieden voor natuur, recreatie, landschap en voedselproductie

  16. Exact and approximate probabilistic symbolic execution for nondeterministic programs

    DEFF Research Database (Denmark)

    Luckow, Kasper Søe; Păsăreanu, Corina S.; Dwyer, Matthew B.

    2014-01-01

    Probabilistic software analysis seeks to quantify the likelihood of reaching a target event under uncertain environments. Recent approaches compute probabilities of execution paths using symbolic execution, but do not support nondeterminism. Nondeterminism arises naturally when no suitable probab...... Java programs. We show that our algorithms significantly improve upon a state-of-the-art statistical model checking algorithm, originally developed for Markov Decision Processes....... probabilistic model can capture a program behavior, e.g., for multithreading or distributed systems. In this work, we propose a technique, based on symbolic execution, to synthesize schedulers that resolve nondeterminism to maximize the probability of reaching a target event. To scale to large systems, we also...

  17. Can the Army Provide Bulk Petroleum Support to Joint Force 2020?

    Science.gov (United States)

    2013-03-01

    Petroleum Officer (JPO) and one or more Sub Area Petroleum Officers ( SAPO ). The JPO coordinates petroleum support to all forces in a theater on behalf...position is the SAPO , established by the Combatant Commander or a Joint Force Commander (JFC) to fulfill bulk petroleum planning and execution in a...section of the theater for which the JPO is responsible.7 A key duty of the SAPO is to advise the JFC and his/her staff on petroleum logistics

  18. 1994 Site Development Plan: A plan with vision

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The 1994 Lawrence Livermore National Laboratory Site Development Plan has been developed during a period of great change and uncertainty. Our goal is to make possible the best use of the Laboratory`s resources to meet shifting national priorities in the post-Cold War world. Site Planning is an important component of the overall Laboratory strategic planning process. This plan focuses on opportunities for the Laboratory as well as on key site development issues including facility construction, redevelopment and reuse, site accessibility, and security. A major challenge is to achieve sufficient stability in the site planning and execution so that the processes of construction can occur efficiently while at the same time providing sufficient flexibility in site facilities so that a range of changing national needs can be accommodated. We are closely coupled to the DOE strategic planning process to meet this challenge.

  19. Developmental trajectories of fronto-executive functions in 22q11.2 deletion syndrome: A preliminary study

    LENUS (Irish Health Repository)

    Howley, S A

    2011-01-01

    22qll.2 deletion syndrome (22qllDS) is associated with borderline-mild intellectual disability and specific neurocognitive deficits, particularly in prefrontally-mediated executive functions (EF). There is evidence for white matter abnormalities in frontal cortical regions in 22qllDS, however little is known about the development of EF across the age range. Forty-eight individuals with 22qllDS were divided into 3 age groups: Child (7 male; n = 16; 6–11 years; M (SD) age = 8.4 (1.7); mean FSIQ = 72.9); Adolescent (7 male; n = 15; 12–15 years; M (SD) age = 13.1 (0.8); mean FSIQ = 68.0) and Adult (7 male; n = 17; 16–45 years; M (SD) age = 28.8 (11.5); mean FSIQ = 69.6). Forty healthy controls were also recruited and divided into the same 3 age groups: Child (6 male; 6–11 years, n = 12; M (SD) age = 9.3 (1.7); mean FSIQ = 99.1); Adolescent (6 male; 12–15 years; n = 12; M (SD) age = 13.2 (1.1); mean FSIQ = 100.9) and Adult (6 male; 16–45 years; n = 16; M (SD) age = 28.8 (9.4); mean FSIQ = 109). All participants completed standardised tests of a range of executive functions, specifically working memory, planning, problem-solving, strategy formation, cognitive flexibility and inhibition, and cross-sectional developmental trajectories of each function were constructed. No age-mediated improvements on EF tasks were observed in the 22qllDS groups, with the exception of verbal working memory. The control group exhibited significant age-mediated improvements in working memory, strategy formation and planning efficiency. These findings support the hypothesis that 22qllDS individuals experience atypical development of neuroanatomical regions and networks associated with EF in typical individuals. Future longitudinal work is required to examine intra-individual development of executive and non-executive cognitive processes.

  20. Joomla! Start to Finish How to Plan, Execute, and Maintain Your Web Site

    CERN Document Server

    Kramer, Jen

    2010-01-01

    There is much more to building a great web site than just downloading and installing Joomla!. This book provides crucial content on planning the website, before launching into the technology steps. It will show the reader how to analyze the client company's strategy and how to find out how the organization wants itself reflected and supported by the web site. Then it will cover the right technological solutions to the problems and getting the site structure organized via a site map.  All of this is done before you establish hosting or install Joomla!. Once the technology steps are established,

  1. Automated procedure execution for space vehicle autonomous control

    Science.gov (United States)

    Broten, Thomas A.; Brown, David A.

    1990-01-01

    Increased operational autonomy and reduced operating costs have become critical design objectives in next-generation NASA and DoD space programs. The objective is to develop a semi-automated system for intelligent spacecraft operations support. The Spacecraft Operations and Anomaly Resolution System (SOARS) is presented as a standardized, model-based architecture for performing High-Level Tasking, Status Monitoring and automated Procedure Execution Control for a variety of spacecraft. The particular focus is on the Procedure Execution Control module. A hierarchical procedure network is proposed as the fundamental means for specifying and representing arbitrary operational procedures. A separate procedure interpreter controls automatic execution of the procedure, taking into account the current status of the spacecraft as maintained in an object-oriented spacecraft model.

  2. The most frequently used tests for assessing executive functions in aging

    Directory of Open Access Journals (Sweden)

    Camila de Assis Faria

    Full Text Available There are numerous neuropsychological tests for assessing executive functions in aging, which vary according to the different domains assessed. OBJECTIVE: To present a systematic review of the most frequently used instruments for assessing executive functions in older adults with different educational levels in clinical and experimental research. METHODS: We searched for articles published in the last five years, using the PubMed database with the following terms: "neuropsychological tests", "executive functions", and "mild cognitive impairment". There was no language restriction. RESULTS: 25 articles fulfilled all the inclusion criteria. The seven neuropsychological tests most frequently used to evaluate executive functions in aging were: [1] Trail Making Test (TMT Form B; [2] Verbal Fluency Test (VFT - F, A and S; [3] VFT Animals category; [4] Clock Drawing Test (CDT; [5] Digits Forward and Backward subtests (WAIS-R or WAIS-III; [6] Stroop Test; and [7] Wisconsin Card Sorting Test (WCST and its variants. The domains of executive functions most frequently assessed were: mental flexibility, verbal fluency, planning, working memory, and inhibitory control. CONCLUSION: The study identified the tests and domains of executive functions most frequently used in the last five years by research groups worldwide to evaluate older adults. These results can direct future research and help build evaluation protocols for assessing executive functions, taking into account the different educational levels and socio-demographic profiles of older adults in Brazil.

  3. An interactive water indicator assessment tool to support land use planning

    NARCIS (Netherlands)

    Hellegers, P.J.G.J.; Jansen, H.C.; Bastiaanssen, W.G.M.

    2012-01-01

    This paper presents an interactive web-based rapid assessment tool that generates key water related indicators to support decision making by stakeholders in land use planning. The tool is built on a consistent science based method that combines remote sensing with hydrological and socioeconomic

  4. Integrated Facilities and Infrastructure Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Reisz Westlund, Jennifer Jill

    2017-03-01

    Our facilities and infrastructure are a key element of our capability-based science and engineering foundation. The focus of the Integrated Facilities and Infrastructure Plan is the development and implementation of a comprehensive plan to sustain the capabilities necessary to meet national research, design, and fabrication needs for Sandia National Laboratories’ (Sandia’s) comprehensive national security missions both now and into the future. A number of Sandia’s facilities have reached the end of their useful lives and many others are not suitable for today’s mission needs. Due to the continued aging and surge in utilization of Sandia’s facilities, deferred maintenance has continued to increase. As part of our planning focus, Sandia is committed to halting the growth of deferred maintenance across its sites through demolition, replacement, and dedicated funding to reduce the backlog of maintenance needs. Sandia will become more agile in adapting existing space and changing how space is utilized in response to the changing requirements. This Integrated Facilities & Infrastructure (F&I) Plan supports the Sandia Strategic Plan’s strategic objectives, specifically Strategic Objective 2: Strengthen our Laboratories’ foundation to maximize mission impact, and Strategic Objective 3: Advance an exceptional work environment that enables and inspires our people in service to our nation. The Integrated F&I Plan is developed through a planning process model to understand the F&I needs, analyze solution options, plan the actions and funding, and then execute projects.

  5. Personalised Care Plan Management Utilizing Guideline-Driven Clinical Decision Support Systems.

    Science.gov (United States)

    Laleci Erturkmen, Gokce Banu; Yuksel, Mustafa; Sarigul, Bunyamin; Lilja, Mikael; Chen, Rong; Arvanitis, Theodoros N

    2018-01-01

    Older age is associated with an increased accumulation of multiple chronic conditions. The clinical management of patients suffering from multiple chronic conditions is very complex, disconnected and time-consuming with the traditional care settings. Integrated care is a means to address the growing demand for improved patient experience and health outcomes of multimorbid and long-term care patients. Care planning is a prevalent approach of integrated care, where the aim is to deliver more personalized and targeted care creating shared care plans by clearly articulating the role of each provider and patient in the care process. In this paper, we present a method and corresponding implementation of a semi-automatic care plan management tool, integrated with clinical decision support services which can seamlessly access and assess the electronic health records (EHRs) of the patient in comparison with evidence based clinical guidelines to suggest personalized recommendations for goals and interventions to be added to the individualized care plans.

  6. Spatial decision support for strategic environmental assessment of land use plans. A case study in southern Italy

    International Nuclear Information System (INIS)

    Geneletti, Davide; Bagli, Stefano; Napolitano, Paola; Pistocchi, Alberto

    2007-01-01

    This paper presents and discusses the construction of a spatial decision-support tool for the Strategic Environmental Assessment (SEA) of a land use plan: the spatial coordination plan of the Province of Naples, in southern Italy. The decision-support tool organises the relevant information, spatially resolves the actions of the plan, predicts their environmental impacts, and generates overall performance maps. Its final goal is to provide a suitable technical support to a formal SEA procedure. The expected implications of the plan, such as changes in land use and traffic flows and urban expansion, were modelled and assessed against a set of environmental criteria using SWOT (Strengths, Weaknesses, Opportunities and Threats) analysis and mapping. It was found that the SWOT analysis provided a good basis for assessment and strategy formulation. The paper also intends to contribute to the topic of data and scale issues in SEA, by exemplifying the role played by spatial data and spatial analyses to support informative SEA

  7. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  8. SU-D-BRD-07: Automatic Patient Data Audit and Plan Quality Check to Support ARIA and Eclipse

    Energy Technology Data Exchange (ETDEWEB)

    Li, X; Li, H; Wu, Y; Mutic, S; Yang, D [Washington University School of Medicine, St. Louis, MO (United States)

    2014-06-01

    Purpose: To ensure patient safety and treatment quality in RT departments that use Varian ARIA and Eclipse, we developed a computer software system and interface functions that allow previously developed electron chart checking (EcCk) methodologies to support these Varian systems. Methods: ARIA and Eclipse store most patient information in its MSSQL database. We studied the contents in the hundreds database tables and identified the data elements used for patient treatment management and treatment planning. Interface functions were developed in both c-sharp and MATLAB to support data access from ARIA and Eclipse servers using SQL queries. These functions and additional data processing functions allowed the existing rules and logics from EcCk to support ARIA and Eclipse. Dose and structure information are important for plan quality check, however they are not stored in the MSSQL database but as files in Varian private formats, and cannot be processed by external programs. We have therefore implemented a service program, which uses the DB Daemon and File Daemon services on ARIA server to automatically and seamlessly retrieve dose and structure data as DICOM files. This service was designed to 1) consistently monitor the data access requests from EcCk programs, 2) translate the requests for ARIA daemon services to obtain dose and structure DICOM files, and 3) monitor the process and return the obtained DICOM files back to EcCk programs for plan quality check purposes. Results: EcCk, which was previously designed to only support MOSAIQ TMS and Pinnacle TPS, can now support Varian ARIA and Eclipse. The new EcCk software has been tested and worked well in physics new start plan check, IMRT plan integrity and plan quality checks. Conclusion: Methods and computer programs have been implemented to allow EcCk to support Varian ARIA and Eclipse systems. This project was supported by a research grant from Varian Medical System.

  9. SU-D-BRD-07: Automatic Patient Data Audit and Plan Quality Check to Support ARIA and Eclipse

    International Nuclear Information System (INIS)

    Li, X; Li, H; Wu, Y; Mutic, S; Yang, D

    2014-01-01

    Purpose: To ensure patient safety and treatment quality in RT departments that use Varian ARIA and Eclipse, we developed a computer software system and interface functions that allow previously developed electron chart checking (EcCk) methodologies to support these Varian systems. Methods: ARIA and Eclipse store most patient information in its MSSQL database. We studied the contents in the hundreds database tables and identified the data elements used for patient treatment management and treatment planning. Interface functions were developed in both c-sharp and MATLAB to support data access from ARIA and Eclipse servers using SQL queries. These functions and additional data processing functions allowed the existing rules and logics from EcCk to support ARIA and Eclipse. Dose and structure information are important for plan quality check, however they are not stored in the MSSQL database but as files in Varian private formats, and cannot be processed by external programs. We have therefore implemented a service program, which uses the DB Daemon and File Daemon services on ARIA server to automatically and seamlessly retrieve dose and structure data as DICOM files. This service was designed to 1) consistently monitor the data access requests from EcCk programs, 2) translate the requests for ARIA daemon services to obtain dose and structure DICOM files, and 3) monitor the process and return the obtained DICOM files back to EcCk programs for plan quality check purposes. Results: EcCk, which was previously designed to only support MOSAIQ TMS and Pinnacle TPS, can now support Varian ARIA and Eclipse. The new EcCk software has been tested and worked well in physics new start plan check, IMRT plan integrity and plan quality checks. Conclusion: Methods and computer programs have been implemented to allow EcCk to support Varian ARIA and Eclipse systems. This project was supported by a research grant from Varian Medical System

  10. Development of Design Technology on Thermal-Hydraulic Performance in Tight-Lattice Rod Bundles: I-Master Plan and Executive Summary

    Science.gov (United States)

    Ohnuki, Akira; Kureta, Masatoshi; Yoshida, Hiroyuki; Tamai, Hidesada; Liu, Wei; Misawa, Takeharu; Takase, Kazuyuki; Akimoto, Hajime

    R&D project to investigate thermal-hydraulic performance in tight-lattice rod bundles for Innovative Water Reactor for Flexible Fuel Cycle has been progressed at Japan Atomic Energy Agency in collaboration with power utilities, reactor vendors and universities since 2002. In this series-study, we will summarize the R&D achievements using large-scale test facility (37-rod bundle with full-height and full-pressure), model experiments and advanced numerical simulation technology. This first paper described the master plan for the development of design technology and showed an executive summary for this project up to FY2005. The thermal-hydraulic characteristics in the tight-lattice configuration were investigated and the feasibility was confirmed based on the experiments. We have developed the design technology including 3-D numerical simulation one to evaluate the effects of geometry/scale on the thermal-hydraulic behaviors.

  11. Planning manual for energy resource development on Indian lands. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-01

    This report is the Executive Summary for the other 5 volumes of the Study Report--see TID-28526/1-5. Information is provided here that the tribes can use to make energy-development decisions. The report is particularly concerned with management responsibilities and financial commitments that development will require on the part of the tribes and with the types of information and skilled personnel the tribes will need in the future to make informed decisions.

  12. Program Execution on Reconfigurable Multicore Architectures

    Directory of Open Access Journals (Sweden)

    Sanjiva Prasad

    2016-06-01

    Full Text Available Based on the two observations that diverse applications perform better on different multicore architectures, and that different phases of an application may have vastly different resource requirements, Pal et al. proposed a novel reconfigurable hardware approach for executing multithreaded programs. Instead of mapping a concurrent program to a fixed architecture, the architecture adaptively reconfigures itself to meet the application's concurrency and communication requirements, yielding significant improvements in performance. Based on our earlier abstract operational framework for multicore execution with hierarchical memory structures, we describe execution of multithreaded programs on reconfigurable architectures that support a variety of clustered configurations. Such reconfiguration may not preserve the semantics of programs due to the possible introduction of race conditions arising from concurrent accesses to shared memory by threads running on the different cores. We present an intuitive partial ordering notion on the cluster configurations, and show that the semantics of multithreaded programs is always preserved for reconfigurations "upward" in that ordering, whereas semantics preservation for arbitrary reconfigurations can be guaranteed for well-synchronised programs. We further show that a simple approximate notion of efficiency of execution on the different configurations can be obtained using the notion of amortised bisimulations, and extend it to dynamic reconfiguration.

  13. Functional Behavioral Assessments and Behavior Support Plans for Work-Based Learning

    Science.gov (United States)

    Kittelman, Angus; Wagner Bromley, Katherine; Mazzotti, Valerie L.

    2016-01-01

    Work experiences are linked to positive post-school outcomes for youth and young adults with disabilities. Unfortunately, students who struggle to manage conflict and challenges in work settings have a difficult time maintaining employment. Though ecological assessments are used to create supported work plans surrounding socially inappropriate…

  14. Demystifying the Business Plan Process: An Introductory Guide.

    Science.gov (United States)

    Kuratko, Donald F.

    This article is designed as the starting point for writing a business plan. It first describes what a business plan is. These benefits are discussed: financing, increasing knowledge, preventing poor investment, and planning. A brief description follows of the 10 components of a business plan: executive summary; business description; marketing;…

  15. National Ignition Facility (NIF) FY2015 Facility Use Plan

    Energy Technology Data Exchange (ETDEWEB)

    Folta, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wisoff, Jeff [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2014-12-18

    Major features of the FY2015 NIF Use Plan include: • Performing a record number of layered DT experiments with 28 planned compared with 15 in FY2014. Executing the first plutonium experiments on the NIF in support of the Science Campaigns. • Over 300 targets shots, a 57% increase compared to FY14. This is a stretch goal defined in the 120-Day Study document, and relies upon the success of many shot-rate improvement actions, as well as on the distribution of shot type selected by the users. While the Plan is consistent with this goal, the increased proportion of layered DT experiments described above reduces the margin against this goal. • Commissioning of initial ARC capability, which will support both SSP-HED and SSPICF programs. • Increase in days allocated to Discovery Science to a level that supports an ongoing program for academic use of NIF and an annual solicitation for new proposals. • Six Facility Maintenance and Reconfiguration (FM&R) periods totaling 30 days dedicated to major facility maintenance and modifications. • Utilization of the NIF Facility Advisory Schedule Committee (FASC) to provide stakeholder review and feedback on the NIF schedule. The Use Plan assumes a total FY2015 LLNL NIF Operations funding in MTE 10.7 of $229.465M and in MTE 10.3 of 47.0M. This Use Plan will be revised in the event of significant changes to the FY2015 funding or if NNSA provides FY2016 budget guidance significantly reduced compared to FY2015.

  16. Self-reports of executive dysfunction in current ecstasy/polydrug Users.

    Science.gov (United States)

    Hadjiefthyvoulou, Florentia; Fisk, John E; Montgomery, Catharine; Bridges, Nikola

    2012-09-01

    Ecstasy/polydrug users have exhibited deficits in executive functioning in laboratory tests. We sought to extend these findings by investigating the extent to which ecstasy/polydrug users manifest executive deficits in everyday life. Forty-two current ecstasy/polydrug users, 18 previous (abstinent for at least 6 months) ecstasy/polydrug users, and 50 non-users of ecstasy (including both non-users of any illicit drug and some cannabis-only users) completed the self-report Behavior Rating Inventory of Executive Function-Adult Version (BRIEF-A) measure. Current ecstasy/polydrug users performed significantly worse than previous users and non-users on subscales measuring inhibition, self-monitoring, initiating action, working memory, planning, monitoring ongoing task performance, and organizational ability. Previous ecstasy/polydrug users did not differ significantly from non-users. In regression analyses, although the current frequency of ecstasy use accounted for statistically significant unique variance on 3 of the 9 BRIEF-A subscales, daily cigarette consumption was the main predictor in 6 of the subscales. Current ecstasy/polydrug users report more executive dysfunction than do previous users and non-users. This finding appears to relate to some aspect of ongoing ecstasy use and seems largely unrelated to the use of other illicit drugs. An unexpected finding was the association of current nicotine consumption with executive dysfunction.

  17. Teleradiology in Southeast Iran: Evaluating the Views of Senior Executives and Radiologists.

    Science.gov (United States)

    Sadoughi, Farahnaz; Erfannia, Leila; Sancholi, Mahboobe; Salmani, Fatemeh; Sarsarshahi, Aida

    Teleradiology is considered as one of the important forms of telemedicine. Positive views of the users and providers of these services play an important role in its successful implementations. The aim of this study was to investigate the views of radiologists used in the radiology departments of teaching hospitals in the Zahedan University of Medical Sciences through teleradiology, as well as evaluate the executive possibility of teleradiology in these hospitals by the views of chief executive officer and comparison between these two views. The current cross-sectional research was performed in 2014 at Zahedan teaching hospitals. The views of 13 chief executive officers on the possibility of the execution of teleradiology and 26 radiologists on the teleradiology process were evaluated by means of two valid and reliable questionnaires. The results of the research revealed that most of the radiologists had knowledge of and positive opinions about teleradiology. Conversely, the view by chief executive officers was that implementation of these processes was not possible in the studied hospitals. Dealing with some issues including data security, controlling or restricting access to clinical information of patients during the process of teleradiology, the possibility of legal protection for the participating radiologists, constitution of executive teams in the organization along with the financial supports, and, subsequently, invitation of the supports from the chief executive officers as the main sponsors of teleradiology implementation in the teaching hospitals are all guidelines for improvement of the successful implementation of teleradiology.

  18. Decision-making and planning in full recovery of anorexia nervosa.

    Science.gov (United States)

    Lindner, Susanne E; Fichter, Manfred M; Quadflieg, Norbert

    2012-11-01

    Based on findings of persisting neuropsychological impairments in women recovered from anorexia nervosa (rec AN), this study examined decision-making and planning, for achieving a desired goal, as central executive functions in a large sample of rec AN. The definition of recovery included physiological, behavioral, and psychological variables. A total of 100 rec AN women were compared to 100 healthy women, 1:1 matched for age and educational level. Decision-making was assessed with the Iowa Gambling Task and planning with the Tower of London. Expert interviews and self-ratings were used for assessing the inclusion/exclusion criteria and control variables. Compared to healthy controls, rec AN women were better in decision-making and worse in planning even after considering control variables. This study does not support results from other studies showing that rec AN participants perform better in decision-making. Results from this study show that planning is impaired even after full recovery from AN. Copyright © 2012 Wiley Periodicals, Inc.

  19. Project Execution Plan

    International Nuclear Information System (INIS)

    1999-01-01

    Created in 1989 to address over 50 years of environmental liabilities arising out of nuclear weapons production and testing in the United States since World War II, the U.S. Department of Energy's (DOE's) Environmental Management (EM) Programs decade-long effort to reduce the costs of those environmental liabilities, collectively known as DOE's ''environmental mortgage,'' includes past as well as future cleanup costs associated with environmental contamination, hazardous and radioactive materials and wastes, contaminated buildings and facilities, and their associated risks. Tasked with the bulk of these cleanup efforts, the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's), Nevada Environmental Restoration Project (NV ERP) is attempting to complete applicable corrective actions at inactive contaminated sites and facilities managed by DOE/NV, while at the same time protecting human health and the environment. Regulated under the Federal Facility Agreement and Consent Order, the objectives of the NV ERP are to identify the nature and extent of the contamination, determine its potential risk to the public and the environment, and to perform the necessary corrective actions in compliance with this and other state and federal regulations, guidelines, and requirements. Associated with this vast effort are approximately 2,000 sites both on and off of the Nevada Test Site (NTS) that were used primarily for nuclear testing and are addressed in the NV ERP. This includes sites that were underground areas where tests were actually conducted, contaminated surface soils resulting from aboveground testing activities, and sites that supported other related testing hardware paraphenalia and/or NTS real estate properties (e.g., underground storage tanks, leachfields, landfills, contaminated waste areas, injection wells, muckpiles, and ponds). To assist in this effort, a NV ERP Team was assembled which is composed of organizations from both the public and private

  20. Strategic planning for neuroradiologists.

    Science.gov (United States)

    Berlin, Jonathan W; Lexa, Frank J

    2012-08-01

    Strategic planning is becoming essential to neuroradiology as the health care environment continues to emphasize cost efficiency, teamwork and collaboration. A strategic plan begins with a mission statement and vision of where the neuroradiology division would like to be in the near future. Formalized strategic planning frameworks, such as the strengths, weaknesses, opportunities and threats (SWOT), and the Balanced Scorecard frameworks, can help neuroradiology divisions determine their current position in the marketplace. Communication, delegation, and accountability in neuroradiology is essential in executing an effective strategic plan. Copyright © 2012 Elsevier Inc. All rights reserved.

  1. Unpacking the Complexity of Planning with Persons with Cognitive Disability and Complex Support Needs

    Science.gov (United States)

    Collings, Susan; Dew, Angela; Dowse, Leanne

    2018-01-01

    Background: Planners will engage with people with cognitive disability and complex support needs in the Australian National Disability Insurance Scheme, but the specific skills needed to build sustainable plans with this group are not yet known. Method: A qualitative study was conducted to explore the barriers and facilitators to planning with…

  2. Stakeholders' Perception as Support for Forest Landscape Planning

    Directory of Open Access Journals (Sweden)

    Isabella De Meo

    2011-01-01

    Full Text Available Social sustainability is a key concept introduced in recent decades by international environmental and forestry policies. The paper illustrates the process of stakeholder consultation for the definition of the objectives of the forest landscape plan conducted in a district of the Italian Apennines. Special attention was given to the farmers group, by reason of the great importance of wood pasture in the management system of this area. The results show that the majority of the interviewees feel a strong bond with their territory and with the traditional activities still carried out there, such as forest grazing. However, there are internal differences within the group, mostly linked to age and territory of origin. The multiple correspondence analysis (MCA supported the investigation of these differences and the analysis of the relationship between farmers and their territory. Information emerged from the interviews with farmers allowed a better understanding of the dynamics of the territory and was revealed to be useful for the development of the forest landscape plan.

  3. Web service composition: a semantic web and automated planning technique application

    Directory of Open Access Journals (Sweden)

    Jaime Alberto Guzmán Luna

    2008-09-01

    Full Text Available This article proposes applying semantic web and artificial intelligence planning techniques to a web services composition model dealing with problems of ambiguity in web service description and handling incomplete web information. The model uses an OWL-S services and implements a planning technique which handles open world semantics in its reasoning process to resolve these problems. This resulted in a web services composition system incorporating a module for interpreting OWL-S services and converting them into a planning problem in PDDL (a planning module handling incomplete information and an execution service module concurrently interacting with the planner for executing each composition plan service.

  4. Dopamine and the development of executive dysfunction in autism spectrum disorders.

    Science.gov (United States)

    Kriete, Trenton; Noelle, David C

    2015-01-01

    Persons with autism regularly exhibit executive dysfunction (ED), including problems with deliberate goal-directed behavior, planning, and flexible responding in changing environments. Indeed, this array of deficits is sufficiently prominent to have prompted a theory that executive dysfunction is at the heart of these disorders. A more detailed examination of these behaviors reveals, however, that some aspects of executive function remain developmentaly appropriate. In particular, while people with autism often have difficulty with tasks requiring cognitive flexibility, their fundamental cognitive control capabilities, such as those involved in inhibiting an inappropriate but relatively automatic response, show no significant impairment on many tasks. In this article, an existing computational model of the prefrontal cortex and its role in executive control is shown to explain this dichotomous pattern of behavior by positing abnormalities in the dopamine-based modulation of frontal systems in individuals with autism. This model offers excellent qualitative and quantitative fits to performance on standard tests of cognitive control and cognitive flexibility in this clinical population. By simulating the development of the prefrontal cortex, the computational model also offers a potential explanation for an observed lack of executive dysfunction early in life.

  5. Dopamine and the development of executive dysfunction in autism spectrum disorders.

    Directory of Open Access Journals (Sweden)

    Trenton Kriete

    Full Text Available Persons with autism regularly exhibit executive dysfunction (ED, including problems with deliberate goal-directed behavior, planning, and flexible responding in changing environments. Indeed, this array of deficits is sufficiently prominent to have prompted a theory that executive dysfunction is at the heart of these disorders. A more detailed examination of these behaviors reveals, however, that some aspects of executive function remain developmentaly appropriate. In particular, while people with autism often have difficulty with tasks requiring cognitive flexibility, their fundamental cognitive control capabilities, such as those involved in inhibiting an inappropriate but relatively automatic response, show no significant impairment on many tasks. In this article, an existing computational model of the prefrontal cortex and its role in executive control is shown to explain this dichotomous pattern of behavior by positing abnormalities in the dopamine-based modulation of frontal systems in individuals with autism. This model offers excellent qualitative and quantitative fits to performance on standard tests of cognitive control and cognitive flexibility in this clinical population. By simulating the development of the prefrontal cortex, the computational model also offers a potential explanation for an observed lack of executive dysfunction early in life.

  6. Benchmarking motion planning algorithms for bin-picking applications

    DEFF Research Database (Denmark)

    Iversen, Thomas Fridolin; Ellekilde, Lars-Peter

    2017-01-01

    Purpose For robot motion planning there exists a large number of different algorithms, each appropriate for a certain domain, and the right choice of planner depends on the specific use case. The purpose of this paper is to consider the application of bin picking and benchmark a set of motion...... planning algorithms to identify which are most suited in the given context. Design/methodology/approach The paper presents a selection of motion planning algorithms and defines benchmarks based on three different bin-picking scenarios. The evaluation is done based on a fixed set of tasks, which are planned...... and executed on a real and a simulated robot. Findings The benchmarking shows a clear difference between the planners and generally indicates that algorithms integrating optimization, despite longer planning time, perform better due to a faster execution. Originality/value The originality of this work lies...

  7. 48 CFR 212.503 - Applicability of certain laws to executive agency contracts for the acquisition of commercial items.

    Science.gov (United States)

    2010-10-01

    ... laws to executive agency contracts for the acquisition of commercial items. 212.503 Section 212.503... ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to the Acquisition of Commercial Items 212.503 Applicability of certain laws to executive agency contracts for the acquisition of...

  8. Support to the Air Force Installation and Mission Support Center: Enabling AFIMSC’s Role in Agile Combat Support Planning, Execution, Monitoring, and Control

    Science.gov (United States)

    2017-06-23

    development, test, and evaluation; and supply chain management —and also quality-of-life support to military members, their families, retirees, and so on...AFIMSC and Air Education and Training Command Director of Logistics (AETC/A4) at a time when AFIMSC was being established to focus on managing the...operations of new ACS global management organizations.3 1 Program Action Directive (PAD) 14-04, Implementation of the Air Force Installation and

  9. Energetic plan of the Putumayo

    International Nuclear Information System (INIS)

    Mundo electrico colombiano

    2001-01-01

    The plan to energize contemplates the arrival from the permanent service of energy to all the municipalities from the high Putumayo until the frontier with the Ecuador and it also registers planning actions and execution of a project of generation taking advantage of the local alternative energy for the Municipality of Port Leguizamo

  10. MARBLE: A system for executing expert systems in parallel

    Science.gov (United States)

    Myers, Leonard; Johnson, Coe; Johnson, Dean

    1990-01-01

    This paper details the MARBLE 2.0 system which provides a parallel environment for cooperating expert systems. The work has been done in conjunction with the development of an intelligent computer-aided design system, ICADS, by the CAD Research Unit of the Design Institute at California Polytechnic State University. MARBLE (Multiple Accessed Rete Blackboard Linked Experts) is a system of C Language Production Systems (CLIPS) expert system tool. A copied blackboard is used for communication between the shells to establish an architecture which supports cooperating expert systems that execute in parallel. The design of MARBLE is simple, but it provides support for a rich variety of configurations, while making it relatively easy to demonstrate the correctness of its parallel execution features. In its most elementary configuration, individual CLIPS expert systems execute on their own processors and communicate with each other through a modified blackboard. Control of the system as a whole, and specifically of writing to the blackboard is provided by one of the CLIPS expert systems, an expert control system.

  11. Remediation planning and risk assessment support through data fusion technology

    International Nuclear Information System (INIS)

    1996-01-01

    Coleman Research's Data Fusion Modeling (DFM) services gives one the ability to use large geophysical and hydrological data sets, which include direct and indirect measurements, to obtain a unified mathematical model of the geology and hydrology at one's site. Coleman Research (CRC) has adapted highly stable and efficient statistical inversion techniques, developed over the past 20 years, to provide a 3D site model with quantified uncertainty based on state-of-the-art modeling codes. This site model supports risk assessment and remediation planning with enhanced numerical accuracy for tradeoff studies of alternate remediation strategies. Further, DFM supports real time model updates during remediation and site investigation

  12. Environmental Monitoring Plan, Nevada Test Site and support facilities

    International Nuclear Information System (INIS)

    1991-11-01

    This Operational Area Monitoring Plan for environmental monitoring, is for EG ampersand G Energy Measurements, Inc. (EG ampersand G/EM) which operates several offsite facilities in support of activities at the Nevada Test Site (NTS). These facilities include: (1) Amador Valley Operations (AVO), Pleasanton, California; (2) Kirtland Operations (KO), Kirtland Air Force base, Albuquerque, New Mexico (KAFB); (3) Las Vegas Area Operations (LVAO), Remote Sensing Laboratory (RSL), and North Las Vegas (NLV) Complex at Nellis Air Force Base (NAFB), North Las Vegas, Nevada; (4) Los Alamos Operations (LAO), Los Alamos, New Mexico; (5) Santa Barbara Operations (SBO), Goleta, California; (6) Special Technologies Laboratory (STL), Santa Barbara, California; (7) Washington Aerial Measurements Department (WAMD), Andrews Air Force Base, Maryland; and, (8) Woburn Cathode Ray Tube Operations (WCO), Woburn, Massachusetts. Each of these facilities has an individual Operational Area Monitoring Plan, but they have been consolidated herein to reduce redundancy

  13. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  14. Project Plan For Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove SNM Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617. This project plan is the top-level definitive project management document for the PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baseline to manage the execution of the Remove SNM Materials project. Any deviation to the document must be authorized through the appropriate change control process. The Remove SNM Materials project provides the necessary support and controls required for DOE-HQ, DOE-RL, BWHC, and other DOE Complex Contractors the path forward to negotiate shipped/receiver agreements, schedule shipments, and transfer material out of PFP to enable final deactivation

  15. Executive Functions and Social Skills in Survivors of Pediatric Brain Tumor

    Science.gov (United States)

    Wolfe, Kelly R.; Walsh, Karin S.; Reynolds, Nina C.; Mitchell, Frances; Reddy, Alyssa T.; Paltin, Iris; Madan-Swain, Avi

    2012-01-01

    Medical advances have resulted in increased survival rates for children with brain tumors. Consequently, issues related to survivorship have become more critical. The use of multimodal treatment, in particular cranial radiation therapy, has been associated with subsequent cognitive decline. Specifically, deficits in executive functions have been reported in survivors of various types of pediatric brain tumor. Survivors are left with difficulties, particularly in self-monitoring, initiation, inhibition, and planning, to name a few. Another domain in which survivors of pediatric brain tumor have been reported to show difficulty is that of social skills. Parents, teachers, and survivors themselves have reported decreased social functioning following treatment. Deficits in executive functions and social skills are likely interrelated in this population, as executive skills are needed to navigate various aspects of social interaction; however, this has yet to be studied empirically. Twenty-four survivors of pediatric brain tumor were assessed using a computerized task of executive functions, as well as paper and pencil measures of social skills and real world executive skills. Social functioning was related to a specific aspect of executive functions, i.e., the survivors’ variability in response time, such that inconsistent responding was associated with better parent-report and survivor-report social skills, independent of intellectual abilities. Additionally, parent-reported real-world global executive abilities predicted parent-reported social skills. The implications of these findings for social skills interventions and future research are discussed. PMID:22420326

  16. 94-1 Research and Development Project Lead laboratory support. Status report, October 1--December 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Dinehart, M. [comp.

    1996-05-01

    This is a quarterly progress report of the 94-1 Research and Development Lead Laboratory Support Technical Program Plan for the first quarter of FY 1996. The report provides details concerning descriptions, DOE-complex-wide material stabilization technology needs, scientific background and approach, progress, benefits to the DOE complex, and collaborations for selected subprojects. An executive summary and report on end-of-quarter spending is included.

  17. 94-1 Research and Development Project Lead laboratory support. Status report, October 1--December 31, 1995

    International Nuclear Information System (INIS)

    Dinehart, M.

    1996-05-01

    This is a quarterly progress report of the 94-1 Research and Development Lead Laboratory Support Technical Program Plan for the first quarter of FY 1996. The report provides details concerning descriptions, DOE-complex-wide material stabilization technology needs, scientific background and approach, progress, benefits to the DOE complex, and collaborations for selected subprojects. An executive summary and report on end-of-quarter spending is included

  18. Tutoring executives online

    DEFF Research Database (Denmark)

    Bignoux, Stephane; Sund, Kristian J.

    2018-01-01

    Studies of learning and student satisfaction in the context of online university programmes have largely neglected programmes catering specifically to business executives. Such executives have typically been away from higher education for a number of years, and have collected substantial practical...... experience in the subject matters they are taught. Their expectations in terms of both content and delivery may therefore be different from non-executive students. We explore perceptions of the quality of tutoring in the context of an online executive MBA programme through participant interviews. We find...... that in addition to some of the tutor behaviours already discussed in the literature, executive students look specifically for practical industry knowledge and experience in tutors, when judging how effective a tutor is. This has implications for both the recruitment and training of online executive MBA tutors....

  19. Tutoring Executives Online

    DEFF Research Database (Denmark)

    Bignoux, Stephane; Sund, Kristian J.

    2016-01-01

    Studies of learning and student satisfaction in the context of online university programs have largely neglected programs catering specifically to business executives. Such executives have typically been away from higher education for a number of years, and have collected substantial practical...... experience in the subject matters they are taught. Their expectations in terms of both content and delivery may therefore be different from non-executive students. We explore perceptions of the quality of tutoring in the context of an online executive MBA program through participant interviews. We find...... that in addition to some of the tutor behaviors already discussed in the literature, executive students look specifically for practical industry knowledge and experience in tutors, when judging how effective a tutor is. This has implications for both the recruitment and training of online executive MBA tutors....

  20. The relationship of theory of mind and executive functions in normal, deaf and cochlear-implanted children

    Directory of Open Access Journals (Sweden)

    Farideh Nazarzadeh

    2014-08-01

    Full Text Available Background and Aim : Theory of mind refers to the ability to understand the others have mental states that can be different from one's own mental states or facts. This study aimed to investigate the relationship of theory of mind and executive functions in normal hearing, deaf, and cochlear-implanted children.Methods: The study population consisted of normal, deaf and cochlear-implanted girl students in Mashhad city, Iran. Using random sampling, 30 children (10 normal, 10 deaf and 10 cochlear-implanted in age groups of 8-12 years old were selected. To measure the theoty of mind, theory of mind 38-item scale and to assess executive function, Coolidge neuropsychological and personality test was used. Research data were analyzed using the Spearman correlation coefficient, analysis of variance and Kruskal-Wallis tests.Results: There was a significant difference between the groups in the theory of mind and executive function subscales, organization, planning-decision-making, and inhibition. Between normal and deaf groups (p=0.01, as well as cochlear-implanted and deaf groups (p=0.01, there was significant difference in planning decision-making subscale. There was not any significant relationship between the theory of mind and executive functions generally or the theory of mind and executive function subscales in these three groups independently.Conclusion: Based on our findings, cochlear-implanted and deaf children have lower performance in theory of mind and executive function compared with normal hearing children.

  1. Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) program plan: Executive summary

    International Nuclear Information System (INIS)

    McGinnis, C.P.; Eisenhower, B.M.; Reeves, M.E.; DePaoli, S.M.; Stinton, L.H.; Harrington, E.H.

    1989-02-01

    The Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) Program Plan provides a strategy for management of hazardous and mixed wastes generated by the five Department of Energy (DOE) installations managed by Martin Marietta Energy Systems, Inc. (Energy Systems). This integrated corporate plan is based on the individual installation plans, which identify waste streams, facility capabilities, problem wastes, future needs, and funding needs. Using this information, the corporate plan identifies common concerns and technology/facility needs over the next 10 years. The overall objective of this corporate plan is to ensure that treatment, storage, and disposal (TSD) needs for all hazardous and mixed wastes generated by Energy Systems installations have been identified and planned for. Specific objectives of the program plan are to (1) identify all hazardous and mixed waste streams; (2) identify hazardous and mixed waste TSD requirements; (3) identify any unresolved technical issues preventing implementation of the strategy; (4) develop schedules for studies, demonstrations, and facilities to resolve the issues; and (5) define the interfaces with the Low-Level Waste Disposal Development and Demonstration (LLWDDD) Program. 10 refs., 7 figs

  2. An innovative approach for planning and execution of pre-experimental runs for Design of Experiments

    Directory of Open Access Journals (Sweden)

    Muhammad Arsalan Farooq

    2016-09-01

    Full Text Available This paper addresses the study of the pre-experimental planning phase of the Design of Experiments (DoE in order to improve the final product quality. The pre-experimental planning phase includes a clear identification of the problem statement, selection of control factors and their respective levels and ranges. To improve production quality based on the DoE a new approach for the pre-experimental planning phase, called Non-Conformity Matrix (NCM, is presented. This article also addresses the key steps of the pre-experimental runs considering a consumer goods manufacturing process. Results of the application for an industrial case show that this methodology can support a clear definition of the problem and also a correct identification of the factor ranges in particular situations. The proposed new approach allows modeling the entire manufacturing system holistically and correctly defining the factor ranges and respective levels for a more effective application of DoE. This new approach can be a useful resource for both research and industrial practitioners who are dedicated to large DoE projects with unknown factor interactions, when the operational levels and ranges are not completely defined.

  3. Hospital executive compensation act dropped from ballot

    Directory of Open Access Journals (Sweden)

    Robbins RA

    2016-08-01

    Full Text Available The Hospital Executive Compensation Act did not qualify for the November 8, 2016 ballot in Arizona as a state statute (1. The Service Employees International Union (SEIU dropped the initiative just before arguments were to begin in a lawsuit that challenged the legality of signature gatherers who failed to register with the state. The measure would have limited total pay for executives, administrators and managers of healthcare facilities and entities to the annual salary of the President of the United States. A similar measure in California was also dropped by the SEIU in 2014. Supporters of the proposal said it would decrease escalating healthcare costs. Opponents of the measure, including the Arizona Chamber of Commerce who filed the suit challenging the proposition, alleged that it would lead to poorer healthcare. However, a survey conducted by the Southwest Journal of Pulmonary and Critical Care showed that most supported the measure and felt that it would not lead to poorer healthcare (2.

  4. Semantic Interoperability in Distributed Planning

    National Research Council Canada - National Science Library

    Staskevich, Gennady R; Hudack, Jeffrey W; Lawton, James; Carozzoni, Joseph A

    2008-01-01

    .... A key challenge for this transformation to Globally-Linked Air and Space Operations Centers is developing the ability to collaboratively plan and execute operations with multiple cooperating command centers...

  5. 20 strategies for marketing your managed care plan.

    Science.gov (United States)

    Firshein, J

    1996-01-01

    In today's fiercely competitive managed care marketplace, healthcare executives must find a way to set their plans apart from the competition and build a sufficient customer base. At the same time, they must confront a growing anti-managed care backlash among a wary and confused public. Healthcare executive magazine talked with managed care experts to gather their views on key strategies to help executives meet both of these challenges. Here's what they suggest.

  6. National climate change action plans: Interim report for developing and transition countries

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, R.; Ness, E.; Hirst, J. [eds.

    1997-10-01

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

  7. Richland Operations (DOE-RL) Environmental Safety Health (ES and H) FY 2000 and FY 2001 Execution Commitment Summary

    Energy Technology Data Exchange (ETDEWEB)

    REEP, I.E.

    2000-12-01

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the Safety and Health (S&H) resources that support these activities. The fiscal year (FY) 2000 and 2001 information and data contained in the Richland Operations Environment, Safefy and Health Fiscal Year 2002 Budget-Risk Management Summary (RL 2000a) were the basis for preparing this report. Fiscal year 2001 activities are based on the President's Amended Congressional Budget Request of $689.6 million for funding Ofice of Environmental Management (EM) $44.0 million for Fast Flux Test Facility standby less $7.0 million in anticipated DOE, Headquarters holdbacks for Office of Nuclear Energy, Science and Technology (NE); and $55.3 million for Safeguards and Security (SAS). Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2003 ES&H Budget-Risk Management Summary to be issued in May 2001. This report provides the end-of-year status of FY 2000 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2001 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H guidance contained in the FY 2002 Field Budget Call (DOE 2000).

  8. Executive functioning in chronic alcoholism and Korsakoff syndrome.

    Science.gov (United States)

    Maharasingam, Malini; Macniven, Jamie A B; Mason, Oliver J

    2013-01-01

    Korsakoff syndrome (KS) is characterized by dense anterograde and retrograde amnesia. There is often a temporal gradient to the retrograde amnesia, with earlier memories more readily recalled than recent memories. Executive functioning has also been found to be impaired in KS. However, research comparing executive functioning between chronic alcoholics (AL) and patients with KS has been relatively sparse to date. In a group comparison design, executive functioning in 15 KS patients and 16 chronic alcoholic patients was assessed using the Behavioural Assessment of the Dysexecutive Syndrome test (BADS) and other secondary measures. The KS group was found to be significantly more impaired than the AL group on overall performance on the BADS (p Korsakoff patients are significantly more impaired in executive functioning than non-Korsakoff chronic alcoholics. We thank the participants of the study and also acknowledge the support of the University of Nottingham, particularly Nadina Lincoln, and the North East London NHS Foundation Trust. We are also very grateful to the anonymous reviewers of earlier drafts of this manuscript for their invaluable comments.

  9. Changing the Project Execution Culture at NASA Dryden

    Science.gov (United States)

    Horn, Thomas J.

    2012-01-01

    Dryden has embarked on implementing Critical Chain Project Management (CCPM) philosophies and tools to reduce workforce stress and increase the centers work throughput. This effort has been under way for over one year and represents a fundamental state change in how various projects are planned and executed at the center. The implementation of CCPM philosophies and the required cultural changes represent the most difficult aspects of the implementation.

  10. Illinois statewide gas utility plan, 1993-2002. Volume 1. Executive summary

    International Nuclear Information System (INIS)

    1992-12-01

    The second Illinois Statewide Natural Gas Utility Plan is a continuation of the Least-Cost Planning effort introduced by the Public Utilities Act of 1986. The purpose of the Plan, like its predecessor, is to provide a framework and a set of policies which will allow and encourage local distribution companies to develop least-cost plans consistent with the goals of the Act: to provide efficient, environmentally sound, reliable, and equitable public utility service at the least possible cost. The Plan assesses natural gas demand and supply under five scenarios for the period 1993-2002. Key issues related to the development of least-cost natural gas plans are identified, and policies for addressing the issues are developed. The rationale and potential for natural gas demand side management (DSM) programs and policies are explored, and recommendations made with respect to utility DSM capability-building and DSM cost-recovery

  11. Executive functions in becoming writing readers and reading writers: note taking and report writing in third and fifth graders.

    Science.gov (United States)

    Altemeier, Leah; Jones, Janine; Abbott, Robert D; Berninger, Virginia W

    2006-01-01

    Results are reported for a study of 2 separate processes of report writing-taking notes while reading source material and composing a report from those notes-and related individual differences in executive functions involved in integrating reading and writing during these writing activities. Third graders (n = 122) and 5th graders (n = 106; overall, 127 girls and 114 boys) completed two reading-writing tasks-read paragraph (mock science text)-write notes and use notes to generate written report, a reading comprehension test, a written expression test, four tests of executive functions (inhibition, verbal fluency, planning, switching attention), and a working memory test. For the read-take notes task, the same combination of variables was best (explained the most variance and each variable added unique variance) for 3rd graders and 5th graders: Wechsler Individual Achievement Test-Second Edition (WIAT-II) Reading Comprehension, Process Assessment of the Learner Test for Reading and Writing (PAL) Copy Task B, WIAT-II Written Expression, and Delis-Kaplan Executive Function System (D-KEFS) Inhibition. For the use notes to write report task, the best combinations of variables depended on grade level: For 3rd graders, WIAT-II Reading Comprehension, WIAT-II Written Expression, D-KEFS Verbal Fluency, and Tower of Hanoi; for 5th graders, WIAT-II Reading Comprehension, D-KEFS Verbal Fluency, WIAT-II Written Expression, and PAL Alphabet Task. These results add to prior research findings that executive functions contribute to the writing development of elementary-grade students and additionally support the hypothesis that executive functions play a role in developing reading-writing connections.

  12. The Other Side of the Tradeoff: The Impact of Risk on Executive Compensation

    OpenAIRE

    Rajesh Aggarwal; Andrew A. Samwick

    1998-01-01

    The principal-agent model of executive compensation is of central importance to the modern theory of the firm and corporate governance, yet the existing empirical evidence supporting it is quite weak. The key predication of the model is that the executive's pay-performance sensitivity is decreasing in the variance of the firm's performance. We demonstrate strong empirical confirmation of this prediction using a comprehensive sample of executives at large corporations. In general, the pay-perf...

  13. Program support of the automated system of planned calculations of the Oil and Gas Extracting Administration

    Energy Technology Data Exchange (ETDEWEB)

    Ashkinuze, V G; Reznikovskiy, P T

    1978-01-01

    An examination is made of the program support of the Automated System of Planned Calculations (ASPC) of the oil and Gas Extracting Administration (OGEA). Specific requirements for the ASPC of the OGEA are indicated and features of its program realization. In developing the program support of the system, an approach of parametric programming was used. A formal model of the ASPC OGEA is described in detail. It was formed in a theoretical-multiple language. Sets with structure of a tree are examined. They illustrate the production and administrative hierarchical structure of the planning objects in the oil region. The top of the tree corresponds to the OGEA as a whole. In the simplest realization, the tree has two levels of hierarchy: association and field. In general features, a procedure is described for possible use of the system by the planning workers. A plan is presented for program support of the ASPC OGEA, in light of whose specific nature a large part of the programs which realize this system are written in a language ASSEMBLER.

  14. South Dakota ITS/CVO business plan : executive summary

    Science.gov (United States)

    1998-01-19

    This report defines an ITS/CVO program for the State of South Dakota. It is a Business Plan to guide the deployment of Intelligent Transportation Systems (ITS) technology for improving commercial vehicle operations (CVO) in South Dakota. This ITS/CVO...

  15. Planner concepts in IMRT planning

    International Nuclear Information System (INIS)

    Sahoo, Suvendu Kr.; Rath, A.K.; Patnaik, S.; Mishra, S.K.

    2008-01-01

    IMRT is the most sophisticated, innovative, three- dimensional conformal radiation treatment that delivers highly focused radiation with minimal impact to surrounding normal tissue. As it is a computer control technique, the planar should have adequate knowledge to execute the plan in proper way other wise it is very difficult to get the optimal plan. In this article we want to high light, planner should have the basic concepts before starting the IMRT planning

  16. Motor planning flexibly optimizes performance under uncertainty about task goals.

    Science.gov (United States)

    Wong, Aaron L; Haith, Adrian M

    2017-03-03

    In an environment full of potential goals, how does the brain determine which movement to execute? Existing theories posit that the motor system prepares for all potential goals by generating several motor plans in parallel. One major line of evidence for such theories is that presenting two competing goals often results in a movement intermediate between them. These intermediate movements are thought to reflect an unintentional averaging of the competing plans. However, normative theories suggest instead that intermediate movements might actually be deliberate, generated because they improve task performance over a random guessing strategy. To test this hypothesis, we vary the benefit of making an intermediate movement by changing movement speed. We find that participants generate intermediate movements only at (slower) speeds where they measurably improve performance. Our findings support the normative view that the motor system selects only a single, flexible motor plan, optimized for uncertain goals.

  17. Executive Leadership in School Improvement Networks: A Conceptual Framework and Agenda for Research

    Science.gov (United States)

    Peurach, Donald J.; Gumus, Emine

    2011-01-01

    The purpose of this analysis is to improve understanding of executive leadership in school improvement networks: for example, networks supported by comprehensive school reform providers, charter management organizations, and education management organizations. In this analysis, we review the literature on networks and executive leadership. We draw…

  18. A better-response strategy for self-interested planning agents

    NARCIS (Netherlands)

    Jordan Prunera, J.M.; Torreño, Alejandro; de Weerdt, M.M.; Onaindia, Eva

    2018-01-01

    When self-interested agents plan individually, interactions that prevent them from executing their actions as planned may arise. In these coordination problems, game-theoretic planning can be used to enhance the agents’ strategic behavior considering the interactions as part of the agents’

  19. Notification: Implementation of Executive Order 13771, “Reducing Regulation and Controlling Regulatory Costs”

    Science.gov (United States)

    Project #OA&E-FY18-0177, April 10, 2018. The OIG plans to begin preliminary research on the Office of the Administrator's Office of Policy implementation of Executive Order 13771, Reducing Regulation and Controlling Regulatory Costs.

  20. Integrated High-Level Waste System Planning - Utilizing an Integrated Systems Planning Approach to Ensure End-State Definitions are Met and Executed - 13244

    Energy Technology Data Exchange (ETDEWEB)

    Ling, Lawrence T. [URS-Savannah River Remediation, Savannah River Site, Building 766-H Room 2205, Aiken, SC 29808 (United States); Chew, David P. [URS-Savannah River Remediation, Savannah River Site, Building 766-H Room 2426, Aiken, SC 29808 (United States)

    2013-07-01

    The Savannah River Site (SRS) is a Department of Energy site which has produced nuclear materials for national defense, research, space, and medical programs since the 1950's. As a by-product of this activity, approximately 37 million gallons of high-level liquid waste containing approximately 292 million curies of radioactivity is stored on an interim basis in 45 underground storage tanks. Originally, 51 tanks were constructed and utilized to support the mission. Four tanks have been closed and taken out of service and two are currently undergoing the closure process. The Liquid Waste System is a highly integrated operation involving safely storing liquid waste in underground storage tanks; removing, treating, and dispositioning the low-level waste fraction in grout; vitrifying the higher activity waste at the Defense Waste Processing Facility; and storing the vitrified waste in stainless steel canisters until permanent disposition. After waste removal and processing, the storage and processing facilities are decontaminated and closed. A Liquid Waste System Plan (hereinafter referred to as the Plan) was developed to integrate and document the activities required to disposition legacy and future High-Level Waste and to remove from service radioactive liquid waste tanks and facilities. It establishes and records a planning basis for waste processing in the liquid waste system through the end of the program mission. The integrated Plan which recognizes the challenges of constrained funding provides a path forward to complete the liquid waste mission within all regulatory and legal requirements. The overarching objective of the Plan is to meet all Federal Facility Agreement and Site Treatment Plan regulatory commitments on or ahead of schedule while preserving as much life cycle acceleration as possible through incorporation of numerous cost savings initiatives, elimination of non-essential scope, and deferral of other scope not on the critical path to compliance

  1. Integrated High-Level Waste System Planning - Utilizing an Integrated Systems Planning Approach to Ensure End-State Definitions are Met and Executed - 13244

    International Nuclear Information System (INIS)

    Ling, Lawrence T.; Chew, David P.

    2013-01-01

    The Savannah River Site (SRS) is a Department of Energy site which has produced nuclear materials for national defense, research, space, and medical programs since the 1950's. As a by-product of this activity, approximately 37 million gallons of high-level liquid waste containing approximately 292 million curies of radioactivity is stored on an interim basis in 45 underground storage tanks. Originally, 51 tanks were constructed and utilized to support the mission. Four tanks have been closed and taken out of service and two are currently undergoing the closure process. The Liquid Waste System is a highly integrated operation involving safely storing liquid waste in underground storage tanks; removing, treating, and dispositioning the low-level waste fraction in grout; vitrifying the higher activity waste at the Defense Waste Processing Facility; and storing the vitrified waste in stainless steel canisters until permanent disposition. After waste removal and processing, the storage and processing facilities are decontaminated and closed. A Liquid Waste System Plan (hereinafter referred to as the Plan) was developed to integrate and document the activities required to disposition legacy and future High-Level Waste and to remove from service radioactive liquid waste tanks and facilities. It establishes and records a planning basis for waste processing in the liquid waste system through the end of the program mission. The integrated Plan which recognizes the challenges of constrained funding provides a path forward to complete the liquid waste mission within all regulatory and legal requirements. The overarching objective of the Plan is to meet all Federal Facility Agreement and Site Treatment Plan regulatory commitments on or ahead of schedule while preserving as much life cycle acceleration as possible through incorporation of numerous cost savings initiatives, elimination of non-essential scope, and deferral of other scope not on the critical path to compliance

  2. Positive behavioral support planning in the inpatient treatment of severe disruptive behaviors: A description of service features.

    Science.gov (United States)

    Hamlett, Nakia M; Carr, Erika R; Hillbrand, Marc

    2016-05-01

    Positive behavior support (PBS) plans are increasingly used on inpatient units to assess and treat serious and dangerous behaviors displayed by patients with serious psychiatric impairment. A contemporary extension of traditional applied behavior analytic procedures, PBS plans integrate theories from several domains with perspectives on community psychology, positive psychology, and recovery-oriented care. Because there is little evidence to suggest that more invasive, punitive disciplinary strategies lead to long-term positive behavioral change (Parkes, 1996), PBS plans have emerged as an alternative to the use of seclusion and restraint or other forms of restrictive measures typically used on inpatient psychiatric units (Hammer et al., 2011). Moreover, PBS plans are a preferred method of intervention because more invasive interventions often cause more harm than good to all involved (Elliott et al., 2005). This article seeks to provide an integrated framework for the development of positive behavior support plans in inpatient psychiatric settings. In addition to explicating the philosophy and core elements of PBS plans, this work includes discussion of the didactic and pragmatic aspects of training clinical staff in inpatient mental health settings. A case vignette is included for illustration and to highlight the use of PBS plans as a mechanism for helping patients transition to less restrictive settings. This work will add to the scant literature examining the use of positive behavioral support plans in inpatient psychiatric settings. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  3. Self-Report Assessment of Executive Functioning in College Students with Disabilities

    Science.gov (United States)

    Grieve, Adam; Webne-Behrman, Lisa; Couillou, Ryan; Sieben-Schneider, Jill

    2014-01-01

    This study presents a unique assessment of executive functioning (EF) among postsecondary students with disabilities, with the aim of understanding the extent to which students with different disabilities and in different age groups assess their own difficulties with relevant and educationally-adaptive skills such as planning, initiating, managing…

  4. HAUTO: Automated composition of convergent services based in HTN planning

    Directory of Open Access Journals (Sweden)

    Armando Ordoñez

    2014-01-01

    Full Text Available This paper presents HAUTO, a framework able to compose convergent services automatically. HAUTO is based in HTN (hierarchical task networks Automated Planning and is composed of three modules: a request processing module that transforms natural language and context information into a planning instance, the automated composition module based on HTN planning and the execution environment for convergent (Web and telecom services. The integration of a planning component provides two basic functionalities: the possibility of customizing the composition of services using the user context information and a middleware level that integrates the execution of services in high performance telecom environments. Finally, a prototype in environmental early warning management is presented as a test case.

  5. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  6. Executive functions as predictors of visual-motor integration in children with intellectual disability.

    Science.gov (United States)

    Memisevic, Haris; Sinanovic, Osman

    2013-12-01

    The goal of this study was to assess the relationship between visual-motor integration and executive functions, and in particular, the extent to which executive functions can predict visual-motor integration skills in children with intellectual disability. The sample consisted of 90 children (54 boys, 36 girls; M age = 11.3 yr., SD = 2.7, range 7-15) with intellectual disabilities of various etiologies. The measure of executive functions were 8 subscales of the Behavioral Rating Inventory of Executive Function (BRIEF) consisting of Inhibition, Shifting, Emotional Control, Initiating, Working memory, Planning, Organization of material, and Monitoring. Visual-motor integration was measured with the Acadia test of visual-motor integration (VMI). Regression analysis revealed that BRIEF subscales explained 38% of the variance in VMI scores. Of all the BRIEF subscales, only two were statistically significant predictors of visual-motor integration: Working memory and Monitoring. Possible implications of this finding are further elaborated.

  7. Single-Shell Tank (SST) Interim Stabilization Project Plan

    International Nuclear Information System (INIS)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-01-01

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline

  8. Experience with Remote Job Execution

    International Nuclear Information System (INIS)

    Lynch, Vickie E.; Cobb, John W; Green, Mark L.; Kohl, James Arthur; Miller, Stephen D.; Ren, Shelly; Smith, Bradford C.; Vazhkudai, Sudharshan S.

    2008-01-01

    The Neutron Science Portal at Oak Ridge National Laboratory submits jobs to the TeraGrid for remote job execution. The TeraGrid is a network of high performance computers supported by the US National Science Foundation. There are eleven partner facilities with over a petaflop of peak computing performance and sixty petabytes of long-term storage. Globus is installed on a local machine and used for job submission. The graphical user interface is produced by java coding that reads an XML file. After submission, the status of the job is displayed in a Job Information Service window which queries globus for the status. The output folder produced in the scratch directory of the TeraGrid machine is returned to the portal with globus-url-copy command that uses the gridftp servers on the TeraGrid machines. This folder is copied from the stage-in directory of the community account to the user's results directory where the output can be plotted using the portal's visualization services. The primary problem with remote job execution is diagnosing execution problems. We have daily tests of submitting multiple remote jobs from the portal. When these jobs fail on a computer, it is difficult to diagnose the problem from the globus output. Successes and problems will be presented

  9. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan; FINAL

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  10. Assessing executive functions in preschoolers using Shape School Task

    Directory of Open Access Journals (Sweden)

    Marta Nieto

    2016-09-01

    Full Text Available Over the last two decades, there has been a growing interest in the study of the development of executive functions in preschool children due to their relationship with different cognitive, psychological, social and academic domains. Early detection of individual differences in executive functioning can have major implications for basic and applied research. Consequently, there is a key need for assessment tools adapted to preschool skills: Shape School has been shown to be a suitable task for this purpose. Our study uses Shape School as the main task to analyze development of inhibition, task-switching and working memory in a sample of 304 preschoolers (age range 3.25-6.50 years. Additionally, we include cognitive tasks for the evaluation of verbal variables (vocabulary, word reasoning and short-term memory and performance variables (picture completion and symbol search, so as to analyze their relationship with executive functions. Our results show age-associated improvements in executive functions and the cognitive variables assessed. Furthermore, correlation analyses reveal positive relationships between executive functions and the other cognitive variables. More specifically, using structural equation modeling and including age direct and indirect effects, our results suggest that executive functions explain to a greater extent performance on verbal and performance tasks. These findings provide further information to support research that considers preschool age to be a crucial period for the development of executive functions and their relationship with other cognitive processes

  11. Engineering Task Plan for Water Supply for Spray Washers on the Support Trucks

    International Nuclear Information System (INIS)

    BOGER, R.M.

    2000-01-01

    This Engineering Task Plan (ETP) defines the task and deliverables associated with the design, fabrication and testing of an improved spray wash system for the Rotary Mode Core Sampling (RMCS) System Support Trucks

  12. A decision support system for pre-earthquake planning of lifeline networks

    Energy Technology Data Exchange (ETDEWEB)

    Liang, J.W. [Tianjin Univ. (China). Dept. of Civil Engineering

    1996-12-01

    This paper describes the frame of a decision support system for pre-earthquake planning of gas and water networks. The system is mainly based on the earthquake experiences and lessons from the 1976 Tangshan earthquake. The objective of the system is to offer countermeasures and help make decisions for seismic strengthening, remaking, and upgrading of gas and water networks.

  13. Contribution of execution noise to arm movement variability in three-dimensional space.

    Science.gov (United States)

    Apker, Gregory A; Buneo, Christopher A

    2012-01-01

    Reaching movements are subject to noise associated with planning and execution, but precisely how these noise sources interact to determine patterns of endpoint variability in three-dimensional space is not well understood. For frontal plane movements, variability is largest along the depth axis (the axis along which visual planning noise is greatest), with execution noise contributing to this variability along the movement direction. Here we tested whether these noise sources interact in a similar way for movements directed in depth. Subjects performed sequences of two movements from a single starting position to targets that were either both contained within a frontal plane ("frontal sequences") or where the first was within the frontal plane and the second was directed in depth ("depth sequences"). For both sequence types, movements were performed with or without visual feedback of the hand. When visual feedback was available, endpoint distributions for frontal and depth sequences were generally anisotropic, with the principal axes of variability being strongly aligned with the depth axis. Without visual feedback, endpoint distributions for frontal sequences were relatively isotropic and movement direction dependent, while those for depth sequences were similar to those with visual feedback. Overall, the results suggest that in the presence of visual feedback, endpoint variability is dominated by uncertainty associated with planning and updating visually guided movements. In addition, the results suggest that without visual feedback, increased uncertainty in hand position estimation effectively unmasks the effect of execution-related noise, resulting in patterns of endpoint variability that are highly movement direction dependent.

  14. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  15. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  16. Planning of activities in the Laguna Verde Central planning at 12 weeks; Planeacion de Actividades en la Central Laguna Verde planeacion a doce semanas

    Energy Technology Data Exchange (ETDEWEB)

    Chimalpopoca, C. [Comision Federal de Electricidad, Central Laguna Verde, Subgerencia General de Operacion y Planeacion, Veracruz (Mexico)]. e-mail: carlos.chimalpopoca@cfe.gob.mx

    2007-07-01

    The universe of works that are carried out in a nuclear facility to maintain effective the structures, systems and components require of a continuous analysis, in the order of the maintenance frequencies that can be of the preventive, predictive or corrective type. Each component is associated to reserve parts, readiness of systems, in fulfillment to the operation technical specifications, to the environment of the one work; each component requires of a planning level, where it is distinguished with clarity when they are executed, in the operation stage, stop or recharge. This work has as end to show like the activities are planned during the operation, using planning methods to twelve weeks, where the reach of the task is conceptualized, operative requirements, of reserve parts, of the work environment analysis, of those radiological conditions, of the authorizations for their execution, the same execution and the evaluation post work like a technique to maintain in continuous improvement the tasks of the maintenance of the Units of the Power station. A motor valve to be worked in its internals requires access to the work point, it requires bill of the system, electric disconnection, maneuvers to disassemble actuators and retirement of thermal isolation if it applies, reserve parts of the caps joints, control mechanisms, personal, tools, radiological control. The success of the continuous operation of a power station is in the planning quality, the attention of each one of the details to assure that the components, structures and components stay effective to make their function when they are demanded. The planning task requires of experience and knowledge of each some of the components, the task of planning of activities and its execution is multidisciplinary This work has that purpose, to show the planning tools in the Laguna Verde Nuclear Power station, under the concept of twelve weeks. (Author)

  17. Speech-language pathology telehealth in rural and remote schools: the experience of school executive and therapy assistants.

    Science.gov (United States)

    Fairweather, Glenn C; Lincoln, Michelle A; Ramsden, Robyn

    2017-01-01

    Difficulties in accessing allied health services, especially in rural and remote areas, appear to be driving the use of telehealth services to children in schools. The objectives of this study were to investigate the experiences and views of school executive staff and therapy assistants regarding the feasibility and acceptability of a speech-language pathology telehealth program for children attending schools in rural and remote New South Wales, Australia. The program, called Come N See, provided therapy interventions remotely via low-bandwidth videoconferencing, with email follow-up. Over a 12-week period, children were offered therapy blocks of six fortnightly sessions, each lasting a maximum of 30 minutes. School executives (n=5) and therapy assistants (n=6) described factors that promoted or threatened the program's feasibility and acceptability, during semistructured interviews. Thematic content analysis with constant comparison was applied to the transcribed interviews to identify relationships in the data. Emergent themes related to (a) unmet speech pathology needs, (b) building relationships, (c) telehealth's advantages, (d) telehealth's disadvantages, (e) anxiety replaced by joy and confidence in growing skills, and (f) supports. School executive staff and therapy assistants verified that the delivery of the school-based telehealth service was feasible and acceptable. However, the participants saw significant opportunities to enhance this acceptability through building into the program stronger working relationships and supports for stakeholders. These findings are important for the future development of allied health telehealth programs that are sustainable as well as effective and fit the needs of all crucial stakeholders. The results have significant implications for speech pathology clinical practice relating to technology, program planning and teamwork within telehealth programs.

  18. The contribution of executive control to semantic cognition: Convergent evidence from semantic aphasia and executive dysfunction

    OpenAIRE

    Thompson, Hannah; Almaghyuli, Azizah; Noonan, Krist A.; barak, Ohr; Lambon Ralph, Matthew A.; Jefferies, Elizabeth

    2018-01-01

    Semantic cognition, as described by the controlled semantic cognition (CSC) framework (Rogers et al., 2015, Neuropsychologia, 76, 220), involves two key components: activation of coherent, generalizable concepts within a heteromodal ‘hub’ in combination with modality-specific features (spokes), and a constraining mechanism that manipulates and gates this knowledge to generate time- and task-appropriate behaviour. Executive–semantic goal representations, largely supported by executive regions ...

  19. Final Report: Evaluation of Tools and Metrics to Support Employer Selection of Health Plans.

    Science.gov (United States)

    Mattke, Soeren; Van Busum, Kristin R; Martsolf, Grant R

    2014-01-01

    The Patient Protection and Affordable Care Act (ACA) places strong emphasis on quality of care as a means to improve outcomes for Americans and promote the financial sustainability of our health care system. Included in the ACA are new disclosure requirements that require health plans to provide a summary of benefits and coverage that accurately describes the benefits under the plan or coverage. These requirements are intended to support employers' procurement of high-value health coverage for their employees. This study attempts to help employers understand the structural differences between health plans and the performance dimensions along which plans can differ, as well as to educate employers about available tools that can be used to evaluate plan options. The study also discusses the extent to which these and other tools or resources are used by employers to inform choices between health plans.

  20. Ten-Year Network Development Plan - 2015 edition, executive summary

    International Nuclear Information System (INIS)

    2016-01-01

    Complying with the European and French laws, each year, RTE prepares and publicizes a Ten-Year Network Development Plan (NDP) to meet the expectations of its stakeholders and customers. The NDP lists the network development projects that RTE plans to complete and commission over a 3-year period and presents the main power transmission infrastructure work envisaged for the next Ten-years. Beyond, it outlines the possible network adaptation needs for a variety of energy transition scenarios. Over the next 10 years, the network investments will make it possible to: - Meet the goals of the Regional Climate Air Energy Plans, - Create 4 GW of extra offshore wind generation integration capacity and 10 GW of additional interconnection capacity, 2/3 more than the current capacity, - Enable the development of economically and demographically dynamic areas, with safe and high-standard electricity supply. In the coming decade, RTE plans: - 1,200 km of new underground and sub-sea DC links, along with their associated converter stations; - 600 km of existing equipment upgrades or new overhead 400 kV AC circuits substituting existing power lines. - and, at the same time, nearly 900 km of underground lines and just over 400 km of overhead 225 kV AC lines should be built. 400 projects are listed in this NDP: - 21% of the operations are on overhead lines (for 3/4 new lines or upgrade and for 1/4 dismantling of existing assets) - 27% concern new underground lines; - 52% on substation adaptations (about 20 new RTE substations and 100 new customer substations connected). Globally, nearly 80% of the network is developed underground or sub-sea. This edition of the Network Development plan is further enriched. In particular, it explains more thoroughly the link between the integration of renewable energy and the entailed development of the transmission network. It also provides a focus on smart grids. This edition relies on mid and long term scenarios describing the evolution of the

  1. Decision support for integrated water-energy planning.

    Energy Technology Data Exchange (ETDEWEB)

    Tidwell, Vincent Carroll; Malczynski, Leonard A.; Kobos, Peter Holmes; Castillo, Cesar; Hart, William Eugene; Klise, Geoffrey T.

    2009-10-01

    Currently, electrical power generation uses about 140 billion gallons of water per day accounting for over 39% of all freshwater withdrawals thus competing with irrigated agriculture as the leading user of water. Coupled to this water use is the required pumping, conveyance, treatment, storage and distribution of the water which requires on average 3% of all electric power generated. While water and energy use are tightly coupled, planning and management of these fundamental resources are rarely treated in an integrated fashion. Toward this need, a decision support framework has been developed that targets the shared needs of energy and water producers, resource managers, regulators, and decision makers at the federal, state and local levels. The framework integrates analysis and optimization capabilities to identify trade-offs, and 'best' alternatives among a broad list of energy/water options and objectives. The decision support framework is formulated in a modular architecture, facilitating tailored analyses over different geographical regions and scales (e.g., national, state, county, watershed, NERC region). An interactive interface allows direct control of the model and access to real-time results displayed as charts, graphs and maps. Ultimately, this open and interactive modeling framework provides a tool for evaluating competing policy and technical options relevant to the energy-water nexus.

  2. NRC drug-free workplace plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    On September 15, 1986, President Reagan signed Executive Order 12564, establishing the goal of a Drug-Free Federal Workplace. The Order made it a condition of employment that all Federal employees refrain from using illegal drugs on or off duty. On July 11, 1987, Congress passed legislation affecting implementation of the Executive Order under Section 503 of the Supplemental Appropriations Act of 1987, Public Law 100-71 (the Act). The Nuclear Regulatory Commission first issued the NRC Drug Testing Plan to set forth objectives, policies, procedures, and implementation guidelines to achieve a drug-free Federal workplace, consistent with the Executive Order and Section 503 of the Act. Revision 1, titled, ``NRC Drug-Free Workplace Plan,`` supersedes the previous version and its supplements and incorporates changes to reflect current guidance from the Department of Justice, the Department of Health and Human Services, as well as other guidance.

  3. NRC drug-free workplace plan. Revision 1

    International Nuclear Information System (INIS)

    1997-11-01

    On September 15, 1986, President Reagan signed Executive Order 12564, establishing the goal of a Drug-Free Federal Workplace. The Order made it a condition of employment that all Federal employees refrain from using illegal drugs on or off duty. On July 11, 1987, Congress passed legislation affecting implementation of the Executive Order under Section 503 of the Supplemental Appropriations Act of 1987, Public Law 100-71 (the Act). The Nuclear Regulatory Commission first issued the NRC Drug Testing Plan to set forth objectives, policies, procedures, and implementation guidelines to achieve a drug-free Federal workplace, consistent with the Executive Order and Section 503 of the Act. Revision 1, titled, ''NRC Drug-Free Workplace Plan,'' supersedes the previous version and its supplements and incorporates changes to reflect current guidance from the Department of Justice, the Department of Health and Human Services, as well as other guidance

  4. Age-Related Differences and Heterogeneity in Executive Functions: Analysis of NAB Executive Functions Module Scores.

    Science.gov (United States)

    Buczylowska, Dorota; Petermann, Franz

    2016-05-01

    Normative data from the German adaptation of the Neuropsychological Assessment Battery were used to examine age-related differences in 6 executive function tasks. A multivariate analysis of variance was employed to investigate the differences in performance in 484 participants aged 18-99 years. The coefficient of variation was calculated to compare the heterogeneity of scores between 10 age groups. Analyses showed an increase in the dispersion of scores with age, varying from 7% to 289%, in all subtests. Furthermore, age-dependent heterogeneity appeared to be associated with age-dependent decline because the subtests with the greatest increase in dispersion (i.e., Mazes, Planning, and Categories) also exhibited the greatest decrease in mean scores. In contrast, scores for the subtests Letter Fluency, Word Generation, and Judgment had the lowest increase in dispersion with the lowest decrease in mean scores. Consequently, the results presented here show a pattern of age-related differences in executive functioning that is consistent with the concept of crystallized and fluid intelligence. © The Author 2016. Published by Oxford University Press. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  5. Can scenario-planning support community-based natural resource management? Experiences from three countries in Latin America

    Directory of Open Access Journals (Sweden)

    Kerry A. Waylen

    2015-12-01

    Full Text Available Community-based natural resource management (CBNRM is a concept critical to managing social-ecological systems but whose implementation needs strengthening. Scenario planning is one approach that may offer benefits relevant to CBNRM but whose potential is not yet well understood. Therefore, we designed, trialed, and evaluated a scenario-planning method intended to support CBNRM in three cases, located in Colombia, Mexico, and Argentina. Implementing scenario planning was judged as worthwhile in all three cases, although aspects of it were challenging to facilitate. The benefits generated were relevant to strengthening CBNRM: encouraging the participation of local people and using their knowledge, enhanced consideration of and adaptation to future change, and supporting the development of systems thinking. Tracing exactly when and how these benefits arose was challenging, but two elements of the method seemed particularly useful. First, using a systematic approach to discuss how drivers of change may affect local social-ecological systems helped to foster systems thinking and identify connections between issues. Second, explicitly focusing on how to use and respond to scenarios helped identify specific practical activities, or "response options," that would support CBNRM despite the pressures of future change. Discussions about response options also highlighted the need for support by other actors, e.g., policy groups: this raised the question of when and how other actors and other sources of knowledge should be involved in scenario planning, so as to encourage their buy-in to actions identified by the process. We suggest that other CBNRM initiatives may benefit from adapting and applying scenario planning. However, these initiatives should be carefully monitored because further research is required to understand how and when scenario-planning methods may produce benefits, as well as their strengths and weaknesses versus other methods.

  6. Data for Participation and Participation as Data: Supporting Incremental Participatory Decision-Making in Urban Planning

    DEFF Research Database (Denmark)

    Ddamba, Joshua; Dittrich, Yvonne

    2015-01-01

    Current literature on urban planning explores how to use ICT to support citizen participation. Advances in open data and its possibility to easily represent data on maps, opens up new opportunities to support participation and decision making in urban projects. This article investigates how spatial...... process and the decisions that are part of it. The paper concludes with design implications for decision support for urban planning. In future research, the intention is to explore these implications in a Participatory Design process....... of an urban renewal project, the article investigates the use of structured and unstructured data for participation. The fieldwork is conducted using ethnographically inspired methods, based on participatory observations, interviews and document analysis. As a result, the incremental decisions, the resulting...

  7. A Quantitative Index to Support Recurrence Prevention Plans of Human-Related Events

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yochan; Park, Jinkyun; Jung, Wondea [KAERI, Daejeon (Korea, Republic of); Kim, Do Sam; Lee, Durk Hun [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2015-05-15

    In Korea, HuRAM+ (Human related event Root cause Analysis Method plus) was developed to scrutinize the causes of the human-related events. The information of the human-related events investigated by the HuRAM+ method has been also managed by a database management system, R-tracer. It is obvious that accumulating data of human error causes aims to support plans that reduce recurrences of similar events. However, in spite of the efforts for the development of the human error database, it was indicated that the database does not provide useful empirical basis for establishment of the recurrence prevention plans, because the framework to interpret the collected data and apply the insights from the data into the prevention plants has not been developed yet. In this paper, in order to support establishment of the recurrence prevention plans, a quantitative index, Human Error Repeat Interval (HERI), was proposed and its applications to human error prevention were introduced. In this paper, a quantitative index, the HERI was proposed and the statistics of HERIs were introduced. These estimations can be employed to evaluate effects of recurrence prevention plans to human errors. If a mean HERI score is low and the linear trend is not positive, it can be suspected that the recurrence prevention plans applied every human-related event has not been effectively propagated. For reducing repetitive error causes, the system design or operational culture can be reviewed. If there is a strong and negative trend, systematic investigation of the root causes behind these trends is required. Likewise, we expect that the HERI index will provide significant basis for establishing or adjusting prevention plans of human errors. The accurate estimation and application of HERI scores is expected to be done after accumulating more data. When a scatter plot of HERIs is fitted by two or more models, a statistical model selection method can be employed. Some criteria have been introduced by

  8. A Quantitative Index to Support Recurrence Prevention Plans of Human-Related Events

    International Nuclear Information System (INIS)

    Kim, Yochan; Park, Jinkyun; Jung, Wondea; Kim, Do Sam; Lee, Durk Hun

    2015-01-01

    In Korea, HuRAM+ (Human related event Root cause Analysis Method plus) was developed to scrutinize the causes of the human-related events. The information of the human-related events investigated by the HuRAM+ method has been also managed by a database management system, R-tracer. It is obvious that accumulating data of human error causes aims to support plans that reduce recurrences of similar events. However, in spite of the efforts for the development of the human error database, it was indicated that the database does not provide useful empirical basis for establishment of the recurrence prevention plans, because the framework to interpret the collected data and apply the insights from the data into the prevention plants has not been developed yet. In this paper, in order to support establishment of the recurrence prevention plans, a quantitative index, Human Error Repeat Interval (HERI), was proposed and its applications to human error prevention were introduced. In this paper, a quantitative index, the HERI was proposed and the statistics of HERIs were introduced. These estimations can be employed to evaluate effects of recurrence prevention plans to human errors. If a mean HERI score is low and the linear trend is not positive, it can be suspected that the recurrence prevention plans applied every human-related event has not been effectively propagated. For reducing repetitive error causes, the system design or operational culture can be reviewed. If there is a strong and negative trend, systematic investigation of the root causes behind these trends is required. Likewise, we expect that the HERI index will provide significant basis for establishing or adjusting prevention plans of human errors. The accurate estimation and application of HERI scores is expected to be done after accumulating more data. When a scatter plot of HERIs is fitted by two or more models, a statistical model selection method can be employed. Some criteria have been introduced by

  9. A methodology for Manufacturing Execution Systems (MES) implementation

    Science.gov (United States)

    Govindaraju, Rajesri; Putra, Krisna

    2016-02-01

    Manufacturing execution system is information systems (IS) application that bridges the gap between IS at the top level, namely enterprise resource planning (ERP), and IS at the lower levels, namely the automation systems. MES provides a media for optimizing the manufacturing process as a whole in a real time basis. By the use of MES in combination with the implementation of ERP and other automation systems, a manufacturing company is expected to have high competitiveness. In implementing MES, functional integration -making all the components of the manufacturing system able to work well together, is the most difficult challenge. For this, there has been an industry standard that specifies the sub-systems of a manufacturing execution systems and defines the boundaries between ERP systems, MES, and other automation systems. The standard is known as ISA-95. Although the advantages from the use of MES have been stated in some studies, not much research being done on how to implement MES effectively. The purpose of this study is to develop a methodology describing how MES implementation project should be managed, utilising the support of ISA- 95 reference model in the system development process. A proposed methodology was developed based on a general IS development methodology. The developed methodology were then revisited based on the understanding about the specific charateristics of MES implementation project found in an Indonesian steel manufacturing company implementation case. The case study highlighted the importance of applying an effective requirement elicitation method during innitial system assessment process, managing system interfaces and labor division in the design process, and performing a pilot deployment before putting the whole system into operation.

  10. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  11. Plans should abstractly describe intended behavior

    Energy Technology Data Exchange (ETDEWEB)

    Pfleger, K.; Hayes-Roth, B. [Stanford Univ., CA (United States)

    1996-12-31

    Planning is the process of formulating a potential course of action. How courses of action (plans) produced by a planning module are represented and how they are used by execution-oriented modules of a complex agent to influence or dictate behavior are critical architectural issues. In contrast to the traditional model of plans as executable programs that dictate precise behaviors, we claim that autonomous agents inhabiting dynamic, unpredictable environments can make better use of plans that only abstractly describe their intended behavior. Such plans only influence or constrain behavior, rather than dictating it. This idea has been discussed in a variety of contexts, but it is seldom incorporated into working complex agents. Experiments involving instantiations of our Adaptive Intelligent Systems architecture in a variety of domains have demonstrated the generality and usefulness of the approach, even with our currently simple plan representation and mechanisms for plan following. The behavioral benefits include (1) robust improvisation of goal-directed behavior in response to dynamic situations, (2) ready exploitation of dynamically acquired knowledge or behavioral capabilities, and (3) adaptation based on dynamic aspects of coordinating diverse behaviors to achieve multiple goals. In addition to these run-time advantages, the approach has useful implications for the design and configuration of agents. Indeed, the core ideas of the approach are natural extensions of fundamental ideas in software engineering.

  12. An Analysis of a Hard Real-Time Execution Environment Extension for FreeRTOS

    Directory of Open Access Journals (Sweden)

    STANGACIU, C.

    2015-08-01

    Full Text Available FreeRTOS is a popular real-time operating system, which has been under a significant attention in the last years due to its main advantages: it is open source, portable, well documented and implemented on more than 30 architectures. FreeRTOS execution environment is dynamic, preemptive and priority based, but it is not suitable for hard real-time tasks, because it provides task execution determinism only to a certain degree and cannot guarantee the absence of task execution jitter. As a solution to this problem, we propose a hard real time execution extension to FreeRTOS in order to support a particular model of HRT tasks, called ModXs, which are executed with no jitter. This article presents a detailed analysis, in terms of scheduling, task execution and memory usage of this hard real time execution environment extension. The article is concluding with the advantages this extension brings to the system compared to the small memory and timing overhead introduced.

  13. Informing the Structure of Executive Function in Children: A Meta-Analysis of Functional Neuroimaging Data

    Science.gov (United States)

    McKenna, Róisín; Rushe, T.; Woodcock, Kate A.

    2017-01-01

    The structure of executive function (EF) has been the focus of much debate for decades. What is more, the complexity and diversity provided by the developmental period only adds to this contention. The development of executive function plays an integral part in the expression of children's behavioral, cognitive, social, and emotional capabilities. Understanding how these processes are constructed during development allows for effective measurement of EF in this population. This meta-analysis aims to contribute to a better understanding of the structure of executive function in children. A coordinate-based meta-analysis was conducted (using BrainMap GingerALE 2.3), which incorporated studies administering functional magnetic resonance imaging (fMRI) during inhibition, switching, and working memory updating tasks in typical children (aged 6–18 years). The neural activation common across all executive tasks was compared to that shared by tasks pertaining only to inhibition, switching or updating, which are commonly considered to be fundamental executive processes. Results support the existence of partially separable but partially overlapping inhibition, switching, and updating executive processes at a neural level, in children over 6 years. Further, the shared neural activation across all tasks (associated with a proposed “unitary” component of executive function) overlapped to different degrees with the activation associated with each individual executive process. These findings provide evidence to support the suggestion that one of the most influential structural models of executive functioning in adults can also be applied to children of this age. However, the findings also call for careful consideration and measurement of both specific executive processes, and unitary executive function in this population. Furthermore, a need is highlighted for a new systematic developmental model, which captures the integrative nature of executive function in children. PMID

  14. Executive dysfunction is independently associated with reduced functional independence in heart failure.

    Science.gov (United States)

    Alosco, Michael L; Spitznagel, Mary Beth; Raz, Naftali; Cohen, Ronald; Sweet, Lawrence H; Colbert, Lisa H; Josephson, Richard; van Dulmen, Manfred; Hughes, Joel; Rosneck, Jim; Gunstad, John

    2014-03-01

    To examine the independent association between executive function with instrumental activities of daily living and health behaviours in older adults with heart failure. Executive function is an important contributor to functional independence as it consists of cognitive processes needed for decision-making, planning, organising and behavioural monitoring. Impairment in this domain is common in heart failure patients and associated with reduced performance of instrumental activities of daily living in many medical and neurological populations. However, the contribution of executive functions to functional independence and healthy lifestyle choices in heart failure patients has not been fully examined. Cross-sectional analyses. One hundred and seventy-five heart failure patients completed a neuropsychological battery and echocardiogram. Participants also completed the Lawton-Brody Instrumental Activities of Daily Living Scale and reported current cigarette use. Hierarchical regressions revealed that reduced executive function was independently associated with worse instrumental activity of daily living performance with a specific association for decreased ability to manage medications. Partial correlations showed that executive dysfunction was associated with current cigarette use. Our findings suggest that executive dysfunction is associated with poorer functional independence and contributes to unhealthy behaviours in heart failure. Future studies should examine whether heart failure patients benefit from formal organisation schema (i.e. pill organisers) to maintain independence. Screening of executive function in heart failure patients may provide key insight into their ability to perform daily tasks, including the management of treatment recommendations. © 2013 John Wiley & Sons Ltd.

  15. Bilingualism and age are continuous variables that influence executive function.

    Science.gov (United States)

    Incera, Sara; McLennan, Conor T

    2018-05-01

    We analyzed the effects of bilingualism and age on executive function. We examined these variables along a continuum, as opposed to dichotomizing them. We investigated the impact that bilingualism and age have on two measures of executive control (Stroop and Flanker). The mouse-tracking paradigm allowed us to examine the continuous dynamics of the responses as participants completed each trial. First, we found that the Stroop effect was reduced with younger age and higher levels of bilingualism; however, no Bilingualism by Age interaction emerged. Second, after controlling for baseline, the Flanker effect was not influenced by bilingualism or age. These results support the notion that bilingualism is one way of enhancing some aspects of executive function - specifically those related to the Stroop task - across the adult life span. In sum, different levels of bilingualism, and different ages, result in varying degrees of executive function as measured by the Stroop task.

  16. Executive functions in morality, religion, and paranormal beliefs.

    Science.gov (United States)

    Wain, Omar; Spinella, Marcello

    2007-01-01

    Moral, religious, and paranormal beliefs share some degree of overlap and play important roles in guiding peoples' behavior. Although partly cultural phenomena, they also have neurobiological components based on functional neuroimaging studies and research in clinical populations. Because all three show relationships to prefrontal system functioning, the current study examined whether they related to executive functions as measured by the Executive Function Inventory in a community sample. As in previous research, religious beliefs related positively to both moral attitudes and paranormal beliefs. Moral attitudes, however, did not relate to paranormal beliefs. Paranormal beliefs related inversely to impulse control and organization, whereas small positive correlations occurred between traditional religious beliefs, impulse control, and empathy. Moral attitudes, on the other hand, showed consistent positive correlations with all executive functions measured, independent of demographic influences. These findings concordantly support that prefrontal systems play a role in morality, religion, and paranormal beliefs.

  17. Assessment of Soil Protection to Support Forest Planning: an Experience in Southern Italy

    Directory of Open Access Journals (Sweden)

    Fabrizio Ferretti

    2014-04-01

    Full Text Available Aim of study: to support landscape planning when soil-erosion control and water cycle regulation represent relevant issues for forest management. A methodological approach - based on simplified index – is proposed in order to assess the protective efficacy of forests on soils (indirect protection. This method is aimed at supporting technicians who are requested to define the most suitable management guidelines and silvicultural treatments.Area of study: Southern Apennines (Alto Agri district – Basilicata Region - Italy, where a landscape planning experimentation was implemented. Material and Methods: The data to estimate the parameters used for the simplified index calculation are retrieved from a non aligned systematic forest inventory. The method considers: 1 the tendency towards instability, 2 the protective action of forest cover and 3 different silvicultural options.Main results: For the analysed forest categories, the results indicate the situations in which hydrogeological hazard is high. The cross-reading of these data with the values based on years of partial and total uncovering of the ground according to different silvicultural options (for each forest category in the reference period of 100 years has supported the definition of silviculture treatments and management options suitable for the considered forest formations.Research highlights: The proposed method can effectively support technicians in the field by highlighting situations of major hazard risk. Thanks to the joined assessment of different silvicultural options for each forest category, a series of silvicultural treatments, capable of better protecting the soil, can be already defined in the field survey phase.Key words: Alto Agri district (Italy; Forest Landscape Management Planning (FLMP; management; silvicultural treatment; protective function and soil erosion.

  18. Assessment of Soil Protection to Support Forest Planning: an Experience in Southern Italy

    Energy Technology Data Exchange (ETDEWEB)

    Ferreti, F.; Cantiani, P.; Meo, I. de; Paletto, A.

    2014-06-01

    Aim of study: To support landscape planning when soil-erosion control and water cycle regulation represent relevant issues for forest management. A methodological approach -based on simplified index- is proposed in order to assess the protective efficacy of forests on soils (indirect protection). This method is aimed at supporting technicians who are requested to define the most suitable management guidelines and silviculture treatments. Area of study: Southern Apennines (Alto Agri district -Basilicata Region- Italy), where a landscape planning experimentation was implemented. Material and methods: The data to estimate the parameters used for the simplified index calculation are retrieved from a non aligned systematic forest inventory. The method considers: 1) the tendency towards instability, 2) the protective action of forest cover and 3) different silviculture options. Main results: For the analysed forest categories, the results indicate the situations in which hydrogeological hazard is high. The cross-reading of these data with the values based on years of partial and total uncovering of the ground according to different silviculture options (for each forest category in the reference period of 100 years) has supported the definition of silviculture treatments and management options suitable for the considered forest formations. Research highlights The proposed method can effectively support technicians in the field by highlighting situations of major hazard risk. Thanks to the joined assessment of different silviculture options for each forest category, a series of silviculture treatments, capable of better protecting the soil, can be already defined in the field survey phase. Key words: Alto Agri district (Italy); Forest Landscape Management Planning (FLMP); management; silviculture treatment; protective function e soil erosion. (Author)

  19. Executive Dysfunction among Children with Reading Comprehension Deficits

    Science.gov (United States)

    Locascio, Gianna; Mahone, E. Mark; Eason, Sarah H.; Cutting, Laurie E.

    2010-01-01

    Emerging research supports the contribution of executive function (EF) to reading comprehension; however, a unique pattern has not been established for children who demonstrate comprehension difficulties despite average word recognition ability (specific reading comprehension deficit; S-RCD). To identify particular EF components on which children…

  20. Plan for radiological emergencies situations

    International Nuclear Information System (INIS)

    Estrada Figueroa, E.R.

    1998-01-01

    The objective for the Emergencies plan it is to reestablish the stock that they should be executed by the regulatory Entity in Guatemala during a real potential radiological emergency situation in the national territory